# number_of_header_lines: 69 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO CCGG (Individual Flasks) # contact_name: Gabrielle Petron # contact_telephone: (303) 497-4890 # contact_email: Gabrielle.Petron@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Deutscher Wetterdienst [DWD] # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: hpb # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2020-12-31 # description_creation-time: 2021-07-29 08:18:03 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number HPB 2006 04 06 11 55 00 451-99 G co CCGG 193.940 -999.990 ... R5 2006 05 02 09 46 00 47.8011 11.0245 941.00 936.00 5.00 215902 HPB 2006 04 06 11 55 00 452-99 G co CCGG 194.020 -999.990 ... R5 2006 05 02 10 00 00 47.8011 11.0245 941.00 936.00 5.00 215903 HPB 2006 04 11 12 14 00 3369-99 G co CCGG 193.730 -999.990 ... R5 2006 05 02 10 14 00 47.8011 11.0245 941.00 936.00 5.00 215904 HPB 2006 04 11 12 14 00 3370-99 G co CCGG 192.820 -999.990 ... R5 2006 05 02 10 29 00 47.8011 11.0245 941.00 936.00 5.00 215905 HPB 2006 04 19 11 55 00 2129-99 G co CCGG 177.330 -999.990 ... R5 2006 05 23 14 15 00 47.8011 11.0245 941.00 936.00 5.00 216807 HPB 2006 04 19 11 55 00 2130-99 G co CCGG 176.790 -999.990 ... R5 2006 05 23 14 29 00 47.8011 11.0245 941.00 936.00 5.00 216808 HPB 2006 04 24 11 55 00 1823-99 G co CCGG 155.190 -999.990 ... R5 2006 05 23 14 43 00 47.8011 11.0245 941.00 936.00 5.00 216809 HPB 2006 04 24 11 55 00 1824-99 G co CCGG 156.180 -999.990 ... R5 2006 05 23 14 58 00 47.8011 11.0245 941.00 936.00 5.00 216810 HPB 2006 05 02 11 55 00 1807-99 G co CCGG 147.190 -999.990 ... R5 2006 06 05 14 03 00 47.8011 11.0245 941.00 936.00 5.00 217489 HPB 2006 05 02 11 55 00 1808-99 G co CCGG 146.030 -999.990 ... R5 2006 06 05 14 17 00 47.8011 11.0245 941.00 936.00 5.00 217490 HPB 2006 05 08 11 55 00 3845-99 G co CCGG 198.780 -999.990 ... R5 2006 06 05 13 34 00 47.8011 11.0245 941.00 936.00 5.00 217313 HPB 2006 05 08 11 55 00 3846-99 G co CCGG 199.010 -999.990 ... R5 2006 06 05 13 48 00 47.8011 11.0245 941.00 936.00 5.00 217314 HPB 2006 05 15 11 55 00 2929-99 G co CCGG 137.820 -999.990 ... R5 2006 06 26 08 53 00 47.8011 11.0245 941.00 936.00 5.00 218089 HPB 2006 05 15 11 55 00 2930-99 G co CCGG 138.090 -999.990 ... R5 2006 06 26 09 07 00 47.8011 11.0245 941.00 936.00 5.00 218090 HPB 2006 05 22 11 55 00 435-99 G co CCGG 119.350 -999.990 ... R5 2006 06 26 09 21 00 47.8011 11.0245 941.00 936.00 5.00 218091 HPB 2006 05 22 11 55 00 436-99 G co CCGG 118.280 -999.990 ... R5 2006 06 26 09 35 00 47.8011 11.0245 941.00 936.00 5.00 218092 HPB 2006 05 30 11 55 00 2509-99 G co CCGG 146.410 -999.990 ... R5 2006 07 11 16 49 00 47.8011 11.0245 941.00 936.00 5.00 218747 HPB 2006 05 30 11 55 00 2510-99 G co CCGG 145.820 -999.990 ... R5 2006 07 11 17 03 00 47.8011 11.0245 941.00 936.00 5.00 218748 HPB 2006 06 06 11 55 00 189-99 G co CCGG 143.250 -999.990 ... R5 2006 07 12 09 22 00 47.8011 11.0245 941.00 936.00 5.00 218745 HPB 2006 06 06 11 55 00 190-99 G co CCGG 142.430 -999.990 ... R5 2006 07 12 09 36 00 47.8011 11.0245 941.00 936.00 5.00 218746 HPB 2006 06 12 11 55 00 4143-99 G co CCGG 147.220 -999.990 ... R5 2006 07 25 16 36 00 47.8011 11.0245 941.00 936.00 5.00 219487 HPB 2006 06 12 11 55 00 4144-99 G co CCGG 146.420 -999.990 ... R5 2006 07 25 16 50 00 47.8011 11.0245 941.00 936.00 5.00 219488 HPB 2006 06 20 11 55 00 3191-99 G co CCGG 124.970 -999.990 ... R5 2006 07 25 16 07 00 47.8011 11.0245 941.00 936.00 5.00 219485 HPB 2006 06 20 11 55 00 3192-99 G co CCGG 124.300 -999.990 ... R5 2006 07 25 16 21 00 47.8011 11.0245 941.00 936.00 5.00 219486 HPB 2006 07 03 12 00 00 6023-66 G co CCGG 159.510 -999.990 ... R5 2006 08 16 12 48 00 47.8011 11.0245 941.00 936.00 5.00 220415 HPB 2006 07 03 12 00 00 6024-66 G co CCGG 159.900 -999.990 ... R5 2006 08 16 13 02 00 47.8011 11.0245 941.00 936.00 5.00 220416 HPB 2006 07 11 11 55 00 4203-99 G co CCGG 139.700 -999.990 ... R5 2006 08 16 11 23 00 47.8011 11.0245 941.00 936.00 5.00 220413 HPB 2006 07 11 11 55 00 4204-99 G co CCGG 140.180 -999.990 ... R5 2006 08 16 11 37 00 47.8011 11.0245 941.00 936.00 5.00 220414 HPB 2006 07 17 11 56 00 545-99 G co CCGG 111.520 -999.990 ... R5 2006 08 24 15 38 00 47.8011 11.0245 941.00 936.00 5.00 220925 HPB 2006 07 24 11 52 00 1355-99 G co CCGG 130.320 -999.990 ... R5 2006 08 24 15 10 00 47.8011 11.0245 941.00 936.00 5.00 220926 HPB 2006 07 24 11 52 00 1356-99 G co CCGG 130.200 -999.990 ... R5 2006 08 24 15 24 00 47.8011 11.0245 941.00 936.00 5.00 220927 HPB 2006 07 31 11 55 00 1899-99 G co CCGG 110.760 -999.990 ... R5 2006 09 07 09 55 00 47.8011 11.0245 941.00 936.00 5.00 221695 HPB 2006 07 31 11 55 00 1900-99 G co CCGG 112.230 -999.990 ... R5 2006 09 07 10 10 00 47.8011 11.0245 941.00 936.00 5.00 221696 HPB 2006 08 07 11 55 00 4591-99 G co CCGG 144.470 -999.990 ... R5 2006 09 07 10 24 00 47.8011 11.0245 941.00 936.00 5.00 221693 HPB 2006 08 07 11 55 00 4592-99 G co CCGG 144.850 -999.990 ... R5 2006 09 07 10 38 00 47.8011 11.0245 941.00 936.00 5.00 221694 HPB 2006 08 16 11 55 00 1677-99 G co CCGG 148.310 -999.990 ... R5 2006 09 25 14 54 00 47.8011 11.0245 941.00 936.00 5.00 222437 HPB 2006 08 16 11 55 00 1678-99 G co CCGG 148.520 -999.990 ... R5 2006 09 25 15 08 00 47.8011 11.0245 941.00 936.00 5.00 222438 HPB 2006 08 21 11 55 00 4173-99 G co CCGG 113.070 -999.990 ... R5 2006 09 25 13 29 00 47.8011 11.0245 941.00 936.00 5.00 222435 HPB 2006 08 21 11 55 00 4174-99 G co CCGG 112.160 -999.990 ... R5 2006 09 25 13 43 00 47.8011 11.0245 941.00 936.00 5.00 222436 HPB 2006 08 28 11 55 00 1807-99 G co CCGG 117.660 -999.990 ... R5 2006 10 12 11 35 00 47.8011 11.0245 941.00 936.00 5.00 223446 HPB 2006 08 28 11 55 00 1808-99 G co CCGG 117.190 -999.990 ... R5 2006 10 12 11 49 00 47.8011 11.0245 941.00 936.00 5.00 223447 HPB 2006 09 04 11 55 00 573-99 G co CCGG 98.090 -999.990 ... R5 2006 10 12 12 03 00 47.8011 11.0245 941.00 936.00 5.00 223444 HPB 2006 09 04 11 55 00 574-99 G co CCGG 98.860 -999.990 ... R5 2006 10 12 12 18 00 47.8011 11.0245 941.00 936.00 5.00 223445 HPB 2006 09 11 11 55 00 991-99 G co CCGG 148.330 -999.990 ... R5 2006 10 12 10 30 00 47.8011 11.0245 941.00 936.00 5.00 223442 HPB 2006 09 11 11 55 00 992-99 G co CCGG 150.580 -999.990 ... R5 2006 10 12 10 45 00 47.8011 11.0245 941.00 936.00 5.00 223443 HPB 2006 09 18 11 55 00 1835-99 G co CCGG 168.640 -999.990 ... R5 2006 10 12 10 59 00 47.8011 11.0245 941.00 936.00 5.00 223440 HPB 2006 09 18 11 55 00 1836-99 G co CCGG 168.580 -999.990 ... R5 2006 10 12 11 13 00 47.8011 11.0245 941.00 936.00 5.00 223441 HPB 2006 09 27 11 55 00 3529-99 G co CCGG 170.190 -999.990 ... R5 2006 10 30 14 29 00 47.8011 11.0245 941.00 936.00 5.00 224108 HPB 2006 09 27 11 55 00 3530-99 G co CCGG 172.220 -999.990 ... R5 2006 10 30 14 43 00 47.8011 11.0245 941.00 936.00 5.00 224109 HPB 2006 10 05 11 54 00 123-99 G co CCGG 114.060 -999.990 ... R5 2006 10 30 14 00 00 47.8011 11.0245 941.00 936.00 5.00 224106 HPB 2006 10 05 11 54 00 124-99 G co CCGG 114.590 -999.990 ... R5 2006 10 30 14 15 00 47.8011 11.0245 941.00 936.00 5.00 224107 HPB 2006 10 11 11 55 00 881-99 G co CCGG 147.160 -999.990 ... R5 2006 11 13 13 08 00 47.8011 11.0245 941.00 936.00 5.00 224800 HPB 2006 10 11 11 55 00 882-99 G co CCGG 147.710 -999.990 ... R5 2006 11 13 13 22 00 47.8011 11.0245 941.00 936.00 5.00 224801 HPB 2006 10 16 12 07 00 3711-99 G co CCGG 201.620 -999.990 .X. R5 2006 11 13 12 39 00 47.8011 11.0245 941.00 936.00 5.00 224798 HPB 2006 10 16 12 07 00 3712-99 G co CCGG 202.750 -999.990 .X. R5 2006 11 13 12 53 00 47.8011 11.0245 941.00 936.00 5.00 224799 HPB 2006 10 24 11 55 00 2541-99 G co CCGG 122.570 -999.990 ... R5 2006 11 27 14 10 00 47.8011 11.0245 941.00 936.00 5.00 225303 HPB 2006 10 24 11 55 00 2542-99 G co CCGG 122.220 -999.990 ... R5 2006 11 27 14 24 00 47.8011 11.0245 941.00 936.00 5.00 225304 HPB 2006 10 31 11 55 00 4091-99 G co CCGG 124.520 -999.990 ... R5 2006 11 27 13 41 00 47.8011 11.0245 941.00 936.00 5.00 225301 HPB 2006 10 31 11 55 00 4092-99 G co CCGG 124.040 -999.990 ... R5 2006 11 27 13 56 00 47.8011 11.0245 941.00 936.00 5.00 225302 HPB 2006 11 06 11 55 00 3907-99 G co CCGG 141.770 -999.990 ... R5 2006 12 12 10 10 00 47.8011 11.0245 941.00 936.00 5.00 226141 HPB 2006 11 06 11 55 00 3908-99 G co CCGG 141.110 -999.990 ... R5 2006 12 12 10 24 00 47.8011 11.0245 941.00 936.00 5.00 226142 HPB 2006 11 13 11 55 00 3477-99 G co CCGG 126.790 -999.990 ... R5 2006 12 12 10 38 00 47.8011 11.0245 941.00 936.00 5.00 226143 HPB 2006 11 13 11 55 00 3478-99 G co CCGG 126.280 -999.990 ... R5 2006 12 12 10 53 00 47.8011 11.0245 941.00 936.00 5.00 226144 HPB 2006 11 20 11 55 00 2911-99 G co CCGG 151.050 -999.990 ... R5 2007 02 20 12 02 00 47.8011 11.0245 941.00 936.00 5.00 229101 HPB 2006 11 20 11 55 00 2912-99 G co CCGG 151.760 -999.990 ... R5 2007 02 20 12 17 00 47.8011 11.0245 941.00 936.00 5.00 229102 HPB 2006 11 27 11 55 00 6665-66 G co CCGG 153.070 -999.990 ... R5 2007 02 20 10 37 00 47.8011 11.0245 941.00 936.00 5.00 229099 HPB 2006 11 27 11 55 00 6666-66 G co CCGG 152.330 -999.990 ... R5 2007 02 20 10 51 00 47.8011 11.0245 941.00 936.00 5.00 229100 HPB 2006 12 04 11 55 00 4539-99 G co CCGG 142.330 -999.990 ... R5 2007 02 06 09 45 00 47.8011 11.0245 941.00 936.00 5.00 228157 HPB 2006 12 04 11 55 00 4540-99 G co CCGG 141.600 -999.990 ... R5 2007 02 06 09 59 00 47.8011 11.0245 941.00 936.00 5.00 228158 HPB 2006 12 13 11 55 00 3363-99 G co CCGG 171.240 -999.990 ... R5 2007 02 06 10 42 00 47.8011 11.0245 941.00 936.00 5.00 228155 HPB 2006 12 13 11 55 00 3364-99 G co CCGG 170.860 -999.990 ... R5 2007 02 06 10 56 00 47.8011 11.0245 941.00 936.00 5.00 228156 HPB 2006 12 18 11 55 00 4085-99 G co CCGG 205.040 -999.990 ... R5 2007 01 23 08 45 00 47.8011 11.0245 941.00 936.00 5.00 228175 HPB 2006 12 18 11 55 00 4086-99 G co CCGG 206.030 -999.990 ... R5 2007 01 23 08 59 00 47.8011 11.0245 941.00 936.00 5.00 228176 HPB 2006 12 27 11 55 00 2763-99 G co CCGG 143.880 -999.990 ... R5 2007 02 06 12 08 00 47.8011 11.0245 941.00 936.00 5.00 228163 HPB 2006 12 27 11 55 00 2764-99 G co CCGG 141.400 -999.990 ... R5 2007 02 06 12 22 00 47.8011 11.0245 941.00 936.00 5.00 228164 HPB 2007 01 02 11 55 00 3535-99 G co CCGG 151.400 -999.990 ... R5 2007 02 06 12 36 00 47.8011 11.0245 941.00 936.00 5.00 228165 HPB 2007 01 02 11 55 00 3536-99 G co CCGG 151.330 -999.990 ... R5 2007 02 06 12 50 00 47.8011 11.0245 941.00 936.00 5.00 228166 HPB 2007 01 08 12 34 56 2903-99 G co CCGG 152.070 -999.990 ... R5 2007 02 14 14 05 00 47.8011 11.0245 941.00 936.00 5.00 229027 HPB 2007 01 08 12 34 56 2904-99 G co CCGG 150.410 -999.990 ... R5 2007 02 14 14 20 00 47.8011 11.0245 941.00 936.00 5.00 229028 HPB 2007 01 16 11 55 00 4129-99 G co CCGG 188.290 -999.990 ... R5 2007 02 14 13 37 00 47.8011 11.0245 941.00 936.00 5.00 229025 HPB 2007 01 16 11 55 00 4130-99 G co CCGG 185.940 -999.990 ... R5 2007 02 14 13 51 00 47.8011 11.0245 941.00 936.00 5.00 229026 HPB 2007 01 30 11 55 00 4645-99 G co CCGG 190.890 -999.990 ... R5 2007 03 15 14 06 00 47.8011 11.0245 941.00 936.00 5.00 230469 HPB 2007 01 30 11 55 00 4646-99 G co CCGG 190.830 -999.990 ... R5 2007 03 15 14 20 00 47.8011 11.0245 941.00 936.00 5.00 230470 HPB 2007 02 05 11 55 00 1951-99 G co CCGG 170.500 -999.990 ... R5 2007 03 15 13 37 00 47.8011 11.0245 941.00 936.00 5.00 230467 HPB 2007 02 05 11 55 00 1952-99 G co CCGG 171.250 -999.990 ... R5 2007 03 15 13 52 00 47.8011 11.0245 941.00 936.00 5.00 230468 HPB 2007 02 12 11 55 00 687-99 G co CCGG 145.790 -999.990 ... R5 2007 03 28 13 04 00 47.8011 11.0245 941.00 936.00 5.00 231313 HPB 2007 02 12 11 55 00 688-99 G co CCGG 146.960 -999.990 ... R5 2007 03 28 13 18 00 47.8011 11.0245 941.00 936.00 5.00 231314 HPB 2007 02 19 11 55 00 2641-99 G co CCGG 263.180 -999.990 .XC R5 2007 03 28 13 33 00 47.8011 11.0245 941.00 936.00 5.00 231315 HPB 2007 02 19 11 55 00 2642-99 G co CCGG 262.590 -999.990 .XC R5 2007 03 28 13 47 00 47.8011 11.0245 941.00 936.00 5.00 231316 HPB 2007 02 26 11 55 00 311-99 G co CCGG 186.180 -999.990 ... R5 2007 04 12 12 54 00 47.8011 11.0245 941.00 936.00 5.00 232139 HPB 2007 02 26 11 55 00 312-99 G co CCGG 186.420 -999.990 ... R5 2007 04 12 13 09 00 47.8011 11.0245 941.00 936.00 5.00 232140 HPB 2007 03 05 11 55 00 3553-99 G co CCGG 165.660 -999.990 ... R5 2007 04 12 12 26 00 47.8011 11.0245 941.00 936.00 5.00 232141 HPB 2007 03 05 11 55 00 3554-99 G co CCGG 165.130 -999.990 ... R5 2007 04 12 12 40 00 47.8011 11.0245 941.00 936.00 5.00 232142 HPB 2007 03 12 11 55 00 6097-66 G co CCGG 198.310 -999.990 ... R5 2007 04 23 09 47 00 47.8011 11.0245 941.00 936.00 5.00 232573 HPB 2007 03 12 11 55 00 6098-66 G co CCGG 197.390 -999.990 ... R5 2007 04 23 10 01 00 47.8011 11.0245 941.00 936.00 5.00 232574 HPB 2007 03 20 11 55 00 1121-99 G co CCGG 202.470 -999.990 ... R5 2007 04 23 11 12 00 47.8011 11.0245 941.00 936.00 5.00 232571 HPB 2007 03 20 11 55 00 1122-99 G co CCGG 202.430 -999.990 ... R5 2007 04 23 11 27 00 47.8011 11.0245 941.00 936.00 5.00 232572 HPB 2007 03 27 11 55 00 2635-99 G co CCGG 207.210 -999.990 ... R5 2007 04 30 14 17 00 47.8011 11.0245 941.00 936.00 5.00 232977 HPB 2007 03 27 11 55 00 2636-99 G co CCGG 207.160 -999.990 ... R5 2007 04 30 14 31 00 47.8011 11.0245 941.00 936.00 5.00 232978 HPB 2007 04 02 11 55 00 2739-99 G co CCGG 224.910 -999.990 ... R5 2007 04 30 14 46 00 47.8011 11.0245 941.00 936.00 5.00 232991 HPB 2007 04 02 11 55 00 2740-99 G co CCGG 224.110 -999.990 ... R5 2007 04 30 15 00 00 47.8011 11.0245 941.00 936.00 5.00 232992 HPB 2007 04 11 11 55 00 25-99 G co CCGG 182.850 -999.990 ... R5 2007 05 21 12 26 00 47.8011 11.0245 941.00 936.00 5.00 234223 HPB 2007 04 11 11 55 00 26-99 G co CCGG 183.070 -999.990 ... R5 2007 05 21 12 40 00 47.8011 11.0245 941.00 936.00 5.00 234224 HPB 2007 04 16 11 55 00 2149-99 G co CCGG 172.620 -999.990 ... R6 2007 05 21 11 22 00 47.8011 11.0245 941.00 936.00 5.00 234221 HPB 2007 04 16 11 55 00 2150-99 G co CCGG 172.960 -999.990 ... R6 2007 05 21 11 37 00 47.8011 11.0245 941.00 936.00 5.00 234222 HPB 2007 04 23 11 51 00 3327-99 G co CCGG 148.670 -999.990 ... R6 2007 05 21 13 48 00 47.8011 11.0245 941.00 936.00 5.00 234227 HPB 2007 04 23 11 51 00 3328-99 G co CCGG 148.460 -999.990 ... R6 2007 05 21 14 03 00 47.8011 11.0245 941.00 936.00 5.00 234228 HPB 2007 04 30 11 55 00 3765-99 G co CCGG 170.460 -999.990 ... R5 2007 05 21 13 51 00 47.8011 11.0245 941.00 936.00 5.00 234225 HPB 2007 04 30 11 55 00 3766-99 G co CCGG 170.170 -999.990 ... R5 2007 05 21 14 05 00 47.8011 11.0245 941.00 936.00 5.00 234226 HPB 2007 05 07 11 55 00 1415-99 G co CCGG 172.270 -999.990 ... R5 2007 06 11 10 32 00 47.8011 11.0245 941.00 936.00 5.00 235312 HPB 2007 05 07 11 55 00 1416-99 G co CCGG 172.470 -999.990 ... R5 2007 06 11 10 46 00 47.8011 11.0245 941.00 936.00 5.00 235313 HPB 2007 05 14 11 55 00 2085-99 G co CCGG 164.860 -999.990 ... R5 2007 06 11 13 22 00 47.8011 11.0245 941.00 936.00 5.00 235310 HPB 2007 05 14 11 55 00 2086-99 G co CCGG 164.870 -999.990 ... R5 2007 06 11 13 37 00 47.8011 11.0245 941.00 936.00 5.00 235311 HPB 2007 05 21 11 55 00 2969-99 G co CCGG 155.730 -999.990 ... R5 2007 07 02 13 51 00 47.8011 11.0245 941.00 936.00 5.00 237163 HPB 2007 05 21 11 55 00 2970-99 G co CCGG 155.300 -999.990 ... R5 2007 07 02 14 05 00 47.8011 11.0245 941.00 936.00 5.00 237164 HPB 2007 05 30 11 55 00 4409-99 G co CCGG 134.790 -999.990 ... R5 2007 07 02 14 19 00 47.8011 11.0245 941.00 936.00 5.00 237161 HPB 2007 05 30 11 55 00 4410-99 G co CCGG 135.070 -999.990 ... R5 2007 07 02 14 33 00 47.8011 11.0245 941.00 936.00 5.00 237162 HPB 2007 06 04 11 55 00 855-99 G co CCGG 150.390 -999.990 ... R6 2007 07 30 16 29 00 47.8011 11.0245 941.00 936.00 5.00 238900 HPB 2007 06 04 11 55 00 856-99 G co CCGG 150.090 -999.990 ... R6 2007 07 30 16 43 00 47.8011 11.0245 941.00 936.00 5.00 238901 HPB 2007 06 12 12 24 00 3193-99 G co CCGG 151.300 -999.990 ... R6 2007 07 30 16 58 00 47.8011 11.0245 941.00 936.00 5.00 238902 HPB 2007 06 12 12 24 00 3194-99 G co CCGG 152.640 -999.990 ... R6 2007 07 30 17 12 00 47.8011 11.0245 941.00 936.00 5.00 238903 HPB 2007 06 18 11 55 00 3031-99 G co CCGG 106.890 -999.990 ... R5 2007 07 24 12 54 00 47.8011 11.0245 941.00 936.00 5.00 238557 HPB 2007 06 18 11 55 00 3032-99 G co CCGG 107.120 -999.990 ... R5 2007 07 24 13 08 00 47.8011 11.0245 941.00 936.00 5.00 238558 HPB 2007 06 27 11 55 00 1139-99 G co CCGG 104.340 -999.990 ... R5 2007 07 24 11 57 00 47.8011 11.0245 941.00 936.00 5.00 238559 HPB 2007 06 27 11 55 00 1140-99 G co CCGG 103.740 -999.990 ... R5 2007 07 24 12 11 00 47.8011 11.0245 941.00 936.00 5.00 238560 HPB 2007 07 02 11 55 00 1335-99 G co CCGG 108.200 -999.990 ... R5 2007 08 01 10 30 00 47.8011 11.0245 941.00 936.00 5.00 239239 HPB 2007 07 02 11 55 00 1336-99 G co CCGG 108.210 -999.990 ... R5 2007 08 01 10 45 00 47.8011 11.0245 941.00 936.00 5.00 239240 HPB 2007 07 10 11 55 00 2077-99 G co CCGG 100.680 -999.990 ... R5 2007 08 01 13 21 00 47.8011 11.0245 941.00 936.00 5.00 239237 HPB 2007 07 10 11 55 00 2078-99 G co CCGG 100.080 -999.990 ... R5 2007 08 01 13 35 00 47.8011 11.0245 941.00 936.00 5.00 239238 HPB 2007 07 16 11 55 00 3841-99 G co CCGG 121.500 -999.990 ... R5 2007 08 08 14 42 00 47.8011 11.0245 941.00 936.00 5.00 239668 HPB 2007 07 16 11 55 00 3842-99 G co CCGG 121.020 -999.990 ... R5 2007 08 08 14 56 00 47.8011 11.0245 941.00 936.00 5.00 239669 HPB 2007 07 23 11 55 00 1823-99 G co CCGG 115.990 -999.990 ... R5 2007 08 08 15 10 00 47.8011 11.0245 941.00 936.00 5.00 239670 HPB 2007 07 23 11 55 00 1824-99 G co CCGG 116.500 -999.990 ... R5 2007 08 08 15 24 00 47.8011 11.0245 941.00 936.00 5.00 239671 HPB 2007 07 31 11 55 00 4585-99 G co CCGG 114.770 -999.990 ... R5 2007 08 30 11 00 00 47.8011 11.0245 941.00 936.00 5.00 240641 HPB 2007 07 31 11 55 00 4586-99 G co CCGG 114.280 -999.990 ... R5 2007 08 30 11 14 00 47.8011 11.0245 941.00 936.00 5.00 240642 HPB 2007 08 07 11 55 00 221-99 G co CCGG 170.330 -999.990 ... R5 2007 08 30 10 32 00 47.8011 11.0245 941.00 936.00 5.00 240639 HPB 2007 08 07 11 55 00 222-99 G co CCGG 169.970 -999.990 ... R5 2007 08 30 10 46 00 47.8011 11.0245 941.00 936.00 5.00 240640 HPB 2007 08 14 12 07 00 1365-99 G co CCGG 142.760 -999.990 ... R5 2007 09 14 13 43 00 47.8011 11.0245 941.00 936.00 5.00 241383 HPB 2007 08 14 12 07 00 2865-99 G co CCGG 142.690 -999.990 ... R5 2007 09 14 13 57 00 47.8011 11.0245 941.00 936.00 5.00 241384 HPB 2007 08 21 11 33 00 2506-99 G co CCGG 116.330 -999.990 ... R5 2007 09 14 13 15 00 47.8011 11.0245 941.00 936.00 5.00 241386 HPB 2007 08 21 11 33 00 3369-99 G co CCGG 116.710 -999.990 ... R5 2007 09 14 13 01 00 47.8011 11.0245 941.00 936.00 5.00 241385 HPB 2007 08 27 11 55 00 23-99 G co CCGG 156.900 -999.990 ... R5 2007 09 24 12 01 00 47.8011 11.0245 941.00 936.00 5.00 242063 HPB 2007 08 27 11 55 00 24-99 G co CCGG 156.570 -999.990 ... R5 2007 09 24 12 15 00 47.8011 11.0245 941.00 936.00 5.00 242064 HPB 2007 09 03 11 55 00 3491-99 G co CCGG 125.170 -999.990 ... R5 2007 09 24 09 39 00 47.8011 11.0245 941.00 936.00 5.00 242065 HPB 2007 09 03 11 55 00 3492-99 G co CCGG 125.310 -999.990 ... R5 2007 09 24 09 53 00 47.8011 11.0245 941.00 936.00 5.00 242066 HPB 2007 09 10 11 55 00 2941-99 G co CCGG 129.980 -999.990 ... R5 2007 10 10 10 11 00 47.8011 11.0245 941.00 936.00 5.00 242951 HPB 2007 09 10 11 55 00 2942-99 G co CCGG 129.650 -999.990 ... R5 2007 10 10 10 26 00 47.8011 11.0245 941.00 936.00 5.00 242952 HPB 2007 09 17 11 55 00 4785-99 G co CCGG 145.660 -999.990 ... R5 2007 10 10 10 40 00 47.8011 11.0245 941.00 936.00 5.00 242949 HPB 2007 09 17 11 55 00 4786-99 G co CCGG 145.490 -999.990 ... R5 2007 10 10 10 54 00 47.8011 11.0245 941.00 936.00 5.00 242950 HPB 2007 09 24 11 55 00 3347-99 G co CCGG 165.770 -999.990 ... R5 2007 11 01 14 16 00 47.8011 11.0245 941.00 936.00 5.00 244040 HPB 2007 09 24 11 55 00 3370-99 G co CCGG 164.750 -999.990 ... R5 2007 11 01 14 31 00 47.8011 11.0245 941.00 936.00 5.00 244041 HPB 2007 10 01 11 55 00 1976-99 G co CCGG 118.480 -999.990 ... R5 2007 11 01 13 48 00 47.8011 11.0245 941.00 936.00 5.00 244042 HPB 2007 10 01 11 55 00 4411-99 G co CCGG 117.760 -999.990 ... R5 2007 11 01 14 02 00 47.8011 11.0245 941.00 936.00 5.00 244043 HPB 2007 10 09 11 55 00 265-99 G co CCGG 179.820 -999.990 ... R5 2007 11 05 13 12 00 47.8011 11.0245 941.00 936.00 5.00 244265 HPB 2007 10 09 11 55 00 4432-99 G co CCGG 179.390 -999.990 ... R5 2007 11 05 13 26 00 47.8011 11.0245 941.00 936.00 5.00 244266 HPB 2007 10 15 11 55 00 376-99 G co CCGG 151.580 -999.990 ... R5 2007 11 05 12 58 00 47.8011 11.0245 941.00 936.00 5.00 244264 HPB 2007 10 15 11 55 00 73-99 G co CCGG 151.680 -999.990 ... R5 2007 11 05 12 43 00 47.8011 11.0245 941.00 936.00 5.00 244263 HPB 2007 10 22 11 55 00 2444-99 G co CCGG 185.770 -999.990 ... R5 2007 11 16 13 01 00 47.8011 11.0245 941.00 936.00 5.00 245015 HPB 2007 10 22 11 55 00 970-99 G co CCGG 185.660 -999.990 ... R5 2007 11 16 12 47 00 47.8011 11.0245 941.00 936.00 5.00 245016 HPB 2007 10 30 11 55 00 4725-99 G co CCGG 183.870 -999.990 ... R5 2007 11 16 12 33 00 47.8011 11.0245 941.00 936.00 5.00 245014 HPB 2007 10 30 11 55 00 598-99 G co CCGG 184.300 -999.990 ... R5 2007 11 16 12 19 00 47.8011 11.0245 941.00 936.00 5.00 245013 HPB 2007 11 05 12 45 00 3614-99 G co CCGG 157.150 -999.990 ... R5 2008 01 02 12 16 00 47.8011 11.0245 941.00 936.00 5.00 246991 HPB 2007 11 05 12 45 00 4628-99 G co CCGG 156.630 -999.990 ... R5 2008 01 02 12 31 00 47.8011 11.0245 941.00 936.00 5.00 246992 HPB 2007 11 13 11 48 00 2844-99 G co CCGG 141.950 -999.990 ... R5 2007 12 28 11 57 00 47.8011 11.0245 941.00 936.00 5.00 246993 HPB 2007 11 13 11 48 00 3345-99 G co CCGG 139.450 -999.990 ... R5 2007 12 28 12 12 00 47.8011 11.0245 941.00 936.00 5.00 246994 HPB 2007 11 19 11 55 00 3691-99 G co CCGG 137.980 -999.990 ... R5 2008 01 03 11 26 00 47.8011 11.0245 941.00 936.00 5.00 247146 HPB 2007 11 19 11 55 00 3692-99 G co CCGG 138.550 -999.990 ... R5 2008 01 03 11 40 00 47.8011 11.0245 941.00 936.00 5.00 247147 HPB 2007 11 27 11 55 00 4855-99 G co CCGG 166.880 -999.990 ... R5 2008 01 03 11 55 00 47.8011 11.0245 941.00 936.00 5.00 247144 HPB 2007 11 27 11 55 00 4856-99 G co CCGG 166.560 -999.990 ... R5 2008 01 03 12 09 00 47.8011 11.0245 941.00 936.00 5.00 247145 HPB 2007 12 03 11 55 00 2681-99 G co CCGG 136.090 -999.990 ... V2 2008 01 25 13 48 00 47.8011 11.0245 941.00 936.00 5.00 248351 HPB 2007 12 03 11 55 00 2682-99 G co CCGG 136.160 -999.990 ... V2 2008 01 25 14 03 00 47.8011 11.0245 941.00 936.00 5.00 248352 HPB 2007 12 10 11 55 00 3581-99 G co CCGG 140.420 -999.990 ... V2 2008 01 25 14 19 00 47.8011 11.0245 941.00 936.00 5.00 248353 HPB 2007 12 10 11 55 00 3582-99 G co CCGG 139.560 -999.990 ... V2 2008 01 25 14 34 00 47.8011 11.0245 941.00 936.00 5.00 248354 HPB 2007 12 17 11 55 00 2505-99 G co CCGG 223.470 -999.990 .X. V2 2008 02 06 14 34 00 47.8011 11.0245 941.00 936.00 5.00 249029 HPB 2007 12 17 11 55 00 299-99 G co CCGG 223.070 -999.990 .X. V2 2008 02 06 14 18 00 47.8011 11.0245 941.00 936.00 5.00 249028 HPB 2008 01 02 11 55 00 4179-99 G co CCGG 208.610 -999.990 ... V2 2008 02 06 14 49 00 47.8011 11.0245 941.00 936.00 5.00 249030 HPB 2008 01 02 11 55 00 4302-99 G co CCGG 208.210 -999.990 ... V2 2008 02 06 15 04 00 47.8011 11.0245 941.00 936.00 5.00 249031 HPB 2008 01 07 11 55 00 2185-99 G co CCGG 141.660 -999.990 ... V2 2008 02 06 13 01 00 47.8011 11.0245 941.00 936.00 5.00 249035 HPB 2008 01 07 11 55 00 4810-99 G co CCGG 141.510 -999.990 ... V2 2008 02 06 12 46 00 47.8011 11.0245 941.00 936.00 5.00 249034 HPB 2008 01 14 11 55 00 2603-99 G co CCGG 170.300 -999.990 ... V2 2008 02 06 14 03 00 47.8011 11.0245 941.00 936.00 5.00 249033 HPB 2008 01 14 11 55 00 745-99 G co CCGG 170.450 -999.990 ... V2 2008 02 06 13 47 00 47.8011 11.0245 941.00 936.00 5.00 249032 HPB 2008 01 21 12 37 00 4933-99 G co CCGG 133.630 -999.990 ... V2 2008 02 22 11 14 00 47.8011 11.0245 941.00 936.00 5.00 249738 HPB 2008 01 21 12 37 00 4934-99 G co CCGG 132.260 -999.990 ... V2 2008 02 22 11 29 00 47.8011 11.0245 941.00 936.00 5.00 249739 HPB 2008 01 28 11 55 00 4935-99 G co CCGG 301.390 -999.990 .X. V2 2008 02 22 11 45 00 47.8011 11.0245 941.00 936.00 5.00 249736 HPB 2008 01 28 11 55 00 4936-99 G co CCGG 302.860 -999.990 .X. V2 2008 02 22 12 00 00 47.8011 11.0245 941.00 936.00 5.00 249737 HPB 2008 02 04 11 55 00 1125-99 G co CCGG 172.100 -999.990 ... V2 2008 03 06 12 01 00 