# number_of_header_lines: 69 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CH4 CCGG (Individual Flasks) # contact_name: Ed Dlugokencky # contact_telephone: (303) 497-6228 # contact_email: Ed.Dlugokencky@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: South African Weather Service [SAWS] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: cpt # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2020-12-31 # description_creation-time: 2021-07-30 12:29:03 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number CPT 2010 02 11 08 53 00 150-99 G ch4 CCGG 1733.790 1.310 ... H6 2010 04 08 16 16 00 -34.3523 18.4891 260.00 230.00 30.00 293400 CPT 2010 02 11 08 53 00 2332-99 G ch4 CCGG 1734.460 1.310 ... H6 2010 04 08 16 31 00 -34.3523 18.4891 260.00 230.00 30.00 293401 CPT 2010 02 18 08 57 00 4712-99 G ch4 CCGG 1733.870 1.310 ... H6 2010 04 08 16 01 00 -34.3523 18.4891 260.00 230.00 30.00 293403 CPT 2010 02 18 08 57 00 973-99 G ch4 CCGG 1733.230 1.310 ... H6 2010 04 08 15 46 00 -34.3523 18.4891 260.00 230.00 30.00 293402 CPT 2010 02 22 09 01 00 1302-99 G ch4 CCGG 1731.850 0.910 ... H11 2010 05 25 12 27 00 -34.3523 18.4891 260.00 230.00 30.00 296747 CPT 2010 02 22 09 01 00 4765-99 G ch4 CCGG 1732.200 0.910 ... H11 2010 05 25 12 42 00 -34.3523 18.4891 260.00 230.00 30.00 296748 CPT 2010 02 25 10 11 00 1-99 G ch4 CCGG 1738.730 0.910 ... H11 2010 05 25 12 57 00 -34.3523 18.4891 260.00 230.00 30.00 296749 CPT 2010 02 25 10 11 00 1061-99 G ch4 CCGG 1737.960 0.910 ... H11 2010 05 25 13 11 00 -34.3523 18.4891 260.00 230.00 30.00 296750 CPT 2010 03 10 09 50 00 4314-99 G ch4 CCGG 1734.010 1.310 ... H6 2010 04 08 15 30 00 -34.3523 18.4891 260.00 230.00 30.00 293399 CPT 2010 03 15 10 47 00 4190-99 G ch4 CCGG 1736.070 1.310 ... H6 2010 07 06 15 49 00 -34.3523 18.4891 260.00 230.00 30.00 299620 CPT 2010 03 15 10 47 00 4553-99 G ch4 CCGG 1736.940 1.310 ... H6 2010 07 06 16 04 00 -34.3523 18.4891 260.00 230.00 30.00 299621 CPT 2010 03 18 10 06 00 1467-99 G ch4 CCGG 1731.960 1.310 ... H6 2010 07 06 15 34 00 -34.3523 18.4891 260.00 230.00 30.00 299623 CPT 2010 03 18 10 06 00 409-99 G ch4 CCGG 1736.270 1.310 ... H6 2010 07 06 15 19 00 -34.3523 18.4891 260.00 230.00 30.00 299622 CPT 2010 03 29 10 15 00 1321-99 G ch4 CCGG 1736.560 1.310 ... H6 2010 05 17 13 14 00 -34.3523 18.4891 260.00 230.00 30.00 296272 CPT 2010 03 29 10 15 00 3893-99 G ch4 CCGG 1735.250 1.310 ... H6 2010 05 17 13 29 00 -34.3523 18.4891 260.00 230.00 30.00 296273 CPT 2010 04 01 08 17 00 1410-99 G ch4 CCGG 1743.500 1.310 ... H6 2010 05 17 14 00 00 -34.3523 18.4891 260.00 230.00 30.00 296275 CPT 2010 04 01 08 17 00 264-99 G ch4 CCGG 1742.430 1.310 ... H6 2010 05 17 13 45 00 -34.3523 18.4891 260.00 230.00 30.00 296274 CPT 2010 04 06 09 05 00 2393-99 G ch4 CCGG 1741.790 1.310 ... H6 2010 06 16 12 10 00 -34.3523 18.4891 260.00 230.00 30.00 298350 CPT 2010 04 06 09 05 00 4112-99 G ch4 CCGG 1743.980 1.310 ... H6 2010 06 16 12 25 00 -34.3523 18.4891 260.00 230.00 30.00 298351 CPT 2010 04 15 10 59 00 1296-99 G ch4 CCGG 1739.620 1.310 ... H6 2010 06 16 11 55 00 -34.3523 18.4891 260.00 230.00 30.00 298353 CPT 2010 04 15 10 59 00 1592-99 G ch4 CCGG 1738.140 1.310 ... H6 2010 06 16 11 39 00 -34.3523 18.4891 260.00 230.00 30.00 298352 CPT 2010 04 28 10 02 00 2084-99 G ch4 CCGG 1744.570 1.310 ... H6 2010 06 16 11 09 00 -34.3523 18.4891 260.00 230.00 30.00 298346 CPT 2010 04 28 10 02 00 4613-99 G ch4 CCGG 1742.890 1.310 ... H6 2010 06 16 11 24 00 -34.3523 18.4891 260.00 230.00 30.00 298347 CPT 2010 05 07 08 30 00 183-99 G ch4 CCGG 1743.020 1.310 ... H6 2010 06 16 10 38 00 -34.3523 18.4891 260.00 230.00 30.00 298348 CPT 2010 05 07 08 30 00 735-99 G ch4 CCGG 1741.790 1.310 ... H6 2010 06 16 10 53 00 -34.3523 18.4891 260.00 230.00 30.00 298349 CPT 2010 05 24 11 13 00 4051-99 G ch4 CCGG 1747.920 1.310 ... H6 2010 07 27 13 11 00 -34.3523 18.4891 260.00 230.00 30.00 300883 CPT 2010 05 24 11 13 00 807-99 G ch4 CCGG 1747.140 1.310 ... H6 2010 07 27 12 56 00 -34.3523 18.4891 260.00 230.00 30.00 300882 CPT 2010 05 31 08 14 00 1699-99 G ch4 CCGG 1754.800 1.310 ... H6 2010 07 27 13 27 00 -34.3523 18.4891 260.00 230.00 30.00 300880 CPT 2010 05 31 08 14 00 4331-99 G ch4 CCGG 1753.560 1.310 ... H6 2010 07 27 13 42 00 -34.3523 18.4891 260.00 230.00 30.00 300881 CPT 2010 06 10 09 22 00 2402-99 G ch4 CCGG 1758.500 0.910 ... H11 2010 07 30 09 43 00 -34.3523 18.4891 260.00 230.00 30.00 300872 CPT 2010 06 10 09 22 00 4967-99 G ch4 CCGG 1757.660 0.910 ... H11 2010 07 30 09 57 00 -34.3523 18.4891 260.00 230.00 30.00 300873 CPT 2010 06 14 09 47 00 1113-99 G ch4 CCGG 1752.960 0.910 ... H11 2010 07 30 09 14 00 -34.3523 18.4891 260.00 230.00 30.00 300870 CPT 2010 06 14 09 47 00 2865-99 G ch4 CCGG 1752.900 0.910 ... H11 2010 07 30 09 28 00 -34.3523 18.4891 260.00 230.00 30.00 300871 CPT 2010 06 25 09 06 00 3019-99 G ch4 CCGG 1761.940 0.910 ... H11 2010 07 29 15 18 00 -34.3523 18.4891 260.00 230.00 30.00 300866 CPT 2010 06 25 09 06 00 3968-99 G ch4 CCGG 1760.260 0.910 ... H11 2010 07 29 15 32 00 -34.3523 18.4891 260.00 230.00 30.00 300867 CPT 2010 07 01 06 35 00 3833-99 G ch4 CCGG 1766.390 0.910 ... H11 2010 07 29 16 02 00 -34.3523 18.4891 260.00 230.00 30.00 300869 CPT 2010 07 01 06 35 00 785-99 G ch4 CCGG 1766.460 0.910 ... H11 2010 07 29 15 47 00 -34.3523 18.4891 260.00 230.00 30.00 300868 CPT 2010 07 06 07 40 00 1247-99 G ch4 CCGG 1759.910 1.310 ... H6 2010 09 09 11 42 00 -34.3523 18.4891 260.00 230.00 30.00 303298 CPT 2010 07 06 07 40 00 923-99 G ch4 CCGG 1758.540 1.310 ... H6 2010 09 09 11 27 00 -34.3523 18.4891 260.00 230.00 30.00 303297 CPT 2010 07 15 11 28 00 2789-99 G ch4 CCGG 1759.420 1.310 ... H6 2010 09 09 11 12 00 -34.3523 18.4891 260.00 230.00 30.00 303296 CPT 2010 07 15 11 28 00 947-99 G ch4 CCGG 1759.960 1.310 ... H6 2010 09 09 10 57 00 -34.3523 18.4891 260.00 230.00 30.00 303295 CPT 2010 07 29 08 50 00 1321-99 G ch4 CCGG 1764.650 1.310 ... H6 2010 09 07 14 54 00 -34.3523 18.4891 260.00 230.00 30.00 303217 CPT 2010 07 29 08 50 00 2888-99 G ch4 CCGG 1764.300 1.310 ... H6 2010 09 07 15 09 00 -34.3523 18.4891 260.00 230.00 30.00 303218 CPT 2010 08 10 08 52 00 4572-99 G ch4 CCGG 1774.100 1.310 ... H6 2010 09 07 14 23 00 -34.3523 18.4891 260.00 230.00 30.00 303219 CPT 2010 08 10 08 52 00 5220-99 G ch4 CCGG 1772.810 1.310 ... H6 2010 09 07 14 38 00 -34.3523 18.4891 260.00 230.00 30.00 303220 CPT 2010 08 16 09 12 00 409-99 G ch4 CCGG 1773.800 1.310 ... H6 2010 10 26 12 40 00 -34.3523 18.4891 260.00 230.00 30.00 306341 CPT 2010 08 16 09 12 00 4219-99 G ch4 CCGG 1773.350 1.310 ... H6 2010 10 26 12 55 00 -34.3523 18.4891 260.00 230.00 30.00 306342 CPT 2010 08 23 08 38 00 1760-99 G ch4 CCGG 1768.400 1.310 ... H6 2010 10 26 13 11 00 -34.3523 18.4891 260.00 230.00 30.00 306343 CPT 2010 08 23 08 38 00 3644-99 G ch4 CCGG 1768.120 1.310 ... H6 2010 10 26 13 26 00 -34.3523 18.4891 260.00 230.00 30.00 306344 CPT 2010 09 02 10 57 00 4190-99 G ch4 CCGG 1776.380 1.310 ... H6 2010 10 25 13 32 00 -34.3523 18.4891 260.00 230.00 30.00 306274 CPT 2010 09 02 10 57 00 743-99 G ch4 CCGG 1775.430 1.310 ... H6 2010 10 25 13 17 00 -34.3523 18.4891 260.00 230.00 30.00 306273 CPT 2010 09 06 08 35 00 1407-99 G ch4 CCGG 1768.910 1.310 ... H6 2010 10 25 13 47 00 -34.3523 18.4891 260.00 230.00 30.00 306271 CPT 2010 09 06 08 35 00 1467-99 G ch4 CCGG 1770.340 1.310 ... H6 2010 10 25 14 02 00 -34.3523 18.4891 260.00 230.00 30.00 306272 CPT 2010 09 16 08 54 00 1246-99 G ch4 CCGG 1765.700 1.310 ... H6 2010 10 26 13 41 00 -34.3523 18.4891 260.00 230.00 30.00 306347 CPT 2010 09 16 08 54 00 4616-99 G ch4 CCGG 1768.910 1.310 ... H6 2010 10 26 13 56 00 -34.3523 18.4891 260.00 230.00 30.00 306348 CPT 2010 09 23 08 39 00 1069-99 G ch4 CCGG 1767.670 1.310 ... H6 2010 10 26 14 12 00 -34.3523 18.4891 260.00 230.00 30.00 306345 CPT 2010 09 23 08 39 00 4740-99 G ch4 CCGG 1767.940 1.310 ... H6 2010 10 26 14 27 00 -34.3523 18.4891 260.00 230.00 30.00 306346 CPT 2010 09 30 09 10 00 3744-99 G ch4 CCGG 1767.390 1.310 ... H6 2010 10 25 14 18 00 -34.3523 18.4891 260.00 230.00 30.00 306275 CPT 2010 09 30 09 10 00 3811-99 G ch4 CCGG 1766.950 1.310 ... H6 2010 10 25 14 33 00 -34.3523 18.4891 260.00 230.00 30.00 306276 CPT 2010 10 04 09 01 00 2331-99 G ch4 CCGG 1766.610 1.310 ... H6 2010 10 25 14 48 00 -34.3523 18.4891 260.00 230.00 30.00 306278 CPT 2010 10 04 09 01 00 3700-99 G ch4 CCGG 1768.200 1.310 ... H6 2010 10 25 15 03 00 -34.3523 18.4891 260.00 230.00 30.00 306277 CPT 2010 10 18 11 04 00 2283-99 G ch4 CCGG 1765.280 1.310 ... H6 2010 12 22 15 10 00 -34.3523 18.4891 260.00 230.00 30.00 309501 CPT 2010 10 18 11 04 00 333-99 G ch4 CCGG 1765.720 1.310 ... H6 2010 12 22 14 54 00 -34.3523 18.4891 260.00 230.00 30.00 309502 CPT 2010 10 25 08 30 00 2005-99 G ch4 CCGG 1765.710 1.310 ... H6 2010 12 22 14 22 00 -34.3523 18.4891 260.00 230.00 30.00 309499 CPT 2010 10 25 08 30 00 2835-99 G ch4 CCGG 1766.480 1.310 ... H6 2010 12 22 14 38 00 -34.3523 18.4891 260.00 230.00 30.00 309500 CPT 2010 11 01 08 32 00 2804-99 G ch4 CCGG 1767.170 1.310 ... H6 2010 12 28 10 40 00 -34.3523 18.4891 260.00 230.00 30.00 309953 CPT 2010 11 01 08 32 00 3616-99 G ch4 CCGG 1767.600 1.310 ... H6 2010 12 28 10 56 00 -34.3523 18.4891 260.00 230.00 30.00 309954 CPT 2010 11 08 09 32 00 239-99 G ch4 CCGG 1766.680 1.310 ... H6 2010 12 28 09 35 00 -34.3523 18.4891 260.00 230.00 30.00 309951 CPT 2010 11 08 09 32 00 3036-99 G ch4 CCGG 1767.670 1.310 ... H6 2010 12 28 09 51 00 -34.3523 18.4891 260.00 230.00 30.00 309952 CPT 2010 11 15 09 00 00 1699-99 G ch4 CCGG 1765.040 1.310 ... H6 2010 12 27 11 33 00 -34.3523 18.4891 260.00 230.00 30.00 309750 CPT 2010 11 15 09 00 00 3860-99 G ch4 CCGG 1763.500 1.310 ... H6 2010 12 27 11 49 00 -34.3523 18.4891 260.00 230.00 30.00 309751 CPT 2010 11 22 08 59 00 4051-99 G ch4 CCGG 1770.910 1.310 ... H6 2010 12 27 11 17 00 -34.3523 18.4891 260.00 230.00 30.00 309752 CPT 2010 11 22 08 59 00 733-99 G ch4 CCGG 1770.410 1.310 ... H6 2010 12 27 11 00 00 -34.3523 18.4891 260.00 230.00 30.00 309753 CPT 2010 11 30 09 01 00 1855-99 G ch4 CCGG 1758.090 1.310 ... H6 2011 02 24 10 46 00 -34.3523 18.4891 260.00 230.00 30.00 312931 CPT 2010 11 30 09 01 00 2679-99 G ch4 CCGG 1759.030 1.310 ... H6 2011 02 24 11 02 00 -34.3523 18.4891 260.00 230.00 30.00 312932 CPT 2010 12 02 08 59 00 1472-99 G ch4 CCGG 1759.070 1.310 ... H6 2011 02 24 11 19 00 -34.3523 18.4891 260.00 230.00 30.00 312933 CPT 2010 12 02 08 59 00 1592-99 G ch4 CCGG 1757.450 1.310 ... H6 2011 02 24 11 35 00 -34.3523 18.4891 260.00 230.00 30.00 312934 CPT 2010 12 06 08 59 00 2830-99 G ch4 CCGG 1758.850 0.910 ... H11 2011 02 28 15 24 00 -34.3523 18.4891 260.00 230.00 30.00 312939 CPT 2010 12 06 08 59 00 4326-99 G ch4 CCGG 1760.160 0.910 ... H11 2011 02 28 15 39 00 -34.3523 18.4891 260.00 230.00 30.00 312940 CPT 2010 12 13 09 37 00 2300-99 G ch4 CCGG 1754.360 1.310 ... H6 2011 02 25 15 07 00 -34.3523 18.4891 260.00 230.00 30.00 312941 CPT 2010 12 13 09 37 00 5113-99 G ch4 CCGG 1753.770 1.310 ... H6 2011 02 25 16 47 00 -34.3523 18.4891 260.00 230.00 30.00 312944 CPT 2010 12 27 05 05 00 2764-99 G ch4 CCGG 1750.240 1.310 ... H6 2011 02 25 16 31 00 -34.3523 18.4891 260.00 230.00 30.00 312943 CPT 2010 12 27 05 05 00 73-99 G ch4 CCGG 1749.270 1.310 ... H6 2011 02 25 16 15 00 -34.3523 18.4891 260.00 230.00 30.00 312942 CPT 2011 01 10 09 00 00 3254-99 G ch4 CCGG 1747.880 1.310 ... H6 2011 02 28 11 07 00 -34.3523 18.4891 260.00 230.00 30.00 312947 CPT 2011 01 10 09 00 00 460-99 G ch4 CCGG 1747.770 1.310 ... H6 2011 02 28 10 51 00 -34.3523 18.4891 260.00 230.00 30.00 312946 CPT 2011 01 17 08 56 00 2691-99 G ch4 CCGG 1750.530 1.310 ... H6 2011 02 25 17 03 00 -34.3523 18.4891 260.00 230.00 30.00 312945 CPT 2011 01 17 09 31 00 4104-99 G ch4 CCGG 1744.530 1.310 ... H6 2011 02 28 11 23 00 -34.3523 18.4891 260.00 230.00 30.00 312948 CPT 2011 01 17 09 31 00 4407-99 G ch4 CCGG 1745.520 1.310 ... H6 2011 02 28 11 40 00 -34.3523 18.4891 260.00 230.00 30.00 312949 CPT 2011 01 24 09 29 00 3766-99 G ch4 CCGG 1744.090 1.310 ... H6 2011 04 28 11 52 00 -34.3523 18.4891 260.00 230.00 30.00 316496 CPT 2011 01 24 09 29 00 4731-99 G ch4 CCGG 1742.010 1.310 ... H6 2011 04 28 