# number_of_header_lines: 70 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO CCGG (Individual Flasks) # contact_name: Gabrielle Petron # contact_telephone: (303) 497-4890 # contact_email: Gabrielle.Petron@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Bureau of Meteorology and Geophysics [BMG] # collaborator_comment: DHL account#: 540377880 # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: bkt # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2020-12-31 # description_creation-time: 2021-07-29 08:17:30 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number BKT 2004 01 08 08 13 00 6111-66 G co CCGG 175.030 -999.990 P.. R5 2004 02 13 17 48 00 -0.2000 100.3200 875.00 845.00 30.00 167568 BKT 2004 01 08 08 13 00 6112-66 G co CCGG 171.210 -999.990 P.. R5 2004 02 13 18 01 00 -0.2000 100.3200 875.00 845.00 30.00 167569 BKT 2004 01 14 07 36 00 2415-99 G co CCGG 182.750 -999.990 ... R5 2004 02 13 16 30 00 -0.2000 100.3200 875.00 845.00 30.00 167570 BKT 2004 01 14 07 36 00 2416-99 G co CCGG 183.400 -999.990 ... R5 2004 02 13 16 43 00 -0.2000 100.3200 875.00 845.00 30.00 167571 BKT 2004 01 21 06 40 00 2403-99 G co CCGG 194.710 -999.990 ... R5 2004 02 13 17 22 00 -0.2000 100.3200 875.00 845.00 30.00 167572 BKT 2004 01 21 06 40 00 2406-99 G co CCGG 195.270 -999.990 ... R5 2004 02 13 17 35 00 -0.2000 100.3200 875.00 845.00 30.00 167573 BKT 2004 01 29 07 28 00 2404-99 G co CCGG 208.760 -999.990 ... R5 2004 02 13 17 09 00 -0.2000 100.3200 875.00 845.00 30.00 167574 BKT 2004 01 29 07 28 00 2405-99 G co CCGG 208.500 -999.990 ... R5 2004 02 13 16 56 00 -0.2000 100.3200 875.00 845.00 30.00 167575 BKT 2004 02 04 06 05 00 2411-99 G co CCGG 120.060 -999.990 ... R5 2004 04 06 16 13 00 -0.2000 100.3200 875.00 845.00 30.00 167576 BKT 2004 02 04 06 05 00 2412-99 G co CCGG 119.910 -999.990 ... R5 2004 04 06 16 26 00 -0.2000 100.3200 875.00 845.00 30.00 167577 BKT 2004 02 11 08 05 00 2413-99 G co CCGG 221.550 -999.990 ... R5 2004 04 06 16 39 00 -0.2000 100.3200 875.00 845.00 30.00 167578 BKT 2004 02 11 08 05 00 2414-99 G co CCGG 222.330 -999.990 ... R5 2004 04 06 16 52 00 -0.2000 100.3200 875.00 845.00 30.00 167579 BKT 2004 02 18 06 00 00 2395-99 G co CCGG 126.500 -999.990 ... R5 2004 03 18 09 33 00 -0.2000 100.3200 875.00 845.00 30.00 167580 BKT 2004 02 18 06 00 00 2398-99 G co CCGG 125.370 -999.990 ... R5 2004 03 18 09 46 00 -0.2000 100.3200 875.00 845.00 30.00 167581 BKT 2004 02 24 07 17 00 2396-99 G co CCGG 318.480 -999.990 .XC R5 2004 03 18 10 12 00 -0.2000 100.3200 875.00 845.00 30.00 167582 BKT 2004 02 24 07 17 00 2397-99 G co CCGG 318.460 -999.990 .XC R5 2004 03 18 09 59 00 -0.2000 100.3200 875.00 845.00 30.00 167583 BKT 2004 03 03 08 56 00 2983-99 G co CCGG 118.510 -999.990 ... R5 2004 04 05 12 53 00 -0.2000 100.3200 875.00 845.00 30.00 167584 BKT 2004 03 03 08 56 00 2984-99 G co CCGG 117.970 -999.990 ... R5 2004 04 05 13 06 00 -0.2000 100.3200 875.00 845.00 30.00 167585 BKT 2004 03 09 07 05 00 1977-99 G co CCGG 164.720 -999.990 ... R5 2004 04 05 12 27 00 -0.2000 100.3200 875.00 845.00 30.00 167586 BKT 2004 03 09 07 05 00 1978-99 G co CCGG 164.200 -999.990 ... R5 2004 04 05 12 40 00 -0.2000 100.3200 875.00 845.00 30.00 167587 BKT 2004 03 17 07 17 00 2971-99 G co CCGG 142.850 -999.990 ... R5 2004 04 05 13 19 00 -0.2000 100.3200 875.00 845.00 30.00 167588 BKT 2004 03 17 07 17 00 2972-99 G co CCGG 144.510 -999.990 ... R5 2004 04 05 13 33 00 -0.2000 100.3200 875.00 845.00 30.00 167589 BKT 2004 03 25 05 19 00 2969-99 G co CCGG 134.890 -999.990 ... R5 2004 04 05 13 46 00 -0.2000 100.3200 875.00 845.00 30.00 167590 BKT 2004 03 25 05 19 00 2970-99 G co CCGG 133.690 -999.990 ... R5 2004 04 05 13 59 00 -0.2000 100.3200 875.00 845.00 30.00 167591 BKT 2004 03 31 06 52 00 1060-99 G co CCGG 214.840 -999.990 ... R5 2004 04 21 13 38 00 -0.2000 100.3200 875.00 845.00 30.00 167593 BKT 2004 03 31 06 52 00 803-99 G co CCGG 213.520 -999.990 ... R5 2004 04 21 13 25 00 -0.2000 100.3200 875.00 845.00 30.00 167592 BKT 2004 04 08 07 14 00 1059-99 G co CCGG 106.680 -999.990 ... R5 2004 04 21 12 59 00 -0.2000 100.3200 875.00 845.00 30.00 167595 BKT 2004 04 08 07 14 00 766-99 G co CCGG 106.890 -999.990 ... R5 2004 04 21 13 12 00 -0.2000 100.3200 875.00 845.00 30.00 167594 BKT 2004 04 14 04 53 00 1535-99 G co CCGG 141.720 -999.990 ... R5 2004 04 21 13 51 00 -0.2000 100.3200 875.00 845.00 30.00 167596 BKT 2004 04 14 04 53 00 1536-99 G co CCGG 142.420 -999.990 ... R5 2004 04 21 14 05 00 -0.2000 100.3200 875.00 845.00 30.00 167597 BKT 2004 04 21 05 55 00 1659-99 G co CCGG 145.890 -999.990 ... R5 2004 05 25 10 32 00 -0.2000 100.3200 875.00 845.00 30.00 167598 BKT 2004 04 21 05 55 00 1660-99 G co CCGG 145.870 -999.990 ... R5 2004 05 25 10 45 00 -0.2000 100.3200 875.00 845.00 30.00 167599 BKT 2004 04 28 05 02 00 3347-99 G co CCGG 146.480 -999.990 ... R5 2004 05 25 10 58 00 -0.2000 100.3200 875.00 845.00 30.00 167600 BKT 2004 04 28 05 02 00 3348-99 G co CCGG 146.550 -999.990 ... R5 2004 05 25 11 11 00 -0.2000 100.3200 875.00 845.00 30.00 167601 BKT 2004 05 05 05 09 00 2157-99 G co CCGG 80.470 -999.990 ... R5 2004 05 19 15 34 00 -0.2000 100.3200 875.00 845.00 30.00 167602 BKT 2004 05 12 05 10 00 877-99 G co CCGG 78.620 -999.990 ... R5 2004 05 19 14 02 00 -0.2000 100.3200 875.00 845.00 30.00 167603 BKT 2004 05 12 05 10 00 878-99 G co CCGG 77.990 -999.990 ... R5 2004 05 19 14 16 00 -0.2000 100.3200 875.00 845.00 30.00 167604 BKT 2004 05 19 05 05 00 2499-99 G co CCGG 146.970 -999.990 ... R5 2004 07 08 14 19 00 -0.2000 100.3200 875.00 845.00 30.00 167605 BKT 2004 05 19 05 05 00 2500-99 G co CCGG 147.660 -999.990 ... R5 2004 07 08 14 32 00 -0.2000 100.3200 875.00 845.00 30.00 167606 BKT 2004 05 26 05 05 00 2251-99 G co CCGG 92.850 -999.990 ... R5 2004 07 08 13 53 00 -0.2000 100.3200 875.00 845.00 30.00 167607 BKT 2004 05 26 05 05 00 2252-99 G co CCGG 93.260 -999.990 ... R5 2004 07 08 14 06 00 -0.2000 100.3200 875.00 845.00 30.00 167608 BKT 2004 06 02 03 49 00 3043-99 G co CCGG 79.290 -999.990 ... R5 2004 07 12 10 11 00 -0.2000 100.3200 875.00 845.00 30.00 167609 BKT 2004 06 02 03 49 00 3044-99 G co CCGG 79.580 -999.990 ... R5 2004 07 12 10 24 00 -0.2000 100.3200 875.00 845.00 30.00 167610 BKT 2004 06 09 05 00 00 6229-66 G co CCGG 72.340 -999.990 ... R5 2004 07 12 10 37 00 -0.2000 100.3200 875.00 845.00 30.00 167611 BKT 2004 06 09 05 00 00 6230-66 G co CCGG 71.090 -999.990 ... R5 2004 07 12 10 50 00 -0.2000 100.3200 875.00 845.00 30.00 167612 BKT 2004 06 24 05 32 00 3093-99 G co CCGG 167.360 -999.990 P.. R5 2004 08 10 15 48 00 -0.2000 100.3200 875.00 845.00 30.00 167613 BKT 2004 06 24 05 32 00 3094-99 G co CCGG 170.490 -999.990 P.. R5 2004 08 10 16 01 00 -0.2000 100.3200 875.00 845.00 30.00 167614 BKT 2004 06 30 05 05 00 2337-99 G co CCGG 68.870 -999.990 ... R5 2004 08 10 14 20 00 -0.2000 100.3200 875.00 845.00 30.00 167615 BKT 2004 06 30 05 05 00 2338-99 G co CCGG 68.260 -999.990 ... R5 2004 08 10 14 33 00 -0.2000 100.3200 875.00 845.00 30.00 167616 BKT 2004 07 08 07 56 00 1607-99 G co CCGG 72.900 -999.990 ... R5 2004 08 10 13 02 00 -0.2000 100.3200 875.00 845.00 30.00 167617 BKT 2004 07 08 07 56 00 1608-99 G co CCGG 72.600 -999.990 ... R5 2004 08 10 13 15 00 -0.2000 100.3200 875.00 845.00 30.00 167618 BKT 2004 07 15 06 50 00 55-99 G co CCGG 142.940 -999.990 ... R5 2004 08 10 13 28 00 -0.2000 100.3200 875.00 845.00 30.00 167619 BKT 2004 07 15 06 50 00 56-99 G co CCGG 143.460 -999.990 ... R5 2004 08 10 13 41 00 -0.2000 100.3200 875.00 845.00 30.00 167620 BKT 2004 07 20 07 06 00 2293-99 G co CCGG 126.030 -999.990 ... R5 2004 08 05 14 58 00 -0.2000 100.3200 875.00 845.00 30.00 167621 BKT 2004 07 20 07 06 00 2294-99 G co CCGG 122.830 -999.990 ... R5 2004 08 05 15 11 00 -0.2000 100.3200 875.00 845.00 30.00 167622 BKT 2004 07 27 05 50 00 3145-99 G co CCGG 79.500 -999.990 ... R5 2004 08 05 14 32 00 -0.2000 100.3200 875.00 845.00 30.00 167623 BKT 2004 07 27 05 50 00 3146-99 G co CCGG 79.350 -999.990 ... R5 2004 08 05 14 45 00 -0.2000 100.3200 875.00 845.00 30.00 167624 BKT 2004 08 04 07 13 00 2391-99 G co CCGG 112.640 -999.990 ... R5 2004 09 20 17 29 00 -0.2000 100.3100 875.00 845.00 30.00 188676 BKT 2004 08 11 07 45 00 3312-99 G co CCGG 142.240 -999.990 ... R5 2004 09 20 18 13 00 -0.2000 100.3100 875.00 845.00 30.00 188675 BKT 2004 08 11 07 45 00 843-99 G co CCGG 141.860 -999.990 ... R5 2004 09 20 17 59 00 -0.2000 100.3100 875.00 845.00 30.00 188674 BKT 2004 08 19 07 01 00 2229-99 G co CCGG 75.640 -999.990 ... R5 2004 09 28 19 48 00 -0.2000 100.3100 875.00 845.00 30.00 188638 BKT 2004 08 19 07 01 00 2230-99 G co CCGG 74.830 -999.990 ... R5 2004 09 28 20 02 00 -0.2000 100.3100 875.00 845.00 30.00 188639 BKT 2004 08 25 07 08 00 2657-99 G co CCGG 67.500 -999.990 ... R5 2004 09 28 18 51 00 -0.2000 100.3100 875.00 845.00 30.00 188640 BKT 2004 08 25 07 08 00 2658-99 G co CCGG 67.370 -999.990 ... R5 2004 09 28 19 06 00 -0.2000 100.3100 875.00 845.00 30.00 188641 BKT 2004 08 31 06 53 00 2767-99 G co CCGG 110.440 -999.990 ... R5 2004 11 10 10 35 00 -0.2000 100.3100 875.00 845.00 30.00 191493 BKT 2004 08 31 06 53 00 2768-99 G co CCGG 110.520 -999.990 ... R5 2004 11 10 10 49 00 -0.2000 100.3100 875.00 845.00 30.00 191494 BKT 2004 09 07 06 50 00 1295-99 G co CCGG 314.400 -999.990 P.C R5 2004 11 10 11 03 00 -0.2000 100.3100 875.00 845.00 30.00 191495 BKT 2004 09 07 06 50 00 1296-99 G co CCGG 323.240 -999.990 P.C R5 2004 11 10 11 17 00 -0.2000 100.3100 875.00 845.00 30.00 191496 BKT 2004 09 16 07 15 00 2467-99 G co CCGG 262.880 -999.990 .XC R5 2004 11 09 11 12 00 -0.2000 100.3100 875.00 845.00 30.00 191297 BKT 2004 09 16 07 15 00 2468-99 G co CCGG 263.100 -999.990 .XC R5 2004 11 09 11 26 00 -0.2000 100.3100 875.00 845.00 30.00 191298 BKT 2004 09 22 07 01 00 4049-99 G co CCGG 138.660 -999.990 ... R5 2004 11 04 15 27 00 -0.2000 100.3100 875.00 845.00 30.00 191382 BKT 2004 09 22 07 01 00 4050-99 G co CCGG 138.450 -999.990 ... R5 2004 11 04 15 41 00 -0.2000 100.3100 875.00 845.00 30.00 191383 BKT 2004 09 29 07 25 00 4051-99 G co CCGG 88.980 -999.990 ... R5 2004 11 04 14 58 00 -0.2000 100.3100 875.00 845.00 30.00 191384 BKT 2004 09 29 07 25 00 4052-99 G co CCGG 89.390 -999.990 ... R5 2004 11 04 15 12 00 -0.2000 100.3100 875.00 845.00 30.00 191385 BKT 2004 10 06 07 00 00 1827-99 G co CCGG 118.490 -999.990 ... R5 2004 11 09 11 40 00 -0.2000 100.3100 875.00 845.00 30.00 191299 BKT 2004 10 06 07 00 00 1828-99 G co CCGG 119.870 -999.990 ... R5 2004 11 09 11 54 00 -0.2000 100.3100 875.00 845.00 30.00 191300 BKT 2004 10 13 07 10 00 1497-99 G co CCGG 326.940 -999.990 P.C R5 2004 11 09 12 08 00 -0.2000 100.3100 875.00 845.00 30.00 191301 BKT 2004 10 13 07 10 00 844-99 G co CCGG 339.440 -999.990 P.C R5 2004 11 09 12 22 00 -0.2000 100.3100 875.00 845.00 30.00 191302 BKT 2004 10 21 07 03 00 897-99 G co CCGG 322.250 -999.990 .XC R5 2004 11 09 12 36 00 -0.2000 100.3100 875.00 845.00 30.00 191303 BKT 2004 10 21 07 03 00 898-99 G co CCGG 322.340 -999.990 .XC R5 2004 11 09 12 51 00 -0.2000 100.3100 875.00 845.00 30.00 191304 BKT 2004 10 26 07 15 00 4047-99 G co CCGG 222.570 -999.990 .X. R5 2004 11 24 13 40 00 -0.2000 100.3100 875.00 845.00 30.00 192200 BKT 2004 10 26 07 15 00 4048-99 G co CCGG 224.820 -999.990 .X. R5 2004 11 24 13 54 00 -0.2000 100.3100 875.00 845.00 30.00 192201 BKT 2004 11 02 07 10 00 2547-99 G co CCGG 175.720 -999.990 ... R5 2004 11 24 13 12 00 -0.2000 100.3100 875.00 845.00 30.00 192202 BKT 2004 11 09 07 00 00 3865-99 G co CCGG 136.550 -999.990 ... R5 2004 11 29 09 52 00 -0.2000 100.3100 875.00 845.00 30.00 192218 BKT 2004 11 09 07 00 00 3866-99 G co CCGG 137.140 -999.990 ... R5 2004 11 29 10 06 00 -0.2000 100.3100 875.00 845.00 30.00 192219 BKT 2004 11 18 07 00 00 6665-66 G co CCGG 112.870 -999.990 ... R5 2004 11 29 11 44 00 -0.2000 100.3100 875.00 845.00 30.00 192220 BKT 2004 11 18 07 00 00 6666-66 G co CCGG 112.460 -999.990 ... R5 2004 11 29 11 59 00 -0.2000 100.3100 875.00 845.00 30.00 192221 BKT 2004 11 23 09 08 00 3143-99 G co CCGG 132.820 -999.990 ... R5 2005 01 10 11 31 00 -0.2000 100.3100 875.00 845.00 30.00 193647 BKT 2004 11 23 09 08 00 3144-99 G co CCGG 131.170 -999.990 ... R5 2005 01 10 11 45 00 -0.2000 100.3100 875.00 845.00 30.00 193648 BKT 2004 11 30 07 16 00 53-99 G co CCGG 122.860 -999.990 ... R5 2005 01 10 11 59 00 -0.2000 100.3100 875.00 845.00 30.00 193649 BKT 2004 11 30 07 16 00 54-99 G co CCGG 122.730 -999.990 ... R5 2005 01 10 12 13 00 -0.2000 100.3100 875.00 845.00 30.00 193650 BKT 2004 12 07 07 12 00 1641-99 G co CCGG 148.810 -999.990 ... R5 2005 01 07 12 42 00 -0.2000 100.3100 875.00 845.00 30.00 193641 BKT 2004 12 07 07 12 00 1642-99 G co CCGG 149.880 -999.990 ... R5 2005 01 07 12 56 00 -0.2000 100.3100 875.00 845.00 30.00 193642 BKT 2004 12 14 07 02 00 2929-99 G co CCGG 135.590 -999.990 ... R5 2005 01 07 13 10 00 -0.2000 100.3100 875.00 845.00 30.00 193639 BKT 2004 12 14 07 02 00 2930-99 G co CCGG 135.620 -999.990 ... R5 2005 01 07 13 24 00 -0.2000 100.3100 875.00 845.00 30.00 193640 BKT 2004 12 21 07 00 00 2615-99 G co CCGG 154.590 -999.990 ... R5 2005 01 10 10 35 00 -0.2000 100.3100 875.00 845.00 30.00 193643 BKT 2004 12 21 07 00 00 2616-99 G co CCGG 154.780 -999.990 ... R5 2005 01 10 10 49 00 -0.2000 100.3100 875.00 845.00 30.00 193644 BKT 2004 12 28 07 03 00 1517-99 G co CCGG 139.030 -999.990 ... R5 2005 01 10 11 03 00 -0.2000 100.3100 875.00 845.00 30.00 193645 BKT 2004 12 28 07 03 00 1518-99 G co CCGG 138.970 -999.990 ... R5 2005 01 10 11 17 00 -0.2000 100.3100 875.00 845.00 30.00 193646 BKT 2005 01 04 07 06 00 1585-99 G co CCGG 254.750 -999.990 .XC R5 2005 02 18 12 02 00 -0.2000 100.3100 875.00 845.00 30.00 195224 BKT 2005 01 04 07 06 00 1586-99 G co CCGG 255.700 -999.990 .XC R5 2005 02 18 12 16 00 -0.2000 100.3100 875.00 845.00 30.00 195225 BKT 2005 01 18 07 03 00 1275-99 G co CCGG 345.650 -999.990 .XC R5 2005 02 18 11 34 00 -0.2000 100.3100 875.00 845.00 30.00 195226 BKT 2005 01 18 07 03 00 1276-99 G co CCGG 345.540 -999.990 .XC R5 2005 02 18 11 48 00 -0.2000 100.3100 875.00 845.00 30.00 195227 BKT 2005 01 25 07 13 00 2555-99 G co CCGG 685.340 -999.990 .NC R5 2005 02 18 12 30 00 -0.2000 100.3100 875.00 845.00 30.00 195228 BKT 2005 01 25 07 13 00 2556-99 G co CCGG 686.570 -999.990 .NC R5 2005 02 18 12 44 00 -0.2000 100.3100 875.00 845.00 30.00 195229 BKT 2005 02 02 07 02 00 3937-99 G co CCGG 199.510 -999.990 A.> R5 2005 02 25 09 31 00 -0.2000 100.3100 875.00 845.00 30.00 195230 BKT 2005 02 08 07 02 00 1739-99 G co CCGG 592.700 -999.990 .NC R5 2005 03 23 09 46 00 -0.2000 100.3100 875.00 845.00 30.00 196849 BKT 2005 02 08 07 02 00 1740-99 G co CCGG 591.290 -999.990 .NC R5 2005 03 23 10 00 00 -0.2000 100.3100 875.00 845.00 30.00 196850 BKT 2005 02 15 07 12 00 171-99 G co CCGG 750.220 -999.990 .NC R5 2005 03 22 16 08 00 -0.2000 100.3100 875.00 845.00 30.00 196845 BKT 2005 02 15 07 12 00 172-99 G co CCGG 749.460 -999.990 .NC R5 2005 03 22 16 22 00 -0.2000 100.3100 875.00 845.00 30.00 196846 BKT 2005 02 22 07 02 00 3851-99 G co CCGG 717.440 -999.990 P.C R5 2005 03 23 10 14 00 -0.2000 100.3100 875.00 845.00 30.00 196847 BKT 2005 02 22 07 02 00 3852-99 G co CCGG 729.850 -999.990 P.C R5 2005 03 23 10 28 00 -0.2000 100.3100 875.00 845.00 30.00 196848 BKT 2005 03 02 07 04 00 765-99 G co CCGG 294.420 -999.990 .XC R5 2005 03 23 09 18 00 -0.2000 100.3100 875.00 845.00 30.00 196851 BKT 2005 03 02 07 04 00 766-99 G co CCGG 291.900 -999.990 .XC R5 2005 03 23 09 32 00 -0.2000 100.3100 875.00 845.00 30.00 196852 BKT 2005 03 09 07 02 00 3361-99 G co CCGG 443.090 -999.990 .NC R5 2005 06 01 13 18 00 -0.2000 100.3100 875.00 845.00 30.00 199341 BKT 2005 03 09 07 02 00 3362-99 G co CCGG 443.170 -999.990 .NC R5 2005 06 01 13 33 00 -0.2000 100.3100 875.00 845.00 30.00 199342 BKT 2005 03 16 07 00 00 2479-99 G co CCGG 476.120 -999.990 P.C R5 2005 06 01 14 05 00 -0.2000 100.3100 875.00 845.00 30.00 199347 BKT 2005 03 16 07 00 00 2480-99 G co CCGG 480.300 -999.990 P.C R5 2005 06 01 14 19 00 -0.2000 100.3100 875.00 845.00 30.00 199348 BKT 2005 03 23 07 05 00 2573-99 G co CCGG 290.710 -999.990 .XC R5 2005 06 01 14 33 00 -0.2000 100.3100 875.00 845.00 30.00 199345 BKT 2005 03 23 07 05 00 2574-99 G co CCGG 288.650 -999.990 .XC R5 2005 06 01 14 47 00 -0.2000 100.3100 875.00 845.00 30.00 199346 BKT 2005 03 30 07 20 00 3369-99 G co CCGG 103.930 -999.990 ... R5 2005 06 01 12 50 00 -0.2000 100.3100 875.00 845.00 30.00 199343 BKT 2005 03 30 07 20 00 3370-99 G co CCGG 104.400 -999.990 ... R5 2005 06 01 13 04 00 -0.2000 100.3100 875.00 845.00 30.00 199344 BKT 2005 04 06 07 00 00 4097-99 G co CCGG 176.270 -999.990 P.. R5 2005 06 20 13 53 00 -0.2000 100.3100 875.00 845.00 30.00 200277 BKT 2005 04 06 07 00 00 4098-99 G co CCGG 173.010 -999.990 P.. R5 2005 06 20 14 08 00 -0.2000 100.3100 875.00 845.00 30.00 200278 BKT 2005 04 18 07 10 00 3187-99 G co CCGG 14.760 -999.990 Z.C R5 2005 06 02 10 07 00 -0.2000 100.3100 875.00 845.00 30.00 199337 BKT 2005 04 18 07 10 00 3187-99 G co CCGG 122.530 -999.990 ... R5 2005 06 02 14 01 00 -0.2000 100.3100 875.00 845.00 30.00 199337 BKT 2005 04 18 07 10 00 3188-99 G co CCGG 14.040 -999.990 Z.C R5 2005 06 02 10 21 00 -0.2000 100.3100 875.00 845.00 30.00 199338 BKT 2005 04 18 07 10 00 3188-99 G co CCGG 122.040 -999.990 ... R5 2005 06 02 14 15 00 -0.2000 100.3100 875.00 845.00 30.00 199338 BKT 2005 04 25 07 00 00 3571-99 G co CCGG 117.170 -999.990 ... R5 2005 06 02 10 41 00 -0.2000 100.3100 875.00 845.00 30.00 199339 BKT 2005 04 25 07 00 00 3572-99 G co CCGG 117.120 -999.990 ... R5 2005 06 02 10 55 00 -0.2000 100.3100 875.00 845.00 30.00 199340 BKT 2005 05 01 07 02 00 2981-99 G co CCGG 15.310 -999.990 Z.C R5 2005 06 02 09 39 00 -0.2000 100.3100 875.00 845.00 30.00 199333 BKT 2005 05 01 07 02 00 2981-99 G co CCGG 138.390 -999.990 ... R5 2005 06 02 13 32 00 -0.2000 100.3100 875.00 845.00 30.00 199333 BKT 2005 05 01 07 02 00 2982-99 G co CCGG 14.760 -999.990 Z.C R5 2005 06 02 09 53 00 -0.2000 100.3100 875.00 845.00 30.00 199334 BKT 2005 05 01 07 02 00 2982-99 G co CCGG 139.620 -999.990 ... R5 2005 06 02 13 46 00 -0.2000 100.3100 875.00 845.00 30.00 199334 BKT 2005 05 08 07 00 00 6083-66 G co CCGG 74.280 -999.990 ... R5 2005 06 01 15 02 00 -0.2000 100.3100 875.00 845.00 30.00 199335 BKT 2005 05 08 07 00 00 6084-66 G co CCGG 73.100 -999.990 ... R5 2005 06 01 15 16 00 -0.2000 100.3100 875.00 845.00 30.00 199336 BKT 2005 05 18 07 00 00 893-99 G co CCGG 121.850 -999.990 ... R5 2005 06 20 13 25 00 -0.2000 100.3100 875.00 845.00 30.00 200275 BKT 2005 05 18 07 00 00 894-99 G co CCGG 123.490 -999.990 ... R5 2005 06 20 13 39 00 -0.2000 100.3100 875.00 845.00 30.00 200276 BKT 2005 05 25 07 01 00 635-99 G co CCGG 93.780 -999.990 ... R5 2005 07 19 10 56 00 -0.2000 100.3100 875.00 845.00 30.00 201779 BKT 2005 05 25 07 01 00 636-99 G co CCGG 93.400 -999.990 ... R5 2005 07 19 11 11 00 -0.2000 100.3100 875.00 845.00 30.00 201780 BKT 2005 06 01 07 20 00 1461-99 G co CCGG 127.660 -999.990 ... R5 2005 07 19 10 28 00 -0.2000 100.3100 875.00 845.00 30.00 201777 BKT 2005 06 01 07 20 00 1462-99 G co CCGG 124.900 -999.990 ... R5 2005 07 19 10 42 00 -0.2000 100.3100 875.00 845.00 30.00 201778 BKT 2005 06 08 07 00 00 3019-99 G co CCGG 94.940 -999.990 ... R5 2005 07 19 09 31 00 -0.2000 100.3100 875.00 845.00 30.00 201773 BKT 2005 06 08 07 00 00 3020-99 G co CCGG 96.290 -999.990 ... R5 2005 07 19 09 45 00 -0.2000 100.3100 875.00 845.00 30.00 201774 BKT 2005 06 12 08 00 00 2033-99 G co CCGG 105.560 -999.990 ... R5 2005 07 19 09 59 00 -0.2000 100.3100 875.00 845.00 30.00 201776 BKT 2005 06 12 08 00 00 2034-99 G co CCGG 105.240 -999.990 ... R5 2005 07 19 10 14 00 -0.2000 100.3100 875.00 845.00 30.00 201775 BKT 2005 06 16 07 00 00 1991-99 G co CCGG 81.000 -999.990 ... R5 2005 08 15 11 42 00 -0.2000 100.3100 875.00 845.00 30.00 203265 BKT 2005 06 16 07 00 00 1992-99 G co CCGG 81.060 -999.990 ... R5 2005 08 15 11 56 00 -0.2000 100.3100 875.00 845.00 30.00 203266 BKT 2005 06 24 07 06 00 2961-99 G co CCGG 92.100 -999.990 ... R5 2005 08 15 12 10 00 -0.2000 100.3100 875.00 845.00 30.00 203267 BKT 2005 06 24 07 06 00 2962-99 G co CCGG 92.290 -999.990 ... R5 2005 08 15 12 24 00 -0.2000 100.3100 875.00 845.00 30.00 203268 BKT 2005 06 29 07 07 00 2931-99 G co CCGG 90.980 -999.990 ... R5 2005 08 12 13 05 00 -0.2000 100.3100 875.00 845.00 30.00 203093 BKT 2005 06 29 07 07 00 2932-99 G co CCGG 91.260 -999.990 ... R5 2005 08 12 13 20 00 -0.2000 100.3100 875.00 845.00 30.00 203094 BKT 2005 07 06 07 07 00 2125-99 G co CCGG 87.430 -999.990 ... R5 2005 08 12 13 34 00 -0.2000 100.3100 875.00 845.00 30.00 203092 BKT 2005 07 13 07 35 00 3507-99 G co CCGG 89.560 -999.990 ... R5 2005 08 15 12 39 00 -0.2000 100.3100 875.00 845.00 30.00 203269 BKT 2005 07 13 07 35 00 3508-99 G co CCGG 88.730 -999.990 ... R5 2005 08 15 12 53 00 -0.2000 100.3100 875.00 845.00 30.00 203270 BKT 2005 07 20 07 05 00 2313-99 G co CCGG 101.240 -999.990 ... R5 2005 08 15 13 07 00 -0.2000 100.3100 875.00 845.00 30.00 203271 BKT 2005 07 20 07 05 00 2314-99 G co CCGG 102.190 -999.990 ... R5 2005 08 15 13 21 00 -0.2000 100.3100 875.00 845.00 30.00 203272 BKT 2005 07 27 07 00 00 3861-99 G co CCGG 89.130 -999.990 ... R5 2005 10 03 13 09 00 -0.2000 100.3100 875.00 845.00 30.00 205902 BKT 2005 07 27 07 00 00 3862-99 G co CCGG 88.970 -999.990 ... R5 2005 10 03 13 24 00 -0.2000 100.3100 875.00 845.00 30.00 205903 BKT 2005 08 03 07 10 00 103-99 G co CCGG 93.840 -999.990 ... R5 2005 10 03 13 38 00 -0.2000 100.3100 875.00 845.00 30.00 205904 BKT 2005 08 03 07 10 00 104-99 G co CCGG 94.650 -999.990 ... R5 2005 10 03 13 52 00 -0.2000 100.3100 875.00 845.00 30.00 205905 BKT 2005 08 09 07 05 00 2005-99 G co CCGG 73.030 -999.990 ... R5 2005 10 03 14 35 00 -0.2000 100.3100 875.00 845.00 30.00 205908 BKT 2005 08 09 07 05 00 2006-99 G co CCGG 73.230 -999.990 ... R5 2005 10 03 14 49 00 -0.2000 100.3100 875.00 845.00 30.00 205909 BKT 2005 08 16 07 15 00 1281-99 G co CCGG 241.470 -999.990 .XC R5 2005 10 03 14 06 00 -0.2000 100.3100 875.00 845.00 30.00 205906 BKT 2005 08 16 07 15 00 1282-99 G co CCGG 243.090 -999.990 .XC R5 2005 10 03 14 20 00 -0.2000 100.3100 875.00 845.00 30.00 205907 BKT 2005 08 23 07 05 00 3205-99 G co CCGG 110.090 -999.990 ... R5 2005 10 18 10 48 00 -0.2000 100.3100 875.00 845.00 30.00 207011 BKT 2005 08 23 07 05 00 3206-99 G co CCGG 107.740 -999.990 ... R5 2005 10 18 11 03 00 -0.2000 100.3100 875.00 845.00 30.00 207012 BKT 2005 08 31 07 30 00 3465-99 G co CCGG 174.060 -999.990 ... R5 2005 10 18 09 23 00 -0.2000 100.3100 875.00 845.00 30.00 207009 BKT 2005 08 31 07 30 00 3466-99 G co CCGG 174.200 -999.990 ... R5 2005 10 18 09 37 00 -0.2000 100.3100 875.00 845.00 30.00 207010 BKT 2005 09 07 07 10 00 2607-99 G co CCGG 86.800 -999.990 ... R5 2005 10 25 11 12 00 -0.2000 100.3100 875.00 845.00 30.00 207069 BKT 2005 09 13 00 00 00 2745-99 G co CCGG 108.050 -999.990 P.. R5 2005 10 24 10 07 00 -0.2000 100.3100 875.00 845.00 30.00 207067 BKT 2005 09 13 00 00 00 2746-99 G co CCGG 115.020 -999.990 P.. R5 2005 10 24 10 21 00 -0.2000 100.3100 875.00 845.00 30.00 207068 BKT 2005 09 20 07 07 00 3029-99 G co CCGG 128.070 -999.990 ... R5 2005 10 24 11 32 00 -0.2000 100.3100 875.00 845.00 30.00 207072 BKT 2005 09 20 07 07 00 3030-99 G co CCGG 127.260 -999.990 ... R5 2005 10 24 11 46 00 -0.2000 100.3100 875.00 845.00 30.00 207073 BKT 2005 09 28 07 05 00 2873-99 G co CCGG 224.110 -999.990 .X. R5 2005 10 24 11 04 00 -0.2000 100.3100 875.00 845.00 30.00 207070 BKT 2005 09 28 07 05 00 2874-99 G co CCGG 224.860 -999.990 .X. R5 2005 10 24 11 18 00 -0.2000 100.3100 875.00 845.00 30.00 207071 BKT 2005 10 05 07 30 00 3473-99 G co CCGG 97.880 -999.990 ... R5 2005 12 01 16 15 00 -0.2000 100.3100 875.00 845.00 30.00 209341 BKT 2005 10 05 07 30 00 3474-99 G co CCGG 97.770 -999.990 ... R5 2005 12 01 16 30 00 -0.2000 100.3100 875.00 845.00 30.00 209342 BKT 2005 10 12 07 00 00 1163-99 G co CCGG 84.080 -999.990 ... R5 2005 12 01 15 47 00 -0.2000 100.3100 875.00 845.00 30.00 209343 BKT 2005 10 12 07 00 00 1164-99 G co CCGG 83.840 -999.990 ... R5 2005 12 01 16 01 00 -0.2000 100.3100 875.00 845.00 30.00 209344 BKT 2005 10 19 07 10 00 571-99 G co CCGG 96.660 -999.990 ... R5 2005 12 02 15 04 00 -0.2000 100.3100 875.00 845.00 30.00 209361 BKT 2005 10 19 07 10 00 572-99 G co CCGG 95.960 -999.990 ... R5 2005 12 02 15 19 00 -0.2000 100.3100 875.00 845.00 30.00 209362 BKT 2005 10 26 07 00 00 573-99 G co CCGG 85.730 -999.990 ... R5 