# number_of_header_lines: 70 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO CCGG (Individual Flasks) # contact_name: Gabrielle Petron # contact_telephone: (303) 497-4890 # contact_email: Gabrielle.Petron@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Centre des Faibles Radioactivities/TAAF [LSCE] # collaborator_url: www.lsce.cea.fr/ # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: crz # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2020-12-31 # description_creation-time: 2021-07-29 08:17:52 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number CRZ 1991 03 03 06 30 00 101-81 P co CCGG 156.000 -999.990 W.. R4 1992 05 20 17 55 00 -46.4337 51.8478 202.00 197.00 5.00 46698 CRZ 1991 03 03 06 30 00 102-81 P co CCGG 357.270 -999.990 W.C R4 1992 05 20 18 11 00 -46.4337 51.8478 202.00 197.00 5.00 46699 CRZ 1991 03 18 05 42 00 100-81 P co CCGG 327.850 -999.990 W.C R4 1992 05 20 17 39 00 -46.4337 51.8478 202.00 197.00 5.00 46701 CRZ 1991 03 18 05 42 00 99-81 P co CCGG 299.190 -999.990 W.C R4 1992 05 20 17 22 00 -46.4337 51.8478 202.00 197.00 5.00 46700 CRZ 1991 03 23 11 37 00 37-81 P co CCGG -999.990 -999.990 *.. R4 1992 05 20 12 29 00 -46.4337 51.8478 202.00 197.00 5.00 46702 CRZ 1991 03 23 11 37 00 38-81 P co CCGG 332.920 -999.990 W.C R4 1992 05 20 12 46 00 -46.4337 51.8478 202.00 197.00 5.00 46703 CRZ 1991 03 25 09 16 00 629-81 P co CCGG 436.600 -999.990 W.C R4 1992 05 20 13 02 00 -46.4337 51.8478 202.00 197.00 5.00 46704 CRZ 1991 03 25 09 16 00 630-81 P co CCGG 422.290 -999.990 W.C R4 1992 05 20 13 18 00 -46.4337 51.8478 202.00 197.00 5.00 46705 CRZ 1991 04 02 06 12 00 13-81 P co CCGG 392.030 -999.990 W.C R4 1992 05 21 07 37 00 -46.4337 51.8478 202.00 197.00 5.00 46706 CRZ 1991 04 02 06 12 00 14-81 P co CCGG 259.470 -999.990 W.C R4 1992 05 21 07 54 00 -46.4337 51.8478 202.00 197.00 5.00 46707 CRZ 1991 04 04 06 07 00 1027-81 P co CCGG 341.870 -999.990 W.C R4 1992 05 21 07 05 00 -46.4337 51.8478 202.00 197.00 5.00 46708 CRZ 1991 04 04 06 07 00 1028-81 P co CCGG 337.930 -999.990 W.C R4 1992 05 21 07 21 00 -46.4337 51.8478 202.00 197.00 5.00 46709 CRZ 1991 04 25 11 53 00 331-81 P co CCGG 404.470 -999.990 W.C R4 1992 05 21 09 46 00 -46.4337 51.8478 202.00 197.00 5.00 46710 CRZ 1991 04 25 11 53 00 332-81 P co CCGG 438.690 -999.990 W.C R4 1992 05 21 10 02 00 -46.4337 51.8478 202.00 197.00 5.00 46711 CRZ 1991 04 25 12 00 00 1123-81 P co CCGG 159.950 -999.990 W.. R4 1992 05 21 09 13 00 -46.4337 51.8478 202.00 197.00 5.00 46712 CRZ 1991 04 25 12 00 00 1124-81 P co CCGG 231.300 -999.990 W.C R4 1992 05 21 09 29 00 -46.4337 51.8478 202.00 197.00 5.00 46713 CRZ 1991 05 24 05 32 00 941-81 P co CCGG 149.680 -999.990 W.. R4 1992 05 21 08 46 00 -46.4337 51.8478 202.00 197.00 5.00 46714 CRZ 1991 05 24 05 40 00 267-81 P co CCGG 473.930 -999.990 W.C R4 1992 05 21 08 11 00 -46.4337 51.8478 202.00 197.00 5.00 46716 CRZ 1991 05 24 05 40 00 268-81 P co CCGG 295.500 -999.990 W.C R4 1992 05 21 08 30 00 -46.4337 51.8478 202.00 197.00 5.00 46717 CRZ 1991 06 04 10 54 00 827-81 P co CCGG 139.810 -999.990 W.. R4 1992 05 20 14 18 00 -46.4337 51.8478 202.00 197.00 5.00 46718 CRZ 1991 06 04 10 54 00 828-81 P co CCGG 320.550 -999.990 W.C R4 1992 05 20 14 35 00 -46.4337 51.8478 202.00 197.00 5.00 46719 CRZ 1991 06 04 11 00 00 715-81 P co CCGG 80.690 -999.990 W.. R4 1992 05 20 13 34 00 -46.4337 51.8478 202.00 197.00 5.00 46720 CRZ 1991 06 04 11 00 00 716-81 P co CCGG 149.700 -999.990 W.. R4 1992 05 20 13 50 00 -46.4337 51.8478 202.00 197.00 5.00 46721 CRZ 1991 06 12 06 00 00 17-81 P co CCGG 120.920 -999.990 W.. R4 1992 05 20 18 28 00 -46.4337 51.8478 202.00 197.00 5.00 46722 CRZ 1991 06 12 06 00 00 18-81 P co CCGG 80.090 -999.990 W.. R4 1992 05 20 18 45 00 -46.4337 51.8478 202.00 197.00 5.00 46723 CRZ 1991 06 12 06 05 00 1075-81 P co CCGG 285.130 -999.990 W.C R4 1992 05 20 15 59 00 -46.4337 51.8478 202.00 197.00 5.00 46724 CRZ 1991 06 12 06 05 00 1076-81 P co CCGG 326.630 -999.990 W.C R4 1992 05 20 16 16 00 -46.4337 51.8478 202.00 197.00 5.00 46725 CRZ 1991 07 08 10 57 00 615-81 P co CCGG 247.730 -999.990 W.C R4 1992 05 21 10 18 00 -46.4337 51.8478 202.00 197.00 5.00 46726 CRZ 1991 07 08 10 57 00 616-81 P co CCGG 235.630 -999.990 W.C R4 1992 05 21 10 35 00 -46.4337 51.8478 202.00 197.00 5.00 46727 CRZ 1991 07 08 11 04 00 879-81 P co CCGG 123.710 -999.990 W.. R4 1992 05 21 10 52 00 -46.4337 51.8478 202.00 197.00 5.00 46728 CRZ 1991 07 18 09 10 00 787-81 P co CCGG 173.610 -999.990 W.. R4 1992 05 20 15 26 00 -46.4337 51.8478 202.00 197.00 5.00 46730 CRZ 1991 07 18 09 10 00 788-81 P co CCGG 190.450 -999.990 W.. R4 1992 05 20 15 42 00 -46.4337 51.8478 202.00 197.00 5.00 46731 CRZ 1991 07 18 09 18 00 805-81 P co CCGG 183.180 -999.990 W.. R4 1992 05 20 14 52 00 -46.4337 51.8478 202.00 197.00 5.00 46732 CRZ 1991 07 18 09 18 00 806-81 P co CCGG 108.460 -999.990 W.. R4 1992 05 20 15 09 00 -46.4337 51.8478 202.00 197.00 5.00 46733 CRZ 1991 08 11 11 33 00 986-81 P co CCGG 887.050 -999.990 W.C R4 1992 08 25 09 04 00 -46.4337 51.8478 202.00 197.00 5.00 46735 CRZ 1991 08 11 11 40 00 1173-81 P co CCGG 185.520 -999.990 W.. R4 1992 08 25 08 28 00 -46.4337 51.8478 202.00 197.00 5.00 46736 CRZ 1991 08 11 11 40 00 1174-81 P co CCGG 141.240 -999.990 W.. R4 1992 08 25 08 45 00 -46.4337 51.8478 202.00 197.00 5.00 46737 CRZ 1991 08 14 09 50 00 867-81 P co CCGG 267.890 -999.990 W.C R4 1992 08 24 13 45 00 -46.4337 51.8478 202.00 197.00 5.00 46738 CRZ 1991 08 14 09 50 00 868-81 P co CCGG 936.800 -999.990 W.C R4 1992 08 24 14 02 00 -46.4337 51.8478 202.00 197.00 5.00 46739 CRZ 1991 08 14 09 57 00 1141-81 P co CCGG 365.220 -999.990 W.C R4 1992 08 24 13 10 00 -46.4337 51.8478 202.00 197.00 5.00 46740 CRZ 1991 08 14 09 57 00 1142-81 P co CCGG 431.370 -999.990 W.C R4 1992 08 24 13 29 00 -46.4337 51.8478 202.00 197.00 5.00 46741 CRZ 1991 09 02 11 43 00 1271-81 P co CCGG 208.980 -999.990 W.. R4 1992 08 25 11 31 00 -46.4337 51.8478 202.00 197.00 5.00 46742 CRZ 1991 09 02 11 43 00 1272-81 P co CCGG 233.570 -999.990 W.C R4 1992 08 25 11 47 00 -46.4337 51.8478 202.00 197.00 5.00 46743 CRZ 1991 09 02 11 50 00 230-81 P co CCGG 420.650 -999.990 W.C R4 1992 08 25 09 56 00 -46.4337 51.8478 202.00 197.00 5.00 46745 CRZ 1991 09 20 09 45 00 119-81 P co CCGG 361.390 -999.990 W.C R4 1992 08 24 16 50 00 -46.4337 51.8478 202.00 197.00 5.00 46746 CRZ 1991 09 20 09 45 00 120-81 P co CCGG 188.010 -999.990 W.. R4 1992 08 24 17 07 00 -46.4337 51.8478 202.00 197.00 5.00 46747 CRZ 1991 09 20 09 50 00 797-81 P co CCGG 219.840 -999.990 W.. R4 1992 08 24 16 14 00 -46.4337 51.8478 202.00 197.00 5.00 46748 CRZ 1991 09 20 09 50 00 798-81 P co CCGG 334.800 -999.990 W.C R4 1992 08 24 16 32 00 -46.4337 51.8478 202.00 197.00 5.00 46749 CRZ 1991 10 24 11 10 00 577-81 P co CCGG 278.510 -999.990 W.C R4 1992 08 24 14 54 00 -46.4337 51.8478 202.00 197.00 5.00 46750 CRZ 1991 10 24 11 10 00 578-81 P co CCGG 607.420 -999.990 W.C R4 1992 08 24 15 10 00 -46.4337 51.8478 202.00 197.00 5.00 46751 CRZ 1991 10 24 11 17 00 405-81 P co CCGG 220.630 -999.990 W.. R4 1992 08 24 14 19 00 -46.4337 51.8478 202.00 197.00 5.00 46752 CRZ 1991 10 24 11 17 00 406-81 P co CCGG 344.360 -999.990 W.C R4 1992 08 24 14 37 00 -46.4337 51.8478 202.00 197.00 5.00 46753 CRZ 1991 11 27 12 54 00 859-81 P co CCGG 601.980 -999.990 W.C R4 1992 08 24 17 58 00 -46.4337 51.8478 202.00 197.00 5.00 46754 CRZ 1991 11 27 12 54 00 860-81 P co CCGG 287.350 -999.990 W.C R4 1992 08 24 18 14 00 -46.4337 51.8478 202.00 197.00 5.00 46755 CRZ 1991 11 27 13 00 00 1283-81 P co CCGG 320.420 -999.990 W.C R4 1992 08 24 17 24 00 -46.4337 51.8478 202.00 197.00 5.00 46756 CRZ 1991 11 27 13 00 00 1284-81 P co CCGG 251.940 -999.990 W.C R4 1992 08 24 17 41 00 -46.4337 51.8478 202.00 197.00 5.00 46757 CRZ 1992 01 03 09 30 00 741-81 P co CCGG 765.900 -999.990 W.C R4 1992 08 25 12 04 00 -46.4337 51.8478 202.00 197.00 5.00 46758 CRZ 1992 01 03 09 30 00 742-81 P co CCGG 872.160 -999.990 W.C R4 1992 08 25 12 20 00 -46.4337 51.8478 202.00 197.00 5.00 46759 CRZ 1992 01 14 11 15 00 1-81 P co CCGG 103.270 -999.990 W.. R4 1992 08 25 09 20 00 -46.4337 51.8478 202.00 197.00 5.00 46760 CRZ 1992 01 14 11 15 00 2-81 P co CCGG 82.410 -999.990 W.. R4 1992 08 25 09 36 00 -46.4337 51.8478 202.00 197.00 5.00 46761 CRZ 1992 02 06 05 45 00 529-81 P co CCGG 210.700 -999.990 W.. R4 1992 08 25 12 43 00 -46.4337 51.8478 202.00 197.00 5.00 46762 CRZ 1992 02 06 05 45 00 530-81 P co CCGG 721.770 -999.990 W.C R4 1992 08 25 13 00 00 -46.4337 51.8478 202.00 197.00 5.00 46763 CRZ 1992 02 24 06 15 00 1261-81 P co CCGG 67.910 -999.990 W.. R4 1992 08 25 13 16 00 -46.4337 51.8478 202.00 197.00 5.00 46764 CRZ 1992 02 24 06 15 00 1262-81 P co CCGG 95.310 -999.990 W.. R4 1992 08 25 13 32 00 -46.4337 51.8478 202.00 197.00 5.00 46765 CRZ 1992 02 27 10 40 00 1321-81 P co CCGG 78.620 -999.990 W.. R4 1992 08 25 10 25 00 -46.4337 51.8478 202.00 197.00 5.00 46766 CRZ 1992 02 27 10 40 00 1322-81 P co CCGG 70.700 -999.990 W.. R4 1992 08 25 10 41 00 -46.4337 51.8478 202.00 197.00 5.00 46767 CRZ 1992 03 14 06 15 00 425-81 P co CCGG 89.360 -999.990 W.. R4 1992 08 25 10 58 00 -46.4337 51.8478 202.00 197.00 5.00 46768 CRZ 1992 03 14 06 15 00 426-81 P co CCGG 108.900 -999.990 W.. R4 1992 08 25 11 15 00 -46.4337 51.8478 202.00 197.00 5.00 46769 CRZ 1992 03 19 06 00 00 1563-81 P co CCGG 289.940 -999.990 W.C R4 1993 04 22 13 15 00 -46.4337 51.8478 202.00 197.00 5.00 46770 CRZ 1992 03 19 06 00 00 1564-81 P co CCGG -999.990 -999.990 *.. R4 1993 04 22 13 32 00 -46.4337 51.8478 202.00 197.00 5.00 46771 CRZ 1992 04 09 05 30 00 1319-81 P co CCGG 80.370 -999.990 W.. R4 1993 04 22 12 42 00 -46.4337 51.8478 202.00 197.00 5.00 46772 CRZ 1992 04 09 05 30 00 1320-81 P co CCGG 121.050 -999.990 W.. R4 1993 04 22 12 58 00 -46.4337 51.8478 202.00 197.00 5.00 46773 CRZ 1992 04 14 11 30 00 297-81 P co CCGG 145.330 -999.990 W.. R4 1993 04 22 12 08 00 -46.4337 51.8478 202.00 197.00 5.00 46774 CRZ 1992 04 14 11 30 00 298-81 P co CCGG 110.440 -999.990 W.. R4 1993 04 22 12 25 00 -46.4337 51.8478 202.00 197.00 5.00 46775 CRZ 1992 04 28 05 30 00 807-81 P co CCGG 234.230 -999.990 W.C R4 1993 04 22 11 35 00 -46.4337 51.8478 202.00 197.00 5.00 46776 CRZ 1992 04 28 05 30 00 808-81 P co CCGG 461.150 -999.990 W.C R4 1993 04 22 11 51 00 -46.4337 51.8478 202.00 197.00 5.00 46777 CRZ 1992 05 10 05 30 00 1253-81 P co CCGG 154.210 -999.990 W.. R4 1993 04 22 14 35 00 -46.4337 51.8478 202.00 197.00 5.00 46778 CRZ 1992 05 10 05 30 00 1254-81 P co CCGG 386.080 -999.990 W.C R4 1993 04 22 14 52 00 -46.4337 51.8478 202.00 197.00 5.00 46779 CRZ 1992 05 12 05 30 00 367-81 P co CCGG 334.400 -999.990 W.C R4 1993 04 22 15 08 00 -46.4337 51.8478 202.00 197.00 5.00 46780 CRZ 1992 05 12 05 30 00 368-81 P co CCGG 301.100 -999.990 W.C R4 1993 04 22 15 25 00 -46.4337 51.8478 202.00 197.00 5.00 46781 CRZ 1992 06 07 05 45 00 759-81 P co CCGG 234.780 -999.990 W.C R4 1993 04 22 14 01 00 -46.4337 51.8478 202.00 197.00 5.00 46782 CRZ 1992 06 07 05 45 00 760-81 P co CCGG 383.590 -999.990 W.C R4 1993 04 22 14 18 00 -46.4337 51.8478 202.00 197.00 5.00 46783 CRZ 1992 06 20 09 30 00 733-81 P co CCGG 101.470 -999.990 W.. R4 1993 04 22 15 43 00 -46.4337 51.8478 202.00 197.00 5.00 46784 CRZ 1992 06 20 09 30 00 734-81 P co CCGG 96.170 -999.990 W.. R4 1993 04 23 10 23 00 -46.4337 51.8478 202.00 197.00 5.00 46785 CRZ 1992 07 16 10 30 00 129-81 P co CCGG 186.150 -999.990 W.. R4 1993 07 23 12 20 00 -46.4337 51.8478 202.00 197.00 5.00 46786 CRZ 1992 08 20 09 45 00 727-81 P co CCGG 148.450 -999.990 W.. R4 1993 07 26 09 35 00 -46.4337 51.8478 202.00 197.00 5.00 46790 CRZ 1992 08 20 09 45 00 728-81 P co CCGG 173.570 -999.990 W.. R4 1993 07 26 09 51 00 -46.4337 51.8478 202.00 197.00 5.00 46791 CRZ 1992 08 28 06 00 00 1309-81 P co CCGG 94.650 -999.990 W.. R4 1993 07 26 10 09 00 -46.4337 51.8478 202.00 197.00 5.00 46792 CRZ 1992 08 28 06 00 00 1310-81 P co CCGG 100.290 -999.990 W.. R4 1993 07 26 10 26 00 -46.4337 51.8478 202.00 197.00 5.00 46793 CRZ 1992 08 30 11 00 00 1441-81 P co CCGG 102.780 -999.990 W.. R4 1993 07 23 11 25 00 -46.4337 51.8478 202.00 197.00 5.00 46794 CRZ 1992 08 30 11 00 00 1442-81 P co CCGG 181.240 -999.990 W.. R4 1993 07 23 11 43 00 -46.4337 51.8478 202.00 197.00 5.00 46795 CRZ 1992 09 07 11 00 00 431-81 P co CCGG 137.210 -999.990 W.. R4 1993 07 23 12 40 00 -46.4337 51.8478 202.00 197.00 5.00 46796 CRZ 1992 09 07 11 00 00 432-81 P co CCGG 124.310 -999.990 W.. R4 1993 07 23 12 57 00 -46.4337 51.8478 202.00 197.00 5.00 46797 CRZ 1992 09 09 10 00 00 915-81 P co CCGG 242.000 -999.990 W.C R4 1993 07 26 08 45 00 -46.4337 51.8478 202.00 197.00 5.00 46798 CRZ 1992 09 16 09 45 00 792-81 P co CCGG 179.680 -999.990 W.. R4 1993 07 23 12 02 00 -46.4337 51.8478 202.00 197.00 5.00 46801 CRZ 1992 10 08 09 30 00 1151-81 P co CCGG 178.370 -999.990 W.. R4 1993 07 23 14 46 00 -46.4337 51.8478 202.00 197.00 5.00 46802 CRZ 1992 10 08 09 30 00 1152-81 P co CCGG 91.490 -999.990 W.. R4 1993 07 23 15 02 00 -46.4337 51.8478 202.00 197.00 5.00 46803 CRZ 1992 10 25 06 30 00 973-81 P co CCGG 293.510 -999.990 W.C R4 1993 07 23 14 12 00 -46.4337 51.8478 202.00 197.00 5.00 46804 CRZ 1992 10 25 06 30 00 974-81 P co CCGG 421.320 -999.990 W.C R4 1993 07 23 14 29 00 -46.4337 51.8478 202.00 197.00 5.00 46805 CRZ 1992 11 08 11 30 00 127-81 P co CCGG 245.660 -999.990 W.C R4 1994 03 11 13 44 00 -46.4337 51.8478 202.00 197.00 5.00 46806 CRZ 1992 11 08 11 30 00 128-81 P co CCGG 210.510 -999.990 W.. R4 1994 03 11 14 00 00 -46.4337 51.8478 202.00 197.00 5.00 46807 CRZ 1992 12 25 12 50 00 1397-81 P co CCGG 135.960 -999.990 W.. R4 1994 03 11 11 08 00 -46.4337 51.8478 202.00 197.00 5.00 46808 CRZ 1992 12 25 12 50 00 1398-81 P co CCGG 151.240 -999.990 W.. R4 1994 03 11 11 25 00 -46.4337 51.8478 202.00 197.00 5.00 46809 CRZ 1992 12 26 11 10 00 519-81 P co CCGG 187.730 -999.990 W.. R4 1994 03 11 10 35 00 -46.4337 51.8478 202.00 197.00 5.00 46810 CRZ 1992 12 26 11 10 00 520-81 P co CCGG 481.510 -999.990 W.C R4 1994 03 11 10 51 00 -46.4337 51.8478 202.00 197.00 5.00 46811 CRZ 1993 01 02 10 10 00 1001-81 P co CCGG 123.190 -999.990 W.. R4 1994 03 11 11 41 00 -46.4337 51.8478 202.00 197.00 5.00 46812 CRZ 1993 01 02 10 10 00 1002-81 P co CCGG 205.600 -999.990 W.. R4 1994 03 11 11 58 00 -46.4337 51.8478 202.00 197.00 5.00 46813 CRZ 1993 01 12 11 25 00 1215-81 P co CCGG 164.100 -999.990 W.. R4 1994 03 11 10 03 00 -46.4337 51.8478 202.00 197.00 5.00 46814 CRZ 1993 01 12 11 25 00 1216-81 P co CCGG 67.760 -999.990 W.. R4 1994 03 11 10 19 00 -46.4337 51.8478 202.00 197.00 5.00 46815 CRZ 1993 01 25 09 10 00 617-81 P co CCGG 187.610 -999.990 W.. R4 1994 03 14 08 21 00 -46.4337 51.8478 202.00 197.00 5.00 46816 CRZ 1993 01 25 09 10 00 618-81 P co CCGG 167.470 -999.990 W.. R4 1994 03 14 08 37 00 -46.4337 51.8478 202.00 197.00 5.00 46817 CRZ 1993 01 28 12 26 00 631-81 P co CCGG 173.870 -999.990 W.. R4 1994 03 14 08 55 00 -46.4337 51.8478 202.00 197.00 5.00 46818 CRZ 1993 01 28 12 26 00 632-81 P co CCGG 466.400 -999.990 W.C R4 1994 03 14 09 12 00 -46.4337 51.8478 202.00 197.00 5.00 46819 CRZ 1993 02 18 09 00 00 1129-81 P co CCGG 130.010 -999.990 W.. R4 1994 03 11 12 53 00 -46.4337 51.8478 202.00 197.00 5.00 46820 CRZ 1993 02 18 09 00 00 1130-81 P co CCGG 189.320 -999.990 W.. R4 1994 03 11 13 09 00 -46.4337 51.8478 202.00 197.00 5.00 46821 CRZ 1993 02 24 03 40 00 337-81 P co CCGG 113.010 -999.990 W.. R4 1994 03 11 14 57 00 -46.4337 51.8478 202.00 197.00 5.00 46822 CRZ 1993 02 24 03 40 00 338-81 P co CCGG 146.470 -999.990 W.. R4 1994 03 11 15 14 00 -46.4337 51.8478 202.00 197.00 5.00 46823 CRZ 1993 02 26 05 50 00 1191-81 P co CCGG 67.390 -999.990 W.. R4 1994 03 14 10 11 00 -46.4337 51.8478 202.00 197.00 5.00 46824 CRZ 1993 02 26 05 50 00 1192-81 P co CCGG 63.290 -999.990 W.. R4 1994 03 14 10 28 00 -46.4337 51.8478 202.00 197.00 5.00 46825 CRZ 1993 03 02 10 00 00 1185-81 P co CCGG 119.870 -999.990 W.. R4 1994 03 14 10 44 00 -46.4337 51.8478 202.00 197.00 5.00 46826 CRZ 1993 03 02 10 00 00 1186-81 P co CCGG 147.880 -999.990 W.. R4 1994 03 14 11 00 00 -46.4337 51.8478 202.00 197.00 5.00 46827 CRZ 1993 03 10 09 40 00 1517-81 P co CCGG 103.760 -999.990 W.. R4 1994 03 11 13 25 00 -46.4337 51.8478 202.00 197.00 5.00 46828 CRZ 1993 03 30 06 05 00 1059-81 P co CCGG 177.670 -999.990 W.. R4 1994 03 11 12 20 00 -46.4337 51.8478 202.00 197.00 5.00 46830 CRZ 1993 03 30 06 05 00 1060-81 P co CCGG 132.620 -999.990 W.. R4 1994 03 11 12 36 00 -46.4337 51.8478 202.00 197.00 5.00 46831 CRZ 1993 04 10 10 30 00 1399-81 P co CCGG 116.590 -999.990 W.. R4 1994 03 11 15 30 00 -46.4337 51.8478 202.00 197.00 5.00 46832 CRZ 1993 04 10 10 30 00 1400-81 P co CCGG 181.750 -999.990 W.. R4 1994 03 11 15 47 00 -46.4337 51.8478 202.00 197.00 5.00 46833 CRZ 1993 04 13 05 40 00 731-81 P co CCGG 169.540 -999.990 W.. R4 1994 03 14 09 29 00 -46.4337 51.8478 202.00 197.00 5.00 46834 CRZ 1993 04 13 05 40 00 732-81 P co CCGG 152.510 -999.990 W.. R4 1994 03 14 09 45 00 -46.4337 51.8478 202.00 197.00 5.00 46835 CRZ 1993 04 26 12 50 00 708-81 P co CCGG 282.330 -999.990 W.C R4 1994 08 24 15 35 00 -46.4337 51.8478 202.00 197.00 5.00 46837 CRZ 1993 05 24 11 00 00 1259-81 P co CCGG 97.630 -999.990 W.. R4 1994 08 25 09 51 00 -46.4337 51.8478 202.00 197.00 5.00 46840 CRZ 1993 05 24 11 00 00 1260-81 P co CCGG 84.650 -999.990 W.. R4 1994 08 25 10 08 00 -46.4337 51.8478 202.00 197.00 5.00 46841 CRZ 1993 06 09 05 30 00 1317-81 P co CCGG 76.530 -999.990 W.. R4 1994 08 25 11 34 00 -46.4337 51.8478 202.00 197.00 5.00 46842 CRZ 1993 06 09 05 30 00 1318-81 P co CCGG 100.870 -999.990 W.. R4 1994 08 25 11 52 00 -46.4337 51.8478 202.00 197.00 5.00 46843 CRZ 1993 06 11 09 30 00 1225-81 P co CCGG 71.380 -999.990 W.. R4 1994 08 25 10 25 00 -46.4337 51.8478 202.00 197.00 5.00 46844 CRZ 1993 06 11 09 30 00 1226-81 P co CCGG 76.400 -999.990 W.. R4 1994 08 25 10 42 00 -46.4337 51.8478 202.00 197.00 5.00 46845 CRZ 1993 06 17 10 50 00 1279-81 P co CCGG 85.510 -999.990 W.. R4 1994 08 25 10 58 00 -46.4337 51.8478 202.00 197.00 5.00 46846 CRZ 1993 06 17 10 50 00 1280-81 P co CCGG 199.360 -999.990 W.. R4 1994 08 25 11 16 00 -46.4337 51.8478 202.00 197.00 5.00 46847 CRZ 1993 06 24 09 00 00 1193-81 P co CCGG 107.200 -999.990 W.. R4 1994 08 25 12 54 00 -46.4337 51.8478 202.00 197.00 5.00 46848 CRZ 1993 06 24 09 00 00 1194-81 P co CCGG 98.730 -999.990 W.. R4 1994 08 25 13 12 00 -46.4337 51.8478 202.00 197.00 5.00 46849 CRZ 1993 07 16 09 10 00 1217-81 P co CCGG 122.220 -999.990 W.. R4 1994 08 25 12 20 00 -46.4337 51.8478 202.00 197.00 5.00 46850 CRZ 1993 07 16 09 10 00 1218-81 P co CCGG 85.130 -999.990 W.. R4 1994 08 25 12 36 00 -46.4337 51.8478 202.00 197.00 5.00 46851 CRZ 1993 07 19 05 45 00 1219-81 P co CCGG 77.930 -999.990 W.. R4 1994 08 24 15 00 00 -46.4337 51.8478 202.00 197.00 5.00 46852 CRZ 1993 07 19 05 45 00 1220-81 P co CCGG 155.540 -999.990 W.. R4 1994 08 24 15 17 00 -46.4337 51.8478 202.00 197.00 5.00 46853 CRZ 1993 07 31 10 05 00 57-81 P co CCGG 353.310 -999.990 W.C R4 1994 08 24 14 26 00 -46.4337 51.8478 202.00 197.00 5.00 46854 CRZ 1993 07 31 10 05 00 58-81 P co CCGG 397.220 -999.990 W.C R4 1994 08 24 14 43 00 -46.4337 51.8478 202.00 197.00 5.00 46855 CRZ 1993 08 01 06 30 00 56-81 P co CCGG 127.780 -999.990 W.. R4 1994 08 25 15 52 00 -46.4337 51.8478 202.00 197.00 5.00 46857 CRZ 1993 08 06 11 20 00 879-81 P co CCGG 172.420 -999.990 W.. R4 1994 08 25 17 15 00 -46.4337 51.8478 202.00 197.00 5.00 46858 CRZ 1993 08 08 05 30 00 1031-81 P co CCGG 170.500 -999.990 W.. R4 1994 08 25 13 29 00 -46.4337 51.8478 202.00 197.00 5.00 46860 CRZ 1993 08 08 05 30 00 1032-81 P co CCGG 99.710 -999.990 W.. R4 1994 08 25 13 46 00 -46.4337 51.8478 202.00 197.00 5.00 46861 CRZ 1993 08 22 11 00 00 899-81 P co CCGG 114.190 -999.990 W.. R4 1994 08 25 14 03 00 -46.4337 51.8478 202.00 197.00 5.00 46862 CRZ 1993 08 22 11 00 00 900-81 P co CCGG 86.990 -999.990 W.. R4 1994 08 25 14 19 00 -46.4337 51.8478 202.00 197.00 5.00 46863 CRZ 1993 09 10 10 00 00 663-81 P co CCGG 83.100 -999.990 W.. R4 1994 08 25 16 08 00 -46.4337 51.8478 202.00 197.00 5.00 46864 CRZ 1993 09 10 10 00 00 664-81 P co CCGG 108.850 -999.990 W.. R4 1994 08 25 16 25 00 -46.4337 51.8478 202.00 197.00 5.00 46865 CRZ 1993 09 17 12 30 00 451-81 P co CCGG 285.570 -999.990 W.C R4 1994 08 25 15 15 00 -46.4337 51.8478 202.00 197.00 5.00 46866 CRZ 1993 09 17 12 30 00 452-81 P co CCGG 361.440 -999.990 W.C R4 1994 08 25 15 31 00 -46.4337 51.8478 202.00 197.00 5.00 46867 CRZ 1993 09 22 05 30 00 971-81 P co CCGG 78.980 -999.990 W.. R4 1994 12 27 08 43 00 -46.4337 51.8478 202.00 197.00 5.00 46868 CRZ 1993 09 22 05 30 00 972-81 P co CCGG 374.640 -999.990 W.C R4 1994 12 27 08 59 00 -46.4337 51.8478 202.00 197.00 5.00 46869 CRZ 1993 10 03 05 30 00 1153-81 P co CCGG 196.750 -999.990 W.. R4 1994 12 27 10 21 00 -46.4337 51.8478 202.00 197.00 5.00 46870 CRZ 1993 10 03 05 30 00 1154-81 P co CCGG 272.980 -999.990 W.C R4 1994 12 27 10 38 00 -46.4337 51.8478 202.00 197.00 5.00 46871 CRZ 1993 10 11 05 30 00 605-81 P co CCGG 135.690 -999.990 W.. R4 1994 12 28 09 08 00 -46.4337 51.8478 202.00 197.00 5.00 46872 CRZ 1993 10 11 05 30 00 606-81 P co CCGG 228.070 -999.990 W.. R4 1994 12 28 09 24 00 -46.4337 51.8478 202.00 197.00 5.00 46873 CRZ 1993 10 16 05 30 00 897-81 P co CCGG 417.080 -999.990 W.C R4 1994 12 27 15 05 00 -46.4337 51.8478 202.00 197.00 5.00 46874 CRZ 1993 10 16 05 30 00 898-81 P co CCGG 488.020 -999.990 W.C R4 1994 12 27 15 22 00 -46.4337 51.8478 202.00 197.00 5.00 46875 CRZ 1993 11 01 05 30 00 781-81 P co CCGG 232.360 -999.990 W.C R4 1994 12 28 09 43 00 -46.4337 51.8478 202.00 197.00 5.00 46876 CRZ 1993 11 01 05 30 00 782-81 P co CCGG 354.890 -999.990 W.C R4 1994 12 28 09 59 00 -46.4337 51.8478 202.00 197.00 5.00 46877 CRZ 1993 11 12 05 45 00 777-81 P co CCGG 223.450 -999.990 W.. R4 1994 12 28 08 34 00 -46.4337 51.8478 202.00 197.00 5.00 46878 CRZ 1993 11 12 05 45 00 778-81 P co CCGG 678.670 -999.990 W.C R4 1994 12 28 08 51 00 -46.4337 51.8478 202.00 197.00 5.00 46879 CRZ 1993 11 17 05 30 00 1133-81 P co CCGG 81.500 -999.990 W.. R4 1994 12 28 10 51 00 -46.4337 51.8478 202.00 197.00 5.00 46880 CRZ 1993 11 17 05 30 00 1134-81 P co CCGG 247.390 -999.990 W.C R4 1994 12 28 11 09 00 -46.4337 51.8478 202.00 197.00 5.00 46881 CRZ 1993 12 11 11 30 00 1211-81 P co CCGG 78.750 -999.990 W.. R4 1994 12 28 11 25 00 -46.4337 51.8478 202.00 197.00 5.00 46882 CRZ 1993 12 11 11 30 00 1212-81 P co CCGG 100.340 -999.990 W.. R4 1994 12 28 11 42 00 -46.4337 51.8478 202.00 197.00 5.00 46883 CRZ 1994 01 03 11 51 00 1221-81 P co CCGG 232.640 -999.990 W.C R4 1994 12 27 09 48 00 -46.4337 51.8478 202.00 197.00 5.00 46884 CRZ 1994 01 03 11 51 00 1222-81 P co CCGG 188.120 -999.990 W.. R4 1994 12 27 10 05 00 -46.4337 51.8478 202.00 197.00 5.00 46885 CRZ 1994 01 15 04 36 00 173-81 P co CCGG 227.000 -999.990 W.. R4 1994 12 27 09 16 00 -46.4337 51.8478 202.00 197.00 5.00 46886 CRZ 1994 01 15 04 36 00 174-81 P co CCGG 252.390 -999.990 W.C R4 1994 12 27 09 32 00 -46.4337 51.8478 202.00 197.00 5.00 46887 CRZ 1994 01 27 04 47 00 135-81 P co CCGG 189.960 -999.990 W.. R4 1994 12 27 13 51 00 -46.4337 51.8478 202.00 197.00 5.00 46888 CRZ 1994 01 27 04 47 00 136-81 P co CCGG 365.970 -999.990 W.C R4 1994 12 27 14 08 00 -46.4337 51.8478 202.00 197.00 5.00 46889 CRZ 1994 02 11 06 35 00 1247-81 P co CCGG 118.650 -999.990 W.. R4 1994 12 27 11 34 00 -46.4337 51.8478 202.00 197.00 5.00 46890 CRZ 1994 02 11 06 35 00 1248-81 P co CCGG 247.060 -999.990 W.C R4 1994 12 27 11 50 00 -46.4337 51.8478 202.00 197.00 5.00 46891 CRZ 1994 02 22 06 35 00 401-81 P co CCGG -999.990 -999.990 *.. R4 1994 12 27 16 11 00 -46.4337 51.8478 202.00 197.00 5.00 46892 CRZ 1994 02 22 06 35 00 402-81 P co CCGG 459.580 -999.990 W.C R4 1994 12 27 16 27 00 -46.4337 51.8478 202.00 197.00 5.00 46893 CRZ 1994 02 25 06 30 00 19-81 P co CCGG 152.820 -999.990 W.. R4 1994 12 27 12 13 00 -46.4337 51.8478 202.00 197.00 5.00 46894 CRZ 1994 02 25 06 30 00 20-81 P co CCGG 192.220 -999.990 W.. R4 1994 12 27 12 29 00 -46.4337 51.8478 202.00 197.00 5.00 46895 CRZ 1994 03 13 05 55 00 1105-81 P co CCGG 133.950 -999.990 W.. R4 1994 12 27 15 38 00 -46.4337 51.8478 202.00 197.00 5.00 46896 CRZ 1994 03 13 05 55 00 1106-81 P co CCGG 78.730 -999.990 W.. R4 1994 12 27 15 55 00 -46.4337 51.8478 202.00 197.00 5.00 46897 CRZ 1994 03 26 04 37 00 373-81 P co CCGG 136.100 -999.990 W.. R4 1994 12 27 12 46 00 -46.4337 51.8478 202.00 197.00 5.00 46898 CRZ 1994 03 26 04 37 00 374-81 P co CCGG 126.620 -999.990 W.. R4 1994 12 27 13 02 00 -46.4337 51.8478 202.00 197.00 5.00 46899 CRZ 1994 04 05 09 30 00 151-81 P co CCGG 342.480 -999.990 W.C R4 1994 12 27 13 19 00 -46.4337 51.8478 202.00 197.00 5.00 46900 CRZ 1994 04 05 09 30 00 152-81 P co CCGG 609.860 -999.990 W.C R4 1994 12 27 13 35 00 -46.4337 51.8478 202.00 197.00 5.00 46901 CRZ 1994 04 21 05 15 00 81-81 P co CCGG 240.380 -999.990 W.C R4 1995 07 20 09 29 00 -46.4337 51.8478 202.00 197.00 5.00 46902 CRZ 1994 04 21 05 15 00 82-81 P co CCGG 313.340 -999.990 W.C R4 1995 07 20 09 45 00 -46.4337 51.8478 202.00 197.00 5.00 46903 CRZ 1994 05 01 06 50 00 91-81 P co CCGG 138.160 -999.990 W.. R4 1995 07 20 08 56 00 -46.4337 51.8478 202.00 197.00 5.00 46904 CRZ 1994 05 01 06 50 00 92-81 P co CCGG 158.390 -999.990 W.. R4 1995 07 20 09 12 00 -46.4337 51.8478 202.00 197.00 5.00 46905 CRZ 1994 05 07 10 20 00 45-81 P co CCGG 334.060 -999.990 W.C R4 1995 07 19 16 06 00 -46.4337 51.8478 202.00 197.00 5.00 46906 CRZ 1994 05 07 10 20 00 46-81 P co CCGG 410.640 -999.990 W.C R4 1995 07 19 16 22 00 -46.4337 51.8478 202.00 197.00 5.00 46907 CRZ 1994 05 13 06 10 00 129-81 P co CCGG 139.720 -999.990 W.. R4 1995 07 20 10 34 00 -46.4337 51.8478 202.00 197.00 5.00 46908 CRZ 1994 05 13 06 10 00 130-81 P co CCGG 249.600 -999.990 W.C R4 1995 07 20 10 50 00 -46.4337 51.8478 202.00 197.00 5.00 46909 CRZ 1994 06 14 06 55 00 1121-81 P co CCGG 116.060 -999.990 W.. R4 1995 07 20 10 01 00 -46.4337 51.8478 202.00 197.00 5.00 46910 CRZ 1994 06 14 06 55 00 1122-81 P co CCGG 173.290 -999.990 W.. R4 1995 07 20 10 18 00 -46.4337 51.8478 202.00 197.00 5.00 46911 CRZ 1994 06 29 06 30 00 4-81 P co CCGG -999.990 -999.990 *.. R4 1995 07 20 11 52 00 -46.4337 51.8478 202.00 197.00 5.00 46912 CRZ 1994 07 09 09 30 00 1377-81 P co CCGG 186.540 -999.990 W.. R4 1995 07 20 11 17 00 -46.4337 51.8478 202.00 197.00 5.00 46913 CRZ 1994 07 09 09 30 00 1378-81 P co CCGG 89.240 -999.990 W.. R4 1995 07 20 11 34 00 -46.4337 51.8478 202.00 197.00 5.00 46914 CRZ 1994 07 20 11 40 00 1301-81 P co CCGG 150.110 -999.990 W.. R4 1995 07 19 13 51 00 -46.4337 51.8478 202.00 197.00 5.00 46915 CRZ 1994 07 20 11 40 00 1302-81 P co CCGG 376.270 -999.990 W.C R4 1995 07 19 14 09 00 -46.4337 51.8478 202.00 197.00 5.00 46916 CRZ 1994 08 03 05 30 00 199-81 P co CCGG 160.810 -999.990 W.. R4 1995 07 19 15 30 00 -46.4337 51.8478 202.00 197.00 5.00 46917 CRZ 1994 08 03 05 30 00 200-81 P co CCGG 253.360 -999.990 W.C R4 1995 07 19 15 46 00 -46.4337 51.8478 202.00 197.00 5.00 46918 CRZ 1994 08 21 05 30 00 503-81 P co CCGG 163.960 -999.990 W.. R4 1995 07 19 12 36 00 -46.4337 51.8478 202.00 197.00 5.00 46919 CRZ 1994 08 21 05 30 00 504-81 P co CCGG 142.220 -999.990 W.. R4 1995 07 19 12 54 00 -46.4337 51.8478 202.00 197.00 5.00 46920 CRZ 1994 09 01 06 25 00 243-81 P co CCGG 161.160 -999.990 W.. R4 1995 07 19 12 17 00 -46.4337 51.8478 202.00 197.00 5.00 46921 CRZ 1994 09 06 09 25 00 733-81 P co CCGG 195.100 -999.990 W.. R4 1995 07 19 14 25 00 -46.4337 51.8478 202.00 197.00 5.00 46923 CRZ 1994 09 06 09 25 00 734-81 P co CCGG 137.170 -999.990 W.. R4 1995 07 19 14 41 00 -46.4337 51.8478 202.00 197.00 5.00 46924 CRZ 1994 09 29 10 35 00 1161-81 P co CCGG 216.620 -999.990 W.. R4 1995 07 19 14 57 00 -46.4337 51.8478 202.00 197.00 5.00 46925 CRZ 1994 09 29 10 35 00 1162-81 P co CCGG 247.160 -999.990 W.C R4 1995 07 19 15 14 00 -46.4337 51.8478 202.00 197.00 5.00 46926 CRZ 1994 10 12 13 32 00 1163-81 P co CCGG 78.050 -999.990 W.. R4 1995 07 18 15 58 00 -46.4337 51.8478 202.00 197.00 5.00 46927 CRZ 1994 10 12 13 32 00 1164-81 P co CCGG 91.280 -999.990 W.. R4 1995 07 18 16 14 00 -46.4337 51.8478 202.00 197.00 5.00 46928 CRZ 1994 10 26 05 30 00 647-81 P co CCGG 108.900 -999.990 W.. R4 1995 07 19 11 44 00 -46.4337 51.8478 202.00 197.00 5.00 46929 CRZ 1994 10 26 05 30 00 648-81 P co CCGG 99.650 -999.990 W.. R4 1995 07 19 12 01 00 -46.4337 51.8478 202.00 197.00 5.00 46930 CRZ 1994 11 02 10 40 00 847-81 P co CCGG 141.180 -999.990 W.. R4 1995 07 18 16 32 00 -46.4337 51.8478 202.00 197.00 5.00 46931 CRZ 1994 11 02 10 40 00 848-81 P co CCGG 120.710 -999.990 W.. R4 1995 07 18 16 50 00 -46.4337 51.8478 202.00 197.00 5.00 46932 CRZ 1994 12 15 09 15 00 445-81 P co CCGG 196.330 -999.990 W.. R4 1995 07 18 13 28 00 -46.4337 51.8478 202.00 197.00 5.00 46933 CRZ 1994 12 26 05 43 00 1048-81 P co CCGG 340.460 -999.990 W.C R4 1995 07 19 13 29 00 -46.4337 51.8478 202.00 197.00 5.00 46934 CRZ 1995 01 05 06 20 00 1139-91 P co CCGG 46.780 -999.990 ... R4 1995 07 14 11 42 00 -46.4337 51.8478 202.00 197.00 5.00 46935 CRZ 1995 01 05 06 20 00 1140-91 P co CCGG 46.240 -999.990 ... R4 1995 07 14 11 58 00 -46.4337 51.8478 202.00 197.00 5.00 46936 CRZ 1995 01 05 13 40 00 1526-81 P co CCGG -999.990 -999.990 *.. R4 1995 07 18 13 45 00 -46.4337 51.8478 202.00 197.00 5.00 46937 CRZ 1995 01 12 11 45 00 1135-91 P co CCGG 58.040 -999.990 P.. R4 1995 07 14 08 54 00 -46.4337 51.8478 202.00 197.00 5.00 46938 CRZ 1995 01 12 11 45 00 1136-91 P co CCGG 53.190 -999.990 P.. R4 1995 07 14 09 10 00 -46.4337 51.8478 202.00 197.00 5.00 46939 CRZ 1995 01 22 09 40 00 1131-91 P co CCGG 50.210 -999.990 ... R4 1995 07 13 12 44 00 -46.4337 51.8478 202.00 197.00 5.00 46940 CRZ 1995 01 22 09 40 00 1132-91 P co CCGG 49.270 -999.990 ... R4 1995 07 13 13 01 00 -46.4337 51.8478 202.00 197.00 5.00 46941 CRZ 1995 01 29 04 30 00 1147-91 P co CCGG -999.990 -999.990 *.. R4 1995 07 13 12 12 00 -46.4337 51.8478 202.00 197.00 5.00 46942 CRZ 1995 01 29 04 30 00 1148-91 P co CCGG 46.730 -999.990 ... R4 1995 07 13 12 28 00 -46.4337 51.8478 202.00 197.00 5.00 46943 CRZ 1995 02 09 04 36 00 1151-91 P co CCGG 46.140 -999.990 ... R4 1995 07 13 13 17 00 -46.4337 51.8478 202.00 197.00 5.00 46944 CRZ 1995 02 09 04 36 00 1152-91 P co CCGG 46.090 -999.990 ... R4 1995 07 13 13 33 00 -46.4337 51.8478 202.00 197.00 5.00 46945 CRZ 1995 02 15 06 45 00 1157-91 P co CCGG -999.990 -999.990 *.. R4 1995 07 13 13 49 00 -46.4337 51.8478 202.00 197.00 5.00 46946 CRZ 1995 02 15 06 45 00 1158-91 P co CCGG 47.670 -999.990 ... R4 1995 07 13 14 06 00 -46.4337 51.8478 202.00 197.00 5.00 46947 CRZ 1995 02 25 05 45 00 1159-91 P co CCGG 43.900 -999.990 ... R4 1995 07 14 09 27 00 -46.4337 51.8478 202.00 197.00 5.00 46948 CRZ 1995 02 25 05 45 00 1160-91 P co CCGG 43.530 -999.990 ... R4 1995 07 14 09 43 00 -46.4337 51.8478 202.00 197.00 5.00 46949 CRZ 1995 03 01 10 00 00 1119-91 P co CCGG 45.810 -999.990 ... R4 1995 07 14 09 59 00 -46.4337 51.8478 202.00 197.00 5.00 46950 CRZ 1995 03 01 10 00 00 1120-91 P co CCGG 46.300 -999.990 ... R4 1995 07 14 10 15 00 -46.4337 51.8478 202.00 197.00 5.00 46951 CRZ 1995 03 05 05 00 00 1521-81 P co CCGG 73.600 -999.990 W.. R4 1995 07 18 14 19 00 -46.4337 51.8478 202.00 197.00 5.00 46952 CRZ 1995 03 19 05 10 00 1145-91 P co CCGG 47.820 -999.990 ... R7 1996 05 01 15 17 00 -46.4337 51.8478 202.00 197.00 5.00 46953 CRZ 1995 03 23 11 00 00 1123-91 P co CCGG 49.280 -999.990 P.. R7 1996 05 01 14 44 00 -46.4337 51.8478 202.00 197.00 5.00 46955 CRZ 1995 03 23 11 00 00 1124-91 P co CCGG 55.810 -999.990 P.. R7 1996 05 01 15 00 00 -46.4337 51.8478 202.00 197.00 5.00 46956 CRZ 1995 03 30 09 00 00 1-81 P co CCGG 149.500 -999.990 W.. R7 1996 05 02 15 39 00 -46.4337 51.8478 202.00 197.00 5.00 46957 CRZ 1995 03 30 09 00 00 2-81 P co CCGG 82.920 -999.990 W.. R7 1996 05 02 15 57 00 -46.4337 51.8478 202.00 197.00 5.00 46958 CRZ 1995 04 05 05 32 00 1141-91 P co CCGG 50.560 -999.990 ... R7 1996 05 01 15 33 00 -46.4337 51.8478 202.00 197.00 5.00 46959 CRZ 1995 04 05 05 32 00 1142-91 P co CCGG 48.540 -999.990 ... R7 1996 05 01 15 50 00 -46.4337 51.8478 202.00 197.00 5.00 46960 CRZ 1995 04 13 06 00 00 1523-81 P co CCGG 359.710 -999.990 W.C R7 1996 05 02 14 12 00 -46.4337 51.8478 202.00 197.00 5.00 46961 CRZ 1995 04 26 11 00 00 1537-81 P co CCGG 142.870 -999.990 W.. R7 1996 05 02 15 06 00 -46.4337 51.8478 202.00 197.00 5.00 46963 CRZ 1995 04 26 11 00 00 1538-81 P co CCGG 117.490 -999.990 W.. R7 1996 05 02 15 23 00 -46.4337 51.8478 202.00 197.00 5.00 46964 CRZ 1995 05 12 06 00 00 1117-91 P co CCGG 54.740 -999.990 ... R7 1996 05 02 12 18 00 -46.4337 51.8478 202.00 197.00 5.00 46965 CRZ 1995 05 12 06 00 00 1118-91 P co CCGG 53.090 -999.990 ... R7 1996 05 02 12 34 00 -46.4337 51.8478 202.00 197.00 5.00 46966 CRZ 1995 05 24 06 20 00 197-81 P co CCGG 119.310 -999.990 W.. R7 1996 05 02 18 05 00 -46.4337 51.8478 202.00 197.00 5.00 46967 CRZ 1995 05 24 06 20 00 198-81 P co CCGG 171.060 -999.990 W.. R7 1996 05 02 18 23 00 -46.4337 51.8478 202.00 197.00 5.00 46968 CRZ 1995 05 31 11 45 00 1144-91 P co CCGG 53.560 -999.990 ... R7 1996 05 03 15 06 00 -46.4337 51.8478 202.00 197.00 5.00 46969 CRZ 1995 06 07 06 00 00 1533-81 P co CCGG 97.680 -999.990 W.. R7 1996 05 02 14 31 00 -46.4337 51.8478 202.00 197.00 5.00 46970 CRZ 1995 06 07 06 00 00 1534-81 P co CCGG 81.660 -999.990 W.. R7 1996 05 02 14 49 00 -46.4337 51.8478 202.00 197.00 5.00 46971 CRZ 1995 06 15 06 00 00 1153-91 P co CCGG 55.210 -999.990 ... R7 1996 05 02 12 50 00 -46.4337 51.8478 202.00 197.00 5.00 46972 CRZ 1995 06 15 06 00 00 1154-91 P co CCGG 54.300 -999.990 ... R7 1996 05 02 13 06 00 -46.4337 51.8478 202.00 197.00 5.00 46973 CRZ 1995 06 24 12 00 00 785-81 P co CCGG 106.330 -999.990 W.. R7 1996 05 02 16 23 00 -46.4337 51.8478 202.00 197.00 5.00 46974 CRZ 1995 06 24 12 00 00 786-81 P co CCGG 147.990 -999.990 W.. R7 1996 05 02 16 42 00 -46.4337 51.8478 202.00 197.00 5.00 46975 CRZ 1995 06 29 09 00 00 1155-91 P co CCGG 57.380 -999.990 ... R7 1996 05 02 13 23 00 -46.4337 51.8478 202.00 197.00 5.00 46976 CRZ 1995 06 29 09 00 00 1156-91 P co CCGG 57.250 -999.990 ... R7 1996 05 02 13 39 00 -46.4337 51.8478 202.00 197.00 5.00 46977 CRZ 1995 07 06 10 00 00 643-81 P co CCGG 428.960 -999.990 W.C R7 1996 05 02 16 58 00 -46.4337 51.8478 202.00 197.00 5.00 46978 CRZ 1995 07 06 10 00 00 644-81 P co CCGG 210.390 -999.990 W.. R7 1996 05 02 17 14 00 -46.4337 51.8478 202.00 197.00 5.00 46979 CRZ 1995 07 13 09 30 00 1116-91 P co CCGG 59.550 -999.990 ... R7 1996 05 02 11 45 00 -46.4337 51.8478 202.00 197.00 5.00 46980 CRZ 1995 07 13 09 30 00 1150-91 P co CCGG 58.920 -999.990 ... R7 1996 05 02 12 01 00 -46.4337 51.8478 202.00 197.00 5.00 46981 CRZ 1995 07 21 09 45 00 593-81 P co CCGG 147.020 -999.990 W.. R7 1996 05 01 11 43 00 -46.4337 51.8478 202.00 197.00 5.00 46982 CRZ 1995 07 21 09 45 00 594-81 P co CCGG 263.860 -999.990 W.C R7 1996 05 01 12 00 00 -46.4337 51.8478 202.00 197.00 5.00 46983 CRZ 1995 07 26 11 45 00 1115-91 P co CCGG 61.890 -999.990 ... R7 1996 05 01 08 53 00 -46.4337 51.8478 202.00 197.00 5.00 46984 CRZ 1995 07 26 11 45 00 1149-91 P co CCGG 61.840 -999.990 ... R7 1996 05 01 09 10 00 -46.4337 51.8478 202.00 197.00 5.00 46985 CRZ 1995 08 02 05 31 00 1129-91 P co CCGG 60.500 -999.990 ... R7 1996 05 01 09 26 00 -46.4337 51.8478 202.00 197.00 5.00 46986 CRZ 1995 08 02 05 31 00 1130-91 P co