# number_of_header_lines: 69 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO CCGG (Individual Flasks) # contact_name: Gabrielle Petron # contact_telephone: (303) 497-4890 # contact_email: Gabrielle.Petron@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: CSIRO, Atmospheric Research [CSIRO] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: cgo # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2020-12-31 # description_creation-time: 2021-07-29 08:17:46 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number CGO 1990 11 16 03 58 00 1136-81 P co CCGG 84.620 -999.990 W.. R4 1990 12 20 13 26 00 -40.6800 144.6800 97.00 94.00 3.00 40432 CGO 1990 11 16 03 58 00 1136-81 P co CCGG 85.930 -999.990 W.. R4 1990 12 20 13 42 00 -40.6800 144.6800 97.00 94.00 3.00 40432 CGO 1990 11 16 03 59 00 76-81 N co CCGG 83.930 -999.990 W.. R4 1990 12 20 11 29 00 -40.6800 144.6800 97.00 94.00 3.00 40434 CGO 1990 11 16 03 59 00 76-81 N co CCGG 83.330 -999.990 W.. R4 1990 12 20 11 45 00 -40.6800 144.6800 97.00 94.00 3.00 40434 CGO 1990 11 22 04 47 00 1312-81 P co CCGG 83.600 -999.990 W.. R4 1990 12 27 12 13 00 -40.6800 144.6800 97.00 94.00 3.00 40436 CGO 1990 11 22 04 47 00 1312-81 P co CCGG 83.260 -999.990 W.. R4 1990 12 27 12 31 00 -40.6800 144.6800 97.00 94.00 3.00 40436 CGO 1990 11 22 04 48 00 1010-81 N co CCGG 177.180 -999.990 W.. R4 1990 12 27 12 47 00 -40.6800 144.6800 97.00 94.00 3.00 40438 CGO 1990 11 22 04 48 00 1010-81 N co CCGG 179.120 -999.990 W.. R4 1990 12 27 13 03 00 -40.6800 144.6800 97.00 94.00 3.00 40438 CGO 1990 11 29 04 12 00 2-81 P co CCGG 66.670 -999.990 W.. R4 1991 01 24 13 50 00 -40.6800 144.6800 97.00 94.00 3.00 40440 CGO 1990 11 29 04 12 00 2-81 P co CCGG 66.450 -999.990 W.. R4 1991 01 24 14 07 00 -40.6800 144.6800 97.00 94.00 3.00 40440 CGO 1990 11 29 04 20 00 1254-81 N co CCGG 72.760 -999.990 W.. R4 1991 01 24 13 16 00 -40.6800 144.6800 97.00 94.00 3.00 40442 CGO 1990 11 29 04 20 00 1254-81 N co CCGG 72.220 -999.990 W.. R4 1991 01 24 13 33 00 -40.6800 144.6800 97.00 94.00 3.00 40442 CGO 1990 12 06 04 17 00 1293-81 P co CCGG 76.710 -999.990 W.. R4 1991 01 03 13 25 00 -40.6800 144.6800 97.00 94.00 3.00 40443 CGO 1990 12 06 04 17 00 1293-81 P co CCGG 77.570 -999.990 W.. R4 1991 01 03 13 43 00 -40.6800 144.6800 97.00 94.00 3.00 40443 CGO 1990 12 06 04 20 00 1454-81 N co CCGG 78.310 -999.990 W.. R4 1991 01 03 11 47 00 -40.6800 144.6800 97.00 94.00 3.00 40446 CGO 1990 12 06 04 20 00 1454-81 N co CCGG 80.010 -999.990 W.. R4 1991 01 03 12 04 00 -40.6800 144.6800 97.00 94.00 3.00 40446 CGO 1990 12 12 22 38 00 1042-81 P co CCGG 100.080 -999.990 W.. R4 1991 01 25 14 12 00 -40.6800 144.6800 97.00 94.00 3.00 40448 CGO 1990 12 12 22 41 00 855-81 N co CCGG 69.040 -999.990 W.. R4 1991 01 29 08 34 00 -40.6800 144.6800 97.00 94.00 3.00 40449 CGO 1990 12 12 22 41 00 855-81 N co CCGG 64.240 -999.990 W.. R4 1991 01 29 08 50 00 -40.6800 144.6800 97.00 94.00 3.00 40449 CGO 1990 12 12 22 41 00 856-81 N co CCGG 78.030 -999.990 W.. R4 1991 01 25 13 53 00 -40.6800 144.6800 97.00 94.00 3.00 40450 CGO 1990 12 18 03 37 00 760-81 N co CCGG 100.560 -999.990 W.. R4 1991 01 24 19 15 00 -40.6800 144.6800 97.00 94.00 3.00 40452 CGO 1990 12 18 03 37 00 760-81 N co CCGG 99.520 -999.990 W.. R4 1991 01 24 19 32 00 -40.6800 144.6800 97.00 94.00 3.00 40452 CGO 1990 12 18 03 38 00 578-81 P co CCGG -999.990 -999.990 *.. R4 1991 01 24 19 48 00 -40.6800 144.6800 97.00 94.00 3.00 40454 CGO 1990 12 18 03 38 00 578-81 P co CCGG 166.230 -999.990 W.. R4 1991 01 24 20 04 00 -40.6800 144.6800 97.00 94.00 3.00 40454 CGO 1990 12 28 00 58 00 571-81 N co CCGG 112.220 -999.990 W.. R4 1991 01 29 10 32 00 -40.6800 144.6800 97.00 94.00 3.00 40455 CGO 1990 12 28 00 58 00 571-81 N co CCGG 112.390 -999.990 W.. R4 1991 01 29 10 49 00 -40.6800 144.6800 97.00 94.00 3.00 40455 CGO 1990 12 28 00 58 00 572-81 N co CCGG 92.430 -999.990 W.. R4 1991 01 25 13 19 00 -40.6800 144.6800 97.00 94.00 3.00 40456 CGO 1990 12 28 00 59 00 253-81 P co CCGG 72.360 -999.990 W.. R4 1991 01 29 09 08 00 -40.6800 144.6800 97.00 94.00 3.00 40457 CGO 1990 12 28 00 59 00 254-81 P co CCGG -999.990 -999.990 *.. R4 1991 01 25 13 36 00 -40.6800 144.6800 97.00 94.00 3.00 40458 CGO 1991 01 11 02 47 00 4-81 N co CCGG 82.090 -999.990 W.. R4 1991 01 29 09 59 00 -40.6800 144.6800 97.00 94.00 3.00 40462 CGO 1991 01 11 02 47 00 4-81 N co CCGG 82.330 -999.990 W.. R4 1991 01 29 10 15 00 -40.6800 144.6800 97.00 94.00 3.00 40462 CGO 1991 01 15 03 58 00 1473-81 P co CCGG 66.550 -999.990 W.. R4 1991 02 26 08 38 00 -40.6800 144.6800 97.00 94.00 3.00 40463 CGO 1991 01 15 03 58 00 1474-81 P co CCGG 68.020 -999.990 W.. R4 1991 02 25 13 33 00 -40.6800 144.6800 97.00 94.00 3.00 40464 CGO 1991 01 15 13 59 00 526-81 N co CCGG 59.140 -999.990 W.. R4 1991 02 25 15 31 00 -40.6800 144.6800 97.00 94.00 3.00 40466 CGO 1991 01 15 13 59 00 526-81 N co CCGG 58.090 -999.990 W.. R4 1991 02 25 15 48 00 -40.6800 144.6800 97.00 94.00 3.00 40466 CGO 1991 01 30 03 40 00 277-81 P co CCGG 99.640 -999.990 W.. R4 1991 02 27 19 21 00 -40.6800 144.6800 97.00 94.00 3.00 40467 CGO 1991 01 30 03 40 00 277-81 P co CCGG 101.160 -999.990 W.. R4 1991 02 27 19 38 00 -40.6800 144.6800 97.00 94.00 3.00 40467 CGO 1991 01 30 03 40 00 278-81 P co CCGG 95.450 -999.990 W.. R4 1991 02 26 12 50 00 -40.6800 144.6800 97.00 94.00 3.00 40468 CGO 1991 01 30 03 44 00 1295-81 N co CCGG 332.610 -999.990 W.C R4 1991 02 27 18 47 00 -40.6800 144.6800 97.00 94.00 3.00 40469 CGO 1991 01 30 03 44 00 1295-81 N co CCGG 334.550 -999.990 W.C R4 1991 02 27 19 04 00 -40.6800 144.6800 97.00 94.00 3.00 40469 CGO 1991 01 30 03 44 00 1296-81 N co CCGG 126.320 -999.990 W.. R4 1991 02 26 16 11 00 -40.6800 144.6800 97.00 94.00 3.00 40470 CGO 1991 01 30 03 44 00 1296-81 N co CCGG 126.300 -999.990 W.. R4 1991 02 26 16 29 00 -40.6800 144.6800 97.00 94.00 3.00 40470 CGO 1991 02 06 03 24 00 644-81 N co CCGG 158.800 -999.990 W.. R4 1991 03 25 12 25 00 -40.6800 144.6800 97.00 94.00 3.00 40472 CGO 1991 02 06 03 24 00 644-81 N co CCGG -999.990 -999.990 *.. R4 1991 03 25 12 41 00 -40.6800 144.6800 97.00 94.00 3.00 40472 CGO 1991 02 06 03 28 00 140-81 P co CCGG 54.970 -999.990 W.. R4 1991 03 25 11 37 00 -40.6800 144.6800 97.00 94.00 3.00 40474 CGO 1991 02 06 03 28 00 140-81 P co CCGG -999.990 -999.990 *.. R4 1991 03 25 11 53 00 -40.6800 144.6800 97.00 94.00 3.00 40474 CGO 1991 02 06 03 28 00 140-81 P co CCGG -999.990 -999.990 *.. R4 1991 03 25 12 09 00 -40.6800 144.6800 97.00 94.00 3.00 40474 CGO 1991 02 14 04 41 00 217-81 N co CCGG -999.990 -999.990 *.. R4 1991 03 13 12 52 00 -40.6800 144.6800 97.00 94.00 3.00 40475 CGO 1991 02 14 04 41 00 217-81 N co CCGG -999.990 -999.990 *.. R4 1991 03 13 13 08 00 -40.6800 144.6800 97.00 94.00 3.00 40475 CGO 1991 02 14 04 41 00 218-81 N co CCGG -999.990 -999.990 *.. R4 1991 03 12 15 38 00 -40.6800 144.6800 97.00 94.00 3.00 40476 CGO 1991 02 14 04 42 00 758-81 P co CCGG 87.060 -999.990 W.. R4 1991 03 12 15 04 00 -40.6800 144.6800 97.00 94.00 3.00 40478 CGO 1991 02 14 04 42 00 758-81 P co CCGG 87.030 -999.990 W.. R4 1991 03 12 15 21 00 -40.6800 144.6800 97.00 94.00 3.00 40478 CGO 1991 02 20 04 05 00 876-81 N co CCGG 51.770 -999.990 W.. R4 1991 03 12 16 31 00 -40.6800 144.6800 97.00 94.00 3.00 40480 CGO 1991 02 20 04 05 00 876-81 N co CCGG -999.990 -999.990 *.. R4 1991 03 12 16 48 00 -40.6800 144.6800 97.00 94.00 3.00 40480 CGO 1991 02 20 04 05 00 876-81 N co CCGG -999.990 -999.990 *.. R4 1991 03 12 17 05 00 -40.6800 144.6800 97.00 94.00 3.00 40480 CGO 1991 02 20 04 06 00 249-81 P co CCGG 63.820 -999.990 W.. R4 1991 03 13 12 08 00 -40.6800 144.6800 97.00 94.00 3.00 40481 CGO 1991 02 20 04 06 00 249-81 P co CCGG 63.110 -999.990 W.. R4 1991 03 13 12 25 00 -40.6800 144.6800 97.00 94.00 3.00 40481 CGO 1991 02 20 04 06 00 250-81 P co CCGG 62.760 -999.990 W.. R4 1991 03 12 15 58 00 -40.6800 144.6800 97.00 94.00 3.00 40482 CGO 1991 03 01 04 51 00 908-81 P co CCGG 186.390 -999.990 W.. R4 1991 03 29 14 08 00 -40.6800 144.6800 97.00 94.00 3.00 40484 CGO 1991 03 01 04 51 00 908-81 P co CCGG 185.190 -999.990 W.. R4 1991 03 29 14 25 00 -40.6800 144.6800 97.00 94.00 3.00 40484 CGO 1991 03 01 04 54 00 444-81 N co CCGG 68.900 -999.990 W.. R4 1991 03 29 10 56 00 -40.6800 144.6800 97.00 94.00 3.00 40486 CGO 1991 03 01 04 54 00 444-81 N co CCGG 70.020 -999.990 W.. R4 1991 03 29 11 13 00 -40.6800 144.6800 97.00 94.00 3.00 40486 CGO 1991 03 11 02 36 00 588-81 P co CCGG 99.570 -999.990 W.. R4 1991 03 29 12 02 00 -40.6800 144.6800 97.00 94.00 3.00 40488 CGO 1991 03 11 02 36 00 588-81 P co CCGG 101.010 -999.990 W.. R4 1991 03 29 12 18 00 -40.6800 144.6800 97.00 94.00 3.00 40488 CGO 1991 03 11 02 39 00 215-81 N co CCGG 62.180 -999.990 W.. R4 1991 04 01 13 23 00 -40.6800 144.6800 97.00 94.00 3.00 40489 CGO 1991 03 11 02 39 00 215-81 N co CCGG 65.860 -999.990 W.. R4 1991 04 01 13 40 00 -40.6800 144.6800 97.00 94.00 3.00 40489 CGO 1991 03 11 02 39 00 216-81 N co CCGG 69.680 -999.990 W.. R4 1991 03 29 12 35 00 -40.6800 144.6800 97.00 94.00 3.00 40490 CGO 1991 03 13 01 58 00 208-81 N co CCGG -999.990 -999.990 *.. R4 1991 03 29 11 29 00 -40.6800 144.6800 97.00 94.00 3.00 40492 CGO 1991 03 13 01 58 00 208-81 N co CCGG -999.990 -999.990 *.. R4 1991 03 29 11 45 00 -40.6800 144.6800 97.00 94.00 3.00 40492 CGO 1991 03 13 02 15 00 224-81 P co CCGG 156.530 -999.990 W.. R4 1991 03 29 10 24 00 -40.6800 144.6800 97.00 94.00 3.00 40494 CGO 1991 03 13 02 15 00 224-81 P co CCGG 155.110 -999.990 W.. R4 1991 03 29 10 40 00 -40.6800 144.6800 97.00 94.00 3.00 40494 CGO 1991 03 27 00 56 00 1238-81 N co CCGG -999.990 -999.990 *.. R4 1991 05 08 11 59 00 -40.6800 144.6800 97.00 94.00 3.00 40496 CGO 1991 03 27 00 56 00 1238-81 N co CCGG -999.990 -999.990 *.. R4 1991 05 08 12 15 00 -40.6800 144.6800 97.00 94.00 3.00 40496 CGO 1991 03 27 00 58 00 542-81 P co CCGG 471.470 -999.990 W.C R4 1991 05 08 12 31 00 -40.6800 144.6800 97.00 94.00 3.00 40498 CGO 1991 03 27 00 58 00 542-81 P co CCGG 471.730 -999.990 W.C R4 1991 05 08 12 48 00 -40.6800 144.6800 97.00 94.00 3.00 40498 CGO 1991 04 03 05 43 00 16-81 N co CCGG -999.990 -999.990 *.. R4 1991 05 08 15 02 00 -40.6800 144.6800 97.00 94.00 3.00 40500 CGO 1991 04 03 05 43 00 16-81 N co CCGG -999.990 -999.990 *.. R4 1991 05 08 15 18 00 -40.6800 144.6800 97.00 94.00 3.00 40500 CGO 1991 04 03 05 44 00 150-81 P co CCGG 106.960 -999.990 W.. R4 1991 05 08 14 29 00 -40.6800 144.6800 97.00 94.00 3.00 40502 CGO 1991 04 03 05 44 00 150-81 P co CCGG 109.620 -999.990 W.. R4 1991 05 08 14 46 00 -40.6800 144.6800 97.00 94.00 3.00 40502 CGO 1991 04 04 02 58 00 82-81 N co CCGG 137.760 -999.990 W.. R4 1991 05 09 11 30 00 -40.6800 144.6800 97.00 94.00 3.00 40504 CGO 1991 04 04 02 58 00 82-81 N co CCGG 139.930 -999.990 W.. R4 1991 05 09 11 47 00 -40.6800 144.6800 97.00 94.00 3.00 40504 CGO 1991 04 04 03 00 00 594-81 P co CCGG 308.250 -999.990 W.C R4 1991 05 09 10 58 00 -40.6800 144.6800 97.00 94.00 3.00 40506 CGO 1991 04 04 03 00 00 594-81 P co CCGG 306.570 -999.990 W.C R4 1991 05 09 11 14 00 -40.6800 144.6800 97.00 94.00 3.00 40506 CGO 1991 04 18 00 42 00 468-81 P co CCGG 54.950 -999.990 W.. R4 1991 05 03 14 25 00 -40.6800 144.6800 97.00 94.00 3.00 40508 CGO 1991 04 18 00 42 00 468-81 P co CCGG 56.400 -999.990 W.. R4 1991 05 03 14 42 00 -40.6800 144.6800 97.00 94.00 3.00 40508 CGO 1991 04 18 00 45 00 40-81 N co CCGG 64.620 -999.990 W.. R4 1991 05 03 14 58 00 -40.6800 144.6800 97.00 94.00 3.00 40510 CGO 1991 04 18 00 45 00 40-81 N co CCGG 63.480 -999.990 W.. R4 1991 05 03 15 14 00 -40.6800 144.6800 97.00 94.00 3.00 40510 CGO 1991 04 22 03 39 00 502-81 P co CCGG 115.010 -999.990 W.. R4 1991 06 28 14 31 00 -40.6800 144.6800 97.00 94.00 3.00 40512 CGO 1991 04 22 03 39 00 502-81 P co CCGG 114.480 -999.990 W.. R4 1991 06 28 14 48 00 -40.6800 144.6800 97.00 94.00 3.00 40512 CGO 1991 04 22 03 42 00 382-81 N co CCGG 108.580 -999.990 W.. R4 1991 06 28 15 04 00 -40.6800 144.6800 97.00 94.00 3.00 40514 CGO 1991 04 22 03 42 00 382-81 N co CCGG 108.820 -999.990 W.. R4 1991 06 28 15 20 00 -40.6800 144.6800 97.00 94.00 3.00 40514 CGO 1991 05 03 03 41 00 930-81 P co CCGG 115.700 -999.990 W.. R4 1991 06 28 10 10 00 -40.6800 144.6800 97.00 94.00 3.00 40516 CGO 1991 05 03 03 41 00 930-81 P co CCGG 116.980 -999.990 W.. R4 1991 06 28 10 28 00 -40.6800 144.6800 97.00 94.00 3.00 40516 CGO 1991 05 03 03 45 00 24-81 N co CCGG 75.300 -999.990 W.. R4 1991 06 28 12 00 00 -40.6800 144.6800 97.00 94.00 3.00 40517 CGO 1991 05 10 02 40 00 270-81 P co CCGG 93.510 -999.990 W.. R4 1991 06 10 13 06 00 -40.6800 144.6800 97.00 94.00 3.00 40519 CGO 1991 05 10 02 40 00 270-81 P co CCGG 92.970 -999.990 W.. R4 1991 06 10 13 22 00 -40.6800 144.6800 97.00 94.00 3.00 40519 CGO 1991 05 10 02 45 00 726-81 N co CCGG 57.960 -999.990 W.. R4 1991 06 10 12 34 00 -40.6800 144.6800 97.00 94.00 3.00 40521 CGO 1991 05 10 02 45 00 726-81 N co CCGG -999.990 -999.990 *.. R4 1991 06 10 12 50 00 -40.6800 144.6800 97.00 94.00 3.00 40521 CGO 1991 05 16 04 52 00 1128-81 P co CCGG 66.170 -999.990 W.. R4 1991 06 07 10 44 00 -40.6800 144.6800 97.00 94.00 3.00 40525 CGO 1991 05 16 04 52 00 1128-81 P co CCGG 65.640 -999.990 W.. R4 1991 06 07 11 00 00 -40.6800 144.6800 97.00 94.00 3.00 40525 CGO 1991 05 16 04 52 00 562-81 N co CCGG 64.570 -999.990 W.. R4 1991 06 06 14 19 00 -40.6800 144.6800 97.00 94.00 3.00 40523 CGO 1991 05 16 04 52 00 562-81 N co CCGG 64.910 -999.990 W.. R4 1991 06 06 14 36 00 -40.6800 144.6800 97.00 94.00 3.00 40523 CGO 1991 06 04 04 49 00 844-81 P co CCGG 147.450 -999.990 W.. R4 1991 07 01 09 02 00 -40.6800 144.6800 97.00 94.00 3.00 40527 CGO 1991 06 04 04 49 00 844-81 P co CCGG 149.670 -999.990 W.. R4 1991 07 01 09 20 00 -40.6800 144.6800 97.00 94.00 3.00 40527 CGO 1991 06 07 03 42 00 1242-81 P co CCGG 59.950 -999.990 W.. R4 1991 06 28 12 19 00 -40.6800 144.6800 97.00 94.00 3.00 40529 CGO 1991 06 07 03 42 00 1242-81 P co CCGG 59.850 -999.990 W.. R4 1991 06 28 12 35 00 -40.6800 144.6800 97.00 94.00 3.00 40529 CGO 1991 06 14 06 28 00 6158-66 P co CCGG 57.150 -999.990 ... R4 1991 07 15 15 15 00 -40.6800 144.6800 97.00 94.00 3.00 40531 CGO 1991 06 14 06 28 00 6158-66 P co CCGG -999.990 -999.990 *.. R4 1991 07 15 15 31 00 -40.6800 144.6800 97.00 94.00 3.00 40531 CGO 1991 06 18 02 00 00 6182-66 P co CCGG 58.290 -999.990 ... R4 1991 07 15 14 43 00 -40.6800 144.6800 97.00 94.00 3.00 40533 CGO 1991 06 18 02 00 00 6182-66 P co CCGG 58.660 -999.990 ... R4 1991 07 15 14 59 00 -40.6800 144.6800 97.00 94.00 3.00 40533 CGO 1991 07 15 03 16 00 6390-66 P co CCGG 63.230 -999.990 ... R4 1991 08 21 17 39 00 -40.6800 144.6800 97.00 94.00 3.00 40535 CGO 1991 07 15 03 16 00 6390-66 P co CCGG 63.940 -999.990 ... R4 1991 08 21 17 55 00 -40.6800 144.6800 97.00 94.00 3.00 40535 CGO 1991 07 23 04 15 00 6038-66 P co CCGG 64.250 -999.990 ... R4 1991 08 22 09 49 00 -40.6800 144.6800 97.00 94.00 3.00 40537 CGO 1991 07 23 04 15 00 6038-66 P co CCGG 64.510 -999.990 ... R4 1991 08 22 10 05 00 -40.6800 144.6800 97.00 94.00 3.00 40537 CGO 1991 07 29 05 43 00 6180-66 P co CCGG 73.430 -999.990 .X. R4 1991 08 28 18 04 00 -40.6800 144.6800 97.00 94.00 3.00 40539 CGO 1991 07 29 05 43 00 6180-66 P co CCGG 74.180 -999.990 .X. R4 1991 08 28 18 20 00 -40.6800 144.6800 97.00 94.00 3.00 40539 CGO 1991 08 06 01 41 00 6122-66 P co CCGG 64.390 -999.990 ... R4 1991 08 28 17 32 00 -40.6800 144.6800 97.00 94.00 3.00 40541 CGO 1991 08 06 01 41 00 6122-66 P co CCGG 64.970 -999.990 ... R4 1991 08 28 17 48 00 -40.6800 144.6800 97.00 94.00 3.00 40541 CGO 1991 08 15 02 31 00 6152-66 P co CCGG 66.280 -999.990 ... R4 1991 09 19 14 30 00 -40.6800 144.6800 97.00 94.00 3.00 40543 CGO 1991 08 15 02 31 00 6152-66 P co CCGG 65.320 -999.990 ... R4 1991 09 19 14 46 00 -40.6800 144.6800 97.00 94.00 3.00 40543 CGO 1991 08 30 05 42 00 6088-66 P co CCGG 68.750 -999.990 ... R4 1991 09 19 16 51 00 -40.6800 144.6800 97.00 94.00 3.00 40545 CGO 1991 08 30 05 42 00 6088-66 P co CCGG 68.610 -999.990 ... R4 1991 09 19 17 07 00 -40.6800 144.6800 97.00 94.00 3.00 40545 CGO 1991 09 03 04 27 00 6116-66 P co CCGG 70.240 -999.990 ... R4 1991 10 02 15 18 00 -40.6800 144.6800 97.00 94.00 3.00 40547 CGO 1991 09 03 04 27 00 6116-66 P co CCGG 71.250 -999.990 ... R4 1991 10 02 15 34 00 -40.6800 144.6800 97.00 94.00 3.00 40547 CGO 1991 09 11 01 36 00 6420-66 P co CCGG 69.770 -999.990 ... R4 1991 10 02 17 19 00 -40.6800 144.6800 97.00 94.00 3.00 40549 CGO 1991 09 11 01 36 00 6420-66 P co CCGG 70.460 -999.990 ... R4 1991 10 02 17 35 00 -40.6800 144.6800 97.00 94.00 3.00 40549 CGO 1991 09 19 05 59 00 6269-66 P co CCGG 71.270 -999.990 ... R4 1991 10 25 11 55 00 -40.6800 144.6800 97.00 94.00 3.00 40550 CGO 1991 09 19 05 59 00 6270-66 P co CCGG 69.940 -999.990 ... R4 1991 10 25 12 11 00 -40.6800 144.6800 97.00 94.00 3.00 40551 CGO 1991 09 30 00 45 00 6389-66 P co CCGG 75.890 -999.990 ... R4 1991 10 25 12 27 00 -40.6800 144.6800 97.00 94.00 3.00 40552 CGO 1991 09 30 00 45 00 6390-66 P co CCGG 75.710 -999.990 ... R4 1991 10 25 12 43 00 -40.6800 144.6800 97.00 94.00 3.00 40553 CGO 1991 10 02 04 59 00 6385-66 P co CCGG 76.110 -999.990 ... R4 1991 12 18 12 47 00 -40.6800 144.6800 97.00 94.00 3.00 40554 CGO 1991 10 02 04 59 00 6386-66 P co CCGG 76.060 -999.990 ... R4 1991 12 18 13 03 00 -40.6800 144.6800 97.00 94.00 3.00 40555 CGO 1991 10 07 03 34 00 6105-66 P co CCGG 78.280 -999.990 ... R4 1991 12 18 15 11 00 -40.6800 144.6800 97.00 94.00 3.00 40556 CGO 1991 10 07 03 34 00 6106-66 P co CCGG 80.020 -999.990 ... R4 1991 12 18 15 27 00 -40.6800 144.6800 97.00 94.00 3.00 40557 CGO 1991 10 17 02 35 00 6363-66 P co CCGG 78.550 -999.990 ... R4 1991 11 15 09 12 00 -40.6800 144.6800 97.00 94.00 3.00 40558 CGO 1991 10 17 02 35 00 6364-66 P co CCGG 78.240 -999.990 ... R4 1991 11 15 09 28 00 -40.6800 144.6800 97.00 94.00 3.00 40559 CGO 1991 10 22 01 47 00 6375-66 P co CCGG 79.800 -999.990 ... R4 1991 11 15 08 39 00 -40.6800 144.6800 97.00 94.00 3.00 40560 CGO 1991 10 22 01 47 00 6376-66 P co CCGG 80.180 -999.990 ... R4 1991 11 15 08 56 00 -40.6800 144.6800 97.00 94.00 3.00 40561 CGO 1991 11 04 01 16 00 6175-66 P co CCGG 71.970 -999.990 ... R4 1992 02 04 10 57 00 -40.6800 144.6800 97.00 94.00 3.00 40562 CGO 1991 11 20 02 46 00 6211-66 P co CCGG 75.020 -999.990 ... R4 1992 02 04 08 36 00 -40.6800 144.6800 97.00 94.00 3.00 40563 CGO 1991 11 20 02 46 00 6212-66 P co CCGG 73.100 -999.990 ... R4 1992 02 04 08 52 00 -40.6800 144.6800 97.00 94.00 3.00 40564 CGO 1991 11 29 00 17 00 6127-66 P co CCGG 73.710 -999.990 ... R4 1992 02 04 10 13 00 -40.6800 144.6800 97.00 94.00 3.00 40565 CGO 1991 12 23 02 56 00 6291-66 P co CCGG 65.370 -999.990 ..I R4 1992 02 04 09 09 00 -40.6800 144.6800 97.00 94.00 3.00 40566 CGO 1991 12 23 02 56 00 6292-66 P co CCGG 65.660 -999.990 ... R4 1992 02 04 09 25 00 -40.6800 144.6800 97.00 94.00 3.00 40567 CGO 1992 01 02 23 04 00 6059-66 P co CCGG 61.760 -999.990 ... R4 1992 02 13 13 21 00 -40.6800 144.6800 97.00 94.00 3.00 40568 CGO 1992 01 02 23 04 00 6060-66 P co CCGG 63.060 -999.990 ... R4 1992 02 13 13 37 00 -40.6800 144.6800 97.00 94.00 3.00 40569 CGO 1992 01 14 02 18 00 6287-66 P co CCGG 60.340 -999.990 ..I R4 1992 02 13 13 53 00 -40.6800 144.6800 97.00 94.00 3.00 40570 CGO 1992 01 14 02 18 00 6288-66 P co CCGG 59.690 -999.990 ... R4 1992 02 13 14 09 00 -40.6800 144.6800 97.00 94.00 3.00 40571 CGO 1992 01 23 00 56 00 6449-66 P co CCGG 60.460 -999.990 ..I R4 1992 03 05 09 48 00 -40.6800 144.6800 97.00 94.00 3.00 40572 CGO 1992 01 23 00 56 00 6450-66 P co CCGG 59.780 -999.990 ... R4 1992 03 05 10 04 00 -40.6800 144.6800 97.00 94.00 3.00 40573 CGO 1992 01 31 00 59 00 6447-66 P co CCGG 57.590 -999.990 ... R4 1992 03 05 09 16 00 -40.6800 144.6800 97.00 94.00 3.00 40574 CGO 1992 01 31 00 59 00 6448-66 P co CCGG 57.780 -999.990 ... R4 1992 03 05 09 32 00 -40.6800 144.6800 97.00 94.00 3.00 40575 CGO 1992 02 12 03 58 00 6371-66 P co CCGG 55.460 -999.990 ..I R4 1992 04 01 16 02 00 -40.6800 144.6800 97.00 94.00 3.00 40576 CGO 1992 02 12 03 58 00 6372-66 P co CCGG 55.190 -999.990 ... R4 1992 04 01 16 18 00 -40.6800 144.6800 97.00 94.00 3.00 40577 CGO 1992 02 26 01 59 00 6101-66 P co CCGG 52.910 -999.990 ... R4 1992 04 01 15 29 00 -40.6800 144.6800 97.00 94.00 3.00 40578 CGO 1992 02 26 01 59 00 6102-66 P co CCGG 52.670 -999.990 ... R4 1992 04 01 15 45 00 -40.6800 144.6800 97.00 94.00 3.00 40579 CGO 1992 03 06 01 59 00 6317-66 P co CCGG 54.410 -999.990 ..I R4 1992 04 23 12 58 00 -40.6800 144.6800 97.00 94.00 3.00 40580 CGO 1992 03 06 01 59 00 6318-66 P co CCGG 52.990 -999.990 ... R4 1992 04 23 13 14 00 -40.6800 144.6800 97.00 94.00 3.00 40581 CGO 1992 03 16 01 34 00 6441-66 P co CCGG 53.880 -999.990 ..I R4 1992 05 14 12 00 00 -40.6800 144.6800 97.00 94.00 3.00 40582 CGO 1992 03 16 01 34 00 6442-66 P co CCGG 53.860 -999.990 ... R4 1992 05 14 12 15 00 -40.6800 144.6800 97.00 94.00 3.00 40583 CGO 1992 03 27 03 59 00 6519-66 P co CCGG 54.270 -999.990 ... R4 1992 05 14 13 44 00 -40.6800 144.6800 97.00 94.00 3.00 40584 CGO 1992 03 27 03 59 00 6520-66 P co CCGG 52.580 -999.990 ... R4 1992 05 14 14 00 00 -40.6800 144.6800 97.00 94.00 3.00 40585 CGO 1992 04 07 02 46 00 6003-66 P co CCGG 53.940 -999.990 ... R4 1992 05 21 17 17 00 -40.6800 144.6800 97.00 94.00 3.00 40586 CGO 1992 04 07 02 46 00 6004-66 P co CCGG 53.990 -999.990 ... R4 1992 05 21 17 33 00 -40.6800 144.6800 97.00 94.00 3.00 40587 CGO 1992 04 16 03 26 00 6291-66 P co CCGG 55.010 -999.990 ..I R4 1992 05 21 16 45 00 -40.6800 144.6800 97.00 94.00 3.00 40588 CGO 1992 04 16 03 26 00 6292-66 P co CCGG 55.110 -999.990 ... R4 1992 05 21 17 01 00 -40.6800 144.6800 97.00 94.00 3.00 40589 CGO 1992 04 22 05 18 00 6115-66 P co CCGG 54.890 -999.990 ... R4 1992 06 04 09 11 00 -40.6800 144.6800 97.00 94.00 3.00 40590 CGO 1992 04 22 05 18 00 6116-66 P co CCGG 55.770 -999.990 ... R4 1992 06 04 09 27 00 -40.6800 144.6800 97.00 94.00 3.00 40591 CGO 1992 04 30 05 45 00 6385-66 P co CCGG 61.870 -999.990 ..I R4 1992 06 04 09 43 00 -40.6800 144.6800 97.00 94.00 3.00 40592 CGO 1992 04 30 05 45 00 6386-66 P co CCGG 61.750 -999.990 ... R4 1992 06 04 09 59 00 -40.6800 144.6800 97.00 94.00 3.00 40593 CGO 1992 05 13 01 55 00 6389-66 P co CCGG 57.500 -999.990 ..I R4 1992 06 30 12 20 00 -40.6800 144.6800 97.00 94.00 3.00 40594 CGO 1992 05 13 01 55 00 6390-66 P co CCGG 57.210 -999.990 ... R4 1992 06 30 12 36 00 -40.6800 144.6800 97.00 94.00 3.00 40595 CGO 1992 05 26 05 38 00 6391-66 P co CCGG 59.930 -999.990 ... R4 1992 06 30 11 49 00 -40.6800 144.6800 97.00 94.00 3.00 40596 CGO 1992 05 26 05 38 00 6392-66 P co CCGG 59.670 -999.990 ... R4 1992 06 30 12 05 00 -40.6800 144.6800 97.00 94.00 3.00 40597 CGO 1992 06 02 02 22 00 6147-66 P co CCGG 61.120 -999.990 ..I R4 1992 09 03 08 35 00 -40.6800 144.6800 97.00 94.00 3.00 40598 CGO 1992 06 02 02 22 00 6148-66 P co CCGG 60.590 -999.990 ... R4 1992 09 03 08 51 00 -40.6800 144.6800 97.00 94.00 3.00 40599 CGO 1992 06 10 04 22 00 6447-66 P co CCGG 59.500 -999.990 ... R4 1992 09 02 15 59 00 -40.6800 144.6800 97.00 94.00 3.00 40600 CGO 1992 06 10 04 22 00 6448-66 P co CCGG 60.380 -999.990 ... R4 1992 09 02 16 15 00 -40.6800 144.6800 97.00 94.00 3.00 40601 CGO 1992 07 09 02 50 00 6005-66 P co CCGG 65.700 -999.990 ..I R4 1992 08 28 09 35 00 -40.6800 144.6800 97.00 94.00 3.00 40602 CGO 1992 07 09 02 50 00 6006-66 P co CCGG 64.320 -999.990 ... R4 1992 08 28 09 51 00 -40.6800 144.6800 97.00 94.00 3.00 40603 CGO 1992 07 15 04 55 00 6781-66 P co CCGG 70.210 -999.990 ... R4 1992 08 28 09 03 00 -40.6800 144.6800 97.00 94.00 3.00 40604 CGO 1992 07 15 04 55 00 6782-66 P co CCGG 70.610 -999.990 ... R4 1992 08 28 09 19 00 -40.6800 144.6800 97.00 94.00 3.00 40605 CGO 1992 07 22 05 08 00 6344-66 P co CCGG 66.270 -999.990 ... R4 1992 09 11 09 19 00 -40.6800 144.6800 97.00 94.00 3.00 40606 CGO 1992 07 29 01 55 00 6313-66 P co CCGG 68.670 -999.990 ..I R4 1992 09 11 08 31 00 -40.6800 144.6800 97.00 94.00 3.00 40607 CGO 1992 07 29 01 55 00 6314-66 P co CCGG 68.740 -999.990 ... R4 1992 09 11 08 47 00 -40.6800 144.6800 97.00 94.00 3.00 40608 CGO 1992 08 03 04 33 00 6441-66 P co CCGG 67.710 -999.990 ..I R4 1992 10 29 09 17 00 -40.6800 144.6800 97.00 94.00 3.00 40609 CGO 1992 08 03 04 33 00 6442-66 P co CCGG 66.810 -999.990 ... R4 1992 10 29 09 33 00 -40.6800 144.6800 97.00 94.00 3.00 40610 CGO 1992 08 11 05 57 00 6143-66 P co CCGG 69.150 -999.990 ... R4 1992 10 29 08 45 00 -40.6800 144.6800 97.00 94.00 3.00 40611 CGO 1992 08 11 05 57 00 6144-66 P co CCGG 67.890 -999.990 ... R4 1992 10 29 09 01 00 -40.6800 144.6800 97.00 94.00 3.00 40612 CGO 1992 08 17 04 00 00 6051-66 P co CCGG 67.280 -999.990 ... R4 1992 11 06 12 38 00 -40.6800 144.6800 97.00 94.00 3.00 40613 CGO 1992 09 02 04 04 00 6577-66 P co CCGG 69.970 -999.990 ... R4 1992 11 06 13 10 00 -40.6800 144.6800 97.00 94.00 3.00 40614 CGO 1992 09 02 04 04 00 6578-66 P co CCGG 70.680 -999.990 ..I R4 1992 11 06 13 26 00 -40.6800 144.6800 97.00 94.00 3.00 40615 CGO 1992 09 11 02 00 00 6717-66 P co CCGG 69.750 -999.990 ..I R4 1992 12 18 11 45 00 -40.6800 144.6800 97.00 94.00 3.00 40616 CGO 1992 09 11 02 00 00 6718-66 P co CCGG 70.350 -999.990 ... R4 1992 12 18 12 01 00 -40.6800 144.6800 97.00 94.00 3.00 40617 CGO 1992 09 15 05 48 00 6829-66 P co CCGG 69.260 -999.990 ... R4 1992 12 09 13 38 00 -40.6800 144.6800 97.00 94.00 3.00 40618 CGO 1992 09 15 05 48 00 6830-66 P co CCGG 68.500 -999.990 ... R4 1992 12 09 13 54 00 -40.6800 144.6800 97.00 94.00 3.00 40619 CGO 1992 09 24 04 57 00 6301-66 P co CCGG 69.080 -999.990 ..I R4 1992 12 09 13 06 00 -40.6800 144.6800 97.00 94.00 3.00 40620 CGO 1992 09 29 04 12 00 6227-66 P co CCGG 70.090 -999.990 ..I R4 1992 12 18 13 03 00 -40.6800 144.6800 97.00 94.00 3.00 40621 CGO 1992 10 01 04 04 00 6403-66 P co CCGG 68.630 -999.990 ... R4 1992 12 18 11 13 00 -40.6800 144.6800 97.00 94.00 3.00 40622 CGO 1992 10 01 04 04 00 6404-66 P co CCGG 69.300 -999.990 ... R4 1992 12 18 11 29 00 -40.6800 144.6800 97.00 94.00 3.00 40623 CGO 1992 10 19 04 00 00 6192-66 P co CCGG 73.400 -999.990 ... R4 1993 01 12 12 40 00 -40.6800 144.6800 97.00 94.00 3.00 40624 CGO 1992 10 19 04 19 00 6539-66 P co CCGG 68.390 -999.990 ..I R4 1993 01 12 11 32 00 -40.6800 144.6800 97.00 94.00 3.00 40625 CGO 1992 10 19 04 19 00 6540-66 P co CCGG 68.640 -999.990 ... R4 1993 01 12 11 49 00 -40.6800 144.6800 97.00 94.00 3.00 40626 CGO 1992 11 05 01 21 00 6507-66 P co CCGG 65.450 -999.990 ... R4 1992 12 21 11 35 00 -40.6800 144.6800 97.00 94.00 3.00 40627 CGO 1992 11 05 01 21 00 6508-66 P co CCGG 65.420 -999.990 ... R4 1992 12 21 11 51 00 -40.6800 144.6800 97.00 94.00 3.00 40628 CGO 1992 11 25 01 43 00 6711-66 P co CCGG 60.120 -999.990 ..I R4 1992 12 21 11 03 00 -40.6800 144.6800 97.00 94.00 3.00 40629 CGO 1992 11 25 01 43 00 6712-66 P co CCGG -999.990 -999.990 *.. R4 1992 12 21 11 19 00 -40.6800 144.6800 97.00 94.00 3.00 40630 CGO 1992 12 14 01 59 00 6857-66 P co CCGG 55.920 -999.990 ..I R4 1993 02 22 09 46 00 -40.6800 144.6800 97.00 94.00 3.00 40631 CGO 1992 12 14 01 59 00 6858-66 P co CCGG 55.870 -999.990 ... R4 1993 02 22 10 02 00 -40.6800 144.6800 97.00 94.00 3.00 40632 CGO 1992 12 21 00 45 00 6859-66 P co CCGG 60.810 -999.990 .X. R4 1993 02 22 10 18 00 -40.6800 144.6800 97.00 94.00 3.00 40633 CGO 1992 12 21 00 45 00 6860-66 P co CCGG 59.450 -999.990 .X. R4 1993 02 22 10 34 00 -40.6800 144.6800 97.00 94.00 3.00 40634 CGO 1993 01 04 02 17 00 6259-66 P co CCGG 51.690 -999.990 ..I R4 1993 02 22 09 14 00 -40.6800 144.6800 97.00 94.00 3.00 40635 CGO 1993 01 04 02 17 00 6260-66 P co CCGG 52.210 -999.990 ... R4 1993 02 22 09 30 00 -40.6800 144.6800 97.00 94.00 3.00 40636 CGO 1993 01 06 03 38 00 6697-66 P co CCGG 50.160 -999.990 ... R4 1993 02 22 08 42 00 -40.6800 144.6800 97.00 94.00 3.00 40637 CGO 1993 01 06 03 38 00 6698-66 P co CCGG 50.500 -999.990 ... R4 1993 02 22 08 58 00 -40.6800 144.6800 97.00 94.00 3.00 40638 CGO 1993 01 12 01 04 00 6381-66 P co CCGG 46.060 -999.990 ... R4 1993 03 23 15 09 00 -40.6800 144.6800 97.00 94.00 3.00 40639 CGO 1993 01 12 01 04 00 6382-66 P co CCGG 44.950 -999.990 ... R4 1993 03 23 15 25 00 -40.6800 144.6800 97.00 94.00 3.00 40640 CGO 1993 02 11 23 47 00 6593-66 P co CCGG 42.860 -999.990 ..I R4 1993 03 23 14 37 00 -40.6800 144.6800 97.00 94.00 3.00 40641 CGO 1993 02 11 23 47 00 6594-66 P co CCGG 43.170 -999.990 ... R4 1993 03 23 14 53 00 -40.6800 144.6800 97.00 94.00 3.00 40642 CGO 1993 02 16 04 31 00 6507-66 P co CCGG 45.310 -999.990 ... R4 1993 03 29 08 30 00 -40.6800 144.6800 97.00 94.00 3.00 40643 CGO 1993 02 16 04 31 00 6508-66 P co CCGG 47.120 -999.990 ... R4 1993 03 29 08 46 00 -40.6800 144.6800 97.00 94.00 3.00 40644 CGO 1993 02 20 09 06 00 6711-66 P co CCGG 42.100 -999.990 ..I R4 1993 03 29 09 03 00 -40.6800 144.6800 97.00 94.00 3.00 40645 CGO 1993 02 20 09 06 00 6712-66 P co CCGG 41.410 -999.990 ... R4 1993 03 29 09 19 00 -40.6800 144.6800 97.00 94.00 3.00 40646 CGO 1993 02 24 04 35 00 6061-66 P co CCGG 44.010 -999.990 ... R4 1993 03 25 09 20 00 -40.6800 144.6800 97.00 94.00 3.00 40647 CGO 1993 02 24 04 35 00 6062-66 P co CCGG 44.120 -999.990 ... R4 1993 03 25 09 36 00 -40.6800 144.6800 97.00 94.00 3.00 40648 CGO 1993 03 02 03 59 00 6231-66 P co CCGG -999.990 -999.990 *.. R4 1993 03 25 08 48 00 -40.6800 144.6800 97.00 94.00 3.00 40649 CGO 1993 03 02 03 59 00 6232-66 P co CCGG 42.000 -999.990 ..C R4 1993 03 25 09 04 00 -40.6800 144.6800 97.00 94.00 3.00 40650 CGO 1993 03 10 01 09 00 6533-66 P co CCGG 45.500 -999.990 ... R4 1993 04 21 11 07 00 -40.6800 144.6800 97.00 94.00 3.00 40651 CGO 1993 03 10 01 09 00 6534-66 P co CCGG 46.590 -999.990 ... R4 1993 04 21 11 23 00 -40.6800 144.6800 97.00 94.00 3.00 40652 CGO 1993 03 23 01 25 00 6341-66 P co CCGG 58.700 -999.990 .XI R4 1993 04 21 09 15 00 -40.6800 144.6800 97.00 94.00 3.00 40653 CGO 1993 03 23 01 25 00 6342-66 P co CCGG 59.300 -999.990 .X. R4 1993 04 21 09 32 00 -40.6800 144.6800 97.00 94.00 3.00 40654 CGO 1993 03 29 02 55 00 6023-66 P co CCGG 51.250 -999.990 ..I R4 1993 05 07 09 19 00 -40.6800 144.6800 97.00 94.00 3.00 40655 CGO 1993 03 29 02 55 00 6024-66 P co CCGG 50.300 -999.990 ... R4 1993 05 07 09 35 00 -40.6800 144.6800 97.00 94.00 3.00 40656 CGO 1993 04 01 01 45 00 6321-66 P co CCGG 47.430 -999.990 ... R4 1993 05 07 08 46 00 -40.6800 144.6800 97.00 94.00 3.00 40657 CGO 1993 04 01 01 45 00 6322-66 P co CCGG 45.960 -999.990 ... R4 1993 05 07 09 03 00 -40.6800 144.6800 97.00 94.00 3.00 40658 CGO 1993 04 08 04 55 00 6401-66 P co CCGG -999.990 -999.990 *.. R4 1993 05 14 13 53 00 -40.6800 144.6800 97.00 94.00 3.00 40659 CGO 1993 04 08 04 55 00 6402-66 P co CCGG -999.990 -999.990 *.. R4 1993 05 14 14 09 00 -40.6800 144.6800 97.00 94.00 3.00 40660 CGO 1993 04 14 02 20 00 6823-66 P co CCGG -999.990 -999.990 *.I R4 1993 05 14 14 26 00 -40.6800 144.6800 97.00 94.00 3.00 40661 CGO 1993 04 14 02 20 00 6824-66 P co CCGG -999.990 -999.990 *.. R4 1993 05 14 14 42 00 -40.6800 144.6800 97.00 94.00 3.00 40662 CGO 1993 04 20 03 30 00 6547-66 P co CCGG 50.630 -999.990 ... R4 1993 06 01 12 41 00 -40.6800 144.6800 97.00 94.00 3.00 40663 CGO 1993 04 20 03 30 00 6548-66 P co CCGG 50.530 -999.990 ... R4 1993 06 01 12 57 00 -40.6800 144.6800 97.00 94.00 3.00 40664 CGO 1993 04 27 02 14 00 6753-66 P co CCGG 56.650 -999.990 .XI R4 1993 06 01 12 08 00 -40.6800 144.6800 97.00 94.00 3.00 40665 CGO 1993 04 27 02 14 00 6754-66 P co CCGG 55.870 -999.990 .X. R4 1993 06 01 12 24 00 -40.6800 144.6800 97.00 94.00 3.00 40666 CGO 1993 05 03 02 40 00 6377-66 P co CCGG 51.860 -999.990 ... R4 1993 06 16 11 09 00 -40.6800 144.6800 97.00 94.00 3.00 40667 CGO 1993 05 03 02 40 00 6378-66 P co CCGG 50.640 -999.990 ... R4 1993 06 16 11 25 00 -40.6800 144.6800 97.00 94.00 3.00 40668 CGO 1993 05 11 01 55 00 6807-66 P co CCGG 53.080 -999.990 ..I R4 1993 06 16 12 13 00 -40.6800 144.6800 97.00 94.00 3.00 40669 CGO 1993 05 11 01 55 00 6808-66 P co CCGG 51.790 -999.990 ... R4 1993 06 16 12 30 00 -40.6800 144.6800 97.00 94.00 3.00 40670 CGO 1993 05 17 03 37 00 6177-66 P co CCGG 53.860 -999.990 ... R4 1993 06 23 12 15 00 -40.6800 144.6800 97.00 94.00 3.00 40671 CGO 1993 05 17 03 37 00 6178-66 P co CCGG 52.600 -999.990 ... R4 1993 06 23 12 31 00 -40.6800 144.6800 97.00 94.00 3.00 40672 CGO 1993 05 25 02 18 00 6201-66 P co CCGG 53.540 -999.990 ..I R4 1993 06 23 11 10 00 -40.6800 144.6800 97.00 94.00 3.00 40673 CGO 1993 05 25 02 18 00 6202-66 P co CCGG 51.870 -999.990 ... R4 1993 06 23 11 26 00 -40.6800 144.6800 97.00 94.00 3.00 40674 CGO 1993 06 07 04 59 00 6633-66 P co CCGG 54.310 -999.990 ... R4 1993 07 29 12 13 00 -40.6800 144.6800 97.00 94.00 3.00 40675 CGO 1993 06 07 04 59 00 6634-66 P co CCGG 55.560 -999.990 ... R4 1993 07 29 12 29 00 -40.6800 144.6800 97.00 94.00 3.00 40676 CGO 1993 06 21 02 19 00 6163-66 P co CCGG 57.540 -999.990 ..I R4 1993 07 29 15 47 00 -40.6800 144.6800 97.00 94.00 3.00 40677 CGO 1993 06 21 02 19 00 6164-66 P co CCGG 57.990 -999.990 ... R4 1993 07 29 16 03 00 -40.6800 144.6800 97.00 94.00 3.00 40678 CGO 1993 07 16 01 15 00 6375-66 P co CCGG 59.580 -999.990 ..I R4 1993 09 09 09 52 00 -40.6800 144.6800 97.00 94.00 3.00 40679 CGO 1993 07 16 01 15 00 6376-66 P co CCGG 59.930 -999.990 ... R4 1993 09 09 10 08 00 -40.6800 144.6800 97.00 94.00 3.00 40680 CGO 1993 07 26 03 20 00 6399-66 P co CCGG 63.990 -999.990 ... R4 1993 09 09 08 48 00 -40.6800 144.6800 97.00 94.00 3.00 40681 CGO 1993 07 26 03 20 00 6400-66 P co CCGG 62.320 -999.990 ... R4 1993 09 09 09 04 00 -40.6800 144.6800 97.00 94.00 3.00 40682 CGO 1993 08 03 02 14 00 6221-66 P co CCGG 63.160 -999.990 ..I R4 1993 09 09 10 24 00 -40.6800 144.6800 97.00 94.00 3.00 40683 CGO 1993 08 03 02 14 00 6222-66 P co CCGG 61.940 -999.990 ... R4 1993 09 09 10 40 00 -40.6800 144.6800 97.00 94.00 3.00 40684 CGO 1993 08 11 01 51 00 6443-66 P co CCGG 65.100 -999.990 ... R4 1993 09 09 12 43 00 -40.6800 144.6800 97.00 94.00 3.00 40685 CGO 1993 08 11 01 51 00 6444-66 P co CCGG 66.510 -999.990 ... R4 1993 09 09 12 59 00 -40.6800 144.6800 97.00 94.00 3.00 40686 CGO 1993 09 02 05 56 00 6583-66 P co CCGG 68.360 -999.990 ... R4 1993 10 15 12 46 00 -40.6800 144.6800 97.00 94.00 3.00 40687 CGO 1993 09 02 05 56 00 6584-66 P co CCGG 68.800 -999.990 ... R4 1993 10 15 13 02 00 -40.6800 144.6800 97.00 94.00 3.00 40688 CGO 1993 09 09 03 25 00 6043-66 P co CCGG 71.520 -999.990 ..I R4 1993 10 15 12 14 00 -40.6800 144.6800 97.00 94.00 3.00 40689 CGO 1993 09 09 03 25 00 6044-66 P co CCGG 70.970 -999.990 ... R4 1993 10 15 12 30 00 -40.6800 144.6800 97.00 94.00 3.00 40690 CGO 1993 09 20 02 37 00 6247-66 P co CCGG 68.960 -999.990 ... R4 1993 11 10 13 43 00 -40.6800 144.6800 97.00 94.00 3.00 40691 CGO 1993 09 20 02 37 00 6248-66 P co CCGG 68.080 -999.990 ... R4 1993 11 10 13 59 00 -40.6800 144.6800 97.00 94.00 3.00 40692 CGO 1993 10 04 01 59 00 6797-66 P co CCGG 70.870 -999.990 ..I R4 1993 11 10 15 23 00 -40.6800 144.6800 97.00 94.00 3.00 40693 CGO 1993 10 04 01 59 00 6798-66 P co CCGG 70.240 -999.990 ... R4 1993 11 10 15 39 00 -40.6800 144.6800 97.00 94.00 3.00 40694 CGO 1993 10 06 02 12 00 6687-66 P co CCGG 82.260 -999.990 .X. R4 1993 11 12 09 17 00 -40.6800 144.6800 97.00 94.00 3.00 40695 CGO 1993 10 06 02 12 00 6688-66 P co CCGG 80.880 -999.990 .X. R4 1993 11 12 09 33 00 -40.6800 144.6800 97.00 94.00 3.00 40696 CGO 1993 10 11 00 43 00 6121-66 P co CCGG 69.730 -999.990 ..I R4 1993 11 12 09 49 00 -40.6800 144.6800 97.00 94.00 3.00 40697 CGO 1993 10 11 00 43 00 6122-66 P co CCGG 69.290 -999.990 ... R4 1993 11 12 10 04 00 -40.6800 144.6800 97.00 94.00 3.00 40698 CGO 1993 10 19 00 20 00 6397-66 P co CCGG 70.240 -999.990 ... R4 1993 11 30 10 03 00 -40.6800 144.6800 97.00 94.00 3.00 40699 CGO 1993 10 19 00 20 00 6398-66 P co CCGG 69.540 -999.990 ... R4 1993 11 30 10 19 00 -40.6800 144.6800 97.00 94.00 3.00 40700 CGO 1993 10 26 02 03 00 6045-66 P co CCGG 69.050 -999.990 ..I R4 1993 11 24 13 42 00 -40.6800 144.6800 97.00 94.00 3.00 40701 CGO 1993 10 26 02 03 00 6046-66 P co CCGG 68.040 -999.990 ... R4 1993 11 24 13 58 00 -40.6800 144.6800 97.00 94.00 3.00 40702 CGO 1993 11 15 02 17 00 6041-66 P co CCGG 66.420 -999.990 ..I R4 1994 01 19 14 30 00 -40.6800 144.6800 97.00 94.00 3.00 40703 CGO 1993 11 15 02 17 00 6042-66 P co CCGG 65.060 -999.990 ... R4 1994 01 19 14 46 00 -40.6800 144.6800 97.00 94.00 3.00 40704 CGO 1993 11 22 03 43 00 6073-66 P co CCGG 62.880 -999.990 ... R4 1994 01 19 15 02 00 -40.6800 144.6800 97.00 94.00 3.00 40705 CGO 1993 11 22 03 43 00 6074-66 P co CCGG 62.010 -999.990 ... R4 1994 01 19 15 18 00 -40.6800 144.6800 97.00 94.00 3.00 40706 CGO 1993 12 15 04 37 00 6209-66 P co CCGG 53.780 -999.990 ..I R4 1994 02 02 09 57 00 -40.6800 144.6800 97.00 94.00 3.00 40707 CGO 1993 12 15 04 37 00 6210-66 P co CCGG 52.860 -999.990 ... R4 1994 02 02 10 13 00 -40.6800 144.6800 97.00 94.00 3.00 40708 CGO 1993 12 17 03 45 00 6535-66 P co CCGG 53.700 -999.990 ... R4 1994 02 02 10 29 00 -40.6800 144.6800 97.00 94.00 3.00 40709 CGO 1993 12 17 03 45 00 6536-66 P co CCGG 53.120 -999.990 ... R4 1994 02 02 10 45 00 -40.6800 144.6800 97.00 94.00 3.00 40710 CGO 1993 12 20 00 46 00 6229-66 P co CCGG 56.300 -999.990 ..I R4 1994 03 08 16 25 00 -40.6800 144.6800 97.00 94.00 3.00 40711 CGO 1993 12 20 00 46 00 6230-66 P co CCGG 54.660 -999.990 ... R4 1994 03 08 16 41 00 -40.6800 144.6800 97.00 94.00 3.00 40712 CGO 1993 12 30 01 52 00 6313-66 P co CCGG 52.670 -999.990 ... R4 1994 03 08 16 57 00 -40.6800 144.6800 97.00 94.00 3.00 40713 CGO 1993 12 30 01 52 00 6314-66 P co CCGG 51.510 -999.990 ... R4 1994 03 08 17 13 00 -40.6800 144.6800 97.00 94.00 3.00 40714 CGO 1994 01 13 02 27 00 6647-66 P co CCGG 52.240 -999.990 P.I R4 1994 03 08 15 50 00 -40.6800 144.6800 97.00 94.00 3.00 40715 CGO 1994 01 13 02 27 00 6648-66 P co CCGG 58.000 -999.990 P.. R4 1994 03 08 16 09 00 -40.6800 144.6800 97.00 94.00 3.00 40716 CGO 1994 01 18 05 15 00 6300-66 P co CCGG 50.010 -999.990 ... R4 1994 03 10 08 24 00 -40.6800 144.6800 97.00 94.00 3.00 40717 CGO 1994 01 27 05 16 00 6591-66 P co CCGG 49.170 -999.990 ..I R4 1994 03 18 11 13 00 -40.6800 144.6800 97.00 94.00 3.00 40718 CGO 1994 01 27 05 16 00 6592-66 P co CCGG 47.140 -999.990 ... R4 1994 03 18 11 29 00 -40.6800 144.6800 97.00 94.00 3.00 40719 CGO 1994 02 15 05 07 00 6105-66 P co CCGG 44.310 -999.990 ... R4 1994 03 18 08 51 00 -40.6800 144.6800 97.00 94.00 3.00 40720 CGO 1994 02 15 05 07 00 6106-66 P co CCGG 44.480 -999.990 ... R4 1994 03 18 09 07 00 -40.6800 144.6800 97.00 94.00 3.00 40721 CGO 1994 02 18 05 18 00 6555-66 P co CCGG 45.680 -999.990 ... R4 1994 04 15 12 26 00 -40.6800 144.6800 97.00 94.00 3.00 40722 CGO 1994 02 18 05 18 00 6556-66 P co CCGG 45.750 -999.990 ... R4 1994 04 15 12 42 00 -40.6800 144.6800 97.00 94.00 3.00 40723 CGO 1994 02 25 01 28 00 6399-66 P co CCGG 49.380 -999.990 ..I R4 1994 04 15 14 20 00 -40.6800 144.6800 97.00 94.00 3.00 40724 CGO 1994 02 25 01 28 00 6400-66 P co CCGG 47.530 -999.990 ... R4 1994 04 15 14 36 00 -40.6800 144.6800 97.00 94.00 3.00 40725 CGO 1994 03 03 04 12 00 6143-66 P co CCGG 46.700 -999.990 ... R4 1994 04 19 08 12 00 -40.6800 144.6800 97.00 94.00 3.00 40726 CGO 1994 03 14 03 40 00 6657-66 P co CCGG 46.560 -999.990 ..I R4 1994 04 19 07 40 00 -40.6800 144.6800 97.00 94.00 3.00 40727 CGO 1994 03 14 03 40 00 6658-66 P co CCGG 45.830 -999.990 ... R4 1994 04 19 07 56 00 -40.6800 144.6800 97.00 94.00 3.00 40728 CGO 1994 04 02 02 36 00 6817-66 P co CCGG 50.430 -999.990 ... R4 1994 05 12 14 00 00 -40.6800 144.6800 97.00 94.00 3.00 40729 CGO 1994 04 02 02 36 00 6818-66 P co CCGG 48.080 -999.990 ... R4 1994 05 12 14 16 00 -40.6800 144.6800 97.00 94.00 3.00 40730 CGO 1994 04 07 01 28 00 6259-66 P co CCGG 47.840 -999.990 ..I R4 1994 05 12 14 32 00 -40.6800 144.6800 97.00 94.00 3.00 40731 CGO 1994 04 07 01 28 00 6260-66 P co CCGG 46.930 -999.990 ... R4 1994 05 12 14 48 00 -40.6800 144.6800 97.00 94.00 3.00 40732 CGO 1994 04 14 05 03 00 6381-66 P co CCGG 53.230 -999.990 ..I R4 1994 06 06 11 30 00 -40.6800 144.6800 97.00 94.00 3.00 40733 CGO 1994 04 14 05 03 00 6382-66 P co CCGG 52.480 -999.990 ... R4 1994 06 06 11 46 00 -40.6800 144.6800 97.00 94.00 3.00 40734 CGO 1994 04 28 06 36 00 6547-66 P co CCGG 48.930 -999.990 ... R4 1994 06 06 12 02 00 -40.6800 144.6800 97.00 94.00 