2005 12 02 15 33 00 -0.2000 100.3100 875.00 845.00 30.00 209359 BKT 2005 10 26 07 00 00 574-99 G co CCGG 85.750 -999.990 ... R5 2005 12 02 15 47 00 -0.2000 100.3100 875.00 845.00 30.00 209360 BKT 2005 11 02 07 00 00 511-99 G co CCGG 87.280 -999.990 ... R5 2005 12 02 14 07 00 -0.2000 100.3100 875.00 845.00 30.00 209357 BKT 2005 11 02 07 00 00 512-99 G co CCGG 87.000 -999.990 ... R5 2005 12 02 14 22 00 -0.2000 100.3100 875.00 845.00 30.00 209358 BKT 2005 11 09 07 00 00 1993-99 G co CCGG 129.720 -999.990 ... R5 2005 12 02 14 36 00 -0.2000 100.3100 875.00 845.00 30.00 209355 BKT 2005 11 09 07 00 00 1994-99 G co CCGG 129.750 -999.990 ... R5 2005 12 02 14 50 00 -0.2000 100.3100 875.00 845.00 30.00 209356 BKT 2005 11 16 15 00 00 2323-99 G co CCGG 75.600 -999.990 ... R5 2006 01 09 12 41 00 -0.2000 100.3100 875.00 845.00 30.00 210984 BKT 2005 11 16 15 00 00 2324-99 G co CCGG 75.860 -999.990 ... R5 2006 01 09 12 56 00 -0.2000 100.3100 875.00 845.00 30.00 210985 BKT 2005 11 22 15 30 00 4003-99 G co CCGG 160.040 -999.990 ... R5 2006 01 09 12 13 00 -0.2000 100.3100 875.00 845.00 30.00 210982 BKT 2005 11 22 15 30 00 4004-99 G co CCGG 160.210 -999.990 ... R5 2006 01 09 12 27 00 -0.2000 100.3100 875.00 845.00 30.00 210983 BKT 2005 11 28 07 05 00 2143-99 G co CCGG 86.280 -999.990 ... R5 2006 01 09 11 44 00 -0.2000 100.3100 875.00 845.00 30.00 210980 BKT 2005 11 28 07 05 00 2144-99 G co CCGG 85.030 -999.990 ... R5 2006 01 09 11 59 00 -0.2000 100.3100 875.00 845.00 30.00 210981 BKT 2005 12 06 07 00 00 3871-99 G co CCGG 95.800 -999.990 ... R5 2006 01 09 11 16 00 -0.2000 100.3100 875.00 845.00 30.00 210978 BKT 2005 12 06 07 00 00 3872-99 G co CCGG 96.580 -999.990 ... R5 2006 01 09 11 30 00 -0.2000 100.3100 875.00 845.00 30.00 210979 BKT 2005 12 14 07 00 00 577-99 G co CCGG 104.510 -999.990 ... R5 2006 01 25 09 49 00 -0.2000 100.3100 875.00 845.00 30.00 211594 BKT 2005 12 14 07 00 00 578-99 G co CCGG 103.810 -999.990 ... R5 2006 01 25 10 03 00 -0.2000 100.3100 875.00 845.00 30.00 211595 BKT 2005 12 21 05 05 00 1829-99 G co CCGG 144.240 -999.990 ... R5 2006 01 24 17 53 00 -0.2000 100.3100 875.00 845.00 30.00 211596 BKT 2005 12 21 05 05 00 1830-99 G co CCGG 145.610 -999.990 ... R5 2006 01 24 18 07 00 -0.2000 100.3100 875.00 845.00 30.00 211597 BKT 2005 12 28 07 00 00 399-99 G co CCGG 127.350 -999.990 ... R5 2006 01 25 09 20 00 -0.2000 100.3100 875.00 845.00 30.00 211600 BKT 2005 12 28 07 00 00 400-99 G co CCGG 127.750 -999.990 ... R5 2006 01 25 09 34 00 -0.2000 100.3100 875.00 845.00 30.00 211601 BKT 2006 01 03 07 00 00 3877-99 G co CCGG 111.560 -999.990 ... R5 2006 01 25 10 17 00 -0.2000 100.3100 875.00 845.00 30.00 211598 BKT 2006 01 03 07 00 00 3878-99 G co CCGG 110.120 -999.990 ... R5 2006 01 25 10 31 00 -0.2000 100.3100 875.00 845.00 30.00 211599 BKT 2006 01 15 07 00 00 169-99 G co CCGG 141.070 -999.990 ... R5 2006 03 07 10 12 00 -0.2000 100.3100 875.00 845.00 30.00 213453 BKT 2006 01 15 07 00 00 170-99 G co CCGG 141.340 -999.990 ... R5 2006 03 07 10 26 00 -0.2000 100.3100 875.00 845.00 30.00 213454 BKT 2006 01 18 07 00 00 881-99 G co CCGG 97.450 -999.990 ... R5 2006 03 07 10 41 00 -0.2000 100.3100 875.00 845.00 30.00 213451 BKT 2006 01 18 07 00 00 882-99 G co CCGG 98.840 -999.990 ... R5 2006 03 07 10 55 00 -0.2000 100.3100 875.00 845.00 30.00 213452 BKT 2006 01 24 07 05 00 379-99 G co CCGG 124.300 -999.990 ... R5 2006 03 06 10 58 00 -0.2000 100.3100 875.00 845.00 30.00 213415 BKT 2006 01 24 07 05 00 380-99 G co CCGG 125.460 -999.990 ... R5 2006 03 06 11 12 00 -0.2000 100.3100 875.00 845.00 30.00 213416 BKT 2006 02 01 07 00 00 7-99 G co CCGG 362.260 -999.990 .XC R5 2006 03 06 10 01 00 -0.2000 100.3100 875.00 845.00 30.00 213417 BKT 2006 02 01 07 00 00 8-99 G co CCGG 362.730 -999.990 .XC R5 2006 03 06 10 15 00 -0.2000 100.3100 875.00 845.00 30.00 213418 BKT 2006 02 07 07 30 00 2307-99 G co CCGG 180.790 -999.990 ... R5 2006 03 06 16 11 00 -0.2000 100.3100 875.00 845.00 30.00 213447 BKT 2006 02 07 07 30 00 2308-99 G co CCGG 181.030 -999.990 ... R5 2006 03 06 16 25 00 -0.2000 100.3100 875.00 845.00 30.00 213448 BKT 2006 02 15 07 00 00 1873-99 G co CCGG 153.550 -999.990 ... R5 2006 03 06 16 39 00 -0.2000 100.3100 875.00 845.00 30.00 213449 BKT 2006 02 15 07 00 00 1874-99 G co CCGG 153.620 -999.990 ... R5 2006 03 06 16 54 00 -0.2000 100.3100 875.00 845.00 30.00 213450 BKT 2006 02 22 07 10 00 2973-99 G co CCGG 138.680 -999.990 ... R5 2006 05 09 11 17 00 -0.2000 100.3100 875.00 845.00 30.00 216222 BKT 2006 02 22 07 10 00 2974-99 G co CCGG 138.310 -999.990 ... R5 2006 05 09 11 31 00 -0.2000 100.3100 875.00 845.00 30.00 216223 BKT 2006 02 28 07 25 00 4031-99 G co CCGG 126.210 -999.990 ... R5 2006 05 09 11 45 00 -0.2000 100.3100 875.00 845.00 30.00 216224 BKT 2006 02 28 07 25 00 4032-99 G co CCGG 126.820 -999.990 ... R5 2006 05 09 11 59 00 -0.2000 100.3100 875.00 845.00 30.00 216225 BKT 2006 03 06 08 10 00 4497-99 G co CCGG 240.550 -999.990 ..C R5 2006 04 28 12 35 00 -0.2000 100.3100 875.00 845.00 30.00 216210 BKT 2006 03 06 08 10 00 4498-99 G co CCGG 238.510 -999.990 ..C R5 2006 04 28 12 49 00 -0.2000 100.3100 875.00 845.00 30.00 216211 BKT 2006 03 13 07 07 00 4495-99 G co CCGG 150.890 -999.990 ... R5 2006 04 28 13 03 00 -0.2000 100.3100 875.00 845.00 30.00 216212 BKT 2006 03 13 07 07 00 4496-99 G co CCGG 150.950 -999.990 ... R5 2006 04 28 13 17 00 -0.2000 100.3100 875.00 845.00 30.00 216213 BKT 2006 03 20 07 00 00 2353-99 G co CCGG 145.560 -999.990 ... R5 2006 05 09 10 20 00 -0.2000 100.3100 875.00 845.00 30.00 216218 BKT 2006 03 20 07 00 00 2354-99 G co CCGG 143.600 -999.990 ... R5 2006 05 09 10 34 00 -0.2000 100.3100 875.00 845.00 30.00 216219 BKT 2006 03 27 07 12 00 1765-99 G co CCGG 80.090 -999.990 ... R5 2006 05 09 09 23 00 -0.2000 100.3100 875.00 845.00 30.00 216220 BKT 2006 03 27 07 12 00 1766-99 G co CCGG 79.920 -999.990 ... R5 2006 05 09 09 37 00 -0.2000 100.3100 875.00 845.00 30.00 216221 BKT 2006 04 05 07 00 00 2045-99 G co CCGG 110.610 -999.990 ... R5 2006 05 01 09 16 00 -0.2000 100.3100 875.00 845.00 30.00 216206 BKT 2006 04 05 07 00 00 2046-99 G co CCGG 109.660 -999.990 ... R5 2006 05 01 09 30 00 -0.2000 100.3100 875.00 845.00 30.00 216207 BKT 2006 04 12 00 00 00 2533-99 G co CCGG 98.480 -999.990 P.. R5 2006 05 01 09 45 00 -0.2000 100.3100 875.00 845.00 30.00 216208 BKT 2006 04 12 00 00 00 2534-99 G co CCGG 101.530 -999.990 P.. R5 2006 05 01 09 59 00 -0.2000 100.3100 875.00 845.00 30.00 216209 BKT 2006 04 17 07 05 00 6113-66 G co CCGG 82.340 -999.990 ... R5 2006 05 30 15 16 00 -0.2000 100.3100 875.00 845.00 30.00 217160 BKT 2006 04 17 07 05 00 6114-66 G co CCGG 81.200 -999.990 ... R5 2006 05 30 15 31 00 -0.2000 100.3100 875.00 845.00 30.00 217161 BKT 2006 04 26 07 00 00 3649-99 G co CCGG 81.710 -999.990 ... R5 2006 05 31 08 53 00 -0.2000 100.3100 875.00 845.00 30.00 217162 BKT 2006 04 26 07 00 00 3650-99 G co CCGG 82.320 -999.990 ... R5 2006 05 31 09 07 00 -0.2000 100.3100 875.00 845.00 30.00 217163 BKT 2006 05 03 07 00 00 2427-99 G co CCGG 146.410 -999.990 ... R5 2006 06 06 09 22 00 -0.2000 100.3100 875.00 845.00 30.00 217331 BKT 2006 05 03 07 00 00 2428-99 G co CCGG 144.940 -999.990 ... R5 2006 06 06 09 36 00 -0.2000 100.3100 875.00 845.00 30.00 217332 BKT 2006 05 09 07 00 00 1589-99 G co CCGG 123.440 -999.990 ... R5 2006 06 06 09 07 00 -0.2000 100.3100 875.00 845.00 30.00 217330 BKT 2006 05 09 07 00 00 3767-99 G co CCGG 121.030 -999.990 ... R5 2006 06 06 08 53 00 -0.2000 100.3100 875.00 845.00 30.00 217329 BKT 2006 05 16 07 00 00 3069-99 G co CCGG 179.540 -999.990 P.. R5 2006 08 18 15 10 00 -0.2000 100.3100 875.00 845.00 30.00 220604 BKT 2006 05 16 07 00 00 3070-99 G co CCGG 172.910 -999.990 P.. R5 2006 08 18 15 25 00 -0.2000 100.3100 875.00 845.00 30.00 220605 BKT 2006 05 24 07 00 00 1873-99 G co CCGG 99.550 -999.990 ... R5 2006 08 18 14 42 00 -0.2000 100.3100 875.00 845.00 30.00 220606 BKT 2006 05 24 07 00 00 1874-99 G co CCGG 98.820 -999.990 ... R5 2006 08 18 14 56 00 -0.2000 100.3100 875.00 845.00 30.00 220607 BKT 2006 05 31 12 34 56 171-99 G co CCGG 124.270 -999.990 ... R5 2006 08 18 10 54 00 -0.2000 100.3100 875.00 845.00 30.00 220614 BKT 2006 05 31 12 34 56 172-99 G co CCGG 123.810 -999.990 ... R5 2006 08 18 11 08 00 -0.2000 100.3100 875.00 845.00 30.00 220615 BKT 2006 06 14 07 10 00 4233-99 G co CCGG 140.440 -999.990 ... R5 2006 08 18 11 23 00 -0.2000 100.3100 875.00 845.00 30.00 220612 BKT 2006 06 14 07 10 00 4234-99 G co CCGG 138.830 -999.990 ... R5 2006 08 18 11 37 00 -0.2000 100.3100 875.00 845.00 30.00 220613 BKT 2006 06 25 07 00 00 2557-99 G co CCGG 76.270 -999.990 ... R5 2006 08 24 12 47 00 -0.2000 100.3100 875.00 845.00 30.00 220937 BKT 2006 06 25 07 00 00 2558-99 G co CCGG 75.690 -999.990 ... R5 2006 08 24 13 01 00 -0.2000 100.3100 875.00 845.00 30.00 220938 BKT 2006 06 29 07 30 00 2839-99 G co CCGG 138.800 -999.990 ... R5 2006 08 24 12 19 00 -0.2000 100.3100 875.00 845.00 30.00 220935 BKT 2006 06 29 07 30 00 2840-99 G co CCGG 135.980 -999.990 ... R5 2006 08 24 12 33 00 -0.2000 100.3100 875.00 845.00 30.00 220936 BKT 2006 07 07 07 00 00 4481-99 G co CCGG 242.350 -999.990 .XC R5 2006 08 25 09 36 00 -0.2000 100.3100 875.00 845.00 30.00 220928 BKT 2006 07 07 07 00 00 4482-99 G co CCGG 241.430 -999.990 .XC R5 2006 08 25 09 50 00 -0.2000 100.3100 875.00 845.00 30.00 220929 BKT 2006 07 12 07 10 00 1683-99 G co CCGG 66.160 -999.990 P.. R5 2006 08 25 09 08 00 -0.2000 100.3100 875.00 845.00 30.00 220930 BKT 2006 07 12 07 10 00 1684-99 G co CCGG 70.610 -999.990 P.. R5 2006 08 25 09 22 00 -0.2000 100.3100 875.00 845.00 30.00 220931 BKT 2006 07 20 07 20 00 227-99 G co CCGG 128.590 -999.990 ... R5 2006 08 24 13 44 00 -0.2000 100.3100 875.00 845.00 30.00 220941 BKT 2006 07 20 07 20 00 228-99 G co CCGG 128.120 -999.990 ... R5 2006 08 24 13 58 00 -0.2000 100.3100 875.00 845.00 30.00 220942 BKT 2006 07 26 07 00 00 3349-99 G co CCGG 109.120 -999.990 ... R5 2006 08 24 13 16 00 -0.2000 100.3100 875.00 845.00 30.00 220939 BKT 2006 07 26 07 00 00 3350-99 G co CCGG 109.850 -999.990 ... R5 2006 08 24 13 30 00 -0.2000 100.3100 875.00 845.00 30.00 220940 BKT 2006 08 03 07 00 00 701-99 G co CCGG 160.900 -999.990 P.. R5 2006 09 19 10 03 00 -0.2000 100.3100 875.00 845.00 30.00 222187 BKT 2006 08 03 07 00 00 702-99 G co CCGG 157.310 -999.990 P.. R5 2006 09 19 10 17 00 -0.2000 100.3100 875.00 845.00 30.00 222188 BKT 2006 08 09 07 00 00 3975-99 G co CCGG 107.830 -999.990 ... R5 2006 09 19 09 06 00 -0.2000 100.3100 875.00 845.00 30.00 222185 BKT 2006 08 09 07 00 00 3976-99 G co CCGG 106.520 -999.990 ... R5 2006 09 19 09 20 00 -0.2000 100.3100 875.00 845.00 30.00 222186 BKT 2006 08 16 07 00 00 3923-99 G co CCGG 191.170 -999.990 ... R5 2006 09 19 09 34 00 -0.2000 100.3100 875.00 845.00 30.00 222207 BKT 2006 08 16 07 00 00 3924-99 G co CCGG 188.910 -999.990 ... R5 2006 09 19 09 48 00 -0.2000 100.3100 875.00 845.00 30.00 222208 BKT 2006 08 23 07 00 00 3891-99 G co CCGG 577.890 -999.990 .NC R5 2006 09 18 15 30 00 -0.2000 100.3100 875.00 845.00 30.00 222209 BKT 2006 08 23 07 00 00 3892-99 G co CCGG 577.650 -999.990 .NC R5 2006 09 18 15 44 00 -0.2000 100.3100 875.00 845.00 30.00 222210 BKT 2006 08 30 07 00 00 1365-99 G co CCGG 100.570 -999.990 ... R5 2006 09 18 11 40 00 -0.2000 100.3100 875.00 845.00 30.00 222199 BKT 2006 08 30 07 00 00 1366-99 G co CCGG 100.310 -999.990 ... R5 2006 09 18 11 54 00 -0.2000 100.3100 875.00 845.00 30.00 222200 BKT 2006 09 03 07 00 00 4571-99 G co CCGG 410.620 -999.990 .NC R5 2006 11 24 12 14 00 -0.2000 100.3100 875.00 845.00 30.00 225202 BKT 2006 09 05 07 00 00 4293-99 G co CCGG 198.350 -999.990 ... R5 2006 09 18 12 36 00 -0.2000 100.3100 875.00 845.00 30.00 222197 BKT 2006 09 05 07 00 00 4294-99 G co CCGG 199.410 -999.990 ... R5 2006 09 18 12 51 00 -0.2000 100.3100 875.00 845.00 30.00 222198 BKT 2006 09 12 07 00 00 297-99 G co CCGG 305.870 -999.990 .XC R5 2006 11 27 11 19 00 -0.2000 100.3100 875.00 845.00 30.00 225178 BKT 2006 09 12 07 00 00 298-99 G co CCGG 307.350 -999.990 .XC R5 2006 11 27 11 33 00 -0.2000 100.3100 875.00 845.00 30.00 225179 BKT 2006 09 20 07 00 00 1999-99 G co CCGG 295.310 -999.990 .XC R5 2006 11 27 10 51 00 -0.2000 100.3100 875.00 845.00 30.00 225180 BKT 2006 09 20 07 00 00 2000-99 G co CCGG 296.010 -999.990 .XC R5 2006 11 27 11 05 00 -0.2000 100.3100 875.00 845.00 30.00 225181 BKT 2006 09 27 07 00 00 2923-99 G co CCGG 200.240 -999.990 ... R5 2006 11 24 11 17 00 -0.2000 100.3100 875.00 845.00 30.00 225203 BKT 2006 09 27 07 00 00 2924-99 G co CCGG 199.040 -999.990 ... R5 2006 11 24 11 31 00 -0.2000 100.3100 875.00 845.00 30.00 225204 BKT 2006 10 10 07 00 00 4143-99 G co CCGG 251.640 -999.990 .XC R5 2006 11 24 10 20 00 -0.2000 100.3100 875.00 845.00 30.00 225198 BKT 2006 10 10 07 00 00 4144-99 G co CCGG 251.750 -999.990 .XC R5 2006 11 24 10 34 00 -0.2000 100.3100 875.00 845.00 30.00 225199 BKT 2006 10 17 07 05 00 2131-99 G co CCGG 711.160 -999.990 .NC R5 2006 11 24 10 48 00 -0.2000 100.3100 875.00 845.00 30.00 225200 BKT 2006 10 17 07 05 00 2132-99 G co CCGG 709.800 -999.990 .NC R5 2006 11 24 11 03 00 -0.2000 100.3100 875.00 845.00 30.00 225201 BKT 2006 11 07 07 00 00 1003-99 G co CCGG 428.510 -999.990 .NC R5 2007 01 10 14 25 00 -0.2000 100.3100 875.00 845.00 30.00 226687 BKT 2006 11 07 07 00 00 1004-99 G co CCGG 425.330 -999.990 .NC R5 2007 01 10 14 39 00 -0.2000 100.3100 875.00 845.00 30.00 226688 BKT 2006 11 14 07 00 00 1209-99 G co CCGG 292.600 -999.990 .XC R5 2007 01 10 13 56 00 -0.2000 100.3100 875.00 845.00 30.00 226689 BKT 2006 11 14 07 00 00 1210-99 G co CCGG 292.090 -999.990 .XC R5 2007 01 10 14 10 00 -0.2000 100.3100 875.00 845.00 30.00 226690 BKT 2006 11 21 07 00 00 4203-99 G co CCGG 249.660 -999.990 .XC R5 2007 01 10 09 24 00 -0.2000 100.3100 875.00 845.00 30.00 226761 BKT 2006 11 21 07 00 00 4204-99 G co CCGG 249.620 -999.990 .XC R5 2007 01 10 09 39 00 -0.2000 100.3100 875.00 845.00 30.00 226762 BKT 2006 11 30 07 00 00 4313-99 G co CCGG 145.730 -999.990 ... R5 2007 01 10 13 28 00 -0.2000 100.3100 875.00 845.00 30.00 226685 BKT 2006 11 30 07 00 00 4314-99 G co CCGG 145.470 -999.990 ... R5 2007 01 10 13 42 00 -0.2000 100.3100 875.00 845.00 30.00 226686 BKT 2006 12 12 07 00 00 3435-99 G co CCGG 124.410 -999.990 ... R5 2007 01 10 14 53 00 -0.2000 100.3100 875.00 845.00 30.00 226691 BKT 2006 12 12 07 00 00 3436-99 G co CCGG 123.570 -999.990 ... R5 2007 01 10 15 07 00 -0.2000 100.3100 875.00 845.00 30.00 226692 BKT 2006 12 19 07 00 00 2869-99 G co CCGG 162.610 -999.990 ... R5 2007 02 07 13 36 00 -0.2000 100.3100 875.00 845.00 30.00 228393 BKT 2006 12 19 07 00 00 2870-99 G co CCGG 161.750 -999.990 ... R5 2007 02 07 13 50 00 -0.2000 100.3100 875.00 845.00 30.00 228394 BKT 2006 12 28 07 00 00 6089-66 G co CCGG 135.590 -999.990 ... R5 2007 02 07 13 08 00 -0.2000 100.3100 875.00 845.00 30.00 228391 BKT 2006 12 28 07 00 00 6090-66 G co CCGG 135.060 -999.990 ... R5 2007 02 07 13 22 00 -0.2000 100.3100 875.00 845.00 30.00 228392 BKT 2007 01 02 07 05 00 2501-99 G co CCGG 140.050 -999.990 ... R5 2007 02 07 12 39 00 -0.2000 100.3100 875.00 845.00 30.00 228389 BKT 2007 01 02 07 05 00 2502-99 G co CCGG 139.860 -999.990 ... R5 2007 02 07 12 53 00 -0.2000 100.3100 875.00 845.00 30.00 228390 BKT 2007 01 09 07 00 00 2075-99 G co CCGG 154.560 -999.990 ... R5 2007 02 07 12 11 00 -0.2000 100.3100 875.00 845.00 30.00 228387 BKT 2007 01 09 07 00 00 2076-99 G co CCGG 154.440 -999.990 ... R5 2007 02 07 12 25 00 -0.2000 100.3100 875.00 845.00 30.00 228388 BKT 2007 01 17 07 00 00 4683-99 G co CCGG 178.940 -999.990 ... R5 2007 03 12 14 41 00 -0.2000 100.3100 875.00 845.00 30.00 230399 BKT 2007 01 17 07 00 00 4684-99 G co CCGG 178.810 -999.990 ... R5 2007 03 12 14 55 00 -0.2000 100.3100 875.00 845.00 30.00 230400 BKT 2007 01 23 07 20 00 4127-99 G co CCGG 106.950 -999.990 ... R5 2007 03 12 14 13 00 -0.2000 100.3100 875.00 845.00 30.00 230397 BKT 2007 01 23 07 20 00 4128-99 G co CCGG 106.880 -999.990 ... R5 2007 03 12 14 27 00 -0.2000 100.3100 875.00 845.00 30.00 230398 BKT 2007 01 30 07 00 00 6203-66 G co CCGG 346.450 -999.990 .XC R5 2007 03 12 13 16 00 -0.2000 100.3100 875.00 845.00 30.00 230395 BKT 2007 01 30 07 00 00 6204-66 G co CCGG 345.160 -999.990 .XC R5 2007 03 12 13 30 00 -0.2000 100.3100 875.00 845.00 30.00 230396 BKT 2007 02 06 07 00 00 1793-99 G co CCGG 192.160 -999.990 ... R5 2007 03 12 13 44 00 -0.2000 100.3100 875.00 845.00 30.00 230393 BKT 2007 02 06 07 00 00 1794-99 G co CCGG 193.440 -999.990 ... R5 2007 03 12 13 58 00 -0.2000 100.3100 875.00 845.00 30.00 230394 BKT 2007 02 14 07 00 00 901-99 G co CCGG 235.830 -999.990 P.C R5 2007 04 12 10 32 00 -0.2000 100.3100 875.00 845.00 30.00 232149 BKT 2007 02 14 07 00 00 902-99 G co CCGG 240.850 -999.990 P.C R5 2007 04 12 10 46 00 -0.2000 100.3100 875.00 845.00 30.00 232150 BKT 2007 02 20 07 00 00 4005-99 G co CCGG 112.020 -999.990 ... R5 2007 04 12 11 00 00 -0.2000 100.3100 875.00 845.00 30.00 232147 BKT 2007 02 20 07 00 00 4006-99 G co CCGG 111.700 -999.990 ... R5 2007 04 12 11 15 00 -0.2000 100.3100 875.00 845.00 30.00 232148 BKT 2007 02 27 07 00 00 2215-99 G co CCGG 125.010 -999.990 ... R5 2007 04 12 11 57 00 -0.2000 100.3100 875.00 845.00 30.00 232151 BKT 2007 02 27 07 00 00 2216-99 G co CCGG 124.960 -999.990 ... R5 2007 04 12 12 12 00 -0.2000 100.3100 875.00 845.00 30.00 232152 BKT 2007 03 06 07 00 00 2497-99 G co CCGG 181.310 -999.990 ... R5 2007 04 12 11 29 00 -0.2000 100.3100 875.00 845.00 30.00 232153 BKT 2007 03 06 07 00 00 2498-99 G co CCGG 182.670 -999.990 ... R5 2007 04 12 11 43 00 -0.2000 100.3100 875.00 845.00 30.00 232154 BKT 2007 03 14 07 00 00 4531-99 G co CCGG 240.020 -999.990 ..C R5 2007 04 13 10 35 00 -0.2000 100.3100 875.00 845.00 30.00 232135 BKT 2007 03 14 07 00 00 4532-99 G co CCGG 239.490 -999.990 ..C R5 2007 04 13 10 49 00 -0.2000 100.3100 875.00 845.00 30.00 232136 BKT 2007 03 20 07 00 00 705-99 G co CCGG 120.010 -999.990 ... R5 2007 04 13 10 07 00 -0.2000 100.3100 875.00 845.00 30.00 232137 BKT 2007 03 20 07 00 00 706-99 G co CCGG 119.980 -999.990 ... R5 2007 04 13 10 21 00 -0.2000 100.3100 875.00 845.00 30.00 232138 BKT 2007 03 27 07 00 00 1847-99 G co CCGG 112.070 -999.990 ... R5 2007 06 07 13 03 00 -0.2000 100.3100 875.00 845.00 30.00 235304 BKT 2007 03 27 07 00 00 1848-99 G co CCGG 113.590 -999.990 ... R5 2007 06 07 13 17 00 -0.2000 100.3100 875.00 845.00 30.00 235305 BKT 2007 05 09 07 00 00 1225-99 G co CCGG 86.080 -999.990 ... R5 2007 06 07 12 06 00 -0.2000 100.3100 875.00 845.00 30.00 235302 BKT 2007 05 09 07 00 00 1226-99 G co CCGG 85.830 -999.990 ... R5 2007 06 07 12 20 00 -0.2000 100.3100 875.00 845.00 30.00 235303 BKT 2007 05 15 07 30 00 1595-99 G co CCGG 95.640 -999.990 ... R5 2007 06 07 13 31 00 -0.2000 100.3100 875.00 845.00 30.00 235306 BKT 2007 05 15 07 30 00 1596-99 G co CCGG 94.890 -999.990 ... R5 2007 06 07 13 45 00 -0.2000 100.3100 875.00 845.00 30.00 235307 BKT 2007 05 22 07 30 00 83-99 G co CCGG 163.770 -999.990 ... R6 2007 06 07 13 17 00 -0.2000 100.3100 875.00 845.00 30.00 235308 BKT 2007 05 22 07 30 00 84-99 G co CCGG 162.220 -999.990 ... R6 2007 06 07 13 32 00 -0.2000 100.3100 875.00 845.00 30.00 235309 BKT 2007 05 29 07 00 00 2793-99 G co CCGG 106.480 -999.990 ... R6 2007 07 05 14 25 00 -0.2000 100.3100 875.00 845.00 30.00 237635 BKT 2007 05 29 07 00 00 2794-99 G co CCGG 106.380 -999.990 ... R6 2007 07 05 14 40 00 -0.2000 100.3100 875.00 845.00 30.00 237636 BKT 2007 06 05 07 05 00 3881-99 G co CCGG 123.320 -999.990 ... R6 2007 07 05 13 56 00 -0.2000 100.3100 875.00 845.00 30.00 237637 BKT 2007 06 05 07 05 00 3882-99 G co CCGG 122.790 -999.990 ... R6 2007 07 05 14 11 00 -0.2000 100.3100 875.00 845.00 30.00 237638 BKT 2007 06 12 07 00 00 1915-99 G co CCGG 78.800 -999.990 ... R5 2007 07 09 13 09 00 -0.2000 100.3100 875.00 845.00 30.00 237715 BKT 2007 06 12 07 00 00 1916-99 G co CCGG 78.150 -999.990 ... R5 2007 07 09 13 23 00 -0.2000 100.3100 875.00 845.00 30.00 237716 BKT 2007 06 20 07 00 00 535-99 G co CCGG 78.750 -999.990 ... R5 2007 07 09 11 10 00 -0.2000 100.3100 875.00 845.00 30.00 237717 BKT 2007 06 20 07 00 00 536-99 G co CCGG 78.790 -999.990 ... R5 2007 07 09 11 25 00 -0.2000 100.3100 875.00 845.00 30.00 237718 BKT 2007 06 26 07 00 00 1353-99 G co CCGG 118.590 -999.990 ... R5 2007 08 06 15 13 00 -0.2000 100.3100 875.00 845.00 30.00 239573 BKT 2007 06 26 07 00 00 1354-99 G co CCGG 118.910 -999.990 ... R5 2007 08 06 15 27 00 -0.2000 100.3100 875.00 845.00 30.00 239574 BKT 2007 07 04 07 00 00 4199-99 G co CCGG 245.050 -999.990 .XC R5 2007 08 06 16 10 00 -0.2000 100.3100 875.00 845.00 30.00 239575 BKT 2007 07 04 07 00 00 4200-99 G co CCGG 243.630 -999.990 .XC R5 2007 08 06 16 24 00 -0.2000 100.3100 875.00 845.00 30.00 239576 BKT 2007 07 10 07 00 00 1559-99 G co CCGG 102.440 -999.990 ... R5 2007 08 06 16 39 00 -0.2000 100.3100 875.00 845.00 30.00 239579 BKT 2007 07 10 07 00 00 1560-99 G co CCGG 102.220 -999.990 ... R5 2007 08 06 16 53 00 -0.2000 100.3100 875.00 845.00 30.00 239580 BKT 2007 07 17 07 00 00 4139-99 G co CCGG 126.420 -999.990 ... R5 2007 08 06 15 42 00 -0.2000 100.3100 875.00 845.00 30.00 239577 BKT 2007 07 17 07 00 00 4140-99 G co CCGG 126.570 -999.990 ... R5 2007 08 06 15 56 00 -0.2000 100.3100 875.00 845.00 30.00 239578 BKT 2007 07 25 07 00 00 2699-99 G co CCGG 84.050 -999.990 ... R5 2007 08 31 10 00 00 -0.2000 100.3100 875.00 845.00 30.00 240706 BKT 2007 07 25 07 00 00 2700-99 G co CCGG 84.340 -999.990 ... R5 2007 08 31 10 14 00 -0.2000 100.3100 875.00 845.00 30.00 240707 BKT 2007 07 31 07 00 00 543-99 G co CCGG 101.120 -999.990 ... R5 2007 08 31 10 28 00 -0.2000 100.3100 875.00 845.00 30.00 240704 BKT 2007 07 31 07 00 00 544-99 G co CCGG 101.560 -999.990 ... R5 2007 08 31 10 43 00 -0.2000 100.3100 875.00 845.00 30.00 240705 BKT 2007 08 07 07 45 00 347-99 G co CCGG 218.840 -999.990 .X. R5 2007 08 31 09 32 00 -0.2000 100.3100 875.00 845.00 30.00 240702 BKT 2007 08 07 07 45 00 348-99 G co CCGG 218.010 -999.990 .X. R5 2007 08 31 09 46 00 -0.2000 100.3100 875.00 845.00 30.00 240703 BKT 2007 08 14 07 00 00 2543-99 G co CCGG 127.500 -999.990 ... R5 2007 09 12 14 44 00 -0.2000 100.3100 875.00 845.00 30.00 240701 BKT 2007 08 21 07 00 00 1775-99 G co CCGG 77.580 -999.990 ... R5 2007 09 24 13 26 00 -0.2000 100.3100 875.00 845.00 30.00 242073 BKT 2007 08 21 07 00 00 1776-99 G co CCGG 77.250 -999.990 ... R5 2007 09 24 13 41 00 -0.2000 100.3100 875.00 845.00 30.00 242074 BKT 2007 08 29 07 00 00 1025-99 G co CCGG 151.670 -999.990 ... R5 2007 09 24 13 55 00 -0.2000 100.3100 875.00 845.00 30.00 242071 BKT 2007 08 29 07 00 00 1026-99 G co CCGG 152.370 -999.990 ... R5 2007 09 24 14 09 00 -0.2000 100.3100 875.00 845.00 30.00 242072 BKT 2007 09 05 07 00 00 4035-99 G co CCGG 117.970 -999.990 P.. R5 2007 09 24 12 58 00 -0.2000 100.3100 875.00 845.00 30.00 242069 BKT 2007 09 05 07 00 00 4036-99 G co CCGG 121.870 -999.990 P.. R5 2007 09 24 13 12 00 -0.2000 100.3100 875.00 845.00 30.00 242070 BKT 2007 09 11 07 00 00 3455-99 G co CCGG 98.760 -999.990 ... R5 2007 09 24 12 30 00 -0.2000 100.3100 875.00 845.00 30.00 242067 BKT 2007 09 11 07 00 00 3456-99 G co CCGG 98.180 -999.990 ... R5 2007 09 24 12 44 00 -0.2000 100.3100 875.00 845.00 30.00 242068 BKT 2007 09 19 07 00 00 2025-99 G co CCGG 98.140 -999.990 P.. R5 2007 11 30 11 49 00 -0.2000 100.3100 875.00 845.00 30.00 245464 BKT 2007 09 19 07 00 00 2026-99 G co CCGG 93.090 -999.990 P.. R5 2007 11 30 12 03 00 -0.2000 100.3100 875.00 845.00 30.00 245465 BKT 2007 09 25 07 00 00 1029-99 G co CCGG 142.200 -999.990 ... R5 2007 11 30 12 17 00 -0.2000 100.3100 875.00 845.00 30.00 245462 BKT 2007 09 25 07 00 00 1030-99 G co CCGG 143.570 -999.990 ... R5 2007 11 30 12 32 00 -0.2000 100.3100 875.00 845.00 30.00 245463 BKT 2007 10 02 07 00 00 4721-99 G co CCGG 135.420 -999.990 ... R5 2007 11 30 10 23 00 -0.2000 100.3100 875.00 845.00 30.00 245492 BKT 2007 10 02 07 00 00 4722-99 G co CCGG 135.920 -999.990 ... R5 2007 11 30 10 38 00 -0.2000 100.3100 875.00 845.00 30.00 245493 BKT 2007 10 09 07 00 00 6493-66 G co CCGG 166.340 -999.990 ... R5 2007 11 29 16 32 00 -0.2000 100.3100 875.00 845.00 30.00 245494 BKT 2007 10 09 07 00 00 6494-66 G co CCGG 166.340 -999.990 ... R5 2007 11 29 16 46 00 -0.2000 100.3100 875.00 845.00 30.00 245495 BKT 2007 10 31 07 00 00 2402-99 G co CCGG 87.160 -999.990 ... R5 2007 11 30 11 35 00 -0.2000 100.3100 875.00 845.00 30.00 245459 BKT 2007 10 31 07 00 00 3197-99 G co CCGG 86.920 -999.990 ... R5 