# number_of_header_lines: 71 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO CCGG (Individual Flasks) # contact_name: Gabrielle Petron # contact_telephone: (303) 497-4890 # contact_email: Gabrielle.Petron@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: NOAA Earth System Research Laboratory, Global # collaborator_name: Monitoring Division [NOAA ESRL GMD] # collaborator_url: http://www.esrl.noaa.gov/gmd # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: mlo # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2020-12-31 # description_creation-time: 2021-07-29 08:18:34 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number MLO 1989 07 07 20 09 00 2225-62 P co CCGG 79.060 -999.990 ... R2 1989 07 19 09 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 82092 MLO 1989 07 14 19 52 00 2269-62 P co CCGG 59.940 -999.990 ... R2 1989 07 19 10 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 82100 MLO 1989 07 21 20 55 00 2009-62 P co CCGG 63.600 -999.990 ... R2 1989 08 02 07 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 82108 MLO 1989 07 27 20 45 00 2021-64 P co CCGG 104.390 -999.990 ... R2 1989 08 02 07 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 82116 MLO 1989 08 04 20 32 00 2011-66 P co CCGG 71.580 -999.990 ... R2 1989 08 06 08 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 82122 MLO 1989 08 04 20 32 00 2011-66 P co CCGG 71.590 -999.990 ... R2 1989 08 06 08 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 82122 MLO 1989 08 11 20 08 00 2017-64 P co CCGG 60.440 -999.990 ... R2 1989 08 16 08 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 82132 MLO 1989 08 11 20 08 00 2017-64 P co CCGG 59.150 -999.990 ... R2 1989 08 16 08 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 82132 MLO 1989 08 18 20 07 00 2023-64 P co CCGG 79.650 -999.990 ... R2 1989 08 23 16 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 82140 MLO 1989 08 25 20 10 00 2115-62 P co CCGG -999.990 -999.990 *.. R2 1989 09 06 09 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 82146 MLO 1989 09 01 19 51 00 2229-62 P co CCGG 95.510 -999.990 ... R2 1989 09 18 10 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 82156 MLO 1989 09 01 19 51 00 2229-62 P co CCGG 95.020 -999.990 ... R2 1989 09 18 10 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 82156 MLO 1989 09 08 20 10 00 2043-62 P co CCGG 88.930 -999.990 ... R2 1989 09 18 09 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 82162 MLO 1989 09 08 20 10 00 2043-62 P co CCGG 89.050 -999.990 ... R2 1989 09 18 09 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 82162 MLO 1989 09 15 19 39 00 2187-62 P co CCGG 85.480 -999.990 ... R2 1989 09 25 08 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 82170 MLO 1989 09 22 19 54 00 2043-64 P co CCGG 84.860 -999.990 ... R2 1989 10 05 07 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 82180 MLO 1989 09 29 19 50 00 2003-66 P co CCGG 83.980 -999.990 ... R2 1989 10 05 07 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 82186 MLO 1989 09 29 19 50 00 2003-66 P co CCGG 82.790 -999.990 ... R2 1989 10 05 07 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 82186 MLO 1989 10 13 20 04 00 2005-66 P co CCGG 79.470 -999.990 ... R2 1989 10 23 08 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 82194 MLO 1989 10 20 19 59 00 2011-64 P co CCGG 70.040 -999.990 Z.. R2 1989 10 26 07 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 82203 MLO 1989 10 20 19 59 00 2011-64 P co CCGG 66.700 -999.990 Z.. R2 1989 10 26 08 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 82203 MLO 1989 10 27 19 51 00 2115-62 P co CCGG 88.960 -999.990 ... R2 1989 11 07 11 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 82211 MLO 1989 10 27 19 51 00 2115-62 P co CCGG 87.910 -999.990 ... R2 1989 11 07 12 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 82211 MLO 1989 11 03 19 53 00 2047-62 P co CCGG 74.930 -999.990 ... R2 1989 11 07 11 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 82221 MLO 1989 11 03 19 53 00 2047-62 P co CCGG 75.010 -999.990 ... R2 1989 11 07 11 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 82221 MLO 1989 11 03 19 53 00 2047-62 P co CCGG 77.940 -999.990 ... R2 1989 11 07 11 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 82221 MLO 1989 11 09 20 06 00 2021-66 P co CCGG 88.140 -999.990 ... R2 1989 11 27 09 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 82229 MLO 1989 11 09 20 06 00 2021-66 P co CCGG 88.650 -999.990 ... R2 1989 11 27 09 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 82229 MLO 1989 11 17 19 54 00 2007-66 P co CCGG 91.190 -999.990 ... R2 1989 11 27 09 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 82235 MLO 1989 11 17 19 54 00 2007-66 P co CCGG 90.400 -999.990 ... R2 1989 11 27 09 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 82235 MLO 1989 12 01 19 57 00 2043-64 P co CCGG 115.080 -999.990 ... R2 1989 12 11 10 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 82245 MLO 1989 12 08 19 43 00 2005-62 P co CCGG 92.500 -999.990 ... R2 1989 12 19 12 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 82251 MLO 1989 12 08 19 43 00 2005-62 P co CCGG 92.820 -999.990 ... R2 1989 12 19 12 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 82251 MLO 1989 12 15 19 47 00 2025-66 P co CCGG 96.490 -999.990 ... R2 1989 12 22 09 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 82259 MLO 1989 12 22 21 42 00 2133-62 P co CCGG 90.390 -999.990 ... R2 1990 01 03 11 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 82269 MLO 1989 12 22 21 42 00 2133-62 P co CCGG 90.580 -999.990 ... R2 1990 01 03 11 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 82269 MLO 1989 12 29 20 29 00 2009-66 P co CCGG 98.780 -999.990 ... R2 1990 01 03 09 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 82275 MLO 1989 12 29 20 29 00 2009-66 P co CCGG 98.120 -999.990 ... R2 1990 01 03 09 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 82275 MLO 1990 01 05 19 56 00 2291-62 P co CCGG 131.320 -999.990 ... R2 1990 01 10 10 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 82283 MLO 1990 01 12 20 16 00 2225-62 P co CCGG 103.090 -999.990 ... R2 1990 01 17 09 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 82289 MLO 1990 01 12 20 16 00 2225-62 P co CCGG 103.680 -999.990 ... R2 1990 01 17 09 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 82289 MLO 1990 01 26 19 58 00 2269-62 P co CCGG 95.230 -999.990 ... R2 1990 01 30 09 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 82299 MLO 1990 01 26 19 58 00 2269-62 P co CCGG 96.400 -999.990 ... R2 1990 01 30 09 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 82299 MLO 1990 02 02 19 58 00 2023-66 P co CCGG 106.650 -999.990 R.. R2 1990 02 13 08 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 82309 MLO 1990 02 02 19 58 00 2023-66 P co CCGG 107.450 -999.990 R.. R2 1990 02 13 08 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 82309 MLO 1990 02 09 19 58 00 2035-66 P co CCGG 150.800 -999.990 Z.. R2 1990 02 16 09 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 82317 MLO 1990 02 09 19 58 00 2035-66 P co CCGG 154.800 -999.990 Z.. R2 1990 02 16 09 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 82317 MLO 1990 02 16 20 10 00 2003-66 P co CCGG 153.180 -999.990 .X. R2 1990 02 22 10 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 82325 MLO 1990 02 16 20 10 00 2003-66 P co CCGG 152.440 -999.990 .X. R2 1990 02 22 10 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 82325 MLO 1990 02 23 19 48 00 2291-62 P co CCGG 100.620 -999.990 Z.. R2 1990 02 27 10 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 82331 MLO 1990 02 23 19 48 00 2291-62 P co CCGG 104.360 -999.990 Z.. R2 1990 02 27 10 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 82331 MLO 1990 03 09 21 16 00 2047-62 P co CCGG 99.340 -999.990 ... R2 1990 03 23 09 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 82337 MLO 1990 03 09 21 16 00 2047-62 P co CCGG 100.150 -999.990 ... R2 1990 03 23 09 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 82337 MLO 1990 03 16 19 34 00 2057-66 P co CCGG 147.070 -999.990 ... R2 1990 03 23 09 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 82343 MLO 1990 03 23 19 32 00 2041-66 P co CCGG 100.410 -999.990 R.. R2 1990 03 27 08 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 82349 MLO 1990 03 23 19 32 00 2041-66 P co CCGG 101.790 -999.990 R.. R2 1990 03 27 08 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 82349 MLO 1990 03 30 19 41 00 2033-62 P co CCGG 148.360 -999.990 ... R2 1990 04 04 07 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 82355 MLO 1990 04 06 19 25 00 2047-66 P co CCGG 154.130 -999.990 ... R2 1990 04 11 09 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 82361 MLO 1990 04 13 19 26 00 2081-66 P co CCGG 113.150 -999.990 ... R2 1990 04 20 09 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 82367 MLO 1990 04 20 19 30 00 2089-66 P co CCGG 120.530 -999.990 ... R2 1990 04 27 10 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 82373 MLO 1990 04 27 19 30 00 2115-66 P co CCGG 125.070 -999.990 ... R2 1990 05 01 10 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 82379 MLO 1990 05 04 19 51 00 2121-66 P co CCGG 141.060 -999.990 ... R2 1990 05 09 11 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 82385 MLO 1990 05 04 19 51 00 2121-66 P co CCGG 142.470 -999.990 ... R2 1990 05 09 11 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 82385 MLO 1990 05 11 19 33 00 2015-66 P co CCGG 105.540 -999.990 ... R2 1990 05 27 10 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 82391 MLO 1990 05 18 19 33 00 2143-66 P co CCGG 123.930 -999.990 ... R2 1990 05 27 10 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 82397 MLO 1990 05 25 19 47 00 2033-66 P co CCGG 123.960 -999.990 ... R2 1990 06 07 08 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 82401 MLO 1990 06 01 19 33 00 2065-66 P co CCGG 89.180 -999.990 ... R2 1990 06 07 08 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 82409 MLO 1990 06 08 19 25 00 2075-66 P co CCGG 99.090 -999.990 ... R2 1990 06 07 04 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 82415 MLO 1990 06 08 19 25 00 2075-66 P co CCGG 98.110 -999.990 ... R2 1990 06 07 04 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 82415 MLO 1990 06 15 19 42 00 2059-66 P co CCGG 92.730 -999.990 ... R2 1990 06 26 09 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 82421 MLO 1990 06 15 19 42 00 2059-66 P co CCGG 93.880 -999.990 ... R2 1990 06 26 09 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 82421 MLO 1990 06 22 19 40 00 2023-66 P co CCGG 83.950 -999.990 ... R2 1990 06 29 11 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 82427 MLO 1990 06 22 19 40 00 2023-66 P co CCGG 84.870 -999.990 ... R2 1990 06 29 11 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 82427 MLO 1990 06 29 19 35 00 2083-66 P co CCGG 81.020 -999.990 ... R2 1990 07 24 07 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 82433 MLO 1990 07 06 19 40 00 2159-66 P co CCGG 77.110 -999.990 ... R2 1990 07 23 11 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 82439 MLO 1990 07 13 20 04 00 2173-66 P co CCGG 75.170 -999.990 ... R2 1990 07 23 09 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 82445 MLO 1990 07 27 19 34 00 2025-66 P co CCGG 75.020 -999.990 ... R2 1990 08 02 07 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 82451 MLO 1990 07 27 19 34 00 2025-66 P co CCGG 75.890 -999.990 ... R2 1990 08 02 08 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 82451 MLO 1990 08 03 19 40 00 2147-66 P co CCGG 67.670 -999.990 ... R2 1990 08 08 07 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 82457 MLO 1990 08 03 19 40 00 2147-66 P co CCGG 68.010 -999.990 ... R2 1990 08 08 07 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 82457 MLO 1990 08 10 19 37 00 2055-66 P co CCGG 75.930 -999.990 Z.. R2 1990 08 15 11 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 82463 MLO 1990 08 10 19 37 00 2055-66 P co CCGG 78.950 -999.990 Z.. R2 1990 08 15 11 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 82463 MLO 1990 08 17 19 33 00 2085-66 P co CCGG 71.090 -999.990 Z.. R2 1990 08 24 08 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 82469 MLO 1990 08 17 19 33 00 2085-66 P co CCGG 67.990 -999.990 Z.. R2 1990 08 24 08 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 82469 MLO 1990 08 24 19 41 00 2077-66 P co CCGG 74.050 -999.990 R.. R2 1990 08 31 08 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 82475 MLO 1990 08 24 19 41 00 2077-66 P co CCGG 76.590 -999.990 R.. R2 1990 08 31 08 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 82475 MLO 1990 08 24 19 41 00 2077-66 P co CCGG 76.870 -999.990 R.. R2 1990 08 31 08 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 82475 MLO 1990 08 31 19 27 00 2057-66 P co CCGG 80.070 -999.990 ... R2 1990 09 05 10 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 82481 MLO 1990 09 07 19 32 00 2207-66 P co CCGG 99.530 -999.990 ... R2 1990 09 14 22 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 82487 MLO 1990 09 14 19 35 00 2159-66 P co CCGG 70.410 -999.990 ... R2 1990 10 01 12 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 82493 MLO 1990 09 21 19 47 00 2121-66 P co CCGG 70.900 -999.990 ... R2 1990 10 01 10 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 82499 MLO 1990 09 21 19 47 00 2121-66 P co CCGG 70.540 -999.990 ... R2 1990 10 01 10 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 82499 MLO 1990 09 28 19 47 00 2227-66 P co CCGG 106.700 -999.990 ... R2 1990 10 01 12 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 82505 MLO 1990 09 28 19 47 00 2227-66 P co CCGG 109.420 -999.990 ... R2 1990 10 01 12 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 82505 MLO 1990 10 05 19 41 00 2119-66 P co CCGG 83.210 -999.990 Z.. R2 1990 10 12 08 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 82511 MLO 1990 10 05 19 41 00 2119-66 P co CCGG 79.670 -999.990 Z.. R2 1990 10 12 08 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 82511 MLO 1990 10 12 20 01 00 2065-66 P co CCGG 84.980 -999.990 ... R2 1990 10 26 15 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 82517 MLO 1990 10 19 19 29 00 2183-66 P co CCGG 78.140 -999.990 ... R2 1990 10 26 14 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 82523 MLO 1990 10 26 20 31 00 2041-66 P co CCGG 86.360 -999.990 ... R2 1990 11 01 10 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 82531 MLO 1990 10 26 20 31 00 2041-66 P co CCGG 87.500 -999.990 ... R2 1990 11 01 10 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 82531 MLO 1990 11 02 20 16 00 2133-66 P co CCGG 72.220 -999.990 Z.. R2 1990 11 28 11 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 82535 MLO 1990 11 02 20 16 00 2133-66 P co CCGG 76.880 -999.990 Z.. R2 1990 11 28 11 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 82535 MLO 1990 11 02 20 16 00 2134-66 P co CCGG 79.360 -999.990 ... R4 1990 11 28 15 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 82536 MLO 1990 11 02 20 16 00 2134-66 P co CCGG 79.550 -999.990 ... R4 1990 11 28 15 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 82536 MLO 1990 11 09 19 52 00 2143-66 P co CCGG 95.480 -999.990 ... R2 1990 11 14 10 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 82541 MLO 1990 11 09 19 52 00 2143-66 P co CCGG 96.930 -999.990 ... R2 1990 11 14 10 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 82541 MLO 1990 11 16 19 43 00 2053-66 P co CCGG 95.330 -999.990 ... R2 1990 11 28 11 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 82547 MLO 1990 11 16 19 43 00 2053-66 P co CCGG 94.380 -999.990 ... R2 1990 11 28 11 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 82547 MLO 1990 11 16 19 43 00 2053-66 P co CCGG 99.490 -999.990 Z.. R2 1990 11 28 12 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 82547 MLO 1990 11 16 19 43 00 2054-66 P co CCGG 103.790 -999.990 ... R4 1990 11 28 17 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 82548 MLO 1990 11 16 19 43 00 2054-66 P co CCGG 103.270 -999.990 ... R4 1990 11 28 17 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 82548 MLO 1990 11 30 19 32 00 2135-66 P co CCGG 88.750 -999.990 ... R4 1990 12 20 13 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 82553 MLO 1990 11 30 19 32 00 2135-66 P co CCGG 87.350 -999.990 ... R4 1990 12 20 14 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 82553 MLO 1990 12 07 19 54 00 2160-66 P co CCGG 103.190 -999.990 ... R4 1990 12 21 11 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 82560 MLO 1990 12 07 19 54 00 2160-66 P co CCGG 102.650 -999.990 ... R4 1990 12 21 11 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 82560 MLO 1990 12 14 19 34 00 2156-66 P co CCGG 123.630 -999.990 ... R4 1990 12 27 10 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 82566 MLO 1990 12 14 19 34 00 2156-66 P co CCGG 124.300 -999.990 ... R4 1990 12 27 10 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 82566 MLO 1990 12 28 19 49 00 2002-66 P co CCGG 144.040 -999.990 .X. R4 1991 01 08 11 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 82572 MLO 1990 12 28 19 49 00 2002-66 P co CCGG 143.980 -999.990 .X. R4 1991 01 08 11 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 82572 MLO 1991 01 04 19 54 00 2196-66 P co CCGG 86.110 -999.990 ... R4 1991 01 11 10 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 82578 MLO 1991 01 04 19 54 00 2196-66 P co CCGG 86.990 -999.990 ... R4 1991 01 11 10 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 82578 MLO 1991 01 11 19 37 00 2064-66 P co CCGG 110.530 -999.990 ... R4 1991 01 15 16 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 82584 MLO 1991 01 11 19 37 00 2064-66 P co CCGG 112.390 -999.990 ... R4 1991 01 15 17 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 82584 MLO 1991 01 11 20 45 00 2241-66 P co CCGG 79.230 -999.990 ... R4 1991 01 18 08 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 82587 MLO 1991 01 11 20 45 00 2241-66 P co CCGG 77.720 -999.990 ... R4 1991 01 18 09 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 82587 MLO 1991 01 18 19 24 00 2130-66 P co CCGG 97.740 -999.990 ... R4 1991 01 24 14 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 82594 MLO 1991 01 18 19 24 00 2130-66 P co CCGG 98.030 -999.990 ... R4 1991 01 24 14 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 82594 MLO 1991 01 25 19 35 00 2214-66 P co CCGG 86.420 -999.990 ... R4 1991 02 01 13 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 82600 MLO 1991 01 25 19 35 00 2214-66 P co CCGG 88.100 -999.990 ... R4 1991 02 01 13 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 82600 MLO 1991 02 01 19 45 00 2126-66 P co CCGG 102.590 -999.990 ... R4 1991 02 07 12 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 82606 MLO 1991 02 01 19 45 00 2126-66 P co CCGG 101.010 -999.990 ... R4 1991 02 07 12 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 82606 MLO 1991 02 08 19 22 00 2174-66 P co CCGG 107.600 -999.990 ... R4 1991 02 14 10 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 82612 MLO 1991 02 08 19 22 00 2174-66 P co CCGG 108.260 -999.990 ... R4 1991 02 14 10 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 82612 MLO 1991 02 15 19 26 00 2160-66 P co CCGG 128.850 -999.990 ... R4 1991 02 21 09 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 82618 MLO 1991 02 15 19 26 00 2160-66 P co CCGG 128.620 -999.990 ... R4 1991 02 21 10 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 82618 MLO 1991 02 22 19 29 00 2122-66 P co CCGG 123.110 -999.990 ... R4 1991 03 11 19 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 82624 MLO 1991 02 22 19 29 00 2122-66 P co CCGG 121.680 -999.990 ... R4 1991 03 11 20 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 82624 MLO 1991 03 01 19 37 00 2026-66 P co CCGG 93.550 -999.990 ... R4 1991 03 12 11 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 82630 MLO 1991 03 01 19 37 00 2026-66 P co CCGG 91.290 -999.990 ... R4 1991 03 12 12 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 82630 MLO 1991 03 08 19 33 00 2070-66 P co CCGG 138.730 -999.990 ... R4 1991 03 25 13 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 82636 MLO 1991 03 08 19 33 00 2070-66 P co CCGG 140.720 -999.990 ... R4 1991 03 25 13 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 82636 MLO 1991 03 15 19 27 00 2088-66 P co CCGG 145.380 -999.990 ... R4 1991 03 21 10 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 82642 MLO 1991 03 15 19 27 00 2088-66 P co CCGG 145.010 -999.990 ... R4 1991 03 21 11 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 82642 MLO 1991 03 22 19 36 00 2038-66 P co CCGG 126.920 -999.990 ... R4 1991 03 28 09 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 82648 MLO 1991 03 22 19 36 00 2038-66 P co CCGG 125.480 -999.990 ... R4 1991 03 28 10 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 82648 MLO 1991 03 29 19 19 00 2082-66 P co CCGG 155.120 -999.990 ... R4 1991 04 03 09 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 82654 MLO 1991 03 29 19 19 00 2082-66 P co CCGG 157.960 -999.990 ... R4 1991 04 03 10 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 82654 MLO 1991 04 05 19 42 00 2162-66 P co CCGG 145.300 -999.990 ... R4 1991 04 10 09 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 82660 MLO 1991 04 05 19 42 00 2162-66 P co CCGG 144.360 -999.990 ... R4 1991 04 10 10 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 82660 MLO 1991 04 12 19 32 00 2196-66 P co CCGG 105.120 -999.990 ... R4 1991 04 17 13 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 82666 MLO 1991 04 12 19 32 00 2196-66 P co CCGG 104.380 -999.990 ... R4 1991 04 17 13 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 82666 MLO 1991 04 19 19 26 00 2080-66 P co CCGG 182.940 -999.990 Z.. R4 1991 04 26 10 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 82672 MLO 1991 04 19 19 26 00 2080-66 P co CCGG 178.390 -999.990 Z.. R4 1991 04 26 10 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 82672 MLO 1991 04 26 19 35 00 2284-66 P co CCGG 127.900 -999.990 ... R4 1991 05 03 11 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 82678 MLO 1991 04 26 19 35 00 2284-66 P co CCGG 128.430 -999.990 ... R4 1991 05 03 11 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 82678 MLO 1991 05 03 19 40 00 2258-66 P co CCGG 142.260 -999.990 ... R4 1991 05 10 10 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 82684 MLO 1991 05 03 19 40 00 2258-66 P co CCGG 140.070 -999.990 ... R4 1991 05 10 10 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 82684 MLO 1991 05 10 19 32 00 2012-66 P co CCGG 122.300 -999.990 ... R4 1991 05 17 15 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 82690 MLO 1991 05 10 19 32 00 2012-66 P co CCGG 120.940 -999.990 ... R4 1991 05 17 16 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 82690 MLO 1991 05 17 19 24 00 2096-66 P co CCGG 137.130 -999.990 ... R4 1991 05 23 08 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 82696 MLO 1991 05 17 19 24 00 2096-66 P co CCGG 135.180 -999.990 ... R4 1991 05 23 09 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 82696 MLO 1991 05 24 19 32 00 2002-66 P co CCGG 129.660 -999.990 ... R4 1991 05 30 20 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 82702 MLO 1991 05 24 19 32 00 2002-66 P co CCGG 130.950 -999.990 ... R4 1991 05 30 20 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 82702 MLO 1991 05 31 19 34 00 2304-66 P co CCGG 122.650 -999.990 ... R4 1991 06 07 09 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 82708 MLO 1991 05 31 19 34 00 2304-66 P co CCGG 122.200 -999.990 ... R4 1991 06 07 09 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 82708 MLO 1991 06 07 19 53 00 2114-66 P co CCGG 88.020 -999.990 ... R4 1991 06 19 10 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 82714 MLO 1991 06 07 19 53 00 2114-66 P co CCGG 88.690 -999.990 ... R4 1991 06 19 10 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 82714 MLO 1991 06 14 19 47 00 2076-66 P co CCGG 86.230 -999.990 ... R4 1991 06 21 10 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 82720 MLO 1991 06 14 19 47 00 2076-66 P co CCGG 85.870 -999.990 ... R4 1991 06 21 11 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 82720 MLO 1991 06 21 19 12 00 2296-66 P co CCGG 85.450 -999.990 ... R4 1991 07 02 11 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 82726 MLO 1991 06 21 19 12 00 2296-66 P co CCGG 84.490 -999.990 ... R4 1991 07 02 11 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 82726 MLO 1991 06 28 20 29 00 2174-66 P co CCGG 86.970 -999.990 ... R4 1991 07 15 11 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 82732 MLO 1991 06 28 20 29 00 2174-66 P co CCGG 86.260 -999.990 ... R4 1991 07 15 11 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 82732 MLO 1991 07 05 19 39 00 2192-66 P co CCGG 83.680 -999.990 ... R4 1991 07 15 11 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 82737 MLO 1991 07 05 19 39 00 2192-66 P co CCGG 83.710 -999.990 ... R4 1991 07 15 11 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 82737 MLO 1991 07 12 20 03 00 2024-66 P co CCGG 82.030 -999.990 ... R4 1991 07 23 15 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 82743 MLO 1991 07 12 20 03 00 2024-66 P co CCGG 82.850 -999.990 ... R4 1991 07 23 15 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 82743 MLO 1991 07 19 19 36 00 2267-66 P co CCGG 88.110 -999.990 ... R4 1991 07 23 11 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 82748 MLO 1991 07 19 19 36 00 2267-66 P co CCGG 87.080 -999.990 ... R4 1991 07 23 11 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 82748 MLO 1991 07 19 19 36 00 2267-66 P co CCGG 87.590 -999.990 ... R4 1991 07 23 11 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 82748 MLO 1991 07 26 19 50 00 2254-66 P co CCGG 84.400 -999.990 ... R4 1991 08 02 15 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 82754 MLO 1991 07 26 19 50 00 2254-66 P co CCGG 85.020 -999.990 ... R4 1991 08 02 15 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 82754 MLO 1991 08 02 19 49 00 706-81 P co CCGG 92.850 -999.990 W.. R4 1991 08 07 18 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 82760 MLO 1991 08 02 19 49 00 706-81 P co CCGG 91.960 -999.990 W.. R4 1991 08 07 19 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 82760 MLO 1991 08 16 19 18 00 2160-66 S co CCGG 67.040 -999.990 S.. R4 1991 08 26 18 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 82770 MLO 1991 08 16 19 18 00 2160-66 S co CCGG 67.300 -999.990 S.. R4 1991 08 26 18 35 00 19.5300 -155.5800 3437.00 3397.00 40.00 82770 MLO 1991 08 16 19 25 00 2094-66 P co CCGG 70.670 -999.990 ... R4 1991 08 26 17 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 82772 MLO 1991 08 16 19 25 00 2094-66 P co CCGG 69.900 -999.990 ... R4 1991 08 26 18 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 82772 MLO 1991 08 23 19 20 00 2354-66 P co CCGG 76.840 -999.990 ... R4 1991 09 03 10 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 82778 MLO 1991 08 23 19 20 00 2354-66 P co CCGG 76.720 -999.990 ... R4 1991 09 03 10 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 82778 MLO 1991 08 30 19 18 00 2084-66 P co CCGG 69.140 -999.990 ... R4 1991 09 09 15 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 82782 MLO 1991 08 30 19 18 00 2084-66 P co CCGG 69.890 -999.990 ... R4 1991 09 09 16 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 82782 MLO 1991 09 06 20 33 00 2316-66 P co CCGG 71.510 -999.990 ... R4 1991 09 12 17 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 82790 MLO 1991 09 06 20 33 00 2316-66 P co CCGG 70.840 -999.990 ... R4 1991 09 12 17 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 82790 MLO 1991 09 13 19 27 00 2160-66 P co CCGG 81.920 -999.990 ... R4 1991 09 19 11 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 82796 MLO 1991 09 13 19 27 00 2160-66 P co CCGG 81.910 -999.990 ... R4 1991 09 19 11 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 82796 MLO 1991 09 20 19 41 00 2300-66 P co CCGG 91.330 -999.990 ... R4 1991 09 26 09 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 82802 MLO 1991 09 20 19 41 00 2300-66 P co CCGG 89.720 -999.990 ... R4 1991 09 26 09 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 82802 MLO 1991 09 27 19 30 00 2082-66 P co CCGG 83.810 -999.990 ... R4 1991 10 03 10 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 82808 MLO 1991 09 27 19 30 00 2082-66 P co CCGG 82.760 -999.990 ... R4 1991 10 03 11 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 82808 MLO 1991 10 04 19 51 00 2345-66 P co CCGG 98.400 -999.990 ... R4 1991 10 09 11 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 82813 MLO 1991 10 04 19 51 00 2346-66 P co CCGG 98.690 -999.990 ... R4 1991 10 09 11 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 82814 MLO 1991 10 11 19 40 00 2067-66 P co CCGG 91.860 -999.990 ... R4 1991 10 21 08 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 82819 MLO 1991 10 11 19 40 00 2068-66 P co CCGG 92.060 -999.990 ... R4 1991 10 21 08 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 82820 MLO 1991 10 18 19 54 00 2101-66 P co CCGG 90.750 -999.990 ... R4 1991 10 24 12 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 82827 MLO 1991 10 18 19 54 00 2102-66 P co CCGG 91.610 -999.990 ... R4 1991 10 24 13 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 82828 MLO 1991 10 25 19 53 00 2339-66 P co CCGG 96.090 -999.990 ... R4 1991 10 31 13 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 82833 MLO 1991 10 25 19 53 00 2340-66 P co CCGG 96.400 -999.990 ... R4 1991 10 31 14 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 82834 MLO 1991 11 01 20 08 00 2059-66 P co CCGG 108.970 -999.990 ... R4 1991 11 06 15 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 82837 MLO 1991 11 01 20 08 00 2060-66 P co CCGG 110.460 -999.990 ... R4 1991 11 06 15 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 82838 MLO 1991 11 08 19 25 00 2225-66 P co CCGG 107.060 -999.990 P.. R4 1991 11 15 09 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 82843 MLO 1991 11 08 19 25 00 2226-66 P co CCGG 110.280 -999.990 P.. R4 1991 11 15 10 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 82844 MLO 1991 11 15 19 37 00 2298-66 P co CCGG 105.180 -999.990 ... R4 1991 12 05 08 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 82850 MLO 1991 11 22 19 28 00 2305-66 P co CCGG 88.910 -999.990 ... R4 1991 12 05 12 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 82855 MLO 1991 11 22 19 28 00 2306-66 P co CCGG 88.630 -999.990 ... R4 1991 12 05 12 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 82856 MLO 1991 11 29 19 22 00 2109-66 P co CCGG 96.620 -999.990 ... R4 1991 12 09 09 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 82861 MLO 1991 11 29 19 22 00 2110-66 P co CCGG -999.990 -999.990 *.. R4 1991 12 09 09 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 82862 MLO 1991 12 06 19 45 00 2067-66 P co CCGG 107.860 -999.990 ... R4 1991 12 16 12 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 82867 MLO 1991 12 06 19 45 00 2068-66 P co CCGG 108.040 -999.990 ... R4 1991 12 16 12 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 82868 MLO 1991 12 13 19 44 00 2071-66 P co CCGG 90.510 -999.990 ... R4 1991 12 19 09 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 82873 MLO 1991 12 13 19 44 00 2072-66 P co CCGG 90.010 -999.990 ... R4 1991 12 19 09 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 82874 MLO 1991 12 20 20 32 00 2113-66 P co CCGG 111.990 -999.990 ... R4 1991 12 30 09 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 82879 MLO 1991 12 20 20 32 00 2114-66 P co CCGG 110.780 -999.990 ... R4 1991 12 30 09 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 82880 MLO 1991 12 27 19 40 00 2103-66 P co CCGG 150.580 -999.990 .X. R4 1992 01 10 12 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 82883 MLO 1991 12 27 19 40 00 2104-66 P co CCGG 150.310 -999.990 .X. R4 1992 01 10 12 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 82884 MLO 1991 12 31 19 51 00 2155-66 P co CCGG 139.220 -999.990 ... R4 1992 01 10 13 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 82891 MLO 1991 12 31 19 51 00 2156-66 P co CCGG 141.310 -999.990 ... R4 1992 01 10 13 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 82892 MLO 1992 01 10 19 27 00 2229-66 P co CCGG 116.970 -999.990 ... R4 1992 01 30 08 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 82897 MLO 1992 01 10 19 27 00 2230-66 P co CCGG 116.100 -999.990 ... R4 1992 01 30 09 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 82898 MLO 1992 01 17 19 10 00 2255-66 P co CCGG 119.680 -999.990 ... R4 1992 01 31 11 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 82901 MLO 1992 01 17 19 10 00 2256-66 P co CCGG 120.440 -999.990 ... R4 1992 01 31 12 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 82902 MLO 1992 01 24 20 26 00 2285-66 P co CCGG 127.740 -999.990 ... R4 1992 01 31 08 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 82909 MLO 1992 01 24 20 26 00 2286-66 P co CCGG 127.650 -999.990 ... R4 1992 01 31 08 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 82910 MLO 1992 01 31 19 49 00 2167-66 P co CCGG 111.810 -999.990 ... R4 1992 02 07 10 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 82915 MLO 1992 01 31 19 49 00 2168-66 P co CCGG 112.040 -999.990 ... R4 1992 02 07 10 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 82916 MLO 1992 02 07 19 24 00 2169-66 P co CCGG 118.190 -999.990 ... R4 1992 02 12 14 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 82921 MLO 1992 02 07 19 24 00 2170-66 P co CCGG 117.700 -999.990 ... R4 1992 02 12 14 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 82922 MLO 1992 02 14 19 40 00 2291-66 P co CCGG 140.640 -999.990 ... R4 1992 02 26 12 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 82927 MLO 1992 02 14 19 40 00 2292-66 P co CCGG 141.100 -999.990 ... R4 1992 02 26 13 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 82928 MLO 1992 02 21 19 57 00 2131-66 P co CCGG 120.620 -999.990 ... R4 1992 03 27 08 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 82931 MLO 1992 02 21 19 57 00 2132-66 P co CCGG 123.390 -999.990 ... R4 1992 03 27 08 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 82932 MLO 1992 02 28 19 20 00 1296-81 S co CCGG 265.190 -999.990 W.C R4 1992 03 11 10 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 82938 MLO 1992 02 28 19 35 00 2135-66 P co CCGG 106.480 -999.990 ... R4 1992 03 11 11 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 82939 MLO 1992 02 28 19 35 00 2136-66 P co CCGG 106.930 -999.990 ... R4 1992 03 11 11 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 82940 MLO 1992 03 06 19 14 00 2087-66 P co CCGG 127.400 -999.990 ... R4 1992 03 31 10 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 82945 MLO 1992 03 06 19 14 00 2087-66 P co CCGG 127.560 -999.990 ... R4 1992 04 01 10 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 82945 MLO 1992 03 06 19 14 00 2088-66 P co CCGG 126.810 -999.990 ... R4 1992 03 31 11 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 82946 MLO 1992 03 06 19 14 00 2088-66 P co CCGG 126.610 -999.990 ... R4 1992 04 01 11 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 82946 MLO 1992 03 13 19 40 00 2247-66 P co CCGG 149.090 -999.990 ... R4 1992 04 07 15 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 82951 MLO 1992 03 13 19 40 00 2248-66 P co CCGG 148.320 -999.990 ... R4 1992 04 07 15 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 82952 MLO 1992 03 26 19 56 00 2197-66 P co CCGG 129.140 -999.990 ... R4 1992 04 22 09 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 82961 MLO 1992 04 03 19 40 00 2291-66 P co CCGG 142.490 -999.990 P.. R4 1992 04 10 16 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 82969 MLO 1992 04 03 19 40 00 2292-66 P co CCGG 151.110 -999.990 P.. R4 1992 04 10 16 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 82970 MLO 1992 04 10 19 40 00 2361-66 P co CCGG 136.670 -999.990 ... R4 1992 04 22 08 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 82975 MLO 1992 04 10 19 40 00 2362-66 P co CCGG 136.160 -999.990 ... R4 1992 04 22 09 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 82976 MLO 1992 04 17 19 38 00 2235-66 P co CCGG 155.760 -999.990 ... R4 1992 04 25 21 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 82981 MLO 1992 04 17 19 38 00 2236-66 P co CCGG 156.160 -999.990 ... R4 1992 04 25 21 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 82982 MLO 1992 04 24 19 38 00 2062-66 P co CCGG 126.300 -999.990 ... R4 1992 06 02 11 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 82988 MLO 1992 05 01 19 48 00 2365-66 P co CCGG 144.140 -999.990 ... R4 1992 06 02 10 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 82993 MLO 1992 05 01 19 48 00 2366-66 P co CCGG 145.990 -999.990 ... R4 1992 06 02 10 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 82994 MLO 1992 05 08 19 39 00 2219-66 P co CCGG 134.450 -999.990 ... R4 1992 06 02 10 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 82999 MLO 1992 05 08 19 39 00 2220-66 P co CCGG 132.650 -999.990 ... R4 1992 06 02 11 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 83000 MLO 1992 05 15 19 35 00 2113-66 P co CCGG 88.260 -999.990 ... R4 1992 06 02 09 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 83005 MLO 1992 05 15 19 35 00 2114-66 P co CCGG 87.660 -999.990 ... R4 1992 06 02 09 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 83006 MLO 1992 05 22 19 35 00 2239-66 P co CCGG 94.010 -999.990 ... R4 1992 06 10 17 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 83011 MLO 1992 05 22 19 35 00 2240-66 P co CCGG 95.290 -999.990 ... R4 1992 06 10 17 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 83012 MLO 1992 05 29 19 35 00 2043-66 P co CCGG 108.820 -999.990 ... R4 1992 06 10 16 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 83017 MLO 1992 05 29 19 35 00 2044-66 P co CCGG 107.430 -999.990 ... R4 1992 06 10 17 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 83018 MLO 1992 06 05 19 24 00 2347-66 P co CCGG 105.950 -999.990 ... R4 1992 06 17 08 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 83023 MLO 1992 06 05 19 24 00 2348-66 P co CCGG 106.450 -999.990 ... R4 1992 06 17 09 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 83024 MLO 1992 06 12 19 24 00 2225-66 P co CCGG 99.920 -999.990 ... R4 1992 06 26 15 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 83029 MLO 1992 06 19 19 25 00 2317-66 P co CCGG 105.240 -999.990 P.. R4 1992 07 29 10 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 83035 MLO 1992 06 19 19 25 00 2318-66 P co CCGG 101.200 -999.990 P.. R4 1992 07 29 11 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 83036 MLO 1992 06 26 19 29 00 2323-66 P co CCGG 83.310 -999.990 ... R4 1992 07 10 18 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 83041 MLO 1992 06 26 19 29 00 2324-66 P co CCGG 85.160 -999.990 ... R4 1992 07 10 18 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 83042 MLO 1992 07 01 19 41 00 2183-66 P co CCGG 78.760 -999.990 ... R4 1992 07 10 18 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 83045 MLO 1992 07 01 19 41 00 2184-66 P co CCGG 78.900 -999.990 ... R4 1992 07 10 18 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 83046 MLO 1992 07 10 20 02 00 2053-66 P co CCGG 98.040 -999.990 ... R4 1992 07 27 15 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 83051 MLO 1992 07 10 20 02 00 2054-66 P co CCGG 98.410 -999.990 ... R4 1992 07 27 15 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 83052 MLO 1992 07 17 19 21 00 2311-66 P co CCGG 85.280 -999.990 ... R4 1992 08 25 14 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 83055 MLO 1992 07 17 19 21 00 2312-66 P co CCGG 85.470 -999.990 ... R4 1992 08 25 15 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83056 MLO 1992 07 24 19 12 00 2035-66 P co CCGG 69.160 -999.990 ... R4 1992 08 04 12 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83063 MLO 1992 07 24 19 12 00 2036-66 P co CCGG 70.440 -999.990 ... R4 1992 08 04 12 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 83064 MLO 1992 07 31 19 59 00 2369-66 P co CCGG 79.940 -999.990 P.. R4 1992 08 05 16 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 83069 MLO 1992 07 31 19 59 00 2370-66 P co CCGG 131.410 -999.990 P.. R4 1992 08 05 16 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 83070 MLO 1992 08 07 19 57 00 2183-66 P co CCGG 71.540 -999.990 ... R4 1992 08 25 14 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 83075 MLO 1992 08 07 19 57 00 2184-66 P co CCGG 71.120 -999.990 ... R4 1992 08 25 14 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 83076 MLO 1992 08 14 19 36 00 2267-66 P co CCGG 71.670 -999.990 ... R4 1992 08 25 16 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 83081 MLO 1992 08 21 19 41 00 2365-66 P co CCGG 75.660 -999.990 ... R4 1992 09 24 10 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 83087 MLO 1992 08 21 19 41 00 2366-66 P co CCGG 76.520 -999.990 ... R4 1992 09 24 10 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 83088 MLO 1992 09 04 19 36 00 2003-66 P co CCGG 71.480 -999.990 ... R4 1992 09 23 15 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 83095 MLO 1992 09 04 19 36 00 2004-66 P co CCGG 72.450 -999.990 ... R4 1992 09 23 16 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 83096 MLO 1992 09 11 19 40 00 2185-66 P co CCGG 72.320 -999.990 ... R4 1992 10 09 09 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 83099 MLO 1992 09 11 19 40 00 2186-66 P co CCGG 70.730 -999.990 ... R4 1992 10 09 10 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 83100 MLO 1992 09 18 19 57 00 2147-66 P co CCGG 85.770 -999.990 ... R4 1992 10 30 14 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 83109 MLO 1992 09 18 19 57 00 2148-66 P co CCGG 87.140 -999.990 ... R4 1992 10 30 14 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 83110 MLO 1992 09 25 19 39 00 2239-66 P co CCGG 71.540 -999.990 ... R4 1992 10 09 10 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 83113 MLO 1992 09 25 19 39 00 2240-66 P co CCGG 71.410 -999.990 ... R4 1992 10 09 11 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 83114 MLO 1992 10 02 20 22 00 2021-66 P co CCGG 77.670 -999.990 ... R4 1992 10 09 09 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83119 MLO 1992 10 02 20 22 00 2022-66 P co CCGG 78.760 -999.990 ... R4 1992 10 09 09 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 83120 MLO 1992 10 09 19 58 00 2313-66 P co CCGG 72.450 -999.990 ... R4 1992 10 30 15 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 83125 MLO 1992 10 09 19 58 00 2314-66 P co CCGG 73.320 -999.990 ... R4 1992 10 30 15 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 83126 MLO 1992 10 16 20 18 00 2053-66 P co CCGG 69.960 -999.990 ... R4 1992 10 30 13 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 83131 MLO 1992 10 16 20 18 00 2054-66 P co CCGG 68.760 -999.990 ... R4 1992 10 30 13 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 83132 MLO 1992 10 23 19 37 00 2223-66 P co CCGG 56.940 -999.990 X.. R4 1992 10 30 13 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 83137 MLO 1992 10 23 19 37 00 2224-66 P co CCGG -999.990 -999.990 *.. R4 1992 10 30 14 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 83138 MLO 1992 10 30 19 48 00 2089-66 P co CCGG 95.570 -999.990 ... R4 1992 11 10 16 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 83143 MLO 1992 10 30 19 48 00 2090-66 P co CCGG 94.800 -999.990 ... R4 1992 11 10 17 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 83144 MLO 1992 11 06 19 39 00 2287-66 P co CCGG 73.670 -999.990 ... R4 1992 11 25 11 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 83149 MLO 1992 11 06 19 39 00 2288-66 P co CCGG 72.630 -999.990 ... R4 1992 11 25 11 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 83150 MLO 1992 11 13 19 37 00 2367-66 P co CCGG 128.100 -999.990 .X. R4 1992 12 09 12 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 83155 MLO 1992 11 13 19 37 00 2368-66 P co CCGG 129.280 -999.990 .X. R4 1992 12 09 12 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 83156 MLO 1992 11 20 21 06 00 2003-66 P co CCGG 84.590 -999.990 ... R4 1992 12 17 11 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 83161 MLO 1992 11 20 21 06 00 2004-66 P co CCGG 84.900 -999.990 ... R4 1992 12 17 11 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 83162 MLO 1992 11 27 19 53 00 2317-66 P co CCGG 98.230 -999.990 ... R4 1992 12 09 11 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 189623 MLO 1992 11 27 19 53 00 2318-66 P co CCGG 98.240 -999.990 ... R4 1992 12 09 11 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 189624 MLO 1992 12 04 20 15 00 2057-66 P co CCGG 91.480 -999.990 ... R4 1992 12 17 15 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 83169 MLO 1992 12 04 20 15 00 2058-66 P co CCGG 91.490 -999.990 ... R4 1992 12 17 15 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 83170 MLO 1992 12 11 19 55 00 2365-66 P co CCGG 115.530 -999.990 ... R4 1993 01 08 10 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 83173 MLO 1992 12 11 19 55 00 2366-66 P co CCGG 115.450 -999.990 ... R4 1993 01 08 11 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 83174 MLO 1992 12 18 20 07 00 2339-66 P co CCGG 92.590 -999.990 ... R4 1993 01 08 09 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 83177 MLO 1992 12 18 20 07 00 2340-66 P co CCGG 92.710 -999.990 ... R4 1993 01 08 09 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 83178 MLO 1992 12 31 19 47 00 2141-66 P co CCGG 102.980 -999.990 ... R4 1993 02 02 17 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83181 MLO 1992 12 31 19 47 00 2142-66 P co CCGG 103.510 -999.990 ... R4 1993 02 02 17 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 83182 MLO 1993 01 08 19 41 00 2101-66 P co CCGG 106.610 -999.990 ... R4 1993 02 05 15 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 83185 MLO 1993 01 08 19 41 00 2102-66 P co CCGG 107.360 -999.990 ... R4 1993 02 05 15 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 83186 MLO 1993 01 15 19 39 00 2173-66 P co CCGG 135.080 -999.990 .X. R4 1993 02 02 16 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 83189 MLO 1993 01 15 19 39 00 2174-66 P co CCGG 137.460 -999.990 .X. R4 1993 02 02 16 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 83190 MLO 1993 01 22 19 48 00 2089-66 P co CCGG 90.740 -999.990 ... R4 1993 02 02 18 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 83193 MLO 1993 01 22 19 48 00 2090-66 P co CCGG 91.770 -999.990 ... R4 1993 02 02 18 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 83194 MLO 1993 01 27 21 31 00 2343-66 P co CCGG 109.720 -999.990 ... R4 1993 02 05 14 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83195 MLO 1993 01 27 21 31 00 2344-66 P co CCGG 110.130 -999.990 ... R4 1993 02 05 14 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 83196 MLO 1993 01 29 19 23 00 2247-66 P co CCGG 93.310 -999.990 ... R4 1993 02 05 13 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 83201 MLO 1993 01 29 19 23 00 2248-66 P co CCGG 92.480 -999.990 ... R4 1993 02 05 13 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 83202 MLO 1993 02 05 19 54 00 2221-66 P co CCGG 95.410 -999.990 ... R4 1993 02 25 09 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 83205 MLO 1993 02 05 19 54 00 2222-66 P co CCGG 95.570 -999.990 ... R4 1993 02 25 09 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 83206 MLO 1993 02 12 19 20 00 2240-66 P co CCGG 108.090 -999.990 ... R4 1993 03 04 12 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 83209 MLO 1993 02 19 20 10 00 2119-66 P co CCGG 94.900 -999.990 ... R4 1993 03 04 11 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 83212 MLO 1993 02 19 20 10 00 2120-66 P co CCGG 96.430 -999.990 ... R4 1993 03 04 11 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 83213 MLO 1993 02 26 19 23 00 2281-66 P co CCGG 100.300 -999.990 ... R4 1993 03 12 10 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 83216 MLO 1993 02 26 19 23 00 2282-66 P co CCGG 99.300 -999.990 ... R4 1993 03 12 11 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 83217 MLO 1993 03 05 19 36 00 2369-66 P co CCGG 136.520 -999.990 ... R4 1993 03 31 12 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 83220 MLO 1993 03 05 19 36 00 2370-66 P co CCGG 135.560 -999.990 ... R4 1993 03 31 12 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 83221 MLO 1993 03 12 19 18 00 2053-66 P co CCGG 127.550 -999.990 ... R4 1993 03 29 15 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 83222 MLO 1993 03 12 19 18 00 2054-66 P co CCGG 129.070 -999.990 ... R4 1993 03 29 15 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 83223 MLO 1993 03 19 20 23 00 2219-66 P co CCGG 113.660 -999.990 ... R4 1993 03 31 11 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 83228 MLO 1993 03 19 20 23 00 2220-66 P co CCGG 115.820 -999.990 ... R4 1993 03 31 12 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 83229 MLO 1993 03 26 19 43 00 2367-66 P co CCGG 100.640 -999.990 ... R4 1993 03 31 11 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 83230 MLO 1993 03 26 19 43 00 2368-66 P co CCGG 98.680 -999.990 ... R4 1993 03 31 11 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 83231 MLO 1993 04 02 21 00 00 2255-66 P co CCGG 107.990 -999.990 ... R4 1993 04 06 14 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 83236 MLO 1993 04 02 21 00 00 2256-66 P co CCGG 108.730 -999.990 ... R4 1993 04 06 14 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 83237 MLO 1993 04 09 19 20 00 2349-66 P co CCGG 89.950 -999.990 ... R4 1993 04 26 09 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 83240 MLO 1993 04 09 19 20 00 2350-66 P co CCGG 90.940 -999.990 ... R4 1993 04 26 10 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 83241 MLO 1993 04 16 20 02 00 2093-66 P co CCGG 143.210 -999.990 ... R4 1993 04 23 15 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 83242 MLO 1993 04 16 20 02 00 2094-66 P co CCGG 143.940 -999.990 ... R4 1993 04 23 15 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 83243 MLO 1993 04 23 19 34 00 2325-66 P co CCGG 111.930 -999.990 ... R4 1993 05 13 12 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 83248 MLO 1993 04 23 19 34 00 2326-66 P co CCGG 110.600 -999.990 ... R4 1993 05 13 12 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 83249 MLO 1993 04 30 19 32 00 2225-66 P co CCGG 116.290 -999.990 ... R4 1993 05 13 14 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 83252 MLO 1993 04 30 19 32 00 2226-66 P co CCGG 114.430 -999.990 ... R4 1993 05 13 14 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 83253 MLO 1993 05 07 19 37 00 2207-66 P co CCGG 116.280 -999.990 ... R4 1993 06 08 09 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 83256 MLO 1993 05 07 19 37 00 2208-66 P co CCGG 115.510 -999.990 ... R4 1993 06 08 09 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 83257 MLO 1993 05 14 19 40 00 2365-66 P co CCGG 107.960 -999.990 ... R4 1993 05 24 15 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 83260 MLO 1993 05 14 19 40 00 2366-66 P co CCGG 108.770 -999.990 ... R4 1993 05 24 15 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 83261 MLO 1993 05 21 19 45 00 2189-66 P co CCGG 111.720 -999.990 ... R4 1993 06 07 15 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 83264 MLO 1993 05 21 19 45 00 2190-66 P co CCGG 114.230 -999.990 ... R4 1993 06 07 16 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 83265 MLO 1993 05 28 19 39 00 2053-66 P co CCGG 101.000 -999.990 ... R4 1993 06 07 15 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 83268 MLO 1993 05 28 19 39 00 2054-66 P co CCGG 101.000 -999.990 ... R4 1993 06 07 15 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 83269 MLO 1993 06 04 19 40 00 2227-66 P co CCGG 82.120 -999.990 ... R4 1993 06 14 11 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 83272 MLO 1993 06 04 19 40 00 2228-66 P co CCGG 82.380 -999.990 ... R4 1993 06 14 11 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 83273 MLO 1993 06 11 19 43 00 2323-66 P co CCGG 93.000 -999.990 ... R4 1993 06 25 13 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 83276 MLO 1993 06 11 19 43 00 2324-66 P co CCGG 91.070 -999.990 ... R4 1993 06 25 14 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 83277 MLO 1993 06 18 19 43 00 2329-66 P co CCGG 86.030 -999.990 ... R4 1993 06 25 14 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 83280 MLO 1993 06 18 19 43 00 2330-66 P co CCGG 86.280 -999.990 ... R4 1993 06 25 15 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83281 MLO 1993 06 25 19 40 00 2367-66 P co CCGG 91.610 -999.990 ... R4 1993 07 26 10 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 83284 MLO 1993 06 25 19 40 00 2368-66 P co CCGG 90.910 -999.990 ... R4 1993 07 26 11 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 83285 MLO 1993 07 02 20 06 00 2337-66 P co CCGG 89.480 -999.990 ... R4 1993 07 26 12 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83288 MLO 1993 07 02 20 06 00 2338-66 P co CCGG 90.060 -999.990 ... R4 1993 07 26 12 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 83289 MLO 1993 07 09 19 50 00 2267-66 P co CCGG 73.110 -999.990 ... R4 1993 08 04 10 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 83292 MLO 1993 07 16 19 52 00 2287-66 P co CCGG 75.860 -999.990 ... R4 1993 08 11 10 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83296 MLO 1993 07 16 19 52 00 2288-66 P co CCGG 74.420 -999.990 ... R4 1993 08 11 10 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 83297 MLO 1993 07 23 20 00 00 2227-66 P co CCGG 67.460 -999.990 ... R4 1993 08 03 16 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 83298 MLO 1993 07 23 20 00 00 2228-66 P co CCGG 67.650 -999.990 ... R4 1993 08 03 16 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 83299 MLO 1993 07 30 19 46 00 2237-66 P co CCGG 70.270 -999.990 ... R4 1993 08 11 09 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 83304 MLO 1993 07 30 19 46 00 2238-66 P co CCGG 72.020 -999.990 ... R4 1993 08 11 10 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 83305 MLO 1993 08 06 19 44 00 2053-66 P co CCGG 65.250 -999.990 ... R4 1993 09 02 10 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 83308 MLO 1993 08 06 19 44 00 2054-66 P co CCGG 64.330 -999.990 ... R4 1993 09 02 10 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 83309 MLO 1993 08 13 19 20 00 2323-66 P co CCGG 69.120 -999.990 ... R4 1993 08 23 12 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 83310 MLO 1993 08 13 19 20 00 2324-66 P co CCGG 68.300 -999.990 ... R4 1993 08 23 12 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 83311 MLO 1993 08 20 19 52 00 2365-66 P co CCGG 68.840 -999.990 ... R4 1993 08 26 08 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 83316 MLO 1993 08 20 19 52 00 2366-66 P co CCGG 69.790 -999.990 ... R4 1993 08 26 09 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 83317 MLO 1993 08 27 19 32 00 2311-66 P co CCGG 71.250 -999.990 ... R4 1993 09 02 10 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 83320 MLO 1993 08 27 19 32 00 2312-66 P co CCGG 71.210 -999.990 ... R4 1993 09 02 10 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 83321 MLO 1993 09 03 19 28 00 2051-66 P co CCGG 82.660 -999.990 ... R4 1993 09 20 14 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 83324 MLO 1993 09 03 19 28 00 2052-66 P co CCGG 82.630 -999.990 ... R4 1993 09 20 14 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 83325 MLO 1993 09 10 20 08 00 2325-66 P co CCGG 82.950 -999.990 ... R4 1993 09 20 13 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 83328 MLO 1993 09 10 20 08 00 2326-66 P co CCGG 83.260 -999.990 ... R4 1993 09 20 14 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 83329 MLO 1993 09 23 19 53 00 2265-66 P co CCGG 71.360 -999.990 ... R4 1993 11 03 09 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 83336 MLO 1993 09 23 19 53 00 2266-66 P co CCGG 71.020 -999.990 ... R4 1993 11 03 09 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 83337 MLO 1993 10 08 19 41 00 2337-66 P co CCGG 83.510 -999.990 ... R4 1993 10 20 09 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 83344 MLO 1993 10 08 19 41 00 2338-66 P co CCGG 82.450 -999.990 ... R4 1993 10 20 09 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 83345 MLO 1993 10 15 19 59 00 2151-66 P co CCGG 94.020 -999.990 ... R4 1993 10 20 10 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 83348 MLO 1993 10 15 19 59 00 2152-66 P co CCGG 94.450 -999.990 ... R4 1993 10 20 10 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 83349 MLO 1993 10 22 19 48 00 2227-66 P co CCGG 97.180 -999.990 ... R4 1993 12 01 15 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 83352 MLO 1993 10 22 19 48 00 2228-66 P co CCGG 97.690 -999.990 ... R4 1993 12 01 15 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 83353 MLO 1993 10 29 19 46 00 2093-66 P co CCGG 105.560 -999.990 ... R4 1993 11 03 08 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 83356 MLO 1993 10 29 19 46 00 2094-66 P co CCGG 104.700 -999.990 ... R4 1993 11 03 08 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 83357 MLO 1993 11 05 19 48 00 2369-66 P co CCGG 85.550 -999.990 ... R4 1993 11 09 15 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 83360 MLO 1993 11 05 19 48 00 2370-66 P co CCGG 85.790 -999.990 ... R4 1993 11 09 15 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 83361 MLO 1993 11 12 19 41 00 2001-66 P co CCGG 108.050 -999.990 ... R4 1993 12 01 16 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 83364 MLO 1993 11 12 19 41 00 2002-66 P co CCGG 108.990 -999.990 ... R4 1993 12 01 16 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 83365 MLO 1993 11 19 19 41 00 6255-66 P co CCGG 108.770 -999.990 ... R4 1993 12 06 15 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 83368 MLO 1993 11 19 19 41 00 6256-66 P co CCGG 110.100 -999.990 ... R4 1993 12 06 15 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 83369 MLO 1993 11 26 19 38 00 6759-66 P co CCGG 98.280 -999.990 ... R4 1993 12 06 16 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 83370 MLO 1993 11 26 19 38 00 6760-66 P co CCGG 96.530 -999.990 ... R4 1993 12 06 16 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 83371 MLO 1993 12 03 20 16 00 6855-66 P co CCGG 95.980 -999.990 ... R4 1994 01 12 13 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 83376 MLO 1993 12 03 20 16 00 6856-66 P co CCGG 94.130 -999.990 ... R4 1994 01 12 13 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 83377 MLO 1993 12 10 19 48 00 6593-66 P co CCGG 99.920 -999.990 ... R4 1994 01 12 13 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 83380 MLO 1993 12 10 19 48 00 6594-66 P co CCGG 102.100 -999.990 ... R4 1994 01 12 13 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 83381 MLO 1993 12 17 19 36 00 6417-66 P co CCGG 92.290 -999.990 ... R4 1994 01 24 10 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 83384 MLO 1993 12 23 19 42 00 6297-66 P co CCGG 122.300 -999.990 ... R4 1994 01 24 09 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 83388 MLO 1993 12 23 19 42 00 6298-66 P co CCGG 122.030 -999.990 ... R4 1994 01 24 10 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83389 MLO 1993 12 30 17 25 00 6649-66 P co CCGG 100.970 -999.990 ... R4 1994 01 21 09 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 83390 MLO 1993 12 30 17 25 00 6650-66 P co CCGG 101.730 -999.990 ... R4 1994 01 21 09 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 83391 MLO 1994 01 07 19 58 00 6037-66 P co CCGG 102.300 -999.990 ... R4 1994 01 21 08 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 83395 MLO 1994 01 07 19 58 00 6038-66 P co CCGG 101.900 -999.990 ... R4 1994 01 21 08 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 83396 MLO 1994 01 14 20 28 00 6183-66 P co CCGG 121.960 -999.990 ... R4 1994 02 15 08 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 83399 MLO 1994 01 14 20 28 00 6184-66 P co CCGG 122.420 -999.990 ... R4 1994 02 15 09 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 83400 MLO 1994 01 21 20 35 00 6815-66 P co CCGG 129.140 -999.990 ... R4 1994 02 15 08 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 83403 MLO 1994 01 21 20 35 00 6816-66 P co CCGG 128.040 -999.990 ... R4 1994 02 15 08 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 83404 MLO 1994 01 28 20 10 00 6371-66 P co CCGG 142.450 -999.990 ... R4 1994 02 25 13 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 83405 MLO 1994 01 28 20 10 00 6372-66 P co CCGG 142.350 -999.990 ... R4 1994 02 25 14 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 83406 MLO 1994 02 04 19 40 00 6325-66 P co CCGG 110.590 -999.990 ... R4 1994 02 25 11 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 83411 MLO 1994 02 04 19 40 00 6326-66 P co CCGG 111.400 -999.990 ... R4 1994 02 25 11 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 83412 MLO 1994 02 11 19 58 00 6323-66 P co CCGG 113.020 -999.990 ... R4 1994 03 01 11 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 83415 MLO 1994 02 11 19 58 00 6324-66 P co CCGG 112.470 -999.990 ... R4 1994 03 01 11 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 83416 MLO 1994 02 18 20 03 00 6683-66 P co CCGG 92.180 -999.990 ... R4 1994 03 01 12 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 83419 MLO 1994 02 18 20 03 00 6684-66 P co CCGG 92.120 -999.990 ... R4 1994 03 01 13 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 83420 MLO 1994 02 25 19 46 00 6161-66 P co CCGG 131.200 -999.990 ... R4 1994 04 11 16 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 83423 MLO 1994 02 25 19 46 00 6162-66 P co CCGG 129.760 -999.990 ... R4 1994 04 11 16 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 83424 MLO 1994 03 04 20 14 00 6391-66 P co CCGG 87.490 -999.990 ... R4 1994 04 11 15 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 83427 MLO 1994 03 04 20 14 00 6392-66 P co CCGG 85.770 -999.990 ... R4 1994 04 11 16 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 83428 MLO 1994 03 11 19 41 00 6851-66 P co CCGG 93.190 -999.990 ... R4 1994 03 23 11 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 83431 MLO 1994 03 11 19 41 00 6852-66 P co CCGG 91.320 -999.990 ... R4 1994 03 23 11 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 83432 MLO 1994 03 18 20 02 00 6557-66 P co CCGG 160.760 -999.990 .X. R4 1994 03 23 12 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 83435 MLO 1994 03 18 20 02 00 6558-66 P co CCGG 161.560 -999.990 .X. R4 1994 03 23 12 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 83436 MLO 1994 03 25 20 04 00 6849-66 P co CCGG 148.740 -999.990 ... R4 1994 04 26 12 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 83439 MLO 1994 03 25 20 04 00 6850-66 P co CCGG 147.610 -999.990 ... R4 1994 04 26 12 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 83440 MLO 1994 04 01 19 47 00 6170-66 P co CCGG 127.710 -999.990 ... R4 1994 04 26 12 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 83444 MLO 1994 04 08 19 48 00 6371-66 P co CCGG 129.470 -999.990 ... R4 1994 05 16 11 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 83447 MLO 1994 04 08 19 48 00 6372-66 P co CCGG 129.020 -999.990 ... R4 1994 05 16 11 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 83448 MLO 1994 04 15 19 43 00 6165-66 P co CCGG 110.290 -999.990 ... R4 1994 05 16 10 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 83451 MLO 1994 04 15 19 43 00 6166-66 P co CCGG 111.060 -999.990 ... R4 1994 05 16 11 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 83452 MLO 1994 04 22 19 41 00 6559-66 P co CCGG 145.310 -999.990 ... R4 1994 05 11 08 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 83455 MLO 1994 04 22 19 41 00 6560-66 P co CCGG 144.610 -999.990 ... R4 1994 05 11 08 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 83456 MLO 1994 04 29 19 47 00 6773-66 P co CCGG 129.170 -999.990 ... R4 1994 05 11 08 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 83459 MLO 1994 04 29 19 47 00 6774-66 P co CCGG 126.750 -999.990 ... R4 1994 05 11 09 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 83460 MLO 1994 05 06 19 39 00 6039-66 P co CCGG 110.210 -999.990 ... R4 1994 05 20 08 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 83463 MLO 1994 05 06 19 39 00 6040-66 P co CCGG 111.400 -999.990 ... R4 1994 05 20 09 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83464 MLO 1994 05 13 20 00 00 6177-66 P co CCGG 106.460 -999.990 ... R4 1994 05 20 07 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 83467 MLO 1994 05 13 20 00 00 6178-66 P co CCGG 106.740 -999.990 ... R4 1994 05 20 08 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 83468 MLO 1994 05 20 20 02 00 6399-66 P co CCGG 104.690 -999.990 ... R4 1994 06 07 15 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 83469 MLO 1994 05 20 20 02 00 6400-66 P co CCGG 102.700 -999.990 ... R4 1994 06 07 16 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 83470 MLO 1994 05 27 19 48 00 6677-66 P co CCGG 101.820 -999.990 ... R4 1994 06 07 14 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 83475 MLO 1994 05 27 19 48 00 6678-66 P co CCGG 100.790 -999.990 ... R4 1994 06 07 14 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 83476 MLO 1994 06 03 20 33 00 6647-66 P co CCGG 96.340 -999.990 ... R4 1994 07 06 12 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 83479 MLO 1994 06 03 20 33 00 6648-66 P co CCGG 96.580 -999.990 ... R4 1994 07 06 12 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 83480 MLO 1994 06 08 21 27 00 6059-66 P co CCGG 105.370 -999.990 ... R4 1994 07 06 12 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 83481 MLO 1994 06 08 21 27 00 6060-66 P co CCGG 104.300 -999.990 ... R4 1994 07 06 12 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 83482 MLO 1994 06 10 19 34 00 6769-66 P co CCGG 92.230 -999.990 ... R4 1994 06 24 09 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 83485 MLO 1994 06 10 19 34 00 6770-66 P co CCGG 91.870 -999.990 ... R4 1994 06 24 09 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 83486 MLO 1994 06 17 19 28 00 6817-66 P co CCGG 80.880 -999.990 ... R4 1994 06 27 09 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 83489 MLO 1994 06 17 19 28 00 6818-66 P co CCGG 79.390 -999.990 ... R4 1994 06 27 09 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 83490 MLO 1994 06 24 19 58 00 6295-66 P co CCGG 85.600 -999.990 ... R4 1994 07 01 14 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 83493 MLO 1994 06 24 19 58 00 6296-66 P co CCGG 85.520 -999.990 ... R4 1994 07 01 15 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 83494 MLO 1994 07 01 19 36 00 6897-66 P co CCGG 81.180 -999.990 ... R4 1994 07 07 12 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 83497 MLO 1994 07 01 19 36 00 6898-66 P co CCGG 79.990 -999.990 ... R4 1994 07 07 12 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 83498 MLO 1994 07 08 19 59 00 6019-66 P co CCGG 78.290 -999.990 ... R4 1994 07 22 08 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 83501 MLO 1994 07 08 19 59 00 6020-66 P co CCGG 77.430 -999.990 ... R4 1994 07 22 08 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 83502 MLO 1994 07 14 21 17 00 6073-66 P co CCGG 78.300 -999.990 ... R4 1994 07 22 09 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 83505 MLO 1994 07 14 21 17 00 6074-66 P co CCGG 78.240 -999.990 ... R4 1994 07 22 09 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 83506 MLO 1994 07 21 20 24 00 6599-66 P co CCGG 68.890 -999.990 ... R4 1994 08 22 14 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 83509 MLO 1994 07 21 20 24 00 6600-66 P co CCGG 70.310 -999.990 ... R4 1994 08 22 14 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 83510 MLO 1994 07 28 20 13 00 6087-66 P co CCGG 67.680 -999.990 ... R4 1994 08 22 12 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 83513 MLO 1994 07 28 20 13 00 6088-66 P co CCGG 66.210 -999.990 ... R4 1994 08 22 13 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83514 MLO 1994 08 05 19 50 00 6493-66 P co CCGG 67.530 -999.990 ... R4 1994 08 31 12 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 83517 MLO 1994 08 05 19 50 00 6494-66 P co CCGG 67.450 -999.990 ... R4 1994 08 31 12 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 83518 MLO 1994 08 12 19 48 00 6789-66 P co CCGG 67.620 -999.990 ... R4 1994 08 29 14 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 83521 MLO 1994 08 12 19 48 00 6790-66 P co CCGG 67.310 -999.990 ... R4 1994 08 29 14 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 83522 MLO 1994 08 19 19 48 00 6611-66 P co CCGG 73.110 -999.990 ... R4 1994 08 29 13 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 83525 MLO 1994 08 19 19 48 00 6612-66 P co CCGG 72.360 -999.990 ... R4 1994 08 29 14 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 83526 MLO 1994 08 26 19 45 00 6757-66 P co CCGG 73.400 -999.990 ... R4 1994 09 13 09 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 83529 MLO 1994 08 26 19 45 00 6758-66 P co CCGG 72.760 -999.990 ... R4 1994 09 13 09 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 83530 MLO 1994 09 02 19 41 00 6579-66 P co CCGG 73.280 -999.990 ... R4 1994 09 13 08 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 83533 MLO 1994 09 02 19 41 00 6580-66 P co CCGG 72.490 -999.990 ... R4 1994 09 13 09 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 83534 MLO 1994 09 09 20 05 00 6577-66 P co CCGG 84.590 -999.990 ... R4 1994 09 27 09 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 83535 MLO 1994 09 09 20 05 00 6578-66 P co CCGG 85.240 -999.990 ... R4 1994 09 27 09 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83536 MLO 1994 09 16 19 40 00 6709-66 P co CCGG 85.840 -999.990 ... R4 1994 09 27 11 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 83541 MLO 1994 09 16 19 40 00 6710-66 P co CCGG 85.390 -999.990 ... R4 1994 09 27 11 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 83542 MLO 1994 09 23 19 43 00 6825-66 P co CCGG 93.540 -999.990 ... R4 1994 10 06 08 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 83545 MLO 1994 09 23 19 43 00 6826-66 P co CCGG 92.790 -999.990 ... R4 1994 10 06 08 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 83546 MLO 1994 09 30 19 44 00 6637-66 P co CCGG 82.950 -999.990 ... R4 1994 10 06 11 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 83549 MLO 1994 10 07 19 39 00 6289-66 P co CCGG 95.950 -999.990 ... R4 1994 11 07 09 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 83552 MLO 1994 10 07 19 39 00 6290-66 P co CCGG 96.580 -999.990 ... R4 1994 11 07 09 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 83553 MLO 1994 10 14 20 01 00 6451-66 P co CCGG 94.960 -999.990 ... R4 1994 11 07 09 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 83556 MLO 1994 10 14 20 01 00 6452-66 P co CCGG 93.950 -999.990 ... R4 1994 11 07 09 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 83557 MLO 1994 10 21 20 03 00 6263-66 P co CCGG 109.000 -999.990 ... R4 1994 11 02 15 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 83560 MLO 1994 10 21 20 03 00 6264-66 P co CCGG 109.850 -999.990 ... R4 1994 11 02 15 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 83561 MLO 1994 10 28 19 52 00 6745-66 P co CCGG 130.510 -999.990 ... R4 1994 11 03 10 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 83564 MLO 1994 11 02 19 49 00 6007-66 P co CCGG 92.280 -999.990 ... R4 1994 11 16 11 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 83568 MLO 1994 11 02 19 49 00 6008-66 P co CCGG 90.910 -999.990 ... R4 1994 11 16 11 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 83569 MLO 1994 11 10 19 27 00 6405-66 P co CCGG 103.110 -999.990 ... R4 1994 11 16 08 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 83572 MLO 1994 11 10 19 27 00 6406-66 P co CCGG 103.080 -999.990 ... R4 1994 11 16 08 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 83573 MLO 1994 11 18 19 59 00 6301-66 P co CCGG 87.350 -999.990 ... R4 1994 12 20 08 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 83576 MLO 1994 11 18 19 59 00 6302-66 P co CCGG 87.200 -999.990 ... R4 1994 12 20 09 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 83577 MLO 1994 11 25 21 25 00 6493-66 P co CCGG 113.820 -999.990 ... R4 1994 12 20 09 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 83580 MLO 1994 11 25 21 25 00 6494-66 P co CCGG 112.330 -999.990 ... R4 1994 12 20 09 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 83581 MLO 1994 11 30 20 28 00 6215-66 P co CCGG 105.220 -999.990 ... R4 1994 12 20 09 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 83584 MLO 1994 11 30 20 28 00 6216-66 P co CCGG 105.420 -999.990 ... R4 1994 12 20 10 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 83585 MLO 1994 12 09 19 46 00 6413-66 P co CCGG 137.140 -999.990 ... R4 1994 12 20 10 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 83588 MLO 1994 12 09 19 46 00 6414-66 P co CCGG 138.790 -999.990 ... R4 1994 12 20 10 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 83589 MLO 1994 12 16 19 45 00 6823-66 P co CCGG 131.790 -999.990 ... R4 1995 01 12 12 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 83592 MLO 1994 12 16 19 45 00 6824-66 P co CCGG 133.130 -999.990 ... R4 1995 01 12 12 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 83593 MLO 1994 12 30 20 19 00 6105-66 P co CCGG 118.870 -999.990 ... R4 1995 01 12 11 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 83596 MLO 1994 12 30 20 19 00 6106-66 P co CCGG 117.620 -999.990 ... R4 1995 01 12 12 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 83597 MLO 1995 01 06 20 06 00 6699-66 P co CCGG 160.410 -999.990 .X. R4 1995 02 01 14 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 83600 MLO 1995 01 06 20 06 00 6700-66 P co CCGG 161.090 -999.990 .X. R4 1995 02 01 15 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 83601 MLO 1995 01 13 20 12 00 6087-66 P co CCGG 115.710 -999.990 ... R4 1995 02 13 08 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 83604 MLO 1995 01 13 20 12 00 6088-66 P co CCGG 115.430 -999.990 ... R4 1995 02 13 09 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 83605 MLO 1995 01 20 19 28 00 6851-66 P co CCGG 99.950 -999.990 ... R4 1995 02 13 09 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 83608 MLO 1995 01 20 19 28 00 6852-66 P co CCGG 99.730 -999.990 ... R4 1995 02 13 09 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 83609 MLO 1995 01 27 19 53 00 6005-66 P co CCGG 93.660 -999.990 ... R4 1995 02 13 10 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 83611 MLO 1995 01 27 19 53 00 6006-66 P co CCGG 92.990 -999.990 ... R4 1995 02 13 10 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 83612 MLO 1995 02 03 19 37 00 6155-66 P co CCGG 99.510 -999.990 ... R4 1995 02 13 10 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 83615 MLO 1995 02 03 19 37 00 6156-66 P co CCGG 99.570 -999.990 ... R4 1995 02 13 10 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 83616 MLO 1995 02 10 19 42 00 6443-66 P co CCGG 122.990 -999.990 ... R4 1995 02 24 10 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 83619 MLO 1995 02 10 19 42 00 6444-66 P co CCGG 122.780 -999.990 ... R4 1995 02 24 10 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 83620 MLO 1995 02 17 19 57 00 6757-66 P co CCGG 106.550 -999.990 ... R4 1995 02 24 11 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 83623 MLO 1995 02 17 19 57 00 6758-66 P co CCGG 106.410 -999.990 ... R4 1995 02 24 11 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 83624 MLO 1995 02 24 19 46 00 6325-66 P co CCGG 130.110 -999.990 ... R4 1995 03 09 08 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 83627 MLO 1995 02 24 19 46 00 6326-66 P co CCGG 129.140 -999.990 ... R4 1995 03 09 08 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 83628 MLO 1995 03 03 19 54 00 6677-66 P co CCGG 149.190 -999.990 ... R4 1995 03 09 09 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 83631 MLO 1995 03 03 19 54 00 6678-66 P co CCGG 147.090 -999.990 ... R4 1995 03 09 09 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 83632 MLO 1995 03 10 19 55 00 6341-66 P co CCGG 110.580 -999.990 ... R4 1995 03 31 08 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 83635 MLO 1995 03 10 19 55 00 6342-66 P co CCGG 108.900 -999.990 ... R4 1995 03 31 09 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 83636 MLO 1995 03 17 20 01 00 6823-66 P co CCGG 98.760 -999.990 ... R4 1995 03 31 10 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 83639 MLO 1995 03 17 20 01 00 6824-66 P co CCGG 99.550 -999.990 ... R4 1995 03 31 10 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 83640 MLO 1995 03 24 19 59 00 6417-66 P co CCGG 122.860 -999.990 ... R4 1995 04 17 09 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 83643 MLO 1995 03 31 19 44 00 6155-66 P co CCGG 177.130 -999.990 .X. R4 1995 04 17 09 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 83647 MLO 1995 03 31 19 44 00 6156-66 P co CCGG 175.450 -999.990 .X. R4 1995 04 17 09 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83648 MLO 1995 04 07 20 05 00 6689-66 P co CCGG 136.300 -999.990 ... R4 1995 05 05 08 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 83649 MLO 1995 04 07 20 05 00 6690-66 P co CCGG 136.690 -999.990 ... R4 1995 05 05 08 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 83650 MLO 1995 04 14 19 57 00 6753-66 P co CCGG 122.080 -999.990 ... R4 1995 05 05 10 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 83654 MLO 1995 04 14 19 57 00 6754-66 P co CCGG 121.080 -999.990 ... R4 1995 05 05 10 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83655 MLO 1995 04 21 19 35 00 6809-66 P co CCGG 109.220 -999.990 ... R4 1995 05 18 14 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83658 MLO 1995 04 21 19 35 00 6810-66 P co CCGG 110.290 -999.990 ... R4 1995 05 18 14 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 83659 MLO 1995 04 26 20 26 00 6385-66 P co CCGG 133.210 -999.990 ... R4 1995 05 18 15 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 83662 MLO 1995 04 26 20 26 00 6386-66 P co CCGG 130.540 -999.990 ... R4 1995 05 18 15 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 83663 MLO 1995 05 05 19 29 00 6193-66 P co CCGG 93.910 -999.990 ... R4 1995 06 07 09 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 83666 MLO 1995 05 05 19 29 00 6194-66 P co CCGG 92.900 -999.990 ... R4 1995 06 07 09 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 83667 MLO 1995 05 12 19 48 00 6481-66 P co CCGG 104.440 -999.990 ... R4 1995 06 07 08 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 83670 MLO 1995 05 12 19 48 00 6482-66 P co CCGG 103.710 -999.990 ... R4 1995 06 07 08 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 83671 MLO 1995 05 19 19 47 00 6327-66 P co CCGG 113.500 -999.990 ... R4 1995 06 07 10 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 83674 MLO 1995 05 19 19 47 00 6328-66 P co CCGG 113.650 -999.990 ... R4 1995 06 07 10 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 83675 MLO 1995 05 26 19 47 00 6129-66 P co CCGG 110.490 -999.990 ... R4 1995 06 06 17 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 83678 MLO 1995 05 26 19 47 00 6130-66 P co CCGG 110.330 -999.990 ... R4 1995 06 06 17 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83679 MLO 1995 06 02 20 17 00 6189-66 P co CCGG 124.830 -999.990 ... R4 1995 06 15 09 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 83682 MLO 1995 06 02 20 17 00 6190-66 P co CCGG 123.660 -999.990 ... R4 1995 06 15 10 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 83683 MLO 1995 06 09 19 45 00 6817-66 P co CCGG 107.720 -999.990 ... R4 1995 06 15 09 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 83686 MLO 1995 06 09 19 45 00 6818-66 P co CCGG 107.150 -999.990 ... R4 1995 06 15 09 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 83687 MLO 1995 06 16 19 49 00 6207-66 P co CCGG 86.010 -999.990 ... R4 1995 06 26 10 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 83690 MLO 1995 06 16 19 49 00 6208-66 P co CCGG 85.000 -999.990 ... R4 1995 06 26 10 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 83691 MLO 1995 06 21 19 43 00 6809-66 P co CCGG 92.430 -999.990 ... R4 1995 06 23 18 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 83694 MLO 1995 06 21 19 43 00 6810-66 P co CCGG 92.000 -999.990 ... R4 1995 06 23 18 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 83695 MLO 1995 06 30 19 33 00 6055-66 P co CCGG 81.040 -999.990 ... R7 1995 08 11 09 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 83698 MLO 1995 06 30 19 33 00 6056-66 P co CCGG 79.670 -999.990 ... R7 1995 08 11 10 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 83699 MLO 1995 07 07 20 07 00 6847-66 P co CCGG 83.490 -999.990 ... R7 1995 08 11 08 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 83700 MLO 1995 07 07 20 07 00 6848-66 P co CCGG 82.780 -999.990 ... R7 1995 08 11 09 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 83701 MLO 1995 07 14 20 32 00 6051-66 P co CCGG 76.690 -999.990 ... R4 1995 08 01 09 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 83706 MLO 1995 07 14 20 32 00 6052-66 P co CCGG 75.330 -999.990 ... R4 1995 08 01 10 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83707 MLO 1995 07 21 19 51 00 6859-66 P co CCGG 77.610 -999.990 ... R4 1995 08 01 09 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 83710 MLO 1995 07 21 19 51 00 6860-66 P co CCGG 77.570 -999.990 ... R4 1995 08 01 09 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 83711 MLO 1995 07 28 19 53 00 6459-66 P co CCGG 69.710 -999.990 ... R7 1995 08 29 15 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 83714 MLO 1995 07 28 19 53 00 6460-66 P co CCGG 71.220 -999.990 ... R7 1995 08 29 16 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 83715 MLO 1995 08 03 19 49 00 6009-66 P co CCGG 73.130 -999.990 ... R7 1995 08 29 17 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 83718 MLO 1995 08 03 19 49 00 6010-66 P co CCGG 70.960 -999.990 ... R7 1995 08 29 17 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 83719 MLO 1995 08 11 19 52 00 6555-66 P co CCGG 79.150 -999.990 ... R7 1995 08 30 08 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 83722 MLO 1995 08 11 19 52 00 6556-66 P co CCGG 77.220 -999.990 ... R7 1995 08 30 08 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 83723 MLO 1995 08 18 19 46 00 6595-66 P co CCGG 88.490 -999.990 ... R7 1995 08 30 07 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 83726 MLO 1995 08 18 19 46 00 6596-66 P co CCGG 87.820 -999.990 ... R7 1995 08 30 08 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83727 MLO 1995 08 25 19 46 00 6395-66 P co CCGG 80.330 -999.990 ... R7 1995 09 14 16 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 83730 MLO 1995 08 25 19 46 00 6396-66 P co CCGG 80.400 -999.990 ... R7 1995 09 14 16 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 83731 MLO 1995 09 01 20 20 00 6211-66 P co CCGG 91.660 -999.990 ... R7 1995 09 14 16 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 83734 MLO 1995 09 01 20 20 00 6212-66 P co CCGG 89.040 -999.990 ... R7 1995 09 14 16 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 83735 MLO 1995 09 08 19 59 00 6015-66 P co CCGG 68.100 -999.990 ... R7 1995 10 06 12 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 83738 MLO 1995 09 08 19 59 00 6016-66 P co CCGG 70.600 -999.990 ... R7 1995 10 06 12 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 83739 MLO 1995 09 15 19 51 00 6011-66 P co CCGG 71.350 -999.990 ... R7 1995 10 06 13 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 83742 MLO 1995 09 15 19 51 00 6012-66 P co CCGG 69.820 -999.990 ... R7 1995 10 06 13 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 83743 MLO 1995 09 22 20 21 00 6157-66 P co CCGG 77.690 -999.990 ... R7 1995 10 30 10 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 83746 MLO 1995 09 22 20 21 00 6158-66 P co CCGG 76.170 -999.990 ... R7 1995 10 30 10 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 83747 MLO 1995 09 29 20 14 00 6237-66 P co CCGG 81.610 -999.990 ... R7 1995 10 30 10 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 83750 MLO 1995 09 29 20 14 00 6238-66 P co CCGG 80.100 -999.990 ... R7 1995 10 30 10 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 83751 MLO 1995 10 06 20 04 00 6051-66 P co CCGG 86.170 -999.990 ... R7 1995 10 18 17 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 83754 MLO 1995 10 06 20 04 00 6052-66 P co CCGG 85.510 -999.990 ... R7 1995 10 18 17 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 83755 MLO 1995 10 13 19 34 00 6859-66 P co CCGG 95.510 -999.990 ... R7 1995 10 18 14 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 83758 MLO 1995 10 13 19 34 00 6860-66 P co CCGG 96.170 -999.990 ... R7 1995 10 18 15 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 83759 MLO 1995 10 18 19 50 00 6349-66 P co CCGG 90.340 -999.990 ... R7 1995 11 27 17 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 83762 MLO 1995 10 18 19 50 00 6350-66 P co CCGG 89.610 -999.990 ... R7 1995 11 27 18 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 83763 MLO 1995 10 27 19 51 00 6533-66 P co CCGG 79.090 -999.990 ... R7 1995 11 27 17 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 83766 MLO 1995 10 27 19 51 00 6534-66 P co CCGG 78.040 -999.990 ... R7 1995 11 27 17 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 83767 MLO 1995 11 03 19 59 00 6301-66 P co CCGG 71.660 -999.990 ... R7 1995 11 24 10 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 83770 MLO 1995 11 03 19 59 00 6302-66 P co CCGG 71.890 -999.990 ... R7 1995 11 24 10 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 83771 MLO 1995 11 09 20 32 00 6295-66 P co CCGG 93.330 -999.990 ... R7 1995 11 22 11 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83774 MLO 1995 11 09 20 32 00 6296-66 P co CCGG 92.780 -999.990 ... R7 1995 11 22 11 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 83775 MLO 1995 11 17 20 05 00 6553-66 P co CCGG 82.330 -999.990 ... R7 1995 12 01 10 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 83778 MLO 1995 11 17 20 05 00 6554-66 P co CCGG 82.560 -999.990 ... R7 1995 12 01 10 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 83779 MLO 1995 11 24 20 00 00 6587-66 P co CCGG 111.600 -999.990 ... R7 1995 12 01 09 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 83780 MLO 1995 11 24 20 00 00 6588-66 P co CCGG 112.520 -999.990 ... R7 1995 12 01 10 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 83781 MLO 1995 12 01 19 33 00 6583-66 P co CCGG 89.710 -999.990 ... R7 1995 12 20 12 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 83784 MLO 1995 12 01 19 33 00 6584-66 P co CCGG 90.400 -999.990 ... R7 1995 12 20 12 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 83785 MLO 1995 12 08 19 55 00 6781-66 P co CCGG 93.740 -999.990 ... R7 1995 12 14 11 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 83788 MLO 1995 12 08 19 55 00 6782-66 P co CCGG 91.730 -999.990 ... R7 1995 12 14 12 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 83789 MLO 1995 12 15 19 41 00 6237-66 P co CCGG 95.130 -999.990 ... R7 1996 02 14 13 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 83792 MLO 1995 12 15 19 41 00 6238-66 P co CCGG 95.940 -999.990 ... R7 1996 02 14 13 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83793 MLO 1996 01 12 20 35 00 6555-66 P co CCGG 132.320 -999.990 ... R7 1996 02 14 12 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 83796 MLO 1996 01 12 20 35 00 6556-66 P co CCGG 131.980 -999.990 ... R7 1996 02 14 12 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 83797 MLO 1996 01 19 20 19 00 6279-66 P co CCGG 88.610 -999.990 ... R7 1996 02 16 10 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 83800 MLO 1996 01 19 20 19 00 6280-66 P co CCGG 87.410 -999.990 ... R7 1996 02 16 10 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 83801 MLO 1996 02 02 19 58 00 6929-66 P co CCGG 95.040 -999.990 ... R7 1996 02 16 08 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 83804 MLO 1996 02 02 19 58 00 6930-66 P co CCGG 96.490 -999.990 ... R7 1996 02 16 08 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 83805 MLO 1996 02 09 19 43 00 6629-66 P co CCGG 122.210 -999.990 ... R7 1996 03 01 09 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 83808 MLO 1996 02 09 19 43 00 6630-66 P co CCGG 121.060 -999.990 ... R7 1996 03 01 09 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 83809 MLO 1996 02 16 19 57 00 6017-66 P co CCGG 88.050 -999.990 ... R7 1996 03 01 10 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83812 MLO 1996 02 16 19 57 00 6018-66 P co CCGG 85.940 -999.990 ... R7 1996 03 01 10 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 83813 MLO 1996 02 23 19 38 00 6835-66 P co CCGG 184.440 -999.990 .X. R7 1996 03 12 16 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83816 MLO 1996 02 23 19 38 00 6836-66 P co CCGG 182.710 -999.990 .X. R7 1996 03 12 16 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 83817 MLO 1996 03 01 19 56 00 6487-66 P co CCGG 133.020 -999.990 P.. R7 1996 03 12 15 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 83820 MLO 1996 03 01 19 56 00 6488-66 P co CCGG 128.880 -999.990 P.. R7 1996 03 12 15 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 83821 MLO 1996 03 08 19 52 00 6413-66 P co CCGG 118.560 -999.990 ... R7 1996 03 22 14 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 83824 MLO 1996 03 08 19 52 00 6414-66 P co CCGG 115.810 -999.990 ... R7 1996 03 22 14 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 83825 MLO 1996 03 15 19 47 00 6205-66 P co CCGG 