CCGG 61.710 -999.990 ... R7 1996 05 01 09 42 00 -46.4337 51.8478 202.00 197.00 5.00 46987 CRZ 1995 08 14 09 15 00 849-81 P co CCGG 156.870 -999.990 W.. R7 1996 05 01 10 52 00 -46.4337 51.8478 202.00 197.00 5.00 46988 CRZ 1995 08 14 09 15 00 850-81 P co CCGG 220.800 -999.990 W.. R7 1996 05 01 11 08 00 -46.4337 51.8478 202.00 197.00 5.00 46989 CRZ 1995 08 21 10 30 00 1113-91 P co CCGG 65.500 -999.990 ... R7 1996 05 03 09 08 00 -46.4337 51.8478 202.00 197.00 5.00 46990 CRZ 1995 08 21 10 30 00 1114-91 P co CCGG 67.690 -999.990 ... R7 1996 05 03 09 25 00 -46.4337 51.8478 202.00 197.00 5.00 46991 CRZ 1995 08 30 06 40 00 87-81 P co CCGG 127.320 -999.990 W.. R7 1996 05 01 11 25 00 -46.4337 51.8478 202.00 197.00 5.00 46992 CRZ 1995 09 07 09 50 00 1137-91 P co CCGG 71.850 -999.990 ... R7 1996 05 03 09 41 00 -46.4337 51.8478 202.00 197.00 5.00 46994 CRZ 1995 09 07 09 50 00 1138-91 P co CCGG 71.830 -999.990 ... R7 1996 05 03 09 57 00 -46.4337 51.8478 202.00 197.00 5.00 46995 CRZ 1995 09 21 10 04 00 845-81 P co CCGG 127.340 -999.990 W.. R7 1996 05 01 12 37 00 -46.4337 51.8478 202.00 197.00 5.00 46998 CRZ 1995 09 21 10 04 00 846-81 P co CCGG 145.760 -999.990 W.. R7 1996 05 01 12 53 00 -46.4337 51.8478 202.00 197.00 5.00 46999 CRZ 1995 09 27 05 45 00 1128-91 P co CCGG 71.050 -999.990 ... R7 1996 05 01 09 59 00 -46.4337 51.8478 202.00 197.00 5.00 47001 CRZ 1995 10 05 06 00 00 1509-81 P co CCGG 99.050 -999.990 W.. R7 1996 05 01 14 15 00 -46.4337 51.8478 202.00 197.00 5.00 47002 CRZ 1995 10 14 11 52 00 21-81 P co CCGG 115.640 -999.990 W.. R7 1996 05 01 13 42 00 -46.4337 51.8478 202.00 197.00 5.00 47004 CRZ 1995 10 14 11 52 00 22-81 P co CCGG 136.440 -999.990 W.. R7 1996 05 01 13 59 00 -46.4337 51.8478 202.00 197.00 5.00 47005 CRZ 1995 10 18 08 45 00 1125-91 P co CCGG 72.540 -999.990 ... R7 1996 05 03 08 36 00 -46.4337 51.8478 202.00 197.00 5.00 47006 CRZ 1995 10 18 08 45 00 1126-91 P co CCGG 72.340 -999.990 ... R7 1996 05 03 08 52 00 -46.4337 51.8478 202.00 197.00 5.00 47007 CRZ 1995 10 31 11 16 00 585-81 P co CCGG 123.180 -999.990 W.. R7 1996 05 15 12 53 00 -46.4337 51.8478 202.00 197.00 5.00 47008 CRZ 1995 10 31 11 16 00 586-81 P co CCGG 124.470 -999.990 W.. R7 1996 05 15 13 09 00 -46.4337 51.8478 202.00 197.00 5.00 47009 CRZ 1995 11 07 06 10 00 1195-81 P co CCGG 252.410 -999.990 W.C R7 1996 05 15 13 59 00 -46.4337 51.8478 202.00 197.00 5.00 47010 CRZ 1995 11 07 06 10 00 1196-81 P co CCGG 92.020 -999.990 W.. R7 1996 05 15 14 15 00 -46.4337 51.8478 202.00 197.00 5.00 47011 CRZ 1995 11 10 04 45 00 1133-91 P co CCGG 71.810 -999.990 ... R7 1996 05 03 10 14 00 -46.4337 51.8478 202.00 197.00 5.00 47012 CRZ 1995 11 10 04 45 00 1134-91 P co CCGG 70.910 -999.990 ... R7 1996 05 03 10 30 00 -46.4337 51.8478 202.00 197.00 5.00 47013 CRZ 1995 11 20 10 00 00 752-81 P co CCGG 120.050 -999.990 W.. R7 1996 05 15 18 15 00 -46.4337 51.8478 202.00 197.00 5.00 47015 CRZ 1995 11 29 10 00 00 25-81 P co CCGG 110.360 -999.990 W.. R7 1996 05 15 17 41 00 -46.4337 51.8478 202.00 197.00 5.00 47016 CRZ 1995 11 29 10 00 00 26-81 P co CCGG 133.050 -999.990 W.. R7 1996 05 15 17 57 00 -46.4337 51.8478 202.00 197.00 5.00 47017 CRZ 1995 12 07 10 00 00 1115-81 P co CCGG 167.170 -999.990 W.. R7 1996 05 15 14 32 00 -46.4337 51.8478 202.00 197.00 5.00 47018 CRZ 1995 12 07 10 00 00 1116-81 P co CCGG 177.610 -999.990 W.. R7 1996 05 15 14 48 00 -46.4337 51.8478 202.00 197.00 5.00 47019 CRZ 1995 12 14 10 50 00 745-81 P co CCGG 178.540 -999.990 W.. R7 1996 05 15 18 32 00 -46.4337 51.8478 202.00 197.00 5.00 47020 CRZ 1995 12 14 10 50 00 746-81 P co CCGG 119.750 -999.990 W.. R7 1996 05 15 18 50 00 -46.4337 51.8478 202.00 197.00 5.00 47021 CRZ 1995 12 18 05 30 00 209-81 P co CCGG 464.000 -999.990 W.C R7 1996 05 15 17 08 00 -46.4337 51.8478 202.00 197.00 5.00 47022 CRZ 1995 12 18 05 30 00 210-81 P co CCGG 287.760 -999.990 W.C R7 1996 05 15 17 25 00 -46.4337 51.8478 202.00 197.00 5.00 47023 CRZ 1996 01 07 10 40 00 285-81 P co CCGG 109.950 -999.990 W.. R7 1996 05 15 15 56 00 -46.4337 51.8478 202.00 197.00 5.00 47024 CRZ 1996 01 07 10 40 00 286-81 P co CCGG 132.580 -999.990 W.. R7 1996 05 15 16 12 00 -46.4337 51.8478 202.00 197.00 5.00 47025 CRZ 1996 01 10 05 40 00 1045-81 P co CCGG 237.300 -999.990 W.C R7 1996 05 15 13 25 00 -46.4337 51.8478 202.00 197.00 5.00 47026 CRZ 1996 01 10 05 40 00 1046-81 P co CCGG 435.150 -999.990 W.C R7 1996 05 15 13 43 00 -46.4337 51.8478 202.00 197.00 5.00 47027 CRZ 1996 01 18 10 53 00 99-81 P co CCGG 347.380 -999.990 W.C R7 1996 08 01 10 11 00 -46.4337 51.8478 202.00 197.00 5.00 47028 CRZ 1996 01 26 10 20 00 17-81 P co CCGG 83.780 -999.990 W.. R7 1996 08 01 09 39 00 -46.4337 51.8478 202.00 197.00 5.00 47030 CRZ 1996 01 26 10 20 00 18-81 P co CCGG 79.550 -999.990 W.. R7 1996 08 01 09 55 00 -46.4337 51.8478 202.00 197.00 5.00 47031 CRZ 1996 02 07 06 35 00 1589-91 P co CCGG 53.930 -999.990 ... R7 1996 08 05 13 30 00 -46.4337 51.8478 202.00 197.00 5.00 47032 CRZ 1996 02 07 06 35 00 1590-91 P co CCGG 52.780 -999.990 ... R7 1996 08 05 13 46 00 -46.4337 51.8478 202.00 197.00 5.00 47033 CRZ 1996 02 16 09 30 00 1591-91 P co CCGG 48.370 -999.990 ... R7 1996 08 05 11 53 00 -46.4337 51.8478 202.00 197.00 5.00 47034 CRZ 1996 02 16 09 30 00 1592-91 P co CCGG 47.880 -999.990 ... R7 1996 08 05 12 09 00 -46.4337 51.8478 202.00 197.00 5.00 47035 CRZ 1996 02 21 05 40 00 1587-91 P co CCGG 63.090 -999.990 P.. R7 1996 08 05 11 15 00 -46.4337 51.8478 202.00 197.00 5.00 47036 CRZ 1996 02 21 05 40 00 1588-91 P co CCGG 58.370 -999.990 P.. R7 1996 08 05 11 31 00 -46.4337 51.8478 202.00 197.00 5.00 47037 CRZ 1996 02 29 11 35 00 1375-91 P co CCGG 46.920 -999.990 ... R7 1996 08 05 10 44 00 -46.4337 51.8478 202.00 197.00 5.00 47038 CRZ 1996 02 29 11 35 00 1376-91 P co CCGG 46.430 -999.990 ... R7 1996 08 05 10 59 00 -46.4337 51.8478 202.00 197.00 5.00 47039 CRZ 1996 03 07 05 11 00 1471-91 P co CCGG 48.820 -999.990 ... R7 1996 08 05 14 07 00 -46.4337 51.8478 202.00 197.00 5.00 47040 CRZ 1996 03 14 09 13 00 1469-91 P co CCGG 49.100 -999.990 ... R7 1996 08 05 12 25 00 -46.4337 51.8478 202.00 197.00 5.00 47042 CRZ 1996 03 14 09 13 00 1470-91 P co CCGG 49.560 -999.990 ... R7 1996 08 05 12 41 00 -46.4337 51.8478 202.00 197.00 5.00 47043 CRZ 1996 03 23 04 29 00 761-91 P co CCGG 93.360 -999.990 P.. R7 1996 08 05 15 00 00 -46.4337 51.8478 202.00 197.00 5.00 47044 CRZ 1996 03 23 04 29 00 762-91 P co CCGG 45.680 -999.990 P.. R7 1996 08 05 15 16 00 -46.4337 51.8478 202.00 197.00 5.00 47045 CRZ 1996 03 27 09 20 00 757-91 P co CCGG 52.080 -999.990 ... R7 1996 08 05 15 32 00 -46.4337 51.8478 202.00 197.00 5.00 47046 CRZ 1996 03 27 09 20 00 758-91 P co CCGG 49.910 -999.990 ... R7 1996 08 05 15 48 00 -46.4337 51.8478 202.00 197.00 5.00 47047 CRZ 1996 04 03 10 45 00 1593-91 P co CCGG 47.570 -999.990 ... R7 1996 09 20 12 51 00 -46.4337 51.8478 202.00 197.00 5.00 47048 CRZ 1996 04 03 10 45 00 1594-91 P co CCGG 46.860 -999.990 ... R7 1996 09 20 13 07 00 -46.4337 51.8478 202.00 197.00 5.00 47049 CRZ 1996 04 11 06 00 00 1485-91 P co CCGG 48.380 -999.990 ... R7 1996 09 23 08 12 00 -46.4337 51.8478 202.00 197.00 5.00 47050 CRZ 1996 04 11 06 00 00 1486-91 P co CCGG 50.120 -999.990 ... R7 1996 09 23 08 28 00 -46.4337 51.8478 202.00 197.00 5.00 47051 CRZ 1996 04 18 11 30 00 1475-91 P co CCGG 47.420 -999.990 ... R7 1996 09 23 08 44 00 -46.4337 51.8478 202.00 197.00 5.00 47052 CRZ 1996 04 18 11 30 00 1476-91 P co CCGG 46.550 -999.990 ... R7 1996 09 23 09 00 00 -46.4337 51.8478 202.00 197.00 5.00 47053 CRZ 1996 04 26 10 50 00 139-91 P co CCGG 49.360 -999.990 ... R7 1996 09 23 09 16 00 -46.4337 51.8478 202.00 197.00 5.00 47054 CRZ 1996 04 26 10 50 00 140-91 P co CCGG 48.860 -999.990 ... R7 1996 09 23 09 32 00 -46.4337 51.8478 202.00 197.00 5.00 47055 CRZ 1996 05 03 05 50 00 531-91 P co CCGG 51.690 -999.990 ... R7 1996 09 23 07 40 00 -46.4337 51.8478 202.00 197.00 5.00 47056 CRZ 1996 05 03 05 50 00 532-91 P co CCGG 50.200 -999.990 ... R7 1996 09 23 07 56 00 -46.4337 51.8478 202.00 197.00 5.00 47057 CRZ 1996 05 11 05 30 00 1493-91 P co CCGG 51.310 -999.990 ... R7 1996 09 23 09 54 00 -46.4337 51.8478 202.00 197.00 5.00 47058 CRZ 1996 05 11 05 30 00 1494-91 P co CCGG 49.330 -999.990 ... R7 1996 09 23 10 09 00 -46.4337 51.8478 202.00 197.00 5.00 47059 CRZ 1996 05 14 10 05 00 381-91 P co CCGG 50.500 -999.990 ... R7 1996 09 23 10 58 00 -46.4337 51.8478 202.00 197.00 5.00 47060 CRZ 1996 05 14 10 05 00 382-91 P co CCGG 50.990 -999.990 ... R7 1996 09 23 11 13 00 -46.4337 51.8478 202.00 197.00 5.00 47061 CRZ 1996 05 24 10 30 00 229-91 P co CCGG 54.630 -999.990 ... R7 1996 09 20 12 19 00 -46.4337 51.8478 202.00 197.00 5.00 47062 CRZ 1996 05 24 10 30 00 230-91 P co CCGG 52.530 -999.990 ... R7 1996 09 20 12 35 00 -46.4337 51.8478 202.00 197.00 5.00 47063 CRZ 1996 05 29 12 00 00 1599-91 P co CCGG 50.980 -999.990 ... R7 1997 03 28 11 14 00 -46.4337 51.8478 202.00 197.00 5.00 47064 CRZ 1996 05 29 12 00 00 1600-91 P co CCGG 50.960 -999.990 ... R7 1997 03 28 11 32 00 -46.4337 51.8478 202.00 197.00 5.00 47065 CRZ 1996 07 05 10 30 00 1597-91 P co CCGG 63.850 -999.990 ... R7 1997 03 27 14 56 00 -46.4337 51.8478 202.00 197.00 5.00 47066 CRZ 1996 07 05 10 30 00 1598-91 P co CCGG 62.530 -999.990 ... R7 1997 03 27 15 12 00 -46.4337 51.8478 202.00 197.00 5.00 47067 CRZ 1996 07 17 10 40 00 1595-91 P co CCGG 55.570 -999.990 ... R7 1997 03 28 12 53 00 -46.4337 51.8478 202.00 197.00 5.00 47068 CRZ 1996 08 08 10 25 00 1481-91 P co CCGG 59.290 -999.990 ... R7 1997 03 27 16 00 00 -46.4337 51.8478 202.00 197.00 5.00 47069 CRZ 1996 08 27 11 10 00 755-91 P co CCGG 62.440 -999.990 ... R7 1997 03 27 14 24 00 -46.4337 51.8478 202.00 197.00 5.00 47071 CRZ 1996 08 27 11 10 00 756-91 P co CCGG 61.400 -999.990 ... R7 1997 03 27 14 40 00 -46.4337 51.8478 202.00 197.00 5.00 47072 CRZ 1996 09 20 09 55 00 1467-91 P co CCGG 60.860 -999.990 ... R7 1997 03 27 12 38 00 -46.4337 51.8478 202.00 197.00 5.00 47073 CRZ 1996 09 20 09 55 00 1468-91 P co CCGG 63.170 -999.990 ... R7 1997 03 27 12 54 00 -46.4337 51.8478 202.00 197.00 5.00 47074 CRZ 1996 10 09 09 20 00 1601-91 P co CCGG 63.970 -999.990 ... R7 1997 03 27 13 10 00 -46.4337 51.8478 202.00 197.00 5.00 47075 CRZ 1996 10 09 09 20 00 1602-91 P co CCGG 64.050 -999.990 ... R7 1997 03 27 13 26 00 -46.4337 51.8478 202.00 197.00 5.00 47076 CRZ 1996 10 29 06 27 00 309-91 P co CCGG 65.770 -999.990 ... R7 1997 03 28 12 21 00 -46.4337 51.8478 202.00 197.00 5.00 47077 CRZ 1996 10 29 06 27 00 310-91 P co CCGG 66.230 -999.990 ... R7 1997 03 28 12 37 00 -46.4337 51.8478 202.00 197.00 5.00 47078 CRZ 1996 11 07 08 30 00 4137-91 P co CCGG 70.990 -999.990 ... R5 1999 01 12 13 04 00 -46.4337 51.8478 202.00 197.00 5.00 47079 CRZ 1996 11 07 08 30 00 4138-91 P co CCGG 70.750 -999.990 ... R5 1999 01 12 13 17 00 -46.4337 51.8478 202.00 197.00 5.00 47080 CRZ 1996 11 19 09 10 00 1139-91 P co CCGG 58.110 -999.990 *.. R7 1997 07 23 11 19 00 -46.4337 51.8478 202.00 197.00 5.00 47081 CRZ 1996 11 19 09 10 00 1140-91 P co CCGG 60.200 -999.990 *.. R7 1997 07 23 11 35 00 -46.4337 51.8478 202.00 197.00 5.00 47082 CRZ 1996 12 11 11 45 00 1254-91 P co CCGG 49.210 -999.990 *.. R7 1997 07 23 12 08 00 -46.4337 51.8478 202.00 197.00 5.00 47083 CRZ 1997 01 30 06 30 00 1229-91 P co CCGG 48.050 -999.990 *.. R7 1997 07 23 14 24 00 -46.4337 51.8478 202.00 197.00 5.00 47084 CRZ 1997 02 06 06 00 00 181-91 P co CCGG 43.460 -999.990 ... R7 1997 07 16 11 12 00 -46.4337 51.8478 202.00 197.00 5.00 47086 CRZ 1997 02 06 06 00 00 182-91 P co CCGG 44.630 -999.990 ... R7 1997 07 16 11 28 00 -46.4337 51.8478 202.00 197.00 5.00 47087 CRZ 1997 02 12 04 40 00 59-91 P co CCGG 47.010 -999.990 ... R7 1997 07 16 16 51 00 -46.4337 51.8478 202.00 197.00 5.00 47088 CRZ 1997 02 12 04 40 00 60-91 P co CCGG 49.250 -999.990 ... R7 1997 07 16 17 07 00 -46.4337 51.8478 202.00 197.00 5.00 47089 CRZ 1997 02 22 05 28 00 1045-91 P co CCGG 43.210 -999.990 ... R7 1997 07 16 15 46 00 -46.4337 51.8478 202.00 197.00 5.00 47090 CRZ 1997 02 22 05 28 00 1046-91 P co CCGG 43.720 -999.990 ... R7 1997 07 16 16 02 00 -46.4337 51.8478 202.00 197.00 5.00 47091 CRZ 1997 02 25 05 37 00 1289-91 P co CCGG 43.600 -999.990 ... R7 1997 07 16 16 18 00 -46.4337 51.8478 202.00 197.00 5.00 47092 CRZ 1997 02 25 05 37 00 1290-91 P co CCGG 44.900 -999.990 ... R7 1997 07 16 16 35 00 -46.4337 51.8478 202.00 197.00 5.00 47093 CRZ 1997 03 05 06 43 00 4119-91 P co CCGG 49.910 -999.990 ... R5 1999 01 12 09 49 00 -46.4337 51.8478 202.00 197.00 5.00 47094 CRZ 1997 03 05 06 43 00 4120-91 P co CCGG 51.060 -999.990 ... R5 1999 01 12 10 03 00 -46.4337 51.8478 202.00 197.00 5.00 47095 CRZ 1997 03 10 05 40 00 4117-91 P co CCGG 98.710 -999.990 P.. R5 1999 01 12 10 17 00 -46.4337 51.8478 202.00 197.00 5.00 47096 CRZ 1997 03 10 05 40 00 4118-91 P co CCGG 45.160 -999.990 P.. R5 1999 01 12 10 30 00 -46.4337 51.8478 202.00 197.00 5.00 47097 CRZ 1997 03 14 05 20 00 4123-91 P co CCGG 47.320 -999.990 P.. R5 1999 01 12 10 46 00 -46.4337 51.8478 202.00 197.00 5.00 47098 CRZ 1997 03 14 05 20 00 4124-91 P co CCGG 50.570 -999.990 P.. R5 1999 01 12 10 59 00 -46.4337 51.8478 202.00 197.00 5.00 47099 CRZ 1997 03 21 05 15 00 4129-91 P co CCGG 47.230 -999.990 P.. R5 1999 01 15 12 04 00 -46.4337 51.8478 202.00 197.00 5.00 47100 CRZ 1997 03 21 05 15 00 4130-91 P co CCGG 44.550 -999.990 P.. R5 1999 01 15 12 18 00 -46.4337 51.8478 202.00 197.00 5.00 47101 CRZ 1997 05 10 06 35 00 4127-91 P co CCGG 55.430 -999.990 ... R5 1999 01 15 09 46 00 -46.4337 51.8478 202.00 197.00 5.00 47102 CRZ 1997 05 10 06 35 00 4128-91 P co CCGG 55.880 -999.990 ... R5 1999 01 15 10 00 00 -46.4337 51.8478 202.00 197.00 5.00 47103 CRZ 1997 05 23 06 30 00 4131-91 P co CCGG 53.670 -999.990 P.. R5 1999 01 12 12 09 00 -46.4337 51.8478 202.00 197.00 5.00 47104 CRZ 1997 05 23 06 30 00 4132-91 P co CCGG 64.110 -999.990 P.. R5 1999 01 12 12 23 00 -46.4337 51.8478 202.00 197.00 5.00 47105 CRZ 1997 05 27 10 15 00 1809-91 P co CCGG 54.590 -999.990 ... R5 1999 01 15 10 41 00 -46.4337 51.8478 202.00 197.00 5.00 47106 CRZ 1997 05 27 10 15 00 1810-91 P co CCGG 53.720 -999.990 ... R5 1999 01 15 10 54 00 -46.4337 51.8478 202.00 197.00 5.00 47107 CRZ 1997 06 04 06 45 00 91-91 P co CCGG 58.240 -999.990 P.. R5 1999 01 15 11 37 00 -46.4337 51.8478 202.00 197.00 5.00 47108 CRZ 1997 06 04 06 45 00 92-91 P co CCGG 54.010 -999.990 P.. R5 1999 01 15 11 51 00 -46.4337 51.8478 202.00 197.00 5.00 47109 CRZ 1997 07 12 04 35 00 179-91 P co CCGG 70.240 -999.990 ... R5 1999 01 15 11 10 00 -46.4337 51.8478 202.00 197.00 5.00 47110 CRZ 1997 07 12 04 35 00 180-91 P co CCGG 68.580 -999.990 ... R5 1999 01 15 11 23 00 -46.4337 51.8478 202.00 197.00 5.00 47111 CRZ 1997 07 20 05 30 00 1245-91 P co CCGG 62.040 -999.990 ... R5 1999 01 15 12 32 00 -46.4337 51.8478 202.00 197.00 5.00 47112 CRZ 1997 07 20 05 30 00 1246-91 P co CCGG 63.880 -999.990 ... R5 1999 01 15 12 45 00 -46.4337 51.8478 202.00 197.00 5.00 47113 CRZ 1997 07 27 06 05 00 73-91 P co CCGG 64.500 -999.990 ... R5 1999 01 15 13 55 00 -46.4337 51.8478 202.00 197.00 5.00 47114 CRZ 1997 07 27 06 05 00 74-91 P co CCGG 64.420 -999.990 ... R5 1999 01 15 14 09 00 -46.4337 51.8478 202.00 197.00 5.00 47115 CRZ 1997 08 06 05 30 00 603-91 P co CCGG 64.500 -999.990 ... R5 1999 01 11 10 04 00 -46.4337 51.8478 202.00 197.00 5.00 47116 CRZ 1997 08 06 05 30 00 604-91 P co CCGG 64.310 -999.990 ... R5 1999 01 11 10 17 00 -46.4337 51.8478 202.00 197.00 5.00 47117 CRZ 1997 08 12 03 30 00 1171-91 P co CCGG 64.260 -999.990 ... R5 1999 01 08 15 30 00 -46.4337 51.8478 202.00 197.00 5.00 47118 CRZ 1997 08 12 03 30 00 1172-91 P co CCGG 66.740 -999.990 ... R5 1999 01 08 15 44 00 -46.4337 51.8478 202.00 197.00 5.00 47119 CRZ 1997 08 23 06 15 00 1911-91 P co CCGG 68.490 -999.990 P.. R5 1999 01 11 09 37 00 -46.4337 51.8478 202.00 197.00 5.00 47120 CRZ 1997 08 23 06 15 00 1912-91 P co CCGG 64.690 -999.990 P.. R5 1999 01 11 09 50 00 -46.4337 51.8478 202.00 197.00 5.00 47121 CRZ 1997 08 28 09 00 00 169-91 P co CCGG 68.070 -999.990 ... R5 1999 01 11 10 31 00 -46.4337 51.8478 202.00 197.00 5.00 47122 CRZ 1997 08 28 09 00 00 170-91 P co CCGG 65.620 -999.990 ... R5 1999 01 11 10 45 00 -46.4337 51.8478 202.00 197.00 5.00 47123 CRZ 1997 09 02 04 15 00 4135-91 P co CCGG 65.490 -999.990 P.. R5 1999 01 05 10 24 00 -46.4337 51.8478 202.00 197.00 5.00 47124 CRZ 1997 09 02 04 15 00 4136-91 P co CCGG 95.500 -999.990 P.. R5 1999 01 05 10 38 00 -46.4337 51.8478 202.00 197.00 5.00 47125 CRZ 1997 09 10 05 30 00 4121-91 P co CCGG 66.240 -999.990 ... R5 1999 01 05 09 57 00 -46.4337 51.8478 202.00 197.00 5.00 47126 CRZ 1997 09 10 05 30 00 4122-91 P co CCGG 66.650 -999.990 ... R5 1999 01 05 10 10 00 -46.4337 51.8478 202.00 197.00 5.00 47127 CRZ 1997 09 19 10 00 00 4141-91 P co CCGG 70.390 -999.990 ... R5 1999 01 12 11 13 00 -46.4337 51.8478 202.00 197.00 5.00 47128 CRZ 1997 09 19 10 00 00 4142-91 P co CCGG 72.800 -999.990 ... R5 1999 01 12 11 27 00 -46.4337 51.8478 202.00 197.00 5.00 47129 CRZ 1997 10 06 09 15 00 4133-91 P co CCGG 69.610 -999.990 ... R5 1999 01 12 12 36 00 -46.4337 51.8478 202.00 197.00 5.00 47130 CRZ 1997 10 06 09 15 00 4134-91 P co CCGG 69.430 -999.990 ... R5 1999 01 12 12 50 00 -46.4337 51.8478 202.00 197.00 5.00 47131 CRZ 1997 10 12 05 30 00 4139-91 P co CCGG 70.820 -999.990 ... R5 1999 01 12 11 42 00 -46.4337 51.8478 202.00 197.00 5.00 47132 CRZ 1997 10 12 05 30 00 4140-91 P co CCGG 71.630 -999.990 ... R5 1999 01 12 11 55 00 -46.4337 51.8478 202.00 197.00 5.00 47133 CRZ 1998 01 02 06 00 00 177-91 P co CCGG 59.490 -999.990 ... R5 1998 10 15 13 53 00 -46.4337 51.8478 202.00 197.00 5.00 47134 CRZ 1998 01 02 06 00 00 178-91 P co CCGG 57.340 -999.990 ... R5 1998 10 15 14 07 00 -46.4337 51.8478 202.00 197.00 5.00 47135 CRZ 1998 01 15 10 30 00 4423-91 P co CCGG 56.520 -999.990 ... R5 1998 10 15 13 26 00 -46.4337 51.8478 202.00 197.00 5.00 47136 CRZ 1998 01 15 10 30 00 4424-91 P co CCGG 55.490 -999.990 ... R5 1998 10 15 13 40 00 -46.4337 51.8478 202.00 197.00 5.00 47137 CRZ 1998 02 03 06 30 00 1191-91 P co CCGG 53.040 -999.990 ... R5 1998 10 15 12 59 00 -46.4337 51.8478 202.00 197.00 5.00 47138 CRZ 1998 02 03 06 30 00 1192-91 P co CCGG 52.620 -999.990 ... R5 1998 10 15 13 12 00 -46.4337 51.8478 202.00 197.00 5.00 47139 CRZ 1998 02 11 09 35 00 323-91 P co CCGG 51.710 -999.990 ... R5 1998 10 15 12 31 00 -46.4337 51.8478 202.00 197.00 5.00 47140 CRZ 1998 02 11 09 35 00 324-91 P co CCGG 50.280 -999.990 ... R5 1998 10 15 12 45 00 -46.4337 51.8478 202.00 197.00 5.00 47141 CRZ 1998 02 20 07 00 00 1579-91 P co CCGG 54.360 -999.990 P.. R5 1998 10 20 14 04 00 -46.4337 51.8478 202.00 197.00 5.00 47142 CRZ 1998 02 20 07 00 00 1580-91 P co CCGG 48.730 -999.990 P.. R5 1998 10 20 14 18 00 -46.4337 51.8478 202.00 197.00 5.00 47143 CRZ 1998 03 12 12 00 00 1513-91 P co CCGG 47.410 -999.990 ... R5 1998 10 20 14 59 00 -46.4337 51.8478 202.00 197.00 5.00 47144 CRZ 1998 03 12 12 00 00 1514-91 P co CCGG 46.800 -999.990 ... R5 1998 10 20 15 12 00 -46.4337 51.8478 202.00 197.00 5.00 47145 CRZ 1998 03 16 11 00 00 463-91 P co CCGG 47.570 -999.990 ... R5 1998 10 20 14 32 00 -46.4337 51.8478 202.00 197.00 5.00 47146 CRZ 1998 03 16 11 00 00 464-91 P co CCGG 47.330 -999.990 ... R5 1998 10 20 14 45 00 -46.4337 51.8478 202.00 197.00 5.00 47147 CRZ 1998 04 23 13 10 00 561-91 P co CCGG 53.550 -999.990 ... R5 1998 10 20 12 13 00 -46.4337 51.8478 202.00 197.00 5.00 47148 CRZ 1998 04 23 13 10 00 562-91 P co CCGG 51.160 -999.990 ... R5 1998 10 20 12 27 00 -46.4337 51.8478 202.00 197.00 5.00 47149 CRZ 1998 04 30 10 30 00 657-91 P co CCGG 51.110 -999.990 ... R5 1998 10 15 10 58 00 -46.4337 51.8478 202.00 197.00 5.00 47150 CRZ 1998 04 30 10 30 00 658-91 P co CCGG 50.060 -999.990 ... R5 1998 10 15 11 12 00 -46.4337 51.8478 202.00 197.00 5.00 47151 CRZ 1998 05 07 06 30 00 1769-91 P co CCGG 58.180 -999.990 ... R5 1998 10 15 10 31 00 -46.4337 51.8478 202.00 197.00 5.00 47152 CRZ 1998 05 07 06 30 00 1770-91 P co CCGG 58.280 -999.990 ... R5 1998 10 15 10 45 00 -46.4337 51.8478 202.00 197.00 5.00 47153 CRZ 1998 05 23 11 40 00 1125-91 P co CCGG 54.940 -999.990 ... R5 1998 10 20 12 41 00 -46.4337 51.8478 202.00 197.00 5.00 47154 CRZ 1998 05 23 11 40 00 1126-91 P co CCGG 54.190 -999.990 ... R5 1998 10 20 12 54 00 -46.4337 51.8478 202.00 197.00 5.00 47155 CRZ 1998 06 13 06 10 00 1855-91 P co CCGG 58.170 -999.990 ... R5 1998 10 20 11 46 00 -46.4337 51.8478 202.00 197.00 5.00 47156 CRZ 1998 06 13 06 10 00 1856-91 P co CCGG 58.090 -999.990 ... R5 1998 10 20 12 00 00 -46.4337 51.8478 202.00 197.00 5.00 47157 CRZ 1998 07 07 11 15 00 233-91 P co CCGG 62.840 -999.990 ... R5 1998 10 16 11 41 00 -46.4337 51.8478 202.00 197.00 5.00 47158 CRZ 1998 07 07 11 15 00 234-91 P co CCGG 62.160 -999.990 ... R5 1998 10 16 11 54 00 -46.4337 51.8478 202.00 197.00 5.00 47159 CRZ 1998 07 13 06 20 00 261-91 P co CCGG 63.230 -999.990 ... R5 1998 10 16 11 13 00 -46.4337 51.8478 202.00 197.00 5.00 47160 CRZ 1998 07 13 06 20 00 262-91 P co CCGG 63.160 -999.990 ... R5 1998 10 16 11 27 00 -46.4337 51.8478 202.00 197.00 5.00 47161 CRZ 1998 07 20 09 00 00 1847-91 P co CCGG 66.680 -999.990 ... R5 1998 10 15 11 26 00 -46.4337 51.8478 202.00 197.00 5.00 47162 CRZ 1998 07 20 09 00 00 1848-91 P co CCGG 66.400 -999.990 ... R5 1998 10 15 11 39 00 -46.4337 51.8478 202.00 197.00 5.00 47163 CRZ 1998 08 12 11 10 00 639-91 P co CCGG 69.200 -999.990 ... R5 1998 10 15 11 53 00 -46.4337 51.8478 202.00 197.00 5.00 47164 CRZ 1998 08 12 11 10 00 640-91 P co CCGG 69.940 -999.990 ... R5 1998 10 15 12 07 00 -46.4337 51.8478 202.00 197.00 5.00 47165 CRZ 1998 09 11 09 45 00 521-91 P co CCGG 73.820 -999.990 ... R5 1999 04 05 10 47 00 -46.4337 51.8478 202.00 197.00 5.00 47166 CRZ 1998 09 11 09 45 00 522-91 P co CCGG 72.090 -999.990 ... R5 1999 04 05 11 00 00 -46.4337 51.8478 202.00 197.00 5.00 47167 CRZ 1998 09 17 12 20 00 59-91 P co CCGG 73.180 -999.990 ... R5 1999 04 05 13 05 00 -46.4337 51.8478 202.00 197.00 5.00 47168 CRZ 1998 09 17 12 20 00 60-91 P co CCGG 72.410 -999.990 ... R5 1999 04 05 13 19 00 -46.4337 51.8478 202.00 197.00 5.00 47169 CRZ 1998 10 16 11 20 00 1223-91 P co CCGG 70.980 -999.990 ... R5 1999 04 05 11 43 00 -46.4337 51.8478 202.00 197.00 5.00 47170 CRZ 1998 10 16 11 20 00 1224-91 P co CCGG 69.800 -999.990 ... R5 1999 04 05 11 57 00 -46.4337 51.8478 202.00 197.00 5.00 47171 CRZ 1998 10 31 10 00 00 1603-91 P co CCGG 71.230 -999.990 ... R5 1999 04 05 15 25 00 -46.4337 51.8478 202.00 197.00 5.00 47172 CRZ 1998 10 31 10 00 00 1604-91 P co CCGG 70.530 -999.990 ... R5 1999 04 05 15 38 00 -46.4337 51.8478 202.00 197.00 5.00 47173 CRZ 1998 11 13 10 00 00 501-91 P co CCGG 69.450 -999.990 ... R5 1999 04 05 15 52 00 -46.4337 51.8478 202.00 197.00 5.00 47174 CRZ 1998 11 13 10 00 00 502-91 P co CCGG 68.860 -999.990 ... R5 1999 04 05 16 06 00 -46.4337 51.8478 202.00 197.00 5.00 47175 CRZ 1998 11 25 12 15 00 1557-91 P co CCGG 67.000 -999.990 ... R5 1999 04 05 14 56 00 -46.4337 51.8478 202.00 197.00 5.00 47176 CRZ 1998 11 25 12 15 00 1558-91 P co CCGG 66.080 -999.990 ... R5 1999 04 05 15 10 00 -46.4337 51.8478 202.00 197.00 5.00 47177 CRZ 1998 11 30 13 25 00 1035-91 P co CCGG 62.070 -999.990 ... R5 1999 04 05 16 19 00 -46.4337 51.8478 202.00 197.00 5.00 47178 CRZ 1998 11 30 13 25 00 1036-91 P co CCGG 62.000 -999.990 ... R5 1999 04 05 16 33 00 -46.4337 51.8478 202.00 197.00 5.00 47179 CRZ 1998 12 07 12 15 00 1201-91 P co CCGG 60.880 -999.990 ... R5 1999 08 30 12 34 00 -46.4337 51.8478 202.00 197.00 5.00 47180 CRZ 1998 12 07 12 15 00 1202-91 P co CCGG 60.610 -999.990 ... R5 1999 08 30 12 48 00 -46.4337 51.8478 202.00 197.00 5.00 47181 CRZ 1998 12 14 07 00 00 327-91 P co CCGG 58.390 -999.990 ... R5 1999 08 30 13 02 00 -46.4337 51.8478 202.00 197.00 5.00 47182 CRZ 1998 12 14 07 00 00 328-91 P co CCGG 57.430 -999.990 ... R5 1999 08 30 13 15 00 -46.4337 51.8478 202.00 197.00 5.00 47183 CRZ 1999 01 05 06 20 00 4195-91 P co CCGG 51.910 -999.990 ... R5 1999 08 30 13 58 00 -46.4337 51.8478 202.00 197.00 5.00 47184 CRZ 1999 01 05 06 20 00 4196-91 P co CCGG 50.760 -999.990 ... R5 1999 08 30 14 12 00 -46.4337 51.8478 202.00 197.00 5.00 47185 CRZ 1999 01 30 12 20 00 4447-91 P co CCGG 46.380 -999.990 ... R5 1999 08 30 13 29 00 -46.4337 51.8478 202.00 197.00 5.00 47186 CRZ 1999 01 30 12 20 00 4448-91 P co CCGG 46.420 -999.990 ... R5 1999 08 30 13 43 00 -46.4337 51.8478 202.00 197.00 5.00 47187 CRZ 1999 03 03 10 16 00 203-91 P co CCGG 44.900 -999.990 ... R5 1999 08 31 13 10 00 -46.4337 51.8478 202.00 197.00 5.00 47188 CRZ 1999 03 03 10 16 00 204-91 P co CCGG 46.260 -999.990 ... R5 1999 08 31 13 23 00 -46.4337 51.8478 202.00 197.00 5.00 47189 CRZ 1999 03 13 05 00 00 855-91 P co CCGG 43.300 -999.990 ... R5 1999 08 31 13 37 00 -46.4337 51.8478 202.00 197.00 5.00 47190 CRZ 1999 03 13 05 00 00 856-91 P co CCGG 42.930 -999.990 ... R5 1999 08 31 13 51 00 -46.4337 51.8478 202.00 197.00 5.00 47191 CRZ 1999 03 31 06 00 00 47-91 P co CCGG 50.390 -999.990 ... R5 1999 08 31 12 13 00 -46.4337 51.8478 202.00 197.00 5.00 47192 CRZ 1999 03 31 06 00 00 48-91 P co CCGG 47.830 -999.990 ... R5 1999 08 31 12 27 00 -46.4337 51.8478 202.00 197.00 5.00 47193 CRZ 1999 05 11 09 10 00 6493-66 P co CCGG 48.910 -999.990 ... R5 1999 08 31 09 51 00 -46.4337 51.8478 202.00 197.00 5.00 47194 CRZ 1999 05 11 09 10 00 6494-66 P co CCGG 48.380 -999.990 ... R5 1999 08 31 10 04 00 -46.4337 51.8478 202.00 197.00 5.00 47195 CRZ 1999 05 19 08 40 00 1505-91 P co CCGG 51.290 -999.990 ... R5 1999 08 31 15 01 00 -46.4337 51.8478 202.00 197.00 5.00 47196 CRZ 1999 05 19 08 40 00 1506-91 P co CCGG 52.170 -999.990 ... R5 1999 08 31 15 14 00 -46.4337 51.8478 202.00 197.00 5.00 47197 CRZ 1999 05 31 09 20 00 4603-91 P co CCGG 55.240 -999.990 ... R5 1999 08 31 12 42 00 -46.4337 51.8478 202.00 197.00 5.00 47198 CRZ 1999 05 31 09 20 00 4604-91 P co CCGG 54.530 -999.990 ... R5 1999 08 31 12 56 00 -46.4337 51.8478 202.00 197.00 5.00 47199 CRZ 1999 06 22 08 50 00 4151-91 P co CCGG 55.710 -999.990 ... R5 1999 08 31 14 04 00 -46.4337 51.8478 202.00 197.00 5.00 47200 CRZ 1999 06 22 08 50 00 4152-91 P co CCGG 54.940 -999.990 ... R5 1999 08 31 14 18 00 -46.4337 51.8478 202.00 197.00 5.00 47201 CRZ 1999 08 05 09 30 00 4159-91 P co CCGG 239.210 -999.990 P.C R5 1999 12 20 14 20 00 -46.4337 51.8478 202.00 197.00 5.00 47202 CRZ 1999 08 05 09 30 00 4160-91 P co CCGG 112.750 -999.990 P.. R5 1999 12 20 14 34 00 -46.4337 51.8478 202.00 197.00 5.00 47203 CRZ 1999 08 28 09 15 00 1663-91 P co CCGG 401.060 -999.990 .NC R5 1999 12 16 12 43 00 -46.4337 51.8478 202.00 197.00 5.00 47204 CRZ 1999 08 28 09 15 00 1664-91 P co CCGG 399.870 -999.990 .NC R5 1999 12 16 12 56 00 -46.4337 51.8478 202.00 197.00 5.00 47205 CRZ 1999 09 02 09 30 00 4409-91 P co CCGG 317.350 -999.990 P.C R5 1999 12 20 15 15 00 -46.4337 51.8478 202.00 197.00 5.00 47206 CRZ 1999 09 02 09 30 00 4410-91 P co CCGG 146.690 -999.990 P.. R5 1999 12 20 15 28 00 -46.4337 51.8478 202.00 197.00 5.00 47207 CRZ 1999 09 14 04 00 00 149-91 P co CCGG 326.950 -999.990 P.C R5 1999 12 16 14 33 00 -46.4337 51.8478 202.00 197.00 5.00 47208 CRZ 1999 09 14 04 00 00 150-91 P co CCGG 148.990 -999.990 P.. R5 1999 12 16 14 47 00 -46.4337 51.8478 202.00 197.00 5.00 47209 CRZ 1999 09 29 05 15 00 4089-91 P co CCGG 217.280 -999.990 P.. R5 1999 12 20 14 47 00 -46.4337 51.8478 202.00 197.00 5.00 47210 CRZ 1999 09 29 05 15 00 4090-91 P co CCGG 109.030 -999.990 P.. R5 1999 12 20 15 01 00 -46.4337 51.8478 202.00 197.00 5.00 47211 CRZ 1999 10 06 10 00 00 4071-91 P co CCGG 313.120 -999.990 P.C R5 1999 12 16 12 15 00 -46.4337 51.8478 202.00 197.00 5.00 47212 CRZ 1999 10 06 10 00 00 4072-91 P co CCGG 117.570 -999.990 P.. R5 1999 12 16 12 29 00 -46.4337 51.8478 202.00 197.00 5.00 47213 CRZ 1999 10 14 03 30 00 897-91 P co CCGG 116.900 -999.990 P.. R5 1999 12 16 11 48 00 -46.4337 51.8478 202.00 197.00 5.00 47214 CRZ 1999 10 14 03 30 00 898-91 P co CCGG 223.160 -999.990 P.. R5 1999 12 16 12 02 00 -46.4337 51.8478 202.00 197.00 5.00 47215 CRZ 1999 10 31 04 00 00 153-91 P co CCGG 245.350 -999.990 P.C R5 1999 12 20 13 51 00 -46.4337 51.8478 202.00 197.00 5.00 47216 CRZ 1999 10 31 04 00 00 154-91 P co CCGG 264.340 -999.990 P.C R5 1999 12 20 14 05 00 -46.4337 51.8478 202.00 197.00 5.00 47217 CRZ 1999 12 14 10 46 00 2053-91 P co CCGG 57.500 -999.990 ... R5 2000 03 02 11 57 00 -46.4337 51.8478 202.00 197.00 5.00 47218 CRZ 1999 12 14 10 46 00 2054-91 P co CCGG 59.080 -999.990 ... R5 2000 03 02 12 10 00 -46.4337 51.8478 202.00 197.00 5.00 47219 CRZ 1999 12 29 06 30 00 4655-91 P co CCGG 54.210 -999.990 ... R5 2000 03 02 10 35 00 -46.4337 51.8478 202.00 197.00 5.00 47220 CRZ 1999 12 29 06 30 00 4656-91 P co CCGG 53.600 -999.990 ... R5 2000 03 02 10 48 00 -46.4337 51.8478 202.00 197.00 5.00 47221 CRZ 2000 01 04 06 00 00 1495-91 P co CCGG 60.450 -999.990 ... R5 2000 08 04 10 18 00 -46.4337 51.8478 202.00 197.00 5.00 47222 CRZ 2000 01 04 06 00 00 1496-91 P co CCGG 59.550 -999.990 ... R5 2000 08 04 10 31 00 -46.4337 51.8478 202.00 197.00 5.00 47223 CRZ 2000 01 11 10 45 00 145-91 P co CCGG 63.600 -999.990 .X. R5 2000 08 02 08 52 00 -46.4337 51.8478 202.00 197.00 5.00 47224 CRZ 2000 01 11 10 45 00 146-91 P co CCGG 66.330 -999.990 .X. R5 2000 08 02 09 05 00 -46.4337 51.8478 202.00 197.00 5.00 47225 CRZ 2000 01 28 05 56 00 453-91 P co CCGG 54.810 -999.990 ... R5 2000 08 04 09 26 00 -46.4337 51.8478 202.00 197.00 5.00 47226 CRZ 2000 01 28 05 56 00 454-91 P co CCGG 54.160 -999.990 ... R5 2000 08 04 09 39 00 -46.4337 51.8478 202.00 197.00 5.00 47227 CRZ 2000 02 05 05 30 00 1771-91 P co CCGG 51.850 -999.990 P.. R5 2000 08 02 09 18 00 -46.4337 51.8478 202.00 197.00 5.00 47228 CRZ 2000 02 05 05 30 00 1772-91 P co CCGG 48.790 -999.990 P.. R5 2000 08 02 09 31 00 -46.4337 51.8478 202.00 197.00 5.00 47229 CRZ 2000 02 10 09 10 00 343-91 P co CCGG 48.850 -999.990 ... R5 2000 08 04 12 58 00 -46.4337 51.8478 202.00 197.00 5.00 47230 CRZ 2000 02 10 09 10 00 344-91 P co CCGG 51.270 -999.990 ... R5 2000 08 04 13 11 00 -46.4337 51.8478 202.00 197.00 5.00 47231 CRZ 2000 02 18 12 20 00 4043-91 P co CCGG 47.400 -999.990 ... R5 2000 08 04 10 46 00 -46.4337 51.8478 202.00 197.00 5.00 47232 CRZ 2000 02 18 12 20 00 4044-91 P co CCGG 47.150 -999.990 ... R5 2000 08 04 10 59 00 -46.4337 51.8478 202.00 197.00 5.00 47233 CRZ 2000 02 26 04 30 00 1079-91 P co CCGG 50.150 -999.990 P.. R5 2000 08 04 13 24 00 -46.4337 51.8478 202.00 197.00 5.00 47234 CRZ 2000 02 26 04 30 00 1080-91 P co CCGG 53.490 -999.990 P.. R5 2000 08 04 13 37 00 -46.4337 51.8478 202.00 197.00 5.00 47235 CRZ 2000 03 07 08 25 00 1173-91 P co CCGG 49.900 -999.990 ... R5 2000 08 04 12 04 00 -46.4337 51.8478 202.00 197.00 5.00 47236 CRZ 2000 03 07 08 25 00 1174-91 P co CCGG 50.000 -999.990 ... R5 2000 08 04 12 17 00 -46.4337 51.8478 202.00 197.00 5.00 47237 CRZ 2000 03 18 05 00 00 1215-91 P co CCGG 48.950 -999.990 ... R5 2000 09 08 10 13 00 -46.4337 51.8478 202.00 197.00 5.00 47238 CRZ 2000 03 18 05 00 00 1216-91 P co CCGG 46.430 -999.990 ... R5 2000 09 08 10 26 00 -46.4337 51.8478 202.00 197.00 5.00 47239 CRZ 2000 03 29 12 10 00 4011-91 P co CCGG 53.140 -999.990 P.. R5 2000 09 08 09 47 00 -46.4337 51.8478 202.00 197.00 5.00 47240 CRZ 2000 03 29 12 10 00 4012-91 P co CCGG 46.030 -999.990 P.. R5 2000 09 08 10 00 00 -46.4337 51.8478 202.00 197.00 5.00 47241 CRZ 2000 04 08 05 45 00 4185-91 P co CCGG 50.070 -999.990 P.. R5 2000 09 08 09 09 00 -46.4337 51.8478 202.00 197.00 5.00 47242 CRZ 2000 04 08 05 45 00 4186-91 P co CCGG 47.040 -999.990 P.. R5 2000 09 08 09 22 00 -46.4337 51.8478 202.00 197.00 5.00 47243 CRZ 2000 04 16 01 10 00 659-91 P co CCGG 48.410 -999.990 ... R5 2000 09 08 11 05 00 -46.4337 51.8478 202.00 197.00 5.00 47244 CRZ 2000 04 16 01 10 00 660-91 P co CCGG 47.180 -999.990 ... R5 2000 09 08 11 18 00 -46.4337 51.8478 202.00 197.00 5.00 47245 CRZ 2000 04 28 08 45 00 467-91 P co CCGG 47.430 -999.990 ... R5 2000 09 08 12 07 00 -46.4337 51.8478 202.00 197.00 5.00 47246 CRZ 2000 04 28 08 45 00 468-91 P co CCGG 46.790 -999.990 ... R5 2000 09 08 12 20 00 -46.4337 51.8478 202.00 197.00 5.00 47247 CRZ 2000 05 06 06 10 00 403-91 P co CCGG 52.450 -999.990 ... R5 2000 09 08 12 33 00 -46.4337 51.8478 202.00 197.00 5.00 47248 CRZ 2000 05 06 06 10 00 404-91 P co CCGG 50.830 -999.990 ... R5 2000 09 08 12 46 00 -46.4337 51.8478 202.00 197.00 5.00 47249 CRZ 2000 05 11 10 00 00 381-91 P co CCGG 50.800 -999.990 ... R5 2000 09 08 10 39 00 -46.4337 51.8478 202.00 197.00 5.00 47250 CRZ 2000 05 11 10 00 00 382-91 P co CCGG 50.750 -999.990 ... R5 2000 09 08 10 52 00 -46.4337 51.8478 202.00 197.00 5.00 47251 CRZ 2000 05 18 10 10 00 261-91 P co CCGG 51.080 -999.990 ... R5 2000 09 08 11 41 00 -46.4337 51.8478 202.00 197.00 5.00 47252 CRZ 2000 05 18 10 10 00 262-91 P co CCGG 51.640 -999.990 ... R5 2000 09 08 11 54 00 -46.4337 51.8478 202.00 197.00 5.00 47253 CRZ 2000 05 27 09 15 00 239-91 P co CCGG 50.430 -999.990 ... R5 2001 01 25 14 44 00 -46.4337 51.8478 202.00 197.00 5.00 47254 CRZ 2000 05 27 09 15 00 240-91 P co CCGG 50.420 -999.990 ... R5 2001 01 25 14 57 00 -46.4337 51.8478 202.00 197.00 5.00 47255 CRZ 2000 06 09 04 50 00 1583-91 P co CCGG 53.930 -999.990 ... R5 2001 01 23 09 10 00 -46.4337 51.8478 202.00 197.00 5.00 47256 CRZ 2000 06 09 04 50 00 1584-91 P co CCGG 52.580 -999.990 ... R5 2001 01 23 09 23 00 -46.4337 51.8478 202.00 197.00 5.00 47257 CRZ 2000 06 21 06 55 00 1657-91 P co CCGG 71.570 -999.990 .X. R5 2001 01 26 10 19 00 -46.4337 51.8478 202.00 197.00 5.00 47258 CRZ 2000 06 21 06 55 00 1658-91 P co CCGG 70.660 -999.990 .X. R5 2001 01 26 10 32 00 -46.4337 51.8478 202.00 197.00 5.00 47259 CRZ 2000 06 26 12 00 00 2039-91 P co CCGG 53.850 -999.990 ... R5 2001 01 23 09 37 00 -46.4337 51.8478 202.00 197.00 5.00 47260 CRZ 2000 06 26 12 00 00 2040-91 P co CCGG 53.000 -999.990 ... R5 2001 01 23 09 50 00 -46.4337 51.8478 202.00 197.00 5.00 47261 CRZ 2000 07 05 11 40 00 1409-91 P co CCGG 56.780 -999.990 P.. R5 2001 01 25 13 52 00 -46.4337 51.8478 202.00 197.00 5.00 47262 CRZ 2000 07 05 11 40 00 1410-91 P co CCGG 88.360 -999.990 P.. R5 2001 01 25 14 05 00 -46.4337 51.8478 202.00 197.00 5.00 47263 CRZ 2000 07 21 11 35 00 4495-91 P co CCGG 58.560 -999.990 ... R5 2001 01 25 13 25 00 -46.4337 51.8478 202.00 197.00 5.00 47264 CRZ 2000 07 21 11 35 00 4496-91 P co CCGG 59.110 -999.990 ... R5 2001 01 25 13 39 00 -46.4337 51.8478 202.00 197.00 5.00 47265 CRZ 2000 07 29 13 00 00 1637-91 P co CCGG 60.410 -999.990 ... R5 2001 01 25 10 45 00 -46.4337 51.8478 202.00 197.00 5.00 47266 CRZ 2000 07 29 13 00 00 1638-91 P co CCGG 60.870 -999.990 ... R5 2001 01 25 10 58 00 -46.4337 51.8478 202.00 197.00 5.00 47267 CRZ 2000 08 08 13 15 00 4595-91 P co CCGG 64.710 -999.990 ... R5 2001 01 23 10 30 00 -46.4337 51.8478 202.00 197.00 5.00 47268 CRZ 2000 08 08 13 15 00 4596-91 P co CCGG 62.630 -999.990 ... R5 2001 01 23 10 44 00 -46.4337 51.8478 202.00 197.00 5.00 47269 CRZ 2000 08 14 04 35 00 1249-91 P co CCGG 62.610 -999.990 P.. R5 2001 01 23 10 03 00 -46.4337 51.8478 202.00 197.00 5.00 47270 CRZ 2000 08 14 04 35 00 1250-91 P co CCGG 89.170 -999.990 P.. R5 2001 01 23 10 16 00 -46.4337 51.8478 202.00 197.00 5.00 47271 CRZ 2000 08 22 08 40 00 727-91 P co CCGG 67.560 -999.990 P.. R5 2001 01 25 10 19 00 -46.4337 51.8478 202.00 197.00 5.00 47272 CRZ 2000 08 22 08 40 00 728-91 P co CCGG 70.810 -999.990 P.. R5 2001 01 25 10 32 00 -46.4337 51.8478 202.00 197.00 5.00 47273 CRZ 2000 09 06 05 