2007 11 30 11 20 00 -0.2000 100.3100 875.00 845.00 30.00 245458 BKT 2007 11 06 07 00 00 2431-99 G co CCGG 97.300 -999.990 ... R5 2007 11 30 11 06 00 -0.2000 100.3100 875.00 845.00 30.00 245461 BKT 2007 11 06 07 00 00 687-99 G co CCGG 96.160 -999.990 ... R5 2007 11 30 10 52 00 -0.2000 100.3100 875.00 845.00 30.00 245460 BKT 2007 11 13 07 00 00 3902-99 G co CCGG 107.830 -999.990 ... R5 2007 12 18 12 03 00 -0.2000 100.3100 875.00 845.00 30.00 246541 BKT 2007 11 13 07 00 00 4180-99 G co CCGG 108.930 -999.990 ... R5 2007 12 18 11 49 00 -0.2000 100.3100 875.00 845.00 30.00 246542 BKT 2007 11 20 07 00 00 4356-99 G co CCGG 96.610 -999.990 P.. R5 2007 12 18 12 17 00 -0.2000 100.3100 875.00 845.00 30.00 246540 BKT 2007 11 20 07 00 00 672-99 G co CCGG 101.640 -999.990 P.. R5 2007 12 18 12 31 00 -0.2000 100.3100 875.00 845.00 30.00 246539 BKT 2007 11 28 07 00 00 4598-99 G co CCGG 101.700 -999.990 ... R5 2008 01 03 13 34 00 -0.2000 100.3100 875.00 845.00 30.00 246536 BKT 2007 12 04 07 08 00 1983-99 G co CCGG 133.150 -999.990 ... R5 2007 12 18 11 20 00 -0.2000 100.3100 875.00 845.00 30.00 246537 BKT 2007 12 04 07 08 00 1984-99 G co CCGG 134.190 -999.990 ... R5 2007 12 18 11 34 00 -0.2000 100.3100 875.00 845.00 30.00 246538 BKT 2007 12 12 07 00 00 3723-99 G co CCGG 122.640 -999.990 ... R5 2008 01 22 16 48 00 -0.2000 100.3200 875.00 845.00 30.00 248058 BKT 2007 12 12 07 00 00 3724-99 G co CCGG 122.990 -999.990 ... R5 2008 01 22 17 02 00 -0.2000 100.3200 875.00 845.00 30.00 248059 BKT 2007 12 19 07 00 00 1257-99 G co CCGG 110.640 -999.990 ... R5 2008 01 22 16 19 00 -0.2000 100.3200 875.00 845.00 30.00 248060 BKT 2007 12 19 07 00 00 1258-99 G co CCGG 110.720 -999.990 ... R5 2008 01 22 16 34 00 -0.2000 100.3200 875.00 845.00 30.00 248061 BKT 2007 12 25 07 20 00 3173-99 G co CCGG 103.620 -999.990 ... V2 2008 01 23 10 52 00 -0.2000 100.3200 875.00 845.00 30.00 248062 BKT 2007 12 25 07 20 00 3174-99 G co CCGG 103.780 -999.990 ... V2 2008 01 23 11 07 00 -0.2000 100.3200 875.00 845.00 30.00 248063 BKT 2008 01 01 07 00 00 7-99 G co CCGG 173.780 -999.990 ... V2 2008 01 23 10 21 00 -0.2000 100.3200 875.00 845.00 30.00 248064 BKT 2008 01 01 07 00 00 8-99 G co CCGG 173.830 -999.990 ... V2 2008 01 23 10 36 00 -0.2000 100.3200 875.00 845.00 30.00 248065 BKT 2008 01 08 07 00 00 1193-99 G co CCGG 194.370 -999.990 ... V2 2008 02 28 09 42 00 -0.2000 100.3200 875.00 845.00 30.00 249973 BKT 2008 01 08 07 00 00 1194-99 G co CCGG 194.270 -999.990 ... V2 2008 02 28 09 58 00 -0.2000 100.3200 875.00 845.00 30.00 249974 BKT 2008 01 16 07 00 00 3969-99 G co CCGG 106.930 -999.990 ... V2 2008 02 27 15 07 00 -0.2000 100.3200 875.00 845.00 30.00 249975 BKT 2008 01 16 07 00 00 3970-99 G co CCGG 107.750 -999.990 ... V2 2008 02 27 15 22 00 -0.2000 100.3200 875.00 845.00 30.00 249976 BKT 2008 01 22 14 00 00 2867-99 G co CCGG 192.290 -999.990 ... V2 2008 02 27 14 05 00 -0.2000 100.3200 875.00 845.00 30.00 249969 BKT 2008 01 22 14 00 00 2868-99 G co CCGG 192.590 -999.990 ... V2 2008 02 27 14 20 00 -0.2000 100.3200 875.00 845.00 30.00 249970 BKT 2008 01 29 07 00 00 4759-99 G co CCGG 118.540 -999.990 ... V2 2008 02 27 14 36 00 -0.2000 100.3200 875.00 845.00 30.00 249971 BKT 2008 01 29 07 00 00 4760-99 G co CCGG 118.650 -999.990 ... V2 2008 02 27 14 51 00 -0.2000 100.3200 875.00 845.00 30.00 249972 BKT 2008 02 05 07 00 00 4143-99 G co CCGG 150.190 -999.990 ... V2 2008 03 12 14 08 00 -0.2000 100.3200 875.00 845.00 30.00 250666 BKT 2008 02 05 07 00 00 4144-99 G co CCGG 150.610 -999.990 ... V2 2008 03 12 14 23 00 -0.2000 100.3200 875.00 845.00 30.00 250667 BKT 2008 02 12 07 00 00 603-99 G co CCGG 303.750 -999.990 .XC V2 2008 03 12 15 09 00 -0.2000 100.3200 875.00 845.00 30.00 250668 BKT 2008 02 12 07 00 00 604-99 G co CCGG 303.950 -999.990 .XC V2 2008 03 12 15 25 00 -0.2000 100.3200 875.00 845.00 30.00 250669 BKT 2008 02 19 07 00 00 2359-99 G co CCGG 401.490 -999.990 .NC V2 2008 03 12 09 54 00 -0.2000 100.3200 875.00 845.00 30.00 250642 BKT 2008 02 19 07 00 00 2360-99 G co CCGG 401.590 -999.990 .NC V2 2008 03 12 10 09 00 -0.2000 100.3200 875.00 845.00 30.00 250643 BKT 2008 02 26 07 00 00 1063-99 G co CCGG 189.770 -999.990 ... V2 2008 03 12 10 25 00 -0.2000 100.3200 875.00 845.00 30.00 250644 BKT 2008 02 26 07 00 00 1064-99 G co CCGG 188.510 -999.990 ... V2 2008 03 12 10 40 00 -0.2000 100.3200 875.00 845.00 30.00 250645 BKT 2008 03 04 07 00 00 811-99 G co CCGG 116.290 -999.990 ... R5 2008 04 09 09 45 00 -0.2000 100.3200 875.00 845.00 30.00 252020 BKT 2008 03 04 07 00 00 812-99 G co CCGG 115.480 -999.990 ... R5 2008 04 09 09 59 00 -0.2000 100.3200 875.00 845.00 30.00 252021 BKT 2008 03 11 07 00 00 1087-99 G co CCGG 137.670 -999.990 ... R5 2008 04 08 16 14 00 -0.2000 100.3200 875.00 845.00 30.00 252018 BKT 2008 03 11 07 00 00 1088-99 G co CCGG 138.550 -999.990 ... R5 2008 04 08 16 29 00 -0.2000 100.3200 875.00 845.00 30.00 252019 BKT 2008 03 18 07 00 00 4013-99 G co CCGG 103.710 -999.990 ... R5 2008 04 08 15 17 00 -0.2000 100.3200 875.00 845.00 30.00 252014 BKT 2008 03 18 07 00 00 4014-99 G co CCGG 102.560 -999.990 ... R5 2008 04 08 15 32 00 -0.2000 100.3200 875.00 845.00 30.00 252015 BKT 2008 03 25 07 00 00 885-99 G co CCGG 110.830 -999.990 ... R5 2008 04 08 15 46 00 -0.2000 100.3200 875.00 845.00 30.00 252016 BKT 2008 03 25 07 00 00 886-99 G co CCGG 111.350 -999.990 ... R5 2008 04 08 16 00 00 -0.2000 100.3200 875.00 845.00 30.00 252017 BKT 2008 04 01 07 00 00 3307-99 G co CCGG 133.320 -999.990 ... V2 2008 07 03 11 07 00 -0.2000 100.3200 875.00 845.00 30.00 256698 BKT 2008 04 01 07 00 00 3308-99 G co CCGG 132.990 -999.990 ... V2 2008 07 03 11 23 00 -0.2000 100.3200 875.00 845.00 30.00 256699 BKT 2008 04 08 07 00 00 2829-99 G co CCGG 120.170 -999.990 ... V2 2008 07 02 15 15 00 -0.2000 100.3200 875.00 845.00 30.00 256696 BKT 2008 04 08 07 00 00 2830-99 G co CCGG 109.540 -999.990 ... V2 2008 07 02 15 30 00 -0.2000 100.3200 875.00 845.00 30.00 256697 BKT 2008 04 15 07 00 00 2429-99 G co CCGG 113.580 -999.990 ... V2 2008 07 02 14 14 00 -0.2000 100.3200 875.00 845.00 30.00 256692 BKT 2008 04 15 07 00 00 2430-99 G co CCGG 114.270 -999.990 ... V2 2008 07 02 14 29 00 -0.2000 100.3200 875.00 845.00 30.00 256693 BKT 2008 04 22 07 00 00 355-99 G co CCGG 91.900 -999.990 ... V2 2008 07 02 14 44 00 -0.2000 100.3200 875.00 845.00 30.00 256694 BKT 2008 04 22 07 00 00 356-99 G co CCGG 91.430 -999.990 ... V2 2008 07 02 15 00 00 -0.2000 100.3200 875.00 845.00 30.00 256695 BKT 2008 04 29 07 00 00 909-99 G co CCGG 90.640 -999.990 ... V2 2008 06 17 15 51 00 -0.2000 100.3200 875.00 845.00 30.00 255758 BKT 2008 04 29 07 00 00 910-99 G co CCGG 87.820 -999.990 ... V2 2008 06 17 16 06 00 -0.2000 100.3200 875.00 845.00 30.00 255759 BKT 2008 05 06 07 00 00 1993-99 G co CCGG 116.510 -999.990 ... V2 2008 06 17 14 19 00 -0.2000 100.3200 875.00 845.00 30.00 255760 BKT 2008 05 06 07 00 00 1994-99 G co CCGG 116.690 -999.990 ... V2 2008 06 17 14 34 00 -0.2000 100.3200 875.00 845.00 30.00 255761 BKT 2008 05 13 07 00 00 3979-99 G co CCGG 117.780 -999.990 ... V2 2008 06 17 13 48 00 -0.2000 100.3200 875.00 845.00 30.00 255754 BKT 2008 05 13 07 00 00 3980-99 G co CCGG 118.660 -999.990 ... V2 2008 06 17 14 03 00 -0.2000 100.3200 875.00 845.00 30.00 255755 BKT 2008 05 20 07 00 00 2835-99 G co CCGG 178.690 -999.990 ... V2 2008 06 17 13 17 00 -0.2000 100.3200 875.00 845.00 30.00 255756 BKT 2008 05 20 07 00 00 2836-99 G co CCGG 178.290 -999.990 ... V2 2008 06 17 13 33 00 -0.2000 100.3200 875.00 845.00 30.00 255757 BKT 2008 05 27 07 00 00 3715-99 G co CCGG 152.210 -999.990 P.. V2 2008 07 10 16 09 00 -0.2000 100.3200 875.00 845.00 30.00 257174 BKT 2008 05 27 07 00 00 4487-99 G co CCGG 142.830 -999.990 P.. V2 2008 07 10 15 54 00 -0.2000 100.3200 875.00 845.00 30.00 257173 BKT 2008 06 03 07 00 00 2887-99 G co CCGG 132.960 -999.990 ... R5 2008 07 10 12 36 00 -0.2000 100.3200 875.00 845.00 30.00 257175 BKT 2008 06 03 07 00 00 2888-99 G co CCGG 134.700 -999.990 ... R5 2008 07 10 12 51 00 -0.2000 100.3200 875.00 845.00 30.00 257176 BKT 2008 06 12 07 10 00 3255-99 G co CCGG 111.470 -999.990 ... R5 2008 07 09 11 23 00 -0.2000 100.3200 875.00 845.00 30.00 257076 BKT 2008 06 12 07 10 00 3256-99 G co CCGG 111.690 -999.990 ... R5 2008 07 09 11 38 00 -0.2000 100.3200 875.00 845.00 30.00 257077 BKT 2008 06 17 06 55 00 773-99 G co CCGG 202.510 -999.990 .X. R5 2008 07 09 10 55 00 -0.2000 100.3200 875.00 845.00 30.00 257074 BKT 2008 06 17 06 55 00 774-99 G co CCGG 201.300 -999.990 .X. R5 2008 07 09 11 09 00 -0.2000 100.3200 875.00 845.00 30.00 257075 BKT 2008 06 24 07 00 00 3001-99 G co CCGG 100.780 -999.990 ... V2 2008 08 05 15 26 00 -0.2000 100.3200 875.00 845.00 30.00 258583 BKT 2008 06 24 07 00 00 3002-99 G co CCGG 99.650 -999.990 ... V2 2008 08 05 15 42 00 -0.2000 100.3200 875.00 845.00 30.00 258584 BKT 2008 07 01 07 23 00 2471-99 G co CCGG 108.830 -999.990 ... V2 2008 08 05 15 57 00 -0.2000 100.3200 875.00 845.00 30.00 258581 BKT 2008 07 01 07 23 00 2472-99 G co CCGG 107.200 -999.990 ... V2 2008 08 05 16 12 00 -0.2000 100.3200 875.00 845.00 30.00 258582 BKT 2008 07 08 07 00 00 4549-99 G co CCGG 78.150 -999.990 ... V2 2008 08 05 14 25 00 -0.2000 100.3200 875.00 845.00 30.00 258587 BKT 2008 07 08 07 00 00 4550-99 G co CCGG 78.290 -999.990 ... V2 2008 08 05 14 40 00 -0.2000 100.3200 875.00 845.00 30.00 258588 BKT 2008 07 15 06 57 00 3215-99 G co CCGG 98.280 -999.990 ... V2 2008 08 05 14 56 00 -0.2000 100.3200 875.00 845.00 30.00 258585 BKT 2008 07 15 06 57 00 3216-99 G co CCGG 98.440 -999.990 ... V2 2008 08 05 15 11 00 -0.2000 100.3200 875.00 845.00 30.00 258586 BKT 2008 07 22 07 16 00 3909-99 G co CCGG 77.620 -999.990 ... R5 2008 09 17 15 25 00 -0.2000 100.3200 875.00 845.00 30.00 260945 BKT 2008 07 22 07 16 00 3910-99 G co CCGG 77.780 -999.990 ... R5 2008 09 17 15 39 00 -0.2000 100.3200 875.00 845.00 30.00 260946 BKT 2008 07 29 06 59 00 4707-99 G co CCGG 163.960 -999.990 ... R5 2008 09 17 15 53 00 -0.2000 100.3200 875.00 845.00 30.00 260943 BKT 2008 07 29 06 59 00 4708-99 G co CCGG 164.710 -999.990 ... R5 2008 09 17 16 07 00 -0.2000 100.3200 875.00 845.00 30.00 260944 BKT 2008 08 05 07 00 00 4117-99 G co CCGG 264.730 -999.990 .XC R5 2008 09 17 16 22 00 -0.2000 100.3200 875.00 845.00 30.00 260947 BKT 2008 08 05 07 00 00 4118-99 G co CCGG 264.070 -999.990 .XC R5 2008 09 17 16 36 00 -0.2000 100.3200 875.00 845.00 30.00 260948 BKT 2008 08 12 07 00 00 727-99 G co CCGG 147.620 -999.990 ... R5 2008 09 17 16 50 00 -0.2000 100.3200 875.00 845.00 30.00 260949 BKT 2008 08 12 07 00 00 728-99 G co CCGG 146.930 -999.990 ... R5 2008 09 17 17 05 00 -0.2000 100.3200 875.00 845.00 30.00 260950 BKT 2008 08 19 06 54 00 2779-99 G co CCGG 165.520 -999.990 ... R5 2008 09 29 14 39 00 -0.2000 100.3200 875.00 845.00 30.00 261658 BKT 2008 08 19 06 54 00 2780-99 G co CCGG 162.290 -999.990 ... R5 2008 09 29 14 53 00 -0.2000 100.3200 875.00 845.00 30.00 261659 BKT 2008 08 26 06 57 00 809-99 G co CCGG 123.110 -999.990 ... R5 2008 09 29 15 36 00 -0.2000 100.3200 875.00 845.00 30.00 261660 BKT 2008 08 26 06 57 00 810-99 G co CCGG 123.410 -999.990 ... R5 2008 09 29 15 51 00 -0.2000 100.3200 875.00 845.00 30.00 261661 BKT 2008 09 02 07 00 00 2035-99 G co CCGG 96.340 -999.990 ... R5 2008 09 29 14 11 00 -0.2000 100.3200 875.00 845.00 30.00 261656 BKT 2008 09 02 07 00 00 2036-99 G co CCGG 96.330 -999.990 ... R5 2008 09 29 14 25 00 -0.2000 100.3200 875.00 845.00 30.00 261657 BKT 2008 09 09 07 00 00 4207-99 G co CCGG 83.270 -999.990 ... R5 2008 09 29 15 08 00 -0.2000 100.3200 875.00 845.00 30.00 261662 BKT 2008 09 09 07 00 00 4208-99 G co CCGG 83.000 -999.990 ... R5 2008 09 29 15 22 00 -0.2000 100.3200 875.00 845.00 30.00 261663 BKT 2008 09 16 07 00 00 4101-99 G co CCGG 77.960 -999.990 ... V2 2008 10 24 15 13 00 -0.2000 100.3200 875.00 845.00 30.00 262833 BKT 2008 09 16 07 00 00 4102-99 G co CCGG 77.640 -999.990 ... V2 2008 10 24 15 28 00 -0.2000 100.3200 875.00 845.00 30.00 262834 BKT 2008 09 23 06 57 00 5015-99 G co CCGG 165.420 -999.990 ... V2 2008 10 24 15 44 00 -0.2000 100.3200 875.00 845.00 30.00 262835 BKT 2008 09 23 06 57 00 5016-99 G co CCGG 169.030 -999.990 ... V2 2008 10 24 15 59 00 -0.2000 100.3200 875.00 845.00 30.00 262836 BKT 2008 09 30 07 00 00 919-99 G co CCGG 93.360 -999.990 ... V2 2008 10 24 14 11 00 -0.2000 100.3200 875.00 845.00 30.00 262829 BKT 2008 09 30 07 00 00 920-99 G co CCGG 93.060 -999.990 ... V2 2008 10 24 14 27 00 -0.2000 100.3200 875.00 845.00 30.00 262830 BKT 2008 10 07 07 00 00 1863-99 G co CCGG 102.040 -999.990 ... V2 2008 10 24 14 42 00 -0.2000 100.3200 875.00 845.00 30.00 262831 BKT 2008 10 07 07 00 00 1864-99 G co CCGG 101.770 -999.990 ... V2 2008 10 24 14 58 00 -0.2000 100.3200 875.00 845.00 30.00 262832 BKT 2008 10 21 07 00 00 3409-99 G co CCGG 116.080 -999.990 ... V2 2008 12 10 11 56 00 -0.2000 100.3200 875.00 845.00 30.00 265177 BKT 2008 10 21 07 00 00 3410-99 G co CCGG 117.200 -999.990 ... V2 2008 12 10 12 12 00 -0.2000 100.3200 875.00 845.00 30.00 265178 BKT 2008 10 28 07 00 00 3177-99 G co CCGG 130.410 -999.990 ... V2 2008 12 10 11 26 00 -0.2000 100.3200 875.00 845.00 30.00 265175 BKT 2008 10 28 07 00 00 3178-99 G co CCGG 130.720 -999.990 ... V2 2008 12 10 11 41 00 -0.2000 100.3200 875.00 845.00 30.00 265176 BKT 2008 11 04 07 00 00 2387-99 G co CCGG 112.370 -999.990 ... V2 2008 12 04 11 46 00 -0.2000 100.3200 875.00 845.00 30.00 264994 BKT 2008 11 04 07 00 00 2388-99 G co CCGG 112.520 -999.990 ... V2 2008 12 04 12 02 00 -0.2000 100.3200 875.00 845.00 30.00 264995 BKT 2008 11 11 07 00 00 1811-99 G co CCGG 83.810 -999.990 ... V2 2008 12 04 12 33 00 -0.2000 100.3200 875.00 845.00 30.00 264996 BKT 2008 11 11 07 00 00 1812-99 G co CCGG 83.890 -999.990 ... V2 2008 12 04 12 17 00 -0.2000 100.3200 875.00 845.00 30.00 264997 BKT 2008 11 18 07 00 00 2707-99 G co CCGG 120.700 -999.990 ... V2 2009 01 28 11 56 00 -0.2000 100.3200 875.00 845.00 30.00 268161 BKT 2008 11 18 07 00 00 2708-99 G co CCGG 121.620 -999.990 ... V2 2009 01 28 12 11 00 -0.2000 100.3200 875.00 845.00 30.00 268162 BKT 2008 11 25 06 58 00 1203-99 G co CCGG 85.730 -999.990 ... V2 2009 01 28 12 27 00 -0.2000 100.3200 875.00 845.00 30.00 268163 BKT 2008 11 25 06 58 00 1204-99 G co CCGG 85.580 -999.990 ... V2 2009 01 28 12 42 00 -0.2000 100.3200 875.00 845.00 30.00 268164 BKT 2008 12 02 07 00 00 3491-99 G co CCGG 142.510 -999.990 P.. V2 2009 01 28 16 02 00 -0.2000 100.3200 875.00 845.00 30.00 268169 BKT 2008 12 02 07 00 00 3492-99 G co CCGG 127.600 -999.990 P.. V2 2009 01 28 16 17 00 -0.2000 100.3200 875.00 845.00 30.00 268170 BKT 2008 12 09 07 00 00 2051-99 G co CCGG 111.710 -999.990 ... V2 2009 01 28 16 33 00 -0.2000 100.3200 875.00 845.00 30.00 268171 BKT 2008 12 09 07 00 00 2052-99 G co CCGG 111.970 -999.990 ... V2 2009 01 28 16 48 00 -0.2000 100.3200 875.00 845.00 30.00 268172 BKT 2008 12 16 06 51 00 4497-99 G co CCGG 91.840 -999.990 ... V2 2009 02 09 13 56 00 -0.2000 100.3200 875.00 845.00 30.00 269124 BKT 2008 12 16 06 51 00 4498-99 G co CCGG 92.530 -999.990 ... V2 2009 02 09 14 11 00 -0.2000 100.3200 875.00 845.00 30.00 269125 BKT 2008 12 23 06 58 00 165-99 G co CCGG 165.360 -999.990 ... V2 2009 02 09 13 25 00 -0.2000 100.3200 875.00 845.00 30.00 269126 BKT 2008 12 23 06 58 00 166-99 G co CCGG 166.000 -999.990 ... V2 2009 02 09 13 40 00 -0.2000 100.3200 875.00 845.00 30.00 269127 BKT 2008 12 30 07 00 00 3471-99 G co CCGG 113.570 -999.990 ... V2 2009 02 09 14 57 00 -0.2000 100.3200 875.00 845.00 30.00 269128 BKT 2008 12 30 07 00 00 3472-99 G co CCGG 112.850 -999.990 ... V2 2009 02 09 15 13 00 -0.2000 100.3200 875.00 845.00 30.00 269129 BKT 2009 01 06 06 58 00 245-99 G co CCGG 103.410 -999.990 ... V2 2009 02 09 14 27 00 -0.2000 100.3200 875.00 845.00 30.00 269130 BKT 2009 01 06 06 58 00 246-99 G co CCGG 103.670 -999.990 ... V2 2009 02 09 14 42 00 -0.2000 100.3200 875.00 845.00 30.00 269131 BKT 2009 01 13 07 00 00 3783-99 G co CCGG 235.770 -999.990 ..C R5 2009 02 24 12 31 00 -0.2000 100.3200 875.00 845.00 30.00 270158 BKT 2009 01 13 07 00 00 3784-99 G co CCGG 235.320 -999.990 ..C R5 2009 02 24 12 45 00 -0.2000 100.3200 875.00 845.00 30.00 270159 BKT 2009 01 20 07 00 00 2149-99 G co CCGG 294.710 -999.990 .XC R5 2009 02 24 13 28 00 -0.2000 100.3200 875.00 845.00 30.00 270160 BKT 2009 01 20 07 00 00 2150-99 G co CCGG 294.310 -999.990 .XC R5 2009 02 24 13 42 00 -0.2000 100.3200 875.00 845.00 30.00 270161 BKT 2009 01 26 07 00 00 3857-99 G co CCGG 293.320 -999.990 .XC R5 2009 02 24 12 59 00 -0.2000 100.3200 875.00 845.00 30.00 270162 BKT 2009 01 26 07 00 00 3858-99 G co CCGG 288.860 -999.990 .XC R5 2009 02 24 13 14 00 -0.2000 100.3200 875.00 845.00 30.00 270163 BKT 2009 02 03 07 00 00 2017-99 G co CCGG 141.130 -999.990 ... R5 2009 02 24 13 57 00 -0.2000 100.3200 875.00 845.00 30.00 270164 BKT 2009 02 03 07 00 00 2018-99 G co CCGG 141.060 -999.990 ... R5 2009 02 24 14 11 00 -0.2000 100.3200 875.00 845.00 30.00 270165 BKT 2009 02 10 07 00 00 2683-99 G co CCGG 140.530 -999.990 ... V2 2009 03 30 16 10 00 -0.2000 100.3200 875.00 845.00 30.00 272282 BKT 2009 02 10 07 00 00 2684-99 G co CCGG 138.890 -999.990 ... V2 2009 03 30 16 25 00 -0.2000 100.3200 875.00 845.00 30.00 272283 BKT 2009 02 17 07 00 00 1107-99 G co CCGG 293.490 -999.990 .XC V2 2009 03 31 10 32 00 -0.2000 100.3200 875.00 845.00 30.00 272284 BKT 2009 02 17 07 00 00 1108-99 G co CCGG 293.270 -999.990 .XC V2 2009 03 31 10 47 00 -0.2000 100.3200 875.00 845.00 30.00 272285 BKT 2009 02 24 07 00 00 1031-99 G co CCGG 153.740 -999.990 ... R5 2009 03 30 16 04 00 -0.2000 100.3200 875.00 845.00 30.00 272278 BKT 2009 02 24 07 00 00 1032-99 G co CCGG 153.960 -999.990 ... R5 2009 03 30 16 18 00 -0.2000 100.3200 875.00 845.00 30.00 272279 BKT 2009 03 03 07 00 00 3693-99 G co CCGG 114.330 -999.990 ... R5 2009 03 30 15 36 00 -0.2000 100.3200 875.00 845.00 30.00 272280 BKT 2009 03 03 07 00 00 3694-99 G co CCGG 115.540 -999.990 ... R5 2009 03 30 15 50 00 -0.2000 100.3200 875.00 845.00 30.00 272281 BKT 2009 03 10 07 00 00 4969-99 G co CCGG 152.340 -999.990 ... V2 2009 04 25 14 54 00 -0.2000 100.3200 875.00 845.00 30.00 274304 BKT 2009 03 10 07 00 00 4970-99 G co CCGG 151.630 -999.990 ... V2 2009 04 25 15 09 00 -0.2000 100.3200 875.00 845.00 30.00 274305 BKT 2009 03 17 07 00 00 3217-99 G co CCGG 97.590 -999.990 ... V2 2009 04 25 14 23 00 -0.2000 100.3200 875.00 845.00 30.00 274306 BKT 2009 03 17 07 00 00 3218-99 G co CCGG 97.050 -999.990 ... V2 2009 04 25 14 38 00 -0.2000 100.3200 875.00 845.00 30.00 274307 BKT 2009 03 24 07 00 00 3211-99 G co CCGG 200.430 -999.990 ... V2 2009 04 25 15 24 00 -0.2000 100.3200 875.00 845.00 30.00 274310 BKT 2009 03 24 07 00 00 3212-99 G co CCGG 201.040 -999.990 ... V2 2009 04 25 15 40 00 -0.2000 100.3200 875.00 845.00 30.00 274311 BKT 2009 03 31 07 00 00 3499-99 G co CCGG 147.950 -999.990 ... V2 2009 04 25 15 55 00 -0.2000 100.3200 875.00 845.00 30.00 274308 BKT 2009 03 31 07 00 00 3500-99 G co CCGG 148.090 -999.990 ... V2 2009 04 25 16 11 00 -0.2000 100.3200 875.00 845.00 30.00 274309 BKT 2009 04 07 07 00 00 2667-99 G co CCGG 120.600 -999.990 ... V2 2009 06 29 13 30 00 -0.2000 100.3200 875.00 845.00 30.00 277469 BKT 2009 04 07 07 00 00 2668-99 G co CCGG 119.330 -999.990 ... V2 2009 06 29 13 45 00 -0.2000 100.3200 875.00 845.00 30.00 277470 BKT 2009 04 14 07 00 00 1743-99 G co CCGG 114.270 -999.990 ... V2 2009 06 29 15 09 00 -0.2000 100.3200 875.00 845.00 30.00 277471 BKT 2009 04 14 07 00 00 1744-99 G co CCGG 113.880 -999.990 ... V2 2009 06 29 15 24 00 -0.2000 100.3200 875.00 845.00 30.00 277472 BKT 2009 04 21 07 00 00 3795-99 G co CCGG 78.910 -999.990 ... V2 2009 06 29 12 59 00 -0.2000 100.3200 875.00 845.00 30.00 277465 BKT 2009 04 21 07 00 00 3796-99 G co CCGG 78.880 -999.990 ... V2 2009 06 29 13 14 00 -0.2000 100.3200 875.00 845.00 30.00 277466 BKT 2009 04 28 07 00 00 1847-99 G co CCGG 114.310 -999.990 ... V2 2009 06 29 12 28 00 -0.2000 100.3200 875.00 845.00 30.00 277467 BKT 2009 04 28 07 00 00 1848-99 G co CCGG 115.040 -999.990 ... V2 2009 06 29 12 44 00 -0.2000 100.3200 875.00 845.00 30.00 277468 BKT 2009 05 05 07 00 00 2911-99 G co CCGG 77.320 -999.990 ... V2 2009 06 30 12 17 00 -0.2000 100.3200 875.00 845.00 30.00 277473 BKT 2009 05 05 07 00 00 2912-99 G co CCGG 78.420 -999.990 ... V2 2009 06 30 12 32 00 -0.2000 100.3200 875.00 845.00 30.00 277474 BKT 2009 05 12 07 00 00 4385-99 G co CCGG 78.440 -999.990 ... V2 2009 06 30 12 48 00 -0.2000 100.3200 875.00 845.00 30.00 277475 BKT 2009 05 12 07 00 00 4386-99 G co CCGG 78.590 -999.990 ... V2 2009 06 30 13 03 00 -0.2000 100.3200 875.00 845.00 30.00 277476 BKT 2009 05 19 07 00 00 3145-99 G co CCGG 87.400 -999.990 ... R5 2009 06 30 13 04 00 -0.2000 100.3200 875.00 845.00 30.00 277477 BKT 2009 05 19 07 00 00 4718-99 G co CCGG 87.480 -999.990 ... R5 2009 06 30 13 18 00 -0.2000 100.3200 875.00 845.00 30.00 277478 BKT 2009 05 26 07 00 00 3173-99 G co CCGG 101.200 -999.990 ... V2 2009 06 30 11 46 00 -0.2000 100.3200 875.00 845.00 30.00 277479 BKT 2009 05 26 07 00 00 4302-99 G co CCGG 99.720 -999.990 ... V2 2009 06 30 12 02 00 -0.2000 100.3200 875.00 845.00 30.00 277480 BKT 2009 06 01 07 00 00 1187-99 G co CCGG 271.660 -999.990 .XC V2 2009 08 07 12 24 00 -0.2000 100.3200 875.00 845.00 30.00 280783 BKT 2009 06 01 07 00 00 1188-99 G co CCGG 273.450 -999.990 .XC V2 2009 08 07 12 40 00 -0.2000 100.3200 875.00 845.00 30.00 280784 BKT 2009 06 09 07 00 00 4593-99 G co CCGG 119.140 -999.990 P.. V2 2009 08 07 13 26 00 -0.2000 100.3200 875.00 845.00 30.00 280785 BKT 2009 06 09 07 00 00 4594-99 G co CCGG 122.960 -999.990 P.. V2 2009 08 07 13 41 00 -0.2000 100.3200 875.00 845.00 30.00 280786 BKT 2009 06 16 07 00 00 75-99 G co CCGG 67.630 -999.990 ... V2 2009 08 07 13 57 00 -0.2000 100.3200 875.00 845.00 30.00 280787 BKT 2009 06 16 07 00 00 76-99 G co CCGG 69.300 -999.990 ... V2 2009 08 07 14 12 00 -0.2000 100.3200 875.00 845.00 30.00 280788 BKT 2009 06 23 07 00 00 553-99 G co CCGG 144.840 -999.990 ... V2 2009 08 07 12 55 00 -0.2000 100.3200 875.00 845.00 30.00 280789 BKT 2009 06 23 07 00 00 554-99 G co CCGG 144.360 -999.990 ... V2 2009 08 07 13 11 00 -0.2000 100.3200 875.00 845.00 30.00 280790 BKT 2009 06 30 07 00 00 2167-99 G co CCGG 182.210 -999.990 ... R5 2009 08 19 13 56 00 -0.2000 100.3200 875.00 845.00 30.00 281637 BKT 2009 06 30 07 00 00 2168-99 G co CCGG 182.420 -999.990 ... R5 2009 08 19 14 10 00 -0.2000 100.3200 875.00 845.00 30.00 281638 BKT 2009 07 07 07 00 00 2055-99 G co CCGG 215.540 -999.990 .X. R5 2009 08 19 12 59 00 -0.2000 100.3200 875.00 845.00 30.00 281639 BKT 2009 07 07 07 00 00 2056-99 G co CCGG 216.490 -999.990 .X. R5 2009 08 19 13 13 00 -0.2000 100.3200 875.00 845.00 30.00 281640 BKT 2009 07 14 07 00 00 3963-99 G co CCGG 89.540 -999.990 ... R5 2009 08 19 13 27 00 -0.2000 100.3200 875.00 845.00 30.00 281641 BKT 2009 07 14 07 00 00 3964-99 G co CCGG 88.900 -999.990 ... R5 2009 08 19 13 41 00 -0.2000 100.3200 875.00 845.00 30.00 281642 BKT 2009 07 21 07 00 00 971-99 G co CCGG 116.430 -999.990 ... R5 2009 08 19 14 24 00 -0.2000 100.3200 875.00 845.00 30.00 281643 BKT 2009 07 21 07 00 00 972-99 G co CCGG 116.590 -999.990 ... R5 2009 08 19 14 38 00 -0.2000 100.3200 875.00 845.00 30.00 281644 BKT 2009 07 28 07 00 00 2199-99 G co CCGG 179.530 -999.990 ... R5 2009 09 14 13 41 00 -0.2020 100.3180 875.00 845.00 30.00 283183 BKT 2009 07 28 07 00 00 2200-99 G co CCGG 177.360 -999.990 ... R5 2009 09 14 13 55 00 -0.2020 100.3180 875.00 845.00 30.00 283184 BKT 2009 08 04 07 00 00 3515-99 G co CCGG 210.260 -999.990 ... R5 2009 09 14 14 10 00 -0.2020 100.3180 875.00 845.00 30.00 283181 BKT 2009 08 04 07 00 00 3516-99 G co CCGG 209.610 -999.990 ... R5 2009 09 14 14 24 00 -0.2020 100.3180 875.00 845.00 30.00 283182 BKT 2009 08 11 07 00 00 1151-99 G co CCGG 107.840 -999.990 ... R5 2009 09 14 13 13 00 -0.2020 100.3180 875.00 845.00 30.00 283179 BKT 2009 08 11 07 00 00 1152-99 G co CCGG 108.360 -999.990 ... R5 2009 09 14 13 27 00 -0.2020 100.3180 875.00 845.00 30.00 283180 BKT 2009 08 18 07 00 00 2389-99 G co CCGG 185.870 -999.990 ... R5 2009 09 14 12 44 00 -0.2020 100.3180 875.00 845.00 30.00 283177 BKT 2009 08 18 07 00 00 2390-99 G co CCGG 188.340 -999.990 ... R5 2009 09 14 12 58 00 -0.2020 100.3180 875.00 845.00 30.00 283178 BKT 2009 08 25 07 00 00 1771-99 G co CCGG 100.760 -999.990 ... V2 2009 10 26 11 52 00 -0.2020 100.3180 875.00 845.00 30.00 285618 BKT 2009 08 25 07 00 00 1772-99 G co CCGG 100.180 -999.990 ... V2 