47.8011 11.0245 941.00 936.00 5.00 250588 HPB 2008 02 04 11 55 00 1126-99 G co CCGG 170.410 -999.990 ... V2 2008 03 06 12 17 00 47.8011 11.0245 941.00 936.00 5.00 250589 HPB 2008 02 11 11 55 00 4905-99 G co CCGG 276.800 -999.990 .X. V2 2008 03 06 12 32 00 47.8011 11.0245 941.00 936.00 5.00 250586 HPB 2008 02 11 11 55 00 4906-99 G co CCGG 277.070 -999.990 .X. V2 2008 03 06 12 47 00 47.8011 11.0245 941.00 936.00 5.00 250587 HPB 2008 02 19 12 12 00 4057-99 G co CCGG 187.890 -999.990 ... V2 2008 03 28 15 00 00 47.8011 11.0245 941.00 936.00 5.00 251580 HPB 2008 02 19 12 12 00 4058-99 G co CCGG 188.320 -999.990 ... R5 2008 03 31 10 54 00 47.8011 11.0245 941.00 936.00 5.00 251581 HPB 2008 02 27 11 55 00 2057-99 G co CCGG 156.960 -999.990 ... V2 2008 03 28 14 29 00 47.8011 11.0245 941.00 936.00 5.00 251578 HPB 2008 02 27 11 55 00 2058-99 G co CCGG 156.660 -999.990 ... V2 2008 03 28 14 45 00 47.8011 11.0245 941.00 936.00 5.00 251579 HPB 2008 03 03 11 55 00 1002-99 G co CCGG 136.030 -999.990 ... R5 2008 04 07 14 31 00 47.8011 11.0245 941.00 936.00 5.00 251909 HPB 2008 03 03 11 55 00 4094-99 G co CCGG 136.950 -999.990 ... R5 2008 04 07 14 46 00 47.8011 11.0245 941.00 936.00 5.00 251910 HPB 2008 03 10 11 55 00 3391-99 G co CCGG 212.310 -999.990 ... R5 2008 04 07 14 03 00 47.8011 11.0245 941.00 936.00 5.00 251907 HPB 2008 03 10 11 55 00 4732-99 G co CCGG 211.600 -999.990 ... R5 2008 04 07 14 17 00 47.8011 11.0245 941.00 936.00 5.00 251908 HPB 2008 03 17 12 15 00 707-99 G co CCGG 250.410 -999.990 .XC R5 2008 04 28 16 55 00 47.8011 11.0245 941.00 936.00 5.00 253188 HPB 2008 03 17 12 15 00 951-99 G co CCGG 251.650 -999.990 .XC R5 2008 04 28 17 09 00 47.8011 11.0245 941.00 936.00 5.00 253189 HPB 2008 03 25 12 01 00 2572-99 G co CCGG 171.610 -999.990 ... R5 2008 04 29 10 15 00 47.8011 11.0245 941.00 936.00 5.00 253186 HPB 2008 03 25 12 01 00 4853-99 G co CCGG 172.280 -999.990 ... R5 2008 04 29 10 29 00 47.8011 11.0245 941.00 936.00 5.00 253187 HPB 2008 03 31 11 55 00 1457-99 G co CCGG 206.550 -999.990 ... R5 2008 04 25 11 30 00 47.8011 11.0245 941.00 936.00 5.00 253067 HPB 2008 03 31 11 55 00 4291-99 G co CCGG 206.080 -999.990 ... R5 2008 04 25 11 45 00 47.8011 11.0245 941.00 936.00 5.00 253068 HPB 2008 04 07 12 01 00 1682-99 G co CCGG 170.450 -999.990 ... R5 2008 04 25 12 13 00 47.8011 11.0245 941.00 936.00 5.00 253066 HPB 2008 04 07 12 01 00 594-99 G co CCGG 170.270 -999.990 ... R5 2008 04 25 11 59 00 47.8011 11.0245 941.00 936.00 5.00 253065 HPB 2008 04 14 11 55 00 3037-99 G co CCGG 167.520 -999.990 ... V2 2008 05 09 11 59 00 47.8011 11.0245 941.00 936.00 5.00 253984 HPB 2008 04 14 11 55 00 4354-99 G co CCGG 167.450 -999.990 ... V2 2008 05 09 12 14 00 47.8011 11.0245 941.00 936.00 5.00 253985 HPB 2008 04 22 11 55 00 1073-99 G co CCGG 188.430 -999.990 ... V2 2008 05 09 11 28 00 47.8011 11.0245 941.00 936.00 5.00 253986 HPB 2008 04 22 11 55 00 3709-99 G co CCGG 188.450 -999.990 ... V2 2008 05 09 11 44 00 47.8011 11.0245 941.00 936.00 5.00 253987 HPB 2008 04 28 11 55 00 959-99 G co CCGG 164.400 -999.990 ... V2 2008 06 02 15 53 00 47.8011 11.0245 941.00 936.00 5.00 254917 HPB 2008 04 28 11 55 00 960-99 G co CCGG 163.540 -999.990 ... V2 2008 06 02 16 08 00 47.8011 11.0245 941.00 936.00 5.00 254918 HPB 2008 05 05 11 59 00 3151-99 G co CCGG 152.170 -999.990 ... V2 2008 06 02 15 22 00 47.8011 11.0245 941.00 936.00 5.00 254915 HPB 2008 05 05 11 59 00 3152-99 G co CCGG 152.460 -999.990 ... V2 2008 06 02 15 37 00 47.8011 11.0245 941.00 936.00 5.00 254916 HPB 2008 05 14 11 26 00 2131-99 G co CCGG 150.160 -999.990 ... V2 2008 06 12 12 26 00 47.8011 11.0245 941.00 936.00 5.00 255452 HPB 2008 05 14 11 26 00 2132-99 G co CCGG 150.310 -999.990 ... V2 2008 06 12 12 42 00 47.8011 11.0245 941.00 936.00 5.00 255453 HPB 2008 05 19 11 57 00 353-99 G co CCGG 139.090 -999.990 ... V2 2008 06 13 13 53 00 47.8011 11.0245 941.00 936.00 5.00 255450 HPB 2008 05 19 11 57 00 354-99 G co CCGG 138.680 -999.990 ... V2 2008 06 13 14 09 00 47.8011 11.0245 941.00 936.00 5.00 255451 HPB 2008 05 27 11 56 00 1888-99 G co CCGG 149.590 -999.990 P.. R5 2008 06 30 13 13 00 47.8011 11.0245 941.00 936.00 5.00 256505 HPB 2008 05 27 11 56 00 2108-99 G co CCGG 143.640 -999.990 P.. R5 2008 06 30 13 27 00 47.8011 11.0245 941.00 936.00 5.00 256506 HPB 2008 06 02 11 55 00 3700-99 G co CCGG 137.080 -999.990 ... V2 2008 06 27 15 12 00 47.8011 11.0245 941.00 936.00 5.00 256508 HPB 2008 06 02 11 55 00 99-99 G co CCGG 136.670 -999.990 ... V2 2008 06 27 14 56 00 47.8011 11.0245 941.00 936.00 5.00 256507 HPB 2008 06 09 11 55 00 1467-99 G co CCGG 136.540 -999.990 ... R5 2008 07 15 11 02 00 47.8011 11.0245 941.00 936.00 5.00 257251 HPB 2008 06 09 11 55 00 42-99 G co CCGG 136.090 -999.990 ... R5 2008 07 15 10 48 00 47.8011 11.0245 941.00 936.00 5.00 257250 HPB 2008 06 16 11 57 00 3458-99 G co CCGG 133.510 -999.990 ... R5 2008 07 15 11 45 00 47.8011 11.0245 941.00 936.00 5.00 257248 HPB 2008 06 16 11 57 00 4837-99 G co CCGG 133.990 -999.990 ... R5 2008 07 15 11 59 00 47.8011 11.0245 941.00 936.00 5.00 257249 HPB 2008 06 23 11 55 00 4276-99 G co CCGG 140.650 -999.990 ... R5 2008 07 22 16 03 00 47.8011 11.0245 941.00 936.00 5.00 257771 HPB 2008 06 23 11 55 00 719-99 G co CCGG 141.110 -999.990 ... R5 2008 07 22 16 18 00 47.8011 11.0245 941.00 936.00 5.00 257772 HPB 2008 07 02 12 28 00 1148-99 G co CCGG 120.900 -999.990 ... R5 2008 07 22 16 32 00 47.8011 11.0245 941.00 936.00 5.00 257773 HPB 2008 07 02 12 28 00 3806-99 G co CCGG 120.730 -999.990 ... R5 2008 07 22 16 46 00 47.8011 11.0245 941.00 936.00 5.00 257774 HPB 2008 07 07 11 56 00 3370-99 G co CCGG 104.030 -999.990 ... V2 2008 08 19 13 32 00 47.8011 11.0245 941.00 936.00 5.00 258987 HPB 2008 07 07 11 56 00 3706-99 G co CCGG 103.800 -999.990 ... V2 2008 08 19 13 17 00 47.8011 11.0245 941.00 936.00 5.00 258986 HPB 2008 07 15 11 42 00 1062-99 G co CCGG 122.480 -999.990 ... V2 2008 08 19 13 47 00 47.8011 11.0245 941.00 936.00 5.00 258984 HPB 2008 07 15 11 42 00 4403-99 G co CCGG 122.390 -999.990 ... V2 2008 08 19 14 03 00 47.8011 11.0245 941.00 936.00 5.00 258985 HPB 2008 07 21 11 55 00 1086-99 G co CCGG 106.620 -999.990 ... V2 2008 08 21 14 52 00 47.8011 11.0245 941.00 936.00 5.00 259465 HPB 2008 07 21 11 55 00 2401-99 G co CCGG 104.930 -999.990 ... V2 2008 08 21 15 07 00 47.8011 11.0245 941.00 936.00 5.00 259466 HPB 2008 07 28 12 05 00 3312-99 G co CCGG 158.650 -999.990 ... V2 2008 08 21 14 36 00 47.8011 11.0245 941.00 936.00 5.00 259467 HPB 2008 07 28 12 05 00 459-99 G co CCGG 159.120 -999.990 ... V2 2008 08 21 14 21 00 47.8011 11.0245 941.00 936.00 5.00 259468 HPB 2008 08 04 11 55 00 1931-99 G co CCGG 90.590 -999.990 ... R5 2008 09 03 12 48 00 47.8011 11.0245 941.00 936.00 5.00 260034 HPB 2008 08 04 11 55 00 2800-99 G co CCGG 91.830 -999.990 ... R5 2008 09 03 13 02 00 47.8011 11.0245 941.00 936.00 5.00 260035 HPB 2008 08 11 11 55 00 1275-99 G co CCGG 124.980 -999.990 ... R5 2008 09 03 13 16 00 47.8011 11.0245 941.00 936.00 5.00 260032 HPB 2008 08 11 11 55 00 1419-99 G co CCGG 126.220 -999.990 ... R5 2008 09 03 13 31 00 47.8011 11.0245 941.00 936.00 5.00 260033 HPB 2008 08 20 11 57 00 1671-99 G co CCGG 109.360 -999.990 ... V2 2008 09 24 14 03 00 47.8011 11.0245 941.00 936.00 5.00 261291 HPB 2008 08 20 11 57 00 4241-99 G co CCGG 107.250 -999.990 ... V2 2008 09 24 13 47 00 47.8011 11.0245 941.00 936.00 5.00 261290 HPB 2008 08 26 11 55 00 1074-99 G co CCGG 124.380 -999.990 ... R5 2008 09 24 12 43 00 47.8011 11.0245 941.00 936.00 5.00 261292 HPB 2008 08 26 11 55 00 3863-99 G co CCGG 124.330 -999.990 ... R5 2008 09 24 12 58 00 47.8011 11.0245 941.00 936.00 5.00 261293 HPB 2008 09 01 12 02 00 2846-99 G co CCGG 111.790 -999.990 ... R5 2008 10 08 13 47 00 47.8011 11.0245 941.00 936.00 5.00 261983 HPB 2008 09 01 12 02 00 4565-99 G co CCGG 110.930 -999.990 ... R5 2008 10 08 13 32 00 47.8011 11.0245 941.00 936.00 5.00 261982 HPB 2008 09 08 11 55 00 112-99 G co CCGG 99.610 -999.990 ... R5 2008 10 08 13 18 00 47.8011 11.0245 941.00 936.00 5.00 261985 HPB 2008 09 08 11 55 00 4431-99 G co CCGG 99.400 -999.990 ... R5 2008 10 08 13 04 00 47.8011 11.0245 941.00 936.00 5.00 261984 HPB 2008 09 15 12 00 00 2383-99 G co CCGG 135.010 -999.990 ... R5 2008 10 22 12 48 00 47.8011 11.0245 941.00 936.00 5.00 262615 HPB 2008 09 15 12 00 00 623-99 G co CCGG 134.850 -999.990 ... R5 2008 10 22 12 34 00 47.8011 11.0245 941.00 936.00 5.00 262614 HPB 2008 09 22 11 53 00 1545-99 G co CCGG 132.060 -999.990 ... R5 2008 10 22 12 20 00 47.8011 11.0245 941.00 936.00 5.00 262613 HPB 2008 09 22 11 53 00 687-99 G co CCGG 130.600 -999.990 ... R5 2008 10 22 12 05 00 47.8011 11.0245 941.00 936.00 5.00 262612 HPB 2008 09 29 11 55 00 3366-99 G co CCGG 157.820 -999.990 ... V2 2008 11 03 11 49 00 47.8011 11.0245 941.00 936.00 5.00 263328 HPB 2008 09 29 11 55 00 817-99 G co CCGG 157.740 -999.990 ... V2 2008 11 03 12 05 00 47.8011 11.0245 941.00 936.00 5.00 263329 HPB 2008 10 06 11 57 00 1467-99 G co CCGG 101.790 -999.990 ... V2 2008 11 03 12 36 00 47.8011 11.0245 941.00 936.00 5.00 263327 HPB 2008 10 06 11 57 00 42-99 G co CCGG 101.790 -999.990 ... V2 2008 11 03 12 20 00 47.8011 11.0245 941.00 936.00 5.00 263326 HPB 2008 10 14 11 55 00 4104-99 G co CCGG 116.600 -999.990 ... V2 2008 11 17 09 50 00 47.8011 11.0245 941.00 936.00 5.00 263859 HPB 2008 10 14 11 55 00 4929-99 G co CCGG 116.790 -999.990 ... V2 2008 11 17 10 05 00 47.8011 11.0245 941.00 936.00 5.00 263860 HPB 2008 10 20 11 55 00 156-99 G co CCGG 115.600 -999.990 ... V2 2008 11 17 09 35 00 47.8011 11.0245 941.00 936.00 5.00 263862 HPB 2008 10 20 11 55 00 2487-99 G co CCGG 115.300 -999.990 ... V2 2008 11 17 09 19 00 47.8011 11.0245 941.00 936.00 5.00 263861 HPB 2008 10 27 11 55 00 162-99 G co CCGG 119.210 -999.990 ... V2 2008 12 05 11 56 00 47.8011 11.0245 941.00 936.00 5.00 264907 HPB 2008 10 27 11 55 00 240-99 G co CCGG 118.780 -999.990 ... V2 2008 12 05 12 11 00 47.8011 11.0245 941.00 936.00 5.00 264908 HPB 2008 11 05 11 55 00 172-99 G co CCGG 105.830 -999.990 ... V2 2008 12 05 12 57 00 47.8011 11.0245 941.00 936.00 5.00 264909 HPB 2008 11 05 11 55 00 2174-99 G co CCGG 105.480 -999.990 ... V2 2008 12 05 13 13 00 47.8011 11.0245 941.00 936.00 5.00 264910 HPB 2008 11 11 11 55 00 1431-99 G co CCGG 112.800 -999.990 ... V2 2008 12 18 12 27 00 47.8011 11.0245 941.00 936.00 5.00 265511 HPB 2008 11 11 11 55 00 2790-99 G co CCGG 112.470 -999.990 ... V2 2008 12 18 12 42 00 47.8011 11.0245 941.00 936.00 5.00 265512 HPB 2008 11 18 11 55 00 2750-99 G co CCGG 173.810 -999.990 ... V2 2008 12 18 11 56 00 47.8011 11.0245 941.00 936.00 5.00 265509 HPB 2008 11 18 11 55 00 3666-99 G co CCGG 175.580 -999.990 ... V2 2008 12 18 12 12 00 47.8011 11.0245 941.00 936.00 5.00 265510 HPB 2008 11 24 11 57 00 2503-99 G co CCGG 134.200 -999.990 ... V2 2008 12 30 11 32 00 47.8011 11.0245 941.00 936.00 5.00 266558 HPB 2008 11 24 11 57 00 4847-99 G co CCGG 133.590 -999.990 ... V2 2008 12 30 11 48 00 47.8011 11.0245 941.00 936.00 5.00 266559 HPB 2008 12 01 13 15 00 3424-99 G co CCGG 228.900 -999.990 .X. V2 2009 01 09 11 42 00 47.8011 11.0245 941.00 936.00 5.00 266969 HPB 2008 12 01 13 15 00 4891-99 G co CCGG 227.940 -999.990 .X. V2 2009 01 09 11 57 00 47.8011 11.0245 941.00 936.00 5.00 266970 HPB 2008 12 10 11 55 00 1006-99 G co CCGG 312.070 -999.990 .X. V2 2009 01 08 16 39 00 47.8011 11.0245 941.00 936.00 5.00 266968 HPB 2008 12 10 11 55 00 696-99 G co CCGG 312.040 -999.990 .X. V2 2009 01 08 16 23 00 47.8011 11.0245 941.00 936.00 5.00 266967 HPB 2008 12 15 11 55 00 1192-99 G co CCGG 135.990 -999.990 ... V2 2009 01 20 13 10 00 47.8011 11.0245 941.00 936.00 5.00 267714 HPB 2008 12 15 11 55 00 2293-99 G co CCGG 134.340 -999.990 ... V2 2009 01 20 13 26 00 47.8011 11.0245 941.00 936.00 5.00 267715 HPB 2008 12 22 11 55 00 4166-99 G co CCGG 141.410 -999.990 ... V2 2009 01 20 14 58 00 47.8011 11.0245 941.00 936.00 5.00 267713 HPB 2008 12 22 11 55 00 818-99 G co CCGG 140.700 -999.990 ... V2 2009 01 20 14 43 00 47.8011 11.0245 941.00 936.00 5.00 267712 HPB 2008 12 30 11 55 00 1961-99 G co CCGG 236.290 -999.990 P.. V2 2009 01 28 15 00 00 47.8011 11.0245 941.00 936.00 5.00 268173 HPB 2008 12 30 11 55 00 3296-99 G co CCGG 182.090 -999.990 P.. V2 2009 01 28 15 16 00 47.8011 11.0245 941.00 936.00 5.00 268174 HPB 2009 01 07 11 55 00 1548-99 G co CCGG 321.160 -999.990 .XC R5 2009 01 30 10 10 00 47.8011 11.0245 941.00 936.00 5.00 268332 HPB 2009 01 07 11 55 00 4554-99 G co CCGG 321.690 -999.990 .XC R5 2009 01 30 09 56 00 47.8011 11.0245 941.00 936.00 5.00 268333 HPB 2009 01 13 11 55 00 4805-99 G co CCGG 118.030 -999.990 ... R5 2009 02 19 12 17 00 47.8011 11.0245 941.00 936.00 5.00 269667 HPB 2009 01 13 11 55 00 4877-99 G co CCGG 117.670 -999.990 ... R5 2009 02 19 12 03 00 47.8011 11.0245 941.00 936.00 5.00 269666 HPB 2009 01 19 11 55 00 1069-99 G co CCGG 126.470 -999.990 ... R5 2009 02 19 11 49 00 47.8011 11.0245 941.00 936.00 5.00 269665 HPB 2009 01 19 11 55 00 567-99 G co CCGG 126.990 -999.990 ... R5 2009 02 19 11 35 00 47.8011 11.0245 941.00 936.00 5.00 269664 HPB 2009 01 28 11 57 00 2921-99 G co CCGG 232.910 -999.990 P.. V2 2009 03 21 15 08 00 47.8011 11.0245 941.00 936.00 5.00 271787 HPB 2009 01 28 11 57 00 3525-99 G co CCGG 235.710 -999.990 P.. V2 2009 03 21 15 23 00 47.8011 11.0245 941.00 936.00 5.00 271788 HPB 2009 02 02 11 55 00 1145-99 G co CCGG 222.370 -999.990 .X. V2 2009 03 21 15 38 00 47.8011 11.0245 941.00 936.00 5.00 271785 HPB 2009 02 02 11 55 00 3043-99 G co CCGG 221.720 -999.990 .X. V2 2009 03 21 15 54 00 47.8011 11.0245 941.00 936.00 5.00 271786 HPB 2009 02 09 11 55 00 1117-99 G co CCGG 235.500 -999.990 .X. V2 2009 03 07 12 51 00 47.8011 11.0245 941.00 936.00 5.00 270977 HPB 2009 02 09 11 55 00 4892-99 G co CCGG 235.740 -999.990 .X. V2 2009 03 07 13 06 00 47.8011 11.0245 941.00 936.00 5.00 270978 HPB 2009 02 16 12 00 00 2902-99 G co CCGG 173.490 -999.990 ... V2 2009 03 07 13 22 00 47.8011 11.0245 941.00 936.00 5.00 270979 HPB 2009 02 16 12 00 00 3643-99 G co CCGG 172.240 -999.990 ... V2 2009 03 07 13 37 00 47.8011 11.0245 941.00 936.00 5.00 270980 HPB 2009 02 23 11 58 00 1424-99 G co CCGG 167.340 -999.990 ... V2 2009 04 08 12 34 00 47.8011 11.0245 941.00 936.00 5.00 272911 HPB 2009 02 23 11 58 00 4413-99 G co CCGG 168.180 -999.990 ... V2 2009 04 08 12 50 00 47.8011 11.0245 941.00 936.00 5.00 272912 HPB 2009 03 02 11 55 00 1770-99 G co CCGG 184.380 -999.990 P.. V2 2009 04 08 12 03 00 47.8011 11.0245 941.00 936.00 5.00 272913 HPB 2009 03 02 11 55 00 4109-99 G co CCGG 188.780 -999.990 P.. V2 2009 04 08 12 19 00 47.8011 11.0245 941.00 936.00 5.00 272914 HPB 2009 03 09 11 55 00 2781-99 G co CCGG 157.180 -999.990 ... R5 2009 04 08 14 32 00 47.8011 11.0245 941.00 936.00 5.00 272996 HPB 2009 03 09 11 55 00 3507-99 G co CCGG 156.510 -999.990 ... R5 2009 04 08 14 18 00 47.8011 11.0245 941.00 936.00 5.00 272995 HPB 2009 03 16 11 55 00 2804-99 G co CCGG 160.800 -999.990 ... R5 2009 04 08 15 01 00 47.8011 11.0245 941.00 936.00 5.00 272994 HPB 2009 03 16 11 55 00 3743-99 G co CCGG 161.010 -999.990 ... R5 2009 04 08 14 47 00 47.8011 11.0245 941.00 936.00 5.00 272993 HPB 2009 03 23 11 55 00 1534-99 G co CCGG 162.360 -999.990 ... V2 2009 04 18 14 01 00 47.8011 11.0245 941.00 936.00 5.00 274003 HPB 2009 03 23 11 55 00 2525-99 G co CCGG 162.190 -999.990 ... V2 2009 04 18 14 16 00 47.8011 11.0245 941.00 936.00 5.00 274004 HPB 2009 03 30 11 55 00 1645-99 G co CCGG 187.970 -999.990 ... V2 2009 04 18 14 32 00 47.8011 11.0245 941.00 936.00 5.00 274001 HPB 2009 03 30 11 55 00 4262-99 G co CCGG 188.370 -999.990 ... V2 2009 04 18 14 47 00 47.8011 11.0245 941.00 936.00 5.00 274002 HPB 2009 04 06 11 59 00 2685-99 G co CCGG 185.830 -999.990 ... R5 2009 05 04 10 46 00 47.8011 11.0245 941.00 936.00 5.00 274650 HPB 2009 04 06 11 59 00 695-99 G co CCGG 185.490 -999.990 ... R5 2009 05 04 10 32 00 47.8011 11.0245 941.00 936.00 5.00 274649 HPB 2009 04 14 11 55 00 3185-99 G co CCGG 177.080 -999.990 ... V2 2009 05 02 17 08 00 47.8011 11.0245 941.00 936.00 5.00 274651 HPB 2009 04 14 11 55 00 3893-99 G co CCGG 177.220 -999.990 ... V2 2009 05 02 17 24 00 47.8011 11.0245 941.00 936.00 5.00 274652 HPB 2009 04 20 11 55 00 1957-99 G co CCGG 195.870 -999.990 ... R5 2009 05 28 14 11 00 47.8011 11.0245 941.00 936.00 5.00 276015 HPB 2009 04 20 11 55 00 4592-99 G co CCGG 196.240 -999.990 ... R5 2009 05 28 14 26 00 47.8011 11.0245 941.00 936.00 5.00 276016 HPB 2009 04 27 11 55 00 2790-99 G co CCGG 168.880 -999.990 ... R5 2009 05 28 13 57 00 47.8011 11.0245 941.00 936.00 5.00 276014 HPB 2009 04 27 11 55 00 3833-99 G co CCGG 167.770 -999.990 ... R5 2009 05 28 13 43 00 47.8011 11.0245 941.00 936.00 5.00 276013 HPB 2009 05 04 11 55 00 1569-99 G co CCGG 163.390 -999.990 ... V2 2009 06 23 12 03 00 47.8011 11.0245 941.00 936.00 5.00 277017 HPB 2009 05 04 11 55 00 171-99 G co CCGG 164.480 -999.990 ... V2 2009 06 23 11 47 00 47.8011 11.0245 941.00 936.00 5.00 277016 HPB 2009 05 11 11 55 00 1648-99 G co CCGG 147.210 -999.990 ... V2 2009 06 23 12 18 00 47.8011 11.0245 941.00 936.00 5.00 277014 HPB 2009 05 11 11 55 00 1711-99 G co CCGG 147.670 -999.990 ... V2 2009 06 23 12 33 00 47.8011 11.0245 941.00 936.00 5.00 277015 HPB 2009 05 19 11 55 00 1547-99 G co CCGG 137.290 -999.990 ... V2 2009 06 30 15 01 00 47.8011 11.0245 941.00 936.00 5.00 277673 HPB 2009 05 19 11 55 00 4644-99 G co CCGG 137.460 -999.990 ... V2 2009 06 30 15 17 00 47.8011 11.0245 941.00 936.00 5.00 277674 HPB 2009 05 25 12 09 00 1576-99 G co CCGG 134.800 -999.990 ... V2 2009 06 30 14 46 00 47.8011 11.0245 941.00 936.00 5.00 277672 HPB 2009 05 25 12 09 00 1939-99 G co CCGG 134.450 -999.990 ... V2 2009 06 30 14 30 00 47.8011 11.0245 941.00 936.00 5.00 277671 HPB 2009 06 02 11 55 00 4606-99 G co CCGG 135.160 -999.990 ... V2 2009 07 13 15 25 00 47.8011 11.0245 941.00 936.00 5.00 278495 HPB 2009 06 02 11 55 00 801-99 G co CCGG 135.590 -999.990 ... V2 2009 07 13 15 10 00 47.8011 11.0245 941.00 936.00 5.00 278494 HPB 2009 06 08 11 55 00 3644-99 G co CCGG 117.710 -999.990 ... V2 2009 07 13 16 11 00 47.8011 11.0245 941.00 936.00 5.00 278492 HPB 2009 06 08 11 55 00 4853-99 G co CCGG 118.550 -999.990 ... V2 2009 07 13 16 27 00 47.8011 11.0245 941.00 936.00 5.00 278493 HPB 2009 06 15 11 55 00 2821-99 G co CCGG 111.620 -999.990 ... R5 2009 07 30 13 29 00 47.8011 11.0245 941.00 936.00 5.00 280211 HPB 2009 06 15 11 55 00 4986-99 G co CCGG 110.710 -999.990 ... R5 2009 07 30 13 44 00 47.8011 11.0245 941.00 936.00 5.00 280212 HPB 2009 06 22 11 55 00 1785-99 G co CCGG 115.810 -999.990 ... R5 2009 07 30 13 01 00 47.8011 11.0245 941.00 936.00 5.00 280213 HPB 2009 06 22 11 55 00 4570-99 G co CCGG 115.510 -999.990 ... R5 2009 07 30 13 15 00 47.8011 11.0245 941.00 936.00 5.00 280214 HPB 2009 06 29 11 35 00 1534-99 G co CCGG 136.410 -999.990 ... V2 2009 07 29 15 58 00 47.8011 11.0245 941.00 936.00 5.00 280215 HPB 2009 06 29 11 35 00 952-99 G co CCGG 136.940 -999.990 ... V2 2009 07 29 16 13 00 47.8011 11.0245 941.00 936.00 5.00 280216 HPB 2009 07 06 11 55 00 2462-99 G co CCGG 110.870 -999.990 ... V2 2009 07 29 16 44 00 47.8011 11.0245 941.00 936.00 5.00 280218 HPB 2009 07 06 11 55 00 4838-99 G co CCGG 111.610 -999.990 ... V2 2009 07 29 16 29 00 47.8011 11.0245 941.00 936.00 5.00 280217 HPB 2009 07 13 12 34 56 2288-99 G co CCGG 111.220 -999.990 ... V2 2009 08 17 12 54 00 47.8011 11.0245 941.00 936.00 5.00 281249 HPB 2009 07 13 12 34 56 2449-99 G co CCGG 111.210 -999.990 ... V2 2009 08 17 12 39 00 47.8011 11.0245 941.00 936.00 5.00 281248 HPB 2009 07 20 11 55 00 1280-99 G co CCGG 103.540 -999.990 ... V2 2009 08 17 12 23 00 47.8011 11.0245 941.00 936.00 5.00 281247 HPB 2009 07 20 11 55 00 4110-99 G co CCGG 103.390 -999.990 ... V2 2009 08 17 12 08 00 47.8011 11.0245 941.00 936.00 5.00 281246 HPB 2009 07 29 11 52 00 3424-99 G co CCGG 123.360 -999.990 ... V2 2009 08 26 10 06 00 47.8011 11.0245 941.00 936.00 5.00 281716 HPB 2009 07 29 11 52 00 4891-99 G co CCGG 123.300 -999.990 ... V2 2009 08 26 09 51 00 47.8011 11.0245 941.00 936.00 5.00 281717 HPB 2009 08 03 11 55 00 6052-66 G co CCGG 106.770 -999.990 ... R5 2009 08 25 16 16 00 47.8011 11.0245 941.00 936.00 5.00 281719 HPB 2009 08 03 11 55 00 6071-66 G co CCGG 106.510 -999.990 ... R5 2009 08 25 16 02 00 47.8011 11.0245 941.00 936.00 5.00 281718 HPB 2009 08 10 11 55 00 2526-99 G co CCGG 118.370 -999.990 ... V2 2009 09 03 14 12 00 47.8011 11.0245 941.00 936.00 5.00 282711 HPB 2009 08 10 11 55 00 3609-99 G co CCGG 118.580 -999.990 ... V2 2009 09 03 13 57 00 47.8011 11.0245 941.00 936.00 5.00 282712 HPB 2009 08 17 11 55 00 1008-99 G co CCGG 117.490 -999.990 ... V2 2009 09 03 14 28 00 47.8011 11.0245 941.00 936.00 5.00 282709 HPB 2009 08 17 11 55 00 2603-99 G co CCGG 116.700 -999.990 ... V2 2009 09 03 14 43 00 47.8011 11.0245 941.00 936.00 5.00 282710 HPB 2009 08 24 11 55 00 1592-99 G co CCGG 143.810 -999.990 ... V2 2009 09 25 12 08 00 47.8011 11.0245 941.00 936.00 5.00 283924 HPB 2009 08 24 11 55 00 183-99 G co CCGG 143.720 -999.990 ... V2 2009 09 25 12 23 00 47.8011 11.0245 941.00 936.00 5.00 283925 HPB 2009 08 31 11 55 00 1447-99 G co CCGG 130.950 -999.990 ... V2 2009 09 25 11 37 00 47.8011 11.0245 941.00 936.00 5.00 283922 HPB 2009 08 31 11 55 00 4162-99 G co CCGG 130.710 -999.990 ... V2 2009 09 25 11 52 00 47.8011 11.0245 941.00 936.00 5.00 283923 HPB 2009 09 08 11 55 00 3173-99 G co CCGG 137.500 -999.990 ... V2 2009 10 02 15 09 00 47.8011 11.0245 941.00 936.00 5.00 284463 HPB 2009 09 08 11 55 00 4302-99 G co CCGG 137.420 -999.990 ... V2 2009 10 02 15 24 00 47.8011 11.0245 941.00 936.00 5.00 284464 HPB 2009 09 16 11 55 00 161-99 G co CCGG 165.820 -999.990 ... V2 2009 10 02 14 38 00 47.8011 11.0245 941.00 936.00 5.00 284465 HPB 2009 09 16 11 55 00 5021-99 G co CCGG 166.550 -999.990 ... V2 2009 10 02 14 53 00 47.8011 11.0245 941.00 936.00 5.00 284466 HPB 2009 09 21 11 55 00 3156-99 G co CCGG 160.070 -999.990 ... V2 2009 10 19 12 52 00 47.8011 11.0245 941.00 936.00 5.00 285152 HPB 2009 09 21 11 55 00 3458-99 G co CCGG 159.590 -999.990 ... V2 2009 10 19 13 07 00 47.8011 11.0245 941.00 936.00 5.00 285153 HPB 2009 09 28 11 55 00 2063-99 G co CCGG 145.420 -999.990 ... V2 2009 10 19 13 22 00 47.8011 11.0245 941.00 936.00 5.00 285155 HPB 2009 09 28 11 55 00 3568-99 G co CCGG 145.530 -999.990 ... V2 2009 10 19 13 38 00 47.8011 11.0245 941.00 936.00 5.00 285154 HPB 2009 10 05 11 55 00 1102-99 G co CCGG 129.760 -999.990 ... V2 2009 11 06 17 05 00 47.8011 11.0245 941.00 936.00 5.00 285875 HPB 2009 10 05 11 55 00 2064-99 G co CCGG 129.200 -999.990 ... V2 2009 11 06 17 20 00 47.8011 11.0245 941.00 936.00 5.00 285876 HPB 2009 10 12 11 55 00 4135-99 G co CCGG 112.560 -999.990 ... V2 2009 11 09 16 30 00 47.8011 11.0245 941.00 936.00 5.00 285873 HPB 2009 10 12 11 55 00 590-99 G co CCGG 112.950 -999.990 ... V2 2009 11 09 16 46 00 47.8011 11.0245 941.00 936.00 5.00 285874 HPB 2009 10 19 11 55 00 1280-99 G co CCGG 145.950 -999.990 ... V2 2009 12 01 13 14 00 47.8011 11.0245 941.00 936.00 5.00 286828 HPB 2009 10 19 11 55 00 2288-99 G co CCGG 146.040 -999.990 ... V2 2009 12 01 13 30 00 47.8011 11.0245 941.00 936.00 5.00 286829 HPB 2009 10 26 11 55 00 2449-99 G co CCGG 119.190 -999.990 ... V2 2009 12 01 13 46 00 47.8011 11.0245 941.00 936.00 5.00 286826 HPB 2009 10 26 11 55 00 4110-99 G co CCGG 118.690 -999.990 ... V2 2009 12 01 14 01 00 47.8011 11.0245 941.00 936.00 5.00 286827 HPB 2009 11 02 11 55 00 1302-99 G co CCGG 111.620 -999.990 ... V2 2009 12 14 13 37 00 47.8011 11.0245 941.00 936.00 5.00 287618 HPB 2009 11 02 11 55 00 4111-99 G co CCGG 111.160 -999.990 ... V2 2009 12 14 13 53 00 47.8011 11.0245 941.00 936.00 5.00 287619 HPB 2009 11 10 11 55 00 1061-99 G co CCGG 251.340 -999.990 .X. V2 2009 12 14 16 11 00 47.8011 11.0245 941.00 936.00 5.00 287616 HPB 2009 11 10 11 55 00 3789-99 G co CCGG 251.720 -999.990 .X. V2 2009 12 14 16 27 00 47.8011 11.0245 941.00 936.00 5.00 287617 HPB 2009 11 16 11 55 00 4237-99 G co CCGG 102.020 -999.990 ... V2 2010 01 12 15 16 00 47.8011 11.0245 941.00 936.00 5.00 288328 HPB 2009 11 16 11 55 00 4566-99 G co CCGG 102.340 -999.990 ... V2 2010 01 12 15 31 00 47.8011 11.0245 941.00 936.00 5.00 288329 HPB 2009 11 24 11 55 00 2474-99 G co CCGG 124.160 -999.990 P.. V2 2010 01 12 13 44 00 47.8011 11.0245 941.00 936.00 5.00 288330 HPB 2009 11 24 11 55 00 2844-99 G co CCGG 127.350 -999.990 P.. V2 2010 01 12 13 59 00 47.8011 11.0245 941.00 936.00 5.00 288331 HPB 2009 12 01 11 55 00 2880-99 G co CCGG 233.620 -999.990 .X. V2 