3.00 40735 CGO 1994 04 28 06 36 00 6548-66 P co CCGG 48.740 -999.990 ... R4 1994 06 06 12 18 00 -40.6800 144.6800 97.00 94.00 3.00 40736 CGO 1994 05 12 06 00 00 6805-66 P co CCGG 53.160 -999.990 ... R4 1994 06 17 15 04 00 -40.6800 144.6800 97.00 94.00 3.00 40737 CGO 1994 05 12 06 00 00 6806-66 P co CCGG 53.440 -999.990 ..I R4 1994 06 17 15 20 00 -40.6800 144.6800 97.00 94.00 3.00 40738 CGO 1994 05 18 06 11 00 6279-66 P co CCGG 52.890 -999.990 ... R4 1994 06 17 14 32 00 -40.6800 144.6800 97.00 94.00 3.00 40739 CGO 1994 05 18 06 11 00 6280-66 P co CCGG 51.750 -999.990 ... R4 1994 06 17 14 48 00 -40.6800 144.6800 97.00 94.00 3.00 40740 CGO 1994 05 26 05 50 00 6179-66 P co CCGG 57.660 -999.990 ... R4 1994 07 15 16 16 00 -40.6800 144.6800 97.00 94.00 3.00 40741 CGO 1994 05 26 05 50 00 6180-66 P co CCGG 57.680 -999.990 ..I R4 1994 07 15 16 32 00 -40.6800 144.6800 97.00 94.00 3.00 40742 CGO 1994 06 06 04 37 00 6545-66 P co CCGG 57.910 -999.990 ... R4 1994 07 18 10 23 00 -40.6800 144.6800 97.00 94.00 3.00 40743 CGO 1994 06 06 04 37 00 6546-66 P co CCGG 57.670 -999.990 ... R4 1994 07 18 10 39 00 -40.6800 144.6800 97.00 94.00 3.00 40744 CGO 1994 06 15 03 14 00 6189-66 P co CCGG 57.670 -999.990 ..I R4 1994 08 10 14 25 00 -40.6800 144.6800 97.00 94.00 3.00 40745 CGO 1994 06 15 03 14 00 6190-66 P co CCGG 57.080 -999.990 ... R4 1994 08 10 14 41 00 -40.6800 144.6800 97.00 94.00 3.00 40746 CGO 1994 06 30 23 59 00 6852-66 P co CCGG 61.650 -999.990 ... R4 1994 08 10 14 57 00 -40.6800 144.6800 97.00 94.00 3.00 40747 CGO 1994 07 07 01 49 00 6215-66 P co CCGG 69.530 -999.990 .X. R4 1994 08 15 13 31 00 -40.6800 144.6800 97.00 94.00 3.00 40748 CGO 1994 07 07 01 49 00 6216-66 P co CCGG 69.810 -999.990 .XI R4 1994 08 15 13 47 00 -40.6800 144.6800 97.00 94.00 3.00 40749 CGO 1994 07 13 02 25 00 6595-66 P co CCGG 60.790 -999.990 ... R4 1994 08 15 15 08 00 -40.6800 144.6800 97.00 94.00 3.00 40750 CGO 1994 07 13 02 25 00 6596-66 P co CCGG 59.990 -999.990 ... R4 1994 08 15 15 24 00 -40.6800 144.6800 97.00 94.00 3.00 40751 CGO 1994 07 18 01 14 00 6289-66 P co CCGG 60.260 -999.990 ... R4 1994 08 31 12 49 00 -40.6800 144.6800 97.00 94.00 3.00 40752 CGO 1994 07 18 01 14 00 6290-66 P co CCGG 60.180 -999.990 ..I R4 1994 08 31 13 05 00 -40.6800 144.6800 97.00 94.00 3.00 40753 CGO 1994 07 25 01 26 00 6409-66 P co CCGG 65.900 -999.990 ... R4 1994 08 31 13 21 00 -40.6800 144.6800 97.00 94.00 3.00 40754 CGO 1994 07 25 01 26 00 6410-66 P co CCGG 63.100 -999.990 ... R4 1994 08 31 13 36 00 -40.6800 144.6800 97.00 94.00 3.00 40755 CGO 1994 08 01 01 13 00 6787-66 P co CCGG 79.920 -999.990 .X. R4 1994 08 30 14 31 00 -40.6800 144.6800 97.00 94.00 3.00 40756 CGO 1994 08 01 01 13 00 6788-66 P co CCGG 77.960 -999.990 .XI R4 1994 08 30 14 47 00 -40.6800 144.6800 97.00 94.00 3.00 40757 CGO 1994 08 08 01 17 00 6095-66 P co CCGG 62.760 -999.990 ... R4 1994 08 30 15 39 00 -40.6800 144.6800 97.00 94.00 3.00 40758 CGO 1994 08 08 01 17 00 6096-66 P co CCGG 62.020 -999.990 ... R4 1994 08 30 15 55 00 -40.6800 144.6800 97.00 94.00 3.00 40759 CGO 1994 08 15 00 46 00 6021-66 P co CCGG 64.780 -999.990 ... R4 1994 10 14 08 45 00 -40.6800 144.6800 97.00 94.00 3.00 40760 CGO 1994 08 15 00 46 00 6022-66 P co CCGG 65.070 -999.990 ..I R4 1994 10 14 09 01 00 -40.6800 144.6800 97.00 94.00 3.00 40761 CGO 1994 08 23 01 16 00 6391-66 P co CCGG 67.200 -999.990 ... R4 1994 10 14 09 17 00 -40.6800 144.6800 97.00 94.00 3.00 40762 CGO 1994 08 23 01 16 00 6392-66 P co CCGG 66.800 -999.990 ... R4 1994 10 14 09 33 00 -40.6800 144.6800 97.00 94.00 3.00 40763 CGO 1994 08 29 02 17 00 6047-66 P co CCGG 67.100 -999.990 ... R4 1994 10 14 11 38 00 -40.6800 144.6800 97.00 94.00 3.00 40764 CGO 1994 08 29 02 17 00 6048-66 P co CCGG 66.060 -999.990 ..I R4 1994 10 14 11 54 00 -40.6800 144.6800 97.00 94.00 3.00 40765 CGO 1994 09 05 01 52 00 6625-66 P co CCGG 66.440 -999.990 ... R4 1994 10 20 08 54 00 -40.6800 144.6800 97.00 94.00 3.00 40766 CGO 1994 09 16 03 26 00 6729-66 P co CCGG 69.030 -999.990 ..I R4 1994 10 20 10 16 00 -40.6800 144.6800 97.00 94.00 3.00 40767 CGO 1994 09 16 03 26 00 6730-66 P co CCGG 68.850 -999.990 ... R4 1994 10 20 10 33 00 -40.6800 144.6800 97.00 94.00 3.00 40768 CGO 1994 09 19 01 28 00 6037-66 P co CCGG 70.460 -999.990 ... R4 1994 11 08 15 11 00 -40.6800 144.6800 97.00 94.00 3.00 40769 CGO 1994 09 19 01 28 00 6038-66 P co CCGG 70.680 -999.990 ..I R4 1994 11 08 15 27 00 -40.6800 144.6800 97.00 94.00 3.00 40770 CGO 1994 09 26 01 53 00 6113-66 P co CCGG 73.920 -999.990 ... R4 1994 11 08 15 43 00 -40.6800 144.6800 97.00 94.00 3.00 40771 CGO 1994 09 26 01 53 00 6114-66 P co CCGG 74.200 -999.990 ... R4 1994 11 08 16 00 00 -40.6800 144.6800 97.00 94.00 3.00 40772 CGO 1994 10 05 00 58 00 6665-66 P co CCGG 74.800 -999.990 ... R4 1994 11 02 13 29 00 -40.6800 144.6800 97.00 94.00 3.00 40773 CGO 1994 10 05 00 58 00 6666-66 P co CCGG 74.120 -999.990 ... R4 1994 11 02 13 45 00 -40.6800 144.6800 97.00 94.00 3.00 40774 CGO 1994 10 11 02 15 00 6023-66 P co CCGG 72.070 -999.990 ... R4 1994 11 02 16 37 00 -40.6800 144.6800 97.00 94.00 3.00 40775 CGO 1994 10 11 02 15 00 6024-66 P co CCGG 72.120 -999.990 ..I R4 1994 11 02 16 53 00 -40.6800 144.6800 97.00 94.00 3.00 40776 CGO 1994 10 18 04 48 00 6605-66 P co CCGG 72.410 -999.990 ... R4 1994 11 28 14 25 00 -40.6800 144.6800 97.00 94.00 3.00 40777 CGO 1994 10 18 04 48 00 6606-66 P co CCGG 71.240 -999.990 ... R4 1994 11 28 14 41 00 -40.6800 144.6800 97.00 94.00 3.00 40778 CGO 1994 10 26 03 36 00 6469-66 P co CCGG 78.610 -999.990 ..I R4 1994 11 28 14 58 00 -40.6800 144.6800 97.00 94.00 3.00 40779 CGO 1994 10 26 03 36 00 6470-66 P co CCGG 77.000 -999.990 ... R4 1994 11 28 15 14 00 -40.6800 144.6800 97.00 94.00 3.00 40780 CGO 1994 11 03 00 59 00 6099-66 P co CCGG 72.090 -999.990 ... R4 1994 12 16 15 23 00 -40.6800 144.6800 97.00 94.00 3.00 40781 CGO 1994 11 03 00 59 00 6100-66 P co CCGG 71.160 -999.990 ... R4 1994 12 16 15 39 00 -40.6800 144.6800 97.00 94.00 3.00 40782 CGO 1994 11 08 03 25 00 6341-66 P co CCGG 67.920 -999.990 ... R4 1994 12 16 09 14 00 -40.6800 144.6800 97.00 94.00 3.00 40783 CGO 1994 11 08 03 25 00 6342-66 P co CCGG 67.630 -999.990 ..I R4 1994 12 16 09 30 00 -40.6800 144.6800 97.00 94.00 3.00 40784 CGO 1994 11 15 03 04 00 6777-66 P co CCGG 68.990 -999.990 ... R4 1994 12 21 16 09 00 -40.6800 144.6800 97.00 94.00 3.00 40785 CGO 1994 11 15 03 04 00 6778-66 P co CCGG 67.230 -999.990 ... R4 1994 12 21 16 25 00 -40.6800 144.6800 97.00 94.00 3.00 40786 CGO 1994 11 21 00 49 00 6057-66 P co CCGG 66.580 -999.990 ... R4 1994 12 21 14 36 00 -40.6800 144.6800 97.00 94.00 3.00 40787 CGO 1994 11 21 00 49 00 6058-66 P co CCGG 66.170 -999.990 ..I R4 1994 12 21 14 52 00 -40.6800 144.6800 97.00 94.00 3.00 40788 CGO 1994 12 08 00 03 00 6115-66 P co CCGG 62.290 -999.990 ... R4 1995 02 01 16 30 00 -40.6800 144.6800 97.00 94.00 3.00 40789 CGO 1994 12 14 01 43 00 6143-66 P co CCGG 59.910 -999.990 ..I R4 1995 02 01 09 53 00 -40.6800 144.6800 97.00 94.00 3.00 40790 CGO 1994 12 14 01 43 00 6144-66 P co CCGG 60.890 -999.990 ... R4 1995 02 01 10 09 00 -40.6800 144.6800 97.00 94.00 3.00 40791 CGO 1994 12 21 03 43 00 6129-66 P co CCGG 58.800 -999.990 ... R4 1995 02 01 13 08 00 -40.6800 144.6800 97.00 94.00 3.00 40792 CGO 1994 12 21 03 43 00 6130-66 P co CCGG 57.120 -999.990 ... R4 1995 02 01 13 25 00 -40.6800 144.6800 97.00 94.00 3.00 40793 CGO 1994 12 28 23 38 00 6407-66 P co CCGG 56.690 -999.990 ..I R4 1995 02 01 14 14 00 -40.6800 144.6800 97.00 94.00 3.00 40794 CGO 1994 12 28 23 38 00 6408-66 P co CCGG 57.690 -999.990 ... R4 1995 02 01 14 30 00 -40.6800 144.6800 97.00 94.00 3.00 40795 CGO 1995 01 12 01 32 00 6605-66 P co CCGG 55.800 -999.990 ... R4 1995 03 23 10 19 00 -40.6800 144.6800 97.00 94.00 3.00 40796 CGO 1995 01 12 01 32 00 6606-66 P co CCGG 54.230 -999.990 ... R4 1995 03 23 10 35 00 -40.6800 144.6800 97.00 94.00 3.00 40797 CGO 1995 01 30 05 10 00 6007-66 P co CCGG 58.900 -999.990 .XI R4 1995 03 23 11 57 00 -40.6800 144.6800 97.00 94.00 3.00 40798 CGO 1995 01 30 05 10 00 6008-66 P co CCGG 55.920 -999.990 .X. R4 1995 03 23 12 13 00 -40.6800 144.6800 97.00 94.00 3.00 40799 CGO 1995 02 08 03 47 00 6763-66 P co CCGG 49.220 -999.990 ..I R4 1995 04 10 12 01 00 -40.6800 144.6800 97.00 94.00 3.00 40800 CGO 1995 02 08 03 47 00 6764-66 P co CCGG 48.200 -999.990 ... R4 1995 04 10 12 17 00 -40.6800 144.6800 97.00 94.00 3.00 40801 CGO 1995 02 17 02 52 00 6161-66 P co CCGG 45.800 -999.990 ... R4 1995 04 10 11 28 00 -40.6800 144.6800 97.00 94.00 3.00 40802 CGO 1995 02 17 02 52 00 6162-66 P co CCGG 45.260 -999.990 ... R4 1995 04 10 11 44 00 -40.6800 144.6800 97.00 94.00 3.00 40803 CGO 1995 02 22 02 30 00 6907-66 P co CCGG 46.340 -999.990 ... R4 1995 04 19 10 50 00 -40.6800 144.6800 97.00 94.00 3.00 40804 CGO 1995 02 22 02 30 00 6908-66 P co CCGG 46.940 -999.990 ... R4 1995 04 19 11 07 00 -40.6800 144.6800 97.00 94.00 3.00 40805 CGO 1995 03 09 00 07 00 6273-66 P co CCGG 46.060 -999.990 ..I R4 1995 04 19 08 04 00 -40.6800 144.6800 97.00 94.00 3.00 40806 CGO 1995 03 09 00 07 00 6274-66 P co CCGG -999.990 -999.990 *.. R4 1995 04 19 08 20 00 -40.6800 144.6800 97.00 94.00 3.00 40807 CGO 1995 03 13 04 08 00 6851-66 P co CCGG 47.740 -999.990 ..I R4 1995 04 18 17 25 00 -40.6800 144.6800 97.00 94.00 3.00 40808 CGO 1995 03 13 04 08 00 6852-66 P co CCGG 45.820 -999.990 ... R4 1995 04 18 17 41 00 -40.6800 144.6800 97.00 94.00 3.00 40809 CGO 1995 03 20 04 56 00 6911-66 P co CCGG 49.720 -999.990 ... R4 1995 05 12 09 43 00 -40.6800 144.6800 97.00 94.00 3.00 40810 CGO 1995 03 20 04 56 00 6912-66 P co CCGG 46.910 -999.990 ... R4 1995 05 12 10 00 00 -40.6800 144.6800 97.00 94.00 3.00 40811 CGO 1995 03 27 04 12 00 6291-66 P co CCGG 45.000 -999.990 ..I R4 1995 05 12 12 24 00 -40.6800 144.6800 97.00 94.00 3.00 40812 CGO 1995 03 27 04 12 00 6292-66 P co CCGG 44.070 -999.990 ... R4 1995 05 12 12 40 00 -40.6800 144.6800 97.00 94.00 3.00 40813 CGO 1995 04 05 05 15 00 6349-66 P co CCGG 44.930 -999.990 ... R4 1995 06 27 10 50 00 -40.6800 144.6800 97.00 94.00 3.00 40814 CGO 1995 04 05 05 15 00 6350-66 P co CCGG 45.210 -999.990 ... R4 1995 06 27 11 06 00 -40.6800 144.6800 97.00 94.00 3.00 40815 CGO 1995 04 12 04 27 00 6785-66 P co CCGG 51.550 -999.990 ..I R4 1995 06 27 10 17 00 -40.6800 144.6800 97.00 94.00 3.00 40816 CGO 1995 04 12 04 27 00 6786-66 P co CCGG 51.000 -999.990 ... R4 1995 06 27 10 33 00 -40.6800 144.6800 97.00 94.00 3.00 40817 CGO 1995 04 19 02 20 00 6091-66 P co CCGG 48.640 -999.990 ... R4 1995 06 09 15 02 00 -40.6800 144.6800 97.00 94.00 3.00 40818 CGO 1995 04 19 02 20 00 6092-66 P co CCGG 48.860 -999.990 ... R4 1995 06 09 15 18 00 -40.6800 144.6800 97.00 94.00 3.00 40819 CGO 1995 04 24 02 45 00 6595-66 P co CCGG 49.870 -999.990 ..I R4 1995 06 09 14 29 00 -40.6800 144.6800 97.00 94.00 3.00 40820 CGO 1995 04 24 02 45 00 6596-66 P co CCGG 48.710 -999.990 ... R4 1995 06 09 14 46 00 -40.6800 144.6800 97.00 94.00 3.00 40821 CGO 1995 05 05 05 33 00 6893-66 P co CCGG 51.900 -999.990 ..I R4 1995 06 27 11 22 00 -40.6800 144.6800 97.00 94.00 3.00 40822 CGO 1995 05 05 05 33 00 6894-66 P co CCGG 51.690 -999.990 ... R4 1995 06 27 11 38 00 -40.6800 144.6800 97.00 94.00 3.00 40823 CGO 1995 05 15 05 48 00 6061-66 P co CCGG 50.950 -999.990 ... R4 1995 06 27 09 45 00 -40.6800 144.6800 97.00 94.00 3.00 40824 CGO 1995 05 15 05 48 00 6062-66 P co CCGG 51.330 -999.990 ... R4 1995 06 27 10 01 00 -40.6800 144.6800 97.00 94.00 3.00 40825 CGO 1995 05 26 01 49 00 6605-66 P co CCGG 54.140 -999.990 ..I R7 1995 08 09 10 31 00 -40.6800 144.6800 97.00 94.00 3.00 40826 CGO 1995 05 26 01 49 00 6606-66 P co CCGG 52.470 -999.990 ... R7 1995 08 09 10 47 00 -40.6800 144.6800 97.00 94.00 3.00 40827 CGO 1995 05 31 04 19 00 6007-66 P co CCGG 54.540 -999.990 P.. R7 1995 08 09 08 54 00 -40.6800 144.6800 97.00 94.00 3.00 40828 CGO 1995 05 31 04 19 00 6008-66 P co CCGG 57.530 -999.990 P.. R7 1995 08 09 09 10 00 -40.6800 144.6800 97.00 94.00 3.00 40829 CGO 1995 06 11 03 59 00 6689-66 P co CCGG 58.440 -999.990 ... R7 1995 08 29 14 00 00 -40.6800 144.6800 97.00 94.00 3.00 40830 CGO 1995 06 11 03 59 00 6690-66 P co CCGG 58.590 -999.990 ... R7 1995 08 29 14 16 00 -40.6800 144.6800 97.00 94.00 3.00 40831 CGO 1995 06 13 04 29 00 6247-66 P co CCGG 56.060 -999.990 ... R7 1995 08 09 09 27 00 -40.6800 144.6800 97.00 94.00 3.00 40832 CGO 1995 06 13 04 29 00 6248-66 P co CCGG 54.800 -999.990 ... R7 1995 08 09 09 43 00 -40.6800 144.6800 97.00 94.00 3.00 40833 CGO 1995 06 16 05 22 00 6863-66 P co CCGG 54.000 -999.990 ..I R7 1995 08 09 09 59 00 -40.6800 144.6800 97.00 94.00 3.00 40834 CGO 1995 06 16 05 22 00 6864-66 P co CCGG 53.880 -999.990 ... R7 1995 08 09 10 15 00 -40.6800 144.6800 97.00 94.00 3.00 40835 CGO 1995 06 20 04 32 00 6851-66 P co CCGG 56.910 -999.990 ..I R7 1995 08 22 14 52 00 -40.6800 144.6800 97.00 94.00 3.00 40836 CGO 1995 06 20 04 32 00 6852-66 P co CCGG 56.450 -999.990 ... R7 1995 08 22 15 08 00 -40.6800 144.6800 97.00 94.00 3.00 40837 CGO 1995 06 29 05 58 00 6445-66 P co CCGG 55.600 -999.990 ... R7 1995 08 22 14 19 00 -40.6800 144.6800 97.00 94.00 3.00 40838 CGO 1995 07 03 02 40 00 6039-66 P co CCGG 57.270 -999.990 ..I R7 1995 08 29 13 28 00 -40.6800 144.6800 97.00 94.00 3.00 40839 CGO 1995 07 03 02 40 00 6040-66 P co CCGG 57.040 -999.990 ... R7 1995 08 29 13 44 00 -40.6800 144.6800 97.00 94.00 3.00 40840 CGO 1995 07 24 05 15 00 6471-66 P co CCGG 59.140 -999.990 ..I R7 1995 08 31 12 48 00 -40.6800 144.6800 97.00 94.00 3.00 40841 CGO 1995 07 24 05 15 00 6472-66 P co CCGG 60.170 -999.990 ... R7 1995 08 31 13 05 00 -40.6800 144.6800 97.00 94.00 3.00 40842 CGO 1995 08 04 06 03 00 6327-66 P co CCGG 61.880 -999.990 ... R7 1995 09 28 09 53 00 -40.6800 144.6800 97.00 94.00 3.00 40843 CGO 1995 08 04 06 03 00 6328-66 P co CCGG 60.480 -999.990 ... R7 1995 09 28 10 09 00 -40.6800 144.6800 97.00 94.00 3.00 40844 CGO 1995 08 17 05 59 00 6739-66 P co CCGG 68.300 -999.990 ..I R7 1995 09 28 13 18 00 -40.6800 144.6800 97.00 94.00 3.00 40845 CGO 1995 08 17 05 59 00 6740-66 P co CCGG 67.240 -999.990 ... R7 1995 09 28 13 34 00 -40.6800 144.6800 97.00 94.00 3.00 40846 CGO 1995 08 21 04 37 00 6081-66 P co CCGG 66.960 -999.990 P.I R7 1995 11 28 08 27 00 -40.6800 144.6800 97.00 94.00 3.00 40847 CGO 1995 08 21 04 37 00 6082-66 P co CCGG 63.460 -999.990 P.. R7 1995 11 28 08 43 00 -40.6800 144.6800 97.00 94.00 3.00 40848 CGO 1995 08 31 05 17 00 6369-66 P co CCGG 73.410 -999.990 ... R7 1995 11 28 08 59 00 -40.6800 144.6800 97.00 94.00 3.00 40849 CGO 1995 08 31 05 17 00 6370-66 P co CCGG 72.660 -999.990 ... R7 1995 11 28 09 15 00 -40.6800 144.6800 97.00 94.00 3.00 40850 CGO 1995 09 06 04 48 00 6619-66 P co CCGG 67.460 -999.990 P.I R7 1995 11 24 13 35 00 -40.6800 144.6800 97.00 94.00 3.00 40851 CGO 1995 09 06 04 48 00 6620-66 P co CCGG 64.490 -999.990 P.. R7 1995 11 27 08 29 00 -40.6800 144.6800 97.00 94.00 3.00 40852 CGO 1995 09 14 01 28 00 6421-66 P co CCGG 73.410 -999.990 ... R7 1995 11 24 11 18 00 -40.6800 144.6800 97.00 94.00 3.00 40853 CGO 1995 09 14 01 28 00 6422-66 P co CCGG 72.710 -999.990 ... R7 1995 11 24 11 34 00 -40.6800 144.6800 97.00 94.00 3.00 40854 CGO 1995 09 21 03 12 00 6653-66 P co CCGG 74.780 -999.990 ... R7 1995 11 29 08 10 00 -40.6800 144.6800 97.00 94.00 3.00 40855 CGO 1995 09 21 03 12 00 6654-66 P co CCGG 75.090 -999.990 ... R7 1995 11 29 08 26 00 -40.6800 144.6800 97.00 94.00 3.00 40856 CGO 1995 10 03 02 03 00 6851-66 P co CCGG 79.310 -999.990 P.I R7 1995 11 29 11 32 00 -40.6800 144.6800 97.00 94.00 3.00 40857 CGO 1995 10 03 02 03 00 6852-66 P co CCGG 76.280 -999.990 P.. R7 1995 11 29 11 48 00 -40.6800 144.6800 97.00 94.00 3.00 40858 CGO 1995 10 11 02 59 00 6211-66 P co CCGG 72.670 -999.990 ..I R7 1995 12 12 09 33 00 -40.6800 144.6800 97.00 94.00 3.00 40859 CGO 1995 10 11 02 59 00 6212-66 P co CCGG 73.080 -999.990 ... R7 1995 12 12 09 49 00 -40.6800 144.6800 97.00 94.00 3.00 40860 CGO 1995 10 20 04 52 00 6837-66 P co CCGG 73.870 -999.990 ... R7 1995 12 12 09 00 00 -40.6800 144.6800 97.00 94.00 3.00 40861 CGO 1995 10 20 04 52 00 6838-66 P co CCGG 73.290 -999.990 ... R7 1995 12 12 09 16 00 -40.6800 144.6800 97.00 94.00 3.00 40862 CGO 1995 10 24 04 14 00 6105-66 P co CCGG 76.480 -999.990 ... R7 1996 01 05 10 10 00 -40.6800 144.6800 97.00 94.00 3.00 40863 CGO 1995 10 24 04 14 00 6106-66 P co CCGG 77.650 -999.990 ... R7 1996 01 05 10 26 00 -40.6800 144.6800 97.00 94.00 3.00 40864 CGO 1995 11 03 00 55 00 6497-66 P co CCGG 77.680 -999.990 ..I R7 1996 01 05 08 33 00 -40.6800 144.6800 97.00 94.00 3.00 40865 CGO 1995 11 03 00 55 00 6498-66 P co CCGG 76.690 -999.990 ... R7 1996 01 05 08 49 00 -40.6800 144.6800 97.00 94.00 3.00 40866 CGO 1995 11 10 05 10 00 6697-66 P co CCGG 77.910 -999.990 .X. R7 1996 01 12 09 43 00 -40.6800 144.6800 97.00 94.00 3.00 40867 CGO 1995 11 10 05 10 00 6698-66 P co CCGG 77.120 -999.990 .X. R7 1996 01 12 09 59 00 -40.6800 144.6800 97.00 94.00 3.00 40868 CGO 1995 11 23 03 56 00 6817-66 P co CCGG 74.180 -999.990 P.I R7 1996 01 12 08 38 00 -40.6800 144.6800 97.00 94.00 3.00 40869 CGO 1995 11 23 03 56 00 6818-66 P co CCGG 71.230 -999.990 P.. R7 1996 01 12 08 54 00 -40.6800 144.6800 97.00 94.00 3.00 40870 CGO 1995 12 01 04 28 00 6223-66 P co CCGG 68.380 -999.990 P.. R7 1996 03 11 12 22 00 -40.6800 144.6800 97.00 94.00 3.00 40871 CGO 1995 12 01 04 28 00 6224-66 P co CCGG 90.810 -999.990 P.. R7 1996 03 11 12 38 00 -40.6800 144.6800 97.00 94.00 3.00 40872 CGO 1995 12 26 01 35 00 6365-66 P co CCGG 57.040 -999.990 ... R7 1996 03 11 09 01 00 -40.6800 144.6800 97.00 94.00 3.00 40873 CGO 1995 12 26 01 35 00 6366-66 P co CCGG 57.270 -999.990 ..I R7 1996 03 11 09 18 00 -40.6800 144.6800 97.00 94.00 3.00 40874 CGO 1996 01 15 05 05 00 6903-66 P co CCGG 51.410 -999.990 ... R7 1996 03 11 10 45 00 -40.6800 144.6800 164.00 94.00 70.00 40875 CGO 1996 01 15 05 05 00 6904-66 P co CCGG 50.780 -999.990 ..I R7 1996 03 11 11 01 00 -40.6800 144.6800 164.00 94.00 70.00 40876 CGO 1996 01 22 02 44 00 6155-66 P co CCGG 49.920 -999.990 ... R7 1996 03 11 11 50 00 -40.6800 144.6800 164.00 94.00 70.00 40877 CGO 1996 01 22 02 44 00 6156-66 P co CCGG 49.760 -999.990 ... R7 1996 03 11 12 06 00 -40.6800 144.6800 164.00 94.00 70.00 40878 CGO 1996 01 29 00 18 00 311-91 P co CCGG 50.560 -999.990 ..I R7 1996 03 28 14 11 00 -40.6800 144.6800 164.00 94.00 70.00 40879 CGO 1996 01 29 00 18 00 312-91 P co CCGG 52.290 -999.990 ... R7 1996 03 28 14 27 00 -40.6800 144.6800 164.00 94.00 70.00 40880 CGO 1996 02 09 03 25 00 751-91 P co CCGG 45.840 -999.990 ... R7 1996 03 27 08 16 00 -40.6800 144.6800 164.00 94.00 70.00 40881 CGO 1996 02 09 03 25 00 752-91 P co CCGG 45.170 -999.990 ... R7 1996 03 27 08 32 00 -40.6800 144.6800 164.00 94.00 70.00 40882 CGO 1996 02 28 02 02 00 6831-66 P co CCGG 44.040 -999.990 ... R7 1996 04 03 10 43 00 -40.6800 144.6800 164.00 94.00 70.00 40883 CGO 1996 02 28 02 02 00 6832-66 P co CCGG 44.090 -999.990 ... R7 1996 04 03 10 59 00 -40.6800 144.6800 164.00 94.00 70.00 40884 CGO 1996 02 29 01 29 00 6452-66 P co CCGG 44.880 -999.990 ..C R7 1996 04 03 13 32 00 -40.6800 144.6800 164.00 94.00 70.00 40885 CGO 1996 03 08 02 59 00 6087-66 P co CCGG 48.450 -999.990 ..I R7 1996 04 16 09 03 00 -40.6800 144.6800 164.00 94.00 70.00 40886 CGO 1996 03 08 02 59 00 6088-66 P co CCGG 46.910 -999.990 ... R7 1996 04 16 09 20 00 -40.6800 144.6800 164.00 94.00 70.00 40887 CGO 1996 03 14 03 50 00 6371-66 P co CCGG 46.030 -999.990 ... R7 1996 04 16 12 31 00 -40.6800 144.6800 164.00 94.00 70.00 40888 CGO 1996 03 14 03 50 00 6372-66 P co CCGG 45.380 -999.990 ..C R7 1996 04 16 12 47 00 -40.6800 144.6800 164.00 94.00 70.00 40889 CGO 1996 03 18 05 30 00 6317-66 P co CCGG 44.930 -999.990 ..C R7 1996 05 06 11 43 00 -40.6800 144.6800 164.00 94.00 70.00 40890 CGO 1996 03 18 05 30 00 6318-66 P co CCGG 44.770 -999.990 ..C R7 1996 05 06 11 59 00 -40.6800 144.6800 164.00 94.00 70.00 40891 CGO 1996 04 01 05 12 00 6773-66 P co CCGG 44.880 -999.990 ..C R7 1996 05 06 11 11 00 -40.6800 144.6800 164.00 94.00 70.00 40892 CGO 1996 04 01 05 12 00 6774-66 P co CCGG 44.960 -999.990 ..C R7 1996 05 06 11 27 00 -40.6800 144.6800 164.00 94.00 70.00 40893 CGO 1996 04 16 02 04 00 6427-66 P co CCGG 45.990 -999.990 ... R7 1996 06 05 10 43 00 -40.6800 144.6800 164.00 94.00 70.00 40894 CGO 1996 04 16 02 04 00 6428-66 P co CCGG 46.250 -999.990 ... R7 1996 06 05 10 59 00 -40.6800 144.6800 164.00 94.00 70.00 40895 CGO 1996 04 26 03 29 00 6027-66 P co CCGG 48.530 -999.990 ..I R7 1996 06 05 11 16 00 -40.6800 144.6800 164.00 94.00 70.00 40896 CGO 1996 04 26 03 29 00 6028-66 P co CCGG -999.990 -999.990 *.. R7 1996 06 05 11 32 00 -40.6800 144.6800 164.00 94.00 70.00 40897 CGO 1996 05 02 03 25 00 6111-66 P co CCGG 49.330 -999.990 ... R7 1996 06 05 12 20 00 -40.6800 144.6800 164.00 94.00 70.00 40898 CGO 1996 05 02 03 25 00 6112-66 P co CCGG 48.900 -999.990 ... R7 1996 06 05 12 36 00 -40.6800 144.6800 164.00 94.00 70.00 40899 CGO 1996 05 07 05 29 00 6835-66 P co CCGG 49.030 -999.990 ..I R7 1996 06 05 11 48 00 -40.6800 144.6800 164.00 94.00 70.00 40900 CGO 1996 05 07 05 29 00 6836-66 P co CCGG 48.770 -999.990 ... R7 1996 06 05 12 04 00 -40.6800 144.6800 164.00 94.00 70.00 40901 CGO 1996 05 14 00 20 00 6797-66 P co CCGG 49.280 -999.990 ..I R7 1996 08 15 15 44 00 -40.6800 144.6800 164.00 94.00 70.00 40902 CGO 1996 05 14 00 20 00 6798-66 P co CCGG 49.530 -999.990 ... R7 1996 08 15 16 01 00 -40.6800 144.6800 164.00 94.00 70.00 40903 CGO 1996 05 20 02 06 00 6921-66 P co CCGG 50.480 -999.990 ... R7 1996 08 15 14 06 00 -40.6800 144.6800 164.00 94.00 70.00 40904 CGO 1996 05 20 02 06 00 6922-66 P co CCGG 50.760 -999.990 ... R7 1996 08 15 14 22 00 -40.6800 144.6800 164.00 94.00 70.00 40905 CGO 1996 05 28 00 37 00 6085-66 P co CCGG 51.890 -999.990 P.I R7 1996 08 14 11 49 00 -40.6800 144.6800 164.00 94.00 70.00 40906 CGO 1996 05 28 00 37 00 6086-66 P co CCGG 48.350 -999.990 P.. R7 1996 08 14 12 05 00 -40.6800 144.6800 164.00 94.00 70.00 40907 CGO 1996 06 06 03 25 00 6663-66 P co CCGG 50.780 -999.990 ... R7 1996 08 14 11 32 00 -40.6800 144.6800 164.00 94.00 70.00 40908 CGO 1996 06 20 03 25 00 6605-66 P co CCGG 56.350 -999.990 ..I R7 1996 08 14 17 49 00 -40.6800 144.6800 164.00 94.00 70.00 40910 CGO 1996 06 20 03 25 00 6606-66 P co CCGG 55.280 -999.990 ... R7 1996 08 14 18 05 00 -40.6800 144.6800 164.00 94.00 70.00 40911 CGO 1996 06 28 01 55 00 6807-66 P co CCGG 57.090 -999.990 ... R7 1996 08 14 17 17 00 -40.6800 144.6800 164.00 94.00 70.00 40912 CGO 1996 06 28 01 55 00 6808-66 P co CCGG 55.710 -999.990 ... R7 1996 08 14 17 33 00 -40.6800 144.6800 164.00 94.00 70.00 40913 CGO 1996 07 02 02 45 00 6187-66 P co CCGG 56.640 -999.990 ... R7 1996 11 06 08 54 00 -40.6800 144.6800 164.00 94.00 70.00 40914 CGO 1996 07 02 02 45 00 6188-66 P co CCGG 54.910 -999.990 ... R7 1996 11 06 09 10 00 -40.6800 144.6800 164.00 94.00 70.00 40915 CGO 1996 07 20 07 10 00 6345-66 P co CCGG 57.490 -999.990 ..I R7 1996 11 06 10 30 00 -40.6800 144.6800 164.00 94.00 70.00 40916 CGO 1996 07 20 07 10 00 6346-66 P co CCGG 56.430 -999.990 ... R7 1996 11 06 10 46 00 -40.6800 144.6800 164.00 94.00 70.00 40917 CGO 1996 07 24 01 14 00 6617-66 P co CCGG 61.210 -999.990 P.I R7 1996 11 04 16 16 00 -40.6800 144.6800 164.00 94.00 70.00 40918 CGO 1996 07 24 01 14 00 6618-66 P co CCGG 57.470 -999.990 P.. R7 1996 11 04 16 32 00 -40.6800 144.6800 164.00 94.00 70.00 40919 CGO 1996 08 01 01 12 00 6891-66 P co CCGG 57.290 -999.990 ... R7 1996 11 04 16 49 00 -40.6800 144.6800 164.00 94.00 70.00 40920 CGO 1996 08 01 01 12 00 6892-66 P co CCGG 56.070 -999.990 ... R7 1996 11 04 17 05 00 -40.6800 144.6800 164.00 94.00 70.00 40921 CGO 1996 08 08 00 30 00 6151-66 P co CCGG 59.590 -999.990 ... R7 1996 11 18 15 39 00 -40.6800 144.6800 164.00 94.00 70.00 40922 CGO 1996 08 08 00 30 00 6152-66 P co CCGG 57.440 -999.990 ... R7 1996 11 18 15 55 00 -40.6800 144.6800 164.00 94.00 70.00 40923 CGO 1996 08 14 04 58 00 6841-66 P co CCGG 60.220 -999.990 ..I R7 1996 11 18 15 07 00 -40.6800 144.6800 164.00 94.00 70.00 40924 CGO 1996 08 14 04 58 00 6842-66 P co CCGG 59.870 -999.990 ... R7 1996 11 18 15 23 00 -40.6800 144.6800 164.00 94.00 70.00 40925 CGO 1996 08 20 00 59 00 6179-66 P co CCGG 66.890 -999.990 ... R7 1996 11 18 11 54 00 -40.6800 144.6800 164.00 94.00 70.00 40926 CGO 1996 08 20 00 59 00 6180-66 P co CCGG 64.140 -999.990 ... R7 1996 11 18 12 10 00 -40.6800 144.6800 164.00 94.00 70.00 40927 CGO 1996 09 03 00 41 00 6395-66 P co CCGG 61.150 -999.990 ..I R7 1996 11 18 13 31 00 -40.6800 144.6800 164.00 94.00 70.00 40928 CGO 1996 09 03 00 41 00 6396-66 P co CCGG 60.610 -999.990 ... R7 1996 11 18 13 47 00 -40.6800 144.6800 164.00 94.00 70.00 40929 CGO 1996 09 13 05 03 00 6389-66 P co CCGG 61.940 -999.990 ..I R7 1996 11 18 12 59 00 -40.6800 144.6800 164.00 94.00 70.00 40930 CGO 1996 09 13 05 03 00 6390-66 P co CCGG 61.840 -999.990 ... R7 1996 11 18 13 15 00 -40.6800 144.6800 164.00 94.00 70.00 40931 CGO 1996 09 19 01 20 00 6565-66 P co CCGG 69.600 -999.990 ... R7 1996 11 18 12 27 00 -40.6800 144.6800 164.00 94.00 70.00 40932 CGO 1996 09 19 01 20 00 6566-66 P co CCGG 68.430 -999.990 ... R7 1996 11 18 12 43 00 -40.6800 144.6800 164.00 94.00 70.00 40933 CGO 1996 09 26 04 15 00 6060-66 P co CCGG 63.990 -999.990 ... R7 1996 11 18 14 18 00 -40.6800 144.6800 164.00 94.00 70.00 40935 CGO 1996 10 01 01 30 00 6091-66 P co CCGG 64.720 -999.990 ..I R7 1996 11 18 14 34 00 -40.6800 144.6800 164.00 94.00 70.00 40936 CGO 1996 10 01 01 30 00 6092-66 P co CCGG 62.630 -999.990 ... R7 1996 11 18 14 50 00 -40.6800 144.6800 164.00 94.00 70.00 40937 CGO 1996 10 17 01 15 00 6421-66 P co CCGG 67.760 -999.990 ... R7 1996 12 17 09 41 00 -40.6800 144.6800 164.00 94.00 70.00 40938 CGO 1996 10 17 01 15 00 6422-66 P co CCGG 65.340 -999.990 ... R7 1996 12 17 09 58 00 -40.6800 144.6800 164.00 94.00 70.00 40939 CGO 1996 10 21 01 23 00 6831-66 P co CCGG 64.920 -999.990 ..I R7 1996 12 17 10 14 00 -40.6800 144.6800 164.00 94.00 70.00 40940 CGO 1996 10 21 01 23 00 6832-66 P co CCGG 64.590 -999.990 ... R7 1996 12 17 10 30 00 -40.6800 144.6800 164.00 94.00 70.00 40941 CGO 1996 11 11 23 55 00 6437-66 P co CCGG 62.210 -999.990 ..I R7 1997 01 17 11 56 00 -40.6800 144.6800 164.00 94.00 70.00 40942 CGO 1996 11 11 23 55 00 6438-66 P co CCGG 62.070 -999.990 ..I R7 1997 01 17 12 12 00 -40.6800 144.6800 164.00 94.00 70.00 40943 CGO 1996 11 12 00 13 00 6887-66 P co CCGG 61.930 -999.990 ..I R7 1997 01 17 13 01 00 -40.6800 144.6800 164.00 94.00 70.00 40944 CGO 1996 11 12 00 13 00 6888-66 P co CCGG 62.300 -999.990 ..I R7 1997 01 17 13 17 00 -40.6800 144.6800 164.00 94.00 70.00 40945 CGO 1996 11 12 00 31 00 6311-66 P co CCGG 61.720 -999.990 ... R7 1997 01 17 14 12 00 -40.6800 144.6800 164.00 94.00 70.00 40946 CGO 1996 11 12 00 31 00 6312-66 P co CCGG 61.350 -999.990 ..I R7 1997 01 17 14 28 00 -40.6800 144.6800 164.00 94.00 70.00 40947 CGO 1996 11 12 00 31 00 6312-66 P co CCGG 60.040 -999.990 ..I R7 1997 01 17 16 36 00 -40.6800 144.6800 164.00 94.00 70.00 40947 CGO 1996 11 12 00 48 00 6469-66 P co CCGG 62.520 -999.990 ..I R7 1997 01 17 14 45 00 -40.6800 144.6800 164.00 94.00 70.00 40948 CGO 1996 11 12 00 48 00 6470-66 P co CCGG 61.450 -999.990 ..I R7 1997 01 17 15 01 00 -40.6800 144.6800 164.00 94.00 70.00 40949 CGO 1996 11 12 01 04 00 6015-66 P co CCGG 62.000 -999.990 ..I R7 1997 01 27 11 52 00 -40.6800 144.6800 164.00 94.00 70.00 40950 CGO 1996 11 12 01 04 00 6016-66 P co CCGG 60.440 -999.990 ... R7 1997 01 27 12 08 00 -40.6800 144.6800 164.00 94.00 70.00 40951 CGO 1996 11 12 01 19 00 6761-66 P co CCGG 60.950 -999.990 ..I R7 1997 01 27 10 11 00 -40.6800 144.6800 164.00 94.00 70.00 40952 CGO 1996 11 12 01 19 00 6762-66 P co CCGG 62.670 -999.990 ..I R7 1997 01 27 10 27 00 -40.6800 144.6800 164.00 94.00 70.00 40953 CGO 1996 11 12 01 37 00 6319-66 P co CCGG 60.390 -999.990 ..I R7 1997 01 27 09 38 00 -40.6800 144.6800 164.00 94.00 70.00 40954 CGO 1996 11 12 01 37 00 6320-66 P co CCGG 59.720 -999.990 ..I R7 1997 01 27 09 55 00 -40.6800 144.6800 164.00 94.00 70.00 40955 CGO 1996 11 12 02 00 00 6497-66 P co CCGG 61.440 -999.990 ... R7 1997 01 27 10 43 00 -40.6800 144.6800 164.00 94.00 70.00 40956 CGO 1996 11 12 02 00 00 6498-66 P co CCGG 62.560 -999.990 ..i R7 1997 01 27 11 00 00 -40.6800 144.6800 164.00 94.00 70.00 40957 CGO 1996 11 12 02 16 00 6011-66 P co CCGG 61.270 -999.990 ..I R7 1997 01 27 13 03 00 -40.6800 144.6800 164.00 94.00 70.00 40958 CGO 1996 11 12 02 16 00 6012-66 P co CCGG 61.290 -999.990 ..I R7 1997 01 27 13 19 00 -40.6800 144.6800 164.00 94.00 70.00 40959 CGO 1996 11 12 02 32 00 6393-66 P co CCGG 60.680 -999.990 ..I R7 1997 01 27 14 45 00 -40.6800 144.6800 164.00 94.00 70.00 40960 CGO 1996 11 12 02 32 00 6394-66 P co CCGG 60.300 -999.990 ... R7 1997 01 27 15 01 00 -40.6800 144.6800 164.00 94.00 70.00 40961 CGO 1996 11 12 03 03 00 6619-66 P co CCGG 61.620 -999.990 ..I R7 1997 01 17 11 13 00 -40.6800 144.6800 164.00 94.00 70.00 40962 CGO 1996 11 12 03 03 00 6620-66 P co CCGG 60.820 -999.990 ..I R7 1997 01 17 11 30 00 -40.6800 144.6800 164.00 94.00 70.00 40963 CGO 1996 11 12 03 17 00 6901-66 P co CCGG 60.560 -999.990 ..I R7 1997 01 17 13 33 00 -40.6800 144.6800 164.00 94.00 70.00 40964 CGO 1996 11 12 03 17 00 6902-66 P co CCGG 61.670 -999.990 ..I R7 1997 01 17 13 49 00 -40.6800 144.6800 164.00 94.00 70.00 40965 CGO 1996 11 12 03 52 00 6537-66 P co CCGG 60.390 -999.990 ... R7 1997 01 27 15 49 00 -40.6800 144.6800 164.00 94.00 70.00 40966 CGO 1996 11 12 04 07 00 6637-66 P co CCGG 59.730 -999.990 ..I R7 1997 01 27 15 17 00 -40.6800 144.6800 164.00 94.00 70.00 40968 CGO 1996 11 12 04 07 00 6638-66 P co CCGG 60.380 -999.990 ... R7 1997 01 27 15 33 00 -40.6800 144.6800 164.00 94.00 70.00 40969 CGO 1996 11 26 02 44 00 6183-66 P co CCGG 59.030 -999.990 ... R7 1997 01 28 08 31 00 -40.6800 144.6800 164.00 94.00 70.00 40970 CGO 1996 11 26 02 44 00 6184-66 P co CCGG 59.270 -999.990 ... R7 1997 01 28 08 47 00 -40.6800 144.6800 164.00 94.00 70.00 40971 CGO 1996 12 04 04 56 00 6295-66 P co CCGG 56.650 -999.990 ..I R7 1997 01 28 09 03 00 -40.6800 144.6800 164.00 94.00 70.00 40972 CGO 1996 12 04 04 56 00 6296-66 P co CCGG 53.860 -999.990 ... R7 1997 01 28 09 20 00 -40.6800 144.6800 164.00 94.00 70.00 40973 CGO 1996 12 16 04 05 00 6371-66 P co CCGG 55.630 -999.990 ... R7 1997 05 14 10 36 00 -40.6800 144.6800 164.00 94.00 70.00 40974 CGO 1996 12 16 04 05 00 6372-66 P co CCGG 55.630 -999.990 ... R7 1997 05 14 10 53 00 -40.6800 144.6800 164.00 94.00 70.00 40975 CGO 1996 12 19 03 55 00 6407-66 P co CCGG 52.630 -999.990 ... R7 1997 05 14 11 09 00 -40.6800 144.6800 164.00 94.00 70.00 40976 CGO 1996 12 19 03 55 00 6408-66 P co CCGG 52.770 -999.990 ..I R7 1997 05 14 11 25 00 -40.6800 144.6800 164.00 94.00 70.00 40977 CGO 1996 12 31 02 43 00 6801-66 P co CCGG 48.110 -999.990 ... R7 1997 05 01 08 50 00 -40.6800 144.6800 164.00 94.00 70.00 40978 CGO 1996 12 31 02 43 00 6802-66 P co CCGG 47.580 -999.990 ... R7 1997 05 01 09 06 00 -40.6800 144.6800 164.00 94.00 70.00 40979 CGO 1997 01 08 03 03 00 6545-66 P co CCGG 47.070 -999.990 ... R7 1997 05 01 09 22 00 -40.6800 144.6800 164.00 94.00 70.00 40980 CGO 1997 01 08 03 03 00 6546-66 P co CCGG 47.290 -999.990 ..I R7 1997 05 01 09 38 00 -40.6800 144.6800 164.00 94.00 70.00 40981 CGO 1997 01 15 04 28 00 6657-66 P co CCGG 53.980 -999.990 P.I R7 1997 05 13 16 05 00 -40.6800 144.6800 164.00 94.00 70.00 40982 CGO 1997 01 15 04 28 00 6658-66 P co CCGG 49.430 -999.990 P.. R7 1997 05 13 16 21 00 -40.6800 144.6800 164.00 94.00 70.00 40983 CGO 1997 01 23 00 35 00 6921-66 P co CCGG 45.290 -999.990 ... R7 1997 04 29 11 27 00 -40.6800 144.6800 164.00 94.00 70.00 40984 CGO 1997 01 23 00 35 00 6922-66 P co CCGG 44.130 -999.990 ... R7 1997 04 29 11 43 00 -40.6800 144.6800 164.00 94.00 70.00 40985 CGO 1997 02 24 00 05 00 6367-66 P co CCGG 46.180 -999.990 P.I R7 1997 05 08 10 57 00 -40.6800 144.6800 164.00 94.00 70.00 40986 CGO 1997 02 24 00 05 00 6368-66 P co CCGG 43.390 -999.990 P.C R7 1997 05 08 11 13 00 -40.6800 144.6800 164.00 94.00 70.00 40987 CGO 1997 02 26 04 55 00 6041-66 P co CCGG 45.130 -999.990 ... R7 1997 05 08 10 25 00 -40.6800 144.6800 164.00 94.00 70.00 40988 CGO 1997 02 26 04 55 00 6042-66 P co CCGG 45.170 -999.990 ... R7 1997 05 08 10 41 00 -40.6800 144.6800 164.00 94.00 70.00 40989 CGO 1997 03 10 04 44 00 6701-66 P co CCGG 50.070 -999.990 ..I R7 1997 05 14 09 28 00 -40.6800 144.6800 164.00 94.00 70.00 40990 CGO 1997 03 10 04 44 00 6702-66 P co CCGG 50.550 -999.990 ... R7 1997 05 14 09 44 00 -40.6800 144.6800 164.00 94.00 70.00 40991 CGO 1997 03 14 01 31 00 6487-66 P co CCGG 44.940 -999.990 ... R7 1997 05 14 10 00 00 -40.6800 144.6800 164.00 94.00 70.00 40992 CGO 1997 03 14 01 31 00 6488-66 P co CCGG 45.000 -999.990 ... R7 1997 05 14 10 16 00 -40.6800 144.6800 164.00 94.00 70.00 40993 CGO 1997 03 20 04 38 00 6231-66 P co CCGG 47.530 -999.990 ..I R7 1997 05 09 17 14 00 -40.6800 144.6800 164.00 94.00 70.00 40994 CGO 1997 03 20 04 38 00 6232-66 P co CCGG 46.230 -999.990 ... R7 1997 05 09 17 30 00 -40.6800 144.6800 164.00 94.00 70.00 40995 CGO 1997 03 24 01 59 00 6469-66 P co CCGG 48.690 -999.990 ... R7 1997 05 09 16 41 00 -40.6800 144.6800 164.00 94.00 70.00 40996 CGO 1997 03 24 01 59 00 6470-66 P co CCGG 48.310 -999.990 ... R7 1997 05 09 16 58 00 -40.6800 144.6800 164.00 94.00 70.00 40997 CGO 1997 04 03 03 31 00 6263-66 P co CCGG 49.100 -999.990 ... R7 1997 05 21 16 43 00 -40.6800 144.6800 164.00 94.00 70.00 40998 CGO 1997 04 03 03 31 00 6264-66 P co CCGG 49.200 -999.990 ... R7 1997 05 21 16 59 00 -40.6800 144.6800 164.00 94.00 70.00 40999 CGO 1997 04 07 03 38 00 6629-66 P co CCGG 45.440 -999.990 ..I R7 1997 05 22 08 04 00 -40.6800 144.6800 164.00 94.00 70.00 41000 CGO 1997 04 07 03 38 00 6630-66 P co CCGG 44.710 -999.990 ..C R7 1997 05 22 08 20 00 -40.6800 144.6800 164.00 94.00 70.00 41001 CGO 1997 04 14 01 58 00 6081-66 P co CCGG 52.960 -999.990 ... R7 1997 06 04 10 45 00 -40.6800 144.6800 164.00 94.00 70.00 41002 CGO 1997 04 14 01 58 00 6082-66 P co CCGG 53.330 -999.990 ... R5 1997 06 06 10 26 00 -40.6800 144.6800 164.00 94.00 70.00 41003 CGO 1997 04 14 01 58 00 6082-66 P co CCGG 51.410 -999.990 ... R7 1997 06 04 11 01 00 -40.6800 144.6800 164.00 94.00 70.00 41003 CGO 1997 04 14 02 44 00 6784-66 P co CCGG 55.790 -999.990 ..I R5 1997 06 06 10 54 00 -40.6800 144.6800 164.00 94.00 70.00 41004 CGO 1997 04 14 02 44 00 6784-66 P co CCGG 54.900 -999.990 ..I R7 1997 06 04 11 33 00 -40.6800 144.6800 164.00 94.00 70.00 41004 CGO 1997 06 16 05 34 00 6317-66 P co CCGG 61.470 -999.990 ..I R5 1997 08 21 11 47 00 -40.6800 144.6800 164.00 94.00 70.00 41005 CGO 1997 06 16 05 34 00 6318-66 P co CCGG 62.760 -999.990 ... R5 1997 08 21 12 01 00 -40.6800 144.6800 164.00 94.00 70.00 41006 CGO 1997 07 02 04 35 00 6059-66 P co CCGG 59.200 -999.990 ... R5 1997 08 21 11 19 00 -40.6800 144.6800 164.00 94.00 70.00 41007 CGO 1997 07 02 04 35 00 6060-66 P co CCGG 57.240 -999.990 ... R5 1997 08 21 11 33 00 -40.6800 144.6800 164.00 94.00 70.00 41008 CGO 1997 07 08 05 12 00 1773-91 P co CCGG 55.930 -999.990 ... R5 1997 09 11 09 14 00 -40.6800 144.6800 164.00 94.00 70.00 41009 CGO 1997 07 08 05 12 00 1774-91 P co CCGG 56.740 -999.990 ... R5 1997 09 11 09 28 00 -40.6800 144.6800 164.00 94.00 70.00 41010 CGO 1997 07 15 05 22 00 69-91 P co CCGG 56.660 -999.990 ... R5 1997 09 11 11 33 00 -40.6800 144.6800 164.00 94.00 70.00 41011 CGO 1997 07 15 05 22 00 70-91 P co CCGG 58.150 -999.990 ... R5 1997 09 11 11 46 00 -40.6800 144.6800 164.00 94.00 70.00 41012 CGO 1997 07 15 05 32 00 4381-91 D co CCGG 56.660 -999.990 ... R5 1997 09 05 14 43 00 -40.6800 144.6800 164.00 94.00 70.00 41013 CGO 1997 07 15 05 32 00 4382-91 D co CCGG 56.820 -999.990 ..I R5 1997 09 05 14 57 00 -40.6800 144.6800 164.00 94.00 70.00 41014 CGO 1997 07 23 03 58 00 4349-91 D co CCGG 59.880 -999.990 ... R5 1997 09 08 16 03 00 -40.6800 144.6800 164.00 94.00 70.00 41015 CGO 1997 07 23 03 58 00 4350-91 D co CCGG 58.990 -999.990 ... R5 1997 09 08 16 17 00 -40.6800 144.6800 164.00 94.00 70.00 41016 CGO 1997 07 29 04 02 00 6349-66 P co CCGG 59.590 -999.990 ... R5 1997 09 18 13 11 00 -40.6800 144.6800 164.00 94.00 70.00 41017 CGO 1997 07 29 04 02 00 6350-66 P co CCGG 58.780 -999.990 ... R5 1997 09 18 13 24 00 -40.6800 144.6800 164.00 94.00 70.00 41018 CGO 1997 07 29 04 15 00 4375-91 D co CCGG 57.860 -999.990 ... R5 1997 09 12 08 38 00 -40.6800 144.6800 164.00 94.00 70.00 41019 CGO 1997 07 29 04 15 00 4376-91 D co CCGG 59.230 -999.990 ... R5 1997 09 12 08 51 00 -40.6800 144.6800 164.00 94.00 70.00 41020 CGO 1997 08 01 06 25 00 6393-66 P co CCGG 60.300 -999.990 ... R5 1997 09 18 15 02 00 -40.6800 144.6800 164.00 94.00 70.00 41021 CGO 1997 08 01 06 25 00 6394-66 P co CCGG 59.040 -999.990 ... R5 1997 09 18 15 16 00 -40.6800 144.6800 164.00 94.00 70.00 41022 CGO 1997 08 01 06 45 00 4379-91 D co CCGG 60.080 -999.990 ..I R5 1997 09 12 08 10 00 -40.6800 144.6800 164.00 94.00 70.00 41023 CGO 1997 08 01 06 45 00 4380-91 D co CCGG 57.880 -999.990 ... R5 1997 09 12 08 24 00 -40.6800 144.6800 164.00 94.00 70.00 41024 CGO 1997 08 08 05 00 00 6369-66 P co CCGG 62.120 -999.990 ... R5 1997 09 10 14 51 00 -40.6800 144.6800 164.00 94.00 70.00 41025 CGO 1997 08 08 05 00 00 6370-66 P co CCGG 60.440 -999.990 ... R5 1997 09 10 15 05 00 -40.6800 144.6800 164.00 94.00 70.00 41026 CGO 1997 08 08 05 30 00 1029-91 D co CCGG 60.420 -999.990 ... R5 1997 10 15 13 04 00 -40.6800 144.6800 164.00 94.00 70.00 41027 CGO 1997 08 08 05 30 00 1030-91 D co CCGG 60.810 -999.990 ... R5 1997 10 15 13 17 00 -40.6800 144.6800 164.00 94.00 70.00 41028 CGO 1997 08 13 05 25 00 6797-66 P co CCGG 60.160 -999.990 ... R5 1997 09 10 15 19 00 -40.6800 144.6800 164.00 94.00 70.00 41029 CGO 1997 08 13 05 25 00 6798-66 P co CCGG 61.080 -999.990 ... R5 1997 09 10 15 32 00 -40.6800 144.6800 164.00 94.00 70.00 41030 CGO 1997 08 13 05 35 00 1961-91 D co CCGG 61.820 -999.990 ... R5 1997 10 15 12 37 00 -40.6800 144.6800 164.00 94.00 70.00 41031 CGO 1997 08 13 05 35 00 1962-91 D co CCGG 60.730 -999.990 ..I R5 1997 10 15 12 51 00 -40.6800 144.6800 164.00 94.00 70.00 41032 CGO 1997 08 27 02 52 00 645-91 D co CCGG 69.920 -999.990 ... R5 1997 12 10 14 39 00 -40.6800 144.6800 164.00 94.00 70.00 41033 CGO 1997 08 27 02 52 00 646-91 D co CCGG 68.870 -999.990 ... R5 1997 12 10 14 52 00 -40.6800 144.6800 164.00 94.00 70.00 41034 CGO 1997 08 27 03 10 00 6711-66 P co CCGG 70.910 -999.990 ... R5 1997 10 16 14 37 00 -40.6800 144.6800 164.00 94.00 70.00 41035 CGO 1997 08 27 03 10 00 6712-66 P co CCGG 70.080 -999.990 ... R5 1997 10 16 14 50 00 -40.6800 144.6800 164.00 94.00 70.00 41036 CGO 1997 09 09 03 49 00 6907-66 P co CCGG 63.930 -999.990 ... R5 1997 10 16 15 04 00 -40.6800 144.6800 164.00 94.00 70.00 41037 CGO 1997 09 09 03 49 00 6908-66 P co CCGG 64.540 -999.990 ... R5 1997 10 16 15 17 00 -40.6800 144.6800 164.00 94.00 70.00 41038 CGO 1997 09 09 03 59 00 843-91 D co CCGG 65.930 -999.990 ..I R5 1997 12 10 16 36 00 -40.6800 144.6800 164.00 94.00 70.00 41039 CGO 1997 09 09 03 59 00 844-91 D co CCGG 64.440 -999.990 ... R5 1997 12 10 16 50 00 -40.6800 144.6800 164.00 94.00 70.00 41040 CGO 1997 09 15 04 21 00 6295-66 P co CCGG 75.950 -999.990 .X. R5 1997 11 03 09 01 00 -40.6800 144.6800 164.00 94.00 70.00 41041 CGO 1997 09 15 04 21 00 6296-66 P co CCGG 74.790 -999.990 .X. R5 1997 11 03 09 15 00 -40.6800 144.6800 164.00 94.00 70.00 41042 CGO 1997 09 15 04 42 00 725-91 D co CCGG 74.570 -999.990 ..I R5 1997 12 03 11 41 00 -40.6800 144.6800 164.00 94.00 70.00 41043 CGO 1997 09 15 04 42 00 726-91 D co CCGG 74.120 -999.990 ... R5 1997 12 03 11 55 00 -40.6800 144.6800 164.00 94.00 70.00 41044 CGO 1997 09 29 04 59 00 6041-66 P co CCGG 67.040 -999.990 ... R5 1997 10 31 13 35 00 -40.6800 144.6800 164.00 94.00 70.00 41045 CGO 1997 09 29 04 59 00 6042-66 P co CCGG 65.630 -999.990 ... R5 1997 10 31 13 49 00 -40.6800 144.6800 164.00 94.00 70.00 41046 CGO 1997 09 29 05 17 00 195-91 D co CCGG 66.010 -999.990 ... R5 1997 12 03 12 08 00 -40.6800 144.6800 164.00 94.00 70.00 41047 CGO 1997 09 29 05 17 00 196-91 D co CCGG 65.770 -999.990 ... R5 1997 12 03 12 21 00 -40.6800 144.6800 164.00 94.00 70.00 41048 CGO 1997 10 03 03 15 00 6837-66 