94.580 -999.990 ... R7 1996 03 22 14 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 83828 MLO 1996 03 15 19 47 00 6206-66 P co CCGG 93.510 -999.990 ... R7 1996 03 22 15 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 83829 MLO 1996 03 22 19 38 00 6789-66 P co CCGG 182.610 -999.990 P.. R7 1996 04 08 09 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 83832 MLO 1996 03 22 19 38 00 6790-66 P co CCGG 178.400 -999.990 P.. R7 1996 04 08 09 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 83833 MLO 1996 03 29 19 55 00 6527-66 P co CCGG 111.380 -999.990 ... R7 1996 04 08 09 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 83836 MLO 1996 03 29 19 55 00 6528-66 P co CCGG 113.020 -999.990 ... R7 1996 04 08 09 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 83837 MLO 1996 04 05 22 45 00 6421-66 P co CCGG 106.770 -999.990 P.. R7 1996 04 15 15 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 83840 MLO 1996 04 05 22 45 00 6422-66 P co CCGG 101.100 -999.990 P.. R7 1996 04 15 16 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 83841 MLO 1996 04 12 19 50 00 6281-66 P co CCGG 117.190 -999.990 ... R7 1996 04 15 15 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 83844 MLO 1996 04 12 19 50 00 6282-66 P co CCGG 117.750 -999.990 ... R7 1996 04 15 15 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 83845 MLO 1996 04 19 19 33 00 6781-66 P co CCGG 103.880 -999.990 ... R7 1996 05 03 14 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 83848 MLO 1996 04 19 19 33 00 6782-66 P co CCGG 102.650 -999.990 ... R7 1996 05 03 14 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 83849 MLO 1996 04 26 19 53 00 6697-66 P co CCGG 122.400 -999.990 P.. R7 1996 05 03 13 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 83852 MLO 1996 04 26 19 53 00 6698-66 P co CCGG 117.840 -999.990 P.. R7 1996 05 03 13 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83853 MLO 1996 05 03 19 46 00 6809-66 P co CCGG 90.830 -999.990 ... R7 1996 05 16 09 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 83856 MLO 1996 05 03 19 46 00 6810-66 P co CCGG 89.120 -999.990 ... R7 1996 05 16 09 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 83857 MLO 1996 05 10 19 41 00 6605-66 P co CCGG 115.770 -999.990 ... R7 1996 05 16 11 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 83860 MLO 1996 05 10 19 41 00 6606-66 P co CCGG 115.380 -999.990 ... R7 1996 05 16 11 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 83861 MLO 1996 05 17 19 43 00 6895-66 P co CCGG 103.670 -999.990 P.. R7 1996 05 31 10 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 83864 MLO 1996 05 17 19 43 00 6896-66 P co CCGG 99.740 -999.990 P.. R7 1996 05 31 10 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 83865 MLO 1996 05 24 19 38 00 6899-66 P co CCGG 96.100 -999.990 ... R7 1996 05 31 09 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 83868 MLO 1996 05 24 19 38 00 6900-66 P co CCGG 93.640 -999.990 ... R7 1996 05 31 09 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 83869 MLO 1996 05 31 19 44 00 6757-66 P co CCGG 73.690 -999.990 ... R7 1996 06 13 12 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 83872 MLO 1996 05 31 19 44 00 6758-66 P co CCGG 72.080 -999.990 ... R7 1996 06 13 12 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83873 MLO 1996 06 07 19 42 00 6539-66 P co CCGG 99.270 -999.990 ... R7 1996 06 13 12 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 83876 MLO 1996 06 07 19 42 00 6540-66 P co CCGG 97.670 -999.990 ... R7 1996 06 13 13 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 83877 MLO 1996 06 14 19 35 00 6053-66 P co CCGG 89.120 -999.990 ... R7 1996 07 02 10 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 83880 MLO 1996 06 14 19 35 00 6054-66 P co CCGG 89.590 -999.990 ... R7 1996 07 02 11 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83881 MLO 1996 06 21 19 47 00 6091-66 P co CCGG 92.110 -999.990 ... R7 1996 07 02 09 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 83884 MLO 1996 06 21 19 47 00 6092-66 P co CCGG 90.200 -999.990 ... R7 1996 07 02 09 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 83885 MLO 1996 06 28 19 42 00 6329-66 P co CCGG 76.630 -999.990 ... R7 1996 07 15 12 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 83888 MLO 1996 06 28 19 42 00 6330-66 P co CCGG 77.440 -999.990 ... R7 1996 07 15 12 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 83889 MLO 1996 07 05 19 48 00 6923-66 P co CCGG 78.270 -999.990 ... R7 1996 07 15 12 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 83892 MLO 1996 07 05 19 48 00 6924-66 P co CCGG 77.570 -999.990 ... R7 1996 07 15 12 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 83893 MLO 1996 07 12 19 40 00 6263-66 P co CCGG 81.560 -999.990 ... R7 1996 08 14 16 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 83896 MLO 1996 07 12 19 40 00 6264-66 P co CCGG 80.030 -999.990 ... R7 1996 08 14 16 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 83897 MLO 1996 07 19 19 38 00 6129-66 P co CCGG 74.670 -999.990 P.. R7 1996 08 14 15 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 83900 MLO 1996 07 19 19 38 00 6130-66 P co CCGG 71.770 -999.990 P.. R7 1996 08 14 15 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 83901 MLO 1996 07 26 19 38 00 6053-66 P co CCGG 66.200 -999.990 ... R7 1996 08 09 16 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 83902 MLO 1996 07 26 19 38 00 6054-66 P co CCGG 65.100 -999.990 ... R7 1996 08 09 17 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 83903 MLO 1996 08 02 20 08 00 6091-66 P co CCGG 78.160 -999.990 ... R7 1996 08 09 17 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 83908 MLO 1996 08 02 20 08 00 6092-66 P co CCGG 77.180 -999.990 ... R7 1996 08 09 17 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 83909 MLO 1996 08 09 19 41 00 6549-66 P co CCGG 70.650 -999.990 P.. R7 1996 09 10 12 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 83912 MLO 1996 08 09 19 41 00 6550-66 P co CCGG 67.630 -999.990 P.. R7 1996 09 10 12 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 83913 MLO 1996 08 16 19 55 00 6593-66 P co CCGG 72.450 -999.990 P.. R7 1996 09 10 09 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 83914 MLO 1996 08 16 19 55 00 6594-66 P co CCGG 213.070 -999.990 P.. R7 1996 09 10 09 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 83915 MLO 1996 08 23 19 53 00 6681-66 P co CCGG 68.610 -999.990 ... R7 1996 09 05 09 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 83920 MLO 1996 08 23 19 53 00 6682-66 P co CCGG 67.600 -999.990 ... R7 1996 09 05 09 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 83921 MLO 1996 08 30 19 32 00 6571-66 P co CCGG 67.960 -999.990 ... R7 1996 09 05 13 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83924 MLO 1996 08 30 19 32 00 6572-66 P co CCGG 66.450 -999.990 ... R7 1996 09 05 13 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 83925 MLO 1996 09 06 19 38 00 6629-66 P co CCGG 84.190 -999.990 P.. R7 1996 09 19 10 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 83928 MLO 1996 09 06 19 38 00 6630-66 P co CCGG 81.360 -999.990 P.. R7 1996 09 19 10 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 83929 MLO 1996 09 13 19 41 00 6735-66 P co CCGG 84.760 -999.990 ... R7 1996 09 19 11 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 83932 MLO 1996 09 13 19 41 00 6736-66 P co CCGG 83.430 -999.990 ... R7 1996 09 19 11 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 83933 MLO 1996 09 20 19 49 00 6039-66 P co CCGG 89.020 -999.990 ... R7 1996 10 18 09 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 83936 MLO 1996 09 20 19 49 00 6040-66 P co CCGG 86.480 -999.990 ... R7 1996 10 18 09 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 83937 MLO 1996 09 27 20 09 00 6317-66 P co CCGG 100.720 -999.990 P.. R7 1996 10 18 10 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 83940 MLO 1996 09 27 20 09 00 6318-66 P co CCGG 95.700 -999.990 P.. R7 1996 10 18 11 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 83941 MLO 1996 10 04 19 45 00 6801-66 P co CCGG 75.790 -999.990 ... R7 1996 10 18 08 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 83944 MLO 1996 10 04 19 45 00 6802-66 P co CCGG 73.150 -999.990 ... R7 1996 10 18 08 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 83945 MLO 1996 10 11 19 24 00 6013-66 P co CCGG 87.720 -999.990 ... R7 1996 10 18 11 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 83946 MLO 1996 10 11 19 24 00 6014-66 P co CCGG 86.240 -999.990 ... R7 1996 10 18 11 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 83947 MLO 1996 10 18 19 48 00 6061-66 P co CCGG 79.310 -999.990 ... R7 1996 11 01 13 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 83952 MLO 1996 10 18 19 48 00 6062-66 P co CCGG 78.410 -999.990 ... R7 1996 11 01 13 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 83953 MLO 1996 10 25 19 44 00 6001-66 P co CCGG 88.440 -999.990 P.. R7 1996 11 01 11 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 83956 MLO 1996 10 25 19 44 00 6002-66 P co CCGG 85.380 -999.990 P.. R7 1996 11 01 12 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 83957 MLO 1996 11 01 20 08 00 6921-66 P co CCGG 81.770 -999.990 ... R7 1996 11 18 11 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 83958 MLO 1996 11 01 20 08 00 6922-66 P co CCGG 80.980 -999.990 ... R7 1996 11 18 11 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 83959 MLO 1996 11 08 19 43 00 6657-66 P co CCGG 76.620 -999.990 ... R7 1996 11 18 10 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 83964 MLO 1996 11 08 19 43 00 6658-66 P co CCGG 74.130 -999.990 ... R7 1996 11 18 10 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 83965 MLO 1996 11 15 19 43 00 6685-66 P co CCGG 76.990 -999.990 ... R7 1996 11 26 16 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 83968 MLO 1996 11 15 19 43 00 6686-66 P co CCGG 76.890 -999.990 ... R7 1996 11 26 17 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 83969 MLO 1996 11 22 19 39 00 6111-66 P co CCGG 95.980 -999.990 ... R7 1996 11 26 15 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 83972 MLO 1996 11 22 19 39 00 6112-66 P co CCGG 95.570 -999.990 ... R7 1996 11 26 15 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 83973 MLO 1996 11 29 19 47 00 6085-66 P co CCGG 94.240 -999.990 ... R7 1996 12 18 09 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 83976 MLO 1996 11 29 19 47 00 6086-66 P co CCGG 94.850 -999.990 ... R7 1996 12 18 09 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 83977 MLO 1996 12 06 20 07 00 6893-66 P co CCGG 97.890 -999.990 ... R7 1996 12 18 10 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 83980 MLO 1996 12 06 20 07 00 6894-66 P co CCGG 97.760 -999.990 ... R7 1996 12 18 10 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 83981 MLO 1996 12 13 19 53 00 6023-66 P co CCGG 99.770 -999.990 ... R7 1997 01 02 14 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 83984 MLO 1996 12 13 19 53 00 6024-66 P co CCGG 99.450 -999.990 ... R7 1997 01 02 14 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83985 MLO 1996 12 20 20 07 00 6567-66 P co CCGG 103.840 -999.990 ... R7 1997 01 02 14 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 83988 MLO 1996 12 20 20 07 00 6568-66 P co CCGG 103.470 -999.990 ... R7 1997 01 02 15 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 83989 MLO 1997 01 03 20 08 00 6217-66 P co CCGG 84.310 -999.990 ... R7 1997 01 15 12 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 83994 MLO 1997 01 03 20 08 00 6218-66 P co CCGG 83.890 -999.990 ... R7 1997 01 15 12 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 83995 MLO 1997 01 10 20 17 00 6795-66 P co CCGG 96.410 -999.990 ... R7 1997 01 15 11 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 83998 MLO 1997 01 10 20 17 00 6796-66 P co CCGG 96.040 -999.990 ... R7 1997 01 15 12 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 83999 MLO 1997 01 17 19 49 00 6923-66 P co CCGG 103.830 -999.990 P.. R7 1997 02 07 14 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 84002 MLO 1997 01 17 19 49 00 6924-66 P co CCGG 100.660 -999.990 P.. R7 1997 02 07 14 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 84003 MLO 1997 01 24 20 01 00 6193-66 P co CCGG 120.900 -999.990 ... R7 1997 02 07 15 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 84006 MLO 1997 01 24 20 01 00 6194-66 P co CCGG 119.240 -999.990 ... R7 1997 02 07 15 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 84007 MLO 1997 01 31 20 02 00 6085-66 P co CCGG 95.830 -999.990 ... R7 1997 03 20 08 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 84010 MLO 1997 01 31 20 02 00 6086-66 P co CCGG 94.540 -999.990 ... R7 1997 03 20 09 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 84011 MLO 1997 02 07 19 46 00 6317-66 P co CCGG 109.200 -999.990 ... R7 1997 02 25 11 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 84014 MLO 1997 02 07 19 46 00 6318-66 P co CCGG 107.540 -999.990 ... R7 1997 02 25 12 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 84015 MLO 1997 02 14 19 46 00 6341-66 P co CCGG 117.550 -999.990 ... R7 1997 02 25 11 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 84018 MLO 1997 02 14 19 46 00 6342-66 P co CCGG 116.730 -999.990 ... R7 1997 02 25 11 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 84019 MLO 1997 02 21 19 39 00 6583-66 P co CCGG 130.780 -999.990 ... R7 1997 03 20 09 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 84022 MLO 1997 02 21 19 39 00 6584-66 P co CCGG 131.330 -999.990 ... R7 1997 03 20 09 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 84023 MLO 1997 02 28 20 21 00 6781-66 P co CCGG 96.040 -999.990 ... R7 1997 04 02 11 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 84024 MLO 1997 03 07 19 54 00 6025-66 P co CCGG 116.190 -999.990 ... R7 1997 03 31 13 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 84029 MLO 1997 03 07 19 54 00 6026-66 P co CCGG 117.080 -999.990 ... R7 1997 03 31 13 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 84030 MLO 1997 03 14 19 48 00 6929-66 P co CCGG 93.570 -999.990 ... R7 1997 04 02 11 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 84033 MLO 1997 03 14 19 48 00 6930-66 P co CCGG 92.550 -999.990 ... R7 1997 04 02 12 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 84034 MLO 1997 03 21 19 51 00 6279-66 P co CCGG 155.550 -999.990 .X. R7 1997 04 02 12 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 84037 MLO 1997 03 28 19 40 00 6895-66 P co CCGG 126.350 -999.990 ... R7 1997 04 28 12 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 84040 MLO 1997 03 28 19 40 00 6896-66 P co CCGG 126.860 -999.990 ... R7 1997 04 28 12 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 84041 MLO 1997 04 04 19 40 00 6443-66 P co CCGG 130.130 -999.990 ... R7 1997 04 28 12 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 84044 MLO 1997 04 04 19 40 00 6444-66 P co CCGG 127.780 -999.990 ... R7 1997 04 28 12 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 84045 MLO 1997 04 11 19 47 00 6147-66 P co CCGG 177.040 -999.990 .X. R7 1997 04 28 10 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 84048 MLO 1997 04 11 19 47 00 6148-66 P co CCGG 175.290 -999.990 .X. R7 1997 04 28 10 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 84049 MLO 1997 04 18 19 58 00 6157-66 P co CCGG 173.910 -999.990 .X. R7 1997 04 28 10 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 84052 MLO 1997 04 18 19 58 00 6158-66 P co CCGG 174.490 -999.990 .X. R7 1997 04 28 11 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 84053 MLO 1997 04 25 20 09 00 6011-66 P co CCGG 136.160 -999.990 P.. R7 1997 05 14 14 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 84056 MLO 1997 04 25 20 09 00 6012-66 P co CCGG 131.140 -999.990 P.. R7 1997 05 14 14 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 84057 MLO 1997 05 02 19 39 00 6923-66 P co CCGG 114.070 -999.990 ... R7 1997 05 14 15 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 84060 MLO 1997 05 02 19 39 00 6924-66 P co CCGG 113.420 -999.990 ... R7 1997 05 14 15 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 84061 MLO 1997 05 09 19 26 00 2156-66 S co CCGG 117.090 -999.990 S.. R5 1997 05 30 10 58 00 19.5300 -155.5800 3437.00 3397.00 40.00 84063 MLO 1997 05 09 19 40 00 6023-66 P co CCGG 115.290 -999.990 ... R7 1997 05 29 10 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 84064 MLO 1997 05 09 19 40 00 6024-66 P co CCGG 109.160 -999.990 Z.. R5 1997 05 30 11 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 84065 MLO 1997 05 09 19 40 00 6024-66 P co CCGG 115.450 -999.990 Z.. R7 1997 05 29 10 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 84065 MLO 1997 05 16 19 42 00 2346-66 S co CCGG 109.850 -999.990 S.. R5 1997 05 30 11 12 00 19.5300 -155.5800 3437.00 3397.00 40.00 84067 MLO 1997 05 16 20 03 00 6461-66 P co CCGG 117.710 -999.990 ... R7 1997 05 29 09 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 84068 MLO 1997 05 16 20 03 00 6462-66 P co CCGG 112.950 -999.990 Z.. R5 1997 05 30 11 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 84069 MLO 1997 05 16 20 03 00 6462-66 P co CCGG 116.810 -999.990 Z.. R7 1997 05 29 09 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 84069 MLO 1997 05 23 19 28 00 2267-66 S co CCGG 210.770 -999.990 S.. R5 1997 07 03 14 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84070 MLO 1997 05 23 19 28 00 2268-66 S co CCGG 104.540 -999.990 S.. R5 1997 07 03 14 27 00 19.5300 -155.5800 3437.00 3397.00 40.00 84071 MLO 1997 05 23 19 42 00 6375-66 P co CCGG 98.580 -999.990 ... R7 1997 06 11 10 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 84072 MLO 1997 05 23 19 42 00 6376-66 P co CCGG 101.960 -999.990 Z.. R5 1997 06 11 12 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 84073 MLO 1997 05 23 19 42 00 6376-66 P co CCGG 98.420 -999.990 Z.. R7 1997 06 11 10 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 84073 MLO 1997 05 30 19 29 00 2309-66 S co CCGG 89.010 -999.990 S.. R5 1997 07 03 13 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 84074 MLO 1997 05 30 19 29 00 2310-66 S co CCGG 89.900 -999.990 S.. R5 1997 07 03 14 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84075 MLO 1997 05 30 19 47 00 6817-66 P co CCGG 95.490 -999.990 ... R5 1997 06 11 12 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 84076 MLO 1997 05 30 19 47 00 6817-66 P co CCGG 94.330 -999.990 ... R7 1997 06 11 11 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 84076 MLO 1997 06 06 19 29 00 2275-66 S co CCGG 104.190 -999.990 S.. R5 1997 06 18 12 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 84077 MLO 1997 06 06 19 29 00 2276-66 S co CCGG 103.670 -999.990 S.. R5 1997 06 18 12 47 00 19.5300 -155.5800 3437.00 3397.00 40.00 84078 MLO 1997 06 06 19 56 00 6533-66 P co CCGG 110.480 -999.990 ... R7 1997 06 23 09 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 84079 MLO 1997 06 06 19 56 00 6534-66 P co CCGG 108.140 -999.990 ... R5 1997 06 23 13 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 84080 MLO 1997 06 06 19 56 00 6534-66 P co CCGG 108.550 -999.990 ... R7 1997 06 23 09 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 84080 MLO 1997 06 13 19 24 00 2333-66 S co CCGG 161.230 -999.990 S.. R5 1997 06 18 13 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84081 MLO 1997 06 13 19 24 00 2334-66 S co CCGG 120.520 -999.990 S.. R5 1997 06 18 13 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84082 MLO 1997 06 13 19 51 00 6735-66 P co CCGG 120.080 -999.990 ... R7 1997 06 23 09 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 84083 MLO 1997 06 13 19 51 00 6736-66 P co CCGG 117.900 -999.990 ... R5 1997 06 23 14 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 84084 MLO 1997 06 13 19 51 00 6736-66 P co CCGG 117.230 -999.990 ... R7 1997 06 23 09 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 84084 MLO 1997 06 20 19 34 00 6247-66 P co CCGG 83.170 -999.990 ... R7 1997 07 08 17 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 84085 MLO 1997 06 20 19 34 00 6248-66 P co CCGG 85.460 -999.990 ... R5 1997 07 09 12 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 84086 MLO 1997 06 20 19 34 00 6248-66 P co CCGG 83.870 -999.990 ... R7 1997 07 08 17 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 84086 MLO 1997 06 20 19 46 00 2103-91 S co CCGG 78.780 -999.990 S.. R5 1997 07 03 13 07 00 19.5300 -155.5800 3437.00 3397.00 40.00 84087 MLO 1997 06 20 19 46 00 2104-91 S co CCGG 109.910 -999.990 S.. R5 1997 07 03 13 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 84088 MLO 1997 06 27 19 25 00 2105-91 S co CCGG 80.440 -999.990 S.. R5 1997 07 03 10 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 84089 MLO 1997 06 27 19 25 00 2106-91 S co CCGG 79.520 -999.990 S.. R5 1997 07 03 10 53 00 19.5300 -155.5800 3437.00 3397.00 40.00 84090 MLO 1997 06 27 19 54 00 6015-66 P co CCGG 87.850 -999.990 ... R7 1997 07 08 16 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 84091 MLO 1997 06 27 19 54 00 6016-66 P co CCGG 87.720 -999.990 ... R5 1997 07 09 13 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 84092 MLO 1997 06 27 19 54 00 6016-66 P co CCGG 85.700 -999.990 ... R7 1997 07 08 17 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 84092 MLO 1997 07 03 19 42 00 2131-66 S co CCGG 77.860 -999.990 S.. R5 1997 07 14 16 16 00 19.5300 -155.5800 3437.00 3397.00 40.00 84093 MLO 1997 07 03 19 42 00 2132-66 S co CCGG 81.770 -999.990 S.. R5 1997 07 14 16 30 00 19.5300 -155.5800 3437.00 3397.00 40.00 84094 MLO 1997 07 03 19 58 00 6013-66 P co CCGG 80.870 -999.990 *.. R7 1997 07 21 13 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 84095 MLO 1997 07 03 19 58 00 6014-66 P co CCGG 83.280 -999.990 ... R5 1997 07 23 15 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 84096 MLO 1997 07 03 19 58 00 6014-66 P co CCGG 80.670 -999.990 *.. R7 1997 07 21 14 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 84096 MLO 1997 07 11 19 18 00 2269-66 S co CCGG 62.760 -999.990 S.. R5 1997 07 14 15 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 84097 MLO 1997 07 11 19 18 00 2270-66 S co CCGG 179.320 -999.990 S.. R5 1997 07 14 16 03 00 19.5300 -155.5800 3437.00 3397.00 40.00 84098 MLO 1997 07 11 19 40 00 6835-66 P co CCGG 72.510 -999.990 *.. R7 1997 07 21 13 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84099 MLO 1997 07 11 19 40 00 6836-66 P co CCGG 71.150 -999.990 ... R5 1997 07 23 15 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 84100 MLO 1997 07 11 19 40 00 6836-66 P co CCGG 69.830 -999.990 *.. R7 1997 07 21 13 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 84100 MLO 1997 07 18 19 21 00 2241-66 S co CCGG 80.230 -999.990 S.. R5 1997 08 06 09 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 84101 MLO 1997 07 18 19 21 00 2242-66 S co CCGG 78.130 -999.990 S.. R5 1997 08 06 10 09 00 19.5300 -155.5800 3437.00 3397.00 40.00 84102 MLO 1997 07 18 19 38 00 6039-66 P co CCGG 78.380 -999.990 *.. R7 1997 08 04 12 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 84103 MLO 1997 07 18 19 38 00 6040-66 P co CCGG 77.020 -999.990 *.. R7 1997 08 04 12 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84104 MLO 1997 07 25 19 18 00 2105-66 S co CCGG 88.550 -999.990 S.. R5 1997 08 06 09 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 84105 MLO 1997 07 25 19 18 00 2106-66 S co CCGG 86.630 -999.990 S.. R5 1997 08 06 09 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 84106 MLO 1997 07 25 19 38 00 6077-66 P co CCGG 84.180 -999.990 *.. R7 1997 08 04 12 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 84107 MLO 1997 07 25 19 38 00 6078-66 P co CCGG 83.860 -999.990 *.. R7 1997 08 04 12 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 84108 MLO 1997 08 01 19 38 00 2003-66 S co CCGG 67.750 -999.990 S.. R5 1997 09 02 13 25 00 19.5300 -155.5800 3437.00 3397.00 40.00 84109 MLO 1997 08 01 19 38 00 2004-66 S co CCGG 65.090 -999.990 S.. R5 1997 09 02 13 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 84110 MLO 1997 08 01 20 00 00 6111-66 P co CCGG 67.010 -999.990 ... R5 1997 08 18 10 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84111 MLO 1997 08 01 20 00 00 6112-66 P co CCGG 69.790 -999.990 ... R5 1997 08 18 10 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 84112 MLO 1997 08 08 19 28 00 2209-66 S co CCGG 65.230 -999.990 S.. R5 1997 09 02 14 03 00 19.5300 -155.5800 3437.00 3397.00 40.00 84113 MLO 1997 08 08 19 28 00 2210-66 S co CCGG 64.230 -999.990 S.. R5 1997 09 02 14 17 00 19.5300 -155.5800 3437.00 3397.00 40.00 84114 MLO 1997 08 08 19 51 00 6265-66 P co CCGG 73.580 -999.990 ... R5 1997 08 18 10 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 84115 MLO 1997 08 08 19 51 00 6266-66 P co CCGG 71.530 -999.990 ... R5 1997 08 18 10 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 84116 MLO 1997 08 15 19 40 00 2333-66 S co CCGG 63.020 -999.990 S.. R5 1997 09 02 12 58 00 19.5300 -155.5800 3437.00 3397.00 40.00 84117 MLO 1997 08 15 19 40 00 2334-66 S co CCGG 62.510 -999.990 S.. R5 1997 09 02 13 11 00 19.5300 -155.5800 3437.00 3397.00 40.00 84118 MLO 1997 08 15 19 58 00 6011-66 P co CCGG 64.660 -999.990 ... R5 1997 09 02 11 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 84119 MLO 1997 08 15 19 58 00 6012-66 P co CCGG 63.630 -999.990 ... R5 1997 09 02 11 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 84120 MLO 1997 08 22 19 28 00 2307-66 S co CCGG 77.890 -999.990 S.. R5 1997 09 02 12 30 00 19.5300 -155.5800 3437.00 3397.00 40.00 84121 MLO 1997 08 22 19 28 00 2308-66 S co CCGG 79.670 -999.990 S.. R5 1997 09 02 12 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 84122 MLO 1997 08 22 19 44 00 6795-66 P co CCGG 81.330 -999.990 ... R5 1997 09 02 10 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 84123 MLO 1997 08 22 19 44 00 6796-66 P co CCGG 80.830 -999.990 ... R5 1997 09 02 10 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 84124 MLO 1997 08 29 19 20 00 2169-66 S co CCGG 75.360 -999.990 S.. R5 1997 09 11 11 05 00 19.5300 -155.5800 3437.00 3397.00 40.00 84125 MLO 1997 08 29 19 20 00 2170-66 S co CCGG 77.700 -999.990 S.. R5 1997 09 11 11 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 84126 MLO 1997 08 29 19 35 00 6837-66 P co CCGG 81.110 -999.990 ... R5 1997 09 10 09 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 84127 MLO 1997 08 29 19 35 00 6838-66 P co CCGG 79.490 -999.990 ... R5 1997 09 10 10 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 84128 MLO 1997 09 05 19 28 00 2345-66 S co CCGG 72.460 -999.990 S.. R5 1997 09 11 12 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84129 MLO 1997 09 05 19 28 00 2346-66 S co CCGG 70.370 -999.990 S.. R5 1997 09 11 12 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84130 MLO 1997 09 05 19 48 00 6379-66 P co CCGG 75.800 -999.990 ... R5 1997 09 10 09 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 84131 MLO 1997 09 05 19 48 00 6380-66 P co CCGG 76.110 -999.990 ... R5 1997 09 10 09 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 84132 MLO 1997 09 12 19 35 00 2297-66 S co CCGG 83.030 -999.990 S.. R5 1997 10 09 12 25 00 19.5300 -155.5800 3437.00 3397.00 40.00 84133 MLO 1997 09 12 19 50 00 6887-66 P co CCGG 88.940 -999.990 ... R5 1997 10 10 08 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 84134 MLO 1997 09 12 19 50 00 6888-66 P co CCGG 86.720 -999.990 ... R5 1997 10 10 09 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 84135 MLO 1997 09 26 19 30 00 2107-66 S co CCGG 104.180 -999.990 S.. R5 1997 10 09 10 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84136 MLO 1997 09 26 19 30 00 2108-66 S co CCGG 102.430 -999.990 S.. R5 1997 10 09 10 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84137 MLO 1997 09 26 19 48 00 6481-66 P co CCGG 106.580 -999.990 ... R5 1997 10 10 08 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 84138 MLO 1997 09 26 19 48 00 6482-66 P co CCGG 106.590 -999.990 ... R5 1997 10 10 08 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 84139 MLO 1997 10 03 19 27 00 2015-66 S co CCGG 83.490 -999.990 S.. R5 1997 10 21 10 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84140 MLO 1997 10 03 19 27 00 2016-66 S co CCGG 83.370 -999.990 S.. R5 1997 10 21 10 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84141 MLO 1997 10 03 19 48 00 6903-66 P co CCGG 88.070 -999.990 ... R5 1997 10 22 09 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 84142 MLO 1997 10 03 19 48 00 6904-66 P co CCGG 87.400 -999.990 ... R5 1997 10 22 10 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 84143 MLO 1997 10 10 19 40 00 2153-66 S co CCGG 80.800 -999.990 S.. R5 1997 10 23 13 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 84144 MLO 1997 10 10 19 40 00 2154-66 S co CCGG 78.260 -999.990 S.. R5 1997 10 23 13 42 00 19.5300 -155.5800 3437.00 3397.00 40.00 84145 MLO 1997 10 10 19 58 00 6307-66 P co CCGG 80.050 -999.990 ... R5 1997 10 22 09 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 84146 MLO 1997 10 10 19 58 00 6308-66 P co CCGG 81.570 -999.990 ... R5 1997 10 22 09 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 84147 MLO 1997 10 17 19 37 00 2055-66 S co CCGG 120.300 -999.990 S.. R5 1997 11 14 10 57 00 19.5300 -155.5800 3437.00 3397.00 40.00 84148 MLO 1997 10 17 19 37 00 2056-66 S co CCGG 120.690 -999.990 S.. R5 1997 11 14 11 10 00 19.5300 -155.5800 3437.00 3397.00 40.00 84149 MLO 1997 10 17 19 54 00 6529-66 P co CCGG 120.140 -999.990 ... R5 1997 11 04 15 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 84150 MLO 1997 10 17 19 54 00 6530-66 P co CCGG 118.850 -999.990 ... R5 1997 11 04 15 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 84151 MLO 1997 10 24 19 41 00 2269-66 S co CCGG 110.990 -999.990 S.. R5 1997 11 13 14 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84152 MLO 1997 10 24 19 41 00 2270-66 S co CCGG 111.910 -999.990 S.. R5 1997 11 13 14 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84153 MLO 1997 10 24 19 58 00 6365-66 P co CCGG 117.780 -999.990 P.. R5 1997 11 04 15 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 84154 MLO 1997 10 24 19 58 00 6366-66 P co CCGG 114.840 -999.990 P.. R5 1997 11 04 16 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 84155 MLO 1997 10 31 19 37 00 2019-66 S co CCGG 102.150 -999.990 S.. R5 1997 11 18 11 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 84156 MLO 1997 10 31 19 37 00 2020-66 S co CCGG 104.260 -999.990 S.. R5 1997 11 18 11 32 00 19.5300 -155.5800 3437.00 3397.00 40.00 84157 MLO 1997 10 31 19 56 00 6479-66 P co CCGG 105.800 -999.990 P.. R5 1997 11 14 11 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 84158 MLO 1997 10 31 19 56 00 6480-66 P co CCGG 102.770 -999.990 P.. R5 1997 11 14 12 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 84159 MLO 1997 11 07 19 37 00 2365-66 S co CCGG 107.130 -999.990 S.. R5 1997 11 18 11 47 00 19.5300 -155.5800 3437.00 3397.00 40.00 84160 MLO 1997 11 07 19 37 00 2366-66 S co CCGG 106.060 -999.990 S.. R5 1997 11 18 12 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84161 MLO 1997 11 07 19 50 00 6155-66 P co CCGG 112.120 -999.990 ... R5 1997 11 14 14 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 84162 MLO 1997 11 07 19 50 00 6156-66 P co CCGG 112.030 -999.990 ... R5 1997 11 14 14 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 84163 MLO 1997 11 14 19 29 00 2257-66 S co CCGG 98.510 -999.990 S.. R5 1997 12 02 09 32 00 19.5300 -155.5800 3437.00 3397.00 40.00 84164 MLO 1997 11 14 19 29 00 2258-66 S co CCGG 98.780 -999.990 S.. R5 1997 12 02 09 45 00 19.5300 -155.5800 3437.00 3397.00 40.00 84165 MLO 1997 11 14 19 46 00 6835-66 P co CCGG 105.640 -999.990 ... R5 1997 12 04 10 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 84166 MLO 1997 11 14 19 46 00 6836-66 P co CCGG 103.710 -999.990 ... R5 1997 12 04 10 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 84167 MLO 1997 11 21 19 26 00 2213-66 S co CCGG 135.870 -999.990 S.. R5 1997 12 02 11 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 84168 MLO 1997 11 21 19 26 00 2214-66 S co CCGG 135.480 -999.990 S.. R5 1997 12 02 11 34 00 19.5300 -155.5800 3437.00 3397.00 40.00 84169 MLO 1997 11 21 19 48 00 6091-66 P co CCGG 141.440 -999.990 ... R5 1997 12 04 13 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 84170 MLO 1997 11 21 19 48 00 6092-66 P co CCGG 139.130 -999.990 ... R5 1997 12 04 14 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 84171 MLO 1997 11 28 19 28 00 2225-66 S co CCGG 114.090 -999.990 S.. R5 1997 12 16 15 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 84172 MLO 1997 11 28 19 28 00 2226-66 S co CCGG 115.860 -999.990 S.. R5 1997 12 16 15 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 84173 MLO 1997 11 28 19 42 00 4525-91 P co CCGG 113.080 -999.990 ... R5 1997 12 16 09 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 84174 MLO 1997 11 28 19 42 00 4526-91 P co CCGG 113.260 -999.990 ... R5 1997 12 16 10 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 84175 MLO 1997 12 05 19 28 00 2345-66 S co CCGG 133.230 -999.990 S.. R5 1997 12 16 14 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 84176 MLO 1997 12 05 19 28 00 2346-66 S co CCGG 131.870 -999.990 S.. R5 1997 12 16 15 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 84177 MLO 1997 12 05 19 45 00 845-91 P co CCGG 128.230 -999.990 ... R5 1997 12 16 10 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 84178 MLO 1997 12 05 19 45 00 846-91 P co CCGG 127.990 -999.990 ... R5 1997 12 16 10 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 84179 MLO 1997 12 12 19 34 00 2183-66 S co CCGG 128.530 -999.990 S.. R5 1998 01 15 12 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84180 MLO 1997 12 12 19 34 00 2184-66 S co CCGG 129.110 -999.990 S.. R5 1998 01 15 12 27 00 19.5300 -155.5800 3437.00 3397.00 40.00 84181 MLO 1997 12 12 19 47 00 6313-66 P co CCGG 125.770 -999.990 ... R5 1998 01 12 10 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 84182 MLO 1997 12 12 19 47 00 6314-66 P co CCGG 124.570 -999.990 ... R5 1998 01 12 11 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 84183 MLO 1997 12 19 19 30 00 2017-66 S co CCGG 119.810 -999.990 S.. R5 1998 01 15 11 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 84184 MLO 1997 12 19 19 30 00 2018-66 S co CCGG 120.370 -999.990 S.. R5 1998 01 15 11 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 84185 MLO 1997 12 19 19 50 00 6255-66 P co CCGG 121.240 -999.990 ... R5 1998 01 12 12 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 84186 MLO 1997 12 19 19 50 00 6256-66 P co CCGG 119.940 -999.990 ... R5 1998 01 12 13 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 84187 MLO 1998 01 02 19 33 00 2131-66 S co CCGG 120.870 -999.990 S.. R5 1998 01 15 10 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 84188 MLO 1998 01 02 19 33 00 2132-66 S co CCGG 122.430 -999.990 S.. R5 1998 01 15 11 03 00 19.5300 -155.5800 3437.00 3397.00 40.00 84189 MLO 1998 01 02 19 47 00 6333-66 P co CCGG 124.670 -999.990 ... R5 1998 01 20 13 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 84190 MLO 1998 01 02 19 47 00 6334-66 P co CCGG 123.770 -999.990 ... R5 1998 01 20 13 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84191 MLO 1998 01 09 19 32 00 2153-66 S co CCGG 104.510 -999.990 S.. R5 1998 01 15 09 53 00 19.5300 -155.5800 3437.00 3397.00 40.00 84192 MLO 1998 01 09 19 32 00 2154-66 S co CCGG 241.190 -999.990 S.C R5 1998 01 15 10 07 00 19.5300 -155.5800 3437.00 3397.00 40.00 84193 MLO 1998 01 09 19 47 00 6211-66 P co CCGG 105.220 -999.990 ... R5 1998 01 16 15 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 84194 MLO 1998 01 09 19 47 00 6212-66 P co CCGG 104.430 -999.990 ... R5 1998 01 16 16 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 84195 MLO 1998 01 16 19 36 00 2053-66 S co CCGG 117.880 -999.990 S.. R5 1998 01 30 10 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 84196 MLO 1998 01 16 19 36 00 2054-66 S co CCGG 117.900 -999.990 S.. R5 1998 01 30 10 18 00 19.5300 -155.5800 3437.00 3397.00 40.00 84197 MLO 1998 01 16 19 53 00 6271-66 P co CCGG 121.900 -999.990 ... R5 1998 01 30 12 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 84198 MLO 1998 01 16 19 53 00 6272-66 P co CCGG 121.650 -999.990 ... R5 1998 01 30 12 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 84199 MLO 1998 01 23 19 28 00 2167-66 S co CCGG 108.040 -999.990 S.. R5 1998 01 30 09 37 00 19.5300 -155.5800 3437.00 3397.00 40.00 84200 MLO 1998 01 23 19 28 00 2168-66 S co CCGG 107.430 -999.990 S.. R5 1998 01 30 09 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 84201 MLO 1998 01 23 19 42 00 6893-66 P co CCGG 111.750 -999.990 P.. R5 1998 01 30 11 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 84202 MLO 1998 01 23 19 42 00 6894-66 P co CCGG 108.810 -999.990 P.. R5 1998 01 30 11 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 84203 MLO 1998 01 30 19 33 00 2093-66 S co CCGG 127.230 -999.990 S.. R5 1998 02 27 15 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 84204 MLO 1998 01 30 19 33 00 2094-66 S co CCGG 127.250 -999.990 S.. R5 1998 02 27 15 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 84205 MLO 1998 01 30 19 53 00 6855-66 P co CCGG 131.380 -999.990 ... R5 1998 02 18 14 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 84206 MLO 1998 01 30 19 53 00 6856-66 P co CCGG 129.880 -999.990 ... R5 1998 02 18 14 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84207 MLO 1998 02 06 19 34 00 2105-66 S co CCGG 119.830 -999.990 S.. R5 1998 03 02 13 16 00 19.5300 -155.5800 3437.00 3397.00 40.00 84208 MLO 1998 02 06 19 34 00 2106-66 S co CCGG 121.040 -999.990 S.. R5 1998 03 02 13 30 00 19.5300 -155.5800 3437.00 3397.00 40.00 84209 MLO 1998 02 06 19 54 00 6907-66 P co CCGG 129.650 -999.990 ... R5 1998 02 18 14 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 84210 MLO 1998 02 06 19 54 00 6908-66 P co CCGG 127.270 -999.990 ... R5 1998 02 18 14 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 84211 MLO 1998 02 13 19 37 00 2365-66 S co CCGG 96.240 -999.990 S.. R5 1998 03 02 15 11 00 19.5300 -155.5800 3437.00 3397.00 40.00 84212 MLO 1998 02 13 19 37 00 2366-66 S co CCGG 95.070 -999.990 S.. R5 1998 03 02 15 25 00 19.5300 -155.5800 3437.00 3397.00 40.00 84213 MLO 1998 02 13 20 15 00 6365-66 P co CCGG 99.360 -999.990 ... R5 1998 02 27 10 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 84214 MLO 1998 02 13 20 15 00 6366-66 P co CCGG 98.530 -999.990 ... R5 1998 02 27 10 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 84215 MLO 1998 02 20 19 31 00 2019-66 S co CCGG 102.120 -999.990 S.. R5 1998 03 02 15 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 84216 MLO 1998 02 20 19 31 00 2020-66 S co CCGG 102.880 -999.990 S.. R5 1998 03 02 15 52 00 19.5300 -155.5800 3437.00 3397.00 40.00 84217 MLO 1998 02 20 19 46 00 6395-66 P co CCGG 105.990 -999.990 ... R5 1998 02 25 16 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 84218 MLO 1998 02 20 19 46 00 6396-66 P co CCGG 105.060 -999.990 ... R5 1998 02 25 16 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 84219 MLO 1998 02 27 19 38 00 2269-66 S co CCGG 110.410 -999.990 S.. R5 1998 03 16 09 25 00 19.5300 -155.5800 3437.00 3397.00 40.00 84220 MLO 1998 02 27 19 38 00 2270-66 S co CCGG 109.780 -999.990 S.. R5 1998 03 16 09 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 84221 MLO 1998 02 27 19 50 00 4017-91 P co CCGG 113.560 -999.990 ... R5 1998 03 13 09 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 84222 MLO 1998 02 27 19 50 00 4018-91 P co CCGG 113.570 -999.990 ... R5 1998 03 13 10 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 84223 MLO 1998 03 06 20 12 00 2301-66 S co CCGG 138.660 -999.990 S.. R5 1998 03 16 08 58 00 19.5300 -155.5800 3437.00 3397.00 40.00 84224 MLO 1998 03 06 20 12 00 2302-66 S co CCGG 136.930 -999.990 S.. R5 1998 03 16 09 12 00 19.5300 -155.5800 3437.00 3397.00 40.00 84225 MLO 1998 03 06 20 13 00 1721-91 P co CCGG 135.290 -999.990 ... R5 1998 03 12 14 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 84226 MLO 1998 03 06 20 13 00 1722-91 P co CCGG 132.720 -999.990 ... R5 1998 03 12 14 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 84227 MLO 1998 03 13 19 31 00 2257-66 S co CCGG 99.820 -999.990 S.. R5 1998 03 30 13 47 00 19.5300 -155.5800 3437.00 3397.00 40.00 84228 MLO 1998 03 13 19 31 00 2258-66 S co CCGG 99.470 -999.990 S.. R5 1998 03 30 14 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 84229 MLO 1998 03 13 19 47 00 6295-66 P co CCGG 103.280 -999.990 .X. R5 1998 03 25 15 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 84230 MLO 1998 03 13 19 47 00 6296-66 P co CCGG 102.720 -999.990 .X. R5 1998 03 25 15 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 84231 MLO 1998 03 20 19 30 00 2141-66 S co CCGG 172.520 -999.990 S.. R5 1998 03 30 14 42 00 19.5300 -155.5800 3437.00 3397.00 40.00 84232 MLO 1998 03 20 19 30 00 2142-66 S co CCGG 172.650 -999.990 S.. R5 1998 03 30 14 56 00 19.5300 -155.5800 3437.00 3397.00 40.00 84233 MLO 1998 03 20 19 42 00 6925-66 P co CCGG 183.730 -999.990 .X. R5 1998 03 25 14 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 84234 MLO 1998 03 20 19 42 00 6926-66 P co CCGG 183.070 -999.990 .X. R5 1998 03 25 14 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 84235 MLO 1998 03 27 19 32 00 2067-66 S co CCGG 167.440 -999.990 S.. R5 1998 04 09 14 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 84236 MLO 1998 03 27 19 32 00 2068-66 S co CCGG 167.370 -999.990 S.. R5 1998 04 09 14 40 00 19.5300 -155.5800 3437.00 3397.00 40.00 84237 MLO 1998 03 27 19 47 00 6029-66 P co CCGG 170.920 -999.990 ... R5 1998 04 08 12 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 84238 MLO 1998 03 27 19 47 00 6030-66 P co CCGG 170.380 -999.990 ... R5 1998 04 08 12 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 84239 MLO 1998 04 03 19 40 00 2133-66 S co CCGG 161.540 -999.990 S.. R5 1998 04 09 13 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 84240 MLO 1998 04 03 19 40 00 2134-66 S co CCGG 161.880 -999.990 S.. R5 1998 04 09 14 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84241 MLO 1998 04 03 19 55 00 6053-66 P co CCGG 180.390 -999.990 ... R5 1998 04 08 10 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 84242 MLO 1998 04 03 19 55 00 6054-66 P co CCGG 178.590 -999.990 ... R5 1998 04 08 11 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 84243 MLO 1998 04 10 19 26 00 2055-66 S co CCGG 141.380 -999.990 S.. R5 1998 04 24 15 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 84244 MLO 1998 04 10 19 26 00 2056-66 S co CCGG 142.650 -999.990 S.. R5 1998 04 24 15 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 84245 MLO 1998 04 10 19 43 00 6137-66 P co CCGG 144.550 -999.990 ... R5 1998 04 24 12 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 84246 MLO 1998 04 10 19 43 00 6138-66 P co CCGG 144.160 -999.990 ... R5 1998 04 24 12 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 84247 MLO 1998 04 17 19 38 00 2031-66 S co CCGG 141.380 -999.990 S.. R5 1998 04 24 15 05 00 19.5300 -155.5800 3437.00 3397.00 40.00 84248 MLO 1998 04 17 19 38 00 2032-66 S co CCGG 140.600 -999.990 S.. R5 1998 04 24 15 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 84249 MLO 1998 04 17 19 53 00 6247-66 P co CCGG 145.920 -999.990 ... R5 1998 04 24 12 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 84250 MLO 1998 04 17 19 53 00 6248-66 P co CCGG 145.470 -999.990 ... R5 1998 04 24 12 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 84251 MLO 1998 04 24 19 34 00 2103-66 S co CCGG 130.470 -999.990 S.. R5 1998 05 07 10 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84252 MLO 1998 04 24 19 34 00 2104-66 S co CCGG 129.120 -999.990 S.. R5 1998 05 07 10 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 84253 MLO 1998 04 24 19 53 00 6417-66 P co CCGG 136.460 -999.990 ... R5 1998 05 06 13 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 84254 MLO 1998 04 24 19 53 00 6418-66 P co CCGG 135.740 -999.990 ... R5 1998 05 06 14 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 84255 MLO 1998 05 01 19 32 00 2267-66 S co CCGG 142.280 -999.990 S.. R5 1998 05 07 09 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 84256 MLO 1998 05 01 19 32 00 2268-66 S co CCGG 142.430 -999.990 S.. R5 1998 05 07 09 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 84257 MLO 1998 05 01 19 46 00 6491-66 P co CCGG 150.110 -999.990 ... R5 1998 05 06 13 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 84258 MLO 1998 05 01 19 46 00 6492-66 P co CCGG 148.700 -999.990 ... R5 1998 05 06 13 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 84259 MLO 1998 05 08 19 26 00 2207-66 S co CCGG 126.350 -999.990 S.. R5 1998 05 22 11 45 00 19.5300 -155.5800 3437.00 3397.00 40.00 84260 MLO 1998 05 08 19 26 00 2208-66 S co CCGG 126.010 -999.990 S.. R5 1998 05 22 11 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 84261 MLO 1998 05 08 19 46 00 6087-66 P co CCGG 138.030 -999.990 ... R5 1998 05 22 14 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 84262 MLO 1998 05 08 19 46 00 6088-66 P co CCGG 137.360 -999.990 ... R5 1998 05 22 14 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 84263 MLO 1998 05 15 19 27 00 2015-66 S co CCGG 108.040 -999.990 S.. R5 1998 05 22 10 48 00 19.5300 -155.5800 3437.00 3397.00 40.00 84264 MLO 1998 05 15 19 27 00 2016-66 S co CCGG 108.000 -999.990 S.. R5 1998 05 22 11 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 84265 MLO 1998 05 15 19 42 00 6907-66 P co CCGG 116.080 -999.990 P.. R5 1998 05 22 13 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 84266 MLO 1998 05 15 19 42 00 6908-66 P co CCGG 112.930 -999.990 P.. R5 1998 05 22 13 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 84267 MLO 1998 05 22 19 46 00 2019-66 S co CCGG 114.100 -999.990 S.. R5 1998 06 10 13 48 00 19.5300 -155.5800 3437.00 3397.00 40.00 84268 MLO 1998 05 22 19 46 00 2020-66 S co CCGG 115.100 -999.990 S.. R5 1998 06 10 14 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 84269 MLO 1998 05 22 20 04 00 6369-66 P co CCGG 119.220 -999.990 ... R5 1998 06 17 14 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 84270 MLO 1998 05 22 20 04 00 6370-66 P co CCGG 118.620 -999.990 ... R5 1998 06 17 14 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 84271 MLO 1998 05 29 19 36 00 2093-66 S co CCGG 111.790 -999.990 S.. R5 1998 06 10 13 21 00 19.5300 -155.5800 3437.00 3397.00 40.00 84272 MLO 1998 05 29 19 36 00 2094-66 S co CCGG 111.570 -999.990 S.. R5 1998 06 10 13 35 00 19.5300 -155.5800 3437.00 3397.00 40.00 84273 MLO 1998 05 29 19 56 00 6579-66 P co CCGG 118.350 -999.990 ... R5 1998 06 17 10 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 84274 MLO 1998 05 29 19 56 00 6580-66 P co CCGG 116.640 -999.990 ... R5 1998 06 17 11 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 84275 MLO 1998 06 05 19 36 00 2031-66 S co CCGG 108.330 -999.990 S.. R5 1998 07 07 09 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 84276 MLO 1998 06 05 19 36 00 2032-66 S co CCGG 108.500 -999.990 S.. R5 1998 07 07 09 58 00 19.5300 -155.5800 3437.00 3397.00 40.00 84277 MLO 1998 06 05 19 55 00 6073-66 P co CCGG 111.650 -999.990 P.. R5 1998 07 09 12 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 84278 MLO 1998 06 05 19 55 00 6074-66 P co CCGG 108.520 -999.990 P.. R5 1998 07 09 12 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 84279 MLO 1998 06 12 19 29 00 2055-66 S co CCGG 136.370 -999.990 S.. R5 1998 07 07 10 11 00 19.5300 -155.5800 3437.00 3397.00 40.00 84280 MLO 1998 06 12 19 29 00 2056-66 S co CCGG 136.070 -999.990 S.. R5 1998 07 07 10 25 00 19.5300 -155.5800 3437.00 3397.00 40.00 84281 MLO 1998 06 12 19 47 00 6567-66 P co CCGG 132.130 -999.990 ... R5 1998 07 09 12 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 84282 MLO 1998 06 12 19 47 00 6568-66 P co CCGG 133.010 -999.990 ... R5 1998 07 09 13 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 84283 MLO 1998 06 19 19 27 00 2087-66 S co CCGG 103.650 -999.990 S.. R5 1998 07 01 10 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 84284 MLO 1998 06 19 19 27 00 2088-66 S co CCGG 104.050 -999.990 S.. R5 1998 07 01 10 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 84285 MLO 1998 06 19 19 46 00 6553-66 P co CCGG 109.750 -999.990 ... R5 1998 07 09 13 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 84286 MLO 1998 06 19 19 46 00 6554-66 P co CCGG 108.840 -999.990 ... R5 1998 07 09 13 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 84287 MLO 1998 06 26 19 27 00 2183-66 S co CCGG 89.760 -999.990 S.. R5 1998 07 01 09 25 00 19.5300 -155.5800 3437.00 3397.00 40.00 84288 MLO 1998 06 26 19 27 00 2184-66 S co CCGG 89.750 -999.990 S.. R5 1998 07 01 09 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 84289 MLO 1998 06 26 19 51 00 6901-66 P co CCGG 96.840 -999.990 ... R5 1998 07 09 13 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 84290 MLO 1998 06 26 19 51 00 6902-66 P co CCGG 96.790 -999.990 ... R5 1998 07 09 13 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 84291 MLO 1998 07 02 19 25 00 2141-66 S co CCGG 89.860 -999.990 S.. R5 1998 07 16 15 18 00 19.5300 -155.5800 3437.00 3397.00 40.00 84292 MLO 1998 07 02 19 25 00 2142-66 S co CCGG 89.770 -999.990 S.. R5 1998 07 16 15 32 00 19.5300 -155.5800 3437.00 3397.00 40.00 84293 MLO 1998 07 02 19 38 00 6089-66 P co CCGG 94.250 -999.990 ... R5 1998 07 13 12 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84294 MLO 1998 07 02 19 38 00 6090-66 P co CCGG 91.840 -999.990 ... R5 1998 07 13 12 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 84295 MLO 1998 07 10 19 42 00 2333-66 S co CCGG 78.470 -999.990 S.. R5 1998 07 16 15 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 84296 MLO 1998 07 10 19 42 00 2334-66 S co CCGG 78.210 -999.990 S.. R5 1998 07 16 15 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 84297 MLO 1998 07 10 19 58 00 6451-66 P co CCGG 83.920 -999.990 ... R5 1998 07 13 12 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 84298 MLO 1998 07 10 19 58 00 6452-66 P co CCGG 83.820 -999.990 ... R5 1998 07 13 13 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 84299 MLO 1998 07 17 19 36 00 2077-66 S co CCGG 81.380 -999.990 S.. R5 1998 08 17 11 15 00 19.5300 -155.5800 3437.00 3397.00 40.00 84300 MLO 1998 07 17 19 36 00 2078-66 S co CCGG 79.380 -999.990 S.. R5 1998 08 17 11 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 84301 MLO 1998 07 17 19 51 00 6215-66 P co CCGG 83.100 -999.990 P.. R5 1998 07 28 16 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 84302 MLO 1998 07 17 19 51 00 6216-66 P co CCGG 109.770 -999.990 P.. R5 1998 07 28 16 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 84303 MLO 1998 07 23 19 02 00 6275-66 P co CCGG 85.330 -999.990 ... R5 1998 07 28 15 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 84304 MLO 1998 07 23 19 02 00 6276-66 P co CCGG 83.890 -999.990 ... R5 1998 07 28 16 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 84305 MLO 1998 07 23 19 32 00 2081-66 S co CCGG 82.680 -999.990 S.. R5 1998 08 17 10 47 00 19.5300 -155.5800 3437.00 3397.00 40.00 84306 MLO 1998 07 23 19 32 00 2082-66 S co CCGG 84.370 -999.990 S.. R5 1998 08 17 11 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 84307 MLO 1998 07 31 19 27 00 2131-66 S co CCGG 72.030 -999.990 S.. R5 1998 08 19 10 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 84308 MLO 1998 07 31 19 27 00 2132-66 S co CCGG 75.020 -999.990 S.. R5 1998 08 19 10 41 00 19.5300 -155.5800 3437.00 3397.00 40.00 84309 MLO 1998 07 31 19 43 00 6013-66 P co CCGG 79.310 -999.990 ... R5 1998 08 12 13 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 84310 MLO 1998 07 31 19 43 00 6014-66 P co CCGG 78.820 -999.990 ... R5 1998 08 12 14 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 84311 MLO 1998 08 07 19 28 00 2267-66 S co CCGG 70.810 -999.990 S.. R5 1998 08 19 10 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84312 MLO 1998 08 07 19 28 00 2268-66 S co CCGG 70.750 -999.990 S.. R5 1998 08 19 10 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84313 MLO 1998 08 07 19 44 00 6855-66 P co CCGG 74.630 -999.990 ... R5 1998 08 12 14 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 84314 MLO 1998 08 07 19 44 00 6856-66 P co CCGG 73.000 -999.990 ... R5 1998 08 12 14 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 84315 MLO 1998 08 14 19 49 00 2093-66 S co CCGG 65.860 -999.990 S.. R5 1998 08 28 13 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 84316 MLO 1998 08 14 19 49 00 2094-66 S co CCGG 66.600 -999.990 S.. R5 1998 08 28 13 16 00 19.5300 -155.5800 3437.00 3397.00 40.00 84317 MLO 1998 08 14 19 49 00 6925-66 P co CCGG 71.260 -999.990 ... R5 1998 08 27 14 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 84318 MLO 1998 08 14 19 49 00 6926-66 P co CCGG 69.410 -999.990 ... R5 1998 08 27 14 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84319 MLO 1998 08 21 19 38 00 2133-66 S co CCGG 77.660 -999.990 S.. R5 1998 08 28 12 35 00 19.5300 -155.5800 3437.00 3397.00 40.00 84320 MLO 1998 08 21 19 38 00 2134-66 S co CCGG 77.650 -999.990 S.. R5 1998 08 28 12 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 84321 MLO 1998 08 21 19 50 00 6529-66 P co CCGG 83.060 -999.990 ... R5 1998 08 27 15 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 84322 MLO 1998 08 21 19 50 00 6530-66 P co CCGG 80.830 -999.990 ... R5 1998 08 27 15 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 84323 MLO 1998 08 28 19 36 00 2053-66 S co CCGG 84.430 -999.990 S.. R5 1998 09 11 10 47 00 19.5300 -155.5800 3437.00 3397.00 40.00 84324 MLO 1998 08 28 19 36 00 2054-66 S co CCGG 82.560 -999.990 S.. R5 1998 09 11 11 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 84325 MLO 1998 08 28 19 53 00 6247-66 P co CCGG 87.820 -999.990 ... R5 1998 09 25 09 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 84326 MLO 1998 08 28 19 53 00 6295-66 P co CCGG 87.010 -999.990 ... R5 1998 09 25 09 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 84327 MLO 1998 09 04 19 45 00 2155-66 S co CCGG 68.940 -999.990 S.. R5 1998 09 11 11 15 00 19.5300 -155.5800 3437.00 3397.00 40.00 84328 MLO 1998 09 04 19 45 00 2156-66 S co CCGG 69.860 -999.990 S.. R5 1998 09 11 11 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 84329 MLO 1998 09 04 20 04 00 6492-66 P co CCGG 71.670 -999.990 P.. R5 1998 09 24 16 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 84330 MLO 1998 09 04 20 04 00 6499-66 P co CCGG 74.930 -999.990 P.. R5 1998 09 24 16 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 84331 MLO 1998 09 11 19 35 00 2015-66 S co CCGG 71.300 -999.990 S.. R5 1998 09 28 11 36 00 19.5300 -155.5800 3437.00 3397.00 40.00 84332 MLO 1998 09 11 19 35 00 2016-66 S co CCGG 70.800 -999.990 S.. R5 1998 09 28 11 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 84333 MLO 1998 09 11 19 59 00 6605-66 P co CCGG 76.250 -999.990 ... R5 1998 09 24 15 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 84334 MLO 1998 09 11 19 59 00 6606-66 P co CCGG 75.810 -999.990 ... R5 1998 09 24 16 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 84335 MLO 1998 09 18 19 58 00 6809-66 P co CCGG 89.570 -999.990 ... R5 1998 09 24 15 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 84336 MLO 1998 09 18 19 58 00 6810-66 P co CCGG 90.840 -999.990 ... R5 1998 09 24 15 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 84337 MLO 1998 09 18 20 11 00 2207-66 S co CCGG 89.170 -999.990 S.. R5 1998 09 28 10 40 00 19.5300 -155.5800 3437.00 3397.00 40.00 84338 MLO 1998 09 18 20 11 00 2208-66 S co CCGG 88.570 -999.990 S.. R5 1998 09 28 10 53 00 19.5300 -155.5800 3437.00 3397.00 40.00 84339 MLO 1998 09 25 19 24 00 2067-66 S co CCGG 87.600 -999.990 S.. R5 1998 10 09 09 56 00 19.5300 -155.5800 3437.00 3397.00 40.00 84340 MLO 1998 09 25 19 24 00 2068-66 S co CCGG 88.230 -999.990 S.. R5 1998 10 09 10 09 00 19.5300 -155.5800 3437.00 3397.00 40.00 84341 MLO 1998 09 25 19 54 00 6247-66 P co CCGG 91.430 -999.990 ... R5 1998 10 08 12 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 84342 MLO 1998 09 25 19 54 00 6248-66 P co CCGG 91.590 -999.990 ... R5 1998 10 08 12 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 84343 MLO 1998 10 02 19 50 00 2103-66 S co CCGG 80.410 -999.990 S.. R5 1998 10 09 09 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 84344 MLO 1998 10 02 19 50 00 2104-66 S co CCGG 79.360 -999.990 S.. R5 1998 10 09 09 42 00 19.5300 -155.5800 3437.00 3397.00 40.00 84345 MLO 1998 10 02 19 52 00 6333-66 P co CCGG 83.680 -999.990 ... R5 1998 10 08 11 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 84346 MLO 1998 10 02 19 52 00 6334-66 P co CCGG 83.760 -999.990 ... R5 1998 10 08 11 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 84347 MLO 1998 10 09 19 33 00 2031-66 S co CCGG 93.950 -999.990 S.. R5 1998 10 23 12 35 00 19.5300 -155.5800 3437.00 3397.00 40.00 84348 MLO 1998 10 09 19 33 00 2032-66 S co CCGG 94.460 -999.990 S.. R5 1998 10 23 12 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 84349 MLO 1998 10 09 19 47 00 6025-66 P co CCGG 98.440 -999.990 ... R5 1998 10 27 09 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 84350 MLO 1998 10 09 19 47 00 6026-66 P co CCGG 98.420 -999.990 ... R5 1998 10 27 09 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84351 MLO 1998 10 16 19 29 00 2307-66 S co CCGG 93.850 -999.990 S.. R5 1998 10 23 13 03 00 19.5300 -155.5800 3437.00 3397.00 40.00 84352 MLO 1998 10 16 19 29 00 2308-66 S co CCGG 94.060 -999.990 S.. R5 1998 10 23 13 16 00 19.5300 -155.5800 3437.00 3397.00 40.00 84353 MLO 1998 10 16 19 47 00 6365-66 P co CCGG 96.490 -999.990 ... R5 1998 10 27 09 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 84354 MLO 1998 10 16 19 47 00 6366-66 P co CCGG 95.740 -999.990 ... R5 1998 10 27 09 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 84355 MLO 1998 10 23 19 38 00 2141-66 S co CCGG 106.620 -999.990 S.. R5 1998 11 05 10 40 00 19.5300 -155.5800 3437.00 3397.00 40.00 84356 MLO 1998 10 23 19 38 00 2142-66 S co CCGG 106.850 -999.990 S.. R5 1998 11 05 10 53 00 19.5300 -155.5800 3437.00 3397.00 40.00 84357 MLO 1998 10 23 19 59 00 6831-66 P co CCGG 112.040 -999.990 ... R5 1998 11 10 12 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 84358 MLO 1998 10 23 19 59 00 6832-66 P co CCGG 110.120 -999.990 ... R5 1998 11 10 12 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 84359 MLO 1998 10 30 19 38 00 2258-66 S co CCGG 93.860 -999.990 S.. R5 1998 11 05 10 24 00 19.5300 -155.5800 3437.00 3397.00 40.00 84360 MLO 1998 10 30 19 55 00 6825-66 P co CCGG 96.990 -999.990 ... R5 1998 11 10 11 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 84361 MLO 1998 10 30 19 55 00 6826-66 P co CCGG 95.250 -999.990 ... R5 1998 11 10 12 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 84362 MLO 1998 11 06 19 41 00 2311-66 S co CCGG 98.090 -999.990 S.. R5 1998 12 02 12 54 00 19.5300 -155.5800 3437.00 3397.00 40.00 84363 MLO 1998 11 06 19 41 00 2312-66 S co CCGG 97.330 -999.990 S.. R5 1998 12 02 13 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 84364 MLO 1998 11 06 19 58 00 6153-66 P co CCGG 96.820 -999.990 ... R5 1998 11 20 15 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 84365 MLO 1998 11 06 19 58 00 6154-66 P co CCGG 97.970 -999.990 ... R5 1998 11 20 15 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 84366 MLO 1998 11 13 19 54 00 6159-66 P co CCGG 91.610 -999.990 ... R5 1998 11 20 14 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 84367 MLO 1998 11 13 19 54 00 6160-66 P co CCGG 90.510 -999.990 ... R5 1998 11 20 14 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 84368 MLO 1998 11 20 19 44 00 6193-66 P co CCGG 105.950 -999.990 ... R5 1998 12 01 09 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 84369 MLO 1998 11 20 19 44 00 6194-66 P co CCGG 104.490 -999.990 ... R5 1998 12 01 10 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 84370 MLO 1998 11 20 20 10 00 2333-66 S co CCGG 102.120 -999.990 S.. R5 1998 12 02 12 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84371 MLO 1998 11 20 20 10 00 2334-66 S co CCGG 101.600 -999.990 S.. R5 1998 12 02 12 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84372 MLO 1998 11 27 19 22 00 2167-66 S co CCGG 107.110 -999.990 S.. R5 1998 12 17 11 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 84373 MLO 1998 11 27 19 22 00 2168-66 S co CCGG 106.460 -999.990 S.. R5 1998 12 17 11 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 84374 MLO 1998 11 27 19 47 00 6283-66 P co CCGG 110.050 -999.990 ... R5 1998 12 01 10 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84375 MLO 1998 11 27 19 47 00 6284-66 P co CCGG 110.520 -999.990 ... R5 1998 12 01 10 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 84376 MLO 1998 12 04 19 48 00 6907-66 P co CCGG 120.820 -999.990 ... R5 1998 12 15 09 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 84377 MLO 1998 12 04 19 48 00 6908-66 P co CCGG 119.520 -999.990 ... R5 1998 12 15 09 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 84378 MLO 1998 12 04 20 10 00 2131-66 S co CCGG 135.050 -999.990 S.. R5 1998 12 17 10 52 00 19.5300 -155.5800 3437.00 3397.00 40.00 84379 MLO 1998 12 04 20 10 00 2132-66 S co CCGG 138.310 -999.990 S.. R5 1998 12 17 11 06 00 19.5300 -155.5800 3437.00 3397.00 40.00 84380 MLO 1998 12 11 19 20 00 2155-66 S co CCGG 136.230 -999.990 S.. R5 1998 12 28 14 47 00 19.5300 -155.5800 3437.00 3397.00 40.00 84381 MLO 1998 12 11 19 20 00 2156-66 S co CCGG 135.270 -999.990 S.. R5 1998 12 28 15 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 84382 MLO 1998 12 11 19 53 00 6085-66 P co CCGG 128.190 -999.990 ... R5 1998 12 15 10 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 84383 MLO 1998 12 11 19 53 00 6086-66 P co CCGG 128.200 -999.990 ... R5 1998 12 15 10 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 84384 MLO 1998 12 18 19 35 00 6071-66 P co CCGG 127.900 -999.990 ... R5 1999 01 15 14 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 84385 MLO 1998 12 18 19 35 00 6072-66 P co CCGG 127.640 -999.990 ... R5 1999 01 15 14 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 84386 MLO 1998 12 18 20 14 00 2089-66 S co CCGG 124.880 -999.990 S.. R5 1998 12 28 14 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 84387 MLO 1998 12 18 20 14 00 2090-66 S co CCGG 124.000 -999.990 S.. R5 1998 12 28 14 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 84388 MLO 1998 12 23 19 23 00 6519-66 S co CCGG 118.810 -999.990 S.. R5 1999 01 21 12 32 00 19.5300 -155.5800 3437.00 3397.00 40.00 84389 MLO 1998 12 23 19 23 00 6520-66 S co CCGG 118.410 -999.990 S.. R5 1999 01 21 12 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 84390 MLO 1998 12 23 20 06 00 6559-66 P co CCGG 125.000 -999.990 ... R5 1999 01 19 09 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 84391 MLO 1998 12 23 20 06 00 6560-66 P co CCGG 124.610 -999.990 ... R5 1999 01 19 10 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 84392 MLO 1998 12 30 19 20 00 6871-66 S co CCGG 108.400 -999.990 S.. R5 1999 01 21 13 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84393 MLO 1998 12 30 19 20 00 6872-66 S co CCGG 108.240 -999.990 S.. R5 1999 01 21 13 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84394 MLO 1998 12 30 19 58 00 4029-91 P co CCGG 108.520 -999.990 ... R5 1999 01 11 11 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 84395 MLO 1998 12 30 19 58 00 4030-91 P co CCGG 107.130 -999.990 ... R5 1999 01 11 12 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 84396 MLO 1999 01 08 19 21 00 6583-66 S co CCGG 105.510 -999.990 S.. R5 1999 01 20 11 34 00 19.5300 -155.5800 3437.00 3397.00 40.00 84397 MLO 1999 01 08 19 21 00 6584-66 S co CCGG 105.000 -999.990 S.. R5 1999 01 20 11 47 00 19.5300 -155.5800 3437.00 3397.00 40.00 84398 MLO 1999 01 08 19 50 00 6263-66 P co CCGG 102.830 -999.990 ... R5 1999 01 20 12 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 84399 MLO 1999 01 08 19 50 00 6264-66 P co CCGG 103.190 -999.990 ... R5 1999 01 20 12 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 84400 MLO 1999 01 15 19 47 00 6727-66 P co CCGG 107.600 -999.990 ... R5 1999 01 26 14 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 84401 MLO 1999 01 15 19 47 00 6728-66 P co CCGG 106.720 -999.990 ... R5 1999 01 26 14 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 84402 MLO 1999 01 15 20 10 00 6215-66 S co CCGG 105.110 -999.990 S.. R5 1999 01 21 16 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84403 MLO 1999 01 15 20 10 00 6216-66 S co CCGG 104.580 -999.990 S.. R5 1999 01 21 16 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 84404 MLO 1999 01 22 19 38 00 4145-91 P co CCGG 108.390 -999.990 ... R5 1999 02 12 10 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 84405 MLO 1999 01 22 19 38 00 4146-91 P co CCGG 107.090 -999.990 ... R5 1999 02 12 10 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84406 MLO 1999 01 22 20 10 00 15-91 S co CCGG 105.510 -999.990 S.. R5 1999 02 12 09 47 00 19.5300 -155.5800 3437.00 3397.00 40.00 84407 MLO 1999 01 22 20 10 00 16-91 S co CCGG 105.240 -999.990 S.. R5 1999 02 12 10 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 84408 MLO 1999 01 29 19 23 00 6183-66 S co CCGG 127.120 -999.990 S.. R5 1999 02 11 10 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84409 MLO 1999 01 29 19 23 00 6184-66 S co CCGG 128.150 -999.990 S.. R5 1999 02 11 10 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 84410 MLO 1999 01 29 19 50 00 6043-66 P co CCGG 137.060 -999.990 ... R5 1999 02 11 09 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 84411 MLO 1999 01 29 19 50 00 6044-66 P co CCGG 135.430 -999.990 ... R5 1999 02 11 09 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 84412 MLO 1999 02 05 19 24 00 6271-66 S co CCGG 122.550 -999.990 S.. R5 1999 02 11 16 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 84413 MLO 1999 02 05 19 24 00 6272-66 S co CCGG 123.240 -999.990 S.. R5 1999 02 11 16 16 00 19.5300 -155.5800 3437.00 3397.00 40.00 84414 MLO 1999 02 05 19 58 00 6423-66 P co CCGG 127.610 -999.990 ... R5 1999 02 11 16 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 84415 MLO 1999 02 05 19 58 00 6424-66 P co CCGG 126.440 -999.990 ... R5 1999 02 11 16 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 84416 MLO 1999 02 12 19 35 00 6291-66 P co CCGG 112.290 -999.990 ... R5 1999 02 25 13 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 84417 MLO 1999 02 12 19 35 00 6292-66 P co CCGG 111.650 -999.990 ... R5 1999 02 25 13 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 84418 MLO 1999 02 12 20 14 00 6229-66 S co CCGG 131.380 -999.990 S.. R5 1999 02 25 12 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 84419 MLO 1999 02 12 20 14 00 6230-66 S co CCGG 129.300 -999.990 S.. R5 1999 02 25 12 53 00 19.5300 -155.5800 3437.00 3397.00 40.00 84420 MLO 1999 02 19 19 23 00 6521-66 S co CCGG 88.590 -999.990 S.. R5 1999 02 24 13 06 00 19.5300 -155.5800 3437.00 3397.00 40.00 84421 MLO 1999 02 19 19 23 00 6522-66 S co CCGG 88.530 -999.990 S.. R5 1999 02 24 13 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 84422 MLO 1999 02 19 19 52 00 6825-66 P co CCGG 90.270 -999.990 ... R5 1999 02 24 09 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 84423 MLO 1999 02 19 19 52 00 6826-66 P co CCGG 89.750 -999.990 ... R5 1999 02 24 09 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 84424 MLO 1999 02 26 19 37 00 6365-66 P co CCGG 104.750 -999.990 ... R5 1999 03 03 12 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 84425 MLO 1999 02 26 19 37 00 6366-66 P co CCGG 104.260 -999.990 ... R5 1999 03 03 12 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 84426 MLO 1999 02 26 20 10 00 6025-66 S co CCGG 104.700 -999.990 S.. R5 1999 03 03 12 48 00 19.5300 -155.5800 3437.00 3397.00 40.00 84427 MLO 1999 02 26 20 10 00 6026-66 S co CCGG 105.880 -999.990 S.. R5 1999 03 03 13 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 84428 MLO 1999 03 05 19 47 00 6637-66 P co CCGG 78.730 -999.990 .X. R5 1999 03 16 12 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 84429 MLO 1999 03 05 19 47 00 6638-66 P co CCGG 78.000 -999.990 .X. R5 1999 03 16 12 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 84430 MLO 1999 03 05 20 12 00 6215-66 S co CCGG 75.120 -999.990 S.. R5 1999 03 16 10 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 84431 MLO 1999 03 05 20 12 00 6216-66 S co CCGG 74.590 -999.990 S.. R5 1999 03 16 11 03 00 19.5300 -155.5800 3437.00 3397.00 40.00 84432 MLO 1999 03 12 19 22 00 6693-66 S co CCGG 166.500 -999.990 S.. R5 1999 03 16 15 55 00 19.5300 -155.5800 3437.00 3397.00 40.00 84433 MLO 1999 03 12 19 22 00 6694-66 S co CCGG 169.150 -999.990 S.. R5 1999 03 16 16 09 00 19.5300 -155.5800 3437.00 3397.00 40.00 84434 MLO 1999 03 12 20 02 00 6519-66 P co CCGG 163.490 -999.990 .X. R5 1999 03 17 09 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 84435 MLO 1999 03 12 20 02 00 6520-66 P co CCGG 162.100 -999.990 .X. R5 1999 03 17 09 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 84436 MLO 1999 03 19 19 23 00 6583-66 S co CCGG 102.580 -999.990 S.. R5 1999 03 30 15 55 00 19.5300 -155.5800 3437.00 3397.00 40.00 84437 MLO 1999 03 19 19 23 00 6584-66 S co CCGG 101.670 -999.990 S.. R5 1999 03 30 16 09 00 19.5300 -155.5800 3437.00 3397.00 40.00 84438 MLO 1999 03 19 20 00 00 6871-66 P co CCGG 127.990 -999.990 ... R5 1999 03 30 16 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 84439 MLO 1999 03 19 20 00 00 6872-66 P co CCGG 128.860 -999.990 ... R5 1999 03 30 16 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 84440 MLO 1999 03 26 19 15 00 6071-66 S co CCGG 119.290 -999.990 S.. R5 1999 04 02 12 09 00 19.5300 -155.5800 3437.00 3397.00 40.00 84441 MLO 1999 03 26 19 15 00 6072-66 S co CCGG 120.070 -999.990 S.. R5 1999 04 02 12 23 00 19.5300 -155.5800 3437.00 3397.00 40.00 84442 MLO 1999 03 26 19 47 00 6085-66 P co CCGG 123.730 -999.990 ... R5 1999 04 02 12 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 84443 MLO 1999 03 26 19 47 00 6086-66 P co CCGG 122.730 -999.990 ... R5 1999 04 02 12 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 84444 MLO 1999 04 02 19 19 00 1591-91 S co CCGG 156.100 -999.990 S.. R5 1999 04 09 16 21 00 19.5300 -155.5800 3437.00 3397.00 40.00 84445 MLO 1999 04 02 19 19 00 1592-91 S co CCGG 156.590 -999.990 S.. R5 1999 04 09 16 35 00 19.5300 -155.5800 3437.00 3397.00 40.00 84446 MLO 1999 04 02 19 53 00 745-91 P co CCGG 149.440 -999.990 ... R5 1999 04 09 15 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 84447 MLO 1999 04 02 19 53 00 746-91 P co CCGG 148.770 -999.990 ... R5 1999 04 09 16 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 84448 MLO 1999 04 09 19 39 00 6155-66 P co CCGG 157.800 -999.990 ... R5 1999 04 15 12 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 84449 MLO 1999 04 09 19 39 00 6156-66 P co CCGG 158.380 -999.990 ... R5 1999 04 15 12 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 84450 MLO 1999 04 09 20 15 00 6375-66 S co CCGG 153.710 -999.990 S.. R5 1999 04 15 11 07 00 19.5300 -155.5800 3437.00 3397.00 40.00 84451 MLO 1999 04 09 20 15 00 6376-66 S co CCGG 153.270 -999.990 S.. R5 1999 04 15 11 21 00 19.5300 -155.5800 3437.00 3397.00 40.00 84452 MLO 1999 04 16 19 22 00 1123-91 S co CCGG 140.080 -999.990 S.. R5 1999 04 26 10 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 84453 MLO 1999 04 16 19 22 00 1124-91 S co CCGG 140.430 -999.990 S.. R5 1999 04 26 10 21 00 19.5300 -155.5800 3437.00 3397.00 40.00 84454 MLO 1999 04 16 19 38 00 189-91 P co CCGG 139.170 -999.990 ... R5 1999 04 26 09 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 84455 MLO 1999 04 16 19 38 00 190-91 P co CCGG 137.980 -999.990 ... R5 1999 04 26 09 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 84456 MLO 1999 04 23 19 37 00 4705-91 P co CCGG 87.630 -999.990 ... R5 1999 04 30 16 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 84457 MLO 1999 04 23 19 37 00 4706-91 P co CCGG 87.730 -999.990 ... R5 1999 04 30 16 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 84458 MLO 1999 04 23 20 12 00 695-91 S co CCGG 81.650 -999.990 S.. R5 1999 04 30 15 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84459 MLO 1999 04 23 20 12 00 696-91 S co CCGG 81.840 -999.990 S.. R5 1999 04 30 15 27 00 19.5300 -155.5800 3437.00 3397.00 40.00 84460 MLO 1999 04 30 19 47 00 6001-66 P co CCGG 101.600 -999.990 ... R5 1999 05 07 12 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 84461 MLO 1999 04 30 19 47 00 6002-66 P co CCGG 100.620 -999.990 ... R5 1999 05 07 13 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 84462 MLO 1999 04 30 20 16 00 6027-66 S co CCGG 97.970 -999.990 S.. R5 1999 05 07 12 29 00 19.5300 -155.5800 3437.00 3397.00 40.00 84463 MLO 1999 04 30 20 16 00 6028-66 S co CCGG 98.440 -999.990 S.. R5 1999 05 07 12 43 00 19.5300 -155.5800 3437.00 3397.00 40.00 84464 MLO 1999 05 07 19 48 00 4427-91 P co CCGG 115.490 -999.990 ... R5 1999 05 17 09 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 84465 MLO 1999 05 07 19 48 00 4428-91 P co CCGG 115.240 -999.990 ... R5 1999 05 17 10 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 84466 MLO 1999 05 07 20 14 00 151-98 S co CCGG 112.240 -999.990 S.. R5 1999 05 17 10 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84467 MLO 1999 05 07 20 14 00 152-98 S co CCGG 110.680 -999.990 S.. R5 1999 05 17 10 27 00 19.5300 -155.5800 3437.00 3397.00 40.00 84468 MLO 1999 05 14 19 43 00 6725-66 P co CCGG 98.000 -999.990 ... R5 1999 05 21 13 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 84469 MLO 1999 05 14 19 43 00 6726-66 P co CCGG 96.690 -999.990 ... R5 1999 05 21 13 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 84470 MLO 1999 05 14 20 18 00 6389-66 S co CCGG 91.110 -999.990 S.. R5 1999 05 21 12 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 84471 MLO 1999 05 14 20 18 00 6390-66 S co CCGG 90.220 -999.990 S.. R5 1999 05 21 13 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 84472 MLO 1999 05 21 19 19 00 1303-91 S co CCGG 86.610 -999.990 S.. R5 1999 06 04 11 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 84473 MLO 1999 05 21 19 19 00 1304-91 S co CCGG 87.280 -999.990 S.. R5 1999 06 04 12 05 00 19.5300 -155.5800 3437.00 3397.00 40.00 84474 MLO 1999 05 21 19 42 00 669-91 P co CCGG 89.450 -999.990 ... R5 1999 06 04 12 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 84475 MLO 1999 05 21 19 42 00 670-91 P co CCGG 89.220 -999.990 ... R5 1999 06 04 12 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 84476 MLO 1999 05 28 19 40 00 6417-66 P co CCGG 89.380 -999.990 ... R5 1999 06 03 13 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 84477 MLO 1999 05 28 19 40 00 6418-66 P co CCGG 87.820 -999.990 ... R5 1999 06 03 14 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 84478 MLO 1999 05 28 20 16 00 6917-66 S co CCGG 86.000 -999.990 S.. R5 1999 06 03 12 36 00 19.5300 -155.5800 3437.00 3397.00 40.00 84479 MLO 1999 05 28 20 16 00 6918-66 S co CCGG 88.060 -999.990 S.. R5 1999 06 03 12 50 00 19.5300 -155.5800 3437.00 3397.00 40.00 84480 MLO 1999 06 04 19 34 00 57-98 P co CCGG 102.350 -999.990 ... R5 1999 06 09 10 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84481 MLO 1999 06 04 19 34 00 58-98 P co CCGG 102.140 -999.990 ... R5 1999 06 09 10 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 84482 MLO 1999 06 04 20 12 00 2049-91 S co CCGG 104.690 -999.990 S.. R5 1999 06 09 10 55 00 19.5300 -155.5800 3437.00 3397.00 40.00 84483 MLO 1999 06 04 20 12 00 2050-91 S co CCGG 104.500 -999.990 S.. R5 1999 06 09 11 09 00 19.5300 -155.5800 3437.00 3397.00 40.00 84484 MLO 1999 06 11 19 34 00 6121-66 P co CCGG 75.050 -999.990 ... R5 1999 06 17 09 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 84485 MLO 1999 06 11 19 34 00 6122-66 P co CCGG 76.690 -999.990 ... R5 1999 06 17 09 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 84486 MLO 1999 06 11 20 13 00 6137-66 S co CCGG 70.040 -999.990 S.. R5 1999 06 17 09 11 00 19.5300 -155.5800 3437.00 3397.00 40.00 84487 MLO 1999 06 11 20 13 00 6138-66 S co CCGG 71.080 -999.990 S.. R5 1999 06 17 09 24 00 19.5300 -155.5800 3437.00 3397.00 40.00 84488 MLO 1999 06 18 19 36 00 6663-66 P co CCGG 83.770 -999.990 ... R5 1999 07 01 11 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 84489 MLO 1999 06 18 19 36 00 6664-66 P co CCGG 82.730 -999.990 ... R5 1999 07 01 11 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 84490 MLO 1999 06 18 20 16 00 6157-66 S co CCGG 81.160 -999.990 S.. R5 1999 07 01 12 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 84491 MLO 1999 06 18 20 16 00 6158-66 S co CCGG 78.810 -999.990 S.. R5 1999 07 01 12 41 00 19.5300 -155.5800 3437.00 3397.00 40.00 84492 MLO 1999 06 25 19 22 00 6933-66 S co CCGG 88.820 -999.990 S.. R5 1999 07 07 13 24 00 19.5300 -155.5800 3437.00 3397.00 40.00 84493 MLO 1999 06 25 19 22 00 6934-66 S co CCGG 90.000 -999.990 S.. R5 1999 07 07 13 38 00 19.5300 -155.5800 3437.00 3397.00 40.00 84494 MLO 1999 06 25 19 54 00 6649-66 P co CCGG 83.360 -999.990 ... R5 1999 07 07 12 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 84495 MLO 1999 06 25 19 54 00 6650-66 P co CCGG 82.380 -999.990 ... R5 1999 07 07 13 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 84496 MLO 1999 07 02 20 02 00 6855-66 P co CCGG 93.620 -999.990 ... R5 1999 07 15 13 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 84497 MLO 1999 07 02 20 02 00 6856-66 P co CCGG 93.610 -999.990 ... R5 1999 07 15 13 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 84498 MLO 1999 07 02 20 16 00 6565-66 S co CCGG 90.030 -999.990 S.. R5 1999 07 15 13 10 00 19.5300 -155.5800 3437.00 3397.00 40.00 84499 MLO 1999 07 02 20 16 00 6566-66 S co CCGG 88.730 -999.990 S.. R5 1999 07 15 13 24 00 19.5300 -155.5800 3437.00 3397.00 40.00 84500 MLO 1999 07 09 19 20 00 6465-66 S co CCGG 65.270 -999.990 S.. R5 1999 07 27 11 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84501 MLO 1999 07 09 19 20 00 6466-66 S co CCGG 66.930 -999.990 S.. R5 1999 07 27 11 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84502 MLO 1999 07 09 19 48 00 6357-66 P co CCGG 71.880 -999.990 ... R5 1999 07 27 10 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 84503 MLO 1999 07 09 19 48 00 6358-66 P co CCGG 71.450 -999.990 ... R5 1999 07 27 10 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 84504 MLO 1999 07 16 19 58 00 6111-66 P co CCGG 70.100 -999.990 ... R5 1999 07 26 11 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 84505 MLO 1999 07 16 19 58 00 6112-66 P co CCGG 69.320 -999.990 ... R5 1999 07 26 11 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 84506 MLO 1999 07 16 20 14 00 6637-66 S co CCGG 65.580 -999.990 S.. R5 1999 07 26 12 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 84507 MLO 1999 07 16 20 14 00 6638-66 S co CCGG 65.590 -999.990 S.. R5 1999 07 26 12 15 00 19.5300 -155.5800 3437.00 3397.00 40.00 84508 MLO 1999 07 23 19 49 00 6077-66 P co CCGG 69.790 -999.990 ... R5 1999 08 03 15 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 84509 MLO 1999 07 23 19 49 00 6078-66 P co CCGG 68.180 -999.990 ... R5 1999 08 03 16 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 84510 MLO 1999 07 23 20 04 00 6907-66 S co CCGG 69.700 -999.990 S.. R5 1999 08 03 14 34 00 19.5300 -155.5800 3437.00 3397.00 40.00 84511 MLO 1999 07 23 20 04 00 6908-66 S co CCGG 68.260 -999.990 S.. R5 1999 08 03 14 48 00 19.5300 -155.5800 3437.00 3397.00 40.00 84512 MLO 1999 08 06 19 43 00 6035-66 P co CCGG 65.560 -999.990 ... R5 1999 08 11 15 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 84513 MLO 1999 08 06 19 43 00 6036-66 P co CCGG 64.090 -999.990 ... R5 1999 08 11 15 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 84514 MLO 1999 08 06 20 16 00 6339-66 S co CCGG 60.670 -999.990 S.. R5 1999 08 11 15 34 00 19.5300 -155.5800 3437.00 3397.00 40.00 84515 MLO 1999 08 06 20 16 00 6340-66 S co CCGG 60.080 -999.990 S.. R5 1999 08 11 15 48 00 19.5300 -155.5800 3437.00 3397.00 40.00 84516 MLO 1999 08 13 19 39 00 6073-66 P co CCGG 71.580 -999.990 ... R5 1999 08 18 09 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 84517 MLO 1999 08 13 19 39 00 6074-66 P co CCGG 70.040 -999.990 ... R5 1999 08 18 09 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 84518 MLO 1999 08 13 20 17 00 6417-66 S co CCGG 67.130 -999.990 S.. R5 1999 08 18 09 03 00 19.5300 -155.5800 3437.00 3397.00 40.00 84519 MLO 1999 08 13 20 17 00 6418-66 S co CCGG -999.990 -999.990 *.. R5 1999 08 18 09 16 00 19.5300 -155.5800 3437.00 3397.00 40.00 84520 MLO 1999 08 20 19 50 00 6379-66 P co CCGG 68.280 -999.990 ... R5 1999 08 26 12 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 84521 MLO 1999 08 20 19 50 00 6380-66 P co CCGG 67.600 -999.990 ... R5 1999 08 26 13 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 84522 MLO 1999 08 20 20 12 00 6333-66 S co CCGG 66.100 -999.990 S.. R5 1999 08 26 13 42 00 19.5300 -155.5800 3437.00 3397.00 40.00 84523 MLO 1999 08 20 20 12 00 6334-66 S co CCGG 65.780 -999.990 S.. R5 1999 08 26 13 56 00 19.5300 -155.5800 3437.00 3397.00 40.00 84524 MLO 1999 08 27 20 01 00 6479-66 P co CCGG 72.350 -999.990 ... R5 1999 09 02 10 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 84525 MLO 1999 08 27 20 01 00 6480-66 P co CCGG 71.750 -999.990 ... R5 1999 09 02 10 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 84526 MLO 1999 08 27 20 19 00 6025-66 S co CCGG 62.730 -999.990 S.. R5 1999 09 01 15 40 00 19.5300 -155.5800 3437.00 3397.00 40.00 84527 MLO 1999 08 27 20 19 00 6026-66 S co CCGG 63.320 -999.990 S.. R5 1999 09 01 15 54 00 19.5300 -155.5800 3437.00 3397.00 40.00 84528 MLO 1999 09 03 19 35 00 6593-66 P co CCGG 85.800 -999.990 ... R5 1999 09 09 11 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 84529 MLO 1999 09 03 19 35 00 6594-66 P co CCGG 86.750 -999.990 ... R5 1999 09 09 11 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 84530 MLO 1999 09 03 20 18 00 6061-66 S co CCGG 80.440 -999.990 S.. R5 1999 09 09 14 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 84531 MLO 1999 09 03 20 18 00 6062-66 S co CCGG 82.640 -999.990 S.. R5 1999 09 09 14 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 84532 MLO 1999 09 10 19 29 00 6795-66 P co CCGG 86.040 -999.990 ... R5 1999 09 15 10 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 84533 MLO 1999 09 10 19 29 00 6796-66 P co CCGG 84.560 -999.990 ... R5 1999 09 15 10 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 84534 MLO 1999 09 10 20 11 00 6637-66 S co CCGG 79.790 -999.990 S.. R5 1999 09 15 09 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 84535 MLO 1999 09 10 20 11 00 6638-66 S co CCGG 79.270 -999.990 S.. R5 1999 09 15 10 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 84536 MLO 1999 09 17 19 40 00 6339-66 P co CCGG 73.280 -999.990 ... R5 1999 09 27 10 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 84537 MLO 1999 09 17 19 40 00 6340-66 P co CCGG 70.770 -999.990 ... R5 1999 09 27 11 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 84538 MLO 1999 09 17 20 16 00 6147-66 S co CCGG 68.380 -999.990 S.. R5 1999 09 27 13 40 00 19.5300 -155.5800 3437.00 3397.00 40.00 84539 MLO 1999 09 17 20 16 00 6148-66 S co CCGG 69.270 -999.990 S.. R5 1999 09 27 13 54 00 19.5300 -155.5800 3437.00 3397.00 40.00 84540 MLO 1999 09 24 19 20 00 6893-66 S co CCGG 93.650 -999.990 S.. R5 1999 09 30 13 34 00 19.5300 -155.5800 3437.00 3397.00 40.00 84541 MLO 1999 09 24 19 20 00 6894-66 S co CCGG 96.010 -999.990 S.. R5 1999 09 30 13 48 00 19.5300 -155.5800 3437.00 3397.00 40.00 84542 MLO 1999 09 24 19 51 00 6013-66 P co CCGG 104.420 -999.990 ... R5 1999 09 30 12 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 84543 MLO 1999 09 24 19 51 00 6014-66 P co CCGG 103.270 -999.990 ... R5 1999 09 30 12 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 84544 MLO 1999 10 01 19 30 00 6045-66 P co CCGG 83.940 -999.990 ... R5 1999 10 07 12 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 84545 MLO 1999 10 01 19 30 00 6046-66 P co CCGG 82.560 -999.990 ... R5 1999 10 07 12 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84546 MLO 1999 10 01 20 10 00 6437-66 S co CCGG 77.570 -999.990 S.. R5 1999 10 07 09 29 00 19.5300 -155.5800 3437.00 3397.00 40.00 84547 MLO 1999 10 01 20 10 00 6438-66 S co CCGG 78.960 -999.990 S.. R5 1999 10 07 09 43 00 19.5300 -155.5800 3437.00 3397.00 40.00 84548 MLO 1999 10 08 19 23 00 6637-66 S co CCGG 67.290 -999.990 S.. R5 1999 10 19 09 56 00 19.5300 -155.5800 3437.00 3397.00 40.00 84549 MLO 1999 10 08 19 23 00 6638-66 S co CCGG 64.890 -999.990 S.. R5 1999 10 19 10 09 00 19.5300 -155.5800 3437.00 3397.00 40.00 84550 MLO 1999 10 08 19 57 00 6233-66 P co CCGG 71.300 -999.990 ... R5 1999 10 19 09 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84551 MLO 1999 10 08 19 57 00 6234-66 P co CCGG 70.630 -999.990 ... R5 1999 10 19 09 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 84552 MLO 1999 10 15 19 23 00 6417-66 S co CCGG 84.320 -999.990 S.. R5 1999 10 21 16 16 00 19.5300 -155.5800 3437.00 3397.00 40.00 84553 MLO 1999 10 15 19 23 00 6418-66 S co CCGG 84.590 -999.990 S.. R5 1999 10 21 16 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 84554 MLO 1999 10 15 19 50 00 6605-66 P co CCGG 87.250 -999.990 ... R5 1999 10 22 10 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 84555 MLO 1999 10 15 19 50 00 6606-66 P co CCGG 85.620 -999.990 ... R5 1999 10 22 10 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 84556 MLO 1999 10 22 19 40 00 6329-66 P co CCGG 87.180 -999.990 ... R5 1999 10 28 13 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 84557 MLO 1999 10 22 19 40 00 6330-66 P co CCGG 84.990 -999.990 ... R5 1999 10 28 13 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 84558 MLO 1999 10 22 20 14 00 6367-66 S co CCGG 79.850 -999.990 S.. R5 1999 10 28 13 43 00 19.5300 -155.5800 3437.00 3397.00 40.00 84559 MLO 1999 10 22 20 14 00 6368-66 S co CCGG 80.950 -999.990 S.. R5 1999 10 28 13 57 00 19.5300 -155.5800 3437.00 3397.00 40.00 84560 MLO 1999 10 29 20 04 00 6027-66 P co CCGG 88.290 -999.990 ... R5 1999 11 04 15 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 84561 MLO 1999 10 29 20 04 00 6028-66 P co CCGG 86.840 -999.990 ... R5 1999 11 04 15 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 84562 MLO 1999 10 29 20 21 00 6025-66 S co CCGG 82.750 -999.990 S.. R5 1999 11 04 14 10 00 19.5300 -155.5800 3437.00 3397.00 40.00 84563 MLO 1999 10 29 20 21 00 6026-66 S co CCGG 83.470 -999.990 S.. R5 1999 11 04 14 24 00 19.5300 -155.5800 3437.00 3397.00 40.00 84564 MLO 1999 11 05 19 23 00 6795-66 S co CCGG 73.830 -999.990 S.. R5 1999 11 10 12 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84565 MLO 1999 11 05 19 23 00 6796-66 S co CCGG 73.180 -999.990 S.. R5 1999 11 10 12 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 84566 MLO 1999 11 05 19 53 00 6437-66 P co CCGG 76.460 -999.990 ... R5 1999 11 10 11 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 84567 MLO 1999 11 05 19 53 00 6438-66 P co CCGG 76.470 -999.990 ... R5 1999 11 10 11 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 84568 MLO 1999 11 12 19 38 00 6527-66 P co CCGG 105.730 -999.990 ... R5 1999 11 22 14 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 84569 MLO 1999 11 12 19 38 00 6528-66 P co CCGG 102.930 -999.990 ... R5 1999 11 22 14 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 84570 MLO 1999 11 12 20 19 00 6453-66 S co CCGG 102.110 -999.990 S.. R5 1999 11 22 14 50 00 19.5300 -155.5800 3437.00 3397.00 40.00 84571 MLO 1999 11 12 20 19 00 6454-66 S co CCGG 103.250 -999.990 S.. R5 1999 11 22 15 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 84572 MLO 1999 11 19 19 40 00 6265-66 P co CCGG 82.220 -999.990 ... R5 1999 12 01 09 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 84573 MLO 1999 11 19 19 40 00 6266-66 P co CCGG 81.950 -999.990 ... R5 1999 12 01 09 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 84574 MLO 1999 11 19 20 16 00 6345-66 S co CCGG 79.370 -999.990 S.. R5 1999 12 01 10 23 00 19.5300 -155.5800 3437.00 3397.00 40.00 84575 MLO 1999 11 19 20 16 00 6346-66 S co CCGG 78.900 -999.990 S.. R5 1999 12 01 10 37 00 19.5300 -155.5800 3437.00 3397.00 40.00 84576 MLO 1999 11 26 19 33 00 6047-66 P co CCGG 92.780 -999.990 ... R5 1999 12 13 15 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 84577 MLO 1999 11 26 19 33 00 6048-66 P co CCGG 92.480 -999.990 ... R5 1999 12 13 15 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 84578 MLO 1999 11 26 20 13 00 6553-66 S co CCGG 91.800 -999.990 S.. R5 1999 12 14 15 05 00 19.5300 -155.5800 3437.00 3397.00 40.00 84579 MLO 1999 11 26 20 13 00 6554-66 S co CCGG 89.990 -999.990 S.. R5 1999 12 14 15 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 84580 MLO 1999 12 01 20 06 00 6593-66 P co CCGG 103.030 -999.990 ... R5 1999 12 08 14 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84581 MLO 1999 12 01 20 06 00 6594-66 P co CCGG 101.020 -999.990 ... R5 1999 12 08 14 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 84582 MLO 1999 12 01 20 23 00 6607-66 S co CCGG 99.890 -999.990 S.. R5 1999 12 08 13 06 00 19.5300 -155.5800 3437.00 3397.00 40.00 84583 MLO 1999 12 01 20 23 00 6608-66 S co CCGG 99.860 -999.990 S.. R5 1999 12 08 13 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 84584 MLO 1999 12 10 19 54 00 6027-66 P co CCGG 95.810 -999.990 ... R5 1999 12 20 10 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84585 MLO 1999 12 10 19 54 00 6028-66 P co CCGG 95.830 -999.990 ... R5 1999 12 20 10 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 84586 MLO 1999 12 10 20 13 00 6283-66 S co CCGG 92.980 -999.990 S.. R5 1999 12 20 09 57 00 19.5300 -155.5800 3437.00 3397.00 40.00 84587 MLO 1999 12 10 20 13 00 6284-66 S co CCGG 92.560 -999.990 S.. R5 1999 12 20 10 11 00 19.5300 -155.5800 3437.00 3397.00 40.00 84588 MLO 1999 12 17 19 48 00 6045-66 P co CCGG 97.420 -999.990 ... R5 1999 12 28 15 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 84589 MLO 1999 12 17 19 48 00 6046-66 P co CCGG 97.460 -999.990 ... R5 1999 12 28 15 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 