12 08 00 -34.3523 18.4891 260.00 230.00 30.00 316497 CPT 2011 01 31 08 30 00 1237-99 G ch4 CCGG 1742.870 1.310 ... H6 2011 04 28 12 24 00 -34.3523 18.4891 260.00 230.00 30.00 316494 CPT 2011 01 31 08 30 00 2887-99 G ch4 CCGG 1745.420 1.310 ... H6 2011 04 28 12 40 00 -34.3523 18.4891 260.00 230.00 30.00 316495 CPT 2011 02 14 09 02 00 1464-99 G ch4 CCGG 1757.260 1.310 .X. H6 2011 04 26 13 28 00 -34.3523 18.4891 260.00 230.00 30.00 316502 CPT 2011 02 14 09 02 00 4322-99 G ch4 CCGG 1756.760 1.310 .X. H6 2011 04 26 13 44 00 -34.3523 18.4891 260.00 230.00 30.00 316503 CPT 2011 02 21 08 30 00 2798-99 G ch4 CCGG 1741.270 1.310 ... H6 2011 04 26 14 01 00 -34.3523 18.4891 260.00 230.00 30.00 316504 CPT 2011 02 21 08 30 00 3895-99 G ch4 CCGG 1742.850 1.310 ... H6 2011 04 26 14 17 00 -34.3523 18.4891 260.00 230.00 30.00 316505 CPT 2011 02 28 08 32 00 1101-99 G ch4 CCGG 1744.300 1.310 ... H6 2011 04 26 15 41 00 -34.3523 18.4891 260.00 230.00 30.00 316478 CPT 2011 02 28 08 32 00 2526-99 G ch4 CCGG 1743.330 1.310 ... H6 2011 04 26 15 57 00 -34.3523 18.4891 260.00 230.00 30.00 316479 CPT 2011 03 14 08 30 00 1765-99 G ch4 CCGG 1748.300 1.310 ... H6 2011 04 26 16 14 00 -34.3523 18.4891 260.00 230.00 30.00 316476 CPT 2011 03 14 08 30 00 2879-99 G ch4 CCGG 1748.170 1.310 ... H6 2011 04 26 16 30 00 -34.3523 18.4891 260.00 230.00 30.00 316477 CPT 2011 03 17 08 35 00 2173-99 G ch4 CCGG 1747.230 0.910 ... H11 2011 05 23 14 46 00 -34.3523 18.4891 260.00 230.00 30.00 318046 CPT 2011 03 17 08 35 00 2562-99 G ch4 CCGG 1747.390 0.910 ... H11 2011 05 23 15 02 00 -34.3523 18.4891 260.00 230.00 30.00 318047 CPT 2011 03 24 12 00 00 1082-99 G ch4 CCGG 1748.530 0.910 ... H11 2011 05 23 14 16 00 -34.3523 18.4891 260.00 230.00 30.00 318044 CPT 2011 03 24 12 00 00 3042-99 G ch4 CCGG 1748.220 0.910 ... H11 2011 05 23 14 31 00 -34.3523 18.4891 260.00 230.00 30.00 318045 CPT 2011 04 26 08 43 00 1841-99 G ch4 CCGG 1746.770 0.910 ... H11 2011 05 24 15 45 00 -34.3523 18.4891 260.00 230.00 30.00 318054 CPT 2011 04 26 08 43 00 4377-99 G ch4 CCGG 1747.650 0.910 ... H11 2011 05 24 16 01 00 -34.3523 18.4891 260.00 230.00 30.00 318055 CPT 2011 04 26 08 53 00 2783-99 G ch4 CCGG 1746.860 0.910 ... H11 2011 05 24 15 15 00 -34.3523 18.4891 260.00 230.00 30.00 318052 CPT 2011 04 26 08 53 00 4183-99 G ch4 CCGG 1747.390 0.910 ... H11 2011 05 24 15 30 00 -34.3523 18.4891 260.00 230.00 30.00 318053 CPT 2011 04 29 09 00 00 2974-99 G ch4 CCGG 1772.740 0.910 .X. H11 2011 05 24 12 42 00 -34.3523 18.4891 260.00 230.00 30.00 318068 CPT 2011 04 29 09 00 00 3227-99 G ch4 CCGG 1772.240 0.910 .X. H11 2011 05 24 12 57 00 -34.3523 18.4891 260.00 230.00 30.00 318069 CPT 2011 04 29 11 32 00 1315-99 G ch4 CCGG 1755.990 0.910 ... H11 2011 05 24 12 11 00 -34.3523 18.4891 260.00 230.00 30.00 318070 CPT 2011 04 29 11 32 00 2459-99 G ch4 CCGG 1756.800 0.910 ... H11 2011 05 24 12 26 00 -34.3523 18.4891 260.00 230.00 30.00 318071 CPT 2011 05 03 12 34 56 772-99 G ch4 CCGG 1790.080 1.310 .X. H6 2011 08 05 09 57 00 -34.3523 18.4891 260.00 230.00 30.00 321644 CPT 2011 05 03 12 34 56 846-99 G ch4 CCGG 1789.290 1.310 .X. H6 2011 08 05 10 13 00 -34.3523 18.4891 260.00 230.00 30.00 321645 CPT 2011 05 09 10 57 00 1859-99 G ch4 CCGG 1809.220 1.310 .X. H6 2011 08 05 10 46 00 -34.3523 18.4891 260.00 230.00 30.00 321647 CPT 2011 05 09 10 57 00 317-99 G ch4 CCGG 1810.250 1.310 .X. H6 2011 08 05 10 29 00 -34.3523 18.4891 260.00 230.00 30.00 321646 CPT 2011 05 19 08 33 00 2100-99 G ch4 CCGG 1759.920 0.910 ... H11 2011 08 08 13 06 00 -34.3523 18.4891 260.00 230.00 30.00 321706 CPT 2011 05 19 08 33 00 4566-99 G ch4 CCGG 1759.000 0.910 ... H11 2011 08 08 13 21 00 -34.3523 18.4891 260.00 230.00 30.00 321707 CPT 2011 05 23 09 31 00 320-99 G ch4 CCGG 1756.850 0.910 ... H11 2011 08 08 12 36 00 -34.3523 18.4891 260.00 230.00 30.00 321708 CPT 2011 05 23 09 31 00 4265-99 G ch4 CCGG 1757.840 0.910 ... H11 2011 08 08 12 51 00 -34.3523 18.4891 260.00 230.00 30.00 321709 CPT 2011 06 09 09 17 00 1136-99 G ch4 CCGG 1762.600 1.310 ... H6 2011 08 04 17 30 00 -34.3523 18.4891 260.00 230.00 30.00 321657 CPT 2011 06 09 09 17 00 663-99 G ch4 CCGG 1764.150 1.310 ... H6 2011 08 04 17 14 00 -34.3523 18.4891 260.00 230.00 30.00 321656 CPT 2011 06 16 08 05 00 1699-99 G ch4 CCGG 1761.810 1.310 ... H6 2011 08 05 09 41 00 -34.3523 18.4891 260.00 230.00 30.00 321659 CPT 2011 06 16 08 05 00 35-99 G ch4 CCGG 1762.790 1.310 ... H6 2011 08 05 09 24 00 -34.3523 18.4891 260.00 230.00 30.00 321658 CPT 2011 06 23 09 28 00 2757-99 G ch4 CCGG 1765.630 1.310 ... H6 2011 08 04 16 09 00 -34.3523 18.4891 260.00 230.00 30.00 321652 CPT 2011 06 23 09 28 00 3670-99 G ch4 CCGG 1763.670 1.310 ... H6 2011 08 04 16 25 00 -34.3523 18.4891 260.00 230.00 30.00 321653 CPT 2011 06 27 09 01 00 1026-99 G ch4 CCGG 1768.980 1.310 ... H6 2011 08 04 16 41 00 -34.3523 18.4891 260.00 230.00 30.00 321654 CPT 2011 06 27 09 01 00 3930-99 G ch4 CCGG 1766.150 1.310 ... H6 2011 08 04 16 57 00 -34.3523 18.4891 260.00 230.00 30.00 321655 CPT 2011 07 04 09 00 00 1452-99 G ch4 CCGG 1767.520 0.910 ... H11 2011 09 14 16 38 00 -34.3523 18.4891 260.00 230.00 30.00 323534 CPT 2011 07 04 09 00 00 2777-99 G ch4 CCGG 1768.350 0.910 ... H11 2011 09 14 16 53 00 -34.3523 18.4891 260.00 230.00 30.00 323535 CPT 2011 07 22 08 17 00 2585-99 G ch4 CCGG 1779.640 0.910 ... H11 2011 09 14 17 24 00 -34.3523 18.4891 260.00 230.00 30.00 323537 CPT 2011 07 22 08 17 00 567-99 G ch4 CCGG 1780.050 0.910 ... H11 2011 09 14 17 08 00 -34.3523 18.4891 260.00 230.00 30.00 323536 CPT 2011 07 28 09 00 00 1196-99 G ch4 CCGG 1868.080 0.910 N.. H11 2011 09 20 11 53 00 -34.3523 18.4891 260.00 230.00 30.00 323877 CPT 2011 07 28 09 00 00 4751-99 G ch4 CCGG 1869.840 0.910 N.. H11 2011 09 20 12 08 00 -34.3523 18.4891 260.00 230.00 30.00 323878 CPT 2011 08 01 09 33 00 2503-99 G ch4 CCGG 1793.920 0.910 .X. H11 2011 09 20 11 22 00 -34.3523 18.4891 260.00 230.00 30.00 323879 CPT 2011 08 01 09 33 00 4917-99 G ch4 CCGG 1793.430 0.910 .X. H11 2011 09 20 11 37 00 -34.3523 18.4891 260.00 230.00 30.00 323880 CPT 2011 08 08 08 35 00 1450-99 G ch4 CCGG 1973.690 1.310 N.. H6 2011 10 04 16 22 00 -34.3523 18.4891 260.00 230.00 30.00 324464 CPT 2011 08 08 08 35 00 4511-99 G ch4 CCGG 1973.580 1.310 N.. H6 2011 10 04 16 39 00 -34.3523 18.4891 260.00 230.00 30.00 324465 CPT 2011 08 25 09 00 00 1994-99 G ch4 CCGG 1777.030 1.310 ... H6 2011 10 04 15 50 00 -34.3523 18.4891 260.00 230.00 30.00 324462 CPT 2011 08 25 09 00 00 5267-99 G ch4 CCGG 1780.760 1.310 ... H6 2011 10 04 16 06 00 -34.3523 18.4891 260.00 230.00 30.00 324463 CPT 2011 09 03 09 01 00 2394-99 G ch4 CCGG 1775.890 1.310 ... H6 2011 10 06 15 14 00 -34.3523 18.4891 260.00 230.00 30.00 324744 CPT 2011 09 03 09 01 00 2821-99 G ch4 CCGG 1770.910 1.310 ... H6 2011 10 06 15 30 00 -34.3523 18.4891 260.00 230.00 30.00 324745 CPT 2011 09 15 08 30 00 3087-99 G ch4 CCGG 1774.080 0.910 ... H11 2011 10 06 15 08 00 -34.3523 18.4891 260.00 230.00 30.00 324746 CPT 2011 09 15 08 30 00 3096-99 G ch4 CCGG 1775.150 0.910 ... H11 2011 10 06 15 24 00 -34.3523 18.4891 260.00 230.00 30.00 324747 CPT 2011 09 19 09 10 00 3732-99 G ch4 CCGG 1773.750 0.910 ... H11 2011 12 01 11 55 00 -34.3523 18.4891 260.00 230.00 30.00 327112 CPT 2011 09 19 09 10 00 424-99 G ch4 CCGG 1773.950 0.910 ... H11 2011 12 01 11 40 00 -34.3523 18.4891 260.00 230.00 30.00 327113 CPT 2011 09 26 09 47 00 1889-99 G ch4 CCGG 1773.090 0.910 ... H11 2011 12 07 13 58 00 -34.3523 18.4891 260.00 230.00 30.00 327114 CPT 2011 10 10 10 04 00 2504-99 G ch4 CCGG 1778.830 0.910 ... H11 2011 12 06 15 46 00 -34.3523 18.4891 260.00 230.00 30.00 327322 CPT 2011 10 10 10 04 00 3128-99 G ch4 CCGG 1777.930 0.910 ... H11 2011 12 06 16 01 00 -34.3523 18.4891 260.00 230.00 30.00 327321 CPT 2011 10 20 08 31 00 2395-99 G ch4 CCGG 1770.750 0.910 ... H11 2011 12 06 15 15 00 -34.3523 18.4891 260.00 230.00 30.00 327323 CPT 2011 10 20 08 31 00 4837-99 G ch4 CCGG 1770.110 0.910 ... H11 2011 12 06 15 30 00 -34.3523 18.4891 260.00 230.00 30.00 327324 CPT 2011 10 24 09 00 00 1495-99 G ch4 CCGG 1770.660 0.910 ... H11 2011 12 27 14 56 00 -34.3523 18.4891 260.00 230.00 30.00 328331 CPT 2011 10 24 09 00 00 1751-99 G ch4 CCGG 1769.900 0.910 ... H11 2011 12 27 15 11 00 -34.3523 18.4891 260.00 230.00 30.00 328332 CPT 2011 10 31 09 13 00 1318-99 G ch4 CCGG 1772.480 1.310 ... H6 2011 12 28 09 14 00 -34.3523 18.4891 260.00 230.00 30.00 328333 CPT 2011 10 31 09 13 00 1486-99 G ch4 CCGG 1773.150 1.310 ... H6 2011 12 28 09 30 00 -34.3523 18.4891 260.00 230.00 30.00 328334 CPT 2011 11 10 10 37 00 1017-99 G ch4 CCGG 1769.410 0.910 ... H11 2011 12 27 13 55 00 -34.3523 18.4891 260.00 230.00 30.00 328327 CPT 2011 11 10 10 37 00 1145-99 G ch4 CCGG 1767.380 0.910 ... H11 2011 12 27 14 10 00 -34.3523 18.4891 260.00 230.00 30.00 328328 CPT 2011 11 21 12 01 00 148-99 G ch4 CCGG 1765.490 0.910 ... H11 2011 12 27 14 26 00 -34.3523 18.4891 260.00 230.00 30.00 328329 CPT 2011 11 21 12 01 00 1591-99 G ch4 CCGG 1765.950 0.910 ... H11 2011 12 27 14 41 00 -34.3523 18.4891 260.00 230.00 30.00 328330 CPT 2011 11 28 10 11 00 253-99 G ch4 CCGG 1764.000 1.310 ... H6 2012 02 02 11 17 00 -34.3523 18.4891 260.00 230.00 30.00 330432 CPT 2011 11 28 10 11 00 897-99 G ch4 CCGG 1763.790 1.310 ... H6 2012 02 02 11 34 00 -34.3523 18.4891 260.00 230.00 30.00 330433 CPT 2011 12 08 10 45 00 2921-99 G ch4 CCGG 1764.730 1.310 ... H6 2012 02 01 15 51 00 -34.3523 18.4891 260.00 230.00 30.00 330434 CPT 2011 12 08 10 45 00 3844-99 G ch4 CCGG 1764.620 1.310 ... H6 2012 02 01 16 07 00 -34.3523 18.4891 260.00 230.00 30.00 330435 CPT 2011 12 15 10 03 00 2824-99 G ch4 CCGG 1758.880 1.310 ... H6 2012 02 02 12 22 00 -34.3523 18.4891 260.00 230.00 30.00 330426 CPT 2011 12 15 10 03 00 3785-99 G ch4 CCGG 1759.370 1.310 ... H6 2012 02 02 12 38 00 -34.3523 18.4891 260.00 230.00 30.00 330427 CPT 2011 12 19 09 11 00 1837-99 G ch4 CCGG 1758.230 1.310 ... H6 2012 02 02 12 06 00 -34.3523 18.4891 260.00 230.00 30.00 330425 CPT 2011 12 19 09 11 00 704-99 G ch4 CCGG 1758.140 1.310 ... H6 2012 02 02 11 50 00 -34.3523 18.4891 260.00 230.00 30.00 330424 CPT 2011 12 29 06 45 00 490-99 G ch4 CCGG 1753.720 0.910 ... H11 2012 02 02 12 58 00 -34.3523 18.4891 260.00 230.00 30.00 330430 CPT 2011 12 29 06 45 00 5069-99 G ch4 CCGG 1755.620 0.910 ... H11 2012 02 02 12 43 00 -34.3523 18.4891 260.00 230.00 30.00 330431 CPT 2012 01 12 08 37 00 4046-99 G ch4 CCGG 1757.860 0.910 ... H11 2012 02 02 12 13 00 -34.3523 18.4891 260.00 230.00 30.00 330428 CPT 2012 01 12 08 37 00 4237-99 G ch4 CCGG 1759.190 0.910 ... H11 2012 02 02 12 28 00 -34.3523 18.4891 260.00 230.00 30.00 330429 CPT 2012 01 23 10 31 00 2272-99 G ch4 CCGG 1750.430 0.910 ... H11 2012 03 29 09 49 00 -34.3523 18.4891 260.00 230.00 30.00 333114 CPT 2012 01 23 10 31 00 4010-99 G ch4 CCGG 1748.920 0.910 ... H11 2012 03 29 10 04 00 -34.3523 18.4891 260.00 230.00 30.00 333115 CPT 2012 02 02 10 00 00 3116-99 G ch4 CCGG 1743.470 0.910 ... H11 2012 03 29 10 35 00 -34.3523 18.4891 260.00 230.00 30.00 333117 CPT 2012 02 02 10 00 00 460-99 G ch4 CCGG 1743.390 0.910 ... H11 2012 03 29 10 20 00 -34.3523 18.4891 260.00 230.00 30.00 333116 CPT 2012 02 20 11 50 00 2139-99 G ch4 CCGG 1742.080 0.910 ... H11 2012 03 27 10 18 00 -34.3523 18.4891 260.00 230.00 30.00 333167 CPT 2012 02 20 11 50 00 4619-99 G ch4 CCGG 1741.100 0.910 ... H11 2012 03 27 10 33 00 -34.3523 18.4891 260.00 230.00 30.00 333168 CPT 2012 03 01 11 27 00 4430-99 G ch4 CCGG 1745.990 0.910 ... H11 2012 03 27 09 47 00 -34.3523 18.4891 260.00 230.00 30.00 333169 CPT 2012 03 01 11 27 00 4860-99 G ch4 CCGG 1745.100 0.910 ... H11 2012 03 27 10 02 00 -34.3523 18.4891 260.00 230.00 30.00 333170 CPT 2012 03 05 09 51 00 1003-99 G ch4 CCGG 1747.500 1.310 ... H6 2012 05 30 11 03 00 -34.3523 18.4891 260.00 230.00 30.00 336015 CPT 2012 03 05 09 51 00 516-99 G ch4 CCGG 1747.130 1.310 ... H6 2012 05 30 10 47 00 -34.3523 18.4891 260.00 230.00 30.00 336014 CPT 2012 03 15 09 30 00 3452-99 G ch4 CCGG 1752.010 1.310 ... H6 2012 05 30 11 19 00 -34.3523 18.4891 260.00 230.00 30.00 336012 CPT 2012 03 15 09 30 00 4556-99 G ch4 CCGG 1751.720 1.310 ... H6 2012 05 30 11 35 00 -34.3523 18.4891 260.00 230.00 30.00 336013 