P co CCGG 66.010 -999.990 ... R5 1997 11 13 10 18 00 -40.6800 144.6800 164.00 94.00 70.00 41049 CGO 1997 10 03 03 15 00 6838-66 P co CCGG 65.880 -999.990 ... R5 1997 11 13 10 31 00 -40.6800 144.6800 164.00 94.00 70.00 41050 CGO 1997 10 03 03 30 00 1285-91 D co CCGG 65.870 -999.990 ..I R5 1997 12 11 09 50 00 -40.6800 144.6800 164.00 94.00 70.00 41051 CGO 1997 10 03 03 30 00 1286-91 D co CCGG 65.290 -999.990 ... R5 1997 12 11 10 03 00 -40.6800 144.6800 164.00 94.00 70.00 41052 CGO 1997 10 13 04 25 00 1915-91 D co CCGG 66.150 -999.990 ... R5 1997 12 10 17 03 00 -40.6800 144.6800 164.00 94.00 70.00 41053 CGO 1997 10 13 04 25 00 1916-91 D co CCGG 67.360 -999.990 ... R5 1997 12 10 17 17 00 -40.6800 144.6800 164.00 94.00 70.00 41054 CGO 1997 10 13 04 40 00 6469-66 P co CCGG 66.060 -999.990 ... R5 1997 11 13 09 51 00 -40.6800 144.6800 164.00 94.00 70.00 41055 CGO 1997 10 13 04 40 00 6470-66 P co CCGG 66.750 -999.990 ... R5 1997 11 13 10 04 00 -40.6800 144.6800 164.00 94.00 70.00 41056 CGO 1997 10 17 02 29 00 1355-91 P co CCGG 67.980 -999.990 ... R5 1997 12 09 16 12 00 -40.6800 144.6800 164.00 94.00 70.00 41057 CGO 1997 10 17 02 29 00 1356-91 P co CCGG 68.950 -999.990 ... R5 1997 12 09 16 25 00 -40.6800 144.6800 164.00 94.00 70.00 41058 CGO 1997 10 17 02 54 00 4043-91 D co CCGG 69.050 -999.990 ... R5 1997 12 09 12 06 00 -40.6800 144.6800 164.00 94.00 70.00 41059 CGO 1997 10 17 02 54 00 4044-91 D co CCGG 66.850 -999.990 ... R5 1997 12 09 12 19 00 -40.6800 144.6800 164.00 94.00 70.00 41060 CGO 1997 10 24 04 25 00 4045-91 D co CCGG 72.040 -999.990 ..I R5 1997 12 09 13 28 00 -40.6800 144.6800 164.00 94.00 70.00 41061 CGO 1997 10 24 04 25 00 4046-91 D co CCGG 73.110 -999.990 ... R5 1997 12 09 13 41 00 -40.6800 144.6800 164.00 94.00 70.00 41062 CGO 1997 10 24 04 37 00 17-91 P co CCGG 73.240 -999.990 ... R5 1997 12 09 15 43 00 -40.6800 144.6800 164.00 94.00 70.00 41063 CGO 1997 10 24 04 37 00 18-91 P co CCGG 73.390 -999.990 ... R5 1997 12 09 15 56 00 -40.6800 144.6800 164.00 94.00 70.00 41064 CGO 1997 11 07 05 30 00 113-91 P co CCGG 71.810 -999.990 ... R5 1997 12 11 11 38 00 -40.6800 144.6800 164.00 94.00 70.00 41065 CGO 1997 11 07 05 30 00 114-91 P co CCGG 72.140 -999.990 ... R5 1997 12 11 11 52 00 -40.6800 144.6800 164.00 94.00 70.00 41066 CGO 1997 11 07 05 42 00 6437-66 D co CCGG 70.980 -999.990 ... R5 1997 12 11 09 23 00 -40.6800 144.6800 164.00 94.00 70.00 41067 CGO 1997 11 07 05 42 00 6438-66 D co CCGG 72.280 -999.990 ..I R5 1997 12 11 09 36 00 -40.6800 144.6800 164.00 94.00 70.00 41068 CGO 1997 11 13 05 05 00 6637-66 D co CCGG 69.540 -999.990 ... R5 1997 12 11 10 16 00 -40.6800 144.6800 164.00 94.00 70.00 41069 CGO 1997 11 13 05 05 00 6638-66 D co CCGG 68.160 -999.990 ... R5 1997 12 11 10 30 00 -40.6800 144.6800 164.00 94.00 70.00 41070 CGO 1997 11 13 05 20 00 1555-91 P co CCGG 69.420 -999.990 ... R5 1997 12 11 11 12 00 -40.6800 144.6800 164.00 94.00 70.00 41071 CGO 1997 11 13 05 20 00 1556-91 P co CCGG 69.800 -999.990 ... R5 1997 12 11 11 25 00 -40.6800 144.6800 164.00 94.00 70.00 41072 CGO 1997 11 18 02 55 00 847-91 D co CCGG 67.680 -999.990 ..I R5 1998 02 09 14 52 00 -40.6800 144.6800 164.00 94.00 70.00 41073 CGO 1997 11 18 02 55 00 848-91 D co CCGG 67.650 -999.990 ... R5 1998 02 09 15 06 00 -40.6800 144.6800 164.00 94.00 70.00 41074 CGO 1997 11 18 03 07 00 6075-66 P co CCGG 67.890 -999.990 ... R5 1998 01 08 12 44 00 -40.6800 144.6800 164.00 94.00 70.00 41075 CGO 1997 11 18 03 07 00 6076-66 P co CCGG 67.800 -999.990 ... R5 1998 01 08 12 57 00 -40.6800 144.6800 164.00 94.00 70.00 41076 CGO 1997 11 28 04 55 00 6481-66 P co CCGG 60.010 -999.990 ... R5 1998 01 08 11 49 00 -40.6800 144.6800 164.00 94.00 70.00 41077 CGO 1997 11 28 04 55 00 6482-66 P co CCGG 60.120 -999.990 ... R5 1998 01 08 12 02 00 -40.6800 144.6800 164.00 94.00 70.00 41078 CGO 1997 11 28 05 06 00 51-91 D co CCGG 61.690 -999.990 ... R5 1998 02 09 15 19 00 -40.6800 144.6800 164.00 94.00 70.00 41079 CGO 1997 11 28 05 06 00 52-91 D co CCGG 59.790 -999.990 ... R5 1998 02 09 15 33 00 -40.6800 144.6800 164.00 94.00 70.00 41080 CGO 1997 12 03 04 20 00 6137-66 P co CCGG 61.600 -999.990 ... R5 1998 01 27 13 53 00 -40.6800 144.6800 164.00 94.00 70.00 41081 CGO 1997 12 03 04 20 00 6138-66 P co CCGG 61.680 -999.990 ... R5 1998 01 27 14 07 00 -40.6800 144.6800 164.00 94.00 70.00 41082 CGO 1997 12 15 04 30 00 6579-66 P co CCGG 60.940 -999.990 ... R5 1998 01 27 14 20 00 -40.6800 144.6800 164.00 94.00 70.00 41083 CGO 1997 12 15 04 30 00 6580-66 P co CCGG 60.700 -999.990 ... R5 1998 01 27 14 34 00 -40.6800 144.6800 164.00 94.00 70.00 41084 CGO 1997 12 15 04 39 00 6265-66 D co CCGG 59.830 -999.990 ... R5 1998 02 09 16 43 00 -40.6800 144.6800 164.00 94.00 70.00 41085 CGO 1997 12 15 04 39 00 6266-66 D co CCGG 60.790 -999.990 ..I R5 1998 02 09 16 57 00 -40.6800 144.6800 164.00 94.00 70.00 41086 CGO 1997 12 17 03 34 00 4373-91 D co CCGG 58.610 -999.990 ... R5 1998 02 09 14 25 00 -40.6800 144.6800 164.00 94.00 70.00 41087 CGO 1997 12 17 03 34 00 4374-91 D co CCGG 58.190 -999.990 ... R5 1998 02 09 14 38 00 -40.6800 144.6800 164.00 94.00 70.00 41088 CGO 1997 12 17 03 50 00 6179-66 P co CCGG 58.410 -999.990 ... R5 1998 02 09 17 11 00 -40.6800 144.6800 164.00 94.00 70.00 41089 CGO 1997 12 17 03 50 00 6180-66 P co CCGG 58.350 -999.990 ... R5 1998 02 09 17 24 00 -40.6800 144.6800 164.00 94.00 70.00 41090 CGO 1997 12 24 02 25 00 4371-91 D co CCGG 54.460 -999.990 ... R5 1998 02 09 15 47 00 -40.6800 144.6800 164.00 94.00 70.00 41091 CGO 1997 12 24 02 25 00 4372-91 D co CCGG 54.430 -999.990 ..I R5 1998 02 09 16 01 00 -40.6800 144.6800 164.00 94.00 70.00 41092 CGO 1997 12 24 02 45 00 6233-66 P co CCGG 55.180 -999.990 ... R5 1998 02 10 12 10 00 -40.6800 144.6800 164.00 94.00 70.00 41093 CGO 1997 12 24 02 45 00 6234-66 P co CCGG 54.960 -999.990 ... R5 1998 02 10 12 23 00 -40.6800 144.6800 164.00 94.00 70.00 41094 CGO 1998 01 15 04 50 00 6025-66 P co CCGG 52.550 -999.990 ... R5 1998 03 02 10 32 00 -40.6800 144.6800 164.00 94.00 70.00 41095 CGO 1998 01 15 04 50 00 6026-66 P co CCGG 52.240 -999.990 ... R5 1998 03 02 10 46 00 -40.6800 144.6800 164.00 94.00 70.00 41096 CGO 1998 01 15 05 04 00 4641-91 D co CCGG 52.890 -999.990 ... R5 1998 03 30 11 55 00 -40.6800 144.6800 164.00 94.00 70.00 41097 CGO 1998 01 15 05 04 00 4642-91 D co CCGG 52.950 -999.990 ..I R5 1998 03 30 12 09 00 -40.6800 144.6800 164.00 94.00 70.00 41098 CGO 1998 01 23 03 20 00 6389-66 P co CCGG 48.750 -999.990 ... R5 1998 03 02 10 05 00 -40.6800 144.6800 164.00 94.00 70.00 41099 CGO 1998 01 23 03 20 00 6390-66 P co CCGG 50.030 -999.990 ... R5 1998 03 02 10 19 00 -40.6800 144.6800 164.00 94.00 70.00 41100 CGO 1998 01 23 03 45 00 1647-91 D co CCGG 49.810 -999.990 ... R5 1998 03 30 12 23 00 -40.6800 144.6800 164.00 94.00 70.00 41101 CGO 1998 01 23 03 45 00 1648-91 D co CCGG 50.180 -999.990 ... R5 1998 03 30 12 36 00 -40.6800 144.6800 164.00 94.00 70.00 41102 CGO 1998 01 30 04 25 00 6357-66 P co CCGG 48.990 -999.990 ... R5 1998 02 25 13 59 00 -40.6800 144.6800 164.00 94.00 70.00 41103 CGO 1998 01 30 04 25 00 6358-66 P co CCGG 49.330 -999.990 ... R5 1998 02 25 14 13 00 -40.6800 144.6800 164.00 94.00 70.00 41104 CGO 1998 02 03 03 27 00 6407-66 D co CCGG 49.290 -999.990 ..I R5 1998 03 20 12 37 00 -40.6800 144.6800 164.00 94.00 70.00 41105 CGO 1998 02 03 03 27 00 6408-66 D co CCGG 48.410 -999.990 ... R5 1998 03 20 12 51 00 -40.6800 144.6800 164.00 94.00 70.00 41106 CGO 1998 02 03 03 38 00 6161-66 D co CCGG 49.210 -999.990 ... R5 1998 03 20 12 10 00 -40.6800 144.6800 164.00 94.00 70.00 41107 CGO 1998 02 03 03 38 00 6162-66 D co CCGG 49.040 -999.990 ... R5 1998 03 20 12 24 00 -40.6800 144.6800 164.00 94.00 70.00 41108 CGO 1998 02 03 03 53 00 6023-66 P co CCGG 49.210 -999.990 ... R5 1998 02 25 13 31 00 -40.6800 144.6800 164.00 94.00 70.00 41109 CGO 1998 02 03 03 53 00 6024-66 P co CCGG 49.590 -999.990 ... R5 1998 02 25 13 45 00 -40.6800 144.6800 164.00 94.00 70.00 41110 CGO 1998 02 13 05 05 00 6043-66 P co CCGG 48.830 -999.990 ... R5 1998 03 20 13 05 00 -40.6800 144.6800 164.00 94.00 70.00 41111 CGO 1998 02 13 05 05 00 6044-66 P co CCGG 47.880 -999.990 ... R5 1998 03 20 13 18 00 -40.6800 144.6800 164.00 94.00 70.00 41112 CGO 1998 02 13 05 15 00 363-91 D co CCGG 47.580 -999.990 ... R5 1998 06 19 13 17 00 -40.6800 144.6800 164.00 94.00 70.00 41113 CGO 1998 02 13 05 15 00 364-91 D co CCGG 48.730 -999.990 ... R5 1998 06 19 13 31 00 -40.6800 144.6800 164.00 94.00 70.00 41114 CGO 1998 02 20 04 01 00 6183-66 P co CCGG 47.090 -999.990 ..I R5 1998 03 20 11 43 00 -40.6800 144.6800 164.00 94.00 70.00 41115 CGO 1998 02 20 04 01 00 6184-66 P co CCGG 47.070 -999.990 ... R5 1998 03 20 11 56 00 -40.6800 144.6800 164.00 94.00 70.00 41116 CGO 1998 03 05 01 20 00 6497-66 P co CCGG 47.280 -999.990 ... R5 1998 04 09 09 35 00 -40.6800 144.6800 164.00 94.00 70.00 41117 CGO 1998 03 05 01 20 00 6498-66 P co CCGG 46.240 -999.990 ... R5 1998 04 09 09 49 00 -40.6800 144.6800 164.00 94.00 70.00 41118 CGO 1998 03 05 01 35 00 1601-91 D co CCGG 46.120 -999.990 ..I R5 1998 06 19 13 44 00 -40.6800 144.6800 164.00 94.00 70.00 41119 CGO 1998 03 05 01 35 00 1602-91 D co CCGG 45.280 -999.990 ... R5 1998 06 19 13 58 00 -40.6800 144.6800 164.00 94.00 70.00 41120 CGO 1998 03 16 04 17 00 6233-66 P co CCGG 46.560 -999.990 ... R5 1998 04 09 10 02 00 -40.6800 144.6800 164.00 94.00 70.00 41121 CGO 1998 03 16 04 17 00 6234-66 P co CCGG 46.880 -999.990 ... R5 1998 04 09 10 16 00 -40.6800 144.6800 164.00 94.00 70.00 41122 CGO 1998 03 16 04 30 00 6665-66 D co CCGG 47.210 -999.990 ... R5 1998 06 02 13 37 00 -40.6800 144.6800 164.00 94.00 70.00 41123 CGO 1998 03 16 04 30 00 6666-66 D co CCGG 46.060 -999.990 ... R5 1998 06 02 13 50 00 -40.6800 144.6800 164.00 94.00 70.00 41124 CGO 1998 03 24 01 38 00 6899-66 P co CCGG 46.520 -999.990 ... R5 1998 06 03 10 10 00 -40.6800 144.6800 164.00 94.00 70.00 41125 CGO 1998 03 24 01 38 00 6900-66 P co CCGG 45.970 -999.990 ... R5 1998 06 03 10 23 00 -40.6800 144.6800 164.00 94.00 70.00 41126 CGO 1998 03 24 01 50 00 6265-66 D co CCGG 46.000 -999.990 ... R5 1998 06 04 13 54 00 -40.6800 144.6800 164.00 94.00 70.00 41127 CGO 1998 03 24 01 50 00 6266-66 D co CCGG 45.060 -999.990 ..I R5 1998 06 04 14 07 00 -40.6800 144.6800 164.00 94.00 70.00 41128 CGO 1998 03 27 05 05 00 6839-66 P co CCGG 50.770 -999.990 ... R5 1998 06 03 09 42 00 -40.6800 144.6800 164.00 94.00 70.00 41129 CGO 1998 03 27 05 05 00 6840-66 P co CCGG 48.510 -999.990 ... R5 1998 06 03 09 56 00 -40.6800 144.6800 164.00 94.00 70.00 41130 CGO 1998 03 27 05 15 00 165-91 D co CCGG 49.820 -999.990 ... R5 1998 06 02 12 13 00 -40.6800 144.6800 164.00 94.00 70.00 41131 CGO 1998 03 27 05 15 00 166-91 D co CCGG 49.000 -999.990 ..I R5 1998 06 02 12 27 00 -40.6800 144.6800 164.00 94.00 70.00 41132 CGO 1998 04 01 02 35 00 97-91 D co CCGG 46.100 -999.990 ... R5 1998 06 02 13 09 00 -40.6800 144.6800 164.00 94.00 70.00 41133 CGO 1998 04 01 02 35 00 98-91 D co CCGG 47.260 -999.990 ... R5 1998 06 02 13 23 00 -40.6800 144.6800 164.00 94.00 70.00 41134 CGO 1998 04 01 02 49 00 6045-66 P co CCGG 47.100 -999.990 ... R5 1998 05 06 15 10 00 -40.6800 144.6800 164.00 94.00 70.00 41135 CGO 1998 04 01 02 49 00 6046-66 P co CCGG 46.230 -999.990 ... R5 1998 05 06 15 24 00 -40.6800 144.6800 164.00 94.00 70.00 41136 CGO 1998 04 08 02 26 00 6675-66 P co CCGG 48.470 -999.990 ... R5 1998 05 06 15 37 00 -40.6800 144.6800 164.00 94.00 70.00 41137 CGO 1998 04 08 02 26 00 6676-66 P co CCGG 47.960 -999.990 ... R5 1998 05 06 15 51 00 -40.6800 144.6800 164.00 94.00 70.00 41138 CGO 1998 04 08 02 40 00 6527-66 D co CCGG 47.860 -999.990 ... R5 1998 06 02 09 55 00 -40.6800 144.6800 164.00 94.00 70.00 41139 CGO 1998 04 08 02 40 00 6528-66 D co CCGG 48.580 -999.990 ... R5 1998 06 02 10 09 00 -40.6800 144.6800 164.00 94.00 70.00 41140 CGO 1998 04 15 04 25 00 401-91 P co CCGG 49.270 -999.990 ... R5 1998 05 13 10 48 00 -40.6800 144.6800 164.00 94.00 70.00 41141 CGO 1998 04 15 04 25 00 402-91 P co CCGG 49.210 -999.990 ... R5 1998 05 13 11 02 00 -40.6800 144.6800 164.00 94.00 70.00 41142 CGO 1998 04 15 04 35 00 6795-66 D co CCGG 49.280 -999.990 ..I R5 1998 06 02 09 28 00 -40.6800 144.6800 164.00 94.00 70.00 41143 CGO 1998 04 15 04 35 00 6796-66 D co CCGG 48.510 -999.990 ... R5 1998 06 02 09 41 00 -40.6800 144.6800 164.00 94.00 70.00 41144 CGO 1998 04 22 01 41 00 6157-66 D co CCGG 49.460 -999.990 ..I R5 1998 06 09 13 35 00 -40.6800 144.6800 164.00 94.00 70.00 41147 CGO 1998 04 22 01 41 00 6158-66 D co CCGG 49.700 -999.990 ... R5 1998 06 09 13 49 00 -40.6800 144.6800 164.00 94.00 70.00 41148 CGO 1998 04 22 01 41 00 87-91 P co CCGG 50.250 -999.990 ... R5 1998 05 12 15 26 00 -40.6800 144.6800 164.00 94.00 70.00 41145 CGO 1998 04 22 01 41 00 88-91 P co CCGG 50.240 -999.990 ... R5 1998 05 12 15 40 00 -40.6800 144.6800 164.00 94.00 70.00 41146 CGO 1998 04 30 03 10 00 6055-66 D co CCGG 48.180 -999.990 ... R5 1998 06 09 13 08 00 -40.6800 144.6800 164.00 94.00 70.00 41149 CGO 1998 04 30 03 10 00 6056-66 D co CCGG 48.780 -999.990 ... R5 1998 06 09 13 22 00 -40.6800 144.6800 164.00 94.00 70.00 41150 CGO 1998 04 30 03 20 00 6371-66 P co CCGG 48.780 -999.990 ... R5 1998 06 02 15 07 00 -40.6800 144.6800 164.00 94.00 70.00 41151 CGO 1998 04 30 03 20 00 6372-66 P co CCGG 47.700 -999.990 ... R5 1998 06 02 15 21 00 -40.6800 144.6800 164.00 94.00 70.00 41152 CGO 1998 05 07 03 04 00 6583-66 P co CCGG 50.640 -999.990 ... R5 1998 06 02 14 40 00 -40.6800 144.6800 164.00 94.00 70.00 41153 CGO 1998 05 07 03 04 00 6584-66 P co CCGG 49.580 -999.990 ... R5 1998 06 02 14 54 00 -40.6800 144.6800 164.00 94.00 70.00 41154 CGO 1998 05 07 03 12 00 6025-66 D co CCGG 49.520 -999.990 ... R5 1998 06 16 13 54 00 -40.6800 144.6800 164.00 94.00 70.00 41155 CGO 1998 05 07 03 12 00 6026-66 D co CCGG 49.920 -999.990 ... R5 1998 06 16 14 08 00 -40.6800 144.6800 164.00 94.00 70.00 41156 CGO 1998 05 20 02 24 00 6365-66 P co CCGG 58.250 -999.990 ... R5 1998 06 22 11 50 00 -40.6800 144.6800 164.00 94.00 70.00 41157 CGO 1998 05 20 02 24 00 6366-66 P co CCGG 57.870 -999.990 ... R5 1998 06 22 12 04 00 -40.6800 144.6800 164.00 94.00 70.00 41158 CGO 1998 05 20 03 36 00 6161-66 D co CCGG 57.220 -999.990 ..I R5 1998 06 16 13 27 00 -40.6800 144.6800 164.00 94.00 70.00 41159 CGO 1998 05 20 03 36 00 6162-66 D co CCGG 56.690 -999.990 ... R5 1998 06 16 13 40 00 -40.6800 144.6800 164.00 94.00 70.00 41160 CGO 1998 06 01 06 15 00 6413-66 P co CCGG 57.060 -999.990 ... R5 1998 06 22 11 23 00 -40.6800 144.6800 164.00 94.00 70.00 41161 CGO 1998 06 01 06 15 00 6414-66 P co CCGG 56.830 -999.990 ... R5 1998 06 22 11 37 00 -40.6800 144.6800 164.00 94.00 70.00 41162 CGO 1998 06 01 06 40 00 6059-66 D co CCGG 56.310 -999.990 ... R5 1998 07 08 11 39 00 -40.6800 144.6800 164.00 94.00 70.00 41163 CGO 1998 06 01 06 40 00 6060-66 D co CCGG 55.720 -999.990 ... R5 1998 07 08 11 53 00 -40.6800 144.6800 164.00 94.00 70.00 41164 CGO 1998 06 12 03 36 00 6027-66 D co CCGG 58.530 -999.990 ..I R5 1998 07 08 12 07 00 -40.6800 144.6800 164.00 94.00 70.00 41165 CGO 1998 06 12 03 36 00 6028-66 D co CCGG 57.080 -999.990 ... R5 1998 07 08 12 20 00 -40.6800 144.6800 164.00 94.00 70.00 41166 CGO 1998 06 12 03 55 00 6045-66 P co CCGG 58.450 -999.990 ... R5 1998 07 02 12 43 00 -40.6800 144.6800 164.00 94.00 70.00 41167 CGO 1998 06 12 03 55 00 6046-66 P co CCGG 57.280 -999.990 ... R5 1998 07 02 12 56 00 -40.6800 144.6800 164.00 94.00 70.00 41168 CGO 1998 06 16 05 35 00 6393-66 P co CCGG 58.420 -999.990 ... R5 1998 07 02 13 10 00 -40.6800 144.6800 164.00 94.00 70.00 41169 CGO 1998 06 16 05 35 00 6394-66 P co CCGG 58.010 -999.990 ... R5 1998 07 02 13 24 00 -40.6800 144.6800 164.00 94.00 70.00 41170 CGO 1998 06 16 05 50 00 6519-66 D co CCGG 59.890 -999.990 ... R5 1998 08 18 14 51 00 -40.6800 144.6800 164.00 94.00 70.00 41171 CGO 1998 06 16 05 50 00 6520-66 D co CCGG 59.710 -999.990 ..I R5 1998 08 18 15 04 00 -40.6800 144.6800 164.00 94.00 70.00 41172 CGO 1998 06 25 04 05 00 6179-66 D co CCGG 62.810 -999.990 ... R5 1998 08 18 16 12 00 -40.6800 144.6800 164.00 94.00 70.00 41173 CGO 1998 06 25 04 05 00 6180-66 D co CCGG 62.710 -999.990 ... R5 1998 08 18 16 26 00 -40.6800 144.6800 164.00 94.00 70.00 41174 CGO 1998 06 25 04 14 00 6571-66 P co CCGG 62.040 -999.990 ... R5 1998 07 28 15 01 00 -40.6800 144.6800 164.00 94.00 70.00 41175 CGO 1998 06 25 04 14 00 6572-66 P co CCGG 61.990 -999.990 ... R5 1998 07 28 15 14 00 -40.6800 144.6800 164.00 94.00 70.00 41176 CGO 1998 07 01 03 44 00 1229-91 D co CCGG 63.430 -999.990 ... R5 1998 08 19 12 46 00 -40.6800 144.6800 164.00 94.00 70.00 41177 CGO 1998 07 01 03 54 00 6923-66 P co CCGG 63.480 -999.990 ... R5 1998 07 28 16 54 00 -40.6800 144.6800 164.00 94.00 70.00 41178 CGO 1998 07 01 03 54 00 6924-66 P co CCGG 61.060 -999.990 ... R5 1998 07 28 17 08 00 -40.6800 144.6800 164.00 94.00 70.00 41179 CGO 1998 07 09 04 35 00 1807-91 D co CCGG 62.990 -999.990 ..I R5 1998 08 19 11 22 00 -40.6800 144.6800 164.00 94.00 70.00 41180 CGO 1998 07 09 04 35 00 1808-91 D co CCGG 63.420 -999.990 ... R5 1998 08 19 11 36 00 -40.6800 144.6800 164.00 94.00 70.00 41181 CGO 1998 07 09 05 00 00 6665-66 P co CCGG 63.390 -999.990 ... R5 1998 08 04 15 44 00 -40.6800 144.6800 164.00 94.00 70.00 41182 CGO 1998 07 09 05 00 00 6666-66 P co CCGG 62.580 -999.990 ... R5 1998 08 04 15 58 00 -40.6800 144.6800 164.00 94.00 70.00 41183 CGO 1998 07 15 02 56 00 6907-66 P co CCGG 67.520 -999.990 ... R5 1998 08 04 15 17 00 -40.6800 144.6800 164.00 94.00 70.00 41184 CGO 1998 07 15 02 56 00 6908-66 P co CCGG 68.560 -999.990 ... R5 1998 08 04 15 31 00 -40.6800 144.6800 164.00 94.00 70.00 41185 CGO 1998 07 15 03 10 00 6899-66 D co CCGG 66.550 -999.990 ..I R5 1998 09 02 11 13 00 -40.6800 144.6800 164.00 94.00 70.00 41186 CGO 1998 07 15 03 10 00 6900-66 D co CCGG 65.550 -999.990 ... R5 1998 09 02 11 27 00 -40.6800 144.6800 164.00 94.00 70.00 41187 CGO 1998 07 23 05 25 00 6583-66 D co CCGG 71.920 -999.990 ... R5 1998 09 02 10 46 00 -40.6800 144.6800 164.00 94.00 70.00 41188 CGO 1998 07 23 05 25 00 6584-66 D co CCGG 71.220 -999.990 ... R5 1998 09 02 11 00 00 -40.6800 144.6800 164.00 94.00 70.00 41189 CGO 1998 07 23 05 35 00 6037-66 P co CCGG 70.030 -999.990 ... R5 1998 08 27 14 41 00 -40.6800 144.6800 164.00 94.00 70.00 41190 CGO 1998 07 23 05 35 00 6038-66 P co CCGG 72.160 -999.990 ... R5 1998 08 27 14 55 00 -40.6800 144.6800 164.00 94.00 70.00 41191 CGO 1998 07 30 06 05 00 6753-66 P co CCGG 66.190 -999.990 ... R5 1998 08 27 15 08 00 -40.6800 144.6800 164.00 94.00 70.00 41192 CGO 1998 07 30 06 05 00 6754-66 P co CCGG 66.020 -999.990 ... R5 1998 08 27 15 22 00 -40.6800 144.6800 164.00 94.00 70.00 41193 CGO 1998 07 30 06 15 00 6417-66 D co CCGG 66.900 -999.990 ... R5 1998 09 01 12 06 00 -40.6800 144.6800 164.00 94.00 70.00 41194 CGO 1998 07 30 06 15 00 6418-66 D co CCGG 66.850 -999.990 ... R5 1998 09 01 12 20 00 -40.6800 144.6800 164.00 94.00 70.00 41195 CGO 1998 07 30 06 30 00 6934-66 D co CCGG 67.960 -999.990 ..I R5 1998 09 01 16 27 00 -40.6800 144.6800 164.00 94.00 70.00 41196 CGO 1998 08 05 04 22 00 6437-66 P co CCGG 70.190 -999.990 ... R5 1998 09 23 15 54 00 -40.6800 144.6800 164.00 94.00 70.00 41197 CGO 1998 08 05 04 22 00 6438-66 P co CCGG 70.830 -999.990 ... R5 1998 09 23 16 08 00 -40.6800 144.6800 164.00 94.00 70.00 41198 CGO 1998 08 05 04 33 00 6725-66 D co CCGG 70.170 -999.990 ... R5 1998 10 01 13 04 00 -40.6800 144.6800 164.00 94.00 70.00 41199 CGO 1998 08 05 04 33 00 6726-66 D co CCGG 70.820 -999.990 ... R5 1998 10 01 13 18 00 -40.6800 144.6800 164.00 94.00 70.00 41200 CGO 1998 08 29 05 24 00 6637-66 P co CCGG 70.520 -999.990 ... R5 1998 09 23 15 27 00 -40.6800 144.6800 164.00 94.00 70.00 41201 CGO 1998 08 29 05 24 00 6638-66 P co CCGG 71.120 -999.990 ... R5 1998 09 23 15 41 00 -40.6800 144.6800 164.00 94.00 70.00 41202 CGO 1998 08 29 05 35 00 6077-66 D co CCGG 71.780 -999.990 ..I R5 1998 10 01 11 42 00 -40.6800 144.6800 164.00 94.00 70.00 41203 CGO 1998 08 29 05 35 00 6078-66 D co CCGG 71.440 -999.990 ... R5 1998 10 01 11 56 00 -40.6800 144.6800 164.00 94.00 70.00 41204 CGO 1998 09 07 04 10 00 6157-66 P co CCGG 72.230 -999.990 ... R5 1998 10 06 14 53 00 -40.6800 144.6800 164.00 94.00 70.00 41205 CGO 1998 09 07 04 10 00 6158-66 P co CCGG 72.540 -999.990 ... R5 1998 10 06 15 06 00 -40.6800 144.6800 164.00 94.00 70.00 41206 CGO 1998 09 07 04 26 00 6339-66 D co CCGG 71.360 -999.990 ..I R5 1998 10 14 15 28 00 -40.6800 144.6800 164.00 94.00 70.00 41207 CGO 1998 09 07 04 26 00 6340-66 D co CCGG 72.240 -999.990 ... R5 1998 10 14 15 42 00 -40.6800 144.6800 164.00 94.00 70.00 41208 CGO 1998 09 15 05 55 00 6055-66 P co CCGG 72.740 -999.990 ... R5 1998 10 06 14 25 00 -40.6800 144.6800 164.00 94.00 70.00 41209 CGO 1998 09 15 05 55 00 6056-66 P co CCGG 72.850 -999.990 ... R5 1998 10 06 14 39 00 -40.6800 144.6800 164.00 94.00 70.00 41210 CGO 1998 09 15 06 09 00 6423-66 D co CCGG 72.640 -999.990 ... R5 1998 10 14 15 01 00 -40.6800 144.6800 164.00 94.00 70.00 41211 CGO 1998 09 15 06 09 00 6424-66 D co CCGG 71.610 -999.990 ... R5 1998 10 14 15 15 00 -40.6800 144.6800 164.00 94.00 70.00 41212 CGO 1998 09 24 02 47 00 6233-66 D co CCGG 72.180 -999.990 ... R5 1998 11 10 13 49 00 -40.6800 144.6800 164.00 94.00 70.00 41213 CGO 1998 09 24 02 47 00 6234-66 D co CCGG 72.120 -999.990 ... R5 1998 11 10 14 02 00 -40.6800 144.6800 164.00 94.00 70.00 41214 CGO 1998 09 30 02 52 00 6281-66 D co CCGG 72.580 -999.990 ..I R5 1998 11 10 15 11 00 -40.6800 144.6800 164.00 94.00 70.00 41215 CGO 1998 09 30 02 52 00 6282-66 D co CCGG 71.980 -999.990 ... R5 1998 11 10 15 24 00 -40.6800 144.6800 164.00 94.00 70.00 41216 CGO 1998 10 06 02 40 00 6045-66 D co CCGG 74.060 -999.990 ... R5 1998 12 01 13 13 00 -40.6800 144.6800 164.00 94.00 70.00 41217 CGO 1998 10 06 02 40 00 6046-66 D co CCGG 72.400 -999.990 ... R5 1998 12 01 13 27 00 -40.6800 144.6800 164.00 94.00 70.00 41218 CGO 1998 10 15 01 12 00 6393-66 D co CCGG 72.660 -999.990 ... R5 1998 12 01 13 41 00 -40.6800 144.6800 164.00 94.00 70.00 41219 CGO 1998 10 15 01 12 00 6394-66 D co CCGG 72.960 -999.990 ..I R5 1998 12 01 13 54 00 -40.6800 144.6800 164.00 94.00 70.00 41220 CGO 1998 10 20 01 04 00 6261-66 D co CCGG 71.220 -999.990 ... R5 1998 12 01 09 32 00 -40.6800 144.6800 164.00 94.00 70.00 41221 CGO 1998 10 20 01 04 00 6262-66 D co CCGG 72.300 -999.990 ... R5 1998 12 01 09 45 00 -40.6800 144.6800 164.00 94.00 70.00 41222 CGO 1998 10 27 04 52 00 6053-66 D co CCGG 69.290 -999.990 ..I R5 1998 12 01 09 04 00 -40.6800 144.6800 164.00 94.00 70.00 41223 CGO 1998 10 27 04 52 00 6054-66 D co CCGG 68.160 -999.990 ... R5 1998 12 01 09 18 00 -40.6800 144.6800 164.00 94.00 70.00 41224 CGO 1998 11 05 04 52 00 6579-66 D co CCGG 67.450 -999.990 ... R5 1998 12 16 15 45 00 -40.6800 144.6800 164.00 94.00 70.00 41225 CGO 1998 11 05 04 52 00 6580-66 D co CCGG 68.230 -999.990 ... R5 1998 12 16 15 59 00 -40.6800 144.6800 164.00 94.00 70.00 41226 CGO 1998 11 17 05 10 00 6923-66 D co CCGG 63.440 -999.990 ..I R5 1998 12 16 15 18 00 -40.6800 144.6800 164.00 94.00 70.00 41227 CGO 1998 11 17 05 10 00 6924-66 D co CCGG 62.090 -999.990 ... R5 1998 12 16 15 31 00 -40.6800 144.6800 164.00 94.00 70.00 41228 CGO 1998 11 27 03 32 00 6075-66 D co CCGG 61.200 -999.990 P.. R5 1998 12 28 12 00 00 -40.6800 144.6800 164.00 94.00 70.00 41229 CGO 1998 11 27 03 32 00 6076-66 D co CCGG 64.400 -999.990 P.. R5 1998 12 28 12 13 00 -40.6800 144.6800 164.00 94.00 70.00 41230 CGO 1998 11 30 05 13 00 6423-66 D co CCGG 57.420 -999.990 ..I R5 1998 12 28 10 38 00 -40.6800 144.6800 164.00 94.00 70.00 41231 CGO 1998 11 30 05 13 00 6424-66 D co CCGG 58.050 -999.990 ... R5 1998 12 28 10 51 00 -40.6800 144.6800 164.00 94.00 70.00 41232 CGO 1998 12 04 02 50 00 6407-66 D co CCGG 59.490 -999.990 ..I R5 1999 02 08 15 53 00 -40.6800 144.6800 164.00 94.00 70.00 41233 CGO 1998 12 04 02 50 00 6408-66 D co CCGG 59.530 -999.990 ... R5 1999 02 08 16 07 00 -40.6800 144.6800 164.00 94.00 70.00 41234 CGO 1998 12 21 02 48 00 6443-66 D co CCGG 53.160 -999.990 ..I R5 1999 02 08 15 24 00 -40.6800 144.6800 164.00 94.00 70.00 41235 CGO 1998 12 21 02 48 00 6444-66 D co CCGG 52.130 -999.990 ... R5 1999 02 08 15 38 00 -40.6800 144.6800 164.00 94.00 70.00 41236 CGO 1998 12 26 08 25 00 6055-66 D co CCGG 52.280 -999.990 ..I R5 1999 02 19 16 12 00 -40.6800 144.6800 164.00 94.00 70.00 41237 CGO 1998 12 26 08 25 00 6056-66 D co CCGG 51.470 -999.990 ... R5 1999 02 19 16 26 00 -40.6800 144.6800 164.00 94.00 70.00 41238 CGO 1999 01 11 05 54 00 6281-66 D co CCGG 49.550 -999.990 ... R5 1999 02 22 09 41 00 -40.6800 144.6800 164.00 94.00 70.00 41239 CGO 1999 01 11 05 54 00 6282-66 D co CCGG 50.270 -999.990 ..I R5 1999 02 22 09 55 00 -40.6800 144.6800 164.00 94.00 70.00 41240 CGO 1999 01 19 05 25 00 6037-66 D co CCGG 45.510 -999.990 ..I R5 1999 03 25 15 07 00 -40.6800 144.6800 164.00 94.00 70.00 41241 CGO 1999 01 19 05 25 00 6038-66 D co CCGG 46.160 -999.990 ... R5 1999 03 25 15 21 00 -40.6800 144.6800 164.00 94.00 70.00 41242 CGO 1999 02 06 08 40 00 6089-66 D co CCGG 44.680 -999.990 ... R5 1999 03 25 15 35 00 -40.6800 144.6800 164.00 94.00 70.00 41243 CGO 1999 02 06 08 40 00 6090-66 D co CCGG 44.670 -999.990 ..I R5 1999 03 25 15 48 00 -40.6800 144.6800 164.00 94.00 70.00 41244 CGO 1999 02 15 02 14 00 6331-66 D co CCGG 43.410 -999.990 ..I R5 1999 03 25 14 40 00 -40.6800 144.6800 164.00 94.00 70.00 41245 CGO 1999 02 15 02 14 00 6332-66 D co CCGG 42.810 -999.990 ..C R5 1999 03 25 14 54 00 -40.6800 144.6800 164.00 94.00 70.00 41246 CGO 1999 02 17 05 04 00 6011-66 D co CCGG 43.470 -999.990 ..I R5 1999 04 15 13 00 00 -40.6800 144.6800 164.00 94.00 70.00 41247 CGO 1999 02 17 05 04 00 6012-66 D co CCGG 43.570 -999.990 ... R5 1999 04 15 13 13 00 -40.6800 144.6800 164.00 94.00 70.00 41248 CGO 1999 03 04 03 21 00 6247-66 D co CCGG 54.230 -999.990 .XI R5 1999 04 15 13 27 00 -40.6800 144.6800 164.00 94.00 70.00 41249 CGO 1999 03 04 03 21 00 6248-66 D co CCGG 54.010 -999.990 .X. R5 1999 04 15 13 41 00 -40.6800 144.6800 164.00 94.00 70.00 41250 CGO 1999 03 10 05 15 00 6737-66 D co CCGG 44.470 -999.990 ..I R5 1999 04 15 14 51 00 -40.6800 144.6800 164.00 94.00 70.00 41251 CGO 1999 03 10 05 15 00 6738-66 D co CCGG 42.980 -999.990 ..C R5 1999 04 15 15 04 00 -40.6800 144.6800 164.00 94.00 70.00 41252 CGO 1999 03 16 03 23 00 6217-66 D co CCGG 43.840 -999.990 ... R5 1999 04 15 15 18 00 -40.6800 144.6800 164.00 94.00 70.00 41253 CGO 1999 03 16 03 23 00 6218-66 D co CCGG 43.960 -999.990 ..I R5 1999 04 15 15 32 00 -40.6800 144.6800 164.00 94.00 70.00 41254 CGO 1999 03 22 04 10 00 6077-66 D co CCGG -999.990 -999.990 *.I R5 1999 05 18 15 54 00 -40.6800 144.6800 164.00 94.00 70.00 41255 CGO 1999 03 22 04 10 00 6078-66 D co CCGG 43.230 -999.990 ..C R5 1999 05 18 16 08 00 -40.6800 144.6800 164.00 94.00 70.00 41256 CGO 1999 03 30 05 25 00 6265-66 D co CCGG 44.210 -999.990 ..I R5 1999 05 04 15 20 00 -40.6800 144.6800 164.00 94.00 70.00 41257 CGO 1999 03 30 05 25 00 6266-66 D co CCGG 43.030 -999.990 ..C R5 1999 05 04 15 33 00 -40.6800 144.6800 164.00 94.00 70.00 41258 CGO 1999 04 07 03 44 00 6835-66 D co CCGG 46.180 -999.990 ..I R5 1999 05 04 14 51 00 -40.6800 144.6800 164.00 94.00 70.00 41259 CGO 1999 04 07 03 44 00 6836-66 D co CCGG 44.450 -999.990 ... R5 1999 05 04 15 05 00 -40.6800 144.6800 164.00 94.00 70.00 41260 CGO 1999 04 14 02 00 00 6735-66 D co CCGG 48.050 -999.990 ..I R5 1999 05 18 15 27 00 -40.6800 144.6800 164.00 94.00 70.00 41261 CGO 1999 04 14 02 00 00 6736-66 D co CCGG 46.840 -999.990 ... R5 1999 05 18 15 41 00 -40.6800 144.6800 164.00 94.00 70.00 41262 CGO 1999 04 20 02 46 00 6187-66 D co CCGG 48.170 -999.990 P.I R5 1999 06 03 13 31 00 -40.6800 144.6800 164.00 94.00 70.00 41263 CGO 1999 04 20 02 46 00 6188-66 D co CCGG 44.570 -999.990 P.. R5 1999 06 03 13 44 00 -40.6800 144.6800 164.00 94.00 70.00 41264 CGO 1999 04 30 04 00 00 6279-66 D co CCGG 47.800 -999.990 ..I R5 1999 06 03 13 03 00 -40.6800 144.6800 164.00 94.00 70.00 41265 CGO 1999 04 30 04 00 00 6280-66 D co CCGG 48.390 -999.990 ... R5 1999 06 03 13 17 00 -40.6800 144.6800 164.00 94.00 70.00 41266 CGO 1999 05 04 03 38 00 6497-66 D co CCGG 52.170 -999.990 ..I R5 1999 06 17 13 58 00 -40.6800 144.6800 164.00 94.00 70.00 41267 CGO 1999 05 04 03 38 00 6498-66 D co CCGG 51.160 -999.990 ... R5 1999 06 17 14 12 00 -40.6800 144.6800 164.00 94.00 70.00 41268 CGO 1999 05 13 04 08 00 6195-66 D co CCGG -999.990 -999.990 *.. R5 1999 06 17 13 31 00 -40.6800 144.6800 164.00 94.00 70.00 41269 CGO 1999 05 13 04 08 00 6196-66 D co CCGG 51.570 -999.990 ..I R5 1999 06 17 13 44 00 -40.6800 144.6800 164.00 94.00 70.00 41270 CGO 1999 05 27 03 24 00 6039-66 D co CCGG 54.420 -999.990 P.I R5 1999 07 19 11 01 00 -40.6800 144.6800 164.00 94.00 70.00 41271 CGO 1999 05 27 03 24 00 6040-66 D co CCGG 51.710 -999.990 P.. R5 1999 07 19 11 14 00 -40.6800 144.6800 164.00 94.00 70.00 41272 CGO 1999 05 31 05 40 00 6023-66 D co CCGG 52.790 -999.990 ..I R5 1999 07 16 15 54 00 -40.6800 144.6800 164.00 94.00 70.00 41273 CGO 1999 05 31 05 40 00 6024-66 D co CCGG 50.860 -999.990 ... R5 1999 07 16 16 08 00 -40.6800 144.6800 164.00 94.00 70.00 41274 CGO 1999 06 06 06 32 00 6797-66 D co CCGG 51.630 -999.990 ... R5 1999 07 15 11 30 00 -40.6800 144.6800 164.00 94.00 70.00 41275 CGO 1999 06 06 06 32 00 6798-66 D co CCGG 52.510 -999.990 ..I R5 1999 07 15 11 43 00 -40.6800 144.6800 164.00 94.00 70.00 41276 CGO 1999 06 15 05 45 00 6155-66 D co CCGG 52.740 -999.990 ..I R5 1999 07 15 11 57 00 -40.6800 144.6800 164.00 94.00 70.00 41277 CGO 1999 06 15 05 45 00 6156-66 D co CCGG 53.200 -999.990 ... R5 1999 07 15 12 11 00 -40.6800 144.6800 164.00 94.00 70.00 41278 CGO 1999 06 30 05 40 00 6051-66 D co CCGG 55.970 -999.990 ... R5 1999 09 24 14 11 00 -40.6800 144.6800 164.00 94.00 70.00 41279 CGO 1999 06 30 05 40 00 6052-66 D co CCGG 54.310 -999.990 ..I R5 1999 09 24 14 25 00 -40.6800 144.6800 164.00 94.00 70.00 41280 CGO 1999 07 20 02 32 00 6761-66 D co CCGG 59.290 -999.990 ..I R5 1999 09 24 14 38 00 -40.6800 144.6800 164.00 94.00 70.00 41281 CGO 1999 07 20 02 32 00 6762-66 D co CCGG 58.240 -999.990 ... R5 1999 09 24 14 52 00 -40.6800 144.6800 164.00 94.00 70.00 41282 CGO 1999 07 23 12 34 56 2303-66 D co CCGG 76.080 -999.990 .X. R5 1999 09 28 14 03 00 -40.6800 144.6800 164.00 94.00 70.00 41283 CGO 1999 07 30 03 24 00 6267-66 D co CCGG 57.320 -999.990 ..I R5 1999 09 28 11 45 00 -40.6800 144.6800 164.00 94.00 70.00 41284 CGO 1999 07 30 03 24 00 6268-66 D co CCGG 57.560 -999.990 ... R5 1999 09 28 11 59 00 -40.6800 144.6800 164.00 94.00 70.00 41285 CGO 1999 08 02 06 09 00 6345-66 D co CCGG 61.790 -999.990 ..I R5 1999 09 27 15 34 00 -40.6800 144.6800 164.00 94.00 70.00 41286 CGO 1999 08 02 06 09 00 6346-66 D co CCGG 60.480 -999.990 ... R5 1999 09 27 15 48 00 -40.6800 144.6800 164.00 94.00 70.00 41287 CGO 1999 08 09 04 44 00 6545-66 D co CCGG 59.240 -999.990 ... R5 1999 09 27 15 07 00 -40.6800 144.6800 164.00 94.00 70.00 41288 CGO 1999 08 09 04 44 00 6546-66 D co CCGG 60.810 -999.990 ..I R5 1999 09 27 15 20 00 -40.6800 144.6800 164.00 94.00 70.00 41289 CGO 1999 08 10 05 35 00 6509-66 D co CCGG 62.700 -999.990 ... R5 1999 09 27 09 29 00 -40.6800 144.6800 164.00 94.00 70.00 41290 CGO 1999 08 10 05 35 00 6510-66 D co CCGG 64.230 -999.990 ..I R5 1999 09 27 09 43 00 -40.6800 144.6800 164.00 94.00 70.00 41291 CGO 1999 08 16 03 30 00 6717-66 D co CCGG 61.290 -999.990 ..I R5 1999 09 27 11 20 00 -40.6800 144.6800 164.00 94.00 70.00 41292 CGO 1999 08 16 03 30 00 6718-66 D co CCGG 61.790 -999.990 ... R5 1999 09 27 11 34 00 -40.6800 144.6800 164.00 94.00 70.00 41293 CGO 1999 08 27 05 04 00 1179-91 D co CCGG 68.920 -999.990 ..I R5 1999 10 06 10 10 00 -40.6800 144.6800 164.00 94.00 70.00 41294 CGO 1999 08 27 05 04 00 1180-91 D co CCGG 68.720 -999.990 ... R5 1999 10 06 10 24 00 -40.6800 144.6800 164.00 94.00 70.00 41295 CGO 1999 09 06 05 23 00 4205-91 D co CCGG 64.650 -999.990 ... R5 1999 10 06 11 08 00 -40.6800 144.6800 164.00 94.00 70.00 41296 CGO 1999 09 06 05 23 00 4206-91 D co CCGG 64.170 -999.990 ..I R5 1999 10 06 11 22 00 -40.6800 144.6800 164.00 94.00 70.00 41297 CGO 1999 09 17 05 45 00 6087-66 D co CCGG 66.880 -999.990 ... R5 1999 11 18 14 29 00 -40.6800 144.6800 164.00 94.00 70.00 41298 CGO 1999 09 17 05 45 00 6088-66 D co CCGG 65.910 -999.990 ..I R5 1999 11 18 14 43 00 -40.6800 144.6800 164.00 94.00 70.00 41299 CGO 1999 09 24 05 17 00 6529-66 D co CCGG 71.560 -999.990 ..I R5 1999 11 18 13 07 00 -40.6800 144.6800 164.00 94.00 70.00 41300 CGO 1999 09 24 05 17 00 6530-66 D co CCGG 71.980 -999.990 ... R5 1999 11 18 13 21 00 -40.6800 144.6800 164.00 94.00 70.00 41301 CGO 1999 09 30 02 18 00 6407-66 D co CCGG 71.790 -999.990 ..I R5 1999 11 23 15 25 00 -40.6800 144.6800 164.00 94.00 70.00 41302 CGO 1999 09 30 02 18 00 6408-66 D co CCGG 72.140 -999.990 ... R5 1999 11 23 15 39 00 -40.6800 144.6800 164.00 94.00 70.00 41303 CGO 1999 10 11 05 23 00 6279-66 D co CCGG 78.390 -999.990 .X. R5 1999 11 23 14 58 00 -40.6800 144.6800 164.00 94.00 70.00 41304 CGO 1999 10 11 05 23 00 6280-66 D co CCGG 75.940 -999.990 .XI R5 1999 11 23 15 12 00 -40.6800 144.6800 164.00 94.00 70.00 41305 CGO 1999 10 18 03 15 00 6247-66 D co CCGG 72.120 -999.990 ..I R5 1999 12 08 10 30 00 -40.6800 144.6800 164.00 94.00 70.00 41306 CGO 1999 10 18 03 15 00 6248-66 D co CCGG 72.160 -999.990 ... R5 1999 12 08 10 43 00 -40.6800 144.6800 164.00 94.00 70.00 41307 CGO 1999 10 21 02 33 00 6375-66 D co CCGG 74.070 -999.990 ... R5 1999 12 08 10 58 00 -40.6800 144.6800 164.00 94.00 70.00 41308 CGO 1999 10 21 02 33 00 6376-66 D co CCGG 73.570 -999.990 ..I R5 1999 12 08 11 12 00 -40.6800 144.6800 164.00 94.00 70.00 41309 CGO 1999 10 28 01 40 00 6923-66 D co CCGG 73.210 -999.990 ... R5 1999 12 30 12 19 00 -40.6800 144.6800 164.00 94.00 70.00 41310 CGO 1999 10 28 01 40 00 6924-66 D co CCGG 70.990 -999.990 ..I R5 1999 12 30 12 33 00 -40.6800 144.6800 164.00 94.00 70.00 41311 CGO 1999 11 08 03 19 00 6839-66 D co CCGG 69.830 -999.990 ..I R5 1999 12 30 11 52 00 -40.6800 144.6800 164.00 94.00 70.00 41312 CGO 1999 11 08 03 19 00 6840-66 D co CCGG 67.200 -999.990 ... R5 1999 12 30 12 05 00 -40.6800 144.6800 164.00 94.00 70.00 41313 CGO 1999 11 15 04 12 00 6917-66 D co CCGG 105.810 -999.990 P.I R5 2000 03 10 14 04 00 -40.6800 144.6800 164.00 94.00 70.00 41314 CGO 1999 11 15 04 12 00 6918-66 D co CCGG 66.660 -999.990 P.. R5 2000 03 10 14 18 00 -40.6800 144.6800 164.00 94.00 70.00 41315 CGO 1999 11 23 01 23 00 6413-66 D co CCGG 64.280 -999.990 ... R5 2000 03 10 12 42 00 -40.6800 144.6800 164.00 94.00 70.00 41316 CGO 1999 11 23 01 23 00 6414-66 D co CCGG 64.910 -999.990 ..I R5 2000 03 10 12 56 00 -40.6800 144.6800 164.00 94.00 70.00 41317 CGO 1999 12 06 03 02 00 6017-66 D co CCGG 58.950 -999.990 ..I R5 2000 03 10 15 28 00 -40.6800 144.6800 164.00 94.00 70.00 41318 CGO 1999 12 06 03 02 00 6018-66 D co CCGG 58.480 -999.990 ... R5 2000 03 10 15 42 00 -40.6800 144.6800 164.00 94.00 70.00 41319 CGO 1999 12 09 01 19 00 6681-66 D co CCGG 62.230 -999.990 ... R5 2000 03 10 15 01 00 -40.6800 144.6800 164.00 94.00 70.00 41320 CGO 1999 12 09 01 19 00 6682-66 D co CCGG 61.250 -999.990 ..I R5 2000 03 10 15 14 00 -40.6800 144.6800 164.00 94.00 70.00 41321 CGO 1999 12 16 03 29 00 6427-66 D co CCGG 55.900 -999.990 ..I R5 2000 03 13 10 50 00 -40.6800 144.6800 164.00 94.00 70.00 41322 CGO 1999 12 16 03 29 00 6428-66 D co CCGG 55.960 -999.990 ... R5 2000 03 13 11 03 00 -40.6800 144.6800 164.00 94.00 70.00 41323 CGO 2000 01 19 00 40 00 6119-66 D co CCGG 56.600 -999.990 .X. R5 2000 03 13 11 44 00 -40.6800 144.6800 164.00 94.00 70.00 41324 CGO 2000 01 19 00 40 00 6120-66 D co CCGG 57.770 -999.990 .XI R5 2000 03 13 11 58 00 -40.6800 144.6800 164.00 94.00 70.00 41325 CGO 2000 01 21 01 05 00 6517-66 D co CCGG 46.740 -999.990 ..I R5 2000 03 13 09 54 00 -40.6800 144.6800 164.00 94.00 70.00 41326 CGO 2000 01 21 01 05 00 6518-66 D co CCGG 47.040 -999.990 ... R5 2000 03 13 10 07 00 -40.6800 144.6800 164.00 94.00 70.00 41327 CGO 2000 01 28 00 45 00 6249-66 D co CCGG 44.590 -999.990 ... R5 2000 03 13 10 21 00 -40.6800 144.6800 164.00 94.00 70.00 41328 CGO 2000 01 28 00 45 00 6250-66 D co CCGG 44.760 -999.990 ..I R5 2000 03 13 10 34 00 -40.6800 144.6800 164.00 94.00 70.00 41329 CGO 2000 02 11 00 09 00 6013-66 D co CCGG 43.400 -999.990 ... R5 2000 03 31 13 24 00 -40.6800 144.6800 164.00 94.00 70.00 41330 CGO 2000 02 11 00 09 00 6014-66 D co CCGG 44.490 -999.990 ..I R5 2000 03 31 13 37 00 -40.6800 144.6800 164.00 94.00 70.00 41331 CGO 2000 02 23 03 29 00 6479-66 D co CCGG 50.230 -999.990 ..I R5 2000 03 31 12 58 00 -40.6800 144.6800 164.00 94.00 70.00 41332 CGO 2000 02 23 03 29 00 6480-66 D co CCGG 49.810 -999.990 ... R5 2000 03 31 13 11 00 -40.6800 144.6800 164.00 94.00 70.00 41333 CGO 2000 02 27 09 40 00 6492-66 D co CCGG 42.780 -999.990 ..I R5 2000 04 04 16 19 00 -40.6800 144.6800 164.00 94.00 70.00 41334 CGO 2000 03 03 03 15 00 6375-66 D co CCGG 43.590 -999.990 ..I R5 2000 04 04 15 40 00 -40.6800 144.6800 164.00 94.00 70.00 41335 CGO 2000 03 03 03 15 00 6376-66 D co CCGG 42.740 -999.990 ..C R5 2000 04 04 15 53 00 -40.6800 144.6800 164.00 94.00 70.00 41336 CGO 2000 03 14 01 34 00 6727-66 D co CCGG 44.220 -999.990 ... R5 2000 04 24 15 06 00 -40.6800 144.6800 164.00 94.00 70.00 41337 CGO 2000 03 14 01 34 00 6728-66 D co CCGG 44.160 -999.990 ..I R5 2000 04 24 15 19 00 -40.6800 144.6800 164.00 94.00 70.00 41338 CGO 2000 03 20 03 17 00 6231-66 D co CCGG 43.170 -999.990 ..I R5 2000 04 25 09 50 00 -40.6800 144.6800 164.00 94.00 70.00 41339 CGO 2000 03 20 03 17 00 6232-66 D co CCGG 42.510 -999.990 ..C R5 2000 04 25 10 03 00 -40.6800 144.6800 164.00 94.00 70.00 41340 CGO 2000 03 29 05 24 00 6089-66 D co CCGG 47.320 -999.990 ..I R5 2000 06 12 15 11 00 -40.6800 144.6800 164.00 94.00 70.00 41341 CGO 2000 03 29 05 24 00 6090-66 D co CCGG 45.330 -999.990 ... R5 2000 06 12 15 24 00 -40.6800 144.6800 164.00 94.00 70.00 41342 CGO 2000 04 06 04 43 00 6571-66 D co CCGG 43.960 -999.990 ... R5 2000 06 12 15 37 00 -40.6800 144.6800 164.00 94.00 70.00 41343 CGO 2000 04 06 04 43 00 6572-66 D co CCGG 44.650 -999.990 ..I R5 2000 06 12 15 50 00 -40.6800 144.6800 164.00 94.00 70.00 41344 CGO 2000 04 14 07 05 00 6027-66 D co CCGG 55.840 -999.990 .XI R5 2000 06 12 10 40 00 -40.6800 144.6800 164.00 94.00 70.00 41345 CGO 2000 04 14 07 05 00 6028-66 D co CCGG 54.880 -999.990 .X. R5 2000 06 12 10 53 00 -40.6800 144.6800 164.00 94.00 70.00 41346 CGO 2000 04 18 04 45 00 6179-66 D co CCGG 47.900 -999.990 ..I R5 2000 06 12 11 06 00 -40.6800 144.6800 164.00 94.00 70.00 41347 CGO 2000 04 18 04 45 00 6180-66 D co CCGG 47.800 -999.990 ... R5 2000 06 12 11 19 00 -40.6800 144.6800 164.00 94.00 70.00 41348 CGO 2000 05 06 03 47 00 4321-91 D co CCGG 51.020 -999.990 ..I R5 2000 07 05 12 54 00 -40.6800 144.6800 164.00 94.00 70.00 41349 CGO 2000 05 06 03 47 00 4322-91 D co CCGG 50.190 -999.990 ... R5 2000 07 05 13 07 00 -40.6800 144.6800 164.00 94.00 70.00 41350 CGO 2000 05 15 03 44 00 4035-91 D co CCGG 50.110 -999.990 ..I R5 2000 07 05 13 21 00 -40.6800 144.6800 164.00 94.00 70.00 41351 CGO 2000 05 15 03 44 00 4036-91 D co CCGG 49.420 -999.990 ... R5 2000 07 05 13 34 00 -40.6800 144.6800 164.00 94.00 70.00 41352 CGO 2000 05 22 05 49 00 6339-66 D co CCGG 53.680 -999.990 ..I R5 2000 06 30 09 18 00 -40.6800 144.6800 164.00 94.00 70.00 41353 CGO 2000 05 22 05 49 00 6340-66 D co CCGG 52.160 -999.990 ... R5 2000 06 30 09 31 00 -40.6800 144.6800 164.00 94.00 70.00 41354 CGO 2000 05 30 05 05 00 6345-66 D co CCGG 51.610 -999.990 ... R5 2000 06 30 09 44 00 -40.6800 144.6800 164.00 94.00 70.00 41355 CGO 2000 05 30 05 05 00 6346-66 D co CCGG 52.580 -999.990 ..I R5 2000 06 30 09 57 00 -40.6800 144.6800 164.00 94.00 70.00 41356 CGO 2000 06 07 04 48 00 6137-66 D co CCGG 52.690 -999.990 ..I R5 2000 07 31 13 13 00 -40.6800 144.6800 164.00 94.00 70.00 41357 CGO 2000 06 07 04 48 00 6138-66 D co CCGG 52.710 -999.990 ... R5 2000 07 31 13 26 00 -40.6800 144.6800 164.00 94.00 70.00 41358 CGO 2000 06 13 05 24 00 6121-66 D co CCGG 55.560 -999.990 ... R5 2000 07 31 12 34 00 -40.6800 144.6800 164.00 94.00 70.00 41359 CGO 2000 06 13 05 24 00 6122-66 D co CCGG 55.420 -999.990 ..I