84590 MLO 1999 12 17 20 09 00 6871-66 S co CCGG 92.830 -999.990 S.. R5 1999 12 28 15 16 00 19.5300 -155.5800 3437.00 3397.00 40.00 84591 MLO 1999 12 17 20 09 00 6872-66 S co CCGG 94.650 -999.990 S.. R5 1999 12 28 15 29 00 19.5300 -155.5800 3437.00 3397.00 40.00 84592 MLO 1999 12 22 19 44 00 6345-66 P co CCGG 94.950 -999.990 P.. R5 2000 01 03 16 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 84593 MLO 1999 12 22 19 44 00 6346-66 P co CCGG 92.010 -999.990 P.. R5 2000 01 03 16 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 84594 MLO 1999 12 22 20 11 00 6529-66 S co CCGG 95.350 -999.990 S.. R5 2000 01 03 14 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 84595 MLO 1999 12 22 20 11 00 6530-66 S co CCGG 94.360 -999.990 S.. R5 2000 01 03 14 53 00 19.5300 -155.5800 3437.00 3397.00 40.00 84596 MLO 1999 12 29 19 51 00 6001-66 P co CCGG 116.120 -999.990 ... R5 2000 01 12 13 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 84597 MLO 1999 12 29 19 51 00 6002-66 P co CCGG 114.380 -999.990 ... R5 2000 01 12 13 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 84598 MLO 1999 12 29 20 11 00 6637-66 S co CCGG 111.860 -999.990 S.. R5 2000 01 12 12 12 00 19.5300 -155.5800 3437.00 3397.00 40.00 84599 MLO 1999 12 29 20 11 00 6638-66 S co CCGG 110.070 -999.990 S.. R5 2000 01 12 12 25 00 19.5300 -155.5800 3437.00 3397.00 40.00 84600 MLO 2000 01 07 19 49 00 6445-66 P co CCGG 97.450 -999.990 ... R5 2000 01 19 16 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 84601 MLO 2000 01 07 19 49 00 6446-66 P co CCGG 99.180 -999.990 ... R5 2000 01 19 16 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 84602 MLO 2000 01 07 20 10 00 6275-66 S co CCGG 100.230 -999.990 S.. R5 2000 01 19 15 35 00 19.5300 -155.5800 3437.00 3397.00 40.00 84603 MLO 2000 01 07 20 10 00 6276-66 S co CCGG 99.470 -999.990 S.. R5 2000 01 19 15 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 84604 MLO 2000 01 14 20 18 00 6035-66 S co CCGG 89.330 -999.990 S.. R5 2000 01 24 14 37 00 19.5300 -155.5800 3437.00 3397.00 40.00 84605 MLO 2000 01 14 20 18 00 6036-66 S co CCGG 90.300 -999.990 S.. R5 2000 01 24 14 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 84606 MLO 2000 01 14 20 36 00 6559-66 P co CCGG 93.500 -999.990 ... R5 2000 01 24 12 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 84607 MLO 2000 01 14 20 36 00 6560-66 P co CCGG 92.370 -999.990 ... R5 2000 01 24 12 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 84608 MLO 2000 01 21 19 46 00 6203-66 P co CCGG 132.160 -999.990 ... R5 2000 01 27 12 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 84609 MLO 2000 01 21 19 46 00 6204-66 P co CCGG 131.180 -999.990 ... R5 2000 01 27 12 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 84610 MLO 2000 01 21 20 14 00 6091-66 S co CCGG 131.370 -999.990 S.. R5 2000 01 27 09 23 00 19.5300 -155.5800 3437.00 3397.00 40.00 84611 MLO 2000 01 21 20 14 00 6092-66 S co CCGG 131.000 -999.990 S.. R5 2000 01 27 09 37 00 19.5300 -155.5800 3437.00 3397.00 40.00 84612 MLO 2000 01 28 19 53 00 6333-66 P co CCGG 145.570 -999.990 .X. R5 2000 02 01 10 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 84613 MLO 2000 01 28 19 53 00 6334-66 P co CCGG 144.120 -999.990 .X. R5 2000 02 01 10 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 84614 MLO 2000 01 28 20 11 00 6229-66 S co CCGG 141.480 -999.990 S.. R5 2000 02 01 11 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84615 MLO 2000 01 28 20 11 00 6230-66 S co CCGG 142.130 -999.990 S.. R5 2000 02 01 11 27 00 19.5300 -155.5800 3437.00 3397.00 40.00 84616 MLO 2000 02 04 19 56 00 6389-66 P co CCGG 98.150 -999.990 ... R5 2000 02 15 12 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 84617 MLO 2000 02 04 19 56 00 6390-66 P co CCGG 97.070 -999.990 ... R5 2000 02 15 12 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84618 MLO 2000 02 04 20 16 00 6137-66 S co CCGG 97.410 -999.990 S.. R5 2000 02 15 11 18 00 19.5300 -155.5800 3437.00 3397.00 40.00 84619 MLO 2000 02 04 20 16 00 6138-66 S co CCGG 97.010 -999.990 S.. R5 2000 02 15 11 32 00 19.5300 -155.5800 3437.00 3397.00 40.00 84620 MLO 2000 02 11 19 42 00 6871-66 P co CCGG 105.240 -999.990 ... R5 2000 02 23 08 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 84621 MLO 2000 02 11 19 42 00 6872-66 P co CCGG 104.440 -999.990 ... R5 2000 02 23 09 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 84622 MLO 2000 02 11 20 12 00 6027-66 S co CCGG 117.340 -999.990 S.. R5 2000 02 23 09 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 84623 MLO 2000 02 11 20 12 00 6028-66 S co CCGG 116.670 -999.990 S.. R5 2000 02 23 09 40 00 19.5300 -155.5800 3437.00 3397.00 40.00 84624 MLO 2000 02 18 19 57 00 6053-66 P co CCGG 97.070 -999.990 ... R5 2000 02 29 10 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 84625 MLO 2000 02 18 19 57 00 6054-66 P co CCGG 96.890 -999.990 ... R5 2000 02 29 10 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 84626 MLO 2000 02 18 20 14 00 6637-66 S co CCGG 98.420 -999.990 S.. R5 2000 02 29 12 06 00 19.5300 -155.5800 3437.00 3397.00 40.00 84627 MLO 2000 02 18 20 14 00 6638-66 S co CCGG 96.960 -999.990 S.. R5 2000 02 29 12 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 84628 MLO 2000 02 25 19 48 00 6421-66 P co CCGG 123.450 -999.990 ... R5 2000 03 01 16 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 84629 MLO 2000 02 25 19 48 00 6422-66 P co CCGG 123.180 -999.990 ... R5 2000 03 01 16 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 84630 MLO 2000 02 25 20 21 00 6571-66 S co CCGG 120.640 -999.990 S.. R5 2000 03 02 09 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 84631 MLO 2000 02 25 20 21 00 6572-66 S co CCGG 122.190 -999.990 S.. R5 2000 03 02 10 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 84632 MLO 2000 03 03 19 43 00 6443-66 P co CCGG 128.980 -999.990 ... R5 2000 03 09 14 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 84633 MLO 2000 03 03 19 43 00 6444-66 P co CCGG 128.990 -999.990 ... R5 2000 03 09 15 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 84634 MLO 2000 03 03 20 16 00 6195-66 S co CCGG 127.140 -999.990 S.. R5 2000 03 09 14 29 00 19.5300 -155.5800 3437.00 3397.00 40.00 84635 MLO 2000 03 03 20 16 00 6196-66 S co CCGG 126.890 -999.990 S.. R5 2000 03 09 14 42 00 19.5300 -155.5800 3437.00 3397.00 40.00 84636 MLO 2000 03 10 19 38 00 6035-66 P co CCGG 84.350 -999.990 ... R5 2000 03 13 15 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 84637 MLO 2000 03 10 19 38 00 6036-66 P co CCGG 83.920 -999.990 ... R5 2000 03 13 15 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 84638 MLO 2000 03 10 20 17 00 6229-66 S co CCGG 84.180 -999.990 S.. R5 2000 03 13 14 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 84639 MLO 2000 03 10 20 17 00 6230-66 S co CCGG 82.140 -999.990 S.. R5 2000 03 13 14 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 84640 MLO 2000 03 17 19 58 00 6565-66 P co CCGG 141.420 -999.990 ... R5 2000 03 24 10 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 84641 MLO 2000 03 17 19 58 00 6566-66 P co CCGG 143.180 -999.990 ... R5 2000 03 24 11 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 84642 MLO 2000 03 17 20 15 00 6281-66 S co CCGG 141.820 -999.990 S.. R5 2000 03 24 11 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 84643 MLO 2000 03 17 20 15 00 6282-66 S co CCGG 146.250 -999.990 S.. R5 2000 03 24 11 32 00 19.5300 -155.5800 3437.00 3397.00 40.00 84644 MLO 2000 03 24 19 42 00 6265-66 P co CCGG 114.400 -999.990 ... R5 2000 03 29 13 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 84645 MLO 2000 03 24 19 42 00 6266-66 P co CCGG 116.430 -999.990 ... R5 2000 03 29 13 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 84646 MLO 2000 03 24 20 15 00 6899-66 S co CCGG 117.410 -999.990 S.. R5 2000 03 29 14 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 84647 MLO 2000 03 24 20 15 00 6900-66 S co CCGG 118.750 -999.990 S.. R5 2000 03 29 14 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84648 MLO 2000 03 31 19 42 00 6553-66 P co CCGG 106.650 -999.990 ... R5 2000 04 05 14 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 84649 MLO 2000 03 31 19 42 00 6554-66 P co CCGG 105.270 -999.990 ... R5 2000 04 05 14 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 84650 MLO 2000 03 31 20 14 00 6263-66 S co CCGG 107.560 -999.990 S.. R5 2000 04 05 14 07 00 19.5300 -155.5800 3437.00 3397.00 40.00 84651 MLO 2000 03 31 20 14 00 6264-66 S co CCGG 107.130 -999.990 S.. R5 2000 04 05 14 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 84652 MLO 2000 04 07 19 52 00 6367-66 P co CCGG 107.090 -999.990 ... R5 2000 04 13 11 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 84653 MLO 2000 04 07 19 52 00 6368-66 P co CCGG -999.990 -999.990 *.. R5 2000 04 13 11 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 84654 MLO 2000 04 07 20 11 00 6275-66 S co CCGG 107.900 -999.990 S.. R5 2000 04 14 09 29 00 19.5300 -155.5800 3437.00 3397.00 40.00 84655 MLO 2000 04 07 20 11 00 6276-66 S co CCGG 105.860 -999.990 S.. R5 2000 04 14 09 42 00 19.5300 -155.5800 3437.00 3397.00 40.00 84656 MLO 2000 04 14 19 45 00 6519-66 P co CCGG 196.410 -999.990 .X. R5 2000 04 19 10 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 84657 MLO 2000 04 14 19 45 00 6520-66 P co CCGG 196.380 -999.990 .X. R5 2000 04 19 10 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 84658 MLO 2000 04 14 20 12 00 6501-66 S co CCGG 147.480 -999.990 S.. R5 2000 04 19 09 57 00 19.5300 -155.5800 3437.00 3397.00 40.00 84659 MLO 2000 04 14 20 12 00 6502-66 S co CCGG 151.720 -999.990 S.. R5 2000 04 19 10 10 00 19.5300 -155.5800 3437.00 3397.00 40.00 84660 MLO 2000 04 21 19 37 00 6183-66 P co CCGG 116.010 -999.990 ... R5 2000 05 02 09 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 84661 MLO 2000 04 21 19 37 00 6184-66 P co CCGG 114.390 -999.990 ... R5 2000 05 02 10 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 84662 MLO 2000 04 21 20 09 00 6001-66 S co CCGG 112.750 -999.990 S.. R5 2000 05 02 09 32 00 19.5300 -155.5800 3437.00 3397.00 40.00 84663 MLO 2000 04 21 20 09 00 6002-66 S co CCGG 112.490 -999.990 S.. R5 2000 05 02 09 45 00 19.5300 -155.5800 3437.00 3397.00 40.00 84664 MLO 2000 04 28 19 48 00 6891-66 P co CCGG 108.380 -999.990 ... R5 2000 05 12 09 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 84665 MLO 2000 04 28 19 48 00 6892-66 P co CCGG 107.180 -999.990 ... R5 2000 05 12 09 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 84666 MLO 2000 04 28 20 10 00 6195-66 S co CCGG 105.550 -999.990 S.. R5 2000 05 12 10 37 00 19.5300 -155.5800 3437.00 3397.00 40.00 84667 MLO 2000 04 28 20 10 00 6196-66 S co CCGG 104.090 -999.990 S.. R5 2000 05 12 10 50 00 19.5300 -155.5800 3437.00 3397.00 40.00 84668 MLO 2000 05 05 19 37 00 6017-66 P co CCGG 84.120 -999.990 ... R5 2000 05 15 12 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 84669 MLO 2000 05 05 19 37 00 6018-66 P co CCGG 82.630 -999.990 ... R5 2000 05 15 12 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 84670 MLO 2000 05 05 20 13 00 6545-66 S co CCGG 79.960 -999.990 S.. R5 2000 05 15 10 43 00 19.5300 -155.5800 3437.00 3397.00 40.00 84671 MLO 2000 05 05 20 13 00 6546-66 S co CCGG 80.120 -999.990 S.. R5 2000 05 15 10 56 00 19.5300 -155.5800 3437.00 3397.00 40.00 84672 MLO 2000 05 12 19 48 00 6445-66 P co CCGG 96.370 -999.990 ... R5 2000 05 17 11 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 84673 MLO 2000 05 12 19 48 00 6446-66 P co CCGG 97.720 -999.990 ... R5 2000 05 17 11 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 84674 MLO 2000 05 12 20 16 00 6717-66 S co CCGG 89.430 -999.990 S.. R5 2000 05 17 14 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84675 MLO 2000 05 12 20 16 00 6718-66 S co CCGG 87.150 -999.990 S.. R5 2000 05 17 14 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 84676 MLO 2000 05 19 19 53 00 6119-66 P co CCGG 85.440 -999.990 ... R5 2000 05 25 15 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 84677 MLO 2000 05 19 19 53 00 6120-66 P co CCGG 83.700 -999.990 ... R5 2000 05 25 15 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 84678 MLO 2000 05 19 20 10 00 6665-66 S co CCGG -999.990 -999.990 *.. R5 2000 05 25 15 38 00 19.5300 -155.5800 3437.00 3397.00 40.00 84679 MLO 2000 05 19 20 10 00 6666-66 S co CCGG 79.990 -999.990 S.. R5 2000 05 25 15 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 84680 MLO 2000 05 26 19 38 00 6111-66 P co CCGG -999.990 -999.990 *.. R5 2000 05 31 14 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 84681 MLO 2000 05 26 19 38 00 6112-66 P co CCGG 80.630 -999.990 ... R5 2000 05 31 14 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84682 MLO 2000 05 26 20 13 00 6493-66 S co CCGG 78.900 -999.990 S.. R5 2000 05 31 13 47 00 19.5300 -155.5800 3437.00 3397.00 40.00 84683 MLO 2000 05 26 20 13 00 6494-66 S co CCGG 79.170 -999.990 S.. R5 2000 05 31 14 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84684 MLO 2000 06 02 19 54 00 6265-66 P co CCGG 88.400 -999.990 ... R5 2000 06 08 12 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84685 MLO 2000 06 02 19 54 00 6266-66 P co CCGG 86.720 -999.990 ... R5 2000 06 08 12 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 84686 MLO 2000 06 02 20 08 00 6923-66 S co CCGG 88.400 -999.990 S.. R5 2000 06 08 12 52 00 19.5300 -155.5800 3437.00 3397.00 40.00 84687 MLO 2000 06 02 20 08 00 6924-66 S co CCGG 85.040 -999.990 S.. R5 2000 06 08 13 05 00 19.5300 -155.5800 3437.00 3397.00 40.00 84688 MLO 2000 06 09 19 42 00 6593-66 P co CCGG 97.910 -999.990 ... R5 2000 06 15 11 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 84689 MLO 2000 06 09 19 42 00 6594-66 P co CCGG 97.060 -999.990 ... R5 2000 06 15 12 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 84690 MLO 2000 06 09 20 12 00 6061-66 S co CCGG 92.710 -999.990 S.. R5 2000 06 15 12 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84691 MLO 2000 06 09 20 12 00 6062-66 S co CCGG 91.680 -999.990 S.. R5 2000 06 15 12 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 84692 MLO 2000 06 16 19 37 00 6765-66 P co CCGG 79.330 -999.990 ... R5 2000 06 22 15 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 84693 MLO 2000 06 16 19 37 00 6766-66 P co CCGG 78.360 -999.990 ... R5 2000 06 22 15 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 84694 MLO 2000 06 16 20 15 00 6577-66 S co CCGG 71.680 -999.990 S.. R5 2000 06 22 16 17 00 19.5300 -155.5800 3437.00 3397.00 40.00 84695 MLO 2000 06 16 20 15 00 6578-66 S co CCGG 73.180 -999.990 S.. R5 2000 06 22 16 30 00 19.5300 -155.5800 3437.00 3397.00 40.00 84696 MLO 2000 06 23 19 48 00 6233-66 P co CCGG 89.950 -999.990 ... R5 2000 06 28 11 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 84697 MLO 2000 06 23 19 48 00 6234-66 P co CCGG 88.760 -999.990 ... R5 2000 06 28 12 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 84698 MLO 2000 06 23 20 14 00 6735-66 S co CCGG 89.920 -999.990 S.. R5 2000 06 28 12 32 00 19.5300 -155.5800 3437.00 3397.00 40.00 84699 MLO 2000 06 23 20 14 00 6736-66 S co CCGG 88.940 -999.990 S.. R5 2000 06 28 12 45 00 19.5300 -155.5800 3437.00 3397.00 40.00 84700 MLO 2000 06 30 19 38 00 6545-66 P co CCGG 78.040 -999.990 ... R5 2000 07 07 09 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 84701 MLO 2000 06 30 19 38 00 6546-66 P co CCGG 77.300 -999.990 ... R5 2000 07 07 09 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84702 MLO 2000 06 30 20 13 00 6195-66 S co CCGG 74.430 -999.990 S.. R5 2000 07 07 08 47 00 19.5300 -155.5800 3437.00 3397.00 40.00 84703 MLO 2000 06 30 20 13 00 6196-66 S co CCGG 73.860 -999.990 S.. R5 2000 07 07 09 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84704 MLO 2000 07 07 19 57 00 1233-91 P co CCGG 76.710 -999.990 ... R5 2000 07 13 11 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84705 MLO 2000 07 07 19 57 00 1234-91 P co CCGG 76.280 -999.990 ... R5 2000 07 13 11 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 84706 MLO 2000 07 07 20 13 00 4021-91 S co CCGG 76.530 -999.990 S.. R5 2000 07 13 11 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84707 MLO 2000 07 07 20 13 00 4022-91 S co CCGG 75.690 -999.990 S.. R5 2000 07 13 11 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84708 MLO 2000 07 14 19 38 00 335-91 P co CCGG 71.230 -999.990 ... R5 2000 07 19 12 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 84709 MLO 2000 07 14 19 38 00 336-91 P co CCGG 69.090 -999.990 ... R5 2000 07 19 13 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 84710 MLO 2000 07 14 20 12 00 79-98 S co CCGG 65.960 -999.990 S.. R5 2000 07 19 14 47 00 19.5300 -155.5800 3437.00 3397.00 40.00 84711 MLO 2000 07 14 20 12 00 80-98 S co CCGG 66.020 -999.990 S.. R5 2000 07 19 15 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84712 MLO 2000 07 21 19 35 00 1595-91 P co CCGG 67.250 -999.990 ... R5 2000 07 27 12 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 84713 MLO 2000 07 21 19 35 00 1596-91 P co CCGG 66.750 -999.990 ... R5 2000 07 27 12 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 84714 MLO 2000 07 21 20 14 00 1151-91 S co CCGG 65.020 -999.990 S.. R5 2000 07 27 11 36 00 19.5300 -155.5800 3437.00 3397.00 40.00 84715 MLO 2000 07 21 20 14 00 1152-91 S co CCGG 63.640 -999.990 S.. R5 2000 07 27 11 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 84716 MLO 2000 07 28 19 38 00 4807-91 P co CCGG 72.430 -999.990 ... R5 2000 08 03 12 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 84717 MLO 2000 07 28 19 38 00 4808-91 P co CCGG 71.970 -999.990 ... R5 2000 08 03 12 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 84718 MLO 2000 07 28 20 13 00 4189-91 S co CCGG 70.360 -999.990 S.. R5 2000 08 03 12 48 00 19.5300 -155.5800 3437.00 3397.00 40.00 84719 MLO 2000 07 28 20 13 00 4190-91 S co CCGG 70.620 -999.990 S.. R5 2000 08 03 13 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 84720 MLO 2000 08 04 19 44 00 93-91 P co CCGG 77.360 -999.990 ... R5 2000 08 14 13 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 84721 MLO 2000 08 04 19 44 00 94-91 P co CCGG 76.300 -999.990 ... R5 2000 08 14 13 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84722 MLO 2000 08 04 20 20 00 779-91 S co CCGG 71.040 -999.990 S.. R5 2000 08 14 14 43 00 19.5300 -155.5800 3437.00 3397.00 40.00 84723 MLO 2000 08 04 20 20 00 780-91 S co CCGG 70.900 -999.990 S.. R5 2000 08 14 14 56 00 19.5300 -155.5800 3437.00 3397.00 40.00 84724 MLO 2000 08 11 19 53 00 501-91 P co CCGG 78.980 -999.990 ... R5 2000 08 21 09 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 84725 MLO 2000 08 11 19 53 00 502-91 P co CCGG 78.090 -999.990 ... R5 2000 08 21 09 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 84726 MLO 2000 08 11 20 16 00 1429-91 S co CCGG 73.640 -999.990 S.. R5 2000 08 18 14 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84727 MLO 2000 08 11 20 16 00 1430-91 S co CCGG 74.360 -999.990 S.. R5 2000 08 18 14 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 84728 MLO 2000 08 18 20 06 00 39-98 P co CCGG 69.020 -999.990 ... R5 2000 08 28 10 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 84729 MLO 2000 08 18 20 06 00 40-98 P co CCGG 68.040 -999.990 ... R5 2000 08 28 10 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 84730 MLO 2000 08 18 20 59 00 1341-91 S co CCGG 67.560 -999.990 S.. R5 2000 08 28 10 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 84731 MLO 2000 08 18 20 59 00 1342-91 S co CCGG 66.320 -999.990 S.. R5 2000 08 28 10 17 00 19.5300 -155.5800 3437.00 3397.00 40.00 84732 MLO 2000 08 25 20 07 00 51-91 P co CCGG 64.580 -999.990 ... R5 2000 09 05 12 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 84733 MLO 2000 08 25 20 07 00 52-91 P co CCGG 64.010 -999.990 ... R5 2000 09 05 12 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 84734 MLO 2000 08 25 20 20 00 4331-91 S co CCGG 62.660 -999.990 S.. R5 2000 09 05 11 43 00 19.5300 -155.5800 3437.00 3397.00 40.00 84735 MLO 2000 08 25 20 20 00 4332-91 S co CCGG 62.270 -999.990 S.. R5 2000 09 05 11 56 00 19.5300 -155.5800 3437.00 3397.00 40.00 84736 MLO 2000 09 01 19 35 00 4683-91 P co CCGG 67.340 -999.990 ... R5 2000 09 06 13 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 84737 MLO 2000 09 01 19 35 00 4684-91 P co CCGG 65.900 -999.990 ... R5 2000 09 06 14 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 84738 MLO 2000 09 01 20 09 00 327-91 S co CCGG 62.670 -999.990 S.. R5 2000 09 06 14 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 84739 MLO 2000 09 01 20 09 00 328-91 S co CCGG 62.400 -999.990 S.. R5 2000 09 06 14 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 84740 MLO 2000 09 08 19 42 00 4449-91 P co CCGG 65.210 -999.990 ... R5 2000 09 15 14 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 84741 MLO 2000 09 08 19 42 00 4450-91 P co CCGG 63.730 -999.990 ... R5 2000 09 15 14 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 84742 MLO 2000 09 08 20 12 00 259-91 S co CCGG 61.800 -999.990 S.. R5 2000 09 15 13 17 00 19.5300 -155.5800 3437.00 3397.00 40.00 84743 MLO 2000 09 08 20 12 00 260-91 S co CCGG 63.010 -999.990 S.. R5 2000 09 15 13 30 00 19.5300 -155.5800 3437.00 3397.00 40.00 84744 MLO 2000 09 15 20 37 00 4229-91 P co CCGG 70.290 -999.990 ... R5 2000 09 21 13 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 84745 MLO 2000 09 15 20 37 00 4230-91 P co CCGG 68.970 -999.990 ... R5 2000 09 21 14 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 84746 MLO 2000 09 15 21 10 00 1377-91 S co CCGG 70.650 -999.990 S.. R5 2000 09 21 13 30 00 19.5300 -155.5800 3437.00 3397.00 40.00 84747 MLO 2000 09 15 21 10 00 1378-91 S co CCGG 69.420 -999.990 S.. R5 2000 09 21 13 43 00 19.5300 -155.5800 3437.00 3397.00 40.00 84748 MLO 2000 09 22 19 48 00 859-91 P co CCGG 70.920 -999.990 ... R5 2000 10 04 10 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 84749 MLO 2000 09 22 19 48 00 860-91 P co CCGG 70.160 -999.990 ... R5 2000 10 04 10 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 84750 MLO 2000 09 22 20 12 00 4959-91 S co CCGG 65.260 -999.990 S.. R5 2000 10 04 10 15 00 19.5300 -155.5800 3437.00 3397.00 40.00 84751 MLO 2000 09 22 20 12 00 4960-91 S co CCGG 65.380 -999.990 S.. R5 2000 10 04 10 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 84752 MLO 2000 09 29 19 50 00 767-91 P co CCGG 17.690 -999.990 A.C R5 2000 10 05 14 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 84753 MLO 2000 09 29 19 50 00 767-91 P co CCGG 76.350 -999.990 ... R5 2000 10 06 09 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 84753 MLO 2000 09 29 19 50 00 768-91 P co CCGG 74.760 -999.990 ... R5 2000 10 05 14 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 84754 MLO 2000 09 29 20 12 00 4091-91 S co CCGG 72.380 -999.990 S.. R5 2000 10 05 14 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 84755 MLO 2000 09 29 20 12 00 4092-91 S co CCGG 70.830 -999.990 S.. R5 2000 10 05 14 17 00 19.5300 -155.5800 3437.00 3397.00 40.00 84756 MLO 2000 10 06 19 43 00 1697-91 P co CCGG 96.250 -999.990 ... R5 2000 10 12 11 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 84757 MLO 2000 10 06 19 43 00 1698-91 P co CCGG 95.770 -999.990 ... R5 2000 10 12 12 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 84758 MLO 2000 10 06 20 16 00 1046-91 S co CCGG 80.310 -999.990 S.. R5 2000 10 12 14 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 84759 MLO 2000 10 13 20 12 00 295-91 S co CCGG 81.680 -999.990 S.. R5 2000 10 23 10 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84760 MLO 2000 10 13 20 12 00 296-91 S co CCGG 81.050 -999.990 S.. R5 2000 10 23 10 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 84761 MLO 2000 10 13 20 28 00 1491-91 P co CCGG 86.100 -999.990 ... R5 2000 10 23 09 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 84762 MLO 2000 10 13 20 28 00 1492-91 P co CCGG 84.910 -999.990 ... R5 2000 10 23 10 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 84763 MLO 2000 10 27 19 35 00 4685-91 P co CCGG 83.040 -999.990 ... R5 2000 11 03 11 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 84764 MLO 2000 10 27 19 35 00 4686-91 P co CCGG 82.430 -999.990 ... R5 2000 11 03 11 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 84765 MLO 2000 10 27 20 10 00 1941-91 S co CCGG 79.830 -999.990 S.. R5 2000 11 03 11 34 00 19.5300 -155.5800 3437.00 3397.00 40.00 84766 MLO 2000 10 27 20 10 00 1942-91 S co CCGG 80.570 -999.990 S.. R5 2000 11 03 11 47 00 19.5300 -155.5800 3437.00 3397.00 40.00 84767 MLO 2000 11 17 19 40 00 5-91 P co CCGG 94.520 -999.990 ... R5 2000 11 27 12 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 84768 MLO 2000 11 17 19 40 00 6-91 P co CCGG 93.280 -999.990 ... R5 2000 11 27 12 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 84769 MLO 2000 11 17 20 06 00 4815-91 S co CCGG 94.150 -999.990 S.. R5 2000 11 27 11 38 00 19.5300 -155.5800 3437.00 3397.00 40.00 84770 MLO 2000 11 17 20 06 00 4816-91 S co CCGG 93.580 -999.990 S.. R5 2000 11 27 11 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 84771 MLO 2000 11 24 19 39 00 4941-91 P co CCGG 79.280 -999.990 ... R5 2000 11 28 13 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 84772 MLO 2000 11 24 19 39 00 4942-91 P co CCGG 79.410 -999.990 ... R5 2000 11 28 13 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 84773 MLO 2000 11 24 20 11 00 797-91 S co CCGG 76.420 -999.990 S.. R5 2000 11 28 13 37 00 19.5300 -155.5800 3437.00 3397.00 40.00 84774 MLO 2000 11 24 20 11 00 798-91 S co CCGG 76.060 -999.990 S.. R5 2000 11 28 13 50 00 19.5300 -155.5800 3437.00 3397.00 40.00 84775 MLO 2000 12 01 19 56 00 4215-91 P co CCGG 87.870 -999.990 ... R5 2000 12 14 12 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 84776 MLO 2000 12 01 19 56 00 4216-91 P co CCGG 88.300 -999.990 ... R5 2000 12 14 12 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 84777 MLO 2000 12 01 20 13 00 1373-91 S co CCGG 84.710 -999.990 S.. R5 2000 12 14 12 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 84778 MLO 2000 12 01 20 13 00 1374-91 S co CCGG 85.040 -999.990 S.. R5 2000 12 14 13 12 00 19.5300 -155.5800 3437.00 3397.00 40.00 84779 MLO 2000 12 15 19 53 00 4931-91 P co CCGG 90.430 -999.990 ... R5 2000 12 26 08 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 84780 MLO 2000 12 15 19 53 00 4932-91 P co CCGG 89.630 -999.990 ... R5 2000 12 26 09 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 84781 MLO 2000 12 15 20 13 00 759-91 S co CCGG 88.410 -999.990 S.. R5 2000 12 26 09 16 00 19.5300 -155.5800 3437.00 3397.00 40.00 84782 MLO 2000 12 15 20 13 00 760-91 S co CCGG 86.870 -999.990 S.. R5 2000 12 26 09 30 00 19.5300 -155.5800 3437.00 3397.00 40.00 84783 MLO 2000 12 22 19 49 00 4163-91 P co CCGG 87.660 -999.990 ... R5 2001 01 03 11 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 84784 MLO 2000 12 22 19 49 00 4164-91 P co CCGG 86.360 -999.990 ... R5 2001 01 03 12 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 84785 MLO 2000 12 22 20 13 00 449-91 S co CCGG 87.270 -999.990 S.. R5 2001 01 03 11 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 84786 MLO 2000 12 22 20 13 00 450-91 S co CCGG 85.590 -999.990 S.. R5 2001 01 03 11 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 84787 MLO 2000 12 29 19 35 00 4961-91 P co CCGG 99.220 -999.990 ... R5 2001 01 08 13 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 84788 MLO 2000 12 29 19 35 00 4962-91 P co CCGG 98.260 -999.990 ... R5 2001 01 08 13 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 84789 MLO 2000 12 29 20 09 00 1163-91 S co CCGG 100.960 -999.990 S.. R5 2001 01 08 11 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 84790 MLO 2000 12 29 20 09 00 1164-91 S co CCGG 101.190 -999.990 S.. R5 2001 01 08 11 15 00 19.5300 -155.5800 3437.00 3397.00 40.00 84791 MLO 2001 01 05 19 45 00 1233-91 P co CCGG 102.580 -999.990 ... R5 2001 01 12 15 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 84792 MLO 2001 01 05 19 45 00 1234-91 P co CCGG 101.680 -999.990 ... R5 2001 01 12 15 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84793 MLO 2001 01 05 20 09 00 4719-91 S co CCGG 100.650 -999.990 S.. R5 2001 01 12 15 41 00 19.5300 -155.5800 3437.00 3397.00 40.00 84794 MLO 2001 01 05 20 09 00 4720-91 S co CCGG 100.730 -999.990 S.. R5 2001 01 12 15 54 00 19.5300 -155.5800 3437.00 3397.00 40.00 84795 MLO 2001 01 12 19 55 00 1905-91 P co CCGG 92.790 -999.990 ... R5 2001 01 24 10 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 84796 MLO 2001 01 12 19 55 00 1906-91 P co CCGG 91.820 -999.990 ... R5 2001 01 24 10 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 84797 MLO 2001 01 12 20 11 00 4329-91 S co CCGG 93.960 -999.990 S.. R5 2001 01 24 10 36 00 19.5300 -155.5800 3437.00 3397.00 40.00 84798 MLO 2001 01 12 20 11 00 4330-91 S co CCGG 93.870 -999.990 S.. R5 2001 01 24 10 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 84799 MLO 2001 01 19 19 47 00 4847-91 P co CCGG 111.680 -999.990 P.. R5 2001 01 23 15 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 84800 MLO 2001 01 19 19 47 00 4848-91 P co CCGG 108.300 -999.990 P.. R5 2001 01 23 15 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 84801 MLO 2001 01 19 21 07 00 137-98 S co CCGG 101.570 -999.990 S.. R5 2001 01 23 16 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 84802 MLO 2001 01 26 19 43 00 4963-91 P co CCGG 132.020 -999.990 ... R5 2001 02 05 16 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 84803 MLO 2001 01 26 19 43 00 4964-91 P co CCGG 131.580 -999.990 ... R5 2001 02 05 16 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 84804 MLO 2001 01 26 20 08 00 1817-91 S co CCGG 124.050 -999.990 S.. R5 2001 02 05 16 07 00 19.5300 -155.5800 3437.00 3397.00 40.00 84805 MLO 2001 01 26 20 08 00 1818-91 S co CCGG 120.400 -999.990 S.. R5 2001 02 05 16 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 84806 MLO 2001 02 02 20 10 00 1459-91 P co CCGG 107.160 -999.990 ... R5 2001 02 06 15 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 84807 MLO 2001 02 02 20 10 00 1460-91 P co CCGG 104.950 -999.990 ... R5 2001 02 06 15 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 84808 MLO 2001 02 02 21 10 00 4585-91 S co CCGG 96.550 -999.990 S.. R5 2001 02 06 15 07 00 19.5300 -155.5800 3437.00 3397.00 40.00 84809 MLO 2001 02 02 21 10 00 4586-91 S co CCGG 96.390 -999.990 S.. R5 2001 02 06 15 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 84810 MLO 2001 02 09 19 53 00 269-99 P co CCGG 78.250 -999.990 ... R5 2001 02 14 16 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 84811 MLO 2001 02 09 19 53 00 270-99 P co CCGG 79.320 -999.990 ... R5 2001 02 14 16 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 84812 MLO 2001 02 09 20 09 00 267-99 S co CCGG 80.020 -999.990 S.. R5 2001 02 14 15 40 00 19.5300 -155.5800 3437.00 3397.00 40.00 84813 MLO 2001 02 09 20 09 00 268-99 S co CCGG 77.600 -999.990 S.. R5 2001 02 14 15 53 00 19.5300 -155.5800 3437.00 3397.00 40.00 84814 MLO 2001 02 16 20 09 00 4047-91 P co CCGG 159.880 -999.990 .X. R5 2001 02 26 14 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 84815 MLO 2001 02 16 20 09 00 4048-91 P co CCGG 160.740 -999.990 .X. R5 2001 02 26 14 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 84816 MLO 2001 02 16 20 22 00 1671-91 S co CCGG 184.410 -999.990 S.. R5 2001 02 26 14 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84817 MLO 2001 02 16 20 22 00 1672-91 S co CCGG 182.260 -999.990 S.. R5 2001 02 26 14 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 84818 MLO 2001 02 23 19 51 00 479-91 P co CCGG 115.160 -999.990 ... R5 2001 03 05 10 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 84819 MLO 2001 02 23 19 51 00 480-91 P co CCGG 114.750 -999.990 ... R5 2001 03 05 10 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 84820 MLO 2001 02 23 20 12 00 4761-91 S co CCGG 108.240 -999.990 S.. R5 2001 03 05 09 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 84821 MLO 2001 02 23 20 12 00 4762-91 S co CCGG 109.700 -999.990 S.. R5 2001 03 05 10 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 84822 MLO 2001 02 28 19 57 00 4707-91 P co CCGG 126.140 -999.990 P.. R5 2001 03 07 11 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 84823 MLO 2001 02 28 19 57 00 4708-91 P co CCGG 123.040 -999.990 P.. R5 2001 03 07 12 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 84824 MLO 2001 02 28 20 10 00 4595-91 S co CCGG 122.120 -999.990 S.. R5 2001 03 07 11 23 00 19.5300 -155.5800 3437.00 3397.00 40.00 84825 MLO 2001 02 28 20 10 00 4596-91 S co CCGG 122.340 -999.990 S.. R5 2001 03 07 11 36 00 19.5300 -155.5800 3437.00 3397.00 40.00 84826 MLO 2001 03 07 19 54 00 4807-91 P co CCGG 123.900 -999.990 ... R5 2001 03 16 14 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 84827 MLO 2001 03 07 19 54 00 4808-91 P co CCGG 123.090 -999.990 ... R5 2001 03 16 14 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 84828 MLO 2001 03 07 20 09 00 1043-91 S co CCGG 127.180 -999.990 S.. R5 2001 03 16 14 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 84829 MLO 2001 03 07 20 09 00 1044-91 S co CCGG 126.130 -999.990 S.. R5 2001 03 16 15 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 84830 MLO 2001 03 14 19 45 00 4217-91 P co CCGG 139.400 -999.990 ... R5 2001 03 26 13 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 84831 MLO 2001 03 14 19 45 00 4218-91 P co CCGG 138.680 -999.990 ... R5 2001 03 26 13 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 84832 MLO 2001 03 14 20 07 00 4891-91 S co CCGG 135.380 -999.990 S.. R5 2001 03 26 12 50 00 19.5300 -155.5800 3437.00 3397.00 40.00 84833 MLO 2001 03 14 20 07 00 4892-91 S co CCGG 134.770 -999.990 S.. R5 2001 03 26 13 03 00 19.5300 -155.5800 3437.00 3397.00 40.00 84834 MLO 2001 03 21 20 03 00 155-99 P co CCGG 131.530 -999.990 ... R5 2001 03 29 09 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 84835 MLO 2001 03 21 20 03 00 156-99 P co CCGG 131.870 -999.990 ... R5 2001 03 29 10 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 84836 MLO 2001 03 21 20 19 00 1031-91 S co CCGG 132.000 -999.990 S.. R5 2001 03 29 09 31 00 19.5300 -155.5800 3437.00 3397.00 40.00 84837 MLO 2001 03 21 20 19 00 1032-91 S co CCGG 132.430 -999.990 S.. R5 2001 03 29 09 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 84838 MLO 2001 03 28 19 39 00 1811-91 P co CCGG 101.040 -999.990 ... R5 2001 04 06 09 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 84839 MLO 2001 03 28 19 39 00 1812-91 P co CCGG 99.700 -999.990 ... R5 2001 04 06 09 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84840 MLO 2001 03 28 20 03 00 1111-91 S co CCGG -999.990 -999.990 *.. R5 2001 04 05 13 17 00 19.5300 -155.5800 3437.00 3397.00 40.00 84841 MLO 2001 03 28 20 03 00 1112-91 S co CCGG 99.590 -999.990 S.. R5 2001 04 05 13 30 00 19.5300 -155.5800 3437.00 3397.00 40.00 84842 MLO 2001 04 04 19 57 00 4841-91 P co CCGG 104.920 -999.990 ... R5 2001 04 13 10 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84843 MLO 2001 04 04 19 57 00 4842-91 P co CCGG 104.450 -999.990 ... R5 2001 04 13 10 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 84844 MLO 2001 04 04 20 11 00 4019-91 S co CCGG 106.890 -999.990 S.. R5 2001 04 13 09 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 84845 MLO 2001 04 04 20 11 00 4020-91 S co CCGG 104.600 -999.990 S.. R5 2001 04 13 09 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 84846 MLO 2001 04 11 19 40 00 1741-91 P co CCGG 143.240 -999.990 ... R5 2001 04 24 12 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 84847 MLO 2001 04 11 19 40 00 1742-91 P co CCGG 141.040 -999.990 ... R5 2001 04 24 13 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 84848 MLO 2001 04 11 20 09 00 637-91 S co CCGG 142.780 -999.990 S.. R5 2001 04 24 12 22 00 19.5300 -155.5800 3437.00 3397.00 40.00 84849 MLO 2001 04 11 20 09 00 638-91 S co CCGG 140.960 -999.990 S.. R5 2001 04 24 12 35 00 19.5300 -155.5800 3437.00 3397.00 40.00 84850 MLO 2001 04 18 19 47 00 4797-91 P co CCGG 126.370 -999.990 ... R5 2001 04 25 08 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 84851 MLO 2001 04 18 19 47 00 4798-91 P co CCGG 124.310 -999.990 ... R5 2001 04 25 09 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 84852 MLO 2001 04 18 20 01 00 203-91 S co CCGG 128.510 -999.990 S.. R5 2001 04 25 11 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 84853 MLO 2001 04 18 20 01 00 204-91 S co CCGG 129.120 -999.990 S.. R5 2001 04 25 11 21 00 19.5300 -155.5800 3437.00 3397.00 40.00 84854 MLO 2001 04 25 19 35 00 120-91 P co CCGG 112.560 -999.990 ... R5 2001 04 30 14 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 84855 MLO 2001 04 25 20 08 00 277-91 S co CCGG 110.430 -999.990 S.. R5 2001 04 30 15 56 00 19.5300 -155.5800 3437.00 3397.00 40.00 84856 MLO 2001 04 25 20 08 00 278-91 S co CCGG 110.220 -999.990 S.. R5 2001 04 30 16 09 00 19.5300 -155.5800 3437.00 3397.00 40.00 84857 MLO 2001 05 02 19 47 00 1245-91 P co CCGG 119.350 -999.990 ... R5 2001 05 11 12 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 84858 MLO 2001 05 02 19 47 00 1246-91 P co CCGG 117.560 -999.990 ... R5 2001 05 11 12 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 84859 MLO 2001 05 02 20 08 00 4315-91 S co CCGG 117.330 -999.990 S.. R5 2001 05 11 13 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 84860 MLO 2001 05 02 20 08 00 4316-91 S co CCGG 116.790 -999.990 S.. R5 2001 05 11 13 21 00 19.5300 -155.5800 3437.00 3397.00 40.00 84861 MLO 2001 05 09 19 42 00 495-91 P co CCGG 106.820 -999.990 ... R5 2001 05 21 09 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 84862 MLO 2001 05 09 19 42 00 496-91 P co CCGG 106.420 -999.990 ... R5 2001 05 21 10 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 84863 MLO 2001 05 09 20 18 00 1041-91 S co CCGG 108.000 -999.990 S.. R5 2001 05 21 10 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 84864 MLO 2001 05 09 20 18 00 1042-91 S co CCGG 106.800 -999.990 S.. R5 2001 05 21 10 32 00 19.5300 -155.5800 3437.00 3397.00 40.00 84865 MLO 2001 05 16 19 47 00 231-91 P co CCGG 87.770 -999.990 ... R5 2001 05 25 13 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 84866 MLO 2001 05 16 19 47 00 232-91 P co CCGG 87.140 -999.990 ... R5 2001 05 25 13 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 84867 MLO 2001 05 16 20 09 00 4525-91 S co CCGG 85.470 -999.990 S.. R5 2001 05 25 12 58 00 19.5300 -155.5800 3437.00 3397.00 40.00 84868 MLO 2001 05 16 20 09 00 4526-91 S co CCGG 85.300 -999.990 S.. R5 2001 05 25 13 11 00 19.5300 -155.5800 3437.00 3397.00 40.00 84869 MLO 2001 05 23 19 46 00 701-91 P co CCGG 98.500 -999.990 P.. R5 2001 06 06 12 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 84870 MLO 2001 05 23 19 46 00 702-91 P co CCGG 94.830 -999.990 P.. R5 2001 06 06 12 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 84871 MLO 2001 05 23 20 06 00 7-98 S co CCGG 92.790 -999.990 S.. R5 2001 06 06 11 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 84872 MLO 2001 05 23 20 06 00 8-98 S co CCGG 90.490 -999.990 S.. R5 2001 06 06 11 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 84873 MLO 2001 05 30 19 43 00 165-91 P co CCGG 93.260 -999.990 ... R5 2001 06 08 10 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 84874 MLO 2001 05 30 19 43 00 166-91 P co CCGG 91.630 -999.990 ... R5 2001 06 08 10 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 84875 MLO 2001 05 30 20 00 00 1389-91 S co CCGG 90.630 -999.990 S.. R5 2001 06 07 15 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 84876 MLO 2001 05 30 20 00 00 1390-91 S co CCGG 90.500 -999.990 S.. R5 2001 06 07 15 17 00 19.5300 -155.5800 3437.00 3397.00 40.00 84877 MLO 2001 06 06 19 50 00 1991-91 P co CCGG 92.620 -999.990 ... R5 2001 06 13 13 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 84878 MLO 2001 06 06 19 50 00 1992-91 P co CCGG 91.930 -999.990 ... R5 2001 06 13 13 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 84879 MLO 2001 06 06 20 10 00 91-91 S co CCGG 87.900 -999.990 S.. R5 2001 06 13 13 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 84880 MLO 2001 06 06 20 10 00 92-91 S co CCGG 87.540 -999.990 S.. R5 2001 06 13 13 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84881 MLO 2001 06 13 19 45 00 1619-91 P co CCGG 80.470 -999.990 ... R5 2001 06 19 10 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 84882 MLO 2001 06 13 19 45 00 1620-91 P co CCGG 78.940 -999.990 ... R5 2001 06 19 10 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 84883 MLO 2001 06 13 20 08 00 1579-91 S co CCGG 79.160 -999.990 S.. R5 2001 06 19 12 35 00 19.5300 -155.5800 3437.00 3397.00 40.00 84884 MLO 2001 06 13 20 08 00 1580-91 S co CCGG 77.410 -999.990 S.. R5 2001 06 19 12 48 00 19.5300 -155.5800 3437.00 3397.00 40.00 84885 MLO 2001 06 20 19 41 00 1025-91 P co CCGG 86.350 -999.990 ... R5 2001 06 27 10 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 84886 MLO 2001 06 20 19 41 00 1026-91 P co CCGG 84.930 -999.990 ... R5 2001 06 27 10 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 84887 MLO 2001 06 20 20 08 00 1725-91 S co CCGG 84.850 -999.990 S.. R5 2001 06 27 10 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 84888 MLO 2001 06 20 20 08 00 1726-91 S co CCGG 84.000 -999.990 S.. R5 2001 06 27 10 21 00 19.5300 -155.5800 3437.00 3397.00 40.00 84889 MLO 2001 06 27 19 40 00 4605-91 P co CCGG 79.560 -999.990 ... R5 2001 07 02 10 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 84890 MLO 2001 06 27 19 40 00 4606-91 P co CCGG 78.350 -999.990 ... R5 2001 07 02 10 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 84891 MLO 2001 06 27 20 08 00 265-91 S co CCGG 75.220 -999.990 S.. R5 2001 07 02 10 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 84892 MLO 2001 06 27 20 08 00 266-91 S co CCGG 76.600 -999.990 S.. R5 2001 07 02 10 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 84893 MLO 2001 07 03 19 20 00 4927-91 S co CCGG 65.990 -999.990 S.. R5 2001 07 09 09 21 00 19.5300 -155.5800 3437.00 3397.00 40.00 84894 MLO 2001 07 03 19 20 00 4928-91 S co CCGG 65.870 -999.990 S.. R5 2001 07 09 09 34 00 19.5300 -155.5800 3437.00 3397.00 40.00 84895 MLO 2001 07 03 19 47 00 513-91 P co CCGG 68.930 -999.990 ... R5 2001 07 09 11 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 84896 MLO 2001 07 03 19 47 00 514-91 P co CCGG 68.080 -999.990 ... R5 2001 07 09 11 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 84897 MLO 2001 07 11 19 50 00 2055-91 P co CCGG 82.680 -999.990 ... R5 2001 07 16 11 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 84898 MLO 2001 07 11 19 50 00 2056-91 P co CCGG 81.930 -999.990 ... R5 2001 07 16 11 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 84899 MLO 2001 07 11 20 07 00 1029-91 S co CCGG 76.230 -999.990 S.. R5 2001 07 16 12 32 00 19.5300 -155.5800 3437.00 3397.00 40.00 84900 MLO 2001 07 11 20 07 00 1030-91 S co CCGG 75.910 -999.990 S.. R5 2001 07 16 12 45 00 19.5300 -155.5800 3437.00 3397.00 40.00 84901 MLO 2001 07 18 19 38 00 219-99 P co CCGG 82.180 -999.990 ... R5 2001 07 25 13 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 84902 MLO 2001 07 18 19 38 00 220-99 P co CCGG 81.350 -999.990 ... R5 2001 07 25 13 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 84903 MLO 2001 07 18 20 08 00 4833-91 S co CCGG 79.800 -999.990 S.. R5 2001 07 25 14 06 00 19.5300 -155.5800 3437.00 3397.00 40.00 84904 MLO 2001 07 18 20 08 00 4834-91 S co CCGG 79.190 -999.990 S.. R5 2001 07 25 14 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 84905 MLO 2001 07 25 19 44 00 273-99 P co CCGG 73.930 -999.990 ... R5 2001 08 01 13 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 84906 MLO 2001 07 25 19 44 00 274-99 P co CCGG 72.930 -999.990 ... R5 2001 08 01 13 49 00 19.5300 -155.5800 3402.00 3397.00 5.00 84907 MLO 2001 07 25 20 08 00 1677-91 S co CCGG 69.760 -999.990 S.. R5 2001 08 01 13 10 00 19.5300 -155.5800 3437.00 3397.00 40.00 84908 MLO 2001 07 25 20 08 00 1678-91 S co CCGG 69.350 -999.990 S.. R5 2001 08 01 13 23 00 19.5300 -155.5800 3437.00 3397.00 40.00 84909 MLO 2001 08 01 19 40 00 4101-91 P co CCGG 73.800 -999.990 P.. R5 2001 08 13 15 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 84910 MLO 2001 08 01 19 40 00 4102-91 P co CCGG 70.760 -999.990 P.. R5 2001 08 13 15 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 84911 MLO 2001 08 01 20 09 00 4499-91 S co CCGG 67.580 -999.990 S.. R5 2001 08 13 16 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 84912 MLO 2001 08 01 20 09 00 4500-91 S co CCGG 66.890 -999.990 S.. R5 2001 08 13 16 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 84913 MLO 2001 08 08 19 52 00 4867-91 P co CCGG 64.800 -999.990 ... R5 2001 08 17 10 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 84914 MLO 2001 08 08 19 52 00 4868-91 P co CCGG 62.780 -999.990 ... R5 2001 08 17 10 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 84915 MLO 2001 08 08 20 00 00 85-98 S co CCGG 60.900 -999.990 S.. R5 2001 08 17 11 00 00 19.5300 -155.5800 3437.00 3397.00 40.00 84916 MLO 2001 08 08 20 00 00 86-98 S co CCGG 60.530 -999.990 S.. R5 2001 08 17 11 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84917 MLO 2001 08 15 19 36 00 689-91 P co CCGG 67.670 -999.990 ... R5 2001 08 23 12 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 84918 MLO 2001 08 15 19 36 00 690-91 P co CCGG 66.160 -999.990 ... R5 2001 08 23 12 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 84919 MLO 2001 08 15 20 08 00 1355-91 S co CCGG 62.520 -999.990 S.. R5 2001 08 23 11 55 00 19.5300 -155.5800 3437.00 3397.00 40.00 84920 MLO 2001 08 15 20 08 00 1356-91 S co CCGG 63.610 -999.990 S.. R5 2001 08 23 12 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 84921 MLO 2001 08 22 19 53 00 1983-91 P co CCGG 64.900 -999.990 ... R5 2001 08 30 12 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 84922 MLO 2001 08 22 19 53 00 1984-91 P co CCGG 62.880 -999.990 ... R5 2001 08 30 12 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 84923 MLO 2001 08 22 20 09 00 69-98 S co CCGG 61.400 -999.990 S.. R5 2001 08 30 11 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 84924 MLO 2001 08 22 20 09 00 70-98 S co CCGG 60.710 -999.990 S.. R5 2001 08 30 12 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 84925 MLO 2001 08 29 19 54 00 4371-91 P co CCGG 69.190 -999.990 ... R5 2001 09 06 15 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 84926 MLO 2001 08 29 19 54 00 4372-91 P co CCGG 69.390 -999.990 ... R5 2001 09 06 15 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84927 MLO 2001 08 29 20 08 00 29-91 S co CCGG 67.250 -999.990 S.. R5 2001 09 06 14 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 84928 MLO 2001 08 29 20 08 00 30-91 S co CCGG 63.940 -999.990 S.. R5 2001 09 06 15 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 84929 MLO 2001 09 05 19 47 00 4971-91 P co CCGG 65.270 -999.990 ... R5 2001 09 17 13 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 84930 MLO 2001 09 05 19 47 00 4972-91 P co CCGG 64.080 -999.990 ... R5 2001 09 17 14 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 84931 MLO 2001 09 05 20 00 00 4423-91 S co CCGG 62.970 -999.990 S.. R5 2001 09 17 15 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 84932 MLO 2001 09 05 20 00 00 4424-91 S co CCGG 62.550 -999.990 S.. R5 2001 09 17 15 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 84933 MLO 2001 09 12 19 59 00 1407-91 P co CCGG 64.820 -999.990 ... R5 2001 09 24 13 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 84934 MLO 2001 09 12 19 59 00 1408-91 P co CCGG 63.300 -999.990 ... R5 2001 09 24 14 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 84935 MLO 2001 09 12 20 08 00 4145-91 S co CCGG 61.850 -999.990 S.. R5 2001 09 24 13 27 00 19.5300 -155.5800 3437.00 3397.00 40.00 84936 MLO 2001 09 12 20 08 00 4146-91 S co CCGG 61.610 -999.990 S.. R5 2001 09 24 13 40 00 19.5300 -155.5800 3437.00 3397.00 40.00 84937 MLO 2001 09 19 19 50 00 483-99 P co CCGG 84.360 -999.990 ... R5 2001 10 15 12 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 84938 MLO 2001 09 19 19 50 00 484-99 P co CCGG 84.290 -999.990 ... R5 2001 10 15 12 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 84939 MLO 2001 09 19 20 08 00 485-99 S co CCGG 79.360 -999.990 S.. R5 2001 10 15 16 31 00 19.5300 -155.5800 3437.00 3397.00 40.00 84940 MLO 2001 09 19 20 08 00 486-99 S co CCGG 78.890 -999.990 S.. R5 2001 10 15 16 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 84941 MLO 2001 09 26 19 43 00 679-91 P co CCGG 110.500 -999.990 ... R5 2001 10 04 17 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 84942 MLO 2001 09 26 19 43 00 680-91 P co CCGG 110.030 -999.990 ... R5 2001 10 04 17 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 84943 MLO 2001 10 03 19 50 00 673-91 P co CCGG 75.520 -999.990 ... R5 2001 10 19 16 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 84944 MLO 2001 10 03 19 50 00 674-91 P co CCGG 72.990 -999.990 ... R5 2001 10 19 16 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 84945 MLO 2001 10 10 20 11 00 397-99 S co CCGG 87.680 -999.990 S.. R5 2001 11 08 15 05 00 19.5300 -155.5800 3437.00 3397.00 40.00 84946 MLO 2001 10 10 20 22 00 1035-91 P co CCGG 88.420 -999.990 ... R5 2001 11 13 12 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 84947 MLO 2001 10 10 20 22 00 1036-91 P co CCGG 87.450 -999.990 ... R5 2001 11 13 12 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 84948 MLO 2001 10 17 19 53 00 617-91 P co CCGG 81.030 -999.990 ... R5 2001 11 06 13 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 84949 MLO 2001 10 17 19 53 00 618-91 P co CCGG 80.760 -999.990 ... R5 2001 11 06 13 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 84950 MLO 2001 10 17 20 01 00 1267-91 S co CCGG 75.190 -999.990 S.. R5 2001 11 06 13 37 00 19.5300 -155.5800 3437.00 3397.00 40.00 84951 MLO 2001 10 17 20 01 00 1268-91 S co CCGG 77.620 -999.990 S.. R5 2001 11 06 13 50 00 19.5300 -155.5800 3437.00 3397.00 40.00 84952 MLO 2001 10 24 19 51 00 369-99 P co CCGG 70.120 -999.990 ... R5 2001 11 28 12 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 84953 MLO 2001 10 24 19 51 00 370-99 P co CCGG 69.540 -999.990 ... R5 2001 11 28 12 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 84954 MLO 2001 10 24 20 09 00 529-91 S co CCGG 65.900 -999.990 S.. R5 2001 11 28 12 42 00 19.5300 -155.5800 3437.00 3397.00 40.00 84955 MLO 2001 10 24 20 09 00 530-91 S co CCGG 65.350 -999.990 S.. R5 2001 11 28 12 56 00 19.5300 -155.5800 3437.00 3397.00 40.00 84956 MLO 2001 10 31 19 57 00 1969-91 P co CCGG 90.680 -999.990 ... R5 2001 11 28 11 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 84957 MLO 2001 10 31 19 57 00 1970-91 P co CCGG 90.480 -999.990 ... R5 2001 11 28 11 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 84958 MLO 2001 10 31 20 03 00 593-91 S co CCGG 90.140 -999.990 S.. R5 2001 11 28 11 50 00 19.5300 -155.5800 3437.00 3397.00 40.00 84959 MLO 2001 10 31 20 03 00 594-91 S co CCGG 87.900 -999.990 S.. R5 2001 11 28 12 03 00 19.5300 -155.5800 3437.00 3397.00 40.00 84960 MLO 2001 11 07 19 49 00 729-91 P co CCGG 78.970 -999.990 ... R5 2001 11 23 10 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84961 MLO 2001 11 07 19 49 00 730-91 P co CCGG 77.870 -999.990 ... R5 2001 11 23 10 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 84962 MLO 2001 11 07 20 08 00 1355-91 S co CCGG 76.360 -999.990 S.. R5 2001 11 23 09 34 00 19.5300 -155.5800 3437.00 3397.00 40.00 84963 MLO 2001 11 07 20 08 00 1356-91 S co CCGG 76.520 -999.990 S.. R5 2001 11 23 09 47 00 19.5300 -155.5800 3437.00 3397.00 40.00 84964 MLO 2001 11 14 20 08 00 4541-91 P co CCGG 114.270 -999.990 ... R5 2001 11 21 09 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 84965 MLO 2001 11 14 20 08 00 4542-91 P co CCGG 112.760 -999.990 ... R5 2001 11 21 09 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 84966 MLO 2001 11 14 20 14 00 661-91 S co CCGG 109.370 -999.990 S.. R5 2001 11 21 10 03 00 19.5300 -155.5800 3437.00 3397.00 40.00 84967 MLO 2001 11 14 20 14 00 662-91 S co CCGG 109.690 -999.990 S.. R5 2001 11 21 10 16 00 19.5300 -155.5800 3437.00 3397.00 40.00 84968 MLO 2001 11 28 20 10 00 1735-91 S co CCGG 78.350 -999.990 S.. R5 2001 12 10 13 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 84969 MLO 2001 11 28 20 10 00 1736-91 S co CCGG 78.040 -999.990 S.. R5 2001 12 10 13 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 84970 MLO 2001 11 28 20 24 00 1129-91 P co CCGG 78.980 -999.990 ... R5 2001 12 10 13 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 84971 MLO 2001 11 28 20 24 00 1130-91 P co CCGG 79.370 -999.990 ... R5 2001 12 10 13 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 84972 MLO 2001 12 05 19 53 00 4203-91 P co CCGG 105.200 -999.990 ... R5 2001 12 14 15 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 84973 MLO 2001 12 05 19 53 00 4204-91 P co CCGG 102.890 -999.990 ... R5 2001 12 14 15 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84974 MLO 2001 12 05 20 13 00 2017-91 S co CCGG 96.750 -999.990 S.. R5 2001 12 14 15 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 84975 MLO 2001 12 05 20 13 00 2018-91 S co CCGG 97.510 -999.990 S.. R5 2001 12 14 15 52 00 19.5300 -155.5800 3437.00 3397.00 40.00 84976 MLO 2001 12 12 19 59 00 483-99 P co CCGG 124.790 -999.990 ... R5 2001 12 18 17 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 84977 MLO 2001 12 12 19 59 00 484-99 P co CCGG 124.950 -999.990 ... R5 2001 12 18 17 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 84978 MLO 2001 12 12 20 06 00 449-99 S co CCGG 124.310 -999.990 S.. R5 2001 12 18 16 41 00 19.5300 -155.5800 3437.00 3397.00 40.00 84979 MLO 2001 12 12 20 06 00 450-99 S co CCGG 124.470 -999.990 S.. R5 2001 12 18 16 54 00 19.5300 -155.5800 3437.00 3397.00 40.00 84980 MLO 2001 12 19 19 50 00 1139-91 P co CCGG 91.200 -999.990 ... R5 2002 01 03 17 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 84981 MLO 2001 12 19 19 50 00 1140-91 P co CCGG 91.800 -999.990 ... R5 2002 01 03 17 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 84982 MLO 2001 12 19 20 08 00 4575-91 S co CCGG 86.640 -999.990 S.. R5 2002 01 04 10 55 00 19.5300 -155.5800 3437.00 3397.00 40.00 84983 MLO 2001 12 19 20 08 00 4576-91 S co CCGG 86.230 -999.990 S.. R5 2002 01 04 11 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 84984 MLO 2001 12 26 19 57 00 1743-91 P co CCGG 109.370 -999.990 ... R5 2002 01 10 16 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 84985 MLO 2001 12 26 19 57 00 1744-91 P co CCGG 106.950 -999.990 ... R5 2002 01 10 16 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 84986 MLO 2001 12 26 20 13 00 493-91 S co CCGG 102.300 -999.990 S.. R5 2002 01 11 11 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 84987 MLO 2001 12 26 20 13 00 494-91 S co CCGG 103.140 -999.990 S.. R5 2002 01 11 11 15 00 19.5300 -155.5800 3437.00 3397.00 40.00 84988 MLO 2002 01 02 19 45 00 2033-91 P co CCGG 92.250 -999.990 ... R5 2002 01 14 16 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 84989 MLO 2002 01 02 19 45 00 2034-91 P co CCGG 91.610 -999.990 ... R5 2002 01 14 16 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 84990 MLO 2002 01 02 20 10 00 4273-91 S co CCGG 88.720 -999.990 S.. R5 2002 01 14 15 55 00 19.5300 -155.5800 3437.00 3397.00 40.00 84991 MLO 2002 01 02 20 10 00 4274-91 S co CCGG 87.620 -999.990 S.. R5 2002 01 14 16 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 84992 MLO 2002 01 09 19 51 00 1681-91 P co CCGG 101.830 -999.990 P.. R5 2002 01 18 10 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 84993 MLO 2002 01 09 19 51 00 1682-91 P co CCGG 98.880 -999.990 P.. R5 2002 01 18 10 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 84994 MLO 2002 01 09 20 08 00 4843-98 S co CCGG 95.300 -999.990 S.. R5 2002 01 18 12 36 00 19.5300 -155.5800 3437.00 3397.00 40.00 84995 MLO 2002 01 09 20 08 00 4844-98 S co CCGG 96.320 -999.990 S.. R5 2002 01 18 12 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 84996 MLO 2002 01 16 19 54 00 1205-91 P co CCGG 115.480 -999.990 ... R5 2002 01 24 15 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 84997 MLO 2002 01 16 19 54 00 1206-91 P co CCGG 114.140 -999.990 ... R5 2002 01 24 15 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 84998 MLO 2002 01 16 20 00 00 4905-91 S co CCGG 111.990 -999.990 S.. R5 2002 01 24 16 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 84999 MLO 2002 01 16 20 00 00 4906-91 S co CCGG 111.640 -999.990 S.. R5 2002 01 24 16 57 00 19.5300 -155.5800 3437.00 3397.00 40.00 85000 MLO 2002 01 23 19 56 00 4137-91 P co CCGG 98.810 -999.990 ... R5 2002 01 31 15 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 85001 MLO 2002 01 23 19 56 00 4138-91 P co CCGG 98.640 -999.990 ... R5 2002 01 31 15 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 85002 MLO 2002 01 23 20 06 00 1843-91 S co CCGG 95.800 -999.990 S.. R5 2002 01 31 15 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 85003 MLO 2002 01 23 20 06 00 1844-91 S co CCGG 95.640 -999.990 S.. R5 2002 01 31 16 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 85004 MLO 2002 01 30 19 56 00 509-99 P co CCGG 91.350 -999.990 ... R5 2002 02 06 14 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 85005 MLO 2002 01 30 19 56 00 510-99 P co CCGG 91.590 -999.990 ... R5 2002 02 06 14 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 85006 MLO 2002 01 30 20 13 00 4337-91 S co CCGG 93.380 -999.990 S.. R5 2002 02 06 13 45 00 19.5300 -155.5800 3437.00 3397.00 40.00 85007 MLO 2002 01 30 20 13 00 4338-91 S co CCGG 92.350 -999.990 S.. R5 2002 02 06 13 58 00 19.5300 -155.5800 3437.00 3397.00 40.00 85008 MLO 2002 02 06 19 48 00 4741-91 P co CCGG 87.940 -999.990 ... R5 2002 02 14 15 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 85009 MLO 2002 02 06 19 48 00 4742-91 P co CCGG 86.960 -999.990 ... R5 2002 02 14 16 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 85010 MLO 2002 02 06 20 00 00 397-91 S co CCGG 83.370 -999.990 S.. R5 2002 02 14 16 18 00 19.5300 -155.5800 3437.00 3397.00 40.00 85011 MLO 2002 02 06 20 00 00 398-91 S co CCGG 83.930 -999.990 S.. R5 2002 02 14 16 31 00 19.5300 -155.5800 3437.00 3397.00 40.00 85012 MLO 2002 02 13 19 50 00 65-98 P co CCGG 102.650 -999.990 ... R5 2002 02 22 13 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 85013 MLO 2002 02 13 19 50 00 66-98 P co CCGG 100.990 -999.990 ... R5 2002 02 22 13 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 85014 MLO 2002 02 13 20 12 00 551-91 S co CCGG 95.780 -999.990 S.. R5 2002 02 22 13 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 85015 MLO 2002 02 13 20 12 00 552-91 S co CCGG 94.670 -999.990 S.. R5 2002 02 22 14 12 00 19.5300 -155.5800 3437.00 3397.00 40.00 85016 MLO 2002 02 20 20 01 00 393-91 P co CCGG 89.950 -999.990 ... R5 2002 03 01 11 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 85017 MLO 2002 02 20 20 01 00 394-91 P co CCGG 88.630 -999.990 ... R5 2002 03 01 11 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 85018 MLO 2002 02 20 20 13 00 4081-91 S co CCGG 92.540 -999.990 S.. R5 2002 03 01 11 58 00 19.5300 -155.5800 3437.00 3397.00 40.00 85019 MLO 2002 02 20 20 13 00 4082-91 S co CCGG 91.560 -999.990 S.. R5 2002 03 01 12 11 00 19.5300 -155.5800 3437.00 3397.00 40.00 85020 MLO 2002 03 01 19 53 00 1083-91 P co CCGG 108.620 -999.990 ... R5 2002 03 12 12 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 85021 MLO 2002 03 01 19 53 00 1084-91 P co CCGG 106.790 -999.990 ... R5 2002 03 12 12 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 85022 MLO 2002 03 01 20 08 00 4637-91 S co CCGG 101.400 -999.990 S.. R5 2002 03 12 12 16 00 19.5300 -155.5800 3437.00 3397.00 40.00 85023 MLO 2002 03 01 20 08 00 4638-91 S co CCGG 101.040 -999.990 S.. R5 2002 03 12 12 29 00 19.5300 -155.5800 3437.00 3397.00 40.00 85024 MLO 2002 03 06 20 08 00 1231-91 S co CCGG 90.670 -999.990 S.. R5 2002 03 18 10 38 00 19.5300 -155.5800 3437.00 3397.00 40.00 85025 MLO 2002 03 06 20 08 00 1232-91 S co CCGG 90.550 -999.990 S.. R5 2002 03 18 10 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 85026 MLO 2002 03 06 20 16 00 417-99 P co CCGG 94.260 -999.990 ... R5 2002 03 18 09 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 85027 MLO 2002 03 06 20 16 00 418-99 P co CCGG 91.600 -999.990 ... R5 2002 03 18 09 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 85028 MLO 2002 03 13 19 42 00 1491-91 P co CCGG 116.540 -999.990 ... R5 2002 03 27 11 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 85029 MLO 2002 03 13 19 42 00 1492-91 P co CCGG 116.280 -999.990 ... R5 2002 03 27 11 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 85030 MLO 2002 03 13 20 08 00 1215-91 S co CCGG 114.910 -999.990 S.. R5 2002 03 27 10 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 85031 MLO 2002 03 13 20 08 00 1216-91 S co CCGG 115.150 -999.990 S.. R5 2002 03 27 10 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 85032 MLO 2002 03 20 20 08 00 1913-91 P co CCGG 140.540 -999.990 ... R5 2002 03 29 11 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 85033 MLO 2002 03 20 20 08 00 1914-91 P co CCGG 138.240 -999.990 ... R5 2002 03 29 11 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 85034 MLO 2002 03 20 20 10 00 4615-91 S co CCGG 133.970 -999.990 S.. R5 2002 03 29 11 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 85035 MLO 2002 03 20 20 10 00 4616-91 S co CCGG 136.580 -999.990 S.. R5 2002 03 29 12 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 85036 MLO 2002 03 27 20 00 00 259-91 P co CCGG 114.600 -999.990 ... R5 2002 04 05 11 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 85037 MLO 2002 03 27 20 00 00 260-91 P co CCGG 113.400 -999.990 ... R5 2002 04 05 11 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 85038 MLO 2002 03 27 20 14 00 1771-91 S co CCGG 111.430 -999.990 S.. R5 2002 04 05 12 11 00 19.5300 -155.5800 3437.00 3397.00 40.00 85039 MLO 2002 03 27 20 14 00 1772-91 S co CCGG 110.770 -999.990 S.. R5 2002 04 05 12 24 00 19.5300 -155.5800 3437.00 3397.00 40.00 85040 MLO 2002 04 03 19 59 00 553-99 P co CCGG 83.450 -999.990 ... R5 2002 04 10 13 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 85041 MLO 2002 04 03 19 59 00 554-99 P co CCGG 82.740 -999.990 ... R5 2002 04 10 14 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 85042 MLO 2002 04 03 20 12 00 551-99 S co CCGG 80.340 -999.990 S.. R5 2002 04 10 13 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 85043 MLO 2002 04 03 20 12 00 552-99 S co CCGG 80.030 -999.990 S.. R5 2002 04 10 13 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 85044 MLO 2002 04 10 19 39 00 1941-91 P co CCGG 92.960 -999.990 P.. R5 2002 04 22 14 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 85045 MLO 2002 04 10 19 39 00 1942-91 P co CCGG 96.760 -999.990 P.. R5 2002 04 22 14 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 85046 MLO 2002 04 10 20 10 00 1659-91 S co CCGG 90.350 -999.990 S.. R5 2002 04 22 12 48 00 19.5300 -155.5800 3437.00 3397.00 40.00 85047 MLO 2002 04 10 20 10 00 1660-91 S co CCGG 91.560 -999.990 S.. R5 2002 04 22 13 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 85048 MLO 2002 04 17 19 53 00 545-99 P co CCGG 113.070 -999.990 ... R5 2002 05 07 16 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 85049 MLO 2002 04 17 19 53 00 546-99 P co CCGG 111.090 -999.990 ... R5 2002 05 07 16 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 85050 MLO 2002 04 17 20 11 00 171-98 S co CCGG 104.780 -999.990 S.. R5 2002 05 08 10 54 00 19.5300 -155.5800 3437.00 3397.00 40.00 85051 MLO 2002 04 17 20 11 00 172-98 S co CCGG 105.800 -999.990 S.. R5 2002 05 08 11 07 00 19.5300 -155.5800 3437.00 3397.00 40.00 85052 MLO 2002 04 24 19 44 00 6313-66 P co CCGG 120.640 -999.990 ... R5 2002 05 06 10 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 85053 MLO 2002 04 24 19 44 00 6314-66 P co CCGG 120.730 -999.990 ... R5 2002 05 06 10 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 85054 MLO 2002 04 24 20 09 00 6871-66 S co CCGG 122.530 -999.990 S.. R5 2002 05 06 09 58 00 19.5300 -155.5800 3437.00 3397.00 40.00 85055 MLO 2002 04 24 20 09 00 6872-66 S co CCGG 122.270 -999.990 S.. R5 2002 05 06 10 11 00 19.5300 -155.5800 3437.00 3397.00 40.00 85056 MLO 2002 05 01 19 56 00 849-91 P co CCGG 119.430 -999.990 ... R5 2002 05 09 13 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 85057 MLO 2002 05 01 19 56 00 850-91 P co CCGG 117.240 -999.990 ... R5 2002 05 09 14 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 85058 MLO 2002 05 01 20 12 00 6899-66 S co CCGG 114.810 -999.990 S.. R5 2002 05 09 16 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 85059 MLO 2002 05 01 20 12 00 6900-66 S co CCGG 113.450 -999.990 S.. R5 2002 05 09 16 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 85060 MLO 2002 05 08 19 56 00 4705-91 P co CCGG 81.980 -999.990 ... R5 2002 05 24 14 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 85061 MLO 2002 05 08 19 56 00 4706-91 P co CCGG 81.280 -999.990 ... R5 2002 05 24 14 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 85062 MLO 2002 05 08 20 09 00 6159-66 S co CCGG 78.640 -999.990 S.. R5 2002 05 24 14 50 00 19.5300 -155.5800 3437.00 3397.00 40.00 85063 MLO 2002 05 08 20 09 00 6160-66 S co CCGG 79.260 -999.990 S.. R5 2002 05 24 15 03 00 19.5300 -155.5800 3437.00 3397.00 40.00 85064 MLO 2002 05 15 19 54 00 6393-66 P co CCGG 88.110 -999.990 ... R5 2002 05 28 16 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 85065 MLO 2002 05 15 19 54 00 6394-66 P co CCGG 85.520 -999.990 ... R5 2002 05 28 16 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 85066 MLO 2002 05 15 20 12 00 6383-66 S co CCGG 84.890 -999.990 S.. R5 2002 05 28 15 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 85067 MLO 2002 05 15 20 12 00 6384-66 S co CCGG 85.820 -999.990 S.. R5 2002 05 28 15 21 00 19.5300 -155.5800 3437.00 3397.00 40.00 85068 MLO 2002 05 22 19 53 00 45-91 P co CCGG 72.030 -999.990 Z.. R5 2002 06 25 12 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 85069 MLO 2002 05 22 19 53 00 45-91 P co CCGG 106.050 -999.990 Z.. R5 2002 06 25 17 24 00 19.5300 -155.5800 3402.00 3397.00 5.00 85069 MLO 2002 05 22 19 53 00 46-91 P co CCGG 103.560 -999.990 ... R5 2002 06 25 12 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 85070 MLO 2002 05 22 20 10 00 663-91 S co CCGG 95.390 -999.990 S.. R5 2002 06 25 14 17 00 19.5300 -155.5800 3437.00 3397.00 40.00 85071 MLO 2002 05 22 20 10 00 664-91 S co CCGG 95.420 -999.990 S.. R5 2002 06 25 14 30 00 19.5300 -155.5800 3437.00 3397.00 40.00 85072 MLO 2002 05 29 19 51 00 1007-91 P co CCGG 100.370 -999.990 P.. R5 2002 06 12 09 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 85073 MLO 2002 05 29 19 51 00 1008-91 P co CCGG 97.450 -999.990 P.. R5 2002 06 12 09 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 85074 MLO 2002 05 29 20 09 00 4259-91 S co CCGG 88.220 -999.990 S.. R5 2002 06 12 10 24 00 19.5300 -155.5800 3437.00 3397.00 40.00 85075 MLO 2002 05 29 20 09 00 4260-91 S co CCGG 89.260 -999.990 S.. R5 2002 06 12 10 37 00 19.5300 -155.5800 3437.00 3397.00 40.00 85076 MLO 2002 06 05 19 50 00 755-91 P co CCGG 115.490 -999.990 ... R5 2002 07 17 11 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 85077 MLO 2002 06 05 19 50 00 756-91 P co CCGG 114.060 -999.990 ... R5 2002 07 17 11 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 85078 MLO 2002 06 05 20 01 00 1615-91 S co CCGG 99.530 -999.990 S.. R5 2002 07 17 11 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 85079 MLO 2002 06 05 20 01 00 1616-91 S co CCGG 96.370 -999.990 S.. R5 2002 07 17 11 42 00 19.5300 -155.5800 3437.00 3397.00 40.00 85080 MLO 2002 06 12 19 57 00 453-99 P co CCGG 95.190 -999.990 ... R5 2002 06 25 16 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 85081 MLO 2002 06 12 19 57 00 454-99 P co CCGG 93.640 -999.990 ... R5 2002 06 25 16 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 85082 MLO 2002 06 12 20 34 00 403-99 S co CCGG 89.410 -999.990 S.. R5 2002 06 26 11 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 85083 MLO 2002 06 12 20 34 00 404-99 S co CCGG 89.750 -999.990 S.. R5 2002 06 26 11 15 00 19.5300 -155.5800 3437.00 3397.00 40.00 85084 MLO 2002 06 19 19 57 00 53-91 P co CCGG 84.270 -999.990 ... R5 2002 07 02 14 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 85085 MLO 2002 06 19 19 57 00 54-91 P co CCGG 83.240 -999.990 ... R5 2002 07 02 14 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 85086 MLO 2002 06 19 20 10 00 7-91 S co CCGG 79.980 -999.990 S.. R5 2002 07 02 13 32 00 19.5300 -155.5800 3437.00 3397.00 40.00 85087 MLO 2002 06 19 20 10 00 8-91 S co CCGG 79.630 -999.990 S.. R5 2002 07 02 13 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 85088 MLO 2002 06 26 19 47 00 4033-91 P co CCGG 84.990 -999.990 P.. R5 2002 07 05 09 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 85089 MLO 2002 06 26 19 47 00 4034-91 P co CCGG 81.020 -999.990 P.. R5 2002 07 05 09 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 85090 MLO 2002 06 26 20 08 00 439-91 S co CCGG 75.430 -999.990 S.. R5 2002 07 05 09 45 00 19.5300 -155.5800 3437.00 3397.00 40.00 85091 MLO 2002 06 26 20 08 00 440-91 S co CCGG 76.580 -999.990 S.. R5 2002 07 05 09 58 00 19.5300 -155.5800 3437.00 3397.00 40.00 85092 MLO 2002 07 05 19 49 00 519-99 P co CCGG 95.000 -999.990 ... R5 2002 07 12 12 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 85093 MLO 2002 07 05 19 49 00 520-99 P co CCGG 92.240 -999.990 ... R5 2002 07 12 12 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 85094 MLO 2002 07 05 20 19 00 639-91 S co CCGG 87.010 -999.990 S.. R5 2002 07 12 11 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 85095 MLO 2002 07 05 20 19 00 640-91 S co CCGG 85.960 -999.990 S.. R5 2002 07 12 11 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 85096 MLO 2002 07 10 19 54 00 479-99 P co CCGG 73.760 -999.990 ... R5 2002 07 16 15 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 85097 MLO 2002 07 10 19 54 00 480-99 P co CCGG 71.950 -999.990 ... R5 2002 07 16 16 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 85098 MLO 2002 07 10 20 11 00 4459-91 S co CCGG 70.940 -999.990 S.. R5 2002 07 16 11 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 85099 MLO 2002 07 10 20 11 00 4460-91 S co CCGG 69.070 -999.990 S.. R5 2002 07 16 12 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 85100 MLO 2002 07 17 19 52 00 393-91 P co CCGG 72.610 -999.990 ... R5 2002 07 22 13 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 85101 MLO 2002 07 17 19 52 00 394-91 P co CCGG 70.790 -999.990 ... R5 2002 07 22 13 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 85102 MLO 2002 07 17 20 07 00 1435-91 S co CCGG 67.520 -999.990 S.. R5 2002 07 22 13 16 00 19.5300 -155.5800 3437.00 3397.00 40.00 85103 MLO 2002 07 17 20 07 00 1436-91 S co CCGG 67.690 -999.990 S.. R5 2002 07 22 13 29 00 19.5300 -155.5800 3437.00 3397.00 40.00 85104 MLO 2002 07 24 20 09 00 565-99 P co CCGG 74.460 -999.990 ... R5 2002 07 30 15 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 85105 MLO 2002 07 24 20 09 00 566-99 P co CCGG 72.410 -999.990 ... R5 2002 07 30 15 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 85106 MLO 2002 07 24 20 12 00 707-99 S co CCGG 71.480 -999.990 S.. R5 2002 07 30 14 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 85107 MLO 2002 07 24 20 12 00 708-99 S co CCGG 68.130 -999.990 S.. R5 2002 07 30 14 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 85108 MLO 2002 07 31 19 47 00 763-91 P co CCGG 63.480 -999.990 ... R5 2002 08 07 11 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 85109 MLO 2002 07 31 19 47 00 764-91 P co CCGG 63.330 -999.990 ... R5 2002 08 07 12 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 85110 MLO 2002 07 31 20 11 00 1149-91 S co CCGG 68.260 -999.990 S.. R5 2002 08 06 16 38 00 19.5300 -155.5800 3437.00 3397.00 40.00 85111 MLO 2002 07 31 20 11 00 1150-91 S co CCGG 66.230 -999.990 S.. R5 2002 08 06 16 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 85112 MLO 2002 08 07 19 48 00 1571-91 P co CCGG 80.820 -999.990 ... R5 2002 08 14 14 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 85113 MLO 2002 08 07 19 48 00 1572-91 P co CCGG 78.660 -999.990 ... R5 2002 08 14 14 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 85114 MLO 2002 08 07 20 08 00 1361-91 S co CCGG 75.330 -999.990 S.. R5 2002 08 14 13 10 00 19.5300 -155.5800 3437.00 3397.00 40.00 85115 MLO 2002 08 07 20 08 00 1362-91 S co CCGG 75.630 -999.990 S.. R5 2002 08 14 13 23 00 19.5300 -155.5800 3437.00 3397.00 40.00 85116 MLO 2002 08 14 19 48 00 1757-91 P co CCGG 69.560 -999.990 ... R5 2002 08 22 15 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 85117 MLO 2002 08 14 19 48 00 1758-91 P co CCGG 68.740 -999.990 ... R5 2002 08 22 15 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 85118 MLO 2002 08 14 20 00 00 1479-91 S co CCGG 68.300 -999.990 S.. R5 2002 08 22 12 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 85119 MLO 2002 08 14 20 00 00 1480-91 S co CCGG 67.650 -999.990 S.. R5 2002 08 22 12 27 00 19.5300 -155.5800 3437.00 3397.00 40.00 85120 MLO 2002 08 21 19 56 00 1203-91 P co CCGG 65.910 -999.990 ... R5 2002 09 03 14 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 85121 MLO 2002 08 21 19 56 00 1204-91 P co CCGG 64.560 -999.990 ... R5 2002 09 03 14 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 85122 MLO 2002 08 21 20 11 00 381-91 S co CCGG 61.420 -999.990 S.. R5 2002 09 03 13 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 85123 MLO 2002 08 21 20 11 00 382-91 S co CCGG 61.090 -999.990 S.. R5 2002 09 03 14 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 85124 MLO 2002 08 28 19 52 00 1317-91 P co CCGG 80.270 -999.990 ... R5 2002 09 04 10 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 85125 MLO 2002 08 28 19 52 00 1318-91 P co CCGG 78.160 -999.990 ... R5 2002 09 04 10 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 85126 MLO 2002 08 28 20 09 00 1971-91 S co CCGG 73.120 -999.990 S.. R5 2002 09 04 12 57 00 19.5300 -155.5800 3437.00 3397.00 40.00 85127 MLO 2002 08 28 20 09 00 1972-91 S co CCGG 73.170 -999.990 S.. R5 2002 09 04 13 10 00 19.5300 -155.5800 3437.00 3397.00 40.00 85128 MLO 2002 09 04 19 47 00 621-91 P co CCGG 92.290 -999.990 ... R5 2002 09 18 12 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 85129 MLO 2002 09 04 19 47 00 622-91 P co CCGG 90.250 -999.990 ... R5 2002 09 18 13 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 85130 MLO 2002 09 04 20 00 00 2003-91 S co CCGG 85.690 -999.990 S.. R5 2002 09 18 11 30 00 19.5300 -155.5800 3437.00 3397.00 40.00 85131 MLO 2002 09 04 20 00 00 2004-91 S co CCGG 87.120 -999.990 S.. R5 2002 09 18 11 43 00 19.5300 -155.5800 3437.00 3397.00 40.00 85132 MLO 2002 09 18 19 46 00 123-99 P co CCGG 92.190 -999.990 P.. R5 2002 09 26 11 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 85133 MLO 2002 09 18 19 46 00 124-99 P co CCGG 88.340 -999.990 P.. R5 2002 09 26 11 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 85134 MLO 2002 09 18 20 00 00 1757-91 S co CCGG 86.310 -999.990 S.. R5 2002 09 25 16 52 00 19.5300 -155.5800 3437.00 3397.00 40.00 85135 MLO 2002 09 18 20 00 00 1758-91 S co CCGG 86.010 -999.990 S.. R5 2002 09 25 17 05 00 19.5300 -155.5800 3437.00 3397.00 40.00 85136 MLO 2002 09 25 19 54 00 191-91 P co CCGG 92.930 -999.990 ... R5 2002 10 01 11 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 85137 MLO 2002 09 25 19 54 00 192-91 P co CCGG 92.620 -999.990 ... R5 2002 10 01 11 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 85138 MLO 2002 09 25 20 10 00 4613-91 S co CCGG 86.390 -999.990 S.. R5 2002 10 01 10 50 00 19.5300 -155.5800 3437.00 3397.00 40.00 85139 MLO 2002 09 25 20 10 00 4614-91 S co CCGG 84.890 -999.990 S.. R5 2002 10 01 11 03 00 19.5300 -155.5800 3437.00 3397.00 40.00 85140 MLO 2002 10 02 19 50 00 1317-91 P co CCGG 98.400 -999.990 ... R5 2002 10 07 15 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 85141 MLO 2002 10 02 19 50 00 1318-91 P co CCGG 97.560 -999.990 ... R5 2002 10 07 15 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 85142 MLO 2002 10 02 20 00 00 633-91 S co CCGG 80.330 -999.990 S.. R5 2002 10 07 14 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 85143 MLO 2002 10 02 20 00 00 634-91 S co CCGG 79.540 -999.990 S.. R5 2002 10 07 15 05 00 19.5300 -155.5800 3437.00 3397.00 40.00 85144 MLO 2002 10 09 19 52 00 527-99 P co CCGG 102.060 -999.990 ... R5 2002 10 17 15 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 85145 MLO 2002 10 09 19 52 00 528-99 P co CCGG 99.270 -999.990 ... R5 2002 10 17 15 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 85146 MLO 2002 10 09 20 00 00 451-91 S co CCGG 96.680 -999.990 S.. R5 2002 10 17 15 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 85147 MLO 2002 10 09 20 00 00 452-91 S co CCGG 95.720 -999.990 S.. R5 2002 10 17 15 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 85148 MLO 2002 10 16 19 55 00 787-99 P co CCGG 77.490 -999.990 ... R5 2002 10 28 10 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 85149 MLO 2002 10 16 19 55 00 788-99 P co CCGG 75.130 -999.990 ... R5 2002 10 28 10 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 85150 MLO 2002 10 16 20 09 00 4135-91 S co CCGG 76.820 -999.990 S.. R5 2002 10 28 10 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 85151 MLO 2002 10 16 20 09 00 4136-91 S co CCGG 77.830 -999.990 S.. R5 2002 10 28 10 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 85152 MLO 2002 10 23 19 49 00 4575-91 P co CCGG 104.440 -999.990 ... R5 2002 10 31 13 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 85153 MLO 2002 10 23 19 49 00 4576-91 P co CCGG 102.730 -999.990 ... R5 2002 10 31 14 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 85154 MLO 2002 10 30 19 46 00 541-99 P co CCGG 129.030 -999.990 ... R5 2002 11 05 15 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 85155 MLO 2002 10 30 19 46 00 542-99 P co CCGG 129.030 -999.990 ... R5 2002 11 05 15 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 85156 MLO 2002 10 30 20 09 00 189-91 S co CCGG 122.820 -999.990 S.. R5 2002 11 05 16 12 00 19.5300 -155.5800 3437.00 3397.00 40.00 85157 MLO 2002 10 30 20 09 00 190-91 S co CCGG 123.740 -999.990 S.. R5 2002 11 05 16 25 00 19.5300 -155.5800 3437.00 3397.00 40.00 85158 MLO 2002 11 06 19 40 00 547-99 P co CCGG 106.970 -999.990 ... R5 2002 11 14 15 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 85159 MLO 2002 11 06 19 40 00 548-99 P co CCGG 106.230 -999.990 ... R5 2002 11 14 16 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 85160 MLO 2002 11 06 20 09 00 309-99 S co CCGG 101.610 -999.990 S.. R5 2002 11 14 14 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 85161 MLO 2002 11 06 20 09 00 310-99 S co CCGG 102.390 -999.990 S.. R5 2002 11 14 14 52 00 19.5300 -155.5800 3437.00 3397.00 40.00 85162 MLO 2002 11 13 19 56 00 295-99 P co CCGG 89.780 -999.990 ... R5 2002 11 20 15 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 85163 MLO 2002 11 13 19 56 00 296-99 P co CCGG 86.990 -999.990 ... R5 2002 11 20 15 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 85164 MLO 2002 11 13 20 11 00 1131-91 S co CCGG 85.760 -999.990 S.. R5 2002 11 20 13 18 00 19.5300 -155.5800 3437.00 3397.00 40.00 85165 MLO 2002 11 13 20 11 00 1132-91 S co CCGG 84.280 -999.990 S.. R5 2002 11 20 13 31 00 19.5300 -155.5800 3437.00 3397.00 40.00 85166 MLO 2002 11 20 19 48 00 285-99 P co CCGG 124.350 -999.990 ... R5 2002 11 26 13 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 85167 MLO 2002 11 20 19 48 00 286-99 P co CCGG 122.610 -999.990 ... R5 2002 11 26 13 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 85168 MLO 2002 11 20 20 08 00 4095-91 S co CCGG 120.120 -999.990 S.. R5 2002 11 26 15 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 85169 MLO 2002 11 20 20 08 00 4096-91 S co CCGG 124.150 -999.990 S.. R5 2002 11 26 15 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 85170 MLO 2002 11 27 19 56 00 1205-91 P co CCGG 110.170 -999.990 ... R5 2002 12 05 11 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 85171 MLO 2002 11 27 19 56 00 1206-91 P co CCGG 108.150 -999.990 ... R5 2002 12 05 11 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 85172 MLO 2002 11 27 20 01 00 4203-91 S co CCGG 106.740 -999.990 S.. R5 2002 12 05 13 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 85173 MLO 2002 11 27 20 01 00 4204-91 S co CCGG 105.660 -999.990 S.. R5 2002 12 05 13 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 85174 MLO 2002 12 04 20 14 00 4797-91 S co CCGG 105.720 -999.990 S.. R5 2002 12 11 13 22 00 19.5300 -155.5800 3437.00 3397.00 40.00 85175 MLO 2002 12 04 20 14 00 4798-91 S co CCGG 105.760 -999.990 S.. R5 2002 12 11 13 35 00 19.5300 -155.5800 3437.00 3397.00 40.00 85176 MLO 2002 12 04 20 50 00 233-99 P co CCGG 111.070 -999.990 P.. R5 2002 12 11 14 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 85177 MLO 2002 12 04 20 50 00 234-99 P co CCGG 108.130 -999.990 P.. R5 2002 12 11 14 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 85178 MLO 2002 12 11 19 57 00 411-99 P co CCGG 120.680 -999.990 ... R5 2002 12 17 17 03 00 19.5300 -155.5800 3402.00 3397.00 5.00 85179 MLO 2002 12 11 19 57 00 412-99 P co CCGG 118.420 -999.990 ... R5 2002 12 17 17 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 85180 MLO 2002 12 11 20 15 00 897-91 S co CCGG 115.660 -999.990 S.. R5 2002 12 17 15 45 00 19.5300 -155.5800 3437.00 3397.00 40.00 85181 MLO 2002 12 11 20 15 00 898-91 S co CCGG 116.220 -999.990 S.. R5 2002 12 17 15 58 00 19.5300 -155.5800 3437.00 3397.00 40.00 85182 MLO 2002 12 18 19 46 00 803-99 P co CCGG 107.420 -999.990 ... R5 2003 01 07 10 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 85183 MLO 2002 12 18 19 46 00 804-99 P co CCGG 107.540 -999.990 ... R5 2003 01 07 11 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 85184 MLO 2002 12 18 20 08 00 809-99 S co CCGG 99.990 -999.990 S.. R5 2003 01 06 15 56 00 19.5300 -155.5800 3437.00 3397.00 40.00 85185 MLO 2002 12 18 20 08 00 810-99 S co CCGG 100.840 -999.990 S.. R5 2003 01 06 16 09 00 19.5300 -155.5800 3437.00 3397.00 40.00 85186 MLO 2002 12 26 12 34 56 837-99 S co CCGG 94.940 -999.990 S.. R5 2003 01 08 13 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 85189 MLO 2002 12 26 12 34 56 838-99 S co CCGG 93.550 -999.990 S.. R5 2003 01 08 13 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 85190 MLO 2002 12 26 19 50 00 835-99 P co CCGG 98.940 -999.990 ... R5 2003 01 08 13 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 85187 MLO 2002 12 26 19 50 00 836-99 P co CCGG 98.730 -999.990 ... R5 2003 01 08 13 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 85188 MLO 2003 01 08 19 54 00 101-99 P co CCGG 102.690 -999.990 ... R5 2003 01 15 14 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 85191 MLO 2003 01 08 19 54 00 102-99 P co CCGG 103.680 -999.990 ... R5 2003 01 15 15 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 85192 MLO 2003 01 08 20 12 00 551-91 S co CCGG 99.470 -999.990 S.. R5 2003 01 15 14 21 00 19.5300 -155.5800 3437.00 3397.00 40.00 85193 MLO 2003 01 08 20 12 00 552-91 S co CCGG 98.280 -999.990 S.. R5 2003 01 15 14 34 00 19.5300 -155.5800 3437.00 3397.00 40.00 85194 MLO 2003 01 15 19 53 00 91-99 P co CCGG 103.230 -999.990 ... R5 2003 01 27 13 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 85195 MLO 2003 01 15 19 53 00 92-99 P co CCGG 100.830 -999.990 ... R5 2003 01 27 13 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 85196 MLO 2003 01 15 20 15 00 4209-91 S co CCGG 98.030 -999.990 S.. R5 2003 01 27 12 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 85197 MLO 2003 01 15 20 15 00 4210-91 S co CCGG 97.310 -999.990 S.. R5 2003 01 27 12 27 00 19.5300 -155.5800 3437.00 3397.00 40.00 85198 MLO 2003 01 22 19 55 00 895-99 P co CCGG 132.050 -999.990 ... R5 2003 01 31 16 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 85199 MLO 2003 01 22 19 55 00 896-99 P co CCGG 130.900 -999.990 ... R5 2003 01 31 16 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 85200 MLO 2003 01 22 20 13 00 897-99 S co CCGG 128.190 -999.990 S.. R5 2003 01 31 16 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 85201 MLO 2003 01 22 20 13 00 898-99 S co CCGG 126.960 -999.990 S.. R5 2003 01 31 16 17 00 19.5300 -155.5800 3437.00 3397.00 40.00 85202 MLO 2003 01 29 19 56 00 113-99 P co CCGG 108.640 -999.990 ... R5 2003 02 05 15 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 85203 MLO 2003 01 29 19 56 00 114-99 P co CCGG 107.550 -999.990 ... R5 2003 02 05 15 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 85204 MLO 2003 01 29 20 05 00 35-91 S co CCGG 106.450 -999.990 S.. R5 2003 02 05 15 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 85205 MLO 2003 01 29 20 05 00 36-91 S co CCGG 106.360 -999.990 S.. R5 2003 02 05 16 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 85206 MLO 2003 02 05 19 55 00 13-99 P co CCGG 101.790 -999.990 ... R5 2003 02 10 15 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 85207 MLO 2003 02 05 19 55 00 14-99 P co CCGG 101.810 -999.990 ... R5 2003 02 10 16 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 85208 MLO 2003 02 05 20 15 00 2103-66 S co CCGG 100.190 -999.990 S.. R5 2003 02 12 12 31 00 19.5300 -155.5800 3437.00 3397.00 40.00 85209 MLO 2003 02 05 20 15 00 2104-66 S co CCGG 99.770 -999.990 S.. R5 2003 02 12 12 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 85210 MLO 2003 02 12 20 00 00 4753-91 P co CCGG 107.090 -999.990 P.. R5 2003 02 25 12 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 85211 MLO 2003 02 12 20 00 00 4754-91 P co CCGG 102.720 -999.990 P.. R5 2003 02 25 12 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 85212 MLO 2003 02 12 20 04 00 451-91 S co CCGG 97.960 -999.990 S.. R5 2003 02 25 12 56 00 19.5300 -155.5800 3437.00 3397.00 40.00 85213 MLO 2003 02 12 20 04 00 452-91 S co CCGG 96.620 -999.990 S.. R5 2003 02 25 13 10 00 19.5300 -155.5800 3437.00 3397.00 40.00 85214 MLO 2003 02 19 19 49 00 1029-99 P co CCGG 150.830 -999.990 ... R5 2003 02 27 14 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 85215 MLO 2003 02 19 19 49 00 1030-99 P co CCGG 149.370 -999.990 ... R5 2003 02 27 15 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 85216 MLO 2003 02 19 20 09 00 1021-91 S co CCGG 146.680 -999.990 S.. R5 2003 02 27 14 25 00 19.5300 -155.5800 3437.00 3397.00 40.00 85217 MLO 2003 02 19 20 09 00 1022-91 S co CCGG 146.210 -999.990 S.. R5 2003 02 27 14 38 00 19.5300 -155.5800 3437.00 3397.00 40.00 85218 MLO 2003 02 26 19 58 00 311-91 P co CCGG 118.030 -999.990 ... R5 2003 03 07 14 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 85219 MLO 2003 02 26 19 58 00 312-91 P co CCGG 117.510 -999.990 ... R5 2003 03 07 14 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 85220 MLO 2003 02 26 20 02 00 67-91 S co CCGG 111.500 -999.990 S.. R5 2003 03 07 14 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 85221 MLO 2003 02 26 20 02 00 68-91 S co CCGG 112.280 -999.990 S.. R5 2003 03 07 14 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 85222 MLO 2003 03 05 19 50 00 1963-91 P co CCGG 132.820 -999.990 ... R5 2003 03 17 15 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 85223 MLO 2003 03 05 19 50 00 1964-91 P co CCGG 130.890 -999.990 ... R5 2003 03 17 15 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 85224 MLO 2003 03 05 20 00 00 1001-91 S co CCGG 122.400 -999.990 S.. R5 2003 03 17 16 57 00 19.5300 -155.5800 3437.00 3397.00 40.00 85225 MLO 2003 03 05 20 00 00 1002-91 S co CCGG 122.290 -999.990 S.. R5 2003 03 17 17 10 00 19.5300 -155.5800 3437.00 3397.00 40.00 85226 MLO 2003 03 12 21 25 00 569-99 P co CCGG 138.970 -999.990 ... R5 2003 03 25 14 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 85227 MLO 2003 03 12 21 25 00 570-99 P co CCGG 137.190 -999.990 ... R5 2003 03 25 14 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 85228 MLO 2003 03 12 21 44 00 451-99 S co CCGG 132.350 -999.990 S.. R5 2003 03 25 13 12 00 19.5300 -155.5800 3437.00 3397.00 40.00 85229 MLO 2003 03 12 21 44 00 452-99 S co CCGG 132.120 -999.990 S.. R5 2003 03 25 13 25 00 19.5300 -155.5800 3437.00 3397.00 40.00 85230 MLO 2003 03 19 19 53 00 1089-99 P co CCGG 121.310 -999.990 ... R5 2003 03 24 15 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 85231 MLO 2003 03 19 19 53 00 1090-99 P co CCGG 119.980 -999.990 ... R5 2003 03 24 15 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 85232 MLO 2003 03 19 20 10 00 97-98 S co CCGG 117.100 -999.990 S.. R5 2003 03 24 14 52 00 19.5300 -155.5800 3437.00 3397.00 40.00 85233 MLO 2003 03 19 20 10 00 98-98 S co CCGG 119.210 -999.990 S.. R5 2003 03 24 15 05 00 19.5300 -155.5800 3437.00 3397.00 40.00 85234 MLO 2003 03 26 19 41 00 553-99 P co CCGG 137.660 -999.990 P.. R5 2003 04 03 13 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 85235 MLO 2003 03 26 19 41 00 554-99 P co CCGG 134.390 -999.990 P.. R5 2003 04 03 13 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 85236 MLO 2003 03 26 20 10 00 4559-91 S co CCGG 126.440 -999.990 S.. R5 2003 04 03 11 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 85237 MLO 2003 03 26 20 10 00 4560-91 S co CCGG 127.540 -999.990 S.. R5 2003 04 03 12 12 00 19.5300 -155.5800 3437.00 3397.00 40.00 85238 MLO 2003 04 02 19 44 00 1231-99 P co CCGG 133.010 -999.990 ... R5 2003 04 08 11 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 85239 MLO 2003 04 02 19 44 00 1232-99 P co CCGG 130.570 -999.990 ... R5 2003 04 08 11 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 85240 MLO 2003 04 02 20 14 00 1229-99 S co CCGG 126.820 -999.990 S.. R5 2003 04 08 12 31 00 19.5300 -155.5800 3437.00 3397.00 40.00 85241 MLO 2003 04 02 20 14 00 1230-99 S co CCGG 126.210 -999.990 S.. R5 2003 04 08 12 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 85242 MLO 2003 04 09 19 43 00 4429-91 P co CCGG 114.280 -999.990 ... R5 2003 04 16 13 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 85243 MLO 2003 04 09 19 43 00 4430-91 P co CCGG 111.880 -999.990 ... R5 2003 04 16 13 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 85244 MLO 2003 04 09 20 12 00 6481-66 S co CCGG 118.660 -999.990 S.. R5 2003 04 16 16 24 00 19.5300 -155.5800 3437.00 3397.00 40.00 85245 MLO 2003 04 