30 00 853-91 P co CCGG 64.100 -999.990 ... R5 2001 01 25 12 32 00 -46.4337 51.8478 202.00 197.00 5.00 47274 CRZ 2000 09 06 05 30 00 854-91 P co CCGG 63.740 -999.990 ... R5 2001 01 25 12 45 00 -46.4337 51.8478 202.00 197.00 5.00 47275 CRZ 2000 09 18 08 50 00 73-91 P co CCGG 69.280 -999.990 ... R5 2001 01 24 14 34 00 -46.4337 51.8478 202.00 197.00 5.00 47276 CRZ 2000 09 18 08 50 00 74-91 P co CCGG 69.120 -999.990 ... R5 2001 01 24 14 47 00 -46.4337 51.8478 202.00 197.00 5.00 47277 CRZ 2000 10 11 09 15 00 1019-91 P co CCGG 63.370 -999.990 ... R5 2001 01 24 14 08 00 -46.4337 51.8478 202.00 197.00 5.00 47278 CRZ 2000 10 11 09 15 00 1020-91 P co CCGG 64.370 -999.990 ... R5 2001 01 24 14 21 00 -46.4337 51.8478 202.00 197.00 5.00 47279 CRZ 2000 10 23 10 00 00 477-91 P co CCGG 66.940 -999.990 ... R5 2001 01 24 13 42 00 -46.4337 51.8478 202.00 197.00 5.00 47280 CRZ 2000 10 23 10 00 00 478-91 P co CCGG 67.850 -999.990 ... R5 2001 01 24 13 55 00 -46.4337 51.8478 202.00 197.00 5.00 47281 CRZ 2000 11 09 08 45 00 1021-91 P co CCGG 59.750 -999.990 ... R5 2001 01 25 08 58 00 -46.4337 51.8478 202.00 197.00 5.00 47282 CRZ 2000 11 09 08 45 00 1022-91 P co CCGG 60.250 -999.990 ... R5 2001 01 25 09 11 00 -46.4337 51.8478 202.00 197.00 5.00 47283 CRZ 2000 11 22 07 00 00 1073-91 P co CCGG 58.730 -999.990 ... R5 2001 01 25 09 24 00 -46.4337 51.8478 202.00 197.00 5.00 47284 CRZ 2000 11 22 07 00 00 1074-91 P co CCGG 58.960 -999.990 ... R5 2001 01 25 09 37 00 -46.4337 51.8478 202.00 197.00 5.00 47285 CRZ 2000 11 28 13 40 00 989-91 P co CCGG 56.400 -999.990 ... R5 2001 05 04 14 52 00 -46.4337 51.8478 202.00 197.00 5.00 47286 CRZ 2000 11 28 13 40 00 990-91 P co CCGG 58.420 -999.990 ... R5 2001 05 04 15 06 00 -46.4337 51.8478 202.00 197.00 5.00 47287 CRZ 2000 12 01 10 00 00 4811-91 P co CCGG 65.370 -999.990 P.. R5 2001 05 07 09 47 00 -46.4337 51.8478 202.00 197.00 5.00 47288 CRZ 2000 12 01 10 00 00 4812-91 P co CCGG 59.510 -999.990 P.. R5 2001 05 07 10 00 00 -46.4337 51.8478 202.00 197.00 5.00 47289 CRZ 2000 12 15 11 45 00 4583-91 P co CCGG 57.110 -999.990 ... R5 2001 05 04 16 19 00 -46.4337 51.8478 202.00 197.00 5.00 47290 CRZ 2000 12 15 11 45 00 4584-91 P co CCGG 55.220 -999.990 ... R5 2001 05 04 16 32 00 -46.4337 51.8478 202.00 197.00 5.00 47291 CRZ 2000 12 27 11 20 00 4737-91 P co CCGG 59.030 -999.990 P.. R5 2001 05 04 15 53 00 -46.4337 51.8478 202.00 197.00 5.00 47292 CRZ 2000 12 27 11 20 00 4738-91 P co CCGG 54.670 -999.990 P.. R5 2001 05 04 16 06 00 -46.4337 51.8478 202.00 197.00 5.00 47293 CRZ 2001 01 13 05 45 00 1619-91 P co CCGG 47.190 -999.990 ... R5 2001 05 04 14 00 00 -46.4337 51.8478 202.00 197.00 5.00 47294 CRZ 2001 01 13 05 45 00 1620-91 P co CCGG 46.430 -999.990 ... R5 2001 05 04 14 13 00 -46.4337 51.8478 202.00 197.00 5.00 47295 CRZ 2001 01 23 07 30 00 603-91 P co CCGG 58.130 -999.990 ... R5 2001 05 04 13 34 00 -46.4337 51.8478 202.00 197.00 5.00 47296 CRZ 2001 01 23 07 30 00 604-91 P co CCGG 55.650 -999.990 ... R5 2001 05 04 13 47 00 -46.4337 51.8478 202.00 197.00 5.00 47297 CRZ 2001 01 29 09 50 00 1355-91 P co CCGG 46.910 -999.990 ... R5 2001 05 04 15 27 00 -46.4337 51.8478 202.00 197.00 5.00 47298 CRZ 2001 01 29 09 50 00 1356-91 P co CCGG 47.390 -999.990 ... R5 2001 05 04 15 40 00 -46.4337 51.8478 202.00 197.00 5.00 47299 CRZ 2001 02 08 09 50 00 1865-91 P co CCGG 44.850 -999.990 ... R5 2001 05 04 16 45 00 -46.4337 51.8478 202.00 197.00 5.00 47300 CRZ 2001 02 19 12 00 00 221-91 P co CCGG 46.120 -999.990 ... R5 2001 08 17 13 14 00 -46.4337 51.8478 202.00 197.00 5.00 47301 CRZ 2001 02 19 12 00 00 222-91 P co CCGG 46.600 -999.990 ... R5 2001 08 17 13 27 00 -46.4337 51.8478 202.00 197.00 5.00 47302 CRZ 2001 02 26 05 15 00 135-98 P co CCGG 48.220 -999.990 ... R5 2001 08 17 13 40 00 -46.4337 51.8478 202.00 197.00 5.00 47303 CRZ 2001 02 26 05 15 00 136-98 P co CCGG 50.770 -999.990 ... R5 2001 08 17 13 53 00 -46.4337 51.8478 202.00 197.00 5.00 47304 CRZ 2001 03 08 11 15 00 1601-91 P co CCGG 46.220 -999.990 ... R5 2001 08 17 16 19 00 -46.4337 51.8478 202.00 197.00 5.00 47305 CRZ 2001 03 08 11 15 00 1602-91 P co CCGG 45.710 -999.990 ... R5 2001 08 17 16 32 00 -46.4337 51.8478 202.00 197.00 5.00 47306 CRZ 2001 03 15 10 05 00 1615-91 P co CCGG 52.820 -999.990 ... R5 2001 08 17 15 27 00 -46.4337 51.8478 202.00 197.00 5.00 47307 CRZ 2001 03 15 10 05 00 1616-91 P co CCGG 52.150 -999.990 ... R5 2001 08 17 15 40 00 -46.4337 51.8478 202.00 197.00 5.00 47308 CRZ 2001 04 02 09 46 00 1967-91 P co CCGG 46.630 -999.990 ... R5 2001 08 17 14 33 00 -46.4337 51.8478 202.00 197.00 5.00 47309 CRZ 2001 04 02 09 46 00 1968-91 P co CCGG 45.280 -999.990 ... R5 2001 08 17 14 46 00 -46.4337 51.8478 202.00 197.00 5.00 47310 CRZ 2001 04 12 09 45 00 327-91 P co CCGG 46.650 -999.990 ... R5 2001 08 17 15 01 00 -46.4337 51.8478 202.00 197.00 5.00 47311 CRZ 2001 04 12 09 45 00 328-91 P co CCGG 47.860 -999.990 ... R5 2001 08 17 15 14 00 -46.4337 51.8478 202.00 197.00 5.00 47312 CRZ 2001 04 23 09 22 00 4005-91 P co CCGG 51.570 -999.990 ... R5 2001 08 20 13 41 00 -46.4337 51.8478 202.00 197.00 5.00 47313 CRZ 2001 04 23 09 22 00 4006-91 P co CCGG 49.810 -999.990 ... R5 2001 08 20 13 54 00 -46.4337 51.8478 202.00 197.00 5.00 47314 CRZ 2001 05 03 10 30 00 79-91 P co CCGG 54.080 -999.990 ... R5 2001 08 20 13 15 00 -46.4337 51.8478 202.00 197.00 5.00 47315 CRZ 2001 05 03 10 30 00 80-91 P co CCGG 53.440 -999.990 ... R5 2001 08 20 13 28 00 -46.4337 51.8478 202.00 197.00 5.00 47316 CRZ 2001 05 22 07 40 00 4251-91 P co CCGG 53.390 -999.990 ... R5 2001 08 20 15 55 00 -46.4337 51.8478 202.00 197.00 5.00 47317 CRZ 2001 05 22 07 40 00 4252-91 P co CCGG 51.830 -999.990 ... R5 2001 08 20 16 08 00 -46.4337 51.8478 202.00 197.00 5.00 47318 CRZ 2001 05 29 09 30 00 1167-91 P co CCGG 55.460 -999.990 ... R5 2001 08 20 16 21 00 -46.4337 51.8478 202.00 197.00 5.00 47319 CRZ 2001 05 29 09 30 00 1168-91 P co CCGG 55.740 -999.990 ... R5 2001 08 20 16 34 00 -46.4337 51.8478 202.00 197.00 5.00 47320 CRZ 2001 06 09 07 54 00 1951-91 P co CCGG 55.490 -999.990 ... R5 2001 08 20 11 19 00 -46.4337 51.8478 202.00 197.00 5.00 47321 CRZ 2001 06 09 07 54 00 1952-91 P co CCGG 55.730 -999.990 ... R5 2001 08 20 11 32 00 -46.4337 51.8478 202.00 197.00 5.00 47322 CRZ 2001 06 19 10 30 00 521-91 P co CCGG 60.470 -999.990 ... R5 2001 08 20 11 45 00 -46.4337 51.8478 202.00 197.00 5.00 47323 CRZ 2001 06 28 09 55 00 145-98 P co CCGG 92.080 -999.990 .X. R5 2002 01 07 09 42 00 -46.4337 51.8478 202.00 197.00 5.00 47324 CRZ 2001 06 28 09 55 00 146-98 P co CCGG 91.900 -999.990 .X. R5 2002 01 07 09 55 00 -46.4337 51.8478 202.00 197.00 5.00 47325 CRZ 2001 07 04 10 04 00 4369-91 P co CCGG 58.030 -999.990 ... R5 2002 01 07 11 02 00 -46.4337 51.8478 202.00 197.00 5.00 47326 CRZ 2001 07 04 10 04 00 4370-91 P co CCGG 58.480 -999.990 ... R5 2002 01 07 11 15 00 -46.4337 51.8478 202.00 197.00 5.00 47327 CRZ 2001 07 22 08 35 00 4849-98 P co CCGG 60.670 -999.990 ... R5 2002 01 07 10 47 00 -46.4337 51.8478 202.00 197.00 5.00 47328 CRZ 2001 07 31 03 40 00 4081-91 P co CCGG 62.870 -999.990 ... R5 2002 01 07 10 08 00 -46.4337 51.8478 202.00 197.00 5.00 47329 CRZ 2001 07 31 03 40 00 4082-91 P co CCGG 63.720 -999.990 ... R5 2002 01 07 10 21 00 -46.4337 51.8478 202.00 197.00 5.00 47330 CRZ 2001 08 09 07 33 00 4305-91 P co CCGG 71.210 -999.990 ... R5 2002 01 07 11 28 00 -46.4337 51.8478 202.00 197.00 5.00 47331 CRZ 2001 08 09 07 33 00 4306-91 P co CCGG 69.610 -999.990 .N. R5 2002 01 07 11 41 00 -46.4337 51.8478 202.00 197.00 5.00 47332 CRZ 2001 08 20 09 30 00 267-91 P co CCGG 66.650 -999.990 ... R5 2002 01 07 12 48 00 -46.4337 51.8478 202.00 197.00 5.00 47333 CRZ 2001 08 20 09 30 00 268-91 P co CCGG 67.920 -999.990 ... R5 2002 01 07 13 01 00 -46.4337 51.8478 202.00 197.00 5.00 47334 CRZ 2001 08 30 10 18 00 709-91 P co CCGG 65.920 -999.990 ... R5 2002 01 07 12 22 00 -46.4337 51.8478 202.00 197.00 5.00 47335 CRZ 2001 08 30 10 18 00 710-91 P co CCGG 65.210 -999.990 ... R5 2002 01 07 12 35 00 -46.4337 51.8478 202.00 197.00 5.00 47336 CRZ 2001 09 16 11 15 00 701-91 P co CCGG 69.250 -999.990 ... R5 2002 01 07 13 43 00 -46.4337 51.8478 202.00 197.00 5.00 47337 CRZ 2001 09 16 11 15 00 702-91 P co CCGG 69.200 -999.990 ... R5 2002 01 07 13 56 00 -46.4337 51.8478 202.00 197.00 5.00 47338 CRZ 2001 09 23 06 40 00 4389-91 P co CCGG 67.810 -999.990 ... R5 2002 01 07 14 35 00 -46.4337 51.8478 202.00 197.00 5.00 47339 CRZ 2001 09 23 06 40 00 4390-91 P co CCGG 68.610 -999.990 ... R5 2002 01 07 14 48 00 -46.4337 51.8478 202.00 197.00 5.00 47340 CRZ 2001 09 30 11 08 00 1391-91 P co CCGG 67.150 -999.990 ... R5 2002 01 07 14 09 00 -46.4337 51.8478 202.00 197.00 5.00 47341 CRZ 2001 09 30 11 08 00 1392-91 P co CCGG 66.950 -999.990 ... R5 2002 01 07 14 22 00 -46.4337 51.8478 202.00 197.00 5.00 47342 CRZ 2001 10 08 04 20 00 4521-91 P co CCGG 70.890 -999.990 ... R5 2002 01 07 13 14 00 -46.4337 51.8478 202.00 197.00 5.00 47343 CRZ 2001 10 08 04 20 00 4522-91 P co CCGG 68.470 -999.990 ... R5 2002 01 07 13 27 00 -46.4337 51.8478 202.00 197.00 5.00 47344 CRZ 2001 10 16 04 25 00 4895-91 P co CCGG 66.670 -999.990 ... R5 2002 01 07 11 56 00 -46.4337 51.8478 202.00 197.00 5.00 47345 CRZ 2001 10 16 04 25 00 4896-91 P co CCGG 66.920 -999.990 ... R5 2002 01 07 12 09 00 -46.4337 51.8478 202.00 197.00 5.00 47346 CRZ 2002 03 11 10 50 00 4979-91 P co CCGG 49.380 -999.990 ... R5 2003 01 06 11 16 00 -46.4337 51.8478 202.00 197.00 5.00 47347 CRZ 2002 03 11 10 50 00 4980-91 P co CCGG 47.530 -999.990 ... R5 2003 01 06 11 29 00 -46.4337 51.8478 202.00 197.00 5.00 47348 CRZ 2002 03 25 09 46 00 4541-91 P co CCGG 45.950 -999.990 ... R5 2003 01 06 12 44 00 -46.4337 51.8478 202.00 197.00 5.00 47349 CRZ 2002 03 25 09 46 00 4542-91 P co CCGG 44.910 -999.990 ... R5 2003 01 06 12 57 00 -46.4337 51.8478 202.00 197.00 5.00 47350 CRZ 2002 04 10 07 28 00 4177-91 P co CCGG 51.650 -999.990 P.. R5 2003 01 06 09 56 00 -46.4337 51.8478 202.00 197.00 5.00 47351 CRZ 2002 04 10 07 28 00 4178-91 P co CCGG 55.420 -999.990 P.. R5 2003 01 06 10 09 00 -46.4337 51.8478 202.00 197.00 5.00 47352 CRZ 2002 04 19 12 15 00 445-91 P co CCGG 52.830 -999.990 ... R5 2003 01 07 11 21 00 -46.4337 51.8478 202.00 197.00 5.00 47353 CRZ 2002 04 28 10 52 00 239-91 P co CCGG 51.350 -999.990 ... R5 2003 01 06 13 10 00 -46.4337 51.8478 202.00 197.00 5.00 47354 CRZ 2002 04 28 10 52 00 240-91 P co CCGG 50.550 -999.990 ... R5 2003 01 06 13 23 00 -46.4337 51.8478 202.00 197.00 5.00 47355 CRZ 2002 05 12 11 07 00 161-91 P co CCGG 52.360 -999.990 ... R5 2003 01 06 10 22 00 -46.4337 51.8478 202.00 197.00 5.00 47356 CRZ 2002 05 12 11 07 00 162-91 P co CCGG 52.570 -999.990 ... R5 2003 01 06 10 35 00 -46.4337 51.8478 202.00 197.00 5.00 47357 CRZ 2002 05 21 11 40 00 1679-91 P co CCGG 69.380 -999.990 .X. R5 2003 01 06 10 50 00 -46.4337 51.8478 202.00 197.00 5.00 47358 CRZ 2002 05 21 11 40 00 1680-91 P co CCGG 69.640 -999.990 .X. R5 2003 01 06 11 03 00 -46.4337 51.8478 202.00 197.00 5.00 47359 CRZ 2002 05 31 07 10 00 589-91 P co CCGG 58.150 -999.990 P.. R5 2003 01 06 09 30 00 -46.4337 51.8478 202.00 197.00 5.00 47360 CRZ 2002 05 31 07 10 00 590-91 P co CCGG 54.520 -999.990 P.. R5 2003 01 06 09 43 00 -46.4337 51.8478 202.00 197.00 5.00 47361 CRZ 2002 06 18 10 57 00 4813-91 P co CCGG 59.460 -999.990 ... R5 2002 11 14 14 13 00 -46.4337 51.8478 202.00 197.00 5.00 47362 CRZ 2002 06 18 10 57 00 4814-91 P co CCGG 59.550 -999.990 ... R5 2002 11 14 14 26 00 -46.4337 51.8478 202.00 197.00 5.00 47363 CRZ 2002 06 29 11 13 00 4065-91 P co CCGG 82.300 -999.990 P.. R5 2002 11 15 15 44 00 -46.4337 51.8478 202.00 197.00 5.00 47364 CRZ 2002 06 29 11 13 00 4066-91 P co CCGG 57.730 -999.990 P.. R5 2002 11 15 15 57 00 -46.4337 51.8478 202.00 197.00 5.00 47365 CRZ 2002 07 06 10 45 00 1509-91 P co CCGG 61.010 -999.990 ... R5 2002 11 14 13 19 00 -46.4337 51.8478 202.00 197.00 5.00 47366 CRZ 2002 07 06 10 45 00 1510-91 P co CCGG 60.030 -999.990 ... R5 2002 11 14 13 32 00 -46.4337 51.8478 202.00 197.00 5.00 47367 CRZ 2002 07 22 09 29 00 1865-91 P co CCGG 61.080 -999.990 ... R5 2002 11 15 16 10 00 -46.4337 51.8478 202.00 197.00 5.00 47368 CRZ 2002 07 22 09 29 00 1866-91 P co CCGG 61.060 -999.990 ... R5 2002 11 15 16 23 00 -46.4337 51.8478 202.00 197.00 5.00 47369 CRZ 2002 07 31 09 58 00 1077-91 P co CCGG 62.530 -999.990 ... R5 2002 11 14 12 27 00 -46.4337 51.8478 202.00 197.00 5.00 47370 CRZ 2002 07 31 09 58 00 1078-91 P co CCGG 63.410 -999.990 ... R5 2002 11 14 12 40 00 -46.4337 51.8478 202.00 197.00 5.00 47371 CRZ 2002 08 07 10 40 00 647-91 P co CCGG 66.190 -999.990 ... R5 2002 11 14 13 47 00 -46.4337 51.8478 202.00 197.00 5.00 47372 CRZ 2002 08 07 10 40 00 648-91 P co CCGG 67.200 -999.990 ... R5 2002 11 14 14 00 00 -46.4337 51.8478 202.00 197.00 5.00 47373 CRZ 2002 08 15 12 13 00 311-99 P co CCGG 69.740 -999.990 ... R5 2003 07 10 09 59 00 -46.4337 51.8478 202.00 197.00 5.00 47374 CRZ 2002 08 15 12 13 00 312-99 P co CCGG 72.080 -999.990 ... R5 2003 07 10 10 12 00 -46.4337 51.8478 202.00 197.00 5.00 47375 CRZ 2002 08 21 09 20 00 1809-91 P co CCGG 80.920 -999.990 .X. R5 2003 07 10 09 33 00 -46.4337 51.8478 202.00 197.00 5.00 47376 CRZ 2002 08 21 09 20 00 1810-91 P co CCGG 80.940 -999.990 .X. R5 2003 07 10 09 46 00 -46.4337 51.8478 202.00 197.00 5.00 47377 CRZ 2002 08 23 11 55 00 287-99 P co CCGG 82.760 -999.990 .X. R5 2003 07 15 11 52 00 -46.4337 51.8478 202.00 197.00 5.00 47378 CRZ 2002 08 23 11 55 00 288-99 P co CCGG 84.510 -999.990 .X. R5 2003 07 15 12 06 00 -46.4337 51.8478 202.00 197.00 5.00 47379 CRZ 2002 09 05 10 57 00 1315-91 P co CCGG 69.570 -999.990 P.. R5 2003 07 15 12 46 00 -46.4337 51.8478 202.00 197.00 5.00 47380 CRZ 2002 09 05 10 57 00 1316-91 P co CCGG 78.960 -999.990 P.. R5 2003 07 15 13 00 00 -46.4337 51.8478 202.00 197.00 5.00 47381 CRZ 2002 09 21 12 23 00 4909-91 P co CCGG 74.570 -999.990 ... R5 2003 07 15 11 00 00 -46.4337 51.8478 202.00 197.00 5.00 47382 CRZ 2002 09 21 12 23 00 4910-91 P co CCGG 76.950 -999.990 ... R5 2003 07 15 11 13 00 -46.4337 51.8478 202.00 197.00 5.00 47383 CRZ 2002 09 29 11 11 00 257-99 P co CCGG 75.160 -999.990 P.. R5 2003 07 15 10 34 00 -46.4337 51.8478 202.00 197.00 5.00 47384 CRZ 2002 09 29 11 11 00 258-99 P co CCGG 71.270 -999.990 P.. R5 2003 07 15 10 47 00 -46.4337 51.8478 202.00 197.00 5.00 47385 CRZ 2002 10 11 10 53 00 443-99 P co CCGG 76.360 -999.990 ... R5 2003 07 15 12 20 00 -46.4337 51.8478 202.00 197.00 5.00 47386 CRZ 2002 10 11 10 53 00 444-99 P co CCGG 77.700 -999.990 ... R5 2003 07 15 12 33 00 -46.4337 51.8478 202.00 197.00 5.00 47387 CRZ 2002 10 21 12 00 00 229-91 P co CCGG 75.380 -999.990 ... R5 2003 07 15 13 39 00 -46.4337 51.8478 202.00 197.00 5.00 47388 CRZ 2002 10 21 12 00 00 230-91 P co CCGG 73.120 -999.990 ... R5 2003 07 15 13 52 00 -46.4337 51.8478 202.00 197.00 5.00 47389 CRZ 2002 10 31 12 13 00 499-91 P co CCGG 77.620 -999.990 P.. R5 2003 07 18 10 17 00 -46.4337 51.8478 202.00 197.00 5.00 47390 CRZ 2002 10 31 12 13 00 500-91 P co CCGG 71.500 -999.990 P.. R5 2003 07 18 10 30 00 -46.4337 51.8478 202.00 197.00 5.00 47391 CRZ 2002 11 10 11 06 00 969-91 P co CCGG 554.250 -999.990 P.C R5 2003 07 18 09 49 00 -46.4337 51.8478 202.00 197.00 5.00 47392 CRZ 2002 11 10 11 06 00 970-91 P co CCGG 68.550 -999.990 P.. R5 2003 07 18 10 02 00 -46.4337 51.8478 202.00 197.00 5.00 47393 CRZ 2002 11 28 12 07 00 279-99 P co CCGG 73.380 -999.990 P.. R5 2003 07 18 12 03 00 -46.4337 51.8478 202.00 197.00 5.00 47394 CRZ 2002 11 28 12 07 00 280-99 P co CCGG 68.710 -999.990 P.. R5 2003 07 18 12 16 00 -46.4337 51.8478 202.00 197.00 5.00 47395 CRZ 2002 11 30 10 50 00 833-91 P co CCGG 66.840 -999.990 P.. R5 2003 07 18 08 56 00 -46.4337 51.8478 202.00 197.00 5.00 47396 CRZ 2002 11 30 10 50 00 834-91 P co CCGG 63.560 -999.990 P.. R5 2003 07 18 09 10 00 -46.4337 51.8478 202.00 197.00 5.00 47397 CRZ 2002 12 06 12 00 00 965-91 P co CCGG 63.860 -999.990 ... R5 2003 07 18 09 23 00 -46.4337 51.8478 202.00 197.00 5.00 47398 CRZ 2002 12 06 12 00 00 966-91 P co CCGG 64.230 -999.990 ... R5 2003 07 18 09 36 00 -46.4337 51.8478 202.00 197.00 5.00 47399 CRZ 2002 12 12 09 35 00 4333-91 P co CCGG 64.800 -999.990 ... R5 2003 07 18 10 43 00 -46.4337 51.8478 202.00 197.00 5.00 47400 CRZ 2002 12 12 09 35 00 4334-91 P co CCGG 64.890 -999.990 ... R5 2003 07 18 10 56 00 -46.4337 51.8478 202.00 197.00 5.00 47401 CRZ 2002 12 20 07 10 00 1725-91 P co CCGG 58.910 -999.990 P.. R5 2003 07 18 11 11 00 -46.4337 51.8478 202.00 197.00 5.00 47402 CRZ 2002 12 20 07 10 00 1726-91 P co CCGG 64.830 -999.990 P.. R5 2003 07 18 11 24 00 -46.4337 51.8478 202.00 197.00 5.00 47403 CRZ 2002 12 30 09 25 00 277-99 P co CCGG 61.060 -999.990 P.. R5 2003 07 18 11 37 00 -46.4337 51.8478 202.00 197.00 5.00 47404 CRZ 2002 12 30 09 25 00 278-99 P co CCGG 57.270 -999.990 P.. R5 2003 07 18 11 50 00 -46.4337 51.8478 202.00 197.00 5.00 47405 CRZ 2003 01 07 13 25 00 4815-91 P co CCGG 58.490 -999.990 ... R5 2003 07 21 13 14 00 -46.4337 51.8478 202.00 197.00 5.00 47406 CRZ 2003 01 07 13 25 00 4816-91 P co CCGG 57.990 -999.990 ... R5 2003 07 21 13 27 00 -46.4337 51.8478 202.00 197.00 5.00 47407 CRZ 2003 01 19 07 15 00 831-91 P co CCGG 52.630 -999.990 ... R5 2003 07 21 11 54 00 -46.4337 51.8478 202.00 197.00 5.00 47408 CRZ 2003 01 19 07 15 00 832-91 P co CCGG 54.550 -999.990 ... R5 2003 07 21 12 07 00 -46.4337 51.8478 202.00 197.00 5.00 47409 CRZ 2003 01 28 09 29 00 4709-91 P co CCGG 58.040 -999.990 ... R5 2003 07 18 16 01 00 -46.4337 51.8478 202.00 197.00 5.00 47410 CRZ 2003 01 28 09 29 00 4710-91 P co CCGG 55.660 -999.990 ... R5 2003 07 18 16 14 00 -46.4337 51.8478 202.00 197.00 5.00 47411 CRZ 2003 02 05 11 15 00 545-99 P co CCGG 57.670 -999.990 P.. R5 2003 07 21 11 28 00 -46.4337 51.8478 202.00 197.00 5.00 47412 CRZ 2003 02 05 11 15 00 546-99 P co CCGG 51.420 -999.990 P.. R5 2003 07 21 11 41 00 -46.4337 51.8478 202.00 197.00 5.00 47413 CRZ 2003 02 14 09 40 00 1303-91 P co CCGG 50.770 -999.990 ... R5 2003 07 18 15 09 00 -46.4337 51.8478 202.00 197.00 5.00 47414 CRZ 2003 02 14 09 40 00 1304-91 P co CCGG 49.340 -999.990 ... R5 2003 07 18 15 22 00 -46.4337 51.8478 202.00 197.00 5.00 47415 CRZ 2003 02 26 11 35 00 317-91 P co CCGG 49.410 -999.990 ... R5 2003 07 18 15 35 00 -46.4337 51.8478 202.00 197.00 5.00 47416 CRZ 2003 02 26 11 35 00 318-91 P co CCGG 48.230 -999.990 ... R5 2003 07 18 15 48 00 -46.4337 51.8478 202.00 197.00 5.00 47417 CRZ 2003 03 12 11 15 00 1349-91 P co CCGG 55.410 -999.990 P.. R5 2003 07 18 14 15 00 -46.4337 51.8478 202.00 197.00 5.00 47418 CRZ 2003 03 12 11 15 00 1350-91 P co CCGG 49.940 -999.990 P.. R5 2003 07 18 14 28 00 -46.4337 51.8478 202.00 197.00 5.00 47419 CRZ 2003 03 22 10 45 00 4305-91 P co CCGG 48.910 -999.990 ... R5 2003 07 18 14 43 00 -46.4337 51.8478 202.00 197.00 5.00 47420 CRZ 2003 03 22 10 45 00 4306-91 P co CCGG 48.060 -999.990 ... R5 2003 07 18 14 56 00 -46.4337 51.8478 202.00 197.00 5.00 47421 CRZ 2003 04 05 13 35 00 4513-91 P co CCGG 51.060 -999.990 P.. R5 2003 12 24 10 14 00 -46.4337 51.8478 202.00 197.00 5.00 47422 CRZ 2003 04 05 13 35 00 4514-91 P co CCGG 46.540 -999.990 P.. R5 2003 12 24 10 27 00 -46.4337 51.8478 202.00 197.00 5.00 47423 CRZ 2003 04 19 11 00 00 183-91 P co CCGG 51.130 -999.990 ... R5 2003 12 24 11 07 00 -46.4337 51.8478 202.00 197.00 5.00 47424 CRZ 2003 04 19 11 00 00 184-91 P co CCGG 51.070 -999.990 ... R5 2003 12 24 11 20 00 -46.4337 51.8478 202.00 197.00 5.00 47425 CRZ 2003 05 01 10 25 00 1573-91 P co CCGG 56.960 -999.990 P.. R5 2003 12 23 17 15 00 -46.4337 51.8478 202.00 197.00 5.00 47426 CRZ 2003 05 01 10 25 00 1574-91 P co CCGG 49.360 -999.990 P.. R5 2003 12 23 17 28 00 -46.4337 51.8478 202.00 197.00 5.00 47427 CRZ 2003 05 13 07 15 00 169-98 P co CCGG 52.240 -999.990 ... R5 2003 12 24 10 41 00 -46.4337 51.8478 202.00 197.00 5.00 47428 CRZ 2003 05 13 07 15 00 170-98 P co CCGG 52.110 -999.990 ... R5 2003 12 24 10 54 00 -46.4337 51.8478 202.00 197.00 5.00 47429 CRZ 2003 05 25 07 30 00 89-99 P co CCGG 52.230 -999.990 ... R5 2003 12 30 13 25 00 -46.4337 51.8478 202.00 197.00 5.00 47430 CRZ 2003 05 25 07 30 00 90-99 P co CCGG 51.700 -999.990 ... R5 2003 12 30 13 38 00 -46.4337 51.8478 202.00 197.00 5.00 47431 CRZ 2003 06 05 06 25 00 4389-91 P co CCGG 55.390 -999.990 ... R5 2003 12 30 13 51 00 -46.4337 51.8478 202.00 197.00 5.00 47432 CRZ 2003 06 05 06 25 00 4390-91 P co CCGG 53.430 -999.990 ... R5 2003 12 30 14 04 00 -46.4337 51.8478 202.00 197.00 5.00 47433 CRZ 2003 06 18 11 40 00 63-91 P co CCGG 59.260 -999.990 ... R5 2003 12 30 12 33 00 -46.4337 51.8478 202.00 197.00 5.00 47434 CRZ 2003 06 18 11 40 00 64-91 P co CCGG 56.530 -999.990 ... R5 2003 12 30 12 46 00 -46.4337 51.8478 202.00 197.00 5.00 47435 CRZ 2003 07 02 07 00 00 2015-91 P co CCGG 58.780 -999.990 ... R5 2003 12 30 12 59 00 -46.4337 51.8478 202.00 197.00 5.00 47436 CRZ 2003 07 02 07 00 00 2016-91 P co CCGG 57.240 -999.990 ... R5 2003 12 30 13 12 00 -46.4337 51.8478 202.00 197.00 5.00 47437 CRZ 2003 07 10 07 40 00 567-99 P co CCGG 61.950 -999.990 ... R5 2003 12 22 14 14 00 -46.4337 51.8478 202.00 197.00 5.00 47438 CRZ 2003 07 10 07 40 00 568-99 P co CCGG 61.370 -999.990 ... R5 2003 12 22 14 27 00 -46.4337 51.8478 202.00 197.00 5.00 47439 CRZ 2003 07 19 07 00 00 1025-91 P co CCGG 61.210 -999.990 ... R5 2003 12 22 14 40 00 -46.4337 51.8478 202.00 197.00 5.00 47440 CRZ 2003 07 19 07 00 00 1026-91 P co CCGG 59.810 -999.990 ... R5 2003 12 22 14 53 00 -46.4337 51.8478 202.00 197.00 5.00 47441 CRZ 2003 07 27 05 50 00 1461-91 P co CCGG 61.020 -999.990 ... R5 2003 12 22 12 28 00 -46.4337 51.8478 202.00 197.00 5.00 47442 CRZ 2003 07 27 05 50 00 1462-91 P co CCGG 60.200 -999.990 ... R5 2003 12 22 12 41 00 -46.4337 51.8478 202.00 197.00 5.00 47443 CRZ 2003 08 01 11 20 00 4139-91 P co CCGG 64.750 -999.990 ... R5 2003 12 22 12 01 00 -46.4337 51.8478 202.00 197.00 5.00 47444 CRZ 2003 08 01 11 20 00 4140-91 P co CCGG 64.340 -999.990 ... R5 2003 12 22 12 15 00 -46.4337 51.8478 202.00 197.00 5.00 47445 CRZ 2003 08 07 05 50 00 581-91 P co CCGG 66.340 -999.990 ... R5 2003 12 30 15 11 00 -46.4337 51.8478 202.00 197.00 5.00 47446 CRZ 2003 08 07 05 50 00 582-91 P co CCGG 65.630 -999.990 ... R5 2003 12 30 15 24 00 -46.4337 51.8478 202.00 197.00 5.00 47447 CRZ 2003 08 12 04 50 00 171-91 P co CCGG 63.850 -999.990 ... R5 2003 12 30 15 37 00 -46.4337 51.8478 202.00 197.00 5.00 47448 CRZ 2003 08 12 04 50 00 172-91 P co CCGG 62.500 -999.990 ... R5 2003 12 30 15 50 00 -46.4337 51.8478 202.00 197.00 5.00 47449 CRZ 2003 08 21 04 30 00 4929-91 P co CCGG 65.510 -999.990 ... R5 2003 12 30 14 45 00 -46.4337 51.8478 202.00 197.00 5.00 47450 CRZ 2003 08 21 04 30 00 4930-91 P co CCGG 65.760 -999.990 ... R5 2003 12 30 14 58 00 -46.4337 51.8478 202.00 197.00 5.00 47451 CRZ 2003 08 27 03 23 00 1117-91 P co CCGG 88.320 -999.990 .X. R5 2003 12 30 14 19 00 -46.4337 51.8478 202.00 197.00 5.00 47452 CRZ 2003 08 27 03 23 00 1118-91 P co CCGG 87.780 -999.990 .X. R5 2003 12 30 14 32 00 -46.4337 51.8478 202.00 197.00 5.00 47453 CRZ 2003 09 06 07 15 00 871-99 P co CCGG 69.300 -999.990 ... R5 2003 12 22 12 54 00 -46.4337 51.8478 202.00 197.00 5.00 47454 CRZ 2003 09 06 07 15 00 872-99 P co CCGG 71.990 -999.990 ... R5 2003 12 22 13 07 00 -46.4337 51.8478 202.00 197.00 5.00 47455 CRZ 2003 09 14 03 00 00 1473-99 P co CCGG 70.790 -999.990 ... R5 2003 12 22 13 20 00 -46.4337 51.8478 202.00 197.00 5.00 47456 CRZ 2003 09 14 03 00 00 1474-99 P co CCGG 69.220 -999.990 ... R5 2003 12 22 13 33 00 -46.4337 51.8478 202.00 197.00 5.00 47457 CRZ 2003 09 21 13 30 00 817-99 P co CCGG 73.900 -999.990 P.. R5 2003 12 22 11 29 00 -46.4337 51.8478 202.00 197.00 5.00 47458 CRZ 2003 09 21 13 30 00 818-99 P co CCGG 70.290 -999.990 P.. R5 2003 12 22 11 42 00 -46.4337 51.8478 202.00 197.00 5.00 47459 CRZ 2003 09 29 05 15 00 4947-91 P co CCGG 70.930 -999.990 ... R5 2003 12 29 11 32 00 -46.4337 51.8478 202.00 197.00 5.00 47460 CRZ 2003 09 29 05 15 00 4948-91 P co CCGG 72.930 -999.990 ... R5 2003 12 29 11 45 00 -46.4337 51.8478 202.00 197.00 5.00 47461 CRZ 2003 10 04 07 35 00 857-91 P co CCGG 72.580 -999.990 P.. R5 2003 12 22 11 03 00 -46.4337 51.8478 202.00 197.00 5.00 47462 CRZ 2003 10 04 07 35 00 858-91 P co CCGG 69.530 -999.990 P.. R5 2003 12 22 11 16 00 -46.4337 51.8478 202.00 197.00 5.00 47463 CRZ 2003 10 10 03 00 00 895-99 P co CCGG 67.550 -999.990 ... R5 2003 12 29 11 58 00 -46.4337 51.8478 202.00 197.00 5.00 47464 CRZ 2003 10 10 03 00 00 896-99 P co CCGG 68.740 -999.990 ... R5 2003 12 29 12 11 00 -46.4337 51.8478 202.00 197.00 5.00 47465 CRZ 2003 10 18 11 57 00 1019-99 P co CCGG 65.750 -999.990 ... R5 2003 12 22 15 34 00 -46.4337 51.8478 202.00 197.00 5.00 47466 CRZ 2003 10 18 11 57 00 1020-99 P co CCGG 64.270 -999.990 ... R5 2003 12 22 15 47 00 -46.4337 51.8478 202.00 197.00 5.00 47467 CRZ 2003 10 24 09 15 00 703-91 P co CCGG 100.330 -999.990 P.. R5 2003 12 29 11 06 00 -46.4337 51.8478 202.00 197.00 5.00 47468 CRZ 2003 10 24 09 15 00 704-91 P co CCGG 69.560 -999.990 P.. R5 2003 12 29 11 19 00 -46.4337 51.8478 202.00 197.00 5.00 47469 CRZ 2003 11 03 09 25 00 1259-99 P co CCGG 65.990 -999.990 ... R5 2004 02 25 14 36 00 -46.4337 51.8478 202.00 197.00 5.00 47470 CRZ 2003 11 03 09 25 00 1260-99 P co CCGG 65.060 -999.990 ... R5 2004 02 25 14 49 00 -46.4337 51.8478 202.00 197.00 5.00 47471 CRZ 2003 11 07 02 50 00 1077-91 P co CCGG 62.380 -999.990 ... R5 2004 02 25 15 02 00 -46.4337 51.8478 202.00 197.00 5.00 47472 CRZ 2003 11 07 02 50 00 1078-91 P co CCGG 62.770 -999.990 ... R5 2004 02 25 15 15 00 -46.4337 51.8478 202.00 197.00 5.00 47473 CRZ 2003 11 13 04 45 00 1021-99 P co CCGG 58.470 -999.990 ... R5 2004 02 25 13 42 00 -46.4337 51.8478 202.00 197.00 5.00 47474 CRZ 2003 11 13 04 45 00 1022-99 P co CCGG 58.820 -999.990 ... R5 2004 02 25 13 55 00 -46.4337 51.8478 202.00 197.00 5.00 47475 CRZ 2003 11 21 02 25 00 127-91 P co CCGG 59.040 -999.990 ... R5 2004 02 25 14 08 00 -46.4337 51.8478 202.00 197.00 5.00 47476 CRZ 2003 11 21 02 25 00 128-91 P co CCGG 58.990 -999.990 ... R5 2004 02 25 14 21 00 -46.4337 51.8478 202.00 197.00 5.00 47477 CRZ 2003 12 01 06 20 00 4283-91 P co CCGG 56.810 -999.990 ... R5 2004 02 25 13 16 00 -46.4337 51.8478 202.00 197.00 5.00 47478 CRZ 2003 12 01 06 20 00 4284-91 P co CCGG 56.880 -999.990 ... R5 2004 02 25 13 29 00 -46.4337 51.8478 202.00 197.00 5.00 47479 CRZ 2003 12 10 06 00 00 677-91 P co CCGG 52.660 -999.990 ... R5 2004 02 25 12 50 00 -46.4337 51.8478 202.00 197.00 5.00 47480 CRZ 2003 12 10 06 00 00 678-91 P co CCGG 53.030 -999.990 ... R5 2004 02 25 13 03 00 -46.4337 51.8478 202.00 197.00 5.00 47481 CRZ 2003 12 17 11 15 00 311-91 P co CCGG 53.400 -999.990 ... R5 2004 02 25 12 18 00 -46.4337 51.8478 202.00 197.00 5.00 47482 CRZ 2003 12 17 11 15 00 312-91 P co CCGG 52.910 -999.990 ... R5 2004 02 25 12 31 00 -46.4337 51.8478 202.00 197.00 5.00 47483 CRZ 2003 12 27 06 40 00 185-98 P co CCGG 49.780 -999.990 ... R5 2004 02 25 11 52 00 -46.4337 51.8478 202.00 197.00 5.00 47484 CRZ 2003 12 27 06 40 00 186-98 P co CCGG 49.570 -999.990 ... R5 2004 02 25 12 05 00 -46.4337 51.8478 202.00 197.00 5.00 47485 CRZ 2004 01 04 15 25 00 41-98 P co CCGG 56.030 -999.990 P.. R5 2004 10 14 13 06 00 -46.4337 51.8478 202.00 197.00 5.00 190060 CRZ 2004 01 04 15 25 00 42-98 P co CCGG 52.000 -999.990 P.. R5 2004 10 14 13 20 00 -46.4337 51.8478 202.00 197.00 5.00 190061 CRZ 2004 01 19 07 15 00 985-91 P co CCGG 50.290 -999.990 ... R5 2004 10 14 12 38 00 -46.4337 51.8478 202.00 197.00 5.00 190058 CRZ 2004 01 19 07 15 00 986-91 P co CCGG 49.370 -999.990 ... R5 2004 10 14 12 52 00 -46.4337 51.8478 202.00 197.00 5.00 190059 CRZ 2004 02 13 10 31 00 1193-99 P co CCGG 50.080 -999.990 ... R5 2004 10 14 12 09 00 -46.4337 51.8478 202.00 197.00 5.00 190056 CRZ 2004 02 13 10 31 00 1194-99 P co CCGG 46.440 -999.990 ... R5 2004 10 14 12 24 00 -46.4337 51.8478 202.00 197.00 5.00 190057 CRZ 2004 02 24 10 30 00 1128-99 P co CCGG 45.210 -999.990 ... R5 2004 10 14 14 31 00 -46.4337 51.8478 202.00 197.00 5.00 190055 CRZ 2004 03 03 12 05 00 705-99 P co CCGG 45.220 -999.990 ... R5 2004 10 14 15 55 00 -46.4337 51.8478 202.00 197.00 5.00 189998 CRZ 2004 03 03 12 05 00 706-99 P co CCGG 44.990 -999.990 ... R5 2004 10 14 16 09 00 -46.4337 51.8478 202.00 197.00 5.00 189999 CRZ 2004 03 11 13 50 00 1191-99 P co CCGG 43.250 -999.990 ... R5 2004 10 14 17 20 00 -46.4337 51.8478 202.00 197.00 5.00 190002 CRZ 2004 03 11 13 50 00 1192-99 P co CCGG 42.640 -999.990 ... R5 2004 10 14 17 34 00 -46.4337 51.8478 202.00 197.00 5.00 190003 CRZ 2004 03 24 06 21 00 1023-91 P co CCGG 44.370 -999.990 ... R5 2004 10 14 16 24 00 -46.4337 51.8478 202.00 197.00 5.00 190004 CRZ 2004 03 24 06 21 00 1024-91 P co CCGG 44.030 -999.990 ... R5 2004 10 14 16 38 00 -46.4337 51.8478 202.00 197.00 5.00 190005 CRZ 2004 04 05 06 50 00 345-99 P co CCGG 46.980 -999.990 ... R5 2004 10 14 16 52 00 -46.4337 51.8478 202.00 197.00 5.00 190006 CRZ 2004 04 05 06 50 00 346-99 P co CCGG 45.160 -999.990 ... R5 2004 10 14 17 06 00 -46.4337 51.8478 202.00 197.00 5.00 190007 CRZ 2004 04 13 06 40 00 2955-99 P co CCGG 47.860 -999.990 ... R5 2004 10 18 16 24 00 -46.4337 51.8478 202.00 197.00 5.00 190071 CRZ 2004 04 13 06 40 00 2956-99 P co CCGG 46.270 -999.990 ... R5 2004 10 18 16 38 00 -46.4337 51.8478 202.00 197.00 5.00 190072 CRZ 2004 04 20 06 25 00 2951-99 P co CCGG 48.450 -999.990 ... R5 2004 10 18 15 18 00 -46.4337 51.8478 202.00 197.00 5.00 190069 CRZ 2004 04 20 06 25 00 2952-99 P co CCGG 48.490 -999.990 ... R5 2004 10 18 15 32 00 -46.4337 51.8478 202.00 197.00 5.00 190070 CRZ 2004 04 27 10 10 00 2895-99 P co CCGG 48.620 -999.990 ... R5 2004 10 18 16 52 00 -46.4337 51.8478 202.00 197.00 5.00 190075 CRZ 2004 04 27 10 10 00 2896-99 P co CCGG 52.730 -999.990 ... R5 2004 10 18 17 06 00 -46.4337 51.8478 202.00 197.00 5.00 190076 CRZ 2004 05 04 06 30 00 2961-99 P co CCGG 49.120 -999.990 ... R5 2004 10 18 13 53 00 -46.4337 51.8478 202.00 197.00 5.00 190073 CRZ 2004 05 04 06 30 00 2962-99 P co CCGG 49.810 -999.990 ... R5 2004 10 18 14 07 00 -46.4337 51.8478 202.00 197.00 5.00 190074 CRZ 2004 05 20 06 35 00 2959-99 P co CCGG 50.480 -999.990 ... R5 2004 10 20 19 23 00 -46.4337 51.8478 202.00 197.00 5.00 190010 CRZ 2004 05 20 06 35 00 2960-99 P co CCGG 50.230 -999.990 ... R5 2004 10 20 19 37 00 -46.4337 51.8478 202.00 197.00 5.00 190011 CRZ 2004 05 26 11 03 00 2935-99 P co CCGG 51.330 -999.990 ... R5 2004 10 20 18 27 00 -46.4337 51.8478 202.00 197.00 5.00 190008 CRZ 2004 05 26 11 03 00 2936-99 P co CCGG 50.760 -999.990 ... R5 2004 10 20 18 41 00 -46.4337 51.8478 202.00 197.00 5.00 190009 CRZ 2004 06 02 11 29 00 2963-99 P co CCGG 54.140 -999.990 ... R5 2004 10 20 17 59 00 -46.4337 51.8478 202.00 197.00 5.00 190012 CRZ 2004 06 02 11 29 00 2964-99 P co CCGG 52.750 -999.990 ... R5 2004 10 20 18 13 00 -46.4337 51.8478 202.00 197.00 5.00 190013 CRZ 2004 06 09 11 00 00 2967-99 P co CCGG 55.620 -999.990 ... R5 2004 10 20 18 55 00 -46.4337 51.8478 202.00 197.00 5.00 190014 CRZ 2004 06 09 11 00 00 2968-99 P co CCGG 55.670 -999.990 ... R5 2004 10 20 19 09 00 -46.4337 51.8478 202.00 197.00 5.00 190015 CRZ 2004 06 17 07 06 00 2950-99 P co CCGG 53.330 -999.990 ... R5 2004 10 14 14 45 00 -46.4337 51.8478 202.00 197.00 5.00 190068 CRZ 2004 06 25 10 20 00 2883-99 P co CCGG 61.450 -999.990 ... R5 2004 10 14 14 59 00 -46.4337 51.8478 202.00 197.00 5.00 190064 CRZ 2004 06 25 10 20 00 2884-99 P co CCGG 60.610 -999.990 ... R5 2004 10 14 15 13 00 -46.4337 51.8478 202.00 197.00 5.00 190065 CRZ 2004 06 30 12 10 00 175-99 P co CCGG 57.090 -999.990 ... R5 2004 10 14 14 02 00 -46.4337 51.8478 202.00 197.00 5.00 190062 CRZ 2004 06 30 12 10 00 176-99 P co CCGG 58.810 -999.990 ... R5 2004 10 14 14 16 00 -46.4337 51.8478 202.00 197.00 5.00 190063 CRZ 2004 07 07 06 25 00 2947-99 P co CCGG 56.430 -999.990 ... R5 2004 10 14 15 27 00 -46.4337 51.8478 202.00 197.00 5.00 190066 CRZ 2004 07 07 06 25 00 2948-99 P co CCGG 56.820 -999.990 ... R5 2004 10 14 15 41 00 -46.4337 51.8478 202.00 197.00 5.00 190067 CRZ 2004 07 14 10 29 00 2929-99 P co CCGG 61.000 -999.990 ... R5 2004 10 18 14 50 00 -46.4337 51.8478 202.00 197.00 5.00 190117 CRZ 2004 07 14 10 29 00 2930-99 P co CCGG 57.840 -999.990 ... R5 2004 10 18 15 04 00 -46.4337 51.8478 202.00 197.00 5.00 190118 CRZ 2004 07 22 09 49 00 2931-99 P co CCGG 59.720 -999.990 ... R5 2004 10 18 14 21 00 -46.4337 51.8478 202.00 197.00 5.00 190119 CRZ 2004 07 22 09 49 00 2932-99 P co CCGG 58.750 -999.990 ... R5 2004 10 18 14 35 00 -46.4337 51.8478 202.00 197.00 5.00 190120 CRZ 2004 07 28 10 40 00 2885-99 P co CCGG 59.460 -999.990 ... R5 2004 10 18 12 00 00 -46.4337 51.8478 202.00 197.00 5.00 190121 CRZ 2004 07 28 10 40 00 2886-99 P co CCGG 59.440 -999.990 ... R5 2004 10 18 12 14 00 -46.4337 51.8478 202.00 197.00 5.00 190122 CRZ 2004 08 06 12 45 00 2887-99 P co CCGG 58.700 -999.990 ... R5 2004 10 18 12 28 00 -46.4337 51.8478 202.00 197.00 5.00 190123 CRZ 2004 08 06 12 45 00 2888-99 P co CCGG 60.080 -999.990 ... R5 2004 10 18 12 42 00 -46.4337 51.8478 202.00 197.00 5.00 190124 CRZ 2004 08 14 07 00 00 2891-99 P co CCGG 63.400 -999.990 ... R5 2005 01 26 10 33 00 -46.4337 51.8478 202.00 197.00 5.00 194341 CRZ 2004 08 14 07 00 00 2892-99 P co CCGG 63.440 -999.990 ... R5 2005 01 26 10 47 00 -46.4337 51.8478 202.00 197.00 5.00 194342 CRZ 2004 08 18 11 05 00 2881-99 P co CCGG 67.090 -999.990 ... R5 2005 01 26 11 01 00 -46.4337 51.8478 202.00 197.00 5.00 194339 CRZ 2004 08 18 11 05 00 2882-99 P co CCGG 67.430 -999.990 ... R5 2005 01 26 11 15 00 -46.4337 51.8478 202.00 197.00 5.00 194340 CRZ 2004 08 27 06 10 00 2893-99 P co CCGG 104.770 -999.990 P.. R5 2005 01 26 11 29 00 -46.4337 51.8478 202.00 197.00 5.00 194337 CRZ 2004 08 27 06 10 00 2894-99 P co CCGG 63.590 -999.990 P.. R5 2005 01 26 11 44 00 -46.4337 51.8478 202.00 197.00 5.00 194338 CRZ 2004 09 01 06 45 00 2925-99 P co CCGG 64.920 -999.990 ... R5 2005 01 26 10 05 00 -46.4337 51.8478 202.00 197.00 5.00 194335 CRZ 2004 09 01 06 45 00 2926-99 P co CCGG 64.620 -999.990 ... R5 2005 01 26 10 19 00 -46.4337 51.8478 202.00 197.00 5.00 194336 CRZ 2004 09 07 13 30 00 2899-99 P co CCGG -999.990 -999.990 P.C R5 2005 01 26 09 08 00 -46.4337 51.8478 202.00 197.00 5.00 194333 CRZ 2004 09 07 13 30 00 2900-99 P co CCGG 72.170 -999.990 P.. R5 2005 01 26 09 22 00 -46.4337 51.8478 202.00 197.00 5.00 194334 CRZ 2004 09 14 11 40 00 2889-99 P co CCGG 65.040 -999.990 ... R5 2005 01 25 14 17 00 -46.4337 51.8478 202.00 197.00 5.00 194331 CRZ 2004 09 14 11 40 00 2890-99 P co CCGG 64.600 -999.990 ... R5 2005 01 25 14 31 00 -46.4337 51.8478 202.00 197.00 5.00 194332 CRZ 2004 09 22 08 00 00 2965-99 P co CCGG 66.050 -999.990 ... R5 2005 01 26 09 37 00 -46.4337 51.8478 202.00 197.00 5.00 194327 CRZ 2004 09 22 08 00 00 2966-99 P co CCGG 65.990 -999.990 ... R5 2005 01 26 09 51 00 -46.4337 51.8478 202.00 197.00 5.00 194328 CRZ 2004 10 01 12 30 00 2901-99 P co CCGG 63.410 -999.990 ... R5 2005 01 25 13 20 00 -46.4337 51.8478 202.00 197.00 5.00 194329 CRZ 2004 10 01 12 30 00 2902-99 P co CCGG 65.510 -999.990 ... R5 2005 01 25 13 34 00 -46.4337 51.8478 202.00 197.00 5.00 194330 CRZ 2004 10 06 07 17 00 639-99 P co CCGG 68.750 -999.990 ... R5 2005 01 25 11 56 00 -46.4337 51.8478 202.00 197.00 5.00 194325 CRZ 2004 10 06 07 17 00 640-99 P co CCGG 70.460 -999.990 ... R5 2005 01 25 12 10 00 -46.4337 51.8478 202.00 197.00 5.00 194326 CRZ 2004 10 14 08 10 00 3767-99 P co CCGG 71.630 -999.990 ... R5 2005 01 25 10 08 00 -46.4337 51.8478 202.00 197.00 5.00 194323 CRZ 2004 10 14 08 10 00 3768-99 P co CCGG 70.820 -999.990 ... R5 2005 01 25 10 22 00 -46.4337 51.8478 202.00 197.00 5.00 194324 CRZ 2004 10 21 10 35 00 3763-99 P co CCGG 68.290 -999.990 ... R5 2005 01 25 08 43 00 -46.4337 51.8478 202.00 197.00 5.00 194321 CRZ 2004 10 21 10 35 00 3764-99 P co CCGG 67.390 -999.990 ... R5 2005 01 25 08 57 00 -46.4337 51.8478 202.00 197.00 5.00 194322 CRZ 2004 10 28 10 05 00 3761-99 P co CCGG 66.010 -999.990 ... R5 2005 01 25 09 11 00 -46.4337 51.8478 202.00 197.00 5.00 194319 CRZ 2004 10 28 10 05 00 3762-99 P co CCGG 66.260 -999.990 ... R5 2005 01 25 09 25 00 -46.4337 51.8478 202.00 197.00 5.00 194320 CRZ 2004 11 03 12 40 00 1-99 P co CCGG 65.950 -999.990 ... R5 2005 01 25 13 49 00 -46.4337 51.8478 202.00 197.00 5.00 194317 CRZ 2004 11 03 12 40 00 2-99 P co CCGG 66.800 -999.990 ... R5 2005 01 25 14 03 00 -46.4337 51.8478 202.00 197.00 5.00 194318 CRZ 2004 11 11 05 35 00 2453-99 P co CCGG 61.750 -999.990 ... R5 2005 01 25 12 24 00 -46.4337 51.8478 202.00 197.00 5.00 194315 CRZ 2004 11 11 05 35 00 2454-99 P co CCGG 62.780 -999.990 ... R5 2005 01 25 12 38 00 -46.4337 51.8478 202.00 197.00 5.00 194316 CRZ 2004 11 17 12 50 00 2013-99 P co CCGG 61.330 -999.990 ... R5 2005 01 25 10 59 00 -46.4337 51.8478 202.00 197.00 5.00 194313 CRZ 2004 11 17 12 50 00 2014-99 P co CCGG 60.560 -999.990 ... R5 2005 01 25 11 13 00 -46.4337 51.8478 202.00 197.00 5.00 194314 CRZ 2004 11 23 07 40 00 565-99 P co CCGG 65.010 -999.990 ... R5 2005 01 25 11 27 00 -46.4337 51.8478 202.00 197.00 5.00 194311 CRZ 2004 11 23 07 40 00 566-99 P co CCGG 64.350 -999.990 ... R5 2005 01 25 11 42 00 -46.4337 51.8478 202.00 197.00 5.00 194312 CRZ 2004 12 03 04 44 00 343-99 P co CCGG 58.610 -999.990 ... R5 2005 03 09 11 49 00 -46.4337 51.8478 202.00 197.00 5.00 196257 CRZ 2004 12 03 04 44 00 344-99 P co CCGG 57.010 -999.990 ... R5 2005 03 09 12 03 00 -46.4337 51.8478 202.00 197.00 5.00 196258 CRZ 2004 12 13 12 34 00 1813-99 P co CCGG 55.940 -999.990 ... R5 2005 03 09 09 28 00 -46.4337 51.8478 202.00 197.00 5.00 196255 CRZ 2004 12 13 12 34 00 1814-99 P co CCGG 56.570 -999.990 ... R5 2005 03 09 09 42 00 -46.4337 51.8478 202.00 197.00 5.00 196256 CRZ 2004 12 17 03 02 00 3205-99 P co CCGG 53.760 -999.990 ... R5 2005 03 09 09 56 00 -46.4337 51.8478 202.00 197.00 5.00 196251 CRZ 2004 12 17 03 02 00 3206-99 P co CCGG 52.310 -999.990 ... R5 2005 03 09 10 10 00 -46.4337 51.8478 202.00 197.00 5.00 196252 CRZ 2004 12 22 11 25 00 1755-99 P co CCGG 52.770 -999.990 ... R5 2005 03 09 10 24 00 -46.4337 51.8478 202.00 197.00 5.00 196253 CRZ 2004 12 22 11 25 00 1756-99 P co CCGG 52.020 -999.990 ... R5 2005 03 09 10 38 00 -46.4337 51.8478 202.00 197.00 5.00 196254 CRZ 2005 01 03 07 19 00 2497-99 P co CCGG 50.120 -999.990 ... R5 2005 03 10 10 04 00 -46.4337 51.8478 202.00 197.00 5.00 196237 CRZ 2005 01 03 07 19 00 2498-99 P co CCGG 50.450 -999.990 ... R5 2005 03 10 10 18 00 -46.4337 51.8478 202.00 197.00 5.00 196238 CRZ 2005 01 06 02 19 00 1741-99 P co CCGG 48.290 -999.990 ... R5 2005 03 10 09 36 00 -46.4337 51.8478 202.00 197.00 5.00 196235 CRZ 2005 01 06 02 19 00 1742-99 P co CCGG 49.490 -999.990 ... R5 2005 03 10 09 50 00 -46.4337 51.8478 202.00 197.00 5.00 196236 CRZ 2005 01 20 04 20 00 3115-99 P co CCGG 50.810 -999.990 ... R5 2005 03 09 15 35 00 -46.4337 51.8478 202.00 197.00 5.00 196241 CRZ 2005 01 20 04 20 00 3116-99 P co CCGG 50.730 -999.990 ... R5 2005 03 09 15 49 00 -46.4337 51.8478 202.00 197.00 5.00 196242 CRZ 2005 01 30 02 14 00 3347-99 P co CCGG 42.090 -999.990 ... R5 2005 03 09 15 06 00 -46.4337 51.8478 202.00 197.00 5.00 196239 CRZ 2005 01 30 02 14 00 3348-99 P co CCGG 42.140 -999.990 ... R5 2005 03 09 15 20 00 -46.4337 51.8478 202.00 197.00 5.00 196240 CRZ 2005 02 08 04 09 00 3203-99 P co CCGG 42.740 -999.990 ... R5 2005 04 06 13 02 00 -46.4337 51.8478 202.00 197.00 5.00 197340 CRZ 2005 02 08 04 09 00 3204-99 P co CCGG 43.220 -999.990 ... R5 2005 04 06 13 17 00 -46.4337 51.8478 202.00 197.00 5.00 197341 CRZ 2005 02 17 05 12 00 472-99 P co CCGG 42.240 -999.990 ... R5 2005 04 05 16 30 00 -46.4337 51.8478 202.00 197.00 5.00 197345 CRZ 2005 02 25 04 12 00 691-99 P co CCGG 46.060 -999.990 ... R5 2005 04 06 12 34 00 -46.4337 51.8478 202.00 197.00 5.00 197337 CRZ 2005 02 25 04 12 00 692-99 P co CCGG 44.450 -999.990 ... R5 2005 04 06 12 48 00 -46.4337 51.8478 202.00 197.00 5.00 197338 CRZ 2005 03 02 04 57 00 3841-99 P co CCGG 44.860 -999.990 ... R5 2005 04 06 10 13 00 -46.4337 51.8478 202.00 197.00 5.00 197348 CRZ 2005 03 02 04 57 00 3842-99 P co CCGG 44.310 -999.990 ... R5 2005 04 06 10 27 00 -46.4337 51.8478 202.00 197.00 5.00 197349 CRZ 2005 03 07 05 44 00 3765-99 P co CCGG 42.750 -999.990 ... R5 2005 04 06 09 17 00 -46.4337 51.8478 202.00 197.00 5.00 197350 CRZ 2005 03 07 05 44 00 3766-99 P co CCGG 42.150 -999.990 ... R5 2005 04 06 09 31 00 -46.4337 51.8478 202.00 197.00 5.00 197351 CRZ 2005 03 15 10 46 00 4175-99 P co CCGG 42.340 -999.990 ... R5 2005 04 06 09 45 00 -46.4337 51.8478 202.00 197.00 5.00 197346 CRZ 2005 03 15 10 46 00 4176-99 P co CCGG 41.750 -999.990 ... R5 2005 04 06 09 59 00 -46.4337 51.8478 202.00 197.00 5.00 197347 CRZ 2005 03 21 12 31 00 2230-99 P co CCGG 44.620 -999.990 ... R5 2005 04 05 16 44 00 -46.4337 51.8478 202.00 197.00 5.00 197344 CRZ 2005 03 30 11 42 00 1059-99 P co CCGG 45.730 -999.990 ... R5 2005 10 20 14 51 00 -46.4337 51.8478 202.00 197.00 5.00 207031 CRZ 2005 03 30 11 42 00 1060-99 P co CCGG 45.260 -999.990 ... R5 2005 10 20 15 05 00 -46.4337 51.8478 202.00 197.00 5.00 207032 CRZ 2005 04 07 10 48 00 3485-99 P co CCGG 48.240 -999.990 ... R5 2005 10 21 09 34 00 -46.4337 51.8478 202.00 197.00 5.00 207037 CRZ 2005 04 07 10 48 00 3486-99 P co CCGG 48.400 -999.990 ... R5 2005 10 21 09 49 00 -46.4337 51.8478 202.00 197.00 5.00 207038 CRZ 2005 04 12 13 07 00 4177-99 P co CCGG 47.300 -999.990 ... R5 2005 10 21 10 03 00 -46.4337 51.8478 202.00 197.00 5.00 207033 CRZ 2005 04 12 13 07 00 4178-99 P co CCGG 47.140 -999.990 ... R5 2005 10 21 10 17 00 -46.4337 51.8478 202.00 197.00 5.00 207034 CRZ 2005 04 22 05 38 00 2603-99 P co CCGG 46.280 -999.990 ... R5 2005 10 21 10 31 00 -46.4337 51.8478 202.00 197.00 5.00 207035 CRZ 2005 04 22 05 38 00 2604-99 P co CCGG 46.240 -999.990 ... R5 2005 10 21 10 46 00 -46.4337 51.8478 202.00 197.00 5.00 207036 CRZ 2005 04 27 07 46 00 1795-99 P co CCGG 47.750 -999.990 ... R5 2005 10 18 13 39 00 -46.4337 51.8478 202.00 197.00 5.00 207029 CRZ 2005 04 27 07 46 00 1796-99 P co CCGG 47.350 -999.990 ... R5 2005 10 18 13 53 00 -46.4337 51.8478 202.00 197.00 5.00 207030 CRZ 2005 05 04 06 01 00 3521-99 P co CCGG 48.660 -999.990 ... R5 2005 10 18 12 42 00 -46.4337 51.8478 202.00 197.00 5.00 207025 CRZ 2005 05 04 06 01 00 3522-99 P co CCGG 48.340 -999.990 ... R5 2005 10 18 12 56 00 -46.4337 51.8478 202.00 197.00 5.00 207026 CRZ 2005 05 09 11 16 00 3351-99 P co CCGG 56.390 -999.990 ... R5 2005 10 18 13 11 00 -46.4337 51.8478 202.00 197.00 5.00 207027 CRZ 2005 05 09 11 16 00 3352-99 P co CCGG 55.500 -999.990 ... R5 2005 10 18 13 25 00 -46.4337 51.8478 202.00 197.00 5.00 207028 CRZ 2005 05 21 11 26 00 269-99 P co CCGG 49.940 -999.990 ... R5 2005 10 18 12 14 00 -46.4337 51.8478 202.00 197.00 5.00 207023 CRZ 2005 05 21 11 26 00 270-99 P co CCGG 52.440 -999.990 ... R5 2005 10 18 12 28 00 -46.4337 51.8478 202.00 197.00 5.00 207024 CRZ 2005 05 25 07 00 00 2431-99 P co CCGG 51.880 -999.990 ... R5 2005 10 18 15 33 00 -46.4337 51.8478 202.00 197.00 5.00 207007 CRZ 2005 05 25 07 00 00 2432-99 P co CCGG 51.840 -999.990 ... R5 2005 10 18 15 47 00 -46.4337 51.8478 202.00 197.00 5.00 207008 CRZ 2005 05 30 05 47 00 2291-99 P co CCGG 52.700 -999.990 ... R5 2005 10 18 14 36 00 -46.4337 51.8478 202.00 197.00 5.00 207003 CRZ 2005 05 30 05 47 00 2292-99 P co CCGG 52.380 -999.990 ... R5 2005 10 18 14 50 00 -46.4337 51.8478 202.00 197.00 5.00 207004 CRZ 2005 06 09 11 38 00 3027-99 P co CCGG 55.800 -999.990 ... R5 2005 10 18 15 05 00 -46.4337 51.8478 202.00 197.00 5.00 207005 CRZ 2005 06 09 11 38 00 3028-99 P co CCGG 57.380 -999.990 ... R5 2005 10 18 15 19 00 -46.4337 51.8478 202.00 197.00 5.00 207006 CRZ 2005 06 15 04 19 00 2135-99 P co CCGG 54.350 -999.990 ... R5 2005 10 18 14 08 00 -46.4337 51.8478 202.00 197.00 5.00 207001 CRZ 2005 06 15 04 19 00 2136-99 P co CCGG 53.870 -999.990 ... R5 2005 10 18 14 22 00 -46.4337 51.8478 202.00 197.00 5.00 207002 CRZ 2005 06 22 05 50 00 2183-99 P co CCGG 56.990 -999.990 ... R5 2005 10 24 09 10 00 -46.4337 51.8478 202.00 197.00 5.00 207045 CRZ 2005 06 22 05 50 00 2184-99 P co CCGG 56.510 -999.990 ... R5 2005 10 24 09 24 00 -46.4337 51.8478 202.00 197.00 5.00 207046 CRZ 2005 06 29 05 20 00 2571-99 P co CCGG 55.340 -999.990 ... R5 2005 10 24 09 38 00 -46.4337 51.8478 202.00 197.00 5.00 207043 CRZ 2005 06 29 05 20 00 2572-99 P co CCGG 55.370 -999.990 ... R5 2005 10 24 09 52 00 -46.4337 51.8478 202.00 197.00 5.00 207044 CRZ 2005 07 04 11 27 00 3327-99 P co CCGG 57.070 -999.990 ... R5 2005 10 21 16 13 00 -46.4337 51.8478 202.00 197.00 5.00 207041 CRZ 2005 07 04 11 27 00 3328-99 P co CCGG 56.820 -999.990 ... R5 2005 10 21 16 28 00 -46.4337 51.8478 202.00 197.00 5.00 207042 CRZ 2005 07 11 05 29 00 1331-99 P co CCGG 57.350 -999.990 ... R5 2005 10 19 11 11 00 -46.4337 51.8478 202.00 197.00 5.00 207019 CRZ 2005 07 11 05 29 00 1332-99 P co CCGG 58.040 -999.990 ... R5 2005 10 19 11 26 00 -46.4337 51.8478 202.00 197.00 5.00 207020 CRZ 2005 07 19 06 05 00 6899-66 P co CCGG 61.290 -999.990 ... R5 2005 10 21 15 45 00 -46.4337 51.8478 202.00 197.00 5.00 207039 CRZ 2005 07 19 06 05 00 6900-66 P co CCGG 60.800 -999.990 ... R5 2005 10 21 15 59 00 -46.4337 51.8478 202.00 197.00 5.00 207040 CRZ 2005 08 01 05 54 00 509-99 P co CCGG 59.900 -999.990 ... R5 2005 10 19 11 40 00 -46.4337 51.8478 202.00 197.00 5.00 207021 CRZ 2005 08 01 05 54 00 510-99 P co CCGG 59.290 -999.990 ... R5 2005 10 19 11 54 00 -46.4337 51.8478 202.00 197.00 5.00 207022 CRZ 2005 08 06 11 03 00 3365-99 P co CCGG 62.240 -999.990 ... R5 2005 10 19 10 43 00 -46.4337 51.8478 202.00 197.00 5.00 207017 CRZ 2005 08 06 11 03 00 3366-99 P co CCGG 61.730 -999.990 ... R5 2005 10 19 10 57 00 -46.4337 51.8478 202.00 197.00 5.00 207018 CRZ 2005 08 11 12 59 00 2435-99 P co CCGG 61.700 -999.990 ... R5 2005 12 12 10 15 00 -46.4337 51.8478 202.00 197.00 5.00 210054 CRZ 2005 08 11 12 59 00 2436-99 P co CCGG 61.110 -999.990 ... R5 2005 12 12 10 29 00 -46.4337 51.8478 202.00 197.00 5.00 210055 CRZ 2005 08 16 11 27 00 2815-99 P co CCGG 61.080 -999.990 ... R5 2005 12 12 13 34 00 -46.4337 51.8478 202.00 197.00 5.00 210062 CRZ 2005 08 16 11 27 00 2816-99 P co CCGG 61.040 -999.990 ... R5 2005 12 12 13 48 00 -46.4337 51.8478 202.00 197.00 5.00 210063 CRZ 2005 08 22 11 33 00 2317-99 P co CCGG 61.490 -999.990 ... R5 2005 12 12 09 46 00 -46.4337 51.8478 202.00 197.00 5.00 210052 CRZ 2005 08 22 11 33 00 2318-99 P co CCGG 61.190 -999.990 ... R5 2005 12 12 10 00 00 -46.4337 51.8478 202.00 197.00 5.00 210053 CRZ 2005 08 31 12 09 00 291-99 P co CCGG 63.610 -999.990 ... R5 2005 12 12 13 06 00 -46.4337 51.8478 202.00 197.00 5.00 210060 CRZ 2005 08 31 12 09 00 292-99 P co CCGG 63.490 -999.990 ... R5 2005 12 12 13 20 00 -46.4337 51.8478 202.00 197.00 5.00 210061 CRZ 2005 09 07 05 34 00 2793-99 P co CCGG 64.530 -999.990 ... R5 2005 12 09 15 59 00 -46.4337 51.8478 202.00 197.00 5.00 210050 CRZ 2005 09 07 05 34 00 2794-99 P co CCGG 63.270 -999.990 ... R5 2005 12 09 16 13 00 -46.4337 51.8478 202.00 197.00 5.00 210051 CRZ 2005 09 14 06 58 00 1195-99 P co CCGG 63.670 -999.990 ... R5 2005 12 12 12 37 00 -46.4337 51.8478 202.00 197.00 5.00 210058 CRZ 2005 09 14 06 58 00 1196-99 P co CCGG 64.010 -999.990 ... R5 2005 12 12 12 51 00 -46.4337 51.8478 202.00 197.00 5.00 210059 CRZ 2005 09 21 07 14 00 513-99 P co CCGG 72.050 -999.990 ... R5 2005 12 09 15 31 00 -46.4337 51.8478 202.00 197.00 5.00 210048 CRZ 2005 09 21 07 14 00 514-99 P co CCGG 72.200 -999.990 ... R5 2005 12 09 15 45 00 -46.4337 51.8478 202.00 197.00 5.00 210049 CRZ 2005 10 01 04 01 00 2937-99 P co CCGG 67.210 -999.990 ... R5 2005 12 12 12 09 00 -46.4337 51.8478 202.00 197.00 5.00 210056 CRZ 2005 10 01 04 01 00 2938-99 P co CCGG 67.410 -999.990 ... R5 2005 12 12 12 23 00 -46.4337 51.8478 202.00 197.00 5.00 210057 CRZ 2005 10 04 05 41 00 3245-99 P co CCGG 82.850 -999.990 .X. R5 2006 01 20 10 50 00 -46.4337 51.8478 202.00 197.00 5.00 211517 CRZ 2005 10 04 05 41 00 3246-99 P co CCGG 80.890 -999.990 .X. R5 2006 01 20 11 04 00 -46.4337 51.8478 202.00 197.00 5.00 211518 CRZ 2005 10 14 05 25 00 3951-99 P co CCGG 70.810 -999.990 ... R5 2006 01 20 09 25 00 -46.4337 51.8478 202.00 197.00 5.00 211515 CRZ 2005 10 14 05 25 00 3952-99 P co CCGG 70.080 -999.990 ... R5 2006 01 20 09 39 00 -46.4337 51.8478 202.00 197.00 5.00 211516 CRZ 2005 10 17 07 15 00 2227-99 P co CCGG 77.800 -999.990 .X. R5 2006 01 20 13 41 00 -46.4337 51.8478 202.00 197.00 5.00 211513 CRZ 2005 10 17 07 15 00 2228-99 P co CCGG 77.180 -999.990 .X. R5 2006 01 20 13 56 00 -46.4337 51.8478 202.00 197.00 5.00 211514 CRZ 2005 10 24 04 39 00 3535-99 P co CCGG 71.850 -999.990 ... R5 2006 01 20 13 13 00 -46.4337 51.8478 202.00 197.00 5.00 211511 CRZ 2005 10 24 04 39 00 3536-99 P co CCGG 71.570 -999.990 ... R5 2006 01 20 13 27 00 -46.4337 51.8478 202.00 197.00 5.00 211512 CRZ 2005 11 04 05 25 00 2189-99 P co CCGG 66.020 -999.990 ... R5 2006 01 20 12 44 00 -46.4337 51.8478 202.00 197.00 5.00 211509 CRZ 2005 11 04 05 25 00 2190-99 P co CCGG 65.560 -999.990 ... R5 2006 01 20 12 59 00 -46.4337 51.8478 202.00 197.00 5.00 211510 CRZ 2005 11 07 02 07 00 3591-99 P co CCGG 65.730 -999.990 ... R5 2006 01 20 12 16 00 -46.4337 51.8478 202.00 197.00 5.00 211507 CRZ 2005 11 07 02 07 00 3592-99 P co CCGG 65.800 -999.990 ... R5 2006 01 20 12 30 00 -46.4337 51.8478 202.00 197.00 5.00 211508 CRZ 2005 11 14 06 35 00 2369-99 P co CCGG 70.170 -999.990 ... R5 2006 01 12 11 15 00 -46.4337 51.8478 202.00 197.00 5.00 211525 CRZ 2005 11 14 06 35 00 2370-99 P co CCGG 70.410 -999.990 ... R5 2006 01 12 11 29 00 -46.4337 51.8478 202.00 197.00 5.00 211526 CRZ 2005 11 20 06 05 00 6129-66 P co CCGG 65.420 -999.990 ... R5 2006 01 12 11 43 00 -46.4337 51.8478 202.00 197.00 5.00 211523 CRZ 2005 11 20 06 05 00 6130-66 P co CCGG 65.560 -999.990 ... R5 2006 01 12 11 57 00 -46.4337 51.8478 202.00 197.00 5.00 211524 CRZ 2005 11 28 05 27 00 1201-99 P co CCGG 47.900 -999.990 A.. R5 2006 06 22 13 12 00 -46.4337 51.8478 202.00 197.00 5.00 218015 CRZ 2005 11 28 05 27 00 1202-99 P co CCGG 46.620 -999.990 A.. R5 2006 06 22 13 26 00 -46.4337 51.8478 202.00 197.00 5.00 218016 CRZ 2005 12 07 04 34 00 2789-99 P co CCGG 40.530 -999.990 A.. R5 2006 06 22 11 47 00 -46.4337 51.8478 202.00 197.00 5.00 218017 CRZ 2005 12 07 04 34 00 2790-99 P co CCGG 39.640 -999.990 A.. R5 2006 06 22 12 01 00 -46.4337 51.8478 202.00 197.00 5.00 218018 CRZ 2005 12 14 06 03 00 6421-66 P co CCGG 37.780 -999.990 A.. R5 2006 06 22 12 44 00 -46.4337 51.8478 202.00 197.00 5.00 218013 CRZ 2005 12 14 06 03 00 6422-66 P co CCGG 36.210 -999.990 A.. R5 2006 06 22 12 58 00 -46.4337 51.8478 202.00 197.00 5.00 218014 CRZ 2005 12 19 05 00 00 3393-99 P co CCGG 35.780 -999.990 A.. R5 2006 06 22 12 15 00 -46.4337 51.8478 202.00 197.00 5.00 218011 CRZ 2005 12 19 05 00 00 3394-99 P co CCGG 35.880 -999.990 A.. R5 2006 06 22 12 29 00 -46.4337 51.8478 202.00 197.00 5.00 218012 CRZ 2005 12 26 05 37 00 117-99 P co CCGG 51.570 -999.990 ... R5 2006 06 23 10 53 00 -46.4337 51.8478 202.00 197.00 5.00 218007 CRZ 2005 12 26 05 37 00 118-99 P co CCGG 51.940 -999.990 ... R5 2006 06 23 11 07 00 -46.4337 51.8478 202.00 197.00 5.00 218008 CRZ 2006 01 02 04 54 00 4049-99 P co CCGG 51.650 -999.990 ... R5 2006 06 23 10 24 00 -46.4337 51.8478 202.00 197.00 5.00 218005 CRZ 2006 01 02 04 54 00 4050-99 P co CCGG 51.520 -999.990 ... R5 2006 06 23 10 39 00 -46.4337 51.8478 202.00 197.00 5.00 218006 CRZ 2006 01 10 06 38 00 1315-99 P co CCGG 30.070 -999.990 A.. R5 2006 06 22 15 35 00 -46.4337 51.8478 202.00 197.00 5.00 218003 CRZ 2006 01 10 06 38 00 1316-99 P co CCGG 28.850 -999.990 A.. R5 2006 06 22 15 50 00 -46.4337 51.8478 202.00 197.00 5.00 218004 CRZ 2006 01 16 05 00 00 2293-99 P co CCGG 30.780 -999.990 A.. R5 2006 06 22 16 04 00 -46.4337 51.8478 202.00 197.00 5.00 218009 CRZ 2006 01 16 05 00 00 2294-99 P co CCGG 27.160 -999.990 A.. R5 2006 06 22 16 18 00 -46.4337 51.8478 202.00 197.00 5.00 218010 CRZ 2006 01 24 05 26 00 2849-99 P co CCGG 46.130 -999.990 ... R5 2006 06 20 11 19 00 -46.4337 51.8478 202.00 197.00 5.00 218032 CRZ 2006 01 24 05 26 00 2850-99 P co CCGG 46.320 -999.990 ... R5 2006 06 20 11 33 00 -46.4337 51.8478 202.00 197.00 5.00 218033 CRZ 2006 01 31 06 25 00 1647-99 P co CCGG 45.060 -999.990 ... R5 2006 06 20 10 22 00 -46.4337 51.8478 202.00 197.00 5.00 218028 CRZ 2006 01 31 06 25 00 1648-99 P co CCGG 45.010 -999.990 ... R5 2006 06 20 10 36 00 -46.4337 51.8478 202.00 197.00 5.00 218029 CRZ 2006 02 07 06 28 00 1613-99 P co CCGG 44.760 -999.990 ... R5 2006 06 20 10 51 00 -46.4337 51.8478 202.00 197.00 5.00 218030 CRZ 2006 02 07 06 28 00 1614-99 P co CCGG 44.670 -999.990 ... R5 2006 06 20 11 05 00 -46.4337 51.8478 202.00 197.00 5.00 218031 CRZ 2006 02 13 06 10 00 913-99 P co CCGG 46.010 -999.990 ... R5 2006 06 21 11 17 00 -46.4337 51.8478 202.00 197.00 5.00 218024 CRZ 2006 02 13 06 10 00 914-99 P co CCGG 45.750 -999.990 ... R5 2006 06 21 11 31 00 -46.4337 51.8478 202.00 197.00 5.00 218025 CRZ 2006 02 22 05 51 00 1731-99 P co CCGG 48.570 -999.990 A.. R5 2006 06 20 09 54 00 -46.4337 51.8478 202.00 197.00 5.00 218026 CRZ 2006 02 22 05 51 00 1732-99 P co CCGG 43.320 -999.990 ... R5 2006 06 20 10 08 00 -46.4337 51.8478 202.00 197.00 5.00 218027 CRZ 2006 02 27 11 45 00 6051-66 P co CCGG 47.470 -999.990 ... R5 2006 06 21 10 49 00 -46.4337 51.8478 202.00 197.00 5.00 218021 CRZ 2006 02 27 11 45 00 6052-66 P co CCGG 47.770 -999.990 ... R5 2006 06 21 11 03 00 -46.4337 51.8478 202.00 197.00 5.00 218022 CRZ 2006 03 08 11 06 00 1189-99 P co CCGG 44.890 -999.990 ... R5 2006 06 21 09 55 00 -46.4337 51.8478 202.00 197.00 5.00 218019 CRZ 2006 03 08 11 06 00 1190-99 P co CCGG 44.990 -999.990 ... R5 2006 06 21 10 09 00 -46.4337 51.8478 202.00 197.00 5.00 218020 CRZ 2006 03 16 06 55 00 562-99 P co CCGG 45.240 -999.990 ... R5 2006 06 21 11 46 00 -46.4337 51.8478 202.00 197.00 5.00 218023 CRZ 2006 03 21 05 20 00 1659-99 P co CCGG 43.670 -999.990 ... R5 2006 10 24 13 29 00 -46.4337 51.8478 202.00 197.00 5.00 223856 CRZ 2006 03 21 05 20 00 1660-99 P co CCGG 43.520 -999.990 ... R5 2006 10 24 13 43 00 -46.4337 51.8478 202.00 197.00 5.00 223857 CRZ 2006 03 29 04 55 00 2863-99 P co CCGG 44.420 -999.990 ... R5 2006 10 24 09 13 00 -46.4337 51.8478 202.00 197.00 5.00 223849 CRZ 2006 03 29 04 55 00 2864-99 P co CCGG 44.460 -999.990 ... R5 2006 10 24 09 27 00 -46.4337 51.8478 202.00 197.00 5.00 223850 CRZ 2006 04 03 04 12 00 553-99 P co CCGG 45.020 -999.990 ... R5 2006 10 24 12 32 00 -46.4337 51.8478 202.00 197.00 5.00 223854 CRZ 2006 04 03 04 12 00 554-99 P co CCGG 43.870 -999.990 ... R5 2006 10 24 12 46 00 -46.4337 51.8478 202.00 197.00 5.00 223855 CRZ 2006 04 10 04 47 00 3759-99 P co CCGG 45.140 -999.990 ... R5 2006 10 24 08 44 00 -46.4337 51.8478 202.00 197.00 5.00 223847 CRZ 2006 04 10 04 47 00 3760-99 P co CCGG 45.220 -999.990 ... R5 2006 10 24 08 58 00 -46.4337 51.8478 202.00 197.00 5.00 223848 CRZ 2006 04 17 06 01 00 2701-99 P co CCGG 45.120 -999.990 ... R5 2006 10 24 13 00 00 -46.4337 51.8478 202.00 197.00 5.00 223852 CRZ 2006 04 17 06 01 00 2702-99 P co CCGG 44.780 -999.990 ... R5 2006 10 24 13 15 00 -46.4337 51.8478 202.00 197.00 5.00 223853 CRZ 2006 04 24 06 07 00 1769-99 P co CCGG 46.490 -999.990 ... R5 2006 10 24 12 03 00 -46.4337 51.8478 202.00 197.00 5.00 223845 CRZ 2006 05 01 05 26 00 2450-99 P co CCGG 46.570 -999.990 ... R5 2006 10 24 12 18 00 -46.4337 51.8478 202.00 197.00 5.00 223851 CRZ 2006 05 11 11 22 00 1785-99 P co CCGG 49.350 -999.990 ... R5 2006 10 23 14 54 00 -46.4337 51.8478 202.00 197.00 5.00 223843 CRZ 2006 05 11 11 22 00 1786-99 P co CCGG 49.080 -999.990 ... R5 2006 10 23 15 08 00 -46.4337 51.8478 202.00 197.00 5.00 223844 CRZ 2006 05 17 10 36 00 4537-99 P co CCGG 48.210 -999.990 ... R5 2006 10 25 15 04 00 -46.4337 51.8478 202.00 197.00 5.00 223858 CRZ 2006 05 23 04 49 00 4527-99 P co CCGG 52.750 -999.990 ... R5 2006 10 24 11 35 00 -46.4337 51.8478 202.00 197.00 5.00 223871 CRZ 2006 05 23 04 49 00 4528-99 P co CCGG 53.020 -999.990 ... R5 2006 10 24 11 49 00 -46.4337 51.8478 202.00 197.00 5.00 223872 CRZ 2006 05 29 05 27 00 4535-99 P co CCGG 48.670 -999.990 ... R5 2006 10 24 11 06 00 -46.4337 51.8478 202.00 197.00 5.00 223869 CRZ 2006 05 29 05 27 00 4536-99 P co CCGG 48.400 -999.990 ... R5 2006 10 24 11 21 00 -46.4337 51.8478 202.00 197.00 5.00 223870 CRZ 2006 06 06 05 38 00 975-99 P co CCGG 49.480 -999.990 ... R5 2006 10 25 14 22 00 -46.4337 51.8478 202.00 197.00 5.00 223863 CRZ 2006 06 06 05 38 00 976-99 P co CCGG 49.280 -999.990 ... R5 2006 10 25 14 36 00 -46.4337 51.8478 202.00 197.00 5.00 223864 CRZ 2006 06 13 05 17 00 3499-99 P co CCGG 50.380 -999.990 ... R5 2006 10 24 10 38 00 -46.4337 51.8478 202.00 197.00 5.00 223867 CRZ 2006 06 13 05 17 00 3500-99 P co CCGG 50.190 -999.990 ... R5 2006 10 24 10 52 00 -46.4337 51.8478 202.00 197.00 5.00 223868 CRZ 2006 06 21 05 39 00 3871-99 P co CCGG 57.180 -999.990 ... R5 2006 10 25 13 53 00 -46.4337 51.8478 202.00 197.00 5.00 223861 CRZ 2006 06 21 05 39 00 3872-99 P co CCGG 57.630 -999.990 ... R5 2006 10 25 14 08 00 -46.4337 51.8478 202.00 197.00 5.00 223862 CRZ 2006 06 27 04 48 00 3645-99 P co CCGG 52.280 -999.990 ... R5 2006 10 24 10 10 00 -46.4337 51.8478 202.00 197.00 5.00 223865 CRZ 2006 06 27 04 48 00 3646-99 P co CCGG 52.140 -999.990 ... R5 2006 10 24 10 24 00 -46.4337 51.8478 202.00 197.00 5.00 223866 CRZ 2006 07 03 04 32 00 2143-99 P co CCGG 54.000 -999.990 ... R5 2006 10 25 13 25 00 -46.4337 51.8478 202.00 197.00 5.00 223859 CRZ 2006 07 03 04 32 00 2144-99 P co CCGG 54.000 -999.990 ... R5 2006 10 25 13 39 00 -46.4337 51.8478 202.00 197.00 5.00 223860 CRZ 2006 07 10 05 14 00 987-99 P co CCGG 52.610 -999.990 ... R5 2007 02 05 11 28 00 -46.4337 51.8478 202.00 197.00 5.00 228210 CRZ 2006 07 10 05 14 00 988-99 P co CCGG 52.460 -999.990 ... R5 2007 02 05 11 43 00 -46.4337 51.8478 202.00 197.00 5.00 228211 CRZ 2006 07 19 04 55 00 4529-99 P co CCGG 54.190 -999.990 ... R5 2007 02 05 11 00 00 -46.4337 51.8478 202.00 197.00 5.00 228208 CRZ 2006 07 19 04 55 00 4530-99 P co CCGG 54.500 -999.990 P.. R5 2007 02 05 11 14 00 -46.4337 51.8478 202.00 197.00 5.00 228209 CRZ 2006 07 26 10 55 00 721-99 P co CCGG 57.760 -999.990 P.. R5 2007 02 05 10 31 00 -46.4337 51.8478 202.00 197.00 5.00 228206 CRZ 2006 07 26 10 55 00 722-99 P co CCGG 56.810 -999.990 ... R5 2007 02 05 10 46 00 -46.4337 51.8478 202.00 197.00 5.00 228207 CRZ 2006 08 10 04 50 00 1250-99 P co CCGG 57.710 -999.990 ... R5 2007 02 07 11 42 00 -46.4337 51.8478 202.00 197.00 5.00 228201 CRZ 2006 08 14 04 08 00 737-99 P co CCGG 57.240 -999.990 ... R5 2007 02 05 10 03 00 -46.4337 51.8478 202.00 197.00 5.00 228204 CRZ 2006 08 14 04 08 00 738-99 P co CCGG 57.920 -999.990 ... R5 2007 02 05 10 17 00 -46.4337 51.8478 202.00 197.00 5.00 228205 CRZ 2006 08 22 04 54 00 2859-99 P co CCGG 60.920 -999.990 ... R5 2007 02 06 14 01 00 -46.4337 51.8478 202.00 197.00 5.00 228202 CRZ 2006 08 22 04 54 00 2860-99 P co CCGG 60.080 -999.990 ... R5 2007 02 06 14 16 00 -46.4337 51.8478 202.00 197.00 5.00 228203 CRZ 2006 08 29 05 47 00 1171-99 P co CCGG 59.540 -999.990 ... R5 2007 02 03 11 38 00 -46.4337 51.8478 202.00 197.00 5.00 228226 CRZ 2006 08 29 05 47 00 1172-99 P co CCGG 59.630 -999.990 ... R5 2007 02 03 11 52 00 -46.4337 51.8478 202.00 197.00 5.00 228227 CRZ 2006 09 04 05 26 00 849-99 P co CCGG 60.510 -999.990 ... R5 2007 02 03 11 10 00 -46.4337 51.8478 202.00 197.00 5.00 228224 CRZ 2006 09 04 05 26 00 850-99 P co CCGG 63.150 -999.990 ... R5 2007 02 03 11 24 00 -46.4337 51.8478 202.00 197.00 5.00 228225 CRZ 2006 09 12 05 43 00 1257-99 P co CCGG 62.470 -999.990 ... R5 2007 02 02 15 50 00 -46.4337 51.8478 202.00 197.00 5.00 228220 CRZ 2006 09 12 05 43 00 1258-99 P co CCGG 61.770 -999.990 ... R5 2007 02 02 16 04 00 -46.4337 51.8478 202.00 197.00 5.00 228221 CRZ 2006 09 19 11 41 00 1591-99 P co CCGG 60.750 -999.990 ... R5 2007 02 02 16 18 00 -46.4337 51.8478 202.00 197.00 5.00 228222 CRZ 2006 09 19 11 41 00 1592-99 P co CCGG 60.380 -999.990 ... R5 2007 02 02 16 32 00 -46.4337 51.8478 202.00 197.00 5.00 228223 CRZ 2006 09 26 11 29 00 6367-66 P co CCGG 60.380 -999.990 ... R5 2007 02 07 14 33 00 -46.4337 51.8478 202.00 197.00 5.00 228214 CRZ 2006 09 26 11 29 00 6368-66 P co CCGG 60.520 -999.990 ... R5 2007 02 07 14 47 00 -46.4337 51.8478 202.00 197.00 5.00 228215 CRZ 2006 10 05 05 13 00 2999-99 P co CCGG -999.990 -999.990 I.. R5 2007 02 07 15 30 00 -46.4337 51.8478 202.00 197.00 5.00 228218 CRZ 2006 10 05 05 13 00 3000-99 P co CCGG 64.840 -999.990 ... R5 2007 02 07 15 44 00 -46.4337 51.8478 202.00 197.00 5.00 228219 CRZ 2006 10 09 04 44 00 3549-99 P co CCGG 61.600 -999.990 ... R5 2007 02 07 14 05 00 -46.4337 51.8478 202.00 197.00 5.00 228212 CRZ 2006 10 09 04 44 00 3550-99 P co CCGG 60.660 -999.990 ... R5 2007 02 07 14 19 00 -46.4337 51.8478 202.00 197.00 5.00 228213 CRZ 2006 10 20 07 45 00 79-99 P co CCGG 66.560 -999.990 ... R5 2007 02 07 15 01 00 -46.4337 51.8478 202.00 197.00 5.00 228216 CRZ 2006 10 20 07 45 00 80-99 P co CCGG 65.340 -999.990 ... R5 2007 02 07 15 16 00 -46.4337 51.8478 202.00 197.00 5.00 228217 CRZ 2006 10 27 05 06 00 3751-99 P co CCGG 63.220 -999.990 ... R5 2007 02 06 15 55 00 -46.4337 51.8478 202.00 197.00 5.00 228242 CRZ 2006 10 27 05 06 00 3752-99 P co CCGG 62.880 -999.990 ... R5 2007 02 06 16 10 00 -46.4337 51.8478 202.00 197.00 5.00 228243 CRZ 2006 11 02 12 55 00 3721-99 P co CCGG 59.410 -999.990 ... R5 2007 02 06 14 30 00 -46.4337 51.8478 202.00 197.00 5.00 228236 CRZ 2006 11 02 12 55 00 3722-99 P co CCGG 59.800 -999.990 ... R5 2007 02 06 14 44 00 -46.4337 51.8478 202.00 197.00 5.00 228237 CRZ 2006 11 08 05 09 00 3681-99 P co CCGG 61.320 -999.990 ... R5 2007 02 06 15 27 00 -46.4337 51.8478 202.00 197.00 5.00 228240 CRZ 2006 11 08 05 09 00 3682-99 P co CCGG 61.610 -999.990 ... R5 2007 02 06 15 41 00 -46.4337 51.8478 202.00 197.00 5.00 228241 CRZ 2006 11 13 05 29 00 1463-99 P co CCGG 56.490 -999.990 ... R5 2007 02 07 09 48 00 -46.4337 51.8478 202.00 197.00 5.00 228234 CRZ 2006 11 13 05 29 00 1464-99 P co CCGG 55.920 -999.990 ... R5 2007 02 07 10 02 00 -46.4337 51.8478 202.00 197.00 5.00 228235 CRZ 2006 11 20 05 48 00 4351-99 P co CCGG 58.380 -999.990 ... R5 2007 02 06 14 58 00 -46.4337 51.8478 202.00 197.00 5.00 228238 CRZ 2006 11 20 05 48 00 4352-99 P co CCGG 58.370 -999.990 ... R5 2007 02 06 15 13 00 -46.4337 51.8478 202.00 197.00 5.00 228239 CRZ 2006 11 27 06 41 00 529-99 P co CCGG 53.860 -999.990 ... R5 2007 02 07 09 20 00 -46.4337 51.8478 202.00 197.00 5.00 228232 CRZ 2006 11 27 06 41 00 530-99 P co CCGG 53.930 -999.990 ... R5 2007 02 07 09 34 00 -46.4337 51.8478 202.00 197.00 5.00 228233 CRZ 2006 12 10 06 56 00 3863-99 P co CCGG 53.350 -999.990 ... R6 2007 05 18 15 24 00 -46.4337 51.8478 202.00 197.00 5.00 234133 CRZ 2006 12 10 06 56 00 3864-99 P co CCGG 53.490 -999.990 ... R6 2007 05 18 15 39 00 -46.4337 51.8478 202.00 197.00 5.00 234134 CRZ 2006 12 15 08 39 00 3343-99 P co CCGG 59.640 -999.990 ... R6 2007 05 18 13 28 00 -46.4337 51.8478 202.00 197.00 5.00 234131 CRZ 2006 12 15 08 39 00 3344-99 P co CCGG 58.890 -999.990 ... R6 2007 05 18 13 43 00 -46.4337 51.8478 202.00 197.00 5.00 234132 CRZ 2006 12 23 13 19 00 4583-99 P co CCGG 52.890 -999.990 ... R6 2007 05 18 13 57 00 -46.4337 51.8478 202.00 197.00 5.00 234129 CRZ 2006 12 23 13 19 00 4584-99 P co CCGG 52.810 -999.990 ... R6 2007 05 18 14 12 00 -46.4337 51.8478 202.00 197.00 5.00 234130 CRZ 2006 12 29 05 45 00 1085-99 P co CCGG 47.070 -999.990 ... R6 2007 05 18 12 59 00 -46.4337 51.8478 202.00 197.00 5.00 234127 CRZ 2006 12 29 05 45 00 1086-99 P co CCGG 48.470 -999.990 ... R6 2007 05 18 13 14 00 -46.4337 51.8478 202.00 197.00 5.00 234128 CRZ 2007 01 11 11 21 00 3737-99 P co CCGG 51.820 -999.990 ... R5 2007 05 18 12 04 00 -46.4337 51.8478 202.00 197.00 5.00 234123 CRZ 2007 01 11 11 21 00 3738-99 P co CCGG 51.110 -999.990 ... R5 2007 05 18 12 18 00 -46.4337 51.8478 202.00 197.00 5.00 234124 CRZ 2007 01 18 05 42 00 4119-99 P co CCGG 44.580 -999.990 ... R5 2007 05 18 11 35 00 -46.4337 51.8478 202.00 197.00 5.00 234125 CRZ 2007 01 18 05 42 00 4120-99 P co CCGG 44.690 -999.990 ... R5 2007 05 18 11 50 00 -46.4337 51.8478 202.00 197.00 5.00 234126 CRZ 2007 01 22 10 14 00 2336-99 P co CCGG 51.060 -999.990 ... R5 2007 05 25 11 42 00 -46.4337 51.8478 202.00 197.00 5.00 234122 CRZ 2007 01 31 06 53 00 3953-99 P co CCGG 45.830 -999.990 ... R5 2007 05 18 11 07 00 -46.4337 51.8478 202.00 197.00 5.00 234119 CRZ 2007 01 31 06 53 00 3954-99 P co CCGG 45.560 -999.990 ... R5 2007 05 18 11 21 00 -46.4337 51.8478 202.00 197.00 5.00 234120 CRZ 2007 02 05 12 02 00 365-99 P co CCGG 45.240 -999.990 ... R5 2007 05 17 16 38 00 -46.4337 51.8478 202.00 197.00 5.00 234117 CRZ 2007 02 05 12 02 00 366-99 P co CCGG 45.910 -999.990 ... R5 2007 05 17 16 52 00 -46.4337 51.8478 202.00 197.00 5.00 234118 CRZ 2007 02 17 12 10 00 2637-99 P co CCGG 43.610 -999.990 ... R5 2007 05 17 15 41 00 -46.4337 51.8478 202.00 197.00 5.00 234113 CRZ 2007 02 17 12 10 00 2638-99 P co CCGG 43.450 -999.990 ... R5 2007 05 17 15 56 00 -46.4337 51.8478 202.00 197.00 5.00 234114 CRZ 2007 02 21 09 04 00 3111-99 P co CCGG 48.000 -999.990 ... R5 2007 05 17 16 10 00 -46.4337 51.8478 202.00 197.00 5.00 234115 CRZ 2007 02 21 09 04 00 3112-99 P co CCGG 47.270 -999.990 ... R5 2007 05 17 16 24 00 -46.4337 51.8478 202.00 197.00 5.00 234116 CRZ 2007 03 01 12 12 00 2511-99 P co CCGG 44.100 -999.990 ... R5 2007 05 17 15 13 00 -46.4337 51.8478 202.00 197.00 5.00 234111 CRZ 2007 03 01 12 12 00 2512-99 P co CCGG 43.710 -999.990 ... R5 2007 05 17 15 27 00 -46.4337 51.8478 202.00 197.00 5.00 234112 CRZ 2007 03 05 12 41 00 131-99 P co CCGG 42.970 -999.990 ... R5 2007 05 18 13 58 00 -46.4337 51.8478 202.00 197.00 5.00 234109 CRZ 2007 03 05 12 41 00 132-99 P co CCGG 42.990 -999.990 ... R5 2007 05 18 14 12 00 -46.4337 51.8478 202.00 197.00 5.00 234110 CRZ 2007 03 14 04 54 00 873-99 P co CCGG 43.170 -999.990 ... R5 2007 05 18 13 29 00 -46.4337 51.8478 202.00 197.00 5.00 234107 CRZ 2007 03 14 04 54 00 874-99 P co CCGG 43.280 -999.990 ... R5 2007 05 18 13 43 00 -46.4337 51.8478 202.00 197.00 5.00 234108 CRZ 2007 03 19 03 01 00 1485-99 P co CCGG 42.160 -999.990 ..C R5 2007 05 18 13 01 00 -46.4337 51.8478 202.00 197.00 5.00 234105 CRZ 2007 03 19 03 01 00 1486-99 P co CCGG 41.820 -999.990 ..C R5 2007 05 18 13 15 00 -46.4337 51.8478 202.00 197.00 5.00 234106 CRZ 2007 03 26 03 49 00 2249-99 P co CCGG 45.440 -999.990 ... R5 2007 10 01 11 11 00 -46.4337 51.8478 202.00 197.00 5.00 242491 CRZ 2007 03 26 03 49 00 2250-99 P co CCGG 45.830 -999.990 ... R5 2007 10 01 11 25 00 -46.4337 51.8478 202.00 197.00 5.00 242492 CRZ 2007 04 02 04 56 00 1079-99 P co CCGG 47.040 -999.990 ... R5 2007 10 01 11 39 00 -46.4337 51.8478 202.00 197.00 5.00 242489 CRZ 2007 04 02 04 56 00 1080-99 P co CCGG 47.590 -999.990 ... R5 2007 10 01 11 53 00 -46.4337 51.8478 202.00 197.00 5.00 242490 CRZ 2007 04 13 05 14 00 675-99 P co CCGG 47.990 -999.990 ... R5 2007 10 01 10 42 00 -46.4337 51.8478 202.00 197.00 5.00 242473 CRZ 2007 04 13 05 14 00 676-99 P co CCGG 48.460 -999.990 ... R5 2007 10 01 10 57 00 -46.4337 51.8478 202.00 197.00 5.00 242474 CRZ 2007 04 18 09 44 00 1967-99 P co CCGG 48.190 -999.990 ... R5 2007 10 01 12 08 00 -46.4337 51.8478 202.00 197.00 5.00 242487 CRZ 2007 04 18 09 44 00 1968-99 P co CCGG 48.080 -999.990 ... R5 2007 10 01 12 22 00 -46.4337 51.8478 202.00 197.00 5.00 242488 CRZ 2007 04 23 05 01 00 1001-99 P co CCGG 50.010 -999.990 ... R5 2007 10 01 10 14 00 -46.4337 51.8478 202.00 197.00 5.00 242475 CRZ 2007 04 23 05 01 00 1002-99 P co CCGG 49.750 -999.990 ... R5 2007 10 01 10 28 00 -46.4337 51.8478 202.00 197.00 5.00 242476 CRZ 2007 05 01 06 04 00 3119-99 P co CCGG 48.450 -999.990 ... R5 2007 10 01 09 45 00 -46.4337 51.8478 202.00 197.00 5.00 242485 CRZ 2007 05 01 06 04 00 3120-99 P co CCGG 48.140 -999.990 ... R5 2007 10 01 10 00 00 -46.4337 51.8478 202.00 197.00 5.00 242486 CRZ 2007 05 16 05 16 00 2805-99 P co CCGG 51.300 -999.990 ... R5 2007 09 28 14 27 00 -46.4337 51.8478 202.00 197.00 5.00 242469 CRZ 2007 05 16 05 16 00 2806-99 P co CCGG 51.140 -999.990 ... R5 2007 09 28 14 41 00 -46.4337 51.8478 202.00 197.00 5.00 242470 CRZ 2007 05 25 04 43 00 727-99 P co CCGG 51.780 -999.990 ... R5 2007 09 28 14 55 00 -46.4337 51.8478 202.00 197.00 5.00 242471 CRZ 2007 05 25 04 43 00 728-99 P co CCGG 52.180 -999.990 ... R5 2007 09 28 15 10 00 -46.4337 51.8478 202.00 197.00 5.00 242472 CRZ 2007 05 28 06 01 00 3305-99 P co CCGG 51.140 -999.990 ... R5 2007 09 28 12 33 00 -46.4337 51.8478 202.00 197.00 5.00 242550 CRZ 2007 05 28 06 01 00 3306-99 P co CCGG 51.450 -999.990 ... R5 2007 09 28 12 47 00 -46.4337 51.8478 202.00 197.00 5.00 242551 CRZ 2007 06 04 09 30 00 879-99 P co CCGG 55.610 -999.990 ... R5 2007 10 01 14 02 00 -46.4337 51.8478 202.00 197.00 5.00 242477 CRZ 2007 06 04 09 30 00 880-99 P co CCGG 55.460 -999.990 ... R5 2007 10 01 14 16 00 -46.4337 51.8478 202.00 197.00 5.00 242478 CRZ 2007 06 12 05 07 00 4323-99 P co CCGG 55.800 -999.990 ... R5 2007 10 01 13 33 00 -46.4337 51.8478 202.00 197.00 5.00 242481 CRZ 2007 06 12 05 07 00 4324-99 P co CCGG 56.030 -999.990 ... R5 2007 10 01 13 47 00 -46.4337 51.8478 202.00 197.00 5.00 242482 CRZ 2007 06 20 05 53 00 1615-99 P co CCGG 54.810 -999.990 ... R5 2007 10 01 12 36 00 -46.4337 51.8478 202.00 197.00 5.00 242479 CRZ 2007 06 20 05 53 00 1616-99 P co CCGG 54.200 -999.990 ... R5 2007 10 01 12 50 00 -46.4337 51.8478 202.00 197.00 5.00 242480 CRZ 2007 06 27 09 49 00 3999-99 P co CCGG 55.220 -999.990 ... R5 2007 10 01 13 05 00 -46.4337 51.8478 202.00 197.00 5.00 242483 CRZ 2007 06 27 09 49 00 4000-99 P co CCGG 55.350 -999.990 ... R5 2007 10 01 13 19 00 -46.4337 51.8478 202.00 197.00 5.00 242484 CRZ 2007 07 04 06 13 00 3313-99 P co CCGG 55.630 -999.990 ... R5 2007 12 13 11 27 00 -46.4337 51.8478 202.00 197.00 5.00 246232 CRZ 2007 07 04 06 13 00 3314-99 P co CCGG 55.840 -999.990 ... R5 2007 12 13 11 41 00 -46.4337 51.8478 202.00 197.00 5.00 246233 CRZ 2007 07 10 05 39 00 1643-99 P co CCGG 68.300 -999.990 .X. R5 2007 12 13 11 55 00 -46.4337 51.8478 202.00 197.00 5.00 246234 CRZ 2007 07 10 05 39 00 1644-99 P co CCGG 68.320 -999.990 .X. R5 2007 12 13 12 09 00 -46.4337 51.8478 202.00 197.00 5.00 246235 CRZ 2007 07 16 04 44 00 577-99 P co CCGG 58.350 -999.990 ... R5 2007 12 13 10 25 00 -46.4337 51.8478 202.00 197.00 5.00 246226 CRZ 2007 07 16 04 44 00 578-99 P co CCGG 57.770 -999.990 ... R5 2007 12 13 10 39 00 -46.4337 51.8478 202.00 197.00 5.00 246227 CRZ 2007 07 25 05 48 00 1525-99 P co CCGG 60.090 -999.990 ... R5 2007 12 28 09 07 00 -46.4337 51.8478 202.00 197.00 5.00 246222 CRZ 2007 07 25 05 48 00 1526-99 P co CCGG 59.660 -999.990 ... R5 2007 12 28 09 21 00 -46.4337 51.8478 202.00 197.00 5.00 246223 CRZ 2007 08 03 05 41 00 3625-99 P co CCGG 59.740 -999.990 ... R5 2007 12 28 09 35 00 -46.4337 51.8478 202.00 197.00 5.00 246224 CRZ 2007 08 03 05 