2009 10 26 12 07 00 -0.2020 100.3180 875.00 845.00 30.00 285619 BKT 2009 09 01 07 00 00 2527-99 G co CCGG 97.750 -999.990 ... V2 2009 10 26 12 23 00 -0.2020 100.3180 875.00 845.00 30.00 285620 BKT 2009 09 01 07 00 00 2528-99 G co CCGG 97.790 -999.990 ... V2 2009 10 26 12 38 00 -0.2020 100.3180 875.00 845.00 30.00 285621 BKT 2009 09 08 07 00 00 2651-99 G co CCGG 185.090 -999.990 ... V2 2009 10 26 11 21 00 -0.2020 100.3180 875.00 845.00 30.00 285614 BKT 2009 09 08 07 00 00 2652-99 G co CCGG 184.040 -999.990 ... V2 2009 10 26 11 36 00 -0.2020 100.3180 875.00 845.00 30.00 285615 BKT 2009 09 15 07 00 00 755-99 G co CCGG 93.610 -999.990 ... V2 2009 10 26 10 50 00 -0.2020 100.3180 875.00 845.00 30.00 285616 BKT 2009 09 15 07 00 00 756-99 G co CCGG 92.740 -999.990 ... V2 2009 10 26 11 06 00 -0.2020 100.3180 875.00 845.00 30.00 285617 BKT 2009 09 22 07 00 00 4277-99 G co CCGG 118.430 -999.990 ... V2 2009 12 02 12 05 00 -0.2020 100.3180 875.00 845.00 30.00 286676 BKT 2009 09 22 07 00 00 4278-99 G co CCGG 118.070 -999.990 ... V2 2009 12 02 12 20 00 -0.2020 100.3180 875.00 845.00 30.00 286677 BKT 2009 09 29 07 00 00 2081-99 G co CCGG 85.200 -999.990 ... V2 2009 12 02 12 36 00 -0.2020 100.3180 875.00 845.00 30.00 286678 BKT 2009 09 29 07 00 00 2082-99 G co CCGG 83.830 -999.990 ... V2 2009 12 02 12 51 00 -0.2020 100.3180 875.00 845.00 30.00 286679 BKT 2009 10 06 07 00 00 3167-99 G co CCGG 80.300 -999.990 ... V2 2009 12 02 11 03 00 -0.2020 100.3180 875.00 845.00 30.00 286672 BKT 2009 10 06 07 00 00 3168-99 G co CCGG 83.070 -999.990 ... V2 2009 12 02 11 19 00 -0.2020 100.3180 875.00 845.00 30.00 286673 BKT 2009 10 13 07 01 00 4667-99 G co CCGG 106.600 -999.990 ... V2 2009 12 02 11 34 00 -0.2020 100.3180 875.00 845.00 30.00 286674 BKT 2009 10 13 07 01 00 4668-99 G co CCGG 106.620 -999.990 ... V2 2009 12 02 11 50 00 -0.2020 100.3180 875.00 845.00 30.00 286675 BKT 2009 10 20 07 00 00 4959-99 G co CCGG 205.880 -999.990 ... V2 2010 01 21 11 20 00 -0.2020 100.3180 875.00 845.00 30.00 288620 BKT 2009 10 20 07 00 00 4960-99 G co CCGG 205.920 -999.990 ... V2 2010 01 21 11 35 00 -0.2020 100.3180 875.00 845.00 30.00 288621 BKT 2009 10 27 07 00 00 1269-99 G co CCGG 198.700 -999.990 ... V2 2010 01 21 10 49 00 -0.2020 100.3180 875.00 845.00 30.00 288618 BKT 2009 10 27 07 00 00 1270-99 G co CCGG 197.950 -999.990 ... V2 2010 01 21 11 05 00 -0.2020 100.3180 875.00 845.00 30.00 288619 BKT 2009 11 03 07 00 00 341-99 G co CCGG 151.280 -999.990 ... V2 2010 01 20 16 37 00 -0.2020 100.3180 875.00 845.00 30.00 288616 BKT 2009 11 03 07 00 00 342-99 G co CCGG 152.300 -999.990 ... V2 2010 01 20 16 53 00 -0.2020 100.3180 875.00 845.00 30.00 288617 BKT 2009 11 10 07 00 00 2987-99 G co CCGG 141.000 -999.990 P.. V2 2010 01 20 17 08 00 -0.2020 100.3180 875.00 845.00 30.00 288614 BKT 2009 11 10 07 00 00 2988-99 G co CCGG 137.780 -999.990 P.. V2 2010 01 20 17 23 00 -0.2020 100.3180 875.00 845.00 30.00 288615 BKT 2009 11 17 07 00 00 1307-99 G co CCGG 100.940 -999.990 P.. V2 2010 01 25 12 11 00 -0.2020 100.3180 875.00 845.00 30.00 288894 BKT 2009 11 17 07 00 00 1308-99 G co CCGG 97.560 -999.990 P.. V2 2010 01 25 12 27 00 -0.2020 100.3180 875.00 845.00 30.00 288895 BKT 2009 11 24 12 34 56 3749-99 G co CCGG 81.770 -999.990 ... V2 2010 01 25 12 42 00 -0.2020 100.3180 875.00 845.00 30.00 288896 BKT 2009 11 24 12 34 56 3750-99 G co CCGG 80.080 -999.990 ... V2 2010 01 25 12 57 00 -0.2020 100.3180 875.00 845.00 30.00 288897 BKT 2009 12 01 07 00 00 2747-99 G co CCGG 109.620 -999.990 ... V2 2010 01 25 15 15 00 -0.2020 100.3180 875.00 845.00 30.00 288882 BKT 2009 12 01 07 00 00 2748-99 G co CCGG 108.040 -999.990 ... V2 2010 01 25 15 31 00 -0.2020 100.3180 875.00 845.00 30.00 288883 BKT 2009 12 08 07 00 00 4881-99 G co CCGG 182.120 -999.990 ... V2 2010 01 25 15 46 00 -0.2020 100.3180 875.00 845.00 30.00 288884 BKT 2009 12 08 07 00 00 4882-99 G co CCGG 182.030 -999.990 ... V2 2010 01 25 16 01 00 -0.2020 100.3180 875.00 845.00 30.00 288885 BKT 2009 12 15 07 00 00 895-99 G co CCGG 149.680 -999.990 ... V2 2010 02 24 13 54 00 -0.2020 100.3180 875.00 845.00 30.00 290525 BKT 2009 12 15 07 00 00 896-99 G co CCGG 151.610 -999.990 ... V2 2010 02 24 14 10 00 -0.2020 100.3180 875.00 845.00 30.00 290526 BKT 2009 12 22 07 00 00 87-99 G co CCGG 211.730 -999.990 ... V2 2010 02 24 13 24 00 -0.2020 100.3180 875.00 845.00 30.00 290527 BKT 2009 12 22 07 00 00 88-99 G co CCGG 213.770 -999.990 ... V2 2010 02 24 13 39 00 -0.2020 100.3180 875.00 845.00 30.00 290528 BKT 2009 12 29 07 00 00 2215-99 G co CCGG 108.200 -999.990 ... V2 2010 02 24 14 57 00 -0.2020 100.3180 875.00 845.00 30.00 290529 BKT 2009 12 29 07 00 00 2216-99 G co CCGG 107.970 -999.990 ... V2 2010 02 24 15 12 00 -0.2020 100.3180 875.00 845.00 30.00 290530 BKT 2010 01 05 07 00 00 2457-99 G co CCGG 121.640 -999.990 ... V2 2010 02 24 14 25 00 -0.2020 100.3180 875.00 845.00 30.00 290531 BKT 2010 01 05 07 00 00 2458-99 G co CCGG 120.970 -999.990 ... V2 2010 02 24 14 40 00 -0.2020 100.3180 875.00 845.00 30.00 290532 BKT 2010 01 12 07 00 00 1731-99 G co CCGG 134.830 -999.990 ... V2 2010 03 17 09 34 00 -0.2020 100.3180 875.00 845.00 30.00 291809 BKT 2010 01 12 07 00 00 1732-99 G co CCGG 134.410 -999.990 ... V2 2010 03 17 09 49 00 -0.2020 100.3180 875.00 845.00 30.00 291810 BKT 2010 01 19 07 00 00 3435-99 G co CCGG 115.260 -999.990 ... V2 2010 03 17 09 04 00 -0.2020 100.3180 875.00 845.00 30.00 291811 BKT 2010 01 19 07 00 00 3436-99 G co CCGG 115.510 -999.990 ... V2 2010 03 17 09 19 00 -0.2020 100.3180 875.00 845.00 30.00 291812 BKT 2010 01 26 07 00 00 3293-99 G co CCGG 145.120 -999.990 ... V2 2010 03 16 13 56 00 -0.2020 100.3180 875.00 845.00 30.00 291805 BKT 2010 01 26 07 00 00 3294-99 G co CCGG 144.000 -999.990 ... V2 2010 03 16 14 11 00 -0.2020 100.3180 875.00 845.00 30.00 291806 BKT 2010 02 02 07 00 00 167-99 G co CCGG 159.270 -999.990 ... V2 2010 03 16 13 25 00 -0.2020 100.3180 875.00 845.00 30.00 291807 BKT 2010 02 02 07 00 00 168-99 G co CCGG 158.550 -999.990 ... V2 2010 03 16 13 40 00 -0.2020 100.3180 875.00 845.00 30.00 291808 BKT 2010 02 09 07 00 00 4703-99 G co CCGG 171.100 -999.990 ... R5 2010 04 27 15 39 00 -0.2020 100.3180 875.00 845.00 30.00 295500 BKT 2010 02 09 07 00 00 4704-99 G co CCGG 171.010 -999.990 ... R5 2010 04 27 15 54 00 -0.2020 100.3180 875.00 845.00 30.00 295501 BKT 2010 02 16 07 03 00 3591-99 G co CCGG 184.680 -999.990 ... R5 2010 04 27 15 10 00 -0.2020 100.3180 875.00 845.00 30.00 295502 BKT 2010 02 16 07 03 00 3592-99 G co CCGG 185.170 -999.990 ... R5 2010 04 27 15 24 00 -0.2020 100.3180 875.00 845.00 30.00 295503 BKT 2010 02 23 07 00 00 1977-99 G co CCGG 120.370 -999.990 ... R5 2010 04 27 16 38 00 -0.2020 100.3180 875.00 845.00 30.00 295504 BKT 2010 02 23 07 00 00 1978-99 G co CCGG 119.800 -999.990 ... R5 2010 04 27 16 52 00 -0.2020 100.3180 875.00 845.00 30.00 295505 BKT 2010 03 02 07 00 00 1139-99 G co CCGG 172.310 -999.990 ... R5 2010 04 27 16 08 00 -0.2020 100.3180 875.00 845.00 30.00 295506 BKT 2010 03 02 07 00 00 1140-99 G co CCGG 171.660 -999.990 ... R5 2010 04 27 16 23 00 -0.2020 100.3180 875.00 845.00 30.00 295507 BKT 2010 03 09 07 00 00 725-99 G co CCGG 152.440 -999.990 ... R5 2010 04 28 10 01 00 -0.2020 100.3180 875.00 845.00 30.00 295456 BKT 2010 03 09 07 00 00 726-99 G co CCGG 152.360 -999.990 ... R5 2010 04 28 10 15 00 -0.2020 100.3180 875.00 845.00 30.00 295457 BKT 2010 03 16 07 00 00 2341-99 G co CCGG 122.440 -999.990 ... R5 2010 04 28 10 30 00 -0.2020 100.3180 875.00 845.00 30.00 295458 BKT 2010 03 16 07 00 00 2342-99 G co CCGG 121.340 -999.990 ... R5 2010 04 28 10 45 00 -0.2020 100.3180 875.00 845.00 30.00 295459 BKT 2010 03 23 07 00 00 683-99 G co CCGG 120.980 -999.990 ... R5 2010 04 28 11 29 00 -0.2020 100.3180 875.00 845.00 30.00 295460 BKT 2010 03 23 07 00 00 684-99 G co CCGG 122.010 -999.990 ... R5 2010 04 28 11 44 00 -0.2020 100.3180 875.00 845.00 30.00 295461 BKT 2010 03 30 07 00 00 241-99 G co CCGG 117.300 -999.990 ... R5 2010 04 28 10 59 00 -0.2020 100.3180 875.00 845.00 30.00 295462 BKT 2010 03 30 07 00 00 242-99 G co CCGG 116.320 -999.990 ... R5 2010 04 28 11 14 00 -0.2020 100.3180 875.00 845.00 30.00 295463 BKT 2010 04 06 07 00 00 5101-99 G co CCGG 148.140 -999.990 ... R5 2010 05 26 12 33 00 -0.2020 100.3180 875.00 845.00 30.00 296970 BKT 2010 04 06 07 00 00 5102-99 G co CCGG 147.420 -999.990 ... R5 2010 05 26 12 48 00 -0.2020 100.3180 875.00 845.00 30.00 296971 BKT 2010 04 13 07 08 00 3879-99 G co CCGG 147.560 -999.990 ... R5 2010 05 26 12 04 00 -0.2020 100.3180 875.00 845.00 30.00 296972 BKT 2010 04 13 07 08 00 3880-99 G co CCGG 147.350 -999.990 ... R5 2010 05 26 12 18 00 -0.2020 100.3180 875.00 845.00 30.00 296973 BKT 2010 04 20 07 00 00 2285-99 G co CCGG 76.110 -999.990 ... R5 2010 05 26 15 30 00 -0.2020 100.3180 875.00 845.00 30.00 297040 BKT 2010 04 20 07 00 00 2286-99 G co CCGG 76.420 -999.990 ... R5 2010 05 26 15 44 00 -0.2020 100.3180 875.00 845.00 30.00 297041 BKT 2010 04 27 07 00 00 4001-99 G co CCGG 68.440 -999.990 ... R5 2010 05 26 15 00 00 -0.2020 100.3180 875.00 845.00 30.00 297038 BKT 2010 04 27 07 00 00 4002-99 G co CCGG 68.750 -999.990 ... R5 2010 05 26 15 15 00 -0.2020 100.3180 875.00 845.00 30.00 297039 BKT 2010 05 04 07 00 00 5147-99 G co CCGG 142.790 -999.990 ... V2 2010 06 08 13 56 00 -0.2020 100.3180 875.00 845.00 30.00 298069 BKT 2010 05 04 07 00 00 5148-99 G co CCGG 142.650 -999.990 ... V2 2010 06 08 14 11 00 -0.2020 100.3180 875.00 845.00 30.00 298070 BKT 2010 05 11 07 00 00 5117-99 G co CCGG 134.250 -999.990 ... V2 2010 06 08 13 25 00 -0.2020 100.3180 875.00 845.00 30.00 298071 BKT 2010 05 11 07 00 00 5118-99 G co CCGG 134.270 -999.990 ... V2 2010 06 08 13 40 00 -0.2020 100.3180 875.00 845.00 30.00 298072 BKT 2010 05 18 07 00 00 5145-99 G co CCGG 83.560 -999.990 ... V2 2010 06 08 14 26 00 -0.2020 100.3180 875.00 845.00 30.00 298074 BKT 2010 05 18 07 00 00 5146-99 G co CCGG 83.490 -999.990 ... V2 2010 06 08 14 41 00 -0.2020 100.3180 875.00 845.00 30.00 298075 BKT 2010 05 25 07 00 00 5143-99 G co CCGG 159.300 -999.990 ... V2 2010 06 18 11 08 00 -0.2020 100.3180 875.00 845.00 30.00 298073 BKT 2010 06 01 07 00 00 2149-99 G co CCGG 109.450 -999.990 ... R5 2010 07 06 16 05 00 -0.2020 100.3180 875.00 845.00 30.00 299646 BKT 2010 06 01 07 00 00 2150-99 G co CCGG 109.090 -999.990 ... R5 2010 07 06 16 20 00 -0.2020 100.3180 875.00 845.00 30.00 299647 BKT 2010 06 08 07 00 00 1925-99 G co CCGG 67.890 -999.990 ... R5 2010 07 06 15 36 00 -0.2020 100.3180 875.00 845.00 30.00 299648 BKT 2010 06 08 07 00 00 1926-99 G co CCGG 67.920 -999.990 ... R5 2010 07 06 15 50 00 -0.2020 100.3180 875.00 845.00 30.00 299649 BKT 2010 06 15 07 00 00 4649-99 G co CCGG 89.560 -999.990 ... R5 2010 07 06 17 04 00 -0.2020 100.3180 875.00 845.00 30.00 299650 BKT 2010 06 15 07 00 00 4650-99 G co CCGG 90.260 -999.990 ... R5 2010 07 06 17 18 00 -0.2020 100.3180 875.00 845.00 30.00 299651 BKT 2010 06 22 07 00 00 17-99 G co CCGG 120.200 -999.990 ... R5 2010 07 06 16 34 00 -0.2020 100.3180 875.00 845.00 30.00 299652 BKT 2010 06 22 07 00 00 18-99 G co CCGG 118.750 -999.990 ... R5 2010 07 06 16 49 00 -0.2020 100.3180 875.00 845.00 30.00 299653 BKT 2010 06 29 07 00 00 5051-99 G co CCGG 64.950 -999.990 ... V2 2010 08 10 13 22 00 -0.2020 100.3180 875.00 845.00 30.00 301678 BKT 2010 06 29 07 00 00 5052-99 G co CCGG 65.140 -999.990 ... V2 2010 08 10 13 37 00 -0.2020 100.3180 875.00 845.00 30.00 301679 BKT 2010 07 06 07 00 00 3757-99 G co CCGG 123.970 -999.990 P.. V2 2010 08 10 12 51 00 -0.2020 100.3180 875.00 845.00 30.00 301680 BKT 2010 07 06 07 00 00 3758-99 G co CCGG 120.830 -999.990 P.. V2 2010 08 10 13 07 00 -0.2020 100.3180 875.00 845.00 30.00 301681 BKT 2010 07 13 07 00 00 571-99 G co CCGG 96.680 -999.990 ... V2 2010 08 10 14 23 00 -0.2020 100.3180 875.00 845.00 30.00 301683 BKT 2010 07 13 07 00 00 572-99 G co CCGG 95.890 -999.990 ... V2 2010 08 10 14 38 00 -0.2020 100.3180 875.00 845.00 30.00 301682 BKT 2010 07 20 07 00 00 2957-99 G co CCGG 95.820 -999.990 ... V2 2010 08 10 13 52 00 -0.2020 100.3180 875.00 845.00 30.00 301684 BKT 2010 07 20 07 00 00 2958-99 G co CCGG 96.570 -999.990 ... V2 2010 08 10 14 08 00 -0.2020 100.3180 875.00 845.00 30.00 301685 BKT 2010 07 27 07 00 00 4903-99 G co CCGG 85.640 -999.990 ... V2 2010 09 01 11 13 00 -0.2020 100.3180 875.00 845.00 30.00 302762 BKT 2010 07 27 07 00 00 4904-99 G co CCGG 85.110 -999.990 ... V2 2010 09 01 11 28 00 -0.2020 100.3180 875.00 845.00 30.00 302763 BKT 2010 08 03 07 00 00 1187-99 G co CCGG 123.290 -999.990 ... V2 2010 09 01 10 42 00 -0.2020 100.3180 875.00 845.00 30.00 302764 BKT 2010 08 03 07 00 00 1188-99 G co CCGG 124.230 -999.990 ... V2 2010 09 01 10 58 00 -0.2020 100.3180 875.00 845.00 30.00 302765 BKT 2010 08 10 07 00 00 2791-99 G co CCGG 102.940 -999.990 ... V2 2010 08 30 14 57 00 -0.2020 100.3180 875.00 845.00 30.00 302770 BKT 2010 08 10 07 00 00 2792-99 G co CCGG 102.290 -999.990 ... V2 2010 08 30 15 12 00 -0.2020 100.3180 875.00 845.00 30.00 302771 BKT 2010 08 17 07 00 00 1985-99 G co CCGG 92.180 -999.990 ... V2 2010 08 30 14 26 00 -0.2020 100.3180 875.00 845.00 30.00 302772 BKT 2010 08 17 07 00 00 1986-99 G co CCGG 92.460 -999.990 ... V2 2010 08 30 14 41 00 -0.2020 100.3180 875.00 845.00 30.00 302773 BKT 2010 08 24 07 00 00 1701-99 G co CCGG 94.870 -999.990 P.. R5 2010 10 04 16 26 00 -0.2020 100.3180 875.00 845.00 30.00 304950 BKT 2010 08 24 07 00 00 1702-99 G co CCGG 98.450 -999.990 P.. R5 2010 10 04 16 40 00 -0.2020 100.3180 875.00 845.00 30.00 304951 BKT 2010 08 31 07 04 00 3353-99 G co CCGG 118.490 -999.990 ... R5 2010 10 04 15 56 00 -0.2020 100.3180 875.00 845.00 30.00 304952 BKT 2010 08 31 07 04 00 3354-99 G co CCGG 120.570 -999.990 ... R5 2010 10 04 16 11 00 -0.2020 100.3180 875.00 845.00 30.00 304953 BKT 2010 09 07 07 00 00 4409-99 G co CCGG 149.450 -999.990 ... V2 2010 10 04 13 30 00 -0.2020 100.3180 875.00 845.00 30.00 304932 BKT 2010 09 07 07 00 00 4410-99 G co CCGG 148.340 -999.990 ... V2 2010 10 04 13 45 00 -0.2020 100.3180 875.00 845.00 30.00 304933 BKT 2010 09 14 07 15 00 1541-99 G co CCGG 119.500 -999.990 ... V2 2010 10 04 13 00 00 -0.2020 100.3180 875.00 845.00 30.00 304934 BKT 2010 09 14 07 15 00 1542-99 G co CCGG 120.300 -999.990 ... V2 2010 10 04 13 15 00 -0.2020 100.3180 875.00 845.00 30.00 304935 BKT 2010 09 21 07 00 00 3095-99 G co CCGG 110.250 -999.990 ... V2 2010 10 27 13 24 00 -0.2020 100.3180 875.00 845.00 30.00 306391 BKT 2010 09 21 07 00 00 3096-99 G co CCGG 110.050 -999.990 ... V2 2010 10 27 13 40 00 -0.2020 100.3180 875.00 845.00 30.00 306392 BKT 2010 09 28 07 00 00 4807-99 G co CCGG 86.480 -999.990 ... V2 2010 10 28 10 45 00 -0.2020 100.3180 875.00 845.00 30.00 306397 BKT 2010 09 28 07 00 00 4808-99 G co CCGG 87.120 -999.990 ... V2 2010 10 28 11 00 00 -0.2020 100.3180 875.00 845.00 30.00 306398 BKT 2010 10 05 07 00 00 2303-99 G co CCGG 80.330 -999.990 ... R5 2010 10 27 14 29 00 -0.2020 100.3180 875.00 845.00 30.00 306387 BKT 2010 10 05 07 00 00 2304-99 G co CCGG 80.230 -999.990 ... R5 2010 10 27 14 43 00 -0.2020 100.3180 875.00 845.00 30.00 306388 BKT 2010 10 12 07 00 00 6157-66 G co CCGG 97.690 -999.990 ... V2 2010 10 27 14 56 00 -0.2020 100.3180 875.00 845.00 30.00 306389 BKT 2010 10 12 07 00 00 6158-66 G co CCGG 98.840 -999.990 ... V2 2010 10 27 15 11 00 -0.2020 100.3180 875.00 845.00 30.00 306390 BKT 2010 10 19 07 00 00 2957-99 G co CCGG 143.070 -999.990 ... V2 2010 12 07 12 23 00 -0.2020 100.3180 875.00 845.00 30.00 308292 BKT 2010 10 19 07 00 00 2958-99 G co CCGG 143.330 -999.990 ... V2 2010 12 07 12 39 00 -0.2020 100.3180 875.00 845.00 30.00 308293 BKT 2010 10 26 07 00 00 5097-99 G co CCGG 86.980 -999.990 ... V2 2010 12 07 11 53 00 -0.2020 100.3180 875.00 845.00 30.00 308290 BKT 2010 10 26 07 00 00 5098-99 G co CCGG 86.150 -999.990 ... V2 2010 12 07 12 08 00 -0.2020 100.3180 875.00 845.00 30.00 308291 BKT 2010 11 02 07 00 00 363-99 G co CCGG 81.890 -999.990 P.. V2 2010 12 07 13 00 00 -0.2020 100.3180 875.00 845.00 30.00 308294 BKT 2010 11 02 07 00 00 364-99 G co CCGG 77.410 -999.990 P.. V2 2010 12 07 13 15 00 -0.2020 100.3180 875.00 845.00 30.00 308295 BKT 2010 11 09 07 00 00 1461-99 G co CCGG 83.930 -999.990 ... V2 2010 12 07 13 30 00 -0.2020 100.3180 875.00 845.00 30.00 308296 BKT 2010 11 09 07 00 00 1462-99 G co CCGG 82.440 -999.990 ... V2 2010 12 07 13 46 00 -0.2020 100.3180 875.00 845.00 30.00 308297 BKT 2010 11 16 07 00 00 5085-99 G co CCGG 138.470 -999.990 ... V2 2011 01 18 12 56 00 -0.2020 100.3180 875.00 845.00 30.00 311192 BKT 2010 11 16 07 00 00 5086-99 G co CCGG 138.330 -999.990 ... V2 2011 01 18 13 13 00 -0.2020 100.3180 875.00 845.00 30.00 311193 BKT 2010 11 23 07 00 00 3151-99 G co CCGG 97.430 -999.990 ... V2 2011 01 18 12 24 00 -0.2020 100.3180 875.00 845.00 30.00 311194 BKT 2010 11 23 07 00 00 3152-99 G co CCGG 97.960 -999.990 ... V2 2011 01 18 12 40 00 -0.2020 100.3180 875.00 845.00 30.00 311195 BKT 2010 11 30 07 00 00 4611-99 G co CCGG 108.080 -999.990 ... R5 2011 01 18 15 41 00 -0.2020 100.3180 875.00 845.00 30.00 311118 BKT 2010 11 30 07 00 00 4612-99 G co CCGG 108.380 -999.990 ... R5 2011 01 18 15 56 00 -0.2020 100.3180 875.00 845.00 30.00 311119 BKT 2010 12 07 07 00 00 655-99 G co CCGG 89.100 -999.990 ... R5 2011 01 18 15 12 00 -0.2020 100.3180 875.00 845.00 30.00 311120 BKT 2010 12 07 07 00 00 656-99 G co CCGG 89.980 -999.990 ... R5 2011 01 18 15 26 00 -0.2020 100.3180 875.00 845.00 30.00 311121 BKT 2010 12 14 07 00 00 879-99 G co CCGG 106.390 -999.990 ... V2 2011 01 20 13 08 00 -0.2020 100.3180 875.00 845.00 30.00 311094 BKT 2010 12 14 07 00 00 880-99 G co CCGG 106.850 -999.990 ... V2 2011 01 20 13 24 00 -0.2020 100.3180 875.00 845.00 30.00 311095 BKT 2010 12 21 07 00 00 1857-99 G co CCGG 105.520 -999.990 ... V2 2011 01 20 12 35 00 -0.2020 100.3180 875.00 845.00 30.00 311096 BKT 2010 12 21 07 00 00 1858-99 G co CCGG 104.110 -999.990 ... V2 2011 01 20 12 51 00 -0.2020 100.3180 875.00 845.00 30.00 311097 BKT 2010 12 28 07 00 00 1609-99 G co CCGG 116.320 -999.990 ... R5 2011 01 18 14 13 00 -0.2020 100.3180 875.00 845.00 30.00 311114 BKT 2010 12 28 07 00 00 1610-99 G co CCGG 116.040 -999.990 ... R5 2011 01 18 14 28 00 -0.2020 100.3180 875.00 845.00 30.00 311115 BKT 2011 01 04 07 00 00 441-99 G co CCGG 107.770 -999.990 ... R5 2011 01 18 14 42 00 -0.2020 100.3180 875.00 845.00 30.00 311116 BKT 2011 01 04 07 00 00 442-99 G co CCGG 108.240 -999.990 ... R5 2011 01 18 14 57 00 -0.2020 100.3180 875.00 845.00 30.00 311117 BKT 2011 01 11 07 00 00 1729-99 G co CCGG 107.720 -999.990 ... V2 2011 03 02 11 41 00 -0.2020 100.3180 875.00 845.00 30.00 313213 BKT 2011 01 11 07 00 00 1730-99 G co CCGG 108.120 -999.990 ... V2 2011 03 02 11 57 00 -0.2020 100.3180 875.00 845.00 30.00 313214 BKT 2011 01 18 07 00 00 425-99 G co CCGG 156.900 -999.990 ... V2 2011 03 02 10 36 00 -0.2020 100.3180 875.00 845.00 30.00 313215 BKT 2011 01 18 07 00 00 426-99 G co CCGG 157.400 -999.990 ... V2 2011 03 02 10 52 00 -0.2020 100.3180 875.00 845.00 30.00 313216 BKT 2011 01 25 07 06 00 1657-99 G co CCGG 194.290 -999.990 ... V2 2011 03 02 09 31 00 -0.2020 100.3180 875.00 845.00 30.00 313211 BKT 2011 01 25 07 06 00 1658-99 G co CCGG 194.130 -999.990 ... V2 2011 03 02 09 47 00 -0.2020 100.3180 875.00 845.00 30.00 313212 BKT 2011 02 01 07 00 00 6529-66 G co CCGG 144.260 -999.990 ... V2 2011 03 02 10 03 00 -0.2020 100.3180 875.00 845.00 30.00 313209 BKT 2011 02 01 07 00 00 6530-66 G co CCGG 144.370 -999.990 ... V2 2011 03 02 10 19 00 -0.2020 100.3180 875.00 845.00 30.00 313210 BKT 2011 02 08 07 00 00 711-99 G co CCGG 163.740 -999.990 ... V2 2011 03 17 13 22 00 -0.2020 100.3180 875.00 845.00 30.00 314337 BKT 2011 02 08 07 00 00 712-99 G co CCGG 164.940 -999.990 ... V2 2011 03 17 13 38 00 -0.2020 100.3180 875.00 845.00 30.00 314338 BKT 2011 02 15 07 00 00 571-99 G co CCGG 133.780 -999.990 -.. V2 2011 03 17 13 54 00 -0.2020 100.3180 875.00 845.00 30.00 314339 BKT 2011 02 15 07 00 00 572-99 G co CCGG 138.000 -999.990 +.. V2 2011 03 17 14 10 00 -0.2020 100.3180 875.00 845.00 30.00 314340 BKT 2011 02 22 07 00 00 945-99 G co CCGG 213.410 -999.990 ... V2 2011 03 17 15 00 00 -0.2020 100.3180 875.00 845.00 30.00 314343 BKT 2011 02 22 07 00 00 946-99 G co CCGG 213.090 -999.990 ... V2 2011 03 17 15 16 00 -0.2020 100.3180 875.00 845.00 30.00 314344 BKT 2011 03 01 07 05 00 3149-99 G co CCGG 5.800 -999.990 A.. V2 2011 03 17 14 27 00 -0.2020 100.3180 875.00 845.00 30.00 314341 BKT 2011 03 01 07 05 00 3150-99 G co CCGG 6.070 -999.990 A.. V2 2011 03 17 14 44 00 -0.2020 100.3180 875.00 845.00 30.00 314342 BKT 2013 02 05 06 40 00 6899-66 G co CCGG 162.520 -999.990 +.. V4 2013 05 07 10 35 00 -0.2020 100.3180 875.00 845.00 30.00 350995 BKT 2013 02 05 06 40 00 6900-66 G co CCGG 155.900 -999.990 -.. V4 2013 05 07 10 51 00 -0.2020 100.3180 875.00 845.00 30.00 350996 BKT 2013 02 12 07 00 00 15 G co CCGG 124.640 -999.990 ... V4 2013 05 10 11 58 00 -0.2020 100.3180 875.00 845.00 30.00 351019 BKT 2013 02 12 07 00 00 16 G co CCGG 124.870 -999.990 ... V4 2013 05 10 12 14 00 -0.2020 100.3180 875.00 845.00 30.00 351020 BKT 2013 02 19 07 00 00 2311-99 G co CCGG 119.190 -999.990 ... V4 2013 05 07 12 11 00 -0.2020 100.3180 875.00 845.00 30.00 351007 BKT 2013 02 19 07 00 00 2312-99 G co CCGG 118.420 -999.990 ... V4 2013 05 07 12 27 00 -0.2020 100.3180 875.00 845.00 30.00 351008 BKT 2013 02 26 07 00 00 777-99 G co CCGG 194.230 -999.990 ... V4 2013 05 08 11 51 00 -0.2020 100.3180 875.00 845.00 30.00 351001 BKT 2013 02 26 07 00 00 778-99 G co CCGG 194.340 -999.990 ... V4 2013 05 08 12 07 00 -0.2020 100.3180 875.00 845.00 30.00 351002 BKT 2013 03 02 07 00 00 3515-99 G co CCGG 151.460 -999.990 ... V4 2013 05 07 11 39 00 -0.2020 100.3180 875.00 845.00 30.00 351009 BKT 2013 03 02 07 00 00 3516-99 G co CCGG 151.750 -999.990 ... V4 2013 05 07 11 55 00 -0.2020 100.3180 875.00 845.00 30.00 351010 BKT 2013 03 05 07 00 00 4857-99 G co CCGG 182.370 -999.990 ... V4 2013 05 08 11 19 00 -0.2020 100.3180 875.00 845.00 30.00 350999 BKT 2013 03 05 07 00 00 4858-99 G co CCGG 182.900 -999.990 ... V4 2013 05 08 11 35 00 -0.2020 100.3180 875.00 845.00 30.00 351000 BKT 2013 03 12 07 00 00 1243-99 G co CCGG 177.540 -999.990 ... V4 2013 05 08 10 47 00 -0.2020 100.3180 875.00 845.00 30.00 350997 BKT 2013 03 12 07 00 00 1244-99 G co CCGG 178.050 -999.990 ... V4 2013 05 08 11 03 00 -0.2020 100.3180 875.00 845.00 30.00 350998 BKT 2013 03 19 07 00 00 3485-99 G co CCGG 194.150 -999.990 ... V4 2013 05 07 14 51 00 -0.2020 100.3180 875.00 845.00 30.00 351003 BKT 2013 03 19 07 00 00 3486-99 G co CCGG 194.590 -999.990 ... V4 2013 05 07 15 07 00 -0.2020 100.3180 875.00 845.00 30.00 351004 BKT 2013 03 26 07 09 00 711-99 G co CCGG 154.030 -999.990 ... V4 2013 05 07 11 07 00 -0.2020 100.3180 875.00 845.00 30.00 351005 BKT 2013 03 26 07 09 00 712-99 G co CCGG 154.630 -999.990 ... V4 2013 05 07 11 23 00 -0.2020 100.3180 875.00 845.00 30.00 351006 BKT 2013 05 14 07 00 00 2013-99 G co CCGG 88.120 -999.990 ... V2 2013 07 01 12 01 00 -0.2020 100.3180 875.00 845.00 30.00 353785 BKT 2013 05 14 07 00 00 2014-99 G co CCGG 90.720 -999.990 ... V2 2013 07 01 12 17 00 -0.2020 100.3180 875.00 845.00 30.00 353786 BKT 2013 05 21 07 00 00 1083-99 G co CCGG 157.390 -999.990 +.. V2 2013 07 01 12 34 00 -0.2020 100.3180 875.00 845.00 30.00 353787 BKT 2013 05 21 07 00 00 1084-99 G co CCGG 151.820 -999.990 -.. V2 2013 07 01 12 50 00 -0.2020 100.3180 875.00 845.00 30.00 353788 BKT 2013 05 28 07 00 00 3393-99 G co CCGG 76.030 -999.990 ... V2 2013 07 01 10 56 00 -0.2020 100.3180 875.00 845.00 30.00 353783 BKT 2013 05 28 07 00 00 3394-99 G co CCGG 76.000 -999.990 ... V2 2013 07 01 11 13 00 -0.2020 100.3180 875.00 845.00 30.00 353784 BKT 2013 06 04 07 00 00 1843-99 G co CCGG 81.630 -999.990 -.. V2 2013 07 01 11 29 00 -0.2020 100.3180 875.00 845.00 30.00 353781 BKT 2013 06 04 07 00 00 1844-99 G co CCGG 85.830 -999.990 +.. V2 2013 07 01 11 45 00 -0.2020 100.3180 875.00 845.00 30.00 353782 BKT 2013 06 11 07 00 00 3957-99 G co CCGG 65.260 -999.990 ... V4 2013 08 23 11 57 00 -0.2020 100.3180 875.00 845.00 30.00 356384 BKT 2013 06 11 07 00 00 3958-99 G co CCGG 140.860 -999.990 A.. V4 2013 08 23 12 13 00 -0.2020 100.3180 875.00 845.00 30.00 356385 BKT 2013 06 11 07 00 00 3958-99 G co CCGG 65.870 -999.990 ... V4 2013 08 23 12 29 00 -0.2020 100.3180 875.00 845.00 30.00 356385 BKT 2013 06 18 07 15 00 487-99 G co CCGG 73.430 -999.990 ... V4 2013 08 23 12 45 00 -0.2020 100.3180 