09 20 12 00 6482-66 S co CCGG 118.330 -999.990 S.. R5 2003 04 16 16 37 00 19.5300 -155.5800 3437.00 3397.00 40.00 85246 MLO 2003 04 16 19 52 00 1105-91 P co CCGG 140.800 -999.990 ... R5 2003 04 24 12 30 00 19.5300 -155.5800 3402.00 3397.00 5.00 85247 MLO 2003 04 16 19 52 00 1106-91 P co CCGG 138.540 -999.990 ... R5 2003 04 24 12 43 00 19.5300 -155.5800 3402.00 3397.00 5.00 85248 MLO 2003 04 16 20 11 00 1743-91 S co CCGG 133.630 -999.990 S.. R5 2003 04 24 12 56 00 19.5300 -155.5800 3437.00 3397.00 40.00 85249 MLO 2003 04 16 20 11 00 1744-91 S co CCGG 134.170 -999.990 S.. R5 2003 04 24 13 10 00 19.5300 -155.5800 3437.00 3397.00 40.00 85250 MLO 2003 04 23 19 52 00 601-99 P co CCGG 131.110 -999.990 ... R5 2003 05 08 10 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 85251 MLO 2003 04 23 19 52 00 602-99 P co CCGG 130.680 -999.990 ... R5 2003 05 08 10 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 85252 MLO 2003 04 23 20 00 00 125-99 S co CCGG 126.550 -999.990 S.. R5 2003 05 08 09 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 85253 MLO 2003 04 23 20 00 00 126-99 S co CCGG 129.000 -999.990 S.. R5 2003 05 08 10 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 85254 MLO 2003 04 29 19 56 00 809-99 P co CCGG 126.850 -999.990 ... R5 2003 05 19 11 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 85255 MLO 2003 04 29 19 56 00 810-99 P co CCGG 124.580 -999.990 ... R5 2003 05 19 12 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 85256 MLO 2003 04 29 20 20 00 559-99 S co CCGG 122.470 -999.990 S.. R5 2003 05 19 13 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 85257 MLO 2003 04 29 20 20 00 560-99 S co CCGG 121.820 -999.990 S.. R5 2003 05 19 13 21 00 19.5300 -155.5800 3437.00 3397.00 40.00 85258 MLO 2003 05 07 19 58 00 189-99 P co CCGG 124.740 -999.990 ... R5 2003 05 27 14 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 85259 MLO 2003 05 07 19 58 00 190-99 P co CCGG 123.110 -999.990 ... R5 2003 05 27 14 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 85260 MLO 2003 05 07 20 16 00 4129-91 S co CCGG 118.360 -999.990 S.. R5 2003 05 27 15 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 85261 MLO 2003 05 07 20 16 00 4130-91 S co CCGG 119.130 -999.990 S.. R5 2003 05 27 15 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 85262 MLO 2003 05 14 19 52 00 1333-99 P co CCGG 94.590 -999.990 ... R5 2003 05 27 12 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 85263 MLO 2003 05 14 19 52 00 1334-99 P co CCGG 92.630 -999.990 ... R5 2003 05 27 12 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 85264 MLO 2003 05 14 20 16 00 1307-99 S co CCGG 93.040 -999.990 S.. R5 2003 05 27 13 11 00 19.5300 -155.5800 3437.00 3397.00 40.00 85265 MLO 2003 05 14 20 16 00 1308-99 S co CCGG 88.020 -999.990 S.. R5 2003 05 27 13 24 00 19.5300 -155.5800 3437.00 3397.00 40.00 85266 MLO 2003 05 21 19 51 00 1113-99 P co CCGG 124.950 -999.990 P.. R5 2003 06 05 13 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 85267 MLO 2003 05 21 19 51 00 1114-99 P co CCGG 120.430 -999.990 P.. R5 2003 06 05 13 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 85268 MLO 2003 05 21 20 15 00 479-99 S co CCGG 121.380 -999.990 S.. R5 2003 06 05 12 50 00 19.5300 -155.5800 3437.00 3397.00 40.00 85269 MLO 2003 05 21 20 15 00 480-99 S co CCGG 121.620 -999.990 S.. R5 2003 06 05 13 03 00 19.5300 -155.5800 3437.00 3397.00 40.00 85270 MLO 2003 05 28 19 57 00 1217-91 P co CCGG 113.900 -999.990 ... R5 2003 06 05 16 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 85271 MLO 2003 05 28 19 57 00 1218-91 P co CCGG 114.610 -999.990 ... R5 2003 06 05 16 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 85272 MLO 2003 05 28 20 19 00 4835-98 S co CCGG 111.840 -999.990 S.. R5 2003 06 05 09 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 85273 MLO 2003 05 28 20 19 00 4836-98 S co CCGG 111.080 -999.990 S.. R5 2003 06 05 09 57 00 19.5300 -155.5800 3437.00 3397.00 40.00 85274 MLO 2003 05 30 19 37 00 1207-91 P co CCGG 113.360 -999.990 P.. R5 2003 06 20 16 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 85275 MLO 2003 05 30 19 37 00 1208-91 P co CCGG 110.280 -999.990 P.. R5 2003 06 20 16 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 85276 MLO 2003 06 04 19 58 00 553-99 P co CCGG 98.770 -999.990 ... R5 2003 06 19 14 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 85277 MLO 2003 06 04 19 58 00 554-99 P co CCGG 96.390 -999.990 ... R5 2003 06 19 15 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 85278 MLO 2003 06 04 20 05 00 4241-91 S co CCGG 92.610 -999.990 S.. R5 2003 06 19 14 30 00 19.5300 -155.5800 3437.00 3397.00 40.00 85279 MLO 2003 06 04 20 05 00 4242-91 S co CCGG 91.290 -999.990 S.. R5 2003 06 19 14 43 00 19.5300 -155.5800 3437.00 3397.00 40.00 85280 MLO 2003 06 06 19 57 00 699-91 P co CCGG 133.050 -999.990 P.. R5 2003 06 20 15 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 85281 MLO 2003 06 06 19 57 00 700-91 P co CCGG 129.590 -999.990 P.. R5 2003 06 20 15 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 85282 MLO 2003 06 11 19 45 00 635-91 P co CCGG 111.240 -999.990 ... R5 2003 06 23 10 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 85283 MLO 2003 06 11 19 45 00 636-91 P co CCGG 111.170 -999.990 ... R5 2003 06 23 10 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 85284 MLO 2003 06 11 20 00 00 57-91 S co CCGG 107.270 -999.990 S.. R5 2003 06 23 10 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 85285 MLO 2003 06 11 20 00 00 58-91 S co CCGG 107.600 -999.990 S.. R5 2003 06 23 10 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 85286 MLO 2003 06 13 19 52 00 399-99 P co CCGG 115.170 -999.990 ... R5 2003 07 03 10 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 85287 MLO 2003 06 13 19 52 00 400-99 P co CCGG 112.980 -999.990 ... R5 2003 07 03 11 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 85288 MLO 2003 06 17 20 06 00 1501-99 P co CCGG 85.770 -999.990 ... R5 2003 06 27 11 02 00 19.5300 -155.5800 3402.00 3397.00 5.00 85289 MLO 2003 06 17 20 06 00 1502-99 P co CCGG 83.450 -999.990 ... R5 2003 06 27 11 15 00 19.5300 -155.5800 3402.00 3397.00 5.00 85290 MLO 2003 06 17 20 16 00 1499-99 S co CCGG 79.590 -999.990 S.. R5 2003 06 27 11 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 85291 MLO 2003 06 17 20 16 00 1500-99 S co CCGG 80.620 -999.990 S.. R5 2003 06 27 11 41 00 19.5300 -155.5800 3437.00 3397.00 40.00 85292 MLO 2003 06 20 20 17 00 377-99 P co CCGG 90.500 -999.990 P.. R5 2003 07 03 12 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 85293 MLO 2003 06 20 20 17 00 378-99 P co CCGG 87.510 -999.990 P.. R5 2003 07 03 12 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 85294 MLO 2003 06 25 19 49 00 15-98 P co CCGG 112.790 -999.990 ... R5 2003 07 03 11 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 85295 MLO 2003 06 25 19 49 00 16-98 P co CCGG 110.740 -999.990 ... R5 2003 07 03 12 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 85296 MLO 2003 06 25 20 18 00 4523-91 S co CCGG 110.200 -999.990 S.. R5 2003 07 02 16 48 00 19.5300 -155.5800 3437.00 3397.00 40.00 85297 MLO 2003 06 25 20 18 00 4524-91 S co CCGG 108.640 -999.990 S.. R5 2003 07 02 17 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 85298 MLO 2003 06 27 20 14 00 1531-99 P co CCGG 106.730 -999.990 P.. R5 2003 07 09 16 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 85299 MLO 2003 06 27 20 14 00 1532-99 P co CCGG 102.950 -999.990 P.. R5 2003 07 09 16 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 85300 MLO 2003 07 02 19 58 00 565-99 P co CCGG 155.710 -999.990 .X. R5 2003 07 17 14 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 85301 MLO 2003 07 02 19 58 00 566-99 P co CCGG 154.220 -999.990 .X. R5 2003 07 17 14 17 00 19.5300 -155.5800 3402.00 3397.00 5.00 85302 MLO 2003 07 02 20 24 00 1063-91 S co CCGG 124.760 -999.990 S.. R5 2003 07 17 14 30 00 19.5300 -155.5800 3437.00 3397.00 40.00 85303 MLO 2003 07 02 20 24 00 1064-91 S co CCGG 122.600 -999.990 S.. R5 2003 07 17 14 43 00 19.5300 -155.5800 3437.00 3397.00 40.00 85304 MLO 2003 07 09 19 49 00 1599-99 P co CCGG 148.460 -999.990 .X. R5 2003 07 23 12 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 85305 MLO 2003 07 09 19 49 00 1600-99 P co CCGG 145.960 -999.990 .X. R5 2003 07 23 12 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 85306 MLO 2003 07 09 20 00 00 1601-99 S co CCGG 139.780 -999.990 S.. R5 2003 07 23 13 42 00 19.5300 -155.5800 3437.00 3397.00 40.00 85307 MLO 2003 07 09 20 00 00 1602-99 S co CCGG 138.440 -999.990 S.. R5 2003 07 23 13 55 00 19.5300 -155.5800 3437.00 3397.00 40.00 85308 MLO 2003 07 16 19 47 00 4207-91 P co CCGG 79.340 -999.990 ... R5 2003 07 30 13 53 00 19.5300 -155.5800 3402.00 3397.00 5.00 85309 MLO 2003 07 16 19 47 00 4208-91 P co CCGG 79.080 -999.990 ... R5 2003 07 30 14 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 85310 MLO 2003 07 16 20 00 00 211-91 S co CCGG 75.820 -999.990 S.. R5 2003 07 30 13 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 85311 MLO 2003 07 30 19 45 00 1677-99 P co CCGG 79.390 -999.990 ... R5 2003 08 15 14 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 85312 MLO 2003 07 30 19 45 00 1678-99 P co CCGG 77.840 -999.990 ... R5 2003 08 15 15 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 85313 MLO 2003 07 30 20 02 00 1679-99 S co CCGG 70.610 -999.990 S.. R5 2003 08 15 14 25 00 19.5300 -155.5800 3437.00 3397.00 40.00 85314 MLO 2003 07 30 20 02 00 1680-99 S co CCGG 70.860 -999.990 S.. R5 2003 08 15 14 38 00 19.5300 -155.5800 3437.00 3397.00 40.00 85315 MLO 2003 08 06 19 58 00 1725-99 P co CCGG 70.460 -999.990 ... R5 2003 08 20 10 00 00 19.5300 -155.5800 3402.00 3397.00 5.00 85316 MLO 2003 08 06 19 58 00 1726-99 P co CCGG 69.710 -999.990 ... R5 2003 08 20 10 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 85317 MLO 2003 08 06 20 17 00 1727-99 S co CCGG 68.180 -999.990 S.. R5 2003 08 20 10 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 85318 MLO 2003 08 06 20 17 00 1728-99 S co CCGG 67.700 -999.990 S.. R5 2003 08 20 11 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 85319 MLO 2003 08 13 19 58 00 6137-66 P co CCGG 72.910 -999.990 ... R5 2003 08 21 11 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 85320 MLO 2003 08 13 19 58 00 6138-66 P co CCGG 71.110 -999.990 ... R5 2003 08 21 12 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 85321 MLO 2003 08 13 20 16 00 6665-66 S co CCGG 67.200 -999.990 S.. R5 2003 08 21 12 24 00 19.5300 -155.5800 3437.00 3397.00 40.00 85322 MLO 2003 08 13 20 16 00 6666-66 S co CCGG 66.690 -999.990 S.. R5 2003 08 21 12 37 00 19.5300 -155.5800 3437.00 3397.00 40.00 85323 MLO 2003 08 20 19 37 00 1591-91 P co CCGG 73.270 -999.990 ... R5 2003 08 25 15 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 85324 MLO 2003 08 20 19 37 00 1592-91 P co CCGG 70.910 -999.990 ... R5 2003 08 25 16 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 85325 MLO 2003 08 20 20 00 00 429-91 S co CCGG 67.060 -999.990 S.. R5 2003 08 25 15 31 00 19.5300 -155.5800 3437.00 3397.00 40.00 85326 MLO 2003 08 20 20 00 00 430-91 S co CCGG 66.290 -999.990 S.. R5 2003 08 25 15 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 85327 MLO 2003 08 27 19 55 00 1799-99 P co CCGG 74.160 -999.990 ... R5 2003 09 04 09 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 85328 MLO 2003 08 27 19 55 00 1800-99 P co CCGG 71.400 -999.990 ... R5 2003 09 04 09 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 85329 MLO 2003 08 27 20 08 00 1805-99 S co CCGG 70.970 -999.990 S.. R5 2003 09 04 09 45 00 19.5300 -155.5800 3437.00 3397.00 40.00 85330 MLO 2003 08 27 20 08 00 1806-99 S co CCGG 69.920 -999.990 S.. R5 2003 09 04 09 58 00 19.5300 -155.5800 3437.00 3397.00 40.00 85331 MLO 2003 09 03 19 56 00 1359-99 P co CCGG 93.060 -999.990 ... R5 2003 09 10 10 37 00 19.5300 -155.5800 3402.00 3397.00 5.00 85332 MLO 2003 09 03 19 56 00 1360-99 P co CCGG 91.680 -999.990 ... R5 2003 09 10 10 50 00 19.5300 -155.5800 3402.00 3397.00 5.00 85333 MLO 2003 09 03 20 15 00 117-91 S co CCGG 85.500 -999.990 S.. R5 2003 09 10 11 55 00 19.5300 -155.5800 3437.00 3397.00 40.00 85334 MLO 2003 09 03 20 15 00 118-91 S co CCGG 84.930 -999.990 S.. R5 2003 09 10 12 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 85335 MLO 2003 09 10 19 56 00 1911-99 P co CCGG 89.470 -999.990 ... R5 2003 09 18 15 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 85336 MLO 2003 09 10 19 56 00 1912-99 P co CCGG 87.480 -999.990 ... R5 2003 09 18 15 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 85337 MLO 2003 09 10 20 13 00 129-99 S co CCGG 84.090 -999.990 S.. R5 2003 09 18 15 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 85338 MLO 2003 09 10 20 13 00 130-99 S co CCGG 84.280 -999.990 S.. R5 2003 09 18 15 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 85339 MLO 2003 09 17 19 45 00 1999-99 P co CCGG 95.210 -999.990 ... R5 2003 09 29 15 16 00 19.5300 -155.5800 3402.00 3397.00 5.00 85340 MLO 2003 09 17 19 45 00 2000-99 P co CCGG 93.020 -999.990 ... R5 2003 09 29 15 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 85341 MLO 2003 09 17 20 11 00 2037-99 S co CCGG 90.810 -999.990 S.. R5 2003 09 29 17 06 00 19.5300 -155.5800 3437.00 3397.00 40.00 85342 MLO 2003 09 17 20 11 00 2038-99 S co CCGG 90.880 -999.990 S.. R5 2003 09 29 17 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 85343 MLO 2003 09 24 19 50 00 1667-99 P co CCGG 76.770 -999.990 ... R5 2003 10 02 16 13 00 19.5300 -155.5800 3402.00 3397.00 5.00 85344 MLO 2003 09 24 19 50 00 1668-99 P co CCGG 75.330 -999.990 ... R5 2003 10 02 16 26 00 19.5300 -155.5800 3402.00 3397.00 5.00 85345 MLO 2003 09 24 20 12 00 1841-91 S co CCGG 70.660 -999.990 S.. R5 2003 10 02 16 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 85346 MLO 2003 09 24 20 12 00 1842-91 S co CCGG 70.180 -999.990 S.. R5 2003 10 02 16 52 00 19.5300 -155.5800 3437.00 3397.00 40.00 85347 MLO 2003 10 01 19 49 00 655-99 P co CCGG 75.750 -999.990 ... R5 2003 10 07 14 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 85348 MLO 2003 10 01 19 49 00 656-99 P co CCGG 73.410 -999.990 ... R5 2003 10 07 15 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 85349 MLO 2003 10 01 20 00 00 1517-99 S co CCGG 67.930 -999.990 S.. R5 2003 10 07 15 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 85350 MLO 2003 10 01 20 00 00 1518-99 S co CCGG 67.430 -999.990 S.. R5 2003 10 07 15 39 00 19.5300 -155.5800 3437.00 3397.00 40.00 85351 MLO 2003 10 08 20 10 00 6923-66 S co CCGG 96.600 -999.990 S.. R5 2003 10 16 11 42 00 19.5300 -155.5800 3437.00 3397.00 40.00 85352 MLO 2003 10 08 20 10 00 6924-66 S co CCGG 96.200 -999.990 S.. R5 2003 10 16 11 55 00 19.5300 -155.5800 3437.00 3397.00 40.00 85353 MLO 2003 10 08 20 21 00 265-99 P co CCGG 103.010 -999.990 ... R5 2003 10 16 12 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 85354 MLO 2003 10 08 20 21 00 266-99 P co CCGG 101.350 -999.990 ... R5 2003 10 16 12 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 85355 MLO 2003 10 15 19 56 00 601-99 P co CCGG 97.270 -999.990 ... R5 2003 10 29 12 33 00 19.5300 -155.5800 3402.00 3397.00 5.00 85356 MLO 2003 10 15 19 56 00 602-99 P co CCGG 96.470 -999.990 ... R5 2003 10 29 12 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 85357 MLO 2003 10 15 20 19 00 2177-99 S co CCGG 92.610 -999.990 S.. R5 2003 10 29 12 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 85358 MLO 2003 10 15 20 19 00 2178-99 S co CCGG 92.590 -999.990 S.. R5 2003 10 29 13 12 00 19.5300 -155.5800 3437.00 3397.00 40.00 85359 MLO 2003 10 22 19 52 00 651-99 P co CCGG 86.400 -999.990 ... R5 2003 10 28 16 56 00 19.5300 -155.5800 3402.00 3397.00 5.00 85360 MLO 2003 10 22 19 52 00 652-99 P co CCGG 84.900 -999.990 ... R5 2003 10 28 17 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 85361 MLO 2003 10 22 20 00 00 4845-91 S co CCGG 80.040 -999.990 S.. R5 2003 10 28 17 22 00 19.5300 -155.5800 3437.00 3397.00 40.00 85362 MLO 2003 10 22 20 00 00 4846-91 S co CCGG 79.340 -999.990 S.. R5 2003 10 28 17 35 00 19.5300 -155.5800 3437.00 3397.00 40.00 85363 MLO 2003 10 29 19 56 00 2129-99 P co CCGG 85.690 -999.990 ... R5 2003 11 07 14 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 85364 MLO 2003 10 29 19 56 00 2130-99 P co CCGG 84.100 -999.990 ... R5 2003 11 07 14 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 85365 MLO 2003 10 29 20 01 00 2131-99 S co CCGG 78.890 -999.990 S.. R5 2003 11 07 14 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 85366 MLO 2003 10 29 20 01 00 2132-99 S co CCGG 79.160 -999.990 S.. R5 2003 11 07 15 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 85367 MLO 2003 11 05 19 52 00 15-98 P co CCGG 107.510 -999.990 ... R5 2003 11 13 11 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 85368 MLO 2003 11 05 19 52 00 16-98 P co CCGG 106.910 -999.990 ... R5 2003 11 13 11 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 85369 MLO 2003 11 12 19 53 00 4603-91 P co CCGG 139.410 -999.990 .X. R5 2003 11 24 12 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 85370 MLO 2003 11 12 19 53 00 4604-91 P co CCGG 137.650 -999.990 .X. R5 2003 11 24 12 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 85371 MLO 2003 11 12 20 01 00 1925-91 S co CCGG 125.800 -999.990 S.. R5 2003 11 24 13 57 00 19.5300 -155.5800 3437.00 3397.00 40.00 85372 MLO 2003 11 12 20 01 00 1926-91 S co CCGG 126.750 -999.990 S.. R5 2003 11 24 14 10 00 19.5300 -155.5800 3437.00 3397.00 40.00 85373 MLO 2003 11 19 19 58 00 181-91 P co CCGG 115.710 -999.990 ... R5 2003 12 02 16 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 85374 MLO 2003 11 19 19 58 00 182-91 P co CCGG 114.120 -999.990 ... R5 2003 12 02 17 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 85375 MLO 2003 11 19 20 04 00 229-91 S co CCGG 114.940 -999.990 S.. R5 2003 12 02 16 29 00 19.5300 -155.5800 3437.00 3397.00 40.00 85376 MLO 2003 11 19 20 04 00 230-91 S co CCGG 114.620 -999.990 S.. R5 2003 12 02 16 42 00 19.5300 -155.5800 3437.00 3397.00 40.00 85377 MLO 2003 11 26 19 55 00 2241-99 P co CCGG 82.310 -999.990 ... R5 2003 12 09 17 35 00 19.5300 -155.5800 3402.00 3397.00 5.00 85378 MLO 2003 11 26 19 55 00 2242-99 P co CCGG 81.730 -999.990 ... R5 2003 12 09 17 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 85379 MLO 2003 11 26 20 19 00 6169-66 S co CCGG 83.170 -999.990 S.. R5 2003 12 11 15 53 00 19.5300 -155.5800 3437.00 3397.00 40.00 85380 MLO 2003 11 26 20 19 00 6170-66 S co CCGG 84.370 -999.990 S.. R5 2003 12 11 16 06 00 19.5300 -155.5800 3437.00 3397.00 40.00 85381 MLO 2003 12 03 19 54 00 2301-99 P co CCGG 77.370 -999.990 ... R5 2003 12 17 11 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 85382 MLO 2003 12 03 19 54 00 2302-99 P co CCGG 76.640 -999.990 ... R5 2003 12 17 11 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 85383 MLO 2003 12 03 20 14 00 1963-91 S co CCGG 73.880 -999.990 S.. R5 2003 12 17 11 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 85384 MLO 2003 12 03 20 14 00 1964-91 S co CCGG 73.590 -999.990 S.. R5 2003 12 17 11 21 00 19.5300 -155.5800 3437.00 3397.00 40.00 85385 MLO 2003 12 10 19 50 00 4077-91 P co CCGG 95.350 -999.990 ... R5 2003 12 22 10 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 85386 MLO 2003 12 10 19 50 00 4078-91 P co CCGG 93.310 -999.990 ... R5 2003 12 22 10 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 85387 MLO 2003 12 10 21 07 00 4315-91 S co CCGG 96.180 -999.990 S.. R5 2003 12 22 09 36 00 19.5300 -155.5800 3437.00 3397.00 40.00 85388 MLO 2003 12 10 21 07 00 4316-91 S co CCGG 94.930 -999.990 S.. R5 2003 12 22 09 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 85389 MLO 2003 12 17 20 04 00 1073-99 S co CCGG 93.210 -999.990 S.. R5 2004 01 07 14 31 00 19.5300 -155.5800 3437.00 3397.00 40.00 85390 MLO 2003 12 17 20 04 00 1074-99 S co CCGG 93.980 -999.990 S.. R5 2004 01 07 14 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 85391 MLO 2003 12 17 20 19 00 2427-99 P co CCGG 100.730 -999.990 P.. R5 2004 01 07 14 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 85392 MLO 2003 12 17 20 19 00 2428-99 P co CCGG 97.320 -999.990 P.. R5 2004 01 07 14 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 85393 MLO 2003 12 24 19 56 00 635-91 P co CCGG 103.300 -999.990 ... R5 2004 01 26 17 25 00 19.5300 -155.5800 3402.00 3397.00 5.00 85394 MLO 2003 12 24 19 56 00 636-91 P co CCGG 101.720 -999.990 ... R5 2004 01 26 17 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 85395 MLO 2003 12 24 20 03 00 199-98 S co CCGG 109.470 -999.990 S.. R5 2004 01 26 17 51 00 19.5300 -155.5800 3437.00 3397.00 40.00 85396 MLO 2003 12 24 20 03 00 200-98 S co CCGG 96.460 -999.990 S.. R5 2004 01 26 18 04 00 19.5300 -155.5800 3437.00 3397.00 40.00 85397 MLO 2003 12 31 20 10 00 469-99 P co CCGG 87.440 -999.990 ... R5 2004 01 09 14 34 00 19.5300 -155.5800 3402.00 3397.00 5.00 85398 MLO 2003 12 31 20 10 00 470-99 P co CCGG 85.620 -999.990 ... R5 2004 01 09 14 47 00 19.5300 -155.5800 3402.00 3397.00 5.00 85399 MLO 2003 12 31 21 12 00 345-91 S co CCGG 83.730 -999.990 S.. R5 2004 01 09 15 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 85400 MLO 2003 12 31 21 12 00 346-91 S co CCGG 81.200 -999.990 S.. R5 2004 01 09 15 15 00 19.5300 -155.5800 3437.00 3397.00 40.00 85401 MLO 2004 01 07 19 57 00 4473-91 P co CCGG 94.790 -999.990 ... R5 2004 01 15 16 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 85402 MLO 2004 01 07 19 57 00 4474-91 P co CCGG 93.190 -999.990 ... R5 2004 01 15 16 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 85403 MLO 2004 01 07 20 16 00 2003-91 S co CCGG 87.970 -999.990 S.. R5 2004 01 15 15 52 00 19.5300 -155.5800 3437.00 3397.00 40.00 85404 MLO 2004 01 07 20 16 00 2004-91 S co CCGG 88.020 -999.990 S.. R5 2004 01 15 16 05 00 19.5300 -155.5800 3437.00 3397.00 40.00 85405 MLO 2004 01 14 20 00 00 2535-99 P co CCGG 91.070 -999.990 ... R5 2004 01 22 13 44 00 19.5300 -155.5800 3402.00 3397.00 5.00 85406 MLO 2004 01 14 20 00 00 2536-99 P co CCGG 90.670 -999.990 ... R5 2004 01 22 13 57 00 19.5300 -155.5800 3402.00 3397.00 5.00 85407 MLO 2004 01 14 20 19 00 1519-99 S co CCGG 85.680 -999.990 S.. R5 2004 01 22 14 10 00 19.5300 -155.5800 3437.00 3397.00 40.00 85408 MLO 2004 01 14 20 19 00 1520-99 S co CCGG 85.780 -999.990 S.. R5 2004 01 22 14 23 00 19.5300 -155.5800 3437.00 3397.00 40.00 85409 MLO 2004 01 21 19 54 00 1455-99 P co CCGG 96.320 -999.990 ... R5 2004 02 02 10 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 85410 MLO 2004 01 21 19 54 00 1456-99 P co CCGG 94.690 -999.990 ... R5 2004 02 02 10 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 85411 MLO 2004 01 21 20 14 00 6197-66 S co CCGG 90.600 -999.990 S.. R5 2004 02 02 09 57 00 19.5300 -155.5800 3437.00 3397.00 40.00 85412 MLO 2004 01 21 20 14 00 6198-66 S co CCGG 90.780 -999.990 S.. R5 2004 02 02 10 10 00 19.5300 -155.5800 3437.00 3397.00 40.00 85413 MLO 2004 01 28 19 58 00 665-99 P co CCGG 105.650 -999.990 ... R5 2004 02 09 19 10 00 19.5300 -155.5800 3402.00 3397.00 5.00 85414 MLO 2004 01 28 19 58 00 666-99 P co CCGG 103.490 -999.990 ... R5 2004 02 09 19 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 85415 MLO 2004 01 28 20 16 00 477-99 S co CCGG 101.360 -999.990 S.. R5 2004 02 09 19 36 00 19.5300 -155.5800 3437.00 3397.00 40.00 85416 MLO 2004 01 28 20 16 00 478-99 S co CCGG 101.100 -999.990 S.. R5 2004 02 09 19 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 85417 MLO 2004 02 04 19 54 00 2099-99 P co CCGG 106.310 -999.990 ... R5 2004 02 11 16 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 85418 MLO 2004 02 04 19 54 00 2100-99 P co CCGG 105.070 -999.990 ... R5 2004 02 11 16 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 85419 MLO 2004 02 04 20 12 00 1409-99 S co CCGG 102.690 -999.990 S.. R5 2004 02 11 15 52 00 19.5300 -155.5800 3437.00 3397.00 40.00 85420 MLO 2004 02 04 20 12 00 1410-99 S co CCGG 102.320 -999.990 S.. R5 2004 02 11 16 05 00 19.5300 -155.5800 3437.00 3397.00 40.00 85421 MLO 2004 02 11 19 57 00 2641-99 P co CCGG 187.450 -999.990 .X. R5 2004 02 20 16 09 00 19.5300 -155.5800 3402.00 3397.00 5.00 85422 MLO 2004 02 11 19 57 00 2642-99 P co CCGG 186.450 -999.990 .X. R5 2004 02 20 16 22 00 19.5300 -155.5800 3402.00 3397.00 5.00 85423 MLO 2004 02 11 20 16 00 2651-99 S co CCGG 179.800 -999.990 S.. R5 2004 02 20 15 43 00 19.5300 -155.5800 3437.00 3397.00 40.00 85424 MLO 2004 02 11 20 16 00 2652-99 S co CCGG 179.580 -999.990 S.. R5 2004 02 20 15 56 00 19.5300 -155.5800 3437.00 3397.00 40.00 85425 MLO 2004 02 18 19 52 00 553-99 P co CCGG 107.990 -999.990 ... R5 2004 02 23 18 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 85426 MLO 2004 02 18 19 52 00 554-99 P co CCGG 105.600 -999.990 ... R5 2004 02 23 18 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 85427 MLO 2004 02 18 20 12 00 1055-99 S co CCGG 100.200 -999.990 S.. R5 2004 02 23 18 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 85428 MLO 2004 02 18 20 12 00 1056-99 S co CCGG 100.040 -999.990 S.. R5 2004 02 23 18 59 00 19.5300 -155.5800 3437.00 3397.00 40.00 85429 MLO 2004 02 25 19 59 00 1879-99 P co CCGG 93.810 -999.990 ... R5 2004 03 01 17 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 85430 MLO 2004 02 25 19 59 00 1880-99 P co CCGG 92.670 -999.990 ... R5 2004 03 01 18 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 85431 MLO 2004 02 25 20 17 00 1875-99 S co CCGG 89.380 -999.990 S.. R5 2004 03 01 17 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 85432 MLO 2004 02 25 20 17 00 1876-99 S co CCGG 89.330 -999.990 S.. R5 2004 03 01 17 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 85433 MLO 2004 03 03 19 53 00 1479-99 P co CCGG 97.820 -999.990 ... R5 2004 03 10 10 39 00 19.5300 -155.5800 3402.00 3397.00 5.00 85434 MLO 2004 03 03 19 53 00 1480-99 P co CCGG 96.430 -999.990 ... R5 2004 03 10 10 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 85435 MLO 2004 03 03 20 13 00 1581-99 S co CCGG 94.450 -999.990 S.. R5 2004 03 10 11 31 00 19.5300 -155.5800 3437.00 3397.00 40.00 85436 MLO 2004 03 03 20 13 00 1582-99 S co CCGG 93.970 -999.990 S.. R5 2004 03 10 11 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 85437 MLO 2004 03 10 19 56 00 2941-99 P co CCGG 142.830 -999.990 ... R5 2004 03 22 11 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 85438 MLO 2004 03 10 19 56 00 2942-99 P co CCGG 143.350 -999.990 ... R5 2004 03 22 12 04 00 19.5300 -155.5800 3402.00 3397.00 5.00 85439 MLO 2004 03 10 20 23 00 2943-99 S co CCGG 139.870 -999.990 S.. R5 2004 03 22 13 09 00 19.5300 -155.5800 3437.00 3397.00 40.00 85440 MLO 2004 03 10 20 23 00 2944-99 S co CCGG 139.580 -999.990 S.. R5 2004 03 22 13 22 00 19.5300 -155.5800 3437.00 3397.00 40.00 85441 MLO 2004 03 17 19 57 00 2363-99 P co CCGG 181.910 -999.990 .X. R5 2004 04 01 16 07 00 19.5300 -155.5800 3402.00 3397.00 5.00 85442 MLO 2004 03 17 19 57 00 2364-99 P co CCGG 181.000 -999.990 .X. R5 2004 04 01 16 20 00 19.5300 -155.5800 3402.00 3397.00 5.00 85443 MLO 2004 03 17 20 15 00 2973-99 S co CCGG 160.490 -999.990 S.. R5 2004 04 01 16 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 85444 MLO 2004 03 17 20 15 00 2974-99 S co CCGG 156.670 -999.990 S.. R5 2004 04 01 16 46 00 19.5300 -155.5800 3437.00 3397.00 40.00 85445 MLO 2004 03 24 19 58 00 3147-99 P co CCGG 103.090 -999.990 ... R5 2004 03 31 12 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 85446 MLO 2004 03 24 19 58 00 3148-99 P co CCGG 101.720 -999.990 ... R5 2004 03 31 12 55 00 19.5300 -155.5800 3402.00 3397.00 5.00 85447 MLO 2004 03 24 20 16 00 3159-99 S co CCGG 101.730 -999.990 S.. R5 2004 03 31 13 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 85448 MLO 2004 03 24 20 16 00 3160-99 S co CCGG 101.130 -999.990 S.. R5 2004 03 31 13 21 00 19.5300 -155.5800 3437.00 3397.00 40.00 85449 MLO 2004 03 31 19 52 00 3049-99 P co CCGG 143.630 -999.990 ... R5 2004 04 07 13 32 00 19.5300 -155.5800 3402.00 3397.00 5.00 85450 MLO 2004 03 31 19 52 00 3050-99 P co CCGG 140.900 -999.990 ... R5 2004 04 07 13 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 85451 MLO 2004 03 31 20 00 00 3017-99 S co CCGG 139.740 -999.990 S.. R5 2004 04 07 13 06 00 19.5300 -155.5800 3437.00 3397.00 40.00 85452 MLO 2004 03 31 20 00 00 3018-99 S co CCGG 138.900 -999.990 S.. R5 2004 04 07 13 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 85453 MLO 2004 04 07 20 01 00 59-99 P co CCGG 175.240 -999.990 .X. R5 2004 04 12 19 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 85454 MLO 2004 04 07 20 01 00 60-99 P co CCGG 174.070 -999.990 .X. R5 2004 04 12 19 19 00 19.5300 -155.5800 3402.00 3397.00 5.00 85455 MLO 2004 04 07 20 09 00 3171-99 S co CCGG 160.410 -999.990 S.. R5 2004 04 14 09 13 00 19.5300 -155.5800 3437.00 3397.00 40.00 85456 MLO 2004 04 07 20 09 00 3172-99 S co CCGG 160.920 -999.990 S.. R5 2004 04 14 09 26 00 19.5300 -155.5800 3437.00 3397.00 40.00 85457 MLO 2004 04 14 19 48 00 2509-99 P co CCGG 136.220 -999.990 ... R5 2004 04 19 16 27 00 19.5300 -155.5800 3402.00 3397.00 5.00 85458 MLO 2004 04 14 19 48 00 2510-99 P co CCGG 136.000 -999.990 ... R5 2004 04 19 16 40 00 19.5300 -155.5800 3402.00 3397.00 5.00 85459 MLO 2004 04 14 20 18 00 3229-99 S co CCGG 130.940 -999.990 S.. R5 2004 04 19 16 01 00 19.5300 -155.5800 3437.00 3397.00 40.00 85460 MLO 2004 04 14 20 18 00 3230-99 S co CCGG 131.430 -999.990 S.. R5 2004 04 19 16 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 85461 MLO 2004 04 21 20 12 00 213-99 P co CCGG 135.910 -999.990 ... R5 2004 04 27 10 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 85462 MLO 2004 04 21 20 12 00 214-99 P co CCGG 134.620 -999.990 ... R5 2004 04 27 11 12 00 19.5300 -155.5800 3402.00 3397.00 5.00 85463 MLO 2004 04 21 20 16 00 2459-99 S co CCGG 128.840 -999.990 S.. R5 2004 04 27 11 25 00 19.5300 -155.5800 3437.00 3397.00 40.00 85464 MLO 2004 04 21 20 16 00 2460-99 S co CCGG 129.370 -999.990 S.. R5 2004 04 27 11 38 00 19.5300 -155.5800 3437.00 3397.00 40.00 85465 MLO 2004 04 28 19 56 00 471-99 P co CCGG 116.350 -999.990 ... R5 2004 05 05 15 52 00 19.5300 -155.5800 3402.00 3397.00 5.00 85466 MLO 2004 04 28 19 56 00 472-99 P co CCGG 116.920 -999.990 ... R5 2004 05 05 16 06 00 19.5300 -155.5800 3402.00 3397.00 5.00 85467 MLO 2004 04 28 20 14 00 3345-99 S co CCGG 107.180 -999.990 S.. R5 2004 05 05 16 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 85468 MLO 2004 04 28 20 14 00 3346-99 S co CCGG 106.760 -999.990 S.. R5 2004 05 05 16 32 00 19.5300 -155.5800 3437.00 3397.00 40.00 85469 MLO 2004 05 05 19 54 00 2815-99 P co CCGG 132.990 -999.990 ... R5 2004 05 18 11 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 85470 MLO 2004 05 05 19 54 00 2816-99 P co CCGG 131.660 -999.990 ... R5 2004 05 18 11 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 85471 MLO 2004 05 05 20 15 00 1755-99 S co CCGG 123.170 -999.990 S.. R5 2004 05 18 11 15 00 19.5300 -155.5800 3437.00 3397.00 40.00 85472 MLO 2004 05 05 20 15 00 1756-99 S co CCGG 122.840 -999.990 S.. R5 2004 05 18 11 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 85473 MLO 2004 05 12 19 54 00 1805-99 P co CCGG 97.200 -999.990 ... R5 2004 05 24 13 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 85474 MLO 2004 05 12 19 54 00 1806-99 P co CCGG 96.030 -999.990 ... R5 2004 05 24 13 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 85475 MLO 2004 05 12 20 13 00 3459-99 S co CCGG 91.750 -999.990 S.. R5 2004 05 24 13 15 00 19.5300 -155.5800 3437.00 3397.00 40.00 85476 MLO 2004 05 12 20 13 00 3460-99 S co CCGG 92.070 -999.990 S.. R5 2004 05 24 13 28 00 19.5300 -155.5800 3437.00 3397.00 40.00 85477 MLO 2004 05 19 19 56 00 509-99 P co CCGG 76.510 -999.990 ... R5 2004 05 27 14 05 00 19.5300 -155.5800 3402.00 3397.00 5.00 85478 MLO 2004 05 19 19 56 00 510-99 P co CCGG 76.240 -999.990 ... R5 2004 05 27 14 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 85479 MLO 2004 05 19 20 02 00 2183-99 S co CCGG 77.650 -999.990 S.. R5 2004 05 27 14 31 00 19.5300 -155.5800 3437.00 3397.00 40.00 85480 MLO 2004 05 19 20 02 00 2184-99 S co CCGG 76.790 -999.990 S.. R5 2004 05 27 14 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 85481 MLO 2004 05 26 19 57 00 2199-99 P co CCGG 120.100 -999.990 ... R5 2004 06 01 14 29 00 19.5300 -155.5800 3402.00 3397.00 5.00 85482 MLO 2004 05 26 19 57 00 2200-99 P co CCGG 117.310 -999.990 ... R5 2004 06 01 14 42 00 19.5300 -155.5800 3402.00 3397.00 5.00 85483 MLO 2004 05 26 20 14 00 2777-99 S co CCGG 113.630 -999.990 S.. R5 2004 06 01 14 55 00 19.5300 -155.5800 3437.00 3397.00 40.00 85484 MLO 2004 05 26 20 14 00 2778-99 S co CCGG 112.930 -999.990 S.. R5 2004 06 01 15 08 00 19.5300 -155.5800 3437.00 3397.00 40.00 85485 MLO 2004 06 02 19 50 00 2279-99 P co CCGG 94.950 -999.990 ... R5 2004 06 08 10 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 85486 MLO 2004 06 02 19 50 00 2280-99 P co CCGG 92.150 -999.990 ... R5 2004 06 08 10 54 00 19.5300 -155.5800 3402.00 3397.00 5.00 85487 MLO 2004 06 02 20 17 00 2465-99 S co CCGG 87.430 -999.990 S.. R5 2004 06 08 11 07 00 19.5300 -155.5800 3437.00 3397.00 40.00 85488 MLO 2004 06 02 20 17 00 2466-99 S co CCGG 87.140 -999.990 S.. R5 2004 06 08 11 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 85489 MLO 2004 06 09 19 50 00 1499-99 P co CCGG 90.510 -999.990 ... R5 2004 06 18 11 23 00 19.5300 -155.5800 3402.00 3397.00 5.00 85490 MLO 2004 06 09 19 50 00 1500-99 P co CCGG 88.180 -999.990 ... R5 2004 06 18 11 36 00 19.5300 -155.5800 3402.00 3397.00 5.00 85491 MLO 2004 06 09 20 15 00 1559-99 S co CCGG 83.200 -999.990 S.. R5 2004 06 18 11 49 00 19.5300 -155.5800 3437.00 3397.00 40.00 85492 MLO 2004 06 09 20 15 00 1560-99 S co CCGG 83.320 -999.990 S.. R5 2004 06 18 12 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 85493 MLO 2004 06 16 19 53 00 2545-99 P co CCGG 92.960 -999.990 ... R5 2004 06 24 13 28 00 19.5300 -155.5800 3402.00 3397.00 5.00 85494 MLO 2004 06 16 19 53 00 2546-99 P co CCGG 90.990 -999.990 ... R5 2004 06 24 13 41 00 19.5300 -155.5800 3402.00 3397.00 5.00 85495 MLO 2004 06 16 20 14 00 3719-99 S co CCGG 86.540 -999.990 S.. R5 2004 06 24 13 02 00 19.5300 -155.5800 3437.00 3397.00 40.00 85496 MLO 2004 06 16 20 14 00 3720-99 S co CCGG 86.330 -999.990 S.. R5 2004 06 24 13 15 00 19.5300 -155.5800 3437.00 3397.00 40.00 85497 MLO 2004 06 23 19 55 00 3041-99 P co CCGG 78.890 -999.990 ... R5 2004 07 08 10 46 00 19.5300 -155.5800 3402.00 3397.00 5.00 85498 MLO 2004 06 23 19 55 00 3042-99 P co CCGG 76.750 -999.990 ... R5 2004 07 08 10 59 00 19.5300 -155.5800 3402.00 3397.00 5.00 85499 MLO 2004 06 23 20 00 00 461-99 S co CCGG 71.620 -999.990 S.. R5 2004 07 08 10 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 85500 MLO 2004 06 23 20 00 00 462-99 S co CCGG 71.030 -999.990 S.. R5 2004 07 08 10 33 00 19.5300 -155.5800 3437.00 3397.00 40.00 85501 MLO 2004 06 30 19 51 00 719-99 P co CCGG 68.330 -999.990 ... R5 2004 07 14 09 48 00 19.5300 -155.5800 3402.00 3397.00 5.00 85502 MLO 2004 06 30 19 51 00 720-99 P co CCGG 67.540 -999.990 ... R5 2004 07 14 10 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 85503 MLO 2004 06 30 20 15 00 3473-99 S co CCGG 63.040 -999.990 S.. R5 2004 07 14 10 14 00 19.5300 -155.5800 3437.00 3397.00 40.00 85504 MLO 2004 06 30 20 15 00 3474-99 S co CCGG 63.490 -999.990 S.. R5 2004 07 14 10 27 00 19.5300 -155.5800 3437.00 3397.00 40.00 85505 MLO 2004 07 07 19 47 00 2919-99 P co CCGG 83.090 -999.990 ... R5 2004 07 27 12 38 00 19.5300 -155.5800 3402.00 3397.00 5.00 85506 MLO 2004 07 07 19 47 00 2920-99 P co CCGG 81.040 -999.990 ... R5 2004 07 27 12 51 00 19.5300 -155.5800 3402.00 3397.00 5.00 85507 MLO 2004 07 07 20 12 00 179-99 S co CCGG 74.610 -999.990 S.. R5 2004 07 27 12 12 00 19.5300 -155.5800 3437.00 3397.00 40.00 85508 MLO 2004 07 07 20 12 00 180-99 S co CCGG 74.520 -999.990 S.. R5 2004 07 27 12 25 00 19.5300 -155.5800 3437.00 3397.00 40.00 85509 MLO 2004 07 14 20 10 00 3075-99 P co CCGG 103.520 -999.990 ... R5 2004 07 30 13 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 85510 MLO 2004 07 14 20 10 00 3076-99 P co CCGG 101.230 -999.990 ... R5 2004 07 30 13 31 00 19.5300 -155.5800 3402.00 3397.00 5.00 85511 MLO 2004 07 14 20 14 00 3079-99 S co CCGG 95.710 -999.990 S.. R5 2004 07 30 13 44 00 19.5300 -155.5800 3437.00 3397.00 40.00 85512 MLO 2004 07 14 20 14 00 3080-99 S co CCGG 94.970 -999.990 S.. R5 2004 07 30 13 57 00 19.5300 -155.5800 3437.00 3397.00 40.00 85513 MLO 2004 07 21 19 56 00 545-99 P co CCGG 84.990 -999.990 ... R5 2004 08 09 15 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 85514 MLO 2004 07 21 19 56 00 546-99 P co CCGG 83.710 -999.990 ... R5 2004 08 09 16 11 00 19.5300 -155.5800 3402.00 3397.00 5.00 85515 MLO 2004 07 21 20 14 00 1735-99 S co CCGG 77.550 -999.990 S.. R5 2004 08 10 12 07 00 19.5300 -155.5800 3437.00 3397.00 40.00 85516 MLO 2004 07 21 20 14 00 1736-99 S co CCGG 77.280 -999.990 S.. R5 2004 08 10 12 20 00 19.5300 -155.5800 3437.00 3397.00 40.00 85517 MLO 2004 07 28 20 19 00 1587-99 S co CCGG 70.060 -999.990 S.. R5 2004 08 16 11 19 00 19.5300 -155.5800 3437.00 3397.00 40.00 85518 MLO 2004 07 28 20 19 00 1588-99 S co CCGG 68.450 -999.990 S.. R5 2004 08 16 11 32 00 19.5300 -155.5800 3437.00 3397.00 40.00 85519 MLO 2004 07 28 22 02 00 3465-99 P co CCGG 77.980 -999.990 ... R5 2004 08 16 11 45 00 19.5300 -155.5800 3402.00 3397.00 5.00 85520 MLO 2004 07 28 22 02 00 3466-99 P co CCGG 75.350 -999.990 ... R5 2004 08 16 11 58 00 19.5300 -155.5800 3402.00 3397.00 5.00 85521 MLO 2004 08 04 20 04 00 3855-99 P co CCGG 67.920 -999.990 ... R5 2004 08 19 18 08 00 19.5300 -155.5800 3402.00 3397.00 5.00 85522 MLO 2004 08 04 20 04 00 3856-99 P co CCGG 65.320 -999.990 ... R5 2004 08 19 18 21 00 19.5300 -155.5800 3402.00 3397.00 5.00 85523 MLO 2004 08 04 20 07 00 3845-99 S co CCGG 59.840 -999.990 S.. R5 2004 08 19 17 42 00 19.5300 -155.5800 3437.00 3397.00 40.00 85524 MLO 2004 08 04 20 07 00 3846-99 S co CCGG 60.020 -999.990 S.. R5 2004 08 19 17 55 00 19.5300 -155.5800 3437.00 3397.00 40.00 85525 MLO 2004 08 11 19 58 00 3857-99 P co CCGG 77.420 -999.990 P.. R5 2004 08 25 21 01 00 19.5300 -155.5800 3402.00 3397.00 5.00 85526 MLO 2004 08 11 19 58 00 3858-99 P co CCGG 71.180 -999.990 P.. R5 2004 08 25 21 14 00 19.5300 -155.5800 3402.00 3397.00 5.00 85527 MLO 2004 08 11 20 14 00 3869-99 S co CCGG 66.050 -999.990 S.. R5 2004 08 25 21 27 00 19.5300 -155.5800 3437.00 3397.00 40.00 85528 MLO 2004 08 11 20 14 00 3870-99 S co CCGG 66.310 -999.990 S.. R5 2004 08 25 21 40 00 19.5300 -155.5800 3437.00 3397.00 40.00 85529 MLO 2004 08 18 19 54 00 652-99 P co CCGG 67.160 -999.990 ... R5 2004 08 26 16 18 00 19.5300 -155.5800 3402.00 3397.00 5.00 85530 MLO 2004 08 18 20 16 00 2991-99 S co CCGG 64.040 -999.990 S.. R5 2004 08 26 14 58 00 19.5300 -155.5800 3437.00 3397.00 40.00 85531 MLO 2004 08 18 20 16 00 2992-99 S co CCGG 63.550 -999.990 S.. R5 2004 08 26 15 11 00 19.5300 -155.5800 3437.00 3397.00 40.00 85532 MLO 2004 08 25 19 48 00 2561-99 S co CCGG 74.470 -999.990 S.. R5 2004 09 28 16 30 00 19.5300 -155.5600 3437.00 3397.00 40.00 188522 MLO 2004 08 25 19 48 00 2562-99 S co CCGG 74.470 -999.990 S.. R5 2004 09 28 16 44 00 19.5300 -155.5600 3437.00 3397.00 40.00 188523 MLO 2004 08 25 20 06 00 2785-99 P co CCGG 82.510 -999.990 ... R5 2004 09 28 15 06 00 19.5300 -155.5600 3402.00 3397.00 5.00 188524 MLO 2004 08 25 20 06 00 2786-99 P co CCGG 79.360 -999.990 ... R5 2004 09 28 15 20 00 19.5300 -155.5600 3402.00 3397.00 5.00 188525 MLO 2004 09 01 19 41 00 3221-99 P co CCGG 84.470 -999.990 ... R5 2004 10 05 13 43 00 19.5300 -155.5600 3402.00 3397.00 5.00 189111 MLO 2004 09 01 19 41 00 3222-99 P co CCGG 82.670 -999.990 ... R5 2004 10 05 13 58 00 19.5300 -155.5600 3402.00 3397.00 5.00 189112 MLO 2004 09 08 19 57 00 3357-99 P co CCGG 79.010 -999.990 ... R5 2004 10 05 11 51 00 19.5300 -155.5600 3402.00 3397.00 5.00 189117 MLO 2004 09 08 19 57 00 3358-99 P co CCGG 78.820 -999.990 ... R5 2004 10 05 12 05 00 19.5300 -155.5600 3402.00 3397.00 5.00 189118 MLO 2004 09 08 20 19 00 3989-99 S co CCGG 74.350 -999.990 S.. R5 2004 10 05 13 15 00 19.5300 -155.5600 3437.00 3397.00 40.00 189119 MLO 2004 09 08 20 19 00 3990-99 S co CCGG 74.130 -999.990 S.. R5 2004 10 05 13 29 00 19.5300 -155.5600 3437.00 3397.00 40.00 189120 MLO 2004 09 15 00 00 00 2649-99 S co CCGG 64.670 -999.990 S.. R5 2004 10 18 10 07 00 19.5300 -155.5600 3437.00 3397.00 40.00 190201 MLO 2004 09 15 00 00 00 2650-99 S co CCGG 64.100 -999.990 S.. R5 2004 10 18 10 21 00 19.5300 -155.5600 3437.00 3397.00 40.00 190202 MLO 2004 09 15 19 54 00 4053-99 P co CCGG 69.550 -999.990 ... R5 2004 10 18 10 35 00 19.5300 -155.5600 3402.00 3397.00 5.00 190203 MLO 2004 09 15 19 54 00 4054-99 P co CCGG 68.000 -999.990 ... R5 2004 10 18 10 50 00 19.5300 -155.5600 3402.00 3397.00 5.00 190204 MLO 2004 09 22 19 51 00 3637-99 P co CCGG 80.230 -999.990 ... R5 2004 10 12 20 07 00 19.5300 -155.5600 3402.00 3397.00 5.00 189529 MLO 2004 09 22 19 51 00 3638-99 P co CCGG 79.510 -999.990 ... R5 2004 10 12 20 22 00 19.5300 -155.5600 3402.00 3397.00 5.00 189530 MLO 2004 09 22 20 12 00 2861-99 S co CCGG 75.750 -999.990 S.. R5 2004 10 12 19 39 00 19.5300 -155.5600 3437.00 3397.00 40.00 189527 MLO 2004 09 22 20 12 00 2862-99 S co CCGG 76.000 -999.990 S.. R5 2004 10 12 19 53 00 19.5300 -155.5600 3437.00 3397.00 40.00 189528 MLO 2004 09 29 19 56 00 895-99 P co CCGG 72.180 -999.990 ... R5 2004 10 08 11 54 00 19.5300 -155.5600 3402.00 3397.00 5.00 189805 MLO 2004 09 29 19 56 00 896-99 P co CCGG 70.870 -999.990 ... R5 2004 10 08 12 08 00 19.5300 -155.5600 3402.00 3397.00 5.00 189806 MLO 2004 09 29 20 18 00 2495-99 S co CCGG 69.540 -999.990 S.. R5 2004 10 08 14 13 00 19.5300 -155.5600 3437.00 3397.00 40.00 189807 MLO 2004 09 29 20 18 00 2496-99 S co CCGG 69.090 -999.990 S.. R5 2004 10 08 14 27 00 19.5300 -155.5600 3437.00 3397.00 40.00 189808 MLO 2004 10 06 19 48 00 2771-99 P co CCGG 105.620 -999.990 ... R5 2004 11 08 16 18 00 19.5300 -155.5600 3402.00 3397.00 5.00 191328 MLO 2004 10 06 19 48 00 2772-99 P co CCGG 105.460 -999.990 ... R5 2004 11 08 16 32 00 19.5300 -155.5600 3402.00 3397.00 5.00 191329 MLO 2004 10 06 20 15 00 55-99 S co CCGG 106.630 -999.990 S.. R5 2004 11 08 16 47 00 19.5300 -155.5600 3437.00 3397.00 40.00 191330 MLO 2004 10 06 20 15 00 56-99 S co CCGG 107.520 -999.990 S.. R5 2004 11 08 17 01 00 19.5300 -155.5600 3437.00 3397.00 40.00 191331 MLO 2004 10 13 19 48 00 4151-99 P co CCGG 79.020 -999.990 ... R5 2004 11 01 13 36 00 19.5300 -155.5600 3402.00 3397.00 5.00 190705 MLO 2004 10 13 19 48 00 4152-99 P co CCGG 78.820 -999.990 ... R5 2004 11 01 13 50 00 19.5300 -155.5600 3402.00 3397.00 5.00 190706 MLO 2004 10 13 20 21 00 4153-99 S co CCGG 77.290 -999.990 S.. R5 2004 11 01 15 01 00 19.5300 -155.5600 3437.00 3397.00 40.00 190703 MLO 2004 10 13 20 21 00 4154-99 S co CCGG 76.460 -999.990 S.. R5 2004 11 01 15 15 00 19.5300 -155.5600 3437.00 3397.00 40.00 190704 MLO 2004 10 20 19 49 00 1981-99 S co CCGG 78.310 -999.990 S.. R5 2004 10 29 13 41 00 19.5300 -155.5600 3437.00 3397.00 40.00 190838 MLO 2004 10 20 19 49 00 1982-99 S co CCGG 79.480 -999.990 S.. R5 2004 10 29 13 55 00 19.5300 -155.5600 3437.00 3397.00 40.00 190839 MLO 2004 10 20 20 12 00 809-99 P co CCGG 82.940 -999.990 ... R5 2004 10 29 14 09 00 19.5300 -155.5600 3402.00 3397.00 5.00 190836 MLO 2004 10 20 20 12 00 810-99 P co CCGG 81.380 -999.990 ... R5 2004 10 29 14 23 00 19.5300 -155.5600 3402.00 3397.00 5.00 190837 MLO 2004 10 27 19 44 00 1355-99 P co CCGG 81.830 -999.990 ... R5 2004 11 08 13 23 00 19.5300 -155.5600 3402.00 3397.00 5.00 191336 MLO 2004 10 27 19 44 00 1356-99 P co CCGG 78.970 -999.990 ... R5 2004 11 08 13 37 00 19.5300 -155.5600 3402.00 3397.00 5.00 191337 MLO 2004 11 02 19 56 00 2145-99 P co CCGG 80.430 -999.990 ... R5 2004 11 10 13 57 00 19.5300 -155.5600 3402.00 3397.00 5.00 191543 MLO 2004 11 02 19 56 00 2146-99 P co CCGG 79.070 -999.990 ... R5 2004 11 10 14 11 00 19.5300 -155.5600 3402.00 3397.00 5.00 191544 MLO 2004 11 02 20 16 00 3349-99 S co CCGG 75.050 -999.990 S.. R5 2004 11 10 12 28 00 19.5300 -155.5600 3437.00 3397.00 40.00 191545 MLO 2004 11 02 20 16 00 3350-99 S co CCGG 73.600 -999.990 S.. R5 2004 11 10 12 42 00 19.5300 -155.5600 3437.00 3397.00 40.00 191546 MLO 2004 11 10 19 53 00 2843-99 P co CCGG 139.260 -999.990 .X. R5 2004 11 16 14 06 00 19.5300 -155.5600 3402.00 3397.00 5.00 191748 MLO 2004 11 10 19 53 00 2844-99 P co CCGG 136.700 -999.990 .X. R5 2004 11 16 14 20 00 19.5300 -155.5600 3402.00 3397.00 5.00 191749 MLO 2004 11 10 20 20 00 2917-99 S co CCGG 122.090 -999.990 S.. R5 2004 11 16 13 38 00 19.5300 -155.5600 3437.00 3397.00 40.00 191750 MLO 2004 11 10 20 20 00 2918-99 S co CCGG 125.450 -999.990 .S. R5 2004 11 16 13 52 00 19.5300 -155.5600 3437.00 3397.00 40.00 191751 MLO 2004 11 17 19 58 00 1609-99 P co CCGG 103.790 -999.990 ... R5 2004 12 06 11 10 00 19.5300 -155.5600 3402.00 3397.00 5.00 192267 MLO 2004 11 17 19 58 00 1610-99 P co CCGG 102.580 -999.990 ... R5 2004 12 06 11 25 00 19.5300 -155.5600 3402.00 3397.00 5.00 192268 MLO 2004 11 17 20 20 00 3573-99 S co CCGG 128.240 -999.990 S.. R5 2004 12 06 09 18 00 19.5300 -155.5600 3437.00 3397.00 40.00 192269 MLO 2004 11 17 20 20 00 3574-99 S co CCGG 114.070 -999.990 S.. R5 2004 12 06 09 32 00 19.5300 -155.5600 3437.00 3397.00 40.00 192270 MLO 2004 11 24 19 57 00 3475-99 P co CCGG 102.380 -999.990 ... R5 2004 12 06 15 24 00 19.5300 -155.5600 3402.00 3397.00 5.00 192328 MLO 2004 11 24 19 57 00 3476-99 P co CCGG 101.740 -999.990 ... R5 2004 12 06 15 38 00 19.5300 -155.5600 3402.00 3397.00 5.00 192329 MLO 2004 11 24 20 20 00 2947-99 S co CCGG 101.130 -999.990 S.. R5 2004 12 06 14 56 00 19.5300 -155.5600 3437.00 3397.00 40.00 192326 MLO 2004 11 24 20 20 00 2948-99 S co CCGG 101.360 -999.990 S.. R5 2004 12 06 15 10 00 19.5300 -155.5600 3437.00 3397.00 40.00 192327 MLO 2004 12 01 19 57 00 1853-99 P co CCGG 102.880 -999.990 ... R5 2004 12 30 12 36 00 19.5300 -155.5600 3402.00 3397.00 5.00 193337 MLO 2004 12 01 19 57 00 1854-99 P co CCGG 102.070 -999.990 ... R5 2004 12 30 12 50 00 19.5300 -155.5600 3402.00 3397.00 5.00 193338 MLO 2004 12 01 20 24 00 6075-66 S co CCGG 688.950 -999.990 S.C R5 2004 12 30 11 11 00 19.5300 -155.5600 3437.00 3397.00 40.00 193339 MLO 2004 12 01 20 24 00 6076-66 S co CCGG 100.670 -999.990 S.. R5 2004 12 30 11 25 00 19.5300 -155.5600 3437.00 3397.00 40.00 193340 MLO 2004 12 08 19 50 00 4159-99 P co CCGG 97.500 -999.990 ... R5 2004 12 14 13 10 00 19.5300 -155.5600 3402.00 3397.00 5.00 192873 MLO 2004 12 08 19 50 00 4160-99 P co CCGG 97.020 -999.990 ... R5 2004 12 14 13 24 00 19.5300 -155.5600 3402.00 3397.00 5.00 192874 MLO 2004 12 08 20 02 00 6501-66 S co CCGG 92.680 -999.990 S.. R5 2004 12 14 12 42 00 19.5300 -155.5600 3437.00 3397.00 40.00 192875 MLO 2004 12 08 20 02 00 6502-66 S co CCGG 92.690 -999.990 S.. R5 2004 12 14 12 56 00 19.5300 -155.5600 3437.00 3397.00 40.00 192876 MLO 2004 12 15 19 52 00 2053-99 P co CCGG 100.540 -999.990 ... R5 2005 01 03 14 45 00 19.5300 -155.5600 3402.00 3397.00 5.00 193361 MLO 2004 12 15 19 52 00 2054-99 P co CCGG 100.020 -999.990 ... R5 2005 01 03 14 59 00 19.5300 -155.5600 3402.00 3397.00 5.00 193362 MLO 2004 12 15 20 24 00 1057-99 S co CCGG 95.400 -999.990 S.. R5 2005 01 03 12 44 00 19.5300 -155.5600 3437.00 3397.00 40.00 193359 MLO 2004 12 15 20 24 00 1058-99 S co CCGG 93.690 -999.990 S.. R5 2005 01 03 12 58 00 19.5300 -155.5600 3437.00 3397.00 40.00 193360 MLO 2004 12 22 19 50 00 3355-99 P co CCGG 98.310 -999.990 P.. R5 2005 01 05 15 35 00 19.5300 -155.5600 3402.00 3397.00 5.00 193420 MLO 2004 12 22 19 50 00 3356-99 P co CCGG 105.670 -999.990 P.. R5 2005 01 05 15 49 00 19.5300 -155.5600 3402.00 3397.00 5.00 193421 MLO 2004 12 22 20 20 00 905-99 S co CCGG 94.010 -999.990 S.. R5 2005 01 05 15 06 00 19.5300 -155.5600 3437.00 3397.00 40.00 193422 MLO 2004 12 22 20 20 00 906-99 S co CCGG 93.610 -999.990 S.. R5 2005 01 05 15 20 00 19.5300 -155.5600 3437.00 3397.00 40.00 193423 MLO 2004 12 29 19 56 00 3393-99 P co CCGG 101.540 -999.990 ... R5 2005 01 12 13 40 00 19.5300 -155.5600 3402.00 3397.00 5.00 193846 MLO 2004 12 29 19 56 00 3394-99 P co CCGG 99.980 -999.990 ... R5 2005 01 12 13 54 00 19.5300 -155.5600 3402.00 3397.00 5.00 193847 MLO 2004 12 29 20 13 00 3913-99 S co CCGG 97.250 -999.990 S.. R5 2005 01 12 10 46 00 19.5300 -155.5600 3437.00 3397.00 40.00 193850 MLO 2004 12 29 20 13 00 3914-99 S co CCGG 98.060 -999.990 S.. R5 2005 01 12 11 00 00 19.5300 -155.5600 3437.00 3397.00 40.00 193851 MLO 2005 01 05 19 52 00 3893-99 P co CCGG 111.300 -999.990 ... R5 2005 01 12 12 11 00 19.5300 -155.5600 3402.00 3397.00 5.00 193848 MLO 2005 01 05 19 52 00 3894-99 P co CCGG 108.730 -999.990 ... R5 2005 01 12 12 25 00 19.5300 -155.5600 3402.00 3397.00 5.00 193849 MLO 2005 01 05 20 20 00 3073-99 S co CCGG 106.430 -999.990 S.. R5 2005 01 12 11 14 00 19.5300 -155.5600 3437.00 3397.00 40.00 193844 MLO 2005 01 05 20 20 00 3074-99 S co CCGG 104.830 -999.990 S.. R5 2005 01 12 11 28 00 19.5300 -155.5600 3437.00 3397.00 40.00 193845 MLO 2005 01 12 21 18 00 6035-66 S co CCGG 120.610 -999.990 S.. R5 2005 01 21 14 20 00 19.5300 -155.5600 3437.00 3397.00 40.00 194215 MLO 2005 01 12 21 18 00 6036-66 S co CCGG 120.460 -999.990 S.. R5 2005 01 21 14 34 00 19.5300 -155.5600 3437.00 3397.00 40.00 194216 MLO 2005 01 12 21 34 00 1129-99 P co CCGG 128.480 -999.990 ... R5 2005 01 21 14 48 00 19.5300 -155.5600 3402.00 3397.00 5.00 194213 MLO 2005 01 12 21 34 00 1130-99 P co CCGG 126.430 -999.990 ... R5 2005 01 21 15 02 00 19.5300 -155.5600 3402.00 3397.00 5.00 194214 MLO 2005 01 19 19 56 00 1423-99 P co CCGG 89.970 -999.990 ... R5 2005 02 01 15 41 00 19.5300 -155.5600 3402.00 3397.00 5.00 194579 MLO 2005 01 19 19 56 00 1424-99 P co CCGG 88.070 -999.990 ... R5 2005 02 01 15 55 00 19.5300 -155.5600 3402.00 3397.00 5.00 194580 MLO 2005 01 19 20 16 00 3791-99 S co CCGG 83.420 -999.990 S.. R5 2005 02 01 16 09 00 19.5300 -155.5600 3437.00 3397.00 40.00 194581 MLO 2005 01 19 20 16 00 3792-99 S co CCGG 81.860 -999.990 S.. R5 2005 02 01 16 23 00 19.5300 -155.5600 3437.00 3397.00 40.00 194582 MLO 2005 01 26 19 56 00 1487-99 P co CCGG 95.790 -999.990 ... R5 2005 02 07 15 21 00 19.5300 -155.5600 3402.00 3397.00 5.00 194687 MLO 2005 01 26 19 56 00 1488-99 P co CCGG 95.230 -999.990 ... R5 2005 02 07 15 35 00 19.5300 -155.5600 3402.00 3397.00 5.00 194688 MLO 2005 01 26 20 01 00 1283-99 S co CCGG 91.780 -999.990 S.. R5 2005 02 07 14 53 00 19.5300 -155.5600 3437.00 3397.00 40.00 194685 MLO 2005 01 26 20 01 00 1284-99 S co CCGG 92.180 -999.990 S.. R5 2005 02 07 15 07 00 19.5300 -155.5600 3437.00 3397.00 40.00 194686 MLO 2005 02 02 19 55 00 4029-99 P co CCGG 115.240 -999.990 ... R5 2005 02 11 14 57 00 19.5300 -155.5600 3402.00 3397.00 5.00 194969 MLO 2005 02 02 19 55 00 4030-99 P co CCGG 113.080 -999.990 ... R5 2005 02 11 15 11 00 19.5300 -155.5600 3402.00 3397.00 5.00 194970 MLO 2005 02 02 20 18 00 4031-99 S co CCGG 108.630 -999.990 S.. R5 2005 02 11 14 28 00 19.5300 -155.5600 3437.00 3397.00 40.00 194967 MLO 2005 02 02 20 18 00 4032-99 S co CCGG 110.240 -999.990 S.. R5 2005 02 11 14 42 00 19.5300 -155.5600 3437.00 3397.00 40.00 194968 MLO 2005 02 09 19 55 00 3191-99 P co CCGG 100.250 -999.990 ... R5 2005 02 16 12 18 00 19.5300 -155.5600 3402.00 3397.00 5.00 195123 MLO 2005 02 09 19 55 00 3192-99 P co CCGG 98.410 -999.990 ... R5 2005 02 16 12 32 00 19.5300 -155.5600 3402.00 3397.00 5.00 195124 MLO 2005 02 09 20 01 00 1539-99 S co CCGG 96.640 -999.990 S.. R5 2005 02 16 12 46 00 19.5300 -155.5600 3437.00 3397.00 40.00 195121 MLO 2005 02 09 20 01 00 1540-99 S co CCGG 96.390 -999.990 S.. R5 2005 02 16 13 00 00 19.5300 -155.5600 3437.00 3397.00 40.00 195122 MLO 2005 02 16 19 58 00 2989-99 P co CCGG 131.300 -999.990 ... R5 2005 02 24 13 13 00 19.5300 -155.5600 3402.00 3397.00 5.00 195436 MLO 2005 02 16 19 58 00 2990-99 P co CCGG 128.380 -999.990 ... R5 2005 02 24 13 27 00 19.5300 -155.5600 3402.00 3397.00 5.00 195437 MLO 2005 02 16 20 21 00 6397-66 S co CCGG 128.190 -999.990 S.. R5 2005 02 24 12 45 00 19.5300 -155.5600 3437.00 3397.00 40.00 195438 MLO 2005 02 16 20 21 00 6398-66 S co CCGG 127.610 -999.990 S.. R5 2005 02 24 12 59 00 19.5300 -155.5600 3437.00 3397.00 40.00 195439 MLO 2005 02 23 19 56 00 149-99 P co CCGG 144.450 -999.990 ... R5 2005 03 02 11 58 00 19.5300 -155.5600 3402.00 3397.00 5.00 195957 MLO 2005 02 23 19 56 00 150-99 P co CCGG 146.060 -999.990 ... R5 2005 03 02 12 12 00 19.5300 -155.5600 3402.00 3397.00 5.00 195958 MLO 2005 02 23 20 20 00 3703-99 S co CCGG 136.050 -999.990 S.. R5 2005 03 02 12 27 00 19.5300 -155.5600 3437.00 3397.00 40.00 195959 MLO 2005 02 23 20 20 00 3704-99 S co CCGG 135.230 -999.990 S.. R5 2005 03 02 12 41 00 19.5300 -155.5600 3437.00 3397.00 40.00 195960 MLO 2005 03 02 19 57 00 3089-99 P co CCGG 195.840 -999.990 P.. R5 2005 03 10 12 25 00 19.5300 -155.5600 3402.00 3397.00 5.00 196277 MLO 2005 03 02 19 57 00 3090-99 P co CCGG 202.770 -999.990 P.. R5 2005 03 10 12 39 00 19.5300 -155.5600 3402.00 3397.00 5.00 196278 MLO 2005 03 02 20 02 00 6665-66 S co CCGG 184.370 -999.990 S.. R5 2005 03 10 11 57 00 19.5300 -155.5600 3437.00 3397.00 40.00 196279 MLO 2005 03 02 20 02 00 6666-66 S co CCGG 183.050 -999.990 S.. R5 2005 03 10 12 11 00 19.5300 -155.5600 3437.00 3397.00 40.00 196280 MLO 2005 03 09 19 59 00 1867-99 P co CCGG 111.340 -999.990 ... R5 2005 03 17 11 02 00 19.5300 -155.5600 3402.00 3397.00 5.00 196621 MLO 2005 03 09 19 59 00 1868-99 P co CCGG 108.580 -999.990 ... R5 2005 03 17 11 16 00 19.5300 -155.5600 3402.00 3397.00 5.00 196622 MLO 2005 03 09 20 22 00 2901-99 S co CCGG 106.560 -999.990 S.. R5 2005 03 16 14 34 00 19.5300 -155.5600 3437.00 3397.00 40.00 196623 MLO 2005 03 09 20 22 00 2902-99 S co CCGG 104.900 -999.990 S.. R5 2005 03 16 14 48 00 19.5300 -155.5600 3437.00 3397.00 40.00 196624 MLO 2005 03 16 19 59 00 2341-99 P co CCGG 158.570 -999.990 ... R5 2005 03 22 13 47 00 19.5300 -155.5600 3402.00 3397.00 5.00 196753 MLO 2005 03 16 19 59 00 2342-99 P co CCGG 156.190 -999.990 ... R5 2005 03 22 14 01 00 19.5300 -155.5600 3402.00 3397.00 5.00 196754 MLO 2005 03 16 20 08 00 3029-99 S co CCGG 156.850 -999.990 S.. R5 2005 03 22 13 18 00 19.5300 -155.5600 3437.00 3397.00 40.00 196755 MLO 2005 03 16 20 08 00 3030-99 S co CCGG 153.920 -999.990 S.. R5 2005 03 22 13 33 00 19.5300 -155.5600 3437.00 3397.00 40.00 196756 MLO 2005 03 23 19 58 00 3783-99 P co CCGG 116.690 -999.990 ... R5 2005 03 31 13 09 00 19.5300 -155.5600 3402.00 3397.00 5.00 197085 MLO 2005 03 23 19 58 00 3784-99 P co CCGG 116.220 -999.990 ... R5 2005 03 31 13 23 00 19.5300 -155.5600 3402.00 3397.00 5.00 197086 MLO 2005 03 23 20 20 00 2935-99 S co CCGG 112.180 -999.990 S.. R5 2005 03 31 13 37 00 19.5300 -155.5600 3437.00 3397.00 40.00 197083 MLO 2005 03 23 20 20 00 2936-99 S co CCGG 112.940 -999.990 S.. R5 2005 03 31 13 51 00 19.5300 -155.5600 3437.00 3397.00 40.00 197084 MLO 2005 03 30 19 56 00 2409-99 P co CCGG 128.970 -999.990 ... R5 2005 04 06 11 10 00 19.5300 -155.5600 3402.00 3397.00 5.00 197325 MLO 2005 03 30 19 56 00 2410-99 P co CCGG 127.950 -999.990 ... R5 2005 04 06 11 24 00 19.5300 -155.5600 3402.00 3397.00 5.00 197326 MLO 2005 03 30 20 02 00 341-99 S co CCGG 124.510 -999.990 S.. R5 2005 04 06 10 41 00 19.5300 -155.5600 3437.00 3397.00 40.00 197327 MLO 2005 03 30 20 02 00 342-99 S co CCGG 123.850 -999.990 S.. R5 2005 04 06 10 55 00 19.5300 -155.5600 3437.00 3397.00 40.00 197328 MLO 2005 04 06 19 56 00 3459-99 P co CCGG 162.930 -999.990 ... R5 2005 04 13 15 31 00 19.5300 -155.5600 3402.00 3397.00 5.00 197511 MLO 2005 04 06 19 56 00 3460-99 P co CCGG 164.130 -999.990 ... R5 2005 04 13 15 45 00 19.5300 -155.5600 3402.00 3397.00 5.00 197512 MLO 2005 04 06 20 20 00 2557-99 S co CCGG 155.420 -999.990 S.. R5 2005 04 13 15 03 00 19.5300 -155.5600 3437.00 3397.00 40.00 197509 MLO 2005 04 06 20 20 00 2558-99 S co CCGG 155.570 -999.990 S.. R5 2005 04 13 15 17 00 19.5300 -155.5600 3437.00 3397.00 40.00 197510 MLO 2005 04 13 19 57 00 469-99 P co CCGG 120.770 -999.990 P.. R5 2005 04 26 14 27 00 19.5300 -155.5600 3402.00 3397.00 5.00 197925 MLO 2005 04 13 19 57 00 470-99 P co CCGG 115.080 -999.990 P.. R5 2005 04 26 14 41 00 19.5300 -155.5600 3402.00 3397.00 5.00 197926 MLO 2005 04 13 20 16 00 665-99 S co CCGG 110.030 -999.990 S.. R5 2005 04 26 13 59 00 19.5300 -155.5600 3437.00 3397.00 40.00 197927 MLO 2005 04 13 20 16 00 666-99 S co CCGG 108.790 -999.990 S.. R5 2005 04 26 14 13 00 19.5300 -155.5600 3437.00 3397.00 40.00 197928 MLO 2005 04 19 19 38 00 1069-99 P co CCGG 142.510 -999.990 P.. R5 2005 04 26 14 56 00 19.5300 -155.5600 3402.00 3397.00 5.00 198049 MLO 2005 04 19 19 38 00 1070-99 P co CCGG 138.670 -999.990 P.. R5 2005 04 26 15 10 00 19.5300 -155.5600 3402.00 3397.00 5.00 198050 MLO 2005 04 19 20 17 00 799-99 S co CCGG 135.240 -999.990 S.. R5 2005 04 26 15 24 00 19.5300 -155.5600 3437.00 3397.00 40.00 198051 MLO 2005 04 19 20 17 00 800-99 S co CCGG 138.390 -999.990 S.. R5 2005 04 26 15 38 00 19.5300 -155.5600 3437.00 3397.00 40.00 198052 MLO 2005 04 27 20 12 00 867-99 P co CCGG 114.040 -999.990 ... R5 2005 05 05 11 09 00 19.5300 -155.5600 3402.00 3397.00 5.00 198521 MLO 2005 04 27 20 12 00 868-99 P co CCGG 111.230 -999.990 ... R5 2005 05 05 11 23 00 19.5300 -155.5600 3402.00 3397.00 5.00 198522 MLO 2005 04 27 20 22 00 3167-99 S co CCGG 112.090 -999.990 S.. R5 2005 05 05 10 41 00 19.5300 -155.5600 3437.00 3397.00 40.00 198519 MLO 2005 04 27 20 22 00 3168-99 S co CCGG 112.670 -999.990 S.. R5 2005 05 05 10 55 00 19.5300 -155.5600 3437.00 3397.00 40.00 198520 MLO 2005 05 04 20 10 00 2683-99 P co CCGG 96.940 -999.990 ... R5 2005 05 20 10 41 00 19.5300 -155.5600 3402.00 3397.00 5.00 198800 MLO 2005 05 04 20 10 00 2684-99 P co CCGG 95.180 -999.990 ... R5 2005 05 20 10 55 00 19.5300 -155.5600 3402.00 3397.00 5.00 198801 MLO 2005 05 04 20 24 00 2073-99 S co CCGG 89.440 -999.990 S.. R5 2005 05 20 11 09 00 19.5300 -155.5600 3437.00 3397.00 40.00 198798 MLO 2005 05 04 20 24 00 2074-99 S co CCGG 89.810 -999.990 S.. R5 2005 05 20 11 24 00 19.5300 -155.5600 3437.00 3397.00 40.00 198799 MLO 2005 05 11 19 56 00 3115-99 P co CCGG 108.260 -999.990 ... R5 2005 05 26 12 59 00 19.5300 -155.5600 3402.00 3397.00 5.00 199225 MLO 2005 05 11 19 56 00 3116-99 P co CCGG 105.680 -999.990 ... R5 2005 05 26 13 13 00 19.5300 -155.5600 3402.00 3397.00 5.00 199226 MLO 2005 05 11 20 16 00 945-99 S co CCGG 98.970 -999.990 S.. R5 2005 05 26 13 27 00 19.5300 -155.5600 3437.00 3397.00 40.00 199227 MLO 2005 05 11 20 16 00 946-99 S co CCGG 98.090 -999.990 S.. R5 2005 05 26 13 41 00 19.5300 -155.5600 3437.00 3397.00 40.00 199228 MLO 2005 05 18 20 05 00 167-99 D co CCGG 89.390 -999.990 ... R5 2005 06 17 14 29 00 19.5300 -155.5600 3402.00 3397.00 5.00 200117 MLO 2005 05 18 20 05 00 168-99 D co CCGG 88.740 -999.990 ... R5 2005 06 17 14 43 00 19.5300 -155.5600 3402.00 3397.00 5.00 200118 MLO 2005 05 18 20 05 00 1741-99 P co CCGG 96.490 -999.990 ... R5 2005 06 08 07 58 00 19.5300 -155.5600 3402.00 3397.00 5.00 199602 MLO 2005 05 18 20 05 00 1742-99 P co CCGG 95.240 -999.990 ... R5 2005 06 08 08 12 00 19.5300 -155.5600 3402.00 3397.00 5.00 199603 MLO 2005 05 18 20 17 00 1217-99 S co CCGG 88.940 -999.990 S.. R5 2005 06 08 08 27 00 19.5300 -155.5600 3437.00 3397.00 40.00 199600 MLO 2005 05 18 20 17 00 1218-99 S co CCGG 89.250 -999.990 S.. R5 2005 06 08 08 41 00 19.5300 -155.5600 3437.00 3397.00 40.00 199601 MLO 2005 05 25 19 55 00 2457-99 P co CCGG 108.350 -999.990 ... R5 2005 06 17 14 57 00 19.5300 -155.5600 3402.00 3397.00 5.00 200119 MLO 2005 05 25 19 55 00 2458-99 P co CCGG 105.010 -999.990 ... R5 2005 06 17 15 12 00 19.5300 -155.5600 3402.00 3397.00 5.00 200120 MLO 2005 05 25 20 17 00 3235-99 S co CCGG 102.750 -999.990 S.. R5 2005 06 21 09 08 00 19.5300 -155.5600 3437.00 3397.00 40.00 200349 MLO 2005 05 25 20 17 00 3236-99 S co CCGG 101.900 -999.990 S.. R5 2005 06 21 09 22 00 19.5300 -155.5600 3437.00 3397.00 40.00 200350 MLO 2005 06 01 20 09 00 2211-99 P co CCGG 113.040 -999.990 ... R5 2005 06 21 08 11 00 19.5300 -155.5600 3402.00 3397.00 5.00 200339 MLO 2005 06 01 20 09 00 2212-99 P co CCGG 112.160 -999.990 ... R5 2005 06 21 08 25 00 19.5300 -155.5600 3402.00 3397.00 5.00 200340 MLO 2005 06 01 20 09 00 3209-99 D co CCGG 100.980 -999.990 ... R5 2005 06 21 10 33 00 19.5300 -155.5600 3402.00 3397.00 5.00 200342 MLO 2005 06 01 20 09 00 3210-99 D co CCGG 101.300 -999.990 ... R5 2005 06 21 10 47 00 19.5300 -155.5600 3402.00 3397.00 5.00 200341 MLO 2005 06 01 20 20 00 6765-66 S co CCGG 100.420 -999.990 S.. R5 2005 06 21 08 39 00 19.5300 -155.5600 3437.00 3397.00 40.00 200347 MLO 2005 06 01 20 20 00 6766-66 S co CCGG 99.570 -999.990 S.. R5 2005 06 21 08 53 00 19.5300 -155.5600 3437.00 3397.00 40.00 200348 MLO 2005 06 08 19 56 00 3155-99 P co CCGG 90.370 -999.990 ... R5 2005 06 30 12 44 00 19.5300 -155.5600 3402.00 3397.00 5.00 200768 MLO 2005 06 08 19 56 00 3156-99 P co CCGG 87.770 -999.990 ... R5 2005 06 30 12 59 00 19.5300 -155.5600 3402.00 3397.00 5.00 200767 MLO 2005 06 08 20 14 00 6825-66 S co CCGG 82.510 -999.990 S.. R5 2005 06 30 12 16 00 19.5300 -155.5600 3437.00 3397.00 40.00 200765 MLO 2005 06 08 20 14 00 6826-66 S co CCGG 81.370 -999.990 S.. R5 2005 06 30 12 30 00 19.5300 -155.5600 3437.00 3397.00 40.00 200766 MLO 2005 06 15 20 06 00 669-99 P co CCGG 96.160 -999.990 ... R5 2005 07 15 08 05 00 19.5300 -155.5600 3402.00 3397.00 5.00 201301 MLO 2005 06 15 20 06 00 670-99 P co CCGG 93.670 -999.990 ... R5 2005 07 15 08 20 00 19.5300 -155.5600 3402.00 3397.00 5.00 201302 MLO 2005 06 15 20 11 00 1615-99 S co CCGG 85.020 -999.990 S.. R5 2005 07 15 08 34 00 19.5300 -155.5600 3437.00 3397.00 40.00 201299 MLO 2005 06 15 20 11 00 1616-99 S co CCGG 84.740 -999.990 S.. R5 2005 07 15 08 48 00 19.5300 -155.5600 3437.00 3397.00 40.00 201300 MLO 2005 06 22 19 57 00 205-99 P co CCGG 95.400 -999.990 ... R5 2005 07 18 15 57 00 19.5300 -155.5600 3402.00 3397.00 5.00 201634 MLO 2005 06 22 19 57 00 206-99 P co CCGG 93.490 -999.990 ... R5 2005 07 18 16 11 00 19.5300 -155.5600 3402.00 3397.00 5.00 201635 MLO 2005 06 22 20 15 00 3461-99 S co CCGG 88.370 -999.990 S.. R5 2005 07 18 15 28 00 19.5300 -155.5600 3437.00 3397.00 40.00 201636 MLO 2005 06 22 20 15 00 3462-99 S co CCGG 87.980 -999.990 S.. R5 2005 07 18 15 43 00 19.5300 -155.5600 3437.00 3397.00 40.00 201637 MLO 2005 06 29 20 01 00 1713-99 P co CCGG 84.370 -999.990 P.. R5 2005 07 22 12 34 00 19.5300 -155.5600 3402.00 3397.00 5.00 201955 MLO 2005 06 29 20 01 00 1714-99 P co CCGG 81.420 -999.990 P.. R5 2005 07 22 12 48 00 19.5300 -155.5600 3402.00 3397.00 5.00 201956 MLO 2005 06 29 20 14 00 6113-66 S co CCGG 74.440 -999.990 S.. R5 2005 07 22 13 02 00 19.5300 -155.5600 3437.00 3397.00 40.00 201957 MLO 2005 06 29 20 14 00 6114-66 S co CCGG 72.790 -999.990 S.. R5 2005 07 22 13 16 00 19.5300 -155.5600 3437.00 3397.00 40.00 201958 MLO 2005 07 06 19 58 00 4125-99 P co CCGG 91.540 -999.990 ... R5 2005 08 01 08 49 00 19.5300 -155.5600 3402.00 3397.00 5.00 202427 MLO 2005 07 06 19 58 00 4126-99 P co CCGG 89.920 -999.990 ... R5 2005 08 01 09 03 00 19.5300 -155.5600 3402.00 3397.00 5.00 202428 MLO 2005 07 06 20 04 00 4123-99 S co CCGG 83.630 -999.990 S.. R5 2005 07 29 15 04 00 19.5300 -155.5600 3437.00 3397.00 40.00 202425 MLO 2005 07 06 20 04 00 4124-99 S co CCGG 83.600 -999.990 S.. R5 2005 07 29 15 18 00 19.5300 -155.5600 3437.00 3397.00 40.00 202426 MLO 2005 07 13 19 58 00 3683-99 P co CCGG 82.170 -999.990 ... R5 2005 08 08 13 52 00 19.5300 -155.5600 3402.00 3397.00 5.00 202771 MLO 2005 07 13 19 58 00 3684-99 P co CCGG 80.470 -999.990 ... R5 2005 08 08 14 06 00 19.5300 -155.5600 3402.00 3397.00 5.00 202772 MLO 2005 07 13 20 06 00 2947-99 S co CCGG 74.300 -999.990 S.. R5 2005 08 08 13 24 00 19.5300 -155.5600 3437.00 3397.00 40.00 202769 MLO 2005 07 13 20 06 00 2948-99 S co CCGG 74.780 -999.990 S.. R5 2005 08 08 13 38 00 19.5300 -155.5600 3437.00 3397.00 40.00 202770 MLO 2005 07 20 19 41 00 3409-99 P co CCGG 82.820 -999.990 ... R5 2005 08 12 12 08 00 19.5300 -155.5600 3402.00 3397.00 5.00 203090 MLO 2005 07 20 19 41 00 3410-99 P co CCGG 80.360 -999.990 ... R5 2005 08 12 12 22 00 19.5300 -155.5600 3402.00 3397.00 5.00 203091 MLO 2005 07 20 20 00 00 1381-99 S co CCGG 69.950 -999.990 S.. R5 2005 08 12 12 37 00 19.5300 -155.5600 3437.00 3397.00 40.00 203088 MLO 2005 07 20 20 00 00 1382-99 S co CCGG 68.950 -999.990 S.. R5 2005 08 12 12 51 00 19.5300 -155.5600 3437.00 3397.00 40.00 203089 MLO 2005 07 26 19 42 00 261-99 P co CCGG 83.080 -999.990 ... R5 2005 08 17 09 58 00 19.5300 -155.5600 3402.00 3397.00 5.00 203372 MLO 2005 07 26 19 42 00 262-99 P co CCGG 81.930 -999.990 ... R5 2005 08 17 10 12 00 19.5300 -155.5600 3402.00 3397.00 5.00 203373 MLO 2005 07 26 20 02 00 3041-99 S co CCGG 73.510 -999.990 S.. R5 2005 08 17 10 26 00 19.5300 -155.5600 3437.00 3397.00 40.00 203374 MLO 2005 07 26 20 02 00 3042-99 S co CCGG 73.640 -999.990 S.. R5 2005 08 17 10 40 00 19.5300 -155.5600 3437.00 3397.00 40.00 203375 MLO 2005 08 03 20 05 00 2909-99 P co CCGG 70.680 -999.990 ... R5 2005 08 23 11 41 00 19.5300 -155.5600 3402.00 3397.00 5.00 203824 MLO 2005 08 03 20 05 00 2910-99 P co CCGG 68.140 -999.990 ... R5 2005 08 23 11 55 00 19.5300 -155.5600 3402.00 3397.00 5.00 203825 MLO 2005 08 03 20 25 00 2203-99 S co CCGG 61.800 -999.990 S.. R5 2005 08 23 12 09 00 19.5300 -155.5600 3437.00 3397.00 40.00 203822 MLO 2005 08 03 20 25 00 2204-99 S co CCGG 61.540 -999.990 S.. R5 2005 08 23 12 23 00 19.5300 -155.5600 3437.00 3397.00 40.00 203823 MLO 2005 08 10 20 06 00 3673-99 P co CCGG 71.630 -999.990 ... R5 2005 09 16 14 11 00 19.5300 -155.5600 3402.00 3397.00 5.00 205483 MLO 2005 08 10 20 06 00 3674-99 P co CCGG 70.460 -999.990 ... R5 2005 09 16 14 25 00 19.5300 -155.5600 3402.00 3397.00 5.00 205484 MLO 2005 08 10 20 14 00 1183-99 S co CCGG 68.570 -999.990 S.. R5 2005 09 16 13 42 00 19.5300 -155.5600 3437.00 3397.00 40.00 205481 MLO 2005 08 10 20 14 00 1184-99 S co CCGG 67.910 -999.990 S.. R5 2005 09 16 13 57 00 19.5300 -155.5600 3437.00 3397.00 40.00 205482 MLO 2005 08 16 19 48 00 26-99 P co CCGG 70.480 -999.990 ... R5 2005 09 07 14 56 00 19.5300 -155.5600 3402.00 3397.00 5.00 204557 MLO 2005 08 16 19 48 00 2857-99 P co CCGG 68.470 -999.990 ... R5 2005 09 07 15 10 00 19.5300 -155.5600 3402.00 3397.00 5.00 204558 MLO 2005 08 16 20 17 00 1127-99 S co CCGG 60.520 -999.990 S.. R5 2005 09 07 14 42 00 19.5300 -155.5600 3437.00 3397.00 40.00 204556 MLO 2005 08 16 20 17 00 96-99 S co CCGG 60.670 -999.990 S.. R5 2005 09 07 14 28 00 19.5300 -155.5600 3437.00 3397.00 40.00 204555 MLO 2005 08 24 19 57 00 1822-99 P co CCGG 82.440 -999.990 ... R5 2005 09 13 10 26 00 19.5300 -155.5600 3402.00 3397.00 5.00 204894 MLO 2005 08 24 19 57 00 2230-99 P co CCGG 80.540 -999.990 ... R5 2005 09 13 10 41 00 19.5300 -155.5600 3402.00 3397.00 5.00 204895 MLO 2005 08 24 20 05 00 1957-99 S co CCGG 75.230 -999.990 S.. R5 2005 09 13 09 58 00 19.5300 -155.5600 3437.00 3397.00 40.00 204892 MLO 2005 08 24 20 05 00 3060-99 S co CCGG 74.400 -999.990 S.. R5 2005 09 13 10 12 00 19.5300 -155.5600 3437.00 3397.00 40.00 204893 MLO 2005 08 31 20 03 00 1327-99 P co CCGG 77.740 -999.990 ... R5 2005 09 23 10 11 00 19.5300 -155.5600 3402.00 3397.00 5.00 205465 MLO 2005 08 31 20 03 00 1328-99 P co CCGG 75.940 -999.990 ... R5 2005 09 23 10 25 00 19.5300 -155.5600 3402.00 3397.00 5.00 205466 MLO 2005 08 31 20 11 00 6761-66 S co CCGG 69.970 -999.990 S.. R5 2005 09 23 10 40 00 19.5300 -155.5600 3437.00 3397.00 40.00 205463 MLO 2005 08 31 20 11 00 6762-66 S co CCGG 69.230 -999.990 S.. R5 2005 09 23 10 54 00 19.5300 -155.5600 3437.00 3397.00 40.00 205464 MLO 2005 09 07 20 02 00 4295-99 P co CCGG 72.300 -999.990 ... R5 2005 10 04 13 12 00 19.5300 -155.5600 3402.00 3397.00 5.00 206191 MLO 2005 09 07 20 02 00 4296-99 P co CCGG 69.800 -999.990 ... R5 2005 10 04 13 26 00 19.5300 -155.5600 3402.00 3397.00 5.00 206192 MLO 2005 09 07 20 11 00 1571-99 S co CCGG 64.840 -999.990 S.. R5 2005 10 04 12 43 00 19.5300 -155.5600 3437.00 3397.00 40.00 206189 MLO 2005 09 07 20 11 00 1572-99 S co CCGG 64.460 -999.990 S.. R5 2005 10 04 12 58 00 19.5300 -155.5600 3437.00 3397.00 40.00 206190 MLO 2005 09 14 19 59 00 3432-99 P co CCGG 79.050 -999.990 ... R5 2005 10 04 12 28 00 19.5300 -155.5600 3402.00 3397.00 5.00 206188 MLO 2005 09 14 19 59 00 792-99 P co CCGG 80.030 -999.990 ... R5 2005 10 04 12 14 00 19.5300 -155.5600 3402.00 3397.00 5.00 206187 MLO 2005 09 14 20 09 00 2445-99 S co CCGG 73.730 -999.990 S.. R5 2005 10 04 13 40 00 19.5300 -155.5600 3437.00 3397.00 40.00 206185 MLO 2005 09 14 20 09 00 3257-99 S co CCGG 73.800 -999.990 S.. R5 2005 10 04 13 55 00 19.5300 -155.5600 3437.00 3397.00 40.00 206186 MLO 2005 09 21 20 05 00 3599-99 P co CCGG 87.270 -999.990 ... R5 2005 10 07 09 17 00 19.5300 -155.5600 3402.00 3397.00 5.00 206408 MLO 2005 09 21 20 05 00 3600-99 P co CCGG 84.480 -999.990 ... R5 2005 10 07 09 31 00 19.5300 -155.5600 3402.00 3397.00 5.00 206409 MLO 2005 09 21 20 11 00 2895-99 S co CCGG 78.250 -999.990 S.. R5 2005 10 07 08 48 00 19.5300 -155.5600 3437.00 3397.00 40.00 206406 MLO 2005 09 21 20 11 00 2896-99 S co CCGG 79.750 -999.990 S.. R5 2005 10 07 09 02 00 19.5300 -155.5600 3437.00 3397.00 40.00 206407 MLO 2005 09 28 19 57 00 5198-99 P co CCGG 90.010 -999.990 P.. R5 2005 10 24 14 20 00 19.5300 -155.5600 3402.00 3397.00 5.00 206949 MLO 2005 09 28 19 57 00 98-99 P co CCGG 93.130 -999.990 P.. R5 2005 10 24 14 06 00 19.5300 -155.5600 3402.00 3397.00 5.00 206950 MLO 2005 09 28 20 05 00 204-99 S co CCGG 86.850 -999.990 S.. R5 2005 10 24 13 37 00 19.5300 -155.5600 3437.00 3397.00 40.00 206947 MLO 2005 09 28 20 05 00 2098-99 S co CCGG 86.430 -999.990 S.. R5 2005 10 24 13 52 00 19.5300 -155.5600 3437.00 3397.00 40.00 206948 MLO 2005 10 05 20 04 00 797-99 P co CCGG 95.090 -999.990 ... R5 2005 10 26 13 44 00 19.5300 -155.5600 3402.00 3397.00 5.00 207254 MLO 2005 10 05 20 04 00 798-99 P co CCGG 92.860 -999.990 ... R5 2005 10 26 13 58 00 19.5300 -155.5600 3402.00 3397.00 5.00 207255 MLO 2005 10 05 20 12 00 459-99 S co CCGG 87.060 -999.990 S.. R5 2005 10 26 13 15 00 19.5300 -155.5600 3437.00 3397.00 40.00 207252 MLO 2005 10 05 20 12 00 460-99 S co CCGG 88.560 -999.990 S.. R5 2005 10 26 13 30 00 19.5300 -155.5600 3437.00 3397.00 40.00 207253 MLO 2005 10 12 20 07 00 3809-99 P co CCGG 101.410 -999.990 ... R5 2005 11 01 11 30 00 19.5300 -155.5600 3402.00 3397.00 5.00 207424 MLO 2005 10 12 20 07 00 78-99 P co CCGG 103.540 -999.990 ... R5 2005 11 01 11 15 00 19.5300 -155.5600 3402.00 3397.00 5.00 207425 MLO 2005 10 12 20 21 00 1138-99 S co CCGG 95.670 -999.990 S.. R5 2005 11 01 11 44 00 19.5300 -155.5600 3437.00 3397.00 40.00 207422 MLO 2005 10 12 20 21 00 3506-99 S co CCGG 95.140 -999.990 S.. R5 2005 11 01 11 58 00 19.5300 -155.5600 3437.00 3397.00 40.00 207423 MLO 2005 10 19 20 10 00 2394-99 P co CCGG 93.070 -999.990 ... R5 2005 11 08 09 33 00 19.5300 -155.5600 3402.00 3397.00 5.00 207949 MLO 2005 10 19 20 10 00 318-99 P co CCGG 96.100 -999.990 ... R5 2005 11 08 09 19 00 19.5300 -155.5600 3402.00 3397.00 5.00 207950 MLO 2005 10 19 20 16 00 2478-99 S co CCGG 86.540 -999.990 S.. R5 2005 11 08 08 22 00 19.5300 -155.5600 3437.00 3397.00 40.00 207947 MLO 2005 10 19 20 16 00 3558-99 S co CCGG 86.220 -999.990 S.. R5 2005 11 08 08 36 00 19.5300 -155.5600 3437.00 3397.00 40.00 207948 MLO 2005 10 26 20 01 00 1966-99 P co CCGG 98.400 -999.990 ... R5 2005 11 09 15 29 00 19.5300 -155.5600 3402.00 3397.00 5.00 208249 MLO 2005 10 26 20 01 00 3957-99 P co CCGG 96.010 -999.990 ... R5 2005 11 09 15 44 00 19.5300 -155.5600 3402.00 3397.00 5.00 208250 MLO 2005 10 26 20 07 00 659-99 S co CCGG 90.590 -999.990 S.. R5 2005 11 09 15 58 00 19.5300 -155.5600 3437.00 3397.00 40.00 208247 MLO 2005 10 26 20 07 00 850-99 S co CCGG 90.530 -999.990 S.. R5 2005 11 09 16 12 00 19.5300 -155.5600 3437.00 3397.00 40.00 208248 MLO 2005 11 02 19 58 00 2939-99 P co CCGG 91.290 -999.990 ... R5 2005 11 10 11 51 00 19.5300 -155.5600 3402.00 3397.00 5.00 208766 MLO 2005 11 02 19 58 00 2940-99 P co CCGG 89.150 -999.990 ... R5 2005 11 10 12 05 00 19.5300 -155.5600 3402.00 3397.00 5.00 208767 MLO 2005 11 02 20 15 00 6089-66 S co CCGG 82.670 -999.990 S.. R5 2005 11 10 12 19 00 19.5300 -155.5600 3437.00 3397.00 40.00 208764 MLO 2005 11 02 20 15 00 6090-66 S co CCGG 84.040 -999.990 S.. R5 2005 11 10 12 33 00 19.5300 -155.5600 3437.00 3397.00 40.00 208765 MLO 2005 11 09 19 58 00 3755-99 P co CCGG 105.600 -999.990 P.. R5 2005 11 22 10 07 00 19.5300 -155.5600 3402.00 3397.00 5.00 209124 MLO 2005 11 09 19 58 00 3756-99 P co CCGG 102.160 -999.990 P.. R5 2005 11 22 10 22 00 19.5300 -155.5600 3402.00 3397.00 5.00 209125 MLO 2005 11 09 20 08 00 2005-99 S co CCGG 97.200 -999.990 S.. R5 2005 11 22 09 39 00 19.5300 -155.5600 3437.00 3397.00 40.00 209122 MLO 2005 11 09 20 08 00 2006-99 S co CCGG 97.930 -999.990 S.. R5 2005 11 22 09 53 00 19.5300 -155.5600 3437.00 3397.00 40.00 209123 MLO 2005 11 16 20 26 00 763-99 P co CCGG 128.580 -999.990 P.. R5 2005 12 02 10 48 00 19.5300 -155.5600 3402.00 3397.00 5.00 209365 MLO 2005 11 16 20 26 00 923-99 P co CCGG 124.380 -999.990 P.. R5 2005 12 02 11 02 00 19.5300 -155.5600 3402.00 3397.00 5.00 209366 MLO 2005 11 16 20 31 00 2372-99 S co CCGG 114.080 -999.990 S.. R5 2005 12 02 10 20 00 19.5300 -155.5600 3437.00 3397.00 40.00 209363 MLO 2005 11 16 20 31 00 3511-99 S co CCGG 110.790 -999.990 S.. R5 2005 12 02 10 34 00 19.5300 -155.5600 3437.00 3397.00 40.00 209364 MLO 2005 11 23 20 02 00 1015-99 P co CCGG 97.450 -999.990 ... R5 2005 12 06 12 25 00 19.5300 -155.5600 3402.00 3397.00 5.00 209692 MLO 2005 11 23 20 02 00 1016-99 P co CCGG 96.660 -999.990 ... R5 2005 12 06 12 39 00 19.5300 -155.5600 3402.00 3397.00 5.00 209693 MLO 2005 11 23 20 08 00 2035-99 S co CCGG 89.200 -999.990 S.. R5 2005 12 06 11 56 00 19.5300 -155.5600 3437.00 3397.00 40.00 209690 MLO 2005 11 23 20 08 00 2036-99 S co CCGG 89.010 -999.990 S.. R5 2005 12 06 12 10 00 19.5300 -155.5600 3437.00 3397.00 40.00 209691 MLO 2005 11 30 20 07 00 2233-99 P co CCGG 82.510 -999.990 ... R5 2005 12 09 10 18 00 19.5300 -155.5600 3402.00 3397.00 5.00 209878 MLO 2005 11 30 20 07 00 2234-99 P co CCGG 80.820 -999.990 ... R5 2005 12 09 10 32 00 19.5300 -155.5600 3402.00 3397.00 5.00 209879 MLO 2005 11 30 20 12 00 299-99 S co CCGG 76.510 -999.990 S.. R5 2005 12 09 09 21 00 19.5300 -155.5600 3437.00 3397.00 40.00 209876 MLO 2005 11 30 20 12 00 300-99 S co CCGG 77.890 -999.990 S.. R5 2005 12 09 09 35 00 19.5300 -155.5600 3437.00 3397.00 40.00 209877 MLO 2005 12 07 19 59 00 3531-99 P co CCGG 117.310 -999.990 ... R5 2005 12 15 08 48 00 19.5300 -155.5600 3402.00 3397.00 5.00 210346 MLO 2005 12 07 19 59 00 3532-99 P co CCGG 114.940 -999.990 ... R5 2005 12 15 09 03 00 19.5300 -155.5600 3402.00 3397.00 5.00 210347 MLO 2005 12 07 20 05 00 3601-99 S co CCGG 115.100 -999.990 S.. R5 2005 12 15 09 17 00 19.5300 -155.5600 3437.00 3397.00 40.00 210344 MLO 2005 12 07 20 05 00 3602-99 S co CCGG 113.650 -999.990 S.. R5 2005 12 15 09 31 00 19.5300 -155.5600 3437.00 3397.00 40.00 210345 MLO 2005 12 14 20 02 00 4017-99 P co CCGG 101.950 -999.990 ... R5 2005 12 22 16 28 00 19.5300 -155.5600 3402.00 3397.00 5.00 210642 MLO 2005 12 14 20 02 00 4018-99 P co CCGG 100.550 -999.990 ... R5 2005 12 22 16 42 00 19.5300 -155.5600 3402.00 3397.00 5.00 210643 MLO 2005 12 14 20 10 00 1951-99 S co CCGG 98.440 -999.990 S.. R5 2005 12 22 15 59 00 19.5300 -155.5600 3437.00 3397.00 40.00 210640 MLO 2005 12 14 20 10 00 1952-99 S co CCGG 97.680 -999.990 S.. R5 2005 12 22 16 13 00 19.5300 -155.5600 3437.00 3397.00 40.00 210641 MLO 2005 12 21 20 04 00 1691-99 P co CCGG 102.300 -999.990 ... R5 2006 01 18 10 37 00 19.5300 -155.5600 3402.00 3397.00 5.00 211239 MLO 2005 12 21 20 04 00 796-99 P co CCGG 104.300 -999.990 ... R5 2006 01 18 10 23 00 19.5300 -155.5600 3402.00 3397.00 5.00 211240 MLO 2005 12 21 20 14 00 2329-99 S co CCGG 94.930 -999.990 S.. R5 2006 01 18 10 51 00 19.5300 -155.5600 3437.00 3397.00 40.00 211237 MLO 2005 12 21 20 14 00 2723-99 S co CCGG 95.080 -999.990 S.. R5 2006 01 18 11 05 00 19.5300 -155.5600 3437.00 3397.00 40.00 211238 MLO 2005 12 28 20 05 00 321-99 P co CCGG 113.960 -999.990 P.. R5 2006 01 18 09 54 00 19.5300 -155.5600 3402.00 3397.00 5.00 211235 MLO 2005 12 28 20 05 00 322-99 P co CCGG 110.460 -999.990 P.. R5 2006 01 18 10 08 00 19.5300 -155.5600 3402.00 3397.00 5.00 211236 MLO 2005 12 28 20 15 00 6925-66 S co CCGG 104.040 -999.990 S.. R5 2006 01 18 09 26 00 19.5300 -155.5600 3437.00 3397.00 40.00 211233 MLO 2005 12 28 20 15 00 6926-66 S co CCGG 103.040 -999.990 S.. R5 2006 01 18 09 40 00 19.5300 -155.5600 3437.00 3397.00 40.00 211234 MLO 2006 01 04 20 01 00 1042-99 P co CCGG 101.310 -999.990 ... R5 2006 01 18 17 30 00 19.5300 -155.5600 3402.00 3397.00 5.00 211371 MLO 2006 01 04 20 01 00 2857-99 P co CCGG 99.390 -999.990 ... R5 2006 01 18 17 44 00 19.5300 -155.5600 3402.00 3397.00 5.00 211372 MLO 2006 01 04 20 09 00 1811-99 S co CCGG 94.180 -999.990 S.. R5 2006 01 18 17 02 00 19.5300 -155.5600 3437.00 3397.00 40.00 211369 MLO 2006 01 04 20 09 00 2576-99 S co CCGG 94.480 -999.990 S.. R5 2006 01 18 17 16 00 19.5300 -155.5600 3437.00 3397.00 40.00 211370 MLO 2006 01 11 20 04 00 1623-99 P co CCGG 116.890 -999.990 ..