CPT 2012 03 27 11 17 00 3408-99 G ch4 CCGG 1748.430 1.310 ... H6 2012 05 30 09 09 00 -34.3523 18.4891 260.00 230.00 30.00 336022 CPT 2012 03 27 11 17 00 5176-99 G ch4 CCGG 1747.540 1.310 ... H6 2012 05 30 09 26 00 -34.3523 18.4891 260.00 230.00 30.00 336023 CPT 2012 04 19 15 02 00 1153-99 G ch4 CCGG 1754.930 1.310 ... H6 2012 05 29 15 22 00 -34.3523 18.4891 260.00 230.00 30.00 336031 CPT 2012 04 19 15 02 00 3567-99 G ch4 CCGG 1755.490 1.310 ... H6 2012 05 29 15 06 00 -34.3523 18.4891 260.00 230.00 30.00 336030 CPT 2012 04 23 10 35 00 1245-99 G ch4 CCGG 1753.170 1.310 ... H6 2012 05 29 14 31 00 -34.3523 18.4891 260.00 230.00 30.00 336028 CPT 2012 04 23 10 35 00 2691-99 G ch4 CCGG 1754.150 1.310 ... H6 2012 05 29 14 47 00 -34.3523 18.4891 260.00 230.00 30.00 336029 CPT 2012 05 14 10 15 00 1086-99 G ch4 CCGG 1758.870 1.310 ... H6 2012 05 29 16 43 00 -34.3523 18.4891 260.00 230.00 30.00 336020 CPT 2012 05 14 10 15 00 2721-99 G ch4 CCGG 1759.070 1.310 ... H6 2012 05 29 16 59 00 -34.3523 18.4891 260.00 230.00 30.00 336021 CPT 2012 06 07 10 50 00 4739-99 G ch4 CCGG 1763.190 0.910 ... H11 2012 08 07 12 31 00 -34.3523 18.4891 260.00 230.00 30.00 338904 CPT 2012 06 07 10 50 00 688-99 G ch4 CCGG 1762.950 0.910 ... H11 2012 08 07 12 15 00 -34.3523 18.4891 260.00 230.00 30.00 338903 CPT 2012 06 25 09 29 00 409-99 G ch4 CCGG 1771.750 0.910 ... H11 2012 08 07 12 46 00 -34.3523 18.4891 260.00 230.00 30.00 338905 CPT 2012 06 25 09 29 00 4672-99 G ch4 CCGG 1771.570 0.910 ... H11 2012 08 07 13 01 00 -34.3523 18.4891 260.00 230.00 30.00 338906 CPT 2012 07 09 09 42 00 2590-99 G ch4 CCGG 1782.450 0.910 ... H11 2012 09 06 16 28 00 -34.3523 18.4891 260.00 230.00 30.00 340438 CPT 2012 07 09 09 42 00 5172-99 G ch4 CCGG 1781.510 0.910 ... H11 2012 09 06 16 43 00 -34.3523 18.4891 260.00 230.00 30.00 340439 CPT 2012 07 17 10 47 00 2829-99 G ch4 CCGG 1781.290 0.910 ... H11 2012 09 06 15 57 00 -34.3523 18.4891 260.00 230.00 30.00 340436 CPT 2012 07 17 10 47 00 3310-99 G ch4 CCGG 1781.290 0.910 ... H11 2012 09 06 16 12 00 -34.3523 18.4891 260.00 230.00 30.00 340437 CPT 2012 07 26 09 03 00 4707-99 G ch4 CCGG 1779.990 0.910 ... H11 2012 09 06 13 09 00 -34.3523 18.4891 260.00 230.00 30.00 340427 CPT 2012 07 26 09 03 00 70-99 G ch4 CCGG 1778.520 0.910 ... H11 2012 09 06 12 54 00 -34.3523 18.4891 260.00 230.00 30.00 340426 CPT 2012 07 31 08 00 00 4661-99 G ch4 CCGG 1774.300 0.910 ... H11 2012 09 05 16 47 00 -34.3523 18.4891 260.00 230.00 30.00 340418 CPT 2012 07 31 08 00 00 576-99 G ch4 CCGG 1773.860 0.910 ... H11 2012 09 05 17 03 00 -34.3523 18.4891 260.00 230.00 30.00 340419 CPT 2012 08 06 08 48 00 3448-99 G ch4 CCGG 1775.130 0.910 ... H11 2012 09 06 13 25 00 -34.3523 18.4891 260.00 230.00 30.00 340424 CPT 2012 08 06 08 48 00 6510-66 G ch4 CCGG 1775.110 0.910 ... H11 2012 09 06 13 40 00 -34.3523 18.4891 260.00 230.00 30.00 340425 CPT 2012 08 16 09 55 00 1935-99 G ch4 CCGG 1776.180 0.910 ... H11 2012 09 05 16 17 00 -34.3523 18.4891 260.00 230.00 30.00 340420 CPT 2012 08 16 09 55 00 6422-66 G ch4 CCGG 1776.680 0.910 ... H11 2012 09 05 16 32 00 -34.3523 18.4891 260.00 230.00 30.00 340421 CPT 2012 08 27 09 55 00 2951-99 G ch4 CCGG 1793.540 0.910 .X. H11 2012 10 02 16 55 00 -34.3523 18.4891 260.00 230.00 30.00 341686 CPT 2012 08 27 09 55 00 2981-99 G ch4 CCGG 1800.350 0.910 .X. H11 2012 10 02 17 11 00 -34.3523 18.4891 260.00 230.00 30.00 341687 CPT 2012 09 13 09 50 00 1008-99 G ch4 CCGG 1793.780 0.910 .X. H11 2012 10 03 08 39 00 -34.3523 18.4891 260.00 230.00 30.00 341684 CPT 2012 09 13 09 50 00 3162-99 G ch4 CCGG 1794.120 0.910 .X. H11 2012 10 03 08 54 00 -34.3523 18.4891 260.00 230.00 30.00 341685 CPT 2012 09 20 11 15 00 2798-99 G ch4 CCGG 1777.700 0.910 ... H11 2012 10 29 12 23 00 -34.3523 18.4891 260.00 230.00 30.00 342761 CPT 2012 09 20 11 15 00 99-99 G ch4 CCGG 1778.520 0.910 ... H11 2012 10 29 12 08 00 -34.3523 18.4891 260.00 230.00 30.00 342760 CPT 2012 09 29 09 30 00 2773-99 G ch4 CCGG 1777.930 0.910 ... H11 2012 10 29 13 24 00 -34.3523 18.4891 260.00 230.00 30.00 342763 CPT 2012 09 29 09 30 00 523-99 G ch4 CCGG 1778.310 0.910 ... H11 2012 10 29 13 09 00 -34.3523 18.4891 260.00 230.00 30.00 342762 CPT 2012 10 01 09 29 00 1438-99 G ch4 CCGG 1775.500 0.910 ... H11 2012 11 20 11 04 00 -34.3523 18.4891 260.00 230.00 30.00 343964 CPT 2012 10 01 09 29 00 6470-66 G ch4 CCGG 1775.380 0.910 ... H11 2012 11 20 11 19 00 -34.3523 18.4891 260.00 230.00 30.00 343965 CPT 2012 10 08 09 28 00 3614-99 G ch4 CCGG 1775.810 0.910 ... H11 2012 11 20 10 34 00 -34.3523 18.4891 260.00 230.00 30.00 343962 CPT 2012 10 08 09 28 00 5309-99 G ch4 CCGG 1776.670 0.910 ... H11 2012 11 20 10 49 00 -34.3523 18.4891 260.00 230.00 30.00 343963 CPT 2012 10 15 09 15 00 1763-99 G ch4 CCGG 1775.230 0.910 ... H11 2012 11 20 16 39 00 -34.3523 18.4891 260.00 230.00 30.00 343972 CPT 2012 10 15 09 15 00 4157-99 G ch4 CCGG 1775.890 0.910 ... H11 2012 11 20 16 54 00 -34.3523 18.4891 260.00 230.00 30.00 343973 CPT 2012 11 01 10 35 00 3599-99 G ch4 CCGG 1776.510 0.910 ... H11 2012 11 21 10 59 00 -34.3523 18.4891 260.00 230.00 30.00 343970 CPT 2012 11 01 10 35 00 5053-99 G ch4 CCGG 1775.950 0.910 ... H11 2012 11 21 11 15 00 -34.3523 18.4891 260.00 230.00 30.00 343971 CPT 2012 11 05 09 15 00 484-99 G ch4 CCGG 1769.910 0.910 ... H11 2012 12 20 15 07 00 -34.3523 18.4891 260.00 230.00 30.00 345040 CPT 2012 11 05 09 15 00 5168-99 G ch4 CCGG 1769.770 0.910 ... H11 2012 12 20 15 22 00 -34.3523 18.4891 260.00 230.00 30.00 345041 CPT 2012 11 19 09 45 00 1073-99 G ch4 CCGG 1765.050 0.910 ... H11 2012 12 20 15 53 00 -34.3523 18.4891 260.00 230.00 30.00 345038 CPT 2012 11 19 09 45 00 542-99 G ch4 CCGG 1764.400 0.910 ... H11 2012 12 20 15 37 00 -34.3523 18.4891 260.00 230.00 30.00 345039 CPT 2012 11 29 09 15 00 1607-99 G ch4 CCGG 1766.970 1.310 ... H6 2013 01 09 10 22 00 -34.3523 18.4891 260.00 230.00 30.00 345550 CPT 2012 11 29 09 15 00 4957-99 G ch4 CCGG 1765.130 1.310 ... H6 2013 01 09 10 38 00 -34.3523 18.4891 260.00 230.00 30.00 345551 CPT 2012 12 10 09 23 00 2260-99 G ch4 CCGG 1764.090 1.310 ... H6 2013 01 09 10 54 00 -34.3523 18.4891 260.00 230.00 30.00 345552 CPT 2012 12 10 09 23 00 2275-99 G ch4 CCGG 1762.140 1.310 ... H6 2013 01 09 11 10 00 -34.3523 18.4891 260.00 230.00 30.00 345553 CPT 2012 12 20 06 40 00 2939-99 G ch4 CCGG 1758.540 1.310 ... H6 2013 02 11 13 51 00 -34.3523 18.4891 260.00 230.00 30.00 347485 CPT 2012 12 20 06 40 00 3132-99 G ch4 CCGG 1757.140 1.310 ... H6 2013 02 11 14 07 00 -34.3523 18.4891 260.00 230.00 30.00 347486 CPT 2013 01 10 09 40 00 2124-99 G ch4 CCGG 1758.990 1.310 ... H6 2013 02 12 11 52 00 -34.3523 18.4891 260.00 230.00 30.00 347479 CPT 2013 01 10 09 40 00 3519-99 G ch4 CCGG 1757.410 1.310 ... H6 2013 02 12 12 09 00 -34.3523 18.4891 260.00 230.00 30.00 347480 CPT 2013 01 24 09 20 00 3792-99 G ch4 CCGG 1754.300 1.310 ... H6 2013 02 12 12 59 00 -34.3523 18.4891 260.00 230.00 30.00 347477 CPT 2013 01 24 09 20 00 4106-99 G ch4 CCGG 1751.770 1.310 ... H6 2013 02 12 13 16 00 -34.3523 18.4891 260.00 230.00 30.00 347478 CPT 2013 01 31 10 02 00 191-99 G ch4 CCGG 1750.770 1.310 ... H6 2013 02 12 12 25 00 -34.3523 18.4891 260.00 230.00 30.00 347475 CPT 2013 01 31 10 02 00 2825-99 G ch4 CCGG 1748.660 1.310 ... H6 2013 02 12 12 41 00 -34.3523 18.4891 260.00 230.00 30.00 347476 CPT 2013 02 11 09 30 00 3400-99 G ch4 CCGG 1748.860 1.310 ... H6 2013 03 21 12 58 00 -34.3523 18.4891 260.00 230.00 30.00 348846 CPT 2013 02 11 09 30 00 4050-99 G ch4 CCGG 1748.070 1.310 ... H6 2013 03 21 13 14 00 -34.3523 18.4891 260.00 230.00 30.00 348847 CPT 2013 02 14 09 00 00 198-99 G ch4 CCGG 1748.220 1.310 ... H6 2013 03 21 12 26 00 -34.3523 18.4891 260.00 230.00 30.00 348848 CPT 2013 02 14 09 00 00 486-99 G ch4 CCGG 1746.890 1.310 ... H6 2013 03 21 12 42 00 -34.3523 18.4891 260.00 230.00 30.00 348849 CPT 2013 02 28 08 40 00 1548-99 G ch4 CCGG 1745.740 1.310 ... H6 2013 03 21 13 31 00 -34.3523 18.4891 260.00 230.00 30.00 348838 CPT 2013 02 28 08 40 00 2174-99 G ch4 CCGG 1747.390 1.310 ... H6 2013 03 21 13 47 00 -34.3523 18.4891 260.00 230.00 30.00 348839 CPT 2013 03 07 08 50 00 2685-99 G ch4 CCGG 1746.480 1.310 ... H6 2013 03 21 14 19 00 -34.3523 18.4891 260.00 230.00 30.00 348841 CPT 2013 03 07 08 50 00 911-99 G ch4 CCGG 1746.970 1.310 ... H6 2013 03 21 14 03 00 -34.3523 18.4891 260.00 230.00 30.00 348840 CPT 2013 03 13 09 40 00 162-99 G ch4 CCGG 1750.010 0.910 ... H11 2013 04 22 13 11 00 -34.3523 18.4891 260.00 230.00 30.00 350367 CPT 2013 03 13 09 40 00 2103-99 G ch4 CCGG 1748.850 0.910 ... H11 2013 04 22 13 27 00 -34.3523 18.4891 260.00 230.00 30.00 350368 CPT 2013 03 18 10 48 00 3086-99 G ch4 CCGG 1753.900 0.910 ... H11 2013 04 22 12 39 00 -34.3523 18.4891 260.00 230.00 30.00 350365 CPT 2013 03 18 10 48 00 4407-99 G ch4 CCGG 1753.850 0.910 ... H11 2013 04 22 12 55 00 -34.3523 18.4891 260.00 230.00 30.00 350366 CPT 2013 03 22 09 11 00 1739-99 G ch4 CCGG 1751.790 0.910 ... H11 2013 04 22 13 43 00 -34.3523 18.4891 260.00 230.00 30.00 350363 CPT 2013 03 22 09 11 00 5267-99 G ch4 CCGG 1753.160 0.910 ... H11 2013 04 22 13 59 00 -34.3523 18.4891 260.00 230.00 30.00 350364 CPT 2013 04 03 08 15 00 2325-99 G ch4 CCGG 1756.040 0.910 ... H11 2013 04 22 14 15 00 -34.3523 18.4891 260.00 230.00 30.00 350369 CPT 2013 04 03 08 15 00 5149-99 G ch4 CCGG 1754.140 0.910 ... H11 2013 04 22 14 31 00 -34.3523 18.4891 260.00 230.00 30.00 350370 CPT 2013 04 08 08 40 00 3197-99 G ch4 CCGG 1753.840 0.910 ... H11 2013 06 18 14 07 00 -34.3523 18.4891 260.00 230.00 30.00 353608 CPT 2013 04 08 08 40 00 337-99 G ch4 CCGG 1754.900 0.910 ... H11 2013 06 18 13 51 00 -34.3523 18.4891 260.00 230.00 30.00 353607 CPT 2013 04 29 08 03 00 1414-99 G ch4 CCGG 1761.760 0.910 ... H11 2013 06 18 13 19 00 -34.3523 18.4891 260.00 230.00 30.00 353605 CPT 2013 04 29 08 03 00 1538-99 G ch4 CCGG 1762.300 0.910 ... H11 2013 06 18 13 35 00 -34.3523 18.4891 260.00 230.00 30.00 353606 CPT 2013 05 09 09 05 00 2338-99 G ch4 CCGG 1759.400 0.910 ... H11 2013 06 20 09 32 00 -34.3523 18.4891 260.00 230.00 30.00 353580 CPT 2013 05 09 09 05 00 3882-99 G ch4 CCGG 1760.720 0.910 ... H11 2013 06 20 09 48 00 -34.3523 18.4891 260.00 230.00 30.00 353581 CPT 2013 05 27 08 40 00 1002-99 G ch4 CCGG 1763.360 0.910 ... H11 2013 06 20 09 00 00 -34.3523 18.4891 260.00 230.00 30.00 353578 CPT 2013 05 27 08 40 00 5100-99 G ch4 CCGG 1763.230 0.910 ... H11 2013 06 20 09 16 00 -34.3523 18.4891 260.00 230.00 30.00 353579 CPT 2013 06 03 08 54 00 1957-99 G ch4 CCGG 1764.630 0.910 ... H11 2013 06 18 14 39 00 -34.3523 18.4891 260.00 230.00 30.00 353611 CPT 2013 06 03 08 54 00 243-99 G ch4 CCGG 1765.210 0.910 ... H11 2013 06 18 14 23 00 -34.3523 18.4891 260.00 230.00 30.00 353612 CPT 2013 06 07 08 23 00 1866-99 G ch4 CCGG 1772.020 0.910 ... H11 2013 06 18 14 55 00 -34.3523 18.4891 260.00 230.00 30.00 353609 CPT 2013 06 07 08 23 00 4738-99 G ch4 CCGG 1771.100 0.910 ... H11 2013 06 18 15 11 00 -34.3523 18.4891 260.00 230.00 30.00 353610 CPT 2013 06 13 08 50 00 2816-99 G ch4 CCGG 1770.410 0.910 ... H11 2013 08 12 12 38 00 -34.3523 18.4891 260.00 230.00 30.00 355615 CPT 2013 06 13 08 50 00 5147-99 G ch4 CCGG 1770.770 0.910 ... H11 2013 08 12 12 54 00 -34.3523 18.4891 260.00 230.00 30.00 355616 CPT 2013 06 26 09 08 00 1024-99 G ch4 CCGG 1769.760 0.910 ... H11 2013 09 06 09 31 00 -34.3523 18.4891 260.00 230.00 30.00 356914 CPT 2013 06 26 09 08 00 1671-99 G ch4 CCGG 1769.420 0.910 ... H11 2013 09 06 09 47 00 -34.3523 18.4891 260.00 230.00 30.00 356915 CPT 2013 07 09 10 16 00 3171-99 G ch4 CCGG 1850.400 0.910 A.. H11 2013 09 06 08 59 00 -34.3523 18.4891 260.00 230.00 30.00 356916 CPT 2013 07 09 10 16 00 3171-99 G ch4 CCGG 1778.020 0.910 ... H11 2013 09 06 12 11 00 -34.3523 18.4891 260.00 230.00 30.00 356916 CPT 2013 07 09 10 16 00 5136-99 G ch4 CCGG 3539.140 0.910 A.. H11 2013 09 06 09 15 00 -34.3523 18.4891 260.00 230.00 30.00 356917 CPT 2013 07 09 10 16 00 5136-99 G ch4 CCGG 1777.610 0.910 ... H11 2013 09 06 12 27 00 -34.3523 18.4891 260.00 230.00 30.00 356917 CPT 2013 07 22 09 26 00 1038-99 G ch4 CCGG 1777.520 0.910 ... H11 2013 08 12 12 06 00 -34.3523 18.4891 260.00 230.00 30.00 355613 CPT 2013 07 22 09 26 00 5193-99 G ch4 