# header_lines : 164 # # ------------------------------------------------------------->>>> # DATA SET NAME # # dataset_name: ch4_zep_surface-flask_1_ccgg_event # # ------------------------------------------------------------->>>> # DESCRIPTION # # dataset_description: Atmospheric Methane Dry Air Mole Fractions from the NOAA GML Carbon Cycle Cooperative Global Air Sampling Network, 1983-2022 # # ------------------------------------------------------------->>>> # CITATION # # dataset_citation: Lan, X., J.W. Mund, A.M. Crotwell, M.J. Crotwell, E. Moglia, M. Madronich, D. Neff and K.W. Thoning (2023), Atmospheric Methane Dry Air Mole Fractions from the NOAA GML Carbon Cycle Cooperative Global Air Sampling Network, 1983-2022, Version: 2023-08-28, https://doi.org/10.15138/VNCZ-M766 # # ------------------------------------------------------------->>>> # FAIR USE POLICY # # dataset_fair_use: These data are made freely available to the public and the scientific community in the belief that their wide dissemination will lead to greater understanding and new scientific insights. To ensure that GML receives fair credit for their work please include relevant citation text in publications. We encourage users to contact the data providers, who can provide detailed information about the measurements and scientific insight. In cases where the data are central to a publication, coauthorship for data providers may be appropriate. # # ------------------------------------------------------------->>>> # WARNING # # dataset_warning: Every effort is made to produce the most accurate and precise measurements possible. However, we reserve the right to make corrections to the data based on recalibration of standard gases or for other reasons deemed scientifically justified. We are not responsible for results and conclusions based on use of these data without regard to this warning. # # ------------------------------------------------------------->>>> # GLOBAL ATTRIBUTES # # site_code : ZEP # site_name : Ny-Alesund, Svalbard # site_country : Norway and Sweden # site_country_flag : https://gml.noaa.gov/webdata/ccgg/ObsPack/images/flags/NORW0001.GIF # site_latitude : 78.9067 # site_longitude : 11.8883 # site_elevation : 474.0 # site_elevation_unit : masl # site_position_comment : This is the nominal location of the site. The sampling location at many sites has changed over time, and we report here the most recent nominal location. The actual sampling location for each observation is not necessarily the site location. The sampling locations for each observation are reported in the latitude, longitude, and altitude variables. # site_utc2lst : 1.0 # site_utc2lst_comment : Add 'site_utc2lst' hours to convert a time stamp in UTC (Coordinated Universal Time) to LST (Local Standard Time). # dataset_creation_date : 2023-08-28T15:12:28.852086 # dataset_num : 332 # dataset_name : ch4_zep_surface-flask_1_ccgg_event # dataset_parameter : ch4 # dataset_parameter_name : Methane # dataset_parameter_industrial_name : Methane # dataset_project : surface-flask # dataset_platform : fixed # dataset_selection : event # dataset_selection_tag : event # dataset_comment : For more information about these data, please see https://gml.noaa.gov/aftp/data/trace_gases/ch4/flask/README_ch4_surface-flask_ccgg.html # dataset_calibration_scale : CH4_X2004A # dataset_start_date : 1994-02-11T14:30:00Z # dataset_stop_date : 2022-12-29T12:55:00Z # dataset_usage_description : Please cite the product's citation when using data from this dataset. Relevant literature references for this dataset are listed below for convenience. # dataset_provider_license : These data were produced by NOAA and are not subject to copyright protection in the United States. NOAA waives any potential copyright and related rights in these data worldwide through the Creative Commons Zero 1.0 Universal Public Domain Dedication (CC0-1.0). # dataset_reference_total_listed : 1 # dataset_reference_1_name : Dlugokencky, E. J., L. P. Steele, P. M. Lang and K. A. Masarie, (1994), The growth rate and distribution of atmospheric methane, Journal of Geophysical Research, 99, D8, 17, doi:10.1029/94JD01245. # dataset_contribution : These data are provided by NOAA. Principal investigators include Xin Lan (NOAA). Key partners include Kim Holmen (MISU) AND Birgitta Noone (ITM). # lab_total_listed : 1 # lab_1_number : 1 # lab_1_abbr : NOAA # lab_1_name : NOAA Global Monitoring Laboratory # lab_1_address1 : 325 Broadway # lab_1_address2 : NOAA R/GML-1 # lab_1_address3 : Boulder, CO 80305-3328 # lab_1_country : United States # lab_1_url : https://gml.noaa.gov/ccgg/ # lab_1_parameter : Lab has contributed measurements for: ch4 # lab_1_country_flag : https://gml.noaa.gov/webdata/ccgg/ObsPack/images/flags/UNST0001.GIF # lab_1_logo : https://gml.noaa.gov/webdata/ccgg/ObsPack/images/logos/noaa_medium.png # lab_1_ongoing_atmospheric_air_comparison : T # provider_total_listed : 1 # provider_1_name : Xin Lan # provider_1_address1 : NOAA GML # provider_1_address2 : 325 Broadway R/GML-1 # provider_1_address3 : Boulder, CO 80305-3328 # provider_1_country : United States # provider_1_affiliation : National Oceanic and Atmospheric Administration # provider_1_email : Xin.Lan@noaa.gov # provider_1_parameter : Provider has contributed measurements for: ch4 # partner_total_listed : 2 # partner_1_name : Kim Holmen # partner_1_abbr : MISU # partner_1_address1 : Department of Meteorology # partner_1_address2 : Stockholm University Arrhenius Laboratory # partner_1_address3 : SE-106 91 Stockholm Sweden # partner_1_country : Sweden # partner_1_parameter : Partner of measurements for: ch4 # partner_1_affiliation : Zeppelin Station/University of Stockholm Meteorological Institute # partner_1_email : kim.holmen@npolar.no # partner_1_tel : 46 8 16 43 52 # partner_2_name : Birgitta Noone # partner_2_abbr : ITM # partner_2_country : Sweden # partner_2_parameter : Partner of measurements for: ch4 # partner_2_affiliation : Department of Applied Environmental Science, Stockholm University # ------------------------------------------------------------->>>> # VARIABLE ATTRIBUTES # # site_code:long_name : site_name_abbreviation. # site_code:comment : Site code is an abbreviation for the sampling site name. # time_components:_FillValue : -9 # time_components:long_name : integer_components_of_UTC_date/time # time_components:order : year, month, day, hour, minute, second # time_components:comment : Calendar time components as integers. Times and dates are UTC. Time-averaged values are reported at the start of the averaging interval. # datetime:long_name : air_sample_date_and_time_in_UTC # datetime:comment : Air sample date and time in UTC ISO 8601 format. Time-averaged values are reported at the start of the averaging interval. # time_decimal:_FillValue : -999.999 # time_decimal:long_name : sample_decimal_year_in_UTC # time_decimal:comment : decimal year in UTC. Time-averaged values are reported at the start of the averaging interval. # air_sample_container_id:long_name : Air_Sample_Container_ID # air_sample_container_id:comment : ID of air sample container. See provider_comment if available. # value:_FillValue : -999.999 # value:long_name : measured_mole_fraction_of_trace_gas_in_dry_air # value:units : nanomol mol-1 # value:comment : Mole fraction reported in units of nanomol mol-1 (10-9 mol per mol of dry air); abbreviated as ppb (parts per billion). # value:scale_comment : CH4_X2004A # value_unc:_FillValue : -999.999 # value_unc:long_name : estimated_uncertainty_in_reported_value # value_unc:units : nanomol mol-1 # value_unc:comment : This is the estimated uncertainty of the reported value. See provider_comment if available. # latitude:_FillValue : -999.999 # latitude:standard_name : latitude # latitude:long_name : sample_latitude_in_decimal_degrees # latitude:units : degrees_north # latitude:comment : Latitude at which air sample was collected. # longitude:_FillValue : -999.999 # longitude:standard_name : longitude # longitude:long_name : sample_longitude_in_decimal_degrees # longitude:units : degrees_east # longitude:comment : Longitude at which air sample was collected using a range of -180 degrees to +180 degrees. # altitude:_FillValue : -999.999 # altitude:standard_name : altitude # altitude:long_name : sample_altitude_in_meters_above_sea_level # altitude:units : m # altitude:comment : Altitude (in meters above sea level). See provider_comment if available. # altitude:provider_comment : Altitude for this dataset is the sum of surface elevation (masl) and sample intake height (magl). # elevation:_FillValue : -999.999 # elevation:standard_name : elevation # elevation:long_name : surface_elevation_in_meters_above_sea_level # elevation:units : m # elevation:comment : Surface elevation in meters above sea level. See provider_comment if available. # intake_height:_FillValue : -999.999 # intake_height:long_name : sample_intake_height_in_meters_above_ground_level # intake_height:units : m # intake_height:comment : Sample intake height in meters above ground level (magl). See provider_comment if available. # method:long_name : air_sample_collection_method # method:comment : Air sample collection method. See provider_comment if available. # method:provider_comment : A single-character code is used to identify the sample collection method. The codes are: P - Sample collected using a portable, battery powered pumping unit. Two flasks are connected in series, flushed with air, and then pressurized to 1.2 - 1.5 times ambient pressure. D - Similar to P but the air passes through a condenser cooled to about 5 deg C to partially dry the sample. G - Similar to D but with a gold-plated condenser. T - Evacuated flask filled by opening an O-ring sealed stopcock. S - Flasks filled at NOAA GML observatories by sampling air from the in situ CO2 measurement air intake system. N - Before 1981, flasks filled using a hand-held aspirator bulb. After 1981, flasks filled using a pump different from those used in method P, D, or G. F - Five liter evacuated flasks filled by opening a ground glass, greased stopcock # event_number:long_name : Unique_Air_Sample_Event_Number # event_number:comment : Identifies each discrete air sample collected at some time and location with a unique sample event number. The event number (reported as a string) can be used to relate measurements of different trace gases and isotopes from the same sample. # instrument:long_name : instrument_ID_to_detect_atmospheric_parameter # instrument:comment : Instrument ID used to detect atmospheric parameter. See provider_comment if available. # analysis_datetime:long_name : air_sample_measurement_date_and_time_in_LT # analysis_datetime:comment : Air sample measurement date and time in LT. See provider_comment if available. # qcflag:long_name : quality_control_flag # qcflag:comment : This quality control flag is provided by the contributing PIs. See provider_comment if available. # qcflag:provider_comment : This is the NOAA 3-character quality control flag. Column 1 is the REJECTION flag. An alphanumeric other than a period (.) in the FIRST column indicates a sample with obvious problems during collection or analysis. This measurement should not be interpreted. Column 2 is the SELECTION flag. An alphanumeric other than a period (.) in the SECOND column indicates a sample that is likely valid but does not meet selection criteria determined by the goals of a particular investigation. For example, it might not have been obtained during 'background' conditions. Column 3 is the INFORMATION flag. An alphanumeric other than a period (.) in the THIRD column provides additional information about the collection or analysis of the sample. A P in the 3rd column of the QC flag indicates the measurement result is preliminary and has not yet been carefully examined by the PI. The P flag is removed once the quality of the measurement has been determined. # # VARIABLE ORDER # site_code year month day hour minute second datetime time_decimal air_sample_container_id value value_unc latitude longitude altitude elevation intake_height method event_number instrument analysis_datetime qcflag ZEP 1994 2 11 14 30 0 1994-02-11T14:30:00Z 1994.1139840182648 315-91 1830.39 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166215 C7 1994-03-23T15:30:00 ... ZEP 1994 2 11 14 30 0 1994-02-11T14:30:00Z 1994.1139840182648 316-91 1833.65 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166216 C7 1994-03-23T15:46:00 ... ZEP 1994 2 14 14 30 0 1994-02-14T14:30:00Z 1994.122203196347 179-91 1843.65 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166217 C7 1994-03-23T08:39:00 ... ZEP 1994 2 14 14 30 0 1994-02-14T14:30:00Z 1994.122203196347 180-91 1843.13 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166218 C7 1994-03-23T08:55:00 ... ZEP 1994 2 17 9 45 0 1994-02-17T09:45:00Z 1994.1298801369862 503-91 1841.79 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166219 C7 1994-03-23T13:15:00 ... ZEP 1994 2 17 9 45 0 1994-02-17T09:45:00Z 1994.1298801369862 504-91 1842.12 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166220 C7 1994-03-23T13:31:00 ... ZEP 1994 2 19 14 0 0 1994-02-19T14:00:00Z 1994.1358447488585 501-91 1828.95 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166221 C7 1994-03-23T12:42:00 ... ZEP 1994 2 19 14 0 0 1994-02-19T14:00:00Z 1994.1358447488585 502-91 1832.34 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166222 C7 1994-03-23T12:58:00 ... ZEP 1994 2 21 14 0 0 1994-02-21T14:00:00Z 1994.1413242009132 245-91 1834.58 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166223 C7 1994-03-23T13:47:00 ... ZEP 1994 2 21 14 0 0 1994-02-21T14:00:00Z 1994.1413242009132 246-91 1836.81 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166224 C7 1994-03-23T14:04:00 ... ZEP 1994 2 22 15 0 0 1994-02-22T15:00:00Z 1994.1441780821917 333-91 1847.96 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166225 C7 1994-03-23T14:20:00 ... ZEP 1994 2 22 15 0 0 1994-02-22T15:00:00Z 1994.1441780821917 334-91 1849.9 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166226 C7 1994-03-23T14:36:00 ... ZEP 1994 2 23 8 0 0 1994-02-23T08:00:00Z 1994.146118721461 441-91 1872.07 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166227 C7 1994-03-24T09:12:00 ... ZEP 1994 2 23 8 0 0 1994-02-23T08:00:00Z 1994.146118721461 442-91 1877.44 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166228 C7 1994-03-24T09:28:00 ... ZEP 1994 2 23 17 15 0 1994-02-23T17:15:00Z 1994.1471746575342 203-91 1850.82 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166229 C7 1994-03-24T12:33:00 ... ZEP 1994 2 23 17 15 0 1994-02-23T17:15:00Z 1994.1471746575342 204-91 1853.81 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166230 C7 1994-03-24T12:50:00 ... ZEP 1994 4 22 8 55 0 1994-04-22T08:55:00Z 1994.3051274733639 82-91 1834.42 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166231 C7 1994-06-16T11:02:00 ... ZEP 1994 4 28 7 40 0 1994-04-28T07:40:00Z 1994.3214231354643 357-91 1844.87 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166232 C7 1994-06-16T12:01:00 ... ZEP 1994 4 28 7 40 0 1994-04-28T07:40:00Z 1994.3214231354643 358-91 1848.34 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166233 C7 1994-06-16T12:18:00 ... ZEP 1994 5 5 12 34 56 1994-05-05T12:34:56Z 1994.341162354135 254-91 1837.54 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166234 C7 1994-06-08T16:49:00 ... ZEP 1994 5 12 12 34 56 1994-05-12T12:34:56Z 1994.3603404363269 57-91 1825.36 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166235 C7 1994-06-08T14:28:00 ... ZEP 1994 5 12 12 34 56 1994-05-12T12:34:56Z 1994.3603404363269 58-91 1825.04 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166236 C7 1994-06-08T14:45:00 ... ZEP 1994 5 16 12 45 0 1994-05-16T12:45:00Z 1994.3713184931507 537-91 1826.46 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166237 C7 1994-06-08T11:04:00 ... ZEP 1994 5 16 12 45 0 1994-05-16T12:45:00Z 1994.3713184931507 538-91 1824.86 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166238 C7 1994-06-08T11:20:00 ... ZEP 1994 5 18 7 30 0 1994-05-18T07:30:00Z 1994.376198630137 243-91 1814.67 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166239 C7 1994-06-08T08:48:00 ... ZEP 1994 5 18 7 30 0 1994-05-18T07:30:00Z 1994.376198630137 244-91 1821.33 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166240 C7 1994-06-08T09:04:00 ... ZEP 1994 5 21 7 45 0 1994-05-21T07:45:00Z 1994.384446347032 151-91 1821.54 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166241 C7 1994-06-08T09:20:00 ... ZEP 1994 5 21 7 45 0 1994-05-21T07:45:00Z 1994.384446347032 152-91 1824.17 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166242 C7 1994-06-08T09:37:00 ... ZEP 1994 5 23 7 30 0 1994-05-23T07:30:00Z 1994.389897260274 27-91 1817.84 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166243 C7 1994-06-08T11:37:00 ... ZEP 1994 5 23 7 30 0 1994-05-23T07:30:00Z 1994.389897260274 28-91 1812.73 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166244 C7 1994-06-08T11:53:00 ... ZEP 1994 5 26 16 15 0 1994-05-26T16:15:00Z 1994.3991152968038 747-91 1820.95 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166245 C7 1994-06-16T09:03:00 ... ZEP 1994 5 26 16 15 0 1994-05-26T16:15:00Z 1994.3991152968038 748-91 1819.64 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166246 C7 1994-06-16T09:20:00 ... ZEP 1994 5 28 7 25 0 1994-05-28T07:25:00Z 1994.4035863774734 745-91 1821.77 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166247 C7 1994-06-16T10:46:00 ... ZEP 1994 5 29 9 30 0 1994-05-29T09:30:00Z 1994.4065639269406 741-91 1817.59 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166248 C7 1994-06-20T15:41:00 ... ZEP 1994 5 29 9 30 0 1994-05-29T09:30:00Z 1994.4065639269406 742-91 1814.12 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166249 C7 1994-06-20T15:58:00 ... ZEP 1994 5 31 8 0 0 1994-05-31T08:00:00Z 1994.4118721461186 743-91 1813.34 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166250 C7 1994-06-20T14:37:00 ... ZEP 1994 5 31 8 0 0 1994-05-31T08:00:00Z 1994.4118721461186 744-91 1812.54 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166251 C7 1994-06-20T14:53:00 ... ZEP 1994 6 2 7 20 0 1994-06-02T07:20:00Z 1994.4172754946728 737-91 1816.35 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166252 C7 1994-06-29T09:03:00 ... ZEP 1994 6 2 7 20 0 1994-06-02T07:20:00Z 1994.4172754946728 738-91 1818.24 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166253 C7 1994-06-29T09:19:00 ... ZEP 1994 6 5 16 10 0 1994-06-05T16:10:00Z 1994.42650304414 739-91 1815.96 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166254 C7 1994-06-29T08:31:00 ... ZEP 1994 6 5 16 10 0 1994-06-05T16:10:00Z 1994.42650304414 740-91 1812.26 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166255 C7 1994-06-29T08:47:00 ... ZEP 1994 6 7 10 9 0 1994-06-07T10:09:00Z 1994.4312956621004 733-91 1804.99 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166256 C7 1994-06-28T13:55:00 ... ZEP 1994 6 7 10 9 0 1994-06-07T10:09:00Z 1994.4312956621004 734-91 1810.8 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166257 C7 1994-06-28T14:11:00 ... ZEP 1994 6 9 9 38 0 1994-06-09T09:38:00Z 1994.4367161339421 736-91 1811.17 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166259 C7 1994-06-28T14:28:00 ... ZEP 1994 6 13 8 40 0 1994-06-13T08:40:00Z 1994.4475646879757 800-91 1808.58 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166260 C7 1994-07-01T09:02:00 ... ZEP 1994 6 14 8 40 0 1994-06-14T08:40:00Z 1994.450304414003 803-91 1807.66 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166261 C7 1994-07-01T09:35:00 ... ZEP 1994 6 14 8 40 0 1994-06-14T08:40:00Z 1994.450304414003 804-91 1806.9 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166262 C7 1994-07-01T09:51:00 ... ZEP 1994 6 15 8 8 0 1994-06-15T08:08:00Z 1994.4529832572298 795-91 1810.17 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166263 C7 1994-07-01T10:07:00 ... ZEP 1994 6 15 8 8 0 1994-06-15T08:08:00Z 1994.4529832572298 796-91 1807.77 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166264 C7 1994-07-01T10:23:00 ... ZEP 1994 6 17 8 15 0 1994-06-17T08:15:00Z 1994.4584760273972 793-91 1809.33 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166265 C7 1994-07-01T08:29:00 ... ZEP 1994 6 17 8 15 0 1994-06-17T08:15:00Z 1994.4584760273972 794-91 1811.09 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166266 C7 1994-07-01T08:45:00 ... ZEP 1994 6 20 8 25 0 1994-06-20T08:25:00Z 1994.4667142313547 791-91 1811.01 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166267 C7 1994-07-08T12:49:00 ... ZEP 1994 6 20 8 25 0 1994-06-20T08:25:00Z 1994.4667142313547 792-91 1815.59 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166268 C7 1994-07-08T13:06:00 ... ZEP 1994 6 23 7 25 0 1994-06-23T07:25:00Z 1994.4748192541856 197-91 1811.73 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166269 C7 1994-07-08T11:44:00 ... ZEP 1994 6 23 7 25 0 1994-06-23T07:25:00Z 1994.4748192541856 198-91 1810.79 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166270 C7 1994-07-08T12:00:00 ... ZEP 1994 6 30 7 6 0 1994-06-30T07:06:00Z 1994.4939611872146 213-91 1835.67 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166271 C7 1994-07-08T11:11:00 ... ZEP 1994 6 30 7 6 0 1994-06-30T07:06:00Z 1994.4939611872146 214-91 1831.38 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166272 C7 1994-07-08T11:28:00 ... ZEP 1994 7 1 8 30 0 1994-07-01T08:30:00Z 1994.4968607305937 789-91 1824.3 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166273 C7 1994-07-08T12:17:00 ... ZEP 1994 7 1 8 30 0 1994-07-01T08:30:00Z 1994.4968607305937 790-91 1824.73 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166274 C7 1994-07-08T12:33:00 ... ZEP 1994 7 4 9 24 0 1994-07-04T09:24:00Z 1994.5051826484018 801-91 1809.53 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166275 C7 1994-07-18T13:49:00 ... ZEP 1994 7 4 9 24 0 1994-07-04T09:24:00Z 1994.5051826484018 802-91 1809.45 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166276 C7 1994-07-18T14:05:00 ... ZEP 1994 7 6 8 43 0 1994-07-06T08:43:00Z 1994.5105840943684 797-91 1806.19 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166277 C7 1994-07-20T10:00:00 ... ZEP 1994 7 6 8 43 0 1994-07-06T08:43:00Z 1994.5105840943684 798-91 1806.86 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166278 C7 1994-07-20T10:16:00 ... ZEP 1994 7 8 8 48 0 1994-07-08T08:48:00Z 1994.5160730593607 787-91 1811.34 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166279 C7 1994-07-26T13:48:00 ... ZEP 1994 7 8 8 48 0 1994-07-08T08:48:00Z 1994.5160730593607 788-91 1811.89 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166280 C7 1994-07-26T14:04:00 ... ZEP 1994 7 11 9 35 0 1994-07-11T09:35:00Z 1994.5243816590564 785-91 1803.54 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166281 C7 1994-07-26T14:20:00 ... ZEP 1994 7 11 9 35 0 1994-07-11T09:35:00Z 1994.5243816590564 786-91 1805.38 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166282 C7 1994-07-26T14:36:00 ... ZEP 1994 7 13 7 35 0 1994-07-13T07:35:00Z 1994.5296328006089 781-91 1803.16 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166283 C7 1994-07-27T16:21:00 ... ZEP 1994 7 13 7 35 0 1994-07-13T07:35:00Z 1994.5296328006089 782-91 1804.41 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166284 C7 1994-07-27T16:38:00 ... ZEP 1994 7 15 8 2 0 1994-07-15T08:02:00Z 1994.5351636225266 783-91 1806.65 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166285 C7 1994-07-27T15:49:00 ... ZEP 1994 7 15 8 2 0 1994-07-15T08:02:00Z 1994.5351636225266 784-91 1808.38 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166286 C7 1994-07-27T16:05:00 ... ZEP 1994 7 18 8 22 0 1994-07-18T08:22:00Z 1994.5434208523593 813-91 1798.35 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166287 C7 1994-08-15T09:27:00 ... ZEP 1994 7 18 8 22 0 1994-07-18T08:22:00Z 1994.5434208523593 814-91 1798.1 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166288 C7 1994-08-15T09:44:00 ... ZEP 1994 7 20 8 25 0 1994-07-20T08:25:00Z 1994.5489060121765 815-91 1802.1 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166289 C7 1994-08-15T12:48:00 ... ZEP 1994 7 20 8 25 0 1994-07-20T08:25:00Z 1994.5489060121765 816-91 1803.14 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166290 C7 1994-08-15T13:04:00 ... ZEP 1994 7 22 12 34 56 1994-07-22T12:34:56Z 1994.554860984272 811-91 1799.24 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166291 C7 1994-08-15T11:11:00 ... ZEP 1994 7 27 8 48 0 1994-07-27T08:48:00Z 1994.5681278538814 807-91 1795.64 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166292 C7 1994-08-15T10:00:00 ... ZEP 1994 7 27 8 48 0 1994-07-27T08:48:00Z 1994.5681278538814 808-91 1796.24 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166293 C7 1994-08-15T10:16:00 ... ZEP 1994 7 29 8 50 0 1994-07-29T08:50:00Z 1994.5736111111112 810-91 1797.38 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166294 C7 1994-08-16T16:22:00 ... ZEP 1994 8 1 9 32 0 1994-08-01T09:32:00Z 1994.581910197869 805-91 1803.88 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166295 C7 1994-08-16T13:36:00 ... ZEP 1994 8 1 9 32 0 1994-08-01T09:32:00Z 1994.581910197869 806-91 1805.72 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166296 C7 1994-08-16T13:52:00 ... ZEP 1994 8 8 8 30 0 1994-08-08T08:30:00Z 1994.6009703196346 121-91 1802.18 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166297 C7 1994-08-23T15:07:00 ... ZEP 1994 8 8 8 30 0 1994-08-08T08:30:00Z 1994.6009703196346 122-91 1800.49 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166298 C7 1994-08-23T15:24:00 ... ZEP 1994 8 10 8 55 0 1994-08-10T08:55:00Z 1994.6064973363775 385-91 1798.36 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166299 C7 1994-08-24T08:56:00 ... ZEP 1994 8 10 8 55 0 1994-08-10T08:55:00Z 1994.6064973363775 386-91 1799.92 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166300 C7 1994-08-24T09:13:00 ... ZEP 1994 8 18 9 0 0 1994-08-18T09:00:00Z 1994.6284246575342 355-91 1794.74 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166301 C7 1994-09-07T09:09:00 ... ZEP 1994 8 18 9 0 0 1994-08-18T09:00:00Z 1994.6284246575342 356-91 1798.98 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166302 C7 1994-09-07T09:25:00 ... ZEP 1994 8 25 8 15 0 1994-08-25T08:15:00Z 1994.6475171232876 539-91 1796.78 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166303 C7 1994-09-07T08:02:00 ... ZEP 1994 8 25 8 15 0 1994-08-25T08:15:00Z 1994.6475171232876 540-91 1796.93 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166304 C7 1994-09-07T08:18:00 ... ZEP 1994 8 31 13 38 0 1994-08-31T13:38:00Z 1994.6645700152208 353-91 1802.62 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166305 C7 1994-09-27T10:09:00 ... ZEP 1994 8 31 13 38 0 1994-08-31T13:38:00Z 1994.6645700152208 354-91 1804.41 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166306 C7 1994-09-27T10:26:00 ... ZEP 1994 9 8 7 55 0 1994-09-08T07:55:00Z 1994.6858352359209 217-91 1808.38 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166307 C7 1994-10-18T12:50:00 ... ZEP 1994 9 15 8 30 0 1994-09-15T08:30:00Z 1994.7050799086758 199-91 1823.86 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166308 C7 1994-10-18T13:55:00 ... ZEP 1994 9 15 8 30 0 1994-09-15T08:30:00Z 1994.7050799086758 200-91 1824.32 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166309 C7 1994-10-18T14:11:00 ... ZEP 1994 9 22 8 0 0 1994-09-22T08:00:00Z 1994.724200913242 717-91 1811.94 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166310 C7 1994-10-25T17:47:00 ... ZEP 1994 9 22 8 0 0 1994-09-22T08:00:00Z 1994.724200913242 718-91 1809.91 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166311 C7 1994-10-25T18:03:00 ... ZEP 1994 9 29 8 20 0 1994-09-29T08:20:00Z 1994.7434170471843 715-91 1829.11 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166312 C7 1994-10-25T17:15:00 ... ZEP 1994 9 29 8 20 0 1994-09-29T08:20:00Z 1994.7434170471843 716-91 1830.6 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166313 C7 1994-10-25T17:31:00 ... ZEP 1994 10 6 8 14 0 1994-10-06T08:14:00Z 1994.7625837138507 273-91 1837.25 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166314 C7 1994-11-04T13:56:00 ... ZEP 1994 10 6 8 14 0 1994-10-06T08:14:00Z 1994.7625837138507 274-91 1840.11 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166315 C7 1994-11-04T14:12:00 ... ZEP 1994 10 13 8 42 0 1994-10-13T08:42:00Z 1994.7818150684932 323-91 1843.56 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166316 C7 1994-11-04T13:23:00 ... ZEP 1994 10 13 8 42 0 1994-10-13T08:42:00Z 1994.7818150684932 324-91 1844.82 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166317 C7 1994-11-04T13:39:00 ... ZEP 1994 10 20 8 20 0 1994-10-20T08:20:00Z 1994.8009512937595 669-91 1832.45 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166318 C7 1995-01-05T15:48:00 ... ZEP 1994 10 20 8 20 0 1994-10-20T08:20:00Z 1994.8009512937595 670-91 1831.46 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166319 C7 1995-01-05T16:04:00 ... ZEP 1994 10 27 10 10 0 1994-10-27T10:10:00Z 1994.8203386605785 305-91 1834.33 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166320 C7 1995-01-05T14:09:00 ... ZEP 1994 10 27 10 10 0 1994-10-27T10:10:00Z 1994.8203386605785 306-91 1841.59 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166321 C7 1995-01-05T14:25:00 ... ZEP 1994 11 3 10 25 0 1994-11-03T10:25:00Z 1994.839545281583 83-91 1839.65 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166322 C7 1995-01-05T13:29:00 ... ZEP 1994 11 3 10 25 0 1994-11-03T10:25:00Z 1994.839545281583 84-91 1841.05 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166323 C7 1995-01-05T13:45:00 ... ZEP 1994 11 10 8 20 0 1994-11-10T08:20:00Z 1994.8584855403349 69-91 1824.52 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166324 C7 1995-01-05T12:24:00 ... ZEP 1994 11 10 8 20 0 1994-11-10T08:20:00Z 1994.8584855403349 70-91 1824.99 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166325 C7 1995-01-05T12:40:00 ... ZEP 1994 11 17 8 58 0 1994-11-17T08:58:00Z 1994.8777359208523 109-91 1828.85 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166326 C7 1995-02-07T10:47:00 ... ZEP 1994 11 17 8 58 0 1994-11-17T08:58:00Z 1994.8777359208523 110-91 1828.09 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166327 C7 1995-02-07T11:04:00 ... ZEP 1994 11 24 8 40 0 1994-11-24T08:40:00Z 1994.8968797564687 119-91 1868.49 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166328 C7 1995-02-07T09:43:00 C.. ZEP 1994 11 24 8 40 0 1994-11-24T08:40:00Z 1994.8968797564687 120-91 1841.12 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166329 C7 1995-02-07T09:59:00 C.. ZEP 1994 12 1 23 5 0 1994-12-01T23:05:00Z 1994.9177035768646 27-91 1846.62 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166331 C7 1995-02-13T12:25:00 ... ZEP 1994 12 1 23 5 0 1994-12-01T23:05:00Z 1994.9177035768646 28-91 1848.41 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166332 C7 1995-02-13T12:41:00 ... ZEP 1994 12 10 10 13 0 1994-12-10T10:13:00Z 1994.9408923135463 229-91 1842.91 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166333 C7 1995-02-07T11:20:00 ... ZEP 1994 12 10 10 13 0 1994-12-10T10:13:00Z 1994.9408923135463 230-91 1846.94 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166334 C7 1995-02-07T11:36:00 ... ZEP 1994 12 15 8 37 0 1994-12-15T08:37:00Z 1994.9544082952816 441-91 1832.85 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166335 C7 1995-02-07T14:50:00 ... ZEP 1994 12 15 8 37 0 1994-12-15T08:37:00Z 1994.9544082952816 442-91 1832.21 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166336 C7 1995-02-07T15:06:00 ... ZEP 1994 12 22 14 43 0 1994-12-22T14:43:00Z 1994.9742827245054 145-91 1854.13 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166337 C7 1995-03-16T07:27:00 ... ZEP 1994 12 22 14 43 0 1994-12-22T14:43:00Z 1994.9742827245054 146-91 1853.95 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166338 C7 1995-03-16T07:43:00 ... ZEP 1994 12 29 10 5 0 1994-12-29T10:05:00Z 1994.992931887367 295-91 1850.45 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166339 C7 1995-03-15T12:43:00 ... ZEP 1994 12 29 10 5 0 1994-12-29T10:05:00Z 1994.992931887367 296-91 1851.94 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166340 C7 1995-03-15T12:59:00 ... ZEP 1995 1 5 8 45 0 1995-01-05T08:45:00Z 1995.0119577625571 1-91 1845.5 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166341 C7 1995-03-20T10:08:00 ... ZEP 1995 1 5 8 45 0 1995-01-05T08:45:00Z 1995.0119577625571 2-91 1846.69 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166342 C7 1995-03-20T10:24:00 ... ZEP 1995 1 12 9 20 0 1995-01-12T09:20:00Z 1995.031202435312 549-91 1826.62 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166343 C7 1995-03-20T08:36:00 ... ZEP 1995 1 12 9 20 0 1995-01-12T09:20:00Z 1995.031202435312 550-91 1827.64 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166344 C7 1995-03-20T08:52:00 ... ZEP 1995 1 20 9 4 0 1995-01-20T09:04:00Z 1995.053089802131 139-91 1840.11 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166345 C7 1995-03-17T12:51:00 ... ZEP 1995 1 26 8 53 0 1995-01-26T08:53:00Z 1995.0695072298327 717-91 1855.14 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166346 C7 1995-03-20T08:03:00 ... ZEP 1995 1 26 8 53 0 1995-01-26T08:53:00Z 1995.0695072298327 718-91 1851.36 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166347 C7 1995-03-20T08:19:00 ... ZEP 1995 2 2 9 30 0 1995-02-02T09:30:00Z 1995.0887557077626 739-91 1860.95 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166348 C7 1995-03-16T09:05:00 ... ZEP 1995 2 2 9 30 0 1995-02-02T09:30:00Z 1995.0887557077626 740-91 1863.6 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166349 C7 1995-03-16T09:21:00 ... ZEP 1995 2 9 9 18 0 1995-02-09T09:18:00Z 1995.107910958904 733-91 1845.13 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166350 C7 1995-03-16T08:32:00 ... ZEP 1995 2 9 9 18 0 1995-02-09T09:18:00Z 1995.107910958904 734-91 1846.71 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166351 C7 1995-03-16T08:48:00 ... ZEP 1995 2 16 8 50 0 1995-02-16T08:50:00Z 1995.1270357686453 747-91 1845.87 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166352 C7 1995-05-02T15:46:00 ... ZEP 1995 2 16 8 50 0 1995-02-16T08:50:00Z 1995.1270357686453 748-91 1849.47 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166353 C7 1995-05-02T16:02:00 ... ZEP 1995 2 23 9 5 0 1995-02-23T09:05:00Z 1995.1462423896498 809-91 1887.31 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166354 C7 1995-05-02T13:13:00 ... ZEP 1995 2 23 9 5 0 1995-02-23T09:05:00Z 1995.1462423896498 810-91 1890.18 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166355 C7 1995-05-02T13:29:00 ... ZEP 1995 3 2 9 25 0 1995-03-02T09:25:00Z 1995.1654585235922 815-91 1888.16 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166356 C7 1995-05-02T12:40:00 ... ZEP 1995 3 2 9 25 0 1995-03-02T09:25:00Z 1995.1654585235922 816-91 1885.64 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166357 C7 1995-05-02T12:57:00 ... ZEP 1995 3 9 9 21 0 1995-03-09T09:21:00Z 1995.1846289954337 787-91 1844.06 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166358 C7 1995-05-02T13:45:00 ... ZEP 1995 3 16 9 55 0 1995-03-16T09:55:00Z 1995.2038717656012 177-91 1864.62 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166359 C7 1995-06-01T10:10:00 ... ZEP 1995 3 16 9 55 0 1995-03-16T09:55:00Z 1995.2038717656012 178-91 1863.43 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166360 C7 1995-06-01T10:26:00 ... ZEP 1995 3 23 10 30 0 1995-03-23T10:30:00Z 1995.223116438356 593-91 1848.42 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166361 C7 1995-06-01T08:28:00 ... ZEP 1995 3 23 10 30 0 1995-03-23T10:30:00Z 1995.223116438356 594-91 1851.39 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166362 C7 1995-06-01T08:44:00 ... ZEP 1995 3 31 8 25 0 1995-03-31T08:25:00Z 1995.2447964231355 345-91 1868.78 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166363 C7 1995-05-31T15:09:00 ... ZEP 1995 3 31 8 25 0 1995-03-31T08:25:00Z 1995.2447964231355 346-91 1865.76 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166364 C7 1995-05-31T15:26:00 ... ZEP 1995 4 6 7 56 0 1995-04-06T07:56:00Z 1995.2611796042618 511-91 1849.34 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166365 C7 1995-05-31T14:37:00 ... ZEP 1995 4 6 7 56 0 1995-04-06T07:56:00Z 1995.2611796042618 512-91 1847.17 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166366 C7 1995-05-31T14:53:00 ... ZEP 1995 4 13 8 35 0 1995-04-13T08:35:00Z 1995.2804318873668 59-91 1847.02 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166367 C7 1995-07-12T12:16:00 ... ZEP 1995 4 13 8 35 0 1995-04-13T08:35:00Z 1995.2804318873668 60-91 1845.09 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166368 C7 1995-07-12T12:32:00 ... ZEP 1995 4 20 8 6 0 1995-04-20T08:06:00Z 1995.2995547945206 643-91 1834.26 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166369 C7 1995-07-12T11:15:00 ..M ZEP 1995 4 20 8 6 0 1995-04-20T08:06:00Z 1995.2995547945206 644-91 1833.61 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166370 C7 1995-07-12T12:00:00 ... ZEP 1995 4 27 8 30 0 1995-04-27T08:30:00Z 1995.3187785388127 537-91 1832.26 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166371 C7 1995-07-13T11:02:00 ... ZEP 1995 4 27 8 30 0 1995-04-27T08:30:00Z 1995.3187785388127 538-91 1836.3 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166372 C7 1995-07-13T11:19:00 ... ZEP 1995 5 4 8 17 0 1995-05-04T08:17:00Z 1995.3379318873667 1173-91 1825.74 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166373 C7 1995-07-12T16:15:00 ... ZEP 1995 5 4 8 17 0 1995-05-04T08:17:00Z 1995.3379318873667 1174-91 1822.45 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166374 C7 1995-07-12T16:31:00 ... ZEP 1995 5 11 8 10 0 1995-05-11T08:10:00Z 1995.357096651446 157-91 1823.77 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166375 C7 1995-08-21T17:32:00 ... ZEP 1995 5 11 8 10 0 1995-05-11T08:10:00Z 1995.357096651446 158-91 1820.03 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166376 C7 1995-08-21T17:48:00 ... ZEP 1995 5 18 7 35 0 1995-05-18T07:35:00Z 1995.3762081430746 859-91 1833.75 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166377 C7 1995-08-21T18:04:00 ... ZEP 1995 5 18 7 35 0 1995-05-18T07:35:00Z 1995.3762081430746 860-91 1837.17 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166378 C7 1995-08-21T18:20:00 ... ZEP 1995 5 25 7 50 0 1995-05-25T07:50:00Z 1995.395414764079 661-91 1825.76 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166379 C7 1995-08-18T14:55:00 ... ZEP 1995 5 25 7 50 0 1995-05-25T07:50:00Z 1995.395414764079 662-91 1824.43 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166380 C7 1995-08-18T15:11:00 ... ZEP 1995 6 2 14 10 0 1995-06-02T14:10:00Z 1995.4180555555556 669-91 1816.52 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166381 C7 1995-08-21T10:31:00 ... ZEP 1995 6 2 14 10 0 1995-06-02T14:10:00Z 1995.4180555555556 670-91 1816.36 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166382 C7 1995-08-21T10:47:00 ... ZEP 1995 6 9 8 20 0 1995-06-09T08:20:00Z 1995.4365677321157 167-91 1817.96 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166383 C7 1995-07-17T12:43:00 ... ZEP 1995 6 9 8 20 0 1995-06-09T08:20:00Z 1995.4365677321157 168-91 1816.02 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166384 C7 1995-07-17T12:59:00 ... ZEP 1995 6 9 8 30 0 1995-06-09T08:30:00Z 1995.4365867579909 801-91 1818.63 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166385 C7 1995-08-21T09:59:00 ... ZEP 1995 6 9 8 30 0 1995-06-09T08:30:00Z 1995.4365867579909 802-91 1819.9 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166386 C7 1995-08-21T10:15:00 ... ZEP 1995 6 11 8 0 0 1995-06-11T08:00:00Z 1995.44200913242 100-91 1803.5 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166388 C7 1995-07-14T14:59:00 ... ZEP 1995 6 11 8 0 0 1995-06-11T08:00:00Z 1995.44200913242 99-91 1813.62 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166387 C7 1995-07-14T14:43:00 ... ZEP 1995 6 13 7 33 0 1995-06-13T07:33:00Z 1995.447437214612 793-91 1811.9 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166389 C7 1995-08-21T08:53:00 ... ZEP 1995 6 13 7 33 0 1995-06-13T07:33:00Z 1995.447437214612 794-91 1809.88 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166390 C7 1995-08-21T09:09:00 ... ZEP 1995 6 14 17 58 0 1995-06-14T17:58:00Z 1995.4513660578386 813-91 1808.51 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166391 C7 1995-07-14T12:44:00 ... ZEP 1995 6 14 17 58 0 1995-06-14T17:58:00Z 1995.4513660578386 814-91 1813.18 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166392 C7 1995-07-14T13:01:00 ... ZEP 1995 6 15 12 57 0 1995-06-15T12:57:00Z 1995.4535331050229 25-91 1809.33 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166393 C7 1995-08-21T12:20:00 ... ZEP 1995 6 15 12 57 0 1995-06-15T12:57:00Z 1995.4535331050229 26-91 1806.04 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166394 C7 1995-08-21T12:36:00 ... ZEP 1995 6 16 18 12 0 1995-06-16T18:12:00Z 1995.4568721461187 811-91 1807.96 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166395 C7 1995-07-14T14:06:00 ... ZEP 1995 6 16 18 12 0 1995-06-16T18:12:00Z 1995.4568721461187 812-91 1812.63 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166396 C7 1995-07-14T14:23:00 ... ZEP 1995 6 17 14 5 0 1995-06-17T14:05:00Z 1995.4591419330288 741-91 1810.59 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166397 C7 1995-08-22T09:38:00 ... ZEP 1995 6 17 14 5 0 1995-06-17T14:05:00Z 1995.4591419330288 742-91 1811.29 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166398 C7 1995-08-22T09:55:00 ... ZEP 1995 6 18 13 10 0 1995-06-18T13:10:00Z 1995.4617770167429 791-91 1808.91 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166399 C7 1995-08-22T10:48:00 ... ZEP 1995 6 18 13 10 0 1995-06-18T13:10:00Z 1995.4617770167429 792-91 1808.06 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166400 C7 1995-08-22T11:04:00 ... ZEP 1995 6 19 13 50 0 1995-06-19T13:50:00Z 1995.464592846271 735-91 1802.49 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166401 C7 1995-07-14T13:34:00 ... ZEP 1995 6 19 13 50 0 1995-06-19T13:50:00Z 1995.464592846271 736-91 1799.82 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166402 C7 1995-07-14T13:50:00 ... ZEP 1995 6 20 13 50 0 1995-06-20T13:50:00Z 1995.4673325722983 797-91 1805.54 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166403 C7 1995-07-14T13:17:00 ... ZEP 1995 6 22 7 25 0 1995-06-22T07:25:00Z 1995.4720795281582 1175-91 1807.1 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166405 C7 1995-08-21T11:15:00 ... ZEP 1995 6 22 7 25 0 1995-06-22T07:25:00Z 1995.4720795281582 1176-91 1806.51 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166406 C7 1995-08-21T11:31:00 ... ZEP 1995 6 22 17 10 0 1995-06-22T17:10:00Z 1995.4731925418569 33-91 1811.29 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166407 C7 1995-07-17T13:48:00 ... ZEP 1995 6 22 17 10 0 1995-06-22T17:10:00Z 1995.4731925418569 34-91 1807.26 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166408 C7 1995-07-17T14:05:00 ... ZEP 1995 6 23 7 50 0 1995-06-23T07:50:00Z 1995.4748668188736 87-91 1805.36 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166409 C7 1995-07-17T13:16:00 ... ZEP 1995 6 23 7 50 0 1995-06-23T07:50:00Z 1995.4748668188736 88-91 1803.25 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166410 C7 1995-07-17T13:32:00 ... ZEP 1995 6 23 12 50 0 1995-06-23T12:50:00Z 1995.4754375951293 733-91 1807.17 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166411 C7 1995-08-21T12:52:00 ... ZEP 1995 6 23 12 50 0 1995-06-23T12:50:00Z 1995.4754375951293 734-91 1810.75 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166412 C7 1995-08-21T13:09:00 ... ZEP 1995 6 23 14 35 0 1995-06-23T14:35:00Z 1995.4756373668188 739-91 1805.03 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166413 C7 1995-08-21T09:25:00 ... ZEP 1995 6 23 14 35 0 1995-06-23T14:35:00Z 1995.4756373668188 740-91 1809.03 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166414 C7 1995-08-21T09:42:00 C.. ZEP 1995 6 23 17 10 0 1995-06-23T17:10:00Z 1995.4759322678842 799-91 1805.47 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166415 C7 1995-08-21T14:06:00 ... ZEP 1995 6 24 7 30 0 1995-06-24T07:30:00Z 1995.4775684931508 745-91 1807.28 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166416 C7 1995-08-21T13:34:00 ... ZEP 1995 6 24 7 30 0 1995-06-24T07:30:00Z 1995.4775684931508 746-91 1805.04 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166417 C7 1995-08-21T13:50:00 ... ZEP 1995 6 24 16 55 0 1995-06-24T16:55:00Z 1995.478643455099 815-91 1804.8 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166418 C7 1995-08-22T11:20:00 ... ZEP 1995 6 24 16 55 0 1995-06-24T16:55:00Z 1995.478643455099 816-91 1805.25 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166419 C7 1995-08-22T11:36:00 ... ZEP 1995 6 25 12 0 0 1995-06-25T12:00:00Z 1995.4808219178083 747-91 1803.09 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166420 C7 1995-08-22T12:00:00 ... ZEP 1995 6 25 12 0 0 1995-06-25T12:00:00Z 1995.4808219178083 748-91 1804.74 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166421 C7 1995-08-22T12:16:00 ... ZEP 1995 6 30 7 45 0 1995-06-30T07:45:00Z 1995.494035388128 789-91 1804.32 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166422 C7 1995-08-21T16:59:00 ... ZEP 1995 6 30 7 45 0 1995-06-30T07:45:00Z 1995.494035388128 790-91 1807.2 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166423 C7 1995-08-21T17:15:00 ... ZEP 1995 7 7 7 37 0 1995-07-07T07:37:00Z 1995.5131982496196 737-91 1810.36 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166424 C7 1995-08-21T18:37:00 ... ZEP 1995 7 7 7 37 0 1995-07-07T07:37:00Z 1995.5131982496196 738-91 1808.46 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166425 C7 1995-08-21T18:53:00 ... ZEP 1995 7 14 7 45 0 1995-07-14T07:45:00Z 1995.5323915525114 795-91 1813.4 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166426 C7 1995-09-26T09:40:00 ... ZEP 1995 7 14 7 45 0 1995-07-14T07:45:00Z 1995.5323915525114 796-91 1812.22 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166427 C7 1995-09-26T09:56:00 ... ZEP 1995 7 21 8 50 0 1995-07-21T08:50:00Z 1995.5516933028919 803-91 1807.12 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166428 C7 1995-09-26T10:12:00 ... ZEP 1995 7 21 8 50 0 1995-07-21T08:50:00Z 1995.5516933028919 804-91 1804.4 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166429 C7 1995-09-26T10:28:00 ... ZEP 1995 7 28 9 5 0 1995-07-28T09:05:00Z 1995.5708999238966 807-91 1805.25 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166430 C7 1995-09-26T08:59:00 ... ZEP 1995 7 28 9 5 0 1995-07-28T09:05:00Z 1995.5708999238966 808-91 1806.24 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166431 C7 1995-09-26T09:16:00 ... ZEP 1995 8 3 8 31 0 1995-08-03T08:31:00Z 1995.5872735920852 743-91 1810.88 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166432 C7 1995-09-25T15:02:00 ... ZEP 1995 8 3 8 31 0 1995-08-03T08:31:00Z 1995.5872735920852 744-91 1810.68 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166433 C7 1995-09-25T15:18:00 ... ZEP 1995 8 11 7 50 0 1995-08-11T07:50:00Z 1995.6091133942161 155-91 1808.32 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166434 C7 1995-10-11T09:17:00 ... ZEP 1995 8 11 7 50 0 1995-08-11T07:50:00Z 1995.6091133942161 156-91 1813.04 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166435 C7 1995-10-11T09:33:00 ... ZEP 1995 8 18 9 15 0 1995-08-18T09:15:00Z 1995.628453196347 383-91 1819.56 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166436 C7 1995-10-11T10:31:00 ... ZEP 1995 8 18 9 15 0 1995-08-18T09:15:00Z 1995.628453196347 384-91 1817.53 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166437 C7 1995-10-11T10:48:00 ... ZEP 1995 8 24 7 30 0 1995-08-24T07:30:00Z 1995.6446917808219 277-91 1822.92 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166438 C7 1995-10-11T08:45:00 ... ZEP 1995 8 24 7 30 0 1995-08-24T07:30:00Z 1995.6446917808219 278-91 1820.8 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166439 C7 1995-10-11T09:01:00 ... ZEP 1995 9 1 9 35 0 1995-09-01T09:35:00Z 1995.666847412481 15-91 1824.46 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166440 C7 1995-10-11T08:12:00 ... ZEP 1995 9 1 9 35 0 1995-09-01T09:35:00Z 1995.666847412481 16-91 1823.38 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166441 C7 1995-10-11T08:28:00 ... ZEP 1995 9 8 8 45 0 1995-09-08T08:45:00Z 1995.6859303652968 649-91 1817.62 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166442 C7 1995-11-15T15:02:00 ... ZEP 1995 9 8 8 45 0 1995-09-08T08:45:00Z 1995.6859303652968 650-91 1814.39 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166443 C7 1995-11-15T15:18:00 ... ZEP 1995 9 14 8 55 0 1995-09-14T08:55:00Z 1995.7023877473364 623-91 1822.87 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166444 C7 1995-11-15T16:08:00 ... ZEP 1995 9 14 8 55 0 1995-09-14T08:55:00Z 1995.7023877473364 624-91 1822.26 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166445 C7 1995-11-15T16:24:00 ... ZEP 1995 9 22 9 30 0 1995-09-22T09:30:00Z 1995.7243721461186 179-91 1824.03 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166446 C7 1995-11-15T11:58:00 ... ZEP 1995 9 22 9 30 0 1995-09-22T09:30:00Z 1995.7243721461186 180-91 1824.07 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166447 C7 1995-11-15T12:14:00 ... ZEP 1995 9 28 9 35 0 1995-09-28T09:35:00Z 1995.7408200152206 203-91 1849.92 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166448 C7 1995-11-15T12:31:00 ... ZEP 1995 9 28 9 35 0 1995-09-28T09:35:00Z 1995.7408200152206 204-91 1850.95 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166449 C7 1995-11-15T12:47:00 ... ZEP 1995 10 5 7 40 0 1995-10-05T07:40:00Z 1995.7597792998479 1303-91 1857.25 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166450 C7 1996-01-09T14:42:00 ... ZEP 1995 10 5 7 40 0 1995-10-05T07:40:00Z 1995.7597792998479 1304-91 1862.11 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166451 C7 1996-01-09T14:58:00 ... ZEP 1995 10 13 10 40 0 1995-10-13T10:40:00Z 1995.7820395738204 1327-91 1833.95 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166452 C7 1996-01-09T14:09:00 ... ZEP 1995 10 13 10 40 0 1995-10-13T10:40:00Z 1995.7820395738204 1328-91 1838.68 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166453 C7 1996-01-09T14:25:00 ... ZEP 1995 10 19 9 0 0 1995-10-19T09:00:00Z 1995.7982876712329 41-91 1832.25 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166454 C7 1996-01-05T08:59:00 ... ZEP 1995 10 19 9 0 0 1995-10-19T09:00:00Z 1995.7982876712329 42-91 1832.6 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166455 C7 1996-01-05T09:15:00 ... ZEP 1995 10 26 8 45 0 1995-10-26T08:45:00Z 1995.8174372146118 193-91 1861.49 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166456 C7 1996-01-05T09:32:00 ... ZEP 1995 10 26 8 45 0 1995-10-26T08:45:00Z 1995.8174372146118 194-91 1861.35 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166457 C7 1996-01-05T09:48:00 ... ZEP 1995 11 3 9 22 0 1995-11-03T09:22:00Z 1995.8394254185694 849-91 1853.35 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166458 C7 1996-01-09T13:37:00 ... ZEP 1995 11 3 9 22 0 1995-11-03T09:22:00Z 1995.8394254185694 850-91 1852.37 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166459 C7 1996-01-09T13:53:00 ... ZEP 1995 11 9 8 30 0 1995-11-09T08:30:00Z 1995.8557648401827 1173-91 1849.94 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166460 C7 1996-01-09T13:05:00 ... ZEP 1995 11 9 8 30 0 1995-11-09T08:30:00Z 1995.8557648401827 1174-91 1847.4 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166461 C7 1996-01-09T13:21:00 ... ZEP 1995 11 17 7 42 0 1995-11-17T07:42:00Z 1995.877591324201 625-91 1878.27 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166462 C7 1996-03-06T11:46:00 C.. ZEP 1995 11 17 7 42 0 1995-11-17T07:42:00Z 1995.877591324201 626-91 1876.89 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166463 C7 1996-03-06T12:02:00 C.. ZEP 1995 11 23 8 30 0 1995-11-23T08:30:00Z 1995.8941210045662 4-91 1865.35 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166464 C7 1996-03-08T09:50:00 ... ZEP 1995 11 30 8 50 0 1995-11-30T08:50:00Z 1995.9133371385083 797-91 1853.25 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166465 C7 1996-03-04T16:02:00 ... ZEP 1995 11 30 8 50 0 1995-11-30T08:50:00Z 1995.9133371385083 798-91 1851.65 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166466 C7 1996-03-04T16:19:00 ... ZEP 1995 12 8 8 35 0 1995-12-08T08:35:00Z 1995.9352264079148 813-91 1841.64 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166467 C7 1996-03-04T16:35:00 ... ZEP 1995 12 8 8 35 0 1995-12-08T08:35:00Z 1995.9352264079148 814-91 1839.36 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166468 C7 1996-03-04T16:51:00 ... ZEP 1995 12 14 8 30 0 1995-12-14T08:30:00Z 1995.9516552511416 537-91 1866.08 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166469 C7 1996-03-08T16:27:00 ... ZEP 1995 12 14 8 30 0 1995-12-14T08:30:00Z 1995.9516552511416 538-91 1865.5 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166470 C7 1996-03-08T16:44:00 ... ZEP 1995 12 21 7 40 0 1995-12-21T07:40:00Z 1995.9707382039574 523-91 1886.24 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166471 C7 1996-03-08T14:42:00 ... ZEP 1995 12 21 7 40 0 1995-12-21T07:40:00Z 1995.9707382039574 524-91 1884.66 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166472 C7 1996-03-08T14:58:00 ... ZEP 1995 12 29 8 48 0 1995-12-29T08:48:00Z 1995.992785388128 259-91 1819.37 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166473 C7 1996-03-08T15:55:00 ... ZEP 1995 12 29 8 48 0 1995-12-29T08:48:00Z 1995.992785388128 260-91 1819.11 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166474 C7 1996-03-08T16:11:00 ... ZEP 1996 1 4 10 0 0 1996-01-04T10:00:00Z 1996.0093351548269 837-91 1868.06 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166475 C7 1996-03-08T18:45:00 ... ZEP 1996 1 4 10 0 0 1996-01-04T10:00:00Z 1996.0093351548269 838-91 1867.83 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166476 C7 1996-03-08T19:01:00 ... ZEP 1996 1 12 9 55 0 1996-01-12T09:55:00Z 1996.0311835913783 301-91 1856.2 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166477 C7 1996-03-04T14:57:00 ... ZEP 1996 1 12 9 55 0 1996-01-12T09:55:00Z 1996.0311835913783 302-91 1853.16 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166478 C7 1996-03-04T15:13:00 ... ZEP 1996 1 18 8 50 0 1996-01-18T08:50:00Z 1996.0474537037037 521-91 1827.84 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166479 C7 1996-03-04T15:29:00 ... ZEP 1996 1 18 8 50 0 1996-01-18T08:50:00Z 1996.0474537037037 522-91 1825.27 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166480 C7 1996-03-04T15:46:00 ... ZEP 1996 2 1 10 28 0 1996-02-01T10:28:00Z 1996.0858910139648 1495-91 1853.95 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166481 C7 1996-05-22T12:34:00 ... ZEP 1996 2 1 10 28 0 1996-02-01T10:28:00Z 1996.0858910139648 1496-91 1850.37 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166482 C7 1996-05-22T12:50:00 ... ZEP 1996 2 16 9 15 0 1996-02-16T09:15:00Z 1996.126736111111 809-91 1847.53 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166483 C7 1996-05-13T11:19:00 ... ZEP 1996 2 16 9 15 0 1996-02-16T09:15:00Z 1996.126736111111 810-91 1850.07 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166484 C7 1996-05-13T11:35:00 ... ZEP 1996 2 22 9 50 0 1996-02-22T09:50:00Z 1996.1431959623558 811-91 1838.95 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166485 C7 1996-05-13T10:47:00 ... ZEP 1996 2 22 9 50 0 1996-02-22T09:50:00Z 1996.1431959623558 812-91 1839.35 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166486 C7 1996-05-13T11:03:00 ... ZEP 1996 2 29 9 30 0 1996-02-29T09:30:00Z 1996.1622836976321 785-91 1830.17 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166487 C7 1996-05-13T12:24:00 ... ZEP 1996 2 29 9 30 0 1996-02-29T09:30:00Z 1996.1622836976321 786-91 1832.45 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166488 C7 1996-05-13T12:40:00 ... ZEP 1996 3 8 9 10 0 1996-03-08T09:10:00Z 1996.1841036733456 1315-91 1846.41 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166489 C7 1996-09-09T11:10:00 ... ZEP 1996 3 8 9 10 0 1996-03-08T09:10:00Z 1996.1841036733456 1316-91 1846.12 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166490 C7 1996-09-09T11:26:00 ... ZEP 1996 3 15 9 40 0 1996-03-15T09:40:00Z 1996.2032862780814 1309-91 1870.76 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166491 C7 1996-09-09T12:14:00 ... ZEP 1996 3 16 8 55 0 1996-03-16T08:55:00Z 1996.205933136005 781-91 1830.39 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166492 C7 1996-05-13T11:51:00 ... ZEP 1996 3 16 8 55 0 1996-03-16T08:55:00Z 1996.205933136005 782-91 1830.12 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166493 C7 1996-05-13T12:07:00 ... ZEP 1996 3 19 13 45 0 1996-03-19T13:45:00Z 1996.2146801001822 795-91 1857.03 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166494 C7 1996-09-09T11:42:00 ... ZEP 1996 3 19 13 45 0 1996-03-19T13:45:00Z 1996.2146801001822 796-91 1858.2 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166495 C7 1996-09-09T11:58:00 ... ZEP 1996 3 20 14 10 0 1996-03-20T14:10:00Z 1996.2174597753492 807-91 1840.39 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166496 C7 1996-09-09T10:37:00 ... ZEP 1996 3 20 14 10 0 1996-03-20T14:10:00Z 1996.2174597753492 808-91 1842.19 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166497 C7 1996-09-09T10:53:00 ... ZEP 1996 3 21 10 5 0 1996-03-21T10:05:00Z 1996.2197271554342 1190-91 1835.68 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166499 C7 1996-09-09T09:06:00 ... ZEP 1996 3 21 10 5 0 1996-03-21T10:05:00Z 1996.2197271554342 583-91 1835.15 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166498 C7 1996-09-09T08:50:00 ... ZEP 1996 3 29 10 5 0 1996-03-29T10:05:00Z 1996.2415850789314 1209-91 1840.04 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166500 C7 1996-07-15T09:19:00 ... ZEP 1996 3 29 10 5 0 1996-03-29T10:05:00Z 1996.2415850789314 1210-91 1838.8 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166501 C7 1996-07-15T09:35:00 ... ZEP 1996 4 4 8 55 0 1996-04-04T08:55:00Z 1996.257845704311 1325-91 1845.13 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166502 C7 1996-07-15T15:57:00 ... ZEP 1996 4 4 8 55 0 1996-04-04T08:55:00Z 1996.257845704311 1326-91 1844.56 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166503 C7 1996-07-15T16:13:00 ... ZEP 1996 4 12 16 30 0 1996-04-12T16:30:00Z 1996.2805669398906 735-91 1841.43 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166504 C7 1996-07-18T09:37:00 ... ZEP 1996 4 12 16 30 0 1996-04-12T16:30:00Z 1996.2805669398906 736-91 1845.65 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166505 C7 1996-07-18T09:53:00 ... ZEP 1996 4 19 9 30 0 1996-04-19T09:30:00Z 1996.29889571949 787-91 1843.39 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166506 C7 1996-07-18T09:05:00 ... ZEP 1996 4 19 9 30 0 1996-04-19T09:30:00Z 1996.29889571949 788-91 1837.57 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166507 C7 1996-07-18T09:21:00 ... ZEP 1996 4 25 8 35 0 1996-04-25T08:35:00Z 1996.3151848057073 783-91 1835.42 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166508 C7 1996-07-15T13:52:00 ... ZEP 1996 4 25 8 35 0 1996-04-25T08:35:00Z 1996.3151848057073 784-91 1835.03 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166509 C7 1996-07-15T14:08:00 ... ZEP 1996 5 2 10 15 0 1996-05-02T10:15:00Z 1996.3345002276867 743-91 1838.71 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166510 C7 1996-07-16T10:26:00 ... ZEP 1996 5 2 10 15 0 1996-05-02T10:15:00Z 1996.3345002276867 744-91 1840.85 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166511 C7 1996-07-16T10:42:00 ... ZEP 1996 5 9 8 20 0 1996-05-09T08:20:00Z 1996.3534077109896 803-91 1839.95 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166512 C7 1996-07-16T08:45:00 ... ZEP 1996 5 9 8 20 0 1996-05-09T08:20:00Z 1996.3534077109896 804-91 1841.41 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166513 C7 1996-07-16T09:01:00 ... ZEP 1996 5 16 8 45 0 1996-05-16T08:45:00Z 1996.3725808287795 813-91 1827.71 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166514 C7 1996-07-16T09:54:00 ... ZEP 1996 5 16 8 45 0 1996-05-16T08:45:00Z 1996.3725808287795 814-91 1827.61 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166515 C7 1996-07-16T10:10:00 ... ZEP 1996 5 24 9 35 0 1996-05-24T09:35:00Z 1996.3945336217364 805-91 1825.57 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166516 C7 1996-07-15T10:24:00 ... ZEP 1996 5 24 9 35 0 1996-05-24T09:35:00Z 1996.3945336217364 806-91 1825.94 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166517 C7 1996-07-15T10:40:00 ... ZEP 1996 5 30 8 45 0 1996-05-30T08:45:00Z 1996.4108321948997 341-91 1826.08 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166518 C7 1996-07-15T09:51:00 ... ZEP 1996 5 30 8 45 0 1996-05-30T08:45:00Z 1996.4108321948997 342-91 3577.21 2.4 78.9067 11.8883 479.0 474.0 5.0 P 166519 C7 1996-07-15T10:08:00 C.. ZEP 1996 6 6 9 15 0 1996-06-06T09:15:00Z 1996.4300147996357 1413-91 1828.75 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166520 C7 1996-07-15T08:46:00 ... ZEP 1996 6 6 9 15 0 1996-06-06T09:15:00Z 1996.4300147996357 1414-91 1831.67 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166521 C7 1996-07-15T09:02:00 ... ZEP 1996 6 9 21 5 0 1996-06-09T21:05:00Z 1996.4395586672738 739-91 1831.53 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166522 C7 1996-09-16T09:31:00 ... ZEP 1996 6 9 21 5 0 1996-06-09T21:05:00Z 1996.4395586672738 740-91 1837.95 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166523 C7 1996-09-16T09:47:00 ... ZEP 1996 6 10 23 10 0 1996-06-10T23:10:00Z 1996.44252808136 793-91 1832.06 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166524 C7 1996-09-16T08:26:00 ... ZEP 1996 6 10 23 10 0 1996-06-10T23:10:00Z 1996.44252808136 794-91 1834.35 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166525 C7 1996-09-16T08:42:00 ... ZEP 1996 6 12 19 30 0 1996-06-12T19:30:00Z 1996.447575136612 733-91 1826.19 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166526 C7 1996-09-09T08:17:00 ... ZEP 1996 6 12 19 30 0 1996-06-12T19:30:00Z 1996.447575136612 734-91 1826.45 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166527 C7 1996-09-09T08:33:00 ... ZEP 1996 6 14 9 30 0 1996-06-14T09:30:00Z 1996.451901183971 801-91 1831.93 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166528 C7 1996-09-06T13:06:00 ... ZEP 1996 6 14 9 30 0 1996-06-14T09:30:00Z 1996.451901183971 802-91 1840.53 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166529 C7 1996-09-06T13:23:00 ... ZEP 1996 6 16 7 55 0 1996-06-16T07:55:00Z 1996.457185412872 815-91 1829.82 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166530 C7 1996-09-09T14:00:00 ... ZEP 1996 6 16 7 55 0 1996-06-16T07:55:00Z 1996.457185412872 816-91 1828.91 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166531 C7 1996-09-09T14:16:00 ... ZEP 1996 6 17 8 40 0 1996-06-17T08:40:00Z 1996.4600030358226 791-91 1821.87 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166532 C7 1996-09-09T14:32:00 ... ZEP 1996 6 17 8 40 0 1996-06-17T08:40:00Z 1996.4600030358226 792-91 1822.88 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166533 C7 1996-09-09T14:48:00 ... ZEP 1996 6 18 8 40 0 1996-06-18T08:40:00Z 1996.4627352762598 