> R5 2006 01 30 13 32 00 19.5300 -155.5600 3402.00 3397.00 5.00 211807 MLO 2006 01 11 20 04 00 1624-99 P co CCGG 115.840 -999.990 ... R5 2006 01 30 13 46 00 19.5300 -155.5600 3402.00 3397.00 5.00 211808 MLO 2006 01 11 20 12 00 1225-99 S co CCGG 113.000 -999.990 S.. R5 2006 01 30 12 11 00 19.5300 -155.5600 3437.00 3397.00 40.00 211805 MLO 2006 01 11 20 12 00 1226-99 S co CCGG 112.850 -999.990 S.. R5 2006 01 30 12 25 00 19.5300 -155.5600 3437.00 3397.00 40.00 211806 MLO 2006 01 18 19 58 00 1003-99 P co CCGG 108.800 -999.990 ... R5 2006 02 02 13 54 00 19.5300 -155.5600 3402.00 3397.00 5.00 211914 MLO 2006 01 18 19 58 00 1004-99 P co CCGG 106.800 -999.990 ... R5 2006 02 02 14 09 00 19.5300 -155.5600 3402.00 3397.00 5.00 211915 MLO 2006 01 18 20 10 00 2057-99 S co CCGG 101.310 -999.990 S.. R5 2006 02 02 14 23 00 19.5300 -155.5600 3437.00 3397.00 40.00 211916 MLO 2006 01 18 20 10 00 2058-99 S co CCGG 100.290 -999.990 S.. R5 2006 02 02 14 37 00 19.5300 -155.5600 3437.00 3397.00 40.00 211917 MLO 2006 01 25 19 58 00 2767-99 P co CCGG 89.890 -999.990 ... R5 2006 02 09 12 38 00 19.5300 -155.5600 3402.00 3397.00 5.00 212306 MLO 2006 01 25 19 58 00 2768-99 P co CCGG 87.800 -999.990 ... R5 2006 02 09 12 53 00 19.5300 -155.5600 3402.00 3397.00 5.00 212307 MLO 2006 01 25 20 07 00 2817-99 S co CCGG 85.000 -999.990 S.. R5 2006 02 09 12 10 00 19.5300 -155.5600 3437.00 3397.00 40.00 212304 MLO 2006 01 25 20 07 00 2818-99 S co CCGG 84.580 -999.990 S.. R5 2006 02 09 12 24 00 19.5300 -155.5600 3437.00 3397.00 40.00 212305 MLO 2006 02 01 19 57 00 1751-99 P co CCGG 98.050 -999.990 ... R5 2006 02 15 10 33 00 19.5300 -155.5600 3402.00 3397.00 5.00 212487 MLO 2006 02 01 19 57 00 598-99 P co CCGG 100.540 -999.990 ... R5 2006 02 15 10 19 00 19.5300 -155.5600 3402.00 3397.00 5.00 212488 MLO 2006 02 01 20 09 00 204-99 S co CCGG 91.630 -999.990 S.. R5 2006 02 15 09 36 00 19.5300 -155.5600 3437.00 3397.00 40.00 212490 MLO 2006 02 01 20 09 00 6330-66 S co CCGG 91.200 -999.990 S.. R5 2006 02 15 09 22 00 19.5300 -155.5600 3437.00 3397.00 40.00 212489 MLO 2006 02 08 19 58 00 1711-99 P co CCGG 112.100 -999.990 ... R5 2006 02 17 14 28 00 19.5300 -155.5600 3402.00 3397.00 5.00 212855 MLO 2006 02 08 19 58 00 2230-99 P co CCGG 110.460 -999.990 ... R5 2006 02 17 14 42 00 19.5300 -155.5600 3402.00 3397.00 5.00 212856 MLO 2006 02 08 20 10 00 1241-99 S co CCGG 108.520 -999.990 S.. R5 2006 02 17 10 26 00 19.5300 -155.5600 3437.00 3397.00 40.00 212857 MLO 2006 02 08 20 10 00 6835-66 S co CCGG 105.600 -999.990 S.. R5 2006 02 17 10 12 00 19.5300 -155.5600 3437.00 3397.00 40.00 212858 MLO 2006 02 15 19 57 00 141-99 P co CCGG 116.680 -999.990 ... R5 2006 02 27 11 34 00 19.5300 -155.5600 3402.00 3397.00 5.00 213270 MLO 2006 02 15 19 57 00 3542-99 P co CCGG 115.360 -999.990 ... R5 2006 02 27 11 48 00 19.5300 -155.5600 3402.00 3397.00 5.00 213271 MLO 2006 02 15 20 05 00 1641-99 S co CCGG 110.980 -999.990 S.. R5 2006 02 27 11 20 00 19.5300 -155.5600 3437.00 3397.00 40.00 213269 MLO 2006 02 15 20 05 00 768-99 S co CCGG 110.760 -999.990 S.. R5 2006 02 27 11 05 00 19.5300 -155.5600 3437.00 3397.00 40.00 213268 MLO 2006 02 22 20 13 00 1501-99 P co CCGG 91.800 -999.990 ... R5 2006 03 07 14 07 00 19.5300 -155.5600 3402.00 3397.00 5.00 213427 MLO 2006 02 22 20 13 00 2300-99 P co CCGG 90.920 -999.990 ... R5 2006 03 07 14 22 00 19.5300 -155.5600 3402.00 3397.00 5.00 213428 MLO 2006 02 22 20 22 00 3614-99 S co CCGG 86.670 -999.990 S.. R5 2006 03 07 14 50 00 19.5300 -155.5600 3437.00 3397.00 40.00 213429 MLO 2006 02 22 20 22 00 659-99 S co CCGG 87.060 -999.990 S.. R5 2006 03 07 14 36 00 19.5300 -155.5600 3437.00 3397.00 40.00 213430 MLO 2006 03 01 20 06 00 4547-99 P co CCGG 77.130 -999.990 ... R5 2006 03 10 13 39 00 19.5300 -155.5600 3402.00 3397.00 5.00 213685 MLO 2006 03 01 20 06 00 4548-99 P co CCGG 76.280 -999.990 ... R5 2006 03 10 13 54 00 19.5300 -155.5600 3402.00 3397.00 5.00 213686 MLO 2006 03 01 20 12 00 4557-99 S co CCGG 81.710 -999.990 S.. R5 2006 03 15 10 23 00 19.5300 -155.5600 3437.00 3397.00 40.00 213687 MLO 2006 03 08 20 16 00 3527-99 P co CCGG 114.340 -999.990 ... R5 2006 03 17 08 47 00 19.5300 -155.5600 3402.00 3397.00 5.00 214051 MLO 2006 03 08 20 16 00 5198-99 P co CCGG 111.710 -999.990 ... R5 2006 03 17 09 01 00 19.5300 -155.5600 3402.00 3397.00 5.00 214052 MLO 2006 03 08 20 24 00 265-99 S co CCGG 100.890 -999.990 S.. R5 2006 03 17 09 15 00 19.5300 -155.5600 3437.00 3397.00 40.00 214053 MLO 2006 03 08 20 24 00 376-99 S co CCGG 100.770 -999.990 S.. R5 2006 03 17 09 30 00 19.5300 -155.5600 3437.00 3397.00 40.00 214054 MLO 2006 03 15 20 06 00 4630-99 P co CCGG 96.370 -999.990 ... R5 2006 03 20 16 29 00 19.5300 -155.5600 3402.00 3397.00 5.00 214106 MLO 2006 03 15 20 06 00 4631-99 P co CCGG 97.750 -999.990 ... R5 2006 03 20 16 43 00 19.5300 -155.5600 3402.00 3397.00 5.00 214107 MLO 2006 03 15 20 12 00 4629-99 S co CCGG 95.710 -999.990 S.. R5 2006 03 20 16 00 00 19.5300 -155.5600 3437.00 3397.00 40.00 214104 MLO 2006 03 15 20 12 00 4632-99 S co CCGG 95.690 -999.990 S.. R5 2006 03 20 16 14 00 19.5300 -155.5600 3437.00 3397.00 40.00 214105 MLO 2006 03 22 20 06 00 277-99 P co CCGG 107.330 -999.990 P.. R5 2006 03 30 10 40 00 19.5300 -155.5600 3402.00 3397.00 5.00 214442 MLO 2006 03 22 20 06 00 278-99 P co CCGG 102.730 -999.990 P.. R5 2006 03 30 10 54 00 19.5300 -155.5600 3402.00 3397.00 5.00 214443 MLO 2006 03 22 20 16 00 4149-99 S co CCGG 101.860 -999.990 S.. R5 2006 03 30 11 09 00 19.5300 -155.5600 3437.00 3397.00 40.00 214440 MLO 2006 03 22 20 16 00 4150-99 S co CCGG 101.570 -999.990 S.. R5 2006 03 30 11 23 00 19.5300 -155.5600 3437.00 3397.00 40.00 214441 MLO 2006 03 29 20 02 00 3426-99 P co CCGG 84.640 -999.990 ... R5 2006 04 05 10 13 00 19.5300 -155.5600 3402.00 3397.00 5.00 214818 MLO 2006 03 29 20 02 00 616-99 P co CCGG 84.830 -999.990 ... R5 2006 04 05 09 59 00 19.5300 -155.5600 3402.00 3397.00 5.00 214817 MLO 2006 03 29 20 10 00 2065-99 S co CCGG 88.070 -999.990 S.. R5 2006 04 05 10 42 00 19.5300 -155.5600 3437.00 3397.00 40.00 214820 MLO 2006 03 29 20 10 00 6547-66 S co CCGG 87.360 -999.990 S.. R5 2006 04 05 10 27 00 19.5300 -155.5600 3437.00 3397.00 40.00 214819 MLO 2006 04 05 19 58 00 210-99 P co CCGG 120.540 -999.990 ... R5 2006 04 12 09 13 00 19.5300 -155.5600 3402.00 3397.00 5.00 215175 MLO 2006 04 05 19 58 00 2329-99 P co CCGG 120.040 -999.990 ... R5 2006 04 12 09 27 00 19.5300 -155.5600 3402.00 3397.00 5.00 215176 MLO 2006 04 05 20 05 00 2576-99 S co CCGG 119.830 -999.990 S.. R5 2006 04 12 09 41 00 19.5300 -155.5600 3437.00 3397.00 40.00 215178 MLO 2006 04 05 20 05 00 6330-66 S co CCGG 119.330 -999.990 S.. R5 2006 04 12 09 55 00 19.5300 -155.5600 3437.00 3397.00 40.00 215177 MLO 2006 04 12 19 57 00 2473-99 P co CCGG 143.180 -999.990 ... R5 2006 04 19 14 31 00 19.5300 -155.5600 3402.00 3397.00 5.00 215515 MLO 2006 04 12 19 57 00 2474-99 P co CCGG 143.260 -999.990 ... R5 2006 04 19 14 46 00 19.5300 -155.5600 3402.00 3397.00 5.00 215516 MLO 2006 04 12 20 06 00 6037-66 S co CCGG 142.500 -999.990 S.. R5 2006 04 19 13 34 00 19.5300 -155.5600 3437.00 3397.00 40.00 215517 MLO 2006 04 12 20 06 00 6038-66 S co CCGG 141.930 -999.990 S.. R5 2006 04 19 13 49 00 19.5300 -155.5600 3437.00 3397.00 40.00 215518 MLO 2006 04 19 20 02 00 1049-99 P co CCGG 137.350 -999.990 ... R5 2006 05 03 12 26 00 19.5300 -155.5600 3402.00 3397.00 5.00 216074 MLO 2006 04 19 20 02 00 1050-99 P co CCGG 137.970 -999.990 ... R5 2006 05 03 12 41 00 19.5300 -155.5600 3402.00 3397.00 5.00 216075 MLO 2006 04 19 20 08 00 6071-66 S co CCGG 139.700 -999.990 S.. R5 2006 05 03 11 58 00 19.5300 -155.5600 3437.00 3397.00 40.00 216076 MLO 2006 04 19 20 08 00 6072-66 S co CCGG 138.630 -999.990 S.. R5 2006 05 03 12 12 00 19.5300 -155.5600 3437.00 3397.00 40.00 216077 MLO 2006 04 26 20 01 00 527-99 P co CCGG 114.400 -999.990 ... R5 2006 05 15 14 56 00 19.5300 -155.5600 3402.00 3397.00 5.00 216365 MLO 2006 04 26 20 01 00 528-99 P co CCGG 114.130 -999.990 ... R5 2006 05 15 15 11 00 19.5300 -155.5600 3402.00 3397.00 5.00 216366 MLO 2006 04 26 20 13 00 2407-99 S co CCGG 113.790 -999.990 S.. R5 2006 05 15 14 28 00 19.5300 -155.5600 3437.00 3397.00 40.00 216367 MLO 2006 04 26 20 13 00 2408-99 S co CCGG 113.690 -999.990 S.. R5 2006 05 15 14 42 00 19.5300 -155.5600 3437.00 3397.00 40.00 216368 MLO 2006 05 03 20 07 00 3179-99 P co CCGG 121.500 -999.990 ... R5 2006 05 19 12 06 00 19.5300 -155.5600 3402.00 3397.00 5.00 216658 MLO 2006 05 03 20 07 00 3180-99 P co CCGG 121.780 -999.990 ... R5 2006 05 19 12 20 00 19.5300 -155.5600 3402.00 3397.00 5.00 216659 MLO 2006 05 03 20 30 00 3899-99 S co CCGG 124.200 -999.990 S.. R5 2006 05 19 11 37 00 19.5300 -155.5600 3437.00 3397.00 40.00 216656 MLO 2006 05 03 20 30 00 3900-99 S co CCGG 121.020 -999.990 S.. R5 2006 05 19 11 51 00 19.5300 -155.5600 3437.00 3397.00 40.00 216657 MLO 2006 05 10 20 00 00 1357-99 P co CCGG 108.710 -999.990 ... R5 2006 05 25 13 53 00 19.5300 -155.5600 3402.00 3397.00 5.00 216940 MLO 2006 05 10 20 00 00 1358-99 P co CCGG 108.600 -999.990 ... R5 2006 05 25 14 07 00 19.5300 -155.5600 3402.00 3397.00 5.00 216941 MLO 2006 05 10 20 07 00 2795-99 S co CCGG 109.520 -999.990 S.. R5 2006 05 25 13 24 00 19.5300 -155.5600 3437.00 3397.00 40.00 216938 MLO 2006 05 10 20 07 00 2796-99 S co CCGG 108.960 -999.990 S.. R5 2006 05 25 13 39 00 19.5300 -155.5600 3437.00 3397.00 40.00 216939 MLO 2006 05 17 19 57 00 317-99 P co CCGG 100.800 -999.990 ... R5 2006 06 02 12 08 00 19.5300 -155.5600 3402.00 3397.00 5.00 217289 MLO 2006 05 17 19 57 00 318-99 P co CCGG 100.440 -999.990 ... R5 2006 06 02 12 22 00 19.5300 -155.5600 3402.00 3397.00 5.00 217290 MLO 2006 05 17 20 11 00 4165-99 S co CCGG 101.790 -999.990 S.. R5 2006 06 02 13 05 00 19.5300 -155.5600 3437.00 3397.00 40.00 217291 MLO 2006 05 17 20 11 00 4166-99 S co CCGG 100.450 -999.990 S.. R5 2006 06 02 13 19 00 19.5300 -155.5600 3437.00 3397.00 40.00 217292 MLO 2006 05 24 20 12 00 763-99 P co CCGG 107.210 -999.990 ... R5 2006 06 09 15 03 00 19.5300 -155.5600 3402.00 3397.00 5.00 217569 MLO 2006 05 24 20 12 00 764-99 P co CCGG 107.610 -999.990 ... R5 2006 06 09 15 18 00 19.5300 -155.5600 3402.00 3397.00 5.00 217570 MLO 2006 05 24 20 21 00 1305-99 S co CCGG 106.190 -999.990 S.. R5 2006 06 09 14 35 00 19.5300 -155.5600 3437.00 3397.00 40.00 217571 MLO 2006 05 24 20 21 00 1306-99 S co CCGG 106.130 -999.990 S.. R5 2006 06 09 14 49 00 19.5300 -155.5600 3437.00 3397.00 40.00 217572 MLO 2006 05 31 19 42 00 3297-99 P co CCGG 87.560 -999.990 ... R5 2006 06 23 14 41 00 19.5300 -155.5600 3402.00 3397.00 5.00 218060 MLO 2006 05 31 19 42 00 3298-99 P co CCGG 88.350 -999.990 ... R5 2006 06 23 14 55 00 19.5300 -155.5600 3402.00 3397.00 5.00 218061 MLO 2006 05 31 20 14 00 2987-99 S co CCGG 88.630 -999.990 S.. R5 2006 06 23 13 15 00 19.5300 -155.5600 3437.00 3397.00 40.00 218058 MLO 2006 05 31 20 14 00 2988-99 S co CCGG 87.500 -999.990 S.. R5 2006 06 23 13 30 00 19.5300 -155.5600 3437.00 3397.00 40.00 218059 MLO 2006 06 07 19 57 00 3493-99 P co CCGG 79.280 -999.990 ... R5 2006 06 28 15 47 00 19.5300 -155.5600 3402.00 3397.00 5.00 218254 MLO 2006 06 07 19 57 00 3494-99 P co CCGG 78.400 -999.990 ... R5 2006 06 28 16 02 00 19.5300 -155.5600 3402.00 3397.00 5.00 218255 MLO 2006 06 07 20 05 00 89-99 S co CCGG 78.460 -999.990 S.. R5 2006 06 28 15 19 00 19.5300 -155.5600 3437.00 3397.00 40.00 218256 MLO 2006 06 07 20 05 00 90-99 S co CCGG 77.190 -999.990 S.. R5 2006 06 28 15 33 00 19.5300 -155.5600 3437.00 3397.00 40.00 218257 MLO 2006 06 14 20 07 00 2989-99 P co CCGG 89.550 -999.990 ... R5 2006 07 10 14 29 00 19.5300 -155.5600 3402.00 3397.00 5.00 218585 MLO 2006 06 14 20 07 00 2990-99 P co CCGG 91.580 -999.990 ... R5 2006 07 10 14 43 00 19.5300 -155.5600 3402.00 3397.00 5.00 218586 MLO 2006 06 14 20 17 00 3797-99 S co CCGG 91.000 -999.990 S.. R5 2006 07 10 14 57 00 19.5300 -155.5600 3437.00 3397.00 40.00 218583 MLO 2006 06 14 20 17 00 3798-99 S co CCGG 91.280 -999.990 S.. R5 2006 07 10 15 11 00 19.5300 -155.5600 3437.00 3397.00 40.00 218584 MLO 2006 06 21 20 16 00 261-99 P co CCGG 79.200 -999.990 ... R5 2006 07 14 10 21 00 19.5300 -155.5600 3402.00 3397.00 5.00 218833 MLO 2006 06 21 20 16 00 262-99 P co CCGG 80.940 -999.990 ... R5 2006 07 14 10 35 00 19.5300 -155.5600 3402.00 3397.00 5.00 218834 MLO 2006 06 21 20 22 00 1811-99 S co CCGG 79.700 -999.990 S.. R5 2006 07 14 09 52 00 19.5300 -155.5600 3437.00 3397.00 40.00 218831 MLO 2006 06 21 20 22 00 1812-99 S co CCGG 78.740 -999.990 S.. R5 2006 07 14 10 07 00 19.5300 -155.5600 3437.00 3397.00 40.00 218832 MLO 2006 06 29 19 47 00 3165-99 P co CCGG 67.590 -999.990 ... R5 2006 07 20 09 51 00 19.5300 -155.5600 3402.00 3397.00 5.00 219159 MLO 2006 06 29 19 47 00 3166-99 P co CCGG 67.990 -999.990 ... R5 2006 07 20 10 06 00 19.5300 -155.5600 3402.00 3397.00 5.00 219160 MLO 2006 06 29 20 09 00 4029-99 S co CCGG 68.690 -999.990 S.. R5 2006 07 20 10 20 00 19.5300 -155.5600 3437.00 3397.00 40.00 219161 MLO 2006 06 29 20 09 00 4030-99 S co CCGG 67.940 -999.990 S.. R5 2006 07 20 10 34 00 19.5300 -155.5600 3437.00 3397.00 40.00 219162 MLO 2006 07 05 20 18 00 635-99 P co CCGG 71.570 -999.990 ... R5 2006 07 19 15 18 00 19.5300 -155.5600 3402.00 3397.00 5.00 219157 MLO 2006 07 05 20 18 00 636-99 P co CCGG 71.680 -999.990 ... R5 2006 07 19 15 32 00 19.5300 -155.5600 3402.00 3397.00 5.00 219158 MLO 2006 07 05 20 25 00 2573-99 S co CCGG 69.930 -999.990 S.. R5 2006 07 20 09 23 00 19.5300 -155.5600 3437.00 3397.00 40.00 219155 MLO 2006 07 05 20 25 00 2574-99 S co CCGG 69.660 -999.990 S.. R5 2006 07 20 09 37 00 19.5300 -155.5600 3437.00 3397.00 40.00 219156 MLO 2006 07 12 20 01 00 675-99 P co CCGG 76.180 -999.990 ... R5 2006 07 27 11 45 00 19.5300 -155.5600 3402.00 3397.00 5.00 219691 MLO 2006 07 12 20 01 00 676-99 P co CCGG 75.910 -999.990 ... R5 2006 07 27 12 00 00 19.5300 -155.5600 3402.00 3397.00 5.00 219692 MLO 2006 07 12 20 16 00 3301-99 S co CCGG 75.470 -999.990 S.. R5 2006 07 27 11 17 00 19.5300 -155.5600 3437.00 3397.00 40.00 219689 MLO 2006 07 12 20 16 00 3302-99 S co CCGG 76.200 -999.990 S.. R5 2006 07 27 11 31 00 19.5300 -155.5600 3437.00 3397.00 40.00 219690 MLO 2006 07 19 19 55 00 2099-99 P co CCGG 66.840 -999.990 ... R5 2006 08 09 11 26 00 19.5300 -155.5600 3402.00 3397.00 5.00 220111 MLO 2006 07 19 19 55 00 2100-99 P co CCGG 67.310 -999.990 ... R5 2006 08 09 11 41 00 19.5300 -155.5600 3402.00 3397.00 5.00 220112 MLO 2006 07 19 20 19 00 4635-99 S co CCGG 66.380 -999.990 S.. R5 2006 08 09 10 58 00 19.5300 -155.5600 3437.00 3397.00 40.00 220109 MLO 2006 07 19 20 19 00 4636-99 S co CCGG 66.500 -999.990 S.. R5 2006 08 09 11 12 00 19.5300 -155.5600 3437.00 3397.00 40.00 220110 MLO 2006 07 26 19 50 00 77-99 P co CCGG 62.460 -999.990 ... R5 2006 08 14 08 49 00 19.5300 -155.5600 3402.00 3397.00 5.00 220320 MLO 2006 07 26 19 50 00 78-99 P co CCGG 61.560 -999.990 ... R5 2006 08 14 09 04 00 19.5300 -155.5600 3402.00 3397.00 5.00 220321 MLO 2006 07 26 20 13 00 2105-99 S co CCGG 61.370 -999.990 S.. R5 2006 08 14 09 18 00 19.5300 -155.5600 3437.00 3397.00 40.00 220322 MLO 2006 07 26 20 13 00 2106-99 S co CCGG 61.140 -999.990 S.. R5 2006 08 14 09 32 00 19.5300 -155.5600 3437.00 3397.00 40.00 220323 MLO 2006 08 02 20 17 00 1001-99 P co CCGG 60.080 -999.990 ... R5 2006 08 18 13 17 00 19.5300 -155.5600 3402.00 3397.00 5.00 220677 MLO 2006 08 02 20 17 00 1002-99 P co CCGG 59.400 -999.990 ... R5 2006 08 18 13 31 00 19.5300 -155.5600 3402.00 3397.00 5.00 220678 MLO 2006 08 02 20 23 00 3415-99 S co CCGG 59.210 -999.990 S.. R5 2006 08 18 12 48 00 19.5300 -155.5600 3437.00 3397.00 40.00 220675 MLO 2006 08 02 20 23 00 3416-99 S co CCGG 59.860 -999.990 S.. R5 2006 08 18 13 02 00 19.5300 -155.5600 3437.00 3397.00 40.00 220676 MLO 2006 08 09 20 02 00 3805-99 P co CCGG 65.010 -999.990 ... R5 2006 08 17 13 10 00 19.5300 -155.5600 3402.00 3397.00 5.00 220917 MLO 2006 08 09 20 02 00 3806-99 P co CCGG 65.220 -999.990 ... R5 2006 08 17 13 24 00 19.5300 -155.5600 3402.00 3397.00 5.00 220918 MLO 2006 08 09 20 15 00 3849-99 S co CCGG 65.680 -999.990 S.. R5 2006 08 17 14 07 00 19.5300 -155.5600 3437.00 3397.00 40.00 220919 MLO 2006 08 09 20 15 00 3850-99 S co CCGG 66.400 -999.990 S.. R5 2006 08 17 14 21 00 19.5300 -155.5600 3437.00 3397.00 40.00 220920 MLO 2006 08 16 20 04 00 1515-99 P co CCGG 64.780 -999.990 ... R5 2006 08 30 11 39 00 19.5300 -155.5600 3402.00 3397.00 5.00 221252 MLO 2006 08 16 20 04 00 1516-99 P co CCGG 64.900 -999.990 ... R5 2006 08 30 11 54 00 19.5300 -155.5600 3402.00 3397.00 5.00 221253 MLO 2006 08 16 20 15 00 6113-66 S co CCGG 65.120 -999.990 S.. R5 2006 08 30 11 11 00 19.5300 -155.5600 3437.00 3397.00 40.00 221250 MLO 2006 08 16 20 15 00 6114-66 S co CCGG 63.980 -999.990 S.. R5 2006 08 30 11 25 00 19.5300 -155.5600 3437.00 3397.00 40.00 221251 MLO 2006 08 23 20 05 00 205-99 P co CCGG 67.100 -999.990 ... R5 2006 09 06 08 51 00 19.5300 -155.5600 3402.00 3397.00 5.00 221598 MLO 2006 08 23 20 05 00 206-99 P co CCGG 66.560 -999.990 ... R5 2006 09 06 09 05 00 19.5300 -155.5600 3402.00 3397.00 5.00 221599 MLO 2006 08 23 20 14 00 6185-66 S co CCGG 65.120 -999.990 S.. R5 2006 09 05 15 07 00 19.5300 -155.5600 3437.00 3397.00 40.00 221596 MLO 2006 08 23 20 14 00 6186-66 S co CCGG 65.520 -999.990 S.. R5 2006 09 05 15 21 00 19.5300 -155.5600 3437.00 3397.00 40.00 221597 MLO 2006 08 30 20 02 00 1389-99 P co CCGG 61.420 -999.990 ... R5 2006 09 12 13 11 00 19.5300 -155.5600 3402.00 3397.00 5.00 222067 MLO 2006 08 30 20 02 00 1390-99 P co CCGG 61.970 -999.990 ... R5 2006 09 12 13 26 00 19.5300 -155.5600 3402.00 3397.00 5.00 222068 MLO 2006 08 30 20 10 00 6509-66 S co CCGG 60.700 -999.990 S.. R5 2006 09 12 13 40 00 19.5300 -155.5600 3437.00 3397.00 40.00 222069 MLO 2006 08 30 20 10 00 6510-66 S co CCGG 59.960 -999.990 S.. R5 2006 09 12 13 54 00 19.5300 -155.5600 3437.00 3397.00 40.00 222070 MLO 2006 09 06 20 06 00 6129-66 P co CCGG 69.750 -999.990 ... R5 2006 09 20 15 19 00 19.5300 -155.5600 3402.00 3397.00 5.00 222322 MLO 2006 09 06 20 06 00 6130-66 P co CCGG 69.520 -999.990 ... R5 2006 09 20 15 33 00 19.5300 -155.5600 3402.00 3397.00 5.00 222323 MLO 2006 09 06 20 13 00 6421-66 S co CCGG 69.490 -999.990 S.. R5 2006 09 20 14 50 00 19.5300 -155.5600 3437.00 3397.00 40.00 222324 MLO 2006 09 06 20 13 00 6422-66 S co CCGG 68.850 -999.990 S.. R5 2006 09 20 15 05 00 19.5300 -155.5600 3437.00 3397.00 40.00 222325 MLO 2006 09 13 20 08 00 3235-99 P co CCGG 64.510 -999.990 ... R5 2006 10 03 14 32 00 19.5300 -155.5600 3402.00 3397.00 5.00 222785 MLO 2006 09 13 20 08 00 3236-99 P co CCGG 63.480 -999.990 ... R5 2006 10 03 14 46 00 19.5300 -155.5600 3402.00 3397.00 5.00 222786 MLO 2006 09 13 20 13 00 49-99 S co CCGG 62.660 -999.990 S.. R5 2006 10 03 14 03 00 19.5300 -155.5600 3437.00 3397.00 40.00 222787 MLO 2006 09 13 20 13 00 50-99 S co CCGG 62.860 -999.990 S.. R5 2006 10 03 14 18 00 19.5300 -155.5600 3437.00 3397.00 40.00 222788 MLO 2006 09 20 20 07 00 12-99 P co CCGG 74.510 -999.990 ... R5 2006 10 06 12 03 00 19.5300 -155.5600 3402.00 3397.00 5.00 222963 MLO 2006 09 20 20 07 00 65-99 P co CCGG 75.750 -999.990 ... R5 2006 10 06 12 17 00 19.5300 -155.5600 3402.00 3397.00 5.00 222964 MLO 2006 09 20 20 19 00 2857-99 S co CCGG 73.870 -999.990 S.. R5 2006 10 06 12 31 00 19.5300 -155.5600 3437.00 3397.00 40.00 222961 MLO 2006 09 20 20 19 00 6547-66 S co CCGG 73.620 -999.990 S.. R5 2006 10 06 12 45 00 19.5300 -155.5600 3437.00 3397.00 40.00 222962 MLO 2006 09 27 20 39 00 2907-99 P co CCGG 69.690 -999.990 ... R5 2006 10 10 10 41 00 19.5300 -155.5600 3402.00 3397.00 5.00 223359 MLO 2006 09 27 20 39 00 4623-99 P co CCGG 68.370 -999.990 ... R5 2006 10 10 10 56 00 19.5300 -155.5600 3402.00 3397.00 5.00 223360 MLO 2006 09 27 20 59 00 2981-99 S co CCGG 69.370 -999.990 S.. R5 2006 10 10 10 13 00 19.5300 -155.5600 3437.00 3397.00 40.00 223357 MLO 2006 09 27 20 59 00 2982-99 S co CCGG 69.620 -999.990 S.. R5 2006 10 10 10 27 00 19.5300 -155.5600 3437.00 3397.00 40.00 223358 MLO 2006 10 04 19 52 00 2256-99 S co CCGG 68.260 -999.990 S.. R5 2006 10 19 12 52 00 19.5300 -155.5600 3437.00 3397.00 40.00 223679 MLO 2006 10 04 19 52 00 708-99 S co CCGG 67.950 -999.990 S.. R5 2006 10 19 12 37 00 19.5300 -155.5600 3437.00 3397.00 40.00 223678 MLO 2006 10 04 20 09 00 1598-99 P co CCGG 67.110 -999.990 ... R5 2006 10 19 13 06 00 19.5300 -155.5600 3402.00 3397.00 5.00 223676 MLO 2006 10 04 20 09 00 4121-99 P co CCGG 67.100 -999.990 ... R5 2006 10 19 13 20 00 19.5300 -155.5600 3402.00 3397.00 5.00 223677 MLO 2006 10 11 20 06 00 3705-99 P co CCGG 80.840 -999.990 ... R5 2006 10 26 10 21 00 19.5300 -155.5600 3402.00 3397.00 5.00 223914 MLO 2006 10 11 20 06 00 3706-99 P co CCGG 80.790 -999.990 ... R5 2006 10 26 10 36 00 19.5300 -155.5600 3402.00 3397.00 5.00 223915 MLO 2006 10 11 20 14 00 6427-66 S co CCGG 79.520 -999.990 S.. R5 2006 10 26 10 50 00 19.5300 -155.5600 3437.00 3397.00 40.00 223916 MLO 2006 10 11 20 14 00 6428-66 S co CCGG 79.640 -999.990 S.. R5 2006 10 26 11 04 00 19.5300 -155.5600 3437.00 3397.00 40.00 223917 MLO 2006 10 18 20 25 00 3581-99 P co CCGG 94.130 -999.990 ... R5 2006 11 06 09 21 00 19.5300 -155.5600 3402.00 3397.00 5.00 224382 MLO 2006 10 18 20 25 00 3582-99 P co CCGG 88.180 -999.990 ... R5 2006 11 06 09 35 00 19.5300 -155.5600 3402.00 3397.00 5.00 224383 MLO 2006 10 18 20 30 00 6215-66 S co CCGG 84.640 -999.990 S.. R5 2006 11 06 08 53 00 19.5300 -155.5600 3437.00 3397.00 40.00 224380 MLO 2006 10 18 20 30 00 6216-66 S co CCGG 86.470 -999.990 S.. R5 2006 11 06 09 07 00 19.5300 -155.5600 3437.00 3397.00 40.00 224381 MLO 2006 10 25 20 13 00 1989-99 P co CCGG 94.340 -999.990 ... R5 2006 11 09 13 06 00 19.5300 -155.5600 3402.00 3397.00 5.00 224726 MLO 2006 10 25 20 13 00 1990-99 P co CCGG 93.790 -999.990 ... R5 2006 11 09 13 21 00 19.5300 -155.5600 3402.00 3397.00 5.00 224727 MLO 2006 10 25 20 19 00 6261-66 S co CCGG 90.260 -999.990 S.. R5 2006 11 09 13 35 00 19.5300 -155.5600 3437.00 3397.00 40.00 224728 MLO 2006 10 25 20 19 00 6262-66 S co CCGG 91.270 -999.990 S.. R5 2006 11 09 13 49 00 19.5300 -155.5600 3437.00 3397.00 40.00 224729 MLO 2006 11 01 19 59 00 3687-99 P co CCGG 84.680 -999.990 ... R5 2006 11 13 10 45 00 19.5300 -155.5600 3402.00 3397.00 5.00 224931 MLO 2006 11 01 19 59 00 3688-99 P co CCGG 84.550 -999.990 ... R5 2006 11 13 11 00 00 19.5300 -155.5600 3402.00 3397.00 5.00 224932 MLO 2006 11 01 20 11 00 1707-99 S co CCGG 84.440 -999.990 S.. R5 2006 11 13 11 14 00 19.5300 -155.5600 3437.00 3397.00 40.00 224933 MLO 2006 11 01 20 11 00 1708-99 S co CCGG 84.040 -999.990 S.. R5 2006 11 13 11 28 00 19.5300 -155.5600 3437.00 3397.00 40.00 224934 MLO 2006 11 08 20 10 00 3425-99 P co CCGG 76.920 -999.990 ... R5 2006 11 21 11 34 00 19.5300 -155.5600 3402.00 3397.00 5.00 225147 MLO 2006 11 08 20 10 00 3426-99 P co CCGG 76.560 -999.990 ... R5 2006 11 21 11 48 00 19.5300 -155.5600 3402.00 3397.00 5.00 225146 MLO 2006 11 08 20 19 00 6493-66 S co CCGG 75.250 -999.990 S.. R5 2006 11 21 11 05 00 19.5300 -155.5600 3437.00 3397.00 40.00 225144 MLO 2006 11 08 20 19 00 6494-66 S co CCGG 74.600 -999.990 S.. R5 2006 11 21 11 20 00 19.5300 -155.5600 3437.00 3397.00 40.00 225145 MLO 2006 11 15 19 56 00 639-99 P co CCGG 75.090 -999.990 ... R5 2006 12 01 10 21 00 19.5300 -155.5600 3402.00 3397.00 5.00 225441 MLO 2006 11 15 19 56 00 640-99 P co CCGG 75.020 -999.990 ... R5 2006 12 01 10 35 00 19.5300 -155.5600 3402.00 3397.00 5.00 225442 MLO 2006 11 15 20 04 00 6113-66 S co CCGG 76.570 -999.990 S.. R5 2006 12 01 09 53 00 19.5300 -155.5600 3437.00 3397.00 40.00 225439 MLO 2006 11 15 20 04 00 6114-66 S co CCGG 74.910 -999.990 S.. R5 2006 12 01 10 07 00 19.5300 -155.5600 3437.00 3397.00 40.00 225440 MLO 2006 11 22 20 18 00 1497-99 P co CCGG 90.260 -999.990 ... R5 2006 12 05 12 19 00 19.5300 -155.5600 3402.00 3397.00 5.00 225622 MLO 2006 11 22 20 18 00 900-99 P co CCGG 90.170 -999.990 ... R5 2006 12 05 12 05 00 19.5300 -155.5600 3402.00 3397.00 5.00 225621 MLO 2006 11 22 20 24 00 6078-66 S co CCGG 97.330 -999.990 S.. R5 2006 12 05 11 37 00 19.5300 -155.5600 3437.00 3397.00 40.00 225619 MLO 2006 11 22 20 24 00 6417-66 S co CCGG 96.830 -999.990 S.. R5 2006 12 05 11 51 00 19.5300 -155.5600 3437.00 3397.00 40.00 225620 MLO 2006 11 29 20 10 00 1251-99 P co CCGG 96.810 -999.990 ... R5 2006 12 13 10 10 00 19.5300 -155.5600 3402.00 3397.00 5.00 226155 MLO 2006 11 29 20 10 00 1252-99 P co CCGG 95.900 -999.990 ... R5 2006 12 13 10 25 00 19.5300 -155.5600 3402.00 3397.00 5.00 226156 MLO 2006 11 29 20 17 00 4104-99 S co CCGG 96.450 -999.990 S.. R5 2006 12 13 10 39 00 19.5300 -155.5600 3437.00 3397.00 40.00 226153 MLO 2006 11 29 20 17 00 4356-99 S co CCGG 95.290 -999.990 S.. R5 2006 12 13 10 53 00 19.5300 -155.5600 3437.00 3397.00 40.00 226154 MLO 2006 12 06 20 08 00 4409-99 P co CCGG 104.550 -999.990 ... R5 2006 12 26 13 32 00 19.5300 -155.5600 3402.00 3397.00 5.00 226359 MLO 2006 12 06 20 08 00 4410-99 P co CCGG 104.910 -999.990 ... R5 2006 12 26 13 46 00 19.5300 -155.5600 3402.00 3397.00 5.00 226360 MLO 2006 12 06 20 25 00 769-99 S co CCGG 104.410 -999.990 S.. R5 2006 12 26 13 03 00 19.5300 -155.5600 3437.00 3397.00 40.00 226361 MLO 2006 12 06 20 25 00 770-99 S co CCGG 105.020 -999.990 S.. R5 2006 12 26 13 18 00 19.5300 -155.5600 3437.00 3397.00 40.00 226362 MLO 2006 12 13 20 06 00 1491-99 P co CCGG 94.150 -999.990 ... R5 2007 01 11 11 44 00 19.5300 -155.5600 3402.00 3397.00 5.00 226723 MLO 2006 12 13 20 06 00 1492-99 P co CCGG 94.340 -999.990 ... R5 2007 01 11 11 58 00 19.5300 -155.5600 3402.00 3397.00 5.00 226724 MLO 2006 12 13 20 10 00 941-99 S co CCGG 94.880 -999.990 S.. R5 2007 01 11 12 13 00 19.5300 -155.5600 3437.00 3397.00 40.00 226721 MLO 2006 12 13 20 10 00 942-99 S co CCGG 94.310 -999.990 S.. R5 2007 01 11 12 27 00 19.5300 -155.5600 3437.00 3397.00 40.00 226722 MLO 2006 12 20 20 18 00 1427-99 P co CCGG 129.620 -999.990 ... R5 2007 01 17 11 06 00 19.5300 -155.5600 3402.00 3397.00 5.00 227125 MLO 2006 12 20 20 18 00 1428-99 P co CCGG 129.680 -999.990 ... R5 2007 01 17 11 21 00 19.5300 -155.5600 3402.00 3397.00 5.00 227126 MLO 2006 12 20 20 23 00 2983-99 S co CCGG 119.720 -999.990 S.. R5 2007 01 17 11 35 00 19.5300 -155.5600 3437.00 3397.00 40.00 227121 MLO 2006 12 20 20 23 00 2984-99 S co CCGG 120.850 -999.990 S.. R5 2007 01 17 11 49 00 19.5300 -155.5600 3437.00 3397.00 40.00 227122 MLO 2006 12 27 20 00 00 2967-99 P co CCGG 95.900 -999.990 ... R5 2007 01 17 10 38 00 19.5300 -155.5600 3402.00 3397.00 5.00 227123 MLO 2006 12 27 20 00 00 2968-99 P co CCGG 96.390 -999.990 ... R5 2007 01 17 10 52 00 19.5300 -155.5600 3402.00 3397.00 5.00 227124 MLO 2006 12 27 21 11 00 3725-99 S co CCGG 90.810 -999.990 S.. R5 2007 01 17 10 10 00 19.5300 -155.5600 3437.00 3397.00 40.00 227119 MLO 2006 12 27 21 11 00 3726-99 S co CCGG 93.670 -999.990 S.. R5 2007 01 17 10 24 00 19.5300 -155.5600 3437.00 3397.00 40.00 227120 MLO 2007 01 03 20 15 00 3437-99 P co CCGG 94.200 -999.990 ... R5 2007 02 01 12 22 00 19.5300 -155.5600 3402.00 3397.00 5.00 227828 MLO 2007 01 03 20 24 00 1141-99 S co CCGG 94.250 -999.990 S.. R5 2007 02 01 12 08 00 19.5300 -155.5600 3437.00 3397.00 40.00 227829 MLO 2007 01 10 20 16 00 3785-99 P co CCGG 111.080 -999.990 ... R5 2007 02 27 14 14 00 19.5300 -155.5600 3402.00 3397.00 5.00 229539 MLO 2007 01 10 20 16 00 3786-99 P co CCGG 111.020 -999.990 ... R5 2007 02 27 14 29 00 19.5300 -155.5600 3402.00 3397.00 5.00 229540 MLO 2007 01 10 20 29 00 6137-66 S co CCGG 112.370 -999.990 S.. R5 2007 02 27 14 43 00 19.5300 -155.5600 3437.00 3397.00 40.00 229541 MLO 2007 01 10 20 29 00 6138-66 S co CCGG 112.910 -999.990 S.. R5 2007 02 27 14 57 00 19.5300 -155.5600 3437.00 3397.00 40.00 229542 MLO 2007 01 17 20 07 00 4665-99 P co CCGG 100.170 -999.990 ... R5 2007 02 08 14 49 00 19.5300 -155.5600 3402.00 3397.00 5.00 228468 MLO 2007 01 17 20 07 00 4666-99 P co CCGG 100.640 -999.990 ... R5 2007 02 08 15 03 00 19.5300 -155.5600 3402.00 3397.00 5.00 228469 MLO 2007 01 17 20 15 00 2429-99 S co CCGG 102.700 -999.990 S.. R5 2007 02 08 14 21 00 19.5300 -155.5600 3437.00 3397.00 40.00 228470 MLO 2007 01 17 20 15 00 2430-99 S co CCGG 101.620 -999.990 S.. R5 2007 02 08 14 35 00 19.5300 -155.5600 3437.00 3397.00 40.00 228471 MLO 2007 01 24 20 09 00 2833-99 P co CCGG 169.070 -999.990 P.. R5 2007 02 14 09 21 00 19.5300 -155.5600 3402.00 3397.00 5.00 228947 MLO 2007 01 24 20 09 00 2834-99 P co CCGG 172.100 -999.990 P.. R5 2007 02 14 09 35 00 19.5300 -155.5600 3402.00 3397.00 5.00 228948 MLO 2007 01 24 20 22 00 6071-66 S co CCGG 163.890 -999.990 S.. R5 2007 02 14 08 52 00 19.5300 -155.5600 3437.00 3397.00 40.00 228945 MLO 2007 01 24 20 22 00 6072-66 S co CCGG 163.510 -999.990 S.. R5 2007 02 14 09 06 00 19.5300 -155.5600 3437.00 3397.00 40.00 228946 MLO 2007 01 31 19 50 00 6113-66 S co CCGG 101.930 -999.990 S.. R5 2007 02 15 10 43 00 19.5300 -155.5600 3437.00 3397.00 40.00 229200 MLO 2007 01 31 19 50 00 6114-66 S co CCGG 100.830 -999.990 S.. R5 2007 02 15 10 57 00 19.5300 -155.5600 3437.00 3397.00 40.00 229201 MLO 2007 01 31 20 11 00 1383-99 P co CCGG 109.310 -999.990 ... R5 2007 02 15 11 11 00 19.5300 -155.5600 3402.00 3397.00 5.00 229198 MLO 2007 01 31 20 11 00 1384-99 P co CCGG 109.570 -999.990 ... R5 2007 02 15 11 25 00 19.5300 -155.5600 3402.00 3397.00 5.00 229199 MLO 2007 02 07 20 22 00 3797-99 P co CCGG 111.170 -999.990 ... R5 2007 03 02 11 56 00 19.5300 -155.5600 3402.00 3397.00 5.00 230035 MLO 2007 02 07 20 22 00 3798-99 P co CCGG 111.420 -999.990 ... R5 2007 03 02 12 10 00 19.5300 -155.5600 3402.00 3397.00 5.00 230036 MLO 2007 02 07 20 27 00 1993-99 S co CCGG 110.540 -999.990 S.. R5 2007 03 02 11 28 00 19.5300 -155.5600 3437.00 3397.00 40.00 230039 MLO 2007 02 07 20 27 00 1994-99 S co CCGG 110.470 -999.990 S.. R5 2007 03 02 11 42 00 19.5300 -155.5600 3437.00 3397.00 40.00 230040 MLO 2007 02 14 20 17 00 2300-99 P co CCGG 184.160 -999.990 .X. R5 2007 03 02 13 07 00 19.5300 -155.5600 3402.00 3397.00 5.00 230038 MLO 2007 02 14 20 17 00 869-99 P co CCGG 185.250 -999.990 .X. R5 2007 03 02 12 53 00 19.5300 -155.5600 3402.00 3397.00 5.00 230037 MLO 2007 02 14 20 24 00 6184-66 S co CCGG 184.090 -999.990 S.. R5 2007 03 02 12 25 00 19.5300 -155.5600 3437.00 3397.00 40.00 230041 MLO 2007 02 14 20 24 00 6375-66 S co CCGG 184.300 -999.990 S.. R5 2007 03 02 12 39 00 19.5300 -155.5600 3437.00 3397.00 40.00 230042 MLO 2007 02 21 20 07 00 3265-99 P co CCGG 144.980 -999.990 ... R5 2007 03 14 13 32 00 19.5300 -155.5600 3402.00 3397.00 5.00 230453 MLO 2007 02 21 20 07 00 3266-99 P co CCGG 145.700 -999.990 ... R5 2007 03 14 13 46 00 19.5300 -155.5600 3402.00 3397.00 5.00 230454 MLO 2007 02 21 20 17 00 799-99 S co CCGG 143.330 -999.990 S.. R5 2007 03 14 10 41 00 19.5300 -155.5600 3437.00 3397.00 40.00 230455 MLO 2007 02 21 20 17 00 800-99 S co CCGG 152.380 -999.990 S.. R5 2007 03 14 10 56 00 19.5300 -155.5600 3437.00 3397.00 40.00 230456 MLO 2007 02 28 20 08 00 753-99 P co CCGG 123.530 -999.990 ... R5 2007 03 21 13 06 00 19.5300 -155.5600 3402.00 3397.00 5.00 230847 MLO 2007 02 28 20 08 00 754-99 P co CCGG 122.460 -999.990 ... R5 2007 03 21 13 20 00 19.5300 -155.5600 3402.00 3397.00 5.00 230848 MLO 2007 02 28 20 17 00 2211-99 S co CCGG 122.500 -999.990 S.. R5 2007 03 21 12 37 00 19.5300 -155.5600 3437.00 3397.00 40.00 230845 MLO 2007 02 28 20 17 00 2212-99 S co CCGG 122.660 -999.990 S.. R5 2007 03 21 12 52 00 19.5300 -155.5600 3437.00 3397.00 40.00 230846 MLO 2007 03 06 18 54 00 979-99 P co CCGG 82.310 -999.990 .X. R5 2007 03 28 09 45 00 19.5300 -155.5600 3402.00 3397.00 5.00 231197 MLO 2007 03 06 18 54 00 980-99 P co CCGG 83.110 -999.990 .X. R5 2007 03 28 09 59 00 19.5300 -155.5600 3402.00 3397.00 5.00 231198 MLO 2007 03 06 19 17 00 6001-66 S co CCGG 81.700 -999.990 S.. R5 2007 03 28 09 16 00 19.5300 -155.5600 3437.00 3397.00 40.00 231195 MLO 2007 03 06 19 17 00 6002-66 S co CCGG 80.860 -999.990 S.. R5 2007 03 28 09 31 00 19.5300 -155.5600 3437.00 3397.00 40.00 231196 MLO 2007 03 13 20 02 00 1769-99 P co CCGG 97.980 -999.990 ... R5 2007 04 02 10 30 00 19.5300 -155.5600 3402.00 3397.00 5.00 231631 MLO 2007 03 13 20 02 00 1770-99 P co CCGG 97.780 -999.990 ... R5 2007 04 02 10 45 00 19.5300 -155.5600 3402.00 3397.00 5.00 231632 MLO 2007 03 13 20 11 00 1047-99 S co CCGG 96.970 -999.990 S.. R5 2007 04 02 10 59 00 19.5300 -155.5600 3437.00 3397.00 40.00 231633 MLO 2007 03 13 20 11 00 1048-99 S co CCGG 97.250 -999.990 S.. R5 2007 04 02 11 13 00 19.5300 -155.5600 3437.00 3397.00 40.00 231634 MLO 2007 03 21 20 05 00 3107-99 P co CCGG 165.410 -999.990 .X. R5 2007 04 11 15 12 00 19.5300 -155.5600 3402.00 3397.00 5.00 231855 MLO 2007 03 21 20 05 00 3108-99 P co CCGG 165.630 -999.990 .X. R5 2007 04 11 15 27 00 19.5300 -155.5600 3402.00 3397.00 5.00 231856 MLO 2007 03 21 20 11 00 6621-66 S co CCGG 171.430 -999.990 S.. R5 2007 04 11 14 44 00 19.5300 -155.5600 3437.00 3397.00 40.00 231857 MLO 2007 03 21 20 11 00 6622-66 S co CCGG 168.690 -999.990 S.. R5 2007 04 11 14 58 00 19.5300 -155.5600 3437.00 3397.00 40.00 231858 MLO 2007 03 28 19 17 00 2293-99 P co CCGG 134.550 -999.990 ... R5 2007 04 16 13 06 00 19.5300 -155.5600 3402.00 3397.00 5.00 232312 MLO 2007 03 28 19 17 00 3277-99 P co CCGG 134.260 -999.990 ... R5 2007 04 16 13 21 00 19.5300 -155.5600 3402.00 3397.00 5.00 232313 MLO 2007 03 28 19 22 00 3437-99 S co CCGG 131.460 -999.990 S.. R5 2007 04 16 13 35 00 19.5300 -155.5600 3437.00 3397.00 40.00 232314 MLO 2007 03 28 19 22 00 3527-99 S co CCGG 132.470 -999.990 S.. R5 2007 04 16 13 49 00 19.5300 -155.5600 3437.00 3397.00 40.00 232315 MLO 2007 04 05 20 16 00 1809-99 P co CCGG 127.310 -999.990 ... R5 2007 04 24 13 39 00 19.5300 -155.5600 3402.00 3397.00 5.00 232824 MLO 2007 04 05 20 16 00 1810-99 P co CCGG 127.440 -999.990 ... R5 2007 04 24 13 54 00 19.5300 -155.5600 3402.00 3397.00 5.00 232825 MLO 2007 04 05 20 21 00 2509-99 S co CCGG 119.930 -999.990 S.. R5 2007 04 24 13 11 00 19.5300 -155.5600 3437.00 3397.00 40.00 232826 MLO 2007 04 05 20 21 00 2510-99 S co CCGG 122.400 -999.990 S.. R5 2007 04 24 13 25 00 19.5300 -155.5600 3437.00 3397.00 40.00 232827 MLO 2007 04 11 20 10 00 3981-99 P co CCGG 138.320 -999.990 ... R5 2007 04 20 11 14 00 19.5300 -155.5600 3402.00 3397.00 5.00 233021 MLO 2007 04 11 20 10 00 3982-99 P co CCGG 139.910 -999.990 ... R5 2007 04 20 11 29 00 19.5300 -155.5600 3402.00 3397.00 5.00 233022 MLO 2007 04 11 20 20 00 4643-99 S co CCGG 143.290 -999.990 S.. R5 2007 04 20 10 46 00 19.5300 -155.5600 3437.00 3397.00 40.00 233023 MLO 2007 04 11 20 20 00 4644-99 S co CCGG 146.860 -999.990 S.. R5 2007 04 20 11 00 00 19.5300 -155.5600 3437.00 3397.00 40.00 233024 MLO 2007 04 18 20 16 00 3607-99 P co CCGG 161.510 -999.990 .X. R5 2007 05 04 11 48 00 19.5300 -155.5600 3402.00 3397.00 5.00 233453 MLO 2007 04 18 20 16 00 3608-99 P co CCGG 160.340 -999.990 .X. R5 2007 05 04 12 02 00 19.5300 -155.5600 3402.00 3397.00 5.00 233454 MLO 2007 04 18 20 20 00 6291-66 S co CCGG 159.620 -999.990 S.. R5 2007 05 04 11 19 00 19.5300 -155.5600 3437.00 3397.00 40.00 233451 MLO 2007 04 18 20 20 00 6292-66 S co CCGG 159.740 -999.990 S.. R5 2007 05 04 11 33 00 19.5300 -155.5600 3437.00 3397.00 40.00 233452 MLO 2007 04 25 20 10 00 1105-99 P co CCGG 130.020 -999.990 ... R5 2007 05 08 10 00 00 19.5300 -155.5600 3402.00 3397.00 5.00 233673 MLO 2007 04 25 20 10 00 1106-99 P co CCGG 130.900 -999.990 ... R5 2007 05 08 10 14 00 19.5300 -155.5600 3402.00 3397.00 5.00 233674 MLO 2007 04 25 20 14 00 6071-66 S co CCGG 127.230 -999.990 S.. R5 2007 05 08 10 57 00 19.5300 -155.5600 3437.00 3397.00 40.00 233622 MLO 2007 04 25 20 14 00 6072-66 S co CCGG 127.600 -999.990 S.. R5 2007 05 08 11 11 00 19.5300 -155.5600 3437.00 3397.00 40.00 233623 MLO 2007 05 02 19 58 00 6921-66 P co CCGG 115.280 -999.990 ... R5 2007 05 15 13 09 00 19.5300 -155.5600 3402.00 3397.00 5.00 234081 MLO 2007 05 02 19 58 00 6922-66 P co CCGG 115.100 -999.990 ... R5 2007 05 15 13 23 00 19.5300 -155.5600 3402.00 3397.00 5.00 234082 MLO 2007 05 02 20 12 00 4371-99 S co CCGG 108.890 -999.990 S.. R5 2007 05 15 13 37 00 19.5300 -155.5600 3437.00 3397.00 40.00 234083 MLO 2007 05 02 20 12 00 4372-99 S co CCGG 108.310 -999.990 S.. R5 2007 05 15 13 51 00 19.5300 -155.5600 3437.00 3397.00 40.00 234084 MLO 2007 05 09 20 04 00 2288-99 P co CCGG 94.440 -999.990 ... R5 2007 05 21 15 45 00 19.5300 -155.5600 3402.00 3397.00 5.00 234215 MLO 2007 05 09 20 04 00 2449-99 P co CCGG 94.470 -999.990 ... R5 2007 05 21 15 59 00 19.5300 -155.5600 3402.00 3397.00 5.00 234216 MLO 2007 05 09 20 09 00 4161-99 S co CCGG 94.900 -999.990 S.. R5 2007 05 21 15 31 00 19.5300 -155.5600 3437.00 3397.00 40.00 234214 MLO 2007 05 09 20 09 00 707-99 S co CCGG 95.090 -999.990 S.. R5 2007 05 21 15 16 00 19.5300 -155.5600 3437.00 3397.00 40.00 234213 MLO 2007 05 16 19 49 00 1246-99 S co CCGG 97.710 -999.990 S.. R5 2007 06 04 11 41 00 19.5300 -155.5600 3437.00 3397.00 40.00 234945 MLO 2007 05 16 19 49 00 4591-99 S co CCGG 97.320 -999.990 S.. R5 2007 06 04 11 27 00 19.5300 -155.5600 3437.00 3397.00 40.00 234946 MLO 2007 05 16 20 09 00 1372-99 P co CCGG 97.610 -999.990 ... R5 2007 05 31 14 58 00 19.5300 -155.5600 3402.00 3397.00 5.00 235013 MLO 2007 05 16 20 09 00 1777-99 P co CCGG 98.280 -999.990 ... R5 2007 05 31 15 13 00 19.5300 -155.5600 3402.00 3397.00 5.00 235014 MLO 2007 05 23 19 48 00 1125-99 S co CCGG 107.490 -999.990 S.. R5 2007 06 11 09 01 00 19.5300 -155.5600 3437.00 3397.00 40.00 235417 MLO 2007 05 23 19 48 00 1125-99 S co CCGG 107.970 -999.990 S.. R5 2007 06 11 11 00 00 19.5300 -155.5600 3437.00 3397.00 40.00 235417 MLO 2007 05 23 19 48 00 1126-99 S co CCGG 107.800 -999.990 S.. R5 2007 06 11 09 15 00 19.5300 -155.5600 3437.00 3397.00 40.00 235418 MLO 2007 05 23 19 48 00 1126-99 S co CCGG 107.280 -999.990 S.. R5 2007 06 11 11 14 00 19.5300 -155.5600 3437.00 3397.00 40.00 235418 MLO 2007 05 23 20 17 00 571-99 P co CCGG 105.510 -999.990 ... R5 2007 06 11 09 58 00 19.5300 -155.5600 3402.00 3397.00 5.00 235415 MLO 2007 05 23 20 17 00 571-99 P co CCGG 105.760 -999.990 ... R5 2007 06 11 11 57 00 19.5300 -155.5600 3402.00 3397.00 5.00 235415 MLO 2007 05 23 20 17 00 572-99 P co CCGG 104.910 -999.990 ... R5 2007 06 11 10 12 00 19.5300 -155.5600 3402.00 3397.00 5.00 235416 MLO 2007 05 23 20 17 00 572-99 P co CCGG 104.990 -999.990 ... R5 2007 06 11 12 11 00 19.5300 -155.5600 3402.00 3397.00 5.00 235416 MLO 2007 05 30 19 57 00 6053-66 P co CCGG 96.460 -999.990 ... R5 2007 06 15 14 58 00 19.5300 -155.5600 3402.00 3397.00 5.00 235779 MLO 2007 05 30 19 57 00 6054-66 P co CCGG 96.420 -999.990 ... R5 2007 06 15 15 12 00 19.5300 -155.5600 3402.00 3397.00 5.00 235780 MLO 2007 05 30 20 14 00 1951-99 S co CCGG 94.740 -999.990 S.. R5 2007 06 15 13 32 00 19.5300 -155.5600 3437.00 3397.00 40.00 235781 MLO 2007 05 30 20 14 00 1952-99 S co CCGG 97.320 -999.990 S.. R5 2007 06 15 13 46 00 19.5300 -155.5600 3437.00 3397.00 40.00 235782 MLO 2007 06 06 20 05 00 153-99 P co CCGG 96.380 -999.990 ... R5 2007 06 22 16 55 00 19.5300 -155.5600 3402.00 3397.00 5.00 236254 MLO 2007 06 06 20 05 00 154-99 P co CCGG 95.810 -999.990 ... R5 2007 06 22 17 10 00 19.5300 -155.5600 3402.00 3397.00 5.00 236255 MLO 2007 06 06 20 12 00 2215-99 S co CCGG 94.830 -999.990 S.. R5 2007 06 25 09 24 00 19.5300 -155.5600 3437.00 3397.00 40.00 236256 MLO 2007 06 06 20 12 00 2216-99 S co CCGG 95.120 -999.990 S.. R5 2007 06 25 09 38 00 19.5300 -155.5600 3437.00 3397.00 40.00 236257 MLO 2007 06 13 20 00 00 691-99 P co CCGG 89.550 -999.990 ... R5 2007 06 26 13 31 00 19.5300 -155.5600 3402.00 3397.00 5.00 236420 MLO 2007 06 13 20 00 00 692-99 P co CCGG 89.420 -999.990 ... R5 2007 06 26 13 46 00 19.5300 -155.5600 3402.00 3397.00 5.00 236421 MLO 2007 06 13 20 12 00 4707-99 S co CCGG 86.300 -999.990 S.. R5 2007 06 26 14 00 00 19.5300 -155.5600 3437.00 3397.00 40.00 236422 MLO 2007 06 13 20 12 00 4708-99 S co CCGG 86.390 -999.990 S.. R5 2007 06 26 14 14 00 19.5300 -155.5600 3437.00 3397.00 40.00 236423 MLO 2007 06 20 20 07 00 3073-99 P co CCGG 75.940 -999.990 ... R5 2007 06 29 11 59 00 19.5300 -155.5600 3402.00 3397.00 5.00 237129 MLO 2007 06 20 20 07 00 3074-99 P co CCGG 75.380 -999.990 ... R5 2007 06 29 12 13 00 19.5300 -155.5600 3402.00 3397.00 5.00 237130 MLO 2007 06 20 20 20 00 423-99 S co CCGG 75.380 -999.990 S.. R5 2007 06 29 12 27 00 19.5300 -155.5600 3437.00 3397.00 40.00 237131 MLO 2007 06 20 20 20 00 424-99 S co CCGG 76.190 -999.990 S.. R5 2007 06 29 12 42 00 19.5300 -155.5600 3437.00 3397.00 40.00 237132 MLO 2007 06 27 20 16 00 1207-99 P co CCGG 67.470 -999.990 ... R5 2007 07 05 11 18 00 19.5300 -155.5600 3402.00 3397.00 5.00 237557 MLO 2007 06 27 20 16 00 1208-99 P co CCGG 67.290 -999.990 ... R5 2007 07 05 11 32 00 19.5300 -155.5600 3402.00 3397.00 5.00 237558 MLO 2007 06 27 20 30 00 6249-66 S co CCGG 66.360 -999.990 S.. R5 2007 07 05 10 49 00 19.5300 -155.5600 3437.00 3397.00 40.00 237559 MLO 2007 06 27 20 30 00 6250-66 S co CCGG 66.410 -999.990 S.. R5 2007 07 05 11 04 00 19.5300 -155.5600 3437.00 3397.00 40.00 237560 MLO 2007 07 05 20 24 00 6055-66 P co CCGG 68.560 -999.990 ... R5 2007 07 11 11 22 00 19.5300 -155.5600 3402.00 3397.00 5.00 237903 MLO 2007 07 05 20 24 00 6056-66 P co CCGG 68.370 -999.990 ... R5 2007 07 11 11 36 00 19.5300 -155.5600 3402.00 3397.00 5.00 237904 MLO 2007 07 11 20 07 00 2557-99 S co CCGG 85.630 -999.990 S.. R5 2007 07 23 15 45 00 19.5300 -155.5600 3437.00 3397.00 40.00 238528 MLO 2007 07 11 20 07 00 2558-99 S co CCGG 86.010 -999.990 S.. R5 2007 07 23 15 59 00 19.5300 -155.5600 3437.00 3397.00 40.00 238529 MLO 2007 07 11 20 23 00 3981-99 P co CCGG 85.160 -999.990 ... R5 2007 07 23 15 16 00 19.5300 -155.5600 3402.00 3397.00 5.00 238526 MLO 2007 07 11 20 23 00 3982-99 P co CCGG 84.720 -999.990 ... R5 2007 07 23 15 30 00 19.5300 -155.5600 3402.00 3397.00 5.00 238527 MLO 2007 07 18 19 52 00 1575-99 S co CCGG 63.700 -999.990 S.. R5 2007 07 31 11 03 00 19.5300 -155.5600 3437.00 3397.00 40.00 238906 MLO 2007 07 18 19 52 00 1576-99 S co CCGG 63.680 -999.990 S.. R5 2007 07 31 11 18 00 19.5300 -155.5600 3437.00 3397.00 40.00 238907 MLO 2007 07 18 20 15 00 3037-99 P co CCGG 64.760 -999.990 ... R5 2007 07 31 11 32 00 19.5300 -155.5600 3402.00 3397.00 5.00 238904 MLO 2007 07 18 20 15 00 3038-99 P co CCGG 65.460 -999.990 ... R5 2007 07 31 11 46 00 19.5300 -155.5600 3402.00 3397.00 5.00 238905 MLO 2007 07 25 19 59 00 1095-99 P co CCGG 71.050 -999.990 ... R5 2007 08 01 14 18 00 19.5300 -155.5600 3402.00 3397.00 5.00 239363 MLO 2007 07 25 19 59 00 1096-99 P co CCGG 70.620 -999.990 ... R5 2007 08 01 14 32 00 19.5300 -155.5600 3402.00 3397.00 5.00 239364 MLO 2007 07 25 20 17 00 285-99 S co CCGG 71.890 -999.990 S.. R5 2007 08 01 14 47 00 19.5300 -155.5600 3437.00 3397.00 40.00 239361 MLO 2007 07 25 20 17 00 286-99 S co CCGG 71.210 -999.990 S.. R5 2007 08 01 15 01 00 19.5300 -155.5600 3437.00 3397.00 40.00 239362 MLO 2007 08 01 20 16 00 3763-99 P co CCGG 63.310 -999.990 ... R5 2007 08 07 14 36 00 19.5300 -155.5600 3402.00 3397.00 5.00 239676 MLO 2007 08 01 20 16 00 3764-99 P co CCGG 63.390 -999.990 ... R5 2007 08 07 14 50 00 19.5300 -155.5600 3402.00 3397.00 5.00 239677 MLO 2007 08 01 21 16 00 4845-99 S co CCGG 61.820 -999.990 S.. R5 2007 08 07 15 33 00 19.5300 -155.5600 3437.00 3397.00 40.00 239678 MLO 2007 08 01 21 16 00 4846-99 S co CCGG 62.090 -999.990 S.. R5 2007 08 07 15 47 00 19.5300 -155.5600 3437.00 3397.00 40.00 239679 MLO 2007 08 08 20 27 00 4767-99 P co CCGG 65.050 -999.990 ... R5 2007 08 16 09 34 00 19.5300 -155.5600 3402.00 3397.00 5.00 239940 MLO 2007 08 08 20 27 00 4768-99 P co CCGG 64.770 -999.990 ... R5 2007 08 16 09 49 00 19.5300 -155.5600 3402.00 3397.00 5.00 239941 MLO 2007 08 08 20 32 00 4765-99 S co CCGG 64.940 -999.990 S.. R5 2007 08 16 11 00 00 19.5300 -155.5600 3437.00 3397.00 40.00 239942 MLO 2007 08 08 20 32 00 4766-99 S co CCGG 64.210 -999.990 S.. R5 2007 08 16 11 14 00 19.5300 -155.5600 3437.00 3397.00 40.00 239943 MLO 2007 08 15 20 21 00 47-99 P co CCGG 63.540 -999.990 ... R5 2007 08 28 14 46 00 19.5300 -155.5600 3402.00 3397.00 5.00 240513 MLO 2007 08 15 20 21 00 48-99 P co CCGG 63.190 -999.990 ... R5 2007 08 28 15 00 00 19.5300 -155.5600 3402.00 3397.00 5.00 240514 MLO 2007 08 15 21 26 00 831-99 S co CCGG 65.650 -999.990 S.. R5 2007 08 28 14 17 00 19.5300 -155.5600 3437.00 3397.00 40.00 240511 MLO 2007 08 15 21 26 00 832-99 S co CCGG 64.660 -999.990 S.. R5 2007 08 28 14 31 00 19.5300 -155.5600 3437.00 3397.00 40.00 240512 MLO 2007 08 22 20 15 00 169-99 P co CCGG 91.370 -999.990 ... R5 2007 08 29 17 21 00 19.5300 -155.5600 3402.00 3397.00 5.00 240665 MLO 2007 08 22 20 15 00 170-99 P co CCGG 93.180 -999.990 ... R5 2007 08 29 17 35 00 19.5300 -155.5600 3402.00 3397.00 5.00 240666 MLO 2007 08 22 20 20 00 2695-99 S co CCGG 89.520 -999.990 S.. R5 2007 08 29 17 49 00 19.5300 -155.5600 3437.00 3397.00 40.00 240663 MLO 2007 08 22 20 20 00 2696-99 S co CCGG 90.040 -999.990 S.. R5 2007 08 29 18 03 00 19.5300 -155.5600 3437.00 3397.00 40.00 240664 MLO 2007 08 29 20 24 00 46-99 P co CCGG 67.810 -999.990 ... R5 2007 09 07 13 48 00 19.5300 -155.5600 3402.00 3397.00 5.00 241087 MLO 2007 08 29 20 24 00 634-99 P co CCGG 68.290 -999.990 ... R5 2007 09 07 14 03 00 19.5300 -155.5600 3402.00 3397.00 5.00 241088 MLO 2007 08 29 20 31 00 6232-66 S co CCGG 66.480 -999.990 S.. R5 2007 09 07 14 17 00 19.5300 -155.5600 3437.00 3397.00 40.00 241089 MLO 2007 08 29 20 31 00 6427-66 S co CCGG 66.050 -999.990 S.. R5 2007 09 07 14 31 00 19.5300 -155.5600 3437.00 3397.00 40.00 241090 MLO 2007 09 05 19 58 00 1429-99 P co CCGG 65.910 -999.990 ... R5 2007 09 14 11 36 00 19.5300 -155.5600 3402.00 3397.00 5.00 241459 MLO 2007 09 05 19 58 00 1430-99 P co CCGG 65.630 -999.990 ... R5 2007 09 14 11 50 00 19.5300 -155.5600 3402.00 3397.00 5.00 241460 MLO 2007 09 05 20 12 00 1403-99 S co CCGG 65.220 -999.990 S.. R5 2007 09 14 11 03 00 19.5300 -155.5600 3437.00 3397.00 40.00 241461 MLO 2007 09 05 20 12 00 1404-99 S co CCGG 64.720 -999.990 S.. R5 2007 09 14 11 18 00 19.5300 -155.5600 3437.00 3397.00 40.00 241462 MLO 2007 09 13 20 15 00 2793-99 P co CCGG 82.210 -999.990 ... R5 2007 09 21 11 58 00 19.5300 -155.5600 3402.00 3397.00 5.00 241932 MLO 2007 09 13 20 15 00 2794-99 P co CCGG 82.930 -999.990 ... R5 2007 09 21 12 13 00 19.5300 -155.5600 3402.00 3397.00 5.00 241933 MLO 2007 09 13 20 23 00 3717-99 S co CCGG 79.210 -999.990 S.. R5 2007 09 21 12 27 00 19.5300 -155.5600 3437.00 3397.00 40.00 241934 MLO 2007 09 13 20 23 00 3718-99 S co CCGG 78.740 -999.990 S.. R5 2007 09 21 12 41 00 19.5300 -155.5600 3437.00 3397.00 40.00 241935 MLO 2007 09 20 20 05 00 3781-99 P co CCGG 69.140 -999.990 ... R5 2007 09 28 10 11 00 19.5300 -155.5600 3402.00 3397.00 5.00 242419 MLO 2007 09 20 20 05 00 3782-99 P co CCGG 68.880 -999.990 ... R5 2007 09 28 10 25 00 19.5300 -155.5600 3402.00 3397.00 5.00 242420 MLO 2007 09 20 20 10 00 2757-99 S co CCGG 67.290 -999.990 S.. R5 2007 09 28 11 08 00 19.5300 -155.5600 3437.00 3397.00 40.00 242421 MLO 2007 09 20 20 10 00 2758-99 S co CCGG 68.500 -999.990 S.. R5 2007 09 28 11 22 00 19.5300 -155.5600 3437.00 3397.00 40.00 242422 MLO 2007 09 27 20 22 00 4021-99 P co CCGG 74.880 -999.990 ... R5 2007 10 02 09 26 00 19.5300 -155.5600 3402.00 3397.00 5.00 242637 MLO 2007 09 27 20 22 00 4022-99 P co CCGG 75.060 -999.990 ... R5 2007 10 02 09 41 00 19.5300 -155.5600 3402.00 3397.00 5.00 242638 MLO 2007 09 27 20 26 00 6089-66 S co CCGG 74.820 -999.990 S.. R5 2007 10 02 08 58 00 19.5300 -155.5600 3437.00 3397.00 40.00 242635 MLO 2007 09 27 20 26 00 6090-66 S co CCGG 78.890 -999.990 S.. R5 2007 10 02 09 12 00 19.5300 -155.5600 3437.00 3397.00 40.00 242636 MLO 2007 10 04 20 12 00 3955-99 P co CCGG 89.170 -999.990 ... R5 2007 10 12 14 54 00 19.5300 -155.5600 3402.00 3397.00 5.00 243067 MLO 2007 10 04 20 12 00 3956-99 P co CCGG 88.800 -999.990 ... R5 2007 10 12 15 08 00 19.5300 -155.5600 3402.00 3397.00 5.00 243068 MLO 2007 10 04 20 27 00 2589-99 S co CCGG 86.200 -999.990 S.. R5 2007 10 12 14 25 00 19.5300 -155.5600 3437.00 3397.00 40.00 243069 MLO 2007 10 04 20 27 00 2590-99 S co CCGG 86.430 -999.990 S.. R5 2007 10 12 14 39 00 19.5300 -155.5600 3437.00 3397.00 40.00 243070 MLO 2007 10 11 20 28 00 2471-99 P co CCGG 77.040 -999.990 ... R5 2007 10 22 10 14 00 19.5300 -155.5600 3402.00 3397.00 5.00 243635 MLO 2007 10 11 20 28 00 2472-99 P co CCGG 76.270 -999.990 ... R5 2007 10 22 10 28 00 19.5300 -155.5600 3402.00 3397.00 5.00 243636 MLO 2007 10 11 20 29 00 2407-99 S co CCGG 75.920 -999.990 S.. R5 2007 10 22 10 42 00 19.5300 -155.5600 3437.00 3397.00 40.00 243637 MLO 2007 10 11 20 29 00 2408-99 S co CCGG 76.080 -999.990 S.. R5 2007 10 22 10 57 00 19.5300 -155.5600 3437.00 3397.00 40.00 243638 MLO 2007 10 17 19 56 00 4751-99 P co CCGG 75.820 -999.990 ... R5 2007 10 24 15 13 00 19.5300 -155.5600 3402.00 3397.00 5.00 243758 MLO 2007 10 17 19 56 00 4752-99 P co CCGG 76.240 -999.990 ... R5 2007 10 24 15 27 00 19.5300 -155.5600 3402.00 3397.00 5.00 243759 MLO 2007 10 17 20 09 00 411-99 S co CCGG 74.590 -999.990 S.. R5 2007 10 24 14 16 00 19.5300 -155.5600 3437.00 3397.00 40.00 243760 MLO 2007 10 17 20 09 00 412-99 S co CCGG 74.520 -999.990 S.. R5 2007 10 24 14 30 00 19.5300 -155.5600 3437.00 3397.00 40.00 243761 MLO 2007 10 25 20 08 00 1089-99 P co CCGG 77.650 -999.990 ... R5 2007 11 02 13 17 00 19.5300 -155.5600 3402.00 3397.00 5.00 244305 MLO 2007 10 25 20 08 00 1090-99 P co CCGG 76.840 -999.990 ... R5 2007 11 02 13 31 00 19.5300 -155.5600 3402.00 3397.00 5.00 244306 MLO 2007 10 25 20 14 00 4139-99 S co CCGG 76.530 -999.990 S.. R5 2007 11 05 16 03 00 19.5300 -155.5600 3437.00 3397.00 40.00 244303 MLO 2007 10 25 20 14 00 4140-99 S co CCGG 76.370 -999.990 S.. R5 2007 11 05 16 17 00 19.5300 -155.5600 3437.00 3397.00 40.00 244304 MLO 2007 11 01 20 18 00 148-99 P co CCGG 94.130 -999.990 ... R5 2007 11 07 11 01 00 19.5300 -155.5600 3402.00 3397.00 5.00 244605 MLO 2007 11 01 20 18 00 2666-99 P co CCGG 93.780 -999.990 ... R5 2007 11 07 11 15 00 19.5300 -155.5600 3402.00 3397.00 5.00 244606 MLO 2007 11 01 20 36 00 1241-99 S co CCGG 93.230 -999.990 S.. R5 2007 11 07 11 30 00 19.5300 -155.5600 3437.00 3397.00 40.00 244603 MLO 2007 11 01 20 36 00 2803-99 S co CCGG 93.760 -999.990 S.. R5 2007 11 07 11 44 00 19.5300 -155.5600 3437.00 3397.00 40.00 244604 MLO 2007 11 08 20 20 00 2559-99 P co CCGG 86.800 -999.990 ... R5 2007 11 16 11 22 00 19.5300 -155.5600 3402.00 3397.00 5.00 245011 MLO 2007 11 08 20 20 00 3060-99 P co CCGG 86.870 -999.990 ... R5 2007 11 16 11 36 00 19.5300 -155.5600 3402.00 3397.00 5.00 245012 MLO 2007 11 08 20 26 00 2293-99 S co CCGG 86.010 -999.990 S.. R5 2007 11 16 11 50 00 19.5300 -155.5600 3437.00 3397.00 40.00 245009 MLO 2007 11 08 20 26 00 3221-99 S co CCGG 85.420 -999.990 S.. R5 2007 11 16 12 04 00 19.5300 -155.5600 3437.00 3397.00 40.00 245010 MLO 2007 11 15 20 17 00 2869-99 P co CCGG 87.890 -999.990 ... R5 2007 11 27 10 16 00 19.5300 -155.5600 3402.00 3397.00 5.00 245296 MLO 2007 11 15 20 17 00 2870-99 P co CCGG 88.140 -999.990 ... R5 2007 11 27 10 30 00 19.5300 -155.5600 3402.00 3397.00 5.00 245297 MLO 2007 11 15 20 27 00 3645-99 S co CCGG 86.480 -999.990 S.. R5 2007 11 27 08 50 00 19.5300 -155.5600 3437.00 3397.00 40.00 245294 MLO 2007 11 15 20 27 00 3646-99 S co CCGG 86.380 -999.990 S.. R5 2007 11 27 09 05 00 19.5300 -155.5600 3437.00 3397.00 40.00 245295 MLO 2007 11 21 20 08 00 4723-99 S co CCGG 94.820 -999.990 S.. R5 2007 12 05 12 34 00 19.5300 -155.5600 3437.00 3397.00 40.00 245694 MLO 2007 11 21 20 08 00 4724-99 S co CCGG 94.490 -999.990 S.. R5 2007 12 05 12 48 00 19.5300 -155.5600 3437.00 3397.00 40.00 245695 MLO 2007 11 21 20 31 00 6193-66 P co CCGG 100.950 -999.990 ... R5 2007 12 05 13 03 00 19.5300 -155.5600 3402.00 3397.00 5.00 245696 MLO 2007 11 21 20 31 00 6194-66 P co CCGG 101.410 -999.990 ... R5 2007 12 05 13 17 00 19.5300 -155.5600 3402.00 3397.00 5.00 245697 MLO 2007 11 28 20 04 00 6017-66 P co CCGG 73.860 -999.990 P.. R5 2007 12 12 12 49 00 19.5300 -155.5600 3402.00 3397.00 5.00 245966 MLO 2007 11 28 20 04 00 6018-66 P co CCGG 77.800 -999.990 P.. R5 2007 12 12 13 03 00 19.5300 -155.5600 3402.00 3397.00 5.00 245967 MLO 2007 11 28 20 18 00 767-99 S co CCGG 72.360 -999.990 S.. R5 2007 12 12 13 18 00 19.5300 -155.5600 3437.00 3397.00 40.00 245968 MLO 2007 11 28 20 18 00 768-99 S co CCGG 72.080 -999.990 S.. R5 2007 12 12 13 32 00 19.5300 -155.5600 3437.00 3397.00 40.00 245969 MLO 2007 12 07 21 29 00 3501-99 S co CCGG 94.110 -999.990 S.. R5 2008 01 02 11 19 00 19.5300 -155.5600 3437.00 3397.00 40.00 246987 MLO 2007 12 07 21 29 00 3502-99 S co CCGG 93.230 -999.990 S.. R5 2008 01 02 11 34 00 19.5300 -155.5600 3437.00 3397.00 40.00 246988 MLO 2007 12 07 21 58 00 2051-99 P co CCGG 95.860 -999.990 ... R5 2008 01 02 10 51 00 19.5300 -155.5600 3402.00 3397.00 5.00 246985 MLO 2007 12 07 21 58 00 2052-99 P co CCGG 96.990 -999.990 ... R5 2008 01 02 11 05 00 19.5300 -155.5600 3402.00 3397.00 5.00 246986 MLO 2007 12 13 20 20 00 4889-99 P co CCGG 88.710 -999.990 ... R5 2008 01 21 16 40 00 19.5300 -155.5700 3402.00 3397.00 5.00 247985 MLO 2007 12 13 20 20 00 4890-99 P co CCGG 90.160 -999.990 ... R5 2008 01 21 16 54 00 19.5300 -155.5700 3402.00 3397.00 5.00 247986 MLO 2007 12 13 20 33 00 2609-99 S co CCGG 84.000 -999.990 S.. R5 2008 01 21 16 11 00 19.5300 -155.5700 3437.00 3397.00 40.00 247987 MLO 2007 12 13 20 33 00 2610-99 S co CCGG 88.480 -999.990 S.. R5 2008 01 21 16 26 00 19.5300 -155.5700 3437.00 3397.00 40.00 247988 MLO 2007 12 20 20 27 00 3392-99 P co CCGG 108.440 -999.990 ... R5 2008 01 17 12 26 00 19.5300 -155.5600 3402.00 3397.00 5.00 247613 MLO 2007 12 20 20 27 00 413-99 P co CCGG 105.800 -999.990 ... R5 2008 01 17 12 12 00 19.5300 -155.5600 3402.00 3397.00 5.00 247612 MLO 2007 12 20 20 31 00 6280-66 S co CCGG 103.340 -999.990 S.. R5 2008 01 17 11 43 00 19.5300 -155.5600 3437.00 3397.00 40.00 247614 MLO 2007 12 20 20 31 00 6380-66 S co CCGG 102.730 -999.990 S.. R5 2008 01 17 11 57 00 19.5300 -155.5600 3437.00 3397.00 40.00 247615 MLO 2007 12 26 20 09 00 2227-99 S co CCGG 86.700 -999.990 S.. R5 2008 01 18 10 51 00 19.5300 -155.5600 3437.00 3397.00 40.00 247746 MLO 2007 12 26 20 09 00 2228-99 S co CCGG 86.100 -999.990 S.. R5 2008 01 18 11 06 00 19.5300 -155.5600 3437.00 3397.00 40.00 247747 MLO 2007 12 26 20 38 00 6139-66 P co CCGG 90.970 -999.990 P.. R5 2008 01 18 10 23 00 19.5300 -155.5600 3402.00 3397.00 5.00 247748 MLO 2007 12 26 20 38 00 6140-66 P co CCGG 95.370 -999.990 P.. R5 2008 01 18 10 37 00 19.5300 -155.5600 3402.00 3397.00 5.00 247749 MLO 2008 01 02 20 08 00 4136-99 S co CCGG 108.560 -999.990 S.. R5 2008 01 19 15 19 00 19.5300 -155.5700 3437.00 3397.00 40.00 248056 MLO 2008 01 02 20 08 00 4223-99 S co CCGG 108.340 -999.990 S.. R5 2008 01 19 15 34 00 19.5300 -155.5700 3437.00 3397.00 40.00 248057 MLO 2008 01 02 20 35 00 2461-99 P co CCGG 120.900 -999.990 P.. R5 2008 01 19 15 05 00 19.5300 -155.5700 3402.00 3397.00 5.00 248055 MLO 2008 01 02 20 35 00 670-99 P co CCGG 117.170 -999.990 P.. R5 2008 01 19 14 51 00 19.5300 -155.5700 3402.00 3397.00 5.00 248054 MLO 2008 01 10 20 14 00 4919-99 P co CCGG 102.780 -999.990 P.. V2 2008 01 26 12 58 00 19.5300 -155.5700 3402.00 3397.00 5.00 248369 MLO 2008 01 10 20 14 00 4920-99 P co CCGG 108.300 -999.990 P.. V2 2008 01 26 13 13 00 19.5300 -155.5700 3402.00 3397.00 5.00 248370 MLO 2008 01 10 20 28 00 6493-66 S co CCGG 86.230 -999.990 S.. V2 2008 01 25 14 49 00 19.5300 -155.5700 3437.00 3397.00 40.00 248371 MLO 2008 01 10 20 28 00 6494-66 S co CCGG 86.160 -999.990 S.. V2 2008 01 25 15 05 00 19.5300 -155.5700 3437.00 3397.00 40.00 248372 MLO 2008 01 17 20 16 00 4189-99 P co CCGG 145.900 -999.990 .X. V2 2008 01 30 14 03 00 19.5300 -155.5700 3402.00 3397.00 5.00 248605 MLO 2008 01 17 20 16 00 4190-99 P co CCGG 148.150 -999.990 .X. V2 2008 01 30 14 18 00 19.5300 -155.5700 3402.00 3397.00 5.00 248606 MLO 2008 01 17 20 28 00 769-99 S co CCGG 135.750 -999.990 S.. V2 2008 01 30 13 32 00 19.5300 -155.5700 3437.00 3397.00 40.00 248607 MLO 2008 01 17 20 28 00 770-99 S co CCGG 135.940 -999.990 S.. V2 2008 01 30 13 48 00 19.5300 -155.5700 3437.00 3397.00 40.00 248608 MLO 2008 01 24 19 23 00 4153-99 P co CCGG 149.190 -999.990 P.. V2 2008 02 05 10 30 00 19.5300 -155.5700 3402.00 3397.00 5.00 248994 MLO 2008 01 24 19 23 00 4154-99 P co CCGG 156.250 -999.990 P.. V2 2008 02 05 10 45 00 19.5300 -155.5700 3402.00 3397.00 5.00 248995 MLO 2008 01 24 19 29 00 517-99 S co CCGG 113.050 -999.990 S.. V2 2008 02 05 11 00 00 19.5300 -155.5700 3437.00 3397.00 40.00 248996 MLO 2008 01 24 19 29 00 518-99 S co CCGG 110.560 -999.990 S.. V2 2008 02 05 11 16 00 19.5300 -155.5700 3437.00 3397.00 40.00 248997 MLO 2008 01 31 20 18 00 3661-99 P co CCGG 174.130 -999.990 P.. V2 2008 02 14 09 19 00 19.5300 -155.5700 3402.00 3397.00 5.00 249218 MLO 2008 01 31 20 18 00 3662-99 P co CCGG 183.190 -999.990 P.. V2 2008 02 14 09 34 00 19.5300 -155.5700 3402.00 3397.00 5.00 249219 MLO 2008 01 31 20 24 00 2095-99 S co CCGG 131.180 -999.990 S.. V2 2008 02 14 10 20 00 19.5300 -155.5700 3437.00 3397.00 40.00 249220 MLO 2008 01 31 20 24 00 2096-99 S co CCGG 130.800 -999.990 S.. V2 2008 02 14 10 36 00 19.5300 -155.5700 3437.00 3397.00 40.00 249221 MLO 2008 02 07 20 19 00 2189-99 P co CCGG 105.080 -999.990 ... R5 2008 02 25 11 55 00 19.5300 -155.5700 3402.00 3397.00 5.00 249818 MLO 2008 02 07 20 19 00 2190-99 P co CCGG 107.140 -999.990 ... R5 2008 02 25 12 09 00 19.5300 -155.5700 3402.00 3397.00 5.00 249819 MLO 2008 02 07 20 29 00 691-99 S co CCGG 89.890 -999.990 S.. R5 2008 02 25 11 26 00 19.5300 -155.5700 3437.00 3397.00 40.00 249816 MLO 2008 02 07 20 29 00 692-99 S co CCGG 89.560 -999.990 S.. R5 2008 02 25 11 41 00 19.5300 -155.5700 3437.00 3397.00 40.00 249817 MLO 2008 02 14 20 16 00 1437-99 P co CCGG 122.730 -999.990 ... V2 2008 03 03 12 35 00 19.5300 -155.5700 3402.00 3397.00 5.00 250209 MLO 2008 02 14 20 16 00 1438-99 P co CCGG 124.470 -999.990 ... V2 2008 03 03 12 51 00 19.5300 -155.5700 3402.00 3397.00 5.00 250210 MLO 2008 02 14 20 24 00 2457-99 S co CCGG 115.620 -999.990 S.. V2 2008 03 03 12 05 00 19.5300 -155.5700 3437.00 3397.00 40.00 250211 MLO 2008 02 14 20 24 00 2458-99 S co CCGG 113.950 -999.990 S.. V2 2008 03 03 12 20 00 19.5300 -155.5700 3437.00 3397.00 40.00 250212 MLO 2008 02 20 19 52 00 2621-99 S co CCGG 97.620 -999.990 S.. R5 2008 03 05 12 38 00 19.5300 -155.5700 3437.00 3397.00 40.00 250248 MLO 2008 02 20 19 52 00 2622-99 S co CCGG 93.710 -999.990 S.. R5 2008 03 05 12 52 00 19.5300 -155.5700 3437.00 3397.00 40.00 250249 MLO 2008 02 20 21 15 00 2105-99 P co CCGG 88.150 -999.990 ... R5 2008 03 05 13 07 00 19.5300 -155.5700 3402.00 3397.00 5.00 250244 MLO 2008 02 20 21 15 00 2106-99 P co CCGG 88.050 -999.990 ... R5 2008 03 05 13 21 00 19.5300 -155.5700 3402.00 3397.00 5.00 250245 MLO 2008 02 28 20 20 00 1743-99 P co CCGG 97.220 -999.990 P.. V2 2008 03 11 16 39 00 19.5300 -155.5700 3402.00 3397.00 5.00 250640 MLO 2008 02 28 20 20 00 1744-99 P co CCGG 100.370 -999.990 P.. V2 2008 03 11 16 54 00 19.5300 -155.5700 3402.00 3397.00 5.00 250641 MLO 2008 02 28 20 32 00 2919-99 S co CCGG 72.780 -999.990 S.. V2 2008 03 11 16 08 00 19.5300 -155.5700 3437.00 3397.00 40.00 250638 MLO 2008 02 28 20 32 00 2920-99 S co CCGG 72.490 -999.990 S.. V2 2008 03 11 16 24 00 19.5300 -155.5700 3437.00 3397.00 40.00 250639 MLO 2008 03 06 20 12 00 1579-99 P co CCGG 139.030 -999.990 ... V2 2008 03 19 11 41 00 19.5300 -155.5700 3402.00 3397.00 5.00 251095 MLO 2008 03 06 20 12 00 1580-99 P co CCGG 141.500 -999.990 ... V2 2008 03 19 11 56 00 19.5300 -155.5700 3402.00 3397.00 5.00 251096 MLO 2008 03 06 20 21 00 3601-99 S co CCGG 131.870 -999.990 S.. V2 2008 03 19 11 10 00 19.5300 -155.5700 3437.00 3397.00 40.00 251097 MLO 2008 03 06 20 21 00 3602-99 S co CCGG 130.810 -999.990 S.. V2 2008 03 19 11 26 00 19.5300 -155.5700 3437.00 3397.00 40.00 251098 MLO 2008 03 13 20 21 00 359-99 P co CCGG 95.940 -999.990 ... R5 2008 03 26 14 30 00 19.5300 -155.5700 3402.00 3397.00 5.00 251384 MLO 2008 03 13 20 21 00 360-99 P co CCGG 95.500 -999.990 ... R5 2008 03 26 14 44 00 19.5300 -155.5700 3402.00 3397.00 5.00 251385 MLO 2008 03 13 20 29 00 6559-66 S co CCGG 84.080 -999.990 S.. R5 2008 03 26 14 02 00 19.5300 -155.5700 3437.00 3397.00 40.00 251386 MLO 2008 03 13 20 29 00 6560-66 S co CCGG 83.460 -999.990 S.. R5 2008 03 26 14 16 00 19.5300 -155.5700 3437.00 3397.00 40.00 251387 MLO 2008 03 20 20 16 00 2601-99 P co CCGG 110.620 -999.990 P.. R5 2008 04 02 13 38 00 19.5300 -155.5700 3402.00 3397.00 5.00 251721 MLO 2008 03 20 20 16 00 2602-99 P co CCGG 113.570 -999.990 P.. R5 2008 04 02 13 52 00 19.5300 -155.5700 3402.00 3397.00 5.00 251722 MLO 2008 03 20 20 22 00 565-99 S co CCGG 82.100 -999.990 S.. R5 2008 04 02 14 07 00 19.5300 -155.5700 3437.00 3397.00 40.00 251719 MLO 2008 03 20 20 22 00 566-99 S co CCGG 81.440 -999.990 S.. R5 2008 04 02 14 21 00 19.5300 -155.5700 3437.00 3397.00 40.00 251720 MLO 2008 03 27 20 24 00 4537-99 P co CCGG 82.900 -999.990 .X. R5 2008 04 08 11 01 00 19.5300 -155.5700 3402.00 3397.00 5.00 251994 MLO 2008 03 27 20 24 00 4538-99 P co CCGG 82.960 -999.990 .X. R5 2008 04 08 11 16 00 19.5300 -155.5700 3402.00 3397.00 5.00 251995 MLO 2008 03 27 20 28 00 2017-99 S co CCGG 83.910 -999.990 S.. R5 2008 04 08 10 33 00 19.5300 -155.5700 3437.00 3397.00 40.00 251992 MLO 2008 03 27 20 28 00 2018-99 S co CCGG 87.670 -999.990 S.. R5 2008 04 08 10 47 00 19.5300 -155.5700 3437.00 3397.00 40.00 251993 MLO 2008 04 03 20 23 00 2855-99 P co CCGG 149.790 -999.990 ... V2 2008 04 17 10 08 00 19.5300 -155.5700 3402.00 3397.00 5.00 252610 MLO 2008 04 03 20 23 00 2856-99 P co CCGG 150.310 -999.990 ... V2 2008 04 17 10 23 00 19.5300 -155.5700 3402.00 3397.00 5.00 252611 MLO 2008 04 03 20 26 00 1841-99 S co CCGG 141.730 -999.990 S.. V2 2008 04 17 11 10 00 19.5300 -155.5700 3437.00 3397.00 40.00 252612 MLO 2008 04 03 20 26 00 1842-99 S co CCGG 142.810 -999.990 S.. V2 2008 04 17 11 25 00 19.5300 -155.5700 3437.00 3397.00 40.00 252613 MLO 2008 04 10 20 13 00 1424-99 S co CCGG 69.980 -999.990 S.. R5 2008 04 28 16 40 00 19.5300 -155.5700 3437.00 3397.00 40.00 253185 MLO 2008 04 10 20 13 00 3846-99 S co CCGG 70.610 -999.990 S.. R5 2008 04 28 16 26 00 19.5300 -155.5700 3437.00 3397.00 40.00 253184 MLO 2008 04 10 20 39 00 4103-99 P co CCGG 61.570 -999.990 P.. R5 2008 04 28 15 58 00 19.5300 -155.5700 3402.00 3397.00 5.00 253182 MLO 2008 04 10 20 39 00 824-99 P co CCGG 70.280 -999.990 P.. R5 2008 04 28 16 12 00 19.5300 -155.5700 3402.00 3397.00 5.00 253183 MLO 2008 04 17 20 18 00 3624-99 P co CCGG 86.220 -999.990 ... V2 2008 05 05 11 28 00 19.5300 -155.5700 3402.00 3397.00 5.00 253455 MLO 2008 04 17 20 18 00 4741-99 P co CCGG 85.160 -999.990 ... V2 2008 05 05 11 43 00 19.5300 -155.5700 3402.00 3397.00 5.00 253456 MLO 2008 04 17 20 23 00 3508-99 S co CCGG 83.060 -999.990 S.. V2 2008 05 05 10 57 00 19.5300 -155.5700 3437.00 3397.00 40.00 253457 MLO 2008 04 17 20 23 00 4180-99 S co CCGG 82.920 -999.990 S.. V2 2008 05 05 11 13 00 19.5300 -155.5700 3437.00 3397.00 40.00 253458 MLO 2008 04 24 20 27 00 2199-99 P co CCGG 88.040 -999.990 ... V2 2008 05 05 14 33 00 19.5400 -155.5800 3402.00 3397.00 5.00 253666 MLO 2008 04 24 20 27 00 2200-99 P co CCGG 87.740 -999.990 ... V2 2008 05 05 14 49 00 19.5400 -155.5800 3402.00 3397.00 5.00 253667 MLO 2008 04 24 20 35 00 2369-99 S co CCGG 87.310 -999.990 S.. V2 2008 05 05 15 04 00 19.5400 -155.5800 3437.00 3397.00 40.00 253668 MLO 2008 04 24 20 35 00 2370-99 S co CCGG 87.250 -999.990 S.. V2 2008 05 05 15 19 00 19.5400 -155.5800 3437.00 3397.00 40.00 253669 MLO 2008 05 01 20 15 00 2387-99 P co CCGG 88.160 -999.990 ... V2 2008 05 08 14 02 00 19.5400 -155.5800 3402.00 3397.00 5.00 253954 MLO 2008 05 01 20 15 00 2388-99 P co CCGG 89.090 -999.990 ... V2 2008 05 08 14 17 00 19.5400 -155.5800 3402.00 3397.00 5.00 253955 MLO 2008 05 01 20 25 00 1357-99 S co CCGG 91.410 -999.990 S.. V2 2008 05 08 13 31 00 19.5400 -155.5800 3437.00 3397.00 40.00 253956 MLO 2008 05 01 20 25 00 1358-99 S co CCGG 90.030 -999.990 S.. V2 2008 05 08 13 47 00 19.5400 -155.5800 3437.00 3397.00 40.00 253957 MLO 2008 05 08 20 11 00 193-99 P co CCGG 117.870 -999.990 ... V2 2008 05 21 13 56 00 19.5400 -155.5800 3402.00 3397.00 5.00 254485 MLO 2008 05 08 20 11 00 194-99 P co CCGG 118.510 -999.990 ... V2 2008 05 21 14 11 00 19.5400 -155.5800 3402.00 3397.00 5.00 254486 MLO 2008 05 08 20 21 00 2355-99 S co CCGG 115.380 -999.990 S.. V2 2008 05 21 12 54 00 19.5400 -155.5800 3437.00 3397.00 40.00 254487 MLO 2008 05 08 20 21 00 2356-99 S co CCGG 114.890 -999.990 S.. V2 2008 05 21 13 10 00 19.5400 -155.5800 3437.00 3397.00 40.00 254488 MLO 2008 05 14 20 10 00 6397-66 S co CCGG 105.190 -999.990 S.. V2 2008 05 28 11 35 00 19.5400 -155.5800 3437.00 3397.00 40.00 254754 MLO 2008 05 14 20 10 00 6398-66 S co CCGG 104.640 -999.990 S.. V2 2008 05 28 11 50 00 19.5400 -155.5800 3437.00 3397.00 40.00 254755 MLO 2008 05 14 20 28 00 6023-66 P co CCGG 107.030 -999.990 ... V2 2008 05 28 12 05 00 19.5400 -155.5800 3402.00 3397.00 5.00 254752 MLO 2008 05 14 20 28 00 6024-66 P co CCGG 106.780 -999.990 ... V2 2008 05 28 12 21 00 19.5400 -155.5800 3402.00 3397.00 5.00 254753 MLO 2008 05 22 20 17 00 3007-99 P co CCGG 95.220 -999.990 ... V2 2008 06 04 13 19 00 19.5400 -155.5800 3402.00 3397.00 5.00 255073 MLO 2008 05 22 20 17 00 3008-99 P co CCGG 95.480 -999.990 ... V2 2008 06 04 13 34 00 19.5400 -155.5800 3402.00 3397.00 5.00 255074 MLO 2008 05 22 20 23 00 67-99 S co CCGG 93.700 -999.990 S.. V2 2008 06 04 12 48 00 19.5400 -155.5800 3437.00 3397.00 40.00 255075 MLO 2008 05 22 20 23 00 68-99 S co CCGG 93.950 -999.990 S.. V2 2008 06 04 13 03 00 19.5400 -155.5800 3437.00 3397.00 40.00 255076 MLO 2008 05 29 20 23 00 4603-99 P co CCGG 83.460 -999.990 ... V2 2008 06 11 10 28 00 19.5400 -155.5800 3402.00 3397.00 5.00 255336 MLO 2008 05 29 20 23 00 4604-99 P co CCGG 83.790 -999.990 ... V2 2008 06 11 10 43 00 19.5400 -155.5800 3402.00 3397.00 5.00 255337 MLO 2008 05 29 20 31 00 1949-99 S co CCGG 82.290 -999.990 S.. V2 2008 06 10 16 33 00 19.5400 -155.5800 3437.00 3397.00 40.00 255334 MLO 2008 05 29 20 31 00 1950-99 S co CCGG 81.590 -999.990 S.. V2 2008 06 10 16 49 00 19.5400 -155.5800 3437.00 3397.00 40.00 255335 MLO 2008 06 05 20 27 00 3927-99 P co CCGG 93.800 -999.990 ... V2 2008 06 17 12 15 00 19.5400 -155.5800 3402.00 3397.00 5.00 255746 MLO 2008 06 05 20 27 00 3928-99 P co CCGG 93.000 -999.990 ... V2 2008 06 17 12 30 00 19.5400 -155.5800 3402.00 3397.00 5.00 255747 MLO 2008 06 05 20 30 00 3399-99 S co CCGG 88.670 -999.990 S.. V2 2008 06 17 09 10 00 19.5400 -155.5800 3437.00 3397.00 40.00 255748 MLO 2008 06 05 20 30 00 3400-99 S co CCGG 88.700 -999.990 S.. V2 2008 06 17 09 25 00 19.5400 -155.5800 3437.00 3397.00 40.00 255749 MLO 2008 06 10 20 18 00 4909-99 P co CCGG 94.710 -999.990 ... V2 2008 06 23 12 39 00 19.5400 -155.5800 3402.00 3397.00 5.00 255999 MLO 2008 06 10 20 18 00 4910-99 P co CCGG 94.560 -999.990 ... V2 2008 06 23 12 55 00 19.5400 -155.5800 3402.00 3397.00 5.00 256000 MLO 2008 06 10 20 23 00 2249-99 S co CCGG 91.060 -999.990 S.. V2 2008 06 23 12 09 00 19.5400 -155.5800 3437.00 3397.00 40.00 256013 MLO 2008 06 10 20 23 00 2250-99 S co CCGG 91.240 -999.990 S.. V2 2008 06 23 12 24 00 19.5400 -155.5800 3437.00 3397.00 40.00 256014 MLO 2008 06 19 20 08 00 4987-99 P co CCGG 90.800 -999.990 ... V2 2008 06 26 14 00 00 19.5400 -155.5800 3402.00 3397.00 5.00 256423 MLO 2008 06 19 20 08 00 4988-99 P co CCGG 91.090 -999.990 ... V2 2008 06 26 14 15 00 19.5400 -155.5800 3402.00 3397.00 5.00 256424 MLO 2008 06 19 20 24 00 4097-99 S co CCGG 88.740 -999.990 S.. V2 2008 06 26 13 29 00 19.5400 -155.5800 3437.00 3397.00 40.00 256425 MLO 2008 06 19 20 24 00 4098-99 S co CCGG 88.400 -999.990 S.. V2 2008 06 26 13 45 00 19.5400 -155.5800 3437.00 3397.00 40.00 256426 MLO 2008 06 26 19 57 00 4695-99 P co CCGG 76.850 -999.990 ... R5 2008 07 10 15 28 00 19.5400 -155.5800 3402.00 3397.00 5.00 257138 MLO 2008 06 26 19 57 00 4696-99 P co CCGG 77.410 -999.990 ... R5 2008 07 10 15 42 00 19.5400 -155.5800 3402.00 3397.00 5.00 257139 MLO 2008 06 26 20 19 00 39-99 S co CCGG 74.460 -999.990 S.. R5 2008 07 10 14 59 00 19.5400 -155.5800 3437.00 3397.00 40.00 257140 MLO 2008 06 26 20 19 00 40-99 S co CCGG 76.550 -999.990 S.. R5 2008 07 10 15 13 00 19.5400 -155.5800 3437.00 3397.00 40.00 257141 MLO 2008 07 03 20 20 00 4379-99 P co CCGG 69.690 -999.990 ... V2 2008 07 18 13 17 00 19.5400 -155.5800 3402.00 3397.00 5.00 257516 MLO 2008 07 03 20 20 00 4380-99 P co CCGG 69.570 -999.990 ... V2 2008 07 18 13 33 00 19.5400 -155.5800 3402.00 3397.00 5.00 257517 MLO 2008 07 03 20 26 00 6571-66 S co CCGG 67.930 -999.990 S.. V2 2008 07 18 12 47 00 19.5400 -155.5800 3437.00 3397.00 40.00 257518 MLO 2008 07 03 20 26 00 6572-66 S co CCGG 68.530 -999.990 S.. V2 2008 07 18 13 02 00 19.5400 -155.5800 3437.00 3397.00 40.00 257519 MLO 2008 07 10 20 11 00 553-99 P co CCGG 69.070 -999.990 ... V2 2008 07 21 15 31 00 19.5400 -155.5800 3402.00 3397.00 5.00 257642 MLO 2008 07 10 20 11 00 554-99 P co CCGG 68.500 -999.990 ... V2 2008 07 21 15 47 00 19.5400 -155.5800 3402.00 3397.00 5.00 257643 MLO 2008 07 10 20 24 00 2871-99 S co CCGG 66.720 -999.990 S.. V2 2008 07 21 14 30 00 19.5400 -155.5800 3437.00 3397.00 40.00 257644 MLO 2008 07 10 20 24 00 2872-99 S co CCGG 66.160 -999.990 S.. V2 2008 07 21 14 45 00 19.5400 -155.5800 3437.00 3397.00 40.00 257645 MLO 2008 07 17 20 51 00 1139-99 P co CCGG 81.470 -999.990 ... R5 2008 07 24 12 44 00 19.5400 -155.5800 3402.00 3397.00 5.00 258111 MLO 2008 07 17 20 51 00 1140-99 P co CCGG 82.490 -999.990 ... R5 2008 07 24 12 58 00 19.5400 -155.5800 3402.00 3397.00 5.00 258112 MLO 2008 07 17 20 59 00 1663-99 S co CCGG 79.210 -999.990 S.. R5 2008 07 29 14 41 00 19.5400 -155.5800 3437.00 3397.00 40.00 258113 MLO 2008 07 17 20 59 00 1664-99 S co CCGG 79.680 -999.990 S.. R5 2008 07 29 14 56 00 19.5400 -155.5800 3437.00 3397.00 40.00 258114 MLO 2008 07 24 20 07 00 425-99 P co CCGG 63.520 -999.990 ... V2 2008 08 04 13 57 00 19.5400 -155.5800 3402.00 3397.00 5.00 258571 MLO 2008 07 24 20 07 00 426-99 P co CCGG 62.130 -999.990 ... V2 2008 08 04 14 12 00 19.5400 -155.5800 3402.00 3397.00 5.00 258572 MLO 2008 07 24 20 18 00 2967-99 S co CCGG 61.190 -999.990 S.. V2 2008 08 04 11 52 00 19.5400 -155.5800 3437.00 3397.00 40.00 258569 MLO 2008 07 24 20 18 00 2968-99 S co CCGG 61.440 -999.990 S.. V2 2008 08 04 12 07 00 19.5400 -155.5800 3437.00 3397.00 40.00 258570 MLO 2008 07 31 20 15 00 503-99 P co CCGG 60.440 -999.990 ... V2 2008 08 13 09 38 00 19.5400 -155.5800 3402.00 3397.00 5.00 258868 MLO 2008 07 31 20 15 00 504-99 P co CCGG 60.250 -999.990 ... V2 2008 08 13 09 53 00 19.5400 -155.5800 3402.00 3397.00 5.00 258869 MLO 2008 07 31 20 19 00 6839-66 S co CCGG 59.280 -999.990 S.. V2 2008 08 12 16 46 00 19.5400 -155.5800 3437.00 3397.00 40.00 258872 MLO 2008 07 31 20 19 00 6840-66 S co CCGG 58.720 -999.990 S.. V2 2008 08 12 17 01 00 19.5400 -155.5800 3437.00 3397.00 40.00 258873 MLO 2008 08 08 19 47 00 591-99 S co CCGG 65.250 -999.990 S.. V2 2008 08 22 12 05 00 19.5400 -155.5800 3437.00 3397.00 40.00 259509 MLO 2008 08 08 19 47 00 592-99 S co CCGG 64.440 -999.990 S.. V2 2008 08 22 12 20 00 19.5400 -155.5800 3437.00 3397.00 40.00 259510 MLO 2008 08 08 20 05 00 1523-99 P co CCGG 66.650 -999.990 ... V2 2008 08 22 12 35 00 19.5400 -155.5800 3402.00 3397.00 5.00 259507 MLO 2008 08 08 20 05 00 1524-99 P co CCGG 67.160 -999.990 ... V2 2008 08 22 12 51 00 19.5400 -155.5800 3402.00 3397.00 5.00 259508 MLO 2008 08 14 20 09 00 2233-99 P co CCGG 67.900 -999.990 ... V2 2008 08 29 09 40 00 19.5400 -155.5800 3402.00 3397.00 5.00 259659 MLO 2008 08 14 20 09 00 2234-99 P co CCGG 67.560 -999.990 ... V2 2008 08 29 09 55 00 19.5400 -155.5800 3402.00 3397.00 5.00 259660 MLO 2008 08 14 20 17 00 6061-66 S co CCGG 65.060 -999.990 S.. V2 2008 08 29 09 09 00 19.5400 -155.5800 3437.00 3397.00 40.00 259661 MLO 2008 08 14 20 17 00 6062-66 S co CCGG 64.720 -999.990 S.. V2 2008 08 29 09 24 00 19.5400 -155.5800 3437.00 3397.00 40.00 259662 MLO 2008 08 21 20 12 00 631-99 P co CCGG 66.010 -999.990 ... R5 2008 09 04 11 27 00 19.5400 -155.5800 3402.00 3397.00 5.00 260036 MLO 2008 08 21 20 12 00 632-99 P co CCGG 66.390 -999.990 ... R5 2008 09 04 11 41 00 19.5400 -155.5800 3402.00 3397.00 5.00 260037 MLO 2008 08 21 20 16 00 6593-66 S co CCGG 66.560 -999.990 S.. R5 2008 09 04 11 56 00 19.5400 -155.5800 3437.00 3397.00 40.00 260038 MLO 2008 08 21 20 16 00 6594-66 S co CCGG 66.370 -999.990 S.. R5 2008 09 04 12 10 00 19.5400 -155.5800 3437.00 3397.00 40.00 260039 MLO 2008 08 26 20 05 00 3635-99 P co CCGG 64.350 -999.990 ... R5 2008 09 10 14 10 00 19.5400 -155.5800 3402.00 3397.00 5.00 260485 MLO 2008 08 26 20 05 00 3636-99 P co CCGG 65.840 -999.990 ... R5 2008 09 10 14 24 00 19.5400 -155.5800 3402.00 3397.00 5.00 260486 MLO 2008 08 26 20 21 00 4281-99 S co CCGG 67.270 -999.990 S.. R5 2008 09 10 14 39 00 19.5400 -155.5800 3437.00 3397.00 40.00 260487 MLO 2008 08 26 20 21 00 4282-99 S co CCGG 67.490 -999.990 S.. R5 2008 09 10 14 53 00 19.5400 -155.5800 3437.00 3397.00 40.00 260488 MLO 2008 09 04 19 58 00 4675-99 P co CCGG 58.890 -999.990 ... R5 2008 09 17 12 01 00 19.5400 -155.5800 3402.00 3397.00 5.00 260915 MLO 2008 09 04 19 58 00 4676-99 P co CCGG 59.700 -999.990 ... R5 2008 09 17 12 16 00 19.5400 -155.5800 3402.00 3397.00 5.00 260916 MLO 2008 09 04 20 13 00 3445-99 S co CCGG 58.920 -999.990 S.. R5 2008 09 17 11 33 00 19.5400 -155.5800 3437.00 3397.00 40.00 260917 MLO 2008 09 04 20 13 00 3446-99 S co CCGG 58.990 -999.990 S.. R5 2008 09 17 11 47 00 19.5400 -155.5800 3437.00 3397.00 40.00 260918 MLO 2008 09 11 20 07 00 2351-99 P co CCGG 72.790 -999.990 ... V2 2008 09 19 14 51 00 19.5400 -155.5800 3402.00 3397.00 5.00 261178 MLO 2008 09 11 20 07 00 2352-99 P co CCGG 72.950 -999.990 ... V2 2008 09 19 15 06 00 19.5400 -155.5800 3402.00 3397.00 5.00 261179 MLO 2008 09 11 20 11 00 3245-99 S co CCGG 73.170 -999.990 S.. V2 2008 09 19 14 20 00 19.5400 -155.5800 3437.00 3397.00 40.00 261180 MLO 2008 09 11 20 11 00 3246-99 S co CCGG 71.130 -999.990 S.. V2 2008 09 19 14 36 00 19.5400 -155.5800 3437.00 3397.00 40.00 261181 MLO 2008 09 18 20 12 00 483-99 P co CCGG 63.850 -999.990 ... R5 2008 09 25 12 46 00 19.5400 -155.5800 3402.00 3397.00 5.00 261382 MLO 2008 09 18 20 12 00 484-99 P co CCGG 64.830 -999.990 ... R5 2008 09 25 13 00 00 19.5400 -155.5800 3402.00 3397.00 5.00 261383 MLO 2008 09 18 20 20 00 6395-66 S co CCGG 61.040 -999.990 S.. R5 2008 09 25 12 17 00 19.5400 -155.5800 3437.00 3397.00 40.00 261380 MLO 2008 09 18 20 20 00 6396-66 S co CCGG 61.300 -999.990 S.. R5 2008 09 25 12 32 00 19.5400 -155.5800 3437.00 3397.00 40.00 261381 MLO 2008 09 25 20 07 00 1148-99 P co CCGG 62.230 -999.990 ... R5 2008 10 08 14 58 00 19.5400 -155.5800 3402.00 3397.00 5.00 262050 MLO 2008 09 25 20 07 00 926-99 P co CCGG 62.760 -999.990 ... R5 2008 10 08 15 12 00 19.5400 -155.5800 3402.00 3397.00 5.00 262051 MLO 2008 09 25 20 12 00 1010-99 S co CCGG 60.950 -999.990 S.. R5 2008 10 08 15 27 00 19.5400 -155.5800 3437.00 3397.00 40.00 262048 MLO 2008 09 25 20 12 00 3806-99 S co CCGG 60.230 -999.990 S.. R5 2008 10 08 15 41 00 19.5400 -155.5800 3437.00 3397.00 40.00 262049 MLO 2008 10 02 20 15 00 5059-99 P co CCGG 82.590 -999.990 ... V2 2008 10 22 15 45 00 19.5400 -155.5800 3402.00 3397.00 5.00 262562 MLO 2008 10 02 20 15 00 5060-99 P co CCGG 83.220 -999.990 ... V2 2008 10 22 16 01 00 19.5400 -155.5800 3402.00 3397.00 5.00 262563 MLO 2008 10 02 20 40 00 6537-66 S co CCGG 80.460 -999.990 S.. V2 2008 10 22 15 14 00 19.5400 -155.5800 3437.00 3397.00 40.00 262564 MLO 2008 10 02 20 40 00 6538-66 S co CCGG 80.390 -999.990 S.. V2 2008 10 22 15 30 00 19.5400 -155.5800 3437.00 3397.00 40.00 262565 MLO 2008 10 09 20 09 00 305-99 P co CCGG 87.400 -999.990 ... R5 2008 10 23 13 28 00 19.5400 -155.5800 3402.00 3397.00 5.00 262837 MLO 2008 10 09 20 09 00 306-99 P co CCGG 87.040 -999.990 ... R5 2008 10 23 13 42 00 19.5400 -155.5800 3402.00 3397.00 5.00 262838 MLO 2008 10 09 20 20 00 2439-99 S co CCGG 84.620 -999.990 S.. R5 2008 10 23 12 59 00 19.5400 -155.5800 3437.00 3397.00 40.00 262839 MLO 2008 10 09 20 20 00 2440-99 S co CCGG 84.020 -999.990 S.. R5 2008 10 23 13 14 00 19.5400 -155.5800 3437.00 3397.00 40.00 262840 MLO 2008 10 16 20 10 00 621-99 P co CCGG 81.170 -999.990 ... V2 2008 10 27 13 37 00 19.5400 -155.5800 3402.00 3397.00 5.00 263111 MLO 2008 10 16 20 10 00 622-99 P co CCGG 81.060 -999.990 ... V2 2008 10 27 13 52 00 19.5400 -155.5800 3402.00 3397.00 5.00 263112 MLO 2008 10 16 20 20 00 3463-99 S co CCGG 80.570 -999.990 S.. V2 2008 10 27 14 08 00 19.5400 -155.5800 3437.00 3397.00 40.00 263113 MLO 2008 10 16 20 20 00 3464-99 S co CCGG 80.090 -999.990 S.. V2 2008 10 27 14 23 00 19.5400 -155.5800 3437.00 3397.00 40.00 263114 MLO 2008 10 23 20 17 00 1468-99 P co CCGG 85.690 -999.990 ... V2 2008 11 04 13 22 00 19.5400 -155.5800 3402.00 3397.00 5.00 263393 MLO 2008 10 23 20 17 00 4080-99 P co CCGG 86.230 -999.990 ... V2 2008 11 04 13 38 00 19.5400 -155.5800 3402.00 3397.00 5.00 263394 MLO 2008 10 23 20 24 00 3732-99 S co CCGG 80.940 -999.990 S.. V2 2008 11 04 13 53 00 19.5400 -155.5800 3437.00 3397.00 40.00 263395 MLO 2008 10 23 20 24 00 4308-99 S co CCGG 80.720 -999.990 S.. V2 2008 11 04 14 09 00 19.5400 -155.5800 3437.00 3397.00 40.00 263396 MLO 2008 10 30 20 24 00 799-99 P co CCGG 74.960 -999.990 P.. V2 2008 11 10 13 02 00 19.5400 -155.5800 3402.00 3397.00 5.00 263689 MLO 2008 10 30 20 24 00 800-99 P co CCGG 78.460 -999.990 P.. V2 2008 11 10 13 17 00 19.5400 -155.5800 3402.00 3397.00 5.00 263690 MLO 2008 10 30 20 30 00 2245-99 S co CCGG 71.390 -999.990 S.. V2 2008 11 11 11 09 00 19.5400 -155.5800 3437.00 3397.00 40.00 263691 MLO 2008 10 30 20 30 00 2246-99 S co CCGG 72.580 -999.990 S.. V2 2008 11 11 11 24 00 19.5400 -155.5800 3437.00 3397.00 40.00 263692 MLO 2008 11 06 20 20 00 2658-99 P co CCGG 66.350 -999.990 ... R5 2008 11 20 13 16 00 19.5400 -155.5800 3402.00 3397.00 5.00 264035 MLO 2008 11 06 20 20 00 3624-99 P co CCGG 66.120 -999.990 ... R5 2008 11 20 13 02 00 19.5400 -155.5800 3402.00 3397.00 5.00 264036 MLO 2008 11 06 20 25 00 4164-99 S co CCGG 68.500 -999.990 S.. V2 2008 11 20 13 32 00 19.5400 -155.5800 3437.00 3397.00 40.00 264037 MLO 2008 11 06 20 25 00 4173-99 S co CCGG 69.170 -999.990 S.. V2 2008 11 20 13 47 00 19.5400 -155.5800 3437.00 3397.00 40.00 264038 MLO 2008 11 13 20 20 00 2311-99 P co CCGG 88.110 -999.990 ... V2 2008 12 02 12 54 00 19.5400 -155.5800 3402.00 3397.00 5.00 264615 MLO 2008 11 13 20 20 00 2312-99 P co CCGG 87.440 -999.990 ... V2 2008 12 02 13 09 00 19.5400 -155.5800 3402.00 3397.00 5.00 264616 MLO 2008 11 13 20 31 00 187-99 S co CCGG 86.130 -999.990 S.. V2 2008 12 02 12 23 00 19.5400 -155.5800 3437.00 3397.00 40.00 264613 MLO 2008 11 13 20 31 00 188-99 S co CCGG 85.960 -999.990 S.. V2 2008 12 02 12 38 00 19.5400 -155.5800 3437.00 3397.00 40.00 264614 MLO 2008 11 20 19 57 00 2934-99 P co CCGG 82.310 -999.990 ... V2 2008 12 05 14 14 00 19.5400 -155.5800 3402.00 3397.00 5.00 264912 MLO 2008 11 20 19 57 00 447-99 P co CCGG 83.010 -999.990 ... V2 2008 12 05 13 59 00 19.5400 -155.5800 3402.00 3397.00 5.00 264911 MLO 2008 11 20 20 07 00 3319-99 S co CCGG 80.560 -999.990 S.. V2 2008 12 05 13 43 00 19.5400 -155.5800 3437.00 3397.00 40.00 264914 MLO 2008 11 20 20 07 00 807-99 S co CCGG 80.490 -999.990 S.. V2 2008 12 05 13 28 00 19.5400 -155.5800 3437.00 3397.00 40.00 264913 MLO 2008 11 26 20 21 00 1975-99 P co CCGG 73.450 -999.990 ... V2 2008 12 17 12 34 00 19.5400 -155.5800 3402.00 3397.00 5.00 265819 MLO 2008 11 26 20 21 00 2784-99 P co CCGG 73.860 -999.990 ... V2 2008 12 17 12 49 00 19.5400 -155.5800 3402.00 3397.00 5.00 265820 MLO 2008 11 26 20 36 00 2674-99 S co CCGG 72.890 -999.990 S.. V2 2008 12 17 12 03 00 19.5400 -155.5800 3437.00 3397.00 40.00 265817 MLO 2008 11 26 20 36 00 4323-99 S co CCGG 72.430 -999.990 S.. V2 2008 12 17 12 18 00 19.5400 -155.5800 3437.00 3397.00 40.00 265818 MLO 2008 12 04 20 18 00 1641-99 P co CCGG 82.360 -999.990 ... R5 2008 12 18 15 21 00 19.5400 -155.5800 3402.00 3397.00 5.00 265793 MLO 2008 12 04 20 18 00 1642-99 P co CCGG 82.210 -999.990 ... R5 2008 12 18 15 36 00 19.5400 -155.5800 3402.00 3397.00 5.00 265794 MLO 2008 12 04 20 21 00 1287-99 S co CCGG 82.420 -999.990 S.. R5 2008 12 18 15 50 00 19.5400 -155.5800 3437.00 3397.00 40.00 265795 MLO 2008 12 04 20 21 00 1288-99 S co CCGG 83.150 -999.990 S.. R5 2008 12 18 16 04 00 19.5400 -155.5800 3437.00 3397.00 40.00 265796 MLO 2008 12 11 20 14 00 1827-99 P co CCGG 74.430 -999.990 ... V2 2009 01 13 16 04 00 19.5400 -155.5800 3402.00 3397.00 5.00 267414 MLO 2008 12 11 20 14 00 1828-99 P co CCGG 74.490 -999.990 ... V2 2009 01 13 16 19 00 19.5400 -155.5800 3402.00 3397.00 5.00 267415 MLO 2008 12 11 20 19 00 843-99 S co CCGG 73.350 -999.990 S.. V2 2009 01 13 16 35 00 19.5400 -155.5800 3437.00 3397.00 40.00 267416 MLO 2008 12 11 20 19 00 844-99 S co CCGG 73.330 -999.990 S.. V2 2009 01 13 16 50 00 19.5400 -155.5800 3437.00 3397.00 40.00 267417 MLO 2008 12 17 19 54 00 3813-99 P co CCGG 86.890 -999.990 ... R5 2009 01 05 10 53 00 19.5400 -155.5800 3402.00 3397.00 5.00 266648 MLO 2008 12 17 19 54 00 3814-99 P co CCGG 86.470 -999.990 ... R5 2009 01 05 11 07 00 19.5400 -155.5800 3402.00 3397.00 5.00 266649 MLO 2008 12 17 20 10 00 2627-99 S co CCGG 84.700 -999.990 S.. R5 2009 01 05 10 24 00 19.5400 -155.5800 3437.00 3397.00 40.00 266650 MLO 2008 12 17 20 10 00 2628-99 S co CCGG 85.530 -999.990 S.. R5 2009 01 05 10 39 00 19.5400 -155.5800 3437.00 3397.00 40.00 266651 MLO 2008 12 24 20 02 00 6023-66 P co CCGG 87.370 -999.990 ... V2 2009 01 09 15 17 00 19.5400 -155.5800 3402.00 3397.00 5.00 267135 MLO 2008 12 24 20 02 00 6024-66 P co CCGG 86.850 -999.990 ... V2 2009 01 09 15 33 00 19.5400 -155.5800 3402.00 3397.00 5.00 267136 MLO 2008 12 24 20 15 00 631-99 S co CCGG 85.360 -999.990 S.. V2 2009 01 09 14 47 00 19.5400 -155.5800 3437.00 3397.00 40.00 267137 MLO 2008 12 24 20 15 00 632-99 S co CCGG 85.430 -999.990 S.. V2 2009 01 09 15 02 00 19.5400 -155.5800 3437.00 3397.00 40.00 267138 MLO 2009 01 02 20 18 00 4315-99 P co CCGG 81.490 -999.990 ... R5 2009 01 15 15 41 00 19.5400 -155.5800 3402.00 3397.00 5.00 267507 MLO 2009 01 02 20 18 00 4316-99 P co CCGG 81.510 -999.990 ... R5 2009 01 15 15 55 00 19.5400 -155.5800 3402.00 3397.00 5.00 267508 MLO 2009 01 02 20 28 00 6395-66 S co CCGG 80.620 -999.990 S.. R5 2009 01 15 14 44 00 19.5400 -155.5800 3437.00 3397.00 40.00 267509 MLO 2009 01 02 20 28 00 6396-66 S co CCGG 81.050 -999.990 S.. R5 2009 01 15 14 58 00 19.5400 -155.5800 3437.00 3397.00 40.00 267510 MLO 2009 01 08 20 14 00 3093-99 P co CCGG 91.260 -999.990 ... R5 2009 01 21 12 34 00 19.5400 -155.5800 3402.00 3397.00 5.00 267819 MLO 2009 01 08 20 14 00 3604-99 P co CCGG 91.380 -999.990 ... R5 2009 01 21 12 48 00 19.5400 -155.5800 3402.00 3397.00 5.00 267820 MLO 2009 01 08 20 23 00 2349-99 S co CCGG 88.830 -999.990 S.. R5 2009 01 21 11 37 00 19.5400 -155.5800 3437.00 3397.00 40.00 267821 MLO 2009 01 08 20 23 00 4683-99 S co CCGG 88.390 -999.990 S.. R5 2009 01 21 11 51 00 19.5400 -155.5800 3437.00 3397.00 40.00 267822 MLO 2009 01 15 20 15 00 1272-99 S co CCGG 96.080 -999.990 S.. R5 2009 01 26 15 48 00 19.5400 -155.5800 3437.00 3397.00 40.00 268177 MLO 2009 01 15 20 15 00 3894-99 S co CCGG 96.490 -999.990 S.. R5 2009 01 26 16 02 00 19.5400 -155.5800 3437.00 3397.00 40.00 268178 MLO 2009 01 15 20 37 00 228-99 P co CCGG 99.770 -999.990 ... R5 2009 01 26 15 20 00 19.5400 -155.5800 3402.00 3397.00 5.00 268175 MLO 2009 01 15 20 37 00 3221-99 P co CCGG 99.810 -999.990 ... R5 2009 01 26 15 34 00 19.5400 -155.5800 3402.00 3397.00 5.00 268176 MLO 2009 01 22 20 12 00 2054-99 P co CCGG 113.690 -999.990 ... R5 2009 02 04 13 36 00 19.5400 -155.5800 3402.00 3397.00 5.00 268550 MLO 2009 01 22 20 12 00 26-99 P co CCGG 113.270 -999.990 ... R5 2009 02 04 13 22 00 19.5400 -155.5800 3402.00 3397.00 5.00 268549 MLO 2009 01 22 20 18 00 1607-99 S co CCGG 112.520 -999.990 S.. R5 2009 02 04 12 54 00 19.5400 -155.5800 3437.00 3397.00 40.00 268551 MLO 2009 01 22 20 18 00 1608-99 S co CCGG 112.060 -999.990 S.. R5 2009 02 04 13 08 00 19.5400 -155.5800 3437.00 3397.00 40.00 268552 MLO 2009 01 29 20 18 00 4931-99 P co CCGG 109.930 -999.990 ... R5 2009 02 12 12 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 269218 MLO 2009 01 29 20 18 00 4932-99 P co CCGG 110.210 -999.990 ... R5 2009 02 12 13 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 269219 MLO 2009 01 29 20 23 00 2523-99 S co CCGG 108.780 -999.990 S.. R5 2009 02 12 13 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 269220 MLO 2009 01 29 20 23 00 2524-99 S co CCGG 109.290 -999.990 S.. R5 2009 02 12 13 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 269221 MLO 2009 02 05 20 23 00 4573-99 P co CCGG 99.230 -999.990 ... V2 2009 02 18 15 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 269672 MLO 2009 02 05 20 23 00 4574-99 P co CCGG 99.020 -999.990 ... V2 2009 02 18 16 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 269673 MLO 2009 02 05 21 09 00 1811-99 S co CCGG 95.980 -999.990 S.. R5 2009 02 18 16 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 269674 MLO 2009 02 05 21 09 00 1812-99 S co CCGG 95.420 -999.990 S.. R5 2009 02 18 16 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 269675 MLO 2009 02 12 20 03 00 1399-99 S co CCGG 75.340 -999.990 S.. R5 2009 02 23 14 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 269947 MLO 2009 02 12 20 03 00 1400-99 S co CCGG 75.930 -999.990 S.. R5 2009 02 23 14 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 269948 MLO 2009 02 12 20 31 00 237-99 P co CCGG 78.660 -999.990 ... R5 2009 02 23 13 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 269945 MLO 2009 02 12 20 31 00 238-99 P co CCGG 78.670 -999.990 ... R5 2009 02 23 14 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 269946 MLO 2009 02 19 20 18 00 1000-99 P co CCGG 88.960 -999.990 ... V2 2009 03 03 11 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 270357 MLO 2009 02 19 20 18 00 999-99 P co CCGG 88.700 -999.990 ... V2 2009 03 03 11 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 270358 MLO 2009 02 19 20 25 00 1053-99 S co CCGG 84.050 -999.990 S.. V2 2009 03 03 10 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 270359 MLO 2009 02 19 20 25 00 1054-99 S co CCGG 83.350 -999.990 S.. V2 2009 03 03 11 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 270360 MLO 2009 02 26 20 18 00 4321-99 P co CCGG 127.630 -999.990 ... V2 2009 03 07 12 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 270833 MLO 2009 02 26 20 18 00 456-99 P co CCGG 127.530 -999.990 ... V2 2009 03 07 12 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 270832 MLO 2009 02 26 20 28 00 4993-99 S co CCGG 126.660 -999.990 S.. V2 2009 03 07 12 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 270835 MLO 2009 02 26 20 28 00 570-99 S co CCGG 127.070 -999.990 S.. V2 2009 03 07 11 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 270834 MLO 2009 03 05 20 25 00 1411-99 P co CCGG 123.840 -999.990 ... V2 2009 03 13 12 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 271472 MLO 2009 03 05 20 25 00 3844-99 P co CCGG 123.720 -999.990 ... V2 2009 03 13 12 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 271473 MLO 2009 03 05 20 35 00 1137-99 S co CCGG 122.680 -999.990 S.. V2 2009 03 13 12 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 271470 MLO 2009 03 05 20 35 00 3527-99 S co CCGG 122.850 -999.990 S.. V2 2009 03 13 13 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 271471 MLO 2009 03 12 20 09 00 4177-99 S co CCGG 162.340 -999.990 S.. R5 2009 03 20 15 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 271888 MLO 2009 03 12 20 09 00 4178-99 S co CCGG 161.740 -999.990 S.. R5 2009 03 20 15 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 271889 MLO 2009 03 12 20 24 00 5027-99 P co CCGG 163.080 -999.990 .X. R5 2009 03 20 15 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 271886 MLO 2009 03 12 20 24 00 5028-99 P co CCGG 163.620 -999.990 .X. R5 2009 03 20 15 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 271887 MLO 2009 03 19 20 08 00 6345-66 S co CCGG 91.850 -999.990 S.. V2 2009 04 01 12 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 272561 MLO 2009 03 19 20 08 00 6346-66 S co CCGG 92.920 -999.990 S.. V2 2009 04 01 12 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 272562 MLO 2009 03 19 20 25 00 1977-99 P co CCGG 95.850 -999.990 ... V2 2009 04 01 11 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 272559 MLO 2009 03 19 20 25 00 1978-99 P co CCGG 94.910 -999.990 ... V2 2009 04 01 11 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 272560 MLO 2009 03 25 19 32 00 2293-99 P co CCGG 103.490 -999.990 ... R5 2009 04 08 15 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 272989 MLO 2009 03 25 19 32 00 2383-99 P co CCGG 101.950 -999.990 ... R5 2009 04 08 15 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 272990 MLO 2009 03 25 23 09 00 4166-99 S co CCGG 107.570 -999.990 S.. R5 2009 04 08 15 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 272991 MLO 2009 03 25 23 09 00 818-99 S co CCGG 108.080 -999.990 S.. R5 2009 04 08 15 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 272992 MLO 2009 04 02 20 14 00 2506-99 P co CCGG 113.280 -999.990 ... V2 2009 04 15 11 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 273400 MLO 2009 04 02 20 14 00 4620-99 P co CCGG 113.240 -999.990 ... V2 2009 04 15 11 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 273401 MLO 2009 04 02 20 22 00 226-99 S co CCGG 110.890 -999.990 S.. V2 2009 04 15 11 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 273402 MLO 2009 04 02 20 22 00 4121-99 S co CCGG 110.440 -999.990 S.. V2 2009 04 15 11 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 273403 MLO 2009 04 09 20 12 00 1337-99 P co CCGG 106.880 -999.990 ... R5 2009 04 20 14 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 274006 MLO 2009 04 09 20 12 00 45-99 P co CCGG 106.790 -999.990 ... R5 2009 04 20 14 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 274005 MLO 2009 04 09 20 20 00 1533-99 S co CCGG 106.060 -999.990 S.. R5 2009 04 20 13 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 274007 MLO 2009 04 09 20 20 00 2691-99 S co CCGG 106.570 -999.990 S.. R5 2009 04 20 13 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 274008 MLO 2009 04 16 20 20 00 39-99 P co CCGG 93.260 -999.990 ... V2 2009 04 24 15 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 274266 MLO 2009 04 16 20 20 00 40-99 P co CCGG 93.990 -999.990 ... V2 2009 04 24 16 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 274267 MLO 2009 04 16 20 26 00 1151-99 S co CCGG 88.180 -999.990 S.. V2 2009 04 24 15 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 274268 MLO 2009 04 16 20 26 00 1152-99 S co CCGG 87.720 -999.990 S.. V2 2009 04 24 15 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 274269 MLO 2009 04 23 19 56 00 1302-99 S co CCGG 78.280 -999.990 S.. V2 2009 05 05 15 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 274776 MLO 2009 04 23 19 56 00 4111-99 S co CCGG 76.930 -999.990 S.. V2 2009 05 05 15 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 274777 MLO 2009 04 23 20 20 00 1591-99 P co CCGG 80.620 -999.990 ... V2 2009 05 05 14 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 274774 MLO 2009 04 23 20 20 00 2823-99 P co CCGG 79.140 -999.990 ... V2 2009 05 05 14 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 274775 MLO 2009 04 30 19 58 00 3511-99 S co CCGG 100.720 -999.990 S.. R5 2009 05 15 12 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 275145 MLO 2009 04 30 19 58 00 3512-99 S co CCGG 100.040 -999.990 S.. R5 2009 05 15 12 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 275146 MLO 2009 04 30 20 24 00 3392-99 P co CCGG 106.640 -999.990 ... R5 2009 05 15 11 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 275144 MLO 2009 04 30 20 24 00 5061-99 P co CCGG 105.670 -999.990 ... R5 2009 05 15 11 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 275143 MLO 2009 05 07 20 04 00 1895-99 S co CCGG 89.760 -999.990 S.. V2 2009 05 21 12 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 275525 MLO 2009 05 07 20 04 00 1896-99 S co CCGG 90.120 -999.990 S.. V2 2009 05 21 12 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 275526 MLO 2009 05 07 20 21 00 2759-99 P co CCGG 89.520 -999.990 ... V2 2009 05 21 11 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 275527 MLO 2009 05 07 20 21 00 2760-99 P co CCGG 89.390 -999.990 ... V2 2009 05 21 11 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 275528 MLO 2009 05 14 20 19 00 3469-99 P co CCGG 106.440 -999.990 ... V2 2009 05 27 15 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 276037 MLO 2009 05 14 20 19 00 3470-99 P co CCGG 106.570 -999.990 ... V2 2009 05 27 15 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 276038 MLO 2009 05 14 20 23 00 335-99 S co CCGG 102.550 -999.990 S.. R5 2009 05 27 15 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 276039 MLO 2009 05 14 20 23 00 336-99 S co CCGG 102.700 -999.990 S.. R5 2009 05 27 15 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 276040 MLO 2009 05 21 19 58 00 3171-99 S co CCGG 103.240 -999.990 S.. V2 2009 06 17 13 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 276356 MLO 2009 05 21 19 58 00 3172-99 S co CCGG 103.050 -999.990 S.. V2 2009 06 17 13 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 276357 MLO 2009 05 21 20 18 00 1657-99 P co CCGG 103.810 -999.990 ... V2 2009 06 17 12 37 00 19.5362 -155.5763 3402.00 3397.00 5.00 276354 MLO 2009 05 21 20 18 00 1658-99 P co CCGG 103.610 -999.990 ... V2 2009 06 17 12 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 276355 MLO 2009 05 28 20 18 00 599-99 P co CCGG 86.600 -999.990 ... R5 2009 06 22 16 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 276954 MLO 2009 05 28 20 18 00 600-99 P co CCGG 86.290 -999.990 ... R5 2009 06 22 16 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 276955 MLO 2009 05 28 20 24 00 6571-66 S co CCGG 86.920 -999.990 S.. V2 2009 06 22 16 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 276956 MLO 2009 05 28 20 24 00 6572-66 S co CCGG 86.560 -999.990 S.. V2 2009 06 22 16 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 276957 MLO 2009 06 03 19 52 00 6139-66 P co CCGG 88.980 -999.990 ... V2 2009 06 25 15 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 277330 MLO 2009 06 03 19 52 00 6140-66 P co CCGG 89.430 -999.990 ... V2 2009 06 25 15 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 277331 MLO 2009 06 03 20 11 00 1223-99 S co CCGG 88.060 -999.990 S.. V2 2009 06 25 15 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 277332 MLO 2009 06 03 20 11 00 1224-99 S co CCGG 87.630 -999.990 S.. V2 2009 06 25 15 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 277333 MLO 2009 06 11 20 25 00 3957-99 S co CCGG 87.180 -999.990 S.. V2 2009 07 01 14 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 277628 MLO 2009 06 11 20 25 00 3958-99 S co CCGG 86.790 -999.990 S.. V2 2009 07 01 14 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 277629 MLO 2009 06 11 20 47 00 1347-99 P co CCGG 89.100 -999.990 ... V2 2009 07 01 14 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 277626 MLO 2009 06 11 20 47 00 1348-99 P co CCGG 88.770 -999.990 ... V2 2009 07 01 15 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 277627 MLO 2009 06 17 19 57 00 2073-99 P co CCGG 77.560 -999.990 ... V2 2009 07 07 14 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 278335 MLO 2009 06 17 19 57 00 2074-99 P co CCGG 76.930 -999.990 ... V2 2009 07 07 14 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 278336 MLO 2009 06 17 20 13 00 3937-99 S co CCGG 75.960 -999.990 S.. V2 2009 07 07 15 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 278337 MLO 2009 06 17 20 13 00 3938-99 S co CCGG 75.410 -999.990 S.. V2 2009 07 07 15 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 278338 MLO 2009 06 24 19 57 00 5005-99 P co CCGG 79.890 -999.990 ... V2 2009 07 14 13 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 278538 MLO 2009 06 24 19 57 00 5006-99 P co CCGG 80.940 -999.990 ... V2 2009 07 14 13 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 278539 MLO 2009 06 24 20 11 00 1741-99 S co CCGG 91.460 -999.990 S.. V2 2009 07 14 11 58 00 19.5362 -155.5763 3437.00 3397.00 40.00 278540 MLO 2009 06 24 20 11 00 1742-99 S co CCGG 91.870 -999.990 S.. V2 2009 07 14 12 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 278541 MLO 2009 07 02 20 02 00 6366-66 S co CCGG 82.460 -999.990 S.. R5 2009 07 20 13 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 279264 MLO 2009 07 02 20 02 00 6621-66 S co CCGG 81.950 -999.990 S.. R5 2009 07 20 13 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 279265 MLO 2009 07 02 20 21 00 2336-99 P co CCGG 81.210 -999.990 ... R5 2009 07 20 14 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 279262 MLO 2009 07 02 20 21 00 4548-99 P co CCGG 81.470 -999.990 ... R5 2009 07 20 14 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 279263 MLO 2009 07 09 20 20 00 4289-99 P co CCGG 65.330 -999.990 ... R5 2009 07 24 11 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 279442 MLO 2009 07 09 20 20 00 4290-99 P co CCGG 66.150 -999.990 ... R5 2009 07 24 12 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 279443 MLO 2009 07 09 20 27 00 1285-99 S co CCGG 65.220 -999.990 S.. R5 2009 07 24 11 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 279444 MLO 2009 07 09 20 27 00 1286-99 S co CCGG 63.740 -999.990 S.. R5 2009 07 24 11 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 279445 MLO 2009 07 16 20 12 00 3579-99 P co CCGG 67.720 -999.990 ... R5 2009 07 28 14 28 00 19.5362 -155.5763 3402.00 3397.00 5.00 280151 MLO 2009 07 16 20 12 00 3580-99 P co CCGG 67.540 -999.990 ... R5 2009 07 28 14 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 280152 MLO 2009 07 16 20 18 00 3923-99 S co CCGG 66.000 -999.990 S.. R5 2009 07 28 15 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 280153 MLO 2009 07 16 20 18 00 3924-99 S co CCGG 66.360 -999.990 S.. R5 2009 07 28 15 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 280154 MLO 2009 07 21 20 06 00 1094-99 P co CCGG 65.630 -999.990 ... R5 2009 08 27 13 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 282086 MLO 2009 07 21 20 06 00 4487-99 P co CCGG 63.790 -999.990 ... R5 2009 08 27 13 18 00 19.5362 -155.5763 3402.00 3397.00 5.00 282085 MLO 2009 07 21 20 15 00 1969-99 S co CCGG 62.270 -999.990 S.. R5 2009 08 27 12 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 282083 MLO 2009 07 21 20 15 00 4358-99 S co CCGG 62.390 -999.990 S.. R5 2009 08 27 13 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 282084 MLO 2009 07 30 20 00 00 6605-66 S co CCGG 65.790 -999.990 S.. V2 2009 08 07 15 29 00 19.5362 -155.5763 3437.00 3397.00 40.00 280781 MLO 2009 07 30 20 00 00 6606-66 S co CCGG 65.620 -999.990 S.. V2 2009 08 07 15 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 280782 MLO 2009 07 30 20 26 00 977-99 P co CCGG 66.960 -999.990 ... V2 2009 08 07 16 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 280779 MLO 2009 07 30 20 26 00 978-99 P co CCGG 67.230 -999.990 ... V2 2009 08 07 16 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 280780 MLO 2009 08 06 20 01 00 243-99 S co CCGG 66.010 -999.990 S.. V2 2009 08 14 14 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 281262 MLO 2009 08 06 20 01 00 417-99 S co CCGG 66.050 -999.990 S.. V2 2009 08 14 15 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 281263 MLO 2009 08 06 20 25 00 2-99 P co CCGG 70.810 -999.990 ... V2 2009 08 14 15 18 00 19.5362 -155.5763 3402.00 3397.00 5.00 281264 MLO 2009 08 06 20 25 00 3496-99 P co CCGG 71.610 -999.990 ... V2 2009 08 14 15 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 281265 MLO 2009 08 13 19 57 00 1545-99 S co CCGG 60.710 -999.990 S.. R5 2009 08 25 14 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 281708 MLO 2009 08 13 19 57 00 6076-66 S co CCGG 59.730 -999.990 S.. R5 2009 08 25 14 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 281709 MLO 2009 08 13 20 23 00 2413-99 P co CCGG 61.440 -999.990 ... R5 2009 08 25 14 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 281710 MLO 2009 08 13 20 23 00 3974-99 P co CCGG 61.080 -999.990 ... R5 2009 08 25 14 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 281711 MLO 2009 08 18 20 06 00 2951-99 S co CCGG 68.200 -999.990 S.. R5 2009 08 31 12 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 282222 MLO 2009 08 18 20 06 00 3075-99 S co CCGG 67.700 -999.990 S.. R5 2009 08 31 12 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 282223 MLO 2009 08 18 20 24 00 1866-99 P co CCGG 68.430 -999.990 ... R5 2009 08 31 12 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 282224 MLO 2009 08 18 20 24 00 1879-99 P co CCGG 68.520 -999.990 ... R5 2009 08 31 12 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 282225 MLO 2009 08 25 20 02 00 249-99 S co CCGG 60.990 -999.990 S.. V2 2009 09 02 12 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 282607 MLO 2009 08 25 20 02 00 73-99 S co CCGG 61.630 -999.990 S.. V2 2009 09 02 12 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 282608 MLO 2009 08 25 20 23 00 1317-99 P co CCGG 65.150 -999.990 P.. V2 2009 09 02 11 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 282605 MLO 2009 08 25 20 23 00 1327-99 P co CCGG 85.540 -999.990 P.. V2 2009 09 02 12 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 282606 MLO 2009 09 01 20 04 00 1766-99 S co CCGG 68.240 -999.990 S.. V2 2009 09 10 14 59 00 19.5362 -155.5763 3437.00 3397.00 40.00 282963 MLO 2009 09 01 20 04 00 3343-99 S co CCGG 68.310 -999.990 S.. V2 2009 09 10 15 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 282964 MLO 2009 09 01 20 23 00 3447-99 P co CCGG 84.010 -999.990 ... V2 2009 09 10 15 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 282961 MLO 2009 09 01 20 23 00 4613-99 P co CCGG 86.150 -999.990 ... V2 2009 09 10 15 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 282962 MLO 2009 09 08 20 12 00 2694-99 S co CCGG 68.600 -999.990 S.. V2 2009 09 18 12 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 283385 MLO 2009 09 08 20 12 00 4301-99 S co CCGG 68.100 -999.990 S.. V2 2009 09 18 12 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 283386 MLO 2009 09 08 20 33 00 2685-99 P co CCGG 74.460 -999.990 ... V2 2009 09 18 12 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 283399 MLO 2009 09 08 20 33 00 4643-99 P co CCGG 74.510 -999.990 ... V2 2009 09 18 13 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 283400 MLO 2009 09 15 20 01 00 1945-99 S co CCGG 73.490 -999.990 S.. V2 2009 09 24 11 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 283773 MLO 2009 09 15 20 01 00 1946-99 S co CCGG 73.640 -999.990 S.. V2 2009 09 24 11 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 283774 MLO 2009 09 15 20 39 00 1707-99 P co CCGG 77.900 -999.990 ... V2 2009 09 24 12 22 00 19.5362 -155.5763 3402.00 3397.00 5.00 283771 MLO 2009 09 15 20 39 00 1708-99 P co CCGG 79.820 -999.990 ... V2 2009 09 24 12 37 00 19.5362 -155.5763 3402.00 3397.00 5.00 283772 MLO 2009 09 22 20 05 00 4925-99 S co CCGG 68.640 -999.990 S.. V2 2009 09 29 12 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 284120 MLO 2009 09 22 20 05 00 4926-99 S co CCGG 68.550 -999.990 S.. V2 2009 09 29 12 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 284121 MLO 2009 09 22 20 25 00 601-99 P co CCGG 70.120 -999.990 ... V2 2009 09 29 12 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 284122 MLO 2009 09 22 20 25 00 602-99 