2009 12 30 14 15 00 47.8011 11.0245 941.00 936.00 5.00 288604 HPB 2009 12 01 11 55 00 4603-99 G co CCGG 232.230 -999.990 .X. V2 2009 12 30 14 30 00 47.8011 11.0245 941.00 936.00 5.00 288605 HPB 2009 12 08 11 55 00 2970-99 G co CCGG 128.980 -999.990 ... V2 2009 12 30 14 46 00 47.8011 11.0245 941.00 936.00 5.00 288602 HPB 2009 12 08 11 55 00 2986-99 G co CCGG 129.730 -999.990 ... V2 2009 12 30 15 01 00 47.8011 11.0245 941.00 936.00 5.00 288603 HPB 2009 12 14 11 55 00 1613-99 G co CCGG 232.020 -999.990 .X. V2 2010 02 23 11 50 00 47.8011 11.0245 941.00 936.00 5.00 290331 HPB 2009 12 14 11 55 00 239-99 G co CCGG 232.460 -999.990 .X. V2 2010 02 23 11 35 00 47.8011 11.0245 941.00 936.00 5.00 290330 HPB 2009 12 21 11 55 00 1113-99 G co CCGG 138.640 -999.990 ... V2 2010 02 23 12 21 00 47.8011 11.0245 941.00 936.00 5.00 290333 HPB 2009 12 21 11 55 00 2566-99 G co CCGG 137.330 -999.990 ... V2 2010 02 23 12 06 00 47.8011 11.0245 941.00 936.00 5.00 290332 HPB 2009 12 28 11 55 00 4174-99 G co CCGG 139.650 -999.990 ... V2 2010 02 17 16 25 00 47.8011 11.0245 941.00 936.00 5.00 290127 HPB 2009 12 28 11 55 00 4525-99 G co CCGG 139.510 -999.990 ... V2 2010 02 17 16 40 00 47.8011 11.0245 941.00 936.00 5.00 290128 HPB 2010 01 05 11 55 00 2186-99 G co CCGG 388.820 -999.990 P.. V2 2010 02 17 17 10 00 47.8011 11.0245 941.00 936.00 5.00 290126 HPB 2010 01 05 11 55 00 3035-99 G co CCGG 369.400 -999.990 P.. V2 2010 02 17 16 55 00 47.8011 11.0245 941.00 936.00 5.00 290125 HPB 2010 01 13 12 51 00 1295-99 G co CCGG 198.760 -999.990 ... V2 2010 02 25 14 02 00 47.8011 11.0245 941.00 936.00 5.00 290518 HPB 2010 01 13 12 51 00 1371-99 G co CCGG 198.550 -999.990 ... V2 2010 02 25 13 47 00 47.8011 11.0245 941.00 936.00 5.00 290517 HPB 2010 01 18 11 55 00 3374-99 G co CCGG 172.580 -999.990 ... V2 2010 02 25 14 17 00 47.8011 11.0245 941.00 936.00 5.00 290519 HPB 2010 01 18 11 55 00 4193-99 G co CCGG 171.170 -999.990 ... V2 2010 02 25 14 32 00 47.8011 11.0245 941.00 936.00 5.00 290520 HPB 2010 01 26 11 55 00 4110-99 G co CCGG 429.650 -999.990 .X. V2 2010 03 15 10 37 00 47.8011 11.0245 941.00 936.00 5.00 291716 HPB 2010 01 26 11 55 00 4591-99 G co CCGG 429.670 -999.990 .X. V2 2010 03 15 10 52 00 47.8011 11.0245 941.00 936.00 5.00 291717 HPB 2010 02 01 11 55 00 2692-99 G co CCGG 179.960 -999.990 ... V2 2010 03 15 12 24 00 47.8011 11.0245 941.00 936.00 5.00 291715 HPB 2010 02 01 11 55 00 3744-99 G co CCGG 179.970 -999.990 ... V2 2010 03 15 12 08 00 47.8011 11.0245 941.00 936.00 5.00 291714 HPB 2010 02 08 11 55 00 2910-99 G co CCGG 291.440 -999.990 .XC R5 2010 03 31 15 59 00 47.8011 11.0245 941.00 936.00 5.00 292688 HPB 2010 02 08 11 55 00 4877-99 G co CCGG 290.630 -999.990 .XC R5 2010 03 31 16 14 00 47.8011 11.0245 941.00 936.00 5.00 292689 HPB 2010 02 17 11 55 00 4237-99 G co CCGG 270.770 -999.990 .X. V2 2010 04 01 09 25 00 47.8011 11.0245 941.00 936.00 5.00 292691 HPB 2010 02 17 11 55 00 4566-99 G co CCGG 273.700 -999.990 .X. V2 2010 04 01 09 10 00 47.8011 11.0245 941.00 936.00 5.00 292690 HPB 2010 02 23 11 57 00 2474-99 G co CCGG 163.810 -999.990 ... V2 2010 04 01 09 40 00 47.8011 11.0245 941.00 936.00 5.00 292692 HPB 2010 02 23 11 57 00 4078-99 G co CCGG 162.580 -999.990 ... V2 2010 04 01 09 55 00 47.8011 11.0245 941.00 936.00 5.00 292693 HPB 2010 03 01 11 55 00 2914-99 G co CCGG 156.390 -999.990 ... V2 2010 04 01 10 26 00 47.8011 11.0245 941.00 936.00 5.00 292695 HPB 2010 03 01 11 55 00 4610-99 G co CCGG 156.760 -999.990 ... V2 2010 04 01 10 11 00 47.8011 11.0245 941.00 936.00 5.00 292694 HPB 2010 03 08 11 55 00 4201-99 G co CCGG 198.240 -999.990 ... V2 2010 04 12 13 31 00 47.8011 11.0245 941.00 936.00 5.00 293503 HPB 2010 03 08 11 55 00 4971-99 G co CCGG 197.900 -999.990 ... V2 2010 04 12 13 47 00 47.8011 11.0245 941.00 936.00 5.00 293504 HPB 2010 03 15 11 55 00 283-99 G co CCGG 190.520 -999.990 ... V2 2010 04 12 13 01 00 47.8011 11.0245 941.00 936.00 5.00 293505 HPB 2010 03 15 11 55 00 3991-99 G co CCGG 189.900 -999.990 ... V2 2010 04 12 13 16 00 47.8011 11.0245 941.00 936.00 5.00 293506 HPB 2010 03 22 11 55 00 2271-99 G co CCGG 159.490 -999.990 ... V2 2010 04 19 14 51 00 47.8011 11.0245 941.00 936.00 5.00 294534 HPB 2010 03 22 11 55 00 4691-99 G co CCGG 158.890 -999.990 ... V2 2010 04 19 15 06 00 47.8011 11.0245 941.00 936.00 5.00 294535 HPB 2010 03 29 11 55 00 4006-99 G co CCGG 141.590 -999.990 ... V2 2010 04 19 15 21 00 47.8011 11.0245 941.00 936.00 5.00 294532 HPB 2010 03 29 11 55 00 4674-99 G co CCGG 141.250 -999.990 ... V2 2010 04 19 15 37 00 47.8011 11.0245 941.00 936.00 5.00 294533 HPB 2010 04 07 11 55 00 12-99 G co CCGG 155.900 -999.990 ... R5 2010 05 18 10 01 00 47.8011 11.0245 941.00 936.00 5.00 296143 HPB 2010 04 07 11 55 00 696-99 G co CCGG 154.560 -999.990 ... R5 2010 05 18 10 15 00 47.8011 11.0245 941.00 936.00 5.00 296144 HPB 2010 04 12 11 55 00 1130-99 G co CCGG 192.200 -999.990 ... R5 2010 05 18 09 46 00 47.8011 11.0245 941.00 936.00 5.00 296142 HPB 2010 04 12 11 55 00 955-99 G co CCGG 191.780 -999.990 ... R5 2010 05 18 09 32 00 47.8011 11.0245 941.00 936.00 5.00 296141 HPB 2010 04 19 12 29 00 4400-99 G co CCGG 180.750 -999.990 ... R5 2010 05 24 13 47 00 47.8011 11.0245 941.00 936.00 5.00 296527 HPB 2010 04 19 12 29 00 668-99 G co CCGG 181.790 -999.990 ... R5 2010 05 24 14 01 00 47.8011 11.0245 941.00 936.00 5.00 296528 HPB 2010 04 27 11 55 00 6383-66 G co CCGG 178.100 -999.990 ... R5 2010 05 24 14 31 00 47.8011 11.0245 941.00 936.00 5.00 296529 HPB 2010 05 04 11 55 00 3035-99 G co CCGG 171.580 -999.990 ... V2 2010 05 27 16 10 00 47.8011 11.0245 941.00 936.00 5.00 297227 HPB 2010 05 04 11 55 00 4105-99 G co CCGG 170.520 -999.990 ... V2 2010 05 27 16 26 00 47.8011 11.0245 941.00 936.00 5.00 297228 HPB 2010 05 11 11 44 00 2625-99 G co CCGG 143.920 -999.990 ... V2 2010 05 28 11 07 00 47.8011 11.0245 941.00 936.00 5.00 297225 HPB 2010 05 11 11 44 00 4525-99 G co CCGG 143.620 -999.990 ... V2 2010 05 28 11 22 00 47.8011 11.0245 941.00 936.00 5.00 297226 HPB 2010 05 17 11 55 00 4215-99 G co CCGG 151.240 -999.990 ... R5 2010 06 11 13 00 00 47.8011 11.0245 941.00 936.00 5.00 298116 HPB 2010 05 17 11 55 00 4485-99 G co CCGG 151.090 -999.990 ... R5 2010 06 11 13 14 00 47.8011 11.0245 941.00 936.00 5.00 298117 HPB 2010 05 25 11 55 00 2798-99 G co CCGG 150.600 -999.990 ... R5 2010 06 11 12 30 00 47.8011 11.0245 941.00 936.00 5.00 298114 HPB 2010 05 25 11 55 00 3323-99 G co CCGG 150.530 -999.990 ... R5 2010 06 11 12 45 00 47.8011 11.0245 941.00 936.00 5.00 298115 HPB 2010 06 01 11 55 00 2136-99 G co CCGG 145.170 -999.990 ... V2 2010 07 09 13 39 00 47.8011 11.0245 941.00 936.00 5.00 299789 HPB 2010 06 01 11 55 00 53-99 G co CCGG 145.590 -999.990 ... V2 2010 07 09 13 24 00 47.8011 11.0245 941.00 936.00 5.00 299788 HPB 2010 06 08 11 55 00 3091-99 G co CCGG 121.340 -999.990 ... V2 2010 07 09 13 07 00 47.8011 11.0245 941.00 936.00 5.00 299787 HPB 2010 06 08 11 55 00 4395-99 G co CCGG 121.000 -999.990 ... V2 2010 07 09 12 52 00 47.8011 11.0245 941.00 936.00 5.00 299786 HPB 2010 06 15 11 55 00 2526-99 G co CCGG 150.870 -999.990 ... V2 2010 07 09 12 06 00 47.8011 11.0245 941.00 936.00 5.00 299785 HPB 2010 06 15 11 55 00 274-99 G co CCGG 151.570 -999.990 ... V2 2010 07 09 11 51 00 47.8011 11.0245 941.00 936.00 5.00 299784 HPB 2010 06 22 11 55 00 1131-99 G co CCGG 128.280 -999.990 ... V2 2010 07 09 12 21 00 47.8011 11.0245 941.00 936.00 5.00 299782 HPB 2010 06 22 11 55 00 3006-99 G co CCGG 127.550 -999.990 ... V2 2010 07 09 12 36 00 47.8011 11.0245 941.00 936.00 5.00 299783 HPB 2010 07 05 12 34 56 2721-99 G co CCGG 158.060 -999.990 ... R5 2010 07 29 14 05 00 47.8011 11.0245 941.00 936.00 5.00 300770 HPB 2010 07 05 12 34 56 3909-99 G co CCGG 158.350 -999.990 ... R5 2010 07 29 13 50 00 47.8011 11.0245 941.00 936.00 5.00 300769 HPB 2010 07 12 11 55 00 2921-99 G co CCGG 108.310 -999.990 ... R5 2010 07 29 13 29 00 47.8011 11.0245 941.00 936.00 5.00 300768 HPB 2010 07 12 11 55 00 3094-99 G co CCGG 108.630 -999.990 ... R5 2010 07 29 13 14 00 47.8011 11.0245 941.00 936.00 5.00 300767 HPB 2010 07 19 12 17 00 1129-99 G co CCGG 121.310 -999.990 ... R5 2010 08 19 12 17 00 47.8011 11.0245 941.00 936.00 5.00 302133 HPB 2010 07 19 12 17 00 4201-99 G co CCGG 120.140 -999.990 ... R5 2010 08 19 12 31 00 47.8011 11.0245 941.00 936.00 5.00 302134 HPB 2010 07 26 11 55 00 3623-99 G co CCGG 118.540 -999.990 ... R5 2010 08 19 11 47 00 47.8011 11.0245 941.00 936.00 5.00 302131 HPB 2010 07 26 11 55 00 4144-99 G co CCGG 118.780 -999.990 ... R5 2010 08 19 12 02 00 47.8011 11.0245 941.00 936.00 5.00 302132 HPB 2010 08 02 12 30 00 672-99 G co CCGG 112.820 -999.990 ... R5 2010 08 26 13 15 00 47.8011 11.0245 941.00 936.00 5.00 302477 HPB 2010 08 02 12 30 00 970-99 G co CCGG 112.050 -999.990 ... R5 2010 08 26 13 30 00 47.8011 11.0245 941.00 936.00 5.00 302478 HPB 2010 08 09 11 55 00 2558-99 G co CCGG 110.310 -999.990 ... R5 2010 08 26 13 00 00 47.8011 11.0245 941.00 936.00 5.00 302476 HPB 2010 08 09 11 55 00 688-99 G co CCGG 110.420 -999.990 ... R5 2010 08 26 12 45 00 47.8011 11.0245 941.00 936.00 5.00 302475 HPB 2010 08 16 12 12 00 4215-99 G co CCGG 116.160 -999.990 ... V2 2010 09 02 11 36 00 47.8011 11.0245 941.00 936.00 5.00 302980 HPB 2010 08 16 12 12 00 4485-99 G co CCGG 115.610 -999.990 ... V2 2010 09 02 11 51 00 47.8011 11.0245 941.00 936.00 5.00 302981 HPB 2010 08 23 11 55 00 2798-99 G co CCGG 122.700 -999.990 ... V2 2010 09 02 12 06 00 47.8011 11.0245 941.00 936.00 5.00 302978 HPB 2010 08 23 11 55 00 3323-99 G co CCGG 123.330 -999.990 ... V2 2010 09 02 12 22 00 47.8011 11.0245 941.00 936.00 5.00 302979 HPB 2010 08 31 11 55 00 1889-99 G co CCGG 119.920 -999.990 ... V2 2010 09 27 12 49 00 47.8011 11.0245 941.00 936.00 5.00 304361 HPB 2010 08 31 11 55 00 4250-99 G co CCGG 117.640 -999.990 ... V2 2010 09 27 12 34 00 47.8011 11.0245 941.00 936.00 5.00 304360 HPB 2010 09 06 12 10 00 1468-99 G co CCGG 143.850 -999.990 ... V2 2010 09 27 13 04 00 47.8011 11.0245 941.00 936.00 5.00 304362 HPB 2010 09 06 12 10 00 1513-99 G co CCGG 143.510 -999.990 ... V2 2010 09 27 13 20 00 47.8011 11.0245 941.00 936.00 5.00 304363 HPB 2010 09 13 11 55 00 3992-99 G co CCGG 145.740 -999.990 ... R5 2010 10 20 10 10 00 47.8011 11.0245 941.00 936.00 5.00 305769 HPB 2010 09 13 11 55 00 944-99 G co CCGG 146.380 -999.990 ... R5 2010 10 20 09 55 00 47.8011 11.0245 941.00 936.00 5.00 305768 HPB 2010 09 21 12 05 00 1275-99 G co CCGG 142.250 -999.990 ... R5 2010 10 20 10 39 00 47.8011 11.0245 941.00 936.00 5.00 305771 HPB 2010 09 21 12 05 00 1516-99 G co CCGG 141.120 -999.990 ... R5 2010 10 20 10 24 00 47.8011 11.0245 941.00 936.00 5.00 305770 HPB 2010 09 27 11 55 00 2516-99 G co CCGG 128.470 -999.990 ... R5 2010 10 20 14 51 00 47.8011 11.0245 941.00 936.00 5.00 305875 HPB 2010 09 27 11 55 00 4752-99 G co CCGG 128.720 -999.990 ... R5 2010 10 20 15 05 00 47.8011 11.0245 941.00 936.00 5.00 305876 HPB 2010 10 04 12 01 00 1460-99 G co CCGG 127.040 -999.990 ... R5 2010 10 20 15 20 00 47.8011 11.0245 941.00 936.00 5.00 305877 HPB 2010 10 04 12 01 00 5147-99 G co CCGG 125.980 -999.990 ... R5 2010 10 20 15 35 00 47.8011 11.0245 941.00 936.00 5.00 305878 HPB 2010 10 11 11 55 00 6072-66 G co CCGG 212.860 -999.990 .X. V2 2010 11 05 14 37 00 47.8011 11.0245 941.00 936.00 5.00 306989 HPB 2010 10 11 11 55 00 6366-66 G co CCGG 212.160 -999.990 .X. V2 2010 11 05 14 53 00 47.8011 11.0245 941.00 936.00 5.00 306990 HPB 2010 10 19 12 51 00 1113-99 G co CCGG 154.330 -999.990 ... V2 2010 11 05 14 07 00 47.8011 11.0245 941.00 936.00 5.00 306991 HPB 2010 10 19 12 51 00 2402-99 G co CCGG 153.850 -999.990 ... V2 2010 11 05 14 22 00 47.8011 11.0245 941.00 936.00 5.00 306992 HPB 2010 10 27 11 53 00 3876-99 G co CCGG 157.030 -999.990 ... R5 2010 12 03 14 22 00 47.8011 11.0245 941.00 936.00 5.00 308244 HPB 2010 10 27 11 53 00 4013-99 G co CCGG 156.340 -999.990 ... R5 2010 12 03 14 37 00 47.8011 11.0245 941.00 936.00 5.00 308243 HPB 2010 11 02 12 55 00 2514-99 G co CCGG 259.980 -999.990 .XC R5 2010 12 03 15 07 00 47.8011 11.0245 941.00 936.00 5.00 308245 HPB 2010 11 02 12 55 00 501-99 G co CCGG 260.630 -999.990 .XC R5 2010 12 03 14 53 00 47.8011 11.0245 941.00 936.00 5.00 308246 HPB 2010 11 10 11 55 00 4635-99 G co CCGG 158.000 -999.990 ... R5 2010 12 14 14 28 00 47.8011 11.0245 941.00 936.00 5.00 309174 HPB 2010 11 10 11 55 00 527-99 G co CCGG 160.700 -999.990 ... R5 2010 12 14 14 14 00 47.8011 11.0245 941.00 936.00 5.00 309173 HPB 2010 11 16 11 59 00 2498-99 G co CCGG 172.510 -999.990 ... R5 2010 12 14 14 43 00 47.8011 11.0245 941.00 936.00 5.00 309175 HPB 2010 11 16 11 59 00 589-99 G co CCGG 172.820 -999.990 ... R5 2010 12 14 14 58 00 47.8011 11.0245 941.00 936.00 5.00 309176 HPB 2010 11 22 12 12 00 4075-99 G co CCGG 261.780 -999.990 .XC R5 2011 01 07 13 11 00 47.8011 11.0245 941.00 936.00 5.00 310489 HPB 2010 11 22 12 12 00 658-99 G co CCGG 260.280 -999.990 .XC R5 2011 01 07 12 56 00 47.8011 11.0245 941.00 936.00 5.00 310490 HPB 2010 12 01 11 55 00 2844-99 G co CCGG 308.610 -999.990 .XC R5 2011 01 07 13 40 00 47.8011 11.0245 941.00 936.00 5.00 310487 HPB 2010 12 01 11 55 00 4220-99 G co CCGG 306.900 -999.990 .XC R5 2011 01 07 13 26 00 47.8011 11.0245 941.00 936.00 5.00 310488 HPB 2010 12 07 11 55 00 1016-99 G co CCGG 121.810 -999.990 ... R5 2011 01 20 10 40 00 47.8011 11.0245 941.00 936.00 5.00 311416 HPB 2010 12 07 11 55 00 1576-99 G co CCGG 122.530 -999.990 ... R5 2011 01 20 10 54 00 47.8011 11.0245 941.00 936.00 5.00 311417 HPB 2010 12 13 11 55 00 2545-99 G co CCGG 154.610 -999.990 ... R5 2011 01 20 10 10 00 47.8011 11.0245 941.00 936.00 5.00 311414 HPB 2010 12 13 11 55 00 4189-99 G co CCGG 153.990 -999.990 ... R5 2011 01 20 10 25 00 47.8011 11.0245 941.00 936.00 5.00 311415 HPB 2010 12 20 11 55 00 556-99 G co CCGG 147.240 -999.990 ... V2 2011 02 07 15 58 00 47.8011 11.0245 941.00 936.00 5.00 311942 HPB 2010 12 20 11 55 00 743-99 G co CCGG 145.960 -999.990 ... V2 2011 02 07 16 15 00 47.8011 11.0245 941.00 936.00 5.00 311943 HPB 2010 12 29 11 45 00 4842-99 G co CCGG 209.360 -999.990 +.. V2 2011 02 07 16 47 00 47.8011 11.0245 941.00 936.00 5.00 311938 HPB 2010 12 29 11 45 00 5152-99 G co CCGG 187.350 -999.990 -.. V2 2011 02 07 16 31 00 47.8011 11.0245 941.00 936.00 5.00 311939 HPB 2011 01 04 11 55 00 1800-99 G co CCGG 195.700 -999.990 -.. V2 2011 02 03 15 16 00 47.8011 11.0245 941.00 936.00 5.00 311928 HPB 2011 01 04 11 55 00 3628-99 G co CCGG 203.380 -999.990 +.. V2 2011 02 03 15 32 00 47.8011 11.0245 941.00 936.00 5.00 311929 HPB 2011 01 10 11 55 00 1916-99 G co CCGG 158.150 -999.990 ... V2 2011 02 03 15 48 00 47.8011 11.0245 941.00 936.00 5.00 311926 HPB 2011 01 10 11 55 00 2402-99 G co CCGG 157.480 -999.990 ... V2 2011 02 03 16 04 00 47.8011 11.0245 941.00 936.00 5.00 311927 HPB 2011 01 18 11 55 00 2340-99 G co CCGG 140.390 -999.990 ... V2 2011 02 28 12 46 00 47.8011 11.0245 941.00 936.00 5.00 313080 HPB 2011 01 18 11 55 00 254-99 G co CCGG 141.890 -999.990 ... V2 2011 02 28 12 30 00 47.8011 11.0245 941.00 936.00 5.00 313079 HPB 2011 01 25 11 50 00 2383-99 G co CCGG 188.380 -999.990 ... V2 2011 02 28 12 14 00 47.8011 11.0245 941.00 936.00 5.00 313083 HPB 2011 01 25 11 50 00 3319-99 G co CCGG 186.360 -999.990 ... V2 2011 02 28 11 58 00 47.8011 11.0245 941.00 936.00 5.00 313084 HPB 2011 02 01 11 55 00 2498-99 G co CCGG 426.100 -999.990 .X. V2 2011 03 10 11 52 00 47.8011 11.0245 941.00 936.00 5.00 313946 HPB 2011 02 01 11 55 00 3888-99 G co CCGG 425.360 -999.990 .X. V2 2011 03 10 11 36 00 47.8011 11.0245 941.00 936.00 5.00 313945 HPB 2011 02 09 11 55 00 2256-99 G co CCGG 157.680 -999.990 ... V2 2011 03 10 11 04 00 47.8011 11.0245 941.00 936.00 5.00 313944 HPB 2011 02 09 11 55 00 527-99 G co CCGG 159.540 -999.990 ... V2 2011 03 10 11 20 00 47.8011 11.0245 941.00 936.00 5.00 313943 HPB 2011 02 16 11 55 00 2005-99 G co CCGG 289.650 -999.990 .X. V2 2011 03 16 10 35 00 47.8011 11.0245 941.00 936.00 5.00 314131 HPB 2011 02 16 11 55 00 333-99 G co CCGG 290.950 -999.990 .X. V2 2011 03 16 10 19 00 47.8011 11.0245 941.00 936.00 5.00 314130 HPB 2011 02 21 11 55 00 1090-99 G co CCGG 342.120 -999.990 .X. V4 2011 03 16 10 48 00 47.8011 11.0245 941.00 936.00 5.00 314133 HPB 2011 02 21 11 55 00 4613-99 G co CCGG 342.290 -999.990 .X. V4 2011 03 16 10 33 00 47.8011 11.0245 941.00 936.00 5.00 314132 HPB 2011 03 01 11 55 00 2824-99 G co CCGG 329.210 -999.990 .X. V2 2011 03 23 13 23 00 47.8011 11.0245 941.00 936.00 5.00 314625 HPB 2011 03 01 11 55 00 3318-99 G co CCGG 328.750 -999.990 .X. V2 2011 03 23 13 39 00 47.8011 11.0245 941.00 936.00 5.00 314626 HPB 2011 03 08 11 55 00 4428-99 G co CCGG 232.570 -999.990 ... V2 2011 03 23 12 50 00 47.8011 11.0245 941.00 936.00 5.00 314623 HPB 2011 03 08 11 55 00 4770-99 G co CCGG 232.410 -999.990 ... V2 2011 03 23 13 06 00 47.8011 11.0245 941.00 936.00 5.00 314624 HPB 2011 03 15 11 55 00 3183-99 G co CCGG 143.130 -999.990 A.. V2 2011 04 13 11 08 00 47.8011 11.0245 941.00 936.00 5.00 315778 HPB 2011 03 15 11 55 00 3183-99 G co CCGG 157.300 -999.990 ... V2 2011 04 13 11 43 00 47.8011 11.0245 941.00 936.00 5.00 315778 HPB 2011 03 15 11 55 00 4833-99 G co CCGG 156.550 -999.990 ... V2 2011 04 13 10 52 00 47.8011 11.0245 941.00 936.00 5.00 315777 HPB 2011 03 21 11 55 00 3623-99 G co CCGG 173.800 -999.990 ... V4 2011 04 13 10 22 00 47.8011 11.0245 941.00 936.00 5.00 315779 HPB 2011 03 21 11 55 00 4144-99 G co CCGG 175.030 -999.990 ... V4 2011 04 13 10 37 00 47.8011 11.0245 941.00 936.00 5.00 315780 HPB 2011 03 28 11 55 00 3207-99 G co CCGG 161.510 -999.990 ... V2 2011 04 21 14 39 00 47.8011 11.0245 941.00 936.00 5.00 316141 HPB 2011 03 28 11 55 00 4886-99 G co CCGG 161.180 -999.990 ... V2 2011 04 21 14 55 00 47.8011 11.0245 941.00 936.00 5.00 316142 HPB 2011 04 04 11 55 00 1425-99 G co CCGG 156.440 -999.990 ... V2 2011 04 18 13 57 00 47.8011 11.0245 941.00 936.00 5.00 316135 HPB 2011 04 04 11 55 00 667-99 G co CCGG 156.540 -999.990 ... V2 2011 04 18 14 13 00 47.8011 11.0245 941.00 936.00 5.00 316136 HPB 2011 04 11 11 55 00 4214-99 G co CCGG 132.750 -999.990 ... V2 2011 05 03 17 00 00 47.8011 11.0245 941.00 936.00 5.00 317074 HPB 2011 04 11 11 55 00 451-99 G co CCGG 134.260 -999.990 ... V2 2011 05 03 17 16 00 47.8011 11.0245 941.00 936.00 5.00 317075 HPB 2011 04 18 11 55 00 2830-99 G co CCGG 166.380 -999.990 ... V2 2011 05 03 17 49 00 47.8011 11.0245 941.00 936.00 5.00 317073 HPB 2011 04 18 11 55 00 5144-99 G co CCGG 166.000 -999.990 ... V2 2011 05 03 17 32 00 47.8011 11.0245 941.00 936.00 5.00 317072 HPB 2011 04 26 11 55 00 1210-99 G co CCGG 175.370 -999.990 ... V2 2011 05 18 15 10 00 47.8011 11.0245 941.00 936.00 5.00 317743 HPB 2011 04 26 11 55 00 2891-99 G co CCGG 175.960 -999.990 ... V2 2011 05 18 15 27 00 47.8011 11.0245 941.00 936.00 5.00 317744 HPB 2011 05 02 11 55 00 2679-99 G co CCGG 166.060 -999.990 ... V2 2011 05 18 15 43 00 47.8011 11.0245 941.00 936.00 5.00 317741 HPB 2011 05 02 11 55 00 3624-99 G co CCGG 165.760 -999.990 ... V2 2011 05 18 15 59 00 47.8011 11.0245 941.00 936.00 5.00 317742 HPB 2011 05 09 11 55 00 1233-99 G co CCGG 162.880 -999.990 ... V4 2011 06 02 13 00 00 47.8011 11.0245 941.00 936.00 5.00 318480 HPB 2011 05 09 11 55 00 2561-99 G co CCGG 163.030 -999.990 ... V4 2011 06 02 13 15 00 47.8011 11.0245 941.00 936.00 5.00 318481 HPB 2011 05 16 11 55 00 3295-99 G co CCGG 145.210 -999.990 ... V4 2011 06 02 13 30 00 47.8011 11.0245 941.00 936.00 5.00 318478 HPB 2011 05 16 11 55 00 4614-99 G co CCGG 144.680 -999.990 ... V4 2011 06 02 13 45 00 47.8011 11.0245 941.00 936.00 5.00 318479 HPB 2011 05 23 12 29 00 2393-99 G co CCGG 133.470 -999.990 ... V4 2011 07 07 15 58 00 47.8011 11.0245 941.00 936.00 5.00 320132 HPB 2011 05 23 12 29 00 4908-99 G co CCGG 133.990 -999.990 ... V4 2011 07 07 16 14 00 47.8011 11.0245 941.00 936.00 5.00 320133 HPB 2011 05 30 11 55 00 2275-99 G co CCGG 131.230 -999.990 ... V4 2011 07 07 16 29 00 47.8011 11.0245 941.00 936.00 5.00 320135 HPB 2011 05 30 11 55 00 4180-99 G co CCGG 130.860 -999.990 ... V4 2011 07 07 16 44 00 47.8011 11.0245 941.00 936.00 5.00 320134 HPB 2011 06 06 11 55 00 3318-99 G co CCGG 124.970 -999.990 ... V4 2011 07 06 16 42 00 47.8011 11.0245 941.00 936.00 5.00 320076 HPB 2011 06 06 11 55 00 4770-99 G co CCGG 124.080 -999.990 ... V4 2011 07 06 16 57 00 47.8011 11.0245 941.00 936.00 5.00 320077 HPB 2011 06 14 11 55 00 2445-99 G co CCGG 103.050 -999.990 ... V4 2011 07 07 10 22 00 47.8011 11.0245 941.00 936.00 5.00 320074 HPB 2011 06 14 11 55 00 3791-99 G co CCGG 103.220 -999.990 ... V4 2011 07 07 10 37 00 47.8011 11.0245 941.00 936.00 5.00 320075 HPB 2011 06 20 11 55 00 1808-99 G co CCGG 103.740 -999.990 ... V4 2011 07 19 16 00 00 47.8011 11.0245 941.00 936.00 5.00 320489 HPB 2011 06 20 11 55 00 3597-99 G co CCGG 103.790 -999.990 ... V4 2011 07 19 16 15 00 47.8011 11.0245 941.00 936.00 5.00 320490 HPB 2011 06 27 11 55 00 3054-99 G co CCGG 118.390 -999.990 ... V4 2011 07 19 16 30 00 47.8011 11.0245 941.00 936.00 5.00 320491 HPB 2011 06 27 11 55 00 446-99 G co CCGG 118.790 -999.990 ... V4 2011 07 19 16 46 00 47.8011 11.0245 941.00 936.00 5.00 320492 HPB 2011 07 04 11 55 00 2589-99 G co CCGG 119.500 -999.990 ... V2 2011 08 04 14 33 00 47.8011 11.0245 941.00 936.00 5.00 321626 HPB 2011 07 04 11 55 00 2963-99 G co CCGG 118.720 -999.990 ... V2 2011 08 04 14 49 00 47.8011 11.0245 941.00 936.00 5.00 321627 HPB 2011 07 12 11 55 00 4540-99 G co CCGG 139.770 -999.990 ... V2 2011 08 04 14 01 00 47.8011 11.0245 941.00 936.00 5.00 321624 HPB 2011 07 12 11 55 00 6097-66 G co CCGG 140.040 -999.990 ... V2 2011 08 04 14 17 00 47.8011 11.0245 941.00 936.00 5.00 321625 HPB 2011 07 18 11 55 00 1413-99 G co CCGG 106.280 -999.990 ... V2 2011 08 17 14 52 00 47.8011 11.0245 941.00 936.00 5.00 322190 HPB 2011 07 18 11 55 00 5046-99 G co CCGG 106.110 -999.990 ... V2 2011 08 17 15 09 00 47.8011 11.0245 941.00 936.00 5.00 322191 HPB 2011 07 26 11 56 00 1484-99 G co CCGG 101.930 -999.990 ... V2 2011 08 17 14 36 00 47.8011 11.0245 941.00 936.00 5.00 322192 HPB 2011 07 26 11 56 00 3086-99 G co CCGG 101.150 -999.990 ... V2 2011 08 17 14 20 00 47.8011 11.0245 941.00 936.00 5.00 322193 HPB 2011 08 07 11 55 00 237-99 G co CCGG 140.430 -999.990 ... V2 2011 09 08 11 46 00 47.8011 11.0245 941.00 936.00 5.00 323045 HPB 2011 08 07 11 55 00 2691-99 G co CCGG 139.650 -999.990 ... V2 2011 09 08 11 30 00 47.8011 11.0245 941.00 936.00 5.00 323046 HPB 2011 08 09 11 55 00 2686-99 G co CCGG 99.330 -999.990 -.. V2 2011 09 06 11 46 00 47.8011 11.0245 941.00 936.00 5.00 323043 HPB 2011 08 09 11 55 00 583-99 G co CCGG 102.560 -999.990 +.. V2 2011 09 06 11 30 00 47.8011 11.0245 941.00 936.00 5.00 323044 HPB 2011 08 17 12 11 00 1233-99 G co CCGG 115.720 -999.990 ... V2 2011 09 09 11 01 00 47.8011 11.0245 941.00 936.00 5.00 323223 HPB 2011 08 17 12 11 00 2561-99 G co CCGG 116.070 -999.990 ... V2 2011 09 09 11 17 00 47.8011 11.0245 941.00 936.00 5.00 323224 HPB 2011 08 23 12 05 00 156-99 G co CCGG 103.410 -999.990 ... V2 2011 09 09 10 29 00 47.8011 11.0245 941.00 936.00 5.00 323221 HPB 2011 08 23 12 05 00 2332-99 G co CCGG 103.990 -999.990 ... V2 2011 09 09 10 45 00 47.8011 11.0245 941.00 936.00 5.00 323222 HPB 2011 08 31 11 55 00 2383-99 G co CCGG 116.870 -999.990 ... V4 2011 09 22 15 06 00 47.8011 11.0245 941.00 936.00 5.00 324077 HPB 2011 08 31 11 55 00 3254-99 G co CCGG 118.870 -999.990 ... V4 2011 09 22 15 21 00 47.8011 11.0245 941.00 936.00 5.00 324078 HPB 2011 09 08 11 56 00 3514-99 G co CCGG 104.000 -999.990 ... V4 2011 09 23 10 12 00 47.8011 11.0245 941.00 936.00 5.00 324079 HPB 2011 09 08 11 56 00 4528-99 G co CCGG 104.360 -999.990 ... V4 2011 09 23 10 27 00 47.8011 11.0245 941.00 936.00 5.00 324080 HPB 2011 09 12 11 55 00 3974-99 G co CCGG 101.240 -999.990 ... V4 2011 10 07 14 01 00 47.8011 11.0245 941.00 936.00 5.00 324997 HPB 2011 09 12 11 55 00 3976-99 G co CCGG 100.600 -999.990 ... V4 2011 10 07 14 16 00 47.8011 11.0245 941.00 936.00 5.00 324998 HPB 2011 09 21 12 06 00 1531-99 G co CCGG 125.110 -999.990 ... V4 2011 10 07 13 30 00 47.8011 11.0245 941.00 936.00 5.00 324999 HPB 2011 09 21 12 06 00 720-99 G co CCGG 125.070 -999.990 ... V4 2011 10 07 13 46 00 47.8011 11.0245 941.00 936.00 5.00 325000 HPB 2011 09 26 11 59 00 446-99 G co CCGG 136.220 -999.990 ... V4 2011 11 01 12 25 00 47.8011 11.0245 941.00 936.00 5.00 325593 HPB 2011 09 26 11 59 00 490-99 G co CCGG 136.650 -999.990 ... V4 2011 11 01 12 40 00 47.8011 11.0245 941.00 936.00 5.00 325594 HPB 2011 10 04 11 55 00 1448-99 