927-91 1822.65 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166534 C7 1996-09-16T10:10:00 ... ZEP 1996 6 18 8 40 0 1996-06-18T08:40:00Z 1996.4627352762598 928-91 1822.36 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166535 C7 1996-09-16T10:26:00 ... ZEP 1996 6 19 9 50 0 1996-06-19T09:50:00Z 1996.4656003339405 799-91 1821.8 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166536 C7 1996-09-09T13:27:00 ... ZEP 1996 6 19 9 50 0 1996-06-19T09:50:00Z 1996.4656003339405 800-91 1821.23 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166537 C7 1996-09-09T13:44:00 ... ZEP 1996 6 20 8 30 0 1996-06-20T08:30:00Z 1996.4681807832424 747-91 1823.15 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166538 C7 1996-09-09T12:55:00 ... ZEP 1996 6 20 8 30 0 1996-06-20T08:30:00Z 1996.4681807832424 748-91 1816.0 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166539 C7 1996-09-09T13:11:00 ... ZEP 1996 6 22 16 40 0 1996-06-22T16:40:00Z 1996.474574984821 737-91 1841.7 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166540 C7 1996-09-09T09:22:00 ... ZEP 1996 6 22 16 40 0 1996-06-22T16:40:00Z 1996.474574984821 738-91 1841.2 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166541 C7 1996-09-09T09:38:00 ... ZEP 1996 6 23 7 45 0 1996-06-23T07:45:00Z 1996.4762921220401 789-91 1849.82 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166542 C7 1996-09-09T09:54:00 ... ZEP 1996 6 23 7 45 0 1996-06-23T07:45:00Z 1996.4762921220401 790-91 1849.48 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166543 C7 1996-09-09T10:10:00 ... ZEP 1996 6 23 19 10 0 1996-06-23T19:10:00Z 1996.477591833637 745-91 1832.02 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166544 C7 1996-09-16T08:59:00 ... ZEP 1996 6 23 19 10 0 1996-06-23T19:10:00Z 1996.477591833637 746-91 1831.5 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166545 C7 1996-09-16T09:15:00 ... ZEP 1996 6 24 8 30 0 1996-06-24T08:30:00Z 1996.4791097449909 741-91 1826.34 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166546 C7 1996-09-16T11:46:00 ... ZEP 1996 6 24 8 30 0 1996-06-24T08:30:00Z 1996.4791097449909 742-91 1823.69 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166547 C7 1996-09-16T12:03:00 ... ZEP 1996 6 25 13 50 0 1996-06-25T13:50:00Z 1996.4824491499696 835-91 1830.24 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166548 C7 1996-09-13T14:24:00 ... ZEP 1996 6 25 13 50 0 1996-06-25T13:50:00Z 1996.4824491499696 836-91 1825.35 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166549 C7 1996-09-13T14:40:00 ... ZEP 1996 6 26 13 5 0 1996-06-26T13:05:00Z 1996.4850960078932 127-91 1818.24 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166550 C7 1996-09-13T15:30:00 ... ZEP 1996 6 26 13 5 0 1996-06-26T13:05:00Z 1996.4850960078932 128-91 1818.2 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166551 C7 1996-09-13T15:46:00 ... ZEP 1996 6 28 8 30 0 1996-06-28T08:30:00Z 1996.4900387067396 273-91 1819.76 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166552 C7 1996-09-13T16:03:00 ... ZEP 1996 6 28 8 30 0 1996-06-28T08:30:00Z 1996.4900387067396 274-91 1822.0 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166553 C7 1996-09-13T16:19:00 ... ZEP 1996 7 5 9 25 0 1996-07-05T09:25:00Z 1996.5092687462052 1735-91 1812.96 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166554 C7 1996-09-13T08:02:00 ... ZEP 1996 7 5 9 25 0 1996-07-05T09:25:00Z 1996.5092687462052 1736-91 1806.54 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166555 C7 1996-09-13T08:19:00 ... ZEP 1996 7 11 9 7 0 1996-07-11T09:07:00Z 1996.5256280358228 821-91 1803.54 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166556 C7 1996-09-13T12:35:00 ... ZEP 1996 7 18 9 15 0 1996-07-18T09:15:00Z 1996.5447688979964 1487-91 1803.48 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166557 C7 1996-09-10T09:41:00 ... ZEP 1996 7 18 9 15 0 1996-07-18T09:15:00Z 1996.5447688979964 1488-91 1805.53 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166558 C7 1996-09-10T09:57:00 ... ZEP 1996 7 25 9 5 0 1996-07-25T09:05:00Z 1996.5638756071646 849-91 1804.67 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166559 C7 1996-09-10T10:14:00 ... ZEP 1996 7 25 9 5 0 1996-07-25T09:05:00Z 1996.5638756071646 850-91 1804.17 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166560 C7 1996-09-10T10:30:00 ... ZEP 1996 8 2 8 48 0 1996-08-02T08:48:00Z 1996.5857012750455 811-91 -999.99 -999.999 78.9067 11.8883 479.0 474.0 5.0 P 166561 C7 1996-11-01T09:06:00 M.. ZEP 1996 8 2 8 48 0 1996-08-02T08:48:00Z 1996.5857012750455 812-91 -999.99 -999.999 78.9067 11.8883 479.0 474.0 5.0 P 166562 C7 1996-11-01T09:23:00 M.. ZEP 1996 8 8 7 57 0 1996-08-08T07:57:00Z 1996.6019979508196 781-91 1811.21 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166563 C7 1996-11-01T07:29:00 ... ZEP 1996 8 8 7 57 0 1996-08-08T07:57:00Z 1996.6019979508196 782-91 1815.75 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166564 C7 1996-11-01T07:45:00 ... ZEP 1996 8 15 9 25 0 1996-08-15T09:25:00Z 1996.6212906041287 809-91 1812.49 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166565 C7 1996-10-31T13:43:00 ... ZEP 1996 8 15 9 25 0 1996-08-15T09:25:00Z 1996.6212906041287 810-91 1811.87 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166566 C7 1996-10-31T13:59:00 ... ZEP 1996 8 22 8 24 0 1996-08-22T08:24:00Z 1996.640300546448 785-91 1812.05 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166567 C7 1996-10-31T14:16:00 ... ZEP 1996 8 22 8 24 0 1996-08-22T08:24:00Z 1996.640300546448 786-91 1809.77 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166568 C7 1996-10-31T14:32:00 ... ZEP 1996 8 31 9 0 0 1996-08-31T09:00:00Z 1996.6649590163934 783-91 1812.86 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166569 C7 1996-10-31T14:48:00 ... ZEP 1996 8 31 9 0 0 1996-08-31T09:00:00Z 1996.6649590163934 784-91 1813.17 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166570 C7 1996-10-31T15:04:00 ... ZEP 1996 9 5 7 45 0 1996-09-05T07:45:00Z 1996.6784779143898 805-91 1822.07 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166571 C7 1996-10-31T13:11:00 ... ZEP 1996 9 5 7 45 0 1996-09-05T07:45:00Z 1996.6784779143898 806-91 1823.33 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166572 C7 1996-10-31T13:27:00 ... ZEP 1996 9 13 9 35 0 1996-09-13T09:35:00Z 1996.7005445506982 691-91 1853.7 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166573 C7 1996-11-01T08:01:00 ... ZEP 1996 9 13 9 35 0 1996-09-13T09:35:00Z 1996.7005445506982 692-91 1857.98 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166574 C7 1996-11-01T08:17:00 ... ZEP 1996 9 19 8 46 0 1996-09-19T08:46:00Z 1996.7168450212507 855-91 1837.37 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166575 C7 1996-11-01T08:33:00 ... ZEP 1996 9 19 8 46 0 1996-09-19T08:46:00Z 1996.7168450212507 856-91 1839.17 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166576 C7 1996-11-01T08:50:00 ... ZEP 1996 9 26 8 35 0 1996-09-26T08:35:00Z 1996.7359498330297 813-91 1830.8 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166577 C7 1997-01-17T09:26:00 ... ZEP 1996 9 26 8 35 0 1996-09-26T08:35:00Z 1996.7359498330297 814-91 1835.51 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166578 C7 1997-01-17T09:42:00 ... ZEP 1996 10 3 8 30 0 1996-10-03T08:30:00Z 1996.7550660291438 803-91 1825.91 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166579 C7 1997-01-17T08:54:00 ... ZEP 1996 10 3 8 30 0 1996-10-03T08:30:00Z 1996.7550660291438 804-91 1822.86 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166580 C7 1997-01-17T09:10:00 ... ZEP 1996 10 10 7 55 0 1996-10-10T07:55:00Z 1996.7741253035822 1209-91 1859.32 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166581 C7 1997-01-17T10:36:00 ... ZEP 1996 10 10 7 55 0 1996-10-10T07:55:00Z 1996.7741253035822 1210-91 1854.61 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166582 C7 1997-01-17T10:52:00 ... ZEP 1996 10 17 8 30 0 1996-10-17T08:30:00Z 1996.793317395264 63-91 1834.41 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166583 C7 1997-01-15T10:03:00 ... ZEP 1996 10 17 8 30 0 1996-10-17T08:30:00Z 1996.793317395264 64-91 1836.49 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166584 C7 1997-01-15T10:19:00 ... ZEP 1996 10 24 8 45 0 1996-10-24T08:45:00Z 1996.812471539162 1155-91 1840.37 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166585 C7 1997-01-15T14:15:00 ... ZEP 1996 10 24 8 45 0 1996-10-24T08:45:00Z 1996.812471539162 1156-91 1841.51 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166586 C7 1997-01-15T14:31:00 ... ZEP 1996 11 1 9 55 0 1996-11-01T09:55:00Z 1996.834462279903 1743-91 1874.54 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166587 C7 1997-01-15T12:55:00 ... ZEP 1996 11 1 9 55 0 1996-11-01T09:55:00Z 1996.834462279903 1744-91 1870.69 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166588 C7 1997-01-15T13:11:00 ... ZEP 1996 11 7 8 35 0 1996-11-07T08:35:00Z 1996.8507039313904 802-91 1864.2 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166589 C7 1997-01-16T12:50:00 ... ZEP 1996 11 15 13 30 0 1996-11-15T13:30:00Z 1996.8731215846994 799-91 1862.11 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166590 C7 1997-01-14T14:27:00 ... ZEP 1996 11 15 13 30 0 1996-11-15T13:30:00Z 1996.8731215846994 800-91 1856.0 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166591 C7 1997-01-14T14:43:00 ... ZEP 1996 11 22 9 55 0 1996-11-22T09:55:00Z 1996.8918393290833 793-91 1854.11 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166592 C7 1997-03-21T09:18:00 ... ZEP 1996 11 22 9 55 0 1996-11-22T09:55:00Z 1996.8918393290833 794-91 1846.82 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166593 C7 1997-03-21T09:34:00 ... ZEP 1996 11 28 8 20 0 1996-11-28T08:20:00Z 1996.9080525197328 733-91 1835.16 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166594 C7 1997-03-21T08:46:00 ... ZEP 1996 11 28 8 20 0 1996-11-28T08:20:00Z 1996.9080525197328 734-91 1838.77 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166595 C7 1997-03-21T09:02:00 ... ZEP 1996 12 5 9 0 0 1996-12-05T09:00:00Z 1996.9272540983607 2043-91 1850.5 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166596 C7 1997-03-19T10:32:00 ... ZEP 1996 12 5 9 0 0 1996-12-05T09:00:00Z 1996.9272540983607 2044-91 1841.19 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166597 C7 1997-03-19T10:48:00 ... ZEP 1996 12 12 9 0 0 1996-12-12T09:00:00Z 1996.9463797814208 2039-91 1845.72 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166598 C7 1997-03-19T11:04:00 ... ZEP 1996 12 12 9 0 0 1996-12-12T09:00:00Z 1996.9463797814208 2040-91 1848.79 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166599 C7 1997-03-19T11:20:00 ... ZEP 1996 12 19 9 30 0 1996-12-19T09:30:00Z 1996.9655623861568 795-91 1836.94 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166600 C7 1997-03-20T08:12:00 ... ZEP 1996 12 19 9 30 0 1996-12-19T09:30:00Z 1996.9655623861568 796-91 1832.79 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166601 C7 1997-03-20T08:28:00 ... ZEP 1996 12 26 8 45 0 1996-12-26T08:45:00Z 1996.984602686703 789-91 1852.1 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166602 C7 1997-03-20T09:49:00 ... ZEP 1996 12 26 8 45 0 1996-12-26T08:45:00Z 1996.984602686703 790-91 1872.42 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166603 C7 1997-03-20T10:05:00 C.. ZEP 1997 1 3 8 40 0 1997-01-03T08:40:00Z 1997.0064687975646 811-91 1859.78 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166604 C7 1997-03-19T12:13:00 ... ZEP 1997 1 3 8 40 0 1997-01-03T08:40:00Z 1997.0064687975646 812-91 1863.49 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166605 C7 1997-03-19T12:29:00 ... ZEP 1997 1 9 9 50 0 1997-01-09T09:50:00Z 1997.0230403348553 739-91 1872.8 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166606 C7 1997-03-19T12:45:00 ... ZEP 1997 1 9 9 50 0 1997-01-09T09:50:00Z 1997.0230403348553 740-91 1870.26 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166607 C7 1997-03-19T13:01:00 ... ZEP 1997 1 16 8 45 0 1997-01-16T08:45:00Z 1997.0420947488585 783-91 1923.65 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166608 C7 1997-04-18T14:19:00 .S. ZEP 1997 1 16 8 45 0 1997-01-16T08:45:00Z 1997.0420947488585 784-91 1929.46 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166609 C7 1997-04-18T14:35:00 .S. ZEP 1997 1 24 9 30 0 1997-01-24T09:30:00Z 1997.064098173516 785-91 1841.02 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166610 C7 1997-04-18T14:51:00 ... ZEP 1997 1 24 9 30 0 1997-01-24T09:30:00Z 1997.064098173516 786-91 1847.23 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166611 C7 1997-04-18T15:07:00 ... ZEP 1997 1 30 9 45 0 1997-01-30T09:45:00Z 1997.0805650684931 703-91 1863.01 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166612 C7 1997-04-18T12:37:00 ... ZEP 1997 1 30 9 45 0 1997-01-30T09:45:00Z 1997.0805650684931 704-91 1865.85 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166613 C7 1997-04-18T12:53:00 ... ZEP 1997 2 6 9 20 0 1997-02-06T09:20:00Z 1997.0996955859969 7-91 1887.39 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166614 C7 1997-04-18T11:32:00 ... ZEP 1997 2 6 9 20 0 1997-02-06T09:20:00Z 1997.0996955859969 8-91 1890.33 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166615 C7 1997-04-18T11:48:00 ... ZEP 1997 2 14 9 25 0 1997-02-14T09:25:00Z 1997.1216229071538 809-91 1864.74 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166616 C7 1997-04-18T13:09:00 ... ZEP 1997 2 14 9 25 0 1997-02-14T09:25:00Z 1997.1216229071538 810-91 1863.52 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166617 C7 1997-04-18T13:25:00 ... ZEP 1997 2 22 9 55 0 1997-02-22T09:55:00Z 1997.1435977929984 805-91 1865.14 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166618 C7 1997-04-18T10:46:00 ... ZEP 1997 2 22 9 55 0 1997-02-22T09:55:00Z 1997.1435977929984 806-91 1863.52 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166619 C7 1997-04-18T11:02:00 ... ZEP 1997 2 27 8 45 0 1997-02-27T08:45:00Z 1997.1571632420091 53-91 1943.5 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166620 C7 1997-04-18T12:05:00 .S. ZEP 1997 2 27 8 45 0 1997-02-27T08:45:00Z 1997.1571632420091 54-91 1945.59 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166621 C7 1997-04-18T12:21:00 .S. ZEP 1997 3 6 9 59 0 1997-03-06T09:59:00Z 1997.1764821156773 1072-91 1851.83 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166622 C7 1997-04-18T15:39:00 ... ZEP 1997 3 21 9 35 0 1997-03-21T09:35:00Z 1997.2175323439878 627-91 1849.99 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166623 C7 1997-05-29T12:22:00 ... ZEP 1997 3 21 9 35 0 1997-03-21T09:35:00Z 1997.2175323439878 628-91 1848.99 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166624 C7 1997-05-29T12:38:00 ... ZEP 1997 3 21 9 35 0 1997-03-21T09:35:00Z 1997.2175323439878 628-91 1853.65 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166624 H4 1997-05-30T12:48:00 ... ZEP 1997 3 27 9 0 0 1997-03-27T09:00:00Z 1997.233904109589 1915-91 1850.04 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166625 C7 1997-05-29T12:55:00 ... ZEP 1997 3 27 9 0 0 1997-03-27T09:00:00Z 1997.233904109589 1916-91 1845.5 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166626 C7 1997-05-29T13:11:00 ... ZEP 1997 3 27 9 0 0 1997-03-27T09:00:00Z 1997.233904109589 1916-91 1846.81 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166626 H4 1997-05-30T13:15:00 ... ZEP 1997 4 3 8 50 0 1997-04-03T08:50:00Z 1997.2530631659056 1321-91 1838.09 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166627 C7 1997-06-18T09:35:00 C.. ZEP 1997 4 3 8 50 0 1997-04-03T08:50:00Z 1997.2530631659056 1322-91 1825.97 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166628 C7 1997-06-18T09:51:00 C.. ZEP 1997 4 3 8 50 0 1997-04-03T08:50:00Z 1997.2530631659056 1322-91 1826.3 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166628 H4 1997-06-18T14:52:00 C.. ZEP 1997 4 10 8 30 0 1997-04-10T08:30:00Z 1997.272203196347 75-91 1834.73 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166629 C7 1997-06-18T10:07:00 ... ZEP 1997 4 10 8 30 0 1997-04-10T08:30:00Z 1997.272203196347 76-91 1833.16 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166630 C7 1997-06-18T10:23:00 ... ZEP 1997 4 10 8 30 0 1997-04-10T08:30:00Z 1997.272203196347 76-91 1835.39 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166630 H4 1997-06-18T14:25:00 ... ZEP 1997 4 10 9 35 0 1997-04-10T09:35:00Z 1997.2723268645357 803-91 1906.57 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166631 C7 1997-06-05T12:30:00 .S. ZEP 1997 4 10 9 35 0 1997-04-10T09:35:00Z 1997.2723268645357 804-91 1906.41 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166632 C7 1997-06-05T12:47:00 .S. ZEP 1997 4 10 9 35 0 1997-04-10T09:35:00Z 1997.2723268645357 804-91 1911.27 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166632 H4 1997-06-06T10:41:00 .S. ZEP 1997 4 17 8 35 0 1997-04-17T08:35:00Z 1997.2913907914765 197-91 1840.32 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166633 C7 1997-06-05T08:29:00 ... ZEP 1997 4 17 8 35 0 1997-04-17T08:35:00Z 1997.2913907914765 198-91 1838.26 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166634 C7 1997-06-05T08:45:00 ... ZEP 1997 4 17 8 35 0 1997-04-17T08:35:00Z 1997.2913907914765 198-91 1839.61 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166634 H4 1997-06-06T12:59:00 ... ZEP 1997 4 17 10 30 0 1997-04-17T10:30:00Z 1997.2916095890412 813-91 1843.92 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166635 C7 1997-06-05T13:03:00 ... ZEP 1997 4 17 10 30 0 1997-04-17T10:30:00Z 1997.2916095890412 814-91 1791.79 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166636 C7 1997-06-05T13:19:00 C.. ZEP 1997 4 17 10 30 0 1997-04-17T10:30:00Z 1997.2916095890412 814-91 1792.02 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166636 H4 1997-06-06T12:18:00 C.. ZEP 1997 4 25 13 35 0 1997-04-25T13:35:00Z 1997.3138793759513 1677-91 1850.03 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166637 C7 1997-06-05T10:05:00 ... ZEP 1997 4 25 13 35 0 1997-04-25T13:35:00Z 1997.3138793759513 1678-91 1848.68 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166638 C7 1997-06-05T10:21:00 ... ZEP 1997 4 25 13 35 0 1997-04-25T13:35:00Z 1997.3138793759513 1678-91 1850.72 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166638 H4 1997-06-06T12:45:00 ... ZEP 1997 5 2 8 15 0 1997-05-02T08:15:00Z 1997.332448630137 4191-91 1844.22 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166639 C7 1997-06-23T08:00:00 ... ZEP 1997 5 2 8 15 0 1997-05-02T08:15:00Z 1997.332448630137 4192-91 1845.58 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166640 C7 1997-06-23T08:16:00 ... ZEP 1997 5 2 8 15 0 1997-05-02T08:15:00Z 1997.332448630137 4192-91 1845.33 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166640 H4 1997-06-23T14:47:00 ... ZEP 1997 5 8 7 25 0 1997-05-08T07:25:00Z 1997.3487918569253 4189-91 1861.87 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166641 C7 1997-06-23T08:32:00 ... ZEP 1997 5 8 7 25 0 1997-05-08T07:25:00Z 1997.3487918569253 4190-91 1863.08 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166642 C7 1997-06-23T08:48:00 ... ZEP 1997 5 8 7 25 0 1997-05-08T07:25:00Z 1997.3487918569253 4190-91 1862.34 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166642 H4 1997-06-23T14:33:00 ... ZEP 1997 5 15 8 25 0 1997-05-15T08:25:00Z 1997.3680840943684 1175-91 1793.86 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166643 C7 1997-06-19T14:35:00 C.. ZEP 1997 5 15 8 25 0 1997-05-15T08:25:00Z 1997.3680840943684 1176-91 1837.58 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166644 C7 1997-06-19T14:51:00 ... ZEP 1997 5 15 8 25 0 1997-05-15T08:25:00Z 1997.3680840943684 1176-91 1834.31 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166644 H4 1997-06-23T10:03:00 ... ZEP 1997 5 22 13 30 0 1997-05-22T13:30:00Z 1997.3878424657535 449-91 1827.91 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166645 C7 1997-06-19T14:02:00 ..M ZEP 1997 5 22 13 30 0 1997-05-22T13:30:00Z 1997.3878424657535 450-91 1825.43 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166646 C7 1997-06-19T14:18:00 ..M ZEP 1997 5 22 13 30 0 1997-05-22T13:30:00Z 1997.3878424657535 450-91 1830.43 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166646 H4 1997-06-23T09:49:00 ... ZEP 1997 5 29 8 10 0 1997-05-29T08:10:00Z 1997.4064117199391 5-91 1820.27 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166647 H4 1997-08-15T14:59:00 ... ZEP 1997 5 29 8 10 0 1997-05-29T08:10:00Z 1997.4064117199391 6-91 1818.59 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166648 H4 1997-08-15T15:13:00 ... ZEP 1997 6 6 9 35 0 1997-06-06T09:35:00Z 1997.4284912480973 527-91 1820.73 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166649 H4 1997-08-15T15:54:00 ... ZEP 1997 6 6 9 35 0 1997-06-06T09:35:00Z 1997.4284912480973 528-91 1799.96 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166650 H4 1997-08-15T16:08:00 C.. ZEP 1997 6 12 7 38 0 1997-06-12T07:38:00Z 1997.4447070015221 1983-91 1821.99 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166651 C7 1997-08-04T13:14:00 ... ZEP 1997 6 12 7 38 0 1997-06-12T07:38:00Z 1997.4447070015221 1984-91 1816.22 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166652 C7 1997-08-04T13:30:00 ... ZEP 1997 6 19 6 55 0 1997-06-19T06:55:00Z 1997.4638032724506 1247-91 1822.54 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166653 C7 1997-07-22T13:31:00 ... ZEP 1997 6 19 6 55 0 1997-06-19T06:55:00Z 1997.4638032724506 1248-91 1819.45 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166654 C7 1997-07-22T13:47:00 ... ZEP 1997 6 19 6 55 0 1997-06-19T06:55:00Z 1997.4638032724506 1248-91 1819.09 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166654 H4 1997-07-23T14:04:00 ... ZEP 1997 6 26 8 0 0 1997-06-26T08:00:00Z 1997.483105022831 1719-91 1814.44 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166655 C7 1997-07-22T14:04:00 ... ZEP 1997 6 26 8 0 0 1997-06-26T08:00:00Z 1997.483105022831 1720-91 1818.57 2.71 78.9067 11.8883 479.0 474.0 5.0 P 166656 C7 1997-07-22T14:20:00 ... ZEP 1997 6 26 8 0 0 1997-06-26T08:00:00Z 1997.483105022831 1720-91 1823.34 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166656 H4 1997-07-23T13:51:00 ... ZEP 1997 7 3 7 0 0 1997-07-03T07:00:00Z 1997.5021689497717 733-91 1806.95 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166657 H4 1997-08-29T10:47:00 ... ZEP 1997 7 3 7 0 0 1997-07-03T07:00:00Z 1997.5021689497717 734-91 1805.63 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166658 H4 1997-08-29T11:00:00 ... ZEP 1997 7 10 7 50 0 1997-07-10T07:50:00Z 1997.5214421613393 795-91 1807.85 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166659 H4 1997-08-08T11:49:00 ... ZEP 1997 7 10 7 50 0 1997-07-10T07:50:00Z 1997.5214421613393 796-91 1806.84 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166660 H4 1997-08-08T11:59:00 ... ZEP 1997 7 17 8 55 0 1997-07-17T08:55:00Z 1997.54074391172 801-91 1810.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166661 H4 1997-08-11T13:09:00 ... ZEP 1997 7 17 8 55 0 1997-07-17T08:55:00Z 1997.54074391172 802-91 1813.91 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166662 H4 1997-08-11T13:19:00 ... ZEP 1997 7 24 7 5 0 1997-07-24T07:05:00Z 1997.5597127092847 793-91 1802.81 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166663 H4 1997-08-29T10:19:00 ... ZEP 1997 7 24 7 5 0 1997-07-24T07:05:00Z 1997.5597127092847 794-91 1802.67 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166664 H4 1997-08-29T10:33:00 ... ZEP 1997 7 31 6 50 0 1997-07-31T06:50:00Z 1997.5788622526636 1915-91 1805.15 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166665 H4 1997-09-03T08:38:00 ... ZEP 1997 7 31 6 50 0 1997-07-31T06:50:00Z 1997.5788622526636 1916-91 1804.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166666 H4 1997-09-03T08:52:00 ... ZEP 1997 8 8 8 8 0 1997-08-08T08:08:00Z 1997.6009284627094 1061-91 1811.73 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166667 H4 1997-09-02T14:31:00 ... ZEP 1997 8 8 8 8 0 1997-08-08T08:08:00Z 1997.6009284627094 1062-91 1809.39 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166668 H4 1997-09-02T14:45:00 ... ZEP 1997 9 4 7 10 0 1997-09-04T07:10:00Z 1997.6747907153729 813-91 1816.9 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166669 H4 1997-09-30T09:24:00 ... ZEP 1997 9 4 7 10 0 1997-09-04T07:10:00Z 1997.6747907153729 814-91 1811.99 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166670 H4 1997-09-30T09:37:00 ... ZEP 1997 9 11 7 20 0 1997-09-11T07:20:00Z 1997.6939878234398 803-91 1818.89 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166671 H4 1997-09-30T11:40:00 ... ZEP 1997 9 11 7 20 0 1997-09-11T07:20:00Z 1997.6939878234398 804-91 1819.42 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166672 H4 1997-09-30T11:53:00 ... ZEP 1997 9 25 8 34 0 1997-09-25T08:34:00Z 1997.7324847792997 4441-91 1834.3 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166673 H4 1997-11-14T12:46:00 ... ZEP 1997 9 25 8 34 0 1997-09-25T08:34:00Z 1997.7324847792997 4442-91 1843.51 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166674 H4 1997-11-14T12:59:00 ... ZEP 1997 10 1 12 37 0 1997-10-01T12:37:00Z 1997.7493854642314 506-91 1821.31 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166675 H4 1997-11-03T13:54:00 ... ZEP 1997 10 1 12 37 0 1997-10-01T12:37:00Z 1997.7493854642314 745-91 1822.31 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166676 H4 1997-11-03T13:41:00 ... ZEP 1997 10 2 8 36 0 1997-10-02T08:36:00Z 1997.7516666666668 127-91 1816.82 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166677 H4 1997-11-14T13:41:00 ... ZEP 1997 10 2 8 36 0 1997-10-02T08:36:00Z 1997.7516666666668 128-91 1818.26 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166678 H4 1997-11-14T13:55:00 ... ZEP 1997 10 9 8 15 0 1997-10-09T08:15:00Z 1997.7708047945205 4413-91 1832.55 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166679 H4 1997-11-14T14:08:00 ... ZEP 1997 10 9 8 15 0 1997-10-09T08:15:00Z 1997.7708047945205 4414-91 1832.41 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166680 H4 1997-11-14T14:21:00 ... ZEP 1997 10 16 7 40 0 1997-10-16T07:40:00Z 1997.7899162861493 523-91 1827.96 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166681 H4 1997-11-14T13:13:00 ... ZEP 1997 10 16 7 40 0 1997-10-16T07:40:00Z 1997.7899162861493 524-91 1828.62 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166682 H4 1997-11-14T13:26:00 ... ZEP 1997 11 6 7 55 0 1997-11-06T07:55:00Z 1997.8474790715372 4401-91 1853.9 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166683 H4 1997-12-17T10:11:00 ... ZEP 1997 11 6 7 55 0 1997-11-06T07:55:00Z 1997.8474790715372 4402-91 1855.69 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166684 H4 1997-12-17T10:24:00 ... ZEP 1997 11 13 8 25 0 1997-11-13T08:25:00Z 1997.8667142313545 4379-91 1838.23 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166685 H4 1997-12-17T09:44:00 ... ZEP 1997 11 13 8 25 0 1997-11-13T08:25:00Z 1997.8667142313545 4380-91 1837.13 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166686 H4 1997-12-17T09:57:00 ... ZEP 1997 11 21 7 43 0 1997-11-21T07:43:00Z 1997.888552130898 813-91 1844.76 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166687 H4 1998-01-20T11:24:00 ... ZEP 1997 11 21 7 43 0 1997-11-21T07:43:00Z 1997.888552130898 814-91 1844.72 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166688 H4 1998-01-20T11:37:00 ... ZEP 1997 11 27 12 31 0 1997-11-27T12:31:00Z 1997.9055384322678 733-91 1839.18 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166689 H4 1998-01-20T11:51:00 ... ZEP 1997 11 27 12 31 0 1997-11-27T12:31:00Z 1997.9055384322678 734-91 1840.94 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166690 H4 1998-01-20T12:05:00 ... ZEP 1997 12 5 9 23 0 1997-12-05T09:23:00Z 1997.9270985540336 811-91 1830.55 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166691 H4 1998-02-11T12:14:00 ... ZEP 1997 12 5 9 23 0 1997-12-05T09:23:00Z 1997.9270985540336 812-91 1831.49 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166692 H4 1998-02-11T12:28:00 ... ZEP 1997 12 12 12 58 0 1997-12-12T12:58:00Z 1997.946685692542 739-91 1847.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166693 H4 1998-02-11T10:52:00 ... ZEP 1997 12 12 12 58 0 1997-12-12T12:58:00Z 1997.946685692542 740-91 1848.49 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166694 H4 1998-02-11T11:05:00 ... ZEP 1997 12 18 9 52 0 1997-12-18T09:52:00Z 1997.9627701674276 457-91 1841.97 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166695 H4 1998-01-26T16:15:00 ... ZEP 1997 12 18 9 52 0 1997-12-18T09:52:00Z 1997.9627701674276 458-91 1843.6 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166696 H4 1998-01-26T16:29:00 ... ZEP 1997 12 25 9 32 0 1997-12-25T09:32:00Z 1997.9819101978692 4289-91 1895.28 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166697 H4 1998-01-27T10:23:00 C.. ZEP 1997 12 25 9 32 0 1997-12-25T09:32:00Z 1997.9819101978692 4290-91 1853.97 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166698 H4 1998-01-27T10:37:00 ... ZEP 1998 1 1 10 13 0 1998-01-01T10:13:00Z 1998.001166286149 617-91 1837.33 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166699 H4 1998-02-16T10:20:00 ... ZEP 1998 1 1 10 13 0 1998-01-01T10:13:00Z 1998.001166286149 618-91 1837.49 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166700 H4 1998-02-16T10:34:00 ... ZEP 1998 1 8 6 55 0 1998-01-08T06:55:00Z 1998.019967656012 271-91 1867.02 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166701 H4 1998-02-13T16:19:00 ... ZEP 1998 1 8 6 55 0 1998-01-08T06:55:00Z 1998.019967656012 272-91 1870.08 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166702 H4 1998-02-13T16:33:00 ... ZEP 1998 1 16 8 55 0 1998-01-16T08:55:00Z 1998.0421137747337 4685-91 1896.39 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166703 H4 1998-02-27T16:14:00 ... ZEP 1998 1 16 8 55 0 1998-01-16T08:55:00Z 1998.0421137747337 4686-91 1894.95 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166704 H4 1998-02-27T16:27:00 ... ZEP 1998 1 29 8 45 0 1998-01-29T08:45:00Z 1998.0777111872146 4683-91 1894.47 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166705 H4 1998-02-27T14:50:00 ... ZEP 1998 1 29 8 45 0 1998-01-29T08:45:00Z 1998.0777111872146 4684-91 1895.56 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166706 H4 1998-02-27T15:04:00 ... ZEP 1998 2 20 8 50 0 1998-02-20T08:50:00Z 1998.137994672755 155-91 1852.45 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166707 H4 1998-03-25T11:56:00 ... ZEP 1998 2 20 8 50 0 1998-02-20T08:50:00Z 1998.137994672755 156-91 1850.66 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166708 H4 1998-03-25T12:10:00 ... ZEP 1998 2 26 9 45 0 1998-02-26T09:45:00Z 1998.154537671233 1355-91 1843.93 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166709 H4 1998-03-25T11:29:00 ... ZEP 1998 2 26 9 45 0 1998-02-26T09:45:00Z 1998.154537671233 1356-91 1843.31 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166710 H4 1998-03-25T11:42:00 ... ZEP 1998 3 5 9 34 0 1998-03-05T09:34:00Z 1998.173694824962 487-91 1898.18 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166711 H4 1998-04-14T11:18:00 ... ZEP 1998 3 5 9 34 0 1998-03-05T09:34:00Z 1998.173694824962 488-91 1898.57 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166712 H4 1998-04-14T11:32:00 ... ZEP 1998 3 12 9 5 0 1998-03-12T09:05:00Z 1998.1928177321156 1683-91 1850.23 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166713 H4 1998-04-14T14:34:00 ... ZEP 1998 3 12 9 5 0 1998-03-12T09:05:00Z 1998.1928177321156 1684-91 1848.28 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166714 H4 1998-04-14T14:47:00 ... ZEP 1998 3 20 7 55 0 1998-03-20T07:55:00Z 1998.2146023592086 4611-91 1855.41 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166715 H4 1998-04-22T10:03:00 ... ZEP 1998 3 20 7 55 0 1998-03-20T07:55:00Z 1998.2146023592086 4612-91 1854.55 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166716 H4 1998-04-22T10:17:00 ... ZEP 1998 4 3 8 35 0 1998-04-03T08:35:00Z 1998.2530346270928 4161-91 1843.84 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166717 H4 1998-05-19T15:10:00 ... ZEP 1998 4 3 8 35 0 1998-04-03T08:35:00Z 1998.2530346270928 4162-91 1845.05 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166718 H4 1998-05-19T15:23:00 ... ZEP 1998 4 9 8 7 0 1998-04-09T08:07:00Z 1998.2694197108067 1079-91 1846.8 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166719 H4 1998-05-19T14:43:00 ... ZEP 1998 4 9 8 7 0 1998-04-09T08:07:00Z 1998.2694197108067 1080-91 1847.49 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166720 H4 1998-05-19T14:56:00 ... ZEP 1998 4 16 9 12 0 1998-04-16T09:12:00Z 1998.2887214611872 1389-91 1851.67 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166721 H4 1998-06-23T12:30:00 ... ZEP 1998 4 16 9 12 0 1998-04-16T09:12:00Z 1998.2887214611872 1390-91 1851.82 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166722 H4 1998-06-23T12:44:00 ... ZEP 1998 4 24 6 40 0 1998-04-24T06:40:00Z 1998.3103500761035 759-91 1851.7 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166723 H4 1998-06-23T12:59:00 ... ZEP 1998 4 24 6 40 0 1998-04-24T06:40:00Z 1998.3103500761035 760-91 1850.68 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166724 H4 1998-06-23T13:13:00 ... ZEP 1998 5 1 7 46 0 1998-05-01T07:46:00Z 1998.3296537290714 131-91 1854.92 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166725 H4 1998-06-11T12:35:00 ... ZEP 1998 5 1 7 46 0 1998-05-01T07:46:00Z 1998.3296537290714 132-91 1853.41 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166726 H4 1998-06-11T12:48:00 ... ZEP 1998 5 7 8 44 0 1998-05-07T08:44:00Z 1998.346202435312 4281-91 1843.37 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166727 H4 1998-06-11T13:02:00 ... ZEP 1998 5 7 8 44 0 1998-05-07T08:44:00Z 1998.346202435312 4282-91 1845.69 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166728 H4 1998-06-11T13:16:00 ... ZEP 1998 5 14 6 38 0 1998-05-14T06:38:00Z 1998.3651407914765 1021-91 1842.11 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166729 H4 1998-07-09T10:25:00 ... ZEP 1998 5 14 6 38 0 1998-05-14T06:38:00Z 1998.3651407914765 1022-91 1841.05 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166730 H4 1998-07-09T10:39:00 ... ZEP 1998 5 21 7 30 0 1998-05-21T07:30:00Z 1998.3844178082193 4025-91 1843.04 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166731 H4 1998-07-09T10:53:00 ... ZEP 1998 5 21 7 30 0 1998-05-21T07:30:00Z 1998.3844178082193 4026-91 1845.28 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166732 H4 1998-07-09T11:06:00 ... ZEP 1998 5 28 8 25 0 1998-05-28T08:25:00Z 1998.4037005327245 815-91 1841.24 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166733 H4 1998-07-02T13:40:00 ... ZEP 1998 5 28 8 25 0 1998-05-28T08:25:00Z 1998.4037005327245 816-91 1841.34 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166734 H4 1998-07-02T13:53:00 ... ZEP 1998 6 4 7 40 0 1998-06-04T07:40:00Z 1998.422792998478 737-91 1833.71 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166735 H4 1998-07-02T14:07:00 ... ZEP 1998 6 4 7 40 0 1998-06-04T07:40:00Z 1998.422792998478 738-91 1833.79 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166736 H4 1998-07-02T14:21:00 ... ZEP 1998 6 26 7 33 0 1998-06-26T07:33:00Z 1998.483053652968 6283-66 1818.53 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166737 H4 1998-08-07T15:24:00 ... ZEP 1998 6 26 7 33 0 1998-06-26T07:33:00Z 1998.483053652968 6284-66 1818.62 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166738 H4 1998-08-07T15:37:00 ... ZEP 1998 7 3 9 30 0 1998-07-03T09:30:00Z 1998.5024543378995 6663-66 1817.51 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166739 H4 1998-08-07T15:51:00 ... ZEP 1998 7 3 9 30 0 1998-07-03T09:30:00Z 1998.5024543378995 6664-66 1817.37 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166740 H4 1998-08-07T16:05:00 ... ZEP 1998 7 10 7 50 0 1998-07-10T07:50:00Z 1998.5214421613393 1921-91 1849.94 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166741 H4 1998-08-19T14:37:00 ... ZEP 1998 7 10 7 50 0 1998-07-10T07:50:00Z 1998.5214421613393 1922-91 1849.93 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166742 H4 1998-08-19T14:51:00 ... ZEP 1998 7 17 9 35 0 1998-07-17T09:35:00Z 1998.5408200152208 1923-91 1824.76 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166743 H4 1998-08-19T15:04:00 ... ZEP 1998 7 17 9 35 0 1998-07-17T09:35:00Z 1998.5408200152208 1924-91 1824.94 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166744 H4 1998-08-19T15:18:00 ... ZEP 1998 7 24 8 5 0 1998-07-24T08:05:00Z 1998.5598268645358 1582-91 1844.88 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166745 H4 1998-09-22T16:43:00 ... ZEP 1998 7 30 8 30 0 1998-07-30T08:30:00Z 1998.5763127853882 4615-91 1834.81 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166746 H4 1998-09-22T13:56:00 ... ZEP 1998 7 30 8 30 0 1998-07-30T08:30:00Z 1998.5763127853882 4616-91 1832.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166747 H4 1998-09-22T14:10:00 ... ZEP 1998 8 7 8 30 0 1998-08-07T08:30:00Z 1998.5982305936072 105-91 1822.45 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166748 H4 1998-09-25T12:04:00 ... ZEP 1998 8 7 8 30 0 1998-08-07T08:30:00Z 1998.5982305936072 106-91 1820.77 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166749 H4 1998-09-25T12:18:00 ... ZEP 1998 8 13 8 8 0 1998-08-13T08:08:00Z 1998.6146270928464 1613-91 1828.05 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166750 H4 1998-09-28T10:11:00 ... ZEP 1998 8 13 8 8 0 1998-08-13T08:08:00Z 1998.6146270928464 1614-91 1828.54 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166751 H4 1998-09-28T10:25:00 ... ZEP 1998 8 22 14 30 0 1998-08-22T14:30:00Z 1998.6400114155251 161-91 1842.78 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166752 H4 1998-09-23T13:37:00 ... ZEP 1998 8 22 14 30 0 1998-08-22T14:30:00Z 1998.6400114155251 162-91 1841.42 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166753 H4 1998-09-23T13:50:00 ... ZEP 1998 8 23 10 25 0 1998-08-23T10:25:00Z 1998.6422850076103 1929-91 1839.88 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166754 H4 1998-09-23T14:04:00 ... ZEP 1998 8 23 10 25 0 1998-08-23T10:25:00Z 1998.6422850076103 1930-91 1840.59 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166755 H4 1998-09-23T14:18:00 ... ZEP 1998 8 27 8 13 0 1998-08-27T08:13:00Z 1998.6529927701674 1589-91 1870.92 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166756 H4 1998-10-14T13:25:00 ... ZEP 1998 8 27 8 13 0 1998-08-27T08:13:00Z 1998.6529927701674 1590-91 1869.53 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166757 H4 1998-10-14T13:39:00 ... ZEP 1998 9 3 8 2 0 1998-09-03T08:02:00Z 1998.6721499238965 4695-91 1836.12 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166758 H4 1998-10-14T12:58:00 ... ZEP 1998 9 3 8 2 0 1998-09-03T08:02:00Z 1998.6721499238965 4696-91 1836.32 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166759 H4 1998-10-14T13:11:00 ... ZEP 1998 9 24 8 12 0 1998-09-24T08:12:00Z 1998.7297031963471 36-98 1862.24 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166760 H4 1998-11-17T12:38:00 ... ZEP 1998 9 24 8 12 0 1998-09-24T08:12:00Z 1998.7297031963471 37-98 1861.96 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166761 H4 1998-11-17T12:51:00 ... ZEP 1998 10 2 11 23 0 1998-10-02T11:23:00Z 1998.7519843987823 4657-91 1848.15 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166762 H4 1998-11-12T16:18:00 ... ZEP 1998 10 2 11 23 0 1998-10-02T11:23:00Z 1998.7519843987823 4658-91 1848.43 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166763 H4 1998-11-12T16:32:00 ... ZEP 1998 10 8 8 18 0 1998-10-08T08:18:00Z 1998.7680707762556 255-91 1863.34 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166764 H4 1998-11-12T14:56:00 ... ZEP 1998 10 8 8 18 0 1998-10-08T08:18:00Z 1998.7680707762556 256-91 1864.28 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166765 H4 1998-11-12T15:10:00 ... ZEP 1998 10 16 8 45 0 1998-10-16T08:45:00Z 1998.790039954338 6183-66 1883.97 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166766 H4 1998-12-01T10:56:00 ... ZEP 1998 10 16 8 45 0 1998-10-16T08:45:00Z 1998.790039954338 6184-66 1881.63 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166767 H4 1998-12-01T11:09:00 ... ZEP 1998 10 22 9 30 0 1998-10-22T09:30:00Z 1998.8065639269407 6043-66 1865.07 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166768 H4 1998-12-01T11:23:00 ... ZEP 1998 10 22 9 30 0 1998-10-22T09:30:00Z 1998.8065639269407 6044-66 1863.91 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166769 H4 1998-12-01T11:37:00 ... ZEP 1998 10 30 10 7 0 1998-10-30T10:07:00Z 1998.828552130898 793-91 1866.19 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166770 H4 1998-12-04T11:58:00 ... ZEP 1998 10 30 10 7 0 1998-10-30T10:07:00Z 1998.828552130898 794-91 1863.31 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166771 H4 1998-12-04T12:12:00 ... ZEP 1998 11 5 8 45 0 1998-11-05T08:45:00Z 1998.8448344748858 800-91 1864.92 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166772 H4 1998-12-04T15:04:00 ... ZEP 1998 11 20 9 15 0 1998-11-20T09:15:00Z 1998.8859874429224 835-91 1869.29 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166773 H4 1999-01-05T10:53:00 ... ZEP 1998 11 20 9 15 0 1998-11-20T09:15:00Z 1998.8859874429224 836-91 1868.07 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166774 H4 1999-01-05T11:07:00 ... ZEP 1998 11 26 8 45 0 1998-11-26T08:45:00Z 1998.9023687214612 1359-91 1846.4 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166775 H4 1999-01-05T09:30:00 ... ZEP 1998 11 26 8 45 0 1998-11-26T08:45:00Z 1998.9023687214612 1360-91 1841.0 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166776 H4 1999-01-05T09:44:00 ... ZEP 1998 12 4 10 15 0 1998-12-04T10:15:00Z 1998.924457762557 4593-91 1855.15 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166777 H4 1999-01-15T14:52:00 ... ZEP 1998 12 4 10 15 0 1998-12-04T10:15:00Z 1998.924457762557 4594-91 1853.25 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166778 H4 1999-01-15T15:06:00 ... ZEP 1998 12 11 9 5 0 1998-12-11T09:05:00Z 1998.9435026636224 1589-91 1787.9 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166779 H4 1999-01-15T15:19:00 C.. ZEP 1998 12 11 9 5 0 1998-12-11T09:05:00Z 1998.9435026636224 1590-91 1455.61 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166780 H4 1999-01-15T15:33:00 C.. ZEP 1998 12 18 9 50 0 1998-12-18T09:50:00Z 1998.9627663622528 79-91 1869.74 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166781 H4 1999-02-16T09:46:00 ... ZEP 1998 12 18 9 50 0 1998-12-18T09:50:00Z 1998.9627663622528 80-91 1868.25 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166782 H4 1999-02-16T10:00:00 ... ZEP 1998 12 31 8 47 0 1998-12-31T08:47:00Z 1998.9982629375952 1807-91 1885.85 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166783 H4 1999-02-16T10:13:00 C.. ZEP 1998 12 31 8 47 0 1998-12-31T08:47:00Z 1998.9982629375952 1808-91 1874.71 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166784 H4 1999-02-16T10:27:00 C.. ZEP 1999 1 7 13 20 0 1999-01-07T13:20:00Z 1999.0179604261796 653-91 1870.39 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166785 H4 1999-02-12T14:54:00 ... ZEP 1999 1 7 13 20 0 1999-01-07T13:20:00Z 1999.0179604261796 654-91 1871.46 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166786 H4 1999-02-12T15:07:00 ... ZEP 1999 1 9 15 0 0 1999-01-09T15:00:00Z 1999.0236301369864 97-91 1872.4 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166787 H4 1999-02-16T09:19:00 ... ZEP 1999 1 9 15 0 0 1999-01-09T15:00:00Z 1999.0236301369864 98-91 1872.6 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166788 H4 1999-02-16T09:32:00 ... ZEP 1999 1 14 9 0 0 1999-01-14T09:00:00Z 1999.0366438356164 1290-91 1849.05 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166790 H4 1999-02-19T12:15:00 ... ZEP 1999 1 14 9 0 0 1999-01-14T09:00:00Z 1999.0366438356164 469-91 1849.35 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166789 H4 1999-02-19T12:28:00 ... ZEP 1999 1 21 9 16 0 1999-01-21T09:16:00Z 1999.0558523592085 1289-91 1876.31 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166792 H4 1999-02-19T13:52:00 ... ZEP 1999 1 21 9 16 0 1999-01-21T09:16:00Z 1999.0558523592085 470-91 1856.57 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166791 H4 1999-02-19T13:38:00 C.. ZEP 1999 1 29 9 8 0 1999-01-29T09:08:00Z 1999.0777549467275 1007-91 1834.67 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166793 H4 1999-03-25T10:03:00 C.. ZEP 1999 1 29 9 8 0 1999-01-29T09:08:00Z 1999.0777549467275 1008-91 1590.24 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166794 H4 1999-03-25T10:16:00 C.. ZEP 1999 2 6 9 0 0 1999-02-06T09:00:00Z 1999.0996575342465 1131-91 1856.75 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166795 H4 1999-03-24T09:27:00 ... ZEP 1999 2 6 9 0 0 1999-02-06T09:00:00Z 1999.0996575342465 1132-91 1856.49 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166796 H4 1999-03-24T09:41:00 ... ZEP 1999 2 11 9 0 0 1999-02-11T09:00:00Z 1999.1133561643835 4755-91 1894.43 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166797 H4 1999-03-30T15:01:00 ... ZEP 1999 2 11 9 0 0 1999-02-11T09:00:00Z 1999.1133561643835 4756-91 1892.6 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166798 H4 1999-03-30T15:15:00 ... ZEP 1999 2 18 9 5 0 1999-02-18T09:05:00Z 1999.1325437595128 1085-91 1877.25 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166799 H4 1999-03-30T15:28:00 ... ZEP 1999 2 18 9 5 0 1999-02-18T09:05:00Z 1999.1325437595128 1086-91 1873.83 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166800 H4 1999-03-30T15:42:00 ... ZEP 1999 2 25 8 55 0 1999-02-25T08:55:00Z 1999.1517028158296 655-91 1870.6 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166801 H4 1999-04-23T14:02:00 ... ZEP 1999 2 25 8 55 0 1999-02-25T08:55:00Z 1999.1517028158296 656-91 1870.29 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166802 H4 1999-04-23T14:15:00 ... ZEP 1999 3 4 9 18 0 1999-03-04T09:18:00Z 1999.1709246575342 357-91 1842.44 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166803 H4 1999-04-23T13:34:00 C.. ZEP 1999 3 4 9 18 0 1999-03-04T09:18:00Z 1999.1709246575342 358-91 1734.18 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166804 H4 1999-04-23T13:48:00 C.. ZEP 1999 3 11 8 55 0 1999-03-11T08:55:00Z 1999.190058980213 302-91 1858.93 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166805 H4 1999-04-28T15:06:00 ... ZEP 1999 3 25 9 0 0 1999-03-25T09:00:00Z 1999.2284246575343 2079-91 1841.4 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166806 H4 1999-04-28T15:20:00 C.. ZEP 1999 3 25 9 0 0 1999-03-25T09:00:00Z 1999.2284246575343 2080-91 1767.65 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166807 H4 1999-04-28T15:33:00 C.. ZEP 1999 4 2 8 5 0 1999-04-02T08:05:00Z 1999.2502378234399 1981-91 1868.04 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166808 H4 1999-06-29T11:25:00 ... ZEP 1999 4 2 8 5 0 1999-04-02T08:05:00Z 1999.2502378234399 1982-91 1869.02 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166809 H4 1999-06-29T11:39:00 ... ZEP 1999 4 9 8 10 0 1999-04-09T08:10:00Z 1999.2694254185692 1309-91 1890.8 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166810 H4 1999-06-29T12:20:00 ... ZEP 1999 4 9 8 10 0 1999-04-09T08:10:00Z 1999.2694254185692 1310-91 1889.74 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166811 H4 1999-06-29T12:33:00 ... ZEP 1999 4 15 8 35 0 1999-04-15T08:35:00Z 1999.2859113394215 1939-91 1879.36 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166812 H4 1999-06-10T13:36:00 ... ZEP 1999 4 15 8 35 0 1999-04-15T08:35:00Z 1999.2859113394215 1940-91 1878.09 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166813 H4 1999-06-10T13:49:00 ... ZEP 1999 4 22 8 45 0 1999-04-22T08:45:00Z 1999.3051084474887 1125-91 1862.26 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166814 H4 1999-06-10T14:03:00 ... ZEP 1999 4 22 8 45 0 1999-04-22T08:45:00Z 1999.3051084474887 1126-91 1859.22 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166815 H4 1999-06-10T14:17:00 ... ZEP 1999 5 1 8 53 0 1999-05-01T08:53:00Z 1999.3297812024352 4339-91 1867.23 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166816 H4 1999-07-23T12:22:00 ... ZEP 1999 5 1 8 53 0 1999-05-01T08:53:00Z 1999.3297812024352 4340-91 1866.25 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166817 H4 1999-07-23T12:36:00 ... ZEP 1999 5 6 8 32 0 1999-05-06T08:32:00Z 1999.3434398782344 287-91 1860.4 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166818 H4 1999-07-23T11:55:00 ... ZEP 1999 5 6 8 32 0 1999-05-06T08:32:00Z 1999.3434398782344 288-91 1856.04 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166819 H4 1999-07-23T12:09:00 ... ZEP 1999 5 14 9 0 0 1999-05-14T09:00:00Z 1999.365410958904 4689-91 1768.31 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166820 H4 1999-08-11T12:49:00 C.. ZEP 1999 5 14 9 0 0 1999-05-14T09:00:00Z 1999.365410958904 4690-91 1845.95 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166821 H4 1999-08-11T13:03:00 C.. ZEP 1999 5 21 8 58 0 1999-05-21T08:58:00Z 1999.384585235921 563-91 1855.02 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166822 H4 1999-08-11T13:44:00 ... ZEP 1999 5 21 8 58 0 1999-05-21T08:58:00Z 1999.384585235921 564-91 1854.99 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166823 H4 1999-08-11T13:57:00 ... ZEP 1999 5 27 8 50 0 1999-05-27T08:50:00Z 1999.4010083713852 4537-91 1677.93 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166824 H4 1999-08-12T09:32:00 C.. ZEP 1999 5 27 8 50 0 1999-05-27T08:50:00Z 1999.4010083713852 4538-91 1830.01 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166825 H4 1999-08-12T09:46:00 C.. ZEP 1999 6 7 8 40 0 1999-06-07T08:40:00Z 1999.4311263318114 1557-91 1838.12 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166826 H4 1999-08-12T12:18:00 C.. ZEP 1999 6 7 8 40 0 1999-06-07T08:40:00Z 1999.4311263318114 1558-91 1776.57 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166827 H4 1999-08-12T12:32:00 C.. ZEP 1999 6 11 9 30 0 1999-06-11T09:30:00Z 1999.4421803652967 427-91 1833.28 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166828 H4 1999-08-12T11:23:00 C.. ZEP 1999 6 11 9 30 0 1999-06-11T09:30:00Z 1999.4421803652967 428-91 1773.85 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166829 H4 1999-08-12T11:37:00 C.. ZEP 1999 6 17 8 30 0 1999-06-17T08:30:00Z 1999.45850456621 4345-91 1829.88 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166830 H4 1999-08-12T11:51:00 C.. ZEP 1999 6 17 8 30 0 1999-06-17T08:30:00Z 1999.45850456621 4346-91 -999.99 -999.999 78.9067 11.8883 479.0 474.0 5.0 P 166831 H4 1999-08-12T12:04:00 M.. ZEP 1999 7 15 9 45 0 1999-07-15T09:45:00Z 1999.535359589041 2041-91 2010.04 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166832 H4 1999-09-07T15:20:00 C.. ZEP 1999 7 15 9 45 0 1999-07-15T09:45:00Z 1999.535359589041 2042-91 1832.56 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166833 H4 1999-09-07T15:34:00 ... ZEP 1999 7 22 9 15 0 1999-07-22T09:15:00Z 1999.5544805936072 2045-91 1822.73 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166834 H4 1999-09-07T14:53:00 ... ZEP 1999 7 22 9 15 0 1999-07-22T09:15:00Z 1999.5544805936072 2046-91 1824.41 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166835 H4 1999-09-07T15:06:00 ... ZEP 1999 7 26 9 30 0 1999-07-26T09:30:00Z 1999.5654680365296 789-91 1831.13 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166836 H4 1999-09-07T13:56:00 ... ZEP 1999 7 26 9 30 0 1999-07-26T09:30:00Z 1999.5654680365296 790-91 1835.32 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166837 H4 1999-09-07T14:09:00 ... ZEP 1999 7 29 9 0 0 1999-07-29T09:00:00Z 1999.5736301369864 1851-91 1836.49 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166838 H4 1999-09-01T15:13:00 ... ZEP 1999 7 29 9 0 0 1999-07-29T09:00:00Z 1999.5736301369864 1852-91 1838.18 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166839 H4 1999-09-01T15:27:00 ... ZEP 1999 8 2 8 55 0 1999-08-02T08:55:00Z 1999.5845795281582 785-91 1835.97 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166840 H4 1999-09-07T12:34:00 ... ZEP 1999 8 2 8 55 0 1999-08-02T08:55:00Z 1999.5845795281582 786-91 1835.22 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166841 H4 1999-09-07T12:47:00 ... ZEP 1999 8 5 12 34 56 1999-08-05T12:34:56Z 1999.5932171486554 1695-91 1841.23 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166842 H4 1999-09-01T14:46:00 ... ZEP 1999 8 5 12 34 56 1999-08-05T12:34:56Z 1999.5932171486554 1696-91 1840.6 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166843 H4 1999-09-01T15:00:00 ... ZEP 1999 8 9 13 40 0 1999-08-09T13:40:00Z 1999.604299847793 795-91 1822.93 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166844 H4 1999-10-22T12:35:00 ... ZEP 1999 8 9 13 40 0 1999-08-09T13:40:00Z 1999.604299847793 796-91 1824.62 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166845 H4 1999-10-22T12:48:00 ... ZEP 1999 8 12 9 0 0 1999-08-12T09:00:00Z 1999.6119863013698 1267-91 1830.85 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166846 H4 1999-10-21T12:42:00 ... ZEP 1999 8 12 9 0 0 1999-08-12T09:00:00Z 1999.6119863013698 1268-91 1833.33 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166847 H4 1999-10-21T12:56:00 ... ZEP 1999 8 20 8 55 0 1999-08-20T08:55:00Z 1999.6338945966515 809-91 1827.13 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166848 H4 1999-10-22T12:07:00 ... ZEP 1999 8 20 8 55 0 1999-08-20T08:55:00Z 1999.6338945966515 810-91 1826.59 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166849 H4 1999-10-22T12:21:00 ... ZEP 1999 8 23 13 18 0 1999-08-23T13:18:00Z 1999.642614155251 739-91 1823.08 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166850 H4 1999-11-03T14:50:00 ... ZEP 1999 8 23 13 18 0 1999-08-23T13:18:00Z 1999.642614155251 740-91 1823.22 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166851 H4 1999-11-03T15:03:00 ... ZEP 1999 8 26 6 50 0 1999-08-26T06:50:00Z 1999.650095129376 679-91 1819.06 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166852 H4 1999-10-21T12:15:00 ... ZEP 1999 8 26 6 50 0 1999-08-26T06:50:00Z 1999.650095129376 680-91 1819.18 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166853 H4 1999-10-21T12:28:00 ... ZEP 1999 8 30 8 10 0 1999-08-30T08:10:00Z 1999.661206240487 811-91 1825.42 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166854 H4 1999-11-03T15:17:00 ... ZEP 1999 8 30 8 10 0 1999-08-30T08:10:00Z 1999.661206240487 812-91 1826.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166855 H4 1999-11-03T15:31:00 ... ZEP 1999 9 2 8 30 0 1999-09-02T08:30:00Z 1999.6694634703197 4053-91 1573.82 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166856 H4 1999-10-21T10:49:00 C.. ZEP 1999 9 2 8 30 0 1999-09-02T08:30:00Z 1999.6694634703197 4054-91 1075.76 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166857 H4 1999-10-21T11:03:00 C.. ZEP 1999 9 6 8 15 0 1999-09-06T08:15:00Z 1999.6803938356165 791-91 1850.29 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166858 H4 1999-10-22T11:36:00 ... ZEP 1999 9 6 8 15 0 1999-09-06T08:15:00Z 1999.6803938356165 792-91 1849.6 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166859 H4 1999-10-22T11:49:00 ... ZEP 1999 9 9 9 0 0 1999-09-09T09:00:00Z 1999.688698630137 157-98 1852.99 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166860 H4 1999-10-21T11:44:00 ... ZEP 1999 9 9 9 0 0 1999-09-09T09:00:00Z 1999.688698630137 158-98 1838.02 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166861 H4 1999-10-21T11:57:00 C.. ZEP 1999 9 13 7 15 0 1999-09-13T07:15:00Z 1999.6994577625571 747-91 1835.14 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166862 H4 1999-10-22T13:02:00 ... ZEP 1999 9 13 7 15 0 1999-09-13T07:15:00Z 1999.6994577625571 748-91 1835.01 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166863 H4 1999-10-22T13:16:00 ... ZEP 1999 9 16 8 47 0 1999-09-16T08:47:00Z 1999.707851978691 1419-91 1813.06 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166864 H4 1999-11-30T14:27:00 C.. ZEP 1999 9 16 8 47 0 1999-09-16T08:47:00Z 1999.707851978691 1420-91 1676.72 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166865 H4 1999-11-30T14:40:00 C.. ZEP 1999 9 20 9 0 0 1999-09-20T09:00:00Z 1999.7188356164384 4443-91 1630.83 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166866 H4 1999-12-01T11:49:00 C.. ZEP 1999 9 20 9 0 0 1999-09-20T09:00:00Z 1999.7188356164384 4444-91 1803.99 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166867 H4 1999-12-01T12:03:00 C.. ZEP 1999 9 23 11 20 0 1999-09-23T11:20:00Z 1999.7273211567733 4681-91 1840.33 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166868 H4 1999-11-30T13:58:00 ... ZEP 1999 9 23 11 20 0 1999-09-23T11:20:00Z 1999.7273211567733 4682-91 1840.77 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166869 H4 1999-11-30T14:11:00 ... ZEP 1999 9 27 8 45 0 1999-09-27T08:45:00Z 1999.7379851598173 693-91 1833.61 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166870 H4 1999-12-01T13:11:00 ... ZEP 1999 9 27 8 45 0 1999-09-27T08:45:00Z 1999.7379851598173 694-91 1835.21 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166871 H4 1999-12-01T13:24:00 ... ZEP 1999 9 30 9 3 0 1999-09-30T09:03:00Z 1999.746238584475 4201-91 1825.36 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166872 H4 1999-12-01T12:16:00 C.. ZEP 1999 9 30 9 3 0 1999-09-30T09:03:00Z 1999.746238584475 4202-91 1766.0 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166873 H4 1999-12-01T12:30:00 C.. ZEP 1999 10 4 9 20 0 1999-10-04T09:20:00Z 1999.7572298325722 813-91 1846.57 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166874 H4 1999-11-18T11:44:00 ... ZEP 1999 10 4 9 20 0 1999-10-04T09:20:00Z 1999.7572298325722 814-91 1847.35 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166875 H4 1999-11-18T11:58:00 ... ZEP 1999 10 7 8 45 0 1999-10-07T08:45:00Z 1999.7653824200913 1611-91 1848.55 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166876 H4 1999-12-01T12:44:00 ... ZEP 1999 10 7 8 45 0 1999-10-07T08:45:00Z 1999.7653824200913 1612-91 1838.11 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166877 H4 1999-12-01T12:57:00 C.. ZEP 1999 10 11 9 0 0 1999-10-11T09:00:00Z 1999.7763698630138 733-91 1781.82 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166878 H4 1999-11-15T14:39:00 C.. ZEP 1999 10 11 9 0 0 1999-10-11T09:00:00Z 1999.7763698630138 734-91 1837.63 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166879 H4 1999-11-15T14:53:00 C.. ZEP 1999 10 14 9 20 0 1999-10-14T09:20:00Z 1999.7846270928462 535-91 1846.3 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166880 H4 1999-11-23T15:53:00 ... ZEP 1999 10 14 9 20 0 1999-10-14T09:20:00Z 1999.7846270928462 536-91 1846.23 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166881 H4 1999-11-23T16:07:00 ... ZEP 1999 10 18 8 55 0 1999-10-18T08:55:00Z 1999.795538432268 11-91 1840.5 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166882 H4 1999-11-30T13:31:00 ... ZEP 1999 10 18 8 55 0 1999-10-18T08:55:00Z 1999.795538432268 12-91 1839.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166883 H4 1999-11-30T13:44:00 ... ZEP 1999 10 21 8 45 0 1999-10-21T08:45:00Z 1999.8037385844748 1477-91 1837.38 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166884 H4 1999-11-23T16:20:00 ... ZEP 1999 10 21 8 45 0 1999-10-21T08:45:00Z 1999.8037385844748 1478-91 1815.98 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166885 H4 1999-11-23T16:34:00 C.. ZEP 1999 10 25 9 15 0 1999-10-25T09:15:00Z 1999.81475456621 1207-91 1849.27 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166886 H4 1999-11-30T13:03:00 ... ZEP 1999 10 25 9 15 0 1999-10-25T09:15:00Z 1999.81475456621 1208-91 1848.76 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166887 H4 1999-11-30T13:17:00 ... ZEP 1999 10 28 8 55 0 1999-10-28T08:55:00Z 1999.822935692542 1151-91 1850.28 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166888 H4 1999-11-24T10:34:00 ... ZEP 1999 10 28 8 55 0 1999-10-28T08:55:00Z 1999.822935692542 1152-91 1839.8 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166889 H4 1999-11-24T10:47:00 C.. ZEP 1999 11 4 9 55 0 1999-11-04T09:55:00Z 1999.8422279299848 5-98 1858.41 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166890 H4 1999-11-24T10:05:00 ... ZEP 1999 11 4 9 55 0 1999-11-04T09:55:00Z 1999.8422279299848 6-98 1858.71 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166891 H4 1999-11-24T10:18:00 ... ZEP 1999 11 8 9 25 0 1999-11-08T09:25:00Z 1999.853129756469 4149-91 1854.1 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166892 H4 1999-12-27T14:46:00 ... ZEP 1999 11 8 9 25 0 1999-11-08T09:25:00Z 1999.853129756469 4150-91 1854.64 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166893 H4 1999-12-27T15:00:00 ... ZEP 1999 11 11 10 28 0 1999-11-11T10:28:00Z 1999.8614687975646 4505-91 1855.51 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166894 H4 1999-12-27T16:37:00 ... ZEP 1999 11 11 10 28 0 1999-11-11T10:28:00Z 1999.8614687975646 4506-91 1856.57 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166895 H4 1999-12-27T16:50:00 ... ZEP 1999 11 15 9 15 0 1999-11-15T09:15:00Z 1999.8722888127854 805-91 1844.76 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166896 H4 1999-12-22T10:00:00 ... ZEP 1999 11 15 9 15 0 1999-11-15T09:15:00Z 1999.8722888127854 806-91 1844.78 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166897 H4 1999-12-22T10:14:00 ... ZEP 1999 11 18 9 1 0 1999-11-18T09:01:00Z 1999.8804813546424 1423-91 1849.24 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166898 H4 1999-12-28T09:36:00 ... ZEP 1999 11 18 9 1 0 1999-11-18T09:01:00Z 1999.8804813546424 1424-91 1835.43 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166899 H4 1999-12-28T09:49:00 C.. ZEP 1999 11 25 10 50 0 1999-11-25T10:50:00Z 1999.8998668188738 1963-91 1865.9 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166900 H4 2000-01-21T10:02:00 ... ZEP 1999 11 25 10 50 0 1999-11-25T10:50:00Z 1999.8998668188738 1964-91 1866.0 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166901 H4 2000-01-21T10:16:00 ... ZEP 1999 11 29 9 30 0 1999-11-29T09:30:00Z 1999.9106735159817 783-91 1875.82 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166902 H4 1999-12-22T11:24:00 ... ZEP 1999 11 29 9 30 0 1999-11-29T09:30:00Z 1999.9106735159817 784-91 1874.4 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166903 H4 1999-12-22T11:37:00 ... ZEP 1999 12 2 9 20 0 1999-12-02T09:20:00Z 1999.9188736681888 4413-91 1876.79 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166904 H4 2000-01-19T12:51:00 ... ZEP 1999 12 2 9 20 0 1999-12-02T09:20:00Z 1999.9188736681888 4414-91 1874.75 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166905 H4 2000-01-19T13:04:00 ... ZEP 1999 12 6 9 33 0 1999-12-06T09:33:00Z 1999.9298573059361 735-91 1883.98 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166906 H4 2000-01-28T11:48:00 ... ZEP 1999 12 6 9 33 0 1999-12-06T09:33:00Z 1999.9298573059361 736-91 1884.85 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166907 H4 2000-01-28T12:02:00 ... ZEP 1999 12 9 9 5 0 1999-12-09T09:05:00Z 1999.9380232115677 1027-91 1875.79 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166908 H4 2000-01-19T12:23:00 ... ZEP 1999 12 9 9 5 0 1999-12-09T09:05:00Z 1999.9380232115677 1028-91 1878.63 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166909 H4 2000-01-19T12:37:00 ... ZEP 1999 12 13 9 5 0 1999-12-13T09:05:00Z 1999.9489821156774 737-91 1859.73 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166910 H4 2000-01-28T14:06:00 ... ZEP 1999 12 13 9 5 0 1999-12-13T09:05:00Z 1999.9489821156774 738-91 1860.62 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166911 H4 2000-01-28T14:20:00 ... ZEP 1999 12 16 9 43 0 1999-12-16T09:43:00Z 1999.9572735920851 235-91 1876.21 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166912 H4 2000-01-20T15:21:00 ... ZEP 1999 12 16 9 43 0 1999-12-16T09:43:00Z 1999.9572735920851 236-91 1876.1 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166913 H4 2000-01-20T15:34:00 ... ZEP 1999 12 20 9 55 0 1999-12-20T09:55:00Z 1999.968255327245 815-91 1889.97 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166914 H4 2000-01-28T14:34:00 ... ZEP 1999 12 20 9 55 0 1999-12-20T09:55:00Z 1999.968255327245 816-91 1889.73 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166915 H4 2000-01-28T14:47:00 ... ZEP 1999 12 23 10 20 0 1999-12-23T10:20:00Z 1999.976522070015 1195-91 1864.65 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166916 H4 2000-01-26T11:51:00 ... ZEP 1999 12 23 10 20 0 1999-12-23T10:20:00Z 1999.976522070015 1196-91 1868.63 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166917 H4 2000-01-26T12:04:00 ... ZEP 1999 12 27 10 10 0 1999-12-27T10:10:00Z 1999.9874619482496 787-91 1881.