P co CCGG 70.160 -999.990 ... V2 2009 09 29 13 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 284123 MLO 2009 09 30 19 58 00 4127-99 P co CCGG 82.800 -999.990 ... V2 2009 10 05 16 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 284543 MLO 2009 09 30 19 58 00 4128-99 P co CCGG 83.310 -999.990 ... V2 2009 10 05 16 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 284544 MLO 2009 09 30 20 12 00 2409-99 S co CCGG 85.230 -999.990 S.. V2 2009 10 05 15 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 284545 MLO 2009 09 30 20 12 00 2410-99 S co CCGG 83.980 -999.990 S.. V2 2009 10 05 15 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 284546 MLO 2009 10 06 20 03 00 433-99 S co CCGG 78.350 -999.990 S.. V2 2009 10 16 17 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 285082 MLO 2009 10 06 20 03 00 434-99 S co CCGG 78.410 -999.990 S.. V2 2009 10 16 17 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 285083 MLO 2009 10 06 20 30 00 159-99 P co CCGG 80.290 -999.990 ... V2 2009 10 19 11 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 285080 MLO 2009 10 06 20 30 00 160-99 P co CCGG 79.250 -999.990 ... V2 2009 10 19 11 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 285081 MLO 2009 10 13 20 05 00 6052-66 S co CCGG 79.890 -999.990 S.. R5 2009 10 20 13 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 285254 MLO 2009 10 13 20 05 00 6071-66 S co CCGG 80.570 -999.990 S.. R5 2009 10 20 13 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 285255 MLO 2009 10 13 20 25 00 1321-99 P co CCGG 84.420 -999.990 ... R5 2009 10 20 13 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 285253 MLO 2009 10 13 20 25 00 264-99 P co CCGG 82.560 -999.990 ... R5 2009 10 20 13 40 00 19.5362 -155.5763 3402.00 3397.00 5.00 285252 MLO 2009 10 20 20 02 00 3753-99 S co CCGG 68.430 -999.990 S.. V2 2009 11 05 14 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 285667 MLO 2009 10 20 20 02 00 4564-99 S co CCGG 68.340 -999.990 S.. V2 2009 11 05 15 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 285668 MLO 2009 10 20 20 31 00 1410-99 P co CCGG 73.430 -999.990 ... V2 2009 11 05 14 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 285665 MLO 2009 10 20 20 31 00 2979-99 P co CCGG 74.470 -999.990 ... V2 2009 11 05 14 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 285666 MLO 2009 10 27 20 06 00 6479-66 S co CCGG 71.830 -999.990 S.. V2 2009 11 16 12 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 285933 MLO 2009 10 27 20 06 00 6480-66 S co CCGG 71.910 -999.990 S.. V2 2009 11 16 12 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 285934 MLO 2009 10 27 20 25 00 4845-99 P co CCGG 74.160 -999.990 ... V2 2009 11 16 12 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 285935 MLO 2009 10 27 20 25 00 4846-99 P co CCGG 74.330 -999.990 ... V2 2009 11 16 13 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 285936 MLO 2009 11 03 20 00 00 3985-99 S co CCGG 74.250 -999.990 S.. V2 2009 11 19 16 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 286395 MLO 2009 11 03 20 00 00 3986-99 S co CCGG 74.330 -999.990 S.. V2 2009 11 19 16 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 286396 MLO 2009 11 03 20 27 00 4825-99 P co CCGG 77.650 -999.990 ... V2 2009 11 19 17 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 286393 MLO 2009 11 03 20 27 00 4826-99 P co CCGG 78.550 -999.990 ... V2 2009 11 19 17 28 00 19.5362 -155.5763 3402.00 3397.00 5.00 286394 MLO 2009 11 10 20 02 00 6184-66 S co CCGG 80.130 -999.990 S.. V2 2009 12 02 17 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 286816 MLO 2009 11 10 20 02 00 6779-66 S co CCGG 80.020 -999.990 S.. V2 2009 12 02 17 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 286817 MLO 2009 11 10 20 14 00 4399-99 P co CCGG 81.680 -999.990 ... V2 2009 12 03 10 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 286814 MLO 2009 11 10 20 14 00 4643-99 P co CCGG 81.080 -999.990 ... V2 2009 12 03 10 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 286815 MLO 2009 11 17 20 15 00 25-99 S co CCGG 94.050 -999.990 S.. V2 2009 12 07 09 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 287120 MLO 2009 11 17 20 15 00 509-99 S co CCGG 94.130 -999.990 S.. V2 2009 12 07 09 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 287121 MLO 2009 11 17 20 32 00 1432-99 P co CCGG 87.330 -999.990 ... V2 2009 12 07 10 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 287118 MLO 2009 11 17 20 32 00 4334-99 P co CCGG 87.900 -999.990 ... V2 2009 12 07 10 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 287119 MLO 2009 11 23 20 02 00 6379-66 P co CCGG 86.280 -999.990 ... V2 2009 12 09 15 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 287572 MLO 2009 11 23 20 02 00 6917-66 P co CCGG 87.220 -999.990 ... V2 2009 12 09 15 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 287573 MLO 2009 11 23 20 16 00 2789-99 S co CCGG 82.860 -999.990 S.. V2 2009 12 09 16 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 287575 MLO 2009 11 23 20 16 00 649-99 S co CCGG 83.240 -999.990 S.. V2 2009 12 09 16 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 287574 MLO 2009 12 01 20 10 00 2597-99 S co CCGG 89.190 -999.990 S.. V2 2010 01 19 14 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 288517 MLO 2009 12 01 20 10 00 2598-99 S co CCGG 88.810 -999.990 S.. V2 2010 01 19 14 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 288518 MLO 2009 12 01 20 28 00 2305-99 P co CCGG 90.970 -999.990 ... V2 2010 01 19 14 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 288527 MLO 2009 12 01 20 28 00 2306-99 P co CCGG 91.060 -999.990 ... V2 2010 01 19 14 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 288528 MLO 2009 12 09 20 20 00 3303-99 P co CCGG 81.360 -999.990 ... V2 2010 02 03 15 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 289375 MLO 2009 12 09 20 20 00 3304-99 P co CCGG 81.920 -999.990 ... V2 2010 02 03 15 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 289376 MLO 2009 12 09 20 26 00 6571-66 S co CCGG 80.170 -999.990 S.. V2 2010 02 03 14 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 289377 MLO 2009 12 09 20 26 00 6572-66 S co CCGG 80.650 -999.990 S.. V2 2010 02 03 14 59 00 19.5362 -155.5763 3437.00 3397.00 40.00 289378 MLO 2009 12 15 20 01 00 4209-99 S co CCGG 81.140 -999.990 S.. V2 2010 01 26 10 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 288848 MLO 2009 12 15 20 01 00 4655-99 S co CCGG 81.360 -999.990 S.. V2 2010 01 26 10 29 00 19.5362 -155.5763 3437.00 3397.00 40.00 288849 MLO 2009 12 15 20 27 00 1958-99 P co CCGG 80.280 -999.990 ... V2 2010 01 26 09 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 288846 MLO 2009 12 15 20 27 00 3567-99 P co CCGG 79.480 -999.990 ... V2 2010 01 26 09 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 288847 MLO 2009 12 23 20 09 00 4167-99 S co CCGG 103.440 -999.990 S.. V2 2010 03 03 16 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 290782 MLO 2009 12 23 20 09 00 4179-99 S co CCGG 103.700 -999.990 S.. V2 2010 03 03 16 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 290783 MLO 2009 12 23 20 27 00 1449-99 P co CCGG 106.350 -999.990 ... V2 2010 03 03 16 18 00 19.5362 -155.5763 3402.00 3397.00 5.00 290785 MLO 2009 12 23 20 27 00 2629-99 P co CCGG 105.980 -999.990 ... V2 2010 03 03 16 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 290784 MLO 2009 12 29 20 06 00 3108-99 S co CCGG 100.680 -999.990 S.. V2 2010 01 27 15 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 289116 MLO 2009 12 29 20 06 00 6249-66 S co CCGG 100.090 -999.990 S.. V2 2010 01 27 15 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 289115 MLO 2009 12 29 20 19 00 2763-99 P co CCGG 98.750 -999.990 ... V2 2010 01 27 15 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 289117 MLO 2009 12 29 20 19 00 3258-99 P co CCGG 99.490 -999.990 ... V2 2010 01 27 15 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 289118 MLO 2010 01 05 20 06 00 3674-99 S co CCGG 95.910 -999.990 S.. V2 2010 02 04 16 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 289398 MLO 2010 01 05 20 06 00 869-99 S co CCGG 96.370 -999.990 S.. V2 2010 02 04 16 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 289397 MLO 2010 01 05 20 31 00 1328-99 P co CCGG 97.040 -999.990 ... V2 2010 02 04 16 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 289396 MLO 2010 01 05 20 31 00 4005-99 P co CCGG 96.600 -999.990 ... V2 2010 02 04 16 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 289395 MLO 2010 01 12 20 06 00 4547-99 S co CCGG 85.340 -999.990 S.. V2 2010 02 09 09 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 289633 MLO 2010 01 12 20 06 00 618-99 S co CCGG 85.810 -999.990 S.. V2 2010 02 09 09 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 289632 MLO 2010 01 12 20 18 00 3863-99 P co CCGG 84.610 -999.990 ... V2 2010 02 08 17 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 289630 MLO 2010 01 12 20 18 00 4116-99 P co CCGG 85.730 -999.990 ... V2 2010 02 08 17 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 289631 MLO 2010 01 20 20 18 00 393-99 S co CCGG 91.720 -999.990 S.. V2 2010 02 17 15 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 290123 MLO 2010 01 20 20 18 00 394-99 S co CCGG 91.370 -999.990 S.. V2 2010 02 17 16 09 00 19.5362 -155.5763 3437.00 3397.00 40.00 290124 MLO 2010 01 20 20 40 00 2239-99 P co CCGG 95.490 -999.990 ... V2 2010 02 17 15 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 290121 MLO 2010 01 20 20 40 00 2240-99 P co CCGG 96.350 -999.990 ... V2 2010 02 17 15 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 290122 MLO 2010 01 26 20 07 00 4531-99 S co CCGG 75.930 -999.990 S.. V2 2010 02 25 11 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 290509 MLO 2010 01 26 20 07 00 4532-99 S co CCGG 76.540 -999.990 S.. V2 2010 02 25 12 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 290510 MLO 2010 01 26 20 24 00 2013-99 P co CCGG 77.180 -999.990 ... V2 2010 02 25 12 15 00 19.5362 -155.5763 3402.00 3397.00 5.00 290511 MLO 2010 01 26 20 24 00 2014-99 P co CCGG 77.630 -999.990 ... V2 2010 02 25 12 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 290512 MLO 2010 02 02 20 06 00 2919-99 S co CCGG 143.040 -999.990 S.. V2 2010 03 02 17 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 291012 MLO 2010 02 02 20 06 00 2920-99 S co CCGG 143.850 -999.990 S.. V2 2010 03 02 17 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 291013 MLO 2010 02 02 20 25 00 3473-99 P co CCGG 151.600 -999.990 .X. V2 2010 03 03 08 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 291010 MLO 2010 02 02 20 25 00 3474-99 P co CCGG 149.770 -999.990 .X. V2 2010 03 03 09 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 291011 MLO 2010 02 09 20 05 00 6839-66 S co CCGG 152.620 -999.990 S.. V2 2010 03 09 13 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 291442 MLO 2010 02 09 20 05 00 6840-66 S co CCGG 153.760 -999.990 S.. V2 2010 03 09 13 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 291443 MLO 2010 02 09 20 25 00 5105-99 P co CCGG 147.340 -999.990 .X. V2 2010 03 09 14 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 291440 MLO 2010 02 09 20 25 00 5106-99 P co CCGG 148.300 -999.990 .X. V2 2010 03 09 14 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 291441 MLO 2010 02 16 20 12 00 3413-99 S co CCGG 86.210 -999.990 S.. V2 2010 03 15 15 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 291708 MLO 2010 02 16 20 12 00 3414-99 S co CCGG 86.590 -999.990 S.. V2 2010 03 15 15 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 291709 MLO 2010 02 16 20 32 00 4197-99 P co CCGG 91.460 -999.990 ... V2 2010 03 16 09 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 291706 MLO 2010 02 16 20 32 00 4198-99 P co CCGG 91.130 -999.990 ... V2 2010 03 16 10 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 291707 MLO 2010 02 23 20 02 00 245-99 S co CCGG 89.280 -999.990 S.. V2 2010 03 22 12 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 292065 MLO 2010 02 23 20 02 00 246-99 S co CCGG 89.480 -999.990 S.. V2 2010 03 22 12 29 00 19.5362 -155.5763 3437.00 3397.00 40.00 292066 MLO 2010 02 23 20 19 00 3179-99 P co CCGG 100.300 -999.990 ... V2 2010 03 22 12 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 292063 MLO 2010 02 23 20 19 00 3180-99 P co CCGG 100.250 -999.990 ... V2 2010 03 22 13 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 292064 MLO 2010 03 02 20 14 00 4383-99 S co CCGG 186.740 -999.990 S.. V2 2010 03 29 14 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 292534 MLO 2010 03 02 20 14 00 4384-99 S co CCGG 186.920 -999.990 S.. V2 2010 03 29 14 29 00 19.5362 -155.5763 3437.00 3397.00 40.00 292535 MLO 2010 03 02 20 30 00 335-99 P co CCGG 206.950 -999.990 .X. V2 2010 03 29 13 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 292532 MLO 2010 03 02 20 30 00 336-99 P co CCGG 208.150 -999.990 .X. V2 2010 03 29 13 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 292533 MLO 2010 03 09 20 06 00 6255-66 S co CCGG -999.990 -999.990 *.. R5 2010 04 02 15 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 292907 MLO 2010 03 09 20 06 00 6255-66 S co CCGG 123.070 -999.990 S.. R5 2010 04 05 11 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 292907 MLO 2010 03 09 20 06 00 6256-66 S co CCGG 122.940 -999.990 S.. R5 2010 04 02 15 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 292908 MLO 2010 03 09 20 29 00 2511-99 P co CCGG 125.190 -999.990 ... V2 2010 04 05 10 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 292905 MLO 2010 03 09 20 29 00 2512-99 P co CCGG 126.540 -999.990 ... V2 2010 04 05 10 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 292906 MLO 2010 03 16 20 07 00 5119-99 S co CCGG 128.360 -999.990 S.. V2 2010 04 06 16 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 293093 MLO 2010 03 16 20 07 00 5120-99 S co CCGG 128.580 -999.990 S.. V2 2010 04 06 16 29 00 19.5362 -155.5763 3437.00 3397.00 40.00 293094 MLO 2010 03 16 20 24 00 5115-99 P co CCGG 131.920 -999.990 ... V2 2010 04 07 10 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 293091 MLO 2010 03 16 20 24 00 5116-99 P co CCGG 132.760 -999.990 ... V2 2010 04 07 11 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 293092 MLO 2010 03 23 20 13 00 6899-66 S co CCGG 112.420 -999.990 S.. R5 2010 04 09 13 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 293473 MLO 2010 03 23 20 13 00 6900-66 S co CCGG 108.510 -999.990 S.. R5 2010 04 09 13 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 293474 MLO 2010 03 23 20 29 00 4505-99 P co CCGG 138.330 -999.990 ... R5 2010 04 09 13 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 293471 MLO 2010 03 23 20 29 00 4506-99 P co CCGG 123.840 -999.990 ... R5 2010 04 09 14 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 293472 MLO 2010 03 30 20 12 00 1656-99 S co CCGG 106.670 -999.990 S.. V2 2010 04 16 09 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 293998 MLO 2010 03 30 20 12 00 3812-99 S co CCGG 104.550 -999.990 S.. V2 2010 04 16 10 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 293999 MLO 2010 03 30 20 37 00 3369-99 P co CCGG 111.000 -999.990 ... V2 2010 04 15 14 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 293996 MLO 2010 03 30 20 37 00 4364-99 P co CCGG 108.700 -999.990 ... V2 2010 04 15 14 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 293997 MLO 2010 04 07 19 55 00 1778-99 P co CCGG 120.370 -999.990 ... V2 2010 04 19 12 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 294406 MLO 2010 04 07 19 55 00 6596-66 P co CCGG 119.470 -999.990 ... V2 2010 04 19 13 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 294407 MLO 2010 04 07 20 18 00 3821-99 S co CCGG 119.890 -999.990 S.. V2 2010 04 19 13 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 294408 MLO 2010 04 07 20 18 00 4782-99 S co CCGG 119.910 -999.990 S.. V2 2010 04 19 13 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 294409 MLO 2010 04 13 19 59 00 3519-99 S co CCGG 120.720 -999.990 S.. R5 2010 04 22 11 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 295050 MLO 2010 04 13 19 59 00 6631-66 S co CCGG 121.080 -999.990 S.. R5 2010 04 22 11 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 295051 MLO 2010 04 13 20 19 00 2658-99 P co CCGG 122.540 -999.990 ... R5 2010 04 22 11 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 295048 MLO 2010 04 13 20 19 00 3424-99 P co CCGG 123.420 -999.990 ... R5 2010 04 22 12 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 295049 MLO 2010 04 20 20 14 00 4184-99 S co CCGG 178.610 -999.990 S.. R5 2010 04 30 14 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 295665 MLO 2010 04 20 20 14 00 4908-99 S co CCGG 176.710 -999.990 S.. R5 2010 04 30 14 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 295666 MLO 2010 04 20 20 30 00 155-99 P co CCGG 182.200 -999.990 .X. R5 2010 04 30 13 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 295663 MLO 2010 04 20 20 30 00 3345-99 P co CCGG 183.870 -999.990 .X. R5 2010 04 30 14 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 295664 MLO 2010 04 28 19 40 00 1533-99 S co CCGG 116.490 -999.990 S.. R5 2010 05 14 14 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 296133 MLO 2010 04 28 19 40 00 2985-99 S co CCGG 116.850 -999.990 S.. R5 2010 05 14 14 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 296134 MLO 2010 04 28 19 58 00 4296-99 P co CCGG 116.140 -999.990 ... R5 2010 05 14 15 12 00 19.5362 -155.5763 3402.00 3397.00 5.00 296136 MLO 2010 04 28 19 58 00 4411-99 P co CCGG 115.540 -999.990 ... R5 2010 05 14 14 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 296135 MLO 2010 05 04 20 19 00 6061-66 S co CCGG 107.400 -999.990 S.. R5 2010 05 24 12 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 296525 MLO 2010 05 04 20 19 00 6062-66 S co CCGG 107.600 -999.990 S.. R5 2010 05 24 13 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 296526 MLO 2010 05 04 20 40 00 469-99 P co CCGG 110.310 -999.990 ... R5 2010 05 24 13 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 296523 MLO 2010 05 04 20 40 00 470-99 P co CCGG 109.440 -999.990 ... R5 2010 05 24 13 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 296524 MLO 2010 05 11 20 07 00 3367-99 S co CCGG 100.860 -999.990 S.. V2 2010 05 26 13 58 00 19.5362 -155.5763 3437.00 3397.00 40.00 296825 MLO 2010 05 11 20 07 00 3368-99 S co CCGG 100.510 -999.990 S.. V2 2010 05 26 14 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 296826 MLO 2010 05 11 20 25 00 2015-99 P co CCGG 105.470 -999.990 ... V2 2010 05 26 14 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 296823 MLO 2010 05 11 20 25 00 2016-99 P co CCGG 106.260 -999.990 ... V2 2010 05 26 14 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 296824 MLO 2010 05 18 20 02 00 3499-99 S co CCGG 105.900 -999.990 S.. V2 2010 05 28 12 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 297231 MLO 2010 05 18 20 02 00 3500-99 S co CCGG 106.120 -999.990 S.. V2 2010 05 28 12 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 297232 MLO 2010 05 18 20 24 00 441-99 P co CCGG 111.080 -999.990 ... V2 2010 05 28 11 37 00 19.5362 -155.5763 3402.00 3397.00 5.00 297229 MLO 2010 05 18 20 24 00 442-99 P co CCGG 110.950 -999.990 ... V2 2010 05 28 11 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 297230 MLO 2010 05 26 20 22 00 2271-99 P co CCGG 112.150 -999.990 ... V2 2010 06 04 09 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 297654 MLO 2010 05 26 20 22 00 2463-99 P co CCGG 111.400 -999.990 ... V2 2010 06 04 10 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 297655 MLO 2010 05 26 22 12 00 3889-99 S co CCGG 127.870 -999.990 S.. V2 2010 06 04 09 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 297656 MLO 2010 05 26 22 12 00 3890-99 S co CCGG 125.270 -999.990 S.. V2 2010 06 04 09 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 297657 MLO 2010 06 01 20 22 00 1682-99 S co CCGG 98.380 -999.990 S.. R5 2010 06 10 16 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 298090 MLO 2010 06 01 20 22 00 1769-99 S co CCGG 98.790 -999.990 S.. R5 2010 06 10 16 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 298089 MLO 2010 06 01 20 43 00 4556-99 P co CCGG 96.840 -999.990 ... R5 2010 06 10 15 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 298088 MLO 2010 06 08 20 18 00 2755-99 S co CCGG 89.430 -999.990 S.. V2 2010 06 17 12 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 298473 MLO 2010 06 08 20 18 00 2756-99 S co CCGG 89.900 -999.990 S.. V2 2010 06 17 12 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 298474 MLO 2010 06 08 20 39 00 1269-99 P co CCGG 91.370 -999.990 ... V2 2010 06 17 11 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 298471 MLO 2010 06 08 20 39 00 1270-99 P co CCGG 91.090 -999.990 ... V2 2010 06 17 12 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 298472 MLO 2010 06 15 20 19 00 1195-99 S co CCGG 72.490 -999.990 S.. R5 2010 06 25 14 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 298808 MLO 2010 06 15 20 19 00 6258-66 S co CCGG 71.950 -999.990 S.. R5 2010 06 25 14 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 298809 MLO 2010 06 15 20 38 00 4831-99 P co CCGG 73.980 -999.990 ... R5 2010 06 25 14 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 298806 MLO 2010 06 15 20 38 00 4971-99 P co CCGG 74.280 -999.990 ... R5 2010 06 25 14 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 298807 MLO 2010 06 22 20 15 00 1473-99 S co CCGG 72.930 -999.990 S.. R5 2010 06 30 14 09 00 19.5362 -155.5763 3437.00 3397.00 40.00 299356 MLO 2010 06 22 20 15 00 1474-99 S co CCGG 73.060 -999.990 S.. R5 2010 06 30 14 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 299357 MLO 2010 06 22 20 40 00 2639-99 P co CCGG 73.810 -999.990 ... R5 2010 06 30 13 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 299354 MLO 2010 06 22 20 40 00 2640-99 P co CCGG 73.800 -999.990 ... R5 2010 06 30 13 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 299355 MLO 2010 06 29 20 16 00 987-99 S co CCGG 67.310 -999.990 S.. V2 2010 07 09 15 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 299776 MLO 2010 06 29 20 16 00 988-99 S co CCGG 67.310 -999.990 S.. V2 2010 07 09 15 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 299777 MLO 2010 06 29 20 53 00 3621-99 P co CCGG 70.230 -999.990 ... R5 2010 07 09 15 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 299778 MLO 2010 06 29 20 53 00 3622-99 P co CCGG 69.000 -999.990 ... R5 2010 07 09 15 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 299779 MLO 2010 07 06 20 15 00 6899-66 S co CCGG 71.150 -999.990 S.. V2 2010 07 13 14 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 300112 MLO 2010 07 06 20 15 00 6900-66 S co CCGG 70.490 -999.990 S.. V2 2010 07 13 14 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 300113 MLO 2010 07 06 20 38 00 339-99 P co CCGG 74.890 -999.990 ... V2 2010 07 13 14 37 00 19.5362 -155.5763 3402.00 3397.00 5.00 300110 MLO 2010 07 06 20 38 00 340-99 P co CCGG 77.950 -999.990 ... V2 2010 07 13 14 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 300111 MLO 2010 07 13 20 15 00 3053-99 S co CCGG 75.870 -999.990 S.. V2 2010 07 23 11 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 300555 MLO 2010 07 13 20 15 00 3054-99 S co CCGG 75.120 -999.990 S.. V2 2010 07 23 12 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 300556 MLO 2010 07 13 20 38 00 809-99 P co CCGG 79.200 -999.990 ... V2 2010 07 23 12 15 00 19.5362 -155.5763 3402.00 3397.00 5.00 300553 MLO 2010 07 13 20 38 00 810-99 P co CCGG 81.110 -999.990 ... V2 2010 07 23 12 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 300554 MLO 2010 07 20 20 14 00 2910-99 S co CCGG 71.640 -999.990 S.. V2 2010 08 02 11 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 300942 MLO 2010 07 20 20 14 00 3600-99 S co CCGG 71.120 -999.990 S.. V2 2010 08 02 11 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 300943 MLO 2010 07 20 20 33 00 4911-99 P co CCGG 68.590 -999.990 ... V2 2010 08 02 11 56 00 19.5362 -155.5763 3402.00 3397.00 5.00 300940 MLO 2010 07 20 20 33 00 5151-99 P co CCGG 68.850 -999.990 ... V2 2010 08 02 12 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 300941 MLO 2010 07 27 20 14 00 4620-99 S co CCGG 62.910 -999.990 S.. R5 2010 08 03 11 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 301155 MLO 2010 07 27 20 14 00 6917-66 S co CCGG 63.060 -999.990 S.. R5 2010 08 03 11 59 00 19.5362 -155.5763 3437.00 3397.00 40.00 301156 MLO 2010 07 27 20 41 00 2178-99 P co CCGG 66.700 -999.990 P.. R5 2010 08 03 12 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 301153 MLO 2010 07 27 20 41 00 2338-99 P co CCGG 70.160 -999.990 P.. R5 2010 08 03 12 28 00 19.5362 -155.5763 3402.00 3397.00 5.00 301154 MLO 2010 08 03 20 12 00 2358-99 S co CCGG 74.970 -999.990 S.. R5 2010 08 12 10 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 301561 MLO 2010 08 03 20 12 00 6395-66 S co CCGG 75.180 -999.990 S.. R5 2010 08 12 10 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 301560 MLO 2010 08 03 20 36 00 456-99 P co CCGG 76.550 -999.990 ... R5 2010 08 12 09 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 301558 MLO 2010 08 03 20 36 00 4899-99 P co CCGG 77.920 -999.990 ... R5 2010 08 12 09 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 301559 MLO 2010 08 10 20 13 00 1169-99 S co CCGG 61.610 -999.990 S.. R5 2010 08 18 12 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 302044 MLO 2010 08 10 20 13 00 1170-99 S co CCGG 62.840 -999.990 S.. R5 2010 08 18 13 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 302045 MLO 2010 08 10 20 35 00 4559-99 P co CCGG 66.930 -999.990 ... R5 2010 08 18 13 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 302042 MLO 2010 08 10 20 35 00 4560-99 P co CCGG 68.560 -999.990 ... R5 2010 08 18 13 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 302043 MLO 2010 08 17 20 04 00 177-99 S co CCGG 66.220 -999.990 S.. R5 2010 08 24 12 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 302503 MLO 2010 08 17 20 04 00 178-99 S co CCGG 66.150 -999.990 S.. R5 2010 08 24 12 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 302504 MLO 2010 08 17 20 34 00 3127-99 P co CCGG 66.620 -999.990 P.. R5 2010 08 24 13 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 302505 MLO 2010 08 17 20 34 00 3128-99 P co CCGG 69.840 -999.990 P.. R5 2010 08 24 13 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 302506 MLO 2010 08 24 20 10 00 5145-99 S co CCGG 95.640 -999.990 S.. V2 2010 09 02 15 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 303002 MLO 2010 08 24 20 10 00 5146-99 S co CCGG 95.710 -999.990 S.. V2 2010 09 02 15 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 303003 MLO 2010 08 24 20 42 00 2711-99 P co CCGG 92.500 -999.990 P.. V2 2010 09 02 14 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 303000 MLO 2010 08 24 20 42 00 2712-99 P co CCGG 89.060 -999.990 P.. V2 2010 09 02 14 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 303001 MLO 2010 08 31 20 02 00 6195-66 S co CCGG 65.050 -999.990 S.. V2 2010 09 10 13 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 303494 MLO 2010 08 31 20 02 00 785-99 S co CCGG 65.980 -999.990 S.. V2 2010 09 10 13 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 303493 MLO 2010 08 31 20 35 00 2182-99 P co CCGG 71.310 -999.990 ... V2 2010 09 10 13 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 303491 MLO 2010 08 31 20 35 00 3968-99 P co CCGG 69.540 -999.990 ... V2 2010 09 10 13 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 303492 MLO 2010 09 07 20 04 00 1827-99 S co CCGG 86.780 -999.990 S.. V2 2010 09 14 11 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 303713 MLO 2010 09 07 20 04 00 1828-99 S co CCGG 87.310 -999.990 S.. V2 2010 09 14 11 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 303714 MLO 2010 09 07 20 36 00 3211-99 P co CCGG 88.940 -999.990 ... V2 2010 09 14 11 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 303711 MLO 2010 09 07 20 36 00 3212-99 P co CCGG 90.300 -999.990 ... V2 2010 09 14 11 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 303712 MLO 2010 09 14 20 05 00 1899-99 S co CCGG 68.040 -999.990 S.. R5 2010 09 23 17 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 304281 MLO 2010 09 14 20 05 00 1900-99 S co CCGG 69.820 -999.990 S.. R5 2010 09 23 17 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 304282 MLO 2010 09 14 20 31 00 5195-99 P co CCGG 71.250 -999.990 ... V2 2010 09 23 16 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 304279 MLO 2010 09 14 20 31 00 5196-99 P co CCGG 73.040 -999.990 ... V2 2010 09 23 16 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 304280 MLO 2010 09 21 20 14 00 1765-99 S co CCGG 77.140 -999.990 S.. V2 2010 09 28 15 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 304678 MLO 2010 09 21 20 14 00 2879-99 S co CCGG 77.370 -999.990 S.. V2 2010 09 28 15 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 304679 MLO 2010 09 21 20 38 00 3604-99 P co CCGG 82.110 -999.990 ... V2 2010 09 28 10 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 304654 MLO 2010 09 21 20 38 00 570-99 P co CCGG 81.160 -999.990 ... V2 2010 09 28 10 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 304655 MLO 2010 09 28 20 12 00 236-99 S co CCGG 84.950 -999.990 S.. V2 2010 10 07 09 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 305102 MLO 2010 09 28 20 12 00 688-99 S co CCGG 85.470 -999.990 S.. V2 2010 10 07 10 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 305103 MLO 2010 09 28 20 45 00 2256-99 P co CCGG 90.120 -999.990 P.. V2 2010 10 07 10 22 00 19.5362 -155.5763 3402.00 3397.00 5.00 305100 MLO 2010 09 28 20 45 00 3888-99 P co CCGG 94.310 -999.990 P.. V2 2010 10 07 10 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 305101 MLO 2010 10 05 20 14 00 6089-66 S co CCGG 76.430 -999.990 S.. V2 2010 10 13 16 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 305581 MLO 2010 10 05 20 14 00 6090-66 S co CCGG 75.730 -999.990 S.. V2 2010 10 13 16 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 305582 MLO 2010 10 05 20 35 00 3187-99 P co CCGG 78.580 -999.990 ... V2 2010 10 13 16 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 305583 MLO 2010 10 05 20 35 00 3188-99 P co CCGG 78.150 -999.990 ... V2 2010 10 13 17 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 305584 MLO 2010 10 12 20 15 00 2281-99 S co CCGG 81.250 -999.990 S.. V2 2010 10 19 10 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 305798 MLO 2010 10 12 20 15 00 300-99 S co CCGG 81.550 -999.990 S.. V2 2010 10 19 10 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 305799 MLO 2010 10 12 20 40 00 1233-99 P co CCGG 86.100 -999.990 ... V2 2010 10 19 11 12 00 19.5362 -155.5763 3402.00 3397.00 5.00 305784 MLO 2010 10 12 20 40 00 3141-99 P co CCGG 88.530 -999.990 ... V2 2010 10 19 11 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 305785 MLO 2010 10 19 20 13 00 2567-99 S co CCGG 72.760 -999.990 S.. V2 2010 10 26 10 09 00 19.5362 -155.5763 3437.00 3397.00 40.00 306269 MLO 2010 10 19 20 13 00 3000-99 S co CCGG 72.790 -999.990 S.. V2 2010 10 26 10 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 306270 MLO 2010 10 19 20 39 00 1148-99 P co CCGG 76.220 -999.990 ... V2 2010 10 26 09 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 306267 MLO 2010 10 19 20 39 00 1681-99 P co CCGG 77.160 -999.990 ... V2 2010 10 26 09 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 306268 MLO 2010 10 26 20 12 00 3813-99 S co CCGG 87.220 -999.990 S.. V2 2010 11 02 12 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 306772 MLO 2010 10 26 20 12 00 3814-99 S co CCGG 85.860 -999.990 S.. V2 2010 11 02 12 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 306773 MLO 2010 10 26 20 39 00 2787-99 P co CCGG 86.930 -999.990 ... V2 2010 11 02 10 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 306770 MLO 2010 10 26 20 39 00 2788-99 P co CCGG 87.140 -999.990 ... V2 2010 11 02 10 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 306771 MLO 2010 11 02 20 13 00 335-99 S co CCGG 91.230 -999.990 S.. R5 2010 11 11 12 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 307287 MLO 2010 11 02 20 13 00 336-99 S co CCGG 91.210 -999.990 S.. R5 2010 11 11 12 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 307288 MLO 2010 11 02 20 34 00 3361-99 P co CCGG 96.530 -999.990 ... R5 2010 11 11 12 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 307285 MLO 2010 11 02 20 34 00 3362-99 P co CCGG 99.440 -999.990 ... R5 2010 11 11 12 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 307286 MLO 2010 11 09 20 11 00 2577-99 S co CCGG 107.160 -999.990 S.. R5 2010 11 18 12 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 307973 MLO 2010 11 09 20 11 00 2578-99 S co CCGG 106.030 -999.990 S.. R5 2010 11 18 12 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 307974 MLO 2010 11 09 20 39 00 4499-99 P co CCGG 101.690 -999.990 ... R5 2010 11 18 12 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 307976 MLO 2010 11 09 20 39 00 4500-99 P co CCGG 101.670 -999.990 ... R5 2010 11 18 13 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 307975 MLO 2010 11 16 20 15 00 1101-99 S co CCGG 81.750 -999.990 S.. R5 2010 11 30 15 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 308182 MLO 2010 11 16 20 15 00 6528-66 S co CCGG 82.140 -999.990 S.. R5 2010 11 30 14 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 308181 MLO 2010 11 16 20 39 00 1118-99 P co CCGG 83.270 -999.990 ... R5 2010 11 30 15 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 308180 MLO 2010 11 16 20 39 00 2394-99 P co CCGG 82.950 -999.990 ... R5 2010 11 30 15 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 308179 MLO 2010 11 23 20 14 00 4911-99 S co CCGG 82.150 -999.990 S.. R5 2010 12 09 15 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 308444 MLO 2010 11 23 20 14 00 5151-99 S co CCGG 82.220 -999.990 S.. R5 2010 12 09 15 32 00 19.5362 -155.5763 3437.00 3397.00 40.00 308445 MLO 2010 11 23 20 38 00 4725-99 P co CCGG 87.420 -999.990 ... R5 2010 12 09 14 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 308442 MLO 2010 11 23 20 38 00 4770-99 P co CCGG 88.150 -999.990 ... R5 2010 12 09 15 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 308443 MLO 2010 11 30 20 13 00 3869-99 S co CCGG 89.610 -999.990 S.. R5 2010 12 09 11 50 00 19.5362 -155.5763 3437.00 3397.00 40.00 308951 MLO 2010 11 30 20 13 00 3870-99 S co CCGG 89.570 -999.990 S.. R5 2010 12 09 12 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 308952 MLO 2010 11 30 20 42 00 1851-99 P co CCGG 88.830 -999.990 ... R5 2010 12 09 12 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 308949 MLO 2010 11 30 20 42 00 1852-99 P co CCGG 89.970 -999.990 ... R5 2010 12 09 12 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 308950 MLO 2010 12 07 20 06 00 1808-99 S co CCGG 96.960 -999.990 S.. V2 2010 12 23 12 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 309541 MLO 2010 12 07 20 06 00 3871-99 S co CCGG 96.420 -999.990 S.. V2 2010 12 23 12 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 309542 MLO 2010 12 07 20 36 00 2565-99 P co CCGG 97.500 -999.990 ... V2 2010 12 23 13 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 309540 MLO 2010 12 07 20 36 00 557-99 P co CCGG 98.610 -999.990 ... V2 2010 12 23 13 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 309539 MLO 2010 12 14 20 15 00 205-99 S co CCGG 67.460 -999.990 S.. R5 2010 12 28 13 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 309947 MLO 2010 12 14 20 15 00 206-99 S co CCGG 66.820 -999.990 S.. R5 2010 12 28 13 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 309948 MLO 2010 12 14 20 40 00 779-99 P co CCGG 68.490 -999.990 ... R5 2010 12 28 12 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 309949 MLO 2010 12 14 20 40 00 780-99 P co CCGG 68.090 -999.990 ... R5 2010 12 28 13 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 309950 MLO 2010 12 21 20 04 00 5021-99 S co CCGG 92.480 -999.990 S.. V2 2010 12 30 11 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 310078 MLO 2010 12 21 20 04 00 5144-99 S co CCGG 92.330 -999.990 S.. V2 2010 12 30 11 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 310079 MLO 2010 12 21 20 32 00 311-99 P co CCGG 89.490 -999.990 ... V2 2010 12 30 10 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 310076 MLO 2010 12 21 20 32 00 4135-99 P co CCGG 90.300 -999.990 ... V2 2010 12 30 11 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 310077 MLO 2010 12 28 20 20 00 5389-99 S co CCGG 66.460 -999.990 S.. R5 2011 01 07 14 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 310604 MLO 2010 12 28 20 20 00 5390-99 S co CCGG 66.490 -999.990 S.. R5 2011 01 07 15 09 00 19.5362 -155.5763 3437.00 3397.00 40.00 310605 MLO 2010 12 28 20 58 00 5387-99 P co CCGG 68.830 -999.990 ... R5 2011 01 07 15 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 310606 MLO 2010 12 28 20 58 00 5388-99 P co CCGG 68.700 -999.990 ... R5 2011 01 07 15 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 310607 MLO 2011 01 04 20 14 00 3211-99 S co CCGG 115.060 -999.990 S.. R5 2011 01 12 09 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 310866 MLO 2011 01 04 20 14 00 3212-99 S co CCGG 115.780 -999.990 S.. R5 2011 01 12 09 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 310867 MLO 2011 01 04 20 45 00 2631-99 P co CCGG 112.510 -999.990 ... R5 2011 01 12 09 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 310864 MLO 2011 01 04 20 45 00 2632-99 P co CCGG 113.170 -999.990 ... R5 2011 01 12 09 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 310865 MLO 2011 01 11 20 11 00 675-99 S co CCGG 92.710 -999.990 S.. V2 2011 01 19 13 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 311076 MLO 2011 01 11 20 11 00 676-99 S co CCGG 91.930 -999.990 S.. V2 2011 01 19 13 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 311077 MLO 2011 01 11 20 36 00 1783-99 P co CCGG 92.980 -999.990 ... V2 2011 01 19 13 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 311074 MLO 2011 01 11 20 36 00 1784-99 P co CCGG 94.070 -999.990 ... V2 2011 01 19 14 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 311075 MLO 2011 01 18 20 14 00 4063-99 S co CCGG 123.090 -999.990 S.. V2 2011 01 28 13 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 311790 MLO 2011 01 18 20 14 00 4064-99 S co CCGG 121.950 -999.990 S.. V2 2011 01 28 14 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 311791 MLO 2011 01 18 20 45 00 2527-99 P co CCGG 134.590 -999.990 .X. V2 2011 01 28 13 22 00 19.5362 -155.5763 3402.00 3397.00 5.00 311792 MLO 2011 01 18 20 45 00 2528-99 P co CCGG 134.150 -999.990 .X. V2 2011 01 28 13 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 311793 MLO 2011 01 25 20 13 00 2054-99 S co CCGG 85.450 -999.990 S.. V2 2011 02 14 11 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 312210 MLO 2011 01 25 20 13 00 4753-99 S co CCGG 84.490 -999.990 S.. V2 2011 02 14 12 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 312211 MLO 2011 01 25 20 36 00 2281-99 P co CCGG 87.570 -999.990 ... V2 2011 02 14 11 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 312208 MLO 2011 01 25 20 36 00 4875-99 P co CCGG 88.590 -999.990 ... V2 2011 02 14 11 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 312209 MLO 2011 02 01 20 14 00 857-99 S co CCGG 104.370 -999.990 S.. V2 2011 02 16 15 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 312545 MLO 2011 02 01 20 14 00 858-99 S co CCGG 104.100 -999.990 S.. V2 2011 02 16 15 58 00 19.5362 -155.5763 3437.00 3397.00 40.00 312546 MLO 2011 02 01 20 43 00 3217-99 P co CCGG 109.150 -999.990 ... V2 2011 02 16 16 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 312547 MLO 2011 02 01 20 43 00 3218-99 P co CCGG 108.000 -999.990 ... V2 2011 02 16 16 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 312548 MLO 2011 02 08 20 17 00 12-99 S co CCGG 91.430 -999.990 S.. V2 2011 02 25 10 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 313091 MLO 2011 02 08 20 17 00 3812-99 S co CCGG 91.390 -999.990 S.. V2 2011 02 25 10 32 00 19.5362 -155.5763 3437.00 3397.00 40.00 313092 MLO 2011 02 08 20 49 00 1469-99 P co CCGG 92.400 -999.990 ... V2 2011 02 25 10 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 313089 MLO 2011 02 08 20 49 00 4661-99 P co CCGG 93.040 -999.990 ... V2 2011 02 25 11 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 313090 MLO 2011 02 15 20 15 00 4085-99 S co CCGG 92.340 -999.990 S.. V4 2011 03 01 15 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 313331 MLO 2011 02 15 20 15 00 4086-99 S co CCGG 91.620 -999.990 S.. V4 2011 03 01 16 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 313332 MLO 2011 02 15 20 56 00 3065-99 P co CCGG 84.140 -999.990 ... V4 2011 03 01 15 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 313329 MLO 2011 02 15 20 56 00 3066-99 P co CCGG 84.010 -999.990 ... V4 2011 03 01 15 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 313330 MLO 2011 02 22 20 17 00 315-99 S co CCGG 92.430 -999.990 S.. V2 2011 03 08 15 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 313675 MLO 2011 02 22 20 17 00 316-99 S co CCGG 92.080 -999.990 S.. V2 2011 03 08 15 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 313676 MLO 2011 02 22 20 45 00 3757-99 P co CCGG 91.700 -999.990 ... V2 2011 03 08 14 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 313677 MLO 2011 02 22 20 45 00 3758-99 P co CCGG 91.400 -999.990 ... V2 2011 03 08 15 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 313678 MLO 2011 03 01 20 13 00 3992-99 S co CCGG 108.610 -999.990 S.. V2 2011 03 11 16 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 313968 MLO 2011 03 01 20 13 00 4051-99 S co CCGG 108.780 -999.990 S.. V2 2011 03 11 16 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 313969 MLO 2011 03 01 20 48 00 1275-99 P co CCGG 108.570 -999.990 ... V2 2011 03 11 16 56 00 19.5362 -155.5763 3402.00 3397.00 5.00 313970 MLO 2011 03 01 20 48 00 733-99 P co CCGG 110.450 -999.990 ... V2 2011 03 11 17 12 00 19.5362 -155.5763 3402.00 3397.00 5.00 313971 MLO 2011 03 05 20 10 00 5021-99 S co CCGG 97.090 -999.990 S.. V4 2011 04 14 11 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 315783 MLO 2011 03 05 20 10 00 5113-99 S co CCGG 97.270 -999.990 S.. V4 2011 04 14 12 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 315784 MLO 2011 03 05 20 46 00 237-99 P co CCGG 101.370 -999.990 ... V4 2011 04 14 12 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 315781 MLO 2011 03 05 20 46 00 2691-99 P co CCGG 99.480 -999.990 ... V4 2011 04 14 12 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 315782 MLO 2011 03 09 20 12 00 277-99 S co CCGG 78.290 -999.990 S.. V2 2011 03 18 13 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 314291 MLO 2011 03 09 20 12 00 3792-99 S co CCGG 77.280 -999.990 S.. V2 2011 03 18 13 50 00 19.5362 -155.5763 3437.00 3397.00 40.00 314292 MLO 2011 03 09 20 35 00 4352-99 P co CCGG 73.420 -999.990 ... V2 2011 03 18 11 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 314290 MLO 2011 03 09 20 35 00 967-99 P co CCGG 72.900 -999.990 ... V2 2011 03 18 10 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 314289 MLO 2011 03 15 20 05 00 3154-99 S co CCGG 88.120 -999.990 S.. V2 2011 03 22 10 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 314641 MLO 2011 03 15 20 05 00 6383-66 S co CCGG 87.790 -999.990 S.. V2 2011 03 22 11 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 314642 MLO 2011 03 15 20 40 00 2336-99 P co CCGG 89.200 -999.990 ... V2 2011 03 22 10 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 314639 MLO 2011 03 15 20 40 00 4991-99 P co CCGG 88.990 -999.990 ... V2 2011 03 22 10 37 00 19.5362 -155.5763 3402.00 3397.00 5.00 314640 MLO 2011 03 22 20 10 00 965-99 S co CCGG 80.750 -999.990 S.. V2 2011 04 01 15 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 315125 MLO 2011 03 22 20 10 00 966-99 S co CCGG 80.850 -999.990 S.. V2 2011 04 01 15 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 315126 MLO 2011 03 22 20 46 00 2119-99 P co CCGG 81.550 -999.990 ... V2 2011 04 01 15 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 315127 MLO 2011 03 22 20 46 00 2120-99 P co CCGG 81.510 -999.990 ... V2 2011 04 01 15 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 315128 MLO 2011 03 29 20 13 00 2911-99 S co CCGG 124.360 -999.990 S.. V4 2011 04 07 12 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 315409 MLO 2011 03 29 20 13 00 2912-99 S co CCGG 124.910 -999.990 S.. V4 2011 04 07 13 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 315410 MLO 2011 03 29 20 38 00 4037-99 P co CCGG 125.450 -999.990 ... V4 2011 04 07 13 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 315411 MLO 2011 03 29 20 38 00 4038-99 P co CCGG 126.920 -999.990 ... V4 2011 04 07 13 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 315412 MLO 2011 04 12 20 13 00 4449-99 S co CCGG 89.420 -999.990 S.. V2 2011 04 18 15 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 316138 MLO 2011 04 12 20 40 00 1469-99 P co CCGG 95.500 -999.990 ... V2 2011 04 18 15 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 316139 MLO 2011 04 12 20 40 00 1517-99 P co CCGG 94.220 -999.990 ... V2 2011 04 18 15 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 316140 MLO 2011 04 19 20 04 00 4981-99 S co CCGG 76.790 -999.990 S.. V2 2011 04 28 14 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 316512 MLO 2011 04 19 20 04 00 4982-99 S co CCGG 76.360 -999.990 S.. V2 2011 04 28 14 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 316513 MLO 2011 04 19 20 39 00 4477-99 P co CCGG 78.780 -999.990 ... V2 2011 04 28 14 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 316510 MLO 2011 04 19 20 39 00 4478-99 P co CCGG 77.980 -999.990 ... V2 2011 04 28 14 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 316511 MLO 2011 04 26 20 14 00 1173-99 S co CCGG 116.030 -999.990 S.. V4 2011 05 03 14 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 317068 MLO 2011 04 26 20 14 00 1174-99 S co CCGG 116.210 -999.990 S.. V4 2011 05 03 14 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 317069 MLO 2011 04 26 20 49 00 1741-99 P co CCGG 113.060 -999.990 ... V4 2011 05 03 15 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 317070 MLO 2011 04 26 20 49 00 1742-99 P co CCGG 115.090 -999.990 ... V4 2011 05 03 15 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 317071 MLO 2011 05 03 20 16 00 337-99 S co CCGG 82.540 -999.990 S.. V2 2011 05 11 14 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 317472 MLO 2011 05 03 20 16 00 359-99 S co CCGG 82.070 -999.990 S.. V2 2011 05 11 14 32 00 19.5362 -155.5763 3437.00 3397.00 40.00 317473 MLO 2011 05 03 20 32 00 4835-99 P co CCGG 84.260 -999.990 ... V2 2011 05 11 15 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 317471 MLO 2011 05 03 20 32 00 831-99 P co CCGG 84.270 -999.990 ... V2 2011 05 11 14 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 317470 MLO 2011 05 10 20 15 00 3821-99 S co CCGG 70.320 -999.990 S.. V2 2011 05 18 16 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 317745 MLO 2011 05 10 20 15 00 5098-99 S co CCGG 69.730 -999.990 S.. V2 2011 05 18 17 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 317746 MLO 2011 05 10 20 40 00 2749-99 P co CCGG 70.920 -999.990 ... V2 2011 05 18 16 15 00 19.5362 -155.5763 3402.00 3397.00 5.00 317747 MLO 2011 05 10 20 40 00 474-99 P co CCGG 70.450 -999.990 ... V2 2011 05 18 16 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 317748 MLO 2011 05 17 20 03 00 2239-99 S co CCGG 94.580 -999.990 S.. V2 2011 05 24 16 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 318150 MLO 2011 05 17 20 03 00 2240-99 S co CCGG 94.500 -999.990 S.. V2 2011 05 24 16 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 318151 MLO 2011 05 17 20 32 00 4607-99 P co CCGG 98.660 -999.990 ... V2 2011 05 24 16 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 318148 MLO 2011 05 17 20 32 00 4608-99 P co CCGG 99.200 -999.990 ... V2 2011 05 24 16 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 318149 MLO 2011 05 24 20 50 00 315-99 P co CCGG 126.970 -999.990 .X. V2 2011 06 02 17 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 318490 MLO 2011 05 24 20 50 00 316-99 P co CCGG 128.580 -999.990 .X. V2 2011 06 02 17 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 318491 MLO 2011 05 24 20 58 00 1518-99 S co CCGG 109.290 -999.990 S.. V2 2011 06 02 16 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 318492 MLO 2011 05 24 20 58 00 4731-99 S co CCGG 110.000 -999.990 S.. V2 2011 06 02 16 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 318493 MLO 2011 05 31 20 19 00 1711-99 S co CCGG 78.250 -999.990 S.. V4 2011 06 08 13 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 318859 MLO 2011 05 31 20 19 00 2526-99 S co CCGG 78.120 -999.990 S.. V4 2011 06 08 13 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 318858 MLO 2011 05 31 20 54 00 1765-99 P co CCGG 80.410 -999.990 ... V4 2011 06 08 13 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 318860 MLO 2011 05 31 20 54 00 4105-99 P co CCGG 80.160 -999.990 ... V4 2011 06 08 13 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 318861 MLO 2011 06 07 20 01 00 2657-99 S co CCGG 80.180 -999.990 S.. V4 2011 06 14 12 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 319108 MLO 2011 06 07 20 01 00 4791-99 S co CCGG 80.180 -999.990 S.. V4 2011 06 14 12 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 319109 MLO 2011 06 07 20 47 00 2287-99 P co CCGG 82.770 -999.990 ... V4 2011 06 14 12 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 319107 MLO 2011 06 07 20 47 00 6301-66 P co CCGG 82.710 -999.990 ... V4 2011 06 14 11 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 319106 MLO 2011 06 14 20 01 00 639-99 S co CCGG 78.500 -999.990 S.. V2 2011 06 22 14 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 319536 MLO 2011 06 14 20 01 00 640-99 S co CCGG 79.440 -999.990 S.. V2 2011 06 22 14 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 319537 MLO 2011 06 14 20 36 00 2037-99 P co CCGG 81.610 -999.990 ... V2 2011 06 22 14 56 00 19.5362 -155.5763 3402.00 3397.00 5.00 319538 MLO 2011 06 14 20 36 00 2038-99 P co CCGG 79.990 -999.990 ... V2 2011 06 22 15 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 319539 MLO 2011 06 21 20 16 00 3323-99 S co CCGG 78.850 -999.990 S.. V2 2011 06 28 15 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 319796 MLO 2011 06 21 20 16 00 523-99 S co CCGG 79.240 -999.990 S.. V2 2011 06 28 15 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 319797 MLO 2011 06 21 20 43 00 2909-99 P co CCGG 82.370 -999.990 ... V2 2011 06 28 14 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 319794 MLO 2011 06 21 20 43 00 3567-99 P co CCGG 83.450 -999.990 ... V2 2011 06 28 14 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 319795 MLO 2011 06 28 20 05 00 5183-99 S co CCGG 82.240 -999.990 S.. V4 2011 07 11 16 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 320205 MLO 2011 06 28 20 05 00 5184-99 S co CCGG 82.410 -999.990 S.. V4 2011 07 11 16 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 320206 MLO 2011 06 28 20 29 00 3635-99 P co CCGG 84.450 -999.990 ... V4 2011 07 11 17 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 320204 MLO 2011 06 28 20 29 00 3636-99 P co CCGG 85.230 -999.990 ... V4 2011 07 11 17 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 320203 MLO 2011 07 05 20 03 00 1210-99 S co CCGG 68.260 -999.990 S.. V4 2011 07 18 15 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 320573 MLO 2011 07 05 20 03 00 2679-99 S co CCGG 68.500 -999.990 S.. V4 2011 07 18 15 58 00 19.5362 -155.5763 3437.00 3397.00 40.00 320574 MLO 2011 07 05 20 26 00 3140-99 P co CCGG 69.510 -999.990 ... V4 2011 07 19 10 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 320541 MLO 2011 07 12 19 47 00 233-99 P co CCGG 75.650 -999.990 ... V4 2011 07 22 15 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 320964 MLO 2011 07 12 19 47 00 234-99 P co CCGG 74.160 -999.990 ... V4 2011 07 22 15 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 320965 MLO 2011 07 12 20 10 00 2495-99 S co CCGG 73.030 -999.990 S.. V4 2011 07 22 15 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 320962 MLO 2011 07 12 20 10 00 2496-99 S co CCGG 72.430 -999.990 S.. V4 2011 07 22 15 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 320963 MLO 2011 07 19 20 09 00 5035-99 S co CCGG 70.520 -999.990 S.. V4 2011 08 01 12 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 321424 MLO 2011 07 19 20 09 00 5036-99 S co CCGG 70.500 -999.990 S.. V4 2011 08 01 12 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 321425 MLO 2011 07 19 20 38 00 1067-99 P co CCGG 71.860 -999.990 ... V4 2011 08 01 12 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 321426 MLO 2011 07 19 20 38 00 1068-99 P co CCGG 71.920 -999.990 ... V4 2011 08 01 13 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 321427 MLO 2011 07 26 20 03 00 1426-99 P co CCGG 64.650 -999.990 ... V2 2011 08 05 12 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 321712 MLO 2011 07 26 20 03 00 2749-99 P co CCGG 64.860 -999.990 ... V2 2011 08 05 12 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 321713 MLO 2011 07 26 20 06 00 2984-99 S co CCGG 64.240 -999.990 S.. V2 2011 08 05 12 09 00 19.5362 -155.5763 3437.00 3397.00 40.00 321710 MLO 2011 07 26 20 06 00 3743-99 S co CCGG 63.380 -999.990 S.. V2 2011 08 05 12 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 321711 MLO 2011 08 02 20 10 00 6761-66 P co CCGG 69.810 -999.990 ... V2 2011 08 16 11 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 322053 MLO 2011 08 02 20 10 00 6762-66 P co CCGG 71.440 -999.990 ... V2 2011 08 16 11 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 322052 MLO 2011 08 02 20 18 00 3283-99 S co CCGG 67.440 -999.990 S.. V2 2011 08 15 16 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 322050 MLO 2011 08 02 20 18 00 3284-99 S co CCGG 66.320 -999.990 S.. V2 2011 08 15 16 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 322051 MLO 2011 08 09 20 08 00 3962-99 P co CCGG 59.640 -999.990 ... V2 2011 08 19 11 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 322370 MLO 2011 08 09 20 08 00 4699-99 P co CCGG 59.980 -999.990 ... V2 2011 08 19 12 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 322371 MLO 2011 08 09 20 15 00 2583-99 S co CCGG 58.720 -999.990 S.. V2 2011 08 19 10 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 322368 MLO 2011 08 09 20 15 00 4746-99 S co CCGG 58.170 -999.990 S.. V2 2011 08 19 11 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 322369 MLO 2011 08 17 20 12 00 1081-99 S co CCGG 60.810 -999.990 S.. V2 2011 08 24 11 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 322593 MLO 2011 08 17 20 12 00 1093-99 S co CCGG 59.860 -999.990 S.. V2 2011 08 24 11 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 322594 MLO 2011 08 17 20 45 00 2554-99 P co CCGG 64.560 -999.990 ... V2 2011 08 24 10 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 322592 MLO 2011 08 17 20 45 00 290-99 P co CCGG 63.220 -999.990 ... V2 2011 08 24 10 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 322591 MLO 2011 08 23 20 15 00 109-99 S co CCGG 65.000 -999.990 S.. V2 2011 08 30 13 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 322967 MLO 2011 08 23 20 15 00 41-99 S co CCGG 64.220 -999.990 S.. V2 2011 08 30 13 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 322968 MLO 2011 08 23 20 33 00 3080-99 P co CCGG 66.170 -999.990 ... V2 2011 08 30 14 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 322969 MLO 2011 08 23 20 33 00 4357-99 P co CCGG 65.330 -999.990 ... V2 2011 08 30 13 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 322970 MLO 2011 08 30 20 13 00 1637-99 S co CCGG 75.230 -999.990 S.. V2 2011 09 09 14 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 323201 MLO 2011 08 30 20 13 00 1638-99 S co CCGG 74.920 -999.990 S.. V2 2011 09 09 14 32 00 19.5362 -155.5763 3437.00 3397.00 40.00 323202 MLO 2011 08 30 20 14 00 961-99 P co CCGG 77.590 -999.990 ... V2 2011 09 09 13 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 323203 MLO 2011 08 30 20 14 00 962-99 P co CCGG 79.710 -999.990 ... V2 2011 09 09 14 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 323204 MLO 2011 09 06 19 41 00 1047-99 P co CCGG 87.620 -999.990 ... V4 2011 09 15 12 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 323755 MLO 2011 09 06 19 41 00 4823-99 P co CCGG 86.740 -999.990 ... V4 2011 09 15 12 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 323756 MLO 2011 09 06 20 03 00 1002-99 S co CCGG 80.950 -999.990 S.. V4 2011 09 15 12 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 323753 MLO 2011 09 06 20 03 00 2992-99 S co CCGG 81.010 -999.990 S.. V4 2011 09 15 12 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 323754 MLO 2011 09 13 20 05 00 1497-99 P co CCGG 66.310 -999.990 ... V4 2011 09 22 11 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 324072 MLO 2011 09 13 20 05 00 3184-99 P co CCGG 66.390 -999.990 ... V4 2011 09 22 11 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 324071 MLO 2011 09 13 20 09 00 1027-99 S co CCGG 65.190 -999.990 S.. V4 2011 09 22 12 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 324070 MLO 2011 09 13 20 09 00 4862-99 S co CCGG 64.180 -999.990 S.. V4 2011 09 22 12 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 324069 MLO 2011 09 19 20 03 00 3065-99 P co CCGG 61.740 -999.990 ... V4 2011 09 28 12 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 324241 MLO 2011 09 19 20 03 00 3066-99 P co CCGG 61.320 -999.990 ... V4 2011 09 28 12 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 324242 MLO 2011 09 19 20 08 00 993-99 S co CCGG 60.530 -999.990 S.. V4 2011 09 28 13 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 324239 MLO 2011 09 19 20 08 00 994-99 S co CCGG 60.170 -999.990 S.. V4 2011 09 28 13 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 324240 MLO 2011 09 27 20 05 00 537-99 S co CCGG 85.720 -999.990 S.. V4 2011 10 06 11 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 324728 MLO 2011 09 27 20 05 00 538-99 S co CCGG 85.270 -999.990 S.. V4 2011 10 06 11 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 324729 MLO 2011 09 27 20 15 00 5111-99 P co CCGG 86.830 -999.990 ... V4 2011 10 06 11 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 324730 MLO 2011 09 27 20 15 00 5112-99 P co CCGG 86.060 -999.990 ... V4 2011 10 06 11 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 324731 MLO 2011 10 04 20 02 00 1729-99 P co CCGG 70.130 -999.990 ... V2 2011 10 13 11 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 325084 MLO 2011 10 04 20 02 00 1730-99 P co CCGG 68.460 -999.990 ... V2 2011 10 13 12 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 325083 MLO 2011 10 04 20 06 00 6139-66 S co CCGG 64.280 -999.990 S.. V2 2011 10 13 12 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 325085 MLO 2011 10 04 20 06 00 6140-66 S co CCGG 64.500 -999.990 S.. V2 2011 10 13 12 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 325086 MLO 2011 10 11 20 04 00 3119-99 P co CCGG 79.900 -999.990 S.. V2 2011 10 25 12 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 325418 MLO 2011 10 11 20 04 00 3120-99 P co CCGG 81.160 -999.990 S.. V2 2011 10 25 12 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 325419 MLO 2011 10 11 20 06 00 3721-99 S co CCGG 78.310 -999.990 S.. V2 2011 10 25 12 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 325416 MLO 2011 10 11 20 06 00 3722-99 S co CCGG 78.170 -999.990 S.. V2 2011 10 25 12 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 325417 MLO 2011 10 18 19 59 00 1452-99 P co CCGG 89.060 -999.990 ... V4 2011 11 03 10 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 325893 MLO 2011 10 18 19 59 00 3805-99 P co CCGG 88.710 -999.990 ... V4 2011 11 03 10 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 325892 MLO 2011 10 18 20 04 00 237-99 S co CCGG 89.080 -999.990 S.. V4 2011 11 03 10 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 325891 MLO 2011 10 18 20 04 00 5203-99 S co CCGG 88.840 -999.990 S.. V4 2011 11 03 09 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 325890 MLO 2011 10 25 20 04 00 240-99 P co CCGG 72.620 -999.990 ... V4 2011 11 08 14 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 326195 MLO 2011 10 25 20 04 00 6264-66 P co CCGG 71.190 -999.990 ... V4 2011 11 08 14 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 326194 MLO 2011 10 25 20 16 00 2888-99 S co CCGG 69.540 -999.990 S.. V4 2011 11 08 14 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 326193 MLO 2011 10 25 20 16 00 6446-66 S co CCGG 70.010 -999.990 S.. V4 2011 11 08 13 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 326192 MLO 2011 11 01 20 01 00 3514-99 P co CCGG 82.830 -999.990 ... V4 2011 11 15 14 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 326683 MLO 2011 11 01 20 01 00 4528-99 P co CCGG 82.560 -999.990 ... V4 2011 11 15 14 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 326684 MLO 2011 11 01 20 08 00 3298-99 S co CCGG 81.530 -999.990 S.. V4 2011 11 15 14 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 326682 MLO 2011 11 01 20 08 00 3816-99 S co CCGG 82.850 -999.990 S.. V4 2011 11 15 14 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 326681 MLO 2011 11 08 20 08 00 2431-99 P co CCGG 72.760 -999.990 ... V4 2011 11 22 15 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 326896 MLO 2011 11 08 20 08 00 6330-66 P co CCGG 71.750 -999.990 ... V4 2011 11 22 15 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 326895 MLO 2011 11 08 20 13 00 109-99 S co CCGG 69.880 -999.990 S.. V4 2011 11 21 15 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 326898 MLO 2011 11 08 20 13 00 802-99 S co CCGG 68.770 -999.990 S.. V4 2011 11 21 15 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 326897 MLO 2011 11 15 20 15 00 3419-99 S co CCGG 82.530 -999.990 S.. V4 2011 12 02 10 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 327191 MLO 2011 11 15 20 15 00 3420-99 S co CCGG 83.490 -999.990 S.. V4 2011 12 02 11 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 327192 MLO 2011 11 15 20 29 00 1639-99 P co CCGG 82.710 -999.990 ... V4 2011 12 02 11 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 327193 MLO 2011 11 15 20 29 00 1640-99 P co CCGG 83.280 -999.990 ... V4 2011 12 02 11 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 327194 MLO 2011 11 22 20 05 00 2159-99 S co CCGG 71.290 -999.990 S.. V4 2011 12 05 13 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 327377 MLO 2011 11 22 20 05 00 2160-99 S co CCGG 71.260 -999.990 S.. V4 2011 12 05 13 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 327378 MLO 2011 11 22 20 12 00 1677-99 P co CCGG 73.540 -999.990 ... V4 2011 12 05 12 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 327379 MLO 2011 11 22 20 12 00 1678-99 P co CCGG 73.300 -999.990 ... V4 2011 12 05 12 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 327380 MLO 2011 11 29 20 04 00 3706-99 P co CCGG 88.550 -999.990 ... V4 2011 12 21 14 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 327766 MLO 2011 11 29 20 06 00 1568-99 S co CCGG 88.080 -999.990 S.. V4 2011 12 13 15 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 327764 MLO 2011 11 29 20 06 00 691-99 S co CCGG 88.210 -999.990 S.. V4 2011 12 13 15 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 327765 MLO 2011 12 06 20 06 00 2689-99 P co CCGG 87.190 -999.990 ... V2 2011 12 21 10 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 328106 MLO 2011 12 06 20 06 00 2690-99 P co CCGG 87.200 -999.990 ... V2 2011 12 21 11 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 328107 MLO 2011 12 06 20 09 00 3017-99 S co CCGG 85.480 -999.990 S.. V2 2011 12 21 11 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 328104 MLO 2011 12 06 20 09 00 3018-99 S co CCGG 85.190 -999.990 S.. V2 2011 12 21 11 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 328105 MLO 2011 12 13 19 55 00 4164-99 P co CCGG 89.140 -999.990 ... V2 2012 01 04 09 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 328540 MLO 2011 12 13 19 55 00 4817-99 P co CCGG 88.740 -999.990 ... V2 2012 01 04 09 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 328541 MLO 2011 12 13 20 06 00 319-99 S co CCGG 89.380 -999.990 S.. V2 2012 01 03 16 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 328538 MLO 2011 12 13 20 06 00 6578-66 S co CCGG 89.060 -999.990 S.. V2 2012 01 03 16 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 328539 MLO 2011 12 20 20 08 00 3727-99 P co CCGG 89.180 -999.990 ... V4 2012 01 06 12 12 00 19.5362 -155.5763 3402.00 3397.00 5.00 328800 MLO 2011 12 20 20 08 00 3728-99 P co CCGG 89.670 -999.990 ... V4 2012 01 06 12 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 328801 MLO 2011 12 20 20 13 00 1999-99 S co CCGG 89.690 -999.990 S.. V4 2012 01 06 11 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 328798 MLO 2011 12 20 20 13 00 2000-99 S co CCGG 90.480 -999.990 S.. V4 2012 01 06 11 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 328799 MLO 2011 12 27 20 06 00 4985-99 P co CCGG 90.430 -999.990 ... V2 2012 01 09 13 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 328852 MLO 2011 12 27 20 06 00 4986-99 P co CCGG 91.290 -999.990 ... V2 2012 01 09 13 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 328853 MLO 2011 12 27 20 11 00 1455-99 S co CCGG 89.210 -999.990 S.. V2 2012 01 09 14 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 328850 MLO 2011 12 27 20 11 00 1456-99 S co CCGG 87.820 -999.990 S.. V2 2012 01 09 14 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 328851 MLO 2012 01 03 20 07 00 2419-99 P co CCGG 93.160 -999.990 ... V4 2012 01 13 15 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 329246 MLO 2012 01 03 20 07 00 2420-99 P co CCGG 92.430 -999.990 ... V4 2012 01 13 16 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 329247 MLO 2012 01 03 20 13 00 4763-99 S co CCGG 89.450 -999.990 S.. V4 2012 01 16 11 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 329244 MLO 2012 01 03 20 13 00 4764-99 S co CCGG 89.660 -999.990 S.. V4 2012 01 16 11 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 329245 MLO 2012 01 10 20 10 00 2964-99 P co CCGG 114.340 -999.990 ... V4 2012 01 23 12 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 329638 MLO 2012 01 10 20 10 00 3681-99 P co CCGG 113.700 -999.990 ... V4 2012 01 23 13 15 00 19.5362 -155.5763 3402.00 3397.00 5.00 329639 MLO 2012 01 10 20 14 00 2581-99 S co CCGG 113.630 -999.990 S.. V4 2012 01 23 12 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 329641 MLO 2012 01 10 20 14 00 4497-99 S co CCGG 113.910 -999.990 S.. V4 2012 01 23 12 29 00 19.5362 -155.5763 3437.00 3397.00 40.00 329640 MLO 2012 01 17 20 07 00 1392-99 P co CCGG 87.310 -999.990 ... V2 2012 01 27 15 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 330211 MLO 2012 01 17 20 07 00 6051-66 P co CCGG 86.430 -999.990 ... V2 2012 01 27 16 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 330212 MLO 2012 01 17 20 11 00 2293-99 S co CCGG 87.370 -999.990 S.. V2 2012 01 27 15 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 330210 MLO 2012 01 17 20 11 00 672-99 S co CCGG 86.180 -999.990 S.. V2 2012 01 27 15 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 330209 MLO 2012 01 24 20 04 00 2746-99 P co CCGG 105.470 -999.990 ... V2 2012 02 02 14 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 330441 MLO 2012 01 24 20 04 00 4783-99 P co CCGG 104.340 -999.990 ... V2 2012 02 02 14 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 330440 MLO 2012 01 24 20 09 00 1561-99 S co CCGG 100.010 -999.990 S.. V2 2012 02 02 13 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 330443 MLO 2012 01 24 20 09 00 3338-99 S co CCGG 100.060 -999.990 S.. V2 2012 02 02 13 32 00 19.5362 -155.5763 3437.00 3397.00 40.00 330442 MLO 2012 01 31 20 06 00 2782-99 P co CCGG 80.690 -999.990 ... V4 2012 02 08 15 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 330990 MLO 2012 01 31 20 06 00 4223-99 P co CCGG 77.590 -999.990 ... V4 2012 02 08 15 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 330989 MLO 2012 01 31 20 11 00 3370-99 S co CCGG 81.950 -999.990 S.. V2 2012 02 09 10 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 330991 MLO 2012 01 31 20 11 00 5049-99 S co CCGG 80.930 -999.990 S.. V2 2012 02 09 10 59 00 19.5362 -155.5763 3437.00 3397.00 40.00 330992 MLO 2012 02 07 20 09 00 4719-99 S co CCGG 80.980 -999.990 S.. V4 2012 02 15 10 09 00 19.5362 -155.5763 3437.00 3397.00 40.00 331305 MLO 2012 02 07 20 09 00 4720-99 S co CCGG 81.030 -999.990 S.. V4 2012 02 15 10 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 331306 MLO 2012 02 07 20 40 00 971-99 P co CCGG 81.650 -999.990 ... V4 2012 02 15 10 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 331307 MLO 2012 02 07 20 40 00 972-99 P co CCGG 81.210 -999.990 ... V4 2012 02 15 10 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 331308 MLO 2012 02 14 20 00 00 1297-99 S co CCGG 102.130 -999.990 S.. V4 2012 02 22 13 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 331794 MLO 2012 02 14 20 00 00 1869-99 S co CCGG 102.530 -999.990 S.. V4 2012 02 22 14 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 331795 MLO 2012 02 14 20 31 00 541-99 P co CCGG 105.030 -999.990 ... V4 2012 02 22 14 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 331796 MLO 2012 02 14 20 31 00 96-99 P co CCGG 104.990 -999.990 ... V4 2012 02 22 14 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 331797 MLO 2012 02 23 20 06 00 1333-99 P co CCGG 103.900 -999.990 ... V4 2012 03 08 11 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 332127 MLO 2012 02 23 20 06 00 1334-99 P co CCGG 110.830 -999.990 ... V4 2012 03 08 11 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 332128 MLO 2012 02 23 20 15 00 5363-99 S co CCGG 111.200 -999.990 S.. V4 2012 03 08 10 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 332125 MLO 2012 02 23 20 15 00 5364-99 S co CCGG 111.570 -999.990 S.. V4 2012 03 08 11 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 332126 MLO 2012 02 28 20 08 00 1529-99 P co CCGG 75.030 -999.990 ... V4 2012 03 12 15 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 332417 MLO 2012 02 28 20 08 00 1530-99 P co CCGG 74.140 -999.990 ... V4 2012 03 12 15 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 332418 MLO 2012 02 28 20 12 00 993-99 S co CCGG 93.630 -999.990 S.. V4 2012 03 12 14 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 332415 MLO 2012 02 28 20 12 00 994-99 S co CCGG 93.780 -999.990 S.. V4 2012 03 12 14 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 332416 MLO 2012 03 06 20 03 00 2663-99 P co CCGG 63.750 -999.990 -.. V4 2012 03 16 14 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 332719 MLO 2012 03 06 20 03 00 3345-99 P co CCGG 69.570 -999.990 +.. V4 2012 03 16 14 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 332718 MLO 2012 03 06 20 06 00 6394-66 S co CCGG 78.200 -999.990 S.. V4 2012 03 16 14 50 00 19.5362 -155.5763 3437.00 3397.00 40.00 332717 MLO 2012 03 06 20 06 00 84-99 S co CCGG 79.210 -999.990 S.. V4 2012 03 16 14 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 332716 MLO 2012 03 13 20 09 00 6051-66 P co CCGG 85.950 -999.990 ... V4 2012 03 30 15 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 333128 MLO 2012 03 13 20 14 00 6098-66 S co CCGG 85.410 -999.990 S.. V4 2012 03 26 14 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 333127 MLO 2012 03 13 20 14 00 6566-66 S co CCGG 85.380 -999.990 S.. V4 2012 03 26 13 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 333126 MLO 2012 03 20 20 03 00 2778-99 P co CCGG 105.880 -999.990 ... V4 2012 04 04 10 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 333317 MLO 2012 03 20 20 03 00 3095-99 P co CCGG 105.560 -999.990 ... V4 2012 04 04 10 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 333316 MLO 2012 03 20 20 10 00 1612-99 S co CCGG 109.430 -999.990 S.. V4 2012 04 04 11 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 333315 MLO 2012 03 20 20 10 00 704-99 S co CCGG 110.100 -999.990 S.. V4 2012 04 04 11 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 333314 MLO 2012 03 27 20 09 00 3853-99 P co CCGG 112.220 -999.990 +.. V4 2012 04 11 11 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 333795 MLO 2012 03 27 20 09 00 6780-66 P co CCGG 105.790 -999.990 -.. V4 2012 04 11 11 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 333796 MLO 2012 03 27 20 13 00 228-99 S co CCGG 126.060 -999.990 S.. V4 2012 04 11 10 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 333794 MLO 2012 03 27 20 13 00 3823-99 S co CCGG 125.510 -999.990 S.. V4 2012 04 11 10 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 333793 MLO 2012 04 03 20 10 00 5139-99 S co CCGG 102.500 -999.990 S.. V4 2012 04 16 15 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 334017 MLO 2012 04 03 20 10 00 5140-99 S co CCGG 102.920 -999.990 S.. V4 2012 04 16 16 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 334018 MLO 2012 04 03 20 55 00 1057-99 P co CCGG 90.850 -999.990 +.. V4 2012 04 17 09 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 334019 MLO 2012 04 03 20 55 00 1058-99 P co CCGG 80.920 -999.990 -.. V4 2012 04 17 09 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 334020 MLO 2012 04 10 20 05 00 4171-99 P co CCGG 117.480 -999.990 -.. V4 2012 04 24 16 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 334295 MLO 2012 04 10 20 05 00 83-99 P co CCGG 121.470 -999.990 +.. V4 2012 04 24 16 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 334296 MLO 2012 04 10 20 09 00 5084-99 S co CCGG 137.040 -999.990 S.. V4 2012 04 24 13 59 00 19.5362 -155.5763 3437.00 3397.00 40.00 334293 MLO 2012 04 10 20 09 00 6334-66 S co CCGG 134.360 -999.990 S.. V4 2012 04 24 14 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 334294 MLO 2012 04 17 20 03 00 4863-99 P co CCGG 114.960 -999.990 +.. V4 2012 05 10 11 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 334615 MLO 2012 04 17 20 03 00 4864-99 P co CCGG 109.400 -999.990 -.. V4 2012 05 10 11 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 334616 MLO 2012 04 17 20 09 00 2639-99 S co CCGG 133.460 -999.990 S.. V2 2012 05 10 11 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 334613 MLO 2012 04 17 20 09 00 2640-99 S co CCGG 139.430 -999.990 S.. V2 2012 05 10 12 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 334614 MLO 2012 04 17 20 09 00 2640-99 S co CCGG 134.700 -999.990 S.. V2 2012 05 10 12 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 334614 MLO 2012 04 24 20 08 00 4142-99 P co CCGG 113.440 -999.990 ... V2 2012 05 08 15 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 334902 MLO 2012 04 24 20 08 00 6826-66 P co CCGG 114.190 -999.990 ... V2 2012 05 08 15 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 334903 MLO 2012 04 24 20 14 00 172-99 S co CCGG 112.230 -999.990 S.. V4 2012 05 08 14 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 334900 MLO 2012 04 24 20 14 00 3207-99 S co CCGG 111.970 -999.990 S.. V4 2012 05 08 14 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 334901 MLO 2012 05 01 20 05 00 1198-99 S co CCGG 106.680 -999.990 S.. V4 2012 05 17 12 59 00 19.5362 -155.5763 3437.00 3397.00 40.00 335264 MLO 2012 05 01 20 05 00 2394-99 S co CCGG 107.560 -999.990 S.. V4 2012 05 17 12 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 335263 MLO 2012 05 01 20 29 00 1766-99 P co CCGG 106.900 -999.990 ... V4 2012 05 17 13 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 335265 MLO 2012 05 01 20 29 00 4674-99 P co CCGG 107.540 -999.990 ... V4 2012 05 17 13 15 00 19.5362 -155.5763 3402.00 3397.00 5.00 335266 MLO 2012 05 08 20 04 00 2876-99 P co CCGG 95.560 -999.990 ... V4 2012 05 22 14 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 335558 MLO 2012 05 08 20 04 00 75-99 P co CCGG 93.270 -999.990 ... V4 2012 05 22 14 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 335557 MLO 2012 05 08 20 06 00 3715-99 S co CCGG 91.270 -999.990 S.. V4 2012 05 22 14 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 335556 MLO 2012 05 08 20 06 00 4334-99 S co CCGG 100.710 -999.990 S.. V4 2012 05 22 14 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 335555 MLO 2012 05 14 20 15 00 2609-99 P co CCGG 112.180 -999.990 ... V2 2012 05 23 15 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 335770 MLO 2012 05 14 20 15 00 2610-99 P co CCGG 113.500 -999.990 ... V2 2012 05 23 15 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 335771 MLO 2012 05 14 20 18 00 4329-99 S co CCGG 113.010 -999.990 S.. V2 2012 05 23 14 59 00 19.5362 -155.5763 3437.00 3397.00 40.00 335768 MLO 2012 05 14 20 18 00 4330-99 S co CCGG 117.490 -999.990 S.. V2 2012 05 23 15 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 335769 MLO 2012 05 22 20 14 00 3291-99 S co CCGG 84.850 -999.990 S.. V2 2012 05 31 14 50 00 19.5362 -155.5763 3437.00 3397.00 40.00 336135 MLO 2012 05 22 20 14 00 3292-99 S co CCGG 83.770 -999.990 S.. V2 2012 05 31 15 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 336136 MLO 2012 05 22 20 30 00 2523-99 P co CCGG 78.040 -999.990 ... V2 2012 05 31 14 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 336137 MLO 2012 05 22 20 30 00 2524-99 P co CCGG 79.470 -999.990 ... V2 2012 05 31 14 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 336138 MLO 2012 05 29 20 03 00 3997-99 P co CCGG 89.340 -999.990 -.. V4 2012 06 07 14 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 336677 MLO 2012 05 29 20 03 00 3998-99 P co CCGG 92.340 -999.990 +.. V4 2012 06 07 14 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 336678 MLO 2012 05 29 20 07 00 1395-99 S co CCGG 108.090 -999.990 S.. V4 2012 06 07 14 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 336675 MLO 2012 05 29 20 07 00 1396-99 S co CCGG 109.730 -999.990 S.. V4 2012 06 07 14 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 336676 MLO 2012 06 05 20 03 00 3109-99 P co CCGG 64.550 -999.990 ... V4 2012 06 19 11 37 00 19.5362 -155.5763 3402.00 3397.00 5.00 337015 MLO 2012 06 05 20 03 00 3110-99 P co CCGG 63.730 -999.990 ... V4 2012 06 19 11 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 337016 MLO 2012 06 05 20 07 00 1071-99 S co CCGG 75.460 -999.990 S.. V4 2012 06 19 12 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 337013 MLO 2012 06 05 20 07 00 1072-99 S co CCGG 74.810 -999.990 S.. V4 2012 06 19 12 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 337014 MLO 2012 06 12 20 03 00 2737-99 P co CCGG 33.360 -999.990 N.. V4 2012 06 25 14 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 337281 MLO 2012 06 12 20 03 00 2738-99 P co CCGG 35.140 -999.990 N.. V4 2012 06 25 14 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 337282 MLO 2012 06 12 20 06 00 2179-99 S co CCGG 75.060 -999.990 S.. V4 2012 06 25 14 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 337279 MLO 2012 06 12 20 06 00 2180-99 S co CCGG 76.690 -999.990 S.. V4 2012 06 25 15 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 337280 MLO 2012 06 19 19 59 00 3249-99 P co CCGG 26.920 -999.990 N.. V4 2012 06 29 11 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 337665 MLO 2012 06 19 19 59 00 3250-99 P co CCGG 9.910 -999.990 N.. V4 2012 06 29 11 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 337666 MLO 2012 06 19 20 07 00 3687-99 S co CCGG 80.670 -999.990 S.. V4 2012 06 29 12 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 337663 MLO 2012 06 19 20 07 00 3688-99 S co CCGG 78.470 -999.990 S.. V4 2012 06 29 12 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 337664 MLO 2012 06 26 20 02 00 4811-99 P co CCGG 70.490 -999.990 ... V4 2012 07 11 12 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 337906 MLO 2012 06 26 20 02 00 4812-99 P co CCGG 71.630 -999.990 ... V4 2012 07 11 12 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 337911 MLO 2012 06 26 20 06 00 4879-99 S co CCGG 70.140 -999.990 S.. V4 2012 07 11 13 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 337904 MLO 2012 06 26 20 06 00 4880-99 S co CCGG 70.460 -999.990 S.. V4 2012 07 11 13 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 337905 MLO 2012 07 03 20 05 00 4969-99 P co CCGG 78.640 -999.990 ... V4 2012 07 24 16 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 338378 MLO 2012 07 03 20 05 00 4970-99 P co CCGG 77.670 -999.990 ... V4 2012 07 24 16 18 00 19.5362 -155.5763 3402.00 3397.00 5.00 338379 MLO 2012 07 03 20 10 00 1749-99 S co CCGG 78.060 -999.990 S.. V4 2012 07 24 15 32 00 19.5362 -155.5763 3437.00 3397.00 40.00 338380 MLO 2012 07 03 20 10 00 1750-99 S co CCGG 78.110 -999.990 S.. V4 2012 07 24 15 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 338381 MLO 2012 07 10 19 06 00 4919-99 P co CCGG 67.380 -999.990 ... V4 2012 07 26 14 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 338558 MLO 2012 07 10 19 06 00 4920-99 P co CCGG 68.330 -999.990 ... V4 2012 07 26 14 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 338559 MLO 2012 07 10 19 10 00 2619-99 S co CCGG 67.440 -999.990 S.. V4 2012 07 26 13 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 338560 MLO 2012 07 10 19 10 00 2620-99 S co CCGG 67.480 -999.990 S.. V4 2012 07 26 13 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 338561 MLO 2012 07 17 19 03 00 3601-99 P co CCGG 68.360 -999.990 ... V4 2012 08 07 14 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 338875 MLO 2012 07 17 19 03 00 3602-99 P co CCGG 69.140 -999.990 ... V4 2012 08 07 15 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 338876 MLO 2012 07 17 19 10 00 1651-99 S co CCGG 68.170 -999.990 S.. V4 2012 08 07 15 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 338877 MLO 2012 07 17 19 10 00 1652-99 S co CCGG 68.720 -999.990 S.. V4 2012 08 07 15 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 338878 MLO 2012 07 24 20 03 00 1721-99 P co CCGG 62.540 -999.990 ... V4 2012 08 09 12 28 00 19.5362 -155.5763 3402.00 3397.00 5.00 339194 MLO 2012 07 24 20 03 00 1722-99 P co CCGG 61.190 -999.990 ... V4 2012 08 09 12 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 339195 MLO 2012 07 24 20 07 00 3721-99 S co CCGG 71.650 -999.990 S.. V4 2012 08 09 11 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 339196 MLO 2012 07 24 20 07 00 3722-99 S co CCGG 71.990 -999.990 S.. V4 2012 08 09 12 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 339197 MLO 2012 07 31 19 06 00 2534-99 P co CCGG 56.560 -999.990 ... V4 2012 08 20 14 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 339510 MLO 2012 07 31 19 06 00 3852-99 P co CCGG 58.500 -999.990 ... V4 2012 08 20 13 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 339511 MLO 2012 07 31 19 08 00 3212-99 S co CCGG 65.240 -999.990 S.. V4 2012 08 20 13 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 339508 MLO 2012 07 31 19 08 00 5206-99 S co CCGG 65.020 -999.990 S.. V4 2012 08 20 13 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 339509 MLO 2012 08 07 20 01 00 3961-99 P co CCGG 49.260 -999.990 ... V4 2012 08 23 14 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 339808 MLO 2012 08 07 20 01 00 5310-99 P co CCGG 51.930 -999.990 ... V4 2012 08 23 14 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 339809 MLO 2012 08 07 20 07 00 415-99 S co CCGG 62.100 -999.990 S.. V4 2012 08 23 13 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 339811 MLO 2012 08 07 20 07 00 5113-99 S co CCGG 61.880 -999.990 S.. V4 2012 08 23 13 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 339810 MLO 2012 08 14 19 55 00 1700-99 S co CCGG 74.260 -999.990 S.. V4 2012 08 29 12 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 340002 MLO 2012 08 14 19 55 00 4630-99 S co CCGG 73.500 -999.990 S.. V4 2012 08 29 11 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 340001 MLO 2012 08 14 20 36 00 1411-99 P co CCGG 40.410 -999.990 -.. V4 2012 08 28 14 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 340000 MLO 2012 08 14 20 36 00 4105-99 P co CCGG 58.730 -999.990 +.. V4 2012 08 28 14 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 339999 MLO 2012 08 21 20 05 00 1613-99 P co CCGG 84.830 -999.990 ... V4 2012 09 06 11 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 340444 MLO 2012 08 21 20 05 00 3008-99 P co CCGG 83.360 -999.990 ... V4 2012 09 06 12 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 340445 MLO 2012 08 21 20 10 00 3667-99 S co CCGG 83.140 -999.990 S.. V4 2012 09 06 12 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 340446 MLO 2012 08 30 20 00 00 3315-99 P co CCGG 67.130 -999.990 ... V4 2012 09 18 11 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 340985 MLO 2012 08 30 20 00 00 3316-99 P co CCGG 66.940 -999.990 ... V4 2012 09 18 11 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 340986 MLO 2012 08 30 20 03 00 465-99 S co CCGG 67.200 -999.990 S.. V4 2012 09 18 11 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 340987 MLO 2012 08 30 20 03 00 466-99 S co CCGG 67.030 -999.990 S.. V4 2012 09 18 11 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 340988 MLO 2012 09 04 20 07 00 6479-66 P co CCGG 73.940 -999.990 ... V4 2012 09 18 16 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 340999 MLO 2012 09 04 20 07 00 6480-66 P co CCGG 74.390 -999.990 ... V4 2012 09 18 16 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 341000 MLO 2012 09 04 20 13 00 3723-99 S co CCGG 73.390 -999.990 S.. V4 2012 09 18 15 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 340997 MLO 2012 09 04 20 13 00 3724-99 S co CCGG 73.880 -999.990 S.. V4 2012 09 18 15 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 340998 MLO 2012 09 11 20 17 00 2836-99 S co CCGG 71.660 -999.990 S.. V4 2012 09 25 11 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 341367 MLO 2012 09 11 20 17 00 6195-66 S co CCGG 89.030 -999.990 S.. V4 2012 09 25 11 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 341366 MLO 2012 09 11 20 53 00 3519-99 P co CCGG 75.630 -999.990 ... V4 2012 09 26 14 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 341368 MLO 2012 09 11 20 53 00 911-99 P co CCGG 76.440 -999.990 ... V4 2012 09 26 14 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 341369 MLO 2012 09 18 20 11 00 277-99 P co CCGG 79.130 -999.990 ... V4 2012 09 28 11 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 341737 MLO 2012 09 18 20 11 00 6054-66 P co CCGG 78.870 -999.990 ... V4 2012 09 28 11 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 341736 MLO 2012 09 18 20 13 00 1249-99 S co CCGG 77.440 -999.990 S.. V4 2012 09 28 11 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 341735 MLO 2012 09 18 20 13 00 3731-99 S co CCGG 77.640 -999.990 S.. V4 2012 09 28 10 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 341734 MLO 2012 09 25 20 00 00 163-99 P co CCGG 72.820 -999.990 +.. V4 2012 10 15 10 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 342229 MLO 2012 09 25 20 00 00 164-99 P co CCGG 68.870 -999.990 -.. V4 2012 10 15 11 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 342230 MLO 2012 09 25 20 06 00 4281-99 S co CCGG 72.280 -999.990 S.. V4 2012 10 15 11 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 342231 MLO 2012 09 25 20 06 00 4282-99 S co CCGG 71.650 -999.990 S.. V4 2012 10 15 12 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 342232 MLO 2012 10 02 19 59 00 4969-99 P co CCGG 72.580 -999.990 ... V4 2012 10 18 12 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 342492 MLO 2012 10 02 19 59 00 4970-99 P co CCGG 73.860 -999.990 ... V4 2012 10 18 12 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 342493 MLO 2012 10 02 20 07 00 329-99 S co CCGG 82.110 -999.990 S.. V4 2012 10 18 12 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 342494 MLO 2012 10 02 20 07 00 330-99 S co CCGG 82.770 -999.990 S.. V4 2012 10 18 12 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 342495 MLO 2012 10 09 20 00 00 2822-99 P co CCGG 70.960 -999.990 ... V4 2012 10 25 13 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 342730 MLO 2012 10 09 20 00 00 3386-99 P co CCGG 70.390 -999.990 ... V4 2012 10 25 13 56 00 19.5362 -155.5763 3402.00 3397.00 5.00 342731 MLO 2012 10 09 20 17 00 1698-99 S co CCGG 72.300 -999.990 S.. V4 2012 10 25 13 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 342732 MLO 2012 10 09 20 17 00 2606-99 S co CCGG 71.980 -999.990 S.. V4 2012 10 25 13 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 342733 MLO 2012 10 16 19 32 00 114-99 P co CCGG 80.450 -999.990 ... V4 2012 11 05 10 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 343126 MLO 2012 10 16 19 32 00 3609-99 P co CCGG 81.810 -999.990 ... V4 2012 11 05 10 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 343125 MLO 2012 10 16 20 06 00 1511-99 S co CCGG 79.040 -999.990 S.. V4 2012 11 05 11 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 343127 MLO 2012 10 16 20 06 00 2560-99 S co CCGG 79.110 -999.990 S.. V4 2012 11 05 11 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 343128 MLO 2012 10 23 19 24 00 347-99 P co CCGG 78.180 -999.990 ... V4 2012 11 09 11 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 343410 MLO 2012 10 23 19 24 00 5285-99 P co CCGG 77.290 -999.990 ... V4 2012 11 09 11 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 343411 MLO 2012 10 23 20 00 00 4572-99 S co CCGG 76.540 -999.990 S.. V4 2012 11 09 10 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 343412 MLO 2012 10 23 20 00 00 4993-99 S co CCGG 76.480 -999.990 S.. V4 2012 11 09 10 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 343413 MLO 2012 10 30 19 19 00 3597-99 S co CCGG 85.180 -999.990 S.. V4 2012 11 14 16 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 343535 MLO 2012 10 30 19 19 00 5198-99 S co CCGG 85.450 -999.990 S.. V4 2012 11 14 16 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 343534 MLO 2012 10 30 19 42 00 4428-99 P co CCGG 86.310 -999.990 ... V4 2012 11 14 14 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 343536 MLO 2012 10 30 19 42 00 6113-66 P co CCGG 88.440 -999.990 ... V4 