R5 2000 07 31 12 47 00 -40.6800 144.6800 164.00 94.00 70.00 41360 CGO 2000 06 22 03 50 00 6223-66 D co CCGG 54.120 -999.990 ... R5 2000 07 31 11 42 00 -40.6800 144.6800 164.00 94.00 70.00 41361 CGO 2000 06 22 03 50 00 6224-66 D co CCGG 53.950 -999.990 ..I R5 2000 07 31 11 55 00 -40.6800 144.6800 164.00 94.00 70.00 41362 CGO 2000 06 30 06 01 00 6267-66 D co CCGG 56.610 -999.990 ..I R5 2000 07 31 12 08 00 -40.6800 144.6800 164.00 94.00 70.00 41363 CGO 2000 06 30 06 01 00 6268-66 D co CCGG 56.810 -999.990 ... R5 2000 07 31 12 21 00 -40.6800 144.6800 164.00 94.00 70.00 41364 CGO 2000 07 10 05 15 00 6153-66 D co CCGG 64.090 -999.990 .XI R5 2000 08 15 14 34 00 -40.6800 144.6800 164.00 94.00 70.00 41365 CGO 2000 07 10 05 15 00 6154-66 D co CCGG 64.510 -999.990 .X. R5 2000 08 15 14 47 00 -40.6800 144.6800 164.00 94.00 70.00 41366 CGO 2000 07 19 04 54 00 6357-66 D co CCGG 58.930 -999.990 ... R5 2000 08 15 15 00 00 -40.6800 144.6800 164.00 94.00 70.00 41367 CGO 2000 07 19 04 54 00 6358-66 D co CCGG 57.970 -999.990 ..I R5 2000 08 15 15 13 00 -40.6800 144.6800 164.00 94.00 70.00 41368 CGO 2000 07 21 06 05 00 6027-66 D co CCGG 58.460 -999.990 ..I R5 2000 10 13 13 40 00 -40.6800 144.6800 164.00 94.00 70.00 41369 CGO 2000 07 21 06 05 00 6028-66 D co CCGG 56.970 -999.990 ... R5 2000 10 13 13 53 00 -40.6800 144.6800 164.00 94.00 70.00 41370 CGO 2000 07 27 05 33 00 6493-66 D co CCGG 59.510 -999.990 ... R5 2000 10 13 12 38 00 -40.6800 144.6800 164.00 94.00 70.00 41371 CGO 2000 07 27 05 33 00 6494-66 D co CCGG 59.890 -999.990 ..I R5 2000 10 13 12 52 00 -40.6800 144.6800 164.00 94.00 70.00 41372 CGO 2000 08 09 04 37 00 1667-91 D co CCGG 60.320 -999.990 ..I R5 2000 09 29 10 22 00 -40.6800 144.6800 164.00 94.00 70.00 41373 CGO 2000 08 09 04 37 00 1668-91 D co CCGG 59.970 -999.990 ... R5 2000 09 29 10 35 00 -40.6800 144.6800 164.00 94.00 70.00 41374 CGO 2000 08 17 03 42 00 4393-91 D co CCGG 62.840 -999.990 ... R5 2000 09 29 11 45 00 -40.6800 144.6800 164.00 94.00 70.00 41375 CGO 2000 08 17 03 42 00 4394-91 D co CCGG 62.400 -999.990 ..I R5 2000 09 29 11 58 00 -40.6800 144.6800 164.00 94.00 70.00 41376 CGO 2000 08 26 06 10 00 6637-66 D co CCGG 61.850 -999.990 ..I R5 2000 10 13 13 05 00 -40.6800 144.6800 164.00 94.00 70.00 41377 CGO 2000 08 26 06 10 00 6638-66 D co CCGG 61.020 -999.990 ... R5 2000 10 13 13 18 00 -40.6800 144.6800 164.00 94.00 70.00 41378 CGO 2000 08 31 04 47 00 6157-66 D co CCGG 62.510 -999.990 ... R5 2000 10 13 11 46 00 -40.6800 144.6800 164.00 94.00 70.00 41379 CGO 2000 08 31 04 47 00 6158-66 D co CCGG 63.880 -999.990 ..I R5 2000 10 13 11 59 00 -40.6800 144.6800 164.00 94.00 70.00 41380 CGO 2000 09 05 03 01 00 6077-66 D co CCGG 62.570 -999.990 ..I R5 2000 10 13 09 22 00 -40.6800 144.6800 164.00 94.00 70.00 41381 CGO 2000 09 05 03 01 00 6078-66 D co CCGG 62.220 -999.990 ... R5 2000 10 13 09 35 00 -40.6800 144.6800 164.00 94.00 70.00 41382 CGO 2000 09 12 02 36 00 6301-66 D co CCGG 63.230 -999.990 ... R5 2000 10 13 08 56 00 -40.6800 144.6800 164.00 94.00 70.00 41383 CGO 2000 09 12 02 36 00 6302-66 D co CCGG 63.510 -999.990 ..I R5 2000 10 13 09 09 00 -40.6800 144.6800 164.00 94.00 70.00 41384 CGO 2000 09 18 04 50 00 6841-66 D co CCGG 67.290 -999.990 ... R5 2000 10 24 10 02 00 -40.6800 144.6800 164.00 94.00 70.00 41385 CGO 2000 09 18 04 50 00 6842-66 D co CCGG 68.410 -999.990 ..I R5 2000 10 24 10 15 00 -40.6800 144.6800 164.00 94.00 70.00 41386 CGO 2000 09 29 02 13 00 6161-66 D co CCGG 61.580 -999.990 ..I R5 2000 10 24 09 36 00 -40.6800 144.6800 164.00 94.00 70.00 41387 CGO 2000 09 29 02 13 00 6162-66 D co CCGG 61.070 -999.990 ... R5 2000 10 24 09 49 00 -40.6800 144.6800 164.00 94.00 70.00 41388 CGO 2000 10 03 00 30 00 6923-66 D co CCGG 70.270 -999.990 ..I R5 2000 11 29 08 28 00 -40.6800 144.6800 164.00 94.00 70.00 41389 CGO 2000 10 03 00 30 00 6924-66 D co CCGG 68.860 -999.990 ... R5 2000 11 29 08 41 00 -40.6800 144.6800 164.00 94.00 70.00 41390 CGO 2000 10 10 03 32 00 181-98 D co CCGG 63.030 -999.990 ... R5 2000 11 29 08 02 00 -40.6800 144.6800 164.00 94.00 70.00 41391 CGO 2000 10 10 03 32 00 182-98 D co CCGG 61.820 -999.990 ..I R5 2000 11 29 08 15 00 -40.6800 144.6800 164.00 94.00 70.00 41392 CGO 2000 10 16 01 49 00 6139-66 D co CCGG 60.460 -999.990 ..I R5 2000 12 07 11 11 00 -40.6800 144.6800 164.00 94.00 70.00 41393 CGO 2000 10 16 01 49 00 6140-66 D co CCGG 60.410 -999.990 ... R5 2000 12 07 11 24 00 -40.6800 144.6800 164.00 94.00 70.00 41394 CGO 2000 10 27 03 29 00 4667-91 D co CCGG 59.580 -999.990 ... R5 2000 12 07 11 37 00 -40.6800 144.6800 164.00 94.00 70.00 41395 CGO 2000 10 27 03 29 00 4668-91 D co CCGG 60.890 -999.990 ..I R5 2000 12 07 11 50 00 -40.6800 144.6800 164.00 94.00 70.00 41396 CGO 2000 11 03 03 14 00 6051-66 D co CCGG 74.230 -999.990 .X. R5 2001 01 03 12 13 00 -40.6800 144.6800 164.00 94.00 70.00 41397 CGO 2000 11 03 03 14 00 6052-66 D co CCGG 73.090 -999.990 .XI R5 2001 01 03 12 26 00 -40.6800 144.6800 164.00 94.00 70.00 41398 CGO 2000 11 21 02 04 00 6559-66 D co CCGG 56.040 -999.990 ..I R5 2001 01 03 12 39 00 -40.6800 144.6800 164.00 94.00 70.00 41399 CGO 2000 11 21 02 04 00 6560-66 D co CCGG 55.850 -999.990 ... R5 2001 01 03 12 52 00 -40.6800 144.6800 164.00 94.00 70.00 41400 CGO 2000 11 23 03 39 00 6047-66 D co CCGG 56.550 -999.990 ... R5 2001 01 03 10 26 00 -40.6800 144.6800 164.00 94.00 70.00 41401 CGO 2000 11 23 03 39 00 6048-66 D co CCGG 56.110 -999.990 ..I R5 2001 01 03 10 39 00 -40.6800 144.6800 164.00 94.00 70.00 41402 CGO 2000 12 01 02 24 00 6197-66 D co CCGG 53.470 -999.990 ..I R5 2001 01 03 09 58 00 -40.6800 144.6800 164.00 94.00 70.00 41403 CGO 2000 12 01 02 24 00 6198-66 D co CCGG 52.650 -999.990 ... R5 2001 01 03 10 12 00 -40.6800 144.6800 164.00 94.00 70.00 41404 CGO 2000 12 05 04 29 00 6383-66 D co CCGG 55.040 -999.990 ..I R5 2001 03 12 10 11 00 -40.6800 144.6800 164.00 94.00 70.00 41405 CGO 2000 12 05 04 29 00 6384-66 D co CCGG 53.720 -999.990 ... R5 2001 03 12 10 24 00 -40.6800 144.6800 164.00 94.00 70.00 41406 CGO 2000 12 13 02 13 00 6577-66 D co CCGG 51.890 -999.990 ... R5 2001 03 12 09 18 00 -40.6800 144.6800 164.00 94.00 70.00 41407 CGO 2000 12 13 02 13 00 6578-66 D co CCGG 51.930 -999.990 ..I R5 2001 03 12 09 31 00 -40.6800 144.6800 164.00 94.00 70.00 41408 CGO 2000 12 28 02 27 00 579-91 D co CCGG 45.380 -999.990 ... R5 2001 03 12 12 51 00 -40.6800 144.6800 164.00 94.00 70.00 41409 CGO 2000 12 28 02 27 00 580-91 D co CCGG 45.810 -999.990 ..I R5 2001 03 12 13 04 00 -40.6800 144.6800 164.00 94.00 70.00 41410 CGO 2001 01 05 04 02 00 655-91 D co CCGG 50.970 -999.990 ..I R5 2001 03 12 11 58 00 -40.6800 144.6800 164.00 94.00 70.00 41411 CGO 2001 01 05 04 02 00 656-91 D co CCGG 50.100 -999.990 ... R5 2001 03 12 12 12 00 -40.6800 144.6800 164.00 94.00 70.00 41412 CGO 2001 01 15 02 35 00 6075-66 D co CCGG 45.220 -999.990 ... R5 2001 03 28 13 50 00 -40.6800 144.6800 164.00 94.00 70.00 41413 CGO 2001 01 15 02 35 00 6076-66 D co CCGG 43.810 -999.990 ..I R5 2001 03 28 14 03 00 -40.6800 144.6800 164.00 94.00 70.00 41414 CGO 2001 01 23 01 18 00 6215-66 D co CCGG 42.660 -999.990 ..I R5 2001 03 28 10 18 00 -40.6800 144.6800 164.00 94.00 70.00 41415 CGO 2001 01 23 01 18 00 6216-66 D co CCGG 42.640 -999.990 ... R5 2001 03 28 10 31 00 -40.6800 144.6800 164.00 94.00 70.00 41416 CGO 2001 01 29 04 55 00 6341-66 D co CCGG 44.830 -999.990 ... R5 2001 03 28 13 24 00 -40.6800 144.6800 164.00 94.00 70.00 41417 CGO 2001 01 29 04 55 00 6342-66 D co CCGG 44.480 -999.990 ..I R5 2001 03 28 13 37 00 -40.6800 144.6800 164.00 94.00 70.00 41418 CGO 2001 02 09 01 58 00 6502-66 D co CCGG 45.570 -999.990 ... R5 2001 03 28 14 29 00 -40.6800 144.6800 164.00 94.00 70.00 41419 CGO 2001 02 14 02 27 00 6733-66 D co CCGG 43.630 -999.990 ..I R5 2001 07 13 12 31 00 -40.6800 144.6800 164.00 94.00 70.00 41420 CGO 2001 02 14 02 27 00 6734-66 D co CCGG 42.300 -999.990 ... R5 2001 07 13 12 44 00 -40.6800 144.6800 164.00 94.00 70.00 41421 CGO 2001 02 28 03 38 00 6193-66 D co CCGG 42.730 -999.990 ... R5 2001 07 13 11 12 00 -40.6800 144.6800 164.00 94.00 70.00 41422 CGO 2001 02 28 03 38 00 6194-66 D co CCGG 42.800 -999.990 ..I R5 2001 07 13 11 26 00 -40.6800 144.6800 164.00 94.00 70.00 41423 CGO 2001 03 13 01 59 00 6013-66 D co CCGG 43.560 -999.990 ..I R5 2001 07 10 13 27 00 -40.6800 144.6800 164.00 94.00 70.00 41424 CGO 2001 03 13 01 59 00 6014-66 D co CCGG 43.780 -999.990 ... R5 2001 07 10 13 40 00 -40.6800 144.6800 164.00 94.00 70.00 41425 CGO 2001 03 23 02 47 00 6169-66 D co CCGG 48.340 -999.990 N.. R5 2001 07 10 13 53 00 -40.6800 144.6800 164.00 94.00 70.00 41426 CGO 2001 03 23 02 47 00 6170-66 D co CCGG 52.770 -999.990 N.I R5 2001 07 10 14 06 00 -40.6800 144.6800 164.00 94.00 70.00 41427 CGO 2001 03 27 03 04 00 4139-91 D co CCGG 43.720 -999.990 ..I R5 2001 07 10 11 40 00 -40.6800 144.6800 164.00 94.00 70.00 41428 CGO 2001 03 27 03 04 00 4140-91 D co CCGG 42.880 -999.990 ... R5 2001 07 10 11 53 00 -40.6800 144.6800 164.00 94.00 70.00 41429 CGO 2001 04 02 03 50 00 725-91 D co CCGG 44.650 -999.990 ... R5 2001 07 10 12 59 00 -40.6800 144.6800 164.00 94.00 70.00 41430 CGO 2001 04 02 03 50 00 726-91 D co CCGG 43.860 -999.990 ..I R5 2001 07 10 13 12 00 -40.6800 144.6800 164.00 94.00 70.00 41431 CGO 2001 04 11 04 30 00 6413-66 D co CCGG 44.190 -999.990 ..I R5 2001 07 16 10 18 00 -40.6800 144.6800 164.00 94.00 70.00 41432 CGO 2001 04 11 04 30 00 6414-66 D co CCGG 44.220 -999.990 ... R5 2001 07 16 10 31 00 -40.6800 144.6800 164.00 94.00 70.00 41433 CGO 2001 04 19 05 02 00 6855-66 D co CCGG 44.960 -999.990 ... R5 2001 07 16 10 44 00 -40.6800 144.6800 164.00 94.00 70.00 41434 CGO 2001 04 19 05 02 00 6856-66 D co CCGG 45.430 -999.990 ..I R5 2001 07 16 10 57 00 -40.6800 144.6800 164.00 94.00 70.00 41435 CGO 2001 04 27 00 32 00 471-91 D co CCGG 45.440 -999.990 ... R5 2001 06 07 09 13 00 -40.6800 144.6800 164.00 94.00 70.00 41436 CGO 2001 04 27 00 32 00 472-91 D co CCGG 45.710 -999.990 ... R5 2001 06 07 09 26 00 -40.6800 144.6800 164.00 94.00 70.00 41437 CGO 2001 05 18 22 39 00 4657-91 D co CCGG 48.990 -999.990 ... R5 2001 06 06 14 52 00 -40.6800 144.6800 164.00 94.00 70.00 41438 CGO 2001 05 18 22 39 00 4658-91 D co CCGG 49.490 -999.990 ... R5 2001 06 06 15 05 00 -40.6800 144.6800 164.00 94.00 70.00 41439 CGO 2001 05 30 02 00 00 6367-66 D co CCGG 54.820 -999.990 ... R5 2001 08 13 15 09 00 -40.6800 144.6800 164.00 94.00 70.00 41440 CGO 2001 05 30 02 00 00 6368-66 D co CCGG 148.670 -999.990 N.I R5 2001 08 13 15 22 00 -40.6800 144.6800 164.00 94.00 70.00 41441 CGO 2001 06 13 03 27 00 6519-66 D co CCGG 56.310 -999.990 ..I R5 2001 08 08 14 33 00 -40.6800 144.6800 164.00 94.00 70.00 41442 CGO 2001 06 13 03 27 00 6520-66 D co CCGG 56.220 -999.990 ... R5 2001 08 08 14 46 00 -40.6800 144.6800 164.00 94.00 70.00 41443 CGO 2001 06 15 05 36 00 1031-91 D co CCGG 53.200 -999.990 ... R5 2001 08 06 09 26 00 -40.6800 144.6800 164.00 94.00 70.00 41444 CGO 2001 06 15 05 36 00 1032-91 D co CCGG 53.450 -999.990 ..I R5 2001 08 06 09 39 00 -40.6800 144.6800 164.00 94.00 70.00 41445 CGO 2001 06 20 03 15 00 1627-91 D co CCGG 56.120 -999.990 ..I R5 2001 08 06 09 00 00 -40.6800 144.6800 164.00 94.00 70.00 41446 CGO 2001 06 20 03 15 00 1628-91 D co CCGG 55.820 -999.990 ... R5 2001 08 06 09 13 00 -40.6800 144.6800 164.00 94.00 70.00 41447 CGO 2001 06 26 06 01 00 149-91 D co CCGG 55.530 -999.990 ..I R5 2001 08 13 16 29 00 -40.6800 144.6800 164.00 94.00 70.00 41448 CGO 2001 06 26 06 01 00 150-91 D co CCGG 56.050 -999.990 ... R5 2001 08 13 16 42 00 -40.6800 144.6800 164.00 94.00 70.00 41449 CGO 2001 07 16 02 53 00 2039-91 D co CCGG 56.910 -999.990 ..I R5 2001 08 13 14 43 00 -40.6800 144.6800 164.00 94.00 70.00 41450 CGO 2001 07 16 02 53 00 2040-91 D co CCGG 56.550 -999.990 ... R5 2001 08 13 14 56 00 -40.6800 144.6800 164.00 94.00 70.00 41451 CGO 2001 07 19 05 10 00 4731-91 D co CCGG 60.850 -999.990 ..I R5 2001 08 23 10 34 00 -40.6800 144.6800 164.00 94.00 70.00 41452 CGO 2001 07 19 05 10 00 4732-91 D co CCGG 58.920 -999.990 ... R5 2001 08 23 10 47 00 -40.6800 144.6800 164.00 94.00 70.00 41453 CGO 2001 07 27 03 40 00 4655-91 D co CCGG 61.780 -999.990 ..I R5 2001 08 23 10 07 00 -40.6800 144.6800 164.00 94.00 70.00 41454 CGO 2001 07 27 03 40 00 4656-91 D co CCGG 59.740 -999.990 ... R5 2001 08 23 10 20 00 -40.6800 144.6800 164.00 94.00 70.00 41455 CGO 2001 08 01 03 04 00 205-91 D co CCGG 60.060 -999.990 ... R5 2001 09 14 10 58 00 -40.6800 144.6800 164.00 94.00 70.00 41456 CGO 2001 08 01 03 04 00 206-91 D co CCGG 60.540 -999.990 ..I R5 2001 09 14 11 11 00 -40.6800 144.6800 164.00 94.00 70.00 41457 CGO 2001 08 06 04 28 00 1369-91 D co CCGG 59.550 -999.990 ..I R5 2001 09 14 11 24 00 -40.6800 144.6800 164.00 94.00 70.00 41458 CGO 2001 08 06 04 28 00 1370-91 D co CCGG 60.100 -999.990 ... R5 2001 09 14 11 37 00 -40.6800 144.6800 164.00 94.00 70.00 41459 CGO 2001 08 17 03 53 00 765-91 D co CCGG 64.030 -999.990 ..I R5 2001 10 25 16 49 00 -40.6800 144.6800 164.00 94.00 70.00 41460 CGO 2001 08 17 03 53 00 766-91 D co CCGG 64.980 -999.990 ... R5 2001 10 25 17 02 00 -40.6800 144.6800 164.00 94.00 70.00 41461 CGO 2001 09 04 03 32 00 1329-91 D co CCGG 62.440 -999.990 ..I R5 2001 10 26 10 06 00 -40.6800 144.6800 164.00 94.00 70.00 41462 CGO 2001 09 04 03 32 00 1330-91 D co CCGG 62.290 -999.990 ... R5 2001 10 26 10 19 00 -40.6800 144.6800 164.00 94.00 70.00 41463 CGO 2001 09 14 01 29 00 4583-91 D co CCGG 65.670 -999.990 ..I R5 2001 10 26 10 32 00 -40.6800 144.6800 164.00 94.00 70.00 41464 CGO 2001 09 14 01 29 00 4584-91 D co CCGG 64.900 -999.990 ... R5 2001 10 26 10 46 00 -40.6800 144.6800 164.00 94.00 70.00 41465 CGO 2001 09 20 04 00 00 1205-91 D co CCGG 65.660 -999.990 ... R5 2001 10 26 11 00 00 -40.6800 144.6800 164.00 94.00 70.00 41466 CGO 2001 09 20 04 00 00 1206-91 D co CCGG 64.610 -999.990 ..I R5 2001 10 26 11 13 00 -40.6800 144.6800 164.00 94.00 70.00 41467 CGO 2001 09 25 04 08 00 6183-66 D co CCGG 68.780 -999.990 ..I R5 2001 11 02 14 05 00 -40.6800 144.6800 164.00 94.00 70.00 41468 CGO 2001 09 25 04 08 00 6184-66 D co CCGG 68.530 -999.990 ... R5 2001 11 02 14 18 00 -40.6800 144.6800 164.00 94.00 70.00 41469 CGO 2001 10 03 03 46 00 6469-66 D co CCGG 69.430 -999.990 ..I R5 2001 11 02 14 57 00 -40.6800 144.6800 164.00 94.00 70.00 41470 CGO 2001 10 03 03 46 00 6470-66 D co CCGG 69.610 -999.990 ... R5 2001 11 02 15 10 00 -40.6800 144.6800 164.00 94.00 70.00 41471 CGO 2001 10 12 03 42 00 301-99 D co CCGG 70.450 -999.990 ..I R5 2001 11 20 12 06 00 -40.6800 144.6800 164.00 94.00 70.00 41472 CGO 2001 10 12 03 42 00 302-99 D co CCGG 70.100 -999.990 ... R5 2001 11 20 12 19 00 -40.6800 144.6800 164.00 94.00 70.00 41473 CGO 2001 10 18 03 08 00 4497-91 D co CCGG 66.610 -999.990 ..I R5 2001 11 20 12 58 00 -40.6800 144.6800 164.00 94.00 70.00 41474 CGO 2001 10 18 03 08 00 4498-91 D co CCGG 67.070 -999.990 ... R5 2001 11 20 13 11 00 -40.6800 144.6800 164.00 94.00 70.00 41475 CGO 2001 10 29 01 55 00 6331-66 D co CCGG 66.100 -999.990 ... R5 2002 02 19 16 39 00 -40.6800 144.6800 164.00 94.00 70.00 41476 CGO 2001 11 13 02 47 00 6903-66 D co CCGG 61.640 -999.990 ..I R5 2002 02 19 13 55 00 -40.6800 144.6800 164.00 94.00 70.00 41477 CGO 2001 11 13 02 47 00 6904-66 D co CCGG 61.860 -999.990 ... R5 2002 02 19 14 08 00 -40.6800 144.6800 164.00 94.00 70.00 41478 CGO 2001 11 26 03 18 00 1647-91 D co CCGG 60.540 -999.990 ..I R5 2002 02 21 13 25 00 -40.6800 144.6800 164.00 94.00 70.00 41479 CGO 2001 11 26 03 18 00 1648-91 D co CCGG 60.310 -999.990 ... R5 2002 02 21 13 38 00 -40.6800 144.6800 164.00 94.00 70.00 41480 CGO 2001 12 10 01 41 00 4799-91 D co CCGG 54.720 -999.990 ... R5 2002 02 21 11 21 00 -40.6800 144.6800 164.00 94.00 70.00 41481 CGO 2001 12 10 01 41 00 4800-91 D co CCGG 53.790 -999.990 ..I R5 2002 02 21 11 35 00 -40.6800 144.6800 164.00 94.00 70.00 41482 CGO 2001 12 21 05 40 00 6045-66 D co CCGG 51.470 -999.990 ..I R5 2002 02 21 13 51 00 -40.6800 144.6800 164.00 94.00 70.00 41483 CGO 2001 12 21 05 40 00 6046-66 D co CCGG 50.070 -999.990 ... R5 2002 02 21 14 04 00 -40.6800 144.6800 164.00 94.00 70.00 41484 CGO 2002 01 03 02 05 00 6413-66 D co CCGG 47.550 -999.990 ..I R5 2002 02 21 12 05 00 -40.6800 144.6800 164.00 94.00 70.00 41485 CGO 2002 01 03 02 05 00 6414-66 D co CCGG 47.110 -999.990 ... R5 2002 02 21 12 18 00 -40.6800 144.6800 164.00 94.00 70.00 41486 CGO 2002 01 08 03 35 00 1025-91 D co CCGG 48.080 -999.990 ..I R5 2002 05 09 12 33 00 -40.6800 144.6800 164.00 94.00 70.00 41487 CGO 2002 01 08 03 35 00 1026-91 D co CCGG 46.740 -999.990 ... R5 2002 05 09 12 46 00 -40.6800 144.6800 164.00 94.00 70.00 41488 CGO 2002 01 14 02 10 00 615-91 D co CCGG 47.610 -999.990 ... R5 2002 05 09 12 59 00 -40.6800 144.6800 164.00 94.00 70.00 41489 CGO 2002 01 14 02 10 00 616-91 D co CCGG 47.950 -999.990 ..I R5 2002 05 09 13 12 00 -40.6800 144.6800 164.00 94.00 70.00 41490 CGO 2002 01 29 05 22 00 6231-66 D co CCGG 47.350 -999.990 ..I R5 2002 05 08 13 37 00 -40.6800 144.6800 164.00 94.00 70.00 41491 CGO 2002 01 29 05 22 00 6232-66 D co CCGG 46.770 -999.990 ... R5 2002 05 08 13 50 00 -40.6800 144.6800 164.00 94.00 70.00 41492 CGO 2002 02 18 04 09 00 6493-66 D co CCGG 43.580 -999.990 ..I R5 2002 05 08 13 11 00 -40.6800 144.6800 164.00 94.00 70.00 41493 CGO 2002 02 18 04 09 00 6494-66 D co CCGG 43.380 -999.990 ... R5 2002 05 08 13 24 00 -40.6800 144.6800 164.00 94.00 70.00 41494 CGO 2002 02 21 02 28 00 1019-91 D co CCGG 43.790 -999.990 ..I R5 2002 05 08 11 50 00 -40.6800 144.6800 164.00 94.00 70.00 41495 CGO 2002 02 21 02 28 00 1020-91 D co CCGG 42.490 -999.990 ... R5 2002 05 08 12 04 00 -40.6800 144.6800 164.00 94.00 70.00 41496 CGO 2002 02 27 04 06 00 4665-91 D co CCGG 42.710 -999.990 ..I R5 2002 05 08 12 44 00 -40.6800 144.6800 164.00 94.00 70.00 41497 CGO 2002 02 27 04 06 00 4666-91 D co CCGG 42.220 -999.990 ... R5 2002 05 08 12 57 00 -40.6800 144.6800 164.00 94.00 70.00 41498 CGO 2002 03 07 02 19 00 1149-91 D co CCGG 45.450 -999.990 ..I R5 2002 06 04 10 26 00 -40.6800 144.6800 164.00 94.00 70.00 41499 CGO 2002 03 07 02 19 00 1150-91 D co CCGG 43.650 -999.990 ... R5 2002 06 04 10 39 00 -40.6800 144.6800 164.00 94.00 70.00 41500 CGO 2002 03 13 02 37 00 1137-91 D co CCGG 48.940 -999.990 ... R5 2002 06 04 10 52 00 -40.6800 144.6800 164.00 94.00 70.00 41501 CGO 2002 03 13 02 37 00 1138-91 D co CCGG 50.430 -999.990 ..I R5 2002 06 04 11 05 00 -40.6800 144.6800 164.00 94.00 70.00 41502 CGO 2002 03 20 01 21 00 851-91 D co CCGG 43.960 -999.990 ... R5 2002 06 03 10 57 00 -40.6800 144.6800 164.00 94.00 70.00 41503 CGO 2002 03 20 01 21 00 852-91 D co CCGG 44.190 -999.990 ..I R5 2002 06 03 11 10 00 -40.6800 144.6800 164.00 94.00 70.00 41504 CGO 2002 03 27 00 57 00 71-99 D co CCGG 48.040 -999.990 ..I R5 2002 06 03 11 23 00 -40.6800 144.6800 164.00 94.00 70.00 41505 CGO 2002 03 27 00 57 00 72-99 D co CCGG 46.580 -999.990 ... R5 2002 06 03 11 36 00 -40.6800 144.6800 164.00 94.00 70.00 41506 CGO 2002 04 04 02 24 00 1389-91 D co CCGG 46.420 -999.990 N.I R5 2002 07 17 11 56 00 -40.6800 144.6800 164.00 94.00 70.00 41507 CGO 2002 04 04 02 24 00 1390-91 D co CCGG 43.260 -999.990 ... R5 2002 07 17 12 09 00 -40.6800 144.6800 164.00 94.00 70.00 41508 CGO 2002 04 26 03 35 00 275-91 D co CCGG 49.560 -999.990 ..I R5 2002 07 17 12 22 00 -40.6800 144.6800 164.00 94.00 70.00 41509 CGO 2002 04 26 03 35 00 276-91 D co CCGG 48.610 -999.990 ... R5 2002 07 17 12 36 00 -40.6800 144.6800 164.00 94.00 70.00 41510 CGO 2002 05 06 03 52 00 251-99 D co CCGG 54.800 -999.990 ..I R5 2002 07 17 12 49 00 -40.6800 144.6800 164.00 94.00 70.00 41511 CGO 2002 05 06 03 52 00 252-99 D co CCGG 54.240 -999.990 ... R5 2002 07 17 13 02 00 -40.6800 144.6800 164.00 94.00 70.00 41512 CGO 2002 05 13 05 09 00 495-91 D co CCGG 50.130 -999.990 ..I R5 2002 07 18 13 07 00 -40.6800 144.6800 164.00 94.00 70.00 41513 CGO 2002 05 13 05 09 00 496-91 D co CCGG 49.810 -999.990 ... R5 2002 07 18 13 20 00 -40.6800 144.6800 164.00 94.00 70.00 41514 CGO 2002 05 17 02 30 00 11-98 D co CCGG 51.680 -999.990 ..I R5 2002 07 18 13 33 00 -40.6800 144.6800 164.00 94.00 70.00 41515 CGO 2002 05 17 02 30 00 12-98 D co CCGG 51.880 -999.990 ... R5 2002 07 18 13 46 00 -40.6800 144.6800 164.00 94.00 70.00 41516 CGO 2002 05 31 03 05 00 379-91 D co CCGG 52.730 -999.990 ..I R5 2002 07 24 14 16 00 -40.6800 144.6800 164.00 94.00 70.00 41517 CGO 2002 05 31 03 05 00 380-91 D co CCGG 52.980 -999.990 ... R5 2002 07 24 14 29 00 -40.6800 144.6800 164.00 94.00 70.00 41518 CGO 2002 06 09 02 41 00 369-99 D co CCGG 57.270 -999.990 ..I R5 2002 07 24 13 50 00 -40.6800 144.6800 164.00 94.00 70.00 41519 CGO 2002 06 09 02 41 00 370-99 D co CCGG 56.780 -999.990 ... R5 2002 07 24 14 03 00 -40.6800 144.6800 164.00 94.00 70.00 41520 CGO 2002 06 13 03 56 00 4239-91 D co CCGG 56.880 -999.990 ... R5 2002 08 15 11 34 00 -40.6800 144.6800 164.00 94.00 70.00 41521 CGO 2002 06 13 03 56 00 4240-91 D co CCGG 57.160 -999.990 ..I R5 2002 08 15 11 47 00 -40.6800 144.6800 164.00 94.00 70.00 41522 CGO 2002 06 21 02 45 00 1453-91 D co CCGG 58.090 -999.990 ..I R5 2002 08 15 12 54 00 -40.6800 144.6800 164.00 94.00 70.00 41523 CGO 2002 06 21 02 45 00 1454-91 D co CCGG 57.670 -999.990 ... R5 2002 08 15 13 08 00 -40.6800 144.6800 164.00 94.00 70.00 41524 CGO 2002 06 26 02 39 00 132-98 D co CCGG 57.240 -999.990 ... R5 2002 09 26 11 43 00 -40.6800 144.6800 164.00 94.00 70.00 41525 CGO 2002 07 01 03 52 00 1443-91 D co CCGG 57.740 -999.990 ... R5 2002 09 26 12 51 00 -40.6800 144.6800 164.00 94.00 70.00 41526 CGO 2002 07 01 03 52 00 1444-91 D co CCGG 76.850 -999.990 N.I R5 2002 09 26 13 04 00 -40.6800 144.6800 164.00 94.00 70.00 41527 CGO 2002 07 10 03 55 00 4237-91 D co CCGG 61.170 -999.990 ..I R5 2002 09 18 11 04 00 -40.6800 144.6800 164.00 94.00 70.00 41528 CGO 2002 07 10 03 55 00 4238-91 D co CCGG 60.070 -999.990 ... R5 2002 09 18 11 17 00 -40.6800 144.6800 164.00 94.00 70.00 41529 CGO 2002 07 17 02 35 00 4375-91 D co CCGG 60.170 -999.990 ... R5 2002 09 17 16 41 00 -40.6800 144.6800 164.00 94.00 70.00 41530 CGO 2002 07 17 02 35 00 4376-91 D co CCGG 60.250 -999.990 ..I R5 2002 09 17 16 54 00 -40.6800 144.6800 164.00 94.00 70.00 41531 CGO 2002 07 23 04 34 00 631-99 D co CCGG 70.330 -999.990 .XI R5 2002 12 17 13 59 00 -40.6800 144.6800 164.00 94.00 70.00 41532 CGO 2002 07 23 04 34 00 632-99 D co CCGG 69.430 -999.990 .X. R5 2002 12 17 14 12 00 -40.6800 144.6800 164.00 94.00 70.00 41533 CGO 2002 08 06 02 59 00 633-99 D co CCGG 63.240 -999.990 ..I R5 2002 12 17 14 25 00 -40.6800 144.6800 164.00 94.00 70.00 41534 CGO 2002 08 06 02 59 00 634-99 D co CCGG 62.340 -999.990 ... R5 2002 12 17 14 38 00 -40.6800 144.6800 164.00 94.00 70.00 41535 CGO 2002 08 12 04 45 00 4045-91 D co CCGG 63.380 -999.990 ..I R5 2002 12 16 13 35 00 -40.6800 144.6800 164.00 94.00 70.00 41536 CGO 2002 08 12 04 45 00 4046-91 D co CCGG 61.850 -999.990 ... R5 2002 12 16 13 48 00 -40.6800 144.6800 164.00 94.00 70.00 41537 CGO 2002 08 22 04 20 00 1465-91 D co CCGG 65.860 -999.990 ..I R5 2002 12 16 14 53 00 -40.6800 144.6800 164.00 94.00 70.00 41538 CGO 2002 08 22 04 20 00 1466-91 D co CCGG 64.780 -999.990 ... R5 2002 12 16 15 06 00 -40.6800 144.6800 164.00 94.00 70.00 41539 CGO 2002 09 04 04 47 00 4955-91 D co CCGG 68.160 -999.990 ..I R5 2002 12 10 16 49 00 -40.6800 144.6800 164.00 94.00 70.00 41540 CGO 2002 09 04 04 47 00 4956-91 D co CCGG 66.580 -999.990 ... R5 2002 12 10 17 02 00 -40.6800 144.6800 164.00 94.00 70.00 41541 CGO 2002 09 10 03 33 00 431-99 D co CCGG 65.050 -999.990 ..I R5 2002 12 10 15 31 00 -40.6800 144.6800 164.00 94.00 70.00 41542 CGO 2002 09 10 03 33 00 432-99 D co CCGG 64.540 -999.990 ... R5 2002 12 10 15 44 00 -40.6800 144.6800 164.00 94.00 70.00 41543 CGO 2002 09 18 03 51 00 475-99 D co CCGG 66.770 -999.990 ... R5 2003 07 01 10 19 00 -40.6800 144.6800 164.00 94.00 70.00 41544 CGO 2002 09 18 03 51 00 476-99 D co CCGG 68.790 -999.990 ..I R5 2003 07 01 10 32 00 -40.6800 144.6800 164.00 94.00 70.00 41545 CGO 2002 09 26 02 21 00 4971-91 D co CCGG 70.570 -999.990 ..I R5 2003 07 01 09 51 00 -40.6800 144.6800 164.00 94.00 70.00 41546 CGO 2002 09 26 02 21 00 4972-91 D co CCGG 69.980 -999.990 ... R5 2003 07 01 10 04 00 -40.6800 144.6800 164.00 94.00 70.00 41547 CGO 2002 10 08 02 19 00 4241-91 D co CCGG 69.120 -999.990 ... R5 2003 04 28 13 30 00 -40.6800 144.6800 164.00 94.00 70.00 41548 CGO 2002 10 08 02 19 00 4242-91 D co CCGG 69.600 -999.990 ..I R5 2003 04 28 13 43 00 -40.6800 144.6800 164.00 94.00 70.00 41549 CGO 2002 10 16 00 48 00 2017-91 D co CCGG 70.710 -999.990 ... R5 2003 04 28 13 56 00 -40.6800 144.6800 164.00 94.00 70.00 41550 CGO 2002 10 16 00 48 00 2018-91 D co CCGG 70.760 -999.990 ..I R5 2003 04 28 14 09 00 -40.6800 144.6800 164.00 94.00 70.00 41551 CGO 2002 10 21 03 02 00 4383-91 D co CCGG 76.130 -999.990 N.I R5 2003 03 25 12 44 00 -40.6800 144.6800 164.00 94.00 70.00 41552 CGO 2002 10 21 03 02 00 4384-91 D co CCGG 70.250 -999.990 ... R5 2003 03 25 12 57 00 -40.6800 144.6800 164.00 94.00 70.00 41553 CGO 2002 10 28 01 46 00 621-91 D co CCGG 69.740 -999.990 N.I R5 2003 03 25 11 52 00 -40.6800 144.6800 164.00 94.00 70.00 41554 CGO 2002 10 28 01 46 00 622-91 D co CCGG 66.290 -999.990 ... R5 2003 03 25 12 05 00 -40.6800 144.6800 164.00 94.00 70.00 41555 CGO 2002 11 05 23 55 00 159-98 D co CCGG 66.710 -999.990 ... R5 2003 04 24 16 03 00 -40.6800 144.6800 164.00 94.00 70.00 41556 CGO 2002 11 05 23 55 00 160-98 D co CCGG 68.970 -999.990 ..I R5 2003 04 24 16 16 00 -40.6800 144.6800 164.00 94.00 70.00 41557 CGO 2002 11 13 01 18 00 4689-91 D co CCGG 64.150 -999.990 ... R5 2003 04 24 16 29 00 -40.6800 144.6800 164.00 94.00 70.00 41558 CGO 2002 11 13 01 18 00 4690-91 D co CCGG 63.800 -999.990 ..I R5 2003 04 24 16 42 00 -40.6800 144.6800 164.00 94.00 70.00 41559 CGO 2002 11 22 03 09 00 369-91 D co CCGG 61.120 -999.990 ... R5 2003 05 08 15 24 00 -40.6800 144.6800 164.00 94.00 70.00 41560 CGO 2002 11 22 03 09 00 370-91 D co CCGG 61.180 -999.990 ..I R5 2003 05 08 15 37 00 -40.6800 144.6800 164.00 94.00 70.00 41561 CGO 2002 11 26 03 15 00 181-99 D co CCGG 64.120 -999.990 ... R5 2003 05 08 14 58 00 -40.6800 144.6800 164.00 94.00 70.00 41562 CGO 2002 11 26 03 15 00 182-99 D co CCGG 63.270 -999.990 ... R5 2003 05 08 15 11 00 -40.6800 144.6800 164.00 94.00 70.00 41563 CGO 2002 12 05 01 57 00 4719-91 D co CCGG 59.560 -999.990 ... R5 2003 06 11 14 33 00 -40.6800 144.6800 164.00 94.00 70.00 41564 CGO 2002 12 05 01 57 00 4720-91 D co CCGG 58.760 -999.990 ..I R5 2003 06 11 14 46 00 -40.6800 144.6800 164.00 94.00 70.00 41565 CGO 2002 12 11 02 35 00 345-91 D co CCGG 58.150 -999.990 ..I R5 2003 06 11 14 07 00 -40.6800 144.6800 164.00 94.00 70.00 41566 CGO 2002 12 11 02 35 00 346-91 D co CCGG 56.340 -999.990 ... R5 2003 06 11 14 20 00 -40.6800 144.6800 164.00 94.00 70.00 41567 CGO 2002 12 23 03 23 00 4655-91 D co CCGG 54.150 -999.990 ..I R5 2003 06 12 10 00 00 -40.6800 144.6800 164.00 94.00 70.00 41568 CGO 2002 12 23 03 23 00 4656-91 D co CCGG 52.630 -999.990 ... R5 2003 06 12 10 13 00 -40.6800 144.6800 164.00 94.00 70.00 41569 CGO 2003 01 03 04 32 00 709-91 D co CCGG 50.940 -999.990 ... R5 2003 06 12 09 33 00 -40.6800 144.6800 164.00 94.00 70.00 41570 CGO 2003 01 03 04 32 00 710-91 D co CCGG 57.180 -999.990 N.I R5 2003 06 12 09 47 00 -40.6800 144.6800 164.00 94.00 70.00 41571 CGO 2003 01 14 04 04 00 455-99 D co CCGG 46.680 -999.990 ... R5 2003 03 26 11 35 00 -40.6800 144.6800 164.00 94.00 70.00 41572 CGO 2003 01 14 04 04 00 456-99 D co CCGG 53.880 -999.990 N.I R5 2003 03 26 11 48 00 -40.6800 144.6800 164.00 94.00 70.00 41573 CGO 2003 01 21 04 46 00 1649-91 D co CCGG 53.000 -999.990 P.I R5 2003 03 26 11 08 00 -40.6800 144.6800 164.00 94.00 70.00 41574 CGO 2003 01 21 04 46 00 1650-91 D co CCGG 45.790 -999.990 ... R5 2003 03 26 11 21 00 -40.6800 144.6800 164.00 94.00 70.00 41575 CGO 2003 01 30 05 12 00 109-91 D co CCGG 45.990 -999.990 ... R5 2003 06 30 14 27 00 -40.6800 144.6800 164.00 94.00 70.00 41576 CGO 2003 02 13 01 14 00 1801-91 D co CCGG 47.590 -999.990 ..I R5 2003 06 26 12 19 00 -40.6800 144.6800 164.00 94.00 70.00 41577 CGO 2003 02 13 01 14 00 1802-91 D co CCGG 45.400 -999.990 ... R5 2003 06 26 12 32 00 -40.6800 144.6800 164.00 94.00 70.00 41578 CGO 2003 02 18 02 51 00 219-91 D co CCGG 46.350 -999.990 ... R5 2003 06 26 13 37 00 -40.6800 144.6800 164.00 94.00 70.00 41579 CGO 2003 02 18 02 51 00 220-91 D co CCGG 46.550 -999.990 ..I R5 2003 06 26 13 50 00 -40.6800 144.6800 164.00 94.00 70.00 41580 CGO 2003 02 26 02 37 00 279-91 D co CCGG 50.770 -999.990 ..I R5 2003 06 26 13 11 00 -40.6800 144.6800 164.00 94.00 70.00 41581 CGO 2003 02 26 02 37 00 280-91 D co CCGG 49.560 -999.990 ... R5 2003 06 26 13 24 00 -40.6800 144.6800 164.00 94.00 70.00 41582 CGO 2003 03 04 01 33 00 6063-66 D co CCGG 50.660 -999.990 N.I R5 2003 07 23 15 54 00 -40.6800 144.6800 164.00 94.00 70.00 41583 CGO 2003 03 04 01 33 00 6064-66 D co CCGG 45.970 -999.990 ... R5 2003 07 23 16 07 00 -40.6800 144.6800 164.00 94.00 70.00 41584 CGO 2003 03 13 02 22 00 6921-66 D co CCGG 50.660 -999.990 ..I R5 2003 07 23 16 22 00 -40.6800 144.6800 164.00 94.00 70.00 41585 CGO 2003 03 13 02 22 00 6922-66 D co CCGG 47.990 -999.990 ... R5 2003 07 23 16 35 00 -40.6800 144.6800 164.00 94.00 70.00 41586 CGO 2003 03 20 04 44 00 1203-91 D co CCGG 47.070 -999.990 ... R5 2003 04 16 13 45 00 -40.6800 144.6800 164.00 94.00 70.00 41587 CGO 2003 03 20 04 44 00 1204-91 D co CCGG 46.210 -999.990 ... R5 2003 04 16 13 58 00 -40.6800 144.6800 164.00 94.00 70.00 41588 CGO 2003 03 31 06 34 00 4627-91 D co CCGG 47.100 -999.990 ... R5 2003 04 16 14 11 00 -40.6800 144.6800 164.00 94.00 70.00 41589 CGO 2003 03 31 06 34 00 4628-91 D co CCGG 46.540 -999.990 ... R5 2003 04 16 14 24 00 -40.6800 144.6800 164.00 94.00 70.00 41590 CGO 2003 04 08 04 59 00 81-99 D co CCGG 50.730 -999.990 Z.I R5 2003 10 31 14 00 00 -40.6800 144.6800 164.00 94.00 70.00 41591 CGO 2003 04 08 04 59 00 81-99 D co CCGG 137.510 -999.990 Z.I R5 2003 11 13 10 46 00 -40.6800 144.6800 164.00 94.00 70.00 41591 CGO 2003 04 08 04 59 00 82-99 D co CCGG 50.620 -999.990 Z.. R5 2003 10 31 14 13 00 -40.6800 144.6800 164.00 94.00 70.00 41592 CGO 2003 04 08 04 59 00 82-99 D co CCGG 136.950 -999.990 Z.. R5 2003 11 13 10 59 00 -40.6800 144.6800 164.00 94.00 70.00 41592 CGO 2003 04 15 04 44 00 915-99 D co CCGG 47.450 -999.990 ... R5 2003 10 31 13 34 00 -40.6800 144.6800 164.00 94.00 70.00 41593 CGO 2003 04 15 04 44 00 916-99 D co CCGG 47.790 -999.990 ..I R5 2003 10 31 13 47 00 -40.6800 144.6800 164.00 94.00 70.00 41594 CGO 2003 04 30 06 21 00 1487-91 D co CCGG -999.990 -999.990 *.. R5 2003 09 05 10 30 00 -40.6800 144.6800 164.00 94.00 70.00 41595 CGO 2003 04 30 06 21 00 1488-91 D co CCGG -999.990 -999.990 *.I R5 2003 09 05 10 43 00 -40.6800 144.6800 164.00 94.00 70.00 41596 CGO 2003 05 09 05 15 00 1727-91 D co CCGG -999.990 -999.990 *.I R5 2003 09 05 10 02 00 -40.6800 144.6800 164.00 94.00 70.00 41597 CGO 2003 05 09 05 15 00 1728-91 D co CCGG -999.990 -999.990 *.. R5 2003 09 05 10 15 00 -40.6800 144.6800 164.00 94.00 70.00 41598 CGO 2003 05 21 03 50 00 1311-99 D co CCGG 54.170 -999.990 ..I R5 2003 10 30 15 46 00 -40.6800 144.6800 164.00 94.00 70.00 41599 CGO 2003 05 21 03 50 00 1312-99 D co CCGG 53.520 -999.990 ... R5 2003 10 30 16 00 00 -40.6800 144.6800 164.00 94.00 70.00 41600 CGO 2003 05 28 05 00 00 1313-99 D co CCGG 55.560 -999.990 ... R5 2003 10 30 14 28 00 -40.6800 144.6800 164.00 94.00 70.00 41601 CGO 2003 05 28 05 00 00 1314-99 D co CCGG 59.870 -999.990 N.I R5 2003 10 30 14 41 00 -40.6800 144.6800 164.00 94.00 70.00 41602 CGO 2003 06 03 05 28 00 1317-99 D co CCGG 54.860 -999.990 ... R5 2003 10 31 17 32 00 -40.6800 144.6800 164.00 94.00 70.00 41603 CGO 2003 06 03 05 28 00 1318-99 D co CCGG 56.490 -999.990 ..I R5 2003 10 31 17 45 00 -40.6800 144.6800 164.00 94.00 70.00 41604 CGO 2003 06 13 05 53 00 1315-99 D co CCGG 59.630 -999.990 N.I R5 2003 10 31 17 58 00 -40.6800 144.6800 164.00 94.00 70.00 41605 CGO 2003 06 13 05 53 00 1316-99 D co CCGG 55.320 -999.990 ... R5 2003 10 31 18 11 00 -40.6800 144.6800 164.00 94.00 70.00 41606 CGO 2003 06 19 04 38 00 1000-99 D co CCGG 55.080 -999.990 ... R5 2003 10 31 17 19 00 -40.6800 144.6800 164.00 94.00 70.00 41608 CGO 2003 06 19 04 38 00 999-99 D co CCGG 57.260 -999.990 ..I R5 2003 10 31 17 06 00 -40.6800 144.6800 164.00 94.00 70.00 41607 CGO 2003 06 23 06 50 00 1005-99 D co CCGG 56.910 -999.990 ... R5 2003 10 31 16 40 00 -40.6800 144.6800 164.00 94.00 70.00 41609 CGO 2003 06 23 06 50 00 1006-99 D co CCGG 57.380 -999.990 ..I R5 2003 10 31 16 53 00 -40.6800 144.6800 164.00 94.00 70.00 41610 CGO 2003 07 08 04 58 00 1161-99 D co CCGG 57.500 -999.990 ... R5 2003 11 13 12 58 00 -40.6800 144.6800 164.00 94.00 70.00 41611 CGO 2003 07 08 04 58 00 1162-99 D co CCGG 60.370 -999.990 ..I R5 2003 11 13 13 11 00 -40.6800 144.6800 164.00 94.00 70.00 41612 CGO 2003 07 16 06 23 00 1475-99 D co CCGG 59.870 -999.990 ..I R5 2003 11 13 13 24 00 -40.6800 144.6800 164.00 94.00 70.00 41613 CGO 2003 07 16 06 23 00 1476-99 D co CCGG 57.510 -999.990 ... R5 2003 11 13 13 37 00 -40.6800 144.6800 164.00 94.00 70.00 41614 CGO 2003 07 25 01 38 00 4735-91 D co CCGG 61.340 -999.990 ..I R5 2003 11 13 12 04 00 -40.6800 144.6800 164.00 94.00 70.00 41615 CGO 2003 07 25 01 38 00 4736-91 D co CCGG 59.010 -999.990 ... R5 2003 11 13 12 17 00 -40.6800 144.6800 164.00 94.00 70.00 41616 CGO 2003 08 14 03 30 00 909-99 D co CCGG 63.390 -999.990 ..I R5 2003 11 13 12 32 00 -40.6800 144.6800 164.00 94.00 70.00 41617 CGO 2003 08 14 03 30 00 910-99 D co CCGG 62.200 -999.990 ..I R5 2003 11 13 12 45 00 -40.6800 144.6800 164.00 94.00 70.00 41618 CGO 2003 08 25 02 40 00 25-91 D co CCGG 63.680 -999.990 ... R5 2003 12 23 12 18 00 -40.6800 144.6800 164.00 94.00 70.00 41619 CGO 2003 08 25 02 40 00 26-91 D co CCGG 64.600 -999.990 ..I R5 2003 12 23 12 31 00 -40.6800 144.6800 164.00 94.00 70.00 41620 CGO 2003 09 01 03 05 00 4061-91 D co CCGG 64.570 -999.990 ..I R5 2003 12 23 12 44 00 -40.6800 144.6800 164.00 94.00 70.00 41621 CGO 2003 09 01 03 05 00 4062-91 D co CCGG 65.880 -999.990 ... R5 2003 12 23 12 58 00 -40.6800 144.6800 164.00 94.00 70.00 41622 CGO 2003 09 05 02 10 00 47-91 D co CCGG 68.370 -999.990 ..I R5 2003 12 22 10 02 00 -40.6800 144.6800 164.00 94.00 70.00 41623 CGO 2003 09 05 02 10 00 48-91 D co CCGG 67.390 -999.990 ... R5 2003 12 22 10 15 00 -40.6800 144.6800 164.00 94.00 70.00 41624 CGO 2003 09 17 04 59 00 311-99 D co CCGG 72.320 -999.990 ..I R5 2003 12 18 16 13 00 -40.6800 144.6800 164.00 94.00 70.00 41625 CGO 2003 09 17 04 59 00 312-99 D co CCGG 72.000 -999.990 ... R5 2003 12 18 16 26 00 -40.6800 144.6800 164.00 94.00 70.00 41626 CGO 2003 09 26 05 53 00 1319-99 D co CCGG 65.360 -999.990 ..I R5 2003 12 29 12 26 00 -40.6800 144.6800 164.00 94.00 70.00 41627 CGO 2003 09 26 05 53 00 1320-99 D co CCGG 65.580 -999.990 ... R5 2003 12 29 12 39 00 -40.6800 144.6800 164.00 94.00 70.00 41628 CGO 2003 10 03 04 58 00 1309-99 D co CCGG 80.100 -999.990 N.I R5 2003 12 29 12 52 00 -40.6800 144.6800 164.00 94.00 70.00 41629 CGO 2003 10 03 04 58 00 1310-99 D co CCGG 67.340 -999.990 ... R5 2003 12 29 13 05 00 -40.6800 144.6800 164.00 94.00 70.00 41630 CGO 2003 10 08 01 08 00 1275-91 D co CCGG 65.370 -999.990 ... R5 2004 01 08 11 54 00 -40.6800 144.6800 164.00 94.00 70.00 41631 CGO 2003 10 08 01 08 00 1276-91 D co CCGG 66.080 -999.990 ..I R5 2004 01 08 12 07 00 -40.6800 144.6800 164.00 94.00 70.00 41632 CGO 2003 10 21 01 59 00 1641-99 D co CCGG 64.470 -999.990 ..I R5 2004 01 08 11 28 00 -40.6800 144.6800 164.00 94.00 70.00 41633 CGO 2003 10 21 01 59 00 1642-99 D co CCGG 63.040 -999.990 ... R5 2004 01 08 11 41 00 -40.6800 144.6800 164.00 94.00 70.00 41634 CGO 2003 11 05 03 35 00 1035-99 D co CCGG 63.400 -999.990 ..I R5 2003 12 23 14 31 00 -40.6800 144.6800 164.00 94.00 70.00 41635 CGO 2003 11 05 03 35 00 1036-99 D co CCGG 61.780 -999.990 ... R5 2003 12 23 14 44 00 -40.6800 144.6800 164.00 94.00 70.00 41636 CGO 2003 11 06 04 57 00 59-99 D co CCGG 60.430 -999.990 ... R5 2003 12 23 13 11 00 -40.6800 144.6800 164.00 94.00 70.00 41637 CGO 2003 11 06 04 57 00 60-99 D co CCGG 62.240 -999.990 ..I R5 2003 12 23 13 24 00 -40.6800 144.6800 164.00 94.00 70.00 41638 CGO 2003 11 11 04 41 00 979-99 D co CCGG 65.110 -999.990 ... R5 2004 02 04 15 16 00 -40.6800 144.6800 164.00 94.00 70.00 41639 CGO 2003 11 11 04 41 00 980-99 D co CCGG 67.210 -999.990 ..I R5 2004 02 04 15 29 00 -40.6800 144.6800 164.00 94.00 70.00 41640 CGO 2003 11 26 04 46 00 4451-91 D co CCGG 62.600 -999.990 ..I R5 2004 02 04 14 50 00 -40.6800 144.6800 164.00 94.00 70.00 41641 CGO 2003 11 26 04 46 00 4452-91 D co CCGG 60.070 -999.990 ... R5 2004 02 04 15 03 00 -40.6800 144.6800 164.00 94.00 70.00 41642 CGO 2003 12 01 03 11 00 6291-66 D co CCGG 55.800 -999.990 ..I R5 2004 02 17 11 05 00 -40.6800 144.6800 164.00 94.00 70.00 41643 CGO 2003 12 01 03 11 00 6292-66 D co CCGG 54.330 -999.990 ... R5 2004 02 17 11 18 00 -40.6800 144.6800 164.00 94.00 70.00 41644 CGO 2003 12 13 03 04 00 2253-99 D co CCGG 51.290 -999.990 ... R5 2004 02 17 10 39 00 -40.6800 144.6800 164.00 94.00 70.00 41645 CGO 2003 12 13 03 04 00 2254-99 D co CCGG 53.830 -999.990 ..I R5 2004 02 17 10 52 00 -40.6800 144.6800 164.00 94.00 70.00 41646 CGO 2003 12 19 04 13 00 1509-91 D co CCGG 52.930 -999.990 ... R5 2004 02 12 14 04 00 -40.6800 144.6800 164.00 94.00 70.00 41647 CGO 2003 12 19 04 13 00 1510-91 D co CCGG 53.720 -999.990 ..I R5 2004 02 12 14 17 00 -40.6800 144.6800 164.00 94.00 70.00 41648 CGO 2003 12 23 05 39 00 4407-91 D co CCGG 49.880 -999.990 ..I R5 2004 02 12 13 38 00 -40.6800 144.6800 164.00 94.00 70.00 41649 CGO 2003 12 23 05 39 00 4408-91 D co CCGG 48.640 -999.990 ... R5 2004 02 12 13 51 00 -40.6800 144.6800 164.00 94.00 70.00 41650 CGO 2004 01 07 03 36 00 2485-99 D co CCGG 45.260 -999.990 ... R5 2004 03 16 17 01 00 -40.6800 144.6800 164.00 94.00 70.00 41651 CGO 2004 01 14 04 14 00 1523-99 D co CCGG 44.480 -999.990 ..I R5 2004 03 16 16 35 00 -40.6800 144.6800 164.00 94.00 70.00 41652 CGO 2004 01 14 04 14 00 1524-99 D co CCGG 43.890 -999.990 ... R5 2004 03 16 16 48 00 -40.6800 144.6800 164.00 94.00 70.00 41653 CGO 2004 01 14 04 23 00 2484-99 D co CCGG 45.070 -999.990 ... R5 2004 03 16 17 14 00 -40.6800 144.6800 164.00 94.00 70.00 41654 CGO 2004 01 22 04 07 00 2113-99 D co CCGG 39.550 -999.990 ..C R5 2004 03 16 16 09 00 -40.6800 144.6800 164.00 94.00 70.00 41655 CGO 2004 01 22 04 07 00 2114-99 D co CCGG 39.650 -999.990 ..I R5 2004 03 16 16 22 00 -40.6800 144.6800 164.00 94.00 70.00 41656 CGO 2004 02 02 04 31 00 2477-99 D co CCGG 43.390 -999.990 ..C R5 2004 05 14 09 42 00 -40.6800 144.6800 164.00 94.00 70.00 41657 CGO 2004 02 02 04 31 00 2478-99 D co CCGG 41.250 -999.990 ... R5 2004 05 14 09 55 00 -40.6800 144.6800 164.00 94.00 70.00 41658 CGO 2004 02 13 02 48 00 1757-99 D co CCGG 40.220 -999.990 ... R5 2004 05 14 10 08 00 -40.6800 144.6800 164.00 94.00 70.00 41659 CGO 2004 02 13 02 48 00 1758-99 D co CCGG 40.710 -999.990 ..I R5 2004 05 14 10 22 00 -40.6800 144.6800 164.00 94.00 70.00 41660 CGO 2004 02 18 05 05 00 2820-99 D co CCGG 39.180 -999.990 ... R5 2004 05 13 16 09 00 -40.6800 144.6800 164.00 94.00 70.00 41661 CGO 2004 02 23 03 05 00 2821-99 D co CCGG 37.740 -999.990 ..C R5 2004 05 14 09 16 00 -40.6800 144.6800 164.00 94.00 70.00 41662 CGO 2004 02 23 03 05 00 2822-99 D co CCGG 40.520 -999.990 ..I R5 2004 05 14 09 29 00 -40.6800 144.6800 164.00 94.00 70.00 41663 CGO 2004 03 01 03 07 00 2923-99 D co CCGG 38.180 -999.990 ..C R5 2004 05 13 14 10 00 -40.6800 144.6800 164.00 94.00 70.00 41664 CGO 2004 03 01 03 07 00 2924-99 D co CCGG 39.200 -999.990 ..C R5 2004 05 13 14 23 00 -40.6800 144.6800 164.00 94.00 70.00 41665 CGO 2004 03 05 05 09 00 2903-99 D co CCGG 39.490 -999.990 ..C R5 2004 05 13 14 36 00 -40.6800 144.6800 164.00 94.00 70.00 41666 CGO 2004 03 05 05 09 00 2904-99 D co CCGG 38.840 -999.990 ..C R5 2004 05 13 14 49 00 -40.6800 144.6800 164.00 94.00 70.00 41667 CGO 2004 03 12 02 56 00 2131-99 D co CCGG 42.550 -999.990 ..I R5 2004 05 13 15 29 00 -40.6800 144.6800 164.00 94.00 70.00 41668 CGO 2004 03 12 02 56 00 2132-99 D co CCGG 40.490 -999.990 ... R5 2004 05 13 15 42 00 -40.6800 144.6800 164.00 94.00 70.00 41669 CGO 2004 03 19 02 45 00 6637-66 