41 00 3626-99 P co CCGG 60.140 -999.990 ... R5 2007 12 28 09 49 00 -46.4337 51.8478 202.00 197.00 5.00 246225 CRZ 2007 08 13 13 29 00 1228-99 P co CCGG 61.870 -999.990 ... R5 2007 12 13 10 10 00 -46.4337 51.8478 202.00 197.00 5.00 246228 CRZ 2007 08 22 04 59 00 2133-99 P co CCGG 64.360 -999.990 ... R5 2007 12 26 16 34 00 -46.4337 51.8478 202.00 197.00 5.00 246220 CRZ 2007 08 22 04 59 00 2134-99 P co CCGG 64.220 -999.990 ... R5 2007 12 26 16 48 00 -46.4337 51.8478 202.00 197.00 5.00 246221 CRZ 2007 08 31 11 05 00 2237-99 P co CCGG 63.840 -999.990 ... R5 2007 12 21 09 54 00 -46.4337 51.8478 202.00 197.00 5.00 246442 CRZ 2007 08 31 11 05 00 2238-99 P co CCGG 62.990 -999.990 ... R5 2007 12 21 10 09 00 -46.4337 51.8478 202.00 197.00 5.00 246443 CRZ 2007 09 10 03 57 00 4013-99 P co CCGG 73.830 -999.990 ... R5 2007 12 21 09 26 00 -46.4337 51.8478 202.00 197.00 5.00 246440 CRZ 2007 09 10 03 57 00 4014-99 P co CCGG 71.830 -999.990 ... R5 2007 12 21 09 40 00 -46.4337 51.8478 202.00 197.00 5.00 246441 CRZ 2007 09 18 04 50 00 2329-99 P co CCGG 64.610 -999.990 ... R5 2007 12 21 08 57 00 -46.4337 51.8478 202.00 197.00 5.00 246438 CRZ 2007 09 18 04 50 00 2330-99 P co CCGG 64.730 -999.990 ... R5 2007 12 21 09 12 00 -46.4337 51.8478 202.00 197.00 5.00 246439 CRZ 2007 09 29 13 21 00 3461-99 P co CCGG 73.500 -999.990 ... R5 2007 12 20 14 54 00 -46.4337 51.8478 202.00 197.00 5.00 246436 CRZ 2007 09 29 13 21 00 3462-99 P co CCGG 72.700 -999.990 ... R5 2007 12 20 15 08 00 -46.4337 51.8478 202.00 197.00 5.00 246437 CRZ 2007 10 11 10 20 00 181-99 P co CCGG 66.880 -999.990 ... R5 2007 12 18 14 39 00 -46.4337 51.8478 202.00 197.00 5.00 246434 CRZ 2007 10 11 10 20 00 182-99 P co CCGG 66.060 -999.990 ... R5 2007 12 18 14 54 00 -46.4337 51.8478 202.00 197.00 5.00 246435 CRZ 2007 10 20 05 08 00 4333-99 P co CCGG 67.200 -999.990 ... R5 2007 12 18 16 05 00 -46.4337 51.8478 202.00 197.00 5.00 246432 CRZ 2007 10 20 05 08 00 4334-99 P co CCGG 67.180 -999.990 ... R5 2007 12 18 16 19 00 -46.4337 51.8478 202.00 197.00 5.00 246433 CRZ 2007 10 28 03 48 00 4233-99 P co CCGG 65.430 -999.990 ... R5 2007 12 18 15 36 00 -46.4337 51.8478 202.00 197.00 5.00 246430 CRZ 2007 10 28 03 48 00 4234-99 P co CCGG 65.360 -999.990 ... R5 2007 12 18 15 51 00 -46.4337 51.8478 202.00 197.00 5.00 246431 CRZ 2007 11 05 03 57 00 269-99 P co CCGG 65.510 -999.990 ... R5 2007 12 18 15 08 00 -46.4337 51.8478 202.00 197.00 5.00 246428 CRZ 2007 11 05 03 57 00 270-99 P co CCGG 65.670 -999.990 ... R5 2007 12 18 15 22 00 -46.4337 51.8478 202.00 197.00 5.00 246429 CRZ 2007 11 13 09 17 00 13-99 P co CCGG 67.930 -999.990 ... R5 2008 05 21 11 56 00 -46.4337 51.8478 202.00 197.00 5.00 254443 CRZ 2007 11 13 09 17 00 14-99 P co CCGG 67.790 -999.990 ... R5 2008 05 21 12 10 00 -46.4337 51.8478 202.00 197.00 5.00 254444 CRZ 2007 11 19 13 42 00 519-99 P co CCGG 63.940 -999.990 ... R5 2008 05 21 12 24 00 -46.4337 51.8478 202.00 197.00 5.00 254445 CRZ 2007 11 19 13 42 00 520-99 P co CCGG 64.000 -999.990 ... R5 2008 05 21 12 38 00 -46.4337 51.8478 202.00 197.00 5.00 254446 CRZ 2007 11 28 07 09 00 867-99 P co CCGG 59.910 -999.990 ... R5 2008 05 21 10 59 00 -46.4337 51.8478 202.00 197.00 5.00 254439 CRZ 2007 11 28 07 09 00 868-99 P co CCGG 59.700 -999.990 ... R5 2008 05 21 11 13 00 -46.4337 51.8478 202.00 197.00 5.00 254440 CRZ 2007 12 03 06 55 00 699-99 P co CCGG 61.190 -999.990 ... R5 2008 05 21 11 27 00 -46.4337 51.8478 202.00 197.00 5.00 254441 CRZ 2007 12 03 06 55 00 700-99 P co CCGG 60.890 -999.990 ... R5 2008 05 21 11 41 00 -46.4337 51.8478 202.00 197.00 5.00 254442 CRZ 2007 12 12 05 49 00 1873-99 P co CCGG 56.330 -999.990 ... R5 2008 05 19 11 46 00 -46.4337 51.8478 202.00 197.00 5.00 254399 CRZ 2007 12 12 05 49 00 1874-99 P co CCGG 56.060 -999.990 ... R5 2008 05 19 12 01 00 -46.4337 51.8478 202.00 197.00 5.00 254400 CRZ 2007 12 18 13 07 00 1017-99 P co CCGG 54.770 -999.990 ... R5 2008 05 19 11 18 00 -46.4337 51.8478 202.00 197.00 5.00 254397 CRZ 2007 12 18 13 07 00 1018-99 P co CCGG 54.760 -999.990 ... R5 2008 05 19 11 32 00 -46.4337 51.8478 202.00 197.00 5.00 254398 CRZ 2007 12 26 14 13 00 2033-99 P co CCGG 52.710 -999.990 ... R5 2008 05 21 13 50 00 -46.4337 51.8478 202.00 197.00 5.00 254393 CRZ 2007 12 26 14 13 00 2034-99 P co CCGG 52.080 -999.990 ... R5 2008 05 21 14 04 00 -46.4337 51.8478 202.00 197.00 5.00 254394 CRZ 2008 01 01 11 10 00 1729-99 P co CCGG 52.510 -999.990 ... R5 2008 05 21 14 18 00 -46.4337 51.8478 202.00 197.00 5.00 254395 CRZ 2008 01 01 11 10 00 1730-99 P co CCGG 52.050 -999.990 ... R5 2008 05 21 14 32 00 -46.4337 51.8478 202.00 197.00 5.00 254396 CRZ 2008 01 10 14 07 00 405-99 P co CCGG 47.750 -999.990 ... R5 2008 05 21 12 53 00 -46.4337 51.8478 202.00 197.00 5.00 254389 CRZ 2008 01 10 14 07 00 406-99 P co CCGG 47.230 -999.990 ... R5 2008 05 21 13 07 00 -46.4337 51.8478 202.00 197.00 5.00 254390 CRZ 2008 01 21 07 50 00 91-99 P co CCGG 48.440 -999.990 ... R5 2008 05 21 13 21 00 -46.4337 51.8478 202.00 197.00 5.00 254391 CRZ 2008 01 21 07 50 00 92-99 P co CCGG 47.140 -999.990 ... R5 2008 05 21 13 35 00 -46.4337 51.8478 202.00 197.00 5.00 254392 CRZ 2008 01 31 06 43 00 2699-99 P co CCGG 45.060 -999.990 ... R5 2008 05 22 09 49 00 -46.4337 51.8478 202.00 197.00 5.00 254437 CRZ 2008 01 31 06 43 00 2700-99 P co CCGG 45.040 -999.990 ... R5 2008 05 22 10 03 00 -46.4337 51.8478 202.00 197.00 5.00 254438 CRZ 2008 02 07 07 38 00 1595-99 P co CCGG 44.160 -999.990 ... R5 2008 05 22 10 46 00 -46.4337 51.8478 202.00 197.00 5.00 254435 CRZ 2008 02 07 07 38 00 1596-99 P co CCGG 44.160 -999.990 ... R5 2008 05 22 11 00 00 -46.4337 51.8478 202.00 197.00 5.00 254436 CRZ 2008 02 14 10 57 00 2113-99 P co CCGG 44.280 -999.990 ... R5 2008 05 22 10 18 00 -46.4337 51.8478 202.00 197.00 5.00 254433 CRZ 2008 02 14 10 57 00 2114-99 P co CCGG 43.730 -999.990 ... R5 2008 05 22 10 32 00 -46.4337 51.8478 202.00 197.00 5.00 254434 CRZ 2008 02 20 11 38 00 3317-99 P co CCGG 42.930 -999.990 ... R5 2008 05 21 14 47 00 -46.4337 51.8478 202.00 197.00 5.00 254431 CRZ 2008 02 20 11 38 00 3318-99 P co CCGG 42.360 -999.990 ... R5 2008 05 21 15 01 00 -46.4337 51.8478 202.00 197.00 5.00 254432 CRZ 2008 02 25 06 33 00 2443-99 P co CCGG 43.650 -999.990 ... R5 2008 10 02 13 14 00 -46.4337 51.8478 202.00 197.00 5.00 261861 CRZ 2008 02 25 06 33 00 922-99 P co CCGG 44.080 -999.990 ... R5 2008 10 02 13 28 00 -46.4337 51.8478 202.00 197.00 5.00 261862 CRZ 2008 03 04 05 28 00 1369-99 P co CCGG 42.820 -999.990 ... R5 2008 10 02 13 42 00 -46.4337 51.8478 202.00 197.00 5.00 261859 CRZ 2008 03 04 05 28 00 2604-99 P co CCGG 43.130 -999.990 ... R5 2008 10 02 13 57 00 -46.4337 51.8478 202.00 197.00 5.00 261860 CRZ 2008 03 12 04 05 00 3934-99 P co CCGG 46.220 -999.990 ... R5 2008 10 02 15 22 00 -46.4337 51.8478 202.00 197.00 5.00 261844 CRZ 2008 03 20 10 47 00 4369-99 P co CCGG 41.430 -999.990 ... R5 2008 10 02 12 45 00 -46.4337 51.8478 202.00 197.00 5.00 261857 CRZ 2008 03 20 10 47 00 4528-99 P co CCGG 41.160 -999.990 ... R5 2008 10 02 13 00 00 -46.4337 51.8478 202.00 197.00 5.00 261858 CRZ 2008 03 26 10 36 00 3320-99 P co CCGG 42.180 -999.990 ... R5 2008 10 02 12 31 00 -46.4337 51.8478 202.00 197.00 5.00 261856 CRZ 2008 03 26 10 36 00 3853-99 P co CCGG 41.810 -999.990 ... R5 2008 10 02 12 17 00 -46.4337 51.8478 202.00 197.00 5.00 261855 CRZ 2008 04 02 06 27 00 1769-99 P co CCGG 43.130 -999.990 ... R5 2008 10 02 15 51 00 -46.4337 51.8478 202.00 197.00 5.00 261846 CRZ 2008 04 02 06 27 00 3277-99 P co CCGG 42.660 -999.990 ... R5 2008 10 02 15 37 00 -46.4337 51.8478 202.00 197.00 5.00 261845 CRZ 2008 04 08 05 39 00 1631-99 P co CCGG 43.850 -999.990 ... R5 2008 10 02 15 08 00 -46.4337 51.8478 202.00 197.00 5.00 261843 CRZ 2008 04 18 07 44 00 863-99 P co CCGG 44.140 -999.990 ... R5 2008 10 02 09 54 00 -46.4337 51.8478 202.00 197.00 5.00 261851 CRZ 2008 04 18 07 44 00 864-99 P co CCGG 44.040 -999.990 ... R5 2008 10 02 10 08 00 -46.4337 51.8478 202.00 197.00 5.00 261852 CRZ 2008 04 24 07 23 00 4087-99 P co CCGG 46.000 -999.990 ... R5 2008 10 02 11 48 00 -46.4337 51.8478 202.00 197.00 5.00 261853 CRZ 2008 04 24 07 23 00 4088-99 P co CCGG 45.650 -999.990 ... R5 2008 10 02 12 02 00 -46.4337 51.8478 202.00 197.00 5.00 261854 CRZ 2008 05 06 06 59 00 4775-99 P co CCGG 50.150 -999.990 ... R5 2008 10 02 10 51 00 -46.4337 51.8478 202.00 197.00 5.00 261847 CRZ 2008 05 06 06 59 00 4776-99 P co CCGG 50.080 -999.990 ... R5 2008 10 02 11 05 00 -46.4337 51.8478 202.00 197.00 5.00 261848 CRZ 2008 05 12 06 33 00 539-99 P co CCGG 48.500 -999.990 ... R5 2008 10 02 10 23 00 -46.4337 51.8478 202.00 197.00 5.00 261849 CRZ 2008 05 12 06 33 00 540-99 P co CCGG 48.070 -999.990 ... R5 2008 10 02 10 37 00 -46.4337 51.8478 202.00 197.00 5.00 261850 CRZ 2008 05 19 11 21 00 279-99 P co CCGG 54.600 -999.990 ... R5 2008 10 03 11 30 00 -46.4337 51.8478 202.00 197.00 5.00 261867 CRZ 2008 05 19 11 21 00 280-99 P co CCGG 53.560 -999.990 ... R5 2008 10 03 11 44 00 -46.4337 51.8478 202.00 197.00 5.00 261868 CRZ 2008 05 24 10 09 00 205-99 P co CCGG 58.440 -999.990 ... R5 2008 10 03 11 58 00 -46.4337 51.8478 202.00 197.00 5.00 261869 CRZ 2008 05 24 10 09 00 206-99 P co CCGG 59.560 -999.990 ... R5 2008 10 03 12 12 00 -46.4337 51.8478 202.00 197.00 5.00 261870 CRZ 2008 05 31 05 47 00 3167-99 P co CCGG 50.530 -999.990 ... R5 2008 10 02 16 05 00 -46.4337 51.8478 202.00 197.00 5.00 261863 CRZ 2008 05 31 05 47 00 3168-99 P co CCGG 51.000 -999.990 ... R5 2008 10 02 16 19 00 -46.4337 51.8478 202.00 197.00 5.00 261864 CRZ 2008 06 06 10 11 00 1005-99 P co CCGG 53.580 -999.990 ... R5 2008 10 03 11 01 00 -46.4337 51.8478 202.00 197.00 5.00 261865 CRZ 2008 06 06 10 11 00 1006-99 P co CCGG 52.950 -999.990 ... R5 2008 10 03 11 15 00 -46.4337 51.8478 202.00 197.00 5.00 261866 CRZ 2008 06 13 08 11 00 3027-99 P co CCGG 56.560 -999.990 ... R5 2008 10 06 12 35 00 -46.4337 51.8478 202.00 197.00 5.00 261885 CRZ 2008 06 13 08 11 00 3028-99 P co CCGG 56.500 -999.990 ... R5 2008 10 06 12 49 00 -46.4337 51.8478 202.00 197.00 5.00 261886 CRZ 2008 06 26 06 36 00 927-99 P co CCGG 58.850 -999.990 ... R5 2008 10 06 12 06 00 -46.4337 51.8478 202.00 197.00 5.00 261883 CRZ 2008 06 26 06 36 00 928-99 P co CCGG 57.700 -999.990 ... R5 2008 10 06 12 20 00 -46.4337 51.8478 202.00 197.00 5.00 261884 CRZ 2008 07 02 06 46 00 2394-99 P co CCGG 55.860 -999.990 ... R5 2008 10 03 16 58 00 -46.4337 51.8478 202.00 197.00 5.00 261873 CRZ 2008 07 07 11 32 00 4771-99 P co CCGG 67.820 -999.990 .X. R5 2008 10 06 11 38 00 -46.4337 51.8478 202.00 197.00 5.00 261881 CRZ 2008 07 07 11 32 00 4772-99 P co CCGG 67.670 -999.990 .X. R5 2008 10 06 11 52 00 -46.4337 51.8478 202.00 197.00 5.00 261882 CRZ 2008 07 16 06 23 00 696-99 P co CCGG 56.670 -999.990 ... R5 2008 10 03 16 44 00 -46.4337 51.8478 202.00 197.00 5.00 261874 CRZ 2008 07 20 06 27 00 2259-99 P co CCGG 55.460 -999.990 ... R5 2008 10 06 11 09 00 -46.4337 51.8478 202.00 197.00 5.00 261879 CRZ 2008 07 20 06 27 00 2260-99 P co CCGG 55.390 -999.990 ... R5 2008 10 06 11 23 00 -46.4337 51.8478 202.00 197.00 5.00 261880 CRZ 2008 07 25 10 34 00 3015-99 P co CCGG 68.700 -999.990 .X. R5 2008 10 06 10 40 00 -46.4337 51.8478 202.00 197.00 5.00 261875 CRZ 2008 07 25 10 34 00 3016-99 P co CCGG 68.480 -999.990 .X. R5 2008 10 06 10 55 00 -46.4337 51.8478 202.00 197.00 5.00 261876 CRZ 2008 07 31 12 15 00 581-99 P co CCGG 58.440 -999.990 ... R5 2008 10 06 10 12 00 -46.4337 51.8478 202.00 197.00 5.00 261877 CRZ 2008 07 31 12 15 00 582-99 P co CCGG 58.890 -999.990 ... R5 2008 10 06 10 26 00 -46.4337 51.8478 202.00 197.00 5.00 261878 CRZ 2008 08 07 06 41 00 4309-99 P co CCGG 59.570 -999.990 ... V2 2009 02 03 13 22 00 -46.4337 51.8478 202.00 197.00 5.00 268535 CRZ 2008 08 07 06 41 00 4310-99 P co CCGG 59.850 -999.990 ... V2 2009 02 03 13 37 00 -46.4337 51.8478 202.00 197.00 5.00 268536 CRZ 2008 08 14 06 17 00 1151-99 P co CCGG 60.530 -999.990 ... V2 2009 02 02 13 16 00 -46.4337 51.8478 202.00 197.00 5.00 268509 CRZ 2008 08 14 06 17 00 1152-99 P co CCGG 60.510 -999.990 ... V2 2009 02 02 13 32 00 -46.4337 51.8478 202.00 197.00 5.00 268510 CRZ 2008 08 20 10 00 00 1037-99 P co CCGG 61.430 -999.990 ... V2 2009 02 03 12 51 00 -46.4337 51.8478 202.00 197.00 5.00 268533 CRZ 2008 08 20 10 00 00 1038-99 P co CCGG 61.200 -999.990 ... V2 2009 02 03 13 06 00 -46.4337 51.8478 202.00 197.00 5.00 268534 CRZ 2008 09 05 11 12 00 47-99 P co CCGG 61.330 -999.990 ... V2 2009 02 03 12 20 00 -46.4337 51.8478 202.00 197.00 5.00 268531 CRZ 2008 09 05 11 12 00 48-99 P co CCGG 61.380 -999.990 ... V2 2009 02 03 12 35 00 -46.4337 51.8478 202.00 197.00 5.00 268532 CRZ 2008 09 10 10 42 00 1442-99 P co CCGG 73.570 -999.990 .X. V2 2009 02 03 10 48 00 -46.4337 51.8478 202.00 197.00 5.00 268527 CRZ 2008 09 20 06 05 00 3161-99 P co CCGG 62.110 -999.990 ... V2 2009 02 03 11 03 00 -46.4337 51.8478 202.00 197.00 5.00 268528 CRZ 2008 09 27 11 08 00 33-99 P co CCGG 66.350 -999.990 ... V2 2009 02 03 11 49 00 -46.4337 51.8478 202.00 197.00 5.00 268529 CRZ 2008 09 27 11 08 00 34-99 P co CCGG 65.220 -999.990 ... V2 2009 02 03 12 05 00 -46.4337 51.8478 202.00 197.00 5.00 268530 CRZ 2008 10 06 13 11 00 3523-99 P co CCGG 60.710 -999.990 ... V2 2009 02 02 12 45 00 -46.4337 51.8478 202.00 197.00 5.00 268512 CRZ 2008 10 14 11 31 00 347-99 P co CCGG 60.800 -999.990 ... R5 2009 02 02 11 43 00 -46.4337 51.8478 202.00 197.00 5.00 268487 CRZ 2008 10 14 11 31 00 348-99 P co CCGG 60.910 -999.990 ... R5 2009 02 02 11 58 00 -46.4337 51.8478 202.00 197.00 5.00 268488 CRZ 2008 10 19 10 33 00 4473-99 P co CCGG 59.960 -999.990 ... R5 2009 02 02 12 41 00 -46.4337 51.8478 202.00 197.00 5.00 268491 CRZ 2008 10 19 10 33 00 4474-99 P co CCGG 60.100 -999.990 ... R5 2009 02 02 12 55 00 -46.4337 51.8478 202.00 197.00 5.00 268492 CRZ 2008 10 27 09 48 00 4841-99 P co CCGG 59.570 -999.990 ... R5 2009 02 02 15 32 00 -46.4337 51.8478 202.00 197.00 5.00 268513 CRZ 2008 10 27 09 48 00 4842-99 P co CCGG 58.960 -999.990 ... R5 2009 02 02 15 46 00 -46.4337 51.8478 202.00 197.00 5.00 268514 CRZ 2008 11 04 12 53 00 4295-99 P co CCGG 58.940 -999.990 ... V2 2009 02 02 13 01 00 -46.4337 51.8478 202.00 197.00 5.00 268511 CRZ 2008 11 12 07 00 00 525-99 P co CCGG 55.620 -999.990 ... R5 2009 02 02 16 01 00 -46.4337 51.8478 202.00 197.00 5.00 268515 CRZ 2008 11 12 07 00 00 526-99 P co CCGG 55.750 -999.990 ... R5 2009 02 02 16 15 00 -46.4337 51.8478 202.00 197.00 5.00 268516 CRZ 2008 11 24 10 46 00 4789-99 P co CCGG 54.380 -999.990 ... R5 2009 02 02 12 12 00 -46.4337 51.8478 202.00 197.00 5.00 268489 CRZ 2008 11 24 10 46 00 4790-99 P co CCGG 55.060 -999.990 ... R5 2009 02 02 12 26 00 -46.4337 51.8478 202.00 197.00 5.00 268490 CRZ 2008 12 01 10 48 00 565-99 P co CCGG 52.130 -999.990 ... R5 2009 02 02 11 15 00 -46.4337 51.8478 202.00 197.00 5.00 268485 CRZ 2008 12 01 10 48 00 566-99 P co CCGG 51.770 -999.990 ... R5 2009 02 02 11 29 00 -46.4337 51.8478 202.00 197.00 5.00 268486 CRZ 2008 12 09 15 03 00 4371-99 P co CCGG 47.710 -999.990 ... R5 2009 05 07 16 42 00 -46.4337 51.8478 202.00 197.00 5.00 274610 CRZ 2008 12 16 07 03 00 3411-99 P co CCGG 48.990 -999.990 ... V2 2009 05 02 13 33 00 -46.4337 51.8478 202.00 197.00 5.00 274635 CRZ 2008 12 16 07 03 00 3412-99 P co CCGG 49.660 -999.990 ... V2 2009 05 02 13 48 00 -46.4337 51.8478 202.00 197.00 5.00 274636 CRZ 2008 12 22 12 00 00 1229-99 P co CCGG 47.540 -999.990 ... V2 2009 05 02 12 31 00 -46.4337 51.8478 202.00 197.00 5.00 274631 CRZ 2008 12 22 12 00 00 1230-99 P co CCGG 47.270 -999.990 ... V2 2009 05 02 12 47 00 -46.4337 51.8478 202.00 197.00 5.00 274632 CRZ 2008 12 30 10 57 00 385-99 P co CCGG 46.100 -999.990 ... V2 2009 05 02 13 02 00 -46.4337 51.8478 202.00 197.00 5.00 274633 CRZ 2008 12 30 10 57 00 386-99 P co CCGG 45.400 -999.990 ... V2 2009 05 02 13 18 00 -46.4337 51.8478 202.00 197.00 5.00 274634 CRZ 2009 01 07 11 53 00 1629-99 P co CCGG 44.390 -999.990 ... R5 2009 05 04 13 23 00 -46.4337 51.8478 202.00 197.00 5.00 274615 CRZ 2009 01 07 11 53 00 1630-99 P co CCGG 44.800 -999.990 ... R5 2009 05 04 13 38 00 -46.4337 51.8478 202.00 197.00 5.00 274616 CRZ 2009 01 14 04 41 00 3493-99 P co CCGG 41.470 -999.990 ... R5 2009 05 04 12 55 00 -46.4337 51.8478 202.00 197.00 5.00 274613 CRZ 2009 01 14 04 41 00 3494-99 P co CCGG 39.920 -999.990 ... R5 2009 05 04 13 09 00 -46.4337 51.8478 202.00 197.00 5.00 274614 CRZ 2009 01 19 07 02 00 1179-99 P co CCGG 42.990 -999.990 ... R5 2009 05 01 16 22 00 -46.4337 51.8478 202.00 197.00 5.00 274629 CRZ 2009 01 19 07 02 00 1180-99 P co CCGG 42.650 -999.990 ... R5 2009 05 01 16 36 00 -46.4337 51.8478 202.00 197.00 5.00 274630 CRZ 2009 01 27 10 36 00 4575-99 P co CCGG 45.240 -999.990 ... R5 2009 05 04 12 26 00 -46.4337 51.8478 202.00 197.00 5.00 274611 CRZ 2009 01 27 10 36 00 4576-99 P co CCGG 44.230 -999.990 ... R5 2009 05 04 12 40 00 -46.4337 51.8478 202.00 197.00 5.00 274612 CRZ 2009 02 08 06 45 00 1787-99 P co CCGG 41.950 -999.990 ... V2 2009 05 02 15 36 00 -46.4337 51.8478 202.00 197.00 5.00 274623 CRZ 2009 02 08 06 45 00 1788-99 P co CCGG 41.680 -999.990 ... V2 2009 05 02 15 51 00 -46.4337 51.8478 202.00 197.00 5.00 274624 CRZ 2009 02 13 11 23 00 1359-99 P co CCGG 42.420 -999.990 ... V2 2009 05 02 15 05 00 -46.4337 51.8478 202.00 197.00 5.00 274621 CRZ 2009 02 13 11 23 00 1360-99 P co CCGG 43.310 -999.990 ... V2 2009 05 02 15 21 00 -46.4337 51.8478 202.00 197.00 5.00 274622 CRZ 2009 02 17 10 25 00 175-99 P co CCGG 43.150 -999.990 ... V2 2009 05 02 14 04 00 -46.4337 51.8478 202.00 197.00 5.00 274617 CRZ 2009 02 17 10 25 00 176-99 P co CCGG 42.220 -999.990 ... V2 2009 05 02 14 19 00 -46.4337 51.8478 202.00 197.00 5.00 274618 CRZ 2009 03 03 05 22 00 583-99 P co CCGG 40.850 -999.990 ... V2 2009 05 02 14 35 00 -46.4337 51.8478 202.00 197.00 5.00 274619 CRZ 2009 03 03 05 22 00 584-99 P co CCGG 40.520 -999.990 ... V2 2009 05 02 14 50 00 -46.4337 51.8478 202.00 197.00 5.00 274620 CRZ 2009 03 12 05 22 00 4035-99 P co CCGG 40.810 -999.990 ... R5 2009 05 04 16 43 00 -46.4337 51.8478 202.00 197.00 5.00 274627 CRZ 2009 03 12 05 22 00 4036-99 P co CCGG 40.960 -999.990 ... R5 2009 05 04 16 58 00 -46.4337 51.8478 202.00 197.00 5.00 274628 CRZ 2009 03 16 11 15 00 21-99 P co CCGG 42.250 -999.990 ... V2 2009 05 05 10 57 00 -46.4337 51.8478 202.00 197.00 5.00 274625 CRZ 2009 03 16 11 15 00 22-99 P co CCGG 41.750 -999.990 ... V2 2009 05 05 11 13 00 -46.4337 51.8478 202.00 197.00 5.00 274626 CRZ 2009 03 30 10 40 00 2249-99 P co CCGG 42.450 -999.990 ... R5 2009 09 30 16 00 00 -46.4337 51.8478 202.00 197.00 5.00 284273 CRZ 2009 03 30 10 40 00 2250-99 P co CCGG 42.060 -999.990 ... R5 2009 09 30 16 14 00 -46.4337 51.8478 202.00 197.00 5.00 284274 CRZ 2009 04 08 10 25 00 5039-99 P co CCGG 43.250 -999.990 ... R5 2009 09 30 15 32 00 -46.4337 51.8478 202.00 197.00 5.00 284271 CRZ 2009 04 08 10 25 00 5040-99 P co CCGG 43.390 -999.990 ... R5 2009 09 30 15 46 00 -46.4337 51.8478 202.00 197.00 5.00 284272 CRZ 2009 04 16 05 05 00 4055-99 P co CCGG 42.360 -999.990 ... R5 2009 09 30 15 03 00 -46.4337 51.8478 202.00 197.00 5.00 284269 CRZ 2009 04 16 05 05 00 4056-99 P co CCGG 44.610 -999.990 ... R5 2009 09 30 15 17 00 -46.4337 51.8478 202.00 197.00 5.00 284270 CRZ 2009 04 20 04 40 00 4171-99 P co CCGG 43.720 -999.990 ... R5 2009 09 30 14 35 00 -46.4337 51.8478 202.00 197.00 5.00 284267 CRZ 2009 04 20 04 40 00 4172-99 P co CCGG 43.120 -999.990 ... R5 2009 09 30 14 49 00 -46.4337 51.8478 202.00 197.00 5.00 284268 CRZ 2009 05 05 06 04 00 2809-99 P co CCGG 46.380 -999.990 ... V2 2009 09 30 16 43 00 -46.4337 51.8478 202.00 197.00 5.00 284281 CRZ 2009 05 05 06 04 00 2810-99 P co CCGG 45.870 -999.990 ... V2 2009 09 30 16 59 00 -46.4337 51.8478 202.00 197.00 5.00 284282 CRZ 2009 05 15 04 55 00 895-99 P co CCGG 46.760 -999.990 ... V2 2009 09 30 16 12 00 -46.4337 51.8478 202.00 197.00 5.00 284279 CRZ 2009 05 15 04 55 00 896-99 P co CCGG 47.570 -999.990 ... V2 2009 09 30 16 28 00 -46.4337 51.8478 202.00 197.00 5.00 284280 CRZ 2009 05 22 06 08 00 1663-99 P co CCGG 48.190 -999.990 ... V2 2009 09 30 15 42 00 -46.4337 51.8478 202.00 197.00 5.00 284277 CRZ 2009 05 22 06 08 00 1664-99 P co CCGG 48.590 -999.990 ... V2 2009 09 30 15 57 00 -46.4337 51.8478 202.00 197.00 5.00 284278 CRZ 2009 05 30 05 54 00 199-99 P co CCGG 50.830 -999.990 ... V2 2009 09 30 15 11 00 -46.4337 51.8478 202.00 197.00 5.00 284275 CRZ 2009 05 30 05 54 00 200-99 P co CCGG 49.370 -999.990 ... V2 2009 09 30 15 26 00 -46.4337 51.8478 202.00 197.00 5.00 284276 CRZ 2009 06 08 04 48 00 2065-99 P co CCGG 51.930 -999.990 ... V2 2009 09 29 15 02 00 -46.4337 51.8478 202.00 197.00 5.00 284255 CRZ 2009 06 08 04 48 00 2066-99 P co CCGG 51.960 -999.990 ... V2 2009 09 29 15 17 00 -46.4337 51.8478 202.00 197.00 5.00 284256 CRZ 2009 06 18 05 25 00 1015-99 P co CCGG 51.830 -999.990 ... V2 2009 09 29 14 31 00 -46.4337 51.8478 202.00 197.00 5.00 284257 CRZ 2009 06 18 05 25 00 1016-99 P co CCGG 51.520 -999.990 ... V2 2009 09 29 14 46 00 -46.4337 51.8478 202.00 197.00 5.00 284258 CRZ 2009 06 29 10 40 00 591-99 P co CCGG 54.790 -999.990 ... V2 2009 09 29 13 29 00 -46.4337 51.8478 202.00 197.00 5.00 284251 CRZ 2009 06 29 10 40 00 592-99 P co CCGG 54.180 -999.990 ... V2 2009 09 29 13 45 00 -46.4337 51.8478 202.00 197.00 5.00 284252 CRZ 2009 07 06 06 53 00 4105-99 P co CCGG 53.250 -999.990 ... V2 2009 09 29 14 00 00 -46.4337 51.8478 202.00 197.00 5.00 284253 CRZ 2009 07 06 06 53 00 4106-99 P co CCGG 53.490 -999.990 ... V2 2009 09 29 14 16 00 -46.4337 51.8478 202.00 197.00 5.00 284254 CRZ 2009 07 13 12 24 00 3601-99 P co CCGG 58.170 -999.990 ... V2 2009 09 30 12 37 00 -46.4337 51.8478 202.00 197.00 5.00 284265 CRZ 2009 07 13 12 24 00 3602-99 P co CCGG 58.140 -999.990 ... V2 2009 09 30 12 52 00 -46.4337 51.8478 202.00 197.00 5.00 284266 CRZ 2009 07 29 05 21 00 4811-99 P co CCGG 55.940 -999.990 ... V2 2009 09 30 12 06 00 -46.4337 51.8478 202.00 197.00 5.00 284263 CRZ 2009 07 29 05 21 00 4812-99 P co CCGG 56.070 -999.990 ... V2 2009 09 30 12 21 00 -46.4337 51.8478 202.00 197.00 5.00 284264 CRZ 2009 08 04 05 32 00 4065-99 P co CCGG 65.590 -999.990 ... V2 2009 09 30 11 35 00 -46.4337 51.8478 202.00 197.00 5.00 284261 CRZ 2009 08 04 05 32 00 4066-99 P co CCGG 64.820 -999.990 ... V2 2009 09 30 11 50 00 -46.4337 51.8478 202.00 197.00 5.00 284262 CRZ 2009 08 13 05 57 00 2215-99 P co CCGG 58.950 -999.990 ... V2 2009 09 30 11 04 00 -46.4337 51.8478 202.00 197.00 5.00 284259 CRZ 2009 08 13 05 57 00 2216-99 P co CCGG 58.720 -999.990 ... V2 2009 09 30 11 20 00 -46.4337 51.8478 202.00 197.00 5.00 284260 CRZ 2009 08 17 06 20 00 1925-99 P co CCGG 60.320 -999.990 ... V2 2010 04 01 14 15 00 -46.4337 51.8478 202.00 197.00 5.00 292794 CRZ 2009 08 17 06 20 00 1926-99 P co CCGG 59.080 -999.990 ... V2 2010 04 01 14 30 00 -46.4337 51.8478 202.00 197.00 5.00 292795 CRZ 2009 08 25 12 46 00 339-99 P co CCGG 58.020 -999.990 ... V2 2010 04 01 14 46 00 -46.4337 51.8478 202.00 197.00 5.00 292796 CRZ 2009 08 25 12 46 00 340-99 P co CCGG 59.800 -999.990 ... V2 2010 04 01 15 01 00 -46.4337 51.8478 202.00 197.00 5.00 292797 CRZ 2009 09 01 11 03 00 4987-99 P co CCGG 59.200 -999.990 ... V2 2010 04 01 13 14 00 -46.4337 51.8478 202.00 197.00 5.00 292790 CRZ 2009 09 01 11 03 00 4988-99 P co CCGG 58.980 -999.990 ... V2 2010 04 01 13 29 00 -46.4337 51.8478 202.00 197.00 5.00 292791 CRZ 2009 09 15 05 25 00 3363-99 P co CCGG 61.160 -999.990 ... V2 2010 04 01 13 44 00 -46.4337 51.8478 202.00 197.00 5.00 292792 CRZ 2009 09 15 05 25 00 3364-99 P co CCGG 60.050 -999.990 ... V2 2010 04 01 14 00 00 -46.4337 51.8478 202.00 197.00 5.00 292793 CRZ 2009 09 28 11 55 00 181-99 P co CCGG 61.380 -999.990 ... V2 2010 04 02 13 07 00 -46.4337 51.8478 202.00 197.00 5.00 292788 CRZ 2009 09 28 11 55 00 182-99 P co CCGG 60.500 -999.990 ... V2 2010 04 02 13 23 00 -46.4337 51.8478 202.00 197.00 5.00 292789 CRZ 2009 10 13 05 39 00 4515-99 P co CCGG 57.180 -999.990 ... V2 2010 04 02 15 09 00 -46.4337 51.8478 202.00 197.00 5.00 292786 CRZ 2009 10 13 05 39 00 4516-99 P co CCGG 56.950 -999.990 ... V2 2010 04 02 15 25 00 -46.4337 51.8478 202.00 197.00 5.00 292787 CRZ 2009 10 21 06 30 00 613-99 P co CCGG 61.490 -999.990 ... V2 2010 04 02 14 08 00 -46.4337 51.8478 202.00 197.00 5.00 292784 CRZ 2009 10 21 06 30 00 614-99 P co CCGG 59.420 -999.990 ... V2 2010 04 02 14 24 00 -46.4337 51.8478 202.00 197.00 5.00 292785 CRZ 2009 10 30 10 00 00 2975-99 P co CCGG 57.440 -999.990 ... V2 2010 04 02 13 38 00 -46.4337 51.8478 202.00 197.00 5.00 292782 CRZ 2009 10 30 10 00 00 2976-99 P co CCGG 56.570 -999.990 ... V2 2010 04 02 13 53 00 -46.4337 51.8478 202.00 197.00 5.00 292783 CRZ 2009 11 10 05 12 00 1287-99 P co CCGG 60.370 -999.990 P.. V2 2010 05 13 12 07 00 -46.4337 51.8478 202.00 197.00 5.00 295454 CRZ 2009 11 10 05 12 00 1288-99 P co CCGG 67.710 -999.990 P.. V2 2010 05 13 12 22 00 -46.4337 51.8478 202.00 197.00 5.00 295455 CRZ 2009 12 02 06 46 00 1701-99 P co CCGG 49.380 -999.990 P.. V2 2010 05 13 11 36 00 -46.4337 51.8478 202.00 197.00 5.00 295452 CRZ 2009 12 02 06 46 00 1702-99 P co CCGG 52.830 -999.990 P.. V2 2010 05 13 11 51 00 -46.4337 51.8478 202.00 197.00 5.00 295453 CRZ 2009 12 07 10 42 00 767-99 P co CCGG 48.780 -999.990 ... V2 2010 05 13 11 06 00 -46.4337 51.8478 202.00 197.00 5.00 295450 CRZ 2009 12 07 10 42 00 768-99 P co CCGG 49.160 -999.990 ... V2 2010 05 13 11 21 00 -46.4337 51.8478 202.00 197.00 5.00 295451 CRZ 2009 12 19 12 50 00 1651-99 P co CCGG 47.190 -999.990 ... V2 2010 05 13 10 35 00 -46.4337 51.8478 202.00 197.00 5.00 295448 CRZ 2009 12 19 12 50 00 1652-99 P co CCGG 47.030 -999.990 ... V2 2010 05 13 10 50 00 -46.4337 51.8478 202.00 197.00 5.00 295449 CRZ 2009 12 25 10 04 00 2937-99 P co CCGG 48.160 -999.990 ... V2 2010 05 17 12 45 00 -46.4337 51.8478 202.00 197.00 5.00 295442 CRZ 2009 12 25 10 04 00 2938-99 P co CCGG 49.060 -999.990 ... V2 2010 05 17 13 00 00 -46.4337 51.8478 202.00 197.00 5.00 295443 CRZ 2009 12 29 10 20 00 525-99 P co CCGG 45.690 -999.990 ... V2 2010 05 17 11 44 00 -46.4337 51.8478 202.00 197.00 5.00 295444 CRZ 2009 12 29 10 20 00 526-99 P co CCGG 45.600 -999.990 ... V2 2010 05 17 11 59 00 -46.4337 51.8478 202.00 197.00 5.00 295445 CRZ 2010 01 05 10 29 00 3351-99 P co CCGG 46.930 -999.990 ... V2 2010 05 17 12 15 00 -46.4337 51.8478 202.00 197.00 5.00 295446 CRZ 2010 01 05 10 29 00 3352-99 P co CCGG 46.990 -999.990 ... V2 2010 05 17 12 30 00 -46.4337 51.8478 202.00 197.00 5.00 295447 CRZ 2010 01 11 11 22 00 1453-99 P co CCGG 53.420 -999.990 .X. V2 2010 05 13 14 10 00 -46.4337 51.8478 202.00 197.00 5.00 295440 CRZ 2010 01 11 11 22 00 1454-99 P co CCGG 53.590 -999.990 .X. V2 2010 05 13 14 25 00 -46.4337 51.8478 202.00 197.00 5.00 295441 CRZ 2010 01 19 06 30 00 3599-99 P co CCGG 50.900 -999.990 ... V2 2010 05 13 13 09 00 -46.4337 51.8478 202.00 197.00 5.00 295436 CRZ 2010 01 19 06 30 00 3600-99 P co CCGG 49.570 -999.990 ... V2 2010 05 13 13 24 00 -46.4337 51.8478 202.00 197.00 5.00 295437 CRZ 2010 01 25 13 57 00 995-99 P co CCGG 41.330 -999.990 ... V2 2010 05 13 13 39 00 -46.4337 51.8478 202.00 197.00 5.00 295438 CRZ 2010 01 25 13 57 00 996-99 P co CCGG 41.020 -999.990 ... V2 2010 05 13 13 54 00 -46.4337 51.8478 202.00 197.00 5.00 295439 CRZ 2010 02 01 10 30 00 331-99 P co CCGG 41.750 -999.990 ... V2 2010 05 13 12 38 00 -46.4337 51.8478 202.00 197.00 5.00 295434 CRZ 2010 02 01 10 30 00 332-99 P co CCGG 41.510 -999.990 ... V2 2010 05 13 12 53 00 -46.4337 51.8478 202.00 197.00 5.00 295435 CRZ 2010 02 08 11 58 00 2767-99 P co CCGG 41.930 -999.990 ... V2 2010 05 13 15 11 00 -46.4337 51.8478 202.00 197.00 5.00 295432 CRZ 2010 02 08 11 58 00 2768-99 P co CCGG 41.190 -999.990 ... V2 2010 05 13 15 26 00 -46.4337 51.8478 202.00 197.00 5.00 295433 CRZ 2010 02 14 13 03 00 4857-99 P co CCGG 40.560 -999.990 ... V2 2010 05 13 16 12 00 -46.4337 51.8478 202.00 197.00 5.00 295430 CRZ 2010 02 14 13 03 00 4858-99 P co CCGG 41.250 -999.990 ... V2 2010 05 13 16 27 00 -46.4337 51.8478 202.00 197.00 5.00 295431 CRZ 2010 02 22 06 04 00 3861-99 P co CCGG 42.490 -999.990 ... V2 2010 05 13 14 40 00 -46.4337 51.8478 202.00 197.00 5.00 295426 CRZ 2010 02 22 06 04 00 3862-99 P co CCGG 42.330 -999.990 ... V2 2010 05 13 14 55 00 -46.4337 51.8478 202.00 197.00 5.00 295427 CRZ 2010 03 01 11 58 00 3915-99 P co CCGG 40.970 -999.990 ... V2 2010 05 13 15 41 00 -46.4337 51.8478 202.00 197.00 5.00 295428 CRZ 2010 03 01 11 58 00 3916-99 P co CCGG 40.590 -999.990 ... V2 2010 05 13 15 56 00 -46.4337 51.8478 202.00 197.00 5.00 295429 CRZ 2010 03 08 12 28 00 3497-99 P co CCGG 42.060 -999.990 ... V2 2010 09 29 15 37 00 -46.4337 51.8478 202.00 197.00 5.00 304702 CRZ 2010 03 08 12 28 00 3860-99 P co CCGG 41.940 -999.990 ... V2 2010 09 29 15 53 00 -46.4337 51.8478 202.00 197.00 5.00 304703 CRZ 2010 03 22 07 24 00 222-99 P co CCGG 42.300 -999.990 ... V2 2010 09 29 16 23 00 -46.4337 51.8478 202.00 197.00 5.00 304705 CRZ 2010 03 22 07 24 00 2764-99 P co CCGG 42.590 -999.990 ... V2 2010 09 29 16 08 00 -46.4337 51.8478 202.00 197.00 5.00 304704 CRZ 2010 03 31 11 33 00 1241-99 P co CCGG 43.060 -999.990 ... V2 2010 09 29 14 52 00 -46.4337 51.8478 202.00 197.00 5.00 304699 CRZ 2010 03 31 11 33 00 575-99 P co CCGG 43.590 -999.990 ... V2 2010 09 29 14 36 00 -46.4337 51.8478 202.00 197.00 5.00 304698 CRZ 2010 04 05 06 12 00 1025-99 P co CCGG 43.350 -999.990 ... V2 2010 09 29 15 07 00 -46.4337 51.8478 202.00 197.00 5.00 304700 CRZ 2010 04 05 06 12 00 2796-99 P co CCGG 43.620 -999.990 ... V2 2010 09 29 15 22 00 -46.4337 51.8478 202.00 197.00 5.00 304701 CRZ 2010 04 15 12 45 00 2414-99 P co CCGG 45.430 -999.990 ... V2 2010 09 29 17 24 00 -46.4337 51.8478 202.00 197.00 5.00 304723 CRZ 2010 04 15 12 45 00 605-99 P co CCGG 45.650 -999.990 ... V2 2010 09 29 17 09 00 -46.4337 51.8478 202.00 197.00 5.00 304722 CRZ 2010 04 21 06 00 00 1970-99 P co CCGG 44.010 -999.990 ... V2 2010 09 30 14 45 00 -46.4337 51.8478 202.00 197.00 5.00 304725 CRZ 2010 04 21 06 00 00 3817-99 P co CCGG 44.790 -999.990 ... V2 2010 09 30 14 29 00 -46.4337 51.8478 202.00 197.00 5.00 304724 CRZ 2010 04 29 12 46 00 1472-99 P co CCGG 45.030 -999.990 ... V2 2010 09 29 16 54 00 -46.4337 51.8478 202.00 197.00 5.00 304721 CRZ 2010 04 29 12 46 00 1855-99 P co CCGG 45.250 -999.990 ... V2 2010 09 29 16 39 00 -46.4337 51.8478 202.00 197.00 5.00 304720 CRZ 2010 05 05 05 46 00 1888-99 P co CCGG 46.850 -999.990 ... V2 2010 09 30 15 15 00 -46.4337 51.8478 202.00 197.00 5.00 304719 CRZ 2010 05 13 06 38 00 497-99 P co CCGG 47.560 -999.990 ... V2 2010 09 29 11 33 00 -46.4337 51.8478 202.00 197.00 5.00 304744 CRZ 2010 05 13 06 38 00 498-99 P co CCGG 47.390 -999.990 ... V2 2010 09 29 11 48 00 -46.4337 51.8478 202.00 197.00 5.00 304745 CRZ 2010 05 17 10 36 00 207-99 P co CCGG 50.800 -999.990 ... V2 2010 09 29 12 04 00 -46.4337 51.8478 202.00 197.00 5.00 304742 CRZ 2010 05 17 10 36 00 208-99 P co CCGG 49.150 -999.990 ... V2 2010 09 29 12 19 00 -46.4337 51.8478 202.00 197.00 5.00 304743 CRZ 2010 05 25 11 00 00 1103-99 P co CCGG 49.150 -999.990 ... V2 2010 09 28 17 17 00 -46.4337 51.8478 202.00 197.00 5.00 304738 CRZ 2010 05 25 11 00 00 1104-99 P co CCGG 49.850 -999.990 ... V2 2010 09 28 17 33 00 -46.4337 51.8478 202.00 197.00 5.00 304739 CRZ 2010 06 06 07 19 00 2535-99 P co CCGG 49.530 -999.990 ... V2 2010 09 29 11 02 00 -46.4337 51.8478 202.00 197.00 5.00 304740 CRZ 2010 06 06 07 19 00 2536-99 P co CCGG 49.640 -999.990 ... V2 2010 09 29 11 18 00 -46.4337 51.8478 202.00 197.00 5.00 304741 CRZ 2010 06 09 06 25 00 327-99 P co CCGG 50.520 -999.990 ... V2 2010 09 29 12 34 00 -46.4337 51.8478 202.00 197.00 5.00 304752 CRZ 2010 06 09 06 25 00 328-99 P co CCGG 50.680 -999.990 ... V2 2010 09 29 12 49 00 -46.4337 51.8478 202.00 197.00 5.00 304753 CRZ 2010 06 16 06 34 00 3707-99 P co CCGG 53.000 -999.990 ... V2 2010 09 29 14 06 00 -46.4337 51.8478 202.00 197.00 5.00 304750 CRZ 2010 06 16 06 34 00 3708-99 P co CCGG 52.030 -999.990 ... V2 2010 09 29 14 21 00 -46.4337 51.8478 202.00 197.00 5.00 304751 CRZ 2010 06 26 10 03 00 3719-99 P co CCGG 53.150 -999.990 ... V2 2010 09 29 13 05 00 -46.4337 51.8478 202.00 197.00 5.00 304748 CRZ 2010 06 26 10 03 00 3720-99 P co CCGG 52.880 -999.990 ... V2 2010 09 29 13 20 00 -46.4337 51.8478 202.00 197.00 5.00 304749 CRZ 2010 06 29 06 58 00 3111-99 P co CCGG 54.710 -999.990 ... V2 2010 09 29 13 35 00 -46.4337 51.8478 202.00 197.00 5.00 304746 CRZ 2010 06 29 06 58 00 3112-99 P co CCGG 54.000 -999.990 ... V2 2010 09 29 13 50 00 -46.4337 51.8478 202.00 197.00 5.00 304747 CRZ 2010 07 12 11 03 00 3395-99 P co CCGG 55.700 -999.990 ... V2 2010 12 20 15 03 00 -46.4337 51.8478 202.00 197.00 5.00 309313 CRZ 2010 07 12 11 03 00 3396-99 P co CCGG 55.070 -999.990 ... V2 2010 12 20 15 20 00 -46.4337 51.8478 202.00 197.00 5.00 309314 CRZ 2010 07 19 08 00 00 5009-99 P co CCGG 58.300 -999.990 ... V2 2010 12 20 16 08 00 -46.4337 51.8478 202.00 197.00 5.00 309307 CRZ 2010 07 19 08 00 00 5010-99 P co CCGG 58.270 -999.990 ... V2 2010 12 20 16 25 00 -46.4337 51.8478 202.00 197.00 5.00 309308 CRZ 2010 08 03 10 35 00 1479-99 P co CCGG 61.200 -999.990 ... V2 2010 12 20 15 36 00 -46.4337 51.8478 202.00 197.00 5.00 309312 CRZ 2010 08 03 10 35 00 1480-99 P co CCGG 61.660 -999.990 ... V2 2010 12 20 15 52 00 -46.4337 51.8478 202.00 197.00 5.00 309311 CRZ 2010 08 07 11 20 00 1599-99 P co CCGG 59.240 -999.990 ... V2 2010 12 20 16 41 00 -46.4337 51.8478 202.00 197.00 5.00 309309 CRZ 2010 08 07 11 20 00 1600-99 P co CCGG 60.130 -999.990 ... V2 2010 12 20 16 57 00 -46.4337 51.8478 202.00 197.00 5.00 309310 CRZ 2010 08 13 09 37 00 163-99 P co CCGG 64.760 -999.990 ... V2 2010 12 16 14 10 00 -46.4337 51.8478 202.00 197.00 5.00 309299 CRZ 2010 08 13 09 37 00 164-99 P co CCGG 63.650 -999.990 ... V2 2010 12 16 14 26 00 -46.4337 51.8478 202.00 197.00 5.00 309300 CRZ 2010 08 24 13 13 00 553-99 P co CCGG 63.100 -999.990 ... V2 2010 12 16 14 42 00 -46.4337 51.8478 202.00 197.00 5.00 309301 CRZ 2010 08 24 13 13 00 554-99 P co CCGG 62.130 -999.990 ... V2 2010 12 16 14 58 00 -46.4337 51.8478 202.00 197.00 5.00 309302 CRZ 2010 08 27 15 00 00 137-99 P co CCGG 63.260 -999.990 ... V2 2010 12 16 15 31 00 -46.4337 51.8478 202.00 197.00 5.00 309304 CRZ 2010 08 27 15 00 00 2099-99 P co CCGG 61.790 -999.990 ... V2 2010 12 16 15 15 00 -46.4337 51.8478 202.00 197.00 5.00 309303 CRZ 2010 09 08 05 53 00 2083-99 P co CCGG 62.420 -999.990 ... V2 2010 12 16 15 47 00 -46.4337 51.8478 202.00 197.00 5.00 309305 CRZ 2010 09 08 05 53 00 2211-99 P co CCGG 61.970 -999.990 ... V2 2010 12 16 16 03 00 -46.4337 51.8478 202.00 197.00 5.00 309306 CRZ 2010 09 13 08 00 00 2347-99 P co CCGG 65.150 -999.990 ... V2 2010 12 21 16 34 00 -46.4337 51.8478 202.00 197.00 5.00 309297 CRZ 2010 09 13 08 00 00 2698-99 P co CCGG 63.530 -999.990 ... V2 2010 12 21 16 50 00 -46.4337 51.8478 202.00 197.00 5.00 309298 CRZ 2010 09 21 07 59 00 1023-99 P co CCGG 71.090 -999.990 ... V2 2010 12 21 15 45 00 -46.4337 51.8478 202.00 197.00 5.00 309294 CRZ 2010 09 21 07 59 00 822-99 P co CCGG 71.090 -999.990 ... V2 2010 12 21 15 29 00 -46.4337 51.8478 202.00 197.00 5.00 309293 CRZ 2010 09 21 11 09 00 2685-99 P co CCGG 67.600 -999.990 ... V2 2010 12 21 16 01 00 -46.4337 51.8478 202.00 197.00 5.00 309295 CRZ 2010 09 21 11 09 00 3282-99 P co CCGG 65.360 -999.990 ... V2 2010 12 21 16 18 00 -46.4337 51.8478 202.00 197.00 5.00 309296 CRZ 2010 10 09 11 30 00 1780-99 P co CCGG 63.440 -999.990 ... V2 2010 12 20 13 10 00 -46.4337 51.8478 202.00 197.00 