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166918 H4 2000-01-28T12:16:00 ... ZEP 1999 12 27 10 10 0 1999-12-27T10:10:00Z 1999.9874619482496 788-91 1882.63 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166919 H4 2000-01-28T12:29:00 ... ZEP 1999 12 30 9 20 0 1999-12-30T09:20:00Z 1999.995585996956 4035-91 1889.61 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166920 H4 2000-01-26T11:24:00 ... ZEP 1999 12 30 9 20 0 1999-12-30T09:20:00Z 1999.995585996956 4036-91 1887.78 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166921 H4 2000-01-26T11:37:00 ... ZEP 2000 1 3 9 0 0 2000-01-03T09:00:00Z 2000.0064890710382 799-91 1897.45 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166922 H4 2000-02-04T14:55:00 ... ZEP 2000 1 3 9 0 0 2000-01-03T09:00:00Z 2000.0064890710382 800-91 1896.89 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166923 H4 2000-02-04T15:09:00 ... ZEP 2000 1 6 9 20 0 2000-01-06T09:20:00Z 2000.0147237401336 253-91 1916.58 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166924 H4 2000-01-31T16:06:00 .S. ZEP 2000 1 6 9 20 0 2000-01-06T09:20:00Z 2000.0147237401336 254-91 1917.02 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166925 H4 2000-01-31T16:20:00 .S. ZEP 2000 1 10 9 20 0 2000-01-10T09:20:00Z 2000.025652701882 781-91 1875.0 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166926 H4 2000-02-04T14:26:00 ... ZEP 2000 1 10 9 20 0 2000-01-10T09:20:00Z 2000.025652701882 782-91 1874.85 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166927 H4 2000-02-04T14:40:00 ... ZEP 2000 1 14 9 47 0 2000-01-14T09:47:00Z 2000.036632893139 1383-91 1871.67 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166928 H4 2000-01-31T15:10:00 ... ZEP 2000 1 14 9 47 0 2000-01-14T09:47:00Z 2000.036632893139 1384-91 1871.29 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166929 H4 2000-01-31T15:24:00 ... ZEP 2000 1 17 10 35 0 2000-01-17T10:35:00Z 2000.0449206891317 745-91 1859.1 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166930 H4 2000-02-16T12:28:00 ... ZEP 2000 1 17 10 35 0 2000-01-17T10:35:00Z 2000.0449206891317 746-91 1858.9 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166931 H4 2000-02-16T12:42:00 ... ZEP 2000 1 20 9 0 0 2000-01-20T09:00:00Z 2000.05293715847 1379-91 1870.53 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166932 H4 2000-02-16T11:06:00 ... ZEP 2000 1 20 9 0 0 2000-01-20T09:00:00Z 2000.05293715847 1380-91 1868.04 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166933 H4 2000-02-16T11:20:00 ... ZEP 2000 1 24 9 0 0 2000-01-24T09:00:00Z 2000.0638661202186 793-91 1860.95 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166934 H4 2000-02-16T12:57:00 ... ZEP 2000 1 24 9 0 0 2000-01-24T09:00:00Z 2000.0638661202186 794-91 1861.66 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166935 H4 2000-02-16T13:11:00 ... ZEP 2000 1 27 9 25 0 2000-01-27T09:25:00Z 2000.0721102762598 1329-91 1876.84 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166936 H4 2000-02-16T10:20:00 ... ZEP 2000 1 27 9 25 0 2000-01-27T09:25:00Z 2000.0721102762598 1330-91 1876.85 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166937 H4 2000-02-16T10:33:00 ... ZEP 2000 1 31 9 40 0 2000-01-31T09:40:00Z 2000.0830676988464 785-91 1873.97 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166938 H4 2000-02-25T14:34:00 ... ZEP 2000 1 31 9 40 0 2000-01-31T09:40:00Z 2000.0830676988464 786-91 1876.32 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166939 H4 2000-02-25T14:47:00 ... ZEP 2000 2 3 9 25 0 2000-02-03T09:25:00Z 2000.0912359593199 4085-91 1881.05 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166940 H4 2000-03-02T12:29:00 ... ZEP 2000 2 7 15 30 0 2000-02-07T15:30:00Z 2000.1028574681238 789-91 1861.65 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166941 H4 2000-02-25T15:56:00 ... ZEP 2000 2 7 15 30 0 2000-02-07T15:30:00Z 2000.1028574681238 790-91 1858.83 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166942 H4 2000-02-25T16:09:00 ... ZEP 2000 2 10 8 45 0 2000-02-10T08:45:00Z 2000.1102857468125 69-98 1872.38 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166943 H4 2000-03-02T11:03:00 ... ZEP 2000 2 10 8 45 0 2000-02-10T08:45:00Z 2000.1102857468125 70-98 1869.52 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166944 H4 2000-03-02T11:16:00 ... ZEP 2000 2 14 10 30 0 2000-02-14T10:30:00Z 2000.1214139344263 813-91 1886.62 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166945 H4 2000-03-31T10:46:00 ... ZEP 2000 2 14 10 30 0 2000-02-14T10:30:00Z 2000.1214139344263 814-91 1886.68 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166946 H4 2000-03-31T10:59:00 ... ZEP 2000 2 18 9 34 0 2000-02-18T09:34:00Z 2000.1322366423801 795-91 1869.83 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166947 H4 2000-03-31T12:05:00 ... ZEP 2000 2 18 9 34 0 2000-02-18T09:34:00Z 2000.1322366423801 796-91 1872.33 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166948 H4 2000-03-31T12:18:00 ... ZEP 2000 2 21 9 30 0 2000-02-21T09:30:00Z 2000.1404257741349 733-91 1867.03 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166949 H4 2000-03-31T13:51:00 ... ZEP 2000 2 21 9 30 0 2000-02-21T09:30:00Z 2000.1404257741349 734-91 1866.72 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166950 H4 2000-03-31T14:04:00 ... ZEP 2000 2 24 9 45 0 2000-02-24T09:45:00Z 2000.1486509562842 77-98 1865.88 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166951 H4 2000-03-31T14:45:00 ... ZEP 2000 2 24 9 45 0 2000-02-24T09:45:00Z 2000.1486509562842 78-98 1868.5 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166952 H4 2000-03-31T14:58:00 ... ZEP 2000 2 28 10 55 0 2000-02-28T10:55:00Z 2000.1597127352763 739-91 1857.92 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166953 H4 2000-03-31T12:32:00 ... ZEP 2000 2 28 10 55 0 2000-02-28T10:55:00Z 2000.1597127352763 740-91 1856.67 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166954 H4 2000-03-31T12:45:00 ... ZEP 2000 3 2 9 30 0 2000-03-02T09:30:00Z 2000.1677481785064 1403-91 1875.89 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166955 H4 2000-03-31T14:19:00 ... ZEP 2000 3 2 9 30 0 2000-03-02T09:30:00Z 2000.1677481785064 1404-91 1876.79 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166956 H4 2000-03-31T14:32:00 ... ZEP 2000 3 6 10 20 0 2000-03-06T10:20:00Z 2000.1787720097145 747-91 1932.07 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166957 H4 2000-04-07T12:19:00 .S. ZEP 2000 3 6 10 20 0 2000-03-06T10:20:00Z 2000.1787720097145 748-91 1931.74 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166958 H4 2000-04-07T12:32:00 .S. ZEP 2000 3 10 13 50 0 2000-03-10T13:50:00Z 2000.1900994231937 1171-91 1849.91 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166959 H4 2000-04-10T12:31:00 ... ZEP 2000 3 10 13 50 0 2000-03-10T13:50:00Z 2000.1900994231937 1172-91 1852.19 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166960 H4 2000-04-10T12:44:00 ... ZEP 2000 3 15 18 0 0 2000-03-15T18:00:00Z 2000.2042349726776 811-91 1887.02 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166961 H4 2000-04-07T11:53:00 ... ZEP 2000 3 15 18 0 0 2000-03-15T18:00:00Z 2000.2042349726776 812-91 1886.46 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166962 H4 2000-04-07T12:06:00 ... ZEP 2000 3 16 10 30 0 2000-03-16T10:30:00Z 2000.2061133879781 4741-91 1872.88 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166963 H4 2000-04-10T12:57:00 ... ZEP 2000 3 16 10 30 0 2000-03-16T10:30:00Z 2000.2061133879781 4742-91 1873.37 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166964 H4 2000-04-10T13:10:00 ... ZEP 2000 3 20 10 15 0 2000-03-20T10:15:00Z 2000.217013888889 149-91 1855.85 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166965 H4 2000-04-25T09:24:00 ... ZEP 2000 3 20 10 15 0 2000-03-20T10:15:00Z 2000.217013888889 150-91 1853.27 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166966 H4 2000-04-25T09:37:00 ... ZEP 2000 3 23 10 20 0 2000-03-23T10:20:00Z 2000.2252200971463 591-91 1886.28 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166967 H4 2000-04-25T11:39:00 ... ZEP 2000 3 23 10 20 0 2000-03-23T10:20:00Z 2000.2252200971463 592-91 1887.89 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166968 H4 2000-04-25T11:52:00 ... ZEP 2000 3 27 9 40 0 2000-03-27T09:40:00Z 2000.2360731633273 2019-91 1866.38 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166969 H4 2000-04-25T10:16:00 ... ZEP 2000 3 27 9 40 0 2000-03-27T09:40:00Z 2000.2360731633273 2020-91 1865.35 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166970 H4 2000-04-25T10:29:00 ... ZEP 2000 3 30 8 55 0 2000-03-30T08:55:00Z 2000.244184502125 137-98 1865.87 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166971 H4 2000-04-25T12:05:00 ... ZEP 2000 3 30 8 55 0 2000-03-30T08:55:00Z 2000.244184502125 138-98 1864.69 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166972 H4 2000-04-25T12:18:00 ... ZEP 2000 4 3 9 10 0 2000-04-03T09:10:00Z 2000.2551419247116 805-91 1854.59 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166973 H4 2000-05-11T10:44:00 ... ZEP 2000 4 3 9 10 0 2000-04-03T09:10:00Z 2000.2551419247116 806-91 1855.16 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166974 H4 2000-05-11T10:57:00 ... ZEP 2000 4 6 10 30 0 2000-04-06T10:30:00Z 2000.2634904371585 807-91 1857.19 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166975 H4 2000-05-11T11:10:00 ... ZEP 2000 4 10 10 50 0 2000-04-10T10:50:00Z 2000.274457346691 809-91 1865.62 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166976 H4 2000-05-11T11:23:00 ... ZEP 2000 4 13 9 5 0 2000-04-13T09:05:00Z 2000.2824548421372 743-91 1866.36 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166977 H4 2000-05-10T15:02:00 ... ZEP 2000 4 13 9 5 0 2000-04-13T09:05:00Z 2000.2824548421372 744-91 1865.33 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166978 H4 2000-05-10T15:15:00 ... ZEP 2000 4 21 9 10 0 2000-04-21T09:10:00Z 2000.3043222525805 131-98 1864.95 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166979 H4 2000-06-07T10:32:00 ... ZEP 2000 4 21 9 10 0 2000-04-21T09:10:00Z 2000.3043222525805 132-98 1868.81 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166980 H4 2000-06-07T10:45:00 ... ZEP 2000 4 24 9 0 0 2000-04-24T09:00:00Z 2000.3125 799-91 1866.11 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166981 H4 2000-06-01T16:06:00 ... ZEP 2000 4 24 9 0 0 2000-04-24T09:00:00Z 2000.3125 800-91 1864.24 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166982 H4 2000-06-01T16:19:00 ... ZEP 2000 4 27 9 15 0 2000-04-27T09:15:00Z 2000.3207251821493 1725-91 1863.41 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166983 H4 2000-06-07T10:58:00 ... ZEP 2000 4 27 9 15 0 2000-04-27T09:15:00Z 2000.3207251821493 1726-91 1859.68 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166984 H4 2000-06-07T11:11:00 ... ZEP 2000 5 1 11 0 0 2000-05-01T11:00:00Z 2000.3318533697632 787-91 1863.1 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166985 H4 2000-06-01T15:14:00 ... ZEP 2000 5 1 11 0 0 2000-05-01T11:00:00Z 2000.3318533697632 788-91 1862.26 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166986 H4 2000-06-01T15:27:00 ... ZEP 2000 5 4 9 0 0 2000-05-04T09:00:00Z 2000.3398224043715 801-91 1854.94 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166987 H4 2000-06-14T13:35:00 ... ZEP 2000 5 4 9 0 0 2000-05-04T09:00:00Z 2000.3398224043715 802-91 1854.76 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166988 H4 2000-06-14T13:48:00 ... ZEP 2000 5 9 8 30 0 2000-05-09T08:30:00Z 2000.3534266848817 783-91 1851.35 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166989 H4 2000-06-15T10:29:00 ... ZEP 2000 5 9 8 30 0 2000-05-09T08:30:00Z 2000.3534266848817 784-91 1853.85 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166990 H4 2000-06-15T10:42:00 ... ZEP 2000 5 11 9 6 0 2000-05-11T09:06:00Z 2000.3589594717669 815-91 1856.9 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166991 H4 2000-06-15T10:03:00 ... ZEP 2000 5 11 9 6 0 2000-05-11T09:06:00Z 2000.3589594717669 816-91 1855.3 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166992 H4 2000-06-15T10:16:00 ... ZEP 2000 5 11 9 50 0 2000-05-11T09:50:00Z 2000.3590429568912 803-91 1855.32 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166993 H4 2000-06-14T14:54:00 ... ZEP 2000 5 11 9 50 0 2000-05-11T09:50:00Z 2000.3590429568912 804-91 1853.99 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166994 H4 2000-06-14T15:07:00 ... ZEP 2000 5 15 9 0 0 2000-05-15T09:00:00Z 2000.3698770491803 737-91 1853.42 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166995 H4 2000-06-14T14:01:00 ... ZEP 2000 5 15 9 0 0 2000-05-15T09:00:00Z 2000.3698770491803 738-91 1854.24 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166996 H4 2000-06-14T14:15:00 ... ZEP 2000 5 18 9 45 0 2000-05-18T09:45:00Z 2000.3781591530055 1981-91 1850.52 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166997 H4 2000-06-13T13:57:00 ... ZEP 2000 5 18 9 45 0 2000-05-18T09:45:00Z 2000.3781591530055 1982-91 1851.99 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166998 H4 2000-06-13T14:10:00 ... ZEP 2000 5 22 9 20 0 2000-05-22T09:20:00Z 2000.3890406800242 735-91 1849.89 1.4 78.9067 11.8883 479.0 474.0 5.0 P 166999 H4 2000-06-14T14:28:00 ... ZEP 2000 5 22 9 20 0 2000-05-22T09:20:00Z 2000.3890406800242 736-91 1849.58 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167000 H4 2000-06-14T14:41:00 ... ZEP 2000 5 25 9 0 0 2000-05-25T09:00:00Z 2000.3971994535518 1085-91 1846.82 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167001 H4 2000-06-13T14:23:00 ... ZEP 2000 5 25 9 0 0 2000-05-25T09:00:00Z 2000.3971994535518 1086-91 1847.55 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167002 H4 2000-06-13T14:36:00 ... ZEP 2000 5 29 8 55 0 2000-05-29T08:55:00Z 2000.4081189283545 791-91 1848.85 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167003 H4 2000-08-02T13:45:00 ... ZEP 2000 5 29 8 55 0 2000-05-29T08:55:00Z 2000.4081189283545 792-91 1846.52 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167004 H4 2000-08-02T13:58:00 ... ZEP 2000 6 2 9 27 0 2000-06-02T09:27:00Z 2000.4191086065573 325-91 1845.82 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167005 H4 2000-08-03T10:09:00 ... ZEP 2000 6 2 9 27 0 2000-06-02T09:27:00Z 2000.4191086065573 326-91 1842.61 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167006 H4 2000-08-03T10:22:00 ... ZEP 2000 6 5 9 30 0 2000-06-05T09:30:00Z 2000.4273110200365 733-91 1842.03 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167007 H4 2000-08-02T14:11:00 ... ZEP 2000 6 5 9 30 0 2000-06-05T09:30:00Z 2000.4273110200365 734-91 1842.33 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167008 H4 2000-08-02T14:24:00 ... ZEP 2000 6 8 9 25 0 2000-06-08T09:25:00Z 2000.4354982544019 4221-91 1841.29 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167009 H4 2000-08-03T11:29:00 ... ZEP 2000 6 8 9 25 0 2000-06-08T09:25:00Z 2000.4354982544019 4222-91 1840.02 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167010 H4 2000-08-03T11:42:00 ... ZEP 2000 6 12 9 30 0 2000-06-12T09:30:00Z 2000.4464367030967 739-91 1839.23 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167011 H4 2000-08-02T12:51:00 ... ZEP 2000 6 12 9 30 0 2000-06-12T09:30:00Z 2000.4464367030967 740-91 1838.0 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167012 H4 2000-08-02T13:04:00 ... ZEP 2000 6 15 9 0 0 2000-06-15T09:00:00Z 2000.4545765027322 811-91 1838.18 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167013 H4 2000-08-02T11:31:00 ... ZEP 2000 6 15 9 0 0 2000-06-15T09:00:00Z 2000.4545765027322 812-91 1840.02 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167014 H4 2000-08-02T11:44:00 ... ZEP 2000 6 19 9 15 0 2000-06-19T09:15:00Z 2000.4655339253188 813-91 1838.63 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167015 H4 2000-08-04T11:12:00 ... ZEP 2000 6 19 9 15 0 2000-06-19T09:15:00Z 2000.4655339253188 814-91 1839.15 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167016 H4 2000-08-04T11:25:00 ... ZEP 2000 6 22 9 5 0 2000-06-22T09:05:00Z 2000.4737116727383 4167-91 1837.13 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167017 H4 2000-08-03T09:43:00 ... ZEP 2000 6 22 9 5 0 2000-06-22T09:05:00Z 2000.4737116727383 4168-91 1837.01 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167018 H4 2000-08-03T09:56:00 ... ZEP 2000 6 26 9 19 0 2000-06-26T09:19:00Z 2000.4846671979356 785-91 1832.25 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167019 H4 2000-08-04T11:38:00 ... ZEP 2000 6 26 9 19 0 2000-06-26T09:19:00Z 2000.4846671979356 786-91 1832.57 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167020 H4 2000-08-04T11:51:00 ... ZEP 2000 6 29 9 5 0 2000-06-29T09:05:00Z 2000.4928373557984 223-91 1829.77 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167021 H4 2000-08-02T15:03:00 ... ZEP 2000 6 29 9 5 0 2000-06-29T09:05:00Z 2000.4928373557984 224-91 1827.98 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167022 H4 2000-08-02T15:16:00 ... ZEP 2000 7 3 9 2 0 2000-07-03T09:02:00Z 2000.5037606253795 789-91 1824.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167023 H4 2000-08-02T14:37:00 ... ZEP 2000 7 3 9 2 0 2000-07-03T09:02:00Z 2000.5037606253795 790-91 1826.34 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167024 H4 2000-08-02T14:50:00 ... ZEP 2000 7 6 8 50 0 2000-07-06T08:50:00Z 2000.5119345780206 4201-91 1827.83 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167025 H4 2000-08-03T14:35:00 ... ZEP 2000 7 6 8 50 0 2000-07-06T08:50:00Z 2000.5119345780206 4202-91 1827.05 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167026 H4 2000-08-03T14:48:00 ... ZEP 2000 7 11 8 5 0 2000-07-11T08:05:00Z 2000.5255103976929 445-91 1832.53 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167027 H4 2000-08-03T14:09:00 ... ZEP 2000 7 11 8 5 0 2000-07-11T08:05:00Z 2000.5255103976929 446-91 1831.35 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167028 H4 2000-08-03T14:22:00 ... ZEP 2000 7 13 8 57 0 2000-07-13T08:57:00Z 2000.5310735428052 4051-91 1831.32 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167029 H4 2000-09-22T11:19:00 ... ZEP 2000 7 13 8 57 0 2000-07-13T08:57:00Z 2000.5310735428052 4052-91 1828.68 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167030 H4 2000-09-22T11:32:00 ... ZEP 2000 7 17 9 16 0 2000-07-17T09:16:00Z 2000.5420385549485 781-91 1830.84 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167031 H4 2000-08-02T13:17:00 ... ZEP 2000 7 17 9 16 0 2000-07-17T09:16:00Z 2000.5420385549485 782-91 1828.7 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167032 H4 2000-08-02T13:30:00 ... ZEP 2000 7 20 8 55 0 2000-07-20T08:55:00Z 2000.5501954310869 677-91 1851.78 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167033 H4 2000-09-22T13:31:00 ... ZEP 2000 7 20 8 55 0 2000-07-20T08:55:00Z 2000.5501954310869 678-91 1854.42 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167034 H4 2000-09-22T13:44:00 ... ZEP 2000 7 24 9 30 0 2000-07-24T09:30:00Z 2000.561190801457 745-91 1823.48 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167035 H4 2000-09-27T15:02:00 ... ZEP 2000 7 24 9 30 0 2000-07-24T09:30:00Z 2000.561190801457 746-91 1822.87 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167036 H4 2000-09-27T15:15:00 ... ZEP 2000 7 27 8 52 0 2000-07-27T08:52:00Z 2000.5693154219794 1855-91 1831.25 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167037 H4 2000-09-27T15:28:00 ... ZEP 2000 7 27 8 52 0 2000-07-27T08:52:00Z 2000.5693154219794 1856-91 1830.52 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167038 H4 2000-09-27T15:41:00 ... ZEP 2000 8 1 12 34 56 2000-08-01T12:34:56Z 2000.5833996154624 793-91 1829.3 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167039 H4 2000-09-27T14:35:00 ... ZEP 2000 8 1 12 34 56 2000-08-01T12:34:56Z 2000.5833996154624 794-91 1829.15 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167040 H4 2000-09-27T14:49:00 ... ZEP 2000 8 3 8 59 0 2000-08-03T08:59:00Z 2000.5884543867637 181-91 1828.68 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167041 H4 2000-09-28T09:49:00 ... ZEP 2000 8 3 8 59 0 2000-08-03T08:59:00Z 2000.5884543867637 182-91 1829.84 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167042 H4 2000-09-28T10:02:00 ... ZEP 2000 8 7 8 59 0 2000-08-07T08:59:00Z 2000.5993833485124 4007-91 1832.68 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167043 H4 2000-09-26T10:25:00 ... ZEP 2000 8 7 8 59 0 2000-08-07T08:59:00Z 2000.5993833485124 4008-91 1832.1 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167044 H4 2000-09-26T10:38:00 ... ZEP 2000 8 10 9 5 0 2000-08-10T09:05:00Z 2000.607591454159 645-91 1838.35 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167045 H4 2000-09-18T11:00:00 ... ZEP 2000 8 10 9 5 0 2000-08-10T09:05:00Z 2000.607591454159 646-91 1835.79 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167046 H4 2000-09-18T11:13:00 ... ZEP 2000 8 14 9 36 0 2000-08-14T09:36:00Z 2000.6185792349727 755-91 1830.29 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167047 H4 2000-09-26T09:31:00 ... ZEP 2000 8 14 9 36 0 2000-08-14T09:36:00Z 2000.6185792349727 756-91 1831.09 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167048 H4 2000-09-26T09:44:00 ... ZEP 2000 8 18 10 12 0 2000-08-18T10:12:00Z 2000.6295765027323 73-98 1839.83 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167049 H4 2000-09-18T12:18:00 ... ZEP 2000 8 18 10 12 0 2000-08-18T10:12:00Z 2000.6295765027323 74-98 1839.3 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167050 H4 2000-09-18T12:31:00 ... ZEP 2000 8 22 8 30 0 2000-08-22T08:30:00Z 2000.6403119307834 737-91 1834.28 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167051 H4 2000-09-22T11:45:00 ... ZEP 2000 8 22 8 30 0 2000-08-22T08:30:00Z 2000.6403119307834 738-91 1832.4 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167052 H4 2000-09-22T11:58:00 ... ZEP 2000 8 29 8 54 0 2000-08-29T08:54:00Z 2000.659483151184 803-91 1833.98 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167053 H4 2000-09-22T12:11:00 ... ZEP 2000 8 29 8 54 0 2000-08-29T08:54:00Z 2000.659483151184 804-91 1835.87 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167054 H4 2000-09-22T12:24:00 ... ZEP 2000 9 1 10 10 0 2000-09-01T10:10:00Z 2000.6678240740741 41-91 1846.66 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167055 H4 2000-11-01T09:00:00 ... ZEP 2000 9 1 10 10 0 2000-09-01T10:10:00Z 2000.6678240740741 42-91 1849.3 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167056 H4 2000-11-01T09:13:00 ... ZEP 2000 9 7 9 35 0 2000-09-07T09:35:00Z 2000.6841511080752 1161-91 1835.29 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167057 H4 2000-11-01T09:28:00 ... ZEP 2000 9 7 9 35 0 2000-09-07T09:35:00Z 2000.6841511080752 1162-91 1836.71 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167058 H4 2000-11-01T09:41:00 ... ZEP 2000 9 12 9 48 0 2000-09-12T09:48:00Z 2000.6978369763206 795-91 1841.88 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167059 H4 2000-10-31T13:01:00 ... ZEP 2000 9 12 9 48 0 2000-09-12T09:48:00Z 2000.6978369763206 796-91 1841.36 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167060 H4 2000-10-31T13:14:00 ... ZEP 2000 9 18 8 55 0 2000-09-18T08:55:00Z 2000.7141298573163 747-91 1840.09 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167061 H4 2000-10-31T13:27:00 ... ZEP 2000 9 21 9 7 0 2000-09-21T09:07:00Z 2000.7223493472982 317-91 1837.79 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167062 H4 2000-10-31T11:02:00 ... ZEP 2000 9 21 9 7 0 2000-09-21T09:07:00Z 2000.7223493472982 318-91 1838.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167063 H4 2000-10-31T11:15:00 ... ZEP 2000 9 25 8 15 0 2000-09-25T08:15:00Z 2000.7331796448088 785-91 1844.24 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167064 H4 2000-10-31T11:54:00 ... ZEP 2000 9 25 8 15 0 2000-09-25T08:15:00Z 2000.7331796448088 786-91 1844.43 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167065 H4 2000-10-31T12:07:00 ... ZEP 2000 9 29 8 15 0 2000-09-29T08:15:00Z 2000.7441086065573 1693-91 1840.77 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167066 H4 2000-10-31T11:28:00 ... ZEP 2000 9 29 8 15 0 2000-09-29T08:15:00Z 2000.7441086065573 1694-91 1843.03 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167067 H4 2000-10-31T11:41:00 ... ZEP 2000 10 2 9 5 0 2000-10-02T09:05:00Z 2000.7524001973284 813-91 1844.45 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167068 H4 2000-10-31T12:22:00 ... ZEP 2000 10 2 9 5 0 2000-10-02T09:05:00Z 2000.7524001973284 814-91 1845.39 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167069 H4 2000-10-31T12:35:00 ... ZEP 2000 10 6 9 45 0 2000-10-06T09:45:00Z 2000.7634050546449 277-91 1849.9 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167070 H4 2000-11-01T12:08:00 ... ZEP 2000 10 6 9 45 0 2000-10-06T09:45:00Z 2000.7634050546449 278-91 1850.79 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167071 H4 2000-11-01T12:21:00 ... ZEP 2000 10 6 10 25 0 2000-10-06T10:25:00Z 2000.7634809502124 1759-91 1851.11 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167072 H4 2000-11-01T12:34:00 ... ZEP 2000 10 6 10 25 0 2000-10-06T10:25:00Z 2000.7634809502124 1760-91 1849.75 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167073 H4 2000-11-01T12:47:00 ... ZEP 2000 10 9 9 35 0 2000-10-09T09:35:00Z 2000.7715828020644 811-91 1847.43 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167074 H4 2000-11-01T11:14:00 ... ZEP 2000 10 9 9 35 0 2000-10-09T09:35:00Z 2000.7715828020644 812-91 1849.3 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167075 H4 2000-11-01T11:27:00 ... ZEP 2000 10 13 10 17 0 2000-10-13T10:17:00Z 2000.782591454159 283-91 1857.29 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167076 H4 2000-12-07T13:51:00 ... ZEP 2000 10 13 10 17 0 2000-10-13T10:17:00Z 2000.782591454159 284-91 1857.74 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167077 H4 2000-12-07T14:04:00 ... ZEP 2000 10 16 10 7 0 2000-10-16T10:07:00Z 2000.7907692015785 789-91 1847.9 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167078 H4 2000-11-01T11:40:00 ... ZEP 2000 10 16 10 7 0 2000-10-16T10:07:00Z 2000.7907692015785 790-91 1845.35 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167079 H4 2000-11-01T11:53:00 ... ZEP 2000 10 20 9 50 0 2000-10-20T09:50:00Z 2000.801665907711 1671-91 1849.64 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167080 H4 2000-12-11T07:59:00 ... ZEP 2000 10 20 9 50 0 2000-10-20T09:50:00Z 2000.801665907711 1672-91 1847.75 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167081 H4 2000-12-11T08:12:00 ... ZEP 2000 10 24 7 34 0 2000-10-24T07:34:00Z 2000.8123368245294 805-91 1847.62 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167082 H4 2000-12-07T12:57:00 ... ZEP 2000 10 24 7 34 0 2000-10-24T07:34:00Z 2000.8123368245294 806-91 1844.38 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167083 H4 2000-12-07T13:10:00 ... ZEP 2000 10 28 13 32 0 2000-10-28T13:32:00Z 2000.823945051609 743-91 1847.74 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167084 H4 2000-12-07T13:23:00 ... ZEP 2000 10 28 13 32 0 2000-10-28T13:32:00Z 2000.823945051609 744-91 1847.35 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167085 H4 2000-12-07T13:37:00 ... ZEP 2000 11 2 9 45 0 2000-11-02T09:45:00Z 2000.8371755464482 4373-91 1848.23 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167086 H4 2000-12-07T12:31:00 ... ZEP 2000 11 2 9 45 0 2000-11-02T09:45:00Z 2000.8371755464482 4374-91 1850.2 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167087 H4 2000-12-07T12:44:00 ... ZEP 2000 11 7 10 9 0 2000-11-07T10:09:00Z 2000.8508822859744 791-91 1857.71 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167088 H4 2000-12-08T09:57:00 ... ZEP 2000 11 7 10 9 0 2000-11-07T10:09:00Z 2000.8508822859744 792-91 1858.49 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167089 H4 2000-12-08T10:10:00 ... ZEP 2000 11 10 9 50 0 2000-11-10T09:50:00Z 2000.8590429568912 4946-91 1866.09 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167090 H4 2000-12-07T12:05:00 ... ZEP 2000 11 10 9 50 0 2000-11-10T09:50:00Z 2000.8590429568912 4947-91 1862.79 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167091 H4 2000-12-07T12:18:00 ... ZEP 2000 11 13 12 34 56 2000-11-13T12:34:56Z 2000.867552620927 781-91 1859.93 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167092 H4 2000-12-08T10:23:00 ... ZEP 2000 11 13 12 34 56 2000-11-13T12:34:56Z 2000.867552620927 782-91 1861.19 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167093 H4 2000-12-08T10:36:00 ... ZEP 2000 11 16 8 30 0 2000-11-16T08:30:00Z 2000.875284608379 4955-91 1854.55 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167094 H4 2000-12-19T12:06:00 ... ZEP 2000 11 16 8 30 0 2000-11-16T08:30:00Z 2000.875284608379 4956-91 1850.64 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167095 H4 2000-12-19T12:19:00 ... ZEP 2000 11 20 8 55 0 2000-11-20T08:55:00Z 2000.8862610048573 815-91 1851.45 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167096 H4 2000-12-27T13:18:00 ... ZEP 2000 11 20 8 55 0 2000-11-20T08:55:00Z 2000.8862610048573 816-91 1852.3 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167097 H4 2000-12-27T13:31:00 ... ZEP 2000 11 24 10 5 0 2000-11-24T10:05:00Z 2000.8973227838494 1397-91 1856.91 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167098 H4 2000-12-19T11:39:00 ... ZEP 2000 11 24 10 5 0 2000-11-24T10:05:00Z 2000.8973227838494 1398-91 1858.53 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167099 H4 2000-12-19T11:53:00 ... ZEP 2000 11 27 9 29 0 2000-11-27T09:29:00Z 2000.9054511991499 783-91 1857.99 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167100 H4 2000-12-27T12:52:00 ... ZEP 2000 11 27 9 29 0 2000-11-27T09:29:00Z 2000.9054511991499 784-91 1859.25 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167101 H4 2000-12-27T13:05:00 ... ZEP 2000 11 30 10 38 0 2000-11-30T10:38:00Z 2000.9137788403157 1769-91 1854.42 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167102 H4 2001-01-17T14:58:00 ... ZEP 2000 11 30 10 38 0 2000-11-30T10:38:00Z 2000.9137788403157 1770-91 1854.95 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167103 H4 2001-01-17T15:11:00 ... ZEP 2000 12 4 11 21 0 2000-12-04T11:21:00Z 2000.9247893897996 801-91 1859.35 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167104 H4 2001-01-18T08:59:00 ... ZEP 2000 12 4 11 21 0 2000-12-04T11:21:00Z 2000.9247893897996 802-91 1860.45 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167105 H4 2001-01-18T09:12:00 ... ZEP 2000 12 7 9 36 0 2000-12-07T09:36:00Z 2000.9327868852458 4525-91 1863.48 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167106 H4 2001-01-17T14:31:00 ... ZEP 2000 12 7 9 36 0 2000-12-07T09:36:00Z 2000.9327868852458 4526-91 1863.58 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167107 H4 2001-01-17T14:44:00 ... ZEP 2000 12 18 9 25 0 2000-12-18T09:25:00Z 2000.9628206587736 733-91 1854.36 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167108 H4 2001-01-18T11:39:00 ... ZEP 2000 12 18 9 25 0 2000-12-18T09:25:00Z 2000.9628206587736 734-91 1853.29 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167109 H4 2001-01-18T11:52:00 ... ZEP 2000 12 21 9 10 0 2000-12-21T09:10:00Z 2000.970988919247 1055-91 1881.03 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167110 H4 2001-01-17T13:12:00 ... ZEP 2000 12 21 9 10 0 2000-12-21T09:10:00Z 2000.970988919247 1056-91 1879.14 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167111 H4 2001-01-17T13:25:00 ... ZEP 2000 12 25 9 50 0 2000-12-25T09:50:00Z 2000.9819937765635 739-91 1883.54 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167112 H4 2001-01-18T12:05:00 ... ZEP 2000 12 25 9 50 0 2000-12-25T09:50:00Z 2000.9819937765635 740-91 1887.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167113 H4 2001-01-18T12:19:00 ... ZEP 2000 12 28 8 25 0 2000-12-28T08:25:00Z 2000.9900292197935 485-91 1871.03 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167114 H4 2001-01-17T13:38:00 ... ZEP 2000 12 28 8 25 0 2000-12-28T08:25:00Z 2000.9900292197935 486-91 1872.03 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167115 H4 2001-01-17T13:51:00 ... ZEP 2001 1 1 12 34 56 2001-01-01T12:34:56Z 2001.0014363267378 735-91 1862.35 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167116 H4 2001-01-18T09:25:00 ... ZEP 2001 1 1 12 34 56 2001-01-01T12:34:56Z 2001.0014363267378 736-91 1865.3 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167117 H4 2001-01-18T09:39:00 ... ZEP 2001 1 4 11 0 0 2001-01-04T11:00:00Z 2001.0094748858448 4503-91 1880.93 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167118 H4 2001-02-01T13:05:00 ... ZEP 2001 1 4 11 0 0 2001-01-04T11:00:00Z 2001.0094748858448 4504-91 1881.29 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167119 H4 2001-02-01T13:19:00 ... ZEP 2001 1 8 10 20 0 2001-01-08T10:20:00Z 2001.0203576864535 787-91 1875.12 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167120 H4 2001-02-01T12:39:00 ... ZEP 2001 1 8 10 20 0 2001-01-08T10:20:00Z 2001.0203576864535 788-91 1876.11 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167121 H4 2001-02-01T12:52:00 ... ZEP 2001 1 11 8 42 0 2001-01-11T08:42:00Z 2001.028390410959 4033-91 1899.96 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167122 H4 2001-02-01T12:13:00 ... ZEP 2001 1 11 8 42 0 2001-01-11T08:42:00Z 2001.028390410959 4034-91 1901.98 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167123 H4 2001-02-01T12:26:00 ... ZEP 2001 1 15 9 55 0 2001-01-15T09:55:00Z 2001.0394882039575 799-91 1892.0 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167124 H4 2001-02-01T11:47:00 ... ZEP 2001 1 15 9 55 0 2001-01-15T09:55:00Z 2001.0394882039575 800-91 1891.38 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167125 H4 2001-02-01T12:00:00 ... ZEP 2001 1 18 8 30 0 2001-01-18T08:30:00Z 2001.0475456621004 597-91 1885.66 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167126 H4 2001-02-14T10:48:00 ... ZEP 2001 1 18 8 30 0 2001-01-18T08:30:00Z 2001.0475456621004 598-91 1887.7 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167127 H4 2001-02-14T11:01:00 ... ZEP 2001 1 22 10 5 0 2001-01-22T10:05:00Z 2001.0586853120244 795-91 1862.69 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167128 H4 2001-02-14T12:08:00 ... ZEP 2001 1 22 10 5 0 2001-01-22T10:05:00Z 2001.0586853120244 796-91 1862.29 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167129 H4 2001-02-14T12:21:00 ... ZEP 2001 1 25 9 10 0 2001-01-25T09:10:00Z 2001.066799847793 359-91 1857.13 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167130 H4 2001-02-14T13:00:00 ... ZEP 2001 1 25 9 10 0 2001-01-25T09:10:00Z 2001.066799847793 360-91 1854.85 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167131 H4 2001-02-14T13:13:00 ... ZEP 2001 1 29 9 40 0 2001-01-29T09:40:00Z 2001.0778158295282 737-91 1884.54 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167132 H4 2001-02-14T12:34:00 ... ZEP 2001 1 29 9 40 0 2001-01-29T09:40:00Z 2001.0778158295282 738-91 1884.75 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167133 H4 2001-02-14T12:47:00 ... ZEP 2001 2 4 13 10 0 2001-02-04T13:10:00Z 2001.0946537290715 789-91 1861.48 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167134 H4 2001-03-12T09:45:00 ... ZEP 2001 2 4 13 10 0 2001-02-04T13:10:00Z 2001.0946537290715 790-91 1861.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167135 H4 2001-03-12T09:58:00 ... ZEP 2001 2 8 8 13 0 2001-02-08T08:13:00Z 2001.105047564688 1579-91 1897.38 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167136 H4 2001-03-12T16:24:00 ... ZEP 2001 2 8 8 13 0 2001-02-08T08:13:00Z 2001.105047564688 1580-91 1897.1 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167137 H4 2001-03-12T16:37:00 ... ZEP 2001 2 12 10 25 0 2001-02-12T10:25:00Z 2001.11625761035 4007-91 1852.96 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167138 H4 2001-03-08T13:16:00 ... ZEP 2001 2 15 8 30 0 2001-02-15T08:30:00Z 2001.1242579908676 569-91 1857.26 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167139 H4 2001-03-12T15:05:00 ... ZEP 2001 2 15 8 30 0 2001-02-15T08:30:00Z 2001.1242579908676 570-91 1855.34 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167140 H4 2001-03-12T15:18:00 ... ZEP 2001 2 20 9 50 0 2001-02-20T09:50:00Z 2001.1381088280061 91-91 1856.28 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167141 H4 2001-03-28T08:55:00 ... ZEP 2001 2 20 9 50 0 2001-02-20T09:50:00Z 2001.1381088280061 92-91 1856.12 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167142 H4 2001-03-28T09:08:00 ... ZEP 2001 2 22 9 32 0 2001-02-22T09:32:00Z 2001.1435540334855 1113-91 1880.94 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167143 H4 2001-03-23T10:01:00 ... ZEP 2001 2 22 9 32 0 2001-02-22T09:32:00Z 2001.1435540334855 1114-91 1879.93 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167144 H4 2001-03-23T10:14:00 ... ZEP 2001 2 26 10 23 0 2001-02-26T10:23:00Z 2001.1546099695586 301-91 1859.57 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167145 H4 2001-03-28T09:22:00 ... ZEP 2001 2 26 10 23 0 2001-02-26T10:23:00Z 2001.1546099695586 302-91 1859.42 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167146 H4 2001-03-28T09:35:00 ... ZEP 2001 3 1 12 50 0 2001-03-01T12:50:00Z 2001.163108828006 4263-91 1867.4 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167147 H4 2001-03-23T10:53:00 ... ZEP 2001 3 1 12 50 0 2001-03-01T12:50:00Z 2001.163108828006 4264-91 1866.06 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167148 H4 2001-03-23T11:06:00 ... ZEP 2001 3 5 9 25 0 2001-03-05T09:25:00Z 2001.1736777016743 781-91 1866.62 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167149 H4 2001-04-13T12:13:00 ... ZEP 2001 3 5 9 25 0 2001-03-05T09:25:00Z 2001.1736777016743 782-91 1868.52 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167150 H4 2001-04-13T12:26:00 ... ZEP 2001 3 8 9 38 0 2001-03-08T09:38:00Z 2001.1819216133943 39-98 1879.07 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167151 H4 2001-04-17T12:01:00 ... ZEP 2001 3 8 9 38 0 2001-03-08T09:38:00Z 2001.1819216133943 40-98 1877.45 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167152 H4 2001-04-17T12:14:00 ... ZEP 2001 3 12 8 57 0 2001-03-12T08:57:00Z 2001.1928025114155 791-91 1886.2 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167153 H4 2001-04-13T11:47:00 ... ZEP 2001 3 12 8 57 0 2001-03-12T08:57:00Z 2001.1928025114155 792-91 1887.25 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167154 H4 2001-04-13T12:00:00 ... ZEP 2001 3 15 8 20 0 2001-03-15T08:20:00Z 2001.2009512937595 1429-91 1867.9 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167155 H4 2001-04-17T11:35:00 ... ZEP 2001 3 15 8 20 0 2001-03-15T08:20:00Z 2001.2009512937595 1430-91 1869.09 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167156 H4 2001-04-17T11:48:00 ... ZEP 2001 3 19 9 42 0 2001-03-19T09:42:00Z 2001.2120662100456 811-91 1875.2 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167157 H4 2001-04-23T11:02:00 ... ZEP 2001 3 19 9 42 0 2001-03-19T09:42:00Z 2001.2120662100456 812-91 1875.27 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167158 H4 2001-04-23T11:15:00 ... ZEP 2001 3 22 9 44 0 2001-03-22T09:44:00Z 2001.220289193303 353-91 1856.25 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167159 H4 2001-04-23T14:34:00 ... ZEP 2001 3 22 9 44 0 2001-03-22T09:44:00Z 2001.220289193303 354-91 1856.44 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167160 H4 2001-04-23T14:47:00 ... ZEP 2001 3 26 7 55 0 2001-03-26T07:55:00Z 2001.231040715373 803-91 1866.95 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167161 H4 2001-04-24T13:43:00 ... ZEP 2001 3 26 7 55 0 2001-03-26T07:55:00Z 2001.231040715373 804-91 1866.33 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167162 H4 2001-04-24T13:56:00 ... ZEP 2001 3 29 9 0 0 2001-03-29T09:00:00Z 2001.2393835616438 547-91 1856.14 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167163 H4 2001-04-23T15:52:00 ... ZEP 2001 3 29 9 0 0 2001-03-29T09:00:00Z 2001.2393835616438 548-91 1855.36 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167164 H4 2001-04-23T16:05:00 ... ZEP 2001 4 2 7 42 0 2001-04-02T07:42:00Z 2001.250194063927 4627-91 1859.44 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167165 H4 2001-05-04T12:09:00 ... ZEP 2001 4 2 7 42 0 2001-04-02T07:42:00Z 2001.250194063927 4628-91 1859.92 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167166 H4 2001-05-04T12:22:00 ... ZEP 2001 4 5 8 47 0 2001-04-05T08:47:00Z 2001.2585369101978 1379-91 1872.11 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167167 H4 2001-05-07T10:48:00 ... ZEP 2001 4 5 8 47 0 2001-04-05T08:47:00Z 2001.2585369101978 1380-91 1872.92 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167168 H4 2001-05-07T11:01:00 ... ZEP 2001 4 9 8 22 0 2001-04-09T08:22:00Z 2001.2694482496195 4637-91 1866.92 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167169 H4 2001-05-04T13:01:00 ... ZEP 2001 4 9 8 22 0 2001-04-09T08:22:00Z 2001.2694482496195 4638-91 1866.44 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167170 H4 2001-05-04T13:14:00 ... ZEP 2001 4 12 7 25 0 2001-04-12T07:25:00Z 2001.2775589802131 4455-91 1863.77 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167171 H4 2001-05-07T11:14:00 ... ZEP 2001 4 12 7 25 0 2001-04-12T07:25:00Z 2001.2775589802131 4456-91 1862.03 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167172 H4 2001-05-07T11:27:00 ... ZEP 2001 4 16 7 30 0 2001-04-16T07:30:00Z 2001.2885273972602 785-91 1861.53 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167173 H4 2001-05-23T11:03:00 ... ZEP 2001 4 16 7 30 0 2001-04-16T07:30:00Z 2001.2885273972602 786-91 1860.73 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167174 H4 2001-05-23T11:16:00 ... ZEP 2001 4 19 8 30 0 2001-04-19T08:30:00Z 2001.2968607305936 2007-91 1864.4 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167175 H4 2001-05-23T10:35:00 ... ZEP 2001 4 19 8 30 0 2001-04-19T08:30:00Z 2001.2968607305936 2008-91 1864.92 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167176 H4 2001-05-23T10:48:00 ... ZEP 2001 4 23 12 34 56 2001-04-23T12:34:56Z 2001.3082856418062 813-91 1870.32 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167177 H4 2001-05-23T12:21:00 ... ZEP 2001 4 23 12 34 56 2001-04-23T12:34:56Z 2001.3082856418062 814-91 1868.57 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167178 H4 2001-05-23T12:34:00 ... ZEP 2001 4 26 8 3 0 2001-04-26T08:03:00Z 2001.3159874429223 1323-91 1844.43 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167179 H4 2001-05-23T11:55:00 ... ZEP 2001 4 26 8 3 0 2001-04-26T08:03:00Z 2001.3159874429223 1324-91 1848.39 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167180 H4 2001-05-23T12:08:00 ... ZEP 2001 4 30 9 40 0 2001-04-30T09:40:00Z 2001.3271308980213 745-91 1853.06 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167181 H4 2001-06-08T14:28:00 ... ZEP 2001 4 30 9 40 0 2001-04-30T09:40:00Z 2001.3271308980213 746-91 1854.17 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167182 H4 2001-06-08T14:41:00 ... ZEP 2001 5 3 7 58 0 2001-05-03T07:58:00Z 2001.3351560121766 1465-91 1853.5 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167183 H4 2001-06-06T11:48:00 ... ZEP 2001 5 3 7 58 0 2001-05-03T07:58:00Z 2001.3351560121766 1466-91 1852.3 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167184 H4 2001-06-06T12:01:00 ... ZEP 2001 5 10 9 15 0 2001-05-10T09:15:00Z 2001.3544805936074 29-91 1870.27 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167185 H4 2001-06-06T12:14:00 ... ZEP 2001 5 10 9 15 0 2001-05-10T09:15:00Z 2001.3544805936074 30-91 1871.8 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167186 H4 2001-06-06T12:27:00 ... ZEP 2001 5 17 8 0 0 2001-05-17T08:00:00Z 2001.3735159817352 793-91 1856.57 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167187 H4 2001-06-08T14:54:00 ... ZEP 2001 5 17 8 0 0 2001-05-17T08:00:00Z 2001.3735159817352 794-91 1857.47 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167188 H4 2001-06-08T15:07:00 ... ZEP 2001 5 24 10 2 0 2001-05-24T10:02:00Z 2001.3929261796043 807-91 1846.78 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167189 H4 2001-06-21T14:36:00 ... ZEP 2001 5 24 10 2 0 2001-05-24T10:02:00Z 2001.3929261796043 808-91 1848.11 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167190 H4 2001-06-21T14:49:00 ... ZEP 2001 5 31 9 54 0 2001-05-31T09:54:00Z 2001.412089041096 743-91 1849.09 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167191 H4 2001-06-21T14:10:00 ... ZEP 2001 5 31 9 54 0 2001-05-31T09:54:00Z 2001.412089041096 744-91 1848.53 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167192 H4 2001-06-21T14:23:00 ... ZEP 2001 6 7 8 15 0 2001-06-07T08:15:00Z 2001.4310787671234 4001-91 1842.53 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167193 H4 2001-07-05T13:55:00 ... ZEP 2001 6 7 8 15 0 2001-06-07T08:15:00Z 2001.4310787671234 4002-91 1843.0 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167194 H4 2001-07-05T14:08:00 ... ZEP 2001 6 14 8 18 0 2001-06-14T08:18:00Z 2001.4502625570776 853-91 1844.1 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167195 H4 2001-07-05T12:35:00 ... ZEP 2001 6 14 8 18 0 2001-06-14T08:18:00Z 2001.4502625570776 854-91 1843.68 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167196 H4 2001-07-05T12:48:00 ... ZEP 2001 6 21 10 20 0 2001-06-21T10:20:00Z 2001.4696727549467 281-99 1850.06 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167197 H4 2001-07-20T15:04:00 ... ZEP 2001 6 21 10 20 0 2001-06-21T10:20:00Z 2001.4696727549467 282-99 1850.27 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167198 H4 2001-07-20T15:17:00 ... ZEP 2001 6 28 8 33 0 2001-06-28T08:33:00Z 2001.4886472602739 275-99 1830.49 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167199 H4 2001-07-23T11:43:00 ... ZEP 2001 6 28 8 33 0 2001-06-28T08:33:00Z 2001.4886472602739 276-99 1828.58 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167200 H4 2001-07-23T11:56:00 ... ZEP 2001 7 5 9 8 0 2001-07-05T09:08:00Z 2001.507891933029 4955-91 1824.1 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167201 H4 2001-08-01T15:23:00 ... ZEP 2001 7 5 9 8 0 2001-07-05T09:08:00Z 2001.507891933029 4956-91 1824.61 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167202 H4 2001-08-01T15:36:00 ... ZEP 2001 7 12 9 29 0 2001-07-12T09:29:00Z 2001.5271099695585 1475-91 1822.85 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167203 H4 2001-08-01T14:57:00 ... ZEP 2001 7 12 9 29 0 2001-07-12T09:29:00Z 2001.5271099695585 1476-91 1823.61 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167204 H4 2001-08-01T15:10:00 ... ZEP 2001 7 19 8 25 0 2001-07-19T08:25:00Z 2001.5461662861492 1603-91 1826.08 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167205 H4 2001-08-15T14:34:00 ... ZEP 2001 7 19 8 25 0 2001-07-19T08:25:00Z 2001.5461662861492 1604-91 1826.94 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167206 H4 2001-08-15T14:47:00 ... ZEP 2001 7 26 8 25 0 2001-07-26T08:25:00Z 2001.565344368341 265-99 1821.76 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167207 H4 2001-08-15T13:50:00 ... ZEP 2001 7 26 8 25 0 2001-07-26T08:25:00Z 2001.565344368341 266-99 1823.45 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167208 H4 2001-08-15T14:03:00 ... ZEP 2001 8 2 8 38 0 2001-08-02T08:38:00Z 2001.5845471841706 75-98 1829.07 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167209 H4 2001-09-07T13:12:00 ... ZEP 2001 8 2 8 38 0 2001-08-02T08:38:00Z 2001.5845471841706 76-98 1827.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167210 H4 2001-09-07T13:25:00 ... ZEP 2001 8 13 13 6 0 2001-08-13T13:06:00Z 2001.615194063927 987-91 1836.89 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167211 H4 2001-09-07T13:38:00 ... ZEP 2001 8 13 13 6 0 2001-08-13T13:06:00Z 2001.615194063927 988-91 1837.65 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167212 H4 2001-09-07T13:51:00 ... ZEP 2001 8 16 8 16 0 2001-08-16T08:16:00Z 2001.6228614916286 1845-91 1829.71 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167213 H4 2001-10-18T14:44:00 ... ZEP 2001 8 16 8 16 0 2001-08-16T08:16:00Z 2001.6228614916286 1846-91 1830.76 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167214 H4 2001-10-18T14:57:00 ... ZEP 2001 8 23 8 46 0 2001-08-23T08:46:00Z 2001.6420966514459 4279-91 1828.66 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167215 H4 2001-10-18T15:10:00 ... ZEP 2001 8 23 8 46 0 2001-08-23T08:46:00Z 2001.6420966514459 4280-91 1830.52 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167216 H4 2001-10-18T15:23:00 ... ZEP 2001 8 30 8 33 0 2001-08-30T08:33:00Z 2001.66125 4475-91 1865.2 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167217 H4 2001-10-18T15:36:00 ... ZEP 2001 8 30 8 33 0 2001-08-30T08:33:00Z 2001.66125 4476-91 1862.63 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167218 H4 2001-10-18T15:50:00 ... ZEP 2001 9 6 7 43 0 2001-09-06T07:43:00Z 2001.680332952816 369-91 1875.26 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167219 H4 2001-10-18T16:31:00 ... ZEP 2001 9 6 7 43 0 2001-09-06T07:43:00Z 2001.680332952816 370-91 1874.41 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167220 H4 2001-10-18T16:44:00 ... ZEP 2001 9 13 8 55 0 2001-09-13T08:55:00Z 2001.699648021309 4990-91 1839.95 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167221 H4 2001-10-18T16:03:00 ... ZEP 2001 9 14 8 13 0 2001-09-14T08:13:00Z 2001.7023078386605 65-98 1867.95 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167222 H4 2001-10-18T14:07:00 ... ZEP 2001 9 14 8 13 0 2001-09-14T08:13:00Z 2001.7023078386605 66-98 1866.81 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167223 H4 2001-10-18T14:20:00 ... ZEP 2001 9 29 9 0 0 2001-09-29T09:00:00Z 2001.743493150685 267-99 1851.1 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167224 H4 2001-10-24T13:49:00 ... ZEP 2001 9 29 9 0 0 2001-09-29T09:00:00Z 2001.743493150685 268-99 1851.08 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167225 H4 2001-10-24T14:02:00 ... ZEP 2001 10 4 8 43 0 2001-10-04T08:43:00Z 2001.7571594368342 300-99 1834.26 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167226 H4 2001-10-24T16:20:00 ... ZEP 2001 10 11 8 40 0 2001-10-11T08:40:00Z 2001.7763318112634 4083-91 1827.7 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167227 H4 2001-11-27T12:36:00 C.. ZEP 2001 10 11 8 40 0 2001-10-11T08:40:00Z 2001.7763318112634 4084-91 1795.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167228 H4 2001-11-27T12:49:00 C.. ZEP 2001 10 18 8 35 0 2001-10-18T08:35:00Z 2001.7955003805175 4529-91 1851.11 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167229 H4 2001-11-27T12:10:00 ... ZEP 2001 10 18 8 35 0 2001-10-18T08:35:00Z 2001.7955003805175 4530-91 1850.78 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167230 H4 2001-11-27T12:23:00 ... ZEP 2001 10 26 14 40 0 2001-10-26T14:40:00Z 2001.818112633181 157-99 1854.42 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167231 H4 2001-11-27T15:16:00 ... ZEP 2001 11 1 9 42 0 2001-11-01T09:42:00Z 2001.8339840182648 251-99 1857.96 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167232 H4 2001-11-27T11:44:00 ... ZEP 2001 11 1 9 42 0 2001-11-01T09:42:00Z 2001.8339840182648 252-99 1858.35 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167233 H4 2001-11-27T11:57:00 ... ZEP 2001 11 8 9 5 0 2001-11-08T09:05:00Z 2001.8530917047185 4181-91 1878.76 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167234 H4 2001-12-10T11:06:00 ... ZEP 2001 11 8 9 5 0 2001-11-08T09:05:00Z 2001.8530917047185 4182-91 1878.21 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167235 H4 2001-12-10T11:19:00 ... ZEP 2001 11 15 9 0 0 2001-11-15T09:00:00Z 2001.8722602739726 4187-91 1896.38 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167236 H4 2001-12-10T11:58:00 ... ZEP 2001 11 15 9 0 0 2001-11-15T09:00:00Z 2001.8722602739726 4188-91 1895.66 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167237 H4 2001-12-10T12:11:00 ... ZEP 2001 11 22 9 50 0 2001-11-22T09:50:00Z 2001.8915334855403 339-91 1884.62 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167238 H4 2002-01-08T15:56:00 ... ZEP 2001 11 22 9 50 0 2001-11-22T09:50:00Z 2001.8915334855403 340-91 1883.64 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167239 H4 2002-01-08T16:09:00 ... ZEP 2001 11 29 12 34 56 2001-11-29T12:34:56Z 2001.9110253678336 813-91 1870.57 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167240 H4 2002-01-08T16:22:00 ... ZEP 2001 11 29 12 34 56 2001-11-29T12:34:56Z 2001.9110253678336 814-91 1871.01 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167241 H4 2002-01-08T16:35:00 ... ZEP 2001 12 6 9 35 0 2001-12-06T09:35:00Z 2001.9298611111112 803-91 1853.98 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167242 H4 2002-01-09T10:54:00 ... ZEP 2001 12 6 9 35 0 2001-12-06T09:35:00Z 2001.9298611111112 804-91 1852.91 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167243 H4 2002-01-09T11:07:00 ... ZEP 2001 12 13 8 35 0 2001-12-13T08:35:00Z 2001.9489250380518 4595-91 1861.34 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167244 H4 2002-01-30T13:59:00 ... ZEP 2001 12 13 8 35 0 2001-12-13T08:35:00Z 2001.9489250380518 4596-91 1860.72 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167245 H4 2002-01-30T14:13:00 ... ZEP 2001 12 20 9 50 0 2001-12-20T09:50:00Z 2001.9682458143075 4103-91 1909.42 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167246 H4 2002-01-30T17:03:00 ... ZEP 2001 12 20 9 50 0 2001-12-20T09:50:00Z 2001.9682458143075 4104-91 1909.65 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167247 H4 2002-01-30T17:16:00 ... ZEP 2001 12 27 13 42 0 2001-12-27T13:42:00Z 2001.9878652968036 4703-91 1874.0 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167248 H4 2002-01-24T16:19:00 ... ZEP 2001 12 27 13 42 0 2001-12-27T13:42:00Z 2001.9878652968036 4704-91 1870.82 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167249 H4 2002-01-24T16:32:00 ... ZEP 2002 1 3 12 34 56 2002-01-03T12:34:56Z 2002.0069157787925 4095-91 1857.3 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167250 H4 2002-01-24T14:58:00 ... ZEP 2002 1 3 12 34 56 2002-01-03T12:34:56Z 2002.0069157787925 4096-91 1856.77 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167251 H4 2002-01-24T15:11:00 ... ZEP 2002 1 10 10 0 0 2002-01-10T10:00:00Z 2002.025799086758 659-91 1859.0 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167252 H4 2002-01-31T16:41:00 ... ZEP 2002 1 10 10 0 0 2002-01-10T10:00:00Z 2002.025799086758 660-91 1859.26 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167253 H4 2002-01-31T16:55:00 ... ZEP 2002 1 17 9 50 0 2002-01-17T09:50:00Z 2002.0449581430746 1471-91 1886.58 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167254 H4 2002-02-20T15:42:00 ... ZEP 2002 1 17 9 50 0 2002-01-17T09:50:00Z 2002.0449581430746 1472-91 1886.06 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167255 H4 2002-02-20T15:55:00 ... ZEP 2002 1 25 10 30 0 2002-01-25T10:30:00Z 2002.0669520547945 1093-91 1895.0 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167256 H4 2002-02-20T15:16:00 ... ZEP 2002 1 25 10 30 0 2002-01-25T10:30:00Z 2002.0669520547945 1094-91 1892.57 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167257 H4 2002-02-20T15:29:00 ... ZEP 2002 1 31 9 50 0 2002-01-31T09:50:00Z 2002.083314307458 4025-91 1873.71 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167258 H4 2002-03-13T14:33:00 ... ZEP 2002 1 31 9 50 0 2002-01-31T09:50:00Z 2002.083314307458 4026-91 1872.21 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167259 H4 2002-03-13T14:46:00 ... ZEP 2002 2 7 9 34 0 2002-02-07T09:34:00Z 2002.1024619482496 1789-91 1879.64 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167260 H4 2002-03-13T14:59:00 ... ZEP 2002 2 7 9 34 0 2002-02-07T09:34:00Z 2002.1024619482496 1790-91 1878.23 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167261 H4 2002-03-13T15:12:00 ... ZEP 2002 2 15 9 2 0 2002-02-15T09:02:00Z 2002.1243188736682 1841-91 1864.93 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167262 H4 2002-03-14T11:07:00 ... ZEP 2002 2 15 9 2 0 2002-02-15T09:02:00Z 2002.1243188736682 1842-91 1862.88 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167263 H4 2002-03-14T11:20:00 ... ZEP 2002 2 21 9 4 0 2002-02-21T09:04:00Z 2002.1407610350077 4084-91 1886.86 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167264 H4 2002-03-18T15:59:00 ... ZEP 2002 2 21 9 54 0 2002-02-21T09:54:00Z 2002.1408561643836 853-91 1886.33 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167265 H4 2002-03-25T15:40:00 ... ZEP 2002 2 21 9 54 0 2002-02-21T09:54:00Z 2002.1408561643836 854-91 1884.6 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167266 H4 2002-03-25T15:53:00 ... ZEP 2002 2 28 12 34 56 2002-02-28T12:34:56Z 2002.1603404363268 1405-91 1873.38 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167267 H4 2002-03-25T16:06:00 ... ZEP 2002 2 28 12 34 56 2002-02-28T12:34:56Z 2002.1603404363268 1406-91 1872.01 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167268 H4 2002-03-25T16:19:00 ... ZEP 2002 3 10 11 30 0 2002-03-10T11:30:00Z 2002.1876141552511 161-99 1864.64 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167269 H4 2002-04-23T12:46:00 ... ZEP 2002 3 10 11 30 0 2002-03-10T11:30:00Z 2002.1876141552511 162-99 1863.88 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167270 H4 2002-04-23T12:59:00 ... ZEP 2002 3 15 10 25 0 2002-03-15T10:25:00Z 2002.2011891171994 181-99 1862.06 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167271 H4 2002-04-22T15:53:00 ... ZEP 2002 3 15 10 25 0 2002-03-15T10:25:00Z 2002.2011891171994 182-99 1862.17 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167272 H4 2002-04-22T16:06:00 ... ZEP 2002 3 18 9 20 0 2002-03-18T09:20:00Z 2002.2092846270928 4709-91 1883.87 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167273 H4 2002-07-08T08:50:00 C.. ZEP 2002 3 18 9 20 0 2002-03-18T09:20:00Z 2002.2092846270928 4710-91 1853.27 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167274 H4 2002-07-08T09:03:00 ... ZEP 2002 3 22 9 26 0 2002-03-22T09:26:00Z 2002.2202549467274 339-99 1856.23 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167275 H4 2002-04-23T11:54:00 ... ZEP 2002 3 22 9 26 0 2002-03-22T09:26:00Z 2002.2202549467274 340-99 1855.75 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167276 H4 2002-04-23T12:07:00 ... ZEP 2002 3 29 10 40 0 2002-03-29T10:40:00Z 2002.2395738203957 4835-98 1867.41 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167277 H4 2002-04-23T12:20:00 ... ZEP 2002 3 29 10 40 0 2002-03-29T10:40:00Z 2002.2395738203957 4836-98 1866.57 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167278 H4 2002-04-23T12:33:00 ... ZEP 2002 4 5 9 5 0 2002-04-05T09:05:00Z 2002.2585711567733 743-91 1862.79 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167279 H4 2002-05-24T11:18:00 ... ZEP 2002 4 5 9 5 0 2002-04-05T09:05:00Z 2002.2585711567733 744-91 1865.5 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167280 H4 2002-05-24T11:31:00 ... ZEP 2002 4 11 8 11 0 2002-04-11T08:11:00Z 2002.2749067732116 793-91 1859.56 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167281 H4 2002-05-24T10:50:00 ... ZEP 2002 4 11 8 11 0 2002-04-11T08:11:00Z 2002.2749067732116 794-91 1862.91 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167282 H4 2002-05-24T11:03:00 ... ZEP 2002 4 25 8 8 0 2002-04-25T08:08:00Z 2002.3132572298325 75-98 1857.73 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167283 H4 2002-06-06T16:04:00 ... ZEP 2002 4 25 8 8 0 2002-04-25T08:08:00Z 2002.3132572298325 76-98 1856.99 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167284 H4 2002-06-06T16:17:00 ... ZEP 2002 5 3 8 56 0 2002-05-03T08:56:00Z 2002.3352663622527 1123-91 -999.99 -999.999 78.9067 11.8883 479.0 474.0 5.0 P 167285 H4 2002-06-06T16:30:00 M.. ZEP 2002 5 3 8 56 0 2002-05-03T08:56:00Z 2002.3352663622527 1124-91 1573.02 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167286 H4 2002-06-06T16:44:00 C.. ZEP 2002 5 10 8 52 0 2002-05-10T08:52:00Z 2002.3544368340943 359-91 1847.31 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167287 H4 2002-06-06T16:57:00 ... ZEP 2002 5 10 8 52 0 2002-05-10T08:52:00Z 2002.3544368340943 360-91 1847.71 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167288 H4 2002-06-06T17:10:00 ... ZEP 2002 5 17 8 3 0 2002-05-17T08:03:00Z 2002.3735216894977 1055-91 1842.5 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167289 H4 2002-06-06T15:38:00 ... ZEP 2002 5 17 8 3 0 2002-05-17T08:03:00Z 2002.3735216894977 1056-91 1842.31 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167290 H4 2002-06-06T15:51:00 ... ZEP 2002 5 23 8 34 0 2002-05-23T08:34:00Z 2002.3900190258753 1967-91 1843.26 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167291 H4 2002-07-08T09:16:00 ... ZEP 2002 5 23 8 34 0 2002-05-23T08:34:00Z 2002.3900190258753 1968-91 1843.74 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167292 H4 2002-07-08T09:29:00 ... ZEP 2002 5 30 8 4 0 2002-05-30T08:04:00Z 2002.4091400304414 4893-91 1840.25 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167293 H4 2002-10-28T14:52:00 ... ZEP 2002 5 30 8 4 0 2002-05-30T08:04:00Z 2002.4091400304414 4894-91 1841.3 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167294 H4 2002-10-28T15:05:00 ... ZEP 2002 6 6 8 25 0 2002-06-06T08:25:00Z 2002.428358066971 35-91 1832.38 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167295 H4 2002-10-28T13:34:00 ... ZEP 2002 6 6 8 25 0 2002-06-06T08:25:00Z 2002.428358066971 36-91 1832.78 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167296 H4 2002-10-28T13:47:00 ... ZEP 2002 6 13 8 12 0 2002-06-13T08:12:00Z 2002.447511415525 4887-91 1830.06 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167297 H4 2002-07-22T11:04:00 ... ZEP 2002 6 13 8 12 0 2002-06-13T08:12:00Z 2002.447511415525 4888-91 1831.84 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167298 H4 2002-07-22T11:18:00 ... ZEP 2002 6 22 13 30 0 2002-06-22T13:30:00Z 2002.4727739726027 513-91 1821.04 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167299 H4 2002-07-22T10:37:00 ... ZEP 2002 6 22 13 30 0 2002-06-22T13:30:00Z 2002.4727739726027 514-91 1824.15 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167300 H4 2002-07-22T10:50:00 ... ZEP 2002 6 27 8 33 0 2002-06-27T08:33:00Z 2002.4859075342465 803-91 1825.67 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167301 H4 2002-07-24T16:29:00 ... ZEP 2002 6 27 8 33 0 2002-06-27T08:33:00Z 