G co CCGG 158.830 -999.990 ... V4 2011 11 01 12 56 00 47.8011 11.0245 941.00 936.00 5.00 325591 HPB 2011 10 04 11 55 00 4616-99 G co CCGG 158.370 -999.990 ... V4 2011 11 01 13 11 00 47.8011 11.0245 941.00 936.00 5.00 325592 HPB 2011 10 10 11 55 00 1315-99 G co CCGG 107.030 -999.990 ... V4 2011 11 03 17 03 00 47.8011 11.0245 941.00 936.00 5.00 325992 HPB 2011 10 10 11 55 00 5141-99 G co CCGG 106.750 -999.990 ... V4 2011 11 03 17 19 00 47.8011 11.0245 941.00 936.00 5.00 325993 HPB 2011 10 17 11 55 00 2881-99 G co CCGG 278.580 -999.990 +.. V2 2011 11 03 13 57 00 47.8011 11.0245 941.00 936.00 5.00 325994 HPB 2011 10 17 11 55 00 670-99 G co CCGG 157.240 -999.990 -.. V2 2011 11 03 13 41 00 47.8011 11.0245 941.00 936.00 5.00 325995 HPB 2011 10 24 11 55 00 2625-99 G co CCGG 166.940 -999.990 ... V4 2011 12 02 13 57 00 47.8011 11.0245 941.00 936.00 5.00 327309 HPB 2011 10 24 11 55 00 4392-99 G co CCGG 165.870 -999.990 ... V4 2011 12 02 14 12 00 47.8011 11.0245 941.00 936.00 5.00 327310 HPB 2011 11 02 11 55 00 1561-99 G co CCGG 187.310 -999.990 ... V4 2011 12 02 14 43 00 47.8011 11.0245 941.00 936.00 5.00 327308 HPB 2011 11 02 11 55 00 506-99 G co CCGG 186.270 -999.990 ... V4 2011 12 02 14 28 00 47.8011 11.0245 941.00 936.00 5.00 327307 HPB 2011 11 07 11 55 00 1799-99 G co CCGG 304.950 -999.990 .X. V2 2011 12 19 11 57 00 47.8011 11.0245 941.00 936.00 5.00 327864 HPB 2011 11 07 11 55 00 4110-99 G co CCGG 304.440 -999.990 .X. V2 2011 12 19 12 13 00 47.8011 11.0245 941.00 936.00 5.00 327865 HPB 2011 11 18 11 55 00 1044-99 G co CCGG 161.260 -999.990 +.. V2 2011 12 19 11 40 00 47.8011 11.0245 941.00 936.00 5.00 327863 HPB 2011 11 18 11 55 00 581-99 G co CCGG 131.460 -999.990 -.. V2 2011 12 19 11 24 00 47.8011 11.0245 941.00 936.00 5.00 327862 HPB 2011 11 25 11 55 00 1900-99 G co CCGG 152.940 -999.990 ... V2 2011 12 28 14 08 00 47.8011 11.0245 941.00 936.00 5.00 328247 HPB 2011 11 25 11 55 00 4619-99 G co CCGG 151.420 -999.990 ... V2 2011 12 28 14 24 00 47.8011 11.0245 941.00 936.00 5.00 328248 HPB 2011 11 30 11 55 00 2175-99 G co CCGG 147.240 -999.990 ... V2 2011 12 28 14 56 00 47.8011 11.0245 941.00 936.00 5.00 328250 HPB 2011 11 30 11 55 00 4190-99 G co CCGG 146.310 -999.990 ... V2 2011 12 28 14 40 00 47.8011 11.0245 941.00 936.00 5.00 328249 HPB 2011 12 06 11 55 00 4045-99 G co CCGG 135.430 -999.990 ... V2 2012 01 09 16 17 00 47.8011 11.0245 941.00 936.00 5.00 328866 HPB 2011 12 06 11 55 00 5099-99 G co CCGG 136.170 -999.990 ... V2 2012 01 09 16 33 00 47.8011 11.0245 941.00 936.00 5.00 328867 HPB 2011 12 13 11 55 00 1267-99 G co CCGG 120.400 -999.990 ... V2 2012 01 10 09 03 00 47.8011 11.0245 941.00 936.00 5.00 328864 HPB 2011 12 13 11 55 00 4294-99 G co CCGG 122.540 -999.990 ... V2 2012 01 10 09 20 00 47.8011 11.0245 941.00 936.00 5.00 328865 HPB 2011 12 19 11 55 00 2123-99 G co CCGG 144.930 -999.990 ... V4 2012 01 18 10 50 00 47.8011 11.0245 941.00 936.00 5.00 329414 HPB 2011 12 19 11 55 00 2660-99 G co CCGG 144.880 -999.990 ... V4 2012 01 18 11 05 00 47.8011 11.0245 941.00 936.00 5.00 329415 HPB 2011 12 27 12 03 00 3347-99 G co CCGG 194.030 -999.990 -.. V4 2012 01 18 11 20 00 47.8011 11.0245 941.00 936.00 5.00 329416 HPB 2011 12 27 12 03 00 3894-99 G co CCGG 200.290 -999.990 +.. V4 2012 01 18 11 36 00 47.8011 11.0245 941.00 936.00 5.00 329417 HPB 2012 01 02 11 55 00 3489-99 G co CCGG 133.970 -999.990 ... V4 2012 01 27 10 41 00 47.8011 11.0245 941.00 936.00 5.00 330205 HPB 2012 01 02 11 55 00 4726-99 G co CCGG 133.240 -999.990 ... V4 2012 01 27 10 56 00 47.8011 11.0245 941.00 936.00 5.00 330206 HPB 2012 01 09 11 55 00 2163-99 G co CCGG 161.350 -999.990 ... V2 2012 01 26 16 32 00 47.8011 11.0245 941.00 936.00 5.00 330208 HPB 2012 01 09 11 55 00 888-99 G co CCGG 161.280 -999.990 ... V2 2012 01 26 16 16 00 47.8011 11.0245 941.00 936.00 5.00 330207 HPB 2012 01 16 11 55 00 183-99 G co CCGG 186.810 -999.990 ... V4 2012 02 15 13 45 00 47.8011 11.0245 941.00 936.00 5.00 331268 HPB 2012 01 16 11 55 00 2264-99 G co CCGG 186.980 -999.990 ... V4 2012 02 15 14 00 00 47.8011 11.0245 941.00 936.00 5.00 331269 HPB 2012 01 25 11 55 00 814-99 G co CCGG 161.960 -999.990 ... V4 2012 02 15 13 29 00 47.8011 11.0245 941.00 936.00 5.00 331267 HPB 2012 01 25 11 55 00 912-99 G co CCGG 159.490 -999.990 ... V4 2012 02 15 13 14 00 47.8011 11.0245 941.00 936.00 5.00 331266 HPB 2012 02 01 13 05 00 3514-99 G co CCGG 328.140 -999.990 .X. V4 2012 02 22 13 25 00 47.8011 11.0245 941.00 936.00 5.00 331778 HPB 2012 02 01 13 05 00 6138-66 G co CCGG 329.110 -999.990 .X. V4 2012 02 22 13 40 00 47.8011 11.0245 941.00 936.00 5.00 331779 HPB 2012 02 07 12 00 00 1306-99 G co CCGG 434.420 -999.990 .X. V4 2012 02 22 12 54 00 47.8011 11.0245 941.00 936.00 5.00 331780 HPB 2012 02 07 12 00 00 5084-99 G co CCGG 434.270 -999.990 .X. V4 2012 02 22 13 10 00 47.8011 11.0245 941.00 936.00 5.00 331781 HPB 2012 02 14 11 59 00 4238-99 G co CCGG 237.210 -999.990 .X. V4 2012 03 14 12 51 00 47.8011 11.0245 941.00 936.00 5.00 332639 HPB 2012 02 20 11 55 00 274-99 G co CCGG 153.470 -999.990 ... V4 2012 03 14 12 20 00 47.8011 11.0245 941.00 936.00 5.00 332640 HPB 2012 02 20 11 55 00 4733-99 G co CCGG 151.610 -999.990 ... V4 2012 03 14 12 36 00 47.8011 11.0245 941.00 936.00 5.00 332641 HPB 2012 02 27 11 55 00 1017-99 G co CCGG 189.360 -999.990 ... V4 2012 04 06 10 35 00 47.8011 11.0245 941.00 936.00 5.00 333320 HPB 2012 02 27 11 55 00 1145-99 G co CCGG 188.690 -999.990 ... V4 2012 04 06 10 50 00 47.8011 11.0245 941.00 936.00 5.00 333321 HPB 2012 03 05 11 56 00 5151-99 G co CCGG 158.580 -999.990 +.. V4 2012 04 06 10 04 00 47.8011 11.0245 941.00 936.00 5.00 333318 HPB 2012 03 05 11 56 00 6262-66 G co CCGG 137.200 -999.990 -.. V4 2012 04 06 10 19 00 47.8011 11.0245 941.00 936.00 5.00 333319 HPB 2012 03 12 11 55 00 1572-99 G co CCGG 149.000 -999.990 -.. V4 2012 04 12 14 48 00 47.8011 11.0245 941.00 936.00 5.00 333884 HPB 2012 03 12 11 55 00 1672-99 G co CCGG 154.710 -999.990 +.. V4 2012 04 12 15 03 00 47.8011 11.0245 941.00 936.00 5.00 333885 HPB 2012 03 19 11 56 00 3366-99 G co CCGG 174.650 -999.990 ... V4 2012 04 12 14 18 00 47.8011 11.0245 941.00 936.00 5.00 333882 HPB 2012 03 19 11 56 00 552-99 G co CCGG 174.720 -999.990 ... V4 2012 04 12 14 33 00 47.8011 11.0245 941.00 936.00 5.00 333883 HPB 2012 03 26 11 55 00 4590-99 G co CCGG 140.310 -999.990 ... V2 2012 05 09 12 25 00 47.8011 11.0245 941.00 936.00 5.00 334923 HPB 2012 03 26 11 55 00 558-99 G co CCGG 140.350 -999.990 ... V2 2012 05 09 12 09 00 47.8011 11.0245 941.00 936.00 5.00 334922 HPB 2012 04 02 12 00 00 2360-99 G co CCGG 152.050 -999.990 ... V2 2012 05 08 14 36 00 47.8011 11.0245 941.00 936.00 5.00 334924 HPB 2012 04 02 12 00 00 2922-99 G co CCGG 150.760 -999.990 ... V2 2012 05 08 14 52 00 47.8011 11.0245 941.00 936.00 5.00 334925 HPB 2012 04 11 11 55 00 2555-99 G co CCGG 159.340 -999.990 ... V4 2012 05 15 13 15 00 47.8011 11.0245 941.00 936.00 5.00 335275 HPB 2012 04 11 11 55 00 363-99 G co CCGG 160.560 -999.990 ... V4 2012 05 15 13 00 00 47.8011 11.0245 941.00 936.00 5.00 335276 HPB 2012 04 18 12 11 00 253-99 G co CCGG 163.460 -999.990 ... V2 2012 05 14 16 15 00 47.8011 11.0245 941.00 936.00 5.00 335277 HPB 2012 04 18 12 11 00 6129-66 G co CCGG 162.610 -999.990 ... V2 2012 05 14 16 31 00 47.8011 11.0245 941.00 936.00 5.00 335278 HPB 2012 04 23 11 55 00 6494-66 G co CCGG 142.020 -999.990 ... V4 2012 05 23 12 47 00 47.8011 11.0245 941.00 936.00 5.00 335816 HPB 2012 04 23 11 55 00 6665-66 G co CCGG 143.490 -999.990 ... V4 2012 05 23 13 02 00 47.8011 11.0245 941.00 936.00 5.00 335817 HPB 2012 04 30 11 52 00 1468-99 G co CCGG 141.820 -999.990 ... V4 2012 05 23 13 18 00 47.8011 11.0245 941.00 936.00 5.00 335818 HPB 2012 04 30 11 52 00 2516-99 G co CCGG 141.740 -999.990 ... V4 2012 05 23 13 33 00 47.8011 11.0245 941.00 936.00 5.00 335819 HPB 2012 05 07 11 55 00 1510-99 G co CCGG 126.780 -999.990 +.. V4 2012 06 13 09 30 00 47.8011 11.0245 941.00 936.00 5.00 336729 HPB 2012 05 07 11 55 00 535-99 G co CCGG 121.390 -999.990 -.. V4 2012 06 13 09 15 00 47.8011 11.0245 941.00 936.00 5.00 336728 HPB 2012 05 14 11 55 00 3961-99 G co CCGG 132.770 -999.990 +.. V4 2012 06 13 08 44 00 47.8011 11.0245 941.00 936.00 5.00 336730 HPB 2012 05 14 11 55 00 5310-99 G co CCGG 128.010 -999.990 -.. V4 2012 06 13 09 00 00 47.8011 11.0245 941.00 936.00 5.00 336731 HPB 2012 05 21 11 55 00 4835-99 G co CCGG 121.720 -999.990 ... V4 2012 06 21 16 48 00 47.8011 11.0245 941.00 936.00 5.00 337285 HPB 2012 05 21 11 55 00 4951-99 G co CCGG 118.750 -999.990 ... V4 2012 06 21 17 04 00 47.8011 11.0245 941.00 936.00 5.00 337286 HPB 2012 06 04 12 34 00 508-99 G co CCGG 89.240 -999.990 +.. V4 2012 06 25 13 44 00 47.8011 11.0245 941.00 936.00 5.00 337283 HPB 2012 06 04 12 34 00 6195-66 G co CCGG 40.120 -999.990 -.. V4 2012 06 25 13 59 00 47.8011 11.0245 941.00 936.00 5.00 337284 HPB 2012 06 11 11 56 00 1972-99 G co CCGG 108.600 -999.990 ... V4 2012 07 13 11 14 00 47.8011 11.0245 941.00 936.00 5.00 338026 HPB 2012 06 11 11 56 00 74-99 G co CCGG 109.880 -999.990 ... V4 2012 07 13 11 30 00 47.8011 11.0245 941.00 936.00 5.00 338027 HPB 2012 06 20 11 55 00 2836-99 G co CCGG 126.090 -999.990 ... V4 2012 07 13 12 00 00 47.8011 11.0245 941.00 936.00 5.00 338023 HPB 2012 06 20 11 55 00 770-99 G co CCGG 125.790 -999.990 ... V4 2012 07 13 11 45 00 47.8011 11.0245 941.00 936.00 5.00 338022 HPB 2012 06 26 11 55 00 3153-99 G co CCGG 104.660 -999.990 ... V4 2012 08 07 14 22 00 47.8011 11.0245 941.00 936.00 5.00 338873 HPB 2012 06 26 11 55 00 4716-99 G co CCGG 103.710 -999.990 ... V4 2012 08 07 14 37 00 47.8011 11.0245 941.00 936.00 5.00 338874 HPB 2012 07 07 11 55 00 1633-99 G co CCGG 129.970 -999.990 ... V4 2012 08 02 16 35 00 47.8011 11.0245 941.00 936.00 5.00 338872 HPB 2012 07 07 11 55 00 584-99 G co CCGG 130.960 -999.990 ... V4 2012 08 02 16 20 00 47.8011 11.0245 941.00 936.00 5.00 338871 HPB 2012 07 09 11 59 00 2729-99 G co CCGG 105.980 -999.990 ... V4 2012 08 21 08 40 00 47.8011 11.0245 941.00 936.00 5.00 339532 HPB 2012 07 09 11 59 00 5127-99 G co CCGG 105.790 -999.990 ... V4 2012 08 21 08 55 00 47.8011 11.0245 941.00 936.00 5.00 339531 HPB 2012 07 16 11 57 00 2190-99 G co CCGG 104.700 -999.990 ... V4 2012 08 20 14 23 00 47.8011 11.0245 941.00 936.00 5.00 339529 HPB 2012 07 16 11 57 00 3778-99 G co CCGG 104.800 -999.990 ... V4 2012 08 20 14 38 00 47.8011 11.0245 941.00 936.00 5.00 339530 HPB 2012 07 23 11 55 00 1345-99 G co CCGG 110.760 -999.990 ... V4 2012 08 23 13 22 00 47.8011 11.0245 941.00 936.00 5.00 339817 HPB 2012 07 23 11 55 00 347-99 G co CCGG 110.720 -999.990 ... V4 2012 08 23 13 07 00 47.8011 11.0245 941.00 936.00 5.00 339816 HPB 2012 07 30 11 55 00 224-99 G co CCGG 123.230 -999.990 ... V4 2012 08 23 12 05 00 47.8011 11.0245 941.00 936.00 5.00 339818 HPB 2012 07 30 11 55 00 4691-99 G co CCGG 125.710 -999.990 ... V4 2012 08 23 12 21 00 47.8011 11.0245 941.00 936.00 5.00 339819 HPB 2012 08 06 11 55 00 2555-99 G co CCGG 118.500 -999.990 ... V4 2012 09 13 11 45 00 47.8011 11.0245 941.00 936.00 5.00 340839 HPB 2012 08 06 11 55 00 363-99 G co CCGG 117.440 -999.990 ... V4 2012 09 13 12 00 00 47.8011 11.0245 941.00 936.00 5.00 340840 HPB 2012 08 13 11 55 00 154-99 G co CCGG 125.860 -999.990 ... V4 2012 09 14 13 11 00 47.8011 11.0245 941.00 936.00 5.00 340838 HPB 2012 08 20 11 53 00 4540-99 G co CCGG 158.400 -999.990 ... V4 2012 10 02 16 27 00 47.8011 11.0245 941.00 936.00 5.00 341439 HPB 2012 08 20 11 53 00 5194-99 G co CCGG 158.080 -999.990 ... V4 2012 10 02 16 42 00 47.8011 11.0245 941.00 936.00 5.00 341440 HPB 2012 08 28 11 55 00 1054-99 G co CCGG 150.290 -999.990 ... V4 2012 09 27 15 00 00 47.8011 11.0245 941.00 936.00 5.00 341441 HPB 2012 08 28 11 55 00 3466-99 G co CCGG 150.930 -999.990 ... V4 2012 09 27 15 15 00 47.8011 11.0245 941.00 936.00 5.00 341442 HPB 2012 09 03 11 59 00 2566-99 G co CCGG 163.790 -999.990 ... V4 2012 10 11 10 51 00 47.8011 11.0245 941.00 936.00 5.00 342180 HPB 2012 09 03 11 59 00 3604-99 G co CCGG 165.110 -999.990 ... V4 2012 10 11 11 07 00 47.8011 11.0245 941.00 936.00 5.00 342181 HPB 2012 09 10 11 55 00 3228-99 G co CCGG 161.790 -999.990 ... V4 2012 10 10 16 43 00 47.8011 11.0245 941.00 936.00 5.00 342179 HPB 2012 09 10 11 55 00 4510-99 G co CCGG 162.470 -999.990 ... V4 2012 10 10 16 28 00 47.8011 11.0245 941.00 936.00 5.00 342178 HPB 2012 09 17 11 55 00 4657-99 G co CCGG 154.570 -999.990 ... V4 2012 10 24 09 45 00 47.8011 11.0245 941.00 936.00 5.00 342487 HPB 2012 09 17 11 55 00 916-99 G co CCGG 153.910 -999.990 ... V4 2012 10 24 09 30 00 47.8011 11.0245 941.00 936.00 5.00 342486 HPB 2012 09 24 11 55 00 1441-99 G co CCGG 120.510 -999.990 ... V4 2012 10 24 10 15 00 47.8011 11.0245 941.00 936.00 5.00 342485 HPB 2012 09 24 11 55 00 966-99 G co CCGG 120.590 -999.990 ... V4 2012 10 24 10 00 00 47.8011 11.0245 941.00 936.00 5.00 342484 HPB 2012 10 02 11 55 00 2892-99 G co CCGG 139.950 -999.990 ... V4 2012 11 07 10 58 00 47.8011 11.0245 941.00 936.00 5.00 343249 HPB 2012 10 02 11 55 00 4711-99 G co CCGG 139.910 -999.990 ... V4 2012 11 07 11 13 00 47.8011 11.0245 941.00 936.00 5.00 343250 HPB 2012 10 08 11 00 00 1747-99 G co CCGG 134.420 -999.990 ... V4 2012 11 07 11 29 00 47.8011 11.0245 941.00 936.00 5.00 343247 HPB 2012 10 08 11 00 00 2388-99 G co CCGG 134.060 -999.990 ... V4 2012 11 07 11 44 00 47.8011 11.0245 941.00 936.00 5.00 343248 HPB 2012 10 15 11 57 00 3632-99 G co CCGG 139.970 -999.990 ... V4 2012 11 16 13 41 00 47.8011 11.0245 941.00 936.00 5.00 343754 HPB 2012 10 15 11 57 00 4831-99 G co CCGG 140.570 -999.990 ... V4 2012 11 16 13 56 00 47.8011 11.0245 941.00 936.00 5.00 343755 HPB 2012 10 24 11 55 00 3346-99 G co CCGG 239.990 -999.990 .X. V4 2012 11 16 13 10 00 47.8011 11.0245 941.00 936.00 5.00 343752 HPB 2012 10 24 11 55 00 927-99 G co CCGG 240.410 -999.990 .X. V4 2012 11 16 13 26 00 47.8011 11.0245 941.00 936.00 5.00 343753 HPB 2012 10 29 11 55 00 2076-99 G co CCGG 160.910 -999.990 ... V4 2012 11 28 12 54 00 47.8011 11.0245 941.00 936.00 5.00 344089 HPB 2012 10 29 11 55 00 914-99 G co CCGG 159.580 -999.990 ... V4 2012 11 28 12 39 00 47.8011 11.0245 941.00 936.00 5.00 344090 HPB 2012 11 05 11 55 00 2533-99 G co CCGG 125.410 -999.990 ... V4 2012 11 28 13 24 00 47.8011 11.0245 941.00 936.00 5.00 344087 HPB 2012 11 05 11 55 00 452-99 G co CCGG 126.010 -999.990 ... V4 2012 11 28 13 09 00 47.8011 11.0245 941.00 936.00 5.00 344088 HPB 2012 11 12 11 55 00 1029-99 G co CCGG 168.260 -999.990 ... V2 2012 12 14 09 41 00 47.8011 11.0245 941.00 936.00 5.00 344704 HPB 2012 11 12 11 55 00 2293-99 G co CCGG 168.690 -999.990 ... V2 2012 12 14 09 58 00 47.8011 11.0245 941.00 936.00 5.00 344705 HPB 2012 11 19 11 55 00 154-99 G co CCGG 143.030 -999.990 ... V2 2012 12 14 10 14 00 47.8011 11.0245 941.00 936.00 5.00 344706 HPB 2012 11 19 11 55 00 6666-66 G co CCGG 143.160 -999.990 ... V2 2012 12 14 10 30 00 47.8011 11.0245 941.00 936.00 5.00 344707 HPB 2012 11 27 11 55 00 1066-99 G co CCGG 201.720 -999.990 .X. V2 2012 12 26 14 31 00 47.8011 11.0245 941.00 936.00 5.00 345272 HPB 2012 11 27 11 55 00 4319-99 G co CCGG 202.510 -999.990 .X. V2 2012 12 26 14 47 00 47.8011 11.0245 941.00 936.00 5.00 345273 HPB 2012 12 03 11 55 00 3624-99 G co CCGG 146.280 -999.990 ... V2 2012 12 26 15 03 00 47.8011 11.0245 941.00 936.00 5.00 345270 HPB 2012 12 03 11 55 00 4928-99 G co CCGG 146.960 -999.990 ... V2 2012 12 26 15 20 00 47.8011 11.0245 941.00 936.00 5.00 345271 HPB 2012 12 10 11 55 00 1576-99 G co CCGG 162.120 -999.990 ... V2 2013 01 17 12 30 00 47.8011 11.0245 941.00 936.00 5.00 346147 HPB 2012 12 10 11 55 00 1926-99 G co CCGG 163.240 -999.990 ... V2 2013 01 17 12 46 00 47.8011 11.0245 941.00 936.00 5.00 346148 HPB 2012 12 17 11 55 00 2258-99 G co CCGG 130.760 -999.990 ... V2 2013 01 17 13 03 00 47.8011 11.0245 941.00 936.00 5.00 346145 HPB 2012 12 17 11 55 00 2614-99 G co CCGG 131.620 -999.990 ... V2 2013 01 17 13 19 00 47.8011 11.0245 941.00 936.00 5.00 346146 HPB 2012 12 27 11 55 00 2279-99 G co CCGG 135.810 -999.990 ... V4 2013 01 24 12 16 00 47.8011 11.0245 941.00 936.00 5.00 346458 HPB 2012 12 27 11 55 00 4930-99 G co CCGG 135.080 -999.990 ... V4 2013 01 24 12 31 00 47.8011 11.0245 941.00 936.00 5.00 346459 HPB 2013 01 02 11 55 00 1780-99 G co CCGG 144.170 -999.990 ... V4 2013 01 24 11 45 00 47.8011 11.0245 941.00 936.00 5.00 346460 HPB 2013 01 02 11 55 00 4614-99 G co CCGG 143.820 -999.990 ... V4 2013 01 24 12 01 00 47.8011 11.0245 941.00 936.00 5.00 346461 HPB 2013 01 07 11 58 00 2028-99 G co CCGG 164.950 -999.990 ... V4 2013 02 04 11 46 00 47.8011 11.0245 941.00 936.00 5.00 347074 HPB 2013 01 07 11 58 00 257-99 G co CCGG 164.140 -999.990 ... V4 2013 02 04 11 31 00 47.8011 11.0245 941.00 936.00 5.00 347073 HPB 2013 01 15 11 55 00 3156-99 G co CCGG 287.970 -999.990 .X. V4 2013 02 04 12 16 00 47.8011 11.0245 941.00 936.00 5.00 347072 HPB 2013 01 15 11 55 00 5065-99 G co CCGG 288.720 -999.990 .X. V4 2013 02 04 12 01 00 47.8011 11.0245 941.00 936.00 5.00 347071 HPB 2013 01 21 11 55 00 552-99 G co CCGG 441.130 -999.990 .X. V2 2013 03 01 08 59 00 47.8011 11.0245 941.00 936.00 5.00 348037 HPB 2013 01 21 11 55 00 6162-66 G co CCGG 441.060 -999.990 .X. V2 2013 03 01 09 15 00 47.8011 11.0245 941.00 936.00 5.00 348038 HPB 2013 01 28 11 55 00 1518-99 G co CCGG 177.410 -999.990 ... V2 2013 02 26 11 25 00 47.8011 11.0245 941.00 936.00 5.00 348036 HPB 2013 01 28 11 55 00 241-99 G co CCGG 175.380 -999.990 ... V2 2013 02 26 11 08 00 47.8011 11.0245 941.00 936.00 5.00 348035 HPB 2013 02 04 11 55 00 3643-99 G co CCGG 157.030 -999.990 ... V2 2013 03 08 11 18 00 47.8011 11.0245 941.00 936.00 5.00 348292 HPB 2013 02 04 11 55 00 4416-99 G co CCGG 158.900 -999.990 ... V2 2013 03 08 11 34 00 47.8011 11.0245 941.00 936.00 5.00 348293 HPB 2013 02 11 11 55 00 2466-99 G co CCGG 209.640 -999.990 ... V2 2013 03 07 11 47 00 47.8011 11.0245 941.00 936.00 5.00 348290 HPB 2013 02 11 11 55 00 6232-66 G co CCGG 211.400 -999.990 ... V2 2013 03 07 12 03 00 47.8011 11.0245 941.00 936.00 5.00 348291 HPB 2013 02 18 11 55 00 3448-99 G co CCGG 246.960 -999.990 ... V2 2013 03 18 15 17 00 47.8011 11.0245 941.00 936.00 5.00 348713 HPB 2013 02 18 11 55 00 4691-99 G co CCGG 245.630 -999.990 ... V2 2013 03 18 15 33 00 47.8011 11.0245 941.00 936.00 5.00 348714 HPB 2013 02 27 11 55 00 3037-99 G co CCGG 484.380 -999.990 -.. V2 2013 03 18 16 06 00 47.8011 11.0245 941.00 936.00 5.00 348711 HPB 2013 02 27 11 55 00 6510-66 G co CCGG 488.540 -999.990 +.. V2 2013 03 18 15 50 00 47.8011 11.0245 941.00 936.00 5.00 348712 HPB 2013 03 04 11 55 00 1372-99 G co CCGG 259.620 -999.990 ... V2 2013 03 29 09 23 00 47.8011 11.0245 941.00 936.00 5.00 349372 HPB 2013 03 04 11 55 00 954-99 G co CCGG 261.750 -999.990 ... V2 2013 03 29 09 06 00 47.8011 11.0245 941.00 936.00 5.00 349371 HPB 2013 03 11 11 55 00 2985-99 G co CCGG 168.960 -999.990 ... V2 2013 03 29 09 39 00 47.8011 11.0245 941.00 936.00 5.00 349369 HPB 2013 03 11 11 55 00 4159-99 G co CCGG 168.230 -999.990 ... V2 2013 03 29 09 55 00 47.8011 11.0245 941.00 936.00 5.00 349370 HPB 2013 03 18 11 55 00 2646-99 G co CCGG 215.120 -999.990 +.. V4 2013 04 22 11 04 00 47.8011 11.0245 941.00 936.00 5.00 350385 HPB 2013 03 18 11 55 00 5074-99 G co CCGG 210.400 -999.990 -.. V4 2013 04 22 11 20 00 47.8011 11.0245 941.00 936.00 5.00 350386 HPB 2013 03 25 12 34 56 1009-99 G co CCGG 250.540 -999.990 ... V4 2013 04 22 18 32 00 47.8011 11.0245 941.00 936.00 5.00 350395 HPB 2013 03 25 12 34 56 4073-99 G co CCGG 251.070 -999.990 ... V4 2013 04 22 18 48 00 47.8011 11.0245 941.00 936.00 5.00 350396 HPB 2013 04 03 11 55 00 2526-99 G co CCGG 294.670 -999.990 .X. V4 2013 05 07 13 47 00 47.8011 11.0245 941.00 936.00 5.00 351015 HPB 2013 04 03 11 55 00 5309-99 G co CCGG 293.200 -999.990 .X. V4 2013 05 07 14 03 00 47.8011 11.0245 941.00 936.00 5.00 351016 HPB 2013 04 08 11 55 00 515-99 G co CCGG 224.450 -999.990 -.. V4 2013 05 07 14 35 00 47.8011 11.0245 941.00 936.00 5.00 351014 HPB 2013 04 08 11 55 00 5314-99 G co CCGG 228.410 -999.990 +.. V4 2013 05 07 14 19 00 47.8011 11.0245 941.00 936.00 5.00 351013 HPB 2013 04 15 11 53 00 1485-99 G co CCGG 147.130 -999.990 ... V2 2013 05 23 12 43 00 47.8011 11.0245 941.00 936.00 5.00 351824 HPB 2013 04 15 11 53 00 2543-99 G co CCGG 146.250 -999.990 ... V2 2013 05 23 12 59 00 47.8011 11.0245 941.00 936.00 5.00 351825 HPB 2013 04 22 11 55 00 3003-99 G co CCGG 188.800 -999.990 -.. V2 2013 05 23 13 15 00 47.8011 11.0245 941.00 936.00 5.00 351826 HPB 2013 04 22 11 55 00 4628-99 G co CCGG 190.800 -999.990 +.. V2 2013 05 23 13 31 00 47.8011 11.0245 941.00 936.00 5.00 351827 HPB 2013 04 29 11 55 00 407-99 G co CCGG 201.260 -999.990 ... V4 2013 05 29 14 56 00 47.8011 11.0245 941.00 936.00 5.00 352182 HPB 2013 04 29 11 55 00 4627-99 G co CCGG 200.150 -999.990 ... V4 2013 05 29 15 12 00 47.8011 11.0245 941.00 936.00 5.00 352183 HPB 2013 05 06 11 55 00 225-99 G co CCGG 175.350 -999.990 ... V4 2013 05 29 12 48 00 47.8011 11.0245 941.00 936.00 5.00 352180 HPB 2013 05 06 11 55 00 2256-99 G co CCGG 173.910 -999.990 ... V4 2013 05 29 13 04 00 47.8011 11.0245 941.00 936.00 5.00 352181 HPB 2013 05 13 11 55 00 2952-99 G co CCGG 132.840 -999.990 ... V4 2013 06 18 11 13 00 47.8011 11.0245 941.00 936.00 5.00 353504 HPB 2013 05 13 11 55 00 3317-99 G co CCGG 133.320 -999.990 ... V4 2013 06 18 11 29 00 47.8011 11.0245 941.00 936.00 5.00 353505 HPB 2013 05 21 11 55 00 4401-99 G co CCGG 130.300 -999.990 ... V4 2013 06 18 10 41 00 47.8011 11.0245 941.00 936.00 5.00 353502 HPB 2013 05 21 11 55 00 4481-99 G co CCGG 130.070 -999.990 ... V4 2013 06 18 10 57 00 47.8011 11.0245 941.00 936.00 5.00 353503 HPB 2013 05 27 11 55 00 3526-99 G co CCGG 120.720 -999.990 ... V4 2013 06 18 10 09 00 47.8011 11.0245 941.00 936.00 5.00 353498 HPB 2013 05 27 11 55 00 4753-99 G co CCGG 120.520 -999.990 ... V4 2013 06 18 10 25 00 47.8011 11.0245 941.00 936.00 5.00 353499 HPB 2013 06 03 11 55 00 1794-99 G co CCGG 121.040 -999.990 ... V4 2013 06 17 14 09 00 47.8011 11.0245 941.00 936.00 5.00 353500 HPB 2013 06 03 11 55 00 4686-99 G co CCGG 120.630 -999.990 ... V4 2013 06 17 14 25 00 47.8011 11.0245 941.00 936.00 5.00 353501 HPB 2013 06 10 11 56 00 2182-99 G co CCGG 120.030 -999.990 ... V4 2013 07 16 11 38 00 47.8011 11.0245 941.00 936.00 5.00 354320 HPB 2013 06 10 11 56 00 557-99 G co CCGG 120.320 -999.990 ... V4 2013 07 16 11 22 00 47.8011 11.0245 941.00 936.00 5.00 354319 HPB 2013 06 17 11 57 00 519-99 G co CCGG 124.400 -999.990 ... V4 2013 07 16 11 54 00 47.8011 11.0245 941.00 936.00 5.00 354321 HPB 2013 06 17 11 57 00 633-99 G co CCGG 124.100 -999.990 ... V4 2013 07 16 12 10 00 47.8011 11.0245 941.00 936.00 5.00 354322 HPB 2013 06 26 11 55 00 3766-99 G co CCGG 105.510 -999.990 ... V4 2013 08 14 15 55 00 47.8011 11.0245 941.00 936.00 5.00 355905 HPB 2013 06 26 11 55 00 535-99 G co CCGG 106.680 -999.990 ... V4 2013 08 14 15 39 00 47.8011 11.0245 941.00 936.00 5.00 355904 HPB 2013 07 01 11 55 00 4896-99 G co CCGG 116.910 -999.990 ... V4 2013 08 14 16 27 00 47.8011 11.0245 941.00 936.00 5.00 355901 HPB 2013 07 01 11 55 00 770-99 G co CCGG 118.460 -999.990 ... V4 2013 08 14 16 11 00 47.8011 11.0245 941.00 936.00 5.00 355900 HPB 2013 07 08 11 55 00 2896-99 G co CCGG 130.280 -999.990 ... V4 2013 08 14 15 07 00 47.8011 11.0245 941.00 936.00 5.00 355897 HPB 2013 07 08 11 55 00 5172-99 G co CCGG 130.220 -999.990 ... V4 2013 08 14 15 23 00 47.8011 11.0245 941.00 936.00 5.00 355898 HPB 2013 07 15 11 55 00 1295-99 G co CCGG 144.830 -999.990 ... V4 2013 08 14 14 35 00 47.8011 11.0245 941.00 936.00 5.00 355893 HPB 2013 07 15 11 55 00 1913-99 G co CCGG 144.910 -999.990 ... V4 2013 08 14 14 51 00 47.8011 11.0245 941.00 936.00 5.00 355894 HPB 2013 07 22 11 55 00 3275-99 G co CCGG 122.480 -999.990 ... V4 2013 08 23 15 57 00 47.8011 11.0245 941.00 936.00 5.00 356386 HPB 2013 07 22 11 55 00 4116-99 G co CCGG 122.350 -999.990 ... V4 2013 08 23 16 13 00 47.8011 11.0245 941.00 936.00 5.00 356387 HPB 2013 07 30 12 12 00 1832-99 G co CCGG 112.620 -999.990 ... V4 2013 08 23 15 25 00 47.8011 11.0245 941.00 936.00 5.00 356388 HPB 2013 07 30 12 12 00 4299-99 G co CCGG 111.400 -999.990 ... V4 2013 08 23 15 41 00 47.8011 11.0245 941.00 936.00 5.00 356389 HPB 2013 08 05 11 55 00 1569-99 G co CCGG 117.300 -999.990 ... V4 2013 09 26 15 11 00 47.8011 11.0245 941.00 936.00 5.00 357269 HPB 2013 08 05 11 55 00 3088-99 G co CCGG 118.240 -999.990 ... V4 2013 09 26 15 27 00 47.8011 11.0245 941.00 936.00 5.00 357270 HPB 2013 08 