SPO 1997 04 01 00 00 30 7.8 -9 670.20 -58.2 -57.5 -58.2 -99 0 SPO 1997 04 01 00 01 29 7.8 -9 670.20 -58.2 -57.6 -58.2 -99 -99 SPO 1997 04 01 00 02 29 7.7 -9 670.20 -58.1 -57.5 -58.2 -99 -99 SPO 1997 04 01 00 03 29 7.9 -9 670.20 -58.1 -57.5 -58.2 -99 -99 SPO 1997 04 01 00 04 29 7.8 -9 670.20 -58.1 -57.5 -58.2 -99 -99 SPO 1997 04 01 00 05 28 7.9 -9 670.20 -58.1 -57.5 -58.1 -99 -99 SPO 1997 04 01 00 06 29 7.8 -9 670.20 -58.1 -57.5 -58.1 -99 -99 SPO 1997 04 01 00 07 28 7.7 -9 670.20 -58.0 -57.5 -58.1 -99 -99 SPO 1997 04 01 00 08 28 8.0 -9 670.20 -58.0 -57.5 -58.1 -99 -99 SPO 1997 04 01 00 09 28 8.1 -9 670.20 -58.0 -57.5 -58.1 -99 -99 SPO 1997 04 01 00 10 28 7.7 -9 670.10 -58.0 -57.6 -58.0 -99 -99 SPO 1997 04 01 00 11 28 7.7 -9 670.20 -58.0 -57.5 -58.1 -99 -99 SPO 1997 04 01 00 12 28 7.6 -9 670.20 -58.0 -57.6 -58.1 -99 -99 SPO 1997 04 01 00 13 28 7.5 -9 670.20 -58.0 -57.6 -58.1 61 -99 SPO 1997 04 01 00 14 27 7.8 -9 670.20 -58.0 -57.5 -58.0 61 -99 SPO 1997 04 01 00 15 27 7.3 -9 670.30 -57.9 -57.5 -58.0 61 -99 SPO 1997 04 01 00 16 27 7.3 -9 670.30 -57.9 -57.5 -58.0 62 -99 SPO 1997 04 01 00 17 28 7.2 -9 670.30 -57.9 -57.5 -58.0 62 -99 SPO 1997 04 01 00 18 28 6.8 -9 670.40 -57.9 -57.5 -58.0 62 -99 SPO 1997 04 01 00 19 29 6.9 -9 670.40 -57.9 -57.5 -57.9 62 -99 SPO 1997 04 01 00 20 29 6.9 -9 670.40 -57.9 -57.5 -58.0 61 -99 SPO 1997 04 01 00 21 30 7.0 -9 670.40 -57.9 -57.5 -58.0 60 -99 SPO 1997 04 01 00 22 30 6.8 -9 670.40 -57.9 -57.6 -58.0 60 -99 SPO 1997 04 01 00 23 30 6.7 -9 670.40 -57.9 -57.7 -58.0 59 -99 SPO 1997 04 01 00 24 30 6.6 -9 670.40 -58.0 -57.7 -58.0 60 -99 SPO 1997 04 01 00 25 30 6.9 -9 670.40 -58.0 -57.7 -58.0 61 -99 SPO 1997 04 01 00 26 29 6.6 -9 670.40 -57.9 -57.7 -58.1 60 -99 SPO 1997 04 01 00 27 29 6.5 -9 670.40 -57.9 -57.7 -58.0 59 -99 SPO 1997 04 01 00 28 31 6.4 -9 670.40 -58.0 -57.7 -58.0 60 -99 SPO 1997 04 01 00 29 30 6.5 -9 670.40 -58.0 -57.7 -58.0 60 -99 SPO 1997 04 01 00 30 29 6.5 -9 670.40 -57.9 -57.7 -58.0 60 -99 SPO 1997 04 01 00 31 30 6.3 -9 670.50 -57.9 -57.7 -58.0 60 -99 SPO 1997 04 01 00 32 31 6.2 -9 670.50 -58.0 -57.7 -58.0 60 -99 SPO 1997 04 01 00 33 31 6.0 -9 670.50 -58.0 -57.7 -58.1 60 -99 SPO 1997 04 01 00 34 32 6.0 -9 670.60 -58.0 -57.7 -58.1 59 -99 SPO 1997 04 01 00 35 33 5.9 -9 670.60 -58.0 -57.7 -58.0 59 -99 SPO 1997 04 01 00 36 34 5.7 -9 670.60 -58.0 -57.7 -58.1 59 -99 SPO 1997 04 01 00 37 33 5.8 -9 670.60 -58.0 -57.7 -58.1 59 -99 SPO 1997 04 01 00 38 34 5.7 -9 670.60 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 01 00 39 34 5.5 -9 670.60 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 01 00 40 34 5.7 -9 670.60 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 41 33 5.6 -9 670.60 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 42 33 5.7 -9 670.60 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 43 34 6.0 -9 670.60 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 44 33 5.7 -9 670.60 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 45 34 5.8 -9 670.60 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 01 00 46 34 5.8 -9 670.60 -58.0 -57.8 -58.2 59 -99 SPO 1997 04 01 00 47 34 5.8 -9 670.60 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 01 00 48 34 5.8 -9 670.60 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 01 00 49 34 5.7 -9 670.60 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 50 33 5.7 -9 670.60 -58.0 -57.7 -58.1 61 -99 SPO 1997 04 01 00 51 32 6.1 -9 670.60 -58.0 -57.7 -58.1 61 -99 SPO 1997 04 01 00 52 31 6.2 -9 670.50 -58.0 -57.7 -58.1 61 -99 SPO 1997 04 01 00 53 31 6.1 -9 670.50 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 54 30 6.6 -9 670.50 -58.0 -57.8 -58.1 61 -99 SPO 1997 04 01 00 55 30 6.6 -9 670.50 -58.0 -57.8 -58.1 60 -99 SPO 1997 04 01 00 56 30 6.8 -9 670.40 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 01 00 57 31 6.6 -9 670.50 -58.0 -57.8 -58.1 59 -99 SPO 1997 04 01 00 58 31 6.5 -9 670.50 -58.1 -57.8 -58.1 60 -99 SPO 1997 04 01 00 59 31 6.7 -9 670.50 -58.1 -57.8 -58.2 59 -99 SPO 1997 04 01 01 00 32 6.3 -9 670.50 -58.1 -57.8 -58.2 60 0 SPO 1997 04 01 01 01 33 6.1 -9 670.50 -58.1 -57.8 -58.2 61 -99 SPO 1997 04 01 01 02 33 6.3 -9 670.50 -58.1 -57.8 -58.2 61 -99 SPO 1997 04 01 01 03 33 6.4 -9 670.50 -58.1 -57.8 -58.2 61 -99 SPO 1997 04 01 01 04 33 6.5 -9 670.50 -58.2 -57.8 -58.2 62 -99 SPO 1997 04 01 01 05 33 6.5 -9 670.40 -58.2 -57.8 -58.3 62 -99 SPO 1997 04 01 01 06 31 6.6 -9 670.40 -58.1 -57.8 -58.2 61 -99 SPO 1997 04 01 01 07 32 6.5 -9 670.40 -58.2 -57.8 -58.3 61 -99 SPO 1997 04 01 01 08 31 6.3 -9 670.50 -58.2 -57.8 -58.3 61 -99 SPO 1997 04 01 01 09 32 6.2 -9 670.50 -58.2 -57.8 -58.3 60 -99 SPO 1997 04 01 01 10 32 6.0 -9 670.60 -58.2 -57.9 -58.3 60 -99 SPO 1997 04 01 01 11 33 5.9 -9 670.50 -58.2 -57.9 -58.3 60 -99 SPO 1997 04 01 01 12 33 5.9 -9 670.50 -58.3 -58.0 -58.3 61 -99 SPO 1997 04 01 01 13 33 6.1 -9 670.50 -58.3 -58.0 -58.3 62 -99 SPO 1997 04 01 01 14 34 6.4 -9 670.50 -58.3 -57.9 -58.3 62 -99 SPO 1997 04 01 01 15 34 6.0 -9 670.50 -58.3 -57.9 -58.4 62 -99 SPO 1997 04 01 01 16 34 6.2 -9 670.50 -58.3 -57.9 -58.4 62 -99 SPO 1997 04 01 01 17 34 6.2 -9 670.50 -58.3 -58.0 -58.3 62 -99 SPO 1997 04 01 01 18 35 6.2 -9 670.50 -58.3 -57.9 -58.4 62 -99 SPO 1997 04 01 01 19 35 6.1 -9 670.50 -58.3 -57.9 -58.4 61 -99 SPO 1997 04 01 01 20 36 6.0 -9 670.50 -58.3 -57.9 -58.4 61 -99 SPO 1997 04 01 01 21 36 5.9 -9 670.60 -58.3 -58.0 -58.4 60 -99 SPO 1997 04 01 01 22 38 5.6 -9 670.60 -58.3 -58.0 -58.4 60 -99 SPO 1997 04 01 01 23 38 5.5 -9 670.60 -58.3 -58.0 -58.4 60 -99 SPO 1997 04 01 01 24 39 5.5 -9 670.70 -58.4 -58.0 -58.4 60 -99 SPO 1997 04 01 01 25 39 5.5 -9 670.70 -58.4 -58.0 -58.5 61 -99 SPO 1997 04 01 01 26 38 5.3 -9 670.70 -58.4 -58.1 -58.5 61 -99 SPO 1997 04 01 01 27 38 5.3 -9 670.70 -58.4 -58.1 -58.5 62 -99 SPO 1997 04 01 01 28 38 5.4 -9 670.70 -58.4 -58.1 -58.5 62 -99 SPO 1997 04 01 01 29 36 5.6 -9 670.60 -58.5 -58.1 -58.5 62 -99 SPO 1997 04 01 01 30 36 5.6 -9 670.60 -58.5 -58.1 -58.5 62 -99 SPO 1997 04 01 01 31 36 5.9 -9 670.60 -58.5 -58.1 -58.5 62 -99 SPO 1997 04 01 01 32 35 6.2 -9 670.60 -58.5 -58.0 -58.5 62 -99 SPO 1997 04 01 01 33 35 6.1 -9 670.50 -58.5 -58.1 -58.5 61 -99 SPO 1997 04 01 01 34 36 6.2 -9 670.50 -58.5 -58.1 -58.6 61 -99 SPO 1997 04 01 01 35 35 6.2 -9 670.60 -58.5 -58.1 -58.6 61 -99 SPO 1997 04 01 01 36 36 6.5 -9 670.60 -58.5 -58.1 -58.6 61 -99 SPO 1997 04 01 01 37 36 6.3 -9 670.50 -58.5 -58.0 -58.6 61 -99 SPO 1997 04 01 01 38 37 6.0 -9 670.60 -58.5 -58.0 -58.6 61 -99 SPO 1997 04 01 01 39 39 5.8 -9 670.60 -58.6 -58.1 -58.7 61 -99 SPO 1997 04 01 01 40 40 5.5 -9 670.60 -58.6 -58.1 -58.7 60 -99 SPO 1997 04 01 01 41 39 5.6 -9 670.60 -58.7 -58.2 -58.8 60 -99 SPO 1997 04 01 01 42 38 5.5 -9 670.60 -58.7 -58.2 -58.8 61 -99 SPO 1997 04 01 01 43 38 5.9 -9 670.60 -58.7 -58.2 -58.8 60 -99 SPO 1997 04 01 01 44 39 5.7 -9 670.60 -58.8 -58.2 -58.8 61 -99 SPO 1997 04 01 01 45 40 6.0 -9 670.60 -58.8 -58.3 -58.9 61 -99 SPO 1997 04 01 01 46 40 6.0 -9 670.50 -58.9 -58.3 -58.9 61 -99 SPO 1997 04 01 01 47 40 6.0 -9 670.50 -58.9 -58.4 -59.0 61 -99 SPO 1997 04 01 01 48 39 5.9 -9 670.50 -59.0 -58.4 -59.1 62 -99 SPO 1997 04 01 01 49 40 5.8 -9 670.50 -59.0 -58.4 -59.1 61 -99 SPO 1997 04 01 01 50 41 5.7 -9 670.50 -59.0 -58.4 -59.1 61 -99 SPO 1997 04 01 01 51 41 5.7 -9 670.60 -59.1 -58.4 -59.2 61 -99 SPO 1997 04 01 01 52 42 5.8 -9 670.60 -59.2 -58.4 -59.2 61 -99 SPO 1997 04 01 01 53 42 5.6 -9 670.50 -59.2 -58.4 -59.3 59 -99 SPO 1997 04 01 01 54 44 5.5 -9 670.50 -59.2 -58.4 -59.3 59 -99 SPO 1997 04 01 01 55 45 5.6 -9 670.50 -59.3 -58.5 -59.4 59 -99 SPO 1997 04 01 01 56 46 5.8 -9 670.60 -59.4 -58.5 -59.4 59 -99 SPO 1997 04 01 01 57 45 5.6 -9 670.50 -59.4 -58.6 -59.5 58 -99 SPO 1997 04 01 01 58 47 5.6 -9 670.60 -59.4 -58.6 -59.5 59 -99 SPO 1997 04 01 01 59 48 5.4 -9 670.50 -59.6 -58.7 -59.6 60 -99 SPO 1997 04 01 02 00 47 5.5 -9 670.60 -59.6 -58.7 -59.7 60 0 SPO 1997 04 01 02 01 45 5.7 -9 670.60 -59.7 -58.7 -59.7 60 -99 SPO 1997 04 01 02 02 47 5.5 -9 670.60 -59.7 -58.7 -59.7 60 -99 SPO 1997 04 01 02 03 47 5.4 -9 670.60 -59.7 -58.7 -59.8 60 -99 SPO 1997 04 01 02 04 47 5.4 -9 670.60 -59.8 -58.8 -59.8 60 -99 SPO 1997 04 01 02 05 48 5.0 -9 670.60 -59.8 -58.8 -59.8 59 -99 SPO 1997 04 01 02 06 47 5.0 -9 670.60 -59.8 -58.8 -59.9 59 -99 SPO 1997 04 01 02 07 49 5.2 -9 670.60 -59.9 -58.8 -59.9 60 -99 SPO 1997 04 01 02 08 48 5.2 -9 670.60 -60.0 -58.8 -60.0 60 -99 SPO 1997 04 01 02 09 47 5.2 -9 670.60 -60.0 -58.8 -60.1 60 -99 SPO 1997 04 01 02 10 48 5.2 -9 670.60 -60.1 -58.8 -60.1 60 -99 SPO 1997 04 01 02 11 47 5.2 -9 670.60 -60.1 -58.9 -60.1 60 -99 SPO 1997 04 01 02 12 46 5.1 -9 670.60 -60.1 -58.9 -60.1 59 -99 SPO 1997 04 01 02 13 45 5.2 -9 670.60 -60.1 -59.0 -60.1 59 -99 SPO 1997 04 01 02 14 45 5.1 -9 670.60 -60.1 -59.0 -60.1 60 -99 SPO 1997 04 01 02 15 46 5.0 -9 670.60 -60.1 -59.0 -60.0 60 -99 SPO 1997 04 01 02 16 47 5.0 -9 670.60 -60.1 -59.0 -60.1 60 -99 SPO 1997 04 01 02 17 48 5.1 -9 670.60 -60.1 -59.0 -60.1 60 -99 SPO 1997 04 01 02 18 48 5.2 -9 670.50 -60.1 -59.0 -60.2 60 -99 SPO 1997 04 01 02 19 47 5.3 -9 670.60 -60.1 -59.0 -60.2 60 -99 SPO 1997 04 01 02 20 47 5.2 -9 670.50 -60.2 -59.0 -60.2 60 -99 SPO 1997 04 01 02 21 45 5.3 -9 670.50 -60.2 -59.0 -60.3 60 -99 SPO 1997 04 01 02 22 46 5.1 -9 670.60 -60.2 -59.0 -60.3 60 -99 SPO 1997 04 01 02 23 45 5.1 -9 670.50 -60.2 -59.0 -60.2 60 -99 SPO 1997 04 01 02 24 46 5.2 -9 670.60 -60.2 -59.0 -60.2 60 -99 SPO 1997 04 01 02 25 47 5.2 -9 670.60 -60.2 -58.9 -60.2 60 -99 SPO 1997 04 01 02 26 49 5.1 -9 670.60 -60.2 -58.9 -60.3 60 -99 SPO 1997 04 01 02 27 51 5.0 -9 670.60 -60.2 -59.0 -60.3 59 -99 SPO 1997 04 01 02 28 52 5.0 -9 670.60 -60.2 -59.0 -60.4 59 -99 SPO 1997 04 01 02 29 53 4.7 -9 670.60 -60.3 -59.2 -60.4 59 -99 SPO 1997 04 01 02 30 52 5.0 -9 670.60 -60.3 -59.2 -60.4 59 -99 SPO 1997 04 01 02 31 52 5.0 -9 670.60 -60.4 -59.2 -60.4 60 -99 SPO 1997 04 01 02 32 50 5.2 -9 670.60 -60.4 -59.2 -60.4 60 -99 SPO 1997 04 01 02 33 48 5.4 -9 670.60 -60.4 -59.2 -60.4 61 -99 SPO 1997 04 01 02 34 47 5.7 -9 670.50 -60.4 -59.1 -60.4 61 -99 SPO 1997 04 01 02 35 47 5.8 -9 670.50 -60.3 -59.1 -60.4 61 -99 SPO 1997 04 01 02 36 48 5.9 -9 670.50 -60.3 -59.0 -60.3 61 -99 SPO 1997 04 01 02 37 49 5.7 -9 670.60 -60.3 -59.0 -60.4 61 -99 SPO 1997 04 01 02 38 51 5.4 -9 670.60 -60.4 -59.1 -60.5 60 -99 SPO 1997 04 01 02 39 53 5.1 -9 670.60 -60.5 -59.2 -60.6 59 -99 SPO 1997 04 01 02 40 55 5.0 -9 670.60 -60.5 -59.2 -60.6 59 -99 SPO 1997 04 01 02 41 58 4.7 -9 670.70 -60.6 -59.2 -60.6 59 -99 SPO 1997 04 01 02 42 60 4.5 -9 670.70 -60.6 -59.3 -60.7 59 -99 SPO 1997 04 01 02 43 61 4.5 -9 670.70 -60.7 -59.4 -60.7 59 -99 SPO 1997 04 01 02 44 60 4.7 -9 670.70 -60.7 -59.4 -60.8 59 -99 SPO 1997 04 01 02 45 58 4.9 -9 670.60 -60.8 -59.5 -60.8 59 -99 SPO 1997 04 01 02 46 56 5.2 -9 670.60 -60.8 -59.5 -60.9 59 -99 SPO 1997 04 01 02 47 56 5.3 -9 670.60 -60.9 -59.4 -60.9 60 -99 SPO 1997 04 01 02 48 56 5.1 -9 670.60 -61.0 -59.4 -61.0 61 -99 SPO 1997 04 01 02 49 58 5.1 -9 670.60 -61.0 -59.4 -61.0 60 -99 SPO 1997 04 01 02 50 59 5.0 -9 670.70 -61.0 -59.4 -61.0 60 -99 SPO 1997 04 01 02 51 61 4.7 -9 670.70 -61.0 -59.4 -61.0 59 -99 SPO 1997 04 01 02 52 61 4.6 -9 670.70 -61.1 -59.4 -61.1 59 -99 SPO 1997 04 01 02 53 60 4.8 -9 670.70 -61.1 -59.5 -61.1 59 -99 SPO 1997 04 01 02 54 59 5.0 -9 670.70 -61.2 -59.5 -61.2 60 -99 SPO 1997 04 01 02 55 58 5.2 -9 670.60 -61.2 -59.4 -61.2 60 -99 SPO 1997 04 01 02 56 57 5.2 -9 670.60 -61.3 -59.4 -61.3 60 -99 SPO 1997 04 01 02 57 56 5.3 -9 670.60 -61.2 -59.5 -61.3 59 -99 SPO 1997 04 01 02 58 55 5.4 -9 670.60 -61.3 -59.5 -61.4 59 -99 SPO 1997 04 01 02 59 54 5.4 -9 670.60 -61.3 -59.5 -61.4 59 -99 SPO 1997 04 01 03 00 54 5.5 -9 670.60 -61.4 -59.5 -61.4 59 0 SPO 1997 04 01 03 01 54 5.4 -9 670.50 -61.4 -59.6 -61.4 59 -99 SPO 1997 04 01 03 02 55 5.7 -9 670.60 -61.4 -59.5 -61.5 58 -99 SPO 1997 04 01 03 03 53 5.6 -9 670.60 -61.5 -59.4 -61.5 59 -99 SPO 1997 04 01 03 04 52 5.4 -9 670.60 -61.5 -59.5 -61.5 59 -99 SPO 1997 04 01 03 05 54 5.4 -9 670.60 -61.5 -59.5 -61.5 58 -99 SPO 1997 04 01 03 06 56 5.2 -9 670.60 -61.5 -59.5 -61.5 59 -99 SPO 1997 04 01 03 07 56 5.0 -9 670.70 -61.5 -59.5 -61.5 59 -99 SPO 1997 04 01 03 08 57 4.6 -9 670.70 -61.5 -59.5 -61.5 59 -99 SPO 1997 04 01 03 09 57 4.5 -9 670.70 -61.5 -59.7 -61.5 59 -99 SPO 1997 04 01 03 10 60 4.6 -9 670.70 -61.5 -59.7 -61.5 60 -99 SPO 1997 04 01 03 11 58 4.6 -9 670.80 -61.5 -59.8 -61.6 59 -99 SPO 1997 04 01 03 12 59 4.7 -9 670.80 -61.5 -59.7 -61.6 59 -99 SPO 1997 04 01 03 13 58 4.8 -9 670.70 -61.5 -59.7 -61.6 58 -99 SPO 1997 04 01 03 14 56 5.0 -9 670.80 -61.6 -59.6 -61.6 58 -99 SPO 1997 04 01 03 15 55 5.1 -9 670.70 -61.6 -59.6 -61.6 58 -99 SPO 1997 04 01 03 16 52 5.2 -9 670.70 -61.6 -59.7 -61.7 58 -99 SPO 1997 04 01 03 17 50 5.3 -9 670.70 -61.6 -59.6 -61.7 58 -99 SPO 1997 04 01 03 18 49 5.6 -9 670.70 -61.7 -59.6 -61.7 59 -99 SPO 1997 04 01 03 19 47 5.6 -9 670.60 -61.7 -59.5 -61.7 59 -99 SPO 1997 04 01 03 20 47 5.6 -9 670.60 -61.7 -59.4 -61.7 60 -99 SPO 1997 04 01 03 21 47 5.6 -9 670.70 -61.7 -59.4 -61.7 60 -99 SPO 1997 04 01 03 22 48 5.5 -9 670.70 -61.6 -59.4 -61.7 60 -99 SPO 1997 04 01 03 23 47 5.5 -9 670.70 -61.6 -59.5 -61.7 59 -99 SPO 1997 04 01 03 24 47 5.6 -9 670.70 -61.6 -59.4 -61.7 59 -99 SPO 1997 04 01 03 25 48 5.7 -9 670.70 -61.6 -59.3 -61.6 59 -99 SPO 1997 04 01 03 26 48 5.7 -9 670.60 -61.6 -59.3 -61.7 59 -99 SPO 1997 04 01 03 27 48 5.7 -9 670.60 -61.5 -59.3 -61.7 58 -99 SPO 1997 04 01 03 28 48 5.7 -9 670.60 -61.6 -59.3 -61.6 59 -99 SPO 1997 04 01 03 29 48 5.7 -9 670.60 -61.6 -59.2 -61.7 58 -99 SPO 1997 04 01 03 30 48 5.6 -9 670.60 -61.6 -59.2 -61.7 59 -99 SPO 1997 04 01 03 31 48 5.6 -9 670.70 -61.6 -59.3 -61.6 59 -99 SPO 1997 04 01 03 32 47 5.8 -9 670.70 -61.6 -59.3 -61.6 59 -99 SPO 1997 04 01 03 33 48 5.6 -9 670.60 -61.5 -59.3 -61.6 59 -99 SPO 1997 04 01 03 34 47 5.7 -9 670.60 -61.5 -59.3 -61.6 59 -99 SPO 1997 04 01 03 35 47 5.7 -9 670.60 -61.5 -59.3 -61.6 59 -99 SPO 1997 04 01 03 36 46 5.7 -9 670.60 -61.5 -59.3 -61.6 59 -99 SPO 1997 04 01 03 37 46 5.6 -9 670.60 -61.5 -59.3 -61.6 59 -99 SPO 1997 04 01 03 38 45 5.7 -9 670.60 -61.5 -59.2 -61.6 59 -99 SPO 1997 04 01 03 39 44 5.8 -9 670.60 -61.5 -59.2 -61.5 59 -99 SPO 1997 04 01 03 40 44 5.9 -9 670.60 -61.4 -59.2 -61.5 58 -99 SPO 1997 04 01 03 41 43 6.1 -9 670.60 -61.4 -59.1 -61.5 59 -99 SPO 1997 04 01 03 42 44 6.2 -9 670.60 -61.4 -59.1 -61.5 60 -99 SPO 1997 04 01 03 43 45 6.2 -9 670.60 -61.3 -59.1 -61.4 59 -99 SPO 1997 04 01 03 44 45 5.9 -9 670.60 -61.3 -59.1 -61.4 59 -99 SPO 1997 04 01 03 45 46 5.8 -9 670.60 -61.3 -59.2 -61.4 59 -99 SPO 1997 04 01 03 46 47 5.6 -9 670.60 -61.3 -59.3 -61.4 59 -99 SPO 1997 04 01 03 47 46 5.5 -9 670.60 -61.3 -59.4 -61.4 59 -99 SPO 1997 04 01 03 48 45 5.6 -9 670.60 -61.3 -59.4 -61.4 59 -99 SPO 1997 04 01 03 49 46 5.7 -9 670.60 -61.3 -59.4 -61.4 59 -99 SPO 1997 04 01 03 50 46 5.7 -9 670.60 -61.3 -59.4 -61.4 59 -99 SPO 1997 04 01 03 51 46 5.6 -9 670.60 -61.2 -59.4 -61.3 59 -99 SPO 1997 04 01 03 52 47 5.6 -9 670.70 -61.2 -59.4 -61.3 59 -99 SPO 1997 04 01 03 53 48 5.2 -9 670.70 -61.2 -59.5 -61.3 59 -99 SPO 1997 04 01 03 54 48 5.3 -9 670.70 -61.1 -59.5 -61.3 59 -99 SPO 1997 04 01 03 55 48 5.2 -9 670.80 -61.1 -59.5 -61.2 59 -99 SPO 1997 04 01 03 56 48 5.3 -9 670.80 -61.1 -59.5 -61.2 60 -99 SPO 1997 04 01 03 57 47 5.4 -9 670.80 -61.1 -59.5 -61.2 60 -99 SPO 1997 04 01 03 58 47 5.4 -9 670.80 -61.1 -59.5 -61.2 60 -99 SPO 1997 04 01 03 59 46 5.2 -9 670.80 -61.0 -59.5 -61.2 59 -99 SPO 1997 04 01 04 00 47 5.2 -9 670.80 -61.0 -59.4 -61.2 59 0 SPO 1997 04 01 04 01 48 5.1 -9 670.80 -61.0 -59.4 -61.2 59 -99 SPO 1997 04 01 04 02 48 5.0 -9 670.80 -61.0 -59.5 -61.2 59 -99 SPO 1997 04 01 04 03 49 5.0 -9 670.80 -61.0 -59.5 -61.1 59 -99 SPO 1997 04 01 04 04 48 5.4 -9 670.80 -61.0 -59.5 -61.2 60 -99 SPO 1997 04 01 04 05 46 5.6 -9 670.70 -61.0 -59.5 -61.2 60 -99 SPO 1997 04 01 04 06 45 5.9 -9 670.70 -61.0 -59.4 -61.1 60 -99 SPO 1997 04 01 04 07 44 6.0 -9 670.60 -61.0 -59.4 -61.1 60 -99 SPO 1997 04 01 04 08 43 6.2 -9 670.60 -60.9 -59.4 -61.0 59 -99 SPO 1997 04 01 04 09 43 6.3 -9 670.60 -60.9 -59.3 -61.0 59 -99 SPO 1997 04 01 04 10 43 6.4 -9 670.60 -60.9 -59.3 -61.0 59 -99 SPO 1997 04 01 04 11 43 6.5 -9 670.60 -60.8 -59.2 -60.9 59 -99 SPO 1997 04 01 04 12 43 6.5 -9 670.60 -60.8 -59.2 -60.9 59 -99 SPO 1997 04 01 04 13 42 6.6 -9 670.60 -60.8 -59.2 -60.9 59 -99 SPO 1997 04 01 04 14 42 6.7 -9 670.60 -60.8 -59.2 -60.9 59 -99 SPO 1997 04 01 04 15 41 6.7 -9 670.60 -60.8 -59.1 -60.9 59 -99 SPO 1997 04 01 04 16 40 6.8 -9 670.60 -60.8 -59.2 -60.9 60 -99 SPO 1997 04 01 04 17 39 7.0 -9 670.60 -60.8 -59.2 -60.8 60 -99 SPO 1997 04 01 04 18 39 7.1 -9 670.50 -60.7 -59.2 -60.8 61 -99 SPO 1997 04 01 04 19 40 6.9 -9 670.60 -60.7 -59.0 -60.8 61 -99 SPO 1997 04 01 04 20 39 7.0 -9 670.60 -60.6 -59.1 -60.7 60 -99 SPO 1997 04 01 04 21 40 6.9 -9 670.60 -60.6 -59.0 -60.7 60 -99 SPO 1997 04 01 04 22 39 7.0 -9 670.60 -60.6 -59.1 -60.7 60 -99 SPO 1997 04 01 04 23 39 7.0 -9 670.50 -60.6 -59.1 -60.7 60 -99 SPO 1997 04 01 04 24 39 7.1 -9 670.50 -60.6 -59.1 -60.7 60 -99 SPO 1997 04 01 04 25 39 7.1 -9 670.50 -60.5 -59.1 -60.6 59 -99 SPO 1997 04 01 04 26 40 7.3 -9 670.40 -60.5 -59.1 -60.6 60 -99 SPO 1997 04 01 04 27 40 7.3 -9 670.40 -60.5 -59.1 -60.6 61 -99 SPO 1997 04 01 04 28 40 7.3 -9 670.40 -60.5 -59.1 -60.6 61 -99 SPO 1997 04 01 04 29 40 7.3 -9 670.40 -60.5 -59.1 -60.6 61 -99 SPO 1997 04 01 04 30 41 7.3 -9 670.40 -60.4 -59.0 -60.5 60 -99 SPO 1997 04 01 04 31 41 7.1 -9 670.40 -60.4 -59.1 -60.5 60 -99 SPO 1997 04 01 04 32 41 7.3 -9 670.40 -60.4 -59.2 -60.5 60 -99 SPO 1997 04 01 04 33 41 7.1 -9 670.40 -60.4 -59.2 -60.4 60 -99 SPO 1997 04 01 04 34 41 7.1 -9 670.50 -60.4 -59.2 -60.4 60 -99 SPO 1997 04 01 04 35 41 7.0 -9 670.50 -60.3 -59.2 -60.4 60 -99 SPO 1997 04 01 04 36 41 7.1 -9 670.40 -60.3 -59.2 -60.4 60 -99 SPO 1997 04 01 04 37 41 6.9 -9 670.50 -60.3 -59.2 -60.4 61 -99 SPO 1997 04 01 04 38 43 6.9 -9 670.50 -60.3 -59.2 -60.3 62 -99 SPO 1997 04 01 04 39 43 6.7 -9 670.50 -60.2 -59.2 -60.3 61 -99 SPO 1997 04 01 04 40 42 6.3 -9 670.50 -60.2 -59.2 -60.3 61 -99 SPO 1997 04 01 04 41 43 6.2 -9 670.60 -60.2 -59.2 -60.3 62 -99 SPO 1997 04 01 04 42 42 5.9 -9 670.60 -60.1 -59.3 -60.3 61 -99 SPO 1997 04 01 04 43 43 5.6 -9 670.60 -60.1 -59.3 -60.2 61 -99 SPO 1997 04 01 04 44 44 5.7 -9 670.60 -60.1 -59.3 -60.2 61 -99 SPO 1997 04 01 04 45 45 5.6 -9 670.70 -60.1 -59.3 -60.2 61 -99 SPO 1997 04 01 04 46 45 5.6 -9 670.70 -60.0 -59.3 -60.1 60 -99 SPO 1997 04 01 04 47 45 5.9 -9 670.60 -60.0 -59.4 -60.1 60 -99 SPO 1997 04 01 04 48 44 6.2 -9 670.60 -60.0 -59.3 -60.1 60 -99 SPO 1997 04 01 04 49 43 6.2 -9 670.60 -60.0 -59.3 -60.1 60 -99 SPO 1997 04 01 04 50 42 6.6 -9 670.60 -60.0 -59.3 -60.0 61 -99 SPO 1997 04 01 04 51 41 6.5 -9 670.60 -59.9 -59.3 -60.0 61 -99 SPO 1997 04 01 04 52 39 6.8 -9 670.50 -59.9 -59.2 -60.0 61 -99 SPO 1997 04 01 04 53 38 7.0 -9 670.50 -59.9 -59.2 -59.9 61 -99 SPO 1997 04 01 04 54 38 6.9 -9 670.50 -59.8 -59.1 -59.8 60 -99 SPO 1997 04 01 04 55 37 7.1 -9 670.50 -59.8 -59.0 -59.8 60 -99 SPO 1997 04 01 04 56 35 7.1 -9 670.50 -59.7 -58.9 -59.7 60 -99 SPO 1997 04 01 04 57 37 6.7 -9 670.50 -59.6 -58.9 -59.7 60 -99 SPO 1997 04 01 04 58 38 6.8 -9 670.50 -59.6 -58.9 -59.7 60 -99 SPO 1997 04 01 04 59 38 6.7 -9 670.50 -59.6 -58.9 -59.7 60 -99 SPO 1997 04 01 05 00 37 7.1 -9 670.50 -59.6 -58.8 -59.7 61 0 SPO 1997 04 01 05 01 36 7.2 -9 670.50 -59.5 -58.7 -59.6 61 -99 SPO 1997 04 01 05 02 37 7.1 -9 670.50 -59.4 -58.7 -59.5 61 -99 SPO 1997 04 01 05 03 35 7.1 -9 670.40 -59.4 -58.7 -59.5 61 -99 SPO 1997 04 01 05 04 36 7.3 -9 670.40 -59.4 -58.8 -59.4 62 -99 SPO 1997 04 01 05 05 34 7.3 -9 670.50 -59.4 -58.7 -59.4 62 -99 SPO 1997 04 01 05 06 35 7.5 -9 670.50 -59.3 -58.7 -59.4 61 -99 SPO 1997 04 01 05 07 35 7.0 -9 670.50 -59.3 -58.7 -59.4 61 -99 SPO 1997 04 01 05 08 33 6.9 -9 670.50 -59.3 -58.7 -59.4 61 -99 SPO 1997 04 01 05 09 32 7.2 -9 670.60 -59.3 -58.6 -59.3 61 -99 SPO 1997 04 01 05 10 32 7.0 -9 670.50 -59.2 -58.6 -59.3 61 -99 SPO 1997 04 01 05 11 32 6.9 -9 670.60 -59.2 -58.6 -59.3 61 -99 SPO 1997 04 01 05 12 32 6.8 -9 670.60 -59.2 -58.6 -59.2 62 -99 SPO 1997 04 01 05 13 33 6.7 -9 670.60 -59.1 -58.6 -59.3 61 -99 SPO 1997 04 01 05 14 35 6.5 -9 670.60 -59.2 -58.6 -59.3 62 -99 SPO 1997 04 01 05 15 35 6.5 -9 670.60 -59.2 -58.6 -59.3 62 -99 SPO 1997 04 01 05 16 35 6.2 -9 670.60 -59.2 -58.6 -59.3 62 -99 SPO 1997 04 01 05 17 35 6.4 -9 670.60 -59.2 -58.6 -59.3 61 -99 SPO 1997 04 01 05 18 36 6.1 -9 670.60 -59.2 -58.6 -59.3 61 -99 SPO 1997 04 01 05 19 36 6.0 -9 670.60 -59.2 -58.8 -59.3 61 -99 SPO 1997 04 01 05 20 37 6.2 -9 670.70 -59.2 -58.8 -59.3 60 -99 SPO 1997 04 01 05 21 37 5.9 -9 670.70 -59.2 -58.8 -59.4 60 -99 SPO 1997 04 01 05 22 38 5.8 -9 670.70 -59.3 -58.8 -59.3 61 -99 SPO 1997 04 01 05 23 38 5.7 -9 670.70 -59.3 -58.8 -59.4 61 -99 SPO 1997 04 01 05 24 39 5.5 -9 670.70 -59.3 -58.8 -59.4 62 -99 SPO 1997 04 01 05 25 39 5.7 -9 670.70 -59.2 -58.8 -59.4 61 -99 SPO 1997 04 01 05 26 39 5.8 -9 670.70 -59.2 -58.8 -59.4 62 -99 SPO 1997 04 01 05 27 37 6.1 -9 670.60 -59.3 -58.8 -59.4 62 -99 SPO 1997 04 01 05 28 35 6.0 -9 670.60 -59.3 -58.8 -59.4 62 -99 SPO 1997 04 01 05 29 35 6.4 -9 670.60 -59.3 -58.8 -59.3 61 -99 SPO 1997 04 01 05 30 36 6.2 -9 670.60 -59.2 -58.7 -59.3 61 -99 SPO 1997 04 01 05 31 36 6.1 -9 670.60 -59.2 -58.7 -59.3 60 -99 SPO 1997 04 01 05 32 35 6.2 -9 670.60 -59.2 -58.7 -59.3 59 -99 SPO 1997 04 01 05 33 40 5.5 -9 670.70 -59.2 -58.8 -59.3 60 -99 SPO 1997 04 01 05 34 40 5.4 -9 670.70 -59.3 -58.9 -59.4 61 -99 SPO 1997 04 01 05 35 42 4.9 -9 670.80 -59.3 -58.9 -59.4 61 -99 SPO 1997 04 01 05 36 42 4.5 -9 670.80 -59.3 -58.9 -59.4 61 -99 SPO 1997 04 01 05 37 42 4.3 -9 670.80 -59.3 -59.0 -59.4 61 -99 SPO 1997 04 01 05 38 39 4.5 -9 670.80 -59.3 -58.9 -59.4 61 -99 SPO 1997 04 01 05 39 44 4.7 -9 670.80 -59.3 -58.9 -59.4 61 -99 SPO 1997 04 01 05 40 41 4.4 -9 670.80 -59.3 -59.0 -59.4 61 -99 SPO 1997 04 01 05 41 39 4.9 -9 670.80 -59.3 -59.0 -59.5 60 -99 SPO 1997 04 01 05 42 38 5.0 -9 670.80 -59.4 -59.0 -59.5 60 -99 SPO 1997 04 01 05 43 39 4.8 -9 670.80 -59.4 -59.0 -59.5 59 -99 SPO 1997 04 01 05 44 39 4.9 -9 670.80 -59.4 -59.0 -59.5 59 -99 SPO 1997 04 01 05 45 39 4.7 -9 670.80 -59.5 -59.0 -59.6 61 -99 SPO 1997 04 01 05 46 40 4.9 -9 670.80 -59.5 -59.0 -59.6 61 -99 SPO 1997 04 01 05 47 41 5.3 -9 670.80 -59.5 -58.9 -59.6 61 -99 SPO 1997 04 01 05 48 40 5.4 -9 670.80 -59.5 -58.9 -59.5 61 -99 SPO 1997 04 01 05 49 40 5.4 -9 670.80 -59.4 -58.8 -59.5 60 -99 SPO 1997 04 01 05 50 39 5.6 -9 670.70 -59.5 -58.8 -59.5 61 -99 SPO 1997 04 01 05 51 37 6.1 -9 670.80 -59.5 -58.8 -59.6 60 -99 SPO 1997 04 01 05 52 37 6.0 -9 670.70 -59.4 -58.8 -59.4 59 -99 SPO 1997 04 01 05 53 36 6.1 -9 670.70 -59.4 -58.8 -59.4 59 -99 SPO 1997 04 01 05 54 37 6.3 -9 670.60 -59.4 -58.8 -59.6 59 -99 SPO 1997 04 01 05 55 36 6.4 -9 670.60 -59.5 -58.8 -59.6 60 -99 SPO 1997 04 01 05 56 36 6.5 -9 670.60 -59.5 -58.8 -59.6 60 -99 SPO 1997 04 01 05 57 36 6.4 -9 670.70 -59.5 -58.7 -59.6 61 -99 SPO 1997 04 01 05 58 36 6.0 -9 670.70 -59.5 -58.7 -59.6 61 -99 SPO 1997 04 01 05 59 39 5.5 -9 670.80 -59.5 -58.8 -59.6 61 -99 SPO 1997 04 01 06 00 42 5.0 -9 670.80 -59.5 -58.8 -59.6 61 0 SPO 1997 04 01 06 01 45 4.9 -9 670.80 -59.5 -58.8 -59.6 61 -99 SPO 1997 04 01 06 02 45 4.4 -9 670.90 -59.6 -58.8 -59.6 62 -99 SPO 1997 04 01 06 03 48 4.2 -9 670.90 -59.6 -58.8 -59.6 60 -99 SPO 1997 04 01 06 04 49 4.3 -9 670.90 -59.6 -58.9 -59.7 60 -99 SPO 1997 04 01 06 05 46 4.4 -9 670.80 -59.6 -58.9 -59.7 59 -99 SPO 1997 04 01 06 06 45 5.1 -9 670.80 -59.7 -58.9 -59.7 59 -99 SPO 1997 04 01 06 07 44 5.3 -9 670.80 -59.7 -58.9 -59.8 59 -99 SPO 1997 04 01 06 08 43 5.5 -9 670.80 -59.8 -58.9 -59.8 60 -99 SPO 1997 04 01 06 09 41 5.8 -9 670.70 -59.8 -58.9 -59.9 60 -99 SPO 1997 04 01 06 10 40 5.9 -9 670.80 -59.8 -58.9 -59.9 60 -99 SPO 1997 04 01 06 11 39 5.8 -9 670.80 -59.9 -58.9 -60.0 61 -99 SPO 1997 04 01 06 12 40 5.6 -9 670.80 -59.9 -58.9 -60.0 61 -99 SPO 1997 04 01 06 13 42 5.2 -9 670.80 -59.9 -58.8 -60.0 61 -99 SPO 1997 04 01 06 14 46 4.8 -9 670.90 -59.9 -58.9 -60.0 60 -99 SPO 1997 04 01 06 15 51 4.3 -9 670.90 -60.0 -58.9 -60.0 60 -99 SPO 1997 04 01 06 16 54 3.9 -9 671.00 -60.0 -59.0 -60.0 60 -99 SPO 1997 04 01 06 17 59 3.5 -9 671.00 -60.0 -59.2 -60.0 60 -99 SPO 1997 04 01 06 18 61 3.6 -9 671.00 -60.2 -59.2 -60.2 60 -99 SPO 1997 04 01 06 19 60 3.5 -9 671.00 -60.3 -59.3 -60.4 60 -99 SPO 1997 04 01 06 20 54 4.2 -9 670.90 -60.5 -59.3 -60.5 59 -99 SPO 1997 04 01 06 21 49 4.4 -9 670.80 -60.6 -59.3 -60.5 59 -99 SPO 1997 04 01 06 22 47 4.7 -9 670.80 -60.6 -59.3 -60.6 59 -99 SPO 1997 04 01 06 23 46 4.8 -9 670.80 -60.7 -59.3 -60.7 59 -99 SPO 1997 04 01 06 24 48 4.8 -9 670.80 -60.8 -59.3 -60.8 60 -99 SPO 1997 04 01 06 25 49 4.8 -9 670.80 -60.9 -59.4 -60.9 60 -99 SPO 1997 04 01 06 26 50 4.7 -9 670.80 -60.9 -59.4 -60.9 59 -99 SPO 1997 04 01 06 27 50 4.6 -9 670.80 -61.0 -59.4 -60.9 59 -99 SPO 1997 04 01 06 28 53 4.4 -9 670.80 -61.0 -59.4 -60.9 59 -99 SPO 1997 04 01 06 29 53 4.5 -9 670.80 -61.0 -59.4 -61.0 59 -99 SPO 1997 04 01 06 30 53 4.4 -9 670.90 -61.0 -59.4 -61.0 59 -99 SPO 1997 04 01 06 31 53 4.4 -9 670.90 -61.1 -59.4 -61.0 59 -99 SPO 1997 04 01 06 32 52 4.4 -9 671.00 -61.1 -59.4 -61.0 59 -99 SPO 1997 04 01 06 33 50 4.6 -9 671.00 -61.1 -59.4 -61.0 59 -99 SPO 1997 04 01 06 34 49 4.7 -9 671.00 -61.1 -59.4 -61.0 60 -99 SPO 1997 04 01 06 35 49 4.8 -9 670.90 -61.0 -59.3 -61.0 59 -99 SPO 1997 04 01 06 36 49 4.9 -9 670.90 -61.1 -59.3 -61.1 59 -99 SPO 1997 04 01 06 37 49 5.0 -9 670.90 -61.1 -59.4 -61.1 59 -99 SPO 1997 04 01 06 38 50 4.9 -9 670.90 -61.1 -59.4 -61.2 59 -99 SPO 1997 04 01 06 39 50 4.9 -9 670.90 -61.2 -59.4 -61.2 59 -99 SPO 1997 04 01 06 40 50 4.8 -9 671.00 -61.2 -59.5 -61.2 59 -99 SPO 1997 04 01 06 41 51 4.7 -9 671.00 -61.3 -59.5 -61.3 59 -99 SPO 1997 04 01 06 42 53 4.6 -9 671.00 -61.3 -59.5 -61.3 59 -99 SPO 1997 04 01 06 43 55 4.6 -9 671.00 -61.3 -59.5 -61.3 59 -99 SPO 1997 04 01 06 44 55 4.5 -9 671.00 -61.3 -59.6 -61.3 60 -99 SPO 1997 04 01 06 45 54 4.5 -9 671.00 -61.3 -59.5 -61.4 60 -99 SPO 1997 04 01 06 46 54 4.6 -9 671.00 -61.3 -59.5 -61.4 60 -99 SPO 1997 04 01 06 47 51 4.8 -9 671.00 -61.4 -59.4 -61.4 61 -99 SPO 1997 04 01 06 48 50 4.8 -9 671.00 -61.4 -59.4 -61.4 61 -99 SPO 1997 04 01 06 49 48 5.2 -9 670.90 -61.3 -59.4 -61.4 59 -99 SPO 1997 04 01 06 50 47 5.3 -9 670.90 -61.3 -59.4 -61.4 59 -99 SPO 1997 04 01 06 51 46 5.5 -9 670.80 -61.3 -59.3 -61.4 59 -99 SPO 1997 04 01 06 52 47 5.6 -9 670.80 -61.3 -59.4 -61.3 59 -99 SPO 1997 04 01 06 53 45 5.8 -9 670.80 -61.3 -59.4 -61.3 59 -99 SPO 1997 04 01 06 54 42 5.9 -9 670.80 -61.3 -59.4 -61.3 59 -99 SPO 1997 04 01 06 55 44 5.5 -9 670.80 -61.2 -59.4 -61.2 59 -99 SPO 1997 04 01 06 56 44 5.7 -9 670.80 -61.2 -59.4 -61.2 60 -99 SPO 1997 04 01 06 57 45 5.6 -9 670.90 -61.2 -59.4 -61.3 60 -99 SPO 1997 04 01 06 58 45 5.6 -9 670.80 -61.2 -59.4 -61.3 60 -99 SPO 1997 04 01 06 59 44 5.5 -9 670.90 -61.2 -59.4 -61.4 60 -99 SPO 1997 04 01 07 00 44 5.8 -9 670.80 -61.2 -59.3 -61.4 59 0 SPO 1997 04 01 07 01 43 5.9 -9 670.80 -61.2 -59.4 -61.3 59 -99 SPO 1997 04 01 07 02 43 5.9 -9 670.80 -61.2 -59.4 -61.3 59 -99 SPO 1997 04 01 07 03 43 6.0 -9 670.80 -61.2 -59.4 -61.3 59 -99 SPO 1997 04 01 07 04 42 6.0 -9 670.80 -61.2 -59.3 -61.3 59 -99 SPO 1997 04 01 07 05 42 6.1 -9 670.80 -61.1 -59.3 -61.2 59 -99 SPO 1997 04 01 07 06 43 6.1 -9 670.90 -61.1 -59.3 -61.2 59 -99 SPO 1997 04 01 07 07 43 6.2 -9 670.90 -61.1 -59.3 -61.2 59 -99 SPO 1997 04 01 07 08 43 6.1 -9 670.90 -61.1 -59.3 -61.2 59 -99 SPO 1997 04 01 07 09 44 6.0 -9 670.90 -61.1 -59.4 -61.2 60 -99 SPO 1997 04 01 07 10 44 6.0 -9 670.80 -61.1 -59.4 -61.2 61 -99 SPO 1997 04 01 07 11 44 6.0 -9 670.80 -61.1 -59.4 -61.2 61 -99 SPO 1997 04 01 07 12 44 5.9 -9 670.80 -61.1 -59.4 -61.2 61 -99 SPO 1997 04 01 07 13 43 6.1 -9 670.80 -61.1 -59.4 -61.1 61 -99 SPO 1997 04 01 07 14 43 6.0 -9 670.80 -61.0 -59.4 -61.1 60 -99 SPO 1997 04 01 07 15 43 5.9 -9 670.80 -61.0 -59.4 -61.1 60 -99 SPO 1997 04 01 07 16 44 5.8 -9 670.80 -61.0 -59.4 -61.0 60 -99 SPO 1997 04 01 07 17 44 5.9 -9 670.80 -60.9 -59.4 -61.0 60 -99 SPO 1997 04 01 07 18 44 5.7 -9 670.80 -60.9 -59.4 -61.0 60 -99 SPO 1997 04 01 07 19 43 5.6 -9 670.80 -60.8 -59.4 -60.9 60 -99 SPO 1997 04 01 07 20 44 5.6 -9 670.90 -60.8 -59.4 -60.9 60 -99 SPO 1997 04 01 07 21 44 5.7 -9 670.90 -60.8 -59.3 -60.9 60 -99 SPO 1997 04 01 07 22 44 5.6 -9 670.90 -60.7 -59.3 -60.8 59 -99 SPO 1997 04 01 07 23 44 5.3 -9 670.90 -60.7 -59.4 -60.8 59 -99 SPO 1997 04 01 07 24 45 5.2 -9 671.00 -60.6 -59.4 -60.7 59 -99 SPO 1997 04 01 07 25 46 5.2 -9 671.00 -60.6 -59.5 -60.7 59 -99 SPO 1997 04 01 07 26 48 5.1 -9 671.00 -60.6 -59.5 -60.7 59 -99 SPO 1997 04 01 07 27 47 4.7 -9 671.00 -60.6 -59.5 -60.7 60 -99 SPO 1997 04 01 07 28 48 5.0 -9 671.00 -60.6 -59.5 -60.7 61 -99 SPO 1997 04 01 07 29 49 4.5 -9 671.00 -60.6 -59.5 -60.7 61 -99 SPO 1997 04 01 07 30 50 4.5 -9 671.10 -60.5 -59.5 -60.7 60 -99 SPO 1997 04 01 07 31 54 4.2 -9 671.10 -60.6 -59.6 -60.7 62 -99 SPO 1997 04 01 07 32 57 3.9 -9 671.10 -60.6 -59.6 -60.7 62 -99 SPO 1997 04 01 07 33 60 3.6 -9 671.10 -60.6 -59.6 -60.8 62 -99 SPO 1997 04 01 07 34 63 3.4 -9 671.10 -60.7 -59.7 -60.8 61 -99 SPO 1997 04 01 07 35 63 3.5 -9 671.10 -60.8 -59.8 -60.9 60 -99 SPO 1997 04 01 07 36 60 3.7 -9 671.10 -60.9 -59.8 -61.0 60 -99 SPO 1997 04 01 07 37 58 3.8 -9 671.10 -60.9 -59.8 -61.0 59 -99 SPO 1997 04 01 07 38 57 4.0 -9 671.10 -61.0 -59.8 -61.0 59 -99 SPO 1997 04 01 07 39 56 4.1 -9 671.10 -61.0 -59.8 -61.1 59 -99 SPO 1997 04 01 07 40 57 4.2 -9 671.20 -61.1 -59.9 -61.2 59 -99 SPO 1997 04 01 07 41 59 3.9 -9 671.20 -61.2 -59.9 -61.2 60 -99 SPO 1997 04 01 07 42 62 3.8 -9 671.20 -61.2 -60.0 -61.3 59 -99 SPO 1997 04 01 07 43 67 3.6 -9 671.30 -61.3 -60.0 -61.3 59 -99 SPO 1997 04 01 07 44 68 3.6 -9 671.30 -61.4 -60.0 -61.4 60 -99 SPO 1997 04 01 07 45 70 3.5 -9 671.40 -61.4 -60.1 -61.4 59 -99 SPO 1997 04 01 07 46 70 3.5 -9 671.30 -61.4 -60.0 -61.4 58 -99 SPO 1997 04 01 07 47 68 3.7 -9 671.30 -61.5 -60.0 -61.4 59 -99 SPO 1997 04 01 07 48 68 3.8 -9 671.30 -61.5 -60.1 -61.5 59 -99 SPO 1997 04 01 07 49 67 3.9 -9 671.30 -61.6 -60.1 -61.5 60 -99 SPO 1997 04 01 07 50 67 4.1 -9 671.30 -61.6 -60.1 -61.6 59 -99 SPO 1997 04 01 07 51 66 4.1 -9 671.30 -61.6 -60.1 -61.6 60 -99 SPO 1997 04 01 07 52 67 4.2 -9 671.30 -61.6 -60.0 -61.6 60 -99 SPO 1997 04 01 07 53 68 4.1 -9 671.30 -61.7 -60.0 -61.7 59 -99 SPO 1997 04 01 07 54 71 3.8 -9 671.30 -61.7 -60.0 -61.7 59 -99 SPO 1997 04 01 07 55 73 3.7 -9 671.40 -61.8 -60.1 -61.8 59 -99 SPO 1997 04 01 07 56 74 3.6 -9 671.40 -61.8 -60.2 -61.8 59 -99 SPO 1997 04 01 07 57 74 3.7 -9 671.40 -61.9 -60.2 -61.9 59 -99 SPO 1997 04 01 07 58 75 3.8 -9 671.30 -62.0 -60.3 -61.9 58 -99 SPO 1997 04 01 07 59 75 4.0 -9 671.30 -62.0 -60.3 -62.0 58 -99 SPO 1997 04 01 08 00 75 4.1 -9 671.30 -62.0 -60.3 -62.0 58 0 SPO 1997 04 01 08 01 73 4.1 -9 671.30 -62.1 -60.3 -62.0 59 -99 SPO 1997 04 01 08 02 74 4.0 -9 671.30 -62.1 -60.2 -62.0 59 -99 SPO 1997 04 01 08 03 73 4.0 -9 671.40 -62.0 -60.0 -62.0 59 -99 SPO 1997 04 01 08 04 73 4.0 -9 671.40 -61.9 -60.0 -61.9 59 -99 SPO 1997 04 01 08 05 72 3.9 -9 671.40 -61.8 -59.9 -61.9 59 -99 SPO 1997 04 01 08 06 70 4.1 -9 671.40 -61.8 -59.8 -61.9 59 -99 SPO 1997 04 01 08 07 68 4.4 -9 671.30 -61.8 -59.8 -61.9 59 -99 SPO 1997 04 01 08 08 65 4.7 -9 671.30 -61.8 -59.8 -61.9 59 -99 SPO 1997 04 01 08 09 63 4.8 -9 671.30 -61.8 -59.7 -61.9 58 -99 SPO 1997 04 01 08 10 62 4.8 -9 671.30 -61.8 -59.7 -61.9 58 -99 SPO 1997 04 01 08 11 62 4.8 -9 671.30 -61.8 -59.8 -61.9 58 -99 SPO 1997 04 01 08 12 63 4.7 -9 671.40 -61.8 -59.8 -61.9 58 -99 SPO 1997 04 01 08 13 64 4.6 -9 671.40 -61.8 -59.8 -61.8 59 -99 SPO 1997 04 01 08 14 64 4.7 -9 671.40 -61.7 -59.8 -61.8 59 -99 SPO 1997 04 01 08 15 64 4.8 -9 671.40 -61.7 -59.8 -61.8 59 -99 SPO 1997 04 01 08 16 64 5.0 -9 671.30 -61.7 -59.8 -61.8 60 -99 SPO 1997 04 01 08 17 62 5.2 -9 671.30 -61.7 -59.8 -61.8 59 -99 SPO 1997 04 01 08 18 61 5.5 -9 671.30 -61.7 -59.8 -61.8 60 -99 SPO 1997 04 01 08 19 60 5.6 -9 671.30 -61.7 -59.7 -61.8 60 -99 SPO 1997 04 01 08 20 59 5.5 -9 671.30 -61.7 -59.7 -61.8 59 -99 SPO 1997 04 01 08 21 60 5.6 -9 671.30 -61.7 -59.7 -61.8 59 -99 SPO 1997 04 01 08 22 61 5.4 -9 671.30 -61.6 -59.7 -61.8 58 -99 SPO 1997 04 01 08 23 62 5.3 -9 671.30 -61.6 -59.7 -61.7 58 -99 SPO 1997 04 01 08 24 62 5.3 -9 671.30 -61.6 -59.7 -61.7 58 -99 SPO 1997 04 01 08 25 61 5.3 -9 671.30 -61.6 -59.7 -61.7 59 -99 SPO 1997 04 01 08 26 60 5.4 -9 671.30 -61.6 -59.8 -61.7 59 -99 SPO 1997 04 01 08 27 57 5.6 -9 671.30 -61.6 -59.8 -61.7 60 -99 SPO 1997 04 01 08 28 55 5.8 -9 671.30 -61.6 -59.8 -61.7 60 -99 SPO 1997 04 01 08 29 54 6.0 -9 671.30 -61.6 -59.7 -61.7 60 -99 SPO 1997 04 01 08 30 53 6.1 -9 671.20 -61.6 -59.7 -61.7 61 -99 SPO 1997 04 01 08 31 53 6.0 -9 671.20 -61.6 -59.7 -61.7 61 -99 SPO 1997 04 01 08 32 53 5.8 -9 671.20 -61.6 -59.7 -61.7 60 -99 SPO 1997 04 01 08 33 53 5.9 -9 671.30 -61.6 -59.6 -61.7 60 -99 SPO 1997 04 01 08 34 52 6.0 -9 671.20 -61.6 -59.6 -61.7 60 -99 SPO 1997 04 01 08 35 51 6.1 -9 671.20 -61.5 -59.6 -61.7 59 -99 SPO 1997 04 01 08 36 50 6.4 -9 671.20 -61.6 -59.6 -61.6 60 -99 SPO 1997 04 01 08 37 49 6.6 -9 671.10 -61.5 -59.5 -61.6 60 -99 SPO 1997 04 01 08 38 48 6.7 -9 671.20 -61.5 -59.4 -61.6 60 -99 SPO 1997 04 01 08 39 47 6.6 -9 671.20 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 08 40 47 6.5 -9 671.20 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 08 41 49 6.4 -9 671.30 -61.5 -59.4 -61.5 60 -99 SPO 1997 04 01 08 42 51 6.2 -9 671.30 -61.5 -59.5 -61.5 61 -99 SPO 1997 04 01 08 43 53 6.0 -9 671.30 -61.5 -59.5 -61.5 61 -99 SPO 1997 04 01 08 44 54 5.8 -9 671.30 -61.4 -59.6 -61.5 59 -99 SPO 1997 04 01 08 45 54 5.9 -9 671.30 -61.4 -59.6 -61.5 59 -99 SPO 1997 04 01 08 46 53 6.0 -9 671.20 -61.4 -59.6 -61.6 59 -99 SPO 1997 04 01 08 47 53 6.3 -9 671.30 -61.5 -59.5 -61.6 60 -99 SPO 1997 04 01 08 48 51 6.4 -9 671.20 -61.5 -59.5 -61.6 61 -99 SPO 1997 04 01 08 49 49 6.6 -9 671.20 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 08 50 47 7.0 -9 671.20 -61.5 -59.4 -61.6 62 -99 SPO 1997 04 01 08 51 46 6.9 -9 671.20 -61.4 -59.3 -61.5 61 -99 SPO 1997 04 01 08 52 46 6.9 -9 671.20 -61.4 -59.2 -61.4 61 -99 SPO 1997 04 01 08 53 46 6.7 -9 671.30 -61.4 -59.2 -61.4 62 -99 SPO 1997 04 01 08 54 47 6.8 -9 671.30 -61.3 -59.2 -61.4 61 -99 SPO 1997 04 01 08 55 48 6.7 -9 671.30 -61.3 -59.2 -61.4 60 -99 SPO 1997 04 01 08 56 48 6.8 -9 671.20 -61.3 -59.3 -61.4 60 -99 SPO 1997 04 01 08 57 48 6.8 -9 671.20 -61.3 -59.3 -61.4 59 -99 SPO 1997 04 01 08 58 48 6.7 -9 671.20 -61.4 -59.4 -61.5 61 -99 SPO 1997 04 01 08 59 48 6.7 -9 671.30 -61.4 -59.4 -61.5 61 -99 SPO 1997 04 01 09 00 48 6.5 -9 671.30 -61.4 -59.4 -61.5 61 0 SPO 1997 04 01 09 01 49 6.2 -9 671.30 -61.4 -59.4 -61.5 61 -99 SPO 1997 04 01 09 02 50 6.0 -9 671.40 -61.4 -59.4 -61.6 61 -99 SPO 1997 04 01 09 03 51 6.0 -9 671.40 -61.5 -59.4 -61.6 62 -99 SPO 1997 04 01 09 04 52 6.0 -9 671.40 -61.5 -59.4 -61.6 62 -99 SPO 1997 04 01 09 05 53 6.0 -9 671.40 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 09 06 52 6.1 -9 671.40 -61.5 -59.4 -61.5 60 -99 SPO 1997 04 01 09 07 52 6.2 -9 671.40 -61.5 -59.4 -61.5 60 -99 SPO 1997 04 01 09 08 51 6.4 -9 671.40 -61.4 -59.4 -61.5 58 -99 SPO 1997 04 01 09 09 51 6.4 -9 671.40 -61.4 -59.4 -61.5 58 -99 SPO 1997 04 01 09 10 50 6.5 -9 671.40 -61.5 -59.4 -61.6 59 -99 SPO 1997 04 01 09 11 51 6.5 -9 671.40 -61.4 -59.3 -61.5 59 -99 SPO 1997 04 01 09 12 51 6.5 -9 671.40 -61.4 -59.4 -61.5 60 -99 SPO 1997 04 01 09 13 52 6.4 -9 671.40 -61.5 -59.4 -61.5 62 -99 SPO 1997 04 01 09 14 52 6.4 -9 671.40 -61.5 -59.4 -61.5 62 -99 SPO 1997 04 01 09 15 52 6.3 -9 671.40 -61.5 -59.4 -61.5 62 -99 SPO 1997 04 01 09 16 53 6.2 -9 671.40 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 09 17 52 6.1 -9 671.40 -61.5 -59.5 -61.6 61 -99 SPO 1997 04 01 09 18 52 6.1 -9 671.40 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 09 19 52 6.0 -9 671.50 -61.5 -59.4 -61.6 60 -99 SPO 1997 04 01 09 20 53 6.0 -9 671.50 -61.5 -59.4 -61.6 60 -99 SPO 1997 04 01 09 21 55 5.8 -9 671.50 -61.5 -59.4 -61.6 60 -99 SPO 1997 04 01 09 22 56 5.9 -9 671.50 -61.5 -59.4 -61.6 61 -99 SPO 1997 04 01 09 23 57 6.0 -9 671.40 -61.5 -59.4 -61.6 60 -99 SPO 1997 04 01 09 24 58 5.9 -9 671.40 -61.4 -59.5 -61.5 59 -99 SPO 1997 04 01 09 25 58 6.0 -9 671.40 -61.4 -59.5 -61.6 59 -99 SPO 1997 04 01 09 26 59 5.9 -9 671.40 -61.5 -59.5 -61.6 60 -99 SPO 1997 04 01 09 27 59 5.8 -9 671.40 -61.5 -59.6 -61.6 59 -99 SPO 1997 04 01 09 28 59 5.6 -9 671.50 -61.5 -59.7 -61.6 58 -99 SPO 1997 04 01 09 29 60 5.6 -9 671.50 -61.6 -59.7 -61.6 59 -99 SPO 1997 04 01 09 30 61 5.3 -9 671.50 -61.6 -59.8 -61.7 58 -99 SPO 1997 04 01 09 31 62 5.3 -9 671.50 -61.6 -59.9 -61.7 58 -99 SPO 1997 04 01 09 32 62 5.4 -9 671.50 -61.6 -59.9 -61.7 59 -99 SPO 1997 04 01 09 33 61 5.5 -9 671.50 -61.6 -59.9 -61.7 59 -99 SPO 1997 04 01 09 34 60 5.6 -9 671.40 -61.6 -59.9 -61.7 59 -99 SPO 1997 04 01 09 35 59 5.8 -9 671.40 -61.6 -59.9 -61.7 60 -99 SPO 1997 04 01 09 36 58 5.9 -9 671.40 -61.6 -59.8 -61.7 59 -99 SPO 1997 04 01 09 37 58 6.0 -9 671.40 -61.7 -59.8 -61.7 60 -99 SPO 1997 04 01 09 38 58 6.0 -9 671.40 -61.6 -59.8 -61.7 59 -99 SPO 1997 04 01 09 39 58 5.9 -9 671.50 -61.6 -59.7 -61.7 59 -99 SPO 1997 04 01 09 40 58 5.6 -9 671.50 -61.6 -59.8 -61.7 59 -99 SPO 1997 04 01 09 41 59 5.6 -9 671.50 -61.6 -59.8 -61.8 58 -99 SPO 1997 04 01 09 42 59 5.5 -9 671.50 -61.7 -59.8 -61.8 58 -99 SPO 1997 04 01 09 43 60 5.5 -9 671.50 -61.7 -59.9 -61.8 58 -99 SPO 1997 04 01 09 44 59 5.6 -9 671.50 -61.7 -59.9 -61.8 58 -99 SPO 1997 04 01 09 45 58 5.5 -9 671.50 -61.7 -59.9 -61.8 58 -99 SPO 1997 04 01 09 46 58 5.5 -9 671.50 -61.8 -59.9 -61.8 59 -99 SPO 1997 04 01 09 47 57 5.5 -9 671.50 -61.8 -60.0 -61.8 60 -99 SPO 1997 04 01 09 48 57 5.5 -9 671.50 -61.8 -60.0 -61.8 60 -99 SPO 1997 04 01 09 49 57 5.5 -9 671.50 -61.8 -60.0 -61.8 61 -99 SPO 1997 04 01 09 50 57 5.5 -9 671.50 -61.8 -60.1 -61.9 60 -99 SPO 1997 04 01 09 51 57 5.5 -9 671.50 -61.8 -60.1 -61.9 60 -99 SPO 1997 04 01 09 52 57 5.4 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 09 53 57 5.5 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 09 54 56 5.6 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 09 55 56 5.6 -9 671.50 -61.8 -60.1 -61.9 58 -99 SPO 1997 04 01 09 56 55 5.7 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 09 57 54 5.7 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 09 58 54 5.7 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 09 59 54 5.7 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 10 00 54 5.8 -9 671.50 -61.9 -60.1 -62.0 61 0 SPO 1997 04 01 10 01 55 5.7 -9 671.50 -61.9 -60.1 -62.0 61 -99 SPO 1997 04 01 10 02 55 5.8 -9 671.50 -61.9 -60.2 -62.0 60 -99 SPO 1997 04 01 10 03 57 5.7 -9 671.50 -61.9 -60.2 -62.0 60 -99 SPO 1997 04 01 10 04 58 5.7 -9 671.50 -61.9 -60.2 -62.0 60 -99 SPO 1997 04 01 10 05 58 5.7 -9 671.50 -61.9 -60.2 -62.0 59 -99 SPO 1997 04 01 10 06 58 5.6 -9 671.50 -62.0 -60.2 -62.0 60 -99 SPO 1997 04 01 10 07 58 5.6 -9 671.50 -62.0 -60.2 -62.1 60 -99 SPO 1997 04 01 10 08 57 5.6 -9 671.50 -61.9 -60.1 -62.1 59 -99 SPO 1997 04 01 10 09 55 5.8 -9 671.50 -61.9 -60.1 -62.0 59 -99 SPO 1997 04 01 10 10 54 6.1 -9 671.50 -62.0 -60.0 -62.0 61 -99 SPO 1997 04 01 10 11 53 6.1 -9 671.50 -61.9 -60.0 -62.0 60 -99 SPO 1997 04 01 10 12 53 6.1 -9 671.50 -62.0 -60.0 -62.0 61 -99 SPO 1997 04 01 10 13 53 6.1 -9 671.50 -61.9 -60.0 -62.0 59 -99 SPO 1997 04 01 10 14 53 6.0 -9 671.50 -62.0 -60.1 -62.0 60 -99 SPO 1997 04 01 10 15 54 5.9 -9 671.50 -62.0 -60.1 -62.0 60 -99 SPO 1997 04 01 10 16 56 5.8 -9 671.50 -62.0 -60.1 -62.0 60 -99 SPO 1997 04 01 10 17 56 5.8 -9 671.50 -62.0 -60.2 -62.0 59 -99 SPO 1997 04 01 10 18 57 5.8 -9 671.50 -62.0 -60.2 -62.0 59 -99 SPO 1997 04 01 10 19 56 5.7 -9 671.50 -62.0 -60.2 -62.0 60 -99 SPO 1997 04 01 10 20 55 5.8 -9 671.50 -61.9 -60.1 -62.0 60 -99 SPO 1997 04 01 10 21 54 5.8 -9 671.50 -62.0 -60.1 -62.0 61 -99 SPO 1997 04 01 10 22 53 6.1 -9 671.50 -62.0 -60.1 -62.0 61 -99 SPO 1997 04 01 10 23 53 6.3 -9 671.50 -61.9 -60.0 -62.0 60 -99 SPO 1997 04 01 10 24 54 6.5 -9 671.50 -61.9 -60.0 -62.0 60 -99 SPO 1997 04 01 10 25 54 6.6 -9 671.40 -61.9 -60.0 -62.0 60 -99 SPO 1997 04 01 10 26 54 6.8 -9 671.40 -61.9 -60.0 -62.0 60 -99 SPO 1997 04 01 10 27 53 6.9 -9 671.40 -61.9 -60.0 -62.0 60 -99 SPO 1997 04 01 10 28 53 6.9 -9 671.50 -61.8 -60.0 -61.9 58 -99 SPO 1997 04 01 10 29 52 6.9 -9 671.50 -61.9 -60.0 -61.9 59 -99 SPO 1997 04 01 10 30 51 6.8 -9 671.50 -61.9 -60.0 -61.9 59 -99 SPO 1997 04 01 10 31 51 6.8 -9 671.50 -61.9 -60.0 -61.9 60 -99 SPO 1997 04 01 10 32 52 6.7 -9 671.50 -61.8 -60.0 -61.9 60 -99 SPO 1997 04 01 10 33 53 6.5 -9 671.50 -61.8 -60.0 -61.9 61 -99 SPO 1997 04 01 10 34 54 6.5 -9 671.50 -61.8 -60.1 -61.9 61 -99 SPO 1997 04 01 10 35 55 6.4 -9 671.50 -61.8 -60.1 -61.9 61 -99 SPO 1997 04 01 10 36 55 6.3 -9 671.50 -61.8 -60.1 -61.9 60 -99 SPO 1997 04 01 10 37 55 6.2 -9 671.50 -61.8 -60.1 -61.9 60 -99 SPO 1997 04 01 10 38 54 6.2 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 10 39 53 6.3 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 10 40 53 6.2 -9 671.50 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 10 41 52 6.1 -9 671.60 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 10 42 53 6.1 -9 671.60 -61.8 -60.1 -61.9 59 -99 SPO 1997 04 01 10 43 53 5.8 -9 671.60 -61.7 -60.2 -61.8 58 -99 SPO 1997 04 01 10 44 55 5.6 -9 671.60 -61.8 -60.2 -61.8 60 -99 SPO 1997 04 01 10 45 56 5.5 -9 671.60 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 10 46 56 5.4 -9 671.60 -61.8 -60.4 -61.9 60 -99 SPO 1997 04 01 10 47 56 5.4 -9 671.60 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 10 48 54 5.4 -9 671.60 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 10 49 53 5.6 -9 671.60 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 10 50 53 5.6 -9 671.60 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 10 51 53 5.6 -9 671.70 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 10 52 54 5.7 -9 671.70 -61.8 -60.2 -61.9 60 -99 SPO 1997 04 01 10 53 55 5.6 -9 671.70 -61.8 -60.2 -61.9 59 -99 SPO 1997 04 01 10 54 59 5.3 -9 671.70 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 10 55 61 5.2 -9 671.70 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 10 56 62 5.0 -9 671.70 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 10 57 61 5.0 -9 671.70 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 10 58 61 4.9 -9 671.70 -61.8 -60.4 -61.9 60 -99 SPO 1997 04 01 10 59 60 5.1 -9 671.70 -61.8 -60.4 -61.9 59 -99 SPO 1997 04 01 11 00 59 5.0 -9 671.70 -61.8 -60.4 -61.9 59 0 SPO 1997 04 01 11 01 59 4.9 -9 671.70 -61.8 -60.4 -61.9 59 -99 SPO 1997 04 01 11 02 59 4.9 -9 671.70 -61.8 -60.4 -61.9 58 -99 SPO 1997 04 01 11 03 60 5.0 -9 671.70 -61.8 -60.4 -61.9 58 -99 SPO 1997 04 01 11 04 61 5.0 -9 671.70 -61.8 -60.4 -61.9 59 -99 SPO 1997 04 01 11 05 61 5.0 -9 671.70 -61.8 -60.4 -61.9 60 -99 SPO 1997 04 01 11 06 61 5.0 -9 671.70 -61.8 -60.4 -61.9 60 -99 SPO 1997 04 01 11 07 60 5.1 -9 671.70 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 11 08 59 5.2 -9 671.70 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 11 09 58 5.1 -9 671.60 -61.8 -60.3 -61.9 61 -99 SPO 1997 04 01 11 10 57 5.0 -9 671.70 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 11 11 57 4.8 -9 671.70 -61.8 -60.3 -61.9 60 -99 SPO 1997 04 01 11 12 58 4.7 -9 671.70 -61.8 -60.3 -61.8 60 -99 SPO 1997 04 01 11 13 60 4.7 -9 671.70 -61.8 -60.3 -61.8 59 -99 SPO 1997 04 01 11 14 60 4.7 -9 671.70 -61.7 -60.4 -61.8 58 -99 SPO 1997 04 01 11 15 61 4.6 -9 671.70 -61.8 -60.4 -61.8 59 -99 SPO 1997 04 01 11 16 61 4.8 -9 671.70 -61.8 -60.5 -61.8 60 -99 SPO 1997 04 01 11 17 60 4.7 -9 671.70 -61.8 -60.5 -61.8 60 -99 SPO 1997 04 01 11 18 60 4.8 -9 671.70 -61.8 -60.5 -61.8 61 -99 SPO 1997 04 01 11 19 60 4.6 -9 671.70 -61.8 -60.5 -61.8 61 -99 SPO 1997 04 01 11 20 60 4.5 -9 671.70 -61.8 -60.5 -61.8 61 -99 SPO 1997 04 01 11 21 59 4.6 -9 671.70 -61.8 -60.5 -61.8 61 -99 SPO 1997 04 01 11 22 58 4.5 -9 671.80 -61.8 -60.4 -61.8 61 -99 SPO 1997 04 01 11 23 58 4.3 -9 671.80 -61.7 -60.4 -61.8 59 -99 SPO 1997 04 01 11 24 59 4.3 -9 671.80 -61.7 -60.3 -61.8 59 -99 SPO 1997 04 01 11 25 57 4.3 -9 671.80 -61.6 -60.3 -61.7 59 -99 SPO 1997 04 01 11 26 58 4.4 -9 671.80 -61.6 -60.3 -61.7 59 -99 SPO 1997 04 01 11 27 57 4.5 -9 671.80 -61.6 -60.3 -61.7 60 -99 SPO 1997 04 01 11 28 57 4.7 -9 671.70 -61.6 -60.2 -61.7 61 -99 SPO 1997 04 01 11 29 56 4.7 -9 671.70 -61.5 -60.2 -61.6 61 -99 SPO 1997 04 01 11 30 56 4.8 -9 671.70 -61.5 -60.3 -61.6 61 -99 SPO 1997 04 01 11 31 56 4.9 -9 671.70 -61.5 -60.3 -61.6 61 -99 SPO 1997 04 01 11 32 57 4.8 -9 671.70 -61.5 -60.3 -61.6 61 -99 SPO 1997 04 01 11 33 56 4.8 -9 671.70 -61.5 -60.3 -61.6 61 -99 SPO 1997 04 01 11 34 56 4.8 -9 671.70 -61.4 -60.2 -61.5 60 -99 SPO 1997 04 01 11 35 56 4.8 -9 671.80 -61.4 -60.2 -61.5 60 -99 SPO 1997 04 01 11 36 56 4.8 -9 671.80 -61.4 -60.2 -61.5 60 -99 SPO 1997 04 01 11 37 56 4.7 -9 671.80 -61.3 -60.2 -61.4 59 -99 SPO 1997 04 01 11 38 57 4.7 -9 671.80 -61.3 -60.2 -61.4 59 -99 SPO 1997 04 01 11 39 59 4.4 -9 671.80 -61.2 -60.2 -61.4 59 -99 SPO 1997 04 01 11 40 59 4.2 -9 671.80 -61.2 -60.2 -61.3 60 -99 SPO 1997 04 01 11 41 59 4.3 -9 671.80 -61.2 -60.2 -61.3 60 -99 SPO 1997 04 01 11 42 58 4.2 -9 671.80 -61.2 -60.3 -61.3 61 -99 SPO 1997 04 01 11 43 57 4.4 -9 671.80 -61.1 -60.3 -61.2 60 -99 SPO 1997 04 01 11 44 56 4.5 -9 671.80 -61.1 -60.2 -61.2 60 -99 SPO 1997 04 01 11 45 55 4.4 -9 671.80 -61.0 -60.2 -61.2 59 -99 SPO 1997 04 01 11 46 55 4.6 -9 671.80 -61.0 -60.3 -61.1 60 -99 SPO 1997 04 01 11 47 55 4.6 -9 671.80 -61.0 -60.3 -61.1 61 -99 SPO 1997 04 01 11 48 56 4.7 -9 671.80 -60.9 -60.3 -61.0 60 -99 SPO 1997 04 01 11 49 56 4.7 -9 671.80 -60.9 -60.3 -61.0 60 -99 SPO 1997 04 01 11 50 55 4.7 -9 671.70 -60.8 -60.3 -60.9 60 -99 SPO 1997 04 01 11 51 54 4.6 -9 671.70 -60.8 -60.2 -60.9 61 -99 SPO 1997 04 01 11 52 53 4.6 -9 671.70 -60.8 -60.2 -60.9 62 -99 SPO 1997 04 01 11 53 52 4.9 -9 671.70 -60.7 -60.1 -60.8 61 -99 SPO 1997 04 01 11 54 52 4.9 -9 671.70 -60.6 -60.1 -60.8 61 -99 SPO 1997 04 01 11 55 51 4.8 -9 671.70 -60.6 -60.1 -60.7 62 -99 SPO 1997 04 01 11 56 51 5.0 -9 671.70 -60.5 -60.0 -60.6 61 -99 SPO 1997 04 01 11 57 49 5.1 -9 671.80 -60.5 -59.9 -60.6 61 -99 SPO 1997 04 01 11 58 50 5.3 -9 671.70 -60.4 -59.9 -60.5 61 -99 SPO 1997 04 01 11 59 49 5.4 -9 671.70 -60.3 -59.9 -60.4 60 -99 SPO 1997 04 01 12 00 47 5.5 -9 671.70 -60.3 -59.9 -60.4 60 0 SPO 1997 04 01 12 01 46 5.5 -9 671.70 -60.2 -59.9 -60.3 60 -99 SPO 1997 04 01 12 02 45 5.8 -9 671.70 -60.2 -60.0 -60.3 60 -99 SPO 1997 04 01 12 03 46 5.8 -9 671.70 -60.2 -59.9 -60.3 62 -99 SPO 1997 04 01 12 04 44 5.8 -9 671.70 -60.2 -59.8 -60.3 62 -99 SPO 1997 04 01 12 05 44 5.6 -9 671.70 -60.1 -59.8 -60.2 62 -99 SPO 1997 04 01 12 06 44 5.7 -9 671.70 -60.1 -59.8 -60.2 63 -99 SPO 1997 04 01 12 07 44 5.8 -9 671.70 -60.0 -59.8 -60.1 62 -99 SPO 1997 04 01 12 08 44 5.5 -9 671.80 -60.0 -59.7 -60.1 62 -99 SPO 1997 04 01 12 09 44 5.5 -9 671.80 -59.9 -59.7 -60.1 61 -99 SPO 1997 04 01 12 10 44 5.5 -9 671.80 -59.9 -59.7 -60.0 61 -99 SPO 1997 04 01 12 11 45 5.7 -9 671.80 -59.9 -59.6 -60.0 61 -99 SPO 1997 04 01 12 12 45 5.7 -9 671.80 -59.9 -59.6 -60.0 61 -99 SPO 1997 04 01 12 13 45 5.6 -9 671.80 -59.8 -59.6 -60.0 60 -99 SPO 1997 04 01 12 14 44 5.9 -9 671.70 -59.8 -59.6 -59.9 61 -99 SPO 1997 04 01 12 15 45 5.8 -9 671.70 -59.8 -59.6 -59.9 61 -99 SPO 1997 04 01 12 16 44 5.8 -9 671.70 -59.8 -59.6 -59.9 62 -99 SPO 1997 04 01 12 17 44 5.8 -9 671.80 -59.8 -59.7 -59.9 63 -99 SPO 1997 04 01 12 18 43 6.0 -9 671.80 -59.8 -59.6 -59.9 63 -99 SPO 1997 04 01 12 19 43 5.7 -9 671.80 -59.8 -59.6 -59.9 63 -99 SPO 1997 04 01 12 20 43 5.8 -9 671.80 -59.8 -59.6 -59.9 62 -99 SPO 1997 04 01 12 21 43 5.8 -9 671.80 -59.8 -59.6 -59.9 62 -99 SPO 1997 04 01 12 22 43 5.7 -9 671.80 -59.7 -59.6 -59.8 60 -99 SPO 1997 04 01 12 23 44 5.5 -9 671.80 -59.7 -59.6 -59.8 60 -99 SPO 1997 04 01 12 24 43 5.8 -9 671.80 -59.7 -59.6 -59.8 60 -99 SPO 1997 04 01 12 25 42 5.5 -9 671.80 -59.7 -59.6 -59.8 60 -99 SPO 1997 04 01 12 26 42 5.7 -9 671.80 -59.7 -59.5 -59.8 60 -99 SPO 1997 04 01 12 27 42 5.6 -9 671.80 -59.7 -59.5 -59.8 61 -99 SPO 1997 04 01 12 28 41 5.5 -9 671.80 -59.7 -59.5 -59.8 62 -99 SPO 1997 04 01 12 29 42 5.6 -9 671.80 -59.7 -59.5 -59.8 62 -99 SPO 1997 04 01 12 30 42 5.6 -9 671.80 -59.7 -59.5 -59.8 61 -99 SPO 1997 04 01 12 31 42 5.4 -9 671.80 -59.6 -59.5 -59.8 60 -99 SPO 1997 04 01 12 32 42 5.6 -9 671.80 -59.6 -59.5 -59.8 60 -99 SPO 1997 04 01 12 33 42 5.5 -9 671.80 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 12 34 42 5.4 -9 671.80 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 12 35 43 5.6 -9 671.80 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 12 36 44 5.5 -9 671.80 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 12 37 44 5.5 -9 671.80 -59.6 -59.5 -59.7 61 -99 SPO 1997 04 01 12 38 45 5.6 -9 671.90 -59.6 -59.5 -59.7 61 -99 SPO 1997 04 01 12 39 45 5.6 -9 671.90 -59.6 -59.5 -59.7 62 -99 SPO 1997 04 01 12 40 43 5.5 -9 671.90 -59.6 -59.5 -59.7 62 -99 SPO 1997 04 01 12 41 43 5.4 -9 671.90 -59.6 -59.5 -59.7 62 -99 SPO 1997 04 01 12 42 43 5.5 -9 671.90 -59.6 -59.4 -59.7 62 -99 SPO 1997 04 01 12 43 43 5.5 -9 671.90 -59.6 -59.4 -59.7 62 -99 SPO 1997 04 01 12 44 43 5.5 -9 671.90 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 12 45 43 5.5 -9 671.90 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 12 46 43 5.2 -9 671.90 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 12 47 44 5.3 -9 671.90 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 12 48 43 5.1 -9 671.90 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 12 49 44 5.1 -9 672.00 -59.6 -59.6 -59.7 61 -99 SPO 1997 04 01 12 50 45 5.0 -9 672.00 -59.6 -59.6 -59.7 61 -99 SPO 1997 04 01 12 51 46 5.0 -9 672.00 -59.6 -59.5 -59.7 61 -99 SPO 1997 04 01 12 52 44 5.1 -9 671.90 -59.6 -59.5 -59.7 61 -99 SPO 1997 04 01 12 53 44 5.2 -9 671.90 -59.6 -59.5 -59.7 61 -99 SPO 1997 04 01 12 54 42 5.4 -9 671.90 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 12 55 43 5.5 -9 671.90 -59.6 -59.4 -59.6 61 -99 SPO 1997 04 01 12 56 43 5.3 -9 671.90 -59.6 -59.4 -59.6 61 -99 SPO 1997 04 01 12 57 43 5.3 -9 671.90 -59.6 -59.4 -59.6 61 -99 SPO 1997 04 01 12 58 42 5.3 -9 671.90 -59.5 -59.3 -59.6 61 -99 SPO 1997 04 01 12 59 42 5.3 -9 672.00 -59.5 -59.3 -59.6 61 -99 SPO 1997 04 01 13 00 43 5.3 -9 672.00 -59.5 -59.3 -59.6 62 0 SPO 1997 04 01 13 01 42 5.4 -9 672.00 -59.5 -59.3 -59.6 61 -99 SPO 1997 04 01 13 02 43 5.5 -9 672.00 -59.5 -59.3 -59.5 61 -99 SPO 1997 04 01 13 03 44 5.5 -9 671.90 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 04 43 5.5 -9 671.90 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 05 44 5.7 -9 671.90 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 06 44 5.4 -9 671.90 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 07 44 5.7 -9 671.90 -59.4 -59.3 -59.5 60 -99 SPO 1997 04 01 13 08 45 5.5 -9 671.90 -59.4 -59.3 -59.5 60 -99 SPO 1997 04 01 13 09 44 5.9 -9 671.90 -59.4 -59.2 -59.5 60 -99 SPO 1997 04 01 13 10 43 6.0 -9 671.90 -59.4 -59.2 -59.4 60 -99 SPO 1997 04 01 13 11 43 5.9 -9 671.90 -59.4 -59.2 -59.4 61 -99 SPO 1997 04 01 13 12 43 6.0 -9 671.90 -59.4 -59.2 -59.4 61 -99 SPO 1997 04 01 13 13 42 5.8 -9 671.90 -59.4 -59.2 -59.4 62 -99 SPO 1997 04 01 13 14 42 6.1 -9 671.90 -59.4 -59.2 -59.4 62 -99 SPO 1997 04 01 13 15 43 5.9 -9 671.90 -59.3 -59.2 -59.4 62 -99 SPO 1997 04 01 13 16 42 6.0 -9 671.90 -59.3 -59.1 -59.4 61 -99 SPO 1997 04 01 13 17 42 6.0 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 18 41 6.0 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 19 41 6.0 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 20 41 6.0 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 21 42 6.1 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 22 43 5.9 -9 671.90 -59.4 -59.2 -59.4 61 -99 SPO 1997 04 01 13 23 42 5.9 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 24 43 6.1 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 25 42 5.9 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 26 42 6.0 -9 671.90 -59.3 -59.2 -59.4 62 -99 SPO 1997 04 01 13 27 42 5.7 -9 671.90 -59.3 -59.2 -59.4 62 -99 SPO 1997 04 01 13 28 42 5.8 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 29 41 5.9 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 30 41 6.0 -9 671.90 -59.3 -59.1 -59.4 61 -99 SPO 1997 04 01 13 31 41 5.9 -9 671.90 -59.3 -59.1 -59.4 61 -99 SPO 1997 04 01 13 32 41 5.9 -9 671.90 -59.3 -59.1 -59.4 60 -99 SPO 1997 04 01 13 33 41 5.7 -9 671.90 -59.3 -59.2 -59.4 60 -99 SPO 1997 04 01 13 34 41 5.8 -9 671.90 -59.3 -59.2 -59.4 60 -99 SPO 1997 04 01 13 35 41 5.7 -9 671.90 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 36 41 5.5 -9 672.00 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 37 42 5.4 -9 672.00 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 38 43 5.4 -9 672.00 -59.3 -59.3 -59.4 61 -99 SPO 1997 04 01 13 39 43 5.1 -9 672.00 -59.3 -59.3 -59.4 61 -99 SPO 1997 04 01 13 40 44 5.2 -9 672.00 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 41 43 5.3 -9 672.00 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 42 43 5.3 -9 672.00 -59.3 -59.2 -59.4 60 -99 SPO 1997 04 01 13 43 43 5.3 -9 672.00 -59.3 -59.2 -59.4 60 -99 SPO 1997 04 01 13 44 41 5.5 -9 672.00 -59.3 -59.2 -59.4 60 -99 SPO 1997 04 01 13 45 42 5.4 -9 672.00 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 46 42 5.4 -9 672.00 -59.3 -59.2 -59.4 61 -99 SPO 1997 04 01 13 47 43 5.5 -9 672.00 -59.4 -59.2 -59.4 61 -99 SPO 1997 04 01 13 48 43 5.5 -9 672.00 -59.4 -59.2 -59.5 61 -99 SPO 1997 04 01 13 49 43 5.3 -9 672.00 -59.4 -59.2 -59.5 61 -99 SPO 1997 04 01 13 50 43 5.4 -9 672.00 -59.4 -59.3 -59.5 62 -99 SPO 1997 04 01 13 51 43 5.3 -9 672.00 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 52 43 5.3 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 53 42 5.3 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 54 42 5.1 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 55 42 5.1 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 56 41 5.3 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 57 43 5.2 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 58 43 5.4 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 13 59 43 5.3 -9 672.10 -59.4 -59.3 -59.5 61 -99 SPO 1997 04 01 14 00 43 5.5 -9 672.00 -59.5 -59.3 -59.6 62 0 SPO 1997 04 01 14 01 43 5.6 -9 672.00 -59.5 -59.3 -59.6 62 -99 SPO 1997 04 01 14 02 43 5.6 -9 672.00 -59.5 -59.3 -59.6 62 -99 SPO 1997 04 01 14 03 42 5.7 -9 672.00 -59.5 -59.3 -59.6 61 -99 SPO 1997 04 01 14 04 42 5.5 -9 672.00 -59.5 -59.3 -59.6 61 -99 SPO 1997 04 01 14 05 43 5.4 -9 672.00 -59.5 -59.3 -59.6 60 -99 SPO 1997 04 01 14 06 42 5.1 -9 672.00 -59.5 -59.4 -59.6 60 -99 SPO 1997 04 01 14 07 42 5.3 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 08 42 5.2 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 09 43 5.3 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 10 43 5.2 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 11 44 5.1 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 12 44 5.2 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 13 45 5.2 -9 672.00 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 14 45 5.1 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 15 45 5.1 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 16 46 5.1 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 17 46 5.2 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 18 46 5.0 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 19 46 5.3 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 20 46 5.5 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 21 46 5.3 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 22 45 5.4 -9 672.00 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 14 23 44 5.4 -9 671.90 -59.7 -59.5 -59.7 61 -99 SPO 1997 04 01 14 24 44 5.4 -9 671.90 -59.7 -59.5 -59.8 61 -99 SPO 1997 04 01 14 25 43 5.5 -9 671.90 -59.7 -59.5 -59.8 61 -99 SPO 1997 04 01 14 26 44 5.5 -9 671.90 -59.7 -59.5 -59.8 61 -99 SPO 1997 04 01 14 27 44 5.5 -9 672.00 -59.7 -59.5 -59.8 60 -99 SPO 1997 04 01 14 28 44 5.4 -9 672.00 -59.7 -59.5 -59.7 60 -99 SPO 1997 04 01 14 29 44 5.2 -9 672.00 -59.7 -59.4 -59.7 60 -99 SPO 1997 04 01 14 30 44 5.2 -9 672.00 -59.7 -59.4 -59.7 60 -99 SPO 1997 04 01 14 31 43 5.1 -9 672.00 -59.7 -59.4 -59.7 60 -99 SPO 1997 04 01 14 32 43 5.0 -9 672.00 -59.7 -59.4 -59.7 60 -99 SPO 1997 04 01 14 33 44 4.9 -9 672.00 -59.7 -59.4 -59.7 61 -99 SPO 1997 04 01 14 34 43 4.8 -9 672.00 -59.7 -59.4 -59.7 61 -99 SPO 1997 04 01 14 35 43 4.9 -9 672.00 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 36 42 4.9 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 37 41 4.8 -9 672.10 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 14 38 40 4.8 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 39 41 4.7 -9 672.10 -59.6 -59.5 -59.7 60 -99 SPO 1997 04 01 14 40 41 4.9 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 41 41 4.9 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 42 41 4.6 -9 672.20 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 43 42 4.6 -9 672.20 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 44 42 4.7 -9 672.20 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 45 42 4.9 -9 672.20 -59.6 -59.4 -59.7 62 -99 SPO 1997 04 01 14 46 42 4.7 -9 672.20 -59.6 -59.3 -59.6 62 -99 SPO 1997 04 01 14 47 42 4.6 -9 672.20 -59.6 -59.3 -59.6 62 -99 SPO 1997 04 01 14 48 43 4.6 -9 672.20 -59.6 -59.3 -59.7 62 -99 SPO 1997 04 01 14 49 43 4.9 -9 672.20 -59.6 -59.3 -59.7 62 -99 SPO 1997 04 01 14 50 44 4.9 -9 672.20 -59.6 -59.3 -59.6 61 -99 SPO 1997 04 01 14 51 45 4.7 -9 672.20 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 14 52 46 4.9 -9 672.20 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 14 53 46 5.1 -9 672.10 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 14 54 46 5.2 -9 672.10 -59.6 -59.4 -59.7 60 -99 SPO 1997 04 01 14 55 47 5.1 -9 672.20 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 56 46 5.3 -9 672.10 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 57 46 5.2 -9 672.10 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 58 46 5.2 -9 672.10 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 14 59 44 5.5 -9 672.10 -59.6 -59.3 -59.7 61 -99 SPO 1997 04 01 15 00 45 5.4 -9 672.10 -59.6 -59.3 -59.7 61 0 SPO 1997 04 01 15 01 43 5.6 -9 672.10 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 15 02 43 5.6 -9 672.10 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 15 03 44 5.6 -9 672.10 -59.6 -59.3 -59.7 61 -99 SPO 1997 04 01 15 04 43 5.5 -9 672.10 -59.6 -59.3 -59.7 61 -99 SPO 1997 04 01 15 05 43 5.5 -9 672.10 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 15 06 43 5.7 -9 672.10 -59.6 -59.2 -59.7 61 -99 SPO 1997 04 01 15 07 42 5.6 -9 672.10 -59.6 -59.3 -59.7 60 -99 SPO 1997 04 01 15 08 42 5.8 -9 672.10 -59.6 -59.3 -59.7 61 -99 SPO 1997 04 01 15 09 42 5.7 -9 672.10 -59.6 -59.4 -59.7 61 -99 SPO 1997 04 01 15 10 41 5.9 -9 672.10 -59.7 -59.3 -59.8 62 -99 SPO 1997 04 01 15 11 41 6.2 -9 672.00 -59.7 -59.3 -59.8 61 -99 SPO 1997 04 01 15 12 40 6.3 -9 672.00 -59.7 -59.3 -59.7 61 -99 SPO 1997 04 01 15 13 41 6.3 -9 672.00 -59.7 -59.3 -59.7 61 -99 SPO 1997 04 01 15 14 41 6.2 -9 672.00 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 15 41 6.1 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 16 41 6.3 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 17 40 6.0 -9 672.00 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 18 41 6.0 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 19 42 5.9 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 20 42 5.9 -9 672.00 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 21 42 6.0 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 22 42 5.9 -9 672.10 -59.7 -59.2 -59.8 60 -99 SPO 1997 04 01 15 23 41 6.0 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 24 40 6.0 -9 672.10 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 25 40 6.1 -9 672.00 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 26 41 5.9 -9 672.10 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 27 41 5.9 -9 672.10 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 28 41 6.0 -9 672.10 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 29 41 5.9 -9 672.10 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 30 41 6.0 -9 672.10 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 31 42 5.9 -9 672.10 -59.7 -59.3 -59.8 61 -99 SPO 1997 04 01 15 32 42 5.9 -9 672.10 -59.7 -59.4 -59.8 61 -99 SPO 1997 04 01 15 33 42 5.9 -9 672.10 -59.7 -59.4 -59.8 61 -99 SPO 1997 04 01 15 34 42 6.1 -9 672.00 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 35 42 6.3 -9 672.00 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 36 43 6.4 -9 672.00 -59.7 -59.4 -59.8 60 -99 SPO 1997 04 01 15 37 43 6.3 -9 672.00 -59.7 -59.3 -59.8 60 -99 SPO 1997 04 01 15 38 43 6.4 -9 672.00 -59.7 -59.3 -59.9 59 -99 SPO 1997 04 01 15 39 43 6.4 -9 672.00 -59.7 -59.4 -59.9 59 -99 SPO 1997 04 01 15 40 43 6.5 -9 672.00 -59.8 -59.4 -59.9 60 -99 SPO 1997 04 01 15 41 43 6.3 -9 672.00 -59.8 -59.5 -59.9 60 -99 SPO 1997 04 01 15 42 43 6.3 -9 672.00 -59.8 -59.5 -59.9 60 -99 SPO 1997 04 01 15 43 43 6.3 -9 672.10 -59.8 -59.5 -59.9 60 -99 SPO 1997 04 01 15 44 43 6.2 -9 672.00 -59.8 -59.5 -59.9 60 -99 SPO 1997 04 01 15 45 42 6.2 -9 672.10 -59.8 -59.5 -59.9 60 -99 SPO 1997 04 01 15 46 42 6.2 -9 672.10 -59.8 -59.5 -59.9 59 -99 SPO 1997 04 01 15 47 42 6.0 -9 672.10 -59.8 -59.5 -59.9 59 -99 SPO 1997 04 01 15 48 42 6.2 -9 672.10 -59.9 -59.5 -60.0 60 -99 SPO 1997 04 01 15 49 42 6.0 -9 672.10 -59.9 -59.5 -60.0 60 -99 SPO 1997 04 01 15 50 43 6.0 -9 672.10 -59.9 -59.5 -60.0 60 -99 SPO 1997 04 01 15 51 44 5.8 -9 672.20 -59.9 -59.5 -60.0 60 -99 SPO 1997 04 01 15 52 44 5.7 -9 672.20 -59.9 -59.6 -60.0 60 -99 SPO 1997 04 01 15 53 45 5.8 -9 672.20 -59.9 -59.6 -60.0 60 -99 SPO 1997 04 01 15 54 45 5.5 -9 672.20 -59.9 -59.6 -60.0 60 -99 SPO 1997 04 01 15 55 45 5.3 -9 672.20 -59.9 -59.6 -60.0 60 -99 SPO 1997 04 01 15 56 45 5.2 -9 672.30 -60.0 -59.7 -60.0 60 -99 SPO 1997 04 01 15 57 45 5.3 -9 672.30 -60.0 -59.7 -60.1 60 -99 SPO 1997 04 01 15 58 44 5.3 -9 672.30 -60.0 -59.7 -60.1 60 -99 SPO 1997 04 01 15 59 46 5.2 -9 672.30 -60.0 -59.8 -60.1 60 -99 SPO 1997 04 01 16 00 45 5.4 -9 672.30 -60.0 -59.8 -60.1 59 0 SPO 1997 04 01 16 01 45 5.3 -9 672.30 -60.1 -59.8 -60.2 60 -99 SPO 1997 04 01 16 02 46 5.3 -9 672.20 -60.1 -59.8 -60.2 60 -99 SPO 1997 04 01 16 03 46 5.3 -9 672.30 -60.1 -59.8 -60.2 60 -99 SPO 1997 04 01 16 04 48 5.5 -9 672.30 -60.1 -59.8 -60.2 61 -99 SPO 1997 04 01 16 05 48 5.6 -9 672.20 -60.1 -59.8 -60.2 60 -99 SPO 1997 04 01 16 06 48 5.7 -9 672.20 -60.2 -59.8 -60.3 61 -99 SPO 1997 04 01 16 07 47 5.7 -9 672.20 -60.2 -59.8 -60.3 60 -99 SPO 1997 04 01 16 08 47 5.5 -9 672.20 -60.2 -59.8 -60.3 60 -99 SPO 1997 04 01 16 09 46 5.7 -9 672.20 -60.3 -59.8 -60.4 60 -99 SPO 1997 04 01 16 10 46 5.7 -9 672.20 -60.3 -59.8 -60.4 60 -99 SPO 1997 04 01 16 11 46 5.9 -9 672.20 -60.3 -59.9 -60.4 59 -99 SPO 1997 04 01 16 12 45 6.0 -9 672.20 -60.3 -59.9 -60.4 59 -99 SPO 1997 04 01 16 13 46 6.0 -9 672.10 -60.4 -59.9 -60.4 60 -99 SPO 1997 04 01 16 14 45 6.0 -9 672.20 -60.4 -59.9 -60.4 60 -99 SPO 1997 04 01 16 15 45 6.0 -9 672.20 -60.4 -59.9 -60.5 61 -99 SPO 1997 04 01 16 16 45 5.8 -9 672.20 -60.4 -59.9 -60.5 61 -99 SPO 1997 04 01 16 17 45 5.9 -9 672.20 -60.4 -59.9 -60.5 61 -99 SPO 1997 04 01 16 18 46 5.8 -9 672.20 -60.4 -59.9 -60.6 60 -99 SPO 1997 04 01 16 19 46 5.8 -9 672.20 -60.5 -59.9 -60.6 61 -99 SPO 1997 04 01 16 20 45 5.8 -9 672.20 -60.5 -59.9 -60.6 60 -99 SPO 1997 04 01 16 21 46 5.6 -9 672.20 -60.5 -59.9 -60.6 59 -99 SPO 1997 04 01 16 22 47 5.6 -9 672.20 -60.6 -59.9 -60.6 60 -99 SPO 1997 04 01 16 23 47 5.4 -9 672.30 -60.6 -59.9 -60.6 59 -99 SPO 1997 04 01 16 24 48 5.4 -9 672.30 -60.6 -59.9 -60.6 59 -99 SPO 1997 04 01 16 25 49 5.3 -9 672.20 -60.6 -59.9 -60.6 59 -99 SPO 1997 04 01 16 26 49 5.0 -9 672.30 -60.6 -60.0 -60.7 59 -99 SPO 1997 04 01 16 27 48 5.0 -9 672.30 -60.6 -60.0 -60.7 59 -99 SPO 1997 04 01 16 28 48 5.1 -9 672.30 -60.7 -60.0 -60.8 60 -99 SPO 1997 04 01 16 29 48 5.2 -9 672.30 -60.7 -60.0 -60.7 60 -99 SPO 1997 04 01 16 30 48 5.2 -9 672.30 -60.7 -60.0 -60.8 60 -99 SPO 1997 04 01 16 31 48 5.3 -9 672.30 -60.7 -60.0 -60.8 59 -99 SPO 1997 04 01 16 32 48 5.4 -9 672.30 -60.7 -60.0 -60.8 59 -99 SPO 1997 04 01 16 33 47 5.6 -9 672.30 -60.8 -60.0 -60.8 59 -99 SPO 1997 04 01 16 34 47 5.7 -9 672.20 -60.8 -60.0 -60.8 59 -99 SPO 1997 04 01 16 35 47 5.9 -9 672.20 -60.8 -60.0 -60.9 59 -99 SPO 1997 04 01 16 36 47 5.9 -9 672.20 -60.8 -60.0 -60.9 59 -99 SPO 1997 04 01 16 37 47 6.1 -9 672.20 -60.8 -59.9 -60.9 60 -99 SPO 1997 04 01 16 38 48 5.9 -9 672.20 -60.8 -59.9 -60.9 60 -99 SPO 1997 04 01 16 39 48 5.9 -9 672.30 -60.9 -59.9 -60.9 61 -99 SPO 1997 04 01 16 40 48 5.8 -9 672.30 -60.9 -59.9 -61.0 61 -99 SPO 1997 04 01 16 41 47 5.7 -9 672.30 -60.9 -59.9 -61.0 60 -99 SPO 1997 04 01 16 42 48 5.6 -9 672.30 -60.9 -60.0 -61.0 59 -99 SPO 1997 04 01 16 43 48 5.8 -9 672.20 -60.9 -60.0 -61.0 59 -99 SPO 1997 04 01 16 44 47 6.0 -9 672.20 -61.0 -60.0 -61.0 60 -99 SPO 1997 04 01 16 45 47 6.1 -9 672.20 -61.0 -60.0 -61.0 60 -99 SPO 1997 04 01 16 46 46 6.2 -9 672.20 -61.0 -60.0 -61.1 59 -99 SPO 1997 04 01 16 47 46 6.3 -9 672.20 -61.0 -60.0 -61.0 59 -99 SPO 1997 04 01 16 48 46 6.3 -9 672.20 -61.0 -60.0 -61.1 59 -99 SPO 1997 04 01 16 49 47 6.4 -9 672.20 -61.0 -60.0 -61.1 60 -99 SPO 1997 04 01 16 50 47 6.4 -9 672.20 -61.0 -60.0 -61.1 60 -99 SPO 1997 04 01 16 51 48 6.2 -9 672.20 -61.0 -60.0 -61.1 59 -99 SPO 1997 04 01 16 52 48 6.2 -9 672.20 -61.0 -60.1 -61.1 59 -99 SPO 1997 04 01 16 53 48 6.3 -9 672.20 -61.0 -60.1 -61.1 59 -99 SPO 1997 04 01 16 54 48 6.2 -9 672.20 -61.1 -60.1 -61.1 59 -99 SPO 1997 04 01 16 55 47 6.1 -9 672.20 -61.0 -60.1 -61.2 58 -99 SPO 1997 04 01 16 56 48 6.2 -9 672.20 -61.1 -60.1 -61.2 59 -99 SPO 1997 04 01 16 57 47 6.1 -9 672.20 -61.1 -60.2 -61.2 58 -99 SPO 1997 04 01 16 58 48 6.0 -9 672.20 -61.1 -60.3 -61.2 59 -99 SPO 1997 04 01 16 59 48 5.8 -9 672.20 -61.1 -60.3 -61.2 59 -99 SPO 1997 04 01 17 00 48 5.7 -9 672.20 -61.1 -60.3 -61.2 59 0 SPO 1997 04 01 17 01 48 5.7 -9 672.20 -61.1 -60.3 -61.2 59 -99 SPO 1997 04 01 17 02 48 5.7 -9 672.20 -61.1 -60.4 -61.2 59 -99 SPO 1997 04 01 17 03 48 5.7 -9 672.20 -61.1 -60.4 -61.2 59 -99 SPO 1997 04 01 17 04 48 5.7 -9 672.20 -61.1 -60.4 -61.2 59 -99 SPO 1997 04 01 17 05 48 5.6 -9 672.20 -61.2 -60.4 -61.3 60 -99 SPO 1997 04 01 17 06 48 5.5 -9 672.30 -61.2 -60.4 -61.3 59 -99 SPO 1997 04 01 17 07 49 5.6 -9 672.30 -61.2 -60.4 -61.3 59 -99 SPO 1997 04 01 17 08 49 5.5 -9 672.20 -61.2 -60.4 -61.3 59 -99 SPO 1997 04 01 17 09 49 5.6 -9 672.30 -61.3 -60.4 -61.4 59 -99 SPO 1997 04 01 17 10 49 5.7 -9 672.30 -61.2 -60.5 -61.4 59 -99 SPO 1997 04 01 17 11 49 5.8 -9 672.30 -61.3 -60.5 -61.4 59 -99 SPO 1997 04 01 17 12 49 5.7 -9 672.30 -61.3 -60.5 -61.4 59 -99 SPO 1997 04 01 17 13 49 5.6 -9 672.30 -61.4 -60.6 -61.4 -99 -99 SPO 1997 04 01 17 14 49 5.5 -9 672.30 -61.4 -60.6 -61.5 -99 -99 SPO 1997 04 01 17 15 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 01 17 16 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 01 17 17 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 01 17 18 -999 -99.9 -9 672.30 -61.5 -60.6 -61.6 -99 -99 SPO 1997 04 01 17 19 49 5.7 -9 672.30 -61.5 -60.6 -61.6 -99 -99 SPO 1997 04 01 17 20 48 5.8 -9 672.20 -61.5 -60.6 -61.6 59 -99 SPO 1997 04 01 17 21 47 5.9 -9 672.20 -61.5 -60.6 -61.6 58 -99 SPO 1997 04 01 17 22 46 6.1 -9 672.20 -61.5 -60.6 -61.6 58 -99 SPO 1997 04 01 17 23 45 6.4 -9 672.20 -61.6 -60.5 -61.6 60 -99 SPO 1997 04 01 17 24 44 6.5 -9 672.20 -61.6 -60.5 -61.6 60 -99 SPO 1997 04 01 17 25 43 6.7 -9 672.10 -61.5 -60.4 -61.6 59 -99 SPO 1997 04 01 17 26 42 6.7 -9 672.10 -61.5 -60.4 -61.6 59 -99 SPO 1997 04 01 17 27 43 6.7 -9 672.10 -61.5 -60.4 -61.6 59 -99 SPO 1997 04 01 17 28 42 6.5 -9 672.20 -61.5 -60.4 -61.5 59 -99 SPO 1997 04 01 17 29 42 6.4 -9 672.20 -61.5 -60.4 -61.5 59 -99 SPO 1997 04 01 17 30 42 6.6 -9 672.20 -61.4 -60.4 -61.5 58 -99 SPO 1997 04 01 17 31 43 6.4 -9 672.20 -61.4 -60.4 -61.5 58 -99 SPO 1997 04 01 17 32 44 6.3 -9 672.20 -61.4 -60.5 -61.4 59 -99 SPO 1997 04 01 17 33 45 6.4 -9 672.20 -61.4 -60.5 -61.4 59 -99 SPO 1997 04 01 17 34 45 6.5 -9 672.20 -61.3 -60.5 -61.4 59 -99 SPO 1997 04 01 17 35 45 6.6 -9 672.20 -61.3 -60.5 -61.4 60 -99 SPO 1997 04 01 17 36 45 6.6 -9 672.20 -61.2 -60.5 -61.3 60 -99 SPO 1997 04 01 17 37 45 6.7 -9 672.10 -61.2 -60.4 -61.3 60 -99 SPO 1997 04 01 17 38 45 6.7 -9 672.20 -61.2 -60.4 -61.2 61 -99 SPO 1997 04 01 17 39 44 6.7 -9 672.10 -61.1 -60.4 -61.2 60 -99 SPO 1997 04 01 17 40 45 6.8 -9 672.10 -61.1 -60.4 -61.2 61 -99 SPO 1997 04 01 17 41 45 6.8 -9 672.10 -61.1 -60.4 -61.1 60 -99 SPO 1997 04 01 17 42 44 6.9 -9 672.10 -61.1 -60.4 -61.1 60 -99 SPO 1997 04 01 17 43 44 6.9 -9 672.10 -61.0 -60.4 -61.1 59 -99 SPO 1997 04 01 17 44 44 6.5 -9 672.20 -61.0 -60.4 -61.1 59 -99 SPO 1997 04 01 17 45 44 6.5 -9 672.20 -61.0 -60.5 -61.0 59 -99 SPO 1997 04 01 17 46 44 6.1 -9 672.20 -60.9 -60.5 -61.0 59 -99 SPO 1997 04 01 17 47 45 6.0 -9 672.30 -60.9 -60.5 -61.0 60 -99 SPO 1997 04 01 17 48 46 5.8 -9 672.30 -60.9 -60.6 -61.0 60 -99 SPO 1997 04 01 17 49 47 5.7 -9 672.30 -60.9 -60.5 -61.0 60 -99 SPO 1997 04 01 17 50 49 5.5 -9 672.30 -60.9 -60.5 -61.0 60 -99 SPO 1997 04 01 17 51 49 5.4 -9 672.40 -60.9 -60.5 -61.0 61 -99 SPO 1997 04 01 17 52 50 5.3 -9 672.40 -60.9 -60.5 -61.0 60 -99 SPO 1997 04 01 17 53 50 5.0 -9 672.40 -60.8 -60.5 -61.0 60 -99 SPO 1997 04 01 17 54 49 5.4 -9 672.40 -60.8 -60.5 -61.0 59 -99 SPO 1997 04 01 17 55 48 5.1 -9 672.40 -60.8 -60.5 -60.9 60 -99 SPO 1997 04 01 17 56 48 5.3 -9 672.40 -60.8 -60.4 -60.9 60 -99 SPO 1997 04 01 17 57 48 5.4 -9 672.40 -60.8 -60.4 -60.9 60 -99 SPO 1997 04 01 17 58 48 5.4 -9 672.40 -60.8 -60.4 -60.9 61 -99 SPO 1997 04 01 17 59 47 5.4 -9 672.40 -60.8 -60.4 -60.9 61 -99 SPO 1997 04 01 18 00 47 5.6 -9 672.50 -60.7 -60.5 -60.8 61 0 SPO 1997 04 01 18 01 47 5.5 -9 672.40 -60.7 -60.5 -60.8 61 -99 SPO 1997 04 01 18 02 45 5.5 -9 672.50 -60.7 -60.5 -60.8 61 -99 SPO 1997 04 01 18 03 46 5.6 -9 672.50 -60.7 -60.5 -60.8 61 -99 SPO 1997 04 01 18 04 45 5.7 -9 672.50 -60.7 -60.5 -60.8 60 -99 SPO 1997 04 01 18 05 45 5.6 -9 672.50 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 06 45 5.8 -9 672.50 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 07 45 5.9 -9 672.40 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 08 45 6.0 -9 672.50 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 09 45 6.0 -9 672.50 -60.7 -60.4 -60.7 61 -99 SPO 1997 04 01 18 10 46 5.6 -9 672.50 -60.6 -60.3 -60.8 60 -99 SPO 1997 04 01 18 11 47 5.7 -9 672.50 -60.6 -60.3 -60.7 60 -99 SPO 1997 04 01 18 12 47 5.7 -9 672.60 -60.6 -60.3 -60.7 61 -99 SPO 1997 04 01 18 13 49 5.5 -9 672.60 -60.6 -60.3 -60.7 60 -99 SPO 1997 04 01 18 14 50 5.4 -9 672.60 -60.6 -60.4 -60.7 60 -99 SPO 1997 04 01 18 15 49 5.5 -9 672.60 -60.6 -60.4 -60.8 59 -99 SPO 1997 04 01 18 16 50 5.6 -9 672.60 -60.6 -60.4 -60.8 59 -99 SPO 1997 04 01 18 17 50 5.8 -9 672.50 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 18 51 5.7 -9 672.60 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 19 50 5.6 -9 672.60 -60.7 -60.5 -60.8 59 -99 SPO 1997 04 01 18 20 51 5.5 -9 672.60 -60.7 -60.5 -60.8 59 -99 SPO 1997 04 01 18 21 51 5.3 -9 672.60 -60.7 -60.4 -60.8 60 -99 SPO 1997 04 01 18 22 52 5.5 -9 672.60 -60.7 -60.4 -60.8 61 -99 SPO 1997 04 01 18 23 52 5.4 -9 672.60 -60.7 -60.4 -60.8 61 -99 SPO 1997 04 01 18 24 51 5.6 -9 672.60 -60.7 -60.4 -60.8 61 -99 SPO 1997 04 01 18 25 50 5.7 -9 672.60 -60.7 -60.4 -60.8 61 -99 SPO 1997 04 01 18 26 50 5.7 -9 672.60 -60.8 -60.4 -60.9 61 -99 SPO 1997 04 01 18 27 49 5.6 -9 672.60 -60.8 -60.4 -60.9 60 -99 SPO 1997 04 01 18 28 49 6.1 -9 672.60 -60.8 -60.4 -60.9 60 -99 SPO 1997 04 01 18 29 48 6.0 -9 672.60 -60.8 -60.4 -60.8 59 -99 SPO 1997 04 01 18 30 48 5.7 -9 672.60 -60.8 -60.4 -60.9 59 -99 SPO 1997 04 01 18 31 47 5.5 -9 672.60 -60.8 -60.5 -60.9 59 -99 SPO 1997 04 01 18 32 47 5.8 -9 672.60 -60.8 -60.5 -60.9 60 -99 SPO 1997 04 01 18 33 47 5.7 -9 672.60 -60.8 -60.5 -60.9 59 -99 SPO 1997 04 01 18 34 46 5.6 -9 672.60 -60.8 -60.5 -60.9 60 -99 SPO 1997 04 01 18 35 46 5.7 -9 672.60 -60.8 -60.5 -60.9 60 -99 SPO 1997 04 01 18 36 46 5.8 -9 672.60 -60.8 -60.5 -60.9 60 -99 SPO 1997 04 01 18 37 45 6.0 -9 672.60 -60.9 -60.5 -60.9 61 -99 SPO 1997 04 01 18 38 45 6.0 -9 672.60 -60.8 -60.5 -60.9 59 -99 SPO 1997 04 01 18 39 46 5.9 -9 672.60 -60.9 -60.5 -61.0 59 -99 SPO 1997 04 01 18 40 45 6.1 -9 672.60 -60.9 -60.5 -61.0 59 -99 SPO 1997 04 01 18 41 45 6.1 -9 672.60 -60.9 -60.4 -60.9 60 -99 SPO 1997 04 01 18 42 45 6.3 -9 672.60 -60.9 -60.4 -60.9 60 -99 SPO 1997 04 01 18 43 44 6.2 -9 672.60 -60.9 -60.4 -61.0 60 -99 SPO 1997 04 01 18 44 44 6.1 -9 672.60 -60.9 -60.4 -60.9 61 -99 SPO 1997 04 01 18 45 44 6.0 -9 672.60 -60.9 -60.4 -60.9 61 -99 SPO 1997 04 01 18 46 43 5.8 -9 672.70 -60.9 -60.4 -60.9 61 -99 SPO 1997 04 01 18 47 44 5.6 -9 672.70 -60.9 -60.5 -60.9 61 -99 SPO 1997 04 01 18 48 44 5.3 -9 672.70 -60.9 -60.5 -60.9 61 -99 SPO 1997 04 01 18 49 45 5.5 -9 672.70 -60.9 -60.5 -60.9 61 -99 SPO 1997 04 01 18 50 45 5.5 -9 672.70 -60.9 -60.5 -60.9 60 -99 SPO 1997 04 01 18 51 45 5.5 -9 672.70 -60.9 -60.4 -60.9 60 -99 SPO 1997 04 01 18 52 46 5.5 -9 672.70 -60.9 -60.4 -60.9 59 -99 SPO 1997 04 01 18 53 45 5.5 -9 672.80 -60.9 -60.4 -60.9 59 -99 SPO 1997 04 01 18 54 45 5.5 -9 672.80 -60.8 -60.4 -60.9 59 -99 SPO 1997 04 01 18 55 46 5.5 -9 672.80 -60.9 -60.4 -60.9 61 -99 SPO 1997 04 01 18 56 46 5.5 -9 672.80 -60.9 -60.4 -60.9 62 -99 SPO 1997 04 01 18 57 46 5.6 -9 672.80 -60.9 -60.4 -60.9 62 -99 SPO 1997 04 01 18 58 47 5.8 -9 672.80 -60.9 -60.4 -60.9 62 -99 SPO 1997 04 01 18 59 47 6.0 -9 672.80 -60.9 -60.3 -60.9 61 -99 SPO 1997 04 01 19 00 46 6.2 -9 672.70 -60.9 -60.3 -60.9 61 0 SPO 1997 04 01 19 01 46 6.3 -9 672.70 -60.8 -60.4 -60.9 59 -99 SPO 1997 04 01 19 02 47 6.3 -9 672.70 -60.9 -60.4 -60.9 60 -99 SPO 1997 04 01 19 03 47 6.3 -9 672.70 -60.9 -60.4 -61.0 59 -99 SPO 1997 04 01 19 04 46 6.1 -9 672.70 -60.9 -60.4 -61.0 59 -99 SPO 1997 04 01 19 05 46 6.2 -9 672.80 -60.9 -60.4 -61.0 59 -99 SPO 1997 04 01 19 06 47 6.0 -9 672.80 -60.9 -60.3 -61.0 60 -99 SPO 1997 04 01 19 07 47 5.8 -9 672.80 -60.9 -60.3 -61.0 60 -99 SPO 1997 04 01 19 08 48 5.8 -9 672.80 -60.9 -60.4 -61.0 61 -99 SPO 1997 04 01 19 09 48 5.7 -9 672.80 -60.9 -60.3 -61.0 60 -99 SPO 1997 04 01 19 10 49 5.8 -9 672.80 -60.9 -60.3 -61.0 60 -99 SPO 1997 04 01 19 11 50 5.8 -9 672.80 -61.0 -60.3 -61.1 60 -99 SPO 1997 04 01 19 12 50 5.8 -9 672.80 -61.0 -60.3 -61.0 60 -99 SPO 1997 04 01 19 13 50 5.8 -9 672.80 -61.0 -60.3 -61.1 60 -99 SPO 1997 04 01 19 14 51 5.6 -9 672.90 -61.0 -60.3 -61.1 60 -99 SPO 1997 04 01 19 15 52 5.5 -9 672.90 -61.0 -60.2 -61.1 59 -99 SPO 1997 04 01 19 16 52 5.4 -9 672.90 -61.0 -60.3 -61.1 59 -99 SPO 1997 04 01 19 17 53 5.3 -9 672.90 -61.0 -60.3 -61.1 60 -99 SPO 1997 04 01 19 18 53 5.4 -9 672.90 -61.1 -60.4 -61.2 61 -99 SPO 1997 04 01 19 19 53 5.4 -9 672.90 -61.1 -60.4 -61.2 61 -99 SPO 1997 04 01 19 20 53 5.4 -9 672.90 -61.1 -60.4 -61.2 60 -99 SPO 1997 04 01 19 21 53 5.4 -9 672.90 -61.1 -60.4 -61.2 60 -99 SPO 1997 04 01 19 22 53 5.4 -9 672.90 -61.2 -60.4 -61.3 60 -99 SPO 1997 04 01 19 23 52 5.4 -9 672.90 -61.2 -60.3 -61.3 60 -99 SPO 1997 04 01 19 24 52 5.3 -9 672.90 -61.2 -60.3 -61.3 59 -99 SPO 1997 04 01 19 25 53 5.3 -9 672.80 -61.2 -60.3 -61.3 59 -99 SPO 1997 04 01 19 26 53 5.3 -9 672.80 -61.3 -60.3 -61.4 59 -99 SPO 1997 04 01 19 27 53 5.3 -9 672.80 -61.3 -60.3 -61.4 59 -99 SPO 1997 04 01 19 28 52 5.2 -9 672.90 -61.3 -60.3 -61.4 59 -99 SPO 1997 04 01 19 29 51 5.1 -9 672.80 -61.3 -60.3 -61.4 59 -99 SPO 1997 04 01 19 30 50 5.1 -9 672.90 -61.4 -60.4 -61.4 59 -99 SPO 1997 04 01 19 31 50 5.1 -9 672.90 -61.4 -60.4 -61.4 60 -99 SPO 1997 04 01 19 32 50 5.0 -9 672.90 -61.4 -60.4 -61.4 60 -99 SPO 1997 04 01 19 33 50 5.0 -9 672.90 -61.4 -60.4 -61.4 60 -99 SPO 1997 04 01 19 34 50 4.7 -9 672.90 -61.4 -60.4 -61.5 59 -99 SPO 1997 04 01 19 35 51 4.5 -9 672.90 -61.4 -60.4 -61.5 58 -99 SPO 1997 04 01 19 36 51 4.4 -9 672.90 -61.4 -60.5 -61.5 62 -99 SPO 1997 04 01 19 37 51 4.3 -9 672.90 -61.4 -60.5 -61.5 65 -99 SPO 1997 04 01 19 38 50 4.5 -9 672.90 -61.4 -60.5 -61.5 65 -99 SPO 1997 04 01 19 39 50 4.8 -9 672.90 -61.4 -60.4 -61.5 65 -99 SPO 1997 04 01 19 40 50 5.0 -9 672.90 -61.5 -60.4 -61.5 66 -99 SPO 1997 04 01 19 41 49 5.1 -9 672.90 -61.5 -60.4 -61.5 66 -99 SPO 1997 04 01 19 42 48 5.1 -9 672.90 -61.4 -60.3 -61.5 65 -99 SPO 1997 04 01 19 43 48 4.8 -9 672.90 -61.4 -60.3 -61.6 65 -99 SPO 1997 04 01 19 44 49 4.7 -9 673.00 -61.5 -60.4 -61.5 66 -99 SPO 1997 04 01 19 45 50 4.6 -9 673.00 -61.4 -60.4 -61.6 63 -99 SPO 1997 04 01 19 46 51 4.7 -9 673.00 -61.5 -60.4 -61.6 63 -99 SPO 1997 04 01 19 47 51 4.9 -9 672.90 -61.5 -60.5 -61.6 63 -99 SPO 1997 04 01 19 48 51 5.2 -9 672.90 -61.5 -60.5 -61.6 62 -99 SPO 1997 04 01 19 49 50 5.4 -9 672.90 -61.5 -60.4 -61.6 62 -99 SPO 1997 04 01 19 50 49 5.6 -9 672.90 -61.5 -60.4 -61.6 62 -99 SPO 1997 04 01 19 51 49 5.5 -9 672.90 -61.6 -60.4 -61.6 62 -99 SPO 1997 04 01 19 52 49 5.5 -9 672.90 -61.6 -60.4 -61.6 62 -99 SPO 1997 04 01 19 53 49 5.4 -9 672.90 -61.6 -60.4 -61.6 62 -99 SPO 1997 04 01 19 54 51 5.5 -9 672.90 -61.6 -60.3 -61.6 62 -99 SPO 1997 04 01 19 55 51 5.4 -9 672.90 -61.6 -60.3 -61.7 63 -99 SPO 1997 04 01 19 56 51 5.5 -9 672.90 -61.6 -60.3 -61.7 62 -99 SPO 1997 04 01 19 57 51 5.7 -9 672.90 -61.5 -60.3 -61.7 62 -99 SPO 1997 04 01 19 58 51 5.8 -9 672.90 -61.6 -60.2 -61.7 62 -99 SPO 1997 04 01 19 59 50 5.7 -9 672.90 -61.6 -60.2 -61.7 62 -99 SPO 1997 04 01 20 00 50 5.7 -9 672.90 -61.6 -60.3 -61.7 61 0 SPO 1997 04 01 20 01 50 5.8 -9 672.90 -61.6 -60.3 -61.7 60 -99 SPO 1997 04 01 20 02 50 5.9 -9 672.90 -61.6 -60.3 -61.7 61 -99 SPO 1997 04 01 20 03 50 5.9 -9 672.80 -61.7 -60.3 -61.8 62 -99 SPO 1997 04 01 20 04 50 6.1 -9 672.80 -61.7 -60.4 -61.8 62 -99 SPO 1997 04 01 20 05 50 6.1 -9 672.80 -61.7 -60.4 -61.8 62 -99 SPO 1997 04 01 20 06 50 6.2 -9 672.80 -61.7 -60.4 -61.8 62 -99 SPO 1997 04 01 20 07 50 6.3 -9 672.80 -61.7 -60.4 -61.8 62 -99 SPO 1997 04 01 20 08 49 6.3 -9 672.80 -61.8 -60.4 -61.8 62 -99 SPO 1997 04 01 20 09 49 6.4 -9 672.80 -61.8 -60.4 -61.8 62 -99 SPO 1997 04 01 20 10 50 6.4 -9 672.80 -61.8 -60.4 -61.8 62 -99 SPO 1997 04 01 20 11 50 6.3 -9 672.80 -61.7 -60.4 -61.8 60 -99 SPO 1997 04 01 20 12 51 6.1 -9 672.80 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 20 13 52 5.9 -9 672.90 -61.8 -60.4 -61.9 61 -99 SPO 1997 04 01 20 14 52 5.7 -9 672.80 -61.8 -60.5 -61.9 61 -99 SPO 1997 04 01 20 15 53 5.8 -9 672.90 -61.8 -60.5 -61.9 61 -99 SPO 1997 04 01 20 16 53 5.7 -9 672.90 -61.8 -60.6 -61.9 61 -99 SPO 1997 04 01 20 17 54 5.7 -9 672.80 -61.9 -60.6 -61.9 61 -99 SPO 1997 04 01 20 18 54 5.8 -9 672.80 -61.9 -60.6 -62.0 61 -99 SPO 1997 04 01 20 19 54 5.8 -9 672.80 -61.9 -60.7 -62.0 61 -99 SPO 1997 04 01 20 20 53 5.9 -9 672.80 -62.0 -60.7 -62.0 61 -99 SPO 1997 04 01 20 21 53 6.0 -9 672.80 -62.0 -60.6 -62.1 61 -99 SPO 1997 04 01 20 22 52 6.0 -9 672.80 -62.0 -60.6 -62.1 61 -99 SPO 1997 04 01 20 23 51 6.2 -9 672.80 -62.0 -60.6 -62.1 60 -99 SPO 1997 04 01 20 24 51 6.2 -9 672.70 -62.0 -60.6 -62.1 60 -99 SPO 1997 04 01 20 25 51 6.4 -9 672.70 -62.0 -60.5 -62.1 61 -99 SPO 1997 04 01 20 26 51 6.4 -9 672.70 -62.0 -60.5 -62.1 61 -99 SPO 1997 04 01 20 27 51 6.3 -9 672.70 -62.0 -60.5 -62.2 61 -99 SPO 1997 04 01 20 28 52 6.3 -9 672.70 -62.0 -60.5 -62.2 61 -99 SPO 1997 04 01 20 29 52 6.3 -9 672.70 -62.1 -60.5 -62.2 61 -99 SPO 1997 04 01 20 30 52 6.3 -9 672.70 -62.1 -60.5 -62.2 61 -99 SPO 1997 04 01 20 31 51 6.3 -9 672.70 -62.1 -60.6 -62.2 60 -99 SPO 1997 04 01 20 32 51 6.2 -9 672.70 -62.2 -60.6 -62.2 60 -99 SPO 1997 04 01 20 33 51 6.2 -9 672.70 -62.2 -60.6 -62.2 60 -99 SPO 1997 04 01 20 34 51 6.1 -9 672.70 -62.2 -60.6 -62.3 60 -99 SPO 1997 04 01 20 35 51 6.2 -9 672.70 -62.2 -60.6 -62.3 60 -99 SPO 1997 04 01 20 36 51 6.0 -9 672.70 -62.2 -60.7 -62.3 60 -99 SPO 1997 04 01 20 37 51 5.9 -9 672.70 -62.2 -60.7 -62.3 60 -99 SPO 1997 04 01 20 38 51 6.1 -9 672.70 -62.3 -60.7 -62.3 61 -99 SPO 1997 04 01 20 39 51 6.2 -9 672.60 -62.2 -60.7 -62.3 61 -99 SPO 1997 04 01 20 40 50 6.2 -9 672.60 -62.2 -60.7 -62.3 61 -99 SPO 1997 04 01 20 41 50 6.3 -9 672.60 -62.2 -60.7 -62.3 61 -99 SPO 1997 04 01 20 42 49 6.2 -9 672.60 -62.2 -60.7 -62.3 61 -99 SPO 1997 04 01 20 43 49 6.3 -9 672.60 -62.2 -60.7 -62.3 60 -99 SPO 1997 04 01 20 44 48 6.3 -9 672.60 -62.2 -60.7 -62.3 60 -99 SPO 1997 04 01 20 45 48 6.1 -9 672.60 -62.2 -60.7 -62.3 60 -99 SPO 1997 04 01 20 46 49 5.9 -9 672.60 -62.2 -60.7 -62.3 60 -99 SPO 1997 04 01 20 47 49 5.8 -9 672.70 -62.2 -60.8 -62.3 60 -99 SPO 1997 04 01 20 48 50 5.8 -9 672.70 -62.3 -60.8 -62.3 61 -99 SPO 1997 04 01 20 49 50 5.6 -9 672.70 -62.3 -60.9 -62.3 61 -99 SPO 1997 04 01 20 50 50 5.6 -9 672.70 -62.2 -60.9 -62.3 61 -99 SPO 1997 04 01 20 51 50 5.7 -9 672.70 -62.2 -60.9 -62.3 61 -99 SPO 1997 04 01 20 52 50 5.9 -9 672.70 -62.2 -60.9 -62.3 61 -99 SPO 1997 04 01 20 53 49 5.8 -9 672.70 -62.3 -60.9 -62.3 62 -99 SPO 1997 04 01 20 54 49 5.9 -9 672.70 -62.2 -60.9 -62.3 60 -99 SPO 1997 04 01 20 55 48 5.9 -9 672.70 -62.2 -60.9 -62.3 60 -99 SPO 1997 04 01 20 56 48 6.1 -9 672.70 -62.2 -60.8 -62.3 58 -99 SPO 1997 04 01 20 57 48 6.0 -9 672.70 -62.2 -60.8 -62.3 60 -99 SPO 1997 04 01 20 58 47 5.9 -9 672.70 -62.2 -60.8 -62.3 58 -99 SPO 1997 04 01 20 59 46 5.9 -9 672.70 -62.2 -60.8 -62.3 60 -99 SPO 1997 04 01 21 00 47 6.0 -9 672.80 -62.2 -60.8 -62.3 60 0 SPO 1997 04 01 21 01 46 5.7 -9 672.80 -62.1 -60.8 -62.2 59 -99 SPO 1997 04 01 21 02 46 5.8 -9 672.80 -62.2 -60.9 -62.3 60 -99 SPO 1997 04 01 21 03 45 5.8 -9 672.80 -62.2 -60.9 -62.3 60 -99 SPO 1997 04 01 21 04 46 5.7 -9 672.80 -62.2 -60.9 -62.3 61 -99 SPO 1997 04 01 21 05 45 5.8 -9 672.80 -62.2 -60.8 -62.3 60 -99 SPO 1997 04 01 21 06 46 5.8 -9 672.90 -62.2 -60.8 -62.3 60 -99 SPO 1997 04 01 21 07 44 5.6 -9 672.90 -62.2 -60.8 -62.2 60 -99 SPO 1997 04 01 21 08 45 5.4 -9 672.90 -62.2 -60.8 -62.2 60 -99 SPO 1997 04 01 21 09 46 5.3 -9 672.90 -62.1 -60.8 -62.2 60 -99 SPO 1997 04 01 21 10 46 5.2 -9 672.90 -62.0 -60.8 -62.2 59 -99 SPO 1997 04 01 21 11 47 5.0 -9 673.00 -62.0 -60.8 -62.2 60 -99 SPO 1997 04 01 21 12 48 4.6 -9 673.00 -62.1 -60.9 -62.2 61 -99 SPO 1997 04 01 21 13 49 4.6 -9 673.00 -62.1 -60.9 -62.2 61 -99 SPO 1997 04 01 21 14 49 4.4 -9 673.10 -62.1 -60.9 -62.2 61 -99 SPO 1997 04 01 21 15 49 4.3 -9 673.10 -62.1 -60.9 -62.2 61 -99 SPO 1997 04 01 21 16 49 4.5 -9 673.10 -62.1 -60.9 -62.2 60 -99 SPO 1997 04 01 21 17 48 4.6 -9 673.10 -62.1 -61.0 -62.2 59 -99 SPO 1997 04 01 21 18 49 4.7 -9 673.10 -62.1 -61.0 -62.2 59 -99 SPO 1997 04 01 21 19 48 4.8 -9 673.10 -62.2 -61.0 -62.2 58 -99 SPO 1997 04 01 21 20 48 4.9 -9 673.10 -62.2 -61.0 -62.2 60 -99 SPO 1997 04 01 21 21 48 5.0 -9 673.10 -62.1 -60.9 -62.2 59 -99 SPO 1997 04 01 21 22 49 5.1 -9 673.10 -62.1 -60.9 -62.2 60 -99 SPO 1997 04 01 21 23 48 5.2 -9 673.10 -62.2 -60.8 -62.2 61 -99 SPO 1997 04 01 21 24 48 5.3 -9 673.10 -62.2 -60.8 -62.2 61 -99 SPO 1997 04 01 21 25 48 5.3 -9 673.10 -62.1 -60.8 -62.2 60 -99 SPO 1997 04 01 21 26 49 5.3 -9 673.10 -62.1 -60.8 -62.3 60 -99 SPO 1997 04 01 21 27 49 5.4 -9 673.10 -62.2 -60.8 -62.3 60 -99 SPO 1997 04 01 21 28 50 5.5 -9 673.10 -62.2 -60.8 -62.3 58 -99 SPO 1997 04 01 21 29 49 5.6 -9 673.10 -62.2 -60.8 -62.4 58 -99 SPO 1997 04 01 21 30 49 5.7 -9 673.10 -62.2 -60.7 -62.4 57 -99 SPO 1997 04 01 21 31 48 5.8 -9 673.10 -62.2 -60.8 -62.3 57 -99 SPO 1997 04 01 21 32 48 5.8 -9 673.00 -62.2 -60.8 -62.4 57 -99 SPO 1997 04 01 21 33 48 5.9 -9 673.00 -62.3 -60.8 -62.4 58 -99 SPO 1997 04 01 21 34 47 6.0 -9 673.00 -62.3 -60.8 -62.4 58 -99 SPO 1997 04 01 21 35 47 5.9 -9 673.00 -62.3 -60.8 -62.4 59 -99 SPO 1997 04 01 21 36 47 5.8 -9 673.00 -62.3 -60.8 -62.4 59 -99 SPO 1997 04 01 21 37 47 5.9 -9 673.00 -62.3 -60.8 -62.4 59 -99 SPO 1997 04 01 21 38 48 5.7 -9 673.10 -62.3 -60.7 -62.4 59 -99 SPO 1997 04 01 21 39 49 5.5 -9 673.10 -62.3 -60.8 -62.4 59 -99 SPO 1997 04 01 21 40 50 5.3 -9 673.10 -62.3 -60.8 -62.4 58 -99 SPO 1997 04 01 21 41 51 5.2 -9 673.10 -62.3 -60.8 -62.4 58 -99 SPO 1997 04 01 21 42 52 4.9 -9 673.20 -62.3 -60.8 -62.4 58 -99 SPO 1997 04 01 21 43 54 4.6 -9 673.20 -62.4 -60.8 -62.5 58 -99 SPO 1997 04 01 21 44 55 4.5 -9 673.20 -62.4 -60.9 -62.5 58 -99 SPO 1997 04 01 21 45 55 4.6 -9 673.20 -62.5 -60.9 -62.6 59 -99 SPO 1997 04 01 21 46 54 4.8 -9 673.20 -62.6 -60.9 -62.6 59 -99 SPO 1997 04 01 21 47 54 4.8 -9 673.20 -62.6 -61.0 -62.7 59 -99 SPO 1997 04 01 21 48 55 4.7 -9 673.20 -62.6 -61.0 -62.8 59 -99 SPO 1997 04 01 21 49 55 4.4 -9 673.20 -62.8 -61.1 -62.8 60 -99 SPO 1997 04 01 21 50 56 4.5 -9 673.20 -62.9 -61.1 -62.9 59 -99 SPO 1997 04 01 21 51 57 4.5 -9 673.30 -63.0 -61.1 -63.0 59 -99 SPO 1997 04 01 21 52 57 4.4 -9 673.30 -63.1 -61.1 -63.1 58 -99 SPO 1997 04 01 21 53 57 4.6 -9 673.30 -63.2 -61.1 -63.2 58 -99 SPO 1997 04 01 21 54 55 4.7 -9 673.30 -63.2 -61.0 -63.2 57 -99 SPO 1997 04 01 21 55 55 4.8 -9 673.30 -63.3 -61.0 -63.3 57 -99 SPO 1997 04 01 21 56 54 4.8 -9 673.20 -63.4 -61.0 -63.3 58 -99 SPO 1997 04 01 21 57 54 5.0 -9 673.20 -63.4 -61.0 -63.4 57 -99 SPO 1997 04 01 21 58 54 5.0 -9 673.30 -63.5 -61.0 -63.5 57 -99 SPO 1997 04 01 21 59 55 4.8 -9 673.30 -63.6 -61.0 -63.5 58 -99 SPO 1997 04 01 22 00 56 4.8 -9 673.30 -63.6 -61.0 -63.6 57 0 SPO 1997 04 01 22 01 56 4.7 -9 673.30 -63.7 -61.1 -63.7 56 -99 SPO 1997 04 01 22 02 56 4.7 -9 673.30 -63.8 -61.1 -63.7 57 -99 SPO 1997 04 01 22 03 57 4.6 -9 673.30 -63.8 -61.2 -63.8 56 -99 SPO 1997 04 01 22 04 57 4.7 -9 673.30 -63.9 -61.2 -63.8 56 -99 SPO 1997 04 01 22 05 57 4.9 -9 673.30 -64.0 -61.2 -63.9 57 -99 SPO 1997 04 01 22 06 57 4.9 -9 673.30 -64.0 -61.2 -63.9 56 -99 SPO 1997 04 01 22 07 57 4.9 -9 673.30 -64.0 -61.2 -64.0 56 -99 SPO 1997 04 01 22 08 58 5.0 -9 673.30 -64.0 -61.2 -64.0 56 -99 SPO 1997 04 01 22 09 58 5.0 -9 673.30 -64.0 -61.1 -64.0 56 -99 SPO 1997 04 01 22 10 57 5.2 -9 673.30 -64.0 -61.1 -64.0 56 -99 SPO 1997 04 01 22 11 57 5.3 -9 673.30 -64.1 -61.1 -64.0 57 -99 SPO 1997 04 01 22 12 56 5.3 -9 673.30 -64.0 -61.1 -64.0 56 -99 SPO 1997 04 01 22 13 56 5.2 -9 673.30 -64.0 -61.1 -64.0 56 -99 SPO 1997 04 01 22 14 57 5.2 -9 673.30 -64.0 -61.1 -64.0 56 -99 SPO 1997 04 01 22 15 58 5.1 -9 673.30 -63.9 -61.1 -63.9 54 -99 SPO 1997 04 01 22 16 59 5.0 -9 673.30 -63.9 -61.1 -63.9 54 -99 SPO 1997 04 01 22 17 60 5.0 -9 673.30 -63.9 -61.2 -64.0 55 -99 SPO 1997 04 01 22 18 60 4.9 -9 673.30 -63.9 -61.2 -64.0 56 -99 SPO 1997 04 01 22 19 58 5.0 -9 673.30 -63.9 -61.2 -64.0 56 -99 SPO 1997 04 01 22 20 56 5.1 -9 673.30 -64.0 -61.2 -64.0 57 -99 SPO 1997 04 01 22 21 55 5.3 -9 673.30 -64.0 -61.1 -64.0 58 -99 SPO 1997 04 01 22 22 56 5.2 -9 673.30 -64.0 -61.1 -64.1 58 -99 SPO 1997 04 01 22 23 57 5.2 -9 673.30 -64.0 -61.1 -64.1 58 -99 SPO 1997 04 01 22 24 57 5.2 -9 673.30 -64.0 -61.1 -64.1 58 -99 SPO 1997 04 01 22 25 58 5.2 -9 673.30 -64.0 -61.0 -64.1 57 -99 SPO 1997 04 01 22 26 57 5.3 -9 673.30 -64.1 -61.0 -64.1 58 -99 SPO 1997 04 01 22 27 56 5.6 -9 673.30 -64.1 -61.0 -64.2 57 -99 SPO 1997 04 01 22 28 55 5.8 -9 673.30 -64.1 -60.9 -64.2 56 -99 SPO 1997 04 01 22 29 54 6.0 -9 673.30 -64.1 -60.9 -64.2 56 -99 SPO 1997 04 01 22 30 53 6.2 -9 673.30 -64.1 -60.8 -64.2 56 -99 SPO 1997 04 01 22 31 53 6.2 -9 673.20 -64.1 -60.8 -64.1 57 -99 SPO 1997 04 01 22 32 53 6.3 -9 673.20 -64.1 -60.8 -64.1 58 -99 SPO 1997 04 01 22 33 53 6.4 -9 673.20 -64.1 -60.9 -64.1 58 -99 SPO 1997 04 01 22 34 53 6.5 -9 673.20 -64.1 -60.8 -64.1 58 -99 SPO 1997 04 01 22 35 53 6.5 -9 673.20 -64.0 -60.8 -64.1 58 -99 SPO 1997 04 01 22 36 53 6.4 -9 673.20 -64.0 -60.8 -64.1 57 -99 SPO 1997 04 01 22 37 53 6.4 -9 673.20 -64.0 -60.8 -64.1 57 -99 SPO 1997 04 01 22 38 53 6.4 -9 673.20 -64.0 -60.8 -64.1 57 -99 SPO 1997 04 01 22 39 53 6.3 -9 673.20 -64.0 -60.8 -64.1 57 -99 SPO 1997 04 01 22 40 53 6.3 -9 673.20 -64.0 -60.7 -64.1 57 -99 SPO 1997 04 01 22 41 53 6.3 -9 673.20 -63.9 -60.7 -64.1 57 -99 SPO 1997 04 01 22 42 53 6.4 -9 673.20 -63.9 -60.7 -64.1 58 -99 SPO 1997 04 01 22 43 53 6.5 -9 673.20 -64.0 -60.7 -64.1 59 -99 SPO 1997 04 01 22 44 53 6.6 -9 673.20 -64.0 -60.7 -64.1 59 -99 SPO 1997 04 01 22 45 52 6.8 -9 673.20 -64.0 -60.7 -64.1 59 -99 SPO 1997 04 01 22 46 52 6.9 -9 673.20 -63.9 -60.7 -64.1 58 -99 SPO 1997 04 01 22 47 51 7.0 -9 673.10 -64.0 -60.8 -64.1 59 -99 SPO 1997 04 01 22 48 49 7.2 -9 673.10 -64.0 -60.8 -64.1 59 -99 SPO 1997 04 01 22 49 49 7.2 -9 673.10 -64.0 -60.8 -64.1 58 -99 SPO 1997 04 01 22 50 48 7.2 -9 673.10 -64.0 -60.8 -64.0 58 -99 SPO 1997 04 01 22 51 49 7.1 -9 673.10 -64.0 -60.8 -64.0 58 -99 SPO 1997 04 01 22 52 49 7.0 -9 673.10 -63.9 -60.8 -64.0 57 -99 SPO 1997 04 01 22 53 48 6.9 -9 673.10 -63.9 -60.7 -64.0 58 -99 SPO 1997 04 01 22 54 48 6.9 -9 673.10 -63.9 -60.7 -64.1 58 -99 SPO 1997 04 01 22 55 48 6.9 -9 673.10 -63.9 -60.7 -64.1 58 -99 SPO 1997 04 01 22 56 47 7.0 -9 673.10 -64.0 -60.7 -64.1 59 -99 SPO 1997 04 01 22 57 47 7.0 -9 673.10 -64.0 -60.7 -64.1 59 -99 SPO 1997 04 01 22 58 47 7.1 -9 673.10 -64.0 -60.7 -64.1 59 -99 SPO 1997 04 01 22 59 47 7.1 -9 673.00 -64.1 -60.6 -64.1 58 -99 SPO 1997 04 01 23 00 47 7.2 -9 673.00 -64.0 -60.6 -64.1 57 0 SPO 1997 04 01 23 01 46 7.3 -9 673.00 -64.0 -60.7 -64.1 56 -99 SPO 1997 04 01 23 02 47 7.3 -9 673.00 -64.0 -60.7 -64.1 56 -99 SPO 1997 04 01 23 03 47 7.5 -9 673.00 -64.0 -60.7 -64.1 57 -99 SPO 1997 04 01 23 04 47 7.5 -9 673.00 -64.0 -60.7 -64.0 58 -99 SPO 1997 04 01 23 05 48 7.4 -9 673.00 -63.9 -60.7 -64.0 58 -99 SPO 1997 04 01 23 06 48 7.3 -9 673.00 -63.9 -60.7 -64.0 59 -99 SPO 1997 04 01 23 07 49 7.0 -9 673.00 -63.9 -60.7 -64.0 59 -99 SPO 1997 04 01 23 08 49 6.9 -9 673.10 -63.8 -60.8 -64.0 59 -99 SPO 1997 04 01 23 09 48 6.9 -9 673.10 -63.8 -60.8 -63.9 59 -99 SPO 1997 04 01 23 10 49 6.9 -9 673.00 -63.8 -60.8 -63.9 59 -99 SPO 1997 04 01 23 11 48 6.9 -9 673.10 -63.8 -60.8 -63.9 59 -99 SPO 1997 04 01 23 12 48 6.7 -9 673.10 -63.8 -60.9 -63.9 59 -99 SPO 1997 04 01 23 13 48 6.6 -9 673.10 -63.7 -61.0 -63.8 58 -99 SPO 1997 04 01 23 14 47 6.4 -9 673.10 -63.7 -61.0 -63.8 57 -99 SPO 1997 04 01 23 15 47 6.2 -9 673.10 -63.7 -61.1 -63.8 57 -99 SPO 1997 04 01 23 16 47 6.0 -9 673.10 -63.7 -61.2 -63.8 58 -99 SPO 1997 04 01 23 17 48 5.8 -9 673.20 -63.6 -61.4 -63.8 58 -99 SPO 1997 04 01 23 18 48 5.7 -9 673.20 -63.6 -61.4 -63.7 59 -99 SPO 1997 04 01 23 19 49 5.8 -9 673.20 -63.6 -61.5 -63.7 59 -99 SPO 1997 04 01 23 20 49 5.7 -9 673.20 -63.6 -61.5 -63.7 60 -99 SPO 1997 04 01 23 21 49 5.4 -9 673.20 -63.6 -61.6 -63.7 60 -99 SPO 1997 04 01 23 22 50 5.3 -9 673.20 -63.6 -61.6 -63.7 59 -99 SPO 1997 04 01 23 23 50 4.9 -9 673.20 -63.6 -61.6 -63.7 59 -99 SPO 1997 04 01 23 24 52 4.8 -9 673.30 -63.6 -61.6 -63.7 59 -99 SPO 1997 04 01 23 25 52 4.4 -9 673.30 -63.6 -61.7 -63.7 58 -99 SPO 1997 04 01 23 26 53 4.5 -9 673.30 -63.6 -61.7 -63.8 58 -99 SPO 1997 04 01 23 27 52 4.3 -9 673.30 -63.6 -61.7 -63.8 58 -99 SPO 1997 04 01 23 28 52 4.5 -9 673.30 -63.7 -61.7 -63.8 58 -99 SPO 1997 04 01 23 29 51 4.7 -9 673.30 -63.7 -61.6 -63.9 58 -99 SPO 1997 04 01 23 30 49 4.7 -9 673.30 -63.7 -61.6 -63.8 58 -99 SPO 1997 04 01 23 31 47 4.9 -9 673.30 -63.7 -61.7 -63.8 59 -99 SPO 1997 04 01 23 32 47 4.8 -9 673.30 -63.7 -61.6 -63.8 59 -99 SPO 1997 04 01 23 33 46 4.9 -9 673.30 -63.7 -61.6 -63.8 59 -99 SPO 1997 04 01 23 34 46 5.0 -9 673.30 -63.7 -61.6 -63.8 58 -99 SPO 1997 04 01 23 35 45 5.3 -9 673.30 -63.7 -61.6 -63.7 58 -99 SPO 1997 04 01 23 36 45 5.5 -9 673.30 -63.6 -61.5 -63.7 57 -99 SPO 1997 04 01 23 37 44 5.8 -9 673.20 -63.6 -61.5 -63.7 58 -99 SPO 1997 04 01 23 38 43 6.2 -9 673.20 -63.6 -61.4 -63.6 59 -99 SPO 1997 04 01 23 39 42 6.3 -9 673.20 -63.5 -61.3 -63.5 59 -99 SPO 1997 04 01 23 40 41 6.6 -9 673.20 -63.4 -61.3 -63.4 59 -99 SPO 1997 04 01 23 41 42 6.7 -9 673.20 -63.3 -61.2 -63.3 60 -99 SPO 1997 04 01 23 42 41 6.7 -9 673.10 -63.2 -61.2 -63.3 60 -99 SPO 1997 04 01 23 43 41 6.9 -9 673.10 -63.2 -61.1 -63.2 60 -99 SPO 1997 04 01 23 44 41 6.9 -9 673.10 -63.1 -61.1 -63.2 60 -99 SPO 1997 04 01 23 45 41 6.8 -9 673.10 -63.0 -61.1 -63.1 60 -99 SPO 1997 04 01 23 46 41 6.9 -9 673.20 -63.0 -61.1 -63.1 60 -99 SPO 1997 04 01 23 47 42 6.6 -9 673.20 -62.9 -61.1 -63.0 59 -99 SPO 1997 04 01 23 48 42 6.3 -9 673.20 -62.8 -61.1 -63.0 58 -99 SPO 1997 04 01 23 49 42 6.1 -9 673.30 -62.8 -61.2 -62.9 58 -99 SPO 1997 04 01 23 50 42 5.8 -9 673.30 -62.7 -61.2 -62.9 58 -99 SPO 1997 04 01 23 51 42 5.9 -9 673.30 -62.7 -61.2 -62.9 59 -99 SPO 1997 04 01 23 52 42 5.9 -9 673.30 -62.7 -61.2 -62.9 60 -99 SPO 1997 04 01 23 53 42 5.9 -9 673.30 -62.7 -61.2 -62.9 60 -99 SPO 1997 04 01 23 54 42 6.1 -9 673.30 -62.7 -61.2 -62.9 61 -99 SPO 1997 04 01 23 55 43 6.1 -9 673.30 -62.7 -61.2 -62.8 61 -99 SPO 1997 04 01 23 56 44 6.1 -9 673.30 -62.7 -61.2 -62.8 60 -99 SPO 1997 04 01 23 57 43 6.0 -9 673.30 -62.7 -61.2 -62.9 60 -99 SPO 1997 04 01 23 58 44 6.1 -9 673.30 -62.7 -61.2 -62.8 -99 -99 SPO 1997 04 01 23 59 44 6.0 -9 673.30 -62.7 -61.2 -62.8 -99 -99 SPO 1997 04 02 00 00 44 5.7 -9 673.30 -62.7 -61.3 -62.8 -99 0 SPO 1997 04 02 00 01 45 5.7 -9 673.40 -62.7 -61.3 -62.9 -99 -99 SPO 1997 04 02 00 02 45 5.3 -9 673.40 -62.8 -61.4 -62.9 -99 -99 SPO 1997 04 02 00 03 46 5.0 -9 673.40 -62.8 -61.4 -62.9 -99 -99 SPO 1997 04 02 00 04 46 4.8 -9 673.40 -62.8 -61.4 -62.9 -99 -99 SPO 1997 04 02 00 05 46 4.5 -9 673.50 -62.7 -61.4 -62.9 -99 -99 SPO 1997 04 02 00 06 47 4.5 -9 673.50 -62.8 -61.5 -62.9 -99 -99 SPO 1997 04 02 00 07 46 4.5 -9 673.50 -62.8 -61.5 -62.9 -99 -99 SPO 1997 04 02 00 08 46 4.7 -9 673.50 -62.8 -61.4 -63.0 -99 -99 SPO 1997 04 02 00 09 45 4.8 -9 673.50 -62.8 -61.5 -63.0 -99 -99 SPO 1997 04 02 00 10 45 5.0 -9 673.40 -62.9 -61.4 -63.0 -99 -99 SPO 1997 04 02 00 11 44 5.2 -9 673.40 -62.9 -61.4 -63.0 -99 -99 SPO 1997 04 02 00 12 43 5.1 -9 673.40 -63.0 -61.4 -63.1 -99 -99 SPO 1997 04 02 00 13 42 5.1 -9 673.40 -63.0 -61.4 -63.1 58 -99 SPO 1997 04 02 00 14 42 5.2 -9 673.50 -63.0 -61.4 -63.1 58 -99 SPO 1997 04 02 00 15 42 5.1 -9 673.50 -63.0 -61.4 -63.1 59 -99 SPO 1997 04 02 00 16 42 4.9 -9 673.50 -63.0 -61.4 -63.1 59 -99 SPO 1997 04 02 00 17 43 4.8 -9 673.50 -63.0 -61.4 -63.2 59 -99 SPO 1997 04 02 00 18 43 4.5 -9 673.60 -63.1 -61.4 -63.2 60 -99 SPO 1997 04 02 00 19 43 4.3 -9 673.60 -63.1 -61.4 -63.2 60 -99 SPO 1997 04 02 00 20 44 4.1 -9 673.60 -63.2 -61.4 -63.2 60 -99 SPO 1997 04 02 00 21 45 4.1 -9 673.60 -63.2 -61.4 -63.3 59 -99 SPO 1997 04 02 00 22 46 4.0 -9 673.60 -63.2 -61.4 -63.3 58 -99 SPO 1997 04 02 00 23 46 4.0 -9 673.60 -63.3 -61.4 -63.4 58 -99 SPO 1997 04 02 00 24 46 4.0 -9 673.60 -63.3 -61.4 -63.4 57 -99 SPO 1997 04 02 00 25 46 4.0 -9 673.60 -63.4 -61.4 -63.5 58 -99 SPO 1997 04 02 00 26 46 4.0 -9 673.60 -63.5 -61.4 -63.5 58 -99 SPO 1997 04 02 00 27 46 3.9 -9 673.60 -63.6 -61.4 -63.6 58 -99 SPO 1997 04 02 00 28 45 4.1 -9 673.60 -63.8 -61.4 -63.8 59 -99 SPO 1997 04 02 00 29 45 4.1 -9 673.60 -64.0 -61.4 -63.9 59 -99 SPO 1997 04 02 00 30 44 4.3 -9 673.60 -64.2 -61.5 -64.0 59 -99 SPO 1997 04 02 00 31 45 4.4 -9 673.60 -64.4 -61.5 -64.2 59 -99 SPO 1997 04 02 00 32 45 4.5 -9 673.60 -64.6 -61.4 -64.4 65 -99 SPO 1997 04 02 00 33 45 4.7 -9 673.60 -64.8 -61.4 -64.5 57 -99 SPO 1997 04 02 00 34 44 4.8 -9 673.60 -64.9 -61.4 -64.6 56 -99 SPO 1997 04 02 00 35 45 4.8 -9 673.50 -65.0 -61.4 -64.7 55 -99 SPO 1997 04 02 00 36 45 4.9 -9 673.50 -65.0 -61.3 -64.7 55 -99 SPO 1997 04 02 00 37 45 5.0 -9 673.50 -65.1 -61.3 -64.8 55 -99 SPO 1997 04 02 00 38 45 5.1 -9 673.50 -65.2 -61.3 -64.9 56 -99 SPO 1997 04 02 00 39 45 5.1 -9 673.50 -65.2 -61.3 -64.9 55 -99 SPO 1997 04 02 00 40 46 5.2 -9 673.50 -65.2 -61.2 -65.0 56 -99 SPO 1997 04 02 00 41 46 5.2 -9 673.50 -65.2 -61.2 -64.9 56 -99 SPO 1997 04 02 00 42 47 5.0 -9 673.50 -65.2 -61.2 -65.0 55 -99 SPO 1997 04 02 00 43 47 5.1 -9 673.50 -65.2 -61.3 -65.0 55 -99 SPO 1997 04 02 00 44 47 5.1 -9 673.50 -65.2 -61.3 -65.0 55 -99 SPO 1997 04 02 00 45 47 5.3 -9 673.40 -65.2 -61.3 -65.0 55 -99 SPO 1997 04 02 00 46 46 5.4 -9 673.40 -65.2 -61.3 -65.1 55 -99 SPO 1997 04 02 00 47 46 5.6 -9 673.40 -65.3 -61.2 -65.2 55 -99 SPO 1997 04 02 00 48 46 5.7 -9 673.40 -65.3 -61.2 -65.2 55 -99 SPO 1997 04 02 00 49 46 5.8 -9 673.30 -65.3 -61.2 -65.2 56 -99 SPO 1997 04 02 00 50 46 5.8 -9 673.30 -65.2 -61.2 -65.2 55 -99 SPO 1997 04 02 00 51 46 5.8 -9 673.30 -65.2 -61.1 -65.2 56 -99 SPO 1997 04 02 00 52 46 5.6 -9 673.30 -65.2 -61.1 -65.1 56 -99 SPO 1997 04 02 00 53 46 5.4 -9 673.40 -65.1 -61.2 -65.1 56 -99 SPO 1997 04 02 00 54 46 5.3 -9 673.40 -65.1 -61.2 -65.1 56 -99 SPO 1997 04 02 00 55 47 5.2 -9 673.40 -65.0 -61.2 -65.0 55 -99 SPO 1997 04 02 00 56 48 5.3 -9 673.40 -65.0 -61.2 -65.0 55 -99 SPO 1997 04 02 00 57 48 5.3 -9 673.30 -64.9 -61.2 -64.9 55 -99 SPO 1997 04 02 00 58 48 5.4 -9 673.30 -64.8 -61.2 -64.9 55 -99 SPO 1997 04 02 00 59 48 5.3 -9 673.30 -64.8 -61.3 -64.8 57 -99 SPO 1997 04 02 01 00 48 5.3 -9 673.30 -64.7 -61.3 -64.8 57 0 SPO 1997 04 02 01 01 48 5.2 -9 673.30 -64.7 -61.4 -64.8 58 -99 SPO 1997 04 02 01 02 48 5.3 -9 673.30 -64.6 -61.4 -64.7 58 -99 SPO 1997 04 02 01 03 47 5.5 -9 673.30 -64.6 -61.4 -64.7 59 -99 SPO 1997 04 02 01 04 46 5.7 -9 673.30 -64.5 -61.4 -64.6 59 -99 SPO 1997 04 02 01 05 46 5.6 -9 673.30 -64.4 -61.4 -64.6 59 -99 SPO 1997 04 02 01 06 46 5.7 -9 673.30 -64.4 -61.4 -64.5 59 -99 SPO 1997 04 02 01 07 46 5.5 -9 673.30 -64.3 -61.4 -64.5 58 -99 SPO 1997 04 02 01 08 47 5.3 -9 673.30 -64.3 -61.4 -64.4 58 -99 SPO 1997 04 02 01 09 47 5.2 -9 673.30 -64.2 -61.4 -64.4 58 -99 SPO 1997 04 02 01 10 47 5.3 -9 673.30 -64.2 -61.4 -64.4 59 -99 SPO 1997 04 02 01 11 47 5.5 -9 673.30 -64.2 -61.4 -64.4 59 -99 SPO 1997 04 02 01 12 46 5.7 -9 673.30 -64.2 -61.4 -64.3 59 -99 SPO 1997 04 02 01 13 46 5.6 -9 673.30 -64.2 -61.4 -64.3 59 -99 SPO 1997 04 02 01 14 45 5.7 -9 673.30 -64.1 -61.5 -64.3 59 -99 SPO 1997 04 02 01 15 45 5.8 -9 673.30 -64.1 -61.4 -64.2 59 -99 SPO 1997 04 02 01 16 44 5.9 -9 673.30 -64.1 -61.4 -64.2 60 -99 SPO 1997 04 02 01 17 43 6.3 -9 673.30 -64.0 -61.4 -64.1 59 -99 SPO 1997 04 02 01 18 42 6.6 -9 673.20 -63.9 -61.4 -64.0 59 -99 SPO 1997 04 02 01 19 41 6.9 -9 673.20 -63.8 -61.3 -63.9 58 -99 SPO 1997 04 02 01 20 41 7.0 -9 673.10 -63.8 -61.2 -63.8 59 -99 SPO 1997 04 02 01 21 41 7.1 -9 673.10 -63.7 -61.2 -63.8 58 -99 SPO 1997 04 02 01 22 40 7.2 -9 673.10 -63.6 -61.1 -63.7 59 -99 SPO 1997 04 02 01 23 39 7.1 -9 673.20 -63.6 -61.1 -63.7 60 -99 SPO 1997 04 02 01 24 40 6.9 -9 673.20 -63.5 -61.1 -63.6 60 -99 SPO 1997 04 02 01 25 40 6.8 -9 673.20 -63.4 -61.0 -63.6 60 -99 SPO 1997 04 02 01 26 39 6.8 -9 673.20 -63.4 -61.0 -63.5 60 -99 SPO 1997 04 02 01 27 40 6.7 -9 673.30 -63.3 -61.1 -63.4 60 -99 SPO 1997 04 02 01 28 39 6.7 -9 673.30 -63.3 -61.1 -63.4 60 -99 SPO 1997 04 02 01 29 40 6.7 -9 673.30 -63.3 -61.2 -63.4 60 -99 SPO 1997 04 02 01 30 40 6.5 -9 673.30 -63.3 -61.2 -63.4 60 -99 SPO 1997 04 02 01 31 40 6.3 -9 673.30 -63.2 -61.2 -63.4 59 -99 SPO 1997 04 02 01 32 40 6.2 -9 673.30 -63.2 -61.3 -63.4 59 -99 SPO 1997 04 02 01 33 42 6.1 -9 673.40 -63.2 -61.3 -63.4 59 -99 SPO 1997 04 02 01 34 43 5.9 -9 673.40 -63.2 -61.3 -63.4 60 -99 SPO 1997 04 02 01 35 44 5.8 -9 673.40 -63.2 -61.3 -63.4 60 -99 SPO 1997 04 02 01 36 44 5.8 -9 673.40 -63.2 -61.3 -63.4 60 -99 SPO 1997 04 02 01 37 45 5.9 -9 673.40 -63.3 -61.3 -63.5 60 -99 SPO 1997 04 02 01 38 44 5.8 -9 673.40 -63.3 -61.3 -63.5 60 -99 SPO 1997 04 02 01 39 44 5.9 -9 673.40 -63.3 -61.3 -63.5 60 -99 SPO 1997 04 02 01 40 44 5.8 -9 673.40 -63.3 -61.3 -63.5 60 -99 SPO 1997 04 02 01 41 43 6.0 -9 673.40 -63.3 -61.3 -63.5 59 -99 SPO 1997 04 02 01 42 43 5.9 -9 673.40 -63.3 -61.3 -63.5 59 -99 SPO 1997 04 02 01 43 42 6.0 -9 673.40 -63.4 -61.3 -63.5 60 -99 SPO 1997 04 02 01 44 42 6.0 -9 673.40 -63.4 -61.4 -63.5 59 -99 SPO 1997 04 02 01 45 42 6.2 -9 673.40 -63.4 -61.4 -63.5 59 -99 SPO 1997 04 02 01 46 41 6.4 -9 673.30 -63.4 -61.4 -63.5 60 -99 SPO 1997 04 02 01 47 41 6.5 -9 673.30 -63.4 -61.3 -63.4 60 -99 SPO 1997 04 02 01 48 41 6.4 -9 673.30 -63.4 -61.3 -63.4 60 -99 SPO 1997 04 02 01 49 42 6.6 -9 673.30 -63.4 -61.2 -63.4 60 -99 SPO 1997 04 02 01 50 42 6.6 -9 673.30 -63.3 -61.1 -63.4 60 -99 SPO 1997 04 02 01 51 42 6.4 -9 673.30 -63.3 -61.2 -63.4 60 -99 SPO 1997 04 02 01 52 43 6.3 -9 673.40 -63.3 -61.2 -63.4 59 -99 SPO 1997 04 02 01 53 43 6.2 -9 673.40 -63.3 -61.2 -63.5 58 -99 SPO 1997 04 02 01 54 43 6.2 -9 673.40 -63.4 -61.2 -63.5 59 -99 SPO 1997 04 02 01 55 43 6.3 -9 673.30 -63.4 -61.2 -63.5 58 -99 SPO 1997 04 02 01 56 43 6.6 -9 673.30 -63.3 -61.2 -63.4 57 -99 SPO 1997 04 02 01 57 42 6.6 -9 673.30 -63.3 -61.2 -63.5 58 -99 SPO 1997 04 02 01 58 41 6.6 -9 673.30 -63.4 -61.2 -63.4 59 -99 SPO 1997 04 02 01 59 41 6.7 -9 673.30 -63.4 -61.2 -63.5 60 -99 SPO 1997 04 02 02 00 42 6.8 -9 673.30 -63.4 -61.2 -63.5 60 0 SPO 1997 04 02 02 01 42 6.8 -9 673.30 -63.4 -61.2 -63.5 60 -99 SPO 1997 04 02 02 02 42 6.9 -9 673.30 -63.4 -61.2 -63.5 60 -99 SPO 1997 04 02 02 03 42 7.0 -9 673.30 -63.4 -61.1 -63.5 60 -99 SPO 1997 04 02 02 04 43 6.8 -9 673.30 -63.4 -61.1 -63.5 59 -99 SPO 1997 04 02 02 05 43 6.7 -9 673.30 -63.4 -61.1 -63.5 59 -99 SPO 1997 04 02 02 06 43 6.6 -9 673.30 -63.4 -61.1 -63.5 59 -99 SPO 1997 04 02 02 07 43 6.6 -9 673.30 -63.4 -61.0 -63.5 58 -99 SPO 1997 04 02 02 08 43 6.4 -9 673.30 -63.4 -61.0 -63.5 58 -99 SPO 1997 04 02 02 09 43 6.3 -9 673.30 -63.4 -61.1 -63.5 59 -99 SPO 1997 04 02 02 10 44 6.1 -9 673.40 -63.4 -61.1 -63.5 58 -99 SPO 1997 04 02 02 11 44 6.0 -9 673.40 -63.4 -61.1 -63.5 58 -99 SPO 1997 04 02 02 12 44 6.0 -9 673.40 -63.4 -61.2 -63.6 59 -99 SPO 1997 04 02 02 13 43 6.0 -9 673.40 -63.5 -61.2 -63.6 60 -99 SPO 1997 04 02 02 14 44 6.0 -9 673.30 -63.5 -61.2 -63.6 60 -99 SPO 1997 04 02 02 15 44 6.0 -9 673.30 -63.5 -61.2 -63.6 59 -99 SPO 1997 04 02 02 16 45 5.9 -9 673.40 -63.6 -61.3 -63.7 59 -99 SPO 1997 04 02 02 17 45 5.7 -9 673.40 -63.6 -61.3 -63.7 59 -99 SPO 1997 04 02 02 18 46 5.5 -9 673.40 -63.6 -61.3 -63.7 59 -99 SPO 1997 04 02 02 19 47 5.3 -9 673.40 -63.6 -61.4 -63.8 58 -99 SPO 1997 04 02 02 20 47 5.3 -9 673.40 -63.7 -61.4 -63.8 59 -99 SPO 1997 04 02 02 21 47 5.3 -9 673.40 -63.7 -61.4 -63.9 58 -99 SPO 1997 04 02 02 22 48 5.4 -9 673.40 -63.8 -61.4 -63.9 59 -99 SPO 1997 04 02 02 23 48 5.4 -9 673.40 -63.9 -61.4 -64.0 59 -99 SPO 1997 04 02 02 24 50 5.3 -9 673.40 -64.0 -61.5 -64.1 59 -99 SPO 1997 04 02 02 25 51 5.0 -9 673.50 -64.0 -61.6 -64.1 57 -99 SPO 1997 04 02 02 26 52 4.7 -9 673.50 -64.1 -61.6 -64.2 57 -99 SPO 1997 04 02 02 27 53 4.5 -9 673.60 -64.2 -61.8 -64.3 57 -99 SPO 1997 04 02 02 28 54 4.3 -9 673.60 -64.4 -61.8 -64.4 58 -99 SPO 1997 04 02 02 29 54 4.3 -9 673.60 -64.5 -61.9 -64.5 58 -99 SPO 1997 04 02 02 30 52 4.4 -9 673.60 -64.6 -61.9 -64.6 61 -99 SPO 1997 04 02 02 31 53 4.4 -9 673.60 -64.8 -61.9 -64.7 59 -99 SPO 1997 04 02 02 32 54 4.4 -9 673.60 -64.8 -62.0 -64.8 57 -99 SPO 1997 04 02 02 33 54 4.4 -9 673.60 -65.0 -62.0 -64.9 58 -99 SPO 1997 04 02 02 34 54 4.4 -9 673.60 -65.2 -61.9 -65.1 58 -99 SPO 1997 04 02 02 35 53 4.7 -9 673.60 -65.3 -61.9 -65.2 58 -99 SPO 1997 04 02 02 36 51 4.9 -9 673.60 -65.4 -61.9 -65.3 57 -99 SPO 1997 04 02 02 37 51 4.9 -9 673.60 -65.5 -61.8 -65.3 56 -99 SPO 1997 04 02 02 38 51 5.0 -9 673.60 -65.6 -61.8 -65.4 56 -99 SPO 1997 04 02 02 39 51 5.0 -9 673.50 -65.6 -61.8 -65.5 55 -99 SPO 1997 04 02 02 40 52 4.9 -9 673.50 -65.6 -61.8 -65.5 55 -99 SPO 1997 04 02 02 41 52 4.8 -9 673.50 -65.7 -61.9 -65.5 54 -99 SPO 1997 04 02 02 42 52 4.8 -9 673.60 -65.7 -61.9 -65.5 54 -99 SPO 1997 04 02 02 43 50 4.8 -9 673.60 -65.7 -61.9 -65.5 55 -99 SPO 1997 04 02 02 44 49 4.8 -9 673.50 -65.7 -61.9 -65.5 55 -99 SPO 1997 04 02 02 45 48 5.0 -9 673.50 -65.7 -61.8 -65.5 55 -99 SPO 1997 04 02 02 46 50 4.9 -9 673.50 -65.7 -61.9 -65.6 55 -99 SPO 1997 04 02 02 47 50 5.0 -9 673.50 -65.7 -61.8 -65.7 55 -99 SPO 1997 04 02 02 48 51 4.9 -9 673.50 -65.8 -61.9 -65.8 55 -99 SPO 1997 04 02 02 49 50 5.3 -9 673.50 -65.8 -61.8 -65.8 54 -99 SPO 1997 04 02 02 50 49 5.4 -9 673.50 -65.9 -61.8 -65.9 54 -99 SPO 1997 04 02 02 51 48 5.5 -9 673.40 -65.9 -61.7 -65.9 54 -99 SPO 1997 04 02 02 52 47 5.7 -9 673.40 -66.0 -61.6 -66.0 54 -99 SPO 1997 04 02 02 53 48 5.7 -9 673.40 -66.0 -61.6 -66.0 54 -99 SPO 1997 04 02 02 54 48 5.6 -9 673.40 -66.0 -61.6 -66.0 55 -99 SPO 1997 04 02 02 55 50 5.5 -9 673.50 -66.0 -61.6 -66.0 55 -99 SPO 1997 04 02 02 56 50 5.3 -9 673.50 -66.0 -61.7 -65.9 56 -99 SPO 1997 04 02 02 57 50 5.2 -9 673.50 -66.0 -61.8 -65.9 57 -99 SPO 1997 04 02 02 58 49 5.4 -9 673.50 -65.9 -61.7 -65.9 56 -99 SPO 1997 04 02 02 59 49 5.4 -9 673.50 -65.9 -61.7 -65.9 56 -99 SPO 1997 04 02 03 00 49 5.7 -9 673.50 -65.9 -61.7 -65.9 56 0 SPO 1997 04 02 03 01 48 5.5 -9 673.50 -65.9 -61.7 -65.9 55 -99 SPO 1997 04 02 03 02 49 5.4 -9 673.60 -65.9 -61.7 -65.9 55 -99 SPO 1997 04 02 03 03 49 5.2 -9 673.60 -65.8 -61.7 -65.9 55 -99 SPO 1997 04 02 03 04 50 5.1 -9 673.60 -65.8 -61.7 -65.9 55 -99 SPO 1997 04 02 03 05 50 5.0 -9 673.70 -65.8 -61.6 -65.9 56 -99 SPO 1997 04 02 03 06 49 5.0 -9 673.70 -65.8 -61.6 -65.9 57 -99 SPO 1997 04 02 03 07 48 5.3 -9 673.70 -65.9 -61.6 -66.0 57 -99 SPO 1997 04 02 03 08 48 5.5 -9 673.60 -65.9 -61.6 -66.0 57 -99 SPO 1997 04 02 03 09 47 5.7 -9 673.60 -65.9 -61.6 -66.0 57 -99 SPO 1997 04 02 03 10 46 6.0 -9 673.60 -65.9 -61.5 -66.0 57 -99 SPO 1997 04 02 03 11 46 6.1 -9 673.60 -65.9 -61.5 -66.0 57 -99 SPO 1997 04 02 03 12 46 6.0 -9 673.60 -65.9 -61.6 -66.0 57 -99 SPO 1997 04 02 03 13 47 5.8 -9 673.60 -65.9 -61.6 -66.0 57 -99 SPO 1997 04 02 03 14 48 5.6 -9 673.60 -65.9 -61.7 -65.9 57 -99 SPO 1997 04 02 03 15 48 5.5 -9 673.60 -65.8 -61.7 -65.9 56 -99 SPO 1997 04 02 03 16 47 5.7 -9 673.60 -65.8 -61.7 -65.8 57 -99 SPO 1997 04 02 03 17 46 6.0 -9 673.60 -65.7 -61.6 -65.8 56 -99 SPO 1997 04 02 03 18 45 6.2 -9 673.60 -65.7 -61.6 -65.8 57 -99 SPO 1997 04 02 03 19 44 6.4 -9 673.50 -65.6 -61.5 -65.7 58 -99 SPO 1997 04 02 03 20 44 6.5 -9 673.50 -65.6 -61.5 -65.7 58 -99 SPO 1997 04 02 03 21 43 6.6 -9 673.50 -65.6 -61.5 -65.6 58 -99 SPO 1997 04 02 03 22 43 6.7 -9 673.50 -65.5 -61.4 -65.6 58 -99 SPO 1997 04 02 03 23 43 6.9 -9 673.40 -65.5 -61.4 -65.5 58 -99 SPO 1997 04 02 03 24 42 7.1 -9 673.40 -65.4 -61.3 -65.5 58 -99 SPO 1997 04 02 03 25 41 6.8 -9 673.40 -65.3 -61.3 -65.4 58 -99 SPO 1997 04 02 03 26 41 6.7 -9 673.50 -65.3 -61.4 -65.4 58 -99 SPO 1997 04 02 03 27 41 6.5 -9 673.50 -65.2 -61.4 -65.2 58 -99 SPO 1997 04 02 03 28 42 6.2 -9 673.50 -65.1 -61.4 -65.2 58 -99 SPO 1997 04 02 03 29 43 6.3 -9 673.50 -65.0 -61.4 -65.1 58 -99 SPO 1997 04 02 03 30 43 6.3 -9 673.50 -65.0 -61.3 -65.0 59 -99 SPO 1997 04 02 03 31 43 6.0 -9 673.60 -64.9 -61.4 -65.0 59 -99 SPO 1997 04 02 03 32 43 5.8 -9 673.60 -64.8 -61.4 -65.0 59 -99 SPO 1997 04 02 03 33 43 5.5 -9 673.60 -64.8 -61.6 -65.0 59 -99 SPO 1997 04 02 03 34 43 5.3 -9 673.70 -64.8 -61.7 -64.9 59 -99 SPO 1997 04 02 03 35 43 5.5 -9 673.70 -64.7 -61.8 -64.9 58 -99 SPO 1997 04 02 03 36 42 5.4 -9 673.70 -64.7 -61.8 -64.8 59 -99 SPO 1997 04 02 03 37 42 5.3 -9 673.70 -64.7 -61.8 -64.8 59 -99 SPO 1997 04 02 03 38 42 5.3 -9 673.70 -64.6 -61.8 -64.8 58 -99 SPO 1997 04 02 03 39 42 5.5 -9 673.70 -64.6 -61.8 -64.8 59 -99 SPO 1997 04 02 03 40 41 5.9 -9 673.60 -64.6 -61.9 -64.7 59 -99 SPO 1997 04 02 03 41 40 6.2 -9 673.60 -64.6 -61.9 -64.7 60 -99 SPO 1997 04 02 03 42 39 6.3 -9 673.60 -64.5 -61.9 -64.6 60 -99 SPO 1997 04 02 03 43 39 6.7 -9 673.60 -64.4 -61.8 -64.5 60 -99 SPO 1997 04 02 03 44 39 6.8 -9 673.60 -64.3 -61.7 -64.3 60 -99 SPO 1997 04 02 03 45 40 7.3 -9 673.50 -64.2 -61.6 -64.2 60 -99 SPO 1997 04 02 03 46 39 7.4 -9 673.40 -64.1 -61.5 -64.1 59 -99 SPO 1997 04 02 03 47 38 7.7 -9 673.40 -64.0 -61.4 -64.0 59 -99 SPO 1997 04 02 03 48 38 7.8 -9 673.40 -63.9 -61.4 -63.8 59 -99 SPO 1997 04 02 03 49 37 7.9 -9 673.40 -63.8 -61.3 -63.8 60 -99 SPO 1997 04 02 03 50 37 8.3 -9 673.30 -63.7 -61.2 -63.7 60 -99 SPO 1997 04 02 03 51 36 8.3 -9 673.30 -63.6 -61.2 -63.6 60 -99 SPO 1997 04 02 03 52 37 8.3 -9 673.30 -63.5 -61.1 -63.5 61 -99 SPO 1997 04 02 03 53 35 8.1 -9 673.30 -63.4 -61.2 -63.4 62 -99 SPO 1997 04 02 03 54 35 8.0 -9 673.30 -63.3 -61.2 -63.3 62 -99 SPO 1997 04 02 03 55 35 7.8 -9 673.30 -63.2 -61.2 -63.2 62 -99 SPO 1997 04 02 03 56 35 7.5 -9 673.40 -63.1 -61.3 -63.2 62 -99 SPO 1997 04 02 03 57 34 7.2 -9 673.40 -63.0 -61.3 -63.1 61 -99 SPO 1997 04 02 03 58 35 6.8 -9 673.50 -63.0 -61.4 -63.1 61 -99 SPO 1997 04 02 03 59 35 6.9 -9 673.50 -63.0 -61.4 -63.1 61 -99 SPO 1997 04 02 04 00 35 6.9 -9 673.50 -62.9 -61.4 -63.0 60 0 SPO 1997 04 02 04 01 34 7.2 -9 673.50 -62.9 -61.4 -63.0 60 -99 SPO 1997 04 02 04 02 34 7.1 -9 673.50 -62.8 -61.4 -63.0 60 -99 SPO 1997 04 02 04 03 33 7.2 -9 673.40 -62.8 -61.4 -62.9 61 -99 SPO 1997 04 02 04 04 33 7.0 -9 673.50 -62.7 -61.4 -62.8 61 -99 SPO 1997 04 02 04 05 33 6.8 -9 673.50 -62.7 -61.3 -62.8 62 -99 SPO 1997 04 02 04 06 32 6.3 -9 673.60 -62.7 -61.4 -62.8 62 -99 SPO 1997 04 02 04 07 33 6.7 -9 673.60 -62.7 -61.4 -62.8 64 -99 SPO 1997 04 02 04 08 33 6.4 -9 673.60 -62.6 -61.4 -62.8 63 -99 SPO 1997 04 02 04 09 33 6.5 -9 673.60 -62.6 -61.4 -62.8 63 -99 SPO 1997 04 02 04 10 33 6.5 -9 673.60 -62.6 -61.4 -62.7 64 -99 SPO 1997 04 02 04 11 33 6.4 -9 673.60 -62.6 -61.4 -62.7 64 -99 SPO 1997 04 02 04 12 33 6.6 -9 673.60 -62.6 -61.4 -62.6 63 -99 SPO 1997 04 02 04 13 33 6.6 -9 673.60 -62.6 -61.4 -62.6 64 -99 SPO 1997 04 02 04 14 34 6.8 -9 673.60 -62.5 -61.4 -62.6 63 -99 SPO 1997 04 02 04 15 33 6.8 -9 673.50 -62.5 -61.3 -62.6 63 -99 SPO 1997 04 02 04 16 34 6.7 -9 673.50 -62.5 -61.3 -62.6 64 -99 SPO 1997 04 02 04 17 33 7.0 -9 673.50 -62.5 -61.3 -62.7 64 -99 SPO 1997 04 02 04 18 34 6.8 -9 673.50 -62.5 -61.3 -62.6 64 -99 SPO 1997 04 02 04 19 35 6.4 -9 673.60 -62.5 -61.3 -62.6 63 -99 SPO 1997 04 02 04 20 35 6.1 -9 673.70 -62.5 -61.4 -62.6 63 -99 SPO 1997 04 02 04 21 36 5.8 -9 673.70 -62.5 -61.4 -62.7 61 -99 SPO 1997 04 02 04 22 36 5.6 -9 673.80 -62.5 -61.4 -62.7 60 -99 SPO 1997 04 02 04 23 37 5.8 -9 673.80 -62.6 -61.5 -62.7 61 -99 SPO 1997 04 02 04 24 37 5.8 -9 673.80 -62.6 -61.6 -62.7 61 -99 SPO 1997 04 02 04 25 37 5.8 -9 673.80 -62.7 -61.6 -62.7 64 -99 SPO 1997 04 02 04 26 37 5.8 -9 673.80 -62.7 -61.6 -62.8 64 -99 SPO 1997 04 02 04 27 37 5.8 -9 673.80 -62.7 -61.6 -62.8 62 -99 SPO 1997 04 02 04 28 36 5.6 -9 673.80 -62.7 -61.6 -62.8 62 -99 SPO 1997 04 02 04 29 37 5.7 -9 673.80 -62.7 -61.6 -62.8 62 -99 SPO 1997 04 02 04 30 37 5.7 -9 673.80 -62.7 -61.7 -62.9 62 -99 SPO 1997 04 02 04 31 38 5.4 -9 673.80 -62.8 -61.7 -62.9 62 -99 SPO 1997 04 02 04 32 38 5.3 -9 673.80 -62.8 -61.7 -63.0 61 -99 SPO 1997 04 02 04 33 38 5.6 -9 673.80 -62.8 -61.7 -63.0 60 -99 SPO 1997 04 02 04 34 37 5.7 -9 673.80 -62.9 -61.6 -63.0 60 -99 SPO 1997 04 02 04 35 37 5.8 -9 673.80 -62.9 -61.6 -63.0 61 -99 SPO 1997 04 02 04 36 37 5.8 -9 673.80 -63.0 -61.6 -63.0 62 -99 SPO 1997 04 02 04 37 37 5.8 -9 673.80 -63.0 -61.6 -63.1 60 -99 SPO 1997 04 02 04 38 36 6.0 -9 673.80 -63.0 -61.6 -63.1 60 -99 SPO 1997 04 02 04 39 36 6.0 -9 673.80 -63.0 -61.6 -63.1 61 -99 SPO 1997 04 02 04 40 36 5.8 -9 673.80 -63.0 -61.6 -63.1 61 -99 SPO 1997 04 02 04 41 37 5.8 -9 673.80 -63.1 -61.6 -63.2 62 -99 SPO 1997 04 02 04 42 37 5.7 -9 673.80 -63.1 -61.6 -63.2 61 -99 SPO 1997 04 02 04 43 37 5.6 -9 673.80 -63.1 -61.6 -63.2 61 -99 SPO 1997 04 02 04 44 37 5.5 -9 673.80 -63.1 -61.6 -63.2 60 -99 SPO 1997 04 02 04 45 38 5.6 -9 673.80 -63.1 -61.6 -63.2 60 -99 SPO 1997 04 02 04 46 37 5.6 -9 673.80 -63.1 -61.5 -63.2 60 -99 SPO 1997 04 02 04 47 37 5.6 -9 673.80 -63.1 -61.5 -63.2 60 -99 SPO 1997 04 02 04 48 37 5.7 -9 673.80 -63.1 -61.5 -63.2 60 -99 SPO 1997 04 02 04 49 36 6.0 -9 673.80 -63.1 -61.5 -63.2 60 -99 SPO 1997 04 02 04 50 36 6.3 -9 673.80 -63.1 -61.5 -63.2 60 -99 SPO 1997 04 02 04 51 35 6.6 -9 673.70 -63.1 -61.4 -63.1 60 -99 SPO 1997 04 02 04 52 34 6.7 -9 673.70 -63.1 -61.4 -63.1 60 -99 SPO 1997 04 02 04 53 34 6.7 -9 673.70 -63.0 -61.4 -63.1 60 -99 SPO 1997 04 02 04 54 34 6.7 -9 673.70 -63.0 -61.4 -63.0 60 -99 SPO 1997 04 02 04 55 34 6.9 -9 673.70 -62.9 -61.3 -63.0 59 -99 SPO 1997 04 02 04 56 34 7.1 -9 673.70 -62.9 -61.3 -63.0 59 -99 SPO 1997 04 02 04 57 34 7.0 -9 673.70 -62.8 -61.3 -63.0 58 -99 SPO 1997 04 02 04 58 34 7.1 -9 673.70 -62.8 -61.3 -62.9 58 -99 SPO 1997 04 02 04 59 34 6.7 -9 673.70 -62.8 -61.3 -62.9 59 -99 SPO 1997 04 02 05 00 35 6.5 -9 673.80 -62.8 -61.3 -62.9 59 0 SPO 1997 04 02 05 01 35 6.2 -9 673.80 -62.8 -61.3 -62.9 59 -99 SPO 1997 04 02 05 02 35 6.4 -9 673.80 -62.8 -61.3 -62.9 60 -99 SPO 1997 04 02 05 03 35 6.5 -9 673.80 -62.8 -61.3 -62.9 60 -99 SPO 1997 04 02 05 04 35 6.5 -9 673.80 -62.8 -61.4 -62.9 60 -99 SPO 1997 04 02 05 05 36 6.6 -9 673.80 -62.8 -61.4 -62.9 60 -99 SPO 1997 04 02 05 06 35 6.6 -9 673.80 -62.8 -61.4 -63.0 60 -99 SPO 1997 04 02 05 07 36 6.4 -9 673.90 -62.8 -61.4 -63.0 59 -99 SPO 1997 04 02 05 08 36 6.4 -9 673.90 -62.8 -61.5 -63.0 58 -99 SPO 1997 04 02 05 09 36 6.3 -9 673.80 -62.8 -61.5 -63.0 57 -99 SPO 1997 04 02 05 10 37 6.6 -9 673.80 -62.9 -61.5 -63.0 58 -99 SPO 1997 04 02 05 11 37 6.7 -9 673.80 -62.9 -61.5 -63.0 58 -99 SPO 1997 04 02 05 12 37 6.7 -9 673.80 -62.9 -61.4 -63.1 58 -99 SPO 1997 04 02 05 13 37 6.6 -9 673.80 -63.0 -61.4 -63.1 59 -99 SPO 1997 04 02 05 14 37 6.4 -9 673.80 -63.0 -61.5 -63.1 59 -99 SPO 1997 04 02 05 15 38 6.4 -9 673.80 -63.0 -61.5 -63.2 59 -99 SPO 1997 04 02 05 16 38 6.4 -9 673.70 -63.1 -61.6 -63.2 60 -99 SPO 1997 04 02 05 17 38 6.5 -9 673.70 -63.1 -61.6 -63.3 59 -99 SPO 1997 04 02 05 18 38 6.7 -9 673.70 -63.2 -61.6 -63.3 60 -99 SPO 1997 04 02 05 19 38 6.6 -9 673.70 -63.2 -61.6 -63.3 59 -99 SPO 1997 04 02 05 20 38 6.5 -9 673.70 -63.2 -61.6 -63.4 58 -99 SPO 1997 04 02 05 21 37 6.4 -9 673.70 -63.3 -61.6 -63.4 58 -99 SPO 1997 04 02 05 22 37 6.3 -9 673.80 -63.3 -61.7 -63.4 58 -99 SPO 1997 04 02 05 23 37 6.2 -9 673.80 -63.3 -61.7 -63.3 59 -99 SPO 1997 04 02 05 24 37 6.2 -9 673.80 -63.3 -61.8 -63.3 59 -99 SPO 1997 04 02 05 25 36 6.0 -9 673.80 -63.3 -61.8 -63.4 59 -99 SPO 1997 04 02 05 26 37 6.2 -9 673.80 -63.3 -61.9 -63.4 60 -99 SPO 1997 04 02 05 27 37 6.3 -9 673.70 -63.2 -61.8 -63.3 58 -99 SPO 1997 04 02 05 28 37 6.5 -9 673.70 -63.2 -61.8 -63.3 58 -99 SPO 1997 04 02 05 29 36 6.3 -9 673.70 -63.2 -61.8 -63.3 59 -99 SPO 1997 04 02 05 30 35 6.4 -9 673.70 -63.2 -61.8 -63.2 60 -99 SPO 1997 04 02 05 31 36 6.6 -9 673.70 -63.2 -61.8 -63.2 59 -99 SPO 1997 04 02 05 32 35 6.8 -9 673.70 -63.1 -61.7 -63.2 58 -99 SPO 1997 04 02 05 33 35 6.7 -9 673.60 -63.1 -61.7 -63.1 57 -99 SPO 1997 04 02 05 34 35 6.9 -9 673.60 -63.1 -61.6 -63.1 57 -99 SPO 1997 04 02 05 35 35 7.0 -9 673.60 -63.0 -61.6 -63.1 57 -99 SPO 1997 04 02 05 36 34 7.0 -9 673.60 -63.0 -61.6 -63.0 57 -99 SPO 1997 04 02 05 37 34 6.9 -9 673.60 -62.9 -61.6 -62.9 57 -99 SPO 1997 04 02 05 38 35 6.8 -9 673.60 -62.8 -61.6 -62.9 57 -99 SPO 1997 04 02 05 39 37 6.9 -9 673.60 -62.8 -61.6 -63.0 59 -99 SPO 1997 04 02 05 40 37 6.3 -9 673.70 -62.9 -61.7 -63.0 60 -99 SPO 1997 04 02 05 41 36 6.3 -9 673.70 -62.8 -61.7 -63.0 60 -99 SPO 1997 04 02 05 42 35 6.3 -9 673.70 -62.8 -61.8 -62.9 60 -99 SPO 1997 04 02 05 43 36 6.4 -9 673.70 -62.8 -61.7 -62.9 59 -99 SPO 1997 04 02 05 44 35 6.6 -9 673.70 -62.7 -61.7 -62.8 58 -99 SPO 1997 04 02 05 45 35 6.9 -9 673.70 -62.7 -61.6 -62.8 58 -99 SPO 1997 04 02 05 46 34 7.3 -9 673.60 -62.7 -61.6 -62.8 58 -99 SPO 1997 04 02 05 47 35 7.2 -9 673.60 -62.7 -61.5 -62.8 58 -99 SPO 1997 04 02 05 48 35 7.0 -9 673.70 -62.7 -61.5 -62.7 58 -99 SPO 1997 04 02 05 49 34 7.0 -9 673.70 -62.6 -61.5 -62.8 58 -99 SPO 1997 04 02 05 50 34 6.8 -9 673.70 -62.6 -61.5 -62.8 58 -99 SPO 1997 04 02 05 51 33 6.5 -9 673.70 -62.6 -61.5 -62.7 58 -99 SPO 1997 04 02 05 52 33 6.8 -9 673.80 -62.6 -61.5 -62.7 59 -99 SPO 1997 04 02 05 53 32 6.5 -9 673.80 -62.6 -61.5 -62.6 60 -99 SPO 1997 04 02 05 54 34 6.6 -9 673.80 -62.6 -61.4 -62.6 61 -99 SPO 1997 04 02 05 55 34 6.8 -9 673.80 -62.5 -61.5 -62.6 60 -99 SPO 1997 04 02 05 56 35 6.7 -9 673.80 -62.6 -61.5 -62.6 61 -99 SPO 1997 04 02 05 57 35 6.4 -9 673.90 -62.5 -61.5 -62.7 59 -99 SPO 1997 04 02 05 58 35 6.4 -9 673.90 -62.5 -61.5 -62.7 59 -99 SPO 1997 04 02 05 59 36 6.3 -9 673.90 -62.6 -61.5 -62.7 60 -99 SPO 1997 04 02 06 00 35 6.5 -9 673.90 -62.6 -61.5 -62.7 60 0 SPO 1997 04 02 06 01 35 6.6 -9 673.80 -62.6 -61.5 -62.7 60 -99 SPO 1997 04 02 06 02 33 6.8 -9 673.80 -62.6 -61.5 -62.7 61 -99 SPO 1997 04 02 06 03 33 7.1 -9 673.80 -62.6 -61.5 -62.6 61 -99 SPO 1997 04 02 06 04 32 7.1 -9 673.70 -62.6 -61.5 -62.6 61 -99 SPO 1997 04 02 06 05 32 7.2 -9 673.70 -62.6 -61.4 -62.6 61 -99 SPO 1997 04 02 06 06 33 7.5 -9 673.70 -62.5 -61.5 -62.6 60 -99 SPO 1997 04 02 06 07 34 7.3 -9 673.70 -62.5 -61.5 -62.6 60 -99 SPO 1997 04 02 06 08 34 6.9 -9 673.70 -62.6 -61.5 -62.7 61 -99 SPO 1997 04 02 06 09 34 6.5 -9 673.80 -62.7 -61.5 -62.7 61 -99 SPO 1997 04 02 06 10 34 6.3 -9 673.80 -62.7 -61.6 -62.7 60 -99 SPO 1997 04 02 06 11 33 6.5 -9 673.80 -62.6 -61.6 -62.7 59 -99 SPO 1997 04 02 06 12 33 7.0 -9 673.70 -62.5 -61.6 -62.6 58 -99 SPO 1997 04 02 06 13 33 6.9 -9 673.70 -62.5 -61.7 -62.6 58 -99 SPO 1997 04 02 06 14 32 6.9 -9 673.70 -62.5 -61.6 -62.6 59 -99 SPO 1997 04 02 06 15 33 6.5 -9 673.80 -62.5 -61.6 -62.6 59 -99 SPO 1997 04 02 06 16 32 6.2 -9 673.80 -62.5 -61.6 -62.6 60 -99 SPO 1997 04 02 06 17 33 6.0 -9 673.90 -62.5 -61.6 -62.6 60 -99 SPO 1997 04 02 06 18 33 5.3 -9 674.00 -62.4 -61.6 -62.5 59 -99 SPO 1997 04 02 06 19 33 5.3 -9 674.00 -62.4 -61.7 -62.6 59 -99 SPO 1997 04 02 06 20 35 5.5 -9 674.00 -62.4 -61.7 -62.5 57 -99 SPO 1997 04 02 06 21 36 5.7 -9 674.00 -62.4 -61.7 -62.5 57 -99 SPO 1997 04 02 06 22 36 6.0 -9 674.00 -62.4 -61.7 -62.6 58 -99 SPO 1997 04 02 06 23 36 5.8 -9 674.00 -62.5 -61.7 -62.6 59 -99 SPO 1997 04 02 06 24 35 5.7 -9 674.00 -62.5 -61.7 -62.5 59 -99 SPO 1997 04 02 06 25 35 5.7 -9 674.00 -62.5 -61.7 -62.6 59 -99 SPO 1997 04 02 06 26 33 5.6 -9 674.00 -62.5 -61.6 -62.5 60 -99 SPO 1997 04 02 06 27 34 5.8 -9 674.00 -62.4 -61.6 -62.5 60 -99 SPO 1997 04 02 06 28 35 6.0 -9 674.00 -62.3 -61.5 -62.5 61 -99 SPO 1997 04 02 06 29 34 5.9 -9 674.00 -62.4 -61.6 -62.5 61 -99 SPO 1997 04 02 06 30 34 5.6 -9 674.10 -62.4 -61.6 -62.5 60 -99 SPO 1997 04 02 06 31 34 5.8 -9 674.10 -62.4 -61.6 -62.5 60 -99 SPO 1997 04 02 06 32 34 5.4 -9 674.20 -62.4 -61.5 -62.5 59 -99 SPO 1997 04 02 06 33 35 5.4 -9 674.20 -62.4 -61.5 -62.5 58 -99 SPO 1997 04 02 06 34 36 5.2 -9 674.20 -62.4 -61.5 -62.5 57 -99 SPO 1997 04 02 06 35 36 5.3 -9 674.20 -62.4 -61.5 -62.5 57 -99 SPO 1997 04 02 06 36 35 5.5 -9 674.20 -62.3 -61.5 -62.5 57 -99 SPO 1997 04 02 06 37 34 5.6 -9 674.20 -62.4 -61.5 -62.4 58 -99 SPO 1997 04 02 06 38 33 5.8 -9 674.20 -62.4 -61.5 -62.4 59 -99 SPO 1997 04 02 06 39 34 5.9 -9 674.20 -62.3 -61.4 -62.4 59 -99 SPO 1997 04 02 06 40 34 6.0 -9 674.20 -62.3 -61.4 -62.4 61 -99 SPO 1997 04 02 06 41 34 6.2 -9 674.20 -62.3 -61.4 -62.4 61 -99 SPO 1997 04 02 06 42 33 6.1 -9 674.10 -62.3 -61.4 -62.4 61 -99 SPO 1997 04 02 06 43 33 6.1 -9 674.20 -62.2 -61.4 -62.3 61 -99 SPO 1997 04 02 06 44 33 6.0 -9 674.20 -62.2 -61.3 -62.3 61 -99 SPO 1997 04 02 06 45 33 5.9 -9 674.20 -62.2 -61.3 -62.3 61 -99 SPO 1997 04 02 06 46 34 5.6 -9 674.30 -62.2 -61.3 -62.3 60 -99 SPO 1997 04 02 06 47 33 5.4 -9 674.30 -62.2 -61.4 -62.3 60 -99 SPO 1997 04 02 06 48 34 5.5 -9 674.30 -62.2 -61.3 -62.3 60 -99 SPO 1997 04 02 06 49 35 5.1 -9 674.30 -62.2 -61.4 -62.3 60 -99 SPO 1997 04 02 06 50 34 5.4 -9 674.30 -62.2 -61.4 -62.3 61 -99 SPO 1997 04 02 06 51 34 5.3 -9 674.40 -62.2 -61.5 -62.2 61 -99 SPO 1997 04 02 06 52 34 5.3 -9 674.40 -62.2 -61.5 -62.2 61 -99 SPO 1997 04 02 06 53 35 5.0 -9 674.40 -62.2 -61.5 -62.2 61 -99 SPO 1997 04 02 06 54 36 4.8 -9 674.40 -62.1 -61.6 -62.2 61 -99 SPO 1997 04 02 06 55 38 4.9 -9 674.40 -62.1 -61.5 -62.2 61 -99 SPO 1997 04 02 06 56 38 4.8 -9 674.40 -62.1 -61.5 -62.2 61 -99 SPO 1997 04 02 06 57 39 4.9 -9 674.40 -62.2 -61.6 -62.2 61 -99 SPO 1997 04 02 06 58 41 5.0 -9 674.40 -62.1 -61.5 -62.2 60 -99 SPO 1997 04 02 06 59 40 5.1 -9 674.40 -62.1 -61.5 -62.2 60 -99 SPO 1997 04 02 07 00 39 5.3 -9 674.40 -62.1 -61.5 -62.2 59 0 SPO 1997 04 02 07 01 39 5.5 -9 674.40 -62.1 -61.4 -62.2 60 -99 SPO 1997 04 02 07 02 38 5.9 -9 674.30 -62.1 -61.4 -62.2 60 -99 SPO 1997 04 02 07 03 38 5.8 -9 674.40 -62.1 -61.4 -62.2 59 -99 SPO 1997 04 02 07 04 36 5.8 -9 674.40 -62.1 -61.4 -62.2 59 -99 SPO 1997 04 02 07 05 38 5.5 -9 674.40 -62.1 -61.4 -62.2 59 -99 SPO 1997 04 02 07 06 39 5.2 -9 674.40 -62.2 -61.5 -62.2 60 -99 SPO 1997 04 02 07 07 40 4.9 -9 674.50 -62.2 -61.5 -62.3 60 -99 SPO 1997 04 02 07 08 41 4.6 -9 674.50 -62.2 -61.6 -62.3 60 -99 SPO 1997 04 02 07 09 41 4.5 -9 674.50 -62.2 -61.6 -62.3 60 -99 SPO 1997 04 02 07 10 40 4.5 -9 674.60 -62.2 -61.6 -62.3 60 -99 SPO 1997 04 02 07 11 40 4.8 -9 674.50 -62.3 -61.6 -62.3 61 -99 SPO 1997 04 02 07 12 40 5.0 -9 674.50 -62.2 -61.6 -62.3 60 -99 SPO 1997 04 02 07 13 40 5.2 -9 674.50 -62.2 -61.5 -62.3 60 -99 SPO 1997 04 02 07 14 40 5.5 -9 674.40 -62.2 -61.5 -62.4 60 -99 SPO 1997 04 02 07 15 39 5.7 -9 674.40 -62.3 -61.5 -62.4 61 -99 SPO 1997 04 02 07 16 38 5.7 -9 674.40 -62.3 -61.5 -62.4 59 -99 SPO 1997 04 02 07 17 39 5.6 -9 674.40 -62.4 -61.5 -62.5 59 -99 SPO 1997 04 02 07 18 39 5.5 -9 674.40 -62.4 -61.5 -62.5 58 -99 SPO 1997 04 02 07 19 39 5.5 -9 674.40 -62.4 -61.5 -62.5 57 -99 SPO 1997 04 02 07 20 40 5.3 -9 674.50 -62.4 -61.5 -62.5 57 -99 SPO 1997 04 02 07 21 39 5.3 -9 674.50 -62.4 -61.5 -62.6 57 -99 SPO 1997 04 02 07 22 39 5.2 -9 674.50 -62.6 -61.6 -62.6 58 -99 SPO 1997 04 02 07 23 39 4.9 -9 674.60 -62.6 -61.5 -62.6 57 -99 SPO 1997 04 02 07 24 39 4.7 -9 674.60 -62.6 -61.6 -62.6 57 -99 SPO 1997 04 02 07 25 40 4.5 -9 674.70 -62.6 -61.6 -62.6 58 -99 SPO 1997 04 02 07 26 41 4.5 -9 674.70 -62.6 -61.7 -62.7 58 -99 SPO 1997 04 02 07 27 41 4.6 -9 674.70 -62.6 -61.7 -62.7 57 -99 SPO 1997 04 02 07 28 40 4.8 -9 674.60 -62.6 -61.7 -62.7 57 -99 SPO 1997 04 02 07 29 39 5.3 -9 674.60 -62.7 -61.7 -62.8 58 -99 SPO 1997 04 02 07 30 38 5.5 -9 674.50 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 31 37 5.6 -9 674.50 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 32 36 5.8 -9 674.50 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 33 36 5.9 -9 674.40 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 34 35 5.9 -9 674.50 -62.7 -61.5 -62.8 56 -99 SPO 1997 04 02 07 35 34 5.9 -9 674.40 -62.7 -61.5 -62.8 56 -99 SPO 1997 04 02 07 36 34 5.9 -9 674.40 -62.7 -61.5 -62.8 57 -99 SPO 1997 04 02 07 37 34 5.8 -9 674.50 -62.7 -61.5 -62.8 57 -99 SPO 1997 04 02 07 38 35 5.8 -9 674.50 -62.8 -61.5 -62.7 59 -99 SPO 1997 04 02 07 39 35 5.6 -9 674.50 -62.7 -61.5 -62.7 58 -99 SPO 1997 04 02 07 40 37 5.3 -9 674.50 -62.6 -61.5 -62.7 58 -99 SPO 1997 04 02 07 41 37 5.2 -9 674.60 -62.6 -61.5 -62.7 58 -99 SPO 1997 04 02 07 42 37 5.0 -9 674.60 -62.7 -61.5 -62.7 58 -99 SPO 1997 04 02 07 43 38 4.7 -9 674.60 -62.7 -61.6 -62.7 58 -99 SPO 1997 04 02 07 44 39 4.7 -9 674.70 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 45 40 4.8 -9 674.70 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 46 42 4.7 -9 674.70 -62.7 -61.6 -62.8 57 -99 SPO 1997 04 02 07 47 42 4.8 -9 674.70 -62.7 -61.6 -62.7 57 -99 SPO 1997 04 02 07 48 42 4.8 -9 674.60 -62.7 -61.6 -62.8 58 -99 SPO 1997 04 02 07 49 40 5.1 -9 674.60 -62.6 -61.7 -62.7 57 -99 SPO 1997 04 02 07 50 39 5.1 -9 674.60 -62.6 -61.7 -62.7 57 -99 SPO 1997 04 02 07 51 38 4.9 -9 674.60 -62.6 -61.7 -62.7 59 -99 SPO 1997 04 02 07 52 37 5.0 -9 674.60 -62.6 -61.7 -62.7 59 -99 SPO 1997 04 02 07 53 36 5.1 -9 674.60 -62.6 -61.7 -62.7 59 -99 SPO 1997 04 02 07 54 35 5.2 -9 674.60 -62.6 -61.6 -62.6 58 -99 SPO 1997 04 02 07 55 34 5.3 -9 674.60 -62.5 -61.6 -62.6 57 -99 SPO 1997 04 02 07 56 35 5.3 -9 674.60 -62.5 -61.5 -62.6 57 -99 SPO 1997 04 02 07 57 35 5.3 -9 674.60 -62.5 -61.5 -62.6 57 -99 SPO 1997 04 02 07 58 35 5.5 -9 674.60 -62.4 -61.5 -62.5 57 -99 SPO 1997 04 02 07 59 35 5.4 -9 674.60 -62.4 -61.5 -62.5 58 -99 SPO 1997 04 02 08 00 35 5.6 -9 674.60 -62.3 -61.5 -62.4 58 0 SPO 1997 04 02 08 01 35 5.6 -9 674.60 -62.3 -61.5 -62.4 61 -99 SPO 1997 04 02 08 02 35 5.6 -9 674.60 -62.2 -61.4 -62.3 60 -99 SPO 1997 04 02 08 03 35 5.7 -9 674.60 -62.2 -61.4 -62.2 61 -99 SPO 1997 04 02 08 04 35 5.9 -9 674.60 -62.1 -61.4 -62.2 61 -99 SPO 1997 04 02 08 05 34 6.1 -9 674.60 -62.1 -61.4 -62.2 61 -99 SPO 1997 04 02 08 06 34 6.2 -9 674.60 -62.1 -61.4 -62.1 61 -99 SPO 1997 04 02 08 07 33 6.1 -9 674.60 -62.0 -61.4 -62.1 61 -99 SPO 1997 04 02 08 08 32 6.5 -9 674.60 -62.0 -61.4 -62.0 61 -99 SPO 1997 04 02 08 09 33 6.6 -9 674.50 -61.9 -61.4 -62.0 60 -99 SPO 1997 04 02 08 10 32 6.5 -9 674.50 -61.9 -61.3 -62.0 60 -99 SPO 1997 04 02 08 11 33 6.5 -9 674.50 -61.8 -61.3 -61.9 60 -99 SPO 1997 04 02 08 12 33 6.6 -9 674.50 -61.8 -61.3 -61.9 61 -99 SPO 1997 04 02 08 13 33 6.3 -9 674.60 -61.8 -61.3 -61.8 62 -99 SPO 1997 04 02 08 14 34 6.5 -9 674.50 -61.7 -61.3 -61.8 62 -99 SPO 1997 04 02 08 15 34 6.5 -9 674.50 -61.7 -61.3 -61.8 62 -99 SPO 1997 04 02 08 16 33 6.7 -9 674.60 -61.6 -61.2 -61.8 62 -99 SPO 1997 04 02 08 17 32 6.6 -9 674.60 -61.6 -61.2 -61.7 62 -99 SPO 1997 04 02 08 18 32 6.6 -9 674.60 -61.6 -61.2 -61.7 61 -99 SPO 1997 04 02 08 19 31 6.7 -9 674.50 -61.6 -61.2 -61.6 61 -99 SPO 1997 04 02 08 20 32 6.8 -9 674.50 -61.5 -61.2 -61.6 60 -99 SPO 1997 04 02 08 21 31 6.5 -9 674.60 -61.5 -61.3 -61.6 61 -99 SPO 1997 04 02 08 22 31 6.5 -9 674.60 -61.5 -61.2 -61.6 62 -99 SPO 1997 04 02 08 23 32 6.5 -9 674.60 -61.5 -61.2 -61.6 62 -99 SPO 1997 04 02 08 24 32 6.6 -9 674.60 -61.5 -61.2 -61.6 62 -99 SPO 1997 04 02 08 25 32 6.3 -9 674.60 -61.5 -61.1 -61.6 63 -99 SPO 1997 04 02 08 26 33 6.5 -9 674.60 -61.4 -61.1 -61.5 62 -99 SPO 1997 04 02 08 27 31 6.5 -9 674.60 -61.4 -61.0 -61.5 62 -99 SPO 1997 04 02 08 28 31 6.5 -9 674.70 -61.4 -61.0 -61.5 63 -99 SPO 1997 04 02 08 29 31 6.6 -9 674.60 -61.4 -61.0 -61.5 63 -99 SPO 1997 04 02 08 30 31 6.6 -9 674.60 -61.3 -61.0 -61.4 62 -99 SPO 1997 04 02 08 31 30 6.9 -9 674.60 -61.3 -60.9 -61.4 62 -99 SPO 1997 04 02 08 32 31 7.1 -9 674.60 -61.3 -60.8 -61.4 61 -99 SPO 1997 04 02 08 33 31 6.9 -9 674.60 -61.2 -60.8 -61.3 60 -99 SPO 1997 04 02 08 34 32 7.2 -9 674.60 -61.3 -60.8 -61.3 61 -99 SPO 1997 04 02 08 35 30 7.2 -9 674.60 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 08 36 31 7.3 -9 674.60 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 08 37 28 7.2 -9 674.60 -61.2 -60.7 -61.3 61 -99 SPO 1997 04 02 08 38 29 7.0 -9 674.60 -61.2 -60.8 -61.3 62 -99 SPO 1997 04 02 08 39 28 7.0 -9 674.60 -61.2 -60.9 -61.3 62 -99 SPO 1997 04 02 08 40 28 7.0 -9 674.70 -61.2 -60.9 -61.3 62 -99 SPO 1997 04 02 08 41 27 7.2 -9 674.70 -61.2 -60.9 -61.3 62 -99 SPO 1997 04 02 08 42 26 7.0 -9 674.70 -61.2 -60.9 -61.3 61 -99 SPO 1997 04 02 08 43 26 7.1 -9 674.70 -61.2 -60.9 -61.3 61 -99 SPO 1997 04 02 08 44 26 7.2 -9 674.70 -61.2 -60.9 -61.3 61 -99 SPO 1997 04 02 08 45 26 6.9 -9 674.70 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 46 26 6.9 -9 674.70 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 47 25 7.0 -9 674.70 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 48 24 7.0 -9 674.70 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 49 23 7.0 -9 674.70 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 50 23 6.8 -9 674.70 -61.2 -61.0 -61.3 61 -99 SPO 1997 04 02 08 51 23 6.8 -9 674.70 -61.3 -60.9 -61.3 62 -99 SPO 1997 04 02 08 52 22 6.9 -9 674.70 -61.3 -60.9 -61.3 62 -99 SPO 1997 04 02 08 53 22 6.8 -9 674.70 -61.2 -60.9 -61.3 61 -99 SPO 1997 04 02 08 54 22 6.4 -9 674.80 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 55 22 6.5 -9 674.80 -61.3 -60.9 -61.3 61 -99 SPO 1997 04 02 08 56 23 6.6 -9 674.80 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 57 23 6.6 -9 674.80 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 58 23 6.7 -9 674.80 -61.2 -60.9 -61.3 60 -99 SPO 1997 04 02 08 59 22 6.7 -9 674.80 -61.3 -60.8 -61.4 61 -99 SPO 1997 04 02 09 00 23 6.4 -9 674.80 -61.2 -60.8 -61.3 61 0 SPO 1997 04 02 09 01 22 6.7 -9 674.90 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 09 02 23 6.5 -9 674.90 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 09 03 23 6.5 -9 674.90 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 09 04 22 6.7 -9 674.90 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 09 05 23 6.5 -9 674.90 -61.2 -60.9 -61.3 61 -99 SPO 1997 04 02 09 06 22 6.6 -9 674.90 -61.2 -60.8 -61.3 61 -99 SPO 1997 04 02 09 07 22 6.6 -9 674.90 -61.2 -60.8 -61.2 61 -99 SPO 1997 04 02 09 08 23 6.7 -9 674.90 -61.2 -60.8 -61.2 62 -99 SPO 1997 04 02 09 09 24 6.7 -9 674.90 -61.1 -60.8 -61.2 61 -99 SPO 1997 04 02 09 10 23 6.6 -9 674.90 -61.1 -60.8 -61.2 60 -99 SPO 1997 04 02 09 11 24 6.6 -9 674.90 -61.1 -60.8 -61.2 61 -99 SPO 1997 04 02 09 12 24 6.5 -9 674.90 -61.1 -60.8 -61.2 62 -99 SPO 1997 04 02 09 13 24 6.4 -9 674.90 -61.0 -60.7 -61.1 61 -99 SPO 1997 04 02 09 14 25 6.3 -9 674.90 -61.0 -60.7 -61.1 62 -99 SPO 1997 04 02 09 15 24 6.7 -9 674.90 -61.0 -60.7 -61.1 62 -99 SPO 1997 04 02 09 16 25 6.5 -9 674.90 -61.0 -60.7 -61.0 62 -99 SPO 1997 04 02 09 17 25 6.3 -9 674.90 -61.0 -60.7 -61.0 61 -99 SPO 1997 04 02 09 18 25 6.2 -9 674.90 -60.9 -60.7 -61.0 60 -99 SPO 1997 04 02 09 19 24 6.2 -9 674.90 -60.9 -60.8 -61.0 60 -99 SPO 1997 04 02 09 20 23 6.2 -9 674.90 -60.9 -60.8 -61.0 59 -99 SPO 1997 04 02 09 21 24 6.2 -9 674.90 -60.9 -60.8 -61.0 59 -99 SPO 1997 04 02 09 22 24 6.2 -9 674.90 -60.9 -60.8 -61.0 60 -99 SPO 1997 04 02 09 23 24 6.1 -9 674.90 -60.8 -60.8 -60.9 61 -99 SPO 1997 04 02 09 24 25 6.1 -9 674.90 -60.8 -60.7 -60.9 62 -99 SPO 1997 04 02 09 25 25 5.9 -9 674.90 -60.8 -60.7 -60.9 62 -99 SPO 1997 04 02 09 26 24 6.4 -9 674.90 -60.8 -60.7 -60.8 63 -99 SPO 1997 04 02 09 27 25 6.2 -9 674.90 -60.7 -60.6 -60.8 62 -99 SPO 1997 04 02 09 28 25 6.4 -9 674.90 -60.7 -60.6 -60.7 62 -99 SPO 1997 04 02 09 29 26 6.3 -9 674.90 -60.6 -60.6 -60.7 62 -99 SPO 1997 04 02 09 30 26 6.4 -9 674.90 -60.6 -60.6 -60.7 62 -99 SPO 1997 04 02 09 31 26 6.2 -9 674.90 -60.6 -60.6 -60.7 61 -99 SPO 1997 04 02 09 32 27 6.3 -9 674.90 -60.6 -60.6 -60.7 60 -99 SPO 1997 04 02 09 33 26 6.2 -9 674.90 -60.6 -60.6 -60.7 60 -99 SPO 1997 04 02 09 34 26 6.3 -9 674.90 -60.6 -60.6 -60.6 61 -99 SPO 1997 04 02 09 35 25 6.2 -9 674.90 -60.5 -60.6 -60.6 61 -99 SPO 1997 04 02 09 36 25 6.3 -9 675.00 -60.5 -60.5 -60.6 62 -99 SPO 1997 04 02 09 37 25 6.5 -9 675.00 -60.5 -60.5 -60.5 63 -99 SPO 1997 04 02 09 38 25 6.2 -9 675.00 -60.5 -60.6 -60.5 63 -99 SPO 1997 04 02 09 39 25 5.9 -9 675.10 -60.5 -60.6 -60.5 63 -99 SPO 1997 04 02 09 40 24 5.7 -9 675.10 -60.4 -60.6 -60.5 63 -99 SPO 1997 04 02 09 41 25 5.7 -9 675.20 -60.4 -60.5 -60.5 62 -99 SPO 1997 04 02 09 42 26 5.7 -9 675.20 -60.4 -60.5 -60.5 62 -99 SPO 1997 04 02 09 43 26 5.9 -9 675.20 -60.4 -60.5 -60.5 62 -99 SPO 1997 04 02 09 44 26 5.8 -9 675.20 -60.4 -60.5 -60.4 62 -99 SPO 1997 04 02 09 45 25 5.9 -9 675.20 -60.3 -60.5 -60.4 61 -99 SPO 1997 04 02 09 46 25 5.8 -9 675.20 -60.3 -60.4 -60.4 61 -99 SPO 1997 04 02 09 47 24 5.7 -9 675.20 -60.3 -60.4 -60.4 60 -99 SPO 1997 04 02 09 48 22 6.0 -9 675.20 -60.3 -60.4 -60.4 61 -99 SPO 1997 04 02 09 49 24 5.6 -9 675.20 -60.2 -60.3 -60.3 61 -99 SPO 1997 04 02 09 50 23 5.7 -9 675.20 -60.2 -60.4 -60.3 62 -99 SPO 1997 04 02 09 51 23 5.7 -9 675.20 -60.2 -60.4 -60.3 63 -99 SPO 1997 04 02 09 52 24 5.9 -9 675.20 -60.2 -60.4 -60.3 63 -99 SPO 1997 04 02 09 53 24 5.8 -9 675.20 -60.2 -60.4 -60.2 62 -99 SPO 1997 04 02 09 54 23 5.8 -9 675.20 -60.2 -60.3 -60.2 61 -99 SPO 1997 04 02 09 55 21 5.7 -9 675.30 -60.1 -60.3 -60.2 60 -99 SPO 1997 04 02 09 56 20 5.7 -9 675.30 -60.1 -60.2 -60.2 60 -99 SPO 1997 04 02 09 57 21 5.7 -9 675.30 -60.0 -60.2 -60.1 60 -99 SPO 1997 04 02 09 58 19 6.2 -9 675.30 -60.0 -60.2 -60.1 60 -99 SPO 1997 04 02 09 59 19 5.9 -9 675.30 -60.0 -60.1 -60.1 61 -99 SPO 1997 04 02 10 00 19 5.7 -9 675.40 -60.0 -60.1 -60.1 61 0 SPO 1997 04 02 10 01 19 6.1 -9 675.40 -59.9 -60.1 -60.0 61 -99 SPO 1997 04 02 10 02 19 5.8 -9 675.40 -59.9 -60.1 -60.0 61 -99 SPO 1997 04 02 10 03 19 5.6 -9 675.40 -59.9 -60.1 -60.0 61 -99 SPO 1997 04 02 10 04 18 6.0 -9 675.40 -59.9 -60.1 -60.0 61 -99 SPO 1997 04 02 10 05 19 5.8 -9 675.40 -59.9 -60.1 -60.0 61 -99 SPO 1997 04 02 10 06 19 5.9 -9 675.30 -59.9 -60.1 -59.9 61 -99 SPO 1997 04 02 10 07 18 6.2 -9 675.30 -59.8 -60.1 -59.9 60 -99 SPO 1997 04 02 10 08 18 6.4 -9 675.40 -59.8 -60.1 -59.9 60 -99 SPO 1997 04 02 10 09 18 6.1 -9 675.40 -59.8 -60.0 -59.9 61 -99 SPO 1997 04 02 10 10 20 5.7 -9 675.40 -59.8 -60.0 -59.9 62 -99 SPO 1997 04 02 10 11 18 6.1 -9 675.40 -59.8 -60.0 -59.8 63 -99 SPO 1997 04 02 10 12 18 5.8 -9 675.40 -59.8 -60.0 -59.8 63 -99 SPO 1997 04 02 10 13 16 6.2 -9 675.30 -59.7 -60.0 -59.8 61 -99 SPO 1997 04 02 10 14 17 6.2 -9 675.40 -59.7 -59.9 -59.8 62 -99 SPO 1997 04 02 10 15 18 6.3 -9 675.40 -59.7 -59.9 -59.8 62 -99 SPO 1997 04 02 10 16 18 6.1 -9 675.40 -59.7 -59.9 -59.8 61 -99 SPO 1997 04 02 10 17 20 6.3 -9 675.40 -59.7 -59.9 -59.8 61 -99 SPO 1997 04 02 10 18 21 6.1 -9 675.40 -59.7 -59.9 -59.8 61 -99 SPO 1997 04 02 10 19 21 6.0 -9 675.40 -59.7 -60.0 -59.8 60 -99 SPO 1997 04 02 10 20 22 6.1 -9 675.40 -59.7 -60.0 -59.8 61 -99 SPO 1997 04 02 10 21 21 6.0 -9 675.40 -59.7 -60.0 -59.8 62 -99 SPO 1997 04 02 10 22 22 6.4 -9 675.40 -59.7 -60.0 -59.8 62 -99 SPO 1997 04 02 10 23 23 6.2 -9 675.40 -59.7 -60.0 -59.8 62 -99 SPO 1997 04 02 10 24 23 6.3 -9 675.40 -59.7 -60.0 -59.8 61 -99 SPO 1997 04 02 10 25 23 6.3 -9 675.40 -59.7 -60.0 -59.8 62 -99 SPO 1997 04 02 10 26 24 6.4 -9 675.40 -59.7 -60.0 -59.8 62 -99 SPO 1997 04 02 10 27 24 6.1 -9 675.40 -59.7 -59.9 -59.8 62 -99 SPO 1997 04 02 10 28 23 6.3 -9 675.40 -59.7 -59.9 -59.8 61 -99 SPO 1997 04 02 10 29 24 5.9 -9 675.40 -59.7 -59.9 -59.8 60 -99 SPO 1997 04 02 10 30 25 6.0 -9 675.40 -59.7 -59.9 -59.8 60 -99 SPO 1997 04 02 10 31 26 5.9 -9 675.50 -59.7 -59.9 -59.8 60 -99 SPO 1997 04 02 10 32 25 6.2 -9 675.50 -59.7 -59.9 -59.8 60 -99 SPO 1997 04 02 10 33 24 6.0 -9 675.50 -59.7 -59.9 -59.7 60 -99 SPO 1997 04 02 10 34 25 6.2 -9 675.50 -59.6 -59.8 -59.7 60 -99 SPO 1997 04 02 10 35 23 6.5 -9 675.50 -59.6 -59.9 -59.7 60 -99 SPO 1997 04 02 10 36 23 6.5 -9 675.40 -59.6 -59.9 -59.7 60 -99 SPO 1997 04 02 10 37 23 6.2 -9 675.40 -59.6 -59.9 -59.7 61 -99 SPO 1997 04 02 10 38 24 5.8 -9 675.40 -59.6 -59.9 -59.7 61 -99 SPO 1997 04 02 10 39 23 6.7 -9 675.50 -59.6 -59.9 -59.7 61 -99 SPO 1997 04 02 10 40 22 5.9 -9 675.40 -59.6 -59.9 -59.7 60 -99 SPO 1997 04 02 10 41 23 6.1 -9 675.40 -59.6 -59.9 -59.7 60 -99 SPO 1997 04 02 10 42 24 6.5 -9 675.50 -59.6 -59.8 -59.7 60 -99 SPO 1997 04 02 10 43 22 6.4 -9 675.50 -59.6 -59.8 -59.6 60 -99 SPO 1997 04 02 10 44 23 6.1 -9 675.50 -59.5 -59.8 -59.6 59 -99 SPO 1997 04 02 10 45 22 6.3 -9 675.50 -59.5 -59.8 -59.6 60 -99 SPO 1997 04 02 10 46 22 6.0 -9 675.50 -59.5 -59.7 -59.6 61 -99 SPO 1997 04 02 10 47 20 6.7 -9 675.50 -59.5 -59.7 -59.6 61 -99 SPO 1997 04 02 10 48 22 5.9 -9 675.50 -59.5 -59.6 -59.5 61 -99 SPO 1997 04 02 10 49 22 6.1 -9 675.50 -59.4 -59.6 -59.5 61 -99 SPO 1997 04 02 10 50 21 6.3 -9 675.50 -59.4 -59.6 -59.5 61 -99 SPO 1997 04 02 10 51 23 6.2 -9 675.50 -59.4 -59.7 -59.5 60 -99 SPO 1997 04 02 10 52 22 6.1 -9 675.50 -59.4 -59.7 -59.5 60 -99 SPO 1997 04 02 10 53 20 6.1 -9 675.50 -59.4 -59.7 -59.5 60 -99 SPO 1997 04 02 10 54 20 6.2 -9 675.50 -59.4 -59.7 -59.5 60 -99 SPO 1997 04 02 10 55 19 6.5 -9 675.50 -59.4 -59.7 -59.5 60 -99 SPO 1997 04 02 10 56 20 6.5 -9 675.50 -59.4 -59.7 -59.5 60 -99 SPO 1997 04 02 10 57 19 6.0 -9 675.50 -59.4 -59.7 -59.5 61 -99 SPO 1997 04 02 10 58 20 6.4 -9 675.60 -59.4 -59.6 -59.5 61 -99 SPO 1997 04 02 10 59 20 6.0 -9 675.60 -59.4 -59.6 -59.5 61 -99 SPO 1997 04 02 11 00 20 5.6 -9 675.60 -59.4 -59.6 -59.5 61 0 SPO 1997 04 02 11 01 20 5.8 -9 675.60 -59.4 -59.6 -59.5 61 -99 SPO 1997 04 02 11 02 20 5.8 -9 675.60 -59.4 -59.6 -59.4 61 -99 SPO 1997 04 02 11 03 19 6.1 -9 675.60 -59.4 -59.6 -59.4 61 -99 SPO 1997 04 02 11 04 18 6.2 -9 675.60 -59.4 -59.5 -59.4 61 -99 SPO 1997 04 02 11 05 18 6.6 -9 675.60 -59.4 -59.5 -59.4 59 -99 SPO 1997 04 02 11 06 19 6.2 -9 675.60 -59.3 -59.6 -59.4 59 -99 SPO 1997 04 02 11 07 20 6.3 -9 675.60 -59.3 -59.6 -59.4 59 -99 SPO 1997 04 02 11 08 19 6.3 -9 675.60 -59.3 -59.6 -59.4 60 -99 SPO 1997 04 02 11 09 19 6.2 -9 675.60 -59.3 -59.6 -59.4 61 -99 SPO 1997 04 02 11 10 19 6.2 -9 675.60 -59.3 -59.6 -59.4 61 -99 SPO 1997 04 02 11 11 19 6.1 -9 675.60 -59.3 -59.6 -59.4 61 -99 SPO 1997 04 02 11 12 20 6.2 -9 675.60 -59.3 -59.6 -59.4 61 -99 SPO 1997 04 02 11 13 19 6.1 -9 675.60 -59.3 -59.5 -59.4 61 -99 SPO 1997 04 02 11 14 20 6.3 -9 675.70 -59.3 -59.5 -59.4 61 -99 SPO 1997 04 02 11 15 23 5.7 -9 675.70 -59.3 -59.5 -59.4 60 -99 SPO 1997 04 02 11 16 24 5.9 -9 675.70 -59.3 -59.5 -59.4 60 -99 SPO 1997 04 02 11 17 23 6.3 -9 675.70 -59.3 -59.5 -59.4 60 -99 SPO 1997 04 02 11 18 24 5.7 -9 675.70 -59.3 -59.4 -59.3 60 -99 SPO 1997 04 02 11 19 24 6.1 -9 675.80 -59.2 -59.4 -59.3 60 -99 SPO 1997 04 02 11 20 25 6.0 -9 675.80 -59.3 -59.4 -59.3 61 -99 SPO 1997 04 02 11 21 24 6.1 -9 675.80 -59.2 -59.4 -59.3 60 -99 SPO 1997 04 02 11 22 25 6.1 -9 675.80 -59.2 -59.5 -59.4 61 -99 SPO 1997 04 02 11 23 26 5.7 -9 675.80 -59.3 -59.5 -59.4 61 -99 SPO 1997 04 02 11 24 26 5.8 -9 675.80 -59.3 -59.6 -59.4 61 -99 SPO 1997 04 02 11 25 25 5.9 -9 675.80 -59.3 -59.5 -59.4 61 -99 SPO 1997 04 02 11 26 24 5.8 -9 675.80 -59.3 -59.5 -59.4 61 -99 SPO 1997 04 02 11 27 24 5.9 -9 675.80 -59.3 -59.5 -59.4 60 -99 SPO 1997 04 02 11 28 24 5.3 -9 675.80 -59.3 -59.5 -59.4 60 -99 SPO 1997 04 02 11 29 24 5.6 -9 675.80 -59.2 -59.5 -59.4 59 -99 SPO 1997 04 02 11 30 25 5.7 -9 675.80 -59.3 -59.4 -59.4 60 -99 SPO 1997 04 02 11 31 24 5.9 -9 675.80 -59.3 -59.4 -59.4 60 -99 SPO 1997 04 02 11 32 24 5.6 -9 675.80 -59.3 -59.4 -59.4 61 -99 SPO 1997 04 02 11 33 26 5.6 -9 675.80 -59.3 -59.4 -59.3 61 -99 SPO 1997 04 02 11 34 26 5.4 -9 675.80 -59.3 -59.4 -59.4 61 -99 SPO 1997 04 02 11 35 24 5.4 -9 675.80 -59.3 -59.4 -59.4 61 -99 SPO 1997 04 02 11 36 23 5.7 -9 675.90 -59.2 -59.4 -59.3 60 -99 SPO 1997 04 02 11 37 23 5.4 -9 675.90 -59.2 -59.5 -59.3 60 -99 SPO 1997 04 02 11 38 23 5.4 -9 675.90 -59.2 -59.5 -59.3 60 -99 SPO 1997 04 02 11 39 24 5.3 -9 675.90 -59.2 -59.5 -59.3 61 -99 SPO 1997 04 02 11 40 23 5.2 -9 675.90 -59.2 -59.5 -59.3 61 -99 SPO 1997 04 02 11 41 22 5.5 -9 676.00 -59.2 -59.5 -59.3 61 -99 SPO 1997 04 02 11 42 23 5.3 -9 676.00 -59.2 -59.5 -59.3 61 -99 SPO 1997 04 02 11 43 25 5.3 -9 676.00 -59.2 -59.5 -59.3 62 -99 SPO 1997 04 02 11 44 26 5.0 -9 676.10 -59.2 -59.4 -59.3 61 -99 SPO 1997 04 02 11 45 25 5.2 -9 676.00 -59.2 -59.4 -59.3 62 -99 SPO 1997 04 02 11 46 26 5.3 -9 676.10 -59.1 -59.4 -59.2 61 -99 SPO 1997 04 02 11 47 27 4.9 -9 676.10 -59.1 -59.4 -59.2 61 -99 SPO 1997 04 02 11 48 27 5.6 -9 676.10 -59.1 -59.3 -59.2 61 -99 SPO 1997 04 02 11 49 25 5.3 -9 676.10 -59.1 -59.3 -59.2 61 -99 SPO 1997 04 02 11 50 26 5.0 -9 676.10 -59.1 -59.3 -59.2 61 -99 SPO 1997 04 02 11 51 27 5.2 -9 676.10 -59.1 -59.3 -59.2 61 -99 SPO 1997 04 02 11 52 26 5.5 -9 676.10 -59.1 -59.3 -59.2 61 -99 SPO 1997 04 02 11 53 26 5.1 -9 676.10 -59.1 -59.3 -59.2 61 -99 SPO 1997 04 02 11 54 24 5.3 -9 676.10 -59.1 -59.4 -59.2 61 -99 SPO 1997 04 02 11 55 23 5.3 -9 676.20 -59.1 -59.4 -59.1 62 -99 SPO 1997 04 02 11 56 23 5.1 -9 676.20 -59.1 -59.4 -59.2 62 -99 SPO 1997 04 02 11 57 24 5.0 -9 676.20 -59.0 -59.3 -59.1 61 -99 SPO 1997 04 02 11 58 25 5.1 -9 676.20 -59.0 -59.3 -59.2 61 -99 SPO 1997 04 02 11 59 24 5.0 -9 676.20 -59.0 -59.3 -59.1 61 -99 SPO 1997 04 02 12 00 25 5.1 -9 676.20 -59.0 -59.3 -59.1 61 0 SPO 1997 04 02 12 01 26 5.4 -9 676.30 -59.0 -59.3 -59.1 61 -99 SPO 1997 04 02 12 02 27 5.1 -9 676.30 -59.0 -59.3 -59.1 61 -99 SPO 1997 04 02 12 03 27 5.1 -9 676.20 -59.0 -59.2 -59.1 60 -99 SPO 1997 04 02 12 04 27 5.3 -9 676.30 -59.0 -59.2 -59.1 60 -99 SPO 1997 04 02 12 05 27 5.4 -9 676.30 -59.0 -59.2 -59.0 61 -99 SPO 1997 04 02 12 06 26 5.0 -9 676.30 -58.9 -59.2 -59.0 60 -99 SPO 1997 04 02 12 07 26 5.4 -9 676.30 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 08 26 5.3 -9 676.30 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 09 28 5.3 -9 676.30 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 10 31 5.4 -9 676.30 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 11 29 5.5 -9 676.30 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 12 29 5.7 -9 676.30 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 13 31 5.4 -9 676.40 -58.9 -59.2 -59.0 61 -99 SPO 1997 04 02 12 14 31 5.7 -9 676.30 -58.9 -59.2 -59.0 62 -99 SPO 1997 04 02 12 15 29 5.7 -9 676.30 -58.9 -59.2 -59.0 62 -99 SPO 1997 04 02 12 16 28 5.9 -9 676.30 -58.9 -59.2 -59.0 63 -99 SPO 1997 04 02 12 17 27 5.5 -9 676.30 -58.9 -59.2 -59.0 63 -99 SPO 1997 04 02 12 18 26 5.8 -9 676.30 -58.9 -59.2 -59.0 64 -99 SPO 1997 04 02 12 19 25 5.7 -9 676.30 -58.9 -59.2 -59.0 64 -99 SPO 1997 04 02 12 20 25 6.2 -9 676.30 -58.9 -59.2 -59.0 64 -99 SPO 1997 04 02 12 21 24 5.5 -9 676.40 -58.9 -59.2 -59.0 64 -99 SPO 1997 04 02 12 22 25 5.8 -9 676.40 -58.9 -59.1 -58.9 63 -99 SPO 1997 04 02 12 23 24 5.9 -9 676.40 -58.8 -59.1 -58.9 61 -99 SPO 1997 04 02 12 24 24 5.6 -9 676.40 -58.8 -59.1 -58.9 61 -99 SPO 1997 04 02 12 25 22 5.8 -9 676.40 -58.8 -59.1 -58.9 61 -99 SPO 1997 04 02 12 26 22 5.9 -9 676.30 -58.8 -59.2 -58.9 61 -99 SPO 1997 04 02 12 27 22 5.8 -9 676.40 -58.8 -59.2 -58.9 61 -99 SPO 1997 04 02 12 28 21 5.5 -9 676.40 -58.8 -59.1 -58.9 62 -99 SPO 1997 04 02 12 29 20 5.8 -9 676.30 -58.8 -59.1 -58.9 62 -99 SPO 1997 04 02 12 30 20 5.7 -9 676.30 -58.8 -59.1 -58.9 63 -99 SPO 1997 04 02 12 31 21 5.8 -9 676.30 -58.8 -59.1 -58.9 64 -99 SPO 1997 04 02 12 32 22 6.1 -9 676.30 -58.8 -59.1 -58.9 64 -99 SPO 1997 04 02 12 33 20 5.8 -9 676.30 -58.8 -59.1 -58.9 63 -99 SPO 1997 04 02 12 34 20 5.7 -9 676.30 -58.8 -59.1 -58.8 63 -99 SPO 1997 04 02 12 35 19 5.7 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 36 20 6.0 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 37 19 5.9 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 38 18 6.0 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 39 19 6.1 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 40 16 5.8 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 41 15 6.1 -9 676.30 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 12 42 16 6.6 -9 676.30 -58.7 -59.1 -58.8 63 -99 SPO 1997 04 02 12 43 14 6.6 -9 676.30 -58.7 -59.1 -58.8 63 -99 SPO 1997 04 02 12 44 14 6.8 -9 676.30 -58.7 -59.1 -58.8 64 -99 SPO 1997 04 02 12 45 15 6.8 -9 676.30 -58.7 -59.1 -58.8 64 -99 SPO 1997 04 02 12 46 14 6.6 -9 676.30 -58.7 -59.1 -58.8 63 -99 SPO 1997 04 02 12 47 13 6.8 -9 676.30 -58.7 -59.1 -58.8 63 -99 SPO 1997 04 02 12 48 13 6.4 -9 676.30 -58.7 -59.0 -58.8 63 -99 SPO 1997 04 02 12 49 14 6.7 -9 676.30 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 12 50 13 6.7 -9 676.30 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 12 51 13 6.9 -9 676.30 -58.6 -59.0 -58.8 62 -99 SPO 1997 04 02 12 52 12 7.2 -9 676.30 -58.7 -59.0 -58.8 63 -99 SPO 1997 04 02 12 53 13 6.6 -9 676.30 -58.7 -59.0 -58.8 63 -99 SPO 1997 04 02 12 54 11 6.7 -9 676.40 -58.7 -59.0 -58.8 63 -99 SPO 1997 04 02 12 55 13 7.1 -9 676.30 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 12 56 13 6.8 -9 676.40 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 12 57 14 7.0 -9 676.40 -58.7 -59.1 -58.8 61 -99 SPO 1997 04 02 12 58 14 6.2 -9 676.40 -58.7 -59.1 -58.8 61 -99 SPO 1997 04 02 12 59 14 6.7 -9 676.40 -58.7 -59.1 -58.8 61 -99 SPO 1997 04 02 13 00 14 6.6 -9 676.40 -58.7 -59.0 -58.8 61 0 SPO 1997 04 02 13 01 13 6.7 -9 676.40 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 02 13 6.9 -9 676.40 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 03 13 6.8 -9 676.40 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 13 04 13 6.4 -9 676.40 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 13 05 12 6.9 -9 676.40 -58.7 -59.1 -58.8 62 -99 SPO 1997 04 02 13 06 12 7.0 -9 676.40 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 13 07 14 6.5 -9 676.50 -58.7 -59.0 -58.8 63 -99 SPO 1997 04 02 13 08 15 6.9 -9 676.50 -58.7 -59.0 -58.8 62 -99 SPO 1997 04 02 13 09 16 6.7 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 10 15 6.6 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 11 18 6.5 -9 676.50 -58.7 -59.0 -58.8 60 -99 SPO 1997 04 02 13 12 18 6.7 -9 676.50 -58.7 -58.9 -58.8 60 -99 SPO 1997 04 02 13 13 18 6.7 -9 676.50 -58.7 -59.0 -58.8 60 -99 SPO 1997 04 02 13 14 18 6.6 -9 676.50 -58.7 -59.0 -58.8 60 -99 SPO 1997 04 02 13 15 18 6.5 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 16 18 7.0 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 17 18 6.8 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 18 17 6.7 -9 676.50 -58.7 -59.0 -58.7 61 -99 SPO 1997 04 02 13 19 18 7.0 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 20 18 6.8 -9 676.50 -58.6 -59.0 -58.8 61 -99 SPO 1997 04 02 13 21 17 6.9 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 22 17 6.9 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 23 15 7.3 -9 676.50 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 24 17 7.0 -9 676.50 -58.7 -58.9 -58.8 60 -99 SPO 1997 04 02 13 25 16 6.8 -9 676.50 -58.6 -58.9 -58.7 60 -99 SPO 1997 04 02 13 26 16 6.6 -9 676.50 -58.7 -58.9 -58.7 61 -99 SPO 1997 04 02 13 27 17 6.9 -9 676.60 -58.7 -58.9 -58.8 61 -99 SPO 1997 04 02 13 28 17 7.1 -9 676.60 -58.6 -58.9 -58.8 60 -99 SPO 1997 04 02 13 29 15 7.1 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 30 16 6.3 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 31 15 6.8 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 32 15 6.9 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 33 16 6.7 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 34 16 6.7 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 35 16 7.0 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 36 16 6.6 -9 676.60 -58.7 -59.0 -58.8 61 -99 SPO 1997 04 02 13 37 16 6.5 -9 676.70 -58.6 -58.9 -58.7 61 -99 SPO 1997 04 02 13 38 16 6.6 -9 676.70 -58.6 -58.9 -58.7 61 -99 SPO 1997 04 02 13 39 15 6.5 -9 676.70 -58.6 -58.9 -58.7 62 -99 SPO 1997 04 02 13 40 15 7.1 -9 676.70 -58.6 -58.9 -58.7 62 -99 SPO 1997 04 02 13 41 15 7.2 -9 676.70 -58.6 -58.9 -58.7 61 -99 SPO 1997 04 02 13 42 16 6.9 -9 676.70 -58.6 -58.9 -58.7 61 -99 SPO 1997 04 02 13 43 16 7.0 -9 676.70 -58.6 -58.9 -58.7 59 -99 SPO 1997 04 02 13 44 17 7.3 -9 676.70 -58.6 -58.9 -58.7 59 -99 SPO 1997 04 02 13 45 17 6.8 -9 676.70 -58.6 -58.9 -58.7 59 -99 SPO 1997 04 02 13 46 15 7.2 -9 676.70 -58.6 -58.9 -58.7 59 -99 SPO 1997 04 02 13 47 16 7.5 -9 676.60 -58.6 -59.0 -58.7 59 -99 SPO 1997 04 02 13 48 16 6.7 -9 676.70 -58.6 -58.9 -58.7 59 -99 SPO 1997 04 02 13 49 15 7.2 -9 676.70 -58.6 -58.9 -58.7 61 -99 SPO 1997 04 02 13 50 15 7.5 -9 676.70 -58.6 -58.9 -58.7 61 -99 SPO 1997 04 02 13 51 15 7.1 -9 676.70 -58.6 -58.9 -58.7 62 -99 SPO 1997 04 02 13 52 16 7.3 -9 676.70 -58.6 -58.9 -58.7 62 -99 SPO 1997 04 02 13 53 17 7.2 -9 676.70 -58.6 -58.9 -58.6 62 -99 SPO 1997 04 02 13 54 17 7.3 -9 676.70 -58.6 -58.8 -58.6 62 -99 SPO 1997 04 02 13 55 17 7.1 -9 676.70 -58.6 -58.8 -58.6 62 -99 SPO 1997 04 02 13 56 18 7.0 -9 676.70 -58.5 -58.8 -58.6 61 -99 SPO 1997 04 02 13 57 17 7.1 -9 676.70 -58.5 -58.8 -58.6 61 -99 SPO 1997 04 02 13 58 19 6.9 -9 676.70 -58.5 -58.8 -58.6 60 -99 SPO 1997 04 02 13 59 18 7.0 -9 676.70 -58.5 -58.8 -58.6 60 -99 SPO 1997 04 02 14 00 19 7.0 -9 676.80 -58.5 -58.8 -58.6 60 0 SPO 1997 04 02 14 01 18 7.2 -9 676.80 -58.5 -58.8 -58.6 61 -99 SPO 1997 04 02 14 02 19 7.1 -9 676.80 -58.5 -58.8 -58.6 62 -99 SPO 1997 04 02 14 03 18 6.8 -9 676.80 -58.5 -58.8 -58.6 62 -99 SPO 1997 04 02 14 04 19 6.7 -9 676.80 -58.5 -58.8 -58.6 62 -99 SPO 1997 04 02 14 05 18 7.2 -9 676.80 -58.5 -58.8 -58.6 62 -99 SPO 1997 04 02 14 06 18 7.1 -9 676.80 -58.5 -58.8 -58.6 62 -99 SPO 1997 04 02 14 07 17 7.0 -9 676.80 -58.5 -58.8 -58.6 62 -99 SPO 1997 04 02 14 08 17 7.0 -9 676.80 -58.5 -58.8 -58.6 61 -99 SPO 1997 04 02 14 09 16 7.1 -9 676.80 -58.5 -58.8 -58.6 61 -99 SPO 1997 04 02 14 10 17 7.0 -9 676.80 -58.5 -58.8 -58.5 60 -99 SPO 1997 04 02 14 11 16 7.0 -9 676.90 -58.5 -58.7 -58.5 61 -99 SPO 1997 04 02 14 12 16 6.1 -9 676.90 -58.4 -58.7 -58.5 61 -99 SPO 1997 04 02 14 13 16 6.6 -9 676.90 -58.4 -58.7 -58.5 61 -99 SPO 1997 04 02 14 14 16 6.3 -9 676.90 -58.4 -58.7 -58.5 61 -99 SPO 1997 04 02 14 15 16 6.4 -9 676.90 -58.4 -58.7 -58.5 61 -99 SPO 1997 04 02 14 16 16 6.9 -9 676.90 -58.4 -58.7 -58.5 61 -99 SPO 1997 04 02 14 17 17 6.2 -9 676.90 -58.4 -58.7 -58.5 61 -99 SPO 1997 04 02 14 18 18 6.6 -9 676.90 -58.4 -58.7 -58.5 60 -99 SPO 1997 04 02 14 19 17 6.6 -9 676.90 -58.4 -58.7 -58.5 60 -99 SPO 1997 04 02 14 20 17 6.2 -9 677.00 -58.4 -58.7 -58.5 60 -99 SPO 1997 04 02 14 21 16 6.6 -9 677.00 -58.4 -58.7 -58.5 60 -99 SPO 1997 04 02 14 22 17 5.9 -9 677.00 -58.4 -58.7 -58.5 60 -99 SPO 1997 04 02 14 23 17 5.9 -9 677.00 -58.4 -58.7 -58.4 61 -99 SPO 1997 04 02 14 24 18 5.6 -9 677.10 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 25 18 5.8 -9 677.10 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 14 26 18 5.8 -9 677.10 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 14 27 17 5.5 -9 677.10 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 14 28 16 5.6 -9 677.20 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 14 29 16 5.4 -9 677.10 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 30 16 5.6 -9 677.20 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 14 31 16 5.8 -9 677.20 -58.3 -58.6 -58.4 59 -99 SPO 1997 04 02 14 32 16 5.8 -9 677.10 -58.3 -58.6 -58.4 59 -99 SPO 1997 04 02 14 33 17 5.5 -9 677.20 -58.3 -58.6 -58.4 59 -99 SPO 1997 04 02 14 34 16 5.8 -9 677.10 -58.3 -58.6 -58.4 59 -99 SPO 1997 04 02 14 35 17 5.7 -9 677.20 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 14 36 17 5.2 -9 677.20 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 14 37 18 5.8 -9 677.20 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 38 18 5.4 -9 677.20 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 39 18 5.0 -9 677.30 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 40 18 4.9 -9 677.30 -58.3 -58.5 -58.4 61 -99 SPO 1997 04 02 14 41 18 5.0 -9 677.30 -58.3 -58.5 -58.4 60 -99 SPO 1997 04 02 14 42 17 5.0 -9 677.30 -58.3 -58.5 -58.4 60 -99 SPO 1997 04 02 14 43 16 5.0 -9 677.30 -58.3 -58.5 -58.4 60 -99 SPO 1997 04 02 14 44 18 4.8 -9 677.30 -58.2 -58.5 -58.4 59 -99 SPO 1997 04 02 14 45 17 5.0 -9 677.30 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 14 46 16 4.9 -9 677.30 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 14 47 17 5.1 -9 677.30 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 14 48 15 5.0 -9 677.30 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 14 49 15 5.0 -9 677.30 -58.3 -58.6 -58.3 61 -99 SPO 1997 04 02 14 50 17 5.1 -9 677.30 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 14 51 18 5.1 -9 677.30 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 14 52 18 5.1 -9 677.30 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 53 16 5.3 -9 677.30 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 54 17 5.0 -9 677.40 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 14 55 16 4.6 -9 677.40 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 14 56 17 4.2 -9 677.40 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 14 57 17 4.6 -9 677.40 -58.3 -58.5 -58.4 60 -99 SPO 1997 04 02 14 58 16 5.0 -9 677.40 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 14 59 17 4.7 -9 677.40 -58.3 -58.5 -58.4 62 -99 SPO 1997 04 02 15 00 19 4.5 -9 677.40 -58.3 -58.5 -58.4 62 0 SPO 1997 04 02 15 01 18 4.7 -9 677.40 -58.3 -58.5 -58.4 62 -99 SPO 1997 04 02 15 02 19 5.0 -9 677.40 -58.3 -58.5 -58.4 62 -99 SPO 1997 04 02 15 03 19 5.0 -9 677.40 -58.3 -58.5 -58.4 61 -99 SPO 1997 04 02 15 04 19 5.0 -9 677.30 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 15 05 19 5.3 -9 677.30 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 15 06 18 5.3 -9 677.30 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 15 07 17 5.0 -9 677.30 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 15 08 18 4.9 -9 677.30 -58.3 -58.6 -58.4 60 -99 SPO 1997 04 02 15 09 19 5.1 -9 677.30 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 15 10 19 4.9 -9 677.30 -58.3 -58.6 -58.4 61 -99 SPO 1997 04 02 15 11 20 4.9 -9 677.30 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 15 12 21 4.9 -9 677.40 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 15 13 21 4.8 -9 677.40 -58.3 -58.6 -58.4 62 -99 SPO 1997 04 02 15 14 23 5.0 -9 677.40 -58.3 -58.5 -58.4 62 -99 SPO 1997 04 02 15 15 24 5.0 -9 677.40 -58.3 -58.5 -58.4 61 -99 SPO 1997 04 02 15 16 24 5.0 -9 677.40 -58.2 -58.5 -58.3 60 -99 SPO 1997 04 02 15 17 25 4.9 -9 677.40 -58.2 -58.5 -58.3 60 -99 SPO 1997 04 02 15 18 25 5.0 -9 677.40 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 15 19 25 5.1 -9 677.40 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 15 20 28 4.9 -9 677.40 -58.2 -58.5 -58.3 59 -99 SPO 1997 04 02 15 21 29 5.1 -9 677.40 -58.2 -58.5 -58.3 61 -99 SPO 1997 04 02 15 22 28 5.0 -9 677.50 -58.2 -58.5 -58.3 62 -99 SPO 1997 04 02 15 23 29 4.9 -9 677.50 -58.2 -58.5 -58.3 62 -99 SPO 1997 04 02 15 24 31 4.9 -9 677.50 -58.2 -58.5 -58.3 62 -99 SPO 1997 04 02 15 25 31 4.9 -9 677.50 -58.2 -58.5 -58.3 62 -99 SPO 1997 04 02 15 26 30 5.0 -9 677.50 -58.2 -58.5 -58.3 61 -99 SPO 1997 04 02 15 27 28 5.1 -9 677.50 -58.2 -58.5 -58.3 61 -99 SPO 1997 04 02 15 28 27 4.9 -9 677.50 -58.2 -58.5 -58.3 60 -99 SPO 1997 04 02 15 29 30 4.5 -9 677.60 -58.2 -58.4 -58.3 60 -99 SPO 1997 04 02 15 30 31 5.0 -9 677.60 -58.2 -58.4 -58.3 59 -99 SPO 1997 04 02 15 31 27 5.1 -9 677.50 -58.2 -58.4 -58.3 60 -99 SPO 1997 04 02 15 32 29 5.1 -9 677.50 -58.2 -58.4 -58.3 60 -99 SPO 1997 04 02 15 33 30 4.7 -9 677.60 -58.2 -58.4 -58.3 61 -99 SPO 1997 04 02 15 34 30 5.0 -9 677.60 -58.2 -58.4 -58.3 61 -99 SPO 1997 04 02 15 35 31 4.9 -9 677.60 -58.1 -58.4 -58.3 60 -99 SPO 1997 04 02 15 36 32 4.8 -9 677.60 -58.2 -58.5 -58.2 61 -99 SPO 1997 04 02 15 37 31 4.8 -9 677.60 -58.1 -58.5 -58.2 60 -99 SPO 1997 04 02 15 38 31 5.0 -9 677.60 -58.2 -58.5 -58.2 61 -99 SPO 1997 04 02 15 39 30 5.0 -9 677.60 -58.2 -58.5 -58.2 61 -99 SPO 1997 04 02 15 40 30 5.0 -9 677.60 -58.2 -58.5 -58.3 62 -99 SPO 1997 04 02 15 41 30 5.0 -9 677.60 -58.2 -58.5 -58.2 62 -99 SPO 1997 04 02 15 42 30 5.1 -9 677.60 -58.1 -58.5 -58.2 61 -99 SPO 1997 04 02 15 43 30 4.9 -9 677.60 -58.1 -58.4 -58.2 61 -99 SPO 1997 04 02 15 44 32 4.5 -9 677.70 -58.1 -58.4 -58.2 61 -99 SPO 1997 04 02 15 45 30 4.7 -9 677.70 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 46 31 4.5 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 47 32 4.4 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 48 33 4.5 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 49 33 4.5 -9 677.80 -58.1 -58.4 -58.2 61 -99 SPO 1997 04 02 15 50 33 4.5 -9 677.80 -58.1 -58.4 -58.2 60 -99 SPO 1997 04 02 15 51 34 4.4 -9 677.80 -58.1 -58.4 -58.2 59 -99 SPO 1997 04 02 15 52 32 4.4 -9 677.80 -58.1 -58.4 -58.2 59 -99 SPO 1997 04 02 15 53 30 4.0 -9 677.80 -58.1 -58.4 -58.2 60 -99 SPO 1997 04 02 15 54 30 4.4 -9 677.80 -58.1 -58.4 -58.1 61 -99 SPO 1997 04 02 15 55 34 4.3 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 56 36 4.4 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 57 34 4.4 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 58 33 4.6 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 15 59 32 5.1 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 00 32 5.0 -9 677.80 -58.1 -58.4 -58.2 62 0 SPO 1997 04 02 16 01 32 5.2 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 02 31 5.0 -9 677.80 -58.1 -58.4 -58.2 61 -99 SPO 1997 04 02 16 03 31 5.2 -9 677.80 -58.1 -58.4 -58.2 61 -99 SPO 1997 04 02 16 04 32 5.1 -9 677.80 -58.1 -58.3 -58.2 61 -99 SPO 1997 04 02 16 05 31 5.2 -9 677.80 -58.1 -58.3 -58.2 61 -99 SPO 1997 04 02 16 06 32 5.0 -9 677.80 -58.1 -58.3 -58.2 61 -99 SPO 1997 04 02 16 07 32 5.2 -9 677.80 -58.1 -58.3 -58.2 61 -99 SPO 1997 04 02 16 08 32 5.0 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 09 31 5.3 -9 677.80 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 10 30 5.2 -9 677.90 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 11 29 5.1 -9 677.90 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 12 30 5.3 -9 677.90 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 13 32 5.0 -9 678.00 -58.1 -58.4 -58.2 62 -99 SPO 1997 04 02 16 14 31 4.9 -9 678.00 -58.1 -58.4 -58.2 61 -99 SPO 1997 04 02 16 15 33 5.2 -9 678.00 -58.1 -58.3 -58.1 61 -99 SPO 1997 04 02 16 16 33 4.9 -9 678.00 -58.1 -58.3 -58.2 61 -99 SPO 1997 04 02 16 17 33 4.9 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 18 34 5.0 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 19 34 5.0 -9 678.00 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 20 34 4.6 -9 678.00 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 21 33 4.7 -9 678.00 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 22 33 4.9 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 23 33 5.1 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 24 32 5.2 -9 678.00 -58.0 -58.3 -58.1 60 -99 SPO 1997 04 02 16 25 33 5.0 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 26 34 4.9 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 27 34 5.2 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 28 32 5.4 -9 678.00 -58.0 -58.3 -58.1 61 -99 SPO 1997 04 02 16 29 31 5.2 -9 678.00 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 30 32 5.1 -9 678.10 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 31 34 4.7 -9 678.10 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 32 35 4.8 -9 678.10 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 33 35 5.0 -9 678.10 -58.0 -58.3 -58.1 62 -99 SPO 1997 04 02 16 34 35 4.9 -9 678.10 -58.0 -58.2 -58.1 61 -99 SPO 1997 04 02 16 35 35 4.7 -9 678.10 -58.0 -58.2 -58.0 61 -99 SPO 1997 04 02 16 36 34 4.9 -9 678.20 -58.0 -58.2 -58.0 60 -99 SPO 1997 04 02 16 37 35 4.7 -9 678.20 -57.9 -58.2 -58.0 59 -99 SPO 1997 04 02 16 38 36 4.8 -9 678.20 -57.9 -58.1 -58.0 59 -99 SPO 1997 04 02 16 39 35 4.5 -9 678.20 -57.9 -58.2 -58.0 59 -99 SPO 1997 04 02 16 40 36 4.5 -9 678.20 -57.9 -58.2 -58.0 59 -99 SPO 1997 04 02 16 41 36 4.6 -9 678.20 -57.9 -58.2 -58.0 60 -99 SPO 1997 04 02 16 42 34 5.0 -9 678.20 -57.9 -58.2 -58.0 61 -99 SPO 1997 04 02 16 43 32 5.0 -9 678.20 -57.9 -58.2 -58.0 61 -99 SPO 1997 04 02 16 44 31 4.9 -9 678.20 -57.9 -58.1 -58.0 62 -99 SPO 1997 04 02 16 45 32 4.9 -9 678.20 -57.9 -58.2 -58.0 62 -99 SPO 1997 04 02 16 46 34 4.9 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 47 34 4.7 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 48 35 4.7 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 49 34 4.9 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 16 50 34 4.4 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 16 51 34 4.4 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 16 52 34 4.4 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 53 32 4.8 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 54 33 4.7 -9 678.20 -57.8 -58.0 -57.9 61 -99 SPO 1997 04 02 16 55 32 4.3 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 56 33 4.9 -9 678.20 -57.8 -58.1 -57.9 62 -99 SPO 1997 04 02 16 57 34 4.5 -9 678.20 -57.8 -58.1 -57.9 62 -99 SPO 1997 04 02 16 58 34 4.5 -9 678.20 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 16 59 34 4.5 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 17 00 34 4.2 -9 678.30 -57.8 -58.1 -57.9 60 0 SPO 1997 04 02 17 01 32 4.7 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 17 02 32 4.9 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 17 03 33 4.3 -9 678.20 -57.8 -58.1 -57.9 60 -99 SPO 1997 04 02 17 04 33 4.6 -9 678.30 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 17 05 34 4.8 -9 678.30 -57.8 -58.1 -57.9 61 -99 SPO 1997 04 02 17 06 34 4.6 -9 678.30 -57.8 -58.1 -57.9 62 -99 SPO 1997 04 02 17 07 34 4.4 -9 678.30 -57.8 -58.0 -57.9 63 -99 SPO 1997 04 02 17 08 36 4.2 -9 678.30 -57.8 -58.0 -57.9 62 -99 SPO 1997 04 02 17 09 37 4.4 -9 678.40 -57.8 -58.0 -57.9 62 -99 SPO 1997 04 02 17 10 37 4.5 -9 678.40 -57.8 -58.0 -57.8 61 -99 SPO 1997 04 02 17 11 36 4.7 -9 678.40 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 12 37 4.7 -9 678.40 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 13 36 4.7 -9 678.40 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 14 37 4.7 -9 678.40 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 15 37 4.5 -9 678.40 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 16 37 4.6 -9 678.50 -57.7 -58.0 -57.8 61 -99 SPO 1997 04 02 17 17 37 4.7 -9 678.40 -57.7 -58.0 -57.8 61 -99 SPO 1997 04 02 17 18 36 4.6 -9 678.50 -57.7 -58.0 -57.8 63 -99 SPO 1997 04 02 17 19 37 4.5 -9 678.50 -57.7 -58.0 -57.8 63 -99 SPO 1997 04 02 17 20 34 4.8 -9 678.50 -57.7 -58.0 -57.8 63 -99 SPO 1997 04 02 17 21 36 4.6 -9 678.50 -57.7 -58.0 -57.8 63 -99 SPO 1997 04 02 17 22 36 4.6 -9 678.50 -57.7 -58.0 -57.8 63 -99 SPO 1997 04 02 17 23 35 4.5 -9 678.50 -57.7 -58.0 -57.8 61 -99 SPO 1997 04 02 17 24 34 4.7 -9 678.50 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 25 34 4.5 -9 678.50 -57.7 -58.0 -57.8 60 -99 SPO 1997 04 02 17 26 35 4.7 -9 678.50 -57.7 -57.9 -57.8 -99 -99 SPO 1997 04 02 17 27 36 4.7 -9 678.50 -57.7 -57.9 -57.8 -99 -99 SPO 1997 04 02 17 28 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 29 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 30 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 31 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 32 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 33 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 34 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 35 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 36 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 37 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 38 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 39 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 40 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 41 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 02 17 42 34 4.3 -9 678.60 -57.6 -57.8 -57.7 -99 -99 SPO 1997 04 02 17 43 32 4.6 -9 678.60 -57.6 -57.9 -57.7 -99 -99 SPO 1997 04 02 17 44 33 4.6 -9 678.60 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 17 45 32 4.7 -9 678.60 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 17 46 32 4.8 -9 678.60 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 17 47 32 4.5 -9 678.70 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 17 48 33 4.6 -9 678.70 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 17 49 33 4.9 -9 678.70 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 17 50 33 4.5 -9 678.70 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 17 51 34 4.9 -9 678.70 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 17 52 35 4.9 -9 678.70 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 17 53 35 4.5 -9 678.80 -57.6 -57.8 -57.7 63 -99 SPO 1997 04 02 17 54 37 4.6 -9 678.80 -57.6 -57.8 -57.7 63 -99 SPO 1997 04 02 17 55 36 4.8 -9 678.80 -57.6 -57.8 -57.7 63 -99 SPO 1997 04 02 17 56 36 4.7 -9 678.80 -57.6 -57.8 -57.7 63 -99 SPO 1997 04 02 17 57 35 4.9 -9 678.80 -57.6 -57.8 -57.7 62 -99 SPO 1997 04 02 17 58 36 5.1 -9 678.80 -57.6 -57.8 -57.7 60 -99 SPO 1997 04 02 17 59 35 5.0 -9 678.80 -57.6 -57.8 -57.7 59 -99 SPO 1997 04 02 18 00 34 5.2 -9 678.80 -57.6 -57.9 -57.7 60 0 SPO 1997 04 02 18 01 36 5.0 -9 678.80 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 18 02 36 5.0 -9 678.80 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 03 35 5.0 -9 678.80 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 04 35 5.5 -9 678.80 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 05 37 5.3 -9 678.80 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 06 36 5.4 -9 678.80 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 07 36 5.0 -9 678.80 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 08 36 5.4 -9 678.80 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 09 35 5.3 -9 678.80 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 10 36 5.4 -9 678.80 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 11 37 5.2 -9 678.80 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 18 12 37 5.2 -9 678.80 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 18 13 37 4.8 -9 678.90 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 18 14 38 5.2 -9 678.90 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 18 15 38 4.8 -9 678.90 -57.6 -57.9 -57.7 60 -99 SPO 1997 04 02 18 16 38 4.8 -9 678.90 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 17 37 4.8 -9 678.90 -57.6 -58.0 -57.7 62 -99 SPO 1997 04 02 18 18 37 5.1 -9 678.90 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 19 37 4.9 -9 678.90 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 20 37 5.3 -9 678.90 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 21 38 4.9 -9 678.90 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 22 40 4.8 -9 678.90 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 23 38 5.0 -9 678.90 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 24 38 5.2 -9 678.90 -57.6 -57.9 -57.7 62 -99 SPO 1997 04 02 18 25 37 4.8 -9 679.00 -57.6 -57.9 -57.7 63 -99 SPO 1997 04 02 18 26 37 5.0 -9 679.00 -57.6 -57.9 -57.6 63 -99 SPO 1997 04 02 18 27 37 4.5 -9 679.00 -57.6 -57.9 -57.6 63 -99 SPO 1997 04 02 18 28 37 4.8 -9 679.00 -57.6 -57.9 -57.6 63 -99 SPO 1997 04 02 18 29 36 4.7 -9 679.00 -57.5 -57.8 -57.6 63 -99 SPO 1997 04 02 18 30 36 4.7 -9 679.00 -57.5 -57.8 -57.6 62 -99 SPO 1997 04 02 18 31 35 4.8 -9 679.00 -57.5 -57.8 -57.6 62 -99 SPO 1997 04 02 18 32 35 4.3 -9 679.00 -57.5 -57.8 -57.6 62 -99 SPO 1997 04 02 18 33 35 4.3 -9 679.10 -57.5 -57.8 -57.6 62 -99 SPO 1997 04 02 18 34 36 4.5 -9 679.10 -57.5 -57.9 -57.6 62 -99 SPO 1997 04 02 18 35 37 4.4 -9 679.10 -57.5 -57.9 -57.6 62 -99 SPO 1997 04 02 18 36 33 4.8 -9 679.10 -57.5 -57.8 -57.6 63 -99 SPO 1997 04 02 18 37 35 4.3 -9 679.10 -57.5 -57.8 -57.6 63 -99 SPO 1997 04 02 18 38 36 4.4 -9 679.10 -57.5 -57.8 -57.6 63 -99 SPO 1997 04 02 18 39 35 4.2 -9 679.10 -57.5 -57.8 -57.5 63 -99 SPO 1997 04 02 18 40 36 4.5 -9 679.10 -57.5 -57.8 -57.5 63 -99 SPO 1997 04 02 18 41 34 4.6 -9 679.10 -57.4 -57.8 -57.5 62 -99 SPO 1997 04 02 18 42 36 4.5 -9 679.10 -57.4 -57.8 -57.5 63 -99 SPO 1997 04 02 18 43 35 4.5 -9 679.20 -57.4 -57.7 -57.5 63 -99 SPO 1997 04 02 18 44 33 4.4 -9 679.20 -57.4 -57.7 -57.5 63 -99 SPO 1997 04 02 18 45 35 4.3 -9 679.20 -57.4 -57.7 -57.5 63 -99 SPO 1997 04 02 18 46 33 4.7 -9 679.20 -57.4 -57.7 -57.5 62 -99 SPO 1997 04 02 18 47 32 4.5 -9 679.20 -57.4 -57.7 -57.5 62 -99 SPO 1997 04 02 18 48 32 4.3 -9 679.20 -57.4 -57.7 -57.5 62 -99 SPO 1997 04 02 18 49 32 4.3 -9 679.20 -57.4 -57.7 -57.5 63 -99 SPO 1997 04 02 18 50 34 4.5 -9 679.30 -57.4 -57.8 -57.4 63 -99 SPO 1997 04 02 18 51 35 4.5 -9 679.30 -57.3 -57.8 -57.5 62 -99 SPO 1997 04 02 18 52 35 4.2 -9 679.30 -57.3 -57.7 -57.4 63 -99 SPO 1997 04 02 18 53 36 4.3 -9 679.30 -57.3 -57.7 -57.4 62 -99 SPO 1997 04 02 18 54 36 4.3 -9 679.30 -57.3 -57.7 -57.4 62 -99 SPO 1997 04 02 18 55 36 4.3 -9 679.30 -57.3 -57.7 -57.4 61 -99 SPO 1997 04 02 18 56 35 4.5 -9 679.30 -57.3 -57.6 -57.4 61 -99 SPO 1997 04 02 18 57 34 4.6 -9 679.30 -57.3 -57.6 -57.4 61 -99 SPO 1997 04 02 18 58 35 4.4 -9 679.30 -57.3 -57.6 -57.4 61 -99 SPO 1997 04 02 18 59 36 4.5 -9 679.30 -57.3 -57.6 -57.4 61 -99 SPO 1997 04 02 19 00 36 4.1 -9 679.30 -57.3 -57.5 -57.4 62 0 SPO 1997 04 02 19 01 35 4.0 -9 679.30 -57.3 -57.5 -57.4 63 -99 SPO 1997 04 02 19 02 36 4.5 -9 679.30 -57.3 -57.5 -57.3 63 -99 SPO 1997 04 02 19 03 36 4.4 -9 679.30 -57.3 -57.5 -57.3 63 -99 SPO 1997 04 02 19 04 35 4.3 -9 679.40 -57.2 -57.5 -57.3 62 -99 SPO 1997 04 02 19 05 36 4.0 -9 679.40 -57.2 -57.6 -57.3 62 -99 SPO 1997 04 02 19 06 37 4.1 -9 679.40 -57.2 -57.6 -57.3 62 -99 SPO 1997 04 02 19 07 37 4.5 -9 679.40 -57.2 -57.6 -57.3 61 -99 SPO 1997 04 02 19 08 36 4.3 -9 679.40 -57.2 -57.6 -57.3 61 -99 SPO 1997 04 02 19 09 38 3.9 -9 679.40 -57.2 -57.6 -57.3 61 -99 SPO 1997 04 02 19 10 37 4.1 -9 679.40 -57.2 -57.5 -57.3 61 -99 SPO 1997 04 02 19 11 37 4.4 -9 679.40 -57.2 -57.5 -57.3 61 -99 SPO 1997 04 02 19 12 37 4.5 -9 679.40 -57.2 -57.5 -57.3 62 -99 SPO 1997 04 02 19 13 38 4.3 -9 679.40 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 02 19 14 36 4.5 -9 679.40 -57.2 -57.4 -57.2 63 -99 SPO 1997 04 02 19 15 37 4.7 -9 679.40 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 16 38 4.4 -9 679.40 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 17 37 4.5 -9 679.40 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 18 38 4.4 -9 679.40 -57.1 -57.3 -57.2 62 -99 SPO 1997 04 02 19 19 38 4.5 -9 679.40 -57.1 -57.3 -57.2 61 -99 SPO 1997 04 02 19 20 38 4.6 -9 679.40 -57.1 -57.3 -57.2 61 -99 SPO 1997 04 02 19 21 38 4.3 -9 679.40 -57.1 -57.4 -57.2 61 -99 SPO 1997 04 02 19 22 38 4.3 -9 679.50 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 23 38 4.3 -9 679.50 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 24 36 4.5 -9 679.50 -57.0 -57.4 -57.2 62 -99 SPO 1997 04 02 19 25 36 4.7 -9 679.50 -57.0 -57.4 -57.2 62 -99 SPO 1997 04 02 19 26 37 4.5 -9 679.50 -57.0 -57.4 -57.2 62 -99 SPO 1997 04 02 19 27 38 4.7 -9 679.50 -57.0 -57.3 -57.2 63 -99 SPO 1997 04 02 19 28 38 4.6 -9 679.50 -57.0 -57.3 -57.1 63 -99 SPO 1997 04 02 19 29 37 4.4 -9 679.50 -57.0 -57.3 -57.1 63 -99 SPO 1997 04 02 19 30 37 4.7 -9 679.60 -57.0 -57.3 -57.1 63 -99 SPO 1997 04 02 19 31 38 4.5 -9 679.60 -57.0 -57.3 -57.1 62 -99 SPO 1997 04 02 19 32 38 4.4 -9 679.60 -57.0 -57.3 -57.1 61 -99 SPO 1997 04 02 19 33 35 4.2 -9 679.60 -57.0 -57.3 -57.1 61 -99 SPO 1997 04 02 19 34 35 4.1 -9 679.60 -57.0 -57.3 -57.1 61 -99 SPO 1997 04 02 19 35 35 4.5 -9 679.60 -57.0 -57.3 -57.1 61 -99 SPO 1997 04 02 19 36 35 4.2 -9 679.60 -57.0 -57.3 -57.1 61 -99 SPO 1997 04 02 19 37 35 4.0 -9 679.60 -57.1 -57.3 -57.2 63 -99 SPO 1997 04 02 19 38 35 4.3 -9 679.60 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 39 34 4.2 -9 679.70 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 40 36 4.1 -9 679.70 -57.0 -57.4 -57.2 62 -99 SPO 1997 04 02 19 41 35 4.1 -9 679.70 -57.0 -57.4 -57.2 62 -99 SPO 1997 04 02 19 42 36 4.4 -9 679.70 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 43 35 4.6 -9 679.70 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 44 36 4.2 -9 679.70 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 45 35 4.2 -9 679.70 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 46 36 4.3 -9 679.70 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 47 36 4.3 -9 679.70 -57.1 -57.3 -57.2 63 -99 SPO 1997 04 02 19 48 37 4.3 -9 679.70 -57.1 -57.3 -57.2 63 -99 SPO 1997 04 02 19 49 36 4.5 -9 679.70 -57.1 -57.3 -57.2 63 -99 SPO 1997 04 02 19 50 36 4.6 -9 679.70 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 51 35 4.5 -9 679.70 -57.1 -57.4 -57.2 63 -99 SPO 1997 04 02 19 52 34 4.2 -9 679.70 -57.1 -57.4 -57.2 62 -99 SPO 1997 04 02 19 53 35 4.1 -9 679.70 -57.1 -57.4 -57.2 61 -99 SPO 1997 04 02 19 54 37 3.6 -9 679.70 -57.2 -57.4 -57.2 62 -99 SPO 1997 04 02 19 55 38 4.2 -9 679.80 -57.2 -57.4 -57.2 62 -99 SPO 1997 04 02 19 56 39 4.0 -9 679.80 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 02 19 57 38 4.1 -9 679.80 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 02 19 58 37 4.4 -9 679.70 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 02 19 59 37 4.2 -9 679.80 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 02 20 00 37 4.0 -9 679.80 -57.2 -57.4 -57.2 63 0 SPO 1997 04 02 20 01 36 3.9 -9 679.80 -57.2 -57.4 -57.2 63 -99 SPO 1997 04 02 20 02 37 3.6 -9 679.80 -57.2 -57.4 -57.2 63 -99 SPO 1997 04 02 20 03 36 3.8 -9 679.80 -57.2 -57.4 -57.2 63 -99 SPO 1997 04 02 20 04 37 3.7 -9 679.80 -57.2 -57.4 -57.3 63 -99 SPO 1997 04 02 20 05 38 4.1 -9 679.80 -57.2 -57.4 -57.2 62 -99 SPO 1997 04 02 20 06 38 4.0 -9 679.90 -57.2 -57.4 -57.2 62 -99 SPO 1997 04 02 20 07 37 4.0 -9 679.80 -57.2 -57.4 -57.2 61 -99 SPO 1997 04 02 20 08 37 3.9 -9 679.80 -57.2 -57.4 -57.2 61 -99 SPO 1997 04 02 20 09 38 3.9 -9 679.80 -57.2 -57.4 -57.2 62 -99 SPO 1997 04 02 20 10 39 3.7 -9 679.80 -57.2 -57.4 -57.2 62 -99 SPO 1997 04 02 20 11 38 3.9 -9 679.80 -57.2 -57.5 -57.3 62 -99 SPO 1997 04 02 20 12 39 3.9 -9 679.80 -57.2 -57.5 -57.3 62 -99 SPO 1997 04 02 20 13 39 3.9 -9 679.80 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 02 20 14 39 3.9 -9 679.80 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 02 20 15 39 3.8 -9 679.80 -57.2 -57.4 -57.3 62 -99 SPO 1997 04 02 20 16 39 3.8 -9 679.90 -57.2 -57.4 -57.3 61 -99 SPO 1997 04 02 20 17 40 3.8 -9 679.90 -57.2 -57.4 -57.3 61 -99 SPO 1997 04 02 20 18 41 3.6 -9 679.90 -57.2 -57.4 -57.3 61 -99 SPO 1997 04 02 20 19 43 3.6 -9 680.00 -57.2 -57.3 -57.3 61 -99 SPO 1997 04 02 20 20 44 3.6 -9 680.00 -57.2 -57.3 -57.3 61 -99 SPO 1997 04 02 20 21 43 3.7 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 22 45 3.3 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 23 45 3.4 -9 680.00 -57.2 -57.3 -57.3 61 -99 SPO 1997 04 02 20 24 45 3.5 -9 680.00 -57.2 -57.2 -57.3 61 -99 SPO 1997 04 02 20 25 45 3.5 -9 680.00 -57.2 -57.2 -57.3 62 -99 SPO 1997 04 02 20 26 45 3.6 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 27 45 3.4 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 28 44 3.5 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 29 43 3.7 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 30 44 3.6 -9 680.00 -57.2 -57.3 -57.3 62 -99 SPO 1997 04 02 20 31 43 3.7 -9 680.00 -57.2 -57.2 -57.3 62 -99 SPO 1997 04 02 20 32 44 3.9 -9 680.00 -57.2 -57.2 -57.3 62 -99 SPO 1997 04 02 20 33 45 4.0 -9 680.00 -57.2 -57.2 -57.3 63 -99 SPO 1997 04 02 20 34 46 4.0 -9 680.00 -57.2 -57.2 -57.2 63 -99 SPO 1997 04 02 20 35 46 3.8 -9 680.00 -57.2 -57.1 -57.2 63 -99 SPO 1997 04 02 20 36 46 3.6 -9 680.00 -57.1 -57.1 -57.2 62 -99 SPO 1997 04 02 20 37 47 3.5 -9 680.10 -57.1 -57.0 -57.2 62 -99 SPO 1997 04 02 20 38 47 3.4 -9 680.10 -57.2 -57.0 -57.3 62 -99 SPO 1997 04 02 20 39 46 3.5 -9 680.10 -57.2 -57.0 -57.2 62 -99 SPO 1997 04 02 20 40 46 3.5 -9 680.10 -57.2 -57.0 -57.2 61 -99 SPO 1997 04 02 20 41 47 3.6 -9 680.10 -57.1 -57.0 -57.2 60 -99 SPO 1997 04 02 20 42 49 3.5 -9 680.10 -57.1 -57.0 -57.2 60 -99 SPO 1997 04 02 20 43 46 3.7 -9 680.10 -57.2 -57.1 -57.2 61 -99 SPO 1997 04 02 20 44 47 3.7 -9 680.10 -57.2 -57.1 -57.3 62 -99 SPO 1997 04 02 20 45 48 3.7 -9 680.10 -57.2 -57.1 -57.3 62 -99 SPO 1997 04 02 20 46 49 3.8 -9 680.10 -57.2 -57.1 -57.3 63 -99 SPO 1997 04 02 20 47 49 3.7 -9 680.10 -57.2 -57.1 -57.3 63 -99 SPO 1997 04 02 20 48 51 3.5 -9 680.10 -57.2 -57.1 -57.3 63 -99 SPO 1997 04 02 20 49 53 3.5 -9 680.10 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 02 20 50 54 3.5 -9 680.20 -57.2 -57.0 -57.3 63 -99 SPO 1997 04 02 20 51 56 3.5 -9 680.20 -57.2 -57.1 -57.3 62 -99 SPO 1997 04 02 20 52 55 3.6 -9 680.20 -57.2 -57.1 -57.3 61 -99 SPO 1997 04 02 20 53 54 3.7 -9 680.20 -57.3 -57.1 -57.3 62 -99 SPO 1997 04 02 20 54 53 3.8 -9 680.20 -57.3 -57.1 -57.3 62 -99 SPO 1997 04 02 20 55 53 3.8 -9 680.20 -57.3 -57.1 -57.3 62 -99 SPO 1997 04 02 20 56 51 3.9 -9 680.10 -57.3 -57.0 -57.3 62 -99 SPO 1997 04 02 20 57 51 4.0 -9 680.20 -57.3 -57.0 -57.3 62 -99 SPO 1997 04 02 20 58 51 4.0 -9 680.20 -57.2 -57.0 -57.3 61 -99 SPO 1997 04 02 20 59 51 4.1 -9 680.20 -57.2 -57.0 -57.3 61 -99 SPO 1997 04 02 21 00 52 4.1 -9 680.20 -57.2 -57.1 -57.3 62 0 SPO 1997 04 02 21 01 52 3.6 -9 680.20 -57.3 -57.1 -57.3 63 -99 SPO 1997 04 02 21 02 52 3.7 -9 680.20 -57.3 -57.2 -57.3 63 -99 SPO 1997 04 02 21 03 54 4.0 -9 680.30 -57.3 -57.2 -57.3 63 -99 SPO 1997 04 02 21 04 52 3.8 -9 680.20 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 02 21 05 52 3.8 -9 680.20 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 02 21 06 54 4.0 -9 680.20 -57.3 -57.0 -57.4 62 -99 SPO 1997 04 02 21 07 51 4.0 -9 680.20 -57.3 -57.0 -57.4 62 -99 SPO 1997 04 02 21 08 53 4.1 -9 680.20 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 02 21 09 50 4.2 -9 680.20 -57.4 -57.1 -57.4 63 -99 SPO 1997 04 02 21 10 52 4.0 -9 680.20 -57.3 -57.1 -57.4 62 -99 SPO 1997 04 02 21 11 48 3.9 -9 680.20 -57.4 -57.2 -57.4 63 -99 SPO 1997 04 02 21 12 50 3.7 -9 680.20 -57.4 -57.1 -57.4 63 -99 SPO 1997 04 02 21 13 51 3.9 -9 680.30 -57.4 -57.2 -57.4 62 -99 SPO 1997 04 02 21 14 50 4.0 -9 680.30 -57.4 -57.1 -57.4 61 -99 SPO 1997 04 02 21 15 50 3.8 -9 680.30 -57.4 -57.2 -57.4 61 -99 SPO 1997 04 02 21 16 53 3.8 -9 680.30 -57.4 -57.3 -57.4 61 -99 SPO 1997 04 02 21 17 54 3.5 -9 680.30 -57.4 -57.2 -57.5 61 -99 SPO 1997 04 02 21 18 56 3.3 -9 680.30 -57.4 -57.3 -57.5 61 -99 SPO 1997 04 02 21 19 57 3.5 -9 680.30 -57.5 -57.4 -57.6 62 -99 SPO 1997 04 02 21 20 60 3.3 -9 680.40 -57.5 -57.4 -57.6 62 -99 SPO 1997 04 02 21 21 58 3.4 -9 680.40 -57.6 -57.6 -57.6 63 -99 SPO 1997 04 02 21 22 59 3.5 -9 680.40 -57.6 -57.7 -57.7 62 -99 SPO 1997 04 02 21 23 58 3.6 -9 680.40 -57.6 -57.7 -57.7 62 -99 SPO 1997 04 02 21 24 58 3.6 -9 680.40 -57.7 -57.7 -57.7 61 -99 SPO 1997 04 02 21 25 56 3.6 -9 680.40 -57.7 -57.7 -57.7 61 -99 SPO 1997 04 02 21 26 57 3.6 -9 680.40 -57.7 -57.7 -57.7 60 -99 SPO 1997 04 02 21 27 57 3.8 -9 680.40 -57.7 -57.7 -57.8 59 -99 SPO 1997 04 02 21 28 56 3.6 -9 680.40 -57.7 -57.7 -57.8 59 -99 SPO 1997 04 02 21 29 56 3.4 -9 680.40 -57.8 -57.7 -57.8 59 -99 SPO 1997 04 02 21 30 54 3.3 -9 680.40 -57.8 -57.8 -57.8 59 -99 SPO 1997 04 02 21 31 53 3.3 -9 680.40 -57.8 -57.8 -57.8 59 -99 SPO 1997 04 02 21 32 55 3.5 -9 680.40 -57.8 -57.8 -57.9 59 -99 SPO 1997 04 02 21 33 55 3.5 -9 680.40 -57.8 -57.9 -57.9 60 -99 SPO 1997 04 02 21 34 56 3.5 -9 680.50 -57.9 -57.9 -57.9 62 -99 SPO 1997 04 02 21 35 59 3.2 -9 680.50 -57.9 -57.9 -57.9 62 -99 SPO 1997 04 02 21 36 59 3.0 -9 680.50 -57.9 -57.9 -57.9 62 -99 SPO 1997 04 02 21 37 58 2.9 -9 680.50 -57.9 -57.9 -57.9 61 -99 SPO 1997 04 02 21 38 57 3.1 -9 680.50 -57.9 -57.9 -57.9 61 -99 SPO 1997 04 02 21 39 56 3.1 -9 680.50 -57.9 -57.9 -57.9 60 -99 SPO 1997 04 02 21 40 54 3.2 -9 680.50 -57.9 -57.9 -58.0 60 -99 SPO 1997 04 02 21 41 56 3.3 -9 680.50 -57.9 -57.9 -58.0 59 -99 SPO 1997 04 02 21 42 56 3.3 -9 680.50 -58.0 -57.9 -58.0 60 -99 SPO 1997 04 02 21 43 57 3.3 -9 680.50 -58.0 -57.9 -58.0 60 -99 SPO 1997 04 02 21 44 57 3.3 -9 680.50 -58.0 -57.9 -58.0 60 -99 SPO 1997 04 02 21 45 57 3.4 -9 680.50 -58.0 -57.9 -58.0 60 -99 SPO 1997 04 02 21 46 57 3.5 -9 680.50 -58.0 -57.9 -58.1 60 -99 SPO 1997 04 02 21 47 56 3.6 -9 680.50 -58.0 -57.9 -58.1 60 -99 SPO 1997 04 02 21 48 56 3.8 -9 680.50 -58.1 -58.0 -58.1 61 -99 SPO 1997 04 02 21 49 56 3.9 -9 680.50 -58.1 -58.0 -58.1 61 -99 SPO 1997 04 02 21 50 54 4.0 -9 680.50 -58.1 -58.0 -58.2 61 -99 SPO 1997 04 02 21 51 54 4.0 -9 680.50 -58.1 -58.0 -58.2 60 -99 SPO 1997 04 02 21 52 55 4.1 -9 680.50 -58.2 -58.0 -58.2 61 -99 SPO 1997 04 02 21 53 57 4.0 -9 680.60 -58.2 -58.1 -58.2 60 -99 SPO 1997 04 02 21 54 57 3.8 -9 680.60 -58.2 -58.1 -58.2 60 -99 SPO 1997 04 02 21 55 58 3.7 -9 680.60 -58.2 -58.1 -58.3 60 -99 SPO 1997 04 02 21 56 57 3.9 -9 680.60 -58.2 -58.1 -58.3 60 -99 SPO 1997 04 02 21 57 57 3.8 -9 680.60 -58.3 -58.1 -58.3 62 -99 SPO 1997 04 02 21 58 57 3.8 -9 680.60 -58.3 -58.1 -58.3 62 -99 SPO 1997 04 02 21 59 57 3.7 -9 680.60 -58.3 -58.1 -58.4 62 -99 SPO 1997 04 02 22 00 57 3.7 -9 680.60 -58.3 -58.1 -58.4 61 0 SPO 1997 04 02 22 01 58 3.6 -9 680.60 -58.3 -58.1 -58.4 61 -99 SPO 1997 04 02 22 02 57 3.7 -9 680.60 -58.4 -58.1 -58.4 61 -99 SPO 1997 04 02 22 03 58 3.8 -9 680.60 -58.4 -58.2 -58.4 60 -99 SPO 1997 04 02 22 04 57 3.8 -9 680.60 -58.4 -58.2 -58.4 60 -99 SPO 1997 04 02 22 05 59 3.7 -9 680.60 -58.4 -58.2 -58.4 60 -99 SPO 1997 04 02 22 06 60 3.6 -9 680.70 -58.4 -58.2 -58.4 60 -99 SPO 1997 04 02 22 07 62 3.4 -9 680.70 -58.4 -58.3 -58.5 59 -99 SPO 1997 04 02 22 08 62 3.1 -9 680.70 -58.5 -58.3 -58.5 60 -99 SPO 1997 04 02 22 09 62 3.1 -9 680.70 -58.5 -58.3 -58.5 60 -99 SPO 1997 04 02 22 10 62 3.2 -9 680.70 -58.5 -58.3 -58.5 61 -99 SPO 1997 04 02 22 11 62 3.0 -9 680.80 -58.5 -58.3 -58.5 60 -99 SPO 1997 04 02 22 12 64 3.0 -9 680.80 -58.5 -58.3 -58.6 60 -99 SPO 1997 04 02 22 13 65 3.2 -9 680.80 -58.5 -58.3 -58.6 60 -99 SPO 1997 04 02 22 14 66 3.1 -9 680.80 -58.6 -58.3 -58.6 61 -99 SPO 1997 04 02 22 15 66 3.2 -9 680.80 -58.6 -58.3 -58.6 60 -99 SPO 1997 04 02 22 16 63 3.5 -9 680.80 -58.6 -58.3 -58.6 59 -99 SPO 1997 04 02 22 17 62 3.6 -9 680.80 -58.6 -58.3 -58.6 58 -99 SPO 1997 04 02 22 18 62 3.8 -9 680.80 -58.6 -58.3 -58.6 58 -99 SPO 1997 04 02 22 19 60 3.8 -9 680.80 -58.6 -58.3 -58.6 58 -99 SPO 1997 04 02 22 20 60 3.8 -9 680.80 -58.6 -58.4 -58.6 59 -99 SPO 1997 04 02 22 21 60 3.9 -9 680.80 -58.6 -58.4 -58.7 59 -99 SPO 1997 04 02 22 22 60 3.7 -9 680.80 -58.6 -58.4 -58.7 60 -99 SPO 1997 04 02 22 23 59 3.6 -9 680.90 -58.6 -58.4 -58.7 60 -99 SPO 1997 04 02 22 24 58 3.6 -9 680.90 -58.7 -58.4 -58.7 61 -99 SPO 1997 04 02 22 25 58 3.6 -9 680.90 -58.7 -58.4 -58.7 60 -99 SPO 1997 04 02 22 26 58 3.9 -9 680.90 -58.6 -58.4 -58.7 59 -99 SPO 1997 04 02 22 27 56 3.9 -9 680.90 -58.6 -58.4 -58.7 59 -99 SPO 1997 04 02 22 28 55 3.8 -9 680.90 -58.7 -58.4 -58.7 60 -99 SPO 1997 04 02 22 29 53 3.9 -9 680.90 -58.7 -58.4 -58.7 60 -99 SPO 1997 04 02 22 30 54 4.1 -9 680.90 -58.7 -58.4 -58.7 59 -99 SPO 1997 04 02 22 31 54 4.0 -9 680.90 -58.7 -58.4 -58.7 60 -99 SPO 1997 04 02 22 32 55 3.9 -9 680.90 -58.7 -58.3 -58.8 60 -99 SPO 1997 04 02 22 33 55 4.0 -9 681.00 -58.7 -58.3 -58.8 60 -99 SPO 1997 04 02 22 34 55 3.7 -9 681.00 -58.7 -58.3 -58.8 60 -99 SPO 1997 04 02 22 35 57 3.7 -9 681.00 -58.7 -58.3 -58.7 59 -99 SPO 1997 04 02 22 36 57 3.6 -9 681.00 -58.7 -58.4 -58.7 60 -99 SPO 1997 04 02 22 37 57 3.4 -9 681.00 -58.7 -58.4 -58.8 59 -99 SPO 1997 04 02 22 38 56 3.4 -9 681.00 -58.8 -58.4 -58.8 60 -99 SPO 1997 04 02 22 39 58 3.4 -9 681.00 -58.8 -58.3 -58.9 59 -99 SPO 1997 04 02 22 40 57 3.4 -9 681.10 -58.8 -58.3 -58.9 59 -99 SPO 1997 04 02 22 41 58 3.4 -9 681.00 -58.8 -58.3 -58.9 58 -99 SPO 1997 04 02 22 42 57 3.5 -9 681.00 -58.9 -58.3 -58.9 59 -99 SPO 1997 04 02 22 43 58 3.5 -9 681.00 -58.9 -58.3 -58.9 60 -99 SPO 1997 04 02 22 44 58 3.5 -9 681.00 -58.9 -58.3 -59.0 60 -99 SPO 1997 04 02 22 45 57 3.5 -9 681.00 -58.9 -58.4 -59.0 60 -99 SPO 1997 04 02 22 46 58 3.4 -9 681.00 -58.9 -58.4 -59.0 61 -99 SPO 1997 04 02 22 47 58 3.5 -9 681.00 -59.0 -58.4 -59.0 61 -99 SPO 1997 04 02 22 48 57 3.4 -9 681.00 -59.0 -58.4 -59.0 61 -99 SPO 1997 04 02 22 49 57 3.5 -9 681.00 -59.0 -58.5 -59.1 60 -99 SPO 1997 04 02 22 50 54 3.8 -9 681.00 -59.0 -58.5 -59.1 59 -99 SPO 1997 04 02 22 51 52 4.0 -9 681.00 -59.0 -58.5 -59.0 58 -99 SPO 1997 04 02 22 52 51 4.3 -9 681.00 -59.0 -58.5 -59.0 58 -99 SPO 1997 04 02 22 53 50 4.4 -9 681.00 -59.0 -58.5 -59.0 58 -99 SPO 1997 04 02 22 54 49 4.4 -9 681.00 -59.0 -58.4 -59.0 59 -99 SPO 1997 04 02 22 55 48 4.4 -9 681.00 -59.0 -58.3 -59.0 59 -99 SPO 1997 04 02 22 56 47 4.5 -9 681.00 -59.0 -58.2 -59.1 60 -99 SPO 1997 04 02 22 57 46 4.4 -9 681.00 -59.0 -58.1 -59.1 60 -99 SPO 1997 04 02 22 58 46 4.2 -9 681.00 -59.0 -58.1 -59.1 61 -99 SPO 1997 04 02 22 59 46 3.9 -9 681.00 -59.0 -58.1 -59.1 61 -99 SPO 1997 04 02 23 00 49 3.7 -9 681.10 -59.0 -58.2 -59.1 61 0 SPO 1997 04 02 23 01 53 3.4 -9 681.10 -59.1 -58.2 -59.2 60 -99 SPO 1997 04 02 23 02 57 3.3 -9 681.20 -59.1 -58.2 -59.2 59 -99 SPO 1997 04 02 23 03 59 3.2 -9 681.20 -59.1 -58.3 -59.2 58 -99 SPO 1997 04 02 23 04 58 3.1 -9 681.20 -59.1 -58.4 -59.2 58 -99 SPO 1997 04 02 23 05 58 3.4 -9 681.20 -59.1 -58.4 -59.2 58 -99 SPO 1997 04 02 23 06 59 3.5 -9 681.10 -59.2 -58.4 -59.2 59 -99 SPO 1997 04 02 23 07 58 3.8 -9 681.10 -59.2 -58.3 -59.2 59 -99 SPO 1997 04 02 23 08 58 3.8 -9 681.10 -59.2 -58.3 -59.2 59 -99 SPO 1997 04 02 23 09 57 4.0 -9 681.10 -59.2 -58.3 -59.2 60 -99 SPO 1997 04 02 23 10 57 4.1 -9 681.10 -59.2 -58.3 -59.3 59 -99 SPO 1997 04 02 23 11 58 4.1 -9 681.10 -59.3 -58.3 -59.3 60 -99 SPO 1997 04 02 23 12 58 4.2 -9 681.10 -59.3 -58.2 -59.3 60 -99 SPO 1997 04 02 23 13 58 4.0 -9 681.10 -59.3 -58.2 -59.3 60 -99 SPO 1997 04 02 23 14 56 4.2 -9 681.10 -59.3 -58.2 -59.3 59 -99 SPO 1997 04 02 23 15 56 4.2 -9 681.10 -59.3 -58.2 -59.3 59 -99 SPO 1997 04 02 23 16 55 4.4 -9 681.10 -59.3 -58.2 -59.3 59 -99 SPO 1997 04 02 23 17 54 4.5 -9 681.10 -59.3 -58.2 -59.3 59 -99 SPO 1997 04 02 23 18 54 4.4 -9 681.10 -59.3 -58.2 -59.3 60 -99 SPO 1997 04 02 23 19 55 4.5 -9 681.10 -59.3 -58.2 -59.3 60 -99 SPO 1997 04 02 23 20 54 4.4 -9 681.10 -59.3 -58.1 -59.3 60 -99 SPO 1997 04 02 23 21 54 4.3 -9 681.10 -59.3 -58.1 -59.3 60 -99 SPO 1997 04 02 23 22 54 4.5 -9 681.20 -59.3 -58.1 -59.4 60 -99 SPO 1997 04 02 23 23 54 4.3 -9 681.20 -59.3 -58.2 -59.3 60 -99 SPO 1997 04 02 23 24 55 4.2 -9 681.10 -59.3 -58.3 -59.3 60 -99 SPO 1997 04 02 23 25 55 4.3 -9 681.10 -59.3 -58.3 -59.4 60 -99 SPO 1997 04 02 23 26 56 4.4 -9 681.10 -59.3 -58.3 -59.4 59 -99 SPO 1997 04 02 23 27 57 4.4 -9 681.10 -59.4 -58.3 -59.4 60 -99 SPO 1997 04 02 23 28 58 4.5 -9 681.10 -59.4 -58.3 -59.4 60 -99 SPO 1997 04 02 23 29 57 4.3 -9 681.10 -59.4 -58.3 -59.4 60 -99 SPO 1997 04 02 23 30 57 4.2 -9 681.10 -59.4 -58.4 -59.5 60 -99 SPO 1997 04 02 23 31 57 4.4 -9 681.10 -59.4 -58.4 -59.5 60 -99 SPO 1997 04 02 23 32 57 4.4 -9 681.10 -59.4 -58.3 -59.5 60 -99 SPO 1997 04 02 23 33 56 4.5 -9 681.10 -59.4 -58.3 -59.5 60 -99 SPO 1997 04 02 23 34 57 4.6 -9 681.10 -59.4 -58.3 -59.5 60 -99 SPO 1997 04 02 23 35 57 4.5 -9 681.10 -59.4 -58.4 -59.4 60 -99 SPO 1997 04 02 23 36 58 4.7 -9 681.10 -59.4 -58.4 -59.4 59 -99 SPO 1997 04 02 23 37 59 4.5 -9 681.10 -59.4 -58.3 -59.4 58 -99 SPO 1997 04 02 23 38 61 4.4 -9 681.10 -59.4 -58.3 -59.5 58 -99 SPO 1997 04 02 23 39 62 4.5 -9 681.10 -59.4 -58.4 -59.5 58 -99 SPO 1997 04 02 23 40 63 4.5 -9 681.10 -59.4 -58.4 -59.5 59 -99 SPO 1997 04 02 23 41 64 4.7 -9 681.10 -59.5 -58.4 -59.5 60 -99 SPO 1997 04 02 23 42 63 4.7 -9 681.10 -59.5 -58.5 -59.6 61 -99 SPO 1997 04 02 23 43 63 4.8 -9 681.10 -59.5 -58.4 -59.6 60 -99 SPO 1997 04 02 23 44 62 5.1 -9 681.10 -59.5 -58.2 -59.6 60 -99 SPO 1997 04 02 23 45 61 5.1 -9 681.10 -59.5 -58.1 -59.6 60 -99 SPO 1997 04 02 23 46 61 5.0 -9 681.10 -59.5 -58.2 -59.6 59 -99 SPO 1997 04 02 23 47 62 5.1 -9 681.20 -59.5 -58.2 -59.6 58 -99 SPO 1997 04 02 23 48 61 4.7 -9 681.20 -59.5 -58.2 -59.6 58 -99 SPO 1997 04 02 23 49 61 4.7 -9 681.20 -59.5 -58.4 -59.6 58 -99 SPO 1997 04 02 23 50 62 4.8 -9 681.20 -59.5 -58.5 -59.6 57 -99 SPO 1997 04 02 23 51 61 4.7 -9 681.20 -59.6 -58.6 -59.6 57 -99 SPO 1997 04 02 23 52 61 4.5 -9 681.20 -59.6 -58.5 -59.6 57 -99 SPO 1997 04 02 23 53 62 4.5 -9 681.20 -59.6 -58.6 -59.6 58 -99 SPO 1997 04 02 23 54 60 4.3 -9 681.20 -59.6 -58.5 -59.6 58 -99 SPO 1997 04 02 23 55 60 4.3 -9 681.20 -59.6 -58.7 -59.6 58 -99 SPO 1997 04 02 23 56 60 4.5 -9 681.20 -59.6 -58.7 -59.7 59 -99 SPO 1997 04 02 23 57 62 4.6 -9 681.20 -59.6 -58.6 -59.7 59 -99 SPO 1997 04 02 23 58 63 4.4 -9 681.20 -59.6 -58.6 -59.7 -99 -99 SPO 1997 04 02 23 59 65 4.2 -9 681.20 -59.6 -58.5 -59.7 -99 -99 SPO 1997 04 03 00 00 64 4.4 -9 681.20 -59.7 -58.6 -59.7 -99 0 SPO 1997 04 03 00 01 64 4.5 -9 681.30 -59.7 -58.6 -59.7 -99 -99 SPO 1997 04 03 00 02 65 4.6 -9 681.30 -59.7 -58.5 -59.8 -99 -99 SPO 1997 04 03 00 03 65 4.7 -9 681.30 -59.7 -58.5 -59.8 -99 -99 SPO 1997 04 03 00 04 65 4.7 -9 681.20 -59.7 -58.4 -59.8 -99 -99 SPO 1997 04 03 00 05 65 4.8 -9 681.30 -59.7 -58.4 -59.8 -99 -99 SPO 1997 04 03 00 06 65 4.8 -9 681.30 -59.8 -58.3 -59.8 -99 -99 SPO 1997 04 03 00 07 65 4.8 -9 681.30 -59.8 -58.3 -59.8 -99 -99 SPO 1997 04 03 00 08 65 4.8 -9 681.30 -59.8 -58.3 -59.9 -99 -99 SPO 1997 04 03 00 09 66 4.6 -9 681.30 -59.8 -58.3 -59.9 -99 -99 SPO 1997 04 03 00 10 67 4.5 -9 681.30 -59.9 -58.4 -60.0 -99 -99 SPO 1997 04 03 00 11 68 4.5 -9 681.30 -59.9 -58.4 -60.0 -99 -99 SPO 1997 04 03 00 12 69 4.5 -9 681.30 -60.0 -58.4 -60.1 -99 -99 SPO 1997 04 03 00 13 72 4.2 -9 681.30 -60.1 -58.5 -60.2 59 -99 SPO 1997 04 03 00 14 75 4.0 -9 681.30 -60.2 -58.5 -60.2 59 -99 SPO 1997 04 03 00 15 75 4.0 -9 681.40 -60.2 -58.5 -60.3 58 -99 SPO 1997 04 03 00 16 75 4.0 -9 681.40 -60.4 -58.5 -60.4 60 -99 SPO 1997 04 03 00 17 74 4.2 -9 681.40 -60.4 -58.4 -60.5 60 -99 SPO 1997 04 03 00 18 73 4.3 -9 681.40 -60.5 -58.3 -60.5 60 -99 SPO 1997 04 03 00 19 72 4.4 -9 681.40 -60.6 -58.2 -60.6 60 -99 SPO 1997 04 03 00 20 74 4.2 -9 681.40 -60.6 -58.1 -60.6 59 -99 SPO 1997 04 03 00 21 74 4.2 -9 681.40 -60.7 -58.1 -60.7 59 -99 SPO 1997 04 03 00 22 73 4.4 -9 681.40 -60.7 -58.1 -60.8 59 -99 SPO 1997 04 03 00 23 72 4.6 -9 681.40 -60.8 -58.0 -60.8 59 -99 SPO 1997 04 03 00 24 74 4.4 -9 681.40 -60.8 -58.0 -60.8 59 -99 SPO 1997 04 03 00 25 75 4.3 -9 681.40 -60.9 -58.0 -60.9 59 -99 SPO 1997 04 03 00 26 76 4.3 -9 681.40 -60.9 -58.0 -60.9 57 -99 SPO 1997 04 03 00 27 74 4.3 -9 681.40 -61.0 -58.0 -60.9 58 -99 SPO 1997 04 03 00 28 72 4.7 -9 681.30 -61.0 -58.0 -61.0 59 -99 SPO 1997 04 03 00 29 71 4.8 -9 681.30 -61.0 -58.0 -61.0 59 -99 SPO 1997 04 03 00 30 72 4.9 -9 681.30 -61.0 -57.9 -61.0 59 -99 SPO 1997 04 03 00 31 73 4.9 -9 681.40 -61.1 -57.8 -61.1 60 -99 SPO 1997 04 03 00 32 75 4.7 -9 681.40 -61.1 -57.9 -61.1 60 -99 SPO 1997 04 03 00 33 77 4.8 -9 681.40 -61.0 -57.9 -61.1 59 -99 SPO 1997 04 03 00 34 78 4.8 -9 681.40 -61.0 -58.0 -61.1 58 -99 SPO 1997 04 03 00 35 77 4.8 -9 681.40 -61.1 -58.0 -61.1 59 -99 SPO 1997 04 03 00 36 75 4.8 -9 681.40 -61.0 -58.0 -61.1 58 -99 SPO 1997 04 03 00 37 74 4.9 -9 681.40 -61.0 -58.0 -61.1 57 -99 SPO 1997 04 03 00 38 74 4.9 -9 681.40 -61.0 -57.9 -61.1 57 -99 SPO 1997 04 03 00 39 74 4.7 -9 681.40 -61.0 -57.9 -61.0 58 -99 SPO 1997 04 03 00 40 75 4.7 -9 681.40 -61.0 -57.9 -61.1 57 -99 SPO 1997 04 03 00 41 75 4.7 -9 681.40 -61.1 -58.0 -61.1 58 -99 SPO 1997 04 03 00 42 76 4.7 -9 681.40 -61.1 -57.9 -61.1 58 -99 SPO 1997 04 03 00 43 77 4.6 -9 681.40 -61.1 -58.0 -61.1 59 -99 SPO 1997 04 03 00 44 78 4.5 -9 681.40 -61.1 -58.0 -61.2 59 -99 SPO 1997 04 03 00 45 79 4.4 -9 681.40 -61.2 -58.0 -61.2 59 -99 SPO 1997 04 03 00 46 79 4.4 -9 681.40 -61.2 -58.1 -61.2 59 -99 SPO 1997 04 03 00 47 79 4.5 -9 681.40 -61.2 -58.1 -61.2 59 -99 SPO 1997 04 03 00 48 78 4.6 -9 681.40 -61.2 -58.1 -61.2 59 -99 SPO 1997 04 03 00 49 78 4.6 -9 681.40 -61.2 -58.1 -61.2 59 -99 SPO 1997 04 03 00 50 76 4.8 -9 681.40 -61.1 -58.0 -61.2 58 -99 SPO 1997 04 03 00 51 75 4.9 -9 681.40 -61.1 -57.9 -61.2 59 -99 SPO 1997 04 03 00 52 75 5.1 -9 681.40 -61.1 -57.8 -61.2 59 -99 SPO 1997 04 03 00 53 74 5.1 -9 681.40 -61.1 -57.7 -61.1 59 -99 SPO 1997 04 03 00 54 74 5.2 -9 681.40 -61.1 -57.7 -61.1 59 -99 SPO 1997 04 03 00 55 74 5.2 -9 681.40 -61.0 -57.6 -61.1 59 -99 SPO 1997 04 03 00 56 73 5.3 -9 681.40 -61.0 -57.6 -61.1 58 -99 SPO 1997 04 03 00 57 73 5.3 -9 681.40 -61.0 -57.6 -61.1 57 -99 SPO 1997 04 03 00 58 74 5.4 -9 681.40 -61.0 -57.7 -61.1 57 -99 SPO 1997 04 03 00 59 73 5.5 -9 681.40 -61.1 -57.7 -61.2 58 -99 SPO 1997 04 03 01 00 72 5.6 -9 681.40 -61.1 -57.8 -61.2 58 0 SPO 1997 04 03 01 01 72 5.6 -9 681.40 -61.1 -57.6 -61.2 58 -99 SPO 1997 04 03 01 02 71 5.6 -9 681.40 -61.1 -57.5 -61.2 59 -99 SPO 1997 04 03 01 03 71 5.7 -9 681.40 -61.1 -57.4 -61.2 59 -99 SPO 1997 04 03 01 04 71 5.7 -9 681.40 -61.1 -57.4 -61.2 60 -99 SPO 1997 04 03 01 05 70 5.7 -9 681.40 -61.1 -57.3 -61.1 60 -99 SPO 1997 04 03 01 06 69 5.5 -9 681.40 -61.1 -57.3 -61.1 61 -99 SPO 1997 04 03 01 07 70 5.5 -9 681.40 -61.0 -57.3 -61.2 60 -99 SPO 1997 04 03 01 08 71 5.4 -9 681.40 -61.0 -57.3 -61.1 60 -99 SPO 1997 04 03 01 09 72 5.4 -9 681.40 -61.1 -57.3 -61.1 60 -99 SPO 1997 04 03 01 10 73 5.4 -9 681.40 -61.1 -57.3 -61.2 59 -99 SPO 1997 04 03 01 11 75 5.3 -9 681.40 -61.0 -57.3 -61.2 58 -99 SPO 1997 04 03 01 12 76 5.3 -9 681.40 -61.1 -57.3 -61.2 58 -99 SPO 1997 04 03 01 13 76 5.3 -9 681.40 -61.1 -57.3 -61.2 59 -99 SPO 1997 04 03 01 14 76 5.3 -9 681.50 -61.1 -57.3 -61.2 59 -99 SPO 1997 04 03 01 15 77 5.3 -9 681.40 -61.1 -57.3 -61.2 59 -99 SPO 1997 04 03 01 16 77 5.3 -9 681.40 -61.2 -57.3 -61.2 59 -99 SPO 1997 04 03 01 17 77 5.4 -9 681.50 -61.2 -57.3 -61.3 59 -99 SPO 1997 04 03 01 18 78 5.4 -9 681.50 -61.2 -57.4 -61.3 59 -99 SPO 1997 04 03 01 19 77 5.5 -9 681.50 -61.2 -57.5 -61.3 59 -99 SPO 1997 04 03 01 20 76 5.6 -9 681.50 -61.2 -57.4 -61.3 58 -99 SPO 1997 04 03 01 21 76 5.6 -9 681.50 -61.2 -57.4 -61.3 58 -99 SPO 1997 04 03 01 22 75 5.7 -9 681.50 -61.2 -57.4 -61.3 58 -99 SPO 1997 04 03 01 23 75 5.8 -9 681.50 -61.2 -57.5 -61.3 58 -99 SPO 1997 04 03 01 24 75 5.9 -9 681.50 -61.3 -57.6 -61.3 59 -99 SPO 1997 04 03 01 25 74 6.0 -9 681.40 -61.2 -57.4 -61.3 58 -99 SPO 1997 04 03 01 26 74 6.1 -9 681.40 -61.2 -57.4 -61.3 58 -99 SPO 1997 04 03 01 27 73 6.1 -9 681.40 -61.2 -57.4 -61.2 59 -99 SPO 1997 04 03 01 28 72 6.1 -9 681.40 -61.2 -57.4 -61.2 59 -99 SPO 1997 04 03 01 29 71 6.2 -9 681.40 -61.2 -57.4 -61.2 61 -99 SPO 1997 04 03 01 30 70 6.2 -9 681.40 -61.2 -57.1 -61.2 61 -99 SPO 1997 04 03 01 31 70 6.1 -9 681.40 -61.2 -56.9 -61.2 61 -99 SPO 1997 04 03 01 32 71 6.1 -9 681.40 -61.2 -56.9 -61.2 59 -99 SPO 1997 04 03 01 33 70 6.2 -9 681.40 -61.2 -57.0 -61.2 59 -99 SPO 1997 04 03 01 34 70 6.2 -9 681.40 -61.1 -56.9 -61.2 60 -99 SPO 1997 04 03 01 35 70 6.2 -9 681.50 -61.1 -56.7 -61.2 60 -99 SPO 1997 04 03 01 36 69 6.2 -9 681.40 -61.1 -56.6 -61.1 60 -99 SPO 1997 04 03 01 37 69 6.2 -9 681.50 -61.0 -56.4 -61.1 59 -99 SPO 1997 04 03 01 38 69 6.2 -9 681.50 -61.0 -56.3 -61.1 60 -99 SPO 1997 04 03 01 39 70 6.0 -9 681.50 -61.0 -56.5 -61.1 60 -99 SPO 1997 04 03 01 40 70 5.9 -9 681.50 -61.0 -56.7 -61.1 60 -99 SPO 1997 04 03 01 41 70 5.7 -9 681.50 -61.0 -56.8 -61.1 60 -99 SPO 1997 04 03 01 42 71 5.6 -9 681.50 -61.0 -57.0 -61.1 60 -99 SPO 1997 04 03 01 43 73 5.4 -9 681.50 -61.0 -57.0 -61.1 60 -99 SPO 1997 04 03 01 44 74 5.3 -9 681.50 -61.0 -57.2 -61.1 60 -99 SPO 1997 04 03 01 45 74 5.4 -9 681.50 -61.0 -57.4 -61.1 60 -99 SPO 1997 04 03 01 46 74 5.5 -9 681.50 -61.0 -57.4 -61.1 60 -99 SPO 1997 04 03 01 47 74 5.6 -9 681.50 -61.0 -57.4 -61.1 60 -99 SPO 1997 04 03 01 48 74 5.7 -9 681.50 -61.0 -57.3 -61.1 60 -99 SPO 1997 04 03 01 49 74 5.7 -9 681.50 -61.0 -57.2 -61.1 60 -99 SPO 1997 04 03 01 50 75 5.8 -9 681.50 -61.1 -57.2 -61.2 61 -99 SPO 1997 04 03 01 51 75 5.9 -9 681.50 -61.1 -57.2 -61.2 61 -99 SPO 1997 04 03 01 52 74 5.9 -9 681.50 -61.1 -57.1 -61.2 61 -99 SPO 1997 04 03 01 53 73 6.0 -9 681.50 -61.1 -57.0 -61.2 61 -99 SPO 1997 04 03 01 54 72 6.1 -9 681.50 -61.1 -56.8 -61.2 60 -99 SPO 1997 04 03 01 55 72 6.2 -9 681.50 -61.1 -56.8 -61.1 60 -99 SPO 1997 04 03 01 56 72 6.2 -9 681.50 -61.0 -56.7 -61.1 59 -99 SPO 1997 04 03 01 57 71 6.1 -9 681.50 -61.0 -56.7 -61.1 58 -99 SPO 1997 04 03 01 58 71 6.0 -9 681.50 -61.0 -56.6 -61.1 57 -99 SPO 1997 04 03 01 59 71 6.0 -9 681.50 -61.0 -56.7 -61.1 58 -99 SPO 1997 04 03 02 00 71 5.9 -9 681.50 -61.0 -56.8 -61.1 59 0 SPO 1997 04 03 02 01 70 5.9 -9 681.50 -61.0 -56.6 -61.1 60 -99 SPO 1997 04 03 02 02 70 5.8 -9 681.50 -61.0 -56.6 -61.1 60 -99 SPO 1997 04 03 02 03 70 5.8 -9 681.50 -61.0 -56.4 -61.1 60 -99 SPO 1997 04 03 02 04 70 5.8 -9 681.50 -61.0 -56.3 -61.1 60 -99 SPO 1997 04 03 02 05 70 5.9 -9 681.50 -61.0 -56.4 -61.1 60 -99 SPO 1997 04 03 02 06 69 5.7 -9 681.50 -61.0 -56.3 -61.1 60 -99 SPO 1997 04 03 02 07 70 5.6 -9 681.50 -61.0 -56.3 -61.1 60 -99 SPO 1997 04 03 02 08 71 5.5 -9 681.60 -61.0 -56.4 -61.1 60 -99 SPO 1997 04 03 02 09 72 5.4 -9 681.60 -61.0 -56.5 -61.1 60 -99 SPO 1997 04 03 02 10 72 5.4 -9 681.60 -61.0 -56.6 -61.1 60 -99 SPO 1997 04 03 02 11 72 5.4 -9 681.60 -61.0 -56.6 -61.1 60 -99 SPO 1997 04 03 02 12 72 5.4 -9 681.60 -61.0 -56.6 -61.1 60 -99 SPO 1997 04 03 02 13 71 5.3 -9 681.60 -61.0 -56.6 -61.1 59 -99 SPO 1997 04 03 02 14 71 5.3 -9 681.60 -61.0 -56.7 -61.1 59 -99 SPO 1997 04 03 02 15 70 5.3 -9 681.60 -61.1 -56.7 -61.1 60 -99 SPO 1997 04 03 02 16 71 5.3 -9 681.60 -61.1 -56.7 -61.1 61 -99 SPO 1997 04 03 02 17 73 5.2 -9 681.60 -61.0 -56.7 -61.1 59 -99 SPO 1997 04 03 02 18 73 5.2 -9 681.60 -61.0 -56.8 -61.1 59 -99 SPO 1997 04 03 02 19 73 5.3 -9 681.60 -61.0 -56.8 -61.1 59 -99 SPO 1997 04 03 02 20 73 5.3 -9 681.60 -61.0 -56.8 -61.1 59 -99 SPO 1997 04 03 02 21 74 5.3 -9 681.60 -61.0 -56.7 -61.1 59 -99 SPO 1997 04 03 02 22 74 5.2 -9 681.70 -61.0 -56.7 -61.1 59 -99 SPO 1997 04 03 02 23 74 5.2 -9 681.70 -61.0 -56.7 -61.2 60 -99 SPO 1997 04 03 02 24 75 5.0 -9 681.70 -61.1 -56.8 -61.2 61 -99 SPO 1997 04 03 02 25 76 4.8 -9 681.70 -61.2 -56.8 -61.2 62 -99 SPO 1997 04 03 02 26 78 4.8 -9 681.70 -61.2 -56.9 -61.3 62 -99 SPO 1997 04 03 02 27 78 4.9 -9 681.70 -61.2 -56.9 -61.3 61 -99 SPO 1997 04 03 02 28 78 5.0 -9 681.70 -61.2 -56.9 -61.3 59 -99 SPO 1997 04 03 02 29 79 5.0 -9 681.70 -61.3 -56.8 -61.3 59 -99 SPO 1997 04 03 02 30 80 5.1 -9 681.70 -61.4 -56.8 -61.4 60 -99 SPO 1997 04 03 02 31 80 5.1 -9 681.70 -61.4 -56.8 -61.4 59 -99 SPO 1997 04 03 02 32 83 5.0 -9 681.70 -61.5 -56.7 -61.5 60 -99 SPO 1997 04 03 02 33 88 4.7 -9 681.70 -61.6 -56.8 -61.6 60 -99 SPO 1997 04 03 02 34 89 4.5 -9 681.70 -61.7 -56.9 -61.8 59 -99 SPO 1997 04 03 02 35 89 4.6 -9 681.70 -61.9 -57.0 -61.9 60 -99 SPO 1997 04 03 02 36 89 4.4 -9 681.70 -61.8 -56.9 -61.6 60 -99 SPO 1997 04 03 02 37 89 4.2 -9 681.70 -61.7 -56.8 -61.7 59 -99 SPO 1997 04 03 02 38 91 4.0 -9 681.80 -61.9 -56.9 -61.9 61 -99 SPO 1997 04 03 02 39 92 4.1 -9 681.80 -62.0 -57.0 -62.0 60 -99 SPO 1997 04 03 02 40 93 4.0 -9 681.80 -62.0 -56.9 -61.9 60 -99 SPO 1997 04 03 02 41 92 3.9 -9 681.80 -62.0 -56.9 -61.9 60 -99 SPO 1997 04 03 02 42 93 3.8 -9 681.80 -62.0 -56.9 -62.0 59 -99 SPO 1997 04 03 02 43 92 3.9 -9 681.80 -62.0 -56.8 -61.9 57 -99 SPO 1997 04 03 02 44 90 4.1 -9 681.80 -61.9 -56.9 -61.8 58 -99 SPO 1997 04 03 02 45 90 4.0 -9 681.80 -61.9 -56.8 -61.8 59 -99 SPO 1997 04 03 02 46 93 4.1 -9 681.80 -61.8 -56.8 -61.7 58 -99 SPO 1997 04 03 02 47 94 4.1 -9 681.80 -61.8 -56.7 -61.7 59 -99 SPO 1997 04 03 02 48 91 4.3 -9 681.80 -61.7 -56.7 -61.7 59 -99 SPO 1997 04 03 02 49 92 4.3 -9 681.80 -61.7 -56.7 -61.6 61 -99 SPO 1997 04 03 02 50 93 4.3 -9 681.80 -61.6 -56.7 -61.6 61 -99 SPO 1997 04 03 02 51 93 4.3 -9 681.80 -61.6 -56.7 -61.6 60 -99 SPO 1997 04 03 02 52 92 4.5 -9 681.80 -61.6 -56.6 -61.6 60 -99 SPO 1997 04 03 02 53 94 4.5 -9 681.80 -61.5 -56.7 -61.5 59 -99 SPO 1997 04 03 02 54 96 4.4 -9 681.80 -61.4 -56.7 -61.5 59 -99 SPO 1997 04 03 02 55 96 4.3 -9 681.80 -61.5 -56.8 -61.5 60 -99 SPO 1997 04 03 02 56 93 4.5 -9 681.80 -61.4 -56.6 -61.5 59 -99 SPO 1997 04 03 02 57 90 4.5 -9 681.80 -61.3 -56.4 -61.4 59 -99 SPO 1997 04 03 02 58 90 4.5 -9 681.80 -61.3 -56.4 -61.4 59 -99 SPO 1997 04 03 02 59 92 4.4 -9 681.80 -61.2 -56.4 -61.4 59 -99 SPO 1997 04 03 03 00 94 4.3 -9 681.80 -61.3 -56.6 -61.4 60 0 SPO 1997 04 03 03 01 92 4.4 -9 681.80 -61.3 -56.6 -61.4 62 -99 SPO 1997 04 03 03 02 89 4.6 -9 681.80 -61.3 -56.6 -61.4 60 -99 SPO 1997 04 03 03 03 88 4.7 -9 681.80 -61.3 -56.5 -61.4 59 -99 SPO 1997 04 03 03 04 87 4.8 -9 681.80 -61.3 -56.4 -61.4 59 -99 SPO 1997 04 03 03 05 86 4.7 -9 681.80 -61.2 -56.5 -61.4 59 -99 SPO 1997 04 03 03 06 86 4.6 -9 681.80 -61.3 -56.4 -61.4 59 -99 SPO 1997 04 03 03 07 87 4.4 -9 681.80 -61.3 -56.3 -61.4 59 -99 SPO 1997 04 03 03 08 87 4.3 -9 681.80 -61.3 -56.2 -61.4 59 -99 SPO 1997 04 03 03 09 87 4.5 -9 681.80 -61.3 -56.0 -61.4 59 -99 SPO 1997 04 03 03 10 87 4.5 -9 681.80 -61.4 -56.0 -61.4 60 -99 SPO 1997 04 03 03 11 88 4.5 -9 681.80 -61.3 -56.0 -61.4 60 -99 SPO 1997 04 03 03 12 88 4.5 -9 681.80 -61.3 -55.9 -61.4 60 -99 SPO 1997 04 03 03 13 89 4.3 -9 681.80 -61.4 -55.9 -61.5 60 -99 SPO 1997 04 03 03 14 89 4.3 -9 681.80 -61.4 -55.8 -61.5 60 -99 SPO 1997 04 03 03 15 89 4.3 -9 681.80 -61.5 -55.8 -61.5 60 -99 SPO 1997 04 03 03 16 88 4.4 -9 681.80 -61.5 -55.8 -61.5 60 -99 SPO 1997 04 03 03 17 87 4.5 -9 681.80 -61.5 -55.7 -61.5 60 -99 SPO 1997 04 03 03 18 87 4.5 -9 681.80 -61.4 -55.6 -61.4 59 -99 SPO 1997 04 03 03 19 87 4.6 -9 681.80 -61.4 -55.6 -61.4 59 -99 SPO 1997 04 03 03 20 87 4.5 -9 681.80 -61.4 -55.6 -61.5 59 -99 SPO 1997 04 03 03 21 88 4.3 -9 681.80 -61.4 -55.6 -61.5 59 -99 SPO 1997 04 03 03 22 89 4.0 -9 681.80 -61.5 -55.6 -61.6 60 -99 SPO 1997 04 03 03 23 91 4.0 -9 681.80 -61.6 -55.6 -61.7 61 -99 SPO 1997 04 03 03 24 91 4.1 -9 681.80 -61.7 -55.6 -61.8 62 -99 SPO 1997 04 03 03 25 91 4.1 -9 681.90 -61.7 -55.6 -61.8 61 -99 SPO 1997 04 03 03 26 91 4.0 -9 681.90 -61.8 -55.6 -61.8 60 -99 SPO 1997 04 03 03 27 92 3.9 -9 681.90 -61.8 -55.7 -61.8 59 -99 SPO 1997 04 03 03 28 91 3.8 -9 681.90 -61.8 -55.8 -61.8 58 -99 SPO 1997 04 03 03 29 91 3.8 -9 681.90 -61.9 -55.9 -61.9 59 -99 SPO 1997 04 03 03 30 90 3.8 -9 681.90 -61.9 -55.9 -61.9 59 -99 SPO 1997 04 03 03 31 90 3.8 -9 681.90 -62.0 -55.8 -61.9 60 -99 SPO 1997 04 03 03 32 91 3.7 -9 681.90 -62.0 -55.7 -62.0 60 -99 SPO 1997 04 03 03 33 91 3.7 -9 681.90 -62.1 -55.7 -62.0 61 -99 SPO 1997 04 03 03 34 92 3.7 -9 681.90 -62.2 -55.7 -62.1 61 -99 SPO 1997 04 03 03 35 92 3.7 -9 681.90 -62.2 -55.7 -62.2 61 -99 SPO 1997 04 03 03 36 91 3.8 -9 681.90 -62.3 -55.7 -62.2 59 -99 SPO 1997 04 03 03 37 88 3.8 -9 681.90 -62.4 -55.6 -62.2 59 -99 SPO 1997 04 03 03 38 88 3.6 -9 681.90 -62.2 -55.4 -62.2 58 -99 SPO 1997 04 03 03 39 91 3.5 -9 682.00 -62.2 -55.6 -62.1 58 -99 SPO 1997 04 03 03 40 93 3.5 -9 682.00 -62.2 -55.9 -62.2 58 -99 SPO 1997 04 03 03 41 94 3.4 -9 682.00 -62.3 -56.0 -62.2 58 -99 SPO 1997 04 03 03 42 94 3.4 -9 682.00 -62.3 -55.8 -62.2 58 -99 SPO 1997 04 03 03 43 94 3.3 -9 682.00 -62.3 -55.6 -62.3 58 -99 SPO 1997 04 03 03 44 94 3.2 -9 682.00 -62.4 -55.5 -62.4 58 -99 SPO 1997 04 03 03 45 94 3.2 -9 682.00 -62.5 -55.4 -62.4 57 -99 SPO 1997 04 03 03 46 93 3.3 -9 682.00 -62.6 -55.4 -62.5 58 -99 SPO 1997 04 03 03 47 95 3.3 -9 682.00 -62.6 -55.4 -62.5 58 -99 SPO 1997 04 03 03 48 97 3.2 -9 682.00 -62.8 -55.4 -62.6 59 -99 SPO 1997 04 03 03 49 97 3.3 -9 682.00 -62.8 -55.5 -62.7 59 -99 SPO 1997 04 03 03 50 96 3.3 -9 682.00 -62.8 -55.3 -62.6 59 -99 SPO 1997 04 03 03 51 99 3.1 -9 682.00 -62.8 -55.2 -62.7 58 -99 SPO 1997 04 03 03 52 98 3.2 -9 682.00 -62.8 -55.1 -62.7 58 -99 SPO 1997 04 03 03 53 96 3.2 -9 682.00 -62.8 -54.8 -62.8 57 -99 SPO 1997 04 03 03 54 95 3.2 -9 681.90 -62.8 -54.5 -62.7 56 -99 SPO 1997 04 03 03 55 96 3.2 -9 681.90 -62.8 -54.3 -62.8 56 -99 SPO 1997 04 03 03 56 97 3.0 -9 681.90 -62.9 -54.2 -62.9 57 -99 SPO 1997 04 03 03 57 95 3.1 -9 681.90 -63.0 -54.0 -62.9 57 -99 SPO 1997 04 03 03 58 96 3.1 -9 682.00 -63.0 -54.0 -62.9 57 -99 SPO 1997 04 03 03 59 94 3.2 -9 682.00 -63.0 -54.0 -62.9 57 -99 SPO 1997 04 03 04 00 93 3.3 -9 682.00 -63.0 -54.0 -62.9 57 0 SPO 1997 04 03 04 01 92 3.4 -9 681.90 -63.0 -54.0 -62.9 57 -99 SPO 1997 04 03 04 02 91 3.4 -9 682.00 -63.0 -54.0 -62.9 57 -99 SPO 1997 04 03 04 03 92 3.4 -9 682.00 -63.0 -54.2 -62.9 57 -99 SPO 1997 04 03 04 04 93 3.3 -9 682.00 -63.1 -54.4 -63.0 57 -99 SPO 1997 04 03 04 05 96 3.3 -9 682.00 -63.1 -54.2 -63.0 57 -99 SPO 1997 04 03 04 06 98 3.3 -9 682.00 -63.1 -53.9 -63.0 58 -99 SPO 1997 04 03 04 07 95 3.3 -9 682.00 -62.9 -54.0 -62.9 57 -99 SPO 1997 04 03 04 08 95 3.3 -9 682.00 -62.9 -54.1 -62.9 57 -99 SPO 1997 04 03 04 09 94 3.4 -9 682.00 -63.0 -54.0 -62.9 59 -99 SPO 1997 04 03 04 10 93 3.6 -9 682.00 -62.9 -53.9 -62.8 58 -99 SPO 1997 04 03 04 11 93 3.5 -9 682.00 -62.8 -53.9 -62.8 58 -99 SPO 1997 04 03 04 12 97 3.5 -9 682.00 -62.8 -54.0 -62.8 58 -99 SPO 1997 04 03 04 13 98 3.5 -9 682.00 -62.9 -54.0 -62.9 59 -99 SPO 1997 04 03 04 14 98 3.5 -9 682.00 -62.9 -54.0 -62.9 59 -99 SPO 1997 04 03 04 15 101 3.3 -9 682.00 -62.8 -54.1 -62.8 57 -99 SPO 1997 04 03 04 16 102 3.2 -9 682.00 -62.8 -54.3 -62.9 57 -99 SPO 1997 04 03 04 17 102 3.3 -9 682.00 -62.9 -54.5 -62.9 57 -99 SPO 1997 04 03 04 18 101 3.5 -9 682.00 -62.8 -54.5 -62.9 57 -99 SPO 1997 04 03 04 19 102 3.5 -9 682.00 -62.9 -54.6 -62.9 59 -99 SPO 1997 04 03 04 20 101 3.6 -9 682.00 -62.9 -54.7 -62.9 59 -99 SPO 1997 04 03 04 21 99 3.6 -9 682.00 -62.9 -54.6 -62.9 59 -99 SPO 1997 04 03 04 22 97 3.8 -9 682.00 -62.9 -54.4 -62.9 59 -99 SPO 1997 04 03 04 23 98 3.9 -9 682.00 -62.8 -54.4 -62.8 59 -99 SPO 1997 04 03 04 24 98 3.9 -9 682.10 -62.6 -54.4 -62.7 57 -99 SPO 1997 04 03 04 25 96 3.9 -9 682.10 -62.6 -54.4 -62.7 57 -99 SPO 1997 04 03 04 26 97 4.0 -9 682.10 -62.6 -54.4 -62.7 58 -99 SPO 1997 04 03 04 27 95 4.1 -9 682.00 -62.6 -54.4 -62.7 57 -99 SPO 1997 04 03 04 28 93 4.2 -9 682.10 -62.6 -54.2 -62.6 58 -99 SPO 1997 04 03 04 29 92 4.4 -9 682.00 -62.5 -54.0 -62.5 59 -99 SPO 1997 04 03 04 30 93 4.5 -9 682.00 -62.4 -53.9 -62.4 59 -99 SPO 1997 04 03 04 31 93 4.5 -9 682.00 -62.3 -53.9 -62.3 58 -99 SPO 1997 04 03 04 32 93 4.5 -9 682.00 -62.3 -53.9 -62.4 58 -99 SPO 1997 04 03 04 33 92 4.7 -9 682.00 -62.3 -53.9 -62.4 59 -99 SPO 1997 04 03 04 34 90 4.8 -9 682.00 -62.4 -54.0 -62.5 60 -99 SPO 1997 04 03 04 35 90 4.8 -9 682.00 -62.4 -53.9 -62.4 60 -99 SPO 1997 04 03 04 36 91 4.8 -9 682.00 -62.4 -53.9 -62.4 59 -99 SPO 1997 04 03 04 37 92 4.8 -9 682.00 -62.4 -53.8 -62.4 59 -99 SPO 1997 04 03 04 38 92 4.8 -9 682.00 -62.4 -53.9 -62.3 59 -99 SPO 1997 04 03 04 39 91 4.8 -9 682.00 -62.3 -53.9 -62.2 58 -99 SPO 1997 04 03 04 40 91 4.7 -9 682.00 -62.2 -53.9 -62.2 58 -99 SPO 1997 04 03 04 41 91 4.6 -9 682.00 -62.0 -53.9 -62.1 59 -99 SPO 1997 04 03 04 42 91 4.5 -9 682.00 -62.0 -53.9 -62.1 60 -99 SPO 1997 04 03 04 43 90 4.6 -9 682.00 -62.0 -53.8 -62.0 60 -99 SPO 1997 04 03 04 44 90 4.6 -9 682.00 -61.9 -53.8 -62.0 60 -99 SPO 1997 04 03 04 45 89 4.6 -9 682.00 -61.8 -53.8 -61.9 60 -99 SPO 1997 04 03 04 46 90 4.5 -9 682.00 -61.8 -53.8 -61.8 60 -99 SPO 1997 04 03 04 47 90 4.6 -9 682.00 -61.8 -53.9 -61.9 60 -99 SPO 1997 04 03 04 48 91 4.5 -9 682.00 -61.8 -53.9 -61.9 60 -99 SPO 1997 04 03 04 49 92 4.4 -9 682.00 -61.8 -54.0 -61.9 60 -99 SPO 1997 04 03 04 50 93 4.3 -9 682.00 -61.8 -54.2 -61.9 60 -99 SPO 1997 04 03 04 51 93 4.4 -9 682.00 -61.8 -54.2 -61.9 60 -99 SPO 1997 04 03 04 52 93 4.5 -9 682.00 -61.8 -54.3 -61.9 60 -99 SPO 1997 04 03 04 53 92 4.5 -9 682.00 -61.8 -54.2 -61.9 62 -99 SPO 1997 04 03 04 54 92 4.7 -9 682.00 -61.8 -54.1 -61.9 62 -99 SPO 1997 04 03 04 55 92 4.8 -9 682.00 -61.9 -54.0 -61.9 62 -99 SPO 1997 04 03 04 56 91 4.8 -9 682.00 -61.9 -53.9 -62.0 61 -99 SPO 1997 04 03 04 57 92 4.9 -9 682.00 -61.8 -53.8 -61.9 60 -99 SPO 1997 04 03 04 58 92 5.0 -9 682.00 -61.8 -53.7 -61.9 60 -99 SPO 1997 04 03 04 59 91 5.2 -9 682.00 -61.8 -53.7 -61.9 60 -99 SPO 1997 04 03 05 00 91 5.2 -9 681.90 -61.8 -53.6 -61.8 59 0 SPO 1997 04 03 05 01 90 5.3 -9 681.90 -61.8 -53.5 -61.9 59 -99 SPO 1997 04 03 05 02 89 5.4 -9 682.00 -61.8 -53.6 -61.8 59 -99 SPO 1997 04 03 05 03 89 5.5 -9 681.90 -61.8 -53.6 -61.8 59 -99 SPO 1997 04 03 05 04 89 5.4 -9 681.90 -61.8 -53.6 -61.8 60 -99 SPO 1997 04 03 05 05 89 5.2 -9 681.90 -61.8 -53.6 -61.8 60 -99 SPO 1997 04 03 05 06 89 5.1 -9 681.90 -61.7 -53.5 -61.8 61 -99 SPO 1997 04 03 05 07 89 5.0 -9 682.00 -61.7 -53.4 -61.7 62 -99 SPO 1997 04 03 05 08 89 4.9 -9 682.00 -61.6 -53.3 -61.7 61 -99 SPO 1997 04 03 05 09 89 4.9 -9 682.00 -61.6 -53.4 -61.7 62 -99 SPO 1997 04 03 05 10 89 4.9 -9 682.00 -61.6 -53.4 -61.7 62 -99 SPO 1997 04 03 05 11 89 5.0 -9 682.00 -61.6 -53.4 -61.6 62 -99 SPO 1997 04 03 05 12 88 5.0 -9 681.90 -61.5 -53.4 -61.6 61 -99 SPO 1997 04 03 05 13 89 4.8 -9 682.00 -61.5 -53.4 -61.5 61 -99 SPO 1997 04 03 05 14 88 4.8 -9 682.00 -61.4 -53.4 -61.5 60 -99 SPO 1997 04 03 05 15 88 4.8 -9 682.00 -61.4 -53.2 -61.5 61 -99 SPO 1997 04 03 05 16 88 4.8 -9 682.00 -61.4 -53.1 -61.5 61 -99 SPO 1997 04 03 05 17 88 4.7 -9 682.00 -61.4 -53.1 -61.5 61 -99 SPO 1997 04 03 05 18 89 4.6 -9 682.00 -61.4 -53.3 -61.5 61 -99 SPO 1997 04 03 05 19 90 4.6 -9 682.10 -61.4 -53.6 -61.5 61 -99 SPO 1997 04 03 05 20 90 4.6 -9 682.10 -61.4 -53.7 -61.5 61 -99 SPO 1997 04 03 05 21 90 4.7 -9 682.00 -61.4 -53.8 -61.5 61 -99 SPO 1997 04 03 05 22 89 4.8 -9 682.00 -61.4 -53.8 -61.5 60 -99 SPO 1997 04 03 05 23 89 4.9 -9 682.00 -61.5 -53.9 -61.6 61 -99 SPO 1997 04 03 05 24 89 4.9 -9 682.00 -61.5 -54.0 -61.6 60 -99 SPO 1997 04 03 05 25 88 4.9 -9 682.00 -61.5 -54.1 -61.6 60 -99 SPO 1997 04 03 05 26 88 4.8 -9 682.00 -61.5 -54.2 -61.6 60 -99 SPO 1997 04 03 05 27 89 4.7 -9 682.00 -61.6 -54.3 -61.6 62 -99 SPO 1997 04 03 05 28 89 4.6 -9 682.00 -61.6 -54.3 -61.7 62 -99 SPO 1997 04 03 05 29 89 4.5 -9 682.00 -61.6 -54.4 -61.7 62 -99 SPO 1997 04 03 05 30 90 4.5 -9 682.00 -61.6 -54.4 -61.6 62 -99 SPO 1997 04 03 05 31 90 4.4 -9 682.00 -61.6 -54.5 -61.6 62 -99 SPO 1997 04 03 05 32 91 4.5 -9 682.10 -61.5 -54.5 -61.6 61 -99 SPO 1997 04 03 05 33 91 4.5 -9 682.10 -61.6 -54.7 -61.6 61 -99 SPO 1997 04 03 05 34 90 4.6 -9 682.00 -61.6 -54.8 -61.7 61 -99 SPO 1997 04 03 05 35 90 4.6 -9 682.10 -61.6 -54.7 -61.7 61 -99 SPO 1997 04 03 05 36 91 4.6 -9 682.10 -61.6 -54.7 -61.7 61 -99 SPO 1997 04 03 05 37 92 4.6 -9 682.10 -61.7 -54.7 -61.7 62 -99 SPO 1997 04 03 05 38 93 4.5 -9 682.10 -61.7 -54.7 -61.7 62 -99 SPO 1997 04 03 05 39 93 4.6 -9 682.10 -61.7 -54.6 -61.7 62 -99 SPO 1997 04 03 05 40 94 4.6 -9 682.00 -61.7 -54.5 -61.8 62 -99 SPO 1997 04 03 05 41 94 4.6 -9 682.10 -61.7 -54.5 -61.8 62 -99 SPO 1997 04 03 05 42 95 4.5 -9 682.10 -61.8 -54.4 -61.8 62 -99 SPO 1997 04 03 05 43 95 4.4 -9 682.10 -61.8 -54.2 -61.7 62 -99 SPO 1997 04 03 05 44 96 4.3 -9 682.10 -61.7 -54.1 -61.7 62 -99 SPO 1997 04 03 05 45 98 4.2 -9 682.10 -61.7 -54.2 -61.8 61 -99 SPO 1997 04 03 05 46 99 4.1 -9 682.10 -61.7 -54.2 -61.8 59 -99 SPO 1997 04 03 05 47 99 4.0 -9 682.10 -61.8 -54.0 -61.8 60 -99 SPO 1997 04 03 05 48 99 4.2 -9 682.10 -61.8 -53.8 -61.8 59 -99 SPO 1997 04 03 05 49 99 4.2 -9 682.10 -61.8 -53.8 -61.8 59 -99 SPO 1997 04 03 05 50 98 4.3 -9 682.10 -61.9 -53.9 -61.9 60 -99 SPO 1997 04 03 05 51 96 4.5 -9 682.10 -62.0 -53.9 -62.0 61 -99 SPO 1997 04 03 05 52 96 4.5 -9 682.10 -62.0 -54.0 -62.1 61 -99 SPO 1997 04 03 05 53 95 4.6 -9 682.10 -62.2 -53.9 -62.2 61 -99 SPO 1997 04 03 05 54 95 4.6 -9 682.10 -62.2 -53.8 -62.3 61 -99 SPO 1997 04 03 05 55 96 4.6 -9 682.10 -62.4 -53.9 -62.4 62 -99 SPO 1997 04 03 05 56 97 4.6 -9 682.10 -62.4 -54.0 -62.4 60 -99 SPO 1997 04 03 05 57 98 4.6 -9 682.10 -62.4 -53.9 -62.4 59 -99 SPO 1997 04 03 05 58 98 4.6 -9 682.10 -62.5 -54.0 -62.4 60 -99 SPO 1997 04 03 05 59 98 4.6 -9 682.10 -62.5 -54.0 -62.4 60 -99 SPO 1997 04 03 06 00 96 4.7 -9 682.10 -62.5 -53.9 -62.4 60 0 SPO 1997 04 03 06 01 96 4.6 -9 682.10 -62.5 -53.8 -62.4 60 -99 SPO 1997 04 03 06 02 96 4.5 -9 682.10 -62.4 -53.6 -62.4 59 -99 SPO 1997 04 03 06 03 97 4.5 -9 682.10 -62.4 -53.6 -62.3 60 -99 SPO 1997 04 03 06 04 98 4.5 -9 682.10 -62.3 -53.6 -62.3 59 -99 SPO 1997 04 03 06 05 98 4.4 -9 682.10 -62.4 -53.7 -62.3 60 -99 SPO 1997 04 03 06 06 99 4.3 -9 682.10 -62.3 -53.8 -62.3 59 -99 SPO 1997 04 03 06 07 99 4.3 -9 682.10 -62.3 -53.9 -62.3 59 -99 SPO 1997 04 03 06 08 98 4.3 -9 682.10 -62.3 -54.0 -62.3 58 -99 SPO 1997 04 03 06 09 98 4.4 -9 682.10 -62.3 -54.1 -62.3 58 -99 SPO 1997 04 03 06 10 97 4.5 -9 682.20 -62.3 -54.1 -62.3 58 -99 SPO 1997 04 03 06 11 96 4.6 -9 682.10 -62.3 -54.1 -62.3 58 -99 SPO 1997 04 03 06 12 94 4.6 -9 682.10 -62.2 -54.0 -62.3 58 -99 SPO 1997 04 03 06 13 94 4.6 -9 682.10 -62.3 -53.9 -62.4 58 -99 SPO 1997 04 03 06 14 95 4.6 -9 682.10 -62.3 -54.0 -62.4 59 -99 SPO 1997 04 03 06 15 97 4.5 -9 682.10 -62.4 -54.3 -62.4 60 -99 SPO 1997 04 03 06 16 99 4.4 -9 682.10 -62.4 -55.0 -62.4 59 -99 SPO 1997 04 03 06 17 99 4.4 -9 682.10 -62.5 -55.8 -62.5 60 -99 SPO 1997 04 03 06 18 99 4.5 -9 682.20 -62.5 -56.2 -62.5 59 -99 SPO 1997 04 03 06 19 100 4.5 -9 682.10 -62.5 -56.6 -62.6 59 -99 SPO 1997 04 03 06 20 100 4.6 -9 682.10 -62.5 -56.6 -62.6 59 -99 SPO 1997 04 03 06 21 100 4.6 -9 682.10 -62.6 -56.5 -62.6 58 -99 SPO 1997 04 03 06 22 98 4.7 -9 682.10 -62.7 -56.4 -62.6 58 -99 SPO 1997 04 03 06 23 97 4.8 -9 682.10 -62.8 -56.3 -62.6 58 -99 SPO 1997 04 03 06 24 97 4.9 -9 682.10 -62.7 -56.3 -62.6 58 -99 SPO 1997 04 03 06 25 96 5.0 -9 682.10 -62.6 -56.4 -62.7 58 -99 SPO 1997 04 03 06 26 93 5.1 -9 682.10 -62.7 -56.4 -62.7 59 -99 SPO 1997 04 03 06 27 93 5.2 -9 682.10 -62.7 -56.4 -62.8 58 -99 SPO 1997 04 03 06 28 94 5.3 -9 682.20 -62.7 -56.4 -62.7 59 -99 SPO 1997 04 03 06 29 94 5.4 -9 682.20 -62.7 -56.5 -62.6 59 -99 SPO 1997 04 03 06 30 93 5.4 -9 682.20 -62.6 -56.5 -62.6 58 -99 SPO 1997 04 03 06 31 93 5.5 -9 682.20 -62.5 -56.4 -62.5 57 -99 SPO 1997 04 03 06 32 94 5.5 -9 682.20 -62.4 -56.4 -62.4 58 -99 SPO 1997 04 03 06 33 95 5.4 -9 682.20 -62.3 -56.5 -62.3 58 -99 SPO 1997 04 03 06 34 94 5.4 -9 682.10 -62.3 -56.7 -62.3 58 -99 SPO 1997 04 03 06 35 93 5.4 -9 682.10 -62.3 -56.8 -62.3 58 -99 SPO 1997 04 03 06 36 91 5.4 -9 682.10 -62.3 -56.7 -62.3 61 -99 SPO 1997 04 03 06 37 90 5.5 -9 682.10 -62.2 -56.4 -62.2 61 -99 SPO 1997 04 03 06 38 91 5.5 -9 682.10 -62.1 -56.1 -62.2 61 -99 SPO 1997 04 03 06 39 92 5.5 -9 682.10 -62.1 -56.2 -62.2 61 -99 SPO 1997 04 03 06 40 92 5.5 -9 682.10 -62.0 -56.4 -62.1 61 -99 SPO 1997 04 03 06 41 92 5.4 -9 682.10 -62.0 -56.5 -62.1 61 -99 SPO 1997 04 03 06 42 93 5.4 -9 682.10 -62.0 -56.6 -62.1 61 -99 SPO 1997 04 03 06 43 93 5.4 -9 682.20 -61.9 -56.8 -62.1 60 -99 SPO 1997 04 03 06 44 91 5.4 -9 682.10 -62.0 -56.9 -62.1 60 -99 SPO 1997 04 03 06 45 91 5.5 -9 682.10 -62.0 -56.8 -62.2 60 -99 SPO 1997 04 03 06 46 92 5.6 -9 682.10 -62.0 -56.6 -62.2 60 -99 SPO 1997 04 03 06 47 93 5.6 -9 682.20 -62.1 -56.1 -62.2 61 -99 SPO 1997 04 03 06 48 95 5.4 -9 682.20 -62.1 -56.1 -62.2 61 -99 SPO 1997 04 03 06 49 96 5.3 -9 682.20 -62.0 -56.4 -62.2 60 -99 SPO 1997 04 03 06 50 97 5.2 -9 682.20 -62.1 -56.6 -62.2 61 -99 SPO 1997 04 03 06 51 97 5.2 -9 682.20 -62.2 -56.5 -62.2 61 -99 SPO 1997 04 03 06 52 97 5.1 -9 682.20 -62.2 -56.1 -62.2 61 -99 SPO 1997 04 03 06 53 97 5.1 -9 682.20 -62.2 -55.7 -62.2 61 -99 SPO 1997 04 03 06 54 97 4.9 -9 682.20 -62.2 -55.6 -62.2 61 -99 SPO 1997 04 03 06 55 98 5.0 -9 682.20 -62.2 -55.5 -62.2 61 -99 SPO 1997 04 03 06 56 100 4.9 -9 682.20 -62.2 -55.6 -62.2 61 -99 SPO 1997 04 03 06 57 101 4.9 -9 682.30 -62.1 -55.7 -62.2 60 -99 SPO 1997 04 03 06 58 101 4.9 -9 682.30 -62.2 -55.7 -62.3 61 -99 SPO 1997 04 03 06 59 100 4.9 -9 682.30 -62.2 -55.7 -62.2 61 -99 SPO 1997 04 03 07 00 101 4.9 -9 682.30 -62.2 -55.7 -62.2 61 0 SPO 1997 04 03 07 01 101 4.9 -9 682.30 -62.2 -55.7 -62.3 61 -99 SPO 1997 04 03 07 02 102 4.8 -9 682.30 -62.3 -55.8 -62.4 59 -99 SPO 1997 04 03 07 03 103 4.9 -9 682.30 -62.4 -55.8 -62.4 59 -99 SPO 1997 04 03 07 04 103 4.8 -9 682.30 -62.4 -56.0 -62.5 59 -99 SPO 1997 04 03 07 05 105 4.7 -9 682.30 -62.5 -56.0 -62.6 59 -99 SPO 1997 04 03 07 06 106 4.6 -9 682.40 -62.6 -56.2 -62.6 58 -99 SPO 1997 04 03 07 07 108 4.4 -9 682.40 -62.8 -56.4 -62.7 59 -99 SPO 1997 04 03 07 08 108 4.3 -9 682.40 -62.8 -56.6 -62.8 58 -99 SPO 1997 04 03 07 09 108 4.4 -9 682.40 -62.9 -56.7 -63.0 59 -99 SPO 1997 04 03 07 10 109 4.4 -9 682.40 -63.0 -56.7 -63.0 59 -99 SPO 1997 04 03 07 11 109 4.5 -9 682.40 -63.0 -56.9 -63.0 59 -99 SPO 1997 04 03 07 12 107 4.7 -9 682.40 -63.0 -57.0 -63.0 59 -99 SPO 1997 04 03 07 13 105 4.8 -9 682.40 -63.0 -56.7 -62.9 59 -99 SPO 1997 04 03 07 14 104 4.9 -9 682.40 -63.0 -56.5 -62.9 60 -99 SPO 1997 04 03 07 15 104 5.0 -9 682.40 -63.0 -56.3 -62.9 60 -99 SPO 1997 04 03 07 16 103 4.9 -9 682.40 -63.0 -56.1 -63.0 60 -99 SPO 1997 04 03 07 17 104 4.8 -9 682.40 -63.0 -55.9 -63.0 59 -99 SPO 1997 04 03 07 18 105 4.7 -9 682.40 -63.0 -55.9 -62.9 57 -99 SPO 1997 04 03 07 19 106 4.6 -9 682.40 -62.9 -56.1 -62.9 57 -99 SPO 1997 04 03 07 20 107 4.5 -9 682.40 -62.9 -56.3 -62.9 57 -99 SPO 1997 04 03 07 21 107 4.5 -9 682.40 -62.8 -56.6 -62.8 57 -99 SPO 1997 04 03 07 22 107 4.4 -9 682.40 -62.8 -56.6 -62.7 58 -99 SPO 1997 04 03 07 23 107 4.3 -9 682.40 -62.8 -56.8 -62.6 59 -99 SPO 1997 04 03 07 24 107 4.2 -9 682.40 -62.7 -56.8 -62.6 58 -99 SPO 1997 04 03 07 25 107 4.2 -9 682.40 -62.6 -56.7 -62.6 58 -99 SPO 1997 04 03 07 26 107 4.2 -9 682.40 -62.5 -56.6 -62.6 59 -99 SPO 1997 04 03 07 27 106 4.2 -9 682.40 -62.5 -56.7 -62.6 59 -99 SPO 1997 04 03 07 28 104 4.2 -9 682.40 -62.6 -56.5 -62.7 60 -99 SPO 1997 04 03 07 29 103 4.2 -9 682.40 -62.7 -56.3 -62.8 58 -99 SPO 1997 04 03 07 30 103 4.2 -9 682.40 -62.7 -56.3 -62.8 58 -99 SPO 1997 04 03 07 31 103 4.3 -9 682.40 -62.7 -56.2 -62.8 58 -99 SPO 1997 04 03 07 32 102 4.4 -9 682.40 -62.7 -56.0 -62.8 57 -99 SPO 1997 04 03 07 33 102 4.4 -9 682.40 -62.7 -56.0 -62.8 57 -99 SPO 1997 04 03 07 34 100 4.4 -9 682.40 -62.7 -55.9 -62.7 59 -99 SPO 1997 04 03 07 35 98 4.5 -9 682.40 -62.6 -56.0 -62.7 60 -99 SPO 1997 04 03 07 36 98 4.6 -9 682.40 -62.7 -56.0 -62.6 61 -99 SPO 1997 04 03 07 37 97 4.6 -9 682.40 -62.6 -55.9 -62.6 61 -99 SPO 1997 04 03 07 38 97 4.6 -9 682.40 -62.6 -56.0 -62.6 61 -99 SPO 1997 04 03 07 39 98 4.5 -9 682.40 -62.6 -56.0 -62.6 61 -99 SPO 1997 04 03 07 40 99 4.4 -9 682.40 -62.5 -56.2 -62.6 61 -99 SPO 1997 04 03 07 41 102 4.4 -9 682.40 -62.4 -56.4 -62.6 59 -99 SPO 1997 04 03 07 42 103 4.5 -9 682.50 -62.5 -56.8 -62.6 60 -99 SPO 1997 04 03 07 43 104 4.5 -9 682.50 -62.5 -57.2 -62.6 60 -99 SPO 1997 04 03 07 44 104 4.6 -9 682.50 -62.6 -57.5 -62.7 60 -99 SPO 1997 04 03 07 45 104 4.6 -9 682.50 -62.6 -57.6 -62.7 60 -99 SPO 1997 04 03 07 46 107 4.6 -9 682.50 -62.6 -57.8 -62.7 60 -99 SPO 1997 04 03 07 47 107 4.5 -9 682.50 -62.6 -58.0 -62.7 60 -99 SPO 1997 04 03 07 48 107 4.7 -9 682.50 -62.6 -58.2 -62.7 58 -99 SPO 1997 04 03 07 49 108 4.7 -9 682.50 -62.6 -58.4 -62.7 60 -99 SPO 1997 04 03 07 50 107 4.7 -9 682.50 -62.6 -58.6 -62.7 60 -99 SPO 1997 04 03 07 51 106 4.8 -9 682.50 -62.7 -58.6 -62.7 59 -99 SPO 1997 04 03 07 52 103 4.9 -9 682.50 -62.7 -58.3 -62.6 58 -99 SPO 1997 04 03 07 53 103 5.0 -9 682.50 -62.7 -58.2 -62.6 59 -99 SPO 1997 04 03 07 54 104 5.0 -9 682.50 -62.6 -58.3 -62.7 57 -99 SPO 1997 04 03 07 55 105 4.9 -9 682.50 -62.6 -58.4 -62.7 57 -99 SPO 1997 04 03 07 56 103 4.9 -9 682.40 -62.6 -58.5 -62.7 57 -99 SPO 1997 04 03 07 57 101 4.9 -9 682.50 -62.7 -58.4 -62.8 61 -99 SPO 1997 04 03 07 58 100 4.8 -9 682.50 -62.7 -58.4 -62.8 61 -99 SPO 1997 04 03 07 59 99 4.9 -9 682.50 -62.7 -58.2 -62.8 59 -99 SPO 1997 04 03 08 00 99 4.9 -9 682.50 -62.7 -58.2 -62.8 58 0 SPO 1997 04 03 08 01 99 4.9 -9 682.50 -62.8 -58.1 -62.8 59 -99 SPO 1997 04 03 08 02 99 5.0 -9 682.50 -62.8 -57.9 -62.8 58 -99 SPO 1997 04 03 08 03 99 5.0 -9 682.50 -62.8 -57.6 -62.8 58 -99 SPO 1997 04 03 08 04 98 5.0 -9 682.40 -62.7 -57.3 -62.8 57 -99 SPO 1997 04 03 08 05 97 5.0 -9 682.40 -62.7 -57.2 -62.7 58 -99 SPO 1997 04 03 08 06 98 5.2 -9 682.40 -62.7 -57.2 -62.6 59 -99 SPO 1997 04 03 08 07 97 5.1 -9 682.40 -62.7 -56.8 -62.6 61 -99 SPO 1997 04 03 08 08 96 5.0 -9 682.40 -62.6 -56.5 -62.6 61 -99 SPO 1997 04 03 08 09 96 5.0 -9 682.40 -62.6 -56.4 -62.5 61 -99 SPO 1997 04 03 08 10 95 5.1 -9 682.40 -62.4 -56.3 -62.5 62 -99 SPO 1997 04 03 08 11 94 5.0 -9 682.40 -62.4 -56.0 -62.5 62 -99 SPO 1997 04 03 08 12 94 5.0 -9 682.40 -62.4 -55.6 -62.5 62 -99 SPO 1997 04 03 08 13 93 5.1 -9 682.40 -62.4 -55.4 -62.5 63 -99 SPO 1997 04 03 08 14 92 5.2 -9 682.40 -62.4 -55.2 -62.5 62 -99 SPO 1997 04 03 08 15 91 5.3 -9 682.40 -62.4 -55.0 -62.4 62 -99 SPO 1997 04 03 08 16 91 5.4 -9 682.40 -62.3 -54.8 -62.4 61 -99 SPO 1997 04 03 08 17 91 5.5 -9 682.40 -62.3 -54.5 -62.4 59 -99 SPO 1997 04 03 08 18 91 5.5 -9 682.40 -62.2 -54.2 -62.3 58 -99 SPO 1997 04 03 08 19 91 5.5 -9 682.40 -62.2 -54.1 -62.3 58 -99 SPO 1997 04 03 08 20 92 5.4 -9 682.40 -62.2 -54.0 -62.3 58 -99 SPO 1997 04 03 08 21 93 5.3 -9 682.40 -62.2 -54.1 -62.2 61 -99 SPO 1997 04 03 08 22 93 5.3 -9 682.40 -62.2 -54.2 -62.2 61 -99 SPO 1997 04 03 08 23 92 5.3 -9 682.40 -62.1 -54.3 -62.2 61 -99 SPO 1997 04 03 08 24 92 5.3 -9 682.40 -62.2 -54.4 -62.2 61 -99 SPO 1997 04 03 08 25 90 5.4 -9 682.40 -62.2 -54.5 -62.2 61 -99 SPO 1997 04 03 08 26 92 5.4 -9 682.40 -62.2 -54.3 -62.2 61 -99 SPO 1997 04 03 08 27 92 5.3 -9 682.40 -62.1 -54.4 -62.2 60 -99 SPO 1997 04 03 08 28 90 5.4 -9 682.40 -62.0 -54.4 -62.2 59 -99 SPO 1997 04 03 08 29 91 5.4 -9 682.40 -62.1 -54.3 -62.2 61 -99 SPO 1997 04 03 08 30 90 5.4 -9 682.40 -62.1 -54.3 -62.2 61 -99 SPO 1997 04 03 08 31 90 5.4 -9 682.40 -62.1 -54.2 -62.2 61 -99 SPO 1997 04 03 08 32 91 5.5 -9 682.40 -62.1 -54.1 -62.2 61 -99 SPO 1997 04 03 08 33 90 5.7 -9 682.40 -62.1 -54.1 -62.2 61 -99 SPO 1997 04 03 08 34 89 5.7 -9 682.40 -62.1 -54.2 -62.2 61 -99 SPO 1997 04 03 08 35 89 5.7 -9 682.40 -62.1 -54.2 -62.1 61 -99 SPO 1997 04 03 08 36 90 5.7 -9 682.40 -62.1 -54.3 -62.1 61 -99 SPO 1997 04 03 08 37 90 5.5 -9 682.40 -62.1 -54.4 -62.1 61 -99 SPO 1997 04 03 08 38 90 5.6 -9 682.40 -62.1 -54.5 -62.1 61 -99 SPO 1997 04 03 08 39 89 5.7 -9 682.40 -62.1 -54.4 -62.1 60 -99 SPO 1997 04 03 08 40 89 5.7 -9 682.40 -62.0 -54.4 -62.0 59 -99 SPO 1997 04 03 08 41 90 5.6 -9 682.40 -62.0 -54.6 -62.0 59 -99 SPO 1997 04 03 08 42 89 5.6 -9 682.40 -62.0 -54.6 -62.0 60 -99 SPO 1997 04 03 08 43 88 5.6 -9 682.40 -61.9 -54.7 -62.1 59 -99 SPO 1997 04 03 08 44 89 5.6 -9 682.40 -61.9 -54.6 -62.0 59 -99 SPO 1997 04 03 08 45 89 5.7 -9 682.40 -61.9 -54.6 -62.0 61 -99 SPO 1997 04 03 08 46 88 5.6 -9 682.40 -61.9 -54.5 -62.0 61 -99 SPO 1997 04 03 08 47 88 5.6 -9 682.40 -61.9 -54.5 -62.0 61 -99 SPO 1997 04 03 08 48 89 5.5 -9 682.40 -61.9 -54.6 -62.0 61 -99 SPO 1997 04 03 08 49 90 5.3 -9 682.50 -62.0 -54.8 -62.0 61 -99 SPO 1997 04 03 08 50 93 5.2 -9 682.50 -62.0 -55.2 -62.2 61 -99 SPO 1997 04 03 08 51 95 5.1 -9 682.50 -62.1 -56.0 -62.2 61 -99 SPO 1997 04 03 08 52 97 5.0 -9 682.50 -62.2 -56.6 -62.3 61 -99 SPO 1997 04 03 08 53 98 5.0 -9 682.50 -62.3 -57.0 -62.3 59 -99 SPO 1997 04 03 08 54 99 4.9 -9 682.50 -62.3 -57.4 -62.3 58 -99 SPO 1997 04 03 08 55 101 4.8 -9 682.50 -62.4 -57.6 -62.4 59 -99 SPO 1997 04 03 08 56 103 4.8 -9 682.50 -62.3 -57.9 -62.4 58 -99 SPO 1997 04 03 08 57 103 4.9 -9 682.50 -62.4 -58.0 -62.5 59 -99 SPO 1997 04 03 08 58 102 4.9 -9 682.50 -62.5 -58.0 -62.5 60 -99 SPO 1997 04 03 08 59 103 4.9 -9 682.50 -62.5 -57.9 -62.6 60 -99 SPO 1997 04 03 09 00 104 4.7 -9 682.50 -62.6 -58.0 -62.6 61 0 SPO 1997 04 03 09 01 107 4.5 -9 682.50 -62.6 -58.2 -62.6 61 -99 SPO 1997 04 03 09 02 108 4.4 -9 682.50 -62.7 -58.5 -62.7 59 -99 SPO 1997 04 03 09 03 110 4.3 -9 682.50 -62.8 -58.8 -62.8 59 -99 SPO 1997 04 03 09 04 112 4.1 -9 682.50 -63.0 -59.0 -63.0 60 -99 SPO 1997 04 03 09 05 112 4.0 -9 682.60 -63.1 -59.1 -63.1 58 -99 SPO 1997 04 03 09 06 113 3.9 -9 682.60 -63.2 -59.2 -63.1 57 -99 SPO 1997 04 03 09 07 116 3.8 -9 682.60 -63.3 -59.3 -63.2 58 -99 SPO 1997 04 03 09 08 114 4.0 -9 682.60 -63.3 -59.3 -63.2 58 -99 SPO 1997 04 03 09 09 111 4.2 -9 682.60 -63.3 -59.3 -63.2 59 -99 SPO 1997 04 03 09 10 110 4.1 -9 682.60 -63.3 -59.3 -63.2 59 -99 SPO 1997 04 03 09 11 110 4.1 -9 682.60 -63.3 -59.3 -63.2 60 -99 SPO 1997 04 03 09 12 111 4.0 -9 682.60 -63.2 -59.3 -63.2 59 -99 SPO 1997 04 03 09 13 111 4.3 -9 682.60 -63.2 -59.3 -63.1 58 -99 SPO 1997 04 03 09 14 110 4.4 -9 682.60 -63.1 -59.3 -63.1 57 -99 SPO 1997 04 03 09 15 109 4.5 -9 682.60 -63.0 -59.2 -63.0 57 -99 SPO 1997 04 03 09 16 110 4.5 -9 682.60 -63.0 -59.2 -62.9 57 -99 SPO 1997 04 03 09 17 111 4.5 -9 682.60 -62.9 -59.3 -62.9 56 -99 SPO 1997 04 03 09 18 110 4.6 -9 682.60 -62.9 -59.4 -62.9 57 -99 SPO 1997 04 03 09 19 108 4.6 -9 682.60 -62.9 -59.4 -63.0 57 -99 SPO 1997 04 03 09 20 109 4.6 -9 682.70 -62.9 -59.4 -63.0 59 -99 SPO 1997 04 03 09 21 111 4.5 -9 682.70 -63.0 -59.5 -63.0 60 -99 SPO 1997 04 03 09 22 109 4.6 -9 682.70 -63.0 -59.5 -63.1 60 -99 SPO 1997 04 03 09 23 108 4.5 -9 682.70 -63.0 -59.5 -63.0 60 -99 SPO 1997 04 03 09 24 107 4.6 -9 682.60 -62.9 -59.4 -63.0 59 -99 SPO 1997 04 03 09 25 106 4.7 -9 682.70 -62.8 -59.4 -62.9 58 -99 SPO 1997 04 03 09 26 105 4.9 -9 682.70 -62.9 -59.4 -62.9 59 -99 SPO 1997 04 03 09 27 105 4.9 -9 682.60 -62.8 -59.4 -62.9 58 -99 SPO 1997 04 03 09 28 104 5.0 -9 682.60 -62.8 -59.4 -62.8 59 -99 SPO 1997 04 03 09 29 104 5.0 -9 682.60 -62.7 -59.4 -62.8 58 -99 SPO 1997 04 03 09 30 104 5.1 -9 682.70 -62.7 -59.4 -62.7 61 -99 SPO 1997 04 03 09 31 104 5.1 -9 682.70 -62.6 -59.4 -62.7 61 -99 SPO 1997 04 03 09 32 104 5.1 -9 682.60 -62.6 -59.3 -62.6 61 -99 SPO 1997 04 03 09 33 104 5.2 -9 682.70 -62.5 -59.4 -62.6 60 -99 SPO 1997 04 03 09 34 103 5.2 -9 682.70 -62.5 -59.4 -62.6 60 -99 SPO 1997 04 03 09 35 103 5.2 -9 682.60 -62.5 -59.4 -62.6 60 -99 SPO 1997 04 03 09 36 103 5.3 -9 682.60 -62.5 -59.5 -62.6 61 -99 SPO 1997 04 03 09 37 103 5.3 -9 682.60 -62.5 -59.5 -62.6 63 -99 SPO 1997 04 03 09 38 103 5.4 -9 682.60 -62.5 -59.5 -62.6 61 -99 SPO 1997 04 03 09 39 100 5.4 -9 682.60 -62.5 -59.4 -62.5 61 -99 SPO 1997 04 03 09 40 97 5.4 -9 682.60 -62.4 -59.1 -62.4 62 -99 SPO 1997 04 03 09 41 97 5.5 -9 682.60 -62.3 -58.9 -62.4 59 -99 SPO 1997 04 03 09 42 96 5.6 -9 682.60 -62.2 -58.6 -62.4 61 -99 SPO 1997 04 03 09 43 94 5.7 -9 682.60 -62.2 -58.2 -62.4 61 -99 SPO 1997 04 03 09 44 93 5.7 -9 682.60 -62.3 -57.9 -62.4 62 -99 SPO 1997 04 03 09 45 93 5.8 -9 682.60 -62.3 -57.8 -62.4 62 -99 SPO 1997 04 03 09 46 92 5.7 -9 682.60 -62.3 -57.6 -62.4 62 -99 SPO 1997 04 03 09 47 92 5.7 -9 682.50 -62.3 -57.4 -62.4 62 -99 SPO 1997 04 03 09 48 91 5.8 -9 682.50 -62.3 -57.4 -62.4 61 -99 SPO 1997 04 03 09 49 91 5.9 -9 682.50 -62.3 -57.4 -62.4 61 -99 SPO 1997 04 03 09 50 90 5.9 -9 682.50 -62.3 -57.4 -62.4 61 -99 SPO 1997 04 03 09 51 89 5.9 -9 682.50 -62.4 -57.5 -62.5 62 -99 SPO 1997 04 03 09 52 89 6.0 -9 682.50 -62.4 -57.5 -62.5 62 -99 SPO 1997 04 03 09 53 89 6.2 -9 682.50 -62.4 -57.5 -62.5 62 -99 SPO 1997 04 03 09 54 89 6.2 -9 682.50 -62.4 -57.5 -62.5 63 -99 SPO 1997 04 03 09 55 89 6.2 -9 682.50 -62.4 -57.5 -62.4 63 -99 SPO 1997 04 03 09 56 88 6.2 -9 682.50 -62.4 -57.6 -62.4 63 -99 SPO 1997 04 03 09 57 88 6.2 -9 682.50 -62.2 -57.6 -62.4 61 -99 SPO 1997 04 03 09 58 88 6.1 -9 682.50 -62.2 -57.6 -62.4 61 -99 SPO 1997 04 03 09 59 88 6.1 -9 682.50 -62.3 -57.6 -62.4 63 -99 SPO 1997 04 03 10 00 89 6.1 -9 682.50 -62.3 -57.7 -62.4 63 0 SPO 1997 04 03 10 01 89 6.1 -9 682.50 -62.3 -57.8 -62.4 62 -99 SPO 1997 04 03 10 02 89 6.1 -9 682.50 -62.3 -57.9 -62.4 62 -99 SPO 1997 04 03 10 03 87 6.2 -9 682.50 -62.3 -57.9 -62.4 61 -99 SPO 1997 04 03 10 04 88 6.1 -9 682.50 -62.3 -57.9 -62.5 61 -99 SPO 1997 04 03 10 05 88 6.0 -9 682.50 -62.3 -58.0 -62.5 59 -99 SPO 1997 04 03 10 06 88 5.9 -9 682.50 -62.4 -58.0 -62.5 62 -99 SPO 1997 04 03 10 07 90 5.8 -9 682.60 -62.5 -58.4 -62.5 63 -99 SPO 1997 04 03 10 08 91 5.6 -9 682.60 -62.5 -58.9 -62.5 64 -99 SPO 1997 04 03 10 09 91 5.5 -9 682.60 -62.6 -59.2 -62.6 65 -99 SPO 1997 04 03 10 10 92 5.4 -9 682.60 -62.6 -59.4 -62.6 64 -99 SPO 1997 04 03 10 11 92 5.4 -9 682.60 -62.6 -59.5 -62.7 64 -99 SPO 1997 04 03 10 12 91 5.4 -9 682.50 -62.6 -59.6 -62.8 61 -99 SPO 1997 04 03 10 13 91 5.3 -9 682.50 -62.7 -59.6 -62.8 61 -99 SPO 1997 04 03 10 14 91 5.2 -9 682.50 -62.8 -59.7 -62.9 61 -99 SPO 1997 04 03 10 15 91 5.0 -9 682.50 -62.8 -59.7 -63.0 60 -99 SPO 1997 04 03 10 16 91 5.0 -9 682.50 -62.9 -59.8 -63.0 60 -99 SPO 1997 04 03 10 17 91 4.8 -9 682.50 -62.9 -59.8 -63.0 60 -99 SPO 1997 04 03 10 18 91 4.8 -9 682.50 -63.0 -59.8 -63.0 60 -99 SPO 1997 04 03 10 19 92 4.8 -9 682.50 -63.0 -59.8 -63.0 60 -99 SPO 1997 04 03 10 20 92 4.7 -9 682.50 -63.0 -59.8 -63.0 60 -99 SPO 1997 04 03 10 21 93 4.6 -9 682.50 -63.0 -59.8 -63.0 60 -99 SPO 1997 04 03 10 22 92 4.6 -9 682.60 -63.0 -59.8 -63.0 60 -99 SPO 1997 04 03 10 23 92 4.6 -9 682.50 -63.0 -59.8 -63.1 60 -99 SPO 1997 04 03 10 24 92 4.7 -9 682.50 -63.0 -59.7 -63.1 60 -99 SPO 1997 04 03 10 25 92 4.8 -9 682.60 -63.0 -59.6 -63.1 60 -99 SPO 1997 04 03 10 26 92 4.9 -9 682.60 -63.1 -59.5 -63.1 60 -99 SPO 1997 04 03 10 27 93 5.0 -9 682.60 -63.1 -59.1 -63.1 60 -99 SPO 1997 04 03 10 28 94 4.9 -9 682.60 -63.1 -58.7 -63.1 60 -99 SPO 1997 04 03 10 29 95 4.9 -9 682.60 -63.1 -58.6 -63.2 60 -99 SPO 1997 04 03 10 30 97 4.9 -9 682.60 -63.1 -58.8 -63.2 60 -99 SPO 1997 04 03 10 31 97 4.9 -9 682.60 -63.1 -58.7 -63.2 60 -99 SPO 1997 04 03 10 32 100 5.0 -9 682.60 -63.1 -58.5 -63.2 60 -99 SPO 1997 04 03 10 33 101 5.2 -9 682.60 -63.1 -58.5 -63.2 60 -99 SPO 1997 04 03 10 34 99 5.2 -9 682.60 -63.1 -58.2 -63.2 60 -99 SPO 1997 04 03 10 35 99 5.3 -9 682.60 -63.1 -58.0 -63.2 60 -99 SPO 1997 04 03 10 36 98 5.3 -9 682.60 -63.1 -57.8 -63.1 60 -99 SPO 1997 04 03 10 37 97 5.3 -9 682.60 -63.0 -57.6 -63.1 60 -99 SPO 1997 04 03 10 38 99 5.2 -9 682.60 -63.0 -57.4 -63.0 60 -99 SPO 1997 04 03 10 39 99 5.1 -9 682.60 -62.9 -57.4 -63.0 59 -99 SPO 1997 04 03 10 40 99 5.0 -9 682.60 -62.8 -57.3 -62.9 59 -99 SPO 1997 04 03 10 41 101 5.0 -9 682.60 -62.8 -57.4 -62.9 59 -99 SPO 1997 04 03 10 42 102 5.0 -9 682.60 -62.8 -57.5 -62.9 60 -99 SPO 1997 04 03 10 43 101 5.0 -9 682.60 -62.8 -57.6 -62.9 61 -99 SPO 1997 04 03 10 44 102 5.0 -9 682.60 -62.8 -57.7 -63.0 61 -99 SPO 1997 04 03 10 45 102 5.0 -9 682.60 -62.8 -57.8 -62.9 62 -99 SPO 1997 04 03 10 46 103 5.0 -9 682.60 -62.8 -57.8 -62.9 62 -99 SPO 1997 04 03 10 47 103 5.0 -9 682.60 -62.8 -58.0 -62.9 61 -99 SPO 1997 04 03 10 48 104 5.0 -9 682.60 -62.8 -58.0 -62.8 61 -99 SPO 1997 04 03 10 49 103 5.0 -9 682.60 -62.7 -58.0 -62.8 59 -99 SPO 1997 04 03 10 50 101 5.0 -9 682.60 -62.6 -57.9 -62.7 60 -99 SPO 1997 04 03 10 51 100 5.0 -9 682.60 -62.6 -57.8 -62.7 60 -99 SPO 1997 04 03 10 52 100 5.0 -9 682.70 -62.6 -57.7 -62.7 61 -99 SPO 1997 04 03 10 53 100 4.9 -9 682.60 -62.6 -57.6 -62.6 61 -99 SPO 1997 04 03 10 54 102 4.8 -9 682.60 -62.6 -57.6 -62.6 64 -99 SPO 1997 04 03 10 55 103 4.8 -9 682.70 -62.6 -57.9 -62.6 65 -99 SPO 1997 04 03 10 56 103 4.7 -9 682.70 -62.6 -58.4 -62.6 65 -99 SPO 1997 04 03 10 57 102 4.6 -9 682.70 -62.5 -58.7 -62.7 64 -99 SPO 1997 04 03 10 58 102 4.5 -9 682.70 -62.5 -58.6 -62.6 64 -99 SPO 1997 04 03 10 59 102 4.5 -9 682.70 -62.6 -58.4 -62.6 64 -99 SPO 1997 04 03 11 00 102 4.4 -9 682.70 -62.6 -58.5 -62.7 64 0 SPO 1997 04 03 11 01 103 4.4 -9 682.70 -62.6 -58.7 -62.7 61 -99 SPO 1997 04 03 11 02 102 4.5 -9 682.70 -62.6 -58.8 -62.7 61 -99 SPO 1997 04 03 11 03 101 4.5 -9 682.70 -62.6 -58.6 -62.7 61 -99 SPO 1997 04 03 11 04 100 4.6 -9 682.70 -62.6 -58.5 -62.6 61 -99 SPO 1997 04 03 11 05 100 4.6 -9 682.70 -62.6 -58.8 -62.6 61 -99 SPO 1997 04 03 11 06 102 4.6 -9 682.80 -62.6 -59.1 -62.7 61 -99 SPO 1997 04 03 11 07 103 4.6 -9 682.80 -62.7 -59.2 -62.7 62 -99 SPO 1997 04 03 11 08 104 4.6 -9 682.80 -62.7 -59.2 -62.7 65 -99 SPO 1997 04 03 11 09 104 4.6 -9 682.80 -62.7 -59.3 -62.7 65 -99 SPO 1997 04 03 11 10 104 4.6 -9 682.80 -62.7 -59.6 -62.8 65 -99 SPO 1997 04 03 11 11 104 4.7 -9 682.80 -62.6 -59.8 -62.7 61 -99 SPO 1997 04 03 11 12 105 4.7 -9 682.80 -62.7 -59.9 -62.7 62 -99 SPO 1997 04 03 11 13 105 4.7 -9 682.80 -62.7 -60.0 -62.7 61 -99 SPO 1997 04 03 11 14 105 4.8 -9 682.80 -62.7 -60.0 -62.7 61 -99 SPO 1997 04 03 11 15 106 4.8 -9 682.80 -62.7 -60.0 -62.7 61 -99 SPO 1997 04 03 11 16 106 4.8 -9 682.80 -62.7 -60.1 -62.7 61 -99 SPO 1997 04 03 11 17 108 4.8 -9 682.80 -62.7 -60.2 -62.7 61 -99 SPO 1997 04 03 11 18 107 5.0 -9 682.80 -62.7 -60.2 -62.7 62 -99 SPO 1997 04 03 11 19 106 5.1 -9 682.80 -62.6 -60.2 -62.6 61 -99 SPO 1997 04 03 11 20 106 5.1 -9 682.80 -62.6 -60.2 -62.6 64 -99 SPO 1997 04 03 11 21 106 5.1 -9 682.80 -62.5 -60.3 -62.6 63 -99 SPO 1997 04 03 11 22 107 5.1 -9 682.80 -62.5 -60.3 -62.5 64 -99 SPO 1997 04 03 11 23 109 5.1 -9 682.80 -62.4 -60.4 -62.4 63 -99 SPO 1997 04 03 11 24 109 5.1 -9 682.80 -62.4 -60.4 -62.4 63 -99 SPO 1997 04 03 11 25 109 5.1 -9 682.80 -62.4 -60.4 -62.4 64 -99 SPO 1997 04 03 11 26 107 5.1 -9 682.80 -62.3 -60.5 -62.4 64 -99 SPO 1997 04 03 11 27 106 5.1 -9 682.80 -62.2 -60.5 -62.4 62 -99 SPO 1997 04 03 11 28 105 5.2 -9 682.80 -62.2 -60.5 -62.4 62 -99 SPO 1997 04 03 11 29 104 5.3 -9 682.80 -62.2 -60.5 -62.4 63 -99 SPO 1997 04 03 11 30 104 5.3 -9 682.80 -62.2 -60.5 -62.4 65 -99 SPO 1997 04 03 11 31 103 5.4 -9 682.80 -62.3 -60.5 -62.4 66 -99 SPO 1997 04 03 11 32 104 5.2 -9 682.80 -62.3 -60.5 -62.4 66 -99 SPO 1997 04 03 11 33 104 5.2 -9 682.80 -62.3 -60.4 -62.4 66 -99 SPO 1997 04 03 11 34 103 5.2 -9 682.80 -62.3 -60.4 -62.4 66 -99 SPO 1997 04 03 11 35 102 5.1 -9 682.90 -62.2 -60.4 -62.4 63 -99 SPO 1997 04 03 11 36 102 5.0 -9 682.90 -62.3 -60.4 -62.5 63 -99 SPO 1997 04 03 11 37 103 4.8 -9 682.90 -62.4 -60.4 -62.5 63 -99 SPO 1997 04 03 11 38 103 4.8 -9 682.90 -62.4 -60.5 -62.5 63 -99 SPO 1997 04 03 11 39 102 4.8 -9 682.90 -62.4 -60.5 -62.5 63 -99 SPO 1997 04 03 11 40 102 4.8 -9 682.90 -62.5 -60.6 -62.6 64 -99 SPO 1997 04 03 11 41 101 4.8 -9 682.90 -62.4 -60.6 -62.6 63 -99 SPO 1997 04 03 11 42 101 4.8 -9 682.90 -62.4 -60.5 -62.6 63 -99 SPO 1997 04 03 11 43 102 4.8 -9 682.90 -62.5 -60.5 -62.6 64 -99 SPO 1997 04 03 11 44 103 4.8 -9 682.90 -62.5 -60.5 -62.6 64 -99 SPO 1997 04 03 11 45 104 4.7 -9 682.90 -62.6 -60.6 -62.7 65 -99 SPO 1997 04 03 11 46 105 4.6 -9 682.90 -62.6 -60.6 -62.7 65 -99 SPO 1997 04 03 11 47 106 4.5 -9 683.00 -62.7 -60.6 -62.7 65 -99 SPO 1997 04 03 11 48 107 4.4 -9 683.00 -62.7 -60.6 -62.8 61 -99 SPO 1997 04 03 11 49 108 4.4 -9 683.00 -62.8 -60.6 -62.8 62 -99 SPO 1997 04 03 11 50 107 4.5 -9 683.00 -62.8 -60.6 -62.9 62 -99 SPO 1997 04 03 11 51 107 4.6 -9 683.00 -62.9 -60.5 -63.0 62 -99 SPO 1997 04 03 11 52 107 4.6 -9 682.90 -62.9 -60.5 -63.0 62 -99 SPO 1997 04 03 11 53 108 4.6 -9 682.90 -62.9 -60.4 -63.0 62 -99 SPO 1997 04 03 11 54 106 4.7 -9 682.90 -63.0 -60.4 -63.0 63 -99 SPO 1997 04 03 11 55 104 4.7 -9 682.90 -63.0 -60.3 -63.0 64 -99 SPO 1997 04 03 11 56 103 4.7 -9 682.90 -63.0 -60.2 -63.0 64 -99 SPO 1997 04 03 11 57 103 4.8 -9 682.90 -63.0 -60.2 -63.0 63 -99 SPO 1997 04 03 11 58 103 4.8 -9 682.90 -63.0 -60.0 -63.0 63 -99 SPO 1997 04 03 11 59 103 4.9 -9 682.90 -63.0 -59.8 -63.0 64 -99 SPO 1997 04 03 12 00 101 4.9 -9 682.90 -63.0 -59.6 -63.0 63 0 SPO 1997 04 03 12 01 100 4.9 -9 682.90 -63.0 -59.4 -63.0 63 -99 SPO 1997 04 03 12 02 100 5.1 -9 682.90 -63.0 -59.4 -62.9 61 -99 SPO 1997 04 03 12 03 101 5.2 -9 