2012 11 14 15 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 343537 MLO 2012 11 06 19 32 00 3641-99 P co CCGG 74.590 -999.990 ... V4 2012 11 19 12 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 343907 MLO 2012 11 06 19 32 00 3642-99 P co CCGG 74.820 -999.990 ... V4 2012 11 19 13 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 343908 MLO 2012 11 06 20 02 00 3491-99 S co CCGG 73.780 -999.990 S.. V4 2012 11 19 12 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 343905 MLO 2012 11 06 20 02 00 3492-99 S co CCGG 74.350 -999.990 S.. V4 2012 11 19 12 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 343906 MLO 2012 11 13 20 06 00 3187-99 S co CCGG 89.660 -999.990 S.. V4 2012 11 27 11 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 344034 MLO 2012 11 13 20 06 00 3188-99 S co CCGG 89.290 -999.990 S.. V4 2012 11 27 12 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 344035 MLO 2012 11 13 20 11 00 6217-66 P co CCGG 88.280 -999.990 ... V4 2012 11 27 11 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 344036 MLO 2012 11 13 20 11 00 6218-66 P co CCGG 87.830 -999.990 ... V4 2012 11 27 11 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 344037 MLO 2012 11 20 09 42 00 3056-99 P co CCGG 93.610 -999.990 ... V4 2012 12 05 13 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 344420 MLO 2012 11 20 09 42 00 3297-99 P co CCGG 93.280 -999.990 ... V4 2012 12 05 13 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 344421 MLO 2012 11 20 20 09 00 2343-99 S co CCGG 87.690 -999.990 S.. V4 2012 12 05 15 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 344419 MLO 2012 11 20 20 09 00 6129-66 S co CCGG 87.730 -999.990 S.. V4 2012 12 05 15 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 344418 MLO 2012 11 27 19 37 00 2867-99 P co CCGG 109.840 -999.990 ... V4 2012 12 18 08 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 344782 MLO 2012 11 27 19 37 00 2868-99 P co CCGG 107.550 -999.990 ... V4 2012 12 18 09 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 344783 MLO 2012 11 27 20 05 00 2045-99 S co CCGG 118.900 -999.990 S.. V4 2012 12 18 10 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 344780 MLO 2012 11 27 20 05 00 2046-99 S co CCGG 118.270 -999.990 S.. V4 2012 12 18 10 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 344781 MLO 2012 12 04 20 02 00 3734-99 P co CCGG 56.460 -999.990 -.. V4 2012 12 20 12 37 00 19.5362 -155.5763 3402.00 3397.00 5.00 345073 MLO 2012 12 04 20 02 00 6114-66 P co CCGG 62.620 -999.990 +.. V4 2012 12 20 12 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 345072 MLO 2012 12 04 20 11 00 3269-99 S co CCGG 68.810 -999.990 S.. V4 2012 12 20 13 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 345071 MLO 2012 12 04 20 11 00 3318-99 S co CCGG 68.520 -999.990 S.. V4 2012 12 20 13 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 345070 MLO 2012 12 11 20 07 00 1138-99 P co CCGG 91.020 -999.990 ... V2 2012 12 21 10 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 345294 MLO 2012 12 11 20 07 00 5071-99 P co CCGG 91.960 -999.990 ... V2 2012 12 21 10 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 345295 MLO 2012 12 11 20 11 00 1586-99 S co CCGG 92.760 -999.990 S.. V2 2012 12 21 11 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 345293 MLO 2012 12 11 20 11 00 5105-99 S co CCGG 91.800 -999.990 S.. V2 2012 12 21 11 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 345292 MLO 2012 12 18 20 11 00 3829-99 S co CCGG 98.580 -999.990 S.. V4 2013 01 10 10 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 345628 MLO 2012 12 18 20 11 00 3830-99 S co CCGG 92.960 -999.990 S.. V4 2013 01 10 11 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 345629 MLO 2012 12 18 20 48 00 3703-99 P co CCGG 66.950 -999.990 +.. V4 2013 01 10 11 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 345614 MLO 2012 12 18 20 48 00 3704-99 P co CCGG 56.270 -999.990 -.. V4 2013 01 10 11 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 345615 MLO 2012 12 27 19 39 00 2023-99 P co CCGG 87.790 -999.990 ... V4 2013 01 15 13 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 345886 MLO 2012 12 27 19 39 00 2024-99 P co CCGG 87.630 -999.990 ... V4 2013 01 15 14 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 345887 MLO 2012 12 27 20 10 00 1581-99 S co CCGG 87.560 -999.990 S.. V4 2013 01 15 13 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 345884 MLO 2012 12 27 20 10 00 1582-99 S co CCGG 88.170 -999.990 S.. V4 2013 01 15 13 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 345885 MLO 2013 01 03 20 05 00 2840-99 S co CCGG 90.150 -999.990 S.. V4 2013 01 23 12 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 346409 MLO 2013 01 03 20 05 00 691-99 S co CCGG 89.410 -999.990 S.. V4 2013 01 23 12 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 346408 MLO 2013 01 03 20 43 00 3983-99 P co CCGG 90.600 -999.990 ... V4 2013 01 23 13 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 346407 MLO 2013 01 03 20 43 00 4619-99 P co CCGG 90.550 -999.990 ... V4 2013 01 23 13 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 346406 MLO 2013 01 08 20 06 00 2113-99 P co CCGG 91.230 -999.990 ... V4 2013 01 24 09 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 346516 MLO 2013 01 08 20 06 00 2114-99 P co CCGG 91.670 -999.990 ... V4 2013 01 24 09 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 346517 MLO 2013 01 08 20 09 00 3939-99 S co CCGG 89.690 -999.990 S.. V4 2013 01 24 09 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 346514 MLO 2013 01 08 20 09 00 3940-99 S co CCGG 91.550 -999.990 S.. V4 2013 01 24 09 59 00 19.5362 -155.5763 3437.00 3397.00 40.00 346515 MLO 2013 01 15 20 07 00 2546-99 S co CCGG 88.060 -999.990 S.. V4 2013 01 28 12 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 346642 MLO 2013 01 15 20 07 00 5285-99 S co CCGG 88.720 -999.990 S.. V4 2013 01 28 12 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 346643 MLO 2013 01 15 20 41 00 2781-99 P co CCGG 87.020 -999.990 ... V2 2013 01 25 13 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 346644 MLO 2013 01 15 20 41 00 3992-99 P co CCGG 88.530 -999.990 ... V2 2013 01 25 13 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 346645 MLO 2013 01 22 20 08 00 119-99 S co CCGG 82.510 -999.990 S.. V2 2013 01 30 10 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 346857 MLO 2013 01 22 20 08 00 120-99 S co CCGG 83.180 -999.990 S.. V2 2013 01 30 10 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 346858 MLO 2013 01 22 20 34 00 1675-99 P co CCGG 78.880 -999.990 ... V4 2013 01 30 11 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 346859 MLO 2013 01 22 20 34 00 1676-99 P co CCGG 76.350 -999.990 ... V4 2013 01 30 11 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 346860 MLO 2013 01 29 19 38 00 4117-99 P co CCGG 98.290 -999.990 ... V2 2013 02 11 11 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 347281 MLO 2013 01 29 19 38 00 4118-99 P co CCGG 98.010 -999.990 ... V2 2013 02 11 11 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 347282 MLO 2013 01 29 20 08 00 475-99 S co CCGG 98.810 -999.990 S.. V2 2013 02 11 11 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 347279 MLO 2013 01 29 20 08 00 476-99 S co CCGG 96.370 -999.990 S.. V2 2013 02 11 11 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 347280 MLO 2013 02 05 20 04 00 3625-99 S co CCGG 127.180 -999.990 S.. V4 2013 02 13 15 59 00 19.5362 -155.5763 3437.00 3397.00 40.00 347625 MLO 2013 02 05 20 04 00 3626-99 S co CCGG 127.050 -999.990 S.. V4 2013 02 13 16 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 347626 MLO 2013 02 05 20 27 00 4637-99 P co CCGG 102.990 -999.990 -.. V4 2013 02 14 15 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 347627 MLO 2013 02 05 20 27 00 4638-99 P co CCGG 107.970 -999.990 +.. V4 2013 02 14 15 22 00 19.5362 -155.5763 3402.00 3397.00 5.00 347628 MLO 2013 02 12 20 04 00 360-99 S co CCGG 84.680 -999.990 S.. V2 2013 02 25 13 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 347967 MLO 2013 02 12 20 04 00 4414-99 S co CCGG 83.500 -999.990 S.. V2 2013 02 25 13 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 347968 MLO 2013 02 12 20 34 00 2533-99 P co CCGG 86.890 -999.990 ... V2 2013 02 25 13 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 347969 MLO 2013 02 12 20 34 00 452-99 P co CCGG 86.050 -999.990 ... V2 2013 02 25 12 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 347970 MLO 2013 02 19 20 06 00 1778-99 S co CCGG 114.160 -999.990 S.. V2 2013 03 07 13 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 348200 MLO 2013 02 19 20 06 00 2755-99 S co CCGG 112.980 -999.990 S.. V2 2013 03 07 12 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 348201 MLO 2013 02 19 20 40 00 1047-99 P co CCGG 113.420 -999.990 ... V2 2013 03 07 13 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 348202 MLO 2013 02 19 20 40 00 4111-99 P co CCGG 117.410 -999.990 ... V2 2013 03 07 13 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 348203 MLO 2013 02 26 20 10 00 439-99 S co CCGG 103.270 -999.990 S.. V2 2013 03 11 14 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 348445 MLO 2013 02 26 20 10 00 6395-66 S co CCGG 101.530 -999.990 S.. V2 2013 03 11 14 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 348446 MLO 2013 02 26 20 44 00 1702-99 P co CCGG 105.180 -999.990 ... V2 2013 03 11 13 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 348447 MLO 2013 02 26 20 44 00 350-99 P co CCGG 105.070 -999.990 ... V2 2013 03 11 13 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 348448 MLO 2013 03 05 19 45 00 3649-99 P co CCGG 126.840 -999.990 ... V4 2013 04 04 10 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 349513 MLO 2013 03 05 19 45 00 3650-99 P co CCGG 126.590 -999.990 ... V4 2013 04 04 11 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 349514 MLO 2013 03 05 20 07 00 2065-99 S co CCGG 131.560 -999.990 S.. V4 2013 04 04 10 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 349515 MLO 2013 03 05 20 07 00 2066-99 S co CCGG 129.630 -999.990 S.. V4 2013 04 04 10 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 349516 MLO 2013 03 12 20 02 00 13-99 P co CCGG 96.130 -999.990 ... V2 2013 03 25 11 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 348940 MLO 2013 03 12 20 02 00 2789-99 P co CCGG 94.610 -999.990 ... V2 2013 03 25 11 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 348941 MLO 2013 03 12 20 19 00 3022-99 S co CCGG 94.900 -999.990 S.. V2 2013 03 25 11 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 348942 MLO 2013 03 12 20 19 00 4853-99 S co CCGG 94.960 -999.990 S.. V2 2013 03 25 10 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 348943 MLO 2013 03 19 20 07 00 2666-99 S co CCGG 137.930 -999.990 S.. V2 2013 03 26 16 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 349330 MLO 2013 03 19 20 07 00 6366-66 S co CCGG 135.720 -999.990 S.. V2 2013 03 26 16 29 00 19.5362 -155.5763 3437.00 3397.00 40.00 349331 MLO 2013 03 19 20 29 00 3172-99 P co CCGG 129.890 -999.990 ... V2 2013 03 27 10 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 349329 MLO 2013 03 19 20 29 00 3533-99 P co CCGG 127.990 -999.990 ... V2 2013 03 27 10 22 00 19.5362 -155.5763 3402.00 3397.00 5.00 349328 MLO 2013 03 26 20 12 00 1029-99 S co CCGG 109.640 -999.990 S.. V4 2013 04 04 12 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 349631 MLO 2013 03 26 20 12 00 582-99 S co CCGG 110.460 -999.990 S.. V4 2013 04 04 11 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 349632 MLO 2013 03 26 20 31 00 5406-99 P co CCGG 108.360 -999.990 ... V4 2013 04 04 11 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 349633 MLO 2013 03 26 20 31 00 6162-66 P co CCGG 108.720 -999.990 ... V4 2013 04 04 11 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 349634 MLO 2013 04 02 19 40 00 4595-99 P co CCGG 116.380 -999.990 ... V4 2013 04 11 13 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 349983 MLO 2013 04 02 19 40 00 4756-99 P co CCGG 119.580 -999.990 ... V4 2013 04 11 14 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 349984 MLO 2013 04 02 20 04 00 3053-99 S co CCGG 133.540 -999.990 S.. V4 2013 04 11 13 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 349982 MLO 2013 04 02 20 04 00 746-99 S co CCGG 133.100 -999.990 S.. V4 2013 04 11 13 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 349981 MLO 2013 04 09 19 38 00 3443-99 P co CCGG 113.700 -999.990 ... V4 2013 04 22 16 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 350305 MLO 2013 04 09 19 38 00 3444-99 P co CCGG 112.990 -999.990 ... V4 2013 04 22 16 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 350306 MLO 2013 04 09 20 10 00 6559-66 S co CCGG 110.560 -999.990 S.. V4 2013 04 22 15 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 350307 MLO 2013 04 09 20 10 00 6560-66 S co CCGG 110.050 -999.990 S.. V4 2013 04 22 15 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 350308 MLO 2013 04 15 20 03 00 3271-99 S co CCGG 92.650 -999.990 S.. V4 2013 04 24 15 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 350485 MLO 2013 04 15 20 03 00 3272-99 S co CCGG 92.480 -999.990 S.. V4 2013 04 24 15 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 350486 MLO 2013 04 15 20 28 00 1521-99 P co CCGG 88.550 -999.990 ... V4 2013 04 24 15 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 350487 MLO 2013 04 15 20 28 00 1522-99 P co CCGG 90.560 -999.990 ... V4 2013 04 24 15 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 350488 MLO 2013 04 23 20 08 00 2413-99 S co CCGG 111.250 -999.990 S.. V4 2013 05 10 13 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 351166 MLO 2013 04 23 20 08 00 3767-99 S co CCGG 108.770 -999.990 S.. V4 2013 05 10 13 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 351167 MLO 2013 04 23 20 29 00 2732-99 P co CCGG 109.410 -999.990 ... V4 2013 05 13 14 37 00 19.5362 -155.5763 3402.00 3397.00 5.00 351165 MLO 2013 04 23 20 29 00 5171-99 P co CCGG 112.470 -999.990 ... V4 2013 05 13 14 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 351164 MLO 2013 04 30 19 02 00 158-99 S co CCGG 104.570 -999.990 S.. V2 2013 05 21 15 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 351526 MLO 2013 04 30 19 02 00 5424-99 S co CCGG 105.980 -999.990 S.. V2 2013 05 21 16 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 351527 MLO 2013 04 30 19 29 00 2951-99 P co CCGG 107.910 -999.990 ... V2 2013 05 21 15 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 351528 MLO 2013 04 30 19 29 00 5336-99 P co CCGG 103.660 -999.990 ... V2 2013 05 21 15 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 351529 MLO 2013 05 07 20 01 00 799-99 S co CCGG 97.690 -999.990 S.. V2 2013 05 23 15 58 00 19.5362 -155.5763 3437.00 3397.00 40.00 351818 MLO 2013 05 07 20 01 00 954-99 S co CCGG 97.650 -999.990 S.. V2 2013 05 23 16 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 351819 MLO 2013 05 07 20 23 00 3781-99 P co CCGG 97.840 -999.990 ... V2 2013 05 23 14 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 351816 MLO 2013 05 07 20 23 00 905-99 P co CCGG 98.680 -999.990 ... V2 2013 05 23 15 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 351817 MLO 2013 05 14 20 11 00 889-99 S co CCGG 87.420 -999.990 S.. V4 2013 05 29 16 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 352184 MLO 2013 05 14 20 11 00 911-99 S co CCGG 87.230 -999.990 S.. V4 2013 05 29 16 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 352185 MLO 2013 05 14 20 33 00 2685-99 P co CCGG 89.860 -999.990 ... V4 2013 05 29 16 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 352186 MLO 2013 05 14 20 33 00 3354-99 P co CCGG 89.100 -999.990 ... V4 2013 05 29 16 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 352187 MLO 2013 05 21 20 08 00 6061-66 S co CCGG 98.810 -999.990 S.. V2 2013 06 05 12 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 352420 MLO 2013 05 21 20 08 00 6062-66 S co CCGG 97.170 -999.990 S.. V2 2013 06 05 12 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 352421 MLO 2013 05 21 20 31 00 1801-99 P co CCGG 101.020 -999.990 ... V2 2013 06 05 12 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 352418 MLO 2013 05 21 20 31 00 1802-99 P co CCGG 98.860 -999.990 ... V2 2013 06 05 13 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 352419 MLO 2013 05 28 20 03 00 288-99 S co CCGG 97.640 -999.990 S.. V2 2013 06 10 15 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 352899 MLO 2013 05 28 20 03 00 6509-66 S co CCGG 94.800 -999.990 S.. V2 2013 06 10 15 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 352900 MLO 2013 05 28 20 32 00 2155-99 P co CCGG 95.300 -999.990 ... V2 2013 06 10 15 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 352901 MLO 2013 05 28 20 32 00 4241-99 P co CCGG 94.520 -999.990 ... V2 2013 06 10 15 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 352902 MLO 2013 06 04 20 09 00 281-99 S co CCGG 70.440 -999.990 S.. V2 2013 06 12 15 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 353279 MLO 2013 06 04 20 09 00 282-99 S co CCGG 69.650 -999.990 S.. V2 2013 06 12 16 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 353280 MLO 2013 06 04 20 36 00 4145-99 P co CCGG 70.680 -999.990 ... V2 2013 06 12 15 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 353277 MLO 2013 06 04 20 36 00 4146-99 P co CCGG 72.310 -999.990 ... V2 2013 06 12 15 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 353278 MLO 2013 06 11 20 06 00 4297-99 S co CCGG 71.190 -999.990 S.. V4 2013 06 20 10 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 353597 MLO 2013 06 11 20 06 00 4298-99 S co CCGG 70.620 -999.990 S.. V4 2013 06 20 10 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 353598 MLO 2013 06 11 20 35 00 4445-99 P co CCGG 72.840 -999.990 ... V4 2013 06 20 10 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 353599 MLO 2013 06 11 20 35 00 4446-99 P co CCGG 72.810 -999.990 ... V4 2013 06 20 10 22 00 19.5362 -155.5763 3402.00 3397.00 5.00 353600 MLO 2013 06 18 20 05 00 1461-99 S co CCGG 74.170 -999.990 S.. V2 2013 07 08 13 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 353869 MLO 2013 06 18 20 05 00 4407-99 S co CCGG 71.380 -999.990 S.. V2 2013 07 08 13 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 353868 MLO 2013 06 18 20 28 00 1009-99 P co CCGG 72.740 -999.990 -.. V2 2013 07 08 12 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 353867 MLO 2013 06 18 20 28 00 5074-99 P co CCGG 75.770 -999.990 +.. V2 2013 07 08 12 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 353866 MLO 2013 06 25 20 03 00 1176-99 S co CCGG 70.410 -999.990 S.. V4 2013 07 15 11 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 354255 MLO 2013 06 25 20 03 00 3057-99 S co CCGG 71.480 -999.990 S.. V4 2013 07 15 11 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 354256 MLO 2013 06 25 20 26 00 1867-99 P co CCGG 74.110 -999.990 ... V4 2013 07 15 12 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 354233 MLO 2013 06 25 20 26 00 4555-99 P co CCGG 72.570 -999.990 ... V4 2013 07 15 11 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 354234 MLO 2013 07 02 20 10 00 5259-99 S co CCGG 74.320 -999.990 S.. V4 2013 07 24 12 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 354582 MLO 2013 07 02 20 10 00 5260-99 S co CCGG 73.280 -999.990 S.. V4 2013 07 24 12 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 354583 MLO 2013 07 02 20 35 00 6761-66 P co CCGG 76.950 -999.990 ... V4 2013 07 24 11 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 354580 MLO 2013 07 02 20 35 00 6762-66 P co CCGG 77.410 -999.990 ... V4 2013 07 24 12 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 354581 MLO 2013 07 09 20 08 00 1409-99 S co CCGG 67.480 -999.990 S.. V4 2013 07 30 16 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 354864 MLO 2013 07 09 20 08 00 2334-99 S co CCGG 67.820 -999.990 S.. V4 2013 07 30 16 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 354863 MLO 2013 07 09 20 52 00 1094-99 P co CCGG 69.600 -999.990 ... V4 2013 07 30 15 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 354861 MLO 2013 07 09 20 52 00 4983-99 P co CCGG 69.250 -999.990 ... V4 2013 07 30 15 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 354862 MLO 2013 07 16 20 07 00 1379-99 S co CCGG 66.810 -999.990 S.. V4 2013 08 05 15 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 355220 MLO 2013 07 16 20 07 00 1380-99 S co CCGG 67.590 -999.990 S.. V4 2013 08 05 15 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 355221 MLO 2013 07 16 20 44 00 1331-99 P co CCGG 68.990 -999.990 ... V4 2013 08 05 15 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 355222 MLO 2013 07 16 20 44 00 1332-99 P co CCGG 68.830 -999.990 ... V4 2013 08 05 15 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 355223 MLO 2013 07 23 19 44 00 4969-99 P co CCGG 62.570 -999.990 ... V4 2013 08 08 15 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 355531 MLO 2013 07 23 19 44 00 4970-99 P co CCGG 61.690 -999.990 ... V4 2013 08 08 15 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 355530 MLO 2013 07 23 20 04 00 777-99 S co CCGG 60.720 -999.990 S.. V4 2013 08 08 14 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 355532 MLO 2013 07 23 20 04 00 778-99 S co CCGG 60.410 -999.990 S.. V4 2013 08 08 14 58 00 19.5362 -155.5763 3437.00 3397.00 40.00 355533 MLO 2013 07 30 19 43 00 238-99 P co CCGG 62.470 -999.990 ... V4 2013 08 15 14 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 355925 MLO 2013 07 30 19 43 00 5150-99 P co CCGG 62.420 -999.990 ... V4 2013 08 15 14 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 355924 MLO 2013 07 30 20 17 00 1315-99 S co CCGG 62.120 -999.990 S.. V4 2013 08 15 14 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 355926 MLO 2013 07 30 20 17 00 4561-99 S co CCGG 61.240 -999.990 S.. V4 2013 08 15 13 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 355927 MLO 2013 08 06 20 12 00 2841-99 S co CCGG 63.510 -999.990 S.. V4 2013 08 19 12 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 356167 MLO 2013 08 06 20 12 00 2842-99 S co CCGG 63.200 -999.990 S.. V4 2013 08 19 12 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 356168 MLO 2013 08 06 20 39 00 5331-99 P co CCGG 63.820 -999.990 ... V4 2013 08 19 12 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 356165 MLO 2013 08 06 20 39 00 5332-99 P co CCGG 63.980 -999.990 ... V4 2013 08 19 12 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 356166 MLO 2013 08 13 19 44 00 2633-99 P co CCGG 72.520 -999.990 ... V4 2013 08 28 09 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 356659 MLO 2013 08 13 19 44 00 2634-99 P co CCGG 71.810 -999.990 S.. V4 2013 08 28 09 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 356660 MLO 2013 08 13 21 02 00 1111-99 S co CCGG 69.890 -999.990 S.. V4 2013 08 28 10 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 356661 MLO 2013 08 13 21 02 00 1112-99 S co CCGG 70.360 -999.990 S.. V4 2013 08 28 10 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 356662 MLO 2013 08 20 20 03 00 3531-99 S co CCGG 66.360 -999.990 S.. V4 2013 09 26 09 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 357011 MLO 2013 08 20 20 03 00 3532-99 S co CCGG 65.420 -999.990 S.. V4 2013 09 26 09 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 357012 MLO 2013 08 20 20 32 00 2013-99 P co CCGG 69.230 -999.990 ... V3 2013 09 25 16 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 357013 MLO 2013 08 20 20 32 00 2014-99 P co CCGG 68.920 -999.990 ... V3 2013 09 25 16 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 357014 MLO 2013 08 27 20 06 00 6017-66 S co CCGG 66.380 -999.990 S.. V3 2013 09 27 11 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 357289 MLO 2013 08 27 20 06 00 6072-66 S co CCGG 66.250 -999.990 S.. V3 2013 09 27 12 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 357290 MLO 2013 08 27 20 33 00 4758-99 P co CCGG 67.290 -999.990 ... V3 2013 09 27 12 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 357287 MLO 2013 08 27 20 33 00 76-99 P co CCGG 68.190 -999.990 ... V3 2013 09 27 12 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 357288 MLO 2013 09 03 20 04 00 1993-99 S co CCGG 62.650 -999.990 S.. V3 2013 10 17 13 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 357539 MLO 2013 09 03 20 04 00 463-99 S co CCGG 62.820 -999.990 S.. V3 2013 10 17 13 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 357540 MLO 2013 09 03 20 34 00 4081-99 P co CCGG 65.820 -999.990 ... V4 2013 10 17 13 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 357537 MLO 2013 09 03 20 34 00 6368-66 P co CCGG 66.090 -999.990 ... V4 2013 10 17 13 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 357538 MLO 2013 09 10 19 36 00 3803-99 P co CCGG 75.500 -999.990 ... V3 2013 10 21 14 37 00 19.5362 -155.5763 3402.00 3397.00 5.00 357754 MLO 2013 09 10 19 36 00 3804-99 P co CCGG 75.840 -999.990 ... V3 2013 10 21 14 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 357755 MLO 2013 09 10 20 06 00 4785-99 S co CCGG 77.670 -999.990 S.. V3 2013 10 21 14 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 357756 MLO 2013 09 10 20 06 00 4786-99 S co CCGG 75.610 -999.990 S.. V3 2013 10 21 14 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 357757 MLO 2013 09 17 20 07 00 6559-66 S co CCGG 85.110 -999.990 S.. V4 2013 10 31 14 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 358371 MLO 2013 09 17 20 07 00 6560-66 S co CCGG 84.550 -999.990 S.. V4 2013 10 31 14 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 358372 MLO 2013 09 17 20 30 00 2065-99 P co CCGG 90.310 -999.990 ... V4 2013 10 31 13 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 358369 MLO 2013 09 17 20 30 00 2066-99 P co CCGG 91.670 -999.990 ... V4 2013 10 31 14 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 358370 MLO 2013 09 24 20 05 00 2311-99 S co CCGG 78.420 -999.990 S.. V3 2013 10 28 13 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 358667 MLO 2013 09 24 20 05 00 2312-99 S co CCGG 77.730 -999.990 S.. V3 2013 10 28 13 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 358668 MLO 2013 09 24 20 40 00 6397-66 P co CCGG 88.160 -999.990 ... V3 2013 10 28 12 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 358665 MLO 2013 09 24 20 40 00 6398-66 P co CCGG 87.930 -999.990 ... V3 2013 10 28 12 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 358666 MLO 2013 10 03 20 01 00 4747-99 S co CCGG 76.680 -999.990 S.. V4 2013 11 01 09 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 358736 MLO 2013 10 03 20 01 00 4748-99 S co CCGG 76.640 -999.990 S.. V4 2013 11 01 09 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 358737 MLO 2013 10 03 20 32 00 3687-99 P co CCGG 78.570 -999.990 ... V4 2013 11 01 09 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 358734 MLO 2013 10 03 20 32 00 3688-99 P co CCGG 79.560 -999.990 ... V4 2013 11 01 10 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 358735 MLO 2013 10 08 20 15 00 1521-99 S co CCGG 73.220 -999.990 S.. V3 2013 10 28 10 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 358651 MLO 2013 10 08 20 15 00 1522-99 S co CCGG 72.800 -999.990 S.. V3 2013 10 28 11 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 358652 MLO 2013 10 08 20 47 00 3351-99 P co CCGG 78.810 -999.990 ... V4 2013 10 28 11 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 358649 MLO 2013 10 08 20 47 00 3352-99 P co CCGG 77.980 -999.990 ... V4 2013 10 28 12 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 358650 MLO 2013 10 15 20 08 00 1455-99 S co CCGG 73.500 -999.990 S.. V3 2013 11 08 13 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 358901 MLO 2013 10 15 20 08 00 1456-99 S co CCGG 73.140 -999.990 S.. V3 2013 11 08 14 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 358902 MLO 2013 10 15 20 39 00 5031-99 P co CCGG 75.360 -999.990 ... V3 2013 11 08 14 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 358899 MLO 2013 10 15 20 39 00 5032-99 P co CCGG 75.940 -999.990 ... V3 2013 11 08 14 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 358900 MLO 2013 10 22 20 04 00 781-99 S co CCGG 75.050 -999.990 S.. V3 2013 11 07 13 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 359386 MLO 2013 10 22 20 04 00 782-99 S co CCGG 75.540 -999.990 S.. V3 2013 11 07 13 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 359387 MLO 2013 10 22 20 26 00 3913-99 P co CCGG 78.370 -999.990 ... V3 2013 11 07 13 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 359384 MLO 2013 10 22 20 26 00 3914-99 P co CCGG 78.230 -999.990 ... V3 2013 11 07 13 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 359385 MLO 2013 10 29 20 05 00 5339-99 S co CCGG 79.680 -999.990 S.. V3 2013 11 19 12 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 359849 MLO 2013 10 29 20 05 00 5340-99 S co CCGG 79.530 -999.990 S.. V3 2013 11 19 12 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 359850 MLO 2013 10 29 20 36 00 3515-99 P co CCGG 82.220 -999.990 ... V3 2013 11 19 11 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 359847 MLO 2013 10 29 20 36 00 3516-99 P co CCGG 82.940 -999.990 ... V3 2013 11 19 11 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 359848 MLO 2013 11 05 20 07 00 4758-99 S co CCGG 69.770 -999.990 S.. V4 2013 11 19 14 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 360037 MLO 2013 11 05 20 07 00 76-99 S co CCGG 70.110 -999.990 S.. V4 2013 11 19 15 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 360038 MLO 2013 11 05 20 38 00 1726-99 P co CCGG 73.690 -999.990 ... V3 2013 11 19 14 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 360035 MLO 2013 11 05 20 38 00 3459-99 P co CCGG 73.020 -999.990 ... V3 2013 11 19 15 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 360036 MLO 2013 11 12 20 01 00 168-99 S co CCGG 95.420 -999.990 S.. V4 2013 11 25 11 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 360385 MLO 2013 11 12 20 01 00 3366-99 S co CCGG 94.570 -999.990 S.. V4 2013 11 25 10 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 360386 MLO 2013 11 12 20 30 00 349-99 P co CCGG 93.880 -999.990 ... V4 2013 11 25 11 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 360383 MLO 2013 11 12 20 30 00 4284-99 P co CCGG 95.120 -999.990 ... V4 2013 11 25 11 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 360384 MLO 2013 11 19 20 04 00 3073-99 S co CCGG 62.520 -999.990 S.. V4 2013 11 27 09 59 00 19.5362 -155.5763 3437.00 3397.00 40.00 360691 MLO 2013 11 19 20 04 00 3074-99 S co CCGG 62.300 -999.990 S.. V4 2013 11 27 10 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 360692 MLO 2013 11 19 20 26 00 2101-99 P co CCGG 66.500 -999.990 ... V4 2013 11 27 10 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 360689 MLO 2013 11 19 20 26 00 2102-99 P co CCGG 66.710 -999.990 ... V4 2013 11 27 10 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 360690 MLO 2013 11 26 20 03 00 3674-99 S co CCGG 88.620 -999.990 S.. V4 2013 12 04 15 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 361014 MLO 2013 11 26 20 03 00 754-99 S co CCGG 88.800 -999.990 S.. V4 2013 12 04 15 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 361015 MLO 2013 11 26 20 28 00 2407-99 P co CCGG 90.490 -999.990 -.. V4 2013 12 04 15 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 361016 MLO 2013 11 26 20 28 00 740-99 P co CCGG 93.500 -999.990 +.. V4 2013 12 04 15 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 361017 MLO 2013 12 03 20 02 00 6193-66 S co CCGG 86.060 -999.990 S.. V4 2013 12 17 11 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 361592 MLO 2013 12 03 20 02 00 6194-66 S co CCGG 85.100 -999.990 S.. V4 2013 12 17 12 09 00 19.5362 -155.5763 3437.00 3397.00 40.00 361593 MLO 2013 12 03 20 24 00 1651-99 P co CCGG 84.890 -999.990 ... V4 2013 12 17 12 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 361595 MLO 2013 12 03 20 24 00 1652-99 P co CCGG 85.940 -999.990 ... V4 2013 12 17 12 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 361594 MLO 2013 12 10 19 59 00 5379-99 S co CCGG 67.180 -999.990 S.. V3 2013 12 19 16 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 361698 MLO 2013 12 10 19 59 00 5380-99 S co CCGG 67.480 -999.990 S.. V3 2013 12 19 16 59 00 19.5362 -155.5763 3437.00 3397.00 40.00 361699 MLO 2013 12 10 20 21 00 2159-99 P co CCGG 73.340 -999.990 ... V3 2013 12 19 16 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 361696 MLO 2013 12 10 20 21 00 2160-99 P co CCGG 74.180 -999.990 ... V3 2013 12 19 16 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 361697 MLO 2013 12 17 20 05 00 107-99 S co CCGG 131.320 -999.990 S.. V4 2014 01 02 14 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 362124 MLO 2013 12 17 20 05 00 6162-66 S co CCGG 131.120 -999.990 S.. V4 2014 01 02 14 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 362123 MLO 2013 12 17 20 27 00 219-99 P co CCGG 131.840 -999.990 .X. V4 2014 01 02 15 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 362122 MLO 2013 12 17 20 27 00 653-99 P co CCGG 131.760 -999.990 .X. V4 2014 01 02 15 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 362121 MLO 2013 12 24 20 02 00 113-99 S co CCGG 89.200 -999.990 S.. V4 2014 01 07 11 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 362132 MLO 2013 12 24 20 02 00 908-99 S co CCGG 89.850 -999.990 S.. V4 2014 01 07 11 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 362131 MLO 2013 12 24 20 24 00 610-99 P co CCGG 89.960 -999.990 ... V4 2014 01 07 11 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 362130 MLO 2013 12 24 20 24 00 69-99 P co CCGG 90.480 -999.990 ... V4 2014 01 07 11 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 362129 MLO 2013 12 31 20 11 00 3245-99 S co CCGG 87.940 -999.990 S.. V4 2014 01 15 11 50 00 19.5362 -155.5763 3437.00 3397.00 40.00 362492 MLO 2013 12 31 20 11 00 3246-99 S co CCGG 87.090 -999.990 S.. V4 2014 01 15 12 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 362493 MLO 2013 12 31 20 41 00 3001-99 P co CCGG 88.520 -999.990 ... V4 2014 01 15 12 22 00 19.5362 -155.5763 3402.00 3397.00 5.00 362494 MLO 2013 12 31 20 41 00 3002-99 P co CCGG 87.120 -999.990 ... V4 2014 01 15 12 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 362495 MLO 2014 01 07 20 01 00 4537-99 S co CCGG 97.930 -999.990 S.. V4 2014 01 27 14 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 362864 MLO 2014 01 07 20 01 00 4538-99 S co CCGG 97.790 -999.990 S.. V4 2014 01 27 14 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 362865 MLO 2014 01 07 20 32 00 71-99 P co CCGG 97.010 -999.990 ... V4 2014 01 27 13 40 00 19.5362 -155.5763 3402.00 3397.00 5.00 362862 MLO 2014 01 07 20 32 00 72-99 P co CCGG 96.390 -999.990 ... V4 2014 01 27 13 56 00 19.5362 -155.5763 3402.00 3397.00 5.00 362863 MLO 2014 01 14 20 04 00 1837-99 S co CCGG 81.450 -999.990 S.. V3 2014 02 04 10 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 363176 MLO 2014 01 14 20 04 00 1838-99 S co CCGG 81.360 -999.990 S.. V3 2014 02 04 10 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 363177 MLO 2014 01 14 20 20 00 4585-99 P co CCGG 83.140 -999.990 ... V3 2014 02 04 10 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 363174 MLO 2014 01 14 20 20 00 4586-99 P co CCGG 82.660 -999.990 ... V3 2014 02 04 11 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 363175 MLO 2014 01 21 20 02 00 4443-99 S co CCGG 99.800 -999.990 S.. V3 2014 02 07 13 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 363533 MLO 2014 01 21 20 02 00 4444-99 S co CCGG 98.610 -999.990 S.. V3 2014 02 07 13 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 363534 MLO 2014 01 21 20 24 00 4037-99 P co CCGG 98.850 -999.990 ... V3 2014 02 07 12 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 363531 MLO 2014 01 21 20 24 00 4038-99 P co CCGG 99.310 -999.990 ... V3 2014 02 07 13 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 363532 MLO 2014 01 28 20 08 00 6607-66 S co CCGG 107.760 -999.990 S.. V4 2014 02 20 13 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 364109 MLO 2014 01 28 20 08 00 6608-66 S co CCGG 105.510 -999.990 S.. V4 2014 02 20 13 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 364110 MLO 2014 01 30 20 39 00 4889-99 P co CCGG 89.190 -999.990 ... V4 2014 02 20 13 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 364107 MLO 2014 01 30 20 39 00 4890-99 P co CCGG 87.980 -999.990 ... V4 2014 02 20 13 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 364108 MLO 2014 02 04 20 04 00 1465-99 S co CCGG 80.480 -999.990 S.. V3 2014 02 21 14 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 364069 MLO 2014 02 04 20 04 00 1466-99 S co CCGG 80.250 -999.990 S.. V3 2014 02 21 14 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 364070 MLO 2014 02 04 20 28 00 2627-99 P co CCGG 82.880 -999.990 ... V3 2014 02 21 14 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 364067 MLO 2014 02 04 20 28 00 2628-99 P co CCGG 82.840 -999.990 ... V3 2014 02 21 14 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 364068 MLO 2014 02 11 20 04 00 765-99 S co CCGG 72.530 -999.990 S.. V3 2014 02 25 12 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 364427 MLO 2014 02 11 20 04 00 888-99 S co CCGG 72.820 -999.990 S.. V3 2014 02 25 12 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 364426 MLO 2014 02 11 20 30 00 459-99 P co CCGG 74.380 -999.990 ... V3 2014 02 25 11 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 364428 MLO 2014 02 11 20 30 00 6480-66 P co CCGG 74.060 -999.990 ... V3 2014 02 25 11 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 364429 MLO 2014 02 18 20 03 00 4987-99 S co CCGG 89.090 -999.990 S.. V3 2014 02 27 14 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 364719 MLO 2014 02 18 20 03 00 4988-99 S co CCGG 89.240 -999.990 S.. V3 2014 02 27 15 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 364720 MLO 2014 02 18 20 32 00 1405-99 P co CCGG 88.690 -999.990 ... V4 2014 02 27 15 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 364717 MLO 2014 02 18 20 32 00 1406-99 P co CCGG 87.590 -999.990 ... V4 2014 02 27 15 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 364718 MLO 2014 02 25 19 19 00 4781-99 P co CCGG 83.140 -999.990 ... V3 2014 03 04 14 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 365021 MLO 2014 02 25 19 19 00 4782-99 P co CCGG 82.960 -999.990 ... V3 2014 03 04 14 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 365022 MLO 2014 02 25 20 01 00 3711-99 S co CCGG 81.860 -999.990 S.. V3 2014 03 04 15 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 365019 MLO 2014 02 25 20 01 00 3712-99 S co CCGG 82.410 -999.990 S.. V3 2014 03 04 15 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 365020 MLO 2014 03 06 20 40 00 4280-99 P co CCGG 98.600 -999.990 ... V4 2014 03 12 13 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 365241 MLO 2014 03 06 20 40 00 4789-99 P co CCGG 97.800 -999.990 ... V4 2014 03 12 13 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 365242 MLO 2014 03 06 22 14 00 4285-99 S co CCGG 97.590 -999.990 S.. V4 2014 03 12 14 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 365240 MLO 2014 03 06 22 14 00 5206-99 S co CCGG 98.120 -999.990 S.. V4 2014 03 12 13 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 365239 MLO 2014 03 11 19 14 00 1842-99 S co CCGG 102.980 -999.990 S.. V3 2014 03 20 08 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 365592 MLO 2014 03 11 19 14 00 6398-66 S co CCGG 104.310 -999.990 S.. V3 2014 03 20 09 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 365593 MLO 2014 03 11 19 50 00 6765-66 P co CCGG 105.030 -999.990 ... V3 2014 03 20 09 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 365579 MLO 2014 03 11 19 50 00 894-99 P co CCGG 105.830 -999.990 ... V3 2014 03 20 09 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 365580 MLO 2014 03 18 20 08 00 2289-99 S co CCGG 158.640 -999.990 S.. V4 2014 04 03 12 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 365952 MLO 2014 03 18 20 08 00 2290-99 S co CCGG 159.190 -999.990 S.. V4 2014 04 03 12 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 365953 MLO 2014 03 18 21 21 00 6157-66 P co CCGG 162.470 -999.990 .X. V4 2014 04 03 12 37 00 19.5362 -155.5763 3402.00 3397.00 5.00 365950 MLO 2014 03 18 21 21 00 6158-66 P co CCGG 163.510 -999.990 .X. V4 2014 04 03 12 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 365951 MLO 2014 03 25 19 12 00 1071-99 S co CCGG 108.260 -999.990 S.. V4 2014 04 08 10 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 366162 MLO 2014 03 25 19 12 00 1072-99 S co CCGG 108.660 -999.990 S.. V4 2014 04 08 11 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 366163 MLO 2014 03 25 19 42 00 295-99 P co CCGG 99.860 -999.990 ... V4 2014 04 08 11 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 366164 MLO 2014 03 25 19 42 00 296-99 P co CCGG 100.950 -999.990 ... V4 2014 04 08 11 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 366165 MLO 2014 04 02 20 10 00 6089-66 S co CCGG 112.340 -999.990 S.. V4 2014 04 11 14 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 366478 MLO 2014 04 02 20 10 00 6090-66 S co CCGG 112.710 -999.990 S.. V4 2014 04 11 14 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 366479 MLO 2014 04 02 21 02 00 2509-99 P co CCGG 113.480 -999.990 ... V4 2014 04 11 14 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 366480 MLO 2014 04 02 21 02 00 2510-99 P co CCGG 114.220 -999.990 ... V4 2014 04 11 14 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 366481 MLO 2014 04 08 20 05 00 2429-99 S co CCGG 133.050 -999.990 S.. V4 2014 04 17 11 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 366706 MLO 2014 04 08 20 05 00 2430-99 S co CCGG 132.290 -999.990 S.. V4 2014 04 17 11 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 366707 MLO 2014 04 08 20 34 00 4543-99 P co CCGG 131.390 -999.990 ... V4 2014 04 17 11 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 366708 MLO 2014 04 08 20 34 00 4544-99 P co CCGG 131.230 -999.990 ... V4 2014 04 17 11 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 366709 MLO 2014 04 15 20 02 00 3949-99 S co CCGG 118.300 -999.990 S.. V4 2014 04 28 11 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 367065 MLO 2014 04 15 20 02 00 522-99 S co CCGG 118.620 -999.990 S.. V4 2014 04 28 11 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 367066 MLO 2014 04 15 20 24 00 2767-99 P co CCGG 119.000 -999.990 ... V4 2014 04 28 12 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 367064 MLO 2014 04 15 20 24 00 992-99 P co CCGG 118.910 -999.990 ... V4 2014 04 28 11 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 367063 MLO 2014 04 22 20 04 00 1184-99 S co CCGG 107.970 -999.990 S.. V4 2014 05 05 10 29 00 19.5362 -155.5763 3437.00 3397.00 40.00 367246 MLO 2014 04 22 20 04 00 5426-99 S co CCGG 107.500 -999.990 S.. V4 2014 05 05 10 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 367247 MLO 2014 04 22 20 27 00 4314-99 P co CCGG 110.640 -999.990 ... V4 2014 05 05 11 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 367248 MLO 2014 04 22 20 27 00 459-99 P co CCGG 110.540 -999.990 ... V4 2014 05 05 11 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 367249 MLO 2014 04 28 20 03 00 1293-99 S co CCGG 115.830 -999.990 S.. V4 2014 05 07 11 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 367363 MLO 2014 04 28 20 03 00 3296-99 S co CCGG 114.900 -999.990 S.. V4 2014 05 07 12 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 367364 MLO 2014 04 28 20 32 00 4325-99 P co CCGG 114.820 -999.990 ... V4 2014 05 07 11 15 00 19.5362 -155.5763 3402.00 3397.00 5.00 367365 MLO 2014 04 28 20 32 00 5119-99 P co CCGG 113.900 -999.990 ... V4 2014 05 07 11 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 367366 MLO 2014 05 06 19 08 00 3028-99 S co CCGG 121.370 -999.990 S.. V4 2014 07 07 13 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 369884 MLO 2014 05 06 19 08 00 6638-66 S co CCGG 119.590 -999.990 S.. V4 2014 07 07 13 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 369883 MLO 2014 05 06 19 32 00 2463-99 P co CCGG 119.620 -999.990 ... V4 2014 07 07 14 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 369881 MLO 2014 05 06 19 32 00 4700-99 P co CCGG 119.750 -999.990 ... V4 2014 07 07 15 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 369882 MLO 2014 05 13 19 07 00 2300-99 S co CCGG 96.790 -999.990 S.. V4 2014 06 10 13 58 00 19.5362 -155.5763 3437.00 3397.00 40.00 368554 MLO 2014 05 13 19 07 00 4415-99 S co CCGG 96.260 -999.990 S.. V4 2014 06 10 13 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 368553 MLO 2014 05 13 19 49 00 1479-99 P co CCGG 100.380 -999.990 ... V4 2014 06 10 13 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 368552 MLO 2014 05 13 19 49 00 673-99 P co CCGG 101.950 -999.990 ... V4 2014 06 10 13 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 368551 MLO 2014 05 20 20 03 00 3072-99 S co CCGG 101.730 -999.990 S.. V4 2014 06 11 14 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 368731 MLO 2014 05 20 20 03 00 5190-99 S co CCGG 100.490 -999.990 S.. V4 2014 06 11 14 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 368732 MLO 2014 05 20 20 36 00 1747-99 P co CCGG 101.140 -999.990 ... V4 2014 06 11 13 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 368730 MLO 2014 05 20 20 36 00 770-99 P co CCGG 100.760 -999.990 ... V4 2014 06 11 13 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 368729 MLO 2014 05 27 19 39 00 5193-99 P co CCGG 87.840 -999.990 ... V4 2014 06 20 10 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 369091 MLO 2014 05 27 19 39 00 5381-99 P co CCGG 88.040 -999.990 ... V4 2014 06 20 10 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 369092 MLO 2014 05 27 20 05 00 4761-99 S co CCGG 88.840 -999.990 S.. V4 2014 06 20 10 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 369093 MLO 2014 05 27 20 05 00 5310-99 S co CCGG 88.840 -999.990 S.. V4 2014 06 20 10 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 369094 MLO 2014 06 03 19 36 00 4384-99 P co CCGG 93.420 -999.990 ... V4 2014 06 25 12 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 369255 MLO 2014 06 03 19 36 00 6572-66 P co CCGG 93.940 -999.990 ... V4 2014 06 25 13 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 369256 MLO 2014 06 03 20 08 00 2584-99 S co CCGG 91.520 -999.990 S.. V4 2014 06 25 13 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 369257 MLO 2014 06 03 20 08 00 5320-99 S co CCGG 90.960 -999.990 S.. V4 2014 06 25 13 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 369258 MLO 2014 06 10 19 33 00 1462-99 P co CCGG 80.960 -999.990 ... V4 2014 07 07 12 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 369786 MLO 2014 06 10 19 33 00 4607-99 P co CCGG 80.370 -999.990 ... V4 2014 07 07 12 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 369787 MLO 2014 06 10 20 09 00 4302-99 S co CCGG 80.970 -999.990 S.. V4 2014 07 07 13 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 369788 MLO 2014 06 10 20 09 00 6596-66 S co CCGG 81.960 -999.990 S.. V4 2014 07 07 13 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 369789 MLO 2014 06 17 19 16 00 3439-99 P co CCGG 79.080 -999.990 ... V4 2014 07 10 12 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 369977 MLO 2014 06 17 19 16 00 3440-99 P co CCGG 79.700 -999.990 ... V4 2014 07 10 12 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 369978 MLO 2014 06 17 20 03 00 4419-99 S co CCGG 80.080 -999.990 S.. V4 2014 07 10 11 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 369979 MLO 2014 06 17 20 03 00 4420-99 S co CCGG 79.630 -999.990 S.. V4 2014 07 10 12 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 369980 MLO 2014 06 24 20 19 00 819-99 S co CCGG 75.530 -999.990 S.. V4 2014 07 16 13 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 370299 MLO 2014 06 24 20 19 00 849-99 S co CCGG 75.140 -999.990 S.. V4 2014 07 16 14 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 370300 MLO 2014 06 24 20 37 00 3005-99 P co CCGG 75.370 -999.990 ... V4 2014 07 16 14 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 370297 MLO 2014 06 24 20 37 00 3745-99 P co CCGG 75.240 -999.990 ... V4 2014 07 16 14 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 370298 MLO 2014 07 01 20 02 00 2187-99 S co CCGG 66.330 -999.990 S.. V4 2014 07 18 10 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 370516 MLO 2014 07 01 20 02 00 2188-99 S co CCGG 66.790 -999.990 S.. V4 2014 07 18 11 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 370517 MLO 2014 07 01 20 25 00 6061-66 P co CCGG 67.730 -999.990 ... V4 2014 07 18 10 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 370514 MLO 2014 07 01 20 25 00 6062-66 P co CCGG 67.310 -999.990 ... V4 2014 07 18 10 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 370515 MLO 2014 07 08 19 40 00 1737-99 P co CCGG 74.390 -999.990 ... V4 2014 07 24 10 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 370833 MLO 2014 07 08 19 40 00 1738-99 P co CCGG 74.530 -999.990 ... V4 2014 07 24 11 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 370834 MLO 2014 07 08 20 01 00 2771-99 S co CCGG 73.910 -999.990 S.. V4 2014 07 24 10 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 370835 MLO 2014 07 08 20 01 00 2772-99 S co CCGG 73.990 -999.990 S.. V4 2014 07 24 10 32 00 19.5362 -155.5763 3437.00 3397.00 40.00 370836 MLO 2014 07 15 20 02 00 611-99 S co CCGG 64.800 -999.990 S.. V4 2014 07 31 10 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 371231 MLO 2014 07 15 20 02 00 612-99 S co CCGG 64.850 -999.990 S.. V4 2014 07 31 10 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 371232 MLO 2014 07 15 20 45 00 729-99 P co CCGG 65.880 -999.990 ... V4 2014 07 31 10 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 371233 MLO 2014 07 15 20 45 00 730-99 P co CCGG 66.300 -999.990 ... V4 2014 07 31 10 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 371234 MLO 2014 07 22 20 01 00 4382-99 S co CCGG 64.560 -999.990 S.. V4 2014 08 05 14 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 371483 MLO 2014 07 22 20 01 00 669-99 S co CCGG 64.530 -999.990 S.. V4 2014 08 05 14 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 371482 MLO 2014 07 22 20 26 00 1554-99 P co CCGG 63.510 -999.990 ... V4 2014 08 11 13 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 371639 MLO 2014 07 22 20 26 00 3937-99 P co CCGG 64.000 -999.990 ... V4 2014 08 11 13 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 371640 MLO 2014 07 29 20 02 00 5222-99 S co CCGG 64.970 -999.990 S.. V4 2014 08 14 16 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 371963 MLO 2014 07 29 20 02 00 6510-66 S co CCGG 65.700 -999.990 S.. V4 2014 08 14 15 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 371964 MLO 2014 07 29 20 26 00 2185-99 P co CCGG 66.770 -999.990 ... V4 2014 08 14 16 18 00 19.5362 -155.5763 3402.00 3397.00 5.00 371961 MLO 2014 07 29 20 26 00 2629-99 P co CCGG 66.000 -999.990 ... V4 2014 08 14 16 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 371962 MLO 2014 08 05 20 03 00 1431-99 S co CCGG 64.290 -999.990 S.. V4 2014 08 20 09 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 372284 MLO 2014 08 05 20 03 00 528-99 S co CCGG 63.690 -999.990 S.. V4 2014 08 20 09 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 372283 MLO 2014 08 05 20 30 00 2446-99 P co CCGG 66.730 -999.990 ... V4 2014 08 20 09 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 372281 MLO 2014 08 05 20 30 00 3827-99 P co CCGG 66.520 -999.990 ... V4 2014 08 20 10 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 372282 MLO 2014 08 12 20 02 00 4259-99 S co CCGG 65.000 -999.990 S.. V4 2014 08 27 09 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 372878 MLO 2014 08 12 20 32 00 3467-99 P co CCGG 69.360 -999.990 ... V4 2014 08 26 13 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 372879 MLO 2014 08 12 20 32 00 3468-99 P co CCGG 69.310 -999.990 ... V4 2014 08 26 14 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 372880 MLO 2014 08 19 20 05 00 1465-99 S co CCGG 73.440 -999.990 S.. V4 2014 09 08 14 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 373398 MLO 2014 08 19 20 05 00 1466-99 S co CCGG 72.890 -999.990 S.. V4 2014 09 08 14 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 373399 MLO 2014 08 19 20 40 00 1367-99 P co CCGG 72.820 -999.990 ... V4 2014 09 08 14 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 373396 MLO 2014 08 19 20 40 00 1368-99 P co CCGG 73.600 -999.990 ... V4 2014 09 08 14 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 373397 MLO 2014 08 26 20 08 00 1594-99 S co CCGG 72.380 -999.990 S.. V4 2014 09 05 16 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 373412 MLO 2014 08 26 20 08 00 3544-99 S co CCGG 73.030 -999.990 S.. V4 2014 09 05 16 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 373413 MLO 2014 08 26 20 33 00 1788-99 P co CCGG 74.560 -999.990 ... V4 2014 09 05 15 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 373410 MLO 2014 08 26 20 33 00 2855-99 P co CCGG 74.700 -999.990 ... V4 2014 09 05 15 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 373411 MLO 2014 09 02 19 45 00 4505-99 P co CCGG 74.330 -999.990 ... V4 2014 09 15 15 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 373791 MLO 2014 09 02 19 45 00 4506-99 P co CCGG 74.230 -999.990 ... V4 2014 09 15 15 18 00 19.5362 -155.5763 3402.00 3397.00 5.00 373792 MLO 2014 09 02 20 00 00 5367-99 S co CCGG 72.500 -999.990 S.. V4 2014 09 15 15 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 373793 MLO 2014 09 02 20 00 00 5368-99 S co CCGG 71.380 -999.990 S.. V4 2014 09 15 15 50 00 19.5362 -155.5763 3437.00 3397.00 40.00 373794 MLO 2014 09 09 20 02 00 5213-99 S co CCGG 67.240 -999.990 S.. V4 2014 09 22 14 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 374268 MLO 2014 09 09 20 02 00 5214-99 S co CCGG 66.930 -999.990 S.. V4 2014 09 22 14 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 374269 MLO 2014 09 09 20 28 00 313-99 P co CCGG 69.300 -999.990 ... V4 2014 09 22 15 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 374266 MLO 2014 09 09 20 28 00 314-99 P co CCGG 68.790 -999.990 ... V4 2014 09 22 15 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 374267 MLO 2014 09 16 19 31 00 2283-99 P co CCGG 77.860 -999.990 ... V4 2014 09 23 13 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 374382 MLO 2014 09 16 19 31 00 579-99 P co CCGG 78.640 -999.990 ... V4 2014 09 23 13 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 374381 MLO 2014 09 16 20 03 00 1251-99 S co CCGG 78.430 -999.990 S.. V4 2014 09 23 14 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 374383 MLO 2014 09 16 20 03 00 3730-99 S co CCGG 77.750 -999.990 S.. V4 2014 09 23 14 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 374384 MLO 2014 09 23 20 04 00 1874-99 S co CCGG 93.240 -999.990 S.. V4 2014 10 01 12 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 374773 MLO 2014 09 23 20 04 00 6465-66 S co CCGG 92.420 -999.990 S.. V4 2014 10 01 13 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 374772 MLO 2014 09 23 20 29 00 4129-99 P co CCGG 87.340 -999.990 ... V4 2014 10 01 13 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 374771 MLO 2014 09 23 20 29 00 5422-99 P co CCGG 87.540 -999.990 ... V4 2014 10 01 13 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 374770 MLO 2014 09 30 20 08 00 3837-99 S co CCGG 77.100 -999.990 S.. V4 2014 10 10 11 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 375204 MLO 2014 09 30 20 08 00 3838-99 S co CCGG 78.040 -999.990 S.. V4 2014 10 10 12 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 375205 MLO 2014 09 30 20 32 00 119-99 P co CCGG 76.690 -999.990 ... V4 2014 10 10 12 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 375202 MLO 2014 09 30 20 32 00 120-99 P co CCGG 76.780 -999.990 ... V4 2014 10 10 12 40 00 19.5362 -155.5763 3402.00 3397.00 5.00 375203 MLO 2014 10 07 20 05 00 256-99 S co CCGG 66.850 -999.990 S.. V4 2014 10 15 13 32 00 19.5362 -155.5763 3437.00 3397.00 40.00 375557 MLO 2014 10 07 20 05 00 3063-99 S co CCGG 67.540 -999.990 S.. V4 2014 10 15 13 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 375558 MLO 2014 10 07 20 28 00 118-99 P co CCGG 69.180 -999.990 ... V4 2014 10 15 13 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 375559 MLO 2014 10 07 20 28 00 1920-99 P co CCGG 68.620 -999.990 ... V4 2014 10 15 13 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 375560 MLO 2014 10 14 19 49 00 3591-99 P co CCGG 76.510 -999.990 ... V4 2014 10 21 12 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 375896 MLO 2014 10 14 19 49 00 3592-99 P co CCGG 76.600 -999.990 ... V4 2014 10 21 12 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 375897 MLO 2014 10 14 20 11 00 811-99 S co CCGG 70.590 -999.990 S.. V4 2014 10 21 13 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 375898 MLO 2014 10 14 20 11 00 812-99 S co CCGG 69.910 -999.990 S.. V4 2014 10 21 13 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 375899 MLO 2014 10 21 20 09 00 1241-99 S co CCGG 64.080 -999.990 S.. V4 2014 11 05 12 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 376548 MLO 2014 10 21 20 09 00 4307-99 S co CCGG 63.580 -999.990 S.. V4 2014 11 05 12 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 376549 MLO 2014 10 21 20 42 00 1702-99 P co CCGG 65.450 -999.990 ... V4 2014 11 05 12 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 376550 MLO 2014 10 21 20 42 00 5191-99 P co CCGG 64.280 -999.990 ... V4 2014 11 05 13 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 376551 MLO 2014 10 28 19 32 00 75-99 P co CCGG 162.770 -999.990 .X. V4 2014 11 17 17 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 376942 MLO 2014 10 28 19 32 00 763-99 P co CCGG 163.980 -999.990 .X. V4 2014 11 17 17 18 00 19.5362 -155.5763 3402.00 3397.00 5.00 376943 MLO 2014 10 28 20 05 00 4299-99 S co CCGG 160.320 -999.990 S.. V4 2014 11 18 10 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 376940 MLO 2014 10 28 20 05 00 4489-99 S co CCGG 158.940 -999.990 S.. V4 2014 11 18 09 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 376941 MLO 2014 11 04 19 06 00 5033-99 S co CCGG 74.600 -999.990 S.. V4 2014 11 24 14 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 377265 MLO 2014 11 04 19 06 00 5034-99 S co CCGG 74.200 -999.990 S.. V4 2014 11 24 14 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 377266 MLO 2014 11 04 19 36 00 3293-99 P co CCGG 78.150 -999.990 ... V4 2014 11 24 14 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 377267 MLO 2014 11 04 19 36 00 3294-99 P co CCGG 77.940 -999.990 ... V4 2014 11 24 15 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 377268 MLO 2014 11 12 19 33 00 6717-66 P co CCGG 91.060 -999.990 ... V4 2014 12 04 15 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 377857 MLO 2014 11 12 19 33 00 6718-66 P co CCGG 91.170 -999.990 ... V4 2014 12 04 15 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 377858 MLO 2014 11 12 20 07 00 2169-99 S co CCGG 93.360 -999.990 S.. V4 2014 12 04 15 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 377855 MLO 2014 11 12 20 07 00 2170-99 S co CCGG 91.600 -999.990 S.. V4 2014 12 04 15 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 377856 MLO 2014 11 18 19 20 00 1207-99 S co CCGG 106.930 -999.990 S.. V4 2014 12 11 12 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 378255 MLO 2014 11 18 19 20 00 2339-99 S co CCGG 106.480 -999.990 S.. V4 2014 12 11 12 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 378256 MLO 2014 11 18 20 27 00 2784-99 P co CCGG 100.740 -999.990 ... V4 2014 12 11 13 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 378254 MLO 2014 11 18 20 27 00 649-99 P co CCGG 101.810 -999.990 ... V4 2014 12 11 13 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 378253 MLO 2014 11 25 20 06 00 2145-99 S co CCGG 85.200 -999.990 S.. V4 2014 12 16 12 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 378364 MLO 2014 11 25 20 06 00 2146-99 S co CCGG 85.110 -999.990 S.. V4 2014 12 16 12 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 378365 MLO 2014 11 25 20 42 00 2775-99 P co CCGG 79.300 -999.990 ... V4 2014 12 16 11 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 378366 MLO 2014 11 25 20 42 00 2776-99 P co CCGG 80.200 -999.990 ... V4 2014 12 16 12 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 378367 MLO 2014 12 02 19 45 00 1887-99 P co CCGG 109.760 -999.990 ... V4 2014 12 22 13 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 378831 MLO 2014 12 02 19 45 00 4493-99 P co CCGG 110.740 -999.990 ... V4 2014 12 22 13 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 378832 MLO 2014 12 02 20 11 00 4835-99 S co CCGG 107.640 -999.990 S.. V4 2014 12 23 11 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 378889 MLO 2014 12 02 20 11 00 6342-66 S co CCGG 108.220 -999.990 S.. V4 2014 12 23 11 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 378890 MLO 2014 12 09 19 44 00 3500-99 P co CCGG 92.500 -999.990 ... V4 2015 01 05 13 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 379324 MLO 2014 12 09 19 44 00 6055-66 P co CCGG 92.960 -999.990 ... V4 2015 01 05 13 18 00 19.5362 -155.5763 3402.00 3397.00 5.00 379325 MLO 2014 12 09 20 09 00 2147-99 S co CCGG 97.290 -999.990 +.. V4 2015 01 05 14 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 379322 MLO 2014 12 09 20 09 00 3681-99 S co CCGG 94.590 -999.990 -.. V4 2015 01 05 14 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 379323 MLO 2014 12 14 20 09 00 3322-99 S co CCGG 85.500 -999.990 S.. V4 2015 01 08 12 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 379499 MLO 2014 12 14 20 09 00 427-99 S co CCGG 85.460 -999.990 S.. V4 2015 01 08 12 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 379498 MLO 2014 12 14 20 57 00 3514-99 P co CCGG 84.500 -999.990 ... V4 2015 01 08 11 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 379500 MLO 2014 12 14 20 57 00 4784-99 P co CCGG 84.690 -999.990 ... V4 2015 01 08 12 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 379501 MLO 2014 12 23 20 04 00 1175-99 S co CCGG 99.850 -999.990 S.. V4 2015 01 14 16 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 379845 MLO 2014 12 23 20 04 00 3604-99 S co CCGG 99.890 -999.990 S.. V4 2015 01 14 16 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 379846 MLO 2014 12 23 20 28 00 2816-99 P co CCGG 100.490 -999.990 N.. V4 2015 01 14 15 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 379843 MLO 2014 12 23 20 28 00 4131-99 P co CCGG 114.940 -999.990 N.. V4 2015 01 14 15 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 379844 MLO 2014 12 31 20 10 00 3955-99 S co CCGG 109.570 -999.990 S.. V4 2015 01 27 16 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 380247 MLO 2014 12 31 20 10 00 3956-99 S co CCGG 111.010 -999.990 S.. V4 2015 01 27 16 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 380248 MLO 2014 12 31 20 32 00 6157-66 P co CCGG 110.000 -999.990 ... V4 2015 01 27 15 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 380249 MLO 2014 12 31 20 32 00 6158-66 P co CCGG 110.440 -999.990 ... V4 2015 01 27 15 28 00 19.5362 -155.5763 3402.00 3397.00 5.00 380250 MLO 2015 01 06 19 04 00 4089-99 S co CCGG 92.420 -999.990 S.. V4 2015 02 05 15 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 380625 MLO 2015 01 06 19 04 00 4090-99 S co CCGG 92.500 -999.990 S.. V4 2015 02 05 15 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 380624 MLO 2015 01 06 19 39 00 4479-99 P co CCGG 92.570 -999.990 ... V4 2015 02 05 14 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 380622 MLO 2015 01 06 19 39 00 4480-99 P co CCGG 93.200 -999.990 ... V4 2015 02 05 15 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 380623 MLO 2015 01 13 19 41 00 2966-99 P co CCGG 134.360 -999.990 .X. V4 2015 02 06 16 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 380830 MLO 2015 01 13 19 41 00 3482-99 P co CCGG 134.020 -999.990 .X. V4 2015 02 06 16 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 380831 MLO 2015 01 13 20 05 00 1577-99 S co CCGG 131.520 -999.990 S.. V4 2015 02 06 16 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 380828 MLO 2015 01 13 20 05 00 4334-99 S co CCGG 130.690 -999.990 S.. V4 2015 02 06 16 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 380829 MLO 2015 01 20 19 42 00 3023-99 P co CCGG 80.980 -999.990 ... V4 2015 02 12 16 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 381207 MLO 2015 01 20 19 42 00 785-99 P co CCGG 81.700 -999.990 ... V4 2015 02 12 16 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 381208 MLO 2015 01 20 20 08 00 4219-99 S co CCGG 80.760 -999.990 S.. V4 2015 02 12 17 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 381205 MLO 2015 01 20 20 08 00 458-99 S co CCGG 80.450 -999.990 S.. V4 2015 02 12 17 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 381206 MLO 2015 01 27 19 39 00 2215-99 P co CCGG 92.570 -999.990 ... V4 2015 02 27 12 56 00 19.5362 -155.5763 3402.00 3397.00 5.00 381558 MLO 2015 01 27 19 39 00 2216-99 P co CCGG 91.640 -999.990 ... V4 2015 02 27 13 12 00 19.5362 -155.5763 3402.00 3397.00 5.00 381559 MLO 2015 01 27 20 13 00 475-99 S co CCGG 91.420 -999.990 S.. V4 2015 02 27 13 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 381560 MLO 2015 01 27 20 13 00 476-99 S co CCGG 91.510 -999.990 S.. V4 2015 02 27 13 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 381561 MLO 2015 02 03 19 36 00 5015-99 P co CCGG 92.000 -999.990 ... V4 2015 03 03 15 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 381917 MLO 2015 02 03 19 36 00 5016-99 P co CCGG 91.660 -999.990 ... V4 2015 03 03 15 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 381918 MLO 2015 02 03 20 04 00 811-99 S co CCGG 91.560 -999.990 S.. V4 2015 03 03 16 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 381915 MLO 2015 02 03 20 04 00 812-99 S co CCGG 90.950 -999.990 S.. V4 2015 03 03 16 29 00 19.5362 -155.5763 3437.00 3397.00 40.00 381916 MLO 2015 02 10 19 17 00 235-99 S co CCGG 78.680 -999.990 S.. V4 2015 03 17 12 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 382492 MLO 2015 02 10 19 17 00 3666-99 S co CCGG 78.110 -999.990 S.. V4 2015 03 17 13 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 382493 MLO 2015 02 10 19 53 00 153-99 P co CCGG 76.030 -999.990 ... V4 2015 03 16 15 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 382486 MLO 2015 02 10 19 53 00 4598-99 P co CCGG 75.650 -999.990 ... V4 2015 03 16 14 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 382487 MLO 2015 02 17 19 45 00 4268-99 P co CCGG 76.170 -999.990 ... V4 2015 03 19 08 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 382620 MLO 2015 02 17 19 45 00 952-99 P co CCGG 76.030 -999.990 ... V4 2015 03 19 08 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 382619 MLO 2015 02 17 20 08 00 4104-99 S co CCGG 75.750 -999.990 S.. V4 2015 03 18 15 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 382617 MLO 2015 02 17 20 08 00 671-99 S co CCGG 76.630 -999.990 S.. V4 2015 03 18 15 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 382618 MLO 2015 02 24 20 05 00 3135-99 S co CCGG 149.870 -999.990 N.. V4 2015 03 26 15 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 383039 MLO 2015 02 24 20 05 00 3136-99 S co CCGG 153.930 -999.990 N.. V4 2015 03 26 16 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 383040 MLO 2015 02 24 20 42 00 5009-99 P co CCGG 134.340 -999.990 N.. V4 2015 03 26 15 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 383037 MLO 2015 02 24 20 42 00 5010-99 P co CCGG 129.450 -999.990 N.. V4 2015 03 26 15 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 383038 MLO 2015 03 03 20 13 00 3370-99 S co CCGG 108.730 -999.990 S.. V4 2015 03 30 16 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 383858 MLO 2015 03 03 20 13 00 432-99 S co CCGG 109.250 -999.990 S.. V4 2015 03 30 16 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 383859 MLO 2015 03 03 20 34 00 1280-99 P co CCGG 110.310 -999.990 ... V4 2015 03 30 17 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 383856 MLO 2015 03 03 20 34 00 405-99 P co CCGG 108.300 -999.990 ... V4 2015 03 30 17 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 383857 MLO 2015 03 10 20 06 00 3773-99 S co CCGG 175.550 -999.990 S.. V4 2015 04 01 16 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 383830 MLO 2015 03 10 20 06 00 3774-99 S co CCGG 176.780 -999.990 S.. V4 2015 04 01 17 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 383831 MLO 2015 03 10 20 33 00 3273-99 P co CCGG 177.480 -999.990 .X. V4 2015 04 01 16 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 383828 MLO 2015 03 10 20 33 00 3274-99 P co CCGG 178.200 -999.990 .X. V4 2015 04 01 16 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 383829 MLO 2015 03 17 20 06 00 4530-99 S co CCGG 94.560 -999.990 S.. V4 2015 04 13 16 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 384333 MLO 2015 03 17 20 06 00 5396-99 S co CCGG 94.820 -999.990 S.. V4 2015 04 13 16 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 384332 MLO 2015 03 17 20 32 00 362-99 P co CCGG 105.220 -999.990 ... V4 2015 04 13 16 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 384334 MLO 2015 03 17 20 32 00 829-99 P co CCGG 104.100 -999.990 ... V4 2015 04 13 16 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 384335 MLO 2015 03 24 20 12 00 5109-99 S co CCGG 91.470 -999.990 S.. V4 2015 04 15 14 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 384483 MLO 2015 03 24 20 12 00 5110-99 S co CCGG 91.190 -999.990 S.. V4 2015 04 15 14 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 384484 MLO 2015 03 24 20 45 00 5117-99 P co CCGG 95.940 -999.990 ... V4 2015 04 15 12 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 384481 MLO 2015 03 24 20 45 00 5118-99 P co CCGG 95.590 -999.990 ... V4 2015 04 15 13 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 384482 MLO 2015 03 31 20 06 00 1031-99 S co CCGG 120.820 -999.990 S.. V4 2015 04 23 17 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 384853 MLO 2015 03 31 20 06 00 1754-99 S co CCGG 120.620 -999.990 S.. V4 2015 04 23 16 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 384852 MLO 2015 03 31 20 30 00 1786-99 P co CCGG 119.440 -999.990 ... V4 2015 04 24 11 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 384851 MLO 2015 03 31 20 30 00 4742-99 P co CCGG 119.290 -999.990 ... V4 2015 04 24 10 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 384850 MLO 2015 04 07 19 43 00 1203-99 P co CCGG 121.440 -999.990 ... V4 2015 04 30 14 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 385255 MLO 2015 04 07 19 43 00 1204-99 P co CCGG 122.540 -999.990 ... V4 2015 04 30 15 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 385256 MLO 2015 04 07 20 07 00 4845-99 S co CCGG 123.480 -999.990 S.. V4 2015 04 30 15 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 385257 MLO 2015 04 07 20 07 00 4846-99 S co CCGG 122.930 -999.990 S.. V4 2015 04 30 15 32 00 19.5362 -155.5763 3437.00 3397.00 40.00 385258 MLO 2015 04 14 20 05 00 1193-99 S co CCGG 137.590 -999.990 S.. V4 2015 05 04 16 29 00 19.5362 -155.5763 3437.00 3397.00 40.00 385792 MLO 2015 04 14 20 05 00 1194-99 S co CCGG 137.800 -999.990 S.. V4 2015 05 04 16 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 385793 MLO 2015 04 14 20 58 00 2595-99 P co CCGG 136.940 -999.990 ... V4 2015 05 05 11 15 00 19.5362 -155.5763 3402.00 3397.00 5.00 385790 MLO 2015 04 14 20 58 00 2596-99 P co CCGG 137.870 -999.990 ... V4 2015 05 05 11 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 385791 MLO 2015 04 21 19 20 00 3410-99 S co CCGG 105.310 -999.990 S.. V4 2015 05 12 15 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 386181 MLO 2015 04 21 19 20 00 5280-99 S co CCGG 106.280 -999.990 S.. V4 2015 05 12 15 32 00 19.5362 -155.5763 3437.00 3397.00 40.00 386182 MLO 2015 04 21 19 47 00 2495-99 P co CCGG 106.220 -999.990 ... V4 2015 05 12 16 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 386180 MLO 2015 04 21 19 47 00 4111-99 P co CCGG 107.420 -999.990 ... V4 2015 05 12 15 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 386179 MLO 2015 04 28 19 44 00 2915-99 P co CCGG 110.340 -999.990 ... V4 2015 05 26 10 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 386533 MLO 2015 04 28 19 44 00 4511-99 P co CCGG 109.140 -999.990 ... V4 2015 05 26 11 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 386534 MLO 2015 04 28 20 10 00 2-99 S co CCGG 109.870 -999.990 S.. V4 2015 05 26 11 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 386535 MLO 2015 04 28 20 10 00 6138-66 S co CCGG 110.550 -999.990 S.. V4 2015 05 26 11 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 386536 MLO 2015 05 05 19 38 00 3649-99 P co CCGG 116.260 -999.990 ... V4 2015 06 25 16 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 387998 MLO 2015 05 05 19 38 00 3650-99 P co CCGG 116.950 -999.990 ... V4 2015 06 25 17 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 387997 MLO 2015 05 05 21 18 00 4925-99 S co CCGG 116.600 -999.990 S.. V4 2015 06 26 12 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 387993 MLO 2015 05 05 21 18 00 4926-99 S co CCGG 117.550 -999.990 S.. V4 2015 06 26 12 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 387994 MLO 2015 05 12 19 46 00 4904-99 P co CCGG 107.230 -999.990 ... V4 2015 06 11 15 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 387430 MLO 2015 05 12 19 46 00 510-99 P co CCGG 104.670 -999.990 ... V4 2015 06 11 14 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 387431 MLO 2015 05 12 20 13 00 3298-99 S co CCGG 102.410 -999.990 N.. V4 2015 06 11 15 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 387429 MLO 2015 05 12 20 13 00 478-99 S co CCGG 107.270 -999.990 N.. V4 2015 06 11 15 29 00 19.5362 -155.5763 3437.00 3397.00 40.00 387428 MLO 2015 05 19 19 32 00 3852-99 P co CCGG 108.200 -999.990 ... V4 2015 06 17 14 15 00 19.5362 -155.5763 3402.00 3397.00 5.00 387807 MLO 2015 05 19 19 32 00 4439-99 P co CCGG 108.400 -999.990 ... V4 2015 06 17 13 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 387808 MLO 2015 05 19 20 04 00 4555-99 S co CCGG 107.820 -999.990 S.. V4 2015 06 17 13 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 387806 MLO 2015 05 19 20 04 00 5305-99 S co CCGG 107.110 -999.990 S.. V4 2015 06 17 13 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 387805 MLO 2015 05 26 20 05 00 721-99 P co CCGG 90.000 -999.990 ... V4 2015 06 25 16 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 387991 MLO 2015 05 26 20 05 00 722-99 P co CCGG 89.930 -999.990 ... V4 2015 06 25 16 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 387992 MLO 2015 05 26 20 29 00 4327-99 P co CCGG 90.700 -999.990 ... V4 2015 06 19 15 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 387995 MLO 2015 05 26 20 29 00 4328-99 P co CCGG 90.570 -999.990 ... V4 2015 06 19 16 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 387996 MLO 2015 06 02 19 34 00 1354-99 P co CCGG 86.650 -999.990 ... V4 2015 07 08 11 22 00 19.5362 -155.5763 3402.00 3397.00 5.00 388460 MLO 2015 06 02 19 34 00 5196-99 P co CCGG 85.680 -999.990 ... V4 2015 07 08 11 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 388459 MLO 2015 06 02 20 19 00 6494-66 S co CCGG 83.430 -999.990 S.. V4 2015 07 09 13 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 388862 MLO 2015 06 02 20 19 00 909-99 S co CCGG 83.560 -999.990 S.. V4 2015 07 09 13 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 388863 MLO 2015 06 09 19 43 00 2355-99 P co CCGG 98.960 -999.990 ... V4 2015 07 14 14 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 389073 MLO 2015 06 09 19 43 00 2356-99 P co CCGG 98.700 -999.990 ... V4 2015 07 14 15 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 389074 MLO 2015 06 09 20 10 00 2197-99 S co CCGG 96.610 -999.990 S.. V4 2015 07 14 14 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 389075 MLO 2015 06 09 20 10 00 2198-99 S co CCGG 95.630 -999.990 S.. V4 2015 07 14 14 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 389076 MLO 2015 06 16 20 07 00 3279-99 S co CCGG 76.770 -999.990 S.. V4 2015 07 15 16 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 389415 MLO 2015 06 16 20 07 00 3280-99 S co CCGG 76.560 -999.990 S.. V4 2015 07 15 17 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 389416 MLO 2015 06 16 20 37 00 4855-99 P co CCGG 75.230 -999.990 ... V4 2015 07 15 16 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 389417 MLO 2015 06 16 20 37 00 4856-99 P co CCGG 75.070 -999.990 ... V4 2015 07 15 16 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 389418 MLO 2015 06 23 19 32 00 1725-99 P co CCGG 71.510 -999.990 ... V4 2015 07 29 15 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 389840 MLO 2015 06 23 19 32 00 1758-99 P co CCGG 72.220 -999.990 ... V4 2015 07 29 14 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 389841 MLO 2015 06 23 20 04 00 4589-99 S co CCGG 71.920 -999.990 S.. V4 2015 07 29 14 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 389839 MLO 2015 06 23 20 04 00 993-99 S co CCGG 71.870 -999.990 S.. V4 2015 07 29 13 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 389838 MLO 2015 06 30 19 36 00 4523-99 P co CCGG 76.270 -999.990 ... V4 2015 07 28 12 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 390174 MLO 2015 06 30 19 36 00 4524-99 P co CCGG 75.390 -999.990 ... V4 2015 07 28 13 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 390175 MLO 2015 06 30 20 06 00 1193-99 S co CCGG 71.830 -999.990 S.. V4 2015 07 28 12 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 390176 MLO 2015 06 30 20 06 00 1194-99 S co CCGG 71.880 -999.990 S.. V4 2015 07 28 12 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 390177 MLO 2015 07 07 20 40 00 1797-99 P co CCGG 76.250 -999.990 ... V4 2015 08 05 11 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 390500 MLO 2015 07 07 20 40 00 1798-99 P co CCGG 77.730 -999.990 ... V4 2015 08 05 11 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 390501 MLO 2015 07 07 21 12 00 27-99 S co CCGG 72.240 -999.990 S.. V4 2015 08 05 12 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 390502 MLO 2015 07 07 21 12 00 28-99 S co CCGG 71.480 -999.990 S.. V4 2015 08 05 12 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 390503 MLO 2015 07 14 20 05 00 141-99 S co CCGG 65.120 -999.990 S.. V4 2015 08 12 14 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 391053 MLO 2015 07 14 20 05 00 142-99 S co CCGG 66.040 -999.990 S.. V4 2015 08 12 15 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 391054 MLO 2015 07 14 20 28 00 5301-99 P co CCGG 67.490 -999.990 ... V4 2015 08 12 14 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 391055 MLO 2015 07 14 20 28 00 5302-99 P co CCGG 66.800 -999.990 ... V4 2015 08 12 14 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 391056 MLO 2015 07 21 20 07 00 1647-99 S co CCGG 78.260 -999.990 S.. V4 2015 08 14 12 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 391476 MLO 2015 07 21 20 07 00 4361-99 S co CCGG 78.220 -999.990 S.. V4 2015 08 14 12 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 391477 MLO 2015 07 21 20 38 00 2407-99 P co CCGG 78.610 -999.990 ... V4 2015 08 14 13 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 391474 MLO 2015 07 21 20 38 00 4936-99 P co CCGG 79.090 -999.990 ... V4 2015 08 14 13 18 00 19.5362 -155.5763 3402.00 3397.00 5.00 391475 MLO 2015 07 28 20 11 00 1635-99 S co CCGG 66.490 -999.990 S.. V4 2015 08 20 15 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 391975 MLO 2015 07 28 20 11 00 1766-99 S co CCGG 64.660 -999.990 S.. V4 2015 08 20 15 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 391976 MLO 2015 07 28 20 42 00 2287-99 P co CCGG 67.810 -999.990 ... V4 2015 08 20 14 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 391988 MLO 2015 07 28 20 42 00 6606-66 P co CCGG 67.790 -999.990 ... V4 2015 08 20 14 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 391989 MLO 2015 08 04 19 47 00 571-99 P co CCGG 78.340 -999.990 ... V4 2015 08 28 13 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 392143 MLO 2015 08 04 19 47 00 967-99 P co CCGG 76.720 -999.990 ... V4 2015 08 28 13 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 392142 MLO 2015 08 04 20 12 00 2999-99 S co CCGG 75.330 -999.990 S.. V4 2015 08 28 13 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 392144 MLO 2015 08 04 20 12 00 3753-99 S co CCGG 75.750 -999.990 S.. V4 2015 08 28 12 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 392145 MLO 2015 08 13 20 14 00 4175-99 S co CCGG 64.740 -999.990 S.. V4 2015 09 03 14 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 392853 MLO 2015 08 13 20 14 00 4176-99 S co CCGG 64.460 -999.990 S.. V4 2015 09 03 15 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 392854 MLO 2015 08 13 20 45 00 5007-99 P co CCGG 69.080 -999.990 ... V4 2015 09 03 15 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 392851 MLO 2015 08 13 20 45 00 5008-99 P co CCGG 69.250 -999.990 ... V4 2015 09 03 16 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 392852 MLO 2015 08 18 20 17 00 727-99 S co CCGG 63.530 -999.990 S.. V4 2015 09 11 13 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 393212 MLO 2015 08 18 20 17 00 728-99 S co CCGG 63.140 -999.990 S.. V4 2015 09 11 13 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 393211 MLO 2015 08 18 20 56 00 1063-99 P co CCGG 66.010 -999.990 ... V4 2015 09 11 13 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 393209 MLO 2015 08 18 20 56 00 1064-99 P co CCGG 65.540 -999.990 ... V4 2015 09 11 13 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 393210 MLO 2015 08 25 20 09 00 2721-99 S co CCGG 57.730 -999.990 S.. V4 2015 09 16 11 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 393496 MLO 2015 08 25 20 09 00 3667-99 S co CCGG 57.980 -999.990 S.. V4 2015 09 16 11 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 393497 MLO 2015 08 25 20 52 00 2624-99 P co CCGG 58.840 -999.990 ... V4 2015 09 16 12 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 393495 MLO 2015 08 25 20 52 00 2743-99 P co CCGG 59.560 -999.990 ... V4 2015 09 16 11 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 393494 MLO 2015 09 02 19 05 00 1871-99 S co CCGG 65.160 -999.990 S.. V4 2015 09 17 14 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 393975 MLO 2015 09 02 19 05 00 1872-99 S co CCGG 62.640 -999.990 S.. V4 2015 09 17 14 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 393976 MLO 2015 09 02 19 34 00 3737-99 P co CCGG 62.950 -999.990 ... V4 2015 09 17 14 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 393973 MLO 2015 09 02 19 34 00 3738-99 P co CCGG 63.050 -999.990 ... V4 2015 09 17 14 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 393974 MLO 2015 09 08 18 44 00 2130-99 P co CCGG 78.710 -999.990 ... V4 2015 09 25 15 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 394261 MLO 2015 09 08 18 44 00 2821-99 P co CCGG 79.100 -999.990 ... V4 2015 09 25 16 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 394262 MLO 2015 09 08 19 11 00 5322-99 S co CCGG 72.620 -999.990 S.. V4 2015 09 25 16 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 394263 MLO 2015 09 08 19 11 00 914-99 S co CCGG 73.320 -999.990 S.. V4 2015 09 25 16 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 394264 MLO 2015 09 15 20 11 00 2597-99 S co CCGG 68.220 -999.990 S.. V4 2015 09 30 12 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 394676 MLO 2015 09 15 20 11 00 2598-99 S co CCGG 67.550 -999.990 S.. V4 2015 09 30 13 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 394677 MLO 2015 09 15 20 46 00 421-99 P co CCGG 72.400 -999.990 ... V4 2015 09 30 13 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 394674 MLO 2015 09 15 20 46 00 422-99 P co CCGG 72.540 -999.990 ... V4 2015 09 30 13 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 394675 MLO 2015 09 22 19 49 00 2015-99 P co CCGG 72.260 -999.990 ... V4 2015 10 08 10 56 00 19.5362 -155.5763 3402.00 3397.00 5.00 394999 MLO 2015 09 22 19 49 00 2016-99 P co CCGG 72.220 -999.990 ... V4 2015 10 08 11 12 00 19.5362 -155.5763 3402.00 3397.00 5.00 395000 MLO 2015 09 22 20 09 00 2169-99 S co CCGG 73.430 -999.990 -.. V4 2015 10 08 10 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 395001 MLO 2015 09 22 20 09 00 2170-99 S co CCGG 76.820 -999.990 +.. V4 2015 10 08 10 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 395002 MLO 2015 09 29 20 07 00 2631-99 S co CCGG 85.620 -999.990 S.. V4 2015 10 20 16 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 395619 MLO 2015 09 29 20 07 00 4914-99 S co CCGG 84.870 -999.990 S.. V4 2015 10 20 17 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 395620 MLO 2015 09 29 20 33 00 3127-99 P co CCGG 82.090 -999.990 ... V4 2015 10 20 16 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 395622 MLO 2015 09 29 20 33 00 3445-99 P co CCGG 83.460 -999.990 ... V4 2015 10 20 16 40 00 19.5362 -155.5763 3402.00 3397.00 5.00 395621 MLO 2015 10 06 20 05 00 3663-99 S co CCGG 88.550 -999.990 S.. V4 2015 10 23 14 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 396285 MLO 2015 10 06 20 05 00 3664-99 S co CCGG 88.590 -999.990 S.. V4 2015 10 23 15 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 396286 MLO 2015 10 06 20 27 00 5369-99 P co CCGG 85.630 -999.990 ... V4 2015 10 23 15 28 00 19.5362 -155.5763 3402.00 3397.00 5.00 396287 MLO 2015 10 06 20 27 00 5370-99 P co CCGG 87.140 -999.990 ... V4 2015 10 23 15 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 396288 MLO 2015 10 13 20 10 00 2093-99 S co CCGG 68.110 -999.990 S.. V4 2015 10 28 13 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 396441 MLO 2015 10 13 20 10 00 2094-99 S co CCGG 67.630 -999.990 S.. V4 2015 10 28 14 09 00 19.5362 -155.5763 3437.00 3397.00 40.00 396442 MLO 2015 10 13 20 32 00 4985-99 P co CCGG 67.930 -999.990 ... V4 2015 10 28 14 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 396443 MLO 2015 10 13 20 32 00 4986-99 P co CCGG 69.180 -999.990 ... V4 2015 10 28 14 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 396444 MLO 2015 10 20 20 09 00 4689-99 S co CCGG 93.690 -999.990 S.. V4 2015 11 02 14 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 396747 MLO 2015 10 20 20 09 00 606-99 S co CCGG 94.380 -999.990 S.. V4 2015 11 02 14 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 396748 MLO 2015 10 20 20 37 00 409-99 P co CCGG 92.350 -999.990 ... V4 2015 11 02 14 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 396745 MLO 2015 10 20 20 37 00 4762-99 P co CCGG 91.670 -999.990 ... V4 2015 11 02 13 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 396746 MLO 2015 10 27 19 43 00 1405-99 P co CCGG 107.870 -999.990 ... V4 2015 11 10 10 15 00 19.5362 -155.5763 3402.00 3397.00 5.00 397230 MLO 2015 10 27 19 43 00 1406-99 P co CCGG 105.980 -999.990 ... V4 2015 11 10 10 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 397231 MLO 2015 10 27 20 08 00 4855-99 S co CCGG 104.440 -999.990 S.. V4 2015 11 10 11 50 00 19.5362 -155.5763 3437.00 3397.00 40.00 397232 MLO 2015 10 27 20 08 00 4856-99 S co CCGG 105.090 -999.990 S.. V4 2015 11 10 12 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 397233 MLO 2015 11 03 20 08 00 935-99 S co CCGG 92.640 -999.990 S.. V4 2015 11 16 11 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 397574 MLO 2015 11 03 20 08 00 936-99 S co CCGG 94.360 -999.990 S.. V4 2015 11 16 11 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 397575 MLO 2015 11 03 20 47 00 5121-99 P co CCGG 91.100 -999.990 ... V4 2015 11 16 11 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 397572 MLO 2015 11 03 20 47 00 5122-99 P co CCGG 89.880 -999.990 ... V4 2015 11 16 12 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 397573 MLO 2015 11 10 20 03 00 1677-99 S co CCGG 99.400 -999.990 S.. V4 2015 11 24 10 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 398161 MLO 2015 11 10 20 03 00 1678-99 S co CCGG 98.810 -999.990 S.. V4 2015 11 24 11 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 398162 MLO 2015 11 10 20 30 00 2841-99 P co CCGG 100.820 -999.990 ... V4 2015 11 24 09 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 398151 MLO 2015 11 10 20 30 00 2842-99 P co CCGG 100.440 -999.990 ... V4 2015 11 24 10 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 398152 MLO 2015 11 17 20 05 00 3721-99 S co CCGG 100.830 -999.990 S.. V4 2015 11 30 15 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 398360 MLO 2015 11 17 20 05 00 468-99 S co CCGG 101.540 -999.990 S.. V4 2015 11 30 16 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 398361 MLO 2015 11 17 20 43 00 4929-99 P co CCGG 103.190 -999.990 ... V4 2015 11 30 15 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 398362 MLO 2015 11 17 20 43 00 6048-66 P co CCGG 101.870 -999.990 ... V4 2015 11 30 15 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 398363 MLO 2015 11 24 20 06 00 3818-99 S co CCGG 87.280 -999.990 S.. V4 2015 12 04 16 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 398558 MLO 2015 11 24 20 06 00 5281-99 S co CCGG 87.240 -999.990 S.. V4 2015 12 04 15 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 398557 MLO 2015 11 24 22 29 00 1346-99 P co CCGG 89.730 -999.990 ... V4 2015 12 04 16 40 00 19.5362 -155.5763 3402.00 3397.00 5.00 398559 MLO 2015 11 24 22 29 00 2632-99 P co CCGG 89.270 -999.990 ... V4 2015 12 04 16 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 398560 MLO 2015 12 01 20 03 00 1987-99 S co CCGG 95.160 -999.990 S.. V4 2015 12 18 14 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 398925 MLO 2015 12 01 20 03 00 1988-99 S co CCGG 94.560 -999.990 S.. V4 2015 12 18 15 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 398926 MLO 2015 12 01 20 31 00 1203-99 P co CCGG 95.530 -999.990 ... V4 2015 12 18 14 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 398923 MLO 2015 12 01 20 31 00 1204-99 P co CCGG 96.010 -999.990 ... V4 2015 12 18 14 40 00 19.5362 -155.5763 3402.00 3397.00 5.00 398924 MLO 2015 12 08 20 05 00 3993-99 S co CCGG 101.370 -999.990 