12 11 55 00 4184-99 G co CCGG 117.270 -999.990 ... V4 2013 09 26 15 59 00 47.8011 11.0245 941.00 936.00 5.00 357268 HPB 2013 08 12 11 55 00 711-99 G co CCGG 117.490 -999.990 ... V4 2013 09 26 15 43 00 47.8011 11.0245 941.00 936.00 5.00 357267 HPB 2013 08 20 11 57 00 2593-99 G co CCGG 120.230 -999.990 +.. V3 2013 10 22 15 44 00 47.8011 11.0245 941.00 936.00 5.00 357822 HPB 2013 08 20 11 57 00 3811-99 G co CCGG 117.150 -999.990 -.. V3 2013 10 22 16 01 00 47.8011 11.0245 941.00 936.00 5.00 357823 HPB 2013 08 26 11 55 00 2944-99 G co CCGG 123.780 -999.990 ... V4 2013 10 22 15 45 00 47.8011 11.0245 941.00 936.00 5.00 357824 HPB 2013 08 26 11 55 00 3005-99 G co CCGG 123.340 -999.990 ... V4 2013 10 22 16 01 00 47.8011 11.0245 941.00 936.00 5.00 357825 HPB 2013 09 02 11 55 00 1656-99 G co CCGG 119.880 -999.990 ... V3 2013 10 30 13 09 00 47.8011 11.0245 941.00 936.00 5.00 358571 HPB 2013 09 02 11 55 00 4891-99 G co CCGG 119.250 -999.990 ... V3 2013 10 30 12 53 00 47.8011 11.0245 941.00 936.00 5.00 358570 HPB 2013 09 11 11 55 00 3497-99 G co CCGG 110.190 -999.990 ... V4 2013 10 30 12 22 00 47.8011 11.0245 941.00 936.00 5.00 358572 HPB 2013 09 11 11 55 00 3805-99 G co CCGG 110.020 -999.990 ... V4 2013 10 30 12 38 00 47.8011 11.0245 941.00 936.00 5.00 358573 HPB 2013 09 16 11 55 00 4183-99 G co CCGG 114.390 -999.990 ... V3 2013 10 30 14 14 00 47.8011 11.0245 941.00 936.00 5.00 358575 HPB 2013 09 16 11 55 00 427-99 G co CCGG 114.930 -999.990 ... V3 2013 10 30 13 57 00 47.8011 11.0245 941.00 936.00 5.00 358574 HPB 2013 09 23 11 55 00 2571-99 G co CCGG 141.330 -999.990 ... V3 2013 10 30 13 41 00 47.8011 11.0245 941.00 936.00 5.00 358576 HPB 2013 09 23 11 55 00 707-99 G co CCGG 141.560 -999.990 ... V3 2013 10 30 13 25 00 47.8011 11.0245 941.00 936.00 5.00 358577 HPB 2013 10 01 11 55 00 1878-99 G co CCGG 155.650 -999.990 ... V3 2013 11 15 09 34 00 47.8011 11.0245 941.00 936.00 5.00 359804 HPB 2013 10 01 11 55 00 2971-99 G co CCGG 155.950 -999.990 ... V3 2013 11 15 09 50 00 47.8011 11.0245 941.00 936.00 5.00 359803 HPB 2013 10 07 11 55 00 1533-99 G co CCGG 234.930 -999.990 .X. V3 2013 11 15 10 06 00 47.8011 11.0245 941.00 936.00 5.00 359805 HPB 2013 10 07 11 55 00 2068-99 G co CCGG 235.220 -999.990 .X. V3 2013 11 15 10 22 00 47.8011 11.0245 941.00 936.00 5.00 359806 HPB 2013 10 14 12 01 00 4553-99 G co CCGG 131.910 -999.990 ... V4 2013 11 20 10 45 00 47.8011 11.0245 941.00 936.00 5.00 360174 HPB 2013 10 14 12 01 00 5397-99 G co CCGG 131.130 -999.990 ... V4 2013 11 20 10 29 00 47.8011 11.0245 941.00 936.00 5.00 360175 HPB 2013 10 21 11 55 00 2074-99 G co CCGG 107.640 -999.990 ... V4 2013 11 20 09 57 00 47.8011 11.0245 941.00 936.00 5.00 360172 HPB 2013 10 21 11 55 00 2986-99 G co CCGG 105.650 -999.990 ... V4 2013 11 20 10 13 00 47.8011 11.0245 941.00 936.00 5.00 360173 HPB 2013 10 30 11 55 00 1926-99 G co CCGG 114.940 -999.990 ... V4 2013 12 02 10 19 00 47.8011 11.0245 941.00 936.00 5.00 360673 HPB 2013 10 30 11 55 00 2272-99 G co CCGG 115.280 -999.990 ... V4 2013 12 02 10 35 00 47.8011 11.0245 941.00 936.00 5.00 360674 HPB 2013 11 05 11 55 00 1816-99 G co CCGG 126.710 -999.990 ... V4 2013 12 02 10 03 00 47.8011 11.0245 941.00 936.00 5.00 360676 HPB 2013 11 05 11 55 00 406-99 G co CCGG 127.730 -999.990 ... V4 2013 12 02 09 47 00 47.8011 11.0245 941.00 936.00 5.00 360675 HPB 2013 11 11 11 55 00 2755-99 G co CCGG 133.860 -999.990 ... V4 2013 12 16 11 13 00 47.8011 11.0245 941.00 936.00 5.00 361248 HPB 2013 11 11 11 55 00 6871-66 G co CCGG 134.660 -999.990 ... V4 2013 12 16 11 29 00 47.8011 11.0245 941.00 936.00 5.00 361249 HPB 2013 11 19 11 55 00 1089-99 G co CCGG 296.490 -999.990 .X. V4 2013 12 16 11 45 00 47.8011 11.0245 941.00 936.00 5.00 361246 HPB 2013 11 19 11 55 00 1778-99 G co CCGG 293.870 -999.990 .X. V4 2013 12 16 12 01 00 47.8011 11.0245 941.00 936.00 5.00 361247 HPB 2013 11 25 11 55 00 1787-99 G co CCGG 136.060 -999.990 ..< V4 2013 12 19 15 12 00 47.8011 11.0245 941.00 936.00 5.00 361726 HPB 2013 11 25 11 55 00 1787-99 G co CCGG 136.520 -999.990 ... V4 2013 12 19 16 10 00 47.8011 11.0245 941.00 936.00 5.00 361726 HPB 2013 11 25 11 55 00 179-99 G co CCGG 136.600 -999.990 ... V4 2013 12 19 14 56 00 47.8011 11.0245 941.00 936.00 5.00 361727 HPB 2013 12 02 11 55 00 3194-99 G co CCGG 165.980 -999.990 ... V4 2013 12 19 14 40 00 47.8011 11.0245 941.00 936.00 5.00 361729 HPB 2013 12 02 11 55 00 6113-66 G co CCGG 165.310 -999.990 ... V4 2013 12 19 14 24 00 47.8011 11.0245 941.00 936.00 5.00 361728 HPB 2013 12 09 11 55 00 157-99 G co CCGG 134.450 -999.990 -.. V4 2014 01 10 09 02 00 47.8011 11.0245 941.00 936.00 5.00 362382 HPB 2013 12 09 11 55 00 4027-99 G co CCGG 137.630 -999.990 +.. V4 2014 01 10 09 18 00 47.8011 11.0245 941.00 936.00 5.00 362383 HPB 2013 12 16 11 55 00 1185-99 G co CCGG 112.290 -999.990 ... V4 2014 01 10 09 50 00 47.8011 11.0245 941.00 936.00 5.00 362380 HPB 2013 12 16 11 55 00 205-99 G co CCGG 112.920 -999.990 ... V4 2014 01 10 09 34 00 47.8011 11.0245 941.00 936.00 5.00 362381 HPB 2013 12 23 11 55 00 2675-99 G co CCGG 137.630 -999.990 ... V3 2014 02 07 15 04 00 47.8011 11.0245 941.00 936.00 5.00 363542 HPB 2013 12 23 11 55 00 3612-99 G co CCGG 138.990 -999.990 ... V3 2014 02 07 15 20 00 47.8011 11.0245 941.00 936.00 5.00 363543 HPB 2013 12 30 11 55 00 4074-99 G co CCGG 161.520 -999.990 ... V3 2014 02 07 14 48 00 47.8011 11.0245 941.00 936.00 5.00 363541 HPB 2013 12 30 11 55 00 527-99 G co CCGG 162.190 -999.990 ... V3 2014 02 07 14 31 00 47.8011 11.0245 941.00 936.00 5.00 363540 HPB 2014 01 07 11 55 00 4796-99 G co CCGG 112.950 -999.990 ... V3 2014 03 03 14 52 00 47.8011 11.0245 941.00 936.00 5.00 364677 HPB 2014 01 07 11 55 00 6546-66 G co CCGG 113.440 -999.990 ... V3 2014 03 03 14 36 00 47.8011 11.0245 941.00 936.00 5.00 364676 HPB 2014 01 13 11 55 00 2077-99 G co CCGG 137.030 -999.990 ... V4 2014 02 28 13 20 00 47.8011 11.0245 941.00 936.00 5.00 364672 HPB 2014 01 13 11 55 00 3512-99 G co CCGG 137.260 -999.990 ... V4 2014 02 28 13 36 00 47.8011 11.0245 941.00 936.00 5.00 364673 HPB 2014 01 20 11 56 00 4183-99 G co CCGG 313.350 -999.990 .X. V3 2014 03 03 15 57 00 47.8011 11.0245 941.00 936.00 5.00 364675 HPB 2014 01 20 11 56 00 764-99 G co CCGG 311.360 -999.990 .X. V3 2014 03 03 15 40 00 47.8011 11.0245 941.00 936.00 5.00 364674 HPB 2014 01 27 11 55 00 427-99 G co CCGG 141.640 -999.990 ... V3 2014 03 03 15 08 00 47.8011 11.0245 941.00 936.00 5.00 364678 HPB 2014 01 27 11 55 00 4905-99 G co CCGG 140.300 -999.990 ... V3 2014 03 03 15 24 00 47.8011 11.0245 941.00 936.00 5.00 364679 HPB 2014 02 03 11 55 00 2152-99 G co CCGG 392.230 -999.990 .X. V3 2014 03 05 13 21 00 47.8011 11.0245 941.00 936.00 5.00 365047 HPB 2014 02 03 11 55 00 2773-99 G co CCGG 393.970 -999.990 .X. V3 2014 03 05 13 37 00 47.8011 11.0245 941.00 936.00 5.00 365048 HPB 2014 02 10 11 55 00 1664-99 G co CCGG 136.820 -999.990 ... V3 2014 03 05 13 53 00 47.8011 11.0245 941.00 936.00 5.00 365009 HPB 2014 02 10 11 55 00 3108-99 G co CCGG 136.450 -999.990 ... V3 2014 03 05 14 09 00 47.8011 11.0245 941.00 936.00 5.00 365010 HPB 2014 02 17 11 55 00 2973-99 G co CCGG 157.690 -999.990 ... V3 2014 03 17 11 29 00 47.8011 11.0245 941.00 936.00 5.00 365310 HPB 2014 02 17 11 55 00 5172-99 G co CCGG 158.270 -999.990 ... V3 2014 03 17 11 45 00 47.8011 11.0245 941.00 936.00 5.00 365311 HPB 2014 02 25 11 55 00 2333-99 G co CCGG 148.100 -999.990 ... V3 2014 03 17 10 57 00 47.8011 11.0245 941.00 936.00 5.00 365312 HPB 2014 02 25 11 55 00 3174-99 G co CCGG 148.940 -999.990 ... V3 2014 03 17 11 13 00 47.8011 11.0245 941.00 936.00 5.00 365313 HPB 2014 03 03 11 55 00 1574-99 G co CCGG 173.100 -999.990 ... V4 2014 04 09 10 43 00 47.8011 11.0245 941.00 936.00 5.00 366218 HPB 2014 03 03 11 55 00 3239-99 G co CCGG 173.140 -999.990 ... V4 2014 04 09 10 59 00 47.8011 11.0245 941.00 936.00 5.00 366219 HPB 2014 03 10 11 55 00 1363-99 G co CCGG 205.430 -999.990 ... V4 2014 04 09 10 11 00 47.8011 11.0245 941.00 936.00 5.00 366220 HPB 2014 03 10 11 55 00 5322-99 G co CCGG 205.550 -999.990 ... V4 2014 04 09 10 27 00 47.8011 11.0245 941.00 936.00 5.00 366221 HPB 2014 03 17 11 55 00 4997-99 G co CCGG 129.300 -999.990 ... V4 2014 04 17 12 39 00 47.8011 11.0245 941.00 936.00 5.00 366652 HPB 2014 03 17 11 55 00 4998-99 G co CCGG 129.180 -999.990 ... V4 2014 04 17 12 55 00 47.8011 11.0245 941.00 936.00 5.00 366653 HPB 2014 03 24 11 56 00 2045-99 G co CCGG 151.300 -999.990 ... V4 2014 04 17 10 31 00 47.8011 11.0245 941.00 936.00 5.00 366650 HPB 2014 03 24 11 56 00 2046-99 G co CCGG 152.460 -999.990 ... V4 2014 04 17 10 47 00 47.8011 11.0245 941.00 936.00 5.00 366651 HPB 2014 04 01 11 55 00 2955-99 G co CCGG 184.300 -999.990 ... V4 2014 05 16 11 36 00 47.8011 11.0245 941.00 936.00 5.00 367664 HPB 2014 04 01 11 55 00 2956-99 G co CCGG 184.290 -999.990 ... V4 2014 05 16 11 52 00 47.8011 11.0245 941.00 936.00 5.00 367665 HPB 2014 04 08 11 55 00 3963-99 G co CCGG 131.320 -999.990 ... V4 2014 05 16 11 04 00 47.8011 11.0245 941.00 936.00 5.00 367662 HPB 2014 04 08 11 55 00 3964-99 G co CCGG 132.800 -999.990 ... V4 2014 05 16 11 20 00 47.8011 11.0245 941.00 936.00 5.00 367663 HPB 2014 04 14 11 55 00 5286-99 G co CCGG 138.920 -999.990 ... V4 2014 05 13 11 47 00 47.8011 11.0245 941.00 936.00 5.00 367457 HPB 2014 04 14 11 55 00 970-99 G co CCGG 139.250 -999.990 ... V4 2014 05 13 11 31 00 47.8011 11.0245 941.00 936.00 5.00 367456 HPB 2014 04 22 11 55 00 3275-99 G co CCGG 148.660 -999.990 ... V4 2014 05 13 10 59 00 47.8011 11.0245 941.00 936.00 5.00 367454 HPB 2014 04 22 11 55 00 5326-99 G co CCGG 148.900 -999.990 ... V4 2014 05 13 11 15 00 47.8011 11.0245 941.00 936.00 5.00 367455 HPB 2014 04 28 11 57 00 2969-99 G co CCGG 144.680 -999.990 ... V4 2014 06 11 11 03 00 47.8011 11.0245 941.00 936.00 5.00 368549 HPB 2014 04 28 11 57 00 3563-99 G co CCGG 145.590 -999.990 ... V4 2014 06 11 11 19 00 47.8011 11.0245 941.00 936.00 5.00 368550 HPB 2014 05 05 11 55 00 312-99 G co CCGG 142.690 -999.990 ... V4 2014 06 11 12 23 00 47.8011 11.0245 941.00 936.00 5.00 368548 HPB 2014 05 05 11 55 00 954-99 G co CCGG 142.800 -999.990 ... V4 2014 06 11 12 07 00 47.8011 11.0245 941.00 936.00 5.00 368547 HPB 2014 05 12 11 55 00 2489-99 G co CCGG 125.790 -999.990 ... V4 2014 06 19 16 16 00 47.8011 11.0245 941.00 936.00 5.00 369014 HPB 2014 05 12 11 55 00 998-99 G co CCGG 126.420 -999.990 ... V4 2014 06 19 16 00 00 47.8011 11.0245 941.00 936.00 5.00 369013 HPB 2014 05 19 11 55 00 1089-99 G co CCGG 135.180 -999.990 ... V4 2014 06 19 16 32 00 47.8011 11.0245 941.00 936.00 5.00 369015 HPB 2014 05 19 11 55 00 1778-99 G co CCGG 135.380 -999.990 ... V4 2014 06 19 16 48 00 47.8011 11.0245 941.00 936.00 5.00 369016 HPB 2014 05 26 11 57 00 1505-99 G co CCGG 138.670 -999.990 ... V4 2014 07 02 11 54 00 47.8011 11.0245 941.00 936.00 5.00 369430 HPB 2014 05 26 11 57 00 1970-99 G co CCGG 137.090 -999.990 ... V4 2014 07 02 12 10 00 47.8011 11.0245 941.00 936.00 5.00 369431 HPB 2014 06 02 12 34 56 3816-99 G co CCGG 130.130 -999.990 ... V4 2014 07 02 11 22 00 47.8011 11.0245 941.00 936.00 5.00 369432 HPB 2014 06 02 12 34 56 4763-99 G co CCGG 130.230 -999.990 ... V4 2014 07 02 11 38 00 47.8011 11.0245 941.00 936.00 5.00 369433 HPB 2014 06 10 11 55 00 1363-99 G co CCGG 110.580 -999.990 ... V4 2014 07 16 15 36 00 47.8011 11.0245 941.00 936.00 5.00 370334 HPB 2014 06 10 11 55 00 5322-99 G co CCGG 109.850 -999.990 ... V4 2014 07 16 15 20 00 47.8011 11.0245 941.00 936.00 5.00 370335 HPB 2014 06 16 11 55 00 1569-99 G co CCGG 113.840 -999.990 ... V4 2014 07 16 16 08 00 47.8011 11.0245 941.00 936.00 5.00 370336 HPB 2014 06 16 11 55 00 4430-99 G co CCGG 114.500 -999.990 ... V4 2014 07 16 15 52 00 47.8011 11.0245 941.00 936.00 5.00 370337 HPB 2014 06 26 11 00 00 3512-99 G co CCGG 104.160 -999.990 ... V4 2014 07 24 16 45 00 47.8011 11.0245 941.00 936.00 5.00 371148 HPB 2014 06 30 11 55 00 4575-99 G co CCGG 101.470 -999.990 ... V4 2014 07 24 17 01 00 47.8011 11.0245 941.00 936.00 5.00 371147 HPB 2014 07 07 11 55 00 1487-99 G co CCGG 106.310 -999.990 ... V4 2014 08 06 12 27 00 47.8011 11.0245 941.00 936.00 5.00 371503 HPB 2014 07 07 11 55 00 4496-99 G co CCGG 106.600 -999.990 ... V4 2014 08 06 12 43 00 47.8011 11.0245 941.00 936.00 5.00 371504 HPB 2014 07 14 11 55 00 2431-99 G co CCGG 111.010 -999.990 ... V4 2014 08 06 12 59 00 47.8011 11.0245 941.00 936.00 5.00 371499 HPB 2014 07 14 11 55 00 6129-66 G co CCGG 110.740 -999.990 ... V4 2014 08 06 13 15 00 47.8011 11.0245 941.00 936.00 5.00 371500 HPB 2014 07 21 11 53 00 2333-99 G co CCGG 110.950 -999.990 ... V4 2014 09 05 15 23 00 47.8011 11.0245 941.00 936.00 5.00 373441 HPB 2014 07 21 11 53 00 707-99 G co CCGG 110.460 -999.990 ... V4 2014 09 05 15 07 00 47.8011 11.0245 941.00 936.00 5.00 373440 HPB 2014 07 28 12 00 00 4865-99 G co CCGG 136.800 -999.990 ... V4 2014 09 05 14 35 00 47.8011 11.0245 941.00 936.00 5.00 373442 HPB 2014 07 28 12 00 00 6072-66 G co CCGG 139.060 -999.990 ... V4 2014 09 05 14 51 00 47.8011 11.0245 941.00 936.00 5.00 373443 HPB 2014 08 04 11 55 00 4096-99 G co CCGG 118.130 -999.990 ... V4 2014 08 29 13 54 00 47.8011 11.0245 941.00 936.00 5.00 373151 HPB 2014 08 04 11 55 00 4285-99 G co CCGG 118.960 -999.990 ... V4 2014 08 29 14 10 00 47.8011 11.0245 941.00 936.00 5.00 373150 HPB 2014 08 11 11 55 00 1499-99 G co CCGG 118.250 -999.990 ... V4 2014 09 08 15 05 00 47.8011 11.0245 941.00 936.00 5.00 373400 HPB 2014 08 11 11 55 00 3545-99 G co CCGG 118.330 -999.990 ... V4 2014 09 08 15 21 00 47.8011 11.0245 941.00 936.00 5.00 373401 HPB 2014 08 19 12 02 00 4756-99 G co CCGG 135.570 -999.990 ... V4 2014 10 01 14 52 00 47.8011 11.0245 941.00 936.00 5.00 374748 HPB 2014 08 19 12 02 00 5375-99 G co CCGG 134.700 -999.990 ... V4 2014 10 01 15 08 00 47.8011 11.0245 941.00 936.00 5.00 374749 HPB 2014 08 25 11 55 00 2271-99 G co CCGG 133.090 -999.990 ... V4 2014 10 01 15 24 00 47.8011 11.0245 941.00 936.00 5.00 374746 HPB 2014 08 25 11 55 00 2857-99 G co CCGG 133.900 -999.990 ... V4 2014 10 01 15 40 00 47.8011 11.0245 941.00 936.00 5.00 374747 HPB 2014 09 01 11 55 00 206-99 G co CCGG 139.220 -999.990 ... V4 2014 10 01 15 56 00 47.8011 11.0245 941.00 936.00 5.00 374753 HPB 2014 09 01 11 55 00 6638-66 G co CCGG 137.420 -999.990 ... V4 2014 10 01 16 12 00 47.8011 11.0245 941.00 936.00 5.00 374752 HPB 2014 09 08 12 04 00 5070-99 G co CCGG 143.310 -999.990 ... V4 2014 10 01 16 28 00 47.8011 11.0245 941.00 936.00 5.00 374750 HPB 2014 09 08 12 04 00 5180-99 G co CCGG 142.930 -999.990 ... V4 2014 10 01 16 44 00 47.8011 11.0245 941.00 936.00 5.00 374751 HPB 2014 09 15 12 10 00 1945-99 G co CCGG 148.020 -999.990 ... V4 2014 10 16 10 52 00 47.8011 11.0245 941.00 936.00 5.00 375567 HPB 2014 09 15 12 10 00 4980-99 G co CCGG 148.760 -999.990 ... V4 2014 10 16 11 08 00 47.8011 11.0245 941.00 936.00 5.00 375568 HPB 2014 09 22 11 55 00 3096-99 G co CCGG 123.950 -999.990 ... V4 2014 10 16 11 24 00 47.8011 11.0245 941.00 936.00 5.00 375569 HPB 2014 09 22 11 55 00 4222-99 G co CCGG 123.460 -999.990 ... V4 2014 10 16 11 40 00 47.8011 11.0245 941.00 936.00 5.00 375570 HPB 2014 09 29 11 55 00 137-99 G co CCGG 127.820 -999.990 ... V4 2014 11 13 16 21 00 47.8011 11.0245 941.00 936.00 5.00 376994 HPB 2014 09 29 11 55 00 4056-99 G co CCGG 127.980 -999.990 ... V4 2014 11 13 16 37 00 47.8011 11.0245 941.00 936.00 5.00 376995 HPB 2014 10 06 11 55 00 1496-99 G co CCGG 145.260 -999.990 ... V4 2014 11 13 15 49 00 47.8011 11.0245 941.00 936.00 5.00 376992 HPB 2014 10 06 11 55 00 4525-99 G co CCGG 145.660 -999.990 ... V4 2014 11 13 16 05 00 47.8011 11.0245 941.00 936.00 5.00 376993 HPB 2014 10 15 11 55 00 3757-99 G co CCGG 109.620 -999.990 ... V4 2014 11 24 17 05 00 47.8011 11.0245 941.00 936.00 5.00 377356 HPB 2014 10 15 11 55 00 5084-99 G co CCGG 107.800 -999.990 ... V4 2014 11 24 17 21 00 47.8011 11.0245 941.00 936.00 5.00 377357 HPB 2014 10 20 11 55 00 1306-99 G co CCGG 105.570 -999.990 ... V4 2014 11 24 16 49 00 47.8011 11.0245 941.00 936.00 5.00 377355 HPB 2014 10 20 11 55 00 468-99 G co CCGG 105.270 -999.990 ... V4 2014 11 24 16 33 00 47.8011 11.0245 941.00 936.00 5.00 377354 HPB 2014 10 27 11 55 00 238-99 G co CCGG 131.580 -999.990 ... V4 2014 12 10 12 42 00 47.8011 11.0245 941.00 936.00 5.00 378346 HPB 2014 10 27 11 55 00 4547-99 G co CCGG 131.600 -999.990 ... V4 2014 12 10 12 58 00 47.8011 11.0245 941.00 936.00 5.00 378347 HPB 2014 11 03 11 55 00 2402-99 G co CCGG 100.330 -999.990 ... V4 2014 12 10 12 10 00 47.8011 11.0245 941.00 936.00 5.00 378344 HPB 2014 11 03 11 55 00 3052-99 G co CCGG 100.350 -999.990 ... V4 2014 12 10 12 26 00 47.8011 11.0245 941.00 936.00 5.00 378345 HPB 2014 11 10 11 55 00 1592-99 G co CCGG 161.420 -999.990 ... V4 2014 12 17 08 41 00 47.8011 11.0245 941.00 936.00 5.00 378488 HPB 2014 11 10 11 55 00 4409-99 G co CCGG 161.170 -999.990 ... V4 2014 12 17 08 57 00 47.8011 11.0245 941.00 936.00 5.00 378489 HPB 2014 11 17 11 55 00 3030-99 G co CCGG 188.660 -999.990 ... V4 2014 12 16 17 08 00 47.8011 11.0245 941.00 936.00 5.00 378486 HPB 2014 11 17 11 55 00 4397-99 G co CCGG 190.420 -999.990 ... V4 2014 12 16 17 24 00 47.8011 11.0245 941.00 936.00 5.00 378487 HPB 2014 11 24 11 57 00 26-99 G co CCGG 159.810 -999.990 ... V4 2015 01 13 15 39 00 47.8011 11.0245 941.00 936.00 5.00 379825 HPB 2014 11 24 11 57 00 3853-99 G co CCGG 160.520 -999.990 ... V4 2015 01 13 15 55 00 47.8011 11.0245 941.00 936.00 5.00 379826 HPB 2014 12 01 11 55 00 1222-99 G co CCGG 346.870 -999.990 .X. V4 2015 01 13 15 07 00 47.8011 11.0245 941.00 936.00 5.00 379823 HPB 2014 12 01 11 55 00 4683-99 G co CCGG 346.430 -999.990 .X. V4 2015 01 13 15 23 00 47.8011 11.0245 941.00 936.00 5.00 379824 HPB 2014 12 08 11 55 00 383-99 G co CCGG 207.720 -999.990 ... V4 2015 02 11 11 37 00 47.8011 11.0245 941.00 936.00 5.00 380808 HPB 2014 12 08 11 55 00 4886-99 G co CCGG 207.280 -999.990 ... V4 2015 02 11 11 53 00 47.8011 11.0245 941.00 936.00 5.00 380809 HPB 2014 12 17 11 55 00 1300-99 G co CCGG 151.710 -999.990 ... V4 2015 02 11 11 05 00 47.8011 11.0245 941.00 936.00 5.00 380810 HPB 2014 12 17 11 55 00 3277-99 G co CCGG 151.550 -999.990 ... V4 2015 02 11 11 21 00 47.8011 11.0245 941.00 936.00 5.00 380811 HPB 2014 12 22 11 55 00 1828-99 G co CCGG 118.890 -999.990 ... V4 2015 02 17 10 19 00 47.8011 11.0245 941.00 936.00 5.00 381199 HPB 2014 12 22 11 55 00 3520-99 G co CCGG 120.760 -999.990 ... V4 2015 02 17 10 35 00 47.8011 11.0245 941.00 936.00 5.00 381200 HPB 2014 12 29 11 55 00 1499-99 G co CCGG 168.710 -999.990 ... V4 2015 02 13 17 00 00 47.8011 11.0245 941.00 936.00 5.00 381197 HPB 2014 12 29 11 55 00 4308-99 G co CCGG 170.570 -999.990 ... V4 2015 02 13 17 16 00 47.8011 11.0245 941.00 936.00 5.00 381198 HPB 2015 01 05 11 55 00 3347-99 G co CCGG 156.450 -999.990 ... V4 2015 03 17 14 29 00 47.8011 11.0245 941.00 936.00 5.00 382466 HPB 2015 01 05 11 55 00 4160-99 G co CCGG 156.310 -999.990 ... V4 2015 03 17 14 45 00 47.8011 11.0245 941.00 936.00 5.00 382467 HPB 2015 01 13 11 55 00 3600-99 G co CCGG 157.870 -999.990 ... V4 2015 03 16 13 07 00 47.8011 11.0245 941.00 936.00 5.00 382465 HPB 2015 01 13 11 55 00 4376-99 G co CCGG 156.800 -999.990 ... V4 2015 03 16 12 51 00 47.8011 11.0245 941.00 936.00 5.00 382464 HPB 2015 01 19 11 58 00 2915-99 G co CCGG 143.370 -999.990 ... V4 2015 03 06 13 27 00 47.8011 11.0245 941.00 936.00 5.00 382087 HPB 2015 01 19 11 58 00 4511-99 G co CCGG 142.620 -999.990 ... V4 2015 03 06 13 43 00 47.8011 11.0245 941.00 936.00 5.00 382088 HPB 2015 01 26 11 55 00 2326-99 G co CCGG 170.360 -999.990 ... V4 2015 03 06 16 06 00 47.8011 11.0245 941.00 936.00 5.00 382071 HPB 2015 01 26 11 55 00 4556-99 G co CCGG 167.610 -999.990 ... V4 2015 03 06 16 22 00 47.8011 11.0245 941.00 936.00 5.00 382072 HPB 2015 02 02 11 55 00 173-99 G co CCGG 174.450 -999.990 ... V4 2015 03 27 17 13 00 47.8011 11.0245 941.00 936.00 5.00 383874 HPB 2015 02 02 11 55 00 3346-99 G co CCGG 175.140 -999.990 ... V4 2015 03 27 17 29 00 47.8011 11.0245 941.00 936.00 5.00 383875 HPB 2015 02 09 11 55 00 360-99 G co CCGG 147.260 -999.990 ... V4 2015 03 30 10 49 00 47.8011 11.0245 941.00 936.00 5.00 383876 HPB 2015 02 09 11 55 00 4796-99 G co CCGG 145.040 -999.990 ... V4 2015 03 30 11 05 00 47.8011 11.0245 941.00 936.00 5.00 383877 HPB 2015 02 17 11 55 00 1498-99 G co CCGG 250.850 -999.990 .X. V4 2015 03 27 16 26 00 47.8011 11.0245 941.00 936.00 5.00 383871 HPB 2015 02 17 11 55 00 5137-99 G co CCGG 246.390 -999.990 .X. V4 2015 03 27 16 10 00 47.8011 11.0245 941.00 936.00 5.00 383870 HPB 2015 02 23 11 55 00 2907-99 G co CCGG 165.880 -999.990 ... V4 2015 03 27 16 42 00 47.8011 11.0245 941.00 936.00 5.00 383872 HPB 2015 02 23 11 55 00 3806-99 G co CCGG 165.870 -999.990 ... V4 2015 03 27 16 58 00 47.8011 11.0245 941.00 936.00 5.00 383873 HPB 2015 03 02 11 55 00 1548-99 G co CCGG 138.780 -999.990 ... V4 2015 04 10 11 37 00 47.8011 11.0245 941.00 936.00 5.00 384187 HPB 2015 03 02 11 55 00 6765-66 G co CCGG 138.830 -999.990 ... V4 2015 04 10 11 53 00 47.8011 11.0245 941.00 936.00 5.00 384188 HPB 2015 03 09 11 55 00 4849-99 G co CCGG 179.140 -999.990 ... V4 2015 04 10 12 25 00 47.8011 11.0245 941.00 936.00 5.00 384190 HPB 2015 03 09 11 55 00 821-99 G co CCGG 180.790 -999.990 ... V4 2015 04 10 12 09 00 47.8011 11.0245 941.00 936.00 5.00 384189 HPB 2015 03 16 11 55 00 1758-99 G co CCGG 207.950 -999.990 N.. V4 2015 04 22 14 03 00 47.8011 11.0245 941.00 936.00 5.00 385087 HPB 2015 03 16 11 55 00 3653-99 G co CCGG 196.880 -999.990 N.. V4 2015 04 22 14 19 00 47.8011 11.0245 941.00 936.00 5.00 385088 HPB 2015 03 24 11 55 00 1725-99 G co CCGG 175.330 -999.990 ... V4 2015 04 22 13 47 00 47.8011 11.0245 941.00 936.00 5.00 385085 HPB 2015 03 24 11 55 00 993-99 G co CCGG 174.560 -999.990 ... V4 2015 04 22 13 31 00 47.8011 11.0245 941.00 936.00 5.00 385086 HPB 2015 04 01 11 55 00 3995-99 G co CCGG 151.830 -999.990 ... V4 2015 05 08 12 43 00 47.8011 11.0245 941.00 936.00 5.00 386079 HPB 2015 04 01 11 55 00 5345-99 G co CCGG 150.580 -999.990 ... V4 2015 05 08 12 59 00 47.8011 11.0245 941.00 936.00 5.00 386080 HPB 2015 04 07 11 55 00 5136-99 G co CCGG 175.010 -999.990 ... V4 2015 05 08 14 04 00 47.8011 11.0245 941.00 936.00 5.00 386082 HPB 2015 04 07 11 55 00 541-99 G co CCGG 175.400 -999.990 ... V4 2015 05 08 13 48 00 47.8011 11.0245 941.00 936.00 5.00 386081 HPB 2015 04 13 11 55 00 3023-99 G co CCGG 143.640 -999.990 ... V4 2015 05 28 08 50 00 47.8011 11.0245 941.00 936.00 5.00 386544 HPB 2015 04 13 11 55 00 785-99 G co CCGG 144.440 -999.990 ... V4 2015 05 28 08 34 00 47.8011 11.0245 941.00 936.00 5.00 386543 HPB 2015 04 20 12 02 00 1186-99 G co CCGG 150.330 -999.990 ... V4 2015 05 28 09 06 00 47.8011 11.0245 941.00 936.00 5.00 386541 HPB 2015 04 20 12 02 00 2472-99 G co CCGG 151.810 -999.990 ... V4 2015 05 28 09 22 00 47.8011 11.0245 941.00 936.00 5.00 386542 HPB 2015 04 27 11 55 00 1537-99 G co CCGG 132.800 -999.990 ... V4 2015 06 12 11 46 00 47.8011 11.0245 941.00 936.00 5.00 387412 HPB 2015 04 27 11 55 00 4147-99 G co CCGG 133.360 -999.990 ... V4 2015 06 12 12 02 00 47.8011 11.0245 941.00 936.00 5.00 387413 HPB 2015 05 04 11 55 00 1219-99 G co CCGG 118.980 -999.990 ... V4 2015 06 12 12 18 00 47.8011 11.0245 941.00 936.00 5.00 387414 HPB 2015 05 04 11 55 00 4253-99 G co CCGG 117.890 -999.990 ... V4 2015 06 12 12 33 00 47.8011 11.0245 941.00 936.00 5.00 387415 HPB 2015 05 11 11 55 00 1774-99 G co CCGG 135.210 -999.990 ... V4 2015 06 19 14 16 00 47.8011 11.0245 941.00 936.00 5.00 388021 HPB 2015 05 11 11 55 00 2778-99 G co CCGG 134.240 -999.990 ... V4 2015 06 19 14 32 00 47.8011 11.0245 941.00 936.00 5.00 388022 HPB 2015 05 18 11 55 00 4292-99 G co CCGG 143.020 -999.990 ... V4 2015 06 19 13 45 00 47.8011 11.0245 941.00 936.00 5.00 388023 HPB 2015 05 18 11 55 00 4795-99 G co CCGG 142.630 -999.990 ... V4 2015 06 19 14 01 00 47.8011 11.0245 941.00 936.00 5.00 388024 HPB 2015 05 26 11 55 00 3326-99 G co CCGG 160.100 -999.990 ... V4 2015 07 13 15 39 00 47.8011 11.0245 941.00 936.00 5.00 389082 HPB 2015 05 26 11 55 00 3992-99 G co CCGG 159.290 -999.990 ... V4 2015 07 13 15 55 00 47.8011 11.0245 941.00 936.00 5.00 389083 HPB 2015 06 02 11 55 00 4875-99 G co CCGG 117.440 -999.990 ... V4 2015 07 20 15 45 00 47.8011 11.0245 941.00 936.00 5.00 389488 HPB 2015 06 02 11 55 00 5335-99 G co CCGG 116.910 -999.990 ... V4 2015 07 20 16 01 00 47.8011 11.0245 941.00 936.00 5.00 389489 HPB 2015 06 08 11 57 00 4078-99 G co CCGG 106.340 -999.990 ... V4 2015 07 22 17 08 00 47.8011 11.0245 