CCGG 1777.850 0.910 ... H11 2013 08 12 12 22 00 -34.3523 18.4891 260.00 230.00 30.00 355614 CPT 2013 07 29 09 46 00 1427-99 G ch4 CCGG 1781.060 1.310 ... H6 2013 09 24 14 14 00 -34.3523 18.4891 260.00 230.00 30.00 356983 CPT 2013 07 29 09 46 00 4762-99 G ch4 CCGG 1776.880 1.310 ... H6 2013 09 24 14 30 00 -34.3523 18.4891 260.00 230.00 30.00 356984 CPT 2013 08 06 09 20 00 1674-99 G ch4 CCGG 1777.670 1.310 ... H6 2013 09 24 15 19 00 -34.3523 18.4891 260.00 230.00 30.00 356985 CPT 2013 08 06 09 20 00 6217-66 G ch4 CCGG 1780.020 1.310 ... H6 2013 09 24 15 36 00 -34.3523 18.4891 260.00 230.00 30.00 356986 CPT 2013 08 12 09 20 00 2063-99 G ch4 CCGG 1781.510 0.910 ... H11 2013 10 23 14 27 00 -34.3523 18.4891 260.00 230.00 30.00 357840 CPT 2013 08 12 09 20 00 2768-99 G ch4 CCGG 1781.540 0.910 ... H11 2013 10 23 14 43 00 -34.3523 18.4891 260.00 230.00 30.00 357841 CPT 2013 08 29 09 18 00 3030-99 G ch4 CCGG 1781.600 0.910 ... H11 2013 10 23 14 59 00 -34.3523 18.4891 260.00 230.00 30.00 357838 CPT 2013 08 29 09 18 00 4596-99 G ch4 CCGG 1781.550 0.910 ... H11 2013 10 23 15 15 00 -34.3523 18.4891 260.00 230.00 30.00 357839 CPT 2013 09 09 09 23 00 2937-99 G ch4 CCGG 1779.950 1.310 ... H6 2013 10 23 14 20 00 -34.3523 18.4891 260.00 230.00 30.00 357844 CPT 2013 09 09 09 23 00 5329-99 G ch4 CCGG 1782.170 1.310 ... H6 2013 10 23 14 36 00 -34.3523 18.4891 260.00 230.00 30.00 357845 CPT 2013 09 12 08 40 00 2440-99 G ch4 CCGG 1784.680 1.310 ... H6 2013 10 23 14 52 00 -34.3523 18.4891 260.00 230.00 30.00 357842 CPT 2013 09 12 08 40 00 2625-99 G ch4 CCGG 1782.890 1.310 ... H6 2013 10 23 15 08 00 -34.3523 18.4891 260.00 230.00 30.00 357843 CPT 2013 09 19 09 11 00 249-99 G ch4 CCGG 1782.590 0.910 ... H11 2013 10 28 13 00 00 -34.3523 18.4891 260.00 230.00 30.00 358663 CPT 2013 09 19 09 11 00 796-99 G ch4 CCGG 1782.800 0.910 ... H11 2013 10 28 13 16 00 -34.3523 18.4891 260.00 230.00 30.00 358664 CPT 2013 09 23 09 06 00 4270-99 G ch4 CCGG 1782.810 0.910 ... H11 2013 10 28 13 32 00 -34.3523 18.4891 260.00 230.00 30.00 358661 CPT 2013 09 23 09 06 00 4711-99 G ch4 CCGG 1783.290 0.910 ... H11 2013 10 28 13 48 00 -34.3523 18.4891 260.00 230.00 30.00 358662 CPT 2013 10 04 09 45 00 1090-99 G ch4 CCGG 1779.790 1.310 ... H6 2013 10 31 16 53 00 -34.3523 18.4891 260.00 230.00 30.00 358731 CPT 2013 10 04 09 45 00 290-99 G ch4 CCGG 1781.570 1.310 ... H6 2013 10 31 16 36 00 -34.3523 18.4891 260.00 230.00 30.00 358730 CPT 2013 10 07 09 15 00 1592-99 G ch4 CCGG 1783.100 1.310 ... H6 2013 10 31 17 09 00 -34.3523 18.4891 260.00 230.00 30.00 358732 CPT 2013 10 07 09 15 00 4905-99 G ch4 CCGG 1781.890 1.310 ... H6 2013 10 31 17 25 00 -34.3523 18.4891 260.00 230.00 30.00 358733 CPT 2013 10 14 09 57 00 347-99 G ch4 CCGG 1781.240 0.910 ... H11 2013 11 19 10 36 00 -34.3523 18.4891 260.00 230.00 30.00 359845 CPT 2013 10 14 09 57 00 6383-66 G ch4 CCGG 1782.270 0.910 ... H11 2013 11 19 10 52 00 -34.3523 18.4891 260.00 230.00 30.00 359846 CPT 2013 10 21 09 45 00 3107-99 G ch4 CCGG 1780.070 1.310 ... H6 2013 11 19 11 20 00 -34.3523 18.4891 260.00 230.00 30.00 359843 CPT 2013 10 21 09 45 00 327-99 G ch4 CCGG 1778.510 1.310 ... H6 2013 11 19 11 04 00 -34.3523 18.4891 260.00 230.00 30.00 359844 CPT 2013 10 31 08 15 00 2585-99 G ch4 CCGG 1775.610 1.310 ... H6 2013 12 02 15 45 00 -34.3523 18.4891 260.00 230.00 30.00 360782 CPT 2013 10 31 08 15 00 3341-99 G ch4 CCGG 1775.170 1.310 ... H6 2013 12 02 16 02 00 -34.3523 18.4891 260.00 230.00 30.00 360783 CPT 2013 11 08 09 50 00 1645-99 G ch4 CCGG 1776.520 0.910 ... H11 2013 12 03 10 12 00 -34.3523 18.4891 260.00 230.00 30.00 360780 CPT 2013 11 08 09 50 00 934-99 G ch4 CCGG 1776.010 0.910 ... H11 2013 12 03 09 56 00 -34.3523 18.4891 260.00 230.00 30.00 360781 CPT 2013 11 14 10 10 00 1048-99 G ch4 CCGG 1770.950 1.310 ... H6 2013 12 09 13 50 00 -34.3523 18.4891 260.00 230.00 30.00 361154 CPT 2013 11 14 10 10 00 3491-99 G ch4 CCGG 1770.020 1.310 ... H6 2013 12 09 14 06 00 -34.3523 18.4891 260.00 230.00 30.00 361195 CPT 2013 11 21 08 30 00 2314-99 G ch4 CCGG 1775.280 1.310 ... H6 2013 12 11 13 21 00 -34.3523 18.4891 260.00 230.00 30.00 361152 CPT 2013 11 21 09 48 00 151-99 G ch4 CCGG 1774.380 1.310 ... H6 2013 12 06 13 33 00 -34.3523 18.4891 260.00 230.00 30.00 361163 CPT 2013 11 21 09 48 00 4490-99 G ch4 CCGG 1774.160 1.310 ... H6 2013 12 06 13 49 00 -34.3523 18.4891 260.00 230.00 30.00 361164 CPT 2013 11 28 09 10 00 4789-99 G ch4 CCGG 1772.300 0.910 ... H11 2013 12 16 12 31 00 -34.3523 18.4891 260.00 230.00 30.00 361194 CPT 2013 11 28 09 10 00 787-99 G ch4 CCGG 1771.750 0.910 ... H11 2013 12 16 12 15 00 -34.3523 18.4891 260.00 230.00 30.00 361193 CPT 2013 12 05 09 35 00 3482-99 G ch4 CCGG 1770.240 0.910 ... H11 2013 12 30 13 26 00 -34.3523 18.4891 260.00 230.00 30.00 362048 CPT 2013 12 05 09 35 00 930-99 G ch4 CCGG 1769.880 0.910 ... H11 2013 12 30 13 10 00 -34.3523 18.4891 260.00 230.00 30.00 362047 CPT 2013 12 17 08 50 00 4120-99 G ch4 CCGG 1764.970 0.910 ... H11 2013 12 30 13 58 00 -34.3523 18.4891 260.00 230.00 30.00 362046 CPT 2013 12 17 08 50 00 955-99 G ch4 CCGG 1764.560 0.910 ... H11 2013 12 30 13 42 00 -34.3523 18.4891 260.00 230.00 30.00 362045 CPT 2013 12 19 09 40 00 4370-99 G ch4 CCGG 1761.540 0.910 ... H11 2014 02 03 14 02 00 -34.3523 18.4891 260.00 230.00 30.00 363168 CPT 2013 12 19 09 40 00 4472-99 G ch4 CCGG 1762.590 0.910 ... H11 2014 02 03 14 18 00 -34.3523 18.4891 260.00 230.00 30.00 363169 CPT 2013 12 24 08 35 00 4101-99 G ch4 CCGG 1763.430 0.910 ... H11 2014 02 03 13 30 00 -34.3523 18.4891 260.00 230.00 30.00 363166 CPT 2013 12 24 08 35 00 6292-66 G ch4 CCGG 1763.340 0.910 ... H11 2014 02 03 13 46 00 -34.3523 18.4891 260.00 230.00 30.00 363167 CPT 2014 01 07 09 30 00 253-99 G ch4 CCGG 1760.010 1.310 ... H6 2014 02 06 09 57 00 -34.3523 18.4891 260.00 230.00 30.00 363137 CPT 2014 01 07 09 30 00 3388-99 G ch4 CCGG 1761.070 1.310 ... H6 2014 02 06 10 13 00 -34.3523 18.4891 260.00 230.00 30.00 363138 CPT 2014 01 09 08 45 00 2123-99 G ch4 CCGG 1760.090 1.310 ... H6 2014 02 06 09 25 00 -34.3523 18.4891 260.00 230.00 30.00 363139 CPT 2014 01 09 08 45 00 6397-66 G ch4 CCGG 1757.670 1.310 ... H6 2014 02 06 09 41 00 -34.3523 18.4891 260.00 230.00 30.00 363140 CPT 2014 01 13 10 00 00 2901-99 G ch4 CCGG 1756.220 1.310 ... H6 2014 02 19 13 08 00 -34.3523 18.4891 260.00 230.00 30.00 363966 CPT 2014 01 13 10 00 00 4000-99 G ch4 CCGG 1757.610 1.310 ... H6 2014 02 19 13 24 00 -34.3523 18.4891 260.00 230.00 30.00 363967 CPT 2014 01 16 09 25 00 1562-99 G ch4 CCGG 1755.390 1.310 ... H6 2014 02 19 13 40 00 -34.3523 18.4891 260.00 230.00 30.00 363968 CPT 2014 01 16 09 25 00 5119-99 G ch4 CCGG 1754.130 1.310 ... H6 2014 02 19 13 57 00 -34.3523 18.4891 260.00 230.00 30.00 363969 CPT 2014 01 20 08 40 00 411-99 G ch4 CCGG 1753.260 1.310 ... H6 2014 02 19 14 45 00 -34.3523 18.4891 260.00 230.00 30.00 363970 CPT 2014 01 20 08 40 00 4124-99 G ch4 CCGG 1751.180 1.310 ... H6 2014 02 19 15 01 00 -34.3523 18.4891 260.00 230.00 30.00 363971 CPT 2014 01 30 10 15 00 4325-99 G ch4 CCGG 1756.650 1.310 ... H6 2014 02 19 14 13 00 -34.3523 18.4891 260.00 230.00 30.00 363972 CPT 2014 01 30 10 15 00 4577-99 G ch4 CCGG 1754.010 1.310 ... H6 2014 02 19 14 29 00 -34.3523 18.4891 260.00 230.00 30.00 363973 CPT 2014 02 10 08 36 00 4721-99 G ch4 CCGG 1752.890 0.910 ... H11 2014 03 27 15 35 00 -34.3523 18.4891 260.00 230.00 30.00 365814 CPT 2014 02 10 08 36 00 733-99 G ch4 CCGG 1753.610 0.910 ... H11 2014 03 27 15 19 00 -34.3523 18.4891 260.00 230.00 30.00 365813 CPT 2014 02 20 09 12 00 2985-99 G ch4 CCGG 1752.490 0.910 ... H11 2014 03 27 16 07 00 -34.3523 18.4891 260.00 230.00 30.00 365812 CPT 2014 02 20 09 12 00 74-99 G ch4 CCGG 1752.520 0.910 ... H11 2014 03 27 15 51 00 -34.3523 18.4891 260.00 230.00 30.00 365811 CPT 2014 02 24 09 45 00 3209-99 G ch4 CCGG 1755.570 0.910 ... H11 2014 03 27 14 15 00 -34.3523 18.4891 260.00 230.00 30.00 365809 CPT 2014 02 24 09 45 00 6037-66 G ch4 CCGG 1755.240 0.910 ... H11 2014 03 27 14 31 00 -34.3523 18.4891 260.00 230.00 30.00 365810 CPT 2014 03 03 08 50 00 1525-99 G ch4 CCGG 1755.300 0.910 ... H11 2014 03 27 14 47 00 -34.3523 18.4891 260.00 230.00 30.00 365807 CPT 2014 03 03 08 50 00 4050-99 G ch4 CCGG 1754.410 0.910 ... H11 2014 03 27 15 03 00 -34.3523 18.4891 260.00 230.00 30.00 365808 CPT 2014 03 07 08 35 00 1068-99 G ch4 CCGG 1757.480 0.910 ... H11 2014 04 16 14 43 00 -34.3523 18.4891 260.00 230.00 30.00 366600 CPT 2014 03 07 08 35 00 4430-99 G ch4 CCGG 1757.310 0.910 ... H11 2014 04 16 14 59 00 -34.3523 18.4891 260.00 230.00 30.00 366601 CPT 2014 03 11 09 35 00 2692-99 G ch4 CCGG 1752.780 0.910 ... H11 2014 04 16 14 11 00 -34.3523 18.4891 260.00 230.00 30.00 366602 CPT 2014 03 11 09 35 00 4948-99 G ch4 CCGG 1751.970 0.910 ... H11 2014 04 16 14 27 00 -34.3523 18.4891 260.00 230.00 30.00 366603 CPT 2014 03 17 08 53 00 1615-99 G ch4 CCGG 1760.590 0.910 ... H11 2014 04 16 11 14 00 -34.3523 18.4891 260.00 230.00 30.00 366589 CPT 2014 03 17 08 53 00 282-99 G ch4 CCGG 1760.200 0.910 ... H11 2014 04 16 10 58 00 -34.3523 18.4891 260.00 230.00 30.00 366588 CPT 2014 03 24 09 40 00 2353-99 G ch4 CCGG 1762.890 0.910 ... H11 2014 04 16 11 30 00 -34.3523 18.4891 260.00 230.00 30.00 366590 CPT 2014 03 24 09 40 00 6596-66 G ch4 CCGG 1774.640 0.910 N.. H11 2014 04 16 11 46 00 -34.3523 18.4891 260.00 230.00 30.00 366591 CPT 2014 04 01 09 17 00 3989-99 G ch4 CCGG 1763.460 0.910 ... H11 2014 05 07 12 17 00 -34.3523 18.4891 260.00 230.00 30.00 367385 CPT 2014 04 01 09 17 00 4354-99 G ch4 CCGG 1763.530 0.910 ... H11 2014 05 07 12 33 00 -34.3523 18.4891 260.00 230.00 30.00 367386 CPT 2014 04 03 08 40 00 1445-99 G ch4 CCGG 1758.990 0.910 ... H11 2014 05 07 12 50 00 -34.3523 18.4891 260.00 230.00 30.00 367383 CPT 2014 04 03 08 40 00 1604-99 G ch4 CCGG 1758.960 0.910 ... H11 2014 05 07 13 06 00 -34.3523 18.4891 260.00 230.00 30.00 367384 CPT 2014 04 17 09 05 00 2560-99 G ch4 CCGG 1771.470 0.910 ... H11 2015 03 17 11 47 00 -34.3523 18.4891 260.00 230.00 30.00 382480 CPT 2014 04 17 09 05 00 4688-99 G ch4 CCGG 1770.710 0.910 ... H11 2015 03 17 12 03 00 -34.3523 18.4891 260.00 230.00 30.00 382481 CPT 2014 05 05 09 35 00 2856-99 G ch4 CCGG 1766.280 0.910 ... H11 2015 03 16 13 21 00 -34.3523 18.4891 260.00 230.00 30.00 382488 CPT 2014 05 05 09 35 00 6493-66 G ch4 CCGG 1766.210 0.910 ... H11 2015 03 16 13 37 00 -34.3523 18.4891 260.00 230.00 30.00 382489 CPT 2014 05 22 09 20 00 2474-99 G ch4 CCGG 1779.810 0.910 ... H11 2014 08 07 13 20 00 -34.3523 18.4891 260.00 230.00 30.00 371527 CPT 2014 05 26 10 24 00 4300-99 G ch4 CCGG 1774.430 0.910 ... H11 2014 08 07 13 36 00 -34.3523 18.4891 260.00 230.00 30.00 371524 CPT 2014 06 02 10 05 00 4071-99 G ch4 CCGG 1774.530 0.910 ... H11 2014 07 02 18 17 00 -34.3523 18.4891 260.00 230.00 30.00 369792 CPT 2014 06 02 10 05 00 4658-99 G ch4 CCGG 1774.880 0.910 ... H11 2014 07 02 18 33 00 -34.3523 18.4891 260.00 230.00 30.00 369793 CPT 2014 06 05 08 35 00 5147-99 G ch4 CCGG 1775.120 0.910 ... H11 2014 07 03 13 12 00 -34.3523 18.4891 260.00 230.00 30.00 369794 CPT 2014 06 05 08 35 00 6255-66 G ch4 CCGG 1774.520 0.910 ... H11 2014 07 03 13 28 00 -34.3523 18.4891 260.00 230.00 30.00 369795 CPT 2014 06 09 09 15 00 3132-99 G ch4 CCGG 1774.920 0.910 ... H11 2014 08 07 12 16 00 -34.3523 18.4891 260.00 230.00 30.00 371522 CPT 2014 06 09 09 15 00 3400-99 G ch4 CCGG 1774.890 0.910 ... H11 2014 08 07 12 32 00 -34.3523 18.4891 260.00 230.00 30.00 371523 CPT 2014 06 19 09 18 00 3103-99 G ch4 CCGG 1778.500 0.910 ... H11 2014 08 07 13 04 00 -34.3523 18.4891 260.00 230.00 30.00 371526 CPT 2014 06 19 09 18 00 428-99 G ch4 CCGG 1777.120 0.910 ... H11 2014 08 07 12 48 00 -34.3523 18.4891 260.00 230.00 30.00 371525 CPT 2014 06 26 08 25 00 1537-99 G ch4 CCGG 1785.240 0.910 ... H11 2014 08 26 12 58 00 -34.3523 18.4891 260.00 230.00 30.00 372733 CPT 2014 06 26 08 25 00 945-99 G ch4 CCGG 1785.610 0.910 ... H11 2014 08 26 12 42 00 -34.3523 18.4891 260.00 230.00 30.00 372732 CPT 2014 08 05 08 53 00 1463-99 G ch4 CCGG 1790.950 0.910 ... H11 2014 08 26 13 14 00 -34.3523 18.4891 260.00 230.00 30.00 372730 CPT 2014 08 05 08 53 00 3891-99 G ch4 CCGG 1790.920 0.910 ... H11 2014 08 26 13 30 00 -34.3523 18.4891 260.00 230.00 30.00 372731 CPT 2014 08 20 09 55 00 5029-99 G ch4 CCGG 1793.510 0.910 ... H11 2014 09 04 12 14 00 -34.3523 18.4891 260.00 230.00 30.00 373384 CPT 2014 08 20 09 55 00 5406-99 G ch4 CCGG 1794.220 0.910 ... H11 2014 09 04 12 30 00 -34.3523 18.4891 260.00 230.00 30.00 373385 CPT 2014 08 21 09 05 00 3052-99 G ch4 CCGG 1790.630 0.910 ... H11 2014 09 04 11 42 00 -34.3523 18.4891 260.00 230.00 30.00 373382 CPT 2014 08 21 09 05 00 3316-99 G ch4 CCGG 1791.340 0.910 ... H11 2014 09 04 11 58 00 -34.3523 18.4891 260.00 230.00 30.00 373383 CPT 2014 08 26 08 50 00 1488-99 G ch4 CCGG 1868.530 0.910 .X. H11 2014 09 26 10 38 00 -34.3523 18.4891 260.00 230.00 30.00 374493 CPT 2014 08 26 08 50 00 6184-66 G ch4 CCGG 1867.530 0.910 .X. H11 2014 09 26 10 54 00 -34.3523 18.4891 260.00 230.00 30.00 374494 CPT 2014 08 28 09 00 00 4063-99 G ch4 CCGG 1791.140 0.910 ... H11 2014 09 26 10 22 00 -34.3523 18.4891 260.00 230.00 30.00 374492 CPT 2014 08 28 09 00 00 740-99 G ch4 CCGG 1790.880 0.910 ... H11 2014 09 26 10 06 00 -34.3523 18.4891 260.00 230.00 30.00 374491 CPT 2014 09 08 10 10 00 3360-99 G ch4 CCGG 1793.660 0.910 ... H11 2014 09 29 13 33 00 -34.3523 18.4891 260.00 230.00 30.00 374540 CPT 2014 09 08 10 10 00 500-99 G ch4 CCGG 1792.730 0.910 ... H11 2014 09 29 13 17 00 -34.3523 18.4891 260.00 230.00 30.00 374541 CPT 2014 09 11 09 42 00 5280-99 G ch4 CCGG 1793.740 0.910 ... H11 2014 09 29 11 57 00 -34.3523 18.4891 260.00 230.00 30.00 374539 CPT 2014 09 11 09 42 00 881-99 G ch4 CCGG 1792.220 0.910 ... H11 2014 09 29 11 41 00 -34.3523 18.4891 260.00 230.00 30.00 374538 CPT 2014 09 17 11 36 00 3012-99 G ch4 CCGG 1791.580 0.910 ... H11 2014 12 02 16 03 00 -34.3523 18.4891 260.00 230.00 30.00 377612 CPT 2014 09 17 11 36 00 3190-99 G ch4 CCGG 1792.050 0.910 ... H11 2014 12 02 16 19 00 -34.3523 18.4891 260.00 230.00 30.00 377613 CPT 2014 09 19 10 52 00 1547-99 G ch4 CCGG 1792.790 0.910 ... H11 2014 12 02 15 31 00 -34.3523 18.4891 260.00 230.00 30.00 377610 CPT 2014 09 19 10 52 00 4956-99 G ch4 CCGG 1791.680 0.910 ... H11 2014 12 02 15 47 00 -34.3523 18.4891 260.00 230.00 30.00 377611 CPT 2014 09 25 08 26 00 4064-99 G ch4 CCGG 1790.840 0.910 ... H11 2015 01 05 14 04 00 -34.3523 18.4891 260.00 230.00 30.00 379299 CPT 2014 09 25 08 26 00 407-99 G ch4 CCGG 1791.260 0.910 ... H11 2015 01 05 14 20 00 -34.3523 18.4891 260.00 230.00 30.00 379300 CPT 2014 10 09 09 38 00 1011-99 G ch4 CCGG 1791.290 0.910 ... H11 2015 01 05 15 56 00 -34.3523 18.4891 260.00 230.00 30.00 379297 CPT 2014 10 09 09 38 00 317-99 G ch4 CCGG 1792.200 0.910 ... H11 2015 01 05 15 40 00 -34.3523 18.4891 260.00 230.00 30.00 379298 CPT 2014 10 13 09 21 00 2852-99 G ch4 CCGG 1793.110 0.910 ... H11 2014 12 01 15 45 00 -34.3523 18.4891 260.00 230.00 30.00 377672 CPT 2014 10 13 09 21 00 6631-66 G ch4 CCGG 1792.390 0.910 ... H11 2014 12 01 15 29 00 -34.3523 18.4891 260.00 230.00 30.00 377673 CPT 2014 10 30 08 55 00 3543-99 G ch4 CCGG 1790.000 0.910 ... H11 2014 12 01 16 17 00 -34.3523 18.4891 260.00 230.00 30.00 377671 CPT 2014 10 30 08 55 00 947-99 G ch4 CCGG 1790.410 0.910 ... H11 2014 12 01 16 01 00 -34.3523 18.4891 260.00 230.00 30.00 377670 CPT 2014 11 10 09 15 00 3141-99 G ch4 CCGG 1790.380 0.910 ... H11 2015 01 06 13 17 00 -34.3523 18.4891 260.00 230.00 30.00 379361 CPT 2014 11 10 09 15 00 4951-99 G ch4 CCGG 1788.940 0.910 ... H11 2015 01 06 13 33 00 -34.3523 18.4891 260.00 230.00 30.00 379362 CPT 2014 11 13 08 45 00 3131-99 G ch4 CCGG 1785.420 0.910 ... H11 2015 01 05 10 01 00 -34.3523 18.4891 260.00 230.00 30.00 379316 CPT 2014 11 13 08 45 00 4928-99 G ch4 CCGG 1786.990 0.910 ... H11 2015 01 05 10 17 00 -34.3523 18.4891 260.00 230.00 30.00 379317 CPT 2014 11 27 09 10 00 1593-99 G ch4 CCGG 1780.510 0.910 ... H11 2015 01 05 10 33 00 -34.3523 18.4891 260.00 230.00 30.00 379314 CPT 2014 11 27 09 10 00 6114-66 G ch4 CCGG 1780.040 0.910 ... H11 2015 01 05 10 49 00 -34.3523 18.4891 260.00 230.00 30.00 379315 CPT 2014 12 01 09 48 00 3006-99 G ch4 CCGG 1779.540 0.910 ... H11 2015 03 16 14 24 00 -34.3523 18.4891 260.00 230.00 30.00 382484 CPT 2014 12 01 09 48 00 4992-99 G ch4 CCGG 1778.780 0.910 ... H11 2015 03 16 14 40 00 -34.3523 18.4891 260.00 230.00 30.00 382485 CPT 2014 12 10 09 00 00 257-99 G ch4 CCGG 1776.740 0.910 ... H11 2015 03 16 13 53 00 -34.3523 18.4891 260.00 230.00 30.00 382482 CPT 2014 12 10 09 00 00 4136-99 G ch4 CCGG 1776.980 0.910 ... H11 2015 03 16 14 08 00 -34.3523 18.4891 260.00 230.00 30.00 382483 CPT 2014 12 12 08 55 00 2182-99 G ch4 CCGG 1779.320 0.910 ... H11 2015 02 12 10 14 00 -34.3523 18.4891 260.00 230.00 30.00 380974 CPT 2014 12 12 08 55 00 3661-99 G ch4 CCGG 1779.840 0.910 ... H11 2015 02 12 10 30 00 -34.3523 18.4891 260.00 230.00 30.00 380975 CPT 2014 12 31 07 53 00 1428-99 G ch4 CCGG 1772.420 0.910 ... H11 2015 02 12 09 58 00 -34.3523 18.4891 260.00 230.00 30.00 380973 CPT 2014 12 31 07 53 00 2172-99 G ch4 CCGG 1773.380 0.910 ... H11 2015 02 12 09 42 00 -34.3523 18.4891 260.00 230.00 30.00 380972 CPT 2015 01 19 09 40 00 3042-99 G ch4 CCGG 1768.960 0.910 ... H11 2015 03 12 09 49 00 -34.3523 18.4891 260.00 230.00 30.00 382356 CPT 2015 01 19 09 40 00 352-99 G ch4 CCGG 1768.390 0.910 ... H11 2015 03 12 09 33 00 -34.3523 18.4891 260.00 230.00 30.00 382357 CPT 2015 01 26 09 20 00 426-99 G ch4 CCGG 1764.400 0.910 ... H11 2015 03 11 15 45 00 -34.3523 18.4891 260.00 230.00 30.00 382354 CPT 2015 01 26 09 20 00 4713-99 G ch4 CCGG 1763.230 0.910 ... H11 2015 03 11 16 00 00 -34.3523 18.4891 260.00 230.00 30.00 382355 CPT 2015 02 05 09 35 00 1751-99 G ch4 CCGG 1766.780 0.910 ... H11 2015 04 10 13 11 00 -34.3523 18.4891 260.00 230.00 30.00 384193 CPT 2015 02 05 09 35 00 1981-99 G ch4 CCGG 1766.110 0.910 ... H11 2015 04 10 13 26 00 -34.3523 18.4891 260.00 230.00 30.00 384194 CPT 2015 03 05 08 55 00 1356-99 G ch4 CCGG 1765.590 0.910 ... H11 2015 06 23 15 40 00 -34.3523 18.4891 260.00 230.00 30.00 387418 CPT 2015 03 05 08 55 00 1755-99 G ch4 CCGG 1766.070 0.910 ... H11 2015 06 23 15 56 00 -34.3523 18.4891 260.00 230.00 30.00 387419 CPT 2015 03 16 08 57 00 2657-99 G ch4 CCGG 1770.150 0.910 ... H11 2015 04 10 12 55 00 -34.3523 18.4891 260.00 230.00 30.00 384191 CPT 2015 03 16 08 57 00 3041-99 G ch4 CCGG 1770.150 0.910 ... H11 2015 04 10 12 39 00 -34.3523 18.4891 260.00 230.00 30.00 384192 CPT 2015 03 26 09 05 00 1647-99 G ch4 CCGG 1773.410 0.910 ... H11 2015 05 06 13 15 00 -34.3523 18.4891 260.00 230.00 30.00 385810 CPT 2015 03 26 09 05 00 2445-99 G ch4 CCGG 1773.020 0.910 ... H11 2015 05 06 13 31 00 -34.3523 18.4891 260.00 230.00 30.00 385811 CPT 2015 04 02 09 11 00 171-99 G ch4 CCGG 1771.510 0.910 ... H11 2015 05 06 12 43 00 -34.3523 18.4891 260.00 230.00 30.00 385808 CPT 2015 04 02 09 11 00 1794-99 G ch4 CCGG 1772.380 0.910 ... H11 2015 05 06 12 59 00 -34.3523 18.4891 260.00 230.00 30.00 385809 CPT 2015 04 16 08 40 00 2531-99 G ch4 CCGG 1774.330 0.910 ... H11 2015 06 23 16 27 00 -34.3523 18.4891 260.00 230.00 30.00 387417 CPT 2015 04 16 08 40 00 4127-99 G ch4 CCGG 1774.130 0.910 ... H11 2015 06 23 16 11 00 -34.3523 18.4891 260.00 230.00 30.00 387416 CPT 2015 04 23 10 55 00 1642-99 G ch4 CCGG 1777.680 0.910 ... H11 2015 06 11 14 34 00 -34.3523 18.4891 260.00 230.00 30.00 387427 CPT 2015 04 23 10 55 00 2804-99 G ch4 CCGG 1779.390 0.910 ... H11 2015 06 11 14 19 00 -34.3523 18.4891 260.00 230.00 30.00 387426 CPT 2015 04 29 10 08 00 289-99 G ch4 CCGG 1781.680 0.910 ... H11 2015 06 11 13 47 00 -34.3523 18.4891 260.00 230.00 30.00 387424 CPT 2015 04 29 10 08 00 5198-99 G ch4 CCGG 1781.240 0.910 ... H11 2015 06 11 14 03 00 -34.3523 18.4891 260.00 230.00 30.00 387425 CPT 2015 05 26 09 14 00 4579-99 G ch4 CCGG 1792.620 0.910 ... H11 2015 07 30 15 32 00 -34.3523 18.4891 260.00 230.00 30.00 390309 CPT 2015 05 26 09 14 00 4885-99 G ch4 CCGG 1791.530 0.910 ... H11 2015 07 30 15 17 00 -34.3523 18.4891 260.00 230.00 30.00 390310 CPT 2015 06 01 08 40 00 2859-99 G ch4 CCGG 1784.390 0.910 ... H11 2015 07 30 14 45 00 -34.3523 18.4891 260.00 230.00 30.00 390307 CPT 2015 06 01 08 40 00 3868-99 G ch4 CCGG 1785.080 0.910 ... H11 2015 07 30 15 01 00 -34.3523 18.4891 260.00 230.00 30.00 390308 CPT 2015 06 23 09 13 00 151-99 G ch4 CCGG 1789.700 0.910 ... H11 2015 08 11 14 07 00 -34.3523 18.4891 260.00 230.00 30.00 391101 CPT 2015 06 23 09 13 00 2553-99 G ch4 CCGG 1788.860 0.910 ... H11 2015 08 11 14 23 00 -34.3523 18.4891 260.00 230.00 30.00 391102 CPT 2015 07 09 11 27 00 2742-99 G ch4 CCGG 1796.690 0.910 ... H11 2015 08 11 14 39 00 -34.3523 18.4891 260.00 230.00 30.00 391103 CPT 2015 07 09 11 27 00 423-99 G ch4 CCGG 1796.630 0.910 ... H11 2015 08 11 14 54 00 -34.3523 18.4891 260.00 230.00 30.00 391104 CPT 2015 07 27 11 13 00 1698-99 G ch4 CCGG 1799.070 0.910 ... H11 2015 09 15 11 58 00 -34.3523 18.4891 260.00 230.00 30.00 393485 CPT 2015 07 27 11 13 00 4121-99 G ch4 CCGG 1799.090 0.910 ... H11 2015 09 15 11 42 00 -34.3523 18.4891 260.00 230.00 30.00 393484 CPT 2015 07 30 11 05 00 3434-99 G ch4 CCGG 1799.490 0.910 ... H11 2015 09 15 12 14 00 -34.3523 18.4891 260.00 230.00 30.00 393482 CPT 2015 07 30 11 05 00 4715-99 G ch4 CCGG 1798.690 0.910 ... H11 2015 09 15 12 29 00 -34.3523 18.4891 260.00 230.00 30.00 393483 CPT 2015 08 13 09 25 00 515-99 G ch4 CCGG 1803.060 0.910 ... H11 2015 10 01 12 18 00 -34.3523 18.4891 260.00 230.00 30.00 394690 CPT 2015 08 13 09 25 00 5317-99 G ch4 CCGG 1802.670 0.910 ... H11 2015 10 01 12 34 00 -34.3523 18.4891 260.00 230.00 30.00 394691 CPT 2015 08 31 10 54 00 2144-99 G ch4 CCGG 1801.710 0.910 ... H11 2015 10 01 14 09 00 -34.3523 18.4891 260.00 230.00 30.00 394692 CPT 2015 08 31 10 54 00 2967-99 G ch4 CCGG 1800.910 0.910 ... H11 2015 10 01 13 53 00 -34.3523 18.4891 260.00 230.00 30.00 394693 CPT 2015 09 30 09 36 00 3289-99 G ch4 CCGG 1802.670 0.910 ... H11 2015 10 30 10 01 00 -34.3523 18.4891 260.00 230.00 30.00 396412 CPT 2015 09 30 09 36 00 3557-99 G ch4 CCGG 1802.720 0.910 ... H11 2015 10 30 09 45 00 -34.3523 18.4891 260.00 230.00 30.00 396411 CPT 2015 10 02 10 35 00 2676-99 G ch4 CCGG 1801.860 0.910 ... H11 2015 10 30 10 48 00 -34.3523 18.4891 260.00 230.00 30.00 396410 CPT 2015 10 02 10 35 00 4693-99 G ch4 CCGG 1801.750 0.910 ... H11 2015 10 30 11 04 00 -34.3523 18.4891 260.00 230.00 30.00 396409 CPT 2015 10 06 11 30 00 302-99 G ch4 CCGG 1800.560 0.910 ... H11 2015 10 30 10 16 00 -34.3523 18.4891 260.00 230.00 30.00 396405 CPT 2015 10 06 13 30 00 1068-99 G ch4 CCGG 1801.620 0.910 ... H11 2015 10 30 10 32 00 -34.3523 18.4891 260.00 230.00 30.00 396406 CPT 2015 10 12 10 55 00 2174-99 G ch4 CCGG 1801.980 0.910 ... H11 2015 10 29 17 10 00 -34.3523 18.4891 260.00 230.00 30.00 396407 CPT 2015 10 12 10 55 00 4372-99 G ch4 CCGG 1802.510 0.910 ... H11 2015 10 29 17 26 00 -34.3523 18.4891 260.00 230.00 30.00 396408 CPT 2015 11 09 08 50 00 1435-99 G ch4 CCGG 1797.080 0.910 ... H11 2015 12 04 10 50 00 -34.3523 18.4891 260.00 230.00 30.00 398367 CPT 2015 11 09 08 50 00 2390-99 G ch4 CCGG 1797.070 0.910 ... H11 2015 12 04 11 06 00 -34.3523 18.4891 260.00 230.00 30.00 398327 CPT 2015 11 12 09 41 00 1318-99 G ch4 CCGG 1796.680 0.910 ... H11 2015 12 04 11 23 00 -34.3523 18.4891 260.00 230.00 30.00 398366 CPT 2015 11 12 09 41 00 2349-99 G ch4 CCGG 1797.010 0.910 ... H11 2015 12 04 11 39 00 -34.3523 18.4891 260.00 230.00 30.00 398326 CPT 2015 12 09 08 15 00 2388-99 G ch4 CCGG 1796.240 0.910 ... H11 2016 04 01 12 38 00 -34.3523 18.4891 260.00 230.00 30.00 404393 CPT 2015 12 09 08 15 00 4910-99 G ch4 CCGG 1796.080 0.910 ... H11 2016 04 01 12 54 00 -34.3523 18.4891 260.00 230.00 30.00 404394 CPT 2016 01 28 08 19 00 1681-99 G ch4 CCGG 1780.630 0.910 ... H11 2016 04 01 13 09 00 -34.3523 18.4891 260.00 230.00 30.00 404391 CPT 2016 01 28 08 19 00 3499-99 G ch4 CCGG 1780.990 0.910 ... H11 2016 04 01 13 25 00 -34.3523 18.4891 260.00 230.00 30.00 404392 CPT 2016 03 10 09 10 00 1478-99 G ch4 CCGG 1773.500 0.910 ... H11 2016 04 12 11 20 00 -34.3523 18.4891 260.00 230.00 30.00 405091 CPT 2016 03 10 09 10 00 4371-99 G ch4 CCGG 1773.590 0.910 ... H11 2016 04 12 11 04 00 -34.3523 18.4891 260.00 230.00 30.00 405092 CPT 2016 03 18 08 58 00 4034-99 G ch4 CCGG 1776.460 0.910 ... H11 2016 04 12 12 39 00 -34.3523 