2002.4859075342465 804-91 1822.65 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167302 H4 2002-07-24T16:42:00 ... ZEP 2002 7 4 8 14 0 2002-07-04T08:14:00Z 2002.5050494672755 813-91 1824.11 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167303 H4 2002-07-24T15:37:00 ... ZEP 2002 7 4 8 14 0 2002-07-04T08:14:00Z 2002.5050494672755 814-91 1825.78 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167304 H4 2002-07-24T15:50:00 ... ZEP 2002 7 11 3 46 0 2002-07-11T03:46:00Z 2002.5237176560122 65-98 1821.09 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167305 H4 2002-08-12T09:26:00 ... ZEP 2002 7 11 3 46 0 2002-07-11T03:46:00Z 2002.5237176560122 66-98 1822.64 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167306 H4 2002-08-12T09:39:00 ... ZEP 2002 7 18 7 32 0 2002-07-18T07:32:00Z 2002.5433257229834 1215-91 1828.19 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167307 H4 2002-08-12T10:18:00 ... ZEP 2002 7 18 7 32 0 2002-07-18T07:32:00Z 2002.5433257229834 1216-91 1830.25 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167308 H4 2002-08-12T10:31:00 ... ZEP 2002 7 25 7 45 0 2002-07-25T07:45:00Z 2002.5625285388128 295-99 1838.92 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167309 H4 2002-08-26T15:48:00 ... ZEP 2002 7 25 7 45 0 2002-07-25T07:45:00Z 2002.5625285388128 296-99 1841.52 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167310 H4 2002-08-26T16:01:00 ... ZEP 2002 8 8 9 42 0 2002-08-08T09:42:00Z 2002.601107305936 531-99 1826.48 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167311 H4 2002-08-26T14:54:00 ... ZEP 2002 8 8 9 42 0 2002-08-08T09:42:00Z 2002.601107305936 532-99 1827.69 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167312 H4 2002-08-26T15:07:00 ... ZEP 2002 8 15 8 11 0 2002-08-15T08:11:00Z 2002.6201122526636 113-99 1838.29 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167313 H4 2002-09-19T12:10:00 ... ZEP 2002 8 15 8 11 0 2002-08-15T08:11:00Z 2002.6201122526636 114-99 1836.71 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167314 H4 2002-09-19T12:23:00 ... ZEP 2002 8 22 7 28 0 2002-08-22T07:28:00Z 2002.639208523592 261-99 1824.52 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167315 H4 2002-09-19T13:28:00 ... ZEP 2002 8 22 7 28 0 2002-08-22T07:28:00Z 2002.639208523592 262-99 1824.44 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167316 H4 2002-09-19T13:41:00 ... ZEP 2002 8 29 8 7 0 2002-08-29T08:07:00Z 2002.6584608066971 447-99 1830.36 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167317 H4 2002-10-03T16:14:00 ... ZEP 2002 8 29 8 7 0 2002-08-29T08:07:00Z 2002.6584608066971 448-99 1825.46 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167318 H4 2002-10-03T16:27:00 ... ZEP 2002 9 6 8 30 0 2002-09-06T08:30:00Z 2002.6804223744293 645-99 1842.03 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167319 H4 2002-10-03T16:40:00 ... ZEP 2002 9 6 8 30 0 2002-09-06T08:30:00Z 2002.6804223744293 646-99 1846.47 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167320 H4 2002-10-03T16:53:00 ... ZEP 2002 9 12 8 17 0 2002-09-12T08:17:00Z 2002.6968359969558 647-99 1839.57 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167321 H4 2002-12-09T10:04:00 ... ZEP 2002 9 12 8 17 0 2002-09-12T08:17:00Z 2002.6968359969558 648-99 1839.62 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167322 H4 2002-12-09T10:17:00 ... ZEP 2002 9 19 8 30 0 2002-09-19T08:30:00Z 2002.7160388127854 650-99 1850.39 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167323 H4 2002-12-09T12:03:00 ... ZEP 2002 9 26 7 32 0 2002-09-26T07:32:00Z 2002.735106544901 4029-91 1850.56 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167324 H4 2002-10-25T14:01:00 ... ZEP 2002 9 26 7 32 0 2002-09-26T07:32:00Z 2002.735106544901 4030-91 1852.05 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167325 H4 2002-10-25T14:14:00 ... ZEP 2002 10 3 8 30 0 2002-10-03T08:30:00Z 2002.7543949771689 4507-91 1862.89 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167326 H4 2002-10-25T13:34:00 ... ZEP 2002 10 3 8 30 0 2002-10-03T08:30:00Z 2002.7543949771689 4508-91 1861.89 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167327 H4 2002-10-25T13:47:00 ... ZEP 2002 10 10 8 44 0 2002-10-10T08:44:00Z 2002.773599695586 1992-91 1853.4 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167328 H4 2002-10-29T16:25:00 ... ZEP 2002 10 10 8 59 0 2002-10-10T08:59:00Z 2002.7736282343988 4657-91 1850.53 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167329 H4 2002-10-30T10:55:00 ... ZEP 2002 10 10 8 59 0 2002-10-10T08:59:00Z 2002.7736282343988 4658-91 1851.94 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167330 H4 2002-10-30T11:08:00 ... ZEP 2002 12 5 8 45 0 2002-12-05T08:45:00Z 2002.9270262557077 4071-91 1889.71 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167331 H4 2003-01-29T16:23:00 ... ZEP 2002 12 5 8 45 0 2002-12-05T08:45:00Z 2002.9270262557077 4072-91 1888.67 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167332 H4 2003-01-29T16:36:00 ... ZEP 2002 12 19 8 30 0 2002-12-19T08:30:00Z 2002.9653538812786 743-91 1927.25 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167333 H4 2003-02-03T09:59:00 .S. ZEP 2002 12 19 8 30 0 2002-12-19T08:30:00Z 2002.9653538812786 744-91 1927.17 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167334 H4 2003-02-03T10:12:00 .S. ZEP 2002 12 26 10 36 0 2002-12-26T10:36:00Z 2002.9847716894976 719-91 1857.03 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167335 H4 2003-02-07T10:57:00 ... ZEP 2002 12 26 10 36 0 2002-12-26T10:36:00Z 2002.9847716894976 720-91 1855.21 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167336 H4 2003-02-07T11:10:00 ... ZEP 2003 1 2 8 30 0 2003-01-02T08:30:00Z 2003.003710045662 4845-91 1851.06 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167337 H4 2003-02-07T12:17:00 ... ZEP 2003 1 2 8 30 0 2003-01-02T08:30:00Z 2003.003710045662 4846-91 1851.64 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167338 H4 2003-02-07T12:30:00 ... ZEP 2003 1 9 7 36 0 2003-01-09T07:36:00Z 2003.0227853881279 693-99 1881.85 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167339 H4 2003-02-06T16:51:00 ... ZEP 2003 1 9 7 36 0 2003-01-09T07:36:00Z 2003.0227853881279 694-99 1882.34 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167340 H4 2003-02-06T17:04:00 ... ZEP 2003 1 16 7 55 0 2003-01-16T07:55:00Z 2003.0419996194826 6217-66 1880.61 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167341 H4 2003-03-21T10:40:00 ... ZEP 2003 1 16 7 55 0 2003-01-16T07:55:00Z 2003.0419996194826 6218-66 1878.33 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167342 H4 2003-03-21T10:53:00 ... ZEP 2003 1 23 10 0 0 2003-01-23T10:00:00Z 2003.0614155251142 6261-66 1876.45 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167343 H4 2003-03-21T14:02:00 ... ZEP 2003 1 23 10 0 0 2003-01-23T10:00:00Z 2003.0614155251142 6262-66 1877.91 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167344 H4 2003-03-21T14:15:00 ... ZEP 2003 1 30 8 15 0 2003-01-30T08:15:00Z 2003.0803938356164 149-91 1917.51 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167345 H4 2003-05-08T08:59:00 .S. ZEP 2003 1 30 8 15 0 2003-01-30T08:15:00Z 2003.0803938356164 150-91 1917.44 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167346 H4 2003-05-08T09:12:00 .S. ZEP 2003 2 6 9 23 0 2003-02-06T09:23:00Z 2003.0997012937596 1997-91 1878.17 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167347 H4 2003-05-08T09:26:00 ... ZEP 2003 2 6 9 23 0 2003-02-06T09:23:00Z 2003.0997012937596 1998-91 1877.82 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167348 H4 2003-05-08T09:39:00 ... ZEP 2003 2 13 9 22 0 2003-02-13T09:22:00Z 2003.1188774733637 375-99 1875.62 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167349 H4 2003-03-25T17:23:00 ... ZEP 2003 2 27 7 58 0 2003-02-27T07:58:00Z 2003.1570738203957 485-91 1881.49 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167350 H4 2003-04-03T11:07:00 ... ZEP 2003 2 27 7 58 0 2003-02-27T07:58:00Z 2003.1570738203957 486-91 1880.32 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167351 H4 2003-04-03T11:20:00 ... ZEP 2003 3 13 13 55 0 2003-03-13T13:55:00Z 2003.1961092085237 219-99 1889.59 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167352 H4 2003-04-03T10:41:00 ... ZEP 2003 3 13 13 55 0 2003-03-13T13:55:00Z 2003.1961092085237 220-99 1889.53 1.4 78.9067 11.8883 479.0 474.0 5.0 P 167353 H4 2003-04-03T10:54:00 ... ZEP 2003 3 20 8 27 0 2003-03-20T08:27:00Z 2003.2146632420092 1127-91 1894.21 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167354 H4 2003-05-09T13:23:00 ... ZEP 2003 3 20 8 27 0 2003-03-20T08:27:00Z 2003.2146632420092 1128-91 1897.43 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167355 H4 2003-05-09T13:36:00 ... ZEP 2003 3 27 9 36 0 2003-03-27T09:36:00Z 2003.2339726027396 1029-91 1873.89 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167356 H4 2003-05-09T12:56:00 ... ZEP 2003 3 27 9 36 0 2003-03-27T09:36:00Z 2003.2339726027396 1030-91 1871.95 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167357 H4 2003-05-09T13:10:00 ... ZEP 2003 4 3 8 30 0 2003-04-03T08:30:00Z 2003.2530251141552 1051-99 1897.26 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167358 H4 2003-05-21T11:47:00 ... ZEP 2003 4 3 8 30 0 2003-04-03T08:30:00Z 2003.2530251141552 1052-99 1898.77 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167359 H4 2003-05-21T12:00:00 ... ZEP 2003 4 7 17 21 0 2003-04-07T17:21:00Z 2003.2649942922374 4781-91 1849.27 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167360 H4 2003-05-21T11:21:00 ... ZEP 2003 4 7 17 21 0 2003-04-07T17:21:00Z 2003.2649942922374 4782-91 1849.76 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167361 H4 2003-05-21T11:34:00 ... ZEP 2003 4 8 7 0 0 2003-04-08T07:00:00Z 2003.2665525114155 105-91 1858.38 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167362 H4 2003-05-14T10:51:00 ... ZEP 2003 4 8 7 0 0 2003-04-08T07:00:00Z 2003.2665525114155 106-91 1859.59 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167363 H4 2003-05-14T11:04:00 ... ZEP 2003 4 9 11 24 0 2003-04-09T11:24:00Z 2003.269794520548 6195-66 1868.76 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167364 H4 2003-05-14T11:43:00 ... ZEP 2003 4 9 11 24 0 2003-04-09T11:24:00Z 2003.269794520548 6196-66 1869.42 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167365 H4 2003-05-14T11:56:00 ... ZEP 2003 4 10 7 8 0 2003-04-10T07:08:00Z 2003.2720471841706 435-99 1866.51 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167366 H4 2003-05-09T14:27:00 ... ZEP 2003 4 10 7 8 0 2003-04-10T07:08:00Z 2003.2720471841706 436-99 1866.35 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167367 H4 2003-05-09T14:40:00 ... ZEP 2003 4 11 8 1 0 2003-04-11T08:01:00Z 2003.2748877473364 1373-91 1862.72 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167368 H4 2003-05-09T13:49:00 ... ZEP 2003 4 11 8 1 0 2003-04-11T08:01:00Z 2003.2748877473364 1374-91 1863.46 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167369 H4 2003-05-09T14:02:00 ... ZEP 2003 4 12 12 2 0 2003-04-12T12:02:00Z 2003.278085996956 487-99 1864.48 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167370 H4 2003-05-21T12:41:00 ... ZEP 2003 4 12 12 2 0 2003-04-12T12:02:00Z 2003.278085996956 488-99 1862.69 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167371 H4 2003-05-21T12:54:00 ... ZEP 2003 4 13 9 43 0 2003-04-13T09:43:00Z 2003.280561263318 1129-91 1891.83 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167372 H4 2003-05-21T13:07:00 ... ZEP 2003 4 13 9 43 0 2003-04-13T09:43:00Z 2003.280561263318 1130-91 1890.9 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167373 H4 2003-05-21T13:20:00 ... ZEP 2003 4 14 13 1 0 2003-04-14T13:01:00Z 2003.2836777016744 257-91 1881.08 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167374 H4 2003-05-14T13:03:00 ... ZEP 2003 4 14 13 1 0 2003-04-14T13:01:00Z 2003.2836777016744 258-91 1883.97 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167375 H4 2003-05-14T13:16:00 ... ZEP 2003 4 15 6 41 0 2003-04-15T06:41:00Z 2003.2856944444445 4933-91 1859.37 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167376 H4 2003-05-14T12:37:00 ... ZEP 2003 4 15 6 41 0 2003-04-15T06:41:00Z 2003.2856944444445 4934-91 1860.77 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167377 H4 2003-05-14T12:50:00 ... ZEP 2003 4 17 6 58 0 2003-04-17T06:58:00Z 2003.291206240487 4093-91 1866.35 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167378 H4 2003-05-28T11:19:00 ... ZEP 2003 4 17 6 58 0 2003-04-17T06:58:00Z 2003.291206240487 4094-91 1866.1 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167379 H4 2003-05-28T11:32:00 ... ZEP 2003 4 24 7 40 0 2003-04-24T07:40:00Z 2003.3104642313547 1567-91 1867.11 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167380 H4 2003-05-28T10:52:00 ... ZEP 2003 4 24 7 40 0 2003-04-24T07:40:00Z 2003.3104642313547 1568-91 1865.54 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167381 H4 2003-05-28T11:05:00 ... ZEP 2003 5 1 10 0 0 2003-05-01T10:00:00Z 2003.329908675799 2005-91 1863.85 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167382 H4 2003-06-11T10:07:00 ... ZEP 2003 5 1 10 0 0 2003-05-01T10:00:00Z 2003.329908675799 2006-91 1865.1 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167383 H4 2003-06-11T10:20:00 ... ZEP 2003 5 8 7 40 0 2003-05-08T07:40:00Z 2003.3488203957381 911-99 1875.37 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167384 H4 2003-06-11T10:35:00 ... ZEP 2003 5 8 7 40 0 2003-05-08T07:40:00Z 2003.3488203957381 912-99 1870.03 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167385 H4 2003-06-11T10:48:00 ... ZEP 2003 5 15 8 55 0 2003-05-15T08:55:00Z 2003.368141171994 4840-98 1858.99 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167386 H4 2003-08-15T16:11:00 ... ZEP 2003 5 22 7 0 0 2003-05-22T07:00:00Z 2003.387100456621 987-91 1850.59 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167387 H4 2003-08-15T16:24:00 ... ZEP 2003 5 22 7 20 0 2003-05-22T07:20:00Z 2003.3871385083714 1002-99 1855.26 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167388 H4 2003-06-11T09:27:00 ... ZEP 2003 5 22 7 20 0 2003-05-22T07:20:00Z 2003.3871385083714 1495-91 1856.05 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167389 H4 2003-06-11T09:14:00 ... ZEP 2003 5 27 7 57 0 2003-05-27T07:57:00Z 2003.4009075342465 1747-91 1852.36 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167390 H4 2003-06-25T14:29:00 ... ZEP 2003 5 27 7 57 0 2003-05-27T07:57:00Z 2003.4009075342465 1748-91 1851.8 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167391 H4 2003-06-25T14:42:00 ... ZEP 2003 5 29 10 35 0 2003-05-29T10:35:00Z 2003.4066875951294 1093-91 1854.94 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167392 H4 2003-06-25T14:55:00 ... ZEP 2003 5 29 10 35 0 2003-05-29T10:35:00Z 2003.4066875951294 1094-91 1854.47 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167393 H4 2003-06-25T15:08:00 ... ZEP 2003 6 5 6 35 0 2003-06-05T06:35:00Z 2003.4254090563165 1925-91 1850.44 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167394 H4 2003-07-08T10:52:00 ... ZEP 2003 6 5 6 35 0 2003-06-05T06:35:00Z 2003.4254090563165 1926-91 1848.79 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167395 H4 2003-07-08T11:05:00 ... ZEP 2003 6 12 10 20 0 2003-06-12T10:20:00Z 2003.4450152207 1435-91 1848.96 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167396 H4 2003-07-08T10:26:00 ... ZEP 2003 6 12 10 20 0 2003-06-12T10:20:00Z 2003.4450152207 1436-91 1849.38 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167397 H4 2003-07-08T10:39:00 ... ZEP 2003 6 19 7 50 0 2003-06-19T07:50:00Z 2003.4639079147641 335-99 1840.5 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167398 H4 2003-07-16T13:52:00 ... ZEP 2003 6 19 7 50 0 2003-06-19T07:50:00Z 2003.4639079147641 336-99 1838.93 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167399 H4 2003-07-16T14:05:00 ... ZEP 2003 6 26 7 58 0 2003-06-26T07:58:00Z 2003.483101217656 401-99 1835.98 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167400 H4 2003-07-16T14:18:00 ... ZEP 2003 6 26 7 58 0 2003-06-26T07:58:00Z 2003.483101217656 402-99 1837.05 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167401 H4 2003-07-16T14:31:00 ... ZEP 2003 7 3 7 12 0 2003-07-03T07:12:00Z 2003.502191780822 813-91 1847.86 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167402 H4 2003-08-04T14:17:00 ... ZEP 2003 7 11 7 59 0 2003-07-11T07:59:00Z 2003.5241990106545 803-91 1842.55 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167403 H4 2003-08-01T14:26:00 ... ZEP 2003 7 11 7 59 0 2003-07-11T07:59:00Z 2003.5241990106545 804-91 1840.51 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167404 H4 2003-08-01T14:39:00 ... ZEP 2003 7 17 7 30 0 2003-07-17T07:30:00Z 2003.540582191781 4789-91 1835.65 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167405 H4 2003-08-15T11:36:00 ... ZEP 2003 7 17 7 30 0 2003-07-17T07:30:00Z 2003.540582191781 4790-91 1837.82 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167406 H4 2003-08-15T11:49:00 ... ZEP 2003 7 24 8 6 0 2003-07-24T08:06:00Z 2003.5598287671232 97-91 1832.15 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167407 H4 2003-08-15T12:02:00 ... ZEP 2003 7 24 8 6 0 2003-07-24T08:06:00Z 2003.5598287671232 98-91 1829.96 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167408 H4 2003-08-15T12:15:00 ... ZEP 2003 7 31 7 58 0 2003-07-31T07:58:00Z 2003.5789916286149 45-98 1844.12 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167409 H4 2003-10-06T10:09:00 ... ZEP 2003 7 31 7 58 0 2003-07-31T07:58:00Z 2003.5789916286149 46-98 1840.67 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167410 H4 2003-10-06T10:22:00 ... ZEP 2003 8 7 7 16 0 2003-08-07T07:16:00Z 2003.598089802131 189-99 1843.37 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167411 H4 2003-10-06T12:23:00 ... ZEP 2003 8 7 7 16 0 2003-08-07T07:16:00Z 2003.598089802131 190-99 1846.68 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167412 H4 2003-10-06T12:36:00 ... ZEP 2003 8 14 8 25 0 2003-08-14T08:25:00Z 2003.6173991628616 2051-91 1833.31 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167413 H4 2003-10-01T18:37:00 ... ZEP 2003 8 14 8 25 0 2003-08-14T08:25:00Z 2003.6173991628616 2052-91 1837.05 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167414 H4 2003-10-01T18:50:00 ... ZEP 2003 8 21 7 55 0 2003-08-21T07:55:00Z 2003.6365201674278 4413-91 1839.98 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167415 H4 2003-10-01T19:03:00 ... ZEP 2003 8 21 7 55 0 2003-08-21T07:55:00Z 2003.6365201674278 4414-91 1844.15 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167416 H4 2003-10-01T19:16:00 ... ZEP 2003 8 28 13 36 0 2003-08-28T13:36:00Z 2003.6563470319634 987-99 1847.18 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167417 H4 2003-10-01T11:57:00 ... ZEP 2003 8 28 13 36 0 2003-08-28T13:36:00Z 2003.6563470319634 988-99 1846.8 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167418 H4 2003-10-01T12:10:00 ... ZEP 2003 9 4 7 36 0 2003-09-04T07:36:00Z 2003.6748401826485 651-99 1849.48 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167419 H4 2003-10-01T13:17:00 ... ZEP 2003 9 4 7 36 0 2003-09-04T07:36:00Z 2003.6748401826485 652-99 1848.79 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167420 H4 2003-10-01T13:30:00 ... ZEP 2003 9 11 7 39 0 2003-09-11T07:39:00Z 2003.6940239726027 6605-66 1843.74 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167421 H4 2003-10-07T13:12:00 ... ZEP 2003 9 11 7 39 0 2003-09-11T07:39:00Z 2003.6940239726027 6606-66 1842.89 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167422 H4 2003-10-07T13:25:00 ... ZEP 2003 9 18 7 24 0 2003-09-18T07:24:00Z 2003.7131735159817 6527-66 1860.03 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167423 H4 2003-10-07T11:54:00 ... ZEP 2003 9 18 7 24 0 2003-09-18T07:24:00Z 2003.7131735159817 6528-66 1859.5 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167424 H4 2003-10-07T12:07:00 ... ZEP 2003 9 25 7 57 0 2003-09-25T07:57:00Z 2003.7324143835617 1857-99 1876.11 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167425 H4 2003-10-30T11:49:00 ... ZEP 2003 9 25 7 57 0 2003-09-25T07:57:00Z 2003.7324143835617 1858-99 1874.01 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167426 H4 2003-10-30T12:02:00 ... ZEP 2003 9 26 11 47 0 2003-09-26T11:47:00Z 2003.7355917047184 1835-99 1862.6 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167427 H4 2003-10-30T12:15:00 ... ZEP 2003 9 26 11 47 0 2003-09-26T11:47:00Z 2003.7355917047184 1836-99 1865.06 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167428 H4 2003-10-30T12:28:00 ... ZEP 2003 9 27 11 58 0 2003-09-27T11:58:00Z 2003.7383523592084 743-91 1865.24 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167429 H4 2003-11-11T10:19:00 ... ZEP 2003 9 27 11 58 0 2003-09-27T11:58:00Z 2003.7383523592084 744-91 1861.86 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167430 H4 2003-11-11T10:32:00 ... ZEP 2003 9 28 15 6 0 2003-09-28T15:06:00Z 2003.7414497716895 4411-91 1867.16 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167431 H4 2003-11-11T09:53:00 ... ZEP 2003 9 28 15 6 0 2003-09-28T15:06:00Z 2003.7414497716895 4412-91 1865.42 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167432 H4 2003-11-11T10:06:00 ... ZEP 2003 9 29 12 38 0 2003-09-29T12:38:00Z 2003.7439079147641 1005-91 1864.65 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167433 H4 2003-11-11T10:47:00 ... ZEP 2003 9 29 12 38 0 2003-09-29T12:38:00Z 2003.7439079147641 1006-91 1863.02 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167434 H4 2003-11-11T11:00:00 ... ZEP 2003 9 30 7 5 0 2003-09-30T07:05:00Z 2003.7460140791477 603-91 1864.67 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167435 H4 2003-11-11T09:27:00 ... ZEP 2003 9 30 7 5 0 2003-09-30T07:05:00Z 2003.7460140791477 604-91 1863.17 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167436 H4 2003-11-11T09:40:00 ... ZEP 2003 10 1 8 53 0 2003-10-01T08:53:00Z 2003.748959284627 1613-99 1865.5 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167437 H4 2003-10-31T16:13:00 ... ZEP 2003 10 1 8 53 0 2003-10-01T08:53:00Z 2003.748959284627 1614-99 1865.65 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167438 H4 2003-10-31T16:26:00 ... ZEP 2003 10 2 7 14 0 2003-10-02T07:14:00Z 2003.7515106544902 1611-99 1865.36 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167439 H4 2003-11-03T10:02:00 ... ZEP 2003 10 2 7 14 0 2003-10-02T07:14:00Z 2003.7515106544902 1612-99 1863.89 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167440 H4 2003-11-03T10:15:00 ... ZEP 2003 10 9 7 59 0 2003-10-09T07:59:00Z 2003.7707743531203 451-91 1861.49 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167441 H4 2003-11-06T13:06:00 ... ZEP 2003 10 9 7 59 0 2003-10-09T07:59:00Z 2003.7707743531203 452-91 1859.78 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167442 H4 2003-11-06T13:19:00 ... ZEP 2003 10 16 7 2 0 2003-10-16T07:02:00Z 2003.7898439878234 4753-91 1870.31 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167443 H4 2003-11-06T13:32:00 ... ZEP 2003 10 16 7 2 0 2003-10-16T07:02:00Z 2003.7898439878234 4754-91 1865.88 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167444 H4 2003-11-06T13:45:00 ... ZEP 2003 10 23 8 11 0 2003-10-23T08:11:00Z 2003.809153348554 495-91 1856.87 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167445 H4 2003-11-26T10:59:00 ... ZEP 2003 10 23 8 11 0 2003-10-23T08:11:00Z 2003.809153348554 496-91 1857.99 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167446 H4 2003-11-26T11:12:00 ... ZEP 2003 10 30 9 50 0 2003-10-30T09:50:00Z 2003.8285197869102 65-98 1881.22 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167447 H4 2003-11-26T11:25:00 ... ZEP 2003 10 30 9 50 0 2003-10-30T09:50:00Z 2003.8285197869102 66-98 1881.98 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167448 H4 2003-11-26T11:38:00 ... ZEP 2003 11 6 8 10 0 2003-11-06T08:10:00Z 2003.84750761035 793-91 1902.59 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167449 H4 2003-12-10T17:04:00 ... ZEP 2003 11 6 8 10 0 2003-11-06T08:10:00Z 2003.84750761035 794-91 1901.65 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167450 H4 2003-12-10T17:17:00 ... ZEP 2003 11 13 9 11 0 2003-11-13T09:11:00Z 2003.8668017503805 803-91 1863.58 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167451 H4 2003-12-10T17:32:00 ... ZEP 2003 11 13 9 11 0 2003-11-13T09:11:00Z 2003.8668017503805 804-91 1865.9 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167452 H4 2003-12-10T17:45:00 ... ZEP 2003 11 20 13 31 0 2003-11-20T13:31:00Z 2003.8864745053272 6383-66 1875.58 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167453 H4 2003-12-29T10:13:00 ... ZEP 2003 11 20 13 31 0 2003-11-20T13:31:00Z 2003.8864745053272 6384-66 1874.28 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167454 H4 2003-12-29T10:26:00 ... ZEP 2003 11 27 9 0 0 2003-11-27T09:00:00Z 2003.9051369863014 2073-99 1877.5 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167455 H4 2003-12-29T10:41:00 ... ZEP 2003 11 27 9 0 0 2003-11-27T09:00:00Z 2003.9051369863014 2074-99 1878.3 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167456 H4 2003-12-29T10:54:00 ... ZEP 2003 12 4 8 25 0 2003-12-04T08:25:00Z 2003.92424847793 159-98 1877.46 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167457 H4 2004-01-15T17:38:00 ... ZEP 2003 12 4 8 25 0 2003-12-04T08:25:00Z 2003.92424847793 160-98 1876.44 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167458 H4 2004-01-15T17:51:00 ... ZEP 2003 12 11 10 33 0 2003-12-11T10:33:00Z 2003.9436700913243 2173-99 1882.54 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167459 H4 2004-01-27T16:44:00 ... ZEP 2003 12 11 10 33 0 2003-12-11T10:33:00Z 2003.9436700913243 2174-99 1882.76 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167460 H4 2004-01-27T16:57:00 ... ZEP 2003 12 18 8 41 0 2003-12-18T08:41:00Z 2003.9626350837138 631-99 1891.5 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167461 H4 2004-01-15T18:04:00 ... ZEP 2003 12 18 8 41 0 2003-12-18T08:41:00Z 2003.9626350837138 632-99 1893.2 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167462 H4 2004-01-15T18:17:00 ... ZEP 2004 1 1 12 5 0 2004-01-01T12:05:00Z 2004.0013756071646 2025-99 1860.47 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167463 H4 2004-01-27T16:18:00 ... ZEP 2004 1 1 12 5 0 2004-01-01T12:05:00Z 2004.0013756071646 2026-99 1862.02 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167464 H4 2004-01-27T16:31:00 ... ZEP 2004 1 8 8 22 0 2004-01-08T08:22:00Z 2004.0200781724348 2357-99 1865.64 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167465 H4 2004-02-17T15:24:00 ... ZEP 2004 1 8 8 22 0 2004-01-08T08:22:00Z 2004.0200781724348 2358-99 1866.86 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167466 H4 2004-02-17T15:37:00 ... ZEP 2004 1 15 9 44 0 2004-01-15T09:44:00Z 2004.0393594414086 2355-99 1862.07 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167467 H4 2004-02-17T17:38:00 ... ZEP 2004 1 15 9 44 0 2004-01-15T09:44:00Z 2004.0393594414086 2356-99 1864.72 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167468 H4 2004-02-17T17:51:00 ... ZEP 2004 1 22 11 20 0 2004-01-22T11:20:00Z 2004.0586672738311 1687-91 1911.4 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167469 H4 2004-02-20T13:18:00 ... ZEP 2004 1 29 8 10 0 2004-01-29T08:10:00Z 2004.0774324529448 1769-91 1879.26 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167470 H4 2004-02-20T12:37:00 ... ZEP 2004 1 29 8 10 0 2004-01-29T08:10:00Z 2004.0774324529448 1770-91 1877.53 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167471 H4 2004-02-20T12:50:00 ... ZEP 2004 2 5 9 13 0 2004-02-05T09:13:00Z 2004.096677671524 2297-99 1916.57 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167472 H4 2004-03-01T18:26:00 .S. ZEP 2004 2 5 9 13 0 2004-02-05T09:13:00Z 2004.096677671524 2298-99 1913.92 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167473 H4 2004-03-01T18:39:00 .S. ZEP 2004 2 12 13 20 0 2004-02-12T13:20:00Z 2004.1162720097145 2293-99 1883.14 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167474 H4 2004-03-02T12:43:00 ... ZEP 2004 2 12 13 20 0 2004-02-12T13:20:00Z 2004.1162720097145 2294-99 1882.64 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167475 H4 2004-03-02T12:56:00 ... ZEP 2004 2 19 7 48 0 2004-02-19T07:48:00Z 2004.134767759563 1727-99 1870.77 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167476 H4 2004-04-01T17:00:00 ... ZEP 2004 2 19 7 48 0 2004-02-19T07:48:00Z 2004.134767759563 1728-99 1871.06 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167477 H4 2004-04-01T17:13:00 ... ZEP 2004 2 26 13 37 0 2004-02-26T13:37:00Z 2004.154555631451 1499-99 1869.39 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167478 H4 2004-04-01T17:26:00 ... ZEP 2004 2 26 13 37 0 2004-02-26T13:37:00Z 2004.154555631451 1500-99 1873.0 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167479 H4 2004-04-01T17:39:00 ... ZEP 2004 3 4 9 17 0 2004-03-04T09:17:00Z 2004.173187993321 2341-99 1893.54 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167480 H4 2004-04-01T09:46:00 ... ZEP 2004 3 4 9 17 0 2004-03-04T09:17:00Z 2004.173187993321 2342-99 1894.09 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167481 H4 2004-04-01T09:59:00 ... ZEP 2004 3 12 9 15 0 2004-03-12T09:15:00Z 2004.1950421220401 743-91 1870.71 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167482 H4 2004-04-01T10:12:00 ... ZEP 2004 3 12 9 15 0 2004-03-12T09:15:00Z 2004.1950421220401 744-91 1867.04 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167483 H4 2004-04-01T10:25:00 ... ZEP 2004 3 18 8 30 0 2004-03-18T08:30:00Z 2004.2113501821493 4333-91 1877.44 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167484 H4 2004-04-16T10:51:00 ... ZEP 2004 3 18 8 30 0 2004-03-18T08:30:00Z 2004.2113501821493 4334-91 1879.76 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167485 H4 2004-04-16T11:04:00 ... ZEP 2004 3 25 8 55 0 2004-03-25T08:55:00Z 2004.2305232999393 6369-66 1870.2 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167486 H4 2004-04-16T11:18:00 ... ZEP 2004 3 25 8 55 0 2004-03-25T08:55:00Z 2004.2305232999393 6370-66 1870.63 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167487 H4 2004-04-16T11:31:00 ... ZEP 2004 4 1 13 32 0 2004-04-01T13:32:00Z 2004.2501745598056 1183-99 1867.36 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167488 H4 2004-05-05T12:21:00 ... ZEP 2004 4 1 13 32 0 2004-04-01T13:32:00Z 2004.2501745598056 1184-99 1868.42 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167489 H4 2004-05-05T12:34:00 ... ZEP 2004 4 11 9 41 0 2004-04-11T09:41:00Z 2004.2770586672739 1939-99 1878.26 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167490 H4 2004-05-05T12:47:00 ... ZEP 2004 4 11 9 41 0 2004-04-11T09:41:00Z 2004.2770586672739 1940-99 1881.34 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167491 H4 2004-05-05T13:00:00 ... ZEP 2004 4 15 8 30 0 2004-04-15T08:30:00Z 2004.2878529143898 3115-99 1886.24 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167492 H4 2004-05-18T10:23:00 ... ZEP 2004 4 15 8 30 0 2004-04-15T08:30:00Z 2004.2878529143898 3116-99 1886.99 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167493 H4 2004-05-18T10:36:00 ... ZEP 2004 4 22 7 13 0 2004-04-22T07:13:00Z 2004.306832498482 3117-99 1861.15 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167494 H4 2004-05-18T09:55:00 ... ZEP 2004 4 22 7 13 0 2004-04-22T07:13:00Z 2004.306832498482 3118-99 1860.12 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167495 H4 2004-05-18T10:08:00 ... ZEP 2004 4 29 8 0 0 2004-04-29T08:00:00Z 2004.3260473588343 6035-66 1858.18 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167496 H4 2004-05-26T09:28:00 ... ZEP 2004 4 29 8 0 0 2004-04-29T08:00:00Z 2004.3260473588343 6036-66 1861.19 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167497 H4 2004-05-26T09:41:00 ... ZEP 2004 5 6 7 44 0 2004-05-06T07:44:00Z 2004.3451426836673 2937-99 1879.66 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167498 H4 2004-05-26T09:54:00 ... ZEP 2004 5 6 7 44 0 2004-05-06T07:44:00Z 2004.3451426836673 2938-99 1875.34 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167499 H4 2004-05-26T10:07:00 ... ZEP 2004 5 13 8 5 0 2004-05-13T08:05:00Z 2004.3643082119004 955-99 1851.49 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167500 H4 2004-07-08T12:33:00 ... ZEP 2004 5 13 8 5 0 2004-05-13T08:05:00Z 2004.3643082119004 956-99 1849.94 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167501 H4 2004-07-08T12:46:00 ... ZEP 2004 5 20 17 36 0 2004-05-20T17:36:00Z 2004.3845173041893 1613-99 1853.06 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167502 H4 2004-07-08T12:07:00 ... ZEP 2004 5 20 17 36 0 2004-05-20T17:36:00Z 2004.3845173041893 1614-99 1852.96 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167503 H4 2004-07-08T12:20:00 ... ZEP 2004 5 24 9 37 0 2004-05-24T09:37:00Z 2004.3945374165148 3257-99 1843.15 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167504 H4 2004-08-03T11:55:00 ... ZEP 2004 5 24 9 37 0 2004-05-24T09:37:00Z 2004.3945374165148 3258-99 1841.94 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167505 H4 2004-08-03T12:08:00 ... ZEP 2004 5 27 11 15 0 2004-05-27T11:15:00Z 2004.4029200819673 2717-99 1848.3 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167506 H4 2004-07-26T11:08:00 ... ZEP 2004 5 27 11 15 0 2004-05-27T11:15:00Z 2004.4029200819673 2718-99 1848.5 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167507 H4 2004-07-26T11:21:00 ... ZEP 2004 6 3 6 35 0 2004-06-03T06:35:00Z 2004.4215144960535 2757-99 1844.72 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167508 H4 2004-07-26T11:36:00 ... ZEP 2004 6 3 6 35 0 2004-06-03T06:35:00Z 2004.4215144960535 2758-99 1845.79 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167509 H4 2004-07-26T11:49:00 ... ZEP 2004 6 10 8 37 0 2004-06-10T08:37:00Z 2004.4408716605951 633-99 1840.02 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167510 H4 2004-07-07T10:23:00 ... ZEP 2004 6 10 8 37 0 2004-06-10T08:37:00Z 2004.4408716605951 634-99 1838.94 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167511 H4 2004-07-07T10:36:00 ... ZEP 2004 6 17 6 50 0 2004-06-17T06:50:00Z 2004.4597943230115 6161-66 1841.79 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167512 H4 2004-07-07T09:55:00 ... ZEP 2004 6 17 6 50 0 2004-06-17T06:50:00Z 2004.4597943230115 6162-66 1841.54 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167513 H4 2004-07-07T10:09:00 ... ZEP 2004 7 1 8 30 0 2004-07-01T08:30:00Z 2004.498235428051 3255-99 1840.91 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167514 H4 2004-08-03T12:21:00 ... ZEP 2004 7 1 8 30 0 2004-07-01T08:30:00Z 2004.498235428051 3256-99 1837.85 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167515 H4 2004-08-03T12:34:00 ... ZEP 2004 7 8 6 59 0 2004-07-08T06:59:00Z 2004.5171884486947 743-91 1826.79 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167516 H4 2004-08-12T14:53:00 ... ZEP 2004 7 8 6 59 0 2004-07-08T06:59:00Z 2004.5171884486947 744-91 1826.12 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167517 H4 2004-08-12T15:06:00 ... ZEP 2004 7 15 8 35 0 2004-07-15T08:35:00Z 2004.5364962811173 1855-99 1834.81 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167518 H4 2004-08-12T13:31:00 ... ZEP 2004 7 15 8 35 0 2004-07-15T08:35:00Z 2004.5364962811173 1856-99 1832.5 1.87 78.9067 11.8883 479.0 474.0 5.0 P 167519 H4 2004-08-12T13:44:00 ... ZEP 2004 7 22 12 50 0 2004-07-22T12:50:00Z 2004.5561057984214 1129-99 1836.47 1.87 78.9067 11.8883 479.0 474.0 5.0 P 188784 H4 2004-09-30T13:02:00 ... ZEP 2004 7 22 12 50 0 2004-07-22T12:50:00Z 2004.5561057984214 1130-99 1836.67 1.87 78.9067 11.8883 479.0 474.0 5.0 P 188785 H4 2004-09-30T13:16:00 ... ZEP 2004 7 27 10 34 0 2004-07-27T10:34:00Z 2004.569508955677 1007-99 1857.35 1.87 78.9067 11.8883 479.0 474.0 5.0 P 188782 H4 2004-09-30T12:34:00 ... ZEP 2004 7 27 10 34 0 2004-07-27T10:34:00Z 2004.569508955677 1008-99 1857.6 1.87 78.9067 11.8883 479.0 474.0 5.0 P 188783 H4 2004-09-30T12:48:00 ... ZEP 2004 7 30 10 21 0 2004-07-30T10:21:00Z 2004.577681010929 2777-99 1828.83 1.87 78.9067 11.8883 479.0 474.0 5.0 P 188786 H4 2004-09-30T12:06:00 ... ZEP 2004 7 30 10 21 0 2004-07-30T10:21:00Z 2004.577681010929 2778-99 1828.75 1.87 78.9067 11.8883 479.0 474.0 5.0 P 188787 H4 2004-09-30T12:20:00 ... ZEP 2004 8 5 7 38 0 2004-08-05T07:38:00Z 2004.5937651791135 709-99 1837.43 1.87 78.9067 11.8883 479.0 474.0 5.0 P 188780 H4 2004-09-30T13:31:00 ... ZEP 2004 8 5 7 38 0 2004-08-05T07:38:00Z 2004.5937651791135 710-99 1834.93 1.87 78.9067 11.8883 479.0 474.0 5.0 P 188781 H4 2004-09-30T13:45:00 ... ZEP 2004 8 12 7 12 0 2004-08-12T07:12:00Z 2004.6128415300545 803-91 1822.57 1.87 78.9067 11.8883 479.0 474.0 5.0 P 188975 H4 2004-10-04T17:32:00 ... ZEP 2004 8 12 7 12 0 2004-08-12T07:12:00Z 2004.6128415300545 804-91 1822.19 1.87 78.9067 11.8883 479.0 474.0 5.0 P 188976 H4 2004-10-04T17:46:00 ... ZEP 2004 8 18 7 15 0 2004-08-18T07:15:00Z 2004.6292406648452 793-91 1829.67 1.87 78.9067 11.8883 479.0 474.0 5.0 P 188973 H4 2004-10-04T18:00:00 ... ZEP 2004 8 18 7 15 0 2004-08-18T07:15:00Z 2004.6292406648452 794-91 1831.07 1.87 78.9067 11.8883 479.0 474.0 5.0 P 188974 H4 2004-10-04T18:15:00 ... ZEP 2004 8 26 7 35 0 2004-08-26T07:35:00Z 2004.6511365361264 3487-99 1829.84 1.87 78.9067 11.8883 479.0 474.0 5.0 P 189645 H4 2004-10-07T18:26:00 ... ZEP 2004 8 26 7 35 0 2004-08-26T07:35:00Z 2004.6511365361264 3488-99 1830.27 1.87 78.9067 11.8883 479.0 474.0 5.0 P 189646 H4 2004-10-07T18:40:00 ... ZEP 2004 9 9 7 25 0 2004-09-09T07:25:00Z 2004.6893689283545 1911-99 1850.82 1.87 78.9067 11.8883 479.0 474.0 5.0 P 189643 H4 2004-10-07T18:54:00 ... ZEP 2004 9 9 7 25 0 2004-09-09T07:25:00Z 2004.6893689283545 1912-99 1848.65 1.87 78.9067 11.8883 479.0 474.0 5.0 P 189644 H4 2004-10-07T19:08:00 ... ZEP 2004 9 16 10 14 0 2004-09-16T10:14:00Z 2004.7088152701883 3903-99 1851.95 1.87 78.9067 11.8883 479.0 474.0 5.0 P 190677 H4 2004-11-01T16:11:00 ... ZEP 2004 9 16 10 14 0 2004-09-16T10:14:00Z 2004.7088152701883 3904-99 1854.7 1.87 78.9067 11.8883 479.0 474.0 5.0 P 190678 H4 2004-11-01T16:25:00 ... ZEP 2004 9 23 7 30 0 2004-09-23T07:30:00Z 2004.7276297814208 3895-99 1859.57 1.87 78.9067 11.8883 479.0 474.0 5.0 P 190675 H4 2004-11-01T15:30:00 ... ZEP 2004 9 23 7 30 0 2004-09-23T07:30:00Z 2004.7276297814208 3896-99 1861.03 1.87 78.9067 11.8883 479.0 474.0 5.0 P 190676 H4 2004-11-01T15:44:00 ... ZEP 2004 9 30 7 30 0 2004-09-30T07:30:00Z 2004.7467554644809 3749-99 1856.11 1.87 78.9067 11.8883 479.0 474.0 5.0 P 191179 H4 2004-11-05T09:14:00 ... ZEP 2004 9 30 7 30 0 2004-09-30T07:30:00Z 2004.7467554644809 3750-99 1855.67 1.87 78.9067 11.8883 479.0 474.0 5.0 P 191178 H4 2004-11-05T09:29:00 ... ZEP 2004 10 8 13 32 0 2004-10-08T13:32:00Z 2004.7693002428657 285-99 1865.24 1.87 78.9067 11.8883 479.0 474.0 5.0 P 191176 H4 2004-11-05T09:43:00 ... ZEP 2004 10 8 13 32 0 2004-10-08T13:32:00Z 2004.7693002428657 286-99 1864.77 1.87 78.9067 11.8883 479.0 474.0 5.0 P 191177 H4 2004-11-05T09:57:00 ... ZEP 2004 10 14 7 50 0 2004-10-14T07:50:00Z 2004.7850447783849 2647-99 1857.94 1.87 78.9067 11.8883 479.0 474.0 5.0 P 191598 H4 2004-11-15T09:05:00 ... ZEP 2004 10 14 7 50 0 2004-10-14T07:50:00Z 2004.7850447783849 2648-99 1858.26 1.87 78.9067 11.8883 479.0 474.0 5.0 P 191599 H4 2004-11-15T09:19:00 ... ZEP 2004 10 21 8 40 0 2004-10-21T08:40:00Z 2004.8042653309046 1791-99 1850.63 1.87 78.9067 11.8883 479.0 474.0 5.0 P 191596 H4 2004-11-15T10:30:00 ... ZEP 2004 10 21 8 40 0 2004-10-21T08:40:00Z 2004.8042653309046 1792-99 1849.36 1.87 78.9067 11.8883 479.0 474.0 5.0 P 191597 H4 2004-11-15T10:44:00 ... ZEP 2004 10 29 8 33 0 2004-10-29T08:33:00Z 2004.8261099726776 2197-99 1850.94 1.87 78.9067 11.8883 479.0 474.0 5.0 P 192177 H4 2004-11-30T16:16:00 ... ZEP 2004 10 29 8 33 0 2004-10-29T08:33:00Z 2004.8261099726776 2198-99 1851.07 1.87 78.9067 11.8883 479.0 474.0 5.0 P 192178 H4 2004-11-30T16:30:00 ... ZEP 2004 11 4 8 20 0 2004-11-04T08:20:00Z 2004.842478749241 1485-99 1858.07 1.87 78.9067 11.8883 479.0 474.0 5.0 P 192175 H4 2004-11-30T16:45:00 ... ZEP 2004 11 4 8 20 0 2004-11-04T08:20:00Z 2004.842478749241 1486-99 1856.88 1.87 78.9067 11.8883 479.0 474.0 5.0 P 192176 H4 2004-11-30T17:00:00 ... ZEP 2004 11 11 8 55 0 2004-11-11T08:55:00Z 2004.861670840923 803-91 1880.23 1.87 78.9067 11.8883 479.0 474.0 5.0 P 192477 H4 2004-12-02T19:04:00 ... ZEP 2004 11 11 8 55 0 2004-11-11T08:55:00Z 2004.861670840923 804-91 1879.54 1.87 78.9067 11.8883 479.0 474.0 5.0 P 192478 H4 2004-12-02T19:18:00 ... ZEP 2004 11 18 9 52 0 2004-11-18T09:52:00Z 2004.880904675167 793-91 1858.49 1.87 78.9067 11.8883 479.0 474.0 5.0 P 192475 H4 2004-12-02T18:36:00 ... ZEP 2004 11 18 9 52 0 2004-11-18T09:52:00Z 2004.880904675167 794-91 1860.77 1.87 78.9067 11.8883 479.0 474.0 5.0 P 192476 H4 2004-12-02T18:50:00 ... ZEP 2004 11 25 8 50 0 2004-11-25T08:50:00Z 2004.899912720097 1159-99 1865.46 1.87 78.9067 11.8883 479.0 474.0 5.0 P 192968 H4 2004-12-15T12:09:00 ... ZEP 2004 11 25 8 50 0 2004-11-25T08:50:00Z 2004.899912720097 1160-99 1867.36 1.87 78.9067 11.8883 479.0 474.0 5.0 P 192969 H4 2004-12-15T12:23:00 ... ZEP 2004 12 2 8 15 0 2004-12-02T08:15:00Z 2004.9189719945355 2079-99 1858.4 1.87 78.9067 11.8883 479.0 474.0 5.0 P 192970 H4 2004-12-15T12:37:00 ... ZEP 2004 12 2 8 15 0 2004-12-02T08:15:00Z 2004.9189719945355 2080-99 1854.69 1.87 78.9067 11.8883 479.0 474.0 5.0 P 192971 H4 2004-12-15T12:51:00 ... ZEP 2004 12 10 9 48 0 2004-12-10T09:48:00Z 2004.9410063752277 3441-99 1845.69 1.87 78.9067 11.8883 479.0 474.0 5.0 P 193567 H4 2005-01-06T13:59:00 ... ZEP 2004 12 10 9 48 0 2004-12-10T09:48:00Z 2004.9410063752277 3442-99 1847.04 1.87 78.9067 11.8883 479.0 474.0 5.0 P 193568 H4 2005-01-06T14:13:00 ... ZEP 2004 12 16 8 0 0 2004-12-16T08:00:00Z 2004.9571948998178 3443-99 1877.87 1.87 78.9067 11.8883 479.0 474.0 5.0 P 193569 H4 2005-01-06T15:24:00 ... ZEP 2004 12 16 8 0 0 2004-12-16T08:00:00Z 2004.9571948998178 3444-99 1878.57 1.87 78.9067 11.8883 479.0 474.0 5.0 P 193570 H4 2005-01-06T15:38:00 ... ZEP 2004 12 28 10 40 0 2004-12-28T10:40:00Z 2004.9902853673345 743-91 1905.67 1.87 78.9067 11.8883 479.0 474.0 5.0 P 193991 H4 2005-01-18T10:34:00 ... ZEP 2004 12 28 10 40 0 2004-12-28T10:40:00Z 2004.9902853673345 744-91 1905.12 1.87 78.9067 11.8883 479.0 474.0 5.0 P 193992 H4 2005-01-18T10:48:00 ... ZEP 2004 12 30 12 47 0 2004-12-30T12:47:00Z 2004.9959908166363 3189-99 1860.0 1.87 78.9067 11.8883 479.0 474.0 5.0 P 193959 H4 2005-01-18T11:02:00 ... ZEP 2004 12 30 12 47 0 2004-12-30T12:47:00Z 2004.9959908166363 3190-99 1858.97 1.87 78.9067 11.8883 479.0 474.0 5.0 P 193960 H4 2005-01-18T11:16:00 ... ZEP 2005 1 6 8 35 0 2005-01-06T08:35:00Z 2005.0146784627093 89-99 1873.74 1.87 78.9067 11.8883 479.0 474.0 5.0 P 194905 H4 2005-02-10T11:10:00 ... ZEP 2005 1 6 8 35 0 2005-01-06T08:35:00Z 2005.0146784627093 90-99 1873.86 1.87 78.9067 11.8883 479.0 474.0 5.0 P 194906 H4 2005-02-10T11:24:00 ... ZEP 2005 1 13 8 35 0 2005-01-13T08:35:00Z 2005.033856544901 2745-99 1912.05 1.87 78.9067 11.8883 479.0 474.0 5.0 P 194907 H4 2005-02-10T11:38:00 ... ZEP 2005 1 13 8 35 0 2005-01-13T08:35:00Z 2005.033856544901 2746-99 1914.37 1.87 78.9067 11.8883 479.0 474.0 5.0 P 194908 H4 2005-02-10T11:53:00 ... ZEP 2005 1 20 7 52 0 2005-01-20T07:52:00Z 2005.0529528158295 6621-66 1898.44 1.87 78.9067 11.8883 479.0 474.0 5.0 P 196322 H4 2005-03-11T12:08:00 ... ZEP 2005 1 20 7 52 0 2005-01-20T07:52:00Z 2005.0529528158295 6622-66 1899.51 1.87 78.9067 11.8883 479.0 474.0 5.0 P 196323 H4 2005-03-11T12:22:00 ... ZEP 2005 1 27 8 33 0 2005-01-27T08:33:00Z 2005.0722089041096 3779-99 1865.02 1.87 78.9067 11.8883 479.0 474.0 5.0 P 195125 H4 2005-02-16T13:44:00 ... ZEP 2005 1 27 8 33 0 2005-01-27T08:33:00Z 2005.0722089041096 3780-99 1866.03 1.87 78.9067 11.8883 479.0 474.0 5.0 P 195126 H4 2005-02-16T13:58:00 ... ZEP 2005 2 3 9 10 0 2005-02-03T09:10:00Z 2005.0914573820396 3961-99 1888.34 1.87 78.9067 11.8883 479.0 474.0 5.0 P 195127 H4 2005-02-16T13:15:00 ... ZEP 2005 2 3 9 10 0 2005-02-03T09:10:00Z 2005.0914573820396 3962-99 1887.1 1.87 78.9067 11.8883 479.0 474.0 5.0 P 195128 H4 2005-02-16T13:30:00 ... ZEP 2005 2 10 10 12 0 2005-02-10T10:12:00Z 2005.1107534246576 10-99 1849.21 1.87 78.9067 11.8883 479.0 474.0 5.0 P 196320 H4 2005-03-11T12:50:00 ... ZEP 2005 2 10 10 12 0 2005-02-10T10:12:00Z 2005.1107534246576 9-99 1847.89 1.87 78.9067 11.8883 479.0 474.0 5.0 P 196321 H4 2005-03-11T12:36:00 ... ZEP 2005 2 17 8 24 0 2005-02-17T08:24:00Z 2005.1297260273973 675-99 1854.47 1.87 78.9067 11.8883 479.0 474.0 5.0 P 196417 H4 2005-03-11T14:57:00 ... ZEP 2005 2 17 8 24 0 2005-02-17T08:24:00Z 2005.1297260273973 676-99 1853.81 1.87 78.9067 11.8883 479.0 474.0 5.0 P 196418 H4 2005-03-11T15:11:00 ... ZEP 2005 2 24 7 52 0 2005-02-24T07:52:00Z 2005.1488432267884 769-99 1867.98 1.87 78.9067 11.8883 479.0 474.0 5.0 P 196415 H4 2005-03-11T15:25:00 ... ZEP 2005 2 24 7 52 0 2005-02-24T07:52:00Z 2005.1488432267884 770-99 1868.96 1.87 78.9067 11.8883 479.0 474.0 5.0 P 196416 H4 2005-03-11T15:39:00 ... ZEP 2005 3 3 7 50 0 2005-03-03T07:50:00Z 2005.1680175038052 1925-99 1874.04 1.87 78.9067 11.8883 479.0 474.0 5.0 P 197269 H4 2005-04-04T10:09:00 ... ZEP 2005 3 3 7 50 0 2005-03-03T07:50:00Z 2005.1680175038052 1926-99 1874.43 1.87 78.9067 11.8883 479.0 474.0 5.0 P 197270 H4 2005-04-04T10:23:00 ... ZEP 2005 3 10 9 40 0 2005-03-10T09:40:00Z 2005.187404870624 3391-99 1857.01 1.87 78.9067 11.8883 479.0 474.0 5.0 P 197267 H4 2005-04-04T10:37:00 ... ZEP 2005 3 10 9 40 0 2005-03-10T09:40:00Z 2005.187404870624 3392-99 1855.63 1.87 78.9067 11.8883 479.0 474.0 5.0 P 197268 H4 2005-04-04T10:51:00 ... ZEP 2005 3 17 8 10 0 2005-03-17T08:10:00Z 2005.206411719939 793-91 1858.36 1.87 78.9067 11.8883 479.0 474.0 5.0 P 197487 H4 2005-04-11T10:47:00 ... ZEP 2005 3 17 8 10 0 2005-03-17T08:10:00Z 2005.206411719939 794-91 1860.42 1.87 78.9067 11.8883 479.0 474.0 5.0 P 197488 H4 2005-04-11T11:01:00 ... ZEP 2005 3 24 9 59 0 2005-03-24T09:59:00Z 2005.2257971841705 803-91 1858.79 1.87 78.9067 11.8883 479.0 474.0 5.0 P 197489 H4 2005-04-11T12:51:00 ... ZEP 2005 3 24 9 59 0 2005-03-24T09:59:00Z 2005.2257971841705 804-91 1858.86 1.87 78.9067 11.8883 479.0 474.0 5.0 P 197490 H4 2005-04-11T13:06:00 ... ZEP 2005 3 31 7 10 0 2005-03-31T07:10:00Z 2005.2446537290716 2219-99 1854.51 1.87 78.9067 11.8883 479.0 474.0 5.0 P 198177 H4 2005-04-29T11:56:00 ... ZEP 2005 3 31 7 10 0 2005-03-31T07:10:00Z 2005.2446537290716 2220-99 1855.44 1.87 78.9067 11.8883 479.0 474.0 5.0 P 198178 H4 2005-04-29T12:10:00 ... ZEP 2005 4 7 7 38 0 2005-04-07T07:38:00Z 2005.2638850837138 6248-66 1907.05 1.87 78.9067 11.8883 479.0 474.0 5.0 P 198176 H4 2005-04-28T16:22:00 .S. ZEP 2005 4 14 7 18 0 2005-04-14T07:18:00Z 2005.2830251141552 3695-99 1873.28 1.87 78.9067 11.8883 479.0 474.0 5.0 P 198609 H4 2005-05-18T12:10:00 ... ZEP 2005 4 14 7 18 0 2005-04-14T07:18:00Z 2005.2830251141552 3696-99 1871.83 1.87 78.9067 11.8883 479.0 474.0 5.0 P 198610 H4 2005-05-18T12:24:00 ... ZEP 2005 4 21 7 28 0 2005-04-21T07:28:00Z 2005.3022222222223 3897-99 1857.65 1.87 78.9067 11.8883 479.0 474.0 5.0 P 198611 H4 2005-05-18T11:42:00 ... ZEP 2005 4 21 7 28 0 2005-04-21T07:28:00Z 2005.3022222222223 3898-99 1858.46 1.87 78.9067 11.8883 479.0 474.0 5.0 P 198612 H4 2005-05-18T11:56:00 ... ZEP 2005 4 28 7 24 0 2005-04-28T07:24:00Z 2005.321392694064 3963-99 1863.14 1.87 78.9067 11.8883 479.0 474.0 5.0 P 199353 H4 2005-06-02T14:59:00 ... ZEP 2005 4 28 7 24 0 2005-04-28T07:24:00Z 2005.321392694064 3964-99 1864.5 1.87 78.9067 11.8883 479.0 474.0 5.0 P 199354 H4 2005-06-02T15:13:00 ... ZEP 2005 5 5 15 13 0 2005-05-05T15:13:00Z 2005.3414630898021 3205-99 1858.02 1.87 78.9067 11.8883 479.0 474.0 5.0 P 199351 H4 2005-06-02T12:08:00 ... ZEP 2005 5 5 15 13 0 2005-05-05T15:13:00Z 2005.3414630898021 3206-99 1860.1 1.87 78.9067 11.8883 479.0 474.0 5.0 P 199352 H4 2005-06-02T12:22:00 ... ZEP 2005 5 12 8 40 0 2005-05-12T08:40:00Z 2005.359893455099 313-99 1861.84 1.87 78.9067 11.8883 479.0 474.0 5.0 P 200058 H4 2005-06-16T14:16:00 ... ZEP 2005 5 12 8 40 0 2005-05-12T08:40:00Z 2005.359893455099 314-99 1865.81 1.87 78.9067 11.8883 479.0 474.0 5.0 P 200059 H4 2005-06-16T14:30:00 ... ZEP 2005 5 19 7 27 0 2005-05-19T07:27:00Z 2005.3789326484018 319-99 1858.82 1.87 78.9067 11.8883 479.0 474.0 5.0 P 200061 H4 2005-06-16T13:47:00 ... ZEP 2005 5 19 7 27 0 2005-05-19T07:27:00Z 2005.3789326484018 320-99 1857.21 1.87 78.9067 11.8883 479.0 474.0 5.0 P 200062 H4 2005-06-16T14:01:00 ... ZEP 2005 5 26 13 2 0 2005-05-26T13:02:00Z 2005.3987480974124 2717-99 1850.87 1.87 78.9067 11.8883 479.0 474.0 5.0 P 200991 H4 2005-07-07T12:50:00 ... ZEP 2005 5 26 13 2 0 2005-05-26T13:02:00Z 2005.3987480974124 2718-99 1847.39 1.87 78.9067 11.8883 479.0 474.0 5.0 P 200992 H4 2005-07-07T13:04:00 ... ZEP 2005 6 2 12 35 0 2005-06-02T12:35:00Z 2005.4178748097413 803-91 1854.89 1.87 78.9067 11.8883 479.0 474.0 5.0 P 200993 H4 2005-07-07T12:15:00 ... ZEP 2005 6 2 12 35 0 2005-06-02T12:35:00Z 2005.4178748097413 804-91 1851.88 1.87 78.9067 11.8883 479.0 474.0 5.0 P 200994 H4 2005-07-07T12:29:00 ... ZEP 2005 6 8 9 10 0 2005-06-08T09:10:00Z 2005.4339231354643 791-91 1848.76 1.87 78.9067 11.8883 479.0 474.0 5.0 P 201767 H4 2005-07-18T12:39:00 ... ZEP 2005 6 8 9 10 0 2005-06-08T09:10:00Z 2005.4339231354643 792-91 1849.49 1.87 78.9067 11.8883 479.0 474.0 5.0 P 201768 H4 2005-07-18T12:53:00 ... ZEP 2005 6 16 7 19 0 2005-06-16T07:19:00Z 2005.4556297564689 733-91 1834.23 1.87 78.9067 11.8883 479.0 474.0 5.0 P 201765 H4 2005-07-18T13:07:00 ... ZEP 2005 6 16 7 19 0 2005-06-16T07:19:00Z 2005.4556297564689 734-91 1830.03 1.87 78.9067 11.8883 479.0 474.0 5.0 P 201766 H4 2005-07-18T13:21:00 ... ZEP 2005 6 23 7 47 0 2005-06-23T07:47:00Z 2005.474861111111 783-91 1827.95 1.87 78.9067 11.8883 479.0 474.0 5.0 P 203701 H4 2005-08-22T10:13:00 ... ZEP 2005 6 23 7 47 0 2005-06-23T07:47:00Z 2005.474861111111 784-91 1833.63 1.87 78.9067 11.8883 479.0 474.0 5.0 P 203702 H4 2005-08-22T10:27:00 ... ZEP 2005 6 30 12 50 0 2005-06-30T12:50:00Z 2005.4946156773212 811-91 1837.38 1.87 78.9067 11.8883 479.0 474.0 5.0 P 203699 H4 2005-08-22T09:44:00 ... ZEP 2005 6 30 12 50 0 2005-06-30T12:50:00Z 2005.4946156773212 812-91 1834.54 1.87 78.9067 11.8883 479.0 474.0 5.0 P 203700 H4 2005-08-22T09:58:00 ... ZEP 2005 7 7 14 20 0 2005-07-07T14:20:00Z 2005.5139649923897 3731-99 1831.49 1.87 78.9067 11.8883 479.0 474.0 5.0 P 203711 H4 2005-08-22T13:04:00 ... ZEP 2005 7 7 14 20 0 2005-07-07T14:20:00Z 2005.5139649923897 3732-99 1831.96 1.87 78.9067 11.8883 479.0 474.0 5.0 P 203712 H4 2005-08-22T13:18:00 ... ZEP 2005 7 14 13 15 0 2005-07-14T13:15:00Z 2005.5330194063927 1925-99 1829.14 1.87 78.9067 11.8883 479.0 474.0 5.0 P 203713 H4 2005-08-22T12:35:00 ... ZEP 2005 7 14 13 15 0 2005-07-14T13:15:00Z 2005.5330194063927 1926-99 1827.8 1.87 78.9067 11.8883 479.0 474.0 5.0 P 203714 H4 2005-08-22T12:49:00 ... ZEP 2005 7 21 8 39 0 2005-07-21T08:39:00Z 2005.5516723744292 4167-99 1820.96 1.87 78.9067 11.8883 479.0 474.0 5.0 P 203703 H4 2005-08-22T10:41:00 ... ZEP 2005 7 21 8 39 0 2005-07-21T08:39:00Z 2005.5516723744292 4168-99 1826.09 1.87 78.9067 11.8883 479.0 474.0 5.0 P 203704 H4 2005-08-22T10:55:00 ... ZEP 2005 7 28 7 46 0 2005-07-28T07:46:00Z 2005.5707496194825 2067-99 1834.45 1.87 78.9067 11.8883 479.0 474.0 5.0 P 203705 H4 2005-08-22T11:10:00 ... ZEP 2005 7 28 7 46 0 2005-07-28T07:46:00Z 2005.5707496194825 2068-99 1832.15 1.87 78.9067 11.8883 479.0 474.0 5.0 P 203706 H4 2005-08-22T11:24:00 ... ZEP 2005 8 4 7 9 0 2005-08-04T07:09:00Z 2005.589857305936 385-99 1852.84 1.87 78.9067 11.8883 479.0 474.0 5.0 P 204427 H4 2005-08-31T15:53:00 ... ZEP 2005 8 4 7 9 0 2005-08-04T07:09:00Z 2005.589857305936 386-99 1853.63 1.87 78.9067 11.8883 479.0 474.0 5.0 P 204428 H4 2005-08-31T16:07:00 ... ZEP 2005 8 6 5 53 0 2005-08-06T05:53:00Z 2005.5951921613394 2515-99 1830.04 1.87 78.9067 11.8883 479.0 474.0 5.0 P 204429 H4 2005-08-31T16:21:00 ... ZEP 2005 8 6 5 53 0 2005-08-06T05:53:00Z 2005.5951921613394 2516-99 1823.2 1.87 78.9067 11.8883 479.0 474.0 5.0 P 204430 H4 2005-08-31T16:36:00 ... ZEP 2005 8 11 7 33 0 2005-08-11T07:33:00Z 2005.6090810502283 743-91 1836.08 2.05 78.9067 11.8883 479.0 474.0 5.0 P 205190 H4 2005-09-06T13:01:00 ... ZEP 2005 8 11 7 33 0 2005-08-11T07:33:00Z 2005.6090810502283 744-91 1834.54 2.05 78.9067 11.8883 479.0 474.0 5.0 P 205191 H4 2005-09-06T13:15:00 ... ZEP 2005 8 18 7 19 0 2005-08-18T07:19:00Z 2005.6282324961949 2075-99 1834.95 2.05 78.9067 11.8883 479.0 474.0 5.0 P 205193 H4 2005-09-06T13:29:00 ... ZEP 2005 8 18 7 19 0 2005-08-18T07:19:00Z 2005.6282324961949 2076-99 1835.95 2.05 78.9067 11.8883 479.0 474.0 5.0 P 205194 H4 2005-09-06T13:43:00 ... ZEP 2005 8 25 8 59 0 2005-08-25T08:59:00Z 2005.6476008371385 39-99 1834.7 2.05 78.9067 11.8883 479.0 474.0 5.0 P 205730 H4 2005-09-23T16:22:00 ... ZEP 2005 8 25 8 59 0 2005-08-25T08:59:00Z 2005.6476008371385 40-99 1832.84 2.05 78.9067 11.8883 479.0 474.0 5.0 P 205731 H4 2005-09-23T16:37:00 ... ZEP 2005 9 1 7 45 0 2005-09-01T07:45:00Z 2005.666638127854 1359-99 1840.83 2.05 78.9067 11.8883 479.0 474.0 5.0 P 205732 H4 2005-09-23T15:54:00 ... ZEP 2005 9 1 7 45 0 2005-09-01T07:45:00Z 2005.666638127854 1360-99 1839.49 2.05 78.9067 11.8883 479.0 474.0 5.0 P 205733 H4 2005-09-23T16:08:00 ... ZEP 2005 9 8 6 59 0 2005-09-08T06:59:00Z 2005.6857286910197 343-99 1835.84 2.05 78.9067 11.8883 479.0 474.0 5.0 P 206987 H4 2005-10-20T10:33:00 ... ZEP 2005 9 8 6 59 0 2005-09-08T06:59:00Z 2005.6857286910197 344-99 1836.42 2.05 78.9067 11.8883 479.0 474.0 5.0 P 206988 H4 2005-10-20T10:48:00 ... ZEP 2005 9 15 7 25 0 2005-09-15T07:25:00Z 2005.704956240487 1937-99 1871.2 2.05 78.9067 11.8883 479.0 474.0 5.0 P 206989 H4 2005-10-20T10:05:00 ... ZEP 2005 9 15 7 25 0 2005-09-15T07:25:00Z 2005.704956240487 1938-99 1869.62 2.05 78.9067 11.8883 479.0 474.0 5.0 P 206990 H4 2005-10-20T10:19:00 ... ZEP 2005 9 22 7 4 0 2005-09-22T07:04:00Z 2005.724094368341 733-91 1865.28 2.05 78.9067 11.8883 479.0 474.0 5.0 P 207262 H4 2005-10-27T08:53:00 ... ZEP 2005 9 22 7 4 0 2005-09-22T07:04:00Z 2005.724094368341 734-91 1864.01 2.05 78.9067 11.8883 479.0 474.0 5.0 P 207263 H4 2005-10-27T09:07:00 ... ZEP 2005 9 29 7 32 0 2005-09-29T07:32:00Z 2005.7433257229832 3837-99 1868.91 2.05 78.9067 11.8883 479.0 474.0 5.0 P 207260 H4 2005-10-26T15:10:00 ... ZEP 2005 9 29 7 32 0 2005-09-29T07:32:00Z 2005.7433257229832 3838-99 1869.05 2.05 78.9067 11.8883 479.0 474.0 5.0 P 207261 H4 2005-10-26T15:25:00 ... ZEP 2005 10 6 0 0 0 2005-10-06T00:00:00Z 2005.7616438356165 803-91 1863.37 2.05 78.9067 11.8883 479.0 474.0 5.0 P 207853 H4 2005-11-09T09:20:00 ... ZEP 2005 10 6 0 0 0 2005-10-06T00:00:00Z 2005.7616438356165 804-91 1861.16 2.05 78.9067 11.8883 479.0 474.0 5.0 P 207854 H4 2005-11-09T09:34:00 ... ZEP 2005 10 13 7 24 0 2005-10-13T07:24:00Z 2005.7816666666668 791-91 1856.14 2.05 78.9067 11.8883 479.0 474.0 5.0 P 207851 H4 2005-11-09T09:49:00 ... ZEP 2005 10 13 7 24 0 2005-10-13T07:24:00Z 2005.7816666666668 792-91 1861.83 2.05 78.9067 11.8883 479.0 474.0 5.0 P 207852 H4 2005-11-09T10:03:00 ... ZEP 2005 10 20 7 31 0 2005-10-20T07:31:00Z 2005.8008580669712 139-99 1864.75 2.05 78.9067 11.8883 479.0 474.0 5.0 P 211582 H4 2006-01-23T15:27:00 ... ZEP 2005 10 20 7 31 0 2005-10-20T07:31:00Z 2005.8008580669712 140-99 1866.17 2.05 78.9067 11.8883 479.0 474.0 5.0 P 211583 H4 2006-01-23T15:41:00 ... ZEP 2005 10 27 8 15 0 2005-10-27T08:15:00Z 2005.8201198630136 2979-99 1859.38 2.05 78.9067 11.8883 479.0 474.0 5.0 P 209067 H4 2005-11-22T09:11:00 ... ZEP 2005 10 27 8 15 0 2005-10-27T08:15:00Z 2005.8201198630136 2980-99 1854.97 2.05 78.9067 11.8883 479.0 474.0 5.0 P 209068 H4 2005-11-22T09:26:00 ... ZEP 2005 11 3 7 55 0 2005-11-03T07:55:00Z 2005.8392598934552 2965-99 1856.73 2.05 78.9067 11.8883 479.0 474.0 5.0 P 209065 H4 2005-11-22T10:37:00 ... ZEP 2005 11 3 7 55 0 2005-11-03T07:55:00Z 2005.8392598934552 2966-99 1858.43 2.05 78.9067 11.8883 479.0 474.0 5.0 P 209066 H4 2005-11-22T10:51:00 ... ZEP 2005 11 10 8 30 0 2005-11-10T08:30:00Z 2005.85850456621 6229-66 1854.52 2.05 78.9067 11.8883 479.0 474.0 5.0 P 209601 H4 2005-11-29T14:41:00 ... ZEP 2005 11 10 8 30 0 2005-11-10T08:30:00Z 2005.85850456621 6230-66 1855.08 2.05 78.9067 11.8883 479.0 474.0 5.0 P 209602 H4 2005-11-29T14:55:00 ... ZEP 2005 11 17 9 46 0 2005-11-17T09:46:00Z 2005.8778272450534 909-99 1882.73 2.05 78.9067 11.8883 479.0 474.0 5.0 P 209599 H4 2005-11-29T14:12:00 ... ZEP 2005 11 17 9 46 0 2005-11-17T09:46:00Z 2005.8778272450534 910-99 1883.32 2.05 78.9067 11.8883 479.0 474.0 5.0 P 209600 H4 2005-11-29T14:26:00 ... ZEP 2005 11 24 8 23 0 2005-11-24T08:23:00Z 2005.896847412481 4195-99 1895.92 2.05 78.9067 11.8883 479.0 474.0 5.0 P 210306 H4 2005-12-19T16:35:00 ... ZEP 2005 11 24 8 23 0 2005-11-24T08:23:00Z 2005.896847412481 4196-99 1896.48 2.05 78.9067 11.8883 479.0 474.0 5.0 P 210307 H4 2005-12-19T16:50:00 ... ZEP 2005 12 1 8 35 0 2005-12-01T08:35:00Z 2005.916048325723 743-91 1869.37 2.05 78.9067 11.8883 479.0 474.0 5.0 P 210308 H4 2005-12-19T17:04:00 ... ZEP 2005 12 1 8 35 0 2005-12-01T08:35:00Z 2005.916048325723 744-91 1868.25 2.05 78.9067 11.8883 479.0 474.0 5.0 P 210309 H4 2005-12-19T17:18:00 ... ZEP 2005 12 8 8 5 0 2005-12-08T08:05:00Z 2005.9351693302892 305-99 1865.62 2.05 78.9067 11.8883 479.0 474.0 5.0 P 212363 H4 2006-02-06T18:00:00 ... ZEP 2005 12 8 8 5 0 2005-12-08T08:05:00Z 2005.9351693302892 306-99 1865.7 2.05 78.9067 11.8883 479.0 474.0 5.0 P 212364 H4 2006-02-06T18:14:00 ... ZEP 2005 12 15 7 55 0 2005-12-15T07:55:00Z 2005.9543283866058 1423-99 1909.11 2.05 78.9067 11.8883 479.0 474.0 5.0 P 211584 H4 2006-01-23T15:55:00 .S. ZEP 2005 12 15 7 55 0 2005-12-15T07:55:00Z 2005.9543283866058 1424-99 1909.59 2.05 78.9067 11.8883 479.0 474.0 5.0 P 211585 H4 2006-01-23T16:10:00 .S. ZEP 2005 12 22 14 12 0 2005-12-22T14:12:00Z 2005.9742237442922 599-99 1873.18 2.05 78.9067 11.8883 479.0 474.0 5.0 P 211578 H4 2006-01-23T14:30:00 ... ZEP 2005 12 22 14 12 0 2005-12-22T14:12:00Z 2005.9742237442922 600-99 1874.56 2.05 78.9067 11.8883 479.0 474.0 5.0 P 211579 H4 2006-01-23T14:44:00 ... ZEP 2005 12 29 7 15 0 2005-12-29T07:15:00Z 2005.9926084474887 1125-99 1856.04 2.05 78.9067 11.8883 479.0 474.0 5.0 P 211580 H4 2006-01-23T14:58:00 ... ZEP 2005 12 29 7 15 0 2005-12-29T07:15:00Z 2005.9926084474887 1126-99 1859.11 2.05 78.9067 11.8883 479.0 474.0 5.0 P 211581 H4 2006-01-23T15:13:00 ... ZEP 2006 1 5 9 19 0 2006-01-05T09:19:00Z 2006.0120224505326 3569-99 1851.0 2.05 78.9067 11.8883 479.0 474.0 5.0 P 212041 H4 2006-02-06T14:12:00 ... ZEP 2006 1 5 9 19 0 2006-01-05T09:19:00Z 2006.0120224505326 3570-99 1848.23 2.05 78.9067 11.8883 479.0 474.0 5.0 P 212042 H4 2006-02-06T14:26:00 ... ZEP 2006 1 12 7 55 0 2006-01-12T07:55:00Z 2006.031040715373 733-91 1855.52 2.05 78.9067 11.8883 479.0 474.0 5.0 P 212039 H4 2006-02-06T13:43:00 ... ZEP 2006 1 12 7 55 0 2006-01-12T07:55:00Z 2006.031040715373 734-91 1858.96 2.05 78.9067 11.8883 479.0 474.0 5.0 P 212040 H4 2006-02-06T13:58:00 ... ZEP 2006 1 19 9 35 0 2006-01-19T09:35:00Z 2006.0504090563165 4103-99 1876.57 2.05 78.9067 11.8883 479.0 474.0 5.0 P 212361 H4 2006-02-06T17:31:00 ... ZEP 2006 1 19 9 35 0 2006-01-19T09:35:00Z 2006.0504090563165 4104-99 1880.89 2.05 78.9067 11.8883 479.0 474.0 5.0 P 212362 H4 2006-02-06T17:45:00 ... ZEP 2006 1 26 8 1 0 2006-01-26T08:01:00Z 2006.0694082952816 2183-99 1855.65 2.05 78.9067 11.8883 479.0 474.0 5.0 P 213046 H4 2006-02-17T14:58:00 ... ZEP 2006 1 26 8 1 0 2006-01-26T08:01:00Z 2006.0694082952816 2184-99 1856.57 2.05 78.9067 11.8883 479.0 474.0 5.0 P 213047 H4 2006-02-17T15:12:00 ... ZEP 2006 2 2 8 4 0 2006-02-02T08:04:00Z 2006.0885920852359 175-99 1917.13 2.05 78.9067 11.8883 479.0 474.0 5.0 P 213044 H4 2006-02-17T15:26:00 .S. ZEP 2006 2 2 8 4 0 2006-02-02T08:04:00Z 2006.0885920852359 176-99 1918.43 2.05 78.9067 11.8883 479.0 474.0 5.0 P 213045 H4 2006-02-17T15:40:00 .S. ZEP 2006 2 9 8 10 0 2006-02-09T08:10:00Z 2006.1077815829528 773-99 -999.99 -999.999 78.9067 11.8883 479.0 474.0 5.0 P 213476 H4 2006-03-02T09:07:00 M.. ZEP 2006 2 9 8 10 0 2006-02-09T08:10:00Z 2006.1077815829528 793-91 1863.78 2.05 78.9067 11.8883 479.0 474.0 5.0 P 213475 H4 2006-03-02T08:52:00 ... ZEP 2006 2 16 9 7 0 2006-02-16T09:07:00Z 2006.1270681126332 774-99 1866.71 2.05 78.9067 11.8883 479.0 474.0 5.0 P 213473 H4 2006-03-02T10:18:00 ... ZEP 2006 2 16 9 7 0 2006-02-16T09:07:00Z 2006.1270681126332 794-91 1863.87 2.05 78.9067 11.8883 479.0 474.0 5.0 P 213474 H4 2006-03-02T10:32:00 ... ZEP 2006 2 23 7 59 0 2006-02-23T07:59:00Z 2006.1461168188737 765-99 1862.27 2.05 78.9067 11.8883 479.0 474.0 5.0 P 214430 H4 2006-03-28T16:05:00 ... ZEP 2006 2 23 7 59 0 2006-02-23T07:59:00Z 2006.1461168188737 766-99 1856.95 2.05 78.9067 11.8883 479.0 474.0 5.0 P 214431 H4 2006-03-28T16:19:00 ... ZEP 2006 3 2 8 27 0 2006-03-02T08:27:00Z 2006.165348173516 2155-99 1870.42 2.05 78.9067 11.8883 479.0 474.0 5.0 P 214186 H4 2006-03-22T14:38:00 ... ZEP 2006 3 2 8 27 0 2006-03-02T08:27:00Z 2006.165348173516 2156-99 1869.09 2.05 78.9067 11.8883 479.0 474.0 5.0 P 214187 H4 2006-03-22T14:52:00 ... ZEP 2006 3 9 8 12 0 2006-03-09T08:12:00Z 2006.184497716895 3185-99 1867.35 2.05 78.9067 11.8883 479.0 474.0 5.0 P 214184 H4 2006-03-22T15:06:00 ... ZEP 2006 3 9 8 12 0 2006-03-09T08:12:00Z 2006.184497716895 3186-99 1873.7 2.05 78.9067 11.8883 479.0 474.0 5.0 P 214185 H4 2006-03-22T15:20:00 ... ZEP 2006 3 16 9 55 0 2006-03-16T09:55:00Z 2006.2038717656012 473-99 1875.27 2.05 78.9067 11.8883 479.0 474.0 5.0 P 214428 H4 2006-03-28T16:33:00 ... ZEP 2006 3 16 9 55 0 2006-03-16T09:55:00Z 2006.2038717656012 474-99 1875.05 2.05 78.9067 11.8883 479.0 474.0 5.0 P 214429 H4 2006-03-28T16:47:00 ... ZEP 2006 3 23 8 55 0 2006-03-23T08:55:00Z 2006.2229356925418 3917-99 1871.03 2.05 78.9067 11.8883 479.0 474.0 5.0 P 215338 H4 2006-04-14T09:51:00 ... ZEP 2006 3 23 8 55 0 2006-03-23T08:55:00Z 2006.2229356925418 3918-99 1869.56 2.05 78.9067 11.8883 479.0 474.0 5.0 P 215339 H4 2006-04-14T10:05:00 ... ZEP 2006 3 30 7 55 0 2006-03-30T07:55:00Z 2006.2419996194824 693-99 1861.07 2.05 78.9067 11.8883 479.0 474.0 5.0 P 215336 H4 2006-04-14T09:22:00 ... ZEP 2006 3 30 7 55 0 2006-03-30T07:55:00Z 2006.2419996194824 694-99 1858.01 2.05 78.9067 11.8883 479.0 474.0 5.0 P 215337 H4 2006-04-14T09:37:00 ... ZEP 2006 4 7 9 20 0 2006-04-07T09:20:00Z 2006.2640791476408 4617-99 1869.88 2.05 78.9067 11.8883 479.0 474.0 5.0 P 216127 H4 2006-05-05T12:31:00 ... ZEP 2006 4 7 9 20 0 2006-04-07T09:20:00Z 2006.2640791476408 4618-99 1868.75 2.05 78.9067 11.8883 479.0 474.0 5.0 P 216128 H4 2006-05-05T12:46:00 ... ZEP 2006 4 13 9 15 0 2006-04-13T09:15:00Z 2006.2805079908676 6389-66 1903.26 2.05 78.9067 11.8883 479.0 474.0 5.0 P 216125 H4 2006-05-05T13:00:00 .S. ZEP 2006 4 13 9 15 0 2006-04-13T09:15:00Z 2006.2805079908676 6390-66 1899.7 2.05 78.9067 11.8883 479.0 474.0 5.0 P 216126 H4 2006-05-05T13:14:00 .S. ZEP 2006 4 20 6 45 0 2006-04-20T06:45:00Z 2006.2994006849315 291-99 1864.45 2.05 78.9067 11.8883 479.0 474.0 5.0 P 217183 H4 2006-06-01T09:51:00 ... ZEP 2006 4 20 6 45 0 2006-04-20T06:45:00Z 2006.2994006849315 292-99 1862.84 2.05 78.9067 11.8883 479.0 474.0 5.0 P 217184 H4 2006-06-01T10:05:00 ... ZEP 2006 4 27 9 4 0 2006-04-27T09:04:00Z 2006.3188432267884 1803-99 1865.16 2.05 78.9067 11.8883 479.0 474.0 5.0 P 216999 H4 2006-05-26T10:28:00 ... ZEP 2006 4 27 9 4 0 2006-04-27T09:04:00Z 2006.3188432267884 1804-99 1863.68 2.05 78.9067 11.8883 479.0 474.0 5.0 P 217000 H4 2006-05-26T10:42:00 ... ZEP 2006 5 4 7 18 0 2006-05-04T07:18:00Z 2006.3378196347032 733-91 1860.89 2.05 78.9067 11.8883 479.0 474.0 5.0 P 217001 H4 2006-05-26T10:57:00 ... ZEP 2006 5 4 7 18 0 2006-05-04T07:18:00Z 2006.3378196347032 734-91 1861.61 2.05 78.9067 11.8883 479.0 474.0 