682.90 -62.9 -59.2 -62.9 60 -99 SPO 1997 04 03 12 04 101 5.2 -9 682.90 -62.9 -59.2 -62.9 60 -99 SPO 1997 04 03 12 05 100 5.2 -9 682.90 -62.9 -59.2 -62.9 62 -99 SPO 1997 04 03 12 06 99 5.1 -9 682.90 -62.8 -59.1 -62.8 62 -99 SPO 1997 04 03 12 07 100 5.2 -9 682.90 -62.8 -59.2 -62.7 62 -99 SPO 1997 04 03 12 08 100 5.3 -9 682.90 -62.8 -59.1 -62.7 63 -99 SPO 1997 04 03 12 09 99 5.3 -9 682.90 -62.7 -59.1 -62.6 62 -99 SPO 1997 04 03 12 10 97 5.3 -9 682.90 -62.6 -59.1 -62.7 61 -99 SPO 1997 04 03 12 11 97 5.2 -9 682.90 -62.6 -59.1 -62.7 61 -99 SPO 1997 04 03 12 12 97 5.2 -9 682.80 -62.7 -59.2 -62.8 62 -99 SPO 1997 04 03 12 13 96 5.2 -9 682.90 -62.7 -59.4 -62.8 62 -99 SPO 1997 04 03 12 14 97 5.2 -9 682.90 -62.7 -59.5 -62.8 62 -99 SPO 1997 04 03 12 15 96 5.3 -9 682.80 -62.7 -59.6 -62.8 61 -99 SPO 1997 04 03 12 16 94 5.2 -9 682.90 -62.8 -59.6 -62.8 62 -99 SPO 1997 04 03 12 17 95 5.3 -9 682.90 -62.8 -59.7 -62.9 62 -99 SPO 1997 04 03 12 18 96 5.3 -9 682.90 -62.8 -59.7 -63.0 62 -99 SPO 1997 04 03 12 19 94 5.2 -9 682.90 -62.8 -59.8 -63.0 62 -99 SPO 1997 04 03 12 20 96 5.4 -9 682.90 -62.9 -59.9 -63.0 63 -99 SPO 1997 04 03 12 21 96 5.4 -9 682.90 -63.0 -59.9 -63.0 64 -99 SPO 1997 04 03 12 22 95 5.4 -9 682.90 -63.0 -59.9 -63.1 63 -99 SPO 1997 04 03 12 23 94 5.4 -9 682.90 -63.0 -59.9 -63.1 63 -99 SPO 1997 04 03 12 24 93 5.5 -9 682.90 -63.0 -59.8 -63.1 61 -99 SPO 1997 04 03 12 25 93 5.5 -9 682.90 -63.1 -59.7 -63.1 61 -99 SPO 1997 04 03 12 26 93 5.4 -9 682.90 -63.0 -59.6 -63.1 60 -99 SPO 1997 04 03 12 27 92 5.2 -9 682.90 -63.1 -59.7 -63.1 61 -99 SPO 1997 04 03 12 28 91 5.1 -9 682.90 -63.1 -59.8 -63.1 61 -99 SPO 1997 04 03 12 29 92 5.2 -9 682.90 -63.1 -59.9 -63.1 61 -99 SPO 1997 04 03 12 30 90 5.2 -9 682.90 -63.1 -60.0 -63.1 62 -99 SPO 1997 04 03 12 31 91 5.0 -9 682.90 -63.1 -59.9 -63.1 62 -99 SPO 1997 04 03 12 32 90 4.9 -9 682.90 -63.1 -59.9 -63.1 61 -99 SPO 1997 04 03 12 33 93 4.8 -9 682.90 -63.1 -60.0 -63.1 61 -99 SPO 1997 04 03 12 34 95 4.7 -9 683.00 -63.1 -60.1 -63.2 61 -99 SPO 1997 04 03 12 35 96 4.5 -9 683.00 -63.1 -60.2 -63.2 60 -99 SPO 1997 04 03 12 36 97 4.4 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 37 96 4.4 -9 683.00 -63.1 -60.4 -63.1 61 -99 SPO 1997 04 03 12 38 94 4.3 -9 683.00 -63.0 -60.5 -63.0 60 -99 SPO 1997 04 03 12 39 91 4.1 -9 683.00 -63.0 -60.5 -63.0 60 -99 SPO 1997 04 03 12 40 96 4.2 -9 683.00 -63.0 -60.5 -63.0 60 -99 SPO 1997 04 03 12 41 96 4.1 -9 683.00 -63.0 -60.5 -63.0 61 -99 SPO 1997 04 03 12 42 96 4.0 -9 683.00 -63.0 -60.4 -63.0 63 -99 SPO 1997 04 03 12 43 96 4.1 -9 683.00 -62.9 -60.4 -63.0 62 -99 SPO 1997 04 03 12 44 97 4.4 -9 683.00 -62.9 -60.3 -63.0 62 -99 SPO 1997 04 03 12 45 96 4.3 -9 683.00 -63.0 -60.3 -63.0 63 -99 SPO 1997 04 03 12 46 94 4.4 -9 683.00 -63.0 -60.3 -63.1 61 -99 SPO 1997 04 03 12 47 97 4.4 -9 683.00 -63.1 -60.4 -63.2 61 -99 SPO 1997 04 03 12 48 95 4.4 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 49 97 4.5 -9 683.00 -63.2 -60.5 -63.2 61 -99 SPO 1997 04 03 12 50 98 4.5 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 51 96 4.6 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 52 96 4.8 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 53 95 4.9 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 54 94 4.9 -9 683.00 -63.2 -60.4 -63.2 61 -99 SPO 1997 04 03 12 55 95 5.0 -9 683.00 -63.1 -60.4 -63.1 61 -99 SPO 1997 04 03 12 56 94 5.0 -9 683.00 -63.1 -60.4 -63.1 62 -99 SPO 1997 04 03 12 57 93 5.0 -9 683.00 -63.1 -60.4 -63.1 62 -99 SPO 1997 04 03 12 58 94 5.1 -9 683.00 -63.1 -60.4 -63.1 62 -99 SPO 1997 04 03 12 59 92 5.0 -9 683.00 -63.1 -60.3 -63.2 62 -99 SPO 1997 04 03 13 00 92 5.2 -9 683.00 -63.1 -60.4 -63.2 61 0 SPO 1997 04 03 13 01 92 5.4 -9 682.90 -63.1 -60.4 -63.2 61 -99 SPO 1997 04 03 13 02 91 5.5 -9 682.90 -63.1 -60.4 -63.1 60 -99 SPO 1997 04 03 13 03 90 5.5 -9 682.90 -63.1 -60.3 -63.2 60 -99 SPO 1997 04 03 13 04 88 5.4 -9 682.90 -63.1 -60.4 -63.2 61 -99 SPO 1997 04 03 13 05 88 5.3 -9 682.90 -63.1 -60.5 -63.2 62 -99 SPO 1997 04 03 13 06 88 5.2 -9 682.90 -63.0 -60.5 -63.1 63 -99 SPO 1997 04 03 13 07 88 5.2 -9 682.90 -63.0 -60.6 -63.1 63 -99 SPO 1997 04 03 13 08 88 5.3 -9 682.90 -63.0 -60.5 -63.1 64 -99 SPO 1997 04 03 13 09 88 5.4 -9 682.90 -63.0 -60.4 -63.1 64 -99 SPO 1997 04 03 13 10 86 5.2 -9 682.90 -63.0 -60.4 -63.1 63 -99 SPO 1997 04 03 13 11 87 5.0 -9 682.90 -63.0 -60.4 -63.1 63 -99 SPO 1997 04 03 13 12 87 5.0 -9 682.90 -63.0 -60.4 -63.2 61 -99 SPO 1997 04 03 13 13 86 5.0 -9 682.90 -63.0 -60.4 -63.2 60 -99 SPO 1997 04 03 13 14 85 5.1 -9 682.90 -63.1 -60.3 -63.2 61 -99 SPO 1997 04 03 13 15 83 5.3 -9 682.90 -63.0 -60.2 -63.2 60 -99 SPO 1997 04 03 13 16 83 5.7 -9 682.90 -63.0 -60.0 -63.1 61 -99 SPO 1997 04 03 13 17 82 5.7 -9 682.90 -63.0 -59.8 -63.1 61 -99 SPO 1997 04 03 13 18 82 5.9 -9 682.80 -63.0 -59.7 -63.1 63 -99 SPO 1997 04 03 13 19 81 6.1 -9 682.80 -63.0 -59.7 -63.1 64 -99 SPO 1997 04 03 13 20 79 6.1 -9 682.80 -63.0 -59.6 -63.1 64 -99 SPO 1997 04 03 13 21 80 6.0 -9 682.80 -62.9 -59.6 -63.1 62 -99 SPO 1997 04 03 13 22 80 6.1 -9 682.80 -62.9 -59.6 -63.1 62 -99 SPO 1997 04 03 13 23 80 6.1 -9 682.80 -62.9 -59.7 -63.1 62 -99 SPO 1997 04 03 13 24 79 6.2 -9 682.80 -62.9 -59.6 -63.1 60 -99 SPO 1997 04 03 13 25 80 6.3 -9 682.80 -63.0 -59.7 -63.1 61 -99 SPO 1997 04 03 13 26 79 6.4 -9 682.80 -63.0 -59.6 -63.1 63 -99 SPO 1997 04 03 13 27 78 6.3 -9 682.80 -63.0 -59.6 -63.1 63 -99 SPO 1997 04 03 13 28 78 6.5 -9 682.80 -63.0 -59.6 -63.1 64 -99 SPO 1997 04 03 13 29 79 6.5 -9 682.80 -63.0 -59.6 -63.1 64 -99 SPO 1997 04 03 13 30 78 6.3 -9 682.80 -63.0 -59.7 -63.1 64 -99 SPO 1997 04 03 13 31 79 6.3 -9 682.80 -63.0 -59.7 -63.1 64 -99 SPO 1997 04 03 13 32 81 6.2 -9 682.80 -63.0 -59.8 -63.1 64 -99 SPO 1997 04 03 13 33 80 5.9 -9 682.80 -63.0 -60.0 -63.1 63 -99 SPO 1997 04 03 13 34 82 5.7 -9 682.80 -63.0 -60.2 -63.2 61 -99 SPO 1997 04 03 13 35 82 5.6 -9 682.80 -63.0 -60.4 -63.1 61 -99 SPO 1997 04 03 13 36 82 5.5 -9 682.80 -63.0 -60.6 -63.1 61 -99 SPO 1997 04 03 13 37 82 5.2 -9 682.80 -63.0 -60.7 -63.2 61 -99 SPO 1997 04 03 13 38 83 5.2 -9 682.80 -63.0 -60.8 -63.2 61 -99 SPO 1997 04 03 13 39 84 5.3 -9 682.80 -63.1 -60.9 -63.2 62 -99 SPO 1997 04 03 13 40 84 5.2 -9 682.80 -63.1 -60.9 -63.2 62 -99 SPO 1997 04 03 13 41 82 5.3 -9 682.80 -63.1 -60.9 -63.2 62 -99 SPO 1997 04 03 13 42 82 5.3 -9 682.80 -63.2 -61.0 -63.3 63 -99 SPO 1997 04 03 13 43 82 5.4 -9 682.80 -63.2 -61.0 -63.3 63 -99 SPO 1997 04 03 13 44 83 5.3 -9 682.80 -63.2 -61.1 -63.3 63 -99 SPO 1997 04 03 13 45 86 5.1 -9 682.80 -63.2 -61.1 -63.4 62 -99 SPO 1997 04 03 13 46 87 5.0 -9 682.80 -63.3 -61.2 -63.4 63 -99 SPO 1997 04 03 13 47 88 4.9 -9 682.90 -63.3 -61.3 -63.4 62 -99 SPO 1997 04 03 13 48 88 4.8 -9 682.90 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 49 86 5.0 -9 682.90 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 50 84 5.1 -9 682.80 -63.3 -61.5 -63.4 62 -99 SPO 1997 04 03 13 51 82 5.2 -9 682.80 -63.3 -61.5 -63.4 62 -99 SPO 1997 04 03 13 52 82 5.2 -9 682.80 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 53 82 5.2 -9 682.90 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 54 82 5.1 -9 682.90 -63.4 -61.4 -63.4 63 -99 SPO 1997 04 03 13 55 84 5.1 -9 682.90 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 56 85 5.1 -9 682.90 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 57 86 5.0 -9 682.90 -63.3 -61.4 -63.4 62 -99 SPO 1997 04 03 13 58 86 5.0 -9 682.90 -63.3 -61.4 -63.4 61 -99 SPO 1997 04 03 13 59 86 4.9 -9 682.90 -63.3 -61.5 -63.4 61 -99 SPO 1997 04 03 14 00 86 5.2 -9 682.90 -63.4 -61.5 -63.4 62 0 SPO 1997 04 03 14 01 85 5.2 -9 682.90 -63.3 -61.5 -63.4 60 -99 SPO 1997 04 03 14 02 85 5.3 -9 682.90 -63.3 -61.6 -63.4 61 -99 SPO 1997 04 03 14 03 84 5.3 -9 682.90 -63.3 -61.6 -63.4 62 -99 SPO 1997 04 03 14 04 83 5.3 -9 683.00 -63.3 -61.6 -63.4 62 -99 SPO 1997 04 03 14 05 84 5.2 -9 683.00 -63.3 -61.7 -63.4 63 -99 SPO 1997 04 03 14 06 83 5.2 -9 683.00 -63.3 -61.7 -63.4 63 -99 SPO 1997 04 03 14 07 84 5.1 -9 683.00 -63.3 -61.7 -63.4 63 -99 SPO 1997 04 03 14 08 83 5.1 -9 683.00 -63.3 -61.7 -63.4 63 -99 SPO 1997 04 03 14 09 84 5.3 -9 683.00 -63.3 -61.7 -63.4 62 -99 SPO 1997 04 03 14 10 85 5.4 -9 683.00 -63.3 -61.7 -63.4 62 -99 SPO 1997 04 03 14 11 85 5.5 -9 683.00 -63.3 -61.7 -63.4 62 -99 SPO 1997 04 03 14 12 85 5.6 -9 683.00 -63.3 -61.7 -63.4 62 -99 SPO 1997 04 03 14 13 84 5.7 -9 683.00 -63.3 -61.6 -63.4 63 -99 SPO 1997 04 03 14 14 84 5.8 -9 683.00 -63.2 -61.6 -63.3 63 -99 SPO 1997 04 03 14 15 84 5.9 -9 683.00 -63.2 -61.6 -63.2 63 -99 SPO 1997 04 03 14 16 83 5.8 -9 683.00 -63.1 -61.6 -63.2 64 -99 SPO 1997 04 03 14 17 84 5.7 -9 683.00 -63.1 -61.6 -63.2 65 -99 SPO 1997 04 03 14 18 83 5.6 -9 683.00 -63.2 -61.7 -63.3 65 -99 SPO 1997 04 03 14 19 83 5.7 -9 683.00 -63.2 -61.7 -63.3 65 -99 SPO 1997 04 03 14 20 83 5.8 -9 683.00 -63.1 -61.7 -63.3 65 -99 SPO 1997 04 03 14 21 83 5.7 -9 683.00 -63.2 -61.7 -63.3 63 -99 SPO 1997 04 03 14 22 84 5.7 -9 683.00 -63.2 -61.7 -63.3 62 -99 SPO 1997 04 03 14 23 84 5.8 -9 683.00 -63.2 -61.7 -63.3 62 -99 SPO 1997 04 03 14 24 84 5.9 -9 683.00 -63.2 -61.7 -63.4 62 -99 SPO 1997 04 03 14 25 84 6.0 -9 683.00 -63.2 -61.7 -63.4 63 -99 SPO 1997 04 03 14 26 85 5.9 -9 682.90 -63.2 -61.7 -63.4 63 -99 SPO 1997 04 03 14 27 84 5.9 -9 682.90 -63.3 -61.7 -63.4 64 -99 SPO 1997 04 03 14 28 84 5.9 -9 683.00 -63.3 -61.7 -63.4 64 -99 SPO 1997 04 03 14 29 84 5.8 -9 682.90 -63.3 -61.7 -63.4 64 -99 SPO 1997 04 03 14 30 85 5.8 -9 683.00 -63.3 -61.7 -63.4 63 -99 SPO 1997 04 03 14 31 84 5.7 -9 683.00 -63.3 -61.8 -63.4 63 -99 SPO 1997 04 03 14 32 85 5.6 -9 683.00 -63.4 -61.8 -63.5 63 -99 SPO 1997 04 03 14 33 83 5.5 -9 683.00 -63.4 -61.8 -63.5 63 -99 SPO 1997 04 03 14 34 84 5.5 -9 682.90 -63.4 -61.8 -63.5 63 -99 SPO 1997 04 03 14 35 83 5.5 -9 683.00 -63.4 -61.8 -63.5 63 -99 SPO 1997 04 03 14 36 84 5.5 -9 683.00 -63.4 -61.8 -63.5 63 -99 SPO 1997 04 03 14 37 83 5.6 -9 682.90 -63.5 -61.8 -63.6 64 -99 SPO 1997 04 03 14 38 81 5.6 -9 683.00 -63.5 -61.8 -63.6 64 -99 SPO 1997 04 03 14 39 81 5.5 -9 683.00 -63.5 -61.8 -63.6 64 -99 SPO 1997 04 03 14 40 80 5.5 -9 682.90 -63.6 -61.8 -63.7 65 -99 SPO 1997 04 03 14 41 79 5.5 -9 683.00 -63.6 -61.8 -63.7 65 -99 SPO 1997 04 03 14 42 80 5.4 -9 683.00 -63.6 -61.8 -63.7 64 -99 SPO 1997 04 03 14 43 79 5.3 -9 683.00 -63.7 -61.8 -63.8 64 -99 SPO 1997 04 03 14 44 79 5.2 -9 683.00 -63.7 -61.9 -63.8 63 -99 SPO 1997 04 03 14 45 80 5.2 -9 682.90 -63.8 -61.9 -63.8 62 -99 SPO 1997 04 03 14 46 80 5.1 -9 683.00 -63.8 -62.0 -63.8 62 -99 SPO 1997 04 03 14 47 80 4.9 -9 683.00 -63.8 -62.0 -63.8 62 -99 SPO 1997 04 03 14 48 81 4.8 -9 683.00 -63.8 -62.0 -63.9 62 -99 SPO 1997 04 03 14 49 81 4.7 -9 683.00 -63.8 -62.0 -63.9 62 -99 SPO 1997 04 03 14 50 83 4.6 -9 683.00 -63.9 -62.1 -64.0 63 -99 SPO 1997 04 03 14 51 84 4.6 -9 683.00 -63.9 -62.2 -64.0 63 -99 SPO 1997 04 03 14 52 85 4.5 -9 683.00 -64.0 -62.2 -64.1 63 -99 SPO 1997 04 03 14 53 86 4.4 -9 683.10 -64.0 -62.2 -64.1 63 -99 SPO 1997 04 03 14 54 86 4.2 -9 683.00 -64.1 -62.2 -64.1 63 -99 SPO 1997 04 03 14 55 88 4.2 -9 683.00 -64.0 -62.3 -64.1 63 -99 SPO 1997 04 03 14 56 88 4.2 -9 683.00 -64.1 -62.2 -64.1 61 -99 SPO 1997 04 03 14 57 88 4.2 -9 683.00 -64.1 -62.2 -64.1 61 -99 SPO 1997 04 03 14 58 88 4.2 -9 683.10 -64.1 -62.2 -64.1 61 -99 SPO 1997 04 03 14 59 90 4.0 -9 683.10 -64.1 -62.3 -64.1 60 -99 SPO 1997 04 03 15 00 93 3.8 -9 683.10 -64.1 -62.4 -64.1 60 0 SPO 1997 04 03 15 01 95 3.6 -9 683.10 -64.1 -62.4 -64.1 61 -99 SPO 1997 04 03 15 02 97 3.4 -9 683.20 -64.1 -62.5 -64.1 62 -99 SPO 1997 04 03 15 03 101 3.2 -9 683.20 -64.1 -62.5 -64.2 62 -99 SPO 1997 04 03 15 04 104 3.2 -9 683.20 -64.1 -62.4 -64.2 63 -99 SPO 1997 04 03 15 05 108 3.1 -9 683.20 -64.1 -62.5 -64.2 63 -99 SPO 1997 04 03 15 06 111 2.9 -9 683.20 -64.1 -62.5 -64.1 63 -99 SPO 1997 04 03 15 07 113 2.8 -9 683.20 -64.0 -62.5 -64.0 63 -99 SPO 1997 04 03 15 08 113 2.7 -9 683.20 -63.8 -62.5 -63.9 61 -99 SPO 1997 04 03 15 09 113 2.8 -9 683.20 -63.7 -62.5 -63.9 61 -99 SPO 1997 04 03 15 10 113 3.0 -9 683.20 -63.7 -62.5 -63.9 61 -99 SPO 1997 04 03 15 11 114 3.0 -9 683.20 -63.7 -62.5 -64.0 61 -99 SPO 1997 04 03 15 12 114 3.1 -9 683.20 -63.8 -62.5 -64.0 61 -99 SPO 1997 04 03 15 13 114 3.1 -9 683.20 -63.8 -62.5 -64.0 61 -99 SPO 1997 04 03 15 14 114 3.0 -9 683.20 -63.8 -62.5 -64.0 61 -99 SPO 1997 04 03 15 15 114 3.0 -9 683.20 -63.8 -62.6 -63.9 62 -99 SPO 1997 04 03 15 16 114 3.0 -9 683.20 -63.7 -62.6 -63.9 61 -99 SPO 1997 04 03 15 17 115 2.9 -9 683.20 -63.7 -62.6 -63.9 62 -99 SPO 1997 04 03 15 18 120 2.8 -9 683.20 -63.6 -62.6 -63.8 62 -99 SPO 1997 04 03 15 19 120 2.8 -9 683.20 -63.6 -62.6 -63.8 62 -99 SPO 1997 04 03 15 20 120 3.0 -9 683.20 -63.6 -62.6 -63.8 60 -99 SPO 1997 04 03 15 21 117 3.0 -9 683.20 -63.6 -62.6 -63.8 60 -99 SPO 1997 04 03 15 22 116 3.1 -9 683.20 -63.6 -62.6 -63.8 60 -99 SPO 1997 04 03 15 23 113 3.2 -9 683.20 -63.6 -62.6 -63.8 61 -99 SPO 1997 04 03 15 24 112 3.4 -9 683.20 -63.8 -62.5 -64.1 62 -99 SPO 1997 04 03 15 25 112 3.5 -9 683.20 -64.1 -62.4 -64.3 63 -99 SPO 1997 04 03 15 26 112 3.6 -9 683.20 -64.2 -62.4 -64.4 62 -99 SPO 1997 04 03 15 27 116 3.5 -9 683.20 -64.4 -62.4 -64.4 63 -99 SPO 1997 04 03 15 28 121 3.4 -9 683.20 -64.4 -62.4 -64.4 63 -99 SPO 1997 04 03 15 29 116 3.6 -9 683.20 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 15 30 116 3.6 -9 683.20 -64.5 -62.4 -64.5 63 -99 SPO 1997 04 03 15 31 118 3.5 -9 683.20 -64.5 -62.5 -64.6 61 -99 SPO 1997 04 03 15 32 119 3.6 -9 683.20 -64.6 -62.5 -64.6 62 -99 SPO 1997 04 03 15 33 118 3.6 -9 683.20 -64.7 -62.5 -64.7 61 -99 SPO 1997 04 03 15 34 119 3.7 -9 683.20 -64.8 -62.5 -64.7 62 -99 SPO 1997 04 03 15 35 121 3.9 -9 683.20 -64.8 -62.6 -64.8 61 -99 SPO 1997 04 03 15 36 121 3.9 -9 683.20 -64.8 -62.6 -64.8 61 -99 SPO 1997 04 03 15 37 121 3.9 -9 683.20 -64.8 -62.6 -64.8 62 -99 SPO 1997 04 03 15 38 119 3.9 -9 683.20 -64.8 -62.6 -64.7 62 -99 SPO 1997 04 03 15 39 119 3.9 -9 683.20 -64.7 -62.6 -64.7 61 -99 SPO 1997 04 03 15 40 118 4.0 -9 683.20 -64.7 -62.6 -64.7 61 -99 SPO 1997 04 03 15 41 117 4.1 -9 683.20 -64.7 -62.6 -64.7 61 -99 SPO 1997 04 03 15 42 116 4.1 -9 683.20 -64.7 -62.6 -64.7 62 -99 SPO 1997 04 03 15 43 116 4.2 -9 683.20 -64.6 -62.6 -64.7 60 -99 SPO 1997 04 03 15 44 115 4.4 -9 683.20 -64.6 -62.6 -64.6 60 -99 SPO 1997 04 03 15 45 114 4.4 -9 683.20 -64.6 -62.7 -64.6 60 -99 SPO 1997 04 03 15 46 113 4.4 -9 683.20 -64.6 -62.7 -64.6 61 -99 SPO 1997 04 03 15 47 113 4.4 -9 683.20 -64.6 -62.7 -64.7 61 -99 SPO 1997 04 03 15 48 115 4.4 -9 683.30 -64.6 -62.8 -64.7 61 -99 SPO 1997 04 03 15 49 117 4.5 -9 683.30 -64.6 -62.8 -64.7 61 -99 SPO 1997 04 03 15 50 115 4.6 -9 683.30 -64.6 -62.9 -64.7 62 -99 SPO 1997 04 03 15 51 114 4.6 -9 683.30 -64.6 -62.9 -64.7 62 -99 SPO 1997 04 03 15 52 113 4.6 -9 683.20 -64.6 -62.9 -64.7 62 -99 SPO 1997 04 03 15 53 111 4.7 -9 683.20 -64.6 -62.8 -64.7 62 -99 SPO 1997 04 03 15 54 109 4.8 -9 683.20 -64.6 -62.8 -64.7 62 -99 SPO 1997 04 03 15 55 109 4.8 -9 683.20 -64.6 -62.7 -64.7 61 -99 SPO 1997 04 03 15 56 109 4.9 -9 683.20 -64.6 -62.7 -64.7 61 -99 SPO 1997 04 03 15 57 110 4.8 -9 683.20 -64.7 -62.8 -64.8 62 -99 SPO 1997 04 03 15 58 110 4.9 -9 683.20 -64.7 -62.8 -64.8 61 -99 SPO 1997 04 03 15 59 109 5.0 -9 683.20 -64.7 -62.8 -64.8 61 -99 SPO 1997 04 03 16 00 107 5.0 -9 683.20 -64.7 -62.8 -64.8 60 0 SPO 1997 04 03 16 01 107 5.0 -9 683.20 -64.7 -62.8 -64.8 61 -99 SPO 1997 04 03 16 02 106 4.8 -9 683.20 -64.8 -62.8 -64.8 62 -99 SPO 1997 04 03 16 03 107 4.6 -9 683.20 -64.8 -62.8 -64.8 62 -99 SPO 1997 04 03 16 04 109 4.3 -9 683.30 -64.8 -62.8 -64.9 62 -99 SPO 1997 04 03 16 05 114 4.1 -9 683.30 -64.8 -62.9 -64.9 62 -99 SPO 1997 04 03 16 06 114 4.2 -9 683.30 -64.8 -62.9 -64.9 62 -99 SPO 1997 04 03 16 07 113 4.5 -9 683.30 -64.8 -62.9 -64.8 62 -99 SPO 1997 04 03 16 08 111 4.7 -9 683.30 -64.7 -62.8 -64.8 61 -99 SPO 1997 04 03 16 09 111 4.7 -9 683.30 -64.7 -62.8 -64.8 62 -99 SPO 1997 04 03 16 10 111 4.8 -9 683.30 -64.7 -62.9 -64.8 62 -99 SPO 1997 04 03 16 11 110 4.8 -9 683.30 -64.7 -62.9 -64.8 62 -99 SPO 1997 04 03 16 12 109 5.1 -9 683.20 -64.6 -62.9 -64.7 61 -99 SPO 1997 04 03 16 13 108 5.2 -9 683.20 -64.6 -62.9 -64.7 61 -99 SPO 1997 04 03 16 14 107 5.2 -9 683.20 -64.6 -62.9 -64.7 61 -99 SPO 1997 04 03 16 15 106 5.2 -9 683.20 -64.6 -62.9 -64.7 61 -99 SPO 1997 04 03 16 16 106 5.3 -9 683.20 -64.6 -62.9 -64.7 63 -99 SPO 1997 04 03 16 17 105 5.4 -9 683.20 -64.6 -62.8 -64.7 63 -99 SPO 1997 04 03 16 18 105 5.5 -9 683.20 -64.6 -62.8 -64.7 63 -99 SPO 1997 04 03 16 19 104 5.6 -9 683.20 -64.6 -62.8 -64.7 62 -99 SPO 1997 04 03 16 20 104 5.6 -9 683.20 -64.6 -62.7 -64.7 63 -99 SPO 1997 04 03 16 21 104 5.8 -9 683.20 -64.5 -62.7 -64.6 63 -99 SPO 1997 04 03 16 22 104 5.8 -9 683.20 -64.5 -62.7 -64.6 63 -99 SPO 1997 04 03 16 23 103 6.0 -9 683.20 -64.5 -62.6 -64.6 63 -99 SPO 1997 04 03 16 24 101 6.0 -9 683.10 -64.5 -62.5 -64.6 63 -99 SPO 1997 04 03 16 25 99 6.1 -9 683.10 -64.5 -62.5 -64.6 63 -99 SPO 1997 04 03 16 26 98 6.3 -9 683.10 -64.4 -62.5 -64.5 63 -99 SPO 1997 04 03 16 27 98 6.3 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 28 97 6.3 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 29 96 6.4 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 30 96 6.4 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 31 95 6.5 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 32 95 6.4 -9 683.10 -64.4 -62.4 -64.6 62 -99 SPO 1997 04 03 16 33 94 6.4 -9 683.10 -64.4 -62.3 -64.5 60 -99 SPO 1997 04 03 16 34 94 6.4 -9 683.10 -64.4 -62.3 -64.5 60 -99 SPO 1997 04 03 16 35 94 6.2 -9 683.10 -64.4 -62.3 -64.6 60 -99 SPO 1997 04 03 16 36 95 6.2 -9 683.10 -64.4 -62.3 -64.6 60 -99 SPO 1997 04 03 16 37 95 6.2 -9 683.10 -64.4 -62.3 -64.5 62 -99 SPO 1997 04 03 16 38 94 6.1 -9 683.10 -64.4 -62.3 -64.5 63 -99 SPO 1997 04 03 16 39 94 6.1 -9 683.10 -64.4 -62.3 -64.5 63 -99 SPO 1997 04 03 16 40 95 6.0 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 41 94 5.9 -9 683.10 -64.4 -62.4 -64.5 63 -99 SPO 1997 04 03 16 42 95 5.9 -9 683.20 -64.4 -62.5 -64.5 63 -99 SPO 1997 04 03 16 43 96 5.8 -9 683.20 -64.4 -62.5 -64.6 60 -99 SPO 1997 04 03 16 44 96 5.8 -9 683.20 -64.4 -62.6 -64.6 60 -99 SPO 1997 04 03 16 45 95 5.9 -9 683.20 -64.5 -62.6 -64.6 61 -99 SPO 1997 04 03 16 46 95 5.9 -9 683.20 -64.5 -62.6 -64.6 60 -99 SPO 1997 04 03 16 47 94 5.9 -9 683.20 -64.5 -62.7 -64.6 60 -99 SPO 1997 04 03 16 48 93 6.0 -9 683.20 -64.5 -62.6 -64.6 60 -99 SPO 1997 04 03 16 49 93 6.1 -9 683.10 -64.5 -62.6 -64.6 61 -99 SPO 1997 04 03 16 50 93 6.0 -9 683.10 -64.5 -62.5 -64.6 61 -99 SPO 1997 04 03 16 51 92 6.0 -9 683.20 -64.5 -62.5 -64.6 63 -99 SPO 1997 04 03 16 52 92 6.0 -9 683.20 -64.5 -62.5 -64.6 61 -99 SPO 1997 04 03 16 53 91 6.1 -9 683.20 -64.5 -62.5 -64.6 61 -99 SPO 1997 04 03 16 54 92 6.1 -9 683.20 -64.5 -62.5 -64.6 61 -99 SPO 1997 04 03 16 55 92 6.2 -9 683.20 -64.5 -62.5 -64.6 60 -99 SPO 1997 04 03 16 56 91 6.2 -9 683.20 -64.4 -62.5 -64.6 59 -99 SPO 1997 04 03 16 57 91 6.2 -9 683.20 -64.4 -62.5 -64.5 59 -99 SPO 1997 04 03 16 58 91 6.2 -9 683.20 -64.4 -62.5 -64.5 59 -99 SPO 1997 04 03 16 59 91 6.2 -9 683.20 -64.4 -62.6 -64.5 59 -99 SPO 1997 04 03 17 00 91 6.2 -9 683.20 -64.4 -62.6 -64.5 60 0 SPO 1997 04 03 17 01 91 6.0 -9 683.20 -64.4 -62.6 -64.5 62 -99 SPO 1997 04 03 17 02 91 5.8 -9 683.20 -64.4 -62.7 -64.5 63 -99 SPO 1997 04 03 17 03 91 5.8 -9 683.20 -64.4 -62.7 -64.5 63 -99 SPO 1997 04 03 17 04 91 5.8 -9 683.20 -64.4 -62.7 -64.5 63 -99 SPO 1997 04 03 17 05 90 5.9 -9 683.20 -64.4 -62.7 -64.5 63 -99 SPO 1997 04 03 17 06 90 5.9 -9 683.20 -64.3 -62.7 -64.5 62 -99 SPO 1997 04 03 17 07 90 6.0 -9 683.20 -64.3 -62.6 -64.5 62 -99 SPO 1997 04 03 17 08 90 6.0 -9 683.20 -64.3 -62.6 -64.5 62 -99 SPO 1997 04 03 17 09 90 5.9 -9 683.20 -64.3 -62.6 -64.4 61 -99 SPO 1997 04 03 17 10 90 6.0 -9 683.20 -64.3 -62.5 -64.4 61 -99 SPO 1997 04 03 17 11 90 6.0 -9 683.20 -64.3 -62.5 -64.4 61 -99 SPO 1997 04 03 17 12 91 6.0 -9 683.20 -64.3 -62.5 -64.4 59 -99 SPO 1997 04 03 17 13 91 5.9 -9 683.20 -64.3 -62.6 -64.4 62 -99 SPO 1997 04 03 17 14 93 5.9 -9 683.20 -64.3 -62.7 -64.4 63 -99 SPO 1997 04 03 17 15 94 5.8 -9 683.20 -64.3 -62.8 -64.4 63 -99 SPO 1997 04 03 17 16 95 5.8 -9 683.20 -64.3 -62.8 -64.4 62 -99 SPO 1997 04 03 17 17 95 5.8 -9 683.20 -64.3 -62.9 -64.4 62 -99 SPO 1997 04 03 17 18 95 5.8 -9 683.20 -64.4 -62.9 -64.5 62 -99 SPO 1997 04 03 17 19 95 5.9 -9 683.20 -64.4 -63.0 -64.5 62 -99 SPO 1997 04 03 17 20 95 6.1 -9 683.20 -64.3 -63.0 -64.4 61 -99 SPO 1997 04 03 17 21 94 6.1 -9 683.20 -64.3 -62.9 -64.4 61 -99 SPO 1997 04 03 17 22 94 6.1 -9 683.20 -64.3 -62.7 -64.4 61 -99 SPO 1997 04 03 17 23 95 6.1 -9 683.20 -64.3 -62.7 -64.4 61 -99 SPO 1997 04 03 17 24 95 6.1 -9 683.20 -64.3 -62.6 -64.4 61 -99 SPO 1997 04 03 17 25 94 6.2 -9 683.20 -64.3 -62.5 -64.4 62 -99 SPO 1997 04 03 17 26 95 6.0 -9 683.20 -64.3 -62.5 -64.4 62 -99 SPO 1997 04 03 17 27 96 5.9 -9 683.20 -64.3 -62.5 -64.4 62 -99 SPO 1997 04 03 17 28 96 5.9 -9 683.20 -64.3 -62.6 -64.5 61 -99 SPO 1997 04 03 17 29 97 5.7 -9 683.20 -64.4 -62.6 -64.5 62 -99 SPO 1997 04 03 17 30 98 5.5 -9 683.30 -64.4 -62.5 -64.5 62 -99 SPO 1997 04 03 17 31 99 5.5 -9 683.30 -64.4 -62.5 -64.5 62 -99 SPO 1997 04 03 17 32 100 5.5 -9 683.30 -64.4 -62.6 -64.6 60 -99 SPO 1997 04 03 17 33 101 5.4 -9 683.30 -64.5 -62.7 -64.6 60 -99 SPO 1997 04 03 17 34 100 5.4 -9 683.30 -64.5 -62.7 -64.6 60 -99 SPO 1997 04 03 17 35 100 5.6 -9 683.30 -64.5 -62.8 -64.6 59 -99 SPO 1997 04 03 17 36 100 5.6 -9 683.30 -64.5 -62.8 -64.6 59 -99 SPO 1997 04 03 17 37 98 5.8 -9 683.30 -64.5 -62.8 -64.6 59 -99 SPO 1997 04 03 17 38 97 5.8 -9 683.30 -64.5 -62.8 -64.6 60 -99 SPO 1997 04 03 17 39 96 6.0 -9 683.30 -64.5 -62.8 -64.6 61 -99 SPO 1997 04 03 17 40 95 5.9 -9 683.30 -64.5 -62.8 -64.6 61 -99 SPO 1997 04 03 17 41 95 5.9 -9 683.30 -64.5 -62.7 -64.6 61 -99 SPO 1997 04 03 17 42 96 5.8 -9 683.30 -64.5 -62.7 -64.6 60 -99 SPO 1997 04 03 17 43 96 5.6 -9 683.30 -64.5 -62.8 -64.6 59 -99 SPO 1997 04 03 17 44 98 5.6 -9 683.30 -64.5 -62.8 -64.6 59 -99 SPO 1997 04 03 17 45 99 5.4 -9 683.40 -64.5 -62.9 -64.6 59 -99 SPO 1997 04 03 17 46 100 5.4 -9 683.40 -64.5 -63.0 -64.6 59 -99 SPO 1997 04 03 17 47 98 5.5 -9 683.40 -64.5 -63.0 -64.6 59 -99 SPO 1997 04 03 17 48 97 5.5 -9 683.40 -64.5 -63.1 -64.6 59 -99 SPO 1997 04 03 17 49 97 5.6 -9 683.40 -64.5 -63.1 -64.6 59 -99 SPO 1997 04 03 17 50 97 5.5 -9 683.40 -64.5 -63.0 -64.6 59 -99 SPO 1997 04 03 17 51 98 5.4 -9 683.40 -64.5 -63.1 -64.6 60 -99 SPO 1997 04 03 17 52 98 5.5 -9 683.40 -64.6 -63.2 -64.7 61 -99 SPO 1997 04 03 17 53 97 5.5 -9 683.50 -64.6 -63.2 -64.7 61 -99 SPO 1997 04 03 17 54 96 5.6 -9 683.40 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 17 55 96 5.7 -9 683.40 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 17 56 96 5.7 -9 683.50 -64.6 -63.1 -64.7 59 -99 SPO 1997 04 03 17 57 95 5.9 -9 683.40 -64.6 -63.2 -64.7 59 -99 SPO 1997 04 03 17 58 95 6.0 -9 683.40 -64.6 -63.2 -64.7 59 -99 SPO 1997 04 03 17 59 96 6.0 -9 683.40 -64.6 -63.2 -64.7 59 -99 SPO 1997 04 03 18 00 98 5.7 -9 683.50 -64.6 -63.2 -64.6 59 0 SPO 1997 04 03 18 01 100 5.5 -9 683.50 -64.6 -63.2 -64.6 60 -99 SPO 1997 04 03 18 02 100 5.6 -9 683.50 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 18 03 98 5.7 -9 683.50 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 18 04 97 5.9 -9 683.40 -64.5 -63.2 -64.6 59 -99 SPO 1997 04 03 18 05 97 5.9 -9 683.40 -64.5 -63.2 -64.6 59 -99 SPO 1997 04 03 18 06 98 5.9 -9 683.50 -64.5 -63.2 -64.6 59 -99 SPO 1997 04 03 18 07 99 5.8 -9 683.50 -64.5 -63.3 -64.6 59 -99 SPO 1997 04 03 18 08 99 5.8 -9 683.50 -64.5 -63.3 -64.7 59 -99 SPO 1997 04 03 18 09 99 5.9 -9 683.50 -64.6 -63.3 -64.7 59 -99 SPO 1997 04 03 18 10 99 6.0 -9 683.50 -64.6 -63.2 -64.7 59 -99 SPO 1997 04 03 18 11 99 6.0 -9 683.50 -64.6 -63.3 -64.7 58 -99 SPO 1997 04 03 18 12 98 6.1 -9 683.50 -64.6 -63.4 -64.7 59 -99 SPO 1997 04 03 18 13 96 6.1 -9 683.50 -64.6 -63.3 -64.7 59 -99 SPO 1997 04 03 18 14 96 6.0 -9 683.50 -64.6 -63.3 -64.7 60 -99 SPO 1997 04 03 18 15 96 6.0 -9 683.50 -64.6 -63.4 -64.7 60 -99 SPO 1997 04 03 18 16 97 6.0 -9 683.50 -64.6 -63.4 -64.7 60 -99 SPO 1997 04 03 18 17 97 5.9 -9 683.50 -64.6 -63.3 -64.7 61 -99 SPO 1997 04 03 18 18 97 5.9 -9 683.50 -64.6 -63.3 -64.7 61 -99 SPO 1997 04 03 18 19 96 6.0 -9 683.50 -64.6 -63.3 -64.7 60 -99 SPO 1997 04 03 18 20 95 5.9 -9 683.50 -64.6 -63.3 -64.7 60 -99 SPO 1997 04 03 18 21 96 5.7 -9 683.50 -64.6 -63.3 -64.7 60 -99 SPO 1997 04 03 18 22 97 5.8 -9 683.60 -64.6 -63.3 -64.7 60 -99 SPO 1997 04 03 18 23 97 5.9 -9 683.50 -64.6 -63.3 -64.7 60 -99 SPO 1997 04 03 18 24 96 5.9 -9 683.50 -64.6 -63.4 -64.7 58 -99 SPO 1997 04 03 18 25 96 6.1 -9 683.50 -64.6 -63.4 -64.7 58 -99 SPO 1997 04 03 18 26 96 6.1 -9 683.50 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 18 27 94 6.2 -9 683.50 -64.6 -63.5 -64.6 60 -99 SPO 1997 04 03 18 28 94 6.2 -9 683.50 -64.6 -63.5 -64.6 61 -99 SPO 1997 04 03 18 29 94 6.2 -9 683.50 -64.5 -63.5 -64.6 60 -99 SPO 1997 04 03 18 30 95 6.1 -9 683.50 -64.5 -63.6 -64.6 60 -99 SPO 1997 04 03 18 31 94 6.3 -9 683.50 -64.5 -63.5 -64.6 60 -99 SPO 1997 04 03 18 32 93 6.4 -9 683.50 -64.5 -63.5 -64.6 59 -99 SPO 1997 04 03 18 33 94 6.3 -9 683.50 -64.5 -63.5 -64.6 59 -99 SPO 1997 04 03 18 34 94 6.0 -9 683.50 -64.5 -63.5 -64.6 59 -99 SPO 1997 04 03 18 35 94 6.2 -9 683.60 -64.5 -63.5 -64.6 59 -99 SPO 1997 04 03 18 36 93 6.3 -9 683.60 -64.5 -63.6 -64.6 59 -99 SPO 1997 04 03 18 37 92 6.4 -9 683.60 -64.5 -63.6 -64.6 59 -99 SPO 1997 04 03 18 38 92 6.4 -9 683.50 -64.5 -63.5 -64.6 60 -99 SPO 1997 04 03 18 39 91 6.5 -9 683.50 -64.5 -63.5 -64.6 60 -99 SPO 1997 04 03 18 40 91 6.5 -9 683.50 -64.5 -63.5 -64.6 60 -99 SPO 1997 04 03 18 41 92 6.4 -9 683.50 -64.5 -63.5 -64.6 59 -99 SPO 1997 04 03 18 42 93 6.2 -9 683.50 -64.5 -63.5 -64.6 59 -99 SPO 1997 04 03 18 43 94 6.2 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 18 44 96 6.1 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 18 45 97 6.0 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 18 46 98 5.9 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 18 47 97 6.0 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 18 48 96 6.0 -9 683.60 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 18 49 95 6.1 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 18 50 95 6.2 -9 683.60 -64.6 -63.4 -64.7 60 -99 SPO 1997 04 03 18 51 93 6.3 -9 683.60 -64.6 -63.4 -64.7 60 -99 SPO 1997 04 03 18 52 93 6.3 -9 683.60 -64.6 -63.4 -64.7 60 -99 SPO 1997 04 03 18 53 93 6.3 -9 683.60 -64.6 -63.4 -64.7 60 -99 SPO 1997 04 03 18 54 93 6.3 -9 683.60 -64.6 -63.4 -64.7 59 -99 SPO 1997 04 03 18 55 92 6.3 -9 683.60 -64.6 -63.4 -64.7 59 -99 SPO 1997 04 03 18 56 91 6.2 -9 683.60 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 18 57 91 6.2 -9 683.60 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 18 58 91 6.2 -9 683.60 -64.6 -63.6 -64.7 59 -99 SPO 1997 04 03 18 59 91 6.2 -9 683.60 -64.6 -63.6 -64.7 58 -99 SPO 1997 04 03 19 00 91 6.1 -9 683.60 -64.6 -63.5 -64.7 59 0 SPO 1997 04 03 19 01 90 6.1 -9 683.60 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 19 02 90 6.1 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 19 03 91 6.0 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 19 04 91 6.0 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 19 05 92 5.9 -9 683.60 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 19 06 93 5.9 -9 683.60 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 19 07 95 5.9 -9 683.60 -64.6 -63.6 -64.8 59 -99 SPO 1997 04 03 19 08 94 5.8 -9 683.60 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 19 09 94 5.8 -9 683.60 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 19 10 94 5.8 -9 683.60 -64.7 -63.7 -64.8 58 -99 SPO 1997 04 03 19 11 94 6.0 -9 683.60 -64.7 -63.7 -64.8 58 -99 SPO 1997 04 03 19 12 93 6.0 -9 683.60 -64.7 -63.7 -64.8 58 -99 SPO 1997 04 03 19 13 93 6.1 -9 683.60 -64.8 -63.7 -64.8 58 -99 SPO 1997 04 03 19 14 92 6.2 -9 683.60 -64.8 -63.6 -64.8 58 -99 SPO 1997 04 03 19 15 92 6.1 -9 683.60 -64.7 -63.5 -64.8 62 -99 SPO 1997 04 03 19 16 92 6.1 -9 683.60 -64.7 -63.5 -64.9 58 -99 SPO 1997 04 03 19 17 94 6.1 -9 683.60 -64.8 -63.6 -64.9 58 -99 SPO 1997 04 03 19 18 94 5.9 -9 683.60 -64.8 -63.5 -64.9 58 -99 SPO 1997 04 03 19 19 94 5.8 -9 683.60 -64.8 -63.5 -64.9 58 -99 SPO 1997 04 03 19 20 95 5.8 -9 683.60 -64.8 -63.5 -64.9 58 -99 SPO 1997 04 03 19 21 95 5.8 -9 683.60 -64.8 -63.5 -64.9 58 -99 SPO 1997 04 03 19 22 95 5.7 -9 683.60 -64.8 -63.4 -64.9 58 -99 SPO 1997 04 03 19 23 95 5.8 -9 683.60 -64.8 -63.4 -65.0 57 -99 SPO 1997 04 03 19 24 95 5.8 -9 683.60 -64.9 -63.4 -65.0 58 -99 SPO 1997 04 03 19 25 95 5.7 -9 683.60 -64.9 -63.4 -64.9 59 -99 SPO 1997 04 03 19 26 96 5.6 -9 683.60 -64.9 -63.4 -65.0 59 -99 SPO 1997 04 03 19 27 97 5.6 -9 683.60 -64.9 -63.4 -64.9 59 -99 SPO 1997 04 03 19 28 99 5.5 -9 683.70 -64.8 -63.4 -64.9 58 -99 SPO 1997 04 03 19 29 99 5.4 -9 683.70 -64.8 -63.4 -64.9 58 -99 SPO 1997 04 03 19 30 100 5.4 -9 683.70 -64.8 -63.4 -64.9 58 -99 SPO 1997 04 03 19 31 100 5.4 -9 683.70 -64.8 -63.3 -64.9 58 -99 SPO 1997 04 03 19 32 99 5.5 -9 683.70 -64.7 -63.3 -64.9 58 -99 SPO 1997 04 03 19 33 99 5.4 -9 683.70 -64.7 -63.2 -64.9 58 -99 SPO 1997 04 03 19 34 98 5.5 -9 683.70 -64.7 -63.2 -64.8 58 -99 SPO 1997 04 03 19 35 98 5.5 -9 683.70 -64.7 -63.1 -64.8 57 -99 SPO 1997 04 03 19 36 98 5.4 -9 683.70 -64.6 -63.1 -64.7 56 -99 SPO 1997 04 03 19 37 98 5.5 -9 683.70 -64.6 -63.0 -64.7 57 -99 SPO 1997 04 03 19 38 97 5.6 -9 683.70 -64.6 -63.0 -64.7 57 -99 SPO 1997 04 03 19 39 97 5.7 -9 683.70 -64.5 -63.1 -64.6 59 -99 SPO 1997 04 03 19 40 98 5.6 -9 683.70 -64.5 -63.1 -64.6 59 -99 SPO 1997 04 03 19 41 99 5.7 -9 683.70 -64.5 -63.1 -64.6 59 -99 SPO 1997 04 03 19 42 98 5.9 -9 683.70 -64.5 -63.1 -64.6 59 -99 SPO 1997 04 03 19 43 98 5.9 -9 683.70 -64.5 -63.1 -64.6 60 -99 SPO 1997 04 03 19 44 98 5.9 -9 683.70 -64.4 -63.1 -64.6 59 -99 SPO 1997 04 03 19 45 98 5.9 -9 683.70 -64.4 -63.1 -64.6 59 -99 SPO 1997 04 03 19 46 99 5.9 -9 683.70 -64.4 -63.0 -64.5 59 -99 SPO 1997 04 03 19 47 99 6.0 -9 683.70 -64.4 -63.0 -64.5 59 -99 SPO 1997 04 03 19 48 99 6.0 -9 683.70 -64.4 -63.0 -64.5 59 -99 SPO 1997 04 03 19 49 98 6.0 -9 683.70 -64.4 -63.0 -64.5 60 -99 SPO 1997 04 03 19 50 98 6.0 -9 683.70 -64.4 -63.0 -64.5 60 -99 SPO 1997 04 03 19 51 98 6.0 -9 683.70 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 19 52 98 6.2 -9 683.70 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 19 53 98 6.3 -9 683.70 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 19 54 99 6.5 -9 683.60 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 19 55 99 6.4 -9 683.60 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 19 56 98 6.4 -9 683.60 -64.4 -62.8 -64.5 59 -99 SPO 1997 04 03 19 57 98 6.4 -9 683.70 -64.4 -62.8 -64.5 59 -99 SPO 1997 04 03 19 58 99 6.2 -9 683.70 -64.4 -62.8 -64.5 59 -99 SPO 1997 04 03 19 59 102 6.1 -9 683.80 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 20 00 104 6.0 -9 683.80 -64.4 -62.9 -64.5 59 0 SPO 1997 04 03 20 01 105 5.7 -9 683.80 -64.4 -62.9 -64.5 59 -99 SPO 1997 04 03 20 02 105 5.6 -9 683.80 -64.4 -63.0 -64.5 59 -99 SPO 1997 04 03 20 03 106 5.4 -9 683.80 -64.4 -63.1 -64.5 59 -99 SPO 1997 04 03 20 04 110 5.1 -9 683.90 -64.4 -63.1 -64.6 59 -99 SPO 1997 04 03 20 05 116 4.8 -9 683.90 -64.5 -63.2 -64.6 59 -99 SPO 1997 04 03 20 06 118 4.9 -9 683.90 -64.6 -63.4 -64.7 59 -99 SPO 1997 04 03 20 07 115 5.2 -9 683.90 -64.6 -63.5 -64.8 58 -99 SPO 1997 04 03 20 08 113 5.4 -9 683.90 -64.7 -63.6 -64.9 58 -99 SPO 1997 04 03 20 09 113 5.4 -9 683.90 -64.8 -63.6 -64.9 58 -99 SPO 1997 04 03 20 10 113 5.3 -9 683.90 -64.8 -63.6 -64.9 58 -99 SPO 1997 04 03 20 11 113 5.1 -9 683.90 -64.9 -63.6 -64.9 58 -99 SPO 1997 04 03 20 12 112 5.1 -9 683.90 -64.9 -63.5 -65.0 58 -99 SPO 1997 04 03 20 13 112 5.0 -9 683.90 -64.9 -63.5 -65.0 58 -99 SPO 1997 04 03 20 14 112 5.1 -9 683.90 -64.9 -63.5 -65.0 58 -99 SPO 1997 04 03 20 15 112 5.1 -9 683.90 -64.9 -63.4 -65.0 58 -99 SPO 1997 04 03 20 16 112 5.3 -9 683.90 -64.9 -63.4 -65.0 58 -99 SPO 1997 04 03 20 17 112 5.3 -9 683.90 -64.9 -63.3 -65.0 58 -99 SPO 1997 04 03 20 18 113 5.2 -9 683.90 -64.9 -63.4 -65.0 58 -99 SPO 1997 04 03 20 19 114 5.2 -9 683.90 -64.9 -63.4 -65.0 56 -99 SPO 1997 04 03 20 20 112 5.3 -9 683.90 -64.9 -63.4 -65.0 56 -99 SPO 1997 04 03 20 21 111 5.2 -9 683.90 -64.9 -63.4 -65.0 56 -99 SPO 1997 04 03 20 22 111 5.1 -9 683.90 -64.9 -63.4 -65.0 56 -99 SPO 1997 04 03 20 23 111 5.0 -9 683.90 -64.9 -63.5 -65.0 56 -99 SPO 1997 04 03 20 24 111 5.3 -9 683.90 -64.9 -63.6 -65.0 56 -99 SPO 1997 04 03 20 25 111 5.4 -9 683.90 -64.9 -63.6 -65.0 56 -99 SPO 1997 04 03 20 26 110 5.7 -9 683.90 -65.0 -63.6 -65.0 58 -99 SPO 1997 04 03 20 27 110 5.9 -9 683.90 -65.0 -63.5 -65.1 59 -99 SPO 1997 04 03 20 28 110 5.9 -9 683.90 -65.0 -63.4 -65.1 59 -99 SPO 1997 04 03 20 29 109 6.0 -9 683.90 -65.0 -63.4 -65.1 58 -99 SPO 1997 04 03 20 30 110 6.0 -9 683.80 -65.0 -63.2 -65.1 58 -99 SPO 1997 04 03 20 31 110 6.0 -9 683.80 -65.0 -63.1 -65.1 57 -99 SPO 1997 04 03 20 32 109 6.1 -9 683.80 -65.1 -63.1 -65.2 58 -99 SPO 1997 04 03 20 33 108 6.0 -9 683.80 -65.1 -63.0 -65.2 58 -99 SPO 1997 04 03 20 34 109 5.9 -9 683.90 -65.1 -63.0 -65.2 57 -99 SPO 1997 04 03 20 35 110 5.7 -9 683.90 -65.0 -63.0 -65.1 56 -99 SPO 1997 04 03 20 36 111 5.6 -9 683.90 -65.0 -63.1 -65.1 57 -99 SPO 1997 04 03 20 37 111 5.6 -9 683.90 -65.0 -63.2 -65.1 58 -99 SPO 1997 04 03 20 38 111 5.6 -9 683.90 -65.0 -63.2 -65.1 58 -99 SPO 1997 04 03 20 39 111 5.7 -9 683.90 -65.0 -63.3 -65.1 59 -99 SPO 1997 04 03 20 40 111 5.8 -9 683.90 -65.0 -63.3 -65.1 58 -99 SPO 1997 04 03 20 41 110 5.8 -9 683.90 -65.0 -63.3 -65.1 58 -99 SPO 1997 04 03 20 42 108 5.9 -9 683.90 -65.0 -63.3 -65.1 58 -99 SPO 1997 04 03 20 43 108 5.9 -9 683.90 -65.0 -63.2 -65.1 58 -99 SPO 1997 04 03 20 44 108 6.0 -9 683.90 -65.0 -63.2 -65.1 58 -99 SPO 1997 04 03 20 45 108 6.0 -9 683.90 -64.9 -63.2 -65.1 58 -99 SPO 1997 04 03 20 46 107 6.1 -9 683.90 -64.9 -63.1 -65.0 58 -99 SPO 1997 04 03 20 47 106 6.2 -9 683.90 -64.9 -63.0 -65.0 58 -99 SPO 1997 04 03 20 48 105 6.2 -9 683.90 -64.9 -63.0 -65.0 58 -99 SPO 1997 04 03 20 49 104 6.2 -9 683.90 -64.9 -63.0 -65.0 58 -99 SPO 1997 04 03 20 50 104 6.3 -9 683.90 -64.9 -63.1 -65.0 58 -99 SPO 1997 04 03 20 51 104 6.5 -9 683.80 -64.9 -63.1 -65.0 58 -99 SPO 1997 04 03 20 52 105 6.4 -9 683.90 -64.9 -63.1 -65.0 59 -99 SPO 1997 04 03 20 53 104 6.3 -9 683.90 -64.8 -63.1 -64.9 58 -99 SPO 1997 04 03 20 54 104 6.3 -9 683.90 -64.8 -63.1 -64.9 58 -99 SPO 1997 04 03 20 55 104 6.3 -9 683.90 -64.8 -63.0 -64.9 58 -99 SPO 1997 04 03 20 56 104 6.3 -9 683.90 -64.7 -63.0 -64.9 58 -99 SPO 1997 04 03 20 57 105 6.3 -9 683.90 -64.7 -63.0 -64.9 58 -99 SPO 1997 04 03 20 58 105 6.6 -9 683.90 -64.7 -62.8 -64.9 60 -99 SPO 1997 04 03 20 59 105 6.6 -9 683.90 -64.7 -62.7 -64.9 60 -99 SPO 1997 04 03 21 00 104 6.6 -9 683.90 -64.7 -62.7 -64.8 58 0 SPO 1997 04 03 21 01 104 6.5 -9 683.90 -64.7 -62.7 -64.8 60 -99 SPO 1997 04 03 21 02 104 6.5 -9 683.90 -64.6 -62.7 -64.7 59 -99 SPO 1997 04 03 21 03 104 6.4 -9 683.90 -64.6 -62.7 -64.7 59 -99 SPO 1997 04 03 21 04 105 6.3 -9 683.90 -64.6 -62.8 -64.7 60 -99 SPO 1997 04 03 21 05 104 6.4 -9 683.90 -64.6 -62.8 -64.7 60 -99 SPO 1997 04 03 21 06 103 6.3 -9 683.90 -64.6 -62.9 -64.7 60 -99 SPO 1997 04 03 21 07 103 6.3 -9 683.90 -64.6 -62.8 -64.7 59 -99 SPO 1997 04 03 21 08 102 6.1 -9 683.90 -64.6 -62.9 -64.7 59 -99 SPO 1997 04 03 21 09 101 6.1 -9 683.90 -64.6 -62.9 -64.7 59 -99 SPO 1997 04 03 21 10 102 6.1 -9 683.90 -64.5 -63.0 -64.7 59 -99 SPO 1997 04 03 21 11 100 6.1 -9 683.90 -64.5 -63.0 -64.7 59 -99 SPO 1997 04 03 21 12 100 6.2 -9 683.90 -64.5 -62.9 -64.7 59 -99 SPO 1997 04 03 21 13 100 6.2 -9 683.90 -64.5 -62.8 -64.7 59 -99 SPO 1997 04 03 21 14 99 6.3 -9 683.90 -64.6 -62.9 -64.7 60 -99 SPO 1997 04 03 21 15 99 6.2 -9 683.90 -64.5 -62.8 -64.7 59 -99 SPO 1997 04 03 21 16 99 6.2 -9 683.90 -64.6 -62.8 -64.7 60 -99 SPO 1997 04 03 21 17 99 6.0 -9 683.90 -64.6 -62.8 -64.7 59 -99 SPO 1997 04 03 21 18 99 6.0 -9 683.90 -64.5 -62.9 -64.7 59 -99 SPO 1997 04 03 21 19 100 5.9 -9 684.00 -64.5 -63.0 -64.7 57 -99 SPO 1997 04 03 21 20 101 5.9 -9 684.00 -64.6 -63.1 -64.7 59 -99 SPO 1997 04 03 21 21 102 6.0 -9 684.00 -64.6 -63.2 -64.7 58 -99 SPO 1997 04 03 21 22 102 6.1 -9 684.00 -64.6 -63.2 -64.7 58 -99 SPO 1997 04 03 21 23 101 6.0 -9 684.00 -64.6 -63.2 -64.7 59 -99 SPO 1997 04 03 21 24 101 6.0 -9 684.00 -64.6 -63.2 -64.7 59 -99 SPO 1997 04 03 21 25 101 5.9 -9 684.00 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 21 26 102 6.1 -9 684.00 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 21 27 102 6.2 -9 684.00 -64.6 -63.2 -64.7 60 -99 SPO 1997 04 03 21 28 102 6.3 -9 684.00 -64.5 -63.3 -64.6 59 -99 SPO 1997 04 03 21 29 102 6.3 -9 684.00 -64.6 -63.3 -64.7 59 -99 SPO 1997 04 03 21 30 102 6.3 -9 684.00 -64.6 -63.3 -64.7 59 -99 SPO 1997 04 03 21 31 103 6.3 -9 684.00 -64.6 -63.3 -64.7 59 -99 SPO 1997 04 03 21 32 104 6.3 -9 684.00 -64.6 -63.3 -64.7 59 -99 SPO 1997 04 03 21 33 103 6.2 -9 684.10 -64.6 -63.4 -64.7 59 -99 SPO 1997 04 03 21 34 103 6.2 -9 684.10 -64.6 -63.5 -64.7 59 -99 SPO 1997 04 03 21 35 104 6.1 -9 684.10 -64.6 -63.5 -64.7 60 -99 SPO 1997 04 03 21 36 103 6.1 -9 684.10 -64.6 -63.5 -64.8 60 -99 SPO 1997 04 03 21 37 103 6.1 -9 684.10 -64.7 -63.5 -64.8 61 -99 SPO 1997 04 03 21 38 104 6.1 -9 684.10 -64.7 -63.5 -64.8 61 -99 SPO 1997 04 03 21 39 105 5.9 -9 684.20 -64.7 -63.5 -64.8 61 -99 SPO 1997 04 03 21 40 107 5.9 -9 684.20 -64.7 -63.5 -64.8 61 -99 SPO 1997 04 03 21 41 107 5.9 -9 684.20 -64.7 -63.5 -64.8 60 -99 SPO 1997 04 03 21 42 105 5.9 -9 684.20 -64.7 -63.5 -64.9 58 -99 SPO 1997 04 03 21 43 104 6.1 -9 684.20 -64.7 -63.5 -64.8 58 -99 SPO 1997 04 03 21 44 104 6.1 -9 684.20 -64.7 -63.4 -64.8 57 -99 SPO 1997 04 03 21 45 104 6.0 -9 684.20 -64.7 -63.4 -64.8 57 -99 SPO 1997 04 03 21 46 104 5.9 -9 684.20 -64.7 -63.5 -64.8 57 -99 SPO 1997 04 03 21 47 105 5.8 -9 684.30 -64.7 -63.6 -64.8 57 -99 SPO 1997 04 03 21 48 105 5.9 -9 684.30 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 21 49 104 5.9 -9 684.30 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 21 50 103 5.9 -9 684.30 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 21 51 102 6.0 -9 684.30 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 21 52 102 6.0 -9 684.30 -64.7 -63.7 -64.8 58 -99 SPO 1997 04 03 21 53 102 6.1 -9 684.20 -64.7 -63.7 -64.8 58 -99 SPO 1997 04 03 21 54 102 6.2 -9 684.20 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 21 55 101 6.2 -9 684.30 -64.7 -63.7 -64.8 60 -99 SPO 1997 04 03 21 56 100 6.1 -9 684.30 -64.6 -63.7 -64.7 57 -99 SPO 1997 04 03 21 57 99 6.2 -9 684.30 -64.6 -63.6 -64.8 -99 -99 SPO 1997 04 03 21 58 98 6.3 -9 684.20 -64.6 -63.6 -64.8 -99 -99 SPO 1997 04 03 21 59 97 6.4 -9 684.20 -64.6 -63.6 -64.8 -99 -99 SPO 1997 04 03 22 00 97 6.3 -9 684.20 -64.6 -63.5 -64.8 -99 0 SPO 1997 04 03 22 01 96 6.5 -9 684.20 -64.6 -63.5 -64.8 -99 -99 SPO 1997 04 03 22 02 96 6.4 -9 684.20 -64.6 -63.6 -64.7 59 -99 SPO 1997 04 03 22 03 96 6.2 -9 684.20 -64.6 -63.6 -64.7 60 -99 SPO 1997 04 03 22 04 94 6.2 -9 684.20 -64.6 -63.6 -64.7 60 -99 SPO 1997 04 03 22 05 93 6.0 -9 684.20 -64.6 -63.6 -64.8 59 -99 SPO 1997 04 03 22 06 92 5.7 -9 684.20 -64.7 -63.6 -64.8 60 -99 SPO 1997 04 03 22 07 92 5.5 -9 684.30 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 22 08 94 5.3 -9 684.30 -64.7 -63.6 -64.8 58 -99 SPO 1997 04 03 22 09 95 5.3 -9 684.30 -64.7 -63.7 -64.9 57 -99 SPO 1997 04 03 22 10 96 5.2 -9 684.30 -64.8 -63.7 -64.9 58 -99 SPO 1997 04 03 22 11 97 5.4 -9 684.30 -64.8 -63.7 -64.9 58 -99 SPO 1997 04 03 22 12 97 5.4 -9 684.30 -64.8 -63.7 -65.0 58 -99 SPO 1997 04 03 22 13 95 5.5 -9 684.30 -64.8 -63.6 -65.0 58 -99 SPO 1997 04 03 22 14 95 5.7 -9 684.30 -64.9 -63.6 -65.0 58 -99 SPO 1997 04 03 22 15 95 5.6 -9 684.30 -64.9 -63.6 -65.0 58 -99 SPO 1997 04 03 22 16 96 5.6 -9 684.30 -64.9 -63.7 -65.0 58 -99 SPO 1997 04 03 22 17 97 5.6 -9 684.30 -64.9 -63.8 -65.0 58 -99 SPO 1997 04 03 22 18 96 5.6 -9 684.30 -64.9 -63.8 -65.0 58 -99 SPO 1997 04 03 22 19 98 5.5 -9 684.30 -65.0 -63.8 -65.0 58 -99 SPO 1997 04 03 22 20 98 5.5 -9 684.30 -65.0 -63.8 -65.1 57 -99 SPO 1997 04 03 22 21 98 5.5 -9 684.30 -65.0 -63.8 -65.2 55 -99 SPO 1997 04 03 22 22 98 5.5 -9 684.30 -65.1 -63.8 -65.2 56 -99 SPO 1997 04 03 22 23 98 5.4 -9 684.30 -65.1 -63.8 -65.2 57 -99 SPO 1997 04 03 22 24 99 5.5 -9 684.30 -65.1 -63.7 -65.2 57 -99 SPO 1997 04 03 22 25 100 5.5 -9 684.30 -65.1 -63.7 -65.2 57 -99 SPO 1997 04 03 22 26 100 5.4 -9 684.40 -65.2 -63.7 -65.2 58 -99 SPO 1997 04 03 22 27 100 5.4 -9 684.40 -65.2 -63.7 -65.3 58 -99 SPO 1997 04 03 22 28 100 5.4 -9 684.40 -65.2 -63.8 -65.3 58 -99 SPO 1997 04 03 22 29 100 5.5 -9 684.30 -65.2 -63.8 -65.3 57 -99 SPO 1997 04 03 22 30 98 5.6 -9 684.30 -65.2 -63.8 -65.4 56 -99 SPO 1997 04 03 22 31 97 5.5 -9 684.30 -65.3 -63.8 -65.4 55 -99 SPO 1997 04 03 22 32 96 5.7 -9 684.30 -65.3 -63.9 -65.4 55 -99 SPO 1997 04 03 22 33 94 5.5 -9 684.30 -65.3 -63.9 -65.4 55 -99 SPO 1997 04 03 22 34 94 5.5 -9 684.30 -65.4 -63.9 -65.4 55 -99 SPO 1997 04 03 22 35 95 5.4 -9 684.30 -65.4 -63.8 -65.4 56 -99 SPO 1997 04 03 22 36 95 5.5 -9 684.40 -65.4 -63.8 -65.4 58 -99 SPO 1997 04 03 22 37 95 5.6 -9 684.40 -65.4 -63.8 -65.4 58 -99 SPO 1997 04 03 22 38 94 5.7 -9 684.40 -65.4 -63.8 -65.4 58 -99 SPO 1997 04 03 22 39 93 5.6 -9 684.40 -65.4 -63.8 -65.4 58 -99 SPO 1997 04 03 22 40 95 5.5 -9 684.40 -65.4 -63.8 -65.4 58 -99 SPO 1997 04 03 22 41 95 5.5 -9 684.40 -65.4 -63.9 -65.5 58 -99 SPO 1997 04 03 22 42 96 5.5 -9 684.40 -65.4 -63.8 -65.5 55 -99 SPO 1997 04 03 22 43 97 5.2 -9 684.40 -65.4 -63.8 -65.5 55 -99 SPO 1997 04 03 22 44 98 5.1 -9 684.40 -65.5 -63.9 -65.6 55 -99 SPO 1997 04 03 22 45 97 5.3 -9 684.40 -65.5 -64.0 -65.6 55 -99 SPO 1997 04 03 22 46 96 5.6 -9 684.40 -65.5 -64.0 -65.6 55 -99 SPO 1997 04 03 22 47 95 5.5 -9 684.40 -65.5 -64.0 -65.6 55 -99 SPO 1997 04 03 22 48 97 5.3 -9 684.40 -65.5 -64.0 -65.6 55 -99 SPO 1997 04 03 22 49 97 5.3 -9 684.40 -65.5 -64.0 -65.6 56 -99 SPO 1997 04 03 22 50 94 5.5 -9 684.40 -65.5 -63.9 -65.6 57 -99 SPO 1997 04 03 22 51 92 5.7 -9 684.40 -65.5 -63.9 -65.6 57 -99 SPO 1997 04 03 22 52 92 5.8 -9 684.40 -65.5 -63.8 -65.6 56 -99 SPO 1997 04 03 22 53 93 5.6 -9 684.40 -65.6 -63.8 -65.7 56 -99 SPO 1997 04 03 22 54 94 5.4 -9 684.40 -65.6 -63.7 -65.7 56 -99 SPO 1997 04 03 22 55 93 5.5 -9 684.40 -65.6 -63.7 -65.7 56 -99 SPO 1997 04 03 22 56 90 5.6 -9 684.40 -65.5 -63.7 -65.6 55 -99 SPO 1997 04 03 22 57 90 5.8 -9 684.40 -65.5 -63.6 -65.6 55 -99 SPO 1997 04 03 22 58 90 5.8 -9 684.40 -65.5 -63.6 -65.6 55 -99 SPO 1997 04 03 22 59 90 5.9 -9 684.40 -65.5 -63.6 -65.6 55 -99 SPO 1997 04 03 23 00 89 5.9 -9 684.40 -65.4 -63.6 -65.4 55 0 SPO 1997 04 03 23 01 88 6.0 -9 684.40 -65.4 -63.6 -65.4 58 -99 SPO 1997 04 03 23 02 88 6.2 -9 684.30 -65.3 -63.6 -65.3 58 -99 SPO 1997 04 03 23 03 87 6.2 -9 684.30 -65.2 -63.6 -65.3 57 -99 SPO 1997 04 03 23 04 88 6.3 -9 684.30 -65.2 -63.5 -65.3 58 -99 SPO 1997 04 03 23 05 87 6.3 -9 684.30 -65.1 -63.4 -65.2 57 -99 SPO 1997 04 03 23 06 87 6.1 -9 684.30 -65.1 -63.4 -65.2 57 -99 SPO 1997 04 03 23 07 86 6.0 -9 684.30 -65.1 -63.3 -65.2 58 -99 SPO 1997 04 03 23 08 86 6.0 -9 684.30 -65.0 -63.3 -65.2 57 -99 SPO 1997 04 03 23 09 86 6.1 -9 684.30 -65.1 -63.2 -65.2 58 -99 SPO 1997 04 03 23 10 87 6.2 -9 684.30 -65.0 -63.1 -65.2 57 -99 SPO 1997 04 03 23 11 88 6.3 -9 684.30 -65.0 -63.1 -65.2 58 -99 SPO 1997 04 03 23 12 88 6.4 -9 684.30 -65.0 -63.0 -65.2 58 -99 SPO 1997 04 03 23 13 89 6.5 -9 684.30 -65.0 -62.9 -65.2 59 -99 SPO 1997 04 03 23 14 91 6.5 -9 684.40 -65.0 -63.0 -65.1 59 -99 SPO 1997 04 03 23 15 92 6.3 -9 684.40 -65.0 -63.1 -65.1 59 -99 SPO 1997 04 03 23 16 93 6.3 -9 684.40 -65.0 -63.2 -65.2 59 -99 SPO 1997 04 03 23 17 93 6.2 -9 684.40 -65.0 -63.2 -65.2 59 -99 SPO 1997 04 03 23 18 92 6.1 -9 684.40 -65.0 -63.3 -65.1 59 -99 SPO 1997 04 03 23 19 93 5.9 -9 684.40 -65.0 -63.3 -65.1 59 -99 SPO 1997 04 03 23 20 92 5.8 -9 684.40 -65.0 -63.3 -65.1 59 -99 SPO 1997 04 03 23 21 92 5.8 -9 684.40 -65.0 -63.3 -65.1 58 -99 SPO 1997 04 03 23 22 92 5.9 -9 684.40 -65.0 -63.3 -65.2 59 -99 SPO 1997 04 03 23 23 92 5.9 -9 684.40 -65.0 -63.2 -65.1 -99 -99 SPO 1997 04 03 23 24 93 5.9 -9 684.40 -65.0 -63.2 -65.1 -99 -99 SPO 1997 04 03 23 25 92 6.0 -9 684.40 -65.0 -63.2 -65.1 -99 -99 SPO 1997 04 03 23 26 91 6.0 -9 684.40 -65.0 -63.2 -65.1 -99 -99 SPO 1997 04 03 23 27 90 6.0 -9 684.30 -65.0 -63.3 -65.1 -99 -99 SPO 1997 04 03 23 28 90 6.0 -9 684.40 -65.0 -63.4 -65.1 -99 -99 SPO 1997 04 03 23 29 92 6.0 -9 684.40 -65.0 -63.4 -65.2 59 -99 SPO 1997 04 03 23 30 93 5.9 -9 684.40 -65.1 -63.4 -65.2 60 -99 SPO 1997 04 03 23 31 92 5.9 -9 684.40 -65.1 -63.4 -65.2 60 -99 SPO 1997 04 03 23 32 91 6.0 -9 684.40 -65.1 -63.5 -65.3 60 -99 SPO 1997 04 03 23 33 91 6.0 -9 684.40 -65.2 -63.5 -65.3 60 -99 SPO 1997 04 03 23 34 92 6.2 -9 684.40 -65.2 -63.5 -65.3 58 -99 SPO 1997 04 03 23 35 94 6.5 -9 684.40 -65.2 -63.4 -65.3 58 -99 SPO 1997 04 03 23 36 94 6.7 -9 684.40 -65.2 -63.5 -65.3 60 -99 SPO 1997 04 03 23 37 93 6.8 -9 684.40 -65.2 -63.5 -65.3 60 -99 SPO 1997 04 03 23 38 94 6.7 -9 684.40 -65.2 -63.6 -65.3 61 -99 SPO 1997 04 03 23 39 95 6.5 -9 684.40 -65.2 -63.6 -65.4 61 -99 SPO 1997 04 03 23 40 93 6.2 -9 684.40 -65.3 -63.7 -65.4 61 -99 SPO 1997 04 03 23 41 92 6.1 -9 684.40 -65.3 -63.6 -65.4 59 -99 SPO 1997 04 03 23 42 93 6.1 -9 684.40 -65.3 -63.5 -65.4 58 -99 SPO 1997 04 03 23 43 94 6.1 -9 684.40 -65.3 -63.5 -65.5 58 -99 SPO 1997 04 03 23 44 93 6.1 -9 684.40 -65.4 -63.5 -65.5 58 -99 SPO 1997 04 03 23 45 91 6.0 -9 684.40 -65.4 -63.5 -65.5 58 -99 SPO 1997 04 03 23 46 91 5.9 -9 684.40 -65.5 -63.6 -65.5 59 -99 SPO 1997 04 03 23 47 92 5.8 -9 684.40 -65.5 -63.6 -65.6 59 -99 SPO 1997 04 03 23 48 92 5.7 -9 684.40 -65.5 -63.6 -65.6 59 -99 SPO 1997 04 03 23 49 92 5.6 -9 684.40 -65.5 -63.6 -65.6 58 -99 SPO 1997 04 03 23 50 93 5.5 -9 684.40 -65.6 -63.7 -65.7 58 -99 SPO 1997 04 03 23 51 93 5.6 -9 684.40 -65.6 -63.8 -65.7 57 -99 SPO 1997 04 03 23 52 92 5.5 -9 684.40 -65.6 -63.8 -65.7 56 -99 SPO 1997 04 03 23 53 91 5.3 -9 684.40 -65.6 -63.8 -65.7 56 -99 SPO 1997 04 03 23 54 92 5.2 -9 684.40 -65.7 -63.8 -65.8 56 -99 SPO 1997 04 03 23 55 94 5.2 -9 684.40 -65.7 -63.8 -65.8 54 -99 SPO 1997 04 03 23 56 96 5.2 -9 684.40 -65.7 -63.9 -65.8 53 -99 SPO 1997 04 03 23 57 96 5.2 -9 684.50 -65.7 -64.0 -65.8 53 -99 SPO 1997 04 03 23 58 95 5.1 -9 684.50 -65.7 -64.1 -65.8 -99 -99 SPO 1997 04 03 23 59 94 5.0 -9 684.50 -65.7 -64.1 -65.8 -99 -99 SPO 1997 04 04 00 00 93 5.0 -9 684.40 -65.7 -64.0 -65.8 -99 0 SPO 1997 04 04 00 01 93 5.0 -9 684.40 -65.7 -64.1 -65.8 -99 -99 SPO 1997 04 04 00 02 94 5.1 -9 684.50 -65.7 -64.1 -65.8 -99 -99 SPO 1997 04 04 00 03 94 5.1 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 04 93 5.2 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 05 92 5.1 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 06 91 5.0 -9 684.40 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 07 91 4.9 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 08 91 4.8 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 09 92 4.8 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 10 92 4.9 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 11 94 4.9 -9 684.50 -65.7 -64.2 -65.8 -99 -99 SPO 1997 04 04 00 12 95 4.9 -9 684.50 -65.7 -64.3 -65.8 -99 -99 SPO 1997 04 04 00 13 96 4.8 -9 684.60 -65.7 -64.4 -65.8 57 -99 SPO 1997 04 04 00 14 97 4.7 -9 684.60 -65.8 -64.5 -65.9 57 -99 SPO 1997 04 04 00 15 98 4.7 -9 684.60 -65.8 -64.5 -65.9 57 -99 SPO 1997 04 04 00 16 99 4.7 -9 684.60 -65.8 -64.5 -65.9 56 -99 SPO 1997 04 04 00 17 98 4.8 -9 684.60 -65.8 -64.6 -65.9 56 -99 SPO 1997 04 04 00 18 98 4.8 -9 684.60 -65.8 -64.5 -65.9 55 -99 SPO 1997 04 04 00 19 99 4.8 -9 684.60 -65.8 -64.5 -65.9 56 -99 SPO 1997 04 04 00 20 101 4.9 -9 684.70 -65.8 -64.5 -65.9 55 -99 SPO 1997 04 04 00 21 101 4.8 -9 684.70 -65.7 -64.4 -65.9 55 -99 SPO 1997 04 04 00 22 102 4.7 -9 684.70 -65.7 -64.4 -65.8 56 -99 SPO 1997 04 04 00 23 102 4.7 -9 684.70 -65.7 -64.3 -65.9 56 -99 SPO 1997 04 04 00 24 101 4.6 -9 684.70 -65.8 -64.3 -65.9 57 -99 SPO 1997 04 04 00 25 100 4.6 -9 684.70 -65.8 -64.4 -65.9 57 -99 SPO 1997 04 04 00 26 99 4.5 -9 684.70 -65.7 -64.4 -65.9 56 -99 SPO 1997 04 04 00 27 99 4.6 -9 684.70 -65.8 -64.5 -65.9 57 -99 SPO 1997 04 04 00 28 100 4.7 -9 684.70 -65.8 -64.5 -65.9 56 -99 SPO 1997 04 04 00 29 100 4.7 -9 684.70 -65.8 -64.5 -65.9 56 -99 SPO 1997 04 04 00 30 99 4.7 -9 684.70 -65.8 -64.5 -65.9 56 -99 SPO 1997 04 04 00 31 97 4.7 -9 684.70 -65.8 -64.5 -65.9 57 -99 SPO 1997 04 04 00 32 97 4.8 -9 684.70 -65.8 -64.5 -65.9 57 -99 SPO 1997 04 04 00 33 97 4.8 -9 684.70 -65.8 -64.5 -65.9 57 -99 SPO 1997 04 04 00 34 99 4.7 -9 684.70 -65.8 -64.4 -65.9 57 -99 SPO 1997 04 04 00 35 100 4.8 -9 684.70 -65.8 -64.4 -65.9 57 -99 SPO 1997 04 04 00 36 100 4.8 -9 684.70 -65.8 -64.4 -65.9 57 -99 SPO 1997 04 04 00 37 101 4.9 -9 684.70 -65.8 -64.4 -65.9 57 -99 SPO 1997 04 04 00 38 101 4.9 -9 684.70 -65.8 -64.4 -65.9 57 -99 SPO 1997 04 04 00 39 102 4.9 -9 684.70 -65.8 -64.4 -66.0 55 -99 SPO 1997 04 04 00 40 101 4.8 -9 684.70 -65.9 -64.5 -66.0 55 -99 SPO 1997 04 04 00 41 99 4.8 -9 684.60 -65.9 -64.5 -66.0 56 -99 SPO 1997 04 04 00 42 98 4.8 -9 684.60 -65.9 -64.5 -66.0 56 -99 SPO 1997 04 04 00 43 97 4.8 -9 684.60 -66.0 -64.5 -66.1 57 -99 SPO 1997 04 04 00 44 97 4.8 -9 684.60 -66.0 -64.6 -66.1 56 -99 SPO 1997 04 04 00 45 97 4.9 -9 684.60 -66.1 -64.6 -66.1 56 -99 SPO 1997 04 04 00 46 97 5.1 -9 684.60 -66.1 -64.5 -66.2 57 -99 SPO 1997 04 04 00 47 99 5.1 -9 684.60 -66.1 -64.5 -66.2 57 -99 SPO 1997 04 04 00 48 100 5.2 -9 684.70 -66.1 -64.6 -66.2 57 -99 SPO 1997 04 04 00 49 101 5.1 -9 684.70 -66.2 -64.6 -66.2 58 -99 SPO 1997 04 04 00 50 102 5.2 -9 684.70 -66.2 -64.6 -66.3 57 -99 SPO 1997 04 04 00 51 103 5.1 -9 684.70 -66.2 -64.7 -66.3 55 -99 SPO 1997 04 04 00 52 106 4.9 -9 684.70 -66.2 -64.7 -66.3 55 -99 SPO 1997 04 04 00 53 106 4.9 -9 684.80 -66.2 -64.7 -66.3 54 -99 SPO 1997 04 04 00 54 105 4.9 -9 684.70 -66.3 -64.8 -66.3 54 -99 SPO 1997 04 04 00 55 102 4.8 -9 684.70 -66.3 -64.8 -66.3 55 -99 SPO 1997 04 04 00 56 100 4.8 -9 684.70 -66.3 -64.8 -66.3 55 -99 SPO 1997 04 04 00 57 101 4.9 -9 684.70 -66.3 -64.8 -66.3 55 -99 SPO 1997 04 04 00 58 102 4.9 -9 684.70 -66.3 -64.8 -66.4 55 -99 SPO 1997 04 04 00 59 101 5.1 -9 684.70 -66.3 -64.8 -66.4 56 -99 SPO 1997 04 04 01 00 99 5.1 -9 684.70 -66.3 -64.7 -66.3 56 0 SPO 1997 04 04 01 01 98 5.2 -9 684.70 -66.3 -64.7 -66.3 57 -99 SPO 1997 04 04 01 02 97 5.2 -9 684.70 -66.3 -64.6 -66.3 57 -99 SPO 1997 04 04 01 03 98 5.1 -9 684.70 -66.3 -64.6 -66.3 56 -99 SPO 1997 04 04 01 04 98 5.1 -9 684.70 -66.2 -64.5 -66.3 55 -99 SPO 1997 04 04 01 05 98 5.2 -9 684.70 -66.2 -64.4 -66.3 54 -99 SPO 1997 04 04 01 06 99 5.2 -9 684.70 -66.2 -64.4 -66.3 54 -99 SPO 1997 04 04 01 07 100 5.2 -9 684.70 -66.2 -64.4 -66.3 54 -99 SPO 1997 04 04 01 08 100 5.1 -9 684.70 -66.2 -64.4 -66.3 53 -99 SPO 1997 04 04 01 09 99 5.0 -9 684.70 -66.2 -64.4 -66.3 54 -99 SPO 1997 04 04 01 10 98 5.1 -9 684.70 -66.2 -64.4 -66.2 56 -99 SPO 1997 04 04 01 11 98 5.2 -9 684.70 -66.1 -64.5 -66.2 55 -99 SPO 1997 04 04 01 12 97 5.1 -9 684.70 -66.2 -64.5 -66.2 56 -99 SPO 1997 04 04 01 13 97 5.2 -9 684.70 -66.2 -64.5 -66.2 57 -99 SPO 1997 04 04 01 14 97 5.4 -9 684.70 -66.2 -64.6 -66.2 57 -99 SPO 1997 04 04 01 15 97 5.5 -9 684.70 -66.2 -64.6 -66.3 56 -99 SPO 1997 04 04 01 16 97 5.6 -9 684.70 -66.2 -64.6 -66.3 56 -99 SPO 1997 04 04 01 17 96 5.5 -9 684.60 -66.2 -64.6 -66.2 56 -99 SPO 1997 04 04 01 18 95 5.5 -9 684.60 -66.2 -64.6 -66.2 57 -99 SPO 1997 04 04 01 19 94 5.5 -9 684.60 -66.2 -64.6 -66.3 57 -99 SPO 1997 04 04 01 20 95 5.4 -9 684.60 -66.1 -64.6 -66.2 55 -99 SPO 1997 04 04 01 21 95 5.3 -9 684.60 -66.1 -64.7 -66.2 55 -99 SPO 1997 04 04 01 22 94 5.2 -9 684.70 -66.1 -64.8 -66.2 56 -99 SPO 1997 04 04 01 23 94 5.2 -9 684.60 -66.1 -64.8 -66.2 57 -99 SPO 1997 04 04 01 24 95 5.2 -9 684.60 -66.1 -64.8 -66.2 57 -99 SPO 1997 04 04 01 25 95 5.3 -9 684.60 -66.2 -64.9 -66.3 58 -99 SPO 1997 04 04 01 26 94 5.2 -9 684.70 -66.2 -64.9 -66.3 58 -99 SPO 1997 04 04 01 27 93 5.2 -9 684.70 -66.2 -64.8 -66.3 57 -99 SPO 1997 04 04 01 28 93 5.2 -9 684.70 -66.2 -64.8 -66.3 57 -99 SPO 1997 04 04 01 29 92 5.3 -9 684.60 -66.2 -64.7 -66.3 57 -99 SPO 1997 04 04 01 30 92 5.4 -9 684.70 -66.2 -64.7 -66.3 57 -99 SPO 1997 04 04 01 31 91 5.4 -9 684.70 -66.2 -64.7 -66.3 57 -99 SPO 1997 04 04 01 32 90 5.4 -9 684.60 -66.2 -64.6 -66.3 56 -99 SPO 1997 04 04 01 33 90 5.4 -9 684.60 -66.2 -64.6 -66.3 57 -99 SPO 1997 04 04 01 34 90 5.4 -9 684.60 -66.2 -64.6 -66.3 57 -99 SPO 1997 04 04 01 35 91 5.4 -9 684.60 -66.2 -64.7 -66.3 57 -99 SPO 1997 04 04 01 36 90 5.4 -9 684.60 -66.3 -64.7 -66.3 57 -99 SPO 1997 04 04 01 37 89 5.3 -9 684.60 -66.2 -64.7 -66.3 57 -99 SPO 1997 04 04 01 38 88 5.3 -9 684.60 -66.3 -64.7 -66.3 57 -99 SPO 1997 04 04 01 39 86 5.4 -9 684.60 -66.3 -64.7 -66.3 57 -99 SPO 1997 04 04 01 40 86 5.4 -9 684.60 -66.3 -64.6 -66.3 57 -99 SPO 1997 04 04 01 41 86 5.3 -9 684.60 -66.2 -64.6 -66.3 55 -99 SPO 1997 04 04 01 42 86 5.4 -9 684.60 -66.2 -64.5 -66.3 -99 -99 SPO 1997 04 04 01 43 87 5.4 -9 684.60 -66.2 -64.6 -66.3 -99 -99 SPO 1997 04 04 01 44 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 04 01 45 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 04 01 46 -999 -99.9 -9 684.60 -66.3 -64.6 -66.4 -99 -99 SPO 1997 04 04 01 47 90 5.3 -9 684.60 -66.3 -64.7 -66.3 -99 -99 SPO 1997 04 04 01 48 90 5.2 -9 684.60 -66.3 -64.7 -66.4 58 -99 SPO 1997 04 04 01 49 90 5.2 -9 684.60 -66.2 -64.7 -66.4 57 -99 SPO 1997 04 04 01 50 88 5.2 -9 684.60 -66.3 -64.8 -66.4 57 -99 SPO 1997 04 04 01 51 87 5.2 -9 684.60 -66.3 -64.8 -66.4 56 -99 SPO 1997 04 04 01 52 86 5.2 -9 684.60 -66.3 -64.8 -66.4 56 -99 SPO 1997 04 04 01 53 85 5.3 -9 684.50 -66.3 -64.8 -66.4 56 -99 SPO 1997 04 04 01 54 85 5.3 -9 684.60 -66.3 -64.7 -66.4 57 -99 SPO 1997 04 04 01 55 87 5.3 -9 684.60 -66.3 -64.7 -66.4 56 -99 SPO 1997 04 04 01 56 87 5.2 -9 684.60 -66.3 -64.7 -66.4 56 -99 SPO 1997 04 04 01 57 88 5.0 -9 684.60 -66.3 -64.7 -66.4 57 -99 SPO 1997 04 04 01 58 88 4.8 -9 684.60 -66.3 -64.7 -66.4 58 -99 SPO 1997 04 04 01 59 88 4.5 -9 684.60 -66.4 -64.8 -66.5 59 -99 SPO 1997 04 04 02 00 88 4.4 -9 684.60 -66.4 -64.7 -66.5 58 0 SPO 1997 04 04 02 01 88 4.4 -9 684.70 -66.4 -64.8 -66.5 58 -99 SPO 1997 04 04 02 02 89 4.3 -9 684.70 -66.4 -64.8 -66.5 57 -99 SPO 1997 04 04 02 03 90 4.3 -9 684.60 -66.4 -64.7 -66.5 56 -99 SPO 1997 04 04 02 04 90 4.3 -9 684.60 -66.4 -64.8 -66.5 55 -99 SPO 1997 04 04 02 05 90 4.3 -9 684.60 -66.4 -64.8 -66.5 54 -99 SPO 1997 04 04 02 06 90 4.5 -9 684.60 -66.5 -64.8 -66.5 55 -99 SPO 1997 04 04 02 07 91 4.6 -9 684.60 -66.5 -64.8 -66.6 55 -99 SPO 1997 04 04 02 08 91 4.7 -9 684.60 -66.5 -64.7 -66.6 55 -99 SPO 1997 04 04 02 09 91 4.7 -9 684.60 -66.5 -64.7 -66.5 55 -99 SPO 1997 04 04 02 10 89 4.7 -9 684.60 -66.5 -64.7 -66.6 56 -99 SPO 1997 04 04 02 11 87 4.6 -9 684.60 -66.5 -64.7 -66.6 57 -99 SPO 1997 04 04 02 12 88 4.6 -9 684.60 -66.5 -64.7 -66.6 57 -99 SPO 1997 04 04 02 13 88 4.5 -9 684.60 -66.5 -64.7 -66.6 57 -99 SPO 1997 04 04 02 14 90 4.5 -9 684.60 -66.6 -64.7 -66.6 57 -99 SPO 1997 04 04 02 15 91 4.5 -9 684.60 -66.5 -64.7 -66.6 55 -99 SPO 1997 04 04 02 16 91 4.5 -9 684.60 -66.6 -64.6 -66.6 55 -99 SPO 1997 04 04 02 17 92 4.4 -9 684.70 -66.6 -64.6 -66.7 55 -99 SPO 1997 04 04 02 18 93 4.3 -9 684.70 -66.6 -64.6 -66.7 54 -99 SPO 1997 04 04 02 19 95 4.3 -9 684.70 -66.6 -64.6 -66.7 54 -99 SPO 1997 04 04 02 20 96 4.3 -9 684.70 -66.6 -64.7 -66.6 54 -99 SPO 1997 04 04 02 21 98 4.1 -9 684.70 -66.6 -64.7 -66.6 55 -99 SPO 1997 04 04 02 22 99 4.0 -9 684.70 -66.6 -64.7 -66.7 55 -99 SPO 1997 04 04 02 23 101 4.0 -9 684.70 -66.6 -64.8 -66.7 55 -99 SPO 1997 04 04 02 24 102 3.9 -9 684.70 -66.6 -64.8 -66.7 56 -99 SPO 1997 04 04 02 25 105 3.8 -9 684.70 -66.7 -64.8 -66.7 57 -99 SPO 1997 04 04 02 26 106 3.8 -9 684.70 -66.7 -64.9 -66.7 56 -99 SPO 1997 04 04 02 27 106 3.9 -9 684.70 -66.7 -64.9 -66.8 56 -99 SPO 1997 04 04 02 28 106 4.0 -9 684.80 -66.7 -64.9 -66.8 55 -99 SPO 1997 04 04 02 29 107 4.0 -9 684.70 -66.7 -64.9 -66.8 55 -99 SPO 1997 04 04 02 30 107 4.1 -9 684.80 -66.7 -64.9 -66.8 55 -99 SPO 1997 04 04 02 31 105 4.1 -9 684.70 -66.7 -64.9 -66.7 55 -99 SPO 1997 04 04 02 32 103 4.1 -9 684.70 -66.7 -64.9 -66.7 55 -99 SPO 1997 04 04 02 33 101 4.2 -9 684.70 -66.7 -64.9 -66.7 54 -99 SPO 1997 04 04 02 34 100 4.3 -9 684.70 -66.6 -64.9 -66.7 55 -99 SPO 1997 04 04 02 35 101 4.2 -9 684.70 -66.6 -64.9 -66.7 57 -99 SPO 1997 04 04 02 36 101 4.3 -9 684.70 -66.7 -65.0 -66.7 57 -99 SPO 1997 04 04 02 37 98 4.4 -9 684.70 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 02 38 97 4.5 -9 684.70 -66.6 -64.9 -66.7 56 -99 SPO 1997 04 04 02 39 97 4.5 -9 684.70 -66.6 -65.0 -66.6 57 -99 SPO 1997 04 04 02 40 96 4.7 -9 684.70 -66.5 -65.0 -66.6 56 -99 SPO 1997 04 04 02 41 96 4.8 -9 684.70 -66.5 -65.0 -66.6 55 -99 SPO 1997 04 04 02 42 96 4.9 -9 684.70 -66.4 -64.9 -66.6 54 -99 SPO 1997 04 04 02 43 94 5.0 -9 684.70 -66.4 -65.0 -66.6 55 -99 SPO 1997 04 04 02 44 93 5.0 -9 684.70 -66.4 -65.0 -66.6 57 -99 SPO 1997 04 04 02 45 92 4.9 -9 684.70 -66.4 -65.0 -66.5 58 -99 SPO 1997 04 04 02 46 92 4.9 -9 684.70 -66.4 -65.1 -66.5 58 -99 SPO 1997 04 04 02 47 93 4.9 -9 684.70 -66.4 -65.1 -66.5 57 -99 SPO 1997 04 04 02 48 92 4.9 -9 684.70 -66.4 -65.2 -66.5 58 -99 SPO 1997 04 04 02 49 91 4.9 -9 684.70 -66.4 -65.2 -66.5 59 -99 SPO 1997 04 04 02 50 90 4.9 -9 684.70 -66.4 -65.1 -66.5 59 -99 SPO 1997 04 04 02 51 89 4.9 -9 684.70 -66.4 -65.1 -66.5 60 -99 SPO 1997 04 04 02 52 90 5.0 -9 684.70 -66.4 -65.1 -66.5 59 -99 SPO 1997 04 04 02 53 90 5.0 -9 684.70 -66.4 -65.1 -66.6 59 -99 SPO 1997 04 04 02 54 88 5.1 -9 684.70 -66.4 -65.1 -66.6 58 -99 SPO 1997 04 04 02 55 87 5.1 -9 684.70 -66.4 -65.0 -66.6 59 -99 SPO 1997 04 04 02 56 86 5.1 -9 684.70 -66.4 -65.0 -66.6 58 -99 SPO 1997 04 04 02 57 86 5.2 -9 684.70 -66.5 -64.9 -66.6 59 -99 SPO 1997 04 04 02 58 86 5.3 -9 684.70 -66.5 -64.9 -66.6 59 -99 SPO 1997 04 04 02 59 86 5.4 -9 684.70 -66.5 -64.9 -66.6 60 -99 SPO 1997 04 04 03 00 86 5.5 -9 684.70 -66.5 -64.8 -66.6 59 0 SPO 1997 04 04 03 01 86 5.5 -9 684.70 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 03 02 86 5.4 -9 684.70 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 03 03 87 5.3 -9 684.80 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 03 04 88 5.2 -9 684.80 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 03 05 90 5.0 -9 684.80 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 03 06 91 5.0 -9 684.80 -66.6 -64.8 -66.6 58 -99 SPO 1997 04 04 03 07 91 4.9 -9 684.80 -66.6 -64.9 -66.7 59 -99 SPO 1997 04 04 03 08 91 4.9 -9 684.80 -66.6 -65.0 -66.7 59 -99 SPO 1997 04 04 03 09 92 4.8 -9 684.80 -66.6 -65.0 -66.7 59 -99 SPO 1997 04 04 03 10 92 4.9 -9 684.80 -66.6 -65.0 -66.7 59 -99 SPO 1997 04 04 03 11 91 5.0 -9 684.80 -66.6 -65.0 -66.7 59 -99 SPO 1997 04 04 03 12 91 5.0 -9 684.80 -66.6 -64.9 -66.7 58 -99 SPO 1997 04 04 03 13 90 5.0 -9 684.80 -66.6 -64.9 -66.7 58 -99 SPO 1997 04 04 03 14 91 4.9 -9 684.90 -66.6 -64.9 -66.7 57 -99 SPO 1997 04 04 03 15 92 4.8 -9 684.90 -66.6 -64.9 -66.7 57 -99 SPO 1997 04 04 03 16 94 4.7 -9 684.90 -66.6 -65.0 -66.7 56 -99 SPO 1997 04 04 03 17 94 4.7 -9 684.90 -66.6 -65.0 -66.7 56 -99 SPO 1997 04 04 03 18 94 4.7 -9 684.90 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 03 19 93 4.7 -9 684.90 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 03 20 92 4.8 -9 684.90 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 03 21 92 4.9 -9 684.90 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 03 22 92 4.9 -9 684.90 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 03 23 92 4.9 -9 684.90 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 03 24 91 4.7 -9 684.90 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 03 25 93 4.5 -9 685.00 -66.5 -64.9 -66.7 57 -99 SPO 1997 04 04 03 26 95 4.3 -9 685.00 -66.5 -65.0 -66.6 57 -99 SPO 1997 04 04 03 27 96 4.1 -9 685.00 -66.5 -65.0 -66.7 57 -99 SPO 1997 04 04 03 28 95 4.1 -9 685.00 -66.5 -65.1 -66.6 57 -99 SPO 1997 04 04 03 29 95 4.1 -9 685.00 -66.5 -65.1 -66.6 57 -99 SPO 1997 04 04 03 30 94 4.1 -9 685.00 -66.5 -65.1 -66.6 57 -99 SPO 1997 04 04 03 31 95 4.1 -9 685.00 -66.5 -65.2 -66.7 58 -99 SPO 1997 04 04 03 32 96 4.1 -9 685.00 -66.6 -65.2 -66.7 60 -99 SPO 1997 04 04 03 33 97 4.1 -9 685.00 -66.6 -65.2 -66.7 60 -99 SPO 1997 04 04 03 34 98 4.0 -9 685.00 -66.6 -65.3 -66.7 59 -99 SPO 1997 04 04 03 35 98 3.9 -9 685.00 -66.6 -65.3 -66.7 58 -99 SPO 1997 04 04 03 36 99 3.9 -9 685.00 -66.6 -65.3 -66.8 57 -99 SPO 1997 04 04 03 37 98 4.0 -9 685.00 -66.7 -65.3 -66.8 57 -99 SPO 1997 04 04 03 38 98 4.2 -9 685.00 -66.7 -65.3 -66.8 57 -99 SPO 1997 04 04 03 39 98 4.3 -9 685.00 -66.8 -65.3 -66.9 56 -99 SPO 1997 04 04 03 40 101 4.3 -9 685.00 -66.8 -65.2 -66.9 56 -99 SPO 1997 04 04 03 41 103 4.1 -9 685.00 -66.8 -65.2 -66.8 57 -99 SPO 1997 04 04 03 42 105 4.0 -9 685.10 -66.8 -65.2 -66.9 58 -99 SPO 1997 04 04 03 43 107 4.0 -9 685.10 -66.8 -65.2 -66.9 57 -99 SPO 1997 04 04 03 44 108 3.8 -9 685.10 -66.8 -65.3 -66.9 56 -99 SPO 1997 04 04 03 45 109 3.8 -9 685.20 -66.9 -65.3 -66.9 57 -99 SPO 1997 04 04 03 46 111 3.8 -9 685.20 -66.9 -65.3 -66.9 57 -99 SPO 1997 04 04 03 47 112 3.9 -9 685.20 -66.9 -65.3 -66.9 56 -99 SPO 1997 04 04 03 48 111 4.0 -9 685.20 -66.9 -65.3 -67.0 56 -99 SPO 1997 04 04 03 49 109 4.2 -9 685.20 -66.9 -65.3 -66.9 56 -99 SPO 1997 04 04 03 50 108 4.2 -9 685.20 -66.8 -65.2 -66.9 55 -99 SPO 1997 04 04 03 51 107 4.2 -9 685.20 -66.8 -65.2 -66.8 56 -99 SPO 1997 04 04 03 52 104 4.2 -9 685.20 -66.7 -65.2 -66.8 56 -99 SPO 1997 04 04 03 53 102 4.4 -9 685.20 -66.6 -65.1 -66.8 57 -99 SPO 1997 04 04 03 54 100 4.5 -9 685.20 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 03 55 101 4.6 -9 685.20 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 03 56 102 4.5 -9 685.20 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 03 57 102 4.6 -9 685.20 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 03 58 102 4.6 -9 685.20 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 03 59 101 4.7 -9 685.20 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 04 00 101 4.7 -9 685.20 -66.6 -65.0 -66.7 57 0 SPO 1997 04 04 04 01 101 4.8 -9 685.30 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 04 02 101 5.0 -9 685.30 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 04 03 100 5.0 -9 685.30 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 04 04 100 4.9 -9 685.30 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 04 05 100 4.7 -9 685.30 -66.5 -65.0 -66.7 57 -99 SPO 1997 04 04 04 06 99 4.6 -9 685.30 -66.6 -65.1 -66.7 59 -99 SPO 1997 04 04 04 07 97 4.6 -9 685.30 -66.6 -65.1 -66.7 58 -99 SPO 1997 04 04 04 08 95 4.5 -9 685.30 -66.6 -65.1 -66.7 58 -99 SPO 1997 04 04 04 09 95 4.6 -9 685.30 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 04 10 93 4.8 -9 685.30 -66.6 -64.9 -66.8 57 -99 SPO 1997 04 04 04 11 91 4.9 -9 685.30 -66.6 -64.8 -66.8 57 -99 SPO 1997 04 04 04 12 91 5.0 -9 685.30 -66.7 -64.8 -66.7 57 -99 SPO 1997 04 04 04 13 91 5.0 -9 685.30 -66.7 -64.8 -66.7 57 -99 SPO 1997 04 04 04 14 91 4.9 -9 685.30 -66.7 -64.8 -66.7 57 -99 SPO 1997 04 04 04 15 91 4.9 -9 685.30 -66.7 -64.9 -66.7 58 -99 SPO 1997 04 04 04 16 92 4.9 -9 685.30 -66.7 -64.9 -66.7 58 -99 SPO 1997 04 04 04 17 92 4.8 -9 685.30 -66.7 -64.9 -66.7 58 -99 SPO 1997 04 04 04 18 92 4.8 -9 685.30 -66.6 -64.9 -66.7 58 -99 SPO 1997 04 04 04 19 91 4.9 -9 685.30 -66.6 -65.0 -66.7 58 -99 SPO 1997 04 04 04 20 91 4.9 -9 685.30 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 04 21 90 4.9 -9 685.30 -66.6 -64.9 -66.7 57 -99 SPO 1997 04 04 04 22 90 4.9 -9 685.30 -66.6 -64.9 -66.7 57 -99 SPO 1997 04 04 04 23 89 4.8 -9 685.30 -66.6 -64.9 -66.7 56 -99 SPO 1997 04 04 04 24 90 4.6 -9 685.30 -66.6 -64.9 -66.7 55 -99 SPO 1997 04 04 04 25 91 4.6 -9 685.30 -66.6 -64.9 -66.7 55 -99 SPO 1997 04 04 04 26 91 4.5 -9 685.30 -66.6 -65.0 -66.7 56 -99 SPO 1997 04 04 04 27 91 4.5 -9 685.30 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 04 28 90 4.7 -9 685.30 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 29 89 4.8 -9 685.30 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 30 89 4.8 -9 685.30 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 31 90 4.7 -9 685.30 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 32 90 4.6 -9 685.30 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 33 90 4.6 -9 685.40 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 34 88 4.5 -9 685.40 -66.6 -65.2 -66.7 57 -99 SPO 1997 04 04 04 35 87 4.6 -9 685.40 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 36 86 4.6 -9 685.30 -66.6 -65.1 -66.7 57 -99 SPO 1997 04 04 04 37 86 4.7 -9 685.30 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 04 38 86 4.8 -9 685.30 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 04 39 85 4.9 -9 685.40 -66.6 -65.0 -66.7 57 -99 SPO 1997 04 04 04 40 84 5.0 -9 685.30 -66.6 -64.9 -66.7 57 -99 SPO 1997 04 04 04 41 84 5.0 -9 685.40 -66.5 -64.9 -66.6 57 -99 SPO 1997 04 04 04 42 84 5.0 -9 685.40 -66.5 -64.9 -66.6 57 -99 SPO 1997 04 04 04 43 83 5.0 -9 685.40 -66.5 -64.9 -66.6 57 -99 SPO 1997 04 04 04 44 82 4.9 -9 685.40 -66.5 -64.9 -66.6 57 -99 SPO 1997 04 04 04 45 82 4.8 -9 685.40 -66.5 -64.9 -66.6 57 -99 SPO 1997 04 04 04 46 83 4.7 -9 685.40 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 04 47 83 4.7 -9 685.40 -66.5 -64.9 -66.6 57 -99 SPO 1997 04 04 04 48 83 4.8 -9 685.40 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 04 49 83 5.0 -9 685.40 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 04 50 82 5.0 -9 685.40 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 04 51 82 4.8 -9 685.40 -66.5 -64.8 -66.6 58 -99 SPO 1997 04 04 04 52 81 4.8 -9 685.40 -66.5 -64.7 -66.6 59 -99 SPO 1997 04 04 04 53 82 4.8 -9 685.40 -66.5 -64.7 -66.6 58 -99 SPO 1997 04 04 04 54 82 4.9 -9 685.40 -66.5 -64.7 -66.6 57 -99 SPO 1997 04 04 04 55 83 4.9 -9 685.40 -66.5 -64.7 -66.6 57 -99 SPO 1997 04 04 04 56 84 4.8 -9 685.40 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 04 57 85 4.8 -9 685.40 -66.5 -64.8 -66.6 57 -99 SPO 1997 04 04 04 58 85 4.7 -9 685.40 -66.6 -64.8 -66.6 58 -99 SPO 1997 04 04 04 59 85 4.7 -9 685.40 -66.6 -64.8 -66.7 58 -99 SPO 1997 04 04 05 00 86 4.8 -9 685.40 -66.6 -64.8 -66.7 58 0 SPO 1997 04 04 05 01 87 4.8 -9 685.40 -66.6 -64.8 -66.7 58 -99 SPO 1997 04 04 05 02 90 4.8 -9 685.50 -66.6 -64.8 -66.7 59 -99 SPO 1997 04 04 05 03 90 4.7 -9 685.50 -66.6 -64.7 -66.7 59 -99 SPO 1997 04 04 05 04 89 4.6 -9 685.50 -66.6 -64.7 -66.7 59 -99 SPO 1997 04 04 05 05 88 4.7 -9 685.40 -66.6 -64.8 -66.7 58 -99 SPO 1997 04 04 05 06 87 4.7 -9 685.40 -66.7 -64.8 -66.8 58 -99 SPO 1997 04 04 05 07 85 4.8 -9 685.40 -66.7 -64.8 -66.8 57 -99 SPO 1997 04 04 05 08 85 4.8 -9 685.40 -66.7 -64.7 -66.8 56 -99 SPO 1997 04 04 05 09 85 4.9 -9 685.40 -66.7 -64.6 -66.8 56 -99 SPO 1997 04 04 05 10 84 4.9 -9 685.40 -66.7 -64.5 -66.8 56 -99 SPO 1997 04 04 05 11 84 5.0 -9 685.40 -66.7 -64.5 -66.8 56 -99 SPO 1997 04 04 05 12 84 4.9 -9 685.40 -66.7 -64.5 -66.8 57 -99 SPO 1997 04 04 05 13 83 4.9 -9 685.40 -66.7 -64.4 -66.8 57 -99 SPO 1997 04 04 05 14 82 4.9 -9 685.40 -66.8 -64.4 -66.8 59 -99 SPO 1997 04 04 05 15 81 4.9 -9 685.40 -66.7 -64.3 -66.8 58 -99 SPO 1997 04 04 05 16 81 4.9 -9 685.40 -66.7 -64.3 -66.8 58 -99 SPO 1997 04 04 05 17 82 5.0 -9 685.40 -66.7 -64.2 -66.8 57 -99 SPO 1997 04 04 05 18 82 5.1 -9 685.40 -66.8 -64.2 -66.8 57 -99 SPO 1997 04 04 05 19 83 5.1 -9 685.40 -66.8 -64.2 -66.8 57 -99 SPO 1997 04 04 05 20 82 5.0 -9 685.40 -66.8 -64.2 -66.8 57 -99 SPO 1997 04 04 05 21 83 5.1 -9 685.40 -66.8 -64.1 -66.9 56 -99 SPO 1997 04 04 05 22 82 5.1 -9 685.40 -66.8 -64.1 -66.8 56 -99 SPO 1997 04 04 05 23 83 5.1 -9 685.40 -66.8 -64.2 -66.9 56 -99 SPO 1997 04 04 05 24 83 5.0 -9 685.40 -66.8 -64.2 -66.9 57 -99 SPO 1997 04 04 05 25 83 5.0 -9 685.40 -66.8 -64.2 -66.9 57 -99 SPO 1997 04 04 05 26 83 4.9 -9 685.40 -66.8 -64.2 -66.9 57 -99 SPO 1997 04 04 05 27 84 4.9 -9 685.50 -66.9 -64.2 -66.9 59 -99 SPO 1997 04 04 05 28 84 4.8 -9 685.50 -66.8 -64.2 -66.9 58 -99 SPO 1997 04 04 05 29 84 4.7 -9 685.50 -66.8 -64.2 -66.9 57 -99 SPO 1997 04 04 05 30 85 4.6 -9 685.50 -66.8 -64.1 -66.9 57 -99 SPO 1997 04 04 05 31 88 4.6 -9 685.50 -66.8 -64.0 -66.9 56 -99 SPO 1997 04 04 05 32 88 4.6 -9 685.50 -66.8 -63.9 -66.9 56 -99 SPO 1997 04 04 05 33 88 4.6 -9 685.50 -66.9 -63.8 -66.9 57 -99 SPO 1997 04 04 05 34 88 4.7 -9 685.50 -66.9 -63.7 -66.9 57 -99 SPO 1997 04 04 05 35 87 4.8 -9 685.40 -66.9 -63.6 -67.0 57 -99 SPO 1997 04 04 05 36 88 4.9 -9 685.40 -66.9 -63.6 -67.0 57 -99 SPO 1997 04 04 05 37 88 4.9 -9 685.40 -66.9 -63.7 -66.9 57 -99 SPO 1997 04 04 05 38 89 4.9 -9 685.40 -66.9 -63.7 -66.9 57 -99 SPO 1997 04 04 05 39 89 5.0 -9 685.40 -66.9 -63.6 -67.0 58 -99 SPO 1997 04 04 05 40 89 5.1 -9 685.40 -66.9 -63.6 -67.0 57 -99 SPO 1997 04 04 05 41 88 5.1 -9 685.40 -66.9 -63.7 -67.0 56 -99 SPO 1997 04 04 05 42 87 5.3 -9 685.40 -66.9 -63.6 -67.0 56 -99 SPO 1997 04 04 05 43 87 5.5 -9 685.40 -66.9 -63.5 -66.9 56 -99 SPO 1997 04 04 05 44 87 5.4 -9 685.30 -66.9 -63.4 -66.9 56 -99 SPO 1997 04 04 05 45 87 5.4 -9 685.30 -66.9 -63.4 -67.0 57 -99 SPO 1997 04 04 05 46 87 5.4 -9 685.40 -66.8 -63.5 -66.9 57 -99 SPO 1997 04 04 05 47 87 5.4 -9 685.40 -66.8 -63.5 -66.9 58 -99 SPO 1997 04 04 05 48 87 5.4 -9 685.40 -66.8 -63.5 -66.8 59 -99 SPO 1997 04 04 05 49 87 5.3 -9 685.40 -66.8 -63.6 -66.8 59 -99 SPO 1997 04 04 05 50 88 5.2 -9 685.40 -66.8 -63.7 -66.8 59 -99 SPO 1997 04 04 05 51 89 5.1 -9 685.40 -66.8 -63.8 -66.8 58 -99 SPO 1997 04 04 05 52 91 5.0 -9 685.50 -66.8 -63.8 -66.8 57 -99 SPO 1997 04 04 05 53 91 4.9 -9 685.50 -66.8 -64.0 -66.8 57 -99 SPO 1997 04 04 05 54 93 4.9 -9 685.50 -66.8 -64.0 -66.8 56 -99 SPO 1997 04 04 05 55 93 4.9 -9 685.50 -66.8 -64.1 -66.8 56 -99 SPO 1997 04 04 05 56 93 4.9 -9 685.50 -66.8 -64.2 -66.8 56 -99 SPO 1997 04 04 05 57 93 5.0 -9 685.50 -66.8 -64.2 -66.9 57 -99 SPO 1997 04 04 05 58 93 5.0 -9 685.50 -66.8 -64.2 -66.9 58 -99 SPO 1997 04 04 05 59 92 5.0 -9 685.50 -66.8 -64.2 -66.9 58 -99 SPO 1997 04 04 06 00 94 4.9 -9 685.50 -66.8 -64.2 -66.9 59 0 SPO 1997 04 04 06 01 95 4.7 -9 685.60 -66.8 -64.2 -66.9 59 -99 SPO 1997 04 04 06 02 96 4.6 -9 685.60 -66.8 -64.4 -66.9 59 -99 SPO 1997 04 04 06 03 96 4.5 -9 685.60 -66.8 -64.4 -66.9 58 -99 SPO 1997 04 04 06 04 96 4.5 -9 685.60 -66.8 -64.4 -66.8 57 -99 SPO 1997 04 04 06 05 98 4.6 -9 685.60 -66.7 -64.4 -66.8 56 -99 SPO 1997 04 04 06 06 98 4.6 -9 685.60 -66.7 -64.4 -66.8 55 -99 SPO 1997 04 04 06 07 98 4.6 -9 685.60 -66.8 -64.5 -66.8 56 -99 SPO 1997 04 04 06 08 96 4.6 -9 685.60 -66.8 -64.4 -66.9 56 -99 SPO 1997 04 04 06 09 95 4.6 -9 685.60 -66.8 -64.4 -66.9 57 -99 SPO 1997 04 04 06 10 95 4.6 -9 685.60 -66.9 -64.4 -66.9 58 -99 SPO 1997 04 04 06 11 95 4.6 -9 685.60 -66.9 -64.4 -66.9 58 -99 SPO 1997 04 04 06 12 95 4.7 -9 685.60 -66.9 -64.4 -67.0 58 -99 SPO 1997 04 04 06 13 95 4.7 -9 685.60 -66.9 -64.4 -67.0 58 -99 SPO 1997 04 04 06 14 95 4.9 -9 685.60 -66.9 -64.3 -66.9 58 -99 SPO 1997 04 04 06 15 95 4.9 -9 685.60 -66.8 -64.3 -66.9 56 -99 SPO 1997 04 04 06 16 95 5.0 -9 685.60 -66.8 -64.2 -66.8 57 -99 SPO 1997 04 04 06 17 94 5.1 -9 685.60 -66.8 -64.1 -66.8 57 -99 SPO 1997 04 04 06 18 93 5.1 -9 685.50 -66.8 -64.1 -66.8 57 -99 SPO 1997 04 04 06 19 92 5.2 -9 685.50 -66.8 -64.1 -66.8 57 -99 SPO 1997 04 04 06 20 93 5.3 -9 685.50 -66.7 -64.1 -66.8 57 -99 SPO 1997 04 04 06 21 93 5.3 -9 685.50 -66.7 -64.1 -66.8 58 -99 SPO 1997 04 04 06 22 93 5.2 -9 685.50 -66.7 -64.1 -66.8 59 -99 SPO 1997 04 04 06 23 92 5.1 -9 685.50 -66.7 -64.2 -66.8 59 -99 SPO 1997 04 04 06 24 92 4.8 -9 685.60 -66.8 -64.3 -66.8 60 -99 SPO 1997 04 04 06 25 93 4.7 -9 685.60 -66.8 -64.4 -66.9 60 -99 SPO 1997 04 04 06 26 93 4.7 -9 685.60 -66.8 -64.4 -66.9 59 -99 SPO 1997 04 04 06 27 94 4.7 -9 685.60 -66.8 -64.4 -66.9 58 -99 SPO 1997 04 04 06 28 94 4.7 -9 685.60 -66.8 -64.4 -66.9 57 -99 SPO 1997 04 04 06 29 94 4.7 -9 685.60 -66.8 -64.4 -66.9 56 -99 SPO 1997 04 04 06 30 93 4.7 -9 685.50 -66.9 -64.4 -67.0 57 -99 SPO 1997 04 04 06 31 92 4.7 -9 685.50 -66.9 -64.3 -67.0 57 -99 SPO 1997 04 04 06 32 92 4.8 -9 685.50 -66.9 -64.2 -67.0 57 -99 SPO 1997 04 04 06 33 91 4.9 -9 685.50 -66.9 -64.1 -67.0 57 -99 SPO 1997 04 04 06 34 90 5.1 -9 685.50 -66.9 -64.1 -67.0 57 -99 SPO 1997 04 04 06 35 89 5.2 -9 685.50 -66.9 -64.1 -67.0 58 -99 SPO 1997 04 04 06 36 87 5.3 -9 685.50 -67.0 -64.1 -67.0 59 -99 SPO 1997 04 04 06 37 86 5.4 -9 685.50 -66.9 -64.1 -67.0 58 -99 SPO 1997 04 04 06 38 85 5.4 -9 685.50 -66.9 -64.0 -67.0 58 -99 SPO 1997 04 04 06 39 85 5.4 -9 685.50 -66.9 -63.9 -66.9 57 -99 SPO 1997 04 04 06 40 86 5.3 -9 685.50 -66.9 -63.9 -66.9 57 -99 SPO 1997 04 04 06 41 86 5.3 -9 685.50 -66.8 -63.8 -66.9 56 -99 SPO 1997 04 04 06 42 85 5.2 -9 685.50 -66.8 -63.8 -66.9 56 -99 SPO 1997 04 04 06 43 85 5.2 -9 685.50 -66.8 -63.8 -66.9 57 -99 SPO 1997 04 04 06 44 85 5.2 -9 685.50 -66.8 -63.7 -66.8 57 -99 SPO 1997 04 04 06 45 84 5.2 -9 685.60 -66.8 -63.7 -66.8 58 -99 SPO 1997 04 04 06 46 82 5.2 -9 685.60 -66.7 -63.6 -66.8 58 -99 SPO 1997 04 04 06 47 81 5.2 -9 685.50 -66.7 -63.6 -66.8 57 -99 SPO 1997 04 04 06 48 80 5.3 -9 685.50 -66.7 -63.6 -66.8 57 -99 SPO 1997 04 04 06 49 79 5.3 -9 685.60 -66.7 -63.6 -66.8 57 -99 SPO 1997 04 04 06 50 79 5.3 -9 685.60 -66.7 -63.5 -66.8 57 -99 SPO 1997 04 04 06 51 79 5.1 -9 685.60 -66.7 -63.4 -66.8 57 -99 SPO 1997 04 04 06 52 80 5.0 -9 685.70 -66.7 -63.4 -66.8 57 -99 SPO 1997 04 04 06 53 80 5.0 -9 685.70 -66.7 -63.4 -66.8 57 -99 SPO 1997 04 04 06 54 81 5.0 -9 685.70 -66.7 -63.5 -66.8 57 -99 SPO 1997 04 04 06 55 80 5.0 -9 685.70 -66.7 -63.4 -66.8 58 -99 SPO 1997 04 04 06 56 80 5.1 -9 685.70 -66.7 -63.4 -66.8 58 -99 SPO 1997 04 04 06 57 79 5.2 -9 685.70 -66.7 -63.3 -66.8 58 -99 SPO 1997 04 04 06 58 78 5.2 -9 685.70 -66.7 -63.2 -66.8 57 -99 SPO 1997 04 04 06 59 77 5.2 -9 685.70 -66.7 -63.1 -66.8 57 -99 SPO 1997 04 04 07 00 78 5.1 -9 685.70 -66.8 -63.1 -66.8 57 0 SPO 1997 04 04 07 01 80 5.0 -9 685.70 -66.8 -63.2 -66.8 56 -99 SPO 1997 04 04 07 02 79 4.9 -9 685.70 -66.8 -63.2 -66.8 55 -99 SPO 1997 04 04 07 03 79 4.8 -9 685.70 -66.8 -63.2 -66.8 56 -99 SPO 1997 04 04 07 04 79 4.7 -9 685.70 -66.8 -63.3 -66.9 56 -99 SPO 1997 04 04 07 05 79 4.7 -9 685.70 -66.8 -63.3 -66.9 56 -99 SPO 1997 04 04 07 06 79 4.7 -9 685.70 -66.8 -63.3 -66.9 57 -99 SPO 1997 04 04 07 07 79 4.7 -9 685.80 -66.8 -63.4 -66.9 58 -99 SPO 1997 04 04 07 08 80 4.6 -9 685.80 -66.8 -63.4 -66.9 58 -99 SPO 1997 04 04 07 09 83 4.6 -9 685.80 -66.8 -63.5 -66.9 58 -99 SPO 1997 04 04 07 10 83 4.6 -9 685.80 -66.8 -63.5 -66.9 58 -99 SPO 1997 04 04 07 11 82 4.5 -9 685.80 -66.8 -63.5 -66.9 58 -99 SPO 1997 04 04 07 12 81 4.6 -9 685.80 -66.9 -63.5 -66.9 57 -99 SPO 1997 04 04 07 13 80 4.7 -9 685.80 -66.9 -63.5 -67.0 56 -99 SPO 1997 04 04 07 14 80 4.8 -9 685.80 -66.9 -63.4 -67.0 56 -99 SPO 1997 04 04 07 15 82 4.9 -9 685.80 -66.9 -63.3 -67.0 56 -99 SPO 1997 04 04 07 16 83 4.8 -9 685.80 -66.9 -63.3 -67.0 55 -99 SPO 1997 04 04 07 17 84 4.7 -9 685.80 -66.9 -63.3 -67.0 55 -99 SPO 1997 04 04 07 18 86 4.5 -9 685.80 -67.0 -63.4 -67.0 56 -99 SPO 1997 04 04 07 19 87 4.3 -9 685.80 -67.0 -63.4 -67.1 57 -99 SPO 1997 04 04 07 20 88 4.3 -9 685.90 -67.0 -63.4 -67.1 57 -99 SPO 1997 04 04 07 21 88 4.2 -9 685.90 -67.1 -63.4 -67.1 58 -99 SPO 1997 04 04 07 22 88 4.1 -9 685.90 -67.1 -63.5 -67.1 59 -99 SPO 1997 04 04 07 23 88 4.1 -9 685.90 -67.1 -63.5 -67.2 57 -99 SPO 1997 04 04 07 24 90 4.1 -9 685.90 -67.2 -63.4 -67.2 57 -99 SPO 1997 04 04 07 25 92 3.9 -9 686.00 -67.2 -63.4 -67.2 56 -99 SPO 1997 04 04 07 26 94 3.8 -9 686.00 -67.2 -63.4 -67.2 56 -99 SPO 1997 04 04 07 27 96 3.7 -9 686.00 -67.2 -63.4 -67.2 56 -99 SPO 1997 04 04 07 28 98 3.7 -9 686.10 -67.2 -63.4 -67.2 56 -99 SPO 1997 04 04 07 29 100 3.7 -9 686.10 -67.2 -63.4 -67.2 56 -99 SPO 1997 04 04 07 30 103 3.8 -9 686.10 -67.0 -63.4 -67.1 56 -99 SPO 1997 04 04 07 31 103 4.0 -9 686.10 -67.0 -63.4 -67.0 57 -99 SPO 1997 04 04 07 32 102 4.1 -9 686.10 -67.0 -63.4 -67.1 58 -99 SPO 1997 04 04 07 33 101 4.1 -9 686.10 -67.1 -63.4 -67.2 59 -99 SPO 1997 04 04 07 34 100 4.1 -9 686.10 -67.1 -63.4 -67.1 59 -99 SPO 1997 04 04 07 35 102 3.8 -9 686.10 -67.1 -63.4 -67.1 58 -99 SPO 1997 04 04 07 36 102 3.9 -9 686.10 -67.1 -63.4 -67.1 58 -99 SPO 1997 04 04 07 37 102 3.9 -9 686.10 -67.1 -63.4 -67.1 57 -99 SPO 1997 04 04 07 38 103 3.9 -9 686.10 -67.0 -63.4 -67.1 56 -99 SPO 1997 04 04 07 39 105 4.0 -9 686.10 -67.0 -63.4 -67.0 56 -99 SPO 1997 04 04 07 40 108 4.1 -9 686.10 -66.9 -63.5 -67.0 56 -99 SPO 1997 04 04 07 41 112 3.9 -9 686.10 -66.9 -63.5 -67.0 57 -99 SPO 1997 04 04 07 42 115 3.9 -9 686.20 -66.8 -63.6 -66.9 57 -99 SPO 1997 04 04 07 43 113 4.0 -9 686.20 -66.8 -63.6 -66.9 58 -99 SPO 1997 04 04 07 44 112 4.3 -9 686.20 -66.8 -63.6 -66.9 58 -99 SPO 1997 04 04 07 45 110 4.4 -9 686.10 -66.8 -63.6 -66.9 56 -99 SPO 1997 04 04 07 46 107 4.3 -9 686.10 -66.8 -63.6 -66.9 56 -99 SPO 1997 04 04 07 47 106 4.4 -9 686.10 -66.8 -63.6 -66.9 57 -99 SPO 1997 04 04 07 48 105 4.5 -9 686.10 -66.8 -63.6 -66.9 58 -99 SPO 1997 04 04 07 49 105 4.6 -9 686.10 -66.8 -63.6 -66.8 58 -99 SPO 1997 04 04 07 50 106 4.8 -9 686.10 -66.8 -63.5 -66.8 59 -99 SPO 1997 04 04 07 51 106 4.7 -9 686.10 -66.7 -63.5 -66.8 59 -99 SPO 1997 04 04 07 52 105 4.6 -9 686.10 -66.7 -63.5 -66.8 59 -99 SPO 1997 04 04 07 53 105 4.7 -9 686.10 -66.7 -63.5 -66.8 60 -99 SPO 1997 04 04 07 54 101 4.7 -9 686.10 -66.7 -63.4 -66.8 60 -99 SPO 1997 04 04 07 55 100 4.8 -9 686.00 -66.7 -63.4 -66.8 60 -99 SPO 1997 04 04 07 56 99 5.0 -9 686.00 -66.7 -63.3 -66.8 60 -99 SPO 1997 04 04 07 57 98 5.0 -9 686.00 -66.7 -63.3 -66.8 59 -99 SPO 1997 04 04 07 58 98 4.9 -9 686.00 -66.7 -63.2 -66.8 58 -99 SPO 1997 04 04 07 59 98 4.7 -9 686.10 -66.7 -63.2 -66.8 57 -99 SPO 1997 04 04 08 00 99 4.6 -9 686.10 -66.7 -63.3 -66.8 57 0 SPO 1997 04 04 08 01 99 4.7 -9 686.10 -66.7 -63.4 -66.8 56 -99 SPO 1997 04 04 08 02 99 4.9 -9 686.10 -66.7 -63.3 -66.8 57 -99 SPO 1997 04 04 08 03 98 5.0 -9 686.10 -66.7 -63.3 -66.8 57 -99 SPO 1997 04 04 08 04 97 5.2 -9 686.10 -66.7 -63.2 -66.8 58 -99 SPO 1997 04 04 08 05 95 5.3 -9 686.10 -66.7 -63.2 -66.8 58 -99 SPO 1997 04 04 08 06 93 5.4 -9 686.10 -66.7 -63.1 -66.8 58 -99 SPO 1997 04 04 08 07 91 5.5 -9 686.00 -66.7 -63.1 -66.8 58 -99 SPO 1997 04 04 08 08 90 5.5 -9 686.00 -66.7 -63.1 -66.8 58 -99 SPO 1997 04 04 08 09 89 5.4 -9 686.10 -66.7 -63.1 -66.8 57 -99 SPO 1997 04 04 08 10 89 5.2 -9 686.10 -66.7 -63.1 -66.8 57 -99 SPO 1997 04 04 08 11 89 5.1 -9 686.10 -66.7 -63.0 -66.8 57 -99 SPO 1997 04 04 08 12 86 5.1 -9 686.10 -66.7 -63.0 -66.8 57 -99 SPO 1997 04 04 08 13 85 5.2 -9 686.10 -66.7 -62.9 -66.8 56 -99 SPO 1997 04 04 08 14 85 5.3 -9 686.10 -66.7 -62.9 -66.8 56 -99 SPO 1997 04 04 08 15 86 5.4 -9 686.10 -66.7 -62.9 -66.8 57 -99 SPO 1997 04 04 08 16 87 5.5 -9 686.10 -66.7 -62.9 -66.8 57 -99 SPO 1997 04 04 08 17 86 5.5 -9 686.10 -66.8 -62.9 -66.8 58 -99 SPO 1997 04 04 08 18 87 5.6 -9 686.10 -66.8 -62.8 -66.8 58 -99 SPO 1997 04 04 08 19 87 5.7 -9 686.10 -66.8 -62.6 -66.8 58 -99 SPO 1997 04 04 08 20 87 5.7 -9 686.10 -66.8 -62.5 -66.8 58 -99 SPO 1997 04 04 08 21 89 5.6 -9 686.10 -66.8 -62.4 -66.8 57 -99 SPO 1997 04 04 08 22 88 5.6 -9 686.10 -66.8 -62.2 -66.8 56 -99 SPO 1997 04 04 08 23 87 5.5 -9 686.10 -66.8 -62.2 -66.8 56 -99 SPO 1997 04 04 08 24 87 5.3 -9 686.10 -66.8 -62.2 -66.9 56 -99 SPO 1997 04 04 08 25 89 5.3 -9 686.20 -66.8 -62.1 -66.9 57 -99 SPO 1997 04 04 08 26 89 5.2 -9 686.20 -66.8 -62.2 -66.9 57 -99 SPO 1997 04 04 08 27 88 5.0 -9 686.20 -66.9 -62.4 -66.9 59 -99 SPO 1997 04 04 08 28 89 4.8 -9 686.20 -66.9 -62.6 -66.9 58 -99 SPO 1997 04 04 08 29 91 4.6 -9 686.30 -66.9 -62.8 -66.9 58 -99 SPO 1997 04 04 08 30 91 4.6 -9 686.30 -66.9 -63.1 -67.0 57 -99 SPO 1997 04 04 08 31 92 4.6 -9 686.30 -66.9 -63.2 -67.0 56 -99 SPO 1997 04 04 08 32 93 4.6 -9 686.30 -66.9 -63.2 -67.0 56 -99 SPO 1997 04 04 08 33 94 4.5 -9 686.30 -66.9 -63.1 -67.0 56 -99 SPO 1997 04 04 08 34 94 4.4 -9 686.30 -66.9 -63.1 -67.0 56 -99 SPO 1997 04 04 08 35 93 4.5 -9 686.30 -66.9 -63.0 -67.0 56 -99 SPO 1997 04 04 08 36 91 4.6 -9 686.30 -66.9 -62.9 -67.0 56 -99 SPO 1997 04 04 08 37 90 4.8 -9 686.30 -67.0 -62.8 -67.0 58 -99 SPO 1997 04 04 08 38 90 4.9 -9 686.20 -66.9 -62.5 -67.0 57 -99 SPO 1997 04 04 08 39 89 4.9 -9 686.20 -66.9 -62.3 -67.0 58 -99 SPO 1997 04 04 08 40 89 4.9 -9 686.20 -66.9 -62.4 -67.0 58 -99 SPO 1997 04 04 08 41 89 4.9 -9 686.20 -66.9 -62.2 -67.0 59 -99 SPO 1997 04 04 08 42 89 4.9 -9 686.20 -66.9 -62.2 -67.0 57 -99 SPO 1997 04 04 08 43 89 4.9 -9 686.20 -66.9 -62.4 -66.9 56 -99 SPO 1997 04 04 08 44 88 5.0 -9 686.20 -66.8 -62.4 -66.9 56 -99 SPO 1997 04 04 08 45 88 5.2 -9 686.10 -66.8 -62.2 -66.9 57 -99 SPO 1997 04 04 08 46 86 5.3 -9 686.10 -66.8 -62.1 -66.9 57 -99 SPO 1997 04 04 08 47 86 5.3 -9 686.10 -66.8 -62.0 -66.9 58 -99 SPO 1997 04 04 08 48 84 5.4 -9 686.10 -66.8 -62.0 -66.9 58 -99 SPO 1997 04 04 08 49 83 5.5 -9 686.10 -66.8 -62.0 -66.9 58 -99 SPO 1997 04 04 08 50 83 5.5 -9 686.10 -66.8 -62.0 -66.9 58 -99 SPO 1997 04 04 08 51 83 5.4 -9 686.10 -66.8 -61.9 -66.9 59 -99 SPO 1997 04 04 08 52 85 5.4 -9 686.10 -66.8 -61.8 -66.9 59 -99 SPO 1997 04 04 08 53 85 5.3 -9 686.10 -66.8 -61.7 -66.9 59 -99 SPO 1997 04 04 08 54 85 5.4 -9 686.10 -66.8 -61.7 -66.9 59 -99 SPO 1997 04 04 08 55 85 5.5 -9 686.10 -66.8 -61.7 -66.9 58 -99 SPO 1997 04 04 08 56 83 5.6 -9 686.10 -66.8 -61.7 -66.9 58 -99 SPO 1997 04 04 08 57 81 5.7 -9 686.10 -66.8 -61.6 -66.9 57 -99 SPO 1997 04 04 08 58 80 5.8 -9 686.10 -66.8 -61.6 -66.8 57 -99 SPO 1997 04 04 08 59 80 5.7 -9 686.10 -66.8 -61.6 -66.8 57 -99 SPO 1997 04 04 09 00 81 5.7 -9 686.10 -66.8 -61.7 -66.8 58 0 SPO 1997 04 04 09 01 83 5.7 -9 686.10 -66.8 -61.7 -66.8 58 -99 SPO 1997 04 04 09 02 82 5.8 -9 686.10 -66.8 -61.7 -66.8 58 -99 SPO 1997 04 04 09 03 83 5.9 -9 686.10 -66.7 -61.7 -66.8 58 -99 SPO 1997 04 04 09 04 83 6.0 -9 686.10 -66.7 -61.6 -66.7 58 -99 SPO 1997 04 04 09 05 81 6.0 -9 686.10 -66.6 -61.6 -66.7 58 -99 SPO 1997 04 04 09 06 80 5.9 -9 686.10 -66.6 -61.6 -66.7 58 -99 SPO 1997 04 04 09 07 79 5.9 -9 686.10 -66.6 -61.7 -66.7 59 -99 SPO 1997 04 04 09 08 79 6.0 -9 686.10 -66.6 -61.7 -66.7 58 -99 SPO 1997 04 04 09 09 79 6.0 -9 686.10 -66.6 -61.7 -66.8 57 -99 SPO 1997 04 04 09 10 79 5.9 -9 686.10 -66.7 -61.8 -66.7 58 -99 SPO 1997 04 04 09 11 79 5.8 -9 686.10 -66.6 -61.8 -66.7 57 -99 SPO 1997 04 04 09 12 80 5.8 -9 686.10 -66.6 -61.9 -66.7 57 -99 SPO 1997 04 04 09 13 81 5.8 -9 686.10 -66.6 -62.0 -66.7 57 -99 SPO 1997 04 04 09 14 83 5.6 -9 686.20 -66.6 -62.0 -66.6 57 -99 SPO 1997 04 04 09 15 85 5.3 -9 686.20 -66.5 -62.0 -66.6 57 -99 SPO 1997 04 04 09 16 86 5.2 -9 686.20 -66.5 -62.0 -66.6 57 -99 SPO 1997 04 04 09 17 87 5.1 -9 686.20 -66.5 -62.0 -66.6 58 -99 SPO 1997 04 04 09 18 86 5.0 -9 686.20 -66.5 -62.1 -66.6 57 -99 SPO 1997 04 04 09 19 84 5.1 -9 686.20 -66.5 -62.1 -66.7 57 -99 SPO 1997 04 04 09 20 83 5.3 -9 686.20 -66.6 -62.1 -66.7 58 -99 SPO 1997 04 04 09 21 82 5.5 -9 686.20 -66.6 -62.0 -66.7 58 -99 SPO 1997 04 04 09 22 81 5.6 -9 686.20 -66.6 -62.0 -66.7 58 -99 SPO 1997 04 04 09 23 80 5.8 -9 686.20 -66.6 -61.9 -66.7 58 -99 SPO 1997 04 04 09 24 80 5.9 -9 686.20 -66.6 -61.9 -66.7 57 -99 SPO 1997 04 04 09 25 79 5.8 -9 686.10 -66.6 -61.9 -66.7 57 -99 SPO 1997 04 04 09 26 78 5.8 -9 686.20 -66.6 -61.9 -66.7 57 -99 SPO 1997 04 04 09 27 79 5.6 -9 686.20 -66.6 -61.9 -66.7 57 -99 SPO 1997 04 04 09 28 79 5.5 -9 686.20 -66.7 -61.9 -66.7 58 -99 SPO 1997 04 04 09 29 78 5.5 -9 686.20 -66.7 -62.0 -66.7 58 -99 SPO 1997 04 04 09 30 78 5.5 -9 686.20 -66.7 -62.0 -66.7 58 -99 SPO 1997 04 04 09 31 78 5.4 -9 686.20 -66.7 -62.0 -66.7 57 -99 SPO 1997 04 04 09 32 78 5.2 -9 686.20 -66.6 -62.0 -66.7 57 -99 SPO 1997 04 04 09 33 79 5.2 -9 686.30 -66.6 -62.0 -66.8 57 -99 SPO 1997 04 04 09 34 79 5.1 -9 686.30 -66.7 -62.0 -66.8 57 -99 SPO 1997 04 04 09 35 80 5.0 -9 686.30 -66.7 -62.0 -66.8 57 -99 SPO 1997 04 04 09 36 80 5.0 -9 686.30 -66.7 -61.9 -66.8 57 -99 SPO 1997 04 04 09 37 81 4.9 -9 686.30 -66.7 -61.9 -66.8 57 -99 SPO 1997 04 04 09 38 82 4.6 -9 686.30 -66.8 -61.9 -66.8 58 -99 SPO 1997 04 04 09 39 83 4.5 -9 686.40 -66.8 -61.9 -66.8 57 -99 SPO 1997 04 04 09 40 86 4.5 -9 686.40 -66.8 -61.9 -66.9 56 -99 SPO 1997 04 04 09 41 88 4.4 -9 686.40 -66.8 -62.0 -66.9 56 -99 SPO 1997 04 04 09 42 87 4.4 -9 686.40 -66.9 -62.2 -67.0 58 -99 SPO 1997 04 04 09 43 87 4.4 -9 686.40 -67.0 -62.2 -67.0 58 -99 SPO 1997 04 04 09 44 90 4.2 -9 686.40 -67.0 -62.2 -67.1 58 -99 SPO 1997 04 04 09 45 94 4.0 -9 686.50 -67.1 -62.3 -67.1 58 -99 SPO 1997 04 04 09 46 95 4.0 -9 686.50 -67.2 -62.4 -67.2 59 -99 SPO 1997 04 04 09 47 96 4.0 -9 686.50 -67.2 -62.5 -67.2 58 -99 SPO 1997 04 04 09 48 98 3.8 -9 686.50 -67.3 -62.5 -67.3 59 -99 SPO 1997 04 04 09 49 100 3.7 -9 686.60 -67.3 -62.6 -67.3 58 -99 SPO 1997 04 04 09 50 102 3.9 -9 686.60 -67.4 -62.7 -67.3 58 -99 SPO 1997 04 04 09 51 104 4.0 -9 686.60 -67.4 -62.7 -67.4 57 -99 SPO 1997 04 04 09 52 105 3.9 -9 686.60 -67.4 -62.7 -67.4 56 -99 SPO 1997 04 04 09 53 107 3.9 -9 686.60 -67.5 -62.8 -67.5 56 -99 SPO 1997 04 04 09 54 110 3.8 -9 686.70 -67.5 -62.8 -67.4 56 -99 SPO 1997 04 04 09 55 113 3.5 -9 686.70 -67.5 -63.0 -67.4 56 -99 SPO 1997 04 04 09 56 129 2.6 -9 686.80 -67.4 -63.4 -67.3 56 -99 SPO 1997 04 04 09 57 145 1.5 -9 686.80 -67.2 -64.0 -67.3 55 -99 SPO 1997 04 04 09 58 140 2.2 -9 686.80 -67.3 -64.4 -67.4 56 -99 SPO 1997 04 04 09 59 130 2.9 -9 686.80 -67.2 -64.3 -67.3 56 -99 SPO 1997 04 04 10 00 131 3.1 -9 686.80 -66.9 -64.2 -67.0 56 0 SPO 1997 04 04 10 01 134 2.9 -9 686.80 -66.6 -64.2 -66.8 56 -99 SPO 1997 04 04 10 02 131 2.9 -9 686.80 -66.4 -64.4 -66.8 57 -99 SPO 1997 04 04 10 03 129 3.0 -9 686.80 -66.4 -64.5 -66.8 57 -99 SPO 1997 04 04 10 04 132 2.8 -9 686.90 -66.4 -64.6 -66.8 57 -99 SPO 1997 04 04 10 05 133 2.7 -9 686.90 -66.4 -64.6 -66.8 57 -99 SPO 1997 04 04 10 06 124 3.0 -9 686.90 -66.4 -64.7 -66.8 58 -99 SPO 1997 04 04 10 07 115 3.4 -9 686.90 -66.4 -64.5 -66.8 58 -99 SPO 1997 04 04 10 08 113 3.6 -9 686.80 -66.5 -64.3 -66.8 59 -99 SPO 1997 04 04 10 09 112 3.5 -9 686.80 -66.6 -64.2 -66.9 59 -99 SPO 1997 04 04 10 10 111 3.6 -9 686.90 -66.7 -64.2 -66.9 59 -99 SPO 1997 04 04 10 11 111 3.6 -9 686.90 -66.7 -64.2 -66.9 59 -99 SPO 1997 04 04 10 12 114 3.2 -9 686.90 -66.8 -64.2 -67.0 59 -99 SPO 1997 04 04 10 13 123 2.6 -9 687.00 -66.9 -64.4 -67.0 59 -99 SPO 1997 04 04 10 14 131 1.9 -9 687.00 -66.8 -64.6 -67.0 57 -99 SPO 1997 04 04 10 15 129 2.3 -9 687.00 -66.8 -64.8 -67.0 56 -99 SPO 1997 04 04 10 16 126 2.6 -9 687.00 -66.8 -64.9 -67.0 56 -99 SPO 1997 04 04 10 17 121 2.9 -9 687.00 -66.7 -64.9 -66.9 57 -99 SPO 1997 04 04 10 18 116 3.2 -9 687.00 -66.6 -64.8 -66.8 57 -99 SPO 1997 04 04 10 19 111 3.4 -9 687.00 -66.6 -64.7 -66.8 57 -99 SPO 1997 04 04 10 20 107 3.3 -9 687.00 -66.8 -64.6 -66.9 59 -99 SPO 1997 04 04 10 21 105 3.0 -9 686.90 -66.8 -64.7 -67.0 58 -99 SPO 1997 04 04 10 22 103 2.7 -9 687.00 -66.9 -64.8 -67.0 57 -99 SPO 1997 04 04 10 23 101 2.6 -9 687.00 -67.0 -64.9 -67.1 57 -99 SPO 1997 04 04 10 24 101 2.6 -9 687.00 -67.0 -64.9 -67.1 57 -99 SPO 1997 04 04 10 25 100 2.6 -9 687.00 -67.1 -64.8 -67.1 58 -99 SPO 1997 04 04 10 26 94 2.8 -9 686.90 -67.1 -64.8 -67.1 58 -99 SPO 1997 04 04 10 27 91 3.0 -9 686.90 -67.1 -64.6 -67.1 58 -99 SPO 1997 04 04 10 28 91 3.3 -9 686.90 -67.1 -64.4 -67.1 58 -99 SPO 1997 04 04 10 29 90 3.2 -9 686.90 -67.1 -64.2 -67.2 57 -99 SPO 1997 04 04 10 30 88 3.2 -9 686.90 -67.1 -64.1 -67.2 58 -99 SPO 1997 04 04 10 31 88 3.3 -9 686.90 -67.1 -63.9 -67.1 58 -99 SPO 1997 04 04 10 32 89 3.4 -9 686.90 -67.1 -63.8 -67.1 57 -99 SPO 1997 04 04 10 33 89 3.2 -9 687.00 -67.1 -63.7 -67.1 57 -99 SPO 1997 04 04 10 34 90 3.1 -9 687.00 -67.1 -63.6 -67.2 57 -99 SPO 1997 04 04 10 35 93 3.1 -9 687.00 -67.1 -63.6 -67.2 56 -99 SPO 1997 04 04 10 36 93 3.0 -9 687.00 -67.1 -63.6 -67.2 56 -99 SPO 1997 04 04 10 37 92 3.0 -9 687.00 -67.1 -63.6 -67.2 55 -99 SPO 1997 04 04 10 38 90 3.4 -9 686.90 -67.2 -63.6 -67.2 56 -99 SPO 1997 04 04 10 39 88 3.5 -9 686.90 -67.2 -63.6 -67.2 56 -99 SPO 1997 04 04 10 40 87 3.3 -9 686.90 -67.2 -63.5 -67.2 56 -99 SPO 1997 04 04 10 41 85 3.4 -9 687.00 -67.3 -63.6 -67.3 57 -99 SPO 1997 04 04 10 42 84 3.7 -9 686.90 -67.3 -63.5 -67.3 57 -99 SPO 1997 04 04 10 43 82 4.0 -9 686.90 -67.3 -63.4 -67.3 56 -99 SPO 1997 04 04 10 44 81 4.1 -9 686.90 -67.3 -63.4 -67.4 56 -99 SPO 1997 04 04 10 45 80 4.0 -9 686.90 -67.3 -63.4 -67.4 56 -99 SPO 1997 04 04 10 46 79 4.0 -9 686.90 -67.3 -63.4 -67.4 56 -99 SPO 1997 04 04 10 47 79 3.9 -9 686.90 -67.3 -63.4 -67.4 56 -99 SPO 1997 04 04 10 48 75 3.7 -9 686.90 -67.3 -63.3 -67.4 56 -99 SPO 1997 04 04 10 49 73 3.8 -9 686.90 -67.2 -63.3 -67.3 55 -99 SPO 1997 04 04 10 50 72 4.1 -9 686.90 -67.2 -63.2 -67.3 55 -99 SPO 1997 04 04 10 51 71 4.2 -9 686.90 -67.2 -63.2 -67.2 55 -99 SPO 1997 04 04 10 52 71 4.2 -9 686.90 -67.1 -63.2 -67.1 55 -99 SPO 1997 04 04 10 53 71 4.3 -9 686.90 -67.0 -63.2 -67.1 55 -99 SPO 1997 04 04 10 54 68 4.3 -9 686.90 -66.9 -63.2 -67.0 55 -99 SPO 1997 04 04 10 55 67 4.6 -9 686.80 -66.9 -63.2 -66.9 56 -99 SPO 1997 04 04 10 56 67 4.8 -9 686.80 -66.8 -63.1 -66.9 56 -99 SPO 1997 04 04 10 57 65 4.7 -9 686.80 -66.8 -63.0 -66.9 56 -99 SPO 1997 04 04 10 58 64 4.5 -9 686.80 -66.7 -63.0 -66.9 57 -99 SPO 1997 04 04 10 59 63 4.5 -9 686.80 -66.7 -62.9 -66.8 57 -99 SPO 1997 04 04 11 00 60 4.0 -9 686.80 -66.7 -62.8 -66.8 58 0 SPO 1997 04 04 11 01 51 3.0 -9 686.80 -66.6 -63.0 -66.8 58 -99 SPO 1997 04 04 11 02 49 2.7 -9 686.80 -66.6 -63.2 -66.8 58 -99 SPO 1997 04 04 11 03 57 2.5 -9 686.90 -66.6 -63.2 -66.7 59 -99 SPO 1997 04 04 11 04 51 2.1 -9 686.90 -66.6 -63.4 -66.8 59 -99 SPO 1997 04 04 11 05 29 1.6 -9 686.90 -66.5 -64.0 -66.7 58 -99 SPO 1997 04 04 11 06 32 1.7 -9 687.00 -66.5 -64.6 -66.6 59 -99 SPO 1997 04 04 11 07 56 2.6 -9 687.00 -66.4 -64.4 -66.6 60 -99 SPO 1997 04 04 11 08 62 3.6 -9 687.00 -66.3 -63.7 -66.5 60 -99 SPO 1997 04 04 11 09 65 4.1 -9 686.90 -66.2 -63.4 -66.4 59 -99 SPO 1997 04 04 11 10 65 4.0 -9 686.90 -66.2 -63.2 -66.4 60 -99 SPO 1997 04 04 11 11 63 3.5 -9 687.00 -66.2 -63.1 -66.4 60 -99 SPO 1997 04 04 11 12 64 3.6 -9 687.00 -66.1 -63.0 -66.3 60 -99 SPO 1997 04 04 11 13 69 3.4 -9 687.00 -66.1 -63.0 -66.3 60 -99 SPO 1997 04 04 11 14 73 2.8 -9 687.10 -66.1 -63.0 -66.3 61 -99 SPO 1997 04 04 11 15 78 2.2 -9 687.20 -66.1 -63.1 -66.4 61 -99 SPO 1997 04 04 11 16 82 1.9 -9 687.20 -66.1 -63.4 -66.4 61 -99 SPO 1997 04 04 11 17 75 1.8 -9 687.20 -66.1 -63.6 -66.4 61 -99 SPO 1997 04 04 11 18 74 2.0 -9 687.20 -66.2 -63.8 -66.4 61 -99 SPO 1997 04 04 11 19 74 2.0 -9 687.20 -66.2 -63.8 -66.4 61 -99 SPO 1997 04 04 11 20 70 1.6 -9 687.20 -66.2 -64.0 -66.5 61 -99 SPO 1997 04 04 11 21 68 1.5 -9 687.20 -66.2 -64.3 -66.5 61 -99 SPO 1997 04 04 11 22 61 1.7 -9 687.20 -66.3 -64.5 -66.5 61 -99 SPO 1997 04 04 11 23 55 1.9 -9 687.20 -66.4 -64.6 -66.5 61 -99 SPO 1997 04 04 11 24 54 1.9 -9 687.20 -66.4 -64.6 -66.5 60 -99 SPO 1997 04 04 11 25 56 2.0 -9 687.20 -66.4 -64.6 -66.5 60 -99 SPO 1997 04 04 11 26 52 2.1 -9 687.20 -66.3 -64.6 -66.5 60 -99 SPO 1997 04 04 11 27 55 2.2 -9 687.20 -66.3 -64.6 -66.4 60 -99 SPO 1997 04 04 11 28 63 3.0 -9 687.20 -66.3 -64.3 -66.4 61 -99 SPO 1997 04 04 11 29 68 3.4 -9 687.20 -66.2 -63.7 -66.4 60 -99 SPO 1997 04 04 11 30 69 3.4 -9 687.20 -66.2 -63.4 -66.3 60 -99 SPO 1997 04 04 11 31 70 3.0 -9 687.20 -66.2 -63.4 -66.3 61 -99 SPO 1997 04 04 11 32 64 2.0 -9 687.20 -66.2 -63.6 -66.4 61 -99 SPO 1997 04 04 11 33 63 1.9 -9 687.20 -66.2 -63.8 -66.4 61 -99 SPO 1997 04 04 11 34 54 1.2 -9 687.30 -66.2 -64.2 -66.4 60 -99 SPO 1997 04 04 11 35 61 1.1 -9 687.30 -66.3 -64.5 -66.4 60 -99 SPO 1997 04 04 11 36 65 1.4 -9 687.30 -66.2 -64.7 -66.4 60 -99 SPO 1997 04 04 11 37 65 1.7 -9 687.20 -66.2 -64.6 -66.4 60 -99 SPO 1997 04 04 11 38 70 2.1 -9 687.30 -66.2 -64.4 -66.4 60 -99 SPO 1997 04 04 11 39 76 2.1 -9 687.20 -66.2 -64.2 -66.4 60 -99 SPO 1997 04 04 11 40 79 1.9 -9 687.30 -66.2 -64.3 -66.4 60 -99 SPO 1997 04 04 11 41 71 2.2 -9 687.20 -66.2 -64.5 -66.4 60 -99 SPO 1997 04 04 11 42 73 2.4 -9 687.20 -66.2 -64.3 -66.4 60 -99 SPO 1997 04 04 11 43 73 2.5 -9 687.20 -66.2 -64.0 -66.4 60 -99 SPO 1997 04 04 11 44 73 2.4 -9 687.20 -66.2 -63.9 -66.4 60 -99 SPO 1997 04 04 11 45 74 2.8 -9 687.20 -66.2 -63.7 -66.4 60 -99 SPO 1997 04 04 11 46 71 2.8 -9 687.20 -66.3 -63.6 -66.4 61 -99 SPO 1997 04 04 11 47 72 2.8 -9 687.20 -66.3 -63.4 -66.5 60 -99 SPO 1997 04 04 11 48 77 2.6 -9 687.20 -66.4 -63.4 -66.6 60 -99 SPO 1997 04 04 11 49 80 2.5 -9 687.30 -66.5 -63.4 -66.6 60 -99 SPO 1997 04 04 11 50 80 2.6 -9 687.30 -66.6 -63.4 -66.7 60 -99 SPO 1997 04 04 11 51 84 2.7 -9 687.30 -66.7 -63.3 -66.7 60 -99 SPO 1997 04 04 11 52 87 2.3 -9 687.30 -66.7 -63.1 -66.8 60 -99 SPO 1997 04 04 11 53 90 1.9 -9 687.40 -66.8 -63.2 -66.8 60 -99 SPO 1997 04 04 11 54 94 1.7 -9 687.40 -66.9 -63.4 -66.9 59 -99 SPO 1997 04 04 11 55 113 0.9 -9 687.40 -67.0 -63.7 -66.9 60 -99 SPO 1997 04 04 11 56 153 0.6 -9 687.50 -67.2 -64.4 -67.1 60 -99 SPO 1997 04 04 11 57 155 0.6 -9 687.50 -67.3 -64.7 -67.2 59 -99 SPO 1997 04 04 11 58 118 1.0 -9 687.50 -67.2 -64.4 -67.1 57 -99 SPO 1997 04 04 11 59 111 1.2 -9 687.50 -67.2 -64.0 -67.1 57 -99 SPO 1997 04 04 12 00 100 1.4 -9 687.50 -67.2 -63.8 -67.1 58 0 SPO 1997 04 04 12 01 96 1.7 -9 687.50 -67.1 -63.5 -67.1 56 -99 SPO 1997 04 04 12 02 105 1.0 -9 687.50 -67.1 -63.4 -67.1 56 -99 SPO 1997 04 04 12 03 138 0.3 -9 687.60 -67.2 -63.8 -67.1 56 -99 SPO 1997 04 04 12 04 102 1.3 -9 687.60 -67.4 -63.9 -67.2 57 -99 SPO 1997 04 04 12 05 94 1.9 -9 687.50 -67.3 -63.6 -67.2 56 -99 SPO 1997 04 04 12 06 87 1.9 -9 687.40 -67.3 -63.2 -67.2 56 -99 SPO 1997 04 04 12 07 79 1.6 -9 687.40 -67.3 -63.2 -67.2 56 -99 SPO 1997 04 04 12 08 73 1.8 -9 687.40 -67.3 -63.3 -67.2 56 -99 SPO 1997 04 04 12 09 75 2.3 -9 687.40 -67.3 -63.3 -67.2 56 -99 SPO 1997 04 04 12 10 77 2.1 -9 687.40 -67.3 -63.2 -67.3 56 -99 SPO 1997 04 04 12 11 84 2.1 -9 687.40 -67.3 -63.2 -67.3 56 -99 SPO 1997 04 04 12 12 87 2.1 -9 687.40 -67.3 -63.2 -67.3 56 -99 SPO 1997 04 04 12 13 84 1.8 -9 687.50 -67.3 -63.3 -67.3 56 -99 SPO 1997 04 04 12 14 85 1.7 -9 687.50 -67.3 -63.5 -67.3 57 -99 SPO 1997 04 04 12 15 94 1.6 -9 687.50 -67.3 -63.6 -67.3 57 -99 SPO 1997 04 04 12 16 97 1.8 -9 687.40 -67.2 -63.6 -67.3 56 -99 SPO 1997 04 04 12 17 98 2.1 -9 687.40 -67.2 -63.5 -67.3 57 -99 SPO 1997 04 04 12 18 108 1.8 -9 687.50 -67.1 -63.6 -67.2 57 -99 SPO 1997 04 04 12 19 129 1.5 -9 687.60 -67.1 -64.0 -67.2 58 -99 SPO 1997 04 04 12 20 129 1.5 -9 687.60 -67.0 -64.1 -67.2 58 -99 SPO 1997 04 04 12 21 114 1.6 -9 687.60 -66.9 -64.0 -67.1 58 -99 SPO 1997 04 04 12 22 119 1.5 -9 687.60 -66.8 -63.8 -67.1 58 -99 SPO 1997 04 04 12 23 140 1.1 -9 687.60 -66.8 -63.9 -67.0 58 -99 SPO 1997 04 04 12 24 133 0.7 -9 687.70 -67.0 -64.3 -67.3 60 -99 SPO 1997 04 04 12 25 113 1.1 -9 687.70 -67.3 -64.2 -67.4 60 -99 SPO 1997 04 04 12 26 109 1.4 -9 687.70 -67.2 -64.0 -67.4 58 -99 SPO 1997 04 04 12 27 111 1.3 -9 687.70 -67.2 -63.9 -67.3 58 -99 SPO 1997 04 04 12 28 110 1.1 -9 687.70 -67.2 -64.0 -67.3 58 -99 SPO 1997 04 04 12 29 94 1.1 -9 687.70 -67.3 -64.1 -67.3 58 -99 SPO 1997 04 04 12 30 101 1.2 -9 687.70 -67.1 -64.1 -67.2 56 -99 SPO 1997 04 04 12 31 104 1.4 -9 687.70 -66.8 -64.2 -67.1 55 -99 SPO 1997 04 04 12 32 96 1.7 -9 687.70 -66.8 -64.2 -67.0 56 -99 SPO 1997 04 04 12 33 96 1.9 -9 687.70 -66.5 -64.0 -66.8 56 -99 SPO 1997 04 04 12 34 97 1.8 -9 687.70 -66.5 -63.8 -66.8 58 -99 SPO 1997 04 04 12 35 91 1.7 -9 687.70 -66.6 -63.8 -66.9 58 -99 SPO 1997 04 04 12 36 84 2.0 -9 687.60 -66.8 -63.8 -67.0 59 -99 SPO 1997 04 04 12 37 79 2.5 -9 687.60 -67.0 -63.6 -67.1 60 -99 SPO 1997 04 04 12 38 73 2.7 -9 687.60 -67.0 -63.6 -67.1 59 -99 SPO 1997 04 04 12 39 70 2.8 -9 687.60 -67.0 -63.5 -67.1 58 -99 SPO 1997 04 04 12 40 71 2.9 -9 687.60 -67.1 -63.5 -67.1 59 -99 SPO 1997 04 04 12 41 70 2.8 -9 687.60 -67.2 -63.5 -67.2 58 -99 SPO 1997 04 04 12 42 68 2.7 -9 687.60 -67.2 -63.6 -67.2 57 -99 SPO 1997 04 04 12 43 67 2.8 -9 687.60 -67.4 -63.6 -67.3 58 -99 SPO 1997 04 04 12 44 68 3.0 -9 687.60 -67.4 -63.5 -67.3 57 -99 SPO 1997 04 04 12 45 71 3.3 -9 687.60 -67.3 -63.3 -67.2 56 -99 SPO 1997 04 04 12 46 73 3.1 -9 687.60 -67.3 -63.3 -67.2 56 -99 SPO 1997 04 04 12 47 73 2.8 -9 687.60 -67.3 -63.5 -67.2 56 -99 SPO 1997 04 04 12 48 77 2.7 -9 687.60 -67.4 -63.6 -67.3 56 -99 SPO 1997 04 04 12 49 79 2.8 -9 687.60 -67.4 -63.6 -67.4 56 -99 SPO 1997 04 04 12 50 79 2.5 -9 687.70 -67.5 -63.6 -67.4 57 -99 SPO 1997 04 04 12 51 78 2.5 -9 687.70 -67.4 -63.7 -67.4 56 -99 SPO 1997 04 04 12 52 74 2.6 -9 687.80 -67.4 -63.5 -67.4 56 -99 SPO 1997 04 04 12 53 77 2.7 -9 687.80 -67.3 -63.3 -67.4 56 -99 SPO 1997 04 04 12 54 82 2.9 -9 687.80 -67.2 -63.2 -67.4 56 -99 SPO 1997 04 04 12 55 84 3.0 -9 687.80 -67.2 -63.0 -67.3 58 -99 SPO 1997 04 04 12 56 84 3.0 -9 687.80 -67.2 -63.0 -67.3 58 -99 SPO 1997 04 04 12 57 84 3.1 -9 687.80 -67.2 -62.9 -67.3 58 -99 SPO 1997 04 04 12 58 84 2.9 -9 687.90 -67.2 -62.8 -67.3 58 -99 SPO 1997 04 04 12 59 85 3.0 -9 687.90 -67.2 -62.8 -67.3 57 -99 SPO 1997 04 04 13 00 85 3.0 -9 687.90 -67.2 -62.8 -67.3 56 0 SPO 1997 04 04 13 01 84 3.3 -9 687.90 -67.2 -62.8 -67.3 56 -99 SPO 1997 04 04 13 02 79 3.4 -9 687.90 -67.2 -62.8 -67.3 57 -99 SPO 1997 04 04 13 03 78 3.3 -9 687.90 -67.1 -62.8 -67.2 56 -99 SPO 1997 04 04 13 04 79 3.4 -9 687.90 -67.1 -62.8 -67.2 56 -99 SPO 1997 04 04 13 05 76 3.6 -9 687.90 -67.1 -62.8 -67.2 56 -99 SPO 1997 04 04 13 06 76 3.8 -9 687.90 -67.1 -62.8 -67.2 57 -99 SPO 1997 04 04 13 07 76 3.8 -9 687.90 -67.1 -62.8 -67.2 57 -99 SPO 1997 04 04 13 08 76 3.8 -9 687.90 -67.2 -62.8 -67.3 58 -99 SPO 1997 04 04 13 09 79 3.7 -9 687.90 -67.3 -62.7 -67.4 57 -99 SPO 1997 04 04 13 10 82 3.3 -9 688.00 -67.3 -62.6 -67.4 57 -99 SPO 1997 04 04 13 11 84 3.0 -9 688.00 -67.3 -62.6 -67.4 58 -99 SPO 1997 04 04 13 12 84 3.1 -9 688.10 -67.2 -62.7 -67.3 57 -99 SPO 1997 04 04 13 13 85 2.8 -9 688.10 -67.2 -62.8 -67.2 57 -99 SPO 1997 04 04 13 14 87 2.7 -9 688.10 -67.1 -62.9 -67.2 56 -99 SPO 1997 04 04 13 15 87 2.7 -9 688.10 -67.0 -62.9 -67.2 56 -99 SPO 1997 04 04 13 16 83 3.0 -9 688.10 -67.0 -62.9 -67.1 57 -99 SPO 1997 04 04 13 17 81 3.1 -9 688.10 -66.9 -62.9 -67.1 57 -99 SPO 1997 04 04 13 18 80 3.1 -9 688.10 -66.9 -62.8 -67.0 58 -99 SPO 1997 04 04 13 19 80 3.3 -9 688.10 -66.9 -62.8 -67.0 59 -99 SPO 1997 04 04 13 20 80 3.2 -9 688.10 -66.8 -62.7 -66.9 59 -99 SPO 1997 04 04 13 21 80 3.1 -9 688.10 -66.8 -62.7 -66.9 59 -99 SPO 1997 04 04 13 22 83 3.1 -9 688.10 -66.9 -62.7 -67.0 60 -99 SPO 1997 04 04 13 23 81 3.0 -9 688.10 -67.0 -62.7 -67.1 60 -99 SPO 1997 04 04 13 24 81 3.1 -9 688.10 -67.1 -62.7 -67.1 59 -99 SPO 1997 04 04 13 25 83 2.9 -9 688.20 -67.2 -62.7 -67.2 59 -99 SPO 1997 04 04 13 26 86 2.9 -9 688.20 -67.2 -62.7 -67.2 58 -99 SPO 1997 04 04 13 27 86 3.1 -9 688.20 -67.3 -62.6 -67.2 58 -99 SPO 1997 04 04 13 28 83 3.2 -9 688.20 -67.3 -62.6 -67.2 57 -99 SPO 1997 04 04 13 29 82 3.2 -9 688.20 -67.3 -62.6 -67.2 56 -99 SPO 1997 04 04 13 30 80 3.2 -9 688.20 -67.3 -62.7 -67.2 56 -99 SPO 1997 04 04 13 31 80 3.1 -9 688.20 -67.3 -62.8 -67.3 56 -99 SPO 1997 04 04 13 32 80 3.1 -9 688.20 -67.4 -62.8 -67.3 58 -99 SPO 1997 04 04 13 33 80 3.1 -9 688.20 -67.4 -63.0 -67.4 57 -99 SPO 1997 04 04 13 34 78 3.2 -9 688.20 -67.4 -63.0 -67.4 57 -99 SPO 1997 04 04 13 35 80 3.3 -9 688.20 -67.4 -63.0 -67.4 57 -99 SPO 1997 04 04 13 36 80 3.3 -9 688.20 -67.4 -62.8 -67.3 57 -99 SPO 1997 04 04 13 37 80 3.6 -9 688.20 -67.3 -62.6 -67.3 57 -99 SPO 1997 04 04 13 38 79 3.6 -9 688.20 -67.3 -62.4 -67.2 57 -99 SPO 1997 04 04 13 39 79 3.7 -9 688.20 -67.2 -62.3 -67.2 56 -99 SPO 1997 04 04 13 40 79 3.7 -9 688.20 -67.2 -62.0 -67.1 58 -99 SPO 1997 04 04 13 41 78 3.8 -9 688.20 -67.2 -62.1 -67.1 58 -99 SPO 1997 04 04 13 42 78 3.8 -9 688.20 -67.1 -62.0 -67.0 58 -99 SPO 1997 04 04 13 43 77 3.8 -9 688.20 -67.0 -62.1 -66.9 58 -99 SPO 1997 04 04 13 44 76 3.6 -9 688.20 -66.9 -62.2 -66.9 58 -99 SPO 1997 04 04 13 45 76 3.6 -9 688.20 -67.0 -62.4 -67.0 59 -99 SPO 1997 04 04 13 46 74 3.7 -9 688.20 -67.0 -62.4 -67.1 59 -99 SPO 1997 04 04 13 47 72 3.9 -9 688.20 -67.0 -62.1 -67.0 59 -99 SPO 1997 04 04 13 48 73 3.9 -9 688.20 -67.0 -61.8 -67.0 60 -99 SPO 1997 04 04 13 49 71 3.8 -9 688.20 -66.9 -61.8 -67.0 59 -99 SPO 1997 04 04 13 50 70 3.9 -9 688.20 -67.0 -61.8 -67.0 60 -99 SPO 1997 04 04 13 51 70 4.0 -9 688.20 -66.9 -61.8 -67.0 59 -99 SPO 1997 04 04 13 52 71 4.2 -9 688.10 -66.9 -61.8 -67.0 59 -99 SPO 1997 04 04 13 53 71 4.3 -9 688.10 -66.9 -61.7 -67.0 59 -99 SPO 1997 04 04 13 54 70 4.5 -9 688.10 -66.9 -61.5 -67.0 60 -99 SPO 1997 04 04 13 55 69 4.5 -9 688.10 -66.9 -61.2 -67.0 60 -99 SPO 1997 04 04 13 56 69 4.7 -9 688.10 -66.9 -61.0 -66.9 60 -99 SPO 1997 04 04 13 57 68 4.8 -9 688.10 -66.9 -60.6 -66.9 59 -99 SPO 1997 04 04 13 58 66 4.9 -9 688.10 -66.8 -60.4 -66.9 59 -99 SPO 1997 04 04 13 59 64 5.0 -9 688.10 -66.8 -60.2 -66.9 60 -99 SPO 1997 04 04 14 00 63 4.9 -9 688.10 -66.8 -60.0 -66.9 60 0 SPO 1997 04 04 14 01 63 4.8 -9 688.10 -66.8 -59.7 -66.9 60 -99 SPO 1997 04 04 14 02 64 4.9 -9 688.10 -66.8 -60.0 -66.9 60 -99 SPO 1997 04 04 14 03 64 4.9 -9 688.10 -66.8 -60.2 -66.9 60 -99 SPO 1997 04 04 14 04 64 4.8 -9 688.10 -66.8 -60.1 -66.8 61 -99 SPO 1997 04 04 14 05 63 4.7 -9 688.10 -66.7 -60.0 -66.8 60 -99 SPO 1997 04 04 14 06 63 4.8 -9 688.10 -66.7 -59.9 -66.8 60 -99 SPO 1997 04 04 14 07 63 4.8 -9 688.10 -66.7 -59.8 -66.8 60 -99 SPO 1997 04 04 14 08 63 4.8 -9 688.10 -66.7 -59.7 -66.8 60 -99 SPO 1997 04 04 14 09 64 4.8 -9 688.20 -66.7 -59.7 -66.8 60 -99 SPO 1997 04 04 14 10 64 4.7 -9 688.20 -66.7 -59.8 -66.8 60 -99 SPO 1997 04 04 14 11 64 4.8 -9 688.20 -66.7 -59.8 -66.8 60 -99 SPO 1997 04 04 14 12 64 4.9 -9 688.10 -66.7 -59.8 -66.8 60 -99 SPO 1997 04 04 14 13 63 5.0 -9 688.10 -66.7 -59.6 -66.8 60 -99 SPO 1997 04 04 14 14 63 5.0 -9 688.10 -66.7 -59.5 -66.8 60 -99 SPO 1997 04 04 14 15 63 5.2 -9 688.10 -66.7 -59.4 -66.8 60 -99 SPO 1997 04 04 14 16 61 5.2 -9 688.10 -66.7 -59.5 -66.7 61 -99 SPO 1997 04 04 14 17 61 5.1 -9 688.20 -66.7 -59.7 -66.7 61 -99 SPO 1997 04 04 14 18 62 5.1 -9 688.20 -66.6 -59.6 -66.7 60 -99 SPO 1997 04 04 14 19 62 5.1 -9 688.20 -66.6 -59.6 -66.7 60 -99 SPO 1997 04 04 14 20 62 5.2 -9 688.20 -66.6 -59.5 -66.7 61 -99 SPO 1997 04 04 14 21 62 5.3 -9 688.10 -66.6 -59.4 -66.7 61 -99 SPO 1997 04 04 14 22 62 5.4 -9 688.10 -66.5 -59.2 -66.7 60 -99 SPO 1997 04 04 14 23 62 5.5 -9 688.10 -66.6 -59.1 -66.6 61 -99 SPO 1997 04 04 14 24 62 5.5 -9 688.10 -66.5 -59.1 -66.6 60 -99 SPO 1997 04 04 14 25 61 5.5 -9 688.10 -66.5 -59.3 -66.6 60 -99 SPO 1997 04 04 14 26 61 5.4 -9 688.10 -66.5 -59.3 -66.6 60 -99 SPO 1997 04 04 14 27 62 5.4 -9 688.10 -66.5 -59.3 -66.6 60 -99 SPO 1997 04 04 14 28 63 5.3 -9 688.10 -66.4 -59.4 -66.5 60 -99 SPO 1997 04 04 14 29 64 5.2 -9 688.10 -66.4 -59.6 -66.5 61 -99 SPO 1997 04 04 14 30 63 5.1 -9 688.10 -66.4 -59.8 -66.5 61 -99 SPO 1997 04 04 14 31 63 4.8 -9 688.20 -66.4 -60.0 -66.4 61 -99 SPO 1997 04 04 14 32 64 4.7 -9 688.20 -66.3 -60.2 -66.4 61 -99 SPO 1997 04 04 14 33 63 4.6 -9 688.20 -66.3 -60.3 -66.4 61 -99 SPO 1997 04 04 14 34 63 4.6 -9 688.20 -66.2 -60.4 -66.4 61 -99 SPO 1997 04 04 14 35 63 4.6 -9 688.20 -66.2 -60.5 -66.4 61 -99 SPO 1997 04 04 14 36 63 4.8 -9 688.20 -66.2 -60.6 -66.4 61 -99 SPO 1997 04 04 14 37 62 4.9 -9 688.20 -66.2 -60.5 -66.3 61 -99 SPO 1997 04 04 14 38 63 5.0 -9 688.20 -66.2 -60.5 -66.3 61 -99 SPO 1997 04 04 14 39 64 4.9 -9 688.20 -66.2 -60.5 -66.3 60 -99 SPO 1997 04 04 14 40 64 4.8 -9 688.20 -66.2 -60.6 -66.3 60 -99 SPO 1997 04 04 14 41 64 4.9 -9 688.20 -66.2 -60.8 -66.3 60 -99 SPO 1997 04 04 14 42 64 5.1 -9 688.20 -66.2 -60.7 -66.3 60 -99 SPO 1997 04 04 14 43 64 5.1 -9 688.20 -66.2 -60.5 -66.3 60 -99 SPO 1997 04 04 14 44 64 4.8 -9 688.20 -66.3 -60.7 -66.3 61 -99 SPO 1997 04 04 14 45 64 5.0 -9 688.30 -66.3 -60.7 -66.3 61 -99 SPO 1997 04 04 14 46 64 5.0 -9 688.30 -66.2 -60.6 -66.3 61 -99 SPO 1997 04 04 14 47 63 4.8 -9 688.30 -66.2 -60.6 -66.3 61 -99 SPO 1997 04 04 14 48 63 4.8 -9 688.30 -66.2 -60.7 -66.3 61 -99 SPO 1997 04 04 14 49 64 4.9 -9 688.30 -66.2 -60.8 -66.3 61 -99 SPO 1997 04 04 14 50 65 4.9 -9 688.30 -66.2 -60.7 -66.3 61 -99 SPO 1997 04 04 14 51 66 4.8 -9 688.30 -66.2 -60.6 -66.3 61 -99 SPO 1997 04 04 14 52 66 4.9 -9 688.30 -66.2 -60.4 -66.3 61 -99 SPO 1997 04 04 14 53 66 4.8 -9 688.30 -66.2 -60.4 -66.3 61 -99 SPO 1997 04 04 14 54 66 4.8 -9 688.30 -66.2 -60.3 -66.3 61 -99 SPO 1997 04 04 14 55 66 4.6 -9 688.30 -66.2 -60.3 -66.3 61 -99 SPO 1997 04 04 14 56 66 4.5 -9 688.40 -66.2 -60.4 -66.3 61 -99 SPO 1997 04 04 14 57 67 4.6 -9 688.40 -66.2 -60.6 -66.3 60 -99 SPO 1997 04 04 14 58 67 4.8 -9 688.30 -66.2 -60.7 -66.3 60 -99 SPO 1997 04 04 14 59 66 4.8 -9 688.30 -66.3 -60.5 -66.4 61 -99 SPO 1997 04 04 15 00 67 4.8 -9 688.30 -66.3 -60.7 -66.4 61 0 SPO 1997 04 04 15 01 68 4.8 -9 688.40 -66.3 -60.7 -66.4 60 -99 SPO 1997 04 04 15 02 69 4.7 -9 688.40 -66.3 -60.7 -66.4 60 -99 SPO 1997 04 04 15 03 72 4.6 -9 688.40 -66.3 -60.8 -66.4 61 -99 SPO 1997 04 04 15 04 72 4.6 -9 688.40 -66.3 -60.7 -66.4 61 -99 SPO 1997 04 04 15 05 72 4.6 -9 688.40 -66.3 -60.8 -66.4 61 -99 SPO 1997 04 04 15 06 72 4.8 -9 688.40 -66.3 -60.8 -66.4 61 -99 SPO 1997 04 04 15 07 72 4.8 -9 688.40 -66.3 -60.8 -66.4 60 -99 SPO 1997 04 04 15 08 72 4.7 -9 688.40 -66.3 -60.9 -66.4 60 -99 SPO 1997 04 04 15 09 73 4.5 -9 688.50 -66.3 -60.9 -66.4 60 -99 SPO 1997 04 04 15 10 75 4.1 -9 688.60 -66.3 -61.0 -66.4 60 -99 SPO 1997 04 04 15 11 78 3.7 -9 688.60 -66.3 -61.3 -66.4 60 -99 SPO 1997 04 04 15 12 82 3.3 -9 688.70 -66.4 -61.8 -66.4 60 -99 SPO 1997 04 04 15 13 87 3.0 -9 688.80 -66.4 -62.1 -66.4 60 -99 SPO 1997 04 04 15 14 91 3.0 -9 688.80 -66.4 -62.4 -66.5 60 -99 SPO 1997 04 04 15 15 91 3.0 -9 688.70 -66.5 -62.5 -66.6 60 -99 SPO 1997 04 04 15 16 85 3.3 -9 688.70 -66.5 -62.5 -66.6 60 -99 SPO 1997 04 04 15 17 81 3.5 -9 688.60 -66.6 -62.5 -66.7 60 -99 SPO 1997 04 04 15 18 79 3.8 -9 688.60 -66.7 -62.4 -66.8 60 -99 SPO 1997 04 04 15 19 77 4.0 -9 688.60 -66.8 -62.2 -66.8 60 -99 SPO 1997 04 04 15 20 76 4.0 -9 688.60 -67.0 -61.8 -67.0 61 -99 SPO 1997 04 04 15 21 75 4.0 -9 688.60 -67.1 -61.6 -67.0 60 -99 SPO 1997 04 04 15 22 76 4.1 -9 688.60 -67.2 -61.5 -67.1 60 -99 SPO 1997 04 04 15 23 77 4.1 -9 688.60 -67.2 -61.5 -67.1 59 -99 SPO 1997 04 04 15 24 76 4.2 -9 688.60 -67.3 -61.5 -67.2 59 -99 SPO 1997 04 04 15 25 75 4.2 -9 688.60 -67.3 -61.2 -67.2 58 -99 SPO 1997 04 04 15 26 73 4.1 -9 688.60 -67.3 -61.0 -67.2 57 -99 SPO 1997 04 04 15 27 73 4.0 -9 688.60 -67.3 -61.2 -67.1 57 -99 SPO 1997 04 04 15 28 73 4.1 -9 688.60 -67.3 -61.2 -67.1 57 -99 SPO 1997 04 04 15 29 70 4.4 -9 688.50 -67.3 -61.2 -67.2 57 -99 SPO 1997 04 04 15 30 69 4.6 -9 688.50 -67.2 -61.0 -67.2 57 -99 SPO 1997 04 04 15 31 70 4.7 -9 688.50 -67.2 -60.8 -67.2 57 -99 SPO 1997 04 04 15 32 68 5.0 -9 688.40 -67.2 -60.2 -67.2 56 -99 SPO 1997 04 04 15 33 66 4.9 -9 688.40 -67.2 -59.9 -67.1 57 -99 SPO 1997 04 04 15 34 66 4.6 -9 688.50 -67.2 -60.0 -67.0 57 -99 SPO 1997 04 04 15 35 68 4.5 -9 688.50 -67.1 -59.9 -67.0 56 -99 SPO 1997 04 04 15 36 68 4.3 -9 688.50 -67.0 -60.2 -67.0 56 -99 SPO 1997 04 04 15 37 68 4.5 -9 688.50 -67.0 -60.3 -66.9 56 -99 SPO 1997 04 04 15 38 68 4.5 -9 688.50 -66.9 -60.4 -66.9 56 -99 SPO 1997 04 04 15 39 68 4.3 -9 688.60 -66.9 -60.6 -66.9 56 -99 SPO 1997 04 04 15 40 69 4.1 -9 688.60 -66.9 -60.7 -66.9 56 -99 SPO 1997 04 04 15 41 69 4.1 -9 688.60 -66.8 -61.0 -66.8 56 -99 SPO 1997 04 04 15 42 66 4.5 -9 688.60 -66.8 -61.0 -66.8 56 -99 SPO 1997 04 04 15 43 64 4.7 -9 688.50 -66.7 -60.8 -66.7 57 -99 SPO 1997 04 04 15 44 62 4.7 -9 688.50 -66.7 -60.8 -66.7 57 -99 SPO 1997 04 04 15 45 62 4.7 -9 688.50 -66.7 -60.6 -66.8 58 -99 SPO 1997 04 04 15 46 62 4.5 -9 688.50 -66.7 -60.4 -66.8 58 -99 SPO 1997 04 04 15 47 62 4.5 -9 688.60 -66.7 -60.2 -66.8 58 -99 SPO 1997 04 04 15 48 62 4.3 -9 688.60 -66.6 -60.0 -66.7 58 -99 SPO 1997 04 04 15 49 62 3.9 -9 688.60 -66.6 -60.2 -66.7 58 -99 SPO 1997 04 04 15 50 61 3.7 -9 688.60 -66.5 -60.4 -66.7 57 -99 SPO 1997 04 04 15 51 60 3.9 -9 688.60 -66.5 -60.6 -66.6 57 -99 SPO 1997 04 04 15 52 59 4.2 -9 688.60 -66.5 -60.1 -66.6 57 -99 SPO 1997 04 04 15 53 59 4.4 -9 688.60 -66.4 -59.8 -66.5 58 -99 SPO 1997 04 04 15 54 60 4.3 -9 688.60 -66.4 -59.7 -66.5 59 -99 SPO 1997 04 04 15 55 61 4.1 -9 688.60 -66.4 -59.8 -66.5 59 -99 SPO 1997 04 04 15 56 61 3.8 -9 688.60 -66.4 -60.3 -66.5 60 -99 SPO 1997 04 04 15 57 62 3.6 -9 688.70 -66.4 -61.0 -66.5 60 -99 SPO 1997 04 04 15 58 62 3.5 -9 688.70 -66.4 -61.2 -66.6 60 -99 SPO 1997 04 04 15 59 62 3.5 -9 688.70 -66.4 -61.4 -66.6 60 -99 SPO 1997 04 04 16 00 61 3.7 -9 688.70 -66.5 -61.5 -66.6 60 0 SPO 1997 04 04 16 01 61 3.9 -9 688.60 -66.5 -61.4 -66.6 60 -99 SPO 1997 04 04 16 02 61 3.9 -9 688.60 -66.5 -61.2 -66.6 59 -99 SPO 1997 04 04 16 03 61 4.2 -9 688.60 -66.6 -61.1 -66.7 60 -99 SPO 1997 04 04 16 04 59 4.8 -9 688.50 -66.6 -60.6 -66.7 60 -99 SPO 1997 04 04 16 05 59 5.0 -9 688.50 -66.7 -60.1 -66.7 59 -99 SPO 1997 04 04 16 06 60 5.0 -9 688.50 -66.7 -60.1 -66.7 59 -99 SPO 1997 04 04 16 07 60 4.8 -9 688.50 -66.7 -60.1 -66.7 59 -99 SPO 1997 04 04 16 08 60 4.7 -9 688.50 -66.7 -60.2 -66.8 59 -99 SPO 1997 04 04 16 09 60 4.7 -9 688.60 -66.7 -60.4 -66.7 59 -99 SPO 1997 04 04 16 10 59 4.7 -9 688.60 -66.7 -60.3 -66.7 60 -99 SPO 1997 04 04 16 11 57 4.8 -9 688.60 -66.7 -60.2 -66.7 60 -99 SPO 1997 04 04 16 12 57 4.8 -9 688.60 -66.6 -60.2 -66.7 60 -99 SPO 1997 04 04 16 13 58 4.8 -9 688.60 -66.6 -60.1 -66.7 60 -99 SPO 1997 04 04 16 14 60 4.7 -9 688.60 -66.6 -60.0 -66.7 60 -99 SPO 1997 04 04 16 15 61 4.9 -9 688.60 -66.6 -59.8 -66.7 60 -99 SPO 1997 04 04 16 16 61 4.7 -9 688.60 -66.6 -59.8 -66.7 60 -99 SPO 1997 04 04 16 17 63 4.4 -9 688.60 -66.6 -60.1 -66.7 60 -99 SPO 1997 04 04 16 18 64 4.1 -9 688.70 -66.7 -60.3 -66.7 60 -99 SPO 1997 04 04 16 19 67 3.8 -9 688.80 -66.7 -60.6 -66.8 60 -99 SPO 1997 04 04 16 20 70 3.5 -9 688.80 -66.7 -61.0 -66.7 60 -99 SPO 1997 04 04 16 21 71 3.4 -9 688.80 -66.7 -61.3 -66.8 60 -99 SPO 1997 04 04 16 22 73 3.1 -9 688.90 -66.7 -61.6 -66.8 60 -99 SPO 1997 04 04 16 23 74 2.9 -9 689.00 -66.8 -61.8 -66.8 60 -99 SPO 1997 04 04 16 24 77 3.0 -9 689.00 -66.8 -61.9 -66.8 60 -99 SPO 1997 04 04 16 25 77 3.0 -9 689.00 -66.8 -62.0 -66.9 60 -99 SPO 1997 04 04 16 26 77 3.3 -9 689.00 -66.8 -62.0 -66.9 60 -99 SPO 1997 04 04 16 27 75 3.5 -9 689.00 -66.9 -61.9 -66.9 60 -99 SPO 1997 04 04 16 28 74 3.3 -9 689.00 -66.9 -61.8 -67.0 60 -99 SPO 1997 04 04 16 29 76 3.2 -9 689.00 -67.0 -61.8 -67.0 60 -99 SPO 1997 04 04 16 30 79 3.2 -9 689.00 -67.0 -61.7 -67.0 60 -99 SPO 1997 04 04 16 31 80 3.3 -9 689.00 -67.0 -61.8 -67.0 59 -99 SPO 1997 04 04 16 32 81 3.3 -9 689.00 -67.1 -61.8 -67.1 59 -99 SPO 1997 04 04 16 33 84 3.4 -9 689.00 -67.1 -62.0 -67.1 59 -99 SPO 1997 04 04 16 34 85 3.5 -9 689.00 -67.1 -62.1 -67.1 59 -99 SPO 1997 04 04 16 35 83 3.4 -9 689.00 -67.2 -62.2 -67.1 60 -99 SPO 1997 04 04 16 36 81 3.5 -9 689.00 -67.2 -62.1 -67.2 60 -99 SPO 1997 04 04 16 37 81 3.5 -9 689.00 -67.2 -62.1 -67.2 60 -99 SPO 1997 04 04 16 38 83 3.4 -9 689.00 -67.3 -62.2 -67.2 60 -99 SPO 1997 04 04 16 39 86 3.2 -9 689.00 -67.3 -62.2 -67.2 59 -99 SPO 1997 04 04 16 40 87 3.1 -9 689.10 -67.3 -62.2 -67.2 59 -99 SPO 1997 04 04 16 41 85 3.3 -9 689.10 -67.3 -62.4 -67.2 59 -99 SPO 1997 04 04 16 42 88 2.9 -9 689.10 -67.3 -62.4 -67.3 59 -99 SPO 1997 04 04 16 43 88 2.9 -9 689.10 -67.3 -62.4 -67.3 59 -99 SPO 1997 04 04 16 44 89 2.8 -9 689.20 -67.3 -62.5 -67.3 59 -99 SPO 1997 04 04 16 45 86 2.7 -9 689.20 -67.4 -62.5 -67.3 59 -99 SPO 1997 04 04 16 46 88 2.7 -9 689.20 -67.4 -62.4 -67.3 59 -99 SPO 1997 04 04 16 47 90 2.4 -9 689.20 -67.4 -62.4 -67.3 59 -99 SPO 1997 04 04 16 48 89 2.7 -9 689.20 -67.4 -62.3 -67.3 59 -99 SPO 1997 04 04 16 49 85 2.7 -9 689.20 -67.4 -62.1 -67.3 59 -99 SPO 1997 04 04 16 50 81 2.5 -9 689.20 -67.4 -62.0 -67.3 59 -99 SPO 1997 04 04 16 51 81 2.8 -9 689.20 -67.3 -62.0 -67.3 60 -99 SPO 1997 04 04 16 52 81 2.7 -9 689.20 -67.3 -62.0 -67.2 60 -99 SPO 1997 04 04 16 53 80 2.8 -9 689.20 -67.3 -62.0 -67.2 60 -99 SPO 1997 04 04 16 54 79 2.8 -9 689.20 -67.3 -61.9 -67.2 59 -99 SPO 1997 04 04 16 55 79 2.7 -9 689.20 -67.2 -61.8 -67.2 57 -99 SPO 1997 04 04 16 56 80 2.5 -9 689.20 -67.2 -61.8 -67.2 57 -99 SPO 1997 04 04 16 57 80 2.5 -9 689.30 -67.2 -62.0 -67.2 57 -99 SPO 1997 04 04 16 58 78 2.4 -9 689.30 -67.1 -62.1 -67.2 56 -99 SPO 1997 04 04 16 59 73 2.5 -9 689.20 -67.1 -62.2 -67.2 57 -99 SPO 1997 04 04 17 00 70 2.6 -9 689.20 -67.1 -61.9 -67.1 57 0 SPO 1997 04 04 17 01 69 2.8 -9 689.20 -67.1 -61.8 -67.1 59 -99 SPO 1997 04 04 17 02 65 2.9 -9 689.20 -67.0 -61.6 -67.1 58 -99 SPO 1997 04 04 17 03 63 3.0 -9 689.10 -67.0 -61.5 -67.1 58 -99 SPO 1997 04 04 17 04 60 3.1 -9 689.10 -67.0 -61.5 -67.1 58 -99 SPO 1997 04 04 17 05 59 3.1 -9 689.10 -67.0 -61.5 -67.1 59 -99 SPO 1997 04 04 17 06 59 3.2 -9 689.00 -67.0 -61.4 -67.1 59 -99 SPO 1997 04 04 17 07 58 3.3 -9 689.00 -67.0 -61.5 -67.1 59 -99 SPO 1997 04 04 17 08 59 3.5 -9 689.00 -67.0 -61.3 -67.1 60 -99 SPO 1997 04 04 17 09 60 3.7 -9 689.00 -67.0 -61.0 -67.1 60 -99 SPO 1997 04 04 17 10 60 3.9 -9 689.00 -67.0 -60.6 -67.0 60 -99 SPO 1997 04 04 17 11 60 4.2 -9 689.00 -66.9 -60.3 -67.0 60 -99 SPO 1997 04 04 17 12 59 4.2 -9 689.00 -66.9 -60.0 -66.9 60 -99 SPO 1997 04 04 17 13 59 4.2 -9 689.00 -66.8 -59.8 -66.9 60 -99 SPO 1997 04 04 17 14 59 3.9 -9 689.00 -66.8 -59.8 -66.8 60 -99 SPO 1997 04 04 17 15 58 3.9 -9 689.00 -66.7 -59.8 -66.7 60 -99 SPO 1997 04 04 17 16 58 3.9 -9 689.00 -66.6 -59.7 -66.7 60 -99 SPO 1997 04 04 17 17 58 3.9 -9 689.10 -66.5 -59.5 -66.6 60 -99 SPO 1997 04 04 17 18 57 3.8 -9 689.10 -66.4 -59.1 -66.5 60 -99 SPO 1997 04 04 17 19 55 3.7 -9 689.20 -66.4 -59.0 -66.5 61 -99 SPO 1997 04 04 17 20 54 3.6 -9 689.20 -66.3 -58.8 -66.4 61 -99 SPO 1997 04 04 17 21 52 3.6 -9 689.20 -66.3 -58.5 -66.4 61 -99 SPO 1997 04 04 17 22 51 3.6 -9 689.20 -66.2 -58.5 -66.4 61 -99 SPO 1997 04 04 17 23 51 3.5 -9 689.30 -66.2 -58.5 -66.4 61 -99 SPO 1997 04 04 17 24 51 3.5 -9 689.30 -66.2 -58.7 -66.4 61 -99 SPO 1997 04 04 17 25 53 3.6 -9 689.30 -66.2 -58.8 -66.4 61 -99 SPO 1997 04 04 17 26 53 3.5 -9 689.30 -66.2 -58.7 -66.4 62 -99 SPO 1997 04 04 17 27 54 3.5 -9 689.40 -66.2 -58.6 -66.4 62 -99 SPO 1997 04 04 17 28 53 3.5 -9 689.30 -66.2 -58.9 -66.4 61 -99 SPO 1997 04 04 17 29 55 3.7 -9 689.30 -66.2 -58.8 -66.4 62 -99 SPO 1997 04 04 17 30 57 3.6 -9 689.40 -66.2 -58.5 -66.4 61 -99 SPO 1997 04 04 17 31 58 3.4 -9 689.40 -66.2 -58.9 -66.4 61 -99 SPO 1997 04 04 17 32 60 3.2 -9 689.40 -66.2 -59.4 -66.4 62 -99 SPO 1997 04 04 17 33 62 3.2 -9 689.40 -66.2 -60.0 -66.4 63 -99 SPO 1997 04 04 17 34 64 3.5 -9 689.40 -66.2 -60.3 -66.4 63 -99 SPO 1997 04 04 17 35 66 3.7 -9 689.40 -66.2 -60.1 -66.4 62 -99 SPO 1997 04 04 17 36 65 3.3 -9 689.40 -66.3 -60.3 -66.4 62 -99 SPO 1997 04 04 17 37 67 3.4 -9 689.40 -66.3 -60.5 -66.4 62 -99 SPO 1997 04 04 17 38 69 3.3 -9 689.40 -66.3 -60.5 -66.4 61 -99 SPO 1997 04 04 17 39 70 3.2 -9 689.40 -66.3 -60.7 -66.4 61 -99 SPO 1997 04 04 17 40 71 3.1 -9 689.40 -66.3 -60.8 -66.4 61 -99 SPO 1997 04 04 17 41 72 3.0 -9 689.50 -66.3 -61.1 -66.4 61 -99 SPO 1997 04 04 17 42 73 2.5 -9 689.60 -66.3 -61.2 -66.4 61 -99 SPO 1997 04 04 17 43 72 2.7 -9 689.60 -66.3 -61.3 -66.4 61 -99 SPO 1997 04 04 17 44 69 2.4 -9 689.70 -66.2 -61.2 -66.3 61 -99 SPO 1997 04 04 17 45 72 2.8 -9 689.70 -66.2 -61.3 -66.3 61 -99 SPO 1997 04 04 17 46 71 3.1 -9 689.70 -66.2 -60.9 -66.3 61 -99 SPO 1997 04 04 17 47 71 3.1 -9 689.60 -66.2 -61.1 -66.3 61 -99 SPO 1997 04 04 17 48 71 3.2 -9 689.60 -66.2 -61.5 -66.3 61 -99 SPO 1997 04 04 17 49 69 3.5 -9 689.50 -66.2 -61.5 -66.2 61 -99 SPO 1997 04 04 17 50 68 3.8 -9 689.50 -66.2 -61.5 -66.2 61 -99 SPO 1997 04 04 17 51 67 4.0 -9 689.40 -66.2 -61.2 -66.3 61 -99 SPO 1997 04 04 17 52 65 4.3 -9 689.40 -66.2 -61.0 -66.3 61 -99 SPO 1997 04 04 17 53 63 4.3 -9 689.40 -66.2 -60.7 -66.3 61 -99 SPO 1997 04 04 17 54 63 4.3 -9 689.40 -66.2 -60.8 -66.3 61 -99 SPO 1997 04 04 17 55 64 4.2 -9 689.40 -66.2 -60.9 -66.3 61 -99 SPO 1997 04 04 17 56 66 4.0 -9 689.40 -66.2 -61.0 -66.2 61 -99 SPO 1997 04 04 17 57 66 4.0 -9 689.50 -66.1 -60.9 -66.2 61 -99 SPO 1997 04 04 17 58 67 4.0 -9 689.50 -66.1 -60.9 -66.2 61 -99 SPO 1997 04 04 17 59 66 4.2 -9 689.40 -66.1 -60.2 -66.1 61 -99 SPO 1997 04 04 18 00 65 4.3 -9 689.40 -66.0 -60.3 -66.1 61 0 SPO 1997 04 04 18 01 64 4.4 -9 689.40 -66.0 -60.4 -66.1 60 -99 SPO 1997 04 04 18 02 64 4.2 -9 689.40 -66.0 -60.5 -66.1 61 -99 SPO 1997 04 04 18 03 63 3.8 -9 689.40 -66.0 -60.8 -66.1 61 -99 SPO 1997 04 04 18 04 62 3.7 -9 689.50 -66.0 -60.8 -66.1 61 -99 SPO 1997 04 04 18 05 61 3.8 -9 689.50 -66.0 -60.7 -66.1 62 -99 SPO 1997 04 04 18 06 59 3.9 -9 689.50 -66.0 -60.6 -66.0 62 -99 SPO 1997 04 04 18 07 57 3.9 -9 689.50 -65.9 -60.3 -66.0 61 -99 SPO 1997 04 04 18 08 56 