5.00 309286 CRZ 2010 10 09 11 30 00 1961-99 P co CCGG 63.200 -999.990 ... V2 2010 12 20 12 53 00 -46.4337 51.8478 202.00 197.00 5.00 309285 CRZ 2010 10 14 11 56 00 148-99 P co CCGG 66.290 -999.990 ... V2 2010 12 20 13 26 00 -46.4337 51.8478 202.00 197.00 5.00 309287 CRZ 2010 10 14 11 56 00 3197-99 P co CCGG 66.720 -999.990 ... V2 2010 12 20 13 42 00 -46.4337 51.8478 202.00 197.00 5.00 309288 CRZ 2010 10 24 06 56 00 3092-99 P co CCGG 67.370 -999.990 ... V2 2010 12 20 13 58 00 -46.4337 51.8478 202.00 197.00 5.00 309289 CRZ 2010 10 24 06 56 00 3732-99 P co CCGG 66.900 -999.990 ... V2 2010 12 20 14 15 00 -46.4337 51.8478 202.00 197.00 5.00 309290 CRZ 2010 10 26 12 24 00 2265-99 P co CCGG 69.780 -999.990 ... V2 2010 12 20 14 31 00 -46.4337 51.8478 202.00 197.00 5.00 309291 CRZ 2010 10 26 12 24 00 2654-99 P co CCGG 69.700 -999.990 ... V2 2010 12 20 14 47 00 -46.4337 51.8478 202.00 197.00 5.00 309292 CRZ 2010 11 03 10 41 00 4473-99 P co CCGG 66.080 -999.990 ... V2 2011 04 12 10 32 00 -46.4337 51.8478 202.00 197.00 5.00 315665 CRZ 2010 11 03 10 41 00 4474-99 P co CCGG 66.090 -999.990 ... V2 2011 04 12 10 49 00 -46.4337 51.8478 202.00 197.00 5.00 315666 CRZ 2010 11 08 10 51 00 245-99 P co CCGG 66.430 -999.990 ... V4 2011 04 12 13 13 00 -46.4337 51.8478 202.00 197.00 5.00 315625 CRZ 2010 11 08 10 51 00 246-99 P co CCGG 66.620 -999.990 ... V4 2011 04 12 13 29 00 -46.4337 51.8478 202.00 197.00 5.00 315626 CRZ 2010 11 16 06 55 00 3593-99 P co CCGG 64.730 -999.990 ... V4 2011 04 12 11 36 00 -46.4337 51.8478 202.00 197.00 5.00 315663 CRZ 2010 11 16 06 55 00 3594-99 P co CCGG 64.810 -999.990 ... V4 2011 04 12 11 51 00 -46.4337 51.8478 202.00 197.00 5.00 315664 CRZ 2010 11 26 07 03 00 43-99 P co CCGG 63.710 -999.990 ... V4 2011 04 12 11 05 00 -46.4337 51.8478 202.00 197.00 5.00 315661 CRZ 2010 11 26 07 03 00 44-99 P co CCGG 63.190 -999.990 ... V4 2011 04 12 11 21 00 -46.4337 51.8478 202.00 197.00 5.00 315662 CRZ 2010 11 29 11 52 00 2705-99 P co CCGG 65.500 -999.990 ... V2 2011 04 13 10 09 00 -46.4337 51.8478 202.00 197.00 5.00 315623 CRZ 2010 11 29 11 52 00 2706-99 P co CCGG 64.470 -999.990 ... V2 2011 04 13 10 25 00 -46.4337 51.8478 202.00 197.00 5.00 315624 CRZ 2010 12 10 07 31 00 3333-99 P co CCGG 61.580 -999.990 ... V4 2011 04 12 10 35 00 -46.4337 51.8478 202.00 197.00 5.00 315659 CRZ 2010 12 10 07 31 00 3334-99 P co CCGG 61.810 -999.990 ... V4 2011 04 12 10 50 00 -46.4337 51.8478 202.00 197.00 5.00 315660 CRZ 2010 12 14 12 08 00 2273-99 P co CCGG 55.320 -999.990 ... V2 2011 04 13 09 37 00 -46.4337 51.8478 202.00 197.00 5.00 315621 CRZ 2010 12 14 12 08 00 2274-99 P co CCGG 54.700 -999.990 ... V2 2011 04 13 09 53 00 -46.4337 51.8478 202.00 197.00 5.00 315622 CRZ 2010 12 21 07 11 00 3855-99 P co CCGG 56.290 -999.990 ... V4 2011 04 12 13 44 00 -46.4337 51.8478 202.00 197.00 5.00 315619 CRZ 2010 12 21 07 11 00 3856-99 P co CCGG 55.220 -999.990 ... V4 2011 04 12 13 59 00 -46.4337 51.8478 202.00 197.00 5.00 315620 CRZ 2010 12 30 05 28 00 1759-99 P co CCGG 53.060 -999.990 ... V4 2011 04 08 14 42 00 -46.4337 51.8478 202.00 197.00 5.00 315594 CRZ 2010 12 30 05 28 00 312-99 P co CCGG 53.600 -999.990 ... V4 2011 04 08 14 57 00 -46.4337 51.8478 202.00 197.00 5.00 315595 CRZ 2011 01 07 12 08 00 1081-99 P co CCGG 49.800 -999.990 ... V4 2011 04 08 15 27 00 -46.4337 51.8478 202.00 197.00 5.00 315597 CRZ 2011 01 07 12 08 00 1093-99 P co CCGG 48.850 -999.990 ... V4 2011 04 08 15 12 00 -46.4337 51.8478 202.00 197.00 5.00 315596 CRZ 2011 01 11 13 03 00 1347-99 P co CCGG 48.780 -999.990 ... V2 2011 04 11 13 04 00 -46.4337 51.8478 202.00 197.00 5.00 315598 CRZ 2011 01 11 13 03 00 1424-99 P co CCGG 48.660 -999.990 ... V2 2011 04 11 13 20 00 -46.4337 51.8478 202.00 197.00 5.00 315599 CRZ 2011 01 18 11 26 00 2464-99 P co CCGG 47.650 -999.990 ... V2 2011 04 11 15 31 00 -46.4337 51.8478 202.00 197.00 5.00 315605 CRZ 2011 01 18 11 26 00 3807-99 P co CCGG 48.010 -999.990 ... V2 2011 04 11 15 14 00 -46.4337 51.8478 202.00 197.00 5.00 315604 CRZ 2011 01 24 11 32 00 4105-99 P co CCGG 46.470 -999.990 ... V2 2011 04 11 13 53 00 -46.4337 51.8478 202.00 197.00 5.00 315601 CRZ 2011 01 24 11 32 00 4983-99 P co CCGG 46.070 -999.990 ... V2 2011 04 11 13 37 00 -46.4337 51.8478 202.00 197.00 5.00 315600 CRZ 2011 02 03 06 30 00 1419-99 P co CCGG 43.660 -999.990 ... V2 2011 04 11 16 03 00 -46.4337 51.8478 202.00 197.00 5.00 315603 CRZ 2011 02 03 06 30 00 1993-99 P co CCGG 44.480 -999.990 ... V2 2011 04 11 15 47 00 -46.4337 51.8478 202.00 197.00 5.00 315602 CRZ 2011 02 08 13 42 00 2846-99 P co CCGG 43.600 -999.990 ... V4 2011 04 11 14 19 00 -46.4337 51.8478 202.00 197.00 5.00 315607 CRZ 2011 02 08 13 42 00 581-99 P co CCGG 46.150 -999.990 ... V4 2011 04 11 14 04 00 -46.4337 51.8478 202.00 197.00 5.00 315606 CRZ 2011 02 15 06 10 00 3563-99 P co CCGG 43.270 -999.990 ... V2 2011 04 11 14 58 00 -46.4337 51.8478 202.00 197.00 5.00 315609 CRZ 2011 02 15 06 10 00 3725-99 P co CCGG 43.410 -999.990 ... V2 2011 04 11 14 42 00 -46.4337 51.8478 202.00 197.00 5.00 315608 CRZ 2011 02 25 11 24 00 155-99 P co CCGG 45.060 -999.990 ... V4 2012 01 19 14 00 00 -46.4337 51.8478 202.00 197.00 5.00 329384 CRZ 2011 02 25 11 24 00 1616-99 P co CCGG 43.330 -999.990 ... V4 2012 01 19 13 45 00 -46.4337 51.8478 202.00 197.00 5.00 329383 CRZ 2011 03 04 05 57 00 1842-99 P co CCGG 42.670 -999.990 ... V4 2012 01 18 14 13 00 -46.4337 51.8478 202.00 197.00 5.00 329382 CRZ 2011 03 04 05 57 00 2461-99 P co CCGG 42.150 -999.990 ... V4 2012 01 18 13 57 00 -46.4337 51.8478 202.00 197.00 5.00 329381 CRZ 2011 03 09 05 38 00 2348-99 P co CCGG 43.570 -999.990 ... V4 2012 01 20 10 10 00 -46.4337 51.8478 202.00 197.00 5.00 329388 CRZ 2011 03 09 05 38 00 4376-99 P co CCGG 43.170 -999.990 ... V4 2012 01 20 09 55 00 -46.4337 51.8478 202.00 197.00 5.00 329387 CRZ 2011 03 15 04 47 00 3834-99 P co CCGG 45.630 -999.990 ... V2 2012 01 19 16 15 00 -46.4337 51.8478 202.00 197.00 5.00 329386 CRZ 2011 03 15 04 47 00 4653-99 P co CCGG 43.360 -999.990 ... V2 2012 01 19 15 58 00 -46.4337 51.8478 202.00 197.00 5.00 329385 CRZ 2011 03 19 07 27 00 2732-99 P co CCGG 42.170 -999.990 ... V2 2012 01 17 12 28 00 -46.4337 51.8478 202.00 197.00 5.00 329408 CRZ 2011 03 19 07 27 00 4401-99 P co CCGG 41.770 -999.990 ... V2 2012 01 17 12 12 00 -46.4337 51.8478 202.00 197.00 5.00 329407 CRZ 2011 03 28 10 50 00 3345-99 P co CCGG 45.470 -999.990 ... V2 2012 01 17 11 56 00 -46.4337 51.8478 202.00 197.00 5.00 329410 CRZ 2011 03 28 10 50 00 4400-99 P co CCGG 43.370 -999.990 ... V2 2012 01 17 11 40 00 -46.4337 51.8478 202.00 197.00 5.00 329409 CRZ 2011 04 04 07 55 00 801-99 P co CCGG 44.470 -999.990 ... V2 2012 01 17 11 07 00 -46.4337 51.8478 202.00 197.00 5.00 329411 CRZ 2011 04 15 13 38 00 575-99 P co CCGG 45.630 -999.990 ... V4 2012 01 16 15 37 00 -46.4337 51.8478 202.00 197.00 5.00 329412 CRZ 2011 04 15 13 38 00 881-99 P co CCGG 45.990 -999.990 ... V4 2012 01 16 15 52 00 -46.4337 51.8478 202.00 197.00 5.00 329413 CRZ 2011 04 22 13 17 00 3836-99 P co CCGG 47.810 -999.990 ... V2 2012 01 18 09 56 00 -46.4337 51.8478 202.00 197.00 5.00 329389 CRZ 2011 04 22 13 17 00 5006-99 P co CCGG 46.440 -999.990 ... V2 2012 01 18 10 12 00 -46.4337 51.8478 202.00 197.00 5.00 329390 CRZ 2011 04 28 13 00 00 3232-99 P co CCGG 47.960 -999.990 ... V2 2012 01 13 15 02 00 -46.4337 51.8478 202.00 197.00 5.00 329404 CRZ 2011 04 28 13 00 00 4290-99 P co CCGG 47.820 -999.990 ... V2 2012 01 13 14 46 00 -46.4337 51.8478 202.00 197.00 5.00 329403 CRZ 2011 05 06 11 22 00 3231-99 P co CCGG 50.420 -999.990 ... V4 2012 01 13 15 43 00 -46.4337 51.8478 202.00 197.00 5.00 329402 CRZ 2011 05 06 11 22 00 4289-99 P co CCGG 48.670 -999.990 ... V4 2012 01 13 15 28 00 -46.4337 51.8478 202.00 197.00 5.00 329401 CRZ 2011 05 10 10 30 00 3835-99 P co CCGG 47.260 -999.990 ... V2 2012 01 18 09 40 00 -46.4337 51.8478 202.00 197.00 5.00 329392 CRZ 2011 05 10 10 30 00 5005-99 P co CCGG 46.800 -999.990 ... V2 2012 01 18 09 24 00 -46.4337 51.8478 202.00 197.00 5.00 329391 CRZ 2011 05 19 12 05 00 2622-99 P co CCGG 56.320 -999.990 ... V4 2012 01 18 13 27 00 -46.4337 51.8478 202.00 197.00 5.00 329393 CRZ 2011 05 19 12 05 00 4522-99 P co CCGG 56.190 -999.990 ... V4 2012 01 18 13 42 00 -46.4337 51.8478 202.00 197.00 5.00 329394 CRZ 2011 05 25 07 36 00 1936-99 P co CCGG 49.120 -999.990 ... V4 2012 01 13 15 13 00 -46.4337 51.8478 202.00 197.00 5.00 329400 CRZ 2011 05 25 07 36 00 462-99 P co CCGG 50.120 -999.990 ... V4 2012 01 13 14 58 00 -46.4337 51.8478 202.00 197.00 5.00 329399 CRZ 2011 06 01 10 23 00 1935-99 P co CCGG 48.740 -999.990 ... V4 2012 01 13 14 42 00 -46.4337 51.8478 202.00 197.00 5.00 329398 CRZ 2011 06 01 10 23 00 461-99 P co CCGG 48.840 -999.990 ... V4 2012 01 13 14 27 00 -46.4337 51.8478 202.00 197.00 5.00 329397 CRZ 2011 06 07 07 23 00 2621-99 P co CCGG 54.020 -999.990 ... V2 2012 01 18 10 45 00 -46.4337 51.8478 202.00 197.00 5.00 329396 CRZ 2011 06 07 07 23 00 4521-99 P co CCGG 52.520 -999.990 ... V2 2012 01 18 10 29 00 -46.4337 51.8478 202.00 197.00 5.00 329395 CRZ 2011 06 15 07 45 00 4014-99 P co CCGG 50.120 -999.990 ... V2 2012 01 17 13 01 00 -46.4337 51.8478 202.00 197.00 5.00 329376 CRZ 2011 06 15 07 45 00 4244-99 P co CCGG 49.660 -999.990 ... V2 2012 01 17 12 45 00 -46.4337 51.8478 202.00 197.00 5.00 329375 CRZ 2011 06 20 06 42 00 3909-99 P co CCGG 51.450 -999.990 ... V2 2012 01 17 14 06 00 -46.4337 51.8478 202.00 197.00 5.00 329378 CRZ 2011 06 20 06 42 00 4399-99 P co CCGG 50.000 -999.990 ... V2 2012 01 17 13 49 00 -46.4337 51.8478 202.00 197.00 5.00 329377 CRZ 2011 06 30 12 47 00 1533-99 P co CCGG 51.420 -999.990 ... V4 2012 01 17 09 51 00 -46.4337 51.8478 202.00 197.00 5.00 329366 CRZ 2011 06 30 12 47 00 2985-99 P co CCGG 51.130 -999.990 ... V4 2012 01 17 09 36 00 -46.4337 51.8478 202.00 197.00 5.00 329365 CRZ 2011 07 06 07 11 00 2125-99 P co CCGG 53.390 -999.990 ... V4 2012 01 17 13 59 00 -46.4337 51.8478 202.00 197.00 5.00 329380 CRZ 2011 07 06 07 11 00 797-99 P co CCGG 51.870 -999.990 ... V4 2012 01 17 13 44 00 -46.4337 51.8478 202.00 197.00 5.00 329379 CRZ 2011 07 13 12 04 00 1574-99 P co CCGG 58.590 -999.990 ... V4 2012 01 17 10 07 00 -46.4337 51.8478 202.00 197.00 5.00 329367 CRZ 2011 07 13 12 04 00 2513-99 P co CCGG 56.040 -999.990 ... V4 2012 01 17 10 22 00 -46.4337 51.8478 202.00 197.00 5.00 329368 CRZ 2011 07 19 10 20 00 2778-99 P co CCGG 55.840 -999.990 ... V2 2012 01 17 13 33 00 -46.4337 51.8478 202.00 197.00 5.00 329374 CRZ 2011 07 19 10 20 00 2790-99 P co CCGG 55.360 -999.990 ... V2 2012 01 17 13 17 00 -46.4337 51.8478 202.00 197.00 5.00 329373 CRZ 2011 08 01 10 41 00 1335-99 P co CCGG 55.550 -999.990 ... V4 2012 01 17 10 37 00 -46.4337 51.8478 202.00 197.00 5.00 329369 CRZ 2011 08 01 10 41 00 4247-99 P co CCGG 54.820 -999.990 ... V4 2012 01 17 10 52 00 -46.4337 51.8478 202.00 197.00 5.00 329370 CRZ 2011 08 07 06 20 00 4553-99 P co CCGG 56.530 -999.990 ... V4 2012 01 17 11 26 00 -46.4337 51.8478 202.00 197.00 5.00 329372 CRZ 2011 08 07 06 20 00 576-99 P co CCGG 56.960 -999.990 ... V4 2012 01 17 11 11 00 -46.4337 51.8478 202.00 197.00 5.00 329371 CRZ 2011 08 14 06 35 00 3799-99 P co CCGG 60.450 -999.990 ... V4 2012 01 16 14 06 00 -46.4337 51.8478 202.00 197.00 5.00 329430 CRZ 2011 08 14 06 35 00 3800-99 P co CCGG 59.440 -999.990 ... V4 2012 01 16 14 21 00 -46.4337 51.8478 202.00 197.00 5.00 329431 CRZ 2011 08 22 10 29 00 285-99 P co CCGG 59.730 -999.990 ... V4 2012 01 16 14 36 00 -46.4337 51.8478 202.00 197.00 5.00 329432 CRZ 2011 08 22 10 29 00 286-99 P co CCGG 59.440 -999.990 ... V4 2012 01 16 14 51 00 -46.4337 51.8478 202.00 197.00 5.00 329433 CRZ 2011 09 01 06 31 00 1235-99 P co CCGG 62.840 -999.990 P.. V4 2012 01 16 15 07 00 -46.4337 51.8478 202.00 197.00 5.00 329434 CRZ 2011 09 01 06 31 00 1236-99 P co CCGG 65.820 -999.990 P.. V4 2012 01 16 15 22 00 -46.4337 51.8478 202.00 197.00 5.00 329435 CRZ 2011 09 05 10 59 00 2113-99 P co CCGG 60.200 -999.990 ... V2 2012 01 18 15 53 00 -46.4337 51.8478 202.00 197.00 5.00 329421 CRZ 2011 09 05 10 59 00 2114-99 P co CCGG 59.860 -999.990 ... V2 2012 01 18 16 09 00 -46.4337 51.8478 202.00 197.00 5.00 329420 CRZ 2011 09 13 10 44 00 4253-99 P co CCGG 61.320 -999.990 ... V4 2012 01 19 10 41 00 -46.4337 51.8478 202.00 197.00 5.00 329424 CRZ 2011 09 13 10 44 00 4254-99 P co CCGG 61.140 -999.990 ... V4 2012 01 19 10 56 00 -46.4337 51.8478 202.00 197.00 5.00 329425 CRZ 2011 09 23 12 52 00 1773-99 P co CCGG 64.250 -999.990 ... V2 2012 01 18 16 26 00 -46.4337 51.8478 202.00 197.00 5.00 329422 CRZ 2011 09 23 12 52 00 1774-99 P co CCGG 63.230 -999.990 ... V2 2012 01 18 16 42 00 -46.4337 51.8478 202.00 197.00 5.00 329423 CRZ 2011 09 29 12 47 00 3245-99 P co CCGG 60.970 -999.990 ... V4 2012 01 19 11 11 00 -46.4337 51.8478 202.00 197.00 5.00 329426 CRZ 2011 09 29 12 47 00 3246-99 P co CCGG 60.710 -999.990 ... V4 2012 01 19 11 27 00 -46.4337 51.8478 202.00 197.00 5.00 329427 CRZ 2011 10 08 07 28 00 2295-99 P co CCGG 63.010 -999.990 ... V4 2012 01 17 13 13 00 -46.4337 51.8478 202.00 197.00 5.00 329492 CRZ 2011 10 08 07 28 00 2296-99 P co CCGG 62.460 -999.990 ... V4 2012 01 17 13 29 00 -46.4337 51.8478 202.00 197.00 5.00 329493 CRZ 2011 10 12 12 14 00 4963-99 P co CCGG 60.640 -999.990 ... V4 2012 01 16 13 35 00 -46.4337 51.8478 202.00 197.00 5.00 329428 CRZ 2011 10 12 12 14 00 4964-99 P co CCGG 61.210 -999.990 ... V4 2012 01 16 13 50 00 -46.4337 51.8478 202.00 197.00 5.00 329429 CRZ 2011 10 17 06 24 00 441-99 P co CCGG 61.890 -999.990 ... V4 2012 01 17 12 42 00 -46.4337 51.8478 202.00 197.00 5.00 329490 CRZ 2011 10 17 06 24 00 442-99 P co CCGG 61.920 -999.990 ... V4 2012 01 17 12 57 00 -46.4337 51.8478 202.00 197.00 5.00 329491 CRZ 2011 10 23 11 49 00 4175-99 P co CCGG 59.920 -999.990 ... V4 2012 01 17 12 12 00 -46.4337 51.8478 202.00 197.00 5.00 329488 CRZ 2011 10 23 11 49 00 4176-99 P co CCGG 60.010 -999.990 ... V4 2012 01 17 12 27 00 -46.4337 51.8478 202.00 197.00 5.00 329489 CRZ 2011 10 31 14 24 00 3467-99 P co CCGG 61.340 -999.990 ... V4 2012 01 17 11 41 00 -46.4337 51.8478 202.00 197.00 5.00 329486 CRZ 2011 10 31 14 24 00 3468-99 P co CCGG 61.240 -999.990 ... V4 2012 01 17 11 56 00 -46.4337 51.8478 202.00 197.00 5.00 329487 CRZ 2011 11 08 05 16 00 1783-99 P co CCGG 64.180 -999.990 ... V4 2012 01 19 12 44 00 -46.4337 51.8478 202.00 197.00 5.00 329508 CRZ 2011 11 08 05 16 00 1784-99 P co CCGG 63.390 -999.990 ... V4 2012 01 19 12 59 00 -46.4337 51.8478 202.00 197.00 5.00 329509 CRZ 2011 11 28 06 50 00 5117-99 P co CCGG 51.890 -999.990 ... V4 2012 01 19 13 15 00 -46.4337 51.8478 202.00 197.00 5.00 329506 CRZ 2011 11 28 06 50 00 5118-99 P co CCGG 52.070 -999.990 ... V4 2012 01 19 13 30 00 -46.4337 51.8478 202.00 197.00 5.00 329507 CRZ 2011 12 02 05 58 00 5039-99 P co CCGG 52.750 -999.990 -.. V2 2012 01 31 15 19 00 -46.4337 51.8478 202.00 197.00 5.00 330253 CRZ 2011 12 02 05 58 00 5040-99 P co CCGG 99.370 -999.990 +.. V2 2012 01 31 15 35 00 -46.4337 51.8478 202.00 197.00 5.00 330254 CRZ 2011 12 12 13 29 00 3355-99 P co CCGG 49.180 -999.990 ... V4 2012 04 30 16 07 00 -46.4337 51.8478 202.00 197.00 5.00 334464 CRZ 2011 12 12 13 29 00 3356-99 P co CCGG 50.640 -999.990 ... V4 2012 04 30 16 22 00 -46.4337 51.8478 202.00 197.00 5.00 334465 CRZ 2011 12 19 15 30 00 1609-99 P co CCGG 49.610 -999.990 ... V4 2012 05 03 15 12 00 -46.4337 51.8478 202.00 197.00 5.00 334472 CRZ 2011 12 19 15 30 00 1610-99 P co CCGG 49.570 -999.990 ... V4 2012 05 03 15 27 00 -46.4337 51.8478 202.00 197.00 5.00 334473 CRZ 2011 12 26 07 00 00 629-99 P co CCGG 49.000 -999.990 ... V4 2012 04 30 14 02 00 -46.4337 51.8478 202.00 197.00 5.00 334466 CRZ 2011 12 26 07 00 00 630-99 P co CCGG 49.020 -999.990 ... V4 2012 04 30 14 17 00 -46.4337 51.8478 202.00 197.00 5.00 334467 CRZ 2012 01 02 13 21 00 3157-99 P co CCGG 46.590 -999.990 ... V4 2012 05 03 15 43 00 -46.4337 51.8478 202.00 197.00 5.00 334474 CRZ 2012 01 02 13 21 00 3158-99 P co CCGG 47.940 -999.990 ... V4 2012 05 03 15 58 00 -46.4337 51.8478 202.00 197.00 5.00 334475 CRZ 2012 01 09 14 18 00 1543-99 P co CCGG 45.700 -999.990 ... V4 2012 04 30 13 31 00 -46.4337 51.8478 202.00 197.00 5.00 334470 CRZ 2012 01 09 14 18 00 1544-99 P co CCGG 43.950 -999.990 ... V4 2012 04 30 13 46 00 -46.4337 51.8478 202.00 197.00 5.00 334471 CRZ 2012 01 16 14 35 00 3781-99 P co CCGG 43.760 -999.990 ... V4 2012 05 03 16 13 00 -46.4337 51.8478 202.00 197.00 5.00 334476 CRZ 2012 01 16 14 35 00 3782-99 P co CCGG 43.030 -999.990 ... V4 2012 05 03 16 28 00 -46.4337 51.8478 202.00 197.00 5.00 334477 CRZ 2012 01 23 07 08 00 195-99 P co CCGG 44.520 -999.990 ... V4 2012 04 30 13 00 00 -46.4337 51.8478 202.00 197.00 5.00 334468 CRZ 2012 01 23 07 08 00 196-99 P co CCGG 44.310 -999.990 ... V4 2012 04 30 13 16 00 -46.4337 51.8478 202.00 197.00 5.00 334469 CRZ 2012 01 30 14 05 00 1225-99 P co CCGG 42.700 -999.990 ... V4 2012 05 04 09 26 00 -46.4337 51.8478 202.00 197.00 5.00 334478 CRZ 2012 01 30 14 05 00 1226-99 P co CCGG 42.430 -999.990 ... V4 2012 05 04 09 41 00 -46.4337 51.8478 202.00 197.00 5.00 334479 CRZ 2012 02 06 12 27 00 4215-99 P co CCGG 43.030 -999.990 ... V4 2012 10 23 10 50 00 -46.4337 51.8478 202.00 197.00 5.00 342547 CRZ 2012 02 06 12 27 00 5147-99 P co CCGG 42.940 -999.990 ... V4 2012 10 23 10 35 00 -46.4337 51.8478 202.00 197.00 5.00 342546 CRZ 2012 02 20 15 00 00 2586-99 P co CCGG 41.070 -999.990 ... V4 2012 10 23 11 05 00 -46.4337 51.8478 202.00 197.00 5.00 342548 CRZ 2012 02 20 15 00 00 3740-99 P co CCGG 40.830 -999.990 ... V4 2012 10 23 11 21 00 -46.4337 51.8478 202.00 197.00 5.00 342549 CRZ 2012 02 27 12 00 00 1366-99 P co CCGG 41.880 -999.990 ... V4 2012 10 23 11 51 00 -46.4337 51.8478 202.00 197.00 5.00 342551 CRZ 2012 02 27 12 00 00 2745-99 P co CCGG 43.220 -999.990 ... V4 2012 10 23 11 36 00 -46.4337 51.8478 202.00 197.00 5.00 342550 CRZ 2012 03 05 13 11 00 1914-99 P co CCGG 47.230 -999.990 +.. V4 2012 10 23 12 06 00 -46.4337 51.8478 202.00 197.00 5.00 342552 CRZ 2012 03 05 13 11 00 4606-99 P co CCGG 43.860 -999.990 -.. V4 2012 10 23 12 22 00 -46.4337 51.8478 202.00 197.00 5.00 342553 CRZ 2012 03 12 13 21 00 317-99 P co CCGG 44.050 -999.990 ... V4 2012 10 24 12 33 00 -46.4337 51.8478 202.00 197.00 5.00 342554 CRZ 2012 03 12 13 21 00 4511-99 P co CCGG 41.410 -999.990 ... V4 2012 10 24 12 48 00 -46.4337 51.8478 202.00 197.00 5.00 342555 CRZ 2012 03 19 14 34 00 3254-99 P co CCGG 42.000 -999.990 ... V4 2012 10 24 13 18 00 -46.4337 51.8478 202.00 197.00 5.00 342557 CRZ 2012 03 19 14 34 00 35-99 P co CCGG 42.530 -999.990 ... V4 2012 10 24 13 03 00 -46.4337 51.8478 202.00 197.00 5.00 342556 CRZ 2012 03 26 14 28 00 2383-99 P co CCGG 43.480 -999.990 ... V4 2012 10 24 13 34 00 -46.4337 51.8478 202.00 197.00 5.00 342558 CRZ 2012 03 26 14 28 00 2614-99 P co CCGG 44.830 -999.990 ... V4 2012 10 24 13 49 00 -46.4337 51.8478 202.00 197.00 5.00 342559 CRZ 2012 04 12 12 22 00 1450-99 P co CCGG 43.780 -999.990 ... V4 2012 10 24 14 04 00 -46.4337 51.8478 202.00 197.00 5.00 342560 CRZ 2012 04 12 12 22 00 5267-99 P co CCGG 43.040 -999.990 ... V4 2012 10 24 14 19 00 -46.4337 51.8478 202.00 197.00 5.00 342561 CRZ 2012 04 17 13 35 00 1924-99 P co CCGG 46.390 -999.990 ... V4 2012 10 22 12 49 00 -46.4337 51.8478 202.00 197.00 5.00 342580 CRZ 2012 04 17 13 35 00 4314-99 P co CCGG 44.350 -999.990 ... V4 2012 10 22 13 04 00 -46.4337 51.8478 202.00 197.00 5.00 342581 CRZ 2012 04 25 10 36 00 2623-99 P co CCGG 47.010 -999.990 ... V4 2012 10 22 11 32 00 -46.4337 51.8478 202.00 197.00 5.00 342579 CRZ 2012 04 25 10 36 00 818-99 P co CCGG 48.770 -999.990 ... V4 2012 10 22 11 17 00 -46.4337 51.8478 202.00 197.00 5.00 342578 CRZ 2012 05 03 11 23 00 1974-99 P co CCGG 47.530 -999.990 ... V4 2012 10 22 12 03 00 -46.4337 51.8478 202.00 197.00 5.00 342585 CRZ 2012 05 03 11 23 00 4358-99 P co CCGG 46.840 -999.990 ... V4 2012 10 22 11 48 00 -46.4337 51.8478 202.00 197.00 5.00 342584 CRZ 2012 05 09 13 39 00 1442-99 P co CCGG 46.500 -999.990 ... V4 2012 10 22 12 18 00 -46.4337 51.8478 202.00 197.00 5.00 342582 CRZ 2012 05 09 13 39 00 4713-99 P co CCGG 1.290 -999.990 I.. V4 2012 10 22 12 33 00 -46.4337 51.8478 202.00 197.00 5.00 342583 CRZ 2012 05 09 13 39 00 4713-99 P co CCGG 46.730 -999.990 ... V4 2012 10 22 14 51 00 -46.4337 51.8478 202.00 197.00 5.00 342583 CRZ 2012 05 17 08 10 00 3496-99 P co CCGG 54.680 -999.990 ... V4 2012 10 23 14 39 00 -46.4337 51.8478 202.00 197.00 5.00 342586 CRZ 2012 05 17 08 10 00 4166-99 P co CCGG 52.870 -999.990 ... V4 2012 10 23 14 54 00 -46.4337 51.8478 202.00 197.00 5.00 342587 CRZ 2012 05 24 13 31 00 2793-99 P co CCGG 48.830 -999.990 ... V4 2012 10 23 15 09 00 -46.4337 51.8478 202.00 197.00 5.00 342588 CRZ 2012 05 24 13 31 00 3038-99 P co CCGG 48.510 -999.990 ... V4 2012 10 23 15 25 00 -46.4337 51.8478 202.00 197.00 5.00 342589 CRZ 2012 05 31 15 20 00 2006-99 P co CCGG 48.900 -999.990 ... V4 2012 10 23 16 00 00 -46.4337 51.8478 202.00 197.00 5.00 342591 CRZ 2012 05 31 15 20 00 522-99 P co CCGG 49.630 -999.990 ... V4 2012 10 23 15 45 00 -46.4337 51.8478 202.00 197.00 5.00 342590 CRZ 2012 06 07 14 00 00 2358-99 P co CCGG 49.700 -999.990 ... V4 2012 10 23 16 30 00 -46.4337 51.8478 202.00 197.00 5.00 342593 CRZ 2012 06 07 14 00 00 4218-99 P co CCGG 49.480 -999.990 ... V4 2012 10 23 16 15 00 -46.4337 51.8478 202.00 197.00 5.00 342592 CRZ 2012 06 15 15 01 00 1303-99 P co CCGG 50.920 -999.990 ... V4 2012 10 24 15 36 00 -46.4337 51.8478 202.00 197.00 5.00 342566 CRZ 2012 06 15 15 01 00 1304-99 P co CCGG 51.100 -999.990 ... V4 2012 10 24 15 51 00 -46.4337 51.8478 202.00 197.00 5.00 342567 CRZ 2012 06 23 09 42 00 2257-99 P co CCGG 52.290 -999.990 ... V4 2012 10 24 14 35 00 -46.4337 51.8478 202.00 197.00 5.00 342562 CRZ 2012 06 23 09 42 00 2258-99 P co CCGG 52.390 -999.990 ... V4 2012 10 24 14 50 00 -46.4337 51.8478 202.00 197.00 5.00 342563 CRZ 2012 06 30 13 53 00 1359-99 P co CCGG 53.970 -999.990 ... V4 2012 10 24 16 06 00 -46.4337 51.8478 202.00 197.00 5.00 342568 CRZ 2012 06 30 13 53 00 1360-99 P co CCGG 55.220 -999.990 ... V4 2012 10 24 16 21 00 -46.4337 51.8478 202.00 197.00 5.00 342569 CRZ 2012 07 08 11 36 00 3829-99 P co CCGG 58.810 -999.990 ... V4 2012 10 24 15 05 00 -46.4337 51.8478 202.00 197.00 5.00 342564 CRZ 2012 07 08 11 36 00 3830-99 P co CCGG 59.280 -999.990 ... V4 2012 10 24 15 20 00 -46.4337 51.8478 202.00 197.00 5.00 342565 CRZ 2012 07 16 13 47 00 143-99 P co CCGG 55.050 -999.990 ... V4 2012 10 17 15 49 00 -46.4337 51.8478 202.00 197.00 5.00 342570 CRZ 2012 07 16 13 47 00 144-99 P co CCGG 54.910 -999.990 ... V4 2012 10 17 16 04 00 -46.4337 51.8478 202.00 197.00 5.00 342571 CRZ 2012 07 25 12 43 00 3023-99 P co CCGG 57.550 -999.990 ... V4 2012 10 18 09 28 00 -46.4337 51.8478 202.00 197.00 5.00 342572 CRZ 2012 07 25 12 43 00 3024-99 P co CCGG 57.750 -999.990 ... V4 2012 10 18 09 43 00 -46.4337 51.8478 202.00 197.00 5.00 342573 CRZ 2012 08 03 11 31 00 717-99 P co CCGG 58.530 -999.990 ... V4 2012 10 18 10 29 00 -46.4337 51.8478 202.00 197.00 5.00 342574 CRZ 2012 08 03 11 31 00 718-99 P co CCGG 57.120 -999.990 ... V4 2012 10 18 10 44 00 -46.4337 51.8478 202.00 197.00 5.00 342575 CRZ 2012 08 09 12 33 00 2725-99 P co CCGG 58.750 -999.990 ... V4 2012 10 18 09 59 00 -46.4337 51.8478 202.00 197.00 5.00 342576 CRZ 2012 08 09 12 33 00 2726-99 P co CCGG 58.780 -999.990 ... V4 2012 10 18 10 14 00 -46.4337 51.8478 202.00 197.00 5.00 342577 CRZ 2012 08 16 14 25 00 1274-99 P co CCGG 64.190 -999.990 +.. V4 2013 05 01 12 30 00 -46.4337 51.8478 202.00 197.00 5.00 350643 CRZ 2012 08 16 14 25 00 5144-99 P co CCGG 60.940 -999.990 -.. V4 2013 05 01 12 14 00 -46.4337 51.8478 202.00 197.00 5.00 350642 CRZ 2012 08 22 08 15 00 249-99 P co CCGG 59.620 -999.990 ... V4 2013 04 30 12 53 00 -46.4337 51.8478 202.00 197.00 5.00 350611 CRZ 2012 08 22 08 15 00 2660-99 P co CCGG 59.350 -999.990 ... V4 2013 04 30 12 37 00 -46.4337 51.8478 202.00 197.00 5.00 350610 CRZ 2012 08 30 13 55 00 4143-99 P co CCGG 61.010 -999.990 ... V4 2013 05 01 13 02 00 -46.4337 51.8478 202.00 197.00 5.00 350645 CRZ 2012 08 30 13 55 00 925-99 P co CCGG 60.420 -999.990 ... V4 2013 05 01 12 46 00 -46.4337 51.8478 202.00 197.00 5.00 350644 CRZ 2012 09 06 13 29 00 2100-99 P co CCGG 60.820 -999.990 ... V4 2013 04 30 15 52 00 -46.4337 51.8478 202.00 197.00 5.00 350612 CRZ 2012 09 06 13 29 00 668-99 P co CCGG 60.630 -999.990 ... V4 2013 04 30 16 08 00 -46.4337 51.8478 202.00 197.00 5.00 350613 CRZ 2012 09 20 13 22 00 1093-99 P co CCGG 59.590 -999.990 ... V4 2013 05 01 13 34 00 -46.4337 51.8478 202.00 197.00 5.00 350647 CRZ 2012 09 20 13 22 00 3812-99 P co CCGG 60.800 -999.990 ... V4 2013 05 01 13 18 00 -46.4337 51.8478 202.00 197.00 5.00 350646 CRZ 2012 09 27 15 25 00 349-99 P co CCGG 61.760 -999.990 ... V4 2013 04 30 16 24 00 -46.4337 51.8478 202.00 197.00 5.00 350614 CRZ 2012 09 27 15 25 00 955-99 P co CCGG 61.840 -999.990 ... V4 2013 04 30 16 40 00 -46.4337 51.8478 202.00 197.00 5.00 350615 CRZ 2012 10 04 13 12 00 4371-99 P co CCGG 68.120 -999.990 ... V4 2013 05 01 13 50 00 -46.4337 51.8478 202.00 197.00 5.00 350648 CRZ 2012 10 04 13 12 00 5205-99 P co CCGG 68.340 -999.990 ... V4 2013 05 01 14 06 00 -46.4337 51.8478 202.00 197.00 5.00 350649 CRZ 2012 10 12 11 07 00 1837-99 P co CCGG 61.730 -999.990 ... V4 2013 05 01 09 50 00 -46.4337 51.8478 202.00 197.00 5.00 350617 CRZ 2012 10 12 11 07 00 5204-99 P co CCGG 61.720 -999.990 ... V4 2013 05 01 09 34 00 -46.4337 51.8478 202.00 197.00 5.00 350616 CRZ 2012 12 11 11 40 00 4014-99 P co CCGG 51.630 -999.990 -.. V4 2013 05 07 12 59 00 -46.4337 51.8478 202.00 197.00 5.00 350969 CRZ 2012 12 11 11 40 00 4131-99 P co CCGG 61.650 -999.990 +.. V4 2013 05 07 12 43 00 -46.4337 51.8478 202.00 197.00 5.00 350970 CRZ 2012 12 18 10 29 00 2790-99 P co CCGG 50.760 -999.990 ... V4 2013 05 06 11 54 00 -46.4337 51.8478 202.00 197.00 5.00 350967 CRZ 2012 12 18 10 29 00 4244-99 P co CCGG 50.760 -999.990 ... V4 2013 05 06 12 10 00 -46.4337 51.8478 202.00 197.00 5.00 350968 CRZ 2012 12 24 13 00 00 2583-99 P co CCGG 49.700 -999.990 ... V4 2013 05 02 14 02 00 -46.4337 51.8478 202.00 197.00 5.00 350953 CRZ 2012 12 24 13 00 00 4746-99 P co CCGG 49.920 -999.990 ... V4 2013 05 02 14 18 00 -46.4337 51.8478 202.00 197.00 5.00 350954 CRZ 2012 12 31 10 45 00 2472-99 P co CCGG 47.720 -999.990 ... V4 2013 05 06 10 24 00 -46.4337 51.8478 202.00 197.00 5.00 350952 CRZ 2012 12 31 10 45 00 4737-99 P co CCGG 48.040 -999.990 ... V4 2013 05 06 10 08 00 -46.4337 51.8478 202.00 197.00 5.00 350951 CRZ 2013 01 05 13 09 00 4294-99 P co CCGG 45.590 -999.990 ... V4 2013 04 29 12 02 00 -46.4337 51.8478 202.00 197.00 5.00 350945 CRZ 2013 01 05 13 09 00 797-99 P co CCGG 45.310 -999.990 ... V4 2013 04 29 12 18 00 -46.4337 51.8478 202.00 197.00 5.00 350946 CRZ 2013 01 13 11 00 00 3107-99 P co CCGG 42.680 -999.990 ... V4 2013 04 29 11 30 00 -46.4337 51.8478 202.00 197.00 5.00 350943 CRZ 2013 01 13 11 00 00 3902-99 P co CCGG 42.690 -999.990 ... V4 2013 04 29 11 46 00 -46.4337 51.8478 202.00 197.00 5.00 350944 CRZ 2013 01 19 15 34 00 2125-99 P co CCGG 44.290 -999.990 ... V4 2013 04 29 13 22 00 -46.4337 51.8478 202.00 197.00 5.00 350950 CRZ 2013 01 19 15 34 00 3652-99 P co CCGG 42.520 -999.990 ... V4 2013 04 29 13 06 00 -46.4337 51.8478 202.00 197.00 5.00 350949 CRZ 2013 01 24 10 13 00 1267-99 P co CCGG 43.250 -999.990 ... V4 2013 04 29 12 50 00 -46.4337 51.8478 202.00 197.00 5.00 350948 CRZ 2013 01 24 10 13 00 5099-99 P co CCGG 42.690 -999.990 ... V4 2013 04 29 12 34 00 -46.4337 51.8478 202.00 197.00 5.00 350947 CRZ 2013 02 01 08 03 00 3719-99 P co CCGG 44.440 -999.990 ... V4 2013 11 01 11 28 00 -46.4337 51.8478 202.00 197.00 5.00 358762 CRZ 2013 02 01 08 03 00 3720-99 P co CCGG 44.230 -999.990 ... V4 2013 11 01 11 44 00 -46.4337 51.8478 202.00 197.00 5.00 358763 CRZ 2013 02 16 11 58 00 2705-99 P co CCGG 43.260 -999.990 ... V4 2013 11 04 12 45 00 -46.4337 51.8478 202.00 197.00 5.00 358758 CRZ 2013 02 16 11 58 00 2706-99 P co CCGG 43.090 -999.990 ... V4 2013 11 04 13 01 00 -46.4337 51.8478 202.00 197.00 5.00 358759 CRZ 2013 03 02 11 50 00 4729-99 P co CCGG 42.420 -999.990 ... V4 2013 11 01 12 00 00 -46.4337 51.8478 202.00 197.00 5.00 358764 CRZ 2013 03 02 11 50 00 4730-99 P co CCGG 42.580 -999.990 ... V4 2013 11 01 12 16 00 -46.4337 51.8478 202.00 197.00 5.00 358765 CRZ 2013 03 10 11 20 00 5315-99 P co CCGG 41.670 -999.990 ... V4 2013 11 04 13 17 00 -46.4337 51.8478 202.00 197.00 5.00 358760 CRZ 2013 03 10 11 20 00 5316-99 P co CCGG 41.260 -999.990 ... V4 2013 11 04 13 33 00 -46.4337 51.8478 202.00 197.00 5.00 358761 CRZ 2013 03 23 12 30 00 1725-99 P co CCGG 44.250 -999.990 ... V4 2013 11 01 12 48 00 -46.4337 51.8478 202.00 197.00 5.00 358767 CRZ 2013 03 23 12 30 00 3937-99 P co CCGG 42.450 -999.990 ... V4 2013 11 01 12 32 00 -46.4337 51.8478 202.00 197.00 5.00 358766 CRZ 2013 04 05 12 59 00 2081-99 P co CCGG 42.830 -999.990 ... V4 2013 11 01 13 04 00 -46.4337 51.8478 202.00 197.00 5.00 358768 CRZ 2013 04 05 12 59 00 2082-99 P co CCGG 42.540 -999.990 ... V4 2013 11 01 13 20 00 -46.4337 51.8478 202.00 197.00 5.00 358769 CRZ 2013 04 12 13 25 00 2961-99 P co CCGG 43.480 -999.990 ... V4 2013 11 04 12 13 00 -46.4337 51.8478 202.00 197.00 5.00 358756 CRZ 2013 04 12 13 25 00 2962-99 P co CCGG 44.220 -999.990 ... V4 2013 11 04 12 29 00 -46.4337 51.8478 202.00 197.00 5.00 358757 CRZ 2013 04 19 13 03 00 1016-99 P co CCGG 44.940 -999.990 ... V4 2013 11 05 13 15 00 -46.4337 51.8478 202.00 197.00 5.00 358778 CRZ 2013 04 19 13 03 00 4364-99 P co CCGG 44.540 -999.990 ... V4 2013 11 05 13 31 00 -46.4337 51.8478 202.00 197.00 5.00 358779 CRZ 2013 04 26 13 51 00 353-99 P co CCGG 68.960 -999.990 +.. V4 2013 11 05 13 47 00 -46.4337 51.8478 202.00 197.00 5.00 358780 CRZ 2013 04 26 13 51 00 3736-99 P co CCGG 46.560 -999.990 -.. V4 2013 11 05 14 03 00 -46.4337 51.8478 202.00 197.00 5.00 358781 CRZ 2013 05 05 10 58 00 2123-99 P co CCGG 47.030 -999.990 ... V4 2013 10 31 16 10 00 -46.4337 51.8478 202.00 197.00 5.00 358749 CRZ 2013 05 05 10 58 00 2707-99 P co CCGG 46.200 -999.990 ... V4 2013 10 31 15 54 00 -46.4337 51.8478 202.00 197.00 5.00 358748 CRZ 2013 05 09 13 25 00 3836-99 P co CCGG 48.570 -999.990 ... V4 2013 10 31 15 38 00 -46.4337 51.8478 202.00 197.00 5.00 358746 CRZ 2013 05 09 13 25 00 846-99 P co CCGG 48.860 -999.990 ... V4 2013 10 31 15 21 00 -46.4337 51.8478 202.00 197.00 5.00 358747 CRZ 2013 05 17 12 43 00 1432-99 P co CCGG 74.160 -999.990 .X. V4 2013 11 01 10 40 00 -46.4337 51.8478 202.00 197.00 5.00 358751 CRZ 2013 05 17 12 43 00 5006-99 P co CCGG 73.750 -999.990 .X. V4 2013 11 01 10 24 00 -46.4337 51.8478 202.00 197.00 5.00 358750 CRZ 2013 05 24 13 18 00 2348-99 P co CCGG 49.790 -999.990 ... V4 2013 11 01 10 56 00 -46.4337 51.8478 202.00 197.00 5.00 358752 CRZ 2013 05 24 13 18 00 364-99 P co CCGG 49.640 -999.990 ... V4 2013 11 01 11 12 00 -46.4337 51.8478 202.00 197.00 5.00 358753 CRZ 2013 05 31 12 30 00 1699-99 P co CCGG 50.090 -999.990 ... V4 2013 11 04 11 57 00 -46.4337 51.8478 202.00 197.00 5.00 358755 CRZ 2013 05 31 12 30 00 4376-99 P co CCGG 48.820 -999.990 ... V4 2013 11 04 11 41 00 -46.4337 51.8478 202.00 197.00 5.00 358754 CRZ 2013 06 07 12 37 00 4417-99 P co CCGG 53.190 -999.990 ... V4 2013 11 04 11 09 00 -46.4337 51.8478 202.00 197.00 5.00 358744 CRZ 2013 06 07 12 37 00 4418-99 P co CCGG 52.680 -999.990 ... V4 2013 11 04 11 25 00 -46.4337 51.8478 202.00 197.00 5.00 358745 CRZ 2013 06 16 11 38 00 1283-99 P co CCGG 51.130 -999.990 ... V4 2013 11 04 10 05 00 -46.4337 51.8478 202.00 197.00 5.00 358740 CRZ 2013 06 16 11 38 00 1284-99 P co CCGG 56.110 -999.990 N.. V4 2013 11 04 10 21 00 -46.4337 51.8478 202.00 197.00 5.00 358741 CRZ 2013 06 21 09 48 00 471-99 P co CCGG 52.830 -999.990 ... V4 2013 11 04 10 37 00 -46.4337 51.8478 202.00 197.00 5.00 358742 CRZ 2013 06 21 09 48 00 472-99 P co CCGG 53.170 -999.990 ... V4 2013 11 04 10 53 00 -46.4337 51.8478 202.00 197.00 5.00 358743 CRZ 2013 06 28 12 15 00 5173-99 P co CCGG 53.310 -999.990 ... V4 2013 11 04 09 33 00 -46.4337 51.8478 202.00 197.00 5.00 358738 CRZ 2013 06 28 12 15 00 5174-99 P co CCGG 53.390 -999.990 ... V4 2013 11 04 09 49 00 -46.4337 51.8478 202.00 197.00 5.00 358739 CRZ 2013 07 05 09 31 00 5253-99 P co CCGG 54.630 -999.990 ... V4 2013 11 05 12 43 00 -46.4337 51.8478 202.00 197.00 5.00 358776 CRZ 2013 07 05 09 31 00 5254-99 P co CCGG 54.580 -999.990 ... V4 2013 11 05 12 59 00 -46.4337 51.8478 202.00 197.00 5.00 358777 CRZ 2013 07 13 13 10 00 4523-99 P co CCGG 61.910 -999.990 ... V4 2013 11 04 14 53 00 -46.4337 51.8478 202.00 197.00 5.00 358770 CRZ 2013 07 13 13 10 00 4524-99 P co CCGG 61.470 -999.990 ... V4 2013 11 04 15 09 00 -46.4337 51.8478 202.00 197.00 5.00 358771 CRZ 2013 07 19 08 35 00 3081-99 P co CCGG 57.530 -999.990 ... V3 2013 11 05 13 50 00 -46.4337 51.8478 202.00 197.00 5.00 358772 CRZ 2013 07 19 08 35 00 3082-99 P co CCGG 58.330 -999.990 ... V3 2013 11 05 14 06 00 -46.4337 51.8478 202.00 197.00 5.00 358773 CRZ 2013 07 26 10 26 00 4385-99 P co CCGG 58.220 -999.990 ... V4 2013 11 05 12 11 00 -46.4337 51.8478 202.00 197.00 5.00 358774 CRZ 2013 07 26 10 26 00 4386-99 P co CCGG 58.730 -999.990 ... V4 2013 11 05 12 27 00 -46.4337 51.8478 202.00 197.00 5.00 358775 CRZ 2013 08 04 10 55 00 2265-99 P co CCGG 57.880 -999.990 ... V3 2014 02 04 11 51 00 -46.4337 51.8478 202.00 197.00 5.00 363148 CRZ 2013 08 04 10 55 00 4231-99 P co CCGG 57.560 -999.990 ... V3 2014 02 04 12 07 00 -46.4337 51.8478 202.00 197.00 5.00 363149 CRZ 2013 08 09 10 29 00 1613-99 P co CCGG 58.320 -999.990 ... V3 2014 02 04 12 23 00 -46.4337 51.8478 202.00 197.00 5.00 363150 CRZ 2013 08 09 10 29 00 4618-99 P co CCGG 57.750 -999.990 ... V3 2014 02 04 12 39 00 -46.4337 51.8478 202.00 197.00 5.00 363151 CRZ 2013 08 16 10 35 00 1588-99 P co CCGG 58.770 -999.990 ... V3 2014 02 04 12 56 00 -46.4337 51.8478 202.00 197.00 5.00 363152 CRZ 2013 08 16 10 35 00 3288-99 P co CCGG 58.280 -999.990 ... V3 2014 02 04 13 12 00 -46.4337 51.8478 202.00 197.00 5.00 363153 CRZ 2013 08 23 12 52 00 2811-99 P co CCGG 62.820 -999.990 ... V3 2014 02 10 10 53 00 -46.4337 51.8478 202.00 197.00 5.00 363154 CRZ 2013 08 23 12 52 00 3511-99 P co CCGG 60.260 -999.990 ... V3 2014 02 10 11 09 00 -46.4337 51.8478 202.00 197.00 5.00 363155 CRZ 2013 09 02 10 15 00 254-99 P co CCGG 63.250 -999.990 ... V3 2014 02 04 11 18 00 -46.4337 51.8478 202.00 197.00 5.00 363146 CRZ 2013 09 02 10 15 00 2835-99 P co CCGG 64.950 -999.990 ... V3 2014 02 04 11 35 00 -46.4337 51.8478 202.00 197.00 5.00 363147 CRZ 2013 09 07 10 03 00 3338-99 P co CCGG 59.770 -999.990 ... V4 2014 02 05 13 10 00 -46.4337 51.8478 202.00 197.00 5.00 363185 CRZ 2013 09 07 10 03 00 4314-99 P co CCGG 59.710 -999.990 ... V4 2014 02 05 12 54 00 -46.4337 51.8478 202.00 197.00 5.00 363184 CRZ 2013 09 13 11 29 00 3008-99 P co CCGG 59.820 -999.990 ... V3 2014 02 05 12 17 00 -46.4337 51.8478 202.00 197.00 5.00 363182 CRZ 2013 09 13 11 29 00 42-99 P co CCGG 60.030 -999.990 ... V3 2014 02 05 12 33 00 -46.4337 51.8478 202.00 197.00 5.00 363183 CRZ 2013 09 21 11 21 00 2515-99 P co CCGG 73.620 -999.990 .X. V3 2014 02 05 11 45 00 -46.4337 51.8478 202.00 197.00 5.00 363180 CRZ 2013 09 21 11 21 00 4229-99 P co CCGG 73.110 -999.990 .X. V3 2014 02 05 12 01 00 -46.4337 51.8478 202.00 197.00 5.00 363181 CRZ 2013 09 27 10 34 00 1168-99 P co CCGG 60.610 -999.990 ... V3 2014 02 10 11 58 00 -46.4337 51.8478 202.00 197.00 5.00 363156 CRZ 2013 09 27 10 34 00 358-99 P co