D co CCGG 46.240 -999.990 ... R5 2004 05 13 15 02 00 -40.6800 144.6800 164.00 94.00 70.00 41670 CGO 2004 03 19 02 45 00 6638-66 D co CCGG 48.660 -999.990 ..I R5 2004 05 13 15 15 00 -40.6800 144.6800 164.00 94.00 70.00 41671 CGO 2004 03 26 01 16 00 1171-99 D co CCGG 41.950 -999.990 ..I R5 2004 07 09 10 28 00 -40.6800 144.6800 164.00 94.00 70.00 41672 CGO 2004 03 26 01 16 00 1172-99 D co CCGG 41.320 -999.990 ... R5 2004 07 09 10 41 00 -40.6800 144.6800 164.00 94.00 70.00 41673 CGO 2004 04 01 05 25 00 2475-99 D co CCGG 41.500 -999.990 ... R5 2004 07 09 10 00 00 -40.6800 144.6800 164.00 94.00 70.00 41674 CGO 2004 04 01 05 25 00 2476-99 D co CCGG 42.580 -999.990 ..I R5 2004 07 09 10 13 00 -40.6800 144.6800 164.00 94.00 70.00 41675 CGO 2004 04 06 05 04 00 1737-99 D co CCGG 44.740 -999.990 ..I R5 2004 07 27 16 37 00 -40.6800 144.6800 164.00 94.00 70.00 41676 CGO 2004 04 06 05 04 00 1738-99 D co CCGG 43.510 -999.990 ... R5 2004 07 27 16 50 00 -40.6800 144.6800 164.00 94.00 70.00 41677 CGO 2004 04 23 04 07 00 837-99 D co CCGG 52.340 -999.990 N.I R5 2004 07 09 10 54 00 -40.6800 144.6800 164.00 94.00 70.00 41678 CGO 2004 04 23 04 07 00 838-99 D co CCGG 47.450 -999.990 ... R5 2004 07 09 11 07 00 -40.6800 144.6800 164.00 94.00 70.00 41679 CGO 2004 04 30 05 27 00 2295-99 D co CCGG 48.650 -999.990 ..I R5 2004 06 14 13 08 00 -40.6800 144.6800 164.00 94.00 70.00 41680 CGO 2004 04 30 05 27 00 2296-99 D co CCGG 46.140 -999.990 ... R5 2004 06 14 13 21 00 -40.6800 144.6800 164.00 94.00 70.00 41681 CGO 2004 05 04 03 48 00 821-91 D co CCGG 46.210 -999.990 ... R5 2004 06 15 09 25 00 -40.6800 144.6800 164.00 94.00 70.00 41682 CGO 2004 05 04 03 48 00 822-91 D co CCGG 47.700 -999.990 ..I R5 2004 06 15 09 38 00 -40.6800 144.6800 164.00 94.00 70.00 41683 CGO 2004 05 19 04 02 00 165-99 D co CCGG 52.830 -999.990 ..I R5 2004 08 24 19 12 00 -40.6800 144.6800 164.00 94.00 70.00 41684 CGO 2004 05 19 04 02 00 166-99 D co CCGG 51.660 -999.990 ... R5 2004 08 24 19 25 00 -40.6800 144.6800 164.00 94.00 70.00 41685 CGO 2004 05 25 05 13 00 3189-99 D co CCGG 54.180 -999.990 ... R5 2004 08 24 20 04 00 -40.6800 144.6800 164.00 94.00 70.00 41686 CGO 2004 05 25 05 13 00 3190-99 D co CCGG 53.910 -999.990 ..I R5 2004 08 24 20 17 00 -40.6800 144.6800 164.00 94.00 70.00 41687 CGO 2004 05 28 02 10 00 2065-99 D co CCGG 53.430 -999.990 ..I R5 2004 08 24 19 38 00 -40.6800 144.6800 164.00 94.00 70.00 41688 CGO 2004 05 28 02 10 00 2066-99 D co CCGG 51.210 -999.990 ... R5 2004 08 24 19 51 00 -40.6800 144.6800 164.00 94.00 70.00 41689 CGO 2004 06 02 05 35 00 1313-99 D co CCGG 52.600 -999.990 ... R5 2004 08 24 18 46 00 -40.6800 144.6800 164.00 94.00 70.00 41690 CGO 2004 06 02 05 35 00 1314-99 D co CCGG 54.200 -999.990 ..I R5 2004 08 24 18 59 00 -40.6800 144.6800 164.00 94.00 70.00 41691 CGO 2004 06 10 03 39 00 57-91 D co CCGG 54.410 -999.990 ..I R5 2004 08 24 15 40 00 -40.6800 144.6800 164.00 94.00 70.00 41692 CGO 2004 06 10 03 39 00 58-91 D co CCGG 52.410 -999.990 ... R5 2004 08 24 15 53 00 -40.6800 144.6800 164.00 94.00 70.00 41693 CGO 2004 06 15 04 27 00 43-91 D co CCGG 58.890 -999.990 ... R5 2004 08 24 15 12 00 -40.6800 144.6800 164.00 94.00 70.00 41694 CGO 2004 06 15 04 27 00 44-91 D co CCGG 58.880 -999.990 ..I R5 2004 08 24 15 25 00 -40.6800 144.6800 164.00 94.00 70.00 41695 CGO 2004 06 21 02 05 00 2357-99 D co CCGG 57.320 -999.990 ..I R5 2004 08 25 10 56 00 -40.6800 144.6800 164.00 94.00 70.00 41696 CGO 2004 06 21 02 05 00 2358-99 D co CCGG 56.450 -999.990 ... R5 2004 08 25 11 09 00 -40.6800 144.6800 164.00 94.00 70.00 41697 CGO 2004 06 30 04 38 00 2345-99 D co CCGG 54.230 -999.990 ... R5 2004 08 25 10 30 00 -40.6800 144.6800 164.00 94.00 70.00 41698 CGO 2004 06 30 04 38 00 2346-99 D co CCGG 55.300 -999.990 ..I R5 2004 08 25 10 43 00 -40.6800 144.6800 164.00 94.00 70.00 41699 CGO 2004 07 05 04 54 00 6157-66 D co CCGG 56.740 -999.990 ..I R5 2004 08 25 10 02 00 -40.6800 144.6800 164.00 94.00 70.00 41700 CGO 2004 07 05 04 54 00 6158-66 D co CCGG 55.600 -999.990 ... R5 2004 08 25 10 15 00 -40.6800 144.6800 164.00 94.00 70.00 41701 CGO 2004 07 13 04 22 00 1233-99 D co CCGG 65.280 -999.990 N.I R5 2004 11 16 15 03 00 -40.6600 144.6600 164.00 94.00 70.00 191756 CGO 2004 07 13 04 22 00 1234-99 D co CCGG 57.430 -999.990 ... R5 2004 11 16 15 17 00 -40.6600 144.6600 164.00 94.00 70.00 191757 CGO 2004 07 19 06 04 00 289-99 D co CCGG 58.140 -999.990 ... R5 2004 11 16 14 34 00 -40.6600 144.6600 164.00 94.00 70.00 191762 CGO 2004 07 19 06 04 00 290-99 D co CCGG 67.800 -999.990 N.I R5 2004 11 16 14 49 00 -40.6600 144.6600 164.00 94.00 70.00 191763 CGO 2004 07 26 02 45 00 2545-99 D co CCGG 59.060 -999.990 ... R5 2004 11 16 11 41 00 -40.6600 144.6600 164.00 94.00 70.00 191758 CGO 2004 07 26 02 45 00 2546-99 D co CCGG 63.500 -999.990 N.I R5 2004 11 16 11 55 00 -40.6600 144.6600 164.00 94.00 70.00 191759 CGO 2004 08 03 04 59 00 3691-99 D co CCGG 69.140 -999.990 N.I R5 2004 11 16 12 09 00 -40.6600 144.6600 164.00 94.00 70.00 191760 CGO 2004 08 03 04 59 00 3692-99 D co CCGG 60.460 -999.990 ... R5 2004 11 16 12 24 00 -40.6600 144.6600 164.00 94.00 70.00 191761 CGO 2004 08 10 03 50 00 3125-99 D co CCGG 61.040 -999.990 ... R5 2004 12 10 13 17 00 -40.6600 144.6600 164.00 94.00 70.00 192792 CGO 2004 08 10 03 50 00 3126-99 D co CCGG 62.590 -999.990 ..I R5 2004 12 10 13 31 00 -40.6600 144.6600 164.00 94.00 70.00 192793 CGO 2004 08 31 00 55 00 925-99 D co CCGG 66.640 -999.990 ..I R5 2004 12 10 13 46 00 -40.6600 144.6600 164.00 94.00 70.00 192794 CGO 2004 08 31 00 55 00 926-99 D co CCGG 64.230 -999.990 ... R5 2004 12 10 14 00 00 -40.6600 144.6600 164.00 94.00 70.00 192795 CGO 2004 09 09 00 13 00 3541-99 D co CCGG 69.220 -999.990 ... R5 2004 12 13 11 46 00 -40.6600 144.6600 164.00 94.00 70.00 192800 CGO 2004 09 09 00 13 00 3542-99 D co CCGG 69.510 -999.990 ..I R5 2004 12 13 12 00 00 -40.6600 144.6600 164.00 94.00 70.00 192801 CGO 2004 09 13 00 08 00 323-99 D co CCGG 68.210 -999.990 ..I R5 2004 12 13 11 18 00 -40.6600 144.6600 164.00 94.00 70.00 192796 CGO 2004 09 13 00 08 00 324-99 D co CCGG 66.900 -999.990 ... R5 2004 12 13 11 32 00 -40.6600 144.6600 164.00 94.00 70.00 192797 CGO 2004 09 17 00 48 00 393-99 D co CCGG 65.930 -999.990 ... R5 2004 12 13 10 50 00 -40.6600 144.6600 164.00 94.00 70.00 192798 CGO 2004 09 17 00 48 00 394-99 D co CCGG 66.540 -999.990 ..I R5 2004 12 13 11 04 00 -40.6600 144.6600 164.00 94.00 70.00 192799 CGO 2004 09 23 02 36 00 6119-66 D co CCGG 71.410 -999.990 ..I R5 2004 12 13 12 14 00 -40.6600 144.6600 164.00 94.00 70.00 192802 CGO 2004 09 23 02 36 00 6120-66 D co CCGG 69.020 -999.990 ... R5 2004 12 13 12 29 00 -40.6600 144.6600 164.00 94.00 70.00 192803 CGO 2004 09 27 01 52 00 3611-99 D co CCGG 72.850 -999.990 N.I R5 2005 01 27 14 28 00 -40.6600 144.6600 164.00 94.00 70.00 194370 CGO 2004 09 27 01 52 00 3612-99 D co CCGG 68.920 -999.990 ... R5 2005 01 27 14 43 00 -40.6600 144.6600 164.00 94.00 70.00 194376 CGO 2004 10 04 00 08 00 73-99 D co CCGG 66.770 -999.990 ... R5 2005 01 27 14 00 00 -40.6600 144.6600 164.00 94.00 70.00 194379 CGO 2004 10 04 00 08 00 74-99 D co CCGG 67.800 -999.990 ..I R5 2005 01 27 14 14 00 -40.6600 144.6600 164.00 94.00 70.00 194380 CGO 2004 10 13 01 25 00 3187-99 D co CCGG 70.310 -999.990 ..I R5 2005 01 11 13 21 00 -40.6600 144.6600 164.00 94.00 70.00 193633 CGO 2004 10 13 01 25 00 3188-99 D co CCGG 70.430 -999.990 ... R5 2005 01 11 13 35 00 -40.6600 144.6600 164.00 94.00 70.00 193634 CGO 2004 10 25 01 10 00 2519-99 D co CCGG 65.580 -999.990 ... R5 2005 01 11 12 24 00 -40.6600 144.6600 164.00 94.00 70.00 193631 CGO 2004 10 25 01 10 00 2520-99 D co CCGG 65.510 -999.990 ... R5 2005 01 11 12 38 00 -40.6600 144.6600 164.00 94.00 70.00 193632 CGO 2004 10 28 23 00 00 381-99 D co CCGG 67.430 -999.990 ..I R5 2004 12 29 12 40 00 -40.6600 144.6600 164.00 94.00 70.00 193345 CGO 2004 10 28 23 00 00 382-99 D co CCGG 65.670 -999.990 ... R5 2004 12 29 12 54 00 -40.6600 144.6600 164.00 94.00 70.00 193346 CGO 2004 11 02 02 38 00 385-99 D co CCGG 68.330 -999.990 ..I R5 2004 12 29 13 08 00 -40.6600 144.6600 164.00 94.00 70.00 193347 CGO 2004 11 02 02 38 00 386-99 D co CCGG 66.480 -999.990 ... R5 2004 12 29 13 22 00 -40.6600 144.6600 164.00 94.00 70.00 193348 CGO 2004 11 08 00 11 00 3575-99 D co CCGG 67.090 -999.990 ..I R5 2005 01 26 15 18 00 -40.6600 144.6600 164.00 94.00 70.00 194375 CGO 2004 11 08 00 11 00 3576-99 D co CCGG 66.760 -999.990 ... R5 2005 01 26 15 32 00 -40.6600 144.6600 164.00 94.00 70.00 194369 CGO 2004 11 14 22 59 00 1177-99 D co CCGG 63.020 -999.990 ... R5 2005 01 26 15 46 00 -40.6600 144.6600 164.00 94.00 70.00 194367 CGO 2004 11 14 22 59 00 1178-99 D co CCGG 64.290 -999.990 ..I R5 2005 01 26 16 00 00 -40.6600 144.6600 164.00 94.00 70.00 194368 CGO 2004 11 30 01 04 00 469-99 D co CCGG 68.870 -999.990 .X. R5 2005 01 28 09 38 00 -40.6600 144.6600 164.00 94.00 70.00 194377 CGO 2004 11 30 01 04 00 470-99 D co CCGG 67.840 -999.990 .XI R5 2005 01 28 09 52 00 -40.6600 144.6600 164.00 94.00 70.00 194378 CGO 2004 12 14 02 32 00 2213-99 D co CCGG 55.260 -999.990 ..I R5 2005 01 28 09 10 00 -40.6600 144.6600 164.00 94.00 70.00 194382 CGO 2004 12 14 02 32 00 2214-99 D co CCGG 54.730 -999.990 ... R5 2005 01 28 09 24 00 -40.6600 144.6600 164.00 94.00 70.00 194381 CGO 2004 12 16 23 29 00 2499-99 D co CCGG 54.830 -999.990 ..I R5 2005 05 24 12 28 00 -40.6600 144.6600 164.00 94.00 70.00 199056 CGO 2004 12 16 23 29 00 2500-99 D co CCGG 53.960 -999.990 ... R5 2005 05 24 12 42 00 -40.6600 144.6600 164.00 94.00 70.00 199057 CGO 2004 12 20 01 13 00 2251-99 D co CCGG 52.530 -999.990 ... R5 2005 05 24 13 52 00 -40.6600 144.6600 164.00 94.00 70.00 199042 CGO 2004 12 20 01 13 00 2252-99 D co CCGG 53.480 -999.990 ..I R5 2005 05 24 14 07 00 -40.6600 144.6600 164.00 94.00 70.00 199043 CGO 2004 12 24 00 03 00 1447-99 D co CCGG 53.850 -999.990 ... R5 2005 08 04 14 34 00 -40.6600 144.6600 164.00 94.00 70.00 202567 CGO 2004 12 24 00 03 00 1448-99 D co CCGG 53.690 -999.990 ..I R5 2005 08 04 14 49 00 -40.6600 144.6600 164.00 94.00 70.00 202568 CGO 2005 01 05 01 24 00 1017-99 D co CCGG 56.220 -999.990 ..I R5 2005 08 04 14 06 00 -40.6600 144.6600 164.00 94.00 70.00 202569 CGO 2005 01 05 01 24 00 1018-99 D co CCGG 54.500 -999.990 ... R5 2005 08 04 14 20 00 -40.6600 144.6600 164.00 94.00 70.00 202570 CGO 2005 01 14 00 29 00 185-99 D co CCGG 46.270 -999.990 ... R5 2005 05 04 14 16 00 -40.6600 144.6600 164.00 94.00 70.00 198447 CGO 2005 01 14 00 29 00 186-99 D co CCGG 47.090 -999.990 ..I R5 2005 05 04 14 30 00 -40.6600 144.6600 164.00 94.00 70.00 198448 CGO 2005 01 17 00 15 00 1063-99 D co CCGG 47.780 -999.990 ..I R5 2005 05 04 13 48 00 -40.6600 144.6600 164.00 94.00 70.00 198449 CGO 2005 01 17 00 15 00 1064-99 D co CCGG 47.240 -999.990 ... R5 2005 05 04 14 02 00 -40.6600 144.6600 164.00 94.00 70.00 198450 CGO 2005 01 24 01 19 00 1693-99 D co CCGG 46.920 -999.990 ..I R5 2005 05 03 11 36 00 -40.6600 144.6600 164.00 94.00 70.00 198266 CGO 2005 01 24 01 19 00 1694-99 D co CCGG 45.630 -999.990 ... R5 2005 05 03 11 50 00 -40.6600 144.6600 164.00 94.00 70.00 198267 CGO 2005 02 09 01 46 00 201-99 D co CCGG 42.990 -999.990 ... R5 2005 05 03 11 07 00 -40.6600 144.6600 164.00 94.00 70.00 198264 CGO 2005 02 09 01 46 00 202-99 D co CCGG 44.560 -999.990 ..I R5 2005 05 03 11 21 00 -40.6600 144.6600 164.00 94.00 70.00 198265 CGO 2005 02 15 01 31 00 803-99 D co CCGG 43.440 -999.990 ... R5 2005 05 24 14 21 00 -40.6600 144.6600 164.00 94.00 70.00 199072 CGO 2005 02 15 01 31 00 804-99 D co CCGG 46.480 -999.990 ..I R5 2005 05 24 14 35 00 -40.6600 144.6600 164.00 94.00 70.00 199073 CGO 2005 02 25 01 10 00 851-99 D co CCGG 44.360 -999.990 ..I R5 2005 05 24 14 49 00 -40.6600 144.6600 164.00 94.00 70.00 199058 CGO 2005 02 25 01 10 00 852-99 D co CCGG 43.100 -999.990 ... R5 2005 05 24 15 03 00 -40.6600 144.6600 164.00 94.00 70.00 199059 CGO 2005 03 02 00 55 00 3573-99 D co CCGG 40.960 -999.990 ... R5 2005 05 11 16 04 00 -40.6600 144.6600 164.00 94.00 70.00 198673 CGO 2005 03 02 00 55 00 3574-99 D co CCGG 43.300 -999.990 ..I R5 2005 05 11 16 18 00 -40.6600 144.6600 164.00 94.00 70.00 198674 CGO 2005 03 07 00 34 00 925-99 D co CCGG 43.930 -999.990 ..I R5 2005 05 11 15 36 00 -40.6600 144.6600 164.00 94.00 70.00 198671 CGO 2005 03 07 00 34 00 926-99 D co CCGG 42.790 -999.990 ... R5 2005 05 11 15 50 00 -40.6600 144.6600 164.00 94.00 70.00 198672 CGO 2005 03 15 01 38 00 3512-99 D co CCGG 45.570 -999.990 ... R5 2005 06 16 13 03 00 -40.6600 144.6600 164.00 94.00 70.00 200055 CGO 2005 03 24 00 36 00 1133-99 D co CCGG 45.130 -999.990 ... R5 2005 06 16 13 18 00 -40.6600 144.6600 164.00 94.00 70.00 200056 CGO 2005 03 24 00 36 00 1134-99 D co CCGG 45.490 -999.990 ..I R5 2005 06 16 13 32 00 -40.6600 144.6600 164.00 94.00 70.00 200057 CGO 2005 04 06 04 12 00 4013-99 D co CCGG 46.250 -999.990 ... R5 2005 08 05 09 50 00 -40.6600 144.6600 164.00 94.00 70.00 202593 CGO 2005 04 06 04 12 00 4014-99 D co CCGG 46.850 -999.990 ..I R5 2005 08 05 10 04 00 -40.6600 144.6600 164.00 94.00 70.00 202594 CGO 2005 04 11 00 57 00 3051-99 D co CCGG 45.930 -999.990 ..I R5 2005 08 05 09 21 00 -40.6600 144.6600 164.00 94.00 70.00 202591 CGO 2005 04 11 00 57 00 3052-99 D co CCGG 44.740 -999.990 ... R5 2005 08 05 09 36 00 -40.6600 144.6600 164.00 94.00 70.00 202592 CGO 2005 04 18 02 41 00 149-99 D co CCGG 47.090 -999.990 ... R5 2005 08 05 08 53 00 -40.6600 144.6600 164.00 94.00 70.00 202589 CGO 2005 04 18 02 41 00 150-99 D co CCGG 47.840 -999.990 ..I R5 2005 08 05 09 07 00 -40.6600 144.6600 164.00 94.00 70.00 202590 CGO 2005 04 26 03 55 00 2463-99 D co CCGG 47.370 -999.990 ... R5 2005 08 04 15 03 00 -40.6600 144.6600 164.00 94.00 70.00 202587 CGO 2005 04 26 03 55 00 2464-99 D co CCGG 46.950 -999.990 ... R5 2005 08 04 15 17 00 -40.6600 144.6600 164.00 94.00 70.00 202588 CGO 2005 05 09 02 32 00 6469-66 D co CCGG 51.930 -999.990 ... R5 2005 08 04 13 09 00 -40.6600 144.6600 164.00 94.00 70.00 202565 CGO 2005 05 09 02 32 00 6470-66 D co CCGG 49.810 -999.990 ... R5 2005 08 04 13 23 00 -40.6600 144.6600 164.00 94.00 70.00 202566 CGO 2005 05 23 02 41 00 2803-99 D co CCGG 59.010 -999.990 .X. R5 2005 08 04 13 37 00 -40.6600 144.6600 164.00 94.00 70.00 202563 CGO 2005 05 23 02 41 00 2804-99 D co CCGG 60.100 -999.990 .XI R5 2005 08 04 13 52 00 -40.6600 144.6600 164.00 94.00 70.00 202564 CGO 2005 05 26 00 02 00 405-99 D co CCGG 55.250 -999.990 ..I R5 2005 10 11 10 12 00 -40.6600 144.6600 164.00 94.00 70.00 206482 CGO 2005 05 26 00 02 00 406-99 D co CCGG 53.120 -999.990 ... R5 2005 10 11 10 26 00 -40.6600 144.6600 164.00 94.00 70.00 206483 CGO 2005 06 01 00 28 00 415-99 D co CCGG 53.730 -999.990 ... R5 2005 10 11 11 09 00 -40.6600 144.6600 164.00 94.00 70.00 206484 CGO 2005 06 01 00 28 00 416-99 D co CCGG 56.340 -999.990 ..I R5 2005 10 11 11 23 00 -40.6600 144.6600 164.00 94.00 70.00 206485 CGO 2005 06 17 04 40 00 473-99 D co CCGG 59.440 -999.990 ... R5 2005 10 26 11 21 00 -40.6600 144.6600 164.00 94.00 70.00 207276 CGO 2005 06 17 04 40 00 474-99 D co CCGG 58.620 -999.990 ... R5 2005 10 26 11 36 00 -40.6600 144.6600 164.00 94.00 70.00 207277 CGO 2005 06 28 01 36 00 463-99 D co CCGG 61.340 -999.990 ... R5 2005 10 26 11 50 00 -40.6600 144.6600 164.00 94.00 70.00 207278 CGO 2005 06 28 01 36 00 464-99 D co CCGG 60.040 -999.990 ... R5 2005 10 26 12 04 00 -40.6600 144.6600 164.00 94.00 70.00 207279 CGO 2005 07 07 00 04 00 1591-99 D co CCGG 57.710 -999.990 ..I R5 2005 10 26 12 18 00 -40.6600 144.6600 164.00 94.00 70.00 207282 CGO 2005 07 07 00 04 00 1592-99 D co CCGG 57.430 -999.990 ... R5 2005 10 26 12 33 00 -40.6600 144.6600 164.00 94.00 70.00 207283 CGO 2005 07 11 02 58 00 3499-99 D co CCGG 59.990 -999.990 ... R5 2005 10 26 12 47 00 -40.6600 144.6600 164.00 94.00 70.00 207280 CGO 2005 07 11 02 58 00 3500-99 D co CCGG 60.850 -999.990 ..I R5 2005 10 26 13 01 00 -40.6600 144.6600 164.00 94.00 70.00 207281 CGO 2005 07 18 01 25 00 3117-99 D co CCGG 64.010 -999.990 P.I R5 2005 10 11 10 40 00 -40.6600 144.6600 164.00 94.00 70.00 206486 CGO 2005 07 18 01 25 00 3118-99 D co CCGG 59.020 -999.990 P.. R5 2005 10 11 10 54 00 -40.6600 144.6600 164.00 94.00 70.00 206487 CGO 2005 07 26 05 43 00 2809-99 D co CCGG 60.360 -999.990 ... R5 2005 10 11 09 43 00 -40.6600 144.6600 164.00 94.00 70.00 206480 CGO 2005 07 26 05 43 00 2810-99 D co CCGG 64.650 -999.990 ..I R5 2005 10 11 09 57 00 -40.6600 144.6600 164.00 94.00 70.00 206481 CGO 2005 08 04 02 08 00 2717-99 D co CCGG 61.620 -999.990 ..I R5 2005 10 25 14 32 00 -40.6600 144.6600 164.00 94.00 70.00 207306 CGO 2005 08 04 02 08 00 2718-99 D co CCGG 60.430 -999.990 ... R5 2005 10 25 14 46 00 -40.6600 144.6600 164.00 94.00 70.00 207307 CGO 2005 08 09 23 52 00 4059-99 D co CCGG 60.310 -999.990 ... R5 2005 10 25 14 03 00 -40.6600 144.6600 164.00 94.00 70.00 207304 CGO 2005 08 09 23 52 00 4060-99 D co CCGG 61.950 -999.990 ..I R5 2005 10 25 14 17 00 -40.6600 144.6600 164.00 94.00 70.00 207305 CGO 2005 08 15 02 01 00 201-99 D co CCGG 62.740 -999.990 ... R5 2005 10 25 13 06 00 -40.6600 144.6600 164.00 94.00 70.00 207300 CGO 2005 08 15 02 01 00 202-99 D co CCGG 65.120 -999.990 ..I R5 2005 10 25 13 20 00 -40.6600 144.6600 164.00 94.00 70.00 207301 CGO 2005 08 22 02 17 00 845-99 D co CCGG 64.720 -999.990 ..I R5 2005 10 25 13 35 00 -40.6600 144.6600 164.00 94.00 70.00 207302 CGO 2005 08 22 02 17 00 846-99 D co CCGG 63.980 -999.990 ... R5 2005 10 25 13 49 00 -40.6600 144.6600 164.00 94.00 70.00 207303 CGO 2005 09 01 02 43 00 1193-99 D co CCGG 63.580 -999.990 ... R5 2005 11 22 11 33 00 -40.6600 144.6600 164.00 94.00 70.00 209069 CGO 2005 09 01 02 43 00 1194-99 D co CCGG 64.270 -999.990 ..I R5 2005 11 22 11 47 00 -40.6600 144.6600 164.00 94.00 70.00 209070 CGO 2005 09 12 04 33 00 127-99 D co CCGG 70.040 -999.990 ..I R5 2005 11 22 11 04 00 -40.6600 144.6600 164.00 94.00 70.00 209071 CGO 2005 09 12 04 33 00 128-99 D co CCGG 67.300 -999.990 ... R5 2005 11 22 11 19 00 -40.6600 144.6600 164.00 94.00 70.00 209072 CGO 2005 09 27 01 36 00 2595-99 D co CCGG 69.620 -999.990 ... R5 2005 11 18 15 39 00 -40.6600 144.6600 164.00 94.00 70.00 208883 CGO 2005 09 27 01 36 00 2596-99 D co CCGG 70.160 -999.990 ..I R5 2005 11 18 15 53 00 -40.6600 144.6600 164.00 94.00 70.00 208884 CGO 2005 10 03 01 36 00 3139-99 D co CCGG 71.870 -999.990 ..I R5 2005 11 18 16 07 00 -40.6600 144.6600 164.00 94.00 70.00 208885 CGO 2005 10 03 01 36 00 3140-99 D co CCGG 70.420 -999.990 ... R5 2005 11 18 16 22 00 -40.6600 144.6600 164.00 94.00 70.00 208886 CGO 2005 10 10 23 26 00 2721-99 D co CCGG 66.840 -999.990 ... R5 2006 02 15 11 16 00 -40.6600 144.6600 164.00 94.00 70.00 212491 CGO 2005 10 10 23 26 00 2722-99 D co CCGG 73.220 -999.990 N.I R5 2006 02 15 11 30 00 -40.6600 144.6600 164.00 94.00 70.00 212492 CGO 2005 10 26 23 06 00 1901-99 D co CCGG 76.280 -999.990 N.I R5 2006 02 15 11 44 00 -40.6600 144.6600 164.00 94.00 70.00 212493 CGO 2005 10 26 23 06 00 1902-99 D co CCGG 70.730 -999.990 ... R5 2006 02 15 11 59 00 -40.6600 144.6600 164.00 94.00 70.00 212494 CGO 2005 11 04 01 05 00 4373-99 D co CCGG 69.230 -999.990 ... R5 2006 02 13 14 33 00 -40.6600 144.6600 164.00 94.00 70.00 212441 CGO 2005 11 04 01 05 00 4374-99 D co CCGG 73.390 -999.990 N.I R5 2006 02 13 14 47 00 -40.6600 144.6600 164.00 94.00 70.00 212442 CGO 2005 11 10 23 20 00 4375-99 D co CCGG 70.470 -999.990 N.I R5 2006 02 13 15 01 00 -40.6600 144.6600 164.00 94.00 70.00 212443 CGO 2005 11 10 23 20 00 4376-99 D co CCGG 65.970 -999.990 ... R5 2006 02 13 15 16 00 -40.6600 144.6600 164.00 94.00 70.00 212444 CGO 2005 12 08 00 48 00 665-99 D co CCGG 58.740 -999.990 ..I R5 2006 05 12 14 10 00 -40.6600 144.6600 164.00 94.00 70.00 216353 CGO 2005 12 08 00 48 00 666-99 D co CCGG 58.000 -999.990 ... R5 2006 05 12 14 24 00 -40.6600 144.6600 164.00 94.00 70.00 216354 CGO 2005 12 13 04 23 00 855-99 D co CCGG 54.080 -999.990 ... R5 2006 05 12 14 38 00 -40.6600 144.6600 164.00 94.00 70.00 216355 CGO 2005 12 13 04 23 00 856-99 D co CCGG 54.000 -999.990 ... R5 2006 05 12 14 52 00 -40.6600 144.6600 164.00 94.00 70.00 216356 CGO 2005 12 19 04 33 00 1759-99 D co CCGG 52.620 -999.990 ... R5 2006 05 10 13 14 00 -40.6600 144.6600 164.00 94.00 70.00 216296 CGO 2005 12 19 04 33 00 1760-99 D co CCGG 56.130 -999.990 N.I R5 2006 05 10 13 28 00 -40.6600 144.6600 164.00 94.00 70.00 216297 CGO 2005 12 28 00 42 00 2733-99 D co CCGG 50.770 -999.990 ..I R5 2006 05 10 12 45 00 -40.6600 144.6600 164.00 94.00 70.00 216294 CGO 2005 12 28 00 42 00 2734-99 D co CCGG 49.540 -999.990 ... R5 2006 05 10 12 59 00 -40.6600 144.6600 164.00 94.00 70.00 216295 CGO 2006 01 03 00 37 00 603-99 D co CCGG 48.410 -999.990 ... R5 2006 05 12 09 53 00 -40.6600 144.6600 164.00 94.00 70.00 216351 CGO 2006 01 03 00 37 00 604-99 D co CCGG 63.270 -999.990 N.I R5 2006 05 12 10 08 00 -40.6600 144.6600 164.00 94.00 70.00 216352 CGO 2006 01 23 02 55 00 3403-99 D co CCGG 49.560 -999.990 N.I R5 2006 05 12 09 25 00 -40.6600 144.6600 164.00 94.00 70.00 216349 CGO 2006 01 23 02 55 00 3404-99 D co CCGG 46.060 -999.990 ... R5 2006 05 12 09 39 00 -40.6600 144.6600 164.00 94.00 70.00 216350 CGO 2006 02 02 00 44 00 4383-99 D co CCGG 43.160 -999.990 ... R5 2006 06 14 13 51 00 -40.6600 144.6600 164.00 94.00 70.00 217589 CGO 2006 02 09 23 18 00 4385-99 D co CCGG 42.430 -999.990 ... R5 2006 06 12 09 16 00 -40.6600 144.6600 164.00 94.00 70.00 217590 CGO 2006 02 09 23 18 00 4386-99 D co CCGG 42.790 -999.990 ... R5 2006 06 12 09 30 00 -40.6600 144.6600 164.00 94.00 70.00 217591 CGO 2006 02 20 23 19 00 3765-99 D co CCGG 44.310 -999.990 ... R5 2006 05 04 09 10 00 -40.6600 144.6600 164.00 94.00 70.00 216344 CGO 2006 02 20 23 19 00 3766-99 D co CCGG 45.220 -999.990 ..I R5 2006 05 04 09 24 00 -40.6600 144.6600 164.00 94.00 70.00 216345 CGO 2006 02 27 03 30 00 6263-66 D co CCGG 43.640 -999.990 ... R5 2006 05 04 09 39 00 -40.6600 144.6600 164.00 94.00 70.00 216342 CGO 2006 02 27 03 30 00 6264-66 D co CCGG 42.350 -999.990 ... R5 2006 05 04 09 53 00 -40.6600 144.6600 164.00 94.00 70.00 216343 CGO 2006 03 06 01 16 00 4389-99 D co CCGG 42.430 -999.990 ..I R5 2006 05 12 08 57 00 -40.6600 144.6600 164.00 94.00 70.00 216346 CGO 2006 03 06 01 16 00 4390-99 D co CCGG 41.930 -999.990 ... R5 2006 05 12 09 11 00 -40.6600 144.6600 164.00 94.00 70.00 216347 CGO 2006 03 16 23 13 00 3577-99 D co CCGG 43.140 -999.990 ..I R5 2006 06 27 12 48 00 -40.6600 144.6600 164.00 94.00 70.00 218234 CGO 2006 03 16 23 13 00 3578-99 D co CCGG 42.320 -999.990 ... R5 2006 06 27 13 03 00 -40.6600 144.6600 164.00 94.00 70.00 218235 CGO 2006 03 17 02 18 00 4387-99 D co CCGG 42.040 -999.990 ... R5 2006 05 17 13 52 00 -40.6600 144.6600 164.00 94.00 70.00 216348 CGO 2006 03 30 23 20 00 3609-99 D co CCGG 45.260 -999.990 ... R5 2006 06 27 13 17 00 -40.6600 144.6600 164.00 94.00 70.00 218232 CGO 2006 03 30 23 20 00 3610-99 D co CCGG 45.970 -999.990 ..I R5 2006 06 27 13 31 00 -40.6600 144.6600 164.00 94.00 70.00 218233 CGO 2006 04 07 00 57 00 3071-99 D co CCGG 45.340 -999.990 ..I R5 2006 07 19 13 53 00 -40.6600 144.6600 164.00 94.00 70.00 219183 CGO 2006 04 07 00 57 00 3072-99 D co CCGG 43.990 -999.990 ... R5 2006 07 19 14 07 00 -40.6600 144.6600 164.00 94.00 70.00 219184 CGO 2006 04 12 00 19 00 1707-99 D co CCGG 44.800 -999.990 ... R5 2006 07 19 13 24 00 -40.6600 144.6600 164.00 94.00 70.00 219181 CGO 2006 04 12 00 19 00 1708-99 D co CCGG 46.020 -999.990 ..I R5 2006 07 19 13 38 00 -40.6600 144.6600 164.00 94.00 70.00 219182 CGO 2006 04 20 03 59 00 4381-99 D co CCGG 45.050 -999.990 ..I R5 2006 07 19 14 21 00 -40.6600 144.6600 164.00 94.00 70.00 219187 CGO 2006 04 20 03 59 00 4382-99 D co CCGG 44.820 -999.990 ... R5 2006 07 19 14 35 00 -40.6600 144.6600 164.00 94.00 70.00 219188 CGO 2006 05 03 02 56 00 4391-99 D co CCGG 46.230 -999.990 ... R5 2006 07 19 14 49 00 -40.6600 144.6600 164.00 94.00 70.00 219185 CGO 2006 05 03 02 56 00 4392-99 D co CCGG 46.770 -999.990 ..I R5 2006 07 19 15 04 00 -40.6600 144.6600 164.00 94.00 70.00 219186 CGO 2006 05 10 04 47 00 3353-99 D co CCGG 47.390 -999.990 ..I R5 2006 08 03 14 29 00 -40.6600 144.6600 164.00 94.00 70.00 220093 CGO 2006 05 10 04 47 00 3354-99 D co CCGG 46.640 -999.990 ... R5 2006 08 03 14 43 00 -40.6600 144.6600 164.00 94.00 70.00 220094 CGO 2006 05 17 02 59 00 3371-99 D co CCGG 51.070 -999.990 ... R5 2006 08 03 14 00 00 -40.6600 144.6600 164.00 94.00 70.00 220091 CGO 2006 05 17 02 59 00 3372-99 D co CCGG 52.310 -999.990 ..I R5 2006 08 03 14 15 00 -40.6600 144.6600 164.00 94.00 70.00 220092 CGO 2006 06 12 00 36 00 2871-99 D co CCGG 51.040 -999.990 ..I R5 2006 08 11 12 05 00 -40.6600 144.6600 164.00 94.00 70.00 220242 CGO 2006 06 12 00 36 00 2872-99 D co CCGG 50.620 -999.990 ... R5 2006 08 11 12 19 00 -40.6600 144.6600 164.00 94.00 70.00 220243 CGO 2006 06 23 07 40 00 3137-99 D co CCGG 53.210 -999.990 ... R5 2006 08 11 11 36 00 -40.6600 144.6600 164.00 94.00 70.00 220240 CGO 2006 06 23 07 40 00 3138-99 D co CCGG 53.020 -999.990 ..I R5 2006 08 11 11 51 00 -40.6600 144.6600 164.00 94.00 70.00 220241 CGO 2006 06 27 01 50 00 125-99 D co CCGG 51.840 -999.990 ... R5 2006 10 02 12 18 00 -40.6600 144.6600 164.00 94.00 70.00 222714 CGO 2006 06 27 01 50 00 126-99 D co CCGG 52.750 -999.990 ..I R5 2006 10 02 12 32 00 -40.6600 144.6600 164.00 94.00 70.00 222715 CGO 2006 07 06 01 13 00 953-99 D co CCGG 53.580 -999.990 ... R5 2006 10 02 12 47 00 -40.6600 144.6600 164.00 94.00 70.00 222712 CGO 2006 07 06 01 13 00 954-99 D co CCGG 54.240 -999.990 ..I R5 2006 10 02 13 01 00 -40.6600 144.6600 164.00 94.00 70.00 222713 CGO 2006 07 12 02 00 00 957-99 D co CCGG 53.760 -999.990 ... R5 2006 10 03 12 38 00 -40.6600 144.6600 164.00 94.00 70.00 222777 CGO 2006 07 12 02 00 00 958-99 D co CCGG 54.780 -999.990 ..I R5 2006 10 03 12 52 00 -40.6600 144.6600 164.00 94.00 70.00 222778 CGO 2006 07 31 00 19 00 3103-99 D co CCGG 58.510 -999.990 ..I R5 2006 10 03 12 10 00 -40.6600 144.6600 164.00 94.00 70.00 222779 CGO 2006 07 31 00 19 00 3104-99 D co CCGG 57.480 -999.990 ... R5 2006 10 03 12 24 00 -40.6600 144.6600 164.00 94.00 70.00 222780 CGO 2006 08 09 02 25 00 1417-99 D co CCGG 60.660 -999.990 ..I R5 2006 10 25 12 56 00 -40.6600 144.6600 164.00 94.00 70.00 223826 CGO 2006 08 09 02 25 00 1418-99 D co CCGG 56.940 -999.990 ... R5 2006 10 25 13 10 00 -40.6600 144.6600 164.00 94.00 70.00 223827 CGO 2006 08 17 00 12 00 2809-99 D co CCGG 57.790 -999.990 ... R5 2006 10 25 12 28 00 -40.6600 144.6600 164.00 94.00 70.00 223824 CGO 2006 08 17 00 12 00 2810-99 D co CCGG 58.480 -999.990 ..I R5 2006 10 25 12 42 00 -40.6600 144.6600 164.00 94.00 70.00 223825 CGO 2006 08 22 02 28 00 6527-66 D co CCGG 60.490 -999.990 ... R5 2006 10 27 11 37 00 -40.6600 144.6600 164.00 94.00 70.00 223898 CGO 2006 08 22 02 28 00 6528-66 D co CCGG 61.140 -999.990 ... R5 2006 10 27 11 51 00 -40.6600 144.6600 164.00 94.00 70.00 223899 CGO 2006 08 28 01 38 00 1135-99 D co CCGG 66.360 -999.990 N.I R5 2006 10 27 12 05 00 -40.6600 144.6600 164.00 94.00 70.00 223896 CGO 2006 08 28 01 38 00 1136-99 D co CCGG 61.950 -999.990 ... R5 2006 10 27 12 20 00 -40.6600 144.6600 164.00 94.00 70.00 223897 CGO 2006 09 04 01 58 00 2689-99 D co CCGG 63.810 -999.990 N.I R5 2007 01 25 13 24 00 -40.6600 144.6600 164.00 94.00 70.00 227065 CGO 2006 09 04 01 58 00 2690-99 D co CCGG 59.570 -999.990 ... R5 2007 01 25 13 38 00 -40.6600 144.6600 164.00 94.00 70.00 227066 CGO 2006 09 15 01 00 00 4087-99 D co CCGG 66.080 -999.990 ... R5 2007 01 25 12 55 00 -40.6600 144.6600 164.00 94.00 70.00 227067 CGO 2006 09 15 01 00 00 4088-99 D co CCGG 66.180 -999.990 ..I R5 2007 01 25 13 09 00 -40.6600 144.6600 164.00 94.00 70.00 227068 CGO 2006 09 20 01 12 00 3383-99 D co CCGG 64.100 -999.990 ..I R5 2007 01 17 14 26 00 -40.6600 144.6600 164.00 94.00 70.00 227041 CGO 2006 09 20 01 12 00 3384-99 D co CCGG 63.490 -999.990 ... R5 2007 01 17 14 40 00 -40.6600 144.6600 164.00 94.00 70.00 227042 CGO 2006 09 25 02 29 00 1375-99 D co CCGG 61.720 -999.990 ... R5 2007 01 17 14 54 00 -40.6600 144.6600 164.00 94.00 70.00 227043 CGO 2006 09 25 02 29 00 1376-99 D co CCGG 61.960 -999.990 ..I R5 2007 01 17 15 08 00 -40.6600 144.6600 164.00 94.00 70.00 227044 CGO 2006 10 02 01 38 00 2851-99 D co CCGG 63.090 -999.990 ... R5 2007 01 25 15 19 00 -40.6600 144.6600 164.00 94.00 70.00 227069 CGO 2006 10 02 01 38 00 2852-99 D co CCGG 62.940 -999.990 ..I R5 2007 01 25 15 34 00 -40.6600 144.6600 164.00 94.00 70.00 227070 CGO 2006 10 09 01 52 00 4197-99 D co CCGG 63.440 -999.990 ..I R5 2007 01 25 13 52 00 -40.6600 144.6600 164.00 94.00 70.00 227071 CGO 2006 10 09 01 52 00 4198-99 D co CCGG 63.000 -999.990 ... R5 2007 01 25 14 06 00 -40.6600 144.6600 164.00 94.00 70.00 227072 CGO 2006 10 18 22 34 00 3963-99 D co CCGG 62.340 -999.990 ..I R5 2007 01 23 13 01 00 -40.6600 144.6600 164.00 94.00 70.00 227131 CGO 2006 10 18 22 34 00 3964-99 D co CCGG 61.860 -999.990 ... R5 2007 01 23 13 15 00 -40.6600 144.6600 164.00 94.00 70.00 227132 CGO 2006 10 26 00 21 00 1599-99 D co CCGG 59.810 -999.990 ... R5 2007 01 23 13 29 00 -40.6600 144.6600 164.00 94.00 70.00 227133 CGO 2006 10 26 00 21 00 1600-99 D co CCGG 59.860 -999.990 ..I R5 2007 01 23 13 43 00 -40.6600 144.6600 164.00 94.00 70.00 227134 CGO 2006 11 03 00 46 00 1031-99 D co CCGG 62.590 -999.990 ..I R5 2007 01 17 13 57 00 -40.6600 144.6600 164.00 94.00 70.00 227039 CGO 2006 11 03 00 46 00 1032-99 D co CCGG 62.670 -999.990 ... R5 2007 01 17 14 12 00 -40.6600 144.6600 164.00 94.00 70.00 227040 CGO 2006 11 07 01 57 00 3561-99 D co CCGG 59.180 -999.990 ... R5 2007 01 17 13 29 00 -40.6600 144.6600 164.00 94.00 70.00 227037 CGO 2006 11 07 01 57 00 3562-99 D co CCGG 59.550 -999.990 ..I R5 2007 01 17 13 43 00 -40.6600 144.6600 164.00 94.00 70.00 227038 CGO 2006 11 13 23 46 00 717-99 D co CCGG 58.620 -999.990 ... R5 2007 01 19 10 42 00 -40.6600 144.6600 164.00 94.00 70.00 227013 CGO 2006 11 13 23 46 00 718-99 D co CCGG 60.360 -999.990 ..I R5 2007 01 19 10 56 00 -40.6600 144.6600 164.00 94.00 70.00 227014 CGO 2006 11 22 00 26 00 3941-99 D co CCGG 65.840 -999.990 .XI R5 2007 01 19 11 10 00 -40.6600 144.6600 164.00 94.00 70.00 227015 CGO 2006 11 22 00 26 00 3942-99 D co CCGG 64.870 -999.990 .X. R5 2007 01 19 11 25 00 -40.6600 144.6600 164.00 94.00 70.00 227016 CGO 2006 11 27 23 22 00 3303-99 D co CCGG 60.330 -999.990 N.I R5 2007 04 19 11 51 00 -40.6600 144.6600 164.00 94.00 70.00 232605 CGO 2006 11 27 23 22 00 3304-99 D co CCGG 55.980 -999.990 ... R5 2007 04 19 12 05 00 -40.6600 144.6600 164.00 94.00 70.00 232606 CGO 2006 12 06 00 17 00 4163-99 D co CCGG 51.870 -999.990 ... R5 2007 04 19 12 19 00 -40.6600 144.6600 164.00 94.00 70.00 232607 CGO 2006 12 06 00 17 00 4164-99 D co CCGG 54.490 -999.990 ..I R5 2007 04 19 12 33 00 -40.6600 144.6600 164.00 94.00 70.00 232608 CGO 2006 12 11 01 05 00 1799-99 D co CCGG 51.430 -999.990 ... R5 2007 03 05 12 41 00 -40.6600 144.6600 164.00 94.00 70.00 230045 CGO 2006 12 11 01 05 00 1800-99 D co CCGG 53.260 -999.990 ..I R5 2007 03 05 12 55 00 -40.6600 144.6600 164.00 94.00 70.00 230046 CGO 2006 12 17 23 39 00 3947-99 D co CCGG 50.580 -999.990 ..I R5 2007 03 05 13 09 00 -40.6600 144.6600 164.00 94.00 70.00 230043 CGO 2006 12 17 23 39 00 3948-99 D co CCGG 48.730 -999.990 ... R5 2007 03 05 13 24 00 -40.6600 144.6600 164.00 94.00 70.00 230044 CGO 2007 01 08 00 30 00 2991-99 D co CCGG 48.160 -999.990 ..I R5 2007 04 24 10 49 00 -40.6600 144.6600 164.00 94.00 70.00 232741 CGO 2007 01 08 00 30 00 2992-99 D co CCGG 47.940 -999.990 ... R5 2007 04 24 11 03 00 -40.6600 144.6600 164.00 94.00 70.00 232742 CGO 2007 01 22 00 41 00 605-99 D co CCGG 47.270 -999.990 ... R5 2007 04 24 10 20 00 -40.6600 144.6600 164.00 94.00 70.00 232739 CGO 2007 01 22 00 41 00 606-99 D co CCGG 82.360 -999.990 N.I R5 2007 04 24 10 34 00 -40.6600 144.6600 164.00 94.00 70.00 232740 CGO 2007 01 30 02 29 00 3849-99 D co CCGG 46.550 -999.990 ... R5 2007 04 19 12 48 00 -40.6600 144.6600 164.00 94.00 70.00 232609 CGO 2007 01 30 02 29 00 3850-99 D co CCGG 47.220 -999.990 ..I R5 2007 04 19 13 02 00 -40.6600 144.6600 164.00 94.00 70.00 232610 CGO 2007 02 07 02 28 00 2167-99 D co CCGG 45.700 -999.990 ..I R5 2007 04 19 13 16 00 -40.6600 144.6600 164.00 94.00 70.00 232620 CGO 2007 02 07 02 28 00 2168-99 D co CCGG 46.200 -999.990 ... R5 2007 04 19 13 30 00 -40.6600 144.6600 164.00 94.00 70.00 232621 CGO 2007 03 05 01 48 00 2451-99 D co CCGG 44.300 -999.990 ... R5 2007 05 04 13 18 00 -40.6600 144.6600 164.00 94.00 70.00 233457 CGO 2007 03 05 01 48 00 2452-99 D co CCGG 44.770 -999.990 ..I R5 2007 05 04 13 32 00 -40.6600 144.6600 164.00 94.00 70.00 233458 CGO 2007 03 15 23 14 00 3755-99 D co CCGG 53.400 -999.990 .XI R5 2007 05 04 12 49 00 -40.6600 144.6600 164.00 94.00 70.00 233459 CGO 2007 03 15 23 14 00 3756-99 D co CCGG 53.410 -999.990 .X. R5 2007 05 04 13 03 00 -40.6600 144.6600 164.00 94.00 70.00 233460 CGO 2007 03 30 02 09 00 3195-99 D co CCGG 50.330 -999.990 ... R5 2007 10 12 13 57 00 -40.6600 144.6600 164.00 94.00 70.00 243063 CGO 2007 03 30 02 09 00 3196-99 D co CCGG 49.080 -999.990 ..I R5 2007 10 12 14 11 00 -40.6600 144.6600 164.00 94.00 70.00 243064 CGO 2007 05 08 00 15 00 3463-99 D co CCGG 50.530 -999.990 ..I R5 2007 10 12 13 28 00 -40.6600 144.6600 164.00 94.00 70.00 243065 CGO 2007 05 08 00 15 00 3464-99 D co CCGG 49.500 -999.990 ... R5 2007 10 12 13 42 00 -40.6600 144.6600 164.00 94.00 70.00 243066 CGO 2007 05 21 04 09 00 6565-66 D co CCGG 50.860 -999.990 ... R5 2007 10 24 10 16 00 -40.6600 144.6600 164.00 94.00 70.00 243706 CGO 2007 05 21 04 09 00 6566-66 D co CCGG 51.440 -999.990 ..I R5 2007 10 24 10 31 00 -40.6600 144.6600 164.00 94.00 70.00 243707 CGO 2007 05 30 00 22 00 481-99 D co CCGG 53.000 -999.990 ..I R5 2007 10 24 10 45 00 -40.6600 144.6600 164.00 94.00 70.00 243708 CGO 2007 05 30 00 22 00 482-99 D co CCGG 52.170 -999.990 ... R5 2007 10 24 10 59 00 -40.6600 144.6600 164.00 94.00 70.00 243709 CGO 2007 06 12 01 42 00 3245-99 D co CCGG 57.060 -999.990 ..I R5 2007 11 08 15 05 00 -40.6600 144.6600 164.00 94.00 70.00 244652 CGO 2007 06 12 01 42 00 3246-99 D co CCGG 54.820 -999.990 ... R5 2007 11 08 15 19 00 -40.6600 144.6600 164.00 94.00 70.00 244653 CGO 2007 06 20 01 33 00 321-99 D co CCGG 56.450 -999.990 ... R5 2007 11 09 11 00 00 -40.6600 144.6600 164.00 94.00 70.00 244650 CGO 2007 06 20 01 33 00 322-99 D co CCGG 56.550 -999.990 ..I R5 2007 11 09 11 14 00 -40.6600 144.6600 164.00 94.00 70.00 244651 CGO 2007 06 29 00 50 00 4489-99 D co CCGG 62.120 -999.990 ... R5 2007 10 24 12 11 00 -40.6600 144.6600 164.00 94.00 70.00 243710 CGO 2007 06 29 00 50 00 4490-99 D co CCGG 62.480 -999.990 ..I R5 2007 10 24 12 26 00 -40.6600 144.6600 164.00 94.00 70.00 243711 CGO 2007 07 13 00 58 00 6761-66 D co CCGG 58.970 -999.990 ..I R5 2007 10 24 09 48 00 -40.6600 144.6600 164.00 94.00 70.00 243712 CGO 2007 07 13 00 58 00 6762-66 D co CCGG 57.810 -999.990 ... R5 2007 10 24 10 02 00 -40.6600 144.6600 164.00 94.00 70.00 243713 CGO 2007 07 17 01 45 00 413-99 D co CCGG 58.320 -999.990 ... R5 2007 10 12 12 59 00 -40.6600 144.6600 164.00 94.00 70.00 243059 CGO 2007 07 17 01 45 00 414-99 D co CCGG 69.590 -999.990 N.I R5 2007 10 12 13 14 00 -40.6600 144.6600 164.00 94.00 70.00 243060 CGO 2007 07 27 04 42 00 415-99 D co CCGG 60.620 -999.990 ..I R5 2007 10 12 12 31 00 -40.6600 144.6600 164.00 94.00 70.00 243061 CGO 2007 07 27 04 42 00 416-99 D co CCGG 59.280 -999.990 ... R5 2007 10 12 12 45 00 -40.6600 144.6600 164.00 94.00 70.00 243062 CGO 2007 08 03 01 13 00 2659-99 D co CCGG 60.350 -999.990 ... R5 2007 11 08 14 36 00 -40.6600 144.6600 164.00 94.00 70.00 244647 CGO 2007 08 03 01 13 00 2660-99 D co CCGG 60.970 -999.990 ..I R5 2007 11 08 14 51 00 -40.6600 144.6600 164.00 94.00 70.00 244648 CGO 2007 08 17 03 59 00 2571-99 D co CCGG 62.760 -999.990 ..I R5 2007 11 15 13 34 00 -40.6600 144.6600 164.00 94.00 70.00 244649 CGO 2007 08 28 01 38 00 4365-99 D co CCGG 64.920 -999.990 ... V2 2008 01 31 15 35 00 -40.6700 144.6700 164.00 94.00 70.00 248738 CGO 2007 08 28 01 38 00 4366-99 D co CCGG 69.550 -999.990 N.I V2 2008 01 31 15 51 00 -40.6700 144.6700 164.00 94.00 70.00 248739 CGO 2007 09 03 01 49 00 4001-99 D co CCGG 71.520 -999.990 N.I V2 2008 01 31 16 06 00 -40.6700 144.6700 164.00 94.00 70.00 248740 CGO 2007 09 03 01 49 00 4002-99 D co CCGG 64.180 -999.990 ... V2 2008 01 31 16 21 00 -40.6700 144.6700 164.00 94.00 70.00 248741 CGO 2007 09 14 05 09 00 2481-99 D co CCGG 67.910 -999.990 ..I R5 2008 03 31 13 59 00 -40.6700 144.6700 164.00 94.00 70.00 251586 CGO 2007 09 14 05 09 00 2482-99 D co CCGG 66.930 -999.990 ... R5 2008 03 31 14 13 00 -40.6700 144.6700 164.00 94.00 70.00 251587 CGO 2007 09 20 00 32 00 177-99 D co CCGG 64.710 -999.990 ... R5 2008 03 31 13 31 00 -40.6700 144.6700 164.00 94.00 70.00 251588 CGO 2007 09 20 00 32 00 178-99 D co CCGG 65.780 -999.990 ..I R5 2008 03 31 13 45 00 -40.6700 144.6700 164.00 94.00 70.00 251589 CGO 2007 10 01 03 50 00 4631-99 D co CCGG 65.380 -999.990 ... R5 2008 03 31 11 37 00 -40.6700 144.6700 164.00 94.00 70.00 251562 CGO 2007 10 01 03 50 00 4632-99 D co CCGG 65.580 -999.990 ..I R5 2008 03 31 11 51 00 -40.6700 144.6700 164.00 94.00 70.00 251563 CGO 2007 10 15 22 52 00 103-99 D co CCGG 66.770 -999.990 ..I R5 2008 03 31 12 05 00 -40.6700 144.6700 164.00 94.00 70.00 251564 CGO 2007 10 15 22 52 00 104-99 D co CCGG 67.510 -999.990 ... R5 2008 03 31 12 19 00 -40.6700 144.6700 164.00 94.00 70.00 251565 CGO 2007 10 22 00 15 00 3759-99 D co CCGG 74.220 -999.990 .X. V2 2008 01 31 14 34 00 -40.6700 144.6700 164.00 94.00 70.00 248734 CGO 2007 10 22 00 15 00 3760-99 D co CCGG 75.560 -999.990 .XI V2 2008 01 31 14 49 00 -40.6700 144.6700 164.00 94.00 70.00 248735 CGO 2007 10 30 03 03 00 4251-99 D co CCGG 70.540 -999.990 ..I V2 2008 01 31 15 05 00 -40.6700 144.6700 164.00 94.00 70.00 248736 CGO 2007 10 30 03 03 00 4252-99 D co CCGG 69.010 -999.990 ... V2 2008 01 31 15 20 00 -40.6700 144.6700 164.00 94.00 70.00 248737 CGO 2007 11 11 23 57 00 2903-99 D co CCGG 66.820 -999.990 ... V2 2008 02 01 09 21 00 -40.6700 144.6700 164.00 94.00 70.00 248742 CGO 2007 11 11 23 57 00 2904-99 D co CCGG 68.440 -999.990 ..I V2 2008 02 01 09 37 00 -40.6700 144.6700 164.00 94.00 70.00 248743 CGO 2007 11 21 22 41 00 2241-99 D co CCGG 69.940 -999.990 N.I V2 2008 02 01 09 52 00 -40.6700 144.6700 164.00 94.00 70.00 248744 CGO 2007 11 21 22 41 00 2242-99 D co CCGG 66.500 -999.990 ... V2 2008 02 01 10 08 00 -40.6700 144.6700 164.00 94.00 70.00 248745 CGO 2007 12 04 01 38 00 1253-99 D co CCGG 66.980 -999.990 .X. V2 2008 02 01 11 55 00 -40.6700 144.6700 164.00 94.00 70.00 248747 CGO 2007 12 04 01 38 00 1254-99 D co CCGG 68.030 -999.990 .X. V2 2008 02 01 12 10 00 -40.6700 144.6700 164.00 94.00 70.00 248748 CGO 2007 12 10 01 03 00 4268-99 D co CCGG 56.120 -999.990 ... R5 2008 02 04 13 49 00 -40.6700 144.6700 164.00 94.00 70.00 248746 CGO 2007 12 24 00 29 00 3315-99 D co CCGG 51.570 -999.990 ... R5 2008 03 31 12 34 00 -40.6700 144.6700 164.00 94.00 70.00 251584 CGO 2007 12 24 00 29 00 3316-99 D co CCGG 51.860 -999.990 ..I R5 2008 03 31 12 48 00 -40.6700 144.6700 164.00 94.00 70.00 251585 CGO 2008 01 08 00 25 00 2343-99 D co CCGG 48.000 -999.990 ..I R5 2008 03 31 13 02 00 -40.6700 144.6700 164.00 94.00 70.00 251582 CGO 2008 01 08 00 25 00 2344-99 D co CCGG 48.190 -999.990 ... R5 2008 03 31 13 16 00 -40.6700 144.6700 164.00 94.00 70.00 251583 CGO 2008 01 14 01 23 00 1599-99 D co CCGG 45.610 -999.990 ... R5 2008 04 10 14 56 00 -40.6700 144.6700 164.00 94.00 70.00 252124 CGO 2008 01 14 01 23 00 1600-99 D co CCGG 47.360 -999.990 ..I R5 2008 04 10 15 10 00 -40.6700 144.6700 164.00 94.00 70.00 252125 CGO 2008 01 30 23 32 00 133-99 D co CCGG 48.160 -999.990 N.I R5 2008 04 10 14 27 00 -40.6700 144.6700 164.00 94.00 70.00 252126 CGO 2008 01 30 23 32 00 134-99 D co CCGG 42.670 -999.990 ... R5 2008 04 10 14 41 00 -40.6700 144.6700 164.00 94.00 70.00 252127 CGO 2008 02 07 01 24 00 1593-99 D co CCGG 42.590 -999.990 ... R5 2008 04 11 11 05 00 -40.6700 144.6700 164.00 94.00 70.00 252128 CGO 2008 02 07 01 24 00 1594-99 D co CCGG 42.650 -999.990 ..I R5 2008 04 11 11 19 00 -40.6700 144.6700 164.00 94.00 70.00 252129 CGO 2008 02 11 22 52 00 2217-99 D co CCGG 42.790 -999.990 ..I R5 2008 04 11 11 33 00 -40.6700 144.6700 164.00 