5.0 P 217002 H4 2006-05-26T11:11:00 ... ZEP 2006 5 11 6 52 0 2006-05-11T06:52:00Z 2006.3569482496196 743-91 1855.1 2.05 78.9067 11.8883 479.0 474.0 5.0 P 217185 H4 2006-06-01T09:22:00 ... ZEP 2006 5 11 6 52 0 2006-05-11T06:52:00Z 2006.3569482496196 744-91 1856.06 2.05 78.9067 11.8883 479.0 474.0 5.0 P 217186 H4 2006-06-01T09:36:00 ... ZEP 2006 5 18 9 7 0 2006-05-18T09:07:00Z 2006.3763831811264 1317-99 1851.0 2.05 78.9067 11.8883 479.0 474.0 5.0 P 218841 H4 2006-07-13T16:27:00 ... ZEP 2006 5 24 6 59 0 2006-05-24T06:59:00Z 2006.3925780060883 2947-99 1856.22 2.05 78.9067 11.8883 479.0 474.0 5.0 P 218545 H4 2006-06-30T11:45:00 ... ZEP 2006 5 24 6 59 0 2006-05-24T06:59:00Z 2006.3925780060883 2948-99 1857.08 2.05 78.9067 11.8883 479.0 474.0 5.0 P 218546 H4 2006-06-30T11:59:00 ... ZEP 2006 6 1 8 27 0 2006-06-01T08:27:00Z 2006.414663242009 407-99 1853.53 2.05 78.9067 11.8883 479.0 474.0 5.0 P 218543 H4 2006-06-30T12:13:00 ... ZEP 2006 6 1 8 27 0 2006-06-01T08:27:00Z 2006.414663242009 408-99 1851.76 2.05 78.9067 11.8883 479.0 474.0 5.0 P 218544 H4 2006-06-30T12:28:00 ... ZEP 2006 6 8 12 34 56 2006-06-08T12:34:56Z 2006.4343130390664 245-99 1843.15 2.05 78.9067 11.8883 479.0 474.0 5.0 P 218839 H4 2006-07-13T16:41:00 ... ZEP 2006 6 8 12 34 56 2006-06-08T12:34:56Z 2006.4343130390664 246-99 1845.07 2.05 78.9067 11.8883 479.0 474.0 5.0 P 218840 H4 2006-07-13T16:55:00 ... ZEP 2006 6 15 6 58 0 2006-06-15T06:58:00Z 2006.4528500761035 3293-99 1843.04 2.05 78.9067 11.8883 479.0 474.0 5.0 P 219010 H4 2006-07-17T10:49:00 ... ZEP 2006 6 15 6 58 0 2006-06-15T06:58:00Z 2006.4528500761035 3294-99 1842.42 2.05 78.9067 11.8883 479.0 474.0 5.0 P 219011 H4 2006-07-17T11:03:00 ... ZEP 2006 6 20 13 0 0 2006-06-20T13:00:00Z 2006.4672374429224 3631-99 1839.26 2.05 78.9067 11.8883 479.0 474.0 5.0 P 219008 H4 2006-07-17T10:20:00 ... ZEP 2006 6 20 13 0 0 2006-06-20T13:00:00Z 2006.4672374429224 3632-99 1840.81 2.05 78.9067 11.8883 479.0 474.0 5.0 P 219009 H4 2006-07-17T10:34:00 ... ZEP 2006 6 22 8 29 0 2006-06-22T08:29:00Z 2006.4722012937596 3915-99 1835.97 2.05 78.9067 11.8883 479.0 474.0 5.0 P 219685 H4 2006-07-27T10:21:00 ... ZEP 2006 6 22 8 29 0 2006-06-22T08:29:00Z 2006.4722012937596 3916-99 1839.16 2.05 78.9067 11.8883 479.0 474.0 5.0 P 219686 H4 2006-07-27T10:35:00 ... ZEP 2006 7 2 12 26 0 2006-07-02T12:26:00Z 2006.5000494672754 1999-99 1834.54 2.05 78.9067 11.8883 479.0 474.0 5.0 P 219687 H4 2006-07-27T10:50:00 ... ZEP 2006 7 2 12 26 0 2006-07-02T12:26:00Z 2006.5000494672754 2000-99 1836.49 2.05 78.9067 11.8883 479.0 474.0 5.0 P 219688 H4 2006-07-27T11:04:00 ... ZEP 2006 7 7 9 18 0 2006-07-07T09:18:00Z 2006.513390410959 783-91 1835.11 2.05 78.9067 11.8883 479.0 474.0 5.0 P 220421 H4 2006-08-11T14:57:00 ... ZEP 2006 7 7 9 18 0 2006-07-07T09:18:00Z 2006.513390410959 784-91 1835.33 2.05 78.9067 11.8883 479.0 474.0 5.0 P 220422 H4 2006-08-11T15:11:00 ... ZEP 2006 7 13 7 22 0 2006-07-13T07:22:00Z 2006.5296080669712 112-99 1830.93 2.05 78.9067 11.8883 479.0 474.0 5.0 P 220749 H4 2006-08-23T11:59:00 ... ZEP 2006 7 21 7 33 0 2006-07-21T07:33:00Z 2006.5515468036529 811-91 1830.85 2.05 78.9067 11.8883 479.0 474.0 5.0 P 220423 H4 2006-08-11T15:25:00 ... ZEP 2006 7 21 7 33 0 2006-07-21T07:33:00Z 2006.5515468036529 812-91 1828.39 2.05 78.9067 11.8883 479.0 474.0 5.0 P 220424 H4 2006-08-11T15:39:00 ... ZEP 2006 7 30 10 21 0 2006-07-30T10:21:00Z 2006.5765239726027 1763-99 1821.52 2.05 78.9067 11.8883 479.0 474.0 5.0 P 220750 H4 2006-08-22T11:24:00 ... ZEP 2006 7 30 10 21 0 2006-07-30T10:21:00Z 2006.5765239726027 1764-99 1820.34 2.05 78.9067 11.8883 479.0 474.0 5.0 P 220751 H4 2006-08-22T11:38:00 ... ZEP 2006 8 3 8 36 0 2006-08-03T08:36:00Z 2006.5872831050228 557-99 1821.24 2.05 78.9067 11.8883 479.0 474.0 5.0 P 221363 H4 2006-09-01T09:58:00 ... ZEP 2006 8 3 8 36 0 2006-08-03T08:36:00Z 2006.5872831050228 558-99 1820.23 2.05 78.9067 11.8883 479.0 474.0 5.0 P 221364 H4 2006-09-01T10:13:00 ... ZEP 2006 8 11 7 40 0 2006-08-11T07:40:00Z 2006.609094368341 3443-99 1829.08 2.05 78.9067 11.8883 479.0 474.0 5.0 P 221365 H4 2006-09-01T09:30:00 ... ZEP 2006 8 11 7 40 0 2006-08-11T07:40:00Z 2006.609094368341 3444-99 1828.82 2.05 78.9067 11.8883 479.0 474.0 5.0 P 221366 H4 2006-09-01T09:44:00 ... ZEP 2006 8 17 7 35 0 2006-08-17T07:35:00Z 2006.6255232115677 1105-99 1820.23 2.05 78.9067 11.8883 479.0 474.0 5.0 P 222073 H4 2006-09-13T09:58:00 ... ZEP 2006 8 17 7 35 0 2006-08-17T07:35:00Z 2006.6255232115677 1106-99 1822.39 2.05 78.9067 11.8883 479.0 474.0 5.0 P 222074 H4 2006-09-13T10:13:00 ... ZEP 2006 8 24 8 32 0 2006-08-24T08:32:00Z 2006.644809741248 3907-99 1822.71 2.05 78.9067 11.8883 479.0 474.0 5.0 P 222071 H4 2006-09-13T09:30:00 ... ZEP 2006 8 24 8 32 0 2006-08-24T08:32:00Z 2006.644809741248 3908-99 1823.56 2.05 78.9067 11.8883 479.0 474.0 5.0 P 222072 H4 2006-09-13T09:44:00 ... ZEP 2006 8 31 7 27 0 2006-08-31T07:27:00Z 2006.663864155251 117-99 1833.95 2.05 78.9067 11.8883 479.0 474.0 5.0 P 223450 H4 2006-10-17T14:54:00 ... ZEP 2006 8 31 7 27 0 2006-08-31T07:27:00Z 2006.663864155251 118-99 1834.81 2.05 78.9067 11.8883 479.0 474.0 5.0 P 223451 H4 2006-10-17T15:08:00 ... ZEP 2006 9 7 7 28 0 2006-09-07T07:28:00Z 2006.6830441400305 3155-99 1840.2 2.05 78.9067 11.8883 479.0 474.0 5.0 P 223448 H4 2006-10-17T13:36:00 ... ZEP 2006 9 7 7 28 0 2006-09-07T07:28:00Z 2006.6830441400305 3156-99 1835.04 2.05 78.9067 11.8883 479.0 474.0 5.0 P 223449 H4 2006-10-17T13:50:00 ... ZEP 2006 9 14 8 44 0 2006-09-14T08:44:00Z 2006.7023668188738 733-91 1839.22 2.05 78.9067 11.8883 479.0 474.0 5.0 P 223434 H4 2006-10-16T08:57:00 ... ZEP 2006 9 14 8 44 0 2006-09-14T08:44:00Z 2006.7023668188738 734-91 1845.15 2.05 78.9067 11.8883 479.0 474.0 5.0 P 223435 H4 2006-10-16T09:11:00 ... ZEP 2006 9 21 7 49 0 2006-09-21T07:49:00Z 2006.721440258752 4301-99 1859.76 2.05 78.9067 11.8883 479.0 474.0 5.0 P 223432 H4 2006-10-16T09:26:00 ... ZEP 2006 9 21 7 49 0 2006-09-21T07:49:00Z 2006.721440258752 4302-99 1858.23 2.05 78.9067 11.8883 479.0 474.0 5.0 P 223433 H4 2006-10-16T09:40:00 ... ZEP 2006 9 28 7 50 0 2006-09-28T07:50:00Z 2006.740620243531 1459-99 1855.46 2.05 78.9067 11.8883 479.0 474.0 5.0 P 224033 H4 2006-10-30T12:08:00 ... ZEP 2006 9 28 7 50 0 2006-09-28T07:50:00Z 2006.740620243531 1460-99 1855.12 2.05 78.9067 11.8883 479.0 474.0 5.0 P 224034 H4 2006-10-30T12:22:00 ... ZEP 2006 10 6 8 10 0 2006-10-06T08:10:00Z 2006.7625761035008 793-91 1859.83 2.05 78.9067 11.8883 479.0 474.0 5.0 P 224031 H4 2006-10-30T11:39:00 ... ZEP 2006 10 6 8 10 0 2006-10-06T08:10:00Z 2006.7625761035008 794-91 1858.31 2.05 78.9067 11.8883 479.0 474.0 5.0 P 224032 H4 2006-10-30T11:53:00 ... ZEP 2006 10 15 9 45 0 2006-10-15T09:45:00Z 2006.7874143835616 4023-99 1849.99 2.05 78.9067 11.8883 479.0 474.0 5.0 P 224503 H4 2006-11-09T09:48:00 ... ZEP 2006 10 15 9 45 0 2006-10-15T09:45:00Z 2006.7874143835616 4024-99 1850.77 2.05 78.9067 11.8883 479.0 474.0 5.0 P 224504 H4 2006-11-09T10:02:00 ... ZEP 2006 10 19 7 0 0 2006-10-19T07:00:00Z 2006.7980593607306 743-91 1862.35 2.05 78.9067 11.8883 479.0 474.0 5.0 P 224501 H4 2006-11-08T14:33:00 ... ZEP 2006 10 19 7 0 0 2006-10-19T07:00:00Z 2006.7980593607306 744-91 1863.07 2.05 78.9067 11.8883 479.0 474.0 5.0 P 224502 H4 2006-11-08T14:47:00 ... ZEP 2006 10 24 10 13 0 2006-10-24T10:13:00Z 2006.8121251902587 791-91 1868.13 2.05 78.9067 11.8883 479.0 474.0 5.0 P 226486 H4 2007-01-03T12:10:00 ... ZEP 2006 10 24 10 13 0 2006-10-24T10:13:00Z 2006.8121251902587 792-91 1871.38 2.05 78.9067 11.8883 479.0 474.0 5.0 P 226487 H4 2007-01-03T12:24:00 ... ZEP 2006 10 26 7 15 0 2006-10-26T07:15:00Z 2006.817265981735 1155-99 1847.59 2.05 78.9067 11.8883 479.0 474.0 5.0 P 225343 H4 2006-11-28T13:56:00 ... ZEP 2006 10 26 7 15 0 2006-10-26T07:15:00Z 2006.817265981735 1156-99 1848.54 2.05 78.9067 11.8883 479.0 474.0 5.0 P 225344 H4 2006-11-28T14:10:00 ... ZEP 2006 11 2 8 5 0 2006-11-02T08:05:00Z 2006.836539193303 3327-99 1861.75 2.05 78.9067 11.8883 479.0 474.0 5.0 P 225341 H4 2006-11-28T14:24:00 ... ZEP 2006 11 2 8 5 0 2006-11-02T08:05:00Z 2006.836539193303 3328-99 1862.89 2.05 78.9067 11.8883 479.0 474.0 5.0 P 225342 H4 2006-11-28T14:38:00 ... ZEP 2006 11 9 8 0 0 2006-11-09T08:00:00Z 2006.8557077625571 2841-99 1852.49 2.05 78.9067 11.8883 479.0 474.0 5.0 P 225783 H4 2006-12-06T10:48:00 ... ZEP 2006 11 9 8 0 0 2006-11-09T08:00:00Z 2006.8557077625571 2842-99 1851.53 2.05 78.9067 11.8883 479.0 474.0 5.0 P 225784 H4 2006-12-06T11:03:00 ... ZEP 2006 11 16 17 50 0 2006-11-16T17:50:00Z 2006.876008371385 141-99 1867.96 2.05 78.9067 11.8883 479.0 474.0 5.0 P 225781 H4 2006-12-06T10:20:00 ... ZEP 2006 11 16 17 50 0 2006-11-16T17:50:00Z 2006.876008371385 142-99 1865.61 2.05 78.9067 11.8883 479.0 474.0 5.0 P 225782 H4 2006-12-06T10:34:00 ... ZEP 2006 11 30 8 35 0 2006-11-30T08:35:00Z 2006.9133085996955 803-91 1896.66 2.05 78.9067 11.8883 479.0 474.0 5.0 P 226484 H4 2007-01-03T12:38:00 ... ZEP 2006 11 30 8 35 0 2006-11-30T08:35:00Z 2006.9133085996955 804-91 1894.94 2.05 78.9067 11.8883 479.0 474.0 5.0 P 226485 H4 2007-01-03T12:52:00 ... ZEP 2006 12 7 13 0 0 2006-12-07T13:00:00Z 2006.93299086758 2777-99 1875.47 2.05 78.9067 11.8883 479.0 474.0 5.0 P 227668 H4 2007-01-30T17:57:00 ... ZEP 2006 12 7 13 0 0 2006-12-07T13:00:00Z 2006.93299086758 2778-99 1880.3 2.05 78.9067 11.8883 479.0 474.0 5.0 P 227669 H4 2007-01-30T18:11:00 ... ZEP 2006 12 16 11 2 0 2006-12-16T11:02:00Z 2006.9574238964992 613-99 1917.76 2.05 78.9067 11.8883 479.0 474.0 5.0 P 227670 H4 2007-01-30T18:25:00 .S. ZEP 2006 12 16 11 2 0 2006-12-16T11:02:00Z 2006.9574238964992 614-99 1920.05 2.05 78.9067 11.8883 479.0 474.0 5.0 P 227671 H4 2007-01-30T18:39:00 .S. ZEP 2006 12 21 8 0 0 2006-12-21T08:00:00Z 2006.9707762557077 2317-99 1868.34 2.05 78.9067 11.8883 479.0 474.0 5.0 P 229444 H4 2007-02-23T12:31:00 ... ZEP 2006 12 21 8 0 0 2006-12-21T08:00:00Z 2006.9707762557077 2318-99 1869.45 2.05 78.9067 11.8883 479.0 474.0 5.0 P 229445 H4 2007-02-23T12:45:00 ... ZEP 2006 12 28 7 53 0 2006-12-28T07:53:00Z 2006.989941019787 2815-99 1862.02 2.05 78.9067 11.8883 479.0 474.0 5.0 P 229442 H4 2007-02-23T12:02:00 ... ZEP 2006 12 28 7 53 0 2006-12-28T07:53:00Z 2006.989941019787 2816-99 1862.51 2.05 78.9067 11.8883 479.0 474.0 5.0 P 229443 H4 2007-02-23T12:17:00 ... ZEP 2007 1 5 9 36 0 2007-01-05T09:36:00Z 2007.0120547945205 3563-99 1878.25 2.05 78.9067 11.8883 479.0 474.0 5.0 P 229446 H4 2007-02-26T09:35:00 ... ZEP 2007 1 5 9 36 0 2007-01-05T09:36:00Z 2007.0120547945205 3564-99 1876.08 2.05 78.9067 11.8883 479.0 474.0 5.0 P 229447 H4 2007-02-26T09:49:00 ... ZEP 2007 1 12 8 0 0 2007-01-12T08:00:00Z 2007.0310502283105 3193-99 1880.4 2.05 78.9067 11.8883 479.0 474.0 5.0 P 229448 H4 2007-02-26T11:00:00 ... ZEP 2007 1 12 8 0 0 2007-01-12T08:00:00Z 2007.0310502283105 3194-99 1883.71 2.05 78.9067 11.8883 479.0 474.0 5.0 P 229449 H4 2007-02-26T11:14:00 ... ZEP 2007 1 18 8 9 0 2007-01-18T08:09:00Z 2007.0475057077626 793-91 1874.89 2.05 78.9067 11.8883 479.0 474.0 5.0 P 229452 H4 2007-02-26T12:29:00 ... ZEP 2007 1 18 8 9 0 2007-01-18T08:09:00Z 2007.0475057077626 794-91 1877.56 2.05 78.9067 11.8883 479.0 474.0 5.0 P 229453 H4 2007-02-26T12:43:00 ... ZEP 2007 1 25 8 9 0 2007-01-25T08:09:00Z 2007.0666837899544 733-91 1865.58 2.05 78.9067 11.8883 479.0 474.0 5.0 P 229450 H4 2007-02-26T12:57:00 ... ZEP 2007 1 25 8 9 0 2007-01-25T08:09:00Z 2007.0666837899544 734-91 1862.28 2.05 78.9067 11.8883 479.0 474.0 5.0 P 229451 H4 2007-02-26T13:11:00 ... ZEP 2007 2 1 9 35 0 2007-02-01T09:35:00Z 2007.0860254946729 811-91 1885.53 2.05 78.9067 11.8883 479.0 474.0 5.0 P 230249 H4 2007-03-09T14:51:00 ... ZEP 2007 2 1 9 35 0 2007-02-01T09:35:00Z 2007.0860254946729 812-91 1886.84 2.05 78.9067 11.8883 479.0 474.0 5.0 P 230250 H4 2007-03-09T15:05:00 ... ZEP 2007 2 8 12 34 56 2007-02-08T12:34:56Z 2007.1055459157787 783-91 1885.03 2.05 78.9067 11.8883 479.0 474.0 5.0 P 230247 H4 2007-03-12T10:22:00 ... ZEP 2007 2 8 12 34 56 2007-02-08T12:34:56Z 2007.1055459157787 784-91 1884.01 2.05 78.9067 11.8883 479.0 474.0 5.0 P 230248 H4 2007-03-12T10:36:00 ... ZEP 2007 2 15 8 17 0 2007-02-15T08:17:00Z 2007.12423325723 3135-99 1861.39 2.05 78.9067 11.8883 479.0 474.0 5.0 P 230985 H4 2007-03-21T15:58:00 ... ZEP 2007 2 15 8 17 0 2007-02-15T08:17:00Z 2007.12423325723 3136-99 1858.86 2.05 78.9067 11.8883 479.0 474.0 5.0 P 230986 H4 2007-03-21T16:12:00 ... ZEP 2007 2 23 7 53 0 2007-02-23T07:53:00Z 2007.1461054033487 2585-99 1859.93 2.05 78.9067 11.8883 479.0 474.0 5.0 P 230983 H4 2007-03-21T15:29:00 ... ZEP 2007 2 23 7 53 0 2007-02-23T07:53:00Z 2007.1461054033487 2586-99 1859.44 2.05 78.9067 11.8883 479.0 474.0 5.0 P 230984 H4 2007-03-21T15:44:00 ... ZEP 2007 3 1 9 20 0 2007-03-01T09:20:00Z 2007.162709284627 743-91 1869.66 2.05 78.9067 11.8883 479.0 474.0 5.0 P 231728 H4 2007-04-06T14:20:00 ... ZEP 2007 3 1 9 20 0 2007-03-01T09:20:00Z 2007.162709284627 744-91 1871.1 2.05 78.9067 11.8883 479.0 474.0 5.0 P 231729 H4 2007-04-06T14:34:00 ... ZEP 2007 3 9 8 59 0 2007-03-09T08:59:00Z 2007.1845871385083 3581-99 1882.21 2.05 78.9067 11.8883 479.0 474.0 5.0 P 231726 H4 2007-04-06T14:49:00 ... ZEP 2007 3 9 8 59 0 2007-03-09T08:59:00Z 2007.1845871385083 3582-99 1882.78 2.05 78.9067 11.8883 479.0 474.0 5.0 P 231727 H4 2007-04-06T15:03:00 ... ZEP 2007 3 16 9 5 0 2007-03-16T09:05:00Z 2007.2037766362253 2395-99 1861.98 2.05 78.9067 11.8883 479.0 474.0 5.0 P 232575 H4 2007-04-23T12:10:00 ... ZEP 2007 3 16 9 5 0 2007-03-16T09:05:00Z 2007.2037766362253 2396-99 1860.83 2.05 78.9067 11.8883 479.0 474.0 5.0 P 232576 H4 2007-04-23T12:25:00 ... ZEP 2007 3 22 8 0 0 2007-03-22T08:00:00Z 2007.220091324201 6571-66 1868.65 2.05 78.9067 11.8883 479.0 474.0 5.0 P 232577 H4 2007-04-23T11:42:00 ... ZEP 2007 3 22 8 0 0 2007-03-22T08:00:00Z 2007.220091324201 6572-66 1866.4 2.05 78.9067 11.8883 479.0 474.0 5.0 P 232578 H4 2007-04-23T11:56:00 ... ZEP 2007 3 30 12 15 0 2007-03-30T12:15:00Z 2007.2424942922376 3271-99 1869.96 2.05 78.9067 11.8883 479.0 474.0 5.0 P 233128 H4 2007-04-30T16:41:00 ... ZEP 2007 3 30 12 15 0 2007-03-30T12:15:00Z 2007.2424942922376 3272-99 1871.17 2.05 78.9067 11.8883 479.0 474.0 5.0 P 233129 H4 2007-04-30T16:55:00 ... ZEP 2007 4 5 7 15 0 2007-04-05T07:15:00Z 2007.2583618721462 125-99 1878.83 2.05 78.9067 11.8883 479.0 474.0 5.0 P 233126 H4 2007-04-30T16:12:00 ... ZEP 2007 4 5 7 15 0 2007-04-05T07:15:00Z 2007.2583618721462 126-99 1880.19 2.05 78.9067 11.8883 479.0 474.0 5.0 P 233127 H4 2007-04-30T16:26:00 ... ZEP 2007 4 12 7 32 0 2007-04-12T07:32:00Z 2007.2775722983258 6061-66 1868.45 2.05 78.9067 11.8883 479.0 474.0 5.0 P 233999 H4 2007-05-16T14:25:00 ... ZEP 2007 4 12 7 32 0 2007-04-12T07:32:00Z 2007.2775722983258 6062-66 1869.79 2.05 78.9067 11.8883 479.0 474.0 5.0 P 234000 H4 2007-05-16T14:40:00 ... ZEP 2007 4 20 8 12 0 2007-04-20T08:12:00Z 2007.2995662100457 1138-99 1871.89 2.05 78.9067 11.8883 479.0 474.0 5.0 P 233985 H4 2007-05-17T11:06:00 ... ZEP 2007 4 27 7 24 0 2007-04-27T07:24:00Z 2007.3186529680365 803-91 1869.03 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238177 H4 2007-07-12T12:44:00 ... ZEP 2007 4 27 7 24 0 2007-04-27T07:24:00Z 2007.3186529680365 804-91 1866.71 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238178 H4 2007-07-12T12:58:00 ... ZEP 2007 5 4 7 38 0 2007-05-04T07:38:00Z 2007.3378576864536 911-99 1863.0 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238179 H4 2007-07-12T13:13:00 ... ZEP 2007 5 4 7 38 0 2007-05-04T07:38:00Z 2007.3378576864536 912-99 1862.08 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238180 H4 2007-07-12T13:27:00 ... ZEP 2007 5 17 7 18 0 2007-05-17T07:18:00Z 2007.3734360730593 4675-99 1861.37 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238167 H4 2007-07-17T14:40:00 ... ZEP 2007 5 17 7 18 0 2007-05-17T07:18:00Z 2007.3734360730593 4676-99 1861.84 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238168 H4 2007-07-17T14:55:00 ... ZEP 2007 5 24 7 54 0 2007-05-24T07:54:00Z 2007.392682648402 791-91 1853.64 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238165 H4 2007-07-17T14:12:00 ... ZEP 2007 5 24 7 54 0 2007-05-24T07:54:00Z 2007.392682648402 792-91 1852.86 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238166 H4 2007-07-17T14:26:00 ... ZEP 2007 6 1 7 20 0 2007-06-01T07:20:00Z 2007.4145357686455 4077-99 1855.26 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238173 H4 2007-07-12T11:47:00 ..M ZEP 2007 6 1 7 20 0 2007-06-01T07:20:00Z 2007.4145357686455 4077-99 1851.14 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238173 H4 2007-07-12T13:44:00 ... ZEP 2007 6 1 7 20 0 2007-06-01T07:20:00Z 2007.4145357686455 4078-99 -999.99 -999.999 78.9067 11.8883 479.0 474.0 5.0 P 238174 H4 2007-07-12T12:02:00 M.. ZEP 2007 6 1 7 20 0 2007-06-01T07:20:00Z 2007.4145357686455 4078-99 1848.84 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238174 H4 2007-07-12T13:59:00 ... ZEP 2007 6 7 6 50 0 2007-06-07T06:50:00Z 2007.4309170471843 2019-99 -999.99 -999.999 78.9067 11.8883 479.0 474.0 5.0 P 238175 H4 2007-07-12T12:16:00 M.. ZEP 2007 6 7 6 50 0 2007-06-07T06:50:00Z 2007.4309170471843 2019-99 1849.27 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238175 H4 2007-07-12T14:13:00 ... ZEP 2007 6 7 6 50 0 2007-06-07T06:50:00Z 2007.4309170471843 2020-99 2129.66 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238176 H4 2007-07-12T12:30:00 M.M ZEP 2007 6 7 6 50 0 2007-06-07T06:50:00Z 2007.4309170471843 2020-99 1848.71 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238176 H4 2007-07-12T14:27:00 ... ZEP 2007 6 14 7 0 0 2007-06-14T07:00:00Z 2007.4501141552512 1757-99 1845.82 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238169 H4 2007-07-17T15:37:00 ... ZEP 2007 6 14 7 0 0 2007-06-14T07:00:00Z 2007.4501141552512 1758-99 1847.18 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238170 H4 2007-07-17T15:52:00 ... ZEP 2007 6 21 7 8 0 2007-06-21T07:08:00Z 2007.469307458143 6413-66 1855.11 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238171 H4 2007-07-17T15:09:00 ... ZEP 2007 6 21 7 8 0 2007-06-21T07:08:00Z 2007.469307458143 6414-66 1854.09 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238172 H4 2007-07-17T15:23:00 ... ZEP 2007 6 29 9 29 0 2007-06-29T09:29:00Z 2007.4914935312024 811-91 1845.92 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238667 H4 2007-07-25T11:53:00 ... ZEP 2007 6 29 9 29 0 2007-06-29T09:29:00Z 2007.4914935312024 812-91 1843.89 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238668 H4 2007-07-25T12:08:00 ... ZEP 2007 7 5 8 0 0 2007-07-05T08:00:00Z 2007.5077625570775 783-91 1838.94 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238665 H4 2007-07-25T11:25:00 ... ZEP 2007 7 5 8 0 0 2007-07-05T08:00:00Z 2007.5077625570775 784-91 1840.69 2.05 78.9067 11.8883 479.0 474.0 5.0 P 238666 H4 2007-07-25T11:39:00 ... ZEP 2007 7 12 7 50 0 2007-07-12T07:50:00Z 2007.5269216133943 573-99 1847.31 2.05 78.9067 11.8883 479.0 474.0 5.0 P 239424 H4 2007-08-03T14:35:00 ... ZEP 2007 7 12 7 50 0 2007-07-12T07:50:00Z 2007.5269216133943 574-99 1849.27 2.05 78.9067 11.8883 479.0 474.0 5.0 P 239425 H4 2007-08-03T14:50:00 ... ZEP 2007 7 19 7 35 0 2007-07-19T07:35:00Z 2007.5460711567732 1293-99 1851.43 2.05 78.9067 11.8883 479.0 474.0 5.0 P 239422 H4 2007-08-03T14:07:00 ... ZEP 2007 7 19 7 35 0 2007-07-19T07:35:00Z 2007.5460711567732 1294-99 1849.1 2.05 78.9067 11.8883 479.0 474.0 5.0 P 239423 H4 2007-08-03T14:21:00 ... ZEP 2007 7 26 12 34 56 2007-07-26T12:34:56Z 2007.5658198883816 175-99 1837.24 2.05 78.9067 11.8883 479.0 474.0 5.0 P 240462 H4 2007-08-24T13:45:00 ... ZEP 2007 7 26 12 34 56 2007-07-26T12:34:56Z 2007.5658198883816 176-99 1837.4 2.05 78.9067 11.8883 479.0 474.0 5.0 P 240463 H4 2007-08-24T13:59:00 ... ZEP 2007 8 2 7 40 0 2007-08-02T07:40:00Z 2007.5844368340943 4653-99 1854.62 2.05 78.9067 11.8883 479.0 474.0 5.0 P 240465 H4 2007-08-24T14:14:00 ... ZEP 2007 8 2 7 40 0 2007-08-02T07:40:00Z 2007.5844368340943 4654-99 1852.63 2.05 78.9067 11.8883 479.0 474.0 5.0 P 240466 H4 2007-08-24T14:28:00 ... ZEP 2007 8 9 7 30 0 2007-08-09T07:30:00Z 2007.603595890411 3243-99 1845.18 2.05 78.9067 11.8883 479.0 474.0 5.0 P 240845 H4 2007-09-06T11:23:00 ... ZEP 2007 8 9 7 30 0 2007-08-09T07:30:00Z 2007.603595890411 3244-99 1844.72 2.05 78.9067 11.8883 479.0 474.0 5.0 P 240846 H4 2007-09-06T11:37:00 ... ZEP 2007 8 16 7 20 0 2007-08-16T07:20:00Z 2007.6227549467276 6035-66 1852.92 2.05 78.9067 11.8883 479.0 474.0 5.0 P 240843 H4 2007-09-06T10:55:00 ... ZEP 2007 8 16 7 20 0 2007-08-16T07:20:00Z 2007.6227549467276 6036-66 1855.28 2.05 78.9067 11.8883 479.0 474.0 5.0 P 240844 H4 2007-09-06T11:09:00 ... ZEP 2007 8 23 7 22 0 2007-08-23T07:22:00Z 2007.6419368340944 733-91 1881.1 2.05 78.9067 11.8883 479.0 474.0 5.0 P 241503 H4 2007-09-17T17:34:00 ... ZEP 2007 8 23 7 22 0 2007-08-23T07:22:00Z 2007.6419368340944 734-91 1883.05 2.05 78.9067 11.8883 479.0 474.0 5.0 P 241504 H4 2007-09-17T17:48:00 ... ZEP 2007 8 31 8 40 0 2007-08-31T08:40:00Z 2007.66400304414 3631-99 1874.67 2.05 78.9067 11.8883 479.0 474.0 5.0 P 241505 H4 2007-09-18T11:01:00 ... ZEP 2007 8 31 8 40 0 2007-08-31T08:40:00Z 2007.66400304414 3632-99 1873.57 2.05 78.9067 11.8883 479.0 474.0 5.0 P 241506 H4 2007-09-18T10:46:00 ... ZEP 2007 9 6 7 48 0 2007-09-06T07:48:00Z 2007.6803424657535 2689-99 1855.66 2.05 78.9067 11.8883 479.0 474.0 5.0 P 242947 H4 2007-10-10T13:03:00 ... ZEP 2007 9 6 7 48 0 2007-09-06T07:48:00Z 2007.6803424657535 2690-99 1857.52 2.05 78.9067 11.8883 479.0 474.0 5.0 P 242948 H4 2007-10-10T13:18:00 ... ZEP 2007 9 13 9 30 0 2007-09-13T09:30:00Z 2007.6997146118722 744-91 1869.48 2.05 78.9067 11.8883 479.0 474.0 5.0 P 242945 H4 2007-10-10T12:35:00 ... ZEP 2007 9 13 9 30 0 2007-09-13T09:30:00Z 2007.6997146118722 794-91 1872.04 2.05 78.9067 11.8883 479.0 474.0 5.0 P 242946 H4 2007-10-10T12:49:00 ... ZEP 2007 9 20 7 43 0 2007-09-20T07:43:00Z 2007.7186891171993 3909-99 1895.89 2.05 78.9067 11.8883 479.0 474.0 5.0 P 243183 H4 2007-10-15T12:00:00 ... ZEP 2007 9 20 7 43 0 2007-09-20T07:43:00Z 2007.7186891171993 3910-99 1896.34 2.05 78.9067 11.8883 479.0 474.0 5.0 P 243184 H4 2007-10-15T12:14:00 ... ZEP 2007 9 27 6 38 0 2007-09-27T06:38:00Z 2007.7377435312023 339-99 1867.04 2.05 78.9067 11.8883 479.0 474.0 5.0 P 243181 H4 2007-10-15T12:28:00 ... ZEP 2007 9 27 6 38 0 2007-09-27T06:38:00Z 2007.7377435312023 340-99 1867.16 2.05 78.9067 11.8883 479.0 474.0 5.0 P 243182 H4 2007-10-15T12:42:00 ... ZEP 2007 10 4 7 18 0 2007-10-04T07:18:00Z 2007.756997716895 1379-99 1878.02 2.05 78.9067 11.8883 479.0 474.0 5.0 P 243833 H4 2007-10-26T09:37:00 ... ZEP 2007 10 4 7 18 0 2007-10-04T07:18:00Z 2007.756997716895 1380-99 1877.96 2.05 78.9067 11.8883 479.0 474.0 5.0 P 243834 H4 2007-10-26T09:51:00 ... ZEP 2007 10 11 7 16 0 2007-10-11T07:16:00Z 2007.7761719939117 4173-99 1876.47 2.05 78.9067 11.8883 479.0 474.0 5.0 P 243831 H4 2007-10-26T09:09:00 ... ZEP 2007 10 11 7 16 0 2007-10-11T07:16:00Z 2007.7761719939117 4174-99 1874.21 2.05 78.9067 11.8883 479.0 474.0 5.0 P 243832 H4 2007-10-26T09:23:00 ... ZEP 2007 10 18 7 20 0 2007-10-18T07:20:00Z 2007.7953576864536 2633-99 1888.78 2.05 78.9067 11.8883 479.0 474.0 5.0 P 244625 H4 2007-11-09T11:58:00 ... ZEP 2007 10 18 7 20 0 2007-10-18T07:20:00Z 2007.7953576864536 2634-99 1889.45 2.05 78.9067 11.8883 479.0 474.0 5.0 P 244626 H4 2007-11-09T12:12:00 ... ZEP 2007 10 25 7 55 0 2007-10-25T07:55:00Z 2007.8146023592085 2719-99 1878.6 2.05 78.9067 11.8883 479.0 474.0 5.0 P 244623 H4 2007-11-09T11:30:00 ... ZEP 2007 10 25 7 55 0 2007-10-25T07:55:00Z 2007.8146023592085 2720-99 1877.14 2.05 78.9067 11.8883 479.0 474.0 5.0 P 244624 H4 2007-11-09T11:44:00 ... ZEP 2007 11 1 7 55 0 2007-11-01T07:55:00Z 2007.8337804414002 4698-99 1876.48 2.05 78.9067 11.8883 479.0 474.0 5.0 P 245526 H4 2007-11-30T15:52:00 ... ZEP 2007 11 8 8 10 0 2007-11-08T08:10:00Z 2007.852987062405 783-91 1876.78 2.05 78.9067 11.8883 479.0 474.0 5.0 P 245524 H4 2007-11-30T16:06:00 ... ZEP 2007 11 8 8 10 0 2007-11-08T08:10:00Z 2007.852987062405 784-91 1871.11 2.05 78.9067 11.8883 479.0 474.0 5.0 P 245525 H4 2007-11-30T16:20:00 ... ZEP 2007 11 29 8 45 0 2007-11-29T08:45:00Z 2007.9105878995433 733-91 1893.79 2.05 78.9067 11.8883 479.0 474.0 5.0 P 247235 H4 2008-01-08T15:13:00 ... ZEP 2007 11 29 8 45 0 2007-11-29T08:45:00Z 2007.9105878995433 734-91 1895.14 2.05 78.9067 11.8883 479.0 474.0 5.0 P 247236 H4 2008-01-08T15:28:00 ... ZEP 2007 12 6 8 10 0 2007-12-06T08:10:00Z 2007.929699391172 4283-99 1878.28 2.05 78.9067 11.8883 479.0 474.0 5.0 P 247234 H4 2008-01-08T15:42:00 ... ZEP 2007 12 6 8 30 0 2007-12-06T08:30:00Z 2007.9297374429225 811-91 1874.73 1.31 78.9067 11.8883 479.0 474.0 5.0 P 248507 H6 2008-01-28T13:13:00 ... ZEP 2007 12 6 8 30 0 2007-12-06T08:30:00Z 2007.9297374429225 812-91 1873.95 1.31 78.9067 11.8883 479.0 474.0 5.0 P 248508 H6 2008-01-28T13:28:00 ... ZEP 2007 12 13 8 17 0 2007-12-13T08:17:00Z 2007.9488907914765 4639-99 1870.53 1.31 78.9067 11.8883 479.0 474.0 5.0 P 248511 H6 2008-01-28T14:46:00 ... ZEP 2007 12 13 8 17 0 2007-12-13T08:17:00Z 2007.9488907914765 4640-99 1870.68 1.31 78.9067 11.8883 479.0 474.0 5.0 P 248512 H6 2008-01-28T15:01:00 ... ZEP 2007 12 20 8 5 0 2007-12-20T08:05:00Z 2007.968046042618 744-91 1888.13 1.31 78.9067 11.8883 479.0 474.0 5.0 P 248510 H6 2008-01-28T14:30:00 ... ZEP 2007 12 20 8 5 0 2007-12-20T08:05:00Z 2007.968046042618 794-91 1885.53 1.31 78.9067 11.8883 479.0 474.0 5.0 P 248509 H6 2008-01-28T14:15:00 ... ZEP 2007 12 27 8 10 0 2007-12-27T08:10:00Z 2007.9872336377473 791-91 1892.97 1.31 78.9067 11.8883 479.0 474.0 5.0 P 248505 H6 2008-01-28T13:44:00 ... ZEP 2007 12 27 8 10 0 2007-12-27T08:10:00Z 2007.9872336377473 792-91 1893.5 1.31 78.9067 11.8883 479.0 474.0 5.0 P 248506 H6 2008-01-28T13:59:00 ... ZEP 2008 1 3 7 56 0 2008-01-03T07:56:00Z 2008.0063676381299 17-99 1870.68 2.05 78.9067 11.8883 479.0 474.0 5.0 P 249151 H4 2008-02-11T11:30:00 ... ZEP 2008 1 3 7 56 0 2008-01-03T07:56:00Z 2008.0063676381299 18-99 1869.56 2.05 78.9067 11.8883 479.0 474.0 5.0 P 249152 H4 2008-02-11T11:44:00 ... ZEP 2008 1 10 8 47 0 2008-01-10T08:47:00Z 2008.0255900880388 3749-99 1874.51 2.05 78.9067 11.8883 479.0 474.0 5.0 P 249149 H4 2008-02-11T11:58:00 ... ZEP 2008 1 10 8 47 0 2008-01-10T08:47:00Z 2008.0255900880388 3750-99 1877.41 2.05 78.9067 11.8883 479.0 474.0 5.0 P 249150 H4 2008-02-11T12:12:00 ... ZEP 2008 1 17 8 40 0 2008-01-17T08:40:00Z 2008.0447024893747 55-99 1947.33 1.31 78.9067 11.8883 479.0 474.0 5.0 P 249224 H6 2008-02-12T13:35:00 .S. ZEP 2008 1 17 8 40 0 2008-01-17T08:40:00Z 2008.0447024893747 56-99 1945.25 1.31 78.9067 11.8883 479.0 474.0 5.0 P 249225 H6 2008-02-12T13:50:00 .S. ZEP 2008 1 24 9 58 0 2008-01-24T09:58:00Z 2008.0639761687917 2973-99 1877.33 1.31 78.9067 11.8883 479.0 474.0 5.0 P 249222 H6 2008-02-12T13:04:00 ... ZEP 2008 1 24 9 58 0 2008-01-24T09:58:00Z 2008.0639761687917 2974-99 1877.93 1.31 78.9067 11.8883 479.0 474.0 5.0 P 249223 H6 2008-02-12T13:19:00 ... ZEP 2008 1 31 8 0 0 2008-01-31T08:00:00Z 2008.0828779599271 1223-99 1909.91 1.31 78.9067 11.8883 479.0 474.0 5.0 P 251028 H6 2008-03-13T15:43:00 .S. ZEP 2008 1 31 8 0 0 2008-01-31T08:00:00Z 2008.0828779599271 1224-99 1912.27 1.31 78.9067 11.8883 479.0 474.0 5.0 P 251029 H6 2008-03-13T15:59:00 .S. ZEP 2008 2 7 8 3 0 2008-02-07T08:03:00Z 2008.102009335155 1677-99 1878.99 1.31 78.9067 11.8883 479.0 474.0 5.0 P 251030 H6 2008-03-13T16:14:00 ... ZEP 2008 2 7 8 3 0 2008-02-07T08:03:00Z 2008.102009335155 1678-99 1879.77 1.31 78.9067 11.8883 479.0 474.0 5.0 P 251031 H6 2008-03-13T16:29:00 ... ZEP 2008 2 14 8 53 0 2008-02-14T08:53:00Z 2008.1212298876746 485-99 1886.91 1.31 78.9067 11.8883 479.0 474.0 5.0 P 250894 H6 2008-03-14T14:11:00 ... ZEP 2008 2 14 8 53 0 2008-02-14T08:53:00Z 2008.1212298876746 486-99 1886.58 1.31 78.9067 11.8883 479.0 474.0 5.0 P 250895 H6 2008-03-14T14:26:00 ... ZEP 2008 2 21 13 15 0 2008-02-21T13:15:00Z 2008.140852686703 199-99 1872.03 1.31 78.9067 11.8883 479.0 474.0 5.0 P 250892 H6 2008-03-14T13:40:00 ... ZEP 2008 2 21 13 15 0 2008-02-21T13:15:00Z 2008.140852686703 200-99 1870.08 1.31 78.9067 11.8883 479.0 474.0 5.0 P 250893 H6 2008-03-14T13:56:00 ... ZEP 2008 2 28 8 20 0 2008-02-28T08:20:00Z 2008.1594186399514 4983-99 1874.86 2.05 78.9067 11.8883 479.0 474.0 5.0 P 251517 H4 2008-03-27T12:10:00 ... ZEP 2008 2 28 8 20 0 2008-02-28T08:20:00Z 2008.1594186399514 4984-99 1875.07 2.05 78.9067 11.8883 479.0 474.0 5.0 P 251518 H4 2008-03-27T12:25:00 ... ZEP 2008 3 6 8 0 0 2008-03-06T08:00:00Z 2008.1785063752277 4987-99 1914.17 2.05 78.9067 11.8883 479.0 474.0 5.0 P 251515 H4 2008-03-27T12:39:00 .S. ZEP 2008 3 6 8 0 0 2008-03-06T08:00:00Z 2008.1785063752277 4988-99 1916.75 2.05 78.9067 11.8883 479.0 474.0 5.0 P 251516 H4 2008-03-27T12:53:00 .S. ZEP 2008 3 13 8 6 0 2008-03-13T08:06:00Z 2008.1976434426228 563-99 1905.18 1.31 78.9067 11.8883 479.0 474.0 5.0 P 252622 H6 2008-04-17T11:38:00 ... ZEP 2008 3 13 8 6 0 2008-03-13T08:06:00Z 2008.1976434426228 564-99 1904.36 1.31 78.9067 11.8883 479.0 474.0 5.0 P 252623 H6 2008-04-17T11:54:00 ... ZEP 2008 3 20 11 0 0 2008-03-20T11:00:00Z 2008.2170992714025 2067-99 1899.8 2.05 78.9067 11.8883 479.0 474.0 5.0 P 252620 H4 2008-04-17T11:36:00 ... ZEP 2008 3 20 11 0 0 2008-03-20T11:00:00Z 2008.2170992714025 2068-99 1897.6 2.05 78.9067 11.8883 479.0 474.0 5.0 P 252621 H4 2008-04-17T11:51:00 ... ZEP 2008 3 27 8 21 0 2008-03-27T08:21:00Z 2008.235923269581 621-99 1909.1 1.31 78.9067 11.8883 479.0 474.0 5.0 P 252952 H6 2008-04-22T13:44:00 ... ZEP 2008 3 27 8 21 0 2008-03-27T08:21:00Z 2008.235923269581 622-99 1910.26 1.31 78.9067 11.8883 479.0 474.0 5.0 P 252953 H6 2008-04-22T13:59:00 ... ZEP 2008 4 3 7 54 0 2008-04-03T07:54:00Z 2008.2549977231329 2035-99 1881.43 1.31 78.9067 11.8883 479.0 474.0 5.0 P 252950 H6 2008-04-23T10:06:00 ... ZEP 2008 4 3 7 54 0 2008-04-03T07:54:00Z 2008.2549977231329 2036-99 1884.13 1.31 78.9067 11.8883 479.0 474.0 5.0 P 252951 H6 2008-04-23T10:21:00 ... ZEP 2008 4 10 7 40 0 2008-04-10T07:40:00Z 2008.2740968427445 4491-99 1873.45 1.31 78.9067 11.8883 479.0 474.0 5.0 P 254219 H6 2008-05-16T12:14:00 ... ZEP 2008 4 10 7 40 0 2008-04-10T07:40:00Z 2008.2740968427445 4492-99 1873.8 1.31 78.9067 11.8883 479.0 474.0 5.0 P 254220 H6 2008-05-16T12:30:00 ... ZEP 2008 4 24 6 53 0 2008-04-24T06:53:00Z 2008.3122590315725 791-91 1885.02 1.31 78.9067 11.8883 479.0 474.0 5.0 P 254417 H6 2008-05-21T09:48:00 ... ZEP 2008 4 24 6 53 0 2008-04-24T06:53:00Z 2008.3122590315725 792-91 1882.09 1.31 78.9067 11.8883 479.0 474.0 5.0 P 254418 H6 2008-05-21T10:04:00 ... ZEP 2008 5 1 6 44 0 2008-05-01T06:44:00Z 2008.33136763813 811-91 1867.94 1.31 78.9067 11.8883 479.0 474.0 5.0 P 254415 H6 2008-05-21T09:17:00 ... ZEP 2008 5 1 6 44 0 2008-05-01T06:44:00Z 2008.33136763813 812-91 1869.62 1.31 78.9067 11.8883 479.0 474.0 5.0 P 254416 H6 2008-05-21T09:33:00 ... ZEP 2008 5 8 7 10 0 2008-05-08T07:10:00Z 2008.350542653309 169-99 1870.85 1.31 78.9067 11.8883 479.0 474.0 5.0 P 255522 H6 2008-06-12T08:18:00 ... ZEP 2008 5 15 7 25 0 2008-05-15T07:25:00Z 2008.369696797207 4798-99 1876.16 1.31 78.9067 11.8883 479.0 474.0 5.0 P 255521 H6 2008-06-12T08:33:00 ... ZEP 2008 5 22 7 17 0 2008-05-22T07:17:00Z 2008.3888073011535 2179-99 1860.01 1.31 78.9067 11.8883 479.0 474.0 5.0 P 256037 H6 2008-06-19T14:50:00 ... ZEP 2008 5 22 7 17 0 2008-05-22T07:17:00Z 2008.3888073011535 2180-99 1860.85 1.31 78.9067 11.8883 479.0 474.0 5.0 P 256038 H6 2008-06-19T15:05:00 ... ZEP 2008 5 29 6 50 0 2008-05-29T06:50:00Z 2008.4078817547056 4063-99 1860.46 1.31 78.9067 11.8883 479.0 474.0 5.0 P 256035 H6 2008-06-19T14:19:00 ... ZEP 2008 5 29 6 50 0 2008-05-29T06:50:00Z 2008.4078817547056 4064-99 1860.6 1.31 78.9067 11.8883 479.0 474.0 5.0 P 256036 H6 2008-06-19T14:35:00 ... ZEP 2008 6 5 7 14 0 2008-06-05T07:14:00Z 2008.4270529751063 1285-99 1853.89 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260562 H6 2008-09-12T15:16:00 ... ZEP 2008 6 5 7 14 0 2008-06-05T07:14:00Z 2008.4270529751063 1286-99 1853.77 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260563 H6 2008-09-12T15:31:00 ... ZEP 2008 6 12 6 55 0 2008-06-12T06:55:00Z 2008.4461426077717 1977-99 1853.86 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260564 H6 2008-09-15T11:14:00 ... ZEP 2008 6 12 6 55 0 2008-06-12T06:55:00Z 2008.4461426077717 1978-99 1855.76 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260565 H6 2008-09-15T11:29:00 ... ZEP 2008 6 19 7 50 0 2008-06-19T07:50:00Z 2008.4653726472375 6345-66 1855.5 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260542 H6 2008-09-16T09:36:00 ... ZEP 2008 6 19 7 50 0 2008-06-19T07:50:00Z 2008.4653726472375 6346-66 1855.5 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260543 H6 2008-09-16T09:51:00 ... ZEP 2008 6 26 12 40 0 2008-06-26T12:40:00Z 2008.4850485731633 3749-99 1852.07 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260540 H6 2008-09-16T10:07:00 ... ZEP 2008 6 26 12 40 0 2008-06-26T12:40:00Z 2008.4850485731633 3750-99 1852.62 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260541 H6 2008-09-16T10:22:00 ... ZEP 2008 7 3 7 35 0 2008-07-03T07:35:00Z 2008.5035955525198 487-99 1845.0 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260536 H6 2008-09-15T15:51:00 ... ZEP 2008 7 3 7 35 0 2008-07-03T07:35:00Z 2008.5035955525198 488-99 1846.58 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260537 H6 2008-09-15T16:06:00 ... ZEP 2008 7 17 7 30 0 2008-07-17T07:30:00Z 2008.541837431694 3649-99 1840.69 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260538 H6 2008-09-15T16:22:00 ... ZEP 2008 7 17 7 30 0 2008-07-17T07:30:00Z 2008.541837431694 3650-99 1841.53 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260539 H6 2008-09-15T16:37:00 ... ZEP 2008 7 27 10 28 0 2008-07-27T10:28:00Z 2008.5694975713418 947-99 1831.4 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260560 H6 2008-09-12T14:14:00 ... ZEP 2008 7 27 10 28 0 2008-07-27T10:28:00Z 2008.5694975713418 948-99 1831.39 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260561 H6 2008-09-12T14:30:00 ... ZEP 2008 7 31 8 28 0 2008-07-31T08:28:00Z 2008.5801988463875 4733-99 1836.47 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260558 H6 2008-09-12T14:45:00 ... ZEP 2008 7 31 8 28 0 2008-07-31T08:28:00Z 2008.5801988463875 4734-99 1835.26 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260559 H6 2008-09-12T15:00:00 ... ZEP 2008 8 7 7 40 0 2008-08-07T07:40:00Z 2008.5992334547661 733-91 1849.37 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260528 H6 2008-09-15T13:48:00 ... ZEP 2008 8 7 7 40 0 2008-08-07T07:40:00Z 2008.5992334547661 734-91 1849.98 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260529 H6 2008-09-15T14:03:00 ... ZEP 2008 8 14 8 35 0 2008-08-14T08:35:00Z 2008.618463494232 744-91 1845.08 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260530 H6 2008-09-15T14:19:00 ... ZEP 2008 8 14 8 35 0 2008-08-14T08:35:00Z 2008.618463494232 794-91 1843.06 1.31 78.9067 11.8883 479.0 474.0 5.0 P 260531 H6 2008-09-15T14:34:00 ... ZEP 2008 8 21 7 25 0 2008-08-21T07:25:00Z 2008.6374563600486 783-91 1840.88 1.31 78.9067 11.8883 479.0 474.0 5.0 P 263737 H6 2008-11-12T11:44:00 ... ZEP 2008 8 21 7 25 0 2008-08-21T07:25:00Z 2008.6374563600486 784-91 1841.7 1.31 78.9067 11.8883 479.0 474.0 5.0 P 263738 H6 2008-11-12T12:00:00 ... ZEP 2008 8 31 11 35 0 2008-08-31T11:35:00Z 2008.6652531117184 4985-99 1849.56 1.31 78.9067 11.8883 479.0 474.0 5.0 P 263735 H6 2008-11-12T12:15:00 ... ZEP 2008 8 31 11 35 0 2008-08-31T11:35:00Z 2008.6652531117184 4986-99 1849.35 1.31 78.9067 11.8883 479.0 474.0 5.0 P 263736 H6 2008-11-12T12:30:00 ... ZEP 2008 9 11 14 25 0 2008-09-11T14:25:00Z 2008.6956303126897 2397-99 1845.63 1.31 78.9067 11.8883 479.0 474.0 5.0 P 263991 H6 2008-11-19T15:46:00 ... ZEP 2008 9 11 14 25 0 2008-09-11T14:25:00Z 2008.6956303126897 2398-99 1846.21 1.31 78.9067 11.8883 479.0 474.0 5.0 P 263992 H6 2008-11-19T16:02:00 ... ZEP 2008 9 18 7 10 0 2008-09-18T07:10:00Z 2008.7139306314511 1087-99 1860.3 1.31 78.9067 11.8883 479.0 474.0 5.0 P 263989 H6 2008-11-19T16:17:00 ... ZEP 2008 9 18 7 10 0 2008-09-18T07:10:00Z 2008.7139306314511 1088-99 1864.63 1.31 78.9067 11.8883 479.0 474.0 5.0 P 263990 H6 2008-11-19T16:33:00 ... ZEP 2008 10 31 9 35 0 2008-10-31T09:35:00Z 2008.8316920916818 3261-99 1873.96 1.31 78.9067 11.8883 479.0 474.0 5.0 P 270602 H6 2009-03-05T11:03:00 ... ZEP 2008 10 31 9 35 0 2008-10-31T09:35:00Z 2008.8316920916818 3262-99 1874.41 1.31 78.9067 11.8883 479.0 474.0 5.0 P 270603 H6 2009-03-05T11:19:00 ... ZEP 2008 11 6 8 55 0 2008-11-06T08:55:00Z 2008.848009638737 3407-99 1879.63 1.31 78.9067 11.8883 479.0 474.0 5.0 P 267194 H6 2009-01-13T10:54:00 ... ZEP 2008 11 6 8 55 0 2008-11-06T08:55:00Z 2008.848009638737 3408-99 1879.06 1.31 78.9067 11.8883 479.0 474.0 5.0 P 267195 H6 2009-01-13T11:10:00 ... ZEP 2008 11 13 8 30 0 2008-11-13T08:30:00Z 2008.8670878870673 2313-99 1890.54 1.31 78.9067 11.8883 479.0 474.0 5.0 P 267192 H6 2009-01-13T10:24:00 ... ZEP 2008 11 13 8 30 0 2008-11-13T08:30:00Z 2008.8670878870673 2314-99 1887.64 1.31 78.9067 11.8883 479.0 474.0 5.0 P 267193 H6 2009-01-13T10:39:00 ... ZEP 2008 11 20 9 28 0 2008-11-20T09:28:00Z 2008.8863236187008 1273-99 1895.37 2.05 78.9067 11.8883 479.0 474.0 5.0 P 268379 H4 2009-01-30T13:17:00 ... ZEP 2008 11 20 9 28 0 2008-11-20T09:28:00Z 2008.8863236187008 1274-99 1895.02 2.05 78.9067 11.8883 479.0 474.0 5.0 P 268380 H4 2009-01-30T13:31:00 ... ZEP 2008 11 27 8 20 0 2008-11-27T08:20:00Z 2008.9053202792957 3191-99 1884.52 2.05 78.9067 11.8883 479.0 474.0 5.0 P 268377 H4 2009-01-30T13:45:00 ... ZEP 2008 11 27 8 20 0 2008-11-27T08:20:00Z 2008.9053202792957 3192-99 1885.01 2.05 78.9067 11.8883 479.0 474.0 5.0 P 268378 H4 2009-01-30T14:00:00 ... ZEP 2008 12 4 8 22 0 2008-12-04T08:22:00Z 2008.9244497571342 3159-99 1868.85 1.31 78.9067 11.8883 479.0 474.0 5.0 P 270600 H6 2009-03-04T16:24:00 ... ZEP 2008 12 4 8 22 0 2008-12-04T08:22:00Z 2008.9244497571342 3160-99 1870.81 1.31 78.9067 11.8883 479.0 474.0 5.0 P 270601 H6 2009-03-04T16:40:00 ... ZEP 2008 12 11 9 47 0 2008-12-11T09:47:00Z 2008.9437367182757 1617-99 1878.95 1.31 78.9067 11.8883 479.0 474.0 5.0 P 270598 H6 2009-03-05T10:32:00 ... ZEP 2008 12 11 9 47 0 2008-12-11T09:47:00Z 2008.9437367182757 1618-99 1878.42 1.31 78.9067 11.8883 479.0 474.0 5.0 P 270599 H6 2009-03-05T10:48:00 ... ZEP 2008 12 18 8 15 0 2008-12-18T08:15:00Z 2008.96268784153 4843-99 1873.13 2.05 78.9067 11.8883 479.0 474.0 5.0 P 268375 H4 2009-01-30T12:48:00 ... ZEP 2008 12 18 8 15 0 2008-12-18T08:15:00Z 2008.96268784153 4844-99 1875.14 2.05 78.9067 11.8883 479.0 474.0 5.0 P 268376 H4 2009-01-30T13:03:00 ... ZEP 2009 1 1 16 10 0 2009-01-01T16:10:00Z 2009.0018455098934 2121-99 1921.11 2.05 78.9067 11.8883 479.0 474.0 5.0 P 268373 H4 2009-01-30T12:20:00 .S. ZEP 2009 1 1 16 10 0 2009-01-01T16:10:00Z 2009.0018455098934 2122-99 1921.33 2.05 78.9067 11.8883 479.0 474.0 5.0 P 268374 H4 2009-01-30T12:34:00 .S. ZEP 2009 1 9 8 55 0 2009-01-09T08:55:00Z 2009.0229356925418 4273-99 1895.69 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275541 H6 2009-05-19T14:00:00 ... ZEP 2009 1 9 8 55 0 2009-01-09T08:55:00Z 2009.0229356925418 4274-99 1894.14 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275542 H6 2009-05-19T14:16:00 ... ZEP 2009 1 15 8 25 0 2009-01-15T08:25:00Z 2009.0393169710808 3011-99 1896.03 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275543 H6 2009-05-19T14:31:00 ... ZEP 2009 1 15 8 25 0 2009-01-15T08:25:00Z 2009.0393169710808 3012-99 1896.29 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275544 H6 2009-05-19T14:46:00 ... ZEP 2009 1 22 8 32 0 2009-01-22T08:32:00Z 2009.0585083713852 701-99 1896.48 1.31 78.9067 11.8883 479.0 474.0 5.0 P 270604 H6 2009-03-05T10:02:00 ... ZEP 2009 1 22 8 32 0 2009-01-22T08:32:00Z 2009.0585083713852 702-99 1894.59 1.31 78.9067 11.8883 479.0 474.0 5.0 P 270605 H6 2009-03-05T10:17:00 ... ZEP 2009 1 29 8 38 0 2009-01-29T08:38:00Z 2009.077697869102 2205-99 1900.31 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275547 H6 2009-05-19T15:33:00 ... ZEP 2009 1 29 8 38 0 2009-01-29T08:38:00Z 2009.077697869102 2206-99 1900.2 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275548 H6 2009-05-19T15:48:00 ... ZEP 2009 2 5 9 4 0 2009-02-05T09:04:00Z 2009.0969254185693 3961-99 1891.99 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275545 H6 2009-05-19T15:02:00 ... ZEP 2009 2 5 9 4 0 2009-02-05T09:04:00Z 2009.0969254185693 3962-99 1892.28 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275546 H6 2009-05-19T15:17:00 ... ZEP 2009 2 12 9 47 0 2009-02-12T09:47:00Z 2009.1161853120243 803-91 1922.68 2.05 78.9067 11.8883 479.0 474.0 5.0 P 276528 H4 2009-06-18T13:53:00 ... ZEP 2009 2 12 9 47 0 2009-02-12T09:47:00Z 2009.1161853120243 804-91 1922.08 2.05 78.9067 11.8883 479.0 474.0 5.0 P 276529 H4 2009-06-18T14:07:00 ... ZEP 2009 2 23 9 35 0 2009-02-23T09:35:00Z 2009.1462994672754 743-91 1896.08 2.05 78.9067 11.8883 479.0 474.0 5.0 P 276526 H4 2009-06-18T13:25:00 ... ZEP 2009 2 23 9 35 0 2009-02-23T09:35:00Z 2009.1462994672754 793-91 1897.74 2.05 78.9067 11.8883 479.0 474.0 5.0 P 276527 H4 2009-06-18T13:39:00 ... ZEP 2009 3 5 8 25 0 2009-03-05T08:25:00Z 2009.173563546423 3233-99 1897.42 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275509 H6 2009-05-19T16:03:00 ... ZEP 2009 3 5 8 25 0 2009-03-05T08:25:00Z 2009.173563546423 3234-99 1897.86 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275510 H6 2009-05-19T16:19:00 ... ZEP 2009 3 13 8 40 0 2009-03-13T08:40:00Z 2009.1955098934552 531-99 1902.05 2.05 78.9067 11.8883 479.0 474.0 5.0 P 275511 H4 2009-05-19T16:10:00 ... ZEP 2009 3 13 8 40 0 2009-03-13T08:40:00Z 2009.1955098934552 532-99 1901.96 2.05 78.9067 11.8883 479.0 474.0 5.0 P 275512 H4 2009-05-19T16:24:00 ... ZEP 2009 3 19 9 53 0 2009-03-19T09:53:00Z 2009.2120871385084 3983-99 1893.0 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275513 H6 2009-05-20T10:29:00 ... ZEP 2009 3 19 9 53 0 2009-03-19T09:53:00Z 2009.2120871385084 3984-99 1892.99 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275514 H6 2009-05-20T10:45:00 ... ZEP 2009 3 26 9 3 0 2009-03-26T09:03:00Z 2009.2311700913242 744-91 1899.75 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275515 H6 2009-05-20T11:00:00 ... ZEP 2009 3 26 9 3 0 2009-03-26T09:03:00Z 2009.2311700913242 794-91 1898.05 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275516 H6 2009-05-20T11:16:00 ... ZEP 2009 4 3 8 10 0 2009-04-03T08:10:00Z 2009.2529870624048 811-91 1886.97 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275656 H6 2009-05-22T13:00:00 ... ZEP 2009 4 3 8 10 0 2009-04-03T08:10:00Z 2009.2529870624048 812-91 1885.65 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275657 H6 2009-05-22T13:16:00 ... ZEP 2009 4 11 13 10 0 2009-04-11T13:10:00Z 2009.2754756468798 791-91 1887.5 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275654 H6 2009-05-22T13:31:00 ... ZEP 2009 4 11 13 10 0 2009-04-11T13:10:00Z 2009.2754756468798 792-91 1888.39 1.31 78.9067 11.8883 479.0 474.0 5.0 P 275655 H6 2009-05-22T13:47:00 ... ZEP 2009 4 16 7 45 0 2009-04-16T07:45:00Z 2009.288555936073 2025-99 1895.8 1.31 78.9067 11.8883 479.0 474.0 5.0 P 276532 H6 2009-06-18T14:19:00 ... ZEP 2009 4 16 7 45 0 2009-04-16T07:45:00Z 2009.288555936073 2026-99 1894.16 1.31 78.9067 11.8883 479.0 474.0 5.0 P 276533 H6 2009-06-18T14:34:00 ... ZEP 2009 4 23 8 50 0 2009-04-23T08:50:00Z 2009.3078576864536 4647-99 1891.33 1.31 78.9067 11.8883 479.0 474.0 5.0 P 276530 H6 2009-06-18T14:49:00 ... ZEP 2009 4 23 8 50 0 2009-04-23T08:50:00Z 2009.3078576864536 4648-99 1890.74 1.31 78.9067 11.8883 479.0 474.0 5.0 P 276531 H6 2009-06-18T15:05:00 ... ZEP 2009 5 4 8 55 0 2009-05-04T08:55:00Z 2009.3380041856926 369-99 1878.29 2.05 78.9067 11.8883 479.0 474.0 5.0 P 280638 H4 2009-08-05T13:30:00 ... ZEP 2009 5 4 8 55 0 2009-05-04T08:55:00Z 2009.3380041856926 370-99 1876.1 2.05 78.9067 11.8883 479.0 474.0 5.0 P 280639 H4 2009-08-05T13:44:00 ... ZEP 2009 5 4 9 28 0 2009-05-04T09:28:00Z 2009.3380669710807 2615-99 1861.71 1.31 78.9067 11.8883 479.0 474.0 5.0 P 280219 H6 2009-07-29T16:58:00 ... ZEP 2009 5 4 9 28 0 2009-05-04T09:28:00Z 2009.3380669710807 2616-99 1860.6 1.31 78.9067 11.8883 479.0 474.0 5.0 P 280220 H6 2009-07-29T17:13:00 ... ZEP 2009 5 7 8 45 0 2009-05-07T08:45:00Z 2009.3462043378995 855-99 1882.6 2.05 78.9067 11.8883 479.0 474.0 5.0 P 280640 H4 2009-08-05T13:02:00 ... ZEP 2009 5 7 8 45 0 2009-05-07T08:45:00Z 2009.3462043378995 856-99 1882.46 2.05 78.9067 11.8883 479.0 474.0 5.0 P 280641 H4 2009-08-05T13:16:00 ... ZEP 2009 5 21 9 2 0 2009-05-21T09:02:00Z 2009.3845928462708 3737-99 1864.32 1.31 78.9067 11.8883 479.0 474.0 5.0 P 279377 H6 2009-07-21T15:55:00 ... ZEP 2009 5 21 9 2 0 2009-05-21T09:02:00Z 2009.3845928462708 3738-99 1864.09 1.31 78.9067 11.8883 479.0 474.0 5.0 P 279378 H6 2009-07-21T16:11:00 ... ZEP 2009 5 28 7 53 0 2009-05-28T07:53:00Z 2009.403639649924 2131-99 1866.08 2.05 78.9067 11.8883 479.0 474.0 5.0 P 280221 H4 2009-07-29T16:56:00 ... ZEP 2009 5 28 7 53 0 2009-05-28T07:53:00Z 2009.403639649924 2132-99 1868.03 2.05 78.9067 11.8883 479.0 474.0 5.0 P 280222 H4 2009-07-29T17:10:00 ... ZEP 2009 6 11 7 22 0 2009-06-11T07:22:00Z 2009.4419368340943 389-99 1862.8 2.05 78.9067 11.8883 479.0 474.0 5.0 P 279278 H4 2009-07-21T13:51:00 ... ZEP 2009 6 11 7 22 0 2009-06-11T07:22:00Z 2009.4419368340943 390-99 1861.87 2.05 78.9067 11.8883 479.0 474.0 5.0 P 279279 H4 2009-07-21T14:05:00 ... ZEP 2009 6 18 7 55 0 2009-06-18T07:55:00Z 2009.4611777016744 3839-99 1865.32 2.05 78.9067 11.8883 479.0 474.0 5.0 P 279280 H4 2009-07-21T13:22:00 ... ZEP 2009 6 18 7 55 0 2009-06-18T07:55:00Z 2009.4611777016744 3840-99 1862.39 2.05 78.9067 11.8883 479.0 474.0 5.0 P 279281 H4 2009-07-21T13:37:00 ... ZEP 2009 6 25 7 32 0 2009-06-25T07:32:00Z 2009.4803120243532 1229-99 1856.04 2.05 78.9067 11.8883 479.0 474.0 5.0 P 281682 H4 2009-08-25T09:52:00 ... ZEP 2009 6 25 7 32 0 2009-06-25T07:32:00Z 2009.4803120243532 1230-99 1852.74 2.05 78.9067 11.8883 479.0 474.0 5.0 P 281683 H4 2009-08-25T10:06:00 ... ZEP 2009 7 3 7 55 0 2009-07-03T07:55:00Z 2009.5022735920852 583-99 1851.41 2.05 78.9067 11.8883 479.0 474.0 5.0 P 281680 H4 2009-08-25T10:49:00 ... ZEP 2009 7 3 7 55 0 2009-07-03T07:55:00Z 2009.5022735920852 584-99 1850.05 2.05 78.9067 11.8883 479.0 474.0 5.0 P 281681 H4 2009-08-25T11:03:00 ... ZEP 2009 7 12 10 5 0 2009-07-12T10:05:00Z 2009.5271784627093 3417-99 1844.21 1.31 78.9067 11.8883 479.0 474.0 5.0 P 281649 H6 2009-08-20T11:37:00 ... ZEP 2009 7 12 10 5 0 2009-07-12T10:05:00Z 2009.5271784627093 3418-99 1844.03 1.31 78.9067 11.8883 479.0 474.0 5.0 P 281650 H6 2009-08-20T11:53:00 ... ZEP 2009 7 17 10 5 0 2009-07-17T10:05:00Z 2009.5408770928464 4757-99 1847.44 1.31 78.9067 11.8883 479.0 474.0 5.0 P 281651 H6 2009-08-20T12:08:00 ... ZEP 2009 7 17 10 5 0 2009-07-17T10:05:00Z 2009.5408770928464 4758-99 1847.67 1.31 78.9067 11.8883 479.0 474.0 5.0 P 281652 H6 2009-08-20T12:23:00 ... ZEP 2009 7 23 7 25 0 2009-07-23T07:25:00Z 2009.5570110350077 4575-99 1860.07 2.05 78.9067 11.8883 479.0 474.0 5.0 P 281686 H4 2009-08-25T11:46:00 ... ZEP 2009 7 23 7 25 0 2009-07-23T07:25:00Z 2009.5570110350077 4576-99 1859.99 2.05 78.9067 11.8883 479.0 474.0 5.0 P 281687 H4 2009-08-25T12:00:00 ... ZEP 2009 7 30 7 39 0 2009-07-30T07:39:00Z 2009.5762157534245 3591-99 1879.24 2.05 78.9067 11.8883 479.0 474.0 5.0 P 281684 H4 2009-08-25T11:17:00 ... ZEP 2009 7 30 7 39 0 2009-07-30T07:39:00Z 2009.5762157534245 3592-99 1878.93 2.05 78.9067 11.8883 479.0 474.0 5.0 P 281685 H4 2009-08-25T11:31:00 ... ZEP 2009 8 10 7 50 0 2009-08-10T07:50:00Z 2009.6063736681888 833-99 1860.16 1.31 78.9067 11.8883 479.0 474.0 5.0 P 282944 H6 2009-09-08T13:24:00 ... ZEP 2009 8 10 7 50 0 2009-08-10T07:50:00Z 2009.6063736681888 834-99 1861.61 1.31 78.9067 11.8883 479.0 474.0 5.0 P 282945 H6 2009-09-08T13:39:00 ... ZEP 2009 8 17 8 45 0 2009-08-17T08:45:00Z 2009.625656392694 3689-99 1848.71 1.31 78.9067 11.8883 479.0 474.0 5.0 P 282946 H6 2009-09-08T12:53:00 ... ZEP 2009 8 17 8 45 0 2009-08-17T08:45:00Z 2009.625656392694 3690-99 1847.5 1.31 78.9067 11.8883 479.0 474.0 5.0 P 282947 H6 2009-09-08T13:08:00 ... ZEP 2009 8 22 10 12 0 2009-08-22T10:12:00Z 2009.6395205479453 2329-99 1858.71 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287560 H6 2009-12-14T12:34:00 ... ZEP 2009 8 22 10 12 0 2009-08-22T10:12:00Z 2009.6395205479453 2330-99 1858.91 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287561 H6 2009-12-14T12:49:00 ... ZEP 2009 9 3 9 18 0 2009-09-03T09:18:00Z 2009.672294520548 733-91 1875.13 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287562 H6 2009-12-14T12:03:00 ... ZEP 2009 9 3 9 18 0 2009-09-03T09:18:00Z 2009.672294520548 734-91 1876.01 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287563 H6 2009-12-14T12:19:00 ... ZEP 2009 9 10 8 16 0 2009-09-10T08:16:00Z 2009.6913546423136 4918-99 1858.36 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291580 H6 2010-03-11T15:36:00 ... ZEP 2009 9 11 9 30 0 2009-09-11T09:30:00Z 2009.6942351598173 3889-99 1857.31 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291578 H6 2010-03-11T15:05:00 ... ZEP 2009 9 11 9 30 0 2009-09-11T09:30:00Z 2009.6942351598173 3890-99 1856.48 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291579 H6 2010-03-11T15:21:00 ... ZEP 2009 9 17 8 5 0 2009-09-17T08:05:00Z 2009.7105117960425 2739-99 1869.97 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287542 H6 2009-12-10T17:24:00 ... ZEP 2009 9 17 8 5 0 2009-09-17T08:05:00Z 2009.7105117960425 2740-99 1867.06 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287543 H6 2009-12-10T17:40:00 ... ZEP 2009 9 24 8 10 0 2009-09-24T08:10:00Z 2009.729699391172 1149-99 1872.23 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287540 H6 2009-12-10T17:55:00 ... ZEP 2009 9 24 8 10 0 2009-09-24T08:10:00Z 2009.729699391172 1150-99 1871.01 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287541 H6 2009-12-10T18:10:00 ... ZEP 2009 10 1 8 55 0 2009-10-01T08:55:00Z 2009.7489630898021 2511-99 1884.05 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287558 H6 2009-12-14T11:32:00 ... ZEP 2009 10 1 8 55 0 2009-10-01T08:55:00Z 2009.7489630898021 2512-99 1885.51 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287559 H6 2009-12-14T11:48:00 ... ZEP 2009 10 8 9 2 0 2009-10-08T09:02:00Z 2009.7681544901066 2929-99 1888.13 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287556 H6 2009-12-14T10:31:00 ... ZEP 2009 10 8 9 2 0 2009-10-08T09:02:00Z 2009.7681544901066 2930-99 1885.38 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287557 H6 2009-12-14T10:46:00 ... ZEP 2009 10 15 10 46 0 2009-10-15T10:46:00Z 2009.7875304414003 3199-99 1879.05 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287546 H6 2009-12-11T10:44:00 ... ZEP 2009 10 15 10 46 0 2009-10-15T10:46:00Z 2009.7875304414003 3200-99 1879.07 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287547 H6 2009-12-11T10:59:00 ... ZEP 2009 10 26 15 3 0 2009-10-26T15:03:00Z 2009.8181563926942 2683-99 1887.79 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287544 H6 2009-12-10T18:26:00 ... ZEP 2009 10 26 15 3 0 2009-10-26T15:03:00Z 2009.8181563926942 2684-99 1888.83 1.31 78.9067 11.8883 479.0 474.0 5.0 P 287545 H6 2009-12-10T18:41:00 ... ZEP 2009 10 30 15 7 0 2009-10-30T15:07:00Z 2009.8291229071538 3921-99 1908.54 1.31 78.9067 11.8883 479.0 474.0 5.0 P 319594 H6 2011-06-24T12:01:00 C.. ZEP 2009 10 30 15 7 0 2009-10-30T15:07:00Z 2009.8291229071538 3922-99 1884.37 1.31 78.9067 11.8883 479.0 474.0 5.0 P 319595 H6 2011-06-24T12:17:00 C.. ZEP 2009 12 4 9 45 0 2009-12-04T09:45:00Z 2009.9244006849315 4849-99 1887.04 1.31 78.9067 11.8883 479.0 474.0 5.0 P 319596 H6 2011-06-24T12:34:00 ... ZEP 2009 12 4 9 45 0 2009-12-04T09:45:00Z 2009.9244006849315 4850-99 1885.9 1.31 78.9067 11.8883 479.0 474.0 5.0 P 319597 H6 2011-06-24T12:50:00 ... ZEP 2009 12 10 9 42 0 2009-12-10T09:42:00Z 2009.9408333333333 4927-99 1892.84 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291460 H6 2010-03-10T10:13:00 ... ZEP 2009 12 10 9 42 0 2009-12-10T09:42:00Z 2009.9408333333333 4928-99 1891.83 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291461 H6 2010-03-10T10:28:00 ... ZEP 2009 12 24 10 15 0 2009-12-24T10:15:00Z 2009.979252283105 1413-99 1896.26 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291462 H6 2010-03-11T15:51:00 ... ZEP 2009 12 31 8 17 0 2009-12-31T08:17:00Z 2009.9982058599696 2301-99 1960.25 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291569 H6 2010-03-11T10:30:00 .S. ZEP 2009 12 31 8 17 0 2009-12-31T08:17:00Z 2009.9982058599696 2302-99 1960.53 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291568 H6 2010-03-11T10:45:00 .S. ZEP 2010 1 7 8 35 0 2010-01-07T08:35:00Z 2010.0174181887367 781-99 1884.37 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291566 H6 2010-03-10T16:22:00 ... ZEP 2010 1 7 8 35 0 2010-01-07T08:35:00Z 2010.0174181887367 782-99 1884.26 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291567 H6 2010-03-10T16:37:00 ... ZEP 2010 1 14 8 40 0 2010-01-14T08:40:00Z 2010.036605783866 803-91 1874.56 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291574 H6 2010-03-11T14:04:00 ... ZEP 2010 1 14 8 40 0 2010-01-14T08:40:00Z 2010.036605783866 804-91 1875.6 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291575 H6 2010-03-11T14:20:00 ... ZEP 2010 1 21 9 20 0 2010-01-21T09:20:00Z 2010.0558599695587 1583-99 1888.05 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291576 H6 2010-03-11T14:35:00 ... ZEP 2010 1 21 9 20 0 2010-01-21T09:20:00Z 2010.0558599695587 1584-99 1887.51 1.31 78.9067 11.8883 479.0 474.0 5.0 P 291577 H6 2010-03-11T14:50:00 ... ZEP 2010 1 28 8 30 0 2010-01-28T08:30:00Z 2010.0749429223745 2189-99 1913.01 0.91 78.9067 11.8883 479.0 474.0 5.0 P 320179 H11 2011-07-11T12:03:00 ... ZEP 2010 1 28 8 30 0 2010-01-28T08:30:00Z 2010.0749429223745 2190-99 1914.21 0.91 78.9067 11.8883 479.0 474.0 5.0 P 320180 H11 2011-07-11T12:18:00 ... ZEP 2010 2 4 8 25 0 2010-02-04T08:25:00Z 2010.0941114916286 4025-99 1929.29 0.91 78.9067 11.8883 479.0 474.0 5.0 P 320181 H11 2011-07-08T14:18:00 ... ZEP 2010 2 4 8 25 0 2010-02-04T08:25:00Z 2010.0941114916286 4026-99 1929.99 0.91 78.9067 11.8883 479.0 474.0 5.0 P 320182 H11 2011-07-08T14:33:00 ... ZEP 2010 2 11 8 40 0 2010-02-11T08:40:00Z 2010.1133181126331 4441-99 1915.36 1.31 78.9067 11.8883 479.0 474.0 5.0 P 293445 H6 2010-04-09T14:23:00 ... ZEP 2010 2 11 8 40 0 2010-02-11T08:40:00Z 2010.1133181126331 4442-99 1914.47 1.31 78.9067 11.8883 479.0 474.0 5.0 P 293446 H6 2010-04-09T14:39:00 ... ZEP 2010 2 18 8 30 0 2010-02-18T08:30:00Z 2010.1324771689497 2989-99 1906.69 1.31 78.9067 11.8883 479.0 474.0 5.0 P 293443 H6 2010-04-09T14:54:00 ... ZEP 2010 2 18 8 30 0 2010-02-18T08:30:00Z 2010.1324771689497 2990-99 1907.43 1.31 78.9067 11.8883 479.0 474.0 5.0 P 293444 H6 2010-04-09T15:09:00 ... ZEP 2010 2 25 9 9 0 2010-02-25T09:09:00Z 2010.1517294520547 1999-99 1884.0 1.31 78.9067 11.8883 479.0 474.0 5.0 P 293439 H6 2010-04-09T13:53:00 ... ZEP 2010 2 25 9 9 0 2010-02-25T09:09:00Z 2010.1517294520547 2000-99 1883.99 1.31 78.9067 11.8883 479.0 474.0 5.0 P 293440 H6 2010-04-09T14:08:00 ... ZEP 2010 3 4 10 32 0 2010-03-04T10:32:00Z 2010.1710654490107 345-99 1879.94 1.31 78.9067 11.8883 479.0 474.0 5.0 P 293441 H6 2010-04-09T13:22:00 ... ZEP 2010 3 4 10 32 0 2010-03-04T10:32:00Z 2010.1710654490107 346-99 1881.47 1.31 78.9067 11.8883 479.0 474.0 5.0 P 293442 H6 2010-04-09T13:38:00 ... ZEP 2010 3 11 10 13 0 2010-03-11T10:13:00Z 2010.1902073820395 291-99 1923.91 1.31 78.9067 11.8883 479.0 474.0 5.0 P 293835 H6 2010-04-15T12:53:00 ... ZEP 2010 3 11 10 13 0 2010-03-11T10:13:00Z 2010.1902073820395 292-99 1924.56 1.31 78.9067 11.8883 479.0 474.0 5.0 P 293836 H6 2010-04-15T13:09:00 ... ZEP 2010 3 18 9 50 0 2010-03-18T09:50:00Z 2010.2093417047183 4137-99 1921.24 1.31 78.9067 11.8883 479.0 474.0 5.0 P 293833 H6 2010-04-15T12:23:00 ... ZEP 2010 3 18 9 50 0 2010-03-18T09:50:00Z 2010.2093417047183 4138-99 1924.13 1.31 78.9067 11.8883 479.0 474.0 5.0 P 293834 H6 2010-04-15T12:38:00 ... ZEP 2010 3 25 9 26 0 2010-03-25T09:26:00Z 2010.2284741248097 1549-99 1894.83 0.91 78.9067 11.8883 479.0 474.0 5.0 P 295189 H11 2010-04-23T13:47:00 ... ZEP 2010 3 25 9 26 0 2010-03-25T09:26:00Z 2010.2284741248097 1550-99 1891.81 0.91 78.9067 11.8883 479.0 474.0 5.0 P 295190 H11 2010-04-23T14:01:00 ... ZEP 2010 4 1 7 7 0 2010-04-01T07:07:00Z 2010.2473877473365 427-99 1922.98 0.91 78.9067 11.8883 479.0 474.0 5.0 P 295187 H11 2010-04-23T14:16:00 ... ZEP 2010 4 1 7 7 0 2010-04-01T07:07:00Z 2010.2473877473365 428-99 1921.95 0.91 78.9067 11.8883 479.0 474.0 5.0 P 295188 H11 2010-04-23T14:31:00 ... ZEP 2010 4 8 8 40 0 2010-04-08T08:40:00Z 2010.2667427701674 791-91 1896.5 1.31 78.9067 11.8883 479.0 474.0 5.0 P 297191 H6 2010-05-28T16:10:00 ... ZEP 2010 4 8 8 40 0 2010-04-08T08:40:00Z 2010.2667427701674 792-91 1898.81 1.31 78.9067 11.8883 479.0 474.0 5.0 P 297192 H6 2010-05-28T16:26:00 ... ZEP 2010 4 15 7 38 0 2010-04-15T07:38:00Z 2010.285802891933 733-91 1884.02 1.31 78.9067 11.8883 479.0 474.0 5.0 P 297193 H6 2010-05-28T15:40:00 ... ZEP 2010 4 15 7 38 0 2010-04-15T07:38:00Z 2010.285802891933 734-91 1883.83 1.31 78.9067 11.8883 479.0 474.0 5.0 P 297194 H6 2010-05-28T15:55:00 ... ZEP 2010 4 22 7 35 0 2010-04-22T07:35:00Z 2010.3049752663624 2095-99 1890.06 1.31 78.9067 11.8883 479.0 474.0 5.0 P 297189 H6 2010-05-28T14:39:00 ... ZEP 2010 4 22 7 35 0 2010-04-22T07:35:00Z 2010.3049752663624 2096-99 1891.9 1.31 78.9067 11.8883 479.0 474.0 5.0 P 297190 H6 2010-05-28T14:54:00 ... ZEP 2010 4 29 8 23 0 2010-04-29T08:23:00Z 2010.324244672755 3169-99 1884.76 1.31 78.9067 11.8883 479.0 474.0 5.0 P 297187 H6 2010-05-28T15:09:00 ... ZEP 2010 4 29 8 23 0 2010-04-29T08:23:00Z 2010.324244672755 3170-99 1884.35 1.31 78.9067 11.8883 479.0 474.0 5.0 P 297188 H6 2010-05-28T15:25:00 ... ZEP 2010 5 6 13 5 0 2010-05-06T13:05:00Z 2010.343959284627 3687-99 1877.31 0.91 78.9067 11.8883 479.0 474.0 5.0 P 298276 H11 2010-06-11T15:26:00 ... ZEP 2010 5 6 13 5 0 2010-05-06T13:05:00Z 2010.343959284627 3688-99 1877.09 0.91 78.9067 11.8883 479.0 474.0 5.0 P 298277 H11 2010-06-11T15:41:00 ... ZEP 2010 5 13 6 58 0 2010-05-13T06:58:00Z 2010.3624391171993 4887-99 1877.69 0.91 78.9067 11.8883 479.0 474.0 5.0 P 298274 H11 2010-06-11T15:55:00 ... ZEP 2010 5 13 6 58 0 2010-05-13T06:58:00Z 2010.3624391171993 4888-99 1878.01 0.91 78.9067 11.8883 479.0 474.0 5.0 P 298275 H11 2010-06-11T16:10:00 ... ZEP 2010 5 20 8 22 0 2010-05-20T08:22:00Z 2010.3817770167427 1481-99 1874.98 0.91 78.9067 11.8883 479.0 474.0 5.0 P 298278 H11 2010-06-11T16:25:00 ... ZEP 2010 5 20 8 22 0 2010-05-20T08:22:00Z 2010.3817770167427 1482-99 1875.2 0.91 78.9067 11.8883 479.0 474.0 5.0 P 298279 H11 2010-06-11T16:39:00 ... ZEP 2010 5 27 7 30 0 2010-05-27T07:30:00Z 2010.4008561643836 2365-99 1872.42 0.91 78.9067 11.8883 479.0 474.0 5.0 P 298280 H11 2010-06-14T14:11:00 ... ZEP 2010 5 27 7 30 0 2010-05-27T07:30:00Z 2010.4008561643836 2366-99 1872.65 0.91 78.9067 11.8883 479.0 474.0 5.0 P 298281 H11 2010-06-14T14:26:00 ... ZEP 2010 6 3 8 15 0 2010-06-03T08:15:00Z 2010.4201198630137 1507-99 1867.64 1.31 78.9067 11.8883 479.0 474.0 5.0 P 300563 H6 2010-07-27T14:17:00 ... ZEP 2010 6 10 7 35 0 2010-06-10T07:35:00Z 2010.4392218417047 1357-99 1866.2 1.31 78.9067 11.8883 479.0 474.0 5.0 P 300561 H6 2010-07-23T13:45:00 ... ZEP 2010 6 10 7 35 0 2010-06-10T07:35:00Z 2010.4392218417047 1358-99 1864.25 1.31 78.9067 11.8883 479.0 474.0 5.0 P 300562 H6 2010-07-23T14:00:00 ... ZEP 2010 6 17 7 45 0 2010-06-17T07:45:00Z 2010.4584189497716 3411-99 1867.21 0.91 78.9067 11.8883 479.0 474.0 5.0 P 300504 H11 2010-07-22T11:24:00 ... ZEP 2010 6 17 7 45 0 2010-06-17T07:45:00Z 2010.4584189497716 3412-99 1866.88 0.91 78.9067 11.8883 479.0 474.0 5.0 P 300505 H11 2010-07-22T11:38:00 ... ZEP 2010 6 24 7 45 0 2010-06-24T07:45:00Z 2010.4775970319636 4419-99 1858.19 0.91 78.9067 11.8883 479.0 474.0 5.0 P 300502 H11 2010-07-22T11:53:00 ... ZEP 2010 6 24 7 45 0 2010-06-24T07:45:00Z 2010.4775970319636 4420-99 1858.8 0.91 78.9067 11.8883 479.0 474.0 5.0 P 300503 H11 2010-07-22T12:08:00 ... ZEP 2010 7 1 14 5 0 2010-07-01T14:05:00Z 2010.4974980974125 6017-66 1856.18 0.91 78.9067 11.8883 479.0 474.0 5.0 P 300520 H11 2010-07-22T13:51:00 ... ZEP 2010 7 1 14 5 0 2010-07-01T14:05:00Z 2010.4974980974125 6018-66 1855.7 0.91 78.9067 11.8883 479.0 474.0 5.0 P 300521 H11 2010-07-22T14:06:00 ... ZEP 2010 7 8 14 45 0 2010-07-08T14:45:00Z 2010.516752283105 1893-99 1851.55 0.91 78.9067 11.8883 479.0 474.0 5.0 P 300518 H11 2010-07-22T14:21:00 ... ZEP 2010 7 8 14 45 0 2010-07-08T14:45:00Z 2010.516752283105 2704-99 1851.87 0.91 78.9067 11.8883 479.0 474.0 5.0 P 300519 H11 2010-07-22T14:35:00 ... ZEP 2010 7 15 8 7 0 2010-07-15T08:07:00Z 2010.5351731354642 783-91 1849.93 0.91 78.9067 11.8883 479.0 474.0 5.0 P 301151 H11 2010-08-02T15:22:00 ... ZEP 2010 7 15 8 7 0 2010-07-15T08:07:00Z 2010.5351731354642 784-91 1849.34 0.91 78.9067 11.8883 479.0 474.0 5.0 P 301152 H11 2010-08-02T15:37:00 ... ZEP 2010 7 22 8 17 0 2010-07-22T08:17:00Z 2010.5543702435311 2689-99 1847.93 0.91 78.9067 11.8883 479.0 474.0 5.0 P 301149 H11 2010-08-03T11:14:00 ... ZEP 2010 7 22 8 17 0 2010-07-22T08:17:00Z 2010.5543702435311 2690-99 1847.83 0.91 78.9067 11.8883 479.0 474.0 5.0 P 301150 H11 2010-08-03T11:29:00 ... ZEP 2010 7 29 7 38 0 2010-07-29T07:38:00Z 2010.5734741248098 81-99 1857.27 0.91 78.9067 11.8883 479.0 474.0 5.0 P 302052 H11 2010-08-18T14:48:00 ... ZEP 2010 7 29 7 38 0 2010-07-29T07:38:00Z 2010.5734741248098 82-99 1857.75 0.91 78.9067 11.8883 479.0 474.0 5.0 P 302053 H11 2010-08-18T15:03:00 ... ZEP 2010 8 5 7 49 0 2010-08-05T07:49:00Z 2010.5926731354643 4639-99 1849.03 0.91 78.9067 11.8883 479.0 474.0 5.0 P 302050 H11 2010-08-18T15:17:00 ... ZEP 2010 8 5 7 49 0 2010-08-05T07:49:00Z 2010.5926731354643 4640-99 1849.05 0.91 78.9067 11.8883 479.0 474.0 5.0 P 302051 H11 2010-08-18T15:32:00 ... ZEP 2010 8 12 8 45 0 2010-08-12T08:45:00Z 2010.611957762557 2809-99 1856.56 1.31 78.9067 11.8883 479.0 474.0 5.0 P 304079 H6 2010-09-22T13:35:00 ... ZEP 2010 8 12 8 45 0 2010-08-12T08:45:00Z 2010.611957762557 2810-99 1854.16 1.31 78.9067 11.8883 479.0 474.0 5.0 P 304080 H6 2010-09-22T13:50:00 ... ZEP 2010 8 19 7 57 0 2010-08-19T07:57:00Z 2010.631044520548 5017-99 1865.23 1.31 78.9067 11.8883 479.0 474.0 5.0 P 304077 H6 2010-09-22T13:04:00 ... ZEP 2010 8 19 7 57 0 2010-08-19T07:57:00Z 2010.631044520548 5018-99 1863.76 1.31 78.9067 11.8883 479.0 474.0 5.0 P 304078 H6 2010-09-22T13:19:00 ... ZEP 2010 8 26 8 15 0 2010-08-26T08:15:00Z 2010.6502568493152 13-99 1878.49 1.31 78.9067 11.8883 479.0 474.0 5.0 P 304754 H6 2010-10-01T13:47:00 ... ZEP 2010 8 26 8 15 0 2010-08-26T08:15:00Z 2010.6502568493152 14-99 1879.66 1.31 78.9067 11.8883 479.0 474.0 5.0 P 304755 H6 2010-10-01T14:02:00 ... ZEP 2010 9 2 8 15 0 2010-09-02T08:15:00Z 2010.6694349315069 4879-99 1870.89 1.31 78.9067 11.8883 479.0 474.0 5.0 P 304757 H6 2010-10-01T14:17:00 ... ZEP 2010 9 2 8 15 0 2010-09-02T08:15:00Z 2010.6694349315069 4880-99 1872.85 1.31 78.9067 11.8883 479.0 474.0 5.0 P 304756 H6 2010-10-01T14:33:00 ... ZEP 2010 9 9 9 8 0 2010-09-09T09:08:00Z 2010.688713850837 5135-99 1883.94 1.31 78.9067 11.8883 479.0 474.0 5.0 P 305449 H6 2010-10-13T11:40:00 ... ZEP 2010 9 9 9 8 0 2010-09-09T09:08:00Z 2010.688713850837 5136-99 1883.58 1.31 78.9067 11.8883 479.0 474.0 5.0 P 305450 H6 2010-10-13T11:55:00 ... ZEP 2010 9 17 7 21 0 2010-09-17T07:21:00Z 2010.7104280821918 743-91 1884.2 1.31 78.9067 11.8883 479.0 474.0 5.0 P 305448 H6 2010-10-13T12:25:00 ... ZEP 2010 9 17 7 21 0 2010-09-17T07:21:00Z 2010.7104280821918 793-91 1884.06 1.31 78.9067 11.8883 479.0 474.0 5.0 P 305447 H6 2010-10-13T12:10:00 ... ZEP 2010 9 23 7 10 0 2010-09-23T07:10:00Z 2010.7268455098936 2097-99 1906.5 1.31 78.9067 11.8883 479.0 474.0 5.0 P 306395 H6 2010-10-27T14:24:00 ... ZEP 2010 9 23 7 10 0 2010-09-23T07:10:00Z 2010.7268455098936 2098-99 1907.93 1.31 78.9067 11.8883 479.0 474.0 5.0 P 306396 H6 2010-10-27T14:39:00 ... ZEP 2010 9 30 8 16 0 2010-09-30T08:16:00Z 