18.4891 260.00 230.00 30.00 405089 CPT 2016 03 18 08 58 00 5285-99 G ch4 CCGG 1775.890 0.910 ... H11 2016 04 12 12 55 00 -34.3523 18.4891 260.00 230.00 30.00 405090 CPT 2016 03 23 08 55 00 1487-99 G ch4 CCGG 1776.410 0.910 ... H11 2016 04 13 10 06 00 -34.3523 18.4891 260.00 230.00 30.00 405087 CPT 2016 03 23 08 55 00 1553-99 G ch4 CCGG 1776.510 0.910 ... H11 2016 04 13 10 22 00 -34.3523 18.4891 260.00 230.00 30.00 405088 CPT 2016 03 24 09 35 00 2871-99 G ch4 CCGG 1777.860 0.910 ... H11 2016 04 13 09 51 00 -34.3523 18.4891 260.00 230.00 30.00 405086 CPT 2016 03 24 09 35 00 977-99 G ch4 CCGG 1776.890 0.910 ... H11 2016 04 13 09 35 00 -34.3523 18.4891 260.00 230.00 30.00 405085 CPT 2016 04 11 11 30 00 1562-99 G ch4 CCGG 1788.380 0.910 ... H11 2016 07 05 16 16 00 -34.3523 18.4891 260.00 230.00 30.00 409372 CPT 2016 04 11 11 30 00 530-99 G ch4 CCGG 1789.330 0.910 ... H11 2016 07 05 16 00 00 -34.3523 18.4891 260.00 230.00 30.00 409371 CPT 2016 04 21 10 08 00 2414-99 G ch4 CCGG 1796.650 0.910 .X. H11 2016 07 05 15 28 00 -34.3523 18.4891 260.00 230.00 30.00 409369 CPT 2016 04 21 10 08 00 4123-99 G ch4 CCGG 1797.540 0.910 .X. H11 2016 07 05 15 44 00 -34.3523 18.4891 260.00 230.00 30.00 409370 CPT 2016 04 25 09 55 00 1307-99 G ch4 CCGG 1783.250 0.910 ... H11 2016 07 05 16 32 00 -34.3523 18.4891 260.00 230.00 30.00 409373 CPT 2016 04 25 09 55 00 1474-99 G ch4 CCGG 1784.040 0.910 ... H11 2016 07 05 16 47 00 -34.3523 18.4891 260.00 230.00 30.00 409374 CPT 2016 04 29 08 30 00 2884-99 G ch4 CCGG 1784.170 0.910 ... H11 2016 07 06 13 26 00 -34.3523 18.4891 260.00 230.00 30.00 409375 CPT 2016 05 19 08 20 00 1567-99 G ch4 CCGG 1790.680 0.910 ... H11 2016 07 19 15 57 00 -34.3523 18.4891 260.00 230.00 30.00 410638 CPT 2016 05 19 08 20 00 4508-99 G ch4 CCGG 1790.630 0.910 ... H11 2016 07 19 16 13 00 -34.3523 18.4891 260.00 230.00 30.00 410639 CPT 2016 06 27 08 55 00 1355-99 G ch4 CCGG 1797.810 0.910 ... H11 2016 07 19 16 28 00 -34.3523 18.4891 260.00 230.00 30.00 410642 CPT 2016 06 27 08 55 00 4921-99 G ch4 CCGG 1797.630 0.910 ... H11 2016 07 19 16 44 00 -34.3523 18.4891 260.00 230.00 30.00 410643 CPT 2016 07 18 08 50 00 5439-99 G ch4 CCGG 1801.150 0.910 ... H11 2016 08 23 14 13 00 -34.3523 18.4891 260.00 230.00 30.00 412702 CPT 2016 07 18 08 50 00 5616-99 G ch4 CCGG 1800.910 0.910 ... H11 2016 08 23 14 29 00 -34.3523 18.4891 260.00 230.00 30.00 412703 CPT 2016 07 20 10 15 00 5444-99 G ch4 CCGG 1809.240 0.910 ... H11 2016 08 24 09 50 00 -34.3523 18.4891 260.00 230.00 30.00 412698 CPT 2016 07 20 10 15 00 5457-99 G ch4 CCGG 1808.710 0.910 ... H11 2016 08 24 10 06 00 -34.3523 18.4891 260.00 230.00 30.00 412699 CPT 2016 07 21 08 55 00 3906-99 G ch4 CCGG 1811.470 0.910 .X. H11 2016 08 23 16 19 00 -34.3523 18.4891 260.00 230.00 30.00 412696 CPT 2016 07 21 08 55 00 4655-99 G ch4 CCGG 1814.890 0.910 .X. H11 2016 08 23 16 35 00 -34.3523 18.4891 260.00 230.00 30.00 412697 CPT 2016 08 15 09 30 00 1702-99 G ch4 CCGG 1810.280 0.910 ... H11 2016 08 23 16 51 00 -34.3523 18.4891 260.00 230.00 30.00 412694 CPT 2016 08 15 09 30 00 2464-99 G ch4 CCGG 1811.580 0.910 ... H11 2016 08 23 17 07 00 -34.3523 18.4891 260.00 230.00 30.00 412695 CPT 2016 08 25 09 30 00 5620-99 G ch4 CCGG 1805.780 0.910 ... H11 2016 11 10 11 39 00 -34.3523 18.4891 260.00 230.00 30.00 416369 CPT 2016 08 25 09 30 00 5637-99 G ch4 CCGG 1805.800 0.910 ... H11 2016 11 10 11 23 00 -34.3523 18.4891 260.00 230.00 30.00 416370 CPT 2016 09 02 09 40 00 5465-99 G ch4 CCGG 1806.860 0.910 ... H11 2016 11 14 14 07 00 -34.3523 18.4891 260.00 230.00 30.00 416383 CPT 2016 09 02 09 40 00 5608-99 G ch4 CCGG 1807.510 0.910 ... H11 2016 11 14 14 23 00 -34.3523 18.4891 260.00 230.00 30.00 416384 CPT 2016 09 30 09 15 00 4826-99 G ch4 CCGG 1806.200 0.910 ... H11 2016 11 14 13 36 00 -34.3523 18.4891 260.00 230.00 30.00 416381 CPT 2016 09 30 09 15 00 5426-99 G ch4 CCGG 1805.730 0.910 ... H11 2016 11 14 13 52 00 -34.3523 18.4891 260.00 230.00 30.00 416382 CPT 2016 10 10 09 25 00 1799-99 G ch4 CCGG 1808.370 0.910 ... H11 2016 11 14 13 04 00 -34.3523 18.4891 260.00 230.00 30.00 416380 CPT 2016 10 10 09 25 00 3288-99 G ch4 CCGG 1809.620 0.910 ... H11 2016 11 14 13 20 00 -34.3523 18.4891 260.00 230.00 30.00 416373 CPT 2016 10 11 09 00 00 5277-99 G ch4 CCGG 1806.970 0.910 ... H11 2016 11 10 12 11 00 -34.3523 18.4891 260.00 230.00 30.00 416372 CPT 2016 10 11 09 00 00 707-99 G ch4 CCGG 1805.350 0.910 ... H11 2016 11 10 11 55 00 -34.3523 18.4891 260.00 230.00 30.00 416371 CPT 2016 10 21 08 50 00 3298-99 G ch4 CCGG 1802.940 0.910 ... H11 2016 11 10 12 27 00 -34.3523 18.4891 260.00 230.00 30.00 416379 CPT 2016 10 21 08 50 00 3887-99 G ch4 CCGG 1802.160 0.910 ... H11 2016 11 10 12 42 00 -34.3523 18.4891 260.00 230.00 30.00 416374 CPT 2016 10 28 08 55 00 2831-99 G ch4 CCGG 1802.470 0.910 ... H11 2016 11 21 13 05 00 -34.3523 18.4891 260.00 230.00 30.00 416966 CPT 2016 10 28 08 55 00 960-99 G ch4 CCGG 1803.820 0.910 ... H11 2016 11 21 12 50 00 -34.3523 18.4891 260.00 230.00 30.00 416965 CPT 2016 11 04 09 15 00 14-99 G ch4 CCGG 1803.080 0.910 ... H11 2016 11 18 13 39 00 -34.3523 18.4891 260.00 230.00 30.00 416973 CPT 2016 11 24 09 25 00 901-99 G ch4 CCGG 1795.670 0.910 ... H11 2017 02 15 16 22 00 -34.3523 18.4891 260.00 230.00 30.00 420763 CPT 2016 11 24 09 25 00 937-99 G ch4 CCGG 1795.960 0.910 ... H11 2017 02 15 16 06 00 -34.3523 18.4891 260.00 230.00 30.00 420764 CPT 2016 12 19 09 25 00 2793-99 G ch4 CCGG 1792.580 0.910 ... H11 2017 02 15 15 50 00 -34.3523 18.4891 260.00 230.00 30.00 420765 CPT 2016 12 19 09 25 00 535-99 G ch4 CCGG 1791.930 0.910 ... H11 2017 02 15 15 34 00 -34.3523 18.4891 260.00 230.00 30.00 420766 CPT 2016 12 22 10 15 00 1875-99 G ch4 CCGG 1787.290 0.910 ... H11 2017 02 16 14 51 00 -34.3523 18.4891 260.00 230.00 30.00 420653 CPT 2016 12 22 10 15 00 2754-99 G ch4 CCGG 1787.920 0.910 ... H11 2017 02 16 15 06 00 -34.3523 18.4891 260.00 230.00 30.00 420654 CPT 2017 01 12 08 41 00 3540-99 G ch4 CCGG 1781.710 0.910 ... H11 2017 02 16 14 19 00 -34.3523 18.4891 260.00 230.00 30.00 420657 CPT 2017 01 12 08 41 00 3725-99 G ch4 CCGG 1781.470 0.910 ... H11 2017 02 16 14 35 00 -34.3523 18.4891 260.00 230.00 30.00 420658 CPT 2017 01 24 09 45 00 2019-99 G ch4 CCGG 1776.430 0.910 ... H11 2017 02 16 13 15 00 -34.3523 18.4891 260.00 230.00 30.00 420651 CPT 2017 01 24 09 45 00 2254-99 G ch4 CCGG 1776.450 0.910 ... H11 2017 02 16 13 31 00 -34.3523 18.4891 260.00 230.00 30.00 420652 CPT 2017 01 30 09 30 00 3201-99 G ch4 CCGG 1778.760 0.910 ... H11 2017 02 16 14 03 00 -34.3523 18.4891 260.00 230.00 30.00 420655 CPT 2017 01 30 09 30 00 716-99 G ch4 CCGG 1778.140 0.910 ... H11 2017 02 16 13 47 00 -34.3523 18.4891 260.00 230.00 30.00 420656 CPT 2017 02 16 11 57 00 211-99 G ch4 CCGG 1775.010 0.910 ... H11 2017 04 11 14 59 00 -34.3523 18.4891 260.00 230.00 30.00 423453 CPT 2017 02 16 11 57 00 415-99 G ch4 CCGG 1774.720 0.910 ... H11 2017 04 11 14 43 00 -34.3523 18.4891 260.00 230.00 30.00 423454 CPT 2017 03 06 11 00 00 377-99 G ch4 CCGG 1795.280 0.910 ... H11 2017 04 11 14 12 00 -34.3523 18.4891 260.00 230.00 30.00 423455 CPT 2017 03 06 11 00 00 4891-99 G ch4 CCGG 1795.830 0.910 ... H11 2017 04 11 14 27 00 -34.3523 18.4891 260.00 230.00 30.00 423456 CPT 2017 03 15 08 50 00 1432-99 G ch4 CCGG 1779.080 0.910 ... H11 2017 07 14 14 31 00 -34.3523 18.4891 260.00 230.00 30.00 427561 CPT 2017 03 15 08 50 00 4541-99 G ch4 CCGG 1778.780 0.910 ... H11 2017 07 14 14 47 00 -34.3523 18.4891 260.00 230.00 30.00 427562 CPT 2017 03 23 10 45 00 2317-99 G ch4 CCGG 1784.060 0.910 ... H11 2017 07 14 13 59 00 -34.3523 18.4891 260.00 230.00 30.00 427563 CPT 2017 03 23 10 45 00 2386-99 G ch4 CCGG 1785.030 0.910 ... H11 2017 07 14 14 15 00 -34.3523 18.4891 260.00 230.00 30.00 427564 CPT 2017 03 27 07 37 00 289-99 G ch4 CCGG 1781.790 0.910 ... H11 2017 07 13 12 56 00 -34.3523 18.4891 260.00 230.00 30.00 427559 CPT 2017 03 27 07 37 00 4866-99 G ch4 CCGG 1780.790 0.910 ... H11 2017 07 13 13 12 00 -34.3523 18.4891 260.00 230.00 30.00 427560 CPT 2017 05 11 09 10 00 2800-99 G ch4 CCGG 1791.530 0.910 ... H11 2017 07 13 12 24 00 -34.3523 18.4891 260.00 230.00 30.00 427557 CPT 2017 05 11 09 10 00 4686-99 G ch4 CCGG 1792.100 0.910 ... H11 2017 07 13 12 40 00 -34.3523 18.4891 260.00 230.00 30.00 427558 CPT 2017 06 12 09 30 00 1080-99 G ch4 CCGG 1805.350 0.910 ... H11 2017 07 14 15 03 00 -34.3523 18.4891 260.00 230.00 30.00 427567 CPT 2017 06 12 09 30 00 4922-99 G ch4 CCGG 1804.910 0.910 ... H11 2017 07 14 15 19 00 -34.3523 18.4891 260.00 230.00 30.00 427568 CPT 2017 06 19 11 45 00 1127-99 G ch4 CCGG 1805.240 0.910 ... H11 2017 07 14 15 34 00 -34.3523 18.4891 260.00 230.00 30.00 427565 CPT 2017 06 19 11 45 00 2436-99 G ch4 CCGG 1804.890 0.910 ... H11 2017 07 14 15 50 00 -34.3523 18.4891 260.00 230.00 30.00 427566 CPT 2017 07 18 09 15 00 3213-99 G ch4 CCGG 1817.390 0.910 ... H11 2017 08 18 13 40 00 -34.3523 18.4891 260.00 230.00 30.00 429336 CPT 2017 07 18 09 15 00 3281-99 G ch4 CCGG 1817.290 0.910 ... H11 2017 08 18 13 56 00 -34.3523 18.4891 260.00 230.00 30.00 429337 CPT 2017 07 20 09 30 00 1753-99 G ch4 CCGG 1816.420 0.910 ... H11 2017 08 18 13 08 00 -34.3523 18.4891 260.00 230.00 30.00 429334 CPT 2017 07 20 09 30 00 4682-99 G ch4 CCGG 1817.360 0.910 ... H11 2017 08 18 13 24 00 -34.3523 18.4891 260.00 230.00 30.00 429335 CPT 2017 08 03 10 56 00 2171-99 G ch4 CCGG 1815.210 0.910 ... H11 2017 11 30 08 58 00 -34.3523 18.4891 260.00 230.00 30.00 434712 CPT 2017 08 03 10 56 00 3892-99 G ch4 CCGG 1814.850 0.910 ... H11 2017 11 30 09 14 00 -34.3523 18.4891 260.00 230.00 30.00 434713 CPT 2017 08 16 10 20 00 2730-99 G ch4 CCGG 1815.610 0.910 ... H11 2017 11 30 09 45 00 -34.3523 18.4891 260.00 230.00 30.00 434709 CPT 2017 08 16 10 20 00 695-99 G ch4 CCGG 1816.990 0.910 ... H11 2017 11 30 09 30 00 -34.3523 18.4891 260.00 230.00 30.00 434708 CPT 2017 10 05 11 44 00 5336-99 G ch4 CCGG 1816.040 0.910 ... H11 2017 11 29 16 47 00 -34.3523 18.4891 260.00 230.00 30.00 434707 CPT 2017 10 05 11 44 00 989-99 G ch4 CCGG 1816.440 0.910 ... H11 2017 11 29 16 32 00 -34.3523 18.4891 260.00 230.00 30.00 434706 CPT 2017 11 01 07 35 00 1875-99 G ch4 CCGG 1815.000 0.910 ... H11 2017 11 29 17 03 00 -34.3523 18.4891 260.00 230.00 30.00 434710 CPT 2017 11 01 07 35 00 3610-99 G ch4 CCGG 1814.210 0.910 ... H11 2017 11 29 17 19 00 -34.3523 18.4891 260.00 230.00 30.00 434711 CPT 2017 11 09 10 08 00 2010-99 G ch4 CCGG 1811.930 0.910 ... H11 2018 02 13 11 40 00 -34.3523 18.4891 260.00 230.00 30.00 438025 CPT 2017 11 09 10 08 00 3745-99 G ch4 CCGG 1811.310 0.910 ... H11 2018 02 13 11 56 00 -34.3523 18.4891 260.00 230.00 30.00 438026 CPT 2017 12 13 11 05 00 2568-99 G ch4 CCGG 1798.250 0.910 ... H11 2018 02 13 13 00 00 -34.3523 18.4891 260.00 230.00 30.00 438027 CPT 2017 12 13 11 05 00 4319-99 G ch4 CCGG 1799.200 0.910 ... H11 2018 02 13 12 44 00 -34.3523 18.4891 260.00 230.00 30.00 438028 CPT 2018 02 06 11 05 00 3599-99 G ch4 CCGG 1790.200 0.910 ... H11 2018 03 28 11 26 00 -34.3523 18.4891 260.00 230.00 30.00 440682 CPT 2018 02 06 11 05 00 3818-99 G ch4 CCGG 1789.660 0.910 ... H11 2018 03 28 11 11 00 -34.3523 18.4891 260.00 230.00 30.00 440683 CPT 2018 02 15 09 16 00 1284-99 G ch4 CCGG 1788.300 0.910 ... H11 2018 03 26 14 26 00 -34.3523 18.4891 260.00 230.00 30.00 440662 CPT 2018 02 15 09 16 00 2293-99 G ch4 CCGG 1787.780 0.910 ... H11 2018 03 26 14 42 00 -34.3523 18.4891 260.00 230.00 30.00 440663 CPT 2018 04 05 12 36 00 1531-99 G ch4 CCGG 1803.150 0.910 ... H11 2018 06 01 14 45 00 -34.3523 18.4891 260.00 230.00 30.00 444472 CPT 2018 04 05 12 36 00 3178-99 G ch4 CCGG 1802.140 0.910 ... H11 2018 06 01 15 01 00 -34.3523 18.4891 260.00 230.00 30.00 444473 CPT 2018 04 12 10 41 00 2781-99 G ch4 CCGG 1814.000 0.910 .X. H11 2018 06 01 13 42 00 -34.3523 18.4891 260.00 230.00 30.00 444468 CPT 2018 04 12 10 41 00 4957-99 G ch4 CCGG 1815.170 0.910 .X. H11 2018 06 01 13 58 00 -34.3523 18.4891 260.00 230.00 30.00 444469 CPT 2018 04 18 13 10 00 1712-99 G ch4 CCGG 1810.330 0.910 ... H11 2018 06 01 13 10 00 -34.3523 18.4891 260.00 230.00 30.00 444470 CPT 2018 04 18 13 10 00 5291-99 G ch4 CCGG 1809.500 0.910 ... H11 2018 06 01 13 26 00 -34.3523 18.4891 