94.00 70.00 252130 CGO 2008 02 11 22 52 00 2218-99 D co CCGG 42.340 -999.990 ... R5 2008 04 11 11 48 00 -40.6700 144.6700 164.00 94.00 70.00 252131 CGO 2008 02 19 23 25 00 2941-99 D co CCGG 42.200 -999.990 ..I R5 2008 04 29 13 05 00 -40.6700 144.6700 164.00 94.00 70.00 253162 CGO 2008 02 19 23 25 00 2942-99 D co CCGG 40.590 -999.990 ... R5 2008 04 29 13 20 00 -40.6700 144.6700 164.00 94.00 70.00 253163 CGO 2008 02 25 01 10 00 2739-99 D co CCGG 42.800 -999.990 ... R5 2008 04 29 12 08 00 -40.6700 144.6700 164.00 94.00 70.00 253164 CGO 2008 02 25 01 10 00 2740-99 D co CCGG 44.700 -999.990 ..I R5 2008 04 29 12 23 00 -40.6700 144.6700 164.00 94.00 70.00 253165 CGO 2008 03 18 00 25 00 2689-99 D co CCGG 51.090 -999.990 ... R5 2008 04 29 12 37 00 -40.6700 144.6700 164.00 94.00 70.00 253160 CGO 2008 03 18 00 25 00 2690-99 D co CCGG 50.940 -999.990 ..I R5 2008 04 29 12 51 00 -40.6700 144.6700 164.00 94.00 70.00 253161 CGO 2008 03 26 01 47 00 846-99 D co CCGG 41.850 -999.990 ... R5 2008 04 30 12 12 00 -40.6700 144.6700 164.00 94.00 70.00 253159 CGO 2008 03 30 23 30 00 3985-99 D co CCGG 44.010 -999.990 ..I V2 2008 08 29 12 14 00 -40.6800 144.6800 164.00 94.00 70.00 259675 CGO 2008 03 30 23 30 00 3986-99 D co CCGG 43.160 -999.990 ... V2 2008 08 29 12 29 00 -40.6800 144.6800 164.00 94.00 70.00 259676 CGO 2008 04 16 01 47 00 1839-99 D co CCGG 49.120 -999.990 ... V2 2008 08 29 11 12 00 -40.6800 144.6800 164.00 94.00 70.00 259677 CGO 2008 04 16 01 47 00 1840-99 D co CCGG 50.820 -999.990 ..I V2 2008 08 29 11 28 00 -40.6800 144.6800 164.00 94.00 70.00 259678 CGO 2008 04 28 06 09 00 4779-99 D co CCGG 46.380 -999.990 ... V2 2008 09 05 14 26 00 -40.6800 144.6800 164.00 94.00 70.00 260295 CGO 2008 04 28 06 09 00 4780-99 D co CCGG 48.090 -999.990 ..I V2 2008 09 05 14 41 00 -40.6800 144.6800 164.00 94.00 70.00 260296 CGO 2008 05 07 02 09 00 1477-99 D co CCGG 54.650 -999.990 ..I V2 2008 09 05 13 55 00 -40.6800 144.6800 164.00 94.00 70.00 260297 CGO 2008 05 07 02 09 00 1478-99 D co CCGG 51.340 -999.990 ... V2 2008 09 05 14 10 00 -40.6800 144.6800 164.00 94.00 70.00 260298 CGO 2008 05 19 03 39 00 481-99 D co CCGG 53.260 -999.990 ... V2 2008 08 29 11 43 00 -40.6800 144.6800 164.00 94.00 70.00 259679 CGO 2008 05 19 03 39 00 482-99 D co CCGG 61.030 -999.990 N.I V2 2008 08 29 11 58 00 -40.6800 144.6800 164.00 94.00 70.00 259680 CGO 2008 06 12 23 53 00 101-99 D co CCGG 55.200 -999.990 ..I V2 2008 08 29 12 45 00 -40.6800 144.6800 164.00 94.00 70.00 259681 CGO 2008 06 12 23 53 00 102-99 D co CCGG 52.790 -999.990 ... V2 2008 08 29 13 00 00 -40.6800 144.6800 164.00 94.00 70.00 259682 CGO 2008 06 19 00 57 00 189-99 D co CCGG 55.590 -999.990 ..I V2 2008 09 09 15 11 00 -40.6800 144.6800 164.00 94.00 70.00 260391 CGO 2008 06 19 00 57 00 190-99 D co CCGG 54.820 -999.990 ... V2 2008 09 09 15 26 00 -40.6800 144.6800 164.00 94.00 70.00 260392 CGO 2008 06 21 02 06 00 2761-99 D co CCGG 54.810 -999.990 ... V2 2008 09 09 15 42 00 -40.6800 144.6800 164.00 94.00 70.00 260389 CGO 2008 06 21 02 06 00 2762-99 D co CCGG 57.530 -999.990 ..I V2 2008 09 09 15 57 00 -40.6800 144.6800 164.00 94.00 70.00 260390 CGO 2008 07 02 01 05 00 2095-99 D co CCGG 67.420 -999.990 N.I V2 2008 08 28 12 32 00 -40.6800 144.6800 164.00 94.00 70.00 259697 CGO 2008 07 02 01 05 00 2096-99 D co CCGG 57.900 -999.990 ... V2 2008 08 28 12 48 00 -40.6800 144.6800 164.00 94.00 70.00 259698 CGO 2008 07 11 00 38 00 1583-99 D co CCGG 57.730 -999.990 ... V2 2008 08 28 13 03 00 -40.6800 144.6800 164.00 94.00 70.00 259695 CGO 2008 07 11 00 38 00 1584-99 D co CCGG 60.210 -999.990 ..I V2 2008 08 28 13 18 00 -40.6800 144.6800 164.00 94.00 70.00 259696 CGO 2008 07 18 00 17 00 6043-66 D co CCGG 58.460 -999.990 ..I V2 2008 09 05 14 57 00 -40.6800 144.6800 164.00 94.00 70.00 260299 CGO 2008 07 18 00 17 00 6044-66 D co CCGG 58.370 -999.990 ... V2 2008 09 05 15 12 00 -40.6800 144.6800 164.00 94.00 70.00 260300 CGO 2008 07 22 01 30 00 159-99 D co CCGG 57.730 -999.990 ... V2 2008 09 05 15 27 00 -40.6800 144.6800 164.00 94.00 70.00 260301 CGO 2008 07 22 01 30 00 160-99 D co CCGG 57.950 -999.990 ..I V2 2008 09 05 15 43 00 -40.6800 144.6800 164.00 94.00 70.00 260302 CGO 2008 08 01 03 58 00 1917-99 D co CCGG 60.670 -999.990 ..I R5 2008 09 25 14 50 00 -40.6800 144.6800 164.00 94.00 70.00 261463 CGO 2008 08 01 03 58 00 1918-99 D co CCGG 59.980 -999.990 ... R5 2008 09 25 15 04 00 -40.6800 144.6800 164.00 94.00 70.00 261464 CGO 2008 08 11 00 38 00 1443-99 D co CCGG 60.740 -999.990 ..I R5 2008 09 25 14 21 00 -40.6800 144.6800 164.00 94.00 70.00 261477 CGO 2008 08 11 00 38 00 1444-99 D co CCGG 59.230 -999.990 ... R5 2008 09 25 14 36 00 -40.6800 144.6800 164.00 94.00 70.00 261478 CGO 2008 08 21 01 12 00 4329-99 D co CCGG 61.030 -999.990 ..I R5 2008 10 23 15 51 00 -40.6800 144.6800 164.00 94.00 70.00 262635 CGO 2008 08 21 01 12 00 4330-99 D co CCGG 59.260 -999.990 ... R5 2008 10 23 16 05 00 -40.6800 144.6800 164.00 94.00 70.00 262636 CGO 2008 08 27 02 09 00 1013-99 D co CCGG 62.050 -999.990 ..I R5 2008 10 23 15 22 00 -40.6800 144.6800 164.00 94.00 70.00 262637 CGO 2008 08 27 02 09 00 1014-99 D co CCGG 60.240 -999.990 ... R5 2008 10 23 15 36 00 -40.6800 144.6800 164.00 94.00 70.00 262638 CGO 2008 09 02 00 29 00 3313-99 D co CCGG 61.470 -999.990 ..I R5 2008 10 23 14 54 00 -40.6800 144.6800 164.00 94.00 70.00 262632 CGO 2008 09 02 00 29 00 3314-99 D co CCGG 60.700 -999.990 ... R5 2008 10 23 15 08 00 -40.6800 144.6800 164.00 94.00 70.00 262633 CGO 2008 09 16 01 20 00 4908-99 D co CCGG 60.360 -999.990 ..I R5 2008 10 23 16 33 00 -40.6800 144.6800 164.00 94.00 70.00 262634 CGO 2008 09 22 02 11 00 3273-99 D co CCGG 64.190 -999.990 ..I V2 2008 11 20 14 35 00 -40.6800 144.6800 164.00 94.00 70.00 264177 CGO 2008 09 22 02 11 00 3274-99 D co CCGG 62.900 -999.990 ... V2 2008 11 20 14 51 00 -40.6800 144.6800 164.00 94.00 70.00 264178 CGO 2008 09 29 00 56 00 787-99 D co CCGG 65.180 -999.990 ..I V2 2008 11 20 14 05 00 -40.6800 144.6800 164.00 94.00 70.00 264175 CGO 2008 09 29 00 56 00 788-99 D co CCGG 63.950 -999.990 ... V2 2008 11 20 14 20 00 -40.6800 144.6800 164.00 94.00 70.00 264176 CGO 2008 10 06 00 40 00 3729-99 D co CCGG 63.810 -999.990 ..I R5 2008 11 20 13 59 00 -40.6800 144.6800 164.00 94.00 70.00 264171 CGO 2008 10 06 00 40 00 3730-99 D co CCGG 61.940 -999.990 ... R5 2008 11 20 14 13 00 -40.6800 144.6800 164.00 94.00 70.00 264172 CGO 2008 10 13 01 34 00 3531-99 D co CCGG 62.660 -999.990 ..I R5 2008 11 20 14 28 00 -40.6800 144.6800 164.00 94.00 70.00 264173 CGO 2008 10 13 01 34 00 3532-99 D co CCGG 60.870 -999.990 ... R5 2008 11 20 14 42 00 -40.6800 144.6800 164.00 94.00 70.00 264174 CGO 2008 10 21 01 31 00 4521-99 D co CCGG 63.220 -999.990 ..I V2 2009 04 14 14 39 00 -40.6830 144.6900 164.00 94.00 70.00 273465 CGO 2008 10 21 01 31 00 4522-99 D co CCGG 61.780 -999.990 ... V2 2009 04 14 14 54 00 -40.6830 144.6900 164.00 94.00 70.00 273466 CGO 2008 10 28 00 23 00 1759-99 D co CCGG 62.300 -999.990 ..I V2 2009 04 14 14 08 00 -40.6830 144.6900 164.00 94.00 70.00 273463 CGO 2008 10 28 00 23 00 1760-99 D co CCGG 60.050 -999.990 ... V2 2009 04 14 14 23 00 -40.6830 144.6900 164.00 94.00 70.00 273464 CGO 2008 11 04 01 43 00 4061-99 D co CCGG 59.940 -999.990 ..I V2 2009 03 20 11 48 00 -40.6830 144.6900 164.00 94.00 70.00 271779 CGO 2008 11 04 01 43 00 4062-99 D co CCGG 57.850 -999.990 ... V2 2009 03 20 12 03 00 -40.6830 144.6900 164.00 94.00 70.00 271780 CGO 2008 11 13 23 35 00 3711-99 D co CCGG 60.390 -999.990 ..I V2 2009 03 20 11 17 00 -40.6830 144.6900 164.00 94.00 70.00 271777 CGO 2008 11 13 23 35 00 3712-99 D co CCGG 58.240 -999.990 ... V2 2009 03 20 11 32 00 -40.6830 144.6900 164.00 94.00 70.00 271778 CGO 2008 11 21 01 12 00 6089-66 D co CCGG 56.660 -999.990 ..I V2 2009 05 21 12 32 00 -40.6830 144.6900 164.00 94.00 70.00 275531 CGO 2008 11 21 01 12 00 6090-66 D co CCGG 56.300 -999.990 ... V2 2009 05 21 12 48 00 -40.6830 144.6900 164.00 94.00 70.00 275532 CGO 2008 12 03 00 29 00 2281-99 D co CCGG 51.930 -999.990 ..I V2 2009 05 21 13 03 00 -40.6830 144.6900 164.00 94.00 70.00 275529 CGO 2008 12 03 00 29 00 2282-99 D co CCGG 51.410 -999.990 ... V2 2009 05 21 13 18 00 -40.6830 144.6900 164.00 94.00 70.00 275530 CGO 2008 12 09 03 34 00 4181-99 D co CCGG 50.590 -999.990 ..I V2 2009 03 19 13 07 00 -40.6830 144.6900 164.00 94.00 70.00 271781 CGO 2008 12 09 03 34 00 4182-99 D co CCGG 49.750 -999.990 ... V2 2009 03 19 13 22 00 -40.6830 144.6900 164.00 94.00 70.00 271782 CGO 2008 12 16 02 19 00 6193-66 D co CCGG 50.770 -999.990 ..I V2 2009 03 19 12 36 00 -40.6830 144.6900 164.00 94.00 70.00 271783 CGO 2008 12 16 02 19 00 6194-66 D co CCGG 49.250 -999.990 ... V2 2009 03 19 12 52 00 -40.6830 144.6900 164.00 94.00 70.00 271784 CGO 2008 12 22 23 58 00 1989-99 D co CCGG 48.990 -999.990 ..I V2 2009 07 16 13 34 00 -40.6830 144.6900 164.00 94.00 70.00 278995 CGO 2008 12 22 23 58 00 1990-99 D co CCGG 48.350 -999.990 ... V2 2009 07 16 13 50 00 -40.6830 144.6900 164.00 94.00 70.00 278996 CGO 2009 01 14 01 26 00 1505-99 D co CCGG 49.300 -999.990 ..I V2 2009 07 16 14 05 00 -40.6830 144.6900 164.00 94.00 70.00 278997 CGO 2009 01 14 01 26 00 1506-99 D co CCGG 47.940 -999.990 ... V2 2009 07 16 14 21 00 -40.6830 144.6900 164.00 94.00 70.00 278998 CGO 2009 02 05 02 36 00 711-99 D co CCGG 52.990 -999.990 .X. V2 2009 07 13 13 37 00 -40.6830 144.6900 164.00 94.00 70.00 279454 CGO 2009 02 05 02 36 00 712-99 D co CCGG 52.230 -999.990 .X. V2 2009 07 13 13 52 00 -40.6830 144.6900 164.00 94.00 70.00 279455 CGO 2009 03 05 23 45 00 317-99 D co CCGG 43.110 -999.990 ... V2 2009 07 13 14 08 00 -40.6830 144.6900 164.00 94.00 70.00 279456 CGO 2009 03 05 23 45 00 318-99 D co CCGG 41.870 -999.990 ... V2 2009 07 13 14 23 00 -40.6830 144.6900 164.00 94.00 70.00 279457 CGO 2009 03 17 00 28 00 1267-99 D co CCGG 43.600 -999.990 ... V2 2009 07 17 13 14 00 -40.6830 144.6900 164.00 94.00 70.00 279933 CGO 2009 03 17 00 28 00 1268-99 D co CCGG 43.500 -999.990 ... V2 2009 07 17 13 29 00 -40.6830 144.6900 164.00 94.00 70.00 279934 CGO 2009 03 26 00 30 00 6233-66 D co CCGG 44.190 -999.990 ... V2 2009 07 17 12 43 00 -40.6830 144.6900 164.00 94.00 70.00 279935 CGO 2009 03 26 00 30 00 6234-66 D co CCGG 42.990 -999.990 ... V2 2009 07 17 12 58 00 -40.6830 144.6900 164.00 94.00 70.00 279936 CGO 2009 04 02 22 52 00 3467-99 D co CCGG 45.550 -999.990 ... V2 2009 07 13 12 35 00 -40.6830 144.6900 164.00 94.00 70.00 279452 CGO 2009 04 02 22 52 00 3468-99 D co CCGG 45.640 -999.990 ... V2 2009 07 13 12 51 00 -40.6830 144.6900 164.00 94.00 70.00 279453 CGO 2009 04 07 00 21 00 957-99 D co CCGG 44.020 -999.990 ... V2 2009 07 13 13 06 00 -40.6830 144.6900 164.00 94.00 70.00 279450 CGO 2009 04 07 00 21 00 958-99 D co CCGG 43.590 -999.990 ... V2 2009 07 13 13 22 00 -40.6830 144.6900 164.00 94.00 70.00 279451 CGO 2009 04 15 00 13 00 1455-99 D co CCGG 44.090 -999.990 ... V2 2009 07 17 13 45 00 -40.6830 144.6900 164.00 94.00 70.00 279939 CGO 2009 04 15 00 13 00 1456-99 D co CCGG 43.640 -999.990 ... V2 2009 07 17 14 00 00 -40.6830 144.6900 164.00 94.00 70.00 279940 CGO 2009 05 01 00 48 00 307-99 D co CCGG 122.460 -999.990 N.. V2 2009 07 17 14 15 00 -40.6830 144.6900 164.00 94.00 70.00 279937 CGO 2009 05 01 00 48 00 308-99 D co CCGG 45.180 -999.990 ... V2 2009 07 17 14 31 00 -40.6830 144.6900 164.00 94.00 70.00 279938 CGO 2009 05 06 00 08 00 4659-99 D co CCGG 47.890 -999.990 ... V2 2009 07 27 14 39 00 -40.6830 144.6900 164.00 94.00 70.00 280554 CGO 2009 05 06 00 08 00 4660-99 D co CCGG 48.670 -999.990 ... V2 2009 07 27 14 54 00 -40.6830 144.6900 164.00 94.00 70.00 280555 CGO 2009 05 13 02 09 00 2011-99 D co CCGG 52.480 -999.990 N.. V2 2009 07 27 14 08 00 -40.6830 144.6900 164.00 94.00 70.00 280552 CGO 2009 05 13 02 09 00 2012-99 D co CCGG 49.410 -999.990 ... V2 2009 07 27 14 24 00 -40.6830 144.6900 164.00 94.00 70.00 280553 CGO 2009 05 26 00 24 00 2437-99 D co CCGG 50.830 -999.990 ... V2 2009 07 27 15 10 00 -40.6830 144.6900 164.00 94.00 70.00 280556 CGO 2009 05 26 00 24 00 2438-99 D co CCGG 49.280 -999.990 ... V2 2009 07 27 15 25 00 -40.6830 144.6900 164.00 94.00 70.00 280557 CGO 2009 06 11 00 26 00 3501-99 D co CCGG 51.520 -999.990 ... V2 2009 07 27 15 41 00 -40.6830 144.6900 164.00 94.00 70.00 280558 CGO 2009 06 11 00 26 00 3502-99 D co CCGG 50.130 -999.990 ... V2 2009 07 27 15 56 00 -40.6830 144.6900 164.00 94.00 70.00 280559 CGO 2009 06 25 00 51 00 1109-99 D co CCGG 55.530 -999.990 ... R5 2009 09 24 15 55 00 -40.6830 144.6900 164.00 94.00 70.00 283787 CGO 2009 06 25 00 51 00 1110-99 D co CCGG 54.240 -999.990 ... R5 2009 09 24 16 09 00 -40.6830 144.6900 164.00 94.00 70.00 283788 CGO 2009 07 03 00 28 00 3231-99 D co CCGG 51.920 -999.990 ... R5 2009 09 24 15 26 00 -40.6830 144.6900 164.00 94.00 70.00 283789 CGO 2009 07 03 00 28 00 3232-99 D co CCGG 54.250 -999.990 ... R5 2009 09 24 15 41 00 -40.6830 144.6900 164.00 94.00 70.00 283790 CGO 2009 07 22 01 25 00 3849-99 D co CCGG 55.950 -999.990 ... R5 2009 09 24 14 58 00 -40.6830 144.6900 164.00 94.00 70.00 283785 CGO 2009 07 22 01 25 00 3850-99 D co CCGG 54.470 -999.990 ... R5 2009 09 24 15 12 00 -40.6830 144.6900 164.00 94.00 70.00 283786 CGO 2009 07 27 01 25 00 4777-99 D co CCGG 57.580 -999.990 ... R5 2009 09 24 14 29 00 -40.6830 144.6900 164.00 94.00 70.00 283783 CGO 2009 07 27 01 25 00 4778-99 D co CCGG 56.190 -999.990 ... R5 2009 09 24 14 43 00 -40.6830 144.6900 164.00 94.00 70.00 283784 CGO 2009 08 03 01 36 00 3217-99 D co CCGG 65.080 -999.990 N.. V2 2010 01 20 13 33 00 -40.6830 144.6900 164.00 94.00 70.00 288628 CGO 2009 08 03 01 36 00 3218-99 D co CCGG 56.390 -999.990 ... V2 2010 01 20 13 48 00 -40.6830 144.6900 164.00 94.00 70.00 288629 CGO 2009 08 17 00 55 00 1787-99 D co CCGG 62.180 -999.990 N.. V2 2010 01 20 14 04 00 -40.6830 144.6900 164.00 94.00 70.00 288626 CGO 2009 08 17 00 55 00 1788-99 D co CCGG 59.200 -999.990 ... V2 2010 01 20 14 19 00 -40.6830 144.6900 164.00 94.00 70.00 288627 CGO 2009 08 26 02 43 00 1847-99 D co CCGG 62.710 -999.990 N.. V2 2010 01 20 13 02 00 -40.6830 144.6900 164.00 94.00 70.00 288622 CGO 2009 08 26 02 43 00 1848-99 D co CCGG 59.910 -999.990 ... V2 2010 01 20 13 18 00 -40.6830 144.6900 164.00 94.00 70.00 288623 CGO 2009 08 31 00 17 00 1039-99 D co CCGG 66.170 -999.990 N.. V2 2010 01 20 12 32 00 -40.6830 144.6900 164.00 94.00 70.00 288624 CGO 2009 08 31 00 17 00 1040-99 D co CCGG 60.970 -999.990 ... V2 2010 01 20 12 47 00 -40.6830 144.6900 164.00 94.00 70.00 288625 CGO 2009 09 10 00 24 00 277-99 D co CCGG 66.690 -999.990 N.. V2 2010 02 22 17 08 00 -40.6830 144.6900 164.00 94.00 70.00 290438 CGO 2009 09 10 00 24 00 278-99 D co CCGG 61.760 -999.990 ... V2 2010 02 22 17 24 00 -40.6830 144.6900 164.00 94.00 70.00 290439 CGO 2009 09 23 04 28 00 1493-99 D co CCGG 64.780 -999.990 N.. V2 2010 02 22 16 38 00 -40.6830 144.6900 164.00 94.00 70.00 290436 CGO 2009 09 23 04 28 00 1494-99 D co CCGG 60.660 -999.990 ... V2 2010 02 22 16 53 00 -40.6830 144.6900 164.00 94.00 70.00 290437 CGO 2009 10 01 00 34 00 6193-66 D co CCGG 60.010 -999.990 ... V2 2010 02 23 17 11 00 -40.6830 144.6900 164.00 94.00 70.00 290430 CGO 2009 10 01 00 34 00 6194-66 D co CCGG 59.900 -999.990 ... V2 2010 02 23 17 26 00 -40.6830 144.6900 164.00 94.00 70.00 290431 CGO 2009 10 21 00 37 00 3227-99 D co CCGG 58.630 -999.990 ... V2 2010 02 23 17 41 00 -40.6830 144.6900 164.00 94.00 70.00 290432 CGO 2009 10 21 00 37 00 3228-99 D co CCGG 56.590 -999.990 ... V2 2010 02 23 17 57 00 -40.6830 144.6900 164.00 94.00 70.00 290433 CGO 2009 11 03 03 10 00 1587-99 D co CCGG 59.380 -999.990 P.. V2 2010 04 14 15 22 00 -40.6830 144.6900 164.00 94.00 70.00 293948 CGO 2009 11 03 03 10 00 1588-99 D co CCGG 56.000 -999.990 P.. V2 2010 04 14 15 37 00 -40.6830 144.6900 164.00 94.00 70.00 293949 CGO 2009 11 15 23 43 00 3997-99 D co CCGG 80.970 -999.990 N.. V2 2010 04 13 16 24 00 -40.6830 144.6900 164.00 94.00 70.00 293950 CGO 2009 11 15 23 43 00 3998-99 D co CCGG 78.160 -999.990 N.. V2 2010 04 13 16 39 00 -40.6830 144.6900 164.00 94.00 70.00 293951 CGO 2009 11 24 23 38 00 3063-99 D co CCGG 55.410 -999.990 ... V2 2010 02 23 16 40 00 -40.6830 144.6900 164.00 94.00 70.00 290426 CGO 2009 11 24 23 38 00 3064-99 D co CCGG 56.670 -999.990 ... V2 2010 02 23 16 56 00 -40.6830 144.6900 164.00 94.00 70.00 290427 CGO 2009 12 04 01 07 00 3251-99 D co CCGG 49.550 -999.990 ... V2 2010 02 23 16 10 00 -40.6830 144.6900 164.00 94.00 70.00 290428 CGO 2009 12 04 01 07 00 3252-99 D co CCGG 47.950 -999.990 ... V2 2010 02 23 16 25 00 -40.6830 144.6900 164.00 94.00 70.00 290429 CGO 2009 12 18 01 45 00 4901-99 D co CCGG 48.570 -999.990 ... V2 2010 04 13 15 53 00 -40.6830 144.6900 164.00 94.00 70.00 293944 CGO 2009 12 18 01 45 00 4902-99 D co CCGG 45.710 -999.990 ... V2 2010 04 13 16 08 00 -40.6830 144.6900 164.00 94.00 70.00 293945 CGO 2009 12 28 23 24 00 2931-99 D co CCGG 50.250 -999.990 N.. V2 2010 04 13 15 22 00 -40.6830 144.6900 164.00 94.00 70.00 293946 CGO 2009 12 28 23 24 00 2932-99 D co CCGG 46.050 -999.990 ... V2 2010 04 13 15 38 00 -40.6830 144.6900 164.00 94.00 70.00 293947 CGO 2010 01 04 23 55 00 2611-99 D co CCGG 49.270 -999.990 ... V2 2010 06 04 11 17 00 -40.6830 144.6900 164.00 94.00 70.00 297560 CGO 2010 01 04 23 55 00 2612-99 D co CCGG 43.520 -999.990 ... V2 2010 06 04 11 32 00 -40.6830 144.6900 164.00 94.00 70.00 297561 CGO 2010 01 13 04 12 00 3935-99 D co CCGG 44.810 -999.990 ... V2 2010 06 04 11 48 00 -40.6830 144.6900 164.00 94.00 70.00 297558 CGO 2010 01 13 04 12 00 3936-99 D co CCGG 41.810 -999.990 ... V2 2010 06 04 12 03 00 -40.6830 144.6900 164.00 94.00 70.00 297559 CGO 2010 01 28 23 59 00 4471-99 D co CCGG 42.420 -999.990 ... V2 2010 06 07 12 55 00 -40.6830 144.6900 164.00 94.00 70.00 297572 CGO 2010 01 28 23 59 00 4472-99 D co CCGG 42.410 -999.990 ... V2 2010 06 07 13 10 00 -40.6830 144.6900 164.00 94.00 70.00 297573 CGO 2010 02 12 02 30 00 205-99 D co CCGG 44.110 -999.990 ... V2 2010 06 07 12 22 00 -40.6830 144.6900 164.00 94.00 70.00 297570 CGO 2010 02 12 02 30 00 206-99 D co CCGG 42.830 -999.990 ... V2 2010 06 07 12 37 00 -40.6830 144.6900 164.00 94.00 70.00 297571 CGO 2010 03 09 00 49 00 4483-99 D co CCGG 43.560 -999.990 N.. V2 2010 07 09 16 27 00 -40.6830 144.6900 164.00 94.00 70.00 299881 CGO 2010 03 09 00 49 00 4484-99 D co CCGG 40.090 -999.990 ... V2 2010 07 09 16 43 00 -40.6830 144.6900 164.00 94.00 70.00 299882 CGO 2010 03 22 01 53 00 2905-99 D co CCGG 45.000 -999.990 N.. V2 2010 07 09 15 57 00 -40.6830 144.6900 164.00 94.00 70.00 299879 CGO 2010 03 22 01 53 00 2906-99 D co CCGG 41.910 -999.990 ... V2 2010 07 09 16 12 00 -40.6830 144.6900 164.00 94.00 70.00 299880 CGO 2010 04 08 01 10 00 2385-99 D co CCGG 71.150 -999.990 P.. V2 2010 07 12 10 53 00 -40.6830 144.6900 164.00 94.00 70.00 299885 CGO 2010 04 08 01 10 00 2386-99 D co CCGG 66.940 -999.990 P.. V2 2010 07 12 11 08 00 -40.6830 144.6900 164.00 94.00 70.00 299886 CGO 2010 04 13 02 26 00 917-99 D co CCGG 49.220 -999.990 N.. V2 2010 07 12 10 23 00 -40.6830 144.6900 164.00 94.00 70.00 299883 CGO 2010 04 13 02 26 00 918-99 D co CCGG 44.140 -999.990 ... V2 2010 07 12 10 38 00 -40.6830 144.6900 164.00 94.00 70.00 299884 CGO 2010 05 05 01 20 00 1393-99 D co CCGG 47.410 -999.990 ... V2 2010 08 05 10 46 00 -40.6830 144.6900 164.00 94.00 70.00 301051 CGO 2010 05 05 01 20 00 1394-99 D co CCGG 72.810 -999.990 N.. V2 2010 08 05 11 01 00 -40.6830 144.6900 164.00 94.00 70.00 301052 CGO 2010 05 11 00 08 00 1783-99 D co CCGG 49.650 -999.990 ... V2 2010 08 05 10 15 00 -40.6830 144.6900 164.00 94.00 70.00 301049 CGO 2010 05 11 00 08 00 1784-99 D co CCGG 46.860 -999.990 ... V2 2010 08 05 10 31 00 -40.6830 144.6900 164.00 94.00 70.00 301050 CGO 2010 06 03 03 05 00 2675-99 D co CCGG 55.650 -999.990 ... V2 2010 09 03 14 41 00 -40.6830 144.6900 164.00 94.00 70.00 303171 CGO 2010 06 03 03 05 00 2676-99 D co CCGG 52.470 -999.990 ... V2 2010 09 03 14 57 00 -40.6830 144.6900 164.00 94.00 70.00 303172 CGO 2010 06 09 00 32 00 729-99 D co CCGG 56.870 -999.990 N.. V2 2010 09 03 14 11 00 -40.6830 144.6900 164.00 94.00 70.00 303169 CGO 2010 06 09 00 32 00 730-99 D co CCGG 49.880 -999.990 ... V2 2010 09 03 14 26 00 -40.6830 144.6900 164.00 94.00 70.00 303170 CGO 2010 06 17 02 00 00 5065-99 D co CCGG 53.420 -999.990 ... V2 2010 09 24 11 42 00 -40.6830 144.6900 164.00 94.00 70.00 304335 CGO 2010 06 17 02 00 00 5066-99 D co CCGG 52.450 -999.990 ... V2 2010 09 24 11 57 00 -40.6830 144.6900 164.00 94.00 70.00 304336 CGO 2010 07 14 00 23 00 5067-99 D co CCGG 60.360 -999.990 ... V2 2010 09 24 11 12 00 -40.6830 144.6900 164.00 94.00 70.00 304337 CGO 2010 07 14 00 23 00 5068-99 D co CCGG 57.580 -999.990 ... V2 2010 09 24 11 27 00 -40.6830 144.6900 164.00 94.00 70.00 304338 CGO 2010 07 22 01 28 00 151-99 D co CCGG 59.410 -999.990 ... V2 2010 09 24 10 40 00 -40.6830 144.6900 164.00 94.00 70.00 304333 CGO 2010 07 22 01 28 00 152-99 D co CCGG 57.580 -999.990 ... V2 2010 09 24 10 55 00 -40.6830 144.6900 164.00 94.00 70.00 304334 CGO 2010 08 03 00 43 00 3449-99 D co CCGG 64.300 -999.990 N.. V2 2010 09 24 10 09 00 -40.6830 144.6900 164.00 94.00 70.00 304331 CGO 2010 08 03 00 43 00 3450-99 D co CCGG 60.710 -999.990 ... V2 2010 09 24 10 25 00 -40.6830 144.6900 164.00 94.00 70.00 304332 CGO 2010 08 12 00 43 00 5063-99 D co CCGG 64.180 -999.990 ... V2 2010 10 07 14 29 00 -40.6830 144.6900 164.00 94.00 70.00 305128 CGO 2010 08 12 00 43 00 5064-99 D co CCGG 62.390 -999.990 ... V2 2010 10 07 14 44 00 -40.6830 144.6900 164.00 94.00 70.00 305129 CGO 2010 08 20 00 23 00 1605-99 D co CCGG 64.480 -999.990 ... V2 2010 10 07 13 58 00 -40.6830 144.6900 164.00 94.00 70.00 305130 CGO 2010 08 20 00 23 00 1606-99 D co CCGG 62.480 -999.990 ... V2 2010 10 07 14 14 00 -40.6830 144.6900 164.00 94.00 70.00 305131 CGO 2010 08 26 01 29 00 3215-99 D co CCGG 78.380 -999.990 N.. V2 2010 10 07 13 28 00 -40.6830 144.6900 164.00 94.00 70.00 305126 CGO 2010 08 26 01 29 00 3216-99 D co CCGG 116.010 -999.990 N.. V2 2010 10 07 13 43 00 -40.6830 144.6900 164.00 94.00 70.00 305127 CGO 2010 09 01 00 55 00 675-99 D co CCGG 69.310 -999.990 N.. V2 2010 10 07 12 56 00 -40.6830 144.6900 164.00 94.00 70.00 305124 CGO 2010 09 01 00 55 00 676-99 D co CCGG 77.740 -999.990 N.. V2 2010 10 07 13 11 00 -40.6830 144.6900 164.00 94.00 70.00 305125 CGO 2010 09 10 02 44 00 1731-99 D co CCGG 63.790 -999.990 N.. V2 2010 11 12 11 59 00 -40.6830 144.6900 164.00 94.00 70.00 307445 CGO 2010 09 10 02 44 00 1732-99 D co CCGG 88.930 -999.990 N.. V2 2010 11 12 12 15 00 -40.6830 144.6900 164.00 94.00 70.00 307446 CGO 2010 09 16 09 52 00 3217-99 D co CCGG 82.230 -999.990 N.. V2 2010 11 15 17 07 00 -40.6830 144.6900 164.00 94.00 70.00 307463 CGO 2010 09 16 09 52 00 3218-99 D co CCGG 111.190 -999.990 N.. V2 2010 11 15 17 23 00 -40.6830 144.6900 164.00 94.00 70.00 307464 CGO 2010 09 24 00 30 00 27-99 D co CCGG 79.120 -999.990 N.. V2 2011 02 28 15 46 00 -40.6830 144.6900 164.00 94.00 70.00 313111 CGO 2010 09 24 00 30 00 28-99 D co CCGG 80.700 -999.990 N.. V2 2011 02 28 16 02 00 -40.6830 144.6900 164.00 94.00 70.00 313112 CGO 2010 09 29 01 04 00 3899-99 D co CCGG 70.320 -999.990 P.. V2 2011 02 28 15 13 00 -40.6830 144.6900 164.00 94.00 70.00 313114 CGO 2010 09 29 01 04 00 3900-99 D co CCGG 77.570 -999.990 P.. V2 2011 02 28 15 30 00 -40.6830 144.6900 164.00 94.00 70.00 313113 CGO 2010 10 18 00 43 00 3439-99 D co CCGG 71.640 -999.990 ... V2 2011 02 28 14 08 00 -40.6830 144.6900 164.00 94.00 70.00 313107 CGO 2010 10 18 00 43 00 3440-99 D co CCGG 70.890 -999.990 ... V2 2011 02 28 14 24 00 -40.6830 144.6900 164.00 94.00 70.00 313108 CGO 2010 11 02 01 12 00 4825-99 D co CCGG 82.500 -999.990 N.. V2 2011 02 28 14 41 00 -40.6830 144.6900 164.00 94.00 70.00 313109 CGO 2010 11 02 01 12 00 4826-99 D co CCGG 78.390 -999.990 N.. V2 2011 02 28 14 57 00 -40.6830 144.6900 164.00 94.00 70.00 313110 CGO 2010 11 18 00 43 00 5115-99 G co CCGG 64.850 -999.990 ... V4 2011 02 28 11 21 00 -40.6830 144.6900 164.00 94.00 70.00 313101 CGO 2010 11 18 00 43 00 5116-99 G co CCGG 63.830 -999.990 ... V4 2011 02 28 11 36 00 -40.6830 144.6900 164.00 94.00 70.00 313102 CGO 2010 12 10 00 49 00 3533-99 G co CCGG 57.130 -999.990 ... V4 2011 02 28 11 51 00 -40.6830 144.6900 164.00 94.00 70.00 313099 CGO 2010 12 10 00 49 00 3534-99 G co CCGG 56.320 -999.990 ... V4 2011 02 28 12 07 00 -40.6830 144.6900 164.00 94.00 70.00 313100 CGO 2010 12 20 23 52 00 3874-99 G co CCGG 54.040 -999.990 ... V2 2011 03 07 12 50 00 -40.6830 144.6900 164.00 94.00 70.00 313635 CGO 2011 01 18 00 00 00 3293-99 G co CCGG 48.680 -999.990 ... V2 2011 03 07 13 07 00 -40.6830 144.6900 164.00 94.00 70.00 313636 CGO 2011 01 18 00 00 00 3294-99 G co CCGG 46.780 -999.990 ... V2 2011 03 07 13 23 00 -40.6830 144.6900 164.00 94.00 70.00 313637 CGO 2011 01 23 23 57 00 1809-99 G co CCGG 50.000 -999.990 N.. V2 2011 03 31 13 33 00 -40.6830 144.6900 164.00 94.00 70.00 314937 CGO 2011 01 23 23 57 00 1810-99 G co CCGG 44.090 -999.990 ... V2 2011 03 31 13 49 00 -40.6830 144.6900 164.00 94.00 70.00 314938 CGO 2011 02 03 01 20 00 4843-99 G co CCGG 47.740 -999.990 N.. V2 2011 03 31 14 05 00 -40.6830 144.6900 164.00 94.00 70.00 314939 CGO 2011 02 03 01 20 00 4844-99 G co CCGG 42.510 -999.990 ... V2 2011 03 31 14 22 00 -40.6830 144.6900 164.00 94.00 70.00 314940 CGO 2011 02 21 00 37 00 1775-99 G co CCGG 43.120 -999.990 N.. V2 2011 04 20 14 16 00 -40.6830 144.6900 164.00 94.00 70.00 316158 CGO 2011 02 21 00 37 00 1776-99 G co CCGG 39.800 -999.990 ... V2 2011 04 20 14 32 00 -40.6830 144.6900 164.00 94.00 70.00 316159 CGO 2011 03 03 02 52 00 1733-99 G co CCGG 45.670 -999.990 N.. V2 2011 04 20 14 49 00 -40.6830 144.6900 164.00 94.00 70.00 316160 CGO 2011 03 03 02 52 00 1734-99 G co CCGG 40.320 -999.990 ... V2 2011 04 20 15 05 00 -40.6830 144.6900 164.00 94.00 70.00 316161 CGO 2011 03 16 23 39 00 2315-99 G co CCGG 50.520 -999.990 N.. V4 2011 06 06 14 20 00 -40.6830 144.6900 164.00 94.00 70.00 318728 CGO 2011 03 16 23 39 00 2316-99 G co CCGG 42.790 -999.990 ... V4 2011 06 06 14 36 00 -40.6830 144.6900 164.00 94.00 70.00 318729 CGO 2011 03 31 00 09 00 1455-99 G co CCGG 56.770 -999.990 N.. V4 2011 06 06 13 50 00 -40.6830 144.6900 164.00 94.00 70.00 318730 CGO 2011 03 31 00 09 00 1456-99 G co CCGG 41.050 -999.990 ... V4 2011 06 06 14 05 00 -40.6830 144.6900 164.00 94.00 70.00 318731 CGO 2011 04 20 00 55 00 279-99 G co CCGG 46.380 -999.990 ... V2 2011 06 21 13 09 00 -40.6830 144.6900 164.00 94.00 70.00 319516 CGO 2011 04 20 00 55 00 280-99 G co CCGG 44.790 -999.990 ... V2 2011 06 21 13 25 00 -40.6830 144.6900 164.00 94.00 70.00 319517 CGO 2011 05 04 11 45 00 2003-99 G co CCGG 48.590 -999.990 ... V2 2011 06 21 13 41 00 -40.6830 144.6900 164.00 94.00 70.00 319518 CGO 2011 05 04 11 45 00 2004-99 G co CCGG 47.050 -999.990 ... V2 2011 06 21 13 57 00 -40.6830 144.6900 164.00 94.00 70.00 319519 CGO 2011 05 12 03 54 00 511-99 G co CCGG 48.510 -999.990 ... V2 2011 08 18 14 00 00 -40.6830 144.6900 164.00 94.00 70.00 322321 CGO 2011 05 12 03 54 00 512-99 G co CCGG 47.730 -999.990 ... V2 2011 08 18 14 17 00 -40.6830 144.6900 164.00 94.00 70.00 322322 CGO 2011 05 26 00 22 00 3349-99 G co CCGG 50.160 -999.990 ... V2 2011 08 18 14 33 00 -40.6830 144.6900 164.00 94.00 70.00 322323 CGO 2011 05 26 00 22 00 3350-99 G co CCGG 50.780 -999.990 ... V2 2011 08 18 14 49 00 -40.6830 144.6900 164.00 94.00 70.00 322324 CGO 2011 06 07 01 15 00 2197-99 G co CCGG 50.240 -999.990 ... V4 2011 09 27 11 04 00 -40.6830 144.6900 164.00 94.00 70.00 324207 CGO 2011 06 07 01 15 00 2198-99 G co CCGG 49.710 -999.990 ... V4 2011 09 27 11 19 00 -40.6830 144.6900 164.00 94.00 70.00 324208 CGO 2011 06 21 01 46 00 3315-99 G co CCGG 51.820 -999.990 ... V4 2011 09 27 10 03 00 -40.6830 144.6900 164.00 94.00 70.00 324206 CGO 2011 06 21 01 46 00 3316-99 G co CCGG 49.510 -999.990 ... V4 2011 09 27 10 18 00 -40.6830 144.6900 164.00 94.00 70.00 324205 CGO 2011 07 07 01 24 00 3625-99 G co CCGG 56.180 -999.990 ... V4 2011 09 23 11 13 00 -40.6830 144.6900 164.00 94.00 70.00 324081 CGO 2011 07 07 01 24 00 3626-99 G co CCGG 54.210 -999.990 ... V4 2011 09 23 11 28 00 -40.6830 144.6900 164.00 94.00 70.00 324082 CGO 2011 07 13 12 58 00 4515-99 G co CCGG 55.050 -999.990 ... V4 2011 09 23 10 43 00 -40.6830 144.6900 164.00 94.00 70.00 324083 CGO 2011 07 13 12 58 00 4516-99 G co CCGG 52.570 -999.990 ... V4 2011 09 23 10 58 00 -40.6830 144.6900 164.00 94.00 70.00 324084 CGO 2011 08 26 00 57 00 2629-99 G co CCGG 59.880 -999.990 ... V2 2011 10 31 13 19 00 -40.6830 144.6900 164.00 94.00 70.00 325559 CGO 2011 08 26 00 57 00 2630-99 G co CCGG 59.100 -999.990 ... V2 2011 10 31 13 35 00 -40.6830 144.6900 164.00 94.00 70.00 325560 CGO 2011 09 07 00 13 00 5195-99 G co CCGG 60.450 -999.990 ... V2 2011 10 31 13 51 00 -40.6830 144.6900 164.00 94.00 70.00 325561 CGO 2011 09 07 00 13 00 5196-99 G co CCGG 58.860 -999.990 ... V2 2011 10 31 14 07 00 -40.6830 144.6900 164.00 94.00 70.00 325562 CGO 2011 09 14 01 06 00 2121-99 G co CCGG 62.350 -999.990 ... V4 2011 11 04 15 23 00 -40.6830 144.6900 164.00 94.00 70.00 326126 CGO 2011 09 14 01 06 00 2122-99 G co CCGG 61.500 -999.990 ... V4 2011 11 04 15 38 00 -40.6830 144.6900 164.00 94.00 70.00 326127 CGO 2011 09 23 00 44 00 3275-99 G co CCGG 62.900 -999.990 ... V4 2011 11 04 15 53 00 -40.6830 144.6900 164.00 94.00 70.00 326128 CGO 2011 09 23 00 44 00 3276-99 G co CCGG 60.840 -999.990 ... V4 2011 11 04 16 08 00 -40.6830 144.6900 164.00 94.00 70.00 326129 CGO 2011 10 20 23 38 00 1917-99 G co CCGG 64.550 -999.990 ... V2 2011 12 15 14 25 00 -40.6830 144.6900 164.00 94.00 70.00 327760 CGO 2011 10 20 23 38 00 1918-99 G co CCGG 64.020 -999.990 ... V2 2011 12 15 14 41 00 -40.6830 144.6900 164.00 94.00 70.00 327761 CGO 2011 10 31 00 40 00 335-99 G co CCGG 63.910 -999.990 ... V2 2011 12 15 14 57 00 -40.6830 144.6900 164.00 94.00 70.00 327762 CGO 2011 10 31 00 40 00 336-99 G co CCGG 62.390 -999.990 ... V2 2011 12 15 15 13 00 -40.6830 144.6900 164.00 94.00 70.00 327763 CGO 2011 11 16 02 45 00 5213-99 G co CCGG 57.720 -999.990 ... V4 2012 04 02 14 15 00 -40.6830 144.6900 164.00 94.00 70.00 333266 CGO 2011 11 16 02 45 00 5214-99 G co CCGG 56.480 -999.990 ... V4 2012 04 02 14 31 00 -40.6830 144.6900 164.00 94.00 70.00 333267 CGO 2011 11 23 02 45 00 151-99 G co CCGG 56.860 -999.990 ... V4 2012 04 02 14 46 00 -40.6830 144.6900 164.00 94.00 70.00 333268 CGO 2011 11 23 02 45 00 152-99 G co CCGG 55.980 -999.990 ... V4 2012 04 02 15 01 00 -40.6830 144.6900 164.00 94.00 70.00 333269 CGO 2011 11 30 01 18 00 2977-99 G co CCGG 54.800 -999.990 ... V4 2012 03 27 12 25 00 -40.6830 144.6900 164.00 94.00 70.00 333262 CGO 2011 11 30 01 18 00 2978-99 G co CCGG 54.120 -999.990 ... V4 2012 03 27 12 41 00 -40.6830 144.6900 164.00 94.00 70.00 333263 CGO 2011 12 11 23 39 00 4759-99 G co CCGG 50.860 -999.990 ... V4 2012 03 27 11 55 00 -40.6830 144.6900 164.00 94.00 70.00 333264 CGO 2011 12 11 23 39 00 4760-99 G co CCGG 51.100 -999.990 ... V4 2012 03 27 12 10 00 -40.6830 144.6900 164.00 94.00 70.00 333265 CGO 2012 01 03 23 33 00 2801-99 G co CCGG 42.160 -999.990 N.. V4 2012 04 19 15 27 00 -40.6830 144.6900 164.00 94.00 70.00 334031 CGO 2012 01 03 23 33 00 2802-99 G co CCGG 45.180 -999.990 ... V4 2012 04 19 15 42 00 -40.6830 144.6900 164.00 94.00 70.00 334032 CGO 2012 01 07 10 45 00 4029-99 G co CCGG 43.370 -999.990 ... V2 2012 05 09 11 36 00 -40.6830 144.6900 164.00 94.00 70.00 334785 CGO 2012 01 07 10 45 00 4030-99 G co CCGG 41.810 -999.990 ... V2 2012 05 09 11 53 00 -40.6830 144.6900 164.00 94.00 70.00 334786 CGO 2012 01 10 01 00 00 1403-99 G co CCGG 38.560 -999.990 ... V4 2012 04 19 14 56 00 -40.6830 144.6900 164.00 94.00 70.00 334029 CGO 2012 01 10 01 00 00 1404-99 G co CCGG 44.000 -999.990 N.. V4 2012 04 19 15 12 00 -40.6830 144.6900 164.00 94.00 70.00 334030 CGO 2012 02 20 10 44 00 1771-99 G co CCGG 46.660 -999.990 N.. V2 2012 05 09 11 04 00 -40.6830 144.6900 164.00 94.00 70.00 334787 CGO 2012 02 20 10 44 00 1772-99 G co CCGG 43.890 -999.990 ... V2 2012 05 09 11 20 00 -40.6830 144.6900 164.00 94.00 70.00 334788 CGO 2012 03 05 00 11 00 3899-99 G co CCGG 48.190 -999.990 N.. V2 2012 05 22 15 44 00 -40.6830 144.6900 164.00 94.00 70.00 335495 CGO 2012 03 05 00 11 00 3900-99 G co CCGG 41.040 -999.990 ... V2 2012 05 22 16 01 00 -40.6830 144.6900 164.00 94.00 70.00 335496 CGO 2012 03 22 00 05 00 1977-99 G co CCGG 50.250 -999.990 N.. V2 2012 05 22 15 12 00 -40.6830 144.6900 164.00 94.00 70.00 335497 CGO 2012 03 22 00 05 00 1978-99 G co CCGG 40.610 -999.990 ... V2 2012 05 22 15 28 00 -40.6830 144.6900 164.00 94.00 70.00 335498 CGO 2012 04 27 01 31 00 2341-99 G co CCGG 50.160 -999.990 ... V4 2012 10 16 11 42 00 -40.6830 144.6900 164.00 94.00 70.00 342336 CGO 2012 04 27 01 31 00 2342-99 G co CCGG 47.100 -999.990 ... V4 2012 10 16 11 57 00 -40.6830 144.6900 164.00 94.00 70.00 342337 CGO 2012 05 11 00 04 00 1825-99 G co CCGG 47.390 -999.990 ... V4 2012 10 16 12 13 00 -40.6830 144.6900 164.00 94.00 70.00 342338 CGO 2012 05 11 00 04 00 1826-99 G co CCGG 49.110 -999.990 ... V4 2012 10 16 12 28 00 -40.6830 144.6900 164.00 94.00 70.00 342339 CGO 2012 05 28 00 39 00 141-99 G co CCGG 52.260 -999.990 ... V4 2012 10 16 15 16 00 -40.6830 144.6900 164.00 94.00 70.00 342332 CGO 2012 05 28 00 39 00 142-99 G co CCGG 51.060 -999.990 ... V4 2012 10 16 15 31 00 -40.6830 144.6900 164.00 94.00 70.00 342333 CGO 2012 06 07 00 41 00 3571-99 G co CCGG 51.920 -999.990 ... V4 2012 10 16 14 45 00 -40.6830 144.6900 164.00 94.00 70.00 342334 CGO 2012 06 07 00 41 00 3572-99 G co CCGG 50.660 -999.990 ... V4 2012 10 16 15 00 00 -40.6830 144.6900 164.00 94.00 70.00 342335 CGO 2012 06 18 01 18 00 4735-99 G co CCGG 56.070 -999.990 ... V4 2012 11 13 13 15 00 -40.6830 144.6900 164.00 94.00 70.00 343402 CGO 2012 06 18 01 18 00 4736-99 G co CCGG 54.790 -999.990 ... V4 2012 11 13 13 30 00 -40.6830 144.6900 164.00 94.00 70.00 343403 CGO 2012 06 26 02 45 00 4489-99 G co CCGG 54.520 -999.990 ... V4 2012 11 13 12 44 00 -40.6830 144.6900 164.00 94.00 70.00 343400 CGO 2012 06 26 02 45 00 4490-99 G co CCGG 53.220 -999.990 ... V4 2012 11 13 13 00 00 -40.6830 144.6900 164.00 94.00 70.00 343401 CGO 2012 07 04 03 57 00 2769-99 G co CCGG 56.500 -999.990 ... V4 2012 11 09 12 57 00 -40.6830 144.6900 164.00 94.00 70.00 343378 CGO 2012 07 04 03 57 00 2770-99 G co CCGG 54.650 -999.990 ... V4 2012 11 09 13 12 00 -40.6830 144.6900 164.00 94.00 70.00 343379 CGO 2012 07 18 00 32 00 1489-99 G co CCGG 56.580 -999.990 ... V4 2012 11 09 13 27 00 -40.6830 144.6900 164.00 94.00 70.00 343376 CGO 2012 07 18 00 32 00 1490-99 G co CCGG 54.920 -999.990 ... V4 2012 11 09 13 42 00 -40.6830 144.6900 164.00 94.00 70.00 343377 CGO 2012 08 08 01 07 00 1357-99 G co CCGG 58.320 -999.990 ... V4 2012 10 18 16 05 00 -40.6830 144.6900 164.00 94.00 70.00 342532 CGO 2012 08 08 01 07 00 1358-99 G co CCGG 57.640 -999.990 ... V4 2012 10 18 16 20 00 -40.6830 144.6900 164.00 94.00 70.00 342533 CGO 2012 08 15 01 42 00 2635-99 G co CCGG 62.420 -999.990 ... V4 2012 10 18 16 35 00 -40.6830 144.6900 164.00 94.00 70.00 342530 CGO 2012 08 15 01 42 00 2636-99 G co CCGG 59.980 -999.990 ... V4 2012 10 18 16 51 00 -40.6830 144.6900 164.00 94.00 70.00 342531 CGO 2012 08 24 01 33 00 185-99 G co CCGG 58.620 -999.990 ... V4 2012 10 16 13 44 00 -40.6830 144.6900 164.00 94.00 70.00 342330 CGO 2012 08 24 01 33 00 186-99 G co CCGG 58.840 -999.990 ... V4 2012 10 16 13 59 00 -40.6830 144.6900 164.00 94.00 70.00 342331 CGO 2012 08 31 02 09 00 729-99 G co CCGG 59.390 -999.990 ... V4 2012 10 16 14 15 00 -40.6830 144.6900 164.00 94.00 70.00 342328 CGO 2012 08 31 02 09 00 730-99 G co CCGG 59.020 -999.990 ... V4 2012 10 16 14 30 00 -40.6830 144.6900 164.00 94.00 70.00 342329 CGO 2012 09 07 01 43 00 2329-99 G co CCGG 63.790 -999.990 ... V4 2012 11 15 14 02 00 -40.6830 144.6900 164.00 94.00 70.00 343788 CGO 2012 09 07 01 43 00 2330-99 G co CCGG 62.770 -999.990 ... V4 2012 11 15 14 17 00 -40.6830 144.6900 164.00 94.00 70.00 343789 CGO 2012 09 13 03 06 00 2215-99 G co CCGG 62.920 -999.990 ... V4 2012 11 15 15 06 00 -40.6830 144.6900 164.00 94.00 70.00 343786 CGO 2012 09 13 03 06 00 2216-99 G co CCGG 61.380 -999.990 ... V4 2012 11 15 15 21 00 -40.6830 144.6900 164.00 94.00 70.00 343787 CGO 2012 09 28 01 20 00 819-99 G co CCGG 64.850 -999.990 ... V4 2012 11 15 14 36 00 -40.6830 144.6900 164.00 94.00 70.00 343790 CGO 2012 09 28 01 20 00 820-99 G co CCGG 63.770 -999.990 ... V4 2012 11 15 14 51 00 -40.6830 144.6900 164.00 94.00 70.00 343791 CGO 2012 10 05 00 35 00 1059-99 G co CCGG 63.150 -999.990 ... V4 2012 11 15 09 27 00 -40.6830 144.6900 164.00 94.00 70.00 343784 CGO 2012 10 05 00 35 00 1060-99 G co CCGG 61.990 -999.990 ... V4 2012 11 15 09 42 00 -40.6830 144.6900 164.00 94.00 70.00 343785 CGO 2012 10 16 23 25 00 467-99 G co CCGG 64.180 -999.990 ... V2 2013 01 08 15 08 00 -40.6830 144.6900 164.00 94.00 70.00 345467 CGO 2012 10 16 23 25 00 468-99 G co CCGG 63.960 -999.990 ... V2 2013 01 08 15 24 00 -40.6830 144.6900 164.00 94.00 70.00 345468 CGO 2012 10 25 23 45 00 1949-99 G co CCGG 76.370 -999.990 N.. V2 2013 01 08 14 36 00 -40.6830 144.6900 164.00 94.00 70.00 345465 CGO 2012 10 25 23 45 00 1950-99 G co CCGG 61.760 -999.990 ... V2 2013 01 08 14 52 00 -40.6830 144.6900 164.00 94.00 70.00 345466 CGO 2012 11 01 02 29 00 3461-99 G co CCGG 65.280 -999.990 ... V2 2013 01 08 15 41 00 -40.6830 144.6900 164.00 94.00 70.00 345469 CGO 2012 11 01 02 29 00 3462-99 G co CCGG 63.100 -999.990 ... V2 2013 01 08 15 57 00 -40.6830 144.6900 164.00 94.00 70.00 345470 CGO 2012 11 08 00 33 00 2351-99 G co CCGG 53.580 -999.990 N.. V4 2013 01 08 16 41 00 -40.6830 144.6900 164.00 94.00 70.00 345471 CGO 2012 11 08 00 33 00 2352-99 G co CCGG 59.870 -999.990 ... V4 2013 01 08 16 56 00 -40.6830 144.6900 164.00 94.00 70.00 345472 CGO 2012 11 14 23 48 00 2955-99 G co CCGG 60.260 -999.990 ... V4 2013 01 22 14 58 00 -40.6830 144.6900 164.00 94.00 70.00 346299 CGO 2012 11 14 23 48 00 2956-99 G co CCGG 59.040 -999.990 ... V4 2013 01 22 15 13 00 -40.6830 144.6900 164.00 94.00 70.00 346300 CGO 2012 11 21 02 57 00 5183-99 G co CCGG 57.600 -999.990 ... V4 2013 01 22 15 28 00 -40.6830 144.6900 164.00 94.00 70.00 346301 CGO 2012 11 21 02 57 00 5184-99 G co CCGG 56.920 -999.990 ... V4 2013 01 22 15 43 00 -40.6830 144.6900 164.00 94.00 70.00 346302 CGO 2012 12 04 00 10 00 2911-99 G co CCGG 55.820 -999.990 ... V2 2013 03 19 15 04 00 -40.6830 144.6900 164.00 94.00 70.00 348830 CGO 2012 12 04 00 10 00 2912-99 G co CCGG 52.870 -999.990 ... V2 2013 03 19 15 21 00 -40.6830 144.6900 164.00 94.00 70.00 348831 CGO 2012 12 27 23 28 00 3463-99 G co CCGG 47.200 -999.990 ... V2 2013 03 19 14 32 00 -40.6830 144.6900 164.00 94.00 70.00 348828 CGO 2012 12 27 23 28 00 3464-99 G co CCGG 47.020 -999.990 ... V2 2013 03 19 14 48 00 -40.6830 144.6900 164.00 94.00 70.00 348829 CGO 2013 01 09 00 38 00 91-99 G co CCGG 49.180 -999.990 N.. V4 2013 04 02 14 50 00 -40.6830 144.6900 164.00 94.00 70.00 349447 CGO 2013 01 09 00 38 00 92-99 G co CCGG 44.110 -999.990 ... V4 2013 04 02 15 06 00 -40.6830 144.6900 164.00 94.00 70.00 349448 CGO 2013 01 21 23 25 00 2737-99 G co CCGG 47.680 -999.990 N.. V4 2013 04 02 13 46 00 -40.6830 144.6900 164.00 94.00 70.00 349445 CGO 2013 01 21 23 25 00 2738-99 G co CCGG 43.130 -999.990 ... V4 2013 04 02 14 02 00 -40.6830 144.6900 164.00 94.00 70.00 349446 CGO 2013 02 07 02 09 00 1849-99 G co CCGG 44.980 -999.990 ... V4 2013 04 02 14 18 00 -40.6830 144.6900 164.00 94.00 70.00 349449 CGO 2013 02 07 02 09 00 1850-99 G co CCGG 43.490 -999.990 ... V4 2013 04 02 14 34 00 -40.6830 144.6900 164.00 94.00 70.00 349450 CGO 2013 02 19 00 10 00 4419-99 G co CCGG 45.360 -999.990 N.. V4 2013 04 02 15 22 00 -40.6830 144.6900 164.00 94.00 70.00 349451 CGO 2013 02 19 00 10 00 4420-99 G co CCGG 40.940 -999.990 ... V4 2013 04 02 15 38 00 -40.6830 144.6900 164.00 94.00 70.00 349452 CGO 2013 02 26 23 53 00 1885-99 G co CCGG 49.860 -999.990 .X. V4 2013 05 16 14 20 00 -40.6830 144.6900 164.00 94.00 70.00 351345 CGO 2013 02 26 23 53 00 1886-99 G co CCGG 48.160 -999.990 .X. V4 2013 05 16 14 36 00 -40.6830 144.6900 164.00 94.00 70.00 351346 CGO 2013 03 13 23 38 00 2779-99 G co CCGG 45.350 -999.990 ... V4 2013 05 16 13 48 00 -40.6830 144.6900 164.00 94.00 70.00 