875.00 845.00 30.00 356382 BKT 2013 06 18 07 15 00 488-99 G co CCGG 72.970 -999.990 ... V4 2013 08 23 13 01 00 -0.2020 100.3180 875.00 845.00 30.00 356383 BKT 2013 06 25 07 02 00 4065-99 G co CCGG 114.340 -999.990 ... V4 2013 08 23 11 25 00 -0.2020 100.3180 875.00 845.00 30.00 356380 BKT 2013 06 25 07 02 00 4066-99 G co CCGG 115.110 -999.990 ... V4 2013 08 23 11 41 00 -0.2020 100.3180 875.00 845.00 30.00 356381 BKT 2013 07 02 07 28 00 1959-99 G co CCGG 91.720 -999.990 ... V4 2013 08 23 10 53 00 -0.2020 100.3180 875.00 845.00 30.00 356378 BKT 2013 07 02 07 28 00 1960-99 G co CCGG 91.470 -999.990 ... V4 2013 08 23 11 09 00 -0.2020 100.3180 875.00 845.00 30.00 356379 BKT 2013 07 09 07 09 00 5165-99 G co CCGG 76.860 -999.990 ... V3 2013 09 23 13 35 00 -0.2020 100.3180 875.00 845.00 30.00 356963 BKT 2013 07 09 07 09 00 5166-99 G co CCGG 76.810 -999.990 ... V3 2013 09 23 13 51 00 -0.2020 100.3180 875.00 845.00 30.00 356964 BKT 2013 07 16 07 01 00 301-99 G co CCGG 90.670 -999.990 ... V3 2013 09 23 13 03 00 -0.2020 100.3180 875.00 845.00 30.00 356965 BKT 2013 07 16 07 01 00 302-99 G co CCGG 90.360 -999.990 ... V3 2013 09 23 13 19 00 -0.2020 100.3180 875.00 845.00 30.00 356966 BKT 2013 07 22 07 00 00 901-99 G co CCGG 122.380 -999.990 ... V3 2013 09 23 16 19 00 -0.2020 100.3180 875.00 845.00 30.00 356969 BKT 2013 07 22 07 00 00 902-99 G co CCGG 122.310 -999.990 ... V3 2013 09 23 16 35 00 -0.2020 100.3180 875.00 845.00 30.00 356970 BKT 2013 07 30 07 00 00 4311-99 G co CCGG 95.140 -999.990 ... V3 2013 09 23 14 08 00 -0.2020 100.3180 875.00 845.00 30.00 356967 BKT 2013 07 30 07 00 00 4312-99 G co CCGG 94.890 -999.990 ... V3 2013 09 23 14 24 00 -0.2020 100.3180 875.00 845.00 30.00 356968 BKT 2013 08 06 07 00 00 3921-99 G co CCGG 90.440 -999.990 ... V4 2013 10 17 12 55 00 -0.2020 100.3180 875.00 845.00 30.00 357382 BKT 2013 08 06 07 00 00 3922-99 G co CCGG 88.700 -999.990 ... V4 2013 10 17 13 11 00 -0.2020 100.3180 875.00 845.00 30.00 357383 BKT 2013 08 13 07 00 00 5237-99 G co CCGG 87.190 -999.990 ... V4 2013 09 30 12 33 00 -0.2020 100.3180 875.00 845.00 30.00 357384 BKT 2013 08 13 07 00 00 5238-99 G co CCGG 86.990 -999.990 ... V4 2013 09 30 12 49 00 -0.2020 100.3180 875.00 845.00 30.00 357385 BKT 2013 08 20 07 00 00 5079-99 G co CCGG 134.970 -999.990 ... V4 2013 09 30 13 37 00 -0.2020 100.3180 875.00 845.00 30.00 357388 BKT 2013 08 20 07 00 00 5080-99 G co CCGG 134.640 -999.990 ... V4 2013 09 30 13 53 00 -0.2020 100.3180 875.00 845.00 30.00 357389 BKT 2013 08 27 07 00 00 685-99 G co CCGG 237.180 -999.990 .X. V4 2013 09 30 13 05 00 -0.2020 100.3180 875.00 845.00 30.00 357386 BKT 2013 08 27 07 00 00 686-99 G co CCGG 236.830 -999.990 .X. V4 2013 09 30 13 21 00 -0.2020 100.3180 875.00 845.00 30.00 357387 BKT 2013 09 03 07 00 00 3723-99 G co CCGG 140.470 -999.990 ... V4 2013 11 13 13 24 00 -0.2020 100.3180 875.00 845.00 30.00 359404 BKT 2013 09 03 07 00 00 3724-99 G co CCGG 139.720 -999.990 ... V4 2013 11 13 13 40 00 -0.2020 100.3180 875.00 845.00 30.00 359405 BKT 2013 09 10 07 00 00 5055-99 G co CCGG 80.260 -999.990 ... V4 2013 11 13 12 52 00 -0.2020 100.3180 875.00 845.00 30.00 359407 BKT 2013 09 10 07 00 00 5056-99 G co CCGG 80.150 -999.990 ... V4 2013 11 13 13 08 00 -0.2020 100.3180 875.00 845.00 30.00 359406 BKT 2013 09 17 07 00 00 4987-99 G co CCGG 114.980 -999.990 ... V4 2013 11 06 15 54 00 -0.2020 100.3180 875.00 845.00 30.00 359360 BKT 2013 09 17 07 00 00 4988-99 G co CCGG 114.370 -999.990 ... V4 2013 11 06 16 10 00 -0.2020 100.3180 875.00 845.00 30.00 359361 BKT 2013 09 24 07 00 00 833-99 G co CCGG 115.440 -999.990 ... V4 2013 11 06 15 22 00 -0.2020 100.3180 875.00 845.00 30.00 359362 BKT 2013 09 24 07 00 00 834-99 G co CCGG 114.260 -999.990 ... V4 2013 11 06 15 38 00 -0.2020 100.3180 875.00 845.00 30.00 359363 BKT 2013 10 01 07 00 00 2203-99 G co CCGG 100.930 -999.990 +.. V4 2014 01 14 12 49 00 -0.2020 100.3180 875.00 845.00 30.00 362440 BKT 2013 10 01 07 00 00 2204-99 G co CCGG 97.730 -999.990 -.. V4 2014 01 14 13 05 00 -0.2020 100.3180 875.00 845.00 30.00 362441 BKT 2013 10 08 07 00 00 3301-99 G co CCGG 82.850 -999.990 ... V4 2014 01 14 12 17 00 -0.2020 100.3180 875.00 845.00 30.00 362442 BKT 2013 10 08 07 00 00 3302-99 G co CCGG 83.110 -999.990 ... V4 2014 01 14 12 33 00 -0.2020 100.3180 875.00 845.00 30.00 362443 BKT 2013 10 15 07 00 00 3093-99 G co CCGG 87.860 -999.990 ... V4 2014 01 16 15 42 00 -0.2020 100.3180 875.00 845.00 30.00 362434 BKT 2013 10 15 07 00 00 838-99 G co CCGG 87.410 -999.990 ... V4 2014 01 16 15 58 00 -0.2020 100.3180 875.00 845.00 30.00 362435 BKT 2013 10 22 07 06 00 125-99 G co CCGG 97.260 -999.990 ... V4 2014 01 17 11 42 00 -0.2020 100.3180 875.00 845.00 30.00 362432 BKT 2013 10 22 07 06 00 126-99 G co CCGG 96.570 -999.990 ... V4 2014 01 17 11 58 00 -0.2020 100.3180 875.00 845.00 30.00 362433 BKT 2013 10 29 07 05 00 3187-99 G co CCGG 134.760 -999.990 ... V4 2014 01 14 09 37 00 -0.2020 100.3180 875.00 845.00 30.00 362444 BKT 2013 10 29 07 05 00 3188-99 G co CCGG 133.130 -999.990 ... V4 2014 01 14 09 53 00 -0.2020 100.3180 875.00 845.00 30.00 362445 BKT 2013 11 05 07 00 00 2955-99 G co CCGG 159.740 -999.990 ... V4 2014 01 10 12 26 00 -0.2020 100.3180 875.00 845.00 30.00 362446 BKT 2013 11 05 07 00 00 2956-99 G co CCGG 159.270 -999.990 ... V4 2014 01 10 12 42 00 -0.2020 100.3180 875.00 845.00 30.00 362447 BKT 2013 11 12 07 20 00 1403-99 G co CCGG 129.280 -999.990 ... V4 2014 01 16 11 25 00 -0.2020 100.3180 875.00 845.00 30.00 362478 BKT 2013 11 12 07 20 00 1404-99 G co CCGG 128.450 -999.990 ... V4 2014 01 16 11 41 00 -0.2020 100.3180 875.00 845.00 30.00 362479 BKT 2013 11 19 07 00 00 1593-99 G co CCGG 123.520 -999.990 ... V4 2014 01 16 10 53 00 -0.2020 100.3180 875.00 845.00 30.00 362476 BKT 2013 11 19 07 00 00 1616-99 G co CCGG 123.280 -999.990 ... V4 2014 01 16 11 09 00 -0.2020 100.3180 875.00 845.00 30.00 362477 BKT 2013 11 26 07 02 00 303-99 G co CCGG 96.780 -999.990 ... V4 2014 01 14 11 45 00 -0.2020 100.3180 875.00 845.00 30.00 362438 BKT 2013 11 26 07 02 00 576-99 G co CCGG 96.370 -999.990 ... V4 2014 01 14 12 01 00 -0.2020 100.3180 875.00 845.00 30.00 362439 BKT 2013 12 03 07 00 00 1294-99 G co CCGG 81.960 -999.990 ... V4 2014 01 14 11 29 00 -0.2020 100.3180 875.00 845.00 30.00 362437 BKT 2013 12 03 07 00 00 3549-99 G co CCGG 83.000 -999.990 ... V4 2014 01 14 11 13 00 -0.2020 100.3180 875.00 845.00 30.00 362436 BKT 2013 12 10 07 00 00 232-99 G co CCGG 102.000 -999.990 ... V4 2014 01 16 10 36 00 -0.2020 100.3180 875.00 845.00 30.00 362473 BKT 2013 12 10 07 00 00 413-99 G co CCGG 102.320 -999.990 ... V4 2014 01 16 10 20 00 -0.2020 100.3180 875.00 845.00 30.00 362472 BKT 2013 12 17 07 00 00 2568-99 G co CCGG 87.210 -999.990 ... V4 2014 01 16 12 13 00 -0.2020 100.3180 875.00 845.00 30.00 362475 BKT 2013 12 17 07 00 00 6187-66 G co CCGG 86.800 -999.990 ... V4 2014 01 16 11 57 00 -0.2020 100.3180 875.00 845.00 30.00 362474 BKT 2013 12 24 07 08 00 533-99 G co CCGG 106.300 -999.990 ... V4 2014 04 10 17 30 00 -0.2020 100.3180 875.00 845.00 30.00 366343 BKT 2013 12 24 07 08 00 534-99 G co CCGG 107.250 -999.990 ... V4 2014 04 10 17 46 00 -0.2020 100.3180 875.00 845.00 30.00 366344 BKT 2013 12 31 07 12 00 2055-99 G co CCGG 192.070 -999.990 ... V4 2014 04 10 16 58 00 -0.2020 100.3180 875.00 845.00 30.00 366341 BKT 2013 12 31 07 12 00 2056-99 G co CCGG 190.790 -999.990 ... V4 2014 04 10 17 14 00 -0.2020 100.3180 875.00 845.00 30.00 366342 BKT 2014 01 07 07 00 00 1554-99 G co CCGG 122.100 -999.990 ... V4 2014 04 14 12 10 00 -0.2020 100.3180 875.00 845.00 30.00 366366 BKT 2014 01 07 07 00 00 3937-99 G co CCGG 122.980 -999.990 ... V4 2014 04 14 11 54 00 -0.2020 100.3180 875.00 845.00 30.00 366367 BKT 2014 01 14 07 00 00 3056-99 G co CCGG 159.560 -999.990 ... V4 2014 04 14 12 29 00 -0.2020 100.3180 875.00 845.00 30.00 366365 BKT 2014 01 21 07 00 00 2944-99 G co CCGG 208.570 -999.990 ... V4 2014 04 10 16 41 00 -0.2020 100.3180 875.00 845.00 30.00 366338 BKT 2014 01 21 07 00 00 3961-99 G co CCGG 208.390 -999.990 ... V4 2014 04 10 16 25 00 -0.2020 100.3180 875.00 845.00 30.00 366337 BKT 2014 01 28 07 00 00 3005-99 G co CCGG 270.760 -999.990 .X. V4 2014 04 10 15 53 00 -0.2020 100.3180 875.00 845.00 30.00 366339 BKT 2014 01 28 07 00 00 4158-99 G co CCGG 270.030 -999.990 .X. V4 2014 04 10 16 09 00 -0.2020 100.3180 875.00 845.00 30.00 366340 BKT 2014 02 04 07 00 00 3374-99 G co CCGG 150.360 -999.990 ... V4 2014 04 14 11 38 00 -0.2020 100.3180 875.00 845.00 30.00 366364 BKT 2014 02 04 07 00 00 4383-99 G co CCGG 156.690 -999.990 N.. V4 2014 04 14 11 22 00 -0.2020 100.3180 875.00 845.00 30.00 366363 BKT 2014 02 11 07 00 00 1692-99 G co CCGG 186.680 -999.990 +.. V4 2014 04 14 11 06 00 -0.2020 100.3180 875.00 845.00 30.00 366361 BKT 2014 02 11 07 00 00 3745-99 G co CCGG 181.470 -999.990 -.. V4 2014 04 14 10 50 00 -0.2020 100.3180 875.00 845.00 30.00 366362 BKT 2014 02 18 07 00 00 2296-99 G co CCGG 746.040 -999.990 .XC V4 2014 05 09 13 45 00 -0.2020 100.3180 875.00 845.00 30.00 367095 BKT 2014 02 25 07 00 00 170-99 G co CCGG 1684.810 -999.990 .XC V4 2014 04 28 15 57 00 -0.2020 100.3180 875.00 845.00 30.00 367092 BKT 2014 02 25 07 00 00 3746-99 G co CCGG 1687.970 -999.990 .XC V4 2014 04 28 15 41 00 -0.2020 100.3180 875.00 845.00 30.00 367091 BKT 2014 03 04 07 00 00 1669-99 G co CCGG 1245.570 -999.990 -.. V4 2014 04 29 13 59 00 -0.2020 100.3180 875.00 845.00 30.00 367106 BKT 2014 03 04 07 00 00 1760-99 G co CCGG 1282.300 -999.990 +.. V4 2014 04 29 14 15 00 -0.2020 100.3180 875.00 845.00 30.00 367107 BKT 2014 03 11 07 00 00 3894-99 G co CCGG 2211.070 -999.990 -.. V4 2014 04 29 13 43 00 -0.2020 100.3180 875.00 845.00 30.00 367100 BKT 2014 03 11 07 00 00 501-99 G co CCGG 2222.920 -999.990 +.. V4 2014 04 29 13 27 00 -0.2020 100.3180 875.00 845.00 30.00 367101 BKT 2014 03 18 07 00 00 621-99 G co CCGG 154.530 -999.990 ... V4 2014 04 28 15 09 00 -0.2020 100.3180 875.00 845.00 30.00 367096 BKT 2014 03 18 07 00 00 769-99 G co CCGG 154.900 -999.990 ... V4 2014 04 28 15 25 00 -0.2020 100.3180 875.00 845.00 30.00 367097 BKT 2014 03 25 07 06 00 285-99 G co CCGG 338.050 -999.990 .X. V4 2014 04 28 16 13 00 -0.2020 100.3180 875.00 845.00 30.00 367093 BKT 2014 03 25 07 06 00 5308-99 G co CCGG 337.280 -999.990 .X. V4 2014 04 28 16 29 00 -0.2020 100.3180 875.00 845.00 30.00 367094 BKT 2014 04 29 07 00 00 1765-99 G co CCGG 84.760 -999.990 ... V4 2014 08 07 14 28 00 -0.2020 100.3180 875.00 845.00 30.00 371536 BKT 2014 04 29 07 00 00 3128-99 G co CCGG 86.420 -999.990 ... V4 2014 08 07 14 44 00 -0.2020 100.3180 875.00 845.00 30.00 371537 BKT 2014 05 06 07 00 00 3387-99 G co CCGG 128.840 -999.990 ... V4 2014 08 07 14 12 00 -0.2020 100.3180 875.00 845.00 30.00 371541 BKT 2014 05 06 07 00 00 377-99 G co CCGG 129.640 -999.990 ... V4 2014 08 07 13 56 00 -0.2020 100.3180 875.00 845.00 30.00 371540 BKT 2014 05 13 07 00 00 3245-99 G co CCGG 104.300 -999.990 ... V4 2014 08 08 14 01 00 -0.2020 100.3180 875.00 845.00 30.00 371494 BKT 2014 05 13 07 00 00 5120-99 G co CCGG 104.700 -999.990 ... V4 2014 08 08 14 17 00 -0.2020 100.3180 875.00 845.00 30.00 371495 BKT 2014 05 20 07 00 00 6098-66 G co CCGG 110.900 -999.990 ... V4 2014 08 08 14 49 00 -0.2020 100.3180 875.00 845.00 30.00 371493 BKT 2014 05 20 07 00 00 893-99 G co CCGG 111.080 -999.990 ... V4 2014 08 08 14 33 00 -0.2020 100.3180 875.00 845.00 30.00 371492 BKT 2014 05 27 07 00 00 2680-99 G co CCGG 102.480 -999.990 ... V4 2014 08 07 15 16 00 -0.2020 100.3180 875.00 845.00 30.00 371543 BKT 2014 05 27 07 00 00 4707-99 G co CCGG 103.470 -999.990 ... V4 2014 08 07 15 00 00 -0.2020 100.3180 875.00 845.00 30.00 371542 BKT 2014 06 03 07 00 00 1104-99 G co CCGG 154.590 -999.990 ... V4 2014 08 07 15 48 00 -0.2020 100.3180 875.00 845.00 30.00 371539 BKT 2014 06 03 07 00 00 1156-99 G co CCGG 155.150 -999.990 ... V4 2014 08 07 15 32 00 -0.2020 100.3180 875.00 845.00 30.00 371538 BKT 2014 06 10 07 00 00 565-99 G co CCGG 85.770 -999.990 ... V4 2014 08 08 15 05 00 -0.2020 100.3180 875.00 845.00 30.00 371496 BKT 2014 06 10 07 00 00 566-99 G co CCGG 85.570 -999.990 ... V4 2014 08 08 15 21 00 -0.2020 100.3180 875.00 845.00 30.00 371497 BKT 2014 06 17 07 00 00 5183-99 G co CCGG 84.070 -999.990 ... V4 2014 08 06 13 31 00 -0.2020 100.3180 875.00 845.00 30.00 371512 BKT 2014 06 17 07 00 00 5184-99 G co CCGG 82.190 -999.990 ... V4 2014 08 06 13 47 00 -0.2020 100.3180 875.00 845.00 30.00 371513 BKT 2014 06 24 07 00 00 165-99 G co CCGG 71.870 -999.990 ... V4 2014 08 06 15 07 00 -0.2020 100.3180 875.00 845.00 30.00 371518 BKT 2014 06 24 07 00 00 166-99 G co CCGG 73.030 -999.990 ... V4 2014 08 06 15 23 00 -0.2020 100.3180 875.00 845.00 30.00 371519 BKT 2014 07 01 07 00 00 2119-99 G co CCGG 120.460 -999.990 ... V4 2014 08 07 11 46 00 -0.2020 100.3180 875.00 845.00 30.00 371520 BKT 2014 07 01 07 00 00 2120-99 G co CCGG 120.480 -999.990 ... V4 2014 08 07 12 02 00 -0.2020 100.3180 875.00 845.00 30.00 371521 BKT 2014 07 08 07 00 00 3444-99 G co CCGG 69.130 -999.990 ... V4 2014 08 06 14 19 00 -0.2020 100.3180 875.00 845.00 30.00 371517 BKT 2014 07 08 07 00 00 3699-99 G co CCGG 67.820 -999.990 ... V4 2014 08 06 14 03 00 -0.2020 100.3180 875.00 845.00 30.00 371516 BKT 2014 07 15 07 00 00 168-99 G co CCGG 76.490 -999.990 ... V4 2014 08 06 14 35 00 -0.2020 100.3180 875.00 845.00 30.00 371514 BKT 2014 07 15 07 00 00 3366-99 G co CCGG 76.440 -999.990 ... V4 2014 08 06 14 51 00 -0.2020 100.3180 875.00 845.00 30.00 371515 BKT 2014 07 22 07 00 00 983-99 G co CCGG 135.450 -999.990 ... V4 2014 12 18 16 47 00 -0.2020 100.3180 875.00 845.00 30.00 378771 BKT 2014 07 22 07 00 00 984-99 G co CCGG 133.450 -999.990 ... V4 2014 12 18 17 03 00 -0.2020 100.3180 875.00 845.00 30.00 378772 BKT 2014 07 29 07 00 00 957-99 G co CCGG 92.110 -999.990 ... V4 2014 12 18 16 15 00 -0.2020 100.3180 875.00 845.00 30.00 378773 BKT 2014 07 29 07 00 00 958-99 G co CCGG 92.490 -999.990 ... V4 2014 12 18 16 31 00 -0.2020 100.3180 875.00 845.00 30.00 378774 BKT 2014 08 05 07 00 00 2443-99 G co CCGG 82.780 -999.990 ... V4 2014 12 19 10 22 00 -0.2020 100.3180 875.00 845.00 30.00 378747 BKT 2014 08 05 07 00 00 2444-99 G co CCGG 82.410 -999.990 ... V4 2014 12 19 10 38 00 -0.2020 100.3180 875.00 845.00 30.00 378748 BKT 2014 08 12 07 00 00 4769-99 G co CCGG 121.290 -999.990 ... V4 2014 12 19 10 54 00 -0.2020 100.3180 875.00 845.00 30.00 378749 BKT 2014 08 12 07 00 00 738-99 G co CCGG 120.710 -999.990 ... V4 2014 12 19 11 10 00 -0.2020 100.3180 875.00 845.00 30.00 378750 BKT 2014 08 19 07 00 00 174-99 G co CCGG 104.960 -999.990 ... V4 2014 12 18 11 41 00 -0.2020 100.3180 875.00 845.00 30.00 378778 BKT 2014 08 19 07 00 00 2625-99 G co CCGG 106.670 -999.990 ... V4 2014 12 18 11 25 00 -0.2020 100.3180 875.00 845.00 30.00 378777 BKT 2014 08 26 07 00 00 2918-99 G co CCGG 97.770 -999.990 +.. V4 2014 12 18 10 53 00 -0.2020 100.3180 875.00 845.00 30.00 378775 BKT 2014 08 26 07 00 00 5194-99 G co CCGG 94.950 -999.990 -.. V4 2014 12 18 11 09 00 -0.2020 100.3180 875.00 845.00 30.00 378776 BKT 2014 09 02 07 00 00 4510-99 G co CCGG 92.100 -999.990 ... V4 2014 12 18 12 30 00 -0.2020 100.3180 875.00 845.00 30.00 378779 BKT 2014 09 02 07 00 00 5318-99 G co CCGG 91.350 -999.990 ... V4 2014 12 18 12 46 00 -0.2020 100.3180 875.00 845.00 30.00 378780 BKT 2014 09 09 07 00 00 2440-99 G co CCGG 136.460 -999.990 ... V4 2014 12 18 12 13 00 -0.2020 100.3180 875.00 845.00 30.00 378782 BKT 2014 09 09 07 00 00 2957-99 G co CCGG 136.230 -999.990 ... V4 2014 12 18 11 57 00 -0.2020 100.3180 875.00 845.00 30.00 378781 BKT 2014 09 16 07 00 00 2891-99 G co CCGG 560.620 -999.990 +.. V4 2014 12 16 10 41 00 -0.2020 100.3180 875.00 845.00 30.00 378410 BKT 2014 09 16 07 00 00 3312-99 G co CCGG 555.900 -999.990 -.. V4 2014 12 16 10 57 00 -0.2020 100.3180 875.00 845.00 30.00 378411 BKT 2014 09 23 07 00 00 3622-99 G co CCGG 593.400 -999.990 +.. V4 2014 12 16 10 25 00 -0.2020 100.3180 875.00 845.00 30.00 378409 BKT 2014 09 23 07 00 00 4673-99 G co CCGG 588.980 -999.990 -.. V4 2014 12 16 10 09 00 -0.2020 100.3180 875.00 845.00 30.00 378408 BKT 2014 09 30 07 00 00 1231-99 G co CCGG 287.790 -999.990 .X. V4 2014 12 16 13 56 00 -0.2020 100.3180 875.00 845.00 30.00 378396 BKT 2014 09 30 07 00 00 1232-99 G co CCGG 287.570 -999.990 .X. V4 2014 12 16 14 12 00 -0.2020 100.3180 875.00 845.00 30.00 378397 BKT 2014 10 07 07 00 00 1443-99 G co CCGG 113.850 -999.990 ... V4 2014 12 16 14 28 00 -0.2020 100.3180 875.00 845.00 30.00 378398 BKT 2014 10 07 07 00 00 1444-99 G co CCGG 113.670 -999.990 ... V4 2014 12 16 14 44 00 -0.2020 100.3180 875.00 845.00 30.00 378399 BKT 2014 10 14 07 00 00 4515-99 G co CCGG 659.050 -999.990 .N. V4 2014 12 16 15 32 00 -0.2020 100.3180 875.00 845.00 30.00 378402 BKT 2014 10 14 07 00 00 4516-99 G co CCGG 659.280 -999.990 .N. V4 2014 12 16 15 48 00 -0.2020 100.3180 875.00 845.00 30.00 378403 BKT 2014 10 21 08 17 00 3355-99 G co CCGG 773.870 -999.990 -.. V4 2014 12 16 15 00 00 -0.2020 100.3180 875.00 845.00 30.00 378400 BKT 2014 10 21 08 17 00 3356-99 G co CCGG 777.450 -999.990 +.. V4 2014 12 16 15 16 00 -0.2020 100.3180 875.00 845.00 30.00 378401 BKT 2014 10 28 07 00 00 4927-99 G co CCGG 198.430 -999.990 ... V4 2014 12 18 15 10 00 -0.2020 100.3180 875.00 845.00 30.00 378767 BKT 2014 10 28 07 00 00 71-99 G co CCGG 199.450 -999.990 ... V4 2014 12 18 15 26 00 -0.2020 100.3180 875.00 845.00 30.00 378768 BKT 2014 11 04 07 00 00 2543-99 G co CCGG 711.740 -999.990 .N. V4 2014 12 18 15 43 00 -0.2020 100.3180 875.00 845.00 30.00 378769 BKT 2014 11 04 07 00 00 4359-99 G co CCGG 713.260 -999.990 .N. V4 2014 12 18 15 59 00 -0.2020 100.3180 875.00 845.00 30.00 378770 BKT 2014 11 11 07 00 00 3114-99 G co CCGG 166.200 -999.990 ... V4 2014 12 19 10 06 00 -0.2020 100.3180 875.00 845.00 30.00 378746 BKT 2014 11 11 07 00 00 5345-99 G co CCGG 165.070 -999.990 ... V4 2014 12 19 09 49 00 -0.2020 100.3180 875.00 845.00 30.00 378745 BKT 2014 11 18 07 00 00 3995-99 G co CCGG 124.930 -999.990 ... V4 2014 12 18 17 19 00 -0.2020 100.3180 875.00 845.00 30.00 378743 BKT 2014 11 18 07 00 00 4873-99 G co CCGG 125.120 -999.990 ... V4 2014 12 18 17 35 00 -0.2020 100.3180 875.00 845.00 30.00 378744 BKT 2015 01 06 07 02 00 2935-99 G co CCGG 119.060 -999.990 ... V4 2015 04 23 10 30 00 -0.2020 100.3180 875.00 845.00 30.00 384916 BKT 2015 01 06 07 02 00 2936-99 G co CCGG 118.330 -999.990 ... V4 2015 04 23 10 45 00 -0.2020 100.3180 875.00 845.00 30.00 384917 BKT 2015 01 13 07 00 00 3783-99 G co CCGG 161.190 -999.990 ... V4 2015 04 23 11 01 00 -0.2020 100.3180 875.00 845.00 30.00 384914 BKT 2015 01 13 07 00 00 3784-99 G co CCGG 160.490 -999.990 ... V4 2015 04 23 11 17 00 -0.2020 100.3180 875.00 845.00 30.00 384915 BKT 2015 01 20 07 00 00 5403-99 G co CCGG 250.490 -999.990 ... V4 2015 04 24 11 21 00 -0.2020 100.3180 875.00 845.00 30.00 384870 BKT 2015 01 20 07 00 00 5404-99 G co CCGG 250.450 -999.990 ... V4 2015 04 24 11 36 00 -0.2020 100.3180 875.00 845.00 30.00 384871 BKT 2015 01 27 07 00 00 3625-99 G co CCGG 219.070 -999.990 ... V4 2015 04 24 11 52 00 -0.2020 100.3180 875.00 845.00 30.00 384872 BKT 2015 01 27 07 00 00 3626-99 G co CCGG 217.780 -999.990 ... V4 2015 04 24 12 08 00 -0.2020 100.3180 875.00 845.00 30.00 384873 BKT 2015 02 03 07 00 00 4417-99 G co CCGG 161.910 -999.990 ... V4 2015 04 24 17 10 00 -0.2020 100.3180 875.00 845.00 30.00 384892 BKT 2015 02 03 07 00 00 4418-99 G co CCGG 162.930 -999.990 ... V4 2015 04 24 17 25 00 -0.2020 100.3180 875.00 845.00 30.00 384893 BKT 2015 02 10 07 00 00 1623-99 G co CCGG 206.010 -999.990 ... V4 2015 04 24 16 38 00 -0.2020 100.3180 875.00 845.00 30.00 384890 BKT 2015 02 10 07 00 00 1624-99 G co CCGG 205.170 -999.990 ... V4 2015 04 24 16 54 00 -0.2020 100.3180 875.00 845.00 30.00 384891 BKT 2015 02 17 07 00 00 3471-99 G co CCGG 248.930 -999.990 ... V4 2015 04 24 15 34 00 -0.2020 100.3180 875.00 845.00 30.00 384888 BKT 2015 02 17 07 00 00 3472-99 G co CCGG 248.150 -999.990 ... V4 2015 04 24 15 50 00 -0.2020 100.3180 875.00 845.00 30.00 384889 BKT 2015 02 24 07 00 00 3691-99 G co CCGG 154.150 -999.990 ... V4 2015 04 24 16 06 00 -0.2020 100.3180 875.00 845.00 30.00 384886 BKT 2015 02 24 07 00 00 3692-99 G co CCGG 154.120 -999.990 ... V4 2015 04 24 16 22 00 -0.2020 100.3180 875.00 845.00 30.00 384887 BKT 2015 03 03 07 00 00 1494-99 G co CCGG 156.470 -999.990 ... V4 2015 04 23 10 14 00 -0.2020 100.3180 875.00 845.00 30.00 384910 BKT 2015 03 03 07 00 00 2967-99 G co CCGG 156.600 -999.990 ... V4 2015 04 23 09 58 00 -0.2020 100.3180 875.00 845.00 30.00 384911 BKT 2015 03 10 07 00 00 4589-99 G co CCGG 123.400 -999.990 ... V4 2015 04 23 09 26 00 -0.2020 100.3180 875.00 845.00 30.00 384912 BKT 2015 03 10 07 00 00 6187-66 G co CCGG 123.590 -999.990 ... V4 2015 04 23 09 42 00 -0.2020 100.3180 875.00 845.00 30.00 384913 BKT 2015 03 17 07 00 00 2983-99 G co CCGG 200.350 -999.990 ... V4 2015 04 24 12 24 00 -0.2020 100.3180 875.00 845.00 30.00 384874 BKT 2015 03 17 07 00 00 4199-99 G co CCGG 201.770 -999.990 ... V4 2015 04 24 12 40 00 -0.2020 100.3180 875.00 845.00 30.00 384875 BKT 2015 03 24 07 00 00 1081-99 G co CCGG 189.000 -999.990 ... V4 2015 04 24 13 12 00 -0.2020 100.3180 875.00 845.00 30.00 384876 BKT 2015 03 24 07 00 00 3833-99 G co CCGG 189.890 -999.990 ... V4 2015 04 24 12 56 00 -0.2020 100.3180 875.00 845.00 30.00 384877 BKT 2015 03 31 07 00 00 1357-99 G co CCGG 136.750 -999.990 ... V4 2015 06 18 15 21 00 -0.2020 100.3180 875.00 845.00 30.00 388011 BKT 2015 03 31 07 00 00 1358-99 G co CCGG 137.880 -999.990 ... V4 2015 06 18 15 37 00 -0.2020 100.3180 875.00 845.00 30.00 388012 BKT 2015 04 07 07 02 00 4771-99 G co CCGG 129.100 -999.990 ... V4 2015 06 18 14 49 00 -0.2020 100.3180 875.00 845.00 30.00 388013 BKT 2015 04 07 07 02 00 4772-99 G co CCGG 130.420 -999.990 ... V4 2015 06 18 15 05 00 -0.2020 100.3180 875.00 845.00 30.00 388014 BKT 2015 04 14 07 00 00 1185-99 G co CCGG 158.970 -999.990 ... V4 2015 06 16 09 22 00 -0.2020 100.3180 875.00 845.00 30.00 388107 BKT 2015 04 14 07 00 00 205-99 G co CCGG 158.430 -999.990 ... V4 2015 06 16 09 38 00 -0.2020 100.3180 875.00 845.00 30.00 388108 BKT 2015 04 21 07 00 00 3335-99 G co CCGG 104.600 -999.990 ... V4 2015 06 16 08 50 00 -0.2020 100.3180 875.00 845.00 30.00 388105 BKT 2015 04 21 07 00 00 4322-99 G co CCGG 104.500 -999.990 ... V4 2015 06 16 09 06 00 -0.2020 100.3180 875.00 845.00 30.00 388106 BKT 2015 04 28 07 00 00 1239-99 G co CCGG 110.820 -999.990 ... V4 2015 07 22 14 46 00 -0.2020 100.3180 875.00 845.00 30.00 390089 BKT 2015 04 28 07 00 00 4363-99 G co CCGG 109.960 -999.990 ... V4 2015 07 22 14 30 00 -0.2020 100.3180 875.00 845.00 30.00 390088 BKT 2015 05 05 07 00 00 3255-99 G co CCGG 93.020 -999.990 ... V4 2015 07 22 15 01 00 -0.2020 100.3180 875.00 845.00 30.00 390086 BKT 2015 05 05 07 00 00 3699-99 G co CCGG 93.810 -999.990 ... V4 2015 07 22 15 17 00 -0.2020 100.3180 875.00 845.00 30.00 390087 BKT 2015 05 12 07 00 00 2116-99 G co CCGG 141.950 -999.990 ... V4 2015 07 22 16 21 00 -0.2020 100.3180 875.00 845.00 30.00 390083 BKT 2015 05 12 07 00 00 4429-99 G co CCGG 141.800 -999.990 ... V4 2015 07 22 16 05 00 -0.2020 100.3180 875.00 845.00 30.00 390082 BKT 2015 05 19 07 00 00 765-99 G co CCGG 118.200 -999.990 ... V4 2015 07 22 15 33 00 -0.2020 100.3180 875.00 845.00 30.00 390084 BKT 2015 05 19 07 00 00 888-99 G co CCGG 119.000 -999.990 ... V4 2015 07 22 15 49 00 -0.2020 100.3180 875.00 845.00 30.00 390085 BKT 2015 05 26 07 00 00 3042-99 G co CCGG 101.490 -999.990 ... V4 2015 07 22 12 39 00 -0.2020 100.3180 875.00 845.00 30.00 390934 BKT 2015 05 26 07 00 00 964-99 G co CCGG 102.200 -999.990 ... V4 2015 07 22 12 23 00 -0.2020 100.3180 875.00 845.00 30.00 390933 BKT 2015 06 02 07 00 00 352-99 G co CCGG 142.960 -999.990 ... V4 2015 07 22 12 55 00 -0.2020 100.3180 875.00 845.00 30.00 390931 BKT 2015 06 02 07 00 00 956-99 G co CCGG 145.770 -999.990 ... V4 2015 07 22 13 11 00 -0.2020 100.3180 875.00 845.00 30.00 390932 BKT 2015 06 16 07 00 00 4209-99 G co CCGG 81.270 -999.990 ... V4 2015 07 22 14 14 00 -0.2020 100.3180 875.00 845.00 30.00 390922 BKT 2015 06 16 07 00 00 556-99 G co CCGG 82.610 -999.990 ... V4 2015 07 22 13 58 00 -0.2020 100.3180 875.00 845.00 30.00 390921 BKT 2015 06 23 07 00 00 1793-99 G co CCGG 124.910 -999.990 ... V4 2015 07 22 13 27 00 -0.2020 100.3180 875.00 845.00 30.00 390919 BKT 2015 06 23 07 00 00 4935-99 G co CCGG 126.210 -999.990 ... V4 2015 07 22 13 42 00 -0.2020 100.3180 875.00 845.00 