260.00 230.00 30.00 444471 CPT 2018 04 19 09 20 00 2147-99 G ch4 CCGG 1810.870 0.910 ... H11 2018 06 01 14 14 00 -34.3523 18.4891 260.00 230.00 30.00 444466 CPT 2018 04 19 09 20 00 2660-99 G ch4 CCGG 1810.030 0.910 ... H11 2018 06 01 14 30 00 -34.3523 18.4891 260.00 230.00 30.00 444467 CPT 2018 04 23 12 27 00 105-99 G ch4 CCGG 1808.440 0.910 ... H11 2018 06 20 13 57 00 -34.3523 18.4891 260.00 230.00 30.00 445369 CPT 2018 04 23 12 27 00 161-99 G ch4 CCGG 1809.210 0.910 ... H11 2018 06 20 14 13 00 -34.3523 18.4891 260.00 230.00 30.00 445370 CPT 2018 04 26 12 15 00 3905-99 G ch4 CCGG 1802.040 0.910 ... H11 2018 06 20 14 45 00 -34.3523 18.4891 260.00 230.00 30.00 445372 CPT 2018 04 26 12 15 00 4181-99 G ch4 CCGG 1802.120 0.910 ... H11 2018 06 20 14 29 00 -34.3523 18.4891 260.00 230.00 30.00 445371 CPT 2018 05 03 08 18 00 2973-99 G ch4 CCGG 1807.350 0.910 ... H11 2018 06 26 14 48 00 -34.3523 18.4891 260.00 230.00 30.00 445444 CPT 2018 05 03 08 18 00 3086-99 G ch4 CCGG 1806.090 0.910 ... H11 2018 06 26 15 04 00 -34.3523 18.4891 260.00 230.00 30.00 445445 CPT 2018 05 10 09 45 00 1755-99 G ch4 CCGG 1881.870 0.910 N.. H11 2018 06 26 15 20 00 -34.3523 18.4891 260.00 230.00 30.00 445442 CPT 2018 05 10 09 45 00 806-99 G ch4 CCGG 1899.790 0.910 N.. H11 2018 06 26 15 36 00 -34.3523 18.4891 260.00 230.00 30.00 445443 CPT 2018 05 24 10 08 00 4894-99 G ch4 CCGG 1807.790 0.907 ... H11 2018 08 09 10 21 00 -34.3523 18.4891 260.00 230.00 30.00 447229 CPT 2018 05 24 10 08 00 5678-99 G ch4 CCGG 1808.120 0.907 ... H11 2018 08 09 10 37 00 -34.3523 18.4891 260.00 230.00 30.00 447230 CPT 2018 06 18 11 24 00 3840-99 G ch4 CCGG 1815.580 0.907 ... H11 2018 08 09 10 05 00 -34.3523 18.4891 260.00 230.00 30.00 447231 CPT 2018 06 18 11 24 00 836-99 G ch4 CCGG 1816.090 0.907 ... H11 2018 08 09 09 49 00 -34.3523 18.4891 260.00 230.00 30.00 447232 CPT 2018 07 12 10 28 00 3475-99 G ch4 CCGG 1820.090 0.907 ... H11 2018 09 18 17 30 00 -34.3523 18.4891 260.00 230.00 30.00 448934 CPT 2018 07 12 10 28 00 5166-99 G ch4 CCGG 1820.800 0.907 ... H11 2018 09 18 17 46 00 -34.3523 18.4891 260.00 230.00 30.00 448933 CPT 2018 07 30 09 20 00 1682-99 G ch4 CCGG 1828.210 0.907 ... H11 2018 09 19 12 30 00 -34.3523 18.4891 260.00 230.00 30.00 448932 CPT 2018 07 30 09 20 00 2331-99 G ch4 CCGG 1828.350 0.907 ... H11 2018 09 19 12 14 00 -34.3523 18.4891 260.00 230.00 30.00 448931 CPT 2018 08 06 09 45 00 5334-99 G ch4 CCGG 1826.510 0.907 ... H11 2018 09 14 10 38 00 -34.3523 18.4891 260.00 230.00 30.00 448969 CPT 2018 08 06 09 45 00 5863-99 G ch4 CCGG 1826.580 0.907 ... H11 2018 09 14 10 54 00 -34.3523 18.4891 260.00 230.00 30.00 448970 CPT 2018 08 06 10 10 00 4927-99 G ch4 CCGG 1825.800 0.907 ... H11 2018 09 14 10 22 00 -34.3523 18.4891 260.00 230.00 30.00 448968 CPT 2018 08 06 10 10 00 587-99 G ch4 CCGG 1827.660 0.907 ... H11 2018 09 14 10 06 00 -34.3523 18.4891 260.00 230.00 30.00 448967 CPT 2018 08 13 09 45 00 4545-99 G ch4 CCGG 1827.270 0.907 ... H11 2018 09 14 11 09 00 -34.3523 18.4891 260.00 230.00 30.00 448971 CPT 2018 08 13 09 45 00 4706-99 G ch4 CCGG 1826.170 0.907 ... H11 2018 09 14 11 25 00 -34.3523 18.4891 260.00 230.00 30.00 448972 CPT 2018 08 27 09 30 00 5446-99 G ch4 CCGG 1829.560 0.907 ... H11 2018 09 14 11 57 00 -34.3523 18.4891 260.00 230.00 30.00 448973 CPT 2018 08 27 09 30 00 65-99 G ch4 CCGG 1829.070 0.907 ... H11 2018 09 14 11 41 00 -34.3523 18.4891 260.00 230.00 30.00 448974 CPT 2018 09 03 10 05 00 2623-99 G ch4 CCGG 1828.380 0.907 ... H11 2018 10 18 13 35 00 -34.3523 18.4891 260.00 230.00 30.00 450329 CPT 2018 09 03 10 05 00 2970-99 G ch4 CCGG 1829.160 0.907 ... H11 2018 10 18 13 19 00 -34.3523 18.4891 260.00 230.00 30.00 450328 CPT 2018 09 13 09 10 00 1184-99 G ch4 CCGG 1827.950 0.907 ... H11 2018 10 18 13 51 00 -34.3523 18.4891 260.00 230.00 30.00 450330 CPT 2018 09 13 09 10 00 1335-99 G ch4 CCGG 1828.060 0.907 ... H11 2018 10 18 14 06 00 -34.3523 18.4891 260.00 230.00 30.00 450331 CPT 2018 09 17 13 00 00 3173-99 G ch4 CCGG 1826.770 0.907 ... H11 2018 10 17 16 28 00 -34.3523 18.4891 260.00 230.00 30.00 450324 CPT 2018 09 17 13 00 00 955-99 G ch4 CCGG 1826.340 0.907 ... H11 2018 10 17 16 12 00 -34.3523 18.4891 260.00 230.00 30.00 450325 CPT 2018 09 25 11 03 00 2264-99 G ch4 CCGG 1828.360 0.907 ... H11 2018 10 18 09 38 00 -34.3523 18.4891 260.00 230.00 30.00 450320 CPT 2018 09 25 11 03 00 4619-99 G ch4 CCGG 1828.220 0.907 ... H11 2018 10 18 09 54 00 -34.3523 18.4891 260.00 230.00 30.00 450321 CPT 2018 09 27 11 22 00 5314-99 G ch4 CCGG 1826.510 0.907 ... H11 2018 10 18 12 32 00 -34.3523 18.4891 260.00 230.00 30.00 450327 CPT 2018 09 27 11 22 00 698-99 G ch4 CCGG 1825.430 0.907 ... H11 2018 10 18 12 16 00 -34.3523 18.4891 260.00 230.00 30.00 450326 CPT 2018 10 01 12 30 00 3670-99 G ch4 CCGG 1825.990 0.907 ... H11 2018 10 18 10 25 00 -34.3523 18.4891 260.00 230.00 30.00 450323 CPT 2018 10 01 12 30 00 437-99 G ch4 CCGG 1825.400 0.907 ... H11 2018 10 18 10 09 00 -34.3523 18.4891 260.00 230.00 30.00 450322 CPT 2018 10 15 08 36 00 1573-99 G ch4 CCGG 1825.390 0.907 ... H11 2019 02 21 15 58 00 -34.3523 18.4891 260.00 230.00 30.00 454413 CPT 2018 10 15 08 36 00 5645-99 G ch4 CCGG 1824.650 0.907 ... H11 2019 02 21 16 14 00 -34.3523 18.4891 260.00 230.00 30.00 454414 CPT 2018 11 06 10 50 00 2479-99 G ch4 CCGG 1821.890 0.907 ... H11 2019 02 21 16 46 00 -34.3523 18.4891 260.00 230.00 30.00 454412 CPT 2018 11 06 10 50 00 3194-99 G ch4 CCGG 1822.080 0.907 ... H11 2019 02 21 16 30 00 -34.3523 18.4891 260.00 230.00 30.00 454411 CPT 2018 11 20 08 20 00 1386-99 G ch4 CCGG 1816.350 0.907 ... H11 2019 02 20 18 08 00 -34.3523 18.4891 260.00 230.00 30.00 454347 CPT 2018 11 20 08 20 00 4673-99 G ch4 CCGG 1814.060 0.907 ... H11 2019 02 20 18 23 00 -34.3523 18.4891 260.00 230.00 30.00 454348 CPT 2018 12 03 11 12 00 1659-99 G ch4 CCGG 1815.610 0.907 ... H11 2019 02 20 17 36 00 -34.3523 18.4891 260.00 230.00 30.00 454349 CPT 2018 12 03 11 12 00 2974-99 G ch4 CCGG 1814.710 0.907 ... H11 2019 02 20 17 52 00 -34.3523 18.4891 260.00 230.00 30.00 454350 CPT 2018 12 06 09 00 00 2396-99 G ch4 CCGG 1808.170 0.907 ... H11 2019 02 21 10 42 00 -34.3523 18.4891 260.00 230.00 30.00 454351 CPT 2018 12 06 09 00 00 4027-99 G ch4 CCGG 1808.770 0.907 ... H11 2019 02 21 10 58 00 -34.3523 18.4891 260.00 230.00 30.00 454352 CPT 2018 12 06 13 45 00 1156-99 G ch4 CCGG 1805.860 0.907 ... H11 2019 02 21 15 27 00 -34.3523 18.4891 260.00 230.00 30.00 454409 CPT 2018 12 06 13 45 00 3614-99 G ch4 CCGG 1806.350 0.907 ... H11 2019 02 21 15 42 00 -34.3523 18.4891 260.00 230.00 30.00 454410 CPT 2019 01 10 10 00 00 114-99 G ch4 CCGG 1814.750 0.907 .X. H11 2019 03 07 09 09 00 -34.3523 18.4891 260.00 230.00 30.00 455173 CPT 2019 01 10 10 00 00 3470-99 G ch4 CCGG 1814.380 0.907 .X. H11 2019 03 07 09 25 00 -34.3523 18.4891 260.00 230.00 30.00 455174 CPT 2019 01 14 11 50 00 2546-99 G ch4 CCGG 1799.940 0.907 ... H11 2019 03 07 09 56 00 -34.3523 18.4891 260.00 230.00 30.00 455172 CPT 2019 01 14 11 50 00 620-99 G ch4 CCGG 1799.430 0.907 ... H11 2019 03 07 09 41 00 -34.3523 18.4891 260.00 230.00 30.00 455171 CPT 2019 01 21 12 15 00 2033-99 G ch4 CCGG 1800.030 0.907 ... H11 2019 03 07 10 28 00 -34.3523 18.4891 260.00 230.00 30.00 455177 CPT 2019 01 21 12 15 00 5460-99 G ch4 CCGG 1799.610 0.907 ... H11 2019 03 07 10 12 00 -34.3523 18.4891 260.00 230.00 30.00 455178 CPT 2019 01 31 12 40 00 167-99 G ch4 CCGG 1796.320 0.907 ... H11 2019 03 07 10 44 00 -34.3523 18.4891 260.00 230.00 30.00 455175 CPT 2019 01 31 12 40 00 5717-99 G ch4 CCGG 1797.390 0.907 ... H11 2019 03 07 11 00 00 -34.3523 18.4891 260.00 230.00 30.00 455176 CPT 2019 03 07 12 34 56 1940-99 G ch4 CCGG 1800.320 0.907 ... H11 2019 03 25 12 33 00 -34.3523 18.4891 260.00 230.00 30.00 456039 CPT 2019 03 07 12 34 56 980-99 G ch4 CCGG 1801.370 0.907 ... H11 2019 03 25 12 18 00 -34.3523 18.4891 260.00 230.00 30.00 456040 CPT 2019 03 11 09 30 00 3991-99 G ch4 CCGG 1807.420 0.907 ... H11 2019 03 25 11 11 00 -34.3523 18.4891 260.00 230.00 30.00 456028 CPT 2019 03 11 09 30 00 625-99 G ch4 CCGG 1805.360 0.907 ... H11 2019 03 25 11 27 00 -34.3523 18.4891 260.00 230.00 30.00 456027 CPT 2019 03 28 11 28 00 3545-99 G ch4 CCGG 1801.970 0.907 ... H11 2019 06 07 11 02 00 -34.3523 18.4891 260.00 230.00 30.00 459193 CPT 2019 03 28 11 28 00 4017-99 G ch4 CCGG 1801.910 0.907 ... H11 2019 06 07 11 18 00 -34.3523 18.4891 260.00 230.00 30.00 459192 CPT 2019 04 01 09 00 00 2675-99 G ch4 CCGG 1799.000 0.907 ... H11 2019 06 07 10 30 00 -34.3523 18.4891 260.00 230.00 30.00 459194 CPT 2019 04 01 09 00 00 3410-99 G ch4 CCGG 1801.260 0.907 ... H11 2019 06 07 10 46 00 -34.3523 18.4891 260.00 230.00 30.00 459195 CPT 2019 04 04 11 00 00 1197-99 G ch4 CCGG 1805.080 0.907 ... H11 2019 06 07 12 21 00 -34.3523 18.4891 260.00 230.00 30.00 459190 CPT 2019 04 04 11 00 00 2548-99 G ch4 CCGG 1805.120 0.907 ... H11 2019 06 07 12 05 00 -34.3523 18.4891 260.00 230.00 30.00 459191 CPT 2019 04 23 08 45 00 2292-99 G ch4 CCGG 1807.210 0.907 ... H11 2019 06 07 11 33 00 -34.3523 18.4891 260.00 230.00 30.00 459188 CPT 2019 04 23 08 45 00 3510-99 G ch4 CCGG 1807.590 0.907 ... H11 2019 06 07 11 49 00 -34.3523 18.4891 260.00 230.00 30.00 459189 CPT 2019 05 02 12 46 00 3228-99 G ch4 CCGG 1813.960 0.907 ... H11 2019 07 01 15 50 00 -34.3523 18.4891 260.00 230.00 30.00 460434 CPT 2019 05 02 12 46 00 5679-99 G ch4 CCGG 1814.390 0.907 ... H11 2019 07 01 15 34 00 -34.3523 18.4891 260.00 230.00 30.00 460433 CPT 2019 05 27 11 30 00 1193-99 G ch4 CCGG 1813.980 0.907 ... H11 2019 07 01 16 06 00 -34.3523 18.4891 260.00 230.00 30.00 460431 CPT 2019 05 27 11 30 00 798-99 G ch4 CCGG 1813.140 0.907 ... H11 2019 07 01 16 22 00 -34.3523 18.4891 260.00 230.00 30.00 460432 CPT 2019 06 05 09 20 00 1206-99 G ch4 CCGG 1817.350 0.907 ... H11 2019 07 01 12 39 00 -34.3523 18.4891 260.00 230.00 30.00 460436 CPT 2019 06 05 09 20 00 283-99 G ch4 CCGG 1816.660 0.907 ... H11 2019 07 01 12 23 00 -34.3523 18.4891 260.00 230.00 30.00 460435 CPT 2019 06 06 09 12 00 3718-99 G ch4 CCGG 1813.400 0.907 ... H11 2019 07 01 12 55 00 -34.3523 18.4891 260.00 230.00 30.00 460437 CPT 2019 06 06 09 12 00 3727-99 G ch4 CCGG 1813.930 0.907 ... H11 2019 07 01 13 11 00 -34.3523 18.4891 260.00 230.00 30.00 460438 CPT 2019 06 10 11 14 00 2722-99 G ch4 CCGG 1820.730 0.575 ... PC2 2019 10 10 10 44 04 -34.3523 18.4891 260.00 230.00 30.00 465702 CPT 2019 06 10 11 14 00 5496-99 G ch4 CCGG 1820.700 0.575 ... PC2 2019 10 10 10 58 28 -34.3523 18.4891 260.00 230.00 30.00 465703 CPT 2019 06 11 09 15 00 3950-99 G ch4 CCGG 1820.940 0.575 ... PC2 2019 10 10 10 15 19 -34.3523 18.4891 260.00 230.00 30.00 465704 CPT 2019 06 11 09 15 00 4921-99 G ch4 CCGG 1821.000 0.575 ... PC2 2019 10 10 10 29 42 -34.3523 18.4891 260.00 230.00 30.00 465705 CPT 2019 06 24 09 30 00 1863-99 G ch4 CCGG 1820.040 0.575 ... PC2 2019 08 15 14 37 41 -34.3523 18.4891 260.00 230.00 30.00 463242 CPT 2019 06 24 09 30 00 1916-99 G ch4 CCGG 1819.980 0.575 ... PC2 2019 08 15 14 51 58 -34.3523 18.4891 260.00 230.00 30.00 463243 CPT 2019 06 24 10 08 00 239-99 G ch4 CCGG 1819.740 0.575 ... PC2 2019 08 15 14 09 07 -34.3523 18.4891 260.00 230.00 30.00 463550 CPT 2019 06 24 10 08 00 4533-99 G ch4 CCGG 1819.860 0.575 ... PC2 2019 08 15 14 23 24 -34.3523 18.4891 260.00 230.00 30.00 463241 CPT 2019 07 01 09 00 00 2644-99 G ch4 CCGG 1823.430 0.575 ... PC2 2019 08 15 13 11 56 -34.3523 18.4891 260.00 230.00 30.00 463238 CPT 2019 07 01 09 00 00 2903-99 G ch4 CCGG 1823.350 0.575 ... PC2 2019 08 15 13 26 13 -34.3523 18.4891 260.00 230.00 30.00 463239 CPT 2019 07 04 09 29 00 173-99 G ch4 CCGG 1829.630 0.575 ... PC2 2019 08 15 13 54 50 -34.3523 18.4891 260.00 230.00 30.00 463237 CPT 2019 07 04 09 29 00 3949-99 G ch4 CCGG 1829.690 0.575 ... PC2 2019 08 15 13 40 30 -34.3523 18.4891 260.00 230.00 30.00 463236 CPT 2019 07 08 11 30 00 285-99 G ch4 CCGG 1832.180 0.575 ... PC2 2019 08 20 13 48 54 -34.3523 18.4891 260.00 230.00 30.00 463549 CPT 2019 07 08 11 30 00 363-99 G ch4 CCGG 1832.170 0.575 ... PC2 2019 08 20 14 03 13 -34.3523 18.4891 260.00 230.00 30.00 463240 CPT 2019 07 11 09 15 00 2027-99 G ch4 CCGG 1835.850 0.575 ... PC2 2019 08 20 14 17 32 -34.3523 18.4891 260.00 230.00 30.00 