2010.7461491628615 525-99 1981.77 1.31 78.9067 11.8883 479.0 474.0 5.0 P 306393 H6 2010-10-27T13:53:00 C.. ZEP 2010 9 30 8 16 0 2010-09-30T08:16:00Z 2010.7461491628615 526-99 1980.96 1.31 78.9067 11.8883 479.0 474.0 5.0 P 306394 H6 2010-10-27T14:08:00 C.. ZEP 2010 10 7 7 57 0 2010-10-07T07:57:00Z 2010.7652910958905 5191-99 2036.9 0.91 78.9067 11.8883 479.0 474.0 5.0 P 306383 H11 2010-10-27T14:57:00 C.. ZEP 2010 10 7 7 57 0 2010-10-07T07:57:00Z 2010.7652910958905 5192-99 2034.5 0.91 78.9067 11.8883 479.0 474.0 5.0 P 306384 H11 2010-10-27T15:12:00 C.. ZEP 2010 10 14 8 22 0 2010-10-14T08:22:00Z 2010.7845167427702 5077-99 2016.87 0.91 78.9067 11.8883 479.0 474.0 5.0 P 306385 H11 2010-10-27T15:27:00 C.. ZEP 2010 10 14 8 22 0 2010-10-14T08:22:00Z 2010.7845167427702 5078-99 2005.7 0.91 78.9067 11.8883 479.0 474.0 5.0 P 306386 H11 2010-10-27T15:41:00 C.. ZEP 2010 10 22 8 28 0 2010-10-22T08:28:00Z 2010.8064459665145 1955-99 2050.1 0.91 78.9067 11.8883 479.0 474.0 5.0 P 308031 H11 2010-11-22T11:49:00 C.. ZEP 2010 10 22 8 28 0 2010-10-22T08:28:00Z 2010.8064459665145 1956-99 2043.44 0.91 78.9067 11.8883 479.0 474.0 5.0 P 308032 H11 2010-11-22T12:04:00 C.. ZEP 2010 10 28 8 26 0 2010-10-28T08:26:00Z 2010.8228805175038 4297-99 1998.49 0.91 78.9067 11.8883 479.0 474.0 5.0 P 308029 H11 2010-11-22T11:20:00 C.. ZEP 2010 10 28 8 26 0 2010-10-28T08:26:00Z 2010.8228805175038 4298-99 2003.76 0.91 78.9067 11.8883 479.0 474.0 5.0 P 308030 H11 2010-11-22T11:35:00 C.. ZEP 2010 11 25 10 13 0 2010-11-25T10:13:00Z 2010.8997964231355 4871-99 1887.76 1.31 78.9067 11.8883 479.0 474.0 5.0 P 310106 H6 2010-12-30T13:03:00 ... ZEP 2010 11 25 10 13 0 2010-11-25T10:13:00Z 2010.8997964231355 4872-99 1888.73 1.31 78.9067 11.8883 479.0 474.0 5.0 P 310107 H6 2010-12-30T13:20:00 ... ZEP 2010 12 2 11 54 0 2010-12-02T11:54:00Z 2010.9191666666666 2627-99 1880.53 0.91 78.9067 11.8883 479.0 474.0 5.0 P 310108 H11 2011-01-03T11:36:00 ... ZEP 2010 12 2 11 54 0 2010-12-02T11:54:00Z 2010.9191666666666 2628-99 1878.88 0.91 78.9067 11.8883 479.0 474.0 5.0 P 310109 H11 2011-01-03T11:51:00 ... ZEP 2010 12 10 10 15 0 2010-12-10T10:15:00Z 2010.9408961187214 1055-99 1896.74 1.31 78.9067 11.8883 479.0 474.0 5.0 P 310275 H6 2011-01-04T11:59:00 ... ZEP 2010 12 10 10 15 0 2010-12-10T10:15:00Z 2010.9408961187214 1056-99 1898.32 1.31 78.9067 11.8883 479.0 474.0 5.0 P 310276 H6 2011-01-04T12:15:00 ... ZEP 2010 12 16 13 27 0 2010-12-16T13:27:00Z 2010.9576997716895 2715-99 1879.36 1.31 78.9067 11.8883 479.0 474.0 5.0 P 310273 H6 2011-01-04T11:26:00 ... ZEP 2010 12 16 13 27 0 2010-12-16T13:27:00Z 2010.9576997716895 2716-99 1877.64 1.31 78.9067 11.8883 479.0 474.0 5.0 P 310274 H6 2011-01-04T11:43:00 ... ZEP 2010 12 23 9 25 0 2010-12-23T09:25:00Z 2010.9764174277016 295-99 1875.5 0.91 78.9067 11.8883 479.0 474.0 5.0 P 311038 H11 2011-01-18T12:15:00 ... ZEP 2010 12 23 9 25 0 2010-12-23T09:25:00Z 2010.9764174277016 296-99 1876.72 0.91 78.9067 11.8883 479.0 474.0 5.0 P 311039 H11 2011-01-18T12:29:00 ... ZEP 2010 12 30 10 55 0 2010-12-30T10:55:00Z 2010.9957667427702 3013-99 1882.15 0.91 78.9067 11.8883 479.0 474.0 5.0 P 311040 H11 2011-01-18T12:44:00 ... ZEP 2010 12 30 10 55 0 2010-12-30T10:55:00Z 2010.9957667427702 3014-99 1881.64 0.91 78.9067 11.8883 479.0 474.0 5.0 P 311041 H11 2011-01-18T12:59:00 ... ZEP 2011 1 6 10 10 0 2011-01-06T10:10:00Z 2011.0148592085236 811-91 1904.49 0.91 78.9067 11.8883 479.0 474.0 5.0 P 312708 H11 2011-02-18T14:38:00 ... ZEP 2011 1 6 10 10 0 2011-01-06T10:10:00Z 2011.0148592085236 812-91 1903.93 0.91 78.9067 11.8883 479.0 474.0 5.0 P 312709 H11 2011-02-18T14:53:00 ... ZEP 2011 1 13 9 45 0 2011-01-13T09:45:00Z 2011.0339897260274 749-99 1890.3 1.31 78.9067 11.8883 479.0 474.0 5.0 P 312710 H6 2011-02-18T14:38:00 ... ZEP 2011 1 13 9 45 0 2011-01-13T09:45:00Z 2011.0339897260274 750-99 1891.49 1.31 78.9067 11.8883 479.0 474.0 5.0 P 312711 H6 2011-02-18T14:54:00 ... ZEP 2011 1 21 10 4 0 2011-01-21T10:04:00Z 2011.0559436834094 3927-99 1896.66 1.31 78.9067 11.8883 479.0 474.0 5.0 P 312533 H6 2011-02-16T11:20:00 ... ZEP 2011 1 21 10 4 0 2011-01-21T10:04:00Z 2011.0559436834094 3928-99 1897.11 1.31 78.9067 11.8883 479.0 474.0 5.0 P 312534 H6 2011-02-16T11:36:00 ... ZEP 2011 1 27 8 35 0 2011-01-27T08:35:00Z 2011.0722127092847 811-99 1891.2 1.31 78.9067 11.8883 479.0 474.0 5.0 P 312535 H6 2011-02-16T11:52:00 ... ZEP 2011 1 27 8 35 0 2011-01-27T08:35:00Z 2011.0722127092847 812-99 1890.91 1.31 78.9067 11.8883 479.0 474.0 5.0 P 312536 H6 2011-02-16T12:08:00 ... ZEP 2011 2 3 8 36 0 2011-02-03T08:36:00Z 2011.0913926940639 5137-99 1898.16 1.31 78.9067 11.8883 479.0 474.0 5.0 P 314136 H6 2011-03-15T14:07:00 ... ZEP 2011 2 3 8 36 0 2011-02-03T08:36:00Z 2011.0913926940639 5138-99 1898.83 1.31 78.9067 11.8883 479.0 474.0 5.0 P 314137 H6 2011-03-15T14:23:00 ... ZEP 2011 2 10 14 0 0 2011-02-10T14:00:00Z 2011.1111872146118 5103-99 1888.12 1.31 78.9067 11.8883 479.0 474.0 5.0 P 314134 H6 2011-03-15T14:39:00 ... ZEP 2011 2 10 14 0 0 2011-02-10T14:00:00Z 2011.1111872146118 5104-99 1888.93 1.31 78.9067 11.8883 479.0 474.0 5.0 P 314135 H6 2011-03-15T14:56:00 ... ZEP 2011 2 17 9 30 0 2011-02-17T09:30:00Z 2011.1298515981734 1433-99 1892.32 1.31 78.9067 11.8883 479.0 474.0 5.0 P 314152 H6 2011-03-16T11:23:00 ... ZEP 2011 2 17 9 30 0 2011-02-17T09:30:00Z 2011.1298515981734 1434-99 1891.03 1.31 78.9067 11.8883 479.0 474.0 5.0 P 314153 H6 2011-03-16T11:39:00 ... ZEP 2011 2 24 9 5 0 2011-02-24T09:05:00Z 2011.1489821156774 4809-99 1890.74 1.31 78.9067 11.8883 479.0 474.0 5.0 P 314150 H6 2011-03-16T10:50:00 ... ZEP 2011 2 24 9 5 0 2011-02-24T09:05:00Z 2011.1489821156774 4810-99 1890.11 1.31 78.9067 11.8883 479.0 474.0 5.0 P 314151 H6 2011-03-16T11:06:00 ... ZEP 2011 3 3 14 42 0 2011-03-03T14:42:00Z 2011.168801369863 3583-99 1899.68 1.31 78.9067 11.8883 479.0 474.0 5.0 P 315304 H6 2011-04-04T14:14:00 ... ZEP 2011 3 3 14 42 0 2011-03-03T14:42:00Z 2011.168801369863 3584-99 1900.16 1.31 78.9067 11.8883 479.0 474.0 5.0 P 315305 H6 2011-04-04T14:30:00 ... ZEP 2011 3 10 15 50 0 2011-03-10T15:50:00Z 2011.188108828006 971-99 1898.26 1.31 78.9067 11.8883 479.0 474.0 5.0 P 315302 H6 2011-04-04T13:09:00 ... ZEP 2011 3 10 15 50 0 2011-03-10T15:50:00Z 2011.188108828006 972-99 1899.29 1.31 78.9067 11.8883 479.0 474.0 5.0 P 315303 H6 2011-04-04T13:25:00 ... ZEP 2011 3 25 9 12 0 2011-03-25T09:12:00Z 2011.2284474885844 739-91 1894.46 1.31 78.9067 11.8883 479.0 474.0 5.0 P 317873 H6 2011-05-19T13:55:00 ... ZEP 2011 3 25 9 12 0 2011-03-25T09:12:00Z 2011.2284474885844 740-91 1893.29 1.31 78.9067 11.8883 479.0 474.0 5.0 P 317874 H6 2011-05-19T14:11:00 ... ZEP 2011 3 31 7 40 0 2011-03-31T07:40:00Z 2011.2447108066972 1257-99 1892.83 0.91 78.9067 11.8883 479.0 474.0 5.0 P 317138 H11 2011-05-04T11:48:00 ... ZEP 2011 3 31 7 40 0 2011-03-31T07:40:00Z 2011.2447108066972 1258-99 1893.01 0.91 78.9067 11.8883 479.0 474.0 5.0 P 317139 H11 2011-05-04T12:03:00 ... ZEP 2011 3 31 7 52 0 2011-03-31T07:52:00Z 2011.2447336377472 801-91 1893.21 1.31 78.9067 11.8883 479.0 474.0 5.0 P 317871 H6 2011-05-19T13:22:00 ... ZEP 2011 3 31 7 52 0 2011-03-31T07:52:00Z 2011.2447336377472 802-91 1892.99 1.31 78.9067 11.8883 479.0 474.0 5.0 P 317872 H6 2011-05-19T13:39:00 ... ZEP 2011 4 8 9 28 0 2011-04-08T09:28:00Z 2011.2668340943683 779-99 1880.06 0.91 78.9067 11.8883 479.0 474.0 5.0 P 317136 H11 2011-05-04T12:19:00 ... ZEP 2011 4 8 9 28 0 2011-04-08T09:28:00Z 2011.2668340943683 780-99 1880.09 0.91 78.9067 11.8883 479.0 474.0 5.0 P 317137 H11 2011-05-04T12:34:00 ... ZEP 2011 4 14 8 19 0 2011-04-14T08:19:00Z 2011.283141171994 2713-99 1892.4 1.31 78.9067 11.8883 479.0 474.0 5.0 P 317867 H6 2011-05-19T17:10:00 ... ZEP 2011 4 14 8 19 0 2011-04-14T08:19:00Z 2011.283141171994 2714-99 1891.1 1.31 78.9067 11.8883 479.0 474.0 5.0 P 317868 H6 2011-05-19T17:26:00 ... ZEP 2011 4 22 10 41 0 2011-04-22T10:41:00Z 2011.3053291476408 3981-99 1887.25 1.31 78.9067 11.8883 479.0 474.0 5.0 P 317865 H6 2011-05-19T16:38:00 ... ZEP 2011 4 22 10 41 0 2011-04-22T10:41:00Z 2011.3053291476408 3982-99 1887.73 1.31 78.9067 11.8883 479.0 474.0 5.0 P 317866 H6 2011-05-19T16:54:00 ... ZEP 2011 4 28 9 5 0 2011-04-28T09:05:00Z 2011.3215848554034 4567-99 1885.63 0.91 78.9067 11.8883 479.0 474.0 5.0 P 318411 H11 2011-06-02T10:56:00 ... ZEP 2011 4 28 9 5 0 2011-04-28T09:05:00Z 2011.3215848554034 4568-99 1883.69 0.91 78.9067 11.8883 479.0 474.0 5.0 P 318412 H11 2011-06-02T11:11:00 ... ZEP 2011 5 6 14 44 0 2011-05-06T14:44:00Z 2011.3441476407916 3823-99 1879.89 0.91 78.9067 11.8883 479.0 474.0 5.0 P 318413 H11 2011-06-02T11:57:00 ... ZEP 2011 5 12 12 40 0 2011-05-12T12:40:00Z 2011.3603500761035 803-91 1883.43 0.91 78.9067 11.8883 479.0 474.0 5.0 P 319060 H11 2011-06-10T14:10:00 ... ZEP 2011 5 12 12 40 0 2011-05-12T12:40:00Z 2011.3603500761035 804-91 1883.63 0.91 78.9067 11.8883 479.0 474.0 5.0 P 319061 H11 2011-06-10T14:25:00 ... ZEP 2011 5 20 8 20 0 2011-05-20T08:20:00Z 2011.3817732115676 4989-99 1882.88 0.91 78.9067 11.8883 479.0 474.0 5.0 P 319058 H11 2011-06-10T14:41:00 ... ZEP 2011 5 20 8 20 0 2011-05-20T08:20:00Z 2011.3817732115676 4990-99 1882.71 0.91 78.9067 11.8883 479.0 474.0 5.0 P 319059 H11 2011-06-10T14:56:00 ... ZEP 2011 5 27 9 40 0 2011-05-27T09:40:00Z 2011.401103500761 5365-99 1874.44 1.31 78.9067 11.8883 479.0 474.0 5.0 P 319421 H6 2011-06-20T13:15:00 ... ZEP 2011 5 27 9 40 0 2011-05-27T09:40:00Z 2011.401103500761 5366-99 1873.28 1.31 78.9067 11.8883 479.0 474.0 5.0 P 319422 H6 2011-06-20T13:31:00 ... ZEP 2011 6 2 10 40 0 2011-06-02T10:40:00Z 2011.4176560121766 5363-99 1877.87 1.31 78.9067 11.8883 479.0 474.0 5.0 P 319423 H6 2011-06-20T12:42:00 ... ZEP 2011 6 2 10 40 0 2011-06-02T10:40:00Z 2011.4176560121766 5364-99 1878.07 1.31 78.9067 11.8883 479.0 474.0 5.0 P 319424 H6 2011-06-20T12:58:00 ... ZEP 2011 6 9 9 29 0 2011-06-09T09:29:00Z 2011.4366990106546 2635-99 1869.25 0.91 78.9067 11.8883 479.0 474.0 5.0 P 320224 H11 2011-07-12T12:34:00 ... ZEP 2011 6 9 9 29 0 2011-06-09T09:29:00Z 2011.4366990106546 2636-99 1868.91 0.91 78.9067 11.8883 479.0 474.0 5.0 P 320225 H11 2011-07-12T12:49:00 ... ZEP 2011 6 16 8 45 0 2011-06-16T08:45:00Z 2011.4557933789954 4125-99 1858.97 0.91 78.9067 11.8883 479.0 474.0 5.0 P 320222 H11 2011-07-12T13:05:00 ... ZEP 2011 6 16 8 45 0 2011-06-16T08:45:00Z 2011.4557933789954 4126-99 1859.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 320223 H11 2011-07-12T13:20:00 ... ZEP 2011 6 23 8 59 0 2011-06-23T08:59:00Z 2011.4749980974125 405-99 1859.5 0.91 78.9067 11.8883 479.0 474.0 5.0 P 320511 H11 2011-07-19T14:27:00 ... ZEP 2011 6 23 8 59 0 2011-06-23T08:59:00Z 2011.4749980974125 406-99 1860.16 0.91 78.9067 11.8883 479.0 474.0 5.0 P 320512 H11 2011-07-19T14:42:00 ... ZEP 2011 6 30 8 5 0 2011-06-30T08:05:00Z 2011.4940734398783 2067-99 1858.22 0.91 78.9067 11.8883 479.0 474.0 5.0 P 320509 H11 2011-07-19T13:56:00 ... ZEP 2011 6 30 8 5 0 2011-06-30T08:05:00Z 2011.4940734398783 2068-99 1858.65 0.91 78.9067 11.8883 479.0 474.0 5.0 P 320510 H11 2011-07-19T14:11:00 ... ZEP 2011 7 7 8 21 0 2011-07-07T08:21:00Z 2011.5132819634703 4783-99 1859.06 0.91 78.9067 11.8883 479.0 474.0 5.0 P 321398 H11 2011-07-28T17:13:00 ... ZEP 2011 7 7 8 21 0 2011-07-07T08:21:00Z 2011.5132819634703 4784-99 1859.52 0.91 78.9067 11.8883 479.0 474.0 5.0 P 321399 H11 2011-07-28T17:28:00 ... ZEP 2011 7 14 7 47 0 2011-07-14T07:47:00Z 2011.5323953576865 3641-99 1862.61 0.91 78.9067 11.8883 479.0 474.0 5.0 P 321396 H11 2011-07-28T16:42:00 ... ZEP 2011 7 14 7 47 0 2011-07-14T07:47:00Z 2011.5323953576865 3642-99 1861.82 0.91 78.9067 11.8883 479.0 474.0 5.0 P 321397 H11 2011-07-28T16:58:00 ... ZEP 2011 7 22 7 5 0 2011-07-22T07:05:00Z 2011.5542332572297 867-99 1856.11 1.31 78.9067 11.8883 479.0 474.0 5.0 P 323105 H6 2011-09-06T15:15:00 ... ZEP 2011 7 22 7 5 0 2011-07-22T07:05:00Z 2011.5542332572297 868-99 1855.41 1.31 78.9067 11.8883 479.0 474.0 5.0 P 323106 H6 2011-09-06T15:31:00 ... ZEP 2011 7 28 7 24 0 2011-07-28T07:24:00Z 2011.570707762557 79-99 1866.19 1.31 78.9067 11.8883 479.0 474.0 5.0 P 323103 H6 2011-09-06T14:42:00 ... ZEP 2011 7 28 7 24 0 2011-07-28T07:24:00Z 2011.570707762557 80-99 1867.02 1.31 78.9067 11.8883 479.0 474.0 5.0 P 323104 H6 2011-09-06T14:59:00 ... ZEP 2011 8 4 12 30 0 2011-08-04T12:30:00Z 2011.5904680365297 2735-99 1849.34 1.31 78.9067 11.8883 479.0 474.0 5.0 P 323067 H6 2011-09-06T16:20:00 ... ZEP 2011 8 4 12 30 0 2011-08-04T12:30:00Z 2011.5904680365297 2736-99 1849.12 1.31 78.9067 11.8883 479.0 474.0 5.0 P 323068 H6 2011-09-06T16:36:00 ... ZEP 2011 8 11 8 7 0 2011-08-11T08:07:00Z 2011.609145738204 4017-99 1869.28 1.31 78.9067 11.8883 479.0 474.0 5.0 P 323069 H6 2011-09-06T15:47:00 ... ZEP 2011 8 11 8 7 0 2011-08-11T08:07:00Z 2011.609145738204 4018-99 1869.5 1.31 78.9067 11.8883 479.0 474.0 5.0 P 323070 H6 2011-09-06T16:04:00 ... ZEP 2011 8 18 9 25 0 2011-08-18T09:25:00Z 2011.6284722222222 1079-99 1871.55 0.91 78.9067 11.8883 479.0 474.0 5.0 P 323422 H11 2011-09-14T12:34:00 ... ZEP 2011 8 18 9 25 0 2011-08-18T09:25:00Z 2011.6284722222222 1080-99 1871.35 0.91 78.9067 11.8883 479.0 474.0 5.0 P 323423 H11 2011-09-14T12:49:00 ... ZEP 2011 8 25 7 44 0 2011-08-25T07:44:00Z 2011.6474581430746 297-99 1873.11 0.91 78.9067 11.8883 479.0 474.0 5.0 P 323420 H11 2011-09-14T13:04:00 ... ZEP 2011 8 25 7 44 0 2011-08-25T07:44:00Z 2011.6474581430746 298-99 1873.14 0.91 78.9067 11.8883 479.0 474.0 5.0 P 323421 H11 2011-09-14T13:20:00 ... ZEP 2011 9 2 9 24 0 2011-09-02T09:24:00Z 2011.6695662100456 5315-99 1858.17 1.31 78.9067 11.8883 479.0 474.0 5.0 P 324622 H6 2011-10-06T12:15:00 ... ZEP 2011 9 2 9 24 0 2011-09-02T09:24:00Z 2011.6695662100456 5348-99 1858.59 1.31 78.9067 11.8883 479.0 474.0 5.0 P 324623 H6 2011-10-06T11:59:00 ... ZEP 2011 9 8 9 58 0 2011-09-08T09:58:00Z 2011.6860692541857 5316-99 1872.5 1.31 78.9067 11.8883 479.0 474.0 5.0 P 324621 H6 2011-10-06T11:43:00 ... ZEP 2011 9 8 9 58 0 2011-09-08T09:58:00Z 2011.6860692541857 5347-99 1871.81 1.31 78.9067 11.8883 479.0 474.0 5.0 P 324620 H6 2011-10-06T11:26:00 ... ZEP 2011 9 16 8 15 0 2011-09-16T08:15:00Z 2011.7077910958903 5301-99 1879.38 0.91 78.9067 11.8883 479.0 474.0 5.0 P 326208 H11 2011-11-08T16:26:00 ... ZEP 2011 9 16 8 15 0 2011-09-16T08:15:00Z 2011.7077910958903 5302-99 1879.24 0.91 78.9067 11.8883 479.0 474.0 5.0 P 326209 H11 2011-11-08T16:41:00 ... ZEP 2011 9 23 7 47 0 2011-09-23T07:47:00Z 2011.7269159056316 1535-99 1896.3 0.91 78.9067 11.8883 479.0 474.0 5.0 P 326210 H11 2011-11-08T15:55:00 ... ZEP 2011 9 23 7 47 0 2011-09-23T07:47:00Z 2011.7269159056316 1536-99 1897.13 0.91 78.9067 11.8883 479.0 474.0 5.0 P 326211 H11 2011-11-08T16:11:00 ... ZEP 2011 9 29 18 30 0 2011-09-29T18:30:00Z 2011.7445776255709 5385-99 1888.53 0.91 78.9067 11.8883 479.0 474.0 5.0 P 326206 H11 2011-11-08T15:25:00 ... ZEP 2011 9 29 18 30 0 2011-09-29T18:30:00Z 2011.7445776255709 5386-99 1888.36 0.91 78.9067 11.8883 479.0 474.0 5.0 P 326207 H11 2011-11-08T15:40:00 ... ZEP 2011 10 6 16 23 0 2011-10-06T16:23:00Z 2011.7635140791476 1863-99 1892.17 0.91 78.9067 11.8883 479.0 474.0 5.0 P 326204 H11 2011-11-08T14:54:00 ... ZEP 2011 10 6 16 23 0 2011-10-06T16:23:00Z 2011.7635140791476 1864-99 1891.41 0.91 78.9067 11.8883 479.0 474.0 5.0 P 326205 H11 2011-11-08T15:10:00 ... ZEP 2011 10 13 8 37 0 2011-10-13T08:37:00Z 2011.7818055555556 5185-99 1899.52 0.91 78.9067 11.8883 479.0 474.0 5.0 P 327399 H11 2011-12-06T12:42:00 ... ZEP 2011 10 13 8 37 0 2011-10-13T08:37:00Z 2011.7818055555556 5186-99 1900.62 0.91 78.9067 11.8883 479.0 474.0 5.0 P 327400 H11 2011-12-06T12:57:00 ... ZEP 2011 10 20 7 55 0 2011-10-20T07:55:00Z 2011.8009037290715 1707-99 1897.63 0.91 78.9067 11.8883 479.0 474.0 5.0 P 327401 H11 2011-12-06T12:11:00 ... ZEP 2011 10 20 7 55 0 2011-10-20T07:55:00Z 2011.8009037290715 1708-99 1897.31 0.91 78.9067 11.8883 479.0 474.0 5.0 P 327402 H11 2011-12-06T12:27:00 ... ZEP 2011 10 27 7 40 0 2011-10-27T07:40:00Z 2011.8200532724504 479-99 1894.83 0.91 78.9067 11.8883 479.0 474.0 5.0 P 327395 H11 2011-12-06T11:41:00 ... ZEP 2011 10 27 7 40 0 2011-10-27T07:40:00Z 2011.8200532724504 480-99 1893.99 0.91 78.9067 11.8883 479.0 474.0 5.0 P 327396 H11 2011-12-06T11:56:00 ... ZEP 2011 11 3 8 30 0 2011-11-03T08:30:00Z 2011.8393264840183 1221-99 1887.59 0.91 78.9067 11.8883 479.0 474.0 5.0 P 327397 H11 2011-12-06T11:10:00 ... ZEP 2011 11 3 8 30 0 2011-11-03T08:30:00Z 2011.8393264840183 1222-99 1886.34 0.91 78.9067 11.8883 479.0 474.0 5.0 P 327398 H11 2011-12-06T11:26:00 ... ZEP 2011 11 10 9 55 0 2011-11-10T09:55:00Z 2011.8586662861492 4825-99 1895.24 0.91 78.9067 11.8883 479.0 474.0 5.0 P 327605 H11 2011-12-13T13:44:00 ... ZEP 2011 11 10 9 55 0 2011-11-10T09:55:00Z 2011.8586662861492 4826-99 1894.23 0.91 78.9067 11.8883 479.0 474.0 5.0 P 327606 H11 2011-12-13T13:59:00 ... ZEP 2011 11 17 9 45 0 2011-11-17T09:45:00Z 2011.8778253424657 165-99 1889.84 0.91 78.9067 11.8883 479.0 474.0 5.0 P 327603 H11 2011-12-13T14:15:00 ... ZEP 2011 11 17 9 45 0 2011-11-17T09:45:00Z 2011.8778253424657 166-99 1888.81 0.91 78.9067 11.8883 479.0 474.0 5.0 P 327604 H11 2011-12-13T14:30:00 ... ZEP 2011 11 24 9 17 0 2011-11-24T09:17:00Z 2011.896950152207 4297-99 1901.05 0.91 78.9067 11.8883 479.0 474.0 5.0 P 328239 H11 2011-12-29T15:21:00 ... ZEP 2011 11 24 9 17 0 2011-11-24T09:17:00Z 2011.896950152207 4298-99 1900.25 0.91 78.9067 11.8883 479.0 474.0 5.0 P 328240 H11 2011-12-29T15:36:00 ... ZEP 2011 12 1 15 26 0 2011-12-01T15:26:00Z 2011.9168302891933 4385-99 1932.81 0.91 78.9067 11.8883 479.0 474.0 5.0 P 328241 H11 2011-12-29T14:50:00 ... ZEP 2011 12 1 15 26 0 2011-12-01T15:26:00Z 2011.9168302891933 4386-99 1934.67 0.91 78.9067 11.8883 479.0 474.0 5.0 P 328242 H11 2011-12-29T15:05:00 ... ZEP 2011 12 8 8 8 0 2011-12-08T08:08:00Z 2011.9351750380517 4503-91 1909.01 0.91 78.9067 11.8883 479.0 474.0 5.0 P 329301 H11 2012-01-13T12:54:00 ... ZEP 2011 12 8 8 8 0 2011-12-08T08:08:00Z 2011.9351750380517 4504-91 1908.36 0.91 78.9067 11.8883 479.0 474.0 5.0 P 329302 H11 2012-01-13T13:09:00 ... ZEP 2011 12 15 9 0 0 2011-12-15T09:00:00Z 2011.9544520547945 4371-91 1901.65 0.91 78.9067 11.8883 479.0 474.0 5.0 P 329299 H11 2012-01-13T12:23:00 ... ZEP 2011 12 15 9 0 0 2011-12-15T09:00:00Z 2011.9544520547945 4372-91 1900.69 0.91 78.9067 11.8883 479.0 474.0 5.0 P 329300 H11 2012-01-13T12:38:00 ... ZEP 2011 12 26 12 25 0 2011-12-26T12:25:00Z 2011.9849790715373 4907-91 1887.99 0.91 78.9067 11.8883 479.0 474.0 5.0 P 329756 H11 2012-01-24T15:14:00 ... ZEP 2011 12 26 12 25 0 2011-12-26T12:25:00Z 2011.9849790715373 4908-91 1887.0 0.91 78.9067 11.8883 479.0 474.0 5.0 P 329757 H11 2012-01-24T15:29:00 ... ZEP 2011 12 28 9 14 0 2011-12-28T09:14:00Z 2011.990095129376 23-98 1909.38 0.91 78.9067 11.8883 479.0 474.0 5.0 P 329754 H11 2012-01-24T14:43:00 ... ZEP 2011 12 28 9 14 0 2011-12-28T09:14:00Z 2011.990095129376 24-98 1909.46 0.91 78.9067 11.8883 479.0 474.0 5.0 P 329755 H11 2012-01-24T14:58:00 ... ZEP 2012 1 19 10 23 0 2012-01-19T10:23:00Z 2012.0503624013359 4925-91 1888.93 0.91 78.9067 11.8883 479.0 474.0 5.0 P 331531 H11 2012-02-28T13:18:00 ... ZEP 2012 1 19 10 23 0 2012-01-19T10:23:00Z 2012.0503624013359 4926-91 1888.7 0.91 78.9067 11.8883 479.0 474.0 5.0 P 331532 H11 2012-02-28T13:33:00 ... ZEP 2012 1 26 8 45 0 2012-01-26T08:45:00Z 2012.069302140255 735-91 1915.83 0.91 78.9067 11.8883 479.0 474.0 5.0 P 331533 H11 2012-02-28T13:48:00 ... ZEP 2012 1 26 8 45 0 2012-01-26T08:45:00Z 2012.069302140255 736-91 1915.82 0.91 78.9067 11.8883 479.0 474.0 5.0 P 331534 H11 2012-02-28T14:04:00 ... ZEP 2012 2 2 9 25 0 2012-02-02T09:25:00Z 2012.0885037188827 781-91 1891.09 0.91 78.9067 11.8883 479.0 474.0 5.0 P 332169 H11 2012-03-09T12:04:00 ... ZEP 2012 2 2 9 25 0 2012-02-02T09:25:00Z 2012.0885037188827 782-91 1890.65 0.91 78.9067 11.8883 479.0 474.0 5.0 P 332170 H11 2012-03-09T12:19:00 ... ZEP 2012 2 9 9 22 0 2012-02-09T09:22:00Z 2012.1076237097755 789-91 1895.28 0.91 78.9067 11.8883 479.0 474.0 5.0 P 332171 H11 2012-03-09T11:33:00 ... ZEP 2012 2 9 9 22 0 2012-02-09T09:22:00Z 2012.1076237097755 790-91 1894.68 0.91 78.9067 11.8883 479.0 474.0 5.0 P 332172 H11 2012-03-09T11:49:00 ... ZEP 2012 2 16 8 30 0 2012-02-16T08:30:00Z 2012.1266507285975 805-91 1905.95 0.91 78.9067 11.8883 479.0 474.0 5.0 P 333617 H11 2012-04-06T14:06:00 ... ZEP 2012 2 16 8 30 0 2012-02-16T08:30:00Z 2012.1266507285975 806-91 1907.18 0.91 78.9067 11.8883 479.0 474.0 5.0 P 333618 H11 2012-04-06T14:21:00 ... ZEP 2012 2 23 9 30 0 2012-02-23T09:30:00Z 2012.1458902550091 815-91 1932.52 0.91 78.9067 11.8883 479.0 474.0 5.0 P 333615 H11 2012-04-09T14:12:00 ... ZEP 2012 2 23 9 30 0 2012-02-23T09:30:00Z 2012.1458902550091 816-91 1930.35 0.91 78.9067 11.8883 479.0 474.0 5.0 P 333616 H11 2012-04-09T14:27:00 ... ZEP 2012 3 1 9 40 0 2012-03-01T09:40:00Z 2012.1650349119611 4007-91 1922.08 1.31 78.9067 11.8883 479.0 474.0 5.0 P 334617 H6 2012-05-10T11:14:00 ... ZEP 2012 3 1 9 40 0 2012-03-01T09:40:00Z 2012.1650349119611 4008-91 1922.18 1.31 78.9067 11.8883 479.0 474.0 5.0 P 334618 H6 2012-05-10T11:30:00 ... ZEP 2012 3 8 9 55 0 2012-03-08T09:55:00Z 2012.1841890558592 785-91 1901.03 1.31 78.9067 11.8883 479.0 474.0 5.0 P 334619 H6 2012-05-10T10:41:00 ... ZEP 2012 3 8 9 55 0 2012-03-08T09:55:00Z 2012.1841890558592 786-91 1904.12 1.31 78.9067 11.8883 479.0 474.0 5.0 P 334620 H6 2012-05-10T10:58:00 ... ZEP 2012 3 15 13 53 0 2012-03-15T13:53:00Z 2012.203766317547 3163-99 1913.34 0.91 78.9067 11.8883 479.0 474.0 5.0 P 333874 H11 2012-04-13T14:48:00 ... ZEP 2012 3 15 13 53 0 2012-03-15T13:53:00Z 2012.203766317547 3164-99 1913.53 0.91 78.9067 11.8883 479.0 474.0 5.0 P 333875 H11 2012-04-13T15:03:00 ... ZEP 2012 3 22 8 42 0 2012-03-22T08:42:00Z 2012.2223019125684 3783-99 1913.94 0.91 78.9067 11.8883 479.0 474.0 5.0 P 333876 H11 2012-04-13T14:17:00 ... ZEP 2012 3 22 8 42 0 2012-03-22T08:42:00Z 2012.2223019125684 3784-99 1914.01 0.91 78.9067 11.8883 479.0 474.0 5.0 P 333877 H11 2012-04-13T14:32:00 ... ZEP 2012 3 29 7 32 0 2012-03-29T07:32:00Z 2012.241294778385 3923-99 1895.98 0.91 78.9067 11.8883 479.0 474.0 5.0 P 335042 H11 2012-05-14T14:35:00 ... ZEP 2012 3 29 7 32 0 2012-03-29T07:32:00Z 2012.241294778385 3924-99 1896.29 0.91 78.9067 11.8883 479.0 474.0 5.0 P 335043 H11 2012-05-14T14:50:00 ... ZEP 2012 4 4 8 19 0 2012-04-04T08:19:00Z 2012.2577773983 5307-99 1905.79 0.91 78.9067 11.8883 479.0 474.0 5.0 P 335044 H11 2012-05-14T14:04:00 ... ZEP 2012 4 4 8 19 0 2012-04-04T08:19:00Z 2012.2577773983 5308-99 1906.35 0.91 78.9067 11.8883 479.0 474.0 5.0 P 335045 H11 2012-05-14T14:19:00 ... ZEP 2012 4 11 7 58 0 2012-04-11T07:58:00Z 2012.276863236187 6023-66 1907.2 0.91 78.9067 11.8883 479.0 474.0 5.0 P 335104 H11 2012-05-14T10:00:00 ... ZEP 2012 4 11 7 58 0 2012-04-11T07:58:00Z 2012.276863236187 6024-66 1906.34 0.91 78.9067 11.8883 479.0 474.0 5.0 P 335105 H11 2012-05-14T10:15:00 ... ZEP 2012 4 19 14 38 0 2012-04-19T14:38:00Z 2012.2994801153613 4881-99 1902.05 0.91 78.9067 11.8883 479.0 474.0 5.0 P 335106 H11 2012-05-14T10:30:00 ... ZEP 2012 4 19 14 38 0 2012-04-19T14:38:00Z 2012.2994801153613 4882-99 1902.05 0.91 78.9067 11.8883 479.0 474.0 5.0 P 335107 H11 2012-05-14T10:46:00 ... ZEP 2012 4 27 8 10 0 2012-04-27T08:10:00Z 2012.320601851852 2855-99 1895.8 1.31 78.9067 11.8883 479.0 474.0 5.0 P 336050 H6 2012-05-30T13:29:00 ... ZEP 2012 4 27 8 10 0 2012-04-27T08:10:00Z 2012.320601851852 2856-99 1896.58 1.31 78.9067 11.8883 479.0 474.0 5.0 P 336051 H6 2012-05-30T13:45:00 ... ZEP 2012 5 3 8 35 0 2012-05-03T08:35:00Z 2012.3370427292045 1521-99 1892.52 1.31 78.9067 11.8883 479.0 474.0 5.0 P 336048 H6 2012-05-30T12:57:00 ... ZEP 2012 5 3 8 35 0 2012-05-03T08:35:00Z 2012.3370427292045 1522-99 1897.53 1.31 78.9067 11.8883 479.0 474.0 5.0 P 336049 H6 2012-05-30T13:13:00 ... ZEP 2012 5 11 14 55 0 2012-05-11T14:55:00Z 2012.359621660595 4253-99 1890.74 0.91 78.9067 11.8883 479.0 474.0 5.0 P 337025 H11 2012-06-19T15:09:00 ... ZEP 2012 5 11 14 55 0 2012-05-11T14:55:00Z 2012.359621660595 4254-99 1889.86 0.91 78.9067 11.8883 479.0 474.0 5.0 P 337026 H11 2012-06-19T15:24:00 ... ZEP 2012 5 18 8 47 0 2012-05-18T08:47:00Z 2012.3780491044322 3467-99 1886.95 0.91 78.9067 11.8883 479.0 474.0 5.0 P 337027 H11 2012-06-19T14:38:00 ... ZEP 2012 5 18 8 47 0 2012-05-18T08:47:00Z 2012.3780491044322 3468-99 1888.03 0.91 78.9067 11.8883 479.0 474.0 5.0 P 337028 H11 2012-06-19T14:53:00 ... ZEP 2012 5 24 8 34 0 2012-05-24T08:34:00Z 2012.3944178809957 217-99 1867.94 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338147 H11 2012-07-23T12:46:00 M.. ZEP 2012 5 24 8 34 0 2012-05-24T08:34:00Z 2012.3944178809957 218-99 1879.61 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338148 H11 2012-07-23T13:01:00 ... ZEP 2012 6 1 8 55 0 2012-06-01T08:55:00Z 2012.416315649666 383-99 1881.59 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338145 H11 2012-07-23T13:16:00 ... ZEP 2012 6 1 8 55 0 2012-06-01T08:55:00Z 2012.416315649666 384-99 1880.68 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338146 H11 2012-07-23T13:31:00 ... ZEP 2012 6 7 9 36 0 2012-06-07T09:36:00Z 2012.4327868852458 643-91 1873.19 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338312 H11 2012-07-20T13:25:00 ... ZEP 2012 6 7 9 36 0 2012-06-07T09:36:00Z 2012.4327868852458 644-91 1873.85 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338313 H11 2012-07-20T13:40:00 ... ZEP 2012 6 14 12 38 0 2012-06-14T12:38:00Z 2012.452257893139 1713-91 1871.02 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338314 H11 2012-07-20T12:54:00 ... ZEP 2012 6 14 12 38 0 2012-06-14T12:38:00Z 2012.452257893139 1714-91 1871.35 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338315 H11 2012-07-20T13:10:00 ... ZEP 2012 6 21 8 35 0 2012-06-21T08:35:00Z 2012.4709225106253 433-99 1865.23 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338622 H11 2012-07-30T14:17:00 ... ZEP 2012 6 21 8 35 0 2012-06-21T08:35:00Z 2012.4709225106253 434-99 1865.21 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338623 H11 2012-07-30T14:32:00 ... ZEP 2012 6 28 8 0 0 2012-06-28T08:00:00Z 2012.4899817850637 4311-99 1861.6 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338624 H11 2012-07-31T08:34:00 ... ZEP 2012 6 28 8 0 0 2012-06-28T08:00:00Z 2012.4899817850637 4312-99 1861.95 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338625 H11 2012-07-31T08:50:00 ... ZEP 2012 7 3 13 58 0 2012-07-03T13:58:00Z 2012.5043222525806 13-99 1861.58 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338669 H11 2012-07-26T15:39:00 ... ZEP 2012 7 3 13 58 0 2012-07-03T13:58:00Z 2012.5043222525806 14-99 1859.29 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338670 H11 2012-07-26T15:55:00 ... ZEP 2012 7 5 8 10 0 2012-07-05T08:10:00Z 2012.5091264420157 5165-99 1859.88 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338667 H11 2012-07-26T16:10:00 ... ZEP 2012 7 5 8 10 0 2012-07-05T08:10:00Z 2012.5091264420157 5166-99 1860.45 0.91 78.9067 11.8883 479.0 474.0 5.0 P 338668 H11 2012-07-26T16:25:00 ... ZEP 2012 7 12 8 20 0 2012-07-12T08:20:00Z 2012.5282710989677 5075-99 1864.82 0.91 78.9067 11.8883 479.0 474.0 5.0 P 339421 H11 2012-08-17T14:08:00 ... ZEP 2012 7 12 8 20 0 2012-07-12T08:20:00Z 2012.5282710989677 5076-99 1864.61 0.91 78.9067 11.8883 479.0 474.0 5.0 P 339422 H11 2012-08-17T14:24:00 ... ZEP 2012 7 19 7 59 0 2012-07-19T07:59:00Z 2012.5473569368548 4649-99 1861.3 0.91 78.9067 11.8883 479.0 474.0 5.0 P 339419 H11 2012-08-20T10:47:00 ... ZEP 2012 7 19 7 59 0 2012-07-19T07:59:00Z 2012.5473569368548 4650-99 1862.75 0.91 78.9067 11.8883 479.0 474.0 5.0 P 339420 H11 2012-08-20T11:02:00 ... ZEP 2012 7 26 7 40 0 2012-07-26T07:40:00Z 2012.5664465695204 195-99 1875.2 0.91 78.9067 11.8883 479.0 474.0 5.0 P 340143 H11 2012-09-05T11:42:00 ... ZEP 2012 7 26 7 40 0 2012-07-26T07:40:00Z 2012.5664465695204 196-99 1875.04 0.91 78.9067 11.8883 479.0 474.0 5.0 P 340144 H11 2012-09-05T11:57:00 ... ZEP 2012 8 2 8 26 0 2012-08-02T08:26:00Z 2012.5856595324833 2285-99 1874.29 0.91 78.9067 11.8883 479.0 474.0 5.0 P 340141 H11 2012-09-05T12:13:00 ... ZEP 2012 8 2 8 26 0 2012-08-02T08:26:00Z 2012.5856595324833 2286-99 1874.44 0.91 78.9067 11.8883 479.0 474.0 5.0 P 340142 H11 2012-09-05T12:28:00 ... ZEP 2012 8 9 8 24 0 2012-08-09T08:24:00Z 2012.604781420765 5301-99 1862.58 0.91 78.9067 11.8883 479.0 474.0 5.0 P 341682 H11 2012-10-03T11:11:00 ... ZEP 2012 8 9 8 24 0 2012-08-09T08:24:00Z 2012.604781420765 5302-99 1862.27 0.91 78.9067 11.8883 479.0 474.0 5.0 P 341683 H11 2012-10-03T11:27:00 ... ZEP 2012 8 16 8 23 0 2012-08-16T08:23:00Z 2012.623905206436 5133-99 1859.46 0.91 78.9067 11.8883 479.0 474.0 5.0 P 341680 H11 2012-10-03T11:42:00 ... ZEP 2012 8 16 8 23 0 2012-08-16T08:23:00Z 2012.623905206436 5134-99 1860.03 0.91 78.9067 11.8883 479.0 474.0 5.0 P 341681 H11 2012-10-03T11:57:00 ... ZEP 2012 8 23 8 57 0 2012-08-23T08:57:00Z 2012.6430954007285 525-99 1897.22 0.91 78.9067 11.8883 479.0 474.0 5.0 P 341239 H11 2012-09-24T13:21:00 ... ZEP 2012 8 23 8 57 0 2012-08-23T08:57:00Z 2012.6430954007285 526-99 1897.57 0.91 78.9067 11.8883 479.0 474.0 5.0 P 341240 H11 2012-09-24T13:37:00 ... ZEP 2012 8 30 8 30 0 2012-08-30T08:30:00Z 2012.6621698542806 1909-99 1889.64 0.91 78.9067 11.8883 479.0 474.0 5.0 P 341241 H11 2012-09-24T12:51:00 ... ZEP 2012 8 30 8 30 0 2012-08-30T08:30:00Z 2012.6621698542806 1910-99 1890.39 0.91 78.9067 11.8883 479.0 474.0 5.0 P 341242 H11 2012-09-24T13:06:00 ... ZEP 2012 9 6 7 56 0 2012-09-06T07:56:00Z 2012.681231026108 3617-99 1882.52 0.91 78.9067 11.8883 479.0 474.0 5.0 P 341961 H11 2012-10-05T13:24:00 ... ZEP 2012 9 6 7 56 0 2012-09-06T07:56:00Z 2012.681231026108 3618-99 1883.7 0.91 78.9067 11.8883 479.0 474.0 5.0 P 341962 H11 2012-10-05T13:39:00 ... ZEP 2012 9 13 8 37 0 2012-09-13T08:37:00Z 2012.700434502125 3691-99 1898.87 0.91 78.9067 11.8883 479.0 474.0 5.0 P 341959 H11 2012-10-05T12:53:00 ... ZEP 2012 9 13 8 37 0 2012-09-13T08:37:00Z 2012.700434502125 3692-99 1897.91 0.91 78.9067 11.8883 479.0 474.0 5.0 P 341960 H11 2012-10-05T13:09:00 ... ZEP 2012 9 20 12 34 56 2012-09-20T12:34:56Z 2012.7200116373203 3841-99 1899.65 0.91 78.9067 11.8883 479.0 474.0 5.0 P 342967 H11 2012-10-30T16:32:00 ... ZEP 2012 9 20 12 34 56 2012-09-20T12:34:56Z 2012.7200116373203 3842-99 1900.24 0.91 78.9067 11.8883 479.0 474.0 5.0 P 342968 H11 2012-10-30T16:47:00 ... ZEP 2012 9 27 8 17 0 2012-09-27T08:17:00Z 2012.7386479204615 4895-99 1887.52 0.91 78.9067 11.8883 479.0 474.0 5.0 P 342969 H11 2012-10-31T08:48:00 ... ZEP 2012 9 27 8 17 0 2012-09-27T08:17:00Z 2012.7386479204615 4896-99 1889.06 0.91 78.9067 11.8883 479.0 474.0 5.0 P 342970 H11 2012-10-31T09:03:00 ... ZEP 2012 10 4 9 50 0 2012-10-04T09:50:00Z 2012.7579500607164 1731-99 1884.71 0.91 78.9067 11.8883 479.0 474.0 5.0 P 343316 H11 2012-11-08T13:45:00 ... ZEP 2012 10 4 9 50 0 2012-10-04T09:50:00Z 2012.7579500607164 1732-99 1885.35 0.91 78.9067 11.8883 479.0 474.0 5.0 P 343317 H11 2012-11-08T14:00:00 ... ZEP 2012 10 11 8 10 0 2012-10-11T08:10:00Z 2012.7768860048573 3261-99 1885.11 0.91 78.9067 11.8883 479.0 474.0 5.0 P 343314 H11 2012-11-08T13:14:00 ... ZEP 2012 10 11 8 10 0 2012-10-11T08:10:00Z 2012.7768860048573 3262-99 1885.7 0.91 78.9067 11.8883 479.0 474.0 5.0 P 343315 H11 2012-11-08T13:29:00 ... ZEP 2012 10 18 7 58 0 2012-10-18T07:58:00Z 2012.795988919247 2839-99 1909.57 0.91 78.9067 11.8883 479.0 474.0 5.0 P 343976 H11 2012-11-21T12:00:00 ... ZEP 2012 10 18 7 58 0 2012-10-18T07:58:00Z 2012.795988919247 2840-99 1910.16 0.91 78.9067 11.8883 479.0 474.0 5.0 P 343977 H11 2012-11-21T12:15:00 ... ZEP 2012 10 25 9 35 0 2012-10-25T09:35:00Z 2012.8152986490588 27-99 1889.56 0.91 78.9067 11.8883 479.0 474.0 5.0 P 343974 H11 2012-11-21T11:30:00 ... ZEP 2012 10 25 9 35 0 2012-10-25T09:35:00Z 2012.8152986490588 28-99 1889.65 0.91 78.9067 11.8883 479.0 474.0 5.0 P 343975 H11 2012-11-21T11:45:00 ... ZEP 2012 11 1 10 55 0 2012-11-01T10:55:00Z 2012.8345761232545 373-99 1900.13 0.91 78.9067 11.8883 479.0 474.0 5.0 P 350504 H11 2013-04-25T12:38:00 ... ZEP 2012 11 1 10 55 0 2012-11-01T10:55:00Z 2012.8345761232545 374-99 1900.38 0.91 78.9067 11.8883 479.0 474.0 5.0 P 350505 H11 2013-04-25T12:54:00 ... ZEP 2012 11 8 9 36 0 2012-11-08T09:36:00Z 2012.8535519125683 17-99 1899.93 0.91 78.9067 11.8883 479.0 474.0 5.0 P 350507 H11 2013-04-25T13:10:00 ... ZEP 2012 11 8 9 36 0 2012-11-08T09:36:00Z 2012.8535519125683 18-99 1900.4 0.91 78.9067 11.8883 479.0 474.0 5.0 P 350506 H11 2013-04-25T13:26:00 ... ZEP 2012 11 16 12 34 56 2012-11-16T12:34:56Z 2012.8757493422384 2087-99 1898.04 0.91 78.9067 11.8883 479.0 474.0 5.0 P 345027 H11 2012-12-20T10:33:00 ... ZEP 2012 11 22 9 47 0 2012-11-22T09:47:00Z 2012.8918241499696 629-99 1908.36 0.91 78.9067 11.8883 479.0 474.0 5.0 P 345028 H11 2012-12-20T10:03:00 ... ZEP 2012 11 22 9 47 0 2012-11-22T09:47:00Z 2012.8918241499696 630-99 1909.26 0.91 78.9067 11.8883 479.0 474.0 5.0 P 345029 H11 2012-12-20T10:18:00 ... ZEP 2012 11 29 10 5 0 2012-11-29T10:05:00Z 2012.9109839860353 5361-99 1895.13 0.91 78.9067 11.8883 479.0 474.0 5.0 P 347629 H11 2013-02-15T09:00:00 ... ZEP 2012 11 29 10 5 0 2012-11-29T10:05:00Z 2012.9109839860353 5362-99 1895.17 0.91 78.9067 11.8883 479.0 474.0 5.0 P 347630 H11 2013-02-15T09:15:00 ... ZEP 2012 12 6 9 20 0 2012-12-06T09:20:00Z 2012.9300242865816 2159-99 1889.38 0.91 78.9067 11.8883 479.0 474.0 5.0 P 347631 H11 2013-02-14T15:35:00 ... ZEP 2012 12 6 9 20 0 2012-12-06T09:20:00Z 2012.9300242865816 2160-99 1888.94 0.91 78.9067 11.8883 479.0 474.0 5.0 P 347632 H11 2013-02-14T15:50:00 ... ZEP 2012 12 13 10 7 0 2012-12-13T10:07:00Z 2012.949239146934 175-99 1949.33 0.91 78.9067 11.8883 479.0 474.0 5.0 P 346520 H11 2013-01-24T10:43:00 .S. ZEP 2012 12 13 10 7 0 2012-12-13T10:07:00Z 2012.949239146934 176-99 1950.05 0.91 78.9067 11.8883 479.0 474.0 5.0 P 346521 H11 2013-01-24T10:58:00 .S. ZEP 2012 12 20 10 20 0 2012-12-20T10:20:00Z 2012.9683894960535 135-99 1894.4 0.91 78.9067 11.8883 479.0 474.0 5.0 P 346518 H11 2013-01-24T11:13:00 ... ZEP 2012 12 20 10 20 0 2012-12-20T10:20:00Z 2012.9683894960535 136-99 1894.92 0.91 78.9067 11.8883 479.0 474.0 5.0 P 346519 H11 2013-01-24T11:28:00 ... ZEP 2012 12 27 8 31 0 2012-12-27T08:31:00Z 2012.9873083636915 1359-99 1913.05 0.91 78.9067 11.8883 479.0 474.0 5.0 P 346835 H11 2013-01-29T15:08:00 ... ZEP 2012 12 27 8 31 0 2012-12-27T08:31:00Z 2012.9873083636915 1360-99 1912.57 0.91 78.9067 11.8883 479.0 474.0 5.0 P 346836 H11 2013-01-29T15:23:00 ... ZEP 2013 1 3 9 15 0 2013-01-03T09:15:00Z 2013.0065353881278 173-99 1914.78 0.91 78.9067 11.8883 479.0 474.0 5.0 P 346833 H11 2013-01-29T15:39:00 ... ZEP 2013 1 3 9 15 0 2013-01-03T09:15:00Z 2013.0065353881278 174-99 1914.78 0.91 78.9067 11.8883 479.0 474.0 5.0 P 346834 H11 2013-01-29T15:54:00 ... ZEP 2013 1 11 10 5 0 2013-01-11T10:05:00Z 2013.028548325723 5109-99 1896.54 0.91 78.9067 11.8883 479.0 474.0 5.0 P 347615 H11 2013-02-15T09:30:00 ... ZEP 2013 1 11 10 5 0 2013-01-11T10:05:00Z 2013.028548325723 5110-99 1896.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 347616 H11 2013-02-15T09:45:00 ... ZEP 2013 1 18 11 52 0 2013-01-18T11:52:00Z 2013.0479299847793 405-99 1930.94 0.91 78.9067 11.8883 479.0 474.0 5.0 P 347617 H11 2013-02-15T10:01:00 ... ZEP 2013 1 18 11 52 0 2013-01-18T11:52:00Z 2013.0479299847793 406-99 1930.03 0.91 78.9067 11.8883 479.0 474.0 5.0 P 347618 H11 2013-02-15T10:16:00 ... ZEP 2013 1 24 10 15 0 2013-01-24T10:15:00Z 2013.0641837899543 2683-99 1933.11 1.31 78.9067 11.8883 479.0 474.0 5.0 P 347789 H6 2013-02-20T14:34:00 ... ZEP 2013 1 24 10 15 0 2013-01-24T10:15:00Z 2013.0641837899543 2684-99 1935.33 1.31 78.9067 11.8883 479.0 474.0 5.0 P 347790 H6 2013-02-20T14:50:00 ... ZEP 2013 1 31 9 17 0 2013-01-31T09:17:00Z 2013.08325152207 1677-99 1953.33 1.31 78.9067 11.8883 479.0 474.0 5.0 P 347791 H6 2013-02-20T15:06:00 .S. ZEP 2013 1 31 9 17 0 2013-01-31T09:17:00Z 2013.08325152207 1678-99 1951.75 1.31 78.9067 11.8883 479.0 474.0 5.0 P 347792 H6 2013-02-20T15:23:00 .S. ZEP 2013 2 7 9 50 0 2013-02-07T09:50:00Z 2013.10249238965 799-91 1946.51 1.31 78.9067 11.8883 479.0 474.0 5.0 P 348217 H6 2013-03-05T13:17:00 .S. ZEP 2013 2 7 9 50 0 2013-02-07T09:50:00Z 2013.10249238965 800-91 1947.41 1.31 78.9067 11.8883 479.0 474.0 5.0 P 348218 H6 2013-03-05T13:33:00 .S. ZEP 2013 2 14 8 54 0 2013-02-14T08:54:00Z 2013.1215639269406 737-91 1919.95 1.31 78.9067 11.8883 479.0 474.0 5.0 P 348801 H6 2013-03-19T10:11:00 ... ZEP 2013 2 14 8 54 0 2013-02-14T08:54:00Z 2013.1215639269406 738-91 1920.52 1.31 78.9067 11.8883 479.0 474.0 5.0 P 348802 H6 2013-03-19T10:27:00 ... ZEP 2013 2 21 8 35 0 2013-02-21T08:35:00Z 2013.1407058599696 795-91 1916.87 1.31 78.9067 11.8883 479.0 474.0 5.0 P 348803 H6 2013-03-19T13:25:00 ... ZEP 2013 2 21 8 35 0 2013-02-21T08:35:00Z 2013.1407058599696 796-91 1918.81 1.31 78.9067 11.8883 479.0 474.0 5.0 P 348804 H6 2013-03-19T13:42:00 ... ZEP 2013 2 28 9 55 0 2013-02-28T09:55:00Z 2013.1600361491628 1429-99 1905.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 349459 H11 2013-04-02T12:08:00 ... ZEP 2013 2 28 9 55 0 2013-02-28T09:55:00Z 2013.1600361491628 1430-99 1905.11 0.91 78.9067 11.8883 479.0 474.0 5.0 P 349460 H11 2013-04-02T12:24:00 ... ZEP 2013 3 7 9 29 0 2013-03-07T09:29:00Z 2013.1791647640791 5051-99 1909.36 0.91 78.9067 11.8883 479.0 474.0 5.0 P 349457 H11 2013-04-02T12:40:00 ... ZEP 2013 3 7 9 29 0 2013-03-07T09:29:00Z 2013.1791647640791 5052-99 1908.56 0.91 78.9067 11.8883 479.0 474.0 5.0 P 349458 H11 2013-04-02T12:56:00 ... ZEP 2013 3 14 14 10 0 2013-03-14T14:10:00Z 2013.1988774733638 2315-99 1901.36 0.91 78.9067 11.8883 479.0 474.0 5.0 P 350213 H11 2013-04-17T10:23:00 ... ZEP 2013 3 14 14 10 0 2013-03-14T14:10:00Z 2013.1988774733638 2316-99 1902.57 0.91 78.9067 11.8883 479.0 474.0 5.0 P 350214 H11 2013-04-17T10:39:00 ... ZEP 2013 3 21 10 17 0 2013-03-21T10:17:00Z 2013.2176122526637 2295-99 1902.88 0.91 78.9067 11.8883 479.0 474.0 5.0 P 350215 H11 2013-04-17T09:51:00 ... ZEP 2013 3 21 10 17 0 2013-03-21T10:17:00Z 2013.2176122526637 2296-99 1901.85 0.91 78.9067 11.8883 479.0 474.0 5.0 P 350216 H11 2013-04-17T10:07:00 ... ZEP 2013 3 28 9 29 0 2013-03-28T09:29:00Z 2013.2366990106545 3555-99 1915.68 0.91 78.9067 11.8883 479.0 474.0 5.0 P 350510 H11 2013-04-25T13:42:00 ... ZEP 2013 3 28 9 29 0 2013-03-28T09:29:00Z 2013.2366990106545 3556-99 1914.85 0.91 78.9067 11.8883 479.0 474.0 5.0 P 350511 H11 2013-04-25T13:58:00 ... ZEP 2013 4 4 8 30 0 2013-04-04T08:30:00Z 2013.2557648401826 1287-99 1905.96 0.91 78.9067 11.8883 479.0 474.0 5.0 P 350508 H11 2013-04-25T14:14:00 ... ZEP 2013 4 4 8 30 0 2013-04-04T08:30:00Z 2013.2557648401826 1288-99 1906.5 0.91 78.9067 11.8883 479.0 474.0 5.0 P 350509 H11 2013-04-25T14:30:00 ... ZEP 2013 4 12 6 50 0 2013-04-12T06:50:00Z 2013.27749238965 3537-99 1909.68 0.91 78.9067 11.8883 479.0 474.0 5.0 P 351260 H11 2013-05-10T14:36:00 ... ZEP 2013 4 12 6 50 0 2013-04-12T06:50:00Z 2013.27749238965 3538-99 1909.09 0.91 78.9067 11.8883 479.0 474.0 5.0 P 351261 H11 2013-05-10T14:52:00 ... ZEP 2013 4 18 8 30 0 2013-04-18T08:30:00Z 2013.2941210045663 1549-99 1902.08 1.31 78.9067 11.8883 479.0 474.0 5.0 P 351262 H6 2013-05-10T14:50:00 ... ZEP 2013 4 18 8 30 0 2013-04-18T08:30:00Z 2013.2941210045663 1550-99 1903.53 1.31 78.9067 11.8883 479.0 474.0 5.0 P 351263 H6 2013-05-10T15:06:00 ... ZEP 2013 4 25 8 45 0 2013-04-25T08:45:00Z 2013.3133276255708 4113-99 1902.65 1.31 78.9067 11.8883 479.0 474.0 5.0 P 351992 H6 2013-05-28T13:10:00 ... ZEP 2013 4 25 8 45 0 2013-04-25T08:45:00Z 2013.3133276255708 4114-99 1903.62 1.31 78.9067 11.8883 479.0 474.0 5.0 P 351993 H6 2013-05-28T13:26:00 ... ZEP 2013 5 2 8 5 0 2013-05-02T08:05:00Z 2013.3324296042617 4651-99 1897.47 1.31 78.9067 11.8883 479.0 474.0 5.0 P 351994 H6 2013-05-28T12:37:00 ... ZEP 2013 5 2 8 5 0 2013-05-02T08:05:00Z 2013.3324296042617 4652-99 1897.06 1.31 78.9067 11.8883 479.0 474.0 5.0 P 351995 H6 2013-05-28T12:53:00 ... ZEP 2013 5 9 9 16 0 2013-05-09T09:16:00Z 2013.3517427701674 2997-99 1898.0 0.91 78.9067 11.8883 479.0 474.0 5.0 P 352601 H11 2013-06-07T10:59:00 ... ZEP 2013 5 9 9 16 0 2013-05-09T09:16:00Z 2013.3517427701674 2998-99 1898.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 352602 H11 2013-06-07T11:15:00 ... ZEP 2013 5 16 8 19 0 2013-05-16T08:19:00Z 2013.3708124048705 4999-99 1897.49 0.91 78.9067 11.8883 479.0 474.0 5.0 P 352599 H11 2013-06-07T11:31:00 ... ZEP 2013 5 16 8 19 0 2013-05-16T08:19:00Z 2013.3708124048705 5000-99 1896.67 0.91 78.9067 11.8883 479.0 474.0 5.0 P 352600 H11 2013-06-07T11:47:00 ... ZEP 2013 5 23 9 15 0 2013-05-23T09:15:00Z 2013.3900970319635 3417-99 1893.17 0.91 78.9067 11.8883 479.0 474.0 5.0 P 353602 H11 2013-06-20T11:42:00 ... ZEP 2013 5 23 9 15 0 2013-05-23T09:15:00Z 2013.3900970319635 3418-99 1893.83 0.91 78.9067 11.8883 479.0 474.0 5.0 P 353601 H11 2013-06-20T11:58:00 ... ZEP 2013 5 27 8 2 0 2013-05-27T08:02:00Z 2013.400917047184 3927-99 1870.59 0.91 78.9067 11.8883 479.0 474.0 5.0 P 354600 H11 2013-07-24T14:30:00 ... ZEP 2013 5 27 8 2 0 2013-05-27T08:02:00Z 2013.400917047184 3928-99 1868.62 0.91 78.9067 11.8883 479.0 474.0 5.0 P 354601 H11 2013-07-24T14:46:00 ... ZEP 2013 5 30 8 51 0 2013-05-30T08:51:00Z 2013.409229452055 5-99 1888.0 0.91 78.9067 11.8883 479.0 474.0 5.0 P 353603 H11 2013-06-20T11:10:00 ... ZEP 2013 5 30 8 51 0 2013-05-30T08:51:00Z 2013.409229452055 6-99 1887.2 0.91 78.9067 11.8883 479.0 474.0 5.0 P 353604 H11 2013-06-20T11:26:00 ... ZEP 2013 6 6 9 35 0 2013-06-06T09:35:00Z 2013.4284912480973 3109-99 1881.64 1.31 78.9067 11.8883 479.0 474.0 5.0 P 353991 H6 2013-07-08T14:17:00 ... ZEP 2013 6 6 9 35 0 2013-06-06T09:35:00Z 2013.4284912480973 3110-99 1881.38 1.31 78.9067 11.8883 479.0 474.0 5.0 P 353992 H6 2013-07-08T14:33:00 ... ZEP 2013 6 13 7 32 0 2013-06-13T07:32:00Z 2013.4474353120243 2597-99 1881.96 1.31 78.9067 11.8883 479.0 474.0 5.0 P 353989 H6 2013-07-08T13:45:00 ... ZEP 2013 6 13 7 32 0 2013-06-13T07:32:00Z 2013.4474353120243 2598-99 1879.9 1.31 78.9067 11.8883 479.0 474.0 5.0 P 353990 H6 2013-07-08T14:01:00 ... ZEP 2013 6 20 8 45 0 2013-06-20T08:45:00Z 2013.466752283105 3577-99 1872.95 0.91 78.9067 11.8883 479.0 474.0 5.0 P 354602 H11 2013-07-24T13:58:00 ... ZEP 2013 6 20 8 45 0 2013-06-20T08:45:00Z 2013.466752283105 3578-99 1874.73 0.91 78.9067 11.8883 479.0 474.0 5.0 P 354603 H11 2013-07-24T14:14:00 ... ZEP 2013 7 4 7 30 0 2013-07-04T07:30:00Z 2013.5049657534246 1617-99 1865.15 0.91 78.9067 11.8883 479.0 474.0 5.0 P 355242 H11 2013-08-06T09:15:00 ... ZEP 2013 7 4 7 30 0 2013-07-04T07:30:00Z 2013.5049657534246 1618-99 1864.79 0.91 78.9067 11.8883 479.0 474.0 5.0 P 355243 H11 2013-08-06T09:31:00 ... ZEP 2013 7 11 8 12 0 2013-07-11T08:12:00Z 2013.5242237442922 297-99 1869.0 0.91 78.9067 11.8883 479.0 474.0 5.0 P 355240 H11 2013-08-06T09:47:00 ... ZEP 2013 7 11 8 12 0 2013-07-11T08:12:00Z 2013.5242237442922 298-99 1868.87 0.91 78.9067 11.8883 479.0 474.0 5.0 P 355241 H11 2013-08-06T10:03:00 ... ZEP 2013 7 18 8 29 0 2013-07-18T08:29:00Z 2013.5434341704718 2761-99 1865.37 0.91 78.9067 11.8883 479.0 474.0 5.0 P 355971 H11 2013-08-16T13:30:00 ... ZEP 2013 7 18 8 29 0 2013-07-18T08:29:00Z 2013.5434341704718 2762-99 1865.35 0.91 78.9067 11.8883 479.0 474.0 5.0 P 355972 H11 2013-08-16T13:46:00 ... ZEP 2013 7 25 8 25 0 2013-07-25T08:25:00Z 2013.5626046423135 1703-99 1866.48 0.91 78.9067 11.8883 479.0 474.0 5.0 P 355970 H11 2013-08-16T14:02:00 ... ZEP 2013 7 25 8 25 0 2013-07-25T08:25:00Z 2013.5626046423135 1704-99 1866.23 0.91 78.9067 11.8883 479.0 474.0 5.0 P 355969 H11 2013-08-16T14:18:00 ... ZEP 2013 8 1 8 35 0 2013-08-01T08:35:00Z 2013.5818017503805 1383-99 1870.87 0.91 78.9067 11.8883 479.0 474.0 5.0 P 356807 H11 2013-09-04T15:25:00 ... ZEP 2013 8 1 8 35 0 2013-08-01T08:35:00Z 2013.5818017503805 1384-99 1871.51 0.91 78.9067 11.8883 479.0 474.0 5.0 P 356808 H11 2013-09-04T15:41:00 ... ZEP 2013 8 8 9 10 0 2013-08-08T09:10:00Z 2013.6010464231354 2905-99 1869.95 0.91 78.9067 11.8883 479.0 474.0 5.0 P 356809 H11 2013-09-04T14:53:00 ... ZEP 2013 8 8 9 10 0 2013-08-08T09:10:00Z 2013.6010464231354 2906-99 1868.96 0.91 78.9067 11.8883 479.0 474.0 5.0 P 356810 H11 2013-09-04T15:09:00 ... ZEP 2013 8 16 8 55 0 2013-08-16T08:55:00Z 2013.622935692542 3305-99 1869.05 1.31 78.9067 11.8883 479.0 474.0 5.0 P 357326 H6 2013-09-30T13:37:00 ... ZEP 2013 8 16 8 55 0 2013-08-16T08:55:00Z 2013.622935692542 3306-99 1869.65 1.31 78.9067 11.8883 479.0 474.0 5.0 P 357327 H6 2013-09-30T13:53:00 ... ZEP 2013 8 22 6 50 0 2013-08-22T06:50:00Z 2013.6391362252664 5218-99 1869.94 0.91 78.9067 11.8883 479.0 474.0 5.0 P 357313 H11 2013-10-28T12:44:00 ... ZEP 2013 8 22 7 50 0 2013-08-22T07:50:00Z 2013.6392503805175 1757-99 1870.63 1.31 78.9067 11.8883 479.0 474.0 5.0 P 357297 H6 2013-09-27T16:03:00 ... ZEP 2013 8 22 7 50 0 2013-08-22T07:50:00Z 2013.6392503805175 1758-99 1868.46 1.31 78.9067 11.8883 479.0 474.0 5.0 P 357298 H6 2013-09-27T16:20:00 ... ZEP 2013 8 29 12 34 56 2013-08-29T12:34:56Z 2013.6589705733131 4941-99 1869.96 1.31 78.9067 11.8883 479.0 474.0 5.0 P 358038 H6 2013-10-24T13:33:00 ... ZEP 2013 8 29 12 34 56 2013-08-29T12:34:56Z 2013.6589705733131 4942-99 1869.32 1.31 78.9067 11.8883 479.0 474.0 5.0 P 358039 H6 2013-10-24T13:49:00 ... ZEP 2013 9 5 8 10 0 2013-09-05T08:10:00Z 2013.6776445966514 1351-99 1870.68 1.31 78.9067 11.8883 479.0 474.0 5.0 P 358036 H6 2013-10-24T11:23:00 ... ZEP 2013 9 5 8 10 0 2013-09-05T08:10:00Z 2013.6776445966514 1352-99 1869.68 1.31 78.9067 11.8883 479.0 474.0 5.0 P 358037 H6 2013-10-24T11:39:00 ... ZEP 2013 9 12 7 40 0 2013-09-12T07:40:00Z 2013.6967656012177 5-99 1874.04 0.91 78.9067 11.8883 479.0 474.0 5.0 P 358710 H11 2013-11-04T16:27:00 ... ZEP 2013 9 12 7 40 0 2013-09-12T07:40:00Z 2013.6967656012177 6-99 1874.16 0.91 78.9067 11.8883 479.0 474.0 5.0 P 358711 H11 2013-11-04T16:43:00 ... ZEP 2013 9 19 8 35 0 2013-09-19T08:35:00Z 2013.716048325723 39-99 1890.91 0.91 78.9067 11.8883 479.0 474.0 5.0 P 358712 H11 2013-11-04T15:55:00 ... ZEP 2013 9 19 8 35 0 2013-09-19T08:35:00Z 2013.716048325723 40-99 1892.57 0.91 78.9067 11.8883 479.0 474.0 5.0 P 358713 H11 2013-11-04T16:11:00 ... ZEP 2013 9 26 7 20 0 2013-09-26T07:20:00Z 2013.7350837138508 3235-99 1883.57 0.91 78.9067 11.8883 479.0 474.0 5.0 P 359186 H11 2013-11-06T12:08:00 ... ZEP 2013 9 26 7 20 0 2013-09-26T07:20:00Z 2013.7350837138508 3236-99 1883.4 0.91 78.9067 11.8883 479.0 474.0 5.0 P 359187 H11 2013-11-06T12:24:00 ... ZEP 2013 10 3 8 26 0 2013-10-03T08:26:00Z 2013.754387366819 715-99 1887.3 0.91 78.9067 11.8883 479.0 474.0 5.0 P 359184 H11 2013-11-06T11:36:00 ... ZEP 2013 10 3 8 26 0 2013-10-03T08:26:00Z 2013.754387366819 716-99 1887.74 0.91 78.9067 11.8883 479.0 474.0 5.0 P 359185 H11 2013-11-06T11:52:00 ... ZEP 2013 10 10 8 0 0 2013-10-10T08:00:00Z 2013.7735159817353 621-99 1889.37 0.91 78.9067 11.8883 479.0 474.0 5.0 P 360523 H11 2013-11-26T11:17:00 ... ZEP 2013 10 17 7 19 0 2013-10-17T07:19:00Z 2013.7926160578386 216-99 1896.69 0.91 78.9067 11.8883 479.0 474.0 5.0 P 360524 H11 2013-11-26T11:33:00 ... ZEP 2013 10 25 9 5 0 2013-10-25T09:05:00Z 2013.8147355403348 935-99 1911.41 0.91 78.9067 11.8883 479.0 474.0 5.0 P 360513 H11 2013-11-26T15:01:00 ... ZEP 2013 10 25 9 5 0 2013-10-25T09:05:00Z 2013.8147355403348 936-99 1911.3 0.91 78.9067 11.8883 479.0 474.0 5.0 P 360514 H11 2013-11-26T15:17:00 ... ZEP 2013 10 31 8 40 0 2013-10-31T08:40:00Z 2013.8311263318112 3711-99 1903.95 0.91 78.9067 11.8883 479.0 474.0 5.0 P 360511 H11 2013-11-26T15:33:00 ... ZEP 2013 10 31 8 40 0 2013-10-31T08:40:00Z 2013.8311263318112 3712-99 1904.04 0.91 78.9067 11.8883 479.0 474.0 5.0 P 360512 H11 2013-11-26T15:49:00 ... ZEP 2013 11 7 8 30 0 2013-11-07T08:30:00Z 2013.8502853881278 1691-99 1905.22 0.91 78.9067 11.8883 479.0 474.0 5.0 P 360663 H11 2013-12-02T14:01:00 ... ZEP 2013 11 7 8 30 0 2013-11-07T08:30:00Z 2013.8502853881278 1692-99 1904.42 0.91 78.9067 11.8883 479.0 474.0 5.0 P 360664 H11 2013-12-02T14:17:00 ... ZEP 2013 11 14 9 15 0 2013-11-14T09:15:00Z 2013.869549086758 2501-99 1900.49 0.91 78.9067 11.8883 479.0 474.0 5.0 P 360665 H11 2013-12-02T11:21:00 ... ZEP 2013 11 14 9 15 0 2013-11-14T09:15:00Z 2013.869549086758 2502-99 1899.62 0.91 78.9067 11.8883 479.0 474.0 5.0 P 360666 H11 2013-12-02T11:37:00 ... ZEP 2013 11 21 9 50 0 2013-11-21T09:50:00Z 2013.888793759513 4109-99 1902.35 0.91 78.9067 11.8883 479.0 474.0 5.0 P 361919 H11 2013-12-30T12:06:00 ... ZEP 2013 11 21 9 50 0 2013-11-21T09:50:00Z 2013.888793759513 4110-99 1902.03 0.91 78.9067 11.8883 479.0 474.0 5.0 P 361920 H11 2013-12-30T12:22:00 ... ZEP 2013 11 28 9 5 0 2013-11-28T09:05:00Z 2013.9078862252663 5413-99 1912.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 361917 H11 2013-12-30T12:38:00 ... ZEP 2013 11 28 9 5 0 2013-11-28T09:05:00Z 2013.9078862252663 5414-99 1912.55 0.91 78.9067 11.8883 479.0 474.0 5.0 P 361918 H11 2013-12-30T12:54:00 ... ZEP 2013 12 6 9 55 0 2013-12-06T09:55:00Z 2013.9298991628616 1703-99 1923.72 0.91 78.9067 11.8883 479.0 474.0 5.0 P 362270 H11 2014-01-03T11:49:00 ... ZEP 2013 12 6 9 55 0 2013-12-06T09:55:00Z 2013.9298991628616 1704-99 1923.35 0.91 78.9067 11.8883 479.0 474.0 5.0 P 362271 H11 2014-01-03T12:05:00 ... ZEP 2013 12 12 9 7 0 2013-12-12T09:07:00Z 2013.9462461948249 1851-99 1935.49 0.91 78.9067 11.8883 479.0 474.0 5.0 P 362268 H11 2014-01-03T11:17:00 ... ZEP 2013 12 12 9 7 0 2013-12-12T09:07:00Z 2013.9462461948249 1852-99 1935.13 0.91 78.9067 11.8883 479.0 474.0 5.0 P 362269 H11 2014-01-03T11:33:00 ... ZEP 2013 12 19 9 0 0 2013-12-19T09:00:00Z 2013.9654109589042 3331-99 1899.34 1.31 78.9067 11.8883 479.0 474.0 5.0 P 362956 H6 2014-02-03T12:34:00 ... ZEP 2013 12 19 9 0 0 2013-12-19T09:00:00Z 2013.9654109589042 3332-99 1898.41 1.31 78.9067 11.8883 479.0 474.0 5.0 P 362957 H6 2014-02-03T12:50:00 ... ZEP 2013 12 26 12 10 0 2013-12-26T12:10:00Z 2013.9849505327245 2631-99 1933.09 0.91 78.9067 11.8883 479.0 474.0 5.0 P 362954 H11 2014-02-03T12:58:00 ... ZEP 2013 12 26 12 10 0 2013-12-26T12:10:00Z 2013.9849505327245 2632-99 1934.72 0.91 78.9067 11.8883 479.0 474.0 5.0 P 362955 H11 2014-02-03T13:14:00 ... ZEP 2014 1 2 11 33 0 2014-01-02T11:33:00Z 2014.004058219178 5207-99 1903.91 1.31 78.9067 11.8883 479.0 474.0 5.0 P 363931 H6 2014-02-14T12:10:00 ... ZEP 2014 1 2 11 33 0 2014-01-02T11:33:00Z 2014.004058219178 5208-99 1904.62 1.31 78.9067 11.8883 479.0 474.0 5.0 P 363932 H6 2014-02-14T12:27:00 ... ZEP 2014 1 9 8 29 0 2014-01-09T08:29:00Z 2014.0228862252663 4505-99 1898.33 0.91 78.9067 11.8883 479.0 474.0 5.0 P 363855 H11 2014-02-18T13:53:00 ... ZEP 2014 1 9 8 29 0 2014-01-09T08:29:00Z 2014.0228862252663 4506-99 1896.54 0.91 78.9067 11.8883 479.0 474.0 5.0 P 363856 H11 2014-02-18T14:09:00 ... ZEP 2014 1 16 9 15 0 2014-01-16T09:15:00Z 2014.042151826484 2047-99 1906.4 0.91 78.9067 11.8883 479.0 474.0 5.0 P 363857 H11 2014-02-18T14:25:00 ... ZEP 2014 1 16 9 15 0 2014-01-16T09:15:00Z 2014.042151826484 2048-99 1905.32 0.91 78.9067 11.8883 479.0 474.0 5.0 P 363858 H11 2014-02-18T14:41:00 ... ZEP 2014 1 23 10 0 0 2014-01-23T10:00:00Z 2014.0614155251142 4035-99 1918.64 1.31 78.9067 11.8883 479.0 474.0 5.0 P 363859 H6 2014-02-18T14:08:00 ... ZEP 2014 1 23 10 0 0 2014-01-23T10:00:00Z 2014.0614155251142 4036-99 1919.61 1.31 78.9067 11.8883 479.0 474.0 5.0 P 363860 H6 2014-02-18T14:24:00 ... ZEP 2014 1 30 8 49 0 2014-01-30T08:49:00Z 2014.0804585235921 2705-99 1909.48 0.91 78.9067 11.8883 479.0 474.0 5.0 P 364517 H11 2014-02-25T16:22:00 ... ZEP 2014 1 30 8 49 0 2014-01-30T08:49:00Z 2014.0804585235921 2706-99 1910.25 0.91 78.9067 11.8883 479.0 474.0 5.0 P 364518 H11 2014-02-25T16:38:00 ... ZEP 2014 2 6 10 8 0 2014-02-06T10:08:00Z 2014.099786910198 6717-66 1929.57 0.91 78.9067 11.8883 479.0 474.0 5.0 P 364519 H11 2014-02-25T15:50:00 ... ZEP 2014 2 6 10 8 0 2014-02-06T10:08:00Z 2014.099786910198 6718-66 1929.74 0.91 78.9067 11.8883 479.0 474.0 5.0 P 364520 H11 2014-02-25T16:06:00 ... ZEP 2014 2 13 10 20 0 2014-02-13T10:20:00Z 2014.11898782344 1287-99 1957.81 0.91 78.9067 11.8883 479.0 474.0 5.0 P 365087 H11 2014-03-10T12:40:00 .S. ZEP 2014 2 13 10 20 0 2014-02-13T10:20:00Z 2014.11898782344 1288-99 1956.59 0.91 78.9067 11.8883 479.0 474.0 5.0 P 365088 H11 2014-03-10T12:56:00 .S. ZEP 2014 2 20 10 8 0 2014-02-20T10:08:00Z 2014.1381430745814 2453-99 1912.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 365089 H11 2014-03-10T13:12:00 ... ZEP 2014 2 20 10 8 0 2014-02-20T10:08:00Z 2014.1381430745814 2454-99 1911.97 0.91 78.9067 11.8883 479.0 474.0 5.0 P 365090 H11 2014-03-10T13:28:00 ... ZEP 2014 2 27 9 39 0 2014-02-27T09:39:00Z 2014.1572659817352 1333-99 1927.56 0.91 78.9067 11.8883 479.0 474.0 5.0 P 366092 H11 2014-04-04T13:32:00 ... ZEP 2014 2 27 9 39 0 2014-02-27T09:39:00Z 2014.1572659817352 1334-99 1925.97 0.91 78.9067 11.8883 479.0 474.0 5.0 P 366093 H11 2014-04-04T13:48:00 ... ZEP 2014 3 6 10 10 0 2014-03-06T10:10:00Z 2014.17650304414 5075-99 1921.15 0.91 78.9067 11.8883 479.0 474.0 5.0 P 366090 H11 2014-04-04T13:00:00 ... ZEP 2014 3 6 10 10 0 2014-03-06T10:10:00Z 2014.17650304414 5076-99 1922.47 0.91 78.9067 11.8883 479.0 474.0 5.0 P 366091 H11 2014-04-04T13:16:00 ... ZEP 2014 3 13 9 0 0 2014-03-13T09:00:00Z 2014.1955479452056 2013-99 1910.54 0.91 78.9067 11.8883 479.0 474.0 5.0 P 366486 H11 2014-04-24T14:20:00 ... ZEP 2014 3 28 9 5 0 2014-03-28T09:05:00Z 2014.236653348554 355-99 1926.36 0.91 78.9067 11.8883 479.0 474.0 5.0 P 366816 H11 2014-04-21T16:05:00 ... ZEP 2014 3 28 9 5 0 2014-03-28T09:05:00Z 2014.236653348554 356-99 1925.98 0.91 78.9067 11.8883 479.0 474.0 5.0 P 366817 H11 2014-04-21T16:21:00 ... ZEP 2014 4 3 7 53 0 2014-04-03T07:53:00Z 2014.252954718417 1379-99 1909.3 0.91 78.9067 11.8883 479.0 474.0 5.0 P 366818 H11 2014-04-21T15:01:00 ... ZEP 2014 4 3 7 53 0 2014-04-03T07:53:00Z 2014.252954718417 1380-99 1909.59 0.91 78.9067 11.8883 479.0 474.0 5.0 P 366819 H11 2014-04-21T15:17:00 ... ZEP 2014 4 10 8 0 0 2014-04-10T08:00:00Z 2014.2721461187214 1455-99 1908.92 0.91 78.9067 11.8883 479.0 474.0 5.0 P 367446 H11 2014-05-14T12:23:00 ... ZEP 2014 4 10 8 0 0 2014-04-10T08:00:00Z 2014.2721461187214 1456-99 1907.92 0.91 78.9067 11.8883 479.0 474.0 5.0 P 367447 H11 2014-05-14T12:39:00 ... ZEP 2014 4 18 9 3 0 2014-04-18T09:03:00Z 2014.2941837899543 2639-99 1915.82 0.91 78.9067 11.8883 479.0 474.0 5.0 P 367448 H11 2014-05-14T11:51:00 ... ZEP 2014 4 18 9 3 0 2014-04-18T09:03:00Z 2014.2941837899543 2640-99 1915.37 0.91 78.9067 11.8883 479.0 474.0 5.0 P 367449 H11 2014-05-14T12:07:00 ... ZEP 2014 4 24 9 11 0 2014-04-24T09:11:00Z 2014.3106373668188 5196-99 1910.22 0.91 78.9067 11.8883 479.0 474.0 5.0 P 368218 H11 2014-05-30T14:46:00 ... ZEP 2014 5 1 10 8 0 2014-05-01T10:08:00Z 2014.3299238964992 1261-99 1903.63 0.91 78.9067 11.8883 479.0 474.0 5.0 P 368219 H11 2014-05-30T15:18:00 ... ZEP 2014 5 1 10 8 0 2014-05-01T10:08:00Z 2014.3299238964992 1262-99 1903.04 0.91 78.9067 11.8883 479.0 474.0 5.0 P 368220 H11 2014-05-30T15:34:00 ... ZEP 2014 5 8 8 47 0 2014-05-08T08:47:00Z 2014.348947869102 1927-99 1904.03 0.91 78.9067 11.8883 479.0 474.0 5.0 P 369007 H11 2014-06-20T12:50:00 ... ZEP 2014 5 8 8 47 0 2014-05-08T08:47:00Z 2014.348947869102 1928-99 1905.12 0.91 78.9067 11.8883 479.0 474.0 5.0 P 369008 H11 2014-06-20T13:06:00 ... ZEP 2014 5 15 9 0 0 2014-05-15T09:00:00Z 2014.3681506849316 851-99 1904.5 0.91 78.9067 11.8883 479.0 474.0 5.0 P 369005 H11 2014-06-20T12:18:00 ... ZEP 2014 5 15 9 0 0 2014-05-15T09:00:00Z 2014.3681506849316 852-99 1904.7 0.91 78.9067 11.8883 479.0 474.0 5.0 P 369006 H11 2014-06-20T12:34:00 ... ZEP 2014 5 22 7 55 0 2014-05-22T07:55:00Z 2014.3872050989346 2065-99 1903.78 0.91 78.9067 11.8883 479.0 474.0 5.0 P 369481 H11 2014-06-26T14:32:00 ... ZEP 2014 5 22 7 55 0 2014-05-22T07:55:00Z 2014.3872050989346 2066-99 1903.43 0.91 78.9067 11.8883 479.0 474.0 5.0 P 369482 H11 2014-06-26T14:48:00 ... ZEP 2014 5 29 10 27 0 2014-05-29T10:27:00Z 2014.4066723744293 4675-99 1896.67 0.91 78.9067 11.8883 479.0 474.0 5.0 P 369483 H11 2014-06-26T15:20:00 ... ZEP 2014 5 29 10 27 0 2014-05-29T10:27:00Z 2014.4066723744293 4676-99 1896.96 0.91 78.9067 11.8883 479.0 474.0 5.0 P 369484 H11 2014-06-26T15:04:00 ... ZEP 2014 6 5 8 0 0 2014-06-05T08:00:00Z 2014.4255707762557 2923-99 1890.54 0.91 78.9067 11.8883 479.0 474.0 5.0 P 370129 H11 2014-07-09T15:35:00 ... ZEP 2014 6 5 8 0 0 2014-06-05T08:00:00Z 2014.4255707762557 2924-99 1891.05 0.91 78.9067 11.8883 479.0 474.0 5.0 P 370130 H11 2014-07-09T15:51:00 ... ZEP 2014 6 12 7 50 0 2014-06-12T07:50:00Z 2014.4447298325722 989-99 1891.24 0.91 78.9067 11.8883 479.0 474.0 5.0 P 370127 H11 2014-07-09T15:03:00 ... ZEP 2014 6 12 7 50 0 2014-06-12T07:50:00Z 2014.4447298325722 990-99 1891.96 0.91 78.9067 11.8883 479.0 474.0 5.0 P 370128 H11 2014-07-09T15:19:00 ... ZEP 2014 6 19 9 15 0 2014-06-19T09:15:00Z 2014.4640696347033 1235-99 1885.11 0.91 78.9067 11.8883 479.0 474.0 5.0 P 370752 H11 2014-07-23T12:52:00 ... ZEP 2014 6 19 9 15 0 2014-06-19T09:15:00Z 2014.4640696347033 1236-99 1885.58 0.91 78.9067 11.8883 479.0 474.0 5.0 P 370753 H11 2014-07-23T13:08:00 ... ZEP 2014 6 26 8 55 0 2014-06-26T08:55:00Z 2014.4832096651446 4567-99 1879.1 0.91 78.9067 11.8883 479.0 474.0 5.0 P 370750 H11 2014-07-23T13:24:00 ... ZEP 2014 6 26 8 55 0 2014-06-26T08:55:00Z 2014.4832096651446 4568-99 1878.71 0.91 78.9067 11.8883 479.0 474.0 5.0 P 370751 H11 2014-07-23T13:40:00 ... ZEP 2014 7 3 7 45 0 2014-07-03T07:45:00Z 2014.50225456621 2591-99 1879.86 0.91 78.9067 11.8883 479.0 474.0 5.0 P 371327 H11 2014-08-01T10:26:00 ... ZEP 2014 7 3 7 45 0 2014-07-03T07:45:00Z 2014.50225456621 2592-99 1879.1 0.91 78.9067 11.8883 479.0 474.0 5.0 P 371328 H11 2014-08-01T10:42:00 ... ZEP 2014 7 10 7 41 0 2014-07-10T07:41:00Z 2014.5214250380518 6537-66 1876.2 0.91 78.9067 11.8883 479.0 474.0 5.0 P 371329 H11 2014-08-01T09:54:00 ... ZEP 2014 7 10 7 41 0 2014-07-10T07:41:00Z 2014.5214250380518 6538-66 1876.91 0.91 78.9067 11.8883 479.0 474.0 5.0 P 371330 H11 2014-08-01T10:10:00 ... ZEP 2014 7 17 8 45 0 2014-07-17T08:45:00Z 2014.5407248858448 3251-99 1881.04 0.91 78.9067 11.8883 479.0 474.0 5.0 P 372097 H11 2014-08-15T12:21:00 ... ZEP 2014 7 17 8 45 0 2014-07-17T08:45:00Z 2014.5407248858448 3252-99 1881.42 0.91 78.9067 11.8883 479.0 474.0 5.0 P 372098 H11 2014-08-15T12:37:00 ... ZEP 2014 7 24 7 59 0 2014-07-24T07:59:00Z 2014.5598154490106 1306-99 1874.05 0.91 78.9067 11.8883 479.0 474.0 5.0 P 372095 H11 2014-08-15T12:53:00 ... ZEP 2014 7 24 7 59 0 2014-07-24T07:59:00Z 2014.5598154490106 1307-99 1874.82 0.91 78.9067 11.8883 479.0 474.0 5.0 P 372096 H11 2014-08-15T13:09:00 ... ZEP 2014 7 31 8 5 0 2014-07-31T08:05:00Z 2014.5790049467275 2753-99 1876.39 0.91 78.9067 11.8883 479.0 474.0 5.0 P 372889 H11 2014-08-26T16:26:00 ... ZEP 2014 7 31 8 5 0 2014-07-31T08:05:00Z 2014.5790049467275 2754-99 1874.75 0.91 78.9067 11.8883 479.0 474.0 5.0 P 372890 H11 2014-08-26T16:42:00 ... ZEP 2014 8 7 9 1 0 2014-08-07T09:01:00Z 2014.5982895738205 129-99 1877.48 0.91 78.9067 11.8883 479.0 474.0 5.0 P 372887 H11 2014-08-26T15:54:00 ... ZEP 2014 8 7 9 1 0 2014-08-07T09:01:00Z 2014.5982895738205 130-99 1878.93 0.91 78.9067 11.8883 479.0 474.0 5.0 P 372888 H11 2014-08-26T16:10:00 ... ZEP 2014 8 14 9 10 0 2014-08-14T09:10:00Z 2014.6174847793 1559-99 1879.51 0.91 78.9067 11.8883 479.0 474.0 5.0 P 373637 H11 2014-09-09T10:59:00 ... ZEP 2014 8 21 8 8 0 2014-08-21T08:08:00Z 2014.6365449010655 2049-99 1884.65 0.91 78.9067 11.8883 479.0 474.0 5.0 P 373638 H11 2014-09-09T11:31:00 ... ZEP 2014 8 21 8 8 0 2014-08-21T08:08:00Z 2014.6365449010655 2050-99 1882.45 0.91 78.9067 11.8883 479.0 474.0 5.0 P 373639 H11 2014-09-09T11:47:00 ... ZEP 2014 8 28 8 15 0 2014-08-28T08:15:00Z 2014.6557363013699 4310-99 1879.52 0.91 78.9067 11.8883 479.0 474.0 5.0 P 374376 H11 2014-09-26T12:30:00 ... ZEP 2014 9 4 8 5 0 2014-09-04T08:05:00Z 2014.6748953576864 4787-99 1896.43 0.91 78.9067 11.8883 479.0 474.0 5.0 P 374377 H11 2014-09-24T09:56:00 ... ZEP 2014 9 4 8 5 0 2014-09-04T08:05:00Z 2014.6748953576864 4788-99 1895.93 0.91 78.9067 11.8883 479.0 474.0 5.0 P 374378 H11 2014-09-24T10:12:00 ... ZEP 2014 9 11 8 1 0 2014-09-11T08:01:00Z 2014.6940658295282 3963-99 1897.24 0.91 78.9067 11.8883 479.0 474.0 5.0 P 374866 H11 2014-10-03T09:38:00 ... ZEP 2014 9 11 8 1 0 2014-09-11T08:01:00Z 2014.6940658295282 3964-99 1897.62 0.91 78.9067 11.8883 479.0 474.0 5.0 P 374867 H11 2014-10-03T09:54:00 ... ZEP 2014 9 19 7 40 0 2014-09-19T07:40:00Z 2014.7159436834095 2853-99 1918.02 0.91 78.9067 11.8883 479.0 474.0 5.0 P 374984 H11 2014-10-06T12:44:00 ... ZEP 2014 9 19 7 40 0 2014-09-19T07:40:00Z 2014.7159436834095 2854-99 1917.68 0.91 78.9067 11.8883 479.0 474.0 5.0 P 374985 H11 2014-10-06T13:00:00 ... ZEP 2014 9 26 9 45 0 2014-09-26T09:45:00Z 2014.735359589041 133-99 1930.17 0.91 78.9067 11.8883 479.0 474.0 5.0 P 375781 H11 2014-10-20T11:08:00 ... ZEP 2014 9 26 9 45 0 2014-09-26T09:45:00Z 2014.735359589041 134-99 1929.28 0.91 78.9067 11.8883 479.0 474.0 5.0 P 375782 H11 2014-10-20T11:24:00 ... ZEP 2014 10 2 7 43 0 2014-10-02T07:43:00Z 2014.751565829528 935-99 1914.99 0.91 78.9067 11.8883 479.0 474.0 5.0 P 375783 H11 2014-10-20T10:36:00 ... ZEP 2014 10 2 7 43 0 2014-10-02T07:43:00Z 2014.751565829528 936-99 1915.21 0.91 78.9067 11.8883 479.0 474.0 5.0 P 375784 H11 2014-10-20T10:52:00 ... ZEP 2014 10 9 8 0 0 2014-10-09T08:00:00Z 2014.7707762557077 1261-99 1912.36 0.91 78.9067 11.8883 479.0 474.0 5.0 P 376696 H11 2014-11-11T15:07:00 ... ZEP 2014 10 9 8 0 0 2014-10-09T08:00:00Z 2014.7707762557077 1262-99 1912.51 0.91 78.9067 11.8883 479.0 474.0 5.0 P 376697 H11 2014-11-11T15:23:00 ... ZEP 2014 10 16 8 5 0 2014-10-16T08:05:00Z 2014.7899638508372 3251-99 1914.13 0.91 78.9067 11.8883 479.0 474.0 5.0 P 376694 H11 2014-11-11T15:39:00 ... ZEP 2014 10 16 8 5 0 2014-10-16T08:05:00Z 2014.7899638508372 3252-99 1913.57 0.91 78.9067 11.8883 479.0 474.0 5.0 P 376695 H11 2014-11-11T15:55:00 ... ZEP 2014 10 23 9 10 0 2014-10-23T09:10:00Z 2014.8092656012177 3303-99 1915.01 0.91 78.9067 11.8883 479.0 474.0 5.0 P 377492 H11 2014-11-26T09:38:00 ... ZEP 2014 10 23 9 10 0 2014-10-23T09:10:00Z 2014.8092656012177 3304-99 1914.88 0.91 78.9067 11.8883 479.0 474.0 5.0 P 377493 H11 2014-11-26T09:54:00 ... ZEP 2014 10 30 8 41 0 2014-10-30T08:41:00Z 2014.8283885083713 5079-99 1905.18 0.91 78.9067 11.8883 479.0 474.0 5.0 P 377490 H11 2014-11-25T15:43:00 ... ZEP 2014 10 30 8 41 0 2014-10-30T08:41:00Z 2014.8283885083713 5080-99 1905.42 0.91 78.9067 11.8883 479.0 474.0 5.0 P 377491 H11 2014-11-25T15:59:00 ... ZEP 2014 11 6 10 25 0 2014-11-06T10:25:00Z 2014.847764459665 307-99 1916.7 0.91 78.9067 11.8883 479.0 474.0 5.0 P 378350 H11 2014-12-10T13:12:00 ... ZEP 2014 11 6 10 25 0 2014-11-06T10:25:00Z 2014.847764459665 308-99 1916.49 0.91 78.9067 11.8883 479.0 474.0 5.0 P 378351 H11 2014-12-10T13:28:00 ... ZEP 2014 11 13 10 24 0 2014-11-13T10:24:00Z 2014.8669406392694 3217-99 1928.85 0.91 78.9067 11.8883 479.0 474.0 5.0 P 378348 H11 2014-12-10T13:45:00 ... ZEP 2014 11 13 10 24 0 2014-11-13T10:24:00Z 2014.8669406392694 3218-99 1926.49 0.91 78.9067 11.8883 479.0 474.0 5.0 P 378349 H11 2014-12-10T14:01:00 ... ZEP 2014 11 20 8 45 0 2014-11-20T08:45:00Z 2014.8859303652969 399-99 1917.06 0.91 78.9067 11.8883 479.0 474.0 5.0 P 379176 H11 2014-12-24T09:37:00 ... ZEP 2014 11 20 8 45 0 2014-11-20T08:45:00Z 2014.8859303652969 400-99 1917.34 0.91 78.9067 11.8883 479.0 474.0 5.0 P 379177 H11 2014-12-24T09:53:00 ... ZEP 2014 11 27 9 47 0 2014-11-27T09:47:00Z 2014.9052264079148 4945-99 1914.52 0.91 78.9067 11.8883 479.0 474.0 5.0 P 379174 H11 2014-12-24T09:05:00 ... ZEP 2014 11 27 9 47 0 2014-11-27T09:47:00Z 2014.9052264079148 4946-99 1914.85 0.91 78.9067 11.8883 479.0 474.0 5.0 P 379175 H11 2014-12-24T09:21:00 ... ZEP 2014 12 4 9 20 0 2014-12-04T09:20:00Z 2014.9243531202435 559-99 1952.45 0.91 78.9067 11.8883 479.0 474.0 5.0 P 379731 H11 2015-01-12T14:35:00 ... ZEP 2014 12 4 9 20 0 2014-12-04T09:20:00Z 2014.9243531202435 560-99 1951.77 0.91 78.9067 11.8883 479.0 474.0 5.0 P 379732 H11 2015-01-12T14:51:00 ... ZEP 2014 12 11 9 31 0 2014-12-11T09:31:00Z 2014.943552130898 3001-99 1943.22 0.91 78.9067 11.8883 479.0 474.0 5.0 P 379729 H11 2015-01-12T14:02:00 ... ZEP 2014 12 11 9 31 0 2014-12-11T09:31:00Z 2014.943552130898 3002-99 1941.86 0.91 78.9067 11.8883 479.0 474.0 5.0 P 379730 H11 2015-01-12T14:18:00 ... ZEP 2014 12 18 10 10 0 2014-12-18T10:10:00Z 2014.9628044140031 1134-99 1979.1 0.91 78.9067 11.8883 479.0 474.0 5.0 P 380410 H11 2015-02-02T10:55:00 .S. ZEP 2014 12 18 10 10 0 2014-12-18T10:10:00Z 2014.9628044140031 2203-99 1978.58 0.91 78.9067 11.8883 479.0 474.0 5.0 P 380409 H11 2015-02-02T10:39:00 .S. ZEP 2014 12 25 13 4 0 2014-12-25T13:04:00Z 2014.982313546423 1133-99 1917.98 0.91 78.9067 11.8883 479.0 474.0 5.0 P 380407 H11 2015-01-30T17:04:00 ... ZEP 2014 12 25 13 4 0 2014-12-25T13:04:00Z 2014.982313546423 2204-99 1918.