30.00 390920 BKT 2015 06 30 07 00 00 1744-99 G co CCGG 121.690 -999.990 ... V4 2015 09 24 13 07 00 -0.2020 100.3180 875.00 845.00 30.00 394115 BKT 2015 07 07 07 00 00 3934-99 G co CCGG 117.260 -999.990 ... V4 2015 09 22 16 58 00 -0.2020 100.3180 875.00 845.00 30.00 394116 BKT 2015 07 07 07 00 00 4189-99 G co CCGG 116.990 -999.990 ... V4 2015 09 22 17 14 00 -0.2020 100.3180 875.00 845.00 30.00 394117 BKT 2015 07 14 07 00 00 5237-99 G co CCGG 68.950 -999.990 ... V4 2015 09 17 13 35 00 -0.2020 100.3180 875.00 845.00 30.00 393971 BKT 2015 07 14 07 00 00 5238-99 G co CCGG 69.620 -999.990 ... V4 2015 09 17 13 51 00 -0.2020 100.3180 875.00 845.00 30.00 393972 BKT 2015 07 21 07 00 00 4203-99 G co CCGG 81.460 -999.990 ... V4 2015 09 17 13 03 00 -0.2020 100.3180 875.00 845.00 30.00 393969 BKT 2015 07 21 07 00 00 4204-99 G co CCGG 81.740 -999.990 ... V4 2015 09 17 13 19 00 -0.2020 100.3180 875.00 845.00 30.00 393970 BKT 2015 07 28 07 00 00 1753-99 G co CCGG 213.180 -999.990 ... V4 2015 11 20 16 08 00 -0.2020 100.3180 875.00 845.00 30.00 397824 BKT 2015 07 28 07 00 00 3362-99 G co CCGG 211.710 -999.990 ... V4 2015 11 20 16 24 00 -0.2020 100.3180 875.00 845.00 30.00 397825 BKT 2015 08 04 07 00 00 1156-99 G co CCGG 100.590 -999.990 ... V4 2015 11 20 15 52 00 -0.2020 100.3180 875.00 845.00 30.00 397822 BKT 2015 08 04 07 00 00 1363-99 G co CCGG 98.820 -999.990 ... V4 2015 11 20 15 36 00 -0.2020 100.3180 875.00 845.00 30.00 397823 BKT 2015 08 11 07 00 00 3978-99 G co CCGG 165.950 -999.990 ... V4 2015 11 19 14 40 00 -0.2020 100.3180 875.00 845.00 30.00 397841 BKT 2015 08 11 07 00 00 6217-66 G co CCGG 166.870 -999.990 ... V4 2015 11 19 14 24 00 -0.2020 100.3180 875.00 845.00 30.00 397840 BKT 2015 08 16 03 48 00 1419-99 G co CCGG 272.370 -999.990 .X. V4 2015 11 19 14 56 00 -0.2020 100.3180 875.00 845.00 30.00 397838 BKT 2015 08 16 03 48 00 4317-99 G co CCGG 271.130 -999.990 .X. V4 2015 11 19 15 12 00 -0.2020 100.3180 875.00 845.00 30.00 397839 BKT 2015 08 25 07 00 00 3017-99 G co CCGG 265.190 -999.990 .X. V4 2015 11 19 15 27 00 -0.2020 100.3180 875.00 845.00 30.00 397842 BKT 2015 08 25 07 00 00 3018-99 G co CCGG 266.410 -999.990 .X. V4 2015 11 19 15 43 00 -0.2020 100.3180 875.00 845.00 30.00 397843 BKT 2015 09 01 07 00 00 4047-99 G co CCGG 999.600 -999.990 +.. V4 2015 11 19 15 59 00 -0.2020 100.3180 875.00 845.00 30.00 397844 BKT 2015 09 01 07 00 00 4048-99 G co CCGG 982.050 -999.990 -.. V4 2015 11 19 16 15 00 -0.2020 100.3180 875.00 845.00 30.00 397845 BKT 2015 09 08 07 00 00 5383-99 G co CCGG 575.720 -999.990 .N. V4 2015 11 20 14 33 00 -0.2020 100.3180 875.00 845.00 30.00 397834 BKT 2015 09 08 07 00 00 5384-99 G co CCGG 575.470 -999.990 .N. V4 2015 11 20 14 49 00 -0.2020 100.3180 875.00 845.00 30.00 397835 BKT 2015 09 15 07 00 00 3137-99 G co CCGG 253.430 -999.990 ... V4 2015 11 20 15 05 00 -0.2020 100.3180 875.00 845.00 30.00 397836 BKT 2015 09 15 07 00 00 3138-99 G co CCGG 253.510 -999.990 ... V4 2015 11 20 15 21 00 -0.2020 100.3180 875.00 845.00 30.00 397837 BKT 2015 09 22 07 00 00 322-99 G co CCGG 453.970 -999.990 .X. V4 2015 11 20 14 01 00 -0.2020 100.3180 875.00 845.00 30.00 397832 BKT 2015 09 22 07 00 00 4276-99 G co CCGG 452.420 -999.990 .X. V4 2015 11 20 14 17 00 -0.2020 100.3180 875.00 845.00 30.00 397833 BKT 2015 09 29 07 00 00 4471-99 G co CCGG 514.650 -999.990 N.. V4 2015 11 20 13 30 00 -0.2020 100.3180 875.00 845.00 30.00 397830 BKT 2015 09 29 07 00 00 4687-99 G co CCGG 530.920 -999.990 N.. V4 2015 11 20 13 46 00 -0.2020 100.3180 875.00 845.00 30.00 397831 BKT 2015 10 06 07 00 00 4785-99 G co CCGG 2820.600 -999.990 -.. V4 2015 11 23 11 30 00 -0.2020 100.3180 875.00 845.00 30.00 397826 BKT 2015 10 06 07 00 00 4786-99 G co CCGG 2833.070 -999.990 +.. V4 2015 11 23 11 46 00 -0.2020 100.3180 875.00 845.00 30.00 397827 BKT 2015 10 13 07 00 00 5249-99 G co CCGG 1643.630 -999.990 .N. V4 2015 11 20 16 40 00 -0.2020 100.3180 875.00 845.00 30.00 397828 BKT 2015 10 13 07 00 00 5250-99 G co CCGG 1643.340 -999.990 .N. V4 2015 11 20 16 56 00 -0.2020 100.3180 875.00 845.00 30.00 397829 BKT 2015 10 20 07 00 00 2639-99 G co CCGG 2283.360 -999.990 +.. V4 2015 12 18 12 17 00 -0.2020 100.3180 875.00 845.00 30.00 398883 BKT 2015 10 20 07 00 00 2640-99 G co CCGG 2247.280 -999.990 -.. V4 2015 12 18 12 33 00 -0.2020 100.3180 875.00 845.00 30.00 398884 BKT 2015 10 27 07 00 00 3477-99 G co CCGG 3169.860 -999.990 -.. V4 2015 12 18 12 49 00 -0.2020 100.3180 875.00 845.00 30.00 398885 BKT 2015 10 27 07 00 00 3478-99 G co CCGG 3186.930 -999.990 +.. V4 2015 12 18 13 05 00 -0.2020 100.3180 875.00 845.00 30.00 398886 BKT 2015 11 03 07 00 00 2794-99 G co CCGG 482.250 -999.990 .N. V4 2015 12 18 11 45 00 -0.2020 100.3180 875.00 845.00 30.00 398879 BKT 2015 11 03 07 00 00 4552-99 G co CCGG 479.680 -999.990 .N. V4 2015 12 18 12 01 00 -0.2020 100.3180 875.00 845.00 30.00 398880 BKT 2015 11 10 07 00 00 4576-99 G co CCGG 225.180 -999.990 ... V4 2015 12 18 11 14 00 -0.2020 100.3180 875.00 845.00 30.00 398881 BKT 2015 11 10 07 00 00 4977-99 G co CCGG 224.260 -999.990 ... V4 2015 12 18 11 30 00 -0.2020 100.3180 875.00 845.00 30.00 398882 BKT 2015 11 17 07 00 00 483-99 G co CCGG 145.560 -999.990 ... V4 2016 01 28 16 07 00 -0.2020 100.3180 875.00 845.00 30.00 401062 BKT 2015 11 17 07 00 00 5278-99 G co CCGG 145.000 -999.990 ... V4 2016 01 28 16 22 00 -0.2020 100.3180 875.00 845.00 30.00 401063 BKT 2015 11 24 07 00 00 1116-99 G co CCGG 152.760 -999.990 ... V4 2016 01 28 16 38 00 -0.2020 100.3180 875.00 845.00 30.00 401060 BKT 2015 11 24 07 00 00 4740-99 G co CCGG 151.320 -999.990 ... V4 2016 01 28 16 54 00 -0.2020 100.3180 875.00 845.00 30.00 401061 BKT 2015 12 15 07 00 00 256-99 G co CCGG 107.690 -999.990 ... V4 2016 01 28 15 35 00 -0.2020 100.3180 875.00 845.00 30.00 401058 BKT 2015 12 15 07 00 00 2574-99 G co CCGG 107.430 -999.990 ... V4 2016 01 28 15 51 00 -0.2020 100.3180 875.00 845.00 30.00 401059 BKT 2015 12 22 07 00 00 1740-99 G co CCGG 110.290 -999.990 ... V4 2016 01 28 15 19 00 -0.2020 100.3180 875.00 845.00 30.00 401057 BKT 2015 12 22 07 00 00 2725-99 G co CCGG 111.270 -999.990 ... V4 2016 01 28 15 03 00 -0.2020 100.3180 875.00 845.00 30.00 401056 BKT 2015 12 29 07 00 00 4190-99 G co CCGG 122.780 -999.990 ... V4 2016 01 28 14 31 00 -0.2020 100.3180 875.00 845.00 30.00 401054 BKT 2015 12 29 07 00 00 5349-99 G co CCGG 123.130 -999.990 ... V4 2016 01 28 14 47 00 -0.2020 100.3180 875.00 845.00 30.00 401055 BKT 2016 01 05 07 00 00 2708-99 G co CCGG 151.980 -999.990 ... V4 2016 01 28 14 00 00 -0.2020 100.3180 875.00 845.00 30.00 401052 BKT 2016 01 05 07 00 00 4975-99 G co CCGG 149.590 -999.990 ... V4 2016 01 28 14 15 00 -0.2020 100.3180 875.00 845.00 30.00 401053 BKT 2016 01 12 07 00 00 3934-99 G co CCGG 169.220 -999.990 ... V4 2016 03 16 13 02 00 -0.2020 100.3180 875.00 845.00 30.00 403673 BKT 2016 01 12 07 00 00 4310-99 G co CCGG 169.990 -999.990 ... V4 2016 03 16 13 18 00 -0.2020 100.3180 875.00 845.00 30.00 403674 BKT 2016 01 19 07 00 00 3666-99 G co CCGG 128.260 -999.990 ... V4 2016 03 16 12 31 00 -0.2020 100.3180 875.00 845.00 30.00 403671 BKT 2016 01 19 07 00 00 4657-99 G co CCGG 127.610 -999.990 ... V4 2016 03 16 12 47 00 -0.2020 100.3180 875.00 845.00 30.00 403672 BKT 2016 01 26 07 00 00 1943-99 G co CCGG 158.080 -999.990 N.. V4 2016 03 16 10 24 00 -0.2020 100.3180 875.00 845.00 30.00 403665 BKT 2016 01 26 07 00 00 1944-99 G co CCGG 153.520 -999.990 N.. V4 2016 03 16 10 40 00 -0.2020 100.3180 875.00 845.00 30.00 403666 BKT 2016 02 02 07 00 00 3479-99 G co CCGG 166.060 -999.990 ... V4 2016 03 16 10 56 00 -0.2020 100.3180 875.00 845.00 30.00 403663 BKT 2016 02 02 07 00 00 3480-99 G co CCGG 167.040 -999.990 ... V4 2016 03 16 11 12 00 -0.2020 100.3180 875.00 845.00 30.00 403664 BKT 2016 02 09 07 00 00 325-99 G co CCGG 224.210 -999.990 ... V4 2016 03 17 15 43 00 -0.2020 100.3180 875.00 845.00 30.00 403627 BKT 2016 02 09 07 00 00 4254-99 G co CCGG 224.490 -999.990 ... V4 2016 03 17 15 59 00 -0.2020 100.3180 875.00 845.00 30.00 403628 BKT 2016 02 16 07 00 00 2182-99 G co CCGG 189.330 -999.990 ... V4 2016 03 17 16 46 00 -0.2020 100.3180 875.00 845.00 30.00 403629 BKT 2016 02 16 07 00 00 3338-99 G co CCGG 189.020 -999.990 ... V4 2016 03 17 17 02 00 -0.2020 100.3180 875.00 845.00 30.00 403630 BKT 2016 02 23 07 00 00 3028-99 G co CCGG 182.620 -999.990 ... V4 2016 03 16 11 59 00 -0.2020 100.3180 875.00 845.00 30.00 403669 BKT 2016 02 23 07 00 00 4051-99 G co CCGG 181.710 -999.990 ... V4 2016 03 16 12 15 00 -0.2020 100.3180 875.00 845.00 30.00 403670 BKT 2016 03 01 07 00 00 2721-99 G co CCGG 191.190 -999.990 ... V4 2016 03 16 11 28 00 -0.2020 100.3180 875.00 845.00 30.00 403667 BKT 2016 03 01 07 00 00 3667-99 G co CCGG 194.920 -999.990 ... V4 2016 03 16 11 43 00 -0.2020 100.3180 875.00 845.00 30.00 403668 BKT 2016 03 08 07 00 00 84-99 G co CCGG 144.860 -999.990 ... V4 2016 06 22 17 07 00 -0.2020 100.3180 875.00 845.00 30.00 408718 BKT 2016 03 08 07 00 00 916-99 G co CCGG 144.180 -999.990 ... V4 2016 06 22 17 22 00 -0.2020 100.3180 875.00 845.00 30.00 408719 BKT 2016 03 15 07 01 00 1037-99 G co CCGG 133.720 -999.990 ... V4 2016 06 10 08 52 00 -0.2020 100.3180 875.00 845.00 30.00 408647 BKT 2016 03 15 07 01 00 4301-99 G co CCGG 135.060 -999.990 ... V4 2016 06 10 09 08 00 -0.2020 100.3180 875.00 845.00 30.00 408648 BKT 2016 03 22 07 00 00 1656-99 G co CCGG 111.010 -999.990 ... V4 2016 06 22 14 27 00 -0.2020 100.3180 875.00 845.00 30.00 408833 BKT 2016 03 22 07 00 00 5189-99 G co CCGG 109.800 -999.990 ... V4 2016 06 22 14 43 00 -0.2020 100.3180 875.00 845.00 30.00 408834 BKT 2016 03 29 07 02 00 3519-99 G co CCGG 224.990 -999.990 ... V4 2016 06 22 12 52 00 -0.2020 100.3180 875.00 845.00 30.00 408831 BKT 2016 03 29 07 02 00 3902-99 G co CCGG 225.170 -999.990 ... V4 2016 06 22 13 08 00 -0.2020 100.3180 875.00 845.00 30.00 408832 BKT 2016 04 05 07 00 00 2744-99 G co CCGG 165.750 -999.990 ... V4 2016 06 22 14 59 00 -0.2020 100.3180 875.00 845.00 30.00 408829 BKT 2016 04 05 07 00 00 3320-99 G co CCGG 165.350 -999.990 ... V4 2016 06 22 15 14 00 -0.2020 100.3180 875.00 845.00 30.00 408830 BKT 2016 04 12 07 00 00 3331-99 G co CCGG 92.990 -999.990 ... V4 2016 06 22 15 32 00 -0.2020 100.3180 875.00 845.00 30.00 408712 BKT 2016 04 12 07 00 00 4157-99 G co CCGG 92.940 -999.990 ... V4 2016 06 22 15 47 00 -0.2020 100.3180 875.00 845.00 30.00 408713 BKT 2016 04 19 07 00 00 1607-99 G co CCGG 155.110 -999.990 ... V4 2016 06 22 16 35 00 -0.2020 100.3180 875.00 845.00 30.00 408716 BKT 2016 04 19 07 00 00 3348-99 G co CCGG 160.860 -999.990 N.. V4 2016 06 22 16 51 00 -0.2020 100.3180 875.00 845.00 30.00 408717 BKT 2016 04 26 07 00 00 2146-99 G co CCGG 200.880 -999.990 ... V4 2016 06 22 16 03 00 -0.2020 100.3180 875.00 845.00 30.00 408714 BKT 2016 04 26 07 00 00 3539-99 G co CCGG 198.920 -999.990 ... V4 2016 06 22 16 19 00 -0.2020 100.3180 875.00 845.00 30.00 408715 BKT 2016 05 03 07 00 00 5313-99 G co CCGG 167.420 -999.990 ... V4 2016 09 22 14 16 00 -0.2020 100.3180 875.00 845.00 30.00 413695 BKT 2016 05 03 07 00 00 5314-99 G co CCGG 164.220 -999.990 ... V4 2016 09 22 14 32 00 -0.2020 100.3180 875.00 845.00 30.00 413694 BKT 2016 05 10 07 00 00 3605-99 G co CCGG 131.060 -999.990 ... V4 2016 09 22 13 38 00 -0.2020 100.3180 875.00 845.00 30.00 413692 BKT 2016 05 10 07 00 00 3606-99 G co CCGG 133.330 -999.990 ... V4 2016 09 22 13 54 00 -0.2020 100.3180 875.00 845.00 30.00 413693 BKT 2016 05 17 07 07 00 3228-99 G co CCGG 112.970 -999.990 ... V4 2016 09 22 13 22 00 -0.2020 100.3180 875.00 845.00 30.00 413690 BKT 2016 05 17 07 07 00 78-99 G co CCGG 113.310 -999.990 ... V4 2016 09 22 13 06 00 -0.2020 100.3180 875.00 845.00 30.00 413691 BKT 2016 05 17 07 59 00 2272-99 G co CCGG 92.730 -999.990 ... V4 2016 09 22 12 35 00 -0.2020 100.3180 875.00 845.00 30.00 413688 BKT 2016 05 17 07 59 00 5066-99 G co CCGG 90.760 -999.990 ... V4 2016 09 22 12 51 00 -0.2020 100.3180 875.00 845.00 30.00 413689 BKT 2016 05 23 07 00 00 1651-99 G co CCGG 74.470 -999.990 ... V4 2016 09 21 14 52 00 -0.2020 100.3180 875.00 845.00 30.00 413706 BKT 2016 05 23 07 00 00 1652-99 G co CCGG 72.410 -999.990 ... V4 2016 09 21 15 08 00 -0.2020 100.3180 875.00 845.00 30.00 413707 BKT 2016 05 31 07 00 00 4937-99 G co CCGG 97.870 -999.990 ... V4 2016 09 21 15 23 00 -0.2020 100.3180 875.00 845.00 30.00 413704 BKT 2016 05 31 07 00 00 4938-99 G co CCGG 97.510 -999.990 ... V4 2016 09 21 15 39 00 -0.2020 100.3180 875.00 845.00 30.00 413705 BKT 2016 06 07 07 01 00 2935-99 G co CCGG 139.350 -999.990 ... V4 2016 09 23 13 51 00 -0.2020 100.3180 875.00 845.00 30.00 413698 BKT 2016 06 07 07 01 00 2936-99 G co CCGG 133.610 -999.990 A.. V4 2016 09 23 14 07 00 -0.2020 100.3180 875.00 845.00 30.00 413699 BKT 2016 06 14 07 01 00 1359-99 G co CCGG 91.760 -999.990 ... V4 2016 09 23 14 23 00 -0.2020 100.3180 875.00 845.00 30.00 413696 BKT 2016 06 14 07 01 00 1360-99 G co CCGG 94.150 -999.990 ... V4 2016 09 23 14 39 00 -0.2020 100.3180 875.00 845.00 30.00 413697 BKT 2016 06 21 07 01 00 3135-99 G co CCGG 79.100 -999.990 ... V4 2016 09 21 15 55 00 -0.2020 100.3180 875.00 845.00 30.00 413708 BKT 2016 06 21 07 01 00 3136-99 G co CCGG 77.360 -999.990 ... V4 2016 09 21 16 11 00 -0.2020 100.3180 875.00 845.00 30.00 413709 BKT 2016 06 28 07 00 00 1871-99 G co CCGG 94.700 -999.990 N.. V4 2016 09 21 16 27 00 -0.2020 100.3180 875.00 845.00 30.00 413711 BKT 2016 06 28 07 00 00 1872-99 G co CCGG 87.850 -999.990 ... V4 2016 09 21 16 43 00 -0.2020 100.3180 875.00 845.00 30.00 413710 BKT 2016 07 06 07 00 00 414-99 G co CCGG 97.970 -999.990 ... V4 2016 09 23 13 17 00 -0.2020 100.3180 875.00 845.00 30.00 413700 BKT 2016 07 06 07 00 00 456-99 G co CCGG 96.890 -999.990 ... V4 2016 09 23 13 33 00 -0.2020 100.3180 875.00 845.00 30.00 413701 BKT 2016 07 12 07 00 00 1499-99 G co CCGG 99.610 -999.990 ... V4 2016 09 23 12 46 00 -0.2020 100.3180 875.00 845.00 30.00 413702 BKT 2016 07 12 07 00 00 4911-99 G co CCGG 102.310 -999.990 ... V4 2016 09 23 13 02 00 -0.2020 100.3180 875.00 845.00 30.00 413703 BKT 2016 07 19 07 00 00 1498-99 G co CCGG 78.000 -999.990 ... V4 2016 12 06 14 59 00 -0.2020 100.3180 875.00 845.00 30.00 417598 BKT 2016 07 19 07 00 00 4930-99 G co CCGG 76.940 -999.990 ... V4 2016 12 06 15 15 00 -0.2020 100.3180 875.00 845.00 30.00 417599 BKT 2016 07 26 07 02 00 2211-99 G co CCGG 81.900 -999.990 ... V4 2016 12 06 14 27 00 -0.2020 100.3180 875.00 845.00 30.00 417600 BKT 2016 07 26 07 02 00 5315-99 G co CCGG 81.990 -999.990 ... V4 2016 12 06 14 43 00 -0.2020 100.3180 875.00 845.00 30.00 417601 BKT 2016 08 02 07 00 00 1396-99 G co CCGG 85.700 -999.990 ... V4 2016 12 06 08 54 00 -0.2020 100.3180 875.00 845.00 30.00 417545 BKT 2016 08 02 07 00 00 1808-99 G co CCGG 84.930 -999.990 ... V4 2016 12 06 09 10 00 -0.2020 100.3180 875.00 845.00 30.00 417546 BKT 2016 08 09 07 00 00 1021-99 G co CCGG 111.220 -999.990 ... V4 2016 12 06 11 17 00 -0.2020 100.3180 875.00 845.00 30.00 417549 BKT 2016 08 09 07 00 00 2174-99 G co CCGG 109.620 -999.990 ... V4 2016 12 06 11 33 00 -0.2020 100.3180 875.00 845.00 30.00 417550 BKT 2016 08 16 07 00 00 192-99 G co CCGG 99.670 -999.990 ... V4 2016 12 07 16 59 00 -0.2020 100.3180 875.00 845.00 30.00 417557 BKT 2016 08 16 07 00 00 4403-99 G co CCGG 99.140 -999.990 ... V4 2016 12 07 17 15 00 -0.2020 100.3180 875.00 845.00 30.00 417558 BKT 2016 08 23 07 00 00 4618-99 G co CCGG 73.000 -999.990 ... V4 2016 12 07 16 27 00 -0.2020 100.3180 875.00 845.00 30.00 417555 BKT 2016 08 23 07 00 00 5167-99 G co CCGG 74.190 -999.990 ... V4 2016 12 07 16 43 00 -0.2020 100.3180 875.00 845.00 30.00 417556 BKT 2016 08 30 07 00 00 2177-99 G co CCGG 95.460 -999.990 ... V4 2016 12 02 14 08 00 -0.2020 100.3180 875.00 845.00 30.00 417563 BKT 2016 09 06 07 00 00 258-99 G co CCGG 86.210 -999.990 ... V4 2016 12 02 14 40 00 -0.2020 100.3180 875.00 845.00 30.00 417564 BKT 2016 09 06 07 00 00 4929-99 G co CCGG 87.320 -999.990 ... V4 2016 12 02 14 56 00 -0.2020 100.3180 875.00 845.00 30.00 417565 BKT 2016 09 13 07 00 00 2590-99 G co CCGG 86.330 -999.990 ... V4 2016 12 02 13 05 00 -0.2020 100.3180 875.00 845.00 30.00 417561 BKT 2016 09 13 07 00 00 3681-99 G co CCGG 85.960 -999.990 ... V4 2016 12 02 13 21 00 -0.2020 100.3180 875.00 845.00 30.00 417562 BKT 2016 09 20 07 00 00 2646-99 G co CCGG 69.980 -999.990 ... V4 2016 12 02 13 37 00 -0.2020 100.3180 875.00 845.00 30.00 417559 BKT 2016 09 20 07 00 00 3822-99 G co CCGG 68.370 -999.990 ... V4 2016 12 02 13 52 00 -0.2020 100.3180 875.00 845.00 30.00 417560 BKT 2016 09 27 07 00 00 1237-99 G co CCGG 85.680 -999.990 ... V4 2016 12 06 09 58 00 -0.2020 100.3180 875.00 845.00 30.00 417547 BKT 2016 09 27 07 00 00 4670-99 G co CCGG 84.200 -999.990 ... V4 2016 12 06 10 13 00 -0.2020 100.3180 875.00 845.00 30.00 417548 BKT 2016 10 04 07 00 00 2800-99 G co CCGG 94.910 -999.990 ... V4 2016 12 06 10 29 00 -0.2020 100.3180 875.00 845.00 30.00 417543 BKT 2016 10 04 07 00 00 4545-99 G co CCGG 92.850 -999.990 ... V4 2016 12 06 10 45 00 -0.2020 100.3180 875.00 845.00 30.00 417544 BKT 2016 10 11 07 00 00 3036-99 G co CCGG 80.800 -999.990 ... V4 2016 12 07 10 54 00 -0.2020 100.3180 875.00 845.00 30.00 417571 BKT 2016 10 11 07 00 00 572-99 G co CCGG 81.310 -999.990 ... V4 2016 12 07 10 38 00 -0.2020 100.3180 875.00 845.00 30.00 417570 BKT 2016 10 18 07 00 00 1296-99 G co CCGG 74.110 -999.990 N.. V4 2016 12 07 10 22 00 -0.2020 100.3180 875.00 845.00 30.00 417573 BKT 2016 10 18 07 00 00 241-99 G co CCGG 80.180 -999.990 N.. V4 2016 12 07 10 06 00 -0.2020 100.3180 875.00 845.00 30.00 417572 BKT 2016 10 25 07 04 00 211-99 G co CCGG 93.560 -999.990 ... V4 2016 12 07 15 24 00 -0.2020 100.3180 875.00 845.00 30.00 417551 BKT 2016 10 25 07 04 00 916-99 G co CCGG 93.220 -999.990 ... V4 2016 12 07 15 39 00 -0.2020 100.3180 875.00 845.00 30.00 417552 BKT 2016 11 01 07 00 00 1889-99 G co CCGG 83.970 -999.990 ... V4 2016 12 07 15 55 00 -0.2020 100.3180 875.00 845.00 30.00 417553 BKT 2016 11 01 07 00 00 5406-99 G co CCGG 83.200 -999.990 ... V4 2016 12 07 16 11 00 -0.2020 100.3180 875.00 845.00 30.00 417554 BKT 2016 11 08 07 00 00 2147-99 G co CCGG 88.390 -999.990 ... V4 2017 01 30 13 32 00 -0.2020 100.3180 875.00 845.00 30.00 419942 BKT 2016 11 08 07 00 00 4020-99 G co CCGG 88.450 -999.990 ... V4 2017 01 30 13 48 00 -0.2020 100.3180 875.00 845.00 30.00 419943 BKT 2016 11 15 07 00 00 3185-99 G co CCGG 101.640 -999.990 ... V4 2017 01 30 13 00 00 -0.2020 100.3180 875.00 845.00 30.00 419944 BKT 2016 11 15 07 00 00 4409-99 G co CCGG 102.250 -999.990 ... V4 2017 01 30 13 16 00 -0.2020 100.3180 875.00 845.00 30.00 419945 BKT 2016 11 22 07 00 00 3336-99 G co CCGG 78.670 -999.990 ... V4 2017 01 30 16 53 00 -0.2020 100.3180 875.00 845.00 30.00 419830 BKT 2016 11 22 07 00 00 3811-99 G co CCGG 78.700 -999.990 ... V4 2017 01 30 17 09 00 -0.2020 100.3180 875.00 845.00 30.00 419831 BKT 2016 11 29 07 00 00 2431-99 G co CCGG 86.270 -999.990 ... V4 2017 01 30 16 21 00 -0.2020 100.3180 875.00 845.00 30.00 419828 BKT 2016 11 29 07 00 00 4472-99 G co CCGG 85.630 -999.990 ... V4 2017 01 30 16 37 00 -0.2020 100.3180 875.00 845.00 30.00 419829 BKT 2016 12 13 07 00 00 3148-99 G co CCGG 100.970 -999.990 ... V4 2017 01 30 14 46 00 -0.2020 100.3180 875.00 845.00 30.00 419946 BKT 2016 12 13 07 00 00 4806-99 G co CCGG 100.860 -999.990 ... V4 2017 01 30 15 01 00 -0.2020 100.3180 875.00 845.00 30.00 419947 BKT 2016 12 20 07 00 00 1030-99 G co CCGG 95.940 -999.990 ... V4 2017 01 30 14 14 00 -0.2020 100.3180 875.00 845.00 30.00 419948 BKT 2016 12 20 07 00 00 5444-99 G co CCGG 95.150 -999.990 ... V4 2017 01 30 14 30 00 -0.2020 100.3180 875.00 845.00 30.00 419949 BKT 2016 12 27 07 00 00 2739-99 G co CCGG 152.700 -999.990 ... V4 2017 01 30 17 25 00 -0.2020 100.3180 875.00 845.00 30.00 419834 BKT 2016 12 27 07 00 00 3567-99 G co CCGG 152.460 -999.990 ... V4 2017 01 30 17 41 00 -0.2020 100.3180 875.00 845.00 30.00 419835 BKT 2017 01 03 07 00 00 3006-99 G co CCGG 109.450 -999.990 ... V4 2017 01 31 09 39 00 -0.2020 100.3180 875.00 845.00 30.00 419832 BKT 2017 01 03 07 00 00 3415-99 G co CCGG 108.800 -999.990 ... V4 2017 01 31 09 55 00 -0.2020 100.3180 875.00 845.00 30.00 419833 BKT 2017 01 10 07 00 00 121-99 G co CCGG 131.950 -999.990 ... V4 2017 02 21 10 52 00 -0.2020 100.3180 875.00 845.00 30.00 420721 BKT 2017 01 10 07 00 00 122-99 G co CCGG 131.240 -999.990 ... V4 2017 02 21 11 08 00 -0.2020 100.3180 875.00 845.00 30.00 420722 BKT 2017 01 17 07 00 00 655-99 G co CCGG 129.290 -999.990 ... V4 2017 02 17 15 04 00 -0.2020 100.3180 875.00 845.00 30.00 420725 BKT 2017 01 17 07 00 00 656-99 G co CCGG 128.340 -999.990 ... V4 2017 02 17 15 20 00 -0.2020 100.3180 875.00 845.00 30.00 420726 BKT 2017 01 24 07 00 00 3523-99 G co CCGG 99.590 -999.990 ... V4 2017 02 17 14 16 00 -0.2020 100.3180 875.00 845.00 30.00 420724 BKT 2017 01 24 07 00 00 830-99 G co CCGG 100.590 -999.990 ... V4 2017 02 17 14 00 00 -0.2020 100.3180 875.00 845.00 30.00 420723 BKT 2017 01 31 07 00 00 1598-99 G co CCGG 104.360 -999.990 ... V4 2017 02 17 14 32 00 -0.2020 100.3180 875.00 845.00 30.00 420719 BKT 2017 01 31 07 00 00 4087-99 G co CCGG 103.780 -999.990 ... V4 2017 02 17 14 48 00 -0.2020 100.3180 875.00 845.00 30.00 420720 BKT 2017 02 07 07 00 00 1049-99 G co CCGG 85.710 -999.990 ... V4 2017 03 13 17 44 00 -0.2020 100.3180 875.00 845.00 30.00 422276 BKT 2017 02 07 07 00 00 687-99 G co CCGG 85.470 -999.990 ... V4 2017 03 13 17 28 00 -0.2020 100.3180 875.00 845.00 30.00 422277 BKT 2017 02 14 07 00 00 1016-99 G co CCGG 174.190 -999.990 ... V4 2017 03 14 09 05 00 -0.2020 100.3180 875.00 845.00 30.00 422274 BKT 2017 02 14 07 00 00 5536-99 G co CCGG 174.840 -999.990 ... V4 2017 03 14 09 21 00 -0.2020 100.3180 875.00 845.00 30.00 422275 BKT 2017 02 21 07 03 00 1911-99 G co CCGG 138.960 -999.990 ... V4 2017 04 12 12 29 00 -0.2020 100.3180 875.00 845.00 30.00 423583 BKT 2017 02 21 07 03 00 437-99 G co CCGG 137.530 -999.990 ... V4 2017 04 12 12 13 00 -0.2020 100.3180 875.00 845.00 30.00 423584 BKT 2017 02 28 07 01 00 4425-99 G co CCGG 93.850 -999.990 ... V4 2017 04 12 13 48 00 -0.2020 100.3180 875.00 845.00 30.00 423585 BKT 2017 02 28 07 01 00 4529-99 G co CCGG 93.860 -999.990 ... V4 2017 04 12 14 04 00 -0.2020 100.3180 875.00 845.00 30.00 423586 BKT 2017 03 07 07 00 00 2559-99 G co CCGG 100.900 -999.990 ... V4 2017 04 12 13 01 00 -0.2020 100.3180 875.00 845.00 30.00 423589 BKT 2017 03 07 07 00 00 417-99 G co CCGG 101.010 -999.990 ... V4 2017 04 12 12 45 00 -0.2020 100.3180 875.00 845.00 30.00 423590 BKT 2017 03 14 07 00 00 179-99 G co CCGG 154.780 -999.990 ... V4 2017 04 12 14 20 00 -0.2020 100.3180 875.00 845.00 30.00 423587 BKT 2017 03 14 07 00 00 5479-99 G co CCGG 155.170 -999.990 ... V4 2017 04 12 14 36 00 -0.2020 100.3180 875.00 845.00 30.00 423588 BKT 2017 03 21 07 00 00 1863-99 G co CCGG 97.780 -999.990 N.. V4 2017 05 01 10 27 00 -0.2020 100.3180 875.00 845.00 30.00 424432 BKT 2017 03 21 07 00 00 2844-99 G co CCGG 103.700 -999.990 N.. V4 2017 05 01 10 11 00 -0.2020 100.3180 875.00 845.00 30.00 424433 BKT 2017 03 28 07 00 00 2604-99 G co CCGG 128.080 -999.990 ... V4 2017 05 01 09 55 00 -0.2020 100.3180 875.00 845.00 30.00 424430 BKT 2017 03 28 07 00 00 4674-99 G co CCGG 128.900 -999.990 ... V4 2017 05 01 10 42 00 -0.2020 100.3180 875.00 845.00 30.00 424431 BKT 2017 04 04 07 00 00 81-99 G co CCGG 100.900 -999.990 ... V4 2017 04 28 17 23 00 -0.2020 100.3180 875.00 845.00 30.00 424426 BKT 2017 04 04 07 00 00 82-99 G co CCGG 101.930 -999.990 ... V4 2017 04 28 17 39 00 -0.2020 100.3180 875.00 845.00 30.00 424427 BKT 2017 04 11 07 00 00 5367-99 G co CCGG 110.620 -999.990 ... V4 2017 04 28 17 07 00 -0.2020 100.3180 875.00 845.00 30.00 424428 BKT 2017 04 11 07 00 00 5368-99 G co CCGG 109.380 -999.990 ... V4 2017 04 28 16 51 00 -0.2020 100.3180 875.00 845.00 30.00 424429 BKT 2017 04 18 07 00 00 2561-99 G co CCGG 97.940 -999.990 ... V2 2017 06 06 12 05 00 -0.2020 100.3180 875.00 845.00 30.00 426039 BKT 2017 04 18 07 00 00 3878-99 G co CCGG 96.610 -999.990 ... V2 2017 06 06 12 21 00 -0.2020 100.3180 875.00 845.00 30.00 426040 BKT 2017 04 25 07 00 00 2339-99 G co CCGG 118.540 -999.990 ... V2 2017 06 06 12 36 00 -0.2020 100.3180 875.00 845.00 30.00 426037 BKT 2017 04 25 07 00 00 4005-99 G co CCGG 118.580 -999.990 ... V2 2017 06 06 12 52 00 -0.2020 100.3180 875.00 845.00 30.00 426038 BKT 2017 05 02 07 00 00 1560-99 G co CCGG 117.770 -999.990 ... V2 2017 06 06 14 59 00 -0.2020 100.3180 875.00 845.00 30.00 