3.7 -9 689.50 -65.8 -60.4 -65.9 61 -99 SPO 1997 04 04 18 09 56 3.6 -9 689.60 -65.8 -60.2 -65.9 61 -99 SPO 1997 04 04 18 10 54 3.7 -9 689.60 -65.8 -60.0 -65.9 61 -99 SPO 1997 04 04 18 11 53 4.0 -9 689.60 -65.8 -59.6 -65.9 61 -99 SPO 1997 04 04 18 12 52 4.5 -9 689.50 -65.8 -59.5 -65.9 61 -99 SPO 1997 04 04 18 13 52 4.9 -9 689.40 -65.7 -59.3 -65.8 60 -99 SPO 1997 04 04 18 14 51 5.0 -9 689.40 -65.7 -58.8 -65.8 61 -99 SPO 1997 04 04 18 15 52 5.1 -9 689.40 -65.7 -58.3 -65.8 61 -99 SPO 1997 04 04 18 16 51 5.1 -9 689.40 -65.7 -58.2 -65.8 62 -99 SPO 1997 04 04 18 17 50 5.2 -9 689.40 -65.7 -58.2 -65.8 63 -99 SPO 1997 04 04 18 18 50 5.2 -9 689.40 -65.6 -58.2 -65.7 62 -99 SPO 1997 04 04 18 19 49 5.2 -9 689.40 -65.6 -58.2 -65.6 63 -99 SPO 1997 04 04 18 20 49 5.2 -9 689.40 -65.5 -58.0 -65.6 63 -99 SPO 1997 04 04 18 21 49 5.1 -9 689.40 -65.5 -57.8 -65.5 63 -99 SPO 1997 04 04 18 22 49 5.1 -9 689.40 -65.4 -57.7 -65.5 62 -99 SPO 1997 04 04 18 23 48 4.8 -9 689.50 -65.4 -57.7 -65.5 62 -99 SPO 1997 04 04 18 24 47 4.5 -9 689.50 -65.4 -57.8 -65.5 62 -99 SPO 1997 04 04 18 25 48 4.7 -9 689.60 -65.3 -58.0 -65.4 61 -99 SPO 1997 04 04 18 26 48 4.7 -9 689.50 -65.3 -57.8 -65.4 62 -99 SPO 1997 04 04 18 27 48 4.8 -9 689.60 -65.3 -57.6 -65.4 62 -99 SPO 1997 04 04 18 28 47 4.6 -9 689.60 -65.3 -57.7 -65.4 62 -99 SPO 1997 04 04 18 29 47 4.7 -9 689.60 -65.2 -57.5 -65.3 62 -99 SPO 1997 04 04 18 30 47 4.7 -9 689.60 -65.2 -57.5 -65.3 62 -99 SPO 1997 04 04 18 31 46 4.8 -9 689.60 -65.2 -57.5 -65.3 62 -99 SPO 1997 04 04 18 32 45 4.8 -9 689.60 -65.2 -57.7 -65.4 63 -99 SPO 1997 04 04 18 33 43 4.8 -9 689.60 -65.2 -57.8 -65.4 63 -99 SPO 1997 04 04 18 34 43 4.7 -9 689.60 -65.2 -57.8 -65.3 62 -99 SPO 1997 04 04 18 35 41 4.7 -9 689.60 -65.2 -57.7 -65.3 62 -99 SPO 1997 04 04 18 36 41 4.5 -9 689.60 -65.2 -57.7 -65.3 62 -99 SPO 1997 04 04 18 37 41 4.5 -9 689.60 -65.2 -57.8 -65.2 62 -99 SPO 1997 04 04 18 38 42 4.3 -9 689.60 -65.1 -58.0 -65.2 62 -99 SPO 1997 04 04 18 39 44 4.1 -9 689.60 -65.1 -57.8 -65.2 62 -99 SPO 1997 04 04 18 40 44 4.2 -9 689.60 -65.1 -57.8 -65.3 62 -99 SPO 1997 04 04 18 41 45 4.2 -9 689.60 -65.2 -57.6 -65.3 62 -99 SPO 1997 04 04 18 42 45 4.2 -9 689.60 -65.2 -57.6 -65.4 62 -99 SPO 1997 04 04 18 43 44 4.4 -9 689.60 -65.3 -57.5 -65.4 63 -99 SPO 1997 04 04 18 44 42 4.4 -9 689.60 -65.3 -57.5 -65.4 64 -99 SPO 1997 04 04 18 45 43 4.3 -9 689.60 -65.3 -57.6 -65.4 62 -99 SPO 1997 04 04 18 46 43 4.2 -9 689.70 -65.3 -57.8 -65.4 62 -99 SPO 1997 04 04 18 47 43 4.1 -9 689.70 -65.3 -58.0 -65.4 62 -99 SPO 1997 04 04 18 48 43 4.2 -9 689.70 -65.3 -58.0 -65.4 62 -99 SPO 1997 04 04 18 49 44 4.0 -9 689.70 -65.4 -58.0 -65.4 62 -99 SPO 1997 04 04 18 50 42 3.8 -9 689.70 -65.4 -58.1 -65.4 62 -99 SPO 1997 04 04 18 51 42 3.6 -9 689.80 -65.4 -58.3 -65.4 63 -99 SPO 1997 04 04 18 52 43 3.8 -9 689.80 -65.4 -58.2 -65.5 -99 -99 SPO 1997 04 04 18 53 41 4.0 -9 689.70 -65.4 -58.2 -65.5 -99 -99 SPO 1997 04 04 18 54 40 4.1 -9 689.70 -65.4 -58.2 -65.5 -99 -99 SPO 1997 04 04 18 55 41 4.2 -9 689.70 -65.4 -58.0 -65.5 -99 -99 SPO 1997 04 04 18 56 40 4.2 -9 689.70 -65.4 -58.0 -65.5 -99 -99 SPO 1997 04 04 18 57 39 4.3 -9 689.70 -65.5 -57.9 -65.5 62 -99 SPO 1997 04 04 18 58 38 4.3 -9 689.70 -65.4 -57.8 -65.4 62 -99 SPO 1997 04 04 18 59 39 4.3 -9 689.70 -65.4 -57.9 -65.4 61 -99 SPO 1997 04 04 19 00 39 4.4 -9 689.70 -65.3 -57.9 -65.3 61 0 SPO 1997 04 04 19 01 41 4.6 -9 689.70 -65.2 -58.0 -65.2 61 -99 SPO 1997 04 04 19 02 42 4.8 -9 689.60 -65.2 -58.0 -65.2 62 -99 SPO 1997 04 04 19 03 42 4.9 -9 689.60 -65.1 -58.0 -65.2 62 -99 SPO 1997 04 04 19 04 42 5.0 -9 689.70 -65.1 -58.0 -65.2 62 -99 SPO 1997 04 04 19 05 43 5.0 -9 689.60 -65.1 -58.0 -65.1 63 -99 SPO 1997 04 04 19 06 43 4.9 -9 689.60 -65.1 -58.0 -65.1 63 -99 SPO 1997 04 04 19 07 43 4.8 -9 689.70 -65.0 -58.1 -65.1 62 -99 SPO 1997 04 04 19 08 43 4.6 -9 689.70 -65.0 -58.0 -65.0 62 -99 SPO 1997 04 04 19 09 43 4.4 -9 689.70 -64.9 -57.9 -64.9 62 -99 SPO 1997 04 04 19 10 43 4.4 -9 689.70 -64.8 -57.9 -64.9 62 -99 SPO 1997 04 04 19 11 42 4.3 -9 689.70 -64.8 -58.0 -64.8 62 -99 SPO 1997 04 04 19 12 41 3.9 -9 689.80 -64.7 -58.2 -64.8 62 -99 SPO 1997 04 04 19 13 40 3.8 -9 689.80 -64.7 -58.3 -64.8 62 -99 SPO 1997 04 04 19 14 40 3.5 -9 689.80 -64.6 -58.6 -64.7 61 -99 SPO 1997 04 04 19 15 40 3.5 -9 689.80 -64.5 -58.8 -64.6 62 -99 SPO 1997 04 04 19 16 39 3.5 -9 689.90 -64.5 -59.0 -64.5 63 -99 SPO 1997 04 04 19 17 38 3.6 -9 689.90 -64.4 -59.0 -64.5 63 -99 SPO 1997 04 04 19 18 38 3.6 -9 689.90 -64.3 -59.0 -64.4 63 -99 SPO 1997 04 04 19 19 38 3.7 -9 689.90 -64.3 -59.2 -64.4 63 -99 SPO 1997 04 04 19 20 39 3.9 -9 689.80 -64.3 -59.2 -64.4 63 -99 SPO 1997 04 04 19 21 38 4.2 -9 689.80 -64.3 -59.0 -64.4 64 -99 SPO 1997 04 04 19 22 38 4.3 -9 689.80 -64.3 -59.0 -64.4 64 -99 SPO 1997 04 04 19 23 38 4.2 -9 689.80 -64.2 -58.8 -64.4 63 -99 SPO 1997 04 04 19 24 37 4.4 -9 689.80 -64.2 -58.8 -64.3 63 -99 SPO 1997 04 04 19 25 37 4.3 -9 689.80 -64.2 -58.8 -64.2 63 -99 SPO 1997 04 04 19 26 36 4.3 -9 689.80 -64.0 -58.8 -64.0 63 -99 SPO 1997 04 04 19 27 36 4.3 -9 689.80 -63.9 -58.7 -64.0 63 -99 SPO 1997 04 04 19 28 39 4.3 -9 689.80 -63.9 -58.7 -64.0 63 -99 SPO 1997 04 04 19 29 37 4.3 -9 689.80 -63.9 -58.6 -64.0 63 -99 SPO 1997 04 04 19 30 36 4.1 -9 689.80 -63.9 -58.7 -64.1 63 -99 SPO 1997 04 04 19 31 35 4.1 -9 689.90 -63.9 -58.7 -64.0 63 -99 SPO 1997 04 04 19 32 35 4.3 -9 689.90 -63.8 -58.6 -63.8 63 -99 SPO 1997 04 04 19 33 35 4.3 -9 689.80 -63.8 -58.3 -63.8 64 -99 SPO 1997 04 04 19 34 36 4.2 -9 689.90 -63.7 -58.3 -63.9 63 -99 SPO 1997 04 04 19 35 35 4.1 -9 689.80 -63.8 -58.4 -63.9 64 -99 SPO 1997 04 04 19 36 35 4.3 -9 689.80 -63.8 -58.5 -63.8 64 -99 SPO 1997 04 04 19 37 34 4.5 -9 689.80 -63.6 -58.3 -63.7 63 -99 SPO 1997 04 04 19 38 35 4.4 -9 689.80 -63.5 -57.8 -63.4 63 -99 SPO 1997 04 04 19 39 34 4.5 -9 689.80 -63.4 -57.5 -63.4 64 -99 SPO 1997 04 04 19 40 33 4.5 -9 689.80 -63.4 -57.4 -63.5 64 -99 SPO 1997 04 04 19 41 31 4.3 -9 689.90 -63.4 -57.5 -63.5 64 -99 SPO 1997 04 04 19 42 30 4.1 -9 690.00 -63.3 -57.7 -63.4 63 -99 SPO 1997 04 04 19 43 28 4.0 -9 690.00 -63.3 -57.9 -63.4 63 -99 SPO 1997 04 04 19 44 30 3.9 -9 690.10 -63.2 -58.1 -63.4 62 -99 SPO 1997 04 04 19 45 31 3.5 -9 690.10 -63.2 -58.2 -63.3 63 -99 SPO 1997 04 04 19 46 31 3.4 -9 690.10 -63.1 -58.4 -63.3 62 -99 SPO 1997 04 04 19 47 32 3.2 -9 690.20 -63.0 -58.5 -63.2 62 -99 SPO 1997 04 04 19 48 32 3.1 -9 690.20 -63.0 -58.6 -63.2 63 -99 SPO 1997 04 04 19 49 30 3.3 -9 690.20 -63.0 -58.8 -63.2 63 -99 SPO 1997 04 04 19 50 33 3.2 -9 690.20 -63.1 -58.8 -63.3 64 -99 SPO 1997 04 04 19 51 38 3.4 -9 690.20 -63.1 -58.9 -63.3 64 -99 SPO 1997 04 04 19 52 38 3.6 -9 690.10 -63.1 -58.8 -63.2 65 -99 SPO 1997 04 04 19 53 37 3.8 -9 690.10 -63.1 -58.7 -63.3 64 -99 SPO 1997 04 04 19 54 36 4.0 -9 690.10 -63.2 -58.6 -63.4 64 -99 SPO 1997 04 04 19 55 36 4.1 -9 690.10 -63.4 -58.5 -63.5 64 -99 SPO 1997 04 04 19 56 36 3.9 -9 690.10 -63.4 -58.4 -63.5 64 -99 SPO 1997 04 04 19 57 37 3.8 -9 690.20 -63.5 -58.4 -63.6 64 -99 SPO 1997 04 04 19 58 38 3.9 -9 690.20 -63.6 -58.4 -63.7 64 -99 SPO 1997 04 04 19 59 40 3.8 -9 690.20 -63.7 -58.5 -63.8 65 -99 SPO 1997 04 04 20 00 39 3.8 -9 690.20 -63.8 -58.5 -63.9 65 0 SPO 1997 04 04 20 01 38 3.7 -9 690.20 -64.0 -58.5 -64.0 65 -99 SPO 1997 04 04 20 02 37 3.8 -9 690.20 -64.1 -58.6 -64.0 66 -99 SPO 1997 04 04 20 03 36 3.7 -9 690.20 -64.2 -58.6 -64.1 65 -99 SPO 1997 04 04 20 04 38 3.6 -9 690.20 -64.2 -58.5 -64.2 64 -99 SPO 1997 04 04 20 05 39 3.6 -9 690.20 -64.3 -58.6 -64.2 63 -99 SPO 1997 04 04 20 06 38 3.7 -9 690.20 -64.3 -58.6 -64.2 63 -99 SPO 1997 04 04 20 07 38 3.8 -9 690.20 -64.4 -58.6 -64.2 63 -99 SPO 1997 04 04 20 08 37 4.0 -9 690.20 -64.4 -58.6 -64.3 62 -99 SPO 1997 04 04 20 09 37 4.1 -9 690.10 -64.6 -58.5 -64.4 63 -99 SPO 1997 04 04 20 10 38 4.2 -9 690.10 -64.7 -58.4 -64.6 63 -99 SPO 1997 04 04 20 11 36 4.2 -9 690.10 -64.7 -58.3 -64.6 62 -99 SPO 1997 04 04 20 12 36 4.4 -9 690.10 -64.8 -58.3 -64.6 63 -99 SPO 1997 04 04 20 13 35 4.5 -9 690.10 -64.7 -58.3 -64.6 62 -99 SPO 1997 04 04 20 14 34 4.5 -9 690.10 -64.7 -58.4 -64.5 62 -99 SPO 1997 04 04 20 15 34 4.5 -9 690.10 -64.6 -58.4 -64.3 62 -99 SPO 1997 04 04 20 16 35 4.3 -9 690.20 -64.3 -58.4 -64.0 59 -99 SPO 1997 04 04 20 17 37 4.1 -9 690.20 -64.1 -58.6 -63.9 59 -99 SPO 1997 04 04 20 18 39 4.2 -9 690.20 -64.0 -58.3 -63.9 60 -99 SPO 1997 04 04 20 19 39 4.1 -9 690.20 -64.0 -58.2 -64.1 61 -99 SPO 1997 04 04 20 20 39 3.9 -9 690.20 -64.2 -58.3 -64.3 62 -99 SPO 1997 04 04 20 21 39 3.9 -9 690.20 -64.3 -58.4 -64.4 62 -99 SPO 1997 04 04 20 22 38 4.1 -9 690.20 -64.4 -58.6 -64.4 63 -99 SPO 1997 04 04 20 23 38 4.0 -9 690.20 -64.4 -58.6 -64.5 62 -99 SPO 1997 04 04 20 24 37 4.0 -9 690.20 -64.4 -58.6 -64.4 62 -99 SPO 1997 04 04 20 25 34 4.0 -9 690.20 -64.4 -58.8 -64.4 63 -99 SPO 1997 04 04 20 26 32 4.1 -9 690.20 -64.4 -59.0 -64.4 63 -99 SPO 1997 04 04 20 27 31 4.1 -9 690.20 -64.3 -59.2 -64.3 62 -99 SPO 1997 04 04 20 28 33 4.1 -9 690.20 -64.2 -59.2 -64.0 61 -99 SPO 1997 04 04 20 29 35 4.2 -9 690.20 -63.9 -59.2 -63.8 60 -99 SPO 1997 04 04 20 30 34 4.3 -9 690.20 -63.7 -59.0 -63.6 60 -99 SPO 1997 04 04 20 31 33 4.3 -9 690.20 -63.7 -58.8 -63.8 61 -99 SPO 1997 04 04 20 32 32 4.3 -9 690.20 -63.7 -58.7 -63.9 60 -99 SPO 1997 04 04 20 33 31 4.3 -9 690.30 -63.8 -58.7 -63.9 61 -99 SPO 1997 04 04 20 34 30 4.3 -9 690.30 -63.7 -58.7 -63.7 61 -99 SPO 1997 04 04 20 35 28 4.5 -9 690.30 -63.5 -58.6 -63.5 61 -99 SPO 1997 04 04 20 36 28 4.7 -9 690.20 -63.4 -58.5 -63.4 62 -99 SPO 1997 04 04 20 37 28 4.8 -9 690.20 -63.2 -58.3 -63.3 61 -99 SPO 1997 04 04 20 38 28 4.8 -9 690.20 -63.1 -58.1 -63.2 61 -99 SPO 1997 04 04 20 39 28 5.0 -9 690.20 -63.0 -58.2 -63.2 62 -99 SPO 1997 04 04 20 40 29 4.6 -9 690.30 -63.0 -58.2 -63.2 62 -99 SPO 1997 04 04 20 41 29 4.4 -9 690.30 -63.1 -58.3 -63.3 63 -99 SPO 1997 04 04 20 42 29 4.4 -9 690.30 -63.1 -58.4 -63.2 62 -99 SPO 1997 04 04 20 43 32 4.0 -9 690.40 -63.0 -58.4 -63.2 61 -99 SPO 1997 04 04 20 44 31 4.0 -9 690.40 -63.0 -58.4 -63.2 62 -99 SPO 1997 04 04 20 45 30 4.0 -9 690.40 -63.1 -58.4 -63.3 63 -99 SPO 1997 04 04 20 46 29 4.1 -9 690.40 -63.1 -58.5 -63.3 63 -99 SPO 1997 04 04 20 47 29 4.2 -9 690.40 -63.1 -58.5 -63.3 64 -99 SPO 1997 04 04 20 48 29 4.3 -9 690.40 -63.1 -58.5 -63.3 64 -99 SPO 1997 04 04 20 49 29 4.3 -9 690.40 -63.1 -58.4 -63.3 64 -99 SPO 1997 04 04 20 50 30 4.4 -9 690.40 -63.1 -58.4 -63.3 63 -99 SPO 1997 04 04 20 51 32 4.4 -9 690.30 -63.1 -58.4 -63.2 63 -99 SPO 1997 04 04 20 52 32 4.4 -9 690.30 -63.1 -58.6 -63.2 62 -99 SPO 1997 04 04 20 53 33 4.3 -9 690.30 -63.1 -58.8 -63.2 62 -99 SPO 1997 04 04 20 54 33 4.0 -9 690.40 -63.1 -58.8 -63.3 62 -99 SPO 1997 04 04 20 55 32 3.8 -9 690.40 -63.2 -58.9 -63.3 64 -99 SPO 1997 04 04 20 56 34 4.1 -9 690.40 -63.2 -58.9 -63.3 64 -99 SPO 1997 04 04 20 57 35 3.9 -9 690.40 -63.2 -59.0 -63.3 64 -99 SPO 1997 04 04 20 58 36 3.8 -9 690.40 -63.2 -59.1 -63.3 64 -99 SPO 1997 04 04 20 59 36 3.7 -9 690.40 -63.2 -59.2 -63.4 64 -99 SPO 1997 04 04 21 00 34 3.6 -9 690.50 -63.3 -59.4 -63.4 64 0 SPO 1997 04 04 21 01 33 3.6 -9 690.50 -63.4 -59.6 -63.5 64 -99 SPO 1997 04 04 21 02 32 3.7 -9 690.50 -63.4 -59.7 -63.5 62 -99 SPO 1997 04 04 21 03 31 3.7 -9 690.40 -63.4 -59.7 -63.4 62 -99 SPO 1997 04 04 21 04 32 3.7 -9 690.50 -63.3 -59.7 -63.3 61 -99 SPO 1997 04 04 21 05 32 3.8 -9 690.40 -63.2 -59.6 -63.2 61 -99 SPO 1997 04 04 21 06 32 4.0 -9 690.40 -63.2 -59.6 -63.2 62 -99 SPO 1997 04 04 21 07 32 4.1 -9 690.40 -63.2 -59.6 -63.2 63 -99 SPO 1997 04 04 21 08 31 4.2 -9 690.40 -63.1 -59.5 -63.2 62 -99 SPO 1997 04 04 21 09 33 4.1 -9 690.40 -63.2 -59.5 -63.2 63 -99 SPO 1997 04 04 21 10 33 4.1 -9 690.40 -63.2 -59.4 -63.3 64 -99 SPO 1997 04 04 21 11 33 4.1 -9 690.40 -63.3 -59.4 -63.4 64 -99 SPO 1997 04 04 21 12 34 4.2 -9 690.40 -63.3 -59.4 -63.4 63 -99 SPO 1997 04 04 21 13 35 4.1 -9 690.40 -63.4 -59.4 -63.5 63 -99 SPO 1997 04 04 21 14 35 4.0 -9 690.40 -63.4 -59.5 -63.5 62 -99 SPO 1997 04 04 21 15 34 3.9 -9 690.40 -63.5 -59.5 -63.6 62 -99 SPO 1997 04 04 21 16 32 3.9 -9 690.40 -63.6 -59.6 -63.6 63 -99 SPO 1997 04 04 21 17 30 3.8 -9 690.40 -63.6 -59.6 -63.6 63 -99 SPO 1997 04 04 21 18 29 4.0 -9 690.50 -63.6 -59.6 -63.6 62 -99 SPO 1997 04 04 21 19 29 3.9 -9 690.50 -63.6 -59.6 -63.6 62 -99 SPO 1997 04 04 21 20 31 3.8 -9 690.50 -63.5 -59.6 -63.4 62 -99 SPO 1997 04 04 21 21 34 3.8 -9 690.40 -63.4 -59.4 -63.3 62 -99 SPO 1997 04 04 21 22 34 3.9 -9 690.40 -63.3 -59.3 -63.2 63 -99 SPO 1997 04 04 21 23 34 4.0 -9 690.40 -63.3 -59.3 -63.4 63 -99 SPO 1997 04 04 21 24 34 4.0 -9 690.40 -63.4 -59.3 -63.5 63 -99 SPO 1997 04 04 21 25 35 4.0 -9 690.40 -63.4 -59.3 -63.6 62 -99 SPO 1997 04 04 21 26 36 4.0 -9 690.40 -63.6 -59.4 -63.7 63 -99 SPO 1997 04 04 21 27 36 4.1 -9 690.40 -63.7 -59.5 -63.7 61 -99 SPO 1997 04 04 21 28 36 4.2 -9 690.40 -63.7 -59.4 -63.8 61 -99 SPO 1997 04 04 21 29 36 4.3 -9 690.40 -63.8 -59.2 -63.8 62 -99 SPO 1997 04 04 21 30 34 4.3 -9 690.40 -63.8 -59.2 -63.8 63 -99 SPO 1997 04 04 21 31 34 4.1 -9 690.40 -63.8 -59.2 -63.8 63 -99 SPO 1997 04 04 21 32 35 4.1 -9 690.40 -63.8 -59.3 -63.8 64 -99 SPO 1997 04 04 21 33 37 4.0 -9 690.40 -63.9 -59.4 -63.9 64 -99 SPO 1997 04 04 21 34 39 3.8 -9 690.40 -63.9 -59.5 -63.9 63 -99 SPO 1997 04 04 21 35 40 3.7 -9 690.40 -64.1 -59.5 -64.0 63 -99 SPO 1997 04 04 21 36 39 3.6 -9 690.40 -64.4 -59.5 -64.2 63 -99 SPO 1997 04 04 21 37 38 3.7 -9 690.40 -64.6 -59.6 -64.4 63 -99 SPO 1997 04 04 21 38 37 3.9 -9 690.40 -64.8 -59.5 -64.6 62 -99 SPO 1997 04 04 21 39 37 4.0 -9 690.40 -64.9 -59.4 -64.6 61 -99 SPO 1997 04 04 21 40 36 4.0 -9 690.40 -64.9 -59.4 -64.6 61 -99 SPO 1997 04 04 21 41 36 4.0 -9 690.40 -64.8 -59.2 -64.6 60 -99 SPO 1997 04 04 21 42 37 4.0 -9 690.40 -64.8 -59.2 -64.6 61 -99 SPO 1997 04 04 21 43 38 3.8 -9 690.40 -64.8 -59.2 -64.6 61 -99 SPO 1997 04 04 21 44 39 3.5 -9 690.40 -64.8 -59.3 -64.6 62 -99 SPO 1997 04 04 21 45 40 3.2 -9 690.50 -64.8 -59.4 -64.6 62 -99 SPO 1997 04 04 21 46 40 3.2 -9 690.50 -65.0 -59.4 -64.8 63 -99 SPO 1997 04 04 21 47 40 3.2 -9 690.60 -65.1 -59.4 -64.8 62 -99 SPO 1997 04 04 21 48 39 3.4 -9 690.50 -65.2 -59.5 -64.9 62 -99 SPO 1997 04 04 21 49 38 3.3 -9 690.50 -65.2 -59.5 -64.9 61 -99 SPO 1997 04 04 21 50 38 3.3 -9 690.50 -65.2 -59.6 -65.0 60 -99 SPO 1997 04 04 21 51 38 3.4 -9 690.50 -65.2 -59.6 -65.0 59 -99 SPO 1997 04 04 21 52 39 3.4 -9 690.50 -65.2 -59.6 -65.0 60 -99 SPO 1997 04 04 21 53 41 3.2 -9 690.50 -65.2 -59.8 -65.0 61 -99 SPO 1997 04 04 21 54 45 2.9 -9 690.50 -65.2 -60.0 -65.0 60 -99 SPO 1997 04 04 21 55 45 2.8 -9 690.50 -65.3 -60.1 -65.1 61 -99 SPO 1997 04 04 21 56 44 2.9 -9 690.50 -65.3 -60.0 -65.1 60 -99 SPO 1997 04 04 21 57 41 3.1 -9 690.50 -65.3 -60.0 -65.1 59 -99 SPO 1997 04 04 21 58 39 3.4 -9 690.50 -65.3 -59.9 -65.2 58 -99 SPO 1997 04 04 21 59 37 3.5 -9 690.50 -65.3 -59.8 -65.2 58 -99 SPO 1997 04 04 22 00 36 3.7 -9 690.50 -65.3 -59.6 -65.1 58 0 SPO 1997 04 04 22 01 35 3.9 -9 690.50 -65.2 -59.5 -65.0 58 -99 SPO 1997 04 04 22 02 35 3.7 -9 690.50 -65.1 -59.5 -65.0 58 -99 SPO 1997 04 04 22 03 36 3.4 -9 690.50 -65.0 -59.8 -65.0 58 -99 SPO 1997 04 04 22 04 38 3.2 -9 690.50 -65.0 -60.0 -65.0 59 -99 SPO 1997 04 04 22 05 39 3.4 -9 690.50 -65.0 -60.0 -65.0 59 -99 SPO 1997 04 04 22 06 38 3.6 -9 690.50 -65.1 -59.9 -65.1 60 -99 SPO 1997 04 04 22 07 37 3.9 -9 690.40 -65.1 -59.9 -65.1 60 -99 SPO 1997 04 04 22 08 36 4.1 -9 690.40 -65.1 -59.7 -65.1 60 -99 SPO 1997 04 04 22 09 36 4.1 -9 690.40 -65.0 -59.5 -65.0 59 -99 SPO 1997 04 04 22 10 36 3.9 -9 690.40 -65.0 -59.4 -64.9 59 -99 SPO 1997 04 04 22 11 36 3.6 -9 690.50 -64.9 -59.4 -64.8 58 -99 SPO 1997 04 04 22 12 36 3.5 -9 690.60 -64.8 -59.3 -64.8 58 -99 SPO 1997 04 04 22 13 35 3.4 -9 690.60 -64.7 -59.2 -64.7 58 -99 SPO 1997 04 04 22 14 33 3.3 -9 690.60 -64.6 -59.4 -64.6 59 -99 SPO 1997 04 04 22 15 32 3.1 -9 690.60 -64.4 -59.7 -64.5 59 -99 SPO 1997 04 04 22 16 32 3.3 -9 690.60 -64.3 -59.7 -64.4 59 -99 SPO 1997 04 04 22 17 32 3.8 -9 690.60 -64.2 -59.6 -64.2 60 -99 SPO 1997 04 04 22 18 32 3.9 -9 690.60 -64.1 -59.4 -64.1 60 -99 SPO 1997 04 04 22 19 33 4.0 -9 690.50 -64.0 -59.4 -64.0 60 -99 SPO 1997 04 04 22 20 34 4.0 -9 690.50 -63.8 -59.3 -64.0 59 -99 SPO 1997 04 04 22 21 37 3.8 -9 690.60 -63.8 -59.4 -63.9 60 -99 SPO 1997 04 04 22 22 39 3.8 -9 690.60 -63.6 -59.5 -63.8 59 -99 SPO 1997 04 04 22 23 39 3.5 -9 690.60 -63.6 -59.6 -63.8 59 -99 SPO 1997 04 04 22 24 40 3.4 -9 690.60 -63.6 -59.7 -63.8 60 -99 SPO 1997 04 04 22 25 39 3.4 -9 690.60 -63.6 -59.8 -63.9 60 -99 SPO 1997 04 04 22 26 39 3.6 -9 690.60 -63.6 -59.7 -63.9 61 -99 SPO 1997 04 04 22 27 35 4.1 -9 690.60 -63.7 -59.4 -64.0 62 -99 SPO 1997 04 04 22 28 33 4.3 -9 690.60 -63.8 -59.0 -64.0 63 -99 SPO 1997 04 04 22 29 33 4.5 -9 690.60 -63.8 -58.7 -64.0 64 -99 SPO 1997 04 04 22 30 33 4.5 -9 690.60 -63.8 -58.6 -63.9 64 -99 SPO 1997 04 04 22 31 33 4.3 -9 690.70 -63.8 -58.8 -63.8 64 -99 SPO 1997 04 04 22 32 35 4.3 -9 690.70 -63.6 -58.7 -63.5 62 -99 SPO 1997 04 04 22 33 35 4.3 -9 690.70 -63.2 -58.7 -63.0 60 -99 SPO 1997 04 04 22 34 36 4.3 -9 690.70 -62.9 -58.6 -62.8 60 -99 SPO 1997 04 04 22 35 36 4.2 -9 690.70 -62.7 -58.6 -62.7 61 -99 SPO 1997 04 04 22 36 35 4.2 -9 690.70 -62.6 -58.5 -62.7 61 -99 SPO 1997 04 04 22 37 36 4.1 -9 690.70 -62.5 -58.5 -62.7 63 -99 SPO 1997 04 04 22 38 36 3.9 -9 690.80 -62.4 -58.6 -62.5 63 -99 SPO 1997 04 04 22 39 35 3.6 -9 690.80 -62.2 -58.7 -62.4 63 -99 SPO 1997 04 04 22 40 34 3.6 -9 690.80 -62.1 -58.8 -62.4 64 -99 SPO 1997 04 04 22 41 36 3.6 -9 690.80 -62.1 -58.8 -62.4 66 -99 SPO 1997 04 04 22 42 36 3.7 -9 690.80 -62.0 -58.9 -62.3 65 -99 SPO 1997 04 04 22 43 35 3.8 -9 690.80 -62.1 -58.8 -62.4 65 -99 SPO 1997 04 04 22 44 34 3.9 -9 690.80 -62.1 -58.8 -62.4 65 -99 SPO 1997 04 04 22 45 33 4.0 -9 690.80 -62.1 -58.7 -62.4 65 -99 SPO 1997 04 04 22 46 32 4.1 -9 690.80 -62.1 -58.8 -62.4 65 -99 SPO 1997 04 04 22 47 34 4.2 -9 690.80 -62.1 -58.8 -62.4 65 -99 SPO 1997 04 04 22 48 35 4.1 -9 690.80 -62.1 -58.8 -62.3 66 -99 SPO 1997 04 04 22 49 36 4.0 -9 690.80 -62.2 -58.8 -62.3 66 -99 SPO 1997 04 04 22 50 35 3.9 -9 690.80 -62.2 -58.8 -62.3 66 -99 SPO 1997 04 04 22 51 33 4.0 -9 690.80 -62.2 -58.8 -62.3 66 -99 SPO 1997 04 04 22 52 31 4.1 -9 690.80 -62.2 -58.8 -62.3 66 -99 SPO 1997 04 04 22 53 30 4.3 -9 690.80 -62.0 -58.6 -62.2 65 -99 SPO 1997 04 04 22 54 30 4.5 -9 690.80 -62.0 -58.4 -62.1 64 -99 SPO 1997 04 04 22 55 29 4.6 -9 690.70 -61.8 -58.3 -61.9 63 -99 SPO 1997 04 04 22 56 28 4.8 -9 690.70 -61.7 -58.1 -61.8 63 -99 SPO 1997 04 04 22 57 27 4.8 -9 690.70 -61.6 -57.8 -61.7 63 -99 SPO 1997 04 04 22 58 27 4.6 -9 690.70 -61.5 -57.7 -61.6 62 -99 SPO 1997 04 04 22 59 26 4.4 -9 690.80 -61.4 -57.7 -61.5 63 -99 SPO 1997 04 04 23 00 26 4.2 -9 690.80 -61.3 -57.8 -61.4 64 0 SPO 1997 04 04 23 01 26 4.0 -9 690.80 -61.3 -58.0 -61.4 66 -99 SPO 1997 04 04 23 02 27 4.0 -9 690.80 -61.2 -58.1 -61.4 67 -99 SPO 1997 04 04 23 03 28 4.0 -9 690.80 -61.2 -58.1 -61.3 67 -99 SPO 1997 04 04 23 04 29 3.9 -9 690.90 -61.1 -58.2 -61.3 67 -99 SPO 1997 04 04 23 05 29 3.8 -9 690.90 -61.1 -58.2 -61.2 67 -99 SPO 1997 04 04 23 06 30 3.7 -9 690.90 -61.0 -58.3 -61.2 67 -99 SPO 1997 04 04 23 07 31 3.6 -9 690.90 -61.0 -58.4 -61.1 67 -99 SPO 1997 04 04 23 08 32 3.5 -9 690.90 -60.9 -58.5 -61.1 65 -99 SPO 1997 04 04 23 09 34 3.5 -9 690.90 -60.9 -58.6 -61.1 65 -99 SPO 1997 04 04 23 10 35 3.4 -9 690.90 -60.9 -58.6 -61.2 66 -99 SPO 1997 04 04 23 11 36 3.3 -9 690.90 -61.0 -58.7 -61.1 68 -99 SPO 1997 04 04 23 12 37 3.3 -9 691.00 -61.0 -58.7 -61.2 68 -99 SPO 1997 04 04 23 13 37 3.2 -9 691.00 -61.0 -58.7 -61.3 68 -99 SPO 1997 04 04 23 14 36 3.1 -9 691.00 -61.2 -58.7 -61.4 68 -99 SPO 1997 04 04 23 15 34 3.1 -9 691.10 -61.3 -58.7 -61.5 68 -99 SPO 1997 04 04 23 16 32 3.1 -9 691.00 -61.4 -58.7 -61.6 67 -99 SPO 1997 04 04 23 17 29 3.3 -9 691.00 -61.6 -58.7 -61.8 67 -99 SPO 1997 04 04 23 18 27 3.4 -9 691.00 -61.8 -58.6 -61.9 67 -99 SPO 1997 04 04 23 19 27 3.4 -9 691.10 -62.0 -58.6 -62.0 67 -99 SPO 1997 04 04 23 20 27 3.4 -9 691.10 -62.2 -58.6 -62.1 68 -99 SPO 1997 04 04 23 21 27 3.3 -9 691.20 -62.2 -58.6 -62.1 66 -99 SPO 1997 04 04 23 22 27 3.1 -9 691.20 -62.3 -58.6 -62.1 66 -99 SPO 1997 04 04 23 23 27 3.1 -9 691.20 -62.3 -58.6 -62.1 66 -99 SPO 1997 04 04 23 24 27 3.0 -9 691.20 -62.3 -58.6 -62.1 66 -99 SPO 1997 04 04 23 25 25 3.1 -9 691.20 -62.3 -58.6 -62.0 65 -99 SPO 1997 04 04 23 26 23 3.1 -9 691.30 -62.1 -58.6 -61.8 64 -99 SPO 1997 04 04 23 27 19 3.3 -9 691.30 -61.8 -58.7 -61.6 63 -99 SPO 1997 04 04 23 28 22 3.5 -9 691.20 -61.6 -58.6 -61.4 63 -99 SPO 1997 04 04 23 29 24 3.8 -9 691.20 -61.4 -58.7 -61.2 62 -99 SPO 1997 04 04 23 30 23 4.1 -9 691.20 -61.2 -58.7 -61.2 62 -99 SPO 1997 04 04 23 31 23 4.3 -9 691.20 -61.2 -58.7 -61.0 62 -99 SPO 1997 04 04 23 32 21 4.4 -9 691.20 -60.9 -58.7 -60.8 62 -99 SPO 1997 04 04 23 33 22 4.3 -9 691.20 -60.6 -58.7 -60.4 62 -99 SPO 1997 04 04 23 34 25 4.5 -9 691.20 -60.4 -58.8 -60.2 62 -99 SPO 1997 04 04 23 35 26 4.3 -9 691.20 -60.2 -58.8 -60.2 63 -99 SPO 1997 04 04 23 36 27 4.3 -9 691.20 -60.1 -58.9 -60.3 64 -99 SPO 1997 04 04 23 37 26 4.5 -9 691.10 -60.1 -58.9 -60.3 65 -99 SPO 1997 04 04 23 38 24 4.6 -9 691.10 -60.0 -58.9 -60.2 65 -99 SPO 1997 04 04 23 39 24 4.7 -9 691.10 -60.0 -58.9 -60.2 65 -99 SPO 1997 04 04 23 40 24 4.8 -9 691.10 -59.9 -58.9 -60.1 64 -99 SPO 1997 04 04 23 41 22 4.8 -9 691.10 -59.8 -58.8 -60.0 64 -99 SPO 1997 04 04 23 42 22 4.9 -9 691.00 -59.7 -58.7 -59.8 64 -99 SPO 1997 04 04 23 43 23 4.9 -9 691.00 -59.6 -58.7 -59.8 65 -99 SPO 1997 04 04 23 44 23 5.0 -9 691.00 -59.6 -58.7 -59.8 66 -99 SPO 1997 04 04 23 45 24 5.0 -9 691.00 -59.6 -58.7 -59.8 67 -99 SPO 1997 04 04 23 46 25 5.0 -9 691.00 -59.5 -58.8 -59.7 67 -99 SPO 1997 04 04 23 47 26 4.8 -9 691.00 -59.5 -58.8 -59.7 68 -99 SPO 1997 04 04 23 48 28 4.7 -9 691.00 -59.5 -58.8 -59.6 69 -99 SPO 1997 04 04 23 49 29 4.9 -9 691.00 -59.4 -58.9 -59.6 69 -99 SPO 1997 04 04 23 50 29 4.6 -9 691.00 -59.4 -58.8 -59.5 69 -99 SPO 1997 04 04 23 51 28 4.9 -9 691.10 -59.3 -58.8 -59.4 68 -99 SPO 1997 04 04 23 52 27 4.7 -9 691.10 -59.2 -58.7 -59.3 68 -99 SPO 1997 04 04 23 53 28 4.7 -9 691.10 -59.2 -58.7 -59.2 67 -99 SPO 1997 04 04 23 54 27 4.7 -9 691.10 -59.0 -58.6 -59.2 65 -99 SPO 1997 04 04 23 55 26 4.9 -9 691.10 -59.0 -58.6 -59.0 66 -99 SPO 1997 04 04 23 56 25 4.8 -9 691.10 -58.9 -58.5 -59.0 66 -99 SPO 1997 04 04 23 57 25 5.0 -9 691.10 -58.8 -58.4 -58.9 66 -99 SPO 1997 04 04 23 58 26 5.0 -9 691.10 -58.8 -58.4 -58.8 -99 -99 SPO 1997 04 04 23 59 25 5.0 -9 691.00 -58.7 -58.4 -58.8 -99 -99 SPO 1997 04 05 00 00 25 5.1 -9 691.00 -58.7 -58.3 -58.8 -99 0 SPO 1997 04 05 00 01 25 5.1 -9 691.00 -58.6 -58.2 -58.8 -99 -99 SPO 1997 04 05 00 02 24 5.3 -9 690.90 -58.6 -58.2 -58.7 -99 -99 SPO 1997 04 05 00 03 24 5.1 -9 691.00 -58.6 -58.2 -58.7 -99 -99 SPO 1997 04 05 00 04 26 5.0 -9 691.00 -58.5 -58.1 -58.6 -99 -99 SPO 1997 04 05 00 05 27 4.9 -9 691.00 -58.5 -58.0 -58.6 -99 -99 SPO 1997 04 05 00 06 26 5.0 -9 691.00 -58.5 -57.9 -58.6 -99 -99 SPO 1997 04 05 00 07 25 4.7 -9 691.00 -58.4 -57.8 -58.5 -99 -99 SPO 1997 04 05 00 08 24 4.8 -9 691.00 -58.4 -57.8 -58.4 -99 -99 SPO 1997 04 05 00 09 22 4.7 -9 691.10 -58.3 -57.7 -58.4 -99 -99 SPO 1997 04 05 00 10 21 4.6 -9 691.10 -58.2 -57.6 -58.3 -99 -99 SPO 1997 04 05 00 11 20 4.7 -9 691.10 -58.2 -57.6 -58.3 -99 -99 SPO 1997 04 05 00 12 20 4.3 -9 691.10 -58.2 -57.6 -58.3 -99 -99 SPO 1997 04 05 00 13 20 4.3 -9 691.20 -58.2 -57.6 -58.3 68 -99 SPO 1997 04 05 00 14 20 4.0 -9 691.20 -58.2 -57.6 -58.3 68 -99 SPO 1997 04 05 00 15 21 3.9 -9 691.20 -58.2 -57.6 -58.3 68 -99 SPO 1997 04 05 00 16 20 3.6 -9 691.30 -58.2 -57.6 -58.4 68 -99 SPO 1997 04 05 00 17 21 3.7 -9 691.30 -58.2 -57.6 -58.4 67 -99 SPO 1997 04 05 00 18 20 3.7 -9 691.30 -58.2 -57.7 -58.3 68 -99 SPO 1997 04 05 00 19 21 3.7 -9 691.30 -58.2 -57.8 -58.4 69 -99 SPO 1997 04 05 00 20 20 4.0 -9 691.30 -58.3 -57.8 -58.4 71 -99 SPO 1997 04 05 00 21 19 4.0 -9 691.30 -58.3 -57.7 -58.4 71 -99 SPO 1997 04 05 00 22 17 3.9 -9 691.30 -58.3 -57.7 -58.4 71 -99 SPO 1997 04 05 00 23 16 3.8 -9 691.30 -58.3 -57.6 -58.4 70 -99 SPO 1997 04 05 00 24 15 3.9 -9 691.30 -58.3 -57.6 -58.4 69 -99 SPO 1997 04 05 00 25 14 4.2 -9 691.30 -58.3 -57.5 -58.4 68 -99 SPO 1997 04 05 00 26 15 4.3 -9 691.20 -58.4 -57.4 -58.4 68 -99 SPO 1997 04 05 00 27 18 4.5 -9 691.20 -58.4 -57.4 -58.5 66 -99 SPO 1997 04 05 00 28 19 4.6 -9 691.20 -58.4 -57.3 -58.5 66 -99 SPO 1997 04 05 00 29 19 4.7 -9 691.20 -58.5 -57.3 -58.6 66 -99 SPO 1997 04 05 00 30 22 4.5 -9 691.20 -58.5 -57.3 -58.6 66 -99 SPO 1997 04 05 00 31 23 4.6 -9 691.20 -58.6 -57.3 -58.6 67 -99 SPO 1997 04 05 00 32 25 4.7 -9 691.20 -58.6 -57.3 -58.6 67 -99 SPO 1997 04 05 00 33 26 4.7 -9 691.20 -58.6 -57.4 -58.6 67 -99 SPO 1997 04 05 00 34 27 4.7 -9 691.20 -58.6 -57.4 -58.6 67 -99 SPO 1997 04 05 00 35 27 4.6 -9 691.20 -58.6 -57.6 -58.7 67 -99 SPO 1997 04 05 00 36 27 4.9 -9 691.20 -58.7 -57.6 -58.7 67 -99 SPO 1997 04 05 00 37 26 5.0 -9 691.20 -58.7 -57.6 -58.7 66 -99 SPO 1997 04 05 00 38 25 5.0 -9 691.20 -58.7 -57.7 -58.7 65 -99 SPO 1997 04 05 00 39 25 4.9 -9 691.20 -58.7 -57.7 -58.8 65 -99 SPO 1997 04 05 00 40 23 5.0 -9 691.20 -58.8 -57.7 -58.8 65 -99 SPO 1997 04 05 00 41 21 5.0 -9 691.20 -58.8 -57.8 -58.9 65 -99 SPO 1997 04 05 00 42 20 5.0 -9 691.20 -58.8 -57.8 -58.9 65 -99 SPO 1997 04 05 00 43 19 5.1 -9 691.20 -58.9 -57.8 -58.9 66 -99 SPO 1997 04 05 00 44 18 5.1 -9 691.30 -58.9 -57.8 -58.9 66 -99 SPO 1997 04 05 00 45 18 5.0 -9 691.30 -58.9 -57.8 -59.0 66 -99 SPO 1997 04 05 00 46 18 5.0 -9 691.30 -59.0 -57.8 -59.0 67 -99 SPO 1997 04 05 00 47 19 4.8 -9 691.30 -59.0 -57.8 -59.1 66 -99 SPO 1997 04 05 00 48 20 4.7 -9 691.30 -59.1 -57.9 -59.2 65 -99 SPO 1997 04 05 00 49 20 4.6 -9 691.30 -59.2 -57.9 -59.2 65 -99 SPO 1997 04 05 00 50 22 4.7 -9 691.30 -59.2 -58.0 -59.2 65 -99 SPO 1997 04 05 00 51 23 4.4 -9 691.30 -59.3 -58.0 -59.2 65 -99 SPO 1997 04 05 00 52 25 4.4 -9 691.30 -59.3 -58.1 -59.3 65 -99 SPO 1997 04 05 00 53 27 4.5 -9 691.30 -59.3 -58.2 -59.3 65 -99 SPO 1997 04 05 00 54 29 4.3 -9 691.30 -59.4 -58.4 -59.3 65 -99 SPO 1997 04 05 00 55 31 4.3 -9 691.30 -59.4 -58.4 -59.4 65 -99 SPO 1997 04 05 00 56 32 4.2 -9 691.30 -59.4 -58.5 -59.5 65 -99 SPO 1997 04 05 00 57 32 4.3 -9 691.30 -59.5 -58.5 -59.5 66 -99 SPO 1997 04 05 00 58 31 4.4 -9 691.30 -59.5 -58.6 -59.6 65 -99 SPO 1997 04 05 00 59 29 4.4 -9 691.30 -59.6 -58.6 -59.6 65 -99 SPO 1997 04 05 01 00 27 4.6 -9 691.30 -59.6 -58.6 -59.6 64 0 SPO 1997 04 05 01 01 27 4.4 -9 691.30 -59.6 -58.5 -59.6 64 -99 SPO 1997 04 05 01 02 25 4.3 -9 691.30 -59.6 -58.5 -59.6 64 -99 SPO 1997 04 05 01 03 24 4.0 -9 691.40 -59.6 -58.6 -59.6 64 -99 SPO 1997 04 05 01 04 23 3.7 -9 691.40 -59.6 -58.6 -59.6 64 -99 SPO 1997 04 05 01 05 25 3.6 -9 691.40 -59.6 -58.7 -59.6 64 -99 SPO 1997 04 05 01 06 26 3.6 -9 691.40 -59.6 -58.8 -59.6 64 -99 SPO 1997 04 05 01 07 27 3.5 -9 691.40 -59.6 -58.9 -59.6 65 -99 SPO 1997 04 05 01 08 24 3.4 -9 691.50 -59.6 -59.0 -59.7 65 -99 SPO 1997 04 05 01 09 23 3.5 -9 691.50 -59.6 -59.0 -59.6 65 -99 SPO 1997 04 05 01 10 22 3.6 -9 691.50 -59.6 -59.0 -59.6 64 -99 SPO 1997 04 05 01 11 23 3.7 -9 691.50 -59.6 -59.0 -59.6 64 -99 SPO 1997 04 05 01 12 22 3.7 -9 691.50 -59.5 -58.9 -59.6 63 -99 SPO 1997 04 05 01 13 20 3.8 -9 691.60 -59.5 -58.9 -59.5 63 -99 SPO 1997 04 05 01 14 20 3.8 -9 691.60 -59.5 -58.9 -59.5 63 -99 SPO 1997 04 05 01 15 18 3.8 -9 691.60 -59.4 -58.8 -59.5 62 -99 SPO 1997 04 05 01 16 19 4.0 -9 691.60 -59.4 -58.8 -59.5 63 -99 SPO 1997 04 05 01 17 19 4.0 -9 691.60 -59.4 -58.7 -59.4 64 -99 SPO 1997 04 05 01 18 19 4.0 -9 691.60 -59.3 -58.7 -59.4 63 -99 SPO 1997 04 05 01 19 18 3.9 -9 691.60 -59.3 -58.6 -59.4 63 -99 SPO 1997 04 05 01 20 18 3.8 -9 691.60 -59.3 -58.6 -59.4 64 -99 SPO 1997 04 05 01 21 18 3.7 -9 691.70 -59.3 -58.7 -59.3 64 -99 SPO 1997 04 05 01 22 18 3.8 -9 691.70 -59.3 -58.7 -59.3 64 -99 SPO 1997 04 05 01 23 18 3.7 -9 691.70 -59.2 -58.7 -59.3 64 -99 SPO 1997 04 05 01 24 19 3.8 -9 691.70 -59.2 -58.6 -59.2 64 -99 SPO 1997 04 05 01 25 21 3.9 -9 691.70 -59.2 -58.6 -59.2 64 -99 SPO 1997 04 05 01 26 22 4.0 -9 691.70 -59.1 -58.6 -59.2 64 -99 SPO 1997 04 05 01 27 23 4.2 -9 691.60 -59.1 -58.5 -59.2 65 -99 SPO 1997 04 05 01 28 24 4.4 -9 691.60 -59.1 -58.4 -59.2 65 -99 SPO 1997 04 05 01 29 25 4.6 -9 691.60 -59.0 -58.4 -59.1 64 -99 SPO 1997 04 05 01 30 26 4.6 -9 691.60 -59.0 -58.3 -59.1 65 -99 SPO 1997 04 05 01 31 26 4.6 -9 691.60 -59.0 -58.4 -59.1 65 -99 SPO 1997 04 05 01 32 26 4.5 -9 691.50 -59.0 -58.4 -59.1 65 -99 SPO 1997 04 05 01 33 26 4.6 -9 691.60 -59.0 -58.3 -59.2 64 -99 SPO 1997 04 05 01 34 26 4.6 -9 691.60 -59.1 -58.3 -59.2 63 -99 SPO 1997 04 05 01 35 25 4.7 -9 691.60 -59.1 -58.3 -59.2 63 -99 SPO 1997 04 05 01 36 24 4.7 -9 691.60 -59.1 -58.3 -59.2 62 -99 SPO 1997 04 05 01 37 23 4.7 -9 691.60 -59.1 -58.3 -59.1 62 -99 SPO 1997 04 05 01 38 22 4.7 -9 691.60 -59.1 -58.3 -59.2 63 -99 SPO 1997 04 05 01 39 21 4.7 -9 691.60 -59.1 -58.2 -59.2 64 -99 SPO 1997 04 05 01 40 19 4.8 -9 691.60 -59.1 -58.1 -59.2 65 -99 SPO 1997 04 05 01 41 19 4.9 -9 691.60 -59.1 -58.0 -59.2 65 -99 SPO 1997 04 05 01 42 18 5.0 -9 691.60 -59.1 -58.0 -59.1 65 -99 SPO 1997 04 05 01 43 17 4.8 -9 691.60 -59.1 -58.0 -59.1 65 -99 SPO 1997 04 05 01 44 16 4.8 -9 691.70 -59.0 -58.1 -59.1 65 -99 SPO 1997 04 05 01 45 16 4.5 -9 691.70 -59.0 -58.1 -59.1 64 -99 SPO 1997 04 05 01 46 17 4.5 -9 691.80 -59.0 -58.2 -59.0 64 -99 SPO 1997 04 05 01 47 18 4.3 -9 691.80 -59.0 -58.2 -59.0 63 -99 SPO 1997 04 05 01 48 20 4.2 -9 691.90 -58.9 -58.3 -59.0 62 -99 SPO 1997 04 05 01 49 21 4.0 -9 691.90 -58.9 -58.3 -59.0 62 -99 SPO 1997 04 05 01 50 22 3.8 -9 691.90 -58.9 -58.3 -59.0 62 -99 SPO 1997 04 05 01 51 22 3.5 -9 691.90 -58.9 -58.4 -59.0 62 -99 SPO 1997 04 05 01 52 21 3.4 -9 692.00 -58.9 -58.5 -59.0 63 -99 SPO 1997 04 05 01 53 22 3.3 -9 692.00 -58.9 -58.6 -59.0 63 -99 SPO 1997 04 05 01 54 22 3.4 -9 692.00 -58.9 -58.6 -59.0 63 -99 SPO 1997 04 05 01 55 22 3.8 -9 692.00 -58.9 -58.6 -58.9 63 -99 SPO 1997 04 05 01 56 23 4.0 -9 691.90 -58.9 -58.5 -58.9 64 -99 SPO 1997 04 05 01 57 24 4.3 -9 691.90 -58.8 -58.6 -58.9 63 -99 SPO 1997 04 05 01 58 23 4.3 -9 691.90 -58.8 -58.5 -58.9 63 -99 SPO 1997 04 05 01 59 21 4.6 -9 691.90 -58.8 -58.4 -58.9 63 -99 SPO 1997 04 05 02 00 19 4.4 -9 691.90 -58.8 -58.4 -58.8 64 0 SPO 1997 04 05 02 01 19 4.5 -9 691.90 -58.7 -58.3 -58.8 63 -99 SPO 1997 04 05 02 02 19 4.5 -9 691.90 -58.7 -58.3 -58.7 64 -99 SPO 1997 04 05 02 03 19 4.5 -9 691.90 -58.6 -58.3 -58.7 64 -99 SPO 1997 04 05 02 04 20 4.7 -9 691.80 -58.6 -58.3 -58.6 64 -99 SPO 1997 04 05 02 05 21 4.8 -9 691.80 -58.5 -58.3 -58.6 64 -99 SPO 1997 04 05 02 06 22 4.8 -9 691.80 -58.5 -58.3 -58.6 64 -99 SPO 1997 04 05 02 07 24 4.7 -9 691.80 -58.5 -58.3 -58.6 65 -99 SPO 1997 04 05 02 08 24 4.6 -9 691.70 -58.5 -58.3 -58.6 65 -99 SPO 1997 04 05 02 09 22 4.9 -9 691.70 -58.5 -58.3 -58.6 65 -99 SPO 1997 04 05 02 10 21 4.8 -9 691.60 -58.4 -58.4 -58.5 64 -99 SPO 1997 04 05 02 11 20 4.8 -9 691.60 -58.4 -58.4 -58.5 64 -99 SPO 1997 04 05 02 12 19 4.7 -9 691.60 -58.4 -58.4 -58.5 65 -99 SPO 1997 04 05 02 13 18 4.8 -9 691.60 -58.4 -58.4 -58.5 66 -99 SPO 1997 04 05 02 14 16 5.1 -9 691.60 -58.4 -58.4 -58.4 66 -99 SPO 1997 04 05 02 15 15 5.0 -9 691.60 -58.3 -58.3 -58.4 66 -99 SPO 1997 04 05 02 16 16 5.5 -9 691.50 -58.3 -58.3 -58.4 66 -99 SPO 1997 04 05 02 17 15 5.4 -9 691.50 -58.3 -58.3 -58.3 67 -99 SPO 1997 04 05 02 18 15 5.4 -9 691.50 -58.2 -58.2 -58.3 65 -99 SPO 1997 04 05 02 19 14 5.5 -9 691.50 -58.2 -58.2 -58.3 65 -99 SPO 1997 04 05 02 20 15 5.5 -9 691.40 -58.2 -58.2 -58.3 65 -99 SPO 1997 04 05 02 21 14 5.6 -9 691.40 -58.2 -58.2 -58.3 64 -99 SPO 1997 04 05 02 22 14 5.8 -9 691.40 -58.2 -58.2 -58.3 64 -99 SPO 1997 04 05 02 23 14 5.7 -9 691.40 -58.2 -58.2 -58.3 65 -99 SPO 1997 04 05 02 24 13 5.4 -9 691.40 -58.2 -58.3 -58.3 66 -99 SPO 1997 04 05 02 25 12 6.0 -9 691.40 -58.2 -58.3 -58.3 66 -99 SPO 1997 04 05 02 26 11 5.9 -9 691.40 -58.3 -58.2 -58.3 67 -99 SPO 1997 04 05 02 27 10 6.0 -9 691.40 -58.3 -58.3 -58.4 68 -99 SPO 1997 04 05 02 28 10 6.1 -9 691.40 -58.2 -58.2 -58.3 66 -99 SPO 1997 04 05 02 29 8 5.9 -9 691.40 -58.2 -58.2 -58.3 66 -99 SPO 1997 04 05 02 30 10 6.1 -9 691.40 -58.2 -58.2 -58.3 65 -99 SPO 1997 04 05 02 31 9 5.9 -9 691.40 -58.2 -58.2 -58.3 65 -99 SPO 1997 04 05 02 32 8 5.9 -9 691.40 -58.2 -58.2 -58.3 64 -99 SPO 1997 04 05 02 33 9 5.9 -9 691.40 -58.2 -58.1 -58.3 63 -99 SPO 1997 04 05 02 34 9 6.0 -9 691.40 -58.2 -58.1 -58.3 63 -99 SPO 1997 04 05 02 35 9 6.3 -9 691.40 -58.2 -58.0 -58.3 64 -99 SPO 1997 04 05 02 36 9 6.0 -9 691.50 -58.2 -58.0 -58.3 64 -99 SPO 1997 04 05 02 37 10 5.9 -9 691.50 -58.2 -58.0 -58.2 64 -99 SPO 1997 04 05 02 38 11 6.0 -9 691.50 -58.2 -58.1 -58.2 65 -99 SPO 1997 04 05 02 39 11 6.2 -9 691.40 -58.2 -58.1 -58.2 65 -99 SPO 1997 04 05 02 40 13 5.8 -9 691.50 -58.2 -58.1 -58.3 66 -99 SPO 1997 04 05 02 41 12 5.7 -9 691.50 -58.2 -58.1 -58.3 65 -99 SPO 1997 04 05 02 42 12 5.9 -9 691.40 -58.2 -58.1 -58.3 65 -99 SPO 1997 04 05 02 43 11 5.8 -9 691.40 -58.2 -58.1 -58.3 64 -99 SPO 1997 04 05 02 44 10 6.0 -9 691.30 -58.2 -58.1 -58.3 64 -99 SPO 1997 04 05 02 45 9 5.7 -9 691.40 -58.2 -58.1 -58.3 64 -99 SPO 1997 04 05 02 46 7 5.8 -9 691.40 -58.2 -58.1 -58.3 65 -99 SPO 1997 04 05 02 47 6 6.0 -9 691.40 -58.2 -58.0 -58.2 65 -99 SPO 1997 04 05 02 48 6 6.1 -9 691.50 -58.2 -58.0 -58.2 65 -99 SPO 1997 04 05 02 49 5 6.2 -9 691.50 -58.1 -57.9 -58.2 66 -99 SPO 1997 04 05 02 50 6 6.1 -9 691.50 -58.1 -57.9 -58.2 66 -99 SPO 1997 04 05 02 51 4 6.0 -9 691.50 -58.1 -57.9 -58.2 66 -99 SPO 1997 04 05 02 52 4 6.1 -9 691.40 -58.1 -58.0 -58.2 66 -99 SPO 1997 04 05 02 53 4 6.1 -9 691.40 -58.1 -58.0 -58.2 64 -99 SPO 1997 04 05 02 54 3 6.2 -9 691.40 -58.1 -58.1 -58.2 64 -99 SPO 1997 04 05 02 55 3 6.2 -9 691.40 -58.1 -58.1 -58.2 63 -99 SPO 1997 04 05 02 56 3 6.2 -9 691.40 -58.2 -58.1 -58.2 65 -99 SPO 1997 04 05 02 57 3 6.3 -9 691.40 -58.1 -58.1 -58.3 63 -99 SPO 1997 04 05 02 58 2 6.2 -9 691.40 -58.2 -58.2 -58.2 65 -99 SPO 1997 04 05 02 59 4 6.0 -9 691.40 -58.2 -58.2 -58.2 65 -99 SPO 1997 04 05 03 00 5 6.3 -9 691.40 -58.2 -58.2 -58.2 66 0 SPO 1997 04 05 03 01 5 6.3 -9 691.40 -58.1 -58.1 -58.2 66 -99 SPO 1997 04 05 03 02 4 6.1 -9 691.40 -58.1 -58.1 -58.2 66 -99 SPO 1997 04 05 03 03 3 6.1 -9 691.40 -58.1 -58.0 -58.1 66 -99 SPO 1997 04 05 03 04 2 5.9 -9 691.40 -58.0 -58.0 -58.1 66 -99 SPO 1997 04 05 03 05 3 6.3 -9 691.40 -58.0 -58.0 -58.0 66 -99 SPO 1997 04 05 03 06 3 6.2 -9 691.30 -58.0 -58.0 -58.0 66 -99 SPO 1997 04 05 03 07 3 6.0 -9 691.40 -57.9 -57.9 -57.9 66 -99 SPO 1997 04 05 03 08 5 6.1 -9 691.40 -57.9 -57.9 -57.9 66 -99 SPO 1997 04 05 03 09 6 6.2 -9 691.40 -57.8 -57.9 -57.9 65 -99 SPO 1997 04 05 03 10 8 6.1 -9 691.40 -57.8 -57.9 -57.8 66 -99 SPO 1997 04 05 03 11 9 5.8 -9 691.40 -57.8 -57.9 -57.8 67 -99 SPO 1997 04 05 03 12 8 6.0 -9 691.40 -57.7 -57.9 -57.8 67 -99 SPO 1997 04 05 03 13 6 6.3 -9 691.40 -57.7 -57.9 -57.8 67 -99 SPO 1997 04 05 03 14 6 6.3 -9 691.40 -57.7 -57.9 -57.8 67 -99 SPO 1997 04 05 03 15 7 6.0 -9 691.40 -57.7 -57.8 -57.8 67 -99 SPO 1997 04 05 03 16 4 6.5 -9 691.30 -57.7 -57.8 -57.8 66 -99 SPO 1997 04 05 03 17 3 6.5 -9 691.30 -57.7 -57.8 -57.8 66 -99 SPO 1997 04 05 03 18 1 6.8 -9 691.30 -57.6 -57.8 -57.7 65 -99 SPO 1997 04 05 03 19 1 6.7 -9 691.20 -57.6 -57.8 -57.7 65 -99 SPO 1997 04 05 03 20 359 7.1 -9 691.20 -57.6 -57.7 -57.7 65 -99 SPO 1997 04 05 03 21 360 6.5 -9 691.20 -57.6 -57.7 -57.7 66 -99 SPO 1997 04 05 03 22 360 6.9 -9 691.20 -57.6 -57.7 -57.7 67 -99 SPO 1997 04 05 03 23 360 7.0 -9 691.20 -57.6 -57.6 -57.7 67 -99 SPO 1997 04 05 03 24 0 6.8 -9 691.20 -57.5 -57.6 -57.6 66 -99 SPO 1997 04 05 03 25 1 7.0 -9 691.20 -57.5 -57.6 -57.6 66 -99 SPO 1997 04 05 03 26 2 6.8 -9 691.30 -57.5 -57.7 -57.6 66 -99 SPO 1997 04 05 03 27 3 6.3 -9 691.30 -57.5 -57.8 -57.6 66 -99 SPO 1997 04 05 03 28 4 6.3 -9 691.30 -57.5 -57.8 -57.6 66 -99 SPO 1997 04 05 03 29 3 6.5 -9 691.30 -57.5 -57.8 -57.6 66 -99 SPO 1997 04 05 03 30 4 6.5 -9 691.30 -57.5 -57.8 -57.7 66 -99 SPO 1997 04 05 03 31 4 6.8 -9 691.30 -57.5 -57.8 -57.7 66 -99 SPO 1997 04 05 03 32 3 6.5 -9 691.30 -57.5 -57.8 -57.7 66 -99 SPO 1997 04 05 03 33 3 6.5 -9 691.30 -57.5 -57.8 -57.7 66 -99 SPO 1997 04 05 03 34 3 6.8 -9 691.30 -57.6 -57.8 -57.7 67 -99 SPO 1997 04 05 03 35 2 7.4 -9 691.20 -57.6 -57.8 -57.7 67 -99 SPO 1997 04 05 03 36 2 7.4 -9 691.20 -57.6 -57.7 -57.7 67 -99 SPO 1997 04 05 03 37 2 7.1 -9 691.20 -57.6 -57.7 -57.7 67 -99 SPO 1997 04 05 03 38 2 7.4 -9 691.20 -57.6 -57.7 -57.7 67 -99 SPO 1997 04 05 03 39 2 7.3 -9 691.30 -57.6 -57.7 -57.7 67 -99 SPO 1997 04 05 03 40 360 7.5 -9 691.20 -57.6 -57.7 -57.7 66 -99 SPO 1997 04 05 03 41 359 7.3 -9 691.30 -57.6 -57.7 -57.7 65 -99 SPO 1997 04 05 03 42 359 7.0 -9 691.30 -57.6 -57.8 -57.7 65 -99 SPO 1997 04 05 03 43 359 6.9 -9 691.30 -57.6 -57.8 -57.7 65 -99 SPO 1997 04 05 03 44 358 7.2 -9 691.30 -57.6 -57.8 -57.7 66 -99 SPO 1997 04 05 03 45 358 7.2 -9 691.30 -57.6 -57.8 -57.7 66 -99 SPO 1997 04 05 03 46 358 7.2 -9 691.20 -57.6 -57.8 -57.7 66 -99 SPO 1997 04 05 03 47 359 6.8 -9 691.30 -57.6 -57.7 -57.7 66 -99 SPO 1997 04 05 03 48 359 7.0 -9 691.30 -57.6 -57.7 -57.7 65 -99 SPO 1997 04 05 03 49 0 6.9 -9 691.30 -57.6 -57.7 -57.7 64 -99 SPO 1997 04 05 03 50 1 6.8 -9 691.30 -57.6 -57.7 -57.7 64 -99 SPO 1997 04 05 03 51 1 6.7 -9 691.40 -57.6 -57.6 -57.7 64 -99 SPO 1997 04 05 03 52 1 6.8 -9 691.40 -57.6 -57.6 -57.6 64 -99 SPO 1997 04 05 03 53 0 7.2 -9 691.40 -57.5 -57.6 -57.6 63 -99 SPO 1997 04 05 03 54 359 6.7 -9 691.40 -57.5 -57.6 -57.6 64 -99 SPO 1997 04 05 03 55 0 6.8 -9 691.50 -57.5 -57.5 -57.6 66 -99 SPO 1997 04 05 03 56 1 6.8 -9 691.50 -57.5 -57.5 -57.5 66 -99 SPO 1997 04 05 03 57 1 6.6 -9 691.50 -57.4 -57.4 -57.5 65 -99 SPO 1997 04 05 03 58 2 6.7 -9 691.50 -57.4 -57.4 -57.5 65 -99 SPO 1997 04 05 03 59 1 6.6 -9 691.50 -57.4 -57.4 -57.5 65 -99 SPO 1997 04 05 04 00 2 6.4 -9 691.40 -57.4 -57.5 -57.5 65 0 SPO 1997 04 05 04 01 1 6.5 -9 691.50 -57.4 -57.4 -57.5 64 -99 SPO 1997 04 05 04 02 1 6.5 -9 691.50 -57.4 -57.4 -57.5 63 -99 SPO 1997 04 05 04 03 360 6.7 -9 691.50 -57.4 -57.4 -57.5 63 -99 SPO 1997 04 05 04 04 359 6.7 -9 691.40 -57.4 -57.3 -57.4 63 -99 SPO 1997 04 05 04 05 360 6.5 -9 691.40 -57.3 -57.2 -57.4 63 -99 SPO 1997 04 05 04 06 1 6.7 -9 691.50 -57.3 -57.2 -57.4 64 -99 SPO 1997 04 05 04 07 2 6.2 -9 691.50 -57.3 -57.1 -57.3 65 -99 SPO 1997 04 05 04 08 2 6.1 -9 691.50 -57.2 -57.0 -57.3 65 -99 SPO 1997 04 05 04 09 1 6.5 -9 691.50 -57.2 -57.0 -57.2 65 -99 SPO 1997 04 05 04 10 1 6.3 -9 691.50 -57.2 -56.9 -57.2 66 -99 SPO 1997 04 05 04 11 2 6.2 -9 691.50 -57.1 -56.9 -57.2 65 -99 SPO 1997 04 05 04 12 3 6.1 -9 691.50 -57.1 -56.8 -57.1 65 -99 SPO 1997 04 05 04 13 3 6.5 -9 691.50 -57.1 -56.8 -57.1 65 -99 SPO 1997 04 05 04 14 5 6.4 -9 691.60 -57.0 -56.8 -57.1 64 -99 SPO 1997 04 05 04 15 5 6.2 -9 691.60 -57.0 -56.9 -57.1 64 -99 SPO 1997 04 05 04 16 4 5.8 -9 691.60 -57.0 -57.0 -57.1 65 -99 SPO 1997 04 05 04 17 5 5.8 -9 691.60 -57.0 -56.9 -57.1 66 -99 SPO 1997 04 05 04 18 7 5.6 -9 691.70 -56.9 -56.9 -57.1 66 -99 SPO 1997 04 05 04 19 11 4.9 -9 691.70 -56.9 -56.9 -57.1 66 -99 SPO 1997 04 05 04 20 14 5.0 -9 691.80 -56.9 -56.9 -57.0 67 -99 SPO 1997 04 05 04 21 16 4.7 -9 691.80 -56.9 -56.9 -57.0 66 -99 SPO 1997 04 05 04 22 16 4.6 -9 691.80 -56.9 -56.9 -57.1 66 -99 SPO 1997 04 05 04 23 16 4.4 -9 691.90 -56.9 -56.9 -57.0 66 -99 SPO 1997 04 05 04 24 15 4.1 -9 691.90 -56.9 -56.9 -57.1 66 -99 SPO 1997 04 05 04 25 13 4.1 -9 691.90 -57.0 -56.9 -57.1 66 -99 SPO 1997 04 05 04 26 13 4.4 -9 691.90 -57.0 -56.9 -57.0 65 -99 SPO 1997 04 05 04 27 14 4.7 -9 691.90 -56.9 -56.9 -57.0 65 -99 SPO 1997 04 05 04 28 12 5.2 -9 691.90 -56.9 -56.9 -57.0 66 -99 SPO 1997 04 05 04 29 10 4.9 -9 691.90 -56.9 -57.0 -57.0 66 -99 SPO 1997 04 05 04 30 9 5.4 -9 691.80 -56.9 -57.0 -57.1 66 -99 SPO 1997 04 05 04 31 6 5.2 -9 691.80 -57.0 -57.1 -57.1 68 -99 SPO 1997 04 05 04 32 6 5.2 -9 691.80 -57.0 -57.1 -57.1 67 -99 SPO 1997 04 05 04 33 6 5.2 -9 691.80 -56.9 -57.2 -57.1 66 -99 SPO 1997 04 05 04 34 5 5.1 -9 691.80 -57.0 -57.2 -57.1 67 -99 SPO 1997 04 05 04 35 4 5.1 -9 691.80 -57.0 -57.2 -57.1 66 -99 SPO 1997 04 05 04 36 5 5.5 -9 691.80 -57.0 -57.2 -57.1 65 -99 SPO 1997 04 05 04 37 1 5.6 -9 691.80 -57.0 -57.1 -57.1 65 -99 SPO 1997 04 05 04 38 1 6.2 -9 691.70 -57.0 -57.1 -57.0 65 -99 SPO 1997 04 05 04 39 1 5.8 -9 691.70 -56.9 -57.0 -57.0 64 -99 SPO 1997 04 05 04 40 360 6.2 -9 691.70 -56.9 -57.0 -57.0 65 -99 SPO 1997 04 05 04 41 0 6.2 -9 691.70 -56.9 -57.0 -57.0 66 -99 SPO 1997 04 05 04 42 0 6.0 -9 691.70 -56.9 -57.1 -57.0 66 -99 SPO 1997 04 05 04 43 359 6.2 -9 691.70 -56.9 -57.0 -57.0 68 -99 SPO 1997 04 05 04 44 360 6.5 -9 691.70 -56.9 -57.0 -56.9 68 -99 SPO 1997 04 05 04 45 360 6.3 -9 691.70 -56.8 -57.0 -56.9 67 -99 SPO 1997 04 05 04 46 359 6.5 -9 691.80 -56.8 -57.0 -56.8 66 -99 SPO 1997 04 05 04 47 355 6.2 -9 691.80 -56.8 -57.0 -56.8 67 -99 SPO 1997 04 05 04 48 357 6.8 -9 691.80 -56.7 -56.9 -56.8 65 -99 SPO 1997 04 05 04 49 357 6.6 -9 691.90 -56.7 -56.9 -56.7 65 -99 SPO 1997 04 05 04 50 357 6.7 -9 691.90 -56.7 -56.8 -56.7 66 -99 SPO 1997 04 05 04 51 358 6.5 -9 691.90 -56.6 -56.8 -56.6 65 -99 SPO 1997 04 05 04 52 358 6.5 -9 691.90 -56.6 -56.8 -56.6 67 -99 SPO 1997 04 05 04 53 358 6.9 -9 691.90 -56.5 -56.8 -56.6 66 -99 SPO 1997 04 05 04 54 359 6.7 -9 691.90 -56.5 -56.7 -56.6 66 -99 SPO 1997 04 05 04 55 358 7.1 -9 691.90 -56.5 -56.7 -56.6 67 -99 SPO 1997 04 05 04 56 359 6.9 -9 691.90 -56.5 -56.7 -56.6 68 -99 SPO 1997 04 05 04 57 358 7.8 -9 691.80 -56.5 -56.7 -56.6 68 -99 SPO 1997 04 05 04 58 358 7.8 -9 691.80 -56.4 -56.6 -56.6 67 -99 SPO 1997 04 05 04 59 358 7.5 -9 691.80 -56.4 -56.6 -56.6 67 -99 SPO 1997 04 05 05 00 359 7.2 -9 691.70 -56.4 -56.6 -56.6 67 0 SPO 1997 04 05 05 01 359 7.7 -9 691.60 -56.4 -56.6 -56.6 66 -99 SPO 1997 04 05 05 02 358 8.6 -9 691.60 -56.4 -56.6 -56.6 66 -99 SPO 1997 04 05 05 03 356 8.7 -9 691.60 -56.4 -56.7 -56.6 67 -99 SPO 1997 04 05 05 04 356 8.6 -9 691.60 -56.4 -56.7 -56.6 67 -99 SPO 1997 04 05 05 05 356 8.3 -9 691.60 -56.5 -56.7 -56.6 69 -99 SPO 1997 04 05 05 06 358 8.5 -9 691.50 -56.5 -56.6 -56.5 68 -99 SPO 1997 04 05 05 07 358 8.5 -9 691.50 -56.5 -56.6 -56.5 69 -99 SPO 1997 04 05 05 08 355 8.3 -9 691.50 -56.5 -56.5 -56.5 69 -99 SPO 1997 04 05 05 09 354 8.9 -9 691.50 -56.4 -56.5 -56.4 67 -99 SPO 1997 04 05 05 10 356 8.4 -9 691.50 -56.3 -56.4 -56.4 66 -99 SPO 1997 04 05 05 11 355 9.2 -9 691.50 -56.3 -56.4 -56.4 66 -99 SPO 1997 04 05 05 12 355 9.4 -9 691.40 -56.3 -56.4 -56.5 66 -99 SPO 1997 04 05 05 13 356 9.2 -9 691.40 -56.3 -56.4 -56.5 66 -99 SPO 1997 04 05 05 14 355 9.0 -9 691.50 -56.3 -56.3 -56.5 66 -99 SPO 1997 04 05 05 15 356 8.5 -9 691.50 -56.3 -56.3 -56.4 67 -99 SPO 1997 04 05 05 16 357 8.9 -9 691.50 -56.3 -56.3 -56.4 67 -99 SPO 1997 04 05 05 17 358 8.7 -9 691.40 -56.3 -56.3 -56.4 67 -99 SPO 1997 04 05 05 18 358 8.7 -9 691.50 -56.3 -56.2 -56.4 67 -99 SPO 1997 04 05 05 19 357 8.6 -9 691.50 -56.2 -56.2 -56.3 66 -99 SPO 1997 04 05 05 20 358 8.4 -9 691.50 -56.2 -56.2 -56.2 66 -99 SPO 1997 04 05 05 21 356 8.8 -9 691.50 -56.2 -56.1 -56.2 66 -99 SPO 1997 04 05 05 22 357 8.8 -9 691.50 -56.2 -56.1 -56.2 66 -99 SPO 1997 04 05 05 23 358 8.5 -9 691.50 -56.1 -56.1 -56.2 66 -99 SPO 1997 04 05 05 24 357 8.9 -9 691.50 -56.1 -56.1 -56.2 66 -99 SPO 1997 04 05 05 25 358 8.7 -9 691.50 -56.1 -56.1 -56.1 66 -99 SPO 1997 04 05 05 26 358 8.8 -9 691.40 -56.1 -56.0 -56.2 67 -99 SPO 1997 04 05 05 27 357 9.1 -9 691.40 -56.1 -56.0 -56.2 68 -99 SPO 1997 04 05 05 28 358 8.8 -9 691.50 -56.0 -56.0 -56.2 67 -99 SPO 1997 04 05 05 29 358 9.0 -9 691.40 -56.0 -56.0 -56.1 67 -99 SPO 1997 04 05 05 30 357 8.8 -9 691.40 -56.0 -55.9 -56.1 68 -99 SPO 1997 04 05 05 31 357 8.9 -9 691.50 -56.0 -55.8 -56.1 68 -99 SPO 1997 04 05 05 32 357 8.6 -9 691.50 -56.0 -55.8 -56.0 67 -99 SPO 1997 04 05 05 33 357 8.8 -9 691.50 -55.9 -55.8 -56.0 66 -99 SPO 1997 04 05 05 34 358 9.0 -9 691.40 -55.9 -55.8 -56.1 66 -99 SPO 1997 04 05 05 35 356 9.3 -9 691.40 -55.9 -55.9 -56.1 66 -99 SPO 1997 04 05 05 36 356 9.3 -9 691.40 -56.0 -56.0 -56.1 66 -99 SPO 1997 04 05 05 37 356 9.1 -9 691.40 -56.0 -56.0 -56.1 67 -99 SPO 1997 04 05 05 38 355 8.9 -9 691.50 -56.0 -56.0 -56.1 67 -99 SPO 1997 04 05 05 39 355 8.9 -9 691.50 -56.0 -56.0 -56.0 68 -99 SPO 1997 04 05 05 40 356 8.8 -9 691.50 -55.9 -55.8 -56.0 67 -99 SPO 1997 04 05 05 41 357 8.4 -9 691.50 -55.9 -55.8 -55.9 67 -99 SPO 1997 04 05 05 42 357 9.1 -9 691.50 -55.9 -55.8 -56.0 68 -99 SPO 1997 04 05 05 43 356 9.8 -9 691.50 -55.9 -55.9 -56.1 68 -99 SPO 1997 04 05 05 44 355 9.2 -9 691.50 -56.0 -55.9 -56.1 68 -99 SPO 1997 04 05 05 45 354 9.3 -9 691.50 -55.8 -56.0 -56.0 65 -99 SPO 1997 04 05 05 46 354 9.0 -9 691.50 -55.9 -56.0 -56.0 66 -99 SPO 1997 04 05 05 47 354 9.5 -9 691.50 -55.9 -55.9 -56.0 66 -99 SPO 1997 04 05 05 48 355 9.2 -9 691.50 -55.9 -55.9 -56.0 66 -99 SPO 1997 04 05 05 49 356 9.0 -9 691.50 -55.9 -56.0 -56.0 66 -99 SPO 1997 04 05 05 50 355 9.5 -9 691.50 -55.9 -56.0 -56.0 67 -99 SPO 1997 04 05 05 51 356 9.4 -9 691.50 -55.9 -56.0 -56.0 67 -99 SPO 1997 04 05 05 52 356 9.7 -9 691.50 -55.9 -56.0 -56.0 67 -99 SPO 1997 04 05 05 53 355 9.5 -9 691.50 -55.9 -56.1 -56.0 67 -99 SPO 1997 04 05 05 54 355 9.0 -9 691.50 -55.9 -56.1 -56.0 66 -99 SPO 1997 04 05 05 55 356 9.4 -9 691.50 -55.9 -56.1 -56.0 66 -99 SPO 1997 04 05 05 56 356 9.4 -9 691.60 -55.9 -56.1 -56.0 66 -99 SPO 1997 04 05 05 57 355 9.5 -9 691.60 -55.9 -56.0 -55.9 65 -99 SPO 1997 04 05 05 58 355 9.2 -9 691.50 -55.8 -56.0 -55.9 65 -99 SPO 1997 04 05 05 59 356 9.1 -9 691.60 -55.8 -55.9 -55.8 65 -99 SPO 1997 04 05 06 00 355 9.6 -9 691.60 -55.8 -55.8 -55.8 65 0 SPO 1997 04 05 06 01 355 8.9 -9 691.60 -55.7 -55.8 -55.7 66 -99 SPO 1997 04 05 06 02 355 9.4 -9 691.60 -55.6 -55.7 -55.7 65 -99 SPO 1997 04 05 06 03 355 9.2 -9 691.60 -55.5 -55.7 -55.6 65 -99 SPO 1997 04 05 06 04 354 9.2 -9 691.60 -55.6 -55.7 -55.7 66 -99 SPO 1997 04 05 06 05 355 9.1 -9 691.60 -55.6 -55.6 -55.6 67 -99 SPO 1997 04 05 06 06 355 9.6 -9 691.60 -55.5 -55.6 -55.6 66 -99 SPO 1997 04 05 06 07 354 9.7 -9 691.60 -55.5 -55.6 -55.7 65 -99 SPO 1997 04 05 06 08 353 9.5 -9 691.60 -55.5 -55.7 -55.6 65 -99 SPO 1997 04 05 06 09 354 8.9 -9 691.60 -55.5 -55.7 -55.6 65 -99 SPO 1997 04 05 06 10 354 9.6 -9 691.50 -55.5 -55.7 -55.6 65 -99 SPO 1997 04 05 06 11 354 9.7 -9 691.50 -55.4 -55.6 -55.5 65 -99 SPO 1997 04 05 06 12 355 9.1 -9 691.50 -55.4 -55.6 -55.4 65 -99 SPO 1997 04 05 06 13 355 9.6 -9 691.50 -55.4 -55.6 -55.4 66 -99 SPO 1997 04 05 06 14 355 9.5 -9 691.50 -55.3 -55.5 -55.4 66 -99 SPO 1997 04 05 06 15 355 9.4 -9 691.50 -55.3 -55.5 -55.4 67 -99 SPO 1997 04 05 06 16 355 9.6 -9 691.50 -55.3 -55.5 -55.4 68 -99 SPO 1997 04 05 06 17 356 10.1 -9 691.50 -55.3 -55.5 -55.4 68 -99 SPO 1997 04 05 06 18 355 9.6 -9 691.40 -55.3 -55.4 -55.3 68 -99 SPO 1997 04 05 06 19 356 9.9 -9 691.40 -55.3 -55.4 -55.3 68 -99 SPO 1997 04 05 06 20 356 9.8 -9 691.40 -55.2 -55.5 -55.3 66 -99 SPO 1997 04 05 06 21 356 10.2 -9 691.40 -55.1 -55.4 -55.3 66 -99 SPO 1997 04 05 06 22 356 10.0 -9 691.40 -55.1 -55.3 -55.3 66 -99 SPO 1997 04 05 06 23 357 9.5 -9 691.40 -55.1 -55.3 -55.2 66 -99 SPO 1997 04 05 06 24 357 9.7 -9 691.40 -55.1 -55.3 -55.2 66 -99 SPO 1997 04 05 06 25 356 9.7 -9 691.40 -55.1 -55.3 -55.1 66 -99 SPO 1997 04 05 06 26 356 10.0 -9 691.50 -55.0 -55.3 -55.1 67 -99 SPO 1997 04 05 06 27 356 9.6 -9 691.50 -55.0 -55.3 -55.1 67 -99 SPO 1997 04 05 06 28 357 9.8 -9 691.50 -55.0 -55.3 -55.1 67 -99 SPO 1997 04 05 06 29 357 10.1 -9 691.50 -55.0 -55.3 -55.1 68 -99 SPO 1997 04 05 06 30 355 9.7 -9 691.50 -55.0 -55.3 -55.1 68 -99 SPO 1997 04 05 06 31 356 9.0 -9 691.50 -55.0 -55.2 -55.0 67 -99 SPO 1997 04 05 06 32 356 9.4 -9 691.50 -54.9 -55.2 -55.0 66 -99 SPO 1997 04 05 06 33 355 9.7 -9 691.50 -54.9 -55.1 -55.0 66 -99 SPO 1997 04 05 06 34 355 9.6 -9 691.60 -54.8 -55.1 -54.9 66 -99 SPO 1997 04 05 06 35 355 8.6 -9 691.60 -54.8 -55.0 -54.8 67 -99 SPO 1997 04 05 06 36 358 9.7 -9 691.60 -54.8 -55.0 -54.8 69 -99 SPO 1997 04 05 06 37 355 9.7 -9 691.60 -54.7 -54.8 -54.8 68 -99 SPO 1997 04 05 06 38 356 9.0 -9 691.60 -54.7 -54.8 -54.8 69 -99 SPO 1997 04 05 06 39 355 9.9 -9 691.70 -54.7 -54.8 -54.7 70 -99 SPO 1997 04 05 06 40 353 9.7 -9 691.70 -54.6 -54.7 -54.7 68 -99 SPO 1997 04 05 06 41 355 9.0 -9 691.70 -54.6 -54.7 -54.7 68 -99 SPO 1997 04 05 06 42 354 9.2 -9 691.70 -54.6 -54.8 -54.7 67 -99 SPO 1997 04 05 06 43 352 9.2 -9 691.70 -54.6 -54.8 -54.7 67 -99 SPO 1997 04 05 06 44 353 8.8 -9 691.80 -54.6 -54.8 -54.6 67 -99 SPO 1997 04 05 06 45 352 8.4 -9 691.80 -54.5 -54.7 -54.6 67 -99 SPO 1997 04 05 06 46 353 9.0 -9 691.80 -54.5 -54.8 -54.6 67 -99 SPO 1997 04 05 06 47 353 8.6 -9 691.80 -54.5 -54.8 -54.6 68 -99 SPO 1997 04 05 06 48 352 8.7 -9 691.80 -54.5 -54.8 -54.6 69 -99 SPO 1997 04 05 06 49 353 8.2 -9 691.90 -54.5 -54.7 -54.6 69 -99 SPO 1997 04 05 06 50 354 8.5 -9 691.90 -54.5 -54.7 -54.6 68 -99 SPO 1997 04 05 06 51 354 9.2 -9 691.90 -54.5 -54.8 -54.6 69 -99 SPO 1997 04 05 06 52 354 9.0 -9 691.80 -54.5 -54.8 -54.7 69 -99 SPO 1997 04 05 06 53 353 8.7 -9 691.80 -54.5 -54.6 -54.6 68 -99 SPO 1997 04 05 06 54 355 8.6 -9 691.80 -54.5 -54.6 -54.6 68 -99 SPO 1997 04 05 06 55 353 9.3 -9 691.80 -54.5 -54.6 -54.6 67 -99 SPO 1997 04 05 06 56 353 8.9 -9 691.80 -54.5 -54.6 -54.6 67 -99 SPO 1997 04 05 06 57 352 8.7 -9 691.80 -54.5 -54.6 -54.6 67 -99 SPO 1997 04 05 06 58 353 8.9 -9 691.80 -54.5 -54.6 -54.6 68 -99 SPO 1997 04 05 06 59 353 9.2 -9 691.80 -54.4 -54.7 -54.6 68 -99 SPO 1997 04 05 07 00 354 8.5 -9 691.80 -54.4 -54.7 -54.5 69 0 SPO 1997 04 05 07 01 354 8.8 -9 691.90 -54.4 -54.7 -54.5 69 -99 SPO 1997 04 05 07 02 354 8.9 -9 691.90 -54.4 -54.7 -54.5 69 -99 SPO 1997 04 05 07 03 354 8.9 -9 691.90 -54.4 -54.7 -54.5 69 -99 SPO 1997 04 05 07 04 354 8.8 -9 691.90 -54.4 -54.7 -54.5 68 -99 SPO 1997 04 05 07 05 355 8.1 -9 691.90 -54.4 -54.7 -54.5 68 -99 SPO 1997 04 05 07 06 354 8.3 -9 691.90 -54.4 -54.6 -54.4 68 -99 SPO 1997 04 05 07 07 355 8.7 -9 691.90 -54.3 -54.6 -54.4 67 -99 SPO 1997 04 05 07 08 356 8.8 -9 691.90 -54.3 -54.6 -54.4 67 -99 SPO 1997 04 05 07 09 354 8.8 -9 691.90 -54.3 -54.6 -54.4 67 -99 SPO 1997 04 05 07 10 354 7.9 -9 691.90 -54.2 -54.5 -54.3 67 -99 SPO 1997 04 05 07 11 352 8.5 -9 691.80 -54.2 -54.4 -54.2 68 -99 SPO 1997 04 05 07 12 354 8.6 -9 691.80 -54.2 -54.4 -54.2 69 -99 SPO 1997 04 05 07 13 353 8.6 -9 691.80 -54.1 -54.4 -54.2 68 -99 SPO 1997 04 05 07 14 353 8.6 -9 691.80 -54.1 -54.3 -54.2 68 -99 SPO 1997 04 05 07 15 353 8.4 -9 691.80 -54.1 -54.3 -54.2 68 -99 SPO 1997 04 05 07 16 351 8.8 -9 691.80 -54.1 -54.4 -54.2 67 -99 SPO 1997 04 05 07 17 352 9.3 -9 691.80 -54.1 -54.4 -54.2 68 -99 SPO 1997 04 05 07 18 354 8.9 -9 691.80 -54.1 -54.4 -54.2 68 -99 SPO 1997 04 05 07 19 354 8.8 -9 691.80 -54.1 -54.3 -54.2 67 -99 SPO 1997 04 05 07 20 353 8.5 -9 691.80 -54.0 -54.2 -54.1 67 -99 SPO 1997 04 05 07 21 353 8.7 -9 691.70 -54.0 -54.2 -54.1 67 -99 SPO 1997 04 05 07 22 354 8.7 -9 691.70 -54.0 -54.2 -54.2 68 -99 SPO 1997 04 05 07 23 354 8.6 -9 691.70 -54.0 -54.1 -54.2 69 -99 SPO 1997 04 05 07 24 353 8.9 -9 691.70 -54.0 -54.0 -54.2 69 -99 SPO 1997 04 05 07 25 354 9.1 -9 691.60 -54.0 -54.0 -54.1 69 -99 SPO 1997 04 05 07 26 356 8.4 -9 691.60 -54.0 -54.0 -54.1 69 -99 SPO 1997 04 05 07 27 354 9.2 -9 691.60 -53.9 -54.0 -54.0 68 -99 SPO 1997 04 05 07 28 354 8.9 -9 691.60 -53.9 -53.8 -54.0 68 -99 SPO 1997 04 05 07 29 354 9.3 -9 691.60 -53.9 -53.8 -54.0 67 -99 SPO 1997 04 05 07 30 355 8.9 -9 691.60 -53.9 -53.7 -54.0 67 -99 SPO 1997 04 05 07 31 354 9.5 -9 691.60 -53.9 -53.7 -54.0 67 -99 SPO 1997 04 05 07 32 354 8.6 -9 691.60 -53.9 -53.7 -54.0 67 -99 SPO 1997 04 05 07 33 354 9.1 -9 691.60 -53.9 -53.8 -54.0 68 -99 SPO 1997 04 05 07 34 354 8.8 -9 691.60 -53.9 -53.8 -54.0 68 -99 SPO 1997 04 05 07 35 353 9.5 -9 691.60 -53.9 -53.9 -54.0 69 -99 SPO 1997 04 05 07 36 353 9.4 -9 691.60 -53.9 -53.9 -54.0 69 -99 SPO 1997 04 05 07 37 353 9.2 -9 691.60 -53.9 -53.8 -53.9 68 -99 SPO 1997 04 05 07 38 353 9.2 -9 691.60 -53.9 -53.8 -54.0 68 -99 SPO 1997 04 05 07 39 354 9.5 -9 691.60 -53.9 -53.9 -54.0 68 -99 SPO 1997 04 05 07 40 353 9.2 -9 691.60 -53.9 -53.9 -53.9 68 -99 SPO 1997 04 05 07 41 352 9.4 -9 691.60 -53.8 -53.8 -53.9 67 -99 SPO 1997 04 05 07 42 353 9.5 -9 691.60 -53.8 -53.8 -53.8 67 -99 SPO 1997 04 05 07 43 353 9.2 -9 691.60 -53.7 -53.7 -53.8 67 -99 SPO 1997 04 05 07 44 353 9.1 -9 691.60 -53.7 -53.7 -53.8 68 -99 SPO 1997 04 05 07 45 354 9.2 -9 691.60 -53.7 -53.6 -53.7 69 -99 SPO 1997 04 05 07 46 354 8.9 -9 691.70 -53.7 -53.6 -53.7 69 -99 SPO 1997 04 05 07 47 355 8.9 -9 691.70 -53.6 -53.5 -53.7 68 -99 SPO 1997 04 05 07 48 354 8.8 -9 691.70 -53.6 -53.5 -53.7 68 -99 SPO 1997 04 05 07 49 354 8.8 -9 691.80 -53.6 -53.6 -53.7 68 -99 SPO 1997 04 05 07 50 353 8.8 -9 691.80 -53.6 -53.8 -53.7 68 -99 SPO 1997 04 05 07 51 353 8.2 -9 691.80 -53.6 -53.8 -53.7 68 -99 SPO 1997 04 05 07 52 352 8.8 -9 691.70 -53.6 -53.8 -53.6 67 -99 SPO 1997 04 05 07 53 353 8.7 -9 691.70 -53.5 -53.7 -53.6 66 -99 SPO 1997 04 05 07 54 353 8.6 -9 691.70 -53.5 -53.7 -53.6 66 -99 SPO 1997 04 05 07 55 354 8.6 -9 691.70 -53.5 -53.7 -53.5 66 -99 SPO 1997 04 05 07 56 354 8.6 -9 691.70 -53.5 -53.6 -53.5 68 -99 SPO 1997 04 05 07 57 354 8.8 -9 691.70 -53.4 -53.6 -53.5 68 -99 SPO 1997 04 05 07 58 354 8.9 -9 691.80 -53.4 -53.5 -53.4 68 -99 SPO 1997 04 05 07 59 353 8.8 -9 691.80 -53.4 -53.5 -53.4 69 -99 SPO 1997 04 05 08 00 352 8.6 -9 691.80 -53.4 -53.5 -53.5 70 0 SPO 1997 04 05 08 01 353 8.5 -9 691.80 -53.4 -53.5 -53.5 70 -99 SPO 1997 04 05 08 02 353 7.8 -9 691.80 -53.4 -53.6 -53.5 69 -99 SPO 1997 04 05 08 03 353 8.2 -9 691.80 -53.4 -53.5 -53.5 69 -99 SPO 1997 04 05 08 04 352 8.7 -9 691.80 -53.4 -53.5 -53.5 69 -99 SPO 1997 04 05 08 05 353 8.7 -9 691.80 -53.4 -53.4 -53.4 68 -99 SPO 1997 04 05 08 06 353 8.5 -9 691.80 -53.3 -53.4 -53.4 67 -99 SPO 1997 04 05 08 07 354 8.6 -9 691.80 -53.3 -53.5 -53.4 68 -99 SPO 1997 04 05 08 08 353 8.3 -9 691.80 -53.3 -53.6 -53.4 68 -99 SPO 1997 04 05 08 09 353 8.3 -9 691.80 -53.3 -53.6 -53.5 68 -99 SPO 1997 04 05 08 10 354 9.0 -9 691.80 -53.3 -53.6 -53.4 68 -99 SPO 1997 04 05 08 11 353 8.7 -9 691.80 -53.3 -53.5 -53.4 68 -99 SPO 1997 04 05 08 12 353 8.7 -9 691.80 -53.3 -53.5 -53.4 68 -99 SPO 1997 04 05 08 13 352 9.0 -9 691.80 -53.3 -53.5 -53.4 68 -99 SPO 1997 04 05 08 14 351 8.6 -9 691.80 -53.3 -53.4 -53.3 68 -99 SPO 1997 04 05 08 15 352 8.4 -9 691.80 -53.2 -53.4 -53.3 67 -99 SPO 1997 04 05 08 16 352 8.8 -9 691.80 -53.2 -53.4 -53.3 67 -99 SPO 1997 04 05 08 17 352 9.1 -9 691.80 -53.2 -53.3 -53.3 67 -99 SPO 1997 04 05 08 18 352 8.9 -9 691.80 -53.2 -53.3 -53.2 68 -99 SPO 1997 04 05 08 19 353 8.9 -9 691.80 -53.2 -53.2 -53.2 68 -99 SPO 1997 04 05 08 20 352 8.6 -9 691.80 -53.1 -53.2 -53.2 68 -99 SPO 1997 04 05 08 21 352 8.4 -9 691.90 -53.1 -53.2 -53.2 68 -99 SPO 1997 04 05 08 22 352 8.7 -9 691.90 -53.1 -53.2 -53.2 68 -99 SPO 1997 04 05 08 23 352 8.9 -9 691.80 -53.1 -53.2 -53.2 68 -99 SPO 1997 04 05 08 24 353 8.4 -9 691.80 -53.1 -53.2 -53.1 68 -99 SPO 1997 04 05 08 25 352 8.6 -9 691.90 -53.0 -53.2 -53.1 68 -99 SPO 1997 04 05 08 26 352 8.3 -9 691.90 -53.0 -53.1 -53.0 68 -99 SPO 1997 04 05 08 27 352 8.2 -9 691.90 -53.0 -53.1 -53.0 68 -99 SPO 1997 04 05 08 28 351 8.0 -9 692.00 -53.0 -53.1 -53.0 68 -99 SPO 1997 04 05 08 29 351 7.9 -9 692.00 -52.9 -53.1 -53.0 68 -99 SPO 1997 04 05 08 30 353 7.7 -9 691.90 -52.9 -53.1 -53.0 68 -99 SPO 1997 04 05 08 31 353 8.0 -9 691.90 -52.9 -53.1 -53.0 69 -99 SPO 1997 04 05 08 32 354 8.2 -9 691.90 -52.9 -53.0 -53.0 69 -99 SPO 1997 04 05 08 33 354 8.4 -9 691.90 -52.8 -53.0 -52.9 69 -99 SPO 1997 04 05 08 34 354 8.0 -9 691.90 -52.8 -52.9 -52.9 69 -99 SPO 1997 04 05 08 35 355 8.4 -9 691.90 -52.8 -52.9 -52.8 69 -99 SPO 1997 04 05 08 36 356 8.0 -9 691.90 -52.8 -52.9 -52.9 69 -99 SPO 1997 04 05 08 37 354 8.6 -9 691.90 -52.8 -52.9 -52.8 69 -99 SPO 1997 04 05 08 38 353 8.6 -9 691.90 -52.7 -52.9 -52.8 68 -99 SPO 1997 04 05 08 39 355 8.3 -9 691.90 -52.7 -52.9 -52.8 68 -99 SPO 1997 04 05 08 40 355 8.1 -9 691.90 -52.7 -52.9 -52.8 68 -99 SPO 1997 04 05 08 41 352 8.1 -9 691.90 -52.7 -52.9 -52.8 68 -99 SPO 1997 04 05 08 42 353 7.6 -9 691.90 -52.7 -52.9 -52.7 69 -99 SPO 1997 04 05 08 43 354 8.4 -9 691.90 -52.6 -52.9 -52.8 68 -99 SPO 1997 04 05 08 44 354 8.6 -9 691.90 -52.6 -52.8 -52.7 69 -99 SPO 1997 04 05 08 45 354 8.6 -9 691.80 -52.6 -52.8 -52.7 69 -99 SPO 1997 04 05 08 46 355 7.9 -9 691.90 -52.6 -52.9 -52.8 69 -99 SPO 1997 04 05 08 47 355 8.6 -9 691.90 -52.6 -52.9 -52.8 70 -99 SPO 1997 04 05 08 48 355 8.3 -9 691.80 -52.6 -52.8 -52.7 70 -99 SPO 1997 04 05 08 49 356 8.3 -9 691.80 -52.6 -52.6 -52.6 69 -99 SPO 1997 04 05 08 50 357 8.5 -9 691.80 -52.6 -52.5 -52.7 69 -99 SPO 1997 04 05 08 51 356 7.9 -9 691.80 -52.6 -52.5 -52.7 69 -99 SPO 1997 04 05 08 52 355 7.8 -9 691.80 -52.5 -52.5 -52.6 68 -99 SPO 1997 04 05 08 53 353 8.0 -9 691.80 -52.5 -52.5 -52.6 69 -99 SPO 1997 04 05 08 54 351 8.2 -9 691.80 -52.5 -52.4 -52.4 69 -99 SPO 1997 04 05 08 55 352 8.4 -9 691.90 -52.4 -52.4 -52.4 69 -99 SPO 1997 04 05 08 56 352 8.3 -9 691.90 -52.4 -52.3 -52.4 69 -99 SPO 1997 04 05 08 57 350 8.6 -9 691.90 -52.3 -52.3 -52.4 68 -99 SPO 1997 04 05 08 58 354 8.4 -9 691.90 -52.3 -52.3 -52.4 69 -99 SPO 1997 04 05 08 59 354 8.2 -9 691.80 -52.3 -52.4 -52.5 69 -99 SPO 1997 04 05 09 00 355 8.4 -9 691.90 -52.3 -52.5 -52.5 69 0 SPO 1997 04 05 09 01 354 7.9 -9 691.90 -52.4 -52.5 -52.5 69 -99 SPO 1997 04 05 09 02 355 7.9 -9 691.90 -52.3 -52.5 -52.4 68 -99 SPO 1997 04 05 09 03 353 8.7 -9 691.90 -52.3 -52.5 -52.4 67 -99 SPO 1997 04 05 09 04 354 8.4 -9 691.90 -52.3 -52.4 -52.4 68 -99 SPO 1997 04 05 09 05 356 8.6 -9 691.80 -52.3 -52.4 -52.5 68 -99 SPO 1997 04 05 09 06 353 8.6 -9 691.80 -52.3 -52.5 -52.5 68 -99 SPO 1997 04 05 09 07 353 8.5 -9 691.80 -52.4 -52.5 -52.5 69 -99 SPO 1997 04 05 09 08 354 8.1 -9 691.80 -52.4 -52.4 -52.5 69 -99 SPO 1997 04 05 09 09 354 8.1 -9 691.80 -52.4 -52.5 -52.5 69 -99 SPO 1997 04 05 09 10 352 8.4 -9 691.80 -52.4 -52.5 -52.5 69 -99 SPO 1997 04 05 09 11 352 8.7 -9 691.80 -52.4 -52.4 -52.5 69 -99 SPO 1997 04 05 09 12 352 8.1 -9 691.80 -52.3 -52.4 -52.4 69 -99 SPO 1997 04 05 09 13 352 8.7 -9 691.80 -52.3 -52.4 -52.4 68 -99 SPO 1997 04 05 09 14 351 8.6 -9 691.80 -52.3 -52.4 -52.5 67 -99 SPO 1997 04 05 09 15 352 8.2 -9 691.80 -52.3 -52.4 -52.5 67 -99 SPO 1997 04 05 09 16 352 8.3 -9 691.80 -52.4 -52.5 -52.5 68 -99 SPO 1997 04 05 09 17 352 8.9 -9 691.80 -52.4 -52.6 -52.5 68 -99 SPO 1997 04 05 09 18 351 8.4 -9 691.80 -52.4 -52.6 -52.5 69 -99 SPO 1997 04 05 09 19 350 8.7 -9 691.80 -52.4 -52.6 -52.5 69 -99 SPO 1997 04 05 09 20 350 9.0 -9 691.80 -52.3 -52.6 -52.4 68 -99 SPO 1997 04 05 09 21 350 8.2 -9 691.80 -52.3 -52.5 -52.4 69 -99 SPO 1997 04 05 09 22 350 8.6 -9 691.80 -52.3 -52.5 -52.4 69 -99 SPO 1997 04 05 09 23 350 8.1 -9 691.80 -52.3 -52.5 -52.4 69 -99 SPO 1997 04 05 09 24 351 8.3 -9 691.80 -52.3 -52.5 -52.4 69 -99 SPO 1997 04 05 09 25 349 8.5 -9 691.80 -52.3 -52.5 -52.4 68 -99 SPO 1997 04 05 09 26 350 8.3 -9 691.80 -52.3 -52.5 -52.4 68 -99 SPO 1997 04 05 09 27 349 8.7 -9 691.80 -52.3 -52.5 -52.4 67 -99 SPO 1997 04 05 09 28 347 8.4 -9 691.80 -52.2 -52.4 -52.3 66 -99 SPO 1997 04 05 09 29 348 8.8 -9 691.80 -52.2 -52.4 -52.3 67 -99 SPO 1997 04 05 09 30 351 8.3 -9 691.80 -52.2 -52.4 -52.3 68 -99 SPO 1997 04 05 09 31 350 8.4 -9 691.80 -52.2 -52.4 -52.3 68 -99 SPO 1997 04 05 09 32 351 8.2 -9 691.80 -52.2 -52.4 -52.3 68 -99 SPO 1997 04 05 09 33 351 8.2 -9 691.80 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 05 09 34 352 8.2 -9 691.80 -52.2 -52.5 -52.4 68 -99 SPO 1997 04 05 09 35 350 8.3 -9 691.80 -52.2 -52.6 -52.4 69 -99 SPO 1997 04 05 09 36 350 8.7 -9 691.80 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 05 09 37 350 8.2 -9 691.90 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 05 09 38 350 8.6 -9 691.90 -52.2 -52.5 -52.3 68 -99 SPO 1997 04 05 09 39 351 8.0 -9 691.90 -52.2 -52.4 -52.3 68 -99 SPO 1997 04 05 09 40 350 8.2 -9 692.00 -52.2 -52.4 -52.3 68 -99 SPO 1997 04 05 09 41 349 8.2 -9 692.00 -52.2 -52.4 -52.3 69 -99 SPO 1997 04 05 09 42 351 8.2 -9 692.00 -52.2 -52.4 -52.3 69 -99 SPO 1997 04 05 09 43 351 7.9 -9 692.00 -52.1 -52.4 -52.3 68 -99 SPO 1997 04 05 09 44 351 8.1 -9 692.00 -52.1 -52.4 -52.2 68 -99 SPO 1997 04 05 09 45 352 8.8 -9 691.90 -52.1 -52.4 -52.2 69 -99 SPO 1997 04 05 09 46 351 8.6 -9 692.00 -52.1 -52.4 -52.2 69 -99 SPO 1997 04 05 09 47 349 8.2 -9 692.00 -52.1 -52.3 -52.2 68 -99 SPO 1997 04 05 09 48 352 8.2 -9 692.00 -52.1 -52.3 -52.2 68 -99 SPO 1997 04 05 09 49 352 8.6 -9 692.00 -52.1 -52.2 -52.1 68 -99 SPO 1997 04 05 09 50 351 8.0 -9 692.00 -52.0 -52.2 -52.1 66 -99 SPO 1997 04 05 09 51 351 8.3 -9 692.00 -52.0 -52.2 -52.0 66 -99 SPO 1997 04 05 09 52 350 8.7 -9 691.90 -52.0 -52.2 -52.0 67 -99 SPO 1997 04 05 09 53 352 9.0 -9 691.90 -52.0 -52.1 -52.0 68 -99 SPO 1997 04 05 09 54 354 8.6 -9 691.90 -51.9 -51.9 -51.9 68 -99 SPO 1997 04 05 09 55 351 9.0 -9 691.90 -51.9 -51.9 -52.0 69 -99 SPO 1997 04 05 09 56 353 8.6 -9 691.90 -51.9 -51.8 -52.0 70 -99 SPO 1997 04 05 09 57 354 8.0 -9 691.90 -51.9 -51.9 -52.0 70 -99 SPO 1997 04 05 09 58 354 8.4 -9 691.90 -51.9 -51.9 -52.0 70 -99 SPO 1997 04 05 09 59 354 8.3 -9 691.90 -51.9 -51.9 -51.9 70 -99 SPO 1997 04 05 10 00 355 8.2 -9 691.90 -51.8 -51.8 -51.8 70 0 SPO 1997 04 05 10 01 352 8.7 -9 691.90 -51.8 -51.8 -51.8 70 -99 SPO 1997 04 05 10 02 354 8.7 -9 692.00 -51.7 -51.8 -51.8 69 -99 SPO 1997 04 05 10 03 354 8.4 -9 692.00 -51.7 -51.8 -51.8 69 -99 SPO 1997 04 05 10 04 354 8.8 -9 691.90 -51.7 -51.8 -51.8 69 -99 SPO 1997 04 05 10 05 354 7.7 -9 692.00 -51.7 -51.8 -51.8 69 -99 SPO 1997 04 05 10 06 352 8.4 -9 692.00 -51.7 -51.8 -51.8 69 -99 SPO 1997 04 05 10 07 353 8.4 -9 692.00 -51.7 -51.9 -51.8 70 -99 SPO 1997 04 05 10 08 354 8.5 -9 692.00 -51.7 -51.9 -51.8 70 -99 SPO 1997 04 05 10 09 354 8.0 -9 691.90 -51.7 -51.9 -51.7 70 -99 SPO 1997 04 05 10 10 351 8.4 -9 692.00 -51.6 -51.9 -51.7 69 -99 SPO 1997 04 05 10 11 351 8.3 -9 692.00 -51.6 -51.9 -51.7 69 -99 SPO 1997 04 05 10 12 352 8.3 -9 692.00 -51.6 -51.8 -51.6 70 -99 SPO 1997 04 05 10 13 353 8.1 -9 692.00 -51.5 -51.8 -51.6 69 -99 SPO 1997 04 05 10 14 353 8.2 -9 692.00 -51.5 -51.8 -51.6 69 -99 SPO 1997 04 05 10 15 354 8.7 -9 692.00 -51.5 -51.9 -51.7 69 -99 SPO 1997 04 05 10 16 353 8.2 -9 692.00 -51.5 -51.9 -51.7 70 -99 SPO 1997 04 05 10 17 353 8.2 -9 692.00 -51.5 -51.9 -51.6 70 -99 SPO 1997 04 05 10 18 353 8.3 -9 691.90 -51.5 -51.8 -51.6 70 -99 SPO 1997 04 05 10 19 353 8.6 -9 691.90 -51.5 -51.8 -51.6 70 -99 SPO 1997 04 05 10 20 355 8.7 -9 691.90 -51.5 -51.8 -51.6 70 -99 SPO 1997 04 05 10 21 354 8.8 -9 691.80 -51.4 -51.8 -51.6 70 -99 SPO 1997 04 05 10 22 353 9.0 -9 691.90 -51.4 -51.7 -51.6 70 -99 SPO 1997 04 05 10 23 353 8.7 -9 691.90 -51.4 -51.7 -51.5 70 -99 SPO 1997 04 05 10 24 354 9.0 -9 691.90 -51.4 -51.6 -51.5 69 -99 SPO 1997 04 05 10 25 354 8.7 -9 691.90 -51.4 -51.7 -51.5 69 -99 SPO 1997 04 05 10 26 355 8.3 -9 691.90 -51.4 -51.6 -51.4 69 -99 SPO 1997 04 05 10 27 356 8.4 -9 691.90 -51.4 -51.6 -51.5 69 -99 SPO 1997 04 05 10 28 354 8.0 -9 691.90 -51.4 -51.5 -51.4 70 -99 SPO 1997 04 05 10 29 356 8.5 -9 691.90 -51.3 -51.6 -51.4 70 -99 SPO 1997 04 05 10 30 354 8.8 -9 691.90 -51.3 -51.6 -51.4 71 -99 SPO 1997 04 05 10 31 354 8.3 -9 691.90 -51.2 -51.6 -51.3 70 -99 SPO 1997 04 05 10 32 353 8.2 -9 692.00 -51.2 -51.4 -51.2 70 -99 SPO 1997 04 05 10 33 352 8.0 -9 692.00 -51.2 -51.4 -51.2 70 -99 SPO 1997 04 05 10 34 354 8.2 -9 692.00 -51.2 -51.4 -51.2 71 -99 SPO 1997 04 05 10 35 353 8.1 -9 692.00 -51.1 -51.4 -51.2 70 -99 SPO 1997 04 05 10 36 354 7.8 -9 692.00 -51.1 -51.4 -51.2 69 -99 SPO 1997 04 05 10 37 354 8.4 -9 692.00 -51.1 -51.3 -51.2 70 -99 SPO 1997 04 05 10 38 352 7.9 -9 692.00 -51.1 -51.2 -51.2 70 -99 SPO 1997 04 05 10 39 352 8.3 -9 692.00 -51.1 -51.2 -51.1 70 -99 SPO 1997 04 05 10 40 351 8.5 -9 692.00 -51.0 -51.2 -51.1 70 -99 SPO 1997 04 05 10 41 352 8.6 -9 692.00 -51.0 -51.0 -51.0 70 -99 SPO 1997 04 05 10 42 352 8.4 -9 691.90 -51.0 -50.9 -51.0 71 -99 SPO 1997 04 05 10 43 352 8.5 -9 691.90 -51.0 -51.0 -51.1 71 -99 SPO 1997 04 05 10 44 349 8.6 -9 691.90 -51.0 -51.0 -51.1 71 -99 SPO 1997 04 05 10 45 351 8.6 -9 692.00 -50.9 -51.0 -51.0 71 -99 SPO 1997 04 05 10 46 350 8.7 -9 691.90 -50.9 -51.0 -51.0 71 -99 SPO 1997 04 05 10 47 351 8.2 -9 691.90 -50.9 -51.0 -51.0 71 -99 SPO 1997 04 05 10 48 353 8.4 -9 691.90 -51.0 -51.1 -51.1 71 -99 SPO 1997 04 05 10 49 351 8.4 -9 691.90 -51.0 -51.0 -51.0 70 -99 SPO 1997 04 05 10 50 350 8.2 -9 692.00 -51.0 -50.9 -51.0 70 -99 SPO 1997 04 05 10 51 351 8.4 -9 692.00 -50.9 -50.9 -51.1 69 -99 SPO 1997 04 05 10 52 351 8.4 -9 692.00 -50.9 -51.0 -51.1 69 -99 SPO 1997 04 05 10 53 354 8.4 -9 691.90 -51.0 -51.0 -51.1 70 -99 SPO 1997 04 05 10 54 353 8.7 -9 692.00 -51.0 -51.0 -51.2 70 -99 SPO 1997 04 05 10 55 354 9.0 -9 691.90 -51.0 -50.9 -51.2 70 -99 SPO 1997 04 05 10 56 350 9.1 -9 692.00 -51.0 -50.8 -51.0 70 -99 SPO 1997 04 05 10 57 351 8.4 -9 692.00 -51.0 -50.9 -51.2 70 -99 SPO 1997 04 05 10 58 350 7.7 -9 692.00 -51.1 -51.0 -51.2 71 -99 SPO 1997 04 05 10 59 353 8.0 -9 692.10 -51.1 -51.0 -51.2 71 -99 SPO 1997 04 05 11 00 350 7.5 -9 692.10 -51.1 -51.0 -51.2 70 0 SPO 1997 04 05 11 01 350 7.7 -9 692.10 -51.1 -51.0 -51.2 69 -99 SPO 1997 04 05 11 02 351 8.1 -9 692.00 -51.1 -50.8 -51.1 69 -99 SPO 1997 04 05 11 03 351 7.9 -9 692.10 -51.1 -50.9 -51.2 69 -99 SPO 1997 04 05 11 04 351 8.0 -9 692.00 -51.1 -51.1 -51.3 70 -99 SPO 1997 04 05 11 05 352 8.1 -9 692.00 -51.1 -51.3 -51.3 70 -99 SPO 1997 04 05 11 06 352 7.8 -9 692.00 -51.1 -51.3 -51.3 70 -99 SPO 1997 04 05 11 07 352 8.2 -9 692.00 -51.1 -51.3 -51.3 70 -99 SPO 1997 04 05 11 08 351 8.0 -9 692.00 -51.1 -51.2 -51.3 70 -99 SPO 1997 04 05 11 09 354 8.3 -9 692.00 -51.1 -51.3 -51.4 70 -99 SPO 1997 04 05 11 10 354 8.8 -9 692.00 -51.2 -51.3 -51.3 70 -99 SPO 1997 04 05 11 11 353 8.4 -9 692.00 -51.2 -51.3 -51.3 70 -99 SPO 1997 04 05 11 12 353 8.4 -9 692.00 -51.2 -51.2 -51.2 69 -99 SPO 1997 04 05 11 13 355 8.7 -9 692.00 -51.2 -51.2 -51.2 69 -99 SPO 1997 04 05 11 14 355 8.3 -9 692.00 -51.2 -51.2 -51.3 69 -99 SPO 1997 04 05 11 15 354 8.9 -9 692.00 -51.2 -51.1 -51.3 70 -99 SPO 1997 04 05 11 16 355 8.6 -9 692.00 -51.2 -51.1 -51.3 70 -99 SPO 1997 04 05 11 17 356 8.3 -9 692.10 -51.2 -51.2 -51.3 71 -99 SPO 1997 04 05 11 18 356 8.7 -9 692.00 -51.2 -51.2 -51.3 71 -99 SPO 1997 04 05 11 19 355 8.6 -9 692.10 -51.2 -51.2 -51.3 71 -99 SPO 1997 04 05 11 20 355 8.1 -9 692.10 -51.2 -51.2 -51.3 71 -99 SPO 1997 04 05 11 21 354 8.8 -9 692.10 -51.2 -51.1 -51.3 71 -99 SPO 1997 04 05 11 22 354 8.6 -9 692.10 -51.1 -51.1 -51.2 70 -99 SPO 1997 04 05 11 23 355 8.2 -9 692.10 -51.1 -51.2 -51.3 69 -99 SPO 1997 04 05 11 24 354 8.2 -9 692.20 -51.1 -51.2 -51.3 69 -99 SPO 1997 04 05 11 25 354 8.2 -9 692.20 -51.1 -51.3 -51.3 68 -99 SPO 1997 04 05 11 26 354 8.3 -9 692.20 -51.1 -51.3 -51.3 68 -99 SPO 1997 04 05 11 27 354 8.4 -9 692.20 -51.1 -51.2 -51.2 69 -99 SPO 1997 04 05 11 28 355 8.2 -9 692.20 -51.1 -51.2 -51.2 69 -99 SPO 1997 04 05 11 29 354 8.7 -9 692.20 -51.1 -51.2 -51.2 69 -99 SPO 1997 04 05 11 30 353 8.5 -9 692.20 -51.1 -51.2 -51.2 70 -99 SPO 1997 04 05 11 31 353 8.2 -9 692.20 -51.1 -51.2 -51.2 70 -99 SPO 1997 04 05 11 32 351 8.2 -9 692.20 -51.1 -51.2 -51.2 70 -99 SPO 1997 04 05 11 33 354 8.3 -9 692.20 -51.1 -51.1 -51.1 70 -99 SPO 1997 04 05 11 34 349 8.0 -9 692.20 -51.0 -51.1 -51.1 69 -99 SPO 1997 04 05 11 35 355 8.5 -9 692.20 -51.0 -51.0 -51.0 69 -99 SPO 1997 04 05 11 36 351 8.0 -9 692.20 -51.0 -50.9 -50.9 69 -99 SPO 1997 04 05 11 37 351 8.2 -9 692.30 -50.9 -51.0 -51.0 68 -99 SPO 1997 04 05 11 38 354 8.3 -9 692.30 -50.9 -51.0 -51.1 68 -99 SPO 1997 04 05 11 39 354 8.3 -9 692.30 -50.9 -51.0 -51.1 68 -99 SPO 1997 04 05 11 40 353 8.1 -9 692.30 -50.9 -51.0 -51.1 69 -99 SPO 1997 04 05 11 41 350 8.1 -9 692.40 -50.9 -51.0 -51.1 69 -99 SPO 1997 04 05 11 42 350 7.7 -9 692.40 -50.9 -51.1 -51.0 70 -99 SPO 1997 04 05 11 43 355 7.9 -9 692.40 -50.8 -51.1 -51.0 69 -99 SPO 1997 04 05 11 44 359 8.2 -9 692.40 -50.9 -51.1 -51.1 71 -99 SPO 1997 04 05 11 45 353 8.3 -9 692.40 -50.9 -51.1 -51.1 70 -99 SPO 1997 04 05 11 46 353 8.0 -9 692.40 -50.9 -51.1 -51.0 70 -99 SPO 1997 04 05 11 47 349 7.6 -9 692.40 -50.9 -51.0 -51.0 69 -99 SPO 1997 04 05 11 48 350 7.9 -9 692.40 -50.9 -51.0 -50.9 69 -99 SPO 1997 04 05 11 49 356 8.4 -9 692.40 -50.8 -50.9 -50.9 68 -99 SPO 1997 04 05 11 50 356 8.0 -9 692.40 -50.8 -50.7 -50.9 68 -99 SPO 1997 04 05 11 51 354 7.8 -9 692.40 -50.8 -50.7 -50.9 68 -99 SPO 1997 04 05 11 52 352 8.1 -9 692.40 -50.8 -50.8 -50.9 69 -99 SPO 1997 04 05 11 53 355 8.0 -9 692.40 -50.8 -50.9 -50.9 69 -99 SPO 1997 04 05 11 54 354 8.1 -9 692.40 -50.8 -50.9 -50.9 70 -99 SPO 1997 04 05 11 55 354 8.0 -9 692.50 -50.8 -50.9 -50.9 70 -99 SPO 1997 04 05 11 56 352 8.2 -9 692.40 -50.8 -50.8 -50.8 70 -99 SPO 1997 04 05 11 57 351 8.4 -9 692.40 -50.8 -50.9 -50.8 70 -99 SPO 1997 04 05 11 58 354 8.4 -9 692.30 -50.7 -50.9 -50.9 69 -99 SPO 1997 04 05 11 59 355 8.6 -9 692.30 -50.7 -51.0 -50.8 69 -99 SPO 1997 04 05 12 00 354 8.9 -9 692.30 -50.7 -51.0 -50.8 70 0 SPO 1997 04 05 12 01 358 8.6 -9 692.30 -50.7 -51.0 -50.8 70 -99 SPO 1997 04 05 12 02 355 9.2 -9 692.30 -50.8 -51.0 -50.9 71 -99 SPO 1997 04 05 12 03 356 8.9 -9 692.30 -50.8 -51.0 -50.9 71 -99 SPO 1997 04 05 12 04 354 8.8 -9 692.30 -50.7 -51.0 -50.8 70 -99 SPO 1997 04 05 12 05 356 8.9 -9 692.20 -50.7 -50.9 -50.8 70 -99 SPO 1997 04 05 12 06 356 8.6 -9 692.20 -50.7 -50.9 -50.8 71 -99 SPO 1997 04 05 12 07 356 8.7 -9 692.20 -50.7 -50.9 -50.8 71 -99 SPO 1997 04 05 12 08 356 9.1 -9 692.20 -50.7 -50.9 -50.8 71 -99 SPO 1997 04 05 12 09 356 9.3 -9 692.10 -50.7 -50.9 -50.8 71 -99 SPO 1997 04 05 12 10 356 9.8 -9 692.10 -50.7 -50.9 -50.8 70 -99 SPO 1997 04 05 12 11 356 9.4 -9 692.00 -50.7 -50.9 -50.8 70 -99 SPO 1997 04 05 12 12 359 9.6 -9 692.00 -50.7 -50.8 -50.8 70 -99 SPO 1997 04 05 12 13 358 9.8 -9 691.90 -50.6 -50.8 -50.8 69 -99 SPO 1997 04 05 12 14 358 10.0 -9 691.80 -50.6 -50.8 -50.8 69 -99 SPO 1997 04 05 12 15 356 9.7 -9 691.80 -50.6 -50.8 -50.7 69 -99 SPO 1997 04 05 12 16 358 9.9 -9 691.80 -50.6 -50.8 -50.7 70 -99 SPO 1997 04 05 12 17 356 9.9 -9 691.80 -50.6 -50.8 -50.8 70 -99 SPO 1997 04 05 12 18 354 9.6 -9 691.90 -50.6 -50.9 -50.7 71 -99 SPO 1997 04 05 12 19 356 10.4 -9 691.90 -50.5 -50.9 -50.7 70 -99 SPO 1997 04 05 12 20 354 10.0 -9 691.80 -50.6 -50.8 -50.7 71 -99 SPO 1997 04 05 12 21 352 9.6 -9 691.90 -50.6 -50.8 -50.7 71 -99 SPO 1997 04 05 12 22 351 9.6 -9 691.80 -50.6 -50.8 -50.6 71 -99 SPO 1997 04 05 12 23 351 9.9 -9 691.80 -50.5 -50.7 -50.6 70 -99 SPO 1997 04 05 12 24 350 9.7 -9 691.80 -50.5 -50.6 -50.5 70 -99 SPO 1997 04 05 12 25 351 10.0 -9 691.80 -50.5 -50.6 -50.5 70 -99 SPO 1997 04 05 12 26 354 10.2 -9 691.70 -50.4 -50.6 -50.5 69 -99 SPO 1997 04 05 12 27 350 9.8 -9 691.70 -50.4 -50.6 -50.5 69 -99 SPO 1997 04 05 12 28 353 9.9 -9 691.80 -50.4 -50.6 -50.5 70 -99 SPO 1997 04 05 12 29 348 9.6 -9 691.80 -50.4 -50.5 -50.5 70 -99 SPO 1997 04 05 12 30 349 9.6 -9 691.80 -50.4 -50.5 -50.5 70 -99 SPO 1997 04 05 12 31 347 9.3 -9 691.90 -50.4 -50.4 -50.5 71 -99 SPO 1997 04 05 12 32 346 9.3 -9 691.90 -50.4 -50.4 -50.4 70 -99 SPO 1997 04 05 12 33 349 9.4 -9 691.90 -50.3 -50.4 -50.4 69 -99 SPO 1997 04 05 12 34 349 9.7 -9 691.90 -50.3 -50.4 -50.4 68 -99 SPO 1997 04 05 12 35 348 9.3 -9 692.00 -50.3 -50.5 -50.4 69 -99 SPO 1997 04 05 12 36 346 8.9 -9 692.00 -50.3 -50.5 -50.4 69 -99 SPO 1997 04 05 12 37 349 8.8 -9 692.00 -50.3 -50.6 -50.4 69 -99 SPO 1997 04 05 12 38 346 9.1 -9 692.00 -50.3 -50.6 -50.4 70 -99 SPO 1997 04 05 12 39 347 8.7 -9 692.00 -50.3 -50.5 -50.4 71 -99 SPO 1997 04 05 12 40 346 8.8 -9 692.00 -50.3 -50.4 -50.4 71 -99 SPO 1997 04 05 12 41 347 8.7 -9 692.00 -50.3 -50.5 -50.3 72 -99 SPO 1997 04 05 12 42 347 9.3 -9 692.00 -50.2 -50.4 -50.3 71 -99 SPO 1997 04 05 12 43 345 8.5 -9 692.00 -50.2 -50.3 -50.3 72 -99 SPO 1997 04 05 12 44 346 9.1 -9 692.00 -50.2 -50.2 -50.3 72 -99 SPO 1997 04 05 12 45 344 9.0 -9 692.00 -50.2 -50.0 -50.2 71 -99 SPO 1997 04 05 12 46 346 9.2 -9 692.00 -50.2 -50.1 -50.2 70 -99 SPO 1997 04 05 12 47 345 9.9 -9 692.00 -50.1 -50.0 -50.2 69 -99 SPO 1997 04 05 12 48 346 9.7 -9 691.90 -50.1 -49.9 -50.1 69 -99 SPO 1997 04 05 12 49 346 9.7 -9 691.90 -50.0 -49.8 -50.0 68 -99 SPO 1997 04 05 12 50 346 9.2 -9 691.90 -50.0 -49.8 -49.9 69 -99 SPO 1997 04 05 12 51 346 9.4 -9 691.90 -49.9 -49.8 -50.1 68 -99 SPO 1997 04 05 12 52 345 9.4 -9 691.90 -49.9 -49.8 -49.9 69 -99 SPO 1997 04 05 12 53 347 9.3 -9 691.90 -49.8 -49.8 -50.0 68 -99 SPO 1997 04 05 12 54 345 9.4 -9 691.90 -49.9 -49.9 -50.0 70 -99 SPO 1997 04 05 12 55 346 9.2 -9 691.90 -49.9 -49.9 -50.0 71 -99 SPO 1997 04 05 12 56 345 8.6 -9 691.90 -50.0 -50.0 -50.1 72 -99 SPO 1997 04 05 12 57 347 8.3 -9 691.90 -50.0 -49.9 -50.1 72 -99 SPO 1997 04 05 12 58 346 8.4 -9 691.90 -50.0 -49.9 -50.1 71 -99 SPO 1997 04 05 12 59 347 8.7 -9 691.90 -50.0 -49.8 -50.0 71 -99 SPO 1997 04 05 13 00 345 9.4 -9 691.90 -50.0 -49.7 -50.0 70 0 SPO 1997 04 05 13 01 348 8.8 -9 691.90 -50.0 -49.8 -50.0 70 -99 SPO 1997 04 05 13 02 346 9.6 -9 691.90 -49.9 -49.7 -49.9 70 -99 SPO 1997 04 05 13 03 346 9.2 -9 691.90 -49.8 -49.5 -49.8 70 -99 SPO 1997 04 05 13 04 344 9.2 -9 691.90 -49.8 -49.6 -49.9 71 -99 SPO 1997 04 05 13 05 343 9.2 -9 691.90 -49.8 -49.4 -49.8 71 -99 SPO 1997 04 05 13 06 345 9.6 -9 691.90 -49.7 -49.4 -49.6 71 -99 SPO 1997 04 05 13 07 346 9.1 -9 691.90 -49.6 -49.6 -49.8 70 -99 SPO 1997 04 05 13 08 347 8.8 -9 691.80 -49.7 -49.7 -49.9 71 -99 SPO 1997 04 05 13 09 348 8.8 -9 691.90 -49.7 -49.8 -49.9 71 -99 SPO 1997 04 05 13 10 348 8.5 -9 691.90 -49.7 -49.7 -49.8 69 -99 SPO 1997 04 05 13 11 345 8.8 -9 691.90 -49.7 -49.7 -49.8 69 -99 SPO 1997 04 05 13 12 344 8.5 -9 692.00 -49.7 -49.7 -49.7 69 -99 SPO 1997 04 05 13 13 343 8.5 -9 692.00 -49.6 -49.6 -49.6 69 -99 SPO 1997 04 05 13 14 343 8.6 -9 692.00 -49.6 -49.5 -49.5 69 -99 SPO 1997 04 05 13 15 343 8.6 -9 692.00 -49.5 -49.4 -49.5 69 -99 SPO 1997 04 05 13 16 341 9.0 -9 692.00 -49.4 -49.2 -49.3 69 -99 SPO 1997 04 05 13 17 342 8.8 -9 692.00 -49.3 -49.1 -49.0 71 -99 SPO 1997 04 05 13 18 344 8.6 -9 692.00 -49.2 -49.1 -49.2 71 -99 SPO 1997 04 05 13 19 343 8.7 -9 692.00 -49.2 -49.1 -49.3 72 -99 SPO 1997 04 05 13 20 345 8.4 -9 692.00 -49.2 -49.1 -49.2 73 -99 SPO 1997 04 05 13 21 346 8.2 -9 692.00 -49.2 -49.2 -49.3 73 -99 SPO 1997 04 05 13 22 346 8.3 -9 692.10 -49.2 -49.3 -49.4 72 -99 SPO 1997 04 05 13 23 346 8.3 -9 692.10 -49.3 -49.3 -49.4 73 -99 SPO 1997 04 05 13 24 347 8.2 -9 692.00 -49.3 -49.3 -49.4 72 -99 SPO 1997 04 05 13 25 346 8.2 -9 692.00 -49.2 -49.2 -49.4 70 -99 SPO 1997 04 05 13 26 347 8.6 -9 692.00 -49.2 -49.2 -49.4 70 -99 SPO 1997 04 05 13 27 347 8.2 -9 692.00 -49.2 -49.3 -49.4 70 -99 SPO 1997 04 05 13 28 346 8.2 -9 692.00 -49.3 -49.3 -49.4 72 -99 SPO 1997 04 05 13 29 346 8.5 -9 692.00 -49.3 -49.2 -49.4 72 -99 SPO 1997 04 05 13 30 346 8.4 -9 692.10 -49.3 -49.3 -49.4 72 -99 SPO 1997 04 05 13 31 346 8.3 -9 692.10 -49.3 -49.3 -49.4 73 -99 SPO 1997 04 05 13 32 347 8.1 -9 692.10 -49.3 -49.4 -49.4 73 -99 SPO 1997 04 05 13 33 346 8.6 -9 692.10 -49.3 -49.4 -49.4 73 -99 SPO 1997 04 05 13 34 348 8.4 -9 692.00 -49.3 -49.4 -49.3 73 -99 SPO 1997 04 05 13 35 347 8.6 -9 692.00 -49.2 -49.3 -49.3 71 -99 SPO 1997 04 05 13 36 347 8.6 -9 692.00 -49.2 -49.2 -49.2 71 -99 SPO 1997 04 05 13 37 346 8.8 -9 692.00 -49.2 -49.2 -49.2 71 -99 SPO 1997 04 05 13 38 347 8.8 -9 691.90 -49.2 -49.2 -49.2 71 -99 SPO 1997 04 05 13 39 348 8.8 -9 691.90 -49.1 -49.2 -49.2 71 -99 SPO 1997 04 05 13 40 350 8.7 -9 691.90 -49.2 -49.3 -49.3 72 -99 SPO 1997 04 05 13 41 351 8.7 -9 691.90 -49.2 -49.3 -49.4 72 -99 SPO 1997 04 05 13 42 350 8.1 -9 692.00 -49.2 -49.4 -49.4 73 -99 SPO 1997 04 05 13 43 350 8.5 -9 692.00 -49.3 -49.4 -49.4 73 -99 SPO 1997 04 05 13 44 350 8.5 -9 692.00 -49.2 -49.4 -49.4 73 -99 SPO 1997 04 05 13 45 348 8.4 -9 692.00 -49.2 -49.4 -49.4 72 -99 SPO 1997 04 05 13 46 349 8.3 -9 691.90 -49.2 -49.3 -49.4 71 -99 SPO 1997 04 05 13 47 348 7.7 -9 692.00 -49.2 -49.2 -49.3 71 -99 SPO 1997 04 05 13 48 348 7.9 -9 692.00 -49.2 -49.2 -49.2 71 -99 SPO 1997 04 05 13 49 349 8.1 -9 692.10 -49.2 -49.1 -49.2 70 -99 SPO 1997 04 05 13 50 349 8.2 -9 692.10 -49.2 -49.1 -49.2 70 -99 SPO 1997 04 05 13 51 347 8.1 -9 692.10 -49.1 -49.0 -49.1 70 -99 SPO 1997 04 05 13 52 346 8.4 -9 692.10 -49.0 -49.0 -49.0 70 -99 SPO 1997 04 05 13 53 347 8.6 -9 692.10 -49.0 -48.9 -49.0 71 -99 SPO 1997 04 05 13 54 348 8.6 -9 692.10 -48.9 -48.9 -49.0 71 -99 SPO 1997 04 05 13 55 348 7.9 -9 692.20 -48.9 -49.0 -49.0 71 -99 SPO 1997 04 05 13 56 348 8.4 -9 692.20 -49.0 -49.0 -49.1 73 -99 SPO 1997 04 05 13 57 348 7.8 -9 692.20 -49.0 -49.1 -49.2 73 -99 SPO 1997 04 05 13 58 347 7.9 -9 692.20 -49.0 -49.1 -49.2 72 -99 SPO 1997 04 05 13 59 346 8.1 -9 692.20 -49.0 -49.1 -49.2 71 -99 SPO 1997 04 05 14 00 345 7.7 -9 692.20 -49.0 -49.0 -49.0 71 0 SPO 1997 04 05 14 01 345 8.1 -9 692.20 -49.0 -48.8 -48.9 70 -99 SPO 1997 04 05 14 02 344 8.3 -9 692.20 -48.9 -48.6 -48.7 70 -99 SPO 1997 04 05 14 03 343 8.7 -9 692.20 -48.8 -48.4 -48.5 71 -99 SPO 1997 04 05 14 04 343 9.1 -9 692.20 -48.6 -48.3 -48.3 71 -99 SPO 1997 04 05 14 05 342 8.8 -9 692.20 -48.4 -48.3 -48.3 71 -99 SPO 1997 04 05 14 06 345 8.6 -9 692.30 -48.4 -48.3 -48.3 72 -99 SPO 1997 04 05 14 07 347 8.6 -9 692.30 -48.3 -48.3 -48.3 72 -99 SPO 1997 04 05 14 08 347 8.5 -9 692.20 -48.3 -48.3 -48.4 72 -99 SPO 1997 04 05 14 09 346 8.8 -9 692.20 -48.3 -48.3 -48.3 72 -99 SPO 1997 04 05 14 10 344 8.7 -9 692.20 -48.2 -48.3 -48.2 71 -99 SPO 1997 04 05 14 11 345 8.7 -9 692.20 -48.2 -48.2 -48.2 71 -99 SPO 1997 04 05 14 12 345 8.7 -9 692.20 -48.1 -48.2 -48.2 70 -99 SPO 1997 04 05 14 13 346 9.1 -9 692.10 -48.1 -48.2 -48.2 70 -99 SPO 1997 04 05 14 14 345 9.1 -9 692.10 -48.1 -48.2 -48.2 70 -99 SPO 1997 04 05 14 15 346 8.9 -9 692.10 -48.1 -48.2 -48.2 70 -99 SPO 1997 04 05 14 16 347 9.2 -9 692.10 -48.1 -48.2 -48.2 72 -99 SPO 1997 04 05 14 17 346 8.9 -9 692.10 -48.1 -48.2 -48.2 72 -99 SPO 1997 04 05 14 18 345 9.2 -9 692.10 -48.1 -48.2 -48.2 72 -99 SPO 1997 04 05 14 19 347 9.3 -9 692.10 -48.1 -48.2 -48.2 72 -99 SPO 1997 04 05 14 20 344 9.1 -9 692.10 -48.1 -48.2 -48.2 73 -99 SPO 1997 04 05 14 21 340 9.1 -9 692.10 -48.1 -48.1 -48.1 74 -99 SPO 1997 04 05 14 22 343 9.5 -9 692.10 -48.0 -48.0 -48.0 72 -99 SPO 1997 04 05 14 23 348 9.0 -9 692.10 -48.0 -47.9 -47.9 72 -99 SPO 1997 04 05 14 24 345 8.7 -9 692.20 -47.9 -47.9 -48.1 71 -99 SPO 1997 04 05 14 25 343 8.4 -9 692.20 -48.0 -48.0 -48.1 72 -99 SPO 1997 04 05 14 26 345 8.5 -9 692.30 -48.0 -48.1 -48.1 71 -99 SPO 1997 04 05 14 27 343 8.4 -9 692.30 -48.0 -48.1 -48.1 71 -99 SPO 1997 04 05 14 28 346 8.5 -9 692.30 -48.0 -48.1 -48.1 72 -99 SPO 1997 04 05 14 29 349 8.5 -9 692.30 -48.0 -48.2 -48.1 72 -99 SPO 1997 04 05 14 30 343 8.7 -9 692.30 -48.0 -48.2 -48.1 72 -99 SPO 1997 04 05 14 31 344 8.3 -9 692.40 -48.0 -48.2 -48.1 72 -99 SPO 1997 04 05 14 32 347 8.0 -9 692.30 -48.0 -48.2 -48.0 72 -99 SPO 1997 04 05 14 33 348 8.3 -9 692.30 -48.0 -48.1 -48.0 73 -99 SPO 1997 04 05 14 34 345 8.2 -9 692.30 -47.9 -48.1 -48.0 71 -99 SPO 1997 04 05 14 35 344 7.8 -9 692.30 -47.9 -48.0 -48.0 71 -99 SPO 1997 04 05 14 36 345 8.1 -9 692.30 -47.9 -48.0 -47.9 71 -99 SPO 1997 04 05 14 37 343 7.9 -9 692.30 -47.9 -47.9 -47.9 71 -99 SPO 1997 04 05 14 38 342 8.5 -9 692.30 -47.8 -47.7 -47.8 70 -99 SPO 1997 04 05 14 39 341 8.6 -9 692.30 -47.7 -47.6 -47.6 71 -99 SPO 1997 04 05 14 40 346 8.5 -9 692.30 -47.6 -47.6 -47.6 71 -99 SPO 1997 04 05 14 41 345 8.5 -9 692.20 -47.6 -47.7 -47.8 71 -99 SPO 1997 04 05 14 42 342 9.8 -9 692.20 -47.7 -47.6 -47.7 73 -99 SPO 1997 04 05 14 43 345 8.6 -9 692.20 -47.6 -47.5 -47.6 73 -99 SPO 1997 04 05 14 44 348 8.3 -9 692.20 -47.6 -47.6 -47.8 73 -99 SPO 1997 04 05 14 45 351 8.4 -9 692.20 -47.6 -47.8 -47.8 73 -99 SPO 1997 04 05 14 46 347 8.0 -9 692.30 -47.7 -47.8 -47.8 74 -99 SPO 1997 04 05 14 47 346 7.9 -9 692.30 -47.7 -47.8 -47.8 72 -99 SPO 1997 04 05 14 48 346 8.0 -9 692.30 -47.7 -47.8 -47.8 71 -99 SPO 1997 04 05 14 49 343 7.9 -9 692.30 -47.7 -47.8 -47.7 71 -99 SPO 1997 04 05 14 50 344 8.0 -9 692.30 -47.7 -47.8 -47.7 70 -99 SPO 1997 04 05 14 51 343 8.3 -9 692.20 -47.6 -47.7 -47.6 70 -99 SPO 1997 04 05 14 52 343 7.9 -9 692.20 -47.6 -47.7 -47.6 70 -99 SPO 1997 04 05 14 53 343 7.9 -9 692.30 -47.6 -47.6 -47.6 71 -99 SPO 1997 04 05 14 54 341 7.9 -9 692.30 -47.6 -47.6 -47.5 71 -99 SPO 1997 04 05 14 55 341 8.1 -9 692.30 -47.5 -47.5 -47.4 72 -99 SPO 1997 04 05 14 56 341 8.0 -9 692.30 -47.4 -47.4 -47.4 71 -99 SPO 1997 04 05 14 57 342 8.2 -9 692.30 -47.4 -47.4 -47.4 72 -99 SPO 1997 04 05 14 58 345 7.8 -9 692.20 -47.3 -47.4 -47.3 71 -99 SPO 1997 04 05 14 59 343 7.9 -9 692.20 -47.3 -47.3 -47.3 71 -99 SPO 1997 04 05 15 00 344 8.0 -9 692.20 -47.2 -47.3 -47.3 70 0 SPO 1997 04 05 15 01 344 8.3 -9 692.20 -47.2 -47.3 -47.3 70 -99 SPO 1997 04 05 15 02 342 8.7 -9 692.30 -47.2 -47.3 -47.3 70 -99 SPO 1997 04 05 15 03 343 8.2 -9 692.30 -47.2 -47.3 -47.3 70 -99 SPO 1997 04 05 15 04 344 8.2 -9 692.30 -47.2 -47.3 -47.3 70 -99 SPO 1997 04 05 15 05 344 8.5 -9 692.20 -47.2 -47.2 -47.3 71 -99 SPO 1997 04 05 15 06 342 8.7 -9 692.20 -47.2 -47.3 -47.2 71 -99 SPO 1997 04 05 15 07 347 8.4 -9 692.20 -47.2 -47.3 -47.2 71 -99 SPO 1997 04 05 15 08 341 8.3 -9 692.30 -47.1 -47.3 -47.2 71 -99 SPO 1997 04 05 15 09 341 8.8 -9 692.30 -47.1 -47.3 -47.2 73 -99 SPO 1997 04 05 15 10 344 8.3 -9 692.20 -47.1 -47.3 -47.2 74 -99 SPO 1997 04 05 15 11 342 8.0 -9 692.20 -47.1 -47.3 -47.2 73 -99 SPO 1997 04 05 15 12 341 8.3 -9 692.20 -47.1 -47.3 -47.2 73 -99 SPO 1997 04 05 15 13 341 8.2 -9 692.30 -47.1 -47.3 -47.2 71 -99 SPO 1997 04 05 15 14 341 8.1 -9 692.30 -47.1 -47.3 -47.2 71 -99 SPO 1997 04 05 15 15 340 7.8 -9 692.30 -47.1 -47.2 -47.2 71 -99 SPO 1997 04 05 15 16 341 8.2 -9 692.30 -47.1 -47.2 -47.1 71 -99 SPO 1997 04 05 15 17 340 8.1 -9 692.30 -47.1 -47.1 -47.1 73 -99 SPO 1997 04 05 15 18 341 8.6 -9 692.30 -47.0 -47.1 -47.1 73 -99 SPO 1997 04 05 15 19 344 8.4 -9 692.30 -47.0 -47.1 -47.1 73 -99 SPO 1997 04 05 15 20 340 8.4 -9 692.30 -47.0 -47.1 -47.1 73 -99 SPO 1997 04 05 15 21 337 8.6 -9 692.30 -47.0 -47.1 -47.1 74 -99 SPO 1997 04 05 15 22 342 8.2 -9 692.30 -47.0 -47.1 -47.1 73 -99 SPO 1997 04 05 15 23 341 8.0 -9 692.30 -47.0 -47.1 -47.0 73 -99 SPO 1997 04 05 15 24 340 8.3 -9 692.30 -47.0 -47.1 -47.1 73 -99 SPO 1997 04 05 15 25 340 8.7 -9 692.30 -47.0 -47.0 -47.0 72 -99 SPO 1997 04 05 15 26 342 8.5 -9 692.30 -47.0 -47.0 -47.1 72 -99 SPO 1997 04 05 15 27 340 9.0 -9 692.30 -47.0 -47.0 -47.0 72 -99 SPO 1997 04 05 15 28 341 8.3 -9 692.40 -47.0 -47.1 -47.0 72 -99 SPO 1997 04 05 15 29 335 8.5 -9 692.40 -47.0 -47.1 -47.1 72 -99 SPO 1997 04 05 15 30 334 8.7 -9 692.40 -47.0 -47.0 -46.9 73 -99 SPO 1997 04 05 15 31 341 8.6 -9 692.30 -46.9 -47.0 -47.0 73 -99 SPO 1997 04 05 15 32 339 7.7 -9 692.40 -46.9 -47.1 -47.0 73 -99 SPO 1997 04 05 15 33 341 8.3 -9 692.40 -46.9 -47.1 -47.0 73 -99 SPO 1997 04 05 15 34 341 8.5 -9 692.30 -46.9 -47.1 -47.0 73 -99 SPO 1997 04 05 15 35 339 8.1 -9 692.40 -46.9 -47.0 -47.0 73 -99 SPO 1997 04 05 15 36 340 7.9 -9 692.40 -46.9 -47.0 -47.0 73 -99 SPO 1997 04 05 15 37 339 7.9 -9 692.40 -46.9 -47.0 -46.9 73 -99 SPO 1997 04 05 15 38 338 8.3 -9 692.40 -46.8 -46.9 -46.9 72 -99 SPO 1997 04 05 15 39 339 8.7 -9 692.30 -46.8 -46.9 -46.9 72 -99 SPO 1997 04 05 15 40 342 8.8 -9 692.30 -46.8 -46.8 -46.8 72 -99 SPO 1997 04 05 15 41 340 8.9 -9 692.30 -46.8 -46.8 -46.8 72 -99 SPO 1997 04 05 15 42 339 9.2 -9 692.30 -46.7 -46.8 -46.8 72 -99 SPO 1997 04 05 15 43 339 9.1 -9 692.30 -46.7 -46.8 -46.8 72 -99 SPO 1997 04 05 15 44 340 8.6 -9 692.30 -46.7 -46.8 -46.8 73 -99 SPO 1997 04 05 15 45 340 8.7 -9 692.30 -46.7 -46.7 -46.8 72 -99 SPO 1997 04 05 15 46 338 9.0 -9 692.30 -46.7 -46.8 -46.8 73 -99 SPO 1997 04 05 15 47 338 9.3 -9 692.30 -46.7 -46.8 -46.8 73 -99 SPO 1997 04 05 15 48 340 9.4 -9 692.30 -46.7 -46.8 -46.7 73 -99 SPO 1997 04 05 15 49 343 8.8 -9 692.30 -46.7 -46.8 -46.7 73 -99 SPO 1997 04 05 15 50 340 8.9 -9 692.30 -46.7 -46.8 -46.7 72 -99 SPO 1997 04 05 15 51 340 8.9 -9 692.30 -46.7 -46.8 -46.8 72 -99 SPO 1997 04 05 15 52 340 8.8 -9 692.30 -46.7 -46.8 -46.8 72 -99 SPO 1997 04 05 15 53 336 8.7 -9 692.30 -46.7 -46.8 -46.8 72 -99 SPO 1997 04 05 15 54 340 9.3 -9 692.30 -46.7 -46.7 -46.7 72 -99 SPO 1997 04 05 15 55 337 9.4 -9 692.30 -46.6 -46.6 -46.7 72 -99 SPO 1997 04 05 15 56 337 9.5 -9 692.30 -46.6 -46.4 -46.5 73 -99 SPO 1997 04 05 15 57 341 10.8 -9 692.20 -46.5 -46.3 -46.3 73 -99 SPO 1997 04 05 15 58 336 9.9 -9 692.20 -46.4 -46.3 -46.4 73 -99 SPO 1997 04 05 15 59 338 9.2 -9 692.30 -46.4 -46.4 -46.5 74 -99 SPO 1997 04 05 16 00 338 8.9 -9 692.30 -46.4 -46.4 -46.6 74 0 SPO 1997 04 05 16 01 335 8.8 -9 692.30 -46.4 -46.4 -46.5 74 -99 SPO 1997 04 05 16 02 335 8.6 -9 692.30 -46.4 -46.4 -46.5 72 -99 SPO 1997 04 05 16 03 333 9.2 -9 692.30 -46.4 -46.5 -46.5 72 -99 SPO 1997 04 05 16 04 338 9.4 -9 692.30 -46.4 -46.4 -46.5 72 -99 SPO 1997 04 05 16 05 339 9.2 -9 692.30 -46.4 -46.4 -46.5 72 -99 SPO 1997 04 05 16 06 338 9.4 -9 692.20 -46.4 -46.4 -46.5 72 -99 SPO 1997 04 05 16 07 336 9.8 -9 692.20 -46.4 -46.4 -46.5 72 -99 SPO 1997 04 05 16 08 336 9.7 -9 692.30 -46.4 -46.4 -46.4 72 -99 SPO 1997 04 05 16 09 335 10.3 -9 692.30 -46.4 -46.4 -46.3 74 -99 SPO 1997 04 05 16 10 335 10.0 -9 692.30 -46.3 -46.3 -46.3 73 -99 SPO 1997 04 05 16 11 337 9.8 -9 692.30 -46.3 -46.3 -46.2 73 -99 SPO 1997 04 05 16 12 336 9.4 -9 692.30 -46.2 -46.4 -46.4 73 -99 SPO 1997 04 05 16 13 339 9.4 -9 692.30 -46.3 -46.4 -46.4 75 -99 SPO 1997 04 05 16 14 337 9.4 -9 692.20 -46.3 -46.4 -46.4 74 -99 SPO 1997 04 05 16 15 335 9.6 -9 692.30 -46.3 -46.4 -46.4 73 -99 SPO 1997 04 05 16 16 336 9.5 -9 692.30 -46.3 -46.3 -46.3 73 -99 SPO 1997 04 05 16 17 339 9.3 -9 692.30 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 05 16 18 339 9.8 -9 692.20 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 05 16 19 337 9.6 -9 692.20 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 05 16 20 339 9.7 -9 692.20 -46.2 -46.3 -46.3 73 -99 SPO 1997 04 05 16 21 339 10.0 -9 692.20 -46.2 -46.2 -46.3 73 -99 SPO 1997 04 05 16 22 337 9.9 -9 692.20 -46.2 -46.2 -46.3 73 -99 SPO 1997 04 05 16 23 339 9.9 -9 692.20 -46.2 -46.1 -46.3 74 -99 SPO 1997 04 05 16 24 339 9.8 -9 692.20 -46.2 -46.2 -46.3 74 -99 SPO 1997 04 05 16 25 343 10.1 -9 692.10 -46.2 -46.1 -46.3 74 -99 SPO 1997 04 05 16 26 343 9.9 -9 692.10 -46.2 -46.1 -46.3 72 -99 SPO 1997 04 05 16 27 343 9.8 -9 692.10 -46.2 -46.2 -46.3 72 -99 SPO 1997 04 05 16 28 336 9.8 -9 692.20 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 05 16 29 332 10.1 -9 692.20 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 05 16 30 343 9.4 -9 692.20 -46.2 -46.3 -46.3 72 -99 SPO 1997 04 05 16 31 339 9.4 -9 692.20 -46.2 -46.2 -46.2 73 -99 SPO 1997 04 05 16 32 337 9.2 -9 692.30 -46.2 -46.3 -46.3 74 -99 SPO 1997 04 05 16 33 335 9.9 -9 692.30 -46.2 -46.3 -46.3 75 -99 SPO 1997 04 05 16 34 345 9.4 -9 692.20 -46.2 -46.2 -46.3 75 -99 SPO 1997 04 05 16 35 337 9.8 -9 692.20 -46.2 -46.2 -46.2 74 -99 SPO 1997 04 05 16 36 334 9.4 -9 692.30 -46.2 -46.2 -46.2 74 -99 SPO 1997 04 05 16 37 339 9.7 -9 692.20 -46.2 -46.2 -46.2 74 -99 SPO 1997 04 05 16 38 341 9.2 -9 692.30 -46.2 -46.2 -46.2 73 -99 SPO 1997 04 05 16 39 335 9.3 -9 692.30 -46.2 -46.2 -46.2 73 -99 SPO 1997 04 05 16 40 335 9.4 -9 692.30 -46.1 -46.2 -46.2 72 -99 SPO 1997 04 05 16 41 337 9.5 -9 692.30 -46.1 -46.2 -46.2 72 -99 SPO 1997 04 05 16 42 337 9.8 -9 692.30 -46.1 -46.2 -46.2 71 -99 SPO 1997 04 05 16 43 339 9.5 -9 692.20 -46.1 -46.2 -46.2 72 -99 SPO 1997 04 05 16 44 333 9.7 -9 692.30 -46.1 -46.1 -46.2 72 -99 SPO 1997 04 05 16 45 336 9.6 -9 692.30 -46.1 -46.1 -46.2 73 -99 SPO 1997 04 05 16 46 336 9.7 -9 692.30 -46.1 -46.1 -46.2 73 -99 SPO 1997 04 05 16 47 335 10.4 -9 692.20 -46.1 -46.0 -46.1 73 -99 SPO 1997 04 05 16 48 334 10.2 -9 692.20 -46.0 -46.0 -45.9 73 -99 SPO 1997 04 05 16 49 337 10.0 -9 692.20 -46.0 -46.0 -46.0 74 -99 SPO 1997 04 05 16 50 336 10.1 -9 692.20 -46.0 -46.0 -46.1 74 -99 SPO 1997 04 05 16 51 336 10.4 -9 692.20 -46.0 -46.0 -46.0 73 -99 SPO 1997 04 05 16 52 336 9.8 -9 692.20 -45.9 -46.0 -45.9 73 -99 SPO 1997 04 05 16 53 335 10.0 -9 692.10 -45.9 -46.0 -45.9 73 -99 SPO 1997 04 05 16 54 334 9.7 -9 692.20 -45.9 -46.0 -46.0 73 -99 SPO 1997 04 05 16 55 335 9.8 -9 692.20 -45.9 -46.0 -46.1 73 -99 SPO 1997 04 05 16 56 338 9.7 -9 692.10 -45.9 -46.0 -46.0 73 -99 SPO 1997 04 05 16 57 341 9.7 -9 692.10 -45.9 -45.8 -46.0 73 -99 SPO 1997 04 05 16 58 337 9.5 -9 692.10 -45.9 -45.8 -46.0 74 -99 SPO 1997 04 05 16 59 336 10.2 -9 692.10 -45.9 -45.8 -46.0 75 -99 SPO 1997 04 05 17 00 336 10.0 -9 692.10 -45.9 -45.9 -45.9 75 0 SPO 1997 04 05 17 01 337 10.3 -9 692.00 -45.8 -45.8 -45.9 74 -99 SPO 1997 04 05 17 02 340 10.0 -9 692.00 -45.8 -45.7 -45.9 74 -99 SPO 1997 04 05 17 03 335 9.6 -9 692.00 -45.8 -45.8 -46.0 74 -99 SPO 1997 04 05 17 04 337 9.7 -9 692.10 -45.8 -45.8 -46.0 73 -99 SPO 1997 04 05 17 05 338 10.3 -9 692.00 -45.8 -45.8 -45.9 73 -99 SPO 1997 04 05 17 06 336 10.4 -9 692.00 -45.8 -45.7 -45.8 72 -99 SPO 1997 04 05 17 07 336 9.9 -9 692.00 -45.8 -45.7 -45.8 72 -99 SPO 1997 04 05 17 08 334 10.5 -9 692.00 -45.7 -45.7 -45.8 73 -99 SPO 1997 04 05 17 09 334 10.4 -9 692.10 -45.7 -45.7 -45.8 73 -99 SPO 1997 04 05 17 10 337 9.5 -9 692.00 -45.7 -45.7 -45.8 73 -99 SPO 1997 04 05 17 11 335 10.2 -9 692.00 -45.7 -45.7 -45.7 74 -99 SPO 1997 04 05 17 12 334 10.0 -9 692.10 -45.6 -45.7 -45.7 73 -99 SPO 1997 04 05 17 13 336 9.9 -9 692.10 -45.6 -45.7 -45.8 74 -99 SPO 1997 04 05 17 14 335 9.8 -9 692.10 -45.7 -45.7 -45.7 75 -99 SPO 1997 04 05 17 15 334 10.4 -9 692.10 -45.6 -45.6 -45.7 74 -99 SPO 1997 04 05 17 16 338 9.5 -9 692.10 -45.6 -45.6 -45.7 73 -99 SPO 1997 04 05 17 17 335 9.4 -9 692.20 -45.6 -45.5 -45.6 73 -99 SPO 1997 04 05 17 18 332 9.8 -9 692.20 -45.5 -45.5 -45.6 72 -99 SPO 1997 04 05 17 19 338 10.0 -9 692.20 -45.5 -45.4 -45.6 71 -99 SPO 1997 04 05 17 20 335 10.1 -9 692.20 -45.5 -45.2 -45.5 72 -99 SPO 1997 04 05 17 21 333 9.8 -9 692.20 -45.5 -45.4 -45.6 73 -99 SPO 1997 04 05 17 22 335 10.0 -9 692.20 -45.5 -45.4 -45.6 73 -99 SPO 1997 04 05 17 23 334 10.0 -9 692.10 -45.5 -45.4 -45.5 74 -99 SPO 1997 04 05 17 24 335 10.2 -9 692.10 -45.4 -45.4 -45.5 73 -99 SPO 1997 04 05 17 25 334 10.3 -9 692.20 -45.4 -45.4 -45.5 73 -99 SPO 1997 04 05 17 26 335 10.2 -9 692.10 -45.4 -45.4 -45.5 73 -99 SPO 1997 04 05 17 27 334 10.4 -9 692.10 -45.4 -45.4 -45.5 73 -99 SPO 1997 04 05 17 28 334 10.5 -9 692.10 -45.4 -45.4 -45.4 73 -99 SPO 1997 04 05 17 29 332 9.8 -9 692.10 -45.4 -45.4 -45.4 73 -99 SPO 1997 04 05 17 30 335 10.0 -9 692.10 -45.3 -45.4 -45.4 71 -99 SPO 1997 04 05 17 31 334 10.2 -9 692.10 -45.3 -45.4 -45.4 71 -99 SPO 1997 04 05 17 32 332 11.0 -9 692.00 -45.3 -45.4 -45.3 71 -99 SPO 1997 04 05 17 33 333 10.3 -9 692.10 -45.3 -45.4 -45.4 72 -99 SPO 1997 04 05 17 34 332 10.2 -9 692.10 -45.3 -45.4 -45.4 73 -99 SPO 1997 04 05 17 35 332 10.1 -9 692.00 -45.3 -45.3 -45.3 73 -99 SPO 1997 04 05 17 36 331 10.5 -9 692.00 -45.3 -45.3 -45.3 74 -99 SPO 1997 04 05 17 37 332 10.0 -9 692.10 -45.2 -45.2 -45.2 73 -99 SPO 1997 04 05 17 38 330 10.6 -9 692.00 -45.2 -45.2 -45.1 73 -99 SPO 1997 04 05 17 39 332 10.3 -9 692.00 -45.1 -45.0 -45.0 74 -99 SPO 1997 04 05 17 40 333 10.2 -9 692.00 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 05 17 41 331 10.8 -9 692.00 -45.0 -44.9 -45.0 73 -99 SPO 1997 04 05 17 42 334 11.3 -9 692.00 -44.9 -44.8 -44.9 72 -99 SPO 1997 04 05 17 43 334 10.4 -9 692.00 -44.9 -44.8 -44.9 72 -99 SPO 1997 04 05 17 44 332 10.1 -9 692.10 -44.9 -44.9 -45.1 72 -99 SPO 1997 04 05 17 45 332 10.9 -9 692.10 -45.0 -44.9 -45.2 73 -99 SPO 1997 04 05 17 46 331 10.7 -9 692.10 -45.0 -44.9 -45.1 73 -99 SPO 1997 04 05 17 47 332 10.4 -9 692.10 -45.0 -45.0 -45.1 74 -99 SPO 1997 04 05 17 48 332 10.2 -9 692.20 -45.0 -45.0 -45.1 75 -99 SPO 1997 04 05 17 49 332 10.1 -9 692.10 -45.0 -45.1 -45.1 75 -99 SPO 1997 04 05 17 50 331 10.0 -9 692.10 -45.0 -45.1 -45.1 75 -99 SPO 1997 04 05 17 51 332 10.3 -9 692.10 -45.0 -45.1 -45.1 76 -99 SPO 1997 04 05 17 52 331 10.2 -9 692.10 -45.0 -45.2 -45.2 76 -99 SPO 1997 04 05 17 53 331 10.5 -9 692.20 -45.0 -45.2 -45.2 75 -99 SPO 1997 04 05 17 54 333 10.4 -9 692.10 -45.1 -45.2 -45.2 75 -99 SPO 1997 04 05 17 55 330 10.0 -9 692.10 -45.1 -45.1 -45.2 74 -99 SPO 1997 04 05 17 56 331 10.2 -9 692.10 -45.1 -45.2 -45.2 74 -99 SPO 1997 04 05 17 57 330 10.7 -9 692.10 -45.1 -45.2 -45.2 73 -99 SPO 1997 04 05 17 58 331 10.4 -9 692.10 -45.1 -45.1 -45.2 73 -99 SPO 1997 04 05 17 59 332 10.6 -9 692.20 -45.1 -45.2 -45.2 74 -99 SPO 1997 04 05 18 00 330 10.5 -9 692.20 -45.1 -45.2 -45.2 75 0 SPO 1997 04 05 18 01 331 10.1 -9 692.20 -45.1 -45.1 -45.2 76 -99 SPO 1997 04 05 18 02 332 10.5 -9 692.20 -45.1 -45.1 -45.2 76 -99 SPO 1997 04 05 18 03 332 10.4 -9 692.20 -45.1 -45.1 -45.2 76 -99 SPO 1997 04 05 18 04 332 10.4 -9 692.20 -45.1 -45.1 -45.2 75 -99 SPO 1997 04 05 18 05 332 10.2 -9 692.20 -45.1 -45.1 -45.2 75 -99 SPO 1997 04 05 18 06 331 10.3 -9 692.30 -45.1 -45.1 -45.2 74 -99 SPO 1997 04 05 18 07 331 9.8 -9 692.30 -45.1 -45.1 -45.2 73 -99 SPO 1997 04 05 18 08 332 10.5 -9 692.30 -45.1 -45.2 -45.2 73 -99 SPO 1997 04 05 18 09 332 9.7 -9 692.30 -45.1 -45.2 -45.2 72 -99 SPO 1997 04 05 18 10 331 10.2 -9 692.30 -45.1 -45.3 -45.2 73 -99 SPO 1997 04 05 18 11 330 10.4 -9 692.30 -45.1 -45.3 -45.2 74 -99 SPO 1997 04 05 18 12 331 10.2 -9 692.30 -45.1 -45.3 -45.2 74 -99 SPO 1997 04 05 18 13 331 9.9 -9 692.30 -45.1 -45.3 -45.2 74 -99 SPO 1997 04 05 18 14 330 10.1 -9 692.30 -45.1 -45.2 -45.2 75 -99 SPO 1997 04 05 18 15 330 10.1 -9 692.30 -45.1 -45.2 -45.2 75 -99 SPO 1997 04 05 18 16 330 10.4 -9 692.30 -45.1 -45.2 -45.2 75 -99 SPO 1997 04 05 18 17 331 10.2 -9 692.30 -45.1 -45.1 -45.1 75 -99 SPO 1997 04 05 18 18 331 10.3 -9 692.30 -45.0 -45.1 -45.1 73 -99 SPO 1997 04 05 18 19 331 10.2 -9 692.20 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 05 18 20 331 10.1 -9 692.30 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 05 18 21 331 10.5 -9 692.30 -45.0 -45.0 -45.1 72 -99 SPO 1997 04 05 18 22 331 10.1 -9 692.30 -45.0 -45.1 -45.1 73 -99 SPO 1997 04 05 18 23 332 9.8 -9 692.30 -45.0 -45.1 -45.2 74 -99 SPO 1997 04 05 18 24 330 10.0 -9 692.30 -45.0 -45.1 -45.2 75 -99 SPO 1997 04 05 18 25 330 10.2 -9 692.30 -45.1 -45.1 -45.2 75 -99 SPO 1997 04 05 18 26 330 10.1 -9 692.30 -45.0 -45.1 -45.2 74 -99 SPO 1997 04 05 18 27 331 10.2 -9 692.30 -45.0 -45.1 -45.1 73 -99 SPO 1997 04 05 18 28 330 10.0 -9 692.30 -45.0 -45.1 -45.1 74 -99 SPO 1997 04 05 18 29 330 10.0 -9 692.30 -45.0 -45.2 -45.1 74 -99 SPO 1997 04 05 18 30 329 9.9 -9 692.30 -45.0 -45.2 -45.1 74 -99 SPO 1997 04 05 18 31 329 10.5 -9 692.20 -45.0 -45.2 -45.1 73 -99 SPO 1997 04 05 18 32 329 10.2 -9 692.20 -45.0 -45.1 -45.0 72 -99 SPO 1997 04 05 18 33 329 10.2 -9 692.20 -44.9 -45.1 -45.0 71 -99 SPO 1997 04 05 18 34 329 10.1 -9 692.20 -44.9 -45.1 -45.0 71 -99 SPO 1997 04 05 18 35 329 9.7 -9 692.30 -44.9 -45.0 -45.0 72 -99 SPO 1997 04 05 18 36 330 9.8 -9 692.20 -45.0 -45.1 -45.0 74 -99 SPO 1997 04 05 18 37 330 10.0 -9 692.20 -45.0 -45.1 -45.0 77 -99 SPO 1997 04 05 18 38 331 10.1 -9 692.20 -45.0 -45.1 -45.1 79 -99 SPO 1997 04 05 18 39 331 10.1 -9 692.20 -45.0 -45.1 -45.1 80 -99 SPO 1997 04 05 18 40 332 9.8 -9 692.20 -45.0 -45.1 -45.1 79 -99 SPO 1997 04 05 18 41 330 10.3 -9 692.20 -45.0 -45.1 -45.1 79 -99 SPO 1997 04 05 18 42 331 9.7 -9 692.30 -45.0 -45.1 -45.1 78 -99 SPO 1997 04 05 18 43 331 9.6 -9 692.20 -45.0 -45.1 -45.1 77 -99 SPO 1997 04 05 18 44 330 10.0 -9 692.30 -45.0 -45.0 -45.1 75 -99 SPO 1997 04 05 18 45 330 9.5 -9 692.30 -45.0 -45.0 -45.1 74 -99 SPO 1997 04 05 18 46 330 9.6 -9 692.30 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 05 18 47 330 9.4 -9 692.30 -45.0 -45.0 -45.1 73 -99 SPO 1997 04 05 18 48 329 9.6 -9 692.30 -45.0 -45.1 -45.1 73 -99 SPO 1997 04 05 18 49 329 9.6 -9 692.30 -45.0 -45.1 -45.1 75 -99 SPO 1997 04 05 18 50 329 9.4 -9 692.30 -45.0 -45.1 -45.1 75 -99 SPO 1997 04 05 18 51 328 9.6 -9 692.30 -45.0 -45.2 -45.1 75 -99 SPO 1997 04 05 18 52 328 9.0 -9 692.40 -44.9 -45.2 -45.1 74 -99 SPO 1997 04 05 18 53 328 9.4 -9 692.40 -45.0 -45.2 -45.1 76 -99 SPO 1997 04 05 18 54 328 9.5 -9 692.30 -45.0 -45.2 -45.1 76 -99 SPO 1997 04 05 18 55 329 9.6 -9 692.30 -44.9 -45.1 -45.1 74 -99 SPO 1997 04 05 18 56 328 9.9 -9 692.20 -45.0 -45.1 -45.1 74 -99 SPO 1997 04 05 18 57 328 9.8 -9 692.20 -45.0 -45.1 -45.1 73 -99 SPO 1997 04 05 18 58 329 10.2 -9 692.20 -45.0 -45.1 -45.1 72 -99 SPO 1997 04 05 18 59 329 9.5 -9 692.20 -45.0 -45.1 -45.1 72 -99 SPO 1997 04 05 19 00 329 9.5 -9 692.20 -45.0 -45.1 -45.1 73 0 SPO 1997 04 05 19 01 329 9.7 -9 692.20 -45.0 -45.1 -45.1 74 -99 SPO 1997 04 05 19 02 329 9.5 -9 692.20 -45.0 -45.1 -45.1 75 -99 SPO 1997 04 05 19 03 329 9.7 -9 692.20 -45.0 -45.1 -45.0 76 -99 SPO 1997 04 05 19 04 328 9.8 -9 692.20 -45.0 -45.0 -45.0 76 -99 SPO 1997 04 05 19 05 328 9.6 -9 692.20 -45.0 -45.0 -45.0 77 -99 SPO 1997 04 05 19 06 329 9.8 -9 692.20 -44.9 -45.0 -45.0 76 -99 SPO 1997 04 05 19 07 328 9.7 -9 692.30 -44.9 -45.0 -45.0 76 -99 SPO 1997 04 05 19 08 327 9.3 -9 692.30 -44.9 -45.0 -45.0 75 -99 SPO 1997 04 05 19 09 328 9.7 -9 692.30 -44.9 -45.0 -45.0 74 -99 SPO 1997 04 05 19 10 328 9.8 -9 692.20 -44.9 -45.0 -45.0 74 -99 SPO 1997 04 05 19 11 328 9.7 -9 692.20 -44.8 -45.0 -44.9 73 -99 SPO 1997 04 05 19 12 328 9.7 -9 692.10 -44.8 -45.0 -44.9 73 -99 SPO 1997 04 05 19 13 329 9.7 -9 692.00 -44.8 -45.0 -44.9 74 -99 SPO 1997 04 05 19 14 328 9.9 -9 692.00 -44.8 -45.0 -44.9 74 -99 SPO 1997 04 05 19 15 328 9.8 -9 692.00 -44.8 -45.0 -44.9 74 -99 SPO 1997 04 05 19 16 329 9.8 -9 692.00 -44.8 -44.9 -44.9 75 -99 SPO 1997 04 05 19 17 329 10.2 -9 692.00 -44.8 -44.9 -44.9 75 -99 SPO 1997 04 05 19 18 329 10.1 -9 692.00 -44.8 -44.9 -44.8 76 -99 SPO 1997 04 05 19 19 329 10.1 -9 692.00 -44.8 -44.9 -44.8 76 -99 SPO 1997 04 05 19 20 330 9.8 -9 692.00 -44.7 -44.8 -44.8 75 -99 SPO 1997 04 05 19 21 330 10.1 -9 692.00 -44.8 -44.8 -44.8 75 -99 SPO 1997 04 05 19 22 331 10.3 -9 691.90 -44.8 -44.8 -44.8 74 -99 SPO 1997 04 05 19 23 330 10.4 -9 691.90 -44.7 -44.8 -44.8 73 -99 SPO 1997 04 05 19 24 329 10.3 -9 691.90 -44.7 -44.8 -44.8 73 -99 SPO 1997 04 05 19 25 329 10.3 -9 691.90 -44.7 -44.7 -44.8 73 -99 SPO 1997 04 05 19 26 328 10.1 -9 691.90 -44.7 -44.6 -44.7 74 -99 SPO 1997 04 05 19 27 328 10.3 -9 691.90 -44.6 -44.6 -44.7 74 -99 SPO 1997 04 05 19 28 328 10.0 -9 691.90 -44.6 -44.6 -44.6 74 -99 SPO 1997 04 05 19 29 328 9.8 -9 692.00 -44.6 -44.6 -44.6 74 -99 SPO 1997 04 05 19 30 328 9.9 -9 692.00 -44.6 -44.6 -44.7 74 -99 SPO 1997 04 05 19 31 328 9.5 -9 692.00 -44.6 -44.7 -44.6 74 -99 SPO 1997 04 05 19 32 329 9.9 -9 692.00 -44.5 -44.7 -44.7 74 -99 SPO 1997 04 05 19 33 329 10.1 -9 692.00 -44.6 -44.7 -44.7 75 -99 SPO 1997 04 05 19 34 327 9.8 -9 692.00 -44.6 -44.7 -44.7 74 -99 SPO 1997 04 05 19 35 327 9.9 -9 692.00 -44.6 -44.7 -44.6 74 -99 SPO 1997 04 05 19 36 326 9.6 -9 692.00 -44.6 -44.7 -44.6 74 -99 SPO 1997 04 05 19 37 327 9.7 -9 692.00 -44.6 -44.7 -44.6 74 -99 SPO 1997 04 05 19 38 327 9.7 -9 692.00 -44.5 -44.6 -44.6 73 -99 SPO 1997 04 05 19 39 327 9.6 -9 692.00 -44.6 -44.6 -44.6 74 -99 SPO 1997 04 05 19 40 328 9.4 -9 692.10 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 05 19 41 327 9.5 -9 692.10 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 05 19 42 328 9.3 -9 692.20 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 05 19 43 328 9.3 -9 692.20 -44.5 -44.5 -44.6 75 -99 SPO 1997 04 05 19 44 328 8.8 -9 692.20 -44.5 -44.6 -44.6 75 -99 SPO 1997 04 05 19 45 328 9.6 -9 692.20 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 19 46 328 9.1 -9 692.20 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 19 47 328 9.1 -9 692.20 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 19 48 328 9.0 -9 692.20 -44.4 -44.5 -44.6 73 -99 SPO 1997 04 05 19 49 329 8.9 -9 692.30 -44.5 -44.5 -44.6 73 -99 SPO 1997 04 05 19 50 329 9.2 -9 692.30 -44.5 -44.5 -44.6 73 -99 SPO 1997 04 05 19 51 329 8.9 -9 692.20 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 05 19 52 329 9.0 -9 692.20 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 05 19 53 328 9.1 -9 692.10 -44.4 -44.6 -44.6 74 -99 SPO 1997 04 05 19 54 328 9.1 -9 692.10 -44.5 -44.6 -44.6 75 -99 SPO 1997 04 05 19 55 327 9.5 -9 692.10 -44.5 -44.6 -44.6 76 -99 SPO 1997 04 05 19 56 328 9.2 -9 692.10 -44.5 -44.6 -44.5 75 -99 SPO 1997 04 05 19 57 329 9.6 -9 692.00 -44.5 -44.6 -44.5 75 -99 SPO 1997 04 05 19 58 329 9.4 -9 692.00 -44.4 -44.6 -44.6 74 -99 SPO 1997 04 05 19 59 328 9.4 -9 691.90 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 20 00 328 9.4 -9 692.00 -44.5 -44.5 -44.6 74 0 SPO 1997 04 05 20 01 328 9.3 -9 692.00 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 20 02 329 9.4 -9 692.00 -44.5 -44.5 -44.6 73 -99 SPO 1997 04 05 20 03 330 9.0 -9 692.00 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 20 04 330 8.7 -9 692.00 -44.5 -44.6 -44.6 74 -99 SPO 1997 04 05 20 05 331 8.8 -9 692.00 -44.5 -44.5 -44.6 74 -99 SPO 1997 04 05 20 06 330 9.0 -9 692.10 -44.5 -44.5 -44.6 75 -99 SPO 1997 04 05 20 07 330 8.6 -9 692.10 -44.5 -44.5 -44.6 75 -99 SPO 1997 04 05 20 08 330 8.8 -9 692.10 -44.5 -44.5 -44.6 75 -99 SPO 1997 04 05 20 09 330 8.5 -9 692.10 -44.5 -44.5 -44.5 75 -99 SPO 1997 04 05 20 10 331 8.4 -9 692.20 -44.4 -44.4 -44.5 74 -99 SPO 1997 04 05 20 11 331 8.3 -9 692.20 -44.4 -44.5 -44.5 74 -99 SPO 1997 04 05 20 12 332 8.4 -9 692.20 -44.4 -44.5 -44.5 74 -99 SPO 1997 04 05 20 13 331 8.6 -9 692.20 -44.4 -44.5 -44.5 73 -99 SPO 1997 04 05 20 14 330 8.7 -9 692.20 -44.4 -44.5 -44.4 73 -99 SPO 1997 04 05 20 15 331 8.8 -9 692.10 -44.4 -44.5 -44.4 74 -99 SPO 1997 04 05 20 16 329 8.8 -9 692.20 -44.3 -44.4 -44.4 73 -99 SPO 1997 04 05 20 17 329 8.4 -9 692.20 -44.3 -44.4 -44.3 74 -99 SPO 1997 04 05 20 18 329 8.7 -9 692.20 -44.3 -44.3 -44.3 75 -99 SPO 1997 04 05 20 19 329 8.9 -9 692.20 -44.3 -44.3 -44.3 75 -99 SPO 1997 04 05 20 20 331 8.8 -9 692.10 -44.3 -44.3 -44.3 75 -99 SPO 1997 04 05 20 21 331 8.8 -9 692.10 -44.2 -44.3 -44.3 75 -99 SPO 1997 04 05 20 22 332 8.6 -9 692.00 -44.2 -44.3 -44.4 75 -99 SPO 1997 04 05 20 23 332 8.7 -9 692.00 -44.2 -44.3 -44.4 75 -99 SPO 1997 04 05 20 24 331 8.7 -9 692.00 -44.3 -44.3 -44.4 76 -99 SPO 1997 04 05 20 25 330 8.6 -9 692.00 -44.3 -44.3 -44.4 75 -99 SPO 1997 04 05 20 26 330 8.5 -9 692.10 -44.3 -44.2 -44.3 75 -99 SPO 1997 04 05 20 27 330 8.5 -9 692.20 -44.2 -44.3 -44.3 73 -99 SPO 1997 04 05 20 28 328 8.7 -9 692.10 -44.2 -44.2 -44.3 73 -99 SPO 1997 04 05 20 29 329 8.8 -9 692.10 -44.2 -44.2 -44.3 74 -99 SPO 1997 04 05 20 30 329 9.1 -9 692.10 -44.2 -44.2 -44.2 74 -99 SPO 1997 04 05 20 31 328 8.9 -9 692.10 -44.2 -44.1 -44.2 75 -99 SPO 1997 04 05 20 32 327 9.1 -9 692.00 -44.2 -44.1 -44.2 75 -99 SPO 1997 04 05 20 33 328 9.2 -9 692.00 -44.1 -44.1 -44.2 74 -99 SPO 1997 04 05 20 34 327 9.1 -9 692.00 -44.1 -44.1 -44.2 75 -99 SPO 1997 04 05 20 35 327 8.9 -9 691.90 -44.1 -44.1 -44.1 75 -99 SPO 1997 04 05 20 36 324 9.1 -9 691.90 -44.1 -44.1 -44.1 75 -99 SPO 1997 04 05 20 37 323 9.5 -9 691.90 -44.0 -44.0 -44.0 75 -99 SPO 1997 04 05 20 38 326 9.1 -9 691.90 -43.9 -44.0 -43.9 74 -99 SPO 1997 04 05 20 39 327 8.3 -9 691.90 -43.9 -44.0 -44.0 73 -99 SPO 1997 04 05 20 40 328 8.6 -9 692.00 -44.0 -44.0 -44.1 74 -99 SPO 1997 04 05 20 41 328 8.5 -9 692.00 -44.0 -44.0 -44.1 74 -99 SPO 1997 04 05 20 42 328 8.1 -9 691.90 -44.0 -44.1 -44.1 74 -99 SPO 1997 04 05 20 43 327 8.5 -9 691.90 -44.0 -44.0 -44.1 74 -99 SPO 1997 04 05 20 44 326 8.9 -9 691.90 -43.9 -44.0 -44.0 73 -99 SPO 1997 04 05 20 45 325 9.5 -9 691.90 -43.9 -43.9 -43.8 74 -99 SPO 1997 04 05 20 46 324 9.8 -9 691.80 -43.8 -43.8 -43.7 74 -99 SPO 1997 04 05 20 47 324 10.4 -9 691.80 -43.7 -43.7 -43.6 74 -99 SPO 1997 04 05 20 48 323 9.9 -9 691.80 -43.6 -43.6 -43.6 74 -99 SPO 1997 04 05 20 49 324 10.5 -9 691.80 -43.6 -43.6 -43.6 74 -99 SPO 1997 04 05 20 50 323 9.5 -9 691.80 -43.5 -43.5 -43.6 73 -99 SPO 1997 04 05 20 51 324 10.2 -9 691.80 -43.5 -43.5 -43.5 73 -99 SPO 1997 04 05 20 52 323 9.7 -9 691.90 -43.5 -43.5 -43.5 72 -99 SPO 1997 04 05 20 53 324 9.4 -9 691.90 -43.4 -43.5 -43.5 71 -99 SPO 1997 04 05 20 54 324 9.6 -9 691.90 -43.4 -43.5 -43.5 71 -99 SPO 1997 04 05 20 55 325 9.7 -9 691.90 -43.4 -43.5 -43.4 72 -99 SPO 1997 04 05 20 56 325 9.8 -9 691.90 -43.4 -43.5 -43.4 74 -99 SPO 1997 04 05 20 57 325 9.2 -9 691.90 -43.4 -43.5 -43.4 75 -99 SPO 1997 04 05 20 58 327 9.4 -9 691.90 -43.4 -43.5 -43.4 76 -99 SPO 1997 04 05 20 59 326 9.6 -9 691.90 -43.4 -43.5 -43.4 76 -99 SPO 1997 04 05 21 00 327 9.4 -9 691.80 -43.3 -43.5 -43.4 74 0 SPO 1997 04 05 21 01 326 9.5 -9 691.80 -43.4 -43.5 -43.4 76 -99 SPO 1997 04 05 21 02 325 9.9 -9 691.80 -43.4 -43.5 -43.4 74 -99 SPO 1997 04 05 21 03 324 10.1 -9 691.80 -43.3 -43.4 -43.4 72 -99 SPO 1997 04 05 21 04 326 9.7 -9 691.80 -43.3 -43.4 -43.4 72 -99 SPO 1997 04 05 21 05 325 9.8 -9 691.80 -43.4 -43.4 -43.4 71 -99 SPO 1997 04 05 21 06 326 9.7 -9 691.80 -43.3 -43.3 -43.4 72 -99 SPO 1997 04 05 21 07 325 10.1 -9 691.80 -43.2 -43.3 -43.4 71 -99 SPO 1997 04 05 21 08 325 10.3 -9 691.70 -43.2 -43.3 -43.3 72 -99 SPO 1997 04 05 21 09 325 10.1 -9 691.70 -43.3 -43.3 -43.3 74 -99 SPO 1997 04 05 21 10 325 10.0 -9 691.60 -43.3 -43.3 -43.4 74 -99 SPO 1997 04 05 21 11 325 10.4 -9 691.60 -43.3 -43.3 -43.4 74 -99 SPO 1997 04 05 21 12 324 10.7 -9 691.50 -43.3 -43.3 -43.4 73 -99 SPO 1997 04 05 21 13 323 10.0 -9 691.60 -43.3 -43.3 -43.4 73 -99 SPO 1997 04 05 21 14 324 10.2 -9 691.60 -43.3 -43.4 -43.4 72 -99 SPO 1997 04 05 21 15 323 10.2 -9 691.60 -43.3 -43.4 -43.4 72 -99 SPO 1997 04 05 21 16 325 9.8 -9 691.60 -43.4 -43.5 -43.4 72 -99 SPO 1997 04 05 21 17 323 10.1 -9 691.60 -43.4 -43.5 -43.4 72 -99 SPO 1997 04 05 21 18 323 10.1 -9 691.70 -43.4 -43.5 -43.4 72 -99 SPO 1997 04 05 21 19 323 9.6 -9 691.70 -43.3 -43.5 -43.4 71 -99 SPO 1997 04 05 21 20 324 9.6 -9 691.70 -43.3 -43.5 -43.4 72 -99 SPO 1997 04 05 21 21 323 9.9 -9 691.70 -43.3 -43.5 -43.4 73 -99 SPO 1997 04 05 21 22 322 9.6 -9 691.70 -43.3 -43.4 -43.3 73 -99 SPO 1997 04 05 21 23 323 9.5 -9 691.70 -43.3 -43.4 -43.3 74 -99 SPO 1997 04 05 21 24 322 9.1 -9 691.80 -43.3 -43.4 -43.3 74 -99 SPO 1997 04 05 21 25 321 8.8 -9 691.80 -43.3 -43.4 -43.3 75 -99 SPO 1997 04 05 21 26 321 8.6 -9 691.90 -43.3 -43.4 -43.3 76 -99 SPO 1997 04 05 21 27 322 8.8 -9 691.90 -43.3 -43.4 -43.3 76 -99 SPO 1997 04 05 21 28 321 8.9 -9 691.90 -43.2 -43.3 -43.3 76 -99 SPO 1997 04 05 21 29 322 8.9 -9 691.80 -43.1 -43.3 -43.3 75 -99 SPO 1997 04 05 21 30 321 8.6 -9 691.90 -43.1 -43.3 -43.2 73 -99 SPO 1997 04 05 21 31 320 9.0 -9 691.90 -43.2 -43.2 -43.2 74 -99 SPO 1997 04 05 21 32 320 8.9 -9 691.90 -43.2 -43.2 -43.2 74 -99 SPO 1997 04 05 21 33 320 9.2 -9 691.80 -43.2 -43.2 -43.2 74 -99 SPO 1997 04 05 21 34 320 9.2 -9 691.80 -43.1 -43.2 -43.2 74 -99 SPO 1997 04 05 21 35 320 9.3 -9 691.80 -43.1 -43.2 -43.2 74 -99 SPO 1997 04 05 21 36 320 9.3 -9 691.80 -43.1 -43.2 -43.2 74 -99 SPO 1997 04 05 21 37 321 9.0 -9 691.80 -43.1 -43.2 -43.2 75 -99 SPO 1997 04 05 21 38 320 8.9 -9 691.80 -43.1 -43.2 -43.2 75 -99 SPO 1997 04 05 21 39 320 9.0 -9 691.80 -43.1 -43.2 -43.2 76 -99 SPO 1997 04 05 21 40 320 9.1 -9 691.80 -43.1 -43.2 -43.2 75 -99 SPO 1997 04 05 21 41 320 9.0 -9 691.80 -43.1 -43.2 -43.2 75 -99 SPO 1997 04 05 21 42 320 9.0 -9 691.80 -43.1 -43.2 -43.2 74 -99 SPO 1997 04 05 21 43 320 8.9 -9 691.80 -43.1 -43.2 -43.2 74 -99 SPO 1997 04 05 21 44 319 9.0 -9 691.80 -43.1 -43.2 -43.2 74 -99 SPO 1997 04 05 21 45 319 9.3 -9 691.80 -43.1 -43.1 -43.1 74 -99 SPO 1997 04 05 21 46 319 9.0 -9 691.70 -43.1 -43.1 -43.1 74 -99 SPO 1997 04 05 21 47 318 8.8 -9 691.70 -43.0 -43.1 -43.1 74 -99 SPO 1997 04 05 21 48 317 9.4 -9 691.70 -43.0 -43.1 -43.0 76 -99 SPO 1997 04 05 21 49 318 9.5 -9 691.70 -43.0 -43.0 -43.0 76 -99 SPO 1997 04 05 21 50 319 9.5 -9 691.70 -43.0 -43.0 -43.0 76 -99 SPO 1997 04 05 21 51 318 9.5 -9 691.70 -43.0 -43.0 -43.0 76 -99 SPO 1997 04 05 21 52 318 9.1 -9 691.70 -42.9 -43.0 -43.0 75 -99 SPO 1997 04 05 21 53 318 9.2 -9 691.70 -42.9 -43.0 -43.0 76 -99 SPO 1997 04 05 21 54 318 9.2 -9 691.80 -42.9 -43.0 -43.0 76 -99 SPO 1997 04 05 21 55 319 8.9 -9 691.70 -42.9 -43.0 -43.0 75 -99 SPO 1997 04 05 21 56 318 8.8 -9 691.80 -42.9 -43.0 -43.0 73 -99 SPO 1997 04 05 21 57 319 9.1 -9 691.80 -42.9 -43.0 -43.0 72 -99 SPO 1997 04 05 21 58 319 8.8 -9 691.70 -42.9 -43.0 -43.0 72 -99 SPO 1997 04 05 21 59 318 9.2 -9 691.70 -43.0 -43.0 -43.0 74 -99 SPO 1997 04 05 22 00 318 9.2 -9 691.70 -42.9 -43.0 -43.0 75 0 SPO 1997 04 05 22 01 318 9.0 -9 691.60 -42.9 -43.0 -43.0 76 -99 SPO 1997 04 05 22 02 317 9.2 -9 691.60 -42.9 -43.0 -43.0 76 -99 SPO 1997 04 05 22 03 316 9.0 -9 691.70 -42.9 -42.9 -42.9 76 -99 SPO 1997 04 05 22 04 315 8.9 -9 691.70 -42.8 -42.9 -42.9 75 -99 SPO 1997 04 05 22 05 314 8.8 -9 691.80 -42.8 -42.8 -42.8 75 -99 SPO 1997 04 05 22 06 315 8.2 -9 691.80 -42.8 -42.8 -42.9 75 -99 SPO 1997 04 05 22 07 316 8.5 -9 691.80 -42.8 -42.9 -42.9 75 -99 SPO 1997 04 05 22 08 316 8.7 -9 691.80 -42.8 -42.9 -42.9 76 -99 SPO 1997 04 05 22 09 316 8.7 -9 691.70 -42.8 -42.9 -42.9 75 -99 SPO 1997 04 05 22 10 316 8.7 -9 691.70 -42.8 -42.9 -42.9 75 -99 SPO 1997 04 05 22 11 316 8.9 -9 691.70 -42.9 -42.9 -42.9 76 -99 SPO 1997 04 05 22 12 317 8.6 -9 691.70 -42.8 -42.9 -42.9 75 -99 SPO 1997 04 05 22 13 316 8.7 -9 691.70 -42.8 -42.8 -42.9 75 -99 SPO 1997 04 05 22 14 316 8.5 -9 691.70 -42.8 -42.8 -42.9 76 -99 SPO 1997 04 05 22 15 317 8.0 -9 691.70 -42.8 -42.8 -42.9 76 -99 SPO 1997 04 05 22 16 315 8.4 -9 691.70 -42.8 -42.8 -42.9 76 -99 SPO 1997 04 05 22 17 315 8.1 -9 691.80 -42.8 -42.8 -42.8 76 -99 SPO 1997 04 05 22 18 316 8.0 -9 691.80 -42.7 -42.7 -42.8 74 -99 SPO 1997 04 05 22 19 317 8.4 -9 691.70 -42.7 -42.8 -42.8 74 -99 SPO 1997 04 05 22 20 317 8.3 -9 691.70 -42.7 -42.8 -42.8 75 -99 SPO 1997 04 05 22 21 317 8.4 -9 691.60 -42.7 -42.8 -42.7 75 -99 SPO 1997 04 05 22 22 317 8.8 -9 691.60 -42.7 -42.8 -42.7 75 -99 SPO 1997 04 05 22 23 317 8.8 -9 691.60 -42.7 -42.7 -42.7 75 -99 SPO 1997 04 05 22 24 317 8.7 -9 691.60 -42.6 -42.7 -42.7 73 -99 SPO 1997 04 05 22 25 318 8.5 -9 691.60 -42.6 -42.7 -42.6 74 -99 SPO 1997 04 05 22 26 316 8.4 -9 691.60 -42.6 -42.7 -42.7 75 -99 SPO 1997 04 05 22 27 316 8.6 -9 691.60 -42.6 -42.7 -42.7 76 -99 SPO 1997 04 05 22 28 315 8.7 -9 691.60 -42.6 -42.6 -42.6 76 -99 SPO 1997 04 05 22 29 316 9.1 -9 691.60 -42.6 -42.6 -42.6 76 -99 SPO 1997 04 05 22 30 318 9.0 -9 691.60 -42.5 -42.6 -42.6 76 -99 SPO 1997 04 05 22 31 319 9.1 -9 691.50 -42.5 -42.6 -42.6 76 -99 SPO 1997 04 05 22 32 319 9.3 -9 691.50 -42.5 -42.6 -42.6 76 -99 SPO 1997 04 05 22 33 319 9.3 -9 691.50 -42.5 -42.6 -42.6 76 -99 SPO 1997 04 05 22 34 319 9.6 -9 691.50 -42.5 -42.6 -42.6 76 -99 SPO 1997 04 05 22 35 319 9.2 -9 691.50 -42.6 -42.6 -42.6 76 -99 SPO 1997 04 05 22 36 319 9.1 -9 691.50 -42.5 -42.5 -42.6 74 -99 SPO 1997 04 05 22 37 319 9.0 -9 691.50 -42.4 -42.5 -42.6 73 -99 SPO 1997 04 05 22 38 319 9.2 -9 691.50 -42.5 -42.5 -42.6 74 -99 SPO 1997 04 05 22 39 319 9.2 -9 691.50 -42.5 -42.5 -42.6 75 -99 SPO 1997 04 05 22 40 320 8.9 -9 691.50 -42.5 -42.5 -42.6 75 -99 SPO 1997 04 05 22 41 319 8.5 -9 691.60 -42.5 -42.6 -42.6 76 -99 SPO 1997 04 05 22 42 318 8.4 -9 691.60 -42.5 -42.6 -42.6 77 -99 SPO 1997 04 05 22 43 318 8.2 -9 691.70 -42.5 -42.6 -42.6 77 -99 SPO 1997 04 05 22 44 317 8.4 -9 691.70 -42.5 -42.6 -42.6 77 -99 SPO 1997 04 05 22 45 317 8.1 -9 691.70 -42.5 -42.6 -42.5 77 -99 SPO 1997 04 05 22 46 316 8.2 -9 691.70 -42.4 -42.5 -42.5 76 -99 SPO 1997 04 05 22 47 316 8.1 -9 691.70 -42.4 -42.5 -42.4 75 -99 SPO 1997 04 05 22 48 316 7.8 -9 691.80 -42.4 -42.4 -42.4 75 -99 SPO 1997 04 05 22 49 316 8.0 -9 691.80 -42.3 -42.4 -42.4 74 -99 SPO 1997 04 05 22 50 317 8.0 -9 691.80 -42.4 -42.4 -42.4 75 -99 SPO 1997 04 05 22 51 315 8.1 -9 691.80 -42.4 -42.4 -42.4 75 -99 SPO 1997 04 05 22 52 315 8.0 -9 691.80 -42.3 -42.4 -42.4 76 -99 SPO 1997 04 05 22 53 314 7.9 -9 691.80 -42.3 -42.3 -42.4 77 -99 SPO 1997 04 05 22 54 313 8.5 -9 691.80 -42.3 -42.3 -42.3 77 -99 SPO 1997 04 05 22 55 312 8.9 -9 691.80 -42.2 -42.2 -42.2 76 -99 SPO 1997 04 05 22 56 313 8.6 -9 691.80 -42.2 -42.2 -42.2 76 -99 SPO 1997 04 05 22 57 314 8.8 -9 691.70 -42.2 -42.2 -42.2 76 -99 SPO 1997 04 05 22 58 313 8.4 -9 691.70 -42.2 -42.2 -42.2 77 -99 SPO 1997 04 05 22 59 313 8.4 -9 691.70 -42.2 -42.2 -42.2 77 -99 SPO 1997 04 05 23 00 313 8.4 -9 691.70 -42.1 -42.2 -42.2 77 0 SPO 1997 04 05 23 01 314 8.3 -9 691.70 -42.1 -42.2 -42.2 76 -99 SPO 1997 04 05 23 02 314 8.0 -9 691.60 -42.1 -42.1 -42.2 75 -99 SPO 1997 04 05 23 03 314 8.3 -9 691.60 -42.2 -42.2 -42.2 75 -99 SPO 1997 04 05 23 04 315 8.5 -9 691.50 -42.2 -42.2 -42.2 75 -99 SPO 1997 04 05 23 05 314 8.8 -9 691.50 -42.1 -42.2 -42.2 75 -99 SPO 1997 04 05 23 06 313 8.6 -9 691.50 -42.1 -42.2 -42.2 76 -99 SPO 1997 04 05 23 07 313 9.3 -9 691.50 -42.1 -42.2 -42.2 77 -99 SPO 1997 04 05 23 08 313 8.8 -9 691.50 -42.1 -42.2 -42.1 77 -99 SPO 1997 04 05 23 09 312 8.8 -9 691.50 -42.0 -42.1 -42.1 75 -99 SPO 1997 04 05 23 10 313 9.0 -9 691.50 -42.0 -42.1 -42.0 76 -99 SPO 1997 04 05 23 11 312 9.3 -9 691.50 -42.0 -42.1 -42.0 77 -99 SPO 1997 04 05 23 12 312 9.1 -9 691.50 -42.0 -42.0 -42.0 77 -99 SPO 1997 04 05 23 13 314 9.4 -9 691.50 -41.9 -42.0 -42.0 76 -99 SPO 1997 04 05 23 14 314 9.2 -9 691.50 -41.9 -42.0 -42.0 76 -99 SPO 1997 04 05 23 15 315 9.0 -9 691.50 -41.9 -42.0 -42.0 76 -99 SPO 1997 04 05 23 16 316 8.9 -9 691.50 -41.9 -42.0 -42.0 75 -99 SPO 1997 04 05 23 17 316 8.7 -9 691.50 -41.9 -41.9 -41.9 75 -99 SPO 1997 04 05 23 18 317 8.7 -9 691.50 -41.9 -41.9 -41.9 75 -99 SPO 1997 04 05 23 19 317 8.6 -9 691.50 -41.9 -41.9 -41.9 76 -99 SPO 1997 04 05 23 20 316 8.7 -9 691.50 -41.9 -41.9 -41.9 77 -99 SPO 1997 04 05 23 21 315 9.0 -9 691.60 -41.9 -41.8 -41.9 77 -99 SPO 1997 04 05 23 22 315 8.6 -9 691.60 -41.9 -41.8 -41.9 77 -99 SPO 1997 04 05 23 23 315 8.7 -9 691.60 -41.8 -41.8 -41.9 77 -99 SPO 1997 04 05 23 24 317 8.7 -9 691.50 -41.8 -41.8 -41.9 76 -99 SPO 1997 04 05 23 25 318 8.6 -9 691.50 -41.8 -41.9 -41.9 76 -99 SPO 1997 04 05 23 26 318 8.5 -9 691.50 -41.8 -42.0 -41.9 77 -99 SPO 1997 04 05 23 27 319 8.4 -9 691.50 -41.8 -42.0 -42.0 76 -99 SPO 1997 04 05 23 28 318 8.8 -9 691.40 -41.9 -42.0 -41.9 76 -99 SPO 1997 04 05 23 29 318 9.0 -9 691.40 -41.9 -42.0 -41.9 76 -99 SPO 1997 04 05 23 30 317 9.3 -9 691.40 -41.9 -42.0 -41.9 76 -99 SPO 1997 04 05 23 31 316 9.4 -9 691.40 -41.8 -41.9 -41.9 75 -99 SPO 1997 04 05 23 32 316 9.4 -9 691.40 -41.8 -41.9 -41.9 75 -99 SPO 1997 04 05 23 33 315 9.2 -9 691.40 -41.8 -41.9 -41.8 75 -99 SPO 1997 04 05 23 34 315 9.3 -9 691.40 -41.8 -41.8 -41.8 77 -99 SPO 1997 04 05 23 35 314 9.1 -9 691.40 -41.8 -41.8 -41.8 77 -99 SPO 1997 04 05 23 36 315 9.1 -9 691.50 -41.8 -41.8 -41.8 77 -99 SPO 1997 04 05 23 37 315 9.1 -9 691.50 -41.7 -41.8 -41.8 76 -99 SPO 1997 04 05 23 38 314 9.0 -9 691.50 -41.7 -41.8 -41.8 77 -99 SPO 1997 04 05 23 39 314 8.8 -9 691.50 -41.7 -41.8 -41.8 77 -99 SPO 1997 04 05 23 40 315 8.6 -9 691.50 -41.7 -41.8 -41.8 77 -99 SPO 1997 04 05 23 41 314 8.9 -9 691.50 -41.7 -41.8 -41.8 76 -99 SPO 1997 04 05 23 42 314 8.7 -9 691.40 -41.7 -41.8 -41.8 76 -99 SPO 1997 04 05 23 43 315 9.0 -9 691.40 -41.8 -41.8 -41.8 76 -99 SPO 1997 04 05 23 44 315 9.1 -9 691.40 -41.8 -41.8 -41.8 76 -99 SPO 1997 04 05 23 45 314 9.0 -9 691.40 -41.8 -41.8 -41.8 77 -99 SPO 1997 04 05 23 46 314 8.8 -9 691.40 -41.8 -41.8 -41.8 77 -99 SPO 1997 04 05 23 47 314 9.0 -9 691.50 -41.7 -41.8 -41.8 76 -99 SPO 1997 04 05 23 48 314 8.4 -9 691.40 -41.7 -41.8 -41.8 77 -99 SPO 1997 04 05 23 49 313 8.4 -9 691.50 -41.7 -41.8 -41.8 77 -99 SPO 1997 04 05 23 50 313 8.1 -9 691.50 -41.7 -41.8 -41.8 78 -99 SPO 1997 04 05 23 51 312 8.2 -9 691.50 -41.7 -41.8 -41.8 78 -99 SPO 1997 04 05 23 52 311 8.5 -9 691.50 -41.7 -41.8 -41.7 78 -99 SPO 1997 04 05 23 53 310 7.5 -9 691.50 -41.7 -41.8 -41.7 78 -99 SPO 1997 04 05 23 54 310 7.9 -9 691.60 -41.7 -41.7 -41.7 78 -99 SPO 1997 04 05 23 55 310 8.0 -9 691.50 -41.6 -41.7 -41.7 77 -99 SPO 1997 04 05 23 56 311 8.2 -9 691.50 -41.6 -41.7 -41.7 75 -99 SPO 1997 04 05 23 57 310 8.2 -9 691.50 -41.6 -41.7 -41.7 75 -99 SPO 1997 04 05 23 58 312 8.5 -9 691.50 -41.6 -41.7 -41.6 -99 -99 SPO 1997 04 05 23 59 313 8.2 -9 691.50 -41.6 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 00 313 8.0 -9 691.50 -41.6 -41.8 -41.7 -99 0 SPO 1997 04 06 00 01 313 8.3 -9 691.50 -41.6 -41.8 -41.7 -99 -99 SPO 1997 04 06 00 02 313 8.5 -9 691.50 -41.6 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 03 313 9.0 -9 691.40 -41.6 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 04 312 9.1 -9 691.40 -41.6 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 05 313 8.8 -9 691.40 -41.5 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 06 312 9.2 -9 691.40 -41.5 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 07 311 8.7 -9 691.40 -41.5 -41.5 -41.6 -99 -99 SPO 1997 04 06 00 08 311 8.7 -9 691.40 -41.5 -41.5 -41.6 -99 -99 SPO 1997 04 06 00 09 312 8.9 -9 691.40 -41.5 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 10 314 9.2 -9 691.30 -41.5 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 11 314 9.0 -9 691.20 -41.5 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 12 314 9.2 -9 691.20 -41.5 -41.6 -41.6 -99 -99 SPO 1997 04 06 00 13 314 9.2 -9 691.20 -41.5 -41.6 -41.6 77 -99 SPO 1997 04 06 00 14 314 9.4 -9 691.20 -41.5 -41.6 -41.6 77 -99 SPO 1997 04 06 00 15 313 9.1 -9 691.20 -41.5 -41.6 -41.6 77 -99 SPO 1997 04 06 00 16 313 9.2 -9 691.20 -41.5 -41.6 -41.6 77 -99 SPO 1997 04 06 00 17 312 9.4 -9 691.20 -41.5 -41.6 -41.6 77 -99 SPO 1997 04 06 00 18 311 9.0 -9 691.20 -41.5 -41.6 -41.5 77 -99 SPO 1997 04 06 00 19 312 8.9 -9 691.30 -41.5 -41.5 -41.5 78 -99 SPO 1997 04 06 00 20 312 8.6 -9 691.30 -41.5 -41.5 -41.5 78 -99 SPO 1997 04 06 00 21 312 8.9 -9 691.30 -41.5 -41.5 -41.5 78 -99 SPO 1997 04 06 00 22 311 8.6 -9 691.30 -41.5 -41.5 -41.5 77 -99 SPO 1997 04 06 00 23 311 8.5 -9 691.40 -41.4 -41.5 -41.5 76 -99 SPO 1997 04 06 00 24 311 8.4 -9 691.40 -41.4 -41.5 -41.5 76 -99 SPO 1997 04 06 00 25 311 8.9 -9 691.40 -41.4 -41.4 -41.4 77 -99 SPO 1997 04 06 00 26 311 8.6 -9 691.40 -41.4 -41.4 -41.4 78 -99 SPO 1997 04 06 00 27 312 8.0 -9 691.40 -41.4 -41.4 -41.4 78 -99 SPO 1997 04 06 00 28 314 7.9 -9 691.40 -41.4 -41.4 -41.5 78 -99 SPO 1997 04 06 00 29 313 7.7 -9 691.40 -41.4 -41.4 -41.5 78 -99 SPO 1997 04 06 00 30 313 8.2 -9 691.30 -41.4 -41.4 -41.4 78 -99 SPO 1997 04 06 00 31 313 8.0 -9 691.30 -41.4 -41.4 -41.5 78 -99 SPO 1997 04 06 00 32 313 8.2 -9 691.40 -41.4 -41.4 -41.4 77 -99 SPO 1997 04 06 00 33 312 7.8 -9 691.40 -41.4 -41.5 -41.5 77 -99 SPO 1997 04 06 00 34 311 8.0 -9 691.40 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 35 311 8.2 -9 691.50 -41.4 -41.5 -41.4 77 -99 SPO 1997 04 06 00 36 311 7.5 -9 691.50 -41.4 -41.5 -41.5 77 -99 SPO 1997 04 06 00 37 311 7.3 -9 691.50 -41.4 -41.5 -41.5 76 -99 SPO 1997 04 06 00 38 310 7.4 -9 691.50 -41.4 -41.6 -41.5 77 -99 SPO 1997 04 06 00 39 310 7.9 -9 691.50 -41.4 -41.5 -41.5 77 -99 SPO 1997 04 06 00 40 309 7.7 -9 691.50 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 41 308 7.5 -9 691.50 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 42 309 7.5 -9 691.50 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 43 309 7.5 -9 691.50 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 44 310 7.4 -9 691.50 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 45 311 7.5 -9 691.40 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 46 311 7.3 -9 691.40 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 47 314 7.1 -9 691.40 -41.4 -41.5 -41.5 78 -99 SPO 1997 04 06 00 48 314 7.0 -9 691.40 -41.4 -41.5 -41.5 77 -99 SPO 1997 04 06 00 49 313 7.3 -9 691.40 -41.4 -41.4 -41.5 77 -99 SPO 1997 04 06 00 50 313 7.2 -9 691.50 -41.4 -41.4 -41.4 76 -99 SPO 1997 04 06 00 51 313 7.3 -9 691.50 -41.4 -41.4 -41.4 76 -99 SPO 1997 04 06 00 52 313 7.2 -9 691.50 -41.4 -41.4 -41.4 77 -99 SPO 1997 04 06 00 53 312 7.5 -9 691.50 -41.3 -41.3 -41.4 78 -99 SPO 1997 04 06 00 54 313 7.6 -9 691.50 -41.3 -41.3 -41.3 78 -99 SPO 1997 04 06 00 55 311 8.0 -9 691.50 -41.2 -41.3 -41.3 77 -99 SPO 1997 04 06 00 56 311 8.0 -9 691.50 -41.2 -41.3 -41.3 78 -99 SPO 1997 04 06 00 57 311 8.4 -9 691.40 -41.2 -41.3 -41.2 78 -99 SPO 1997 04 06 00 58 310 8.1 -9 691.40 -41.2 -41.3 -41.2 79 -99 SPO 1997 04 06 00 59 310 8.0 -9 691.40 -41.2 -41.3 -41.2 79 -99 SPO 1997 04 06 01 00 310 7.9 -9 691.40 -41.2 -41.2 -41.2 78 0 SPO 1997 04 06 01 01 310 7.7 -9 691.40 -41.1 -41.2 -41.2 78 -99 SPO 1997 04 06 01 02 310 7.8 -9 691.40 -41.1 -41.2 -41.2 78 -99 SPO 1997 04 06 01 03 311 7.8 -9 691.40 -41.1 -41.2 -41.2 76 -99 SPO 1997 04 06 01 04 312 7.5 -9 691.40 -41.1 -41.2 -41.2 74 -99 SPO 1997 04 06 01 05 313 7.5 -9 691.30 -41.1 -41.2 -41.2 76 -99 SPO 1997 04 06 01 06 314 7.4 -9 691.30 -41.1 -41.2 -41.2 76 -99 SPO 1997 04 06 01 07 312 7.5 -9 691.30 -41.1 -41.2 -41.2 78 -99 SPO 1997 04 06 01 08 312 7.7 -9 691.30 -41.1 -41.2 -41.2 78 -99 SPO 1997 04 06 01 09 312 7.5 -9 691.30 -41.1 -41.1 -41.2 78 -99 SPO 1997 04 06 01 10 313 7.7 -9 691.30 -41.1 -41.1 -41.2 78 -99 SPO 1997 04 06 01 11 314 7.6 -9 691.30 -41.1 -41.1 -41.1 78 -99 SPO 1997 04 06 01 12 315 7.5 -9 691.20 -41.1 -41.1 -41.1 78 -99 SPO 1997 04 06 01 13 314 7.4 -9 691.20 -41.1 -41.1 -41.1 78 -99 SPO 1997 04 06 01 14 314 7.9 -9 691.20 -41.1 -41.0 -41.1 80 -99 SPO 1997 04 06 01 15 314 7.9 -9 691.20 -41.0 -41.0 -41.1 78 -99 SPO 1997 04 06 01 16 312 8.0 -9 691.20 -41.0 -41.0 -41.1 77 -99 SPO 1997 04 06 01 17 312 8.2 -9 691.20 -41.0 -41.0 -41.1 77 -99 SPO 1997 04 06 01 18 312 8.4 -9 691.20 -41.0 -41.0 -41.0 77 -99 SPO 1997 04 06 01 19 312 8.1 -9 691.20 -41.0 -41.0 -41.0 77 -99 SPO 1997 04 06 01 20 313 8.2 -9 691.20 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 01 21 313 8.3 -9 691.10 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 01 22 315 8.5 -9 691.00 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 01 23 313 8.4 -9 691.10 -41.0 -41.0 -41.0 77 -99 SPO 1997 04 06 01 24 313 8.5 -9 691.10 -40.9 -41.0 -41.0 77 -99 SPO 1997 04 06 01 25 312 8.4 -9 691.10 -40.9 -41.0 -41.0 77 -99 SPO 1997 04 06 01 26 313 8.3 -9 691.10 -41.0 -41.0 -41.0 79 -99 SPO 1997 04 06 01 27 313 8.3 -9 691.10 -40.9 -41.0 -41.0 78 -99 SPO 1997 04 06 01 28 315 8.1 -9 691.10 -40.9 -41.0 -41.0 78 -99 SPO 1997 04 06 01 29 314 8.2 -9 691.00 -40.9 -41.0 -41.0 78 -99 SPO 1997 04 06 01 30 313 8.7 -9 691.00 -40.9 -40.9 -40.9 78 -99 SPO 1997 04 06 01 31 313 8.8 -9 691.00 -40.8 -40.9 -40.8 76 -99 SPO 1997 04 06 01 32 313 9.2 -9 691.00 -40.8 -40.8 -40.8 76 -99 SPO 1997 04 06 01 33 312 8.9 -9 691.00 -40.8 -40.8 -40.8 76 -99 SPO 1997 04 06 01 34 312 8.6 -9 691.00 -40.8 -40.8 -40.8 76 -99 SPO 1997 04 06 01 35 312 8.3 -9 691.00 -40.8 -40.8 -40.8 78 -99 SPO 1997 04 06 01 36 311 9.1 -9 690.90 -40.8 -40.8 -40.8 78 -99 SPO 1997 04 06 01 37 311 9.2 -9 690.90 -40.7 -40.7 -40.8 77 -99 SPO 1997 04 06 01 38 309 9.5 -9 690.90 -40.7 -40.7 -40.8 77 -99 SPO 1997 04 06 01 39 310 9.5 -9 690.80 -40.7 -40.6 -40.7 77 -99 SPO 1997 04 06 01 40 309 9.6 -9 690.80 -40.7 -40.7 -40.7 77 -99 SPO 1997 04 06 01 41 310 8.8 -9 690.80 -40.6 -40.7 -40.7 76 -99 SPO 1997 04 06 01 42 310 8.9 -9 690.80 -40.7 -40.8 -40.8 79 -99 SPO 1997 04 06 01 43 311 8.6 -9 690.