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 380408 H11 2015-01-30T17:20:00 ... ZEP 2015 1 1 12 55 0 2015-01-01T12:55:00Z 2015.0014745053272 5121-99 1927.89 0.91 78.9067 11.8883 479.0 474.0 5.0 P 380800 H11 2015-02-10T13:04:00 ... ZEP 2015 1 1 12 55 0 2015-01-01T12:55:00Z 2015.0014745053272 5122-99 1927.04 0.91 78.9067 11.8883 479.0 474.0 5.0 P 380801 H11 2015-02-10T13:20:00 ... ZEP 2015 1 8 9 27 0 2015-01-08T09:27:00Z 2015.020256849315 709-99 1917.0 0.91 78.9067 11.8883 479.0 474.0 5.0 P 380803 H11 2015-02-10T12:32:00 ... ZEP 2015 1 8 9 27 0 2015-01-08T09:27:00Z 2015.020256849315 710-99 1917.51 0.91 78.9067 11.8883 479.0 474.0 5.0 P 380802 H11 2015-02-10T12:48:00 ... ZEP 2015 1 15 9 15 0 2015-01-15T09:15:00Z 2015.0394121004567 4665-99 1910.53 0.91 78.9067 11.8883 479.0 474.0 5.0 P 382015 H11 2015-03-10T14:20:00 ... ZEP 2015 1 15 9 15 0 2015-01-15T09:15:00Z 2015.0394121004567 4666-99 1911.46 0.91 78.9067 11.8883 479.0 474.0 5.0 P 382016 H11 2015-03-10T14:36:00 ... ZEP 2015 1 22 8 20 0 2015-01-22T08:20:00Z 2015.058485540335 2863-99 1922.25 0.91 78.9067 11.8883 479.0 474.0 5.0 P 382017 H11 2015-03-10T14:52:00 ... ZEP 2015 1 22 8 20 0 2015-01-22T08:20:00Z 2015.058485540335 2864-99 1921.53 0.91 78.9067 11.8883 479.0 474.0 5.0 P 382018 H11 2015-03-10T15:07:00 ... ZEP 2015 1 29 9 32 0 2015-01-29T09:32:00Z 2015.077800608828 3485-99 1923.21 0.91 78.9067 11.8883 479.0 474.0 5.0 P 382410 H11 2015-03-18T11:24:00 ... ZEP 2015 1 29 9 32 0 2015-01-29T09:32:00Z 2015.077800608828 3486-99 1923.93 0.91 78.9067 11.8883 479.0 474.0 5.0 P 382411 H11 2015-03-18T11:40:00 ... ZEP 2015 2 6 10 5 0 2015-02-06T10:05:00Z 2015.0997812024352 5169-99 1927.92 0.91 78.9067 11.8883 479.0 474.0 5.0 P 382412 H11 2015-03-18T10:05:00 ... ZEP 2015 2 6 10 5 0 2015-02-06T10:05:00Z 2015.0997812024352 5170-99 1928.06 0.91 78.9067 11.8883 479.0 474.0 5.0 P 382413 H11 2015-03-18T10:20:00 ... ZEP 2015 2 12 8 20 0 2015-02-12T08:20:00Z 2015.11601978691 721-99 1955.33 0.91 78.9067 11.8883 479.0 474.0 5.0 P 383025 H11 2015-03-24T16:06:00 ... ZEP 2015 2 12 8 20 0 2015-02-12T08:20:00Z 2015.11601978691 722-99 1954.99 0.91 78.9067 11.8883 479.0 474.0 5.0 P 383026 H11 2015-03-24T16:22:00 ... ZEP 2015 2 19 8 26 0 2015-02-19T08:26:00Z 2015.135209284627 3111-99 1941.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 383027 H11 2015-03-24T15:34:00 ... ZEP 2015 2 19 8 26 0 2015-02-19T08:26:00Z 2015.135209284627 3112-99 1939.65 0.91 78.9067 11.8883 479.0 474.0 5.0 P 383028 H11 2015-03-24T15:50:00 ... ZEP 2015 2 27 9 45 0 2015-02-27T09:45:00Z 2015.1572773972603 1387-99 1916.87 0.91 78.9067 11.8883 479.0 474.0 5.0 P 384300 H11 2015-04-14T09:03:00 ... ZEP 2015 2 27 9 45 0 2015-02-27T09:45:00Z 2015.1572773972603 1388-99 1915.84 0.91 78.9067 11.8883 479.0 474.0 5.0 P 384301 H11 2015-04-14T09:19:00 ... ZEP 2015 3 5 8 35 0 2015-03-05T08:35:00Z 2015.1735825722983 629-99 1939.55 0.91 78.9067 11.8883 479.0 474.0 5.0 P 384302 H11 2015-04-14T09:35:00 ... ZEP 2015 3 5 8 35 0 2015-03-05T08:35:00Z 2015.1735825722983 630-99 1938.97 0.91 78.9067 11.8883 479.0 474.0 5.0 P 384303 H11 2015-04-14T09:50:00 ... ZEP 2015 3 12 8 45 0 2015-03-12T08:45:00Z 2015.1927796803652 5057-99 1929.71 0.91 78.9067 11.8883 479.0 474.0 5.0 P 385300 H11 2015-04-27T15:26:00 ... ZEP 2015 3 12 8 45 0 2015-03-12T08:45:00Z 2015.1927796803652 5058-99 1929.62 0.91 78.9067 11.8883 479.0 474.0 5.0 P 385301 H11 2015-04-27T15:42:00 ... ZEP 2015 3 19 8 33 0 2015-03-19T08:33:00Z 2015.211934931507 5027-99 1927.92 0.91 78.9067 11.8883 479.0 474.0 5.0 P 385299 H11 2015-04-29T11:41:00 ... ZEP 2015 3 26 8 52 0 2015-03-26T08:52:00Z 2015.2311491628616 2443-99 1917.53 0.91 78.9067 11.8883 479.0 474.0 5.0 P 385861 H11 2015-05-07T10:00:00 ... ZEP 2015 3 26 8 52 0 2015-03-26T08:52:00Z 2015.2311491628616 2444-99 1917.63 0.91 78.9067 11.8883 479.0 474.0 5.0 P 385862 H11 2015-05-07T10:16:00 ... ZEP 2015 4 2 10 17 0 2015-04-02T10:17:00Z 2015.2504889649924 4945-99 1924.68 0.91 78.9067 11.8883 479.0 474.0 5.0 P 385863 H11 2015-05-07T09:29:00 ... ZEP 2015 4 2 10 17 0 2015-04-02T10:17:00Z 2015.2504889649924 4946-99 1925.14 0.91 78.9067 11.8883 479.0 474.0 5.0 P 385864 H11 2015-05-07T09:44:00 ... ZEP 2015 4 9 7 54 0 2015-04-09T07:54:00Z 2015.269394977169 3619-99 1937.8 0.91 78.9067 11.8883 479.0 474.0 5.0 P 386547 H11 2015-05-21T09:27:00 ... ZEP 2015 4 9 7 54 0 2015-04-09T07:54:00Z 2015.269394977169 3620-99 1938.02 0.91 78.9067 11.8883 479.0 474.0 5.0 P 386548 H11 2015-05-21T09:43:00 ... ZEP 2015 4 16 7 55 0 2015-04-16T07:55:00Z 2015.2885749619481 5363-99 1923.25 0.91 78.9067 11.8883 479.0 474.0 5.0 P 386545 H11 2015-05-20T14:36:00 ... ZEP 2015 4 16 7 55 0 2015-04-16T07:55:00Z 2015.2885749619481 5364-99 1923.59 0.91 78.9067 11.8883 479.0 474.0 5.0 P 386546 H11 2015-05-20T14:52:00 ... ZEP 2015 4 23 7 46 0 2015-04-23T07:46:00Z 2015.3077359208523 2133-99 1926.94 0.91 78.9067 11.8883 479.0 474.0 5.0 P 387126 H11 2015-06-08T12:42:00 ... ZEP 2015 4 23 7 46 0 2015-04-23T07:46:00Z 2015.3077359208523 2134-99 1926.58 0.91 78.9067 11.8883 479.0 474.0 5.0 P 387127 H11 2015-06-08T12:57:00 ... ZEP 2015 4 30 8 3 0 2015-04-30T08:03:00Z 2015.326946347032 3723-99 1916.01 0.91 78.9067 11.8883 479.0 474.0 5.0 P 387128 H11 2015-06-08T12:10:00 ... ZEP 2015 4 30 8 3 0 2015-04-30T08:03:00Z 2015.326946347032 3724-99 1916.87 0.91 78.9067 11.8883 479.0 474.0 5.0 P 387129 H11 2015-06-08T12:26:00 ... ZEP 2015 5 8 8 0 0 2015-05-08T08:00:00Z 2015.3488584474885 2219-99 1913.12 0.91 78.9067 11.8883 479.0 474.0 5.0 P 388017 H11 2015-06-18T15:51:00 ... ZEP 2015 5 8 8 0 0 2015-05-08T08:00:00Z 2015.3488584474885 2220-99 1912.61 0.91 78.9067 11.8883 479.0 474.0 5.0 P 388018 H11 2015-06-18T16:06:00 ... ZEP 2015 5 14 8 30 0 2015-05-14T08:30:00Z 2015.3653538812785 5327-99 1912.73 0.91 78.9067 11.8883 479.0 474.0 5.0 P 388015 H11 2015-06-18T16:22:00 ... ZEP 2015 5 14 8 30 0 2015-05-14T08:30:00Z 2015.3653538812785 5328-99 1912.03 0.91 78.9067 11.8883 479.0 474.0 5.0 P 388016 H11 2015-06-18T16:38:00 ... ZEP 2015 5 21 9 14 0 2015-05-21T09:14:00Z 2015.384615677321 531-99 1905.6 0.91 78.9067 11.8883 479.0 474.0 5.0 P 388848 H11 2015-07-10T14:14:00 ... ZEP 2015 5 21 9 14 0 2015-05-21T09:14:00Z 2015.384615677321 532-99 1904.31 0.91 78.9067 11.8883 479.0 474.0 5.0 P 388849 H11 2015-07-10T14:30:00 ... ZEP 2015 5 28 8 20 0 2015-05-28T08:20:00Z 2015.403691019787 3849-99 1904.44 0.91 78.9067 11.8883 479.0 474.0 5.0 P 388850 H11 2015-07-10T14:46:00 ... ZEP 2015 5 28 8 20 0 2015-05-28T08:20:00Z 2015.403691019787 3850-99 1903.76 0.91 78.9067 11.8883 479.0 474.0 5.0 P 388851 H11 2015-07-10T15:02:00 ... ZEP 2015 6 4 8 37 0 2015-06-04T08:37:00Z 2015.4229014459665 1159-99 1904.52 0.91 78.9067 11.8883 479.0 474.0 5.0 P 389874 H11 2015-07-23T13:34:00 ... ZEP 2015 6 4 8 37 0 2015-06-04T08:37:00Z 2015.4229014459665 1160-99 1905.68 0.91 78.9067 11.8883 479.0 474.0 5.0 P 389875 H11 2015-07-23T13:50:00 ... ZEP 2015 6 11 7 30 0 2015-06-11T07:30:00Z 2015.4419520547945 4811-99 1907.38 0.91 78.9067 11.8883 479.0 474.0 5.0 P 389877 H11 2015-07-23T13:02:00 ... ZEP 2015 6 11 7 30 0 2015-06-11T07:30:00Z 2015.4419520547945 4812-99 1906.88 0.91 78.9067 11.8883 479.0 474.0 5.0 P 389876 H11 2015-07-23T13:18:00 ... ZEP 2015 6 18 10 5 0 2015-06-18T10:05:00Z 2015.4614250380519 1987-99 1897.06 0.91 78.9067 11.8883 479.0 474.0 5.0 P 391085 H11 2015-08-12T09:35:00 ... ZEP 2015 6 18 10 5 0 2015-06-18T10:05:00Z 2015.4614250380519 1988-99 1896.54 0.91 78.9067 11.8883 479.0 474.0 5.0 P 391086 H11 2015-08-12T09:51:00 ... ZEP 2015 6 25 8 45 0 2015-06-25T08:45:00Z 2015.480450913242 3157-99 1889.89 0.91 78.9067 11.8883 479.0 474.0 5.0 P 391087 H11 2015-08-12T10:55:00 ... ZEP 2015 6 25 8 45 0 2015-06-25T08:45:00Z 2015.480450913242 3158-99 1890.68 0.91 78.9067 11.8883 479.0 474.0 5.0 P 391088 H11 2015-08-12T11:11:00 ... ZEP 2015 7 2 7 48 0 2015-07-02T07:48:00Z 2015.4995205479452 3927-99 1889.61 0.91 78.9067 11.8883 479.0 474.0 5.0 P 391341 H11 2015-08-17T11:55:00 ... ZEP 2015 7 2 7 48 0 2015-07-02T07:48:00Z 2015.4995205479452 3928-99 1889.21 0.91 78.9067 11.8883 479.0 474.0 5.0 P 391342 H11 2015-08-17T12:11:00 ... ZEP 2015 7 9 8 21 0 2015-07-09T08:21:00Z 2015.5187614155252 5031-99 1890.76 0.91 78.9067 11.8883 479.0 474.0 5.0 P 391343 H11 2015-08-17T11:23:00 ... ZEP 2015 7 9 8 21 0 2015-07-09T08:21:00Z 2015.5187614155252 5032-99 1892.67 0.91 78.9067 11.8883 479.0 474.0 5.0 P 391344 H11 2015-08-17T11:39:00 ... ZEP 2015 7 16 12 34 56 2015-07-16T12:34:56Z 2015.5384226281076 3299-99 1891.24 0.91 78.9067 11.8883 479.0 474.0 5.0 P 392069 H11 2015-08-28T15:02:00 ... ZEP 2015 7 16 12 34 56 2015-07-16T12:34:56Z 2015.5384226281076 3300-99 1889.71 0.91 78.9067 11.8883 479.0 474.0 5.0 P 392070 H11 2015-08-28T15:17:00 ... ZEP 2015 7 23 8 48 0 2015-07-23T08:48:00Z 2015.5571689497717 851-99 1885.24 0.91 78.9067 11.8883 479.0 474.0 5.0 P 392067 H11 2015-08-28T14:29:00 ... ZEP 2015 7 23 8 48 0 2015-07-23T08:48:00Z 2015.5571689497717 852-99 1884.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 392068 H11 2015-08-28T14:44:00 ... ZEP 2015 7 30 8 1 0 2015-07-30T08:01:00Z 2015.57625761035 4659-99 1947.87 0.91 78.9067 11.8883 479.0 474.0 5.0 P 393298 H11 2015-09-10T15:28:00 .S. ZEP 2015 7 30 8 1 0 2015-07-30T08:01:00Z 2015.57625761035 4660-99 1945.73 0.91 78.9067 11.8883 479.0 474.0 5.0 P 393299 H11 2015-09-10T15:44:00 .S. ZEP 2015 8 6 9 15 0 2015-08-06T09:15:00Z 2015.5955764840182 983-99 1911.37 0.91 78.9067 11.8883 479.0 474.0 5.0 P 393300 H11 2015-09-11T09:25:00 ... ZEP 2015 8 6 9 15 0 2015-08-06T09:15:00Z 2015.5955764840182 984-99 1911.85 0.91 78.9067 11.8883 479.0 474.0 5.0 P 393301 H11 2015-09-11T09:41:00 ... ZEP 2015 8 13 7 43 0 2015-08-13T07:43:00Z 2015.6145795281584 2233-99 1892.46 0.91 78.9067 11.8883 479.0 474.0 5.0 P 393742 H11 2015-09-17T10:55:00 ... ZEP 2015 8 13 7 43 0 2015-08-13T07:43:00Z 2015.6145795281584 2234-99 1893.6 0.91 78.9067 11.8883 479.0 474.0 5.0 P 393743 H11 2015-09-17T11:11:00 ... ZEP 2015 8 20 7 50 0 2015-08-20T07:50:00Z 2015.6337709284628 4771-99 1893.37 0.91 78.9067 11.8883 479.0 474.0 5.0 P 393744 H11 2015-09-17T11:27:00 ... ZEP 2015 8 20 7 50 0 2015-08-20T07:50:00Z 2015.6337709284628 4772-99 1894.18 0.91 78.9067 11.8883 479.0 474.0 5.0 P 393745 H11 2015-09-17T11:42:00 ... ZEP 2015 8 27 9 6 0 2015-08-27T09:06:00Z 2015.653093607306 119-99 1898.44 0.91 78.9067 11.8883 479.0 474.0 5.0 P 394670 H11 2015-09-30T12:21:00 ... ZEP 2015 8 27 9 6 0 2015-08-27T09:06:00Z 2015.653093607306 120-99 1898.32 0.91 78.9067 11.8883 479.0 474.0 5.0 P 394671 H11 2015-09-30T12:37:00 ... ZEP 2015 9 3 3 5 0 2015-09-03T03:05:00Z 2015.6715848554034 4675-99 1909.38 0.91 78.9067 11.8883 479.0 474.0 5.0 P 394672 H11 2015-09-30T11:49:00 ... ZEP 2015 9 3 3 5 0 2015-09-03T03:05:00Z 2015.6715848554034 4676-99 1909.37 0.91 78.9067 11.8883 479.0 474.0 5.0 P 394673 H11 2015-09-30T12:05:00 ... ZEP 2015 9 10 9 25 0 2015-09-10T09:25:00Z 2015.6914859208523 465-99 1918.31 0.91 78.9067 11.8883 479.0 474.0 5.0 P 395631 H11 2015-10-19T14:33:00 ... ZEP 2015 9 10 9 25 0 2015-09-10T09:25:00Z 2015.6914859208523 466-99 1918.39 0.91 78.9067 11.8883 479.0 474.0 5.0 P 395632 H11 2015-10-19T14:49:00 ... ZEP 2015 9 17 8 50 0 2015-09-17T08:50:00Z 2015.7105974124809 4245-99 1907.17 0.91 78.9067 11.8883 479.0 474.0 5.0 P 395633 H11 2015-10-19T14:01:00 ... ZEP 2015 9 17 8 50 0 2015-09-17T08:50:00Z 2015.7105974124809 4246-99 1907.31 0.91 78.9067 11.8883 479.0 474.0 5.0 P 395634 H11 2015-10-19T14:17:00 ... ZEP 2015 9 24 8 10 0 2015-09-24T08:10:00Z 2015.729699391172 4973-99 1917.64 0.91 78.9067 11.8883 479.0 474.0 5.0 P 396238 H11 2015-10-26T15:02:00 ... ZEP 2015 9 24 8 10 0 2015-09-24T08:10:00Z 2015.729699391172 4974-99 1916.95 0.91 78.9067 11.8883 479.0 474.0 5.0 P 396239 H11 2015-10-26T15:18:00 ... ZEP 2015 10 1 7 39 0 2015-10-01T07:39:00Z 2015.7488184931508 3191-99 1923.58 0.91 78.9067 11.8883 479.0 474.0 5.0 P 396240 H11 2015-10-26T14:31:00 ... ZEP 2015 10 1 7 39 0 2015-10-01T07:39:00Z 2015.7488184931508 3192-99 1923.02 0.91 78.9067 11.8883 479.0 474.0 5.0 P 396241 H11 2015-10-26T14:47:00 ... ZEP 2015 10 8 12 34 56 2015-10-08T12:34:56Z 2015.768559614409 2541-99 1930.31 0.91 78.9067 11.8883 479.0 474.0 5.0 P 396991 H11 2015-11-04T11:02:00 ... ZEP 2015 10 8 12 34 56 2015-10-08T12:34:56Z 2015.768559614409 2542-99 1931.31 0.91 78.9067 11.8883 479.0 474.0 5.0 P 396992 H11 2015-11-04T11:18:00 ... ZEP 2015 10 15 7 56 0 2015-10-15T07:56:00Z 2015.7872070015221 3649-99 1917.69 0.91 78.9067 11.8883 479.0 474.0 5.0 P 396989 H11 2015-11-04T11:34:00 ... ZEP 2015 10 15 7 56 0 2015-10-15T07:56:00Z 2015.7872070015221 3650-99 1917.79 0.91 78.9067 11.8883 479.0 474.0 5.0 P 396990 H11 2015-11-04T11:50:00 ... ZEP 2015 10 22 8 9 0 2015-10-22T08:09:00Z 2015.8064098173516 1953-99 1929.0 0.91 78.9067 11.8883 479.0 474.0 5.0 P 397735 H11 2015-11-18T13:16:00 ... ZEP 2015 10 22 8 9 0 2015-10-22T08:09:00Z 2015.8064098173516 1954-99 1929.56 0.91 78.9067 11.8883 479.0 474.0 5.0 P 397734 H11 2015-11-18T13:32:00 ... ZEP 2015 10 29 9 40 0 2015-10-29T09:40:00Z 2015.8257610350076 5341-99 1920.03 0.91 78.9067 11.8883 479.0 474.0 5.0 P 397736 H11 2015-11-18T13:48:00 ... ZEP 2015 10 29 9 40 0 2015-10-29T09:40:00Z 2015.8257610350076 5342-99 1920.81 0.91 78.9067 11.8883 479.0 474.0 5.0 P 397737 H11 2015-11-18T14:04:00 ... ZEP 2015 11 5 8 40 0 2015-11-05T08:40:00Z 2015.8448249619482 2637-99 1932.4 0.91 78.9067 11.8883 479.0 474.0 5.0 P 398412 H11 2015-12-03T13:13:00 ... ZEP 2015 11 5 8 40 0 2015-11-05T08:40:00Z 2015.8448249619482 2638-99 1931.25 0.91 78.9067 11.8883 479.0 474.0 5.0 P 398413 H11 2015-12-03T13:28:00 ... ZEP 2015 11 12 8 38 0 2015-11-12T08:38:00Z 2015.8639992389649 3535-99 1936.39 0.91 78.9067 11.8883 479.0 474.0 5.0 P 398411 H11 2015-12-03T13:44:00 ... ZEP 2015 11 12 8 38 0 2015-11-12T08:38:00Z 2015.8639992389649 3536-99 1936.62 0.91 78.9067 11.8883 479.0 474.0 5.0 P 398410 H11 2015-12-03T14:00:00 ... ZEP 2015 11 19 8 53 0 2015-11-19T08:53:00Z 2015.8832058599696 2453-99 1949.14 0.91 78.9067 11.8883 479.0 474.0 5.0 P 398979 H11 2015-12-29T12:12:00 ... ZEP 2015 11 19 8 53 0 2015-11-19T08:53:00Z 2015.8832058599696 2454-99 1949.22 0.91 78.9067 11.8883 479.0 474.0 5.0 P 398980 H11 2015-12-29T12:28:00 ... ZEP 2015 11 26 9 40 0 2015-11-26T09:40:00Z 2015.9024733637748 641-99 1932.33 0.91 78.9067 11.8883 479.0 474.0 5.0 P 398981 H11 2015-12-29T11:40:00 ... ZEP 2015 11 26 9 40 0 2015-11-26T09:40:00Z 2015.9024733637748 642-99 1932.79 0.91 78.9067 11.8883 479.0 474.0 5.0 P 398982 H11 2015-12-29T11:56:00 ... ZEP 2015 12 3 8 0 0 2015-12-03T08:00:00Z 2015.9214611872146 2017-99 1955.58 0.91 78.9067 11.8883 479.0 474.0 5.0 P 399824 H11 2016-01-11T11:08:00 ... ZEP 2015 12 3 8 0 0 2015-12-03T08:00:00Z 2015.9214611872146 2018-99 1955.88 0.91 78.9067 11.8883 479.0 474.0 5.0 P 399825 H11 2016-01-11T11:24:00 ... ZEP 2015 12 10 9 20 0 2015-12-10T09:20:00Z 2015.9407914764079 757-99 1931.43 0.91 78.9067 11.8883 479.0 474.0 5.0 P 399822 H11 2016-01-11T11:40:00 ... ZEP 2015 12 10 9 20 0 2015-12-10T09:20:00Z 2015.9407914764079 758-99 1931.2 0.91 78.9067 11.8883 479.0 474.0 5.0 P 399823 H11 2016-01-11T11:55:00 ... ZEP 2015 12 17 8 20 0 2015-12-17T08:20:00Z 2015.9598554033485 3485-99 1928.44 0.91 78.9067 11.8883 479.0 474.0 5.0 P 401185 H11 2016-01-29T14:48:00 ... ZEP 2015 12 17 8 20 0 2015-12-17T08:20:00Z 2015.9598554033485 3486-99 1928.47 0.91 78.9067 11.8883 479.0 474.0 5.0 P 401186 H11 2016-01-29T15:04:00 ... ZEP 2015 12 24 9 10 0 2015-12-24T09:10:00Z 2015.9791286149164 2711-99 1923.86 0.91 78.9067 11.8883 479.0 474.0 5.0 P 401189 H11 2016-01-29T14:17:00 ... ZEP 2015 12 24 9 10 0 2015-12-24T09:10:00Z 2015.9791286149164 2712-99 1923.28 0.91 78.9067 11.8883 479.0 474.0 5.0 P 401190 H11 2016-01-29T14:32:00 ... ZEP 2016 1 1 7 47 0 2016-01-01T07:47:00Z 2016.000886080753 1443-99 1922.85 0.91 78.9067 11.8883 479.0 474.0 5.0 P 401406 H11 2016-02-09T10:18:00 ... ZEP 2016 1 1 7 47 0 2016-01-01T07:47:00Z 2016.000886080753 1444-99 1923.21 0.91 78.9067 11.8883 479.0 474.0 5.0 P 401407 H11 2016-02-09T10:33:00 ... ZEP 2016 1 7 9 20 0 2016-01-07T09:20:00Z 2016.0174559805707 2651-99 1932.24 0.91 78.9067 11.8883 479.0 474.0 5.0 P 401408 H11 2016-02-09T10:49:00 ... ZEP 2016 1 7 9 20 0 2016-01-07T09:20:00Z 2016.0174559805707 2652-99 1932.28 0.91 78.9067 11.8883 479.0 474.0 5.0 P 401409 H11 2016-02-09T11:05:00 ... ZEP 2016 1 14 8 20 0 2016-01-14T08:20:00Z 2016.0364678202793 2885-99 1930.93 0.91 78.9067 11.8883 479.0 474.0 5.0 P 402081 H11 2016-02-17T12:40:00 ... ZEP 2016 1 14 8 20 0 2016-01-14T08:20:00Z 2016.0364678202793 2886-99 1930.99 0.91 78.9067 11.8883 479.0 474.0 5.0 P 402082 H11 2016-02-17T12:56:00 ... ZEP 2016 1 21 8 37 0 2016-01-21T08:37:00Z 2016.0556257589558 5243-99 1929.04 0.91 78.9067 11.8883 479.0 474.0 5.0 P 402079 H11 2016-02-17T12:08:00 ... ZEP 2016 1 21 8 37 0 2016-01-21T08:37:00Z 2016.0556257589558 5244-99 1930.19 0.91 78.9067 11.8883 479.0 474.0 5.0 P 402080 H11 2016-02-17T12:24:00 ... ZEP 2016 1 28 8 50 0 2016-01-28T08:50:00Z 2016.0747761080752 3529-99 1950.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 402527 H11 2016-02-23T17:40:00 ... ZEP 2016 1 28 8 50 0 2016-01-28T08:50:00Z 2016.0747761080752 3530-99 1951.61 0.91 78.9067 11.8883 479.0 474.0 5.0 P 402528 H11 2016-02-23T17:56:00 ... ZEP 2016 2 4 9 15 0 2016-02-04T09:15:00Z 2016.0939492258651 4239-99 1985.34 0.91 78.9067 11.8883 479.0 474.0 5.0 P 402821 H11 2016-03-01T11:33:00 .S. ZEP 2016 2 4 9 15 0 2016-02-04T09:15:00Z 2016.0939492258651 4240-99 1985.15 0.91 78.9067 11.8883 479.0 474.0 5.0 P 402822 H11 2016-03-01T11:49:00 .S. ZEP 2016 2 11 8 26 0 2016-02-11T08:26:00Z 2016.1129819368548 3417-99 1959.4 0.91 78.9067 11.8883 479.0 474.0 5.0 P 403266 H11 2016-03-09T14:19:00 ... ZEP 2016 2 11 8 26 0 2016-02-11T08:26:00Z 2016.1129819368548 3418-99 1959.1 0.91 78.9067 11.8883 479.0 474.0 5.0 P 403267 H11 2016-03-09T14:34:00 ... ZEP 2016 2 18 8 35 0 2016-02-18T08:35:00Z 2016.1321246964178 3283-99 1938.44 0.91 78.9067 11.8883 479.0 474.0 5.0 P 403264 H11 2016-03-09T14:54:00 ... ZEP 2016 2 18 8 35 0 2016-02-18T08:35:00Z 2016.1321246964178 3284-99 1938.41 0.91 78.9067 11.8883 479.0 474.0 5.0 P 403265 H11 2016-03-09T15:10:00 ... ZEP 2016 2 25 8 35 0 2016-02-25T08:35:00Z 2016.151250379478 4107-99 1957.33 0.91 78.9067 11.8883 479.0 474.0 5.0 P 403868 H11 2016-03-25T11:52:00 ... ZEP 2016 2 25 8 35 0 2016-02-25T08:35:00Z 2016.151250379478 4108-99 1958.83 0.91 78.9067 11.8883 479.0 474.0 5.0 P 403869 H11 2016-03-25T12:08:00 ... ZEP 2016 3 3 8 30 0 2016-03-03T08:30:00Z 2016.170366575592 885-99 1933.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 403866 H11 2016-03-25T11:20:00 ... ZEP 2016 3 3 8 30 0 2016-03-03T08:30:00Z 2016.170366575592 886-99 1933.93 0.91 78.9067 11.8883 479.0 474.0 5.0 P 403867 H11 2016-03-25T11:36:00 ... ZEP 2016 3 10 8 25 0 2016-03-10T08:25:00Z 2016.189482771706 1071-99 1942.62 0.91 78.9067 11.8883 479.0 474.0 5.0 P 404848 H11 2016-04-11T13:59:00 ... ZEP 2016 3 10 8 25 0 2016-03-10T08:25:00Z 2016.189482771706 1072-99 1942.62 0.91 78.9067 11.8883 479.0 474.0 5.0 P 404849 H11 2016-04-11T14:15:00 ... ZEP 2016 3 17 9 5 0 2016-03-17T09:05:00Z 2016.208684350334 3885-99 1937.49 0.91 78.9067 11.8883 479.0 474.0 5.0 P 404850 H11 2016-04-11T14:32:00 ... ZEP 2016 3 17 9 5 0 2016-03-17T09:05:00Z 2016.208684350334 3886-99 1936.39 0.91 78.9067 11.8883 479.0 474.0 5.0 P 404851 H11 2016-04-11T14:48:00 ... ZEP 2016 3 18 8 18 0 2016-03-18T08:18:00Z 2016.211327413479 847-99 1937.73 0.91 78.9067 11.8883 479.0 474.0 5.0 P 405363 H11 2016-04-19T10:58:00 ... ZEP 2016 3 18 8 18 0 2016-03-18T08:18:00Z 2016.211327413479 848-99 1936.81 0.91 78.9067 11.8883 479.0 474.0 5.0 P 405364 H11 2016-04-19T11:14:00 ... ZEP 2016 3 24 11 16 0 2016-03-24T11:16:00Z 2016.2280585913782 229-99 1975.43 0.91 78.9067 11.8883 479.0 474.0 5.0 P 405361 H11 2016-04-19T10:26:00 .S. ZEP 2016 3 24 11 16 0 2016-03-24T11:16:00Z 2016.2280585913782 230-99 1973.98 0.91 78.9067 11.8883 479.0 474.0 5.0 P 405362 H11 2016-04-19T10:42:00 .S. ZEP 2016 3 31 7 51 0 2016-03-31T07:51:00Z 2016.2467953096539 1797-99 1957.53 0.91 78.9067 11.8883 479.0 474.0 5.0 P 406533 H11 2016-05-11T10:07:00 ... ZEP 2016 3 31 7 51 0 2016-03-31T07:51:00Z 2016.2467953096539 1798-99 1956.45 0.91 78.9067 11.8883 479.0 474.0 5.0 P 406534 H11 2016-05-11T10:23:00 ... ZEP 2016 4 7 12 15 0 2016-04-07T12:15:00Z 2016.266421903461 851-99 1928.28 0.91 78.9067 11.8883 479.0 474.0 5.0 P 406531 H11 2016-05-11T10:39:00 ... ZEP 2016 4 7 12 15 0 2016-04-07T12:15:00Z 2016.266421903461 852-99 1929.69 0.91 78.9067 11.8883 479.0 474.0 5.0 P 406532 H11 2016-05-11T10:54:00 ... ZEP 2016 4 14 8 20 0 2016-04-14T08:20:00Z 2016.2851017000607 2363-99 1931.98 0.91 78.9067 11.8883 479.0 474.0 5.0 P 407927 H11 2016-06-15T13:15:00 ... ZEP 2016 4 14 8 20 0 2016-04-14T08:20:00Z 2016.2851017000607 2364-99 1932.33 0.91 78.9067 11.8883 479.0 474.0 5.0 P 407928 H11 2016-06-15T13:31:00 ... ZEP 2016 4 21 9 41 0 2016-04-21T09:41:00Z 2016.3043810716454 5111-99 1931.33 0.91 78.9067 11.8883 479.0 474.0 5.0 P 407925 H11 2016-06-15T13:47:00 ... ZEP 2016 4 21 9 41 0 2016-04-21T09:41:00Z 2016.3043810716454 5112-99 1931.02 0.91 78.9067 11.8883 479.0 474.0 5.0 P 407926 H11 2016-06-15T14:03:00 ... ZEP 2016 4 28 7 55 0 2016-04-28T07:55:00Z 2016.3233056314511 1261-99 1921.87 0.91 78.9067 11.8883 479.0 474.0 5.0 P 408334 H11 2016-06-17T10:47:00 ... ZEP 2016 4 28 7 55 0 2016-04-28T07:55:00Z 2016.3233056314511 1262-99 1921.05 0.91 78.9067 11.8883 479.0 474.0 5.0 P 408335 H11 2016-06-17T11:03:00 ... ZEP 2016 5 5 7 55 0 2016-05-05T07:55:00Z 2016.3424313145113 1121-99 1928.69 0.91 78.9067 11.8883 479.0 474.0 5.0 P 409331 H11 2016-06-22T13:22:00 ... ZEP 2016 5 5 7 55 0 2016-05-05T07:55:00Z 2016.3424313145113 1122-99 1929.51 0.91 78.9067 11.8883 479.0 474.0 5.0 P 409332 H11 2016-06-22T13:38:00 ... ZEP 2016 5 12 8 26 0 2016-05-12T08:26:00Z 2016.3616158166362 3419-99 1925.41 0.91 78.9067 11.8883 479.0 474.0 5.0 P 408429 H11 2016-06-16T15:59:00 ... ZEP 2016 5 12 8 26 0 2016-05-12T08:26:00Z 2016.3616158166362 3420-99 1925.65 0.91 78.9067 11.8883 479.0 474.0 5.0 P 408430 H11 2016-06-16T16:15:00 ... ZEP 2016 5 19 9 30 0 2016-05-19T09:30:00Z 2016.3808629326047 3629-99 1921.86 0.91 78.9067 11.8883 479.0 474.0 5.0 P 408431 H11 2016-06-16T16:31:00 ... ZEP 2016 5 19 9 30 0 2016-05-19T09:30:00Z 2016.3808629326047 3630-99 1921.7 0.91 78.9067 11.8883 479.0 474.0 5.0 P 408432 H11 2016-06-16T16:47:00 ... ZEP 2016 5 26 8 17 0 2016-05-26T08:17:00Z 2016.3998501062538 1225-99 1912.86 0.91 78.9067 11.8883 479.0 474.0 5.0 P 409280 H11 2016-06-29T13:24:00 ... ZEP 2016 5 26 8 17 0 2016-05-26T08:17:00Z 2016.3998501062538 1226-99 1913.98 0.91 78.9067 11.8883 479.0 474.0 5.0 P 409281 H11 2016-06-29T13:40:00 ... ZEP 2016 6 2 7 40 0 2016-06-02T07:40:00Z 2016.4189055859138 3151-99 1911.45 0.91 78.9067 11.8883 479.0 474.0 5.0 P 409282 H11 2016-06-29T12:53:00 ... ZEP 2016 6 2 7 40 0 2016-06-02T07:40:00Z 2016.4189055859138 3152-99 1912.0 0.91 78.9067 11.8883 479.0 474.0 5.0 P 409283 H11 2016-06-29T13:08:00 ... ZEP 2016 6 9 7 41 0 2016-06-09T07:41:00Z 2016.438033166363 131-99 1906.92 0.91 78.9067 11.8883 479.0 474.0 5.0 P 410135 H11 2016-07-15T11:48:00 ... ZEP 2016 6 9 7 41 0 2016-06-09T07:41:00Z 2016.438033166363 132-99 1906.79 0.91 78.9067 11.8883 479.0 474.0 5.0 P 410136 H11 2016-07-15T12:04:00 ... ZEP 2016 6 16 7 55 0 2016-06-16T07:55:00Z 2016.457185412872 4065-99 1917.13 0.91 78.9067 11.8883 479.0 474.0 5.0 P 410133 H11 2016-07-15T11:17:00 ... ZEP 2016 6 16 7 55 0 2016-06-16T07:55:00Z 2016.457185412872 4066-99 1917.79 0.91 78.9067 11.8883 479.0 474.0 5.0 P 410134 H11 2016-07-15T11:32:00 ... ZEP 2016 6 23 8 10 0 2016-06-23T08:10:00Z 2016.47633955677 2017-99 1899.76 0.91 78.9067 11.8883 479.0 474.0 5.0 P 411183 H11 2016-07-28T12:56:00 ... ZEP 2016 6 23 8 10 0 2016-06-23T08:10:00Z 2016.47633955677 2018-99 1898.18 0.91 78.9067 11.8883 479.0 474.0 5.0 P 411184 H11 2016-07-28T13:12:00 ... ZEP 2016 6 30 7 50 0 2016-06-30T07:50:00Z 2016.495427292046 2713-99 1897.74 0.91 78.9067 11.8883 479.0 474.0 5.0 P 411181 H11 2016-07-28T13:28:00 ... ZEP 2016 6 30 7 50 0 2016-06-30T07:50:00Z 2016.495427292046 2714-99 1897.97 0.91 78.9067 11.8883 479.0 474.0 5.0 P 411182 H11 2016-07-28T13:44:00 ... ZEP 2016 7 7 7 55 0 2016-07-07T07:55:00Z 2016.5145624620523 3529-99 1901.96 0.91 78.9067 11.8883 479.0 474.0 5.0 P 411372 H11 2016-08-02T09:19:00 ... ZEP 2016 7 7 7 55 0 2016-07-07T07:55:00Z 2016.5145624620523 3530-99 1902.43 0.91 78.9067 11.8883 479.0 474.0 5.0 P 411373 H11 2016-08-02T09:35:00 ... ZEP 2016 7 14 8 10 0 2016-07-14T08:10:00Z 2016.5337166059503 1277-99 1966.04 0.91 78.9067 11.8883 479.0 474.0 5.0 P 411374 H11 2016-08-01T15:14:00 .S. ZEP 2016 7 15 8 50 0 2016-07-15T08:50:00Z 2016.536524741955 1159-99 1957.17 0.91 78.9067 11.8883 479.0 474.0 5.0 P 411658 H11 2016-08-10T15:52:00 .S. ZEP 2016 7 15 8 50 0 2016-07-15T08:50:00Z 2016.536524741955 1160-99 1956.19 0.91 78.9067 11.8883 479.0 474.0 5.0 P 411659 H11 2016-08-10T16:08:00 .S. ZEP 2016 7 21 7 55 0 2016-07-21T07:55:00Z 2016.5528138281725 4533-99 1915.76 0.91 78.9067 11.8883 479.0 474.0 5.0 P 411656 H11 2016-08-10T15:20:00 ... ZEP 2016 7 21 7 55 0 2016-07-21T07:55:00Z 2016.5528138281725 4534-99 1917.07 0.91 78.9067 11.8883 479.0 474.0 5.0 P 411657 H11 2016-08-10T15:36:00 ... ZEP 2016 7 28 8 12 0 2016-07-28T08:12:00Z 2016.5719717668487 207-99 1900.43 0.91 78.9067 11.8883 479.0 474.0 5.0 P 412676 H11 2016-08-23T10:31:00 ... ZEP 2016 7 28 8 12 0 2016-07-28T08:12:00Z 2016.5719717668487 208-99 1901.18 0.91 78.9067 11.8883 479.0 474.0 5.0 P 412677 H11 2016-08-23T10:46:00 ... ZEP 2016 8 4 8 33 0 2016-08-04T08:33:00Z 2016.591137295082 5177-99 1900.54 0.91 78.9067 11.8883 479.0 474.0 5.0 P 412678 H11 2016-08-23T09:59:00 ... ZEP 2016 8 4 8 33 0 2016-08-04T08:33:00Z 2016.591137295082 5178-99 1900.67 0.91 78.9067 11.8883 479.0 474.0 5.0 P 412679 H11 2016-08-23T10:15:00 ... ZEP 2016 8 11 7 45 0 2016-08-11T07:45:00Z 2016.610171903461 89-99 1913.22 0.91 78.9067 11.8883 479.0 474.0 5.0 P 413636 H11 2016-09-09T16:21:00 ... ZEP 2016 8 11 7 45 0 2016-08-11T07:45:00Z 2016.610171903461 90-99 1914.53 0.91 78.9067 11.8883 479.0 474.0 5.0 P 413637 H11 2016-09-09T16:37:00 ... ZEP 2016 8 18 8 48 0 2016-08-18T08:48:00Z 2016.62941712204 1399-99 1910.28 0.91 78.9067 11.8883 479.0 474.0 5.0 P 413638 H11 2016-09-09T16:53:00 ... ZEP 2016 8 18 8 48 0 2016-08-18T08:48:00Z 2016.62941712204 1400-99 1909.02 0.91 78.9067 11.8883 479.0 474.0 5.0 P 413639 H11 2016-09-09T17:09:00 ... ZEP 2016 8 25 8 30 0 2016-08-25T08:30:00Z 2016.6485086520947 3463-99 1916.88 0.91 78.9067 11.8883 479.0 474.0 5.0 P 414527 H11 2016-10-05T13:03:00 ... ZEP 2016 8 25 8 30 0 2016-08-25T08:30:00Z 2016.6485086520947 3464-99 1916.7 0.91 78.9067 11.8883 479.0 474.0 5.0 P 414528 H11 2016-10-05T13:18:00 ... ZEP 2016 9 1 8 0 0 2016-09-01T08:00:00Z 2016.667577413479 5613-99 1933.35 0.91 78.9067 11.8883 479.0 474.0 5.0 P 414529 H11 2016-10-05T15:41:00 ... ZEP 2016 9 1 8 0 0 2016-09-01T08:00:00Z 2016.667577413479 5614-99 1931.48 0.91 78.9067 11.8883 479.0 474.0 5.0 P 414530 H11 2016-10-05T15:57:00 ... ZEP 2016 9 8 8 15 0 2016-09-08T08:15:00Z 2016.686731557377 5699-99 1927.84 0.91 78.9067 11.8883 479.0 474.0 5.0 P 414532 H11 2016-10-05T15:09:00 ... ZEP 2016 9 8 8 15 0 2016-09-08T08:15:00Z 2016.686731557377 5700-99 1929.53 0.91 78.9067 11.8883 479.0 474.0 5.0 P 414531 H11 2016-10-05T15:25:00 ... ZEP 2016 9 15 12 25 0 2016-09-15T12:25:00Z 2016.7063315877353 2251-99 6.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 415158 H11 2016-10-14T16:02:00 M.. ZEP 2016 9 15 12 25 0 2016-09-15T12:25:00Z 2016.7063315877353 2251-99 1936.61 0.91 78.9067 11.8883 479.0 474.0 5.0 P 415158 H11 2016-10-17T12:37:00 ... ZEP 2016 9 15 12 25 0 2016-09-15T12:25:00Z 2016.7063315877353 2252-99 5.02 0.91 78.9067 11.8883 479.0 474.0 5.0 P 415159 H11 2016-10-14T16:18:00 M.. ZEP 2016 9 15 12 25 0 2016-09-15T12:25:00Z 2016.7063315877353 2252-99 1938.16 0.91 78.9067 11.8883 479.0 474.0 5.0 P 415159 H11 2016-10-17T14:12:00 ... ZEP 2016 9 22 7 45 0 2016-09-22T07:45:00Z 2016.7249260018216 5435-99 5.03 0.91 78.9067 11.8883 479.0 474.0 5.0 P 415156 H11 2016-10-14T16:34:00 M.. ZEP 2016 9 22 7 45 0 2016-09-22T07:45:00Z 2016.7249260018216 5435-99 1927.6 0.91 78.9067 11.8883 479.0 474.0 5.0 P 415156 H11 2016-10-17T14:28:00 ... ZEP 2016 9 22 7 45 0 2016-09-22T07:45:00Z 2016.7249260018216 5436-99 4.97 0.91 78.9067 11.8883 479.0 474.0 5.0 P 415157 H11 2016-10-14T16:50:00 M.. ZEP 2016 9 22 7 45 0 2016-09-22T07:45:00Z 2016.7249260018216 5436-99 1927.06 0.91 78.9067 11.8883 479.0 474.0 5.0 P 415157 H11 2016-10-17T12:53:00 ... ZEP 2016 9 29 8 0 0 2016-09-29T08:00:00Z 2016.7440801457194 5209-99 1927.64 0.91 78.9067 11.8883 479.0 474.0 5.0 P 416130 H11 2016-11-04T08:52:00 ... ZEP 2016 10 6 7 45 0 2016-10-06T07:45:00Z 2016.7631773679418 539-99 1923.65 0.91 78.9067 11.8883 479.0 474.0 5.0 P 416128 H11 2016-11-04T09:08:00 ... ZEP 2016 10 6 7 45 0 2016-10-06T07:45:00Z 2016.7631773679418 540-99 1922.21 0.91 78.9067 11.8883 479.0 474.0 5.0 P 416129 H11 2016-11-04T09:24:00 ... ZEP 2016 10 13 7 50 0 2016-10-13T07:50:00Z 2016.7823125379477 1667-99 1924.56 0.91 78.9067 11.8883 479.0 474.0 5.0 P 416619 H11 2016-11-16T11:46:00 ... ZEP 2016 10 13 7 50 0 2016-10-13T07:50:00Z 2016.7823125379477 1668-99 1924.76 0.91 78.9067 11.8883 479.0 474.0 5.0 P 416620 H11 2016-11-16T12:02:00 ... ZEP 2016 10 20 8 13 0 2016-10-20T08:13:00Z 2016.8014818609593 1625-99 1932.79 0.91 78.9067 11.8883 479.0 474.0 5.0 P 416573 H11 2016-11-15T13:19:00 ... ZEP 2016 10 20 8 13 0 2016-10-20T08:13:00Z 2016.8014818609593 1626-99 1933.36 0.91 78.9067 11.8883 479.0 474.0 5.0 P 416574 H11 2016-11-15T13:35:00 ... ZEP 2016 10 27 7 37 0 2016-10-27T07:37:00Z 2016.8205392380085 1851-99 1966.97 0.91 78.9067 11.8883 479.0 474.0 5.0 P 417105 H11 2016-11-28T10:43:00 .S. ZEP 2016 10 27 7 37 0 2016-10-27T07:37:00Z 2016.8205392380085 1852-99 1966.15 0.91 78.9067 11.8883 479.0 474.0 5.0 P 417106 H11 2016-11-28T10:59:00 .S. ZEP 2016 11 3 8 35 0 2016-11-03T08:35:00Z 2016.8397749696417 4419-99 1930.95 0.91 78.9067 11.8883 479.0 474.0 5.0 P 417107 H11 2016-11-28T11:15:00 ... ZEP 2016 11 3 8 35 0 2016-11-03T08:35:00Z 2016.8397749696417 4420-99 1930.19 0.91 78.9067 11.8883 479.0 474.0 5.0 P 417108 H11 2016-11-28T11:31:00 ... ZEP 2016 11 10 8 59 0 2016-11-10T08:59:00Z 2016.8589461900424 5117-99 1931.05 0.91 78.9067 11.8883 479.0 474.0 5.0 P 417689 H11 2016-12-09T09:02:00 ... ZEP 2016 11 10 8 59 0 2016-11-10T08:59:00Z 2016.8589461900424 5118-99 1931.36 0.91 78.9067 11.8883 479.0 474.0 5.0 P 417690 H11 2016-12-09T09:18:00 ... ZEP 2016 11 17 8 36 0 2016-11-17T08:36:00Z 2016.878028233151 747-99 1931.67 0.91 78.9067 11.8883 479.0 474.0 5.0 P 417691 H11 2016-12-09T09:34:00 ... ZEP 2016 11 17 8 36 0 2016-11-17T08:36:00Z 2016.878028233151 748-99 1933.52 0.91 78.9067 11.8883 479.0 474.0 5.0 P 417692 H11 2016-12-09T09:50:00 ... ZEP 2016 11 23 8 50 0 2016-11-23T08:50:00Z 2016.8944482392228 5294-99 1973.85 0.91 78.9067 11.8883 479.0 474.0 5.0 P 418430 H11 2016-12-29T10:26:00 .S. ZEP 2016 12 1 9 39 0 2016-12-01T09:39:00Z 2016.9163991347905 5403-99 1955.89 0.91 78.9067 11.8883 479.0 474.0 5.0 P 418431 H11 2016-12-27T13:52:00 ... ZEP 2016 12 1 9 39 0 2016-12-01T09:39:00Z 2016.9163991347905 5404-99 1955.99 0.91 78.9067 11.8883 479.0 474.0 5.0 P 418432 H11 2016-12-27T14:07:00 ... ZEP 2016 12 8 8 57 0 2016-12-08T08:57:00Z 2016.9354451275046 3795-99 1944.29 0.91 78.9067 11.8883 479.0 474.0 5.0 P 419571 H11 2017-01-27T16:26:00 ... ZEP 2016 12 8 8 57 0 2016-12-08T08:57:00Z 2016.9354451275046 3796-99 1945.02 0.91 78.9067 11.8883 479.0 474.0 5.0 P 419572 H11 2017-01-27T16:42:00 ... ZEP 2016 12 15 8 32 0 2016-12-15T08:32:00Z 2016.954523375835 2713-99 1939.22 0.91 78.9067 11.8883 479.0 474.0 5.0 P 419567 H11 2017-01-27T15:55:00 ... ZEP 2016 12 15 8 32 0 2016-12-15T08:32:00Z 2016.954523375835 2714-99 1939.78 0.91 78.9067 11.8883 479.0 474.0 5.0 P 419568 H11 2017-01-27T16:10:00 ... ZEP 2016 12 22 9 45 0 2016-12-22T09:45:00Z 2016.973787568306 3357-99 1940.5 0.91 78.9067 11.8883 479.0 474.0 5.0 P 419569 H11 2017-01-30T10:15:00 ... ZEP 2016 12 22 9 45 0 2016-12-22T09:45:00Z 2016.973787568306 3358-99 1939.46 0.91 78.9067 11.8883 479.0 474.0 5.0 P 419570 H11 2017-01-30T10:30:00 ... ZEP 2016 12 30 14 0 0 2016-12-30T14:00:00Z 2016.9961293260474 3831-99 1969.26 0.91 78.9067 11.8883 479.0 474.0 5.0 P 419565 H11 2017-01-27T16:58:00 .S. ZEP 2016 12 30 14 0 0 2016-12-30T14:00:00Z 2016.9961293260474 3832-99 1968.77 0.91 78.9067 11.8883 479.0 474.0 5.0 P 419566 H11 2017-01-27T17:14:00 .S. ZEP 2017 1 5 9 40 0 2017-01-05T09:40:00Z 2017.0120624048707 3195-99 1937.25 0.91 78.9067 11.8883 479.0 474.0 5.0 P 420163 H11 2017-02-09T10:36:00 ... ZEP 2017 1 5 9 40 0 2017-01-05T09:40:00Z 2017.0120624048707 3196-99 1938.24 0.91 78.9067 11.8883 479.0 474.0 5.0 P 420164 H11 2017-02-09T10:51:00 ... ZEP 2017 1 12 9 0 0 2017-01-12T09:00:00Z 2017.0311643835616 5593-99 1956.55 0.91 78.9067 11.8883 479.0 474.0 5.0 P 420161 H11 2017-02-08T12:54:00 ... ZEP 2017 1 12 9 0 0 2017-01-12T09:00:00Z 2017.0311643835616 5594-99 1955.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 420162 H11 2017-02-08T13:10:00 ... ZEP 2017 1 19 8 45 0 2017-01-19T08:45:00Z 2017.0503139269406 5361-99 1953.49 0.91 78.9067 11.8883 479.0 474.0 5.0 P 421115 H11 2017-02-24T12:15:00 ... ZEP 2017 1 19 8 45 0 2017-01-19T08:45:00Z 2017.0503139269406 5362-99 1953.51 0.91 78.9067 11.8883 479.0 474.0 5.0 P 421116 H11 2017-02-24T12:31:00 ... ZEP 2017 1 26 10 15 0 2017-01-26T10:15:00Z 2017.069663242009 5681-99 1970.1 0.91 78.9067 11.8883 479.0 474.0 5.0 P 421113 H11 2017-02-24T11:44:00 .S. ZEP 2017 1 26 10 15 0 2017-01-26T10:15:00Z 2017.069663242009 5682-99 1969.31 0.91 78.9067 11.8883 479.0 474.0 5.0 P 421114 H11 2017-02-24T11:59:00 .S. ZEP 2017 2 2 8 50 0 2017-02-02T08:50:00Z 2017.0886796042619 1539-99 1952.72 0.91 78.9067 11.8883 479.0 474.0 5.0 P 421574 H11 2017-03-06T12:00:00 ... ZEP 2017 2 2 8 50 0 2017-02-02T08:50:00Z 2017.0886796042619 1540-99 1952.9 0.91 78.9067 11.8883 479.0 474.0 5.0 P 421575 H11 2017-03-06T12:16:00 ... ZEP 2017 2 9 9 8 0 2017-02-09T09:08:00Z 2017.107891933029 4061-99 1973.31 0.91 78.9067 11.8883 479.0 474.0 5.0 P 421576 H11 2017-03-06T11:29:00 .S. ZEP 2017 2 9 9 8 0 2017-02-09T09:08:00Z 2017.107891933029 4062-99 1975.15 0.91 78.9067 11.8883 479.0 474.0 5.0 P 421577 H11 2017-03-06T11:45:00 .S. ZEP 2017 2 16 8 34 0 2017-02-16T08:34:00Z 2017.1270053272451 5081-99 1945.14 0.91 78.9067 11.8883 479.0 474.0 5.0 P 422584 H11 2017-03-24T13:44:00 ... ZEP 2017 2 16 8 34 0 2017-02-16T08:34:00Z 2017.1270053272451 5082-99 1947.21 0.91 78.9067 11.8883 479.0 474.0 5.0 P 422585 H11 2017-03-24T13:59:00 ... ZEP 2017 2 23 9 14 0 2017-02-23T09:14:00Z 2017.1462595129376 159-99 1974.95 0.91 78.9067 11.8883 479.0 474.0 5.0 P 422582 H11 2017-03-24T14:15:00 .S. ZEP 2017 2 23 9 14 0 2017-02-23T09:14:00Z 2017.1462595129376 160-99 1973.22 0.91 78.9067 11.8883 479.0 474.0 5.0 P 422583 H11 2017-03-24T14:31:00 .S. ZEP 2017 3 2 9 7 0 2017-03-02T09:07:00Z 2017.1654242770167 5427-99 1945.17 0.91 78.9067 11.8883 479.0 474.0 5.0 P 423331 H11 2017-04-06T17:24:00 ... ZEP 2017 3 2 9 7 0 2017-03-02T09:07:00Z 2017.1654242770167 5428-99 1944.79 0.91 78.9067 11.8883 479.0 474.0 5.0 P 423332 H11 2017-04-06T17:40:00 ... ZEP 2017 3 9 8 29 0 2017-03-09T08:29:00Z 2017.1845300608827 4557-99 1943.29 0.91 78.9067 11.8883 479.0 474.0 5.0 P 423329 H11 2017-04-06T16:52:00 ... ZEP 2017 3 9 8 29 0 2017-03-09T08:29:00Z 2017.1845300608827 4558-99 1943.17 0.91 78.9067 11.8883 479.0 474.0 5.0 P 423330 H11 2017-04-06T17:08:00 ... ZEP 2017 3 16 8 54 0 2017-03-16T08:54:00Z 2017.2037557077626 4701-99 1955.5 0.91 78.9067 11.8883 479.0 474.0 5.0 P 424958 H11 2017-05-11T10:31:00 ... ZEP 2017 3 16 8 54 0 2017-03-16T08:54:00Z 2017.2037557077626 4702-99 1956.71 0.91 78.9067 11.8883 479.0 474.0 5.0 P 424959 H11 2017-05-11T10:47:00 ... ZEP 2017 3 23 8 41 0 2017-03-23T08:41:00Z 2017.2229090563167 4085-99 1960.72 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425288 H11 2017-05-15T16:31:00 ... ZEP 2017 3 23 8 41 0 2017-03-23T08:41:00Z 2017.2229090563167 4086-99 1960.61 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425289 H11 2017-05-15T16:47:00 ... ZEP 2017 3 30 7 50 0 2017-03-30T07:50:00Z 2017.2419901065448 5477-99 1948.92 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425859 H11 2017-05-31T12:23:00 ... ZEP 2017 3 30 7 50 0 2017-03-30T07:50:00Z 2017.2419901065448 5478-99 1950.39 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425860 H11 2017-05-31T12:38:00 ... ZEP 2017 4 6 7 55 0 2017-04-06T07:55:00Z 2017.2611777016743 2737-99 1959.94 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425857 H11 2017-05-31T12:54:00 ... ZEP 2017 4 6 7 55 0 2017-04-06T07:55:00Z 2017.2611777016743 2738-99 1959.66 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425858 H11 2017-05-31T13:10:00 ... ZEP 2017 4 13 7 33 0 2017-04-13T07:33:00Z 2017.2803139269406 5707-99 1944.97 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425823 H11 2017-05-30T14:24:00 ... ZEP 2017 4 13 7 33 0 2017-04-13T07:33:00Z 2017.2803139269406 5708-99 1946.72 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425824 H11 2017-05-30T14:40:00 ... ZEP 2017 4 20 8 9 0 2017-04-20T08:09:00Z 2017.2995605022832 5431-99 1942.41 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425861 H11 2017-05-31T13:26:00 ... ZEP 2017 4 20 8 9 0 2017-04-20T08:09:00Z 2017.2995605022832 5432-99 1942.77 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425862 H11 2017-05-31T13:42:00 ... ZEP 2017 4 27 7 55 0 2017-04-27T07:55:00Z 2017.3187119482495 4197-99 1933.79 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425855 H11 2017-05-31T11:51:00 ... ZEP 2017 4 27 7 55 0 2017-04-27T07:55:00Z 2017.3187119482495 4198-99 1934.11 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425856 H11 2017-05-31T12:07:00 ... ZEP 2017 5 4 7 57 0 2017-05-04T07:57:00Z 2017.3378938356163 3135-99 1932.09 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425853 H11 2017-05-31T11:19:00 ... ZEP 2017 5 4 7 57 0 2017-05-04T07:57:00Z 2017.3378938356163 3136-99 1931.78 0.91 78.9067 11.8883 479.0 474.0 5.0 P 425854 H11 2017-05-31T11:35:00 ... ZEP 2017 5 11 7 36 0 2017-05-11T07:36:00Z 2017.3570319634703 5341-99 1930.52 0.91 78.9067 11.8883 479.0 474.0 5.0 P 426386 H11 2017-06-12T15:52:00 ... ZEP 2017 5 11 7 36 0 2017-05-11T07:36:00Z 2017.3570319634703 5342-99 1930.78 0.91 78.9067 11.8883 479.0 474.0 5.0 P 426387 H11 2017-06-12T16:08:00 ... ZEP 2017 5 18 7 45 0 2017-05-18T07:45:00Z 2017.3762271689498 1261-99 1927.37 0.91 78.9067 11.8883 479.0 474.0 5.0 P 426388 H11 2017-06-12T14:48:00 ... ZEP 2017 5 18 7 45 0 2017-05-18T07:45:00Z 2017.3762271689498 1262-99 1928.37 0.91 78.9067 11.8883 479.0 474.0 5.0 P 426389 H11 2017-06-12T15:03:00 ... ZEP 2017 5 25 7 35 0 2017-05-25T07:35:00Z 2017.3953862252663 3099-99 1924.1 0.91 78.9067 11.8883 479.0 474.0 5.0 P 427117 H11 2017-06-22T09:07:00 ... ZEP 2017 5 25 7 35 0 2017-05-25T07:35:00Z 2017.3953862252663 3100-99 1926.63 0.91 78.9067 11.8883 479.0 474.0 5.0 P 427118 H11 2017-06-22T09:23:00 ... ZEP 2017 6 1 8 42 0 2017-06-01T08:42:00Z 2017.4146917808218 2065-99 1920.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 427119 H11 2017-06-22T09:38:00 ... ZEP 2017 6 1 8 42 0 2017-06-01T08:42:00Z 2017.4146917808218 2066-99 1920.48 0.91 78.9067 11.8883 479.0 474.0 5.0 P 427120 H11 2017-06-22T09:54:00 ... ZEP 2017 6 8 7 26 0 2017-06-08T07:26:00Z 2017.4337252663622 5531-99 1934.76 0.91 78.9067 11.8883 479.0 474.0 5.0 P 427815 H11 2017-07-18T13:42:00 ... ZEP 2017 6 8 7 26 0 2017-06-08T07:26:00Z 2017.4337252663622 5532-99 1935.38 0.91 78.9067 11.8883 479.0 474.0 5.0 P 427816 H11 2017-07-18T13:57:00 ... ZEP 2017 6 15 7 38 0 2017-06-15T07:38:00Z 2017.4529261796042 5155-99 1914.98 0.91 78.9067 11.8883 479.0 474.0 5.0 P 427817 H11 2017-07-18T13:10:00 ... ZEP 2017 6 15 7 38 0 2017-06-15T07:38:00Z 2017.4529261796042 5156-99 1915.77 0.91 78.9067 11.8883 479.0 474.0 5.0 P 427818 H11 2017-07-18T13:26:00 ... ZEP 2017 6 22 8 23 0 2017-06-22T08:23:00Z 2017.4721898782343 5591-99 1908.21 0.91 78.9067 11.8883 479.0 474.0 5.0 P 428178 H11 2017-07-24T15:04:00 ... ZEP 2017 6 22 8 23 0 2017-06-22T08:23:00Z 2017.4721898782343 5592-99 1909.46 0.91 78.9067 11.8883 479.0 474.0 5.0 P 428179 H11 2017-07-24T15:19:00 ... ZEP 2017 6 29 7 53 0 2017-06-29T07:53:00Z 2017.4913108828007 4959-99 1910.27 0.91 78.9067 11.8883 479.0 474.0 5.0 P 428166 H11 2017-07-25T16:10:00 ... ZEP 2017 6 29 7 53 0 2017-06-29T07:53:00Z 2017.4913108828007 4960-99 1909.98 0.91 78.9067 11.8883 479.0 474.0 5.0 P 428167 H11 2017-07-25T16:26:00 ... ZEP 2017 7 6 7 36 0 2017-07-06T07:36:00Z 2017.5104566210046 2885-99 1906.63 0.91 78.9067 11.8883 479.0 474.0 5.0 P 428738 H11 2017-08-04T15:31:00 ... ZEP 2017 7 6 7 36 0 2017-07-06T07:36:00Z 2017.5104566210046 2886-99 1905.49 0.91 78.9067 11.8883 479.0 474.0 5.0 P 428739 H11 2017-08-04T15:47:00 ... ZEP 2017 7 13 7 50 0 2017-07-13T07:50:00Z 2017.5296613394216 125-99 1905.51 0.91 78.9067 11.8883 479.0 474.0 5.0 P 428736 H11 2017-08-04T14:59:00 ... ZEP 2017 7 13 7 50 0 2017-07-13T07:50:00Z 2017.5296613394216 126-99 1906.04 0.91 78.9067 11.8883 479.0 474.0 5.0 P 428737 H11 2017-08-04T15:15:00 ... ZEP 2017 7 20 8 44 0 2017-07-20T08:44:00Z 2017.5489421613395 1083-99 1905.31 0.91 78.9067 11.8883 479.0 474.0 5.0 P 429459 H11 2017-08-21T16:50:00 ... ZEP 2017 7 20 8 44 0 2017-07-20T08:44:00Z 2017.5489421613395 1084-99 1904.67 0.91 78.9067 11.8883 479.0 474.0 5.0 P 429460 H11 2017-08-21T17:06:00 ... ZEP 2017 7 27 12 34 56 2017-07-27T12:34:56Z 2017.568559614409 4931-99 1906.81 0.91 78.9067 11.8883 479.0 474.0 5.0 P 429457 H11 2017-08-21T16:34:00 ... ZEP 2017 7 27 12 34 56 2017-07-27T12:34:56Z 2017.568559614409 4932-99 1906.56 0.91 78.9067 11.8883 479.0 474.0 5.0 P 429458 H11 2017-08-21T16:18:00 ... ZEP 2017 8 3 7 32 0 2017-08-03T07:32:00Z 2017.5871613394215 3927-99 1904.98 0.91 78.9067 11.8883 479.0 474.0 5.0 P 430057 H11 2017-09-08T12:20:00 ... ZEP 2017 8 3 7 32 0 2017-08-03T07:32:00Z 2017.5871613394215 3928-99 1904.82 0.91 78.9067 11.8883 479.0 474.0 5.0 P 430058 H11 2017-09-08T12:35:00 ... ZEP 2017 8 10 7 39 0 2017-08-10T07:39:00Z 2017.606352739726 1203-99 1910.84 0.91 78.9067 11.8883 479.0 474.0 5.0 P 430059 H11 2017-09-08T12:51:00 ... ZEP 2017 8 10 7 39 0 2017-08-10T07:39:00Z 2017.606352739726 1204-99 1911.63 0.91 78.9067 11.8883 479.0 474.0 5.0 P 430060 H11 2017-09-08T13:07:00 ... ZEP 2017 8 17 12 4 0 2017-08-17T12:04:00Z 2017.6260350076104 1823-99 1910.91 0.91 78.9067 11.8883 479.0 474.0 5.0 P 430774 H11 2017-09-19T12:05:00 ... ZEP 2017 8 17 12 4 0 2017-08-17T12:04:00Z 2017.6260350076104 1824-99 1910.74 0.91 78.9067 11.8883 479.0 474.0 5.0 P 430773 H11 2017-09-19T12:21:00 ... ZEP 2017 8 24 7 31 0 2017-08-24T07:31:00Z 2017.6446936834095 4477-99 1911.32 0.91 78.9067 11.8883 479.0 474.0 5.0 P 430771 H11 2017-09-19T12:37:00 ... ZEP 2017 8 24 7 31 0 2017-08-24T07:31:00Z 2017.6446936834095 4478-99 1911.08 0.91 78.9067 11.8883 479.0 474.0 5.0 P 430772 H11 2017-09-19T12:53:00 ... ZEP 2017 8 31 7 45 0 2017-08-31T07:45:00Z 2017.6638984018264 5297-99 1919.7 0.91 78.9067 11.8883 479.0 474.0 5.0 P 431633 H11 2017-10-02T14:30:00 ... ZEP 2017 8 31 7 45 0 2017-08-31T07:45:00Z 2017.6638984018264 5298-99 1919.74 0.91 78.9067 11.8883 479.0 474.0 5.0 P 431634 H11 2017-10-02T14:46:00 ... ZEP 2017 9 7 7 35 0 2017-09-07T07:35:00Z 2017.6830574581431 3577-99 1929.69 0.91 78.9067 11.8883 479.0 474.0 5.0 P 431631 H11 2017-10-02T13:59:00 ... ZEP 2017 9 7 7 35 0 2017-09-07T07:35:00Z 2017.6830574581431 3578-99 1929.75 0.91 78.9067 11.8883 479.0 474.0 5.0 P 431632 H11 2017-10-02T14:14:00 ... ZEP 2017 9 14 12 34 56 2017-09-14T12:34:56Z 2017.7028061897513 3551-99 1964.32 0.91 78.9067 11.8883 479.0 474.0 5.0 P 432589 H11 2017-10-18T16:30:00 ... ZEP 2017 9 14 12 34 56 2017-09-14T12:34:56Z 2017.7028061897513 3552-99 1964.02 0.91 78.9067 11.8883 479.0 474.0 5.0 P 432590 H11 2017-10-18T16:46:00 ... ZEP 2017 9 21 8 38 0 2017-09-21T08:38:00Z 2017.7215334855402 5559-99 1936.61 0.91 78.9067 11.8883 479.0 474.0 5.0 P 432503 H11 2017-10-18T12:45:00 ... ZEP 2017 9 21 8 38 0 2017-09-21T08:38:00Z 2017.7215334855402 5560-99 1934.98 0.91 78.9067 11.8883 479.0 474.0 5.0 P 432504 H11 2017-10-18T13:01:00 ... ZEP 2017 9 28 8 40 0 2017-09-28T08:40:00Z 2017.740715372907 603-99 1998.0 0.91 78.9067 11.8883 479.0 474.0 5.0 P 433325 H11 2017-11-03T08:57:00 .S. ZEP 2017 9 28 8 40 0 2017-09-28T08:40:00Z 2017.740715372907 604-99 1997.4 0.91 78.9067 11.8883 479.0 474.0 5.0 P 433326 H11 2017-11-03T09:12:00 .S. ZEP 2017 10 5 8 32 0 2017-10-05T08:32:00Z 2017.7598782343987 5773-99 1939.19 0.91 78.9067 11.8883 479.0 474.0 5.0 P 433329 H11 2017-11-03T08:25:00 ... ZEP 2017 10 5 8 32 0 2017-10-05T08:32:00Z 2017.7598782343987 5774-99 1939.63 0.91 78.9067 11.8883 479.0 474.0 5.0 P 433330 H11 2017-11-03T08:41:00 ... ZEP 2017 10 12 8 12 0 2017-10-12T08:12:00Z 2017.7790182648403 1843-99 1935.21 0.91 78.9067 11.8883 479.0 474.0 5.0 P 433817 H11 2017-11-09T09:51:00 ... ZEP 2017 10 12 8 12 0 2017-10-12T08:12:00Z 2017.7790182648403 1844-99 1937.59 0.91 78.9067 11.8883 479.0 474.0 5.0 P 433818 H11 2017-11-09T10:07:00 ... ZEP 2017 10 19 7 40 0 2017-10-19T07:40:00Z 2017.7981354642313 5563-99 1950.68 0.91 78.9067 11.8883 479.0 474.0 5.0 P 433819 H11 2017-11-09T08:48:00 ... ZEP 2017 10 19 7 40 0 2017-10-19T07:40:00Z 2017.7981354642313 5564-99 1950.81 0.91 78.9067 11.8883 479.0 474.0 5.0 P 433820 H11 2017-11-09T09:04:00 ... ZEP 2017 10 26 7 25 0 2017-10-26T07:25:00Z 2017.8172850076103 3143-99 1936.37 0.91 78.9067 11.8883 479.0 474.0 5.0 P 434871 H11 2017-12-01T10:05:00 ... ZEP 2017 10 26 7 25 0 2017-10-26T07:25:00Z 2017.8172850076103 3144-99 1934.41 0.91 78.9067 11.8883 479.0 474.0 5.0 P 434872 H11 2017-12-01T10:21:00 ... ZEP 2017 11 2 8 36 0 2017-11-02T08:36:00Z 2017.836598173516 5775-99 1949.01 0.91 78.9067 11.8883 479.0 474.0 5.0 P 434873 H11 2017-12-01T09:33:00 ... ZEP 2017 11 2 8 36 0 2017-11-02T08:36:00Z 2017.836598173516 5776-99 1950.67 0.91 78.9067 11.8883 479.0 474.0 5.0 P 434874 H11 2017-12-01T09:49:00 ... ZEP 2017 11 10 14 11 0 2017-11-10T14:11:00Z 2017.859153348554 5007-99 1956.59 0.91 78.9067 11.8883 479.0 474.0 5.0 P 435436 H11 2017-12-12T15:42:00 ... ZEP 2017 11 10 14 11 0 2017-11-10T14:11:00Z 2017.859153348554 5008-99 1955.82 0.91 78.9067 11.8883 479.0 474.0 5.0 P 435437 H11 2017-12-12T15:58:00 ... ZEP 2017 11 16 8 40 0 2017-11-16T08:40:00Z 2017.8749619482496 4061-99 1975.52 0.91 78.9067 11.8883 479.0 474.0 5.0 P 435438 H11 2017-12-12T15:10:00 .S. ZEP 2017 11 16 8 40 0 2017-11-16T08:40:00Z 2017.8749619482496 4062-99 1975.22 0.91 78.9067 11.8883 479.0 474.0 5.0 P 435439 H11 2017-12-12T15:26:00 .S. ZEP 2017 11 23 8 35 0 2017-11-23T08:35:00Z 2017.8941305175038 4089-99 1972.63 0.91 78.9067 11.8883 479.0 474.0 5.0 P 435400 H11 2017-12-13T15:03:00 .S. ZEP 2017 11 23 8 35 0 2017-11-23T08:35:00Z 2017.8941305175038 4090-99 1972.93 0.91 78.9067 11.8883 479.0 474.0 5.0 P 435401 H11 2017-12-13T15:19:00 .S. ZEP 2017 11 30 8 45 0 2017-11-30T08:45:00Z 2017.9133276255707 3691-99 1941.76 0.91 78.9067 11.8883 479.0 474.0 5.0 P 437914 H11 2018-02-07T16:24:00 ... ZEP 2017 11 30 8 45 0 2017-11-30T08:45:00Z 2017.9133276255707 3692-99 1942.36 0.91 78.9067 11.8883 479.0 474.0 5.0 P 437915 H11 2018-02-07T16:40:00 ... ZEP 2017 12 7 8 53 0 2017-12-07T08:53:00Z 2017.9325209284627 103-99 1944.79 0.91 78.9067 11.8883 479.0 474.0 5.0 P 437916 H11 2018-02-07T16:56:00 ... ZEP 2017 12 7 8 53 0 2017-12-07T08:53:00Z 2017.9325209284627 104-99 1944.18 0.91 78.9067 11.8883 479.0 474.0 5.0 P 437917 H11 2018-02-07T17:12:00 ... ZEP 2017 12 14 8 57 0 2017-12-14T08:57:00Z 2017.9517066210046 4245-99 1977.47 0.91 78.9067 11.8883 479.0 474.0 5.0 P 437698 H11 2018-02-07T12:42:00 .S. ZEP 2017 12 14 8 57 0 2017-12-14T08:57:00Z 2017.9517066210046 4246-99 1976.35 0.91 78.9067 11.8883 479.0 474.0 5.0 P 437699 H11 2018-02-07T12:58:00 .S. ZEP 2017 12 21 8 40 0 2017-12-21T08:40:00Z 2017.9708523592085 3187-99 1945.8 0.91 78.9067 11.8883 479.0 474.0 5.0 P 437700 H11 2018-02-07T13:14:00 ... ZEP 2017 12 21 8 40 0 2017-12-21T08:40:00Z 2017.9708523592085 3188-99 1947.12 0.91 78.9067 11.8883 479.0 474.0 5.0 P 437701 H11 2018-02-07T13:30:00 ... ZEP 2017 12 28 8 5 0 2017-12-28T08:05:00Z 2017.989963850837 5109-99 1941.21 0.91 78.9067 11.8883 479.0 474.0 5.0 P 437702 H11 2018-02-07T14:02:00 ... ZEP 2018 1 4 8 59 0 2018-01-04T08:59:00Z 2018.009244672755 5654-99 1950.85 0.91 78.9067 11.8883 479.0 474.0 5.0 P 437703 H11 2018-02-07T13:46:00 ... ZEP 2018 1 4 10 45 0 2018-01-04T10:45:00Z 2018.009446347032 5621-99 1949.75 0.91 78.9067 11.8883 479.0 474.0 5.0 P 437918 H11 2018-02-08T09:18:00 ... ZEP 2018 1 4 10 45 0 2018-01-04T10:45:00Z 2018.009446347032 5622-99 1950.49 0.91 78.9067 11.8883 479.0 474.0 5.0 P 437919 H11 2018-02-08T09:34:00 ... ZEP 2018 1 11 8 37 0 2018-01-11T08:37:00Z 2018.0283808980214 3551-99 1938.5 0.91 78.9067 11.8883 479.0 474.0 5.0 P 438223 H11 2018-02-13T09:01:00 ... ZEP 2018 1 11 8 37 0 2018-01-11T08:37:00Z 2018.0283808980214 3552-99 1938.36 0.91 78.9067 11.8883 479.0 474.0 5.0 P 438224 H11 2018-02-13T09:17:00 ... ZEP 2018 1 18 9 12 0 2018-01-18T09:12:00Z 2018.0476255707763 4855-99 1935.91 0.91 78.9067 11.8883 479.0 474.0 5.0 P 438219 H11 2018-02-20T13:44:00 ... ZEP 2018 1 18 9 12 0 2018-01-18T09:12:00Z 2018.0476255707763 4856-99 1937.04 0.91 78.9067 11.8883 479.0 474.0 5.0 P 438220 H11 2018-02-20T14:00:00 ... ZEP 2018 1 25 8 16 0 2018-01-25T08:16:00Z 2018.066697108067 1667-99 1957.97 0.91 78.9067 11.8883 479.0 474.0 5.0 P 438950 H11 2018-03-01T10:30:00 ... ZEP 2018 1 25 8 16 0 2018-01-25T08:16:00Z 2018.066697108067 1668-99 1958.67 0.91 78.9067 11.8883 479.0 474.0 5.0 P 438951 H11 2018-03-01T10:46:00 ... ZEP 2018 2 1 8 50 0 2018-02-01T08:50:00Z 2018.0859398782345 2669-99 1944.07 0.91 78.9067 11.8883 479.0 474.0 5.0 P 438952 H11 2018-03-01T09:58:00 ... ZEP 2018 2 1 8 50 0 2018-02-01T08:50:00Z 2018.0859398782345 2670-99 1944.89 0.91 78.9067 11.8883 479.0 474.0 5.0 P 438953 H11 2018-03-01T10:14:00 ... ZEP 2018 2 15 8 45 0 2018-02-15T08:45:00Z 2018.1242865296804 1641-99 1943.0 0.91 78.9067 11.8883 479.0 474.0 5.0 P 440094 H11 2018-03-16T10:48:00 ... ZEP 2018 2 15 8 45 0 2018-02-15T08:45:00Z 2018.1242865296804 260-99 1942.42 0.91 78.9067 11.8883 479.0 474.0 5.0 P 440095 H11 2018-03-16T11:04:00 ... ZEP 2018 2 22 8 37 0 2018-02-22T08:37:00Z 2018.143449391172 2355-99 1949.26 0.91 78.9067 11.8883 479.0 474.0 5.0 P 440092 H11 2018-03-16T10:16:00 ... ZEP 2018 2 22 8 37 0 2018-02-22T08:37:00Z 2018.143449391172 2356-99 1948.01 0.91 78.9067 11.8883 479.0 474.0 5.0 P 440093 H11 2018-03-16T10:32:00 ... ZEP 2018 3 1 8 33 0 2018-03-01T08:33:00Z 2018.1626198630138 3819-99 1949.95 0.91 78.9067 11.8883 479.0 474.0 5.0 P 441383 H11 2018-04-13T12:35:00 ... ZEP 2018 3 1 8 33 0 2018-03-01T08:33:00Z 2018.1626198630138 3820-99 1949.97 0.91 78.9067 11.8883 479.0 474.0 5.0 P 441384 H11 2018-04-13T12:51:00 ... ZEP 2018 3 8 10 15 0 2018-03-08T10:15:00Z 2018.1819920091325 261-99 1940.77 0.91 78.9067 11.8883 479.0 474.0 5.0 P 441387 H11 2018-04-16T14:57:00 ... ZEP 2018 3 8 10 15 0 2018-03-08T10:15:00Z 2018.1819920091325 262-99 1939.65 0.91 78.9067 11.8883 479.0 474.0 5.0 P 441388 H11 2018-04-16T15:13:00 ... ZEP 2018 3 15 8 47 0 2018-03-15T08:47:00Z 2018.2010026636226 1527-99 1941.93 0.91 78.9067 11.8883 479.0 474.0 5.0 P 441381 H11 2018-04-13T13:07:00 ... ZEP 2018 3 15 8 47 0 2018-03-15T08:47:00Z 2018.2010026636226 1528-99 1942.76 0.91 78.9067 11.8883 479.0 474.0 5.0 P 441382 H11 2018-04-13T13:23:00 ... ZEP 2018 3 22 7 0 0 2018-03-22T07:00:00Z 2018.2199771689498 1349-99 1937.77 0.91 78.9067 11.8883 479.0 474.0 5.0 P 441960 H11 2018-04-24T11:11:00 ... ZEP 2018 3 22 7 0 0 2018-03-22T07:00:00Z 2018.2199771689498 1350-99 1939.19 0.91 78.9067 11.8883 479.0 474.0 5.0 P 441961 H11 2018-04-24T11:27:00 ... ZEP 2018 3 29 7 20 0 2018-03-29T07:20:00Z 2018.2391933028919 199-99 1948.81 0.91 78.9067 11.8883 479.0 474.0 5.0 P 441958 H11 2018-04-24T10:39:00 ... ZEP 2018 3 29 7 20 0 2018-03-29T07:20:00Z 2018.2391933028919 200-99 1948.07 0.91 78.9067 11.8883 479.0 474.0 5.0 P 441959 H11 2018-04-24T10:55:00 ... ZEP 2018 4 5 7 52 0 2018-04-05T07:52:00Z 2018.2584322678842 1943-99 1957.96 0.91 78.9067 11.8883 479.0 474.0 5.0 P 442884 H11 2018-05-09T13:51:00 ... ZEP 2018 4 5 7 52 0 2018-04-05T07:52:00Z 2018.2584322678842 1944-99 1957.97 0.91 78.9067 11.8883 479.0 474.0 5.0 P 442885 H11 2018-05-09T14:06:00 ... ZEP 2018 4 12 7 55 0 2018-04-12T07:55:00Z 2018.2776160578387 5469-99 1943.16 0.91 78.9067 11.8883 479.0 474.0 5.0 P 442882 H11 2018-05-09T13:19:00 ... ZEP 2018 4 12 7 55 0 2018-04-12T07:55:00Z 2018.2776160578387 5470-99 1942.88 0.91 78.9067 11.8883 479.0 474.0 5.0 P 442883 H11 2018-05-09T13:35:00 ... ZEP 2018 4 19 12 25 0 2018-04-19T12:25:00Z 2018.2973078386606 4853-99 1947.44 0.91 78.9067 11.8883 479.0 474.0 5.0 P 444043 H11 2018-05-25T12:10:00 ... ZEP 2018 4 19 12 25 0 2018-04-19T12:25:00Z 2018.2973078386606 4942-99 1947.51 0.91 78.9067 11.8883 479.0 474.0 5.0 P 444044 H11 2018-05-25T12:26:00 ... ZEP 2018 4 26 9 29 0 2018-04-26T09:29:00Z 2018.316151065449 4364-99 1948.76 0.91 78.9067 11.8883 479.0 474.0 5.0 P 444041 H11 2018-05-25T11:54:00 ... ZEP 2018 4 26 9 29 0 2018-04-26T09:29:00Z 2018.316151065449 5317-99 1948.14 0.91 78.9067 11.8883 479.0 474.0 5.0 P 444042 H11 2018-05-25T11:38:00 ... ZEP 2018 5 3 8 3 0 2018-05-03T08:03:00Z 2018.3351655251142 5369-99 1939.39 0.91 78.9067 11.8883 479.0 474.0 5.0 P 446061 H11 2018-07-09T11:29:00 ... ZEP 2018 5 3 8 3 0 2018-05-03T08:03:00Z 2018.3351655251142 5370-99 1940.36 0.91 78.9067 11.8883 479.0 474.0 5.0 P 446062 H11 2018-07-09T11:44:00 ... ZEP 2018 5 10 7 10 0 2018-05-10T07:10:00Z 2018.3542427701675 159-99 1935.66 0.91 78.9067 11.8883 479.0 474.0 5.0 P 446059 H11 2018-07-09T10:57:00 ... ZEP 2018 5 10 7 10 0 2018-05-10T07:10:00Z 2018.3542427701675 160-99 1935.57 0.91 78.9067 11.8883 479.0 474.0 5.0 P 446060 H11 2018-07-09T11:13:00 ... ZEP 2018 5 17 7 33 0 2018-05-17T07:33:00Z 2018.3734646118721 5641-99 1933.58 0.91 78.9067 11.8883 479.0 474.0 5.0 P 445506 H11 2018-06-25T14:38:00 ... ZEP 2018 5 17 7 33 0 2018-05-17T07:33:00Z 2018.3734646118721 5642-99 1932.21 0.91 78.9067 11.8883 479.0 474.0 5.0 P 445507 H11 2018-06-25T14:54:00 ... ZEP 2018 5 24 7 22 0 2018-05-24T07:22:00Z 2018.3926217656012 4089-99 1930.85 0.91 78.9067 11.8883 479.0 474.0 5.0 P 445504 H11 2018-06-25T15:10:00 ... ZEP 2018 5 24 7 22 0 2018-05-24T07:22:00Z 2018.3926217656012 4090-99 1931.62 0.91 78.9067 11.8883 479.0 474.0 5.0 P 445505 H11 2018-06-25T15:26:00 ... ZEP 2018 5 31 6 35 0 2018-05-31T06:35:00Z 2018.4117104261795 2093-99 1926.84 0.91 78.9067 11.8883 479.0 474.0 5.0 P 446057 H11 2018-07-09T15:11:00 ... ZEP 2018 5 31 6 35 0 2018-05-31T06:35:00Z 2018.4117104261795 2094-99 1928.39 0.91 78.9067 11.8883 479.0 474.0 5.0 P 446058 H11 2018-07-09T15:27:00 ... ZEP 2018 6 7 8 25 0 2018-06-07T08:25:00Z 2018.4310977929986 1083-99 1936.2 0.91 78.9067 11.8883 479.0 474.0 5.0 P 446055 H11 2018-07-09T15:43:00 ... ZEP 2018 6 7 8 25 0 2018-06-07T08:25:00Z 2018.4310977929986 1084-99 1935.3 0.91 78.9067 11.8883 479.0 474.0 5.0 P 446056 H11 2018-07-09T15:59:00 ... ZEP 2018 6 14 7 53 0 2018-06-14T07:53:00Z 2018.4502149923896 5563-99 1921.11 0.91 78.9067 11.8883 479.0 474.0 5.0 P 446463 H11 2018-07-18T14:39:00 ... ZEP 2018 6 14 7 53 0 2018-06-14T07:53:00Z 2018.4502149923896 5564-99 1920.96 0.91 78.9067 11.8883 479.0 474.0 5.0 P 446464 H11 2018-07-18T14:55:00 ... ZEP 2018 6 21 12 30 0 2018-06-21T12:30:00Z 2018.4699200913242 1677-99 1922.6 0.91 78.9067 11.8883 479.0 474.0 5.0 P 446461 H11 2018-07-18T14:07:00 ... ZEP 2018 6 21 12 30 0 2018-06-21T12:30:00Z 2018.4699200913242 1678-99 1921.79 0.91 78.9067 11.8883 479.0 474.0 5.0 P 446462 H11 2018-07-18T14:23:00 ... ZEP 2018 6 28 7 55 0 2018-06-28T07:55:00Z 2018.4885749619482 2225-99 1919.68 0.907 78.9067 11.8883 479.0 474.0 5.0 P 447048 H11 2018-08-07T10:03:00 ... ZEP 2018 6 28 7 55 0 2018-06-28T07:55:00Z 2018.4885749619482 2226-99 1921.65 0.907 78.9067 11.8883 479.0 474.0 5.0 P 447049 H11 2018-08-07T10:18:00 ... ZEP 2018 7 5 8 12 0 2018-07-05T08:12:00Z 2018.5077853881278 3885-99 1909.97 0.907 78.9067 11.8883 479.0 474.0 5.0 P 447046 H11 2018-08-07T09:31:00 ... ZEP 2018 7 5 8 12 0 2018-07-05T08:12:00Z 2018.5077853881278 3886-99 1909.05 0.907 78.9067 11.8883 479.0 474.0 5.0 P 447047 H11 2018-08-07T09:47:00 ... ZEP 2018 7 12 7 38 0 2018-07-12T07:38:00Z 2018.526898782344 5773-99 1907.28 0.907 78.9067 11.8883 479.0 474.0 5.0 P 447587 H11 2018-08-20T16:41:00 ... ZEP 2018 7 12 7 38 0 2018-07-12T07:38:00Z 2018.526898782344 5774-99 1907.7 0.907 78.9067 11.8883 479.0 474.0 5.0 P 447588 H11 2018-08-20T16:56:00 ... ZEP 2018 7 19 8 40 0 2018-07-19T08:40:00Z 2018.546194824962 3261-99 1902.61 0.907 78.9067 11.8883 479.0 474.0 5.0 P 447585 H11 2018-08-21T09:59:00 ... ZEP 2018 7 19 8 40 0 2018-07-19T08:40:00Z 2018.546194824962 3262-99 1901.85 0.907 78.9067 11.8883 479.0 474.0 5.0 P 447586 H11 2018-08-21T10:15:00 ... ZEP 2018 7 26 7 22 0 2018-07-26T07:22:00Z 2018.5652245053273 2141-99 1906.64 0.907 78.9067 11.8883 479.0 474.0 5.0 P 448563 H11 2018-09-07T09:49:00 ... ZEP 2018 7 26 7 22 0 2018-07-26T07:22:00Z 2018.5652245053273 276-99 1906.44 0.907 78.9067 11.8883 479.0 474.0 5.0 P 448564 H11 2018-09-07T10:05:00 ... ZEP 2018 8 2 7 26 0 2018-08-02T07:26:00Z 2018.5844101978691 2142-99 1923.47 0.907 78.9067 11.8883 479.0 474.0 5.0 P 448562 H11 2018-09-07T09:33:00 ... ZEP 2018 8 2 7 26 0 2018-08-02T07:26:00Z 2018.5844101978691 275-99 1924.47 0.907 78.9067 11.8883 479.0 474.0 5.0 P 448561 H11 2018-09-07T09:17:00 ... ZEP 2018 8 9 16 4 0 2018-08-09T16:04:00Z 2018.6045738203957 5715-99 1924.47 0.907 78.9067 11.8883 479.0 474.0 5.0 P 448769 H11 2018-09-10T11:47:00 ... ZEP 2018 8 9 16 4 0 2018-08-09T16:04:00Z 2018.6045738203957 5716-99 1924.57 0.907 78.9067 11.8883 479.0 474.0 5.0 P 448770 H11 2018-09-10T12:03:00 ... ZEP 2018 8 16 7 58 0 2018-08-16T07:58:00Z 2018.6228272450533 4549-99 1908.05 0.907 78.9067 11.8883 479.0 474.0 5.0 P 448767 H11 2018-09-10T11:16:00 ... ZEP 2018 8 16 7 58 0 2018-08-16T07:58:00Z 2018.6228272450533 4550-99 1907.75 0.907 78.9067 11.8883 479.0 474.0 5.0 P 448768 H11 2018-09-10T11:32:00 ... ZEP 2018 8 23 7 47 0 2018-08-23T07:47:00Z 2018.6419843987824 791-99 1936.88 0.907 78.9067 11.8883 479.0 474.0 5.0 P 449060 H11 2018-09-18T12:13:00 ... ZEP 2018 8 23 7 47 0 2018-08-23T07:47:00Z 2018.6419843987824 792-99 1936.83 0.907 78.9067 11.8883 479.0 474.0 5.0 P 449061 H11 2018-09-18T12:29:00 ... ZEP 2018 8 30 7 34 0 2018-08-30T07:34:00Z 2018.6611377473364 2273-99 1927.31 0.907 78.9067 11.8883 479.0 474.0 5.0 P 449058 H11 2018-09-18T12:45:00 ... ZEP 2018 8 30 7 34 0 2018-08-30T07:34:00Z 2018.6611377473364 2274-99 1928.34 0.907 78.9067 11.8883 479.0 474.0 5.0 P 449059 H11 2018-09-18T13:01:00 ... ZEP 2018 9 6 7 15 0 2018-09-06T07:15:00Z 2018.6802796803654 3401-99 1925.04 0.907 78.9067 11.8883 479.0 474.0 5.0 P 449700 H11 2018-10-02T10:29:00 ... ZEP 2018 9 6 7 15 0 2018-09-06T07:15:00Z 2018.6802796803654 3402-99 1924.96 0.907 78.9067 11.8883 479.0 474.0 5.0 P 449701 H11 2018-10-02T10:45:00 ... ZEP 2018 9 13 7 12 0 2018-09-13T07:12:00Z 2018.6994520547946 3125-99 1927.9 0.907 78.9067 11.8883 479.0 474.0 5.0 P 449698 H11 2018-10-02T11:01:00 ... ZEP 2018 9 13 7 12 0 2018-09-13T07:12:00Z 2018.6994520547946 3126-99 1925.99 0.907 78.9067 11.8883 479.0 474.0 5.0 P 449699 H11 2018-10-02T11:16:00 ... ZEP 2018 9 20 7 10 0 2018-09-20T07:10:00Z 2018.7186263318113 987-99 1935.8 0.907 78.9067 11.8883 479.0 474.0 5.0 P 450379 H11 2018-10-19T12:42:00 ... ZEP 2018 9 20 7 10 0 2018-09-20T07:10:00Z 2018.7186263318113 988-99 1935.73 0.907 78.9067 11.8883 479.0 474.0 5.0 P 450380 H11 2018-10-19T12:57:00 ... ZEP 2018 9 27 7 30 0 2018-09-27T07:30:00Z 2018.7378424657534 1947-99 1935.39 0.907 78.9067 11.8883 479.0 474.0 5.0 P 450381 H11 2018-10-19T12:10:00 ... ZEP 2018 9 27 7 30 0 2018-09-27T07:30:00Z 2018.7378424657534 1948-99 1934.48 0.907 78.9067 11.8883 479.0 474.0 5.0 P 450382 H11 2018-10-19T12:26:00 ... ZEP 2018 10 4 7 32 0 2018-10-04T07:32:00Z 2018.7570243531202 1609-99 1940.22 0.907 78.9067 11.8883 479.0 474.0 5.0 P 451105 H11 2018-11-06T15:00:00 ... ZEP 2018 10 4 7 32 0 2018-10-04T07:32:00Z 2018.7570243531202 1610-99 1940.2 0.907 78.9067 11.8883 479.0 474.0 5.0 P 451106 H11 2018-11-06T15:16:00 ... ZEP 2018 10 11 7 50 0 2018-10-11T07:50:00Z 2018.7762366818874 2289-99 1938.18 0.907 78.9067 11.8883 479.0 474.0 5.0 P 451103 H11 2018-11-06T13:26:00 ... ZEP 2018 10 11 7 50 0 2018-10-11T07:50:00Z 2018.7762366818874 2290-99 1937.57 0.907 78.9067 11.8883 479.0 474.0 5.0 P 451104 H11 2018-11-06T13:41:00 ... ZEP 2018 10 18 7 25 0 2018-10-18T07:25:00Z 2018.7953671993912 2949-99 1941.55 0.907 78.9067 11.8883 479.0 474.0 5.0 P 451558 H11 2018-11-20T16:07:00 ... ZEP 2018 10 18 7 25 0 2018-10-18T07:25:00Z 2018.7953671993912 2950-99 1941.57 0.907 78.9067 11.8883 479.0 474.0 5.0 P 451559 H11 2018-11-20T16:23:00 ... ZEP 2018 10 25 7 11 0 2018-10-25T07:11:00Z 2018.8145186453578 5693-99 1942.01 0.907 78.9067 11.8883 479.0 474.0 5.0 P 451560 H11 2018-11-21T08:43:00 ... ZEP 2018 10 25 7 11 0 2018-10-25T07:11:00Z 2018.8145186453578 5694-99 1942.6 0.907 78.9067 11.8883 479.0 474.0 5.0 P 451561 H11 2018-11-21T08:58:00 ... ZEP 2018 11 1 9 42 0 2018-11-01T09:42:00Z 2018.8339840182648 4523-99 1942.94 0.907 78.9067 11.8883 479.0 474.0 5.0 P 451854 H11 2018-11-29T10:06:00 ... ZEP 2018 11 1 9 42 0 2018-11-01T09:42:00Z 2018.8339840182648 4524-99 1941.72 0.907 78.9067 11.8883 479.0 474.0 5.0 P 451853 H11 2018-11-29T10:22:00 ... ZEP 2018 11 8 9 30 0 2018-11-08T09:30:00Z 2018.8531392694065 3105-99 1943.87 0.907 78.9067 11.8883 479.0 474.0 5.0 P 451851 H11 2018-11-29T09:35:00 ... ZEP 2018 11 8 9 30 0 2018-11-08T09:30:00Z 2018.8531392694065 3106-99 1944.64 0.907 78.9067 11.8883 479.0 474.0 5.0 P 451852 H11 2018-11-29T09:51:00 ... ZEP 2018 11 15 8 28 0 2018-11-15T08:28:00Z 2018.872199391172 1943-99 1942.62 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453029 H11 2019-01-16T12:12:00 ... ZEP 2018 11 15 8 28 0 2018-11-15T08:28:00Z 2018.872199391172 1944-99 1940.97 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453030 H11 2019-01-16T12:28:00 ... ZEP 2018 11 22 8 47 0 2018-11-22T08:47:00Z 2018.8914136225267 5617-99 1944.91 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453021 H11 2019-01-16T09:33:00 ... ZEP 2018 11 22 8 47 0 2018-11-22T08:47:00Z 2018.8914136225267 5618-99 1944.45 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453022 H11 2019-01-16T09:49:00 ... ZEP 2018 11 29 12 48 0 2018-11-29T12:48:00Z 2018.9110502283106 5075-99 1960.14 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453317 H11 2019-01-18T15:46:00 ... ZEP 2018 11 29 12 48 0 2018-11-29T12:48:00Z 2018.9110502283106 5076-99 1960.52 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453318 H11 2019-01-18T16:02:00 ... ZEP 2018 12 6 12 42 0 2018-12-06T12:42:00Z 2018.930216894977 3471-99 1959.62 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453315 H11 2019-01-18T16:18:00 ... ZEP 2018 12 6 12 42 0 2018-12-06T12:42:00Z 2018.930216894977 3472-99 1961.13 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453316 H11 2019-01-18T16:34:00 ... ZEP 2018 12 13 8 20 0 2018-12-13T08:20:00Z 2018.948896499239 5691-99 1936.6 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453349 H11 2019-01-17T15:34:00 ... ZEP 2018 12 13 8 20 0 2018-12-13T08:20:00Z 2018.948896499239 5692-99 1936.89 