426042 BKT 2017 05 02 07 00 00 485-99 G co CCGG 117.670 -999.990 ... V2 2017 06 06 14 43 00 -0.2020 100.3180 875.00 845.00 30.00 426041 BKT 2017 05 09 07 00 00 1696-99 G co CCGG 102.920 -999.990 ... V2 2017 06 06 14 28 00 -0.2020 100.3180 875.00 845.00 30.00 426043 BKT 2017 05 09 07 00 00 87-99 G co CCGG 103.520 -999.990 ... V2 2017 06 06 14 12 00 -0.2020 100.3180 875.00 845.00 30.00 426044 BKT 2017 05 16 07 00 00 3455-99 G co CCGG 76.840 -999.990 ... V2 2017 07 13 09 12 00 -0.2020 100.3180 875.00 845.00 30.00 427507 BKT 2017 05 16 07 00 00 4493-99 G co CCGG 76.650 -999.990 ... V2 2017 07 13 09 28 00 -0.2020 100.3180 875.00 845.00 30.00 427508 BKT 2017 05 23 07 06 00 2422-99 G co CCGG 77.470 -999.990 ... V2 2017 07 13 09 44 00 -0.2020 100.3180 875.00 845.00 30.00 427505 BKT 2017 05 23 07 06 00 5281-99 G co CCGG 77.310 -999.990 ... V2 2017 07 13 10 00 00 -0.2020 100.3180 875.00 845.00 30.00 427506 BKT 2017 05 30 07 00 00 3108-99 G co CCGG 86.090 -999.990 ... V2 2017 07 28 13 29 00 -0.2020 100.3180 875.00 845.00 30.00 428461 BKT 2017 05 30 07 00 00 506-99 G co CCGG 86.670 -999.990 ... V2 2017 07 28 13 13 00 -0.2020 100.3180 875.00 845.00 30.00 428462 BKT 2017 06 06 07 00 00 3774-99 G co CCGG 83.450 -999.990 ... V2 2017 08 03 11 44 00 -0.2020 100.3180 875.00 845.00 30.00 428469 BKT 2017 06 06 07 00 00 5700-99 G co CCGG 84.030 -999.990 ... V2 2017 08 03 12 00 00 -0.2020 100.3180 875.00 845.00 30.00 428470 BKT 2017 06 13 07 00 00 3773-99 G co CCGG 98.040 -999.990 ... V2 2017 07 28 15 20 00 -0.2020 100.3180 875.00 845.00 30.00 428463 BKT 2017 06 13 07 00 00 5699-99 G co CCGG 97.680 -999.990 ... V2 2017 07 28 15 36 00 -0.2020 100.3180 875.00 845.00 30.00 428464 BKT 2017 06 20 07 00 00 21-99 G co CCGG 97.080 -999.990 ... V2 2017 08 03 13 51 00 -0.2020 100.3180 875.00 845.00 30.00 428485 BKT 2017 06 20 07 00 00 4763-99 G co CCGG 97.920 -999.990 ... V2 2017 08 03 14 06 00 -0.2020 100.3180 875.00 845.00 30.00 428486 BKT 2017 06 27 07 00 00 4500-99 G co CCGG 109.300 -999.990 ... V2 2017 08 03 10 56 00 -0.2020 100.3180 875.00 845.00 30.00 428466 BKT 2017 06 27 07 00 00 955-99 G co CCGG 109.320 -999.990 ... V2 2017 08 03 10 40 00 -0.2020 100.3180 875.00 845.00 30.00 428465 BKT 2017 07 04 07 00 00 2533-99 G co CCGG 103.800 -999.990 ... V2 2017 08 03 11 28 00 -0.2020 100.3180 875.00 845.00 30.00 428467 BKT 2017 07 04 07 00 00 324-99 G co CCGG 103.320 -999.990 ... V2 2017 08 03 11 12 00 -0.2020 100.3180 875.00 845.00 30.00 428468 BKT 2017 07 11 07 00 00 3647-99 G co CCGG 71.810 -999.990 ... V2 2017 09 11 12 25 00 -0.2020 100.3180 875.00 845.00 30.00 430190 BKT 2017 07 11 07 00 00 3648-99 G co CCGG 70.610 -999.990 ... V2 2017 09 11 12 40 00 -0.2020 100.3180 875.00 845.00 30.00 430191 BKT 2017 07 18 07 00 00 3474-99 G co CCGG 91.270 -999.990 ... V2 2017 09 11 12 56 00 -0.2020 100.3180 875.00 845.00 30.00 430192 BKT 2017 07 18 07 00 00 4951-99 G co CCGG 91.100 -999.990 ... V2 2017 09 11 13 12 00 -0.2020 100.3180 875.00 845.00 30.00 430193 BKT 2017 07 25 07 00 00 5231-99 G co CCGG 151.990 -999.990 ... V2 2017 09 11 15 35 00 -0.2020 100.3180 875.00 845.00 30.00 430200 BKT 2017 07 25 07 00 00 5232-99 G co CCGG 153.490 -999.990 ... V2 2017 09 11 15 51 00 -0.2020 100.3180 875.00 845.00 30.00 430201 BKT 2017 08 01 07 00 00 1222-99 G co CCGG 98.530 -999.990 ... V2 2017 09 11 15 03 00 -0.2020 100.3180 875.00 845.00 30.00 430198 BKT 2017 08 01 07 00 00 1330-99 G co CCGG 96.520 -999.990 ... V2 2017 09 11 15 19 00 -0.2020 100.3180 875.00 845.00 30.00 430199 BKT 2017 08 08 07 00 00 2025-99 G co CCGG 85.670 -999.990 ... V2 2017 09 11 11 21 00 -0.2020 100.3180 875.00 845.00 30.00 430186 BKT 2017 08 08 07 00 00 3906-99 G co CCGG 83.840 -999.990 ... V2 2017 09 11 11 37 00 -0.2020 100.3180 875.00 845.00 30.00 430187 BKT 2017 08 15 07 00 00 1183-99 G co CCGG 88.130 -999.990 ... V2 2017 09 11 11 53 00 -0.2020 100.3180 875.00 845.00 30.00 430188 BKT 2017 08 15 07 00 00 4706-99 G co CCGG 88.320 -999.990 ... V2 2017 09 11 12 09 00 -0.2020 100.3180 875.00 845.00 30.00 430189 BKT 2017 08 22 07 00 00 224-99 G co CCGG 93.110 -999.990 ... V2 2017 11 02 10 43 00 -0.2020 100.3180 875.00 845.00 30.00 432946 BKT 2017 08 29 07 00 00 394-99 G co CCGG 89.920 -999.990 ... V2 2017 10 27 10 44 00 -0.2020 100.3180 875.00 845.00 30.00 432949 BKT 2017 08 29 07 00 00 577-99 G co CCGG 90.630 -999.990 ... V2 2017 10 27 11 00 00 -0.2020 100.3180 875.00 845.00 30.00 432950 BKT 2017 09 05 07 00 00 2922-99 G co CCGG 124.300 -999.990 ... V2 2017 11 01 15 18 00 -0.2020 100.3180 875.00 845.00 30.00 433346 BKT 2017 09 05 07 00 00 4331-99 G co CCGG 124.180 -999.990 ... V2 2017 11 01 15 34 00 -0.2020 100.3180 875.00 845.00 30.00 433347 BKT 2017 09 12 07 00 00 4767-99 G co CCGG 151.790 -999.990 ... V2 2017 10 30 13 06 00 -0.2020 100.3180 875.00 845.00 30.00 432953 BKT 2017 09 12 07 00 00 5396-99 G co CCGG 150.670 -999.990 ... V2 2017 10 30 13 22 00 -0.2020 100.3180 875.00 845.00 30.00 432954 BKT 2017 09 19 07 00 00 3044-99 G co CCGG 119.800 -999.990 ... V2 2017 10 27 13 24 00 -0.2020 100.3180 875.00 845.00 30.00 432951 BKT 2017 09 19 07 00 00 4927-99 G co CCGG 118.890 -999.990 ... V2 2017 10 27 13 40 00 -0.2020 100.3180 875.00 845.00 30.00 432952 BKT 2017 09 26 07 00 00 2749-99 G co CCGG 110.940 -999.990 ... V2 2017 10 27 12 52 00 -0.2020 100.3180 875.00 845.00 30.00 432947 BKT 2017 09 26 07 00 00 4083-99 G co CCGG 110.750 -999.990 ... V2 2017 10 27 13 08 00 -0.2020 100.3180 875.00 845.00 30.00 432948 BKT 2017 10 03 07 00 00 1961-99 G co CCGG 85.740 -999.990 ... V2 2017 11 09 12 16 00 -0.2020 100.3180 875.00 845.00 30.00 433892 BKT 2017 10 03 07 00 00 393-99 G co CCGG 85.960 -999.990 ... V2 2017 11 09 12 00 00 -0.2020 100.3180 875.00 845.00 30.00 433891 BKT 2017 10 10 07 00 00 2339-99 G co CCGG 71.040 -999.990 ... V2 2017 11 09 12 48 00 -0.2020 100.3180 875.00 845.00 30.00 433890 BKT 2017 10 10 07 00 00 669-99 G co CCGG 71.280 -999.990 ... V2 2017 11 09 12 32 00 -0.2020 100.3180 875.00 845.00 30.00 433889 BKT 2017 10 17 07 00 00 1131-99 G co CCGG 89.270 -999.990 ... V2 2017 11 13 11 47 00 -0.2020 100.3180 875.00 845.00 30.00 433909 BKT 2017 10 17 07 00 00 3822-99 G co CCGG 89.600 -999.990 ... V2 2017 11 13 11 15 00 -0.2020 100.3180 875.00 845.00 30.00 433912 BKT 2017 10 24 07 05 00 1137-99 G co CCGG 117.380 -999.990 ... V2 2017 11 13 11 31 00 -0.2020 100.3180 875.00 845.00 30.00 433911 BKT 2017 10 24 07 05 00 4431-99 G co CCGG 115.460 -999.990 ... V2 2017 11 13 12 02 00 -0.2020 100.3180 875.00 845.00 30.00 433910 BKT 2017 10 31 07 00 00 5316-99 G co CCGG 85.190 -999.990 ... V2 2018 01 12 12 49 00 -0.2020 100.3180 875.00 845.00 30.00 436783 BKT 2017 10 31 07 00 00 578-99 G co CCGG 84.830 -999.990 ... V2 2018 01 12 12 33 00 -0.2020 100.3180 875.00 845.00 30.00 436782 BKT 2017 11 07 07 00 00 3-99 G co CCGG 102.650 -999.990 ... V2 2018 01 12 11 30 00 -0.2020 100.3180 875.00 845.00 30.00 436784 BKT 2017 11 07 07 00 00 3148-99 G co CCGG 103.110 -999.990 ... V2 2018 01 12 11 45 00 -0.2020 100.3180 875.00 845.00 30.00 436785 BKT 2017 11 14 07 00 00 1466-99 G co CCGG 98.020 -999.990 ... V2 2018 01 12 11 09 00 -0.2020 100.3180 875.00 845.00 30.00 436781 BKT 2017 11 21 07 00 00 1239-99 G co CCGG 95.330 -999.990 ... V2 2018 01 12 13 05 00 -0.2020 100.3180 875.00 845.00 30.00 436779 BKT 2017 11 21 07 00 00 1802-99 G co CCGG 95.470 -999.990 ... V2 2018 01 12 13 20 00 -0.2020 100.3180 875.00 845.00 30.00 436780 BKT 2017 11 28 07 00 00 1013-99 G co CCGG 103.660 -999.990 ... V2 2018 01 10 15 42 00 -0.2020 100.3180 875.00 845.00 30.00 436774 BKT 2017 11 28 07 00 00 2707-99 G co CCGG 102.280 -999.990 ... V2 2018 01 10 15 58 00 -0.2020 100.3180 875.00 845.00 30.00 436773 BKT 2017 12 05 07 00 00 3549-99 G co CCGG 86.080 -999.990 ... V2 2018 01 10 15 10 00 -0.2020 100.3180 875.00 845.00 30.00 436771 BKT 2017 12 05 07 00 00 4019-99 G co CCGG 87.840 -999.990 ... V2 2018 01 10 15 26 00 -0.2020 100.3180 875.00 845.00 30.00 436772 BKT 2017 12 12 07 00 00 1050-99 G co CCGG 107.160 -999.990 ... V2 2018 01 18 12 39 00 -0.2020 100.3180 875.00 845.00 30.00 436647 BKT 2017 12 12 07 00 00 1086-99 G co CCGG 107.130 -999.990 ... V2 2018 01 18 12 55 00 -0.2020 100.3180 875.00 845.00 30.00 436648 BKT 2017 12 19 07 00 00 1690-99 G co CCGG 164.100 -999.990 ... V2 2018 01 18 13 47 00 -0.2020 100.3180 875.00 845.00 30.00 436646 BKT 2017 12 19 07 00 00 4324-99 G co CCGG 166.080 -999.990 ... V2 2018 01 18 14 03 00 -0.2020 100.3180 875.00 845.00 30.00 436645 BKT 2017 12 26 07 00 00 2445-99 G co CCGG 124.040 -999.990 ... V2 2018 02 21 10 53 00 -0.2020 100.3180 875.00 845.00 30.00 438239 BKT 2017 12 26 07 00 00 3619-99 G co CCGG 123.120 -999.990 ... V2 2018 02 21 11 09 00 -0.2020 100.3180 875.00 845.00 30.00 438240 BKT 2018 01 02 07 00 00 301-99 G co CCGG 118.620 -999.990 ... V2 2018 02 21 11 24 00 -0.2020 100.3180 875.00 845.00 30.00 438241 BKT 2018 01 02 07 00 00 5677-99 G co CCGG 117.210 -999.990 ... V2 2018 02 21 11 40 00 -0.2020 100.3180 875.00 845.00 30.00 438242 BKT 2018 01 09 07 00 00 2822-99 G co CCGG 124.940 -999.990 ... V2 2018 02 21 09 49 00 -0.2020 100.3180 875.00 845.00 30.00 438237 BKT 2018 01 09 07 00 00 4827-99 G co CCGG 127.050 -999.990 ... V2 2018 02 21 10 05 00 -0.2020 100.3180 875.00 845.00 30.00 438238 BKT 2018 01 16 07 00 00 1042-99 G co CCGG 157.490 -999.990 ... V2 2018 02 21 10 21 00 -0.2020 100.3180 875.00 845.00 30.00 438235 BKT 2018 01 16 07 00 00 2327-99 G co CCGG 157.830 -999.990 ... V2 2018 02 21 10 37 00 -0.2020 100.3180 875.00 845.00 30.00 438236 BKT 2018 01 23 07 00 00 407-99 G co CCGG 155.120 -999.990 ... V2 2018 03 09 10 09 00 -0.2020 100.3180 875.00 845.00 30.00 439806 BKT 2018 01 23 07 00 00 5033-99 G co CCGG 155.200 -999.990 ... V2 2018 03 09 10 25 00 -0.2020 100.3180 875.00 845.00 30.00 439807 BKT 2018 01 30 07 00 00 2034-99 G co CCGG 136.100 -999.990 ... V2 2018 03 09 09 37 00 -0.2020 100.3180 875.00 845.00 30.00 439804 BKT 2018 01 30 07 00 00 4244-99 G co CCGG 135.240 -999.990 ... V2 2018 03 09 09 53 00 -0.2020 100.3180 875.00 845.00 30.00 439805 BKT 2018 02 06 07 00 00 329-99 G co CCGG 280.860 -999.990 .X. V2 2018 03 09 08 33 00 -0.2020 100.3180 875.00 845.00 30.00 439808 BKT 2018 02 06 07 00 00 3591-99 G co CCGG 284.120 -999.990 .X. V2 2018 03 09 08 49 00 -0.2020 100.3180 875.00 845.00 30.00 439809 BKT 2018 02 13 07 00 00 2311-99 G co CCGG 201.230 -999.990 ... V2 2018 03 09 09 05 00 -0.2020 100.3180 875.00 845.00 30.00 439810 BKT 2018 02 13 07 00 00 5120-99 G co CCGG 200.150 -999.990 ... V2 2018 03 09 09 21 00 -0.2020 100.3180 875.00 845.00 30.00 439811 BKT 2018 02 20 07 00 00 2009-99 G co CCGG 236.920 -999.990 ... V2 2018 04 02 12 31 00 -0.2020 100.3180 875.00 845.00 30.00 440802 BKT 2018 02 20 07 00 00 224-99 G co CCGG 236.180 -999.990 ... V2 2018 04 02 12 15 00 -0.2020 100.3180 875.00 845.00 30.00 440801 BKT 2018 02 27 07 00 00 3520-99 G co CCGG 126.840 -999.990 ... V2 2018 04 02 13 03 00 -0.2020 100.3180 875.00 845.00 30.00 440800 BKT 2018 02 27 07 00 00 820-99 G co CCGG 127.280 -999.990 ... V2 2018 04 02 12 47 00 -0.2020 100.3180 875.00 845.00 30.00 440799 BKT 2018 03 06 07 00 00 3023-99 G co CCGG 121.070 -999.990 ... V2 2018 04 02 11 28 00 -0.2020 100.3180 875.00 845.00 30.00 440796 BKT 2018 03 06 07 00 00 704-99 G co CCGG 122.270 -999.990 ... V2 2018 04 02 11 12 00 -0.2020 100.3180 875.00 845.00 30.00 440795 BKT 2018 03 13 07 00 00 4299-99 G co CCGG 175.860 -999.990 N.. V2 2018 04 02 11 44 00 -0.2020 100.3180 875.00 845.00 30.00 440797 BKT 2018 03 13 07 00 00 5652-99 G co CCGG 208.100 -999.990 N.. V2 2018 04 02 11 59 00 -0.2020 100.3180 875.00 845.00 30.00 440798 BKT 2018 03 20 07 00 00 5616-99 G co CCGG 124.380 -999.990 ... V2 2018 04 19 12 42 00 -0.2020 100.3180 875.00 845.00 30.00 441728 BKT 2018 03 20 07 00 00 798-99 G co CCGG 124.620 -999.990 ... V2 2018 04 19 12 26 00 -0.2020 100.3180 875.00 845.00 30.00 441727 BKT 2018 03 27 07 00 00 1145-99 G co CCGG 110.400 -999.990 ... V2 2018 04 19 12 58 00 -0.2020 100.3180 875.00 845.00 30.00 441729 BKT 2018 03 27 07 00 00 4239-99 G co CCGG 109.680 -999.990 ... V2 2018 04 19 13 13 00 -0.2020 100.3180 875.00 845.00 30.00 441730 BKT 2018 04 03 07 00 00 2190-99 G co CCGG 120.750 -999.990 ... V2 2018 05 04 14 35 00 -0.2020 100.3180 875.00 845.00 30.00 442651 BKT 2018 04 03 07 00 00 3941-99 G co CCGG 121.290 -999.990 ... V2 2018 05 04 14 51 00 -0.2020 100.3180 875.00 845.00 30.00 442652 BKT 2018 04 10 07 00 00 1951-99 G co CCGG 164.820 -999.990 ... V2 2018 05 04 14 03 00 -0.2020 100.3180 875.00 845.00 30.00 442653 BKT 2018 04 10 07 00 00 3936-99 G co CCGG 164.150 -999.990 ... V2 2018 05 04 14 19 00 -0.2020 100.3180 875.00 845.00 30.00 442654 BKT 2018 04 17 07 00 00 1476-99 G co CCGG 128.400 -999.990 ... V2 2018 05 10 13 48 00 -0.2020 100.3180 875.00 845.00 30.00 442986 BKT 2018 04 17 07 00 00 2288-99 G co CCGG 128.970 -999.990 ... V2 2018 05 10 14 04 00 -0.2020 100.3180 875.00 845.00 30.00 442987 BKT 2018 04 24 07 00 00 2401-99 G co CCGG 82.700 -999.990 ... V2 2018 05 10 15 23 00 -0.2020 100.3180 875.00 845.00 30.00 442988 BKT 2018 04 24 07 00 00 4847-99 G co CCGG 91.450 -999.990 N.. V2 2018 05 10 15 39 00 -0.2020 100.3180 875.00 845.00 30.00 442989 BKT 2018 05 01 07 00 00 1183-99 G co CCGG 156.530 -999.990 N.. V2 2018 05 29 15 40 00 -0.2020 100.3180 875.00 845.00 30.00 444031 BKT 2018 05 01 07 00 00 4706-99 G co CCGG 147.310 -999.990 N.. V2 2018 05 29 15 55 00 -0.2020 100.3180 875.00 845.00 30.00 444032 BKT 2018 05 08 07 00 00 2025-99 G co CCGG 141.200 -999.990 ... V2 2018 05 29 16 11 00 -0.2020 100.3180 875.00 845.00 30.00 444029 BKT 2018 05 08 07 00 00 4232-99 G co CCGG 140.680 -999.990 ... V2 2018 05 29 16 27 00 -0.2020 100.3180 875.00 845.00 30.00 444030 BKT 2018 05 15 07 00 00 1255-99 G co CCGG 143.760 -999.990 ... V2 2018 06 08 09 02 00 -0.2020 100.3180 875.00 845.00 30.00 444832 BKT 2018 05 15 07 00 00 4046-99 G co CCGG 142.360 -999.990 ... V2 2018 06 08 09 18 00 -0.2020 100.3180 875.00 845.00 30.00 444833 BKT 2018 05 22 07 00 00 202-99 G co CCGG 149.610 -999.990 ... V2 2018 06 12 10 52 00 -0.2020 100.3180 875.00 845.00 30.00 444904 BKT 2018 05 22 07 00 00 2855-99 G co CCGG 147.800 -999.990 ... V2 2018 06 12 11 07 00 -0.2020 100.3180 875.00 845.00 30.00 444905 BKT 2018 05 29 07 00 00 3334-99 G co CCGG 101.930 -999.990 ... V2 2018 07 06 11 13 00 -0.2020 100.3180 875.00 845.00 30.00 445930 BKT 2018 05 29 07 00 00 5111-99 G co CCGG 102.210 -999.990 ... V2 2018 07 06 11 28 00 -0.2020 100.3180 875.00 845.00 30.00 445931 BKT 2018 06 05 07 00 00 4738-99 G co CCGG 78.120 -999.990 ... V2 2018 07 05 17 46 00 -0.2020 100.3180 875.00 845.00 30.00 445932 BKT 2018 06 05 07 00 00 5477-99 G co CCGG 78.160 -999.990 ... V2 2018 07 05 18 02 00 -0.2020 100.3180 875.00 845.00 30.00 445933 BKT 2018 06 12 07 00 00 2254-99 G co CCGG 319.940 -999.990 N.. V2 2018 07 06 12 47 00 -0.2020 100.3180 875.00 845.00 30.00 445938 BKT 2018 06 12 07 00 00 5010-99 G co CCGG 330.750 -999.990 N.. V2 2018 07 06 13 03 00 -0.2020 100.3180 875.00 845.00 30.00 445939 BKT 2018 06 19 07 00 00 2942-99 G co CCGG 72.570 -999.990 ... V2 2018 07 06 13 19 00 -0.2020 100.3180 875.00 845.00 30.00 445940 BKT 2018 06 19 07 00 00 2995-99 G co CCGG 72.820 -999.990 ... V2 2018 07 06 13 35 00 -0.2020 100.3180 875.00 845.00 30.00 445941 BKT 2018 06 26 07 00 00 1880-99 G co CCGG 96.370 -999.990 ... V2 2018 07 20 15 54 00 -0.2020 100.3180 875.00 845.00 30.00 446474 BKT 2018 06 26 07 00 00 767-99 G co CCGG 96.960 -999.990 ... V2 2018 07 20 15 38 00 -0.2020 100.3180 875.00 845.00 30.00 446473 BKT 2018 07 03 07 00 00 1277-99 G co CCGG 82.930 -999.990 ... V2 2018 07 20 14 03 00 -0.2020 100.3180 875.00 845.00 30.00 446475 BKT 2018 07 03 07 00 00 3210-99 G co CCGG 82.160 -999.990 ... V2 2018 07 20 14 19 00 -0.2020 100.3180 875.00 845.00 30.00 446476 BKT 2018 07 10 07 00 00 1191-99 G co CCGG 71.100 -999.990 ... V2 2018 08 09 10 54 00 -0.2020 100.3180 875.00 845.00 30.00 447241 BKT 2018 07 10 07 00 00 2054-99 G co CCGG 69.830 -999.990 ... V2 2018 08 09 11 10 00 -0.2020 100.3180 875.00 845.00 30.00 447242 BKT 2018 07 17 07 00 00 3118-99 G co CCGG 100.890 -999.990 ... V2 2018 08 06 13 00 00 -0.2020 100.3180 875.00 845.00 30.00 447056 BKT 2018 07 17 07 00 00 3473-99 G co CCGG 100.360 -999.990 ... V2 2018 08 06 13 16 00 -0.2020 100.3180 875.00 845.00 30.00 447057 BKT 2018 07 24 07 00 00 3063-99 G co CCGG 124.210 -999.990 N.. V2 2018 08 29 16 12 00 -0.2020 100.3180 875.00 845.00 30.00 448209 BKT 2018 07 24 07 00 00 884-99 G co CCGG 91.630 -999.990 ... V2 2018 08 29 15 56 00 -0.2020 100.3180 875.00 845.00 30.00 448208 BKT 2018 07 31 07 00 00 4823-99 G co CCGG 74.400 -999.990 ... V2 2018 08 29 14 06 00 -0.2020 100.3180 875.00 845.00 30.00 448210 BKT 2018 07 31 07 00 00 523-99 G co CCGG 74.670 -999.990 ... V2 2018 08 29 13 50 00 -0.2020 100.3180 875.00 845.00 30.00 448211 BKT 2018 08 07 07 00 00 300-99 G co CCGG 70.000 -999.990 A.. V2 2018 09 27 09 02 00 -0.2020 100.3180 875.00 845.00 30.00 449485 BKT 2018 08 07 07 00 00 3026-99 G co CCGG 87.900 -999.990 A.. V2 2018 09 27 09 18 00 -0.2020 100.3180 875.00 845.00 30.00 449486 BKT 2018 08 14 07 00 00 2018-99 G co CCGG 92.690 -999.990 ... V2 2018 09 26 17 12 00 -0.2020 100.3180 875.00 845.00 30.00 449482 BKT 2018 08 14 07 00 00 313-99 G co CCGG 92.050 -999.990 ... V2 2018 09 26 16 56 00 -0.2020 100.3180 875.00 845.00 30.00 449481 BKT 2018 08 21 07 00 00 3317-99 G co CCGG 70.220 -999.990 ... V2 2018 09 26 16 40 00 -0.2020 100.3180 875.00 845.00 30.00 449484 BKT 2018 08 21 07 00 00 525-99 G co CCGG 69.880 -999.990 ... V2 2018 09 26 16 24 00 -0.2020 100.3180 875.00 845.00 30.00 449483 BKT 2018 08 28 07 00 00 2630-99 G co CCGG 101.210 -999.990 ... V2 2018 09 26 16 09 00 -0.2020 100.3180 875.00 845.00 30.00 449480 BKT 2018 08 28 07 00 00 460-99 G co CCGG 102.030 -999.990 ... V2 2018 09 26 15 53 00 -0.2020 100.3180 875.00 845.00 30.00 449479 BKT 2018 09 04 07 00 00 1711-99 G co CCGG 100.350 -999.990 ... V2 2018 10 03 16 42 00 -0.2020 100.3180 875.00 845.00 30.00 449743 BKT 2018 09 04 07 00 00 644-99 G co CCGG 99.560 -999.990 ... V2 2018 10 03 16 26 00 -0.2020 100.3180 875.00 845.00 30.00 449742 BKT 2018 09 11 07 00 00 1538-99 G co CCGG 191.880 -999.990 ... V2 2018 10 03 15 54 00 -0.2020 100.3180 875.00 845.00 30.00 449744 BKT 2018 09 11 07 00 00 2585-99 G co CCGG 191.550 -999.990 ... V2 2018 10 03 16 10 00 -0.2020 100.3180 875.00 845.00 30.00 449745 BKT 2018 09 18 07 00 00 135-99 G co CCGG 219.410 -999.990 .X. V2 2018 10 09 11 33 00 -0.2020 100.3180 875.00 845.00 30.00 449877 BKT 2018 09 18 07 00 00 2536-99 G co CCGG 216.590 -999.990 .X. V2 2018 10 09 11 49 00 -0.2020 100.3180 875.00 845.00 30.00 449878 BKT 2018 09 25 07 00 00 1874-99 G co CCGG 142.110 -999.990 ... V2 2018 10 09 12 21 00 -0.2020 100.3180 875.00 845.00 30.00 449880 BKT 2018 09 25 07 00 00 962-99 G co CCGG 142.830 -999.990 ... V2 2018 10 09 12 05 00 -0.2020 100.3180 875.00 845.00 30.00 449879 BKT 2018 10 02 07 00 00 4967-99 G co CCGG 232.090 -999.990 .X. V2 2018 10 23 12 35 00 -0.2020 100.3180 875.00 845.00 30.00 450474 BKT 2018 10 02 07 00 00 5463-99 G co CCGG 233.230 -999.990 .X. V2 2018 10 23 12 51 00 -0.2020 100.3180 875.00 845.00 30.00 450475 BKT 2018 10 09 07 00 00 2740-99 G co CCGG 182.440 -999.990 ... V2 2018 10 19 15 22 00 -0.2020 100.3180 875.00 845.00 30.00 450452 BKT 2018 10 09 07 00 00 5268-99 G co CCGG 180.530 -999.990 ... V2 2018 10 19 15 37 00 -0.2020 100.3180 875.00 845.00 30.00 450453 BKT 2018 10 16 07 00 00 4970-99 G co CCGG 144.720 -999.990 ... V2 2018 11 06 14 46 00 -0.2020 100.3180 875.00 845.00 30.00 451084 BKT 2018 10 16 07 00 00 857-99 G co CCGG 145.090 -999.990 ... V2 2018 11 06 14 31 00 -0.2020 100.3180 875.00 845.00 30.00 451083 BKT 2018 10 23 07 00 00 4881-99 G co CCGG 145.930 -999.990 ... V2 2018 11 06 13 59 00 -0.2020 100.3180 875.00 845.00 30.00 451085 BKT 2018 10 23 07 00 00 5283-99 G co CCGG 146.100 -999.990 ... V2 2018 11 06 14 15 00 -0.2020 100.3180 875.00 845.00 30.00 451086 BKT 2018 10 30 07 00 00 2986-99 G co CCGG 141.470 -999.990 ... V2 2018 11 21 10 19 00 -0.2020 100.3180 875.00 845.00 30.00 451612 BKT 2018 10 30 07 00 00 5523-99 G co CCGG 141.800 -999.990 ... V2 2018 11 21 10 35 00 -0.2020 100.3180 875.00 845.00 30.00 451613 BKT 2018 11 06 07 00 00 4516-99 G co CCGG 119.760 -999.990 ... V2 2018 11 21 10 51 00 -0.2020 100.3180 875.00 845.00 30.00 451614 BKT 2018 11 06 07 00 00 5519-99 G co CCGG 120.310 -999.990 ... V2 2018 11 21 11 07 00 -0.2020 100.3180 875.00 845.00 30.00 451615 BKT 2018 11 13 07 00 00 3944-99 G co CCGG 98.300 -999.990 ... V2 2018 12 10 16 08 00 -0.2020 100.3180 875.00 845.00 30.00 452036 BKT 2018 11 13 07 00 00 594-99 G co CCGG 97.770 -999.990 ... V2 2018 12 10 15 52 00 -0.2020 100.3180 875.00 845.00 30.00 452037 BKT 2018 11 20 07 00 00 4564-99 G co CCGG 113.050 -999.990 ... V2 2018 12 10 15 20 00 -0.2020 100.3180 875.00 845.00 30.00 452034 BKT 2018 11 20 07 00 00 4687-99 G co CCGG 112.950 -999.990 ... V2 2018 12 10 15 36 00 -0.2020 100.3180 875.00 845.00 30.00 452035 BKT 2018 11 27 07 00 00 1287-99 G co CCGG 87.950 -999.990 ... V2 2019 01 15 11 13 00 -0.2020 100.3180 875.00 845.00 30.00 453041 BKT 2018 11 27 07 00 00 1296-99 G co CCGG 87.570 -999.990 ... V2 2019 01 15 11 29 00 -0.2020 100.3180 875.00 845.00 30.00 453042 BKT 2018 12 04 07 00 00 1754-99 G co CCGG 112.570 -999.990 ... V2 2019 01 15 10 57 00 -0.2020 100.3180 875.00 845.00 30.00 453040 BKT 2018 12 04 07 00 00 973-99 G co CCGG 112.830 -999.990 ... V2 2019 01 15 10 41 00 -0.2020 100.3180 875.00 845.00 30.00 453039 BKT 2018 12 11 07 00 00 2146-99 G co CCGG 102.340 -999.990 ... V2 2019 02 05 08 44 00 -0.2020 100.3180 875.00 845.00 30.00 453628 BKT 2018 12 11 07 00 00 4850-99 G co CCGG 100.900 -999.990 ... V2 2019 02 05 09 00 00 -0.2020 100.3180 875.00 845.00 30.00 453629 BKT 2018 12 18 07 00 00 4939-99 G co CCGG 137.880 -999.990 ... V2 2019 02 08 11 51 00 -0.2020 100.3180 875.00 845.00 30.00 453714 BKT 2018 12 25 07 00 00 1662-99 G co CCGG 99.070 -999.990 ... V2 2019 01 31 12 33 00 -0.2020 100.3180 875.00 845.00 30.00 453488 BKT 2018 12 25 07 00 00 2361-99 G co CCGG 99.470 -999.990 ... V2 2019 01 31 12 49 00 -0.2020 100.3180 875.00 845.00 30.00 453489 BKT 2019 01 01 07 00 00 2166-99 G co CCGG 119.900 -999.990 ... V2 2019 01 31 14 08 00 -0.2020 100.3180 875.00 845.00 30.00 453486 BKT 2019 01 01 07 00 00 4186-99 G co CCGG 119.820 -999.990 ... V2 2019 01 31 14 24 00 -0.2020 100.3180 875.00 845.00 30.00 453487 BKT 2019 01 08 07 00 00 1307-99 G co CCGG 141.370 -999.990 ... V2 2019 02 14 13 10 00 -0.2020 100.3180 875.00 845.00 30.00 454054 BKT 2019 01 08 07 00 00 1770-99 G co CCGG 143.890 -999.990 ... V2 2019 02 14 13 26 00 -0.2020 100.3180 875.00 845.00 30.00 454055 BKT 2019 01 15 07 00 00 1981-99 G co CCGG 91.340 -999.990 ... V2 2019 02 14 15 48 00 -0.2020 100.3180 875.00 845.00 30.00 454052 BKT 2019 01 15 07 00 00 4395-99 G co CCGG 90.480 -999.990 ... V2 2019 02 14 16 04 00 -0.2020 100.3180 875.00 845.00 30.00 454053 BKT 2019 01 22 07 00 00 1660-99 G co CCGG 88.810 -999.990 ... V2 2019 02 25 14 27 00 -0.2020 100.3180 875.00 845.00 30.00 454419 BKT 2019 01 22 07 00 00 2281-99 G co CCGG 88.360 -999.990 ... V2 2019 02 25 14 43 00 -0.2020 100.3180 875.00 845.00 30.00 454420 BKT 2019 01 29 07 00 00 1961-99 G co CCGG 144.990 -999.990 ... V2 2019 02 25 14 59 00 -0.2020 100.3180 875.00 845.00 30.00 454417 BKT 2019 01 29 07 00 00 5553-99 G co CCGG 148.060 -999.990 ... V2 2019 02 25 15 15 00 -0.2020 100.3180 875.00 845.00 30.00 454418 BKT 2019 02 05 07 00 00 682-99 G co CCGG 154.970 -999.990 ... V2 2019 03 18 14 39 00 -0.2020 100.3180 875.00 845.00 30.00 454885 BKT 2019 02 12 07 00 00 1474-99 G co CCGG 164.500 -999.990 ... V2 2019 03 04 15 38 00 -0.2020 100.3180 875.00 845.00 30.00 454886 BKT 2019 02 12 07 00 00 4338-99 G co CCGG 168.510 -999.990 ... V2 2019 03 04 15 54 00 -0.2020 100.3180 875.00 845.00 30.00 454887 BKT 2019 02 19 07 00 00 2283-99 G co CCGG 137.050 -999.990 ... V2 2019 03 12 14 07 00 -0.2020 100.3180 875.00 845.00 30.00 455563 BKT 2019 02 19 07 00 00 3895-99 G co CCGG 137.010 -999.990 ... V2 2019 03 12 14 23 00 -0.2020 100.3180 875.00 845.00 30.00 455564 BKT 2019 02 26 07 00 00 2670-99 G co CCGG 193.150 -999.990 ... V2 2019 03 12 11 29 00 -0.2020 100.3180 875.00 845.00 30.00 455565 BKT 2019 02 26 07 00 00 4913-99 G co CCGG 194.250 -999.990 ... V2 2019 03 12 11 45 00 -0.2020 100.3180 875.00 845.00 30.00 455566 BKT 2019 03 05 07 00 