351347 CGO 2013 03 13 23 38 00 2780-99 G co CCGG 44.490 -999.990 ... V4 2013 05 16 14 04 00 -40.6830 144.6900 164.00 94.00 70.00 351348 CGO 2013 04 02 03 10 00 5007-99 G co CCGG 46.920 -999.990 N.. V4 2013 05 29 15 28 00 -40.6830 144.6900 164.00 94.00 70.00 352190 CGO 2013 04 02 03 10 00 5008-99 G co CCGG 43.300 -999.990 ... V4 2013 05 29 15 44 00 -40.6830 144.6900 164.00 94.00 70.00 352191 CGO 2013 04 10 04 59 00 1101-99 G co CCGG 50.260 -999.990 N.. V2 2013 05 29 16 42 00 -40.6830 144.6900 164.00 94.00 70.00 352188 CGO 2013 04 10 04 59 00 1102-99 G co CCGG 44.470 -999.990 N.. V2 2013 05 29 16 59 00 -40.6830 144.6900 164.00 94.00 70.00 352189 CGO 2013 04 24 03 38 00 4239-99 G co CCGG 44.980 -999.990 ... V2 2013 06 10 12 59 00 -40.6830 144.6900 164.00 94.00 70.00 352891 CGO 2013 04 24 03 38 00 4240-99 G co CCGG 44.070 -999.990 ... V2 2013 06 10 13 15 00 -40.6830 144.6900 164.00 94.00 70.00 352892 CGO 2013 05 01 01 44 00 2423-99 G co CCGG 44.230 -999.990 ... V2 2013 06 10 12 39 00 -40.6830 144.6900 164.00 94.00 70.00 352893 CGO 2013 05 01 01 44 00 2424-99 G co CCGG 46.680 -999.990 ... V2 2013 06 10 12 23 00 -40.6830 144.6900 164.00 94.00 70.00 352894 CGO 2013 05 17 01 07 00 5129-99 G co CCGG 50.970 -999.990 ... V4 2013 08 12 11 36 00 -40.6830 144.6900 164.00 94.00 70.00 355611 CGO 2013 05 17 01 07 00 5130-99 G co CCGG 49.700 -999.990 ... V4 2013 08 12 11 52 00 -40.6830 144.6900 164.00 94.00 70.00 355612 CGO 2013 06 06 23 31 00 2507-99 G co CCGG 148.730 -999.990 A.. V4 2013 08 12 11 04 00 -40.6830 144.6900 164.00 94.00 70.00 355609 CGO 2013 06 06 23 31 00 2508-99 G co CCGG 50.820 -999.990 ... V4 2013 08 12 11 20 00 -40.6830 144.6900 164.00 94.00 70.00 355610 CGO 2013 07 22 01 32 00 3919-99 G co CCGG 56.980 -999.990 ... V4 2013 11 01 13 52 00 -40.6830 144.6900 164.00 94.00 70.00 358715 CGO 2013 07 22 01 32 00 3920-99 G co CCGG 60.180 -999.990 N.. V4 2013 11 01 13 36 00 -40.6830 144.6900 164.00 94.00 70.00 358714 CGO 2013 08 06 00 55 00 3601-99 G co CCGG 60.560 -999.990 ... V4 2013 11 01 14 08 00 -40.6830 144.6900 164.00 94.00 70.00 358718 CGO 2013 08 06 00 55 00 3602-99 G co CCGG 57.660 -999.990 ... V4 2013 11 01 14 24 00 -40.6830 144.6900 164.00 94.00 70.00 358719 CGO 2013 08 12 01 00 00 3947-99 G co CCGG 58.880 -999.990 ... V4 2013 11 01 14 40 00 -40.6830 144.6900 164.00 94.00 70.00 358716 CGO 2013 08 12 01 00 00 3948-99 G co CCGG 58.260 -999.990 ... V4 2013 11 01 14 56 00 -40.6830 144.6900 164.00 94.00 70.00 358717 CGO 2013 08 19 04 01 00 6572-66 G co CCGG 57.980 -999.990 ... V4 2013 11 01 15 12 00 -40.6830 144.6900 164.00 94.00 70.00 358721 CGO 2013 08 26 01 00 00 513-99 G co CCGG 63.460 -999.990 ... V4 2013 11 04 13 49 00 -40.6830 144.6900 164.00 94.00 70.00 358722 CGO 2013 08 26 01 00 00 514-99 G co CCGG 61.860 -999.990 ... V4 2013 11 04 14 05 00 -40.6830 144.6900 164.00 94.00 70.00 358723 CGO 2013 09 05 00 30 00 313-99 G co CCGG 63.620 -999.990 N.. V4 2013 11 04 14 21 00 -40.6830 144.6900 164.00 94.00 70.00 358724 CGO 2013 09 05 00 30 00 314-99 G co CCGG 60.760 -999.990 ... V4 2013 11 04 14 37 00 -40.6830 144.6900 164.00 94.00 70.00 358725 CGO 2013 09 19 01 27 00 1201-99 G co CCGG 63.790 -999.990 N.. V3 2013 11 25 15 44 00 -40.6830 144.6900 164.00 94.00 70.00 360432 CGO 2013 09 19 01 27 00 1202-99 G co CCGG 60.090 -999.990 ... V3 2013 11 25 16 00 00 -40.6830 144.6900 164.00 94.00 70.00 360433 CGO 2013 09 26 06 05 00 4041-99 G co CCGG 60.530 -999.990 ... V3 2013 11 25 16 16 00 -40.6830 144.6900 164.00 94.00 70.00 360434 CGO 2013 09 26 06 05 00 4042-99 G co CCGG 59.170 -999.990 ... V3 2013 11 25 16 32 00 -40.6830 144.6900 164.00 94.00 70.00 360435 CGO 2013 10 03 01 22 00 429-99 G co CCGG 66.130 -999.990 N.. V4 2013 11 26 10 15 00 -40.6830 144.6900 164.00 94.00 70.00 360517 CGO 2013 10 03 01 22 00 430-99 G co CCGG 59.940 -999.990 ... V4 2013 11 26 10 31 00 -40.6830 144.6900 164.00 94.00 70.00 360518 CGO 2013 10 09 23 23 00 1019-99 G co CCGG 63.820 -999.990 N.. V4 2013 11 26 16 07 00 -40.6830 144.6900 164.00 94.00 70.00 360515 CGO 2013 10 09 23 23 00 1020-99 G co CCGG 60.180 -999.990 ... V4 2013 11 26 16 23 00 -40.6830 144.6900 164.00 94.00 70.00 360516 CGO 2013 10 17 00 32 00 815-99 G co CCGG 59.130 -999.990 ... V3 2013 12 04 11 49 00 -40.6830 144.6900 164.00 94.00 70.00 360880 CGO 2013 10 17 00 32 00 816-99 G co CCGG 59.470 -999.990 ... V3 2013 12 04 12 05 00 -40.6830 144.6900 164.00 94.00 70.00 360881 CGO 2013 10 23 23 33 00 2015-99 G co CCGG 59.930 -999.990 ... V3 2013 12 04 11 16 00 -40.6830 144.6900 164.00 94.00 70.00 360878 CGO 2013 10 23 23 33 00 2016-99 G co CCGG 57.140 -999.990 ... V3 2013 12 04 11 33 00 -40.6830 144.6900 164.00 94.00 70.00 360879 CGO 2013 10 30 00 25 00 3819-99 G co CCGG 58.690 -999.990 ... V3 2013 12 20 14 40 00 -40.6830 144.6900 164.00 94.00 70.00 361967 CGO 2013 10 30 00 25 00 3820-99 G co CCGG 57.080 -999.990 ... V3 2013 12 20 14 56 00 -40.6830 144.6900 164.00 94.00 70.00 361968 CGO 2013 11 14 00 50 00 3017-99 G co CCGG 58.710 -999.990 N.. V3 2013 12 20 15 12 00 -40.6830 144.6900 164.00 94.00 70.00 361969 CGO 2013 11 14 00 50 00 3018-99 G co CCGG 55.050 -999.990 ... V3 2013 12 20 15 28 00 -40.6830 144.6900 164.00 94.00 70.00 361970 CGO 2013 11 29 00 49 00 1555-99 G co CCGG 52.040 -999.990 ... V4 2014 01 06 12 50 00 -40.6830 144.6900 164.00 94.00 70.00 362221 CGO 2013 11 29 00 49 00 1556-99 G co CCGG 51.210 -999.990 ... V4 2014 01 06 13 06 00 -40.6830 144.6900 164.00 94.00 70.00 362222 CGO 2013 12 05 02 26 00 751-99 G co CCGG 49.810 -999.990 ... V4 2014 01 06 13 22 00 -40.6830 144.6900 164.00 94.00 70.00 362223 CGO 2013 12 05 02 26 00 752-99 G co CCGG 50.070 -999.990 ... V4 2014 01 06 13 38 00 -40.6830 144.6900 164.00 94.00 70.00 362224 CGO 2013 12 09 23 59 00 3177-99 G co CCGG 48.370 -999.990 ... V3 2014 02 13 12 09 00 -40.6830 144.6900 164.00 94.00 70.00 363697 CGO 2013 12 09 23 59 00 3178-99 G co CCGG 47.390 -999.990 ... V3 2014 02 13 12 25 00 -40.6830 144.6900 164.00 94.00 70.00 363698 CGO 2013 12 22 23 58 00 193-99 G co CCGG 47.150 -999.990 ... V3 2014 02 13 11 37 00 -40.6830 144.6900 164.00 94.00 70.00 363699 CGO 2013 12 22 23 58 00 194-99 G co CCGG 44.720 -999.990 ... V3 2014 02 13 11 53 00 -40.6830 144.6900 164.00 94.00 70.00 363700 CGO 2014 01 01 23 05 00 2195-99 G co CCGG 46.720 -999.990 ... V4 2014 03 11 14 20 00 -40.6830 144.6900 164.00 94.00 70.00 365188 CGO 2014 01 01 23 05 00 2196-99 G co CCGG 44.010 -999.990 ... V4 2014 03 11 14 36 00 -40.6830 144.6900 164.00 94.00 70.00 365189 CGO 2014 01 21 01 46 00 1121-99 G co CCGG 45.050 -999.990 N.. V4 2014 03 11 13 48 00 -40.6830 144.6900 164.00 94.00 70.00 365190 CGO 2014 01 21 01 46 00 1122-99 G co CCGG 41.240 -999.990 ... V4 2014 03 11 14 04 00 -40.6830 144.6900 164.00 94.00 70.00 365191 CGO 2014 02 17 00 01 00 3485-99 G co CCGG 41.580 -999.990 ... V4 2014 04 03 11 33 00 -40.6830 144.6900 164.00 94.00 70.00 365948 CGO 2014 02 17 00 01 00 3486-99 G co CCGG 41.190 -999.990 ... V4 2014 04 03 11 49 00 -40.6830 144.6900 164.00 94.00 70.00 365949 CGO 2014 02 24 01 00 00 705-99 G co CCGG 42.350 -999.990 ... V4 2014 04 03 11 00 00 -40.6830 144.6900 164.00 94.00 70.00 365946 CGO 2014 02 24 01 00 00 706-99 G co CCGG 41.270 -999.990 ... V4 2014 04 03 11 16 00 -40.6830 144.6900 164.00 94.00 70.00 365947 CGO 2014 03 05 01 06 00 3417-99 G co CCGG 40.250 -999.990 ... V4 2014 05 14 13 29 00 -40.6830 144.6900 164.00 94.00 70.00 367494 CGO 2014 03 05 01 06 00 3418-99 G co CCGG 40.060 -999.990 ... V4 2014 05 14 13 45 00 -40.6830 144.6900 164.00 94.00 70.00 367495 CGO 2014 03 11 23 40 00 635-99 G co CCGG 41.860 -999.990 ... V4 2014 05 14 12 57 00 -40.6830 144.6900 164.00 94.00 70.00 367490 CGO 2014 03 11 23 40 00 636-99 G co CCGG 41.400 -999.990 ... V4 2014 05 14 13 13 00 -40.6830 144.6900 164.00 94.00 70.00 367491 CGO 2014 03 17 00 18 00 371-99 G co CCGG 47.420 -999.990 ... V4 2014 05 14 14 33 00 -40.6830 144.6900 164.00 94.00 70.00 367492 CGO 2014 03 17 00 18 00 372-99 G co CCGG 45.390 -999.990 ... V4 2014 05 14 14 49 00 -40.6830 144.6900 164.00 94.00 70.00 367493 CGO 2014 04 02 00 50 00 2993-99 G co CCGG 46.240 -999.990 N.. V4 2014 05 14 14 01 00 -40.6830 144.6900 164.00 94.00 70.00 367496 CGO 2014 04 02 00 50 00 2994-99 G co CCGG 43.280 -999.990 ... V4 2014 05 14 14 17 00 -40.6830 144.6900 164.00 94.00 70.00 367497 CGO 2014 04 22 00 59 00 861-99 G co CCGG 48.210 -999.990 N.. V4 2014 06 23 14 21 00 -40.6830 144.6900 164.00 94.00 70.00 369105 CGO 2014 04 22 00 59 00 862-99 G co CCGG 45.370 -999.990 ... V4 2014 06 23 14 37 00 -40.6830 144.6900 164.00 94.00 70.00 369106 CGO 2014 05 05 01 25 00 3649-99 G co CCGG 48.340 -999.990 ... V4 2014 06 23 14 53 00 -40.6830 144.6900 164.00 94.00 70.00 369103 CGO 2014 05 05 01 25 00 3650-99 G co CCGG 50.130 -999.990 ... V4 2014 06 23 15 09 00 -40.6830 144.6900 164.00 94.00 70.00 369104 CGO 2014 05 23 01 54 00 4759-99 G co CCGG 52.000 -999.990 ... V4 2014 08 08 15 37 00 -40.6830 144.6900 164.00 94.00 70.00 371468 CGO 2014 05 23 01 54 00 4760-99 G co CCGG 50.400 -999.990 ... V4 2014 08 08 15 53 00 -40.6830 144.6900 164.00 94.00 70.00 371469 CGO 2014 05 28 02 08 00 3205-99 G co CCGG 49.490 -999.990 ... V4 2014 08 08 16 09 00 -40.6830 144.6900 164.00 94.00 70.00 371466 CGO 2014 05 28 02 08 00 3206-99 G co CCGG 51.010 -999.990 ... V4 2014 08 08 16 25 00 -40.6830 144.6900 164.00 94.00 70.00 371467 CGO 2014 06 04 04 11 00 4445-99 G co CCGG 53.220 -999.990 N.. V4 2014 08 08 16 41 00 -40.6830 144.6900 164.00 94.00 70.00 371472 CGO 2014 06 04 04 11 00 4446-99 G co CCGG 49.720 -999.990 ... V4 2014 08 08 16 57 00 -40.6830 144.6900 164.00 94.00 70.00 371473 CGO 2014 06 16 02 59 00 1377-99 G co CCGG 55.150 -999.990 ... V4 2014 08 08 17 13 00 -40.6830 144.6900 164.00 94.00 70.00 371470 CGO 2014 06 16 02 59 00 1378-99 G co CCGG 53.400 -999.990 ... V4 2014 08 08 17 29 00 -40.6830 144.6900 164.00 94.00 70.00 371471 CGO 2014 06 30 04 06 00 1823-99 G co CCGG 58.690 -999.990 ... V4 2014 08 13 16 14 00 -40.6830 144.6900 164.00 94.00 70.00 372069 CGO 2014 06 30 04 06 00 1824-99 G co CCGG 57.620 -999.990 ... V4 2014 08 13 16 30 00 -40.6830 144.6900 164.00 94.00 70.00 372070 CGO 2014 07 14 01 01 00 4941-99 G co CCGG 57.840 -999.990 ... V4 2014 08 13 15 42 00 -40.6830 144.6900 164.00 94.00 70.00 372067 CGO 2014 07 14 01 01 00 4942-99 G co CCGG 59.300 -999.990 ... V4 2014 08 13 15 58 00 -40.6830 144.6900 164.00 94.00 70.00 372068 CGO 2014 08 01 00 29 00 5249-99 G co CCGG 58.090 -999.990 ... V4 2014 09 18 11 10 00 -40.6830 144.6900 164.00 94.00 70.00 374222 CGO 2014 08 01 00 29 00 5250-99 G co CCGG 62.220 -999.990 N.. V4 2014 09 18 11 26 00 -40.6830 144.6900 164.00 94.00 70.00 374223 CGO 2014 08 06 04 43 00 4297-99 G co CCGG 60.840 -999.990 ... V4 2014 09 18 11 42 00 -40.6830 144.6900 164.00 94.00 70.00 374224 CGO 2014 08 06 04 43 00 4298-99 G co CCGG 59.550 -999.990 ... V4 2014 09 18 11 58 00 -40.6830 144.6900 164.00 94.00 70.00 374225 CGO 2014 08 12 01 05 00 2247-99 G co CCGG 58.930 -999.990 ... V4 2014 11 18 12 24 00 -40.6830 144.6900 164.00 94.00 70.00 376967 CGO 2014 08 12 01 05 00 2248-99 G co CCGG 61.440 -999.990 ... V4 2014 11 18 12 40 00 -40.6830 144.6900 164.00 94.00 70.00 376968 CGO 2014 09 03 01 25 00 479-99 G co CCGG 61.590 -999.990 ... V4 2014 11 18 12 56 00 -40.6830 144.6900 164.00 94.00 70.00 376965 CGO 2014 09 03 01 25 00 480-99 G co CCGG 60.200 -999.990 ... V4 2014 11 18 13 12 00 -40.6830 144.6900 164.00 94.00 70.00 376966 CGO 2014 09 11 01 53 00 2165-99 G co CCGG 62.620 -999.990 ... V4 2014 11 18 13 28 00 -40.6830 144.6900 164.00 94.00 70.00 376963 CGO 2014 09 11 01 53 00 2166-99 G co CCGG 60.710 -999.990 ... V4 2014 11 18 13 44 00 -40.6830 144.6900 164.00 94.00 70.00 376964 CGO 2014 09 25 00 41 00 393-99 G co CCGG 63.120 -999.990 ... V4 2014 11 18 14 00 00 -40.6830 144.6900 164.00 94.00 70.00 376961 CGO 2014 09 25 00 41 00 394-99 G co CCGG 62.850 -999.990 ... V4 2014 11 18 14 16 00 -40.6830 144.6900 164.00 94.00 70.00 376962 CGO 2014 10 01 01 15 00 1059-99 G co CCGG 59.500 -999.990 ... V4 2014 11 14 15 43 00 -40.6830 144.6900 164.00 94.00 70.00 376958 CGO 2014 10 01 01 15 00 1060-99 G co CCGG 61.720 -999.990 ... V4 2014 11 14 15 59 00 -40.6830 144.6900 164.00 94.00 70.00 376959 CGO 2014 10 07 00 12 00 5037-99 G co CCGG 62.990 -999.990 N.. V4 2014 11 14 16 15 00 -40.6830 144.6900 164.00 94.00 70.00 376956 CGO 2014 10 07 00 12 00 5038-99 G co CCGG 59.230 -999.990 ... V4 2014 11 14 16 31 00 -40.6830 144.6900 164.00 94.00 70.00 376957 CGO 2014 10 27 00 04 00 4729-99 G co CCGG 58.850 -999.990 ... V4 2015 03 24 10 18 00 -40.6830 144.6900 164.00 94.00 70.00 382940 CGO 2014 10 27 00 04 00 4730-99 G co CCGG 61.100 -999.990 ... V4 2015 03 24 10 34 00 -40.6830 144.6900 164.00 94.00 70.00 382941 CGO 2014 11 09 23 46 00 3493-99 G co CCGG 58.700 -999.990 ... V4 2015 03 24 09 46 00 -40.6830 144.6900 164.00 94.00 70.00 382942 CGO 2014 11 09 23 46 00 3494-99 G co CCGG 57.300 -999.990 ... V4 2015 03 24 10 02 00 -40.6830 144.6900 164.00 94.00 70.00 382943 CGO 2014 11 17 00 03 00 1683-99 G co CCGG 55.700 -999.990 -.. V4 2015 03 23 12 44 00 -40.6830 144.6900 164.00 94.00 70.00 382934 CGO 2014 11 17 00 03 00 1684-99 G co CCGG 58.790 -999.990 +.. V4 2015 03 23 13 00 00 -40.6830 144.6900 164.00 94.00 70.00 382935 CGO 2014 11 24 23 41 00 1489-99 G co CCGG 53.700 -999.990 ... V4 2015 03 23 13 16 00 -40.6830 144.6900 164.00 94.00 70.00 382930 CGO 2014 11 24 23 41 00 1490-99 G co CCGG 52.120 -999.990 ... V4 2015 03 23 13 32 00 -40.6830 144.6900 164.00 94.00 70.00 382931 CGO 2014 12 18 23 49 00 5253-99 G co CCGG 48.230 -999.990 N.. V4 2015 03 23 13 47 00 -40.6830 144.6900 164.00 94.00 70.00 382936 CGO 2014 12 18 23 49 00 5254-99 G co CCGG 45.740 -999.990 ... V4 2015 03 23 14 03 00 -40.6830 144.6900 164.00 94.00 70.00 382937 CGO 2014 12 23 22 59 00 121-99 G co CCGG 47.630 -999.990 ... V4 2015 03 23 12 12 00 -40.6830 144.6900 164.00 94.00 70.00 382932 CGO 2014 12 23 22 59 00 122-99 G co CCGG 46.060 -999.990 ... V4 2015 03 23 12 28 00 -40.6830 144.6900 164.00 94.00 70.00 382933 CGO 2014 12 29 23 07 00 1579-99 G co CCGG 50.910 -999.990 N.. V4 2015 03 30 15 34 00 -40.6830 144.6900 164.00 94.00 70.00 383854 CGO 2014 12 29 23 07 00 1580-99 G co CCGG 47.070 -999.990 ... V4 2015 03 30 15 50 00 -40.6830 144.6900 164.00 94.00 70.00 383855 CGO 2015 01 09 00 44 00 373-99 G co CCGG 48.410 -999.990 N.. V4 2015 03 30 16 06 00 -40.6830 144.6900 164.00 94.00 70.00 383852 CGO 2015 01 09 00 44 00 374-99 G co CCGG 44.160 -999.990 ... V4 2015 03 30 16 22 00 -40.6830 144.6900 164.00 94.00 70.00 383853 CGO 2015 02 16 00 39 00 5269-99 G co CCGG 48.820 -999.990 .X. V4 2015 04 01 14 07 00 -40.6830 144.6900 164.00 94.00 70.00 383957 CGO 2015 02 16 00 39 00 5270-99 G co CCGG 47.880 -999.990 .X. V4 2015 04 01 14 23 00 -40.6830 144.6900 164.00 94.00 70.00 383958 CGO 2015 02 23 01 13 00 685-99 G co CCGG 45.070 -999.990 ... V4 2015 04 01 13 35 00 -40.6830 144.6900 164.00 94.00 70.00 383959 CGO 2015 02 23 01 13 00 686-99 G co CCGG 43.320 -999.990 ... V4 2015 04 01 13 51 00 -40.6830 144.6900 164.00 94.00 70.00 383960 CGO 2015 03 03 00 13 00 3923-99 G co CCGG 41.820 -999.990 ... V4 2015 06 02 09 43 00 -40.6830 144.6900 164.00 94.00 70.00 386775 CGO 2015 03 03 00 13 00 3924-99 G co CCGG 40.020 -999.990 ... V4 2015 06 02 09 59 00 -40.6830 144.6900 164.00 94.00 70.00 386776 CGO 2015 03 12 01 14 00 503-99 G co CCGG 41.890 -999.990 ... V4 2015 06 02 10 15 00 -40.6830 144.6900 164.00 94.00 70.00 386777 CGO 2015 03 12 01 14 00 504-99 G co CCGG 42.250 -999.990 ... V4 2015 06 02 10 31 00 -40.6830 144.6900 164.00 94.00 70.00 386778 CGO 2015 03 19 23 58 00 539-99 G co CCGG 43.830 -999.990 ... V4 2015 06 01 12 59 00 -40.6830 144.6900 164.00 94.00 70.00 386753 CGO 2015 03 19 23 58 00 540-99 G co CCGG 40.900 -999.990 ... V4 2015 06 01 13 15 00 -40.6830 144.6900 164.00 94.00 70.00 386754 CGO 2015 03 27 01 45 00 3947-99 G co CCGG 44.810 -999.990 ... V4 2015 06 01 12 27 00 -40.6830 144.6900 164.00 94.00 70.00 386751 CGO 2015 03 27 01 45 00 3948-99 G co CCGG 42.650 -999.990 ... V4 2015 06 01 12 43 00 -40.6830 144.6900 164.00 94.00 70.00 386752 CGO 2015 04 15 23 03 00 565-99 G co CCGG 43.910 -999.990 ... V4 2015 06 08 11 40 00 -40.6830 144.6900 164.00 94.00 70.00 387130 CGO 2015 04 15 23 03 00 566-99 G co CCGG 46.420 -999.990 ... V4 2015 06 08 11 56 00 -40.6830 144.6900 164.00 94.00 70.00 387131 CGO 2015 04 27 01 45 00 3307-99 G co CCGG 50.030 -999.990 N.. V4 2015 06 05 14 06 00 -40.6830 144.6900 164.00 94.00 70.00 387132 CGO 2015 04 27 01 45 00 3308-99 G co CCGG 46.690 -999.990 ... V4 2015 06 05 14 22 00 -40.6830 144.6900 164.00 94.00 70.00 387133 CGO 2015 05 07 01 52 00 4821-99 G co CCGG 47.350 -999.990 ... V4 2015 06 26 14 58 00 -40.6830 144.6900 164.00 94.00 70.00 388218 CGO 2015 05 07 01 52 00 4822-99 G co CCGG 46.370 -999.990 ... V4 2015 06 26 15 14 00 -40.6830 144.6900 164.00 94.00 70.00 388219 CGO 2015 05 13 01 28 00 3339-99 G co CCGG 49.350 -999.990 N.. V4 2015 06 29 12 00 00 -40.6830 144.6900 164.00 94.00 70.00 388216 CGO 2015 05 13 01 28 00 3340-99 G co CCGG 45.880 -999.990 ... V4 2015 06 29 12 16 00 -40.6830 144.6900 164.00 94.00 70.00 388217 CGO 2015 05 29 01 25 00 315-99 G co CCGG 51.700 -999.990 ... V4 2015 09 28 11 11 00 -40.6830 144.6900 164.00 94.00 70.00 394226 CGO 2015 05 29 01 25 00 316-99 G co CCGG 49.510 -999.990 ... V4 2015 09 28 11 27 00 -40.6830 144.6900 164.00 94.00 70.00 394227 CGO 2015 06 09 01 51 00 207-99 G co CCGG 53.190 -999.990 N.. V4 2015 09 28 10 39 00 -40.6830 144.6900 164.00 94.00 70.00 394231 CGO 2015 06 09 01 51 00 208-99 G co CCGG 49.860 -999.990 ... V4 2015 09 28 10 55 00 -40.6830 144.6900 164.00 94.00 70.00 394232 CGO 2015 06 24 04 32 00 1963-99 G co CCGG 56.170 -999.990 N.. V4 2015 09 28 13 18 00 -40.6830 144.6900 164.00 94.00 70.00 394275 CGO 2015 06 24 04 32 00 1964-99 G co CCGG 52.720 -999.990 ... V4 2015 09 28 13 33 00 -40.6830 144.6900 164.00 94.00 70.00 394276 CGO 2015 07 02 02 27 00 1403-99 G co CCGG 55.280 -999.990 ... V4 2015 09 28 12 46 00 -40.6830 144.6900 164.00 94.00 70.00 394273 CGO 2015 07 02 02 27 00 1404-99 G co CCGG 53.900 -999.990 ... V4 2015 09 28 13 02 00 -40.6830 144.6900 164.00 94.00 70.00 394274 CGO 2015 07 13 04 47 00 682-99 G co CCGG 56.930 -999.990 ... V4 2015 09 29 14 49 00 -40.6830 144.6900 164.00 94.00 70.00 394280 CGO 2015 07 27 00 54 00 61-99 G co CCGG 58.550 -999.990 ... V4 2015 09 28 13 49 00 -40.6830 144.6900 164.00 94.00 70.00 394277 CGO 2015 07 27 00 54 00 62-99 G co CCGG 57.810 -999.990 ... V4 2015 09 28 14 05 00 -40.6830 144.6900 164.00 94.00 70.00 394278 CGO 2015 08 03 01 14 00 3861-99 G co CCGG 57.760 -999.990 ... V4 2015 10 16 14 57 00 -40.6830 144.6900 164.00 94.00 70.00 395637 CGO 2015 08 03 01 14 00 3862-99 G co CCGG 56.820 -999.990 ... V4 2015 10 16 15 13 00 -40.6830 144.6900 164.00 94.00 70.00 395638 CGO 2015 08 13 02 15 00 1851-99 G co CCGG 60.470 -999.990 ... V4 2015 10 16 15 29 00 -40.6830 144.6900 164.00 94.00 70.00 395635 CGO 2015 08 13 02 15 00 1852-99 G co CCGG 60.770 -999.990 ... V4 2015 10 16 15 44 00 -40.6830 144.6900 164.00 94.00 70.00 395636 CGO 2015 09 04 00 59 00 5251-99 G co CCGG 62.730 -999.990 N.. V4 2015 10 16 16 00 00 -40.6830 144.6900 164.00 94.00 70.00 395641 CGO 2015 09 04 00 59 00 5252-99 G co CCGG 59.370 -999.990 ... V4 2015 10 16 16 16 00 -40.6830 144.6900 164.00 94.00 70.00 395642 CGO 2015 09 10 01 07 00 3261-99 G co CCGG 64.330 -999.990 ... V4 2015 10 16 16 32 00 -40.6830 144.6900 164.00 94.00 70.00 395639 CGO 2015 09 10 01 07 00 3262-99 G co CCGG 61.750 -999.990 ... V4 2015 10 16 16 48 00 -40.6830 144.6900 164.00 94.00 70.00 395640 CGO 2015 09 16 00 28 00 4281-99 G co CCGG 63.640 -999.990 N.. V4 2015 10 26 10 50 00 -40.6830 144.6900 164.00 94.00 70.00 396293 CGO 2015 09 16 00 28 00 4282-99 G co CCGG 60.090 -999.990 ... V4 2015 10 26 11 06 00 -40.6830 144.6900 164.00 94.00 70.00 396294 CGO 2015 09 22 01 41 00 2195-99 G co CCGG 62.520 -999.990 ... V4 2015 10 26 10 19 00 -40.6830 144.6900 164.00 94.00 70.00 396295 CGO 2015 09 22 01 41 00 2196-99 G co CCGG 60.000 -999.990 ... V4 2015 10 26 10 34 00 -40.6830 144.6900 164.00 94.00 70.00 396296 CGO 2015 10 06 23 37 00 4311-99 G co CCGG 61.090 -999.990 ... V4 2016 01 06 11 11 00 -40.6830 144.6900 164.00 94.00 70.00 399468 CGO 2015 10 06 23 37 00 4312-99 G co CCGG 61.020 -999.990 ... V4 2016 01 06 11 27 00 -40.6830 144.6900 164.00 94.00 70.00 399469 CGO 2015 11 12 23 24 00 867-99 G co CCGG 61.720 -999.990 ... V4 2016 01 06 11 43 00 -40.6830 144.6900 164.00 94.00 70.00 399470 CGO 2015 11 12 23 24 00 868-99 G co CCGG 59.170 -999.990 ... V4 2016 01 06 11 59 00 -40.6830 144.6900 164.00 94.00 70.00 399471 CGO 2015 11 18 00 11 00 3903-99 G co CCGG 65.360 -999.990 ... V4 2016 02 10 16 15 00 -40.6830 144.6900 164.00 94.00 70.00 401618 CGO 2015 11 18 00 11 00 3904-99 G co CCGG 64.120 -999.990 ... V4 2016 02 10 16 30 00 -40.6830 144.6900 164.00 94.00 70.00 401619 CGO 2015 11 25 23 10 00 3711-99 G co CCGG 54.870 -999.990 ... V4 2016 02 10 16 46 00 -40.6830 144.6900 164.00 94.00 70.00 401616 CGO 2015 11 25 23 10 00 3712-99 G co CCGG 54.130 -999.990 ... V4 2016 02 10 17 02 00 -40.6830 144.6900 164.00 94.00 70.00 401617 CGO 2015 12 01 23 43 00 261-99 G co CCGG 58.140 -999.990 N.. V4 2016 02 11 09 06 00 -40.6830 144.6900 164.00 94.00 70.00 401620 CGO 2015 12 01 23 43 00 262-99 G co CCGG 54.570 -999.990 ... V4 2016 02 11 09 22 00 -40.6830 144.6900 164.00 94.00 70.00 401621 CGO 2015 12 09 01 35 00 3357-99 G co CCGG 58.520 -999.990 ... V4 2016 02 11 09 38 00 -40.6830 144.6900 164.00 94.00 70.00 401622 CGO 2015 12 09 01 35 00 3358-99 G co CCGG 56.300 -999.990 ... V4 2016 02 11 09 54 00 -40.6830 144.6900 164.00 94.00 70.00 401623 CGO 2015 12 20 23 28 00 1679-99 G co CCGG 52.540 -999.990 ... V4 2016 02 17 09 00 00 -40.6830 144.6900 164.00 94.00 70.00 402185 CGO 2015 12 20 23 28 00 1680-99 G co CCGG 50.220 -999.990 ... V4 2016 02 17 09 16 00 -40.6830 144.6900 164.00 94.00 70.00 402186 CGO 2015 12 29 00 32 00 6061-66 G co CCGG 54.420 -999.990 N.. V4 2016 02 17 09 32 00 -40.6830 144.6900 164.00 94.00 70.00 402183 CGO 2015 12 29 00 32 00 6062-66 G co CCGG 49.120 -999.990 ... V4 2016 02 17 09 48 00 -40.6830 144.6900 164.00 94.00 70.00 402184 CGO 2016 01 07 23 48 00 3403-99 G co CCGG 52.180 -999.990 ... V4 2016 02 17 10 03 00 -40.6830 144.6900 164.00 94.00 70.00 402189 CGO 2016 01 07 23 48 00 3404-99 G co CCGG 49.230 -999.990 ... V4 2016 02 17 10 19 00 -40.6830 144.6900 164.00 94.00 70.00 402190 CGO 2016 01 14 04 09 00 2065-99 G co CCGG 47.530 -999.990 ... V4 2016 02 17 10 35 00 -40.6830 144.6900 164.00 94.00 70.00 402187 CGO 2016 01 14 04 09 00 2066-99 G co CCGG 45.410 -999.990 ... V4 2016 02 17 10 51 00 -40.6830 144.6900 164.00 94.00 70.00 402188 CGO 2016 01 20 02 38 00 49-99 G co CCGG 51.040 -999.990 N.. V4 2016 03 09 13 49 00 -40.6830 144.6900 164.00 94.00 70.00 403252 CGO 2016 01 20 02 38 00 50-99 G co CCGG 47.870 -999.990 ... V4 2016 03 09 14 05 00 -40.6830 144.6900 164.00 94.00 70.00 403253 CGO 2016 02 08 00 19 00 371-99 G co CCGG 50.210 -999.990 N.. V4 2016 03 09 13 17 00 -40.6830 144.6900 164.00 94.00 70.00 403254 CGO 2016 02 08 00 19 00 372-99 G co CCGG 47.040 -999.990 ... V4 2016 03 09 13 33 00 -40.6830 144.6900 164.00 94.00 70.00 403255 CGO 2016 02 15 23 52 00 1849-99 G co CCGG 47.000 -999.990 N.. V4 2016 03 28 14 48 00 -40.6830 144.6900 164.00 94.00 70.00 404196 CGO 2016 02 15 23 52 00 1850-99 G co CCGG 43.240 -999.990 ... V4 2016 03 28 15 04 00 -40.6830 144.6900 164.00 94.00 70.00 404197 CGO 2016 02 26 09 56 00 4811-99 G co CCGG 45.220 -999.990 ... V4 2016 03 28 15 19 00 -40.6830 144.6900 164.00 94.00 70.00 404198 CGO 2016 02 26 09 56 00 4812-99 G co CCGG 48.800 -999.990 N.. V4 2016 03 28 15 35 00 -40.6830 144.6900 164.00 94.00 70.00 404199 CGO 2016 03 07 01 30 00 1453-99 G co CCGG 48.560 -999.990 ... V4 2016 06 17 15 47 00 -40.6830 144.6900 164.00 94.00 70.00 408706 CGO 2016 03 07 01 30 00 1454-99 G co CCGG 46.790 -999.990 ... V4 2016 06 17 16 03 00 -40.6830 144.6900 164.00 94.00 70.00 408707 CGO 2016 03 18 03 59 00 1229-99 G co CCGG 45.940 -999.990 ... V4 2016 06 17 15 16 00 -40.6830 144.6900 164.00 94.00 70.00 408704 CGO 2016 03 18 03 59 00 1230-99 G co CCGG 44.180 -999.990 ... V4 2016 06 17 15 31 00 -40.6830 144.6900 164.00 94.00 70.00 408705 CGO 2016 03 24 03 59 00 1713-99 G co CCGG 49.330 -999.990 +.. V4 2016 06 20 16 41 00 -40.6830 144.6900 164.00 94.00 70.00 408684 CGO 2016 03 24 03 59 00 1714-99 G co CCGG 45.840 -999.990 ... V4 2016 06 20 16 57 00 -40.6830 144.6900 164.00 94.00 70.00 408685 CGO 2016 04 07 00 58 00 4085-99 G co CCGG 51.410 -999.990 N.. V4 2016 06 20 16 10 00 -40.6830 144.6900 164.00 94.00 70.00 408686 CGO 2016 04 07 00 58 00 4086-99 G co CCGG 46.940 -999.990 ... V4 2016 06 20 16 25 00 -40.6830 144.6900 164.00 94.00 70.00 408687 CGO 2016 04 22 00 24 00 2215-99 G co CCGG 51.170 -999.990 ... V4 2016 06 21 12 28 00 -40.6830 144.6900 164.00 94.00 70.00 408812 CGO 2016 04 22 00 24 00 2216-99 G co CCGG 49.600 -999.990 ... V4 2016 06 21 12 44 00 -40.6830 144.6900 164.00 94.00 70.00 408813 CGO 2016 05 04 01 10 00 2805-99 G co CCGG 51.700 -999.990 ... V4 2016 06 21 11 56 00 -40.6830 144.6900 164.00 94.00 70.00 408814 CGO 2016 05 04 01 10 00 2806-99 G co CCGG 49.490 -999.990 ... V4 2016 06 21 12 12 00 -40.6830 144.6900 164.00 94.00 70.00 408815 CGO 2016 05 10 01 03 00 103-99 G co CCGG 51.760 -999.990 ... V4 2016 07 07 10 03 00 -40.6830 144.6900 164.00 94.00 70.00 409600 CGO 2016 05 10 01 03 00 104-99 G co CCGG 50.400 -999.990 ... V4 2016 07 07 10 19 00 -40.6830 144.6900 164.00 94.00 70.00 409601 CGO 2016 05 19 00 50 00 2121-99 G co CCGG 65.800 -999.990 N.. V4 2016 07 07 09 31 00 -40.6830 144.6900 164.00 94.00 70.00 409599 CGO 2016 05 19 00 50 00 2122-99 G co CCGG 57.660 -999.990 ... V4 2016 07 07 09 47 00 -40.6830 144.6900 164.00 94.00 70.00 409598 CGO 2016 06 10 01 13 00 343-99 G co CCGG 61.410 -999.990 N.. V4 2016 08 01 14 03 00 -40.6830 144.6900 164.00 94.00 70.00 411290 CGO 2016 06 10 01 13 00 344-99 G co CCGG 56.050 -999.990 ... V4 2016 08 01 14 19 00 -40.6830 144.6900 164.00 94.00 70.00 411291 CGO 2016 06 22 01 47 00 141-99 G co CCGG 58.090 -999.990 ... V4 2016 08 01 13 32 00 -40.6830 144.6900 164.00 94.00 70.00 411288 CGO 2016 06 22 01 47 00 142-99 G co CCGG 56.980 -999.990 ... V4 2016 08 01 13 48 00 -40.6830 144.6900 164.00 94.00 70.00 411289 CGO 2016 06 30 23 14 00 3493-99 G co CCGG 58.360 -999.990 ... V4 2016 08 17 11 34 00 -40.6830 144.6900 164.00 94.00 70.00 412356 CGO 2016 06 30 23 14 00 3494-99 G co CCGG 56.520 -999.990 ... V4 2016 08 17 11 50 00 -40.6830 144.6900 164.00 94.00 70.00 412357 CGO 2016 07 14 03 41 00 5303-99 G co CCGG 57.990 -999.990 ... V4 2016 08 17 11 03 00 -40.6830 144.6900 164.00 94.00 70.00 412358 CGO 2016 07 14 03 41 00 5304-99 G co CCGG 59.560 -999.990 ... V4 2016 08 17 11 19 00 -40.6830 144.6900 164.00 94.00 70.00 412359 CGO 2016 07 22 03 38 00 3551-99 G co CCGG 60.760 -999.990 ... V4 2016 08 17 08 56 00 -40.6830 144.6900 164.00 94.00 70.00 412206 CGO 2016 07 22 03 38 00 3552-99 G co CCGG 59.390 -999.990 ... V4 2016 08 17 09 12 00 -40.6830 144.6900 164.00 94.00 70.00 412207 CGO 2016 07 27 03 38 00 2689-99 G co CCGG 59.380 -999.990 ... V4 2016 08 16 16 35 00 -40.6830 144.6900 164.00 94.00 70.00 412208 CGO 2016 07 27 03 38 00 2690-99 G co CCGG 59.380 -999.990 ... V4 2016 08 16 16 50 00 -40.6830 144.6900 164.00 94.00 70.00 412209 CGO 2016 08 02 00 53 00 373-99 G co CCGG 59.560 -999.990 ... V4 2016 09 22 12 03 00 -40.6830 144.6900 164.00 94.00 70.00 413766 CGO 2016 08 02 00 53 00 374-99 G co CCGG 60.620 -999.990 ... V4 2016 09 22 12 19 00 -40.6830 144.6900 164.00 94.00 70.00 413767 CGO 2016 08 11 00 46 00 4999-99 G co CCGG 61.140 -999.990 ... V4 2016 09 22 11 31 00 -40.6830 144.6900 164.00 94.00 70.00 413768 CGO 2016 08 11 00 46 00 5000-99 G co CCGG 59.320 -999.990 ... V4 2016 09 22 11 46 00 -40.6830 144.6900 164.00 94.00 70.00 413769 CGO 2016 08 22 01 00 00 367-99 G co CCGG 63.920 -999.990 N.. V4 2016 10 05 08 31 00 -40.6830 144.6900 164.00 94.00 70.00 414670 CGO 2016 08 22 01 00 00 368-99 G co CCGG 60.170 -999.990 ... V4 2016 10 05 08 47 00 -40.6830 144.6900 164.00 94.00 70.00 414671 CGO 2016 09 01 03 50 00 2049-99 G co CCGG 66.350 -999.990 ... V4 2016 10 05 09 03 00 -40.6830 144.6900 164.00 94.00 70.00 414672 CGO 2016 09 01 03 50 00 2050-99 G co CCGG 64.510 -999.990 ... V4 2016 10 05 09 19 00 -40.6830 144.6900 164.00 94.00 70.00 414673 CGO 2016 09 15 04 40 00 3981-99 G co CCGG 63.400 -999.990 ... V4 2016 10 26 16 14 00 -40.6830 144.6900 164.00 94.00 70.00 415522 CGO 2016 09 15 04 40 00 3982-99 G co CCGG 62.380 -999.990 ... V4 2016 10 26 16 30 00 -40.6830 144.6900 164.00 94.00 70.00 415523 CGO 2016 09 22 01 58 00 2861-99 G co CCGG 65.000 -999.990 ... V4 2016 10 26 16 46 00 -40.6830 144.6900 164.00 94.00 70.00 415524 CGO 2016 09 22 01 58 00 2862-99 G co CCGG 62.000 -999.990 ... V4 2016 10 26 17 02 00 -40.6830 144.6900 164.00 94.00 70.00 415525 CGO 2016 10 04 01 49 00 5169-99 G co CCGG 67.460 -999.990 ... V4 2016 11 10 15 07 00 -40.6830 144.6900 164.00 94.00 70.00 416300 CGO 2016 10 04 01 49 00 5170-99 G co CCGG 66.160 -999.990 ... V4 2016 11 10 15 23 00 -40.6830 144.6900 164.00 94.00 70.00 416301 CGO 2016 10 10 00 47 00 3149-99 G co CCGG 64.530 -999.990 ... V4 2016 11 10 14 35 00 -40.6830 144.6900 164.00 94.00 70.00 416298 CGO 2016 10 10 00 47 00 3150-99 G co CCGG 63.030 -999.990 ... V4 2016 11 10 14 51 00 -40.6830 144.6900 164.00 94.00 70.00 416299 CGO 2016 10 17 00 32 00 1885-99 G co CCGG 62.990 -999.990 ... V4 2016 11 21 16 02 00 -40.6830 144.6900 164.00 94.00 70.00 417087 CGO 2016 10 17 00 32 00 1886-99 G co CCGG 62.360 -999.990 ... V4 2016 11 21 16 18 00 -40.6830 144.6900 164.00 94.00 70.00 417088 CGO 2016 10 26 00 29 00 563-99 G co CCGG 60.960 -999.990 ... V4 2016 11 21 16 34 00 -40.6830 144.6900 164.00 94.00 70.00 417089 CGO 2016 10 26 00 29 00 564-99 G co CCGG 61.890 -999.990 ... V4 2016 11 21 16 50 00 -40.6830 144.6900 164.00 94.00 70.00 417090 CGO 2016 11 01 23 45 00 3403-99 G co CCGG 62.090 -999.990 ... V4 2017 01 11 13 10 00 -40.6830 144.6900 164.00 94.00 70.00 418786 CGO 2016 11 01 23 45 00 3404-99 G co CCGG 59.770 -999.990 ... V4 2017 01 11 13 26 00 -40.6830 144.6900 164.00 94.00 70.00 418787 CGO 2016 11 15 00 37 00 5469-99 G co CCGG 56.780 -999.990 ... V4 2017 01 11 12 39 00 -40.6830 144.6900 164.00 94.00 70.00 418784 CGO 2016 11 15 00 37 00 5470-99 G co CCGG 57.990 -999.990 ... V4 2017 01 11 12 55 00 -40.6830 144.6900 164.00 94.00 70.00 418785 CGO 2016 11 25 00 03 00 2619-99 G co CCGG 55.490 -999.990 ... V4 2017 02 15 10 50 00 -40.6830 144.6900 164.00 94.00 70.00 420663 CGO 2016 11 25 00 03 00 2620-99 G co CCGG 53.060 -999.990 ... V4 2017 02 15 11 06 00 -40.6830 144.6900 164.00 94.00 70.00 420664 CGO 2016 12 08 23 18 00 2975-99 G co CCGG 51.720 -999.990 ... V4 2017 02 15 10 19 00 -40.6830 144.6900 164.00 94.00 70.00 420659 CGO 2016 12 08 23 18 00 2976-99 G co CCGG 49.570 -999.990 ... V4 2017 02 15 10 35 00 -40.6830 144.6900 164.00 94.00 70.00 420660 CGO 2016 12 15 01 33 00 5565-99 G co CCGG 50.280 -999.990 ... V4 2017 02 15 11 22 00 -40.6830 144.6900 164.00 94.00 70.00 420665 CGO 2016 12 15 01 33 00 5566-99 G co CCGG 48.450 -999.990 ... V4 2017 02 15 11 38 00 -40.6830 144.6900 164.00 94.00 70.00 420666 CGO 2016 12 20 23 46 00 5675-99 G co CCGG 47.680 -999.990 ... V4 2017 02 15 11 54 00 -40.6830 144.6900 164.00 94.00 70.00 420661 CGO 2016 12 20 23 46 00 5676-99 G co CCGG 50.900 -999.990 N.. V4 2017 02 15 12 10 00 -40.6830 144.6900 164.00 94.00 70.00 420662 CGO 2017 01 12 00 24 00 355-99 G co CCGG 46.450 -999.990 ... V4 2017 03 27 14 56 00 -40.6830 144.6900 164.00 94.00 70.00 422681 CGO 2017 01 12 00 24 00 356-99 G co CCGG 45.030 -999.990 ... V4 2017 03 27 15 12 00 -40.6830 144.6900 164.00 94.00 70.00 422682 CGO 2017 01 17 23 42 00 5509-99 G co CCGG 43.140 -999.990 ... V4 2017 03 29 14 25 00 -40.6830 144.6900 164.00 94.00 70.00 422895 CGO 2017 01 17 23 42 00 5510-99 G co CCGG 44.550 -999.990 ... V4 2017 03 29 14 41 00 -40.6830 144.6900 164.00 94.00 70.00 422896 CGO 2017 02 05 23 52 00 3721-99 G co CCGG 40.080 -999.990 ... V4 2017 04 04 17 55 00 -40.6830 144.6900 164.00 94.00 70.00 423159 CGO 2017 02 05 23 52 00 530-99 G co CCGG 41.650 -999.990 ... V4 2017 04 04 18 10 00 -40.6830 144.6900 164.00 94.00 70.00 423160 CGO 2017 02 16 23 07 00 1048-99 G co CCGG 43.180 -999.990 ... V4 2017 04 04 14 28 00 -40.6830 144.6900 164.00 94.00 70.00 423157 CGO 2017 02 16 23 07 00 334-99 G co CCGG 44.180 -999.990 ... V4 2017 04 04 14 12 00 -40.6830 144.6900 164.00 94.00 70.00 423158 CGO 2017 02 22 23 36 00 3461-99 G co CCGG 45.450 -999.990 ... V4 2017 04 11 13 10 00 -40.6830 144.6900 164.00 94.00 70.00 423468 CGO 2017 02 22 23 36 00 3462-99 G co CCGG 44.090 -999.990 ... V4 2017 04 11 13 26 00 -40.6830 144.6900 164.00 94.00 70.00 423467 CGO 2017 03 02 23 20 00 3775-99 G co CCGG 53.670 -999.990 N.. V4 2017 04 11 13 42 00 -40.6830 144.6900 164.00 94.00 70.00 423465 CGO 2017 03 02 23 20 00 3776-99 G co CCGG 54.220 -999.990 N.. V4 2017 04 11 13 58 00 -40.6830 144.6900 164.00 94.00 70.00 423466 CGO 2017 03 10 00 03 00 4417-99 G co CCGG 51.430 -999.990 N.. V4 2017 05 03 14 26 00 -40.6830 144.6900 164.00 94.00 70.00 424563 CGO 2017 03 10 00 03 00 4418-99 G co CCGG 46.480 -999.990 ... V4 2017 05 03 14 42 00 -40.6830 144.6900 164.00 94.00 70.00 424564 CGO 2017 03 17 01 13 00 43-99 G co CCGG 48.250 -999.990 N.. V4 2017 05 03 14 58 00 -40.6830 144.6900 164.00 94.00 70.00 424565 CGO 2017 03 17 01 13 00 44-99 G co CCGG 44.460 -999.990 ... V4 2017 05 03 15 14 00 -40.6830 144.6900 164.00 94.00 70.00 424566 CGO 2017 03 24 01 10 00 5163-99 G co CCGG 46.540 -999.990 ... V4 2017 05 11 15 54 00 -40.6830 144.6900 164.00 94.00 70.00 424970 CGO 2017 03 24 01 10 00 5164-99 G co CCGG 45.070 -999.990 ... V4 2017 05 11 16 10 00 -40.6830 144.6900 164.00 94.00 70.00 424971 CGO 2017 03 30 00 21 00 3251-99 G co CCGG 42.190 -999.990 ... V4 2017 05 11 15 23 00 -40.6830 144.6900 164.00 94.00 70.00 424968 CGO 2017 03 30 00 21 00 3252-99 G co CCGG 41.420 -999.990 ... V4 2017 05 11 15 39 00 -40.6830 144.6900 164.00 94.00 70.00 424969 CGO 2017 04 07 04 05 00 4137-99 G co CCGG 120.270 -999.990 .X. V4 2017 05 11 12 08 00 -40.6830 144.6900 164.00 94.00 70.00 424964 CGO 2017 04 07 04 05 00 4138-99 G co CCGG 119.470 -999.990 .X. V4 2017 05 11 12 24 00 -40.6830 144.6900 164.00 94.00 70.00 424965 CGO 2017 04 10 01 15 00 381-99 G co CCGG 46.140 -999.990 ... V4 2017 05 11 13 46 00 -40.6830 144.6900 164.00 94.00 70.00 424966 CGO 2017 04 10 01 15 00 382-99 G co CCGG 43.580 -999.990 ... V4 2017 05 11 14 02 00 -40.6830 144.6900 164.00 94.00 70.00 424967 CGO 2017 04 20 04 51 00 2923-99 G co CCGG 119.060 -999.990 .X. V4 2017 05 22 16 05 00 -40.6830 144.6900 164.00 94.00 70.00 425677 CGO 2017 04 20 04 51 00 2924-99 G co CCGG 115.800 -999.990 .X. V4 2017 05 22 16 21 00 -40.6830 144.6900 164.00 94.00 70.00 425678 CGO 2017 04 26 00 59 00 4181-99 G co CCGG 47.620 -999.990 ... V4 2017 05 22 15 33 00 -40.6830 144.6900 164.00 94.00 70.00 425679 CGO 2017 04 26 00 59 00 4182-99 G co CCGG 45.120 -999.990 ... V4 2017 05 22 15 49 00 -40.6830 144.6900 164.00 94.00 70.00 425680 CGO 2017 05 02 01 54 00 1745-99 G co CCGG 46.990 -999.990 ... V2 2017 07 12 13 51 00 -40.6830 144.6900 164.00 94.00 70.00 427461 CGO 2017 05 02 01 54 00 1746-99 G co CCGG 46.730 -999.990 ... V2 2017 07 12 14 07 00 -40.6830 144.6900 164.00 94.00 70.00 427462 CGO 2017 05 12 02 33 00 5647-99 G co CCGG 132.040 -999.990 .X. V2 2017 07 12 13 19 00 -40.6830 144.6900 164.00 94.00 70.00 427463 CGO 2017 05 12 02 33 00 5648-99 G co CCGG 132.670 -999.990 .X. V2 2017 07 12 13 35 00 -40.6830 144.6900 164.00 94.00 70.00 427464 CGO 2017 05 26 05 10 00 723-99 G co CCGG 51.340 -999.990 ... V2 2017 07 12 14 54 00 -40.6830 144.6900 164.00 94.00 70.00 427467 CGO 2017 05 26 05 10 00 724-99 G co CCGG 50.160 -999.990 ... V2 2017 07 12 15 10 00 -40.6830 144.6900 164.00 94.00 70.00 427468 CGO 2017 05 29 00 47 00 3421-99 G co CCGG 51.860 -999.990 ... V2 2017 07 12 14 22 00 -40.6830 144.6900 164.00 94.00 70.00 427465 CGO 2017 05 29 00 47 00 3422-99 G co CCGG 49.520 -999.990 ... V2 2017 07 12 14 38 00 -40.6830 144.6900 164.00 94.00 70.00 427466 CGO 2017 06 09 02 21 00 1797-99 G co CCGG 56.690 -999.990 ... V2 2017 08 15 16 56 00 -40.6830 144.6900 164.00 94.00 70.00 429121 CGO 2017 06 09 02 21 00 1798-99 G co CCGG 55.000 -999.990 ... V2 2017 08 15 17 11 00 -40.6830 144.6900 164.00 94.00 70.00 429122 CGO 2017 06 16 04 11 00 3629-99 G co CCGG 59.210 -999.990 N.. V2 2017 08 15 16 24 00 -40.6830 144.6900 164.00 94.00 70.00 429123 CGO 2017 06 16 04 11 00 3630-99 G co CCGG 63.840 -999.990 N.. V2 2017 08 15 16 40 00 -40.6830 144.6900 164.00 94.00 70.00 429124 CGO 2017 06 21 02 23 00 4981-99 G co CCGG 53.390 -999.990 ... V2 2017 08 11 16 13 00 -40.6830 144.6900 164.00 94.00 70.00 429272 CGO 2017 06 21 02 23 00 4982-99 G co CCGG 52.120 -999.990 ... V2 2017 08 11 16 29 00 -40.6830 144.6900 164.00 94.00 70.00 429273 CGO 2017 06 26 01 30 00 595-99 G co CCGG 53.240 -999.990 ... V2 2017 08 11 15 41 00 -40.6830 144.6900 164.00 94.00 70.00 429270 CGO 2017 06 26 01 30 00 596-99 G co CCGG 56.160 -999.990 ... V2 2017 08 11 15 57 00 -40.6830 144.6900 164.00 94.00 70.00 429271 CGO 2017 07 06 01 23 00 5129-99 G co CCGG 57.280 -999.990 ... V2 2017 09 08 13 56 00 -40.6830 144.6900 164.00 94.00 70.00 429964 CGO 2017 07 06 01 23 00 5130-99 G co CCGG 55.570 -999.990 ... V2 2017 09 08 14 12 00 -40.6830 144.6900 164.00 94.00 70.00 429965 CGO 2017 07 14 01 12 00 2159-99 G co CCGG 56.070 -999.990 ... V2 2017 09 08 13 25 00 -40.6830 144.6900 164.00 94.00 70.00 429968 CGO 2017 07 14 01 12 00 2160-99 G co CCGG 57.770 -999.990 ... V2 2017 09 08 13 41 00 -40.6830 144.6900 164.00 94.00 70.00 429969 CGO 2017 07 21 01 46 00 5635-99 G co CCGG 59.310 -999.990 ... V2 2017 09 08 15 01 00 -40.6830 144.6900 164.00 94.00 70.00 429966 CGO 2017 07 21 01 46 00 5636-99 G co CCGG 58.360 -999.990 ... V2 2017 09 08 15 17 00 -40.6830 144.6900 164.00 94.00 70.00 429967 CGO 2017 07 24 01 12 00 5681-99 G co CCGG 57.100 -999.990 ... V2 2017 09 08 14 29 00 -40.6830 144.6900 164.00 94.00 70.00 429970 CGO 2017 07 24 01 12 00 5682-99 G co CCGG 58.530 -999.990 ... V2 2017 09 08 14 45 00 -40.6830 144.6900 164.00 94.00 70.00 429971 CGO 2017 08 04 01 36 00 5627-99 G co CCGG 67.760 -999.990 .X. V2 2017 09 12 13 46 00 -40.6830 144.6900 164.00 94.00 70.00 430341 CGO 2017 08 04 01 36 00 5628-99 G co CCGG 66.890 -999.990 .X. V2 2017 09 12 14 02 00 -40.6830 144.6900 164.00 94.00 70.00 430342 CGO 2017 08 08 00 35 00 5621-99 G co CCGG 59.410 -999.990 ... V2 2017 09 12 13 14 00 -40.6830 144.6900 164.00 94.00 70.00 430343 CGO 2017 08 08 00 35 00 5622-99 G co CCGG 62.270 -999.990 ... V2 2017 09 12 13 30 00 -40.6830 144.6900 164.00 94.00 70.00 430344 CGO 2017 08 18 03 21 00 5411-99 G co CCGG 59.080 -999.990 ... V2 2017 10 18 14 22 00 -40.6830 144.6900 164.00 94.00 70.00 432509 CGO 2017 08 18 03 21 00 5412-99 G co CCGG 60.380 -999.990 ... V2 2017 10 18 14 38 00 -40.6830 144.6900 164.00 94.00 70.00 432510 CGO 2017 08 25 02 14 00 777-99 G co CCGG 62.350 -999.990 ... V2 2017 10 18 13 51 00 -40.6830 144.6900 164.00 94.00 70.00 432507 CGO 2017 08 25 02 14 00 778-99 G co CCGG 61.230 -999.990 ... V2 2017 10 18 14 06 00 -40.6830 144.6900 164.00 94.00 70.00 432508 CGO 2017 09 01 04 49 00 4191-99 G co CCGG 62.390 -999.990 ... V2 2017 10 30 14 41 00 -40.6830 144.6900 164.00 94.00 70.00 432969 CGO 2017 09 01 04 49 00 4192-99 G co CCGG 60.290 -999.990 ... V2 2017 10 30 14 57 00 -40.6830 144.6900 164.00 94.00 70.00 432970 CGO 2017 09 04 01 32 00 511-99 G co CCGG 60.650 -999.990 ... V2 2017 10 30 14 10 00 -40.6830 144.6900 164.00 94.00 70.00 432959 CGO 2017 09 04 01 32 00 512-99 G co CCGG 63.120 -999.990 ... V2 2017 10 30 14 25 00 -40.6830 144.6900 164.00 94.00 70.00 432960 CGO 2017 09 14 04 48 00 5037-99 G co CCGG 66.950 -999.990 ... V2 2017 10 30 11 31 00 -40.6830 144.6900 164.00 94.00 70.00 432955 CGO 2017 09 14 04 48 00 5038-99 G co CCGG 64.570 -999.990 ... V2 2017 10 30 11 47 00 -40.6830 144.6900 164.00 94.00 70.00 432956 CGO 2017 09 22 03 52 00 