CCGG 60.010 -999.990 ... V3 2014 02 10 12 14 00 -46.4337 51.8478 202.00 197.00 5.00 363157 CRZ 2013 10 04 07 09 00 1167-99 P co CCGG 59.580 -999.990 ... V3 2014 02 10 11 25 00 -46.4337 51.8478 202.00 197.00 5.00 363158 CRZ 2013 10 04 07 09 00 357-99 P co CCGG 61.020 -999.990 ... V3 2014 02 10 11 42 00 -46.4337 51.8478 202.00 197.00 5.00 363159 CRZ 2013 10 11 12 50 00 1184-99 P co CCGG 59.030 -999.990 ... V3 2014 02 04 14 00 00 -46.4337 51.8478 202.00 197.00 5.00 363129 CRZ 2013 10 11 12 50 00 5426-99 P co CCGG 58.480 -999.990 ... V3 2014 02 04 14 17 00 -46.4337 51.8478 202.00 197.00 5.00 363130 CRZ 2013 10 18 07 15 00 1183-99 P co CCGG 59.710 -999.990 ... V3 2014 02 04 13 28 00 -46.4337 51.8478 202.00 197.00 5.00 363131 CRZ 2013 10 18 07 15 00 5425-99 P co CCGG 59.150 -999.990 ... V3 2014 02 04 13 44 00 -46.4337 51.8478 202.00 197.00 5.00 363132 CRZ 2013 10 26 11 15 00 2225-99 P co CCGG 56.690 -999.990 ... V3 2014 02 04 15 05 00 -46.4337 51.8478 202.00 197.00 5.00 363133 CRZ 2013 10 26 11 15 00 2226-99 P co CCGG 57.400 -999.990 ... V3 2014 02 04 15 21 00 -46.4337 51.8478 202.00 197.00 5.00 363134 CRZ 2013 11 01 08 26 00 1979-99 P co CCGG 55.330 -999.990 ... V3 2014 02 04 14 33 00 -46.4337 51.8478 202.00 197.00 5.00 363135 CRZ 2013 11 01 08 26 00 1980-99 P co CCGG 57.460 -999.990 ... V3 2014 02 04 14 49 00 -46.4337 51.8478 202.00 197.00 5.00 363136 CRZ 2013 11 09 15 20 00 5391-99 P co CCGG 55.180 -999.990 ... V3 2014 02 10 12 30 00 -46.4337 51.8478 202.00 197.00 5.00 363160 CRZ 2013 11 09 15 20 00 5392-99 P co CCGG 55.010 -999.990 ... V3 2014 02 10 12 46 00 -46.4337 51.8478 202.00 197.00 5.00 363161 CRZ 2013 11 16 11 19 00 1987-99 P co CCGG 54.120 -999.990 ... V3 2014 02 05 14 59 00 -46.4337 51.8478 202.00 197.00 5.00 363190 CRZ 2013 11 16 11 19 00 1988-99 P co CCGG 53.050 -999.990 ... V3 2014 02 05 15 15 00 -46.4337 51.8478 202.00 197.00 5.00 363191 CRZ 2013 11 22 06 32 00 103-99 P co CCGG 53.070 -999.990 ... V4 2014 07 15 10 54 00 -46.4337 51.8478 202.00 197.00 5.00 370239 CRZ 2013 11 22 06 32 00 104-99 P co CCGG 53.290 -999.990 ... V4 2014 07 15 11 10 00 -46.4337 51.8478 202.00 197.00 5.00 370240 CRZ 2013 12 07 10 25 00 2427-99 P co CCGG 49.890 -999.990 ... V4 2014 07 15 10 22 00 -46.4337 51.8478 202.00 197.00 5.00 370235 CRZ 2013 12 07 10 25 00 2428-99 P co CCGG 50.370 -999.990 ... V4 2014 07 15 10 38 00 -46.4337 51.8478 202.00 197.00 5.00 370236 CRZ 2013 12 17 10 17 00 2577-99 P co CCGG 47.230 -999.990 ... V4 2014 07 15 09 50 00 -46.4337 51.8478 202.00 197.00 5.00 370237 CRZ 2013 12 17 10 17 00 2578-99 P co CCGG 47.030 -999.990 ... V4 2014 07 15 10 06 00 -46.4337 51.8478 202.00 197.00 5.00 370238 CRZ 2013 12 20 14 12 00 3931-99 P co CCGG 46.370 -999.990 ... V4 2014 07 15 09 18 00 -46.4337 51.8478 202.00 197.00 5.00 370233 CRZ 2013 12 20 14 12 00 3932-99 P co CCGG 46.180 -999.990 ... V4 2014 07 15 09 34 00 -46.4337 51.8478 202.00 197.00 5.00 370234 CRZ 2013 12 29 10 47 00 5343-99 P co CCGG 48.530 -999.990 ... V4 2014 07 14 17 01 00 -46.4337 51.8478 202.00 197.00 5.00 370231 CRZ 2013 12 29 10 47 00 5344-99 P co CCGG 49.230 -999.990 ... V4 2014 07 14 17 18 00 -46.4337 51.8478 202.00 197.00 5.00 370232 CRZ 2014 01 03 10 01 00 2641-99 P co CCGG 46.920 -999.990 ... V4 2014 07 14 16 29 00 -46.4337 51.8478 202.00 197.00 5.00 370229 CRZ 2014 01 03 10 01 00 2642-99 P co CCGG 45.770 -999.990 ... V4 2014 07 14 16 45 00 -46.4337 51.8478 202.00 197.00 5.00 370230 CRZ 2014 01 10 13 19 00 3795-99 P co CCGG 42.370 -999.990 ... V4 2014 07 14 15 25 00 -46.4337 51.8478 202.00 197.00 5.00 370225 CRZ 2014 01 10 13 19 00 3796-99 P co CCGG 42.740 -999.990 ... V4 2014 07 14 15 41 00 -46.4337 51.8478 202.00 197.00 5.00 370226 CRZ 2014 01 18 13 55 00 3861-99 P co CCGG 41.610 -999.990 ... V4 2014 07 14 15 57 00 -46.4337 51.8478 202.00 197.00 5.00 370227 CRZ 2014 01 18 13 55 00 3862-99 P co CCGG 41.450 -999.990 ... V4 2014 07 14 16 13 00 -46.4337 51.8478 202.00 197.00 5.00 370228 CRZ 2014 01 24 14 48 00 207-99 P co CCGG 45.740 -999.990 ... V4 2014 07 15 13 34 00 -46.4337 51.8478 202.00 197.00 5.00 370241 CRZ 2014 01 24 14 48 00 208-99 P co CCGG 43.890 -999.990 ... V4 2014 07 15 13 50 00 -46.4337 51.8478 202.00 197.00 5.00 370242 CRZ 2014 02 01 15 01 00 571-99 P co CCGG 39.700 -999.990 ... V4 2014 07 15 11 58 00 -46.4337 51.8478 202.00 197.00 5.00 370243 CRZ 2014 02 01 15 01 00 572-99 P co CCGG 40.040 -999.990 ... V4 2014 07 15 12 14 00 -46.4337 51.8478 202.00 197.00 5.00 370244 CRZ 2014 02 16 11 33 00 539-99 P co CCGG 40.250 -999.990 ... V4 2014 07 14 14 53 00 -46.4337 51.8478 202.00 197.00 5.00 370223 CRZ 2014 02 16 11 33 00 540-99 P co CCGG 40.810 -999.990 ... V4 2014 07 14 15 09 00 -46.4337 51.8478 202.00 197.00 5.00 370224 CRZ 2014 02 21 14 06 00 1393-99 P co CCGG 39.910 -999.990 ... V4 2014 07 15 12 30 00 -46.4337 51.8478 202.00 197.00 5.00 370245 CRZ 2014 02 21 14 06 00 1394-99 P co CCGG 40.660 -999.990 ... V4 2014 07 15 12 46 00 -46.4337 51.8478 202.00 197.00 5.00 370246 CRZ 2014 03 02 10 30 00 879-99 P co CCGG 44.650 -999.990 ... V4 2014 07 14 14 21 00 -46.4337 51.8478 202.00 197.00 5.00 370221 CRZ 2014 03 02 10 30 00 880-99 P co CCGG 45.510 -999.990 ... V4 2014 07 14 14 37 00 -46.4337 51.8478 202.00 197.00 5.00 370222 CRZ 2014 03 06 05 06 00 487-99 P co CCGG 43.580 -999.990 ... V4 2014 07 14 13 39 00 -46.4337 51.8478 202.00 197.00 5.00 370219 CRZ 2014 03 06 05 06 00 488-99 P co CCGG 43.360 -999.990 ... V4 2014 07 14 13 55 00 -46.4337 51.8478 202.00 197.00 5.00 370220 CRZ 2014 03 10 09 56 00 1880-99 P co CCGG 41.330 -999.990 ... V4 2015 02 09 13 38 00 -46.4337 51.8478 202.00 197.00 5.00 380856 CRZ 2014 03 10 09 56 00 1960-99 P co CCGG 42.340 -999.990 ... V4 2015 02 09 13 54 00 -46.4337 51.8478 202.00 197.00 5.00 380857 CRZ 2014 03 19 10 55 00 1509-99 P co CCGG 45.660 -999.990 ... V4 2015 02 05 12 01 00 -46.4337 51.8478 202.00 197.00 5.00 380584 CRZ 2014 03 19 10 55 00 690-99 P co CCGG 46.880 -999.990 ... V4 2015 02 05 11 45 00 -46.4337 51.8478 202.00 197.00 5.00 380585 CRZ 2014 03 25 10 55 00 4162-99 P co CCGG 42.630 -999.990 ... V4 2015 02 05 13 24 00 -46.4337 51.8478 202.00 197.00 5.00 380587 CRZ 2014 03 25 10 55 00 482-99 P co CCGG 43.070 -999.990 ... V4 2015 02 05 13 08 00 -46.4337 51.8478 202.00 197.00 5.00 380586 CRZ 2014 04 06 06 30 00 1389-99 P co CCGG 44.910 -999.990 ... V4 2015 02 05 08 32 00 -46.4337 51.8478 202.00 197.00 5.00 380592 CRZ 2014 04 13 13 12 00 3669-99 P co CCGG 52.740 -999.990 ... V4 2015 02 05 11 29 00 -46.4337 51.8478 202.00 197.00 5.00 380582 CRZ 2014 04 13 13 12 00 4633-99 P co CCGG 50.970 -999.990 ... V4 2015 02 05 11 13 00 -46.4337 51.8478 202.00 197.00 5.00 380583 CRZ 2014 04 21 10 12 00 1316-99 P co CCGG 48.410 -999.990 ... V4 2015 02 05 10 41 00 -46.4337 51.8478 202.00 197.00 5.00 380580 CRZ 2014 04 21 10 12 00 4808-99 P co CCGG 47.970 -999.990 ... V4 2015 02 05 10 57 00 -46.4337 51.8478 202.00 197.00 5.00 380581 CRZ 2014 05 01 13 30 00 2590-99 P co CCGG 48.860 -999.990 ... V4 2015 02 05 10 25 00 -46.4337 51.8478 202.00 197.00 5.00 380578 CRZ 2014 05 01 13 30 00 4844-99 P co CCGG 47.270 -999.990 ... V4 2015 02 05 10 09 00 -46.4337 51.8478 202.00 197.00 5.00 380579 CRZ 2014 05 08 12 45 00 5378-99 P co CCGG 48.020 -999.990 ... V4 2015 01 30 13 04 00 -46.4337 51.8478 202.00 197.00 5.00 380305 CRZ 2014 05 08 12 45 00 744-99 P co CCGG 47.890 -999.990 ... V4 2015 01 30 12 48 00 -46.4337 51.8478 202.00 197.00 5.00 380306 CRZ 2014 05 19 12 05 00 1114-99 P co CCGG 50.500 -999.990 ... V4 2015 02 03 09 02 00 -46.4337 51.8478 202.00 197.00 5.00 380304 CRZ 2014 05 19 12 05 00 4163-99 P co CCGG 48.300 -999.990 ... V4 2015 02 03 08 46 00 -46.4337 51.8478 202.00 197.00 5.00 380303 CRZ 2014 06 13 07 05 00 3038-99 P co CCGG 52.150 -999.990 ... V4 2015 02 03 11 42 00 -46.4337 51.8478 202.00 197.00 5.00 380405 CRZ 2014 06 13 07 05 00 4968-99 P co CCGG 51.310 -999.990 ... V4 2015 02 03 11 26 00 -46.4337 51.8478 202.00 197.00 5.00 380406 CRZ 2014 06 24 10 02 00 1484-99 P co CCGG 54.250 -999.990 ... V4 2015 02 03 10 38 00 -46.4337 51.8478 202.00 197.00 5.00 380302 CRZ 2014 06 24 10 02 00 281-99 P co CCGG 55.170 -999.990 ... V4 2015 02 03 10 22 00 -46.4337 51.8478 202.00 197.00 5.00 380301 CRZ 2014 06 27 08 59 00 1755-99 P co CCGG 53.730 -999.990 ... V4 2015 02 03 09 50 00 -46.4337 51.8478 202.00 197.00 5.00 380300 CRZ 2014 06 30 09 50 00 3090-99 P co CCGG 57.030 -999.990 ... V4 2015 02 03 09 34 00 -46.4337 51.8478 202.00 197.00 5.00 380299 CRZ 2014 06 30 09 50 00 913-99 P co CCGG 58.610 -999.990 ... V4 2015 02 03 09 18 00 -46.4337 51.8478 202.00 197.00 5.00 380298 CRZ 2014 07 05 11 20 00 4648-99 P co CCGG 59.650 -999.990 ... V4 2015 02 03 12 30 00 -46.4337 51.8478 202.00 197.00 5.00 380401 CRZ 2014 07 05 11 20 00 824-99 P co CCGG 60.760 -999.990 ... V4 2015 02 03 12 46 00 -46.4337 51.8478 202.00 197.00 5.00 380402 CRZ 2014 07 12 05 15 00 2087-99 P co CCGG 56.890 -999.990 ... V4 2015 02 03 12 14 00 -46.4337 51.8478 202.00 197.00 5.00 380404 CRZ 2014 07 12 05 15 00 583-99 P co CCGG 57.880 -999.990 ... V4 2015 02 03 11 58 00 -46.4337 51.8478 202.00 197.00 5.00 380403 CRZ 2014 07 16 09 30 00 3849-99 P co CCGG 56.370 -999.990 ... V4 2015 02 04 16 10 00 -46.4337 51.8478 202.00 197.00 5.00 380618 CRZ 2014 07 16 09 30 00 3850-99 P co CCGG 84.830 -999.990 A.. V4 2015 02 04 16 26 00 -46.4337 51.8478 202.00 197.00 5.00 380619 CRZ 2014 07 16 09 30 00 3850-99 P co CCGG 56.810 -999.990 ... V4 2015 02 05 12 17 00 -46.4337 51.8478 202.00 197.00 5.00 380619 CRZ 2014 07 21 10 59 00 2355-99 P co CCGG 58.240 -999.990 ... V4 2015 02 04 15 38 00 -46.4337 51.8478 202.00 197.00 5.00 380616 CRZ 2014 07 21 10 59 00 2356-99 P co CCGG 58.480 -999.990 ... V4 2015 02 04 15 54 00 -46.4337 51.8478 202.00 197.00 5.00 380617 CRZ 2014 07 29 12 16 00 4981-99 P co CCGG 58.830 -999.990 ... V4 2015 02 04 15 06 00 -46.4337 51.8478 202.00 197.00 5.00 380614 CRZ 2014 07 29 12 16 00 4982-99 P co CCGG 58.840 -999.990 ... V4 2015 02 04 15 22 00 -46.4337 51.8478 202.00 197.00 5.00 380615 CRZ 2014 08 07 10 22 00 397-99 P co CCGG 60.500 -999.990 ... V4 2015 02 04 14 34 00 -46.4337 51.8478 202.00 197.00 5.00 380612 CRZ 2014 08 07 10 22 00 398-99 P co CCGG 59.390 -999.990 ... V4 2015 02 04 14 50 00 -46.4337 51.8478 202.00 197.00 5.00 380613 CRZ 2014 08 16 13 15 00 3741-99 P co CCGG 61.150 -999.990 ... V4 2015 02 04 11 53 00 -46.4337 51.8478 202.00 197.00 5.00 380574 CRZ 2014 08 16 13 15 00 3742-99 P co CCGG 60.820 -999.990 ... V4 2015 02 04 12 09 00 -46.4337 51.8478 202.00 197.00 5.00 380575 CRZ 2014 08 25 19 05 00 2329-99 P co CCGG 61.610 -999.990 ... V4 2015 02 04 11 21 00 -46.4337 51.8478 202.00 197.00 5.00 380572 CRZ 2014 08 25 19 05 00 2330-99 P co CCGG 61.290 -999.990 ... V4 2015 02 04 11 37 00 -46.4337 51.8478 202.00 197.00 5.00 380573 CRZ 2014 09 04 11 25 00 2227-99 P co CCGG 63.000 -999.990 ... V4 2015 02 04 10 49 00 -46.4337 51.8478 202.00 197.00 5.00 380570 CRZ 2014 09 04 11 25 00 2228-99 P co CCGG 61.700 -999.990 ... V4 2015 02 04 11 05 00 -46.4337 51.8478 202.00 197.00 5.00 380571 CRZ 2014 09 12 06 23 00 3379-99 P co CCGG 60.300 -999.990 ... V4 2015 02 04 10 17 00 -46.4337 51.8478 202.00 197.00 5.00 380569 CRZ 2014 09 12 06 23 00 3380-99 P co CCGG 60.360 -999.990 ... V4 2015 02 04 10 33 00 -46.4337 51.8478 202.00 197.00 5.00 380568 CRZ 2014 09 21 13 58 00 2156-99 P co CCGG 59.790 -999.990 ... V4 2015 02 05 09 04 00 -46.4337 51.8478 202.00 197.00 5.00 380598 CRZ 2014 09 21 13 58 00 4144-99 P co CCGG 60.760 -999.990 ... V4 2015 02 05 09 20 00 -46.4337 51.8478 202.00 197.00 5.00 380599 CRZ 2014 09 30 10 40 00 2389-99 P co CCGG 61.110 -999.990 ... V4 2015 02 04 16 58 00 -46.4337 51.8478 202.00 197.00 5.00 380593 CRZ 2014 09 30 10 40 00 5397-99 P co CCGG 60.980 -999.990 ... V4 2015 02 04 16 42 00 -46.4337 51.8478 202.00 197.00 5.00 380594 CRZ 2014 10 07 12 52 00 3665-99 P co CCGG 60.860 -999.990 ... V4 2015 02 05 14 12 00 -46.4337 51.8478 202.00 197.00 5.00 380590 CRZ 2014 10 07 12 52 00 4744-99 P co CCGG 60.310 -999.990 ... V4 2015 02 05 14 28 00 -46.4337 51.8478 202.00 197.00 5.00 380591 CRZ 2014 10 19 10 50 00 5114-99 P co CCGG 58.380 -999.990 ... V4 2015 02 04 17 30 00 -46.4337 51.8478 202.00 197.00 5.00 380597 CRZ 2014 10 19 10 50 00 688-99 P co CCGG 58.700 -999.990 ... V4 2015 02 04 17 14 00 -46.4337 51.8478 202.00 197.00 5.00 380596 CRZ 2014 10 23 12 42 00 1093-99 P co CCGG 59.430 -999.990 ... V4 2015 02 05 13 40 00 -46.4337 51.8478 202.00 197.00 5.00 380588 CRZ 2014 10 23 12 42 00 1674-99 P co CCGG 60.070 -999.990 ... V4 2015 02 05 13 56 00 -46.4337 51.8478 202.00 197.00 5.00 380589 CRZ 2014 11 01 12 30 00 73-99 P co CCGG 57.120 -999.990 ... V4 2015 02 05 08 48 00 -46.4337 51.8478 202.00 197.00 5.00 380595 CRZ 2014 11 09 11 18 00 2601-99 P co CCGG 55.660 -999.990 ... V4 2015 02 12 16 23 00 -46.4337 51.8478 202.00 197.00 5.00 381267 CRZ 2014 11 09 11 18 00 2614-99 P co CCGG 56.300 -999.990 ... V4 2015 02 12 16 07 00 -46.4337 51.8478 202.00 197.00 5.00 381268 CRZ 2014 11 17 10 45 00 1648-99 P co CCGG 52.100 -999.990 ... V4 2015 02 12 14 16 00 -46.4337 51.8478 202.00 197.00 5.00 381266 CRZ 2014 11 17 10 45 00 3352-99 P co CCGG 52.460 -999.990 ... V4 2015 02 12 14 00 00 -46.4337 51.8478 202.00 197.00 5.00 381265 CRZ 2014 11 25 09 17 00 1664-99 P co CCGG 52.340 -999.990 ... V4 2015 10 23 10 27 00 -46.4337 51.8478 202.00 197.00 5.00 396311 CRZ 2015 01 15 11 22 00 1263-99 P co CCGG 42.610 -999.990 ... V4 2015 10 20 13 56 00 -46.4337 51.8478 202.00 197.00 5.00 396303 CRZ 2015 01 15 11 22 00 3768-99 P co CCGG 43.240 -999.990 ... V4 2015 10 20 13 41 00 -46.4337 51.8478 202.00 197.00 5.00 396304 CRZ 2015 02 01 09 45 00 1576-99 P co CCGG 44.060 -999.990 ... V4 2015 10 23 11 14 00 -46.4337 51.8478 202.00 197.00 5.00 396309 CRZ 2015 02 01 09 45 00 1756-99 P co CCGG 44.970 -999.990 ... V4 2015 10 23 11 30 00 -46.4337 51.8478 202.00 197.00 5.00 396310 CRZ 2015 02 23 12 45 00 2968-99 P co CCGG 41.700 -999.990 ... V4 2015 10 20 12 21 00 -46.4337 51.8478 202.00 197.00 5.00 396302 CRZ 2015 02 23 12 45 00 944-99 P co CCGG 40.520 -999.990 ... V4 2015 10 20 12 06 00 -46.4337 51.8478 202.00 197.00 5.00 396301 CRZ 2015 03 10 10 10 00 2063-99 P co CCGG 42.010 -999.990 ... V4 2015 10 23 10 43 00 -46.4337 51.8478 202.00 197.00 5.00 396305 CRZ 2015 03 10 10 10 00 6566-66 P co CCGG 40.730 -999.990 ... V4 2015 10 23 10 58 00 -46.4337 51.8478 202.00 197.00 5.00 396306 CRZ 2015 03 26 11 31 00 4027-99 P co CCGG 49.760 -999.990 ... V4 2015 10 20 11 50 00 -46.4337 51.8478 202.00 197.00 5.00 396298 CRZ 2015 03 26 11 31 00 6038-66 P co CCGG 50.580 -999.990 ... V4 2015 10 20 11 34 00 -46.4337 51.8478 202.00 197.00 5.00 396297 CRZ 2015 04 16 09 23 00 3998-99 P co CCGG 46.380 -999.990 ... V4 2015 10 23 09 55 00 -46.4337 51.8478 202.00 197.00 5.00 396308 CRZ 2015 04 16 09 23 00 4164-99 P co CCGG 46.300 -999.990 ... V4 2015 10 23 09 39 00 -46.4337 51.8478 202.00 197.00 5.00 396307 CRZ 2015 05 05 10 57 00 1533-99 P co CCGG 46.160 -999.990 ... V4 2015 10 20 13 25 00 -46.4337 51.8478 202.00 197.00 5.00 396300 CRZ 2015 05 05 10 57 00 4613-99 P co CCGG 46.720 -999.990 ... V4 2015 10 20 13 09 00 -46.4337 51.8478 202.00 197.00 5.00 396299 CRZ 2015 05 21 11 33 00 2698-99 P co CCGG 61.610 -999.990 .X. V4 2016 01 22 09 57 00 -46.4337 51.8478 202.00 197.00 5.00 400505 CRZ 2015 05 21 11 33 00 4150-99 P co CCGG 60.310 -999.990 .X. V4 2016 01 22 09 42 00 -46.4337 51.8478 202.00 197.00 5.00 400504 CRZ 2015 06 08 10 20 00 3199-99 P co CCGG 52.230 -999.990 ... V4 2016 01 20 17 13 00 -46.4337 51.8478 202.00 197.00 5.00 400448 CRZ 2015 06 08 10 20 00 4234-99 P co CCGG 52.540 -999.990 ... V4 2016 01 20 16 57 00 -46.4337 51.8478 202.00 197.00 5.00 400449 CRZ 2015 07 01 10 28 00 1437-99 P co CCGG 56.230 -999.990 ... V4 2016 01 21 09 18 00 -46.4337 51.8478 202.00 197.00 5.00 400446 CRZ 2015 07 01 10 28 00 361-99 P co CCGG 56.450 -999.990 ... V4 2016 01 21 09 02 00 -46.4337 51.8478 202.00 197.00 5.00 400447 CRZ 2015 07 20 09 29 00 1892-99 P co CCGG 55.330 -999.990 ... V4 2016 01 21 17 00 00 -46.4337 51.8478 202.00 197.00 5.00 400502 CRZ 2015 07 20 09 29 00 4326-99 P co CCGG 289.270 -999.990 N.. V4 2016 01 21 17 16 00 -46.4337 51.8478 202.00 197.00 5.00 400503 CRZ 2015 08 08 10 57 00 1132-99 P co CCGG 69.950 -999.990 .X. V4 2016 01 21 10 05 00 -46.4337 51.8478 202.00 197.00 5.00 400444 CRZ 2015 08 08 10 57 00 4656-99 P co CCGG 68.000 -999.990 .X. V4 2016 01 21 10 21 00 -46.4337 51.8478 202.00 197.00 5.00 400445 CRZ 2015 08 15 12 06 00 1427-99 P co CCGG 58.990 -999.990 ... V4 2016 01 21 16 28 00 -46.4337 51.8478 202.00 197.00 5.00 400500 CRZ 2015 08 15 12 06 00 4450-99 P co CCGG 57.570 -999.990 ... V4 2016 01 21 16 44 00 -46.4337 51.8478 202.00 197.00 5.00 400501 CRZ 2015 08 26 09 03 00 1411-99 P co CCGG 59.700 -999.990 ... V4 2016 01 21 15 57 00 -46.4337 51.8478 202.00 197.00 5.00 400498 CRZ 2015 08 26 09 03 00 2757-99 P co CCGG 60.370 -999.990 ... V4 2016 01 21 16 12 00 -46.4337 51.8478 202.00 197.00 5.00 400499 CRZ 2015 09 01 09 27 00 1384-99 P co CCGG 64.370 -999.990 N.. V4 2016 01 21 09 34 00 -46.4337 51.8478 202.00 197.00 5.00 400442 CRZ 2015 09 01 09 27 00 1697-99 P co CCGG 61.110 -999.990 ... V4 2016 01 21 09 50 00 -46.4337 51.8478 202.00 197.00 5.00 400443 CRZ 2015 09 07 12 28 00 3316-99 P co CCGG 61.920 -999.990 ... V4 2016 01 22 10 13 00 -46.4337 51.8478 202.00 197.00 5.00 400488 CRZ 2015 09 20 10 37 00 6196-66 P co CCGG 61.420 -999.990 ... V4 2016 01 22 10 29 00 -46.4337 51.8478 202.00 197.00 5.00 400489 CRZ 2015 09 28 07 14 00 3374-99 P co CCGG 60.190 -999.990 ... V4 2016 01 22 11 01 00 -46.4337 51.8478 202.00 197.00 5.00 400486 CRZ 2015 09 28 07 14 00 592-99 P co CCGG 59.750 -999.990 ... V4 2016 01 22 10 45 00 -46.4337 51.8478 202.00 197.00 5.00 400487 CRZ 2015 10 04 10 02 00 13-99 P co CCGG 59.280 -999.990 ... V4 2016 01 25 09 42 00 -46.4337 51.8478 202.00 197.00 5.00 400464 CRZ 2015 10 04 10 02 00 264-99 P co CCGG 60.700 -999.990 ... V4 2016 01 25 09 58 00 -46.4337 51.8478 202.00 197.00 5.00 400465 CRZ 2015 10 12 09 28 00 3707-99 P co CCGG 61.490 -999.990 ... V4 2016 01 22 11 17 00 -46.4337 51.8478 202.00 197.00 5.00 400484 CRZ 2015 10 12 09 28 00 5185-99 P co CCGG 60.990 -999.990 ... V4 2016 01 22 11 33 00 -46.4337 51.8478 202.00 197.00 5.00 400485 CRZ 2015 10 19 06 09 00 481-99 P co CCGG 61.210 -999.990 ... V4 2016 01 22 14 58 00 -46.4337 51.8478 202.00 197.00 5.00 400462 CRZ 2015 10 19 06 09 00 623-99 P co CCGG 60.640 -999.990 ... V4 2016 01 22 15 14 00 -46.4337 51.8478 202.00 197.00 5.00 400463 CRZ 2015 10 24 11 04 00 1019-99 P co CCGG 58.470 -999.990 ... V4 2016 01 25 09 11 00 -46.4337 51.8478 202.00 197.00 5.00 400460 CRZ 2015 10 24 11 04 00 4383-99 P co CCGG 58.720 -999.990 ... V4 2016 01 25 09 26 00 -46.4337 51.8478 202.00 197.00 5.00 400461 CRZ 2015 11 01 06 38 00 1812-99 P co CCGG 56.560 -999.990 ... V4 2016 01 22 11 49 00 -46.4337 51.8478 202.00 197.00 5.00 400482 CRZ 2015 11 01 06 38 00 2075-99 P co CCGG 57.720 -999.990 ... V4 2016 01 22 12 04 00 -46.4337 51.8478 202.00 197.00 5.00 400483 CRZ 2015 11 11 10 37 00 4005-99 P co CCGG 56.540 -999.990 ... V4 2016 05 17 13 37 00 -46.4337 51.8478 202.00 197.00 5.00 406817 CRZ 2015 11 11 10 37 00 486-99 P co CCGG 55.920 -999.990 ... V4 2016 05 17 13 21 00 -46.4337 51.8478 202.00 197.00 5.00 406816 CRZ 2015 11 18 09 44 00 1270-99 P co CCGG 59.620 -999.990 ... V4 2016 05 16 10 15 00 -46.4337 51.8478 202.00 197.00 5.00 406836 CRZ 2015 11 18 09 44 00 4679-99 P co CCGG 58.420 -999.990 ... V4 2016 05 16 10 31 00 -46.4337 51.8478 202.00 197.00 5.00 406837 CRZ 2015 11 29 07 17 00 2005-99 P co CCGG 56.520 -999.990 N.. V4 2016 05 16 11 51 00 -46.4337 51.8478 202.00 197.00 5.00 406850 CRZ 2015 11 29 07 17 00 4261-99 P co CCGG 52.830 -999.990 N.. V4 2016 05 16 12 06 00 -46.4337 51.8478 202.00 197.00 5.00 406851 CRZ 2015 12 07 14 16 00 1441-99 P co CCGG 54.020 -999.990 ... V4 2016 05 16 10 00 00 -46.4337 51.8478 202.00 197.00 5.00 406835 CRZ 2015 12 07 14 16 00 554-99 P co CCGG 54.580 -999.990 ... V4 2016 05 16 09 44 00 -46.4337 51.8478 202.00 197.00 5.00 406834 CRZ 2015 12 20 14 20 00 3282-99 P co CCGG 50.080 -999.990 ... V4 2016 05 16 11 19 00 -46.4337 51.8478 202.00 197.00 5.00 406848 CRZ 2015 12 20 14 20 00 4133-99 P co CCGG 49.460 -999.990 ... V4 2016 05 16 11 35 00 -46.4337 51.8478 202.00 197.00 5.00 406849 CRZ 2015 12 26 10 38 00 1912-99 P co CCGG 48.890 -999.990 ... V4 2016 05 13 15 52 00 -46.4337 51.8478 202.00 197.00 5.00 406833 CRZ 2015 12 26 10 38 00 3171-99 P co CCGG 48.940 -999.990 ... V4 2016 05 13 15 36 00 -46.4337 51.8478 202.00 197.00 5.00 406832 CRZ 2016 01 03 10 27 00 1477-99 P co CCGG 48.840 -999.990 ... V4 2016 05 16 10 47 00 -46.4337 51.8478 202.00 197.00 5.00 406838 CRZ 2016 01 03 10 27 00 3729-99 P co CCGG 49.890 -999.990 ... V4 2016 05 16 11 03 00 -46.4337 51.8478 202.00 197.00 5.00 406839 CRZ 2016 01 12 13 19 00 377-99 P co CCGG 48.650 -999.990 ... V4 2016 05 17 12 49 00 -46.4337 51.8478 202.00 197.00 5.00 406862 CRZ 2016 01 12 13 19 00 439-99 P co CCGG 47.870 -999.990 ... V4 2016 05 17 13 05 00 -46.4337 51.8478 202.00 197.00 5.00 406863 CRZ 2016 01 20 12 35 00 2680-99 P co CCGG 49.330 -999.990 ... V4 2016 05 17 14 40 00 -46.4337 51.8478 202.00 197.00 5.00 406819 CRZ 2016 01 26 06 53 00 2559-99 P co CCGG 47.530 -999.990 ... V4 2016 05 13 15 20 00 -46.4337 51.8478 202.00 197.00 5.00 406847 CRZ 2016 01 26 06 53 00 417-99 P co CCGG 46.830 -999.990 ... V4 2016 05 13 15 04 00 -46.4337 51.8478 202.00 197.00 5.00 406846 CRZ 2016 02 01 12 35 00 1134-99 P co CCGG 44.450 -999.990 ... V4 2016 05 17 14 56 00 -46.4337 51.8478 202.00 197.00 5.00 406822 CRZ 2016 02 01 12 35 00 5397-99 P co CCGG 43.450 -999.990 ... V4 2016 05 17 15 12 00 -46.4337 51.8478 202.00 197.00 5.00 406823 CRZ 2016 02 08 10 35 00 2176-99 P co CCGG 46.550 -999.990 ... V4 2016 05 13 14 33 00 -46.4337 51.8478 202.00 197.00 5.00 406844 CRZ 2016 02 08 10 35 00 2729-99 P co CCGG 44.440 -999.990 ... V4 2016 05 13 14 49 00 -46.4337 51.8478 202.00 197.00 5.00 406845 CRZ 2016 02 15 06 15 00 900-99 P co CCGG 46.910 -999.990 ... V4 2016 05 17 14 24 00 -46.4337 51.8478 202.00 197.00 5.00 406818 CRZ 2016 02 23 05 43 00 288-99 P co CCGG 46.170 -999.990 ... V4 2016 05 13 14 01 00 -46.4337 51.8478 202.00 197.00 5.00 406842 CRZ 2016 02 23 05 43 00 2896-99 P co CCGG 45.270 -999.990 ... V4 2016 05 13 14 17 00 -46.4337 51.8478 202.00 197.00 5.00 406843 CRZ 2016 03 03 06 20 00 1295-99 P co CCGG 46.370 -999.990 ... V4 2016 05 17 13 53 00 -46.4337 51.8478 202.00 197.00 5.00 406820 CRZ 2016 03 03 06 20 00 1913-99 P co CCGG 45.580 -999.990 ... V4 2016 05 17 14 09 00 -46.4337 51.8478 202.00 197.00 5.00 406821 CRZ 2016 03 06 10 43 00 4259-99 P co CCGG 45.760 -999.990 ... V4 2016 05 13 13 14 00 -46.4337 51.8478 202.00 197.00 5.00 406841 CRZ 2016 03 06 10 43 00 786-99 P co CCGG 46.360 -999.990 ... V4 2016 05 13 12 58 00 -46.4337 51.8478 202.00 197.00 5.00 406840 CRZ 2016 03 14 06 45 00 3495-99 P co CCGG 48.010 -999.990 ... V4 2017 01 20 15 02 00 -46.4337 51.8478 202.00 197.00 5.00 419372 CRZ 2016 03 14 06 45 00 4847-99 P co CCGG 45.990 -999.990 ... V4 2017 01 20 15 18 00 -46.4337 51.8478 202.00 197.00 5.00 419373 CRZ 2016 03 21 11 20 00 1450-99 P co CCGG 47.340 -999.990 ... V4 2017 01 20 14 47 00 -46.4337 51.8478 202.00 197.00 5.00 419370 CRZ 2016 03 21 11 20 00 953-99 P co CCGG 46.790 -999.990 ... V4 2017 01 20 14 31 00 -46.4337 51.8478 202.00 197.00 5.00 419371 CRZ 2016 03 26 13 25 00 4366-99 P co CCGG 47.100 -999.990 ... V4 2017 01 20 13 59 00 -46.4337 51.8478 202.00 197.00 5.00 419368 CRZ 2016 03 26 13 25 00 5021-99 P co CCGG 46.580 -999.990 ... V4 2017 01 20 14 15 00 -46.4337 51.8478 202.00 197.00 5.00 419369 CRZ 2016 04 03 13 40 00 2531-99 P co CCGG 48.490 -999.990 ... V4 2017 01 20 13 27 00 -46.4337 51.8478 202.00 197.00 5.00 419366 CRZ 2016 04 03 13 40 00 4127-99 P co CCGG 48.580 -999.990 ... V4 2017 01 20 13 43 00 -46.4337 51.8478 202.00 197.00 5.00 419367 CRZ 2016 04 12 12 55 00 72-99 P co CCGG 47.910 -999.990 ... V4 2017 01 23 16 44 00 -46.4337 51.8478 202.00 197.00 5.00 419390 CRZ 2016 04 19 06 56 00 3984-99 P co CCGG 48.190 -999.990 ... V4 2017 01 24 11 58 00 -46.4337 51.8478 202.00 197.00 5.00 419418 CRZ 2016 04 26 12 45 00 4012-99 P co CCGG 49.630 -999.990 ... V4 2017 01 20 17 09 00 -46.4337 51.8478 202.00 197.00 5.00 419362 CRZ 2016 04 26 12 45 00 6480-66 P co CCGG 50.100 -999.990 ... V4 2017 01 20 17 25 00 -46.4337 51.8478 202.00 197.00 5.00 419363 CRZ 2016 05 06 05 48 00 911-99 P co CCGG 50.200 -999.990 ... V4 2017 01 20 16 38 00 -46.4337 51.8478 202.00 197.00 5.00 419364 CRZ 2016 05 06 05 48 00 912-99 P co CCGG 49.930 -999.990 ... V4 2017 01 20 16 53 00 -46.4337 51.8478 202.00 197.00 5.00 419365 CRZ 2016 05 10 06 57 00 2139-99 P co CCGG 51.210 -999.990 ... V4 2017 01 23 13 46 00 -46.4337 51.8478 202.00 197.00 5.00 419348 CRZ 2016 05 10 06 57 00 959-99 P co CCGG 51.660 -999.990 ... V4 2017 01 23 13 30 00 -46.4337 51.8478 202.00 197.00 5.00 419349 CRZ 2016 05 17 11 10 00 3619-99 P co CCGG 50.600 -999.990 ... V4 2017 01 23 12 59 00 -46.4337 51.8478 202.00 197.00 5.00 419346 CRZ 2016 05 17 11 10 00 5094-99 P co CCGG 50.970 -999.990 ... V4 2017 01 23 13 14 00 -46.4337 51.8478 202.00 197.00 5.00 419347 CRZ 2016 05 22 07 57 00 3213-99 P co CCGG 56.790 -999.990 N.. V4 2017 01 23 12 43 00 -46.4337 51.8478 202.00 197.00 5.00 419344 CRZ 2016 05 22 07 57 00 788-99 P co CCGG 53.130 -999.990 ... V4 2017 01 23 12 27 00 -46.4337 51.8478 202.00 197.00 5.00 419345 CRZ 2016 06 01 05 40 00 510-99 P co CCGG 82.110 -999.990 +.. V4 2017 01 20 17 41 00 -46.4337 51.8478 202.00 197.00 5.00 419342 CRZ 2016 06 01 05 40 00 939-99 P co CCGG 79.070 -999.990 -.. V4 2017 01 20 17 57 00 -46.4337 51.8478 202.00 197.00 5.00 419343 CRZ 2016 06 09 09 38 00 1765-99 P co CCGG 68.330 -999.990 .X. V4 2017 01 24 12 14 00 -46.4337 51.8478 202.00 197.00 5.00 419393 CRZ 2016 06 18 12 12 00 4376-99 P co CCGG 54.320 -999.990 N.. V4 2017 01 19 14 33 00 -46.4337 51.8478 202.00 197.00 5.00 419341 CRZ 2016 06 18 12 12 00 639-99 P co CCGG 57.690 -999.990 N.. V4 2017 01 19 14 17 00 -46.4337 51.8478 202.00 197.00 5.00 419340 CRZ 2016 06 28 06 36 00 2516-99 P co CCGG 56.140 -999.990 ... V4 2017 01 23 16 12 00 -46.4337 51.8478 202.00 197.00 5.00 419392 CRZ 2016 07 06 05 27 00 1697-99 P co CCGG 61.700 -999.990 ... V4 2017 01 19 13 45 00 -46.4337 51.8478 202.00 197.00 5.00 419338 CRZ 2016 07 06 05 27 00 2213-99 P co CCGG 61.820 -999.990 ... V4 2017 01 19 14 01 00 -46.4337 51.8478 202.00 197.00 5.00 419339 CRZ 2016 07 12 09 52 00 1800-99 P co CCGG 68.250 -999.990 ... V4 2017 01 20 16 06 00 -46.4337 51.8478 202.00 197.00 5.00 419360 CRZ 2016 07 12 09 52 00 3781-99 P co CCGG 66.370 -999.990 ... V4 2017 01 20 16 22 00 -46.4337 51.8478 202.00 197.00 5.00 419361 CRZ 2016 07 19 12 13 00 1257-99 P co CCGG 58.880 -999.990 ... V4 2017 01 20 15 34 00 -46.4337 51.8478 202.00 197.00 5.00 419358 CRZ 2016 07 19 12 13 00 3428-99 P co CCGG 58.340 -999.990 ... V4 2017 01 20 15 50 00 -46.4337 51.8478 202.00 197.00 5.00 419359 CRZ 2016 07 27 12 15 00 1305-99 P co CCGG 59.370 -999.990 ... V4 2017 01 20 12 56 00 -46.4337 51.8478 202.00 197.00 5.00 419356 CRZ 2016 07 27 12 15 00 3891-99 P co CCGG 60.990 -999.990 ... V4 2017 01 20 13 11 00 -46.4337 51.8478 202.00 197.00 5.00 419357 CRZ 2016 08 03 06 53 00 3877-99 P co CCGG 62.090 -999.990 ... V4 2017 01 23 16 28 00 -46.4337 51.8478 202.00 197.00 5.00 419391 CRZ 2016 08 16 10 03 00 1421-99 P co CCGG 62.530 -999.990 ... V4 2017 01 20 11 52 00 -46.4337 51.8478 202.00 197.00 5.00 419354 CRZ 2016 08 16 10 03 00 4317-99 P co CCGG 59.870 -999.990 ... V4 2017 01 20 12 08 00 -46.4337 51.8478 202.00 197.00 5.00 419355 CRZ 2016 08 24 05 40 00 1789-99 P co CCGG 64.100 -999.990 ... V4 2017 01 20 12 24 00 -46.4337 51.8478 202.00 197.00 5.00 419352 CRZ 2016 08 24 05 40 00 3509-99 P co CCGG 63.140 -999.990 ... V4 2017 01 20 12 40 00 -46.4337 51.8478 202.00 197.00 5.00 419353 CRZ 2016 08 31 11 10 00 1098-99 P co CCGG 64.340 -999.990 ... V4 2017 01 20 11 20 00 -46.4337 51.8478 202.00 197.00 5.00 419350 CRZ 2016 08 31 11 10 00 2117-99 P co CCGG 62.460 -999.990 ... V4 2017 01 20 11 36 00 -46.4337 51.8478 202.00 197.00 5.00 419351 CRZ 2016 09 07 07 18 00 3217-99 P co CCGG 63.850 -999.990 ... V4 2017 01 19 13 13 00 -46.4337 51.8478 202.00 197.00 5.00 419336 CRZ 2016 09 07 07 18 00 3301-99 P co CCGG 62.850 -999.990 ... V4 2017 01 19 13 29 00 -46.4337 51.8478 202.00 197.00 5.00 419337 CRZ 2016 09 14 12 08 00 2977-99 P co CCGG 62.470 -999.990 ... V4 2017 01 19 12 42 00 -46.4337 51.8478 202.00 197.00 5.00 419334 CRZ 2016 09 14 12 08 00 3593-99 P co CCGG 61.510 -999.990 ... V4 2017 01 19 12 58 00 -46.4337 51.8478 202.00 197.00 5.00 419335 CRZ 2016 09 21 12 43 00 1011-99 P co CCGG 65.270 -999.990 ... V4 2017 01 19 16 28 00 -46.4337 51.8478 202.00 197.00 5.00 419332 CRZ 2016 09 21 12 43 00 3925-99 P co CCGG 63.330 -999.990 ... V4 2017 01 19 16 44 00 -46.4337 51.8478 202.00 197.00 5.00 419333 CRZ 2016 09 30 11 21 00 4416-99 P co CCGG 58.100 -999.990 A.. V4 2017 01 19 15 56 00 -46.4337 51.8478 202.00 197.00 5.00 419330 CRZ 2016 09 30 11 21 00 4667-99 P co CCGG 61.810 -999.990 ... V4 2017 01 19 16 12 00 -46.4337 51.8478 202.00 197.00 5.00 419331 CRZ 2016 10 08 07 39 00 2429-99 P co CCGG 63.310 -999.990 ... V4 2017 01 19 15 24 00 -46.4337 51.8478 202.00 197.00 5.00 419328 CRZ 2016 10 08 07 39 00 5345-99 P co CCGG 62.930 -999.990 ... V4 2017 01 19 15 40 00 -46.4337 51.8478 202.00 197.00 5.00 419329 CRZ 2016 10 14 13 05 00 3184-99 P co CCGG 61.560 -999.990 ... V4 2017 01 19 14 53 00 -46.4337 51.8478 202.00 197.00 5.00 419326 CRZ 2016 10 14 13 05 00 4082-99 P co CCGG 61.550 -999.990 ... V4 2017 01 19 15 09 00 -46.4337 51.8478 202.00 197.00 5.00 419327 CRZ 2016 10 22 07 10 00 4-99 P co CCGG 62.230 -999.990 ... V4 2017 01 24 12 30 00 -46.4337 51.8478 202.00 197.00 5.00 419416 CRZ 2016 10 22 07 10 00 4234-99 P co CCGG 62.330 -999.990 ... V4 2017 01 24 12 45 00 -46.4337 51.8478 202.00 197.00 5.00 419417 CRZ 2016 10 29 12 36 00 3782-99 P co CCGG 59.630 -999.990 ... V4 2017 01 24 11 42 00 -46.4337 51.8478 202.00 197.00 5.00 419415 CRZ 2016 10 29 12 36 00 857-99 P co CCGG 58.800 -999.990 ... V4 2017 01 24 11 26 00 -46.4337 51.8478 202.00 197.00 5.00 419414 CRZ 2016 11 05 12 12 00 2622-99 P co CCGG 60.050 -999.990 ... V4 2017 05 22 13 42 00 -46.4337 51.8478 202.00 197.00 5.00 425581 CRZ 2016 11 05 12 12 00 490-99 P co CCGG 61.000 -999.990 ... V4 2017 05 22 13 26 00 -46.4337 51.8478 202.00 197.00 5.00 425580 CRZ 2016 11 10 10 25 00 1325-99 P co CCGG 57.590 -999.990 ... V4 2017 05 22 12 54 00 -46.4337 51.8478 202.00 197.00 5.00 425578 CRZ 2016 11 10 10 25 00 4400-99 P co CCGG 58.390 -999.990 ... V4 2017 05 22 13 10 00 -46.4337 51.8478 202.00 197.00 5.00 425579 CRZ 2016 11 19 12 46 00 3533-99 P co CCGG 54.630 -999.990 ... V4 2017 05 22 14 29 00 -46.4337 51.8478 202.00 197.00 5.00 425576 CRZ 2016 11 19 12 46 00 4868-99 P co CCGG 54.540 -999.990 ... V4 2017 05 22 14 45 00 -46.4337 51.8478 202.00 197.00 5.00 425577 CRZ 2016 11 24 09 33 00 1480-99 P co CCGG 53.800 -999.990 ... V4 2017 05 22 13 58 00 -46.4337 51.8478 202.00 197.00 5.00 425574 CRZ 2016 11 24 09 33 00 1791-99 P co CCGG 53.740 -999.990 ... V4 2017 05 22 14 14 00 -46.4337 51.8478 202.00 197.00 5.00 425575 CRZ 2016 12 01 14 03 00 2130-99 P co CCGG 52.120 -999.990 ... V4 2017 05 24 16 57 00 -46.4337 51.8478 202.00 197.00 5.00 425572 CRZ 2016 12 01 14 03 00 3710-99 P co CCGG 53.550 -999.990 ... V4 2017 05 24 17 13 00 -46.4337 51.8478 202.00 197.00 5.00 425573 CRZ 2016 12 07 10 37 00 1214-99 P co CCGG 52.680 -999.990 ... V4 2017 05 24 16 25 00 -46.4337 51.8478 202.00 197.00 5.00 425570 CRZ 2016 12 07 10 37 00 3652-99 P co CCGG 51.500 -999.990 ... V4 2017 05 24 16 41 00 -46.4337 51.8478 202.00 197.00 5.00 425571 CRZ 2016 12 15 12 35 00 1309-99 P co CCGG 52.710 -999.990 ... V4 2017 05 24 15 53 00 -46.4337 51.8478 202.00 197.00 5.00 425568 CRZ 2016 12 15 12 35 00 4535-99 P co CCGG 51.210 -999.990 ... V4 2017 05 24 16 09 00 -46.4337 51.8478 202.00 197.00 5.00 425569 CRZ 2016 12 24 09 50 00 4154-99 P co CCGG 46.700 -999.990 ... V4 2017 05 24 15 37 00 -46.4337 51.8478 202.00 197.00 5.00 425566 CRZ 2016 12 24 09 50 00 600-99 P co CCGG 47.880 -999.990 ... V4 2017 05 24 15 22 00 -46.4337 51.8478 202.00 197.00 5.00 425567 CRZ 2016 12 31 10 00 00 1960-99 P co CCGG 53.770 -999.990 ... V4 2017 05 24 14 50 00 -46.4337 51.8478 202.00 197.00 5.00 425588 CRZ 2016 12 31 10 00 00 3245-99 P co CCGG 54.230 -999.990 ... V4 2017 05 24 15 06 00 -46.4337 51.8478 202.00 197.00 5.00 425589 CRZ 2017 01 17 10 35 00 1336-99 P co CCGG 44.140 -999.990 ... V4 2017 05 24 14 34 00 -46.4337 51.8478 202.00 197.00 5.00 425587 CRZ 2017 01 17 10 35 00 328-99 P co CCGG 44.610 -999.990 ... V4 2017 05 24 14 18 00 -46.4337 51.8478 202.00 197.00 5.00 425586 CRZ 2017 01 26 13 00 00 2578-99 P co CCGG 69.150 -999.990 N.. V4 2017 05 24 11 56 00 -46.4337 51.8478 202.00 197.00 5.00 425585 CRZ 2017 01 26 13 00 00 909-99 P co CCGG 43.070 -999.990 ... V4 2017 05 24 11 40 00 -46.4337 51.8478 202.00 197.00 5.00 425584 CRZ 2017 02 09 09 12 00 2880-99 P co CCGG 46.940 -999.990 ... V4 2017 05 23 15 20 00 -46.4337 51.8478 202.00 197.00 5.00 425582 CRZ 2017 02 09 09 12 00 2999-99 P co CCGG 46.270 -999.990 ... V4 2017 05 23 15 36 00 -46.4337 51.8478 202.00 197.00 5.00 425583 CRZ 2017 02 19 09 55 00 347-99 P co CCGG 44.550 -999.990 ... V4 2017 05 19 12 46 00 -46.4337 51.8478 202.00 197.00 5.00 425564 CRZ 2017 02 19 09 55 00 974-99 P co CCGG 42.220 -999.990 ... V4 2017 05 19 13 02 00 -46.4337 51.8478 202.00 197.00 5.00 425565 CRZ 2017 02 27 11 00 00 3409-99 P co CCGG 43.350 -999.990 ... V4 2017 05 19 13 18 00 -46.4337 51.8478 202.00 197.00 5.00 425562 CRZ 2017 02 27 11 00 00 4106-99 P co CCGG 45.650 -999.990 ... V4 2017 05 19 13 34 00 -46.4337 51.8478 202.00 197.00 5.00 425563 CRZ 2017 03 06 09 15 00 323-99 P co CCGG 43.300 -999.990 ... V4 2017 05 19 12 14 00 -46.4337 51.8478 202.00 197.00 5.00 425560 CRZ 2017 03 06 09 15 00 4019-99 P co CCGG 43.750 -999.990 ... V4 2017 05 19 12 30 00 -46.4337 51.8478 202.00 197.00 5.00 425561 CRZ 2017 03 13 06 00 00 1763-99 P co CCGG 41.780 -999.990 ... V4 2017 05 19 11 43 00 -46.4337 51.8478 202.00 197.00 5.00 425558 CRZ 2017 03 13 06 00 00 1966-99 P co CCGG 40.860 -999.990 ... V4 2017 05 19 11 59 00 -46.4337 51.8478 202.00 197.00 5.00 425559 CRZ 2017 03 20 05 30 00 2931-99 P co CCGG 42.810 -999.990 ... V2 2017 09 27 14 04 00 -46.4337 51.8478 202.00 197.00 5.00 431216 CRZ 2017 03 20 05 30 00 2932-99 P co CCGG 42.630 -999.990 ... V2 2017 09 27 14 19 00 -46.4337 51.8478 202.00 197.00 5.00 431217 CRZ 2017 04 02 11 30 00 2925-99 P co CCGG 43.540 -999.990 ... V2 2017 09 27 16 10 00 -46.4337 51.8478 202.00 197.00 5.00 431168 CRZ 2017 04 02 11 30 00 2926-99 P co CCGG 43.740 -999.990 ... V2 2017 09 27 16 26 00 -46.4337 51.8478 202.00 197.00 5.00 431169 CRZ 2017 04 09 06 30 00 2047-99 P co CCGG 49.720 -999.990 ... V2 2017 09 27 14 35 00 -46.4337 51.8478 202.00 197.00 5.00 431218 CRZ 2017 04 09 06 30 00 2048-99 P co CCGG 49.510 -999.990 ... V2 2017 09 27 14 51 00 -46.4337 51.8478 202.00 197.00 5.00 431219 CRZ 2017 04 24 10 00 00 4781-99 P co CCGG 44.800 -999.990 ... V2 2017 09 27 16 42 00 -46.4337 51.8478 202.00 197.00 5.00 431170 CRZ 2017 04 24 10 00 00 4782-99 P co CCGG 45.360 -999.990 ... V2 2017 09 27 16 58 00 -46.4337 51.8478 