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 01 44 310 8.8 -9 690.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 01 45 310 8.7 -9 690.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 01 46 310 8.2 -9 690.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 01 47 311 8.3 -9 690.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 01 48 309 8.1 -9 690.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 01 49 309 8.6 -9 690.80 -40.7 -40.8 -40.8 79 -99 SPO 1997 04 06 01 50 306 8.9 -9 690.90 -40.7 -40.7 -40.8 79 -99 SPO 1997 04 06 01 51 306 8.9 -9 690.90 -40.7 -40.7 -40.8 79 -99 SPO 1997 04 06 01 52 307 8.8 -9 690.80 -40.7 -40.7 -40.8 79 -99 SPO 1997 04 06 01 53 307 9.4 -9 690.80 -40.7 -40.7 -40.7 79 -99 SPO 1997 04 06 01 54 307 9.2 -9 690.80 -40.7 -40.7 -40.7 79 -99 SPO 1997 04 06 01 55 308 9.7 -9 690.80 -40.6 -40.6 -40.7 78 -99 SPO 1997 04 06 01 56 308 9.0 -9 690.70 -40.6 -40.7 -40.7 78 -99 SPO 1997 04 06 01 57 310 9.2 -9 690.70 -40.6 -40.6 -40.7 78 -99 SPO 1997 04 06 01 58 310 9.1 -9 690.70 -40.6 -40.6 -40.7 76 -99 SPO 1997 04 06 01 59 311 8.6 -9 690.80 -40.6 -40.6 -40.7 76 -99 SPO 1997 04 06 02 00 311 9.1 -9 690.80 -40.6 -40.6 -40.7 76 0 SPO 1997 04 06 02 01 309 8.6 -9 690.80 -40.6 -40.6 -40.7 76 -99 SPO 1997 04 06 02 02 309 8.2 -9 690.80 -40.6 -40.6 -40.7 76 -99 SPO 1997 04 06 02 03 309 9.0 -9 690.90 -40.6 -40.7 -40.7 76 -99 SPO 1997 04 06 02 04 307 9.1 -9 690.80 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 05 309 8.8 -9 690.80 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 06 307 8.5 -9 690.80 -40.6 -40.7 -40.7 79 -99 SPO 1997 04 06 02 07 307 9.0 -9 690.90 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 08 306 9.0 -9 690.90 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 09 307 8.5 -9 690.80 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 10 307 8.9 -9 690.80 -40.6 -40.7 -40.6 79 -99 SPO 1997 04 06 02 11 307 9.1 -9 690.80 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 12 308 8.5 -9 690.80 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 02 13 308 8.1 -9 690.80 -40.6 -40.6 -40.6 78 -99 SPO 1997 04 06 02 14 309 8.3 -9 690.80 -40.6 -40.6 -40.6 78 -99 SPO 1997 04 06 02 15 310 8.3 -9 690.80 -40.5 -40.6 -40.6 77 -99 SPO 1997 04 06 02 16 311 8.3 -9 690.80 -40.5 -40.6 -40.6 78 -99 SPO 1997 04 06 02 17 311 8.5 -9 690.80 -40.5 -40.6 -40.6 78 -99 SPO 1997 04 06 02 18 312 8.3 -9 690.80 -40.5 -40.6 -40.6 78 -99 SPO 1997 04 06 02 19 311 8.2 -9 690.80 -40.5 -40.5 -40.6 78 -99 SPO 1997 04 06 02 20 311 8.7 -9 690.70 -40.5 -40.5 -40.6 78 -99 SPO 1997 04 06 02 21 312 8.4 -9 690.70 -40.5 -40.5 -40.6 78 -99 SPO 1997 04 06 02 22 311 8.9 -9 690.70 -40.5 -40.5 -40.5 77 -99 SPO 1997 04 06 02 23 309 8.7 -9 690.80 -40.5 -40.5 -40.5 77 -99 SPO 1997 04 06 02 24 309 9.1 -9 690.80 -40.4 -40.5 -40.5 76 -99 SPO 1997 04 06 02 25 309 8.6 -9 690.80 -40.4 -40.5 -40.5 74 -99 SPO 1997 04 06 02 26 308 8.3 -9 690.80 -40.4 -40.5 -40.5 76 -99 SPO 1997 04 06 02 27 307 8.2 -9 690.80 -40.4 -40.6 -40.5 76 -99 SPO 1997 04 06 02 28 308 8.4 -9 690.80 -40.4 -40.6 -40.5 76 -99 SPO 1997 04 06 02 29 308 8.5 -9 690.80 -40.4 -40.6 -40.5 76 -99 SPO 1997 04 06 02 30 308 8.2 -9 690.80 -40.5 -40.6 -40.5 78 -99 SPO 1997 04 06 02 31 308 8.3 -9 690.80 -40.5 -40.6 -40.5 78 -99 SPO 1997 04 06 02 32 309 7.9 -9 690.80 -40.5 -40.6 -40.6 79 -99 SPO 1997 04 06 02 33 309 8.1 -9 690.80 -40.5 -40.6 -40.5 79 -99 SPO 1997 04 06 02 34 309 7.8 -9 690.80 -40.5 -40.5 -40.5 79 -99 SPO 1997 04 06 02 35 310 7.3 -9 690.80 -40.5 -40.5 -40.5 78 -99 SPO 1997 04 06 02 36 309 7.8 -9 690.80 -40.4 -40.5 -40.5 77 -99 SPO 1997 04 06 02 37 311 7.7 -9 690.80 -40.4 -40.4 -40.5 77 -99 SPO 1997 04 06 02 38 312 7.9 -9 690.80 -40.4 -40.4 -40.4 77 -99 SPO 1997 04 06 02 39 312 7.7 -9 690.80 -40.4 -40.4 -40.4 76 -99 SPO 1997 04 06 02 40 312 7.2 -9 690.80 -40.4 -40.4 -40.4 76 -99 SPO 1997 04 06 02 41 312 7.6 -9 690.90 -40.4 -40.4 -40.4 76 -99 SPO 1997 04 06 02 42 312 7.6 -9 690.80 -40.3 -40.4 -40.4 76 -99 SPO 1997 04 06 02 43 314 7.4 -9 690.80 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 44 315 7.5 -9 690.80 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 45 315 7.6 -9 690.80 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 46 317 8.0 -9 690.70 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 47 315 7.8 -9 690.70 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 48 315 8.1 -9 690.70 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 49 314 7.7 -9 690.70 -40.3 -40.5 -40.4 78 -99 SPO 1997 04 06 02 50 315 7.7 -9 690.70 -40.3 -40.5 -40.4 78 -99 SPO 1997 04 06 02 51 315 8.0 -9 690.70 -40.3 -40.5 -40.4 78 -99 SPO 1997 04 06 02 52 315 8.2 -9 690.60 -40.3 -40.5 -40.4 78 -99 SPO 1997 04 06 02 53 315 7.9 -9 690.60 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 54 312 7.8 -9 690.60 -40.3 -40.4 -40.4 76 -99 SPO 1997 04 06 02 55 313 7.8 -9 690.60 -40.3 -40.4 -40.4 76 -99 SPO 1997 04 06 02 56 313 7.8 -9 690.60 -40.3 -40.4 -40.3 78 -99 SPO 1997 04 06 02 57 313 7.8 -9 690.60 -40.3 -40.4 -40.3 78 -99 SPO 1997 04 06 02 58 312 7.9 -9 690.60 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 02 59 313 8.0 -9 690.50 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 03 00 313 8.3 -9 690.50 -40.3 -40.4 -40.3 78 0 SPO 1997 04 06 03 01 314 8.1 -9 690.50 -40.3 -40.4 -40.4 78 -99 SPO 1997 04 06 03 02 314 8.0 -9 690.50 -40.3 -40.4 -40.3 78 -99 SPO 1997 04 06 03 03 315 7.3 -9 690.50 -40.3 -40.4 -40.3 78 -99 SPO 1997 04 06 03 04 314 7.8 -9 690.60 -40.3 -40.4 -40.3 78 -99 SPO 1997 04 06 03 05 313 7.2 -9 690.60 -40.2 -40.3 -40.3 77 -99 SPO 1997 04 06 03 06 314 7.0 -9 690.60 -40.2 -40.3 -40.3 77 -99 SPO 1997 04 06 03 07 313 7.3 -9 690.70 -40.2 -40.3 -40.3 75 -99 SPO 1997 04 06 03 08 313 7.2 -9 690.70 -40.2 -40.3 -40.3 75 -99 SPO 1997 04 06 03 09 316 6.9 -9 690.70 -40.2 -40.3 -40.3 75 -99 SPO 1997 04 06 03 10 318 7.1 -9 690.70 -40.3 -40.4 -40.3 75 -99 SPO 1997 04 06 03 11 317 7.7 -9 690.60 -40.3 -40.4 -40.3 78 -99 SPO 1997 04 06 03 12 317 7.0 -9 690.60 -40.3 -40.5 -40.4 78 -99 SPO 1997 04 06 03 13 318 7.5 -9 690.60 -40.3 -40.5 -40.4 78 -99 SPO 1997 04 06 03 14 320 7.1 -9 690.60 -40.4 -40.6 -40.4 79 -99 SPO 1997 04 06 03 15 319 7.1 -9 690.60 -40.4 -40.6 -40.5 79 -99 SPO 1997 04 06 03 16 318 6.9 -9 690.60 -40.4 -40.6 -40.5 79 -99 SPO 1997 04 06 03 17 319 6.7 -9 690.70 -40.4 -40.6 -40.5 79 -99 SPO 1997 04 06 03 18 319 6.9 -9 690.80 -40.4 -40.6 -40.5 79 -99 SPO 1997 04 06 03 19 319 6.6 -9 690.80 -40.5 -40.6 -40.5 79 -99 SPO 1997 04 06 03 20 318 6.2 -9 690.80 -40.5 -40.6 -40.6 78 -99 SPO 1997 04 06 03 21 319 6.1 -9 690.80 -40.5 -40.6 -40.6 77 -99 SPO 1997 04 06 03 22 321 6.4 -9 690.80 -40.5 -40.6 -40.5 77 -99 SPO 1997 04 06 03 23 322 6.4 -9 690.80 -40.5 -40.6 -40.5 77 -99 SPO 1997 04 06 03 24 321 6.2 -9 690.80 -40.5 -40.6 -40.5 77 -99 SPO 1997 04 06 03 25 323 6.4 -9 690.80 -40.5 -40.6 -40.5 78 -99 SPO 1997 04 06 03 26 322 6.6 -9 690.80 -40.5 -40.6 -40.5 78 -99 SPO 1997 04 06 03 27 322 6.9 -9 690.70 -40.5 -40.5 -40.5 78 -99 SPO 1997 04 06 03 28 322 6.9 -9 690.70 -40.5 -40.5 -40.5 78 -99 SPO 1997 04 06 03 29 322 6.7 -9 690.60 -40.4 -40.5 -40.5 77 -99 SPO 1997 04 06 03 30 323 7.0 -9 690.60 -40.4 -40.5 -40.5 79 -99 SPO 1997 04 06 03 31 321 7.1 -9 690.60 -40.4 -40.5 -40.5 79 -99 SPO 1997 04 06 03 32 320 7.2 -9 690.60 -40.4 -40.5 -40.5 77 -99 SPO 1997 04 06 03 33 320 7.0 -9 690.60 -40.4 -40.5 -40.5 77 -99 SPO 1997 04 06 03 34 321 6.9 -9 690.60 -40.4 -40.6 -40.5 77 -99 SPO 1997 04 06 03 35 320 6.7 -9 690.60 -40.4 -40.6 -40.5 76 -99 SPO 1997 04 06 03 36 321 6.5 -9 690.60 -40.5 -40.6 -40.6 77 -99 SPO 1997 04 06 03 37 322 6.8 -9 690.50 -40.5 -40.7 -40.6 77 -99 SPO 1997 04 06 03 38 321 6.6 -9 690.50 -40.5 -40.7 -40.6 77 -99 SPO 1997 04 06 03 39 320 6.6 -9 690.50 -40.5 -40.7 -40.6 77 -99 SPO 1997 04 06 03 40 320 6.6 -9 690.50 -40.5 -40.7 -40.6 77 -99 SPO 1997 04 06 03 41 320 6.7 -9 690.50 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 03 42 321 7.3 -9 690.50 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 03 43 322 6.9 -9 690.40 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 03 44 321 6.9 -9 690.40 -40.6 -40.7 -40.7 78 -99 SPO 1997 04 06 03 45 322 6.9 -9 690.40 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 03 46 323 6.7 -9 690.40 -40.6 -40.7 -40.6 78 -99 SPO 1997 04 06 03 47 325 6.4 -9 690.40 -40.6 -40.7 -40.7 78 -99 SPO 1997 04 06 03 48 325 6.3 -9 690.40 -40.6 -40.7 -40.7 76 -99 SPO 1997 04 06 03 49 327 6.5 -9 690.40 -40.6 -40.7 -40.7 76 -99 SPO 1997 04 06 03 50 328 6.6 -9 690.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 03 51 329 6.5 -9 690.40 -40.7 -40.7 -40.8 75 -99 SPO 1997 04 06 03 52 328 6.7 -9 690.40 -40.7 -40.8 -40.8 75 -99 SPO 1997 04 06 03 53 327 6.8 -9 690.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 03 54 327 7.0 -9 690.40 -40.7 -40.8 -40.8 75 -99 SPO 1997 04 06 03 55 326 7.3 -9 690.40 -40.8 -40.8 -40.8 76 -99 SPO 1997 04 06 03 56 325 7.0 -9 690.40 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 03 57 325 6.9 -9 690.40 -40.8 -40.9 -40.8 78 -99 SPO 1997 04 06 03 58 324 6.8 -9 690.40 -40.8 -40.9 -40.8 78 -99 SPO 1997 04 06 03 59 324 6.9 -9 690.40 -40.8 -40.9 -40.8 78 -99 SPO 1997 04 06 04 00 322 7.1 -9 690.40 -40.8 -40.9 -40.8 78 0 SPO 1997 04 06 04 01 322 7.2 -9 690.40 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 04 02 321 7.1 -9 690.40 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 04 03 322 7.2 -9 690.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 04 04 323 7.1 -9 690.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 04 05 323 7.0 -9 690.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 04 06 325 7.1 -9 690.30 -40.8 -40.8 -40.8 78 -99 SPO 1997 04 06 04 07 325 6.9 -9 690.30 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 04 08 323 7.3 -9 690.30 -40.8 -40.8 -40.8 78 -99 SPO 1997 04 06 04 09 324 7.1 -9 690.30 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 04 10 323 7.1 -9 690.30 -40.7 -40.7 -40.8 77 -99 SPO 1997 04 06 04 11 324 7.0 -9 690.30 -40.7 -40.7 -40.8 77 -99 SPO 1997 04 06 04 12 328 7.0 -9 690.30 -40.7 -40.7 -40.8 77 -99 SPO 1997 04 06 04 13 330 6.8 -9 690.30 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 04 14 327 7.3 -9 690.30 -40.8 -40.9 -40.9 78 -99 SPO 1997 04 06 04 15 330 7.1 -9 690.30 -40.8 -40.9 -40.9 78 -99 SPO 1997 04 06 04 16 326 7.2 -9 690.30 -40.8 -41.0 -41.0 76 -99 SPO 1997 04 06 04 17 325 7.0 -9 690.30 -40.8 -41.0 -41.0 75 -99 SPO 1997 04 06 04 18 327 7.0 -9 690.30 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 04 19 326 6.9 -9 690.30 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 04 20 326 7.1 -9 690.30 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 21 326 7.1 -9 690.30 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 22 325 7.2 -9 690.30 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 23 325 7.3 -9 690.20 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 24 324 7.1 -9 690.20 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 25 324 7.2 -9 690.20 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 26 323 7.2 -9 690.20 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 27 324 7.3 -9 690.20 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 04 28 323 7.3 -9 690.20 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 04 29 324 7.8 -9 690.20 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 04 30 324 8.0 -9 690.10 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 04 31 325 8.1 -9 690.10 -41.0 -41.1 -41.0 75 -99 SPO 1997 04 06 04 32 326 8.0 -9 690.10 -41.0 -41.1 -41.0 75 -99 SPO 1997 04 06 04 33 324 8.3 -9 690.00 -41.0 -41.0 -41.0 75 -99 SPO 1997 04 06 04 34 323 8.4 -9 690.00 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 04 35 323 8.4 -9 690.00 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 04 36 325 8.4 -9 690.10 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 04 37 324 8.0 -9 690.10 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 04 38 323 8.4 -9 690.10 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 04 39 322 8.0 -9 690.10 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 04 40 322 7.9 -9 690.10 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 04 41 323 8.1 -9 690.10 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 04 42 324 7.6 -9 690.10 -41.1 -41.2 -41.1 78 -99 SPO 1997 04 06 04 43 324 8.0 -9 690.10 -41.1 -41.3 -41.2 78 -99 SPO 1997 04 06 04 44 325 7.9 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 45 323 7.6 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 46 323 7.6 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 47 325 7.6 -9 690.00 -41.1 -41.4 -41.2 74 -99 SPO 1997 04 06 04 48 324 7.9 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 49 322 8.0 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 50 322 7.9 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 51 323 7.9 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 52 322 7.8 -9 690.00 -41.1 -41.3 -41.2 74 -99 SPO 1997 04 06 04 53 320 7.4 -9 690.10 -41.1 -41.3 -41.2 76 -99 SPO 1997 04 06 04 54 321 7.4 -9 690.10 -41.1 -41.2 -41.1 76 -99 SPO 1997 04 06 04 55 320 7.5 -9 690.10 -41.1 -41.2 -41.1 76 -99 SPO 1997 04 06 04 56 321 7.7 -9 690.10 -41.1 -41.2 -41.1 76 -99 SPO 1997 04 06 04 57 321 7.7 -9 690.10 -41.1 -41.2 -41.1 76 -99 SPO 1997 04 06 04 58 320 7.5 -9 690.10 -41.1 -41.2 -41.1 74 -99 SPO 1997 04 06 04 59 321 7.5 -9 690.10 -41.1 -41.2 -41.1 74 -99 SPO 1997 04 06 05 00 322 7.5 -9 690.10 -41.1 -41.2 -41.1 74 0 SPO 1997 04 06 05 01 323 7.3 -9 690.10 -41.1 -41.2 -41.1 74 -99 SPO 1997 04 06 05 02 323 7.2 -9 690.10 -41.1 -41.2 -41.1 74 -99 SPO 1997 04 06 05 03 322 7.1 -9 690.10 -41.1 -41.2 -41.1 76 -99 SPO 1997 04 06 05 04 322 7.3 -9 690.10 -41.1 -41.2 -41.1 76 -99 SPO 1997 04 06 05 05 323 7.4 -9 690.10 -41.1 -41.2 -41.1 78 -99 SPO 1997 04 06 05 06 323 7.0 -9 690.10 -41.1 -41.2 -41.1 78 -99 SPO 1997 04 06 05 07 322 6.8 -9 690.10 -41.0 -41.3 -41.1 78 -99 SPO 1997 04 06 05 08 321 7.0 -9 690.10 -41.1 -41.3 -41.1 78 -99 SPO 1997 04 06 05 09 321 6.9 -9 690.10 -41.1 -41.3 -41.1 78 -99 SPO 1997 04 06 05 10 321 7.2 -9 690.10 -41.1 -41.2 -41.1 78 -99 SPO 1997 04 06 05 11 320 7.3 -9 690.00 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 05 12 318 7.6 -9 690.00 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 05 13 319 7.6 -9 690.00 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 05 14 319 7.1 -9 689.90 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 05 15 320 7.5 -9 689.90 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 05 16 320 7.3 -9 689.90 -41.0 -41.2 -41.1 78 -99 SPO 1997 04 06 05 17 320 8.1 -9 689.90 -41.0 -41.2 -41.1 77 -99 SPO 1997 04 06 05 18 318 8.0 -9 689.90 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 05 19 318 7.9 -9 689.90 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 05 20 320 7.7 -9 689.90 -41.0 -41.1 -41.1 77 -99 SPO 1997 04 06 05 21 323 7.8 -9 689.80 -41.0 -41.1 -41.0 78 -99 SPO 1997 04 06 05 22 319 7.8 -9 689.80 -41.0 -41.1 -41.0 78 -99 SPO 1997 04 06 05 23 316 8.2 -9 689.80 -41.0 -41.1 -41.0 78 -99 SPO 1997 04 06 05 24 317 8.0 -9 689.80 -41.0 -41.1 -41.0 77 -99 SPO 1997 04 06 05 25 317 7.7 -9 689.80 -40.9 -41.1 -41.0 76 -99 SPO 1997 04 06 05 26 316 8.0 -9 689.80 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 05 27 319 7.7 -9 689.80 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 05 28 317 8.0 -9 689.80 -40.9 -41.0 -40.9 76 -99 SPO 1997 04 06 05 29 317 7.7 -9 689.80 -40.9 -41.1 -40.9 77 -99 SPO 1997 04 06 05 30 317 7.8 -9 689.80 -40.9 -41.1 -41.0 77 -99 SPO 1997 04 06 05 31 319 7.6 -9 689.80 -40.9 -41.1 -40.9 78 -99 SPO 1997 04 06 05 32 318 7.8 -9 689.80 -40.9 -41.0 -40.9 78 -99 SPO 1997 04 06 05 33 318 7.8 -9 689.80 -40.8 -41.0 -40.9 78 -99 SPO 1997 04 06 05 34 319 8.1 -9 689.70 -40.8 -41.0 -40.9 78 -99 SPO 1997 04 06 05 35 318 7.8 -9 689.70 -40.8 -41.0 -40.9 78 -99 SPO 1997 04 06 05 36 317 8.0 -9 689.70 -40.8 -41.0 -40.8 78 -99 SPO 1997 04 06 05 37 317 8.0 -9 689.80 -40.8 -40.9 -40.8 78 -99 SPO 1997 04 06 05 38 317 7.9 -9 689.80 -40.8 -40.9 -40.8 78 -99 SPO 1997 04 06 05 39 316 7.8 -9 689.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 05 40 315 7.4 -9 689.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 05 41 316 7.8 -9 689.80 -40.7 -40.8 -40.8 75 -99 SPO 1997 04 06 05 42 317 8.0 -9 689.80 -40.7 -40.8 -40.7 75 -99 SPO 1997 04 06 05 43 315 8.3 -9 689.80 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 05 44 316 8.5 -9 689.80 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 05 45 317 8.4 -9 689.70 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 05 46 317 8.2 -9 689.70 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 05 47 318 8.4 -9 689.70 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 05 48 318 8.0 -9 689.70 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 05 49 317 8.4 -9 689.80 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 05 50 319 8.2 -9 689.70 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 05 51 320 8.6 -9 689.70 -40.7 -40.9 -40.7 77 -99 SPO 1997 04 06 05 52 319 8.3 -9 689.70 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 05 53 319 8.6 -9 689.80 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 05 54 319 8.6 -9 689.80 -40.7 -40.9 -40.7 77 -99 SPO 1997 04 06 05 55 319 8.1 -9 689.80 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 05 56 318 8.3 -9 689.80 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 05 57 318 8.0 -9 689.80 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 05 58 318 7.8 -9 689.80 -40.7 -40.9 -40.8 77 -99 SPO 1997 04 06 05 59 318 7.8 -9 689.80 -40.7 -40.9 -40.8 79 -99 SPO 1997 04 06 06 00 319 7.5 -9 689.90 -40.7 -40.8 -40.8 79 0 SPO 1997 04 06 06 01 320 7.8 -9 689.80 -40.7 -40.8 -40.8 79 -99 SPO 1997 04 06 06 02 320 7.5 -9 689.80 -40.7 -40.8 -40.8 79 -99 SPO 1997 04 06 06 03 320 7.3 -9 689.80 -40.7 -40.8 -40.8 79 -99 SPO 1997 04 06 06 04 321 7.3 -9 689.80 -40.7 -40.8 -40.8 79 -99 SPO 1997 04 06 06 05 321 7.8 -9 689.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 06 321 7.9 -9 689.80 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 07 322 8.0 -9 689.80 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 06 08 322 7.8 -9 689.80 -40.7 -40.7 -40.7 75 -99 SPO 1997 04 06 06 09 320 7.8 -9 689.80 -40.7 -40.7 -40.7 75 -99 SPO 1997 04 06 06 10 320 8.3 -9 689.70 -40.6 -40.7 -40.7 74 -99 SPO 1997 04 06 06 11 319 8.0 -9 689.70 -40.6 -40.7 -40.7 76 -99 SPO 1997 04 06 06 12 319 8.3 -9 689.70 -40.6 -40.7 -40.6 76 -99 SPO 1997 04 06 06 13 319 8.5 -9 689.70 -40.6 -40.7 -40.6 76 -99 SPO 1997 04 06 06 14 319 8.5 -9 689.70 -40.6 -40.8 -40.6 78 -99 SPO 1997 04 06 06 15 319 8.3 -9 689.70 -40.6 -40.8 -40.6 78 -99 SPO 1997 04 06 06 16 320 8.0 -9 689.70 -40.6 -40.8 -40.6 78 -99 SPO 1997 04 06 06 17 320 8.2 -9 689.70 -40.6 -40.8 -40.7 78 -99 SPO 1997 04 06 06 18 320 8.0 -9 689.70 -40.6 -40.8 -40.7 78 -99 SPO 1997 04 06 06 19 321 8.5 -9 689.70 -40.6 -40.8 -40.7 76 -99 SPO 1997 04 06 06 20 321 8.6 -9 689.60 -40.6 -40.8 -40.7 76 -99 SPO 1997 04 06 06 21 321 8.7 -9 689.60 -40.6 -40.8 -40.7 76 -99 SPO 1997 04 06 06 22 320 8.8 -9 689.60 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 06 23 320 8.6 -9 689.60 -40.7 -40.8 -40.8 75 -99 SPO 1997 04 06 06 24 320 8.8 -9 689.60 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 25 320 8.7 -9 689.50 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 06 26 321 8.2 -9 689.50 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 06 27 320 8.9 -9 689.50 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 06 28 322 8.5 -9 689.50 -40.7 -40.8 -40.7 77 -99 SPO 1997 04 06 06 29 322 8.8 -9 689.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 30 322 9.1 -9 689.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 31 321 9.1 -9 689.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 32 321 8.9 -9 689.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 33 322 8.6 -9 689.40 -40.7 -40.8 -40.8 77 -99 SPO 1997 04 06 06 34 320 8.8 -9 689.40 -40.7 -40.8 -40.8 75 -99 SPO 1997 04 06 06 35 322 8.4 -9 689.40 -40.7 -40.9 -40.8 74 -99 SPO 1997 04 06 06 36 321 8.4 -9 689.40 -40.8 -41.0 -40.8 76 -99 SPO 1997 04 06 06 37 320 8.2 -9 689.40 -40.8 -41.0 -40.9 76 -99 SPO 1997 04 06 06 38 321 8.6 -9 689.40 -40.8 -41.0 -40.9 76 -99 SPO 1997 04 06 06 39 320 8.7 -9 689.40 -40.8 -41.0 -40.9 76 -99 SPO 1997 04 06 06 40 321 8.5 -9 689.50 -40.8 -41.1 -40.9 76 -99 SPO 1997 04 06 06 41 320 8.5 -9 689.40 -40.9 -41.1 -40.9 77 -99 SPO 1997 04 06 06 42 321 8.7 -9 689.40 -40.8 -41.1 -40.9 76 -99 SPO 1997 04 06 06 43 321 8.3 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 06 44 321 8.4 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 06 45 322 8.6 -9 689.40 -40.9 -41.0 -40.9 77 -99 SPO 1997 04 06 06 46 323 8.4 -9 689.40 -40.9 -41.0 -41.0 77 -99 SPO 1997 04 06 06 47 322 7.9 -9 689.40 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 06 48 323 7.9 -9 689.40 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 06 49 325 8.1 -9 689.40 -40.9 -41.0 -41.0 74 -99 SPO 1997 04 06 06 50 325 8.3 -9 689.40 -40.9 -41.0 -41.0 74 -99 SPO 1997 04 06 06 51 324 8.7 -9 689.40 -40.9 -41.0 -41.0 76 -99 SPO 1997 04 06 06 52 324 8.8 -9 689.40 -40.9 -40.9 -40.9 76 -99 SPO 1997 04 06 06 53 325 8.7 -9 689.40 -40.8 -40.9 -40.9 76 -99 SPO 1997 04 06 06 54 326 8.8 -9 689.40 -40.8 -40.9 -40.9 76 -99 SPO 1997 04 06 06 55 325 8.8 -9 689.40 -40.8 -40.9 -40.9 76 -99 SPO 1997 04 06 06 56 324 8.7 -9 689.40 -40.8 -40.9 -40.9 78 -99 SPO 1997 04 06 06 57 325 8.7 -9 689.40 -40.8 -40.9 -40.9 76 -99 SPO 1997 04 06 06 58 324 8.7 -9 689.40 -40.8 -40.9 -40.9 75 -99 SPO 1997 04 06 06 59 325 8.9 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 00 325 8.8 -9 689.40 -40.8 -41.0 -40.9 75 0 SPO 1997 04 06 07 01 326 8.4 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 02 326 8.1 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 03 324 8.7 -9 689.40 -40.8 -41.0 -40.9 74 -99 SPO 1997 04 06 07 04 325 8.4 -9 689.40 -40.8 -41.0 -40.9 74 -99 SPO 1997 04 06 07 05 325 8.6 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 06 325 8.7 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 07 324 8.3 -9 689.40 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 08 324 8.2 -9 689.30 -40.9 -41.0 -40.9 76 -99 SPO 1997 04 06 07 09 324 8.2 -9 689.30 -40.9 -41.0 -40.9 76 -99 SPO 1997 04 06 07 10 324 8.3 -9 689.30 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 11 323 8.3 -9 689.30 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 12 323 7.8 -9 689.30 -40.9 -41.0 -40.9 76 -99 SPO 1997 04 06 07 13 323 8.0 -9 689.30 -40.9 -41.0 -40.9 76 -99 SPO 1997 04 06 07 14 323 8.1 -9 689.30 -40.8 -41.0 -41.0 75 -99 SPO 1997 04 06 07 15 323 8.0 -9 689.30 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 16 324 8.3 -9 689.30 -40.8 -41.0 -40.9 74 -99 SPO 1997 04 06 07 17 323 8.3 -9 689.30 -40.8 -40.9 -40.9 74 -99 SPO 1997 04 06 07 18 323 8.3 -9 689.20 -40.8 -40.9 -40.9 74 -99 SPO 1997 04 06 07 19 323 8.4 -9 689.20 -40.8 -40.9 -40.9 75 -99 SPO 1997 04 06 07 20 322 8.2 -9 689.20 -40.8 -40.9 -40.9 74 -99 SPO 1997 04 06 07 21 322 8.9 -9 689.20 -40.8 -40.9 -40.9 75 -99 SPO 1997 04 06 07 22 322 8.4 -9 689.20 -40.8 -41.0 -40.9 75 -99 SPO 1997 04 06 07 23 323 8.7 -9 689.20 -40.8 -40.9 -40.9 76 -99 SPO 1997 04 06 07 24 322 8.7 -9 689.10 -40.8 -40.9 -40.9 76 -99 SPO 1997 04 06 07 25 321 8.7 -9 689.10 -40.8 -40.9 -40.8 76 -99 SPO 1997 04 06 07 26 320 8.6 -9 689.10 -40.8 -40.9 -40.8 76 -99 SPO 1997 04 06 07 27 319 8.3 -9 689.10 -40.8 -40.9 -40.8 76 -99 SPO 1997 04 06 07 28 318 8.5 -9 689.10 -40.7 -40.8 -40.8 75 -99 SPO 1997 04 06 07 29 317 8.7 -9 689.10 -40.7 -40.8 -40.7 74 -99 SPO 1997 04 06 07 30 317 8.8 -9 689.10 -40.7 -40.7 -40.7 74 -99 SPO 1997 04 06 07 31 316 8.6 -9 689.10 -40.6 -40.7 -40.6 74 -99 SPO 1997 04 06 07 32 317 8.7 -9 689.10 -40.6 -40.6 -40.6 74 -99 SPO 1997 04 06 07 33 316 9.0 -9 689.10 -40.6 -40.6 -40.6 74 -99 SPO 1997 04 06 07 34 316 9.1 -9 689.10 -40.5 -40.6 -40.6 74 -99 SPO 1997 04 06 07 35 316 8.9 -9 689.00 -40.5 -40.5 -40.6 75 -99 SPO 1997 04 06 07 36 317 8.9 -9 689.00 -40.5 -40.5 -40.5 75 -99 SPO 1997 04 06 07 37 316 8.6 -9 689.00 -40.5 -40.4 -40.5 75 -99 SPO 1997 04 06 07 38 316 8.7 -9 689.00 -40.4 -40.4 -40.5 76 -99 SPO 1997 04 06 07 39 317 8.6 -9 689.00 -40.4 -40.4 -40.5 76 -99 SPO 1997 04 06 07 40 317 8.7 -9 689.00 -40.4 -40.4 -40.5 76 -99 SPO 1997 04 06 07 41 319 8.3 -9 689.00 -40.4 -40.4 -40.5 76 -99 SPO 1997 04 06 07 42 321 8.6 -9 689.00 -40.4 -40.4 -40.6 74 -99 SPO 1997 04 06 07 43 322 8.3 -9 689.00 -40.5 -40.4 -40.6 75 -99 SPO 1997 04 06 07 44 323 8.3 -9 689.00 -40.5 -40.5 -40.6 75 -99 SPO 1997 04 06 07 45 324 8.0 -9 689.00 -40.6 -40.6 -40.7 76 -99 SPO 1997 04 06 07 46 324 7.7 -9 689.00 -40.6 -40.6 -40.6 76 -99 SPO 1997 04 06 07 47 324 7.6 -9 689.10 -40.6 -40.6 -40.6 76 -99 SPO 1997 04 06 07 48 325 7.7 -9 689.10 -40.5 -40.6 -40.6 75 -99 SPO 1997 04 06 07 49 325 7.8 -9 689.10 -40.5 -40.6 -40.6 75 -99 SPO 1997 04 06 07 50 323 7.5 -9 689.10 -40.5 -40.5 -40.5 77 -99 SPO 1997 04 06 07 51 323 7.8 -9 689.10 -40.4 -40.5 -40.5 76 -99 SPO 1997 04 06 07 52 322 8.1 -9 689.10 -40.4 -40.4 -40.4 76 -99 SPO 1997 04 06 07 53 322 8.3 -9 689.10 -40.3 -40.3 -40.3 75 -99 SPO 1997 04 06 07 54 322 8.6 -9 689.00 -40.3 -40.2 -40.3 75 -99 SPO 1997 04 06 07 55 322 8.8 -9 689.00 -40.2 -40.1 -40.2 75 -99 SPO 1997 04 06 07 56 323 8.8 -9 689.00 -40.2 -40.1 -40.2 75 -99 SPO 1997 04 06 07 57 322 8.6 -9 689.00 -40.2 -40.0 -40.2 75 -99 SPO 1997 04 06 07 58 322 8.4 -9 689.00 -40.1 -40.0 -40.2 74 -99 SPO 1997 04 06 07 59 322 7.9 -9 689.00 -40.1 -40.0 -40.1 74 -99 SPO 1997 04 06 08 00 322 8.0 -9 689.10 -40.1 -40.0 -40.1 75 0 SPO 1997 04 06 08 01 320 8.0 -9 689.10 -40.0 -40.0 -40.1 75 -99 SPO 1997 04 06 08 02 320 8.2 -9 689.10 -40.0 -39.9 -40.0 75 -99 SPO 1997 04 06 08 03 320 8.1 -9 689.10 -40.0 -39.9 -40.0 75 -99 SPO 1997 04 06 08 04 320 8.4 -9 689.10 -39.9 -39.8 -40.0 76 -99 SPO 1997 04 06 08 05 320 8.6 -9 689.10 -39.9 -39.8 -40.0 76 -99 SPO 1997 04 06 08 06 320 8.6 -9 689.00 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 07 321 8.5 -9 689.00 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 08 321 8.4 -9 689.10 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 09 320 7.9 -9 689.10 -39.8 -39.9 -39.9 75 -99 SPO 1997 04 06 08 10 320 7.5 -9 689.10 -39.8 -39.9 -39.9 75 -99 SPO 1997 04 06 08 11 319 7.6 -9 689.10 -39.8 -39.9 -39.9 75 -99 SPO 1997 04 06 08 12 319 7.3 -9 689.20 -39.8 -39.9 -39.8 75 -99 SPO 1997 04 06 08 13 319 7.0 -9 689.20 -39.8 -39.9 -39.8 75 -99 SPO 1997 04 06 08 14 319 7.0 -9 689.20 -39.8 -39.8 -39.8 75 -99 SPO 1997 04 06 08 15 320 6.9 -9 689.20 -39.8 -39.8 -39.8 76 -99 SPO 1997 04 06 08 16 320 6.5 -9 689.20 -39.7 -39.8 -39.8 75 -99 SPO 1997 04 06 08 17 320 6.6 -9 689.20 -39.7 -39.8 -39.8 75 -99 SPO 1997 04 06 08 18 319 6.6 -9 689.20 -39.7 -39.8 -39.8 77 -99 SPO 1997 04 06 08 19 319 6.5 -9 689.20 -39.7 -39.7 -39.8 77 -99 SPO 1997 04 06 08 20 318 6.7 -9 689.20 -39.7 -39.7 -39.8 77 -99 SPO 1997 04 06 08 21 318 7.0 -9 689.20 -39.7 -39.7 -39.8 77 -99 SPO 1997 04 06 08 22 319 7.2 -9 689.20 -39.7 -39.7 -39.8 77 -99 SPO 1997 04 06 08 23 319 7.4 -9 689.10 -39.7 -39.6 -39.8 77 -99 SPO 1997 04 06 08 24 319 7.6 -9 689.10 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 25 320 7.8 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 26 319 8.1 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 27 319 7.9 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 28 319 7.9 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 29 319 7.6 -9 689.20 -39.7 -39.6 -39.7 77 -99 SPO 1997 04 06 08 30 320 7.3 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 31 321 7.2 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 32 323 7.0 -9 689.20 -39.7 -39.7 -39.8 77 -99 SPO 1997 04 06 08 33 324 6.8 -9 689.20 -39.7 -39.8 -39.8 77 -99 SPO 1997 04 06 08 34 324 6.8 -9 689.30 -39.7 -39.8 -39.8 77 -99 SPO 1997 04 06 08 35 324 6.7 -9 689.30 -39.7 -39.8 -39.8 77 -99 SPO 1997 04 06 08 36 324 7.1 -9 689.30 -39.8 -39.8 -39.8 78 -99 SPO 1997 04 06 08 37 324 6.9 -9 689.30 -39.8 -39.8 -39.8 78 -99 SPO 1997 04 06 08 38 323 7.0 -9 689.20 -39.8 -39.8 -39.8 76 -99 SPO 1997 04 06 08 39 322 6.9 -9 689.20 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 40 323 6.9 -9 689.20 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 41 322 6.9 -9 689.20 -39.8 -39.8 -39.8 75 -99 SPO 1997 04 06 08 42 322 6.5 -9 689.20 -39.8 -39.7 -39.8 75 -99 SPO 1997 04 06 08 43 322 6.1 -9 689.30 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 44 322 5.9 -9 689.30 -39.8 -39.8 -39.9 75 -99 SPO 1997 04 06 08 45 320 5.6 -9 689.30 -39.8 -39.7 -39.8 76 -99 SPO 1997 04 06 08 46 322 5.5 -9 689.30 -39.8 -39.7 -39.8 76 -99 SPO 1997 04 06 08 47 323 5.5 -9 689.30 -39.8 -39.7 -39.8 76 -99 SPO 1997 04 06 08 48 324 5.6 -9 689.30 -39.8 -39.7 -39.8 76 -99 SPO 1997 04 06 08 49 323 5.6 -9 689.30 -39.8 -39.7 -39.8 78 -99 SPO 1997 04 06 08 50 322 6.1 -9 689.30 -39.8 -39.7 -39.8 78 -99 SPO 1997 04 06 08 51 323 6.0 -9 689.20 -39.8 -39.6 -39.8 76 -99 SPO 1997 04 06 08 52 323 6.5 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 53 324 6.8 -9 689.20 -39.7 -39.6 -39.8 75 -99 SPO 1997 04 06 08 54 324 7.2 -9 689.10 -39.7 -39.5 -39.7 73 -99 SPO 1997 04 06 08 55 325 7.4 -9 689.10 -39.7 -39.5 -39.7 73 -99 SPO 1997 04 06 08 56 325 7.4 -9 689.00 -39.7 -39.5 -39.7 75 -99 SPO 1997 04 06 08 57 327 7.8 -9 689.00 -39.6 -39.5 -39.7 75 -99 SPO 1997 04 06 08 58 328 7.8 -9 689.00 -39.6 -39.5 -39.7 76 -99 SPO 1997 04 06 08 59 329 8.0 -9 689.00 -39.7 -39.5 -39.8 77 -99 SPO 1997 04 06 09 00 330 8.0 -9 688.90 -39.7 -39.5 -39.8 77 0 SPO 1997 04 06 09 01 329 7.8 -9 688.90 -39.7 -39.5 -39.7 77 -99 SPO 1997 04 06 09 02 329 7.9 -9 688.90 -39.7 -39.5 -39.7 77 -99 SPO 1997 04 06 09 03 327 7.7 -9 688.90 -39.6 -39.5 -39.7 76 -99 SPO 1997 04 06 09 04 326 7.9 -9 688.90 -39.6 -39.4 -39.6 76 -99 SPO 1997 04 06 09 05 326 7.6 -9 688.90 -39.5 -39.3 -39.5 75 -99 SPO 1997 04 06 09 06 324 7.7 -9 688.90 -39.5 -39.3 -39.5 75 -99 SPO 1997 04 06 09 07 324 7.4 -9 689.00 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 08 328 6.9 -9 689.00 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 09 328 7.0 -9 689.00 -39.5 -39.4 -39.6 74 -99 SPO 1997 04 06 09 10 328 6.9 -9 689.00 -39.5 -39.4 -39.6 75 -99 SPO 1997 04 06 09 11 328 7.0 -9 689.00 -39.5 -39.3 -39.5 75 -99 SPO 1997 04 06 09 12 327 7.4 -9 689.00 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 13 327 7.5 -9 689.00 -39.4 -39.3 -39.4 75 -99 SPO 1997 04 06 09 14 327 7.2 -9 689.00 -39.4 -39.3 -39.4 75 -99 SPO 1997 04 06 09 15 328 7.2 -9 689.00 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 16 327 7.5 -9 689.00 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 17 329 7.6 -9 689.00 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 18 329 7.5 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 19 329 7.7 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 20 329 7.7 -9 689.00 -39.4 -39.4 -39.4 75 -99 SPO 1997 04 06 09 21 329 7.7 -9 689.00 -39.4 -39.4 -39.4 75 -99 SPO 1997 04 06 09 22 329 7.7 -9 688.90 -39.4 -39.4 -39.4 75 -99 SPO 1997 04 06 09 23 328 7.0 -9 689.00 -39.4 -39.4 -39.4 73 -99 SPO 1997 04 06 09 24 330 6.9 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 25 332 6.8 -9 689.00 -39.4 -39.5 -39.5 75 -99 SPO 1997 04 06 09 26 331 6.8 -9 689.00 -39.4 -39.5 -39.5 75 -99 SPO 1997 04 06 09 27 332 6.7 -9 689.00 -39.4 -39.5 -39.5 75 -99 SPO 1997 04 06 09 28 332 6.9 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 29 333 6.8 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 30 332 7.0 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 31 332 7.1 -9 689.00 -39.4 -39.4 -39.5 75 -99 SPO 1997 04 06 09 32 332 7.2 -9 689.00 -39.4 -39.4 -39.4 75 -99 SPO 1997 04 06 09 33 332 7.2 -9 689.00 -39.4 -39.3 -39.4 75 -99 SPO 1997 04 06 09 34 332 7.2 -9 689.00 -39.4 -39.3 -39.4 75 -99 SPO 1997 04 06 09 35 332 7.1 -9 689.00 -39.4 -39.3 -39.4 75 -99 SPO 1997 04 06 09 36 330 7.2 -9 689.00 -39.4 -39.3 -39.4 75 -99 SPO 1997 04 06 09 37 327 7.5 -9 689.00 -39.4 -39.2 -39.4 75 -99 SPO 1997 04 06 09 38 325 7.8 -9 688.90 -39.3 -39.2 -39.3 72 -99 SPO 1997 04 06 09 39 323 8.1 -9 688.90 -39.2 -39.1 -39.2 73 -99 SPO 1997 04 06 09 40 321 8.6 -9 688.80 -39.2 -39.0 -39.2 73 -99 SPO 1997 04 06 09 41 323 8.0 -9 688.80 -39.1 -39.0 -39.1 72 -99 SPO 1997 04 06 09 42 324 8.2 -9 688.80 -39.1 -39.1 -39.2 72 -99 SPO 1997 04 06 09 43 325 8.2 -9 688.80 -39.2 -39.1 -39.2 73 -99 SPO 1997 04 06 09 44 326 8.3 -9 688.80 -39.2 -39.2 -39.4 73 -99 SPO 1997 04 06 09 45 326 8.6 -9 688.70 -39.3 -39.2 -39.4 76 -99 SPO 1997 04 06 09 46 325 8.4 -9 688.70 -39.4 -39.2 -39.5 76 -99 SPO 1997 04 06 09 47 325 8.3 -9 688.70 -39.4 -39.3 -39.5 76 -99 SPO 1997 04 06 09 48 325 8.9 -9 688.60 -39.4 -39.3 -39.5 76 -99 SPO 1997 04 06 09 49 324 8.8 -9 688.60 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 50 324 8.8 -9 688.60 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 51 324 8.8 -9 688.60 -39.4 -39.3 -39.5 75 -99 SPO 1997 04 06 09 52 323 8.8 -9 688.60 -39.4 -39.2 -39.5 75 -99 SPO 1997 04 06 09 53 323 8.7 -9 688.60 -39.4 -39.2 -39.5 75 -99 SPO 1997 04 06 09 54 321 8.7 -9 688.60 -39.4 -39.2 -39.5 75 -99 SPO 1997 04 06 09 55 321 8.6 -9 688.60 -39.4 -39.2 -39.4 75 -99 SPO 1997 04 06 09 56 322 8.9 -9 688.50 -39.4 -39.2 -39.4 75 -99 SPO 1997 04 06 09 57 323 9.0 -9 688.50 -39.3 -39.1 -39.4 74 -99 SPO 1997 04 06 09 58 322 9.1 -9 688.40 -39.3 -39.0 -39.4 74 -99 SPO 1997 04 06 09 59 322 8.9 -9 688.40 -39.3 -39.0 -39.3 74 -99 SPO 1997 04 06 10 00 323 9.0 -9 688.30 -39.3 -39.0 -39.3 76 0 SPO 1997 04 06 10 01 323 9.0 -9 688.20 -39.2 -39.0 -39.3 75 -99 SPO 1997 04 06 10 02 322 9.2 -9 688.20 -39.2 -39.0 -39.3 75 -99 SPO 1997 04 06 10 03 323 9.0 -9 688.10 -39.2 -39.0 -39.2 75 -99 SPO 1997 04 06 10 04 322 9.1 -9 688.10 -39.2 -39.0 -39.2 73 -99 SPO 1997 04 06 10 05 322 9.2 -9 688.10 -39.2 -39.0 -39.2 73 -99 SPO 1997 04 06 10 06 322 9.1 -9 688.10 -39.1 -39.0 -39.1 72 -99 SPO 1997 04 06 10 07 323 8.4 -9 688.10 -39.1 -39.0 -39.1 75 -99 SPO 1997 04 06 10 08 325 8.3 -9 688.10 -39.1 -39.0 -39.1 76 -99 SPO 1997 04 06 10 09 325 8.3 -9 688.20 -39.1 -39.0 -39.1 76 -99 SPO 1997 04 06 10 10 323 8.2 -9 688.20 -39.1 -39.0 -39.0 76 -99 SPO 1997 04 06 10 11 322 8.3 -9 688.30 -39.0 -38.9 -39.0 76 -99 SPO 1997 04 06 10 12 320 8.3 -9 688.30 -38.9 -38.9 -38.9 75 -99 SPO 1997 04 06 10 13 319 8.4 -9 688.40 -38.9 -38.9 -38.9 75 -99 SPO 1997 04 06 10 14 319 8.5 -9 688.40 -38.8 -38.9 -38.8 76 -99 SPO 1997 04 06 10 15 320 8.5 -9 688.40 -38.8 -38.8 -38.9 76 -99 SPO 1997 04 06 10 16 320 8.5 -9 688.40 -38.8 -38.8 -38.8 76 -99 SPO 1997 04 06 10 17 319 8.5 -9 688.30 -38.8 -38.8 -38.8 76 -99 SPO 1997 04 06 10 18 321 8.7 -9 688.30 -38.7 -38.8 -38.8 75 -99 SPO 1997 04 06 10 19 322 8.5 -9 688.30 -38.7 -38.8 -38.8 75 -99 SPO 1997 04 06 10 20 322 8.4 -9 688.20 -38.7 -38.8 -38.8 75 -99 SPO 1997 04 06 10 21 323 8.9 -9 688.20 -38.7 -38.8 -38.8 75 -99 SPO 1997 04 06 10 22 322 8.9 -9 688.20 -38.7 -38.8 -38.8 76 -99 SPO 1997 04 06 10 23 322 9.0 -9 688.30 -38.7 -38.8 -38.8 76 -99 SPO 1997 04 06 10 24 324 8.4 -9 688.30 -38.7 -38.7 -38.8 77 -99 SPO 1997 04 06 10 25 324 8.7 -9 688.30 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 10 26 324 8.6 -9 688.30 -38.7 -38.7 -38.8 77 -99 SPO 1997 04 06 10 27 325 8.4 -9 688.30 -38.7 -38.7 -38.7 77 -99 SPO 1997 04 06 10 28 325 8.3 -9 688.30 -38.7 -38.7 -38.8 77 -99 SPO 1997 04 06 10 29 325 8.1 -9 688.30 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 10 30 326 7.9 -9 688.20 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 10 31 325 8.1 -9 688.20 -38.7 -38.8 -38.8 79 -99 SPO 1997 04 06 10 32 325 7.9 -9 688.20 -38.7 -38.9 -38.8 77 -99 SPO 1997 04 06 10 33 326 7.9 -9 688.20 -38.7 -38.9 -38.8 77 -99 SPO 1997 04 06 10 34 327 7.5 -9 688.20 -38.7 -38.9 -38.8 76 -99 SPO 1997 04 06 10 35 326 7.8 -9 688.20 -38.7 -38.8 -38.8 76 -99 SPO 1997 04 06 10 36 325 7.7 -9 688.20 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 10 37 325 8.1 -9 688.20 -38.7 -38.8 -38.7 77 -99 SPO 1997 04 06 10 38 324 7.9 -9 688.20 -38.7 -38.8 -38.7 77 -99 SPO 1997 04 06 10 39 322 7.9 -9 688.10 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 40 322 8.0 -9 688.10 -38.6 -38.7 -38.6 76 -99 SPO 1997 04 06 10 41 324 8.2 -9 688.10 -38.6 -38.7 -38.6 76 -99 SPO 1997 04 06 10 42 323 7.9 -9 688.10 -38.6 -38.7 -38.6 76 -99 SPO 1997 04 06 10 43 327 7.3 -9 688.10 -38.6 -38.7 -38.6 76 -99 SPO 1997 04 06 10 44 324 7.5 -9 688.10 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 45 325 8.2 -9 688.10 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 46 324 8.6 -9 688.00 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 47 322 8.9 -9 688.00 -38.6 -38.7 -38.7 75 -99 SPO 1997 04 06 10 48 323 8.5 -9 688.00 -38.6 -38.7 -38.7 75 -99 SPO 1997 04 06 10 49 323 8.3 -9 688.10 -38.6 -38.7 -38.7 75 -99 SPO 1997 04 06 10 50 323 8.7 -9 688.00 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 51 323 8.9 -9 688.00 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 52 322 8.7 -9 688.00 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 53 321 8.8 -9 688.10 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 10 54 322 8.9 -9 688.10 -38.6 -38.8 -38.7 76 -99 SPO 1997 04 06 10 55 320 9.2 -9 688.00 -38.6 -38.8 -38.7 76 -99 SPO 1997 04 06 10 56 320 9.4 -9 688.00 -38.6 -38.7 -38.6 76 -99 SPO 1997 04 06 10 57 319 9.8 -9 688.00 -38.6 -38.7 -38.6 76 -99 SPO 1997 04 06 10 58 317 9.8 -9 687.90 -38.6 -38.6 -38.6 76 -99 SPO 1997 04 06 10 59 317 9.9 -9 687.90 -38.6 -38.6 -38.6 76 -99 SPO 1997 04 06 11 00 315 9.7 -9 687.90 -38.6 -38.6 -38.5 76 0 SPO 1997 04 06 11 01 316 9.8 -9 688.00 -38.4 -38.5 -38.5 73 -99 SPO 1997 04 06 11 02 316 9.5 -9 688.00 -38.4 -38.5 -38.5 73 -99 SPO 1997 04 06 11 03 317 9.1 -9 688.00 -38.5 -38.6 -38.5 74 -99 SPO 1997 04 06 11 04 317 8.8 -9 688.00 -38.5 -38.6 -38.6 74 -99 SPO 1997 04 06 11 05 317 9.4 -9 688.00 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 11 06 317 9.3 -9 688.00 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 11 07 320 9.0 -9 687.90 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 11 08 319 8.8 -9 687.90 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 11 09 317 9.1 -9 687.90 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 11 10 319 9.1 -9 687.90 -38.5 -38.5 -38.5 76 -99 SPO 1997 04 06 11 11 318 9.7 -9 687.90 -38.5 -38.4 -38.5 76 -99 SPO 1997 04 06 11 12 318 9.7 -9 687.90 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 11 13 319 9.0 -9 687.90 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 11 14 318 9.4 -9 687.80 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 11 15 318 9.4 -9 687.80 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 11 16 318 9.7 -9 687.80 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 11 17 316 9.7 -9 687.80 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 11 18 317 8.6 -9 687.80 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 11 19 319 9.2 -9 687.80 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 20 318 8.9 -9 687.80 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 21 317 9.0 -9 687.80 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 11 22 316 8.7 -9 687.70 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 11 23 318 8.9 -9 687.80 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 11 24 320 9.3 -9 687.80 -38.4 -38.4 -38.5 79 -99 SPO 1997 04 06 11 25 320 8.9 -9 687.80 -38.4 -38.4 -38.4 77 -99 SPO 1997 04 06 11 26 323 9.0 -9 687.80 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 11 27 325 8.6 -9 687.80 -38.3 -38.4 -38.4 78 -99 SPO 1997 04 06 11 28 323 8.6 -9 687.80 -38.4 -38.4 -38.4 79 -99 SPO 1997 04 06 11 29 322 8.9 -9 687.90 -38.4 -38.5 -38.4 77 -99 SPO 1997 04 06 11 30 323 8.7 -9 687.90 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 11 31 324 8.8 -9 687.90 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 11 32 321 8.5 -9 687.90 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 33 321 8.6 -9 687.90 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 34 320 8.9 -9 687.90 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 35 321 8.6 -9 687.80 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 11 36 318 9.1 -9 687.80 -38.2 -38.2 -38.2 76 -99 SPO 1997 04 06 11 37 318 8.7 -9 687.80 -38.2 -38.2 -38.2 76 -99 SPO 1997 04 06 11 38 320 8.4 -9 687.80 -38.2 -38.2 -38.2 76 -99 SPO 1997 04 06 11 39 321 8.8 -9 687.80 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 11 40 325 8.7 -9 687.80 -38.2 -38.2 -38.3 75 -99 SPO 1997 04 06 11 41 324 8.8 -9 687.80 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 11 42 322 8.5 -9 687.80 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 11 43 324 8.9 -9 687.80 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 11 44 322 8.5 -9 687.80 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 45 323 8.5 -9 687.70 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 46 324 8.5 -9 687.70 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 11 47 323 9.3 -9 687.70 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 11 48 322 9.0 -9 687.60 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 11 49 323 9.6 -9 687.60 -38.4 -38.5 -38.5 76 -99 SPO 1997 04 06 11 50 320 8.9 -9 687.60 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 11 51 322 8.8 -9 687.60 -38.4 -38.4 -38.5 75 -99 SPO 1997 04 06 11 52 323 8.9 -9 687.60 -38.4 -38.5 -38.5 75 -99 SPO 1997 04 06 11 53 324 8.7 -9 687.60 -38.4 -38.4 -38.5 75 -99 SPO 1997 04 06 11 54 324 9.0 -9 687.60 -38.4 -38.4 -38.5 75 -99 SPO 1997 04 06 11 55 324 8.3 -9 687.60 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 11 56 324 8.2 -9 687.60 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 11 57 328 8.0 -9 687.60 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 11 58 329 7.7 -9 687.60 -38.4 -38.4 -38.5 75 -99 SPO 1997 04 06 11 59 332 7.4 -9 687.60 -38.4 -38.4 -38.5 75 -99 SPO 1997 04 06 12 00 334 7.5 -9 687.70 -38.4 -38.5 -38.6 75 0 SPO 1997 04 06 12 01 334 7.5 -9 687.70 -38.5 -38.5 -38.5 76 -99 SPO 1997 04 06 12 02 331 7.8 -9 687.70 -38.5 -38.5 -38.5 76 -99 SPO 1997 04 06 12 03 332 7.6 -9 687.80 -38.5 -38.5 -38.5 76 -99 SPO 1997 04 06 12 04 335 6.9 -9 687.80 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 12 05 333 7.3 -9 687.80 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 12 06 327 7.5 -9 687.80 -38.5 -38.5 -38.5 76 -99 SPO 1997 04 06 12 07 328 7.2 -9 687.80 -38.5 -38.6 -38.5 76 -99 SPO 1997 04 06 12 08 331 7.0 -9 687.80 -38.4 -38.6 -38.5 76 -99 SPO 1997 04 06 12 09 335 7.1 -9 687.80 -38.4 -38.6 -38.5 76 -99 SPO 1997 04 06 12 10 338 7.3 -9 687.80 -38.4 -38.7 -38.6 76 -99 SPO 1997 04 06 12 11 337 7.3 -9 687.80 -38.5 -38.7 -38.6 77 -99 SPO 1997 04 06 12 12 336 7.5 -9 687.80 -38.5 -38.8 -38.7 77 -99 SPO 1997 04 06 12 13 338 7.3 -9 687.80 -38.6 -38.8 -38.7 78 -99 SPO 1997 04 06 12 14 339 6.9 -9 687.80 -38.6 -38.8 -38.7 76 -99 SPO 1997 04 06 12 15 338 7.4 -9 687.80 -38.6 -38.8 -38.8 76 -99 SPO 1997 04 06 12 16 339 7.2 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 17 340 7.0 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 18 340 7.2 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 19 340 6.8 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 20 341 6.6 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 21 340 6.4 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 22 341 6.6 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 23 343 6.5 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 24 341 7.4 -9 687.80 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 25 342 7.3 -9 687.70 -38.7 -38.8 -38.8 77 -99 SPO 1997 04 06 12 26 341 7.6 -9 687.70 -38.7 -38.8 -38.7 77 -99 SPO 1997 04 06 12 27 339 7.2 -9 687.70 -38.7 -38.7 -38.8 77 -99 SPO 1997 04 06 12 28 339 7.0 -9 687.70 -38.7 -38.7 -38.8 75 -99 SPO 1997 04 06 12 29 336 7.3 -9 687.70 -38.7 -38.8 -38.8 75 -99 SPO 1997 04 06 12 30 334 7.1 -9 687.60 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 06 12 31 333 7.4 -9 687.60 -38.7 -38.8 -38.8 75 -99 SPO 1997 04 06 12 32 332 7.7 -9 687.60 -38.7 -38.8 -38.7 76 -99 SPO 1997 04 06 12 33 332 7.5 -9 687.60 -38.7 -38.8 -38.7 76 -99 SPO 1997 04 06 12 34 330 7.7 -9 687.60 -38.6 -38.8 -38.7 75 -99 SPO 1997 04 06 12 35 329 7.8 -9 687.60 -38.6 -38.8 -38.7 75 -99 SPO 1997 04 06 12 36 328 7.7 -9 687.60 -38.6 -38.8 -38.7 76 -99 SPO 1997 04 06 12 37 325 7.7 -9 687.60 -38.6 -38.8 -38.7 76 -99 SPO 1997 04 06 12 38 327 7.9 -9 687.60 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 12 39 327 8.0 -9 687.60 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 12 40 326 7.6 -9 687.60 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 12 41 325 7.8 -9 687.60 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 12 42 324 7.5 -9 687.60 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 12 43 323 7.7 -9 687.70 -38.6 -38.7 -38.7 76 -99 SPO 1997 04 06 12 44 323 7.9 -9 687.70 -38.6 -38.7 -38.7 75 -99 SPO 1997 04 06 12 45 323 7.7 -9 687.70 -38.6 -38.6 -38.6 75 -99 SPO 1997 04 06 12 46 320 7.3 -9 687.70 -38.6 -38.6 -38.7 76 -99 SPO 1997 04 06 12 47 321 7.6 -9 687.70 -38.6 -38.6 -38.6 76 -99 SPO 1997 04 06 12 48 321 7.5 -9 687.70 -38.6 -38.6 -38.6 76 -99 SPO 1997 04 06 12 49 321 7.6 -9 687.70 -38.6 -38.6 -38.6 76 -99 SPO 1997 04 06 12 50 319 7.8 -9 687.70 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 12 51 319 8.0 -9 687.70 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 12 52 318 7.9 -9 687.70 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 12 53 317 7.7 -9 687.70 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 12 54 316 8.0 -9 687.70 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 12 55 316 7.9 -9 687.70 -38.5 -38.5 -38.6 76 -99 SPO 1997 04 06 12 56 314 7.9 -9 687.70 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 12 57 314 7.8 -9 687.60 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 12 58 315 7.8 -9 687.60 -38.5 -38.7 -38.6 76 -99 SPO 1997 04 06 12 59 315 8.4 -9 687.60 -38.5 -38.6 -38.6 76 -99 SPO 1997 04 06 13 00 313 8.7 -9 687.60 -38.5 -38.6 -38.6 77 0 SPO 1997 04 06 13 01 312 8.7 -9 687.60 -38.5 -38.6 -38.5 77 -99 SPO 1997 04 06 13 02 311 8.1 -9 687.60 -38.5 -38.5 -38.5 77 -99 SPO 1997 04 06 13 03 310 8.2 -9 687.60 -38.5 -38.5 -38.6 77 -99 SPO 1997 04 06 13 04 309 7.7 -9 687.60 -38.5 -38.5 -38.5 77 -99 SPO 1997 04 06 13 05 309 8.2 -9 687.60 -38.5 -38.5 -38.5 77 -99 SPO 1997 04 06 13 06 308 8.0 -9 687.60 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 13 07 310 8.1 -9 687.60 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 13 08 310 8.6 -9 687.60 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 13 09 309 7.9 -9 687.60 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 13 10 310 7.8 -9 687.60 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 13 11 310 7.7 -9 687.50 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 13 12 312 8.3 -9 687.50 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 13 13 313 8.4 -9 687.50 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 13 14 311 8.6 -9 687.40 -38.3 -38.2 -38.3 76 -99 SPO 1997 04 06 13 15 311 8.4 -9 687.40 -38.3 -38.2 -38.3 76 -99 SPO 1997 04 06 13 16 310 8.2 -9 687.40 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 13 17 312 8.1 -9 687.40 -38.2 -38.2 -38.3 75 -99 SPO 1997 04 06 13 18 310 8.6 -9 687.40 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 13 19 309 8.3 -9 687.40 -38.2 -38.2 -38.3 77 -99 SPO 1997 04 06 13 20 310 8.3 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 13 21 310 8.7 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 13 22 308 8.5 -9 687.40 -38.2 -38.3 -38.2 77 -99 SPO 1997 04 06 13 23 308 8.6 -9 687.40 -38.2 -38.2 -38.2 77 -99 SPO 1997 04 06 13 24 306 9.1 -9 687.40 -38.1 -38.2 -38.2 77 -99 SPO 1997 04 06 13 25 307 9.3 -9 687.40 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 13 26 307 9.3 -9 687.40 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 13 27 308 9.1 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 13 28 307 9.1 -9 687.40 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 13 29 306 9.3 -9 687.40 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 30 306 9.1 -9 687.40 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 31 305 8.8 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 13 32 306 9.2 -9 687.40 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 33 306 8.8 -9 687.40 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 34 306 9.2 -9 687.40 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 13 35 306 9.1 -9 687.40 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 13 36 305 8.6 -9 687.40 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 13 37 305 9.5 -9 687.40 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 13 38 305 9.7 -9 687.40 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 13 39 304 9.6 -9 687.40 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 13 40 305 9.4 -9 687.40 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 13 41 305 9.0 -9 687.40 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 13 42 304 9.2 -9 687.40 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 43 304 9.4 -9 687.40 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 44 304 9.2 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 13 45 304 9.2 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 13 46 303 9.6 -9 687.50 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 13 47 304 9.4 -9 687.40 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 13 48 303 9.7 -9 687.40 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 13 49 303 9.2 -9 687.40 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 13 50 303 9.5 -9 687.40 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 13 51 304 9.4 -9 687.30 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 13 52 303 9.6 -9 687.30 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 13 53 304 9.3 -9 687.30 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 13 54 303 9.4 -9 687.30 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 13 55 303 9.6 -9 687.30 -38.0 -37.9 -38.0 76 -99 SPO 1997 04 06 13 56 304 9.1 -9 687.30 -37.9 -37.9 -38.0 75 -99 SPO 1997 04 06 13 57 304 8.9 -9 687.30 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 13 58 305 8.9 -9 687.30 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 13 59 306 8.9 -9 687.30 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 14 00 307 9.0 -9 687.30 -38.0 -38.0 -38.1 77 0 SPO 1997 04 06 14 01 307 9.2 -9 687.30 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 14 02 307 9.4 -9 687.30 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 14 03 308 9.1 -9 687.20 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 14 04 308 9.4 -9 687.30 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 14 05 308 9.0 -9 687.20 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 14 06 309 9.0 -9 687.20 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 14 07 307 8.9 -9 687.30 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 14 08 308 8.7 -9 687.30 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 14 09 309 9.3 -9 687.30 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 14 10 310 8.8 -9 687.20 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 14 11 311 8.7 -9 687.30 -37.9 -38.1 -38.0 77 -99 SPO 1997 04 06 14 12 311 8.6 -9 687.30 -37.9 -38.1 -38.0 77 -99 SPO 1997 04 06 14 13 310 8.5 -9 687.30 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 14 14 312 8.2 -9 687.40 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 14 15 313 8.3 -9 687.40 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 14 16 312 8.5 -9 687.40 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 14 17 312 8.2 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 14 18 311 8.2 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 14 19 311 7.9 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 14 20 313 7.7 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 14 21 315 7.5 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 14 22 314 7.6 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 23 315 7.8 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 24 315 8.2 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 25 317 8.1 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 26 317 8.1 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 27 317 7.8 -9 687.30 -38.0 -38.1 -38.1 74 -99 SPO 1997 04 06 14 28 318 7.6 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 29 317 7.5 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 30 317 8.2 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 31 316 7.5 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 32 316 7.8 -9 687.30 -38.0 -38.2 -38.1 77 -99 SPO 1997 04 06 14 33 315 7.5 -9 687.20 -38.0 -38.2 -38.1 77 -99 SPO 1997 04 06 14 34 314 8.2 -9 687.20 -38.1 -38.2 -38.1 78 -99 SPO 1997 04 06 14 35 314 8.0 -9 687.20 -38.1 -38.2 -38.1 78 -99 SPO 1997 04 06 14 36 314 8.2 -9 687.30 -38.1 -38.2 -38.1 77 -99 SPO 1997 04 06 14 37 314 8.3 -9 687.20 -38.1 -38.2 -38.1 77 -99 SPO 1997 04 06 14 38 315 8.0 -9 687.30 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 14 39 315 7.5 -9 687.30 -38.1 -38.2 -38.1 77 -99 SPO 1997 04 06 14 40 316 7.5 -9 687.30 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 14 41 315 7.8 -9 687.30 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 14 42 315 7.3 -9 687.30 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 14 43 314 7.6 -9 687.40 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 14 44 315 7.3 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 45 313 7.2 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 14 46 313 7.3 -9 687.50 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 47 313 7.1 -9 687.50 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 14 48 311 7.2 -9 687.60 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 14 49 310 7.3 -9 687.60 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 14 50 308 6.9 -9 687.60 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 14 51 307 7.4 -9 687.60 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 14 52 308 6.9 -9 687.60 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 14 53 306 7.2 -9 687.60 -37.9 -37.9 -38.0 75 -99 SPO 1997 04 06 14 54 306 7.7 -9 687.60 -37.9 -37.9 -37.9 75 -99 SPO 1997 04 06 14 55 306 7.5 -9 687.60 -37.9 -38.0 -37.9 75 -99 SPO 1997 04 06 14 56 309 7.4 -9 687.50 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 14 57 309 7.3 -9 687.50 -37.9 -38.1 -38.0 77 -99 SPO 1997 04 06 14 58 308 7.3 -9 687.50 -37.9 -38.1 -38.0 77 -99 SPO 1997 04 06 14 59 309 7.2 -9 687.50 -37.9 -38.1 -38.0 77 -99 SPO 1997 04 06 15 00 309 7.5 -9 687.60 -37.9 -38.1 -38.0 77 0 SPO 1997 04 06 15 01 310 7.1 -9 687.60 -37.9 -38.1 -38.0 77 -99 SPO 1997 04 06 15 02 310 6.9 -9 687.60 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 15 03 310 7.4 -9 687.60 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 04 310 7.5 -9 687.60 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 15 05 310 7.3 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 06 312 7.4 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 07 312 7.3 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 08 312 7.4 -9 687.50 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 09 312 7.2 -9 687.50 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 10 313 7.2 -9 687.60 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 11 311 7.3 -9 687.60 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 12 312 7.2 -9 687.60 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 13 312 7.3 -9 687.60 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 15 14 311 7.1 -9 687.60 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 15 15 311 6.8 -9 687.60 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 15 16 311 6.8 -9 687.60 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 15 17 311 7.4 -9 687.60 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 15 18 313 7.0 -9 687.50 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 15 19 313 6.6 -9 687.50 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 15 20 312 6.7 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 21 311 7.1 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 22 309 6.9 -9 687.50 -38.0 -38.1 -38.0 77 -99 SPO 1997 04 06 15 23 309 7.2 -9 687.50 -38.1 -38.1 -38.0 78 -99 SPO 1997 04 06 15 24 308 7.8 -9 687.40 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 15 25 307 8.0 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 26 308 7.7 -9 687.40 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 15 27 310 7.4 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 28 309 8.0 -9 687.40 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 15 29 311 7.3 -9 687.40 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 30 311 7.8 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 31 311 7.8 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 32 313 7.5 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 33 313 7.7 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 34 315 7.5 -9 687.50 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 15 35 317 7.2 -9 687.50 -38.1 -38.2 -38.2 78 -99 SPO 1997 04 06 15 36 317 7.7 -9 687.50 -38.1 -38.2 -38.2 78 -99 SPO 1997 04 06 15 37 316 7.4 -9 687.50 -38.1 -38.1 -38.1 78 -99 SPO 1997 04 06 15 38 316 7.9 -9 687.50 -38.1 -38.1 -38.1 78 -99 SPO 1997 04 06 15 39 316 7.4 -9 687.50 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 15 40 317 7.6 -9 687.50 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 15 41 318 7.6 -9 687.50 -38.1 -38.1 -38.2 77 -99 SPO 1997 04 06 15 42 319 7.6 -9 687.40 -38.1 -38.2 -38.2 77 -99 SPO 1997 04 06 15 43 319 7.9 -9 687.40 -38.1 -38.2 -38.2 77 -99 SPO 1997 04 06 15 44 321 8.0 -9 687.40 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 15 45 321 7.8 -9 687.40 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 15 46 319 8.3 -9 687.30 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 15 47 319 8.1 -9 687.30 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 15 48 317 8.0 -9 687.30 -38.2 -38.4 -38.2 76 -99 SPO 1997 04 06 15 49 315 8.3 -9 687.30 -38.2 -38.4 -38.3 76 -99 SPO 1997 04 06 15 50 315 8.3 -9 687.30 -38.2 -38.4 -38.3 76 -99 SPO 1997 04 06 15 51 314 8.5 -9 687.30 -38.2 -38.4 -38.3 77 -99 SPO 1997 04 06 15 52 314 8.2 -9 687.30 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 15 53 315 8.4 -9 687.20 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 15 54 314 8.5 -9 687.20 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 15 55 314 8.2 -9 687.30 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 15 56 313 8.4 -9 687.30 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 15 57 312 8.0 -9 687.30 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 15 58 312 7.9 -9 687.30 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 15 59 314 8.0 -9 687.30 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 16 00 314 7.7 -9 687.40 -38.2 -38.3 -38.3 77 0 SPO 1997 04 06 16 01 314 8.0 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 16 02 314 7.6 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 16 03 315 7.8 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 16 04 315 7.4 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 16 05 314 7.5 -9 687.40 -38.2 -38.3 -38.3 77 -99 SPO 1997 04 06 16 06 314 7.6 -9 687.40 -38.3 -38.2 -38.3 78 -99 SPO 1997 04 06 16 07 314 7.3 -9 687.40 -38.3 -38.2 -38.3 77 -99 SPO 1997 04 06 16 08 313 7.3 -9 687.40 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 16 09 312 7.3 -9 687.50 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 16 10 312 7.5 -9 687.50 -38.3 -38.3 -38.3 77 -99 SPO 1997 04 06 16 11 312 7.2 -9 687.50 -38.3 -38.4 -38.3 77 -99 SPO 1997 04 06 16 12 312 7.5 -9 687.50 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 16 13 311 7.6 -9 687.50 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 16 14 310 7.6 -9 687.40 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 16 15 310 7.4 -9 687.40 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 16 16 310 8.1 -9 687.40 -38.3 -38.4 -38.3 78 -99 SPO 1997 04 06 16 17 308 7.7 -9 687.40 -38.2 -38.2 -38.3 77 -99 SPO 1997 04 06 16 18 306 7.8 -9 687.40 -38.3 -38.3 -38.3 78 -99 SPO 1997 04 06 16 19 307 7.7 -9 687.40 -38.3 -38.3 -38.3 78 -99 SPO 1997 04 06 16 20 307 8.2 -9 687.40 -38.3 -38.2 -38.3 77 -99 SPO 1997 04 06 16 21 307 8.0 -9 687.40 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 22 306 7.9 -9 687.40 -38.2 -38.2 -38.2 76 -99 SPO 1997 04 06 16 23 307 7.9 -9 687.40 -38.2 -38.2 -38.2 76 -99 SPO 1997 04 06 16 24 307 7.9 -9 687.40 -38.2 -38.2 -38.2 77 -99 SPO 1997 04 06 16 25 308 8.2 -9 687.30 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 26 308 7.9 -9 687.30 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 27 307 8.2 -9 687.30 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 28 307 7.9 -9 687.30 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 29 306 8.3 -9 687.30 -38.2 -38.2 -38.3 75 -99 SPO 1997 04 06 16 30 306 8.2 -9 687.30 -38.2 -38.2 -38.3 75 -99 SPO 1997 04 06 16 31 306 8.3 -9 687.30 -38.2 -38.2 -38.3 75 -99 SPO 1997 04 06 16 32 306 7.9 -9 687.30 -38.2 -38.2 -38.4 75 -99 SPO 1997 04 06 16 33 306 8.4 -9 687.30 -38.3 -38.3 -38.3 77 -99 SPO 1997 04 06 16 34 308 8.6 -9 687.30 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 16 35 312 7.9 -9 687.30 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 16 36 311 8.0 -9 687.30 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 16 37 309 7.4 -9 687.30 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 16 38 307 8.2 -9 687.40 -38.4 -38.5 -38.5 75 -99 SPO 1997 04 06 16 39 308 7.5 -9 687.30 -38.4 -38.5 -38.4 75 -99 SPO 1997 04 06 16 40 308 7.7 -9 687.30 -38.3 -38.4 -38.5 76 -99 SPO 1997 04 06 16 41 308 7.8 -9 687.30 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 16 42 308 7.5 -9 687.30 -38.4 -38.4 -38.4 76 -99 SPO 1997 04 06 16 43 309 7.6 -9 687.40 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 16 44 308 7.8 -9 687.40 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 16 45 307 7.8 -9 687.30 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 16 46 307 7.6 -9 687.30 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 16 47 307 7.6 -9 687.30 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 16 48 306 8.0 -9 687.30 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 16 49 306 7.9 -9 687.30 -38.4 -38.3 -38.4 76 -99 SPO 1997 04 06 16 50 305 8.3 -9 687.30 -38.4 -38.3 -38.4 76 -99 SPO 1997 04 06 16 51 304 8.2 -9 687.30 -38.3 -38.2 -38.4 74 -99 SPO 1997 04 06 16 52 301 8.8 -9 687.30 -38.3 -38.2 -38.3 74 -99 SPO 1997 04 06 16 53 302 8.6 -9 687.20 -38.3 -38.1 -38.3 76 -99 SPO 1997 04 06 16 54 302 8.8 -9 687.20 -38.2 -38.1 -38.2 75 -99 SPO 1997 04 06 16 55 302 8.1 -9 687.20 -38.2 -38.1 -38.2 75 -99 SPO 1997 04 06 16 56 303 8.2 -9 687.20 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 57 304 8.2 -9 687.20 -38.2 -38.2 -38.3 76 -99 SPO 1997 04 06 16 58 306 7.8 -9 687.20 -38.2 -38.4 -38.4 77 -99 SPO 1997 04 06 16 59 304 7.7 -9 687.20 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 17 00 304 8.0 -9 687.20 -38.3 -38.4 -38.4 77 0 SPO 1997 04 06 17 01 304 7.9 -9 687.20 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 17 02 303 7.8 -9 687.20 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 17 03 301 8.3 -9 687.20 -38.3 -38.4 -38.3 77 -99 SPO 1997 04 06 17 04 300 8.7 -9 687.20 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 17 05 302 8.2 -9 687.20 -38.2 -38.2 -38.2 75 -99 SPO 1997 04 06 17 06 303 7.7 -9 687.20 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 17 07 301 7.9 -9 687.20 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 17 08 303 7.5 -9 687.20 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 17 09 303 8.0 -9 687.20 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 17 10 306 8.2 -9 687.20 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 17 11 306 8.3 -9 687.20 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 17 12 309 7.6 -9 687.20 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 17 13 307 8.0 -9 687.20 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 17 14 307 7.8 -9 687.20 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 17 15 307 7.9 -9 687.20 -38.3 -38.3 -38.3 77 -99 SPO 1997 04 06 17 16 307 7.3 -9 687.20 -38.3 -38.3 -38.4 77 -99 SPO 1997 04 06 17 17 308 7.5 -9 687.20 -38.3 -38.3 -38.3 77 -99 SPO 1997 04 06 17 18 307 6.9 -9 687.20 -38.3 -38.3 -38.3 77 -99 SPO 1997 04 06 17 19 306 7.0 -9 687.20 -38.3 -38.3 -38.4 76 -99 SPO 1997 04 06 17 20 305 7.2 -9 687.20 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 17 21 305 7.0 -9 687.30 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 17 22 304 7.0 -9 687.30 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 17 23 304 7.2 -9 687.30 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 17 24 301 7.3 -9 687.30 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 17 25 300 7.1 -9 687.30 -38.2 -38.2 -38.1 76 -99 SPO 1997 04 06 17 26 300 7.9 -9 687.30 -38.2 -38.2 -38.1 77 -99 SPO 1997 04 06 17 27 302 7.2 -9 687.30 -38.1 -38.2 -38.1 75 -99 SPO 1997 04 06 17 28 304 7.1 -9 687.30 -38.1 -38.2 -38.1 75 -99 SPO 1997 04 06 17 29 303 6.7 -9 687.30 -38.1 -38.2 -38.1 75 -99 SPO 1997 04 06 17 30 302 7.0 -9 687.30 -38.0 -38.2 -38.1 74 -99 SPO 1997 04 06 17 31 302 7.0 -9 687.20 -38.0 -38.2 -38.1 74 -99 SPO 1997 04 06 17 32 302 7.4 -9 687.20 -38.0 -38.1 -38.1 74 -99 SPO 1997 04 06 17 33 300 7.5 -9 687.30 -38.0 -38.1 -38.0 74 -99 SPO 1997 04 06 17 34 299 7.2 -9 687.20 -38.0 -38.1 -38.1 74 -99 SPO 1997 04 06 17 35 300 7.6 -9 687.20 -38.0 -38.1 -38.1 74 -99 SPO 1997 04 06 17 36 302 7.4 -9 687.20 -38.0 -38.1 -38.1 74 -99 SPO 1997 04 06 17 37 301 7.3 -9 687.20 -38.0 -38.1 -38.1 74 -99 SPO 1997 04 06 17 38 299 7.6 -9 687.20 -38.0 -38.0 -38.0 74 -99 SPO 1997 04 06 17 39 300 7.7 -9 687.30 -37.9 -38.0 -37.9 75 -99 SPO 1997 04 06 17 40 301 7.6 -9 687.30 -37.9 -38.0 -37.9 75 -99 SPO 1997 04 06 17 41 301 7.4 -9 687.30 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 17 42 302 7.4 -9 687.30 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 17 43 304 6.8 -9 687.30 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 17 44 302 6.7 -9 687.30 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 17 45 302 6.9 -9 687.30 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 17 46 303 6.9 -9 687.30 -37.9 -38.1 -38.0 75 -99 SPO 1997 04 06 17 47 301 6.9 -9 687.30 -37.9 -38.1 -38.0 75 -99 SPO 1997 04 06 17 48 301 7.2 -9 687.30 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 17 49 299 7.0 -9 687.30 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 17 50 300 6.8 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 17 51 299 7.3 -9 687.20 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 17 52 300 7.2 -9 687.30 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 17 53 298 7.3 -9 687.30 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 17 54 298 7.3 -9 687.30 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 17 55 298 7.1 -9 687.20 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 17 56 299 6.8 -9 687.20 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 17 57 298 7.1 -9 687.20 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 17 58 297 7.1 -9 687.20 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 17 59 298 7.4 -9 687.20 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 18 00 298 7.6 -9 687.20 -38.0 -38.1 -38.1 77 0 SPO 1997 04 06 18 01 301 7.5 -9 687.20 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 18 02 302 7.4 -9 687.20 -38.0 -38.1 -38.1 77 -99 SPO 1997 04 06 18 03 302 7.4 -9 687.20 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 18 04 301 7.7 -9 687.20 -38.1 -38.2 -38.2 77 -99 SPO 1997 04 06 18 05 302 7.7 -9 687.20 -38.1 -38.2 -38.2 75 -99 SPO 1997 04 06 18 06 302 8.0 -9 687.10 -38.1 -38.2 -38.2 74 -99 SPO 1997 04 06 18 07 301 8.0 -9 687.10 -38.2 -38.2 -38.3 75 -99 SPO 1997 04 06 18 08 301 7.9 -9 687.10 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 18 09 300 7.9 -9 687.10 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 18 10 299 7.8 -9 687.10 -38.2 -38.4 -38.4 75 -99 SPO 1997 04 06 18 11 298 7.9 -9 687.10 -38.2 -38.4 -38.4 75 -99 SPO 1997 04 06 18 12 298 7.9 -9 687.10 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 18 13 297 7.8 -9 687.10 -38.3 -38.4 -38.3 77 -99 SPO 1997 04 06 18 14 298 8.1 -9 687.00 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 18 15 299 7.6 -9 687.00 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 18 16 299 8.2 -9 687.00 -38.3 -38.5 -38.4 76 -99 SPO 1997 04 06 18 17 299 8.4 -9 687.00 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 18 18 297 8.3 -9 687.00 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 18 19 300 8.7 -9 687.00 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 20 299 8.6 -9 687.00 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 21 298 8.6 -9 687.00 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 22 297 8.9 -9 687.00 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 18 23 298 8.8 -9 686.90 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 18 24 299 8.7 -9 686.90 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 18 25 299 8.7 -9 686.90 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 18 26 301 8.3 -9 686.90 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 18 27 301 8.3 -9 686.90 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 28 302 8.0 -9 686.90 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 29 303 8.0 -9 686.90 -38.4 -38.4 -38.4 75 -99 SPO 1997 04 06 18 30 303 8.2 -9 686.90 -38.4 -38.5 -38.4 76 -99 SPO 1997 04 06 18 31 302 8.2 -9 686.90 -38.4 -38.4 -38.5 76 -99 SPO 1997 04 06 18 32 303 8.0 -9 686.90 -38.4 -38.4 -38.5 75 -99 SPO 1997 04 06 18 33 301 8.0 -9 686.90 -38.4 -38.5 -38.5 75 -99 SPO 1997 04 06 18 34 301 8.3 -9 686.90 -38.4 -38.5 -38.4 75 -99 SPO 1997 04 06 18 35 301 8.0 -9 686.80 -38.4 -38.5 -38.4 75 -99 SPO 1997 04 06 18 36 300 8.5 -9 686.80 -38.4 -38.6 -38.5 75 -99 SPO 1997 04 06 18 37 300 8.8 -9 686.80 -38.4 -38.6 -38.4 76 -99 SPO 1997 04 06 18 38 299 8.2 -9 686.80 -38.4 -38.5 -38.4 76 -99 SPO 1997 04 06 18 39 298 8.7 -9 686.80 -38.4 -38.5 -38.4 75 -99 SPO 1997 04 06 18 40 298 8.3 -9 686.80 -38.4 -38.5 -38.4 75 -99 SPO 1997 04 06 18 41 300 8.5 -9 686.80 -38.4 -38.5 -38.4 75 -99 SPO 1997 04 06 18 42 300 8.8 -9 686.80 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 43 297 8.9 -9 686.80 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 44 299 8.8 -9 686.70 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 45 298 8.3 -9 686.70 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 46 298 8.4 -9 686.70 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 18 47 298 8.7 -9 686.70 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 18 48 297 8.4 -9 686.70 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 18 49 297 8.6 -9 686.70 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 18 50 297 8.7 -9 686.70 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 51 297 8.4 -9 686.70 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 52 296 8.6 -9 686.70 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 18 53 296 8.8 -9 686.70 -38.3 -38.4 -38.3 74 -99 SPO 1997 04 06 18 54 297 8.8 -9 686.60 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 18 55 295 8.6 -9 686.60 -38.3 -38.3 -38.3 76 -99 SPO 1997 04 06 18 56 295 8.7 -9 686.60 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 18 57 295 9.1 -9 686.60 -38.2 -38.3 -38.3 73 -99 SPO 1997 04 06 18 58 296 9.0 -9 686.60 -38.2 -38.4 -38.3 73 -99 SPO 1997 04 06 18 59 296 8.8 -9 686.60 -38.2 -38.4 -38.2 73 -99 SPO 1997 04 06 19 00 296 8.9 -9 686.60 -38.2 -38.4 -38.3 75 0 SPO 1997 04 06 19 01 296 8.8 -9 686.60 -38.2 -38.4 -38.2 75 -99 SPO 1997 04 06 19 02 295 9.0 -9 686.60 -38.2 -38.4 -38.2 75 -99 SPO 1997 04 06 19 03 295 8.9 -9 686.50 -38.1 -38.3 -38.2 74 -99 SPO 1997 04 06 19 04 294 9.4 -9 686.50 -38.2 -38.2 -38.2 73 -99 SPO 1997 04 06 19 05 295 9.1 -9 686.50 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 19 06 296 8.9 -9 686.50 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 19 07 295 9.5 -9 686.60 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 08 295 8.7 -9 686.50 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 09 295 9.3 -9 686.60 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 10 292 9.3 -9 686.60 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 11 291 8.9 -9 686.60 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 12 293 8.9 -9 686.60 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 19 13 294 8.6 -9 686.70 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 19 14 294 8.9 -9 686.70 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 19 15 292 9.0 -9 686.70 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 16 296 8.5 -9 686.70 -38.1 -38.3 -38.2 74 -99 SPO 1997 04 06 19 17 296 8.6 -9 686.70 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 19 18 296 8.5 -9 686.70 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 19 19 296 8.3 -9 686.60 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 19 20 297 8.2 -9 686.60 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 21 297 8.6 -9 686.60 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 19 22 296 8.9 -9 686.60 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 19 23 296 8.8 -9 686.60 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 19 24 295 8.6 -9 686.60 -38.2 -38.4 -38.2 76 -99 SPO 1997 04 06 19 25 294 8.8 -9 686.70 -38.2 -38.4 -38.2 76 -99 SPO 1997 04 06 19 26 294 8.3 -9 686.60 -38.2 -38.4 -38.2 76 -99 SPO 1997 04 06 19 27 295 8.5 -9 686.60 -38.2 -38.4 -38.2 76 -99 SPO 1997 04 06 19 28 293 8.1 -9 686.60 -38.2 -38.4 -38.2 77 -99 SPO 1997 04 06 19 29 294 8.6 -9 686.60 -38.2 -38.4 -38.2 77 -99 SPO 1997 04 06 19 30 294 8.6 -9 686.60 -38.2 -38.3 -38.2 77 -99 SPO 1997 04 06 19 31 292 8.5 -9 686.60 -38.1 -38.3 -38.2 75 -99 SPO 1997 04 06 19 32 292 8.3 -9 686.60 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 19 33 291 8.6 -9 686.60 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 19 34 290 8.4 -9 686.60 -38.2 -38.3 -38.3 75 -99 SPO 1997 04 06 19 35 293 8.1 -9 686.60 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 36 294 8.7 -9 686.60 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 37 296 8.3 -9 686.60 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 38 295 8.5 -9 686.60 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 39 295 8.7 -9 686.60 -38.3 -38.3 -38.3 77 -99 SPO 1997 04 06 19 40 296 8.1 -9 686.70 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 19 41 296 8.3 -9 686.70 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 19 42 297 7.9 -9 686.70 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 19 43 296 7.8 -9 686.70 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 19 44 296 7.9 -9 686.70 -38.3 -38.4 -38.4 77 -99 SPO 1997 04 06 19 45 296 8.0 -9 686.70 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 19 46 298 7.8 -9 686.70 -38.3 -38.4 -38.4 74 -99 SPO 1997 04 06 19 47 296 7.7 -9 686.70 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 19 48 297 8.1 -9 686.70 -38.3 -38.5 -38.4 74 -99 SPO 1997 04 06 19 49 296 8.3 -9 686.70 -38.4 -38.5 -38.4 76 -99 SPO 1997 04 06 19 50 294 8.2 -9 686.70 -38.3 -38.5 -38.4 76 -99 SPO 1997 04 06 19 51 295 8.2 -9 686.70 -38.3 -38.5 -38.4 76 -99 SPO 1997 04 06 19 52 294 7.9 -9 686.70 -38.3 -38.4 -38.4 76 -99 SPO 1997 04 06 19 53 294 8.1 -9 686.70 -38.3 -38.4 -38.3 77 -99 SPO 1997 04 06 19 54 293 7.6 -9 686.70 -38.3 -38.4 -38.3 77 -99 SPO 1997 04 06 19 55 293 8.0 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 56 293 8.2 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 57 292 7.9 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 58 292 7.8 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 19 59 292 7.5 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 20 00 292 7.7 -9 686.70 -38.2 -38.3 -38.2 75 0 SPO 1997 04 06 20 01 293 7.5 -9 686.70 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 20 02 293 7.9 -9 686.70 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 20 03 295 7.7 -9 686.70 -38.2 -38.3 -38.2 75 -99 SPO 1997 04 06 20 04 296 7.3 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 20 05 296 7.3 -9 686.70 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 20 06 297 7.4 -9 686.70 -38.2 -38.3 -38.3 76 -99 SPO 1997 04 06 20 07 297 7.3 -9 686.70 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 20 08 297 7.5 -9 686.60 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 20 09 298 7.6 -9 686.70 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 20 10 297 7.4 -9 686.70 -38.2 -38.3 -38.2 76 -99 SPO 1997 04 06 20 11 297 7.2 -9 686.80 -38.2 -38.3 -38.2 77 -99 SPO 1997 04 06 20 12 296 6.8 -9 686.80 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 20 13 296 7.0 -9 686.80 -38.1 -38.3 -38.2 77 -99 SPO 1997 04 06 20 14 295 6.8 -9 686.80 -38.1 -38.2 -38.1 77 -99 SPO 1997 04 06 20 15 294 7.3 -9 686.80 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 20 16 297 6.9 -9 686.80 -38.0 -38.2 -38.1 76 -99 SPO 1997 04 06 20 17 292 7.9 -9 686.80 -38.0 -38.2 -38.0 76 -99 SPO 1997 04 06 20 18 294 7.2 -9 686.80 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 20 19 292 7.0 -9 686.80 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 20 20 293 7.0 -9 686.80 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 20 21 294 7.1 -9 686.80 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 20 22 295 7.3 -9 686.80 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 20 23 294 7.2 -9 686.80 -37.9 -38.1 -38.0 75 -99 SPO 1997 04 06 20 24 294 7.5 -9 686.80 -37.9 -38.1 -38.0 75 -99 SPO 1997 04 06 20 25 293 7.9 -9 686.80 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 20 26 292 7.0 -9 686.80 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 20 27 291 7.3 -9 686.80 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 20 28 293 7.2 -9 686.70 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 20 29 291 7.5 -9 686.70 -37.9 -38.0 -37.9 77 -99 SPO 1997 04 06 20 30 289 7.2 -9 686.70 -37.9 -37.9 -37.9 77 -99 SPO 1997 04 06 20 31 290 7.1 -9 686.70 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 20 32 291 7.5 -9 686.70 -37.8 -37.9 -37.8 74 -99 SPO 1997 04 06 20 33 290 7.2 -9 686.70 -37.8 -37.9 -37.8 74 -99 SPO 1997 04 06 20 34 291 7.2 -9 686.70 -37.8 -37.9 -37.8 74 -99 SPO 1997 04 06 20 35 291 7.7 -9 686.70 -37.8 -37.9 -37.8 74 -99 SPO 1997 04 06 20 36 291 7.0 -9 686.70 -37.8 -37.9 -37.8 74 -99 SPO 1997 04 06 20 37 291 7.2 -9 686.70 -37.8 -38.0 -37.8 76 -99 SPO 1997 04 06 20 38 291 7.6 -9 686.70 -37.8 -38.0 -37.9 76 -99 SPO 1997 04 06 20 39 291 7.2 -9 686.70 -37.8 -38.0 -37.8 76 -99 SPO 1997 04 06 20 40 292 7.2 -9 686.70 -37.8 -38.0 -37.9 76 -99 SPO 1997 04 06 20 41 293 7.3 -9 686.70 -37.8 -38.0 -37.9 76 -99 SPO 1997 04 06 20 42 292 7.2 -9 686.70 -37.8 -38.0 -37.9 76 -99 SPO 1997 04 06 20 43 295 7.4 -9 686.70 -37.8 -38.0 -37.9 76 -99 SPO 1997 04 06 20 44 294 7.2 -9 686.70 -37.8 -38.0 -37.9 74 -99 SPO 1997 04 06 20 45 295 7.0 -9 686.70 -37.8 -38.0 -37.9 74 -99 SPO 1997 04 06 20 46 297 7.1 -9 686.70 -37.9 -37.9 -37.9 73 -99 SPO 1997 04 06 20 47 295 7.2 -9 686.70 -37.8 -37.9 -37.9 73 -99 SPO 1997 04 06 20 48 296 7.4 -9 686.70 -37.8 -37.9 -37.9 74 -99 SPO 1997 04 06 20 49 295 7.1 -9 686.70 -37.8 -37.9 -37.9 74 -99 SPO 1997 04 06 20 50 296 7.0 -9 686.60 -37.9 -37.9 -37.9 77 -99 SPO 1997 04 06 20 51 298 7.3 -9 686.60 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 20 52 300 7.1 -9 686.60 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 20 53 301 7.0 -9 686.50 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 20 54 303 7.1 -9 686.60 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 20 55 305 6.6 -9 686.50 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 20 56 306 6.8 -9 686.50 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 20 57 307 6.9 -9 686.50 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 20 58 308 7.2 -9 686.50 -37.8 -37.8 -37.9 77 -99 SPO 1997 04 06 20 59 310 6.8 -9 686.40 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 21 00 306 7.0 -9 686.40 -37.8 -37.8 -37.9 74 0 SPO 1997 04 06 21 01 305 6.6 -9 686.40 -37.8 -37.9 -37.9 74 -99 SPO 1997 04 06 21 02 302 6.2 -9 686.50 -37.8 -38.0 -37.9 74 -99 SPO 1997 04 06 21 03 304 6.5 -9 686.50 -37.8 -38.0 -37.9 76 -99 SPO 1997 04 06 21 04 304 6.4 -9 686.50 -37.9 -38.0 -37.9 77 -99 SPO 1997 04 06 21 05 304 6.3 -9 686.50 -37.9 -38.0 -37.9 77 -99 SPO 1997 04 06 21 06 303 6.5 -9 686.50 -37.9 -38.0 -37.9 77 -99 SPO 1997 04 06 21 07 303 6.6 -9 686.50 -37.9 -38.0 -37.9 77 -99 SPO 1997 04 06 21 08 304 6.8 -9 686.50 -37.9 -38.0 -37.9 77 -99 SPO 1997 04 06 21 09 308 6.5 -9 686.50 -37.9 -37.9 -37.9 77 -99 SPO 1997 04 06 21 10 307 6.8 -9 686.40 -37.9 -37.9 -37.9 77 -99 SPO 1997 04 06 21 11 306 6.5 -9 686.40 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 12 305 6.4 -9 686.40 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 13 305 6.7 -9 686.40 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 14 304 7.2 -9 686.30 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 15 304 7.3 -9 686.30 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 21 16 304 7.2 -9 686.30 -37.8 -37.8 -37.9 74 -99 SPO 1997 04 06 21 17 302 7.5 -9 686.30 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 21 18 305 7.2 -9 686.30 -37.8 -37.8 -37.8 76 -99 SPO 1997 04 06 21 19 305 7.5 -9 686.30 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 21 20 304 7.6 -9 686.40 -37.8 -37.8 -37.9 76 -99 SPO 1997 04 06 21 21 304 7.5 -9 686.40 -37.8 -37.8 -37.8 76 -99 SPO 1997 04 06 21 22 305 7.3 -9 686.40 -37.8 -37.8 -37.8 77 -99 SPO 1997 04 06 21 23 306 7.2 -9 686.40 -37.8 -37.8 -37.8 77 -99 SPO 1997 04 06 21 24 306 7.5 -9 686.40 -37.8 -37.8 -37.8 77 -99 SPO 1997 04 06 21 25 304 7.4 -9 686.40 -37.8 -37.8 -37.8 76 -99 SPO 1997 04 06 21 26 305 7.4 -9 686.40 -37.8 -37.9 -37.8 76 -99 SPO 1997 04 06 21 27 304 7.4 -9 686.30 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 28 306 7.1 -9 686.30 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 29 305 7.2 -9 686.40 -37.8 -37.9 -37.9 76 -99 SPO 1997 04 06 21 30 305 7.4 -9 686.30 -37.8 -37.9 -37.9 74 -99 SPO 1997 04 06 21 31 305 7.1 -9 686.30 -37.8 -37.9 -37.9 74 -99 SPO 1997 04 06 21 32 306 7.3 -9 686.40 -37.9 -37.9 -37.9 75 -99 SPO 1997 04 06 21 33 304 7.2 -9 686.40 -37.9 -37.9 -38.0 75 -99 SPO 1997 04 06 21 34 303 7.2 -9 686.40 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 21 35 305 7.5 -9 686.30 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 21 36 307 7.4 -9 686.30 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 21 37 309 7.6 -9 686.30 -37.9 -37.9 -38.0 75 -99 SPO 1997 04 06 21 38 308 7.4 -9 686.30 -38.0 -37.9 -38.0 76 -99 SPO 1997 04 06 21 39 307 7.5 -9 686.30 -37.9 -38.0 -38.0 77 -99 SPO 1997 04 06 21 40 307 7.4 -9 686.30 -38.0 -38.0 -38.0 77 -99 SPO 1997 04 06 21 41 306 7.2 -9 686.30 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 21 42 306 6.8 -9 686.40 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 21 43 307 7.3 -9 686.40 -38.0 -38.0 -38.1 77 -99 SPO 1997 04 06 21 44 307 7.6 -9 686.30 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 21 45 306 7.6 -9 686.30 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 21 46 305 7.5 -9 686.30 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 21 47 306 7.5 -9 686.30 -38.1 -38.0 -38.1 75 -99 SPO 1997 04 06 21 48 306 7.5 -9 686.30 -38.1 -38.0 -38.1 75 -99 SPO 1997 04 06 21 49 307 7.5 -9 686.20 -38.1 -37.9 -38.1 77 -99 SPO 1997 04 06 21 50 308 7.5 -9 686.20 -38.1 -38.0 -38.1 78 -99 SPO 1997 04 06 21 51 308 7.5 -9 686.20 -38.1 -38.0 -38.1 77 -99 SPO 1997 04 06 21 52 311 7.3 -9 686.20 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 21 53 315 7.5 -9 686.10 -38.1 -38.1 -38.2 77 -99 SPO 1997 04 06 21 54 315 7.4 -9 686.10 -38.2 -38.1 -38.2 76 -99 SPO 1997 04 06 21 55 316 7.2 -9 686.10 -38.2 -38.1 -38.2 76 -99 SPO 1997 04 06 21 56 316 7.6 -9 686.00 -38.2 -38.1 -38.2 76 -99 SPO 1997 04 06 21 57 315 7.6 -9 686.10 -38.2 -38.1 -38.2 76 -99 SPO 1997 04 06 21 58 314 7.7 -9 686.10 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 21 59 314 8.0 -9 686.10 -38.1 -38.0 -38.1 77 -99 SPO 1997 04 06 22 00 313 7.8 -9 686.10 -38.0 -38.0 -38.1 74 0 SPO 1997 04 06 22 01 312 7.7 -9 686.10 -38.1 -38.0 -38.1 75 -99 SPO 1997 04 06 22 02 311 7.5 -9 686.10 -38.1 -38.0 -38.1 75 -99 SPO 1997 04 06 22 03 308 7.7 -9 686.10 -38.0 -38.0 -38.1 74 -99 SPO 1997 04 06 22 04 306 8.2 -9 686.00 -38.0 -37.9 -38.0 74 -99 SPO 1997 04 06 22 05 306 8.2 -9 686.00 -38.0 -37.8 -38.0 76 -99 SPO 1997 04 06 22 06 303 8.4 -9 686.10 -37.9 -37.8 -38.0 75 -99 SPO 1997 04 06 22 07 303 8.1 -9 686.10 -37.9 -37.8 -38.0 75 -99 SPO 1997 04 06 22 08 303 8.3 -9 686.10 -37.9 -37.8 -38.0 75 -99 SPO 1997 04 06 22 09 306 8.3 -9 686.10 -37.9 -37.8 -37.9 77 -99 SPO 1997 04 06 22 10 308 8.1 -9 686.10 -37.9 -37.9 -37.9 77 -99 SPO 1997 04 06 22 11 309 8.2 -9 686.10 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 22 12 311 7.7 -9 686.10 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 22 13 310 7.0 -9 686.10 -37.9 -37.9 -38.0 77 -99 SPO 1997 04 06 22 14 311 7.3 -9 686.10 -37.9 -37.9 -38.0 75 -99 SPO 1997 04 06 22 15 313 7.4 -9 686.10 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 22 16 315 7.5 -9 686.00 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 22 17 317 7.7 -9 686.00 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 22 18 317 7.3 -9 686.00 -38.0 -38.1 -38.0 76 -99 SPO 1997 04 06 22 19 316 7.3 -9 686.00 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 22 20 318 7.4 -9 686.00 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 22 21 320 7.4 -9 686.00 -38.0 -38.1 -38.1 76 -99 SPO 1997 04 06 22 22 323 7.8 -9 685.90 -38.1 -38.1 -38.1 77 -99 SPO 1997 04 06 22 23 320 7.5 -9 685.90 -38.1 -38.1 -38.1 78 -99 SPO 1997 04 06 22 24 317 7.4 -9 686.00 -38.1 -38.0 -38.1 77 -99 SPO 1997 04 06 22 25 314 7.1 -9 686.10 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 22 26 314 7.0 -9 686.10 -38.0 -38.0 -38.1 76 -99 SPO 1997 04 06 22 27 315 7.2 -9 686.10 -38.0 -38.0 -38.0 76 -99 SPO 1997 04 06 22 28 317 7.0 -9 686.10 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 22 29 319 6.9 -9 686.10 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 22 30 320 6.9 -9 686.10 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 22 31 321 6.5 -9 686.10 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 22 32 321 6.7 -9 686.10 -37.9 -38.0 -38.0 75 -99 SPO 1997 04 06 22 33 321 6.8 -9 686.10 -37.9 -38.0 -38.1 77 -99 SPO 1997 04 06 22 34 320 6.8 -9 686.10 -38.0 -38.0 -38.0 -99 -99 SPO 1997 04 06 22 35 321 6.2 -9 686.10 -37.9 -38.0 -38.0 -99 -99 SPO 1997 04 06 22 36 321 6.3 -9 686.10 -37.9 -38.0 -38.0 -99 -99 SPO 1997 04 06 22 37 325 6.4 -9 686.10 -38.0 -38.0 -38.0 -99 -99 SPO 1997 04 06 22 38 323 6.6 -9 686.10 -38.0 -38.0 -38.0 -99 -99 SPO 1997 04 06 22 39 325 6.6 -9 686.10 -37.9 -38.0 -38.0 -99 -99 SPO 1997 04 06 22 40 325 7.1 -9 686.10 -37.9 -38.1 -38.0 -99 -99 SPO 1997 04 06 22 41 325 7.1 -9 686.00 -37.8 -38.1 -37.9 74 -99 SPO 1997 04 06 22 42 322 6.9 -9 686.00 -37.9 -38.0 -37.9 75 -99 SPO 1997 04 06 22 43 318 6.7 -9 686.10 -37.9 -38.0 -37.9 75 -99 SPO 1997 04 06 22 44 317 6.7 -9 686.10 -37.8 -38.0 -37.9 73 -99 SPO 1997 04 06 22 45 317 7.1 -9 686.10 -37.8 -37.9 -37.9 73 -99 SPO 1997 04 06 22 46 316 6.9 -9 686.10 -37.8 -38.0 -37.8 73 -99 SPO 1997 04 06 22 47 315 6.7 -9 686.10 -37.8 -38.0 -37.8 73 -99 SPO 1997 04 06 22 48 315 6.4 -9 686.20 -37.8 -38.0 -37.8 73 -99 SPO 1997 04 06 22 49 315 6.5 -9 686.10 -37.8 -37.9 -37.8 73 -99 SPO 1997 04 06 22 50 315 6.6 -9 686.10 -37.7 -37.9 -37.8 72 -99 SPO 1997 04 06 22 51 318 6.5 -9 686.10 -37.7 -37.9 -37.8 72 -99 SPO 1997 04 06 22 52 318 6.6 -9 686.10 -37.7 -37.9 -37.8 73 -99 SPO 1997 04 06 22 53 313 6.6 -9 686.10 -37.7 -37.9 -37.8 73 -99 SPO 1997 04 06 22 54 312 6.3 -9 686.10 -37.7 -37.9 -37.8 73 -99 SPO 1997 04 06 22 55 310 6.6 -9 686.20 -37.7 -37.8 -37.8 73 -99 SPO 1997 04 06 22 56 311 6.3 -9 686.20 -37.7 -37.8 -37.7 73 -99 SPO 1997 04 06 22 57 311 6.7 -9 686.10 -37.7 -37.8 -37.8 73 -99 SPO 1997 04 06 22 58 313 7.0 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 22 59 314 7.0 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 00 313 6.5 -9 686.10 -37.6 -37.8 -37.7 71 0 SPO 1997 04 06 23 01 315 6.5 -9 686.10 -37.6 -37.8 -37.7 71 -99 SPO 1997 04 06 23 02 313 6.6 -9 686.10 -37.7 -37.8 -37.7 72 -99 SPO 1997 04 06 23 03 311 7.0 -9 686.10 -37.7 -37.8 -37.7 73 -99 SPO 1997 04 06 23 04 314 6.6 -9 686.10 -37.7 -37.9 -37.7 73 -99 SPO 1997 04 06 23 05 313 6.4 -9 686.10 -37.6 -37.9 -37.7 73 -99 SPO 1997 04 06 23 06 311 6.4 -9 686.10 -37.7 -37.9 -37.7 73 -99 SPO 1997 04 06 23 07 311 6.6 -9 686.10 -37.7 -37.9 -37.7 73 -99 SPO 1997 04 06 23 08 310 6.7 -9 686.10 -37.6 -37.9 -37.7 73 -99 SPO 1997 04 06 23 09 310 6.8 -9 686.10 -37.6 -37.9 -37.7 73 -99 SPO 1997 04 06 23 10 311 6.5 -9 686.10 -37.6 -37.9 -37.7 74 -99 SPO 1997 04 06 23 11 311 6.3 -9 686.10 -37.6 -37.9 -37.7 73 -99 SPO 1997 04 06 23 12 313 6.2 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 13 316 6.5 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 14 316 6.5 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 15 317 6.4 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 16 317 6.6 -9 686.10 -37.5 -37.8 -37.7 72 -99 SPO 1997 04 06 23 17 317 6.5 -9 686.10 -37.5 -37.8 -37.7 72 -99 SPO 1997 04 06 23 18 317 6.5 -9 686.10 -37.5 -37.8 -37.6 72 -99 SPO 1997 04 06 23 19 318 6.3 -9 686.10 -37.5 -37.8 -37.6 74 -99 SPO 1997 04 06 23 20 317 6.3 -9 686.10 -37.5 -37.8 -37.6 74 -99 SPO 1997 04 06 23 21 318 6.4 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 22 318 6.5 -9 686.10 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 06 23 23 318 6.4 -9 686.10 -37.6 -37.8 -37.7 74 -99 SPO 1997 04 06 23 24 317 6.9 -9 686.10 -37.6 -37.7 -37.7 74 -99 SPO 1997 04 06 23 25 316 6.8 -9 686.10 -37.6 -37.7 -37.6 74 -99 SPO 1997 04 06 23 26 318 6.6 -9 686.00 -37.5 -37.6 -37.6 74 -99 SPO 1997 04 06 23 27 317 7.0 -9 686.00 -37.5 -37.6 -37.6 74 -99 SPO 1997 04 06 23 28 318 6.9 -9 686.00 -37.5 -37.6 -37.5 74 -99 SPO 1997 04 06 23 29 317 7.2 -9 686.00 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 06 23 30 315 7.1 -9 686.00 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 06 23 31 314 6.7 -9 686.00 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 06 23 32 314 6.4 -9 686.00 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 06 23 33 313 6.5 -9 686.00 -37.4 -37.6 -37.4 74 -99 SPO 1997 04 06 23 34 314 6.8 -9 686.00 -37.4 -37.6 -37.4 74 -99 SPO 1997 04 06 23 35 314 6.9 -9 686.10 -37.4 -37.6 -37.5 74 -99 SPO 1997 04 06 23 36 313 6.8 -9 686.10 -37.4 -37.7 -37.5 74 -99 SPO 1997 04 06 23 37 315 6.8 -9 686.00 -37.4 -37.7 -37.5 74 -99 SPO 1997 04 06 23 38 315 7.2 -9 686.00 -37.5 -37.7 -37.5 74 -99 SPO 1997 04 06 23 39 314 7.0 -9 686.00 -37.5 -37.6 -37.5 76 -99 SPO 1997 04 06 23 40 315 7.0 -9 686.00 -37.5 -37.6 -37.5 76 -99 SPO 1997 04 06 23 41 313 7.3 -9 686.00 -37.4 -37.6 -37.5 74 -99 SPO 1997 04 06 23 42 312 7.4 -9 686.00 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 43 311 7.2 -9 686.00 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 44 311 7.4 -9 686.00 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 45 312 7.1 -9 686.00 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 46 311 7.4 -9 686.00 -37.4 -37.5 -37.4 73 -99 SPO 1997 04 06 23 47 313 7.3 -9 686.00 -37.4 -37.5 -37.4 73 -99 SPO 1997 04 06 23 48 315 7.1 -9 686.00 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 06 23 49 315 7.8 -9 686.00 -37.4 -37.6 -37.5 74 -99 SPO 1997 04 06 23 50 316 7.8 -9 685.90 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 51 317 7.7 -9 685.90 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 52 318 7.3 -9 685.90 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 53 315 7.2 -9 685.90 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 54 317 7.0 -9 685.90 -37.4 -37.6 -37.5 73 -99 SPO 1997 04 06 23 55 320 7.2 -9 685.90 -37.4 -37.7 -37.5 73 -99 SPO 1997 04 06 23 56 319 7.0 -9 685.90 -37.5 -37.7 -37.5 74 -99 SPO 1997 04 06 23 57 316 6.5 -9 686.10 -37.5 -37.8 -37.5 -99 -99 SPO 1997 04 06 23 58 315 7.0 -9 686.10 -37.5 -37.8 -37.6 -99 -99 SPO 1997 04 06 23 59 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 07 00 00 313 7.7 -9 686.00 -37.5 -37.8 -37.6 -99 0 SPO 1997 04 07 00 01 312 7.3 -9 686.00 -37.5 -37.8 -37.6 -99 -99 SPO 1997 04 07 00 02 310 7.2 -9 686.00 -37.5 -37.7 -37.5 -99 -99 SPO 1997 04 07 00 03 309 7.4 -9 685.90 -37.5 -37.7 -37.5 -99 -99 SPO 1997 04 07 00 04 313 7.2 -9 685.90 -37.4 -37.6 -37.4 -99 -99 SPO 1997 04 07 00 05 314 7.0 -9 685.90 -37.4 -37.6 -37.4 -99 -99 SPO 1997 04 07 00 06 315 7.2 -9 685.90 -37.4 -37.6 -37.4 -99 -99 SPO 1997 04 07 00 07 314 7.0 -9 685.90 -37.3 -37.6 -37.4 -99 -99 SPO 1997 04 07 00 08 312 7.0 -9 685.90 -37.4 -37.6 -37.5 -99 -99 SPO 1997 04 07 00 09 313 7.2 -9 686.00 -37.4 -37.6 -37.5 -99 -99 SPO 1997 04 07 00 10 312 6.8 -9 685.90 -37.4 -37.6 -37.5 -99 -99 SPO 1997 04 07 00 11 313 6.5 -9 685.90 -37.4 -37.7 -37.5 -99 -99 SPO 1997 04 07 00 12 313 6.9 -9 685.90 -37.4 -37.7 -37.6 -99 -99 SPO 1997 04 07 00 13 314 7.2 -9 685.90 -37.5 -37.7 -37.6 73 -99 SPO 1997 04 07 00 14 313 7.3 -9 685.90 -37.5 -37.7 -37.6 72 -99 SPO 1997 04 07 00 15 312 7.3 -9 685.90 -37.5 -37.7 -37.6 71 -99 SPO 1997 04 07 00 16 311 7.4 -9 685.90 -37.5 -37.7 -37.6 71 -99 SPO 1997 04 07 00 17 312 7.7 -9 685.90 -37.5 -37.7 -37.6 72 -99 SPO 1997 04 07 00 18 312 7.7 -9 685.80 -37.5 -37.7 -37.6 73 -99 SPO 1997 04 07 00 19 312 7.8 -9 685.80 -37.5 -37.8 -37.6 73 -99 SPO 1997 04 07 00 20 311 7.8 -9 685.80 -37.4 -37.8 -37.6 73 -99 SPO 1997 04 07 00 21 310 7.9 -9 685.80 -37.5 -37.8 -37.6 74 -99 SPO 1997 04 07 00 22 310 7.8 -9 685.80 -37.5 -37.8 -37.5 74 -99 SPO 1997 04 07 00 23 312 7.7 -9 685.80 -37.5 -37.8 -37.5 73 -99 SPO 1997 04 07 00 24 310 7.8 -9 685.80 -37.4 -37.8 -37.5 73 -99 SPO 1997 04 07 00 25 309 8.0 -9 685.80 -37.4 -37.7 -37.5 73 -99 SPO 1997 04 07 00 26 310 8.0 -9 685.80 -37.5 -37.7 -37.5 74 -99 SPO 1997 04 07 00 27 310 8.0 -9 685.80 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 07 00 28 310 8.1 -9 685.70 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 07 00 29 310 7.7 -9 685.70 -37.4 -37.6 -37.4 73 -99 SPO 1997 04 07 00 30 309 7.7 -9 685.70 -37.4 -37.5 -37.4 74 -99 SPO 1997 04 07 00 31 307 8.0 -9 685.70 -37.4 -37.4 -37.4 74 -99 SPO 1997 04 07 00 32 308 7.9 -9 685.70 -37.3 -37.4 -37.3 73 -99 SPO 1997 04 07 00 33 308 8.0 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 34 308 8.0 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 35 308 7.8 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 36 308 8.1 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 37 311 8.2 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 38 311 7.7 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 39 311 7.9 -9 685.70 -37.2 -37.4 -37.3 73 -99 SPO 1997 04 07 00 40 313 7.9 -9 685.60 -37.2 -37.4 -37.4 73 -99 SPO 1997 04 07 00 41 310 7.9 -9 685.70 -37.2 -37.4 -37.3 72 -99 SPO 1997 04 07 00 42 310 7.8 -9 685.60 -37.2 -37.4 -37.3 72 -99 SPO 1997 04 07 00 43 311 8.1 -9 685.60 -37.2 -37.4 -37.3 71 -99 SPO 1997 04 07 00 44 311 7.3 -9 685.60 -37.2 -37.5 -37.3 72 -99 SPO 1997 04 07 00 45 312 7.7 -9 685.60 -37.2 -37.5 -37.3 72 -99 SPO 1997 04 07 00 46 311 7.9 -9 685.60 -37.3 -37.6 -37.3 73 -99 SPO 1997 04 07 00 47 311 7.8 -9 685.60 -37.3 -37.6 -37.3 73 -99 SPO 1997 04 07 00 48 310 7.7 -9 685.60 -37.3 -37.6 -37.4 73 -99 SPO 1997 04 07 00 49 311 7.9 -9 685.60 -37.3 -37.6 -37.4 73 -99 SPO 1997 04 07 00 50 310 7.6 -9 685.70 -37.3 -37.6 -37.4 73 -99 SPO 1997 04 07 00 51 309 7.9 -9 685.60 -37.3 -37.6 -37.4 73 -99 SPO 1997 04 07 00 52 311 7.8 -9 685.60 -37.4 -37.6 -37.4 74 -99 SPO 1997 04 07 00 53 312 7.9 -9 685.60 -37.3 -37.6 -37.4 74 -99 SPO 1997 04 07 00 54 313 7.6 -9 685.60 -37.3 -37.6 -37.4 74 -99 SPO 1997 04 07 00 55 312 8.0 -9 685.60 -37.4 -37.6 -37.4 74 -99 SPO 1997 04 07 00 56 312 8.4 -9 685.60 -37.4 -37.6 -37.5 74 -99 SPO 1997 04 07 00 57 311 7.8 -9 685.60 -37.4 -37.7 -37.5 74 -99 SPO 1997 04 07 00 58 312 7.8 -9 685.60 -37.4 -37.7 -37.5 73 -99 SPO 1997 04 07 00 59 312 7.9 -9 685.60 -37.4 -37.7 -37.5 72 -99 SPO 1997 04 07 01 00 311 7.8 -9 685.60 -37.4 -37.7 -37.5 71 0 SPO 1997 04 07 01 01 313 7.7 -9 685.70 -37.4 -37.7 -37.6 72 -99 SPO 1997 04 07 01 02 313 7.7 -9 685.70 -37.5 -37.7 -37.6 74 -99 SPO 1997 04 07 01 03 314 7.4 -9 685.70 -37.5 -37.7 -37.6 73 -99 SPO 1997 04 07 01 04 314 7.4 -9 685.60 -37.5 -37.8 -37.6 72 -99 SPO 1997 04 07 01 05 314 7.9 -9 685.60 -37.5 -37.8 -37.7 72 -99 SPO 1997 04 07 01 06 314 8.1 -9 685.60 -37.5 -37.8 -37.7 73 -99 SPO 1997 04 07 01 07 313 7.6 -9 685.60 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 07 01 08 316 7.7 -9 685.60 -37.6 -37.8 -37.7 73 -99 SPO 1997 04 07 01 09 314 8.2 -9 685.60 -37.6 -37.9 -37.7 73 -99 SPO 1997 04 07 01 10 316 8.0 -9 685.60 -37.6 -38.0 -37.8 73 -99 SPO 1997 04 07 01 11 317 8.2 -9 685.50 -37.7 -38.0 -37.8 73 -99 SPO 1997 04 07 01 12 314 7.6 -9 685.60 -37.7 -38.1 -37.8 73 -99 SPO 1997 04 07 01 13 316 7.9 -9 685.60 -37.7 -38.1 -37.8 73 -99 SPO 1997 04 07 01 14 314 7.9 -9 685.60 -37.7 -38.1 -37.8 73 -99 SPO 1997 04 07 01 15 313 7.1 -9 685.60 -37.8 -38.1 -37.8 73 -99 SPO 1997 04 07 01 16 315 7.9 -9 685.60 -37.8 -38.1 -37.8 73 -99 SPO 1997 04 07 01 17 315 7.4 -9 685.50 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 18 315 7.4 -9 685.50 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 19 315 8.3 -9 685.40 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 20 317 8.3 -9 685.40 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 21 317 8.6 -9 685.40 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 22 316 8.4 -9 685.40 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 23 317 8.3 -9 685.40 -37.8 -38.1 -37.9 72 -99 SPO 1997 04 07 01 24 315 8.8 -9 685.40 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 25 317 8.3 -9 685.30 -37.8 -38.0 -37.9 73 -99 SPO 1997 04 07 01 26 318 8.4 -9 685.30 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 27 318 8.2 -9 685.30 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 28 318 8.3 -9 685.30 -37.8 -38.1 -37.9 73 -99 SPO 1997 04 07 01 29 317 9.1 -9 685.30 -37.8 -38.1 -38.0 73 -99 SPO 1997 04 07 01 30 317 8.7 -9 685.30 -37.9 -38.1 -38.0 73 -99 SPO 1997 04 07 01 31 316 9.1 -9 685.20 -37.9 -38.1 -38.0 72 -99 SPO 1997 04 07 01 32 315 8.3 -9 685.20 -37.9 -38.1 -38.0 72 -99 SPO 1997 04 07 01 33 318 8.5 -9 685.20 -37.9 -38.1 -38.0 72 -99 SPO 1997 04 07 01 34 318 8.7 -9 685.20 -37.9 -38.2 -38.0 72 -99 SPO 1997 04 07 01 35 317 8.7 -9 685.20 -38.0 -38.3 -38.1 73 -99 SPO 1997 04 07 01 36 316 8.5 -9 685.20 -38.0 -38.4 -38.1 -99 -99 SPO 1997 04 07 01 37 316 8.6 -9 685.20 -38.1 -38.4 -38.1 -99 -99 SPO 1997 04 07 01 38 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 07 01 39 -999 -99.9 -9 -999.90 -999.9 -999.9 -999.9 -99 -99 SPO 1997 04 07 01 40 317 8.1 -9 685.20 -38.1 -38.4 -38.2 -99 -99 SPO 1997 04 07 01 41 316 8.4 -9 685.20 -38.1 -38.5 -38.2 -99 -99 SPO 1997 04 07 01 42 315 8.5 -9 685.20 -38.1 -38.5 -38.2 73 -99 SPO 1997 04 07 01 43 315 7.7 -9 685.20 -38.2 -38.5 -38.2 73 -99 SPO 1997 04 07 01 44 315 7.3 -9 685.20 -38.2 -38.5 -38.2 73 -99 SPO 1997 04 07 01 45 315 7.7 -9 685.20 -38.2 -38.5 -38.2 73 -99 SPO 1997 04 07 01 46 316 8.0 -9 685.20 -38.1 -38.5 -38.2 71 -99 SPO 1997 04 07 01 47 318 7.7 -9 685.20 -38.2 -38.5 -38.2 73 -99 SPO 1997 04 07 01 48 321 7.4 -9 685.20 -38.2 -38.5 -38.3 73 -99 SPO 1997 04 07 01 49 317 7.8 -9 685.20 -38.2 -38.5 -38.3 73 -99 SPO 1997 04 07 01 50 320 7.7 -9 685.20 -38.2 -38.5 -38.3 73 -99 SPO 1997 04 07 01 51 317 7.7 -9 685.20 -38.2 -38.6 -38.3 73 -99 SPO 1997 04 07 01 52 319 8.1 -9 685.20 -38.3 -38.6 -38.4 73 -99 SPO 1997 04 07 01 53 318 7.4 -9 685.20 -38.3 -38.6 -38.4 73 -99 SPO 1997 04 07 01 54 317 7.2 -9 685.20 -38.3 -38.6 -38.4 73 -99 SPO 1997 04 07 01 55 318 7.5 -9 685.20 -38.3 -38.6 -38.4 73 -99 SPO 1997 04 07 01 56 320 8.2 -9 685.20 -38.3 -38.6 -38.4 73 -99 SPO 1997 04 07 01 57 320 8.3 -9 685.20 -38.3 -38.6 -38.5 73 -99 SPO 1997 04 07 01 58 321 7.7 -9 685.20 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 01 59 322 7.5 -9 685.20 -38.4 -38.7 -38.4 72 -99 SPO 1997 04 07 02 00 320 8.4 -9 685.20 -38.4 -38.7 -38.5 71 0 SPO 1997 04 07 02 01 318 8.8 -9 685.20 -38.5 -38.8 -38.6 73 -99 SPO 1997 04 07 02 02 318 7.7 -9 685.20 -38.5 -38.9 -38.6 72 -99 SPO 1997 04 07 02 03 319 7.8 -9 685.20 -38.5 -39.0 -38.6 72 -99 SPO 1997 04 07 02 04 318 7.8 -9 685.20 -38.5 -38.9 -38.6 73 -99 SPO 1997 04 07 02 05 318 8.1 -9 685.20 -38.6 -39.0 -38.6 73 -99 SPO 1997 04 07 02 06 320 8.2 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 07 320 8.0 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 08 319 8.5 -9 685.10 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 09 320 7.6 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 10 318 8.4 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 11 318 8.3 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 12 318 8.4 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 13 318 8.6 -9 685.10 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 14 316 8.1 -9 685.10 -38.6 -39.0 -38.7 72 -99 SPO 1997 04 07 02 15 317 8.3 -9 685.00 -38.6 -39.0 -38.7 72 -99 SPO 1997 04 07 02 16 315 8.5 -9 685.00 -38.6 -39.0 -38.7 72 -99 SPO 1997 04 07 02 17 320 8.1 -9 685.00 -38.6 -38.9 -38.7 72 -99 SPO 1997 04 07 02 18 321 8.3 -9 685.00 -38.6 -38.9 -38.7 72 -99 SPO 1997 04 07 02 19 320 8.4 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 20 317 8.5 -9 685.10 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 21 318 9.1 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 22 317 9.2 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 23 317 9.1 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 24 317 8.2 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 25 316 8.8 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 26 315 8.5 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 02 27 315 8.6 -9 685.00 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 02 28 315 8.7 -9 685.00 -38.6 -39.0 -38.7 72 -99 SPO 1997 04 07 02 29 316 8.4 -9 685.10 -38.6 -39.0 -38.7 72 -99 SPO 1997 04 07 02 30 317 8.5 -9 685.10 -38.6 -39.0 -38.8 72 -99 SPO 1997 04 07 02 31 317 8.7 -9 685.10 -38.6 -39.0 -38.8 73 -99 SPO 1997 04 07 02 32 315 8.7 -9 685.10 -38.6 -39.0 -38.8 73 -99 SPO 1997 04 07 02 33 315 8.5 -9 685.10 -38.6 -39.0 -38.8 72 -99 SPO 1997 04 07 02 34 316 8.7 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 35 316 8.2 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 36 317 8.7 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 37 316 8.8 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 38 317 8.5 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 39 316 8.7 -9 685.20 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 40 315 8.2 -9 685.20 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 41 317 8.0 -9 685.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 02 42 318 8.3 -9 685.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 02 43 319 8.4 -9 685.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 02 44 319 7.7 -9 685.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 02 45 320 8.3 -9 685.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 02 46 319 8.4 -9 685.20 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 47 318 8.5 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 02 48 320 8.4 -9 685.10 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 02 49 320 8.7 -9 685.10 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 02 50 320 8.6 -9 685.10 -38.7 -39.1 -38.9 72 -99 SPO 1997 04 07 02 51 320 8.5 -9 685.10 -38.8 -39.1 -38.9 73 -99 SPO 1997 04 07 02 52 319 8.5 -9 685.10 -38.8 -39.2 -38.9 73 -99 SPO 1997 04 07 02 53 320 8.5 -9 685.10 -38.7 -39.2 -38.9 72 -99 SPO 1997 04 07 02 54 319 8.9 -9 685.10 -38.8 -39.2 -38.9 73 -99 SPO 1997 04 07 02 55 318 8.8 -9 685.10 -38.8 -39.2 -38.9 72 -99 SPO 1997 04 07 02 56 317 8.9 -9 685.10 -38.8 -39.2 -38.9 71 -99 SPO 1997 04 07 02 57 318 8.7 -9 685.00 -38.8 -39.2 -38.9 71 -99 SPO 1997 04 07 02 58 319 9.2 -9 685.00 -38.8 -39.1 -38.9 71 -99 SPO 1997 04 07 02 59 319 9.3 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 03 00 319 8.3 -9 685.00 -38.8 -39.1 -38.9 72 0 SPO 1997 04 07 03 01 318 8.2 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 03 02 318 8.7 -9 685.00 -38.8 -39.1 -38.8 72 -99 SPO 1997 04 07 03 03 317 8.3 -9 685.10 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 03 04 316 7.9 -9 685.10 -38.8 -39.0 -38.8 72 -99 SPO 1997 04 07 03 05 315 7.8 -9 685.20 -38.8 -39.0 -38.8 72 -99 SPO 1997 04 07 03 06 313 8.3 -9 685.