941.00 936.00 5.00 389978 HPB 2015 06 08 11 57 00 6280-66 G co CCGG 106.480 -999.990 ... V4 2015 07 22 17 24 00 47.8011 11.0245 941.00 936.00 5.00 389979 HPB 2015 06 15 11 55 00 3455-99 G co CCGG 117.660 -999.990 ... V4 2015 07 23 09 20 00 47.8011 11.0245 941.00 936.00 5.00 389976 HPB 2015 06 15 11 55 00 3728-99 G co CCGG 117.010 -999.990 ... V4 2015 07 23 09 35 00 47.8011 11.0245 941.00 936.00 5.00 389977 HPB 2015 06 22 11 55 00 1648-99 G co CCGG 107.510 -999.990 ... V4 2015 08 06 13 53 00 47.8011 11.0245 941.00 936.00 5.00 390510 HPB 2015 06 22 11 55 00 3352-99 G co CCGG 107.320 -999.990 ... V4 2015 08 06 14 09 00 47.8011 11.0245 941.00 936.00 5.00 390511 HPB 2015 06 29 11 55 00 4886-99 G co CCGG 119.920 -999.990 ... V4 2015 08 06 13 22 00 47.8011 11.0245 941.00 936.00 5.00 390508 HPB 2015 06 29 11 55 00 5262-99 G co CCGG 119.010 -999.990 ... V4 2015 08 06 13 37 00 47.8011 11.0245 941.00 936.00 5.00 390509 HPB 2015 07 06 11 55 00 4509-99 G co CCGG 172.130 -999.990 ... V4 2015 08 20 13 23 00 47.8011 11.0245 941.00 936.00 5.00 391617 HPB 2015 07 06 11 55 00 648-99 G co CCGG 172.410 -999.990 ... V4 2015 08 20 13 07 00 47.8011 11.0245 941.00 936.00 5.00 391618 HPB 2015 07 13 11 55 00 4636-99 G co CCGG 119.600 -999.990 ... V4 2015 08 20 13 39 00 47.8011 11.0245 941.00 936.00 5.00 391616 HPB 2015 07 13 11 55 00 6765-66 G co CCGG 121.050 -999.990 ... V4 2015 08 20 13 55 00 47.8011 11.0245 941.00 936.00 5.00 391615 HPB 2015 07 20 11 55 00 1564-99 G co CCGG 129.040 -999.990 ... V4 2015 09 08 10 39 00 47.8011 11.0245 941.00 936.00 5.00 392777 HPB 2015 07 20 11 55 00 1762-99 G co CCGG 128.520 -999.990 ... V4 2015 09 08 10 23 00 47.8011 11.0245 941.00 936.00 5.00 392776 HPB 2015 07 27 11 55 00 4250-99 G co CCGG 117.010 -999.990 ... V4 2015 09 04 13 17 00 47.8011 11.0245 941.00 936.00 5.00 392778 HPB 2015 07 27 11 55 00 4403-99 G co CCGG 117.430 -999.990 ... V4 2015 09 04 13 32 00 47.8011 11.0245 941.00 936.00 5.00 392779 HPB 2015 08 03 11 55 00 1088-99 G co CCGG 115.830 -999.990 ... V4 2015 09 15 10 56 00 47.8011 11.0245 941.00 936.00 5.00 393503 HPB 2015 08 03 11 55 00 4410-99 G co CCGG 114.540 -999.990 ... V4 2015 09 15 10 41 00 47.8011 11.0245 941.00 936.00 5.00 393502 HPB 2015 08 10 11 55 00 3523-99 G co CCGG 127.850 -999.990 ... V4 2015 09 15 11 28 00 47.8011 11.0245 941.00 936.00 5.00 393504 HPB 2015 08 10 11 55 00 731-99 G co CCGG 128.260 -999.990 ... V4 2015 09 15 11 12 00 47.8011 11.0245 941.00 936.00 5.00 393505 HPB 2015 08 17 11 55 00 2782-99 G co CCGG 125.770 -999.990 ... V4 2015 09 22 14 03 00 47.8011 11.0245 941.00 936.00 5.00 393930 HPB 2015 08 17 11 55 00 450-99 G co CCGG 125.060 -999.990 ... V4 2015 09 22 13 47 00 47.8011 11.0245 941.00 936.00 5.00 393929 HPB 2015 08 24 11 55 00 2030-99 G co CCGG 134.280 -999.990 ... V4 2015 09 22 14 34 00 47.8011 11.0245 941.00 936.00 5.00 393931 HPB 2015 08 24 11 55 00 2495-99 G co CCGG 133.510 -999.990 ... V4 2015 09 22 14 19 00 47.8011 11.0245 941.00 936.00 5.00 393932 HPB 2015 08 31 11 55 00 2962-99 G co CCGG 130.020 -999.990 ... V4 2015 10 01 14 26 00 47.8011 11.0245 941.00 936.00 5.00 394662 HPB 2015 08 31 11 55 00 3492-99 G co CCGG 130.140 -999.990 ... V4 2015 10 01 14 42 00 47.8011 11.0245 941.00 936.00 5.00 394663 HPB 2015 09 07 11 55 00 3513-99 G co CCGG 116.000 -999.990 ... V4 2015 10 01 14 58 00 47.8011 11.0245 941.00 936.00 5.00 394664 HPB 2015 09 07 11 55 00 4596-99 G co CCGG 116.370 -999.990 ... V4 2015 10 01 15 14 00 47.8011 11.0245 941.00 936.00 5.00 394665 HPB 2015 09 14 11 55 00 1282-99 G co CCGG 117.360 -999.990 ... V4 2015 10 21 11 18 00 47.8011 11.0245 941.00 936.00 5.00 395589 HPB 2015 09 14 11 55 00 3214-99 G co CCGG 117.190 -999.990 ... V4 2015 10 21 11 02 00 47.8011 11.0245 941.00 936.00 5.00 395590 HPB 2015 09 21 11 55 00 2492-99 G co CCGG 136.110 -999.990 ... V4 2015 10 21 11 43 00 47.8011 11.0245 941.00 936.00 5.00 395587 HPB 2015 09 21 11 55 00 4517-99 G co CCGG 135.270 -999.990 ... V4 2015 10 21 11 59 00 47.8011 11.0245 941.00 936.00 5.00 395588 HPB 2015 09 28 11 55 00 222-99 G co CCGG 121.330 -999.990 ... V4 2015 10 30 14 32 00 47.8011 11.0245 941.00 936.00 5.00 396597 HPB 2015 09 28 11 55 00 5101-99 G co CCGG 121.890 -999.990 ... V4 2015 10 30 14 47 00 47.8011 11.0245 941.00 936.00 5.00 396598 HPB 2015 10 05 11 55 00 2429-99 G co CCGG 134.800 -999.990 ... V4 2015 10 30 15 19 00 47.8011 11.0245 941.00 936.00 5.00 396599 HPB 2015 10 05 11 55 00 5197-99 G co CCGG 136.490 -999.990 ... V4 2015 10 30 15 03 00 47.8011 11.0245 941.00 936.00 5.00 396600 HPB 2015 10 13 11 57 00 4080-99 G co CCGG 193.930 -999.990 .X. V4 2015 11 16 16 47 00 47.8011 11.0245 941.00 936.00 5.00 397427 HPB 2015 10 13 11 57 00 922-99 G co CCGG 194.810 -999.990 .X. V4 2015 11 16 16 31 00 47.8011 11.0245 941.00 936.00 5.00 397426 HPB 2015 10 20 11 55 00 1113-99 G co CCGG 232.090 -999.990 .X. V4 2015 11 16 15 59 00 47.8011 11.0245 941.00 936.00 5.00 397428 HPB 2015 10 20 11 55 00 1409-99 G co CCGG 229.760 -999.990 .X. V4 2015 11 16 16 15 00 47.8011 11.0245 941.00 936.00 5.00 397429 HPB 2015 10 28 12 42 00 2399-99 G co CCGG 121.290 -999.990 ... V4 2015 12 01 15 55 00 47.8011 11.0245 941.00 936.00 5.00 398296 HPB 2015 10 28 12 42 00 5409-99 G co CCGG 118.200 -999.990 ... V4 2015 12 01 16 11 00 47.8011 11.0245 941.00 936.00 5.00 398297 HPB 2015 11 04 12 41 00 2627-99 G co CCGG 125.180 -999.990 ... V4 2015 12 01 16 43 00 47.8011 11.0245 941.00 936.00 5.00 398298 HPB 2015 11 04 12 41 00 735-99 G co CCGG 125.440 -999.990 ... V4 2015 12 01 16 27 00 47.8011 11.0245 941.00 936.00 5.00 398299 HPB 2015 11 09 11 55 00 2709-99 G co CCGG 106.200 -999.990 ... V4 2015 12 16 16 12 00 47.8011 11.0245 941.00 936.00 5.00 398909 HPB 2015 11 09 11 55 00 5105-99 G co CCGG 105.520 -999.990 ... V4 2015 12 16 16 28 00 47.8011 11.0245 941.00 936.00 5.00 398910 HPB 2015 11 16 11 55 00 2601-99 G co CCGG 86.910 -999.990 ... V4 2015 12 16 15 56 00 47.8011 11.0245 941.00 936.00 5.00 398908 HPB 2015 11 16 11 55 00 668-99 G co CCGG 86.020 -999.990 ... V4 2015 12 16 15 40 00 47.8011 11.0245 941.00 936.00 5.00 398907 HPB 2015 11 23 11 55 00 1410-99 G co CCGG 146.690 -999.990 ... V4 2016 01 15 11 41 00 47.8011 11.0245 941.00 936.00 5.00 400099 HPB 2015 11 23 11 55 00 5102-99 G co CCGG 147.890 -999.990 ... V4 2016 01 15 11 25 00 47.8011 11.0245 941.00 936.00 5.00 400100 HPB 2015 12 01 11 55 00 1933-99 G co CCGG 118.430 -999.990 ... V4 2016 01 15 10 53 00 47.8011 11.0245 941.00 936.00 5.00 400097 HPB 2015 12 01 11 55 00 4808-99 G co CCGG 119.000 -999.990 ... V4 2016 01 15 11 09 00 47.8011 11.0245 941.00 936.00 5.00 400098 HPB 2015 12 07 11 55 00 3178-99 G co CCGG 130.250 -999.990 ... V4 2016 01 19 16 56 00 47.8011 11.0245 941.00 936.00 5.00 400346 HPB 2015 12 07 11 55 00 4542-99 G co CCGG 127.800 -999.990 ... V4 2016 01 19 17 11 00 47.8011 11.0245 941.00 936.00 5.00 400347 HPB 2015 12 14 11 55 00 3207-99 G co CCGG 160.160 -999.990 ... V4 2016 01 20 09 32 00 47.8011 11.0245 941.00 936.00 5.00 400344 HPB 2015 12 14 11 55 00 3662-99 G co CCGG 160.350 -999.990 ... V4 2016 01 20 09 48 00 47.8011 11.0245 941.00 936.00 5.00 400345 HPB 2015 12 22 11 55 00 4104-99 G co CCGG 131.020 -999.990 ... V4 2016 01 26 16 52 00 47.8011 11.0245 941.00 936.00 5.00 400892 HPB 2015 12 22 11 55 00 4968-99 G co CCGG 131.560 -999.990 ... V4 2016 01 26 17 07 00 47.8011 11.0245 941.00 936.00 5.00 400893 HPB 2015 12 29 11 55 00 1218-99 G co CCGG 151.060 -999.990 ... V4 2016 01 26 17 23 00 47.8011 11.0245 941.00 936.00 5.00 400894 HPB 2015 12 29 11 55 00 1727-99 G co CCGG 150.520 -999.990 ... V4 2016 01 26 17 39 00 47.8011 11.0245 941.00 936.00 5.00 400895 HPB 2016 01 04 11 55 00 3506-99 G co CCGG 144.010 -999.990 ... V4 2016 02 09 13 29 00 47.8011 11.0245 941.00 936.00 5.00 401404 HPB 2016 01 04 11 55 00 4826-99 G co CCGG 144.100 -999.990 ... V4 2016 02 09 13 45 00 47.8011 11.0245 941.00 936.00 5.00 401405 HPB 2016 01 11 11 55 00 1449-99 G co CCGG 143.780 -999.990 ... V4 2016 02 09 14 01 00 47.8011 11.0245 941.00 936.00 5.00 401402 HPB 2016 01 11 11 55 00 2435-99 G co CCGG 143.670 -999.990 ... V4 2016 02 09 14 17 00 47.8011 11.0245 941.00 936.00 5.00 401403 HPB 2016 01 18 11 55 00 2831-99 G co CCGG 191.960 -999.990 ... V4 2016 03 02 13 41 00 47.8011 11.0245 941.00 936.00 5.00 402772 HPB 2016 01 18 11 55 00 5306-99 G co CCGG 191.950 -999.990 ... V4 2016 03 02 13 57 00 47.8011 11.0245 941.00 936.00 5.00 402773 HPB 2016 01 26 13 43 00 14-99 G co CCGG 132.600 -999.990 ... V4 2016 03 02 14 13 00 47.8011 11.0245 941.00 936.00 5.00 402774 HPB 2016 01 26 13 43 00 2399-99 G co CCGG 132.770 -999.990 ... V4 2016 03 02 14 29 00 47.8011 11.0245 941.00 936.00 5.00 402775 HPB 2016 02 01 11 55 00 1657-99 G co CCGG 126.650 -999.990 ... V4 2016 03 01 10 32 00 47.8011 11.0245 941.00 936.00 5.00 402817 HPB 2016 02 01 11 55 00 2687-99 G co CCGG 126.350 -999.990 ... V4 2016 03 01 10 48 00 47.8011 11.0245 941.00 936.00 5.00 402818 HPB 2016 02 08 11 55 00 109-99 G co CCGG 156.350 -999.990 ... V4 2016 03 01 11 03 00 47.8011 11.0245 941.00 936.00 5.00 402819 HPB 2016 02 08 11 55 00 3353-99 G co CCGG 148.960 -999.990 A.. V4 2016 03 01 11 19 00 47.8011 11.0245 941.00 936.00 5.00 402820 HPB 2016 02 15 11 55 00 1238-99 G co CCGG 163.690 -999.990 ... V4 2016 03 14 11 37 00 47.8011 11.0245 941.00 936.00 5.00 403507 HPB 2016 02 15 11 55 00 1280-99 G co CCGG 163.430 -999.990 ... V4 2016 03 14 11 53 00 47.8011 11.0245 941.00 936.00 5.00 403508 HPB 2016 02 22 11 56 00 1307-99 G co CCGG 129.960 -999.990 ... V4 2016 03 14 12 09 00 47.8011 11.0245 941.00 936.00 5.00 403505 HPB 2016 02 22 11 56 00 1474-99 G co CCGG 130.160 -999.990 ... V4 2016 03 14 12 25 00 47.8011 11.0245 941.00 936.00 5.00 403506 HPB 2016 02 29 11 55 00 2794-99 G co CCGG 354.940 -999.990 .X. V4 2016 03 29 11 06 00 47.8011 11.0245 941.00 936.00 5.00 404202 HPB 2016 02 29 11 55 00 4552-99 G co CCGG 357.120 -999.990 .X. V4 2016 03 29 11 21 00 47.8011 11.0245 941.00 936.00 5.00 404203 HPB 2016 03 08 11 56 00 268-99 G co CCGG 197.400 -999.990 ... V4 2016 03 29 11 37 00 47.8011 11.0245 941.00 936.00 5.00 404200 HPB 2016 03 08 11 56 00 4075-99 G co CCGG 197.060 -999.990 ... V4 2016 03 29 11 53 00 47.8011 11.0245 941.00 936.00 5.00 404201 HPB 2016 03 14 11 55 00 1186-99 G co CCGG 210.550 -999.990 ... V4 2016 04 15 11 02 00 47.8011 11.0245 941.00 936.00 5.00 405071 HPB 2016 03 14 11 55 00 2157-99 G co CCGG 212.660 -999.990 ... V4 2016 04 15 11 18 00 47.8011 11.0245 941.00 936.00 5.00 405072 HPB 2016 03 22 11 55 00 1082-99 G co CCGG 163.910 -999.990 ... V4 2016 04 15 10 31 00 47.8011 11.0245 941.00 936.00 5.00 405069 HPB 2016 03 22 11 55 00 3003-99 G co CCGG 161.720 -999.990 ... V4 2016 04 15 10 46 00 47.8011 11.0245 941.00 936.00 5.00 405070 HPB 2016 03 28 11 55 00 4613-99 G co CCGG 149.910 -999.990 ... V4 2016 04 25 15 29 00 47.8011 11.0245 941.00 936.00 5.00 405812 HPB 2016 03 28 11 55 00 849-99 G co CCGG 151.070 -999.990 ... V4 2016 04 25 15 14 00 47.8011 11.0245 941.00 936.00 5.00 405811 HPB 2016 04 04 11 55 00 2296-99 G co CCGG 184.420 -999.990 ... V4 2016 04 25 14 10 00 47.8011 11.0245 941.00 936.00 5.00 405809 HPB 2016 04 04 11 55 00 5005-99 G co CCGG 185.710 -999.990 ... V4 2016 04 25 14 26 00 47.8011 11.0245 941.00 936.00 5.00 405810 HPB 2016 04 11 11 55 00 3718-99 G co CCGG 175.730 -999.990 ... V4 2016 05 05 15 34 00 47.8011 11.0245 941.00 936.00 5.00 406465 HPB 2016 04 11 11 55 00 832-99 G co CCGG 175.280 -999.990 ... V4 2016 05 05 15 19 00 47.8011 11.0245 941.00 936.00 5.00 406464 HPB 2016 04 18 11 55 00 3534-99 G co CCGG 167.100 -999.990 ... V4 2016 05 05 14 47 00 47.8011 11.0245 941.00 936.00 5.00 406466 HPB 2016 04 18 11 55 00 4632-99 G co CCGG 168.100 -999.990 ... V4 2016 05 05 15 03 00 47.8011 11.0245 941.00 936.00 5.00 406467 HPB 2016 04 25 11 55 00 1280-99 G co CCGG 141.780 -999.990 ... V4 2016 05 27 13 50 00 47.8011 11.0245 941.00 936.00 5.00 407397 HPB 2016 04 25 11 55 00 4199-99 G co CCGG 140.460 -999.990 ... V4 2016 05 27 14 06 00 47.8011 11.0245 941.00 936.00 5.00 407398 HPB 2016 05 02 11 56 00 1475-99 G co CCGG 188.310 -999.990 ... V4 2016 05 27 14 22 00 47.8011 11.0245 941.00 936.00 5.00 407399 HPB 2016 05 02 11 56 00 4611-99 G co CCGG 189.380 -999.990 ... V4 2016 05 27 14 38 00 47.8011 11.0245 941.00 936.00 5.00 407400 HPB 2016 05 09 11 55 00 1317-99 G co CCGG 150.070 -999.990 ... V4 2016 06 15 16 27 00 47.8011 11.0245 941.00 936.00 5.00 407937 HPB 2016 05 09 11 55 00 2555-99 G co CCGG 150.480 -999.990 ... V4 2016 06 15 16 43 00 47.8011 11.0245 941.00 936.00 5.00 407938 HPB 2016 05 18 11 55 00 1094-99 G co CCGG 132.510 -999.990 ... V4 2016 06 15 15 55 00 47.8011 11.0245 941.00 936.00 5.00 407939 HPB 2016 05 18 11 55 00 3116-99 G co CCGG 134.280 -999.990 ... V4 2016 06 15 16 11 00 47.8011 11.0245 941.00 936.00 5.00 407940 HPB 2016 05 24 11 55 00 1727-99 G co CCGG 136.600 -999.990 ... V4 2016 06 23 08 53 00 47.8011 11.0245 941.00 936.00 5.00 408805 HPB 2016 05 24 11 55 00 202-99 G co CCGG 135.110 -999.990 ... V4 2016 06 23 08 37 00 47.8011 11.0245 941.00 936.00 5.00 408804 HPB 2016 05 30 11 55 00 4104-99 G co CCGG 133.010 -999.990 ... V4 2016 06 23 09 09 00 47.8011 11.0245 941.00 936.00 5.00 408806 HPB 2016 05 30 11 55 00 4968-99 G co CCGG 131.650 -999.990 ... V4 2016 06 23 09 25 00 47.8011 11.0245 941.00 936.00 5.00 408807 HPB 2016 06 06 11 55 00 2420-99 G co CCGG 133.340 -999.990 ... V4 2016 07 08 11 45 00 47.8011 11.0245 941.00 936.00 5.00 409930 HPB 2016 06 06 11 55 00 5309-99 G co CCGG 134.400 -999.990 ... V4 2016 07 08 12 01 00 47.8011 11.0245 941.00 936.00 5.00 409931 HPB 2016 06 13 11 55 00 2767-99 G co CCGG 106.580 -999.990 ... V4 2016 07 12 13 38 00 47.8011 11.0245 941.00 936.00 5.00 409964 HPB 2016 06 13 11 55 00 825-99 G co CCGG 106.890 -999.990 ... V4 2016 07 12 13 22 00 47.8011 11.0245 941.00 936.00 5.00 409963 HPB 2016 06 21 11 55 00 1477-99 G co CCGG 110.310 -999.990 ... V4 2016 08 08 13 41 00 47.8011 11.0245 941.00 936.00 5.00 411690 HPB 2016 06 21 11 55 00 4332-99 G co CCGG 111.660 -999.990 ... V4 2016 08 08 13 57 00 47.8011 11.0245 941.00 936.00 5.00 411691 HPB 2016 06 27 11 55 00 1912-99 G co CCGG 101.740 -999.990 ... V4 2016 08 08 13 09 00 47.8011 11.0245 941.00 936.00 5.00 411692 HPB 2016 06 27 11 55 00 5152-99 G co CCGG 101.490 -999.990 ... V4 2016 08 08 13 25 00 47.8011 11.0245 941.00 936.00 5.00 411693 HPB 2016 07 04 11 55 00 3426-99 G co CCGG 110.300 -999.990 ... V4 2016 08 03 10 11 00 47.8011 11.0245 941.00 936.00 5.00 411387 HPB 2016 07 04 11 55 00 3620-99 G co CCGG 107.850 -999.990 ... V4 2016 08 03 10 26 00 47.8011 11.0245 941.00 936.00 5.00 411388 HPB 2016 07 11 11 55 00 4609-99 G co CCGG 130.230 -999.990 ... V4 2016 08 03 10 42 00 47.8011 11.0245 941.00 936.00 5.00 411385 HPB 2016 07 11 11 55 00 4720-99 G co CCGG 132.040 -999.990 ... V4 2016 08 03 10 58 00 47.8011 11.0245 941.00 936.00 5.00 411386 HPB 2016 07 18 11 55 00 4607-99 G co CCGG 96.340 -999.990 ... V4 2016 08 12 13 45 00 47.8011 11.0245 941.00 936.00 5.00 412017 HPB 2016 07 18 11 55 00 691-99 G co CCGG 97.420 -999.990 ... V4 2016 08 12 13 29 00 47.8011 11.0245 941.00 936.00 5.00 412016 HPB 2016 07 26 12 04 00 1407-99 G co CCGG 146.970 -999.990 ... V4 2016 08 12 14 17 00 47.8011 11.0245 941.00 936.00 5.00 412015 HPB 2016 07 26 12 04 00 5299-99 G co CCGG 146.670 -999.990 ... V4 2016 08 12 14 01 00 47.8011 11.0245 941.00 936.00 5.00 412014 HPB 2016 08 01 11 55 00 1338-99 G co CCGG 108.710 -999.990 ... V4 2016 08 29 14 12 00 47.8011 11.0245 941.00 936.00 5.00 412927 HPB 2016 08 01 11 55 00 4006-99 G co CCGG 109.590 -999.990 ... V4 2016 08 29 14 28 00 47.8011 11.0245 941.00 936.00 5.00 412928 HPB 2016 08 08 11 55 00 4289-99 G co CCGG 126.340 -999.990 ... V4 2016 08 29 13 56 00 47.8011 11.0245 941.00 936.00 5.00 412926 HPB 2016 08 08 11 55 00 881-99 G co CCGG 125.360 -999.990 ... V4 2016 08 29 13 40 00 47.8011 11.0245 941.00 936.00 5.00 412925 HPB 2016 08 16 11 55 00 5693-99 G co CCGG 126.680 -999.990 ... V4 2016 09 22 10 59 00 47.8011 11.0245 941.00 936.00 5.00 413762 HPB 2016 08 16 11 55 00 5694-99 G co CCGG 128.690 -999.990 ... V4 2016 09 22 11 15 00 47.8011 11.0245 941.00 936.00 5.00 413763 HPB 2016 08 22 11 58 00 5695-99 G co CCGG 106.450 -999.990 ... V4 2016 09 22 10 27 00 47.8011 11.0245 941.00 936.00 5.00 413764 HPB 2016 08 22 11 58 00 5696-99 G co CCGG 106.910 -999.990 ... V4 2016 09 22 10 43 00 47.8011 11.0245 941.00 936.00 5.00 413765 HPB 2016 08 29 11 55 00 4944-99 G co CCGG 125.600 -999.990 ... V4 2016 09 29 14 27 00 47.8011 11.0245 941.00 936.00 5.00 414236 HPB 2016 08 29 11 55 00 573-99 G co CCGG 125.170 -999.990 ... V4 2016 09 29 14 11 00 47.8011 11.0245 941.00 936.00 5.00 414235 HPB 2016 09 05 11 55 00 1505-99 G co CCGG 99.110 -999.990 ... V4 2016 09 29 13 40 00 47.8011 11.0245 941.00 936.00 5.00 414233 HPB 2016 09 05 11 55 00 2789-99 G co CCGG 98.230 -999.990 ... V4 2016 09 29 13 56 00 47.8011 11.0245 941.00 936.00 5.00 414234 HPB 2016 09 12 11 55 00 2207-99 G co CCGG 120.530 -999.990 ... V4 2016 10 19 14 03 00 47.8011 11.0245 941.00 936.00 5.00 415210 HPB 2016 09 12 11 55 00 5320-99 G co CCGG 118.840 -999.990 ... V4 2016 10 19 13 47 00 47.8011 11.0245 941.00 936.00 5.00 415211 HPB 2016 09 19 11 55 00 2432-99 G co CCGG 115.070 -999.990 ... V4 2016 10 19 15 54 00 47.8011 11.0245 941.00 936.00 5.00 415212 HPB 2016 09 19 11 55 00 3945-99 G co CCGG 115.490 -999.990 ... V4 2016 10 19 16 10 00 47.8011 11.0245 941.00 936.00 5.00 415213 HPB 2016 09 26 11 55 00 2033-99 G co CCGG 130.750 -999.990 ... V4 2016 11 10 15 39 00 47.8011 11.0245 941.00 936.00 5.00 416403 HPB 2016 09 26 11 55 00 5409-99 G co CCGG 130.890 -999.990 ... V4 2016 11 10 15 55 00 47.8011 11.0245 941.00 936.00 5.00 416404 HPB 2016 10 04 11 55 00 4008-99 G co CCGG 115.040 -999.990 ... V4 2016 11 10 16 10 00 47.8011 11.0245 941.00 936.00 5.00 416401 HPB 2016 10 04 11 55 00 4292-99 G co CCGG 116.400 -999.990 ... V4 2016 11 10 16 26 00 47.8011 11.0245 941.00 936.00 5.00 416402 HPB 2016 10 10 12 03 00 3324-99 G co CCGG 138.070 -999.990 ... V4 2016 11 07 17 16 00 47.8011 11.0245 941.00 936.00 5.00 416362 HPB 2016 10 10 12 03 00 468-99 G co CCGG 136.880 -999.990 ... V4 2016 11 07 17 00 00 47.8011 11.0245 941.00 936.00 5.00 416361 HPB 2016 10 17 11 57 00 2623-99 G co CCGG 128.980 -999.990 ... V4 2016 11 10 13 00 00 47.8011 11.0245 941.00 936.00 5.00 416375 HPB 2016 10 17 11 57 00 3173-99 G co CCGG 127.950 -999.990 ... V4 2016 11 10 13 16 00 47.8011 11.0245 941.00 936.00 5.00 416376 HPB 2016 10 24 11 55 00 4039-99 G co CCGG 114.930 -999.990 ... V4 2016 11 30 12 57 00 47.8011 11.0245 941.00 936.00 5.00 417287 HPB 2016 10 24 11 55 00 5417-99 G co CCGG 115.230 -999.990 ... V4 2016 11 30 13 12 00 47.8011 11.0245 941.00 936.00 5.00 417288 HPB 2016 10 31 11 55 00 1195-99 G co CCGG 157.470 -999.990 ... V4 2016 11 30 13 28 00 47.8011 11.0245 941.00 936.00 5.00 417285 HPB 2016 10 31 11 55 00 1386-99 G co CCGG 158.450 -999.990 ... V4 2016 11 30 13 44 00 47.8011 11.0245 941.00 936.00 5.00 417286 HPB 2016 11 07 11 55 00 1461-99 G co CCGG 147.690 -999.990 ... V4 2016 12 30 09 01 00 47.8011 11.0245 941.00 936.00 5.00 418658 HPB 2016 11 07 11 55 00 1907-99 G co CCGG 146.430 -999.990 ... V4 2016 12 30 09 17 00 47.8011 11.0245 941.00 936.00 5.00 418659 HPB 2016 11 15 11 55 00 3503-99 G co CCGG 157.880 -999.990 N.. V4 2016 12 29 16 17 00 47.8011 11.0245 941.00 936.00 5.00 418657 HPB 2016 11 15 11 55 00 975-99 G co CCGG 152.470 -999.990 N.. V4 2016 12 29 16 01 00 47.8011 11.0245 941.00 936.00 5.00 418656 HPB 2016 11 21 11 55 00 2018-99 G co CCGG 105.820 -999.990 ... V4 2017 01 24 15 40 00 47.8011 11.0245 941.00 936.00 5.00 419489 HPB 2016 11 21 11 55 00 2881-99 G co CCGG 105.900 -999.990 ... V4 2017 01 24 15 56 00 47.8011 11.0245 941.00 936.00 5.00 419490 HPB 2016 11 28 11 55 00 3091-99 G co CCGG 140.610 -999.990 ... V4 2017 01 24 16 12 00 47.8011 11.0245 941.00 936.00 5.00 419492 HPB 2016 11 28 11 55 00 3766-99 G co CCGG 141.080 -999.990 ... V4 2017 01 24 16 27 00 47.8011 11.0245 941.00 936.00 5.00 419491 HPB 2016 12 06 11 55 00 1499-99 G co CCGG 134.300 -999.990 ... V4 2017 01 18 15 38 00 47.8011 11.0245 941.00 936.00 5.00 419241 HPB 2016 12 06 11 55 00 923-99 G co CCGG 135.390 -999.990 ... V4 2017 01 18 15 23 00 47.8011 11.0245 941.00 936.00 5.00 419240 HPB 2016 12 12 11 55 00 1479-99 G co CCGG 144.160 -999.990 ... V4 2017 01 18 14 51 00 47.8011 11.0245 941.00 936.00 5.00 419238 HPB 2016 12 12 11 55 00 4911-99 G co CCGG 144.060 -999.990 ... V4 2017 01 18 15 07 00 47.8011 11.0245 941.00 936.00 5.00 419239 HPB 2016 12 19 11 55 00 1044-99 G co CCGG 261.020 -999.990 .X. V4 2017 02 02 13 33 00 47.8011 11.0245 941.00 936.00 5.00 419785 HPB 2016 12 19 11 55 00 4494-99 G co CCGG 263.190 -999.990 .X. V4 2017 02 02 13 49 00 47.8011 11.0245 941.00 936.00 5.00 419786 HPB 2016 12 27 11 54 00 1810-99 G co CCGG 138.420 -999.990 ... V4 2017 02 02 14 05 00 47.8011 11.0245 941.00 936.00 5.00 419787 HPB 2016 12 27 11 54 00 2336-99 G co CCGG 138.580 -999.990 ... V4 2017 02 02 14 21 00 47.8011 11.0245 941.00 936.00 5.00 419788 HPB 2017 01 02 11 55 00 1958-99 G co CCGG 150.620 -999.990 ... V4 2017 02 07 11 40 00 47.8011 11.0245 941.00 936.00 5.00 420191 HPB 2017 01 02 11 55 00 2529-99 G co CCGG 153.440 -999.990 ... V4 2017 02 07 11 56 00 47.8011 11.0245 941.00 936.00 5.00 420192 HPB 2017 01 09 11 55 00 3777-99 G co CCGG 220.650 -999.990 .X. V4 2017 02 07 11 08 00 47.8011 11.0245 941.00 936.00 5.00 420193 HPB 2017 01 09 11 55 00 3962-99 G co CCGG 219.750 -999.990 .X. V4 2017 02 07 11 24 00 47.8011 11.0245 941.00 936.00 5.00 420194 HPB 2017 01 16 11 55 00 286-99 G co CCGG 160.130 -999.990 ... V4 2017 03 03 15 34 00 47.8011 11.0245 941.00 936.00 5.00 421584 HPB 2017 01 16 11 55 00 572-99 G co CCGG 160.090 -999.990 ... V4 2017 03 03 15 50 00 47.8011 11.0245 941.00 936.00 5.00 421585 HPB 2017 01 24 11 55 00 1771-99 G co CCGG 476.390 -999.990 .X. V4 2017 03 03 16 05 00 47.8011 11.0245 941.00 936.00 5.00 421582 HPB 2017 01 24 11 55 00 2490-99 G co CCGG 477.040 -999.990 .X. V4 2017 03 03 16 21 00 47.8011 11.0245 941.00 936.00 5.00 421583 HPB 2017 01 30 11 55 00 5506-99 G co CCGG 126.660 -999.990 ... V4 2017 03 08 14 04 00 47.8011 11.0245 941.00 936.00 5.00 422046 HPB 2017 01 30 11 55 00 5698-99 G co CCGG 128.760 -999.990 ... V4 2017 03 08 14 20 00 47.8011 11.0245 941.00 936.00 5.00 422047 HPB 2017 02 06 11 55 00 1968-99 G co CCGG 190.460 -999.990 ... V4 2017 03 08 13 48 00 47.8011 11.0245 941.00 936.00 5.00 422044 HPB 2017 02 06 11 55 00 216-99 G co CCGG 191.070 -999.990 ... V4 2017 03 08 13 32 00 47.8011 11.0245 941.00 936.00 5.00 422045 HPB 2017 02 15 11 55 00 3504-99 G co CCGG 151.570 -999.990 ... V4 2017 03 24 15 36 00 47.8011 11.0245 941.00 936.00 5.00 422588 HPB 2017 02 15 11 55 00 4556-99 G co CCGG 152.300 -999.990 ... V4 2017 03 24 15 21 00 47.8011 11.0245 941.00 936.00 5.00 422589 HPB 2017 02 20 11 55 00 1132-99 G co CCGG 172.810 -999.990 ... V4 2017 03 24 14 49 00 47.8011 11.0245 941.00 936.00 5.00 422586 HPB 2017 02 20 11 55 00 5568-99 G co CCGG 172.590 -999.990 ... V4 2017 03 24 15 05 00 47.8011 11.0245 941.00 936.00 5.00 422587 HPB 2017 02 28 11 55 00 259-99 G co CCGG 131.210 -999.990 ... V4 2017 04 07 15 49 00 47.8011 11.0245 941.00 936.00 5.00 423387 HPB 2017 02 28 11 55 00 3659-99 G co CCGG 131.470 -999.990 ... V4 2017 04 07 16 05 00 47.8011 11.0245 941.00 936.00 5.00 423388 HPB 2017 03 06 11 55 00 1916-99 G co CCGG 136.540 -999.990 ... V4 2017 04 07 16 21 00 47.8011 11.0245 941.00 936.00 5.00 423385 HPB 2017 03 06 11 55 00 2995-99 G co CCGG 137.150 -999.990 ... V4 2017 04 07 16 37 00 47.8011 11.0245 941.00 936.00 5.00 423386 HPB 2017 03 14 11 55 00 1206-99 G co CCGG 168.450 -999.990 ... V4 2017 05 02 08 36 00 47.8011 11.0245 941.00 936.00 5.00 424541 HPB 2017 03 14 11 55 00 3935-99 G co CCGG 169.390 -999.990 ... V4 2017 05 02 08 52 00 47.8011 11.0245 941.00 936.00 5.00 424542 HPB 2017 03 20 11 55 00 2340-99 G co CCGG 127.100 -999.990 ... V4 2017 05 02 10 59 00 47.8011 11.0245 941.00 936.00 5.00 424539 HPB 2017 03 20 11 55 00 3268-99 G co CCGG 126.350 -999.990 ... V4 2017 05 02 10 43 00 47.8011 11.0245 941.00 936.00 5.00 424540 HPB 2017 03 27 11 55 00 2546-99 G co CCGG 164.340 -999.990 A.. V4 2017 05 01 13 37 00 47.8011 11.0245 941.00 936.00 5.00 424436 HPB 2017 03 27 11 55 00 3804-99 G co CCGG 159.270 -999.990 ... V4 2017 05 01 13 53 00 47.8011 11.0245 941.00 936.00 5.00 424437 HPB 2017 04 03 11 55 00 1421-99 G co CCGG 163.760 -999.990 A.. V4 2017 