202.00 197.00 5.00 431171 CRZ 2017 04 28 10 00 00 2669-99 P co CCGG 51.370 -999.990 N.. V2 2017 09 28 10 58 00 -46.4337 51.8478 202.00 197.00 5.00 431172 CRZ 2017 04 28 10 00 00 2670-99 P co CCGG 47.470 -999.990 N.. V2 2017 09 28 11 14 00 -46.4337 51.8478 202.00 197.00 5.00 431173 CRZ 2017 05 05 09 25 00 559-99 P co CCGG 48.370 -999.990 ... V2 2017 09 27 15 07 00 -46.4337 51.8478 202.00 197.00 5.00 431220 CRZ 2017 05 05 09 25 00 560-99 P co CCGG 72.610 -999.990 N.. V2 2017 09 27 15 23 00 -46.4337 51.8478 202.00 197.00 5.00 431221 CRZ 2017 05 15 06 45 00 3339-99 P co CCGG 48.480 -999.990 ... V2 2017 09 28 11 30 00 -46.4337 51.8478 202.00 197.00 5.00 431174 CRZ 2017 05 15 06 45 00 3340-99 P co CCGG 48.060 -999.990 ... V2 2017 09 28 11 45 00 -46.4337 51.8478 202.00 197.00 5.00 431175 CRZ 2017 05 25 10 30 00 4677-99 P co CCGG 48.280 -999.990 ... V2 2017 09 27 15 39 00 -46.4337 51.8478 202.00 197.00 5.00 431222 CRZ 2017 05 25 10 30 00 4678-99 P co CCGG 48.020 -999.990 ... V2 2017 09 27 15 55 00 -46.4337 51.8478 202.00 197.00 5.00 431223 CRZ 2017 06 02 14 40 00 5649-99 P co CCGG 56.560 -999.990 ... V2 2017 09 27 12 44 00 -46.4337 51.8478 202.00 197.00 5.00 431202 CRZ 2017 06 02 14 40 00 703-99 P co CCGG 58.230 -999.990 ... V2 2017 09 27 12 28 00 -46.4337 51.8478 202.00 197.00 5.00 431203 CRZ 2017 06 09 11 20 00 1599-99 P co CCGG 57.740 -999.990 ... V2 2017 09 28 12 01 00 -46.4337 51.8478 202.00 197.00 5.00 431208 CRZ 2017 06 09 11 20 00 1846-99 P co CCGG 56.510 -999.990 ... V2 2017 09 28 12 17 00 -46.4337 51.8478 202.00 197.00 5.00 431209 CRZ 2017 06 16 10 30 00 1497-99 P co CCGG 57.490 -999.990 ... V2 2017 09 28 12 33 00 -46.4337 51.8478 202.00 197.00 5.00 431210 CRZ 2017 06 16 10 30 00 5295-99 P co CCGG 56.690 -999.990 ... V2 2017 09 28 12 49 00 -46.4337 51.8478 202.00 197.00 5.00 431211 CRZ 2017 06 28 06 15 00 1845-99 P co CCGG 56.780 -999.990 N.. V2 2017 09 26 17 00 00 -46.4337 51.8478 202.00 197.00 5.00 431200 CRZ 2017 06 28 06 15 00 478-99 P co CCGG 64.260 -999.990 N.. V2 2017 09 26 16 44 00 -46.4337 51.8478 202.00 197.00 5.00 431201 CRZ 2017 07 08 07 45 00 3929-99 P co CCGG 57.330 -999.990 ... V2 2017 09 28 13 21 00 -46.4337 51.8478 202.00 197.00 5.00 431212 CRZ 2017 07 08 07 45 00 836-99 P co CCGG 57.550 -999.990 ... V2 2017 09 28 13 05 00 -46.4337 51.8478 202.00 197.00 5.00 431213 CRZ 2017 07 15 08 16 00 1670-99 P co CCGG 57.710 -999.990 ... V2 2017 09 27 13 00 00 -46.4337 51.8478 202.00 197.00 5.00 431204 CRZ 2017 07 15 08 16 00 5712-99 P co CCGG 54.680 -999.990 ... V2 2017 09 27 13 16 00 -46.4337 51.8478 202.00 197.00 5.00 431205 CRZ 2017 07 22 10 15 00 5199-99 P co CCGG 66.830 -999.990 N.. V2 2017 09 27 13 48 00 -46.4337 51.8478 202.00 197.00 5.00 431206 CRZ 2017 07 22 10 15 00 590-99 P co CCGG 57.550 -999.990 ... V2 2017 09 27 13 32 00 -46.4337 51.8478 202.00 197.00 5.00 431207 CRZ 2017 07 28 06 30 00 1878-99 P co CCGG 57.330 -999.990 ... V2 2017 09 28 13 37 00 -46.4337 51.8478 202.00 197.00 5.00 431214 CRZ 2017 07 28 06 30 00 4612-99 P co CCGG 57.170 -999.990 ... V2 2017 09 28 13 52 00 -46.4337 51.8478 202.00 197.00 5.00 431215 CRZ 2017 08 05 09 30 00 330-99 P co CCGG 60.000 -999.990 ... V2 2017 12 14 11 47 00 -46.4337 51.8478 202.00 197.00 5.00 435362 CRZ 2017 08 05 09 30 00 5589-99 P co CCGG 59.190 -999.990 ... V2 2017 12 14 12 02 00 -46.4337 51.8478 202.00 197.00 5.00 435363 CRZ 2017 08 13 07 15 00 3058-99 P co CCGG 60.230 -999.990 ... V2 2017 12 12 16 47 00 -46.4337 51.8478 202.00 197.00 5.00 435378 CRZ 2017 08 13 07 15 00 4873-99 P co CCGG 58.970 -999.990 ... V2 2017 12 12 17 03 00 -46.4337 51.8478 202.00 197.00 5.00 435379 CRZ 2017 08 22 04 45 00 1029-99 P co CCGG 59.720 -999.990 ... V2 2017 12 14 12 18 00 -46.4337 51.8478 202.00 197.00 5.00 435360 CRZ 2017 08 22 04 45 00 2246-99 P co CCGG 59.930 -999.990 ... V2 2017 12 14 12 34 00 -46.4337 51.8478 202.00 197.00 5.00 435361 CRZ 2017 08 30 05 00 00 1392-99 P co CCGG 59.320 -999.990 ... V2 2017 12 14 09 24 00 -46.4337 51.8478 202.00 197.00 5.00 435376 CRZ 2017 08 30 05 00 00 5209-99 P co CCGG 59.550 -999.990 ... V2 2017 12 14 09 40 00 -46.4337 51.8478 202.00 197.00 5.00 435377 CRZ 2017 09 07 10 00 00 2564-99 P co CCGG 60.720 -999.990 ... V2 2017 12 14 12 50 00 -46.4337 51.8478 202.00 197.00 5.00 435358 CRZ 2017 09 07 10 00 00 2892-99 P co CCGG 60.160 -999.990 ... V2 2017 12 14 13 06 00 -46.4337 51.8478 202.00 197.00 5.00 435359 CRZ 2017 09 13 08 45 00 1308-99 P co CCGG 59.880 -999.990 ... V2 2017 12 14 09 56 00 -46.4337 51.8478 202.00 197.00 5.00 435374 CRZ 2017 09 13 08 45 00 2395-99 P co CCGG 59.740 -999.990 ... V2 2017 12 14 10 11 00 -46.4337 51.8478 202.00 197.00 5.00 435375 CRZ 2017 09 22 12 00 00 4071-99 P co CCGG 59.960 -999.990 ... V2 2017 12 14 11 15 00 -46.4337 51.8478 202.00 197.00 5.00 435356 CRZ 2017 09 22 12 00 00 4991-99 P co CCGG 59.980 -999.990 ... V2 2017 12 14 11 31 00 -46.4337 51.8478 202.00 197.00 5.00 435357 CRZ 2017 09 29 15 00 00 1822-99 P co CCGG 60.190 -999.990 ... V2 2017 12 14 10 43 00 -46.4337 51.8478 202.00 197.00 5.00 435373 CRZ 2017 09 29 15 00 00 194-99 P co CCGG 60.600 -999.990 ... V2 2017 12 14 10 27 00 -46.4337 51.8478 202.00 197.00 5.00 435372 CRZ 2017 10 07 10 15 00 1811-99 P co CCGG 61.040 -999.990 ... V2 2018 05 16 11 18 00 -46.4337 51.8478 202.00 197.00 5.00 443244 CRZ 2017 10 07 10 15 00 435-99 P co CCGG 61.190 -999.990 ... V2 2018 05 16 11 02 00 -46.4337 51.8478 202.00 197.00 5.00 443245 CRZ 2017 10 16 07 40 00 5192-99 P co CCGG 61.960 -999.990 ... V2 2018 05 15 17 04 00 -46.4337 51.8478 202.00 197.00 5.00 443238 CRZ 2017 10 16 07 40 00 916-99 P co CCGG 62.060 -999.990 ... V2 2018 05 15 16 48 00 -46.4337 51.8478 202.00 197.00 5.00 443239 CRZ 2017 10 28 10 20 00 1785-99 P co CCGG 63.810 -999.990 ... V2 2018 05 16 10 30 00 -46.4337 51.8478 202.00 197.00 5.00 443242 CRZ 2017 10 28 10 20 00 5550-99 P co CCGG 61.880 -999.990 ... V2 2018 05 16 10 46 00 -46.4337 51.8478 202.00 197.00 5.00 443243 CRZ 2017 11 06 09 45 00 3656-99 P co CCGG 62.280 -999.990 ... V2 2018 05 16 09 59 00 -46.4337 51.8478 202.00 197.00 5.00 443240 CRZ 2017 11 06 09 45 00 3852-99 P co CCGG 62.980 -999.990 ... V2 2018 05 16 10 15 00 -46.4337 51.8478 202.00 197.00 5.00 443241 CRZ 2017 11 20 07 06 00 2830-99 P co CCGG 60.750 -999.990 ... V2 2018 05 14 11 33 00 -46.4337 51.8478 202.00 197.00 5.00 443230 CRZ 2017 11 20 07 06 00 908-99 P co CCGG 60.470 -999.990 ... V2 2018 05 14 11 49 00 -46.4337 51.8478 202.00 197.00 5.00 443231 CRZ 2017 12 01 11 50 00 1307-99 P co CCGG 58.720 -999.990 ... V2 2018 05 14 12 04 00 -46.4337 51.8478 202.00 197.00 5.00 443232 CRZ 2017 12 01 11 50 00 869-99 P co CCGG 57.830 -999.990 ... V2 2018 05 14 12 20 00 -46.4337 51.8478 202.00 197.00 5.00 443233 CRZ 2017 12 15 11 17 00 2516-99 P co CCGG 51.800 -999.990 ... V2 2018 05 14 12 52 00 -46.4337 51.8478 202.00 197.00 5.00 443235 CRZ 2017 12 15 11 17 00 5460-99 P co CCGG 51.980 -999.990 ... V2 2018 05 14 12 36 00 -46.4337 51.8478 202.00 197.00 5.00 443234 CRZ 2017 12 28 11 50 00 5596-99 P co CCGG 50.020 -999.990 ... V2 2018 05 14 13 24 00 -46.4337 51.8478 202.00 197.00 5.00 443237 CRZ 2017 12 28 11 50 00 5711-99 P co CCGG 49.220 -999.990 ... V2 2018 05 14 13 08 00 -46.4337 51.8478 202.00 197.00 5.00 443236 CRZ 2018 01 11 13 10 00 2680-99 P co CCGG 46.890 -999.990 ... V2 2018 05 11 09 58 00 -46.4337 51.8478 202.00 197.00 5.00 443092 CRZ 2018 01 11 13 10 00 4670-99 P co CCGG 46.530 -999.990 ... V2 2018 05 11 09 42 00 -46.4337 51.8478 202.00 197.00 5.00 443093 CRZ 2018 01 22 12 18 00 206-99 P co CCGG 47.410 -999.990 ... V2 2018 05 11 10 30 00 -46.4337 51.8478 202.00 197.00 5.00 443091 CRZ 2018 01 22 12 18 00 2720-99 P co CCGG 45.260 -999.990 ... V2 2018 05 11 10 14 00 -46.4337 51.8478 202.00 197.00 5.00 443090 CRZ 2018 01 26 05 13 00 1907-99 P co CCGG 46.940 -999.990 ... V2 2018 05 11 10 46 00 -46.4337 51.8478 202.00 197.00 5.00 443094 CRZ 2018 01 26 05 13 00 3282-99 P co CCGG 46.980 -999.990 ... V2 2018 05 11 11 01 00 -46.4337 51.8478 202.00 197.00 5.00 443095 CRZ 2018 02 11 10 09 00 4658-99 P co CCGG 43.850 -999.990 ... V2 2018 05 11 11 33 00 -46.4337 51.8478 202.00 197.00 5.00 443096 CRZ 2018 02 11 10 09 00 698-99 P co CCGG 45.310 -999.990 ... V2 2018 05 11 11 17 00 -46.4337 51.8478 202.00 197.00 5.00 443097 CRZ 2018 02 21 10 30 00 253-99 P co CCGG 46.620 -999.990 ... V2 2018 05 11 11 49 00 -46.4337 51.8478 202.00 197.00 5.00 443098 CRZ 2018 02 21 10 30 00 4218-99 P co CCGG 43.350 -999.990 N.. V2 2018 05 11 12 05 00 -46.4337 51.8478 202.00 197.00 5.00 443100 CRZ 2018 02 27 11 33 00 3686-99 P co CCGG 41.610 -999.990 ... V2 2018 05 11 12 36 00 -46.4337 51.8478 202.00 197.00 5.00 443102 CRZ 2018 02 27 11 33 00 889-99 P co CCGG 41.790 -999.990 ... V2 2018 05 11 12 21 00 -46.4337 51.8478 202.00 197.00 5.00 443103 CRZ 2018 03 11 12 34 00 401-99 P co CCGG 43.590 -999.990 ... V2 2018 05 11 13 24 00 -46.4337 51.8478 202.00 197.00 5.00 443104 CRZ 2018 03 11 12 34 00 4208-99 P co CCGG 43.700 -999.990 ... V2 2018 05 11 13 40 00 -46.4337 51.8478 202.00 197.00 5.00 443105 CRZ 2018 03 18 06 31 00 1616-99 P co CCGG 43.220 -999.990 ... V2 2018 05 11 13 08 00 -46.4337 51.8478 202.00 197.00 5.00 443107 CRZ 2018 03 18 06 31 00 4310-99 P co CCGG 43.130 -999.990 ... V2 2018 05 11 12 52 00 -46.4337 51.8478 202.00 197.00 5.00 443106 CRZ 2018 04 03 12 25 00 1217-99 P co CCGG 43.820 -999.990 ... V2 2019 02 07 13 04 00 -46.4337 51.8478 202.00 197.00 5.00 453718 CRZ 2018 04 03 12 25 00 745-99 P co CCGG 44.050 -999.990 ... V2 2019 02 07 12 48 00 -46.4337 51.8478 202.00 197.00 5.00 453717 CRZ 2018 04 20 12 13 00 2834-99 P co CCGG 46.760 -999.990 ... V2 2019 02 07 13 19 00 -46.4337 51.8478 202.00 197.00 5.00 453719 CRZ 2018 04 20 12 13 00 4860-99 P co CCGG 47.020 -999.990 ... V2 2019 02 07 13 35 00 -46.4337 51.8478 202.00 197.00 5.00 453720 CRZ 2018 05 01 05 40 00 4883-99 P co CCGG 48.240 -999.990 ... V2 2019 01 31 15 11 00 -46.4337 51.8478 202.00 197.00 5.00 453506 CRZ 2018 05 01 05 40 00 5184-99 P co CCGG 47.580 -999.990 ... V2 2019 01 31 15 27 00 -46.4337 51.8478 202.00 197.00 5.00 453507 CRZ 2018 05 10 10 58 00 2151-99 P co CCGG 49.620 -999.990 ... V2 2019 02 07 14 54 00 -46.4337 51.8478 202.00 197.00 5.00 453715 CRZ 2018 05 10 10 58 00 5590-99 P co CCGG 48.870 -999.990 ... V2 2019 02 07 15 10 00 -46.4337 51.8478 202.00 197.00 5.00 453716 CRZ 2018 05 23 12 00 00 2968-99 P co CCGG 50.110 -999.990 ... V2 2019 01 31 16 30 00 -46.4337 51.8478 202.00 197.00 5.00 453502 CRZ 2018 05 23 12 00 00 965-99 P co CCGG 49.850 -999.990 ... V2 2019 01 31 16 14 00 -46.4337 51.8478 202.00 197.00 5.00 453503 CRZ 2018 06 01 12 15 00 2155-99 P co CCGG 52.150 -999.990 ... V2 2019 01 31 13 52 00 -46.4337 51.8478 202.00 197.00 5.00 453505 CRZ 2018 06 01 12 15 00 463-99 P co CCGG 53.740 -999.990 ... V2 2019 01 31 13 36 00 -46.4337 51.8478 202.00 197.00 5.00 453504 CRZ 2018 06 10 09 20 00 2280-99 P co CCGG 53.250 -999.990 ... V2 2019 01 31 15 43 00 -46.4337 51.8478 202.00 197.00 5.00 453500 CRZ 2018 06 10 09 20 00 2686-99 P co CCGG 53.040 -999.990 ... V2 2019 01 31 15 58 00 -46.4337 51.8478 202.00 197.00 5.00 453501 CRZ 2018 06 28 09 28 00 2469-99 P co CCGG 55.650 -999.990 ... V2 2019 02 04 15 59 00 -46.4337 51.8478 202.00 197.00 5.00 453590 CRZ 2018 06 28 09 28 00 2470-99 P co CCGG 55.310 -999.990 ... V2 2019 02 04 16 15 00 -46.4337 51.8478 202.00 197.00 5.00 453591 CRZ 2018 07 04 06 51 00 5327-99 P co CCGG 55.090 -999.990 ... V2 2019 02 04 16 30 00 -46.4337 51.8478 202.00 197.00 5.00 453588 CRZ 2018 07 04 06 51 00 5328-99 P co CCGG 54.680 -999.990 ... V2 2019 02 04 16 46 00 -46.4337 51.8478 202.00 197.00 5.00 453589 CRZ 2018 07 17 11 18 00 4273-99 P co CCGG 55.910 -999.990 ... V2 2019 02 04 17 02 00 -46.4337 51.8478 202.00 197.00 5.00 453586 CRZ 2018 07 17 11 18 00 4274-99 P co CCGG 55.750 -999.990 ... V2 2019 02 04 17 18 00 -46.4337 51.8478 202.00 197.00 5.00 453587 CRZ 2018 07 20 05 28 00 4945-99 P co CCGG 59.650 -999.990 ... V2 2019 02 04 17 34 00 -46.4337 51.8478 202.00 197.00 5.00 453584 CRZ 2018 07 20 05 28 00 4946-99 P co CCGG 58.860 -999.990 ... V2 2019 02 04 17 49 00 -46.4337 51.8478 202.00 197.00 5.00 453585 CRZ 2018 07 29 06 19 00 4871-99 P co CCGG 57.340 -999.990 ... V2 2019 02 01 12 42 00 -46.4337 51.8478 202.00 197.00 5.00 453582 CRZ 2018 07 29 06 19 00 4872-99 P co CCGG 57.640 -999.990 ... V2 2019 02 01 12 58 00 -46.4337 51.8478 202.00 197.00 5.00 453583 CRZ 2018 08 11 11 13 00 1749-99 P co CCGG 61.670 -999.990 ... V2 2019 02 01 13 14 00 -46.4337 51.8478 202.00 197.00 5.00 453580 CRZ 2018 08 11 11 13 00 1750-99 P co CCGG 64.190 -999.990 ... V2 2019 02 01 13 29 00 -46.4337 51.8478 202.00 197.00 5.00 453581 CRZ 2018 08 21 11 22 00 2443-99 P co CCGG 59.370 -999.990 ... V2 2019 02 01 13 45 00 -46.4337 51.8478 202.00 197.00 5.00 453578 CRZ 2018 08 21 11 22 00 2444-99 P co CCGG 59.340 -999.990 ... V2 2019 02 01 14 01 00 -46.4337 51.8478 202.00 197.00 5.00 453579 CRZ 2018 09 14 10 30 00 5123-99 P co CCGG 62.300 -999.990 ... V2 2019 02 01 14 17 00 -46.4337 51.8478 202.00 197.00 5.00 453576 CRZ 2018 09 14 10 30 00 5124-99 P co CCGG 62.710 -999.990 ... V2 2019 02 01 14 33 00 -46.4337 51.8478 202.00 197.00 5.00 453577 CRZ 2018 09 16 11 39 00 3973-99 P co CCGG 61.890 -999.990 ... V2 2019 02 04 15 11 00 -46.4337 51.8478 202.00 197.00 5.00 453659 CRZ 2018 09 16 11 39 00 4260-99 P co CCGG 62.130 -999.990 ... V2 2019 02 04 14 56 00 -46.4337 51.8478 202.00 197.00 5.00 453658 CRZ 2018 09 21 06 01 00 2459-99 P co CCGG 63.710 -999.990 ... V2 2019 02 04 14 24 00 -46.4337 51.8478 202.00 197.00 5.00 453656 CRZ 2018 09 21 06 01 00 3894-99 P co CCGG 62.800 -999.990 ... V2 2019 02 04 14 40 00 -46.4337 51.8478 202.00 197.00 5.00 453657 CRZ 2018 10 05 07 21 00 3348-99 P co CCGG 72.820 -999.990 N.. V2 2019 01 31 16 46 00 -46.4337 51.8478 202.00 197.00 5.00 453857 CRZ 2018 10 05 07 21 00 4133-99 P co CCGG 63.310 -999.990 ... V2 2019 01 31 17 02 00 -46.4337 51.8478 202.00 197.00 5.00 453858 CRZ 2018 10 16 11 35 00 5198-99 P co CCGG 66.050 -999.990 ... V2 2019 02 01 10 04 00 -46.4337 51.8478 202.00 197.00 5.00 453851 CRZ 2018 10 16 11 35 00 5348-99 P co CCGG 66.280 -999.990 ... V2 2019 02 01 10 20 00 -46.4337 51.8478 202.00 197.00 5.00 453852 CRZ 2018 10 23 06 48 00 3794-99 P co CCGG 59.410 -999.990 ... V2 2019 02 04 13 52 00 -46.4337 51.8478 202.00 197.00 5.00 453654 CRZ 2018 10 23 06 48 00 5364-99 P co CCGG 58.930 -999.990 ... V2 2019 02 04 14 08 00 -46.4337 51.8478 202.00 197.00 5.00 453655 CRZ 2018 11 01 09 58 00 5126-99 P co CCGG 56.790 -999.990 ... V2 2019 02 04 15 43 00 -46.4337 51.8478 202.00 197.00 5.00 453653 CRZ 2018 11 01 09 58 00 977-99 P co CCGG 57.340 -999.990 ... V2 2019 02 04 15 27 00 -46.4337 51.8478 202.00 197.00 5.00 453652 CRZ 2018 11 09 11 25 00 2043-99 P co CCGG 56.830 -999.990 ... V2 2019 02 01 09 01 00 -46.4337 51.8478 202.00 197.00 5.00 453855 CRZ 2018 11 09 11 25 00 3514-99 P co CCGG 59.460 -999.990 ... V2 2019 02 01 09 17 00 -46.4337 51.8478 202.00 197.00 5.00 453856 CRZ 2018 11 18 13 10 00 2439-99 P co CCGG 51.930 -999.990 ... V2 2019 02 01 09 32 00 -46.4337 51.8478 202.00 197.00 5.00 453853 CRZ 2018 11 18 13 10 00 2543-99 P co CCGG 52.740 -999.990 ... V2 2019 02 01 09 48 00 -46.4337 51.8478 202.00 197.00 5.00 453854 CRZ 2018 12 10 10 20 00 1448-99 P co CCGG 50.790 -999.990 ... AR2 2020 02 18 11 52 54 -46.4337 51.8478 202.00 197.00 5.00 470004 CRZ 2018 12 10 10 20 00 1572-99 P co CCGG 53.080 -999.990 ... AR2 2020 02 18 11 38 26 -46.4337 51.8478 202.00 197.00 5.00 470005 CRZ 2019 02 04 10 35 00 1956-99 P co CCGG 49.120 -999.990 ... AR2 2020 02 18 11 09 40 -46.4337 51.8478 202.00 197.00 5.00 470002 CRZ 2019 02 04 10 35 00 2513-99 P co CCGG 48.510 -999.990 ... AR2 2020 02 18 11 24 01 -46.4337 51.8478 202.00 197.00 5.00 470003 CRZ 2019 03 14 10 30 00 1729-99 P co CCGG 45.460 -999.990 ... AR2 2020 02 14 17 12 31 -46.4337 51.8478 202.00 197.00 5.00 470001 CRZ 2019 03 14 10 30 00 510-99 P co CCGG 45.530 -999.990 ... AR2 2020 02 14 16 58 09 -46.4337 51.8478 202.00 197.00 5.00 470000 CRZ 2019 03 28 07 00 00 2465-99 P co CCGG 46.530 -999.990 ... AR2 2020 02 14 16 29 26 -46.4337 51.8478 202.00 197.00 5.00 469998 CRZ 2019 03 28 07 00 00 4142-99 P co CCGG 46.600 -999.990 ... AR2 2020 02 14 16 43 48 -46.4337 51.8478 202.00 197.00 5.00 469999 CRZ 2019 04 05 05 25 00 4929-99 P co CCGG 48.420 -999.990 ... AR2 2020 02 12 13 29 10 -46.4337 51.8478 202.00 197.00 5.00 470260 CRZ 2019 04 05 05 25 00 5536-99 P co CCGG 47.910 -999.990 ... AR2 2020 02 12 13 43 32 -46.4337 51.8478 202.00 197.00 5.00 470261 CRZ 2019 04 20 11 01 00 3435-99 P co CCGG 48.700 -999.990 ... AR2 2020 02 12 14 12 20 -46.4337 51.8478 202.00 197.00 5.00 470283 CRZ 2019 04 20 11 01 00 788-99 P co CCGG 48.660 -999.990 ... AR2 2020 02 12 13 57 58 -46.4337 51.8478 202.00 197.00 5.00 470282 CRZ 2019 04 25 13 07 00 3120-99 P co CCGG 49.270 -999.990 ... AR2 2020 02 14 14 05 46 -46.4337 51.8478 202.00 197.00 5.00 469984 CRZ 2019 04 25 13 07 00 648-99 P co CCGG 51.360 -999.990 ... AR2 2020 02 14 14 20 07 -46.4337 51.8478 202.00 197.00 5.00 469985 CRZ 2019 05 02 13 04 00 3457-99 P co CCGG 48.140 -999.990 ... AR2 2020 02 14 14 34 29 -46.4337 51.8478 202.00 197.00 5.00 469986 CRZ 2019 05 02 13 04 00 4835-99 P co CCGG 47.760 -999.990 ... AR2 2020 02 14 14 48 53 -46.4337 51.8478 202.00 197.00 5.00 469987 CRZ 2019 05 21 04 50 00 3624-99 P co CCGG 56.230 -999.990 ... AR2 2020 02 14 13 51 24 -46.4337 51.8478 202.00 197.00 5.00 469983 CRZ 2019 05 21 04 50 00 46-99 P co CCGG 56.480 -999.990 ... AR2 2020 02 14 13 36 58 -46.4337 51.8478 202.00 197.00 5.00 469982 CRZ 2019 06 04 10 37 00 797-99 P co CCGG 55.430 -999.990 ... AR2 2020 02 14 15 46 14 -46.4337 51.8478 202.00 197.00 5.00 470021 CRZ 2019 06 13 06 47 00 3156-99 P co CCGG 54.300 -999.990 ... AR2 2020 02 14 13 22 36 -46.4337 51.8478 202.00 197.00 5.00 470015 CRZ 2019 06 13 06 47 00 3919-99 P co CCGG 53.830 -999.990 ... AR2 2020 02 14 13 08 14 -46.4337 51.8478 202.00 197.00 5.00 470014 CRZ 2019 07 03 07 16 00 370-99 P co CCGG 57.860 -999.990 ... AR2 2020 02 14 12 39 29 -46.4337 51.8478 202.00 197.00 5.00 470019 CRZ 2019 07 03 07 16 00 4367-99 P co CCGG 58.100 -999.990 ... AR2 2020 02 14 12 53 51 -46.4337 51.8478 202.00 197.00 5.00 470020 CRZ 2019 07 17 10 26 00 1300-99 P co CCGG 59.500 -999.990 ... AR2 2020 02 14 15 31 53 -46.4337 51.8478 202.00 197.00 5.00 470016 CRZ 2019 07 26 11 29 00 281-99 P co CCGG 61.100 -999.990 ... AR2 2020 02 14 12 10 44 -46.4337 51.8478 202.00 197.00 5.00 470017 CRZ 2019 07 26 11 29 00 3469-99 P co CCGG 60.460 -999.990 ... AR2 2020 02 14 12 25 06 -46.4337 51.8478 202.00 197.00 5.00 470018 CRZ 2019 08 02 10 47 00 2811-99 P co CCGG 60.830 -999.990 ... AR2 2020 02 12 13 00 21 -46.4337 51.8478 202.00 197.00 5.00 470258 CRZ 2019 08 02 10 47 00 3983-99 P co CCGG 61.280 -999.990 ... AR2 2020 02 12 13 14 46 -46.4337 51.8478 202.00 197.00 5.00 470259 CRZ 2019 08 11 08 30 00 2985-99 P co CCGG 64.670 -999.990 ... AR2 2020 02 12 11 48 23 -46.4337 51.8478 202.00 197.00 5.00 469995 CRZ 2019 08 11 08 30 00 389-99 P co CCGG 64.820 -999.990 ... AR2 2020 02 12 11 33 59 -46.4337 51.8478 202.00 197.00 5.00 469994 CRZ 2019 09 03 05 26 00 2022-99 P co CCGG 63.720 -999.990 ... AR2 2020 02 12 11 05 11 -46.4337 51.8478 202.00 197.00 5.00 469992 CRZ 2019 09 03 05 26 00 3870-99 P co CCGG 64.670 -999.990 ... AR2 2020 02 12 11 19 37 -46.4337 51.8478 202.00 197.00 5.00 469993 CRZ 2019 09 11 12 25 00 2627-99 P co CCGG 64.220 -999.990 ... AR2 2020 02 12 10 36 26 -46.4337 51.8478 202.00 197.00 5.00 469990 CRZ 2019 09 11 12 25 00 3735-99 P co CCGG 63.990 -999.990 ... AR2 2020 02 12 10 50 49 -46.4337 51.8478 202.00 197.00 5.00 469991 CRZ 2019 09 21 09 52 00 3277-99 P co CCGG 64.450 -999.990 ... AR2 2020 02 14 16 00 38 -46.4337 51.8478 202.00 197.00 5.00 469988 CRZ 2019 09 21 09 52 00 5554-99 P co CCGG 64.610 -999.990 ... AR2 2020 02 14 16 15 04 -46.4337 51.8478 202.00 197.00 5.00 469989 CRZ 2019 10 07 13 05 00 2823-99 P co CCGG 64.190 -999.990 ... AR2 2020 02 12 12 31 34 -46.4337 51.8478 202.00 197.00 5.00 470256 CRZ 2019 10 07 13 05 00 3256-99 P co CCGG 65.710 -999.990 ... AR2 2020 02 12 12 45 58 -46.4337 51.8478 202.00 197.00 5.00 470257 CRZ 2019 10 11 06 40 00 4372-99 P co CCGG 64.590 -999.990 ... AR2 2020 02 12 12 02 47 -46.4337 51.8478 202.00 197.00 5.00 469996 CRZ 2019 10 11 06 40 00 4381-99 P co CCGG 64.410 -999.990 ... AR2 2020 02 12 12 17 11 -46.4337 51.8478 202.00 197.00 5.00 469997 CRZ 2019 10 20 06 55 00 1767-99 P co CCGG 64.730 -999.990 ... AR2 2020 06 15 12 27 54 -46.4337 51.8478 202.00 197.00 5.00 475967 CRZ 2019 10 20 06 55 00 669-99 P co CCGG 64.640 -999.990 ... AR2 2020 06 15 12 13 31 -46.4337 51.8478 202.00 197.00 5.00 475966 CRZ 2019 11 01 10 20 00 5526-99 P co CCGG 62.870 -999.990 ... AR2 2020 06 15 11 59 08 -46.4337 51.8478 202.00 197.00 5.00 475965 CRZ 2019 11 01 10 20 00 972-99 P co CCGG 63.150 -999.990 ... AR2 2020 06 15 11 44 44 -46.4337 51.8478 202.00 197.00 5.00 475964 CRZ 2019 11 22 09 45 00 1559-99 P co CCGG 60.760 -999.990 ... AR2 2020 06 15 11 30 20 -46.4337 51.8478 202.00 197.00 5.00 475962 CRZ 2019 11 22 09 45 00 3206-99 P co CCGG 66.860 -999.990 N.. AR2 2020 06 15 11 16 01 -46.4337 51.8478 202.00 197.00 5.00 475963 CRZ 2019 11 29 10 32 00 212-99 P co CCGG 58.150 -999.990 ... AR2 2020 06 15 17 15 28 -46.4337 51.8478 202.00 197.00 5.00 475920 CRZ 2019 11 29 10 32 00 2339-99 P co CCGG 57.410 -999.990 ... AR2 2020 06 15 17 29 54 -46.4337 51.8478 202.00 197.00 5.00 475921 CRZ 2019 12 06 10 20 00 5057-99 P co CCGG 57.750 -999.990 ... AR2 2020 06 25 10 00 29 -46.4337 51.8478 202.00 197.00 5.00 475922 CRZ 2019 12 06 10 20 00 5502-99 P co CCGG 57.590 -999.990 ... AR2 2020 06 25 10 14 54 -46.4337 51.8478 202.00 197.00 5.00 475923 CRZ 2019 12 12 12 29 00 1297-99 P co CCGG 55.170 -999.990 ... AR2 2020 06 15 16 46 40 -46.4337 51.8478 202.00 197.00 5.00 475918 CRZ 2019 12 12 12 29 00 2099-99 P co CCGG 54.680 -999.990 ... AR2 2020 06 15 17 01 04 -46.4337 51.8478 202.00 197.00 5.00 475919 CRZ 2019 12 20 12 20 00 3205-99 P co CCGG 64.700 -999.990 ... AR2 2020 06 15 10 47 13 -46.4337 51.8478 202.00 197.00 5.00 475968 CRZ 2019 12 20 12 20 00 4499-99 P co CCGG 64.300 -999.990 ... AR2 2020 06 15 11 01 37 -46.4337 51.8478 202.00 197.00 5.00 475969 CRZ 2019 12 26 10 16 00 346-99 P co CCGG 60.630 -999.990 ... AR2 2020 06 11 11 53 22 -46.4337 51.8478 202.00 197.00 5.00 475659 CRZ 2019 12 26 10 16 00 5265-99 P co CCGG 60.120 -999.990 ... AR2 2020 06 11 12 07 45 -46.4337 51.8478 202.00 197.00 5.00 475660 CRZ 2020 01 07 10 35 00 1845-99 P co CCGG 57.610 -999.990 ... AR2 2020 06 11 11 24 40 -46.4337 51.8478 202.00 197.00 5.00 475661 CRZ 2020 01 07 10 35 00 2988-99 P co CCGG 79.100 -999.990 N.. AR2 2020 06 11 11 39 04 -46.4337 51.8478 202.00 197.00 5.00 475662 CRZ 2020 01 12 12 20 00 1737-99 P co CCGG 51.540 -999.990 ... AR2 2020 06 11 10 55 55 -46.4337 51.8478 202.00 197.00 5.00 475663 CRZ 2020 01 12 12 20 00 382-99 P co CCGG 50.830 -999.990 ... AR2 2020 06 11 11 10 18 -46.4337 51.8478 202.00 197.00 5.00 475664 CRZ 2020 01 22 11 27 00 1089-99 P co CCGG 51.050 -999.990 ... AR2 2020 06 11 10 41 35 -46.4337 51.8478 202.00 197.00 5.00 475666 CRZ 2020 01 22 11 27 00 3582-99 P co CCGG 52.550 -999.990 ... AR2 2020 06 11 10 27 10 -46.4337 51.8478 202.00 197.00 5.00 475665 CRZ 2020 01 27 03 05 00 3333-99 P co CCGG 58.020 -999.990 ... AR2 2020 06 11 17 53 19 -46.4337 51.8478 202.00 197.00 5.00 475675 CRZ 2020 01 27 03 05 00 5592-99 P co CCGG 57.200 -999.990 ... AR2 2020 06 11 17 38 56 -46.4337 51.8478 202.00 197.00 5.00 475676 CRZ 2020 01 31 06 06 00 1106-99 P co CCGG 54.210 -999.990 ... AR2 2020 06 11 17 24 31 -46.4337 51.8478 202.00 197.00 5.00 475678 CRZ 2020 01 31 06 06 00 2247-99 P co CCGG 53.940 -999.990 ... AR2 2020 06 11 17 10 07 -46.4337 51.8478 202.00 197.00 5.00 475677 CRZ 2020 02 12 06 38 00 312-99 P co CCGG 57.440 -999.990 ... AR2 2020 06 11 16 41 21 -46.4337 51.8478 202.00 197.00 5.00 475679 CRZ 2020 02 12 06 38 00 4620-99 P co CCGG 56.600 -999.990 ... AR2 2020 06 11 16 55 43 -46.4337 51.8478 202.00 197.00 5.00 475680 CRZ 2020 02 16 13 32 00 1670-99 P co CCGG 58.590 -999.990 N.. AR2 2020 06 11 16 12 36 -46.4337 51.8478 202.00 197.00 5.00 475681 CRZ 2020 02 16 13 32 00 5597-99 P co CCGG 53.510 -999.990 N.. AR2 2020 06 11 16 26 58 -46.4337 51.8478 202.00 197.00 5.00 475682 CRZ 2020 02 22 07 03 00 3155-99 P co CCGG 58.090 -999.990 ... AR2 2020 10 16 16 04 06 -46.4337 51.8478 202.00 197.00 5.00 481019 CRZ 2020 02 22 07 03 00 4811-99 P co CCGG 57.820 -999.990 ... AR2 2020 10 16 16 18 23 -46.4337 51.8478 202.00 197.00 5.00 481020 CRZ 2020 03 01 12 54 00 530-99 P co CCGG 56.460 -999.990 ... AR2 2020 10 16 15 49 48 -46.4337 51.8478 202.00 197.00 5.00 481021 CRZ 2020 03 01 12 54 00 88-99 P co CCGG 56.260 -999.990 ... AR2 2020 10 16 15 35 28 -46.4337 51.8478 202.00 197.00 5.00 481022 CRZ 2020 03 09 11 20 00 3990-99 P co CCGG 54.280 -999.990 ... AR2 2020 10 19 17 53 13 -46.4337 51.8478 202.00 197.00 5.00 481013 CRZ 2020 03 09 11 20 00 458-99 P co CCGG 53.600 -999.990 ... AR2 2020 10 19 17 38 54 -46.4337 51.8478 202.00 197.00 5.00 481014 CRZ 2020 03 17 11 58 00 1315-99 P co CCGG 55.170 -999.990 ... AR2 2020 10 19 16 41 35 -46.4337 51.8478 202.00 197.00 5.00 481009 CRZ 2020 03 17 11 58 00 1455-99 P co CCGG 54.080 -999.990 ... AR2 2020 10 19 16 55 55 -46.4337 51.8478 202.00 197.00 5.00 481010 CRZ 2020 03 21 14 04 00 2613-99 P co CCGG 52.450 -999.990 ... AR2 2020 10 16 15 06 53 -46.4337 51.8478 202.00 197.00 5.00 481017 CRZ 2020 03 21 14 04 00 5484-99 P co CCGG 51.650 -999.990 ... AR2 2020 10 16 15 21 10 -46.4337 51.8478 202.00 197.00 5.00 481018 CRZ 2020 03 28 06 17 00 1289-99 P co CCGG 52.980 -999.990 ... AR2 2020 10 16 14 38 11 -46.4337 51.8478 202.00 197.00 5.00 481015 CRZ 2020 03 28 06 17 00 1764-99 P co CCGG 52.620 -999.990 ... AR2 2020 10 16 14 52 33 -46.4337 51.8478 202.00 197.00 5.00 481016 CRZ 2020 04 17 10 27 00 4017-99 P co CCGG 59.460 -999.990 ... AR2 2020 10 19 17 10 14 -46.4337 51.8478 202.00 197.00 5.00 481011 CRZ 2020 04 17 10 27 00 5525-99 P co CCGG 58.420 -999.990 ... AR2 2020 10 19 17 24 36 -46.4337 51.8478 202.00 197.00 5.00 481012 CRZ 2020 04 20 06 25 00 1040-99 P co CCGG 56.510 -999.990 ... AR2 2020 10 19 16 13 00 -46.4337 51.8478 202.00 197.00 5.00 481007 CRZ 2020 04 20 06 25 00 2901-99 P co CCGG 55.830 -999.990 ... AR2 2020 10 19 16 27 18 -46.4337 51.8478 202.00 197.00 5.00 481008 CRZ 2020 04 24 05 20 00 227-99 P co CCGG 54.240 -999.990 ... AR2 2020 10 20 15 05 22 -46.4337 51.8478 202.00 197.00 5.00 481148 CRZ 2020 04 30 10 00 00 5363-99 P co CCGG 54.070 -999.990 ... AR2 2020 10 20 15 19 40 -46.4337 51.8478 202.00 197.00 5.00 481159 CRZ 2020 04 30 10 00 00 5671-99 P co CCGG 53.880 -999.990 ... AR2 2020 10 20 15 33 58 -46.4337 51.8478 202.00 197.00 5.00 481160 CRZ 2020 05 09 05 49 00 145-99 P co CCGG 58.150 -999.990 ... AR2 2020 10 20 14 08 07 -46.4337 51.8478 202.00 197.00 5.00 481155 CRZ 2020 05 09 05 49 00 2510-99 P co CCGG 58.220 -999.990 ... AR2 2020 10 20 14 22 26 -46.4337 51.8478 202.00 197.00 5.00 481156 CRZ 2020 05 17 12 06 00 4296-99 P co CCGG 54.850 -999.990 ... AR2 2020 10 21 10 15 20 -46.4337 51.8478 202.00 197.00 5.00 481149 CRZ 2020 05 17 12 06 00 4364-99 P co CCGG 54.460 -999.990 ... AR2 2020 10 21 10 29 39 -46.4337 51.8478 202.00 197.00 5.00 481150 CRZ 2020 05 22 06 57 00 1369-99 P co CCGG 56.840 -999.990 ... AR2 2020 10 20 13 39 30 -46.4337 51.8478 202.00 197.00 5.00 481153 CRZ 2020 05 22 06 57 00 4215-99 P co CCGG 56.620 -999.990 ... AR2 2020 10 20 13 53 49 -46.4337 51.8478 202.00 197.00 5.00 481154 CRZ 2020 05 29 06 22 00 1889-99 P co CCGG 59.000 -999.990 ... AR2 2020 10 20 14 36 44 -46.4337 51.8478 202.00 197.00 5.00 481157 CRZ 2020 05 29 06 22 00 4833-99 P co CCGG 57.580 -999.990 ... AR2 2020 10 20 14 51 03 -46.4337 51.8478 202.00 197.00 5.00 481158 CRZ 2020 06 04 06 42 00 197-99 P co CCGG 58.370 -999.990 ... AR2 2020 10 20 16 16 53 -46.4337 51.8478 202.00 197.00 5.00 481151 CRZ 2020 06 04 06 42 00 253-99 P co CCGG 58.550 -999.990 ... AR2 2020 10 20 16 31 10 -46.4337 51.8478 202.00 197.00 5.00 481152 CRZ 2020 06 14 09 42 00 4121-99 P co CCGG 58.080 -999.990 ... AR2 2020 10 20 13 25 08 -46.4337 51.8478 202.00 197.00 5.00 480998 CRZ 2020 06 14 09 42 00 576-99 P co CCGG 58.020 -999.990 ... AR2 2020 10 20 13 10 51 -46.4337 51.8478 202.00 197.00 5.00 480997 CRZ 2020 06 18 05 15 00 2196-99 P co CCGG 61.330 -999.990 ... AR2 2020 10 19 15 44 23 -46.4337 51.8478 202.00 197.00 5.00 481005 CRZ 2020 06 18 05 15 00 3914-99 P co CCGG 60.520 -999.990 ... AR2 2020 10 19 15 58 42 -46.4337 51.8478 202.00 197.00 5.00 481006 CRZ 2020 07 01 05 34 00 3506-99 P co CCGG 60.390 -999.990 ... AR2 2020 10 20 12 42 16 -46.4337 51.8478 202.00 197.00 5.00 480995 CRZ 2020 07 01 05 34 00 3744-99 P co CCGG 60.490 -999.990 ... AR2 2020 10 20 12 56 34 -46.4337 51.8478 202.00 197.00 5.00 480996 CRZ 2020 07 03 07 15 00 2452-99 P co CCGG 61.330 -999.990 ... AR2 2020 10 19 15 15 50 -46.4337 51.8478 202.00 197.00 5.00 481003 CRZ 2020 07 03 07 15 00 2989-99 P co CCGG 61.320 -999.990 ... AR2 2020 10 19 15 30 07 -46.4337 51.8478 202.00 197.00 5.00 481004 CRZ 2020 07 20 06 36 00 1068-99 P co CCGG 63.560 -999.990 ... AR2 2020 10 19 14 47 03 -46.4337 51.8478 202.00 197.00 5.00 481001 CRZ 2020 07 20 06 36 00 4616-99 P co CCGG 63.330 -999.990 ... AR2 2020 10 19 15 01 32 -46.4337 51.8478 202.00 197.00 5.00 481002 CRZ 2020 07 27 11 50 00 2139-99 P co CCGG 63.800 -999.990 ... AR2 2020 10 20 12 27 59 -46.4337 51.8478 202.00 197.00 5.00 480994 CRZ 2020 07 27 11 50 00 869-99 P co CCGG 63.460 -999.990 ... AR2 2020 10 20 12 13 42 -46.4337 51.8478 202.00 197.00 5.00 480993 CRZ 2020 07 31 07 10 00 289-99 P co CCGG 63.620 -999.990 ... AR2 2020 10 19 18 07 34 -46.4337 51.8478 202.00 197.00 5.00 480991 CRZ 2020 07 31 07 10 00 4294-99 P co CCGG 63.530 -999.990 ... AR2 2020 10 19 18 21 57 -46.4337 51.8478 202.00 197.00 5.00 480992 CRZ 2020 08 03 04 55 00 2315-99 P co CCGG 64.430 -999.990 ... AR2 2020 10 19 14 18 22 -46.4337 51.8478 202.00 197.00 5.00 480999 CRZ 2020 08 03 04 55 00 4266-99 P co CCGG 63.780 -999.990 ... AR2 2020 10 19 14 32 42 -46.4337 51.8478 202.00 197.00 5.00 481000 CRZ 2020 08 06 11 37 00 2314-99 P co CCGG 66.430 -999.990 ... AR2 2021 02 03 13 35 59 -46.4337 51.8478 202.00 197.00 5.00 485010 CRZ 2020 08 06 11 37 00 3442-99 P co CCGG 66.920 -999.990 ... AR2 2021 02 03 13 50 17 -46.4337 51.8478 202.00 197.00 5.00 485011 CRZ 2020 08 15 10 31 00 1822-99 P co CCGG 69.860 -999.990 ... AR2 2021 02 03 13 21 37 -46.4337 51.8478 202.00 197.00 5.00 485013 CRZ 2020 08 15 10 31 00 185-99 P co CCGG 69.650 -999.990 ... AR2 2021 02 03 13 07 18 -46.4337 51.8478 202.00 197.00 5.00 485012 CRZ 2020 08 21 10 17 00 169-99 P co CCGG 67.770 -999.990 ... AR2 2021 02 03 12 38 41 -46.4337 51.8478 202.00 197.00 5.00 485014 CRZ 2020 08 21 10 17 00 3063-99 P co CCGG 67.930 -999.990 ... AR2 2021 02 03 12 53 00 -46.4337 51.8478 202.00 197.00 5.00 485015 CRZ 2020 08 28 10 11 00 1321-99 P co CCGG 67.410 -999.990 ... AR2 2021 02 03 12 10 03 -46.4337 51.8478 202.00 197.00 5.00 485016 CRZ 2020 08 28 10 11 00 1901-99 P co CCGG 65.130 -999.990 ... AR2 2021 02 03 12 24 24 -46.4337 51.8478 202.00 197.00 5.00 485017 CRZ 2020 09 05 11 18 00 3866-99 P co CCGG 76.160 -999.990 ... AR2 2021 02 03 17 10 36 -46.4337 51.8478 202.00 197.00 5.00 485006 CRZ 2020 09 05 11 18 00 5403-99 P co CCGG 75.330 -999.990 ... AR2 2021 02 03 17 24 55 -46.4337 51.8478 202.00 197.00 5.00 485007 CRZ 2020 09 11 05 03 00 4776-99 P co CCGG 67.410 -999.990 ... AR2 2021 02 03 14 18 54 -46.4337 51.8478 202.00 197.00 5.00 485002 CRZ 2020 09 11 05 03 00 884-99 P co CCGG 67.460 -999.990 ... AR2 2021 02 03 14 04 36 -46.4337 51.8478 202.00 197.00 5.00 485003 CRZ 2020 09 19 07 05 00 2967-99 P co CCGG 68.270 -999.990 ... AR2 2021 02 03 17 39 13 -46.4337 51.8478 202.00 197.00 5.00 485008 CRZ 2020 09 19 07 05 00 5385-99 P co CCGG 67.810 -999.990 ... AR2 2021 02 03 17 53 32 -46.4337 51.8478 202.00 197.00 5.00 485009 CRZ 2020 09 24 12 49 00 1576-99 P co CCGG 66.800 -999.990 ... AR2 2021 02 03 16 41 59 -46.4337 51.8478 202.00 197.00 5.00 485004 CRZ 2020 09 24 12 49 00 2204-99 P co CCGG 66.330 -999.990 ... AR2 2021 02 03 16 56 18 -46.4337 51.8478 202.00 197.00 5.00 485005 CRZ 2020 10 02 05 13 00 3370-99 P co CCGG 67.200 -999.990 ... AR2 2021 02 08 14 02 51 -46.4337 51.8478 202.00 197.00 5.00 485025 CRZ 2020 10 02 05 13 00 912-99 P co CCGG 67.160 -999.990 ... AR2 2021 02 08 13 48 31 -46.4337 51.8478 202.00 197.00 5.00 485024 CRZ 2020 10 09 07 20 00 3308-99 P co CCGG 67.690 -999.990 ... AR2 2021 02 08 13 34 12 -46.4337 51.8478 202.00 197.00 5.00 485023 CRZ 2020 10 09 07 20 00 989-99 P co CCGG 67.140 -999.990 ... AR2 2021 02 08 13 19 49 -46.4337 51.8478 202.00 197.00 5.00 485022 CRZ 2020 10 18 14 00 00 193-99 P co CCGG 68.760 -999.990 N.. AR2 2021 02 08 12 51 09 -46.4337 51.8478 202.00 197.00 5.00 485020 CRZ 2020 10 18 14 00 00 3168-99 P co CCGG 72.170 -999.990 N.. AR2 2021 02 08 13 05 29 -46.4337 51.8478 202.00 197.00 5.00 485021 CRZ 2020 10 25 05 15 00 2132-99 P co CCGG 74.580 -999.990 ... AR2 2021 02 08 12 22 32 -46.4337 51.8478 202.00 197.00 5.00 485018 CRZ 2020 10 25 05 15 00 4246-99 P co CCGG 74.690 -999.990 ... AR2 2021 02 08 12 36 51 -46.4337 51.8478 202.00 197.00 5.00 485019 CRZ 2020 10 31 06 35 00 1114-99 P co CCGG 66.000 -999.990 ... AR2 2021 02 03 16 13 22 -46.4337 51.8478 202.00 197.00 5.00 485032 CRZ 2020 10 31 06 35 00 1808-99 P co CCGG 65.620 -999.990 ... AR2 2021 02 03 16 27 41 -46.4337 51.8478 202.00 197.00 5.00 485033 CRZ 2020 11 05 09 26 00 3724-99 P co CCGG 64.560 -999.990 ... AR2 2021 02 03 15 30 22 -46.4337 51.8478 202.00 197.00 5.00 485030 CRZ 2020 11 05 09 26 00 5248-99 P co CCGG 64.780 -999.990 ... AR2 2021 02 03 15 44 43 -46.4337 51.8478 202.00 197.00 5.00 485031 CRZ 2020 11 14 06 31 00 4601-99 P co CCGG 66.300 -999.990 ... AR2 2021 02 03 15 01 48 -46.4337 51.8478 202.00 197.00 5.00 485028 CRZ 2020 11 14 06 31 00 4712-99 P co CCGG 66.230 -999.990 ... AR2 2021 02 03 15 16 05 -46.4337 51.8478 202.00 197.00 5.00 485029 CRZ 2020 11 19 07 05 00 3660-99 P co CCGG 65.610 -999.990 ... AR2 2021 02 03 14 33 13 -46.4337 51.8478 202.00 197.00 5.00 485026 CRZ 2020 11 19 07 05 00 4792-99 P co CCGG 63.950 -999.990 ... AR2 2021 02 03 14 47 30 -46.4337 51.8478 202.00 197.00 5.00 485027 CRZ 2020 11 28 10 35 00 4863-99 P co CCGG 61.350 -999.990 ... AR2 2021 06 28 12 10 31 -46.4337 51.8478 202.00 197.00 5.00 490186 CRZ 2020 11 28 10 35 00 5678-99 P co CCGG 60.890 -999.990 ... AR2 2021 06 28 12 25 31 -46.4337 51.8478 202.00 197.00 5.00 490187 CRZ 2020 12 15 06 38 00 4150-99 P co CCGG 60.240 -999.990 ... AR2 2021 06 28 13 11 16 -46.4337 51.8478 202.00 197.00 5.00 490190 CRZ 2020 12 15 06 38 00 4894-99 P co CCGG 60.840 -999.990 ... AR2 2021 06 28 13 26 27 -46.4337 51.8478 202.00 197.00 5.00 490191 CRZ 2020 12 18 04 07 00 2416-99 P co CCGG 56.980 -999.990 ... AR2 2021 06 28 13 41 38 -46.4337 51.8478 202.00 197.00 5.00 490192 CRZ 2020 12 18 04 07 00 4066-99 P co CCGG 57.170 -999.990 ... AR2 2021 06 28 13 56 52 -46.4337 51.8478 202.00 197.00 5.00 490193 CRZ 2020 12 25 12 30 00 3492-99 P co CCGG 50.480 -999.990 ... AR2 2021 06 23 11 17 05 -46.4337 51.8478 202.00 197.00 5.00 490142 CRZ 2020 12 25 12 30 00 4489-99 P co CCGG 50.270 -999.990 ... AR2 2021 06 23 11 32 02 -46.4337 51.8478 202.00 197.00 5.00 490143