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 03 07 313 7.5 -9 685.20 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 03 08 315 8.1 -9 685.10 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 03 09 316 8.0 -9 685.10 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 03 10 317 8.0 -9 685.10 -38.7 -38.9 -38.7 73 -99 SPO 1997 04 07 03 11 317 8.4 -9 685.10 -38.7 -38.9 -38.7 72 -99 SPO 1997 04 07 03 12 317 8.5 -9 685.10 -38.6 -38.8 -38.7 71 -99 SPO 1997 04 07 03 13 316 8.6 -9 685.00 -38.6 -38.9 -38.7 71 -99 SPO 1997 04 07 03 14 317 8.3 -9 685.00 -38.6 -38.9 -38.7 72 -99 SPO 1997 04 07 03 15 317 8.6 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 03 16 316 8.2 -9 685.00 -38.6 -38.9 -38.7 73 -99 SPO 1997 04 07 03 17 317 8.1 -9 685.00 -38.6 -39.0 -38.7 73 -99 SPO 1997 04 07 03 18 316 8.5 -9 685.00 -38.5 -39.0 -38.7 72 -99 SPO 1997 04 07 03 19 316 7.8 -9 685.10 -38.5 -38.9 -38.6 72 -99 SPO 1997 04 07 03 20 315 8.2 -9 685.00 -38.5 -38.9 -38.6 73 -99 SPO 1997 04 07 03 21 315 7.9 -9 685.10 -38.5 -38.9 -38.6 73 -99 SPO 1997 04 07 03 22 315 8.2 -9 685.10 -38.5 -38.8 -38.6 73 -99 SPO 1997 04 07 03 23 315 7.7 -9 685.10 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 24 315 8.0 -9 685.10 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 25 315 7.6 -9 685.10 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 26 316 7.8 -9 685.10 -38.6 -38.8 -38.6 73 -99 SPO 1997 04 07 03 27 316 7.7 -9 685.10 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 28 315 7.9 -9 685.10 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 29 317 8.0 -9 685.20 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 30 318 7.7 -9 685.20 -38.6 -38.7 -38.6 73 -99 SPO 1997 04 07 03 31 318 8.0 -9 685.20 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 03 32 317 8.1 -9 685.30 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 03 33 317 8.0 -9 685.30 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 03 34 317 7.8 -9 685.30 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 03 35 317 7.9 -9 685.30 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 03 36 316 8.1 -9 685.30 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 03 37 316 8.0 -9 685.30 -38.6 -38.7 -38.6 72 -99 SPO 1997 04 07 03 38 316 7.8 -9 685.30 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 39 316 7.7 -9 685.30 -38.6 -38.8 -38.6 73 -99 SPO 1997 04 07 03 40 317 8.1 -9 685.30 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 03 41 317 8.0 -9 685.30 -38.6 -38.8 -38.6 72 -99 SPO 1997 04 07 03 42 317 7.9 -9 685.30 -38.5 -38.8 -38.6 71 -99 SPO 1997 04 07 03 43 315 8.1 -9 685.30 -38.5 -38.8 -38.6 72 -99 SPO 1997 04 07 03 44 315 7.9 -9 685.30 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 03 45 314 8.5 -9 685.30 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 03 46 314 8.4 -9 685.30 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 03 47 313 8.2 -9 685.40 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 03 48 312 8.0 -9 685.40 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 03 49 313 7.4 -9 685.40 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 03 50 313 7.3 -9 685.40 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 03 51 312 7.8 -9 685.40 -38.5 -38.7 -38.5 73 -99 SPO 1997 04 07 03 52 313 7.8 -9 685.40 -38.5 -38.7 -38.5 73 -99 SPO 1997 04 07 03 53 314 7.7 -9 685.40 -38.5 -38.7 -38.5 73 -99 SPO 1997 04 07 03 54 313 7.4 -9 685.40 -38.4 -38.6 -38.5 71 -99 SPO 1997 04 07 03 55 313 7.2 -9 685.40 -38.4 -38.6 -38.5 71 -99 SPO 1997 04 07 03 56 312 7.5 -9 685.40 -38.4 -38.6 -38.5 71 -99 SPO 1997 04 07 03 57 311 7.3 -9 685.40 -38.4 -38.6 -38.5 72 -99 SPO 1997 04 07 03 58 313 7.5 -9 685.40 -38.4 -38.6 -38.5 73 -99 SPO 1997 04 07 03 59 313 7.4 -9 685.40 -38.4 -38.6 -38.5 73 -99 SPO 1997 04 07 04 00 312 7.9 -9 685.40 -38.4 -38.6 -38.5 72 0 SPO 1997 04 07 04 01 314 7.3 -9 685.40 -38.4 -38.6 -38.5 73 -99 SPO 1997 04 07 04 02 314 7.0 -9 685.40 -38.4 -38.6 -38.5 73 -99 SPO 1997 04 07 04 03 314 7.5 -9 685.40 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 04 04 313 7.8 -9 685.40 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 04 05 312 7.6 -9 685.40 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 04 06 311 7.2 -9 685.40 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 04 07 312 7.3 -9 685.40 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 04 08 314 7.4 -9 685.40 -38.4 -38.7 -38.5 73 -99 SPO 1997 04 07 04 09 314 7.6 -9 685.40 -38.4 -38.7 -38.5 72 -99 SPO 1997 04 07 04 10 316 7.9 -9 685.30 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 04 11 315 7.9 -9 685.30 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 12 316 7.7 -9 685.30 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 13 317 8.1 -9 685.20 -38.5 -38.7 -38.5 73 -99 SPO 1997 04 07 04 14 318 8.7 -9 685.20 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 15 318 8.5 -9 685.20 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 16 318 8.5 -9 685.10 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 17 319 8.1 -9 685.10 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 18 320 8.3 -9 685.20 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 19 320 8.0 -9 685.20 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 20 321 7.8 -9 685.20 -38.5 -38.7 -38.6 73 -99 SPO 1997 04 07 04 21 322 8.1 -9 685.20 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 04 22 322 7.5 -9 685.20 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 04 23 323 7.8 -9 685.20 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 04 24 323 8.0 -9 685.20 -38.6 -38.8 -38.7 72 -99 SPO 1997 04 07 04 25 325 7.2 -9 685.20 -38.6 -38.8 -38.7 72 -99 SPO 1997 04 07 04 26 325 7.1 -9 685.30 -38.6 -38.9 -38.7 72 -99 SPO 1997 04 07 04 27 325 7.0 -9 685.30 -38.6 -38.9 -38.8 73 -99 SPO 1997 04 07 04 28 322 7.6 -9 685.30 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 04 29 324 7.2 -9 685.30 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 04 30 323 7.7 -9 685.30 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 04 31 322 7.6 -9 685.30 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 04 32 323 7.2 -9 685.30 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 04 33 324 7.1 -9 685.30 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 04 34 323 7.7 -9 685.30 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 04 35 322 7.6 -9 685.30 -38.8 -39.0 -38.9 74 -99 SPO 1997 04 07 04 36 322 7.7 -9 685.30 -38.8 -39.0 -38.9 74 -99 SPO 1997 04 07 04 37 322 7.4 -9 685.30 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 04 38 323 7.2 -9 685.30 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 04 39 323 7.2 -9 685.20 -38.8 -39.0 -38.9 71 -99 SPO 1997 04 07 04 40 325 7.3 -9 685.20 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 41 325 8.1 -9 685.20 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 42 328 7.6 -9 685.10 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 04 43 326 7.9 -9 685.10 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 04 44 327 7.6 -9 685.10 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 04 45 327 7.7 -9 685.10 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 04 46 327 7.7 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 04 47 326 7.9 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 04 48 326 7.8 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 04 49 326 7.9 -9 685.00 -38.8 -39.1 -38.9 73 -99 SPO 1997 04 07 04 50 325 8.2 -9 685.00 -38.8 -39.1 -38.9 73 -99 SPO 1997 04 07 04 51 326 7.9 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 52 325 7.9 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 53 325 7.6 -9 684.90 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 54 325 8.3 -9 684.90 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 55 324 7.9 -9 684.90 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 56 324 7.5 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 57 324 7.4 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 58 324 7.4 -9 685.00 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 04 59 323 7.3 -9 685.00 -38.9 -39.1 -38.9 73 -99 SPO 1997 04 07 05 00 325 7.2 -9 685.00 -38.9 -39.0 -38.9 73 0 SPO 1997 04 07 05 01 326 6.8 -9 685.00 -38.9 -39.1 -38.9 74 -99 SPO 1997 04 07 05 02 324 6.8 -9 685.00 -38.9 -39.1 -38.9 74 -99 SPO 1997 04 07 05 03 324 7.1 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 05 04 324 6.9 -9 685.00 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 05 05 325 6.7 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 05 06 324 6.4 -9 685.00 -38.9 -39.0 -38.9 72 -99 SPO 1997 04 07 05 07 324 6.5 -9 685.00 -38.9 -39.0 -38.9 72 -99 SPO 1997 04 07 05 08 323 6.9 -9 685.00 -38.9 -39.0 -38.9 71 -99 SPO 1997 04 07 05 09 322 7.1 -9 685.00 -38.8 -39.0 -38.9 71 -99 SPO 1997 04 07 05 10 322 7.2 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 05 11 323 7.3 -9 685.00 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 05 12 322 7.3 -9 685.00 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 05 13 322 7.0 -9 685.00 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 05 14 323 6.7 -9 685.00 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 05 15 323 6.9 -9 685.00 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 05 16 324 7.4 -9 685.00 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 05 17 325 7.4 -9 684.90 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 05 18 326 7.3 -9 684.90 -38.7 -39.0 -38.9 72 -99 SPO 1997 04 07 05 19 325 7.0 -9 684.90 -38.7 -39.0 -38.9 72 -99 SPO 1997 04 07 05 20 324 6.7 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 05 21 322 6.5 -9 685.00 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 05 22 323 6.4 -9 685.00 -38.8 -39.0 -38.8 71 -99 SPO 1997 04 07 05 23 324 6.3 -9 685.00 -38.8 -39.0 -38.8 71 -99 SPO 1997 04 07 05 24 322 6.3 -9 685.00 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 05 25 320 6.2 -9 685.00 -38.8 -38.9 -38.8 72 -99 SPO 1997 04 07 05 26 318 5.8 -9 685.00 -38.7 -38.9 -38.8 72 -99 SPO 1997 04 07 05 27 316 6.0 -9 685.00 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 05 28 316 6.3 -9 685.00 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 05 29 316 6.0 -9 685.00 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 05 30 319 6.2 -9 685.10 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 31 316 5.9 -9 685.00 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 32 319 6.0 -9 685.00 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 33 319 6.4 -9 685.00 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 34 321 6.2 -9 685.00 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 35 318 6.4 -9 685.00 -38.6 -38.7 -38.7 72 -99 SPO 1997 04 07 05 36 318 6.4 -9 684.90 -38.6 -38.7 -38.7 71 -99 SPO 1997 04 07 05 37 318 6.5 -9 684.90 -38.6 -38.8 -38.7 71 -99 SPO 1997 04 07 05 38 318 6.9 -9 684.90 -38.6 -38.8 -38.7 71 -99 SPO 1997 04 07 05 39 317 7.1 -9 684.90 -38.6 -38.8 -38.7 72 -99 SPO 1997 04 07 05 40 317 7.7 -9 684.80 -38.6 -38.8 -38.6 73 -99 SPO 1997 04 07 05 41 316 7.8 -9 684.90 -38.5 -38.8 -38.6 72 -99 SPO 1997 04 07 05 42 315 7.6 -9 684.90 -38.6 -38.8 -38.6 73 -99 SPO 1997 04 07 05 43 315 7.3 -9 684.80 -38.6 -38.8 -38.6 73 -99 SPO 1997 04 07 05 44 314 7.5 -9 684.80 -38.6 -38.8 -38.6 73 -99 SPO 1997 04 07 05 45 315 6.8 -9 684.80 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 05 46 316 7.1 -9 684.80 -38.5 -38.8 -38.6 72 -99 SPO 1997 04 07 05 47 315 7.8 -9 684.80 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 48 313 7.8 -9 684.80 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 49 314 7.6 -9 684.80 -38.6 -38.8 -38.7 73 -99 SPO 1997 04 07 05 50 314 7.8 -9 684.80 -38.6 -38.7 -38.6 73 -99 SPO 1997 04 07 05 51 313 8.0 -9 684.80 -38.6 -38.7 -38.6 73 -99 SPO 1997 04 07 05 52 312 7.5 -9 684.70 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 05 53 313 7.5 -9 684.70 -38.5 -38.7 -38.6 72 -99 SPO 1997 04 07 05 54 314 7.7 -9 684.70 -38.5 -38.6 -38.6 73 -99 SPO 1997 04 07 05 55 316 8.2 -9 684.70 -38.5 -38.6 -38.5 73 -99 SPO 1997 04 07 05 56 315 8.1 -9 684.70 -38.5 -38.6 -38.5 73 -99 SPO 1997 04 07 05 57 316 8.0 -9 684.70 -38.4 -38.6 -38.5 72 -99 SPO 1997 04 07 05 58 317 8.0 -9 684.70 -38.4 -38.5 -38.4 72 -99 SPO 1997 04 07 05 59 318 7.9 -9 684.70 -38.4 -38.5 -38.4 73 -99 SPO 1997 04 07 06 00 318 8.1 -9 684.70 -38.4 -38.5 -38.4 73 0 SPO 1997 04 07 06 01 318 7.8 -9 684.70 -38.3 -38.5 -38.4 72 -99 SPO 1997 04 07 06 02 317 7.5 -9 684.70 -38.3 -38.5 -38.4 72 -99 SPO 1997 04 07 06 03 318 7.4 -9 684.70 -38.3 -38.5 -38.3 73 -99 SPO 1997 04 07 06 04 320 7.4 -9 684.70 -38.3 -38.5 -38.4 73 -99 SPO 1997 04 07 06 05 319 7.8 -9 684.60 -38.3 -38.5 -38.4 73 -99 SPO 1997 04 07 06 06 321 7.7 -9 684.60 -38.4 -38.5 -38.4 73 -99 SPO 1997 04 07 06 07 320 7.6 -9 684.60 -38.3 -38.5 -38.4 72 -99 SPO 1997 04 07 06 08 318 7.6 -9 684.60 -38.3 -38.5 -38.4 73 -99 SPO 1997 04 07 06 09 318 7.6 -9 684.60 -38.3 -38.5 -38.4 73 -99 SPO 1997 04 07 06 10 318 8.0 -9 684.60 -38.3 -38.5 -38.4 73 -99 SPO 1997 04 07 06 11 319 8.1 -9 684.60 -38.4 -38.5 -38.5 73 -99 SPO 1997 04 07 06 12 320 7.8 -9 684.50 -38.4 -38.5 -38.4 73 -99 SPO 1997 04 07 06 13 321 7.2 -9 684.50 -38.4 -38.4 -38.4 73 -99 SPO 1997 04 07 06 14 321 7.4 -9 684.50 -38.4 -38.5 -38.4 73 -99 SPO 1997 04 07 06 15 322 7.6 -9 684.40 -38.3 -38.4 -38.4 73 -99 SPO 1997 04 07 06 16 322 7.4 -9 684.50 -38.3 -38.3 -38.4 73 -99 SPO 1997 04 07 06 17 324 7.5 -9 684.50 -38.3 -38.4 -38.4 73 -99 SPO 1997 04 07 06 18 326 7.0 -9 684.40 -38.3 -38.4 -38.4 73 -99 SPO 1997 04 07 06 19 325 7.0 -9 684.40 -38.3 -38.4 -38.4 72 -99 SPO 1997 04 07 06 20 327 6.7 -9 684.40 -38.4 -38.5 -38.5 73 -99 SPO 1997 04 07 06 21 327 6.6 -9 684.40 -38.5 -38.6 -38.6 73 -99 SPO 1997 04 07 06 22 328 6.7 -9 684.40 -38.5 -38.6 -38.7 73 -99 SPO 1997 04 07 06 23 329 6.6 -9 684.40 -38.6 -38.6 -38.7 73 -99 SPO 1997 04 07 06 24 328 7.0 -9 684.40 -38.6 -38.6 -38.7 73 -99 SPO 1997 04 07 06 25 328 6.9 -9 684.40 -38.6 -38.6 -38.7 72 -99 SPO 1997 04 07 06 26 330 6.9 -9 684.40 -38.6 -38.7 -38.7 72 -99 SPO 1997 04 07 06 27 327 6.9 -9 684.40 -38.6 -38.7 -38.7 73 -99 SPO 1997 04 07 06 28 327 6.6 -9 684.50 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 06 29 325 7.2 -9 684.50 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 06 30 323 7.0 -9 684.50 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 06 31 323 6.8 -9 684.50 -38.8 -38.8 -38.9 74 -99 SPO 1997 04 07 06 32 325 6.8 -9 684.50 -38.8 -38.8 -38.9 74 -99 SPO 1997 04 07 06 33 324 7.0 -9 684.50 -38.8 -38.8 -38.9 72 -99 SPO 1997 04 07 06 34 325 6.9 -9 684.50 -38.8 -38.8 -38.9 71 -99 SPO 1997 04 07 06 35 326 6.7 -9 684.40 -38.9 -38.8 -38.9 71 -99 SPO 1997 04 07 06 36 324 6.4 -9 684.40 -38.9 -38.8 -39.0 71 -99 SPO 1997 04 07 06 37 326 6.6 -9 684.40 -38.9 -38.8 -39.0 71 -99 SPO 1997 04 07 06 38 327 7.0 -9 684.40 -38.9 -38.8 -39.0 72 -99 SPO 1997 04 07 06 39 328 6.8 -9 684.30 -38.9 -38.8 -39.0 72 -99 SPO 1997 04 07 06 40 326 6.9 -9 684.40 -39.0 -38.7 -39.0 72 -99 SPO 1997 04 07 06 41 326 7.0 -9 684.40 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 42 325 7.1 -9 684.40 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 43 324 7.2 -9 684.40 -39.0 -38.8 -39.1 72 -99 SPO 1997 04 07 06 44 324 7.3 -9 684.40 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 45 324 7.2 -9 684.30 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 46 322 7.2 -9 684.40 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 47 323 7.0 -9 684.40 -39.0 -38.8 -39.1 72 -99 SPO 1997 04 07 06 48 322 6.9 -9 684.40 -39.0 -38.8 -39.1 70 -99 SPO 1997 04 07 06 49 320 6.9 -9 684.50 -39.1 -38.8 -39.1 70 -99 SPO 1997 04 07 06 50 319 7.0 -9 684.50 -39.1 -38.9 -39.1 71 -99 SPO 1997 04 07 06 51 317 7.1 -9 684.50 -39.1 -38.9 -39.1 72 -99 SPO 1997 04 07 06 52 317 7.3 -9 684.50 -39.1 -38.8 -39.1 72 -99 SPO 1997 04 07 06 53 316 7.4 -9 684.50 -39.1 -38.8 -39.1 72 -99 SPO 1997 04 07 06 54 315 7.3 -9 684.50 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 55 316 7.5 -9 684.50 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 56 318 7.4 -9 684.50 -39.0 -38.8 -39.0 72 -99 SPO 1997 04 07 06 57 318 7.3 -9 684.40 -39.0 -38.7 -39.0 72 -99 SPO 1997 04 07 06 58 319 7.5 -9 684.40 -39.0 -38.8 -39.1 72 -99 SPO 1997 04 07 06 59 318 7.4 -9 684.40 -39.0 -38.8 -39.1 72 -99 SPO 1997 04 07 07 00 317 7.4 -9 684.40 -39.0 -38.8 -39.1 71 0 SPO 1997 04 07 07 01 317 7.5 -9 684.40 -39.1 -38.8 -39.1 72 -99 SPO 1997 04 07 07 02 319 7.2 -9 684.40 -39.1 -38.8 -39.2 71 -99 SPO 1997 04 07 07 03 320 7.3 -9 684.40 -39.1 -38.8 -39.2 71 -99 SPO 1997 04 07 07 04 320 7.0 -9 684.40 -39.1 -38.8 -39.2 71 -99 SPO 1997 04 07 07 05 322 7.1 -9 684.40 -39.1 -38.9 -39.2 70 -99 SPO 1997 04 07 07 06 322 7.1 -9 684.40 -39.2 -38.9 -39.2 72 -99 SPO 1997 04 07 07 07 324 7.2 -9 684.30 -39.2 -38.9 -39.3 72 -99 SPO 1997 04 07 07 08 324 7.1 -9 684.30 -39.2 -38.8 -39.3 72 -99 SPO 1997 04 07 07 09 325 7.2 -9 684.30 -39.2 -38.8 -39.3 72 -99 SPO 1997 04 07 07 10 325 7.0 -9 684.30 -39.2 -38.8 -39.3 72 -99 SPO 1997 04 07 07 11 325 7.2 -9 684.30 -39.3 -38.8 -39.4 72 -99 SPO 1997 04 07 07 12 325 7.3 -9 684.30 -39.3 -38.9 -39.4 71 -99 SPO 1997 04 07 07 13 325 7.5 -9 684.30 -39.3 -39.0 -39.4 72 -99 SPO 1997 04 07 07 14 326 7.5 -9 684.30 -39.4 -39.0 -39.4 72 -99 SPO 1997 04 07 07 15 325 7.7 -9 684.20 -39.4 -39.0 -39.5 72 -99 SPO 1997 04 07 07 16 325 7.9 -9 684.20 -39.4 -39.0 -39.5 72 -99 SPO 1997 04 07 07 17 324 8.0 -9 684.20 -39.4 -39.0 -39.5 71 -99 SPO 1997 04 07 07 18 323 8.2 -9 684.20 -39.5 -39.0 -39.5 71 -99 SPO 1997 04 07 07 19 321 8.5 -9 684.20 -39.5 -39.0 -39.6 71 -99 SPO 1997 04 07 07 20 320 8.1 -9 684.20 -39.5 -39.0 -39.6 71 -99 SPO 1997 04 07 07 21 321 7.7 -9 684.30 -39.6 -39.0 -39.7 72 -99 SPO 1997 04 07 07 22 321 8.2 -9 684.20 -39.6 -38.9 -39.6 72 -99 SPO 1997 04 07 07 23 321 8.3 -9 684.20 -39.6 -38.9 -39.6 72 -99 SPO 1997 04 07 07 24 320 7.9 -9 684.20 -39.6 -38.8 -39.7 72 -99 SPO 1997 04 07 07 25 318 7.5 -9 684.30 -39.7 -38.9 -39.7 72 -99 SPO 1997 04 07 07 26 318 7.2 -9 684.30 -39.7 -38.9 -39.8 72 -99 SPO 1997 04 07 07 27 318 7.1 -9 684.30 -39.8 -38.9 -40.0 72 -99 SPO 1997 04 07 07 28 317 7.0 -9 684.30 -39.9 -38.9 -40.0 71 -99 SPO 1997 04 07 07 29 317 6.8 -9 684.30 -39.9 -38.9 -40.0 71 -99 SPO 1997 04 07 07 30 320 7.0 -9 684.30 -40.0 -38.9 -40.0 71 -99 SPO 1997 04 07 07 31 320 6.8 -9 684.30 -40.0 -39.0 -40.1 71 -99 SPO 1997 04 07 07 32 322 7.1 -9 684.20 -40.1 -39.0 -40.2 71 -99 SPO 1997 04 07 07 33 323 7.0 -9 684.20 -40.1 -39.1 -40.2 70 -99 SPO 1997 04 07 07 34 323 6.9 -9 684.20 -40.1 -39.1 -40.2 70 -99 SPO 1997 04 07 07 35 324 7.1 -9 684.20 -40.2 -39.2 -40.3 71 -99 SPO 1997 04 07 07 36 326 7.0 -9 684.20 -40.3 -39.2 -40.3 71 -99 SPO 1997 04 07 07 37 324 7.0 -9 684.20 -40.4 -39.4 -40.4 71 -99 SPO 1997 04 07 07 38 323 7.0 -9 684.20 -40.4 -39.4 -40.5 71 -99 SPO 1997 04 07 07 39 324 7.0 -9 684.20 -40.5 -39.5 -40.5 71 -99 SPO 1997 04 07 07 40 324 7.1 -9 684.20 -40.5 -39.5 -40.5 70 -99 SPO 1997 04 07 07 41 323 7.1 -9 684.20 -40.5 -39.5 -40.5 70 -99 SPO 1997 04 07 07 42 322 7.0 -9 684.20 -40.5 -39.6 -40.5 70 -99 SPO 1997 04 07 07 43 323 7.1 -9 684.20 -40.5 -39.6 -40.5 70 -99 SPO 1997 04 07 07 44 324 7.3 -9 684.10 -40.5 -39.6 -40.6 70 -99 SPO 1997 04 07 07 45 322 7.2 -9 684.10 -40.5 -39.6 -40.6 69 -99 SPO 1997 04 07 07 46 321 7.1 -9 684.10 -40.5 -39.6 -40.5 69 -99 SPO 1997 04 07 07 47 320 7.1 -9 684.10 -40.5 -39.5 -40.5 69 -99 SPO 1997 04 07 07 48 318 7.0 -9 684.10 -40.5 -39.6 -40.5 69 -99 SPO 1997 04 07 07 49 316 7.0 -9 684.10 -40.5 -39.6 -40.5 69 -99 SPO 1997 04 07 07 50 315 7.2 -9 684.10 -40.5 -39.6 -40.5 70 -99 SPO 1997 04 07 07 51 314 7.3 -9 684.10 -40.4 -39.6 -40.4 69 -99 SPO 1997 04 07 07 52 314 7.2 -9 684.10 -40.3 -39.6 -40.3 71 -99 SPO 1997 04 07 07 53 315 7.1 -9 684.00 -40.2 -39.6 -40.2 70 -99 SPO 1997 04 07 07 54 314 7.4 -9 684.00 -40.2 -39.6 -40.2 71 -99 SPO 1997 04 07 07 55 313 7.1 -9 684.00 -40.2 -39.6 -40.2 71 -99 SPO 1997 04 07 07 56 312 7.2 -9 684.00 -40.1 -39.6 -40.1 71 -99 SPO 1997 04 07 07 57 314 7.2 -9 684.00 -40.0 -39.6 -40.1 71 -99 SPO 1997 04 07 07 58 311 6.9 -9 684.00 -40.0 -39.6 -40.1 70 -99 SPO 1997 04 07 07 59 311 6.9 -9 684.00 -40.0 -39.6 -40.1 69 -99 SPO 1997 04 07 08 00 312 6.5 -9 684.00 -40.0 -39.7 -40.2 70 0 SPO 1997 04 07 08 01 314 6.5 -9 683.90 -40.1 -39.8 -40.2 70 -99 SPO 1997 04 07 08 02 315 6.5 -9 683.90 -40.2 -39.9 -40.3 71 -99 SPO 1997 04 07 08 03 316 6.7 -9 683.90 -40.2 -39.9 -40.3 71 -99 SPO 1997 04 07 08 04 317 6.8 -9 683.80 -40.2 -39.9 -40.3 71 -99 SPO 1997 04 07 08 05 317 6.9 -9 683.80 -40.2 -39.9 -40.3 71 -99 SPO 1997 04 07 08 06 317 7.0 -9 683.80 -40.2 -39.8 -40.3 71 -99 SPO 1997 04 07 08 07 317 7.9 -9 683.70 -40.2 -39.8 -40.3 71 -99 SPO 1997 04 07 08 08 316 8.5 -9 683.70 -40.2 -39.7 -40.0 71 -99 SPO 1997 04 07 08 09 314 8.2 -9 683.70 -40.0 -39.6 -40.0 71 -99 SPO 1997 04 07 08 10 315 7.8 -9 683.70 -40.0 -39.6 -40.1 71 -99 SPO 1997 04 07 08 11 314 7.4 -9 683.80 -40.1 -39.7 -40.2 72 -99 SPO 1997 04 07 08 12 313 7.7 -9 683.70 -40.1 -39.7 -40.1 71 -99 SPO 1997 04 07 08 13 315 7.7 -9 683.70 -40.0 -39.7 -40.1 71 -99 SPO 1997 04 07 08 14 318 7.9 -9 683.60 -40.0 -39.7 -40.1 71 -99 SPO 1997 04 07 08 15 319 8.0 -9 683.60 -40.0 -39.6 -40.1 71 -99 SPO 1997 04 07 08 16 322 8.4 -9 683.50 -40.0 -39.6 -40.0 71 -99 SPO 1997 04 07 08 17 322 8.4 -9 683.40 -40.0 -39.5 -40.0 71 -99 SPO 1997 04 07 08 18 324 8.1 -9 683.40 -40.0 -39.5 -40.1 71 -99 SPO 1997 04 07 08 19 323 8.2 -9 683.40 -40.0 -39.6 -40.1 71 -99 SPO 1997 04 07 08 20 322 8.3 -9 683.40 -40.0 -39.6 -40.0 72 -99 SPO 1997 04 07 08 21 321 7.9 -9 683.40 -39.9 -39.6 -40.0 71 -99 SPO 1997 04 07 08 22 321 8.2 -9 683.50 -39.9 -39.5 -40.0 71 -99 SPO 1997 04 07 08 23 321 8.2 -9 683.50 -39.9 -39.5 -40.0 71 -99 SPO 1997 04 07 08 24 319 7.9 -9 683.40 -39.9 -39.6 -39.9 72 -99 SPO 1997 04 07 08 25 317 7.8 -9 683.50 -39.8 -39.6 -39.8 72 -99 SPO 1997 04 07 08 26 315 7.3 -9 683.50 -39.8 -39.6 -39.8 72 -99 SPO 1997 04 07 08 27 315 7.3 -9 683.50 -39.8 -39.6 -39.8 72 -99 SPO 1997 04 07 08 28 317 7.3 -9 683.50 -39.7 -39.6 -39.8 71 -99 SPO 1997 04 07 08 29 317 7.4 -9 683.50 -39.7 -39.6 -39.8 72 -99 SPO 1997 04 07 08 30 318 7.4 -9 683.50 -39.7 -39.5 -39.8 71 -99 SPO 1997 04 07 08 31 321 8.1 -9 683.50 -39.7 -39.6 -39.8 71 -99 SPO 1997 04 07 08 32 322 8.5 -9 683.40 -39.7 -39.5 -39.8 72 -99 SPO 1997 04 07 08 33 322 8.0 -9 683.40 -39.7 -39.5 -39.8 72 -99 SPO 1997 04 07 08 34 321 8.0 -9 683.40 -39.8 -39.5 -39.8 73 -99 SPO 1997 04 07 08 35 322 8.3 -9 683.40 -39.8 -39.5 -39.8 73 -99 SPO 1997 04 07 08 36 321 8.3 -9 683.30 -39.7 -39.4 -39.8 72 -99 SPO 1997 04 07 08 37 320 8.4 -9 683.30 -39.7 -39.4 -39.7 72 -99 SPO 1997 04 07 08 38 319 9.8 -9 683.20 -39.7 -39.2 -39.6 72 -99 SPO 1997 04 07 08 39 323 8.8 -9 683.20 -39.6 -39.1 -39.5 72 -99 SPO 1997 04 07 08 40 323 8.3 -9 683.20 -39.5 -39.0 -39.6 72 -99 SPO 1997 04 07 08 41 320 8.2 -9 683.20 -39.6 -39.2 -39.6 72 -99 SPO 1997 04 07 08 42 322 8.5 -9 683.20 -39.6 -39.2 -39.6 72 -99 SPO 1997 04 07 08 43 323 8.1 -9 683.20 -39.6 -39.3 -39.7 72 -99 SPO 1997 04 07 08 44 323 8.1 -9 683.20 -39.6 -39.3 -39.7 72 -99 SPO 1997 04 07 08 45 324 8.0 -9 683.20 -39.6 -39.3 -39.7 71 -99 SPO 1997 04 07 08 46 324 7.8 -9 683.20 -39.6 -39.3 -39.7 71 -99 SPO 1997 04 07 08 47 323 8.0 -9 683.20 -39.6 -39.3 -39.7 72 -99 SPO 1997 04 07 08 48 323 7.6 -9 683.20 -39.6 -39.4 -39.7 72 -99 SPO 1997 04 07 08 49 322 7.6 -9 683.20 -39.6 -39.3 -39.6 72 -99 SPO 1997 04 07 08 50 324 7.2 -9 683.20 -39.5 -39.3 -39.6 72 -99 SPO 1997 04 07 08 51 324 7.2 -9 683.20 -39.5 -39.3 -39.6 72 -99 SPO 1997 04 07 08 52 322 6.7 -9 683.20 -39.5 -39.4 -39.5 72 -99 SPO 1997 04 07 08 53 322 6.4 -9 683.30 -39.5 -39.4 -39.5 72 -99 SPO 1997 04 07 08 54 323 6.8 -9 683.30 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 08 55 323 6.2 -9 683.30 -39.4 -39.3 -39.5 71 -99 SPO 1997 04 07 08 56 323 6.2 -9 683.30 -39.4 -39.3 -39.5 71 -99 SPO 1997 04 07 08 57 322 6.4 -9 683.30 -39.4 -39.3 -39.4 71 -99 SPO 1997 04 07 08 58 322 6.3 -9 683.30 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 08 59 322 6.2 -9 683.30 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 09 00 323 6.2 -9 683.30 -39.4 -39.4 -39.5 72 0 SPO 1997 04 07 09 01 323 6.2 -9 683.30 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 09 02 321 6.2 -9 683.30 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 09 03 323 5.9 -9 683.40 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 09 04 321 6.0 -9 683.40 -39.4 -39.4 -39.5 71 -99 SPO 1997 04 07 09 05 322 6.0 -9 683.40 -39.4 -39.4 -39.5 71 -99 SPO 1997 04 07 09 06 322 6.0 -9 683.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 04 07 09 07 323 5.9 -9 683.40 -39.4 -39.4 -39.5 72 -99 SPO 1997 04 07 09 08 325 5.6 -9 683.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 04 07 09 09 322 5.5 -9 683.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 04 07 09 10 323 5.8 -9 683.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 04 07 09 11 324 5.8 -9 683.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 04 07 09 12 324 5.9 -9 683.40 -39.4 -39.4 -39.4 72 -99 SPO 1997 04 07 09 13 325 5.4 -9 683.40 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 14 325 5.3 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 15 324 5.2 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 16 324 5.2 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 17 321 5.2 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 18 326 5.2 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 19 326 5.1 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 20 324 5.0 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 21 326 5.1 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 22 325 4.8 -9 683.50 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 09 23 324 5.1 -9 683.50 -39.3 -39.3 -39.4 72 -99 SPO 1997 04 07 09 24 325 4.9 -9 683.50 -39.3 -39.3 -39.4 72 -99 SPO 1997 04 07 09 25 323 4.8 -9 683.50 -39.3 -39.3 -39.3 72 -99 SPO 1997 04 07 09 26 323 5.1 -9 683.50 -39.3 -39.3 -39.3 72 -99 SPO 1997 04 07 09 27 323 5.1 -9 683.50 -39.2 -39.2 -39.3 72 -99 SPO 1997 04 07 09 28 323 5.3 -9 683.50 -39.2 -39.2 -39.3 72 -99 SPO 1997 04 07 09 29 324 5.3 -9 683.50 -39.2 -39.2 -39.3 72 -99 SPO 1997 04 07 09 30 323 5.4 -9 683.50 -39.2 -39.1 -39.2 72 -99 SPO 1997 04 07 09 31 322 5.5 -9 683.50 -39.2 -39.1 -39.2 72 -99 SPO 1997 04 07 09 32 324 5.2 -9 683.50 -39.1 -39.1 -39.2 71 -99 SPO 1997 04 07 09 33 325 5.2 -9 683.40 -39.1 -39.1 -39.2 71 -99 SPO 1997 04 07 09 34 323 5.7 -9 683.40 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 09 35 324 5.8 -9 683.40 -39.1 -39.2 -39.1 72 -99 SPO 1997 04 07 09 36 323 5.8 -9 683.40 -39.1 -39.2 -39.1 72 -99 SPO 1997 04 07 09 37 324 5.6 -9 683.40 -39.1 -39.1 -39.1 72 -99 SPO 1997 04 07 09 38 324 6.4 -9 683.40 -39.0 -39.1 -39.1 72 -99 SPO 1997 04 07 09 39 323 6.1 -9 683.30 -39.0 -39.1 -39.0 72 -99 SPO 1997 04 07 09 40 324 6.5 -9 683.30 -39.0 -39.1 -39.0 72 -99 SPO 1997 04 07 09 41 323 6.4 -9 683.30 -39.0 -39.1 -39.0 72 -99 SPO 1997 04 07 09 42 324 6.4 -9 683.30 -38.9 -39.0 -39.0 72 -99 SPO 1997 04 07 09 43 325 6.8 -9 683.30 -38.9 -39.0 -39.0 71 -99 SPO 1997 04 07 09 44 325 6.6 -9 683.30 -38.9 -39.0 -39.0 72 -99 SPO 1997 04 07 09 45 325 6.7 -9 683.30 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 09 46 325 6.5 -9 683.30 -38.9 -38.9 -38.9 73 -99 SPO 1997 04 07 09 47 324 6.6 -9 683.30 -38.9 -38.9 -38.9 73 -99 SPO 1997 04 07 09 48 323 6.9 -9 683.30 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 09 49 324 7.0 -9 683.30 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 09 50 324 6.7 -9 683.30 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 09 51 324 7.0 -9 683.30 -38.8 -38.8 -38.8 73 -99 SPO 1997 04 07 09 52 325 6.7 -9 683.30 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 09 53 326 6.4 -9 683.30 -38.8 -38.8 -38.8 73 -99 SPO 1997 04 07 09 54 326 6.7 -9 683.30 -38.8 -38.8 -38.8 72 -99 SPO 1997 04 07 09 55 325 6.4 -9 683.30 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 09 56 325 6.5 -9 683.30 -38.8 -38.8 -38.8 72 -99 SPO 1997 04 07 09 57 326 6.6 -9 683.30 -38.8 -38.9 -38.8 72 -99 SPO 1997 04 07 09 58 326 6.7 -9 683.30 -38.8 -38.9 -38.9 73 -99 SPO 1997 04 07 09 59 325 6.8 -9 683.30 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 10 00 327 6.7 -9 683.30 -38.8 -38.9 -38.8 73 0 SPO 1997 04 07 10 01 330 6.7 -9 683.30 -38.8 -39.0 -38.8 73 -99 SPO 1997 04 07 10 02 326 6.2 -9 683.30 -38.8 -38.9 -38.8 72 -99 SPO 1997 04 07 10 03 326 6.7 -9 683.30 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 10 04 326 6.6 -9 683.30 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 10 05 323 6.4 -9 683.30 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 10 06 322 6.2 -9 683.30 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 10 07 319 6.3 -9 683.40 -38.8 -38.8 -38.8 73 -99 SPO 1997 04 07 10 08 318 6.3 -9 683.40 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 09 318 6.4 -9 683.40 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 10 317 6.7 -9 683.40 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 10 11 317 6.3 -9 683.40 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 12 317 6.5 -9 683.40 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 13 318 6.3 -9 683.40 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 14 318 6.4 -9 683.30 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 15 321 7.1 -9 683.20 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 16 321 6.8 -9 683.20 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 17 320 6.8 -9 683.20 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 18 320 6.9 -9 683.20 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 19 318 7.0 -9 683.20 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 10 20 320 6.9 -9 683.20 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 10 21 320 6.9 -9 683.20 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 10 22 320 7.0 -9 683.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 10 23 322 7.0 -9 683.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 10 24 319 7.4 -9 683.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 10 25 320 7.1 -9 683.20 -38.7 -39.0 -38.8 72 -99 SPO 1997 04 07 10 26 321 6.9 -9 683.20 -38.7 -39.0 -38.8 70 -99 SPO 1997 04 07 10 27 322 7.1 -9 683.20 -38.8 -39.0 -38.8 72 -99 SPO 1997 04 07 10 28 322 7.3 -9 683.20 -38.7 -39.0 -38.9 72 -99 SPO 1997 04 07 10 29 323 6.9 -9 683.20 -38.7 -39.0 -38.9 72 -99 SPO 1997 04 07 10 30 323 6.7 -9 683.20 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 10 31 322 7.2 -9 683.20 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 10 32 322 6.8 -9 683.20 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 10 33 323 6.6 -9 683.20 -38.8 -39.0 -38.9 73 -99 SPO 1997 04 07 10 34 324 6.7 -9 683.20 -38.8 -38.9 -38.9 73 -99 SPO 1997 04 07 10 35 322 7.1 -9 683.20 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 10 36 322 7.2 -9 683.20 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 10 37 321 7.4 -9 683.20 -38.8 -38.9 -38.8 73 -99 SPO 1997 04 07 10 38 321 7.4 -9 683.20 -38.7 -38.9 -38.8 72 -99 SPO 1997 04 07 10 39 321 7.0 -9 683.20 -38.7 -38.9 -38.8 72 -99 SPO 1997 04 07 10 40 322 7.3 -9 683.20 -38.7 -38.9 -38.8 70 -99 SPO 1997 04 07 10 41 322 7.3 -9 683.20 -38.7 -38.9 -38.8 70 -99 SPO 1997 04 07 10 42 321 7.4 -9 683.20 -38.8 -38.8 -38.8 72 -99 SPO 1997 04 07 10 43 319 7.7 -9 683.20 -38.8 -38.8 -38.8 72 -99 SPO 1997 04 07 10 44 318 7.6 -9 683.20 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 10 45 318 7.8 -9 683.10 -38.8 -38.9 -38.8 71 -99 SPO 1997 04 07 10 46 317 7.7 -9 683.10 -38.7 -38.9 -38.8 72 -99 SPO 1997 04 07 10 47 317 7.9 -9 683.10 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 10 48 317 7.6 -9 683.10 -38.8 -38.9 -38.9 72 -99 SPO 1997 04 07 10 49 318 7.4 -9 683.10 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 10 50 319 7.7 -9 683.10 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 10 51 319 7.6 -9 683.10 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 10 52 321 7.5 -9 683.10 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 10 53 322 7.3 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 10 54 323 7.2 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 10 55 324 7.3 -9 683.10 -38.9 -39.0 -39.0 72 -99 SPO 1997 04 07 10 56 325 7.3 -9 683.10 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 10 57 327 7.1 -9 683.10 -38.9 -39.1 -38.9 73 -99 SPO 1997 04 07 10 58 328 7.1 -9 683.20 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 10 59 330 7.3 -9 683.10 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 11 00 330 7.2 -9 683.10 -38.9 -39.1 -39.0 72 0 SPO 1997 04 07 11 01 330 6.8 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 02 331 7.0 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 03 331 7.2 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 04 330 7.0 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 05 330 6.8 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 06 330 7.0 -9 683.10 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 07 330 7.0 -9 683.10 -38.9 -39.1 -39.0 71 -99 SPO 1997 04 07 11 08 329 7.1 -9 683.10 -38.9 -39.1 -39.0 70 -99 SPO 1997 04 07 11 09 331 6.9 -9 683.10 -38.9 -39.1 -39.0 70 -99 SPO 1997 04 07 11 10 330 6.6 -9 683.10 -38.9 -39.2 -39.0 71 -99 SPO 1997 04 07 11 11 330 6.6 -9 683.10 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 11 12 328 6.1 -9 683.20 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 11 13 327 6.1 -9 683.20 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 11 14 326 6.3 -9 683.20 -38.9 -39.1 -38.9 71 -99 SPO 1997 04 07 11 15 325 6.2 -9 683.20 -38.9 -39.1 -38.9 72 -99 SPO 1997 04 07 11 16 330 6.0 -9 683.20 -38.9 -39.1 -38.9 72 -99 SPO 1997 04 07 11 17 324 6.3 -9 683.20 -38.9 -39.1 -38.9 73 -99 SPO 1997 04 07 11 18 321 6.0 -9 683.20 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 11 19 326 5.8 -9 683.20 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 11 20 331 6.1 -9 683.20 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 11 21 329 6.2 -9 683.10 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 11 22 325 6.6 -9 683.10 -38.9 -39.2 -39.1 72 -99 SPO 1997 04 07 11 23 329 6.5 -9 683.10 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 24 328 6.9 -9 683.10 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 25 325 7.1 -9 683.10 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 26 327 6.6 -9 683.10 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 27 327 6.8 -9 683.00 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 28 328 7.3 -9 683.00 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 29 326 7.5 -9 683.00 -39.0 -39.2 -39.1 72 -99 SPO 1997 04 07 11 30 324 7.6 -9 682.90 -39.1 -39.2 -39.1 72 -99 SPO 1997 04 07 11 31 324 7.9 -9 682.90 -39.1 -39.2 -39.1 72 -99 SPO 1997 04 07 11 32 327 7.8 -9 682.90 -39.0 -39.2 -39.1 71 -99 SPO 1997 04 07 11 33 326 8.0 -9 682.90 -39.1 -39.2 -39.1 72 -99 SPO 1997 04 07 11 34 324 8.0 -9 682.90 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 11 35 326 8.2 -9 682.90 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 11 36 327 8.3 -9 682.90 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 11 37 325 8.8 -9 682.80 -39.1 -39.2 -39.2 71 -99 SPO 1997 04 07 11 38 325 8.1 -9 682.80 -39.1 -39.3 -39.2 71 -99 SPO 1997 04 07 11 39 325 8.3 -9 682.80 -39.1 -39.3 -39.2 71 -99 SPO 1997 04 07 11 40 327 8.5 -9 682.80 -39.1 -39.3 -39.2 71 -99 SPO 1997 04 07 11 41 328 8.5 -9 682.80 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 11 42 327 8.3 -9 682.80 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 11 43 331 8.5 -9 682.70 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 11 44 329 8.6 -9 682.70 -39.2 -39.3 -39.3 73 -99 SPO 1997 04 07 11 45 329 8.8 -9 682.70 -39.2 -39.4 -39.3 72 -99 SPO 1997 04 07 11 46 321 8.7 -9 682.70 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 11 47 323 8.9 -9 682.70 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 11 48 323 8.2 -9 682.70 -39.2 -39.2 -39.2 72 -99 SPO 1997 04 07 11 49 325 8.5 -9 682.70 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 11 50 328 8.8 -9 682.70 -39.2 -39.2 -39.3 72 -99 SPO 1997 04 07 11 51 329 8.6 -9 682.70 -39.2 -39.2 -39.3 72 -99 SPO 1997 04 07 11 52 327 9.0 -9 682.70 -39.2 -39.2 -39.2 71 -99 SPO 1997 04 07 11 53 322 8.2 -9 682.70 -39.2 -39.2 -39.2 72 -99 SPO 1997 04 07 11 54 330 8.5 -9 682.60 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 11 55 327 8.5 -9 682.70 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 11 56 324 8.0 -9 682.70 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 11 57 325 9.2 -9 682.60 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 11 58 330 8.8 -9 682.60 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 11 59 334 9.1 -9 682.50 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 12 00 330 8.4 -9 682.60 -39.1 -39.4 -39.2 72 0 SPO 1997 04 07 12 01 329 8.1 -9 682.60 -39.1 -39.4 -39.2 72 -99 SPO 1997 04 07 12 02 324 7.9 -9 682.60 -39.1 -39.4 -39.2 72 -99 SPO 1997 04 07 12 03 325 8.1 -9 682.60 -39.1 -39.4 -39.2 72 -99 SPO 1997 04 07 12 04 331 8.1 -9 682.60 -39.2 -39.4 -39.3 72 -99 SPO 1997 04 07 12 05 331 8.4 -9 682.60 -39.2 -39.4 -39.3 72 -99 SPO 1997 04 07 12 06 330 8.4 -9 682.60 -39.2 -39.4 -39.3 71 -99 SPO 1997 04 07 12 07 330 8.6 -9 682.60 -39.3 -39.3 -39.3 72 -99 SPO 1997 04 07 12 08 325 8.2 -9 682.60 -39.3 -39.3 -39.3 72 -99 SPO 1997 04 07 12 09 322 8.2 -9 682.70 -39.2 -39.4 -39.3 72 -99 SPO 1997 04 07 12 10 326 8.1 -9 682.70 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 12 11 324 7.7 -9 682.70 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 12 12 329 8.3 -9 682.70 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 12 13 327 8.5 -9 682.70 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 12 14 322 8.1 -9 682.70 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 12 15 321 8.5 -9 682.70 -39.2 -39.2 -39.2 72 -99 SPO 1997 04 07 12 16 323 8.1 -9 682.70 -39.2 -39.2 -39.2 72 -99 SPO 1997 04 07 12 17 325 8.4 -9 682.70 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 12 18 325 8.2 -9 682.70 -39.2 -39.3 -39.3 72 -99 SPO 1997 04 07 12 19 326 8.0 -9 682.70 -39.2 -39.3 -39.3 71 -99 SPO 1997 04 07 12 20 329 7.6 -9 682.70 -39.2 -39.3 -39.3 70 -99 SPO 1997 04 07 12 21 328 8.2 -9 682.70 -39.2 -39.3 -39.3 71 -99 SPO 1997 04 07 12 22 329 8.4 -9 682.70 -39.2 -39.4 -39.3 71 -99 SPO 1997 04 07 12 23 328 8.2 -9 682.70 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 12 24 329 8.1 -9 682.70 -39.3 -39.4 -39.4 72 -99 SPO 1997 04 07 12 25 330 8.0 -9 682.70 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 12 26 329 8.3 -9 682.70 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 12 27 331 7.9 -9 682.70 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 12 28 329 8.1 -9 682.70 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 12 29 330 7.7 -9 682.70 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 12 30 333 8.0 -9 682.70 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 12 31 335 8.2 -9 682.70 -39.4 -39.5 -39.4 72 -99 SPO 1997 04 07 12 32 335 8.1 -9 682.70 -39.4 -39.5 -39.4 72 -99 SPO 1997 04 07 12 33 334 7.6 -9 682.70 -39.4 -39.5 -39.4 72 -99 SPO 1997 04 07 12 34 327 7.2 -9 682.70 -39.3 -39.5 -39.4 71 -99 SPO 1997 04 07 12 35 329 7.4 -9 682.70 -39.3 -39.5 -39.4 71 -99 SPO 1997 04 07 12 36 327 7.7 -9 682.70 -39.3 -39.5 -39.4 71 -99 SPO 1997 04 07 12 37 327 7.7 -9 682.70 -39.4 -39.5 -39.4 72 -99 SPO 1997 04 07 12 38 330 7.3 -9 682.70 -39.4 -39.5 -39.4 72 -99 SPO 1997 04 07 12 39 331 7.2 -9 682.80 -39.4 -39.5 -39.5 72 -99 SPO 1997 04 07 12 40 332 7.7 -9 682.80 -39.4 -39.5 -39.5 72 -99 SPO 1997 04 07 12 41 333 7.8 -9 682.70 -39.4 -39.5 -39.5 72 -99 SPO 1997 04 07 12 42 333 7.6 -9 682.70 -39.4 -39.5 -39.5 72 -99 SPO 1997 04 07 12 43 331 7.6 -9 682.70 -39.4 -39.5 -39.5 72 -99 SPO 1997 04 07 12 44 329 8.2 -9 682.70 -39.4 -39.6 -39.5 72 -99 SPO 1997 04 07 12 45 328 8.4 -9 682.70 -39.4 -39.7 -39.6 72 -99 SPO 1997 04 07 12 46 327 8.0 -9 682.70 -39.5 -39.7 -39.6 72 -99 SPO 1997 04 07 12 47 328 7.5 -9 682.70 -39.5 -39.7 -39.6 72 -99 SPO 1997 04 07 12 48 328 8.2 -9 682.70 -39.5 -39.7 -39.6 71 -99 SPO 1997 04 07 12 49 328 8.2 -9 682.60 -39.5 -39.8 -39.6 71 -99 SPO 1997 04 07 12 50 327 8.4 -9 682.60 -39.5 -39.8 -39.6 71 -99 SPO 1997 04 07 12 51 327 8.2 -9 682.60 -39.5 -39.8 -39.6 72 -99 SPO 1997 04 07 12 52 327 8.4 -9 682.60 -39.5 -39.8 -39.6 72 -99 SPO 1997 04 07 12 53 327 8.5 -9 682.60 -39.6 -39.8 -39.6 73 -99 SPO 1997 04 07 12 54 325 8.6 -9 682.60 -39.6 -39.8 -39.6 73 -99 SPO 1997 04 07 12 55 325 8.2 -9 682.60 -39.6 -39.8 -39.6 72 -99 SPO 1997 04 07 12 56 327 8.3 -9 682.60 -39.6 -39.8 -39.6 73 -99 SPO 1997 04 07 12 57 328 8.4 -9 682.60 -39.6 -39.8 -39.6 72 -99 SPO 1997 04 07 12 58 329 8.5 -9 682.60 -39.5 -39.8 -39.6 71 -99 SPO 1997 04 07 12 59 329 8.4 -9 682.50 -39.6 -39.7 -39.6 72 -99 SPO 1997 04 07 13 00 329 8.5 -9 682.60 -39.6 -39.7 -39.6 72 0 SPO 1997 04 07 13 01 329 8.8 -9 682.60 -39.6 -39.7 -39.6 72 -99 SPO 1997 04 07 13 02 330 8.4 -9 682.50 -39.6 -39.7 -39.6 72 -99 SPO 1997 04 07 13 03 331 8.8 -9 682.50 -39.6 -39.7 -39.6 72 -99 SPO 1997 04 07 13 04 332 8.8 -9 682.50 -39.6 -39.7 -39.7 72 -99 SPO 1997 04 07 13 05 332 8.3 -9 682.50 -39.6 -39.7 -39.7 72 -99 SPO 1997 04 07 13 06 330 8.3 -9 682.50 -39.6 -39.7 -39.7 72 -99 SPO 1997 04 07 13 07 330 8.3 -9 682.50 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 13 08 332 8.2 -9 682.50 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 13 09 335 8.5 -9 682.50 -39.6 -39.9 -39.7 72 -99 SPO 1997 04 07 13 10 333 8.5 -9 682.50 -39.6 -39.9 -39.8 72 -99 SPO 1997 04 07 13 11 329 8.4 -9 682.50 -39.7 -39.9 -39.8 73 -99 SPO 1997 04 07 13 12 331 8.8 -9 682.50 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 13 13 327 8.9 -9 682.40 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 13 14 327 9.1 -9 682.40 -39.8 -40.0 -39.9 72 -99 SPO 1997 04 07 13 15 327 8.9 -9 682.40 -39.8 -40.0 -39.9 72 -99 SPO 1997 04 07 13 16 328 9.4 -9 682.30 -39.8 -40.0 -40.0 72 -99 SPO 1997 04 07 13 17 327 9.0 -9 682.30 -39.9 -40.0 -40.0 71 -99 SPO 1997 04 07 13 18 329 9.1 -9 682.20 -39.9 -40.0 -40.0 71 -99 SPO 1997 04 07 13 19 327 8.9 -9 682.20 -39.9 -40.0 -40.0 71 -99 SPO 1997 04 07 13 20 325 8.6 -9 682.20 -39.9 -40.0 -40.0 71 -99 SPO 1997 04 07 13 21 325 8.7 -9 682.20 -40.0 -40.0 -40.0 71 -99 SPO 1997 04 07 13 22 326 8.8 -9 682.20 -40.0 -40.0 -40.1 71 -99 SPO 1997 04 07 13 23 326 8.8 -9 682.20 -40.0 -40.0 -40.1 71 -99 SPO 1997 04 07 13 24 326 9.0 -9 682.20 -40.0 -40.0 -40.1 71 -99 SPO 1997 04 07 13 25 328 8.4 -9 682.20 -40.0 -40.0 -40.1 71 -99 SPO 1997 04 07 13 26 330 8.2 -9 682.20 -40.1 -40.0 -40.2 71 -99 SPO 1997 04 07 13 27 329 8.4 -9 682.20 -40.1 -40.0 -40.2 71 -99 SPO 1997 04 07 13 28 330 8.0 -9 682.20 -40.1 -40.0 -40.2 71 -99 SPO 1997 04 07 13 29 329 7.8 -9 682.20 -40.2 -40.1 -40.2 71 -99 SPO 1997 04 07 13 30 329 7.7 -9 682.20 -40.2 -40.1 -40.3 71 -99 SPO 1997 04 07 13 31 328 8.6 -9 682.20 -40.2 -40.2 -40.3 71 -99 SPO 1997 04 07 13 32 326 8.6 -9 682.20 -40.2 -40.3 -40.3 71 -99 SPO 1997 04 07 13 33 327 8.3 -9 682.20 -40.2 -40.3 -40.3 71 -99 SPO 1997 04 07 13 34 328 8.0 -9 682.20 -40.3 -40.4 -40.4 72 -99 SPO 1997 04 07 13 35 331 7.8 -9 682.20 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 13 36 331 8.0 -9 682.20 -40.3 -40.3 -40.3 71 -99 SPO 1997 04 07 13 37 331 7.7 -9 682.20 -40.3 -40.4 -40.3 71 -99 SPO 1997 04 07 13 38 333 7.6 -9 682.10 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 13 39 333 8.0 -9 682.10 -40.3 -40.4 -40.4 72 -99 SPO 1997 04 07 13 40 331 8.1 -9 682.10 -40.3 -40.4 -40.4 72 -99 SPO 1997 04 07 13 41 330 8.1 -9 682.10 -40.4 -40.5 -40.4 72 -99 SPO 1997 04 07 13 42 328 8.5 -9 682.10 -40.4 -40.5 -40.4 72 -99 SPO 1997 04 07 13 43 328 8.1 -9 682.10 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 13 44 327 8.4 -9 682.10 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 13 45 328 8.3 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 13 46 329 8.3 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 13 47 328 8.4 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 13 48 329 8.2 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 13 49 330 8.6 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 13 50 330 8.4 -9 682.00 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 13 51 330 8.1 -9 681.90 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 13 52 329 8.5 -9 681.90 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 13 53 328 8.2 -9 681.90 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 13 54 326 8.8 -9 681.90 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 13 55 329 8.7 -9 681.90 -40.3 -40.6 -40.4 72 -99 SPO 1997 04 07 13 56 327 8.4 -9 681.90 -40.3 -40.6 -40.4 72 -99 SPO 1997 04 07 13 57 324 8.0 -9 681.90 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 13 58 329 8.1 -9 681.90 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 13 59 327 7.9 -9 681.90 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 14 00 324 8.3 -9 681.90 -40.3 -40.6 -40.4 71 0 SPO 1997 04 07 14 01 326 8.5 -9 681.90 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 14 02 328 9.1 -9 681.80 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 14 03 326 9.0 -9 681.80 -40.4 -40.6 -40.4 72 -99 SPO 1997 04 07 14 04 325 8.9 -9 681.90 -40.4 -40.6 -40.4 72 -99 SPO 1997 04 07 14 05 326 8.2 -9 681.90 -40.4 -40.5 -40.4 73 -99 SPO 1997 04 07 14 06 330 8.2 -9 681.90 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 14 07 327 8.5 -9 681.90 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 14 08 325 8.8 -9 681.90 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 14 09 328 8.4 -9 681.90 -40.4 -40.5 -40.5 72 -99 SPO 1997 04 07 14 10 328 8.3 -9 681.90 -40.4 -40.5 -40.4 72 -99 SPO 1997 04 07 14 11 327 8.5 -9 681.90 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 14 12 327 8.3 -9 681.90 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 14 13 328 8.6 -9 681.90 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 14 14 327 8.9 -9 681.90 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 14 15 326 8.8 -9 681.90 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 14 16 327 8.9 -9 681.90 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 14 17 327 9.1 -9 681.80 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 14 18 327 9.0 -9 681.80 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 14 19 326 8.3 -9 681.80 -40.3 -40.6 -40.4 72 -99 SPO 1997 04 07 14 20 328 8.7 -9 681.80 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 14 21 330 9.1 -9 681.80 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 14 22 328 8.5 -9 681.80 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 14 23 327 8.9 -9 681.80 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 14 24 328 8.9 -9 681.80 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 14 25 328 8.7 -9 681.80 -40.4 -40.7 -40.5 71 -99 SPO 1997 04 07 14 26 328 9.0 -9 681.80 -40.4 -40.7 -40.6 71 -99 SPO 1997 04 07 14 27 326 9.0 -9 681.80 -40.5 -40.7 -40.6 72 -99 SPO 1997 04 07 14 28 325 9.2 -9 681.80 -40.5 -40.6 -40.5 72 -99 SPO 1997 04 07 14 29 325 9.3 -9 681.80 -40.5 -40.6 -40.5 73 -99 SPO 1997 04 07 14 30 321 9.3 -9 681.80 -40.4 -40.5 -40.5 72 -99 SPO 1997 04 07 14 31 323 9.6 -9 681.80 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 14 32 323 9.0 -9 681.80 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 14 33 320 9.0 -9 681.80 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 14 34 321 8.8 -9 681.80 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 14 35 325 9.3 -9 681.80 -40.5 -40.6 -40.5 72 -99 SPO 1997 04 07 14 36 322 9.0 -9 681.80 -40.5 -40.6 -40.6 72 -99 SPO 1997 04 07 14 37 323 8.8 -9 681.80 -40.5 -40.6 -40.6 72 -99 SPO 1997 04 07 14 38 326 8.9 -9 681.80 -40.5 -40.6 -40.6 70 -99 SPO 1997 04 07 14 39 323 8.9 -9 681.80 -40.5 -40.6 -40.6 69 -99 SPO 1997 04 07 14 40 323 8.8 -9 681.80 -40.5 -40.6 -40.6 68 -99 SPO 1997 04 07 14 41 324 8.4 -9 681.80 -40.5 -40.7 -40.6 69 -99 SPO 1997 04 07 14 42 323 8.6 -9 681.80 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 14 43 322 8.7 -9 681.70 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 14 44 322 8.8 -9 681.70 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 14 45 321 8.9 -9 681.70 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 14 46 319 9.2 -9 681.70 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 14 47 320 9.0 -9 681.70 -40.5 -40.7 -40.6 72 -99 SPO 1997 04 07 14 48 321 9.0 -9 681.70 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 14 49 319 8.8 -9 681.80 -40.5 -40.7 -40.6 72 -99 SPO 1997 04 07 14 50 318 9.0 -9 681.70 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 14 51 318 8.6 -9 681.80 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 14 52 319 9.0 -9 681.80 -40.5 -40.7 -40.6 69 -99 SPO 1997 04 07 14 53 320 8.5 -9 681.80 -40.5 -40.6 -40.5 69 -99 SPO 1997 04 07 14 54 319 8.5 -9 681.80 -40.5 -40.6 -40.6 69 -99 SPO 1997 04 07 14 55 323 8.2 -9 681.80 -40.5 -40.7 -40.6 69 -99 SPO 1997 04 07 14 56 323 8.6 -9 681.80 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 14 57 323 8.5 -9 681.80 -40.5 -40.6 -40.6 70 -99 SPO 1997 04 07 14 58 322 8.3 -9 681.80 -40.5 -40.6 -40.6 71 -99 SPO 1997 04 07 14 59 322 8.5 -9 681.80 -40.5 -40.6 -40.6 72 -99 SPO 1997 04 07 15 00 323 8.7 -9 681.80 -40.5 -40.6 -40.6 72 0 SPO 1997 04 07 15 01 323 8.7 -9 681.80 -40.5 -40.6 -40.6 71 -99 SPO 1997 04 07 15 02 322 8.9 -9 681.80 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 15 03 321 8.5 -9 681.70 -40.6 -40.7 -40.6 71 -99 SPO 1997 04 07 15 04 320 8.3 -9 681.70 -40.6 -40.8 -40.6 72 -99 SPO 1997 04 07 15 05 320 8.7 -9 681.70 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 15 06 321 8.8 -9 681.70 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 15 07 320 8.7 -9 681.70 -40.6 -40.8 -40.6 70 -99 SPO 1997 04 07 15 08 320 8.3 -9 681.70 -40.6 -40.8 -40.6 70 -99 SPO 1997 04 07 15 09 319 8.4 -9 681.70 -40.5 -40.8 -40.6 70 -99 SPO 1997 04 07 15 10 318 8.7 -9 681.70 -40.5 -40.8 -40.6 71 -99 SPO 1997 04 07 15 11 319 8.5 -9 681.70 -40.6 -40.8 -40.6 72 -99 SPO 1997 04 07 15 12 319 8.4 -9 681.70 -40.6 -40.8 -40.6 72 -99 SPO 1997 04 07 15 13 319 8.6 -9 681.70 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 15 14 320 8.4 -9 681.70 -40.5 -40.8 -40.6 70 -99 SPO 1997 04 07 15 15 321 8.2 -9 681.70 -40.5 -40.8 -40.6 71 -99 SPO 1997 04 07 15 16 320 8.8 -9 681.70 -40.5 -40.7 -40.5 71 -99 SPO 1997 04 07 15 17 322 8.6 -9 681.70 -40.5 -40.6 -40.5 72 -99 SPO 1997 04 07 15 18 323 7.8 -9 681.70 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 15 19 324 7.5 -9 681.80 -40.5 -40.7 -40.5 71 -99 SPO 1997 04 07 15 20 324 8.0 -9 681.80 -40.4 -40.6 -40.5 69 -99 SPO 1997 04 07 15 21 324 7.5 -9 681.80 -40.4 -40.6 -40.5 69 -99 SPO 1997 04 07 15 22 327 7.3 -9 681.80 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 15 23 324 7.7 -9 681.80 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 15 24 325 8.1 -9 681.80 -40.5 -40.6 -40.6 72 -99 SPO 1997 04 07 15 25 322 8.1 -9 681.80 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 15 26 323 7.8 -9 681.80 -40.5 -40.8 -40.6 72 -99 SPO 1997 04 07 15 27 324 7.7 -9 681.80 -40.5 -40.8 -40.6 72 -99 SPO 1997 04 07 15 28 322 7.9 -9 681.80 -40.5 -40.8 -40.6 72 -99 SPO 1997 04 07 15 29 324 8.1 -9 681.80 -40.5 -40.8 -40.6 71 -99 SPO 1997 04 07 15 30 322 7.8 -9 681.80 -40.5 -40.8 -40.6 71 -99 SPO 1997 04 07 15 31 324 7.8 -9 681.80 -40.5 -40.8 -40.6 70 -99 SPO 1997 04 07 15 32 323 8.2 -9 681.80 -40.6 -40.8 -40.6 72 -99 SPO 1997 04 07 15 33 323 8.0 -9 681.80 -40.6 -40.9 -40.7 71 -99 SPO 1997 04 07 15 34 322 7.9 -9 681.80 -40.6 -40.9 -40.7 70 -99 SPO 1997 04 07 15 35 322 7.7 -9 681.80 -40.6 -40.8 -40.6 70 -99 SPO 1997 04 07 15 36 321 8.1 -9 681.80 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 15 37 321 8.1 -9 681.80 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 15 38 321 7.5 -9 681.80 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 15 39 320 7.9 -9 681.80 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 15 40 320 7.5 -9 681.80 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 15 41 321 7.6 -9 681.80 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 15 42 320 7.8 -9 681.80 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 15 43 321 7.3 -9 681.80 -40.5 -40.7 -40.6 72 -99 SPO 1997 04 07 15 44 320 7.3 -9 681.80 -40.5 -40.6 -40.6 71 -99 SPO 1997 04 07 15 45 320 7.1 -9 681.80 -40.5 -40.6 -40.5 71 -99 SPO 1997 04 07 15 46 319 7.2 -9 681.80 -40.5 -40.6 -40.5 71 -99 SPO 1997 04 07 15 47 321 7.2 -9 681.80 -40.4 -40.6 -40.5 69 -99 SPO 1997 04 07 15 48 320 7.2 -9 681.90 -40.4 -40.6 -40.5 69 -99 SPO 1997 04 07 15 49 319 6.8 -9 681.90 -40.5 -40.7 -40.5 70 -99 SPO 1997 04 07 15 50 319 6.6 -9 681.90 -40.5 -40.7 -40.5 70 -99 SPO 1997 04 07 15 51 319 6.6 -9 681.90 -40.5 -40.7 -40.5 71 -99 SPO 1997 04 07 15 52 319 6.2 -9 681.90 -40.4 -40.7 -40.5 71 -99 SPO 1997 04 07 15 53 318 6.3 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 15 54 318 5.9 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 15 55 318 5.7 -9 682.00 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 15 56 319 5.9 -9 682.00 -40.4 -40.6 -40.4 71 -99 SPO 1997 04 07 15 57 319 5.7 -9 682.00 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 15 58 319 5.5 -9 682.00 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 15 59 319 5.7 -9 682.00 -40.4 -40.6 -40.4 72 -99 SPO 1997 04 07 16 00 319 6.0 -9 682.00 -40.4 -40.6 -40.4 72 0 SPO 1997 04 07 16 01 319 5.5 -9 682.00 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 16 02 322 5.3 -9 682.10 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 16 03 320 5.5 -9 682.10 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 04 320 5.8 -9 682.10 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 05 321 5.7 -9 682.10 -40.4 -40.6 -40.4 71 -99 SPO 1997 04 07 16 06 320 5.3 -9 682.10 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 07 319 5.4 -9 682.10 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 16 08 317 5.4 -9 682.10 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 09 316 5.5 -9 682.00 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 10 314 5.8 -9 682.00 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 11 315 5.9 -9 682.00 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 16 12 317 5.8 -9 681.90 -40.4 -40.5 -40.4 71 -99 SPO 1997 04 07 16 13 317 6.2 -9 681.90 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 16 14 316 6.3 -9 681.90 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 16 15 316 6.0 -9 681.90 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 16 16 317 6.5 -9 681.90 -40.5 -40.6 -40.5 71 -99 SPO 1997 04 07 16 17 317 6.0 -9 681.90 -40.5 -40.6 -40.5 70 -99 SPO 1997 04 07 16 18 317 6.3 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 19 317 6.5 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 20 318 6.2 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 21 317 6.2 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 22 316 6.2 -9 681.90 -40.5 -40.6 -40.6 71 -99 SPO 1997 04 07 16 23 317 6.0 -9 682.00 -40.5 -40.6 -40.5 71 -99 SPO 1997 04 07 16 24 316 5.9 -9 682.00 -40.5 -40.6 -40.5 71 -99 SPO 1997 04 07 16 25 315 6.0 -9 682.00 -40.5 -40.5 -40.5 71 -99 SPO 1997 04 07 16 26 316 6.0 -9 682.00 -40.5 -40.5 -40.5 71 -99 SPO 1997 04 07 16 27 316 5.8 -9 682.00 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 28 317 5.8 -9 682.00 -40.4 -40.5 -40.5 71 -99 SPO 1997 04 07 16 29 315 5.6 -9 682.00 -40.4 -40.4 -40.5 71 -99 SPO 1997 04 07 16 30 317 5.7 -9 682.00 -40.4 -40.4 -40.4 71 -99 SPO 1997 04 07 16 31 317 5.5 -9 682.00 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 16 32 318 5.3 -9 682.00 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 16 33 319 5.1 -9 682.10 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 16 34 322 5.0 -9 682.10 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 16 35 323 4.8 -9 682.10 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 16 36 323 4.7 -9 682.10 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 16 37 327 4.7 -9 682.10 -40.4 -40.6 -40.4 73 -99 SPO 1997 04 07 16 38 329 4.7 -9 682.00 -40.4 -40.6 -40.5 72 -99 SPO 1997 04 07 16 39 328 4.7 -9 682.00 -40.4 -40.7 -40.5 72 -99 SPO 1997 04 07 16 40 327 4.5 -9 682.00 -40.4 -40.7 -40.5 71 -99 SPO 1997 04 07 16 41 325 4.7 -9 682.10 -40.4 -40.7 -40.5 71 -99 SPO 1997 04 07 16 42 324 4.9 -9 682.00 -40.4 -40.7 -40.5 72 -99 SPO 1997 04 07 16 43 324 4.9 -9 682.00 -40.5 -40.7 -40.5 73 -99 SPO 1997 04 07 16 44 324 5.0 -9 682.00 -40.5 -40.6 -40.5 72 -99 SPO 1997 04 07 16 45 325 5.0 -9 682.00 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 46 324 5.2 -9 681.90 -40.5 -40.7 -40.6 70 -99 SPO 1997 04 07 16 47 324 5.2 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 48 323 5.1 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 49 323 5.3 -9 681.90 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 16 50 324 5.3 -9 681.80 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 16 51 325 5.2 -9 681.80 -40.6 -40.7 -40.6 71 -99 SPO 1997 04 07 16 52 325 5.4 -9 681.90 -40.6 -40.7 -40.6 71 -99 SPO 1997 04 07 16 53 325 5.3 -9 681.90 -40.6 -40.6 -40.6 72 -99 SPO 1997 04 07 16 54 327 5.2 -9 681.90 -40.6 -40.6 -40.6 72 -99 SPO 1997 04 07 16 55 327 4.8 -9 681.90 -40.6 -40.6 -40.6 72 -99 SPO 1997 04 07 16 56 328 4.7 -9 681.90 -40.6 -40.6 -40.6 71 -99 SPO 1997 04 07 16 57 329 4.8 -9 682.00 -40.6 -40.6 -40.6 71 -99 SPO 1997 04 07 16 58 329 4.7 -9 682.00 -40.6 -40.6 -40.6 72 -99 SPO 1997 04 07 16 59 328 4.9 -9 682.00 -40.6 -40.6 -40.6 71 -99 SPO 1997 04 07 17 00 328 4.9 -9 682.00 -40.6 -40.7 -40.6 71 0 SPO 1997 04 07 17 01 330 4.8 -9 682.00 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 17 02 331 4.8 -9 682.00 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 17 03 332 4.8 -9 682.00 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 17 04 333 4.8 -9 682.00 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 17 05 334 4.6 -9 682.00 -40.5 -40.7 -40.6 71 -99 SPO 1997 04 07 17 06 333 4.8 -9 682.00 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 17 07 332 4.9 -9 682.00 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 17 08 330 5.2 -9 682.00 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 17 09 330 5.1 -9 681.90 -40.6 -40.7 -40.6 71 -99 SPO 1997 04 07 17 10 329 5.5 -9 681.90 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 17 11 328 5.5 -9 681.90 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 17 12 327 5.8 -9 681.90 -40.6 -40.7 -40.6 72 -99 SPO 1997 04 07 17 13 327 5.9 -9 681.90 -40.6 -40.7 -40.7 71 -99 SPO 1997 04 07 17 14 325 6.2 -9 681.90 -40.6 -40.7 -40.7 71 -99 SPO 1997 04 07 17 15 324 6.4 -9 681.90 -40.6 -40.8 -40.7 71 -99 SPO 1997 04 07 17 16 323 6.5 -9 681.90 -40.6 -40.8 -40.7 71 -99 SPO 1997 04 07 17 17 323 6.4 -9 681.80 -40.6 -40.7 -40.7 71 -99 SPO 1997 04 07 17 18 324 6.5 -9 681.80 -40.6 -40.8 -40.7 71 -99 SPO 1997 04 07 17 19 324 6.5 -9 681.80 -40.6 -40.7 -40.7 70 -99 SPO 1997 04 07 17 20 324 6.6 -9 681.80 -40.6 -40.8 -40.7 70 -99 SPO 1997 04 07 17 21 324 6.3 -9 681.80 -40.6 -40.8 -40.7 71 -99 SPO 1997 04 07 17 22 324 6.2 -9 681.80 -40.6 -40.9 -40.7 72 -99 SPO 1997 04 07 17 23 324 6.1 -9 681.80 -40.6 -40.9 -40.7 72 -99 SPO 1997 04 07 17 24 325 6.2 -9 681.80 -40.6 -40.9 -40.7 72 -99 SPO 1997 04 07 17 25 325 6.3 -9 681.80 -40.6 -40.9 -40.7 71 -99 SPO 1997 04 07 17 26 324 6.2 -9 681.80 -40.6 -40.9 -40.6 71 -99 SPO 1997 04 07 17 27 324 6.2 -9 681.80 -40.6 -40.9 -40.6 71 -99 SPO 1997 04 07 17 28 325 5.9 -9 681.80 -40.6 -40.9 -40.7 71 -99 SPO 1997 04 07 17 29 325 5.9 -9 681.80 -40.6 -40.9 -40.6 70 -99 SPO 1997 04 07 17 30 325 5.9 -9 681.80 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 17 31 325 5.6 -9 681.80 -40.6 -40.8 -40.6 71 -99 SPO 1997 04 07 17 32 323 5.7 -9 681.80 -40.6 -40.8 -40.6 72 -99 SPO 1997 04 07 17 33 322 5.8 -9 681.80 -40.5 -40.8 -40.6 72 -99 SPO 1997 04 07 17 34 323 6.0 -9 681.80 -40.5 -40.8 -40.6 72 -99 SPO 1997 04 07 17 35 324 6.0 -9 681.70 -40.5 -40.8 -40.5 72 -99 SPO 1997 04 07 17 36 323 6.1 -9 681.70 -40.5 -40.7 -40.5 72 -99 SPO 1997 04 07 17 37 324 5.8 -9 681.70 -40.5 -40.7 -40.5 72 -99 SPO 1997 04 07 17 38 321 5.7 -9 681.70 -40.4 -40.7 -40.5 71 -99 SPO 1997 04 07 17 39 320 5.9 -9 681.70 -40.4 -40.7 -40.5 71 -99 SPO 1997 04 07 17 40 320 6.0 -9 681.70 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 17 41 319 6.1 -9 681.70 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 17 42 317 6.5 -9 681.70 -40.4 -40.6 -40.5 71 -99 SPO 1997 04 07 17 43 316 6.4 -9 681.70 -40.4 -40.6 -40.4 71 -99 SPO 1997 04 07 17 44 317 6.6 -9 681.60 -40.4 -40.6 -40.4 71 -99 SPO 1997 04 07 17 45 318 6.8 -9 681.60 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 17 46 316 6.8 -9 681.60 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 17 47 314 6.9 -9 681.60 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 17 48 313 6.8 -9 681.60 -40.3 -40.6 -40.4 71 -99 SPO 1997 04 07 17 49 313 7.0 -9 681.60 -40.3 -40.6 -40.4 72 -99 SPO 1997 04 07 17 50 313 7.0 -9 681.60 -40.3 -40.6 -40.3 72 -99 SPO 1997 04 07 17 51 314 6.7 -9 681.60 -40.3 -40.5 -40.4 72 -99 SPO 1997 04 07 17 52 313 7.1 -9 681.60 -40.3 -40.5 -40.4 72 -99 SPO 1997 04 07 17 53 312 7.1 -9 681.60 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 17 54 310 6.9 -9 681.60 -40.3 -40.5 -40.4 71 -99 SPO 1997 04 07 17 55 311 6.7 -9 681.60 -40.3 -40.5 -40.3 71 -99 SPO 1997 04 07 17 56 312 7.2 -9 681.50 -40.3 -40.5 -40.3 71 -99 SPO 1997 04 07 17 57 312 6.8 -9 681.60 -40.3 -40.5 -40.3 71 -99 SPO 1997 04 07 17 58 313 6.8 -9 681.60 -40.3 -40.5 -40.3 71 -99 SPO 1997 04 07 17 59 313 6.8 -9 681.60 -40.3 -40.4 -40.3 71 -99 SPO 1997 04 07 18 00 315 7.0 -9 681.60 -40.3 -40.5 -40.4 71 0 SPO 1997 04 07 18 01 316 7.1 -9 681.60 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 18 02 314 7.0 -9 681.60 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 18 03 313 7.2 -9 681.60 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 18 04 312 6.7 -9 681.60 -40.3 -40.4 -40.4 71 -99 SPO 1997 04 07 18 05 314 6.6 -9 681.60 -40.3 -40.4 -40.3 71 -99 SPO 1997 04 07 18 06 314 6.6 -9 681.60 -40.3 -40.4 -40.3 71 -99 SPO 1997 04 07 18 07 313 7.0 -9 681.60 -40.3 -40.4 -40.3 72 -99 SPO 1997 04 07 18 08 313 6.7 -9 681.60 -40.2 -40.4 -40.3 71 -99 SPO 1997 04 07 18 09 314 6.7 -9 681.50 -40.2 -40.4 -40.3 71 -99 SPO 1997 04 07 18 10 315 6.3 -9 681.50 -40.2 -40.4 -40.3 71 -99 SPO 1997 04 07 18 11 316 6.5 -9 681.50 -40.2 -40.4 -40.3 71 -99 SPO 1997 04 07 18 12 315 6.1 -9 681.50 -40.2 -40.4 -40.3 71 -99 SPO 1997 04 07 18 13 316 6.2 -9 681.50 -40.2 -40.4 -40.3 71 -99 SPO 1997 04 07 18 14 315 6.3 -9 681.50 -40.2 -40.3 -40.3 71 -99 SPO 1997 04 07 18 15 316 6.3 -9 681.50 -40.2 -40.3 -40.3 71 -99 SPO 1997 04 07 18 16 317 6.4 -9 681.50 -40.2 -40.3 -40.2 71 -99 SPO 1997 04 07 18 17 317 6.3 -9 681.50 -40.2 -40.3 -40.2 71 -99 SPO 1997 04 07 18 18 317 6.3 -9 681.50 -40.2 -40.3 -40.2 71 -99 SPO 1997 04 07 18 19 318 6.0 -9 681.50 -40.2 -40.2 -40.2 72 -99 SPO 1997 04 07 18 20 319 5.9 -9 681.50 -40.2 -40.3 -40.2 71 -99 SPO 1997 04 07 18 21 319 6.1 -9 681.50 -40.1 -40.3 -40.2 71 -99 SPO 1997 04 07 18 22 319 6.2 -9 681.50 -40.1 -40.2 -40.2 71 -99 SPO 1997 04 07 18 23 320 6.5 -9 681.40 -40.1 -40.2 -40.2 71 -99 SPO 1997 04 07 18 24 320 6.5 -9 681.40 -40.1 -40.2 -40.2 71 -99 SPO 1997 04 07 18 25 319 6.5 -9 681.40 -40.1 -40.2 -40.1 71 -99 SPO 1997 04 07 18 26 319 6.2 -9 681.40 -40.1 -40.2 -40.1 71 -99 SPO 1997 04 07 18 27 319 6.0 -9 681.40 -40.1 -40.2 -40.1 71 -99 SPO 1997 04 07 18 28 321 6.3 -9 681.40 -40.0 -40.2 -40.1 71 -99 SPO 1997 04 07 18 29 322 6.1 -9 681.40 -40.0 -40.2 -40.1 71 -99 SPO 1997 04 07 18 30 322 6.1 -9 681.40 -40.0 -40.2 -40.0 71 -99 SPO 1997 04 07 18 31 321 6.2 -9 681.40 -40.0 -40.2 -40.0 72 -99 SPO 1997 04 07 18 32 321 6.3 -9 681.40 -39.9 -40.2 -40.0 71 -99 SPO 1997 04 07 18 33 320 6.2 -9 681.40 -39.9 -40.2 -40.0 72 -99 SPO 1997 04 07 18 34 321 5.9 -9 681.40 -39.9 -40.2 -39.9 71 -99 SPO 1997 04 07 18 35 318 6.4 -9 681.40 -39.8 -40.2 -39.9 72 -99 SPO 1997 04 07 18 36 318 6.4 -9 681.40 -39.8 -40.1 -39.9 72 -99 SPO 1997 04 07 18 37 317 6.5 -9 681.40 -39.8 -40.1 -39.9 72 -99 SPO 1997 04 07 18 38 318 6.2 -9 681.40 -39.8 -40.1 -39.8 70 -99 SPO 1997 04 07 18 39 318 5.9 -9 681.40 -39.8 -40.1 -39.8 69 -99 SPO 1997 04 07 18 40 317 6.0 -9 681.40 -39.8 -40.0 -39.8 70 -99 SPO 1997 04 07 18 41 314 6.6 -9 681.40 -39.7 -40.0 -39.8 70 -99 SPO 1997 04 07 18 42 313 6.6 -9 681.40 -39.7 -40.0 -39.8 71 -99 SPO 1997 04 07 18 43 315 5.8 -9 681.40 -39.7 -40.0 -39.8 72 -99 SPO 1997 04 07 18 44 316 5.9 -9 681.40 -39.7 -40.0 -39.8 72 -99 SPO 1997 04 07 18 45 317 5.4 -9 681.40 -39.7 -40.0 -39.8 72 -99 SPO 1997 04 07 18 46 318 5.4 -9 681.40 -39.7 -39.9 -39.7 71 -99 SPO 1997 04 07 18 47 319 5.3 -9 681.40 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 18 48 320 5.3 -9 681.40 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 18 49 318 5.3 -9 681.50 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 18 50 318 5.3 -9 681.50 -39.7 -39.9 -39.7 72 -99 SPO 1997 04 07 18 51 317 5.6 -9 681.50 -39.7 -39.9 -39.7 72 -99 SPO 1997 04 07 18 52 315 5.9 -9 681.40 -39.6 -39.9 -39.7 72 -99 SPO 1997 04 07 18 53 313 5.7 -9 681.40 -39.6 -39.9 -39.7 71 -99 SPO 1997 04 07 18 54 314 5.7 -9 681.40 -39.6 -39.9 -39.7 71 -99 SPO 1997 04 07 18 55 314 5.8 -9 681.40 -39.6 -40.0 -39.7 70 -99 SPO 1997 04 07 18 56 313 6.0 -9 681.40 -39.6 -40.0 -39.7 71 -99 SPO 1997 04 07 18 57 311 5.9 -9 681.40 -39.6 -40.0 -39.7 71 -99 SPO 1997 04 07 18 58 314 5.5 -9 681.40 -39.6 -40.0 -39.7 71 -99 SPO 1997 04 07 18 59 311 5.7 -9 681.40 -39.6 -40.0 -39.7 71 -99 SPO 1997 04 07 19 00 309 5.8 -9 681.40 -39.6 -40.0 -39.7 71 0 SPO 1997 04 07 19 01 310 5.3 -9 681.40 -39.7 -40.0 -39.7 72 -99 SPO 1997 04 07 19 02 309 5.9 -9 681.40 -39.7 -40.0 -39.8 72 -99 SPO 1997 04 07 19 03 310 5.5 -9 681.40 -39.7 -40.0 -39.8 72 -99 SPO 1997 04 07 19 04 310 5.7 -9 681.30 -39.7 -40.0 -39.8 72 -99 SPO 1997 04 07 19 05 310 5.9 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 06 310 6.2 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 07 310 5.8 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 08 310 5.9 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 09 312 6.0 -9 681.30 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 19 10 314 5.7 -9 681.30 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 19 11 314 5.9 -9 681.30 -39.7 -39.9 -39.8 70 -99 SPO 1997 04 07 19 12 314 5.5 -9 681.40 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 19 13 314 5.4 -9 681.40 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 14 314 5.3 -9 681.40 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 15 315 5.4 -9 681.40 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 19 16 317 5.1 -9 681.40 -39.7 -39.8 -39.7 72 -99 SPO 1997 04 07 19 17 317 5.1 -9 681.40 -39.7 -39.8 -39.7 72 -99 SPO 1997 04 07 19 18 318 5.2 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 19 318 5.1 -9 681.40 -39.6 -39.9 -39.7 72 -99 SPO 1997 04 07 19 20 317 5.3 -9 681.40 -39.6 -39.9 -39.7 72 -99 SPO 1997 04 07 19 21 317 5.1 -9 681.40 -39.6 -39.9 -39.7 72 -99 SPO 1997 04 07 19 22 316 5.3 -9 681.40 -39.6 -39.9 -39.7 71 -99 SPO 1997 04 07 19 23 313 5.4 -9 681.40 -39.6 -39.8 -39.7 71 -99 SPO 1997 04 07 19 24 312 5.4 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 25 311 5.7 -9 681.40 -39.6 -39.8 -39.7 71 -99 SPO 1997 04 07 19 26 312 5.6 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 27 314 5.6 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 28 314 5.6 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 29 313 5.7 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 30 311 5.8 -9 681.40 -39.6 -39.8 -39.6 72 -99 SPO 1997 04 07 19 31 310 5.7 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 32 310 5.8 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 33 310 6.0 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 34 312 5.7 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 35 312 5.6 -9 681.40 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 19 36 312 5.8 -9 681.40 -39.7 -39.8 -39.7 72 -99 SPO 1997 04 07 19 37 311 5.7 -9 681.40 -39.7 -39.8 -39.7 72 -99 SPO 1997 04 07 19 38 310 5.6 -9 681.40 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 19 39 310 5.7 -9 681.40 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 19 40 310 5.6 -9 681.40 -39.7 -39.8 -39.8 71 -99 SPO 1997 04 07 19 41 312 5.6 -9 681.40 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 19 42 312 5.8 -9 681.40 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 43 310 6.0 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 44 309 5.7 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 45 311 5.8 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 46 309 5.9 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 47 308 5.8 -9 681.30 -39.7 -39.9 -39.8 71 -99 SPO 1997 04 07 19 48 308 5.7 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 49 310 5.5 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 50 311 5.8 -9 681.30 -39.7 -39.9 -39.8 72 -99 SPO 1997 04 07 19 51 311 5.5 -9 681.30 -39.8 -39.9 -39.8 72 -99 SPO 1997 04 07 19 52 311 5.5 -9 681.30 -39.8 -39.9 -39.8 72 -99 SPO 1997 04 07 19 53 310 5.5 -9 681.30 -39.8 -39.9 -39.8 72 -99 SPO 1997 04 07 19 54 310 5.2 -9 681.30 -39.8 -39.9 -39.8 72 -99 SPO 1997 04 07 19 55 312 5.3 -9 681.30 -39.8 -39.9 -39.8 72 -99 SPO 1997 04 07 19 56 312 5.0 -9 681.30 -39.8 -39.8 -39.8 72 -99 SPO 1997 04 07 19 57 312 5.2 -9 681.30 -39.8 -39.8 -39.8 72 -99 SPO 1997 04 07 19 58 314 5.2 -9 681.30 -39.8 -39.8 -39.8 72 -99 SPO 1997 04 07 19 59 316 5.1 -9 681.30 -39.8 -39.8 -39.8 72 -99 SPO 1997 04 07 20 00 317 4.9 -9 681.30 -39.8 -39.8 -39.8 72 0 SPO 1997 04 07 20 01 318 4.9 -9 681.30 -39.8 -39.8 -39.8 72 -99 SPO 1997 04 07 20 02 321 4.6 -9 681.30 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 20 03 320 4.8 -9 681.30 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 20 04 321 4.6 -9 681.30 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 20 05 321 4.8 -9 681.30 -39.7 -39.8 -39.8 72 -99 SPO 1997 04 07 20 06 322 4.5 -9 681.30 -39.7 -39.8 -39.7 72 -99 SPO 1997 04 07 20 07 322 4.5 -9 681.30 -39.7 -39.9 -39.7 72 -99 SPO 1997 04 07 20 08 322 4.5 -9 681.30 -39.7 -39.8 -39.7 72 -99 SPO 1997 04 07 20 09 320 4.5 -9 681.30 -39.6 -39.8 -39.7 71 -99 SPO 1997 04 07 20 10 318 4.6 -9 681.30 -39.6 -39.8 -39.7 72 -99 SPO 1997 04 07 20 11 316 4.5 -9 681.30 -39.6 -39.8 -39.6 72 -99 SPO 1997 04 07 20 12 316 4.5 -9 681.30 -39.6 -39.8 -39.6 72 -99 SPO 1997 04 07 20 13 314 5.0 -9 681.30 -39.6 -39.7 -39.6 72 -99 SPO 1997 04 07 20 14 313 5.1 -9 681.30 -39.5 -39.7 -39.6 72 -99 SPO 1997 04 07 20 15 314 5.2 -9 681.30 -39.5 -39.7 -39.5 72 -99 SPO 1997 04 07 20 16 313 5.7 -9 681.30 -39.5 -39.7 -39.5 73 -99 SPO 1997 04 07 20 17 313 5.6 -9 681.30 -39.4 -39.6 -39.5 72 -99 SPO 1997 04 07 20 18 311 5.5 -9 681.30 -39.4 -39.6 -39.5 72 -99 SPO 1997 04 07 20 19 311 5.5 -9 681.30 -39.4 -39.6 -39.4 72 -99 SPO 1997 04 07 20 20 311 5.6 -9 681.30 -39.4 -39.6 -39.4 72 -99 SPO 1997 04 07 20 21 310 5.5 -9 681.30 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 20 22 311 5.3 -9 681.30 -39.3 -39.5 -39.4 72 -99 SPO 1997 04 07 20 23 311 5.4 -9 681.30 -39.3 -39.5 -39.3 72 -99 SPO 1997 04 07 20 24 311 5.3 -9 681.30 -39.2 -39.4 -39.3 71 -99 SPO 1997 04 07 20 25 312 4.9 -9 681.30 -39.2 -39.4 -39.3 71 -99 SPO 1997 04 07 20 26 312 4.9 -9 681.30 -39.2 -39.4 -39.3 72 -99 SPO 1997 04 07 20 27 312 4.8 -9 681.30 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 20 28 313 4.7 -9 681.30 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 20 29 314 4.5 -9 681.40 -39.1 -39.3 -39.2 71 -99 SPO 1997 04 07 20 30 314 4.4 -9 681.40 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 20 31 313 4.4 -9 681.40 -39.1 -39.3 -39.1 72 -99 SPO 1997 04 07 20 32 314 4.2 -9 681.40 -39.1 -39.3 -39.1 72 -99 SPO 1997 04 07 20 33 316 4.3 -9 681.40 -39.0 -39.3 -39.1 72 -99 SPO 1997 04 07 20 34 315 4.3 -9 681.40 -39.0 -39.3 -39.1 72 -99 SPO 1997 04 07 20 35 315 3.9 -9 681.40 -39.0 -39.3 -39.1 72 -99 SPO 1997 04 07 20 36 312 4.1 -9 681.40 -39.0 -39.3 -39.1 72 -99 SPO 1997 04 07 20 37 313 4.3 -9 681.40 -39.0 -39.3 -39.0 72 -99 SPO 1997 04 07 20 38 312 4.5 -9 681.40 -39.0 -39.2 -39.0 74 -99 SPO 1997 04 07 20 39 309 5.1 -9 681.30 -39.0 -39.2 -39.0 74 -99 SPO 1997 04 07 20 40 310 5.3 -9 681.30 -39.0 -39.2 -39.0 72 -99 SPO 1997 04 07 20 41 308 5.2 -9 681.30 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 20 42 308 5.3 -9 681.30 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 20 43 307 5.5 -9 681.30 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 20 44 307 5.3 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 20 45 309 5.4 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 20 46 309 5.3 -9 681.30 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 20 47 309 4.9 -9 681.30 -38.9 -39.1 -39.0 72 -99 SPO 1997 04 07 20 48 311 4.7 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 20 49 311 4.8 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 20 50 309 4.8 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 20 51 309 4.9 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 20 52 312 4.6 -9 681.30 -38.9 -39.0 -39.0 73 -99 SPO 1997 04 07 20 53 313 4.8 -9 681.30 -38.9 -39.1 -39.0 71 -99 SPO 1997 04 07 20 54 312 4.9 -9 681.30 -38.9 -39.1 -39.0 71 -99 SPO 1997 04 07 20 55 313 4.8 -9 681.30 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 20 56 314 4.8 -9 681.30 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 20 57 315 4.9 -9 681.30 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 20 58 316 4.8 -9 681.30 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 20 59 316 4.9 -9 681.30 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 21 00 318 4.6 -9 681.30 -38.9 -39.2 -39.0 72 0 SPO 1997 04 07 21 01 319 4.9 -9 681.30 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 21 02 321 4.7 -9 681.30 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 21 03 321 4.8 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 21 04 322 4.6 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 21 05 321 4.5 -9 681.30 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 21 06 321 4.7 -9 681.30 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 21 07 321 4.7 -9 681.30 -38.9 -39.1 -39.0 71 -99 SPO 1997 04 07 21 08 322 4.6 -9 681.30 -39.0 -39.1 -39.0 71 -99 SPO 1997 04 07 21 09 321 4.6 -9 681.30 -39.0 -39.1 -39.0 71 -99 SPO 1997 04 07 21 10 321 4.8 -9 681.30 -39.0 -39.1 -39.1 71 -99 SPO 1997 04 07 21 11 319 5.0 -9 681.30 -39.0 -39.1 -39.1 71 -99 SPO 1997 04 07 21 12 320 4.8 -9 681.30 -39.0 -39.1 -39.1 71 -99 SPO 1997 04 07 21 13 319 4.8 -9 681.20 -39.1 -39.1 -39.1 72 -99 SPO 1997 04 07 21 14 319 5.0 -9 681.20 -39.1 -39.1 -39.1 72 -99 SPO 1997 04 07 21 15 319 4.7 -9 681.20 -39.1 -39.1 -39.1 72 -99 SPO 1997 04 07 21 16 320 4.7 -9 681.20 -39.1 -39.1 -39.1 72 -99 SPO 1997 04 07 21 17 319 4.7 -9 681.20 -39.1 -39.2 -39.2 71 -99 SPO 1997 04 07 21 18 318 4.9 -9 681.20 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 21 19 319 4.8 -9 681.20 -39.1 -39.2 -39.2 72 -99 SPO 1997 04 07 21 20 319 5.0 -9 681.20 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 21 21 321 4.8 -9 681.20 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 21 22 322 4.9 -9 681.20 -39.2 -39.3 -39.2 71 -99 SPO 1997 04 07 21 23 321 4.9 -9 681.20 -39.2 -39.3 -39.2 71 -99 SPO 1997 04 07 21 24 322 4.9 -9 681.20 -39.2 -39.3 -39.2 71 -99 SPO 1997 04 07 21 25 323 4.8 -9 681.20 -39.1 -39.3 -39.2 71 -99 SPO 1997 04 07 21 26 323 4.7 -9 681.20 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 21 27 323 4.6 -9 681.20 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 21 28 323 5.0 -9 681.30 -39.2 -39.3 -39.2 72 -99 SPO 1997 04 07 21 29 324 4.8 -9 681.30 -39.1 -39.3 -39.2 71 -99 SPO 1997 04 07 21 30 324 4.8 -9 681.20 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 21 31 324 4.6 -9 681.20 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 21 32 323 4.7 -9 681.20 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 21 33 322 4.8 -9 681.20 -39.1 -39.3 -39.2 72 -99 SPO 1997 04 07 21 34 322 5.0 -9 681.20 -39.1 -39.3 -39.1 72 -99 SPO 1997 04 07 21 35 321 4.8 -9 681.20 -39.1 -39.3 -39.1 72 -99 SPO 1997 04 07 21 36 320 5.1 -9 681.20 -39.1 -39.2 -39.1 72 -99 SPO 1997 04 07 21 37 320 5.1 -9 681.20 -39.0 -39.2 -39.1 71 -99 SPO 1997 04 07 21 38 318 5.1 -9 681.20 -39.0 -39.2 -39.1 71 -99 SPO 1997 04 07 21 39 318 5.2 -9 681.20 -39.0 -39.2 -39.1 71 -99 SPO 1997 04 07 21 40 317 5.2 -9 681.20 -39.0 -39.2 -39.1 70 -99 SPO 1997 04 07 21 41 315 5.3 -9 681.20 -39.0 -39.2 -39.0 71 -99 SPO 1997 04 07 21 42 315 5.3 -9 681.20 -39.0 -39.2 -39.0 72 -99 SPO 1997 04 07 21 43 315 5.1 -9 681.20 -39.0 -39.2 -39.0 72 -99 SPO 1997 04 07 21 44 314 5.5 -9 681.20 -39.0 -39.2 -39.0 74 -99 SPO 1997 04 07 21 45 315 5.2 -9 681.20 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 21 46 315 5.1 -9 681.20 -38.9 -39.2 -39.0 71 -99 SPO 1997 04 07 21 47 315 4.9 -9 681.20 -38.9 -39.2 -39.0 71 -99 SPO 1997 04 07 21 48 314 5.1 -9 681.20 -38.9 -39.2 -39.0 72 -99 SPO 1997 04 07 21 49 313 5.3 -9 681.20 -38.9 -39.2 -39.0 73 -99 SPO 1997 04 07 21 50 314 4.9 -9 681.20 -38.9 -39.1 -39.0 73 -99 SPO 1997 04 07 21 51 313 5.0 -9 681.20 -38.9 -39.1 -39.0 74 -99 SPO 1997 04 07 21 52 313 5.2 -9 681.20 -38.9 -39.1 -38.9 73 -99 SPO 1997 04 07 21 53 313 5.2 -9 681.20 -38.9 -39.1 -38.9 72 -99 SPO 1997 04 07 21 54 311 5.2 -9 681.20 -38.8 -39.1 -38.9 72 -99 SPO 1997 04 07 21 55 312 5.2 -9 681.20 -38.8 -39.0 -38.9 71 -99 SPO 1997 04 07 21 56 311 5.3 -9 681.20 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 21 57 311 5.4 -9 681.20 -38.8 -39.0 -38.8 72 -99 SPO 1997 04 07 21 58 310 5.2 -9 681.20 -38.7 -39.0 -38.8 73 -99 SPO 1997 04 07 21 59 310 5.8 -9 681.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 22 00 311 5.7 -9 681.20 -38.7 -38.9 -38.8 73 0 SPO 1997 04 07 22 01 311 5.3 -9 681.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 22 02 308 5.5 -9 681.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 22 03 307 5.6 -9 681.20 -38.7 -38.8 -38.8 73 -99 SPO 1997 04 07 22 04 307 5.9 -9 681.20 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 22 05 307 5.5 -9 681.20 -38.7 -38.8 -38.8 72 -99 SPO 1997 04 07 22 06 306 5.4 -9 681.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 22 07 305 5.6 -9 681.20 -38.7 -38.9 -38.8 73 -99 SPO 1997 04 07 22 08 305 5.8 -9 681.20 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 22 09 306 5.7 -9 681.20 -38.8 -39.0 -38.9 71 -99 SPO 1997 04 07 22 10 306 5.5 -9 681.20 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 22 11 306 5.5 -9 681.20 -38.8 -39.0 -38.9 72 -99 SPO 1997 04 07 22 12 305 5.6 -9 681.20 -38.9 -39.0 -38.9 73 -99 SPO 1997 04 07 22 13 303 5.6 -9 681.20 -38.9 -39.0 -39.0 72 -99 SPO 1997 04 07 22 14 304 5.6 -9 681.20 -38.9 -39.0 -39.0 72 -99 SPO 1997 04 07 22 15 305 5.2 -9 681.10 -39.0 -39.0 -39.0 72 -99 SPO 1997 04 07 22 16 306 5.3 -9 681.10 -39.0 -39.0 -39.1 72 -99 SPO 1997 04 07 22 17 305 5.3 -9 681.10 -39.0 -39.0 -39.1 72 -99 SPO 1997 04 07 22 18 304 5.4 -9 681.10 -39.1 -39.0 -39.1 73 -99 SPO 1997 04 07 22 19 304 5.5 -9 681.10 -39.1 -39.0 -39.1 72 -99 SPO 1997 04 07 22 20 304 5.4 -9 681.10 -39.1 -39.1 -39.2 72 -99 SPO 1997 04 07 22 21 305 5.4 -9 681.10 -39.2 -39.1 -39.2 72 -99 SPO 1997 04 07 22 22 305 5.3 -9 681.10 -39.2 -39.1 -39.3 72 -99 SPO 1997 04 07 22 23 306 5.3 -9 681.10 -39.2 -39.1 -39.3 72 -99 SPO 1997 04 07 22 24 305 5.1 -9 681.10 -39.3 -39.1 -39.3 71 -99 SPO 1997 04 07 22 25 305 5.3 -9 681.10 -39.3 -39.1 -39.4 71 -99 SPO 1997 04 07 22 26 305 5.4 -9 681.10 -39.4 -39.1 -39.4 72 -99 SPO 1997 04 07 22 27 304 5.4 -9 681.10 -39.4 -39.1 -39.4 72 -99 SPO 1997 04 07 22 28 304 5.2 -9 681.10 -39.4 -39.2 -39.5 72 -99 SPO 1997 04 07 22 29 304 5.2 -9 681.10 -39.5 -39.2 -39.5 72 -99 SPO 1997 04 07 22 30 304 5.3 -9 681.10 -39.5 -39.3 -39.6 72 -99 SPO 1997 04 07 22 31 306 5.2 -9 681.10 -39.6 -39.3 -39.6 72 -99 SPO 1997 04 07 22 32 306 5.1 -9 681.10 -39.6 -39.3 -39.6 72 -99 SPO 1997 04 07 22 33 307 5.0 -9 681.10 -39.6 -39.4 -39.7 72 -99 SPO 1997 04 07 22 34 307 5.0 -9 681.10 -39.7 -39.4 -39.7 72 -99 SPO 1997 04 07 22 35 308 4.9 -9 681.10 -39.7 -39.4 -39.8 72 -99 SPO 1997 04 07 22 36 308 5.0 -9 681.10 -39.8 -39.5 -39.8 72 -99 SPO 1997 04 07 22 37 307 5.1 -9 681.10 -39.8 -39.5 -39.9 72 -99 SPO 1997 04 07 22 38 307 5.0 -9 681.10 -39.9 -39.5 -40.0 71 -99 SPO 1997 04 07 22 39 308 5.1 -9 681.10 -39.9 -39.5 -40.0 71 -99 SPO 1997 04 07 22 40 308 5.0 -9 681.10 -40.0 -39.5 -40.0 71 -99 SPO 1997 04 07 22 41 307 5.1 -9 681.10 -40.0 -39.5 -40.1 71 -99 SPO 1997 04 07 22 42 308 5.1 -9 681.10 -40.1 -39.5 -40.1 71 -99 SPO 1997 04 07 22 43 307 5.1 -9 681.10 -40.1 -39.5 -40.1 71 -99 SPO 1997 04 07 22 44 307 5.2 -9 681.10 -40.1 -39.5 -40.2 71 -99 SPO 1997 04 07 22 45 308 5.2 -9 681.10 -40.1 -39.5 -40.2 71 -99 SPO 1997 04 07 22 46 308 5.2 -9 681.10 -40.2 -39.5 -40.2 71 -99 SPO 1997 04 07 22 47 308 5.4 -9 681.10 -40.2 -39.5 -40.2 72 -99 SPO 1997 04 07 22 48 307 5.5 -9 681.10 -40.2 -39.5 -40.2 73 -99 SPO 1997 04 07 22 49 306 5.6 -9 681.10 -40.2 -39.5 -40.2 72 -99 SPO 1997 04 07 22 50 305 5.7 -9 681.10 -40.2 -39.5 -40.2 71 -99 SPO 1997 04 07 22 51 304 6.1 -9 681.10 -40.2 -39.4 -40.2 71 -99 SPO 1997 04 07 22 52 303 6.0 -9 681.10 -40.2 -39.4 -40.2 71 -99 SPO 1997 04 07 22 53 303 6.0 -9 681.10 -40.1 -39.4 -40.1 71 -99 SPO 1997 04 07 22 54 304 6.0 -9 681.10 -40.1 -39.4 -40.2 71 -99 SPO 1997 04 07 22 55 304 5.9 -9 681.10 -40.2 -39.4 -40.2 71 -99 SPO 1997 04 07 22 56 304 6.0 -9 681.10 -40.2 -39.4 -40.2 71 -99 SPO 1997 04 07 22 57 304 6.0 -9 681.10 -40.2 -39.4 -40.2 71 -99 SPO 1997 04 07 22 58 304 6.0 -9 681.10 -40.2 -39.4 -40.2 71 -99 SPO 1997 04 07 22 59 305 5.8 -9 681.00 -40.2 -39.5 -40.2 72 -99 SPO 1997 04 07 23 00 306 5.8 -9 681.00 -40.2 -39.5 -40.3 71 0 SPO 1997 04 07 23 01 306 5.8 -9 681.00 -40.3 -39.5 -40.4 71 -99 SPO 1997 04 07 23 02 305 5.8 -9 681.00 -40.4 -39.5 -40.4 72 -99 SPO 1997 04 07 23 03 306 5.7 -9 681.00 -40.4 -39.5 -40.5 71 -99 SPO 1997 04 07 23 04 306 5.8 -9 681.00 -40.5 -39.5 -40.5 72 -99 SPO 1997 04 07 23 05 306 5.7 -9 681.00 -40.5 -39.5 -40.5 72 -99 SPO 1997 04 07 23 06 307 5.8 -9 681.00 -40.5 -39.5 -40.6 72 -99 SPO 1997 04 07 23 07 307 5.7 -9 681.00 -40.5 -39.6 -40.6 70 -99 SPO 1997 04 07 23 08 308 5.7 -9 681.10 -40.6 -39.6 -40.6 71 -99 SPO 1997 04 07 23 09 308 5.7 -9 681.10 -40.6 -39.7 -40.6 71 -99 SPO 1997 04 07 23 10 309 5.7 -9 681.10 -40.6 -39.7 -40.6 70 -99 SPO 1997 04 07 23 11 309 5.7 -9 681.10 -40.6 -39.7 -40.6 70 -99 SPO 1997 04 07 23 12 311 5.3 -9 681.00 -40.6 -39.7 -40.6 71 -99 SPO 1997 04 07 23 13 311 5.2 -9 681.00 -40.6 -39.7 -40.6 72 -99 SPO 1997 04 07 23 14 312 5.2 -9 681.00 -40.6 -39.7 -40.6 72 -99 SPO 1997 04 07 23 15 312 5.0 -9 681.00 -40.6 -39.8 -40.6 72 -99 SPO 1997 04 07 23 16 312 5.1 -9 681.00 -40.6 -39.8 -40.6 71 -99 SPO 1997 04 07 23 17 313 5.1 -9 681.00 -40.6 -39.9 -40.7 71 -99 SPO 1997 04 07 23 18 313 5.1 -9 681.00 -40.7 -40.0 -40.7 71 -99 SPO 1997 04 07 23 19 314 4.9 -9 681.00 -40.7 -40.0 -40.7 71 -99 SPO 1997 04 07 23 20 315 4.9 -9 681.00 -40.7 -40.0 -40.7 71 -99 SPO 1997 04 07 23 21 316 4.8 -9 681.00 -40.7 -40.1 -40.7 71 -99 SPO 1997 04 07 23 22 316 4.8 -9 681.00 -40.7 -40.1 -40.8 71 -99 SPO 1997 04 07 23 23 316 4.8 -9 681.00 -40.7 -40.1 -40.8 71 -99 SPO 1997 04 07 23 24 316 4.8 -9 681.00 -40.7 -40.1 -40.8 70 -99 SPO 1997 04 07 23 25 317 4.7 -9 681.00 -40.7 -40.1 -40.7 70 -99 SPO 1997 04 07 23 26 317 4.6 -9 681.00 -40.7 -40.2 -40.8 71 -99 SPO 1997 04 07 23 27 319 4.6 -9 681.00 -40.8 -40.2 -40.8 71 -99 SPO 1997 04 07 23 28 320 4.5 -9 681.00 -40.8 -40.2 -40.8 71 -99 SPO 1997 04 07 23 29 320 4.5 -9 681.00 -40.8 -40.2 -40.8 71 -99 SPO 1997 04 07 23 30 319 4.6 -9 681.00 -40.7 -40.2 -40.8 71 -99 SPO 1997 04 07 23 31 319 4.5 -9 681.00 -40.7 -40.2 -40.8 71 -99 SPO 1997 04 07 23 32 320 4.5 -9 681.00 -40.7 -40.2 -40.7 71 -99 SPO 1997 04 07 23 33 320 4.5 -9 681.00 -40.7 -40.2 -40.7 71 -99 SPO 1997 04 07 23 34 321 4.4 -9 681.00 -40.7 -40.2 -40.7 71 -99 SPO 1997 04 07 23 35 321 4.5 -9 681.00 -40.7 -40.2 -40.8 71 -99 SPO 1997 04 07 23 36 322 4.4 -9 681.00 -40.7 -40.3 -40.7 71 -99 SPO 1997 04 07 23 37 323 4.5 -9 681.00 -40.7 -40.3 -40.7 71 -99 SPO 1997 04 07 23 38 323 4.5 -9 681.00 -40.7 -40.3 -40.8 71 -99 SPO 1997 04 07 23 39 323 4.5 -9 681.00 -40.7 -40.4 -40.8 70 -99 SPO 1997 04 07 23 40 323 4.5 -9 681.00 -40.7 -40.4 -40.8 70 -99 SPO 1997 04 07 23 41 322 4.5 -9 681.00 -40.7 -40.4 -40.8 70 -99 SPO 1997 04 07 23 42 321 4.5 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 43 320 4.4 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 44 318 4.5 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 45 317 4.6 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 46 316 4.6 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 47 315 4.7 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 48 314 4.7 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 49 313 4.8 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 50 314 4.8 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 51 314 4.7 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 52 315 4.7 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 53 318 4.6 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 54 320 4.7 -9 680.90 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 55 320 4.7 -9 681.00 -40.8 -40.4 -40.8 71 -99 SPO 1997 04 07 23 56 320 4.7 -9 681.00 -40.7 -40.4 -40.8 71 -99 SPO 1997 04 07 23 57 321 4.6 -9 680.90 -40.7 -40.3 -40.8 71 -99 SPO 1997 04 07 23 58 322 4.6 -9 680.90 -40.7 -40.3 -40.8 -99 -99 SPO 1997 04 07 23 59 323 4.7 -9 680.90 -40.7 -40.3 -40.8 -99 -99 SPO 1997 04 08 00 00 324 4.6 -9 680.90 -40.7 -40.3 -40.8 -99 0 SPO 1997 04 08 00 01 325 4.8 -9 680.90 -40.7 -40.3 -40.8 -99 -99 SPO 1997 04 08 00 02 325 4.7 -9 680.90 -40.7 -40.4 -40.8 -99 -99 SPO 1997 04 08 00 03 325 4.7 -9 680.90 -40.7 -40.4 -40.8 -99 -99 SPO 1997 04 08 00 04 325 4.7 -9 680.90 -40.7 -40.5 -40.8 -99 -99 SPO 1997 04 08 00 05 325 4.9 -9 680.90 -40.7 -40.5 -40.8 -99 -99 SPO 1997 04 08 00 06 323 5.1 -9 680.90 -40.7 -40.5 -40.8 -99 -99 SPO 1997 04 08 00 07 323 5.0 -9 680.90 -40.7 -40.5 -40.7 -99 -99 SPO 1997 04 08 00 08 323 5.2 -9 680.90 -40.7 -40.5 -40.7 -99 -99 SPO 1997 04 08 00 09 323 5.0 -9 680.90 -40.7 -40.4 -40.7 -99 -99 SPO 1997 04 08 00 10 324 5.0 -9 680.90 -40.7 -40.4 -40.7 -99 -99 SPO 1997 04 08 00 11 324 5.1 -9 680.90 -40.7 -40.4 -40.7 -99 -99 SPO 1997 04 08 00 12 326 4.9 -9 681.00 -40.7 -40.4 -40.7 -99 -99 SPO 1997 04 08 00 13 327 5.0 -9 680.90 -40.6 -40.4 -40.7 71 -99 SPO 1997 04 08 00 14 328 5.1 -9 680.90 -40.6 -40.4 -40.6 71 -99 SPO 1997 04 08 00 15 329 5.0 -9 680.90 -40.6 -40.3 -40.6 73 -99 SPO 1997 04 08 00 16 330 4.9 -9 680.90 -40.6 -40.3 -40.6 73 -99 SPO 1997 04 08 00 17 329 4.9 -9 680.90 -40.6 -40.3 -40.6 73 -99 SPO 1997 04 08 00 18 330 4.8 -9 680.90 -40.6 -40.3 -40.6 72 -99 SPO 1997 04 08 00 19 331 4.8 -9 680.90 -40.5 -40.4 -40.6 72 -99 SPO 1997 04 08 00 20 332 4.8 -9 680.90 -40.5 -40.4 -40.6 71 -99 SPO 1997 04 08 00 21 334 5.0 -9 680.90 -40.5 -40.4 -40.6 70 -99 SPO 1997 04 08 00 22 334 5.0 -9 680.90 -40.5 -40.3 -40.6 70 -99 SPO 1997 04 08 00 23 333 4.8 -9 680.90 -40.5 -40.3 -40.6 70 -99 SPO 1997 04 08 00 24 333 5.0 -9 680.90 -40.5 -40.3 -40.6 70 -99 SPO 1997 04 08 00 25 332 4.9 -9 681.00 -40.5 -40.4 -40.6 70 -99 SPO 1997 04 08 00 26 332 5.1 -9 681.00 -40.5 -40.4 -40.6 71 -99 SPO 1997 04 08 00 27 334 5.0 -9 681.00 -40.6 -40.5 -40.6 72 -99 SPO 1997 04 08 00 28 335 5.0 -9 680.90 -40.6 -40.5 -40.6 72 -99 SPO 1997 04 08 00 29 334 4.8 -9 681.00 -40.6 -40.5 -40.7 73 -99 SPO 1997 04 08 00 30 333 4.8 -9 681.00 -40.6 -40.5 -40.7 72 -99 SPO 1997 04 08 00 31 332 4.9 -9 681.00 -40.6 -40.6 -40.7 71 -99 SPO 1997 04 08 00 32 333 5.0 -9 681.00 -40.7 -40.5 -40.7 71 -99 SPO 1997 04 08 00 33 335 5.2 -9 681.00 -40.7 -40.6 -40.8 71 -99 SPO 1997 04 08 00 34 336 5.1 -9 681.00 -40.7 -40.5 -40.8 71 -99 SPO 1997 04 08 00 35 335 5.1 -9 681.00 -40.8 -40.6 -40.8 71 -99 SPO 1997 04 08 00 36 334 5.1 -9 681.00 -40.8 -40.5 -40.9 70 -99 SPO 1997 04 08 00 37 334 5.0 -9 681.00 -40.8 -40.6 -40.9 70 -99 SPO 1997 04 08 00 38 335 5.1 -9 681.00 -40.8 -40.6 -40.9 70 -99 SPO 1997 04 08 00 39 336 5.0 -9 681.00 -40.9 -40.6 -41.0 71 -99 SPO 1997 04 08 00 40 336 5.2 -9 681.00 -40.9 -40.6 -41.0 71 -99 SPO 1997 04 08 00 41 335 5.2 -9 681.00 -41.0 -40.5 -41.0 71 -99 SPO 1997 04 08 00 42 335 5.2 -9 680.90 -41.0 -40.5 -41.1 70 -99 SPO 1997 04 08 00 43 337 5.2 -9 680.90 -41.0 -40.5 -41.1 70 -99 SPO 1997 04 08 00 44 338 5.0 -9 680.90 -41.1 -40.5 -41.1 70 -99 SPO 1997 04 08 00 45 339 5.1 -9 680.90 -41.1 -40.5 -41.2 70 -99 SPO 1997 04 08 00 46 338 5.2 -9 680.90 -41.2 -40.6 -41.2 70 -99 SPO 1997 04 08 00 47 338 5.2 -9 680.90 -41.2 -40.6 -41.3 70 -99 SPO 1997 04 08 00 48 337 5.3 -9 680.90 -41.2 -40.6 -41.2 69 -99 SPO 1997 04 08 00 49 337 5.4 -9 680.90 -41.3 -40.6 -41.4 70 -99 SPO 1997 04 08 00 50 337 5.4 -9 680.90 -41.4 -40.7 -41.4 70 -99 SPO 1997 04 08 00 51 337 5.4 -9 680.90 -41.4 -40.7 -41.5 70 -99 SPO 1997 04 08 00 52 337 5.2 -9 680.90 -41.5 -40.7 -41.5 70 -99 SPO 1997 04 08 00 53 339 5.1 -9 680.90 -41.5 -40.7 -41.6 70 -99 SPO 1997 04 08 00 54 339 5.1 -9 680.90 -41.6 -40.7 -41.6 70 -99 SPO 1997 04 08 00 55 340 5.3 -9 680.90 -41.6 -40.7 -41.7 70 -99 SPO 1997 04 08 00 56 340 5.4 -9 680.90 -41.7 -40.8 -41.8 70 -99 SPO 1997 04 08 00 57 339 5.4 -9 680.90 -41.7 -40.7 -41.8 70 -99 SPO 1997 04 08 00 58 339 5.4 -9 680.90 -41.8 -40.8 -41.8 70 -99 SPO 1997 04 08 00 59 338 5.3 -9 680.90 -41.8 -40.8 -41.8 70 -99 SPO 1997 04 08 01 00 337 5.4 -9 680.90 -41.9 -40.8 -41.9 70 0 SPO 1997 04 08 01 01 337 5.5 -9 680.90 -41.9 -40.8 -41.9 70 -99 SPO 1997 04 08 01 02 337 5.4 -9 680.90 -41.9 -40.8 -41.9 70 -99 SPO 1997 04 08 01 03 338 5.4 -9 680.90 -41.9 -40.8 -42.0 70 -99 SPO 1997 04 08 01 04 338 5.4 -9 680.90 -42.0 -40.8 -42.0 69 -99 SPO 1997 04 08 01 05 338 5.4 -9 680.90 -42.0 -40.7 -42.0 69 -99 SPO 1997 04 08 01 06 338 5.4 -9 680.90 -42.0 -40.7 -42.1 69 -99 SPO 1997 04 08 01 07 340 5.3 -9 680.90 -42.1 -40.8 -42.1 69 -99 SPO 1997 04 08 01 08 341 5.4 -9 680.90 -42.2 -40.8 -42.2 70 -99 SPO 1997 04 08 01 09 341 5.5 -9 680.80 -42.2 -40.8 -42.2 70 -99 SPO 1997 04 08 01 10 339 5.5 -9 680.80 -42.1 -40.8 -42.2 69 -99 SPO 1997 04 08 01 11 338 5.6 -9 680.80 -42.1 -40.8 -42.2 67 -99 SPO 1997 04 08 01 12 337 5.6 -9 680.80 -42.2 -40.8 -42.2 68 -99 SPO 1997 04 08 01 13 337 5.6 -9 680.80 -42.2 -40.8 -42.1 69 -99 SPO 1997 04 08 01 14 336 5.7 -9 680.70 -42.1 -40.9 -42.2 69 -99 SPO 1997 04 08 01 15 335 5.7 -9 680.70 -42.2 -40.9 -42.2 70 -99 SPO 1997 04 08 01 16 333 5.8 -9 680.70 -42.1 -40.9 -42.1 69 -99 SPO 1997 04 08 01 17 332 5.7 -9 680.70 -42.1 -41.0 -42.1 71 -99 SPO 1997 04 08 01 18 331 5.6 -9 680.70 -42.1 -41.0 -42.1 70 -99 SPO 1997 04 08 01 19 331 5.6 -9 680.70 -42.1 -41.0 -42.1 69 -99 SPO 1997 04 08 01 20 331 5.6 -9 680.70 -42.1 -40.9 -42.1 69 -99 SPO 1997 04 08 01 21 331 5.4 -9 680.80 -42.1 -40.9 -42.1 69 -99 SPO 1997 04 08 01 22 332 5.4 -9 680.80 -42.1 -40.9 -42.1 69 -99 SPO 1997 04 08 01 23 330 5.1 -9 680.80 -42.1 -40.9 -42.1 69 -99 SPO 1997 04 08 01 24 329 5.0 -9 680.80 -42.1 -40.9 -42.2 69 -99 SPO 1997 04 08 01 25 327 4.8 -9 680.80 -42.2 -41.0 -42.2 70 -99 SPO 1997 04 08 01 26 329 4.8 -9 680.80 -42.2 -40.9 -42.3 71 -99 SPO 1997 04 08 01 27 330 4.8 -9 680.80 -42.2 -40.9 -42.3 70 -99 SPO 1997 04 08 01 28 332 4.8 -9 680.80 -42.3 -41.0 -42.3 71 -99 SPO 1997 04 08 01 29 332 4.7 -9 680.80 -42.3 -41.0 -42.4 70 -99 SPO 1997 04 08 01 30 334 4.8 -9 680.80 -42.4 -40.9 -42.4 71 -99 SPO 1997 04 08 01 31 336 4.8 -9 680.80 -42.3 -40.9 -42.3 69 -99 SPO 1997 04 08 01 32 339 4.4 -9 680.80 -42.2 -40.9 -42.3 68 -99 SPO 1997 04 08 01 33 341 4.4 -9 680.80 -42.4 -41.0 -42.5 69 -99 SPO 1997 04 08 01 34 341 4.3 -9 680.80 -42.4 -41.0 -42.6 67 -99 SPO 1997 04 08 01 35 343 4.4 -9 680.80 -42.5 -41.1 -42.6 68 -99 SPO 1997 04 08 01 36 343 4.3 -9 680.80 -42.6 -41.2 -42.7 69 -99 SPO 1997 04 08 01 37 343 4.4 -9 680.80 -42.7 -41.2 -42.7 70 -99 SPO 1997 04 08 01 38 343 4.5 -9 680.80 -42.7 -41.2 -42.7 69 -99 SPO 1997 04 08 01 39 344 4.6 -9 680.80 -42.7 -41.2 -42.8 69 -99 SPO 1997 04 08 01 40 343 4.8 -9 680.80 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 41 340 4.9 -9 680.80 -42.8 -41.2 -42.8 69 -99 SPO 1997 04 08 01 42 339 4.8 -9 680.80 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 43 337 4.9 -9 680.80 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 44 339 5.0 -9 680.80 -42.8 -41.3 -42.7 69 -99 SPO 1997 04 08 01 45 340 5.1 -9 680.80 -42.7 -41.3 -42.7 69 -99 SPO 1997 04 08 01 46 341 5.1 -9 680.70 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 47 344 4.7 -9 680.80 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 48 341 4.7 -9 680.80 -42.9 -41.4 -43.0 69 -99 SPO 1997 04 08 01 49 339 4.9 -9 680.70 -42.9 -41.4 -43.0 68 -99 SPO 1997 04 08 01 50 338 4.9 -9 680.80 -43.0 -41.4 -43.0 69 -99 SPO 1997 04 08 01 51 338 5.1 -9 680.70 -42.8 -41.3 -42.9 68 -99 SPO 1997 04 08 01 52 338 5.0 -9 680.70 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 53 340 4.9 -9 680.70 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 54 342 4.9 -9 680.70 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 01 55 346 4.6 -9 680.70 -42.8 -41.4 -42.8 69 -99 SPO 1997 04 08 01 56 339 4.7 -9 680.70 -42.8 -41.4 -42.9 69 -99 SPO 1997 04 08 01 57 337 4.9 -9 680.70 -42.8 -41.4 -43.0 68 -99 SPO 1997 04 08 01 58 333 5.0 -9 680.70 -42.9 -41.4 -42.9 69 -99 SPO 1997 04 08 01 59 332 5.0 -9 680.70 -42.8 -41.4 -42.8 69 -99 SPO 1997 04 08 02 00 332 5.0 -9 680.70 -42.8 -41.4 -42.8 69 0 SPO 1997 04 08 02 01 333 4.9 -9 680.70 -42.8 -41.4 -42.8 69 -99 SPO 1997 04 08 02 02 335 4.9 -9 680.70 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 02 03 338 4.9 -9 680.60 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 02 04 339 4.8 -9 680.60 -42.8 -41.3 -42.9 69 -99 SPO 1997 04 08 02 05 339 4.7 -9 680.60 -42.8 -41.3 -42.9 69 -99 SPO 1997 04 08 02 06 337 5.0 -9 680.60 -42.9 -41.3 -43.0 70 -99 SPO 1997 04 08 02 07 334 5.1 -9 680.60 -42.9 -41.3 -43.0 69 -99 SPO 1997 04 08 02 08 331 5.2 -9 680.60 -42.9 -41.3 -43.0 69 -99 SPO 1997 04 08 02 09 331 5.3 -9 680.60 -42.9 -41.3 -42.9 69 -99 SPO 1997 04 08 02 10 330 5.3 -9 680.60 -42.8 -41.3 -42.8 69 -99 SPO 1997 04 08 02 11 330 5.3 -9 680.60 -42.8 -41.2 -42.7 69 -99 SPO 1997 04 08 02 12 331 5.2 -9 680.60 -42.8 -41.2 -42.7 70 -99 SPO 1997 04 08 02 13 331 5.1 -9 680.60 -42.7 -41.2 -42.7 69 -99 SPO 1997 04 08 02 14 333 5.1 -9 680.60 -42.6 -41.2 -42.7 69 -99 SPO 1997 04 08 02 15 337 5.0 -9 680.60 -42.6 -41.2 -42.7 69 -99 SPO 1997 04 08 02 16 338 4.9 -9 680.60 -42.6 -41.3 -42.7 69 -99 SPO 1997 04 08 02 17 338 4.8 -9 680.60 -42.6 -41.2 -42.6 69 -99 SPO 1997 04 08 02 18 340 4.7 -9 680.60 -42.6 -41.2 -42.6 68 -99 SPO 1997 04 08 02 19 342 4.6 -9 680.50 -42.6 -41.3 -42.6 69 -99 SPO 1997 04 08 02 20 343 4.8 -9 680.50 -42.6 -41.4 -42.6 69 -99 SPO 1997 04 08 02 21 341 5.0 -9 680.50 -42.6 -41.4 -42.7 69 -99 SPO 1997 04 08 02 22 340 4.9 -9 680.50 -42.6 -41.4 -42.7 69 -99 SPO 1997 04 08 02 23 338 5.0 -9 680.50 -42.6 -41.4 -42.7 69 -99 SPO 1997 04 08 02 24 338 5.2 -9 680.50 -42.6 -41.4 -42.6 69 -99 SPO 1997 04 08 02 25 339 5.2 -9 680.50 -42.5 -41.4 -42.5 69 -99 SPO 1997 04 08 02 26 339 5.1 -9 680.50 -42.5 -41.4 -42.5 69 -99 SPO 1997 04 08 02 27 341 5.0 -9 680.50 -42.4 -41.4 -42.4 69 -99 SPO 1997 04 08 02 28 344 4.8 -9 680.50 -42.4 -41.4 -42.4 69 -99 SPO 1997 04 08 02 29 347 4.7 -9 680.50 -42.4 -41.5 -42.5 69 -99 SPO 1997 04 08 02 30 346 4.6 -9 680.50 -42.4 -41.5 -42.5 69 -99 SPO 1997 04 08 02 31 344 4.7 -9 680.50 -42.4 -41.5 -42.5 68 -99 SPO 1997 04 08 02 32 344 4.7 -9 680.50 -42.4 -41.4 -42.5 68 -99 SPO 1997 04 08 02 33 345 4.7 -9 680.40 -42.5 -41.4 -42.5 69 -99 SPO 1997 04 08 02 34 346 4.8 -9 680.40 -42.5 -41.4 -42.5 69 -99 SPO 1997 04 08 02 35 343 4.9 -9 680.40 -42.5 -41.4 -42.5 69 -99 SPO 1997 04 08 02 36 341 4.8 -9 680.40 -42.4 -41.4 -42.5 69 -99 SPO 1997 04 08 02 37 341 4.8 -9 680.40 -42.4 -41.3 -42.5 69 -99 SPO 1997 04 08 02 38 347 4.7 -9 680.40 -42.4 -41.4 -42.5 69 -99 SPO 1997 04 08 02 39 351 4.7 -9 680.40 -42.4 -41.4 -42.5 69 -99 SPO 1997 04 08 02 40 350 4.8 -9 680.40 -42.4 -41.4 -42.6 69 -99 SPO 1997 04 08 02 41 349 4.8 -9 680.40 -42.5 -41.4 -42.5 69 -99 SPO 1997 04 08 02 42 351 4.8 -9 680.30 -42.5 -41.5 -42.5 70 -99 SPO 1997 04 08 02 43 352 4.7 -9 680.30 -42.5 -41.5 -42.5 69 -99 SPO 1997 04 08 02 44 350 4.8 -9 680.30 -42.5 -41.5 -42.5 69 -99 SPO 1997 04 08 02 45 348 5.0 -9 680.30 -42.5 -41.5 -42.5 69 -99 SPO 1997 04 08 02 46 348 5.0 -9 680.30 -42.5 -41.5 -42.6 69 -99 SPO 1997 04 08 02 47 348 4.9 -9 680.30 -42.5 -41.5 -42.5 69 -99 SPO 1997 04 08 02 48 350 4.7 -9 680.30 -42.4 -41.5 -42.5 69 -99 SPO 1997 04 08 02 49 353 4.8 -9 680.30 -42.4 -41.5 -42.4 69 -99 SPO 1997 04 08 02 50 350 4.8 -9 680.30 -42.4 -41.5 -42.4 69 -99 SPO 1997 04 08 02 51 348 4.8 -9 680.30 -42.4 -41.5 -42.4 69 -99 SPO 1997 04 08 02 52 350 4.8 -9 680.30 -42.3 -41.4 -42.3 69 -99 SPO 1997 04 08 02 53 349 4.7 -9 680.30 -42.3 -41.4 -42.3 70 -99 SPO 1997 04 08 02 54 348 4.7 -9 680.30 -42.3 -41.5 -42.3 70 -99 SPO 1997 04 08 02 55 349 4.8 -9 680.30 -42.2 -41.5 -42.3 69 -99 SPO 1997 04 08 02 56 351 4.8 -9 680.30 -42.2 -41.5 -42.2 69 -99 SPO 1997 04 08 02 57 353 4.8 -9 680.30 -42.2 -41.5 -42.3 70 -99 SPO 1997 04 08 02 58 353 4.7 -9 680.30 -42.2 -41.6 -42.3 70 -99 SPO 1997 04 08 02 59 349 4.9 -9 680.30 -42.3 -41.6 -42.3 70 -99 SPO 1997 04 08 03 00 348 4.7 -9 680.30 -42.2 -41.6 -42.3 69 0 SPO 1997 04 08 03 01 348 4.7 -9 680.30 -42.2 -41.6 -42.3 68 -99 SPO 1997 04 08 03 02 347 4.7 -9 680.30 -42.2 -41.6 -42.4 68 -99 SPO 1997 04 08 03 03 345 4.9 -9 680.20 -42.3 -41.7 -42.4 70 -99 SPO 1997 04 08 03 04 344 5.2 -9 680.20 -42.3 -41.7 -42.4 71 -99 SPO 1997 04 08 03 05 342 5.3 -9 680.20 -42.3 -41.6 -42.3 71 -99 SPO 1997 04 08 03 06 341 5.5 -9 680.20 -42.3 -41.5 -42.3 71 -99 SPO 1997 04 08 03 07 341 5.6 -9 680.20 -42.2 -41.5 -42.3 69 -99 SPO 1997 04 08 03 08 341 5.7 -9 680.10 -42.2 -41.4 -42.2 70 -99 SPO 1997 04 08 03 09 344 5.7 -9 680.10 -42.2 -41.5 -42.2 70 -99 SPO 1997 04 08 03 10 345 5.6 -9 680.10 -42.2 -41.5 -42.2 70 -99 SPO 1997 04 08 03 11 345 5.5 -9 680.10 -42.2 -41.5 -42.3 70 -99 SPO 1997 04 08 03 12 345 5.6 -9 680.10 -42.2 -41.5 -42.3 70 -99 SPO 1997 04 08 03 13 345 5.5 -9 680.10 -42.2 -41.6 -42.3 69 -99 SPO 1997 04 08 03 14 343 5.3 -9 680.10 -42.2 -41.7 -42.3 68 -99 SPO 1997 04 08 03 15 341 5.4 -9 680.10 -42.3 -41.7 -42.4 69 -99 SPO 1997 04 08 03 16 339 5.3 -9 680.10 -42.3 -41.8 -42.3 68 -99 SPO 1997 04 08 03 17 342 5.3 -9 680.10 -42.2 -41.8 -42.3 68 -99 SPO 1997 04 08 03 18 342 5.3 -9 680.10 -42.2 -41.7 -42.3 69 -99 SPO 1997 04 08 03 19 340 5.2 -9 680.10 -42.3 -41.6 -42.4 70 -99 SPO 1997 04 08 03 20 343 5.2 -9 680.10 -42.4 -41.3 -42.4 71 -99 SPO 1997 04 08 03 21 346 5.1 -9 680.10 -42.4 -41.4 -42.5 71 -99 SPO 1997 04 08 03 22 345 5.2 -9 680.10 -42.4 -41.4 -42.5 71 -99 SPO 1997 04 08 03 23 342 5.1 -9 680.10 -42.4 -41.2 -42.5 71 -99 SPO 1997 04 08 03 24 345 5.1 -9 680.10 -42.4 -41.0 -42.4 71 -99 SPO 1997 04 08 03 25 346 4.9 -9 680.10 -42.4 -41.0 -42.4 69 -99 SPO 1997 04 08 03 26 346 4.9 -9 680.10 -42.4 -41.1 -42.4 69 -99 SPO 1997 04 08 03 27 345 5.2 -9 680.10 -42.4 -41.1 -42.4 69 -99 SPO 1997 04 08 03 28 344 5.4 -9 680.10 -42.4 -41.0 -42.4 69 -99 SPO 1997 04 08 03 29 344 5.3 -9 680.10 -42.4 -41.0 -42.4 69 -99 SPO 1997 04 08 03 30 345 5.1 -9 680.10 -42.4 -41.0 -42.4 69 -99 SPO 1997 04 08 03 31 346 5.3 -9 680.00 -42.4 -41.0 -42.4 71 -99 SPO 1997 04 08 03 32 345 5.3 -9 680.00 -42.4 -41.1 -42.4 71 -99 SPO 1997 04 08 03 33 343 5.6 -9 680.00 -42.3 -41.0 -42.3 69 -99 SPO 1997 04 08 03 34 344 5.5 -9 680.00 -42.3 -41.0 -42.2 69 -99 SPO 1997 04 08 03 35 345 5.3 -9 680.00 -42.2 -41.2 -42.2 70 -99 SPO 1997 04 08 03 36 346 5.2 -9 680.00 -42.2 -41.3 -42.2 70 -99 SPO 1997 04 08 03 37 346 5.0 -9 680.00 -42.2 -41.3 -42.2 71 -99 SPO 1997 04 08 03 38 348 4.8 -9 680.10 -42.1 -41.4 -42.2 70 -99 SPO 1997 04 08 03 39 349 4.7 -9 680.10 -42.1 -41.4 -42.2 69 -99 SPO 1997 04 08 03 40 348 4.8 -9 680.00 -42.2 -41.4 -42.3 70 -99 SPO 1997 04 08 03 41 349 4.7 -9 680.00 -42.2 -41.3 -42.3 69 -99 SPO 1997 04 08 03 42 348 4.8 -9 680.00 -42.2 -41.3 -42.3 69 -99 SPO 1997 04 08 03 43 349 4.4 -9 680.10 -42.2 -41.3 -42.3 69 -99 SPO 1997 04 08 03 44 352 4.6 -9 680.10 -42.2 -41.4 -42.3 68 -99 SPO 1997 04 08 03 45 352 4.6 -9 680.10 -42.2 -41.5 -42.3 69 -99 SPO 1997 04 08 03 46 350 4.4 -9 680.10 -42.2 -41.4 -42.3 68 -99 SPO 1997 04 08 03 47 346 4.5 -9 680.10 -42.2 -41.4 -42.3 68 -99 SPO 1997 04 08 03 48 346 4.9 -9 680.10 -42.3 -41.4 -42.3 70 -99 SPO 1997 04 08 03 49 346 4.7 -9 680.10 -42.2 -41.4 -42.2 70 -99 SPO 1997 04 08 03 50 349 4.8 -9 680.10 -42.2 -41.5 -42.2 70 -99 SPO 1997 04 08 03 51 348 4.6 -9 680.10 -42.2 -41.5 -42.3 70 -99 SPO 1997 04 08 03 52 347 4.6 -9 680.10 -42.3 -41.6 -42.3 71 -99 SPO 1997 04 08 03 53 348 4.8 -9 680.10 -42.3 -41.7 -42.4 71 -99 SPO 1997 04 08 03 54 347 5.0 -9 680.00 -42.3 -41.7 -42.4 70 -99 SPO 1997 04 08 03 55 347 4.9 -9 680.00 -42.3 -41.7 -42.4 69 -99 SPO 1997 04 08 03 56 347 4.7 -9 680.00 -42.3 -41.8 -42.4 68 -99 SPO 1997 04 08 03 57 348 4.3 -9 680.00 -42.3 -41.9 -42.4 69 -99 SPO 1997 04 08 03 58 348 4.6 -9 680.00 -42.4 -42.0 -42.5 69 -99 SPO 1997 04 08 03 59 347 4.8 -9 680.00 -42.4 -41.9 -42.5 69 -99 SPO 1997 04 08 04 00 347 5.0 -9 680.00 -42.4 -41.9 -42.5 69 0 SPO 1997 04 08 04 01 346 5.5 -9 680.00 -42.4 -41.9 -42.4 69 -99 SPO 1997 04 08 04 02 345 5.8 -9 679.90 -42.4 -41.8 -42.4 69 -99 SPO 1997 04 08 04 03 344 6.3 -9 679.90 -42.4 -41.7 -42.5 69 -99 SPO 1997 04 08 04 04 344 6.3 -9 679.90 -42.4 -41.7 -42.5 69 -99 SPO 1997 04 08 04 05 346 6.4 -9 679.90 -42.4 -41.7 -42.5 69 -99 SPO 1997 04 08 04 06 347 6.3 -9 679.90 -42.4 -41.8 -42.5 69 -99 SPO 1997 04 08 04 07 348 6.3 -9 679.90 -42.4 -41.8 -42.6 69 -99 SPO 1997 04 08 04 08 349 6.2 -9 679.90 -42.5 -41.8 -42.6 70 -99 SPO 1997 04 08 04 09 348 6.2 -9 679.80 -42.5 -41.8 -42.6 69 -99 SPO 1997 04 08 04 10 348 6.1 -9 679.80 -42.5 -41.8 -42.6 68 -99 SPO 1997 04 08 04 11 348 6.2 -9 679.80 -42.6 -41.9 -42.6 69 -99 SPO 1997 04 08 04 12 349 6.1 -9 679.80 -42.6 -41.9 -42.6 69 -99 SPO 1997 04 08 04 13 348 6.1 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 14 348 6.1 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 15 347 6.2 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 16 346 6.3 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 17 345 6.6 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 18 345 6.6 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 19 345 6.6 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 20 346 6.6 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 21 345 6.5 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 22 344 6.4 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 23 345 6.4 -9 679.80 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 04 24 346 6.3 -9 679.80 -42.6 -42.0 -42.7 68 -99 SPO 1997 04 08 04 25 346 6.2 -9 679.80 -42.7 -42.0 -42.7 69 -99 SPO 1997 04 08 04 26 346 6.2 -9 679.80 -42.6 -42.0 -42.7 68 -99 SPO 1997 04 08 04 27 346 6.2 -9 679.80 -42.6 -42.0 -42.6 69 -99 SPO 1997 04 08 04 28 345 6.0 -9 679.80 -42.5 -42.0 -42.7 69 -99 SPO 1997 04 08 04 29 346 6.1 -9 679.80 -42.6 -42.1 -42.6 69 -99 SPO 1997 04 08 04 30 345 6.2 -9 679.80 -42.5 -42.1 -42.6 67 -99 SPO 1997 04 08 04 31 343 6.3 -9 679.80 -42.5 -42.0 -42.6 68 -99 SPO 1997 04 08 04 32 343 6.3 -9 679.80 -42.5 -41.9 -42.6 69 -99 SPO 1997 04 08 04 33 344 6.5 -9 679.80 -42.5 -41.8 -42.6 69 -99 SPO 1997 04 08 04 34 344 6.2 -9 679.90 -42.5 -41.9 -42.6 69 -99 SPO 1997 04 08 04 35 346 5.9 -9 679.90 -42.5 -42.0 -42.6 69 -99 SPO 1997 04 08 04 36 347 5.7 -9 679.90 -42.5 -42.1 -42.5 69 -99 SPO 1997 04 08 04 37 347 5.7 -9 679.90 -42.5 -42.2 -42.5 69 -99 SPO 1997 04 08 04 38 344 5.8 -9 679.90 -42.5 -42.3 -42.5 67 -99 SPO 1997 04 08 04 39 343 5.9 -9 679.90 -42.4 -42.2 -42.5 66 -99 SPO 1997 04 08 04 40 343 6.2 -9 679.90 -42.4 -42.0 -42.5 67 -99 SPO 1997 04 08 04 41 343 6.1 -9 679.90 -42.4 -42.0 -42.5 68 -99 SPO 1997 04 08 04 42 345 5.6 -9 679.90 -42.4 -42.2 -42.5 69 -99 SPO 1997 04 08 04 43 348 5.6 -9 679.90 -42.4 -42.2 -42.5 69 -99 SPO 1997 04 08 04 44 349 5.4 -9 679.90 -42.4 -42.3 -42.5 69 -99 SPO 1997 04 08 04 45 349 5.3 -9 679.90 -42.4 -42.4 -42.5 69 -99 SPO 1997 04 08 04 46 349 5.3 -9 679.90 -42.4 -42.4 -42.5 69 -99 SPO 1997 04 08 04 47 350 5.6 -9 679.90 -42.4 -42.4 -42.5 69 -99 SPO 1997 04 08 04 48 348 5.7 -9 679.80 -42.4 -42.2 -42.4 69 -99 SPO 1997 04 08 04 49 346 5.8 -9 679.80 -42.4 -42.0 -42.4 69 -99 SPO 1997 04 08 04 50 346 6.2 -9 679.80 -42.3 -41.8 -42.4 70 -99 SPO 1997 04 08 04 51 348 5.8 -9 679.90 -42.2 -41.8 -42.4 68 -99 SPO 1997 04 08 04 52 349 5.5 -9 679.90 -42.3 -41.9 -42.4 69 -99 SPO 1997 04 08 04 53 349 5.1 -9 679.90 -42.3 -42.1 -42.4 69 -99 SPO 1997 04 08 04 54 351 5.1 -9 679.90 -42.3 -42.3 -42.4 69 -99 SPO 1997 04 08 04 55 349 5.0 -9 679.90 -42.3 -42.3 -42.4 70 -99 SPO 1997 04 08 04 56 347 5.3 -9 679.90 -42.3 -42.3 -42.4 70 -99 SPO 1997 04 08 04 57 346 5.2 -9 679.90 -42.3 -42.3 -42.4 70 -99 SPO 1997 04 08 04 58 346 5.3 -9 679.90 -42.3 -42.2 -42.4 70 -99 SPO 1997 04 08 04 59 346 5.7 -9 679.90 -42.3 -42.1 -42.3 71 -99 SPO 1997 04 08 05 00 346 5.7 -9 679.80 -42.2 -42.2 -42.3 70 0 SPO 1997 04 08 05 01 346 5.6 -9 679.80 -42.2 -42.3 -42.3 70 -99 SPO 1997 04 08 05 02 344 5.0 -9 679.90 -42.3 -42.3 -42.4 71 -99 SPO 1997 04 08 05 03 344 5.0 -9 679.90 -42.3 -42.4 -42.4 70 -99 SPO 1997 04 08 05 04 345 5.1 -9 679.90 -42.3 -42.3 -42.3 70 -99 SPO 1997 04 08 05 05 349 4.8 -9 679.90 -42.2 -42.1 -42.3 69 -99 SPO 1997 04 08 05 06 346 4.8 -9 679.90 -42.2 -42.2 -42.3 69 -99 SPO 1997 04 08 05 07 347 4.3 -9 679.90 -42.2 -42.2 -42.2 69 -99 SPO 1997 04 08 05 08 345 4.7 -9 679.90 -42.2 -42.3 -42.3 70 -99 SPO 1997 04 08 05 09 343 4.6 -9 679.90 -42.2 -42.3 -42.2 70 -99 SPO 1997 04 08 05 10 343 4.8 -9 679.90 -42.2 -42.2 -42.2 70 -99 SPO 1997 04 08 05 11 344 5.3 -9 679.90 -42.2 -42.1 -42.2 70 -99 SPO 1997 04 08 05 12 342 4.9 -9 679.80 -42.2 -42.2 -42.2 70 -99 SPO 1997 04 08 05 13 342 5.0 -9 679.80 -42.0 -42.2 -42.2 69 -99 SPO 1997 04 08 05 14 343 4.8 -9 679.80 -42.0 -42.2 -42.2 69 -99 SPO 1997 04 08 05 15 345 5.0 -9 679.80 -42.1 -42.3 -42.2 70 -99 SPO 1997 04 08 05 16 344 4.7 -9 679.80 -42.1 -42.3 -42.2 70 -99 SPO 1997 04 08 05 17 345 4.8 -9 679.80 -42.1 -42.4 -42.2 71 -99 SPO 1997 04 08 05 18 343 4.7 -9 679.80 -42.1 -42.3 -42.2 71 -99 SPO 1997 04 08 05 19 345 4.5 -9 679.80 -42.1 -42.2 -42.1 69 -99 SPO 1997 04 08 05 20 347 4.2 -9 679.80 -42.1 -42.3 -42.1 69 -99 SPO 1997 04 08 05 21 349 4.7 -9 679.80 -42.1 -42.2 -42.2 69 -99 SPO 1997 04 08 05 22 347 4.6 -9 679.70 -42.1 -42.2 -42.2 69 -99 SPO 1997 04 08 05 23 344 4.4 -9 679.70 -42.0 -42.2 -42.1 69 -99 SPO 1997 04 08 05 24 344 4.1 -9 679.70 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 25 346 4.3 -9 679.70 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 26 348 4.2 -9 679.70 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 05 27 346 4.6 -9 679.70 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 28 345 4.7 -9 679.70 -42.0 -42.2 -42.1 71 -99 SPO 1997 04 08 05 29 345 4.6 -9 679.70 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 30 345 5.0 -9 679.60 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 31 345 5.1 -9 679.60 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 32 342 5.3 -9 679.60 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 05 33 341 5.3 -9 679.60 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 05 34 340 5.7 -9 679.60 -42.0 -41.9 -42.1 69 -99 SPO 1997 04 08 05 35 339 5.8 -9 679.60 -42.0 -42.0 -42.1 69 -99 SPO 1997 04 08 05 36 338 5.7 -9 679.60 -42.0 -42.0 -42.1 69 -99 SPO 1997 04 08 05 37 339 6.0 -9 679.60 -42.0 -41.9 -42.1 69 -99 SPO 1997 04 08 05 38 341 5.8 -9 679.60 -42.0 -41.8 -42.1 69 -99 SPO 1997 04 08 05 39 338 5.5 -9 679.60 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 05 40 339 5.6 -9 679.60 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 05 41 342 5.6 -9 679.60 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 42 341 5.3 -9 679.60 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 43 342 5.4 -9 679.60 -42.0 -42.2 -42.1 70 -99 SPO 1997 04 08 05 44 343 5.0 -9 679.60 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 05 45 344 5.3 -9 679.60 -42.0 -42.2 -42.1 71 -99 SPO 1997 04 08 05 46 347 5.8 -9 679.60 -42.0 -42.0 -42.1 71 -99 SPO 1997 04 08 05 47 347 5.6 -9 679.60 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 05 48 344 5.4 -9 679.60 -42.0 -42.2 -42.0 70 -99 SPO 1997 04 08 05 49 341 5.0 -9 679.60 -42.0 -42.2 -42.0 70 -99 SPO 1997 04 08 05 50 343 5.0 -9 679.60 -42.0 -42.2 -42.0 70 -99 SPO 1997 04 08 05 51 344 5.2 -9 679.60 -41.9 -42.2 -42.0 70 -99 SPO 1997 04 08 05 52 346 5.2 -9 679.60 -42.0 -42.2 -42.0 72 -99 SPO 1997 04 08 05 53 349 5.3 -9 679.60 -42.0 -42.2 -42.0 71 -99 SPO 1997 04 08 05 54 349 5.1 -9 679.60 -42.0 -42.2 -42.0 70 -99 SPO 1997 04 08 05 55 352 5.2 -9 679.60 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 05 56 350 5.3 -9 679.60 -42.0 -42.0 -42.0 70 -99 SPO 1997 04 08 05 57 345 4.9 -9 679.60 -42.0 -41.9 -42.0 70 -99 SPO 1997 04 08 05 58 341 5.3 -9 679.60 -41.9 -41.7 -41.9 70 -99 SPO 1997 04 08 05 59 338 5.3 -9 679.60 -41.8 -41.6 -41.8 69 -99 SPO 1997 04 08 06 00 335 6.0 -9 679.60 -41.8 -41.8 -41.8 70 0 SPO 1997 04 08 06 01 333 6.4 -9 679.50 -41.7 -41.8 -41.7 70 -99 SPO 1997 04 08 06 02 333 6.5 -9 679.50 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 06 03 333 6.7 -9 679.50 -41.8 -41.8 -41.9 70 -99 SPO 1997 04 08 06 04 333 6.8 -9 679.50 -41.8 -41.5 -41.9 70 -99 SPO 1997 04 08 06 05 332 7.0 -9 679.50 -41.8 -41.4 -41.8 71 -99 SPO 1997 04 08 06 06 330 6.7 -9 679.50 -41.7 -41.2 -41.8 70 -99 SPO 1997 04 08 06 07 331 6.8 -9 679.50 -41.7 -41.3 -41.6 71 -99 SPO 1997 04 08 06 08 332 6.6 -9 679.50 -41.6 -41.1 -41.6 71 -99 SPO 1997 04 08 06 09 335 6.2 -9 679.50 -41.6 -41.0 -41.6 71 -99 SPO 1997 04 08 06 10 337 5.9 -9 679.50 -41.6 -41.1 -41.6 71 -99 SPO 1997 04 08 06 11 339 5.8 -9 679.50 -41.5 -41.2 -41.6 70 -99 SPO 1997 04 08 06 12 343 5.5 -9 679.50 -41.6 -41.4 -41.6 72 -99 SPO 1997 04 08 06 13 342 5.6 -9 679.50 -41.6 -41.4 -41.8 72 -99 SPO 1997 04 08 06 14 344 5.6 -9 679.50 -41.7 -41.4 -41.8 72 -99 SPO 1997 04 08 06 15 343 5.8 -9 679.50 -41.7 -41.5 -41.8 70 -99 SPO 1997 04 08 06 16 344 5.7 -9 679.50 -41.6 -41.3 -41.6 69 -99 SPO 1997 04 08 06 17 346 5.8 -9 679.50 -41.6 -41.4 -41.6 69 -99 SPO 1997 04 08 06 18 346 5.7 -9 679.50 -41.6 -41.6 -41.7 69 -99 SPO 1997 04 08 06 19 346 5.6 -9 679.50 -41.7 -41.7 -41.8 70 -99 SPO 1997 04 08 06 20 348 5.5 -9 679.50 -41.7 -41.7 -41.8 70 -99 SPO 1997 04 08 06 21 346 5.7 -9 679.50 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 06 22 347 5.5 -9 679.50 -41.8 -41.8 -41.8 71 -99 SPO 1997 04 08 06 23 346 5.3 -9 679.50 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 06 24 345 5.6 -9 679.50 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 06 25 343 5.6 -9 679.50 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 06 26 343 5.8 -9 679.50 -41.7 -41.9 -41.8 70 -99 SPO 1997 04 08 06 27 339 5.7 -9 679.50 -41.7 -42.0 -41.8 70 -99 SPO 1997 04 08 06 28 341 5.9 -9 679.50 -41.7 -41.9 -41.8 70 -99 SPO 1997 04 08 06 29 342 5.9 -9 679.50 -41.7 -41.9 -41.8 70 -99 SPO 1997 04 08 06 30 345 6.3 -9 679.50 -41.7 -41.7 -41.8 70 -99 SPO 1997 04 08 06 31 346 6.4 -9 679.50 -41.7 -41.6 -41.8 70 -99 SPO 1997 04 08 06 32 345 6.4 -9 679.50 -41.7 -41.5 -41.8 70 -99 SPO 1997 04 08 06 33 344 6.2 -9 679.50 -41.7 -41.7 -41.8 70 -99 SPO 1997 04 08 06 34 344 6.0 -9 679.50 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 06 35 343 6.2 -9 679.50 -41.7 -41.8 -41.7 71 -99 SPO 1997 04 08 06 36 345 6.1 -9 679.50 -41.7 -41.7 -41.7 71 -99 SPO 1997 04 08 06 37 344 6.1 -9 679.50 -41.7 -41.7 -41.7 70 -99 SPO 1997 04 08 06 38 345 5.9 -9 679.50 -41.7 -41.8 -41.7 71 -99 SPO 1997 04 08 06 39 346 5.7 -9 679.50 -41.7 -41.8 -41.7 70 -99 SPO 1997 04 08 06 40 348 5.8 -9 679.50 -41.6 -41.6 -41.7 70 -99 SPO 1997 04 08 06 41 346 5.8 -9 679.50 -41.6 -41.6 -41.7 70 -99 SPO 1997 04 08 06 42 347 5.8 -9 679.40 -41.6 -41.7 -41.6 70 -99 SPO 1997 04 08 06 43 348 5.9 -9 679.40 -41.6 -41.5 -41.6 70 -99 SPO 1997 04 08 06 44 345 6.0 -9 679.40 -41.6 -41.5 -41.6 69 -99 SPO 1997 04 08 06 45 344 6.3 -9 679.40 -41.6 -41.5 -41.6 69 -99 SPO 1997 04 08 06 46 348 6.3 -9 679.40 -41.6 -41.6 -41.7 70 -99 SPO 1997 04 08 06 47 345 6.2 -9 679.30 -41.6 -41.5 -41.7 70 -99 SPO 1997 04 08 06 48 343 6.6 -9 679.30 -41.6 -41.7 -41.7 70 -99 SPO 1997 04 08 06 49 344 6.7 -9 679.30 -41.6 -41.8 -41.7 70 -99 SPO 1997 04 08 06 50 346 7.1 -9 679.30 -41.6 -41.6 -41.7 71 -99 SPO 1997 04 08 06 51 344 6.7 -9 679.30 -41.6 -41.6 -41.7 71 -99 SPO 1997 04 08 06 52 344 7.1 -9 679.30 -41.6 -41.7 -41.7 71 -99 SPO 1997 04 08 06 53 344 6.5 -9 679.30 -41.6 -41.6 -41.7 71 -99 SPO 1997 04 08 06 54 346 6.8 -9 679.30 -41.6 -41.6 -41.7 71 -99 SPO 1997 04 08 06 55 345 6.4 -9 679.20 -41.6 -41.6 -41.7 71 -99 SPO 1997 04 08 06 56 344 6.8 -9 679.30 -41.6 -41.6 -41.7 71 -99 SPO 1997 04 08 06 57 345 6.4 -9 679.30 -41.6 -41.5 -41.7 70 -99 SPO 1997 04 08 06 58 345 6.7 -9 679.30 -41.6 -41.6 -41.7 70 -99 SPO 1997 04 08 06 59 344 6.4 -9 679.30 -41.6 -41.7 -41.7 70 -99 SPO 1997 04 08 07 00 345 6.2 -9 679.30 -41.6 -41.6 -41.7 70 0 SPO 1997 04 08 07 01 348 6.3 -9 679.30 -41.6 -41.4 -41.7 70 -99 SPO 1997 04 08 07 02 346 6.7 -9 679.30 -41.6 -41.3 -41.7 70 -99 SPO 1997 04 08 07 03 347 6.6 -9 679.30 -41.6 -41.2 -41.7 70 -99 SPO 1997 04 08 07 04 347 6.6 -9 679.30 -41.6 -41.0 -41.7 70 -99 SPO 1997 04 08 07 05 346 6.3 -9 679.30 -41.6 -41.2 -41.7 70 -99 SPO 1997 04 08 07 06 346 6.3 -9 679.30 -41.6 -41.3 -41.6 71 -99 SPO 1997 04 08 07 07 347 6.5 -9 679.30 -41.6 -41.1 -41.6 71 -99 SPO 1997 04 08 07 08 347 6.5 -9 679.20 -41.6 -41.2 -41.6 70 -99 SPO 1997 04 08 07 09 347 6.4 -9 679.20 -41.5 -41.2 -41.6 70 -99 SPO 1997 04 08 07 10 348 6.7 -9 679.20 -41.5 -41.2 -41.6 70 -99 SPO 1997 04 08 07 11 348 6.5 -9 679.20 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 07 12 348 6.7 -9 679.20 -41.6 -41.4 -41.7 70 -99 SPO 1997 04 08 07 13 350 6.4 -9 679.20 -41.6 -41.5 -41.6 70 -99 SPO 1997 04 08 07 14 349 6.3 -9 679.20 -41.6 -41.6 -41.6 70 -99 SPO 1997 04 08 07 15 348 6.6 -9 679.20 -41.6 -41.6 -41.7 70 -99 SPO 1997 04 08 07 16 350 6.0 -9 679.20 -41.6 -41.7 -41.7 70 -99 SPO 1997 04 08 07 17 348 6.6 -9 679.20 -41.6 -41.8 -41.7 70 -99 SPO 1997 04 08 07 18 349 7.0 -9 679.20 -41.7 -41.9 -41.8 71 -99 SPO 1997 04 08 07 19 349 6.6 -9 679.20 -41.7 -41.8 -41.8 71 -99 SPO 1997 04 08 07 20 348 6.7 -9 679.20 -41.7 -41.8 -41.8 70 -99 SPO 1997 04 08 07 21 346 6.8 -9 679.20 -41.8 -41.9 -41.9 71 -99 SPO 1997 04 08 07 22 347 7.0 -9 679.10 -41.8 -41.8 -41.9 71 -99 SPO 1997 04 08 07 23 347 7.0 -9 679.10 -41.8 -41.7 -41.9 71 -99 SPO 1997 04 08 07 24 345 7.4 -9 679.10 -41.8 -41.4 -41.9 71 -99 SPO 1997 04 08 07 25 343 7.4 -9 679.10 -41.8 -41.1 -41.9 70 -99 SPO 1997 04 08 07 26 342 7.2 -9 679.10 -41.8 -40.9 -41.9 70 -99 SPO 1997 04 08 07 27 341 7.4 -9 679.10 -41.8 -40.5 -41.8 70 -99 SPO 1997 04 08 07 28 342 7.5 -9 679.10 -41.7 -40.4 -41.6 70 -99 SPO 1997 04 08 07 29 344 7.6 -9 679.10 -41.6 -40.5 -41.6 70 -99 SPO 1997 04 08 07 30 338 7.0 -9 679.10 -41.6 -40.7 -41.6 70 -99 SPO 1997 04 08 07 31 335 7.2 -9 679.20 -41.6 -41.0 -41.7 70 -99 SPO 1997 04 08 07 32 342 7.6 -9 679.10 -41.6 -41.0 -41.6 70 -99 SPO 1997 04 08 07 33 344 7.8 -9 679.10 -41.6 -40.8 -41.6 71 -99 SPO 1997 04 08 07 34 348 7.7 -9 679.00 -41.6 -40.2 -41.8 72 -99 SPO 1997 04 08 07 35 348 7.4 -9 679.00 -41.7 -40.1 -41.8 72 -99 SPO 1997 04 08 07 36 350 7.4 -9 679.00 -41.7 -40.2 -41.8 71 -99 SPO 1997 04 08 07 37 348 6.8 -9 679.00 -41.7 -40.3 -41.8 70 -99 SPO 1997 04 08 07 38 344 6.5 -9 679.00 -41.7 -40.9 -41.9 70 -99 SPO 1997 04 08 07 39 348 6.7 -9 679.10 -41.8 -40.8 -41.9 70 -99 SPO 1997 04 08 07 40 347 6.4 -9 679.00 -41.9 -40.8 -41.9 70 -99 SPO 1997 04 08 07 41 345 6.2 -9 679.10 -41.9 -40.8 -41.9 70 -99 SPO 1997 04 08 07 42 343 6.2 -9 679.10 -41.9 -40.6 -41.9 70 -99 SPO 1997 04 08 07 43 344 6.3 -9 679.10 -41.8 -40.4 -41.8 70 -99 SPO 1997 04 08 07 44 345 6.1 -9 679.10 -41.8 -40.4 -41.8 70 -99 SPO 1997 04 08 07 45 346 6.4 -9 679.10 -41.7 -40.4 -41.8 70 -99 SPO 1997 04 08 07 46 348 6.3 -9 679.10 -41.7 -40.1 -41.8 70 -99 SPO 1997 04 08 07 47 350 6.4 -9 679.10 -41.8 -39.9 -41.9 71 -99 SPO 1997 04 08 07 48 349 6.7 -9 679.10 -41.8 -39.7 -41.9 71 -99 SPO 1997 04 08 07 49 349 6.4 -9 679.10 -41.8 -39.7 -41.8 71 -99 SPO 1997 04 08 07 50 349 6.4 -9 679.10 -41.8 -39.6 -41.9 71 -99 SPO 1997 04 08 07 51 348 6.3 -9 679.10 -41.8 -39.6 -41.8 71 -99 SPO 1997 04 08 07 52 346 6.1 -9 679.10 -41.8 -40.0 -41.8 70 -99 SPO 1997 04 08 07 53 346 5.7 -9 679.10 -41.8 -40.2 -41.9 69 -99 SPO 1997 04 08 07 54 348 6.1 -9 679.10 -41.8 -40.2 -41.8 70 -99 SPO 1997 04 08 07 55 346 6.2 -9 679.10 -41.8 -40.0 -41.8 70 -99 SPO 1997 04 08 07 56 342 5.6 -9 679.10 -41.8 -40.2 -41.8 70 -99 SPO 1997 04 08 07 57 339 5.9 -9 679.10 -41.8 -40.6 -41.8 70 -99 SPO 1997 04 08 07 58 342 5.9 -9 679.20 -41.8 -41.0 -41.8 70 -99 SPO 1997 04 08 07 59 342 5.5 -9 679.10 -41.8 -41.3 -41.8 70 -99 SPO 1997 04 08 08 00 342 5.7 -9 679.10 -41.7 -41.4 -41.8 70 0 SPO 1997 04 08 08 01 345 5.8 -9 679.20 -41.8 -41.3 -41.9 70 -99 SPO 1997 04 08 08 02 345 5.9 -9 679.20 -41.8 -41.3 -41.9 70 -99 SPO 1997 04 08 08 03 346 5.5 -9 679.20 -41.8 -41.3 -41.9 70 -99 SPO 1997 04 08 08 04 343 5.2 -9 679.20 -41.8 -41.5 -41.9 71 -99 SPO 1997 04 08 08 05 341 5.1 -9 679.20 -41.8 -41.8 -41.9 71 -99 SPO 1997 04 08 08 06 340 4.6 -9 679.20 -41.9 -41.9 -42.0 71 -99 SPO 1997 04 08 08 07 339 4.6 -9 679.20 -41.9 -42.0 -42.0 70 -99 SPO 1997 04 08 08 08 343 4.5 -9 679.20 -41.9 -42.0 -42.0 70 -99 SPO 1997 04 08 08 09 343 4.4 -9 679.20 -41.9 -42.0 -42.0 70 -99 SPO 1997 04 08 08 10 344 4.2 -9 679.30 -41.9 -42.0 -42.0 70 -99 SPO 1997 04 08 08 11 343 4.2 -9 679.30 -41.9 -42.0 -42.0 70 -99 SPO 1997 04 08 08 12 343 4.2 -9 679.30 -42.0 -42.0 -42.0 70 -99 SPO 1997 04 08 08 13 343 3.9 -9 679.20 -42.0 -42.1 -42.0 71 -99 SPO 1997 04 08 08 14 341 4.0 -9 679.20 -41.9 -42.0 -42.0 70 -99 SPO 1997 04 08 08 15 341 4.3 -9 679.30 -42.0 -42.1 -42.0 70 -99 SPO 1997 04 08 08 16 341 4.3 -9 679.30 -42.0 -42.1 -42.0 70 -99 SPO 1997 04 08 08 17 337 4.1 -9 679.30 -42.0 -42.2 -42.0 71 -99 SPO 1997 04 08 08 18 338 4.3 -9 679.30 -42.0 -42.2 -42.0 72 -99 SPO 1997 04 08 08 19 337 4.1 -9 679.30 -42.0 -42.2 -42.0 71 -99 SPO 1997 04 08 08 20 339 4.0 -9 679.30 -42.0 -42.2 -42.0 70 -99 SPO 1997 04 08 08 21 339 3.9 -9 679.30 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 08 22 340 3.8 -9 679.30 -42.0 -42.1 -42.1 69 -99 SPO 1997 04 08 08 23 341 3.8 -9 679.30 -42.0 -42.1 -42.0 69 -99 SPO 1997 04 08 08 24 339 4.0 -9 679.30 -42.0 -42.2 -42.0 69 -99 SPO 1997 04 08 08 25 340 3.9 -9 679.30 -42.0 -42.1 -42.0 70 -99 SPO 1997 04 08 08 26 340 3.9 -9 679.30 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 08 27 339 3.8 -9 679.30 -42.0 -42.1 -42.1 71 -99 SPO 1997 04 08 08 28 339 4.0 -9 679.30 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 08 29 339 4.2 -9 679.30 -42.0 -42.1 -42.1 69 -99 SPO 1997 04 08 08 30 338 4.1 -9 679.30 -42.0 -42.0 -42.1 69 -99 SPO 1997 04 08 08 31 336 3.9 -9 679.30 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 08 32 337 3.8 -9 679.30 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 08 33 334 4.0 -9 679.30 -42.0 -42.1 -42.1 70 -99 SPO 1997 04 08 08 34 333 4.0 -9 679.30 -42.1 -42.1 -42.1 71 -99 SPO 1997 04 08 08 35 333 3.9 -9 679.20 -42.1 -42.0 -42.1 71 -99 SPO 1997 04 08 08 36 332 4.2 -9 679.20 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 08 37 333 4.0 -9 679.20 -42.0 -42.0 -42.1 69 -99 SPO 1997 04 08 08 38 331 4.2 -9 679.20 -42.1 -42.1 -42.1 69 -99 SPO 1997 04 08 08 39 332 4.3 -9 679.20 -42.1 -42.1 -42.1 71 -99 SPO 1997 04 08 08 40 331 4.6 -9 679.20 -42.1 -42.2 -42.2 71 -99 SPO 1997 04 08 08 41 331 4.8 -9 679.10 -42.1 -42.1 -42.2 71 -99 SPO 1997 04 08 08 42 332 4.8 -9 679.10 -42.1 -42.0 -42.2 71 -99 SPO 1997 04 08 08 43 330 4.9 -9 679.10 -42.1 -42.1 -42.2 70 -99 SPO 1997 04 08 08 44 330 5.2 -9 679.10 -42.1 -42.0 -42.2 70 -99 SPO 1997 04 08 08 45 330 5.2 -9 679.10 -42.1 -42.0 -42.2 69 -99 SPO 1997 04 08 08 46 330 5.3 -9 679.10 -42.1 -41.9 -42.2 69 -99 SPO 1997 04 08 08 47 331 5.5 -9 679.00 -42.2 -41.9 -42.2 71 -99 SPO 1997 04 08 08 48 331 5.5 -9 679.00 -42.2 -41.9 -42.2 71 -99 SPO 1997 04 08 08 49 331 5.4 -9 679.00 -42.2 -41.8 -42.2 70 -99 SPO 1997 04 08 08 50 332 5.6 -9 679.00 -42.2 -41.8 -42.3 70 -99 SPO 1997 04 08 08 51 332 5.7 -9 679.00 -42.2 -41.8 -42.3 69 -99 SPO 1997 04 08 08 52 333 5.8 -9 679.00 -42.2 -41.9 -42.3 68 -99 SPO 1997 04 08 08 53 333 5.8 -9 678.90 -42.2 -41.8 -42.3 69 -99 SPO 1997 04 08 08 54 332 5.8 -9 678.90 -42.3 -41.8 -42.3 71 -99 