685-99 G co CCGG 61.910 -999.990 ... V2 2017 10 30 13 38 00 -40.6830 144.6900 164.00 94.00 70.00 432957 CGO 2017 09 22 03 52 00 686-99 G co CCGG 64.280 -999.990 ... V2 2017 10 30 13 54 00 -40.6830 144.6900 164.00 94.00 70.00 432958 CGO 2017 09 28 12 03 00 3837-99 G co CCGG 63.070 -999.990 ... V2 2017 11 20 09 46 00 -40.6830 144.6900 164.00 94.00 70.00 434343 CGO 2017 09 28 12 03 00 3838-99 G co CCGG 61.060 -999.990 ... V2 2017 11 20 10 02 00 -40.6830 144.6900 164.00 94.00 70.00 434344 CGO 2017 10 06 00 55 00 5367-99 G co CCGG 62.050 -999.990 ... V2 2017 11 20 10 18 00 -40.6830 144.6900 164.00 94.00 70.00 434345 CGO 2017 10 06 00 55 00 5368-99 G co CCGG 63.850 -999.990 ... V2 2017 11 20 10 34 00 -40.6830 144.6900 164.00 94.00 70.00 434346 CGO 2017 10 13 12 37 00 4059-99 G co CCGG 67.410 -999.990 P.. V2 2017 11 17 16 51 00 -40.6830 144.6900 164.00 94.00 70.00 434339 CGO 2017 10 13 12 37 00 4060-99 G co CCGG 63.710 -999.990 P.. V2 2017 11 17 17 07 00 -40.6830 144.6900 164.00 94.00 70.00 434340 CGO 2017 10 19 23 18 00 119-99 G co CCGG 60.970 -999.990 P.. V2 2017 11 17 17 23 00 -40.6830 144.6900 164.00 94.00 70.00 434341 CGO 2017 10 19 23 18 00 120-99 G co CCGG 65.810 -999.990 P.. V2 2017 11 17 17 39 00 -40.6830 144.6900 164.00 94.00 70.00 434342 CGO 2017 10 27 03 14 00 2999-99 G co CCGG 70.160 -999.990 ... V2 2017 12 18 11 34 00 -40.6830 144.6900 164.00 94.00 70.00 435413 CGO 2017 10 27 03 14 00 3179-99 G co CCGG 70.490 -999.990 ... V2 2017 12 18 11 18 00 -40.6830 144.6900 164.00 94.00 70.00 435412 CGO 2017 11 01 23 23 00 1017-99 G co CCGG 60.730 -999.990 ... V2 2017 12 18 10 30 00 -40.6830 144.6900 164.00 94.00 70.00 435415 CGO 2017 11 01 23 23 00 4051-99 G co CCGG 63.730 -999.990 ... V2 2017 12 18 10 14 00 -40.6830 144.6900 164.00 94.00 70.00 435414 CGO 2017 11 10 03 30 00 207-99 G co CCGG 66.640 -999.990 ... V2 2018 01 11 17 10 00 -40.6830 144.6900 164.00 94.00 70.00 436761 CGO 2017 11 10 03 30 00 208-99 G co CCGG 64.820 -999.990 ... V2 2018 01 11 17 26 00 -40.6830 144.6900 164.00 94.00 70.00 436762 CGO 2017 11 17 00 42 00 1707-99 G co CCGG 64.350 -999.990 ... V2 2018 01 11 16 38 00 -40.6830 144.6900 164.00 94.00 70.00 436759 CGO 2017 11 17 00 42 00 1708-99 G co CCGG 72.030 -999.990 N.. V2 2018 01 11 16 54 00 -40.6830 144.6900 164.00 94.00 70.00 436760 CGO 2017 11 24 02 38 00 5169-99 G co CCGG 73.000 -999.990 .X. V2 2018 01 17 10 07 00 -40.6830 144.6900 164.00 94.00 70.00 436860 CGO 2017 11 24 02 38 00 5170-99 G co CCGG 71.180 -999.990 .X. V2 2018 01 17 10 22 00 -40.6830 144.6900 164.00 94.00 70.00 436861 CGO 2017 11 26 23 45 00 1453-99 G co CCGG 56.770 -999.990 ... V2 2018 01 16 15 30 00 -40.6830 144.6900 164.00 94.00 70.00 436858 CGO 2017 11 26 23 45 00 1454-99 G co CCGG 56.510 -999.990 ... V2 2018 01 16 15 46 00 -40.6830 144.6900 164.00 94.00 70.00 436859 CGO 2017 12 01 04 30 00 1310-99 G co CCGG 63.930 -999.990 .X. V2 2018 01 23 12 54 00 -40.6830 144.6900 164.00 94.00 70.00 437213 CGO 2017 12 01 04 30 00 3991-99 G co CCGG 63.690 -999.990 .X. V2 2018 01 23 12 38 00 -40.6830 144.6900 164.00 94.00 70.00 437214 CGO 2017 12 08 00 13 00 1458-99 G co CCGG 55.090 -999.990 ... V2 2018 01 23 12 06 00 -40.6830 144.6900 164.00 94.00 70.00 437215 CGO 2017 12 08 00 13 00 4234-99 G co CCGG 54.040 -999.990 ... V2 2018 01 23 12 22 00 -40.6830 144.6900 164.00 94.00 70.00 437216 CGO 2017 12 13 23 45 00 1375-99 G co CCGG 58.740 -999.990 N.. V2 2018 03 13 15 51 00 -40.6830 144.6900 164.00 94.00 70.00 439960 CGO 2017 12 13 23 45 00 1376-99 G co CCGG 59.010 -999.990 N.. V2 2018 03 13 16 07 00 -40.6830 144.6900 164.00 94.00 70.00 439961 CGO 2017 12 20 00 05 00 5159-99 G co CCGG 51.450 -999.990 ... V2 2018 03 13 14 16 00 -40.6830 144.6900 164.00 94.00 70.00 439958 CGO 2017 12 20 00 05 00 5160-99 G co CCGG 54.290 -999.990 ... V2 2018 03 13 14 32 00 -40.6830 144.6900 164.00 94.00 70.00 439959 CGO 2017 12 25 23 52 00 4085-99 G co CCGG 50.830 -999.990 ... V2 2018 03 08 13 19 00 -40.6830 144.6900 164.00 94.00 70.00 439614 CGO 2017 12 25 23 52 00 4086-99 G co CCGG 50.080 -999.990 ... V2 2018 03 08 13 35 00 -40.6830 144.6900 164.00 94.00 70.00 439615 CGO 2018 01 02 00 15 00 5227-99 G co CCGG 48.180 -999.990 ... V2 2018 03 08 12 47 00 -40.6830 144.6900 164.00 94.00 70.00 439612 CGO 2018 01 02 00 15 00 5228-99 G co CCGG 49.290 -999.990 ... V2 2018 03 08 13 03 00 -40.6830 144.6900 164.00 94.00 70.00 439613 CGO 2018 01 09 00 19 00 381-99 G co CCGG 49.000 -999.990 ... V2 2018 03 07 15 05 00 -40.6830 144.6900 164.00 94.00 70.00 439622 CGO 2018 01 09 00 19 00 382-99 G co CCGG 46.720 -999.990 ... V2 2018 03 07 15 21 00 -40.6830 144.6900 164.00 94.00 70.00 439623 CGO 2018 01 18 23 28 00 4417-99 G co CCGG 67.320 -999.990 N.. V2 2018 03 07 15 37 00 -40.6830 144.6900 164.00 94.00 70.00 439620 CGO 2018 01 18 23 28 00 4418-99 G co CCGG 79.710 -999.990 N.. V2 2018 03 07 15 52 00 -40.6830 144.6900 164.00 94.00 70.00 439621 CGO 2018 01 22 00 32 00 5833-99 G co CCGG 47.690 -999.990 ... V2 2018 03 07 13 46 00 -40.6830 144.6900 164.00 94.00 70.00 439618 CGO 2018 01 22 00 32 00 5834-99 G co CCGG 49.160 -999.990 ... V2 2018 03 07 14 01 00 -40.6830 144.6900 164.00 94.00 70.00 439619 CGO 2018 02 02 01 41 00 5551-99 G co CCGG 46.350 -999.990 ... V2 2018 03 08 13 51 00 -40.6830 144.6900 164.00 94.00 70.00 439616 CGO 2018 02 02 01 41 00 5552-99 G co CCGG 43.810 -999.990 ... V2 2018 03 08 14 07 00 -40.6830 144.6900 164.00 94.00 70.00 439617 CGO 2018 02 09 01 21 00 759-99 G co CCGG 50.030 -999.990 ... V2 2018 05 31 11 48 00 -40.6830 144.6900 164.00 94.00 70.00 444155 CGO 2018 02 09 01 21 00 760-99 G co CCGG 49.960 -999.990 ... V2 2018 05 31 12 04 00 -40.6830 144.6900 164.00 94.00 70.00 444156 CGO 2018 02 16 00 25 00 2713-99 G co CCGG 42.630 -999.990 ... V2 2018 05 31 12 20 00 -40.6830 144.6900 164.00 94.00 70.00 444153 CGO 2018 02 16 00 25 00 2714-99 G co CCGG 42.170 -999.990 ... V2 2018 05 31 12 36 00 -40.6830 144.6900 164.00 94.00 70.00 444154 CGO 2018 02 22 23 44 00 3403-99 G co CCGG 51.350 -999.990 ... V2 2018 05 30 15 26 00 -40.6830 144.6900 164.00 94.00 70.00 444143 CGO 2018 02 22 23 44 00 3404-99 G co CCGG 49.840 -999.990 ... V2 2018 05 30 15 41 00 -40.6830 144.6900 164.00 94.00 70.00 444144 CGO 2018 03 01 03 18 00 3985-99 G co CCGG 43.780 -999.990 ... V2 2018 05 30 14 54 00 -40.6830 144.6900 164.00 94.00 70.00 444141 CGO 2018 03 01 03 18 00 3986-99 G co CCGG 43.700 -999.990 ... V2 2018 05 30 15 10 00 -40.6830 144.6900 164.00 94.00 70.00 444142 CGO 2018 03 09 00 33 00 1983-99 G co CCGG 46.520 -999.990 ... V2 2018 07 03 10 46 00 -40.6830 144.6900 164.00 94.00 70.00 445816 CGO 2018 03 09 00 33 00 1984-99 G co CCGG 47.310 -999.990 ... V2 2018 07 03 11 02 00 -40.6830 144.6900 164.00 94.00 70.00 445817 CGO 2018 03 13 00 38 00 595-99 G co CCGG 44.090 -999.990 ... V2 2018 07 03 10 15 00 -40.6830 144.6900 164.00 94.00 70.00 445812 CGO 2018 03 13 00 38 00 596-99 G co CCGG 43.610 -999.990 ... V2 2018 07 03 10 31 00 -40.6830 144.6900 164.00 94.00 70.00 445813 CGO 2018 03 19 22 05 00 1683-99 G co CCGG 44.300 -999.990 ... V2 2018 07 02 14 43 00 -40.6830 144.6900 164.00 94.00 70.00 445822 CGO 2018 03 19 22 05 00 1684-99 G co CCGG 44.490 -999.990 ... V2 2018 07 02 14 59 00 -40.6830 144.6900 164.00 94.00 70.00 445823 CGO 2018 03 25 23 50 00 5411-99 G co CCGG 45.700 -999.990 ... V2 2018 07 02 14 11 00 -40.6830 144.6900 164.00 94.00 70.00 445818 CGO 2018 03 25 23 50 00 5412-99 G co CCGG 47.810 -999.990 ... V2 2018 07 02 14 27 00 -40.6830 144.6900 164.00 94.00 70.00 445819 CGO 2018 04 04 01 03 00 4701-99 G co CCGG 46.490 -999.990 ... V2 2018 07 02 17 21 00 -40.6830 144.6900 164.00 94.00 70.00 445824 CGO 2018 04 04 01 03 00 4702-99 G co CCGG 46.450 -999.990 ... V2 2018 07 02 17 37 00 -40.6830 144.6900 164.00 94.00 70.00 445825 CGO 2018 04 13 04 14 00 2869-99 G co CCGG 50.220 -999.990 ... V2 2018 07 02 15 15 00 -40.6830 144.6900 164.00 94.00 70.00 445820 CGO 2018 04 13 04 14 00 2870-99 G co CCGG 50.850 -999.990 ... V2 2018 07 02 15 30 00 -40.6830 144.6900 164.00 94.00 70.00 445821 CGO 2018 04 16 00 42 00 3477-99 G co CCGG 45.700 -999.990 ... V2 2018 07 17 11 42 00 -40.6830 144.6900 164.00 94.00 70.00 446445 CGO 2018 04 16 00 42 00 3478-99 G co CCGG 46.380 -999.990 ... V2 2018 07 17 11 58 00 -40.6830 144.6900 164.00 94.00 70.00 446446 CGO 2018 04 26 01 30 00 1051-99 G co CCGG 48.640 -999.990 ... V2 2018 07 17 11 11 00 -40.6830 144.6900 164.00 94.00 70.00 446443 CGO 2018 04 26 01 30 00 1052-99 G co CCGG 46.900 -999.990 ... V2 2018 07 17 11 26 00 -40.6830 144.6900 164.00 94.00 70.00 446444 CGO 2018 05 11 01 49 00 3363-99 G co CCGG 51.850 -999.990 ... V2 2018 07 03 09 43 00 -40.6830 144.6900 164.00 94.00 70.00 445814 CGO 2018 05 11 01 49 00 3364-99 G co CCGG 51.140 -999.990 ... V2 2018 07 03 09 59 00 -40.6830 144.6900 164.00 94.00 70.00 445815 CGO 2018 05 18 00 26 00 2805-99 G co CCGG 57.250 -999.990 ... V2 2018 07 02 13 40 00 -40.6830 144.6900 164.00 94.00 70.00 445810 CGO 2018 05 18 00 26 00 2806-99 G co CCGG 58.910 -999.990 ... V2 2018 07 02 13 56 00 -40.6830 144.6900 164.00 94.00 70.00 445811 CGO 2018 05 24 00 33 00 1521-99 G co CCGG 52.400 -999.990 ... V2 2018 08 23 09 36 00 -40.6830 144.6900 164.00 94.00 70.00 448043 CGO 2018 05 24 00 33 00 1522-99 G co CCGG 51.920 -999.990 ... V2 2018 08 23 09 51 00 -40.6830 144.6900 164.00 94.00 70.00 448044 CGO 2018 06 01 03 25 00 749-99 G co CCGG 56.710 -999.990 ... V2 2018 08 23 10 07 00 -40.6830 144.6900 164.00 94.00 70.00 448045 CGO 2018 06 01 03 25 00 750-99 G co CCGG 58.630 -999.990 ... V2 2018 08 23 10 23 00 -40.6830 144.6900 164.00 94.00 70.00 448046 CGO 2018 06 08 04 45 00 3719-99 G co CCGG 52.180 -999.990 ... V2 2018 07 17 10 39 00 -40.6830 144.6900 164.00 94.00 70.00 446441 CGO 2018 06 08 04 45 00 3720-99 G co CCGG 52.320 -999.990 ... V2 2018 07 17 10 55 00 -40.6830 144.6900 164.00 94.00 70.00 446442 CGO 2018 06 15 01 53 00 331-99 G co CCGG 56.760 -999.990 ... V2 2018 07 12 16 05 00 -40.6830 144.6900 164.00 94.00 70.00 446376 CGO 2018 06 15 01 53 00 332-99 G co CCGG 54.340 -999.990 ... V2 2018 07 12 16 21 00 -40.6830 144.6900 164.00 94.00 70.00 446377 CGO 2018 06 22 03 26 00 3537-99 G co CCGG 55.870 -999.990 ... V2 2018 08 23 10 39 00 -40.6830 144.6900 164.00 94.00 70.00 448035 CGO 2018 06 22 03 26 00 3538-99 G co CCGG 55.790 -999.990 ... V2 2018 08 23 10 55 00 -40.6830 144.6900 164.00 94.00 70.00 448036 CGO 2018 07 06 00 02 00 261-99 G co CCGG 57.740 -999.990 ... V2 2018 08 23 11 10 00 -40.6830 144.6900 164.00 94.00 70.00 448037 CGO 2018 07 06 00 02 00 262-99 G co CCGG 55.920 -999.990 ... V2 2018 08 23 11 26 00 -40.6830 144.6900 164.00 94.00 70.00 448038 CGO 2018 07 13 05 12 00 1667-99 G co CCGG 59.340 -999.990 ... V2 2018 08 23 12 14 00 -40.6830 144.6900 164.00 94.00 70.00 448041 CGO 2018 07 13 05 12 00 1668-99 G co CCGG 61.600 -999.990 ... V2 2018 08 23 12 29 00 -40.6830 144.6900 164.00 94.00 70.00 448042 CGO 2018 07 20 00 18 00 5155-99 G co CCGG 59.000 -999.990 ... V2 2018 08 23 11 42 00 -40.6830 144.6900 164.00 94.00 70.00 448039 CGO 2018 07 20 00 18 00 5156-99 G co CCGG 57.140 -999.990 ... V2 2018 08 23 11 58 00 -40.6830 144.6900 164.00 94.00 70.00 448040 CGO 2018 08 03 05 44 00 4505-99 G co CCGG 81.880 -999.990 N.. V2 2018 09 24 15 24 00 -40.6830 144.6900 164.00 94.00 70.00 449211 CGO 2018 08 03 05 44 00 4506-99 G co CCGG 82.190 -999.990 N.. V2 2018 09 24 15 40 00 -40.6830 144.6900 164.00 94.00 70.00 449210 CGO 2018 08 08 01 14 00 851-99 G co CCGG 61.850 -999.990 ... V2 2018 09 24 14 53 00 -40.6830 144.6900 164.00 94.00 70.00 449212 CGO 2018 08 08 01 14 00 852-99 G co CCGG 62.900 -999.990 ... V2 2018 09 24 15 09 00 -40.6830 144.6900 164.00 94.00 70.00 449213 CGO 2018 08 16 02 13 00 3305-99 G co CCGG 60.420 -999.990 ... V2 2018 09 20 12 14 00 -40.6830 144.6900 164.00 94.00 70.00 449222 CGO 2018 08 16 02 13 00 3306-99 G co CCGG 69.350 -999.990 N.. V2 2018 09 20 12 30 00 -40.6830 144.6900 164.00 94.00 70.00 449223 CGO 2018 08 24 02 53 00 5475-99 G co CCGG 66.450 -999.990 ... V2 2018 09 20 12 48 00 -40.6830 144.6900 164.00 94.00 70.00 449224 CGO 2018 08 24 02 53 00 5476-99 G co CCGG 68.150 -999.990 ... V2 2018 09 20 13 03 00 -40.6830 144.6900 164.00 94.00 70.00 449225 CGO 2018 09 07 05 39 00 1361-99 G co CCGG 63.080 -999.990 ... V2 2018 11 02 10 01 00 -40.6830 144.6900 164.00 94.00 70.00 450985 CGO 2018 09 07 05 39 00 1362-99 G co CCGG 61.270 -999.990 ... V2 2018 11 02 10 17 00 -40.6830 144.6900 164.00 94.00 70.00 450986 CGO 2018 09 14 04 08 00 513-99 G co CCGG 75.090 -999.990 .X. V2 2018 11 02 11 04 00 -40.6830 144.6900 164.00 94.00 70.00 450983 CGO 2018 09 14 04 08 00 514-99 G co CCGG 76.840 -999.990 .X. V2 2018 11 02 11 20 00 -40.6830 144.6900 164.00 94.00 70.00 450984 CGO 2018 09 19 01 41 00 3813-99 G co CCGG 62.850 -999.990 ... V2 2018 11 02 11 36 00 -40.6830 144.6900 164.00 94.00 70.00 450989 CGO 2018 09 19 01 41 00 3814-99 G co CCGG 62.810 -999.990 ... V2 2018 11 02 11 52 00 -40.6830 144.6900 164.00 94.00 70.00 450990 CGO 2018 09 28 01 10 00 1393-99 G co CCGG 63.250 -999.990 ... V2 2018 11 02 12 07 00 -40.6830 144.6900 164.00 94.00 70.00 450987 CGO 2018 09 28 01 10 00 1394-99 G co CCGG 62.880 -999.990 ... V2 2018 11 02 12 23 00 -40.6830 144.6900 164.00 94.00 70.00 450988 CGO 2018 10 05 02 14 00 4297-99 G co CCGG 64.730 -999.990 ... V2 2018 11 29 14 25 00 -40.6830 144.6900 164.00 94.00 70.00 451776 CGO 2018 10 05 02 14 00 4298-99 G co CCGG 62.790 -999.990 ... V2 2018 11 29 14 41 00 -40.6830 144.6900 164.00 94.00 70.00 451777 CGO 2018 10 12 01 57 00 847-99 G co CCGG 63.590 -999.990 ... V2 2018 11 29 14 56 00 -40.6830 144.6900 164.00 94.00 70.00 451778 CGO 2018 10 12 01 57 00 848-99 G co CCGG 65.800 -999.990 ... V2 2018 11 29 15 12 00 -40.6830 144.6900 164.00 94.00 70.00 451779 CGO 2018 10 19 00 50 00 4723-99 G co CCGG 72.840 -999.990 .X. V2 2018 11 29 16 31 00 -40.6830 144.6900 164.00 94.00 70.00 451782 CGO 2018 10 19 00 50 00 4724-99 G co CCGG 74.970 -999.990 .X. V2 2018 11 29 16 47 00 -40.6830 144.6900 164.00 94.00 70.00 451783 CGO 2018 10 23 00 37 00 2551-99 G co CCGG 61.270 -999.990 ... V2 2018 11 29 15 28 00 -40.6830 144.6900 164.00 94.00 70.00 451781 CGO 2018 10 23 00 37 00 2552-99 G co CCGG 62.620 -999.990 ... V2 2018 11 29 15 44 00 -40.6830 144.6900 164.00 94.00 70.00 451780 CGO 2018 11 02 01 43 00 3889-99 G co CCGG 80.730 -999.990 .X. V2 2019 01 30 12 53 00 -40.6830 144.6900 164.00 94.00 70.00 453554 CGO 2018 11 02 01 43 00 3890-99 G co CCGG 81.150 -999.990 .X. V2 2019 01 30 13 09 00 -40.6830 144.6900 164.00 94.00 70.00 453555 CGO 2018 11 06 23 34 00 3327-99 G co CCGG 56.790 -999.990 ... V2 2019 02 04 11 46 00 -40.6830 144.6900 164.00 94.00 70.00 453636 CGO 2018 11 06 23 34 00 3328-99 G co CCGG 57.690 -999.990 ... V2 2019 02 04 12 02 00 -40.6830 144.6900 164.00 94.00 70.00 453637 CGO 2018 11 13 23 31 00 4543-99 G co CCGG 68.100 -999.990 N.. V2 2019 01 30 11 19 00 -40.6830 144.6900 164.00 94.00 70.00 453552 CGO 2018 11 13 23 31 00 4544-99 G co CCGG 59.020 -999.990 ... V2 2019 01 30 11 34 00 -40.6830 144.6900 164.00 94.00 70.00 453553 CGO 2018 11 23 02 44 00 1543-99 G co CCGG 55.770 -999.990 ... V2 2019 01 30 12 22 00 -40.6830 144.6900 164.00 94.00 70.00 453550 CGO 2018 11 23 02 44 00 1544-99 G co CCGG 65.570 -999.990 N.. V2 2019 01 30 12 38 00 -40.6830 144.6900 164.00 94.00 70.00 453551 CGO 2018 11 29 03 13 00 3033-99 G co CCGG 54.330 -999.990 ... V2 2019 02 28 14 40 00 -40.6830 144.6900 164.00 94.00 70.00 454703 CGO 2018 11 29 03 13 00 3034-99 G co CCGG 52.820 -999.990 ... V2 2019 02 28 14 56 00 -40.6830 144.6900 164.00 94.00 70.00 454704 CGO 2018 12 07 03 37 00 4429-99 G co CCGG 85.870 -999.990 .X. V2 2019 02 28 13 05 00 -40.6830 144.6900 164.00 94.00 70.00 454705 CGO 2018 12 07 03 37 00 4493-99 G co CCGG 87.890 -999.990 .X. V2 2019 02 28 13 21 00 -40.6830 144.6900 164.00 94.00 70.00 454706 CGO 2018 12 10 01 36 00 5773-99 G co CCGG 51.180 -999.990 ... V2 2019 02 27 17 14 00 -40.6830 144.6900 164.00 94.00 70.00 454684 CGO 2018 12 10 01 36 00 5774-99 G co CCGG 49.780 -999.990 ... V2 2019 02 27 17 30 00 -40.6830 144.6900 164.00 94.00 70.00 454685 CGO 2018 12 17 00 41 00 1229-99 G co CCGG 51.990 -999.990 ... V2 2019 02 28 12 34 00 -40.6830 144.6900 164.00 94.00 70.00 454701 CGO 2018 12 17 00 41 00 1230-99 G co CCGG 51.800 -999.990 ... V2 2019 02 28 12 49 00 -40.6830 144.6900 164.00 94.00 70.00 454702 CGO 2019 01 04 03 12 00 341-99 G co CCGG 71.970 -999.990 .X. V2 2019 03 07 15 30 00 -40.6830 144.6900 164.00 94.00 70.00 455227 CGO 2019 01 04 03 12 00 342-99 G co CCGG 71.070 -999.990 .X. V2 2019 03 07 15 46 00 -40.6830 144.6900 164.00 94.00 70.00 455228 CGO 2019 01 09 01 29 00 4125-99 G co CCGG 43.360 -999.990 ... V2 2019 03 07 16 02 00 -40.6830 144.6900 164.00 94.00 70.00 455229 CGO 2019 01 09 01 29 00 4126-99 G co CCGG 44.030 -999.990 ... V2 2019 03 07 16 17 00 -40.6830 144.6900 164.00 94.00 70.00 455230 CGO 2019 01 18 00 59 00 49-99 G co CCGG 46.130 -999.990 ... V2 2019 03 06 12 29 00 -40.6830 144.6900 164.00 94.00 70.00 455225 CGO 2019 01 18 00 59 00 50-99 G co CCGG 45.570 -999.990 ... V2 2019 03 06 12 45 00 -40.6830 144.6900 164.00 94.00 70.00 455226 CGO 2019 01 25 00 57 00 5669-99 G co CCGG 86.380 -999.990 .X. V2 2019 03 06 13 01 00 -40.6830 144.6900 164.00 94.00 70.00 455223 CGO 2019 01 25 00 57 00 5670-99 G co CCGG 87.820 -999.990 .X. V2 2019 03 06 13 16 00 -40.6830 144.6900 164.00 94.00 70.00 455224 CGO 2019 01 30 23 01 00 3797-99 G co CCGG 41.860 -999.990 ... V2 2019 03 06 11 25 00 -40.6830 144.6900 164.00 94.00 70.00 455221 CGO 2019 01 30 23 01 00 3798-99 G co CCGG 42.520 -999.990 ... V2 2019 03 06 11 41 00 -40.6830 144.6900 164.00 94.00 70.00 455222 CGO 2019 02 07 23 21 00 1829-99 G co CCGG 43.630 -999.990 ... V2 2019 03 06 11 57 00 -40.6830 144.6900 164.00 94.00 70.00 455219 CGO 2019 02 07 23 21 00 1830-99 G co CCGG 72.030 -999.990 N.. V2 2019 03 06 12 13 00 -40.6830 144.6900 164.00 94.00 70.00 455220 CGO 2019 02 14 02 29 00 5507-99 G co CCGG 42.530 -999.990 ... V2 2019 05 22 12 57 00 -40.6830 144.6900 164.00 94.00 70.00 458689 CGO 2019 02 14 02 29 00 5508-99 G co CCGG 42.880 -999.990 ... V2 2019 05 22 13 13 00 -40.6830 144.6900 164.00 94.00 70.00 458690 CGO 2019 02 21 00 26 00 5081-99 G co CCGG 42.800 -999.990 ... V2 2019 05 22 13 28 00 -40.6830 144.6900 164.00 94.00 70.00 458691 CGO 2019 02 21 00 26 00 5082-99 G co CCGG 42.710 -999.990 ... V2 2019 05 22 13 44 00 -40.6830 144.6900 164.00 94.00 70.00 458692 CGO 2019 02 28 23 43 00 1045-99 G co CCGG 67.840 -999.990 .X. V2 2019 05 20 14 21 00 -40.6830 144.6900 164.00 94.00 70.00 458707 CGO 2019 02 28 23 43 00 1046-99 G co CCGG 68.410 -999.990 .X. V2 2019 05 20 14 37 00 -40.6830 144.6900 164.00 94.00 70.00 458708 CGO 2019 03 06 10 11 00 5467-99 G co CCGG 44.990 -999.990 ... V2 2019 05 20 14 53 00 -40.6830 144.6900 164.00 94.00 70.00 458705 CGO 2019 03 06 10 11 00 5468-99 G co CCGG 43.200 -999.990 ... V2 2019 05 20 15 08 00 -40.6830 144.6900 164.00 94.00 70.00 458706 CGO 2019 03 15 02 59 00 131-99 G co CCGG 44.590 -999.990 ... AR2 2019 08 27 15 58 22 -40.6830 144.6900 164.00 94.00 70.00 463765 CGO 2019 03 15 02 59 00 132-99 G co CCGG 45.140 -999.990 ... AR2 2019 08 27 16 12 45 -40.6830 144.6900 164.00 94.00 70.00 463766 CGO 2019 03 22 00 42 00 5537-99 G co CCGG 58.850 -999.990 .X. AR2 2019 08 27 15 29 42 -40.6830 144.6900 164.00 94.00 70.00 463763 CGO 2019 03 22 00 42 00 5538-99 G co CCGG 57.690 -999.990 .X. AR2 2019 08 27 15 43 59 -40.6830 144.6900 164.00 94.00 70.00 463764 CGO 2019 03 25 23 57 00 385-99 G co CCGG 44.460 -999.990 ... AR2 2019 08 27 13 35 01 -40.6830 144.6900 164.00 94.00 70.00 463713 CGO 2019 03 25 23 57 00 386-99 G co CCGG 44.480 -999.990 ... AR2 2019 08 27 13 49 24 -40.6830 144.6900 164.00 94.00 70.00 463714 CGO 2019 04 01 00 37 00 2047-99 G co CCGG 46.520 -999.990 ... AR2 2019 08 27 14 03 43 -40.6830 144.6900 164.00 94.00 70.00 463711 CGO 2019 04 01 00 37 00 2048-99 G co CCGG 46.290 -999.990 ... AR2 2019 08 27 14 18 00 -40.6830 144.6900 164.00 94.00 70.00 463712 CGO 2019 04 09 02 42 00 5133-99 G co CCGG 45.840 -999.990 ... AR2 2019 08 29 14 26 01 -40.6830 144.6900 164.00 94.00 70.00 463847 CGO 2019 04 09 02 42 00 5134-99 G co CCGG 45.590 -999.990 ... AR2 2019 08 29 14 40 18 -40.6830 144.6900 164.00 94.00 70.00 463848 CGO 2019 04 18 01 48 00 2867-99 G co CCGG 46.650 -999.990 ... AR2 2019 08 29 13 57 22 -40.6830 144.6900 164.00 94.00 70.00 463845 CGO 2019 04 18 01 48 00 2868-99 G co CCGG 46.570 -999.990 ... AR2 2019 08 29 14 11 43 -40.6830 144.6900 164.00 94.00 70.00 463846 CGO 2019 04 24 04 37 00 2159-99 G co CCGG 48.120 -999.990 ... AR2 2019 08 29 12 59 59 -40.6830 144.6900 164.00 94.00 70.00 463865 CGO 2019 04 24 04 37 00 2160-99 G co CCGG 47.620 -999.990 ... AR2 2019 08 29 13 14 21 -40.6830 144.6900 164.00 94.00 70.00 463866 CGO 2019 05 02 05 14 00 4549-99 G co CCGG 57.090 -999.990 .X. AR2 2019 08 29 12 31 19 -40.6830 144.6900 164.00 94.00 70.00 463867 CGO 2019 05 02 05 14 00 4550-99 G co CCGG 56.810 -999.990 .X. AR2 2019 08 29 12 45 38 -40.6830 144.6900 164.00 94.00 70.00 463868 CGO 2019 05 15 00 45 00 5707-99 G co CCGG 50.500 -999.990 ... AR2 2019 08 27 12 37 34 -40.6830 144.6900 164.00 94.00 70.00 463715 CGO 2019 05 15 00 45 00 5708-99 G co CCGG 50.290 -999.990 ... AR2 2019 08 27 12 51 53 -40.6830 144.6900 164.00 94.00 70.00 463716 CGO 2019 05 24 03 50 00 5121-99 G co CCGG 94.760 -999.990 .X. AR2 2019 08 27 13 20 42 -40.6830 144.6900 164.00 94.00 70.00 463709 CGO 2019 05 24 03 50 00 5122-99 G co CCGG 94.740 -999.990 .X. AR2 2019 08 27 13 06 19 -40.6830 144.6900 164.00 94.00 70.00 463710 CGO 2019 05 27 01 09 00 3899-99 G co CCGG 52.440 -999.990 ... AR2 2019 08 30 12 47 54 -40.6830 144.6900 164.00 94.00 70.00 463849 CGO 2019 05 27 01 09 00 3900-99 G co CCGG 52.360 -999.990 ... AR2 2019 08 30 13 02 19 -40.6830 144.6900 164.00 94.00 70.00 463850 CGO 2019 06 06 03 29 00 729-99 G co CCGG 56.290 -999.990 ... AR2 2019 08 29 14 54 41 -40.6830 144.6900 164.00 94.00 70.00 463851 CGO 2019 06 06 03 29 00 730-99 G co CCGG 56.250 -999.990 ... AR2 2019 08 29 15 08 58 -40.6830 144.6900 164.00 94.00 70.00 463852 CGO 2019 06 14 04 00 00 1143-99 G co CCGG 54.170 -999.990 ... AR2 2019 09 16 11 54 34 -40.6830 144.6900 164.00 94.00 70.00 464399 CGO 2019 06 14 04 00 00 1144-99 G co CCGG 54.050 -999.990 ... AR2 2019 09 16 12 08 53 -40.6830 144.6900 164.00 94.00 70.00 464400 CGO 2019 06 19 04 31 00 5169-99 G co CCGG 54.330 -999.990 ... AR2 2019 09 10 14 09 44 -40.6830 144.6900 164.00 94.00 70.00 464381 CGO 2019 06 19 04 31 00 5170-99 G co CCGG 54.380 -999.990 ... AR2 2019 09 10 14 24 01 -40.6830 144.6900 164.00 94.00 70.00 464382 CGO 2019 06 28 00 46 00 1201-99 G co CCGG 67.970 -999.990 .X. AR2 2019 09 10 12 15 20 -40.6830 144.6900 164.00 94.00 70.00 464375 CGO 2019 06 28 00 46 00 1202-99 G co CCGG 67.900 -999.990 .X. AR2 2019 09 10 12 29 35 -40.6830 144.6900 164.00 94.00 70.00 464376 CGO 2019 07 02 01 25 00 2775-99 G co CCGG 56.780 -999.990 ... AR2 2019 09 11 12 21 00 -40.6830 144.6900 164.00 94.00 70.00 464389 CGO 2019 07 02 01 25 00 2776-99 G co CCGG 56.460 -999.990 ... AR2 2019 09 11 12 35 18 -40.6830 144.6900 164.00 94.00 70.00 464390 CGO 2019 07 11 00 46 00 749-99 G co CCGG 57.850 -999.990 ... AR2 2019 09 10 13 41 08 -40.6830 144.6900 164.00 94.00 70.00 464379 CGO 2019 07 11 00 46 00 750-99 G co CCGG 57.780 -999.990 ... AR2 2019 09 10 13 55 23 -40.6830 144.6900 164.00 94.00 70.00 464380 CGO 2019 07 16 00 29 00 2215-99 G co CCGG 62.390 -999.990 ... AR2 2019 09 10 12 44 00 -40.6830 144.6900 164.00 94.00 70.00 464377 CGO 2019 07 16 00 29 00 2216-99 G co CCGG 61.890 -999.990 ... AR2 2019 09 10 12 58 18 -40.6830 144.6900 164.00 94.00 70.00 464378 CGO 2019 09 06 04 22 00 3741-99 G co CCGG 68.360 -999.990 ... AR2 2019 11 14 16 42 27 -40.6830 144.6900 164.00 94.00 70.00 467006 CGO 2019 09 06 04 22 00 3742-99 G co CCGG 68.040 -999.990 ... AR2 2019 11 14 16 56 46 -40.6830 144.6900 164.00 94.00 70.00 467007 CGO 2019 09 09 01 55 00 5237-99 G co CCGG 63.120 -999.990 ... AR2 2019 11 14 16 13 42 -40.6830 144.6900 164.00 94.00 70.00 467004 CGO 2019 09 09 01 55 00 5238-99 G co CCGG 63.200 -999.990 ... AR2 2019 11 14 16 28 07 -40.6830 144.6900 164.00 94.00 70.00 467005 CGO 2019 09 16 01 05 00 5023-99 G co CCGG 63.940 -999.990 ... AR2 2019 11 14 15 45 00 -40.6830 144.6900 164.00 94.00 70.00 467002 CGO 2019 09 16 01 05 00 5024-99 G co CCGG 63.870 -999.990 ... AR2 2019 11 14 15 59 23 -40.6830 144.6900 164.00 94.00 70.00 467003 CGO 2019 09 24 00 53 00 1361-99 G co CCGG 63.350 -999.990 ... AR2 2019 11 14 15 16 18 -40.6830 144.6900 164.00 94.00 70.00 467000 CGO 2019 09 24 00 53 00 1362-99 G co CCGG 63.030 -999.990 ... AR2 2019 11 14 15 30 36 -40.6830 144.6900 164.00 94.00 70.00 467001 CGO 2019 09 30 01 00 00 5565-99 G co CCGG 64.120 -999.990 ... AR2 2020 03 03 09 23 58 -40.6830 144.6900 164.00 94.00 70.00 471390 CGO 2019 09 30 01 00 00 5566-99 G co CCGG 64.230 -999.990 ... AR2 2020 03 03 09 38 23 -40.6830 144.6900 164.00 94.00 70.00 471391 CGO 2019 10 08 23 51 00 5507-99 G co CCGG 65.430 -999.990 ... AR2 2020 03 02 17 11 15 -40.6830 144.6900 164.00 94.00 70.00 471388 CGO 2019 10 08 23 51 00 5508-99 G co CCGG 65.160 -999.990 ... AR2 2020 03 02 17 25 33 -40.6830 144.6900 164.00 94.00 70.00 471389 CGO 2019 10 18 01 00 00 2817-99 G co CCGG 68.700 -999.990 ... AR2 2020 03 02 16 13 49 -40.6830 144.6900 164.00 94.00 70.00 471384 CGO 2019 10 18 01 00 00 2818-99 G co CCGG 68.540 -999.990 ... AR2 2020 03 02 16 28 11 -40.6830 144.6900 164.00 94.00 70.00 471385 CGO 2019 10 22 00 27 00 17-99 G co CCGG 70.790 -999.990 ... AR2 2020 03 02 16 42 32 -40.6830 144.6900 164.00 94.00 70.00 471386 CGO 2019 10 22 00 27 00 18-99 G co CCGG 70.290 -999.990 ... AR2 2020 03 02 16 56 51 -40.6830 144.6900 164.00 94.00 70.00 471387 CGO 2019 11 08 00 11 00 4933-99 G co CCGG 62.450 -999.990 ... AR2 2020 03 02 13 50 19 -40.6830 144.6900 164.00 94.00 70.00 471394 CGO 2019 11 08 00 11 00 4934-99 G co CCGG 61.920 -999.990 ... AR2 2020 03 02 14 04 36 -40.6830 144.6900 164.00 94.00 70.00 471395 CGO 2019 11 14 10 45 00 4871-99 G co CCGG 61.480 -999.990 ... AR2 2020 03 02 13 21 42 -40.6830 144.6900 164.00 94.00 70.00 471392 CGO 2019 11 14 10 45 00 4872-99 G co CCGG 61.700 -999.990 ... AR2 2020 03 02 13 36 03 -40.6830 144.6900 164.00 94.00 70.00 471393 CGO 2019 11 22 00 28 00 3515-99 G co CCGG 58.930 -999.990 ... AR2 2020 03 02 14 18 57 -40.6830 144.6900 164.00 94.00 70.00 471397 CGO 2019 11 22 00 28 00 3516-99 G co CCGG 59.520 -999.990 ... AR2 2020 03 02 14 33 18 -40.6830 144.6900 164.00 94.00 70.00 471398 CGO 2019 11 29 03 10 00 398-99 G co CCGG 57.370 -999.990 ... AR2 2020 03 02 14 47 36 -40.6830 144.6900 164.00 94.00 70.00 471396 CGO 2019 12 02 01 32 00 1259-99 G co CCGG 56.950 -999.990 ... AR2 2020 03 19 12 26 18 -40.6830 144.6900 164.00 94.00 70.00 471711 CGO 2019 12 02 01 32 00 1260-99 G co CCGG 57.010 -999.990 ... AR2 2020 03 19 12 40 46 -40.6830 144.6900 164.00 94.00 70.00 471712 CGO 2019 12 12 00 00 00 3671-99 G co CCGG 57.890 -999.990 ... AR2 2020 03 19 13 23 55 -40.6830 144.6900 164.00 94.00 70.00 471709 CGO 2019 12 12 00 00 00 3672-99 G co CCGG 57.790 -999.990 ... AR2 2020 03 19 13 38 14 -40.6830 144.6900 164.00 94.00 70.00 471710 CGO 2019 12 20 03 36 00 2609-99 G co CCGG 58.640 -999.990 ... AR2 2020 03 19 14 21 18 -40.6830 144.6900 164.00 94.00 70.00 471713 CGO 2019 12 20 03 36 00 2610-99 G co CCGG 60.450 -999.990 ... AR2 2020 03 19 14 35 40 -40.6830 144.6900 164.00 94.00 70.00 471714 CGO 2020 01 03 04 17 00 1871-99 G co CCGG 57.690 -999.990 N.. AR2 2020 03 19 13 52 37 -40.6830 144.6900 164.00 94.00 70.00 471715 CGO 2020 01 03 04 17 00 1872-99 G co CCGG 54.480 -999.990 N.. AR2 2020 03 19 14 06 56 -40.6830 144.6900 164.00 94.00 70.00 471716 CGO 2020 01 10 03 14 00 847-99 G co CCGG 57.880 -999.990 ... AR2 2020 03 20 10 17 47 -40.6830 144.6900 164.00 94.00 70.00 471725 CGO 2020 01 10 03 14 00 848-99 G co CCGG 58.940 -999.990 ... AR2 2020 03 20 10 32 07 -40.6830 144.6900 164.00 94.00 70.00 471726 CGO 2020 01 17 01 11 00 2049-99 G co CCGG 61.480 -999.990 .X. AR2 2020 03 19 16 45 06 -40.6830 144.6900 164.00 94.00 70.00 471727 CGO 2020 01 17 01 11 00 2050-99 G co CCGG 61.200 -999.990 .X. AR2 2020 03 19 16 59 34 -40.6830 144.6900 164.00 94.00 70.00 471728 CGO 2020 01 31 03 28 00 5159-99 G co CCGG 479.830 -999.990 N.. AR2 2020 03 20 12 12 48 -40.6830 144.6900 164.00 94.00 70.00 471743 CGO 2020 01 31 03 28 00 5160-99 G co CCGG 472.750 -999.990 N.. AR2 2020 03 20 12 27 13 -40.6830 144.6900 164.00 94.00 70.00 471744 CGO 2020 02 04 23 16 00 5431-99 G co CCGG 51.880 -999.990 ... AR2 2020 03 20 11 44 02 -40.6830 144.6900 164.00 94.00 70.00 471741 CGO 2020 02 04 23 16 00 5432-99 G co CCGG 51.850 -999.990 ... AR2 2020 03 20 11 58 23 -40.6830 144.6900 164.00 94.00 70.00 471742 CGO 2020 02 14 03 36 00 3111-99 G co CCGG 58.870 -999.990 .X. AR2 2020 04 07 12 09 00 -40.6830 144.6900 164.00 94.00 70.00 472604 CGO 2020 02 14 03 36 00 3112-99 G co CCGG 58.730 -999.990 .X. AR2 2020 04 07 12 23 23 -40.6830 144.6900 164.00 94.00 70.00 472605 CGO 2020 02 19 03 22 00 4973-99 G co CCGG 53.740 -999.990 ... AR2 2020 04 07 12 37 43 -40.6830 144.6900 164.00 94.00 70.00 472606 CGO 2020 02 19 03 22 00 4974-99 G co CCGG 53.660 -999.990 ... AR2 2020 04 07 12 52 02 -40.6830 144.6900 164.00 94.00 70.00 472607 CGO 2020 03 06 01 00 00 4593-99 G co CCGG 53.920 -999.990 ... AR2 2020 05 06 10 45 27 -40.6830 144.6900 164.00 94.00 70.00 473892 CGO 2020 03 06 01 00 00 4594-99 G co CCGG 53.860 -999.990 ... AR2 2020 05 06 10 59 46 -40.6830 144.6900 164.00 94.00 70.00 473893 CGO 2020 03 13 00 17 00 3223-99 G co CCGG 62.850 -999.990 .X. AR2 2020 05 06 11 42 42 -40.6830 144.6900 164.00 94.00 70.00 473890 CGO 2020 03 13 00 17 00 3224-99 G co CCGG 63.460 -999.990 .X. AR2 2020 05 06 11 57 02 -40.6830 144.6900 164.00 94.00 70.00 473891 CGO 2020 03 20 00 26 00 5831-99 G co CCGG 51.810 -999.990 ... AR2 2020 05 06 14 06 03 -40.6830 144.6900 164.00 94.00 70.00 473896 CGO 2020 03 20 00 26 00 5832-99 G co CCGG 51.800 -999.990 ... AR2 2020 05 06 14 20 20 -40.6830 144.6900 164.00 94.00 70.00 473897 CGO 2020 04 03 05 05 00 1331-99 G co CCGG 96.720 -999.990 .X. AR2 2020 05 06 11 14 06 -40.6830 144.6900 164.00 94.00 70.00 473894 CGO 2020 04 03 05 05 00 1332-99 G co CCGG 96.830 -999.990 .X. AR2 2020 05 06 11 28 26 -40.6830 144.6900 164.00 94.00 70.00 473895 CGO 2020 04 06 01 02 00 3105-99 G co CCGG 52.890 -999.990 ... AR2 2020 07 09 10 09 44 -40.6830 144.6900 164.00 94.00 70.00 476650 CGO 2020 04 06 01 02 00 3106-99 G co CCGG 52.980 -999.990 ... AR2 2020 07 09 10 24 04 -40.6830 144.6900 164.00 94.00 70.00 476651 CGO 2020 04 17 01 40 00 2923-99 G co CCGG 52.810 -999.990 ... AR2 2020 07 14 11 52 47 -40.6830 144.6900 164.00 94.00 70.00 476670 CGO 2020 04 17 01 40 00 2924-99 G co CCGG 52.950 -999.990 ... AR2 2020 07 14 12 07 06 -40.6830 144.6900 164.00 94.00 70.00 476671 CGO 2020 04 24 01 09 00 2453-99 G co CCGG 53.590 -999.990 ... AR2 2020 07 10 15 34 58 -40.6830 144.6900 164.00 94.00 70.00 477033 CGO 2020 04 24 01 09 00 2454-99 G co CCGG 53.580 -999.990 ... AR2 2020 07 10 15 49 24 -40.6830 144.6900 164.00 94.00 70.00 477034 CGO 2020 05 01 00 22 00 1393-99 G co CCGG 53.730 -999.990 ... AR2 2020 07 10 16 03 46 -40.6830 144.6900 164.00 94.00 70.00 477035 CGO 2020 05 01 00 22 00 1394-99 G co CCGG 53.900 -999.990 ... AR2 2020 07 10 16 18 08 -40.6830 144.6900 164.00 94.00 70.00 477036 CGO 2020 05 11 01 39 00 5169-99 G co CCGG 54.480 -999.990 ... AR2 2020 07 17 09 27 50 -40.6830 144.6900 164.00 94.00 70.00 477095 CGO 2020 05 11 01 39 00 5170-99 G co CCGG 54.670 -999.990 ... AR2 2020 07 17 09 42 12 -40.6830 144.6900 164.00 94.00 70.00 477096 CGO 2020 05 21 01 10 00 141-99 G co CCGG 56.120 -999.990 ... AR2 2020 07 17 08 59 09 -40.6830 144.6900 164.00 94.00 70.00 477097 CGO 2020 05 21 01 10 00 142-99 G co CCGG 56.150 -999.990 ... AR2 2020 07 17 09 13 28 -40.6830 144.6900 164.00 94.00 70.00 477098 CGO 2020 05 29 04 58 00 2225-99 G co CCGG 59.760 -999.990 ... AR2 2020 07 16 12 14 46 -40.6830 144.6900 164.00 94.00 70.00 477025 CGO 2020 05 29 04 58 00 2226-99 G co CCGG 59.880 -999.990 ... AR2 2020 07 16 12 29 07 -40.6830 144.6900 164.00 94.00 70.00 477026 CGO 2020 06 01 02 57 00 3903-99 G co CCGG 56.500 -999.990 ... AR2 2020 07 16 15 35 49 -40.6830 144.6900 164.00 94.00 70.00 477093 CGO 2020 06 01 02 57 00 3904-99 G co CCGG 56.430 -999.990 ... AR2 2020 07 16 15 50 10 -40.6830 144.6900 164.00 94.00 70.00 477094 CGO 2020 06 12 01 45 00 3657-99 G co CCGG 71.590 -999.990 .X. AR2 2020 08 11 14 14 08 -40.6830 144.6900 164.00 94.00 70.00 478385 CGO 2020 06 12 01 45 00 3658-99 G co CCGG 71.800 -999.990 .X. AR2 2020 08 11 14 28 31 -40.6830 144.6900 164.00 94.00 70.00 478386 CGO 2020 06 16 03 30 00 5517-99 G co CCGG 59.350 -999.990 ... AR2 2020 08 11 14 42 53 -40.6830 144.6900 164.00 94.00 70.00 478387 CGO 2020 06 16 03 30 00 5518-99 G co CCGG 59.230 -999.990 ... AR2 2020 08 11 14 57 16 -40.6830 144.6900 164.00 94.00 70.00 478388 CGO 2020 06 26 01 53 00 1823-99 G co CCGG 60.180 -999.990 ... AR2 2020 08 10 15 28 52 -40.6830 144.6900 164.00 94.00 70.00 478351 CGO 2020 06 26 01 53 00 1824-99 G co CCGG 60.520 -999.990 ... AR2 2020 08 10 15 43 13 -40.6830 144.6900 164.00 94.00 70.00 478352 CGO 2020 07 03 01 59 00 5695-99 G co CCGG 61.360 -999.990 ... AR2 2020 08 10 15 00 09 -40.6830 144.6900 164.00 94.00 70.00 478349 CGO 2020 07 03 01 59 00 5696-99 G co CCGG 61.340 -999.990 ... AR2 2020 08 10 15 14 32 -40.6830 144.6900 164.00 94.00 70.00 478350 CGO 2020 07 10 04 42 00 1013-99 G co CCGG 86.050 -999.990 .X. AR2 2020 09 02 11 37 29 -40.6830 144.6900 164.00 94.00 70.00 479208 CGO 2020 07 10 04 42 00 140-99 G co CCGG 85.900 -999.990 .X. AR2 2020 09 02 11 51 58 -40.6830 144.6900 164.00 94.00 70.00 479209 CGO 2020 07 17 04 03 00 1086-99 G co CCGG 68.720 -999.990 ... AR2 2020 09 02 12 06 37 -40.6830 144.6900 164.00 94.00 70.00 479210 CGO 2020 07 17 04 03 00 4968-99 G co CCGG 68.520 -999.990 ... AR2 2020 09 02 12 21 14 -40.6830 144.6900 164.00 94.00 70.00 479211 CGO 2020 07 20 00 54 00 2932-99 G co CCGG 62.460 -999.990 ... AR2 2020 09 03 15 26 50 -40.6830 144.6900 164.00 94.00 70.00 479344 CGO 2020 07 20 00 54 00 5407-99 G co CCGG 62.570 -999.990 ... AR2 2020 09 03 15 12 26 -40.6830 144.6900 164.00 94.00 70.00 479343 CGO 2020 07 31 04 49 00 2836-99 G co CCGG 76.790 -999.990 .X. AR2 2020 09 03 14 43 35 -40.6830 144.6900 164.00 94.00 70.00 479345 CGO 2020 07 31 04 49 00 4484-99 G co CCGG 76.710 -999.990 .X. AR2 2020 09 03 14 58 02 -40.6830 144.6900 164.00 94.00 70.00 479346 CGO 2020 08 04 05 39 00 4639-99 G co CCGG 64.110 -999.990 ... AR2 2020 10 07 11 08 41 -40.6830 144.6900 164.00 94.00 70.00 480481 CGO 2020 08 04 05 39 00 4640-99 G co CCGG 63.900 -999.990 ... AR2 2020 10 07 11 23 00 -40.6830 144.6900 164.00 94.00 70.00 480482 CGO 2020 08 14 01 25 00 5875-99 G co CCGG 78.470 -999.990 .X. AR2 2020 10 07 11 37 23 -40.6830 144.6900 164.00 94.00 70.00 480479 CGO 2020 08 14 01 25 00 5876-99 G co CCGG 78.830 -999.990 .X. AR2 2020 10 07 11 51 41 -40.6830 144.6900 164.00 94.00 70.00 480480 CGO 2020 08 17 01 08 00 4163-99 G co CCGG 69.750 -999.990 ... AR2 2020 10 07 10 11 28 -40.6830 144.6900 164.00 94.00 70.00 480477 CGO 2020 08 17 01 08 00 4164-99 G co CCGG 69.660 -999.990 ... AR2 2020 10 07 10 25 48 -40.6830 144.6900 164.00 94.00 70.00 480478 CGO 2020 08 24 01 39 00 4973-99 G co CCGG 66.340 -999.990 ... AR2 2020 10 07 10 40 04 -40.6830 144.6900 164.00 94.00 70.00 480475 CGO 2020 08 24 01 39 00 4974-99 G co CCGG 66.220 -999.990 ... AR2 2020 10 07 10 54 21 -40.6830 144.6900 164.00 94.00 70.00 480476 CGO 2020 08 31 00 50 00 3187-99 G co CCGG 67.800 -999.990 ... AR2 2020 11 17 10 55 03 -40.6830 144.6900 164.00 94.00 70.00 482030 CGO 2020 08 31 00 50 00 3188-99 G co CCGG 67.620 -999.990 ... AR2 2020 11 17 11 09 23 -40.6830 144.6900 164.00 94.00 70.00 482031 CGO 2020 09 11 05 01 00 3111-99 G co CCGG 77.720 -999.990 .X. AR2 2020 11 17 10 26 27 -40.6830 144.6900 164.00 94.00 70.00 482032 CGO 2020 09 11 05 01 00 3112-99 G co CCGG 77.490 -999.990 .X. AR2 2020 11 17 10 40 43 -40.6830 144.6900 164.00 94.00 70.00 482033 CGO 2020 09 14 01 59 00 1083-99 G co CCGG 67.870 -999.990 ... AR2 2020 11 13 10 25 36 -40.6830 144.6900 164.00 94.00 70.00 481810 CGO 2020 09 14 01 59 00 1084-99 G co CCGG 68.050 -999.990 ... AR2 2020 11 13 10 39 54 -40.6830 144.6900 164.00 94.00 70.00 481811 CGO 2020 09 23 00 08 00 4117-99 G co CCGG 68.140 -999.990 ... AR2 2020 11 13 09 57 01 -40.6830 144.6900 164.00 94.00 70.00 481808 CGO 2020 09 23 00 08 00 4118-99 G co CCGG 67.990 -999.990 ... AR2 2020 11 13 10 11 18 -40.6830 144.6900 164.00 94.00 70.00 481809 CGO 2020 09 28 03 35 00 4379-99 G co CCGG 71.880 -999.990 ... AR2 2020 11 13 09 28 32 -40.6830 144.6900 164.00 94.00 70.00 481804 CGO 2020 09 28 03 35 00 4380-99 G co CCGG 71.760 -999.990 ... AR2 2020 11 13 09 42 48 -40.6830 144.6900 164.00 94.00 70.00 481805 CGO 2020 10 09 00 04 00 3775-99 G co CCGG 68.980 -999.990 ... AR2 2020 11 12 16 28 31 -40.6830 144.6900 164.00 94.00 70.00 481806 CGO 2020 10 09 00 04 00 3776-99 G co CCGG 69.260 -999.990 ... AR2 2020 11 12 16 42 46 -40.6830 144.6900 164.00 94.00 70.00 481807 CGO 2020 10 16 02 58 00 4901-99 G co CCGG 67.370 -999.990 ... AR2 2020 12 08 09 46 33 -40.6830 144.6900 164.00 94.00 70.00 483035 CGO 2020 10 16 02 58 00 4902-99 G co CCGG 67.590 -999.990 ... AR2 2020 12 08 13 11 53 -40.6830 144.6900 164.00 94.00 70.00 483036 CGO 2020 10 19 03 05 00 261-99 G co CCGG 71.530 -999.990 ... AR2 2020 12 08 13 26 09 -40.6830 144.6900 164.00 94.00 70.00 483037 CGO 2020 10 30 03 45 00 1157-99 G co CCGG 75.270 -999.990 .X. AR2 2020 12 08 16 17 37 -40.6830 144.6900 164.00 94.00 70.00 482985 CGO 2020 10 30 03 45 00 1158-99 G co CCGG 75.120 -999.990 .X. AR2 2020 12 08 16 31 51 -40.6830 144.6900 164.00 94.00 70.00 482986 CGO 2020 11 05 00 51 00 2159-99 G co CCGG 64.340 -999.990 ... AR2 2020 12 09 08 37 21 -40.6830 144.6900 164.00 94.00 70.00 482987 CGO 2020 11 05 00 51 00 2160-99 G co CCGG 64.120 -999.990 ... AR2 2020 12 09 08 51 38 -40.6830 144.6900 164.00 94.00 70.00 482988 CGO 2020 11 13 03 31 00 5725-99 G co CCGG 68.900 -999.990 ... AR2 2020 12 29 11 49 48 -40.6830 144.6900 164.00 94.00 70.00 483798 CGO 2020 11 13 03 31 00 5726-99 G co CCGG 68.890 -999.990 ... AR2 2020 12 29 12 04 07 -40.6830 144.6900 164.00 94.00 70.00 483799 CGO 2020 11 20 01 11 00 2225-99 G co CCGG 64.910 -999.990 ... AR2 2020 12 29 11 21 09 -40.6830 144.6900 164.00 94.00 70.00 483800 CGO 2020 11 20 01 11 00 2226-99 G co CCGG 64.920 -999.990 ... AR2 2020 12 29 11 35 27 -40.6830 144.6900 164.00 94.00 70.00 483801 CGO 2020 11 26 00 24 00 1555-99 G co CCGG 60.080 -999.990 ... AR2 2020 12 28 13 25 52 -40.6830 144.6900 164.00 94.00 70.00 483765 CGO 2020 11 26 00 24 00 1556-99 G co CCGG 60.000 -999.990 ... AR2 2020 12 28 13 40 09 -40.6830 144.6900 164.00 94.00 70.00 483766 CGO 2020 12 02 00 47 00 5129-99 G co CCGG 57.700 -999.990 ... AR2 2020 12 28 13 54 38 -40.6830 144.6900 164.00 94.00 70.00 483763 CGO 2020 12 02 00 47 00 5130-99 G co CCGG 57.680 -999.990 ... AR2 2020 12 28 14 08 55 -40.6830 144.6900 164.00 94.00 70.00 483764 CGO 2020 12 07 00 20 00 3363-99 G co CCGG 57.630 -999.990 ... AR2 2021 03 02 15 11 47 -40.6830 144.6900 164.00 94.00 70.00 486103 CGO 2020 12 07 00 20 00 3364-99 G co CCGG 57.470 -999.990 ... AR2 2021 03 02 15 26 03 -40.6830 144.6900 164.00 94.00 70.00 486104 CGO 2020 12 18 00 11 00 4999-99 G co CCGG 53.060 -999.990 ... AR2 2021 03 02 15 40 19 -40.6830 144.6900 164.00 94.00 70.00 486105 CGO 2020 12 18 00 11 00 5000-99 G co CCGG 53.150 -999.990 ... AR2 2021 03 02 15 54 40 -40.6830 144.6900 164.00 94.00 70.00 486106 CGO 2020 12 22 23 13 00 199-99 G co CCGG 52.560 -999.990 ... AR2 2021 03 05 11 06 01 -40.6830 144.6900 164.00 94.00 70.00 486099 CGO 2020 12 22 23 13 00 200-99 G co CCGG 52.280 -999.990 ... AR2 2021 03 05 11 20 16 -40.6830 144.6900 164.00 94.00 70.00 486100 CGO 2020 12 28 23 53 00 1565-99 G co CCGG 51.790 -999.990 ... AR2 2021 03 04 15 00 47 -40.6830 144.6900 164.00 94.00 70.00 486101 CGO 2020 12 28 23 53 00 1566-99 G co CCGG 51.980 -999.990 ... AR2 2021 03 04 15 15 06 -40.6830 144.6900 164.00 94.00 70.00 486102