05 01 13 05 00 47.8011 11.0245 941.00 936.00 5.00 424434 HPB 2017 04 03 11 55 00 1461-99 G co CCGG 175.750 -999.990 A.. V4 2017 05 01 13 21 00 47.8011 11.0245 941.00 936.00 5.00 424435 HPB 2017 04 10 11 55 00 2124-99 G co CCGG 130.830 -999.990 ... V4 2017 05 15 16 02 00 47.8011 11.0245 941.00 936.00 5.00 425284 HPB 2017 04 10 11 55 00 4877-99 G co CCGG 129.160 -999.990 ... V4 2017 05 15 16 18 00 47.8011 11.0245 941.00 936.00 5.00 425285 HPB 2017 04 18 11 55 00 1553-99 G co CCGG 143.780 -999.990 ... V4 2017 05 15 14 56 00 47.8011 11.0245 941.00 936.00 5.00 425286 HPB 2017 04 18 11 55 00 1899-99 G co CCGG 143.390 -999.990 ... V4 2017 05 15 15 12 00 47.8011 11.0245 941.00 936.00 5.00 425287 HPB 2017 05 02 11 55 00 3470-99 G co CCGG 128.310 -999.990 ... V2 2017 06 05 13 30 00 47.8011 11.0245 941.00 936.00 5.00 426093 HPB 2017 05 02 11 55 00 3535-99 G co CCGG 127.590 -999.990 ... V2 2017 06 05 13 46 00 47.8011 11.0245 941.00 936.00 5.00 426094 HPB 2017 05 08 11 56 00 2359-99 G co CCGG 176.960 -999.990 ... V2 2017 06 05 14 01 00 47.8011 11.0245 941.00 936.00 5.00 426095 HPB 2017 05 08 11 56 00 2475-99 G co CCGG 177.550 -999.990 ... V2 2017 06 05 14 17 00 47.8011 11.0245 941.00 936.00 5.00 426096 HPB 2017 05 16 11 55 00 3295-99 G co CCGG 118.790 -999.990 ... V2 2017 06 14 12 00 00 47.8011 11.0245 941.00 936.00 5.00 426586 HPB 2017 05 16 11 55 00 357-99 G co CCGG 118.690 -999.990 ... V2 2017 06 14 11 44 00 47.8011 11.0245 941.00 936.00 5.00 426585 HPB 2017 05 22 11 55 00 2879-99 G co CCGG 128.510 -999.990 ... V2 2017 06 14 12 16 00 47.8011 11.0245 941.00 936.00 5.00 426587 HPB 2017 05 22 11 55 00 2910-99 G co CCGG 128.340 -999.990 ... V2 2017 06 14 12 32 00 47.8011 11.0245 941.00 936.00 5.00 426588 HPB 2017 05 29 11 55 00 1645-99 G co CCGG 110.220 -999.990 ... V2 2017 07 12 17 17 00 47.8011 11.0245 941.00 936.00 5.00 427460 HPB 2017 05 29 11 55 00 602-99 G co CCGG 112.190 -999.990 ... V2 2017 07 12 17 01 00 47.8011 11.0245 941.00 936.00 5.00 427459 HPB 2017 06 07 11 55 00 3374-99 G co CCGG 98.750 -999.990 ... V2 2017 07 12 16 45 00 47.8011 11.0245 941.00 936.00 5.00 427458 HPB 2017 06 07 11 55 00 572-99 G co CCGG 100.750 -999.990 ... V2 2017 07 12 16 29 00 47.8011 11.0245 941.00 936.00 5.00 427457 HPB 2017 06 12 11 55 00 1297-99 G co CCGG 121.260 -999.990 ... V2 2017 07 19 16 40 00 47.8011 11.0245 941.00 936.00 5.00 427821 HPB 2017 06 12 11 55 00 5615-99 G co CCGG 121.270 -999.990 ... V2 2017 07 19 16 56 00 47.8011 11.0245 941.00 936.00 5.00 427822 HPB 2017 06 20 11 55 00 5364-99 G co CCGG 140.100 -999.990 ... V2 2017 07 20 09 19 00 47.8011 11.0245 941.00 936.00 5.00 427820 HPB 2017 06 20 11 55 00 977-99 G co CCGG 140.340 -999.990 ... V2 2017 07 20 09 03 00 47.8011 11.0245 941.00 936.00 5.00 427819 HPB 2017 06 28 11 55 00 1413-99 G co CCGG 100.820 -999.990 ... V2 2017 08 04 13 58 00 47.8011 11.0245 941.00 936.00 5.00 428762 HPB 2017 06 28 11 55 00 4958-99 G co CCGG 100.890 -999.990 ... V2 2017 08 04 14 14 00 47.8011 11.0245 941.00 936.00 5.00 428763 HPB 2017 07 03 11 55 00 455-99 G co CCGG 93.600 -999.990 ... V2 2017 08 04 14 45 00 47.8011 11.0245 941.00 936.00 5.00 428764 HPB 2017 07 03 11 55 00 681-99 G co CCGG 93.730 -999.990 ... V2 2017 08 04 14 29 00 47.8011 11.0245 941.00 936.00 5.00 428765 HPB 2017 07 10 11 55 00 2764-99 G co CCGG 107.970 -999.990 ... V2 2017 08 17 09 24 00 47.8011 11.0245 941.00 936.00 5.00 429255 HPB 2017 07 10 11 55 00 4449-99 G co CCGG 107.750 -999.990 ... V2 2017 08 17 09 40 00 47.8011 11.0245 941.00 936.00 5.00 429254 HPB 2017 07 17 11 56 00 1282-99 G co CCGG 104.520 -999.990 ... V2 2017 08 17 15 14 00 47.8011 11.0245 941.00 936.00 5.00 429348 HPB 2017 07 17 11 56 00 4576-99 G co CCGG 104.150 -999.990 ... V2 2017 08 17 15 30 00 47.8011 11.0245 941.00 936.00 5.00 429349 HPB 2017 07 24 11 56 00 3738-99 G co CCGG 98.170 -999.990 ... V2 2017 08 24 15 36 00 47.8011 11.0245 941.00 936.00 5.00 429491 HPB 2017 07 24 11 56 00 4652-99 G co CCGG 97.850 -999.990 ... V2 2017 08 24 15 52 00 47.8011 11.0245 941.00 936.00 5.00 429492 HPB 2017 07 31 11 55 00 1776-99 G co CCGG 102.160 -999.990 ... V2 2017 08 29 11 28 00 47.8011 11.0245 941.00 936.00 5.00 429489 HPB 2017 07 31 11 55 00 4605-99 G co CCGG 102.850 -999.990 ... V2 2017 08 29 11 43 00 47.8011 11.0245 941.00 936.00 5.00 429490 HPB 2017 08 07 11 55 00 1966-99 G co CCGG 112.560 -999.990 ... V2 2017 09 19 11 20 00 47.8011 11.0245 941.00 936.00 5.00 430770 HPB 2017 08 07 11 55 00 838-99 G co CCGG 112.810 -999.990 ... V2 2017 09 19 11 04 00 47.8011 11.0245 941.00 936.00 5.00 430769 HPB 2017 08 14 11 56 00 4865-99 G co CCGG 111.180 -999.990 ... V2 2017 09 19 11 36 00 47.8011 11.0245 941.00 936.00 5.00 430767 HPB 2017 08 14 11 56 00 5713-99 G co CCGG 111.780 -999.990 ... V2 2017 09 19 11 52 00 47.8011 11.0245 941.00 936.00 5.00 430768 HPB 2017 08 21 11 55 00 3269-99 G co CCGG 117.870 -999.990 ... V2 2017 09 20 10 25 00 47.8011 11.0245 941.00 936.00 5.00 430806 HPB 2017 08 21 11 55 00 4715-99 G co CCGG 117.800 -999.990 ... V2 2017 09 20 10 41 00 47.8011 11.0245 941.00 936.00 5.00 430807 HPB 2017 08 28 11 55 00 3805-99 G co CCGG 139.380 -999.990 ... V2 2017 09 20 10 08 00 47.8011 11.0245 941.00 936.00 5.00 430808 HPB 2017 08 28 11 55 00 562-99 G co CCGG 137.670 -999.990 ... V2 2017 09 20 09 52 00 47.8011 11.0245 941.00 936.00 5.00 430809 HPB 2017 09 04 11 55 00 4894-99 G co CCGG 132.430 -999.990 ... V2 2017 10 05 15 21 00 47.8011 11.0245 941.00 936.00 5.00 431742 HPB 2017 09 04 11 55 00 5230-99 G co CCGG 131.600 -999.990 ... V2 2017 10 05 15 37 00 47.8011 11.0245 941.00 936.00 5.00 431743 HPB 2017 09 11 11 55 00 3744-99 G co CCGG 133.200 -999.990 ... V2 2017 10 05 14 18 00 47.8011 11.0245 941.00 936.00 5.00 431740 HPB 2017 09 11 11 55 00 5068-99 G co CCGG 133.310 -999.990 ... V2 2017 10 05 14 33 00 47.8011 11.0245 941.00 936.00 5.00 431741 HPB 2017 09 18 11 55 00 2422-99 G co CCGG 126.040 -999.990 ... V2 2017 10 25 15 41 00 47.8011 11.0245 941.00 936.00 5.00 432695 HPB 2017 09 18 11 55 00 3640-99 G co CCGG 126.900 -999.990 ... V2 2017 10 25 15 57 00 47.8011 11.0245 941.00 936.00 5.00 432696 HPB 2017 09 25 11 55 00 5281-99 G co CCGG 152.990 -999.990 ... V2 2017 10 25 16 29 00 47.8011 11.0245 941.00 936.00 5.00 432697 HPB 2017 09 25 11 55 00 619-99 G co CCGG 152.690 -999.990 ... V2 2017 10 25 16 13 00 47.8011 11.0245 941.00 936.00 5.00 432698 HPB 2017 10 02 11 55 00 2815-99 G co CCGG 146.540 -999.990 ... V2 2017 11 01 13 43 00 47.8011 11.0245 941.00 936.00 5.00 433333 HPB 2017 10 02 11 55 00 3935-99 G co CCGG 148.350 -999.990 ... V2 2017 11 01 13 59 00 47.8011 11.0245 941.00 936.00 5.00 433334 HPB 2017 10 09 11 58 00 5462-99 G co CCGG 124.790 -999.990 ... V2 2017 11 01 14 15 00 47.8011 11.0245 941.00 936.00 5.00 433331 HPB 2017 10 09 11 58 00 5630-99 G co CCGG 124.890 -999.990 ... V2 2017 11 01 14 31 00 47.8011 11.0245 941.00 936.00 5.00 433332 HPB 2017 10 16 11 55 00 2759-99 G co CCGG 116.120 -999.990 ... V2 2017 11 22 08 24 00 47.8011 11.0245 941.00 936.00 5.00 434436 HPB 2017 10 16 11 55 00 4509-99 G co CCGG 115.530 -999.990 ... V2 2017 11 22 08 40 00 47.8011 11.0245 941.00 936.00 5.00 434437 HPB 2017 10 23 11 55 00 1868-99 G co CCGG 128.310 -999.990 ... V2 2017 11 22 08 56 00 47.8011 11.0245 941.00 936.00 5.00 434438 HPB 2017 10 23 11 55 00 4963-99 G co CCGG 129.260 -999.990 ... V2 2017 11 22 09 12 00 47.8011 11.0245 941.00 936.00 5.00 434439 HPB 2017 11 02 12 55 00 1658-99 G co CCGG 138.260 -999.990 ... V2 2017 11 29 13 51 00 47.8011 11.0245 941.00 936.00 5.00 434704 HPB 2017 11 02 12 55 00 5404-99 G co CCGG 137.980 -999.990 ... V2 2017 11 29 14 07 00 47.8011 11.0245 941.00 936.00 5.00 434705 HPB 2017 11 06 11 55 00 3119-99 G co CCGG 156.570 -999.990 ... V2 2017 11 29 13 19 00 47.8011 11.0245 941.00 936.00 5.00 434702 HPB 2017 11 06 11 55 00 4606-99 G co CCGG 156.750 -999.990 ... V2 2017 11 29 13 35 00 47.8011 11.0245 941.00 936.00 5.00 434703 HPB 2017 11 13 11 55 00 4410-99 G co CCGG 147.290 -999.990 ... V2 2017 12 13 14 33 00 47.8011 11.0245 941.00 936.00 5.00 435398 HPB 2017 11 13 11 55 00 4494-99 G co CCGG 147.150 -999.990 ... V2 2017 12 13 14 49 00 47.8011 11.0245 941.00 936.00 5.00 435399 HPB 2017 11 21 11 55 00 2631-99 G co CCGG 104.340 -999.990 ... V2 2017 12 13 14 02 00 47.8011 11.0245 941.00 936.00 5.00 435402 HPB 2017 11 21 11 55 00 4710-99 G co CCGG 104.930 -999.990 ... V2 2017 12 13 14 17 00 47.8011 11.0245 941.00 936.00 5.00 435403 HPB 2017 11 27 11 55 00 143-99 G co CCGG 128.890 -999.990 ... V2 2018 01 03 15 19 00 47.8011 11.0245 941.00 936.00 5.00 436257 HPB 2017 11 27 11 55 00 5506-99 G co CCGG 130.440 -999.990 ... V2 2018 01 03 15 34 00 47.8011 11.0245 941.00 936.00 5.00 436258 HPB 2017 12 04 11 55 00 4647-99 G co CCGG 150.190 -999.990 ... V2 2018 01 03 16 54 00 47.8011 11.0245 941.00 936.00 5.00 436259 HPB 2017 12 04 11 55 00 5458-99 G co CCGG 151.850 -999.990 ... V2 2018 01 03 17 10 00 47.8011 11.0245 941.00 936.00 5.00 436260 HPB 2017 12 11 11 55 00 1009-99 G co CCGG 114.070 -999.990 ... V2 2018 01 23 16 56 00 47.8011 11.0245 941.00 936.00 5.00 437378 HPB 2017 12 11 11 55 00 2302-99 G co CCGG 114.480 -999.990 ... V2 2018 01 23 17 12 00 47.8011 11.0245 941.00 936.00 5.00 437379 HPB 2017 12 19 11 56 00 3674-99 G co CCGG 209.440 -999.990 .X. V2 2018 01 23 16 24 00 47.8011 11.0245 941.00 936.00 5.00 437376 HPB 2017 12 19 11 56 00 4307-99 G co CCGG 209.880 -999.990 .X. V2 2018 01 23 16 40 00 47.8011 11.0245 941.00 936.00 5.00 437377 HPB 2017 12 27 11 55 00 2709-99 G co CCGG 154.470 -999.990 ... V2 2018 02 12 11 47 00 47.8011 11.0245 941.00 936.00 5.00 438005 HPB 2017 12 27 11 55 00 4313-99 G co CCGG 153.190 -999.990 ... V2 2018 02 12 12 03 00 47.8011 11.0245 941.00 936.00 5.00 438006 HPB 2018 01 02 11 55 00 1049-99 G co CCGG 134.270 -999.990 ... V2 2018 02 12 11 15 00 47.8011 11.0245 941.00 936.00 5.00 438003 HPB 2018 01 02 11 55 00 3718-99 G co CCGG 134.870 -999.990 ... V2 2018 02 12 11 31 00 47.8011 11.0245 941.00 936.00 5.00 438004 HPB 2018 01 08 11 55 00 2450-99 G co CCGG 131.490 -999.990 ... V2 2018 02 28 13 16 00 47.8011 11.0245 941.00 936.00 5.00 438976 HPB 2018 01 08 11 55 00 5567-99 G co CCGG 133.030 -999.990 ... V2 2018 02 28 13 32 00 47.8011 11.0245 941.00 936.00 5.00 438977 HPB 2018 01 15 11 55 00 1663-99 G co CCGG 136.560 -999.990 ... V2 2018 02 28 13 00 00 47.8011 11.0245 941.00 936.00 5.00 438974 HPB 2018 01 15 11 55 00 584-99 G co CCGG 136.440 -999.990 ... V2 2018 02 28 12 45 00 47.8011 11.0245 941.00 936.00 5.00 438975 HPB 2018 01 22 11 55 00 3882-99 G co CCGG 116.980 -999.990 ... V2 2018 02 23 14 15 00 47.8011 11.0245 941.00 936.00 5.00 438879 HPB 2018 01 22 11 55 00 4292-99 G co CCGG 115.870 -999.990 ... V2 2018 02 23 14 31 00 47.8011 11.0245 941.00 936.00 5.00 438880 HPB 2018 01 29 11 55 00 2467-99 G co CCGG 120.450 -999.990 ... V2 2018 02 23 13 43 00 47.8011 11.0245 941.00 936.00 5.00 438881 HPB 2018 01 29 11 55 00 3214-99 G co CCGG 120.740 -999.990 ... V2 2018 02 23 13 59 00 47.8011 11.0245 941.00 936.00 5.00 438882 HPB 2018 02 05 11 55 00 1940-99 G co CCGG 202.870 -999.990 ... V2 2018 03 08 16 14 00 47.8011 11.0245 941.00 936.00 5.00 439834 HPB 2018 02 05 11 55 00 872-99 G co CCGG 200.710 -999.990 ... V2 2018 03 08 15 58 00 47.8011 11.0245 941.00 936.00 5.00 439835 HPB 2018 02 13 11 55 00 2783-99 G co CCGG 158.620 -999.990 ... V2 2018 03 07 14 33 00 47.8011 11.0245 941.00 936.00 5.00 439586 HPB 2018 02 13 11 55 00 4659-99 G co CCGG 158.410 -999.990 ... V2 2018 03 07 14 49 00 47.8011 11.0245 941.00 936.00 5.00 439587 HPB 2018 02 26 11 55 00 27-99 G co CCGG 229.390 -999.990 .X. V2 2018 03 20 14 06 00 47.8011 11.0245 941.00 936.00 5.00 440272 HPB 2018 02 26 11 55 00 3945-99 G co CCGG 228.890 -999.990 .X. V2 2018 03 20 14 22 00 47.8011 11.0245 941.00 936.00 5.00 440273 HPB 2018 03 05 11 55 00 3723-99 G co CCGG 164.930 -999.990 ... V2 2018 03 28 12 48 00 47.8011 11.0245 941.00 936.00 5.00 440722 HPB 2018 03 05 11 55 00 4071-99 G co CCGG 164.870 -999.990 ... V2 2018 03 28 13 03 00 47.8011 11.0245 941.00 936.00 5.00 440723 HPB 2018 03 12 11 55 00 3169-99 G co CCGG 150.760 -999.990 ... V2 2018 03 28 13 19 00 47.8011 11.0245 941.00 936.00 5.00 440720 HPB 2018 03 12 11 55 00 3351-99 G co CCGG 151.390 -999.990 ... V2 2018 03 28 13 35 00 47.8011 11.0245 941.00 936.00 5.00 440721 HPB 2018 03 19 11 55 00 1415-99 G co CCGG 244.610 -999.990 .X. V2 2018 04 19 12 10 00 47.8011 11.0245 941.00 936.00 5.00 441725 HPB 2018 03 19 11 55 00 219-99 G co CCGG 286.770 -999.990 N.. V2 2018 04 19 11 54 00 47.8011 11.0245 941.00 936.00 5.00 441726 HPB 2018 03 26 11 55 00 1174-99 G co CCGG 191.250 -999.990 ... V2 2018 04 19 11 22 00 47.8011 11.0245 941.00 936.00 5.00 441723 HPB 2018 03 26 11 55 00 2727-99 G co CCGG 190.420 -999.990 ... V2 2018 04 19 11 38 00 47.8011 11.0245 941.00 936.00 5.00 441724 HPB 2018 04 03 11 55 00 1873-99 G co CCGG 129.270 -999.990 ... V2 2018 05 04 15 23 00 47.8011 11.0245 941.00 936.00 5.00 442657 HPB 2018 04 03 11 55 00 324-99 G co CCGG 129.690 -999.990 ... V2 2018 05 04 15 07 00 47.8011 11.0245 941.00 936.00 5.00 442658 HPB 2018 04 09 11 55 00 1093-99 G co CCGG 146.700 -999.990 ... V2 2018 05 04 15 54 00 47.8011 11.0245 941.00 936.00 5.00 442655 HPB 2018 04 09 11 55 00 3881-99 G co CCGG 146.810 -999.990 ... V2 2018 05 04 15 38 00 47.8011 11.0245 941.00 936.00 5.00 442656 HPB 2018 04 16 11 55 00 4935-99 G co CCGG 155.810 -999.990 ... V2 2018 05 21 12 18 00 47.8011 11.0245 941.00 936.00 5.00 443413 HPB 2018 04 16 11 55 00 92-99 G co CCGG 156.020 -999.990 ... V2 2018 05 21 12 02 00 47.8011 11.0245 941.00 936.00 5.00 443412 HPB 2018 04 23 11 56 00 1858-99 G co CCGG 132.530 -999.990 ... V2 2018 05 21 12 34 00 47.8011 11.0245 941.00 936.00 5.00 443410 HPB 2018 04 23 11 56 00 4209-99 G co CCGG 133.570 -999.990 ... V2 2018 05 21 12 49 00 47.8011 11.0245 941.00 936.00 5.00 443411 HPB 2018 05 02 11 55 00 2058-99 G co CCGG 151.560 -999.990 ... V2 2018 06 05 11 28 00 47.8011 11.0245 941.00 936.00 5.00 444511 HPB 2018 05 02 11 55 00 2998-99 G co CCGG 151.980 -999.990 ... V2 2018 06 05 11 44 00 47.8011 11.0245 941.00 936.00 5.00 444512 HPB 2018 05 07 11 55 00 255-99 G co CCGG 147.240 -999.990 ... V2 2018 06 05 10 56 00 47.8011 11.0245 941.00 936.00 5.00 444509 HPB 2018 05 07 11 55 00 2957-99 G co CCGG 146.390 -999.990 ... V2 2018 06 05 11 12 00 47.8011 11.0245 941.00 936.00 5.00 444510 HPB 2018 05 14 11 55 00 1586-99 G co CCGG 138.180 -999.990 ... V2 2018 06 13 16 34 00 47.8011 11.0245 941.00 936.00 5.00 445029 HPB 2018 05 14 11 55 00 2601-99 G co CCGG 138.010 -999.990 ... V2 2018 06 13 16 50 00 47.8011 11.0245 941.00 936.00 5.00 445030 HPB 2018 05 22 11 55 00 1469-99 G co CCGG 140.760 -999.990 N.. V2 2018 06 14 09 04 00 47.8011 11.0245 941.00 936.00 5.00 445027 HPB 2018 05 22 11 55 00 4631-99 G co CCGG 137.210 -999.990 ... V2 2018 06 14 09 20 00 47.8011 11.0245 941.00 936.00 5.00 445028 HPB 2018 05 23 11 55 00 2271-99 G co CCGG 132.580 -999.990 ... V2 2018 06 26 09 34 00 47.8011 11.0245 941.00 936.00 5.00 445430 HPB 2018 05 23 11 55 00 3540-99 G co CCGG 133.600 -999.990 ... V2 2018 06 26 09 50 00 47.8011 11.0245 941.00 936.00 5.00 445431 HPB 2018 05 28 11 55 00 35-99 G co CCGG 119.290 -999.990 ... V2 2018 06 25 14 09 00 47.8011 11.0245 941.00 936.00 5.00 445502 HPB 2018 05 28 11 55 00 4375-99 G co CCGG 119.570 -999.990 ... V2 2018 06 25 14 24 00 47.8011 11.0245 941.00 936.00 5.00 445503 HPB 2018 06 04 11 55 00 2593-99 G co CCGG 124.780 -999.990 ... V2 2018 06 27 11 17 00 47.8011 11.0245 941.00 936.00 5.00 445607 HPB 2018 06 04 11 55 00 3159-99 G co CCGG 123.870 -999.990 ... V2 2018 06 27 11 33 00 47.8011 11.0245 941.00 936.00 5.00 445608 HPB 2018 06 11 11 55 00 1008-99 G co CCGG 108.750 -999.990 ... V2 2018 06 27 12 04 00 47.8011 11.0245 941.00 936.00 5.00 445610 HPB 2018 06 11 11 55 00 526-99 G co CCGG 108.400 -999.990 ... V2 2018 06 27 11 49 00 47.8011 11.0245 941.00 936.00 5.00 445609 HPB 2018 06 18 11 55 00 1026-99 G co CCGG 116.040 -999.990 ... V2 2018 07 17 12 51 00 47.8011 11.0245 941.00 936.00 5.00 446426 HPB 2018 06 18 11 55 00 2745-99 G co CCGG 116.390 -999.990 ... V2 2018 07 17 13 07 00 47.8011 11.0245 941.00 936.00 5.00 446427 HPB 2018 06 25 11 55 00 5583-99 G co CCGG 99.490 -999.990 ... V2 2018 07 17 12 20 00 47.8011 11.0245 941.00 936.00 5.00 446428 HPB 2018 07 02 11 55 00 150-99 G co CCGG 109.140 -999.990 ... V2 2018 08 07 09 01 00 47.8011 11.0245 941.00 936.00 5.00 447042 HPB 2018 07 02 11 55 00 3269-99 G co CCGG 109.940 -999.990 ... V2 2018 08 07 09 17 00 47.8011 11.0245 941.00 936.00 5.00 447043 HPB 2018 07 10 11 55 00 456-99 G co CCGG 110.790 -999.990 ... V2 2018 08 06 17 14 00 47.8011 11.0245 941.00 936.00 5.00 447044 HPB 2018 07 10 11 55 00 5781-99 G co CCGG 110.370 -999.990 ... V2 2018 08 06 17 29 00 47.8011 11.0245 941.00 936.00 5.00 447045 HPB 2018 07 17 11 55 00 1316-99 G co CCGG 106.880 -999.990 ... V2 2018 08 10 15 30 00 47.8011 11.0245 941.00 936.00 5.00 447252 HPB 2018 07 17 11 55 00 4618-99 G co CCGG 107.500 -999.990 ... V2 2018 08 10 15 14 00 47.8011 11.0245 941.00 936.00 5.00 447251 HPB 2018 07 23 11 55 00 3308-99 G co CCGG 143.290 -999.990 ... V2 2018 08 10 15 46 00 47.8011 11.0245 941.00 936.00 5.00 447253 HPB 2018 07 23 11 55 00 3724-99 G co CCGG 141.870 -999.990 ... V2 2018 08 10 16 02 00 47.8011 11.0245 941.00 936.00 5.00 447254 HPB 2018 07 30 11 55 00 4277-99 G co CCGG 124.000 -999.990 ... V2 2018 08 28 15 38 00 47.8011 11.0245 941.00 936.00 5.00 448165 HPB 2018 07 30 11 55 00 857-99 G co CCGG 122.830 -999.990 ... V2 2018 08 28 15 22 00 47.8011 11.0245 941.00 936.00 5.00 448166 HPB 2018 08 06 11 55 00 1576-99 G co CCGG 147.920 -999.990 ... V2 2018 08 28 16 09 00 47.8011 11.0245 941.00 936.00 5.00 448167 HPB 2018 08 06 11 55 00 185-99 G co CCGG 147.180 -999.990 ... V2 2018 08 28 15 53 00 47.8011 11.0245 941.00 936.00 5.00 448168 HPB 2018 08 13 11 55 00 2487-99 G co CCGG 120.610 -999.990 ... V2 2018 09 11 12 04 00 47.8011 11.0245 941.00 936.00 5.00 448759 HPB 2018 08 13 11 55 00 4087-99 G co CCGG 120.360 -999.990 ... V2 2018 09 11 12 19 00 47.8011 11.0245 941.00 936.00 5.00 448760 HPB 2018 08 21 11 55 00 1247-99 G co CCGG 144.240 -999.990 ... V2 2018 09 11 11 48 00 47.8011 11.0245 941.00 936.00 5.00 448761 HPB 2018 08 21 11 55 00 136-99 G co CCGG 144.620 -999.990 ... V2 2018 09 11 11 32 00 47.8011 11.0245 941.00 936.00 5.00 448762 HPB 2018 08 27 11 55 00 4447-99 G co CCGG 129.660 -999.990 ... V2 2018 09 19 17 01 00 47.8011 11.0245 941.00 936.00 5.00 449192 HPB 2018 08 27 11 55 00 4817-99 G co CCGG 130.380 -999.990 ... V2 2018 09 19 17 17 00 47.8011 11.0245 941.00 936.00 5.00 449193 HPB 2018 09 04 11 55 00 3722-99 G co CCGG 164.590 -999.990 ... V2 2018 09 19 17 33 00 47.8011 11.0245 941.00 936.00 5.00 449190 HPB 2018 09 04 11 55 00 4159-99 G co CCGG 165.490 -999.990 ... V2 2018 09 19 17 48 00 47.8011 11.0245 941.00 936.00 5.00 449191 HPB 2018 09 10 11 55 00 105-99 G co CCGG 148.210 -999.990 ... V2 2018 10 05 12 06 00 47.8011 11.0245 941.00 936.00 5.00 449799 HPB 2018 09 10 11 55 00 754-99 G co CCGG 147.620 -999.990 ... V2 2018 10 05 11 50 00 47.8011 11.0245 941.00 936.00 5.00 449800 HPB 2018 09 17 11 55 00 2395-99 G co CCGG 145.890 -999.990 ... V2 2018 10 03 12 44 00 47.8011 11.0245 941.00 936.00 5.00 449706 HPB 2018 09 17 11 55 00 5484-99 G co CCGG 145.250 -999.990 ... V2 2018 10 03 13 00 00 47.8011 11.0245 941.00 936.00 5.00 449707 HPB 2018 09 24 12 34 56 2715-99 G co CCGG 127.500 -999.990 ... V2 2018 10 24 08 59 00 47.8011 11.0245 941.00 936.00 5.00 450554 HPB 2018 09 24 12 34 56 4326-99 G co CCGG 126.440 -999.990 ... V2 2018 10 24 08 44 00 47.8011 11.0245 941.00 936.00 5.00 450553 HPB 2018 10 01 11 55 00 2691-99 G co CCGG 211.620 -999.990 .X. V2 2018 10 23 17 20 00 47.8011 11.0245 941.00 936.00 5.00 450555 HPB 2018 10 01 11 55 00 5179-99 G co CCGG 211.310 -999.990 .X. V2 2018 10 23 17 36 00 47.8011 11.0245 941.00 936.00 5.00 450556 HPB 2018 10 08 11 55 00 2556-99 G co CCGG 135.870 -999.990 ... V2 2018 11 07 16 14 00 47.8011 11.0245 941.00 936.00 5.00 451108 HPB 2018 10 08 11 55 00 4753-99 G co CCGG 135.590 -999.990 ... V2 2018 11 07 15 58 00 47.8011 11.0245 941.00 936.00 5.00 451107 HPB 2018 10 15 11 55 00 1799-99 G co CCGG 117.490 -999.990 ... V2 2018 11 08 09 07 00 47.8011 11.0245 941.00 936.00 5.00 451109 HPB 2018 10 15 11 55 00 3433-99 G co CCGG 117.100 -999.990 ... V2 2018 11 08 09 23 00 47.8011 11.0245 941.00 936.00 5.00 451110 HPB 2018 10 23 11 55 00 4766-99 G co CCGG 157.900 -999.990 ... V2 2018 11 28 11 29 00 47.8011 11.0245 941.00 936.00 5.00 451758 HPB 2018 10 23 11 55 00 4823-99 G co CCGG 157.480 -999.990 ... V2 2018 11 28 11 45 00 47.8011 11.0245 941.00 936.00 5.00 451759 HPB 2018 10 29 11 55 00 2021-99 G co CCGG 191.830 -999.990 ... V2 2018 11 28 10 58 00 47.8011 11.0245 941.00 936.00 5.00 451756 HPB 2018 10 29 11 55 00 2531-99 G co CCGG 193.890 -999.990 ... V2 2018 11 28 11 13 00 47.8011 11.0245 941.00 936.00 5.00 451757 HPB 2018 11 05 11 55 00 2860-99 G co CCGG 158.140 -999.990 N.. V2 2018 12 18 15 51 00 47.8011 11.0245 941.00 936.00 5.00 452601 HPB 2018 11 05 11 55 00 4612-99 G co CCGG 150.460 -999.990 N.. V2 2018 12 18 16 07 00 47.8011 11.0245 941.00 936.00 5.00 452602 HPB 2018 11 14 11 57 00 1277-99 G co CCGG 122.960 -999.990 ... V2 2018 12 18 13 13 00 47.8011 11.0245 941.00 936.00 5.00 452624 HPB 2018 11 14 11 57 00 5479-99 G co CCGG 123.010 -999.990 ... V2 2018 12 18 13 29 00 47.8011 11.0245 941.00 936.00 5.00 452625 HPB 2018 11 19 11 55 00 410-99 G co CCGG 188.150 -999.990 ... V2 2019 01 23 11 00 00 47.8011 11.0245 941.00 936.00 5.00 453359 HPB 2018 11 19 11 55 00 716-99 G co CCGG 186.740 -999.990 ... V2 2019 01 23 11 16 00 47.8011 11.0245 941.00 936.00 5.00 453360 HPB 2018 11 27 11 55 00 3996-99 G co CCGG 292.240 -999.990 .X. V2 2019 01 23 10 44 00 47.8011 11.0245 941.00 936.00 5.00 453361 HPB 2018 11 27 11 55 00 461-99 G co CCGG 293.710 -999.990 .X. V2 2019 01 23 10 28 00 47.8011 11.0245 941.00 936.00 5.00 453362 HPB 2018 12 03 11 55 00 3123-99 G co CCGG 115.180 -999.990 ... V2 2019 01 24 16 25 00 47.8011 11.0245 941.00 936.00 5.00 453510 HPB 2018 12 03 11 55 00 5354-99 G co CCGG 114.700 -999.990 ... V2 2019 01 24 16 41 00 47.8011 11.0245 941.00 936.00 5.00 453511 HPB 2018 12 10 11 55 00 3816-99 G co CCGG 135.230 -999.990 ... V2 2019 01 24 12 58 00 47.8011 11.0245 941.00 936.00 5.00 453532 HPB 2018 12 10 11 55 00 747-99 G co CCGG 133.060 -999.990 ... V2 2019 01 24 12 43 00 47.8011 11.0245 941.00 936.00 5.00 453533 HPB 2018 12 17 11 55 00 260-99 G co CCGG 158.600 -999.990 ... V2 2019 01 31 14 39 00 47.8011 11.0245 941.00 936.00 5.00 453490 HPB 2018 12 17 11 55 00 4874-99 G co CCGG 158.330 -999.990 ... V2 2019 01 31 14 55 00 47.8011 11.0245 941.00 936.00 5.00 453491 HPB 2018 12 27 11 55 00 2909-99 G co CCGG 115.500 -999.990 ... V2 2019 01 31 13 20 00 47.8011 11.0245 941.00 936.00 5.00 453492 HPB 2018 12 27 11 55 00 360-99 G co CCGG 250.750 -999.990 A.. V2 2019 01 31 13 05 00 47.8011 11.0245 941.00 936.00 5.00 453493 HPB 2019 01 02 11 55 00 4020-99 G co CCGG 135.490 -999.990 ... V2 2019 02 05 14 00 00 47.8011 11.0245 941.00 936.00 5.00 453650 HPB 2019 01 02 11 55 00 4743-99 G co CCGG 135.550 -999.990 ... V2 2019 02 05 14 16 00 47.8011 11.0245 941.00 936.00 5.00 453651 HPB 2019 01 07 11 55 00 1626-99 G co CCGG 188.580 -999.990 ... V2 2019 02 05 14 31 00 47.8011 11.0245 941.00 936.00 5.00 453648 HPB 2019 01 07 11 55 00 5456-99 G co CCGG 189.810 -999.990 ... V2 2019 02 05 14 47 00 47.8011 11.0245 941.00 936.00 5.00 453649 HPB 2019 01 14 11 55 00 5117-99 G co CCGG 138.050 -999.990 ... V2 2019 02 27 11 26 00 47.8011 11.0245 941.00 936.00 5.00 454449 HPB 2019 01 14 11 55 00 5118-99 G co CCGG 137.320 -999.990 ... V2 2019 02 27 11 42 00 47.8011 11.0245 941.00 936.00 5.00 454450 HPB 2019 01 22 11 55 00 3763-99 G co CCGG 274.680 -999.990 .X. V2 2019 02 27 11 58 00 47.8011 11.0245 941.00 936.00 5.00 454451 HPB 2019 01 22 11 55 00 3764-99 G co CCGG 277.870 -999.990 .X. V2 2019 02 27 12 14 00 47.8011 11.0245 941.00 936.00 5.00 454452 HPB 2019 01 28 11 55 00 1845-99 G co CCGG 146.620 -999.990 ... V2 2019 03 01 16 01 00 47.8011 11.0245 941.00 936.00 5.00 454949 HPB 2019 01 28 11 55 00 4606-99 G co CCGG 146.260 -999.990 ... V2 2019 03 01 16 17 00 47.8011 11.0245 941.00 936.00 5.00 454950 HPB 2019 02 04 11 55 00 3669-99 G co CCGG 232.700 -999.990 A.. V2 2019 03 04 09 51 00 47.8011 11.0245 941.00 936.00 5.00 454947 HPB 2019 02 04 11 55 00 4896-99 G co CCGG 233.060 -999.990 A.. V2 2019 03 04 10 06 00 47.8011 11.0245 941.00 936.00 5.00 454948 HPB 2019 02 11 11 55 00 2696-99 G co CCGG 152.770 -999.990 ... V2 2019 03 14 15 29 00 47.8011 11.0245 941.00 936.00 5.00 455599 HPB 2019 02 11 11 55 00 4909-99 G co CCGG 152.300 -999.990 ... V2 2019 03 14 15 44 00 47.8011 11.0245 941.00 936.00 5.00 455600 HPB 2019 02 19 11 55 00 2595-99 G co CCGG 138.420 -999.990 ... V2 2019 03 14 16 00 00 47.8011 11.0245 941.00 936.00 5.00 455597 HPB 2019 02 19 11 55 00 4295-99 G co CCGG 138.460 -999.990 ... V2 2019 03 14 16 16 00 47.8011 11.0245 941.00 936.00 5.00 455598 HPB 2019 02 25 11 55 00 1612-99 G co CCGG 177.650 -999.990 ... V2 2019 04 04 10 48 00 47.8011 11.0245 941.00 936.00 5.00 456460 HPB 2019 02 25 11 55 00 3737-99 G co CCGG 177.400 -999.990 ... V2 2019 04 04 11 04 00 47.8011 11.0245 941.00 936.00 5.00 456461 HPB 2019 03 05 11 55 00 4151-99 G co CCGG 140.190 -999.990 ... V2 2019 04 04 10 33 00 47.8011 11.0245 941.00 936.00 5.00 456458 HPB 2019 03 05 11 55 00 535-99 G co CCGG 140.470 -999.990 ... V2 2019 04 04 10 17 00 47.8011 11.0245 941.00 936.00 5.00 456459 HPB 2019 03 11 11 55 00 3310-99 G co CCGG 140.840 -999.990 ... V2 2019 04 16 15 38 00 47.8011 11.0245 941.00 936.00 5.00 456790 HPB 2019 03 11 11 55 00 937-99 G co CCGG 142.430 -999.990 ... V2 2019 04 16 15 22 00 47.8011 11.0245 941.00 936.00 5.00 456791 HPB 2019 03 18 11 55 00 3203-99 G co CCGG 139.340 -999.990 ... V2 2019 04 16 14 51 00 47.8011 11.0245 941.00 936.00 5.00 456788 HPB 2019 03 18 11 55 00 5608-99 G co CCGG 140.200 -999.990 ... V2 2019 04 16 15 07 00 47.8011 11.0245 941.00 936.00 5.00 456789 HPB 2019 03 25 13 11 00 2232-99 G co CCGG 142.850 -999.990 ... V2 2019 05 01 16 27 00 47.8011 11.0245 941.00 936.00 5.00 457653 HPB 2019 03 25 13 11 00 3836-99 G co CCGG 143.390 -999.990 ... V2 2019 05 01 16 42 00 47.8011 11.0245 941.00 936.00 5.00 457654 HPB 2019 04 01 11 55 00 2884-99 G co CCGG 183.320 -999.990 ... V2 2019 05 01 15 55 00 47.8011 11.0245 941.00 936.00 5.00 457655 HPB 2019 04 01 11 55 00 4191-99 G co CCGG 182.600 -999.990 ... V2 2019 05 01 16 11 00 47.8011 11.0245 941.00 936.00 5.00 457656 HPB 2019 04 08 11 55 00 1662-99 G co CCGG 164.780 -999.990 ... V2 2019 05 10 15 58 00 47.8011 11.0245 941.00 936.00 5.00 458233 HPB 2019 04 08 11 55 00 4307-99 G co CCGG 165.270 -999.990 ... V2 2019 05 10 15 43 00 47.8011 11.0245 941.00 936.00 5.00 458234 HPB 2019 04 15 11 55 00 3799-99 G co CCGG 232.420 -999.990 .X. V2 2019 05 10 16 14 00 47.8011 11.0245 941.00 936.00 5.00 458235 HPB 2019 04 15 11 55 00 5354-99 G co CCGG 231.340 -999.990 .X. V2 2019 05 10 16 30 00 47.8011 11.0245 941.00 936.00 5.00 458236 HPB 2019 04 23 12 34 56 1845-99 G co CCGG 143.770 -999.990 ... V2 2019 06 05 16 45 00 47.8011 11.0245 941.00 936.00 5.00 459395 HPB 2019 04 23 12 34 56 3231-99 G co CCGG 144.390 -999.990 ... V2 2019 06 05 16 29 00 47.8011 11.0245 941.00 936.00 5.00 459396 HPB 2019 04 29 11 55 00 3714-99 G co CCGG 146.150 -999.990 ... V2 2019 06 06 13 38 00 47.8011 11.0245 941.00 936.00 5.00 459211 HPB 2019 04 29 11 55 00 4738-99 G co CCGG 149.860 -999.990 ... V2 2019 06 06 13 22 00 47.8011 11.0245 941.00 936.00 5.00 459210 HPB 2019 05 06 11 55 00 3595-99 G co CCGG 145.890 -999.990 ... V2 2019 06 10 15 14 00 47.8011 11.0245 941.00 936.00 5.00 459481 HPB 2019 05 06 11 55 00 3874-99 G co CCGG 146.280 -999.990 ... V2 2019 06 10 15 30 00 47.8011 11.0245 941.00 936.00 5.00 459482 HPB 2019 05 13 11 55 00 2523-99 G co CCGG 134.190 -999.990 ... V2 2019 06 10 14 59 00 47.8011 11.0245 941.00 936.00 5.00 459484 HPB 2019 05 13 11 55 00 953-99 G co CCGG 135.850 -999.990 ... V2 2019 06 10 14 43 00 47.8011 11.0245 941.00 936.00 5.00 459483 HPB 2019 05 20 11 55 00 1185-99 G co CCGG 144.640 -999.990 ... V2 2019 06 26 09 47 00 47.8011 11.0245 941.00 936.00 5.00 460164 HPB 2019 05 20 11 55 00 4963-99 G co CCGG 143.500 -999.990 ... V2 2019 06 26 10 03 00 47.8011 11.0245 941.00 936.00 5.00 460165 HPB 2019 05 28 11 55 00 2479-99 G co CCGG 113.090 -999.990 ... V2 2019 06 26 09 31 00 47.8011 11.0245 941.00 936.00 5.00 460163 HPB 2019 05 28 11 55 00 3614-99 G co CCGG 111.780 -999.990 ... V2 2019 06 26 09 15 00 47.8011 11.0245 941.00 936.00 5.00 460162 HPB 2019 06 03 11 55 00 4295-99 G co CCGG 124.780 -999.990 ... V2 2019 07 08 12 49 00 47.8011 11.0245 941.00 936.00 5.00 460920 HPB 2019 06 03 11 55 00 4338-99 G co CCGG 124.300 -999.990 ... V2 2019 07 08 13 05 00 47.8011 11.0245 941.00 936.00 5.00 460921 HPB 2019 06 11 11 55 00 167-99 G co CCGG 123.540 -999.990 ... V2 2019 07 08 12 17 00 47.8011 11.0245 941.00 936.00 5.00 460918 HPB 2019 06 11 11 55 00 2044-99 G co CCGG 122.270 -999.990 ... V2 2019 07 08 12 33 00 47.8011 11.0245 941.00 936.00 5.00 460919 HPB 2019 06 17 11 55 00 1762-99 G co CCGG 124.750 -999.990 ... V2 2019 08 05 11 31 00 47.8011 11.0245 941.00 936.00 5.00 461894 HPB 2019 06 17 11 55 00 4737-99 G co CCGG 125.050 -999.990 ... V2 2019 08 05 11 15 00 47.8011 11.0245 941.00 936.00 5.00 461895 HPB 2019 06 24 11 55 00 5571-99 G co CCGG 123.600 -999.990 ... V2 2019 08 05 10 44 00 47.8011 11.0245 941.00 936.00 5.00 461896 HPB 2019 06 24 11 55 00 864-99 G co CCGG 123.700 -999.990 ... V2 2019 08 05 11 00 00 47.8011 11.0245 941.00 936.00 5.00 461897 HPB 2019 07 01 11 55 00 3171-99 G co CCGG 119.130 -999.990 ... AR2 2019 08 09 11 52 00 47.8011 11.0245 941.00 936.00 5.00 462933 HPB 2019 07 01 11 55 00 3467-99 G co CCGG 119.290 -999.990 ... AR2 2019 08 09 11 37 43 47.8011 11.0245 941.00 936.00 5.00 462934 HPB 2019 07 08 11 55 00 3307-99 G co CCGG 116.000 -999.990 ... AR2 2019 08 09 12 06 17 47.8011 11.0245 941.00 936.00 5.00 462931 HPB 2019 07 08 11 55 00 5167-99 G co CCGG 115.900 -999.990 ... AR2 2019 08 09 12 20 34 47.8011 11.0245 941.00 936.00 5.00 462932 HPB 2019 07 15 11 55 00 4270-99 G co CCGG 109.680 -999.990 ... AR2 2019 08 16 14 08 14 47.8011 11.0245 941.00 936.00 5.00 463244 HPB 2019 07 15 11 55 00 4779-99 G co CCGG 109.660 -999.990 ... AR2 2019 08 16 14 22 29 47.8011 11.0245 941.00 936.00 5.00 463245 HPB 2019 07 22 11 55 00 3282-99 G co CCGG 123.870 -999.990 ... AR2 2019 08 16 12 07 02 47.8011 11.0245 941.00 936.00 5.00 463246 HPB 2019 07 22 11 55 00 966-99 G co CCGG 123.950 -999.990 ... AR2 2019 08 16 11 52 45 47.8011 11.0245 941.00 936.00 5.00 463247 HPB 2019 07 30 11 55 00 1157-99 G co CCGG 140.020 -999.990 ... AR2 2019 09 11 11 52 31 47.8011 11.0245 941.00 936.00 5.00 464385 HPB 2019 07 30 11 55 00 1158-99 G co CCGG 138.310 -999.990 ... AR2 2019 09 11 12 06 45 47.8011 11.0245 941.00 936.00 5.00 464386 HPB 2019 08 05 11 55 00 4945-99 G co CCGG 128.410 -999.990 ... AR2 2019 09 11 11 23 54 47.8011 11.0245 941.00 936.00 5.00 464388 HPB 2019 08 05 11 55 00 4946-99 G co CCGG 130.160 -999.990 ... AR2 2019 09 11 11 38 15 47.8011 11.0245 941.00 936.00 5.00 464387 HPB 2019 08 13 11 55 00 1716-99 G co CCGG 102.280 -999.990 ... AR2 2019 10 03 13 22 55 47.8011 11.0245 941.00 936.00 5.00 465128 HPB 2019 08 13 11 55 00 4245-99 G co CCGG 101.950 -999.990 ... AR2 2019 10 03 13 37 14 47.8011 11.0245 941.00 936.00 5.00 465129 HPB 2019 08 19 11 55 00 1306-99 G co CCGG 108.760 -999.990 ... AR2 2019 10 03 13 51 34 47.8011 11.0245 941.00 936.00 5.00 465130 HPB 2019 08 19 11 55 00 3773-99 G co CCGG 106.940 -999.990 ... AR2 2019 10 03 14 05 55 47.8011 11.0245 941.00 936.00 5.00 465131 HPB 2019 08 26 11 55 00 4112-99 G co CCGG 141.120 -999.990 ... AR2 2019 10 17 08 48 44 47.8011 11.0245 941.00 936.00 5.00 465768 HPB 2019 08 26 11 55 00 4657-99 G co CCGG 140.990 -999.990 ... AR2 2019 10 17 09 03 04 47.8011 11.0245 941.00 936.00 5.00 465769 HPB 2019 09 02 11 55 00 4732-99 G co CCGG 143.630 -999.990 ... AR2 2019 10 08 14 12 22 47.8011 11.0245 941.00 936.00 5.00 465775 HPB 2019 09 02 11 55 00 4909-99 G co CCGG 143.680 -999.990 ... AR2 2019 10 08 14 26 43 47.8011 11.0245 941.00 936.00 5.00 465776 HPB 2019 09 09 11 55 00 217-99 G co CCGG 143.250 -999.990 ... AR2 2019 11 04 15 37 26 47.8011 11.0245 941.00 936.00 5.00 466267 HPB 2019 09 09 11 55 00 3232-99 G co CCGG 143.430 -999.990 ... AR2 2019 11 04 15 51 46 47.8011 11.0245 941.00 936.00 5.00 466268 HPB 2019 09 16 11 55 00 2679-99 G co CCGG 123.210 -999.990 ... AR2 2019 10 31 14 53 56 47.8011 11.0245 941.00 936.00 5.00 466327 HPB 2019 09 16 11 55 00 3301-99 G co CCGG 122.950 -999.990 ... AR2 2019 10 31 15 08 12 47.8011 11.0245 941.00 936.00 5.00 466328 HPB 2019 09 23 11 55 00 2137-99 G co CCGG 109.080 -999.990 ... AR2 2019 10 31 16 48 22 47.8011 11.0245 941.00 936.00 5.00 466563 HPB 2019 09 23 11 55 00 5600-99 G co CCGG 109.290 -999.990 ... AR2 2019 10 31 17 02 41 47.8011 11.0245 941.00 936.00 5.00 466564 HPB 2019 09 30 11 55 00 3808-99 G co CCGG 101.530 -999.990 ... AR2 2019 10 31 16 19 45 47.8011 11.0245 941.00 936.00 5.00 466561 HPB 2019 09 30 11 55 00 933-99 G co CCGG 101.190 -999.990 ... AR2 2019 10 31 16 34 04 47.8011 11.0245 941.00 936.00 5.00 466562 HPB 2019 10 07 11 55 00 4800-99 G co CCGG 114.400 -999.990 ... AR2 2019 11 18 12 33 10 47.8011 11.0245 941.00 936.00 5.00 467421 HPB 2019 10 07 11 55 00 5383-99 G co CCGG 113.990 -999.990 ... AR2 2019 11 18 12 47 29 47.8011 11.0245 941.00 936.00 5.00 467422 HPB 2019 10 14 11 55 00 2383-99 G co CCGG 117.020 -999.990 ... AR2 2019 11 18 13 16 05 47.8011 11.0245 941.00 936.00 5.00 467424 HPB 2019 10 14 11 55 00 949-99 G co CCGG 116.350 -999.990 ... AR2 2019 11 18 13 01 48 47.8011 11.0245 941.00 936.00 5.00 467423 HPB 2019 10 28 11 55 00 2331-99 G co CCGG 132.570 -999.990 ... AR2 2019 11 27 11 21 02 47.8011 11.0245 941.00 936.00 5.00 467669 HPB 2019 10 28 11 55 00 2692-99 G co CCGG 166.690 -999.990 ... AR2 2019 11 27 10 38 16 47.8011 11.0245 941.00 936.00 5.00 467670 HPB 2019 10 28 11 55 00 4767-99 G co CCGG 166.660 -999.990 ... AR2 2019 11 27 10 52 31 47.8011 11.0245 941.00 936.00 5.00 467671 HPB 2019 10 28 11 55 00 5107-99 G co CCGG 132.730 -999.990 ... AR2 2019 11 27 11 06 46 47.8011 11.0245 941.00 936.00 5.00 467668 HPB 2019 11 04 11 55 00 2246-99 G co CCGG 121.030 -999.990 ... AR2 2020 01 07 11 24 29 47.8011 11.0245 941.00 936.00 5.00 468599 HPB 2019 11 04 11 55 00 237-99 G co CCGG 120.930 -999.990 ... AR2 2020 01 07 11 10 12 47.8011 11.0245 941.00 936.00 5.00 468600 HPB 2019 11 12 11 55 00 2909-99 G co CCGG 135.660 -999.990 ... AR2 2020 01 07 11 38 46 47.8011 11.0245 941.00 936.00 5.00 468597 HPB 2019 11 12 11 55 00 3094-99 G co CCGG 136.100 -999.990 ... AR2 2020 01 07 11 53 02 47.8011 11.0245 941.00 936.00 5.00 468598 HPB 2019 11 18 11 55 00 4700-99 G co CCGG 133.170 -999.990 ... AR2 2020 01 21 16 46 51 47.8011 11.0245 941.00 936.00 5.00 468810 HPB 2019 11 18 11 55 00 4844-99 G co CCGG 133.180 -999.990 ... AR2 2020 01 21 17 01 09 47.8011 11.0245 941.00 936.00 5.00 468811 HPB 2019 11 27 11 55 00 5604-99 G co CCGG 122.420 -999.990 ... AR2 2020 01 22 09 27 31 47.8011 11.0245 941.00 936.00 5.00 468812 HPB 2019 11 27 11 55 00 5699-99 G co CCGG 121.350 -999.990 ... AR2 2020 01 22 09 41 49 47.8011 11.0245 941.00 936.00 5.00 468813 HPB 2019 12 02 11 55 00 5071-99 G co CCGG 188.300 -999.990 .X. AR2 2020 02 04 13 44 50 47.8011 11.0245 941.00 936.00 5.00 469855 HPB 2019 12 02 11 55 00 5827-99 G co CCGG 188.850 -999.990 .X. AR2 2020 02 04 13 59 09 47.8011 11.0245 941.00 936.00 5.00 469856 HPB 2019 12 11 11 55 00 54-99 G co CCGG 103.460 -999.990 ... AR2 2020 02 05 16 21 29 47.8011 11.0245 941.00 936.00 5.00 469801 HPB 2019 12 11 11 55 00 727-99 G co CCGG 103.780 -999.990 ... AR2 2020 02 05 16 35 49 47.8011 11.0245 941.00 936.00 5.00 469802 HPB 2019 12 16 11 55 00 2615-99 G co CCGG 108.060 -999.990 ... AR2 2020 03 06 11 37 35 47.8011 11.0245 941.00 936.00 5.00 471218 HPB 2019 12 16 11 55 00 4789-99 G co CCGG 107.940 -999.990 ... AR2 2020 03 06 11 51 57 47.8011 11.0245 941.00 936.00 5.00 471219 HPB 2019 12 23 11 55 00 1712-99 G co CCGG 129.510 -999.990 ... AR2 2020 03 06 12 06 16 47.8011 11.0245 941.00 936.00 5.00 471220 HPB 2019 12 23 11 55 00 2831-99 G co CCGG 129.860 -999.990 ... AR2 2020 03 06 12 20 33 47.8011 11.0245 941.00 936.00 5.00 471221 HPB 2019 12 30 11 55 00 1945-99 G co CCGG 114.920 -999.990 ... AR2 2020 03 02 11 55 19 47.8011 11.0245 941.00 936.00 5.00 471125 HPB 2019 12 30 11 55 00 2986-99 G co CCGG 116.070 -999.990 ... AR2 2020 03 02 12 09 42 47.8011 11.0245 941.00 936.00 5.00 471126 HPB 2020 01 07 11 55 00 3569-99 G co CCGG 166.150 -999.990 ... AR2 2020 03 02 11 26 39 47.8011 11.0245 941.00 936.00 5.00 471127 HPB 2020 01 07 11 55 00 5523-99 G co CCGG 166.860 -999.990 ... AR2 2020 03 02 11 40 59 47.8011 11.0245 941.00 936.00 5.00 471128 HPB 2020 01 14 11 55 00 2424-99 G co CCGG 117.590 -999.990 ... AR2 2020 03 17 13 31 49 47.8011 11.0245 941.00 936.00 5.00 471565 HPB 2020 01 14 11 55 00 5661-99 G co CCGG 116.870 -999.990 ... AR2 2020 03 17 13 46 07 47.8011 11.0245 941.00 936.00 5.00 471566 HPB 2020 01 20 11 55 00 1454-99 G co CCGG 166.360 -999.990 ... AR2 2020 03 17 14 14 45 47.8011 11.0245 941.00 936.00 5.00 471568 HPB 2020 01 20 11 55 00 1981-99 G co CCGG 166.400 -999.990 ... AR2 2020 03 17 14 00 26 47.8011 11.0245 941.00 936.00 5.00 471567 HPB 2020 01 27 11 55 00 3745-99 G co CCGG 137.730 -999.990 ... AR2 2020 03 23 11 51 14 47.8011 11.0245 941.00 936.00 5.00 471691 HPB 2020 01 27 11 55 00 5243-99 G co CCGG 137.400 -999.990 ... AR2 2020 03 23 12 05 35 47.8011 11.0245 941.00 936.00 5.00 471692 HPB 2020 02 05 11 58 00 1647-99 G co CCGG 141.110 -999.990 ... AR2 2020 03 23 11 22 34 47.8011 11.0245 941.00 936.00 5.00 471689 HPB 2020 02 05 11 58 00 5326-99 G co CCGG 139.910 -999.990 ... AR2 2020 03 23 11 36 54 47.8011 11.0245 941.00 936.00 5.00 471690 HPB 2020 02 11 11 55 00 3757-99 G co CCGG 131.280 -999.990 ... AR2 2020 04 07 09 45 11 47.8011 11.0245 941.00 936.00 5.00 472552 HPB 2020 02 11 11 55 00 5147-99 G co CCGG 129.890 -999.990 ... AR2 2020 04 07 09 59 31 47.8011 11.0245 941.00 936.00 5.00 472553 HPB 2020 02 17 11 55 00 1023-99 G co CCGG 125.720 -999.990 ... AR2 2020 04 07 09 16 31 47.8011 11.0245 941.00 936.00 5.00 472554 HPB 2020 02 17 11 55 00 4331-99 G co CCGG 127.920 -999.990 ... AR2 2020 04 07 09 30 51 47.8011 11.0245 941.00 936.00 5.00 472555 HPB 2020 02 25 11 55 00 2066-99 G co CCGG 131.440 -999.990 ... AR2 2020 04 15 13 36 08 47.8011 11.0245 941.00 936.00 5.00 472993 HPB 2020 02 25 11 55 00 2781-99 G co CCGG 131.510 -999.990 ... AR2 2020 04 15 13 50 28 47.8011 11.0245 941.00 936.00 5.00 472994 HPB 2020 03 02 11 55 00 2777-99 G co CCGG 134.480 -999.990 ... AR2 2020 04 14 12 01 53 47.8011 11.0245 941.00 936.00 5.00 472983 HPB 2020 03 02 11 55 00 3941-99 G co CCGG 135.030 -999.990 ... AR2 2020 04 14 12 16 14 47.8011 11.0245 941.00 936.00 5.00 472984 HPB 2020 03 09 11 55 00 4533-99 G co CCGG 147.210 -999.990 ... AR2 2020 06 01 16 22 16 47.8011 11.0245 941.00 936.00 5.00 474999 HPB 2020 03 09 11 55 00 965-99 G co CCGG 146.790 -999.990 ... AR2 2020 06 01 16 07 53 47.8011 11.0245 941.00 936.00 5.00 474998 HPB 2020 03 16 11 55 00 3523-99 G co CCGG 142.820 -999.990 ... AR2 2020 06 01 16 36 38 47.8011 11.0245 941.00 936.00 5.00 475000 HPB 2020 03 16 11 55 00 4185-99 G co CCGG 142.840 -999.990 ... AR2 2020 06 01 16 51 03 47.8011 11.0245 941.00 936.00 5.00 475001 HPB 2020 03 23 11 55 00 1190-99 G co CCGG 154.140 -999.990 ... AR2 2020 04 16 12 25 45 47.8011 11.0245 941.00 936.00 5.00 473139 HPB 2020 03 23 11 55 00 2642-99 G co CCGG 154.110 -999.990 ... AR2 2020 04 16 12 40 04 47.8011 11.0245 941.00 936.00 5.00 473140 HPB 2020 03 30 11 55 00 116-99 G co CCGG 154.440 -999.990 ... AR2 2020 04 16 14 49 13 47.8011 11.0245 941.00 936.00 5.00 473129 HPB 2020 03 30 11 55 00 3980-99 G co CCGG 154.420 -999.990 ... AR2 2020 04 16 15 03 35 47.8011 11.0245 941.00 936.00 5.00 473130 HPB 2020 04 06 11 55 00 1411-99 G co CCGG 151.460 -999.990 ... AR2 2020 06 05 11 59 44 47.8011 11.0245 941.00 936.00 5.00 474994 HPB 2020 04 06 11 55 00 716-99 G co CCGG 151.810 -999.990 ... AR2 2020 06 05 11 45 21 47.8011 11.0245 941.00 936.00 5.00 474995 HPB 2020 04 14 11 55 00 1053-99 G co CCGG 140.980 -999.990 ... AR2 2020 06 05 11 16 41 47.8011 11.0245 941.00 936.00 5.00 474996 HPB 2020 04 14 11 55 00 4826-99 G co CCGG 141.060 -999.990 ... AR2 2020 06 05 11 31 01 47.8011 11.0245 941.00 936.00 5.00 474997 HPB 2020 04 20 11 55 00 4016-99 G co CCGG 169.900 -999.990 ... AR2 2020 06 22 15 05 55 47.8011 11.0245 941.00 936.00 5.00 475744 HPB 2020 04 20 11 55 00 425-99 G co CCGG 170.200 -999.990 ... AR2 2020 06 22 14 51 37 47.8011 11.0245 941.00 936.00 5.00 475743 HPB 2020 04 27 11 53 00 1550-99 G co CCGG 133.520 -999.990 ... AR2 2020 06 22 15 20 14 47.8011 11.0245 941.00 936.00 5.00 475745 HPB 2020 04 27 11 53 00 5161-99 G co CCGG 133.390 -999.990 ... AR2 2020 06 22 15 34 33 47.8011 11.0245 941.00 936.00 5.00 475746 HPB 2020 05 04 11 53 00 1945-99 G co CCGG 126.630 -999.990 ... AR2 2020 06 25 16 01 30 47.8011 11.0245 941.00 936.00 5.00 475979 HPB 2020 05 04 11 53 00 580-99 G co CCGG 126.630 -999.990 ... AR2 2020 06 25 15 47 10 47.8011 11.0245 941.00 936.00 5.00 475978 HPB 2020 05 11 11 55 00 5619-99 G co CCGG 157.100 -999.990 ... AR2 2020 07 21 13 47 35 47.8011 11.0245 941.00 936.00 5.00 477162 HPB 2020 05 11 11 55 00 5813-99 G co CCGG 156.800 -999.990 ... AR2 2020 07 21 14 01 58 47.8011 11.0245 941.00 936.00 5.00 477163 HPB 2020 05 18 11 55 00 5814-99 G co CCGG 142.750 -999.990 ... AR2 2020 07 21 14 16 23 47.8011 11.0245 941.00 936.00 5.00 477160 HPB 2020 05 18 11 55 00 5874-99 G co CCGG 141.560 -999.990 ... AR2 2020 07 21 14 30 45 47.8011 11.0245 941.00 936.00 5.00 477161 HPB 2020 05 26 11 55 00 5028-99 G co CCGG 115.350 -999.990 ... AR2 2020 08 14 16 15 26 47.8011 11.0245 941.00 936.00 5.00 478683 HPB 2020 05 26 11 55 00 5587-99 G co CCGG 115.360 -999.990 ... AR2 2020 08 14 16 29 43 47.8011 11.0245 941.00 936.00 5.00 478684 HPB 2020 06 02 11 56 00 170-99 G co CCGG 123.740 -999.990 ... AR2 2020 08 14 12 54 55 47.8011 11.0245 941.00 936.00 5.00 478527 HPB 2020 06 02 11 56 00 5652-99 G co CCGG 123.590 -999.990 ... AR2 2020 08 14 13 09 15 47.8011 11.0245 941.00 936.00 5.00 478528 HPB 2020 06 08 11 52 00 4079-99 G co CCGG 108.600 -999.990 ... AR2 2020 07 29 11 57 04 47.8011 11.0245 941.00 936.00 5.00 477664 HPB 2020 06 08 11 52 00 573-99 G co CCGG 109.360 -999.990 ... AR2 2020 07 29 11 42 42 47.8011 11.0245 941.00 936.00 5.00 477663 HPB 2020 06 15 11 52 00 2359-99 G co CCGG 106.530 -999.990 ... AR2 2020 07 29 12 11 26 47.8011 11.0245 941.00 936.00 5.00 477665 HPB 2020 06 15 11 52 00 5599-99 G co CCGG 105.910 -999.990 ... AR2 2020 07 29 12 25 50 47.8011 11.0245 941.00 936.00 5.00 477666 HPB 2020 06 22 11 53 00 3930-99 G co CCGG 111.760 -999.990 ... AR2 2020 08 10 11 10 36 47.8011 11.0245 941.00 936.00 5.00 478165 HPB 2020 06 22 11 53 00 5168-99 G co CCGG 111.970 -999.990 ... AR2 2020 08 10 11 24 56 47.8011 11.0245 941.00 936.00 5.00 478166 HPB 2020 06 30 11 55 00 3664-99 G co CCGG 106.180 -999.990 ... AR2 2020 08 10 10 56 18 47.8011 11.0245 941.00 936.00 5.00 478167 HPB 2020 06 30 11 55 00 743-99 G co CCGG 106.960 -999.990 ... AR2 2020 08 10 10 41 58 47.8011 11.0245 941.00 936.00 5.00 478168 HPB 2020 07 06 11 55 00 1496-99 G co CCGG 90.970 -999.990 ... AR2 2020 09 25 18 06 48 47.8011 11.0245 941.00 936.00 5.00 480002 HPB 2020 07 06 11 55 00 4742-99 G co CCGG 90.580 -999.990 ... AR2 2020 09 25 18 21 07 47.8011 11.0245 941.00 936.00 5.00 480003 HPB 2020 07 13 11 55 00 2679-99 G co CCGG 99.590 -999.990 ... AR2 2020 09 25 17 38 11 47.8011 11.0245 941.00 936.00 5.00 480004 HPB 2020 07 13 11 55 00 3885-99 G co CCGG 100.410 -999.990 ... AR2 2020 09 25 17 52 26 47.8011 11.0245 941.00 936.00 5.00 480005 HPB 2020 07 20 11 55 00 235-99 G co CCGG 118.330 -999.990 ... AR2 2020 08 25 14 18 31 47.8011 11.0245 941.00 936.00 5.00 479051 HPB 2020 07 20 11 55 00 732-99 G co CCGG 118.740 -999.990 ... AR2 2020 08 25 14 32 48 47.8011 11.0245 941.00 936.00 5.00 479050 HPB 2020 07 27 11 55 00 1245-99 G co CCGG 103.480 -999.990 ... AR2 2020 08 25 13 49 58 47.8011 11.0245 941.00 936.00 5.00 479052 HPB 2020 07 27 11 55 00 2463-99 G co CCGG 103.630 -999.990 ... AR2 2020 08 25 14 04 14 47.8011 11.0245 941.00 936.00 5.00 479053 HPB 2020 08 03 12 55 00 1916-99 G co CCGG 109.540 -999.990 ... AR2 2020 09 10 13 58 12 47.8011 11.0245 941.00 936.00 5.00 479595 HPB 2020 08 03 12 55 00 347-99 G co CCGG 109.530 -999.990 ... AR2 2020 09 10 14 12 34 47.8011 11.0245 941.00 936.00 5.00 479596 HPB 2020 08 10 11 55 00 2904-99 G co CCGG 148.830 -999.990 ... AR2 2020 09 10 14 26 57 47.8011 11.0245 941.00 936.00 5.00 479597 HPB 2020 08 10 11 55 00 5596-99 G co CCGG 149.110 -999.990 ... AR2 2020 09 10 14 41 19 47.8011 11.0245 941.00 936.00 5.00 479598 HPB 2020 08 17 11 55 00 3476-99 G co CCGG 112.850 -999.990 ... AR2 2020 09 28 15 21 59 47.8011 11.0245 941.00 936.00 5.00 480067 HPB 2020 08 17 11 55 00 5228-99 G co CCGG 113.710 -999.990 ... AR2 2020 09 28 15 36 27 47.8011 11.0245 941.00 936.00 5.00 480068 HPB 2020 08 24 11 55 00 2100-99 G co CCGG 106.410 -999.990 ... AR2 2020 09 28 16 05 16 47.8011 11.0245 941.00 936.00 5.00 480066 HPB 2020 08 24 11 55 00 402-99 G co CCGG 106.420 -999.990 ... AR2 2020 09 28 15 50 52 47.8011 11.0245 941.00 936.00 5.00 480065 HPB 2020 08 31 11 55 00 2940-99 G co CCGG 105.400 -999.990 ... AR2 2020 10 13 10 16 26 47.8011 11.0245 941.00 936.00 5.00 480704 HPB 2020 08 31 11 55 00 3952-99 G co CCGG 105.430 -999.990 ... AR2 2020 10 13 10 30 42 47.8011 11.0245 941.00 936.00 5.00 480705 HPB 2020 09 08 11 55 00 1396-99 G co CCGG 117.660 -999.990 ... AR2 2020 10 16 10 49 36 47.8011 11.0245 941.00 936.00 5.00 480696 HPB 2020 09 08 11 55 00 3023-99 G co CCGG 117.390 -999.990 ... AR2 2020 10 16 11 03 52 47.8011 11.0245 941.00 936.00 5.00 480697 HPB 2020 09 15 11 55 00 3258-99 G co CCGG 138.660 -999.990 ... AR2 2020 12 03 14 24 44 47.8011 11.0245 941.00 936.00 5.00 482841 HPB 2020 09 15 11 55 00 836-99 G co CCGG 138.790 -999.990 ... AR2 2020 12 03 14 10 24 47.8011 11.0245 941.00 936.00 5.00 482840 HPB 2020 10 20 11 55 00 22-99 G co CCGG 137.460 -999.990 ... AR2 2020 12 03 14 39 00 47.8011 11.0245 941.00 936.00 5.00 482834 HPB 2020 10 20 11 55 00 3132-99 G co CCGG 137.640 -999.990 ... AR2 2020 12 03 14 53 16 47.8011 11.0245 941.00 936.00 5.00 482835 HPB 2020 10 26 11 55 00 1681-99 G co CCGG 127.930 -999.990 ... AR2 2021 01 14 15 22 42 47.8011 11.0245 941.00 936.00 5.00 484503 HPB 2020 10 26 11 55 00 179-99 G co CCGG 130.310 -999.990 ... AR2 2021 01 14 15 08 27 47.8011 11.0245 941.00 936.00 5.00 484504 HPB 2020 11 02 11 55 00 2227-99 G co CCGG 98.040 -999.990 ... AR2 2021 01 14 15 36 57 47.8011 11.0245 941.00 936.00 5.00 484501 HPB 2020 11 02 11 55 00 3936-99 G co CCGG 97.500 -999.990 ... AR2 2021 01 14 15 51 13 47.8011 11.0245 941.00 936.00 5.00 484502 HPB 2020 11 09 11 55 00 4009-99 G co CCGG 136.530 -999.990 ... AR2 2021 03 04 10 43 33 47.8011 11.0245 941.00 936.00 5.00 486326 HPB 2020 11 09 11 55 00 4708-99 G co CCGG 133.950 -999.990 ... AR2 2021 03 04 10 57 49 47.8011 11.0245 941.00 936.00 5.00 486327 HPB 2020 11 16 11 55 00 5819-99 G co CCGG 126.210 -999.990 ... AR2 2021 03 04 11 12 05 47.8011 11.0245 941.00 936.00 5.00 486328 HPB 2020 11 16 11 55 00 5906-99 G co CCGG 126.140 -999.990 ... AR2 2021 03 04 11 26 25 47.8011 11.0245 941.00 936.00 5.00 486329 HPB 2020 11 30 11 55 00 2346-99 G co CCGG 190.480 -999.990 ... AR2 2021 03 23 15 03 01 47.8011 11.0245 941.00 936.00 5.00 486825 HPB 2020 11 30 11 55 00 4054-99 G co CCGG 189.350 -999.990 ... AR2 2021 03 23 15 17 20 47.8011 11.0245 941.00 936.00 5.00 486826 HPB 2020 12 07 11 55 00 2500-99 G co CCGG 144.190 -999.990 ... AR2 2021 03 23 14 34 31 47.8011 11.0245 941.00 936.00 5.00 486827 HPB 2020 12 07 11 55 00 3919-99 G co CCGG 142.920 -999.990 ... AR2 2021 03 23 14 48 46 47.8011 11.0245 941.00 936.00 5.00 486828 HPB 2020 12 15 11 55 00 1074-99 G co CCGG 118.880 -999.990 ... AR2 2021 02 18 12 12 27 47.8011 11.0245 941.00 936.00 5.00 485255 HPB 2020 12 15 11 55 00 5233-99 G co CCGG 121.090 -999.990 ... AR2 2021 02 18 12 26 43 47.8011 11.0245 941.00 936.00 5.00 485256 HPB 2020 12 22 11 55 00 3292-99 G co CCGG 102.090 -999.990 ... AR2 2021 02 18 11 43 51 47.8011 11.0245 941.00 936.00 5.00 485257 HPB 2020 12 22 11 55 00 5871-99 G co CCGG 101.740 -999.990 ... AR2 2021 02 18 11 58 11 47.8011 11.0245 941.00 936.00 5.00 485258 HPB 2020 12 28 11 55 00 1363-99 G co CCGG 149.890 -999.990 ... AR2 2021 03 22 16 50 51 47.8011 11.0245 941.00 936.00 5.00 486975 HPB 2020 12 28 11 55 00 3322-99 G co CCGG 150.140 -999.990 ... AR2 2021 03 22 17 05 06 47.8011 11.0245 941.00 936.00 5.00 486976