SPO 1997 04 08 08 55 332 5.9 -9 678.90 -42.3 -41.7 -42.4 71 -99 SPO 1997 04 08 08 56 331 5.9 -9 678.90 -42.3 -41.7 -42.3 71 -99 SPO 1997 04 08 08 57 333 5.9 -9 678.90 -42.2 -41.6 -42.3 69 -99 SPO 1997 04 08 08 58 333 5.8 -9 678.90 -42.2 -41.5 -42.4 69 -99 SPO 1997 04 08 08 59 333 6.0 -9 678.90 -42.2 -41.5 -42.4 68 -99 SPO 1997 04 08 09 00 333 6.0 -9 678.90 -42.3 -41.6 -42.4 69 0 SPO 1997 04 08 09 01 333 6.0 -9 678.90 -42.3 -41.6 -42.4 70 -99 SPO 1997 04 08 09 02 333 6.2 -9 678.90 -42.3 -41.6 -42.3 71 -99 SPO 1997 04 08 09 03 333 6.3 -9 678.90 -42.3 -41.5 -42.3 70 -99 SPO 1997 04 08 09 04 334 6.2 -9 678.90 -42.3 -41.5 -42.3 69 -99 SPO 1997 04 08 09 05 335 6.3 -9 678.90 -42.3 -41.4 -42.4 69 -99 SPO 1997 04 08 09 06 334 6.4 -9 678.90 -42.3 -41.3 -42.4 69 -99 SPO 1997 04 08 09 07 334 6.4 -9 678.90 -42.3 -41.2 -42.4 69 -99 SPO 1997 04 08 09 08 334 6.5 -9 678.80 -42.3 -41.1 -42.3 71 -99 SPO 1997 04 08 09 09 335 6.5 -9 678.80 -42.3 -41.0 -42.3 71 -99 SPO 1997 04 08 09 10 335 6.4 -9 678.80 -42.3 -40.9 -42.3 70 -99 SPO 1997 04 08 09 11 335 6.4 -9 678.80 -42.2 -40.9 -42.3 69 -99 SPO 1997 04 08 09 12 336 6.3 -9 678.80 -42.2 -40.9 -42.2 70 -99 SPO 1997 04 08 09 13 338 6.1 -9 678.80 -42.2 -40.8 -42.3 70 -99 SPO 1997 04 08 09 14 338 6.2 -9 678.80 -42.2 -40.9 -42.3 70 -99 SPO 1997 04 08 09 15 339 6.2 -9 678.80 -42.2 -41.0 -42.2 71 -99 SPO 1997 04 08 09 16 340 6.3 -9 678.80 -42.2 -41.0 -42.2 71 -99 SPO 1997 04 08 09 17 340 6.2 -9 678.80 -42.1 -41.1 -42.2 69 -99 SPO 1997 04 08 09 18 339 6.3 -9 678.80 -42.1 -41.0 -42.1 69 -99 SPO 1997 04 08 09 19 340 6.3 -9 678.80 -42.1 -41.1 -42.1 69 -99 SPO 1997 04 08 09 20 340 6.0 -9 678.80 -42.0 -41.1 -42.0 69 -99 SPO 1997 04 08 09 21 340 6.2 -9 678.80 -42.0 -41.2 -42.1 69 -99 SPO 1997 04 08 09 22 339 6.2 -9 678.80 -42.0 -41.2 -42.0 69 -99 SPO 1997 04 08 09 23 339 6.2 -9 678.80 -42.0 -41.3 -42.0 70 -99 SPO 1997 04 08 09 24 339 6.2 -9 678.80 -41.9 -41.4 -42.0 70 -99 SPO 1997 04 08 09 25 339 6.2 -9 678.80 -41.9 -41.4 -42.0 70 -99 SPO 1997 04 08 09 26 338 6.1 -9 678.80 -41.9 -41.5 -42.0 70 -99 SPO 1997 04 08 09 27 338 6.1 -9 678.80 -41.9 -41.5 -42.0 70 -99 SPO 1997 04 08 09 28 339 6.1 -9 678.80 -41.9 -41.5 -42.0 70 -99 SPO 1997 04 08 09 29 339 6.3 -9 678.80 -41.9 -41.4 -42.0 70 -99 SPO 1997 04 08 09 30 339 6.1 -9 678.80 -41.9 -41.4 -42.0 70 -99 SPO 1997 04 08 09 31 339 6.1 -9 678.80 -42.0 -41.4 -42.0 70 -99 SPO 1997 04 08 09 32 339 6.0 -9 678.80 -41.9 -41.4 -42.0 70 -99 SPO 1997 04 08 09 33 340 5.9 -9 678.80 -41.9 -41.5 -42.0 70 -99 SPO 1997 04 08 09 34 338 5.7 -9 678.80 -41.9 -41.6 -42.0 70 -99 SPO 1997 04 08 09 35 339 5.7 -9 678.90 -41.9 -41.6 -42.0 70 -99 SPO 1997 04 08 09 36 340 5.5 -9 678.90 -41.9 -41.6 -41.9 71 -99 SPO 1997 04 08 09 37 341 5.6 -9 678.90 -41.9 -41.6 -41.9 70 -99 SPO 1997 04 08 09 38 341 5.5 -9 678.90 -41.9 -41.6 -41.9 70 -99 SPO 1997 04 08 09 39 339 5.4 -9 678.90 -41.9 -41.7 -41.9 70 -99 SPO 1997 04 08 09 40 340 5.6 -9 678.90 -41.9 -41.7 -41.9 70 -99 SPO 1997 04 08 09 41 339 5.3 -9 678.80 -41.9 -41.7 -41.9 70 -99 SPO 1997 04 08 09 42 339 5.3 -9 678.80 -41.9 -41.7 -41.9 70 -99 SPO 1997 04 08 09 43 339 5.5 -9 678.80 -41.8 -41.7 -41.9 70 -99 SPO 1997 04 08 09 44 339 5.5 -9 678.80 -41.8 -41.6 -41.9 70 -99 SPO 1997 04 08 09 45 340 5.5 -9 678.80 -41.8 -41.6 -41.8 70 -99 SPO 1997 04 08 09 46 340 5.5 -9 678.80 -41.8 -41.6 -41.8 70 -99 SPO 1997 04 08 09 47 339 5.4 -9 678.80 -41.8 -41.6 -41.8 70 -99 SPO 1997 04 08 09 48 338 5.5 -9 678.80 -41.8 -41.6 -41.8 70 -99 SPO 1997 04 08 09 49 337 5.5 -9 678.90 -41.7 -41.5 -41.8 70 -99 SPO 1997 04 08 09 50 336 5.5 -9 678.90 -41.7 -41.5 -41.7 70 -99 SPO 1997 04 08 09 51 336 5.6 -9 678.80 -41.7 -41.4 -41.7 70 -99 SPO 1997 04 08 09 52 336 5.6 -9 678.80 -41.7 -41.4 -41.7 70 -99 SPO 1997 04 08 09 53 336 5.7 -9 678.80 -41.7 -41.4 -41.7 70 -99 SPO 1997 04 08 09 54 336 5.6 -9 678.80 -41.6 -41.3 -41.7 70 -99 SPO 1997 04 08 09 55 337 5.5 -9 678.80 -41.6 -41.3 -41.7 71 -99 SPO 1997 04 08 09 56 335 5.5 -9 678.80 -41.6 -41.3 -41.6 72 -99 SPO 1997 04 08 09 57 336 5.4 -9 678.80 -41.6 -41.4 -41.7 72 -99 SPO 1997 04 08 09 58 336 5.4 -9 678.80 -41.6 -41.4 -41.7 71 -99 SPO 1997 04 08 09 59 343 5.5 -9 678.80 -41.6 -41.2 -41.7 70 -99 SPO 1997 04 08 10 00 342 5.6 -9 678.80 -41.6 -41.3 -41.7 69 0 SPO 1997 04 08 10 01 343 5.5 -9 678.80 -41.6 -41.3 -41.7 69 -99 SPO 1997 04 08 10 02 346 5.6 -9 678.80 -41.6 -41.2 -41.7 69 -99 SPO 1997 04 08 10 03 343 5.3 -9 678.70 -41.7 -41.2 -41.7 70 -99 SPO 1997 04 08 10 04 339 5.0 -9 678.70 -41.7 -41.3 -41.7 71 -99 SPO 1997 04 08 10 05 339 5.0 -9 678.70 -41.7 -41.4 -41.7 70 -99 SPO 1997 04 08 10 06 341 5.2 -9 678.70 -41.6 -41.4 -41.6 70 -99 SPO 1997 04 08 10 07 345 5.3 -9 678.70 -41.6 -41.4 -41.6 70 -99 SPO 1997 04 08 10 08 345 5.2 -9 678.70 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 09 342 4.9 -9 678.70 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 10 342 4.7 -9 678.70 -41.5 -41.5 -41.6 70 -99 SPO 1997 04 08 10 11 341 4.8 -9 678.70 -41.5 -41.4 -41.6 71 -99 SPO 1997 04 08 10 12 340 4.8 -9 678.70 -41.5 -41.6 -41.5 71 -99 SPO 1997 04 08 10 13 342 4.8 -9 678.70 -41.5 -41.6 -41.6 70 -99 SPO 1997 04 08 10 14 343 5.1 -9 678.60 -41.5 -41.6 -41.6 70 -99 SPO 1997 04 08 10 15 343 5.3 -9 678.60 -41.5 -41.5 -41.6 70 -99 SPO 1997 04 08 10 16 342 5.2 -9 678.60 -41.5 -41.5 -41.5 70 -99 SPO 1997 04 08 10 17 342 5.2 -9 678.60 -41.5 -41.5 -41.5 70 -99 SPO 1997 04 08 10 18 343 5.2 -9 678.60 -41.5 -41.5 -41.6 70 -99 SPO 1997 04 08 10 19 342 5.4 -9 678.60 -41.5 -41.5 -41.6 70 -99 SPO 1997 04 08 10 20 344 5.3 -9 678.60 -41.5 -41.5 -41.6 70 -99 SPO 1997 04 08 10 21 343 5.3 -9 678.60 -41.5 -41.5 -41.5 71 -99 SPO 1997 04 08 10 22 337 5.1 -9 678.60 -41.5 -41.5 -41.5 71 -99 SPO 1997 04 08 10 23 336 5.2 -9 678.60 -41.5 -41.5 -41.5 71 -99 SPO 1997 04 08 10 24 339 5.1 -9 678.60 -41.4 -41.5 -41.5 70 -99 SPO 1997 04 08 10 25 341 5.2 -9 678.60 -41.5 -41.4 -41.5 70 -99 SPO 1997 04 08 10 26 342 5.2 -9 678.60 -41.5 -41.4 -41.5 71 -99 SPO 1997 04 08 10 27 341 5.2 -9 678.60 -41.5 -41.4 -41.5 70 -99 SPO 1997 04 08 10 28 341 5.3 -9 678.60 -41.4 -41.5 -41.5 69 -99 SPO 1997 04 08 10 29 343 5.1 -9 678.60 -41.4 -41.5 -41.5 70 -99 SPO 1997 04 08 10 30 342 5.3 -9 678.50 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 31 343 5.7 -9 678.50 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 32 343 5.6 -9 678.50 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 33 341 5.3 -9 678.50 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 34 338 5.4 -9 678.50 -41.5 -41.4 -41.5 70 -99 SPO 1997 04 08 10 35 338 5.5 -9 678.50 -41.4 -41.4 -41.5 70 -99 SPO 1997 04 08 10 36 338 5.5 -9 678.50 -41.4 -41.4 -41.5 71 -99 SPO 1997 04 08 10 37 339 5.4 -9 678.50 -41.4 -41.5 -41.5 70 -99 SPO 1997 04 08 10 38 342 5.7 -9 678.40 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 39 337 5.3 -9 678.40 -41.5 -41.4 -41.6 70 -99 SPO 1997 04 08 10 40 340 5.5 -9 678.40 -41.5 -41.5 -41.6 70 -99 SPO 1997 04 08 10 41 341 5.7 -9 678.40 -41.6 -41.4 -41.7 70 -99 SPO 1997 04 08 10 42 341 5.6 -9 678.40 -41.6 -41.5 -41.7 70 -99 SPO 1997 04 08 10 43 341 5.9 -9 678.40 -41.6 -41.5 -41.7 69 -99 SPO 1997 04 08 10 44 338 5.7 -9 678.40 -41.6 -41.5 -41.7 69 -99 SPO 1997 04 08 10 45 336 5.8 -9 678.40 -41.6 -41.7 -41.8 70 -99 SPO 1997 04 08 10 46 340 5.8 -9 678.40 -41.7 -41.4 -41.8 70 -99 SPO 1997 04 08 10 47 338 6.0 -9 678.40 -41.7 -41.2 -41.8 71 -99 SPO 1997 04 08 10 48 335 6.0 -9 678.40 -41.7 -41.4 -41.8 70 -99 SPO 1997 04 08 10 49 337 6.0 -9 678.40 -41.8 -41.5 -41.8 70 -99 SPO 1997 04 08 10 50 337 5.9 -9 678.40 -41.8 -41.6 -41.8 70 -99 SPO 1997 04 08 10 51 339 6.0 -9 678.40 -41.8 -41.6 -41.8 71 -99 SPO 1997 04 08 10 52 340 6.2 -9 678.40 -41.8 -41.6 -41.8 71 -99 SPO 1997 04 08 10 53 341 6.0 -9 678.30 -41.8 -41.6 -41.9 71 -99 SPO 1997 04 08 10 54 342 6.0 -9 678.30 -41.8 -41.7 -41.9 70 -99 SPO 1997 04 08 10 55 341 5.9 -9 678.30 -41.8 -41.8 -41.9 70 -99 SPO 1997 04 08 10 56 342 5.8 -9 678.30 -41.8 -41.8 -41.9 70 -99 SPO 1997 04 08 10 57 342 5.5 -9 678.30 -41.9 -41.9 -41.9 70 -99 SPO 1997 04 08 10 58 343 5.8 -9 678.40 -41.9 -41.9 -42.0 70 -99 SPO 1997 04 08 10 59 344 5.8 -9 678.40 -41.9 -41.9 -42.0 70 -99 SPO 1997 04 08 11 00 342 5.7 -9 678.40 -42.0 -41.9 -42.0 70 0 SPO 1997 04 08 11 01 342 5.4 -9 678.40 -42.0 -42.0 -42.0 70 -99 SPO 1997 04 08 11 02 342 5.3 -9 678.40 -42.0 -42.0 -42.0 70 -99 SPO 1997 04 08 11 03 342 5.4 -9 678.40 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 11 04 342 5.5 -9 678.30 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 11 05 342 5.7 -9 678.30 -42.0 -42.0 -42.1 70 -99 SPO 1997 04 08 11 06 341 5.6 -9 678.30 -42.0 -42.0 -42.1 69 -99 SPO 1997 04 08 11 07 340 5.7 -9 678.30 -42.1 -42.0 -42.2 70 -99 SPO 1997 04 08 11 08 341 5.6 -9 678.30 -42.1 -42.0 -42.2 70 -99 SPO 1997 04 08 11 09 341 5.8 -9 678.30 -42.1 -42.0 -42.2 69 -99 SPO 1997 04 08 11 10 339 5.9 -9 678.30 -42.2 -41.8 -42.2 69 -99 SPO 1997 04 08 11 11 338 6.1 -9 678.30 -42.1 -41.6 -42.2 69 -99 SPO 1997 04 08 11 12 338 6.2 -9 678.20 -42.0 -41.4 -42.2 68 -99 SPO 1997 04 08 11 13 337 6.4 -9 678.20 -42.1 -41.4 -42.1 69 -99 SPO 1997 04 08 11 14 337 6.4 -9 678.20 -42.1 -41.4 -42.1 69 -99 SPO 1997 04 08 11 15 337 6.4 -9 678.20 -42.1 -41.4 -42.1 71 -99 SPO 1997 04 08 11 16 337 6.4 -9 678.20 -42.1 -41.4 -42.1 71 -99 SPO 1997 04 08 11 17 338 6.6 -9 678.20 -42.1 -41.5 -42.1 71 -99 SPO 1997 04 08 11 18 339 6.3 -9 678.20 -42.1 -41.5 -42.2 71 -99 SPO 1997 04 08 11 19 340 6.3 -9 678.20 -42.1 -41.5 -42.2 69 -99 SPO 1997 04 08 11 20 339 6.3 -9 678.20 -42.2 -41.5 -42.3 70 -99 SPO 1997 04 08 11 21 339 6.3 -9 678.20 -42.2 -41.6 -42.4 69 -99 SPO 1997 04 08 11 22 339 6.5 -9 678.20 -42.3 -41.6 -42.4 71 -99 SPO 1997 04 08 11 23 339 6.5 -9 678.20 -42.3 -41.5 -42.4 69 -99 SPO 1997 04 08 11 24 339 6.5 -9 678.20 -42.3 -41.4 -42.4 68 -99 SPO 1997 04 08 11 25 339 6.7 -9 678.20 -42.3 -41.2 -42.4 68 -99 SPO 1997 04 08 11 26 340 6.6 -9 678.20 -42.4 -41.2 -42.4 69 -99 SPO 1997 04 08 11 27 339 6.5 -9 678.20 -42.4 -41.1 -42.4 69 -99 SPO 1997 04 08 11 28 339 6.4 -9 678.20 -42.4 -41.1 -42.5 69 -99 SPO 1997 04 08 11 29 340 6.2 -9 678.20 -42.4 -41.2 -42.5 69 -99 SPO 1997 04 08 11 30 339 6.2 -9 678.20 -42.5 -41.2 -42.5 70 -99 SPO 1997 04 08 11 31 339 6.1 -9 678.20 -42.4 -41.2 -42.6 69 -99 SPO 1997 04 08 11 32 340 6.1 -9 678.20 -42.4 -41.1 -42.6 69 -99 SPO 1997 04 08 11 33 340 6.0 -9 678.20 -42.5 -41.1 -42.6 69 -99 SPO 1997 04 08 11 34 342 5.8 -9 678.20 -42.5 -41.2 -42.6 68 -99 SPO 1997 04 08 11 35 342 5.7 -9 678.20 -42.5 -41.4 -42.6 68 -99 SPO 1997 04 08 11 36 343 5.6 -9 678.20 -42.6 -41.6 -42.6 69 -99 SPO 1997 04 08 11 37 343 5.5 -9 678.20 -42.6 -41.7 -42.7 69 -99 SPO 1997 04 08 11 38 342 5.3 -9 678.30 -42.6 -41.7 -42.7 68 -99 SPO 1997 04 08 11 39 343 5.2 -9 678.30 -42.6 -41.8 -42.7 67 -99 SPO 1997 04 08 11 40 343 4.9 -9 678.30 -42.6 -41.8 -42.7 67 -99 SPO 1997 04 08 11 41 344 4.7 -9 678.30 -42.6 -41.9 -42.7 68 -99 SPO 1997 04 08 11 42 344 4.5 -9 678.40 -42.6 -42.0 -42.7 69 -99 SPO 1997 04 08 11 43 345 4.3 -9 678.40 -42.6 -42.2 -42.7 69 -99 SPO 1997 04 08 11 44 347 4.2 -9 678.40 -42.6 -42.2 -42.7 69 -99 SPO 1997 04 08 11 45 348 4.1 -9 678.40 -42.6 -42.4 -42.7 69 -99 SPO 1997 04 08 11 46 349 4.1 -9 678.40 -42.7 -42.4 -42.7 69 -99 SPO 1997 04 08 11 47 349 3.9 -9 678.40 -42.7 -42.5 -42.7 69 -99 SPO 1997 04 08 11 48 347 3.8 -9 678.40 -42.7 -42.6 -42.7 69 -99 SPO 1997 04 08 11 49 349 3.9 -9 678.40 -42.7 -42.5 -42.7 70 -99 SPO 1997 04 08 11 50 349 4.2 -9 678.40 -42.7 -42.5 -42.8 70 -99 SPO 1997 04 08 11 51 349 4.4 -9 678.40 -42.7 -42.4 -42.7 69 -99 SPO 1997 04 08 11 52 348 4.2 -9 678.40 -42.6 -42.3 -42.7 68 -99 SPO 1997 04 08 11 53 346 4.4 -9 678.40 -42.6 -42.2 -42.7 67 -99 SPO 1997 04 08 11 54 346 4.4 -9 678.40 -42.6 -42.2 -42.7 67 -99 SPO 1997 04 08 11 55 346 4.5 -9 678.40 -42.6 -42.2 -42.7 69 -99 SPO 1997 04 08 11 56 345 4.5 -9 678.40 -42.6 -42.1 -42.7 68 -99 SPO 1997 04 08 11 57 347 4.6 -9 678.40 -42.6 -42.1 -42.7 68 -99 SPO 1997 04 08 11 58 347 4.6 -9 678.40 -42.7 -42.2 -42.7 69 -99 SPO 1997 04 08 11 59 348 4.5 -9 678.40 -42.6 -42.3 -42.7 68 -99 SPO 1997 04 08 12 00 349 4.3 -9 678.40 -42.7 -42.4 -42.7 69 0 SPO 1997 04 08 12 01 349 4.2 -9 678.40 -42.7 -42.4 -42.8 69 -99 SPO 1997 04 08 12 02 349 4.2 -9 678.40 -42.7 -42.5 -42.8 69 -99 SPO 1997 04 08 12 03 348 4.1 -9 678.40 -42.7 -42.5 -42.8 69 -99 SPO 1997 04 08 12 04 348 4.2 -9 678.40 -42.7 -42.5 -42.8 69 -99 SPO 1997 04 08 12 05 347 4.1 -9 678.40 -42.8 -42.4 -42.8 69 -99 SPO 1997 04 08 12 06 347 4.1 -9 678.40 -42.8 -42.4 -42.8 69 -99 SPO 1997 04 08 12 07 349 4.1 -9 678.30 -42.7 -42.4 -42.8 68 -99 SPO 1997 04 08 12 08 350 4.0 -9 678.40 -42.7 -42.4 -42.7 68 -99 SPO 1997 04 08 12 09 352 3.9 -9 678.30 -42.7 -42.4 -42.8 68 -99 SPO 1997 04 08 12 10 353 3.7 -9 678.40 -42.7 -42.4 -42.8 69 -99 SPO 1997 04 08 12 11 355 3.4 -9 678.40 -42.7 -42.5 -42.8 69 -99 SPO 1997 04 08 12 12 357 3.4 -9 678.40 -42.8 -42.5 -42.8 69 -99 SPO 1997 04 08 12 13 355 3.5 -9 678.30 -42.8 -42.6 -42.9 69 -99 SPO 1997 04 08 12 14 357 3.6 -9 678.30 -42.7 -42.7 -42.9 69 -99 SPO 1997 04 08 12 15 357 3.6 -9 678.30 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 12 16 356 3.4 -9 678.30 -42.8 -42.8 -42.9 68 -99 SPO 1997 04 08 12 17 359 3.4 -9 678.30 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 12 18 0 3.2 -9 678.30 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 12 19 1 3.3 -9 678.30 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 12 20 2 3.3 -9 678.30 -42.9 -42.9 -42.9 69 -99 SPO 1997 04 08 12 21 359 3.5 -9 678.30 -42.9 -42.9 -42.9 69 -99 SPO 1997 04 08 12 22 358 3.7 -9 678.30 -42.9 -42.9 -42.9 69 -99 SPO 1997 04 08 12 23 357 3.7 -9 678.30 -42.9 -42.8 -42.9 69 -99 SPO 1997 04 08 12 24 356 3.7 -9 678.30 -42.9 -42.8 -42.9 69 -99 SPO 1997 04 08 12 25 354 3.9 -9 678.30 -42.9 -42.8 -42.9 69 -99 SPO 1997 04 08 12 26 352 3.9 -9 678.30 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 12 27 350 4.0 -9 678.30 -42.9 -42.6 -42.9 69 -99 SPO 1997 04 08 12 28 348 3.9 -9 678.30 -42.9 -42.6 -42.9 69 -99 SPO 1997 04 08 12 29 347 3.9 -9 678.30 -42.9 -42.5 -42.9 69 -99 SPO 1997 04 08 12 30 346 3.7 -9 678.20 -42.9 -42.6 -42.9 70 -99 SPO 1997 04 08 12 31 348 4.1 -9 678.20 -42.9 -42.5 -43.0 69 -99 SPO 1997 04 08 12 32 350 4.1 -9 678.20 -42.9 -42.5 -42.9 69 -99 SPO 1997 04 08 12 33 352 4.0 -9 678.20 -42.9 -42.6 -43.0 69 -99 SPO 1997 04 08 12 34 354 3.8 -9 678.20 -42.9 -42.6 -43.0 69 -99 SPO 1997 04 08 12 35 357 3.6 -9 678.20 -42.8 -42.7 -43.0 68 -99 SPO 1997 04 08 12 36 358 3.6 -9 678.20 -42.9 -42.7 -43.0 69 -99 SPO 1997 04 08 12 37 0 3.4 -9 678.20 -42.9 -42.7 -43.0 69 -99 SPO 1997 04 08 12 38 5 3.5 -9 678.20 -43.0 -42.7 -43.1 69 -99 SPO 1997 04 08 12 39 8 3.3 -9 678.20 -43.0 -42.7 -43.0 69 -99 SPO 1997 04 08 12 40 10 3.1 -9 678.20 -43.0 -42.7 -43.1 68 -99 SPO 1997 04 08 12 41 12 3.0 -9 678.20 -43.0 -42.8 -43.1 68 -99 SPO 1997 04 08 12 42 16 3.0 -9 678.20 -43.0 -42.9 -43.1 68 -99 SPO 1997 04 08 12 43 18 3.0 -9 678.20 -43.0 -43.0 -43.1 69 -99 SPO 1997 04 08 12 44 18 2.9 -9 678.20 -43.1 -43.1 -43.1 69 -99 SPO 1997 04 08 12 45 17 2.9 -9 678.20 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 12 46 15 2.6 -9 678.20 -43.1 -43.1 -43.2 69 -99 SPO 1997 04 08 12 47 12 2.7 -9 678.20 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 12 48 9 2.8 -9 678.20 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 12 49 7 3.1 -9 678.20 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 12 50 5 3.5 -9 678.20 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 12 51 3 3.5 -9 678.10 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 12 52 2 3.8 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 12 53 0 3.9 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 12 54 359 4.0 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 12 55 359 4.2 -9 678.10 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 12 56 359 4.1 -9 678.10 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 12 57 359 4.3 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 12 58 1 4.2 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 12 59 360 4.1 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 13 00 359 3.9 -9 678.10 -43.1 -43.1 -43.2 69 0 SPO 1997 04 08 13 01 358 3.7 -9 678.10 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 13 02 358 3.5 -9 678.10 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 13 03 359 3.5 -9 678.10 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 13 04 358 3.7 -9 678.10 -43.1 -43.2 -43.2 66 -99 SPO 1997 04 08 13 05 357 3.6 -9 678.10 -43.2 -43.3 -43.2 68 -99 SPO 1997 04 08 13 06 357 3.9 -9 678.10 -43.2 -43.3 -43.2 68 -99 SPO 1997 04 08 13 07 357 3.9 -9 678.10 -43.2 -43.3 -43.2 68 -99 SPO 1997 04 08 13 08 356 3.8 -9 678.10 -43.2 -43.2 -43.3 69 -99 SPO 1997 04 08 13 09 353 3.9 -9 678.10 -43.2 -43.2 -43.3 68 -99 SPO 1997 04 08 13 10 353 4.0 -9 678.00 -43.2 -43.1 -43.3 68 -99 SPO 1997 04 08 13 11 354 4.1 -9 678.00 -43.2 -43.1 -43.3 69 -99 SPO 1997 04 08 13 12 354 4.3 -9 678.00 -43.2 -43.1 -43.3 69 -99 SPO 1997 04 08 13 13 354 4.4 -9 678.00 -43.2 -43.0 -43.3 69 -99 SPO 1997 04 08 13 14 354 4.5 -9 678.00 -43.2 -43.0 -43.3 69 -99 SPO 1997 04 08 13 15 354 4.6 -9 678.00 -43.2 -43.0 -43.3 69 -99 SPO 1997 04 08 13 16 354 4.5 -9 678.00 -43.3 -43.0 -43.3 69 -99 SPO 1997 04 08 13 17 355 4.2 -9 678.00 -43.2 -43.0 -43.2 68 -99 SPO 1997 04 08 13 18 355 4.3 -9 678.00 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 13 19 354 4.3 -9 678.00 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 13 20 355 4.4 -9 678.00 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 13 21 356 4.2 -9 678.00 -43.2 -43.0 -43.2 68 -99 SPO 1997 04 08 13 22 358 4.3 -9 678.00 -43.2 -42.9 -43.3 68 -99 SPO 1997 04 08 13 23 357 4.1 -9 678.00 -43.2 -43.0 -43.2 68 -99 SPO 1997 04 08 13 24 358 4.3 -9 678.00 -43.2 -43.0 -43.2 68 -99 SPO 1997 04 08 13 25 0 4.2 -9 678.00 -43.2 -43.0 -43.2 68 -99 SPO 1997 04 08 13 26 1 4.0 -9 678.00 -43.2 -43.1 -43.2 69 -99 SPO 1997 04 08 13 27 2 4.0 -9 678.00 -43.2 -43.1 -43.2 69 -99 SPO 1997 04 08 13 28 4 4.0 -9 678.00 -43.2 -43.2 -43.2 69 -99 SPO 1997 04 08 13 29 6 3.7 -9 678.00 -43.2 -43.2 -43.2 68 -99 SPO 1997 04 08 13 30 6 3.7 -9 678.00 -43.2 -43.2 -43.2 68 -99 SPO 1997 04 08 13 31 7 3.7 -9 678.00 -43.2 -43.2 -43.2 68 -99 SPO 1997 04 08 13 32 7 3.7 -9 678.00 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 13 33 6 3.5 -9 678.00 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 13 34 7 3.5 -9 678.00 -43.2 -43.2 -43.2 68 -99 SPO 1997 04 08 13 35 7 3.6 -9 677.90 -43.2 -43.2 -43.2 69 -99 SPO 1997 04 08 13 36 7 3.5 -9 677.90 -43.2 -43.2 -43.2 69 -99 SPO 1997 04 08 13 37 6 3.5 -9 678.00 -43.2 -43.2 -43.2 68 -99 SPO 1997 04 08 13 38 7 3.5 -9 677.90 -43.2 -43.2 -43.2 68 -99 SPO 1997 04 08 13 39 6 3.5 -9 677.90 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 13 40 6 3.7 -9 677.90 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 13 41 4 3.6 -9 677.90 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 13 42 5 3.7 -9 677.90 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 13 43 6 3.8 -9 677.90 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 13 44 5 3.8 -9 677.90 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 13 45 6 4.0 -9 677.80 -43.1 -43.0 -43.2 67 -99 SPO 1997 04 08 13 46 6 4.1 -9 677.80 -43.1 -43.0 -43.2 67 -99 SPO 1997 04 08 13 47 5 4.2 -9 677.80 -43.1 -43.0 -43.2 67 -99 SPO 1997 04 08 13 48 5 4.3 -9 677.80 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 13 49 4 4.4 -9 677.80 -43.1 -43.1 -43.2 69 -99 SPO 1997 04 08 13 50 3 4.6 -9 677.80 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 13 51 2 4.6 -9 677.80 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 13 52 2 4.6 -9 677.80 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 13 53 360 4.6 -9 677.80 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 13 54 358 4.7 -9 677.80 -43.1 -42.7 -43.2 68 -99 SPO 1997 04 08 13 55 357 4.8 -9 677.80 -43.1 -42.7 -43.2 68 -99 SPO 1997 04 08 13 56 356 4.7 -9 677.80 -43.1 -42.6 -43.1 68 -99 SPO 1997 04 08 13 57 356 5.0 -9 677.80 -43.1 -42.6 -43.1 69 -99 SPO 1997 04 08 13 58 355 4.8 -9 677.80 -43.1 -42.6 -43.1 69 -99 SPO 1997 04 08 13 59 354 4.7 -9 677.80 -43.1 -42.5 -43.1 69 -99 SPO 1997 04 08 14 00 354 4.6 -9 677.80 -43.1 -42.4 -43.1 69 0 SPO 1997 04 08 14 01 354 4.4 -9 677.80 -43.0 -42.4 -43.1 69 -99 SPO 1997 04 08 14 02 354 4.6 -9 677.80 -43.0 -42.5 -43.1 68 -99 SPO 1997 04 08 14 03 355 4.5 -9 677.80 -42.9 -42.5 -43.1 68 -99 SPO 1997 04 08 14 04 357 4.7 -9 677.80 -43.0 -42.4 -43.1 69 -99 SPO 1997 04 08 14 05 356 4.7 -9 677.70 -43.0 -42.4 -43.1 69 -99 SPO 1997 04 08 14 06 356 4.7 -9 677.70 -43.0 -42.5 -43.1 69 -99 SPO 1997 04 08 14 07 356 4.6 -9 677.70 -43.0 -42.5 -43.1 69 -99 SPO 1997 04 08 14 08 356 4.7 -9 677.70 -43.0 -42.5 -43.1 69 -99 SPO 1997 04 08 14 09 356 4.6 -9 677.70 -43.0 -42.5 -43.0 69 -99 SPO 1997 04 08 14 10 356 4.6 -9 677.70 -43.0 -42.6 -43.0 69 -99 SPO 1997 04 08 14 11 355 4.7 -9 677.70 -43.0 -42.6 -43.0 69 -99 SPO 1997 04 08 14 12 356 4.7 -9 677.70 -43.0 -42.6 -43.0 69 -99 SPO 1997 04 08 14 13 356 4.6 -9 677.70 -42.9 -42.6 -43.0 69 -99 SPO 1997 04 08 14 14 356 4.8 -9 677.70 -42.9 -42.6 -43.0 69 -99 SPO 1997 04 08 14 15 356 4.8 -9 677.70 -42.9 -42.6 -43.0 69 -99 SPO 1997 04 08 14 16 355 4.8 -9 677.70 -42.9 -42.7 -43.0 69 -99 SPO 1997 04 08 14 17 354 4.7 -9 677.70 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 18 355 4.6 -9 677.70 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 19 355 4.7 -9 677.70 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 20 355 4.8 -9 677.70 -42.9 -42.7 -42.9 69 -99 SPO 1997 04 08 14 21 353 4.7 -9 677.80 -42.9 -42.7 -42.9 69 -99 SPO 1997 04 08 14 22 353 4.7 -9 677.80 -42.9 -42.8 -42.9 69 -99 SPO 1997 04 08 14 23 353 4.5 -9 677.80 -42.9 -42.8 -42.9 69 -99 SPO 1997 04 08 14 24 353 4.4 -9 677.70 -42.8 -42.7 -42.9 69 -99 SPO 1997 04 08 14 25 353 4.6 -9 677.70 -42.7 -42.6 -42.9 68 -99 SPO 1997 04 08 14 26 354 4.7 -9 677.70 -42.7 -42.6 -42.9 68 -99 SPO 1997 04 08 14 27 353 4.5 -9 677.70 -42.8 -42.7 -42.9 69 -99 SPO 1997 04 08 14 28 352 4.7 -9 677.70 -42.8 -42.7 -42.9 69 -99 SPO 1997 04 08 14 29 353 4.6 -9 677.70 -42.8 -42.7 -42.9 68 -99 SPO 1997 04 08 14 30 354 4.4 -9 677.70 -42.8 -42.7 -42.9 68 -99 SPO 1997 04 08 14 31 357 4.5 -9 677.70 -42.8 -42.8 -42.9 68 -99 SPO 1997 04 08 14 32 359 4.6 -9 677.70 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 14 33 358 4.4 -9 677.80 -42.8 -42.8 -42.9 69 -99 SPO 1997 04 08 14 34 359 4.3 -9 677.80 -42.8 -42.9 -42.9 69 -99 SPO 1997 04 08 14 35 1 4.7 -9 677.80 -42.8 -42.9 -43.0 69 -99 SPO 1997 04 08 14 36 0 4.5 -9 677.80 -42.9 -42.9 -43.0 69 -99 SPO 1997 04 08 14 37 1 4.5 -9 677.80 -42.9 -42.9 -43.0 69 -99 SPO 1997 04 08 14 38 1 4.6 -9 677.80 -42.8 -42.9 -42.9 69 -99 SPO 1997 04 08 14 39 0 4.5 -9 677.80 -42.9 -42.9 -43.0 69 -99 SPO 1997 04 08 14 40 359 4.5 -9 677.80 -42.9 -42.9 -42.9 69 -99 SPO 1997 04 08 14 41 359 4.6 -9 677.70 -42.9 -42.9 -42.9 69 -99 SPO 1997 04 08 14 42 358 4.5 -9 677.70 -42.9 -42.8 -42.9 69 -99 SPO 1997 04 08 14 43 356 4.6 -9 677.80 -42.9 -42.8 -43.0 68 -99 SPO 1997 04 08 14 44 356 4.7 -9 677.80 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 45 355 4.5 -9 677.70 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 46 354 4.7 -9 677.70 -43.0 -42.8 -43.0 69 -99 SPO 1997 04 08 14 47 355 4.7 -9 677.70 -42.8 -42.8 -43.0 68 -99 SPO 1997 04 08 14 48 353 4.7 -9 677.70 -42.8 -42.8 -43.0 68 -99 SPO 1997 04 08 14 49 353 4.8 -9 677.70 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 50 353 5.0 -9 677.70 -42.9 -42.8 -43.0 69 -99 SPO 1997 04 08 14 51 352 5.0 -9 677.70 -42.9 -42.7 -43.0 69 -99 SPO 1997 04 08 14 52 353 5.1 -9 677.60 -42.9 -42.7 -43.0 68 -99 SPO 1997 04 08 14 53 352 5.2 -9 677.70 -42.9 -42.7 -43.0 68 -99 SPO 1997 04 08 14 54 352 5.3 -9 677.60 -43.0 -42.8 -43.0 69 -99 SPO 1997 04 08 14 55 354 5.3 -9 677.60 -43.0 -42.8 -43.0 69 -99 SPO 1997 04 08 14 56 355 5.3 -9 677.60 -43.0 -42.8 -43.0 69 -99 SPO 1997 04 08 14 57 356 5.1 -9 677.60 -43.0 -42.8 -43.1 69 -99 SPO 1997 04 08 14 58 358 5.2 -9 677.60 -43.0 -42.8 -43.1 69 -99 SPO 1997 04 08 14 59 359 5.3 -9 677.60 -43.0 -42.9 -43.1 69 -99 SPO 1997 04 08 15 00 360 5.0 -9 677.60 -43.0 -42.9 -43.1 69 0 SPO 1997 04 08 15 01 0 5.2 -9 677.60 -43.0 -42.9 -43.1 69 -99 SPO 1997 04 08 15 02 1 5.2 -9 677.60 -43.0 -43.0 -43.1 69 -99 SPO 1997 04 08 15 03 360 5.3 -9 677.60 -43.0 -42.9 -43.1 69 -99 SPO 1997 04 08 15 04 360 5.5 -9 677.60 -43.0 -42.9 -43.1 69 -99 SPO 1997 04 08 15 05 359 5.6 -9 677.60 -43.1 -42.9 -43.1 69 -99 SPO 1997 04 08 15 06 358 5.6 -9 677.60 -43.1 -42.8 -43.1 69 -99 SPO 1997 04 08 15 07 359 5.7 -9 677.60 -43.0 -42.6 -43.1 69 -99 SPO 1997 04 08 15 08 358 5.6 -9 677.60 -43.0 -42.6 -43.1 69 -99 SPO 1997 04 08 15 09 357 5.5 -9 677.60 -42.9 -42.7 -43.1 68 -99 SPO 1997 04 08 15 10 356 5.6 -9 677.60 -43.0 -42.7 -43.1 69 -99 SPO 1997 04 08 15 11 355 5.5 -9 677.60 -43.0 -42.8 -43.1 68 -99 SPO 1997 04 08 15 12 356 5.5 -9 677.60 -43.0 -42.6 -43.1 69 -99 SPO 1997 04 08 15 13 356 5.5 -9 677.60 -43.0 -42.5 -43.1 69 -99 SPO 1997 04 08 15 14 356 5.5 -9 677.60 -43.0 -42.5 -43.1 69 -99 SPO 1997 04 08 15 15 354 5.7 -9 677.60 -43.0 -42.6 -43.0 69 -99 SPO 1997 04 08 15 16 354 5.7 -9 677.60 -43.0 -42.6 -43.1 70 -99 SPO 1997 04 08 15 17 354 5.6 -9 677.60 -43.0 -42.6 -43.1 69 -99 SPO 1997 04 08 15 18 354 6.0 -9 677.60 -43.0 -42.3 -43.1 69 -99 SPO 1997 04 08 15 19 353 6.0 -9 677.60 -43.0 -42.1 -43.0 69 -99 SPO 1997 04 08 15 20 351 5.9 -9 677.60 -43.0 -42.2 -43.0 69 -99 SPO 1997 04 08 15 21 350 6.0 -9 677.60 -42.9 -42.1 -43.0 69 -99 SPO 1997 04 08 15 22 349 6.0 -9 677.60 -42.9 -41.8 -43.0 68 -99 SPO 1997 04 08 15 23 347 5.8 -9 677.60 -42.9 -41.9 -42.8 69 -99 SPO 1997 04 08 15 24 347 5.7 -9 677.60 -42.8 -42.0 -42.8 69 -99 SPO 1997 04 08 15 25 347 5.6 -9 677.60 -42.8 -42.0 -42.9 69 -99 SPO 1997 04 08 15 26 348 5.3 -9 677.50 -42.8 -42.1 -42.9 69 -99 SPO 1997 04 08 15 27 346 4.9 -9 677.60 -42.8 -42.0 -42.9 69 -99 SPO 1997 04 08 15 28 347 4.9 -9 677.60 -42.9 -42.0 -42.9 69 -99 SPO 1997 04 08 15 29 347 4.8 -9 677.60 -42.9 -42.2 -42.9 69 -99 SPO 1997 04 08 15 30 345 4.4 -9 677.60 -42.8 -42.4 -42.9 69 -99 SPO 1997 04 08 15 31 347 4.5 -9 677.60 -42.8 -42.3 -42.9 69 -99 SPO 1997 04 08 15 32 347 4.2 -9 677.60 -42.8 -42.4 -42.9 69 -99 SPO 1997 04 08 15 33 345 4.1 -9 677.60 -42.8 -42.4 -42.9 69 -99 SPO 1997 04 08 15 34 341 4.0 -9 677.60 -42.8 -42.4 -42.9 69 -99 SPO 1997 04 08 15 35 342 4.1 -9 677.60 -42.9 -42.4 -43.0 69 -99 SPO 1997 04 08 15 36 340 4.4 -9 677.60 -42.8 -42.2 -42.9 68 -99 SPO 1997 04 08 15 37 340 4.3 -9 677.60 -42.9 -42.3 -42.9 69 -99 SPO 1997 04 08 15 38 341 4.8 -9 677.50 -42.8 -42.0 -42.9 69 -99 SPO 1997 04 08 15 39 342 5.1 -9 677.50 -42.8 -41.9 -42.8 69 -99 SPO 1997 04 08 15 40 341 5.1 -9 677.50 -42.8 -41.9 -42.9 69 -99 SPO 1997 04 08 15 41 343 5.2 -9 677.50 -42.8 -41.8 -42.8 69 -99 SPO 1997 04 08 15 42 345 5.2 -9 677.50 -42.8 -41.8 -42.9 69 -99 SPO 1997 04 08 15 43 346 5.0 -9 677.50 -42.8 -42.1 -42.9 69 -99 SPO 1997 04 08 15 44 346 4.8 -9 677.50 -42.9 -42.3 -43.0 69 -99 SPO 1997 04 08 15 45 346 5.0 -9 677.50 -43.0 -42.4 -43.1 70 -99 SPO 1997 04 08 15 46 347 5.0 -9 677.50 -43.0 -42.4 -43.0 71 -99 SPO 1997 04 08 15 47 347 4.8 -9 677.50 -43.0 -42.4 -43.0 69 -99 SPO 1997 04 08 15 48 346 4.6 -9 677.50 -43.0 -42.4 -43.0 69 -99 SPO 1997 04 08 15 49 349 4.6 -9 677.50 -43.0 -42.7 -43.0 69 -99 SPO 1997 04 08 15 50 348 4.2 -9 677.50 -43.0 -42.8 -43.1 69 -99 SPO 1997 04 08 15 51 348 4.4 -9 677.50 -43.0 -42.8 -43.1 68 -99 SPO 1997 04 08 15 52 347 4.4 -9 677.50 -42.9 -42.9 -43.1 67 -99 SPO 1997 04 08 15 53 349 4.5 -9 677.50 -43.0 -42.9 -43.1 68 -99 SPO 1997 04 08 15 54 351 4.3 -9 677.40 -43.0 -42.9 -43.1 69 -99 SPO 1997 04 08 15 55 353 4.5 -9 677.50 -43.0 -42.9 -43.1 69 -99 SPO 1997 04 08 15 56 354 4.7 -9 677.50 -43.0 -42.8 -43.1 69 -99 SPO 1997 04 08 15 57 351 4.8 -9 677.40 -43.0 -42.8 -43.1 68 -99 SPO 1997 04 08 15 58 349 4.7 -9 677.50 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 15 59 348 4.8 -9 677.50 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 16 00 345 4.6 -9 677.40 -43.1 -42.8 -43.2 68 0 SPO 1997 04 08 16 01 344 4.8 -9 677.40 -43.1 -42.8 -43.2 69 -99 SPO 1997 04 08 16 02 344 4.9 -9 677.40 -43.1 -42.6 -43.2 69 -99 SPO 1997 04 08 16 03 343 4.9 -9 677.40 -43.1 -42.6 -43.2 69 -99 SPO 1997 04 08 16 04 342 5.0 -9 677.40 -43.1 -42.5 -43.2 68 -99 SPO 1997 04 08 16 05 341 5.2 -9 677.40 -43.1 -42.5 -43.1 68 -99 SPO 1997 04 08 16 06 342 5.1 -9 677.40 -43.1 -42.6 -43.1 68 -99 SPO 1997 04 08 16 07 343 5.2 -9 677.40 -43.1 -42.6 -43.2 68 -99 SPO 1997 04 08 16 08 343 5.2 -9 677.40 -43.1 -42.5 -43.2 68 -99 SPO 1997 04 08 16 09 342 5.1 -9 677.40 -43.1 -42.4 -43.2 69 -99 SPO 1997 04 08 16 10 342 5.4 -9 677.40 -43.1 -42.5 -43.1 68 -99 SPO 1997 04 08 16 11 344 5.2 -9 677.40 -43.1 -42.6 -43.1 68 -99 SPO 1997 04 08 16 12 344 5.2 -9 677.40 -43.1 -42.6 -43.1 68 -99 SPO 1997 04 08 16 13 343 5.3 -9 677.40 -43.0 -42.5 -43.2 68 -99 SPO 1997 04 08 16 14 343 5.1 -9 677.40 -43.1 -42.6 -43.2 68 -99 SPO 1997 04 08 16 15 343 5.0 -9 677.40 -43.1 -42.6 -43.2 68 -99 SPO 1997 04 08 16 16 343 5.0 -9 677.40 -43.1 -42.5 -43.2 69 -99 SPO 1997 04 08 16 17 343 5.0 -9 677.40 -43.2 -42.6 -43.2 69 -99 SPO 1997 04 08 16 18 343 5.0 -9 677.40 -43.2 -42.6 -43.2 68 -99 SPO 1997 04 08 16 19 343 5.0 -9 677.40 -43.2 -42.6 -43.3 68 -99 SPO 1997 04 08 16 20 342 5.1 -9 677.40 -43.2 -42.6 -43.3 68 -99 SPO 1997 04 08 16 21 342 5.3 -9 677.40 -43.2 -42.6 -43.3 68 -99 SPO 1997 04 08 16 22 342 5.2 -9 677.40 -43.2 -42.6 -43.3 69 -99 SPO 1997 04 08 16 23 342 5.1 -9 677.40 -43.2 -42.6 -43.3 69 -99 SPO 1997 04 08 16 24 342 5.0 -9 677.40 -43.2 -42.6 -43.3 69 -99 SPO 1997 04 08 16 25 342 5.0 -9 677.40 -43.2 -42.7 -43.3 68 -99 SPO 1997 04 08 16 26 342 4.9 -9 677.40 -43.2 -42.8 -43.3 68 -99 SPO 1997 04 08 16 27 342 4.7 -9 677.40 -43.2 -42.6 -43.3 68 -99 SPO 1997 04 08 16 28 340 4.6 -9 677.40 -43.3 -42.8 -43.3 69 -99 SPO 1997 04 08 16 29 340 4.7 -9 677.40 -43.3 -43.0 -43.3 69 -99 SPO 1997 04 08 16 30 341 4.8 -9 677.40 -43.3 -43.0 -43.4 70 -99 SPO 1997 04 08 16 31 343 4.7 -9 677.40 -43.3 -42.8 -43.4 69 -99 SPO 1997 04 08 16 32 342 4.6 -9 677.40 -43.4 -42.8 -43.4 69 -99 SPO 1997 04 08 16 33 341 4.7 -9 677.40 -43.3 -42.9 -43.4 68 -99 SPO 1997 04 08 16 34 342 4.8 -9 677.40 -43.3 -42.8 -43.4 68 -99 SPO 1997 04 08 16 35 342 4.9 -9 677.40 -43.3 -42.7 -43.4 68 -99 SPO 1997 04 08 16 36 342 4.9 -9 677.40 -43.3 -42.6 -43.4 68 -99 SPO 1997 04 08 16 37 342 4.8 -9 677.40 -43.4 -42.6 -43.4 70 -99 SPO 1997 04 08 16 38 342 5.0 -9 677.40 -43.4 -42.7 -43.4 69 -99 SPO 1997 04 08 16 39 342 4.8 -9 677.40 -43.4 -42.7 -43.4 69 -99 SPO 1997 04 08 16 40 342 4.8 -9 677.40 -43.4 -42.7 -43.4 68 -99 SPO 1997 04 08 16 41 343 4.9 -9 677.40 -43.3 -42.8 -43.4 68 -99 SPO 1997 04 08 16 42 343 4.8 -9 677.40 -43.4 -42.8 -43.4 69 -99 SPO 1997 04 08 16 43 344 4.7 -9 677.40 -43.4 -42.9 -43.4 70 -99 SPO 1997 04 08 16 44 344 4.7 -9 677.40 -43.4 -43.0 -43.4 69 -99 SPO 1997 04 08 16 45 344 4.7 -9 677.40 -43.4 -43.1 -43.5 69 -99 SPO 1997 04 08 16 46 343 4.7 -9 677.40 -43.4 -43.0 -43.5 68 -99 SPO 1997 04 08 16 47 345 4.8 -9 677.40 -43.4 -43.0 -43.6 68 -99 SPO 1997 04 08 16 48 344 4.8 -9 677.40 -43.4 -43.0 -43.5 67 -99 SPO 1997 04 08 16 49 343 4.8 -9 677.40 -43.4 -43.0 -43.5 68 -99 SPO 1997 04 08 16 50 343 4.8 -9 677.40 -43.5 -42.9 -43.5 68 -99 SPO 1997 04 08 16 51 343 4.9 -9 677.40 -43.5 -42.8 -43.5 68 -99 SPO 1997 04 08 16 52 342 5.0 -9 677.40 -43.5 -42.7 -43.5 69 -99 SPO 1997 04 08 16 53 343 5.1 -9 677.30 -43.4 -42.6 -43.5 69 -99 SPO 1997 04 08 16 54 343 5.1 -9 677.30 -43.5 -42.6 -43.5 70 -99 SPO 1997 04 08 16 55 344 5.2 -9 677.30 -43.4 -42.6 -43.4 69 -99 SPO 1997 04 08 16 56 345 5.2 -9 677.30 -43.3 -42.6 -43.4 68 -99 SPO 1997 04 08 16 57 347 5.0 -9 677.30 -43.4 -42.6 -43.4 69 -99 SPO 1997 04 08 16 58 349 5.0 -9 677.30 -43.4 -42.6 -43.5 68 -99 SPO 1997 04 08 16 59 350 4.7 -9 677.30 -43.4 -42.6 -43.5 68 -99 SPO 1997 04 08 17 00 350 4.6 -9 677.30 -43.4 -42.8 -43.5 68 0 SPO 1997 04 08 17 01 352 4.8 -9 677.30 -43.4 -42.9 -43.5 68 -99 SPO 1997 04 08 17 02 353 4.8 -9 677.30 -43.4 -42.9 -43.5 68 -99 SPO 1997 04 08 17 03 352 4.8 -9 677.30 -43.4 -42.9 -43.5 67 -99 SPO 1997 04 08 17 04 352 5.1 -9 677.30 -43.4 -42.8 -43.5 68 -99 SPO 1997 04 08 17 05 351 5.0 -9 677.30 -43.4 -42.8 -43.5 69 -99 SPO 1997 04 08 17 06 350 5.1 -9 677.30 -43.4 -42.8 -43.5 69 -99 SPO 1997 04 08 17 07 348 4.9 -9 677.30 -43.4 -42.7 -43.4 68 -99 SPO 1997 04 08 17 08 347 5.2 -9 677.30 -43.4 -42.6 -43.4 68 -99 SPO 1997 04 08 17 09 347 5.3 -9 677.30 -43.4 -42.5 -43.4 69 -99 SPO 1997 04 08 17 10 346 5.4 -9 677.30 -43.3 -42.5 -43.3 68 -99 SPO 1997 04 08 17 11 345 5.4 -9 677.20 -43.3 -42.3 -43.3 68 -99 SPO 1997 04 08 17 12 345 5.5 -9 677.20 -43.3 -42.3 -43.3 70 -99 SPO 1997 04 08 17 13 345 5.5 -9 677.30 -43.2 -42.2 -43.3 69 -99 SPO 1997 04 08 17 14 346 5.5 -9 677.30 -43.2 -42.2 -43.3 68 -99 SPO 1997 04 08 17 15 346 5.4 -9 677.20 -43.2 -42.3 -43.2 68 -99 SPO 1997 04 08 17 16 347 5.3 -9 677.30 -43.2 -42.4 -43.2 68 -99 SPO 1997 04 08 17 17 348 5.4 -9 677.20 -43.2 -42.4 -43.2 68 -99 SPO 1997 04 08 17 18 348 5.4 -9 677.20 -43.1 -42.5 -43.2 68 -99 SPO 1997 04 08 17 19 349 5.5 -9 677.20 -43.2 -42.6 -43.2 69 -99 SPO 1997 04 08 17 20 349 5.8 -9 677.20 -43.2 -42.6 -43.2 69 -99 SPO 1997 04 08 17 21 349 5.7 -9 677.20 -43.2 -42.5 -43.2 69 -99 SPO 1997 04 08 17 22 349 5.9 -9 677.20 -43.2 -42.5 -43.2 69 -99 SPO 1997 04 08 17 23 349 5.9 -9 677.20 -43.2 -42.5 -43.2 68 -99 SPO 1997 04 08 17 24 348 6.0 -9 677.20 -43.2 -42.5 -43.2 69 -99 SPO 1997 04 08 17 25 348 5.9 -9 677.20 -43.1 -42.4 -43.2 68 -99 SPO 1997 04 08 17 26 347 5.9 -9 677.20 -43.1 -42.4 -43.2 69 -99 SPO 1997 04 08 17 27 347 5.9 -9 677.20 -43.1 -42.4 -43.2 68 -99 SPO 1997 04 08 17 28 347 5.9 -9 677.20 -43.1 -42.4 -43.1 68 -99 SPO 1997 04 08 17 29 348 5.8 -9 677.20 -43.1 -42.5 -43.2 68 -99 SPO 1997 04 08 17 30 347 5.6 -9 677.20 -43.1 -42.6 -43.1 68 -99 SPO 1997 04 08 17 31 348 5.6 -9 677.20 -43.1 -42.6 -43.2 68 -99 SPO 1997 04 08 17 32 348 5.4 -9 677.20 -43.1 -42.7 -43.2 68 -99 SPO 1997 04 08 17 33 348 5.6 -9 677.20 -43.1 -42.6 -43.2 69 -99 SPO 1997 04 08 17 34 349 5.5 -9 677.20 -43.1 -42.6 -43.2 69 -99 SPO 1997 04 08 17 35 349 5.4 -9 677.10 -43.1 -42.6 -43.2 69 -99 SPO 1997 04 08 17 36 350 5.6 -9 677.10 -43.1 -42.6 -43.2 69 -99 SPO 1997 04 08 17 37 350 5.6 -9 677.10 -43.1 -42.7 -43.2 69 -99 SPO 1997 04 08 17 38 352 5.7 -9 677.10 -43.1 -42.7 -43.2 69 -99 SPO 1997 04 08 17 39 353 5.5 -9 677.10 -43.0 -42.7 -43.1 69 -99 SPO 1997 04 08 17 40 354 5.4 -9 677.10 -43.0 -42.8 -43.2 69 -99 SPO 1997 04 08 17 41 355 5.3 -9 677.10 -43.1 -42.8 -43.2 69 -99 SPO 1997 04 08 17 42 356 5.2 -9 677.10 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 43 355 5.2 -9 677.10 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 44 356 5.3 -9 677.10 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 45 354 5.3 -9 677.10 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 46 353 5.3 -9 677.10 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 47 352 5.4 -9 677.10 -43.1 -42.7 -43.2 68 -99 SPO 1997 04 08 17 48 351 5.3 -9 677.10 -43.1 -42.8 -43.2 69 -99 SPO 1997 04 08 17 49 350 5.2 -9 677.10 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 50 351 5.0 -9 677.10 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 17 51 352 5.1 -9 677.10 -43.1 -42.9 -43.2 69 -99 SPO 1997 04 08 17 52 352 5.4 -9 677.00 -43.1 -43.0 -43.2 69 -99 SPO 1997 04 08 17 53 352 5.5 -9 677.00 -43.1 -43.0 -43.2 69 -99 SPO 1997 04 08 17 54 352 5.5 -9 677.00 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 17 55 351 5.6 -9 677.00 -43.2 -43.0 -43.2 69 -99 SPO 1997 04 08 17 56 351 5.6 -9 677.00 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 17 57 351 5.6 -9 677.00 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 58 351 6.0 -9 677.00 -43.1 -42.8 -43.2 68 -99 SPO 1997 04 08 17 59 350 5.9 -9 677.00 -43.1 -42.7 -43.2 68 -99 SPO 1997 04 08 18 00 350 5.8 -9 677.00 -43.1 -42.8 -43.2 68 0 SPO 1997 04 08 18 01 352 5.8 -9 677.00 -43.0 -42.8 -43.2 68 -99 SPO 1997 04 08 18 02 351 5.9 -9 677.00 -43.0 -42.8 -43.1 68 -99 SPO 1997 04 08 18 03 352 5.8 -9 676.90 -43.1 -42.8 -43.1 68 -99 SPO 1997 04 08 18 04 352 5.8 -9 677.00 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 18 05 353 5.7 -9 676.90 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 18 06 352 5.5 -9 676.90 -43.1 -42.9 -43.2 69 -99 SPO 1997 04 08 18 07 352 5.2 -9 676.90 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 18 08 350 5.5 -9 676.90 -43.0 -42.9 -43.1 68 -99 SPO 1997 04 08 18 09 349 5.5 -9 676.90 -43.1 -42.9 -43.2 68 -99 SPO 1997 04 08 18 10 349 5.4 -9 676.90 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 18 11 349 5.8 -9 676.90 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 18 12 349 5.7 -9 676.90 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 18 13 350 6.0 -9 676.90 -43.1 -43.0 -43.2 68 -99 SPO 1997 04 08 18 14 350 5.8 -9 676.90 -43.1 -43.1 -43.2 69 -99 SPO 1997 04 08 18 15 350 6.0 -9 676.90 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 18 16 351 5.9 -9 676.90 -43.2 -43.1 -43.2 69 -99 SPO 1997 04 08 18 17 350 5.9 -9 676.90 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 18 18 350 5.9 -9 676.90 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 18 19 350 5.8 -9 676.90 -43.1 -43.2 -43.2 68 -99 SPO 1997 04 08 18 20 350 5.7 -9 676.80 -43.2 -43.2 -43.2 70 -99 SPO 1997 04 08 18 21 350 5.7 -9 676.80 -43.2 -43.2 -43.2 71 -99 SPO 1997 04 08 18 22 350 5.8 -9 676.80 -43.1 -43.1 -43.2 69 -99 SPO 1997 04 08 18 23 350 5.5 -9 676.80 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 18 24 350 5.3 -9 676.80 -43.1 -43.1 -43.2 68 -99 SPO 1997 04 08 18 25 349 5.4 -9 676.80 -43.2 -43.1 -43.2 69 -99 SPO 1997 04 08 18 26 350 5.4 -9 676.80 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 18 27 350 5.2 -9 676.80 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 18 28 351 5.1 -9 676.80 -43.2 -43.1 -43.2 68 -99 SPO 1997 04 08 18 29 352 5.2 -9 676.80 -43.2 -43.2 -43.3 68 -99 SPO 1997 04 08 18 30 352 5.2 -9 676.80 -43.2 -43.2 -43.3 69 -99 SPO 1997 04 08 18 31 352 5.4 -9 676.80 -43.2 -43.2 -43.3 69 -99 SPO 1997 04 08 18 32 352 5.2 -9 676.80 -43.2 -43.2 -43.3 69 -99 SPO 1997 04 08 18 33 352 5.2 -9 676.80 -43.2 -43.3 -43.3 69 -99 SPO 1997 04 08 18 34 353 5.3 -9 676.80 -43.2 -43.3 -43.3 69 -99 SPO 1997 04 08 18 35 352 5.1 -9 676.80 -43.2 -43.3 -43.3 69 -99 SPO 1997 04 08 18 36 351 4.9 -9 676.80 -43.2 -43.3 -43.3 69 -99 SPO 1997 04 08 18 37 351 4.9 -9 676.70 -43.3 -43.4 -43.3 69 -99 SPO 1997 04 08 18 38 352 5.0 -9 676.80 -43.3 -43.4 -43.4 68 -99 SPO 1997 04 08 18 39 352 5.0 -9 676.70 -43.3 -43.4 -43.4 68 -99 SPO 1997 04 08 18 40 350 5.0 -9 676.80 -43.3 -43.4 -43.4 68 -99 SPO 1997 04 08 18 41 351 5.0 -9 676.80 -43.4 -43.4 -43.4 69 -99 SPO 1997 04 08 18 42 350 5.1 -9 676.80 -43.4 -43.3 -43.4 69 -99 SPO 1997 04 08 18 43 349 4.9 -9 676.80 -43.3 -43.3 -43.4 68 -99 SPO 1997 04 08 18 44 346 4.8 -9 676.80 -43.3 -43.4 -43.5 68 -99 SPO 1997 04 08 18 45 348 4.8 -9 676.80 -43.4 -43.4 -43.5 69 -99 SPO 1997 04 08 18 46 349 4.8 -9 676.80 -43.4 -43.3 -43.5 69 -99 SPO 1997 04 08 18 47 348 4.5 -9 676.80 -43.4 -43.4 -43.5 69 -99 SPO 1997 04 08 18 48 346 4.3 -9 676.80 -43.4 -43.4 -43.5 69 -99 SPO 1997 04 08 18 49 346 4.5 -9 676.80 -43.5 -43.4 -43.6 69 -99 SPO 1997 04 08 18 50 350 4.5 -9 676.80 -43.5 -43.5 -43.6 68 -99 SPO 1997 04 08 18 51 350 4.5 -9 676.80 -43.5 -43.6 -43.6 68 -99 SPO 1997 04 08 18 52 350 4.3 -9 676.80 -43.6 -43.6 -43.6 68 -99 SPO 1997 04 08 18 53 350 4.3 -9 676.90 -43.5 -43.6 -43.6 68 -99 SPO 1997 04 08 18 54 351 4.1 -9 676.80 -43.6 -43.6 -43.7 69 -99 SPO 1997 04 08 18 55 350 4.1 -9 676.90 -43.6 -43.6 -43.7 69 -99 SPO 1997 04 08 18 56 350 4.1 -9 676.90 -43.6 -43.6 -43.6 69 -99 SPO 1997 04 08 18 57 348 3.9 -9 676.90 -43.6 -43.6 -43.6 69 -99 SPO 1997 04 08 18 58 351 3.7 -9 676.90 -43.6 -43.6 -43.7 69 -99 SPO 1997 04 08 18 59 350 3.4 -9 676.90 -43.6 -43.6 -43.7 68 -99 SPO 1997 04 08 19 00 -999 -99.9 -9 676.70 -43.7 -43.2 -43.8 68 0 SPO 1997 04 08 19 01 352 2.8 -9 677.00 -43.7 -43.6 -43.7 69 -99 SPO 1997 04 08 19 02 352 3.0 -9 677.00 -43.6 -43.7 -43.7 69 -99 SPO 1997 04 08 19 03 351 2.6 -9 676.90 -43.6 -43.7 -43.7 69 -99 SPO 1997 04 08 19 04 345 2.8 -9 677.00 -43.7 -43.7 -43.8 69 -99 SPO 1997 04 08 19 05 345 2.5 -9 677.00 -43.7 -43.7 -43.8 68 -99 SPO 1997 04 08 19 06 344 2.6 -9 677.00 -43.7 -43.7 -43.8 68 -99 SPO 1997 04 08 19 07 343 2.6 -9 676.90 -43.7 -43.6 -43.8 68 -99 SPO 1997 04 08 19 08 345 2.7 -9 676.90 -43.7 -43.6 -43.8 68 -99 SPO 1997 04 08 19 09 344 2.9 -9 676.90 -43.7 -43.5 -43.7 68 -99 SPO 1997 04 08 19 10 344 3.0 -9 676.90 -43.7 -43.5 -43.8 68 -99 SPO 1997 04 08 19 11 346 3.1 -9 676.90 -43.7 -43.5 -43.8 68 -99 SPO 1997 04 08 19 12 346 3.1 -9 676.90 -43.7 -43.4 -43.8 68 -99 SPO 1997 04 08 19 13 347 3.4 -9 676.80 -43.7 -43.4 -43.8 69 -99 SPO 1997 04 08 19 14 347 3.3 -9 676.80 -43.7 -43.5 -43.8 69 -99 SPO 1997 04 08 19 15 351 3.5 -9 676.80 -43.7 -43.6 -43.8 69 -99 SPO 1997 04 08 19 16 353 3.4 -9 676.80 -43.7 -43.6 -43.8 69 -99 SPO 1997 04 08 19 17 355 3.2 -9 676.80 -43.7 -43.6 -43.8 68 -99 SPO 1997 04 08 19 18 355 3.2 -9 676.80 -43.7 -43.7 -43.8 68 -99 SPO 1997 04 08 19 19 357 3.4 -9 676.80 -43.7 -43.6 -43.8 68 -99 SPO 1997 04 08 19 20 357 3.3 -9 676.80 -43.8 -43.6 -43.8 68 -99 SPO 1997 04 08 19 21 356 3.5 -9 676.80 -43.8 -43.4 -43.9 68 -99 SPO 1997 04 08 19 22 354 3.5 -9 676.80 -43.8 -43.3 -43.8 68 -99 SPO 1997 04 08 19 23 353 3.5 -9 676.80 -43.8 -43.3 -43.8 68 -99 SPO 1997 04 08 19 24 350 3.4 -9 676.80 -43.7 -43.3 -43.8 68 -99 SPO 1997 04 08 19 25 350 3.4 -9 676.80 -43.7 -43.2 -43.8 68 -99 SPO 1997 04 08 19 26 348 3.4 -9 676.80 -43.7 -43.2 -43.8 68 -99 SPO 1997 04 08 19 27 349 3.5 -9 676.70 -43.7 -43.1 -43.8 68 -99 SPO 1997 04 08 19 28 349 3.6 -9 676.70 -43.7 -43.1 -43.8 68 -99 SPO 1997 04 08 19 29 349 3.3 -9 676.70 -43.7 -43.1 -43.7 68 -99 SPO 1997 04 08 19 30 -999 -99.9 -9 676.70 -43.7 -43.2 -43.7 69 -99 SPO 1997 04 08 19 31 355 3.2 -9 676.70 -43.7 -43.2 -43.8 68 -99 SPO 1997 04 08 19 32 354 3.1 -9 676.70 -43.7 -43.2 -43.8 68 -99 SPO 1997 04 08 19 33 354 3.0 -9 676.70 -43.7 -43.3 -43.8 68 -99 SPO 1997 04 08 19 34 351 3.2 -9 676.60 -43.7 -43.3 -43.8 68 -99 SPO 1997 04 08 19 35 350 3.2 -9 676.60 -43.7 -43.4 -43.8 68 -99 SPO 1997 04 08 19 36 351 3.2 -9 676.60 -43.8 -43.3 -43.8 68 -99 SPO 1997 04 08 19 37 350 3.4 -9 676.60 -43.8 -43.2 -43.9 69 -99 SPO 1997 04 08 19 38 348 3.4 -9 676.60 -43.8 -43.2 -43.8 68 -99 SPO 1997 04 08 19 39 347 3.4 -9 676.60 -43.8 -43.2 -43.8 69 -99 SPO 1997 04 08 19 40 346 3.5 -9 676.60 -43.8 -43.1 -43.9 69 -99 SPO 1997 04 08 19 41 346 3.6 -9 676.50 -43.8 -43.0 -43.8 69 -99 SPO 1997 04 08 19 42 346 3.9 -9 676.60 -43.8 -42.9 -43.8 69 -99 SPO 1997 04 08 19 43 346 4.0 -9 676.60 -43.8 -42.8 -43.8 70 -99 SPO 1997 04 08 19 44 346 4.0 -9 676.50 -43.7 -42.8 -43.8 68 -99 SPO 1997 04 08 19 45 344 4.1 -9 676.50 -43.7 -42.6 -43.8 68 -99 SPO 1997 04 08 19 46 343 4.4 -9 676.50 -43.7 -42.6 -43.8 68 -99 SPO 1997 04 08 19 47 343 4.5 -9 676.50 -43.7 -42.5 -43.8 68 -99 SPO 1997 04 08 19 48 342 4.7 -9 676.50 -43.7 -42.4 -43.8 68 -99 SPO 1997 04 08 19 49 342 4.8 -9 676.50 -43.7 -42.4 -43.7 68 -99 SPO 1997 04 08 19 50 342 4.9 -9 676.50 -43.7 -42.3 -43.7 68 -99 SPO 1997 04 08 19 51 342 5.0 -9 676.50 -43.7 -42.3 -43.7 68 -99 SPO 1997 04 08 19 52 343 5.0 -9 676.50 -43.7 -42.3 -43.7 68 -99 SPO 1997 04 08 19 53 343 5.0 -9 676.50 -43.6 -42.3 -43.7 68 -99 SPO 1997 04 08 19 54 344 5.0 -9 676.50 -43.6 -42.3 -43.7 68 -99 SPO 1997 04 08 19 55 345 5.0 -9 676.40 -43.6 -42.4 -43.7 68 -99 SPO 1997 04 08 19 56 344 5.1 -9 676.40 -43.7 -42.5 -43.8 69 -99 SPO 1997 04 08 19 57 345 5.3 -9 676.40 -43.7 -42.4 -43.8 69 -99 SPO 1997 04 08 19 58 344 5.5 -9 676.40 -43.7 -42.3 -43.8 69 -99 SPO 1997 04 08 19 59 344 5.6 -9 676.40 -43.7 -42.2 -43.7 69 -99 SPO 1997 04 08 20 00 342 5.6 -9 676.40 -43.7 -42.2 -43.7 69 0 SPO 1997 04 08 20 01 340 5.5 -9 676.40 -43.6 -42.2 -43.7 68 -99 SPO 1997 04 08 20 02 339 5.4 -9 676.40 -43.6 -42.2 -43.7 68 -99 SPO 1997 04 08 20 03 340 5.4 -9 676.40 -43.6 -42.2 -43.6 68 -99 SPO 1997 04 08 20 04 342 5.2 -9 676.40 -43.6 -42.2 -43.6 68 -99 SPO 1997 04 08 20 05 344 4.9 -9 676.40 -43.6 -42.3 -43.6 69 -99 SPO 1997 04 08 20 06 345 4.8 -9 676.40 -43.6 -42.4 -43.7 69 -99 SPO 1997 04 08 20 07 346 4.9 -9 676.40 -43.6 -42.4 -43.8 69 -99 SPO 1997 04 08 20 08 346 4.8 -9 676.40 -43.7 -42.4 -43.8 69 -99 SPO 1997 04 08 20 09 347 4.8 -9 676.40 -43.7 -42.5 -43.8 68 -99 SPO 1997 04 08 20 10 348 4.8 -9 676.30 -43.7 -42.5 -43.8 69 -99 SPO 1997 04 08 20 11 349 4.9 -9 676.30 -43.7 -42.4 -43.8 69 -99 SPO 1997 04 08 20 12 349 5.0 -9 676.30 -43.7 -42.5 -43.8 69 -99 SPO 1997 04 08 20 13 350 4.9 -9 676.30 -43.8 -42.5 -43.9 69 -99 SPO 1997 04 08 20 14 349 5.1 -9 676.30 -43.8 -42.5 -43.8 68 -99 SPO 1997 04 08 20 15 347 4.9 -9 676.30 -43.7 -42.5 -43.8 67 -99 SPO 1997 04 08 20 16 345 5.2 -9 676.30 -43.8 -42.6 -43.8 68 -99 SPO 1997 04 08 20 17 344 5.3 -9 676.30 -43.8 -42.5 -43.8 68 -99 SPO 1997 04 08 20 18 343 5.4 -9 676.20 -43.8 -42.4 -43.8 68 -99 SPO 1997 04 08 20 19 342 5.6 -9 676.20 -43.7 -42.2 -43.8 68 -99 SPO 1997 04 08 20 20 342 5.5 -9 676.20 -43.7 -42.3 -43.7 68 -99 SPO 1997 04 08 20 21 343 5.6 -9 676.20 -43.7 -42.3 -43.7 69 -99 SPO 1997 04 08 20 22 345 5.5 -9 676.20 -43.7 -42.3 -43.8 69 -99 SPO 1997 04 08 20 23 347 5.3 -9 676.20 -43.7 -42.4 -43.8 69 -99 SPO 1997 04 08 20 24 347 5.3 -9 676.20 -43.8 -42.4 -43.8 70 -99 SPO 1997 04 08 20 25 346 5.1 -9 676.20 -43.8 -42.5 -43.8 69 -99 SPO 1997 04 08 20 26 351 5.6 -9 676.20 -43.7 -42.5 -43.8 68 -99 SPO 1997 04 08 20 27 352 5.5 -9 676.20 -43.7 -42.4 -43.8 68 -99 SPO 1997 04 08 20 28 351 5.6 -9 676.20 -43.7 -42.4 -43.8 68 -99 SPO 1997 04 08 20 29 351 5.5 -9 676.20 -43.7 -42.5 -43.8 68 -99 SPO 1997 04 08 20 30 352 5.5 -9 676.20 -43.7 -42.4 -43.8 68 -99 SPO 1997 04 08 20 31 355 5.3 -9 676.20 -43.7 -42.5 -43.8 68 -99 SPO 1997 04 08 20 32 357 5.2 -9 676.20 -43.8 -42.5 -43.8 68 -99 SPO 1997 04 08 20 33 358 5.1 -9 676.20 -43.8 -42.6 -43.8 68 -99 SPO 1997 04 08 20 34 356 5.1 -9 676.20 -43.8 -42.6 -43.9 69 -99 SPO 1997 04 08 20 35 356 4.9 -9 676.20 -43.8 -42.7 -43.9 68 -99 SPO 1997 04 08 20 36 358 5.0 -9 676.20 -43.8 -42.8 -43.9 68 -99 SPO 1997 04 08 20 37 357 4.8 -9 676.20 -43.8 -42.8 -43.9 68 -99 SPO 1997 04 08 20 38 357 5.0 -9 676.20 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 39 357 4.9 -9 676.20 -43.8 -43.0 -43.9 68 -99 SPO 1997 04 08 20 40 357 5.3 -9 676.20 -43.9 -43.0 -43.9 69 -99 SPO 1997 04 08 20 41 354 5.3 -9 676.20 -43.9 -43.0 -43.9 69 -99 SPO 1997 04 08 20 42 353 5.4 -9 676.20 -43.9 -42.9 -43.9 68 -99 SPO 1997 04 08 20 43 352 5.4 -9 676.20 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 44 353 5.6 -9 676.20 -43.9 -42.9 -43.9 68 -99 SPO 1997 04 08 20 45 352 5.6 -9 676.20 -43.9 -42.9 -43.9 68 -99 SPO 1997 04 08 20 46 351 5.7 -9 676.20 -43.9 -42.9 -43.9 68 -99 SPO 1997 04 08 20 47 350 5.6 -9 676.20 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 48 351 5.8 -9 676.20 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 49 352 5.7 -9 676.20 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 50 352 5.8 -9 676.10 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 51 353 5.8 -9 676.10 -43.8 -42.8 -43.9 68 -99 SPO 1997 04 08 20 52 355 5.7 -9 676.10 -43.8 -42.9 -43.9 68 -99 SPO 1997 04 08 20 53 356 5.7 -9 676.10 -43.8 -43.0 -43.9 69 -99 SPO 1997 04 08 20 54 356 5.7 -9 676.10 -43.8 -43.1 -43.9 69 -99 SPO 1997 04 08 20 55 356 5.6 -9 676.10 -43.9 -43.2 -43.9 70 -99 SPO 1997 04 08 20 56 356 5.7 -9 676.10 -43.9 -43.3 -44.0 68 -99 SPO 1997 04 08 20 57 356 5.7 -9 676.10 -43.9 -43.3 -44.0 68 -99 SPO 1997 04 08 20 58 356 5.8 -9 676.10 -43.9 -43.3 -44.0 68 -99 SPO 1997 04 08 20 59 355 5.6 -9 676.10 -43.9 -43.3 -44.0 68 -99 SPO 1997 04 08 21 00 355 5.7 -9 676.10 -43.9 -43.2 -44.0 68 0 SPO 1997 04 08 21 01 353 5.7 -9 676.10 -43.9 -43.3 -44.0 68 -99 SPO 1997 04 08 21 02 353 5.6 -9 676.10 -43.9 -43.3 -44.0 69 -99 SPO 1997 04 08 21 03 352 5.6 -9 676.10 -43.9 -43.4 -44.0 68 -99 SPO 1997 04 08 21 04 352 5.5 -9 676.10 -43.9 -43.4 -44.0 68 -99 SPO 1997 04 08 21 05 351 5.7 -9 676.10 -43.9 -43.2 -44.0 68 -99 SPO 1997 04 08 21 06 349 5.7 -9 676.10 -44.0 -43.2 -44.0 69 -99 SPO 1997 04 08 21 07 349 5.7 -9 676.10 -44.0 -43.1 -43.9 69 -99 SPO 1997 04 08 21 08 352 5.7 -9 676.10 -43.8 -43.1 -43.9 68 -99 SPO 1997 04 08 21 09 352 5.4 -9 676.10 -43.8 -43.2 -44.0 68 -99 SPO 1997 04 08 21 10 352 5.6 -9 676.10 -43.9 -43.3 -44.0 68 -99 SPO 1997 04 08 21 11 353 5.4 -9 676.00 -43.9 -43.4 -44.0 68 -99 SPO 1997 04 08 21 12 353 5.5 -9 676.00 -44.0 -43.4 -44.1 68 -99 SPO 1997 04 08 21 13 354 5.5 -9 676.00 -44.0 -43.5 -44.1 68 -99 SPO 1997 04 08 21 14 352 5.5 -9 676.00 -44.0 -43.5 -44.1 68 -99 SPO 1997 04 08 21 15 352 5.6 -9 676.00 -44.0 -43.5 -44.1 69 -99 SPO 1997 04 08 21 16 353 5.6 -9 676.00 -44.0 -43.6 -44.1 69 -99 SPO 1997 04 08 21 17 354 5.6 -9 676.00 -44.0 -43.6 -44.1 68 -99 SPO 1997 04 08 21 18 355 5.5 -9 676.00 -44.0 -43.8 -44.1 68 -99 SPO 1997 04 08 21 19 355 5.6 -9 676.00 -44.0 -43.9 -44.1 68 -99 SPO 1997 04 08 21 20 355 5.6 -9 676.00 -44.0 -43.9 -44.2 68 -99 SPO 1997 04 08 21 21 356 5.7 -9 676.00 -44.1 -43.9 -44.2 69 -99 SPO 1997 04 08 21 22 356 6.0 -9 676.00 -44.1 -43.9 -44.2 69 -99 SPO 1997 04 08 21 23 357 5.9 -9 676.00 -44.1 -43.9 -44.1 68 -99 SPO 1997 04 08 21 24 355 6.0 -9 676.00 -44.1 -43.9 -44.2 67 -99 SPO 1997 04 08 21 25 354 6.0 -9 676.00 -44.1 -43.9 -44.1 67 -99 SPO 1997 04 08 21 26 353 6.0 -9 676.00 -44.1 -43.9 -44.2 67 -99 SPO 1997 04 08 21 27 352 5.8 -9 676.00 -44.1 -43.9 -44.1 68 -99 SPO 1997 04 08 21 28 352 5.9 -9 676.00 -44.0 -43.9 -44.1 68 -99 SPO 1997 04 08 21 29 352 5.6 -9 676.00 -44.0 -43.9 -44.1 68 -99 SPO 1997 04 08 21 30 354 5.9 -9 675.90 -44.0 -44.0 -44.1 68 -99 SPO 1997 04 08 21 31 356 5.9 -9 675.90 -44.1 -44.0 -44.2 69 -99 SPO 1997 04 08 21 32 356 6.0 -9 675.90 -44.1 -44.0 -44.2 68 -99 SPO 1997 04 08 21 33 356 6.0 -9 675.90 -44.1 -44.0 -44.2 68 -99 SPO 1997 04 08 21 34 354 6.1 -9 675.90 -44.1 -44.0 -44.2 68 -99 SPO 1997 04 08 21 35 353 6.0 -9 675.90 -44.1 -43.9 -44.2 69 -99 SPO 1997 04 08 21 36 353 6.1 -9 675.90 -44.1 -43.9 -44.2 69 -99 SPO 1997 04 08 21 37 353 6.0 -9 675.90 -44.1 -43.9 -44.2 68 -99 SPO 1997 04 08 21 38 353 6.0 -9 675.90 -44.1 -43.9 -44.2 66 -99 SPO 1997 04 08 21 39 353 6.1 -9 675.90 -44.1 -44.0 -44.2 66 -99 SPO 1997 04 08 21 40 354 6.0 -9 675.90 -44.1 -44.0 -44.2 67 -99 SPO 1997 04 08 21 41 355 6.1 -9 675.90 -44.0 -44.0 -44.2 68 -99 SPO 1997 04 08 21 42 354 6.1 -9 675.90 -44.1 -44.1 -44.2 68 -99 SPO 1997 04 08 21 43 354 6.1 -9 675.90 -44.1 -44.1 -44.2 69 -99 SPO 1997 04 08 21 44 354 6.2 -9 675.90 -44.2 -44.1 -44.2 69 -99 SPO 1997 04 08 21 45 353 6.1 -9 675.80 -44.2 -44.1 -44.2 69 -99 SPO 1997 04 08 21 46 352 6.4 -9 675.80 -44.2 -44.1 -44.2 69 -99 SPO 1997 04 08 21 47 353 6.3 -9 675.80 -44.2 -44.1 -44.2 69 -99 SPO 1997 04 08 21 48 353 6.3 -9 675.80 -44.1 -44.0 -44.2 68 -99 SPO 1997 04 08 21 49 352 6.3 -9 675.80 -44.1 -44.0 -44.2 69 -99 SPO 1997 04 08 21 50 352 6.4 -9 675.80 -44.2 -44.0 -44.2 69 -99 SPO 1997 04 08 21 51 353 6.3 -9 675.80 -44.2 -44.0 -44.3 68 -99 SPO 1997 04 08 21 52 353 6.2 -9 675.80 -44.2 -44.0 -44.2 67 -99 SPO 1997 04 08 21 53 352 6.3 -9 675.80 -44.2 -44.0 -44.2 67 -99 SPO 1997 04 08 21 54 352 6.1 -9 675.80 -44.2 -44.0 -44.2 68 -99 SPO 1997 04 08 21 55 352 6.1 -9 675.80 -44.2 -44.0 -44.2 69 -99 SPO 1997 04 08 21 56 351 6.1 -9 675.80 -44.2 -43.9 -44.2 69 -99 SPO 1997 04 08 21 57 350 6.0 -9 675.80 -44.2 -43.9 -44.2 68 -99 SPO 1997 04 08 21 58 349 5.8 -9 675.80 -44.2 -43.9 -44.3 68 -99 SPO 1997 04 08 21 59 349 5.9 -9 675.80 -44.2 -43.9 -44.2 68 -99 SPO 1997 04 08 22 00 350 6.0 -9 675.80 -44.2 -44.0 -44.3 68 0 SPO 1997 04 08 22 01 352 5.8 -9 675.80 -44.2 -44.0 -44.2 69 -99 SPO 1997 04 08 22 02 352 5.9 -9 675.80 -44.2 -44.0 -44.3 69 -99 SPO 1997 04 08 22 03 354 6.0 -9 675.80 -44.2 -44.1 -44.3 68 -99 SPO 1997 04 08 22 04 354 6.0 -9 675.80 -44.2 -44.1 -44.3 67 -99 SPO 1997 04 08 22 05 354 5.9 -9 675.80 -44.2 -44.1 -44.3 67 -99 SPO 1997 04 08 22 06 353 6.0 -9 675.80 -44.3 -44.0 -44.4 67 -99 SPO 1997 04 08 22 07 352 6.0 -9 675.80 -44.3 -44.0 -44.3 67 -99 SPO 1997 04 08 22 08 351 6.0 -9 675.80 -44.2 -44.0 -44.3 68 -99 SPO 1997 04 08 22 09 351 6.2 -9 675.80 -44.2 -44.0 -44.3 68 -99 SPO 1997 04 08 22 10 351 6.2 -9 675.80 -44.3 -44.0 -44.4 69 -99 SPO 1997 04 08 22 11 351 6.2 -9 675.80 -44.3 -44.0 -44.4 69 -99 SPO 1997 04 08 22 12 352 6.0 -9 675.80 -44.3 -44.0 -44.3 69 -99 SPO 1997 04 08 22 13 352 6.0 -9 675.80 -44.3 -44.0 -44.3 69 -99 SPO 1997 04 08 22 14 353 6.0 -9 675.80 -44.3 -44.0 -44.4 69 -99 SPO 1997 04 08 22 15 353 6.0 -9 675.80 -44.3 -43.9 -44.4 69 -99 SPO 1997 04 08 22 16 353 6.0 -9 675.80 -44.3 -43.9 -44.4 67 -99 SPO 1997 04 08 22 17 353 6.0 -9 675.80 -44.3 -43.9 -44.4 67 -99 SPO 1997 04 08 22 18 352 5.8 -9 675.80 -44.3 -44.0 -44.4 67 -99 SPO 1997 04 08 22 19 353 5.8 -9 675.80 -44.3 -44.0 -44.4 66 -99 SPO 1997 04 08 22 20 353 5.9 -9 675.80 -44.3 -44.0 -44.4 66 -99 SPO 1997 04 08 22 21 353 6.0 -9 675.80 -44.3 -44.1 -44.4 67 -99 SPO 1997 04 08 22 22 352 6.0 -9 675.80 -44.3 -44.1 -44.4 67 -99 SPO 1997 04 08 22 23 351 5.9 -9 675.80 -44.4 -44.1 -44.4 68 -99 SPO 1997 04 08 22 24 350 5.8 -9 675.80 -44.4 -44.2 -44.4 68 -99 SPO 1997 04 08 22 25 349 5.9 -9 675.80 -44.4 -44.2 -44.5 68 -99 SPO 1997 04 08 22 26 349 6.0 -9 675.80 -44.4 -44.2 -44.5 67 -99 SPO 1997 04 08 22 27 349 6.0 -9 675.80 -44.4 -44.1 -44.5 67 -99 SPO 1997 04 08 22 28 349 6.0 -9 675.80 -44.4 -44.2 -44.5 67 -99 SPO 1997 04 08 22 29 350 5.9 -9 675.70 -44.4 -44.2 -44.5 68 -99 SPO 1997 04 08 22 30 351 5.9 -9 675.70 -44.4 -44.1 -44.5 67 -99 SPO 1997 04 08 22 31 353 6.0 -9 675.70 -44.4 -44.1 -44.5 67 -99 SPO 1997 04 08 22 32 354 5.8 -9 675.70 -44.4 -44.1 -44.5 67 -99 SPO 1997 04 08 22 33 354 5.7 -9 675.70 -44.5 -44.2 -44.5 67 -99 SPO 1997 04 08 22 34 356 5.5 -9 675.70 -44.5 -44.2 -44.5 67 -99 SPO 1997 04 08 22 35 358 5.5 -9 675.70 -44.5 -44.2 -44.6 68 -99 SPO 1997 04 08 22 36 359 5.4 -9 675.70 -44.5 -44.2 -44.6 67 -99 SPO 1997 04 08 22 37 360 5.4 -9 675.70 -44.5 -44.2 -44.6 67 -99 SPO 1997 04 08 22 38 357 5.2 -9 675.70 -44.5 -44.2 -44.6 67 -99 SPO 1997 04 08 22 39 357 5.3 -9 675.70 -44.5 -44.2 -44.6 67 -99 SPO 1997 04 08 22 40 356 5.5 -9 675.70 -44.5 -44.2 -44.6 67 -99 SPO 1997 04 08 22 41 356 5.4 -9 675.70 -44.5 -44.2 -44.6 67 -99 SPO 1997 04 08 22 42 356 5.5 -9 675.70 -44.5 -44.3 -44.6 67 -99 SPO 1997 04 08 22 43 357 5.6 -9 675.70 -44.5 -44.4 -44.6 67 -99 SPO 1997 04 08 22 44 359 5.6 -9 675.70 -44.5 -44.4 -44.6 67 -99 SPO 1997 04 08 22 45 358 5.6 -9 675.70 -44.6 -44.4 -44.7 67 -99 SPO 1997 04 08 22 46 357 5.6 -9 675.70 -44.6 -44.4 -44.7 67 -99 SPO 1997 04 08 22 47 357 5.6 -9 675.70 -44.5 -44.3 -44.7 67 -99 SPO 1997 04 08 22 48 356 5.6 -9 675.70 -44.6 -44.3 -44.7 67 -99 SPO 1997 04 08 22 49 357 5.7 -9 675.70 -44.6 -44.3 -44.7 67 -99 SPO 1997 04 08 22 50 357 5.8 -9 675.60 -44.6 -44.3 -44.7 67 -99 SPO 1997 04 08 22 51 357 5.8 -9 675.60 -44.6 -44.3 -44.7 67 -99 SPO 1997 04 08 22 52 355 5.7 -9 675.60 -44.6 -44.2 -44.7 67 -99 SPO 1997 04 08 22 53 353 5.6 -9 675.60 -44.7 -44.2 -44.7 69 -99 SPO 1997 04 08 22 54 352 5.8 -9 675.60 -44.7 -44.2 -44.7 69 -99 SPO 1997 04 08 22 55 351 5.8 -9 675.60 -44.7 -44.1 -44.7 69 -99 SPO 1997 04 08 22 56 352 5.8 -9 675.60 -44.7 -44.1 -44.7 68 -99 SPO 1997 04 08 22 57 352 6.0 -9 675.60 -44.7 -44.0 -44.7 67 -99 SPO 1997 04 08 22 58 353 5.9 -9 675.60 -44.6 -44.0 -44.7 66 -99 SPO 1997 04 08 22 59 354 5.8 -9 675.60 -44.6 -44.1 -44.7 66 -99 SPO 1997 04 08 23 00 356 5.7 -9 675.60 -44.6 -44.1 -44.7 66 0 SPO 1997 04 08 23 01 357 5.8 -9 675.60 -44.6 -44.2 -44.7 67 -99 SPO 1997 04 08 23 02 358 5.8 -9 675.60 -44.7 -44.2 -44.7 68 -99 SPO 1997 04 08 23 03 357 6.0 -9 675.60 -44.6 -44.2 -44.7 67 -99 SPO 1997 04 08 23 04 355 5.9 -9 675.60 -44.6 -44.2 -44.7 67 -99 SPO 1997 04 08 23 05 354 6.2 -9 675.60 -44.6 -44.1 -44.7 67 -99 SPO 1997 04 08 23 06 352 6.0 -9 675.60 -44.6 -44.1 -44.7 67 -99 SPO 1997 04 08 23 07 351 6.0 -9 675.60 -44.6 -44.1 -44.7 67 -99 SPO 1997 04 08 23 08 352 6.2 -9 675.60 -44.6 -44.0 -44.7 67 -99 SPO 1997 04 08 23 09 352 6.1 -9 675.60 -44.6 -44.0 -44.7 67 -99 SPO 1997 04 08 23 10 353 6.0 -9 675.60 -44.6 -44.0 -44.7 67 -99 SPO 1997 04 08 23 11 355 5.8 -9 675.60 -44.6 -44.0 -44.7 67 -99 SPO 1997 04 08 23 12 357 5.9 -9 675.60 -44.6 -44.1 -44.7 67 -99 SPO 1997 04 08 23 13 359 5.9 -9 675.60 -44.7 -44.1 -44.7 67 -99 SPO 1997 04 08 23 14 360 6.1 -9 675.60 -44.7 -44.0 -44.8 68 -99 SPO 1997 04 08 23 15 359 6.3 -9 675.50 -44.7 -44.0 -44.8 68 -99 SPO 1997 04 08 23 16 358 6.1 -9 675.50 -44.7 -44.0 -44.7 68 -99 SPO 1997 04 08 23 17 358 6.2 -9 675.50 -44.7 -43.9 -44.7 68 -99 SPO 1997 04 08 23 18 357 6.2 -9 675.50 -44.7 -43.9 -44.7 68 -99 SPO 1997 04 08 23 19 358 6.1 -9 675.50 -44.7 -43.9 -44.7 68 -99 SPO 1997 04 08 23 20 357 6.2 -9 675.50 -44.7 -43.9 -44.7 67 -99 SPO 1997 04 08 23 21 358 6.3 -9 675.50 -44.6 -43.9 -44.7 67 -99 SPO 1997 04 08 23 22 358 6.4 -9 675.50 -44.6 -43.8 -44.7 67 -99 SPO 1997 04 08 23 23 357 6.4 -9 675.50 -44.6 -43.9 -44.7 67 -99 SPO 1997 04 08 23 24 357 6.4 -9 675.50 -44.6 -43.9 -44.7 67 -99 SPO 1997 04 08 23 25 358 6.3 -9 675.50 -44.6 -43.9 -44.7 67 -99 SPO 1997 04 08 23 26 358 6.2 -9 675.50 -44.7 -43.9 -44.8 67 -99 SPO 1997 04 08 23 27 359 6.2 -9 675.50 -44.7 -43.9 -44.8 68 -99 SPO 1997 04 08 23 28 359 6.1 -9 675.50 -44.6 -43.9 -44.8 67 -99 SPO 1997 04 08 23 29 359 6.0 -9 675.50 -44.6 -43.9 -44.8 67 -99 SPO 1997 04 08 23 30 359 6.1 -9 675.50 -44.7 -43.8 -44.8 68 -99 SPO 1997 04 08 23 31 359 6.2 -9 675.50 -44.7 -43.8 -44.8 68 -99 SPO 1997 04 08 23 32 358 6.2 -9 675.50 -44.7 -43.8 -44.7 68 -99 SPO 1997 04 08 23 33 358 6.4 -9 675.50 -44.7 -43.7 -44.8 68 -99 SPO 1997 04 08 23 34 359 6.4 -9 675.50 -44.7 -43.7 -44.8 67 -99 SPO 1997 04 08 23 35 360 6.4 -9 675.50 -44.7 -43.7 -44.7 67 -99 SPO 1997 04 08 23 36 359 6.3 -9 675.50 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 37 357 6.1 -9 675.50 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 38 0 6.2 -9 675.50 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 39 2 6.3 -9 675.50 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 40 2 6.4 -9 675.50 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 41 1 6.5 -9 675.50 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 42 1 6.5 -9 675.50 -44.7 -43.8 -44.7 67 -99 SPO 1997 04 08 23 43 359 6.4 -9 675.50 -44.7 -43.9 -44.7 67 -99 SPO 1997 04 08 23 44 359 6.3 -9 675.50 -44.7 -44.0 -44.8 68 -99 SPO 1997 04 08 23 45 359 6.3 -9 675.50 -44.7 -44.0 -44.8 68 -99 SPO 1997 04 08 23 46 357 6.2 -9 675.50 -44.7 -44.0 -44.8 67 -99 SPO 1997 04 08 23 47 358 6.2 -9 675.50 -44.7 -44.0 -44.8 67 -99 SPO 1997 04 08 23 48 358 6.3 -9 675.50 -44.7 -43.9 -44.8 67 -99 SPO 1997 04 08 23 49 359 6.4 -9 675.50 -44.7 -43.9 -44.8 67 -99 SPO 1997 04 08 23 50 359 6.4 -9 675.40 -44.7 -44.0 -44.8 67 -99 SPO 1997 04 08 23 51 360 6.5 -9 675.40 -44.7 -44.0 -44.8 67 -99 SPO 1997 04 08 23 52 359 6.3 -9 675.40 -44.7 -44.0 -44.8 67 -99 SPO 1997 04 08 23 53 359 6.6 -9 675.40 -44.7 -44.0 -44.8 67 -99 SPO 1997 04 08 23 54 358 6.7 -9 675.40 -44.7 -43.9 -44.8 68 -99 SPO 1997 04 08 23 55 357 6.8 -9 675.40 -44.7 -43.9 -44.8 68 -99 SPO 1997 04 08 23 56 355 6.5 -9 675.40 -44.7 -43.8 -44.8 67 -99 SPO 1997 04 08 23 57 356 6.5 -9 675.40 -44.7 -43.9 -44.8 67 -99 SPO 1997 04 08 23 58 357 6.4 -9 675.30 -44.7 -44.0 -44.8 -99 -99 SPO 1997 04 08 23 59 360 6.7 -9 675.30 -44.7 -44.0 -44.8 -99 -99 SPO 1997 04 09 00 00 -999 -99.9 -9 675.30 -44.7 -43.8 -44.8 -99 0 SPO 1997 04 09 00 01 360 6.9 -9 675.30 -44.7 -43.9 -44.8 -99 -99 SPO 1997 04 09 00 02 358 6.8 -9 675.30 -44.7 -44.0 -44.8 -99 -99 SPO 1997 04 09 00 03 357 6.9 -9 675.30 -44.7 -44.0 -44.8 -99 -99 SPO 1997 04 09 00 04 355 6.9 -9 675.30 -44.7 -44.1 -44.8 -99 -99 SPO 1997 04 09 00 05 354 6.8 -9 675.30 -44.7 -44.1 -44.8 -99 -99 SPO 1997 04 09 00 06 353 6.8 -9 675.30 -44.7 -44.1 -44.8 -99 -99 SPO 1997 04 09 00 07 354 6.6 -9 675.30 -44.7 -44.1 -44.8 -99 -99 SPO 1997 04 09 00 08 356 6.5 -9 675.30 -44.7 -44.2 -44.8 -99 -99 SPO 1997 04 09 00 09 357 6.3 -9 675.30 -44.6 -44.2 -44.8 -99 -99 SPO 1997 04 09 00 10 357 6.2 -9 675.30 -44.7 -44.3 -44.8 -99 -99 SPO 1997 04 09 00 11 356 6.2 -9 675.30 -44.7 -44.3 -44.8 -99 -99 SPO 1997 04 09 00 12 357 6.2 -9 675.30 -44.7 -44.4 -44.8 -99 -99 SPO 1997 04 09 00 13 356 6.1 -9 675.30 -44.7 -44.4 -44.8 68 -99 SPO 1997 04 09 00 14 355 6.2 -9 675.30 -44.8 -44.4 -44.8 69 -99 SPO 1997 04 09 00 15 354 6.0 -9 675.30 -44.8 -44.3 -44.8 68 -99 SPO 1997 04 09 00 16 354 6.0 -9 675.30 -44.8 -44.3 -44.8 67 -99 SPO 1997 04 09 00 17 354 6.1 -9 675.30 -44.8 -44.3 -44.8 67 -99 SPO 1997 04 09 00 18 355 6.2 -9 675.30 -44.8 -44.3 -44.8 67 -99 SPO 1997 04 09 00 19 355 6.0 -9 675.30 -44.7 -44.3 -44.8 67 -99 SPO 1997 04 09 00 20 356 6.0 -9 675.30 -44.8 -44.3 -44.9 68 -99 SPO 1997 04 09 00 21 357 6.0 -9 675.20 -44.8 -44.3 -44.8 68 -99 SPO 1997 04 09 00 22 358 6.0 -9 675.20 -44.8 -44.3 -44.8 68 -99 SPO 1997 04 09 00 23 358 5.8 -9 675.20 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 00 24 358 6.0 -9 675.20 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 00 25 357 6.0 -9 675.20 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 00 26 356 6.0 -9 675.20 -44.8 -44.4 -44.9 68 -99 SPO 1997 04 09 00 27 355 6.0 -9 675.20 -44.8 -44.4 -44.9 68 -99 SPO 1997 04 09 00 28 354 6.0 -9 675.20 -44.8 -44.5 -44.9 67 -99 SPO 1997 04 09 00 29 354 6.3 -9 675.20 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 00 30 354 5.9 -9 675.20 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 00 31 355 5.8 -9 675.20 -44.8 -44.5 -44.9 67 -99 SPO 1997 04 09 00 32 354 5.9 -9 675.20 -44.8 -44.5 -44.9 67 -99 SPO 1997 04 09 00 33 355 5.7 -9 675.20 -44.9 -44.5 -44.9 68 -99 SPO 1997 04 09 00 34 356 5.7 -9 675.20 -44.9 -44.6 -45.0 68 -99 SPO 1997 04 09 00 35 357 5.4 -9 675.20 -44.9 -44.6 -45.0 68 -99 SPO 1997 04 09 00 36 357 5.3 -9 675.20 -44.9 -44.6 -45.0 68 -99 SPO 1997 04 09 00 37 357 5.4 -9 675.20 -44.9 -44.7 -45.0 68 -99 SPO 1997 04 09 00 38 357 5.4 -9 675.20 -44.9 -44.7 -45.0 68 -99 SPO 1997 04 09 00 39 356 5.1 -9 675.20 -44.9 -44.7 -45.0 68 -99 SPO 1997 04 09 00 40 357 5.3 -9 675.20 -44.9 -44.7 -45.0 67 -99 SPO 1997 04 09 00 41 357 5.6 -9 675.20 -44.9 -44.7 -45.0 67 -99 SPO 1997 04 09 00 42 357 5.6 -9 675.20 -44.9 -44.6 -45.0 67 -99 SPO 1997 04 09 00 43 356 5.9 -9 675.20 -44.9 -44.7 -45.0 66 -99 SPO 1997 04 09 00 44 356 5.7 -9 675.20 -44.9 -44.7 -45.0 66 -99 SPO 1997 04 09 00 45 357 6.0 -9 675.20 -44.9 -44.8 -45.0 67 -99 SPO 1997 04 09 00 46 356 5.9 -9 675.20 -44.9 -44.8 -45.0 67 -99 SPO 1997 04 09 00 47 357 5.7 -9 675.10 -44.9 -44.8 -45.0 67 -99 SPO 1997 04 09 00 48 357 5.7 -9 675.10 -44.9 -44.8 -45.1 67 -99 SPO 1997 04 09 00 49 357 5.7 -9 675.10 -45.0 -44.8 -45.1 68 -99 SPO 1997 04 09 00 50 357 5.4 -9 675.10 -44.9 -44.8 -45.1 67 -99 SPO 1997 04 09 00 51 356 5.2 -9 675.20 -45.0 -44.9 -45.1 68 -99 SPO 1997 04 09 00 52 354 5.0 -9 675.20 -45.0 -44.9 -45.1 68 -99 SPO 1997 04 09 00 53 353 4.7 -9 675.20 -45.0 -44.9 -45.1 68 -99 SPO 1997 04 09 00 54 351 4.7 -9 675.20 -45.1 -45.0 -45.2 69 -99 SPO 1997 04 09 00 55 352 4.9 -9 675.20 -45.1 -45.0 -45.2 68 -99 SPO 1997 04 09 00 56 351 5.0 -9 675.20 -45.1 -44.9 -45.2 67 -99 SPO 1997 04 09 00 57 353 5.0 -9 675.10 -45.1 -44.9 -45.2 66 -99 SPO 1997 04 09 00 58 353 5.0 -9 675.10 -45.1 -44.9 -45.2 66 -99 SPO 1997 04 09 00 59 354 5.2 -9 675.10 -45.1 -44.9 -45.2 67 -99 SPO 1997 04 09 01 00 354 5.0 -9 675.10 -45.1 -44.9 -45.2 67 0 SPO 1997 04 09 01 01 355 5.0 -9 675.10 -45.2 -44.9 -45.2 68 -99 SPO 1997 04 09 01 02 355 5.1 -9 675.10 -45.2 -44.9 -45.2 68 -99 SPO 1997 04 09 01 03 356 5.0 -9 675.10 -45.2 -44.9 -45.2 68 -99 SPO 1997 04 09 01 04 356 5.0 -9 675.00 -45.2 -44.9 -45.3 67 -99 SPO 1997 04 09 01 05 355 5.1 -9 675.00 -45.2 -44.9 -45.2 67 -99 SPO 1997 04 09 01 06 354 5.1 -9 675.00 -45.2 -45.0 -45.2 68 -99 SPO 1997 04 09 01 07 355 5.1 -9 675.00 -45.2 -45.0 -45.2 68 -99 SPO 1997 04 09 01 08 355 5.1 -9 675.00 -45.2 -45.0 -45.3 68 -99 SPO 1997 04 09 01 09 354 5.1 -9 675.00 -45.2 -45.0 -45.3 68 -99 SPO 1997 04 09 01 10 354 5.2 -9 675.00 -45.2 -45.0 -45.3 66 -99 SPO 1997 04 09 01 11 351 5.2 -9 675.00 -45.2 -45.0 -45.3 66 -99 SPO 1997 04 09 01 12 352 5.8 -9 675.00 -45.2 -44.9 -45.3 66 -99 SPO 1997 04 09 01 13 353 5.8 -9 675.00 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 14 353 5.7 -9 674.90 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 15 353 5.6 -9 674.90 -45.2 -44.7 -45.3 68 -99 SPO 1997 04 09 01 16 354 5.7 -9 674.90 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 17 355 5.6 -9 674.90 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 18 356 5.6 -9 674.90 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 19 355 5.5 -9 674.90 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 20 355 5.6 -9 674.90 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 21 356 5.2 -9 674.90 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 22 357 5.2 -9 674.90 -45.3 -44.8 -45.3 68 -99 SPO 1997 04 09 01 23 357 5.2 -9 674.90 -45.3 -44.9 -45.3 67 -99 SPO 1997 04 09 01 24 357 5.5 -9 674.80 -45.2 -44.8 -45.3 66 -99 SPO 1997 04 09 01 25 356 5.5 -9 674.80 -45.2 -44.8 -45.3 66 -99 SPO 1997 04 09 01 26 355 5.7 -9 674.80 -45.2 -44.8 -45.3 66 -99 SPO 1997 04 09 01 27 354 5.7 -9 674.80 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 28 353 5.6 -9 674.80 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 29 354 5.7 -9 674.80 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 30 352 5.6 -9 674.80 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 31 351 5.5 -9 674.80 -45.2 -44.9 -45.3 68 -99 SPO 1997 04 09 01 32 350 5.7 -9 674.80 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 33 349 5.6 -9 674.80 -45.2 -44.8 -45.3 68 -99 SPO 1997 04 09 01 34 348 5.6 -9 674.80 -45.2 -44.8 -45.3 67 -99 SPO 1997 04 09 01 35 349 5.5 -9 674.80 -45.2 -44.7 -45.3 66 -99 SPO 1997 04 09 01 36 348 5.8 -9 674.80 -45.2 -44.6 -45.3 66 -99 SPO 1997 04 09 01 37 349 5.8 -9 674.70 -45.2 -44.6 -45.2 66 -99 SPO 1997 04 09 01 38 348 6.0 -9 674.70 -45.2 -44.6 -45.3 67 -99 SPO 1997 04 09 01 39 348 6.1 -9 674.70 -45.2 -44.5 -45.2 68 -99 SPO 1997 04 09 01 40 347 6.1 -9 674.70 -45.2 -44.4 -45.2 68 -99 SPO 1997 04 09 01 41 347 6.1 -9 674.70 -45.2 -44.4 -45.2 68 -99 SPO 1997 04 09 01 42 347 6.0 -9 674.70 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 01 43 347 6.1 -9 674.70 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 01 44 347 6.2 -9 674.70 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 01 45 347 6.1 -9 674.60 -45.1 -44.5 -45.2 68 -99 SPO 1997 04 09 01 46 347 6.0 -9 674.60 -45.1 -44.6 -45.2 68 -99 SPO 1997 04 09 01 47 347 6.0 -9 674.60 -45.1 -44.7 -45.1 68 -99 SPO 1997 04 09 01 48 347 6.1 -9 674.60 -45.1 -44.7 -45.2 67 -99 SPO 1997 04 09 01 49 346 6.2 -9 674.60 -45.0 -44.7 -45.2 67 -99 SPO 1997 04 09 01 50 346 6.1 -9 674.50 -45.0 -44.6 -45.2 67 -99 SPO 1997 04 09 01 51 345 6.1 -9 674.50 -45.0 -44.6 -45.2 67 -99 SPO 1997 04 09 01 52 345 6.0 -9 674.50 -45.1 -44.6 -45.2 67 -99 SPO 1997 04 09 01 53 344 6.1 -9 674.50 -45.1 -44.6 -45.2 68 -99 SPO 1997 04 09 01 54 343 6.4 -9 674.50 -45.1 -44.6 -45.2 67 -99 SPO 1997 04 09 01 55 343 6.4 -9 674.50 -45.1 -44.5 -45.2 67 -99 SPO 1997 04 09 01 56 343 6.5 -9 674.50 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 01 57 343 6.7 -9 674.50 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 01 58 343 6.7 -9 674.50 -45.1 -44.3 -45.2 68 -99 SPO 1997 04 09 01 59 343 6.8 -9 674.50 -45.1 -44.2 -45.2 67 -99 SPO 1997 04 09 02 00 342 6.8 -9 674.40 -45.1 -44.2 -45.2 67 0 SPO 1997 04 09 02 01 341 6.7 -9 674.50 -45.1 -44.1 -45.2 66 -99 SPO 1997 04 09 02 02 342 6.7 -9 674.40 -45.1 -44.1 -45.2 66 -99 SPO 1997 04 09 02 03 342 6.7 -9 674.40 -45.1 -44.0 -45.2 66 -99 SPO 1997 04 09 02 04 344 6.7 -9 674.40 -45.1 -44.0 -45.2 66 -99 SPO 1997 04 09 02 05 344 6.6 -9 674.40 -45.1 -44.0 -45.2 66 -99 SPO 1997 04 09 02 06 345 6.6 -9 674.40 -45.1 -44.1 -45.2 66 -99 SPO 1997 04 09 02 07 346 6.5 -9 674.40 -45.1 -44.2 -45.2 67 -99 SPO 1997 04 09 02 08 347 6.5 -9 674.40 -45.1 -44.3 -45.2 68 -99 SPO 1997 04 09 02 09 348 6.6 -9 674.40 -45.1 -44.3 -45.2 67 -99 SPO 1997 04 09 02 10 347 6.5 -9 674.40 -45.1 -44.3 -45.2 67 -99 SPO 1997 04 09 02 11 347 6.5 -9 674.40 -45.1 -44.3 -45.2 67 -99 SPO 1997 04 09 02 12 346 6.4 -9 674.40 -45.1 -44.3 -45.2 67 -99 SPO 1997 04 09 02 13 346 6.2 -9 674.40 -45.1 -44.3 -45.2 67 -99 SPO 1997 04 09 02 14 346 6.1 -9 674.40 -45.1 -44.4 -45.2 66 -99 SPO 1997 04 09 02 15 346 6.0 -9 674.40 -45.1 -44.3 -45.1 66 -99 SPO 1997 04 09 02 16 346 5.9 -9 674.40 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 02 17 347 5.7 -9 674.50 -45.1 -44.4 -45.2 67 -99 SPO 1997 04 09 02 18 347 5.8 -9 674.50 -45.1 -44.4 -45.2 68 -99 SPO 1997 04 09 02 19 348 5.7 -9 674.40 -45.1 -44.4 -45.1 68 -99 SPO 1997 04 09 02 20 348 5.5 -9 674.50 -45.1 -44.5 -45.2 68 -99 SPO 1997 04 09 02 21 347 5.3 -9 674.40 -45.1 -44.5 -45.2 68 -99 SPO 1997 04 09 02 22 347 5.4 -9 674.40 -45.1 -44.4 -45.2 68 -99 SPO 1997 04 09 02 23 346 5.4 -9 674.50 -45.1 -44.5 -45.2 68 -99 SPO 1997 04 09 02 24 346 5.4 -9 674.50 -45.1 -44.5 -45.2 68 -99 SPO 1997 04 09 02 25 347 5.4 -9 674.50 -45.1 -44.5 -45.2 67 -99 SPO 1997 04 09 02 26 347 5.5 -9 674.50 -45.1 -44.5 -45.2 67 -99 SPO 1997 04 09 02 27 348 5.5 -9 674.40 -45.1 -44.5 -45.2 67 -99 SPO 1997 04 09 02 28 349 5.6 -9 674.40 -45.1 -44.6 -45.2 67 -99 SPO 1997 04 09 02 29 348 5.4 -9 674.40 -45.1 -44.6 -45.2 66 -99 SPO 1997 04 09 02 30 347 5.6 -9 674.40 -45.1 -44.6 -45.2 66 -99 SPO 1997 04 09 02 31 348 5.4 -9 674.40 -45.1 -44.6 -45.2 67 -99 SPO 1997 04 09 02 32 347 5.4 -9 674.40 -45.1 -44.7 -45.2 68 -99 SPO 1997 04 09 02 33 347 5.5 -9 674.40 -45.1 -44.7 -45.2 68 -99 SPO 1997 04 09 02 34 347 5.5 -9 674.40 -45.1 -44.6 -45.2 67 -99 SPO 1997 04 09 02 35 346 5.5 -9 674.40 -45.2 -44.6 -45.2 68 -99 SPO 1997 04 09 02 36 347 5.4 -9 674.40 -45.2 -44.6 -45.2 68 -99 SPO 1997 04 09 02 37 347 5.5 -9 674.40 -45.2 -44.6 -45.3 68 -99 SPO 1997 04 09 02 38 348 5.6 -9 674.40 -45.2 -44.6 -45.3 68 -99 SPO 1997 04 09 02 39 348 5.6 -9 674.40 -45.2 -44.5 -45.3 68 -99 SPO 1997 04 09 02 40 347 5.8 -9 674.40 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 02 41 346 6.0 -9 674.30 -45.2 -44.5 -45.3 66 -99 SPO 1997 04 09 02 42 345 6.0 -9 674.30 -45.2 -44.4 -45.3 66 -99 SPO 1997 04 09 02 43 345 6.1 -9 674.30 -45.2 -44.5 -45.3 66 -99 SPO 1997 04 09 02 44 345 6.3 -9 674.30 -45.2 -44.4 -45.3 66 -99 SPO 1997 04 09 02 45 345 6.1 -9 674.30 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 02 46 345 6.0 -9 674.30 -45.2 -44.5 -45.3 66 -99 SPO 1997 04 09 02 47 344 6.0 -9 674.30 -45.2 -44.5 -45.3 66 -99 SPO 1997 04 09 02 48 345 6.1 -9 674.30 -45.3 -44.6 -45.4 68 -99 SPO 1997 04 09 02 49 346 6.1 -9 674.30 -45.3 -44.6 -45.4 68 -99 SPO 1997 04 09 02 50 346 6.2 -9 674.30 -45.3 -44.6 -45.4 68 -99 SPO 1997 04 09 02 51 347 6.2 -9 674.30 -45.3 -44.6 -45.4 67 -99 SPO 1997 04 09 02 52 348 6.1 -9 674.20 -45.4 -44.6 -45.4 68 -99 SPO 1997 04 09 02 53 348 6.0 -9 674.20 -45.4 -44.6 -45.5 67 -99 SPO 1997 04 09 02 54 347 5.9 -9 674.20 -45.4 -44.6 -45.5 66 -99 SPO 1997 04 09 02 55 346 6.0 -9 674.20 -45.5 -44.6 -45.5 67 -99 SPO 1997 04 09 02 56 345 6.0 -9 674.20 -45.5 -44.7 -45.6 66 -99 SPO 1997 04 09 02 57 345 6.0 -9 674.20 -45.5 -44.7 -45.6 67 -99 SPO 1997 04 09 02 58 345 5.9 -9 674.20 -45.5 -44.7 -45.6 67 -99 SPO 1997 04 09 02 59 344 5.9 -9 674.20 -45.5 -44.7 -45.6 67 -99 SPO 1997 04 09 03 00 345 6.0 -9 674.20 -45.5 -44.7 -45.6 67 0 SPO 1997 04 09 03 01 345 6.2 -9 674.20 -45.6 -44.7 -45.6 68 -99 SPO 1997 04 09 03 02 345 6.4 -9 674.10 -45.6 -44.6 -45.7 68 -99 SPO 1997 04 09 03 03 345 6.4 -9 674.10 -45.6 -44.6 -45.7 68 -99 SPO 1997 04 09 03 04 344 6.3 -9 674.10 -45.6 -44.6 -45.7 67 -99 SPO 1997 04 09 03 05 344 6.3 -9 674.10 -45.6 -44.5 -45.7 67 -99 SPO 1997 04 09 03 06 344 6.3 -9 674.10 -45.6 -44.5 -45.6 67 -99 SPO 1997 04 09 03 07 343 6.3 -9 674.10 -45.6 -44.4 -45.6 66 -99 SPO 1997 04 09 03 08 344 6.5 -9 674.10 -45.6 -44.4 -45.6 66 -99 SPO 1997 04 09 03 09 344 6.5 -9 674.10 -45.6 -44.5 -45.6 66 -99 SPO 1997 04 09 03 10 344 6.5 -9 674.10 -45.5 -44.5 -45.6 66 -99 SPO 1997 04 09 03 11 343 6.5 -9 674.10 -45.5 -44.4 -45.6 67 -99 SPO 1997 04 09 03 12 344 6.5 -9 674.00 -45.5 -44.4 -45.6 67 -99 SPO 1997 04 09 03 13 344 6.4 -9 674.00 -45.5 -44.5 -45.6 67 -99 SPO 1997 04 09 03 14 343 6.3 -9 674.00 -45.5 -44.5 -45.6 67 -99 SPO 1997 04 09 03 15 343 6.1 -9 674.00 -45.5 -44.5 -45.6 67 -99 SPO 1997 04 09 03 16 343 6.2 -9 674.00 -45.5 -44.5 -45.6 67 -99 SPO 1997 04 09 03 17 345 6.2 -9 674.00 -45.5 -44.5 -45.6 67 -99 SPO 1997 04 09 03 18 345 6.2 -9 674.00 -45.5 -44.5 -45.6 67 -99 SPO 1997 04 09 03 19 346 6.2 -9 674.00 -45.6 -44.5 -45.6 69 -99 SPO 1997 04 09 03 20 346 6.0 -9 674.00 -45.6 -44.5 -45.6 68 -99 SPO 1997 04 09 03 21 346 6.3 -9 674.00 -45.6 -44.5 -45.7 67 -99 SPO 1997 04 09 03 22 345 6.3 -9 674.00 -45.6 -44.5 -45.6 66 -99 SPO 1997 04 09 03 23 345 6.2 -9 674.00 -45.6 -44.4 -45.6 67 -99 SPO 1997 04 09 03 24 344 6.1 -9 674.00 -45.6 -44.4 -45.6 67 -99 SPO 1997 04 09 03 25 344 6.0 -9 674.00 -45.6 -44.4 -45.7 67 -99 SPO 1997 04 09 03 26 345 6.1 -9 674.00 -45.6 -44.3 -45.7 67 -99 SPO 1997 04 09 03 27 346 6.1 -9 674.00 -45.6 -44.3 -45.7 67 -99 SPO 1997 04 09 03 28 346 6.1 -9 674.00 -45.6 -44.4 -45.7 66 -99 SPO 1997 04 09 03 29 347 6.0 -9 674.00 -45.6 -44.5 -45.7 67 -99 SPO 1997 04 09 03 30 348 5.9 -9 674.00 -45.6 -44.5 -45.7 67 -99 SPO 1997 04 09 03 31 349 6.0 -9 674.00 -45.7 -44.6 -45.8 67 -99 SPO 1997 04 09 03 32 350 6.2 -9 674.00 -45.7 -44.6 -45.8 67 -99 SPO 1997 04 09 03 33 350 6.0 -9 674.00 -45.7 -44.6 -45.8 66 -99 SPO 1997 04 09 03 34 350 6.1 -9 674.00 -45.7 -44.6 -45.8 66 -99 SPO 1997 04 09 03 35 350 6.2 -9 674.00 -45.8 -44.6 -45.8 66 -99 SPO 1997 04 09 03 36 351 6.2 -9 673.90 -45.8 -44.5 -45.8 66 -99 SPO 1997 04 09 03 37 351 6.3 -9 673.90 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 03 38 352 6.4 -9 673.90 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 03 39 353 6.5 -9 673.90 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 03 40 353 6.4 -9 673.90 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 03 41 352 6.3 -9 673.90 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 03 42 352 6.2 -9 673.90 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 03 43 351 6.3 -9 673.90 -45.8 -44.4 -45.9 67 -99 SPO 1997 04 09 03 44 351 6.3 -9 673.90 -45.8 -44.4 -45.9 67 -99 SPO 1997 04 09 03 45 351 6.3 -9 673.90 -45.8 -44.4 -45.9 67 -99 SPO 1997 04 09 03 46 352 6.2 -9 673.90 -45.8 -44.4 -45.9 66 -99 SPO 1997 04 09 03 47 353 6.4 -9 673.90 -45.8 -44.4 -45.9 66 -99 SPO 1997 04 09 03 48 353 6.3 -9 673.90 -45.8 -44.5 -45.9 66 -99 SPO 1997 04 09 03 49 354 6.1 -9 673.90 -45.8 -44.6 -45.9 66 -99 SPO 1997 04 09 03 50 355 6.2 -9 673.90 -45.8 -44.6 -45.9 66 -99 SPO 1997 04 09 03 51 354 6.2 -9 673.90 -45.8 -44.6 -45.9 66 -99 SPO 1997 04 09 03 52 352 6.2 -9 673.80 -45.8 -44.6 -45.9 67 -99 SPO 1997 04 09 03 53 353 6.2 -9 673.80 -45.8 -44.7 -45.9 66 -99 SPO 1997 04 09 03 54 352 6.3 -9 673.80 -45.8 -44.7 -45.9 66 -99 SPO 1997 04 09 03 55 351 6.1 -9 673.80 -45.8 -44.7 -45.9 66 -99 SPO 1997 04 09 03 56 351 6.3 -9 673.80 -45.8 -44.7 -45.9 67 -99 SPO 1997 04 09 03 57 352 6.3 -9 673.80 -45.8 -44.7 -45.9 67 -99 SPO 1997 04 09 03 58 354 6.2 -9 673.80 -45.8 -44.6 -45.8 68 -99 SPO 1997 04 09 03 59 353 6.2 -9 673.70 -45.8 -44.7 -45.9 67 -99 SPO 1997 04 09 04 00 353 6.2 -9 673.70 -45.8 -44.7 -45.9 66 0 SPO 1997 04 09 04 01 351 6.0 -9 673.70 -45.8 -44.8 -45.9 66 -99 SPO 1997 04 09 04 02 350 6.0 -9 673.70 -45.8 -44.8 -45.9 66 -99 SPO 1997 04 09 04 03 351 6.0 -9 673.70 -45.8 -44.8 -45.8 67 -99 SPO 1997 04 09 04 04 352 6.0 -9 673.70 -45.8 -44.8 -45.9 68 -99 SPO 1997 04 09 04 05 352 6.0 -9 673.70 -45.8 -44.8 -45.9 68 -99 SPO 1997 04 09 04 06 352 5.8 -9 673.70 -45.8 -44.9 -45.9 67 -99 SPO 1997 04 09 04 07 351 5.8 -9 673.70 -45.8 -44.9 -45.9 66 -99 SPO 1997 04 09 04 08 351 5.9 -9 673.70 -45.8 -44.9 -45.8 66 -99 SPO 1997 04 09 04 09 350 6.0 -9 673.70 -45.8 -44.9 -45.8 67 -99 SPO 1997 04 09 04 10 350 6.0 -9 673.70 -45.8 -44.9 -45.9 67 -99 SPO 1997 04 09 04 11 349 5.9 -9 673.70 -45.8 -45.0 -45.9 67 -99 SPO 1997 04 09 04 12 349 6.1 -9 673.70 -45.8 -45.0 -45.9 67 -99 SPO 1997 04 09 04 13 350 6.2 -9 673.70 -45.8 -45.0 -45.9 67 -99 SPO 1997 04 09 04 14 350 6.0 -9 673.70 -45.8 -44.9 -45.9 67 -99 SPO 1997 04 09 04 15 349 6.0 -9 673.70 -45.8 -45.0 -45.9 66 -99 SPO 1997 04 09 04 16 349 6.0 -9 673.70 -45.8 -45.0 -45.9 67 -99 SPO 1997 04 09 04 17 348 6.0 -9 673.70 -45.9 -45.0 -46.0 68 -99 SPO 1997 04 09 04 18 348 5.8 -9 673.70 -45.9 -45.0 -46.0 68 -99 SPO 1997 04 09 04 19 349 6.0 -9 673.70 -45.9 -45.1 -46.0 68 -99 SPO 1997 04 09 04 20 350 5.9 -9 673.70 -45.9 -45.2 -46.0 68 -99 SPO 1997 04 09 04 21 352 5.9 -9 673.70 -45.9 -45.1 -46.0 67 -99 SPO 1997 04 09 04 22 353 6.0 -9 673.60 -45.9 -45.1 -46.0 67 -99 SPO 1997 04 09 04 23 354 6.0 -9 673.60 -45.9 -45.1 -46.0 67 -99 SPO 1997 04 09 04 24 354 6.0 -9 673.60 -45.9 -45.1 -46.0 68 -99 SPO 1997 04 09 04 25 354 5.8 -9 673.60 -46.0 -45.1 -46.1 68 -99 SPO 1997 04 09 04 26 353 6.2 -9 673.60 -46.0 -45.0 -46.1 67 -99 SPO 1997 04 09 04 27 352 6.0 -9 673.60 -46.0 -45.0 -46.1 66 -99 SPO 1997 04 09 04 28 351 6.2 -9 673.60 -46.0 -45.0 -46.1 66 -99 SPO 1997 04 09 04 29 351 6.2 -9 673.60 -46.0 -45.1 -46.0 67 -99 SPO 1997 04 09 04 30 351 6.0 -9 673.60 -46.0 -45.1 -46.1 67 -99 SPO 1997 04 09 04 31 353 6.1 -9 673.60 -46.0 -45.1 -46.1 68 -99 SPO 1997 04 09 04 32 353 6.0 -9 673.60 -46.0 -45.2 -46.1 67 -99 SPO 1997 04 09 04 33 354 5.9 -9 673.60 -46.0 -45.2 -46.1 68 -99 SPO 1997 04 09 04 34 355 5.9 -9 673.60 -46.0 -45.2 -46.1 68 -99 SPO 1997 04 09 04 35 354 5.9 -9 673.50 -46.0 -45.2 -46.1 68 -99 SPO 1997 04 09 04 36 354 5.9 -9 673.50 -46.0 -45.3 -46.1 68 -99 SPO 1997 04 09 04 37 354 6.1 -9 673.50 -46.0 -45.3 -46.1 68 -99 SPO 1997 04 09 04 38 353 6.2 -9 673.50 -46.0 -45.3 -46.1 66 -99 SPO 1997 04 09 04 39 353 6.2 -9 673.50 -46.0 -45.4 -46.1 66 -99 SPO 1997 04 09 04 40 351 6.2 -9 673.50 -46.0 -45.4 -46.0 66 -99 SPO 1997 04 09 04 41 351 6.3 -9 673.50 -46.0 -45.4 -46.0 66 -99 SPO 1997 04 09 04 42 351 6.4 -9 673.50 -46.0 -45.4 -46.1 67 -99 SPO 1997 04 09 04 43 349 6.2 -9 673.40 -46.0 -45.3 -46.1 68 -99 SPO 1997 04 09 04 44 350 6.1 -9 673.40 -46.0 -45.4 -46.1 68 -99 SPO 1997 04 09 04 45 350 6.2 -9 673.40 -46.0 -45.4 -46.1 68 -99 SPO 1997 04 09 04 46 350 6.0 -9 673.40 -46.0 -45.4 -46.1 68 -99 SPO 1997 04 09 04 47 351 6.1 -9 673.40 -46.0 -45.5 -46.1 67 -99 SPO 1997 04 09 04 48 351 6.1 -9 673.40 -46.0 -45.6 -46.1 67 -99 SPO 1997 04 09 04 49 350 5.8 -9 673.40 -46.0 -45.6 -46.1 67 -99 SPO 1997 04 09 04 50 352 6.2 -9 673.40 -46.0 -45.7 -46.2 67 -99 SPO 1997 04 09 04 51 354 6.3 -9 673.40 -46.1 -45.6 -46.2 67 -99 SPO 1997 04 09 04 52 354 6.2 -9 673.40 -46.1 -45.6 -46.2 66 -99 SPO 1997 04 09 04 53 353 6.1 -9 673.40 -46.1 -45.6 -46.2 66 -99 SPO 1997 04 09 04 54 351 6.1 -9 673.40 -46.1 -45.7 -46.2 66 -99 SPO 1997 04 09 04 55 350 6.3 -9 673.40 -46.2 -45.7 -46.2 67 -99 SPO 1997 04 09 04 56 349 6.3 -9 673.40 -46.2 -45.7 -46.2 67 -99 SPO 1997 04 09 04 57 348 6.4 -9 673.40 -46.2 -45.6 -46.2 67 -99 SPO 1997 04 09 04 58 347 6.3 -9 673.40 -46.2 -45.6 -46.2 67 -99 SPO 1997 04 09 04 59 348 6.3 -9 673.40 -46.2 -45.6 -46.2 68 -99 SPO 1997 04 09 05 00 350 6.5 -9 673.40 -46.2 -45.6 -46.2 68 0 SPO 1997 04 09 05 01 351 6.6 -9 673.40 -46.2 -45.5 -46.2 68 -99 SPO 1997 04 09 05 02 351 6.6 -9 673.40 -46.2 -45.5 -46.2 68 -99 SPO 1997 04 09 05 03 351 6.3 -9 673.40 -46.2 -45.5 -46.2 68 -99 SPO 1997 04 09 05 04 352 6.2 -9 673.40 -46.2 -45.5 -46.2 68 -99 SPO 1997 04 09 05 05 352 6.3 -9 673.40 -46.2 -45.5 -46.2 67 -99 SPO 1997 04 09 05 06 352 6.2 -9 673.30 -46.2 -45.5 -46.2 67 -99 SPO 1997 04 09 05 07 352 6.2 -9 673.40 -46.2 -45.5 -46.2 67 -99 SPO 1997 04 09 05 08 352 6.1 -9 673.30 -46.2 -45.6 -46.2 67 -99 SPO 1997 04 09 05 09 353 5.9 -9 673.30 -46.2 -45.6 -46.3 68 -99 SPO 1997 04 09 05 10 353 5.9 -9 673.30 -46.2 -45.7 -46.3 68 -99 SPO 1997 04 09 05 11 353 5.9 -9 673.30 -46.2 -45.8 -46.3 67 -99 SPO 1997 04 09 05 12 353 6.0 -9 673.30 -46.2 -45.8 -46.3 67 -99 SPO 1997 04 09 05 13 353 6.0 -9 673.30 -46.2 -45.8 -46.3 66 -99 SPO 1997 04 09 05 14 353 6.2 -9 673.30 -46.2 -45.7 -46.3 67 -99 SPO 1997 04 09 05 15 353 6.3 -9 673.30 -46.2 -45.6 -46.3 67 -99 SPO 1997 04 09 05 16 353 6.4 -9 673.30 -46.2 -45.5 -46.3 67 -99 SPO 1997 04 09 05 17 353 6.5 -9 673.30 -46.2 -45.4 -46.3 66 -99 SPO 1997 04 09 05 18 352 6.3 -9 673.30 -46.2 -45.3 -46.3 66 -99 SPO 1997 04 09 05 19 352 6.3 -9 673.30 -46.2 -45.3 -46.2 66 -99 SPO 1997 04 09 05 20 351 6.5 -9 673.30 -46.2 -45.3 -46.2 66 -99 SPO 1997 04 09 05 21 352 6.5 -9 673.30 -46.2 -45.3 -46.2 67 -99 SPO 1997 04 09 05 22 352 6.5 -9 673.30 -46.2 -45.2 -46.2 67 -99 SPO 1997 04 09 05 23 351 6.3 -9 673.30 -46.1 -45.2 -46.2 67 -99 SPO 1997 04 09 05 24 351 6.2 -9 673.30 -46.1 -45.2 -46.2 67 -99 SPO 1997 04 09 05 25 354 6.4 -9 673.30 -46.1 -45.2 -46.2 67 -99 SPO 1997 04 09 05 26 354 6.4 -9 673.30 -46.1 -45.1 -46.1 68 -99 SPO 1997 04 09 05 27 354 6.4 -9 673.30 -46.1 -45.2 -46.2 68 -99 SPO 1997 04 09 05 28 356 6.4 -9 673.30 -46.1 -45.2 -46.2 67 -99 SPO 1997 04 09 05 29 357 6.4 -9 673.30 -46.1 -45.2 -46.1 67 -99 SPO 1997 04 09 05 30 357 6.2 -9 673.30 -46.0 -45.3 -46.1 66 -99 SPO 1997 04 09 05 31 357 6.1 -9 673.30 -46.0 -45.4 -46.2 66 -99 SPO 1997 04 09 05 32 357 6.4 -9 673.20 -46.1 -45.5 -46.2 67 -99 SPO 1997 04 09 05 33 358 6.5 -9 673.20 -46.0 -45.4 -46.1 67 -99 SPO 1997 04 09 05 34 358 6.3 -9 673.20 -46.1 -45.6 -46.1 68 -99 SPO 1997 04 09 05 35 357 6.4 -9 673.20 -46.0 -45.6 -46.1 67 -99 SPO 1997 04 09 05 36 356 6.3 -9 673.20 -46.0 -45.6 -46.1 67 -99 SPO 1997 04 09 05 37 356 6.2 -9 673.20 -46.1 -45.7 -46.1 68 -99 SPO 1997 04 09 05 38 356 6.1 -9 673.20 -46.0 -45.8 -46.1 67 -99 SPO 1997 04 09 05 39 356 5.9 -9 673.30 -46.0 -45.8 -46.1 68 -99 SPO 1997 04 09 05 40 357 5.8 -9 673.30 -46.0 -45.8 -46.1 68 -99 SPO 1997 04 09 05 41 356 6.0 -9 673.30 -46.0 -45.8 -46.1 68 -99 SPO 1997 04 09 05 42 356 5.8 -9 673.30 -46.0 -45.8 -46.1 67 -99 SPO 1997 04 09 05 43 355 5.8 -9 673.30 -46.0 -45.8 -46.1 67 -99 SPO 1997 04 09 05 44 355 6.0 -9 673.30 -46.0 -45.8 -46.1 67 -99 SPO 1997 04 09 05 45 354 5.8 -9 673.30 -46.0 -45.8 -46.1 67 -99 SPO 1997 04 09 05 46 355 6.0 -9 673.30 -46.0 -45.8 -46.0 68 -99 SPO 1997 04 09 05 47 355 6.0 -9 673.30 -46.0 -45.8 -46.0 68 -99 SPO 1997 04 09 05 48 356 6.0 -9 673.20 -45.9 -45.8 -46.0 67 -99 SPO 1997 04 09 05 49 356 5.8 -9 673.20 -45.9 -45.8 -46.0 67 -99 SPO 1997 04 09 05 50 355 5.9 -9 673.20 -45.9 -45.9 -46.0 68 -99 SPO 1997 04 09 05 51 354 5.8 -9 673.30 -45.9 -46.0 -46.0 69 -99 SPO 1997 04 09 05 52 357 6.1 -9 673.20 -45.9 -46.0 -46.0 68 -99 SPO 1997 04 09 05 53 357 5.9 -9 673.20 -45.9 -45.9 -46.0 68 -99 SPO 1997 04 09 05 54 357 6.0 -9 673.20 -45.8 -45.9 -46.0 67 -99 SPO 1997 04 09 05 55 354 5.9 -9 673.20 -45.8 -46.0 -45.9 66 -99 SPO 1997 04 09 05 56 352 5.9 -9 673.20 -45.8 -46.0 -45.9 66 -99 SPO 1997 04 09 05 57 351 6.1 -9 673.20 -45.8 -46.0 -45.9 66 -99 SPO 1997 04 09 05 58 354 6.1 -9 673.20 -45.8 -45.9 -45.9 66 -99 SPO 1997 04 09 05 59 354 6.5 -9 673.20 -45.8 -45.9 -45.9 68 -99 SPO 1997 04 09 06 00 354 6.4 -9 673.20 -45.8 -45.9 -45.9 68 0 SPO 1997 04 09 06 01 353 6.1 -9 673.20 -45.8 -45.9 -45.9 68 -99 SPO 1997 04 09 06 02 353 6.4 -9 673.20 -45.8 -45.9 -45.9 68 -99 SPO 1997 04 09 06 03 354 6.4 -9 673.20 -45.8 -45.9 -45.8 68 -99 SPO 1997 04 09 06 04 355 6.3 -9 673.20 -45.8 -45.9 -45.8 68 -99 SPO 1997 04 09 06 05 354 6.5 -9 673.20 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 06 06 353 6.7 -9 673.20 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 06 07 352 6.6 -9 673.20 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 06 08 352 6.6 -9 673.20 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 06 09 352 6.4 -9 673.20 -45.6 -45.8 -45.8 66 -99 SPO 1997 04 09 06 10 351 6.7 -9 673.20 -45.6 -45.8 -45.7 66 -99 SPO 1997 04 09 06 11 352 6.7 -9 673.20 -45.6 -45.8 -45.7 66 -99 SPO 1997 04 09 06 12 352 6.6 -9 673.20 -45.6 -45.8 -45.8 68 -99 SPO 1997 04 09 06 13 351 6.5 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 14 352 6.8 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 15 352 6.6 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 16 350 6.7 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 17 351 6.8 -9 673.20 -45.6 -45.8 -45.7 67 -99 SPO 1997 04 09 06 18 351 6.8 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 19 351 6.7 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 20 351 6.9 -9 673.20 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 21 351 6.8 -9 673.20 -45.6 -45.8 -45.7 67 -99 SPO 1997 04 09 06 22 352 7.0 -9 673.10 -45.6 -45.7 -45.7 67 -99 SPO 1997 04 09 06 23 351 7.0 -9 673.10 -45.6 -45.7 -45.7 67 -99 SPO 1997 04 09 06 24 350 7.0 -9 673.10 -45.6 -45.7 -45.6 68 -99 SPO 1997 04 09 06 25 350 7.0 -9 673.10 -45.6 -45.7 -45.6 69 -99 SPO 1997 04 09 06 26 349 7.0 -9 673.10 -45.6 -45.6 -45.6 69 -99 SPO 1997 04 09 06 27 349 6.9 -9 673.10 -45.5 -45.6 -45.6 69 -99 SPO 1997 04 09 06 28 349 7.2 -9 673.10 -45.5 -45.7 -45.6 69 -99 SPO 1997 04 09 06 29 350 7.1 -9 673.10 -45.5 -45.7 -45.6 69 -99 SPO 1997 04 09 06 30 349 7.2 -9 673.10 -45.5 -45.7 -45.6 67 -99 SPO 1997 04 09 06 31 349 7.2 -9 673.10 -45.5 -45.8 -45.6 68 -99 SPO 1997 04 09 06 32 350 7.0 -9 673.10 -45.5 -45.8 -45.6 68 -99 SPO 1997 04 09 06 33 350 7.5 -9 673.10 -45.5 -45.8 -45.6 67 -99 SPO 1997 04 09 06 34 350 7.2 -9 673.00 -45.5 -45.8 -45.6 67 -99 SPO 1997 04 09 06 35 351 7.2 -9 673.00 -45.5 -45.8 -45.6 66 -99 SPO 1997 04 09 06 36 352 6.9 -9 673.00 -45.5 -45.8 -45.6 66 -99 SPO 1997 04 09 06 37 350 7.0 -9 673.00 -45.5 -45.8 -45.6 67 -99 SPO 1997 04 09 06 38 350 7.3 -9 673.00 -45.5 -45.8 -45.6 67 -99 SPO 1997 04 09 06 39 350 7.4 -9 673.00 -45.5 -45.8 -45.6 68 -99 SPO 1997 04 09 06 40 350 7.4 -9 673.00 -45.5 -45.8 -45.6 68 -99 SPO 1997 04 09 06 41 352 6.9 -9 673.00 -45.6 -45.8 -45.6 69 -99 SPO 1997 04 09 06 42 353 7.6 -9 673.00 -45.5 -45.8 -45.7 68 -99 SPO 1997 04 09 06 43 353 7.4 -9 673.00 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 44 353 6.9 -9 673.00 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 45 354 7.0 -9 673.00 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 46 354 7.0 -9 673.00 -45.6 -45.8 -45.7 68 -99 SPO 1997 04 09 06 47 354 7.0 -9 673.00 -45.6 -45.8 -45.8 67 -99 SPO 1997 04 09 06 48 355 6.8 -9 673.00 -45.6 -45.8 -45.8 66 -99 SPO 1997 04 09 06 49 355 7.1 -9 673.00 -45.6 -45.8 -45.8 66 -99 SPO 1997 04 09 06 50 354 7.3 -9 673.00 -45.7 -45.9 -45.8 67 -99 SPO 1997 04 09 06 51 354 7.4 -9 673.00 -45.7 -45.9 -45.8 67 -99 SPO 1997 04 09 06 52 354 7.3 -9 672.90 -45.7 -46.0 -45.8 67 -99 SPO 1997 04 09 06 53 355 7.3 -9 672.90 -45.8 -46.0 -45.9 68 -99 SPO 1997 04 09 06 54 356 7.3 -9 672.90 -45.8 -46.0 -45.9 68 -99 SPO 1997 04 09 06 55 356 7.3 -9 672.90 -45.8 -46.0 -45.9 68 -99 SPO 1997 04 09 06 56 355 7.6 -9 672.90 -45.8 -46.0 -46.0 68 -99 SPO 1997 04 09 06 57 356 7.4 -9 672.90 -45.8 -46.0 -46.0 68 -99 SPO 1997 04 09 06 58 354 7.5 -9 672.90 -45.9 -46.0 -46.0 69 -99 SPO 1997 04 09 06 59 355 7.5 -9 672.90 -45.9 -46.0 -46.0 68 -99 SPO 1997 04 09 07 00 355 7.5 -9 672.90 -45.9 -46.0 -46.0 68 0 SPO 1997 04 09 07 01 355 7.5 -9 672.90 -45.9 -46.0 -46.0 67 -99 SPO 1997 04 09 07 02 357 7.3 -9 672.80 -45.9 -46.0 -46.0 67 -99 SPO 1997 04 09 07 03 357 7.3 -9 672.80 -46.0 -46.0 -46.0 68 -99 SPO 1997 04 09 07 04 357 7.4 -9 672.80 -46.0 -46.0 -46.1 68 -99 SPO 1997 04 09 07 05 356 7.3 -9 672.80 -46.0 -46.0 -46.1 68 -99 SPO 1997 04 09 07 06 356 7.1 -9 672.80 -46.0 -46.0 -46.1 68 -99 SPO 1997 04 09 07 07 356 7.2 -9 672.80 -46.0 -46.0 -46.1 68 -99 SPO 1997 04 09 07 08 356 7.0 -9 672.80 -46.0 -46.0 -46.1 68 -99 SPO 1997 04 09 07 09 356 7.0 -9 672.80 -46.0 -46.0 -46.1 67 -99 SPO 1997 04 09 07 10 356 6.8 -9 672.80 -46.0 -46.0 -46.1 66 -99 SPO 1997 04 09 07 11 355 7.1 -9 672.80 -46.0 -46.0 -46.1 67 -99 SPO 1997 04 09 07 12 354 6.8 -9 672.80 -46.0 -46.0 -46.1 67 -99 SPO 1997 04 09 07 13 353 6.8 -9 672.80 -46.0 -46.1 -46.1 67 -99 SPO 1997 04 09 07 14 352 6.6 -9 672.80 -46.0 -46.1 -46.1 67 -99 SPO 1997 04 09 07 15 352 6.7 -9 672.90 -46.0 -46.1 -46.1 66 -99 SPO 1997 04 09 07 16 352 6.6 -9 672.80 -46.0 -46.0 -46.1 66 -99 SPO 1997 04 09 07 17 352 7.1 -9 672.80 -46.0 -46.0 -46.1 67 -99 SPO 1997 04 09 07 18 352 7.0 -9 672.80 -46.0 -46.0 -46.1 67 -99 SPO 1997 04 09 07 19 352 7.1 -9 672.80 -46.0 -45.9 -46.1 67 -99 SPO 1997 04 09 07 20 352 7.4 -9 672.80 -46.0 -45.9 -46.1 68 -99 SPO 1997 04 09 07 21 351 7.2 -9 672.80 -46.0 -45.9 -46.1 68 -99 SPO 1997 04 09 07 22 351 7.3 -9 672.80 -46.0 -45.9 -46.0 69 -99 SPO 1997 04 09 07 23 351 7.2 -9 672.80 -46.0 -45.9 -46.0 69 -99 SPO 1997 04 09 07 24 351 7.0 -9 672.80 -46.0 -45.9 -46.0 69 -99 SPO 1997 04 09 07 25 350 6.8 -9 672.80 -46.0 -45.9 -46.0 68 -99 SPO 1997 04 09 07 26 350 7.0 -9 672.80 -45.9 -45.9 -46.0 66 -99 SPO 1997 04 09 07 27 351 7.0 -9 672.80 -46.0 -45.9 -46.0 67 -99 SPO 1997 04 09 07 28 351 6.7 -9 672.80 -45.9 -45.9 -46.0 66 -99 SPO 1997 04 09 07 29 351 6.5 -9 672.80 -45.9 -45.9 -46.0 66 -99 SPO 1997 04 09 07 30 351 6.7 -9 672.80 -45.9 -45.9 -46.0 66 -99 SPO 1997 04 09 07 31 352 6.5 -9 672.80 -45.9 -46.0 -46.0 67 -99 SPO 1997 04 09 07 32 351 6.5 -9 672.80 -45.9 -46.0 -46.0 68 -99 SPO 1997 04 09 07 33 351 6.5 -9 672.80 -45.9 -46.0 -46.0 68 -99 SPO 1997 04 09 07 34 350 6.5 -9 672.70 -45.9 -46.0 -46.0 68 -99 SPO 1997 04 09 07 35 351 6.6 -9 672.80 -45.9 -46.0 -46.0 68 -99 SPO 1997 04 09 07 36 350 6.7 -9 672.80 -45.9 -45.9 -46.0 68 -99 SPO 1997 04 09 07 37 349 6.3 -9 672.80 -45.9 -45.9 -46.0 68 -99 SPO 1997 04 09 07 38 349 6.5 -9 672.80 -45.9 -45.9 -45.9 67 -99 SPO 1997 04 09 07 39 348 6.2 -9 672.80 -45.9 -45.9 -45.9 67 -99 SPO 1997 04 09 07 40 349 6.4 -9 672.80 -45.9 -45.8 -45.9 67 -99 SPO 1997 04 09 07 41 349 6.2 -9 672.80 -45.8 -45.8 -45.9 66 -99 SPO 1997 04 09 07 42 348 6.4 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 43 348 6.4 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 44 348 6.5 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 45 349 6.6 -9 672.80 -45.8 -45.7 -45.9 67 -99 SPO 1997 04 09 07 46 349 6.7 -9 672.80 -45.8 -45.7 -45.9 67 -99 SPO 1997 04 09 07 47 348 6.7 -9 672.80 -45.8 -45.7 -45.9 67 -99 SPO 1997 04 09 07 48 350 6.6 -9 672.70 -45.8 -45.7 -45.9 68 -99 SPO 1997 04 09 07 49 349 6.8 -9 672.80 -45.8 -45.7 -45.9 68 -99 SPO 1997 04 09 07 50 350 6.5 -9 672.80 -45.8 -45.7 -45.9 67 -99 SPO 1997 04 09 07 51 350 6.6 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 52 349 6.6 -9 672.70 -45.8 -45.8 -45.8 67 -99 SPO 1997 04 09 07 53 349 6.4 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 54 348 6.6 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 55 348 6.7 -9 672.80 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 07 56 348 6.4 -9 672.80 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 07 57 348 6.5 -9 672.80 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 07 58 348 6.1 -9 672.80 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 07 59 347 6.0 -9 672.80 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 08 00 346 5.9 -9 672.80 -45.8 -45.8 -45.9 68 0 SPO 1997 04 09 08 01 347 5.9 -9 672.80 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 08 02 346 6.0 -9 672.80 -45.8 -45.8 -45.8 68 -99 SPO 1997 04 09 08 03 346 6.0 -9 672.80 -45.8 -45.8 -45.8 68 -99 SPO 1997 04 09 08 04 345 6.0 -9 672.80 -45.8 -45.7 -45.8 67 -99 SPO 1997 04 09 08 05 346 6.0 -9 672.80 -45.8 -45.7 -45.8 67 -99 SPO 1997 04 09 08 06 345 6.1 -9 672.70 -45.8 -45.7 -45.8 67 -99 SPO 1997 04 09 08 07 345 6.1 -9 672.70 -45.7 -45.7 -45.8 66 -99 SPO 1997 04 09 08 08 344 6.2 -9 672.70 -45.7 -45.7 -45.8 66 -99 SPO 1997 04 09 08 09 345 6.2 -9 672.70 -45.7 -45.7 -45.8 67 -99 SPO 1997 04 09 08 10 345 6.2 -9 672.70 -45.7 -45.7 -45.8 67 -99 SPO 1997 04 09 08 11 344 6.3 -9 672.60 -45.7 -45.7 -45.8 68 -99 SPO 1997 04 09 08 12 345 6.3 -9 672.60 -45.7 -45.7 -45.8 68 -99 SPO 1997 04 09 08 13 345 6.4 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 14 345 6.4 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 15 346 6.4 -9 672.60 -45.7 -45.8 -45.8 68 -99 SPO 1997 04 09 08 16 346 6.6 -9 672.60 -45.7 -45.8 -45.8 68 -99 SPO 1997 04 09 08 17 346 6.7 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 18 346 6.7 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 19 346 6.6 -9 672.60 -45.7 -45.7 -45.8 67 -99 SPO 1997 04 09 08 20 346 6.7 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 21 346 6.7 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 22 347 6.5 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 23 347 6.7 -9 672.60 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 24 347 6.7 -9 672.50 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 25 347 6.7 -9 672.50 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 26 346 6.8 -9 672.50 -45.7 -45.8 -45.8 67 -99 SPO 1997 04 09 08 27 346 6.7 -9 672.50 -45.8 -45.8 -45.8 68 -99 SPO 1997 04 09 08 28 346 6.7 -9 672.50 -45.8 -45.8 -45.8 68 -99 SPO 1997 04 09 08 29 345 6.9 -9 672.50 -45.8 -45.8 -45.8 68 -99 SPO 1997 04 09 08 30 346 7.1 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 31 346 6.9 -9 672.40 -45.8 -45.9 -45.9 67 -99 SPO 1997 04 09 08 32 345 6.9 -9 672.40 -45.8 -45.9 -45.9 66 -99 SPO 1997 04 09 08 33 345 7.0 -9 672.40 -45.8 -45.9 -45.9 66 -99 SPO 1997 04 09 08 34 346 7.1 -9 672.40 -45.8 -45.9 -45.9 67 -99 SPO 1997 04 09 08 35 346 7.2 -9 672.40 -45.8 -45.9 -45.9 67 -99 SPO 1997 04 09 08 36 346 6.8 -9 672.40 -45.8 -45.9 -45.9 68 -99 SPO 1997 04 09 08 37 347 7.1 -9 672.40 -45.8 -45.9 -45.9 68 -99 SPO 1997 04 09 08 38 347 7.4 -9 672.40 -45.8 -45.9 -45.9 68 -99 SPO 1997 04 09 08 39 347 7.3 -9 672.40 -45.8 -45.9 -45.9 67 -99 SPO 1997 04 09 08 40 347 7.2 -9 672.40 -45.9 -45.9 -45.9 68 -99 SPO 1997 04 09 08 41 347 7.0 -9 672.40 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 08 42 347 7.3 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 43 346 6.8 -9 672.40 -45.8 -45.8 -45.9 66 -99 SPO 1997 04 09 08 44 345 6.8 -9 672.40 -45.9 -45.8 -45.9 67 -99 SPO 1997 04 09 08 45 344 6.8 -9 672.40 -45.9 -45.8 -45.9 67 -99 SPO 1997 04 09 08 46 345 6.9 -9 672.40 -45.8 -45.8 -46.0 66 -99 SPO 1997 04 09 08 47 345 7.0 -9 672.40 -45.9 -45.8 -46.0 67 -99 SPO 1997 04 09 08 48 344 6.9 -9 672.40 -45.9 -45.8 -46.0 67 -99 SPO 1997 04 09 08 49 345 7.0 -9 672.40 -45.9 -45.8 -45.9 67 -99 SPO 1997 04 09 08 50 344 7.2 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 51 343 6.9 -9 672.40 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 08 52 343 6.6 -9 672.40 -45.8 -45.8 -45.9 68 -99 SPO 1997 04 09 08 53 343 6.8 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 54 343 6.6 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 55 343 6.6 -9 672.40 -45.8 -45.8 -45.9 66 -99 SPO 1997 04 09 08 56 343 6.5 -9 672.40 -45.8 -45.8 -45.9 66 -99 SPO 1997 04 09 08 57 343 6.5 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 58 343 6.6 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 08 59 343 6.4 -9 672.40 -45.8 -45.8 -45.9 67 -99 SPO 1997 04 09 09 00 343 6.5 -9 672.40 -45.8 -45.8 -45.8 68 0 SPO 1997 04 09 09 01 343 6.7 -9 672.30 -45.8 -45.8 -45.8 68 -99 SPO 1997 04 09 09 02 343 6.5 -9 672.30 -45.8 -45.7 -45.8 68 -99 SPO 1997 04 09 09 03 343 6.5 -9 672.30 -45.7 -45.7 -45.8 67 -99 SPO 1997 04 09 09 04 342 6.8 -9 672.30 -45.7 -45.7 -45.8 67 -99 SPO 1997 04 09 09 05 342 6.8 -9 672.30 -45.7 -45.6 -45.8 67 -99 SPO 1997 04 09 09 06 342 6.8 -9 672.30 -45.7 -45.6 -45.7 68 -99 SPO 1997 04 09 09 07 342 6.7 -9 672.30 -45.6 -45.6 -45.7 68 -99 SPO 1997 04 09 09 08 341 6.8 -9 672.30 -45.6 -45.6 -45.7 67 -99 SPO 1997 04 09 09 09 342 6.9 -9 672.20 -45.6 -45.5 -45.7 66 -99 SPO 1997 04 09 09 10 341 6.8 -9 672.20 -45.6 -45.6 -45.6 66 -99 SPO 1997 04 09 09 11 339 6.7 -9 672.30 -45.5 -45.6 -45.6 66 -99 SPO 1997 04 09 09 12 339 6.7 -9 672.30 -45.5 -45.6 -45.6 67 -99 SPO 1997 04 09 09 13 341 7.0 -9 672.20 -45.5 -45.5 -45.6 68 -99 SPO 1997 04 09 09 14 338 6.9 -9 672.20 -45.5 -45.5 -45.6 68 -99 SPO 1997 04 09 09 15 338 6.9 -9 672.20 -45.5 -45.5 -45.5 68 -99 SPO 1997 04 09 09 16 339 6.9 -9 672.20 -45.4 -45.5 -45.5 67 -99 SPO 1997 04 09 09 17 338 6.9 -9 672.20 -45.4 -45.5 -45.5 68 -99 SPO 1997 04 09 09 18 338 6.8 -9 672.20 -45.4 -45.4 -45.5 68 -99 SPO 1997 04 09 09 19 339 7.0 -9 672.20 -45.4 -45.4 -45.4 68 -99 SPO 1997 04 09 09 20 339 7.0 -9 672.20 -45.4 -45.4 -45.4 68 -99 SPO 1997 04 09 09 21 336 7.1 -9 672.20 -45.3 -45.4 -45.4 67 -99 SPO 1997 04 09 09 22 340 7.0 -9 672.20 -45.3 -45.3 -45.3 67 -99 SPO 1997 04 09 09 23 339 7.1 -9 672.10 -45.3 -45.2 -45.3 67 -99 SPO 1997 04 09 09 24 335 7.0 -9 672.20 -45.2 -45.3 -45.2 66 -99 SPO 1997 04 09 09 25 337 7.1 -9 672.10 -45.2 -45.2 -45.2 67 -99 SPO 1997 04 09 09 26 340 7.2 -9 672.10 -45.2 -45.2 -45.2 68 -99 SPO 1997 04 09 09 27 339 7.4 -9 672.10 -45.1 -45.1 -45.2 67 -99 SPO 1997 04 09 09 28 333 7.0 -9 672.10 -45.1 -45.0 -45.2 68 -99 SPO 1997 04 09 09 29 334 6.9 -9 672.10 -45.1 -45.1 -45.1 68 -99 SPO 1997 04 09 09 30 338 7.2 -9 672.00 -45.0 -44.8 -45.1 68 -99 SPO 1997 04 09 09 31 335 7.0 -9 672.00 -45.0 -45.0 -45.1 68 -99 SPO 1997 04 09 09 32 335 7.3 -9 672.00 -45.0 -45.1 -45.1 68 -99 SPO 1997 04 09 09 33 331 7.3 -9 672.00 -45.0 -45.1 -45.1 68 -99 SPO 1997 04 09 09 34 338 6.9 -9 672.00 -45.0 -45.0 -45.1 68 -99 SPO 1997 04 09 09 35 333 7.0 -9 672.00 -45.0 -45.2 -45.1 68 -99 SPO 1997 04 09 09 36 336 7.4 -9 672.00 -45.0 -45.1 -45.1 67 -99 SPO 1997 04 09 09 37 335 7.1 -9 672.00 -45.0 -45.0 -45.1 67 -99 SPO 1997 04 09 09 38 336 7.6 -9 672.00 -45.0 -45.0 -45.0 67 -99 SPO 1997 04 09 09 39 332 6.7 -9 672.00 -45.0 -45.0 -45.1 67 -99 SPO 1997 04 09 09 40 336 6.6 -9 672.00 -45.0 -45.0 -45.1 68 -99 SPO 1997 04 09 09 41 333 7.0 -9 672.00 -45.0 -44.9 -45.1 68 -99 SPO 1997 04 09 09 42 334 6.5 -9 672.10 -45.0 -44.9 -45.1 68 -99 SPO 1997 04 09 09 43 331 6.4 -9 672.10 -45.0 -45.0 -45.1 68 -99 SPO 1997 04 09 09 44 335 6.6 -9 672.10 -45.0 -45.0 -45.0 68 -99 SPO 1997 04 09 09 45 334 6.4 -9 672.10 -45.0 -44.9 -45.0 68 -99 SPO 1997 04 09 09 46 332 6.3 -9 672.10 -44.9 -44.9 -45.0 67 -99 SPO 1997 04 09 09 47 333 7.0 -9 672.10 -44.9 -44.9 -45.0 67 -99 SPO 1997 04 09 09 48 330 6.7 -9 672.00 -44.9 -44.8 -44.9 67 -99 SPO 1997 04 09 09 49 334 6.6 -9 672.00 -44.8 -44.8 -44.9 67 -99 SPO 1997 04 09 09 50 333 7.1 -9 672.00 -44.8 -44.8 -44.8 67 -99 SPO 1997 04 09 09 51 334 7.0 -9 672.00 -44.7 -44.7 -44.8 67 -99 SPO 1997 04 09 09 52 334 6.9 -9 672.00 -44.7 -44.8 -44.8 67 -99 SPO 1997 04 09 09 53 335 7.0 -9 672.00 -44.7 -44.8 -44.8 68 -99 SPO 1997 04 09 09 54 335 7.0 -9 672.00 -44.7 -44.8 -44.8 68 -99 SPO 1997 04 09 09 55 334 7.1 -9 672.00 -44.7 -44.8 -44.8 68 -99 SPO 1997 04 09 09 56 335 6.8 -9 672.00 -44.7 -44.7 -44.8 68 -99 SPO 1997 04 09 09 57 335 6.7 -9 672.00 -44.7 -44.8 -44.8 68 -99 SPO 1997 04 09 09 58 336 6.8 -9 672.00 -44.6 -44.8 -44.7 67 -99 SPO 1997 04 09 09 59 334 6.8 -9 672.00 -44.7 -44.7 -44.8 67 -99 SPO 1997 04 09 10 00 334 6.7 -9 672.00 -44.7 -44.8 -44.7 67 0 SPO 1997 04 09 10 01 334 6.8 -9 672.00 -44.7 -44.8 -44.7 67 -99 SPO 1997 04 09 10 02 335 6.6 -9 672.00 -44.7 -44.7 -44.7 67 -99 SPO 1997 04 09 10 03 334 6.5 -9 672.00 -44.7 -44.7 -44.7 67 -99 SPO 1997 04 09 10 04 334 6.6 -9 672.00 -44.7 -44.7 -44.7 69 -99 SPO 1997 04 09 10 05 335 6.4 -9 672.00 -44.7 -44.7 -44.7 69 -99 SPO 1997 04 09 10 06 334 6.7 -9 672.00 -44.6 -44.7 -44.7 68 -99 SPO 1997 04 09 10 07 334 6.4 -9 672.00 -44.6 -44.7 -44.7 68 -99 SPO 1997 04 09 10 08 334 6.4 -9 672.00 -44.6 -44.6 -44.7 68 -99 SPO 1997 04 09 10 09 333 6.6 -9 672.00 -44.6 -44.6 -44.7 68 -99 SPO 1997 04 09 10 10 333 6.3 -9 672.00 -44.6 -44.6 -44.7 68 -99 SPO 1997 04 09 10 11 332 6.5 -9 672.00 -44.6 -44.6 -44.7 68 -99 SPO 1997 04 09 10 12 334 6.1 -9 672.00 -44.6 -44.6 -44.6 68 -99 SPO 1997 04 09 10 13 332 6.5 -9 672.00 -44.5 -44.6 -44.6 67 -99 SPO 1997 04 09 10 14 332 6.6 -9 672.00 -44.5 -44.6 -44.6 67 -99 SPO 1997 04 09 10 15 330 7.1 -9 672.00 -44.5 -44.5 -44.5 67 -99 SPO 1997 04 09 10 16 333 6.5 -9 672.00 -44.5 -44.5 -44.6 67 -99 SPO 1997 04 09 10 17 332 6.3 -9 672.00 -44.6 -44.6 -44.7 68 -99 SPO 1997 04 09 10 18 334 6.3 -9 672.00 -44.6 -44.6 -44.7 68 -99 SPO 1997 04 09 10 19 332 6.5 -9 672.00 -44.5 -44.4 -44.7 67 -99 SPO 1997 04 09 10 20 335 6.2 -9 672.00 -44.6 -44.5 -44.7 68 -99 SPO 1997 04 09 10 21 331 6.3 -9 671.90 -44.7 -44.6 -44.8 68 -99 SPO 1997 04 09 10 22 335 6.3 -9 671.90 -44.7 -44.5 -44.8 68 -99 SPO 1997 04 09 10 23 334 6.5 -9 671.90 -44.7 -44.4 -44.8 68 -99 SPO 1997 04 09 10 24 335 6.2 -9 671.90 -44.7 -44.5 -44.7 68 -99 SPO 1997 04 09 10 25 334 6.4 -9 671.90 -44.7 -44.4 -44.8 68 -99 SPO 1997 04 09 10 26 332 6.3 -9 671.90 -44.7 -44.4 -44.8 67 -99 SPO 1997 04 09 10 27 335 6.3 -9 671.90 -44.7 -44.4 -44.8 67 -99 SPO 1997 04 09 10 28 336 6.0 -9 671.90 -44.7 -44.4 -44.8 67 -99 SPO 1997 04 09 10 29 335 5.8 -9 671.90 -44.7 -44.4 -44.8 67 -99 SPO 1997 04 09 10 30 336 6.2 -9 671.90 -44.7 -44.4 -44.8 68 -99 SPO 1997 04 09 10 31 338 6.2 -9 671.90 -44.7 -44.4 -44.8 68 -99 SPO 1997 04 09 10 32 337 6.2 -9 671.90 -44.7 -44.4 -44.8 67 -99 SPO 1997 04 09 10 33 339 6.1 -9 671.90 -44.7 -44.4 -44.8 67 -99 SPO 1997 04 09 10 34 338 6.0 -9 672.00 -44.7 -44.5 -44.8 68 -99 SPO 1997 04 09 10 35 338 5.8 -9 672.00 -44.7 -44.5 -44.8 67 -99 SPO 1997 04 09 10 36 336 5.5 -9 672.00 -44.7 -44.5 -44.8 68 -99 SPO 1997 04 09 10 37 339 5.5 -9 672.00 -44.7 -44.5 -44.8 69 -99 SPO 1997 04 09 10 38 337 5.3 -9 672.00 -44.7 -44.6 -44.8 69 -99 SPO 1997 04 09 10 39 340 5.3 -9 672.00 -44.7 -44.6 -44.8 68 -99 SPO 1997 04 09 10 40 339 5.2 -9 672.00 -44.8 -44.6 -44.9 68 -99 SPO 1997 04 09 10 41 339 5.2 -9 672.00 -44.8 -44.6 -44.9 67 -99 SPO 1997 04 09 10 42 340 5.3 -9 672.00 -44.8 -44.6 -44.9 67 -99 SPO 1997 04 09 10 43 340 5.5 -9 672.00 -44.8 -44.6 -44.9 67 -99 SPO 1997 04 09 10 44 341 5.4 -9 672.00 -44.9 -44.5 -44.9 68 -99 SPO 1997 04 09 10 45 341 5.5 -9 672.00 -44.9 -44.5 -45.0 68 -99 SPO 1997 04 09 10 46 341 5.7 -9 672.00 -44.9 -44.5 -45.0 68 -99 SPO 1997 04 09 10 47 340 5.9 -9 672.00 -44.9 -44.4 -45.0 68 -99 SPO 1997 04 09 10 48 340 6.1 -9 671.90 -44.9 -44.4 -44.9 68 -99 SPO 1997 04 09 10 49 339 6.1 -9 671.90 -44.9 -44.3 -44.9 68 -99 SPO 1997 04 09 10 50 340 6.0 -9 671.90 -44.8 -44.3 -44.9 67 -99 SPO 1997 04 09 10 51 340 6.1 -9 671.90 -44.8 -44.2 -44.8 68 -99 SPO 1997 04 09 10 52 340 6.1 -9 671.90 -44.8 -44.2 -44.8 67 -99 SPO 1997 04 09 10 53 340 6.1 -9 671.90 -44.8 -44.3 -44.8 67 -99 SPO 1997 04 09 10 54 341 6.0 -9 671.90 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 10 55 341 5.9 -9 672.00 -44.8 -44.4 -44.9 67 -99 SPO 1997 04 09 10 56 341 5.5 -9 672.00 -44.8 -44.4 -44.9 68 -99 SPO 1997 04 09 10 57 339 5.4 -9 672.00 -44.8 -44.4 -44.9 68 -99 SPO 1997 04 09 10 58 340 4.9 -9 672.00 -44.8 -44.4 -44.9 68 -99 SPO 1997 04 09 10 59 342 5.1 -9 672.00 -44.8 -44.5 -45.0 68 -99 SPO 1997 04 09 11 00 342 5.0 -9 672.00 -45.0 -44.5 -45.1 70 0 SPO 1997 04 09 11 01 341 5.0 -9 672.00 -45.0 -44.5 -45.1 69 -99 SPO 1997 04 09 11 02 341 5.2 -9 672.00 -45.1 -44.4 -45.2 69 -99 SPO 1997 04 09 11 03 341 5.0 -9 672.00 -45.1 -44.4 -45.2 69 -99 SPO 1997 04 09 11 04 342 4.8 -9 672.00 -45.1 -44.4 -45.2 69 -99 SPO 1997 04 09 11 05 343 4.8 -9 672.00 -45.1 -44.3 -45.2 68 -99 SPO 1997 04 09 11 06 340 5.0 -9 672.00 -45.2 -44.4 -45.2 67 -99 SPO 1997 04 09 11 07 339 5.6 -9 672.00 -45.1 -44.4 -45.2 66 -99 SPO 1997 04 09 11 08 338 6.1 -9 672.00 -45.0 -44.3 -45.1 65 -99 SPO 1997 04 09 11 09 342 6.0 -9 672.00 -45.0 -44.2 -45.0 66 -99 SPO 1997 04 09 11 10 339 5.6 -9 672.00 -45.0 -44.2 -45.2 67 -99 SPO 1997 04 09 11 11 339 5.6 -9 672.00 -45.1 -44.3 -45.2 67 -99 SPO 1997 04 09 11 12 335 5.8 -9 672.00 -45.1 -44.3 -45.1 66 -99 SPO 1997 04 09 11 13 341 6.0 -9 672.00 -45.0 -44.2 -45.0 67 -99 SPO 1997 04 09 11 14 341 6.3 -9 672.00 -45.0 -44.1 -45.0 67 -99 SPO 1997 04 09 11 15 338 5.5 -9 672.00 -45.0 -44.2 -45.0 68 -99 SPO 1997 04 09 11 16 340 5.4 -9 672.00 -45.0 -44.4 -45.1 68 -99 SPO 1997 04 09 11 17 339 5.8 -9 672.00 -45.1 -44.3 -45.2 69 -99 SPO 1997 04 09 11 18 339 5.7 -9 672.00 -45.2 -44.3 -45.3 68 -99 SPO 1997 04 09 11 19 339 5.7 -9 672.00 -45.2 -44.2 -45.3 67 -99 SPO 1997 04 09 11 20 336 5.6 -9 672.00 -45.2 -44.2 -45.3 66 -99 SPO 1997 04 09 11 21 336 5.6 -9 672.00 -45.2 -44.2 -45.2 66 -99 SPO 1997 04 09 11 22 335 5.8 -9 672.00 -45.2 -44.1 -45.2 66 -99 SPO 1997 04 09 11 23 336 5.6 -9 672.00 -45.2 -44.1 -45.2 67 -99 SPO 1997 04 09 11 24 337 5.6 -9 672.00 -45.2 -44.1 -45.3 67 -99 SPO 1997 04 09 11 25 341 5.5 -9 672.00 -45.2 -44.2 -45.2 67 -99 SPO 1997 04 09 11 26 348 5.6 -9 672.00 -45.3 -44.2 -45.4 67 -99 SPO 1997 04 09 11 27 349 5.0 -9 672.00 -45.4 -44.1 -45.6 67 -99 SPO 1997 04 09 11 28 348 4.6 -9 672.00 -45.6 -44.4 -45.8 68 -99 SPO 1997 04 09 11 29 350 4.7 -9 672.00 -45.8 -44.5 -46.0 68 -99 SPO 1997 04 09 11 30 351 5.1 -9 672.00 -45.9 -44.4 -46.1 69 -99 SPO 1997 04 09 11 31 350 5.3 -9 672.00 -45.9 -44.3 -46.1 67 -99 SPO 1997 04 09 11 32 349 5.2 -9 672.00 -46.0 -44.3 -46.1 66 -99 SPO 1997 04 09 11 33 348 5.5 -9 672.00 -46.0 -44.3 -46.1 66 -99 SPO 1997 04 09 11 34 348 5.9 -9 672.00 -46.0 -44.4 -46.1 66 -99 SPO 1997 04 09 11 35 348 5.9 -9 672.00 -46.0 -44.4 -46.0 66 -99 SPO 1997 04 09 11 36 348 5.9 -9 672.00 -46.0 -44.4 -46.0 66 -99 SPO 1997 04 09 11 37 349 5.7 -9 672.00 -45.9 -44.4 -45.9 66 -99 SPO 1997 04 09 11 38 349 5.6 -9 672.00 -45.9 -44.4 -46.0 67 -99 SPO 1997 04 09 11 39 350 5.6 -9 672.00 -45.9 -44.4 -45.9 67 -99 SPO 1997 04 09 11 40 349 5.7 -9 672.00 -45.9 -44.4 -45.9 67 -99 SPO 1997 04 09 11 41 348 6.0 -9 672.00 -45.9 -44.4 -45.8 67 -99 SPO 1997 04 09 11 42 346 6.1 -9 672.00 -45.8 -44.3 -45.8 68 -99 SPO 1997 04 09 11 43 345 6.2 -9 672.00 -45.8 -44.3 -45.7 68 -99 SPO 1997 04 09 11 44 345 6.5 -9 672.00 -45.7 -44.3 -45.7 67 -99 SPO 1997 04 09 11 45 345 6.6 -9 671.90 -45.6 -44.2 -45.6 67 -99 SPO 1997 04 09 11 46 343 6.7 -9 671.90 -45.6 -44.3 -45.6 67 -99 SPO 1997 04 09 11 47 343 6.9 -9 671.90 -45.6 -44.2 -45.6 67 -99 SPO 1997 04 09 11 48 344 6.8 -9 671.90 -45.5 -44.2 -45.5 66 -99 SPO 1997 04 09 11 49 345 6.7 -9 671.90 -45.5 -44.2 -45.5 67 -99 SPO 1997 04 09 11 50 345 6.8 -9 671.90 -45.5 -44.3 -45.5 67 -99 SPO 1997 04 09 11 51 344 6.7 -9 671.90 -45.4 -44.3 -45.5 67 -99 SPO 1997 04 09 11 52 344 6.7 -9 671.90 -45.4 -44.3 -45.4 67 -99 SPO 1997 04 09 11 53 344 6.7 -9 671.90 -45.4 -44.3 -45.4 67 -99 SPO 1997 04 09 11 54 343 6.5 -9 671.90 -45.4 -44.3 -45.4 67 -99 SPO 1997 04 09 11 55 342 6.7 -9 671.90 -45.3 -44.4 -45.4 67 -99 SPO 1997 04 09 11 56 342 6.7 -9 671.90 -45.3 -44.4 -45.4 68 -99 SPO 1997 04 09 11 57 342 6.8 -9 671.90 -45.3 -44.4 -45.4 68 -99 SPO 1997 04 09 11 58 341 6.7 -9 671.90 -45.3 -44.4 -45.4 67 -99 SPO 1997 04 09 11 59 343 6.7 -9 671.90 -45.4 -44.4 -45.4 67 -99 SPO 1997 04 09 12 00 344 6.5 -9 671.90 -45.4 -44.4 -45.5 67 0 SPO 1997 04 09 12 01 344 6.6 -9 671.90 -45.4 -44.4 -45.5 66 -99 SPO 1997 04 09 12 02 345 6.6 -9 671.90 -45.5 -44.4 -45.5 68 -99 SPO 1997 04 09 12 03 346 6.7 -9 671.90 -45.5 -44.4 -45.6 68 -99 SPO 1997 04 09 12 04 347 6.7 -9 671.80 -45.5 -44.4 -45.6 68 -99 SPO 1997 04 09 12 05 347 6.9 -9 671.80 -45.5 -44.4 -45.6 68 -99 SPO 1997 04 09 12 06 348 6.9 -9 671.80 -45.5 -44.4 -45.6 68 -99 SPO 1997 04 09 12 07 347 7.0 -9 671.80 -45.5 -44.4 -45.5 67 -99 SPO 1997 04 09 12 08 347 7.1 -9 671.80 -45.5 -44.4 -45.5 67 -99 SPO 1997 04 09 12 09 347 7.1 -9 671.80 -45.5 -44.4 -45.5 67 -99 SPO 1997 04 09 12 10 347 7.1 -9 671.80 -45.5 -44.4 -45.5 68 -99 SPO 1997 04 09 12 11 347 6.9 -9 671.80 -45.4 -44.4 -45.5 66 -99 SPO 1997 04 09 12 12 347 6.9 -9 671.80 -45.4 -44.4 -45.5 66 -99 SPO 1997 04 09 12 13 348 6.8 -9 671.80 -45.4 -44.4 -45.5 65 -99 SPO 1997 04 09 12 14 347 6.8 -9 671.80 -45.4 -44.4 -45.5 65 -99 SPO 1997 04 09 12 15 347 6.7 -9 671.80 -45.4 -44.5 -45.5 66 -99 SPO 1997 04 09 12 16 346 6.7 -9 671.80 -45.4 -44.5 -45.5 66 -99 SPO 1997 04 09 12 17 346 6.6 -9 671.80 -45.4 -44.5 -45.5 67 -99 SPO 1997 04 09 12 18 346 6.5 -9 671.80 -45.4 -44.5 -45.5 67 -99 SPO 1997 04 09 12 19 346 6.4 -9 671.80 -45.4 -44.6 -45.5 67 -99 SPO 1997 04 09 12 20 346 6.4 -9 671.80 -45.4 -44.6 -45.5 67 -99 SPO 1997 04 09 12 21 346 6.3 -9 671.80 -45.4 -44.6 -45.5 68 -99 SPO 1997 04 09 12 22 347 6.3 -9 671.80 -45.4 -44.5 -45.5 68 -99 SPO 1997 04 09 12 23 347 6.4 -9 671.80 -45.4 -44.5 -45.5 67 -99 SPO 1997 04 09 12 24 347 6.4 -9 671.80 -45.4 -44.5 -45.5 66 -99 SPO 1997 04 09 12 25 346 6.5 -9 671.80 -45.4 -44.5 -45.4 66 -99 SPO 1997 04 09 12 26 346 6.4 -9 671.80 -45.4 -44.5 -45.5 66 -99 SPO 1997 04 09 12 27 346 6.5 -9 671.80 -45.4 -44.5 -45.5 66 -99 SPO 1997 04 09 12 28 345 6.5 -9 671.80 -45.4 -44.5 -45.4 66 -99 SPO 1997 04 09 12 29 344 6.5 -9 671.80 -45.4 -44.5 -45.5 67 -99 SPO 1997 04 09 12 30 343 6.5 -9 671.80 -45.4 -44.5 -45.4 67 -99 SPO 1997 04 09 12 31 343 6.5 -9 671.70 -45.4 -44.5 -45.4 68 -99 SPO 1997 04 09 12 32 341 6.5 -9 671.70 -45.3 -44.5 -45.4 67 -99 SPO 1997 04 09 12 33 342 6.5 -9 671.70 -45.3 -44.4 -45.4 67 -99 SPO 1997 04 09 12 34 341 6.6 -9 671.70 -45.3 -44.4 -45.3 67 -99 SPO 1997 04 09 12 35 340 6.7 -9 671.70 -45.3 -44.5 -45.3 67 -99 SPO 1997 04 09 12 36 339 6.7 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 37 339 6.8 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 38 338 6.8 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 39 338 6.7 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 40 338 6.7 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 41 337 6.5 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 42 337 6.3 -9 671.70 -45.2 -44.5 -45.3 67 -99 SPO 1997 04 09 12 43 337 6.3 -9 671.70 -45.3 -44.5 -45.4 68 -99 SPO 1997 04 09 12 44 337 6.2 -9 671.70 -45.3 -44.5 -45.4 67 -99 SPO 1997 04 09 12 45 338 6.3 -9 671.70 -45.3 -44.5 -45.4 67 -99 SPO 1997 04 09 12 46 339 6.3 -9 671.70 -45.3 -44.5 -45.4 67 -99 SPO 1997 04 09 12 47 340 6.3 -9 671.60 -45.4 -44.5 -45.4 68 -99 SPO 1997 04 09 12 48 341 6.4 -9 671.60 -45.4 -44.5 -45.4 68 -99 SPO 1997 04 09 12 49 341 6.2 -9 671.60 -45.4 -44.5 -45.4 69 -99 SPO 1997 04 09 12 50 340 6.3 -9 671.70 -45.4 -44.5 -45.5 68 -99 SPO 1997 04 09 12 51 339 6.4 -9 671.70 -45.4 -44.5 -45.5 68 -99 SPO 1997 04 09 12 52 339 6.4 -9 671.70 -45.4 -44.4 -45.5 67 -99 SPO 1997 04 09 12 53 338 6.2 -9 671.70 -45.5 -44.3 -45.6 67 -99 SPO 1997 04 09 12 54 338 6.1 -9 671.70 -45.5 -44.3 -45.5 66 -99 SPO 1997 04 09 12 55 337 6.2 -9 671.70 -45.5 -44.4 -45.5 67 -99 SPO 1997 04 09 12 56 338 5.9 -9 671.70 -45.5 -44.4 -45.6 68 -99 SPO 1997 04 09 12 57 339 5.7 -9 671.70 -45.5 -44.5 -45.6 68 -99 SPO 1997 04 09 12 58 341 5.8 -9 671.70 -45.5 -44.6 -45.7 68 -99 SPO 1997 04 09 12 59 342 5.8 -9 671.70 -45.6 -44.6 -45.8 68 -99 SPO 1997 04 09 13 00 342 5.8 -9 671.60 -45.7 -44.6 -45.8 69 0 SPO 1997 04 09 13 01 343 6.0 -9 671.60 -45.7 -44.6 -45.9 67 -99 SPO 1997 04 09 13 02 343 6.0 -9 671.60 -45.8 -44.6 -45.9 68 -99 SPO 1997 04 09 13 03 344 6.0 -9 671.60 -45.8 -44.5 -45.9 66 -99 SPO 1997 04 09 13 04 344 6.0 -9 671.60 -45.9 -44.6 -45.9 66 -99 SPO 1997 04 09 13 05 343 6.2 -9 671.60 -45.9 -44.5 -45.9 66 -99 SPO 1997 04 09 13 06 343 6.2 -9 671.60 -45.9 -44.4 -45.9 66 -99 SPO 1997 04 09 13 07 343 6.3 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 08 342 6.4 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 09 342 6.2 -9 671.60 -45.9 -44.3 -45.9 68 -99 SPO 1997 04 09 13 10 342 6.1 -9 671.60 -45.8 -44.3 -45.9 68 -99 SPO 1997 04 09 13 11 342 6.2 -9 671.60 -45.8 -44.3 -45.9 68 -99 SPO 1997 04 09 13 12 342 6.2 -9 671.60 -45.9 -44.2 -45.9 69 -99 SPO 1997 04 09 13 13 340 6.3 -9 671.60 -45.9 -44.2 -45.9 68 -99 SPO 1997 04 09 13 14 340 6.4 -9 671.60 -45.8 -44.2 -45.8 66 -99 SPO 1997 04 09 13 15 340 6.4 -9 671.60 -45.8 -44.2 -45.8 67 -99 SPO 1997 04 09 13 16 341 6.3 -9 671.60 -45.8 -44.2 -45.8 67 -99 SPO 1997 04 09 13 17 342 6.3 -9 671.60 -45.8 -44.3 -45.8 67 -99 SPO 1997 04 09 13 18 341 6.3 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 19 342 6.1 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 20 343 6.0 -9 671.60 -45.8 -44.3 -45.9 67 -99 SPO 1997 04 09 13 21 343 6.0 -9 671.60 -45.8 -44.4 -45.9 67 -99 SPO 1997 04 09 13 22 343 6.1 -9 671.60 -45.9 -44.4 -45.9 68 -99 SPO 1997 04 09 13 23 343 6.2 -9 671.60 -45.9 -44.3 -45.9 69 -99 SPO 1997 04 09 13 24 342 6.4 -9 671.60 -45.9 -44.3 -45.9 68 -99 SPO 1997 04 09 13 25 342 6.3 -9 671.60 -45.8 -44.3 -45.8 67 -99 SPO 1997 04 09 13 26 343 6.2 -9 671.60 -45.8 -44.3 -45.8 66 -99 SPO 1997 04 09 13 27 343 6.2 -9 671.60 -45.8 -44.3 -45.8 67 -99 SPO 1997 04 09 13 28 345 6.2 -9 671.60 -45.8 -44.3 -45.8 67 -99 SPO 1997 04 09 13 29 344 6.2 -9 671.50 -45.8 -44.2 -45.8 67 -99 SPO 1997 04 09 13 30 344 5.9 -9 671.60 -45.8 -44.2 -45.8 67 -99 SPO 1997 04 09 13 31 343 5.4 -9 671.60 -45.8 -44.2 -45.8 67 -99 SPO 1997 04 09 13 32 347 5.5 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 33 351 5.8 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 34 348 5.7 -9 671.60 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 13 35 347 5.7 -9 671.60 -45.8 -44.3 -45.9 67 -99 SPO 1997 04 09 13 36 347 6.0 -9 671.60 -45.8 -44.4 -45.9 67 -99 SPO 1997 04 09 13 37 346 6.1 -9 671.60 -45.8 -44.4 -45.8 67 -99 SPO 1997 04 09 13 38 346 5.9 -9 671.60 -45.8 -44.4 -45.8 68 -99 SPO 1997 04 09 13 39 345 5.7 -9 671.60 -45.7 -44.4 -45.7 67 -99 SPO 1997 04 09 13 40 347 5.8 -9 671.60 -45.7 -44.4 -45.8 68 -99 SPO 1997 04 09 13 41 351 6.1 -9 671.60 -45.7 -44.4 -45.8 68 -99 SPO 1997 04 09 13 42 349 5.9 -9 671.60 -45.7 -44.4 -45.7 68 -99 SPO 1997 04 09 13 43 348 6.0 -9 671.60 -45.7 -44.4 -45.8 67 -99 SPO 1997 04 09 13 44 350 6.0 -9 671.60 -45.7 -44.4 -45.7 66 -99 SPO 1997 04 09 13 45 350 5.9 -9 671.60 -45.7 -44.4 -45.7 66 -99 SPO 1997 04 09 13 46 351 6.0 -9 671.60 -45.7 -44.4 -45.7 67 -99 SPO 1997 04 09 13 47 352 5.9 -9 671.50 -45.7 -44.4 -45.7 68 -99 SPO 1997 04 09 13 48 353 6.0 -9 671.50 -45.6 -44.4 -45.7 67 -99 SPO 1997 04 09 13 49 355 5.9 -9 671.50 -45.6 -44.4 -45.7 67 -99 SPO 1997 04 09 13 50 357 6.0 -9 671.50 -45.6 -44.4 -45.7 67 -99 SPO 1997 04 09 13 51 357 5.9 -9 671.50 -45.7 -44.4 -45.8 68 -99 SPO 1997 04 09 13 52 356 6.2 -9 671.50 -45.7 -44.4 -45.8 68 -99 SPO 1997 04 09 13 53 355 6.2 -9 671.50 -45.7 -44.4 -45.7 68 -99 SPO 1997 04 09 13 54 355 6.2 -9 671.50 -45.7 -44.3 -45.7 68 -99 SPO 1997 04 09 13 55 356 6.1 -9 671.50 -45.6 -44.3 -45.7 67 -99 SPO 1997 04 09 13 56 357 6.1 -9 671.50 -45.6 -44.4 -45.7 66 -99 SPO 1997 04 09 13 57 358 6.1 -9 671.50 -45.7 -44.5 -45.8 67 -99 SPO 1997 04 09 13 58 357 6.1 -9 671.50 -45.7 -44.5 -45.8 67 -99 SPO 1997 04 09 13 59 357 6.2 -9 671.50 -45.8 -44.5 -45.9 67 -99 SPO 1997 04 09 14 00 357 6.2 -9 671.50 -45.8 -44.5 -45.9 68 0 SPO 1997 04 09 14 01 357 6.4 -9 671.40 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 02 355 6.4 -9 671.40 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 03 354 6.5 -9 671.40 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 04 353 6.5 -9 671.40 -45.8 -44.4 -45.8 68 -99 SPO 1997 04 09 14 05 352 6.7 -9 671.40 -45.8 -44.4 -45.8 68 -99 SPO 1997 04 09 14 06 352 6.9 -9 671.40 -45.8 -44.4 -45.8 69 -99 SPO 1997 04 09 14 07 352 6.9 -9 671.40 -45.8 -44.3 -45.8 69 -99 SPO 1997 04 09 14 08 353 6.8 -9 671.40 -45.7 -44.3 -45.8 68 -99 SPO 1997 04 09 14 09 355 6.9 -9 671.40 -45.7 -44.3 -45.8 67 -99 SPO 1997 04 09 14 10 356 6.8 -9 671.40 -45.8 -44.3 -45.8 67 -99 SPO 1997 04 09 14 11 356 6.7 -9 671.40 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 14 12 358 6.7 -9 671.40 -45.8 -44.4 -45.9 66 -99 SPO 1997 04 09 14 13 358 6.8 -9 671.40 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 14 14 358 6.8 -9 671.40 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 14 15 357 6.6 -9 671.40 -45.8 -44.3 -45.9 66 -99 SPO 1997 04 09 14 16 357 6.7 -9 671.40 -45.8 -44.4 -45.9 66 -99 SPO 1997 04 09 14 17 356 6.8 -9 671.40 -45.8 -44.4 -45.8 67 -99 SPO 1997 04 09 14 18 357 6.8 -9 671.40 -45.8 -44.4 -45.8 68 -99 SPO 1997 04 09 14 19 359 7.2 -9 671.40 -45.8 -44.3 -45.8 68 -99 SPO 1997 04 09 14 20 357 6.8 -9 671.40 -45.7 -44.3 -45.8 68 -99 SPO 1997 04 09 14 21 357 6.7 -9 671.40 -45.7 -44.4 -45.8 68 -99 SPO 1997 04 09 14 22 358 6.8 -9 671.40 -45.7 -44.5 -45.8 67 -99 SPO 1997 04 09 14 23 358 6.7 -9 671.40 -45.8 -44.4 -45.8 67 -99 SPO 1997 04 09 14 24 358 6.6 -9 671.40 -45.8 -44.4 -45.8 66 -99 SPO 1997 04 09 14 25 358 6.8 -9 671.40 -45.8 -44.4 -45.8 66 -99 SPO 1997 