00 3808-99 G co CCGG 118.770 -999.990 ... V2 2019 04 02 15 16 00 -0.2020 100.3180 875.00 845.00 30.00 456330 BKT 2019 03 05 07 00 00 4129-99 G co CCGG 117.780 -999.990 ... V2 2019 04 02 15 31 00 -0.2020 100.3180 875.00 845.00 30.00 456331 BKT 2019 03 12 07 00 00 4198-99 G co CCGG 93.480 -999.990 ... V2 2019 04 02 16 03 00 -0.2020 100.3180 875.00 845.00 30.00 456333 BKT 2019 03 12 07 00 00 570-99 G co CCGG 93.320 -999.990 ... V2 2019 04 02 15 47 00 -0.2020 100.3180 875.00 845.00 30.00 456332 BKT 2019 03 19 07 00 00 1540-99 G co CCGG 275.260 -999.990 .X. V2 2019 04 10 11 51 00 -0.2020 100.3180 875.00 845.00 30.00 456703 BKT 2019 03 19 07 00 00 3235-99 G co CCGG 276.650 -999.990 .X. V2 2019 04 10 12 07 00 -0.2020 100.3180 875.00 845.00 30.00 456704 BKT 2019 03 26 07 00 00 1047-99 G co CCGG 186.960 -999.990 ... V2 2019 04 10 11 20 00 -0.2020 100.3180 875.00 845.00 30.00 456705 BKT 2019 03 26 07 00 00 3709-99 G co CCGG 184.430 -999.990 ... V2 2019 04 10 11 35 00 -0.2020 100.3180 875.00 845.00 30.00 456706 BKT 2019 04 02 07 00 00 429-99 G co CCGG 114.790 -999.990 ... V2 2019 05 10 10 54 00 -0.2020 100.3180 875.00 845.00 30.00 457869 BKT 2019 04 02 07 00 00 4697-99 G co CCGG 113.780 -999.990 ... V2 2019 05 10 11 10 00 -0.2020 100.3180 875.00 845.00 30.00 457870 BKT 2019 04 09 07 00 00 1217-99 G co CCGG 128.950 -999.990 ... V2 2019 05 10 10 37 00 -0.2020 100.3180 875.00 845.00 30.00 457871 BKT 2019 04 09 07 00 00 5256-99 G co CCGG 128.190 -999.990 ... V2 2019 05 10 10 21 00 -0.2020 100.3180 875.00 845.00 30.00 457872 BKT 2019 04 16 07 00 00 4518-99 G co CCGG 166.360 -999.990 ... V2 2019 05 23 15 43 00 -0.2020 100.3180 875.00 845.00 30.00 458924 BKT 2019 04 16 07 00 00 5780-99 G co CCGG 167.430 -999.990 ... V2 2019 05 23 15 59 00 -0.2020 100.3180 875.00 845.00 30.00 458925 BKT 2019 04 23 07 00 00 2385-99 G co CCGG 139.820 -999.990 ... V2 2019 05 23 16 30 00 -0.2020 100.3180 875.00 845.00 30.00 458926 BKT 2019 04 23 07 00 00 702-99 G co CCGG 139.600 -999.990 ... V2 2019 05 23 16 15 00 -0.2020 100.3180 875.00 845.00 30.00 458927 BKT 2019 04 30 07 00 00 4634-99 G co CCGG 119.920 -999.990 ... V2 2019 06 12 09 23 00 -0.2020 100.3180 875.00 845.00 30.00 459439 BKT 2019 04 30 07 00 00 4860-99 G co CCGG 120.820 -999.990 ... V2 2019 06 12 09 38 00 -0.2020 100.3180 875.00 845.00 30.00 459440 BKT 2019 05 07 07 00 00 354-99 G co CCGG 81.940 -999.990 ... V2 2019 06 12 09 54 00 -0.2020 100.3180 875.00 845.00 30.00 459437 BKT 2019 05 07 07 00 00 5126-99 G co CCGG 81.720 -999.990 ... V2 2019 06 12 10 10 00 -0.2020 100.3180 875.00 845.00 30.00 459438 BKT 2019 05 14 07 00 00 2596-99 G co CCGG 148.730 -999.990 ... V2 2019 06 27 09 51 00 -0.2020 100.3180 875.00 845.00 30.00 460146 BKT 2019 05 14 07 00 00 2989-99 G co CCGG 149.700 -999.990 ... V2 2019 06 27 10 07 00 -0.2020 100.3180 875.00 845.00 30.00 460147 BKT 2019 05 21 07 00 00 1866-99 G co CCGG 130.740 -999.990 ... V2 2019 06 26 17 42 00 -0.2020 100.3180 875.00 845.00 30.00 460144 BKT 2019 05 21 07 00 00 4280-99 G co CCGG 131.290 -999.990 ... V2 2019 06 26 17 58 00 -0.2020 100.3180 875.00 845.00 30.00 460145 BKT 2019 05 28 07 00 00 2720-99 G co CCGG 163.070 -999.990 ... V2 2019 07 19 11 26 00 -0.2020 100.3180 875.00 845.00 30.00 461330 BKT 2019 05 28 07 00 00 4885-99 G co CCGG 163.470 -999.990 ... V2 2019 07 19 11 42 00 -0.2020 100.3180 875.00 845.00 30.00 461331 BKT 2019 06 04 07 00 00 1395-99 G co CCGG 142.800 -999.990 ... V2 2019 07 17 10 47 00 -0.2020 100.3180 875.00 845.00 30.00 461171 BKT 2019 06 04 07 00 00 3739-99 G co CCGG 140.730 -999.990 ... V2 2019 07 17 11 03 00 -0.2020 100.3180 875.00 845.00 30.00 461172 BKT 2019 06 11 07 00 00 3334-99 G co CCGG 130.670 -999.990 ... V2 2019 07 15 15 50 00 -0.2020 100.3180 875.00 845.00 30.00 461060 BKT 2019 06 11 07 00 00 4092-99 G co CCGG 132.310 -999.990 ... V2 2019 07 15 16 06 00 -0.2020 100.3180 875.00 845.00 30.00 461061 BKT 2019 06 18 07 00 00 217-99 G co CCGG 147.180 -999.990 ... V2 2019 07 09 12 27 00 -0.2020 100.3180 875.00 845.00 30.00 460909 BKT 2019 06 18 07 00 00 5632-99 G co CCGG 146.800 -999.990 ... V2 2019 07 09 12 43 00 -0.2020 100.3180 875.00 845.00 30.00 460908 BKT 2019 06 25 07 00 00 2789-99 G co CCGG 70.610 -999.990 ... V2 2019 08 05 15 47 00 -0.2020 100.3180 875.00 845.00 30.00 462068 BKT 2019 06 25 07 00 00 956-99 G co CCGG 70.010 -999.990 ... V2 2019 08 05 15 32 00 -0.2020 100.3180 875.00 845.00 30.00 462067 BKT 2019 07 02 07 00 00 1399-99 G co CCGG 88.060 -999.990 ... V2 2019 08 05 15 00 00 -0.2020 100.3180 875.00 845.00 30.00 462065 BKT 2019 07 02 07 00 00 5421-99 G co CCGG 87.820 -999.990 ... V2 2019 08 05 15 16 00 -0.2020 100.3180 875.00 845.00 30.00 462066 BKT 2019 07 09 01 00 00 3043-99 G co CCGG 105.630 -999.990 ... AR2 2019 08 22 14 19 41 -0.2020 100.3180 875.00 845.00 30.00 463545 BKT 2019 07 09 01 00 00 5373-99 G co CCGG 104.810 -999.990 ... AR2 2019 08 22 14 33 57 -0.2020 100.3180 875.00 845.00 30.00 463546 BKT 2019 07 16 07 00 00 2320-99 G co CCGG 137.010 -999.990 ... AR2 2019 08 22 14 48 16 -0.2020 100.3180 875.00 845.00 30.00 463547 BKT 2019 07 16 07 00 00 4389-99 G co CCGG 136.790 -999.990 ... AR2 2019 08 22 15 02 33 -0.2020 100.3180 875.00 845.00 30.00 463548 BKT 2019 07 23 07 00 00 135-99 G co CCGG 171.940 -999.990 ... AR2 2019 08 20 13 06 03 -0.2020 100.3180 875.00 845.00 30.00 463436 BKT 2019 07 23 07 00 00 77-99 G co CCGG 171.580 -999.990 ... AR2 2019 08 20 12 51 47 -0.2020 100.3180 875.00 845.00 30.00 463435 BKT 2019 07 30 07 00 00 4087-99 G co CCGG 140.770 -999.990 ... AR2 2019 08 20 13 34 38 -0.2020 100.3180 875.00 845.00 30.00 463438 BKT 2019 07 30 07 00 00 496-99 G co CCGG 140.980 -999.990 ... AR2 2019 08 20 13 20 22 -0.2020 100.3180 875.00 845.00 30.00 463437 BKT 2019 08 06 07 00 00 1167-99 G co CCGG 135.540 -999.990 N.. AR2 2019 08 28 13 15 44 -0.2020 100.3180 875.00 845.00 30.00 463755 BKT 2019 08 06 07 00 00 244-99 G co CCGG 140.640 -999.990 N.. AR2 2019 08 28 13 01 22 -0.2020 100.3180 875.00 845.00 30.00 463756 BKT 2019 08 13 07 00 00 4809-99 G co CCGG 97.070 -999.990 ... AR2 2019 08 27 14 32 21 -0.2020 100.3180 875.00 845.00 30.00 463759 BKT 2019 08 13 07 00 00 4914-99 G co CCGG 97.360 -999.990 ... AR2 2019 08 27 14 46 45 -0.2020 100.3180 875.00 845.00 30.00 463760 BKT 2019 08 20 07 00 00 1806-99 G co CCGG 243.970 -999.990 .X. AR2 2019 11 07 10 34 34 -0.2020 100.3180 875.00 845.00 30.00 466514 BKT 2019 08 20 07 00 00 557-99 G co CCGG 243.310 -999.990 .X. AR2 2019 11 07 10 20 13 -0.2020 100.3180 875.00 845.00 30.00 466513 BKT 2019 08 27 07 00 00 4634-99 G co CCGG 130.820 -999.990 ... AR2 2019 11 07 10 48 51 -0.2020 100.3180 875.00 845.00 30.00 466515 BKT 2019 08 27 07 00 00 4661-99 G co CCGG 131.000 -999.990 ... AR2 2019 11 07 11 03 10 -0.2020 100.3180 875.00 845.00 30.00 466516 BKT 2019 09 03 07 00 00 876-99 G co CCGG 224.880 -999.990 ... AR2 2019 11 07 10 05 55 -0.2020 100.3180 875.00 845.00 30.00 466510 BKT 2019 09 03 07 00 00 91-99 G co CCGG 228.660 -999.990 ... AR2 2019 11 07 09 51 38 -0.2020 100.3180 875.00 845.00 30.00 466509 BKT 2019 09 10 07 00 00 1411-99 G co CCGG 192.440 -999.990 ... AR2 2019 11 07 09 23 03 -0.2020 100.3180 875.00 845.00 30.00 466511 BKT 2019 09 10 07 00 00 2834-99 G co CCGG 193.990 -999.990 ... AR2 2019 11 07 09 37 20 -0.2020 100.3180 875.00 845.00 30.00 466512 BKT 2019 09 17 07 00 00 2307-99 G co CCGG 461.720 -999.990 .X. AR2 2019 11 07 11 46 12 -0.2020 100.3180 875.00 845.00 30.00 466503 BKT 2019 09 17 07 00 00 5128-99 G co CCGG 459.750 -999.990 .X. AR2 2019 11 07 12 00 31 -0.2020 100.3180 875.00 845.00 30.00 466504 BKT 2019 09 24 07 00 00 409-99 G co CCGG 575.260 -999.990 .XC AR2 2019 11 07 11 17 35 -0.2020 100.3180 875.00 845.00 30.00 466501 BKT 2019 09 24 07 00 00 4984-99 G co CCGG 575.110 -999.990 .XC AR2 2019 11 07 11 31 53 -0.2020 100.3180 875.00 845.00 30.00 466502 BKT 2019 10 01 07 00 00 4298-99 G co CCGG 280.470 -999.990 .X. AR2 2019 11 20 13 22 07 -0.2020 100.3180 875.00 845.00 30.00 467485 BKT 2019 10 01 07 00 00 4695-99 G co CCGG 279.680 -999.990 .X. AR2 2019 11 20 13 36 26 -0.2020 100.3180 875.00 845.00 30.00 467486 BKT 2019 10 08 07 00 00 2365-99 G co CCGG 262.050 -999.990 .X. AR2 2019 11 20 13 07 48 -0.2020 100.3180 875.00 845.00 30.00 467483 BKT 2019 10 08 07 00 00 861-99 G co CCGG 260.910 -999.990 .X. AR2 2019 11 20 12 53 29 -0.2020 100.3180 875.00 845.00 30.00 467484 BKT 2019 10 15 07 00 00 2185-99 G co CCGG 565.480 -999.990 N.. AR2 2019 11 20 12 10 46 -0.2020 100.3180 875.00 845.00 30.00 467480 BKT 2019 10 15 07 00 00 909-99 G co CCGG 572.120 -999.990 N.. AR2 2019 11 20 11 56 25 -0.2020 100.3180 875.00 845.00 30.00 467479 BKT 2019 10 22 07 00 00 5571-99 G co CCGG 302.790 -999.990 .X. AR2 2019 11 20 11 42 08 -0.2020 100.3180 875.00 845.00 30.00 467482 BKT 2019 10 22 07 00 00 864-99 G co CCGG 302.200 -999.990 .X. AR2 2019 11 20 11 27 50 -0.2020 100.3180 875.00 845.00 30.00 467481 BKT 2019 10 29 07 00 00 1023-99 G co CCGG 299.370 -999.990 .X. AR2 2019 12 06 13 28 24 -0.2020 100.3180 875.00 845.00 30.00 467852 BKT 2019 10 29 07 00 00 4737-99 G co CCGG 300.500 -999.990 .X. AR2 2019 12 06 13 42 44 -0.2020 100.3180 875.00 845.00 30.00 467853 BKT 2019 11 05 07 00 00 1762-99 G co CCGG 121.220 -999.990 ... AR2 2019 12 06 13 57 04 -0.2020 100.3180 875.00 845.00 30.00 467851 BKT 2019 11 05 07 00 00 4980-99 G co CCGG 120.550 -999.990 ... AR2 2019 12 06 14 11 24 -0.2020 100.3180 875.00 845.00 30.00 467850 BKT 2019 11 12 07 00 00 2131-99 G co CCGG 271.000 -999.990 .X. AR2 2020 01 30 11 19 10 -0.2020 100.3180 875.00 845.00 30.00 469522 BKT 2019 11 12 07 00 00 745-99 G co CCGG 271.090 -999.990 .X. AR2 2020 01 30 11 04 50 -0.2020 100.3180 875.00 845.00 30.00 469521 BKT 2019 11 19 07 00 00 2146-99 G co CCGG 151.360 -999.990 ... AR2 2020 01 30 10 36 10 -0.2020 100.3180 875.00 845.00 30.00 469519 BKT 2019 11 19 07 00 00 4850-99 G co CCGG 151.320 -999.990 ... AR2 2020 01 30 10 50 30 -0.2020 100.3180 875.00 845.00 30.00 469520 BKT 2019 11 26 07 00 00 4484-99 G co CCGG 138.730 -999.990 ... AR2 2020 01 30 10 07 30 -0.2020 100.3180 875.00 845.00 30.00 469515 BKT 2019 11 26 07 00 00 4888-99 G co CCGG 138.180 -999.990 ... AR2 2020 01 30 10 21 50 -0.2020 100.3180 875.00 845.00 30.00 469516 BKT 2019 12 03 07 00 00 3639-99 G co CCGG 127.350 -999.990 ... AR2 2020 01 29 16 31 27 -0.2020 100.3180 875.00 845.00 30.00 469517 BKT 2019 12 03 07 00 00 4297-99 G co CCGG 127.800 -999.990 ... AR2 2020 01 29 16 45 49 -0.2020 100.3180 875.00 845.00 30.00 469518 BKT 2019 12 10 07 30 00 285-99 G co CCGG 149.200 -999.990 ... AR2 2020 02 06 09 48 17 -0.2020 100.3180 875.00 845.00 30.00 469807 BKT 2019 12 10 07 30 00 363-99 G co CCGG 152.270 -999.990 ... AR2 2020 02 06 10 02 36 -0.2020 100.3180 875.00 845.00 30.00 469808 BKT 2019 12 17 07 00 00 3209-99 G co CCGG 114.970 -999.990 ... AR2 2020 02 06 10 16 55 -0.2020 100.3180 875.00 845.00 30.00 469805 BKT 2019 12 17 07 00 00 4309-99 G co CCGG 115.490 -999.990 ... AR2 2020 02 06 10 31 18 -0.2020 100.3180 875.00 845.00 30.00 469806 BKT 2019 12 24 07 00 00 1306-99 G co CCGG 131.170 -999.990 ... AR2 2020 02 06 10 59 58 -0.2020 100.3180 875.00 845.00 30.00 469810 BKT 2019 12 24 07 00 00 441-99 G co CCGG 130.590 -999.990 ... AR2 2020 02 06 10 45 38 -0.2020 100.3180 875.00 845.00 30.00 469809 BKT 2019 12 31 07 00 00 340-99 G co CCGG 180.050 -999.990 ... AR2 2020 01 31 14 26 42 -0.2020 100.3180 875.00 845.00 30.00 469619 BKT 2019 12 31 07 00 00 3773-99 G co CCGG 180.580 -999.990 ... AR2 2020 01 31 14 41 02 -0.2020 100.3180 875.00 845.00 30.00 469620 BKT 2020 01 07 07 00 00 2248-99 G co CCGG 147.110 -999.990 ... AR2 2020 03 09 11 40 44 -0.2020 100.3180 875.00 845.00 30.00 471413 BKT 2020 01 07 07 00 00 345-99 G co CCGG 147.270 -999.990 ... AR2 2020 03 09 11 26 24 -0.2020 100.3180 875.00 845.00 30.00 471412 BKT 2020 02 04 07 00 00 3160-99 G co CCGG 201.650 -999.990 ... AR2 2020 03 31 14 18 45 -0.2020 100.3180 875.00 845.00 30.00 472244 BKT 2020 02 04 07 00 00 3792-99 G co CCGG 201.200 -999.990 ... AR2 2020 03 31 14 33 04 -0.2020 100.3180 875.00 845.00 30.00 472245 BKT 2020 02 11 07 00 00 1164-99 G co CCGG 173.720 -999.990 ... AR2 2020 03 31 11 55 09 -0.2020 100.3180 875.00 845.00 30.00 472178 BKT 2020 02 11 07 00 00 3426-99 G co CCGG 172.720 -999.990 ... AR2 2020 03 31 12 09 33 -0.2020 100.3180 875.00 845.00 30.00 472179 BKT 2020 02 18 07 00 00 1618-99 G co CCGG 158.610 -999.990 ... AR2 2020 03 26 16 33 29 -0.2020 100.3180 875.00 845.00 30.00 472103 BKT 2020 02 18 07 00 00 828-99 G co CCGG 158.280 -999.990 ... AR2 2020 03 26 16 19 08 -0.2020 100.3180 875.00 845.00 30.00 472102 BKT 2020 02 25 07 00 00 1579-99 G co CCGG 151.400 -999.990 ... AR2 2020 03 27 09 37 13 -0.2020 100.3180 875.00 845.00 30.00 472105 BKT 2020 02 25 07 00 00 704-99 G co CCGG 151.200 -999.990 ... AR2 2020 03 27 09 22 52 -0.2020 100.3180 875.00 845.00 30.00 472104 BKT 2020 03 03 07 00 00 1317-99 G co CCGG 316.180 -999.990 .X. AR2 2020 04 03 12 57 07 -0.2020 100.3180 875.00 845.00 30.00 472581 BKT 2020 03 03 07 00 00 565-99 G co CCGG 317.310 -999.990 .X. AR2 2020 04 03 12 42 49 -0.2020 100.3180 875.00 845.00 30.00 472580 BKT 2020 03 10 07 00 00 1897-99 G co CCGG 137.330 -999.990 ... AR2 2020 04 03 13 11 26 -0.2020 100.3180 875.00 845.00 30.00 472582 BKT 2020 03 10 07 00 00 4628-99 G co CCGG 135.920 -999.990 ... AR2 2020 04 03 13 25 45 -0.2020 100.3180 875.00 845.00 30.00 472583 BKT 2020 03 17 07 00 00 1689-99 G co CCGG 151.100 -999.990 ... AR2 2020 04 24 10 08 18 -0.2020 100.3180 875.00 845.00 30.00 473358 BKT 2020 03 17 07 00 00 2981-99 G co CCGG 150.770 -999.990 ... AR2 2020 04 24 10 22 35 -0.2020 100.3180 875.00 845.00 30.00 473359 BKT 2020 03 24 07 00 00 3747-99 G co CCGG 152.940 -999.990 ... AR2 2020 04 21 15 42 40 -0.2020 100.3180 875.00 845.00 30.00 473357 BKT 2020 03 24 07 00 00 809-99 G co CCGG 153.540 -999.990 ... AR2 2020 04 21 15 28 20 -0.2020 100.3180 875.00 845.00 30.00 473356 BKT 2020 03 31 07 00 00 5665-99 G co CCGG 121.250 -999.990 ... AR2 2020 04 21 14 45 20 -0.2020 100.3180 875.00 845.00 30.00 473355 BKT 2020 03 31 07 00 00 747-99 G co CCGG 121.890 -999.990 ... AR2 2020 04 21 14 31 01 -0.2020 100.3180 875.00 845.00 30.00 473354 BKT 2020 04 07 07 00 00 1593-99 G co CCGG 97.650 -999.990 ... AR2 2020 04 21 14 59 39 -0.2020 100.3180 875.00 845.00 30.00 473352 BKT 2020 04 07 07 00 00 2366-99 G co CCGG 97.610 -999.990 ... AR2 2020 04 21 15 13 59 -0.2020 100.3180 875.00 845.00 30.00 473353 BKT 2020 04 14 07 00 00 1405-99 G co CCGG 128.430 -999.990 ... AR2 2020 05 12 10 30 13 -0.2020 100.3180 875.00 845.00 30.00 474150 BKT 2020 04 14 07 00 00 2354-99 G co CCGG 128.490 -999.990 ... AR2 2020 05 12 10 44 35 -0.2020 100.3180 875.00 845.00 30.00 474151 BKT 2020 04 21 07 00 00 4317-99 G co CCGG 147.360 -999.990 ... AR2 2020 05 07 12 20 02 -0.2020 100.3180 875.00 845.00 30.00 474148 BKT 2020 04 21 07 00 00 4950-99 G co CCGG 147.290 -999.990 ... AR2 2020 05 07 12 34 22 -0.2020 100.3180 875.00 845.00 30.00 474149 BKT 2020 04 28 07 00 00 1205-99 G co CCGG 106.210 -999.990 ... AR2 2020 06 18 16 54 00 -0.2020 100.3180 875.00 845.00 30.00 475685 BKT 2020 04 28 07 00 00 1868-99 G co CCGG 105.970 -999.990 ... AR2 2020 06 18 17 08 23 -0.2020 100.3180 875.00 845.00 30.00 475686 BKT 2020 05 05 07 00 00 4608-99 G co CCGG 95.120 -999.990 ... AR2 2020 06 18 17 37 06 -0.2020 100.3180 875.00 845.00 30.00 475684 BKT 2020 05 05 07 00 00 461-99 G co CCGG 93.880 -999.990 ... AR2 2020 06 18 17 22 46 -0.2020 100.3180 875.00 845.00 30.00 475683 BKT 2020 05 12 07 00 00 45-99 G co CCGG 132.980 -999.990 ... AR2 2020 06 22 12 56 40 -0.2020 100.3180 875.00 845.00 30.00 475703 BKT 2020 05 12 07 00 00 587-99 G co CCGG 134.110 -999.990 ... AR2 2020 06 22 13 11 02 -0.2020 100.3180 875.00 845.00 30.00 475704 BKT 2020 05 19 07 00 00 1505-99 G co CCGG 83.270 -999.990 ... AR2 2020 06 22 13 25 24 -0.2020 100.3180 875.00 845.00 30.00 475705 BKT 2020 05 19 07 00 00 3072-99 G co CCGG 82.960 -999.990 ... AR2 2020 06 22 13 39 46 -0.2020 100.3180 875.00 845.00 30.00 475706 BKT 2020 05 26 07 00 00 5359-99 G co CCGG 72.100 -999.990 ... AR2 2020 07 13 13 40 46 -0.2020 100.3180 875.00 845.00 30.00 476868 BKT 2020 05 26 07 00 00 5826-99 G co CCGG 71.940 -999.990 ... AR2 2020 07 13 13 55 07 -0.2020 100.3180 875.00 845.00 30.00 476869 BKT 2020 06 02 07 00 00 1879-99 G co CCGG 132.640 -999.990 ... AR2 2020 07 13 13 12 01 -0.2020 100.3180 875.00 845.00 30.00 476870 BKT 2020 06 02 07 00 00 3300-99 G co CCGG 132.620 -999.990 ... AR2 2020 07 13 13 26 25 -0.2020 100.3180 875.00 845.00 30.00 476871 BKT 2020 06 09 07 00 00 2300-99 G co CCGG 79.890 -999.990 ... AR2 2020 07 21 08 30 19 -0.2020 100.3180 875.00 845.00 30.00 476834 BKT 2020 06 09 07 00 00 2631-99 G co CCGG 79.300 -999.990 ... AR2 2020 07 21 08 44 45 -0.2020 100.3180 875.00 845.00 30.00 476835 BKT 2020 06 16 07 00 00 181-99 G co CCGG 142.360 -999.990 ... AR2 2020 07 21 08 59 10 -0.2020 100.3180 875.00 845.00 30.00 476836 BKT 2020 06 16 07 00 00 381-99 G co CCGG 141.530 -999.990 ... AR2 2020 07 21 09 13 35 -0.2020 100.3180 875.00 845.00 30.00 476837 BKT 2020 06 23 07 00 00 2491-99 G co CCGG 82.860 -999.990 ... AR2 2020 07 23 12 12 07 -0.2020 100.3180 875.00 845.00 30.00 477431 BKT 2020 06 23 07 00 00 5872-99 G co CCGG 83.020 -999.990 ... AR2 2020 07 23 12 26 33 -0.2020 100.3180 875.00 845.00 30.00 477432 BKT 2020 06 30 07 00 00 3120-99 G co CCGG 197.370 -999.990 .X. AR2 2020 07 23 12 40 57 -0.2020 100.3180 875.00 845.00 30.00 477429 BKT 2020 06 30 07 00 00 3407-99 G co CCGG 197.560 -999.990 .X. AR2 2020 07 23 12 55 20 -0.2020 100.3180 875.00 845.00 30.00 477430 BKT 2020 07 07 07 00 00 1631-99 G co CCGG 113.090 -999.990 ... AR2 2020 08 05 12 12 35 -0.2020 100.3180 875.00 845.00 30.00 477998 BKT 2020 07 07 07 00 00 5775-99 G co CCGG 113.140 -999.990 ... AR2 2020 08 05 12 26 56 -0.2020 100.3180 875.00 845.00 30.00 477999 BKT 2020 07 14 07 00 00 377-99 G co CCGG 134.680 -999.990 ... AR2 2020 08 06 14 06 19 -0.2020 100.3180 875.00 845.00 30.00 478116 BKT 2020 07 14 07 00 00 586-99 G co CCGG 135.500 -999.990 ... AR2 2020 08 06 14 20 38 -0.2020 100.3180 875.00 845.00 30.00 478117 BKT 2020 07 21 07 00 00 4325-99 G co CCGG 101.170 -999.990 ... AR2 2020 08 20 13 59 00 -0.2020 100.3180 875.00 845.00 30.00 478936 BKT 2020 07 21 07 00 00 968-99 G co CCGG 101.110 -999.990 ... AR2 2020 08 20 13 44 35 -0.2020 100.3180 875.00 845.00 30.00 478935 BKT 2020 07 28 07 00 00 312-99 G co CCGG 120.210 -999.990 ... AR2 2020 08 20 13 15 47 -0.2020 100.3180 875.00 845.00 30.00 478937 BKT 2020 07 28 07 00 00 5592-99 G co CCGG 120.080 -999.990 ... AR2 2020 08 20 13 30 12 -0.2020 100.3180 875.00 845.00 30.00 478938 BKT 2020 08 04 07 00 00 1074-99 G co CCGG 80.820 -999.990 ... AR2 2020 09 15 13 57 47 -0.2020 100.3180 875.00 845.00 30.00 479555 BKT 2020 08 04 07 00 00 695-99 G co CCGG 79.760 -999.990 ... AR2 2020 09 15 13 43 21 -0.2020 100.3180 875.00 845.00 30.00 479556 BKT 2020 08 11 07 00 00 4036-99 G co CCGG 129.410 -999.990 ... AR2 2020 09 15 14 12 11 -0.2020 100.3180 875.00 845.00 30.00 479557 BKT 2020 08 11 07 00 00 4301-99 G co CCGG 128.730 -999.990 ... AR2 2020 09 15 14 26 33 -0.2020 100.3180 875.00 845.00 30.00 479558 BKT 2020 08 18 07 00 00 4230-99 G co CCGG 117.730 -999.990 ... AR2 2020 10 02 13 52 48 -0.2020 100.3180 875.00 845.00 30.00 480465 BKT 2020 08 18 07 00 00 490-99 G co CCGG 118.050 -999.990 ... AR2 2020 10 02 13 38 32 -0.2020 100.3180 875.00 845.00 30.00 480466 BKT 2020 08 25 07 00 00 3737-99 G co CCGG 143.950 -999.990 ... AR2 2020 10 02 12 55 44 -0.2020 100.3180 875.00 845.00 30.00 480463 BKT 2020 08 25 07 00 00 781-99 G co CCGG 144.450 -999.990 ... AR2 2020 10 02 12 41 26 -0.2020 100.3180 875.00 845.00 30.00 480464 BKT 2020 09 01 07 00 00 2840-99 G co CCGG 105.630 -999.990 ... AR2 2020 10 01 16 04 39 -0.2020 100.3180 875.00 845.00 30.00 480228 BKT 2020 09 01 07 00 00 5513-99 G co CCGG 105.440 -999.990 ... AR2 2020 10 01 16 18 56 -0.2020 100.3180 875.00 845.00 30.00 480229 BKT 2020 09 08 07 00 00 1930-99 G co CCGG 146.220 -999.990 ... AR2 2020 10 01 16 33 15 -0.2020 100.3180 875.00 845.00 30.00 480226 BKT 2020 09 08 07 00 00 5119-99 G co CCGG 146.080 -999.990 ... AR2 2020 10 01 16 47 32 -0.2020 100.3180 875.00 845.00 30.00 480227 BKT 2020 09 15 07 00 00 3121-99 G co CCGG 106.720 -999.990 ... AR2 2020 11 03 13 18 37 -0.2020 100.3180 875.00 845.00 30.00 481280 BKT 2020 09 15 07 00 00 979-99 G co CCGG 107.100 -999.990 ... AR2 2020 11 03 13 04 21 -0.2020 100.3180 875.00 845.00 30.00 481279 BKT 2020 09 22 07 00 00 100-99 G co CCGG 101.430 -999.990 ... AR2 2020 11 03 13 32 53 -0.2020 100.3180 875.00 845.00 30.00 481281 BKT 2020 09 22 07 00 00 2521-99 G co CCGG 101.080 -999.990 ... AR2 2020 11 03 13 47 09 -0.2020 100.3180 875.00 845.00 30.00 481282 BKT 2020 09 29 07 00 00 2759-99 G co CCGG 132.650 -999.990 ... AR2 2020 10 30 13 52 54 -0.2020 100.3180 875.00 845.00 30.00 481536 BKT 2020 09 29 07 00 00 2882-99 G co CCGG 134.370 -999.990 ... AR2 2020 10 30 14 07 14 -0.2020 100.3180 875.00 845.00 30.00 481537 BKT 2020 10 06 07 00 00 1760-99 G co CCGG 76.810 -999.990 ... AR2 2020 10 30 14 35 52 -0.2020 100.3180 875.00 845.00 30.00 481535 BKT 2020 10 06 07 00 00 433-99 G co CCGG 76.640 -999.990 ... AR2 2020 10 30 14 21 34 -0.2020 100.3180 875.00 845.00 30.00 481534 BKT 2020 10 13 07 00 00 1732-99 G co CCGG 114.200 -999.990 ... AR2 2020 11 20 15 21 17 -0.2020 100.3180 875.00 845.00 30.00 482337 BKT 2020 10 13 07 00 00 5042-99 G co CCGG 114.360 -999.990 ... AR2 2020 11 20 15 35 34 -0.2020 100.3180 875.00 845.00 30.00 482338 BKT 2020 10 20 07 00 00 1296-99 G co CCGG 133.910 -999.990 ... AR2 2020 11 20 15 49 52 -0.2020 100.3180 875.00 845.00 30.00 482335 BKT 2020 10 20 07 00 00 5611-99 G co CCGG 135.340 -999.990 ... AR2 2020 11 20 16 04 09 -0.2020 100.3180 875.00 845.00 30.00 482336 BKT 2020 10 27 07 00 00 1844-99 G co CCGG 98.690 -999.990 ... AR2 2021 01 12 13 58 49 -0.2020 100.3180 875.00 845.00 30.00 484374 BKT 2020 10 27 07 00 00 531-99 G co CCGG 97.360 -999.990 ... AR2 2021 01 12 13 44 28 -0.2020 100.3180 875.00 845.00 30.00 484373 BKT 2020 11 03 07 00 00 645-99 G co CCGG 121.400 -999.990 ... AR2 2021 01 12 13 15 50 -0.2020 100.3180 875.00 845.00 30.00 484375 BKT 2020 11 03 07 00 00 970-99 G co CCGG 121.730 -999.990 ... AR2 2021 01 12 13 30 08 -0.2020 100.3180 875.00 845.00 30.00 484376 BKT 2020 11 10 07 00 00 1141-99 G co CCGG 104.650 -999.990 ... AR2 2021 01 12 12 47 16 -0.2020 100.3180 875.00 845.00 30.00 484369 BKT 2020 11 10 07 00 00 4255-99 G co CCGG 104.280 -999.990 ... AR2 2021 01 12 13 01 33 -0.2020 100.3180 875.00 845.00 30.00 484370 BKT 2020 11 17 07 00 00 2111-99 G co CCGG 110.530 -999.990 ... AR2 2021 01 12 12 18 35 -0.2020 100.3180 875.00 845.00 30.00 484371 BKT 2020 11 17 07 00 00 5320-99 G co CCGG 110.970 -999.990 ... AR2 2021 01 12 12 32 54 -0.2020 100.3180 875.00 845.00 30.00 484372 BKT 2020 11 24 07 00 00 3609-99 G co CCGG 106.180 -999.990 ... AR2 2021 01 11 14 48 41 -0.2020 100.3180 875.00 845.00 30.00 484357 BKT 2020 11 24 07 00 00 5134-99 G co CCGG 105.830 -999.990 ... AR2 2021 01 11 15 02 58 -0.2020 100.3180 875.00 845.00 30.00 484358 BKT 2020 12 01 07 00 00 1858-99 G co CCGG 112.790 -999.990 ... AR2 2021 01 11 15 17 16 -0.2020 100.3180 875.00 845.00 30.00 484359 BKT 2020 12 01 07 00 00 3267-99 G co CCGG 112.550 -999.990 ... AR2 2021 01 11 15 31 36 -0.2020 100.3180 875.00 845.00 30.00 484360 BKT 2020 12 08 07 00 00 3800-99 G co CCGG 132.830 -999.990 ... AR2 2021 01 11 16 14 31 -0.2020 100.3180 875.00 845.00 30.00 484361 BKT 2020 12 08 07 00 00 5590-99 G co CCGG 131.820 -999.990 ... AR2 2021 01 11 16 28 48 -0.2020 100.3180 875.00 845.00 30.00 484362 BKT 2020 12 15 07 00 00 1568-99 G co CCGG 129.240 -999.990 ... AR2 2021 01 11 15 45 53 -0.2020 100.3180 875.00 845.00 30.00 484363 BKT 2020 12 15 07 00 00 4950-99 G co CCGG 127.550 -999.990 ... AR2 2021 01 11 16 00 14 -0.2020 100.3180 875.00 845.00 30.00 484364 BKT 2020 12 22 07 00 00 1670-99 G co CCGG 196.390 -999.990 N.. AR2 2021 02 01 16 52 36 -0.2020 100.3180 875.00 845.00 30.00 484746 BKT 2020 12 22 07 00 00 5597-99 G co CCGG 193.030 -999.990 N.. AR2 2021 02 01 17 06 52 -0.2020 100.3180 875.00 845.00 30.00 484747 BKT 2020 12 29 07 00 00 3333-99 G co CCGG 131.670 -999.990 ... AR2 2021 02 01 12 35 57 -0.2020 100.3180 875.00 845.00 30.00 484748 BKT 2020 12 29 07 00 00 4632-99 G co CCGG 132.410 -999.990 ... AR2 2021 02 01 12 50 15 -0.2020 100.3180 875.00 845.00 30.00 484749