463439 CPT 2019 07 11 09 15 00 3257-99 G ch4 CCGG 1836.010 0.575 ... PC2 2019 08 20 14 31 50 -34.3523 18.4891 260.00 230.00 30.00 463440 CPT 2019 07 18 09 30 00 2516-99 G ch4 CCGG 1832.830 0.575 ... PC2 2019 10 09 13 21 54 -34.3523 18.4891 260.00 230.00 30.00 465690 CPT 2019 07 18 09 30 00 3388-99 G ch4 CCGG 1832.680 0.575 ... PC2 2019 10 09 13 36 18 -34.3523 18.4891 260.00 230.00 30.00 465691 CPT 2019 07 23 09 45 00 2952-99 G ch4 CCGG 1830.180 0.575 ... PC2 2019 10 09 13 50 41 -34.3523 18.4891 260.00 230.00 30.00 465692 CPT 2019 07 23 09 45 00 4656-99 G ch4 CCGG 1830.200 0.575 ... PC2 2019 10 09 14 05 05 -34.3523 18.4891 260.00 230.00 30.00 465693 CPT 2019 08 05 09 15 00 3869-99 G ch4 CCGG 1833.560 0.575 ... PC2 2019 10 03 10 15 54 -34.3523 18.4891 260.00 230.00 30.00 465224 CPT 2019 08 05 09 15 00 539-99 G ch4 CCGG 1833.540 0.575 ... PC2 2019 10 03 10 01 32 -34.3523 18.4891 260.00 230.00 30.00 465223 CPT 2019 08 08 11 52 00 4103-99 G ch4 CCGG 1831.470 0.575 ... PC2 2019 10 03 10 30 16 -34.3523 18.4891 260.00 230.00 30.00 465225 CPT 2019 08 08 11 52 00 5649-99 G ch4 CCGG 1831.620 0.575 ... PC2 2019 10 03 10 44 39 -34.3523 18.4891 260.00 230.00 30.00 465226 CPT 2019 08 13 09 45 00 2940-99 G ch4 CCGG 1833.090 0.575 ... PC2 2019 10 25 12 40 55 -34.3523 18.4891 260.00 230.00 30.00 466357 CPT 2019 08 13 09 45 00 3840-99 G ch4 CCGG 1833.140 0.575 ... PC2 2019 10 25 12 55 16 -34.3523 18.4891 260.00 230.00 30.00 466358 CPT 2019 08 29 09 15 00 1316-99 G ch4 CCGG 1836.300 0.575 ... PC2 2019 10 25 13 09 37 -34.3523 18.4891 260.00 230.00 30.00 466355 CPT 2019 08 29 09 15 00 2172-99 G ch4 CCGG 1835.990 0.575 ... PC2 2019 10 25 13 24 00 -34.3523 18.4891 260.00 230.00 30.00 466356 CPT 2019 09 12 09 00 00 2144-99 G ch4 CCGG 1833.670 0.575 ... PC2 2019 10 25 12 12 15 -34.3523 18.4891 260.00 230.00 30.00 466351 CPT 2019 09 12 09 00 00 3524-99 G ch4 CCGG 1833.700 0.575 ... PC2 2019 10 25 12 26 35 -34.3523 18.4891 260.00 230.00 30.00 466352 CPT 2019 09 16 09 01 00 1573-99 G ch4 CCGG 1834.490 0.575 ... PC2 2019 10 25 11 43 28 -34.3523 18.4891 260.00 230.00 30.00 466353 CPT 2019 09 16 09 01 00 4500-99 G ch4 CCGG 1834.590 0.575 ... PC2 2019 10 25 11 57 52 -34.3523 18.4891 260.00 230.00 30.00 466354 CPT 2019 09 19 11 58 00 1432-99 G ch4 CCGG 1852.570 0.575 .X. PC2 2019 10 23 11 52 23 -34.3523 18.4891 260.00 230.00 30.00 466375 CPT 2019 09 19 11 58 00 2621-99 G ch4 CCGG 1852.190 0.575 .X. PC2 2019 10 23 11 38 01 -34.3523 18.4891 260.00 230.00 30.00 466376 CPT 2019 09 23 09 30 00 2942-99 G ch4 CCGG 1833.670 0.575 ... PC2 2019 11 20 14 05 05 -34.3523 18.4891 260.00 230.00 30.00 467554 CPT 2019 09 23 09 30 00 325-99 G ch4 CCGG 1833.670 0.575 ... PC2 2019 11 20 13 50 45 -34.3523 18.4891 260.00 230.00 30.00 467553 CPT 2019 09 30 08 45 00 4218-99 G ch4 CCGG 1833.410 0.575 ... PC2 2019 11 20 14 33 45 -34.3523 18.4891 260.00 230.00 30.00 467552 CPT 2019 09 30 08 45 00 945-99 G ch4 CCGG 1833.180 0.575 ... PC2 2019 11 20 14 19 25 -34.3523 18.4891 260.00 230.00 30.00 467551 CPT 2019 10 10 09 00 00 3161-99 G ch4 CCGG 1834.540 0.575 ... PC2 2019 11 20 14 48 05 -34.3523 18.4891 260.00 230.00 30.00 467555 CPT 2019 10 10 09 00 00 663-99 G ch4 CCGG 1834.620 0.575 ... PC2 2019 11 20 15 02 22 -34.3523 18.4891 260.00 230.00 30.00 467556 CPT 2019 10 14 09 30 00 1163-99 G ch4 CCGG 1831.680 0.575 ... PC2 2019 11 20 15 16 40 -34.3523 18.4891 260.00 230.00 30.00 467557 CPT 2019 10 14 09 30 00 4603-99 G ch4 CCGG 1831.740 0.575 ... PC2 2019 11 20 15 30 57 -34.3523 18.4891 260.00 230.00 30.00 467558 CPT 2019 10 24 13 50 00 1254-99 G ch4 CCGG 1830.770 0.575 ... PC2 2019 11 22 13 23 10 -34.3523 18.4891 260.00 230.00 30.00 467612 CPT 2019 10 24 13 50 00 1623-99 G ch4 CCGG 1832.320 0.575 ... PC2 2019 11 22 13 37 26 -34.3523 18.4891 260.00 230.00 30.00 467613 CPT 2019 10 28 09 45 00 2304-99 G ch4 CCGG 1830.640 0.575 ... PC2 2019 11 22 13 51 43 -34.3523 18.4891 260.00 230.00 30.00 467610 CPT 2019 10 28 09 45 00 5198-99 G ch4 CCGG 1830.720 0.575 ... PC2 2019 11 22 14 05 59 -34.3523 18.4891 260.00 230.00 30.00 467611 CPT 2019 10 28 12 39 00 1724-99 G ch4 CCGG 1830.800 0.575 ... PC2 2020 03 03 10 50 17 -34.3523 18.4891 260.00 230.00 30.00 471492 CPT 2019 10 28 12 39 00 2997-99 G ch4 CCGG 1830.650 0.575 ... PC2 2020 03 03 11 04 38 -34.3523 18.4891 260.00 230.00 30.00 471493 CPT 2019 10 30 11 27 00 1510-99 G ch4 CCGG 1829.290 0.575 ... PC2 2020 03 03 11 18 59 -34.3523 18.4891 260.00 230.00 30.00 471490 CPT 2019 10 30 11 27 00 4285-99 G ch4 CCGG 1829.440 0.575 ... PC2 2020 03 03 11 33 20 -34.3523 18.4891 260.00 230.00 30.00 471491 CPT 2019 11 07 09 17 00 2804-99 G ch4 CCGG 1828.810 0.575 ... PC2 2020 01 15 16 31 39 -34.3523 18.4891 260.00 230.00 30.00 468743 CPT 2019 11 07 09 17 00 2921-99 G ch4 CCGG 1828.750 0.575 ... PC2 2020 01 15 16 46 02 -34.3523 18.4891 260.00 230.00 30.00 468744 CPT 2019 11 18 12 06 00 2353-99 G ch4 CCGG 1826.380 0.575 ... PC2 2020 01 15 16 17 19 -34.3523 18.4891 260.00 230.00 30.00 468746 CPT 2019 11 18 12 06 00 478-99 G ch4 CCGG 1826.270 0.575 ... PC2 2020 01 15 16 02 59 -34.3523 18.4891 260.00 230.00 30.00 468745 CPT 2019 11 25 10 00 00 3437-99 G ch4 CCGG 1822.970 0.575 ... PC2 2020 01 16 11 22 50 -34.3523 18.4891 260.00 230.00 30.00 468676 CPT 2019 11 25 10 00 00 420-99 G ch4 CCGG 1823.420 0.575 ... PC2 2020 01 16 11 08 27 -34.3523 18.4891 260.00 230.00 30.00 468675 CPT 2019 12 02 11 00 00 407-99 G ch4 CCGG 1821.850 0.575 ... PC2 2020 01 16 11 37 13 -34.3523 18.4891 260.00 230.00 30.00 468673 CPT 2019 12 02 11 00 00 4909-99 G ch4 CCGG 1821.780 0.575 ... PC2 2020 01 16 11 51 33 -34.3523 18.4891 260.00 230.00 30.00 468674 CPT 2019 12 17 09 03 00 4490-99 G ch4 CCGG 1817.100 0.575 ... PC2 2020 02 19 15 16 43 -34.3523 18.4891 260.00 230.00 30.00 470514 CPT 2019 12 17 09 03 00 4612-99 G ch4 CCGG 1816.960 0.575 ... PC2 2020 02 19 15 31 09 -34.3523 18.4891 260.00 230.00 30.00 470515 CPT 2019 12 19 09 45 00 401-99 G ch4 CCGG 1816.720 0.575 ... PC2 2020 02 19 14 48 01 -34.3523 18.4891 260.00 230.00 30.00 470512 CPT 2019 12 19 09 45 00 5535-99 G ch4 CCGG 1816.580 0.575 ... PC2 2020 02 19 15 02 22 -34.3523 18.4891 260.00 230.00 30.00 470513 CPT 2020 01 16 09 15 00 3085-99 G ch4 CCGG 1803.750 0.575 ... PC2 2020 02 19 13 22 06 -34.3523 18.4891 260.00 230.00 30.00 470506 CPT 2020 01 16 09 15 00 3982-99 G ch4 CCGG 1803.900 0.575 ... PC2 2020 02 19 13 36 24 -34.3523 18.4891 260.00 230.00 30.00 470507 CPT 2020 01 20 08 45 00 1522-99 G ch4 CCGG 1808.940 0.575 ... PC2 2020 02 19 12 53 25 -34.3523 18.4891 260.00 230.00 30.00 470504 CPT 2020 01 20 08 45 00 4732-99 G ch4 CCGG 1808.760 0.575 ... PC2 2020 02 19 13 07 43 -34.3523 18.4891 260.00 230.00 30.00 470505 CPT 2020 01 30 09 45 00 1481-99 G ch4 CCGG 1809.170 0.575 ... PC2 2020 03 04 10 27 42 -34.3523 18.4891 260.00 230.00 30.00 471542 CPT 2020 01 30 09 45 00 5224-99 G ch4 CCGG 1809.190 0.575 ... PC2 2020 03 04 10 42 03 -34.3523 18.4891 260.00 230.00 30.00 471543 CPT 2020 02 03 09 45 00 1700-99 G ch4 CCGG 1885.730 0.575 .X. PC2 2020 03 04 10 13 23 -34.3523 18.4891 260.00 230.00 30.00 471545 CPT 2020 02 03 09 45 00 219-99 G ch4 CCGG 1883.990 0.575 .X. PC2 2020 03 04 09 59 03 -34.3523 18.4891 260.00 230.00 30.00 471544 CPT 2020 02 06 09 23 00 2634-99 G ch4 CCGG 1804.050 0.575 ... PC2 2020 04 08 15 27 21 -34.3523 18.4891 260.00 230.00 30.00 472610 CPT 2020 02 06 09 23 00 3652-99 G ch4 CCGG 1804.150 0.575 ... PC2 2020 04 08 15 41 40 -34.3523 18.4891 260.00 230.00 30.00 472611 CPT 2020 02 18 11 00 00 3640-99 G ch4 CCGG 1804.640 0.575 ... PC2 2020 04 08 14 30 06 -34.3523 18.4891 260.00 230.00 30.00 472608 CPT 2020 02 18 11 00 00 4687-99 G ch4 CCGG 1804.780 0.575 ... PC2 2020 04 08 14 44 25 -34.3523 18.4891 260.00 230.00 30.00 472609 CPT 2020 02 24 10 03 00 3882-99 G ch4 CCGG 1804.910 0.575 ... PC2 2020 04 09 11 09 57 -34.3523 18.4891 260.00 230.00 30.00 472638 CPT 2020 02 24 10 03 00 3976-99 G ch4 CCGG 1804.890 0.575 ... PC2 2020 04 09 11 24 19 -34.3523 18.4891 260.00 230.00 30.00 472639 CPT 2020 03 02 10 47 00 3539-99 G ch4 CCGG 1802.240 0.575 ... PC2 2020 04 09 11 38 40 -34.3523 18.4891 260.00 230.00 30.00 472634 CPT 2020 03 02 10 47 00 5452-99 G ch4 CCGG 1802.330 0.575 ... PC2 2020 04 09 11 53 05 -34.3523 18.4891 260.00 230.00 30.00 472635 CPT 2020 03 12 11 40 00 2692-99 G ch4 CCGG 1809.310 0.575 ... PC2 2020 04 09 10 41 12 -34.3523 18.4891 260.00 230.00 30.00 472636 CPT 2020 03 12 11 40 00 4257-99 G ch4 CCGG 1809.670 0.575 ... PC2 2020 04 09 10 55 33 -34.3523 18.4891 260.00 230.00 30.00 472637 CPT 2020 03 16 10 59 00 1145-99 G ch4 CCGG 1806.120 0.575 ... PC2 2020 04 09 10 26 57 -34.3523 18.4891 260.00 230.00 30.00 472632 CPT 2020 03 16 10 59 00 779-99 G ch4 CCGG 1806.090 0.575 ... PC2 2020 04 09 10 12 35 -34.3523 18.4891 260.00 230.00 30.00 472633 CPT 2020 03 23 10 00 00 3307-99 G ch4 CCGG 1807.830 0.575 ... PC2 2020 11 17 13 18 03 -34.3523 18.4891 260.00 230.00 30.00 482273 CPT 2020 03 23 10 00 00 420-99 G ch4 CCGG 1807.910 0.575 ... PC2 2020 11 17 13 32 19 -34.3523 18.4891 260.00 230.00 30.00 482274 CPT 2020 03 25 10 30 00 3437-99 G ch4 CCGG 1812.310 0.575 ... PC2 2020 11 17 13 46 38 -34.3523 18.4891 260.00 230.00 30.00 482271 CPT 2020 03 25 10 30 00 4491-99 G ch4 CCGG 1812.200 0.575 ... PC2 2020 11 17 14 00 59 -34.3523 18.4891 260.00 230.00 30.00 482272 CPT 2020 06 10 08 45 00 1440-99 G ch4 CCGG 1824.390 0.575 ... PC2 2020 11 17 14 43 51 -34.3523 18.4891 260.00 230.00 30.00 482275 CPT 2020 06 10 08 45 00 2859-99 G ch4 CCGG 1824.250 0.575 ... PC2 2020 11 17 14 58 08 -34.3523 18.4891 260.00 230.00 30.00 482276 CPT 2020 06 10 13 15 00 2254-99 G ch4 CCGG 1823.580 0.575 ... PC2 2020 11 17 14 15 16 -34.3523 18.4891 260.00 230.00 30.00 482277 CPT 2020 06 10 13 15 00 5331-99 G ch4 CCGG 1823.700 0.575 ... PC2 2020 11 17 14 29 33 -34.3523 18.4891 260.00 230.00 30.00 482278 CPT 2020 06 24 08 45 00 4024-99 G ch4 CCGG 1924.370 0.575 .X. PC2 2020 12 08 13 54 43 -34.3523 18.4891 260.00 230.00 30.00 483033 CPT 2020 06 24 08 45 00 5703-99 G ch4 CCGG 1915.220 0.575 .X. PC2 2020 12 08 14 09 00 -34.3523 18.4891 260.00 230.00 30.00 483034 CPT 2020 07 02 09 37 00 2451-99 G ch4 CCGG 1849.970 0.575 .X. PC2 2020 12 07 12 44 44 -34.3523 18.4891 260.00 230.00 30.00 482815 CPT 2020 07 02 09 37 00 2917-99 G ch4 CCGG 1850.140 0.575 .X. PC2 2020 12 07 12 30 25 -34.3523 18.4891 260.00 230.00 30.00 482814 CPT 2020 08 06 11 12 00 3613-99 G ch4 CCGG 1898.950 0.575 .X. PC2 2021 07 01 11 10 04 -34.3523 18.4891 260.00 230.00 30.00 491128 CPT 2020 08 06 11 12 00 606-99 G ch4 CCGG 1898.100 0.575 .X. PC2 2021 07 01 11 25 04 -34.3523 18.4891 260.00 230.00 30.00 491129 CPT 2020 08 11 09 16 00 2109-99 G ch4 CCGG 1840.910 0.575 ... PC2 2021 06 30 17 46 50 -34.3523 18.4891 260.00 230.00 30.00 491130 CPT 2020 08 11 09 16 00 2804-99 G ch4 CCGG 1840.860 0.575 ... PC2 2021 06 30 18 01 37 -34.3523 18.4891 260.00 230.00 30.00 491131 CPT 2020 11 19 09 26 00 2300-99 G ch4 CCGG 1835.770 0.575 ... PC2 2021 02 23 10 22 40 -34.3523 18.4891 260.00 230.00 30.00 485519 CPT 2020 11 19 09 26 00 2942-99 G ch4 CCGG 1835.850 0.575 ... PC2 2021 02 23 10 36 56 -34.3523 18.4891 260.00 230.00 30.00 485520 CPT 2020 11 23 08 30 00 2631-99 G ch4 CCGG 1835.400 0.575 ... PC2 2021 02 23 09 54 08 -34.3523 18.4891 260.00 230.00 30.00 485521 CPT 2020 11 23 08 30 00 5510-99 G ch4 CCGG 1835.450 0.575 ... PC2 2021 02 23 10 08 24 -34.3523 18.4891 260.00 230.00 30.00 485522 CPT 2020 12 14 11 30 00 4193-99 G ch4 CCGG 1828.500 0.575 ... PC2 2021 02 23 10 51 12 -34.3523 18.4891 260.00 230.00 30.00 485523 CPT 2020 12 14 11 30 00 5520-99 G ch4 CCGG 1828.630 0.575 ... PC2 2021 02 23 11 05 28 -34.3523 18.4891 260.00 230.00 30.00 485524 CPT 2020 12 21 11 11 00 3836-99 G ch4 CCGG 1827.000 0.575 ... PC2 2021 02 23 12 45 40 -34.3523 18.4891 260.00 230.00 30.00 485525 CPT 2020 12 21 11 11 00 4686-99 G ch4 CCGG 1827.030 0.575 ... PC2 2021 02 23 12 59 57 -34.3523 18.4891 260.00 230.00 30.00 485526 CPT 2020 12 31 08 15 00 1385-99 G ch4 CCGG 1822.710 0.575 ... PC2 2021 02 19 12 55 08 -34.3523 18.4891 260.00 230.00 30.00 485535 CPT 2020 12 31 08 15 00 2783-99 G ch4 CCGG 1822.760 0.575 ... PC2 2021 02 19 13 09 25 -34.3523 18.4891 260.00 230.00 30.00 485536