04 09 14 26 359 7.1 -9 671.40 -45.8 -44.4 -45.8 66 -99 SPO 1997 04 09 14 27 360 7.2 -9 671.40 -45.8 -44.4 -45.8 66 -99 SPO 1997 04 09 14 28 359 7.0 -9 671.40 -45.7 -44.5 -45.8 66 -99 SPO 1997 04 09 14 29 0 7.0 -9 671.40 -45.8 -44.5 -45.8 67 -99 SPO 1997 04 09 14 30 360 6.8 -9 671.40 -45.8 -44.5 -45.8 68 -99 SPO 1997 04 09 14 31 359 6.8 -9 671.40 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 32 359 6.9 -9 671.40 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 33 359 7.2 -9 671.30 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 34 358 7.1 -9 671.30 -45.8 -44.5 -45.9 68 -99 SPO 1997 04 09 14 35 357 7.0 -9 671.30 -45.8 -44.6 -45.9 66 -99 SPO 1997 04 09 14 36 357 7.0 -9 671.30 -45.8 -44.6 -46.0 66 -99 SPO 1997 04 09 14 37 357 7.1 -9 671.30 -45.9 -44.7 -46.0 66 -99 SPO 1997 04 09 14 38 357 7.2 -9 671.30 -45.9 -44.7 -46.0 66 -99 SPO 1997 04 09 14 39 356 7.2 -9 671.30 -45.9 -44.7 -46.0 66 -99 SPO 1997 04 09 14 40 358 7.6 -9 671.30 -46.0 -44.6 -46.0 68 -99 SPO 1997 04 09 14 41 357 7.6 -9 671.30 -45.9 -44.6 -46.0 67 -99 SPO 1997 04 09 14 42 356 7.4 -9 671.30 -45.9 -44.6 -46.0 68 -99 SPO 1997 04 09 14 43 356 7.6 -9 671.30 -46.0 -44.6 -46.0 69 -99 SPO 1997 04 09 14 44 356 7.5 -9 671.30 -45.9 -44.6 -46.0 68 -99 SPO 1997 04 09 14 45 356 7.6 -9 671.30 -45.9 -44.6 -46.0 67 -99 SPO 1997 04 09 14 46 356 7.2 -9 671.30 -45.9 -44.6 -46.0 67 -99 SPO 1997 04 09 14 47 357 7.1 -9 671.30 -45.9 -44.7 -46.0 67 -99 SPO 1997 04 09 14 48 357 7.1 -9 671.30 -45.9 -44.7 -46.0 66 -99 SPO 1997 04 09 14 49 357 7.2 -9 671.30 -45.9 -44.6 -46.0 66 -99 SPO 1997 04 09 14 50 357 7.0 -9 671.30 -45.9 -44.6 -46.0 66 -99 SPO 1997 04 09 14 51 357 7.1 -9 671.30 -45.9 -44.6 -46.0 66 -99 SPO 1997 04 09 14 52 357 7.0 -9 671.30 -45.9 -44.5 -46.0 66 -99 SPO 1997 04 09 14 53 357 7.2 -9 671.30 -45.9 -44.5 -46.0 67 -99 SPO 1997 04 09 14 54 356 7.3 -9 671.20 -45.9 -44.5 -46.0 66 -99 SPO 1997 04 09 14 55 354 7.1 -9 671.20 -45.9 -44.5 -46.0 67 -99 SPO 1997 04 09 14 56 354 7.1 -9 671.30 -45.9 -44.6 -45.9 67 -99 SPO 1997 04 09 14 57 354 7.1 -9 671.20 -45.9 -44.7 -45.9 68 -99 SPO 1997 04 09 14 58 354 7.0 -9 671.30 -45.9 -44.7 -46.0 68 -99 SPO 1997 04 09 14 59 354 6.9 -9 671.20 -45.9 -44.8 -46.0 68 -99 SPO 1997 04 09 15 00 355 6.9 -9 671.20 -45.9 -44.8 -46.0 68 0 SPO 1997 04 09 15 01 354 6.9 -9 671.30 -45.9 -44.8 -46.0 67 -99 SPO 1997 04 09 15 02 355 6.9 -9 671.30 -45.9 -44.9 -46.1 67 -99 SPO 1997 04 09 15 03 355 6.9 -9 671.20 -46.0 -44.8 -46.1 67 -99 SPO 1997 04 09 15 04 355 7.0 -9 671.20 -46.0 -44.9 -46.1 67 -99 SPO 1997 04 09 15 05 355 6.8 -9 671.20 -46.0 -44.9 -46.1 68 -99 SPO 1997 04 09 15 06 354 6.9 -9 671.20 -46.0 -44.9 -46.1 67 -99 SPO 1997 04 09 15 07 354 6.7 -9 671.20 -46.0 -44.9 -46.1 67 -99 SPO 1997 04 09 15 08 354 6.9 -9 671.20 -46.1 -44.8 -46.2 67 -99 SPO 1997 04 09 15 09 354 6.7 -9 671.20 -46.1 -44.7 -46.2 67 -99 SPO 1997 04 09 15 10 354 6.9 -9 671.20 -46.1 -44.6 -46.2 67 -99 SPO 1997 04 09 15 11 354 7.1 -9 671.20 -46.1 -44.6 -46.2 68 -99 SPO 1997 04 09 15 12 355 7.0 -9 671.20 -46.1 -44.6 -46.2 67 -99 SPO 1997 04 09 15 13 355 6.9 -9 671.20 -46.2 -44.6 -46.2 68 -99 SPO 1997 04 09 15 14 355 6.8 -9 671.20 -46.2 -44.7 -46.3 66 -99 SPO 1997 04 09 15 15 355 6.8 -9 671.20 -46.2 -44.7 -46.3 65 -99 SPO 1997 04 09 15 16 354 6.8 -9 671.20 -46.2 -44.7 -46.4 65 -99 SPO 1997 04 09 15 17 353 6.8 -9 671.20 -46.3 -44.8 -46.4 65 -99 SPO 1997 04 09 15 18 353 6.8 -9 671.20 -46.3 -44.8 -46.4 67 -99 SPO 1997 04 09 15 19 353 6.9 -9 671.20 -46.3 -44.8 -46.4 67 -99 SPO 1997 04 09 15 20 353 6.8 -9 671.20 -46.3 -44.8 -46.4 67 -99 SPO 1997 04 09 15 21 353 6.6 -9 671.20 -46.4 -44.8 -46.4 68 -99 SPO 1997 04 09 15 22 354 6.4 -9 671.20 -46.4 -44.9 -46.4 68 -99 SPO 1997 04 09 15 23 354 6.4 -9 671.20 -46.4 -44.9 -46.5 68 -99 SPO 1997 04 09 15 24 354 6.3 -9 671.20 -46.4 -45.0 -46.5 68 -99 SPO 1997 04 09 15 25 355 6.5 -9 671.20 -46.4 -45.0 -46.5 68 -99 SPO 1997 04 09 15 26 356 6.5 -9 671.10 -46.4 -45.0 -46.5 66 -99 SPO 1997 04 09 15 27 356 6.4 -9 671.10 -46.4 -45.0 -46.5 65 -99 SPO 1997 04 09 15 28 356 6.5 -9 671.10 -46.5 -45.0 -46.6 65 -99 SPO 1997 04 09 15 29 356 6.4 -9 671.10 -46.5 -45.1 -46.6 64 -99 SPO 1997 04 09 15 30 354 6.3 -9 671.10 -46.5 -45.1 -46.6 65 -99 SPO 1997 04 09 15 31 354 6.4 -9 671.10 -46.6 -45.1 -46.6 65 -99 SPO 1997 04 09 15 32 354 6.6 -9 671.10 -46.6 -45.1 -46.7 65 -99 SPO 1997 04 09 15 33 354 6.6 -9 671.10 -46.6 -45.0 -46.7 65 -99 SPO 1997 04 09 15 34 356 7.0 -9 671.10 -46.6 -45.0 -46.6 65 -99 SPO 1997 04 09 15 35 353 6.7 -9 671.10 -46.6 -45.0 -46.6 65 -99 SPO 1997 04 09 15 36 354 6.8 -9 671.10 -46.6 -45.2 -46.6 65 -99 SPO 1997 04 09 15 37 355 7.2 -9 671.10 -46.5 -45.2 -46.6 65 -99 SPO 1997 04 09 15 38 355 7.1 -9 671.10 -46.5 -45.1 -46.6 66 -99 SPO 1997 04 09 15 39 354 6.9 -9 671.10 -46.5 -45.2 -46.6 65 -99 SPO 1997 04 09 15 40 354 6.5 -9 671.10 -46.6 -45.3 -46.6 65 -99 SPO 1997 04 09 15 41 352 6.3 -9 671.10 -46.6 -45.3 -46.7 65 -99 SPO 1997 04 09 15 42 352 6.3 -9 671.10 -46.6 -45.4 -46.7 65 -99 SPO 1997 04 09 15 43 353 6.3 -9 671.10 -46.6 -45.5 -46.7 65 -99 SPO 1997 04 09 15 44 353 6.0 -9 671.10 -46.7 -45.5 -46.7 66 -99 SPO 1997 04 09 15 45 352 6.0 -9 671.10 -46.7 -45.5 -46.8 65 -99 SPO 1997 04 09 15 46 353 6.3 -9 671.10 -46.7 -45.5 -46.7 65 -99 SPO 1997 04 09 15 47 354 6.4 -9 671.10 -46.7 -45.5 -46.8 66 -99 SPO 1997 04 09 15 48 356 6.2 -9 671.10 -46.7 -45.5 -46.8 66 -99 SPO 1997 04 09 15 49 357 6.2 -9 671.10 -46.7 -45.6 -46.8 66 -99 SPO 1997 04 09 15 50 357 6.2 -9 671.10 -46.8 -45.6 -46.8 66 -99 SPO 1997 04 09 15 51 357 6.2 -9 671.10 -46.8 -45.7 -46.9 66 -99 SPO 1997 04 09 15 52 357 6.3 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 53 357 6.5 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 54 356 6.3 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 55 358 6.5 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 56 358 6.8 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 57 358 6.9 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 58 357 7.0 -9 671.10 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 15 59 356 6.9 -9 671.10 -46.8 -45.7 -46.9 66 -99 SPO 1997 04 09 16 00 355 6.7 -9 671.10 -46.8 -45.7 -46.9 66 0 SPO 1997 04 09 16 01 354 6.4 -9 671.10 -46.8 -45.8 -46.9 66 -99 SPO 1997 04 09 16 02 355 6.4 -9 671.10 -46.9 -45.9 -47.0 67 -99 SPO 1997 04 09 16 03 355 6.4 -9 671.10 -46.9 -45.9 -47.0 67 -99 SPO 1997 04 09 16 04 357 6.9 -9 671.10 -46.9 -45.9 -47.0 66 -99 SPO 1997 04 09 16 05 359 7.1 -9 671.00 -46.9 -45.8 -47.0 65 -99 SPO 1997 04 09 16 06 359 7.2 -9 671.00 -46.9 -45.7 -47.0 65 -99 SPO 1997 04 09 16 07 358 7.1 -9 671.00 -46.9 -45.7 -47.0 65 -99 SPO 1997 04 09 16 08 357 7.0 -9 671.00 -46.9 -45.7 -47.0 65 -99 SPO 1997 04 09 16 09 355 7.1 -9 671.00 -46.9 -45.7 -47.0 65 -99 SPO 1997 04 09 16 10 355 7.0 -9 671.00 -46.9 -45.6 -47.0 66 -99 SPO 1997 04 09 16 11 355 6.8 -9 671.00 -46.9 -45.7 -47.0 66 -99 SPO 1997 04 09 16 12 355 7.0 -9 671.00 -46.9 -45.7 -46.9 66 -99 SPO 1997 04 09 16 13 355 6.9 -9 671.00 -46.9 -45.7 -46.9 66 -99 SPO 1997 04 09 16 14 355 7.1 -9 671.00 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 16 15 355 7.1 -9 670.90 -46.8 -45.7 -46.8 65 -99 SPO 1997 04 09 16 16 355 7.3 -9 670.90 -46.8 -45.7 -46.9 65 -99 SPO 1997 04 09 16 17 355 7.4 -9 670.90 -46.8 -45.6 -46.9 65 -99 SPO 1997 04 09 16 18 355 7.5 -9 670.90 -46.8 -45.6 -46.9 65 -99 SPO 1997 04 09 16 19 355 7.5 -9 670.90 -46.8 -45.5 -46.9 65 -99 SPO 1997 04 09 16 20 356 7.2 -9 670.90 -46.9 -45.5 -47.0 65 -99 SPO 1997 04 09 16 21 357 7.2 -9 670.90 -46.9 -45.6 -47.0 65 -99 SPO 1997 04 09 16 22 358 7.0 -9 670.90 -46.9 -45.6 -47.0 65 -99 SPO 1997 04 09 16 23 358 6.8 -9 670.90 -47.0 -45.7 -47.1 66 -99 SPO 1997 04 09 16 24 359 6.9 -9 670.90 -47.0 -45.8 -47.1 66 -99 SPO 1997 04 09 16 25 359 6.8 -9 670.90 -47.1 -45.8 -47.2 66 -99 SPO 1997 04 09 16 26 359 6.7 -9 670.90 -47.1 -45.8 -47.2 66 -99 SPO 1997 04 09 16 27 359 6.8 -9 670.90 -47.1 -45.8 -47.3 66 -99 SPO 1997 04 09 16 28 358 6.6 -9 670.90 -47.2 -45.8 -47.3 66 -99 SPO 1997 04 09 16 29 358 6.6 -9 670.90 -47.2 -45.8 -47.3 66 -99 SPO 1997 04 09 16 30 359 6.7 -9 670.90 -47.2 -45.8 -47.2 65 -99 SPO 1997 04 09 16 31 0 6.6 -9 670.90 -47.2 -45.8 -47.2 65 -99 SPO 1997 04 09 16 32 0 6.8 -9 670.90 -47.2 -45.8 -47.2 65 -99 SPO 1997 04 09 16 33 1 6.7 -9 670.90 -47.2 -45.8 -47.3 65 -99 SPO 1997 04 09 16 34 360 6.8 -9 670.90 -47.2 -45.8 -47.3 65 -99 SPO 1997 04 09 16 35 358 6.9 -9 670.80 -47.2 -45.8 -47.2 65 -99 SPO 1997 04 09 16 36 358 7.0 -9 670.80 -47.1 -45.8 -47.2 65 -99 SPO 1997 04 09 16 37 358 7.1 -9 670.80 -47.1 -45.8 -47.1 66 -99 SPO 1997 04 09 16 38 358 7.0 -9 670.80 -47.1 -45.9 -47.1 66 -99 SPO 1997 04 09 16 39 358 6.9 -9 670.80 -47.1 -46.0 -47.1 66 -99 SPO 1997 04 09 16 40 358 6.9 -9 670.80 -47.1 -46.0 -47.1 66 -99 SPO 1997 04 09 16 41 359 7.0 -9 670.80 -47.1 -46.0 -47.1 66 -99 SPO 1997 04 09 16 42 358 6.9 -9 670.80 -47.1 -46.1 -47.1 66 -99 SPO 1997 04 09 16 43 358 7.0 -9 670.80 -47.1 -46.1 -47.1 66 -99 SPO 1997 04 09 16 44 358 7.4 -9 670.80 -47.0 -46.1 -47.0 65 -99 SPO 1997 04 09 16 45 358 7.3 -9 670.80 -47.0 -46.0 -47.0 65 -99 SPO 1997 04 09 16 46 359 7.3 -9 670.80 -46.9 -46.0 -46.9 65 -99 SPO 1997 04 09 16 47 359 7.3 -9 670.80 -46.8 -46.0 -46.9 65 -99 SPO 1997 04 09 16 48 358 7.3 -9 670.80 -46.8 -46.0 -46.9 66 -99 SPO 1997 04 09 16 49 357 7.4 -9 670.80 -46.8 -45.9 -46.8 66 -99 SPO 1997 04 09 16 50 356 7.2 -9 670.80 -46.8 -46.0 -46.8 66 -99 SPO 1997 04 09 16 51 355 7.1 -9 670.80 -46.8 -45.9 -46.8 66 -99 SPO 1997 04 09 16 52 355 7.3 -9 670.80 -46.7 -45.9 -46.8 66 -99 SPO 1997 04 09 16 53 355 7.1 -9 670.80 -46.7 -45.9 -46.7 65 -99 SPO 1997 04 09 16 54 355 7.2 -9 670.80 -46.7 -45.9 -46.7 65 -99 SPO 1997 04 09 16 55 355 6.9 -9 670.80 -46.6 -46.0 -46.6 65 -99 SPO 1997 04 09 16 56 356 7.0 -9 670.80 -46.6 -46.1 -46.6 65 -99 SPO 1997 04 09 16 57 355 6.9 -9 670.80 -46.5 -46.1 -46.6 65 -99 SPO 1997 04 09 16 58 356 6.6 -9 670.80 -46.5 -46.2 -46.6 65 -99 SPO 1997 04 09 16 59 356 6.6 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 00 356 6.7 -9 670.80 -46.5 -46.2 -46.6 66 0 SPO 1997 04 09 17 01 356 6.8 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 02 356 6.7 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 03 355 6.6 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 04 354 6.7 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 05 354 6.7 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 06 353 6.7 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 07 355 6.5 -9 670.80 -46.5 -46.2 -46.7 66 -99 SPO 1997 04 09 17 08 356 6.7 -9 670.80 -46.5 -46.2 -46.6 66 -99 SPO 1997 04 09 17 09 357 6.6 -9 670.80 -46.5 -46.2 -46.6 65 -99 SPO 1997 04 09 17 10 359 6.6 -9 670.80 -46.5 -46.3 -46.6 65 -99 SPO 1997 04 09 17 11 1 6.6 -9 670.80 -46.5 -46.3 -46.6 65 -99 SPO 1997 04 09 17 12 3 6.5 -9 670.80 -46.5 -46.3 -46.6 66 -99 SPO 1997 04 09 17 13 2 6.3 -9 670.80 -46.5 -46.3 -46.6 66 -99 SPO 1997 04 09 17 14 1 6.3 -9 670.80 -46.5 -46.3 -46.6 66 -99 SPO 1997 04 09 17 15 359 6.4 -9 670.80 -46.5 -46.3 -46.6 66 -99 SPO 1997 04 09 17 16 356 6.3 -9 670.80 -46.5 -46.4 -46.6 66 -99 SPO 1997 04 09 17 17 355 6.8 -9 670.80 -46.5 -46.3 -46.6 66 -99 SPO 1997 04 09 17 18 355 6.8 -9 670.80 -46.5 -46.3 -46.5 66 -99 SPO 1997 04 09 17 19 355 7.3 -9 670.80 -46.5 -46.3 -46.5 66 -99 SPO 1997 04 09 17 20 354 7.2 -9 670.80 -46.4 -46.3 -46.5 65 -99 SPO 1997 04 09 17 21 354 7.3 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 22 355 7.5 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 23 355 7.3 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 24 353 7.0 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 25 354 7.2 -9 670.80 -46.5 -46.4 -46.6 67 -99 SPO 1997 04 09 17 26 354 7.4 -9 670.80 -46.5 -46.4 -46.6 67 -99 SPO 1997 04 09 17 27 354 7.5 -9 670.80 -46.5 -46.4 -46.6 67 -99 SPO 1997 04 09 17 28 354 7.2 -9 670.80 -46.4 -46.4 -46.6 66 -99 SPO 1997 04 09 17 29 355 7.5 -9 670.80 -46.4 -46.4 -46.5 66 -99 SPO 1997 04 09 17 30 355 7.5 -9 670.80 -46.4 -46.4 -46.5 66 -99 SPO 1997 04 09 17 31 356 7.4 -9 670.80 -46.4 -46.4 -46.5 66 -99 SPO 1997 04 09 17 32 355 7.3 -9 670.80 -46.4 -46.4 -46.5 66 -99 SPO 1997 04 09 17 33 354 7.8 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 34 353 7.5 -9 670.70 -46.4 -46.3 -46.5 65 -99 SPO 1997 04 09 17 35 353 7.4 -9 670.80 -46.4 -46.4 -46.5 64 -99 SPO 1997 04 09 17 36 355 7.2 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 37 357 7.3 -9 670.80 -46.4 -46.4 -46.5 65 -99 SPO 1997 04 09 17 38 357 7.6 -9 670.80 -46.4 -46.5 -46.6 66 -99 SPO 1997 04 09 17 39 358 7.4 -9 670.80 -46.5 -46.5 -46.6 67 -99 SPO 1997 04 09 17 40 358 7.3 -9 670.80 -46.5 -46.5 -46.6 67 -99 SPO 1997 04 09 17 41 357 7.1 -9 670.70 -46.5 -46.5 -46.7 67 -99 SPO 1997 04 09 17 42 357 7.0 -9 670.70 -46.6 -46.5 -46.7 67 -99 SPO 1997 04 09 17 43 356 6.9 -9 670.70 -46.6 -46.5 -46.7 67 -99 SPO 1997 04 09 17 44 357 7.0 -9 670.70 -46.6 -46.5 -46.7 66 -99 SPO 1997 04 09 17 45 360 7.0 -9 670.70 -46.6 -46.6 -46.7 66 -99 SPO 1997 04 09 17 46 0 6.9 -9 670.80 -46.6 -46.6 -46.8 65 -99 SPO 1997 04 09 17 47 0 7.0 -9 670.80 -46.7 -46.6 -46.8 65 -99 SPO 1997 04 09 17 48 359 6.8 -9 670.80 -46.7 -46.7 -46.9 65 -99 SPO 1997 04 09 17 49 358 6.8 -9 670.70 -46.7 -46.7 -46.9 64 -99 SPO 1997 04 09 17 50 355 6.8 -9 670.70 -46.8 -46.7 -46.9 65 -99 SPO 1997 04 09 17 51 354 7.0 -9 670.70 -46.8 -46.7 -46.9 66 -99 SPO 1997 04 09 17 52 352 6.9 -9 670.70 -46.8 -46.6 -46.9 66 -99 SPO 1997 04 09 17 53 352 7.4 -9 670.70 -46.8 -46.6 -46.9 66 -99 SPO 1997 04 09 17 54 354 7.6 -9 670.70 -46.8 -46.7 -46.9 65 -99 SPO 1997 04 09 17 55 354 7.7 -9 670.70 -46.8 -46.7 -46.9 65 -99 SPO 1997 04 09 17 56 354 8.0 -9 670.70 -46.8 -46.8 -46.9 66 -99 SPO 1997 04 09 17 57 354 7.9 -9 670.70 -46.8 -46.8 -46.9 66 -99 SPO 1997 04 09 17 58 354 7.8 -9 670.70 -46.8 -46.8 -46.9 65 -99 SPO 1997 04 09 17 59 354 7.9 -9 670.70 -46.8 -46.8 -47.0 65 -99 SPO 1997 04 09 18 00 354 7.8 -9 670.60 -46.9 -46.9 -47.0 65 0 SPO 1997 04 09 18 01 353 8.4 -9 670.60 -46.9 -46.9 -47.0 65 -99 SPO 1997 04 09 18 02 353 8.0 -9 670.60 -46.9 -46.9 -47.0 65 -99 SPO 1997 04 09 18 03 353 8.0 -9 670.60 -46.9 -46.8 -47.0 66 -99 SPO 1997 04 09 18 04 354 7.8 -9 670.60 -46.9 -46.8 -47.0 67 -99 SPO 1997 04 09 18 05 355 7.7 -9 670.60 -46.9 -46.9 -47.0 67 -99 SPO 1997 04 09 18 06 355 7.9 -9 670.60 -46.9 -46.9 -47.1 66 -99 SPO 1997 04 09 18 07 356 7.9 -9 670.70 -47.0 -46.9 -47.1 67 -99 SPO 1997 04 09 18 08 356 7.7 -9 670.70 -47.0 -46.9 -47.1 67 -99 SPO 1997 04 09 18 09 356 7.9 -9 670.70 -47.0 -46.9 -47.1 66 -99 SPO 1997 04 09 18 10 356 7.5 -9 670.70 -47.0 -46.9 -47.1 65 -99 SPO 1997 04 09 18 11 357 7.4 -9 670.70 -47.0 -46.9 -47.1 65 -99 SPO 1997 04 09 18 12 358 7.3 -9 670.70 -47.0 -47.0 -47.1 65 -99 SPO 1997 04 09 18 13 359 7.3 -9 670.70 -47.1 -47.0 -47.2 64 -99 SPO 1997 04 09 18 14 358 7.3 -9 670.70 -47.1 -47.0 -47.2 64 -99 SPO 1997 04 09 18 15 357 7.4 -9 670.70 -47.1 -47.1 -47.2 64 -99 SPO 1997 04 09 18 16 357 7.2 -9 670.70 -47.1 -47.1 -47.2 65 -99 SPO 1997 04 09 18 17 358 7.4 -9 670.70 -47.1 -47.2 -47.3 66 -99 SPO 1997 04 09 18 18 358 7.1 -9 670.70 -47.2 -47.2 -47.3 67 -99 SPO 1997 04 09 18 19 358 7.1 -9 670.70 -47.2 -47.2 -47.3 67 -99 SPO 1997 04 09 18 20 356 7.5 -9 670.60 -47.2 -47.2 -47.3 67 -99 SPO 1997 04 09 18 21 356 7.6 -9 670.60 -47.2 -47.2 -47.3 67 -99 SPO 1997 04 09 18 22 356 7.4 -9 670.60 -47.2 -47.2 -47.3 66 -99 SPO 1997 04 09 18 23 357 7.5 -9 670.60 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 24 357 7.7 -9 670.60 -47.3 -47.2 -47.4 65 -99 SPO 1997 04 09 18 25 358 7.7 -9 670.60 -47.3 -47.2 -47.4 64 -99 SPO 1997 04 09 18 26 358 7.6 -9 670.60 -47.3 -47.3 -47.4 64 -99 SPO 1997 04 09 18 27 357 7.7 -9 670.50 -47.3 -47.2 -47.4 64 -99 SPO 1997 04 09 18 28 357 8.0 -9 670.50 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 29 357 7.9 -9 670.50 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 30 357 7.9 -9 670.50 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 31 357 7.9 -9 670.60 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 32 357 8.3 -9 670.50 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 33 358 8.1 -9 670.50 -47.3 -47.2 -47.4 66 -99 SPO 1997 04 09 18 34 357 7.9 -9 670.50 -47.3 -47.2 -47.4 65 -99 SPO 1997 04 09 18 35 356 8.0 -9 670.50 -47.3 -47.3 -47.4 65 -99 SPO 1997 04 09 18 36 356 8.0 -9 670.50 -47.3 -47.4 -47.4 65 -99 SPO 1997 04 09 18 37 356 8.0 -9 670.50 -47.3 -47.4 -47.4 64 -99 SPO 1997 04 09 18 38 355 7.8 -9 670.50 -47.3 -47.4 -47.5 64 -99 SPO 1997 04 09 18 39 356 7.9 -9 670.50 -47.4 -47.4 -47.5 65 -99 SPO 1997 04 09 18 40 356 7.8 -9 670.50 -47.4 -47.4 -47.5 66 -99 SPO 1997 04 09 18 41 356 8.1 -9 670.50 -47.4 -47.4 -47.5 66 -99 SPO 1997 04 09 18 42 355 8.1 -9 670.50 -47.4 -47.4 -47.5 66 -99 SPO 1997 04 09 18 43 356 8.5 -9 670.50 -47.4 -47.4 -47.5 66 -99 SPO 1997 04 09 18 44 356 8.4 -9 670.50 -47.4 -47.4 -47.5 66 -99 SPO 1997 04 09 18 45 355 8.3 -9 670.50 -47.4 -47.4 -47.5 67 -99 SPO 1997 04 09 18 46 355 8.3 -9 670.50 -47.4 -47.4 -47.5 67 -99 SPO 1997 04 09 18 47 355 8.3 -9 670.50 -47.4 -47.4 -47.6 66 -99 SPO 1997 04 09 18 48 355 8.5 -9 670.50 -47.4 -47.4 -47.6 65 -99 SPO 1997 04 09 18 49 355 8.4 -9 670.50 -47.5 -47.4 -47.6 65 -99 SPO 1997 04 09 18 50 356 8.4 -9 670.50 -47.5 -47.4 -47.6 65 -99 SPO 1997 04 09 18 51 355 8.1 -9 670.50 -47.5 -47.4 -47.6 64 -99 SPO 1997 04 09 18 52 356 8.1 -9 670.50 -47.5 -47.4 -47.6 65 -99 SPO 1997 04 09 18 53 355 8.2 -9 670.50 -47.5 -47.4 -47.6 65 -99 SPO 1997 04 09 18 54 356 8.1 -9 670.40 -47.5 -47.5 -47.6 65 -99 SPO 1997 04 09 18 55 356 8.5 -9 670.40 -47.5 -47.6 -47.6 65 -99 SPO 1997 04 09 18 56 356 8.5 -9 670.50 -47.5 -47.6 -47.6 66 -99 SPO 1997 04 09 18 57 356 8.4 -9 670.50 -47.5 -47.6 -47.6 65 -99 SPO 1997 04 09 18 58 356 8.0 -9 670.50 -47.5 -47.6 -47.6 65 -99 SPO 1997 04 09 18 59 356 8.3 -9 670.50 -47.5 -47.6 -47.6 65 -99 SPO 1997 04 09 19 00 356 8.3 -9 670.50 -47.6 -47.6 -47.6 65 0 SPO 1997 04 09 19 01 355 8.1 -9 670.50 -47.6 -47.6 -47.6 65 -99 SPO 1997 04 09 19 02 356 7.8 -9 670.50 -47.6 -47.6 -47.7 65 -99 SPO 1997 04 09 19 03 355 8.0 -9 670.50 -47.6 -47.6 -47.7 64 -99 SPO 1997 04 09 19 04 355 8.2 -9 670.50 -47.6 -47.6 -47.8 64 -99 SPO 1997 04 09 19 05 355 8.3 -9 670.50 -47.6 -47.6 -47.8 64 -99 SPO 1997 04 09 19 06 356 8.6 -9 670.50 -47.6 -47.7 -47.8 65 -99 SPO 1997 04 09 19 07 355 8.4 -9 670.50 -47.6 -47.6 -47.8 65 -99 SPO 1997 04 09 19 08 355 8.4 -9 670.50 -47.6 -47.6 -47.7 66 -99 SPO 1997 04 09 19 09 355 8.6 -9 670.50 -47.6 -47.6 -47.7 66 -99 SPO 1997 04 09 19 10 355 8.4 -9 670.50 -47.6 -47.6 -47.7 66 -99 SPO 1997 04 09 19 11 355 8.6 -9 670.50 -47.6 -47.6 -47.7 66 -99 SPO 1997 04 09 19 12 355 8.6 -9 670.50 -47.6 -47.6 -47.7 65 -99 SPO 1997 04 09 19 13 354 8.3 -9 670.50 -47.6 -47.6 -47.8 64 -99 SPO 1997 04 09 19 14 355 8.5 -9 670.40 -47.6 -47.7 -47.8 64 -99 SPO 1997 04 09 19 15 355 8.4 -9 670.40 -47.7 -47.7 -47.8 64 -99 SPO 1997 04 09 19 16 354 8.4 -9 670.40 -47.7 -47.8 -47.8 64 -99 SPO 1997 04 09 19 17 354 8.4 -9 670.50 -47.7 -47.8 -47.8 64 -99 SPO 1997 04 09 19 18 354 8.6 -9 670.40 -47.7 -47.7 -47.8 65 -99 SPO 1997 04 09 19 19 355 8.5 -9 670.40 -47.7 -47.7 -47.8 65 -99 SPO 1997 04 09 19 20 356 8.5 -9 670.40 -47.7 -47.7 -47.7 65 -99 SPO 1997 04 09 19 21 356 8.2 -9 670.40 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 22 357 8.2 -9 670.40 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 23 357 8.2 -9 670.40 -47.7 -47.8 -47.8 66 -99 SPO 1997 04 09 19 24 357 8.6 -9 670.40 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 25 358 8.3 -9 670.40 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 26 358 8.5 -9 670.40 -47.7 -47.7 -47.8 65 -99 SPO 1997 04 09 19 27 358 8.2 -9 670.40 -47.7 -47.7 -47.8 64 -99 SPO 1997 04 09 19 28 359 8.1 -9 670.40 -47.7 -47.7 -47.8 64 -99 SPO 1997 04 09 19 29 359 8.5 -9 670.40 -47.7 -47.7 -47.8 64 -99 SPO 1997 04 09 19 30 0 8.6 -9 670.40 -47.7 -47.7 -47.8 65 -99 SPO 1997 04 09 19 31 360 8.6 -9 670.40 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 32 360 8.4 -9 670.40 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 33 1 8.3 -9 670.50 -47.7 -47.7 -47.8 66 -99 SPO 1997 04 09 19 34 2 8.3 -9 670.40 -47.7 -47.8 -47.8 66 -99 SPO 1997 04 09 19 35 2 8.1 -9 670.40 -47.7 -47.9 -47.8 66 -99 SPO 1997 04 09 19 36 2 7.9 -9 670.40 -47.7 -47.9 -47.8 66 -99 SPO 1997 04 09 19 37 2 7.3 -9 670.50 -47.7 -47.9 -47.9 66 -99 SPO 1997 04 09 19 38 4 7.8 -9 670.50 -47.7 -47.9 -47.9 65 -99 SPO 1997 04 09 19 39 5 7.9 -9 670.50 -47.8 -48.0 -47.9 66 -99 SPO 1997 04 09 19 40 4 8.0 -9 670.50 -47.8 -47.9 -47.9 66 -99 SPO 1997 04 09 19 41 4 8.3 -9 670.40 -47.8 -48.0 -47.9 66 -99 SPO 1997 04 09 19 42 4 7.6 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 19 43 2 8.1 -9 670.50 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 19 44 2 7.9 -9 670.50 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 19 45 2 7.9 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 19 46 3 7.8 -9 670.50 -47.8 -47.9 -47.9 66 -99 SPO 1997 04 09 19 47 2 7.8 -9 670.40 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 09 19 48 3 7.9 -9 670.40 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 09 19 49 2 8.1 -9 670.50 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 09 19 50 2 8.2 -9 670.40 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 09 19 51 3 7.6 -9 670.50 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 09 19 52 3 8.0 -9 670.50 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 09 19 53 3 7.4 -9 670.40 -47.8 -47.9 -47.8 65 -99 SPO 1997 04 09 19 54 4 7.5 -9 670.40 -47.8 -47.9 -47.8 66 -99 SPO 1997 04 09 19 55 3 7.5 -9 670.40 -47.7 -48.0 -47.8 66 -99 SPO 1997 04 09 19 56 4 8.0 -9 670.40 -47.7 -48.0 -47.8 66 -99 SPO 1997 04 09 19 57 3 8.1 -9 670.40 -47.7 -48.0 -47.8 66 -99 SPO 1997 04 09 19 58 3 7.8 -9 670.40 -47.7 -48.0 -47.8 66 -99 SPO 1997 04 09 19 59 3 8.1 -9 670.40 -47.7 -48.0 -47.9 66 -99 SPO 1997 04 09 20 00 4 8.3 -9 670.40 -47.8 -48.0 -47.9 67 0 SPO 1997 04 09 20 01 3 8.5 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 20 02 3 8.1 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 20 03 3 8.2 -9 670.40 -47.8 -47.9 -47.9 66 -99 SPO 1997 04 09 20 04 4 8.2 -9 670.40 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 09 20 05 3 8.0 -9 670.40 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 09 20 06 4 7.8 -9 670.40 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 09 20 07 4 7.8 -9 670.40 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 09 20 08 4 8.2 -9 670.40 -47.8 -47.9 -47.9 66 -99 SPO 1997 04 09 20 09 5 7.9 -9 670.40 -47.8 -47.9 -47.9 66 -99 SPO 1997 04 09 20 10 5 7.5 -9 670.40 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 09 20 11 5 8.0 -9 670.40 -47.8 -47.9 -47.9 66 -99 SPO 1997 04 09 20 12 3 8.0 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 20 13 3 8.1 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 20 14 4 8.1 -9 670.40 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 09 20 15 3 7.8 -9 670.40 -47.8 -48.1 -47.9 65 -99 SPO 1997 04 09 20 16 3 8.1 -9 670.40 -47.8 -48.1 -48.0 65 -99 SPO 1997 04 09 20 17 2 8.0 -9 670.40 -47.8 -48.1 -48.0 65 -99 SPO 1997 04 09 20 18 2 8.7 -9 670.40 -47.8 -48.1 -48.0 65 -99 SPO 1997 04 09 20 19 1 8.2 -9 670.30 -47.9 -48.1 -48.0 66 -99 SPO 1997 04 09 20 20 2 8.5 -9 670.40 -47.9 -48.1 -48.0 66 -99 SPO 1997 04 09 20 21 1 8.5 -9 670.30 -47.9 -48.1 -48.0 66 -99 SPO 1997 04 09 20 22 2 8.3 -9 670.30 -47.9 -48.1 -48.0 66 -99 SPO 1997 04 09 20 23 1 8.2 -9 670.30 -47.9 -48.1 -48.0 67 -99 SPO 1997 04 09 20 24 1 8.4 -9 670.30 -47.9 -48.0 -48.0 67 -99 SPO 1997 04 09 20 25 1 9.0 -9 670.30 -47.9 -48.0 -48.0 67 -99 SPO 1997 04 09 20 26 1 8.4 -9 670.30 -47.9 -48.0 -48.0 67 -99 SPO 1997 04 09 20 27 1 8.2 -9 670.40 -47.9 -48.0 -48.0 66 -99 SPO 1997 04 09 20 28 3 8.1 -9 670.40 -47.9 -48.0 -48.0 66 -99 SPO 1997 04 09 20 29 2 8.4 -9 670.30 -47.9 -48.0 -48.0 66 -99 SPO 1997 04 09 20 30 360 8.5 -9 670.30 -47.9 -48.0 -48.0 65 -99 SPO 1997 04 09 20 31 360 8.6 -9 670.30 -47.8 -48.0 -48.0 64 -99 SPO 1997 04 09 20 32 359 8.9 -9 670.30 -47.8 -48.0 -48.0 65 -99 SPO 1997 04 09 20 33 0 8.4 -9 670.30 -47.8 -48.1 -48.0 66 -99 SPO 1997 04 09 20 34 3 8.4 -9 670.30 -47.8 -48.1 -48.0 67 -99 SPO 1997 04 09 20 35 2 8.0 -9 670.30 -47.8 -48.1 -48.0 67 -99 SPO 1997 04 09 20 36 2 8.3 -9 670.30 -47.8 -48.1 -48.0 66 -99 SPO 1997 04 09 20 37 2 8.5 -9 670.40 -47.9 -48.1 -48.0 67 -99 SPO 1997 04 09 20 38 1 8.6 -9 670.40 -47.9 -48.1 -48.0 67 -99 SPO 1997 04 09 20 39 1 8.6 -9 670.40 -47.9 -48.1 -48.1 66 -99 SPO 1997 04 09 20 40 360 8.7 -9 670.30 -48.0 -48.1 -48.0 66 -99 SPO 1997 04 09 20 41 359 8.4 -9 670.30 -48.0 -48.1 -48.1 66 -99 SPO 1997 04 09 20 42 359 9.2 -9 670.30 -48.0 -48.1 -48.1 65 -99 SPO 1997 04 09 20 43 358 8.7 -9 670.30 -48.0 -48.2 -48.1 66 -99 SPO 1997 04 09 20 44 359 8.8 -9 670.30 -48.0 -48.1 -48.1 66 -99 SPO 1997 04 09 20 45 359 8.8 -9 670.30 -48.0 -48.1 -48.1 66 -99 SPO 1997 04 09 20 46 359 8.8 -9 670.30 -48.0 -48.1 -48.1 66 -99 SPO 1997 04 09 20 47 359 8.4 -9 670.30 -48.0 -48.1 -48.1 67 -99 SPO 1997 04 09 20 48 359 8.2 -9 670.40 -48.0 -48.1 -48.1 67 -99 SPO 1997 04 09 20 49 0 8.3 -9 670.40 -48.0 -48.1 -48.1 67 -99 SPO 1997 04 09 20 50 359 8.1 -9 670.40 -48.0 -48.2 -48.2 65 -99 SPO 1997 04 09 20 51 358 8.6 -9 670.40 -48.0 -48.2 -48.1 65 -99 SPO 1997 04 09 20 52 357 8.7 -9 670.40 -48.0 -48.2 -48.2 65 -99 SPO 1997 04 09 20 53 357 8.8 -9 670.30 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 09 20 54 357 9.2 -9 670.30 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 09 20 55 357 9.3 -9 670.30 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 09 20 56 357 9.4 -9 670.30 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 09 20 57 358 8.9 -9 670.30 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 09 20 58 357 9.0 -9 670.30 -48.1 -48.3 -48.3 66 -99 SPO 1997 04 09 20 59 357 8.9 -9 670.40 -48.2 -48.3 -48.2 67 -99 SPO 1997 04 09 21 00 358 8.7 -9 670.30 -48.2 -48.3 -48.3 67 0 SPO 1997 04 09 21 01 358 8.6 -9 670.30 -48.2 -48.3 -48.3 66 -99 SPO 1997 04 09 21 02 358 8.6 -9 670.30 -48.2 -48.3 -48.3 66 -99 SPO 1997 04 09 21 03 356 8.8 -9 670.30 -48.2 -48.3 -48.3 66 -99 SPO 1997 04 09 21 04 357 8.4 -9 670.30 -48.2 -48.3 -48.3 65 -99 SPO 1997 04 09 21 05 358 8.4 -9 670.40 -48.2 -48.2 -48.3 65 -99 SPO 1997 04 09 21 06 358 8.5 -9 670.40 -48.2 -48.2 -48.3 65 -99 SPO 1997 04 09 21 07 357 8.6 -9 670.30 -48.2 -48.3 -48.3 65 -99 SPO 1997 04 09 21 08 358 8.7 -9 670.30 -48.2 -48.3 -48.3 65 -99 SPO 1997 04 09 21 09 357 8.6 -9 670.30 -48.3 -48.3 -48.4 66 -99 SPO 1997 04 09 21 10 355 8.4 -9 670.30 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 09 21 11 356 8.5 -9 670.40 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 09 21 12 356 8.4 -9 670.30 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 09 21 13 356 8.3 -9 670.40 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 09 21 14 357 8.3 -9 670.40 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 09 21 15 357 8.2 -9 670.30 -48.3 -48.5 -48.5 65 -99 SPO 1997 04 09 21 16 357 8.3 -9 670.30 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 21 17 356 8.3 -9 670.30 -48.3 -48.5 -48.4 64 -99 SPO 1997 04 09 21 18 357 8.2 -9 670.30 -48.3 -48.5 -48.4 64 -99 SPO 1997 04 09 21 19 357 8.6 -9 670.30 -48.3 -48.5 -48.4 64 -99 SPO 1997 04 09 21 20 357 8.4 -9 670.30 -48.3 -48.5 -48.4 65 -99 SPO 1997 04 09 21 21 357 8.2 -9 670.30 -48.3 -48.5 -48.4 65 -99 SPO 1997 04 09 21 22 357 8.4 -9 670.30 -48.3 -48.5 -48.5 66 -99 SPO 1997 04 09 21 23 356 8.2 -9 670.30 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 09 21 24 356 8.5 -9 670.30 -48.4 -48.5 -48.4 66 -99 SPO 1997 04 09 21 25 355 9.0 -9 670.30 -48.4 -48.5 -48.4 66 -99 SPO 1997 04 09 21 26 355 8.9 -9 670.30 -48.4 -48.5 -48.4 66 -99 SPO 1997 04 09 21 27 356 8.7 -9 670.30 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 21 28 357 8.4 -9 670.20 -48.4 -48.5 -48.5 65 -99 SPO 1997 04 09 21 29 356 9.1 -9 670.20 -48.4 -48.5 -48.5 65 -99 SPO 1997 04 09 21 30 356 9.1 -9 670.20 -48.4 -48.5 -48.5 65 -99 SPO 1997 04 09 21 31 356 9.4 -9 670.20 -48.4 -48.5 -48.5 65 -99 SPO 1997 04 09 21 32 356 9.6 -9 670.20 -48.4 -48.5 -48.5 65 -99 SPO 1997 04 09 21 33 356 9.4 -9 670.20 -48.4 -48.5 -48.5 65 -99 SPO 1997 04 09 21 34 356 9.2 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 21 35 357 9.6 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 21 36 358 9.4 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 21 37 357 9.6 -9 670.20 -48.4 -48.6 -48.6 66 -99 SPO 1997 04 09 21 38 358 9.4 -9 670.20 -48.4 -48.6 -48.6 66 -99 SPO 1997 04 09 21 39 358 9.0 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 40 358 9.4 -9 670.10 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 41 357 9.1 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 42 357 9.6 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 43 357 9.1 -9 670.20 -48.6 -48.6 -48.6 66 -99 SPO 1997 04 09 21 44 358 9.2 -9 670.20 -48.6 -48.6 -48.7 66 -99 SPO 1997 04 09 21 45 357 9.4 -9 670.20 -48.6 -48.6 -48.7 66 -99 SPO 1997 04 09 21 46 358 9.7 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 47 358 9.5 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 48 357 9.2 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 49 358 9.3 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 50 357 8.8 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 51 358 8.5 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 52 358 8.4 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 53 359 9.3 -9 670.20 -48.5 -48.6 -48.5 66 -99 SPO 1997 04 09 21 54 359 9.2 -9 670.20 -48.5 -48.5 -48.5 66 -99 SPO 1997 04 09 21 55 0 9.0 -9 670.20 -48.5 -48.5 -48.5 66 -99 SPO 1997 04 09 21 56 360 8.7 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 57 0 9.2 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 58 2 9.0 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 21 59 2 8.9 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 00 1 8.9 -9 670.20 -48.5 -48.6 -48.6 66 0 SPO 1997 04 09 22 01 2 8.9 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 02 3 9.3 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 03 2 9.3 -9 670.10 -48.6 -48.6 -48.6 68 -99 SPO 1997 04 09 22 04 2 9.5 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 05 2 9.3 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 06 2 9.3 -9 670.10 -48.5 -48.6 -48.6 65 -99 SPO 1997 04 09 22 07 3 8.9 -9 670.20 -48.5 -48.6 -48.6 65 -99 SPO 1997 04 09 22 08 2 8.8 -9 670.20 -48.5 -48.7 -48.6 65 -99 SPO 1997 04 09 22 09 2 8.9 -9 670.20 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 09 22 10 3 8.1 -9 670.20 -48.5 -48.7 -48.7 66 -99 SPO 1997 04 09 22 11 3 8.5 -9 670.20 -48.5 -48.7 -48.7 66 -99 SPO 1997 04 09 22 12 4 8.3 -9 670.30 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 13 3 8.1 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 14 4 8.0 -9 670.30 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 15 5 8.0 -9 670.30 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 09 22 16 6 8.1 -9 670.30 -48.6 -48.7 -48.7 66 -99 SPO 1997 04 09 22 17 5 8.7 -9 670.30 -48.6 -48.7 -48.7 66 -99 SPO 1997 04 09 22 18 4 8.3 -9 670.30 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 19 4 8.3 -9 670.30 -48.6 -48.7 -48.7 64 -99 SPO 1997 04 09 22 20 5 8.3 -9 670.30 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 21 5 7.5 -9 670.30 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 22 7 7.1 -9 670.30 -48.7 -48.8 -48.8 66 -99 SPO 1997 04 09 22 23 8 7.4 -9 670.30 -48.6 -48.8 -48.8 66 -99 SPO 1997 04 09 22 24 10 7.2 -9 670.40 -48.6 -48.8 -48.8 64 -99 SPO 1997 04 09 22 25 10 7.3 -9 670.40 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 26 9 7.6 -9 670.30 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 27 8 7.9 -9 670.30 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 28 7 7.8 -9 670.30 -48.6 -48.8 -48.6 66 -99 SPO 1997 04 09 22 29 7 7.4 -9 670.30 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 30 7 7.3 -9 670.40 -48.6 -48.9 -48.7 64 -99 SPO 1997 04 09 22 31 7 7.6 -9 670.30 -48.6 -48.9 -48.7 64 -99 SPO 1997 04 09 22 32 7 7.4 -9 670.30 -48.6 -48.9 -48.7 64 -99 SPO 1997 04 09 22 33 6 7.4 -9 670.30 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 34 7 8.2 -9 670.30 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 35 7 7.6 -9 670.30 -48.6 -48.7 -48.7 66 -99 SPO 1997 04 09 22 36 10 7.5 -9 670.30 -48.6 -48.7 -48.7 66 -99 SPO 1997 04 09 22 37 10 7.5 -9 670.30 -48.6 -48.7 -48.6 66 -99 SPO 1997 04 09 22 38 11 7.1 -9 670.30 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 09 22 39 13 7.3 -9 670.30 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 40 10 7.6 -9 670.30 -48.5 -48.6 -48.5 66 -99 SPO 1997 04 09 22 41 9 8.5 -9 670.30 -48.5 -48.6 -48.5 66 -99 SPO 1997 04 09 22 42 5 8.7 -9 670.20 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 22 43 6 8.8 -9 670.20 -48.4 -48.6 -48.6 64 -99 SPO 1997 04 09 22 44 5 8.0 -9 670.20 -48.5 -48.7 -48.7 63 -99 SPO 1997 04 09 22 45 5 8.3 -9 670.20 -48.5 -48.8 -48.7 65 -99 SPO 1997 04 09 22 46 7 8.5 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 47 6 8.4 -9 670.20 -48.5 -48.8 -48.7 66 -99 SPO 1997 04 09 22 48 7 8.5 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 49 5 8.6 -9 670.20 -48.6 -48.8 -48.7 67 -99 SPO 1997 04 09 22 50 5 8.3 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 51 5 8.5 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 52 5 8.5 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 22 53 3 8.4 -9 670.20 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 54 5 8.2 -9 670.20 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 55 4 8.7 -9 670.30 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 56 5 8.5 -9 670.30 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 22 57 6 8.2 -9 670.30 -48.6 -48.7 -48.7 66 -99 SPO 1997 04 09 22 58 6 8.0 -9 670.30 -48.6 -48.7 -48.6 66 -99 SPO 1997 04 09 22 59 6 8.4 -9 670.20 -48.6 -48.7 -48.6 66 -99 SPO 1997 04 09 23 00 7 8.6 -9 670.20 -48.5 -48.7 -48.6 66 0 SPO 1997 04 09 23 01 6 8.5 -9 670.20 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 09 23 02 5 8.6 -9 670.20 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 09 23 03 5 8.9 -9 670.20 -48.5 -48.7 -48.7 66 -99 SPO 1997 04 09 23 04 5 8.7 -9 670.20 -48.5 -48.8 -48.7 66 -99 SPO 1997 04 09 23 05 5 8.4 -9 670.20 -48.5 -48.8 -48.7 66 -99 SPO 1997 04 09 23 06 6 8.4 -9 670.30 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 09 23 07 8 8.6 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 08 7 8.7 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 09 6 9.4 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 10 7 9.0 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 11 7 8.9 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 12 5 9.0 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 13 7 9.1 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 14 5 9.0 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 15 5 8.8 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 16 5 9.1 -9 670.20 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 17 6 9.0 -9 670.20 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 23 18 5 9.1 -9 670.20 -48.6 -48.8 -48.7 64 -99 SPO 1997 04 09 23 19 6 8.7 -9 670.20 -48.6 -48.7 -48.7 64 -99 SPO 1997 04 09 23 20 5 9.0 -9 670.20 -48.6 -48.7 -48.7 63 -99 SPO 1997 04 09 23 21 6 9.8 -9 670.10 -48.6 -48.7 -48.7 63 -99 SPO 1997 04 09 23 22 6 9.6 -9 670.10 -48.6 -48.7 -48.7 64 -99 SPO 1997 04 09 23 23 5 9.6 -9 670.10 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 24 5 10.1 -9 670.10 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 25 5 10.0 -9 670.10 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 26 5 9.5 -9 670.10 -48.6 -48.7 -48.7 67 -99 SPO 1997 04 09 23 27 6 9.9 -9 670.10 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 09 23 28 5 9.9 -9 670.10 -48.6 -48.7 -48.7 66 -99 SPO 1997 04 09 23 29 6 9.8 -9 670.10 -48.6 -48.7 -48.6 66 -99 SPO 1997 04 09 23 30 5 9.8 -9 670.10 -48.6 -48.7 -48.6 66 -99 SPO 1997 04 09 23 31 5 10.0 -9 670.10 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 09 23 32 4 10.3 -9 670.10 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 23 33 4 9.8 -9 670.10 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 23 34 4 9.8 -9 670.10 -48.5 -48.6 -48.6 66 -99 SPO 1997 04 09 23 35 4 9.6 -9 670.10 -48.5 -48.6 -48.6 67 -99 SPO 1997 04 09 23 36 5 9.4 -9 670.10 -48.5 -48.6 -48.6 67 -99 SPO 1997 04 09 23 37 4 9.7 -9 670.10 -48.5 -48.5 -48.6 67 -99 SPO 1997 04 09 23 38 3 9.8 -9 670.20 -48.5 -48.5 -48.6 67 -99 SPO 1997 04 09 23 39 2 9.7 -9 670.10 -48.5 -48.5 -48.5 68 -99 SPO 1997 04 09 23 40 2 9.8 -9 670.20 -48.5 -48.5 -48.6 67 -99 SPO 1997 04 09 23 41 3 10.0 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 23 42 3 9.7 -9 670.10 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 09 23 43 3 10.0 -9 670.10 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 09 23 44 3 9.9 -9 670.20 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 09 23 45 2 9.4 -9 670.20 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 09 23 46 3 9.6 -9 670.20 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 09 23 47 3 9.7 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 23 48 3 9.3 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 23 49 4 9.0 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 23 50 6 9.2 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 23 51 8 8.7 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 09 23 52 6 9.0 -9 670.20 -48.4 -48.5 -48.5 67 -99 SPO 1997 04 09 23 53 7 9.1 -9 670.20 -48.4 -48.4 -48.4 67 -99 SPO 1997 04 09 23 54 6 9.1 -9 670.20 -48.4 -48.4 -48.4 66 -99 SPO 1997 04 09 23 55 6 9.4 -9 670.20 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 09 23 56 7 9.2 -9 670.20 -48.4 -48.4 -48.4 66 -99 SPO 1997 04 09 23 57 7 8.8 -9 670.20 -48.4 -48.4 -48.5 66 -99 SPO 1997 04 09 23 58 9 9.3 -9 670.20 -48.4 -48.4 -48.4 -99 -99 SPO 1997 04 09 23 59 8 9.2 -9 670.20 -48.3 -48.4 -48.4 -99 -99 SPO 1997 04 10 00 00 8 9.2 -9 670.20 -48.3 -48.4 -48.4 -99 0 SPO 1997 04 10 00 01 8 9.2 -9 670.20 -48.3 -48.4 -48.4 -99 -99 SPO 1997 04 10 00 02 7 9.0 -9 670.10 -48.3 -48.5 -48.4 -99 -99 SPO 1997 04 10 00 03 8 9.1 -9 670.10 -48.3 -48.5 -48.4 -99 -99 SPO 1997 04 10 00 04 7 9.3 -9 670.10 -48.3 -48.5 -48.4 -99 -99 SPO 1997 04 10 00 05 7 9.1 -9 670.10 -48.3 -48.5 -48.4 -99 -99 SPO 1997 04 10 00 06 8 9.5 -9 670.10 -48.3 -48.4 -48.3 -99 -99 SPO 1997 04 10 00 07 7 9.8 -9 670.10 -48.3 -48.4 -48.4 -99 -99 SPO 1997 04 10 00 08 8 9.5 -9 670.10 -48.3 -48.4 -48.3 -99 -99 SPO 1997 04 10 00 09 7 9.6 -9 670.00 -48.3 -48.4 -48.3 -99 -99 SPO 1997 04 10 00 10 10 9.9 -9 670.00 -48.2 -48.3 -48.3 -99 -99 SPO 1997 04 10 00 11 9 9.5 -9 670.10 -48.2 -48.4 -48.4 -99 -99 SPO 1997 04 10 00 12 9 9.3 -9 670.00 -48.3 -48.4 -48.4 -99 -99 SPO 1997 04 10 00 13 9 9.4 -9 670.10 -48.3 -48.4 -48.5 67 -99 SPO 1997 04 10 00 14 11 9.2 -9 670.10 -48.3 -48.4 -48.4 68 -99 SPO 1997 04 10 00 15 12 9.1 -9 670.10 -48.3 -48.4 -48.4 68 -99 SPO 1997 04 10 00 16 12 9.4 -9 670.10 -48.3 -48.4 -48.4 68 -99 SPO 1997 04 10 00 17 13 8.9 -9 670.10 -48.4 -48.4 -48.4 68 -99 SPO 1997 04 10 00 18 13 9.4 -9 670.10 -48.4 -48.4 -48.5 67 -99 SPO 1997 04 10 00 19 12 9.4 -9 670.10 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 10 00 20 12 9.9 -9 670.00 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 10 00 21 13 9.7 -9 670.00 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 10 00 22 14 9.2 -9 670.00 -48.3 -48.6 -48.5 66 -99 SPO 1997 04 10 00 23 14 8.8 -9 670.10 -48.4 -48.6 -48.5 67 -99 SPO 1997 04 10 00 24 16 8.9 -9 670.10 -48.4 -48.6 -48.5 67 -99 SPO 1997 04 10 00 25 15 9.1 -9 670.10 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 10 00 26 14 9.6 -9 670.10 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 10 00 27 14 9.4 -9 670.00 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 10 00 28 13 9.1 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 29 14 8.9 -9 670.00 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 30 14 9.3 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 31 15 9.2 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 32 15 8.7 -9 670.00 -48.4 -48.4 -48.5 65 -99 SPO 1997 04 10 00 33 15 8.5 -9 670.10 -48.4 -48.4 -48.5 65 -99 SPO 1997 04 10 00 34 17 8.9 -9 670.10 -48.4 -48.4 -48.5 66 -99 SPO 1997 04 10 00 35 17 8.7 -9 670.10 -48.4 -48.4 -48.4 66 -99 SPO 1997 04 10 00 36 16 9.1 -9 670.10 -48.4 -48.4 -48.5 66 -99 SPO 1997 04 10 00 37 16 9.2 -9 670.10 -48.4 -48.4 -48.4 66 -99 SPO 1997 04 10 00 38 16 8.6 -9 670.20 -48.4 -48.4 -48.5 66 -99 SPO 1997 04 10 00 39 16 8.0 -9 670.10 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 40 17 8.4 -9 670.20 -48.4 -48.6 -48.5 67 -99 SPO 1997 04 10 00 41 15 8.0 -9 670.20 -48.4 -48.6 -48.5 66 -99 SPO 1997 04 10 00 42 14 8.6 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 43 15 8.2 -9 670.20 -48.4 -48.5 -48.4 66 -99 SPO 1997 04 10 00 44 15 8.3 -9 670.20 -48.3 -48.5 -48.4 65 -99 SPO 1997 04 10 00 45 15 8.0 -9 670.20 -48.4 -48.5 -48.4 65 -99 SPO 1997 04 10 00 46 15 8.1 -9 670.20 -48.4 -48.5 -48.4 66 -99 SPO 1997 04 10 00 47 15 8.6 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 48 15 8.2 -9 670.20 -48.4 -48.5 -48.5 66 -99 SPO 1997 04 10 00 49 15 7.8 -9 670.20 -48.4 -48.5 -48.5 67 -99 SPO 1997 04 10 00 50 15 8.2 -9 670.20 -48.4 -48.5 -48.4 68 -99 SPO 1997 04 10 00 51 14 8.0 -9 670.20 -48.3 -48.5 -48.5 67 -99 SPO 1997 04 10 00 52 14 8.6 -9 670.20 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 10 00 53 12 8.7 -9 670.10 -48.4 -48.4 -48.4 66 -99 SPO 1997 04 10 00 54 12 8.9 -9 670.10 -48.4 -48.4 -48.4 66 -99 SPO 1997 04 10 00 55 13 8.9 -9 670.10 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 10 00 56 11 8.4 -9 670.10 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 10 00 57 11 8.2 -9 670.10 -48.3 -48.4 -48.4 66 -99 SPO 1997 04 10 00 58 12 8.4 -9 670.10 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 10 00 59 10 8.7 -9 670.10 -48.3 -48.5 -48.4 66 -99 SPO 1997 04 10 01 00 10 8.6 -9 670.10 -48.3 -48.4 -48.4 66 0 SPO 1997 04 10 01 01 9 8.8 -9 670.00 -48.3 -48.4 -48.3 67 -99 SPO 1997 04 10 01 02 9 8.6 -9 670.00 -48.3 -48.4 -48.3 67 -99 SPO 1997 04 10 01 03 9 9.2 -9 670.00 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 01 04 10 8.5 -9 670.00 -48.3 -48.4 -48.3 67 -99 SPO 1997 04 10 01 05 10 8.5 -9 670.00 -48.2 -48.4 -48.3 67 -99 SPO 1997 04 10 01 06 12 8.2 -9 670.00 -48.2 -48.4 -48.3 67 -99 SPO 1997 04 10 01 07 12 9.6 -9 670.00 -48.2 -48.3 -48.3 67 -99 SPO 1997 04 10 01 08 12 9.4 -9 670.00 -48.2 -48.3 -48.3 67 -99 SPO 1997 04 10 01 09 10 9.2 -9 670.00 -48.2 -48.3 -48.3 67 -99 SPO 1997 04 10 01 10 10 9.8 -9 669.90 -48.2 -48.3 -48.3 68 -99 SPO 1997 04 10 01 11 9 9.4 -9 669.90 -48.2 -48.2 -48.2 68 -99 SPO 1997 04 10 01 12 10 9.9 -9 669.90 -48.2 -48.2 -48.2 69 -99 SPO 1997 04 10 01 13 9 10.0 -9 669.80 -48.2 -48.2 -48.2 68 -99 SPO 1997 04 10 01 14 10 9.7 -9 669.80 -48.2 -48.2 -48.2 68 -99 SPO 1997 04 10 01 15 10 9.8 -9 669.90 -48.2 -48.3 -48.2 68 -99 SPO 1997 04 10 01 16 10 9.2 -9 669.80 -48.1 -48.3 -48.3 66 -99 SPO 1997 04 10 01 17 9 8.8 -9 669.80 -48.2 -48.4 -48.3 67 -99 SPO 1997 04 10 01 18 9 9.3 -9 669.80 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 01 19 8 9.3 -9 669.80 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 01 20 7 10.0 -9 669.80 -48.2 -48.4 -48.2 66 -99 SPO 1997 04 10 01 21 6 9.8 -9 669.80 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 10 01 22 5 9.3 -9 669.80 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 10 01 23 4 9.8 -9 669.90 -48.1 -48.2 -48.2 67 -99 SPO 1997 04 10 01 24 6 9.6 -9 669.90 -48.1 -48.2 -48.2 67 -99 SPO 1997 04 10 01 25 5 9.1 -9 669.90 -48.1 -48.2 -48.2 69 -99 SPO 1997 04 10 01 26 6 9.0 -9 669.90 -48.1 -48.2 -48.2 69 -99 SPO 1997 04 10 01 27 4 9.2 -9 669.90 -48.1 -48.2 -48.2 69 -99 SPO 1997 04 10 01 28 5 9.3 -9 669.90 -48.1 -48.2 -48.2 69 -99 SPO 1997 04 10 01 29 4 9.1 -9 669.90 -48.1 -48.2 -48.2 69 -99 SPO 1997 04 10 01 30 3 9.1 -9 669.90 -48.0 -48.2 -48.1 67 -99 SPO 1997 04 10 01 31 4 9.1 -9 669.90 -48.0 -48.2 -48.1 67 -99 SPO 1997 04 10 01 32 5 8.9 -9 669.90 -48.0 -48.2 -48.2 66 -99 SPO 1997 04 10 01 33 5 8.8 -9 670.00 -48.0 -48.1 -48.1 66 -99 SPO 1997 04 10 01 34 6 8.8 -9 669.90 -48.0 -48.1 -48.1 66 -99 SPO 1997 04 10 01 35 6 8.8 -9 669.90 -48.0 -48.2 -48.1 67 -99 SPO 1997 04 10 01 36 6 8.6 -9 669.90 -48.0 -48.2 -48.1 67 -99 SPO 1997 04 10 01 37 6 8.4 -9 669.90 -48.0 -48.2 -48.1 68 -99 SPO 1997 04 10 01 38 6 8.8 -9 669.90 -48.0 -48.2 -48.1 68 -99 SPO 1997 04 10 01 39 5 9.3 -9 669.80 -48.0 -48.1 -48.0 68 -99 SPO 1997 04 10 01 40 4 9.3 -9 669.80 -47.9 -48.1 -48.0 67 -99 SPO 1997 04 10 01 41 3 9.8 -9 669.90 -47.9 -48.0 -47.9 67 -99 SPO 1997 04 10 01 42 2 8.9 -9 669.90 -47.9 -48.0 -47.9 67 -99 SPO 1997 04 10 01 43 5 8.4 -9 669.90 -47.8 -48.0 -47.9 66 -99 SPO 1997 04 10 01 44 7 8.7 -9 669.90 -47.8 -48.0 -47.9 65 -99 SPO 1997 04 10 01 45 8 8.0 -9 669.90 -47.8 -48.0 -47.9 65 -99 SPO 1997 04 10 01 46 9 8.5 -9 669.90 -47.8 -48.0 -48.0 65 -99 SPO 1997 04 10 01 47 7 8.6 -9 669.90 -47.8 -48.0 -48.0 65 -99 SPO 1997 04 10 01 48 5 9.2 -9 669.90 -47.8 -48.0 -48.0 66 -99 SPO 1997 04 10 01 49 3 8.8 -9 669.90 -47.8 -47.9 -47.9 65 -99 SPO 1997 04 10 01 50 1 9.0 -9 669.90 -47.8 -47.9 -47.9 64 -99 SPO 1997 04 10 01 51 2 8.8 -9 669.90 -47.8 -47.8 -47.8 64 -99 SPO 1997 04 10 01 52 4 8.9 -9 669.80 -47.7 -47.8 -47.8 64 -99 SPO 1997 04 10 01 53 5 8.6 -9 669.90 -47.7 -47.8 -47.8 64 -99 SPO 1997 04 10 01 54 7 8.0 -9 669.90 -47.7 -47.8 -47.8 64 -99 SPO 1997 04 10 01 55 6 9.3 -9 669.90 -47.7 -47.9 -47.8 64 -99 SPO 1997 04 10 01 56 4 9.3 -9 669.80 -47.6 -47.8 -47.8 64 -99 SPO 1997 04 10 01 57 2 9.9 -9 669.80 -47.6 -47.8 -47.7 64 -99 SPO 1997 04 10 01 58 3 9.5 -9 669.80 -47.6 -47.8 -47.7 66 -99 SPO 1997 04 10 01 59 2 9.1 -9 669.80 -47.6 -47.8 -47.8 68 -99 SPO 1997 04 10 02 00 3 8.7 -9 669.80 -47.7 -47.9 -47.8 69 0 SPO 1997 04 10 02 01 5 8.0 -9 669.90 -47.7 -47.8 -47.8 70 -99 SPO 1997 04 10 02 02 7 7.4 -9 669.90 -47.7 -47.8 -47.8 70 -99 SPO 1997 04 10 02 03 9 7.4 -9 669.90 -47.7 -47.8 -47.8 70 -99 SPO 1997 04 10 02 04 7 8.6 -9 669.80 -47.7 -47.8 -47.8 69 -99 SPO 1997 04 10 02 05 2 9.2 -9 669.80 -47.7 -47.8 -47.7 69 -99 SPO 1997 04 10 02 06 1 9.5 -9 669.80 -47.7 -47.8 -47.8 69 -99 SPO 1997 04 10 02 07 3 8.9 -9 669.80 -47.7 -47.8 -47.8 67 -99 SPO 1997 04 10 02 08 4 8.8 -9 669.90 -47.7 -47.8 -47.8 67 -99 SPO 1997 04 10 02 09 4 8.7 -9 669.90 -47.7 -47.8 -47.9 67 -99 SPO 1997 04 10 02 10 3 9.4 -9 669.80 -47.7 -47.8 -47.8 67 -99 SPO 1997 04 10 02 11 2 8.6 -9 669.80 -47.8 -47.8 -47.9 67 -99 SPO 1997 04 10 02 12 3 9.1 -9 669.80 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 10 02 13 3 8.7 -9 669.80 -47.8 -47.9 -47.9 67 -99 SPO 1997 04 10 02 14 2 8.5 -9 669.80 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 10 02 15 3 9.0 -9 669.80 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 10 02 16 4 8.5 -9 669.80 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 10 02 17 5 9.2 -9 669.80 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 10 02 18 3 9.2 -9 669.80 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 10 02 19 3 9.7 -9 669.80 -47.8 -48.0 -47.9 67 -99 SPO 1997 04 10 02 20 2 9.7 -9 669.80 -47.8 -48.0 -48.0 67 -99 SPO 1997 04 10 02 21 1 9.4 -9 669.80 -47.9 -48.0 -48.0 68 -99 SPO 1997 04 10 02 22 1 8.9 -9 669.80 -47.9 -48.0 -48.0 67 -99 SPO 1997 04 10 02 23 3 9.6 -9 669.80 -47.9 -48.0 -48.0 67 -99 SPO 1997 04 10 02 24 2 8.9 -9 669.80 -47.9 -48.0 -48.0 67 -99 SPO 1997 04 10 02 25 2 9.2 -9 669.80 -47.9 -48.1 -48.1 67 -99 SPO 1997 04 10 02 26 1 9.5 -9 669.80 -47.9 -48.1 -48.1 67 -99 SPO 1997 04 10 02 27 1 8.8 -9 669.80 -48.0 -48.1 -48.1 67 -99 SPO 1997 04 10 02 28 1 8.2 -9 669.90 -48.0 -48.1 -48.2 67 -99 SPO 1997 04 10 02 29 0 8.3 -9 669.80 -48.0 -48.1 -48.2 67 -99 SPO 1997 04 10 02 30 1 8.8 -9 669.80 -48.1 -48.2 -48.2 66 -99 SPO 1997 04 10 02 31 359 8.7 -9 669.80 -48.1 -48.2 -48.2 66 -99 SPO 1997 04 10 02 32 360 9.8 -9 669.80 -48.1 -48.2 -48.2 66 -99 SPO 1997 04 10 02 33 358 9.4 -9 669.80 -48.1 -48.2 -48.2 66 -99 SPO 1997 04 10 02 34 359 9.2 -9 669.80 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 10 02 35 360 9.3 -9 669.80 -48.1 -48.3 -48.3 66 -99 SPO 1997 04 10 02 36 1 8.9 -9 669.80 -48.1 -48.3 -48.3 66 -99 SPO 1997 04 10 02 37 1 8.8 -9 669.80 -48.2 -48.3 -48.3 67 -99 SPO 1997 04 10 02 38 2 9.1 -9 669.80 -48.2 -48.3 -48.2 67 -99 SPO 1997 04 10 02 39 0 9.0 -9 669.80 -48.2 -48.3 -48.2 67 -99 SPO 1997 04 10 02 40 1 9.0 -9 669.80 -48.2 -48.3 -48.2 67 -99 SPO 1997 04 10 02 41 2 8.6 -9 669.80 -48.2 -48.3 -48.3 67 -99 SPO 1997 04 10 02 42 3 8.6 -9 669.80 -48.2 -48.3 -48.3 66 -99 SPO 1997 04 10 02 43 4 8.4 -9 669.80 -48.2 -48.3 -48.3 66 -99 SPO 1997 04 10 02 44 5 8.7 -9 669.80 -48.2 -48.3 -48.2 66 -99 SPO 1997 04 10 02 45 4 9.4 -9 669.80 -48.1 -48.3 -48.2 65 -99 SPO 1997 04 10 02 46 1 9.7 -9 669.80 -48.1 -48.3 -48.2 64 -99 SPO 1997 04 10 02 47 360 9.3 -9 669.80 -48.1 -48.3 -48.2 65 -99 SPO 1997 04 10 02 48 2 9.2 -9 669.80 -48.1 -48.2 -48.2 66 -99 SPO 1997 04 10 02 49 3 8.6 -9 669.80 -48.2 -48.3 -48.2 66 -99 SPO 1997 04 10 02 50 6 8.3 -9 669.80 -48.2 -48.3 -48.2 66 -99 SPO 1997 04 10 02 51 5 9.1 -9 669.80 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 10 02 52 1 9.4 -9 669.80 -48.1 -48.3 -48.2 66 -99 SPO 1997 04 10 02 53 1 9.8 -9 669.80 -48.1 -48.4 -48.2 66 -99 SPO 1997 04 10 02 54 2 9.4 -9 669.80 -48.1 -48.4 -48.3 66 -99 SPO 1997 04 10 02 55 1 10.2 -9 669.80 -48.2 -48.4 -48.3 67 -99 SPO 1997 04 10 02 56 0 9.7 -9 669.80 -48.1 -48.4 -48.2 66 -99 SPO 1997 04 10 02 57 1 9.4 -9 669.80 -48.1 -48.3 -48.2 65 -99 SPO 1997 04 10 02 58 3 9.0 -9 669.80 -48.1 -48.4 -48.2 65 -99 SPO 1997 04 10 02 59 4 8.3 -9 669.90 -48.2 -48.4 -48.2 66 -99 SPO 1997 04 10 03 00 5 8.6 -9 669.80 -48.2 -48.4 -48.3 66 0 SPO 1997 04 10 03 01 5 9.2 -9 669.80 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 03 02 4 9.4 -9 669.70 -48.1 -48.4 -48.3 66 -99 SPO 1997 04 10 03 03 6 9.9 -9 669.70 -48.1 -48.3 -48.2 67 -99 SPO 1997 04 10 03 04 5 9.7 -9 669.70 -48.1 -48.3 -48.2 67 -99 SPO 1997 04 10 03 05 5 9.7 -9 669.70 -48.1 -48.3 -48.2 68 -99 SPO 1997 04 10 03 06 3 9.8 -9 669.80 -48.2 -48.3 -48.2 69 -99 SPO 1997 04 10 03 07 3 9.6 -9 669.80 -48.2 -48.3 -48.3 68 -99 SPO 1997 04 10 03 08 4 8.9 -9 669.80 -48.2 -48.4 -48.3 68 -99 SPO 1997 04 10 03 09 6 8.8 -9 669.80 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 03 10 7 7.8 -9 669.90 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 03 11 9 7.2 -9 669.90 -48.1 -48.4 -48.2 65 -99 SPO 1997 04 10 03 12 11 6.6 -9 669.90 -48.1 -48.4 -48.2 66 -99 SPO 1997 04 10 03 13 12 7.3 -9 670.00 -48.1 -48.4 -48.2 66 -99 SPO 1997 04 10 03 14 7 8.0 -9 669.90 -48.1 -48.4 -48.2 66 -99 SPO 1997 04 10 03 15 4 9.5 -9 669.80 -48.1 -48.5 -48.2 67 -99 SPO 1997 04 10 03 16 4 9.5 -9 669.80 -48.2 -48.5 -48.3 68 -99 SPO 1997 04 10 03 17 4 9.3 -9 669.80 -48.2 -48.5 -48.3 67 -99 SPO 1997 04 10 03 18 4 8.9 -9 669.90 -48.2 -48.5 -48.4 67 -99 SPO 1997 04 10 03 19 5 8.8 -9 669.90 -48.2 -48.5 -48.4 66 -99 SPO 1997 04 10 03 20 7 8.9 -9 669.90 -48.2 -48.5 -48.4 66 -99 SPO 1997 04 10 03 21 6 8.7 -9 669.90 -48.2 -48.5 -48.3 66 -99 SPO 1997 04 10 03 22 8 8.3 -9 669.90 -48.2 -48.4 -48.3 65 -99 SPO 1997 04 10 03 23 9 8.2 -9 669.90 -48.2 -48.4 -48.3 65 -99 SPO 1997 04 10 03 24 12 7.8 -9 669.90 -48.2 -48.4 -48.3 66 -99 SPO 1997 04 10 03 25 15 7.7 -9 670.00 -48.2 -48.5 -48.3 67 -99 SPO 1997 04 10 03 26 13 8.6 -9 669.90 -48.2 -48.4 -48.3 67 -99 SPO 1997 04 10 03 27 9 8.7 -9 669.90 -48.2 -48.4 -48.3 68 -99 SPO 1997 04 10 03 28 6 9.1 -9 669.90 -48.3 -48.5 -48.4 69 -99 SPO 1997 04 10 03 29 5 9.1 -9 669.90 -48.3 -48.5 -48.4 68 -99 SPO 1997 04 10 03 30 5 9.0 -9 669.90 -48.3 -48.6 -48.4 67 -99 SPO 1997 04 10 03 31 6 8.2 -9 669.90 -48.3 -48.6 -48.4 67 -99 SPO 1997 04 10 03 32 8 8.3 -9 670.00 -48.3 -48.6 -48.4 66 -99 SPO 1997 04 10 03 33 10 7.6 -9 670.00 -48.3 -48.6 -48.4 66 -99 SPO 1997 04 10 03 34 9 8.7 -9 669.90 -48.3 -48.6 -48.4 66 -99 SPO 1997 04 10 03 35 5 9.8 -9 669.90 -48.3 -48.7 -48.5 66 -99 SPO 1997 04 10 03 36 5 9.1 -9 669.90 -48.4 -48.7 -48.6 67 -99 SPO 1997 04 10 03 37 5 8.6 -9 669.90 -48.4 -48.7 -48.6 67 -99 SPO 1997 04 10 03 38 6 8.6 -9 669.90 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 03 39 7 8.3 -9 669.90 -48.5 -48.8 -48.7 67 -99 SPO 1997 04 10 03 40 10 7.7 -9 669.90 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 03 41 12 7.5 -9 669.90 -48.5 -48.8 -48.6 68 -99 SPO 1997 04 10 03 42 15 7.5 -9 669.90 -48.5 -48.8 -48.6 68 -99 SPO 1997 04 10 03 43 20 6.9 -9 670.00 -48.5 -48.7 -48.6 67 -99 SPO 1997 04 10 03 44 19 6.8 -9 669.90 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 03 45 12 8.3 -9 669.90 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 03 46 7 8.3 -9 669.80 -48.5 -48.8 -48.7 66 -99 SPO 1997 04 10 03 47 10 8.6 -9 669.90 -48.5 -48.8 -48.7 65 -99 SPO 1997 04 10 03 48 10 8.6 -9 669.80 -48.6 -48.9 -48.7 66 -99 SPO 1997 04 10 03 49 10 9.1 -9 669.90 -48.6 -48.9 -48.7 66 -99 SPO 1997 04 10 03 50 11 8.4 -9 669.80 -48.6 -48.9 -48.7 66 -99 SPO 1997 04 10 03 51 13 8.0 -9 669.90 -48.6 -48.9 -48.7 67 -99 SPO 1997 04 10 03 52 15 7.2 -9 669.90 -48.6 -48.9 -48.7 67 -99 SPO 1997 04 10 03 53 18 7.2 -9 669.90 -48.6 -48.9 -48.7 68 -99 SPO 1997 04 10 03 54 17 7.0 -9 670.00 -48.6 -48.9 -48.6 68 -99 SPO 1997 04 10 03 55 15 7.7 -9 669.90 -48.6 -48.8 -48.6 67 -99 SPO 1997 04 10 03 56 9 9.0 -9 669.80 -48.6 -48.8 -48.6 67 -99 SPO 1997 04 10 03 57 11 8.7 -9 669.80 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 10 03 58 11 8.9 -9 669.80 -48.6 -48.9 -48.7 66 -99 SPO 1997 04 10 03 59 12 8.3 -9 669.80 -48.6 -48.9 -48.7 66 -99 SPO 1997 04 10 04 00 13 8.6 -9 669.90 -48.6 -48.9 -48.7 66 0 SPO 1997 04 10 04 01 14 7.8 -9 669.80 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 10 04 02 14 9.0 -9 669.80 -48.6 -48.8 -48.6 66 -99 SPO 1997 04 10 04 03 13 8.4 -9 669.80 -48.6 -48.8 -48.6 67 -99 SPO 1997 04 10 04 04 12 8.4 -9 669.90 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 05 11 8.3 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 06 10 8.1 -9 669.90 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 07 11 8.0 -9 669.80 -48.5 -48.8 -48.6 65 -99 SPO 1997 04 10 04 08 8 8.8 -9 669.80 -48.5 -48.8 -48.6 65 -99 SPO 1997 04 10 04 09 9 7.8 -9 669.90 -48.5 -48.8 -48.6 65 -99 SPO 1997 04 10 04 10 10 7.6 -9 669.90 -48.5 -48.8 -48.6 65 -99 SPO 1997 04 10 04 11 11 8.0 -9 669.90 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 12 10 7.9 -9 669.90 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 13 10 6.8 -9 669.90 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 04 14 8 7.5 -9 669.90 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 04 15 8 8.2 -9 669.80 -48.5 -48.8 -48.6 68 -99 SPO 1997 04 10 04 16 7 7.8 -9 669.80 -48.5 -48.8 -48.6 68 -99 SPO 1997 04 10 04 17 9 8.9 -9 669.80 -48.5 -48.8 -48.7 67 -99 SPO 1997 04 10 04 18 8 8.1 -9 669.80 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 04 19 8 8.3 -9 669.80 -48.5 -48.7 -48.6 67 -99 SPO 1997 04 10 04 20 8 8.8 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 21 8 9.0 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 22 9 8.7 -9 669.80 -48.5 -48.7 -48.6 65 -99 SPO 1997 04 10 04 23 6 8.3 -9 669.80 -48.5 -48.8 -48.6 63 -99 SPO 1997 04 10 04 24 6 8.5 -9 669.80 -48.5 -48.7 -48.6 63 -99 SPO 1997 04 10 04 25 8 8.4 -9 669.80 -48.5 -48.7 -48.6 65 -99 SPO 1997 04 10 04 26 8 7.9 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 27 6 8.1 -9 669.80 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 28 3 8.5 -9 669.80 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 04 29 6 8.9 -9 669.80 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 04 30 5 8.6 -9 669.70 -48.5 -48.8 -48.6 68 -99 SPO 1997 04 10 04 31 5 9.2 -9 669.70 -48.5 -48.8 -48.6 67 -99 SPO 1997 04 10 04 32 4 8.6 -9 669.80 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 33 5 8.5 -9 669.80 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 34 6 8.1 -9 669.80 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 10 04 35 9 7.6 -9 669.80 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 10 04 36 10 7.7 -9 669.80 -48.6 -48.8 -48.7 66 -99 SPO 1997 04 10 04 37 10 7.9 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 38 7 9.0 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 39 3 9.6 -9 669.70 -48.5 -48.7 -48.6 67 -99 SPO 1997 04 10 04 40 3 9.8 -9 669.70 -48.5 -48.7 -48.6 67 -99 SPO 1997 04 10 04 41 5 9.3 -9 669.80 -48.6 -48.7 -48.6 68 -99 SPO 1997 04 10 04 42 5 8.9 -9 669.80 -48.5 -48.7 -48.7 67 -99 SPO 1997 04 10 04 43 6 8.5 -9 669.80 -48.5 -48.7 -48.6 67 -99 SPO 1997 04 10 04 44 6 8.8 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 45 3 9.8 -9 669.80 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 46 1 10.7 -9 669.70 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 47 359 9.7 -9 669.70 -48.5 -48.7 -48.6 66 -99 SPO 1997 04 10 04 48 2 9.1 -9 669.80 -48.5 -48.8 -48.6 66 -99 SPO 1997 04 10 04 49 4 9.2 -9 669.80 -48.6 -48.8 -48.7 67 -99 SPO 1997 04 10 04 50 6 9.1 -9 669.80 -48.6 -48.8 -48.7 67 -99 SPO 1997 04 10 04 51 7 9.6 -9 669.80 -48.6 -48.8 -48.7 67 -99 SPO 1997 04 10 04 52 4 9.8 -9 669.80 -48.6 -48.9 -48.8 67 -99 SPO 1997 04 10 04 53 2 9.5 -9 669.80 -48.7 -48.9 -48.9 68 -99 SPO 1997 04 10 04 54 0 10.0 -9 669.80 -48.7 -48.9 -48.9 67 -99 SPO 1997 04 10 04 55 1 9.3 -9 669.80 -48.7 -48.9 -48.9 67 -99 SPO 1997 04 10 04 56 2 8.8 -9 669.80 -48.8 -48.9 -48.9 67 -99 SPO 1997 04 10 04 57 3 8.8 -9 669.80 -48.8 -48.9 -48.9 67 -99 SPO 1997 04 10 04 58 5 8.3 -9 669.80 -48.8 -48.9 -48.9 66 -99 SPO 1997 04 10 04 59 8 8.9 -9 669.80 -48.8 -48.8 -48.8 66 -99 SPO 1997 04 10 05 00 8 10.0 -9 669.80 -48.7 -48.8 -48.7 65 0 SPO 1997 04 10 05 01 4 10.6 -9 669.80 -48.6 -48.8 -48.8 66 -99 SPO 1997 04 10 05 02 3 9.4 -9 669.80 -48.7 -48.8 -48.8 67 -99 SPO 1997 04 10 05 03 2 9.7 -9 669.80 -48.7 -48.9 -48.9 67 -99 SPO 1997 04 10 05 04 2 9.3 -9 669.80 -48.8 -49.0 -48.9 68 -99 SPO 1997 04 10 05 05 1 9.6 -9 669.80 -48.8 -49.0 -48.9 68 -99 SPO 1997 04 10 05 06 1 9.6 -9 669.70 -48.8 -49.0 -48.9 68 -99 SPO 1997 04 10 05 07 360 9.3 -9 669.70 -48.8 -49.0 -48.9 67 -99 SPO 1997 04 10 05 08 360 9.1 -9 669.70 -48.8 -49.0 -48.9 66 -99 SPO 1997 04 10 05 09 360 9.4 -9 669.70 -48.8 -49.0 -48.9 66 -99 SPO 1997 04 10 05 10 1 9.1 -9 669.70 -48.8 -49.0 -48.9 65 -99 SPO 1997 04 10 05 11 3 8.5 -9 669.80 -48.8 -49.0 -48.9 65 -99 SPO 1997 04 10 05 12 4 8.5 -9 669.80 -48.8 -48.9 -48.9 66 -99 SPO 1997 04 10 05 13 1 9.4 -9 669.80 -48.8 -48.9 -48.8 67 -99 SPO 1997 04 10 05 14 2 9.5 -9 669.80 -48.8 -48.8 -48.8 68 -99 SPO 1997 04 10 05 15 3 9.2 -9 669.70 -48.7 -48.8 -48.8 67 -99 SPO 1997 04 10 05 16 5 9.5 -9 669.80 -48.7 -48.8 -48.8 67 -99 SPO 1997 04 10 05 17 5 8.9 -9 669.80 -48.7 -48.8 -48.8 68 -99 SPO 1997 04 10 05 18 1 10.9 -9 669.70 -48.8 -48.8 -48.8 69 -99 SPO 1997 04 10 05 19 360 10.4 -9 669.70 -48.7 -48.9 -48.9 67 -99 SPO 1997 04 10 05 20 360 10.0 -9 669.70 -48.8 -48.9 -48.9 67 -99 SPO 1997 04 10 05 21 1 9.2 -9 669.70 -48.8 -48.9 -49.0 66 -99 SPO 1997 04 10 05 22 2 9.0 -9 669.70 -48.8 -49.0 -49.0 65 -99 SPO 1997 04 10 05 23 2 8.5 -9 669.70 -48.9 -49.0 -49.0 66 -99 SPO 1997 04 10 05 24 4 8.2 -9 669.80 -48.9 -49.1 -49.0 66 -99 SPO 1997 04 10 05 25 8 8.0 -9 669.80 -48.9 -49.0 -49.0 66 -99 SPO 1997 04 10 05 26 6 8.4 -9 669.80 -48.9 -49.0 -48.9 68 -99 SPO 1997 04 10 05 27 3 9.3 -9 669.70 -48.8 -49.0 -48.9 67 -99 SPO 1997 04 10 05 28 359 9.3 -9 669.70 -48.9 -49.1 -49.0 69 -99 SPO 1997 04 10 05 29 0 9.7 -9 669.70 -48.9 -49.1 -49.0 69 -99 SPO 1997 04 10 05 30 2 9.3 -9 669.70 -48.9 -49.1 -49.1 69 -99 SPO 1997 04 10 05 31 3 9.0 -9 669.70 -49.0 -49.1 -49.1 69 -99 SPO 1997 04 10 05 32 4 8.2 -9 669.70 -49.0 -49.1 -49.1 67 -99 SPO 1997 04 10 05 33 5 8.3 -9 669.70 -49.0 -49.1 -49.1 66 -99 SPO 1997 04 10 05 34 6 8.6 -9 669.70 -49.0 -49.1 -49.1 65 -99 SPO 1997 04 10 05 35 2 9.5 -9 669.70 -49.0 -49.1 -49.0 65 -99 SPO 1997 04 10 05 36 2 9.8 -9 669.70 -49.0 -49.0 -49.0 65 -99 SPO 1997 04 10 05 37 1 9.2 -9 669.70 -48.9 -49.1 -49.0 66 -99 SPO 1997 04 10 05 38 1 8.9 -9 669.70 -48.9 -49.0 -49.1 66 -99 SPO 1997 04 10 05 39 360 9.3 -9 669.70 -48.9 -49.0 -49.0 66 -99 SPO 1997 04 10 05 40 1 9.0 -9 669.70 -48.9 -49.0 -49.0 66 -99 SPO 1997 04 10 05 41 1 8.7 -9 669.70 -49.0 -49.1 -49.1 67 -99 SPO 1997 04 10 05 42 3 8.5 -9 669.70 -49.0 -49.2 -49.2 67 -99 SPO 1997 04 10 05 43 5 8.3 -9 669.70 -49.0 -49.2 -49.2 66 -99 SPO 1997 04 10 05 44 7 8.4 -9 669.70 -49.1 -49.3 -49.2 66 -99 SPO 1997 04 10 05 45 3 9.7 -9 669.70 -49.1 -49.2 -49.2 66 -99 SPO 1997 04 10 05 46 0 10.2 -9 669.60 -49.1 -49.2 -49.2 66 -99 SPO 1997 04 10 05 47 360 9.9 -9 669.70 -49.1 -49.3 -49.3 65 -99 SPO 1997 04 10 05 48 360 9.7 -9 669.70 -49.2 -49.3 -49.3 66 -99 SPO 1997 04 10 05 49 0 9.2 -9 669.70 -49.2 -49.3 -49.4 67 -99 SPO 1997 04 10 05 50 360 8.6 -9 669.70 -49.2 -49.3 -49.4 66 -99 SPO 1997 04 10 05 51 1 8.4 -9 669.80 -49.3 -49.3 -49.4 67 -99 SPO 1997 04 10 05 52 2 8.0 -9 669.80 -49.3 -49.3 -49.4 67 -99 SPO 1997 04 10 05 53 6 8.0 -9 669.80 -49.3 -49.4 -49.4 67 -99 SPO 1997 04 10 05 54 6 7.5 -9 669.80 -49.2 -49.4 -49.4 66 -99 SPO 1997 04 10 05 55 8 7.0 -9 669.80 -49.2 -49.3 -49.4 65 -99 SPO 1997 04 10 05 56 10 6.8 -9 669.80 -49.3 -49.3 -49.4 65 -99 SPO 1997 04 10 05 57 6 8.8 -9 669.80 -49.3 -49.3 -49.3 65 -99 SPO 1997 04 10 05 58 3 8.8 -9 669.80 -49.2 -49.3 -49.3 64 -99 SPO 1997 04 10 05 59 3 8.3 -9 669.80 -49.2 -49.4 -49.4 64 -99 SPO 1997 04 10 06 00 1 9.0 -9 669.70 -49.3 -49.5 -49.4 65 0 SPO 1997 04 10 06 01 2 8.5 -9 669.80 -49.3 -49.5 -49.5 66 -99 SPO 1997 04 10 06 02 4 8.1 -9 669.80 -49.3 -49.5 -49.5 66 -99 SPO 1997 04 10 06 03 4 9.0 -9 669.80 -49.4 -49.5 -49.4 67 -99 SPO 1997 04 10 06 04 3 9.3 -9 669.80 -49.3 -49.5 -49.4 66 -99 SPO 1997 04 10 06 05 1 8.8 -9 669.70 -49.4 -49.5 -49.4 67 -99 SPO 1997 04 10 06 06 0 8.5 -9 669.80 -49.4 -49.6 -49.6 67 -99 SPO 1997 04 10 06 07 1 8.7 -9 669.80 -49.4 -49.6 -49.6 66 -99 SPO 1997 04 10 06 08 0 8.4 -9 669.80 -49.5 -49.6 -49.7 66 -99 SPO 1997 04 10 06 09 2 8.3 -9 669.80 -49.5 -49.6 -49.6 65 -99 SPO 1997 04 10 06 10 3 8.7 -9 669.80 -49.6 -49.6 -49.6 65 -99 SPO 1997 04 10 06 11 2 9.7 -9 669.70 -49.5 -49.5 -49.5 65 -99 SPO 1997 04 10 06 12 360 9.4 -9 669.70 -49.4 -49.5 -49.5 65 -99 SPO 1997 04 10 06 13 0 9.4 -9 669.80 -49.4 -49.5 -49.6 65 -99 SPO 1997 04 10 06 14 1 9.7 -9 669.80 -49.5 -49.6 -49.6 67 -99 SPO 1997 04 10 06 15 0 8.8 -9 669.80 -49.5 -49.6 -49.6 67 -99 SPO 1997 04 10 06 16 1 8.3 -9 669.80 -49.5 -49.6 -49.7 67 -99 SPO 1997 04 10 06 17 2 8.7 -9 669.80 -49.5 -49.6 -49.7 66 -99 SPO 1997 04 10 06 18 1 8.5 -9 669.80 -49.5 -49.6 -49.7 65 -99 SPO 1997 04 10 06 19 0 8.0 -9 669.80 -49.6 -49.7 -49.6 66 -99 SPO 1997 04 10 06 20 360 8.8 -9 669.80 -49.6 -49.7 -49.7 65 -99 SPO 1997 04 10 06 21 3 8.5 -9 669.80 -49.6 -49.7 -49.7 65 -99 SPO 1997 04 10 06 22 3 7.9 -9 669.80 -49.6 -49.8 -49.7 65 -99 SPO 1997 04 10 06 23 5 8.1 -9 669.80 -49.6 -49.8 -49.7 64 -99 SPO 1997 04 10 06 24 5 8.4 -9 669.80 -49.6 -49.8 -49.8 65 -99 SPO 1997 04 10 06 25 2 9.2 -9 669.80 -49.7 -49.8 -49.8 65 -99 SPO 1997 04 10 06 26 358 9.3 -9 669.80 -49.7 -49.8 -49.8 65 -99 SPO 1997 04 10 06 27 359 9.3 -9 669.80 -49.7 -49.8 -49.8 65 -99 SPO 1997 04 10 06 28 359 8.9 -9 669.80 -49.8 -49.8 -49.8 67 -99 SPO 1997 04 10 06 29 0 8.7 -9 669.80 -49.6 -49.8 -49.8 65 -99 SPO 1997 04 10 06 30 0 8.5 -9 669.80 -49.7 -49.8 -49.9 66 -99 SPO 1997 04 10 06 31 0 8.5 -9 669.80 -49.7 -49.8 -49.9 66 -99 SPO 1997 04 10 06 32 1 8.5 -9 669.80 -49.8 -49.8 -49.9 66 -99 SPO 1997 04 10 06 33 2 8.5 -9 669.90 -49.8 -49.8 -49.9 65 -99 SPO 1997 04 10 06 34 3 8.2 -9 669.90 -49.8 -49.8 -49.9 65 -99 SPO 1997 04 10 06 35 4 7.5 -9 669.90 -49.8 -49.8 -49.9 64 -99 SPO 1997 04 10 06 36 6 7.6 -9 669.90 -49.8 -49.8 -49.9 64 -99 SPO 1997 04 10 06 37 3 8.4 -9 669.90 -49.7 -49.8 -49.8 63 -99 SPO 1997 04 10 06 38 3 8.4 -9 669.90 -49.8 -49.8 -49.8 65 -99 SPO 1997 04 10 06 39 2 7.8 -9 670.00 -49.7 -49.9 -49.8 64 -99 SPO 1997 04 10 06 40 1 7.6 -9 669.90 -49.8 -49.9 -49.9 65 -99 SPO 1997 04 10 06 41 3 7.1 -9 670.00 -49.8 -50.0 -49.9 65 -99 SPO 1997 04 10 06 42 4 7.0 -9 670.00 -49.8 -50.0 -50.0 65 -99 SPO 1997 04 10 06 43 5 6.6 -9 670.00 -49.9 -50.0 -50.0 66 -99 SPO 1997 04 10 06 44 2 7.2 -9 669.90 -49.9 -50.0 -50.0 65 -99 SPO 1997 04 10 06 45 358 8.1 -9 669.90 -49.9 -50.0 -49.9 65 -99 SPO 1997 04 10 06 46 358 8.5 -9 669.80 -49.9 -50.0 -50.0 64 -99 SPO 1997 04 10 06 47 359 8.8 -9 669.80 -49.8 -49.9 -50.0 63 -99 SPO 1997 04 10 06 48 359 8.3 -9 669.80 -49.9 -50.0 -50.0 65 -99 SPO 1997 04 10 06 49 359 8.0 -9 669.90 -49.9 -50.0 -50.1 65 -99 SPO 1997 04 10 06 50 359 7.9 -9 669.90 -50.0 -50.0 -50.1 64 -99 SPO 1997 04 10 06 51 360 7.5 -9 669.90 -50.0 -50.1 -50.2 64 -99 SPO 1997 04 10 06 52 1 7.0 -9 670.00 -50.0 -50.1 -50.2 64 -99 SPO 1997 04 10 06 53 3 6.9 -9 670.00 -50.1 -50.1 -50.2 64 -99 SPO 1997 04 10 06 54 3 7.3 -9 670.00 -50.1 -50.1 -50.2 64 -99 SPO 1997 04 10 06 55 2 7.6 -9 670.00 -50.1 -50.1 -50.1 64 -99 SPO 1997 04 10 06 56 2 7.9 -9 670.00 -50.0 -50.1 -50.1 63 -99 SPO 1997 04 10 06 57 1 7.7 -9 670.00 -50.1 -50.1 -50.1 64 -99 SPO 1997 04 10 06 58 2 8.1 -9 670.00 -50.1 -50.2 -50.1 63 -99 SPO 1997 04 10 06 59 2 7.4 -9 670.00 -50.1 -50.2 -50.2 63 -99 SPO 1997 04 10 07 00 3 7.6 -9 670.00 -50.1 -50.2 -50.2 64 0 SPO 1997 04 10 07 01 3 7.9 -9 670.00 -50.1 -50.2 -50.2 64 -99 SPO 1997 04 10 07 02 2 8.2 -9 670.00 -50.1 -50.2 -50.2 64 -99 SPO 1997 04 10 07 03 2 8.5 -9 670.00 -50.2 -50.2 -50.2 65 -99 SPO 1997 04 10 07 04 2 8.2 -9 670.00 -50.1 -50.2 -50.2 64 -99 SPO 1997 04 10 07 05 2 8.1 -9 670.00 -50.1 -50.2 -50.3 65 -99 SPO 1997 04 10 07 06 2 8.1 -9 670.00 -50.2 -50.2 -50.3 65 -99 SPO 1997 04 10 07 07 3 8.2 -9 670.00 -50.2 -50.2 -50.3 65 -99 SPO 1997 04 10 07 08 3 7.9 -9 670.00 -50.2 -50.2 -50.3 64 -99 SPO 1997 04 10 07 09 5 8.2 -9 670.00 -50.2 -50.2 -50.3 64 -99 SPO 1997 04 10 07 10 5 7.8 -9 670.00 -50.2 -50.2 -50.3 64 -99 SPO 1997 04 10 07 11 5 7.4 -9 670.00 -50.2 -50.2 -50.3 64 -99 SPO 1997 04 10 07 12 6 7.7 -9 670.00 -50.2 -50.2 -50.4 64 -99 SPO 1997 04 10 07 13 7 7.7 -9 670.00 -50.2 -50.2 -50.4 64 -99 SPO 1997 04 10 07 14 8 7.6 -9 670.00 -50.3 -50.3 -50.4 65 -99 SPO 1997 04 10 07 15 10 8.0 -9 670.00 -50.2 -50.4 -50.4 65 -99 SPO 1997 04 10 07 16 10 7.7 -9 670.00 -50.3 -50.4 -50.4 66 -99 SPO 1997 04 10 07 17 11 7.6 -9 670.00 -50.3 -50.4 -50.4 66 -99 SPO 1997 04 10 07 18 11 7.5 -9 670.00 -50.3 -50.4 -50.4 65 -99 SPO 1997 04 10 07 19 9 7.7 -9 670.00 -50.4 -50.4 -50.4 66 -99 SPO 1997 04 10 07 20 9 7.2 -9 670.00 -50.4 -50.4 -50.4 65 -99 SPO 1997 04 10 07 21 8 7.8 -9 670.00 -50.3 -50.4 -50.4 64 -99 SPO 1997 04 10 07 22 6 7.8 -9 669.90 -50.2 -50.3 -50.4 63 -99 SPO 1997 04 10 07 23 5 8.1 -9 669.90 -50.3 -50.3 -50.4 64 -99 SPO 1997 04 10 07 24 5 7.8 -9 669.90 -50.3 -50.3 -50.4 64 -99 SPO 1997 04 10 07 25 6 8.2 -9 669.90 -50.3 -50.3 -50.4 66 -99 SPO 1997 04 10 07 26 6 8.1 -9 669.90 -50.3 -50.3 -50.4 66 -99 SPO 1997 04 10 07 27 6 8.0 -9 670.00 -50.3 -50.3 -50.4 65 -99 SPO 1997 04 10 07 28 7 8.0 -9 670.00 -50.3 -50.3 -50.5 65 -99 SPO 1997 04 10 07 29 6 7.7 -9 670.00 -50.4 -50.3 -50.5 65 -99 SPO 1997 04 10 07 30 6 7.6 -9 670.00 -50.4 -50.3 -50.5 65 -99 SPO 1997 04 10 07 31 7 7.5 -9 670.00 -50.4 -50.3 -50.5 64 -99 SPO 1997 04 10 07 32 8 7.4 -9 670.00 -50.4 -50.4 -50.5 64 -99 SPO 1997 04 10 07 33 10 7.4 -9 670.00 -50.3 -50.4 -50.5 64 -99 SPO 1997 04 10 07 34 10 7.0 -9 670.10 -50.4 -50.5 -50.5 64 -99 SPO 1997 04 10 07 35 11 7.0 -9 670.10 -50.4 -50.5 -50.5 64 -99 SPO 1997 04 10 07 36 11 6.7 -9 670.10 -50.4 -50.5 -50.5 64 -99 SPO 1997 04 10 07 37 12 6.7 -9 670.10 -50.4 -50.5 -50.5 65 -99 SPO 1997 04 10 07 38 10 6.1 -9 670.10 -50.5 -50.5 -50.6 66 -99 SPO 1997 04 10 07 39 10 6.8 -9 670.10 -50.4 -50.5 -50.6 65 -99 SPO 1997 04 10 07 40 8 7.1 -9 670.10 -50.4 -50.5 -50.6 65 -99 SPO 1997 04 10 07 41 7 7.5 -9 670.00 -50.4 -50.5 -50.5 65 -99 SPO 1997 04 10 07 42 8 7.4 -9 670.00 -50.4 -50.5 -50.6 64 -99 SPO 1997 04 10 07 43 9 7.7 -9 670.00 -50.5 -50.5 -50.6 65 -99 SPO 1997 04 10 07 44 9 7.8 -9 670.00 -50.5 -50.4 -50.5 64 -99 SPO 1997 04 10 07 45 11 7.6 -9 670.00 -50.5 -50.5 -50.6 64 -99 SPO 1997 04 10 07 46 11 7.3 -9 670.00 -50.5 -50.5 -50.6 64 -99 SPO 1997 04 10 07 47 12 7.2 -9 670.00 -50.5 -50.5 -50.6 64 -99 SPO 1997 04 10 07 48 12 6.6 -9 670.10 -50.6 -50.6 -50.7 65 -99 SPO 1997 04 10 07 49 12 6.7 -9 670.10 -50.6 -50.6 -50.7 65 -99 SPO 1997 04 10 07 50 10 7.2 -9 670.00 -50.6 -50.6 -50.7 65 -99 SPO 1997 04 10 07 51 8 7.8 -9 670.00 -50.6 -50.6 -50.7 65 -99 SPO 1997 04 10 07 52 8 7.7 -9 670.00 -50.6 -50.7 -50.7 65 -99 SPO 1997 04 10 07 53 8 7.9 -9 670.00 -50.6 -50.7 -50.7 64 -99 SPO 1997 04 10 07 54 10 7.6 -9 670.00 -50.7 -50.8 -50.8 65 -99 SPO 1997 04 10 07 55 10 7.2 -9 669.90 -50.7 -50.8 -50.8 64 -99 SPO 1997 04 10 07 56 11 7.3 -9 670.00 -50.7 -50.8 -50.9 64 -99 SPO 1997 04 10 07 57 13 6.8 -9 670.00 -50.7 -50.8 -50.9 63 -99 SPO 1997 04 10 07 58 17 6.6 -9 670.00 -50.8 -50.8 -50.9 64 -99 SPO 1997 04 10 07 59 18 6.1 -9 670.10 -50.8 -50.9 -50.9 63 -99 SPO 1997 04 10 08 00 15 6.5 -9 670.10 -50.8 -50.8 -50.9 64 0 SPO 1997 04 10 08 01 11 7.1 -9 670.00 -50.8 -50.8 -50.9 64 -99 SPO 1997 04 10 08 02 10 7.1 -9 670.00 -50.8 -50.8 -50.9 64 -99 SPO 1997 04 10 08 03 11 7.2 -9 670.00 -50.8 -50.8 -50.9 64 -99 SPO 1997 04 10 08 04 10 7.1 -9 670.00 -50.8 -50.8 -50.9 64 -99 SPO 1997 04 10 08 05 11 6.9 -9 670.00 -50.9 -50.8 -51.0 66 -99 SPO 1997 04 10 08 06 12 6.9 -9 670.00 -50.9 -50.8 -51.0 65 -99 SPO 1997 04 10 08 07 14 7.0 -9 670.10 -50.9 -50.8 -51.0 64 -99 SPO 1997 04 10 08 08 16 6.3 -9 670.10 -50.9 -50.9 -51.0 63 -99 SPO 1997 04 10 08 09 18 6.1 -9 670.10 -50.9 -51.0 -51.1 63 -99 SPO 1997 04 10 08 10 19 6.1 -9 670.20 -51.0 -51.1 -51.1 63 -99 SPO 1997 04 10 08 11 20 5.5 -9 670.20 -51.0 -51.1 -51.2 63 -99 SPO 1997 04 10 08 12 22 5.3 -9 670.20 -51.0 -51.1 -51.2 63 -99 SPO 1997 04 10 08 13 19 5.9 -9 670.20 -51.1 -51.1 -51.2 65 -99 SPO 1997 04 10 08 14 14 6.4 -9 670.20 -51.1 -51.0 -51.1 65 -99 SPO 1997 04 10 08 15 14 6.6 -9 670.10 -51.1 -51.0 -51.2 65 -99 SPO 1997 04 10 08 16 14 6.8 -9 670.10 -51.1 -51.1 -51.2 65 -99 SPO 1997 04 10 08 17 15 6.6 -9 670.10 -51.1 -51.1 -51.2 64 -99 SPO 1997 04 10 08 18 15 6.4 -9 670.20 -51.2 -51.1 -51.3 65 -99 SPO 1997 04 10 08 19 18 6.2 -9 670.20 -51.2 -51.1 -51.4 63 -99 SPO 1997 04 10 08 20 20 6.2 -9 670.20 -51.2 -51.1 -51.4 63 -99 SPO 1997 04 10 08 21 20 6.0 -9 670.20 -51.2 -51.2 -51.4 63 -99 SPO 1997 04 10 08 22 20 6.0 -9 670.30 -51.3 -51.2 -51.4 63 -99 SPO 1997 04 10 08 23 20 5.9 -9 670.30 -51.3 -51.2 -51.4 63 -99 SPO 1997 04 10 08 24 21 5.8 -9 670.30 -51.3 -51.2 -51.4 63 -99 SPO 1997 04 10 08 25 20 5.5 -9 670.30 -51.3 -51.2 -51.5 63 -99 SPO 1997 04 10 08 26 20 5.7 -9 670.30 -51.4 -51.2 -51.5 64 -99 SPO 1997 04 10 08 27 21 5.8 -9 670.30 -51.4 -51.3 -51.5 64 -99 SPO 1997 04 10 08 28 20 5.9 -9 670.30 -51.4 -51.3 -51.5 63 -99 SPO 1997 04 10 08 29 20 5.9 -9 670.30 -51.4 -51.4 -51.6 64 -99 SPO 1997 04 10 08 30 20 5.9 -9 670.20 -51.5 -51.4 -51.6 64 -99 SPO 1997 04 10 08 31 19 5.7 -9 670.20 -51.5 -51.4 -51.6 63 -99 SPO 1997 04 10 08 32 19 5.9 -9 670.20 -51.6 -51.4 -51.7 63 -99 SPO 1997 04 10 08 33 17 6.0 -9 670.20 -51.6 -51.4 -51.6 63 -99 SPO 1997 04 10 08 34 16 6.5 -9 670.20 -51.6 -51.4 -51.6 63 -99 SPO 1997 04 10 08 35 17 6.2 -9 670.20 -51.6 -51.4 -51.7 62 -99 SPO 1997 04 10 08 36 16 6.3 -9 670.20 -51.6 -51.4 -51.7 63 -99 SPO 1997 04 10 08 37 17 6.1 -9 670.20 -51.6 -51.4 -51.8 63 -99 SPO 1997 04 10 08 38 17 5.8 -9 670.20 -51.7 -51.5 -51.8 63 -99 SPO 1997 04 10 08 39 16 6.1 -9 670.20 -51.7 -51.5 -51.9 63 -99 SPO 1997 04 10 08 40 15 5.9 -9 670.20 -51.8 -51.4 -51.8 63 -99 SPO 1997 04 10 08 41 14 6.5 -9 670.20 -51.8 -51.4 -51.8 64 -99 SPO 1997 04 10 08 42 13 6.8 -9 670.20 -51.7 -51.4 -51.7 63 -99 SPO 1997 04 10 08 43 13 7.0 -9 670.20 -51.7 -51.4 -51.8 63 -99 SPO 1997 04 10 08 44 13 6.5 -9 670.20 -51.7 -51.5 -51.8 63 -99 SPO 1997 04 10 08 45 12 6.5 -9 670.10 -51.7 -51.6 -51.9 63 -99 SPO 1997 04 10 08 46 10 6.5 -9 670.10 -51.8 -51.6 -51.9 63 -99 SPO 1997 04 10 08 47 10 6.8 -9 670.10 -51.8 -51.6 -51.9 63 -99 SPO 1997 04 10 08 48 9 6.8 -9 670.10 -51.8 -51.6 -51.9 63 -99 SPO 1997 04 10 08 49 10 7.3 -9 670.10 -51.8 -51.6 -51.9 63 -99 SPO 1997 04 10 08 50 9 7.4 -9 670.10 -51.8 -51.5 -51.8 63 -99 SPO 1997 04 10 08 51 9 7.4 -9 670.10 -51.9 -51.6 -51.9 64 -99 SPO 1997 04 10 08 52 8 7.0 -9 670.10 -51.9 -51.6 -52.0 64 -99 SPO 1997 04 10 08 53 9 7.3 -9 670.10 -51.9 -51.6 -52.0 64 -99 SPO 1997 04 10 08 54 8 7.0 -9 670.10 -51.9 -51.6 -52.0 64 -99 SPO 1997 04 10 08 55 8 7.3 -9 670.10 -51.9 -51.6 -52.0 63 -99 SPO 1997 04 10 08 56 9 7.4 -9 670.00 -51.9 -51.6 -52.0 63 -99 SPO 1997 04 10 08 57 9 7.3 -9 670.10 -51.9 -51.6 -52.0 63 -99 SPO 1997 04 10 08 58 9 7.2 -9 670.10 -51.9 -51.6 -52.0 63 -99 SPO 1997 04 10 08 59 9 6.8 -9 670.10 -51.9 -51.6 -52.0 63 -99 SPO 1997 04 10 09 00 10 6.5 -9 670.10 -51.9 -51.7 -52.0 62 0 SPO 1997 04 10 09 01 12 6.4 -9 670.10 -52.0 -51.7 -52.1 63 -99 SPO 1997 04 10 09 02 12 6.0 -9 670.10 -52.0 -51.8 -52.2 63 -99 SPO 1997 04 10 09 03 11 6.0 -9 670.10 -52.0 -51.8 -52.2 63 -99 SPO 1997 04 10 09 04 12 5.9 -9 670.20 -52.1 -51.9 -52.2 64 -99 SPO 1997 04 10 09 05 13 6.0 -9 670.20 -52.1 -51.9 -52.2 64 -99 SPO 1997 04 10 09 06 12 6.0 -9 670.10 -52.1 -51.9 -52.3 63 -99 SPO 1997 04 10 09 07 12 6.3 -9 670.10 -52.1 -51.9 -52.2 63 -99 SPO 1997 04 10 09 08 11 6.7 -9 670.10 -52.1 -51.8 -52.1 63 -99 SPO 1997 04 10 09 09 10 6.7 -9 670.10 -52.1 -51.8 -52.1 63 -99 SPO 1997 04 10 09 10 11 7.0 -9 670.10 -52.0 -51.8 -52.1 62 -99 SPO 1997 04 10 09 11 10 7.3 -9 670.10 -52.0 -51.8 -52.0 63 -99 SPO 1997 04 10 09 12 10 7.5 -9 670.10 -52.0 -51.8 -52.0 64 -99 SPO 1997 04 10 09 13 10 7.5 -9 670.10 -52.0 -51.8 -52.0 64 -99 SPO 1997 04 10 09 14 11 7.3 -9 670.10 -52.0 -51.7 -52.1 64 -99 SPO 1997 04 10 09 15 12 7.2 -9 670.10 -52.0 -51.8 -52.1 64 -99 SPO 1997 04 10 09 16 13 7.1 -9 670.10 -52.0 -51.8 -52.2 64 -99 SPO 1997 04 10 09 17 14 6.8 -9 670.10 -52.0 -51.8 -52.2 63 -99 SPO 1997 04 10 09 18 15 6.9 -9 670.10 -52.1 -51.8 -52.3 63 -99 SPO 1997 04 10 09 19 16 6.9 -9 670.10 -52.1 -51.8 -52.3 62 -99 SPO 1997 04 10 09 20 15 7.4 -9 670.10 -52.2 -51.8 -52.2 62 -99 SPO 1997 04 10 09 21 12 7.8 -9 670.10 -52.1 -51.8 -52.2 62 -99 SPO 1997 04 10 09 22 13 7.7 -9 670.10 -52.1 -51.8 -52.1 62 -99 SPO 1997 04 10 09 23 12 7.6 -9 670.10 -52.1 -51.8 -52.1 63 -99 SPO 1997 04 10 09 24 13 7.7 -9 670.10 -52.1 -51.8 -52.1 63 -99 SPO 1997 04 10 09 25 13 7.5 -9 670.10 -52.1 -51.9 -52.2 63 -99 SPO 1997 04 10 09 26 15 7.2 -9 670.10 -52.1 -51.9 -52.3 63 -99 SPO 1997 04 10 09 27 16 7.0 -9 670.20 -52.2 -51.9 -52.4 64 -99 SPO 1997 04 10 09 28 17 6.8 -9 670.20 -52.2 -51.9 -52.4 63 -99 SPO 1997 04 10 09 29 17 6.6 -9 670.20 -52.2 -52.0 -52.4 63 -99 SPO 1997 04 10 09 30 17 6.3 -9 670.20 -52.3 -52.0 -52.5 63 -99 SPO 1997 04 10 09 31 18 6.1 -9 670.20 -52.4 -52.0 -52.5 63 -99 SPO 1997 04 10 09 32 20 5.9 -9 670.20 -52.4 -52.0 -52.6 62 -99 SPO 1997 04 10 09 33 20 5.7 -9 670.30 -52.5 -52.0 -52.6 62 -99 SPO 1997 04 10 09 34 21 6.0 -9 670.30 -52.5 -52.0 -52.5 62 -99 SPO 1997 04 10 09 35 21 5.9 -9 670.30 -52.5 -52.0 -52.5 62 -99 SPO 1997 04 10 09 36 23 5.6 -9 670.40 -52.4 -52.1 -52.5 62 -99 SPO 1997 04 10 09 37 23 5.2 -9 670.40 -52.5 -52.2 -52.6 62 -99 SPO 1997 04 10 09 38 24 4.9 -9 670.40 -52.6 -52.3 -52.7 63 -99 SPO 1997 04 10 09 39 25 4.8 -9 670.40 -52.6 -52.3 -52.8 62 -99 SPO 1997 04 10 09 40 25 4.5 -9 670.40 -52.6 -52.4 -52.8 62 -99 SPO 1997 04 10 09 41 26 4.6 -9 670.40 -52.7 -52.4 -52.9 62 -99 SPO 1997 04 10 09 42 24 4.8 -9 670.40 -52.8 -52.4 -52.9 62 -99 SPO 1997 04 10 09 43 22 5.2 -9 670.40 -52.8 -52.4 -52.8 62 -99 SPO 1997 04 10 09 44 21 5.5 -9 670.40 -52.8 -52.4 -52.8 62 -99 SPO 1997 04 10 09 45 21 5.7 -9 670.40 -52.7 -52.4 -52.7 62 -99 SPO 1997 04 10 09 46 21 5.6 -9 670.40 -52.7 -52.4 -52.8 62 -99 SPO 1997 04 10 09 47 22 5.5 -9 670.40 -52.8 -52.4 -52.8 63 -99 SPO 1997 04 10 09 48 23 5.3 -9 670.40 -52.8 -52.4 -52.9 63 -99 SPO 1997 04 10 09 49 24 5.1 -9 670.40 -52.8 -52.5 -53.0 63 -99 SPO 1997 04 10 09 50 24 5.1 -9 670.40 -52.9 -52.5 -53.0 63 -99 SPO 1997 04 10 09 51 23 5.0 -9 670.40 -52.9 -52.5 -53.1 63 -99 SPO 1997 04 10 09 52 24 5.2 -9 670.40 -53.0 -52.5 -53.1 63 -99 SPO 1997 04 10 09 53 24 5.2 -9 670.40 -53.0 -52.4 -53.0 62 -99 SPO 1997 04 10 09 54 24 5.3 -9 670.40 -53.0 -52.5 -53.0 62 -99 SPO 1997 04 10 09 55 22 5.6 -9 670.40 -52.9 -52.5 -53.0 61 -99 SPO 1997 04 10 09 56 21 5.5 -9 670.30 -52.9 -52.6 -53.0 62 -99 SPO 1997 04 10 09 57 19 5.3 -9 670.30 -52.9 -52.6 -53.0 62 -99 SPO 1997 04 10 09 58 19 5.6 -9 670.30 -52.9 -52.6 -53.0 63 -99 SPO 1997 04 10 09 59 19 5.5 -9 670.30 -52.9 -52.5 -53.0 63 -99 SPO 1997 04 10 10 00 18 5.8 -9 670.30 -52.8 -52.5 -52.8 62 0 SPO 1997 04 10 10 01 18 5.8 -9 670.30 -52.8 -52.5 -52.8 63 -99 SPO 1997 04 10 10 02 18 5.8 -9 670.30 -52.8 -52.5 -52.8 63 -99 SPO 1997 04 10 10 03 16 5.7 -9 670.30 -52.8 -52.5 -52.8 64 -99 SPO 1997 04 10 10 04 16 5.5 -9 670.30 -52.7 -52.5 -52.8 63 -99 SPO 1997 04 10 10 05 17 5.3 -9 670.40 -52.7 -52.5 -52.8 63 -99 SPO 1997 04 10 10 06 18 5.0 -9 670.40 -52.7 -52.5 -52.8 62 -99 SPO 1997 04 10 10 07 19 5.0 -9 670.40 -52.7 -52.5 -52.9 62 -99 SPO 1997 04 10 10 08 21 5.0 -9 670.40 -52.7 -52.5 -52.8 62 -99 SPO 1997 04 10 10 09 21 4.7 -9 670.30 -52.7 -52.5 -52.8 62 -99 SPO 1997 04 10 10 10 19 5.5 -9 670.30 -52.7 -52.4 -52.8 62 -99 SPO 1997 04 10 10 11 20 4.9 -9 670.30 -52.7 -52.4 -52.7 63 -99 SPO 1997 04 10 10 12 19 4.7 -9 670.30 -52.6 -52.4 -52.8 62 -99 SPO 1997 04 10 10 13 18 4.7 -9 670.30 -52.7 -52.5 -52.8 64 -99 SPO 1997 04 10 10 14 17 4.8 -9 670.30 -52.7 -52.5 -52.8 64 -99 SPO 1997 04 10 10 15 18 4.5 -9 670.30 -52.6 -52.5 -52.7 64 -99 SPO 1997 04 10 10 16 16 4.8 -9 670.40 -52.6 -52.5 -52.7 64 -99 SPO 1997 04 10 10 17 13 5.5 -9 670.40 -52.6 -52.4 -52.6 63 -99 SPO 1997 04 10 10 18 11 5.6 -9 670.30 -52.5 -52.4 -52.5 62 -99 SPO 1997 04 10 10 19 10 6.0 -9 670.30 -52.5 -52.3 -52.5 63 -99 SPO 1997 04 10 10 20 11 5.9 -9 670.30 -52.4 -52.3 -52.4 62 -99 SPO 1997 04 10 10 21 12 5.8 -9 670.30 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 10 22 14 5.3 -9 670.40 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 10 23 15 5.8 -9 670.40 -52.3 -52.3 -52.4 64 -99 SPO 1997 04 10 10 24 16 5.3 -9 670.40 -52.3 -52.2 -52.4 65 -99 SPO 1997 04 10 10 25 17 5.4 -9 670.40 -52.3 -52.3 -52.4 65 -99 SPO 1997 04 10 10 26 15 5.3 -9 670.40 -52.3 -52.3 -52.4 65 -99 SPO 1997 04 10 10 27 16 5.4 -9 670.40 -52.3 -52.3 -52.4 65 -99 SPO 1997 04 10 10 28 14 5.5 -9 670.40 -52.3 -52.2 -52.4 63 -99 SPO 1997 04 10 10 29 15 5.5 -9 670.40 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 10 30 14 5.3 -9 670.40 -52.3 -52.3 -52.4 62 -99 SPO 1997 04 10 10 31 13 5.6 -9 670.40 -52.3 -52.3 -52.4 62 -99 SPO 1997 04 10 10 32 13 5.5 -9 670.30 -52.3 -52.3 -52.4 62 -99 SPO 1997 04 10 10 33 12 6.5 -9 670.30 -52.3 -52.2 -52.4 63 -99 SPO 1997 04 10 10 34 12 6.3 -9 670.30 -52.2 -52.2 -52.3 62 -99 SPO 1997 04 10 10 35 12 6.6 -9 670.30 -52.2 -52.2 -52.3 63 -99 SPO 1997 04 10 10 36 12 6.4 -9 670.20 -52.2 -52.2 -52.3 64 -99 SPO 1997 04 10 10 37 11 6.7 -9 670.20 -52.2 -52.2 -52.3 65 -99 SPO 1997 04 10 10 38 13 6.6 -9 670.20 -52.2 -52.2 -52.2 65 -99 SPO 1997 04 10 10 39 13 6.2 -9 670.20 -52.1 -52.2 -52.2 64 -99 SPO 1997 04 10 10 40 15 6.0 -9 670.30 -52.2 -52.2 -52.3 65 -99 SPO 1997 04 10 10 41 16 5.8 -9 670.30 -52.2 -52.2 -52.3 64 -99 SPO 1997 04 10 10 42 19 6.1 -9 670.30 -52.2 -52.2 -52.3 63 -99 SPO 1997 04 10 10 43 19 5.8 -9 670.30 -52.2 -52.2 -52.2 63 -99 SPO 1997 04 10 10 44 17 5.7 -9 670.30 -52.2 -52.2 -52.3 62 -99 SPO 1997 04 10 10 45 18 5.9 -9 670.30 -52.2 -52.1 -52.2 63 -99 SPO 1997 04 10 10 46 16 6.2 -9 670.30 -52.1 -52.1 -52.2 62 -99 SPO 1997 04 10 10 47 14 6.1 -9 670.30 -52.1 -52.2 -52.2 63 -99 SPO 1997 04 10 10 48 15 6.6 -9 670.30 -52.1 -52.2 -52.2 63 -99 SPO 1997 04 10 10 49 14 6.5 -9 670.30 -52.2 -52.2 -52.3 65 -99 SPO 1997 04 10 10 50 13 6.1 -9 670.30 -52.2 -52.2 -52.3 65 -99 SPO 1997 04 10 10 51 11 6.4 -9 670.30 -52.2 -52.2 -52.3 64 -99 SPO 1997 04 10 10 52 12 6.4 -9 670.30 -52.2 -52.3 -52.3 63 -99 SPO 1997 04 10 10 53 12 6.3 -9 670.30 -52.2 -52.2 -52.2 63 -99 SPO 1997 04 10 10 54 12 6.5 -9 670.30 -52.2 -52.2 -52.3 63 -99 SPO 1997 04 10 10 55 13 6.3 -9 670.30 -52.2 -52.2 -52.3 63 -99 SPO 1997 04 10 10 56 13 6.6 -9 670.30 -52.2 -52.2 -52.3 64 -99 SPO 1997 04 10 10 57 14 6.4 -9 670.30 -52.2 -52.3 -52.3 64 -99 SPO 1997 04 10 10 58 13 6.1 -9 670.30 -52.2 -52.2 -52.4 64 -99 SPO 1997 04 10 10 59 13 6.1 -9 670.30 -52.2 -52.3 -52.4 64 -99 SPO 1997 04 10 11 00 13 5.9 -9 670.30 -52.3 -52.3 -52.4 65 0 SPO 1997 04 10 11 01 15 5.8 -9 670.30 -52.3 -52.3 -52.4 65 -99 SPO 1997 04 10 11 02 17 6.0 -9 670.30 -52.3 -52.3 -52.5 64 -99 SPO 1997 04 10 11 03 18 5.9 -9 670.30 -52.4 -52.3 -52.5 65 -99 SPO 1997 04 10 11 04 18 5.5 -9 670.30 -52.4 -52.3 -52.5 64 -99 SPO 1997 04 10 11 05 16 5.6 -9 670.30 -52.4 -52.4 -52.5 62 -99 SPO 1997 04 10 11 06 15 6.0 -9 670.30 -52.4 -52.4 -52.5 62 -99 SPO 1997 04 10 11 07 16 6.3 -9 670.30 -52.4 -52.4 -52.5 62 -99 SPO 1997 04 10 11 08 15 6.0 -9 670.30 -52.4 -52.4 -52.5 62 -99 SPO 1997 04 10 11 09 14 6.6 -9 670.20 -52.4 -52.4 -52.5 63 -99 SPO 1997 04 10 11 10 14 6.5 -9 670.20 -52.4 -52.4 -52.5 63 -99 SPO 1997 04 10 11 11 14 6.4 -9 670.20 -52.5 -52.5 -52.5 65 -99 SPO 1997 04 10 11 12 13 6.4 -9 670.20 -52.5 -52.5 -52.6 65 -99 SPO 1997 04 10 11 13 12 6.3 -9 670.20 -52.5 -52.5 -52.6 64 -99 SPO 1997 04 10 11 14 13 6.8 -9 670.20 -52.5 -52.5 -52.6 64 -99 SPO 1997 04 10 11 15 13 6.6 -9 670.20 -52.5 -52.4 -52.6 64 -99 SPO 1997 04 10 11 16 13 6.3 -9 670.20 -52.5 -52.5 -52.6 63 -99 SPO 1997 04 10 11 17 14 6.4 -9 670.20 -52.6 -52.5 -52.8 63 -99 SPO 1997 04 10 11 18 14 6.4 -9 670.20 -52.6 -52.5 -52.7 62 -99 SPO 1997 04 10 11 19 14 6.2 -9 670.20 -52.6 -52.5 -52.8 62 -99 SPO 1997 04 10 11 20 14 6.5 -9 670.20 -52.7 -52.5 -52.8 63 -99 SPO 1997 04 10 11 21 14 6.4 -9 670.20 -52.7 -52.5 -52.8 63 -99 SPO 1997 04 10 11 22 14 6.7 -9 670.20 -52.7 -52.5 -52.7 63 -99 SPO 1997 04 10 11 23 13 6.4 -9 670.20 -52.7 -52.6 -52.8 64 -99 SPO 1997 04 10 11 24 12 6.4 -9 670.20 -52.7 -52.6 -52.8 64 -99 SPO 1997 04 10 11 25 11 6.5 -9 670.20 -52.7 -52.6 -52.8 64 -99 SPO 1997 04 10 11 26 11 6.4 -9 670.20 -52.7 -52.7 -52.8 64 -99 SPO 1997 04 10 11 27 12 6.6 -9 670.20 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 11 28 12 6.8 -9 670.10 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 11 29 12 6.3 -9 670.10 -52.7 -52.7 -52.8 62 -99 SPO 1997 04 10 11 30 13 6.6 -9 670.10 -52.7 -52.7 -52.8 62 -99 SPO 1997 04 10 11 31 13 6.6 -9 670.10 -52.8 -52.7 -52.8 63 -99 SPO 1997 04 10 11 32 12 7.1 -9 670.10 -52.8 -52.7 -52.8 63 -99 SPO 1997 04 10 11 33 12 6.9 -9 670.00 -52.7 -52.6 -52.8 63 -99 SPO 1997 04 10 11 34 12 6.8 -9 670.00 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 11 35 12 6.6 -9 670.00 -52.8 -52.7 -52.9 64 -99 SPO 1997 04 10 11 36 12 7.0 -9 670.00 -52.8 -52.6 -52.9 64 -99 SPO 1997 04 10 11 37 12 7.1 -9 670.00 -52.8 -52.7 -52.8 64 -99 SPO 1997 04 10 11 38 11 6.9 -9 670.00 -52.8 -52.6 -52.8 64 -99 SPO 1997 04 10 11 39 12 7.5 -9 670.00 -52.8 -52.6 -52.8 64 -99 SPO 1997 04 10 11 40 12 7.4 -9 670.00 -52.7 -52.6 -52.8 62 -99 SPO 1997 04 10 11 41 12 7.2 -9 670.00 -52.7 -52.7 -52.9 62 -99 SPO 1997 04 10 11 42 12 7.3 -9 670.00 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 11 43 13 7.0 -9 670.00 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 11 44 14 7.2 -9 670.00 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 11 45 14 6.9 -9 670.00 -52.8 -52.8 -53.0 63 -99 SPO 1997 04 10 11 46 16 7.0 -9 670.10 -52.8 -52.8 -53.0 63 -99 SPO 1997 04 10 11 47 16 7.4 -9 670.00 -52.9 -52.8 -53.0 64 -99 SPO 1997 04 10 11 48 15 7.1 -9 670.00 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 11 49 15 7.5 -9 670.00 -52.9 -52.8 -53.0 64 -99 SPO 1997 04 10 11 50 15 7.5 -9 670.00 -52.9 -52.8 -52.9 63 -99 SPO 1997 04 10 11 51 16 6.9 -9 670.00 -52.8 -52.8 -53.0 62 -99 SPO 1997 04 10 11 52 18 6.8 -9 670.00 -52.9 -52.9 -53.0 63 -99 SPO 1997 04 10 11 53 18 6.5 -9 670.10 -52.9 -52.9 -53.0 62 -99 SPO 1997 04 10 11 54 17 6.4 -9 670.10 -52.9 -52.9 -53.0 62 -99 SPO 1997 04 10 11 55 18 6.5 -9 670.10 -52.9 -52.9 -53.0 62 -99 SPO 1997 04 10 11 56 16 6.4 -9 670.00 -52.9 -52.8 -53.0 62 -99 SPO 1997 04 10 11 57 15 6.9 -9 670.00 -52.9 -52.8 -53.0 62 -99 SPO 1997 04 10 11 58 14 6.8 -9 670.00 -52.9 -52.8 -52.9 63 -99 SPO 1997 04 10 11 59 14 7.0 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 00 15 6.8 -9 670.00 -52.8 -52.9 -52.9 63 0 SPO 1997 04 10 12 01 14 6.9 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 02 15 7.0 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 03 15 6.7 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 04 16 6.4 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 05 16 6.5 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 06 16 6.5 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 07 16 6.8 -9 670.00 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 12 08 15 6.9 -9 670.00 -52.8 -52.8 -52.8 63 -99 SPO 1997 04 10 12 09 13 7.0 -9 670.00 -52.7 -52.8 -52.8 63 -99 SPO 1997 04 10 12 10 12 7.4 -9 670.00 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 11 12 7.2 -9 670.00 -52.7 -52.7 -52.7 64 -99 SPO 1997 04 10 12 12 11 7.7 -9 670.00 -52.6 -52.7 -52.7 63 -99 SPO 1997 04 10 12 13 11 7.8 -9 670.00 -52.6 -52.6 -52.6 63 -99 SPO 1997 04 10 12 14 10 7.8 -9 670.00 -52.6 -52.6 -52.6 63 -99 SPO 1997 04 10 12 15 10 7.5 -9 670.00 -52.5 -52.7 -52.6 62 -99 SPO 1997 04 10 12 16 9 7.3 -9 670.00 -52.6 -52.7 -52.6 63 -99 SPO 1997 04 10 12 17 9 7.3 -9 670.00 -52.6 -52.8 -52.7 62 -99 SPO 1997 04 10 12 18 10 7.6 -9 670.00 -52.6 -52.8 -52.7 63 -99 SPO 1997 04 10 12 19 10 7.2 -9 670.00 -52.6 -52.8 -52.7 63 -99 SPO 1997 04 10 12 20 11 7.4 -9 670.00 -52.6 -52.8 -52.7 64 -99 SPO 1997 04 10 12 21 12 7.0 -9 670.00 -52.6 -52.8 -52.8 64 -99 SPO 1997 04 10 12 22 12 7.1 -9 670.00 -52.6 -52.8 -52.8 64 -99 SPO 1997 04 10 12 23 13 6.9 -9 670.00 -52.7 -52.8 -52.8 65 -99 SPO 1997 04 10 12 24 13 7.0 -9 670.00 -52.7 -52.8 -52.8 64 -99 SPO 1997 04 10 12 25 14 6.9 -9 670.00 -52.7 -52.7 -52.8 64 -99 SPO 1997 04 10 12 26 14 7.3 -9 670.00 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 27 14 7.3 -9 670.00 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 28 14 7.2 -9 670.00 -52.7 -52.7 -52.8 62 -99 SPO 1997 04 10 12 29 14 7.0 -9 670.00 -52.7 -52.7 -52.8 62 -99 SPO 1997 04 10 12 30 14 6.7 -9 670.00 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 31 15 6.8 -9 670.00 -52.7 -52.7 -52.8 62 -99 SPO 1997 04 10 12 32 15 6.8 -9 670.00 -52.7 -52.7 -52.8 62 -99 SPO 1997 04 10 12 33 13 6.6 -9 670.00 -52.7 -52.8 -52.8 63 -99 SPO 1997 04 10 12 34 14 6.8 -9 670.10 -52.8 -52.8 -52.9 64 -99 SPO 1997 04 10 12 35 13 6.9 -9 670.10 -52.7 -52.8 -52.9 63 -99 SPO 1997 04 10 12 36 13 7.0 -9 670.00 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 37 12 6.6 -9 670.00 -52.7 -52.7 -52.7 63 -99 SPO 1997 04 10 12 38 12 6.8 -9 670.10 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 39 12 6.8 -9 670.10 -52.7 -52.7 -52.8 63 -99 SPO 1997 04 10 12 40 12 6.6 -9 670.10 -52.7 -52.7 -52.7 63 -99 SPO 1997 04 10 12 41 13 6.5 -9 670.10 -52.7 -52.6 -52.7 63 -99 SPO 1997 04 10 12 42 14 6.6 -9 670.00 -52.7 -52.6 -52.7 64 -99 SPO 1997 04 10 12 43 15 6.5 -9 670.00 -52.6 -52.6 -52.7 63 -99 SPO 1997 04 10 12 44 16 6.3 -9 670.10 -52.6 -52.5 -52.7 64 -99 SPO 1997 04 10 12 45 16 6.5 -9 670.10 -52.6 -52.5 -52.7 64 -99 SPO 1997 04 10 12 46 15 6.4 -9 670.10 -52.6 -52.5 -52.6 64 -99 SPO 1997 04 10 12 47 15 6.7 -9 670.10 -52.6 -52.5 -52.6 64 -99 SPO 1997 04 10 12 48 15 6.7 -9 670.10 -52.5 -52.4 -52.6 63 -99 SPO 1997 04 10 12 49 14 6.7 -9 670.10 -52.5 -52.4 -52.6 63 -99 SPO 1997 04 10 12 50 14 7.0 -9 670.10 -52.5 -52.4 -52.5 63 -99 SPO 1997 04 10 12 51 13 7.0 -9 670.10 -52.5 -52.5 -52.5 63 -99 SPO 1997 04 10 12 52 15 6.6 -9 670.10 -52.5 -52.5 -52.6 64 -99 SPO 1997 04 10 12 53 13 7.1 -9 670.10 -52.5 -52.5 -52.5 64 -99 SPO 1997 04 10 12 54 13 6.7 -9 670.10 -52.4 -52.5 -52.5 63 -99 SPO 1997 04 10 12 55 13 6.7 -9 670.10 -52.5 -52.5 -52.6 64 -99 SPO 1997 04 10 12 56 14 7.0 -9 670.10 -52.5 -52.4 -52.5 65 -99 SPO 1997 04 10 12 57 16 6.5 -9 670.10 -52.5 -52.4 -52.6 65 -99 SPO 1997 04 10 12 58 17 6.6 -9 670.10 -52.5 -52.4 -52.6 65 -99 SPO 1997 04 10 12 59 17 7.0 -9 670.00 -52.5 -52.4 -52.5 65 -99 SPO 1997 04 10 13 00 14 7.2 -9 670.00 -52.4 -52.4 -52.5 63 0 SPO 1997 04 10 13 01 12 7.7 -9 670.00 -52.4 -52.4 -52.4 64 -99 SPO 1997 04 10 13 02 11 7.6 -9 670.00 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 13 03 11 7.5 -9 670.00 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 13 04 11 7.3 -9 670.10 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 13 05 12 6.9 -9 670.10 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 13 06 11 7.3 -9 670.10 -52.3 -52.3 -52.4 63 -99 SPO 1997 04 10 13 07 12 6.7 -9 670.10 -52.3 -52.4 -52.4 63 -99 SPO 1997 04 10 13 08 13 6.8 -9 670.10 -52.3 -52.4 -52.4 64 -99 SPO 1997 04 10 13 09 13 6.9 -9 670.10 -52.3 -52.4 -52.4 65 -99 SPO 1997 04 10 13 10 12 7.1 -9 670.10 -52.3 -52.4 -52.4 65 -99 SPO 1997 04 10 13 11 11 7.3 -9 670.10 -52.3 -52.4 -52.4 65 -99 SPO 1997 04 10 13 12 10 7.3 -9 670.10 -52.3 -52.4 -52.4 64 -99 SPO 1997 04 10 13 13 11 7.3 -9 670.10 -52.3 -52.4 -52.4 64 -99 SPO 1997 04 10 13 14 11 7.2 -9 670.00 -52.3 -52.4 -52.4 63 -99 SPO 1997 04 10 13 15 11 7.0 -9 670.00 -52.3 -52.4 -52.5 63 -99 SPO 1997 04 10 13 16 11 7.5 -9 670.00 -52.3 -52.4 -52.4 63 -99 SPO 1997 04 10 13 17 11 7.5 -9 670.00 -52.3 -52.4 -52.4 63 -99 SPO 1997 04 10 13 18 11 6.9 -9 670.00 -52.3 -52.4 -52.5 64 -99 SPO 1997 04 10 13 19 11 7.2 -9 670.00 -52.4 -52.4 -52.5 65 -99 SPO 1997 04 10 13 20 12 7.0 -9 670.00 -52.4 -52.4 -52.5 65 -99 SPO 1997 04 10 13 21 13 7.2 -9 670.00 -52.4 -52.4 -52.5 64 -99 SPO 1997 04 10 13 22 11 7.1 -9 670.00 -52.4 -52.4 -52.6 64 -99 SPO 1997 04 10 13 23 11 7.0 -9 670.00 -52.4 -52.4 -52.6 64 -99 SPO 1997 04 10 13 24 11 7.0 -9 670.10 -52.4 -52.4 -52.6 63 -99 SPO 1997 04 10 13 25 10 7.0 -9 670.10 -52.4 -52.5 -52.6 62 -99 SPO 1997 04 10 13 26 10 7.2 -9 670.10 -52.5 -52.5 -52.6 63 -99 SPO 1997 04 10 13 27 10 7.1 -9 670.10 -52.5 -52.6 -52.6 63 -99 SPO 1997 04 10 13 28 11 7.0 -9 670.10 -52.5 -52.6 -52.6 62 -99 SPO 1997 04 10 13 29 11 6.8 -9 670.10 -52.5 -52.6 -52.6 63 -99 SPO 1997 04 10 13 30 12 6.9 -9 670.10 -52.5 -52.6 -52.6 63 -99 SPO 1997 04 10 13 31 12 7.2 -9 670.10 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 32 12 6.9 -9 670.10 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 33 11 7.3 -9 670.10 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 34 12 7.5 -9 670.10 -52.5 -52.6 -52.5 64 -99 SPO 1997 04 10 13 35 13 7.3 -9 670.10 -52.5 -52.6 -52.5 63 -99 SPO 1997 04 10 13 36 12 7.3 -9 670.00 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 37 11 7.2 -9 670.10 -52.4 -52.6 -52.6 63 -99 SPO 1997 04 10 13 38 10 7.0 -9 670.00 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 39 10 7.8 -9 670.00 -52.5 -52.6 -52.6 63 -99 SPO 1997 04 10 13 40 8 7.8 -9 670.00 -52.5 -52.5 -52.6 64 -99 SPO 1997 04 10 13 41 8 7.7 -9 670.00 -52.5 -52.5 -52.6 64 -99 SPO 1997 04 10 13 42 5 8.4 -9 670.00 -52.4 -52.5 -52.6 63 -99 SPO 1997 04 10 13 43 5 7.9 -9 670.00 -52.5 -52.6 -52.5 65 -99 SPO 1997 04 10 13 44 5 8.2 -9 670.00 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 45 5 8.3 -9 670.00 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 46 5 7.5 -9 670.00 -52.5 -52.6 -52.6 64 -99 SPO 1997 04 10 13 47 6 7.8 -9 670.00 -52.5 -52.7 -52.6 63 -99 SPO 1997 04 10 13 48 7 7.1 -9 670.00 -52.6 -52.7 -52.7 63 -99 SPO 1997 04 10 13 49 8 6.7 -9 670.00 -52.6 -52.7 -52.8 62 -99 SPO 1997 04 10 13 50 10 7.0 -9 670.00 -52.6 -52.7 -52.7 62 -99 SPO 1997 04 10 13 51 9 7.2 -9 670.00 -52.6 -52.7 -52.7 62 -99 SPO 1997 04 10 13 52 9 7.1 -9 670.00 -52.6 -52.7 -52.7 63 -99 SPO 1997 04 10 13 53 9 7.0 -9 670.00 -52.6 -52.6 -52.7 63 -99 SPO 1997 04 10 13 54 10 6.9 -9 670.00 -52.6 -52.7 -52.7 64 -99 SPO 1997 04 10 13 55 10 6.9 -9 670.00 -52.6 -52.6 -52.7 64 -99 SPO 1997 04 10 13 56 10 7.0 -9 670.10 -52.6 -52.6 -52.7 64 -99 SPO 1997 04 10 13 57 10 7.0 -9 670.10 -52.6 -52.6 -52.7 64 -99 SPO 1997 04 10 13 58 9 7.5 -9 670.10 -52.6 -52.6 -52.7 63 -99 SPO 1997 04 10 13 59 10 7.1 -9 670.00 -52.6 -52.6 -52.6 62 -99 SPO 1997 04 10 14 00 10 6.9 -9 670.00 -52.6 -52.7 -52.7 62 0 SPO 1997 04 10 14 01 9 7.0 -9 670.00 -52.6 -52.7 -52.7 62 -99 SPO 1997 04 10 14 02 9 7.3 -9 670.00 -52.6 -52.7 -52.7 62 -99 SPO 1997 04 10 14 03 10 7.0 -9 670.00 -52.6 -52.7 -52.7 63 -99 SPO 1997 04 10 14 04 11 7.2 -9 670.10 -52.6 -52.8 -52.7 63 -99 SPO 1997 04 10 14 05 10 6.6 -9 670.10 -52.6 -52.8 -52.7 64 -99 SPO 1997 04 10 14 06 11 6.5 -9 670.10 -52.6 -52.8 -52.8 64 -99 SPO 1997 04 10 14 07 11 6.9 -9 670.10 -52.6 -52.8 -52.8 64 -99 SPO 1997 04 10 14 08 11 6.7 -9 670.20 -52.6 -52.8 -52.7 64 -99 SPO 1997 04 10 14 09 12 6.5 -9 670.20 -52.7 -52.8 -52.8 65 -99 SPO 1997 04 10 14 10 12 7.1 -9 670.20 -52.7 -52.8 -52.8 64 -99 SPO 1997 04 10 14 11 12 6.8 -9 670.10 -52.7 -52.8 -52.8 63 -99 SPO 1997 04 10 14 12 12 6.8 -9 670.10 -52.7 -52.8 -52.9 63 -99 SPO 1997 04 10 14 13 13 6.6 -9 670.10 -52.7 -52.8 -52.8 62 -99 SPO 1997 04 10 14 14 13 6.3 -9 670.10 -52.7 -52.8 -52.9 62 -99 SPO 1997 04 10 14 15 12 6.3 -9 670.10 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 14 16 12 6.1 -9 670.10 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 14 17 10 7.0 -9 670.10 -52.8 -52.8 -52.9 63 -99 SPO 1997 04 10 14 18 12 6.4 -9 670.10 -52.8 -52.9 -52.9 63 -99 SPO 1997 04 10 14 19 12 6.3 -9 670.10 -52.8 -53.0 -53.0 63 -99 SPO 1997 04 10 14 20 13 6.9 -9 670.10 -52.8 -53.0 -53.0 63 -99 SPO 1997 04 10 14 21 12 6.1 -9 670.10 -52.8 -53.0 -53.0 63 -99 SPO 1997 04 10 14 22 13 6.3 -9 670.10 -52.8 -53.0 -53.0 62 -99 SPO 1997 04 10 14 23 13 6.5 -9 670.00 -52.9 -53.0 -53.0 63 -99 SPO 1997 04 10 14 24 12 6.5 -9 670.00 -52.9 -53.0 -53.0 63 -99 SPO 1997 04 10 14 25 14 6.1 -9 670.00 -52.9 -53.0 -53.0 62 -99 SPO 1997 04 10 14 26 14 6.1 -9 670.00 -53.0 -53.0 -53.0 63 -99 SPO 1997 04 10 14 27 14 6.5 -9 670.00 -53.0 -53.0 -53.1 63 -99 SPO 1997 04 10 14 28 14 6.8 -9 670.00 -53.0 -53.0 -53.0 63 -99 SPO 1997 04 10 14 29 11 6.8 -9 670.00 -53.0 -53.0 -53.0 63 -99 SPO 1997 04 10 14 30 10 7.7 -9 670.00 -53.0 -53.0 -53.0 64 -99 SPO 1997 04 10 14 31 11 7.5 -9 670.00 -53.0 -53.0 -53.0 64 -99 SPO 1997 04 10 14 32 10 7.5 -9 670.00 -53.0 -53.0 -53.1 64 -99 SPO 1997 04 10 14 33 10 7.1 -9 670.00 -53.0 -53.0 -53.1 63 -99 SPO 1997 04 10 14 34 11 7.2 -9 670.00 -53.0 -53.0 -53.2 62 -99 SPO 1997 04 10 14 35 12 7.5 -9 670.00 -53.0 -53.0 -53.2 61 -99 SPO 1997 04 10 14 36 12 7.9 -9 670.00 -53.1 -53.1 -53.2 62 -99 SPO 1997 04 10 14 37 11 7.9 -9 670.00 -53.1 -53.1 -53.2 61 -99 SPO 1997 04 10 14 38 12 7.4 -9 669.90 -53.1 -53.1 -53.2 62 -99 SPO 1997 04 10 14 39 12 7.1 -9 669.90 -53.1 -53.2 -53.3 62 -99 SPO 1997 04 10 14 40 12 7.2 -9 669.90 -53.2 -53.2 -53.4 64 -99 SPO 1997 04 10 14 41 12 7.5 -9 669.90 -53.2 -53.2 -53.4 63 -99 SPO 1997 04 10 14 42 12 7.7 -9 669.80 -53.3 -53.2 -53.4 64 -99 SPO 1997 04 10 14 43 12 7.7 -9 669.80 -53.3 -53.2 -53.4 64 -99 SPO 1997 04 10 14 44 11 7.9 -9 669.80 -53.3 -53.2 -53.4 64 -99 SPO 1997 04 10 14 45 11 7.9 -9 669.80 -53.3 -53.2 -53.4 64 -99 SPO 1997 04 10 14 46 10 8.1 -9 669.80 -53.3 -53.2 -53.4 63 -99 SPO 1997 04 10 14 47 11 7.9 -9 669.80 -53.4 -53.2 -53.5 63 -99 SPO 1997 04 10 14 48 10 8.5 -9 669.70 -53.4 -53.2 -53.5 63 -99 SPO 1997 04 10 14 49 10 8.2 -9 669.80 -53.4 -53.2 -53.5 62 -99 SPO 1997 04 10 14 50 9 8.2 -9 669.80 -53.4 -53.2 -53.5 63 -99 SPO 1997 04 10 14 51 9 8.2 -9 669.80 -53.4 -53.2 -53.5 63 -99 SPO 1997 04 10 14 52 9 8.3 -9 669.80 -53.4 -53.3 -53.6 62 -99 SPO 1997 04 10 14 53 10 7.9 -9 669.80 -53.4 -53.4 -53.6 62 -99 SPO 1997 04 10 14 54 9 7.7 -9 669.80 -53.5 -53.4 -53.6 63 -99 SPO 1997 04 10 14 55 9 7.5 -9 669.80 -53.5 -53.4 -53.6 63 -99 SPO 1997 04 10 14 56 9 7.7 -9 669.80 -53.5 -53.4 -53.6 63 -99 SPO 1997 04 10 14 57 10 7.7 -9 669.80 -53.5 -53.4 -53.6 62 -99 SPO 1997 04 10 14 58 9 7.8 -9 669.80 -53.6 -53.4 -53.6 63 -99 SPO 1997 04 10 14 59 8 7.7 -9 669.80 -53.6 -53.4 -53.6 63 -99 SPO 1997 04 10 15 00 8 8.1 -9 669.70 -53.6 -53.4 -53.6 63 0 SPO 1997 04 10 15 01 8 8.2 -9 669.70 -53.6 -53.4 -53.6 63 -99 SPO 1997 04 10 15 02 8 8.1 -9 669.70 -53.6 -53.4 -53.7 64 -99 SPO 1997 04 10 15 03 9 7.9 -9 669.70 -53.6 -53.4 -53.7 64 -99 SPO 1997 04 10 15 04 10 7.9 -9 669.70 -53.6 -53.4 -53.7 64 -99 SPO 1997 04 10 15 05 9 8.0 -9 669.70 -53.6 -53.4 -53.7 64 -99 SPO 1997 04 10 15 06 9 8.2 -9 669.70 -53.6 -53.4 -53.6 64 -99 SPO 1997 04 10 15 07 8 8.2 -9 669.70 -53.6 -53.4 -53.6 64 -99 SPO 1997 04 10 15 08 7 8.4 -9 669.70 -53.6 -53.4 -53.6 64 -99 SPO 1997 04 10 15 09 7 8.4 -9 669.60 -53.5 -53.4 -53.6 62 -99 SPO 1997 04 10 15 10 6 8.3 -9 669.60 -53.5 -53.4 -53.6 62 -99 SPO 1997 04 10 15 11 6 7.8 -9 669.60 -53.5 -53.4 -53.6 62 -99 SPO 1997 04 10 15 12 6 8.2 -9 669.60 -53.5 -53.4 -53.6 63 -99 SPO 1997 04 10 15 13 7 8.2 -9 669.60 -53.5 -53.5 -53.6 63 -99 SPO 1997 04 10 15 14 7 7.9 -9 669.60 -53.5 -53.5 -53.6 64 -99 SPO 1997 04 10 15 15 8 7.9 -9 669.60 -53.6 -53.5 -53.7 64 -99 SPO 1997 04 10 15 16 9 7.9 -9 669.60 -53.6 -53.5 -53.7 64 -99 SPO 1997 04 10 15 17 9 8.0 -9 669.60 -53.6 -53.5 -53.7 64 -99 SPO 1997 04 10 15 18 9 8.4 -9 669.50 -53.6 -53.5 -53.6 64 -99 SPO 1997 04 10 15 19 8 8.4 -9 669.50 -53.6 -53.5 -53.6 63 -99 SPO 1997 04 10 15 20 8 8.7 -9 669.50 -53.6 -53.5 -53.6 63 -99 SPO 1997 04 10 15 21 8 8.5 -9 669.50 -53.5 -53.5 -53.6 62 -99 SPO 1997 04 10 15 22 8 8.8 -9 669.50 -53.5 -53.5 -53.6 63 -99 SPO 1997 04 10 15 23 8 9.0 -9 669.50 -53.5 -53.5 -53.6 62 -99 SPO 1997 04 10 15 24 8 8.6 -9 669.50 -53.5 -53.5 -53.6 63 -99 SPO 1997 04 10 15 25 7 8.4 -9 669.50 -53.5 -53.5 -53.6 63 -99 SPO 1997 04 10 15 26 8 8.6 -9 669.50 -53.5 -53.5 -53.6 63 -99 SPO 1997 04 10 15 27 8 8.4 -9 669.50 -53.5 -53.6 -53.6 63 -99 SPO 1997 04 10 15 28 8 8.5 -9 669.50 -53.5 -53.6 -53.6 63 -99 SPO 1997 04 10 15 29 9 8.5 -9 669.50 -53.5 -53.6 -53.6 63 -99 SPO 1997 04 10 15 30 9 8.3 -9 669.50 -53.5 -53.6 -53.6 63 -99 SPO 1997 04 10 15 31 10 8.2 -9 669.50 -53.6 -53.7 -53.6 64 -99 SPO 1997 04 10 15 32 10 8.4 -9 669.50 -53.6 -53.7 -53.7 63 -99 SPO 1997 04 10 15 33 10 8.4 -9 669.50 -53.6 -53.7 -53.7 63 -99 SPO 1997 04 10 15 34 10 8.1 -9 669.50 -53.6 -53.7 -53.7 63 -99 SPO 1997 04 10 15 35 10 8.1 -9 669.50 -53.6 -53.7 -53.7 63 -99 SPO 1997 04 10 15 36 10 8.1 -9 669.50 -53.6 -53.7 -53.7 63 -99 SPO 1997 04 10 15 37 11 8.4 -9 669.50 -53.6 -53.7 -53.8 63 -99 SPO 1997 04 10 15 38 11 8.4 -9 669.50 -53.6 -53.7 -53.8 63 -99 SPO 1997 04 10 15 39 11 8.5 -9 669.50 -53.6 -53.7 -53.8 63 -99 SPO 1997 04 10 15 40 11 8.3 -9 669.50 -53.7 -53.7 -53.8 64 -99 SPO 1997 04 10 15 41 11 8.4 -9 669.50 -53.7 -53.7 -53.8 64 -99 SPO 1997 04 10 15 42 12 8.3 -9 669.50 -53.7 -53.7 -53.8 63 -99 SPO 1997 04 10 15 43 12 8.1 -9 669.50 -53.7 -53.7 -53.9 62 -99 SPO 1997 04 10 15 44 11 8.6 -9 669.50 -53.7 -53.7 -53.9 61 -99 SPO 1997 04 10 15 45 11 8.3 -9 669.50 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 15 46 11 8.7 -9 669.50 -53.8 -53.8 -53.8 62 -99 SPO 1997 04 10 15 47 11 8.7 -9 669.50 -53.7 -53.8 -53.8 62 -99 SPO 1997 04 10 15 48 11 8.7 -9 669.50 -53.7 -53.8 -53.8 62 -99 SPO 1997 04 10 15 49 11 9.0 -9 669.50 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 15 50 11 8.5 -9 669.50 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 15 51 12 8.4 -9 669.50 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 15 52 13 8.7 -9 669.50 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 15 53 13 9.0 -9 669.50 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 15 54 13 8.9 -9 669.50 -53.8 -53.8 -53.8 63 -99 SPO 1997 04 10 15 55 12 9.1 -9 669.50 -53.7 -53.8 -53.9 62 -99 SPO 1997 04 10 15 56 11 8.9 -9 669.50 -53.8 -53.8 -53.8 62 -99 SPO 1997 04 10 15 57 11 8.8 -9 669.50 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 15 58 12 8.7 -9 669.60 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 15 59 12 8.5 -9 669.50 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 16 00 12 8.5 -9 669.60 -53.8 -53.8 -53.9 62 0 SPO 1997 04 10 16 01 13 8.3 -9 669.60 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 16 02 13 8.4 -9 669.60 -53.8 -53.9 -53.9 62 -99 SPO 1997 04 10 16 03 13 8.1 -9 669.60 -53.8 -53.9 -53.9 63 -99 SPO 1997 04 10 16 04 13 8.2 -9 669.60 -53.8 -54.0 -53.9 63 -99 SPO 1997 04 10 16 05 12 8.5 -9 669.60 -53.8 -53.9 -53.9 62 -99 SPO 1997 04 10 16 06 12 8.5 -9 669.60 -53.8 -53.9 -53.9 62 -99 SPO 1997 04 10 16 07 11 8.6 -9 669.60 -53.8 -53.9 -54.0 62 -99 SPO 1997 04 10 16 08 11 8.3 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 09 12 8.3 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 10 12 8.6 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 11 12 8.5 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 12 12 8.6 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 13 13 8.2 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 14 13 8.6 -9 669.60 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 15 13 8.4 -9 669.50 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 16 14 8.3 -9 669.50 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 17 13 8.2 -9 669.50 -53.9 -53.9 -54.0 62 -99 SPO 1997 04 10 16 18 13 8.2 -9 669.60 -53.9 -53.9 -54.1 62 -99 SPO 1997 04 10 16 19 13 8.3 -9 669.60 -53.9 -53.9 -54.0 62 -99 SPO 1997 04 10 16 20 12 8.4 -9 669.60 -53.9 -54.0 -54.1 62 -99 SPO 1997 04 10 16 21 12 8.2 -9 669.50 -53.9 -54.0 -54.1 62 -99 SPO 1997 04 10 16 22 12 8.4 -9 669.50 -54.0 -53.9 -54.1 63 -99 SPO 1997 04 10 16 23 12 8.7 -9 669.50 -54.0 -54.0 -54.1 63 -99 SPO 1997 04 10 16 24 11 8.6 -9 669.50 -54.0 -53.9 -54.1 63 -99 SPO 1997 04 10 16 25 11 8.5 -9 669.50 -54.0 -53.9 -54.1 63 -99 SPO 1997 04 10 16 26 10 8.6 -9 669.50 -54.0 -53.9 -54.1 63 -99 SPO 1997 04 10 16 27 10 8.7 -9 669.50 -54.0 -53.9 -54.1 63 -99 SPO 1997 04 10 16 28 9 8.7 -9 669.50 -54.0 -53.9 -54.1 63 -99 SPO 1997 04 10 16 29 10 8.7 -9 669.50 -54.0 -53.8 -54.1 63 -99 SPO 1997 04 10 16 30 10 8.8 -9 669.50 -54.0 -53.8 -54.0 63 -99 SPO 1997 04 10 16 31 11 8.8 -9 669.50 -53.9 -53.8 -54.0 62 -99 SPO 1997 04 10 16 32 11 8.3 -9 669.50 -53.9 -53.8 -54.0 62 -99 SPO 1997 04 10 16 33 10 8.5 -9 669.50 -53.9 -53.8 -54.0 63 -99 SPO 1997 04 10 16 34 11 8.4 -9 669.50 -53.9 -53.8 -54.0 63 -99 SPO 1997 04 10 16 35 11 8.2 -9 669.50 -53.9 -53.8 -54.0 63 -99 SPO 1997 04 10 16 36 10 8.4 -9 669.50 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 16 37 10 8.6 -9 669.50 -53.9 -53.9 -53.9 63 -99 SPO 1997 04 10 16 38 9 8.6 -9 669.50 -53.8 -53.9 -53.9 64 -99 SPO 1997 04 10 16 39 10 8.4 -9 669.50 -53.8 -53.8 -53.9 64 -99 SPO 1997 04 10 16 40 10 8.7 -9 669.50 -53.8 -53.8 -53.9 64 -99 SPO 1997 04 10 16 41 9 9.1 -9 669.50 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 42 9 8.3 -9 669.50 -53.8 -53.8 -53.8 63 -99 SPO 1997 04 10 16 43 10 8.4 -9 669.60 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 44 9 7.8 -9 669.60 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 45 10 7.9 -9 669.60 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 46 11 7.9 -9 669.70 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 47 11 7.7 -9 669.70 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 48 11 7.8 -9 669.70 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 49 11 7.6 -9 669.70 -53.8 -53.8 -53.9 63 -99 SPO 1997 04 10 16 50 11 7.7 -9 669.70 -53.8 -53.8 -54.0 63 -99 SPO 1997 04 10 16 51 10 7.6 -9 669.70 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 16 52 11 7.6 -9 669.70 -53.8 -53.8 -53.9 62 -99 SPO 1997 04 10 16 53 11 7.4 -9 669.70 -53.8 -53.9 -54.0 62 -99 SPO 1997 04 10 16 54 12 7.4 -9 669.70 -53.8 -54.0 -53.9 62 -99 SPO 1997 04 10 16 55 12 7.4 -9 669.70 -53.8 -54.0 -53.9 61 -99 SPO 1997 04 10 16 56 13 7.1 -9 669.70 -53.8 -54.0 -53.9 61 -99 SPO 1997 04 10 16 57 12 7.1 -9 669.70 -53.9 -54.0 -54.0 62 -99 SPO 1997 04 10 16 58 12 7.9 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 16 59 11 7.6 -9 669.70 -53.9 -53.9 -54.0 63 -99 SPO 1997 04 10 17 00 11 7.6 -9 669.70 -53.9 -54.0 -54.0 63 0 SPO 1997 04 10 17 01 12 7.3 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 02 13 7.1 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 03 13 7.1 -9 669.70 -53.9 -54.0 -54.0 62 -99 SPO 1997 04 10 17 04 15 7.5 -9 669.70 -53.9 -54.0 -54.0 60 -99 SPO 1997 04 10 17 05 14 7.7 -9 669.70 -53.9 -53.9 -54.0 60 -99 SPO 1997 04 10 17 06 15 7.2 -9 669.70 -53.9 -53.9 -54.0 60 -99 SPO 1997 04 10 17 07 17 7.4 -9 669.70 -53.9 -53.9 -54.0 60 -99 SPO 1997 04 10 17 08 15 7.4 -9 669.70 -53.9 -53.9 -54.0 60 -99 SPO 1997 04 10 17 09 16 7.8 -9 669.70 -53.9 -54.0 -54.0 60 -99 SPO 1997 04 10 17 10 15 7.8 -9 669.70 -53.9 -54.0 -54.0 62 -99 SPO 1997 04 10 17 11 14 8.0 -9 669.70 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 12 13 8.7 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 13 12 8.4 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 14 12 8.1 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 15 12 8.9 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 16 11 8.5 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 17 12 8.3 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 18 14 8.1 -9 669.60 -53.9 -54.1 -54.0 62 -99 SPO 1997 04 10 17 19 15 7.5 -9 669.60 -53.9 -54.1 -54.0 62 -99 SPO 1997 04 10 17 20 16 7.9 -9 669.60 -53.9 -54.0 -54.0 62 -99 SPO 1997 04 10 17 21 14 8.2 -9 669.60 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 22 13 8.6 -9 669.60 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 23 14 8.4 -9 669.60 -53.8 -54.0 -53.9 63 -99 SPO 1997 04 10 17 24 13 7.6 -9 669.70 -53.8 -54.0 -53.9 63 -99 SPO 1997 04 10 17 25 13 7.7 -9 669.70 -53.8 -54.0 -53.9 63 -99 SPO 1997 04 10 17 26 14 7.9 -9 669.70 -53.8 -54.0 -53.9 62 -99 SPO 1997 04 10 17 27 15 7.5 -9 669.70 -53.8 -54.1 -53.9 62 -99 SPO 1997 04 10 17 28 15 7.3 -9 669.70 -53.8 -54.1 -53.9 62 -99 SPO 1997 04 10 17 29 16 7.5 -9 669.70 -53.8 -54.1 -53.9 62 -99 SPO 1997 04 10 17 30 15 7.7 -9 669.70 -53.8 -54.1 -53.9 62 -99 SPO 1997 04 10 17 31 14 8.3 -9 669.70 -53.8 -54.1 -53.9 62 -99 SPO 1997 04 10 17 32 15 7.9 -9 669.60 -53.8 -54.1 -54.0 62 -99 SPO 1997 04 10 17 33 15 7.8 -9 669.60 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 34 15 7.3 -9 669.70 -53.8 -54.1 -54.0 63 -99 SPO 1997 04 10 17 35 16 6.9 -9 669.70 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 36 16 7.2 -9 669.70 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 37 14 7.7 -9 669.80 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 38 13 7.1 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 39 12 7.7 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 40 11 7.3 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 41 12 7.4 -9 669.70 -53.9 -54.0 -54.0 63 -99 SPO 1997 04 10 17 42 12 7.8 -9 669.70 -53.9 -54.0 -54.0 62 -99 SPO 1997 04 10 17 43 13 7.5 -9 669.70 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 44 13 7.3 -9 669.70 -53.9 -54.1 -54.0 63 -99 SPO 1997 04 10 17 45 11 6.8 -9 669.70 -53.9 -54.2 -54.0 63 -99 SPO 1997 04 10 17 46 10 8.4 -9 669.60 -53.9 -54.2 -54.0 64 -99 SPO 1997 04 10 17 47 9 8.6 -9 669.60 -53.9 -54.1 -54.0 66 -99 SPO 1997 04 10 17 48 9 7.8 -9 669.60 -53.9 -54.1 -54.0 67 -99 SPO 1997 04 10 17 49 11 8.1 -9 669.60 -53.9 -54.1 -54.1 67 -99 SPO 1997 04 10 17 50 11 8.0 -9 669.60 -53.9 -54.1 -54.1 67 -99 SPO 1997 04 10 17 51 13 7.5 -9 669.70 -54.0 -54.1 -54.1 67 -99 SPO 1997 04 10 17 52 14 7.0 -9 669.70 -54.0 -54.1 -54.1 66 -99 SPO 1997 04 10 17 53 15 8.1 -9 669.70 -54.0 -54.1 -54.1 66 -99 SPO 1997 04 10 17 54 12 8.8 -9 669.70 -54.0 -54.1 -54.1 66 -99 SPO 1997 04 10 17 55 9 9.2 -9 669.60 -53.9 -54.1 -54.0 65 -99 SPO 1997 04 10 17 56 9 9.6 -9 669.60 -53.9 -54.1 -54.1 66 -99 SPO 1997 04 10 17 57 9 9.0 -9 669.60 -53.9 -54.1 -54.1 66 -99 SPO 1997 04 10 17 58 11 8.3 -9 669.70 -54.0 -54.1 -54.1 67 -99 SPO 1997 04 10 17 59 11 8.5 -9 669.70 -54.0 -54.1 -54.1 67 -99 SPO 1997 04 10 18 00 12 9.2 -9 669.70 -54.0 -54.1 -54.1 67 0 SPO 1997 04 10 18 01 12 8.5 -9 669.70 -54.0 -54.2 -54.0 67 -99 SPO 1997 04 10 18 02 13 8.5 -9 669.70 -54.0 -54.2 -54.0 67 -99 SPO 1997 04 10 18 03 13 8.2 -9 669.70 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 10 18 04 13 8.6 -9 669.70 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 10 18 05 14 8.1 -9 669.70 -53.9 -54.2 -54.0 65 -99 SPO 1997 04 10 18 06 14 9.0 -9 669.60 -54.0 -54.2 -54.1 66 -99 SPO 1997 04 10 18 07 12 9.6 -9 669.60 -54.0 -54.2 -54.1 66 -99 SPO 1997 04 10 18 08 13 9.4 -9 669.60 -54.0 -54.2 -54.1 66 -99 SPO 1997 04 10 18 09 13 8.8 -9 669.60 -54.0 -54.2 -54.1 65 -99 SPO 1997 04 10 18 10 13 8.9 -9 669.60 -54.0 -54.2 -54.2 65 -99 SPO 1997 04 10 18 11 13 9.3 -9 669.60 -54.0 -54.2 -54.1 65 -99 SPO 1997 04 10 18 12 13 8.9 -9 669.60 -54.0 -54.2 -54.1 64 -99 SPO 1997 04 10 18 13 14 8.3 -9 669.60 -54.0 -54.2 -54.2 64 -99 SPO 1997 04 10 18 14 15 8.4 -9 669.60 -54.0 -54.2 -54.2 63 -99 SPO 1997 04 10 18 15 15 8.4 -9 669.70 -54.0 -54.2 -54.2 63 -99 SPO 1997 04 10 18 16 16 8.4 -9 669.70 -54.0 -54.2 -54.1 63 -99 SPO 1997 04 10 18 17 15 8.2 -9 669.70 -54.0 -54.2 -54.2 63 -99 SPO 1997 04 10 18 18 12 8.6 -9 669.70 -54.0 -54.3 -54.1 64 -99 SPO 1997 04 10 18 19 12 9.0 -9 669.60 -54.1 -54.3 -54.1 65 -99 SPO 1997 04 10 18 20 12 9.0 -9 669.60 -54.0 -54.3 -54.2 64 -99 SPO 1997 04 10 18 21 12 8.8 -9 669.60 -54.0 -54.3 -54.2 64 -99 SPO 1997 04 10 18 22 13 8.7 -9 669.60 -54.1 -54.3 -54.2 66 -99 SPO 1997 04 10 18 23 14 8.7 -9 669.70 -54.1 -54.3 -54.2 66 -99 SPO 1997 04 10 18 24 16 8.6 -9 669.70 -54.1 -54.3 -54.2 65 -99 SPO 1997 04 10 18 25 16 8.2 -9 669.70 -54.1 -54.3 -54.2 64 -99 SPO 1997 04 10 18 26 16 8.6 -9 669.70 -54.1 -54.3 -54.2 64 -99 SPO 1997 04 10 18 27 14 8.9 -9 669.70 -54.1 -54.3 -54.2 64 -99 SPO 1997 04 10 18 28 14 9.6 -9 669.70 -54.1 -54.2 -54.2 63 -99 SPO 1997 04 10 18 29 12 9.7 -9 669.60 -54.1 -54.2 -54.2 64 -99 SPO 1997 04 10 18 30 13 8.8 -9 669.60 -54.1 -54.2 -54.2 64 -99 SPO 1997 04 10 18 31 13 9.4 -9 669.60 -54.1 -54.2 -54.2 64 -99 SPO 1997 04 10 18 32 13 9.1 -9 669.60 -54.1 -54.2 -54.2 64 -99 SPO 1997 04 10 18 33 13 8.9 -9 669.60 -54.1 -54.3 -54.3 64 -99 SPO 1997 04 10 18 34 13 9.9 -9 669.60 -54.1 -54.3 -54.2 64 -99 SPO 1997 04 10 18 35 13 9.0 -9 669.60 -54.1 -54.3 -54.2 64 -99 SPO 1997 04 10 18 36 13 8.7 -9 669.60 -54.2 -54.4 -54.3 65 -99 SPO 1997 04 10 18 37 13 8.5 -9 669.60 -54.2 -54.4 -54.3 64 -99 SPO 1997 04 10 18 38 12 8.5 -9 669.60 -54.2 -54.4 -54.3 64 -99 SPO 1997 04 10 18 39 12 8.7 -9 669.60 -54.2 -54.4 -54.3 63 -99 SPO 1997 04 10 18 40 12 8.9 -9 669.60 -54.2 -54.4 -54.3 63 -99 SPO 1997 04 10 18 41 12 8.7 -9 669.60 -54.2 -54.4 -54.3 63 -99 SPO 1997 04 10 18 42 13 8.8 -9 669.60 -54.2 -54.4 -54.3 64 -99 SPO 1997 04 10 18 43 14 8.9 -9 669.60 -54.2 -54.3 -54.3 64 -99 SPO 1997 04 10 18 44 16 8.7 -9 669.60 -54.2 -54.4 -54.4 64 -99 SPO 1997 04 10 18 45 15 8.4 -9 669.60 -54.3 -54.4 -54.4 65 -99 SPO 1997 04 10 18 46 15 9.2 -9 669.60 -54.3 -54.4 -54.4 65 -99 SPO 1997 04 10 18 47 14 9.3 -9 669.60 -54.3 -54.4 -54.4 63 -99 SPO 1997 04 10 18 48 14 8.8 -9 669.60 -54.3 -54.4 -54.4 63 -99 SPO 1997 04 10 18 49 14 8.8 -9 669.60 -54.3 -54.4 -54.4 63 -99 SPO 1997 04 10 18 50 14 9.1 -9 669.60 -54.3 -54.4 -54.4 62 -99 SPO 1997 04 10 18 51 13 8.7 -9 669.60 -54.3 -54.5 -54.4 62 -99 SPO 1997 04 10 18 52 15 8.5 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 18 53 15 8.5 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 18 54 14 8.6 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 18 55 15 8.7 -9 669.60 -54.3 -54.5 -54.4 65 -99 SPO 1997 04 10 18 56 16 8.9 -9 669.60 -54.3 -54.5 -54.4 66 -99 SPO 1997 04 10 18 57 16 8.6 -9 669.60 -54.3 -54.5 -54.4 66 -99 SPO 1997 04 10 18 58 16 8.4 -9 669.70 -54.3 -54.5 -54.4 66 -99 SPO 1997 04 10 18 59 16 8.8 -9 669.60 -54.3 -54.5 -54.4 65 -99 SPO 1997 04 10 19 00 18 8.5 -9 669.60 -54.3 -54.5 -54.4 65 0 SPO 1997 04 10 19 01 18 8.4 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 02 17 8.6 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 03 18 8.9 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 04 19 8.4 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 05 18 8.7 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 06 17 8.0 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 07 15 8.7 -9 669.60 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 08 14 9.1 -9 669.60 -54.3 -54.6 -54.4 65 -99 SPO 1997 04 10 19 09 14 8.5 -9 669.60 -54.3 -54.6 -54.4 65 -99 SPO 1997 04 10 19 10 15 9.2 -9 669.50 -54.3 -54.6 -54.4 65 -99 SPO 1997 04 10 19 11 14 9.4 -9 669.50 -54.2 -54.6 -54.4 64 -99 SPO 1997 04 10 19 12 14 9.8 -9 669.50 -54.2 -54.6 -54.4 64 -99 SPO 1997 04 10 19 13 14 9.0 -9 669.50 -54.3 -54.6 -54.4 65 -99 SPO 1997 04 10 19 14 14 8.8 -9 669.50 -54.3 -54.6 -54.4 63 -99 SPO 1997 04 10 19 15 14 8.7 -9 669.50 -54.3 -54.5 -54.4 63 -99 SPO 1997 04 10 19 16 15 9.0 -9 669.50 -54.3 -54.5 -54.4 65 -99 SPO 1997 04 10 19 17 14 9.8 -9 669.50 -54.3 -54.5 -54.4 65 -99 SPO 1997 04 10 19 18 14 9.2 -9 669.40 -54.3 -54.5 -54.4 65 -99 SPO 1997 04 10 19 19 14 9.7 -9 669.40 -54.3 -54.5 -54.5 65 -99 SPO 1997 04 10 19 20 14 9.4 -9 669.50 -54.3 -54.5 -54.5 63 -99 SPO 1997 04 10 19 21 14 9.0 -9 669.50 -54.3 -54.6 -54.5 63 -99 SPO 1997 04 10 19 22 13 9.9 -9 669.40 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 10 19 23 12 9.9 -9 669.40 -54.4 -54.5 -54.5 63 -99 SPO 1997 04 10 19 24 14 9.0 -9 669.50 -54.4 -54.6 -54.5 63 -99 SPO 1997 04 10 19 25 14 9.1 -9 669.60 -54.4 -54.7 -54.5 63 -99 SPO 1997 04 10 19 26 14 8.6 -9 669.60 -54.4 -54.7 -54.5 63 -99 SPO 1997 04 10 19 27 12 9.4 -9 669.60 -54.4 -54.7 -54.6 63 -99 SPO 1997 04 10 19 28 14 9.1 -9 669.50 -54.4 -54.7 -54.6 63 -99 SPO 1997 04 10 19 29 13 9.7 -9 669.50 -54.4 -54.7 -54.6 63 -99 SPO 1997 04 10 19 30 13 9.1 -9 669.60 -54.5 -54.7 -54.6 65 -99 SPO 1997 04 10 19 31 14 9.1 -9 669.60 -54.5 -54.7 -54.6 65 -99 SPO 1997 04 10 19 32 14 9.0 -9 669.50 -54.5 -54.8 -54.6 64 -99 SPO 1997 04 10 19 33 13 10.1 -9 669.50 -54.5 -54.8 -54.6 63 -99 SPO 1997 04 10 19 34 12 9.4 -9 669.50 -54.5 -54.7 -54.6 63 -99 SPO 1997 04 10 19 35 12 9.5 -9 669.40 -54.5 -54.7 -54.6 63 -99 SPO 1997 04 10 19 36 11 9.3 -9 669.40 -54.5 -54.8 -54.7 63 -99 SPO 1997 04 10 19 37 11 9.4 -9 669.50 -54.5 -54.7 -54.7 63 -99 SPO 1997 04 10 19 38 12 8.4 -9 669.50 -54.6 -54.8 -54.7 64 -99 SPO 1997 04 10 19 39 12 8.6 -9 669.50 -54.6 -54.8 -54.7 64 -99 SPO 1997 04 10 19 40 12 9.1 -9 669.50 -54.6 -54.8 -54.7 63 -99 SPO 1997 04 10 19 41 13 9.0 -9 669.50 -54.6 -54.8 -54.7 63 -99 SPO 1997 04 10 19 42 11 9.2 -9 669.50 -54.6 -54.8 -54.7 63 -99 SPO 1997 04 10 19 43 11 8.8 -9 669.40 -54.6 -54.9 -54.7 63 -99 SPO 1997 04 10 19 44 13 9.1 -9 669.40 -54.6 -54.9 -54.7 63 -99 SPO 1997 04 10 19 45 12 8.6 -9 669.50 -54.6 -54.9 -54.7 63 -99 SPO 1997 04 10 19 46 13 8.8 -9 669.40 -54.6 -54.9 -54.7 63 -99 SPO 1997 04 10 19 47 12 9.0 -9 669.50 -54.6 -54.9 -54.7 63 -99 SPO 1997 04 10 19 48 11 9.3 -9 669.50 -54.6 -54.9 -54.7 63 -99 SPO 1997 04 10 19 49 13 8.7 -9 669.50 -54.6 -54.9 -54.8 63 -99 SPO 1997 04 10 19 50 14 8.6 -9 669.50 -54.6 -54.9 -54.8 63 -99 SPO 1997 04 10 19 51 13 9.2 -9 669.50 -54.7 -54.9 -54.8 64 -99 SPO 1997 04 10 19 52 12 9.3 -9 669.50 -54.7 -54.9 -54.8 64 -99 SPO 1997 04 10 19 53 12 9.0 -9 669.60 -54.7 -55.0 -54.8 63 -99 SPO 1997 04 10 19 54 11 9.0 -9 669.60 -54.7 -54.9 -54.9 63 -99 SPO 1997 04 10 19 55 12 8.4 -9 669.60 -54.8 -55.0 -54.9 64 -99 SPO 1997 04 10 19 56 13 8.6 -9 669.60 -54.8 -55.0 -54.9 63 -99 SPO 1997 04 10 19 57 14 8.7 -9 669.60 -54.8 -55.0 -54.9 62 -99 SPO 1997 04 10 19 58 14 8.6 -9 669.60 -54.8 -55.0 -54.9 62 -99 SPO 1997 04 10 19 59 14 8.3 -9 669.60 -54.8 -55.0 -54.9 62 -99 SPO 1997 04 10 20 00 16 8.6 -9 669.60 -54.8 -55.1 -54.9 62 0 SPO 1997 04 10 20 01 15 8.0 -9 669.60 -54.8 -55.1 -54.9 63 -99 SPO 1997 04 10 20 02 16 7.2 -9 669.60 -54.8 -55.1 -54.9 63 -99 SPO 1997 04 10 20 03 15 8.1 -9 669.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 10 20 04 17 7.8 -9 669.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 10 20 05 17 8.6 -9 669.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 10 20 06 16 8.8 -9 669.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 10 20 07 15 8.7 -9 669.60 -54.8 -55.1 -55.0 63 -99 SPO 1997 04 10 20 08 16 8.3 -9 669.60 -54.8 -55.1 -55.0 62 -99 SPO 1997 04 10 20 09 17 8.2 -9 669.60 -54.8 -55.1 -55.0 62