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453350 H11 2019-01-17T15:49:00 ... ZEP 2018 12 20 12 34 56 2018-12-20T12:34:56Z 2018.9685596144088 2217-99 1961.1 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453347 H11 2019-01-17T15:02:00 ... ZEP 2018 12 20 12 34 56 2018-12-20T12:34:56Z 2018.9685596144088 2218-99 1961.24 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453348 H11 2019-01-17T15:18:00 ... ZEP 2018 12 27 8 10 0 2018-12-27T08:10:00Z 2018.9872336377473 5527-99 1955.03 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453622 H11 2019-02-05T15:01:00 ... ZEP 2018 12 27 8 10 0 2018-12-27T08:10:00Z 2018.9872336377473 5528-99 1957.26 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453623 H11 2019-02-05T15:17:00 ... ZEP 2019 1 3 12 45 0 2019-01-03T12:45:00Z 2019.0069349315067 17-99 1960.87 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453620 H11 2019-02-05T15:33:00 ... ZEP 2019 1 3 12 45 0 2019-01-03T12:45:00Z 2019.0069349315067 18-99 1960.99 0.907 78.9067 11.8883 479.0 474.0 5.0 P 453621 H11 2019-02-05T15:49:00 ... ZEP 2019 1 11 9 12 0 2019-01-11T09:12:00Z 2019.0284474885846 453-99 1962.37 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455153 H11 2019-03-07T12:50:00 ... ZEP 2019 1 11 9 12 0 2019-01-11T09:12:00Z 2019.0284474885846 454-99 1961.29 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455154 H11 2019-03-07T13:06:00 ... ZEP 2019 1 17 8 9 0 2019-01-17T08:09:00Z 2019.044765981735 3783-99 1996.23 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455151 H11 2019-03-07T12:19:00 .S. ZEP 2019 1 17 8 9 0 2019-01-17T08:09:00Z 2019.044765981735 3784-99 1995.93 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455152 H11 2019-03-07T12:34:00 .S. ZEP 2019 1 24 8 17 0 2019-01-24T08:17:00Z 2019.0639592846271 4117-99 1979.97 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455149 H11 2019-03-07T11:15:00 ... ZEP 2019 1 24 8 17 0 2019-01-24T08:17:00Z 2019.0639592846271 4118-99 1978.55 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455150 H11 2019-03-07T11:31:00 ... ZEP 2019 1 31 8 9 0 2019-01-31T08:09:00Z 2019.0831221461187 2039-99 1995.33 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455147 H11 2019-03-07T11:47:00 .S. ZEP 2019 1 31 8 9 0 2019-01-31T08:09:00Z 2019.0831221461187 2040-99 1995.02 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455148 H11 2019-03-07T12:03:00 .S. ZEP 2019 2 7 10 48 0 2019-02-07T10:48:00Z 2019.102602739726 2633-99 1956.65 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455617 H11 2019-03-14T13:20:00 ... ZEP 2019 2 7 10 48 0 2019-02-07T10:48:00Z 2019.102602739726 2634-99 1958.2 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455618 H11 2019-03-14T13:36:00 ... ZEP 2019 2 14 8 20 0 2019-02-14T08:20:00Z 2019.121499238965 5659-99 1943.91 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455615 H11 2019-03-14T14:23:00 ... ZEP 2019 2 14 8 20 0 2019-02-14T08:20:00Z 2019.121499238965 5660-99 1944.02 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455616 H11 2019-03-14T14:39:00 ... ZEP 2019 2 21 8 24 0 2019-02-21T08:24:00Z 2019.140684931507 1259-99 1956.26 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455900 H11 2019-03-21T09:32:00 ... ZEP 2019 2 21 8 24 0 2019-02-21T08:24:00Z 2019.140684931507 1260-99 1956.91 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455901 H11 2019-03-21T09:48:00 ... ZEP 2019 2 28 8 45 0 2019-02-28T08:45:00Z 2019.1599029680365 5533-99 1964.24 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455898 H11 2019-03-20T16:26:00 ... ZEP 2019 2 28 8 45 0 2019-02-28T08:45:00Z 2019.1599029680365 5534-99 1963.01 0.907 78.9067 11.8883 479.0 474.0 5.0 P 455899 H11 2019-03-20T16:42:00 ... ZEP 2019 3 7 7 33 0 2019-03-07T07:33:00Z 2019.178944063927 469-99 1965.87 0.907 78.9067 11.8883 479.0 474.0 5.0 P 456725 H11 2019-04-11T17:26:00 ... ZEP 2019 3 7 7 33 0 2019-03-07T07:33:00Z 2019.178944063927 964-99 1966.83 0.907 78.9067 11.8883 479.0 474.0 5.0 P 456726 H11 2019-04-11T17:41:00 ... ZEP 2019 3 14 8 32 0 2019-03-14T08:32:00Z 2019.1982343987822 5529-99 1962.27 0.907 78.9067 11.8883 479.0 474.0 5.0 P 456723 H11 2019-04-11T17:57:00 ... ZEP 2019 3 14 8 32 0 2019-03-14T08:32:00Z 2019.1982343987822 5599-99 1961.43 0.907 78.9067 11.8883 479.0 474.0 5.0 P 456724 H11 2019-04-11T18:13:00 ... ZEP 2019 3 21 9 45 0 2019-03-21T09:45:00Z 2019.217551369863 5725-99 1956.4 0.907 78.9067 11.8883 479.0 474.0 5.0 P 457232 H11 2019-04-25T15:13:00 ... ZEP 2019 3 21 9 45 0 2019-03-21T09:45:00Z 2019.217551369863 5726-99 1955.72 0.907 78.9067 11.8883 479.0 474.0 5.0 P 457233 H11 2019-04-25T15:29:00 ... ZEP 2019 3 28 8 45 0 2019-03-28T08:45:00Z 2019.2366152968036 3931-99 1958.61 0.907 78.9067 11.8883 479.0 474.0 5.0 P 457234 H11 2019-04-25T14:42:00 ... ZEP 2019 3 28 8 45 0 2019-03-28T08:45:00Z 2019.2366152968036 3932-99 1959.32 0.907 78.9067 11.8883 479.0 474.0 5.0 P 457235 H11 2019-04-25T14:57:00 ... ZEP 2019 4 4 7 35 0 2019-04-04T07:35:00Z 2019.255660197869 2351-99 2016.06 0.907 78.9067 11.8883 479.0 474.0 5.0 P 458687 H11 2019-05-22T12:23:00 C.. ZEP 2019 4 4 7 35 0 2019-04-04T07:35:00Z 2019.255660197869 2352-99 1970.15 0.907 78.9067 11.8883 479.0 474.0 5.0 P 458688 H11 2019-05-22T12:39:00 C.. ZEP 2019 4 11 7 39 0 2019-04-11T07:39:00Z 2019.274845890411 3065-99 1948.22 0.907 78.9067 11.8883 479.0 474.0 5.0 P 458685 H11 2019-05-22T11:51:00 ... ZEP 2019 4 11 7 39 0 2019-04-11T07:39:00Z 2019.274845890411 3066-99 1947.09 0.907 78.9067 11.8883 479.0 474.0 5.0 P 458686 H11 2019-05-22T12:07:00 ... ZEP 2019 4 18 9 46 0 2019-04-18T09:46:00Z 2019.2942656012176 4649-99 1959.24 0.907 78.9067 11.8883 479.0 474.0 5.0 P 458679 H11 2019-05-21T14:21:00 ... ZEP 2019 4 18 9 46 0 2019-04-18T09:46:00Z 2019.2942656012176 4650-99 1959.07 0.907 78.9067 11.8883 479.0 474.0 5.0 P 458680 H11 2019-05-21T14:37:00 ... ZEP 2019 4 25 7 45 0 2019-04-25T07:45:00Z 2019.3132134703196 2375-99 1944.32 0.907 78.9067 11.8883 479.0 474.0 5.0 P 458681 H11 2019-05-21T13:50:00 ... ZEP 2019 4 25 7 45 0 2019-04-25T07:45:00Z 2019.3132134703196 2376-99 1944.21 0.907 78.9067 11.8883 479.0 474.0 5.0 P 458682 H11 2019-05-21T14:05:00 ... ZEP 2019 5 2 8 33 0 2019-05-02T08:33:00Z 2019.3324828767122 2225-99 1956.04 0.907 78.9067 11.8883 479.0 474.0 5.0 P 459427 H11 2019-06-17T11:28:00 ... ZEP 2019 5 2 8 33 0 2019-05-02T08:33:00Z 2019.3324828767122 2226-99 1955.67 0.907 78.9067 11.8883 479.0 474.0 5.0 P 459428 H11 2019-06-17T11:44:00 ... ZEP 2019 5 9 7 27 0 2019-05-09T07:27:00Z 2019.3515353881278 475-99 1951.61 0.907 78.9067 11.8883 479.0 474.0 5.0 P 459425 H11 2019-06-17T10:56:00 ... ZEP 2019 5 9 7 27 0 2019-05-09T07:27:00Z 2019.3515353881278 476-99 1951.62 0.907 78.9067 11.8883 479.0 474.0 5.0 P 459426 H11 2019-06-17T11:12:00 ... ZEP 2019 5 16 8 12 0 2019-05-16T08:12:00Z 2019.370799086758 2051-99 1944.59 0.907 78.9067 11.8883 479.0 474.0 5.0 P 460608 H11 2019-07-08T17:01:00 ... ZEP 2019 5 16 8 12 0 2019-05-16T08:12:00Z 2019.370799086758 2052-99 1944.5 0.907 78.9067 11.8883 479.0 474.0 5.0 P 460609 H11 2019-07-08T17:17:00 ... ZEP 2019 5 23 7 40 0 2019-05-23T07:40:00Z 2019.3899162861492 5603-99 1939.29 0.907 78.9067 11.8883 479.0 474.0 5.0 P 460614 H11 2019-07-09T09:31:00 ... ZEP 2019 5 23 7 40 0 2019-05-23T07:40:00Z 2019.3899162861492 5604-99 1938.9 0.907 78.9067 11.8883 479.0 474.0 5.0 P 460615 H11 2019-07-09T09:15:00 ... ZEP 2019 5 30 8 30 0 2019-05-30T08:30:00Z 2019.4091894977169 3529-99 1931.52 0.907 78.9067 11.8883 479.0 474.0 5.0 P 460530 H11 2019-07-03T10:52:00 ... ZEP 2019 5 30 8 30 0 2019-05-30T08:30:00Z 2019.4091894977169 3530-99 1932.15 0.907 78.9067 11.8883 479.0 474.0 5.0 P 460531 H11 2019-07-03T11:08:00 ... ZEP 2019 6 6 7 11 0 2019-06-06T07:11:00Z 2019.4282172754947 5379-99 1932.96 0.907 78.9067 11.8883 479.0 474.0 5.0 P 460528 H11 2019-07-03T11:23:00 ... ZEP 2019 6 6 7 11 0 2019-06-06T07:11:00Z 2019.4282172754947 5380-99 1931.8 0.907 78.9067 11.8883 479.0 474.0 5.0 P 460529 H11 2019-07-03T11:39:00 ... ZEP 2019 6 13 7 1 0 2019-06-13T07:01:00Z 2019.4473763318113 3885-99 1930.24 0.907 78.9067 11.8883 479.0 474.0 5.0 P 461598 H11 2019-07-25T10:47:00 ... ZEP 2019 6 13 7 1 0 2019-06-13T07:01:00Z 2019.4473763318113 3886-99 1930.03 0.907 78.9067 11.8883 479.0 474.0 5.0 P 461599 H11 2019-07-25T11:03:00 ... ZEP 2019 6 20 8 29 0 2019-06-20T08:29:00Z 2019.4667218417046 3963-99 1920.62 0.907 78.9067 11.8883 479.0 474.0 5.0 P 461597 H11 2019-07-25T11:19:00 ... ZEP 2019 6 20 8 29 0 2019-06-20T08:29:00Z 2019.4667218417046 3964-99 1921.16 0.907 78.9067 11.8883 479.0 474.0 5.0 P 461596 H11 2019-07-25T11:35:00 ... ZEP 2019 6 27 7 12 0 2019-06-27T07:12:00Z 2019.4857534246576 3493-99 1927.62 0.907 78.9067 11.8883 479.0 474.0 5.0 P 462053 H11 2019-08-05T16:33:00 ... ZEP 2019 6 27 7 12 0 2019-06-27T07:12:00Z 2019.4857534246576 3494-99 1928.68 0.907 78.9067 11.8883 479.0 474.0 5.0 P 462054 H11 2019-08-05T16:49:00 ... ZEP 2019 7 4 8 17 0 2019-07-04T08:17:00Z 2019.505055175038 4933-99 1941.16 0.907 78.9067 11.8883 479.0 474.0 5.0 P 462055 H11 2019-08-05T17:05:00 ... ZEP 2019 7 4 8 17 0 2019-07-04T08:17:00Z 2019.505055175038 4934-99 1942.52 0.907 78.9067 11.8883 479.0 474.0 5.0 P 462056 H11 2019-08-05T17:20:00 ... ZEP 2019 7 11 7 59 0 2019-07-11T07:59:00Z 2019.5241990106545 3895-99 1945.95 0.575 78.9067 11.8883 479.0 474.0 5.0 P 463668 PC2 2019-08-26T11:17:03 ... ZEP 2019 7 11 7 59 0 2019-07-11T07:59:00Z 2019.5241990106545 5589-99 1945.85 0.575 78.9067 11.8883 479.0 474.0 5.0 P 463669 PC2 2019-08-26T11:31:21 ... ZEP 2019 7 18 7 19 0 2019-07-18T07:19:00Z 2019.5433009893454 3353-99 1921.64 0.575 78.9067 11.8883 479.0 474.0 5.0 P 463667 PC2 2019-08-26T12:00:02 ... ZEP 2019 7 18 7 19 0 2019-07-18T07:19:00Z 2019.5433009893454 4883-99 1921.67 0.575 78.9067 11.8883 479.0 474.0 5.0 P 463666 PC2 2019-08-26T11:45:39 ... ZEP 2019 7 25 7 27 0 2019-07-25T07:27:00Z 2019.5624942922375 3299-99 1916.37 0.575 78.9067 11.8883 479.0 474.0 5.0 P 463609 PC2 2019-08-23T12:41:37 ... ZEP 2019 7 25 7 27 0 2019-07-25T07:27:00Z 2019.5624942922375 3570-99 1916.47 0.575 78.9067 11.8883 479.0 474.0 5.0 P 463610 PC2 2019-08-23T12:55:53 ... ZEP 2019 8 1 7 34 0 2019-08-01T07:34:00Z 2019.581685692542 3300-99 1920.34 0.575 78.9067 11.8883 479.0 474.0 5.0 P 463608 PC2 2019-08-23T13:24:24 ... ZEP 2019 8 1 7 34 0 2019-08-01T07:34:00Z 2019.581685692542 3569-99 1920.33 0.575 78.9067 11.8883 479.0 474.0 5.0 P 463607 PC2 2019-08-23T13:10:09 ... ZEP 2019 8 8 8 21 0 2019-08-08T08:21:00Z 2019.600953196347 3831-99 1928.08 0.575 78.9067 11.8883 479.0 474.0 5.0 P 464201 PC2 2019-09-06T15:01:39 ... ZEP 2019 8 8 8 21 0 2019-08-08T08:21:00Z 2019.600953196347 3832-99 1928.15 0.575 78.9067 11.8883 479.0 474.0 5.0 P 464202 PC2 2019-09-06T15:15:56 ... ZEP 2019 8 15 7 40 0 2019-08-15T07:40:00Z 2019.6200532724506 4815-99 1953.93 0.575 78.9067 11.8883 479.0 474.0 5.0 P 464199 PC2 2019-09-06T14:33:08 ... ZEP 2019 8 15 7 40 0 2019-08-15T07:40:00Z 2019.6200532724506 4816-99 1953.84 0.575 78.9067 11.8883 479.0 474.0 5.0 P 464200 PC2 2019-09-06T14:47:23 ... ZEP 2019 8 22 7 45 0 2019-08-22T07:45:00Z 2019.63924086758 3013-99 1948.89 0.575 78.9067 11.8883 479.0 474.0 5.0 P 465789 PC2 2019-10-11T15:09:14 ... ZEP 2019 8 22 7 45 0 2019-08-22T07:45:00Z 2019.63924086758 3014-99 1948.9 0.575 78.9067 11.8883 479.0 474.0 5.0 P 465790 PC2 2019-10-11T15:23:36 ... ZEP 2019 8 29 7 56 0 2019-08-29T07:56:00Z 2019.6584398782345 603-99 1936.33 0.575 78.9067 11.8883 479.0 474.0 5.0 P 465787 PC2 2019-10-11T15:37:58 ... ZEP 2019 8 29 7 56 0 2019-08-29T07:56:00Z 2019.6584398782345 604-99 1936.26 0.575 78.9067 11.8883 479.0 474.0 5.0 P 465788 PC2 2019-10-11T15:52:18 ... ZEP 2019 9 5 7 29 0 2019-09-05T07:29:00Z 2019.6775665905632 5155-99 1946.12 0.575 78.9067 11.8883 479.0 474.0 5.0 P 465771 PC2 2019-10-07T15:28:13 ... ZEP 2019 9 5 7 29 0 2019-09-05T07:29:00Z 2019.6775665905632 5156-99 1946.11 0.575 78.9067 11.8883 479.0 474.0 5.0 P 465772 PC2 2019-10-07T15:42:36 ... ZEP 2019 9 13 7 52 0 2019-09-13T07:52:00Z 2019.6995281582954 1149-99 1033.33 0.575 78.9067 11.8883 479.0 474.0 5.0 P 465773 PC2 2019-10-07T15:56:56 C.. ZEP 2019 9 13 7 52 0 2019-09-13T07:52:00Z 2019.6995281582954 1150-99 5.81 -999.999 78.9067 11.8883 479.0 474.0 5.0 P 465774 PC2 2019-10-07T16:11:16 C.. ZEP 2019 9 13 8 5 0 2019-09-13T08:05:00Z 2019.699552891933 3033-99 1987.39 0.575 78.9067 11.8883 479.0 474.0 5.0 P 466735 PC2 2019-11-08T15:09:33 .S. ZEP 2019 9 13 8 5 0 2019-09-13T08:05:00Z 2019.699552891933 3034-99 1987.64 0.575 78.9067 11.8883 479.0 474.0 5.0 P 466736 PC2 2019-11-08T15:23:53 .S. ZEP 2019 9 19 8 2 0 2019-09-19T08:02:00Z 2019.715985540335 3955-99 1952.5 0.575 78.9067 11.8883 479.0 474.0 5.0 P 466733 PC2 2019-11-08T15:38:13 ... ZEP 2019 9 19 8 2 0 2019-09-19T08:02:00Z 2019.715985540335 3956-99 1952.4 0.575 78.9067 11.8883 479.0 474.0 5.0 P 466734 PC2 2019-11-08T15:52:33 ... ZEP 2019 9 26 8 16 0 2019-09-26T08:16:00Z 2019.7351902587518 3931-99 1952.68 0.575 78.9067 11.8883 479.0 474.0 5.0 P 466731 PC2 2019-11-12T11:41:00 ... ZEP 2019 9 26 8 16 0 2019-09-26T08:16:00Z 2019.7351902587518 3932-99 1952.57 0.575 78.9067 11.8883 479.0 474.0 5.0 P 466732 PC2 2019-11-12T11:55:18 ... ZEP 2019 10 3 7 47 0 2019-10-03T07:47:00Z 2019.7543131659056 3487-99 1974.83 0.575 78.9067 11.8883 479.0 474.0 5.0 P 466729 PC2 2019-11-12T12:09:35 ... ZEP 2019 10 3 7 47 0 2019-10-03T07:47:00Z 2019.7543131659056 3488-99 1974.92 0.575 78.9067 11.8883 479.0 474.0 5.0 P 466730 PC2 2019-11-12T12:23:53 ... ZEP 2019 10 10 7 50 0 2019-10-10T07:50:00Z 2019.77349695586 5379-99 1954.86 0.575 78.9067 11.8883 479.0 474.0 5.0 P 467012 PC2 2019-11-15T14:58:45 ... ZEP 2019 10 10 7 50 0 2019-10-10T07:50:00Z 2019.77349695586 5380-99 1954.76 0.575 78.9067 11.8883 479.0 474.0 5.0 P 467013 PC2 2019-11-15T15:13:02 ... ZEP 2019 10 17 7 45 0 2019-10-17T07:45:00Z 2019.7926655251142 1057-99 1949.81 0.575 78.9067 11.8883 479.0 474.0 5.0 P 467014 PC2 2019-11-15T15:27:20 ... ZEP 2019 10 17 7 45 0 2019-10-17T07:45:00Z 2019.7926655251142 1058-99 1949.84 0.575 78.9067 11.8883 479.0 474.0 5.0 P 467015 PC2 2019-11-15T15:41:38 ... ZEP 2019 10 24 7 29 0 2019-10-24T07:29:00Z 2019.8118131659057 1823-99 1963.02 0.575 78.9067 11.8883 479.0 474.0 5.0 P 467796 PC2 2019-12-04T16:07:44 ... ZEP 2019 10 24 7 29 0 2019-10-24T07:29:00Z 2019.8118131659057 1824-99 1963.1 0.575 78.9067 11.8883 479.0 474.0 5.0 P 467797 PC2 2019-12-04T16:22:06 ... ZEP 2019 10 31 8 47 0 2019-10-31T08:47:00Z 2019.831139649924 3677-99 1966.08 0.575 78.9067 11.8883 479.0 474.0 5.0 P 467798 PC2 2019-12-04T15:39:04 ... ZEP 2019 10 31 8 47 0 2019-10-31T08:47:00Z 2019.831139649924 3678-99 1966.14 0.575 78.9067 11.8883 479.0 474.0 5.0 P 467799 PC2 2019-12-04T15:53:26 ... ZEP 2019 11 7 8 21 0 2019-11-07T08:21:00Z 2019.8502682648402 2041-99 1961.41 0.575 78.9067 11.8883 479.0 474.0 5.0 P 468112 PC2 2019-12-19T11:21:29 ... ZEP 2019 11 7 8 21 0 2019-11-07T08:21:00Z 2019.8502682648402 2042-99 1961.35 0.575 78.9067 11.8883 479.0 474.0 5.0 P 468113 PC2 2019-12-19T11:35:46 ... ZEP 2019 11 14 9 37 0 2019-11-14T09:37:00Z 2019.8695909436833 4649-99 1965.79 0.575 78.9067 11.8883 479.0 474.0 5.0 P 468110 PC2 2019-12-19T10:52:51 ... ZEP 2019 11 14 9 37 0 2019-11-14T09:37:00Z 2019.8695909436833 4650-99 1965.84 0.575 78.9067 11.8883 479.0 474.0 5.0 P 468111 PC2 2019-12-19T11:07:08 ... ZEP 2019 11 21 8 39 0 2019-11-21T08:39:00Z 2019.888658675799 367-99 1962.13 0.575 78.9067 11.8883 479.0 474.0 5.0 P 468808 PC2 2020-01-22T15:11:21 ... ZEP 2019 11 21 8 39 0 2019-11-21T08:39:00Z 2019.888658675799 368-99 1962.12 0.575 78.9067 11.8883 479.0 474.0 5.0 P 468809 PC2 2020-01-22T15:25:41 ... ZEP 2019 11 28 8 24 0 2019-11-28T08:24:00Z 2019.9078082191782 3679-99 1956.78 0.575 78.9067 11.8883 479.0 474.0 5.0 P 468806 PC2 2020-01-22T15:40:01 ... ZEP 2019 11 28 8 24 0 2019-11-28T08:24:00Z 2019.9078082191782 3680-99 1956.73 0.575 78.9067 11.8883 479.0 474.0 5.0 P 468807 PC2 2020-01-22T15:54:21 ... ZEP 2019 12 6 9 10 0 2019-12-06T09:10:00Z 2019.9298135464232 1519-99 1979.46 0.575 78.9067 11.8883 479.0 474.0 5.0 P 469634 PC2 2020-02-03T12:25:53 ... ZEP 2019 12 6 9 10 0 2019-12-06T09:10:00Z 2019.9298135464232 1520-99 1979.43 0.575 78.9067 11.8883 479.0 474.0 5.0 P 469633 PC2 2020-02-03T12:40:13 ... ZEP 2019 12 12 8 15 0 2019-12-12T08:15:00Z 2019.946147260274 129-99 1977.67 0.575 78.9067 11.8883 479.0 474.0 5.0 P 469631 PC2 2020-02-03T11:57:13 ... ZEP 2019 12 12 8 15 0 2019-12-12T08:15:00Z 2019.946147260274 130-99 1977.71 0.575 78.9067 11.8883 479.0 474.0 5.0 P 469632 PC2 2020-02-03T12:11:33 ... ZEP 2019 12 19 8 30 0 2019-12-19T08:30:00Z 2019.9653538812786 3357-99 1959.66 0.575 78.9067 11.8883 479.0 474.0 5.0 P 470068 PC2 2020-02-14T11:42:06 ... ZEP 2019 12 19 8 30 0 2019-12-19T08:30:00Z 2019.9653538812786 3358-99 1959.62 0.575 78.9067 11.8883 479.0 474.0 5.0 P 470069 PC2 2020-02-14T11:56:25 ... ZEP 2019 12 26 12 42 0 2019-12-26T12:42:00Z 2019.9850114155252 5129-99 1965.77 0.575 78.9067 11.8883 479.0 474.0 5.0 P 470066 PC2 2020-02-14T15:03:18 ... ZEP 2019 12 26 12 42 0 2019-12-26T12:42:00Z 2019.9850114155252 5130-99 1965.77 0.575 78.9067 11.8883 479.0 474.0 5.0 P 470067 PC2 2020-02-14T15:17:35 ... ZEP 2020 1 2 8 7 0 2020-01-02T08:07:00Z 2020.0036562689738 2047-99 1955.35 0.575 78.9067 11.8883 479.0 474.0 5.0 P 471408 PC2 2020-03-09T12:23:46 ... ZEP 2020 1 2 8 7 0 2020-01-02T08:07:00Z 2020.0036562689738 2048-99 1955.42 0.575 78.9067 11.8883 479.0 474.0 5.0 P 471409 PC2 2020-03-09T12:38:11 ... ZEP 2020 1 16 7 52 0 2020-01-16T07:52:00Z 2020.041879174256 4821-99 1983.7 0.575 78.9067 11.8883 479.0 474.0 5.0 P 471410 PC2 2020-03-09T11:55:04 ... ZEP 2020 1 16 7 52 0 2020-01-16T07:52:00Z 2020.041879174256 4822-99 1983.77 0.575 78.9067 11.8883 479.0 474.0 5.0 P 471411 PC2 2020-03-09T12:09:25 ... ZEP 2020 1 23 8 41 0 2020-01-23T08:41:00Z 2020.0610978293867 3605-99 1969.29 0.575 78.9067 11.8883 479.0 474.0 5.0 P 471129 PC2 2020-03-05T12:04:49 ... ZEP 2020 1 23 8 41 0 2020-01-23T08:41:00Z 2020.0610978293867 3606-99 1969.47 0.575 78.9067 11.8883 479.0 474.0 5.0 P 471130 PC2 2020-03-05T12:19:09 ... ZEP 2020 1 29 8 14 0 2020-01-29T08:14:00Z 2020.0774400425016 3796-99 1959.94 0.575 78.9067 11.8883 479.0 474.0 5.0 P 471132 PC2 2020-03-05T12:47:47 ... ZEP 2020 1 29 8 14 0 2020-01-29T08:14:00Z 2020.0774400425016 780-99 1960.05 0.575 78.9067 11.8883 479.0 474.0 5.0 P 471131 PC2 2020-03-05T12:33:28 ... ZEP 2020 2 6 8 5 0 2020-02-06T08:05:00Z 2020.099280889496 2554-99 1974.05 0.575 78.9067 11.8883 479.0 474.0 5.0 P 471739 PC2 2020-03-25T15:36:01 ... ZEP 2020 2 6 8 5 0 2020-02-06T08:05:00Z 2020.099280889496 5113-99 1973.99 0.575 78.9067 11.8883 479.0 474.0 5.0 P 471740 PC2 2020-03-25T15:21:41 ... ZEP 2020 2 13 9 22 0 2020-02-13T09:22:00Z 2020.118552671524 1841-99 1980.27 0.575 78.9067 11.8883 479.0 474.0 5.0 P 471737 PC2 2020-03-25T14:52:58 ... ZEP 2020 2 13 9 22 0 2020-02-13T09:22:00Z 2020.118552671524 978-99 1980.32 0.575 78.9067 11.8883 479.0 474.0 5.0 P 471738 PC2 2020-03-25T15:07:18 ... ZEP 2020 2 20 13 19 0 2020-02-20T13:19:00Z 2020.1381280358228 1885-99 1987.33 0.575 78.9067 11.8883 479.0 474.0 5.0 P 472746 PC2 2020-04-07T14:18:13 ... ZEP 2020 2 20 13 19 0 2020-02-20T13:19:00Z 2020.1381280358228 1886-99 1987.36 0.575 78.9067 11.8883 479.0 474.0 5.0 P 472747 PC2 2020-04-07T14:32:34 ... ZEP 2020 2 27 8 27 0 2020-02-27T08:27:00Z 2020.1566996812387 2251-99 1985.01 0.575 78.9067 11.8883 479.0 474.0 5.0 P 472592 PC2 2020-04-03T14:37:30 ... ZEP 2020 2 27 8 27 0 2020-02-27T08:27:00Z 2020.1566996812387 2252-99 1984.88 0.575 78.9067 11.8883 479.0 474.0 5.0 P 472593 PC2 2020-04-03T14:51:50 ... ZEP 2020 3 5 8 52 0 2020-03-05T08:52:00Z 2020.1758727990286 3629-99 1966.64 0.575 78.9067 11.8883 479.0 474.0 5.0 P 472991 PC2 2020-04-15T12:10:01 ... ZEP 2020 3 5 8 52 0 2020-03-05T08:52:00Z 2020.1758727990286 3630-99 1966.6 0.575 78.9067 11.8883 479.0 474.0 5.0 P 472992 PC2 2020-04-15T12:24:24 ... ZEP 2020 3 12 8 33 0 2020-03-12T08:33:00Z 2020.194962431694 513-99 1973.89 0.575 78.9067 11.8883 479.0 474.0 5.0 P 472989 PC2 2020-04-15T12:38:43 ... ZEP 2020 3 12 8 33 0 2020-03-12T08:33:00Z 2020.194962431694 514-99 1974.01 0.575 78.9067 11.8883 479.0 474.0 5.0 P 472990 PC2 2020-04-15T12:53:01 ... ZEP 2020 3 19 8 15 0 2020-03-19T08:15:00Z 2020.2140539617487 677-99 1975.41 0.575 78.9067 11.8883 479.0 474.0 5.0 P 473298 PC2 2020-04-20T10:49:09 ... ZEP 2020 3 19 8 15 0 2020-03-19T08:15:00Z 2020.2140539617487 678-99 1975.43 0.575 78.9067 11.8883 479.0 474.0 5.0 P 473299 PC2 2020-04-20T11:03:27 ... ZEP 2020 3 26 10 28 0 2020-03-26T10:28:00Z 2020.2334319975714 5555-99 1969.13 0.575 78.9067 11.8883 479.0 474.0 5.0 P 473300 PC2 2020-04-20T11:17:47 ... ZEP 2020 3 26 10 28 0 2020-03-26T10:28:00Z 2020.2334319975714 5556-99 1969.16 0.575 78.9067 11.8883 479.0 474.0 5.0 P 473301 PC2 2020-04-20T11:32:05 ... ZEP 2020 4 2 7 57 0 2020-04-02T07:57:00Z 2020.2522711748634 3033-99 1969.97 0.575 78.9067 11.8883 479.0 474.0 5.0 P 474118 PC2 2020-05-12T14:19:45 ... ZEP 2020 4 2 7 57 0 2020-04-02T07:57:00Z 2020.2522711748634 3034-99 1969.52 0.575 78.9067 11.8883 479.0 474.0 5.0 P 474119 PC2 2020-05-12T14:34:05 ... ZEP 2020 4 9 6 45 0 2020-04-09T06:45:00Z 2020.2712602459017 2167-99 1967.37 0.575 78.9067 11.8883 479.0 474.0 5.0 P 474116 PC2 2020-05-12T13:50:57 ... ZEP 2020 4 9 6 45 0 2020-04-09T06:45:00Z 2020.2712602459017 2168-99 1967.5 0.575 78.9067 11.8883 479.0 474.0 5.0 P 474117 PC2 2020-05-12T14:05:21 ... ZEP 2020 4 16 8 0 0 2020-04-16T08:00:00Z 2020.2905282331512 3187-99 1958.26 0.575 78.9067 11.8883 479.0 474.0 5.0 P 474114 PC2 2020-05-12T12:53:45 ... ZEP 2020 4 16 8 0 0 2020-04-16T08:00:00Z 2020.2905282331512 3188-99 1958.29 0.575 78.9067 11.8883 479.0 474.0 5.0 P 474115 PC2 2020-05-12T13:08:03 ... ZEP 2020 4 23 8 1 0 2020-04-23T08:01:00Z 2020.3096558136006 1999-99 1964.38 0.575 78.9067 11.8883 479.0 474.0 5.0 P 474136 PC2 2020-05-12T15:17:11 ... ZEP 2020 4 23 8 1 0 2020-04-23T08:01:00Z 2020.3096558136006 2000-99 1964.36 0.575 78.9067 11.8883 479.0 474.0 5.0 P 474137 PC2 2020-05-12T15:31:31 ... ZEP 2020 4 30 7 33 0 2020-04-30T07:33:00Z 2020.3287283697632 2690-99 1951.31 0.575 78.9067 11.8883 479.0 474.0 5.0 P 475911 PC2 2020-06-16T12:42:24 ... ZEP 2020 4 30 7 33 0 2020-04-30T07:33:00Z 2020.3287283697632 3065-99 1951.27 0.575 78.9067 11.8883 479.0 474.0 5.0 P 475910 PC2 2020-06-16T12:28:04 ... ZEP 2020 5 7 7 4 0 2020-05-07T07:04:00Z 2020.3477990285367 2689-99 1958.55 0.575 78.9067 11.8883 479.0 474.0 5.0 P 475821 PC2 2020-06-16T12:56:47 ... ZEP 2020 5 7 7 4 0 2020-05-07T07:04:00Z 2020.3477990285367 3066-99 1958.5 0.575 78.9067 11.8883 479.0 474.0 5.0 P 475822 PC2 2020-06-16T13:11:07 ... ZEP 2020 5 14 8 10 0 2020-05-14T08:10:00Z 2020.3670499392836 5467-99 1953.42 0.575 78.9067 11.8883 479.0 474.0 5.0 P 476280 PC2 2020-07-08T15:04:24 ... ZEP 2020 5 14 8 10 0 2020-05-14T08:10:00Z 2020.3670499392836 5468-99 1953.43 0.575 78.9067 11.8883 479.0 474.0 5.0 P 476281 PC2 2020-07-08T15:18:45 ... ZEP 2020 5 21 6 45 0 2020-05-21T06:45:00Z 2020.3860143442623 385-99 1951.99 0.575 78.9067 11.8883 479.0 474.0 5.0 P 476282 PC2 2020-07-08T15:33:06 ... ZEP 2020 5 21 6 45 0 2020-05-21T06:45:00Z 2020.3860143442623 386-99 1952.12 0.575 78.9067 11.8883 479.0 474.0 5.0 P 476283 PC2 2020-07-08T15:47:26 ... ZEP 2020 5 28 7 35 0 2020-05-28T07:35:00Z 2020.405234896782 3801-99 1946.34 0.575 78.9067 11.8883 479.0 474.0 5.0 P 476278 PC2 2020-07-08T14:35:38 ... ZEP 2020 5 28 7 35 0 2020-05-28T07:35:00Z 2020.405234896782 3802-99 1946.18 0.575 78.9067 11.8883 479.0 474.0 5.0 P 476279 PC2 2020-07-08T14:50:01 ... ZEP 2020 6 4 8 8 0 2020-06-04T08:08:00Z 2020.4244231936855 4901-99 1943.11 0.575 78.9067 11.8883 479.0 474.0 5.0 P 476292 PC2 2020-07-07T10:02:15 ... ZEP 2020 6 4 8 8 0 2020-06-04T08:08:00Z 2020.4244231936855 4902-99 1943.13 0.575 78.9067 11.8883 479.0 474.0 5.0 P 476293 PC2 2020-07-07T10:16:38 ... ZEP 2020 6 11 7 19 0 2020-06-11T07:19:00Z 2020.4434559046751 1862-99 1944.57 0.575 78.9067 11.8883 479.0 474.0 5.0 P 477124 PC2 2020-07-21T16:54:45 ... ZEP 2020 6 11 7 19 0 2020-06-11T07:19:00Z 2020.4434559046751 4579-99 1944.58 0.575 78.9067 11.8883 479.0 474.0 5.0 P 477125 PC2 2020-07-21T16:40:20 ... ZEP 2020 6 18 7 4 0 2020-06-18T07:04:00Z 2020.4625531268973 3702-99 1937.11 0.575 78.9067 11.8883 479.0 474.0 5.0 P 477122 PC2 2020-07-21T17:23:36 ... ZEP 2020 6 18 7 4 0 2020-06-18T07:04:00Z 2020.4625531268973 5387-99 1937.13 0.575 78.9067 11.8883 479.0 474.0 5.0 P 477123 PC2 2020-07-21T17:09:10 ... ZEP 2020 6 25 8 30 0 2020-06-25T08:30:00Z 2020.481841985428 1977-99 1940.72 0.575 78.9067 11.8883 479.0 474.0 5.0 P 478148 PC2 2020-08-10T09:44:39 ... ZEP 2020 6 25 8 30 0 2020-06-25T08:30:00Z 2020.481841985428 1978-99 1940.78 0.575 78.9067 11.8883 479.0 474.0 5.0 P 478149 PC2 2020-08-10T09:58:58 ... ZEP 2020 7 2 7 10 0 2020-07-02T07:10:00Z 2020.5008158773528 3413-99 1954.36 0.575 78.9067 11.8883 479.0 474.0 5.0 P 478146 PC2 2020-08-07T16:10:29 ... ZEP 2020 7 2 7 10 0 2020-07-02T07:10:00Z 2020.5008158773528 3414-99 1954.52 0.575 78.9067 11.8883 479.0 474.0 5.0 P 478147 PC2 2020-08-07T16:24:49 ... ZEP 2020 7 9 8 2 0 2020-07-09T08:02:00Z 2020.520040224651 3405-99 1960.03 0.575 78.9067 11.8883 479.0 474.0 5.0 P 478791 PC2 2020-08-19T13:19:43 ... ZEP 2020 7 9 8 2 0 2020-07-09T08:02:00Z 2020.520040224651 3406-99 1960.18 0.575 78.9067 11.8883 479.0 474.0 5.0 P 478792 PC2 2020-08-19T13:34:03 ... ZEP 2020 7 16 7 25 0 2020-07-16T07:25:00Z 2020.539095704311 5565-99 1954.75 0.575 78.9067 11.8883 479.0 474.0 5.0 P 478789 PC2 2020-08-19T13:48:21 ... ZEP 2020 7 16 7 25 0 2020-07-16T07:25:00Z 2020.539095704311 5566-99 1954.57 0.575 78.9067 11.8883 479.0 474.0 5.0 P 478790 PC2 2020-08-19T14:02:41 ... ZEP 2020 7 23 7 56 0 2020-07-23T07:56:00Z 2020.558280206436 175-99 1937.07 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480063 PC2 2020-09-28T11:03:02 ... ZEP 2020 7 23 7 56 0 2020-07-23T07:56:00Z 2020.558280206436 176-99 1937.12 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480064 PC2 2020-09-28T11:17:26 ... ZEP 2020 7 30 7 35 0 2020-07-30T07:35:00Z 2020.577366044323 3293-99 1985.86 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480061 PC2 2020-09-28T11:31:52 ... ZEP 2020 7 30 7 35 0 2020-07-30T07:35:00Z 2020.577366044323 3294-99 1985.84 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480062 PC2 2020-09-28T11:46:16 ... ZEP 2020 8 13 8 14 0 2020-08-13T08:14:00Z 2020.6156914086218 513-99 1945.16 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480006 PC2 2020-09-25T19:03:57 ... ZEP 2020 8 13 8 14 0 2020-08-13T08:14:00Z 2020.6156914086218 514-99 1945.31 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480007 PC2 2020-09-25T19:18:20 ... ZEP 2020 8 20 7 51 0 2020-08-20T07:51:00Z 2020.6347734517303 1111-99 1974.95 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480008 PC2 2020-09-25T18:35:22 ... ZEP 2020 8 20 7 51 0 2020-08-20T07:51:00Z 2020.6347734517303 1112-99 1974.86 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480009 PC2 2020-09-25T18:49:38 ... ZEP 2020 8 27 7 6 0 2020-08-27T07:06:00Z 2020.6538137522768 5123-99 1960.36 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480238 PC2 2020-10-01T10:50:16 ... ZEP 2020 8 27 7 6 0 2020-08-27T07:06:00Z 2020.6538137522768 5124-99 1960.47 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480239 PC2 2020-10-01T11:04:32 ... ZEP 2020 9 3 8 55 0 2020-09-03T08:55:00Z 2020.673146250759 851-99 1957.68 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480240 PC2 2020-10-01T11:18:48 ... ZEP 2020 9 3 8 55 0 2020-09-03T08:55:00Z 2020.673146250759 852-99 1957.68 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480241 PC2 2020-10-01T11:33:05 ... ZEP 2020 9 10 7 26 0 2020-09-10T07:26:00Z 2020.6921030661808 371-99 1963.18 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480708 PC2 2020-10-13T12:39:16 ... ZEP 2020 9 10 7 26 0 2020-09-10T07:26:00Z 2020.6921030661808 372-99 1963.34 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480709 PC2 2020-10-13T12:53:31 ... ZEP 2020 9 17 7 16 0 2020-09-17T07:16:00Z 2020.711209775349 4723-99 1961.71 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480710 PC2 2020-10-13T13:07:49 ... ZEP 2020 9 17 7 16 0 2020-09-17T07:16:00Z 2020.711209775349 4724-99 1961.86 0.575 78.9067 11.8883 479.0 474.0 5.0 P 480711 PC2 2020-10-13T13:22:04 ... ZEP 2020 9 24 6 46 0 2020-09-24T06:46:00Z 2020.7302785367335 3963-99 1990.34 0.575 78.9067 11.8883 479.0 474.0 5.0 P 481177 PC2 2020-10-27T10:22:16 ... ZEP 2020 9 24 6 46 0 2020-09-24T06:46:00Z 2020.7302785367335 3964-99 1990.24 0.575 78.9067 11.8883 479.0 474.0 5.0 P 481176 PC2 2020-10-27T10:36:32 ... ZEP 2020 10 1 8 22 0 2020-10-01T08:22:00Z 2020.749586369156 3683-99 1978.93 0.575 78.9067 11.8883 479.0 474.0 5.0 P 481178 PC2 2020-10-23T16:55:50 ... ZEP 2020 10 1 8 22 0 2020-10-01T08:22:00Z 2020.749586369156 3684-99 1979.25 0.575 78.9067 11.8883 479.0 474.0 5.0 P 481179 PC2 2020-10-23T17:10:05 ... ZEP 2020 10 8 7 34 0 2020-10-08T07:34:00Z 2020.768620977535 2049-99 1974.54 0.575 78.9067 11.8883 479.0 474.0 5.0 P 481902 PC2 2020-11-13T12:48:45 ... ZEP 2020 10 8 7 34 0 2020-10-08T07:34:00Z 2020.768620977535 2050-99 1974.48 0.575 78.9067 11.8883 479.0 474.0 5.0 P 481903 PC2 2020-11-13T13:03:00 ... ZEP 2020 10 15 7 33 0 2020-10-15T07:33:00Z 2020.7877447632059 3515-99 1980.13 0.575 78.9067 11.8883 479.0 474.0 5.0 P 481900 PC2 2020-11-13T13:17:14 ... ZEP 2020 10 15 7 33 0 2020-10-15T07:33:00Z 2020.7877447632059 3516-99 1980.26 0.575 78.9067 11.8883 479.0 474.0 5.0 P 481901 PC2 2020-11-13T13:31:29 ... ZEP 2020 10 22 6 20 0 2020-10-22T06:20:00Z 2020.806731936855 4029-99 1989.77 0.575 78.9067 11.8883 479.0 474.0 5.0 P 482491 PC2 2020-11-24T13:19:17 ... ZEP 2020 10 22 6 20 0 2020-10-22T06:20:00Z 2020.806731936855 4030-99 1990.01 0.575 78.9067 11.8883 479.0 474.0 5.0 P 482492 PC2 2020-11-24T13:33:32 ... ZEP 2020 10 30 8 18 0 2020-10-30T08:18:00Z 2020.8288137522768 5903-99 1976.78 0.575 78.9067 11.8883 479.0 474.0 5.0 P 482489 PC2 2020-11-24T12:50:44 ... ZEP 2020 10 30 8 18 0 2020-10-30T08:18:00Z 2020.8288137522768 5904-99 1976.61 0.575 78.9067 11.8883 479.0 474.0 5.0 P 482490 PC2 2020-11-24T13:05:02 ... ZEP 2020 11 5 8 20 0 2020-11-05T08:20:00Z 2020.8452109896782 5733-99 2008.28 0.575 78.9067 11.8883 479.0 474.0 5.0 P 482830 PC2 2020-12-04T15:57:38 ... ZEP 2020 11 5 8 20 0 2020-11-05T08:20:00Z 2020.8452109896782 5734-99 2008.26 0.575 78.9067 11.8883 479.0 474.0 5.0 P 482831 PC2 2020-12-04T16:11:56 ... ZEP 2020 11 13 8 24 0 2020-11-13T08:24:00Z 2020.8670765027323 5899-99 1977.13 0.575 78.9067 11.8883 479.0 474.0 5.0 P 482832 PC2 2020-12-04T15:29:08 ... ZEP 2020 11 13 8 24 0 2020-11-13T08:24:00Z 2020.8670765027323 5900-99 1977.07 0.575 78.9067 11.8883 479.0 474.0 5.0 P 482833 PC2 2020-12-04T15:43:23 ... ZEP 2020 11 19 7 28 0 2020-11-19T07:28:00Z 2020.8833636915604 129-99 1990.35 0.575 78.9067 11.8883 479.0 474.0 5.0 P 483695 PC2 2020-12-22T15:04:43 ... ZEP 2020 11 19 7 28 0 2020-11-19T07:28:00Z 2020.8833636915604 130-99 1990.38 0.575 78.9067 11.8883 479.0 474.0 5.0 P 483696 PC2 2020-12-22T15:18:58 ... ZEP 2020 11 26 8 9 0 2020-11-26T08:09:00Z 2020.9025671675774 1651-99 1985.41 0.575 78.9067 11.8883 479.0 474.0 5.0 P 483693 PC2 2020-12-22T14:36:10 ... ZEP 2020 11 26 8 9 0 2020-11-26T08:09:00Z 2020.9025671675774 1652-99 1985.3 0.575 78.9067 11.8883 479.0 474.0 5.0 P 483694 PC2 2020-12-22T14:50:27 ... ZEP 2020 12 4 8 58 0 2020-12-04T08:58:00Z 2020.9245180631451 987-99 1988.03 0.575 78.9067 11.8883 479.0 474.0 5.0 P 484280 PC2 2021-01-07T15:45:20 ... ZEP 2020 12 4 8 58 0 2020-12-04T08:58:00Z 2020.9245180631451 988-99 1988.26 0.575 78.9067 11.8883 479.0 474.0 5.0 P 484281 PC2 2021-01-07T15:59:35 ... ZEP 2020 12 10 8 55 0 2020-12-10T08:55:00Z 2020.9409058136005 2651-99 1980.53 0.575 78.9067 11.8883 479.0 474.0 5.0 P 484282 PC2 2021-01-07T15:16:44 ... ZEP 2020 12 10 8 55 0 2020-12-10T08:55:00Z 2020.9409058136005 2652-99 1980.37 0.575 78.9067 11.8883 479.0 474.0 5.0 P 484283 PC2 2021-01-07T15:31:04 ... ZEP 2020 12 17 8 4 0 2020-12-17T08:04:00Z 2020.9599347298117 5877-99 1991.06 0.575 78.9067 11.8883 479.0 474.0 5.0 P 484788 PC2 2021-01-29T15:13:09 ... ZEP 2020 12 17 8 4 0 2020-12-17T08:04:00Z 2020.9599347298117 5878-99 1991.06 0.575 78.9067 11.8883 479.0 474.0 5.0 P 484789 PC2 2021-01-29T15:27:24 ... ZEP 2020 12 28 8 38 0 2020-12-28T08:38:00Z 2020.990053885853 2453-99 1976.86 0.575 78.9067 11.8883 479.0 474.0 5.0 P 484790 PC2 2021-01-29T15:41:42 ... ZEP 2020 12 28 8 38 0 2020-12-28T08:38:00Z 2020.990053885853 2454-99 1976.98 0.575 78.9067 11.8883 479.0 474.0 5.0 P 484791 PC2 2021-01-29T15:55:57 ... ZEP 2020 12 31 8 7 0 2020-12-31T08:07:00Z 2020.9981917880996 5797-99 2006.6 0.575 78.9067 11.8883 479.0 474.0 5.0 P 484970 PC2 2021-01-27T16:38:18 ... ZEP 2020 12 31 8 7 0 2020-12-31T08:07:00Z 2020.9981917880996 5798-99 2006.6 0.575 78.9067 11.8883 479.0 474.0 5.0 P 484971 PC2 2021-01-27T16:52:33 ... ZEP 2021 1 7 8 8 0 2021-01-07T08:08:00Z 2021.0173668188736 5913-99 2005.98 0.575 78.9067 11.8883 479.0 474.0 5.0 P 484972 PC2 2021-01-27T16:09:48 ... ZEP 2021 1 7 8 8 0 2021-01-07T08:08:00Z 2021.0173668188736 5914-99 2006.22 0.575 78.9067 11.8883 479.0 474.0 5.0 P 484973 PC2 2021-01-27T16:24:03 ... ZEP 2021 1 14 8 30 0 2021-01-14T08:30:00Z 2021.0365867579908 5303-99 1970.08 0.575 78.9067 11.8883 479.0 474.0 5.0 P 485379 PC2 2021-02-19T11:00:43 ... ZEP 2021 1 14 8 30 0 2021-01-14T08:30:00Z 2021.0365867579908 5304-99 1970.17 0.575 78.9067 11.8883 479.0 474.0 5.0 P 485380 PC2 2021-02-19T11:14:59 ... ZEP 2021 1 21 7 57 0 2021-01-21T07:57:00Z 2021.0557020547944 3405-99 1978.83 0.575 78.9067 11.8883 479.0 474.0 5.0 P 485377 PC2 2021-02-19T10:32:10 ... ZEP 2021 1 21 7 57 0 2021-01-21T07:57:00Z 2021.0557020547944 3406-99 1978.77 0.575 78.9067 11.8883 479.0 474.0 5.0 P 485378 PC2 2021-02-19T10:46:25 ... ZEP 2021 1 28 8 12 0 2021-01-28T08:12:00Z 2021.0749086757992 4059-99 1971.61 0.575 78.9067 11.8883 479.0 474.0 5.0 P 485968 PC2 2021-02-24T13:57:17 ... ZEP 2021 1 28 8 12 0 2021-01-28T08:12:00Z 2021.0749086757992 4060-99 1971.6 0.575 78.9067 11.8883 479.0 474.0 5.0 P 485969 PC2 2021-02-24T14:11:36 ... ZEP 2021 2 4 8 22 0 2021-02-04T08:22:00Z 2021.094105783866 5157-99 1969.45 0.575 78.9067 11.8883 479.0 474.0 5.0 P 485966 PC2 2021-02-24T13:28:45 ... ZEP 2021 2 4 8 22 0 2021-02-04T08:22:00Z 2021.094105783866 5158-99 1969.54 0.575 78.9067 11.8883 479.0 474.0 5.0 P 485967 PC2 2021-02-24T13:43:01 ... ZEP 2021 2 11 9 13 0 2021-02-11T09:13:00Z 2021.1133808980212 4723-99 1974.98 0.575 78.9067 11.8883 479.0 474.0 5.0 P 486710 PC2 2021-03-10T16:59:20 ... ZEP 2021 2 11 9 13 0 2021-02-11T09:13:00Z 2021.1133808980212 4724-99 1974.9 0.575 78.9067 11.8883 479.0 474.0 5.0 P 486711 PC2 2021-03-10T17:13:38 ... ZEP 2021 2 18 8 6 0 2021-02-18T08:06:00Z 2021.1324315068493 3837-99 1977.07 0.575 78.9067 11.8883 479.0 474.0 5.0 P 486708 PC2 2021-03-10T16:30:48 ... ZEP 2021 2 18 8 6 0 2021-02-18T08:06:00Z 2021.1324315068493 3838-99 1977.32 0.575 78.9067 11.8883 479.0 474.0 5.0 P 486709 PC2 2021-03-10T16:45:04 ... ZEP 2021 2 25 9 10 0 2021-02-25T09:10:00Z 2021.1517313546424 4085-99 1973.29 0.575 78.9067 11.8883 479.0 474.0 5.0 P 487034 PC2 2021-03-25T13:23:01 ... ZEP 2021 2 25 9 10 0 2021-02-25T09:10:00Z 2021.1517313546424 4086-99 1973.16 0.575 78.9067 11.8883 479.0 474.0 5.0 P 487035 PC2 2021-03-25T13:37:17 ... ZEP 2021 3 4 9 4 0 2021-03-04T09:04:00Z 2021.170898021309 5875-99 2003.27 0.575 78.9067 11.8883 479.0 474.0 5.0 P 487032 PC2 2021-03-25T13:51:33 ... ZEP 2021 3 4 9 4 0 2021-03-04T09:04:00Z 2021.170898021309 5876-99 2003.31 0.575 78.9067 11.8883 479.0 474.0 5.0 P 487033 PC2 2021-03-25T14:05:54 ... ZEP 2021 3 11 8 17 0 2021-03-11T08:17:00Z 2021.1899866818874 5537-99 1984.02 0.575 78.9067 11.8883 479.0 474.0 5.0 P 488053 PC2 2021-04-26T16:50:31 ... ZEP 2021 3 11 8 17 0 2021-03-11T08:17:00Z 2021.1899866818874 5538-99 1984.09 0.575 78.9067 11.8883 479.0 474.0 5.0 P 488054 PC2 2021-04-26T17:04:53 ... ZEP 2021 3 18 8 13 0 2021-03-18T08:13:00Z 2021.2091571537292 2241-99 1988.34 0.575 78.9067 11.8883 479.0 474.0 5.0 P 488057 PC2 2021-04-26T16:21:58 ... ZEP 2021 3 18 8 13 0 2021-03-18T08:13:00Z 2021.2091571537292 2242-99 1988.51 0.575 78.9067 11.8883 479.0 474.0 5.0 P 488058 PC2 2021-04-26T16:36:15 ... ZEP 2021 3 25 9 32 0 2021-03-25T09:32:00Z 2021.2284855403348 5695-99 1985.37 0.575 78.9067 11.8883 479.0 474.0 5.0 P 488468 PC2 2021-05-04T11:38:16 ... ZEP 2021 3 25 9 32 0 2021-03-25T09:32:00Z 2021.2284855403348 5696-99 1985.5 0.575 78.9067 11.8883 479.0 474.0 5.0 P 488469 PC2 2021-05-04T11:53:00 ... ZEP 2021 4 1 6 53 0 2021-04-01T06:53:00Z 2021.247361111111 5117-99 1987.73 0.575 78.9067 11.8883 479.0 474.0 5.0 P 488466 PC2 2021-05-04T11:08:39 ... ZEP 2021 4 1 6 53 0 2021-04-01T06:53:00Z 2021.247361111111 5118-99 1987.61 0.575 78.9067 11.8883 479.0 474.0 5.0 P 488467 PC2 2021-05-04T11:23:30 ... ZEP 2021 4 8 7 39 0 2021-04-08T07:39:00Z 2021.2666267123288 4029-99 1993.95 0.575 78.9067 11.8883 479.0 474.0 5.0 P 488678 PC2 2021-05-13T14:30:17 ... ZEP 2021 4 8 7 39 0 2021-04-08T07:39:00Z 2021.2666267123288 4030-99 1993.81 0.575 78.9067 11.8883 479.0 474.0 5.0 P 488679 PC2 2021-05-13T14:45:07 ... ZEP 2021 4 15 7 34 0 2021-04-15T07:34:00Z 2021.285795281583 5733-99 1981.26 0.575 78.9067 11.8883 479.0 474.0 5.0 P 488680 PC2 2021-05-13T14:00:29 ... ZEP 2021 4 15 7 34 0 2021-04-15T07:34:00Z 2021.285795281583 5734-99 1981.33 0.575 78.9067 11.8883 479.0 474.0 5.0 P 488681 PC2 2021-05-13T14:15:24 ... ZEP 2021 4 22 7 40 0 2021-04-22T07:40:00Z 2021.3049847793 5687-99 1983.7 0.575 78.9067 11.8883 479.0 474.0 5.0 P 489459 PC2 2021-06-09T10:27:41 ... ZEP 2021 4 22 7 40 0 2021-04-22T07:40:00Z 2021.3049847793 5688-99 1983.52 0.575 78.9067 11.8883 479.0 474.0 5.0 P 489460 PC2 2021-06-09T10:42:29 ... ZEP 2021 4 29 7 11 0 2021-04-29T07:11:00Z 2021.3241076864535 2805-99 1982.56 0.575 78.9067 11.8883 479.0 474.0 5.0 P 489461 PC2 2021-06-09T10:57:19 ... ZEP 2021 4 29 7 11 0 2021-04-29T07:11:00Z 2021.3241076864535 2806-99 1982.59 0.575 78.9067 11.8883 479.0 474.0 5.0 P 489462 PC2 2021-06-09T11:12:08 ... ZEP 2021 5 6 6 57 0 2021-05-06T06:57:00Z 2021.3432591324201 229-99 1976.59 0.575 78.9067 11.8883 479.0 474.0 5.0 P 490231 PC2 2021-06-29T12:53:12 ... ZEP 2021 5 6 6 57 0 2021-05-06T06:57:00Z 2021.3432591324201 230-99 1976.48 0.575 78.9067 11.8883 479.0 474.0 5.0 P 490232 PC2 2021-06-29T13:08:03 ... ZEP 2021 5 13 6 47 0 2021-05-13T06:47:00Z 2021.3624181887367 3133-99 1974.16 0.575 78.9067 11.8883 479.0 474.0 5.0 P 490178 PC2 2021-06-23T12:31:06 ... ZEP 2021 5 13 6 47 0 2021-05-13T06:47:00Z 2021.3624181887367 3134-99 1973.97 0.575 78.9067 11.8883 479.0 474.0 5.0 P 490179 PC2 2021-06-23T12:45:50 ... ZEP 2021 5 20 7 18 0 2021-05-20T07:18:00Z 2021.3816552511416 5829-99 1964.58 0.575 78.9067 11.8883 479.0 474.0 5.0 P 490533 PC2 2021-07-14T15:35:34 ... ZEP 2021 5 20 7 18 0 2021-05-20T07:18:00Z 2021.3816552511416 5830-99 1964.78 0.575 78.9067 11.8883 479.0 474.0 5.0 P 490534 PC2 2021-07-14T15:50:41 ... ZEP 2021 5 27 7 29 0 2021-05-27T07:29:00Z 2021.400854261796 129-99 1964.05 0.575 78.9067 11.8883 479.0 474.0 5.0 P 490519 PC2 2021-07-14T11:12:20 ... ZEP 2021 5 27 7 29 0 2021-05-27T07:29:00Z 2021.400854261796 130-99 1963.89 0.575 78.9067 11.8883 479.0 474.0 5.0 P 490520 PC2 2021-07-14T11:27:22 ... ZEP 2021 6 3 9 25 0 2021-06-03T09:25:00Z 2021.42025304414 3575-99 1962.6 0.575 78.9067 11.8883 479.0 474.0 5.0 P 490934 PC2 2021-07-26T12:39:47 ... ZEP 2021 6 3 9 25 0 2021-06-03T09:25:00Z 2021.42025304414 3576-99 1962.6 0.575 78.9067 11.8883 479.0 474.0 5.0 P 490935 PC2 2021-07-26T12:54:54 ... ZEP 2021 6 10 7 14 0 2021-06-10T07:14:00Z 2021.4391818873669 2711-99 1973.31 0.575 78.9067 11.8883 479.0 474.0 5.0 P 490936 PC2 2021-07-17T12:05:10 ... ZEP 2021 6 10 7 14 0 2021-06-10T07:14:00Z 2021.4391818873669 2712-99 1973.35 0.575 78.9067 11.8883 479.0 474.0 5.0 P 490937 PC2 2021-07-17T12:19:55 ... ZEP 2021 6 17 7 37 0 2021-06-17T07:37:00Z 2021.4584037290715 5881-99 1966.93 0.575 78.9067 11.8883 479.0 474.0 5.0 P 492192 PC2 2021-08-09T13:35:01 ... ZEP 2021 6 17 7 37 0 2021-06-17T07:37:00Z 2021.4584037290715 5882-99 1966.85 0.575 78.9067 11.8883 479.0 474.0 5.0 P 492193 PC2 2021-08-09T13:50:00 ... ZEP 2021 6 24 7 25 0 2021-06-24T07:25:00Z 2021.4775589802132 1393-99 1955.34 0.575 78.9067 11.8883 479.0 474.0 5.0 P 492194 PC2 2021-08-09T13:20:07 ... ZEP 2021 6 24 7 25 0 2021-06-24T07:25:00Z 2021.4775589802132 1394-99 1955.25 0.575 78.9067 11.8883 479.0 474.0 5.0 P 492195 PC2 2021-08-09T13:05:15 ... ZEP 2021 7 1 8 24 0 2021-07-01T08:24:00Z 2021.4968493150684 4645-99 1951.45 0.575 78.9067 11.8883 479.0 474.0 5.0 P 492466 PC2 2021-08-17T11:56:45 ... ZEP 2021 7 1 8 24 0 2021-07-01T08:24:00Z 2021.4968493150684 4646-99 1951.33 0.575 78.9067 11.8883 479.0 474.0 5.0 P 492467 PC2 2021-08-17T12:11:30 ... ZEP 2021 7 8 7 27 0 2021-07-08T07:27:00Z 2021.5159189497717 2363-99 1948.83 0.575 78.9067 11.8883 479.0 474.0 5.0 P 492468 PC2 2021-08-17T12:26:15 ... ZEP 2021 7 8 7 27 0 2021-07-08T07:27:00Z 2021.5159189497717 2364-99 1948.99 0.575 78.9067 11.8883 479.0 474.0 5.0 P 492469 PC2 2021-08-17T12:40:59 ... ZEP 2021 7 15 8 40 0 2021-07-15T08:40:00Z 2021.5352359208523 3401-99 1953.23 0.575 78.9067 11.8883 479.0 474.0 5.0 P 492679 PC2 2021-08-20T09:02:40 ... ZEP 2021 7 15 8 40 0 2021-07-15T08:40:00Z 2021.5352359208523 3402-99 1953.25 0.575 78.9067 11.8883 479.0 474.0 5.0 P 492680 PC2 2021-08-20T09:17:46 ... ZEP 2021 7 22 7 42 0 2021-07-22T07:42:00Z 2021.554303652968 2113-99 1969.26 0.575 78.9067 11.8883 479.0 474.0 5.0 P 492681 PC2 2021-08-20T08:32:33 ... ZEP 2021 7 22 7 42 0 2021-07-22T07:42:00Z 2021.554303652968 2114-99 1968.92 0.575 78.9067 11.8883 479.0 474.0 5.0 P 492682 PC2 2021-08-20T08:47:38 ... ZEP 2021 7 29 6 59 0 2021-07-29T06:59:00Z 2021.5733999238964 5757-99 1956.84 0.575 78.9067 11.8883 479.0 474.0 5.0 P 493322 PC2 2021-08-26T13:19:15 ... ZEP 2021 7 29 6 59 0 2021-07-29T06:59:00Z 2021.5733999238964 5758-99 1956.89 0.575 78.9067 11.8883 479.0 474.0 5.0 P 493323 PC2 2021-08-26T13:34:03 ... ZEP 2021 8 5 7 22 0 2021-08-05T07:22:00Z 2021.5926217656013 175-99 1970.04 0.575 78.9067 11.8883 479.0 474.0 5.0 P 493324 PC2 2021-08-26T13:48:57 ... ZEP 2021 8 5 7 22 0 2021-08-05T07:22:00Z 2021.5926217656013 176-99 1970.11 0.575 78.9067 11.8883 479.0 474.0 5.0 P 493325 PC2 2021-08-26T14:03:47 ... ZEP 2021 8 12 7 50 0 2021-08-12T07:50:00Z 2021.6118531202435 2925-99 1962.29 0.575 78.9067 11.8883 479.0 474.0 5.0 P 494175 PC2 2021-09-20T16:42:37 ... ZEP 2021 8 12 7 50 0 2021-08-12T07:50:00Z 2021.6118531202435 2926-99 1962.22 0.575 78.9067 11.8883 479.0 474.0 5.0 P 494176 PC2 2021-09-20T16:57:07 ... ZEP 2021 8 19 6 58 0 2021-08-19T06:58:00Z 2021.6309322678844 5555-99 1961.01 0.575 78.9067 11.8883 479.0 474.0 5.0 P 494177 PC2 2021-09-20T16:13:36 ... ZEP 2021 8 19 6 58 0 2021-08-19T06:58:00Z 2021.6309322678844 5556-99 1960.97 0.575 78.9067 11.8883 479.0 474.0 5.0 P 494178 PC2 2021-09-20T16:28:06 ... ZEP 2021 8 26 7 20 0 2021-08-26T07:20:00Z 2021.6501522070016 5473-99 1962.45 0.575 78.9067 11.8883 479.0 474.0 5.0 P 494429 PC2 2021-09-22T11:56:47 ... ZEP 2021 8 26 7 20 0 2021-08-26T07:20:00Z 2021.6501522070016 5474-99 1962.33 0.575 78.9067 11.8883 479.0 474.0 5.0 P 494430 PC2 2021-09-22T12:11:07 ... ZEP 2021 9 2 7 45 0 2021-09-02T07:45:00Z 2021.6693778538813 4327-99 1983.65 0.575 78.9067 11.8883 479.0 474.0 5.0 P 494427 PC2 2021-09-22T11:28:02 ... ZEP 2021 9 2 7 45 0 2021-09-02T07:45:00Z 2021.6693778538813 4328-99 1983.87 0.575 78.9067 11.8883 479.0 474.0 5.0 P 494428 PC2 2021-09-22T11:42:26 ... ZEP 2021 9 9 7 19 0 2021-09-09T07:19:00Z 2021.6885064687976 5361-99 2007.48 0.575 78.9067 11.8883 479.0 474.0 5.0 P 494862 PC2 2021-10-07T12:33:40 ... ZEP 2021 9 9 7 19 0 2021-09-09T07:19:00Z 2021.6885064687976 5362-99 2007.47 0.575 78.9067 11.8883 479.0 474.0 5.0 P 494863 PC2 2021-10-07T12:48:07 ... ZEP 2021 9 17 7 32 0 2021-09-17T07:32:00Z 2021.7104490106544 3629-99 1978.52 0.575 78.9067 11.8883 479.0 474.0 5.0 P 494864 PC2 2021-10-07T13:02:33 ... ZEP 2021 9 17 7 32 0 2021-09-17T07:32:00Z 2021.7104490106544 3630-99 1978.53 0.575 78.9067 11.8883 479.0 474.0 5.0 P 494865 PC2 2021-10-07T13:16:56 ... ZEP 2021 9 23 8 13 0 2021-09-23T08:13:00Z 2021.7269653729072 2197-99 1981.79 0.575 78.9067 11.8883 479.0 474.0 5.0 P 495681 PC2 2021-10-20T14:45:58 ... ZEP 2021 9 23 8 13 0 2021-09-23T08:13:00Z 2021.7269653729072 2198-99 1981.96 0.575 78.9067 11.8883 479.0 474.0 5.0 P 495682 PC2 2021-10-20T15:00:14 ... ZEP 2021 9 30 7 6 0 2021-09-30T07:06:00Z 2021.7460159817351 3293-99 1989.15 0.575 78.9067 11.8883 479.0 474.0 5.0 P 495679 PC2 2021-10-20T15:14:34 ... ZEP 2021 9 30 7 6 0 2021-09-30T07:06:00Z 2021.7460159817351 3294-99 1989.17 0.575 78.9067 11.8883 479.0 474.0 5.0 P 495680 PC2 2021-10-20T15:28:53 ... ZEP 2021 10 7 7 40 0 2021-10-07T07:40:00Z 2021.7652587519026 4639-99 1985.74 0.575 78.9067 11.8883 479.0 474.0 5.0 P 496069 PC2 2021-11-01T12:57:05 ... ZEP 2021 10 7 7 40 0 2021-10-07T07:40:00Z 2021.7652587519026 4640-99 1985.78 0.575 78.9067 11.8883 479.0 474.0 5.0 P 496070 PC2 2021-11-01T13:11:24 ... ZEP 2021 10 14 7 20 0 2021-10-14T07:20:00Z 2021.784398782344 5755-99 1984.3 0.575 78.9067 11.8883 479.0 474.0 5.0 P 496071 PC2 2021-11-01T12:28:29 ... ZEP 2021 10 14 7 20 0 2021-10-14T07:20:00Z 2021.784398782344 5756-99 1984.23 0.575 78.9067 11.8883 479.0 474.0 5.0 P 496072 PC2 2021-11-01T12:42:47 ... ZEP 2021 10 21 7 38 0 2021-10-21T07:38:00Z 2021.8036111111112 5909-99 1994.82 0.575 78.9067 11.8883 479.0 474.0 5.0 P 497164 PC2 2021-12-02T12:59:36 ... ZEP 2021 10 21 7 38 0 2021-10-21T07:38:00Z 2021.8036111111112 5910-99 1994.94 0.575 78.9067 11.8883 479.0 474.0 5.0 P 497165 PC2 2021-12-02T13:13:50 ... ZEP 2021 10 28 8 7 0 2021-10-28T08:07:00Z 2021.8228443683408 1555-99 1987.43 0.575 78.9067 11.8883 479.0 474.0 5.0 P 497166 PC2 2021-12-02T12:02:27 ... ZEP 2021 10 28 8 7 0 2021-10-28T08:07:00Z 2021.8228443683408 1556-99 1987.45 0.575 78.9067 11.8883 479.0 474.0 5.0 P 497167 PC2 2021-12-02T12:16:46 ... ZEP 2021 11 4 9 36 0 2021-11-04T09:36:00Z 2021.8421917808218 4513-99 1990.73 0.575 78.9067 11.8883 479.0 474.0 5.0 P 497246 PC2 2021-12-06T13:04:13 ... ZEP 2021 11 4 9 36 0 2021-11-04T09:36:00Z 2021.8421917808218 471-99 1990.83 0.575 78.9067 11.8883 479.0 474.0 5.0 P 497247 PC2 2021-12-06T13:18:30 ... ZEP 2021 11 11 8 35 0 2021-11-11T08:35:00Z 2021.861253805175 1038-99 1998.87 0.575 78.9067 11.8883 479.0 474.0 5.0 P 497244 PC2 2021-12-06T12:35:40 ... ZEP 2021 11 11 8 35 0 2021-11-11T08:35:00Z 2021.861253805175 586-99 1999.0 0.575 78.9067 11.8883 479.0 474.0 5.0 P 497245 PC2 2021-12-06T12:49:57 ... ZEP 2021 11 19 9 5 0 2021-11-19T09:05:00Z 2021.88322869102 3963-99 2002.1 0.575 78.9067 11.8883 479.0 474.0 5.0 P 497981 PC2 2021-12-23T13:37:14 ... ZEP 2021 11 19 9 5 0 2021-11-19T09:05:00Z 2021.88322869102 3964-99 2001.84 0.575 78.9067 11.8883 479.0 474.0 5.0 P 497982 PC2 2021-12-23T13:51:30 ... ZEP 2021 11 25 12 34 56 2021-11-25T12:34:56Z 2021.900066463724 2041-99 2020.32 0.575 78.9067 11.8883 479.0 474.0 5.0 P 497983 PC2 2021-12-23T11:14:26 ... ZEP 2021 11 25 12 34 56 2021-11-25T12:34:56Z 2021.900066463724 2042-99 2020.19 0.575 78.9067 11.8883 479.0 474.0 5.0 P 497984 PC2 2021-12-23T11:28:46 ... ZEP 2021 12 2 8 12 0 2021-12-02T08:12:00Z 2021.9187442922375 1481-99 2003.47 0.575 78.9067 11.8883 479.0 474.0 5.0 P 498574 PC2 2022-01-13T15:44:02 ... ZEP 2021 12 2 8 12 0 2021-12-02T08:12:00Z 2021.9187442922375 1728-99 2003.44 0.575 78.9067 11.8883 479.0 474.0 5.0 P 498575 PC2 2022-01-13T15:58:19 ... ZEP 2021 12 9 7 46 0 2021-12-09T07:46:00Z 2021.9378729071536 489-99 2004.76 0.575 78.9067 11.8883 479.0 474.0 5.0 P 498576 PC2 2022-01-13T15:15:28 ... ZEP 2021 12 9 7 46 0 2021-12-09T07:46:00Z 2021.9378729071536 5570-99 2004.74 0.575 78.9067 11.8883 479.0 474.0 5.0 P 498577 PC2 2022-01-13T15:29:45 ... ZEP 2021 12 16 8 25 0 2021-12-16T08:25:00Z 2021.9571251902587 1664-99 2010.19 0.575 78.9067 11.8883 479.0 474.0 5.0 P 502800 PC2 2022-04-29T13:12:27 ... ZEP 2021 12 16 8 25 0 2021-12-16T08:25:00Z 2021.9571251902587 392-99 2010.12 0.575 78.9067 11.8883 479.0 474.0 5.0 P 502801 PC2 2022-04-29T13:26:45 ... ZEP 2021 12 23 8 12 0 2021-12-23T08:12:00Z 2021.9762785388127 2476-99 2006.31 0.575 78.9067 11.8883 479.0 474.0 5.0 P 502818 PC2 2022-04-29T10:48:44 ... ZEP 2021 12 23 8 12 0 2021-12-23T08:12:00Z 2021.9762785388127 5610-99 2006.31 0.575 78.9067 11.8883 479.0 474.0 5.0 P 502819 PC2 2022-04-29T11:03:02 ... ZEP 2021 12 30 7 41 0 2021-12-30T07:41:00Z 2021.9953976407915 61-99 2019.37 0.575 78.9067 11.8883 479.0 474.0 5.0 P 499382 PC2 2022-02-01T15:10:03 ... ZEP 2021 12 30 7 41 0 2021-12-30T07:41:00Z 2021.9953976407915 62-99 2019.5 0.575 78.9067 11.8883 479.0 474.0 5.0 P 499383 PC2 2022-02-01T15:24:18 ... ZEP 2022 1 6 8 37 0 2022-01-06T08:37:00Z 2022.0146822678844 3683-99 2009.92 0.575 78.9067 11.8883 479.0 474.0 5.0 P 499384 PC2 2022-02-01T15:38:33 ... ZEP 2022 1 6 8 37 0 2022-01-06T08:37:00Z 2022.0146822678844 3684-99 2009.94 0.575 78.9067 11.8883 479.0 474.0 5.0 P 499385 PC2 2022-02-01T15:52:48 ... ZEP 2022 1 13 8 40 0 2022-01-13T08:40:00Z 2022.0338660578386 4973-99 1998.12 0.575 78.9067 11.8883 479.0 474.0 5.0 P 500001 PC2 2022-02-22T15:32:00 ... ZEP 2022 1 13 8 40 0 2022-01-13T08:40:00Z 2022.0338660578386 4974-99 1997.99 0.575 78.9067 11.8883 479.0 474.0 5.0 P 500002 PC2 2022-02-22T15:46:15 ... ZEP 2022 1 20 7 52 0 2022-01-20T07:52:00Z 2022.0529528158295 3487-99 2022.99 0.575 78.9067 11.8883 479.0 474.0 5.0 P 499999 PC2 2022-02-22T16:00:30 ... ZEP 2022 1 20 7 52 0 2022-01-20T07:52:00Z 2022.0529528158295 3488-99 2023.06 0.575 78.9067 11.8883 479.0 474.0 5.0 P 500000 PC2 2022-02-22T16:14:45 ... ZEP 2022 1 27 8 23 0 2022-01-27T08:23:00Z 2022.0721898782344 5881-99 2052.1 0.575 78.9067 11.8883 479.0 474.0 5.0 P 500870 PC2 2022-03-11T12:36:26 .S. ZEP 2022 1 27 8 23 0 2022-01-27T08:23:00Z 2022.0721898782344 5882-99 2052.48 0.575 78.9067 11.8883 479.0 474.0 5.0 P 500871 PC2 2022-03-11T12:50:41 .S. ZEP 2022 2 3 8 46 0 2022-02-03T08:46:00Z 2022.091411719939 1393-99 1995.38 0.575 78.9067 11.8883 479.0 474.0 5.0 P 500868 PC2 2022-03-11T12:07:54 ... ZEP 2022 2 3 8 46 0 2022-02-03T08:46:00Z 2022.091411719939 1394-99 1995.33 0.575 78.9067 11.8883 479.0 474.0 5.0 P 500869 PC2 2022-03-11T12:22:10 ... ZEP 2022 2 10 8 33 0 2022-02-10T08:33:00Z 2022.110565068493 5747-99 2007.66 0.575 78.9067 11.8883 479.0 474.0 5.0 P 500992 PC2 2022-03-16T16:48:00 ... ZEP 2022 2 10 8 33 0 2022-02-10T08:33:00Z 2022.110565068493 5748-99 2007.66 0.575 78.9067 11.8883 479.0 474.0 5.0 P 500993 PC2 2022-03-16T17:02:18 ... ZEP 2022 2 17 8 23 0 2022-02-17T08:23:00Z 2022.1297241248099 3101-99 2007.63 0.575 78.9067 11.8883 479.0 474.0 5.0 P 500994 PC2 2022-03-16T16:19:19 ... ZEP 2022 2 17 8 23 0 2022-02-17T08:23:00Z 2022.1297241248099 3102-99 2007.78 0.575 78.9067 11.8883 479.0 474.0 5.0 P 500995 PC2 2022-03-16T16:33:40 ... ZEP 2022 2 24 8 50 0 2022-02-24T08:50:00Z 2022.1489535768646 3515-99 2007.41 0.575 78.9067 11.8883 479.0 474.0 5.0 P 502331 PC2 2022-04-14T11:33:27 ... ZEP 2022 2 24 8 50 0 2022-02-24T08:50:00Z 2022.1489535768646 3516-99 2007.44 0.575 78.9067 11.8883 479.0 474.0 5.0 P 502332 PC2 2022-04-14T11:47:45 ... ZEP 2022 3 3 8 31 0 2022-03-03T08:31:00Z 2022.1680955098934 5303-99 2022.22 0.575 78.9067 11.8883 479.0 474.0 5.0 P 502329 PC2 2022-04-14T11:04:52 ... ZEP 2022 3 3 8 31 0 2022-03-03T08:31:00Z 2022.1680955098934 5304-99 2022.75 0.575 78.9067 11.8883 479.0 474.0 5.0 P 502330 PC2 2022-04-14T11:19:09 ... ZEP 2022 3 10 9 35 0 2022-03-10T09:35:00Z 2022.1873953576865 5561-99 1999.04 0.575 78.9067 11.8883 479.0 474.0 5.0 P 502041 PC2 2022-04-12T14:54:56 ... ZEP 2022 3 10 9 35 0 2022-03-10T09:35:00Z 2022.1873953576865 5562-99 1999.11 0.575 78.9067 11.8883 479.0 474.0 5.0 P 502042 PC2 2022-04-12T15:09:13 ... ZEP 2022 3 17 7 32 0 2022-03-17T07:32:00Z 2022.2063394216134 4937-99 1996.61 0.575 78.9067 11.8883 479.0 474.0 5.0 P 502043 PC2 2022-04-12T14:26:21 ... ZEP 2022 3 17 7 32 0 2022-03-17T07:32:00Z 2022.2063394216134 4938-99 1996.64 0.575 78.9067 11.8883 479.0 474.0 5.0 P 502044 PC2 2022-04-12T14:40:39 ... ZEP 2022 3 31 7 29 0 2022-03-31T07:29:00Z 2022.2446898782343 2273-99 2007.58 0.575 78.9067 11.8883 479.0 474.0 5.0 P 503364 PC2 2022-05-26T16:18:27 ... ZEP 2022 3 31 7 29 0 2022-03-31T07:29:00Z 2022.2446898782343 2274-99 2007.49 0.575 78.9067 11.8883 479.0 474.0 5.0 P 503365 PC2 2022-05-26T16:32:50 ... ZEP 2022 4 7 7 40 0 2022-04-07T07:40:00Z 2022.263888888889 1667-99 2011.08 0.575 78.9067 11.8883 479.0 474.0 5.0 P 503366 PC2 2022-05-27T08:36:33 ... ZEP 2022 4 7 7 40 0 2022-04-07T07:40:00Z 2022.263888888889 1668-99 2011.07 0.575 78.9067 11.8883 479.0 474.0 5.0 P 503367 PC2 2022-05-27T08:50:56 ... ZEP 2022 4 14 6 35 0 2022-04-14T06:35:00Z 2022.282943302892 5883-99 1996.25 0.575 78.9067 11.8883 479.0 474.0 5.0 P 504143 PC2 2022-06-10T11:12:24 ... ZEP 2022 4 14 6 35 0 2022-04-14T06:35:00Z 2022.282943302892 5884-99 1996.36 0.575 78.9067 11.8883 479.0 474.0 5.0 P 504144 PC2 2022-06-10T11:26:56 ... ZEP 2022 4 21 12 34 56 2022-04-21T12:34:56Z 2022.3028061897514 3411-99 1998.81 0.575 78.9067 11.8883 479.0 474.0 5.0 P 504157 PC2 2022-06-10T10:43:22 ... ZEP 2022 4 21 12 34 56 2022-04-21T12:34:56Z 2022.3028061897514 3412-99 1998.8 0.575 78.9067 11.8883 479.0 474.0 5.0 P 504158 PC2 2022-06-10T10:57:53 ... ZEP 2022 4 28 7 14 0 2022-04-28T07:14:00Z 2022.3213736681887 4557-99 1998.89 0.575 78.9067 11.8883 479.0 474.0 5.0 P 504207 PC2 2022-06-13T16:22:53 ... ZEP 2022 4 28 7 14 0 2022-04-28T07:14:00Z 2022.3213736681887 4558-99 1999.06 0.575 78.9067 11.8883 479.0 474.0 5.0 P 504208 PC2 2022-06-13T16:37:54 ... ZEP 2022 5 5 7 10 0 2022-05-05T07:10:00Z 2022.3405441400305 1057-99 1990.17 0.575 78.9067 11.8883 479.0 474.0 5.0 P 504205 PC2 2022-06-13T15:53:01 ... ZEP 2022 5 5 7 10 0 2022-05-05T07:10:00Z 2022.3405441400305 1058-99 1990.32 0.575 78.9067 11.8883 479.0 474.0 5.0 P 504206 PC2 2022-06-13T16:07:57 ... ZEP 2022 5 12 7 46 0 2022-05-12T07:46:00Z 2022.3597907153728 3293-99 1996.08 0.575 78.9067 11.8883 479.0 474.0 5.0 P 505215 PC2 2022-06-27T10:48:41 ... ZEP 2022 5 12 7 46 0 2022-05-12T07:46:00Z 2022.3597907153728 3294-99 1996.0 0.575 78.9067 11.8883 479.0 474.0 5.0 P 505216 PC2 2022-06-27T11:03:44 ... ZEP 2022 5 19 8 43 0 2022-05-19T08:43:00Z 2022.3790772450532 175-99 1986.53 0.575 78.9067 11.8883 479.0 474.0 5.0 P 505213 PC2 2022-06-27T10:18:44 ... ZEP 2022 5 19 8 43 0 2022-05-19T08:43:00Z 2022.3790772450532 176-99 1986.63 0.575 78.9067 11.8883 479.0 474.0 5.0 P 505214 PC2 2022-06-27T10:33:39 ... ZEP 2022 5 26 7 6 0 2022-05-26T07:06:00Z 2022.3980707762557 4639-99 1988.3 0.575 78.9067 11.8883 479.0 474.0 5.0 P 505680 PC2 2022-07-06T11:31:13 ... ZEP 2022 5 26 7 6 0 2022-05-26T07:06:00Z 2022.3980707762557 4640-99 1988.13 0.575 78.9067 11.8883 479.0 474.0 5.0 P 505681 PC2 2022-07-06T11:46:17 ... ZEP 2022 6 2 7 26 0 2022-06-02T07:26:00Z 2022.4172869101978 5859-99 1988.75 0.575 78.9067 11.8883 479.0 474.0 5.0 P 505682 PC2 2022-07-06T12:01:13 ... ZEP 2022 6 2 7 26 0 2022-06-02T07:26:00Z 2022.4172869101978 5860-99 1988.67 0.575 78.9067 11.8883 479.0 474.0 5.0 P 505683 PC2 2022-07-06T12:16:11 ... ZEP 2022 6 9 7 11 0 2022-06-09T07:11:00Z 2022.4364364535768 4509-99 1989.81 0.575 78.9067 11.8883 479.0 474.0 5.0 P 506261 PC2 2022-07-14T11:59:29 ... ZEP 2022 6 9 7 11 0 2022-06-09T07:11:00Z 2022.4364364535768 4968-99 1989.67 0.575 78.9067 11.8883 479.0 474.0 5.0 P 506262 PC2 2022-07-14T11:44:43 ... ZEP 2022 6 16 7 15 0 2022-06-16T07:15:00Z 2022.4556221461187 1301-99 1978.54 0.575 78.9067 11.8883 479.0 474.0 5.0 P 506263 PC2 2022-07-14T10:45:28 ... ZEP 2022 6 16 7 15 0 2022-06-16T07:15:00Z 2022.4556221461187 760-99 1978.48 0.575 78.9067 11.8883 479.0 474.0 5.0 P 506264 PC2 2022-07-14T11:00:20 ... ZEP 2022 6 23 7 30 0 2022-06-23T07:30:00Z 2022.4748287671232 2156-99 1973.01 0.575 78.9067 11.8883 479.0 474.0 5.0 P 506569 PC2 2022-07-28T15:30:17 ... ZEP 2022 6 23 7 30 0 2022-06-23T07:30:00Z 2022.4748287671232 655-99 1972.97 0.575 78.9067 11.8883 479.0 474.0 5.0 P 506568 PC2 2022-07-28T15:15:06 ... ZEP 2022 6 30 8 0 0 2022-06-30T08:00:00Z 2022.4940639269407 4641-99 1973.61 0.575 78.9067 11.8883 479.0 474.0 5.0 P 506570 PC2 2022-07-28T15:45:27 ... ZEP 2022 6 30 8 0 0 2022-06-30T08:00:00Z 2022.4940639269407 5596-99 1973.66 0.575 78.9067 11.8883 479.0 474.0 5.0 P 506571 PC2 2022-07-28T16:00:39 ... ZEP 2022 7 7 7 42 0 2022-07-07T07:42:00Z 2022.5132077625572 5361-99 1969.09 0.575 78.9067 11.8883 479.0 474.0 5.0 P 507259 PC2 2022-08-11T09:17:05 ... ZEP 2022 7 7 7 42 0 2022-07-07T07:42:00Z 2022.5132077625572 5362-99 1968.93 0.575 78.9067 11.8883 479.0 474.0 5.0 P 507260 PC2 2022-08-11T09:32:16 ... ZEP 2022 7 14 7 33 0 2022-07-14T07:33:00Z 2022.5323687214611 2133-99 1962.85 0.575 78.9067 11.8883 479.0 474.0 5.0 P 507261 PC2 2022-08-11T09:47:25 ... ZEP 2022 7 14 7 33 0 2022-07-14T07:33:00Z 2022.5323687214611 2134-99 1962.8 0.575 78.9067 11.8883 479.0 474.0 5.0 P 507262 PC2 2022-08-11T10:02:30 ... ZEP 2022 7 21 8 0 0 2022-07-21T08:00:00Z 2022.551598173516 3931-99 1981.07 0.575 78.9067 11.8883 479.0 474.0 5.0 P 508293 PC2 2022-09-14T14:55:25 ... ZEP 2022 7 21 8 0 0 2022-07-21T08:00:00Z 2022.551598173516 3932-99 1981.25 0.575 78.9067 11.8883 479.0 474.0 5.0 P 508294 PC2 2022-09-14T15:09:55 ... ZEP 2022 7 28 7 3 0 2022-07-28T07:03:00Z 2022.5706678082192 5427-99 1979.2 0.575 78.9067 11.8883 479.0 474.0 5.0 P 508295 PC2 2022-09-14T15:24:24 ... ZEP 2022 7 28 7 3 0 2022-07-28T07:03:00Z 2022.5706678082192 5428-99 1979.11 0.575 78.9067 11.8883 479.0 474.0 5.0 P 508296 PC2 2022-09-14T15:38:52 ... ZEP 2022 8 4 7 44 0 2022-08-04T07:44:00Z 2022.5899238964992 1764-99 1972.79 0.575 78.9067 11.8883 479.0 474.0 5.0 P 508646 PC2 2022-09-21T16:34:53 ... ZEP 2022 8 4 7 44 0 2022-08-04T07:44:00Z 2022.5899238964992 5598-99 1972.71 0.575 78.9067 11.8883 479.0 474.0 5.0 P 508647 PC2 2022-09-21T16:20:17 ... ZEP 2022 8 11 7 54 0 2022-08-11T07:54:00Z 2022.6091210045663 1797-99 1973.8 0.575 78.9067 11.8883 479.0 474.0 5.0 P 508648 PC2 2022-09-21T15:51:11 ... ZEP 2022 8 11 7 54 0 2022-08-11T07:54:00Z 2022.6091210045663 192-99 1973.6 0.575 78.9067 11.8883 479.0 474.0 5.0 P 508649 PC2 2022-09-21T16:05:37 ... ZEP 2022 8 18 7 15 0 2022-08-18T07:15:00Z 2022.6282248858447 1683-99 1970.72 0.575 78.9067 11.8883 479.0 474.0 5.0 P 508974 PC2 2022-09-28T12:02:16 ... ZEP 2022 8 18 7 15 0 2022-08-18T07:15:00Z 2022.6282248858447 1684-99 1970.65 0.575 78.9067 11.8883 479.0 474.0 5.0 P 508975 PC2 2022-09-28T12:16:56 ... ZEP 2022 8 25 8 15 0 2022-08-25T08:15:00Z 2022.6475171232876 3633-99 1977.41 0.575 78.9067 11.8883 479.0 474.0 5.0 P 508976 PC2 2022-09-28T12:31:39 ... ZEP 2022 8 25 8 15 0 2022-08-25T08:15:00Z 2022.6475171232876 3634-99 1977.43 0.575 78.9067 11.8883 479.0 474.0 5.0 P 508977 PC2 2022-09-28T12:46:23 ... ZEP 2022 9 1 8 20 0 2022-09-01T08:20:00Z 2022.6667047184171 563-99 1977.57 0.575 78.9067 11.8883 479.0 474.0 5.0 P 509250 PC2 2022-10-04T12:54:10 ... ZEP 2022 9 1 8 20 0 2022-09-01T08:20:00Z 2022.6667047184171 564-99 1977.79 0.575 78.9067 11.8883 479.0 474.0 5.0 P 509251 PC2 2022-10-04T13:08:49 ... ZEP 2022 9 8 7 7 0 2022-09-08T07:07:00Z 2022.68574391172 1859-99 1979.39 0.575 78.9067 11.8883 479.0 474.0 5.0 P 509248 PC2 2022-10-04T11:25:35 ... ZEP 2022 9 8 7 7 0 2022-09-08T07:07:00Z 2022.68574391172 1860-99 1979.61 0.575 78.9067 11.8883 479.0 474.0 5.0 P 509249 PC2 2022-10-04T11:40:25 ... ZEP 2022 9 15 7 50 0 2022-09-15T07:50:00Z 2022.705003805175 2465-99 1988.4 0.575 78.9067 11.8883 479.0 474.0 5.0 P 510130 PC2 2022-10-26T16:11:11 ... ZEP 2022 9 15 7 50 0 2022-09-15T07:50:00Z 2022.705003805175 4282-99 1988.4 0.575 78.9067 11.8883 479.0 474.0 5.0 P 510131 PC2 2022-10-26T16:25:28 ... ZEP 2022 9 21 8 21 0 2022-09-21T08:21:00Z 2022.7215011415526 373-99 2000.55 0.575 78.9067 11.8883 479.0 474.0 5.0 P 510132 PC2 2022-10-26T16:39:45 ... ZEP 2022 9 21 8 21 0 2022-09-21T08:21:00Z 2022.7215011415526 5219-99 2000.51 0.575 78.9067 11.8883 479.0 474.0 5.0 P 510133 PC2 2022-10-26T16:54:02 ... ZEP 2022 9 29 7 42 0 2022-09-29T07:42:00Z 2022.7433447488584 2428-99 1988.25 0.575 78.9067 11.8883 479.0 474.0 5.0 P 510688 PC2 2022-11-08T11:42:14 ... ZEP 2022 9 29 7 42 0 2022-09-29T07:42:00Z 2022.7433447488584 4100-99 1988.31 0.575 78.9067 11.8883 479.0 474.0 5.0 P 510689 PC2 2022-11-08T11:56:32 ... ZEP 2022 10 6 7 10 0 2022-10-06T07:10:00Z 2022.7624619482497 1023-99 2028.99 0.575 78.9067 11.8883 479.0 474.0 5.0 P 510690 PC2 2022-11-08T11:13:40 ... ZEP 2022 10 6 7 10 0 2022-10-06T07:10:00Z 2022.7624619482497 5400-99 2028.79 0.575 78.9067 11.8883 479.0 474.0 5.0 P 510691 PC2 2022-11-08T11:27:57 ... ZEP 2022 10 13 7 32 0 2022-10-13T07:32:00Z 2022.7816818873669 5831-99 2007.23 0.575 78.9067 11.8883 479.0 474.0 5.0 P 511179 PC2 2022-12-06T14:33:29 ... ZEP 2022 10 13 7 32 0 2022-10-13T07:32:00Z 2022.7816818873669 5832-99 2007.22 0.575 78.9067 11.8883 479.0 474.0 5.0 P 511180 PC2 2022-12-06T14:47:44 ... ZEP 2022 10 20 8 0 0 2022-10-20T08:00:00Z 2022.800913242009 1057-99 2023.46 0.575 78.9067 11.8883 479.0 474.0 5.0 P 511181 PC2 2022-12-06T14:04:55 ... ZEP 2022 10 20 8 0 0 2022-10-20T08:00:00Z 2022.800913242009 1058-99 2023.36 0.575 78.9067 11.8883 479.0 474.0 5.0 P 511182 PC2 2022-12-06T14:19:12 ... ZEP 2022 10 27 8 22 0 2022-10-27T08:22:00Z 2022.8201331811263 1111-99 2018.03 0.575 78.9067 11.8883 479.0 474.0 5.0 P 513429 PC2 2023-01-25T15:21:26 ... ZEP 2022 10 27 8 22 0 2022-10-27T08:22:00Z 2022.8201331811263 1112-99 2018.1 0.575 78.9067 11.8883 479.0 474.0 5.0 P 513430 PC2 2023-01-25T15:35:40 ... ZEP 2022 11 3 8 40 0 2022-11-03T08:40:00Z 2022.8393455098935 4605-99 1998.43 0.575 78.9067 11.8883 479.0 474.0 5.0 P 513428 PC2 2023-01-25T14:52:48 ... ZEP 2022 11 10 8 55 0 2022-11-10T08:55:00Z 2022.858552130898 1201-99 1997.55 0.575 78.9067 11.8883 479.0 474.0 5.0 P 513462 PC2 2023-01-25T15:49:55 ... ZEP 2022 11 10 8 55 0 2022-11-10T08:55:00Z 2022.858552130898 1202-99 1997.44 0.575 78.9067 11.8883 479.0 474.0 5.0 P 513463 PC2 2023-01-25T16:04:09 ... ZEP 2022 11 12 10 40 0 2022-11-12T10:40:00Z 2022.8642313546422 331-99 2000.8 0.575 78.9067 11.8883 479.0 474.0 5.0 P 513464 PC2 2023-01-25T16:18:24 ... ZEP 2022 11 12 10 40 0 2022-11-12T10:40:00Z 2022.8642313546422 332-99 2000.93 0.575 78.9067 11.8883 479.0 474.0 5.0 P 513465 PC2 2023-01-25T16:32:38 ... ZEP 2022 11 24 8 18 0 2022-11-24T08:18:00Z 2022.8968378995435 5565-99 1996.65 0.575 78.9067 11.8883 479.0 474.0 5.0 P 512668 PC2 2023-01-05T15:45:00 ... ZEP 2022 11 24 8 18 0 2022-11-24T08:18:00Z 2022.8968378995435 5566-99 1996.83 0.575 78.9067 11.8883 479.0 474.0 5.0 P 512669 PC2 2023-01-05T15:59:17 ... ZEP 2022 12 1 8 28 0 2022-12-01T08:28:00Z 2022.9160350076104 5367-99 1999.99 0.575 78.9067 11.8883 479.0 474.0 5.0 P 512670 PC2 2023-01-05T16:13:32 ... ZEP 2022 12 1 8 28 0 2022-12-01T08:28:00Z 2022.9160350076104 5368-99 1999.82 0.575 78.9067 11.8883 479.0 474.0 5.0 P 512671 PC2 2023-01-05T16:27:49 ... ZEP 2022 12 8 8 4 0 2022-12-08T08:04:00Z 2022.9351674277016 2578-99 2003.68 0.575 78.9067 11.8883 479.0 474.0 5.0 P 513194 PC2 2023-01-12T13:37:55 ... ZEP 2022 12 8 8 4 0 2022-12-08T08:04:00Z 2022.9351674277016 5101-99 2003.54 0.575 78.9067 11.8883 479.0 474.0 5.0 P 513193 PC2 2023-01-12T13:23:37 ... ZEP 2022 12 15 8 12 0 2022-12-15T08:12:00Z 2022.9543607305936 4089-99 2010.24 0.575 78.9067 11.8883 479.0 474.0 5.0 P 513196 PC2 2023-01-12T14:06:31 ... ZEP 2022 12 15 8 12 0 2022-12-15T08:12:00Z 2022.9543607305936 833-99 2010.14 0.575 78.9067 11.8883 479.0 474.0 5.0 P 513195 PC2 2023-01-12T13:52:13 ... ZEP 2022 12 22 9 20 0 2022-12-22T09:20:00Z 2022.9736681887366 4981-99 2011.0 0.575 78.9067 11.8883 479.0 474.0 5.0 P 514126 PC2 2023-02-27T12:40:48 ... ZEP 2022 12 22 9 20 0 2022-12-22T09:20:00Z 2022.9736681887366 4982-99 2010.78 0.575 78.9067 11.8883 479.0 474.0 5.0 P 514127 PC2 2023-02-27T12:55:06 ... ZEP 2022 12 29 12 55 0 2022-12-29T12:55:00Z 2022.9932553272452 1541-99 2030.1 0.575 78.9067 11.8883 479.0 474.0 5.0 P 514128 PC2 2023-02-27T13:09:24 ... ZEP 2022 12 29 12 55 0 2022-12-29T12:55:00Z 2022.9932553272452 1542-99 2029.83 0.575 78.9067 11.8883 479.0 474.0 5.0 P 514129 PC2 2023-02-27T13:23:46 ...