S.. V4 2016 01 11 10 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 399858 MLO 2015 12 08 20 05 00 4266-99 S co CCGG 100.450 -999.990 S.. V4 2016 01 11 10 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 399859 MLO 2015 12 08 20 34 00 1801-99 P co CCGG 96.910 -999.990 N.. V4 2016 01 11 10 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 399861 MLO 2015 12 08 20 34 00 630-99 P co CCGG 97.750 -999.990 ... V4 2016 01 11 10 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 399860 MLO 2015 12 15 20 06 00 4117-99 S co CCGG 113.480 -999.990 S.. V4 2016 01 08 15 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 399868 MLO 2015 12 15 20 06 00 4118-99 S co CCGG 113.850 -999.990 S.. V4 2016 01 08 15 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 399869 MLO 2015 12 15 20 31 00 2787-99 P co CCGG 112.690 -999.990 ... V4 2016 01 08 14 22 00 19.5362 -155.5763 3402.00 3397.00 5.00 399866 MLO 2015 12 15 20 31 00 2788-99 P co CCGG 112.040 -999.990 ... V4 2016 01 08 14 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 399867 MLO 2015 12 22 19 18 00 250-99 S co CCGG 95.220 -999.990 S.. V4 2016 01 13 10 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 399956 MLO 2015 12 22 19 18 00 3619-99 S co CCGG 98.040 -999.990 S.. V4 2016 01 13 11 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 399957 MLO 2015 12 22 19 41 00 2516-99 P co CCGG 96.460 -999.990 ... V4 2016 01 13 09 12 00 19.5362 -155.5763 3402.00 3397.00 5.00 399954 MLO 2015 12 22 19 41 00 3213-99 P co CCGG 98.910 -999.990 ... V4 2016 01 13 09 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 399955 MLO 2015 12 29 19 15 00 2775-99 S co CCGG 84.460 -999.990 S.. V4 2016 01 14 15 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 400095 MLO 2015 12 29 19 15 00 2776-99 S co CCGG 83.850 -999.990 S.. V4 2016 01 14 15 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 400096 MLO 2015 12 29 19 46 00 207-99 P co CCGG 87.370 -999.990 ... V4 2016 01 14 15 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 400093 MLO 2015 12 29 19 46 00 208-99 P co CCGG 86.890 -999.990 ... V4 2016 01 14 16 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 400094 MLO 2016 01 05 20 06 00 5094-99 S co CCGG 103.370 -999.990 S.. V4 2016 01 27 11 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 400875 MLO 2016 01 05 20 06 00 939-99 S co CCGG 103.300 -999.990 S.. V4 2016 01 27 11 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 400874 MLO 2016 01 05 20 33 00 1299-99 P co CCGG 105.360 -999.990 ... V4 2016 01 27 14 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 400872 MLO 2016 01 05 20 33 00 2407-99 P co CCGG 104.620 -999.990 ... V4 2016 01 27 15 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 400873 MLO 2016 01 12 20 16 00 3273-99 S co CCGG 98.160 -999.990 S.. V4 2016 01 27 11 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 400910 MLO 2016 01 12 20 16 00 3274-99 S co CCGG 97.690 -999.990 S.. V4 2016 01 27 11 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 400911 MLO 2016 01 12 20 43 00 1661-99 P co CCGG 99.260 -999.990 ... V4 2016 01 27 09 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 400908 MLO 2016 01 12 20 43 00 1662-99 P co CCGG 137.750 -999.990 N.. V4 2016 01 27 09 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 400909 MLO 2016 01 19 19 25 00 367-99 P co CCGG 91.450 -999.990 ... V4 2016 02 02 12 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 401199 MLO 2016 01 19 19 25 00 368-99 P co CCGG 91.840 -999.990 ... V4 2016 02 02 12 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 401200 MLO 2016 01 19 20 01 00 5123-99 S co CCGG 94.890 -999.990 S.. V4 2016 02 02 12 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 401197 MLO 2016 01 19 20 01 00 5124-99 S co CCGG 93.650 -999.990 S.. V4 2016 02 02 13 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 401198 MLO 2016 01 26 20 12 00 5383-99 S co CCGG 120.970 -999.990 S.. V4 2016 02 12 10 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 401638 MLO 2016 01 26 20 12 00 5384-99 S co CCGG 121.590 -999.990 S.. V4 2016 02 12 10 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 401639 MLO 2016 01 26 20 49 00 3073-99 P co CCGG 122.470 -999.990 ... V4 2016 02 12 10 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 401636 MLO 2016 01 26 20 49 00 3074-99 P co CCGG 122.060 -999.990 ... V4 2016 02 12 11 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 401637 MLO 2016 02 02 20 05 00 5005-99 S co CCGG 98.470 -999.990 +.. V4 2016 02 18 09 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 402168 MLO 2016 02 02 20 05 00 849-99 S co CCGG 95.390 -999.990 -.. V4 2016 02 18 08 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 402167 MLO 2016 02 02 20 41 00 1044-99 P co CCGG 102.490 -999.990 ... V4 2016 02 18 11 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 402170 MLO 2016 02 02 20 41 00 4494-99 P co CCGG 103.920 -999.990 ... V4 2016 02 18 11 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 402169 MLO 2016 02 09 19 48 00 239-99 P co CCGG 122.810 -999.990 ... V4 2016 02 25 15 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 402470 MLO 2016 02 09 19 48 00 2560-99 P co CCGG 121.160 -999.990 ... V4 2016 02 25 15 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 402471 MLO 2016 02 09 20 11 00 1869-99 S co CCGG 122.610 -999.990 S.. V4 2016 02 25 15 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 402472 MLO 2016 02 09 20 11 00 2500-99 S co CCGG 121.460 -999.990 S.. V4 2016 02 25 14 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 402473 MLO 2016 02 16 20 08 00 2321-99 S co CCGG 93.730 -999.990 S.. V4 2016 03 03 15 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 402778 MLO 2016 02 16 20 08 00 2322-99 S co CCGG 94.860 -999.990 S.. V4 2016 03 03 15 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 402779 MLO 2016 02 16 20 51 00 1825-99 P co CCGG 93.680 -999.990 ... V4 2016 03 03 15 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 402776 MLO 2016 02 16 20 51 00 1826-99 P co CCGG 93.430 -999.990 ... V4 2016 03 03 16 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 402777 MLO 2016 02 23 20 12 00 241-99 S co CCGG 125.070 -999.990 S.. V4 2016 03 14 14 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 403501 MLO 2016 02 23 20 12 00 996-99 S co CCGG 123.690 -999.990 S.. V4 2016 03 14 15 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 403502 MLO 2016 02 23 20 49 00 1836-99 P co CCGG 125.470 -999.990 ... V4 2016 03 14 15 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 403503 MLO 2016 02 23 20 49 00 2326-99 P co CCGG 127.780 -999.990 ... V4 2016 03 14 15 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 403504 MLO 2016 03 01 19 27 00 759-99 P co CCGG 112.030 -999.990 ... V4 2016 03 14 12 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 403509 MLO 2016 03 01 19 27 00 760-99 P co CCGG 109.660 -999.990 ... V4 2016 03 14 12 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 403510 MLO 2016 03 01 20 00 00 3951-99 S co CCGG 111.600 -999.990 S.. V4 2016 03 14 13 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 403511 MLO 2016 03 01 20 00 00 3952-99 S co CCGG 110.960 -999.990 S.. V4 2016 03 14 13 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 403512 MLO 2016 03 08 20 04 00 1315-99 S co CCGG 81.630 -999.990 S.. V4 2016 03 17 12 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 403613 MLO 2016 03 08 20 04 00 4808-99 S co CCGG 81.930 -999.990 S.. V4 2016 03 17 12 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 403614 MLO 2016 03 08 20 25 00 3006-99 P co CCGG 84.940 -999.990 ... V4 2016 03 17 11 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 403612 MLO 2016 03 08 20 25 00 4150-99 P co CCGG 84.440 -999.990 ... V4 2016 03 17 11 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 403611 MLO 2016 03 15 20 01 00 28-99 S co CCGG 105.870 -999.990 S.. V4 2016 03 31 15 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 404274 MLO 2016 03 15 20 01 00 4491-99 S co CCGG 106.890 -999.990 S.. V4 2016 03 31 15 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 404275 MLO 2016 03 15 20 23 00 1612-99 P co CCGG 109.050 -999.990 ... V4 2016 03 31 15 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 404272 MLO 2016 03 15 20 23 00 3888-99 P co CCGG 108.480 -999.990 ... V4 2016 03 31 14 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 404273 MLO 2016 03 24 20 08 00 3218-99 S co CCGG 120.390 -999.990 S.. V4 2016 04 06 08 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 404502 MLO 2016 03 24 20 08 00 626-99 S co CCGG 121.810 -999.990 S.. V4 2016 04 06 08 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 404501 MLO 2016 03 24 20 50 00 4106-99 P co CCGG 120.860 -999.990 ... V4 2016 04 06 09 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 404499 MLO 2016 03 24 20 50 00 857-99 P co CCGG 119.930 -999.990 ... V4 2016 04 06 09 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 404500 MLO 2016 03 29 20 06 00 1403-99 S co CCGG 121.980 -999.990 S.. V4 2016 04 11 13 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 404846 MLO 2016 03 29 20 06 00 2725-99 S co CCGG 122.170 -999.990 S.. V4 2016 04 11 13 29 00 19.5362 -155.5763 3437.00 3397.00 40.00 404847 MLO 2016 03 29 20 23 00 2489-99 P co CCGG 124.410 -999.990 ... V4 2016 04 11 13 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 404845 MLO 2016 03 29 20 23 00 290-99 P co CCGG 124.410 -999.990 ... V4 2016 04 11 12 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 404844 MLO 2016 04 05 20 04 00 4693-99 S co CCGG 129.290 -999.990 S.. V4 2016 04 18 17 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 405379 MLO 2016 04 05 20 04 00 470-99 S co CCGG 129.190 -999.990 S.. V4 2016 04 18 16 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 405380 MLO 2016 04 05 20 49 00 1088-99 P co CCGG 123.020 -999.990 ... V4 2016 04 18 15 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 405377 MLO 2016 04 05 20 49 00 4629-99 P co CCGG 122.720 -999.990 ... V4 2016 04 18 15 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 405378 MLO 2016 04 12 20 07 00 1434-99 S co CCGG 185.330 -999.990 S.. V4 2016 04 25 12 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 405789 MLO 2016 04 12 20 07 00 647-99 S co CCGG 186.640 -999.990 S.. V4 2016 04 25 12 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 405790 MLO 2016 04 12 20 39 00 2083-99 P co CCGG 180.380 -999.990 .X. V4 2016 04 25 13 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 405788 MLO 2016 04 12 20 39 00 4595-99 P co CCGG 180.300 -999.990 .X. V4 2016 04 25 13 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 405787 MLO 2016 04 19 19 27 00 1690-99 P co CCGG 116.190 -999.990 ... V4 2016 05 19 10 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 406956 MLO 2016 04 19 19 27 00 4770-99 P co CCGG 114.880 -999.990 ... V4 2016 05 19 10 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 406957 MLO 2016 04 19 20 03 00 1946-99 S co CCGG 118.260 -999.990 S.. V4 2016 05 19 11 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 406958 MLO 2016 04 19 20 03 00 5186-99 S co CCGG 117.490 -999.990 S.. V4 2016 05 19 10 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 406959 MLO 2016 04 26 20 05 00 3829-99 S co CCGG 117.380 -999.990 S.. V4 2016 05 10 14 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 406573 MLO 2016 04 26 20 05 00 3830-99 S co CCGG 115.330 -999.990 S.. V4 2016 05 10 14 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 406574 MLO 2016 04 26 20 32 00 3671-99 P co CCGG 114.840 -999.990 ... V4 2016 05 10 14 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 406571 MLO 2016 04 26 20 32 00 3672-99 P co CCGG 115.730 -999.990 ... V4 2016 05 10 15 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 406572 MLO 2016 05 03 20 04 00 2308-99 S co CCGG 117.290 -999.990 S.. V4 2016 05 24 11 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 406908 MLO 2016 05 03 20 04 00 4669-99 S co CCGG 116.470 -999.990 S.. V4 2016 05 24 11 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 406909 MLO 2016 05 03 20 30 00 3121-99 P co CCGG 120.360 -999.990 ... V4 2016 05 24 11 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 406906 MLO 2016 05 03 20 30 00 4654-99 P co CCGG 118.720 -999.990 ... V4 2016 05 24 12 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 406907 MLO 2016 05 10 20 10 00 3069-99 S co CCGG 114.380 -999.990 S.. V4 2016 05 26 12 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 407319 MLO 2016 05 10 20 10 00 3070-99 S co CCGG 114.420 -999.990 S.. V4 2016 05 26 12 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 407320 MLO 2016 05 10 20 32 00 3573-99 P co CCGG 115.680 -999.990 ... V4 2016 05 26 11 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 407317 MLO 2016 05 10 20 32 00 3574-99 P co CCGG 113.620 -999.990 ... V4 2016 05 26 11 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 407318 MLO 2016 05 17 20 01 00 3831-99 S co CCGG 88.840 -999.990 S.. V4 2016 06 02 10 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 407662 MLO 2016 05 17 20 01 00 3832-99 S co CCGG 89.470 -999.990 S.. V4 2016 06 02 10 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 407663 MLO 2016 05 17 20 27 00 1693-99 P co CCGG 90.340 -999.990 ... V4 2016 06 02 10 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 407660 MLO 2016 05 17 20 27 00 1694-99 P co CCGG 90.510 -999.990 ... V4 2016 06 02 11 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 407661 MLO 2016 05 24 20 10 00 3585-99 S co CCGG 99.710 -999.990 S.. V4 2016 06 06 14 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 407914 MLO 2016 05 24 20 10 00 3586-99 S co CCGG 98.920 -999.990 S.. V4 2016 06 06 14 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 407915 MLO 2016 05 24 20 38 00 1057-99 P co CCGG 99.670 -999.990 ... V4 2016 06 06 14 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 408005 MLO 2016 05 24 20 38 00 1058-99 P co CCGG 100.790 -999.990 ... V4 2016 06 06 14 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 407916 MLO 2016 05 31 19 41 00 3086-99 P co CCGG 91.200 -999.990 ... V4 2016 06 15 11 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 408871 MLO 2016 05 31 19 41 00 687-99 P co CCGG 92.760 -999.990 ... V4 2016 06 15 11 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 408872 MLO 2016 05 31 20 03 00 1945-99 S co CCGG 90.270 -999.990 S.. V4 2016 06 15 10 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 408874 MLO 2016 05 31 20 03 00 3203-99 S co CCGG 91.470 -999.990 S.. V4 2016 06 15 10 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 408873 MLO 2016 06 07 20 08 00 4549-99 S co CCGG 85.590 -999.990 S.. V4 2016 06 24 12 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 408881 MLO 2016 06 07 20 08 00 4550-99 S co CCGG 85.890 -999.990 S.. V4 2016 06 24 12 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 408882 MLO 2016 06 07 20 33 00 297-99 P co CCGG 86.180 -999.990 ... V4 2016 06 24 12 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 408879 MLO 2016 06 07 20 33 00 298-99 P co CCGG 85.360 -999.990 ... V4 2016 06 24 12 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 408880 MLO 2016 06 16 20 07 00 983-99 S co CCGG 89.190 -999.990 S.. V4 2016 06 30 14 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 409400 MLO 2016 06 16 20 07 00 984-99 S co CCGG 88.980 -999.990 S.. V4 2016 06 30 15 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 409401 MLO 2016 06 16 20 40 00 2635-99 P co CCGG 90.650 -999.990 ... V4 2016 06 30 13 22 00 19.5362 -155.5763 3402.00 3397.00 5.00 409402 MLO 2016 06 16 20 40 00 2636-99 P co CCGG 91.400 -999.990 ... V4 2016 06 30 13 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 409403 MLO 2016 06 21 20 03 00 4245-99 S co CCGG 77.140 -999.990 S.. V4 2016 07 07 09 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 409596 MLO 2016 06 21 20 03 00 4246-99 S co CCGG 78.000 -999.990 S.. V4 2016 07 07 09 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 409597 MLO 2016 06 21 20 26 00 3577-99 P co CCGG 79.540 -999.990 ... V4 2016 07 06 16 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 409594 MLO 2016 06 21 20 26 00 3578-99 P co CCGG 79.780 -999.990 ... V4 2016 07 06 16 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 409595 MLO 2016 06 28 20 12 00 3717-99 S co CCGG 70.040 -999.990 S.. V4 2016 07 14 09 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 409982 MLO 2016 06 28 20 12 00 5330-99 S co CCGG 69.240 -999.990 S.. V4 2016 07 14 09 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 409981 MLO 2016 06 28 20 40 00 451-99 P co CCGG 70.550 -999.990 ... V4 2016 07 14 09 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 409980 MLO 2016 06 28 20 40 00 4861-99 P co CCGG 71.330 -999.990 ... V4 2016 07 14 09 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 409979 MLO 2016 07 05 20 11 00 1730-99 S co CCGG 68.000 -999.990 S.. V4 2016 07 18 09 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 410473 MLO 2016 07 05 20 11 00 3307-99 S co CCGG 68.080 -999.990 S.. V4 2016 07 18 09 58 00 19.5362 -155.5763 3437.00 3397.00 40.00 410474 MLO 2016 07 05 20 42 00 4839-99 P co CCGG 68.480 -999.990 ... V4 2016 07 18 10 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 410471 MLO 2016 07 05 20 42 00 5364-99 P co CCGG 70.100 -999.990 ... V4 2016 07 18 10 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 410472 MLO 2016 07 13 20 10 00 2325-99 S co CCGG 69.110 -999.990 +.. V4 2016 07 21 14 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 410774 MLO 2016 07 13 20 10 00 5064-99 S co CCGG 65.570 -999.990 -.. V4 2016 07 21 15 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 410775 MLO 2016 07 13 21 00 00 224-99 P co CCGG 68.740 -999.990 ... V4 2016 07 21 15 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 410772 MLO 2016 07 13 21 00 00 3108-99 P co CCGG 69.210 -999.990 ... V4 2016 07 21 15 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 410773 MLO 2016 07 19 20 04 00 4564-99 S co CCGG 63.780 -999.990 S.. V4 2016 08 01 11 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 411256 MLO 2016 07 19 20 04 00 516-99 S co CCGG 64.750 -999.990 S.. V4 2016 08 01 11 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 411255 MLO 2016 07 19 20 26 00 1040-99 P co CCGG 64.320 -999.990 ... V4 2016 08 01 11 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 411253 MLO 2016 07 19 20 26 00 2942-99 P co CCGG 63.910 -999.990 ... V4 2016 08 01 12 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 411254 MLO 2016 07 26 20 14 00 5324-99 S co CCGG 64.760 -999.990 S.. V4 2016 08 03 16 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 411545 MLO 2016 07 26 20 14 00 5520-99 S co CCGG 63.100 -999.990 S.. V4 2016 08 03 16 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 411546 MLO 2016 07 26 20 40 00 5516-99 P co CCGG 65.120 -999.990 ... V4 2016 08 03 16 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 411543 MLO 2016 07 26 20 40 00 5526-99 P co CCGG 64.240 -999.990 ... V4 2016 08 03 16 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 411544 MLO 2016 08 03 20 13 00 3749-99 S co CCGG 59.700 -999.990 S.. V4 2016 08 11 15 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 412034 MLO 2016 08 03 20 13 00 3750-99 S co CCGG 59.350 -999.990 S.. V4 2016 08 11 16 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 412035 MLO 2016 08 03 20 41 00 5647-99 P co CCGG 61.090 -999.990 ... V4 2016 08 15 10 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 412036 MLO 2016 08 03 20 41 00 5648-99 P co CCGG 60.920 -999.990 ... V4 2016 08 15 10 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 412037 MLO 2016 08 09 20 10 00 2178-99 S co CCGG 57.770 -999.990 S.. V4 2016 08 18 13 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 412626 MLO 2016 08 09 20 10 00 764-99 S co CCGG 57.280 -999.990 S.. V4 2016 08 18 13 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 412627 MLO 2016 08 09 20 38 00 1146-99 P co CCGG 58.350 -999.990 ... V4 2016 08 18 15 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 412624 MLO 2016 08 09 20 38 00 2021-99 P co CCGG 59.190 -999.990 ... V4 2016 08 18 15 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 412625 MLO 2016 08 16 20 05 00 168-99 S co CCGG 68.610 -999.990 S.. V4 2016 08 24 14 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 412773 MLO 2016 08 16 20 05 00 4100-99 S co CCGG 68.540 -999.990 S.. V4 2016 08 24 14 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 412772 MLO 2016 08 16 20 35 00 4737-99 P co CCGG 69.490 -999.990 ... V4 2016 08 24 15 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 412771 MLO 2016 08 16 20 35 00 5069-99 P co CCGG 67.500 -999.990 ... V4 2016 08 24 15 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 412770 MLO 2016 08 23 20 08 00 5685-99 S co CCGG 62.810 -999.990 S.. V4 2016 09 06 10 59 00 19.5362 -155.5763 3437.00 3397.00 40.00 413399 MLO 2016 08 23 20 08 00 5686-99 S co CCGG 62.760 -999.990 S.. V4 2016 09 06 11 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 413400 MLO 2016 08 23 20 36 00 5531-99 P co CCGG 63.780 -999.990 ... V4 2016 09 06 10 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 413401 MLO 2016 08 23 20 36 00 5532-99 P co CCGG 64.220 -999.990 ... V4 2016 09 06 10 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 413402 MLO 2016 08 30 20 06 00 5561-99 S co CCGG 72.950 -999.990 S.. V4 2016 09 22 15 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 413754 MLO 2016 08 30 20 06 00 5562-99 S co CCGG 72.440 -999.990 S.. V4 2016 09 22 15 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 413755 MLO 2016 08 30 20 30 00 5683-99 P co CCGG 73.810 -999.990 ... V4 2016 09 22 14 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 413756 MLO 2016 08 30 20 30 00 5684-99 P co CCGG 74.660 -999.990 ... V4 2016 09 22 15 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 413757 MLO 2016 09 06 20 12 00 3617-99 S co CCGG 87.190 -999.990 S.. V4 2016 09 28 15 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 414025 MLO 2016 09 06 20 12 00 3618-99 S co CCGG 87.380 -999.990 S.. V4 2016 09 28 15 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 414026 MLO 2016 09 06 20 47 00 2695-99 P co CCGG 93.580 -999.990 ... V4 2016 09 28 16 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 414023 MLO 2016 09 06 20 47 00 2696-99 P co CCGG 92.440 -999.990 ... V4 2016 09 28 16 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 414024 MLO 2016 09 13 20 06 00 5427-99 S co CCGG 64.680 -999.990 S.. V4 2016 10 04 13 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 414329 MLO 2016 09 13 20 06 00 5428-99 S co CCGG 63.370 -999.990 S.. V4 2016 10 04 14 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 414330 MLO 2016 09 13 20 28 00 5447-99 P co CCGG 65.180 -999.990 ... V4 2016 10 04 13 15 00 19.5362 -155.5763 3402.00 3397.00 5.00 414331 MLO 2016 09 13 20 28 00 5448-99 P co CCGG 65.950 -999.990 ... V4 2016 10 04 13 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 414332 MLO 2016 09 20 20 09 00 749-99 S co CCGG 75.840 -999.990 S.. V4 2016 10 27 11 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 415550 MLO 2016 09 20 20 09 00 750-99 S co CCGG 75.550 -999.990 S.. V4 2016 10 27 11 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 415551 MLO 2016 09 20 20 37 00 643-99 P co CCGG 80.500 -999.990 ... V4 2016 10 27 12 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 415553 MLO 2016 09 20 20 37 00 644-99 P co CCGG 81.010 -999.990 ... V4 2016 10 27 12 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 415552 MLO 2016 09 27 20 02 00 3445-99 S co CCGG 74.730 -999.990 S.. V4 2016 10 18 12 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 415198 MLO 2016 09 27 20 02 00 5350-99 S co CCGG 74.100 -999.990 S.. V4 2016 10 18 13 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 415199 MLO 2016 09 27 20 45 00 1153-99 P co CCGG 73.140 -999.990 ... V4 2016 10 18 13 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 415200 MLO 2016 09 27 20 45 00 1630-99 P co CCGG 74.630 -999.990 ... V4 2016 10 18 13 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 415201 MLO 2016 10 04 20 11 00 3491-99 S co CCGG 75.510 -999.990 S.. V4 2016 10 19 10 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 415230 MLO 2016 10 04 20 11 00 4971-99 S co CCGG 76.150 -999.990 S.. V4 2016 10 19 10 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 415231 MLO 2016 10 04 20 39 00 2663-99 P co CCGG 76.210 -999.990 ... V4 2016 10 19 09 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 415232 MLO 2016 10 04 20 39 00 3567-99 P co CCGG 76.400 -999.990 ... V4 2016 10 19 09 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 415233 MLO 2016 10 11 20 10 00 2997-99 S co CCGG 77.120 -999.990 S.. V4 2016 10 27 11 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 415548 MLO 2016 10 11 20 10 00 4239-99 S co CCGG 77.470 -999.990 S.. V4 2016 10 27 11 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 415549 MLO 2016 10 11 20 57 00 2780-99 P co CCGG 83.920 -999.990 ... V4 2016 10 27 10 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 415547 MLO 2016 10 11 20 57 00 3161-99 P co CCGG 82.810 -999.990 ... V4 2016 10 27 10 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 415546 MLO 2016 10 18 20 05 00 1695-99 S co CCGG 73.330 -999.990 S.. V4 2016 11 17 15 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 416815 MLO 2016 10 18 20 05 00 528-99 S co CCGG 73.110 -999.990 S.. V4 2016 11 17 14 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 416816 MLO 2016 10 18 20 32 00 784-99 P co CCGG 78.110 -999.990 ... V4 2016 11 17 10 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 416813 MLO 2016 10 18 20 32 00 930-99 P co CCGG 76.200 -999.990 ... V4 2016 11 17 10 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 416814 MLO 2016 10 25 20 04 00 2440-99 S co CCGG 76.570 -999.990 S.. V4 2016 11 08 14 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 416290 MLO 2016 10 25 20 04 00 3165-99 S co CCGG 76.480 -999.990 S.. V4 2016 11 08 14 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 416291 MLO 2016 10 25 20 26 00 1066-99 P co CCGG 77.200 -999.990 ... V4 2016 11 08 13 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 416288 MLO 2016 10 25 20 26 00 3209-99 P co CCGG 77.530 -999.990 ... V4 2016 11 08 14 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 416289 MLO 2016 11 01 20 02 00 5072-99 S co CCGG 74.280 -999.990 S.. V4 2016 11 15 15 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 416607 MLO 2016 11 01 20 02 00 689-99 S co CCGG 75.030 -999.990 S.. V4 2016 11 15 15 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 416608 MLO 2016 11 01 20 28 00 1656-99 P co CCGG 76.520 -999.990 ... V4 2016 11 15 12 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 416605 MLO 2016 11 01 20 28 00 5189-99 P co CCGG 76.730 -999.990 ... V4 2016 11 15 13 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 416606 MLO 2016 11 08 20 08 00 2319-99 S co CCGG 89.810 -999.990 S.. V4 2016 12 08 14 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 417681 MLO 2016 11 08 20 08 00 3917-99 S co CCGG 90.030 -999.990 S.. V4 2016 12 08 14 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 417682 MLO 2016 11 08 20 30 00 1600-99 P co CCGG 91.310 -999.990 ... V4 2016 12 08 14 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 417684 MLO 2016 11 08 20 30 00 849-99 P co CCGG 91.330 -999.990 ... V4 2016 12 08 13 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 417683 MLO 2016 11 15 20 41 00 4672-99 P co CCGG 109.810 -999.990 ... V4 2016 11 30 12 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 417284 MLO 2016 11 15 20 41 00 907-99 P co CCGG 108.900 -999.990 ... V4 2016 11 30 12 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 417283 MLO 2016 11 15 21 10 00 3805-99 S co CCGG 106.570 -999.990 S.. V4 2016 12 01 10 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 417501 MLO 2016 11 15 21 10 00 515-99 S co CCGG 108.120 -999.990 S.. V4 2016 12 01 10 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 417500 MLO 2016 11 22 20 05 00 4726-99 S co CCGG 86.920 -999.990 S.. V4 2016 12 28 14 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 418467 MLO 2016 11 22 20 05 00 5168-99 S co CCGG 87.090 -999.990 S.. V4 2016 12 28 14 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 418468 MLO 2016 11 22 20 34 00 5002-99 P co CCGG 89.000 -999.990 ... V4 2016 12 28 15 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 418465 MLO 2016 11 22 20 34 00 523-99 P co CCGG 88.360 -999.990 ... V4 2016 12 28 14 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 418466 MLO 2016 11 29 20 06 00 2354-99 S co CCGG 88.730 -999.990 S.. V4 2016 12 12 13 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 417845 MLO 2016 11 29 20 06 00 565-99 S co CCGG 87.660 -999.990 S.. V4 2016 12 12 12 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 417846 MLO 2016 11 29 20 38 00 5573-99 P co CCGG 87.010 -999.990 ... V4 2016 12 12 12 12 00 19.5362 -155.5763 3402.00 3397.00 5.00 417847 MLO 2016 11 29 20 38 00 5717-99 P co CCGG 86.740 -999.990 ... V4 2016 12 12 12 28 00 19.5362 -155.5763 3402.00 3397.00 5.00 417848 MLO 2016 12 06 20 14 00 1823-99 S co CCGG 60.670 -999.990 S.. V4 2016 12 30 14 50 00 19.5362 -155.5763 3437.00 3397.00 40.00 418604 MLO 2016 12 06 20 14 00 1824-99 S co CCGG 61.710 -999.990 S.. V4 2016 12 30 15 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 418605 MLO 2016 12 06 20 49 00 5177-99 P co CCGG 61.700 -999.990 ... V4 2016 12 30 14 18 00 19.5362 -155.5763 3402.00 3397.00 5.00 418602 MLO 2016 12 06 20 49 00 5178-99 P co CCGG 62.060 -999.990 ... V4 2016 12 30 14 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 418603 MLO 2016 12 13 20 11 00 5285-99 S co CCGG 93.770 -999.990 S.. V4 2017 01 03 12 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 418609 MLO 2016 12 13 20 11 00 566-99 S co CCGG 94.370 -999.990 S.. V4 2017 01 03 11 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 418608 MLO 2016 12 13 20 35 00 1961-99 P co CCGG 97.110 -999.990 ... V4 2017 01 03 12 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 418610 MLO 2016 12 13 20 35 00 2369-99 P co CCGG 97.220 -999.990 ... V4 2017 01 03 12 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 418611 MLO 2016 12 20 20 10 00 5213-99 S co CCGG 76.200 -999.990 S.. V4 2017 01 10 12 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 418805 MLO 2016 12 20 20 10 00 5214-99 S co CCGG 75.610 -999.990 S.. V4 2017 01 10 13 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 418806 MLO 2016 12 20 20 49 00 3671-99 P co CCGG 74.050 -999.990 ... V4 2017 01 10 13 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 418807 MLO 2016 12 20 20 49 00 3672-99 P co CCGG 75.550 -999.990 ... V4 2017 01 10 13 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 418808 MLO 2016 12 27 20 18 00 3563-99 S co CCGG 80.400 -999.990 S.. V4 2017 01 31 14 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 419823 MLO 2016 12 27 20 18 00 519-99 S co CCGG 81.300 -999.990 S.. V4 2017 01 31 13 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 419822 MLO 2016 12 27 20 44 00 4279-99 P co CCGG 80.840 -999.990 ... V4 2017 01 31 14 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 419820 MLO 2016 12 27 20 44 00 4294-99 P co CCGG 80.680 -999.990 ... V4 2017 01 31 14 40 00 19.5362 -155.5763 3402.00 3397.00 5.00 419821 MLO 2017 01 03 20 18 00 4841-99 S co CCGG 90.400 -999.990 S.. V4 2017 02 10 14 09 00 19.5362 -155.5763 3437.00 3397.00 40.00 420401 MLO 2017 01 03 20 18 00 826-99 S co CCGG 90.320 -999.990 S.. V4 2017 02 10 13 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 420400 MLO 2017 01 03 20 47 00 4757-99 P co CCGG 95.180 -999.990 ... V4 2017 02 10 12 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 420399 MLO 2017 01 03 20 47 00 952-99 P co CCGG 95.160 -999.990 ... V4 2017 02 10 12 18 00 19.5362 -155.5763 3402.00 3397.00 5.00 420398 MLO 2017 01 11 20 14 00 1023-99 S co CCGG 78.270 -999.990 S.. V4 2017 02 09 14 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 420404 MLO 2017 01 11 20 14 00 2307-99 S co CCGG 77.900 -999.990 S.. V4 2017 02 09 15 09 00 19.5362 -155.5763 3437.00 3397.00 40.00 420405 MLO 2017 01 11 20 48 00 1184-99 P co CCGG 77.720 -999.990 ... V4 2017 02 09 15 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 420402 MLO 2017 01 11 20 48 00 1770-99 P co CCGG 76.770 -999.990 ... V4 2017 02 09 15 40 00 19.5362 -155.5763 3402.00 3397.00 5.00 420403 MLO 2017 01 18 20 04 00 2812-99 P co CCGG 91.530 -999.990 ... V4 2017 02 03 10 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 419930 MLO 2017 01 18 20 04 00 4809-99 P co CCGG 90.430 -999.990 ... V4 2017 02 03 10 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 419931 MLO 2017 01 18 20 14 00 1744-99 S co CCGG 90.450 -999.990 S.. V4 2017 02 03 10 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 419932 MLO 2017 01 18 20 14 00 2535-99 S co CCGG 90.370 -999.990 S.. V4 2017 02 03 10 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 419933 MLO 2017 01 25 20 19 00 4787-99 S co CCGG 130.300 -999.990 S.. V4 2017 02 08 11 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 420155 MLO 2017 01 25 20 19 00 4788-99 S co CCGG 129.270 -999.990 S.. V4 2017 02 08 11 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 420156 MLO 2017 01 25 20 42 00 3033-99 P co CCGG 132.380 -999.990 .X. V4 2017 02 09 14 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 420153 MLO 2017 01 25 20 42 00 3034-99 P co CCGG 131.310 -999.990 .X. V4 2017 02 09 14 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 420154 MLO 2017 02 01 20 06 00 1568-99 P co CCGG 118.850 -999.990 ... V4 2017 02 13 13 56 00 19.5362 -155.5763 3402.00 3397.00 5.00 420619 MLO 2017 02 01 20 06 00 4862-99 P co CCGG 118.210 -999.990 ... V4 2017 02 13 14 12 00 19.5362 -155.5763 3402.00 3397.00 5.00 420620 MLO 2017 02 01 20 12 00 4909-99 S co CCGG 118.590 -999.990 S.. V4 2017 02 13 14 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 420621 MLO 2017 02 01 20 12 00 5217-99 S co CCGG 119.380 -999.990 S.. V4 2017 02 13 14 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 420622 MLO 2017 02 08 20 08 00 3829-99 P co CCGG 86.460 -999.990 ... V4 2017 02 23 13 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 421087 MLO 2017 02 08 20 08 00 3830-99 P co CCGG 85.640 -999.990 ... V4 2017 02 23 13 18 00 19.5362 -155.5763 3402.00 3397.00 5.00 421088 MLO 2017 02 08 20 13 00 3001-99 S co CCGG 86.110 -999.990 S.. V4 2017 02 23 12 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 421085 MLO 2017 02 08 20 13 00 3002-99 S co CCGG 84.750 -999.990 S.. V4 2017 02 23 12 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 421086 MLO 2017 02 16 20 07 00 1297-99 P co CCGG 70.120 -999.990 ... V4 2017 03 03 10 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 421628 MLO 2017 02 16 20 07 00 5615-99 P co CCGG 69.600 -999.990 ... V4 2017 03 03 11 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 421629 MLO 2017 02 16 20 16 00 1722-99 S co CCGG 67.860 -999.990 S.. V4 2017 03 03 10 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 421626 MLO 2017 02 16 20 16 00 1949-99 S co CCGG 69.140 -999.990 S.. V4 2017 03 03 10 32 00 19.5362 -155.5763 3437.00 3397.00 40.00 421627 MLO 2017 02 23 20 18 00 1053-99 S co CCGG 100.050 -999.990 S.. V4 2017 03 13 12 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 422232 MLO 2017 02 23 20 18 00 1147-99 S co CCGG 101.020 -999.990 S.. V4 2017 03 13 12 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 422233 MLO 2017 02 23 20 47 00 1396-99 P co CCGG 99.610 -999.990 ... V4 2017 03 13 12 23 00 19.5362 -155.5763 3402.00 3397.00 5.00 422230 MLO 2017 02 23 20 47 00 605-99 P co CCGG 99.460 -999.990 ... V4 2017 03 13 12 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 422231 MLO 2017 03 07 20 00 00 2464-99 S co CCGG 88.040 -999.990 S.. V4 2017 03 29 17 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 422899 MLO 2017 03 07 20 00 00 2891-99 S co CCGG 88.250 -999.990 S.. V4 2017 03 29 17 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 422900 MLO 2017 03 07 20 04 00 3842-99 P co CCGG 88.920 -999.990 ... V4 2017 03 30 08 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 422897 MLO 2017 03 07 20 04 00 5374-99 P co CCGG 88.440 -999.990 ... V4 2017 03 30 08 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 422898 MLO 2017 03 14 20 15 00 3839-99 S co CCGG 91.820 -999.990 S.. V4 2017 04 04 16 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 423134 MLO 2017 03 14 20 15 00 449-99 S co CCGG 92.540 -999.990 S.. V4 2017 04 04 15 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 423133 MLO 2017 03 14 20 18 00 1196-99 P co CCGG 94.000 -999.990 ... V4 2017 04 04 16 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 423131 MLO 2017 03 14 20 18 00 445-99 P co CCGG 92.590 -999.990 ... V4 2017 04 04 16 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 423132 MLO 2017 03 21 19 56 00 1592-99 P co CCGG 86.780 -999.990 ... V4 2017 04 07 13 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 423404 MLO 2017 03 21 19 56 00 2279-99 P co CCGG 87.760 -999.990 ... V4 2017 04 07 13 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 423403 MLO 2017 03 21 20 04 00 1463-99 S co CCGG 86.510 -999.990 S.. V4 2017 04 07 14 14 00 19.5362 -155.5763 3437.00 3397.00 40.00 423401 MLO 2017 03 21 20 04 00 4968-99 S co CCGG 86.750 -999.990 S.. V4 2017 04 07 14 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 423402 MLO 2017 03 28 20 09 00 2988-99 S co CCGG 109.350 -999.990 S.. V4 2017 04 14 14 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 423695 MLO 2017 03 28 20 09 00 5497-99 S co CCGG 109.220 -999.990 S.. V4 2017 04 14 15 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 423696 MLO 2017 03 28 20 10 00 4146-99 P co CCGG 108.830 -999.990 ... V4 2017 04 14 14 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 423697 MLO 2017 03 28 20 10 00 4675-99 P co CCGG 109.130 -999.990 ... V4 2017 04 14 14 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 423698 MLO 2017 04 04 19 30 00 3503-99 P co CCGG 107.940 -999.990 ... V4 2017 04 24 12 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 423995 MLO 2017 04 04 19 30 00 975-99 P co CCGG 108.440 -999.990 ... V4 2017 04 24 11 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 423996 MLO 2017 04 04 20 04 00 1585-99 S co CCGG 112.200 -999.990 S.. V4 2017 04 24 13 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 423997 MLO 2017 04 04 20 04 00 4992-99 S co CCGG 110.650 -999.990 S.. V4 2017 04 24 13 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 423998 MLO 2017 04 11 19 56 00 1753-99 P co CCGG 100.550 -999.990 ... V4 2017 04 27 11 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 424355 MLO 2017 04 11 19 56 00 3213-99 P co CCGG 99.610 -999.990 ... V4 2017 04 27 11 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 424356 MLO 2017 04 11 19 58 00 2076-99 S co CCGG 102.760 -999.990 S.. V4 2017 04 27 11 58 00 19.5362 -155.5763 3437.00 3397.00 40.00 424354 MLO 2017 04 11 19 58 00 788-99 S co CCGG 101.940 -999.990 S.. V4 2017 04 27 11 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 424353 MLO 2017 04 18 20 20 00 2113-99 S co CCGG 108.960 -999.990 S.. V4 2017 05 03 12 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 424531 MLO 2017 04 18 20 20 00 2114-99 S co CCGG 109.700 -999.990 S.. V4 2017 05 03 12 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 424532 MLO 2017 04 18 20 22 00 4987-99 P co CCGG 110.410 -999.990 ... V4 2017 05 03 12 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 424533 MLO 2017 04 18 20 22 00 4988-99 P co CCGG 110.450 -999.990 ... V4 2017 05 03 13 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 424534 MLO 2017 04 25 20 05 00 49-99 P co CCGG 102.650 -999.990 ... V4 2017 05 08 15 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 424726 MLO 2017 04 25 20 05 00 50-99 P co CCGG 101.500 -999.990 ... V4 2017 05 08 16 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 424727 MLO 2017 04 25 20 10 00 5301-99 S co CCGG 102.720 -999.990 S.. V4 2017 05 08 16 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 424724 MLO 2017 04 25 20 10 00 5302-99 S co CCGG 101.760 -999.990 S.. V4 2017 05 08 16 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 424725 MLO 2017 05 02 19 39 00 261-99 P co CCGG 88.360 -999.990 ... V4 2017 05 16 08 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 425221 MLO 2017 05 02 19 39 00 262-99 P co CCGG 89.220 -999.990 ... V4 2017 05 16 08 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 425222 MLO 2017 05 02 20 09 00 61-99 S co CCGG 87.340 -999.990 ... V4 2017 05 15 17 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 425219 MLO 2017 05 02 20 09 00 62-99 S co CCGG 97.240 -999.990 N.. V4 2017 05 15 17 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 425220 MLO 2017 05 09 19 43 00 3961-99 P co CCGG 95.110 -999.990 ... V2 2017 05 30 15 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 425829 MLO 2017 05 09 19 43 00 5127-99 P co CCGG 95.420 -999.990 ... V2 2017 05 30 15 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 425830 MLO 2017 05 09 20 05 00 1087-99 S co CCGG 94.380 -999.990 S.. V2 2017 05 30 16 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 425827 MLO 2017 05 09 20 05 00 2262-99 S co CCGG 93.350 -999.990 S.. V2 2017 05 30 16 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 425828 MLO 2017 05 16 19 46 00 1017-99 P co CCGG 93.700 -999.990 ... V2 2017 06 05 15 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 426099 MLO 2017 05 16 19 46 00 3767-99 P co CCGG 93.430 -999.990 ... V2 2017 06 05 15 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 426100 MLO 2017 05 16 20 00 00 2032-99 S co CCGG 95.240 -999.990 S.. V2 2017 06 05 14 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 426098 MLO 2017 05 16 20 00 00 850-99 S co CCGG 95.790 -999.990 S.. V2 2017 06 05 14 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 426097 MLO 2017 05 23 20 04 00 2178-99 S co CCGG 88.710 -999.990 S.. V2 2017 06 13 13 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 426396 MLO 2017 05 23 20 30 00 4239-99 P co CCGG 89.720 -999.990 ... V2 2017 06 13 13 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 426395 MLO 2017 05 23 20 30 00 764-99 P co CCGG 90.240 -999.990 ... V2 2017 06 13 13 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 426394 MLO 2017 05 30 20 08 00 2794-99 S co CCGG 85.700 -999.990 S.. V2 2017 06 14 13 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 426549 MLO 2017 05 30 20 08 00 3704-99 S co CCGG 87.060 -999.990 S.. V2 2017 06 14 14 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 426550 MLO 2017 05 30 20 37 00 268-99 P co CCGG 86.730 -999.990 ... V2 2017 06 14 14 56 00 19.5362 -155.5763 3402.00 3397.00 5.00 426551 MLO 2017 05 30 20 37 00 5266-99 P co CCGG 86.530 -999.990 ... V2 2017 06 14 15 12 00 19.5362 -155.5763 3402.00 3397.00 5.00 426552 MLO 2017 06 06 19 47 00 3324-99 P co CCGG -999.990 -999.990 *.. V2 2017 06 21 10 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 426920 MLO 2017 06 06 19 47 00 731-99 P co CCGG -999.990 -999.990 *.. V2 2017 06 21 10 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 426921 MLO 2017 06 06 20 11 00 216-99 S co CCGG -999.990 -999.990 -.. V2 2017 06 21 10 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 426918 MLO 2017 06 06 20 11 00 2491-99 S co CCGG 82.450 -999.990 +.. V2 2017 06 21 11 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 426919 MLO 2017 06 13 20 04 00 3170-99 S co CCGG 75.340 -999.990 S.. V2 2017 06 23 13 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 427201 MLO 2017 06 13 20 04 00 5363-99 S co CCGG 75.140 -999.990 S.. V2 2017 06 23 13 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 427202 MLO 2017 06 13 20 29 00 3596-99 P co CCGG 76.710 -999.990 ... V2 2017 06 26 14 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 427269 MLO 2017 06 13 20 29 00 4490-99 P co CCGG 76.750 -999.990 ... V2 2017 06 26 15 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 427270 MLO 2017 06 19 20 01 00 4553-99 S co CCGG 66.820 -999.990 S.. V2 2017 07 12 11 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 427515 MLO 2017 06 19 20 01 00 5229-99 S co CCGG 65.790 -999.990 S.. V2 2017 07 12 12 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 427516 MLO 2017 06 19 20 33 00 489-99 P co CCGG 69.450 -999.990 ... V2 2017 07 12 11 12 00 19.5362 -155.5763 3402.00 3397.00 5.00 427513 MLO 2017 06 19 20 33 00 5332-99 P co CCGG 68.500 -999.990 ... V2 2017 07 12 11 28 00 19.5362 -155.5763 3402.00 3397.00 5.00 427514 MLO 2017 06 27 20 09 00 1832-99 S co CCGG 73.670 -999.990 S.. V2 2017 07 19 10 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 427829 MLO 2017 06 27 20 09 00 2502-99 S co CCGG 74.100 -999.990 S.. V2 2017 07 19 10 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 427830 MLO 2017 06 27 20 53 00 5624-99 P co CCGG 75.190 -999.990 ... V2 2017 07 19 13 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 427828 MLO 2017 06 27 20 53 00 979-99 P co CCGG 75.080 -999.990 ... V2 2017 07 19 12 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 427827 MLO 2017 07 03 20 03 00 3786-99 S co CCGG 65.550 -999.990 S.. V2 2017 07 21 14 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 427983 MLO 2017 07 03 20 03 00 4574-99 S co CCGG 65.270 -999.990 S.. V2 2017 07 21 14 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 427984 MLO 2017 07 03 20 37 00 4058-99 P co CCGG 66.420 -999.990 ... V2 2017 07 24 10 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 428002 MLO 2017 07 03 20 37 00 4147-99 P co CCGG 66.610 -999.990 ... V2 2017 07 24 11 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 428001 MLO 2017 07 11 20 03 00 2698-99 S co CCGG 67.420 -999.990 S.. V2 2017 07 28 11 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 428365 MLO 2017 07 11 20 03 00 5262-99 S co CCGG 67.460 -999.990 S.. V2 2017 07 28 11 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 428366 MLO 2017 07 11 20 28 00 1600-99 P co CCGG 68.320 -999.990 ... V2 2017 07 27 15 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 428367 MLO 2017 07 11 20 28 00 3090-99 P co CCGG 67.610 -999.990 ... V2 2017 07 27 15 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 428368 MLO 2017 07 18 20 08 00 4428-99 S co CCGG 71.270 -999.990 S.. V2 2017 08 07 11 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 428771 MLO 2017 07 18 20 08 00 954-99 S co CCGG 71.170 -999.990 S.. V2 2017 08 07 11 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 428770 MLO 2017 07 18 20 35 00 1788-99 P co CCGG 73.080 -999.990 ... V2 2017 08 07 10 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 428772 MLO 2017 07 18 20 35 00 3715-99 P co CCGG 73.400 -999.990 ... V2 2017 08 07 11 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 428773 MLO 2017 07 25 20 05 00 1574-99 S co CCGG 61.660 -999.990 S.. V2 2017 08 10 13 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 428879 MLO 2017 07 25 20 05 00 957-99 S co CCGG 60.760 -999.990 S.. V2 2017 08 10 13 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 428880 MLO 2017 07 25 20 32 00 3893-99 P co CCGG 63.420 -999.990 ... V2 2017 08 09 16 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 428866 MLO 2017 07 25 20 32 00 948-99 P co CCGG 62.910 -999.990 ... V2 2017 08 09 16 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 428865 MLO 2017 08 01 20 04 00 151-99 S co CCGG 68.130 -999.990 S.. V2 2017 08 17 11 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 429172 MLO 2017 08 01 20 04 00 4403-99 S co CCGG 68.580 -999.990 S.. V2 2017 08 17 11 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 429173 MLO 2017 08 01 20 30 00 180-99 P co CCGG 67.100 -999.990 ... V2 2017 08 17 08 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 429268 MLO 2017 08 01 20 30 00 5410-99 P co CCGG 66.680 -999.990 ... V2 2017 08 17 09 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 429269 MLO 2017 08 08 20 02 00 1082-99 S co CCGG 57.660 -999.990 S.. V2 2017 08 29 08 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 429503 MLO 2017 08 08 20 02 00 5657-99 S co CCGG 56.770 -999.990 S.. V2 2017 08 29 09 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 429504 MLO 2017 08 08 20 27 00 3227-99 P co CCGG 60.150 -999.990 ... V2 2017 08 28 15 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 429501 MLO 2017 08 08 20 27 00 4180-99 P co CCGG 59.850 -999.990 ... V2 2017 08 28 15 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 429502 MLO 2017 08 15 20 07 00 2435-99 S co CCGG 63.030 -999.990 S.. V2 2017 09 01 13 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 430094 MLO 2017 08 15 20 07 00 3020-99 S co CCGG 63.780 -999.990 S.. V2 2017 09 01 13 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 430095 MLO 2017 08 15 20 31 00 4262-99 P co CCGG 65.260 -999.990 ... V2 2017 09 01 13 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 430096 MLO 2017 08 15 20 31 00 5071-99 P co CCGG 64.790 -999.990 ... V2 2017 09 01 13 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 430097 MLO 2017 08 22 20 09 00 1958-99 S co CCGG 61.990 -999.990 S.. V2 2017 09 12 15 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 430329 MLO 2017 08 22 20 09 00 4806-99 S co CCGG 62.370 -999.990 S.. V2 2017 09 12 16 09 00 19.5362 -155.5763 3437.00 3397.00 40.00 430330 MLO 2017 08 22 20 36 00 2318-99 P co CCGG 62.360 -999.990 ... V2 2017 09 12 15 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 430331 MLO 2017 08 22 20 36 00 3174-99 P co CCGG 63.900 -999.990 ... V2 2017 09 12 15 37 00 19.5362 -155.5763 3402.00 3397.00 5.00 430332 MLO 2017 08 29 20 05 00 4910-99 S co CCGG 61.220 -999.990 S.. V2 2017 09 19 13 58 00 19.5362 -155.5763 3437.00 3397.00 40.00 430776 MLO 2017 08 29 20 05 00 54-99 S co CCGG 61.110 -999.990 S.. V2 2017 09 19 13 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 430775 MLO 2017 08 29 20 09 00 1716-99 P co CCGG 62.040 -999.990 ... V2 2017 09 19 13 27 00 19.5362 -155.5763 3402.00 3397.00 5.00 430777 MLO 2017 08 29 20 09 00 696-99 P co CCGG 62.620 -999.990 ... V2 2017 09 19 13 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 430778 MLO 2017 09 05 20 08 00 629-99 S co CCGG 63.260 -999.990 S.. V2 2017 09 21 09 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 431234 MLO 2017 09 05 20 08 00 819-99 S co CCGG 64.000 -999.990 S.. V2 2017 09 21 09 50 00 19.5362 -155.5763 3437.00 3397.00 40.00 431235 MLO 2017 09 05 20 35 00 2237-99 P co CCGG 66.150 -999.990 ... V2 2017 09 21 10 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 431232 MLO 2017 09 05 20 35 00 4220-99 P co CCGG 65.260 -999.990 ... V2 2017 09 21 10 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 431233 MLO 2017 09 12 19 39 00 2388-99 P co CCGG 77.120 -999.990 ... V2 2017 09 28 16 15 00 19.5362 -155.5763 3402.00 3397.00 5.00 431345 MLO 2017 09 12 19 39 00 4908-99 P co CCGG 76.430 -999.990 ... V2 2017 09 28 16 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 431344 MLO 2017 09 12 20 04 00 268-99 S co CCGG 73.230 -999.990 S.. V2 2017 09 29 08 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 431347 MLO 2017 09 12 20 04 00 428-99 S co CCGG 75.020 -999.990 S.. V2 2017 09 29 09 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 431346 MLO 2017 09 19 20 05 00 5266-99 S co CCGG 77.900 -999.990 S.. V2 2017 10 05 10 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 431628 MLO 2017 09 19 20 05 00 907-99 S co CCGG 77.610 -999.990 S.. V2 2017 10 05 10 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 431627 MLO 2017 09 19 20 37 00 1164-99 P co CCGG 78.750 -999.990 ... V2 2017 10 05 11 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 431625 MLO 2017 09 19 20 37 00 2419-99 P co CCGG 79.420 -999.990 ... V2 2017 10 05 11 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 431626 MLO 2017 09 26 20 04 00 1386-99 P co CCGG 76.490 -999.990 ... V2 2017 10 11 13 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 431941 MLO 2017 09 26 20 04 00 2331-99 P co CCGG 76.970 -999.990 ... V2 2017 10 11 13 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 431940 MLO 2017 09 26 20 10 00 2176-99 S co CCGG 76.010 -999.990 S.. V2 2017 10 11 13 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 431942 MLO 2017 09 26 20 10 00 3665-99 S co CCGG 75.490 -999.990 S.. V2 2017 10 11 13 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 431943 MLO 2017 10 03 20 02 00 1487-99 S co CCGG 73.040 -999.990 S.. V2 2017 10 13 16 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 432354 MLO 2017 10 03 20 02 00 2557-99 S co CCGG 73.140 -999.990 S.. V2 2017 10 13 16 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 432355 MLO 2017 10 03 20 27 00 4325-99 P co CCGG 75.410 -999.990 ... V2 2017 10 13 17 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 432352 MLO 2017 10 03 20 27 00 726-99 P co CCGG 75.760 -999.990 ... V2 2017 10 13 16 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 432353 MLO 2017 10 10 20 05 00 1432-99 S co CCGG 80.590 -999.990 S.. V2 2017 10 19 15 30 00 19.5362 -155.5763 3437.00 3397.00 40.00 432729 MLO 2017 10 10 20 05 00 4541-99 S co CCGG 80.390 -999.990 S.. V2 2017 10 19 15 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 432730 MLO 2017 10 10 20 29 00 4952-99 P co CCGG 83.870 -999.990 ... V2 2017 10 19 14 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 432727 MLO 2017 10 10 20 29 00 5315-99 P co CCGG 82.720 -999.990 ... V2 2017 10 19 15 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 432728 MLO 2017 10 17 20 00 00 2125-99 S co CCGG 88.240 -999.990 S.. V2 2017 11 02 12 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 433146 MLO 2017 10 17 20 00 00 3638-99 S co CCGG 87.280 -999.990 S.. V2 2017 11 02 12 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 433147 MLO 2017 10 17 20 31 00 3154-99 P co CCGG 88.940 -999.990 ... V2 2017 11 02 13 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 433148 MLO 2017 10 17 20 31 00 769-99 P co CCGG 89.090 -999.990 ... V2 2017 11 02 13 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 433149 MLO 2017 10 26 20 07 00 2421-99 S co CCGG 84.760 -999.990 S.. V2 2017 11 07 13 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 433508 MLO 2017 10 26 20 07 00 4040-99 S co CCGG 83.290 -999.990 S.. V2 2017 11 07 13 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 433509 MLO 2017 10 26 20 33 00 1156-99 P co CCGG 86.250 -999.990 ... V2 2017 11 07 13 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 433510 MLO 2017 10 26 20 33 00 3614-99 P co CCGG 85.620 -999.990 ... V2 2017 11 07 13 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 433511 MLO 2017 10 31 20 08 00 2127-99 S co CCGG 71.500 -999.990 S.. V2 2017 11 15 10 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 434025 MLO 2017 10 31 20 08 00 2128-99 S co CCGG 72.180 -999.990 S.. V2 2017 11 15 10 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 434026 MLO 2017 10 31 20 39 00 895-99 P co CCGG 73.040 -999.990 ... V2 2017 11 15 14 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 434057 MLO 2017 10 31 20 39 00 896-99 P co CCGG 73.040 -999.990 ... V2 2017 11 15 15 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 434058 MLO 2017 11 07 20 01 00 1636-99 S co CCGG 91.410 -999.990 S.. V2 2017 11 21 11 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 434464 MLO 2017 11 07 20 01 00 4124-99 S co CCGG 91.370 -999.990 S.. V2 2017 11 21 11 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 434465 MLO 2017 11 07 20 29 00 1575-99 P co CCGG 93.400 -999.990 ... V2 2017 11 21 11 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 434466 MLO 2017 11 07 20 29 00 2981-99 P co CCGG 92.540 -999.990 ... V2 2017 11 21 11 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 434467 MLO 2017 11 13 20 09 00 3213-99 S co CCGG 83.650 -999.990 S.. V2 2017 11 27 13 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 434566 MLO 2017 11 13 20 09 00 5539-99 S co CCGG 83.030 -999.990 S.. V2 2017 11 27 13 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 434567 MLO 2017 11 13 20 35 00 1776-99 P co CCGG 77.320 -999.990 ... V2 2017 12 01 08 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 434763 MLO 2017 11 13 20 35 00 3281-99 P co CCGG 76.990 -999.990 ... V2 2017 12 01 08 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 434764 MLO 2017 11 21 19 35 00 1026-99 P co CCGG 97.210 -999.990 ... V2 2017 12 11 13 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 435078 MLO 2017 11 21 19 35 00 1415-99 P co CCGG 98.260 -999.990 ... V2 2017 12 11 14 03 00 19.5362 -155.5763 3402.00 3397.00 5.00 435079 MLO 2017 11 21 20 03 00 1068-99 S co CCGG 92.880 -999.990 S.. V2 2017 12 11 13 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 435076 MLO 2017 11 21 20 03 00 3030-99 S co CCGG 92.540 -999.990 S.. V2 2017 12 11 13 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 435077 MLO 2017 11 28 20 11 00 22-99 S co CCGG 92.750 -999.990 S.. V2 2017 12 11 10 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 435255 MLO 2017 11 28 20 11 00 5636-99 S co CCGG 91.370 -999.990 S.. V2 2017 12 11 10 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 435256 MLO 2017 11 28 21 07 00 1250-99 P co CCGG 91.830 -999.990 ... V2 2017 12 13 10 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 435245 MLO 2017 11 28 21 07 00 3593-99 P co CCGG 91.360 -999.990 ... V2 2017 12 13 11 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 435246 MLO 2017 12 05 20 01 00 1576-99 P co CCGG 97.460 -999.990 ... V2 2017 12 20 14 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 435785 MLO 2017 12 05 20 01 00 903-99 P co CCGG 97.010 -999.990 ... V2 2017 12 20 14 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 435784 MLO 2017 12 05 20 16 00 1011-99 S co CCGG 96.190 -999.990 S.. V2 2017 12 20 13 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 435786 MLO 2017 12 05 20 16 00 1966-99 S co CCGG 95.830 -999.990 S.. V2 2017 12 20 13 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 435787 MLO 2017 12 12 20 08 00 2548-99 S co CCGG 84.380 -999.990 S.. V2 2017 12 28 09 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 436085 MLO 2017 12 12 20 08 00 4529-99 S co CCGG 85.680 -999.990 S.. V2 2017 12 28 09 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 436086 MLO 2017 12 12 20 21 00 2966-99 P co CCGG 82.230 -999.990 ... V2 2017 12 28 09 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 436083 MLO 2017 12 12 20 21 00 3704-99 P co CCGG 82.780 -999.990 ... V2 2017 12 28 10 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 436084 MLO 2017 12 19 19 59 00 1194-99 S co CCGG 75.010 -999.990 S.. V2 2018 01 11 15 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 436842 MLO 2017 12 19 19 59 00 2752-99 S co CCGG 75.830 -999.990 S.. V2 2018 01 11 15 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 436843 MLO 2017 12 19 20 25 00 1603-99 P co CCGG 75.380 -999.990 ... V2 2018 01 11 14 31 00 19.5362 -155.5763 3402.00 3397.00 5.00 436844 MLO 2017 12 19 20 25 00 2982-99 P co CCGG 75.270 -999.990 ... V2 2018 01 11 14 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 436845 MLO 2017 12 26 20 03 00 2590-99 S co CCGG 89.180 -999.990 S.. V2 2018 01 19 12 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 436854 MLO 2017 12 26 20 03 00 3209-99 S co CCGG 88.530 -999.990 S.. V2 2018 01 19 12 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 436855 MLO 2017 12 26 21 00 00 1930-99 P co CCGG 91.540 -999.990 ... V2 2018 01 19 13 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 436856 MLO 2017 12 26 21 00 00 2097-99 P co CCGG 91.190 -999.990 ... V2 2018 01 19 13 28 00 19.5362 -155.5763 3402.00 3397.00 5.00 436857 MLO 2018 01 02 19 36 00 623-99 P co CCGG 79.420 -999.990 ... V2 2018 01 25 12 18 00 19.5362 -155.5763 3402.00 3397.00 5.00 437342 MLO 2018 01 02 19 36 00 703-99 P co CCGG 93.350 -999.990 A.. V2 2018 01 25 12 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 437343 MLO 2018 01 02 20 04 00 140-99 S co CCGG 73.530 -999.990 A.. V2 2018 01 25 11 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 437340 MLO 2018 01 02 20 04 00 277-99 S co CCGG 80.160 -999.990 A.. V2 2018 01 25 12 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 437341 MLO 2018 01 09 20 02 00 2704-99 S co CCGG 98.540 -999.990 S.. V2 2018 02 07 15 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 437912 MLO 2018 01 09 20 02 00 4428-99 S co CCGG 97.410 -999.990 S.. V2 2018 02 07 16 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 437913 MLO 2018 01 09 20 37 00 4613-99 P co CCGG 97.950 -999.990 ... V2 2018 02 08 10 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 437891 MLO 2018 01 09 20 37 00 714-99 P co CCGG 96.930 -999.990 ... V2 2018 02 08 09 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 437890 MLO 2018 01 16 20 01 00 1539-99 S co CCGG 87.850 -999.990 S.. V2 2018 02 08 15 09 00 19.5362 -155.5763 3437.00 3397.00 40.00 437840 MLO 2018 01 16 20 01 00 2944-99 S co CCGG 87.520 -999.990 S.. V2 2018 02 08 15 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 437841 MLO 2018 01 16 20 26 00 3051-99 P co CCGG 88.350 -999.990 ... V2 2018 02 08 15 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 437838 MLO 2018 01 16 20 26 00 5265-99 P co CCGG 87.970 -999.990 ... V2 2018 02 08 15 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 437839 MLO 2018 01 23 20 02 00 4927-99 S co CCGG 94.150 -999.990 S.. V2 2018 02 13 13 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 438062 MLO 2018 01 23 20 02 00 5334-99 S co CCGG 94.480 -999.990 S.. V2 2018 02 13 13 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 438063 MLO 2018 01 23 21 06 00 3758-99 P co CCGG 93.920 -999.990 ... V2 2018 02 13 13 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 438065 MLO 2018 01 23 21 06 00 4591-99 P co CCGG 93.690 -999.990 ... V2 2018 02 13 14 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 438064 MLO 2018 01 30 20 06 00 2585-99 S co CCGG 104.540 -999.990 S.. V2 2018 02 22 09 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 438630 MLO 2018 01 30 20 06 00 99-99 S co CCGG 104.880 -999.990 S.. V2 2018 02 22 09 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 438629 MLO 2018 01 30 20 41 00 5450-99 P co CCGG 105.900 -999.990 ... V2 2018 02 22 09 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 438627 MLO 2018 01 30 20 41 00 5462-99 P co CCGG 104.510 -999.990 ... V2 2018 02 22 09 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 438628 MLO 2018 02 06 20 14 00 3127-99 S co CCGG 90.280 -999.990 S.. V2 2018 02 28 09 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 438956 MLO 2018 02 06 20 14 00 3200-99 S co CCGG 90.530 -999.990 S.. V2 2018 02 28 09 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 438957 MLO 2018 02 06 21 06 00 1799-99 P co CCGG 90.420 -999.990 ... V2 2018 02 28 10 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 438954 MLO 2018 02 06 21 06 00 2971-99 P co CCGG 90.410 -999.990 ... V2 2018 02 28 10 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 438955 MLO 2018 02 13 19 59 00 3805-99 S co CCGG 78.780 -999.990 S.. V2 2018 03 06 12 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 439549 MLO 2018 02 13 19 59 00 4709-99 S co CCGG 78.590 -999.990 S.. V2 2018 03 06 13 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 439550 MLO 2018 02 13 20 08 00 1945-99 P co CCGG 83.220 -999.990 ... V2 2018 03 06 13 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 439552 MLO 2018 02 13 20 08 00 689-99 P co CCGG 83.300 -999.990 ... V2 2018 03 06 13 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 439551 MLO 2018 02 20 20 03 00 245-99 S co CCGG 98.170 -999.990 S.. V2 2018 03 05 14 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 439501 MLO 2018 02 20 20 03 00 2722-99 S co CCGG 98.070 -999.990 S.. V2 2018 03 05 14 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 439502 MLO 2018 02 20 20 09 00 483-99 P co CCGG 99.530 -999.990 ... V2 2018 03 05 13 43 00 19.5362 -155.5763 3402.00 3397.00 5.00 439503 MLO 2018 02 20 20 09 00 4896-99 P co CCGG 99.090 -999.990 ... V2 2018 03 05 13 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 439504 MLO 2018 02 27 20 01 00 1806-99 S co CCGG 98.390 -999.990 S.. V2 2018 03 13 16 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 439968 MLO 2018 02 27 20 01 00 3707-99 S co CCGG 97.620 -999.990 S.. V2 2018 03 13 16 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 439969 MLO 2018 02 27 20 40 00 2023-99 P co CCGG 98.550 -999.990 ... V2 2018 03 13 16 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 439966 MLO 2018 02 27 20 40 00 5865-99 P co CCGG 97.530 -999.990 ... V2 2018 03 13 17 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 439967 MLO 2018 03 06 20 04 00 1747-99 P co CCGG 102.900 -999.990 ... V2 2018 03 19 11 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 440160 MLO 2018 03 06 20 04 00 971-99 P co CCGG 102.790 -999.990 ... V2 2018 03 19 10 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 440159 MLO 2018 03 06 20 07 00 1629-99 S co CCGG 101.770 -999.990 S.. V2 2018 03 19 10 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 440161 MLO 2018 03 06 20 07 00 22-99 S co CCGG 102.470 -999.990 S.. V2 2018 03 19 10 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 440162 MLO 2018 03 13 20 04 00 1164-99 S co CCGG 82.090 -999.990 S.. V2 2018 03 21 10 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 440410 MLO 2018 03 13 20 04 00 4488-99 S co CCGG 81.630 -999.990 S.. V2 2018 03 21 11 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 440411 MLO 2018 03 13 20 32 00 1374-99 P co CCGG 81.460 -999.990 ... V2 2018 03 21 13 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 440412 MLO 2018 03 13 20 32 00 2419-99 P co CCGG 81.750 -999.990 ... V2 2018 03 21 13 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 440413 MLO 2018 03 20 20 07 00 2238-99 S co CCGG 82.800 -999.990 S.. V2 2018 03 29 15 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 440714 MLO 2018 03 20 20 07 00 361-99 S co CCGG 83.740 -999.990 S.. V2 2018 03 29 15 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 440715 MLO 2018 03 20 20 17 00 1392-99 P co CCGG 87.430 -999.990 ... V2 2018 03 29 14 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 440712 MLO 2018 03 20 20 17 00 5598-99 P co CCGG 86.620 -999.990 ... V2 2018 03 29 14 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 440713 MLO 2018 03 27 20 05 00 2312-99 S co CCGG 127.860 -999.990 S.. V2 2018 04 06 15 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 441098 MLO 2018 03 27 20 05 00 2745-99 S co CCGG 128.990 -999.990 S.. V2 2018 04 06 16 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 441099 MLO 2018 03 29 19 34 00 2524-99 P co CCGG 109.270 -999.990 ... V2 2018 04 06 15 15 00 19.5362 -155.5763 3402.00 3397.00 5.00 441096 MLO 2018 03 29 19 34 00 4713-99 P co CCGG 107.970 -999.990 ... V2 2018 04 06 15 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 441097 MLO 2018 04 03 20 06 00 3967-99 S co CCGG 73.890 -999.990 S.. V2 2018 04 11 15 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 441262 MLO 2018 04 03 20 06 00 5354-99 S co CCGG 75.020 -999.990 S.. V2 2018 04 11 15 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 441261 MLO 2018 04 03 20 26 00 185-99 P co CCGG 78.120 -999.990 ... V2 2018 04 11 15 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 441263 MLO 2018 04 03 20 26 00 472-99 P co CCGG 78.100 -999.990 ... V2 2018 04 11 16 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 441264 MLO 2018 04 10 20 00 00 2264-99 S co CCGG 97.050 -999.990 S.. V2 2018 04 18 15 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 441697 MLO 2018 04 10 20 00 00 4619-99 S co CCGG 95.820 -999.990 S.. V2 2018 04 18 15 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 441698 MLO 2018 04 12 19 27 00 2445-99 P co CCGG 76.910 -999.990 ... V2 2018 04 18 16 37 00 19.5362 -155.5763 3402.00 3397.00 5.00 441695 MLO 2018 04 12 19 27 00 3768-99 P co CCGG 76.460 -999.990 ... V2 2018 04 18 16 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 441696 MLO 2018 04 17 19 47 00 79-99 P co CCGG 85.150 -999.990 ... V2 2018 04 26 09 25 00 19.5362 -155.5763 3402.00 3397.00 5.00 442142 MLO 2018 04 17 19 47 00 838-99 P co CCGG 83.750 -999.990 ... V2 2018 04 26 09 40 00 19.5362 -155.5763 3402.00 3397.00 5.00 442143 MLO 2018 04 17 20 05 00 1296-99 S co CCGG 83.390 -999.990 S.. V2 2018 04 26 11 16 00 19.5362 -155.5763 3437.00 3397.00 40.00 442144 MLO 2018 04 17 20 05 00 241-99 S co CCGG 83.610 -999.990 S.. V2 2018 04 26 11 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 442145 MLO 2018 04 24 19 53 00 5316-99 P co CCGG 108.340 -999.990 ... V2 2018 05 04 12 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 442611 MLO 2018 04 24 19 53 00 703-99 P co CCGG 109.470 -999.990 ... V2 2018 05 04 12 28 00 19.5362 -155.5763 3402.00 3397.00 5.00 442612 MLO 2018 04 24 20 06 00 3737-99 S co CCGG 107.230 -999.990 S.. V2 2018 05 04 12 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 442614 MLO 2018 04 24 20 06 00 623-99 S co CCGG 106.520 -999.990 S.. V2 2018 05 04 11 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 442613 MLO 2018 05 01 19 59 00 1239-99 S co CCGG 66.050 -999.990 S.. V2 2018 05 10 12 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 443016 MLO 2018 05 01 19 59 00 3148-99 S co CCGG 65.690 -999.990 S.. V2 2018 05 10 13 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 443017 MLO 2018 05 01 20 23 00 2188-99 P co CCGG 66.010 -999.990 ... V2 2018 05 10 14 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 443014 MLO 2018 05 01 20 23 00 2205-99 P co CCGG 65.610 -999.990 ... V2 2018 05 10 14 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 443015 MLO 2018 05 08 20 11 00 2975-99 P co CCGG 95.030 -999.990 ... V2 2018 05 23 13 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 443863 MLO 2018 05 08 20 11 00 2976-99 P co CCGG 96.330 -999.990 ... V2 2018 05 23 13 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 443864 MLO 2018 05 08 20 18 00 4549-99 S co CCGG 95.510 -999.990 S.. V2 2018 05 23 15 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 443861 MLO 2018 05 08 20 18 00 4550-99 S co CCGG 95.070 -999.990 S.. V2 2018 05 23 15 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 443862 MLO 2018 05 15 20 03 00 118-99 S co CCGG 99.310 -999.990 S.. V2 2018 05 30 12 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 444037 MLO 2018 05 15 20 03 00 5491-99 S co CCGG 100.200 -999.990 S.. V2 2018 05 30 12 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 444038 MLO 2018 05 15 20 33 00 2909-99 P co CCGG 98.150 -999.990 ... V2 2018 05 30 11 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 444039 MLO 2018 05 15 20 33 00 4266-99 P co CCGG 97.460 -999.990 ... V2 2018 05 30 12 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 444040 MLO 2018 05 22 19 37 00 442-99 P co CCGG 73.360 -999.990 ... V2 2018 06 04 14 56 00 19.5362 -155.5763 3402.00 3397.00 5.00 444476 MLO 2018 05 22 19 37 00 5276-99 P co CCGG 72.210 -999.990 ... V2 2018 06 04 15 12 00 19.5362 -155.5763 3402.00 3397.00 5.00 444477 MLO 2018 05 22 20 02 00 1493-99 S co CCGG 71.120 -999.990 S.. V2 2018 06 04 15 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 444474 MLO 2018 05 22 20 02 00 861-99 S co CCGG 70.250 -999.990 S.. V2 2018 06 04 15 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 444475 MLO 2018 05 31 20 06 00 3045-99 S co CCGG 84.670 -999.990 S.. V2 2018 06 11 10 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 444892 MLO 2018 05 31 20 06 00 5505-99 S co CCGG 83.920 -999.990 S.. V2 2018 06 11 10 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 444893 MLO 2018 05 31 20 35 00 1074-99 P co CCGG 86.440 -999.990 S.. V2 2018 06 11 10 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 444894 MLO 2018 05 31 20 35 00 2604-99 P co CCGG 85.680 -999.990 S.. V2 2018 06 11 11 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 444895 MLO 2018 06 05 19 42 00 2321-99 P co CCGG 73.040 -999.990 ... V2 2018 06 14 09 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 445015 MLO 2018 06 05 19 42 00 4605-99 P co CCGG 72.370 -999.990 ... V2 2018 06 14 09 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 445016 MLO 2018 06 05 20 04 00 1968-99 S co CCGG 69.300 -999.990 S.. V2 2018 06 14 10 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 445017 MLO 2018 06 05 20 04 00 3190-99 S co CCGG 69.850 -999.990 S.. V2 2018 06 14 10 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 445018 MLO 2018 06 19 19 43 00 2502-99 P co CCGG 70.590 -999.990 ... V2 2018 06 28 13 49 00 19.5362 -155.5763 3402.00 3397.00 5.00 445711 MLO 2018 06 19 19 43 00 2952-99 P co CCGG 69.770 -999.990 ... V2 2018 06 28 14 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 445712 MLO 2018 06 19 20 08 00 3366-99 S co CCGG 68.660 -999.990 S.. V2 2018 06 28 13 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 445713 MLO 2018 06 19 20 08 00 4743-99 S co CCGG 68.790 -999.990 S.. V2 2018 06 28 13 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 445714 MLO 2018 06 26 19 40 00 1575-99 P co CCGG 69.820 -999.990 ... V2 2018 07 06 14 38 00 19.5362 -155.5763 3402.00 3397.00 5.00 445942 MLO 2018 06 26 19 40 00 696-99 P co CCGG 69.970 -999.990 ... V2 2018 07 06 14 22 00 19.5362 -155.5763 3402.00 3397.00 5.00 445943 MLO 2018 06 26 20 09 00 3231-99 S co CCGG 71.250 -999.990 S.. V2 2018 07 06 13 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 445944 MLO 2018 06 26 20 09 00 5706-99 S co CCGG 70.980 -999.990 S.. V2 2018 07 06 14 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 445945 MLO 2018 07 03 20 03 00 5085-99 S co CCGG 68.160 -999.990 S.. V2 2018 07 12 13 11 00 19.5362 -155.5763 3437.00 3397.00 40.00 446284 MLO 2018 07 03 20 03 00 831-99 S co CCGG 68.540 -999.990 S.. V2 2018 07 12 12 55 00 19.5362 -155.5763 3437.00 3397.00 40.00 446283 MLO 2018 07 03 20 24 00 1213-99 P co CCGG 70.420 -999.990 ... V2 2018 07 12 12 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 446285 MLO 2018 07 03 20 24 00 2245-99 P co CCGG 69.590 -999.990 ... V2 2018 07 12 12 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 446286 MLO 2018 07 12 19 31 00 2891-99 P co CCGG 64.520 -999.990 ... V2 2018 07 23 10 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 446540 MLO 2018 07 12 19 31 00 327-99 P co CCGG 65.140 -999.990 ... V2 2018 07 23 09 46 00 19.5362 -155.5763 3402.00 3397.00 5.00 446539 MLO 2018 07 12 20 12 00 1529-99 S co CCGG 64.260 -999.990 S.. V2 2018 07 23 10 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 446541 MLO 2018 07 12 20 12 00 4393-99 S co CCGG 63.320 -999.990 S.. V2 2018 07 23 10 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 446542 MLO 2018 07 17 20 09 00 4592-99 S co CCGG 71.590 -999.990 S.. V2 2018 07 24 14 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 446741 MLO 2018 07 17 20 09 00 5862-99 S co CCGG 70.970 -999.990 S.. V2 2018 07 24 14 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 446742 MLO 2018 07 17 20 49 00 2844-99 P co CCGG 73.560 -999.990 N.. V2 2018 07 24 14 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 446743 MLO 2018 07 17 20 49 00 3331-99 P co CCGG 69.370 -999.990 N.. V2 2018 07 24 15 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 446744 MLO 2018 07 24 20 05 00 3058-99 S co CCGG 57.540 -999.990 S.. V2 2018 08 06 11 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 446962 MLO 2018 07 24 20 05 00 4873-99 S co CCGG 57.530 -999.990 S.. V2 2018 08 06 11 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 446963 MLO 2018 07 24 21 03 00 4802-99 P co CCGG 60.160 -999.990 ... V2 2018 08 06 10 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 446964 MLO 2018 07 24 21 03 00 5779-99 P co CCGG 59.980 -999.990 ... V2 2018 08 06 11 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 446965 MLO 2018 08 02 19 09 00 2681-99 S co CCGG 61.530 -999.990 S.. V2 2018 08 14 11 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 447462 MLO 2018 08 02 19 09 00 2901-99 S co CCGG 61.380 -999.990 S.. V2 2018 08 14 11 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 447463 MLO 2018 08 02 19 29 00 325-99 P co CCGG 63.440 -999.990 ... V2 2018 08 14 11 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 447464 MLO 2018 08 02 19 29 00 3906-99 P co CCGG 62.920 -999.990 ... V2 2018 08 14 11 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 447465 MLO 2018 08 07 19 57 00 1076-99 S co CCGG 71.470 -999.990 S.. V2 2018 08 22 15 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 448056 MLO 2018 08 07 19 57 00 1737-99 S co CCGG 69.860 -999.990 S.. V2 2018 08 22 16 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 448057 MLO 2018 08 07 20 26 00 1603-99 P co CCGG 73.620 -999.990 ... V2 2018 08 22 15 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 448054 MLO 2018 08 07 20 26 00 3218-99 P co CCGG 73.110 -999.990 ... V2 2018 08 22 15 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 448055 MLO 2018 08 14 19 40 00 2957-99 P co CCGG 79.090 -999.990 ... V2 2018 08 28 11 41 00 19.5362 -155.5763 3402.00 3397.00 5.00 448163 MLO 2018 08 14 19 40 00 5033-99 P co CCGG 79.170 -999.990 ... V2 2018 08 28 11 56 00 19.5362 -155.5763 3402.00 3397.00 5.00 448164 MLO 2018 08 14 20 14 00 3470-99 S co CCGG 78.490 -999.990 S.. V2 2018 08 28 12 28 00 19.5362 -155.5763 3437.00 3397.00 40.00 448162 MLO 2018 08 14 20 14 00 407-99 S co CCGG 77.930 -999.990 S.. V2 2018 08 28 12 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 448161 MLO 2018 08 21 20 20 00 2325-99 S co CCGG 61.110 -999.990 S.. V2 2018 09 04 11 47 00 19.5362 -155.5763 3437.00 3397.00 40.00 448466 MLO 2018 08 21 20 20 00 692-99 S co CCGG 60.060 -999.990 S.. V2 2018 09 04 11 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 448465 MLO 2018 08 21 20 51 00 647-99 P co CCGG 61.940 -999.990 ... V2 2018 09 04 10 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 448463 MLO 2018 08 21 20 51 00 818-99 P co CCGG 61.310 -999.990 ... V2 2018 09 04 11 15 00 19.5362 -155.5763 3402.00 3397.00 5.00 448464 MLO 2018 08 28 20 02 00 2415-99 S co CCGG 63.940 -999.990 ... V2 2018 09 11 14 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 448840 MLO 2018 08 28 20 02 00 5723-99 S co CCGG 68.680 -999.990 N.. V2 2018 09 11 14 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 448841 MLO 2018 08 28 20 27 00 967-99 P co CCGG 64.860 -999.990 ... V2 2018 09 11 14 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 448842 MLO 2018 08 28 20 27 00 992-99 P co CCGG 65.170 -999.990 ... V2 2018 09 11 14 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 448843 MLO 2018 09 04 20 05 00 4016-99 S co CCGG 65.940 -999.990 S.. V2 2018 09 17 17 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 448953 MLO 2018 09 04 20 05 00 5444-99 S co CCGG 66.420 -999.990 S.. V2 2018 09 17 17 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 448954 MLO 2018 09 04 20 50 00 3980-99 P co CCGG 67.410 -999.990 ... V2 2018 09 17 16 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 448951 MLO 2018 09 04 20 50 00 4737-99 P co CCGG 66.020 -999.990 ... V2 2018 09 17 16 45 00 19.5362 -155.5763 3402.00 3397.00 5.00 448952 MLO 2018 09 11 20 09 00 3143-99 S co CCGG 70.110 -999.990 S.. V2 2018 09 20 13 51 00 19.5362 -155.5763 3437.00 3397.00 40.00 449226 MLO 2018 09 11 20 09 00 3622-99 S co CCGG 69.370 -999.990 S.. V2 2018 09 20 14 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 449227 MLO 2018 09 11 20 34 00 264-99 P co CCGG 70.290 -999.990 ... V2 2018 09 20 13 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 449228 MLO 2018 09 11 20 34 00 806-99 P co CCGG 70.090 -999.990 ... V2 2018 09 20 13 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 449229 MLO 2018 09 18 20 02 00 2827-99 P co CCGG 82.450 -999.990 ... V2 2018 09 28 13 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 449640 MLO 2018 09 18 20 02 00 5336-99 P co CCGG 81.390 -999.990 ... V2 2018 09 28 13 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 449641 MLO 2018 09 18 21 01 00 1137-99 S co CCGG 85.790 -999.990 S.. V2 2018 09 28 12 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 449642 MLO 2018 09 18 21 01 00 1206-99 S co CCGG 85.350 -999.990 S.. V2 2018 09 28 13 05 00 19.5362 -155.5763 3437.00 3397.00 40.00 449643 MLO 2018 09 25 19 59 00 1049-99 P co CCGG 66.430 -999.990 ... V2 2018 10 02 13 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 449732 MLO 2018 09 25 19 59 00 1336-99 P co CCGG 66.170 -999.990 ... V2 2018 10 02 13 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 449733 MLO 2018 09 25 20 06 00 2589-99 S co CCGG 65.870 -999.990 S.. V2 2018 10 02 12 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 449730 MLO 2018 09 25 20 06 00 4849-99 S co CCGG 66.790 -999.990 S.. V2 2018 10 02 13 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 449731 MLO 2018 10 02 20 03 00 2304-99 S co CCGG 59.040 -999.990 S.. V2 2018 10 10 14 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 449998 MLO 2018 10 02 20 03 00 286-99 S co CCGG 59.390 -999.990 S.. V2 2018 10 10 14 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 449999 MLO 2018 10 02 20 32 00 4472-99 P co CCGG 60.240 -999.990 ... V2 2018 10 15 12 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 450029 MLO 2018 10 02 20 32 00 849-99 P co CCGG 61.800 -999.990 ... V2 2018 10 15 12 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 450028 MLO 2018 10 09 20 03 00 4098-99 S co CCGG 82.750 -999.990 S.. V2 2018 10 19 10 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 450392 MLO 2018 10 09 20 03 00 4979-99 S co CCGG 81.940 -999.990 S.. V2 2018 10 19 10 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 450391 MLO 2018 10 09 20 31 00 1819-99 P co CCGG 85.150 -999.990 ... V2 2018 10 19 10 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 450393 MLO 2018 10 09 20 31 00 4410-99 P co CCGG 83.900 -999.990 ... V2 2018 10 19 10 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 450394 MLO 2018 10 16 19 49 00 4992-99 P co CCGG 78.560 -999.990 ... V2 2018 10 29 13 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 450710 MLO 2018 10 16 19 49 00 5083-99 P co CCGG 79.330 -999.990 ... V2 2018 10 29 13 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 450711 MLO 2018 10 16 20 06 00 2565-99 S co CCGG 76.390 -999.990 S.. V2 2018 10 29 12 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 450708 MLO 2018 10 16 20 06 00 3728-99 S co CCGG 77.200 -999.990 S.. V2 2018 10 29 13 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 450709 MLO 2018 10 23 20 04 00 1887-99 S co CCGG 81.020 -999.990 S.. V2 2018 11 01 12 07 00 19.5362 -155.5763 3437.00 3397.00 40.00 450839 MLO 2018 10 23 20 04 00 5209-99 S co CCGG 80.430 -999.990 S.. V2 2018 11 01 12 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 450838 MLO 2018 10 23 20 30 00 1256-99 P co CCGG 81.150 -999.990 ... V2 2018 11 01 12 39 00 19.5362 -155.5763 3402.00 3397.00 5.00 450836 MLO 2018 10 23 20 30 00 1553-99 P co CCGG 80.640 -999.990 ... V2 2018 11 01 12 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 450837 MLO 2018 10 30 20 02 00 2407-99 S co CCGG 70.910 -999.990 S.. V2 2018 11 07 14 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 451116 MLO 2018 10 30 20 02 00 523-99 S co CCGG 70.300 -999.990 S.. V2 2018 11 07 14 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 451115 MLO 2018 10 30 20 37 00 1911-99 P co CCGG 71.570 -999.990 ... V2 2018 11 07 13 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 451117 MLO 2018 10 30 20 37 00 4064-99 P co CCGG 71.320 -999.990 ... V2 2018 11 07 13 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 451118 MLO 2018 11 06 19 44 00 2451-99 P co CCGG 78.140 -999.990 ... V2 2018 11 26 13 56 00 19.5362 -155.5763 3402.00 3397.00 5.00 451645 MLO 2018 11 06 19 44 00 5703-99 P co CCGG 77.570 -999.990 ... V2 2018 11 26 14 12 00 19.5362 -155.5763 3402.00 3397.00 5.00 451646 MLO 2018 11 06 20 11 00 5071-99 S co CCGG 76.570 -999.990 S.. V2 2018 11 26 13 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 451643 MLO 2018 11 06 20 11 00 5512-99 S co CCGG 76.430 -999.990 S.. V2 2018 11 26 13 40 00 19.5362 -155.5763 3437.00 3397.00 40.00 451644 MLO 2018 11 15 20 02 00 5295-99 S co CCGG 108.640 -999.990 S.. V2 2018 11 28 12 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 451742 MLO 2018 11 15 20 02 00 5306-99 S co CCGG 108.730 -999.990 S.. V2 2018 11 28 12 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 451743 MLO 2018 11 15 20 24 00 1550-99 P co CCGG 104.980 -999.990 ... V2 2018 11 28 13 36 00 19.5362 -155.5763 3402.00 3397.00 5.00 451740 MLO 2018 11 15 20 24 00 5127-99 P co CCGG 104.150 -999.990 ... V2 2018 11 28 13 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 451741 MLO 2018 11 20 20 07 00 1244-99 S co CCGG 86.850 -999.990 S.. V2 2018 12 06 14 21 00 19.5362 -155.5763 3437.00 3397.00 40.00 452050 MLO 2018 11 20 20 07 00 2130-99 S co CCGG 87.390 -999.990 S.. V2 2018 12 06 14 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 452051 MLO 2018 11 20 20 30 00 3688-99 P co CCGG 88.230 -999.990 ... V2 2018 12 06 13 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 452048 MLO 2018 11 20 20 30 00 5242-99 P co CCGG 87.900 -999.990 ... V2 2018 12 06 13 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 452049 MLO 2018 11 27 20 10 00 1346-99 S co CCGG 86.710 -999.990 S.. V2 2018 12 18 11 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 452634 MLO 2018 11 27 20 10 00 2999-99 S co CCGG 86.980 -999.990 S.. V2 2018 12 18 11 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 452635 MLO 2018 11 27 20 48 00 2739-99 P co CCGG 91.840 -999.990 ... V2 2018 12 18 11 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 452632 MLO 2018 11 27 20 48 00 3179-99 P co CCGG 92.120 -999.990 ... V2 2018 12 18 11 22 00 19.5362 -155.5763 3402.00 3397.00 5.00 452633 MLO 2018 12 04 19 58 00 136-99 S co CCGG 85.450 -999.990 S.. V2 2019 01 14 14 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 452860 MLO 2018 12 04 19 58 00 2957-99 S co CCGG 84.780 -999.990 S.. V2 2019 01 14 15 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 452861 MLO 2018 12 04 20 25 00 1247-99 P co CCGG 87.270 -999.990 ... V2 2019 01 14 15 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 452858 MLO 2018 12 04 20 25 00 3636-99 P co CCGG 86.600 -999.990 ... V2 2019 01 14 15 35 00 19.5362 -155.5763 3437.00 3397.00 40.00 452859 MLO 2018 12 11 20 02 00 2944-99 S co CCGG 101.460 -999.990 S.. V2 2019 01 16 13 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 453024 MLO 2018 12 11 20 02 00 687-99 S co CCGG 101.380 -999.990 S.. V2 2019 01 16 13 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 453023 MLO 2018 12 11 20 27 00 1003-99 P co CCGG 104.210 -999.990 ... V2 2019 01 16 12 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 453025 MLO 2018 12 11 20 27 00 3786-99 P co CCGG 102.340 -999.990 ... V2 2019 01 16 13 02 00 19.5362 -155.5763 3437.00 3397.00 40.00 453026 MLO 2018 12 18 20 04 00 1952-99 S co CCGG 84.900 -999.990 S.. V2 2019 01 22 17 23 00 19.5362 -155.5763 3437.00 3397.00 40.00 453277 MLO 2018 12 18 20 04 00 4418-99 S co CCGG 84.460 -999.990 S.. V2 2019 01 22 17 39 00 19.5362 -155.5763 3437.00 3397.00 40.00 453278 MLO 2018 12 18 20 38 00 4162-99 P co CCGG 86.450 -999.990 ... V2 2019 01 23 09 57 00 19.5362 -155.5763 3402.00 3397.00 5.00 453275 MLO 2018 12 18 20 38 00 5241-99 P co CCGG 85.000 -999.990 ... V2 2019 01 23 10 13 00 19.5362 -155.5763 3402.00 3397.00 5.00 453276 MLO 2018 12 27 20 15 00 2740-99 S co CCGG 77.950 -999.990 S.. V2 2019 01 22 15 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 453289 MLO 2018 12 27 20 15 00 4689-99 S co CCGG 77.600 -999.990 S.. V2 2019 01 22 15 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 453290 MLO 2018 12 27 20 37 00 4967-99 P co CCGG 79.010 -999.990 ... V2 2019 01 22 16 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 453293 MLO 2018 12 27 20 37 00 649-99 P co CCGG 79.290 -999.990 ... V2 2019 01 22 15 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 453294 MLO 2019 01 03 20 01 00 3109-99 S co CCGG 88.130 -999.990 S.. V2 2019 01 22 14 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 453287 MLO 2019 01 03 20 01 00 5375-99 S co CCGG 87.370 -999.990 S.. V2 2019 01 22 15 01 00 19.5362 -155.5763 3437.00 3397.00 40.00 453288 MLO 2019 01 03 20 30 00 3110-99 P co CCGG 89.340 -999.990 ... V2 2019 01 22 14 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 453291 MLO 2019 01 03 20 30 00 4011-99 P co CCGG 89.020 -999.990 ... V2 2019 01 22 14 29 00 19.5362 -155.5763 3402.00 3397.00 5.00 453292 MLO 2019 01 08 20 01 00 2973-99 S co CCGG 100.800 -999.990 S.. V2 2019 01 30 17 06 00 19.5362 -155.5763 3437.00 3397.00 40.00 453520 MLO 2019 01 08 20 01 00 3935-99 S co CCGG 101.230 -999.990 S.. V2 2019 01 30 17 22 00 19.5362 -155.5763 3437.00 3397.00 40.00 453521 MLO 2019 01 08 20 27 00 3306-99 P co CCGG 104.180 -999.990 ... V2 2019 01 30 16 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 453523 MLO 2019 01 08 20 27 00 945-99 P co CCGG 105.850 -999.990 ... V2 2019 01 30 16 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 453522 MLO 2019 01 15 20 07 00 2353-99 S co CCGG 87.080 -999.990 S.. V2 2019 02 07 18 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 453935 MLO 2019 01 15 20 07 00 573-99 S co CCGG 87.020 -999.990 S.. V2 2019 02 07 18 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 453936 MLO 2019 01 15 20 27 00 2533-99 P co CCGG 98.460 -999.990 ... V2 2019 02 07 17 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 453938 MLO 2019 01 15 20 27 00 707-99 P co CCGG 96.800 -999.990 ... V2 2019 02 07 17 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 453937 MLO 2019 01 22 20 08 00 4831-99 S co CCGG 143.480 -999.990 S.. V2 2019 02 12 11 25 00 19.5362 -155.5763 3437.00 3397.00 40.00 454006 MLO 2019 01 22 20 08 00 5161-99 S co CCGG 144.350 -999.990 S.. V2 2019 02 12 11 41 00 19.5362 -155.5763 3437.00 3397.00 40.00 454007 MLO 2019 01 22 20 32 00 1141-99 P co CCGG 144.590 -999.990 .X. V2 2019 02 12 10 53 00 19.5362 -155.5763 3402.00 3397.00 5.00 454004 MLO 2019 01 22 20 32 00 2783-99 P co CCGG 142.890 -999.990 .X. V2 2019 02 12 11 09 00 19.5362 -155.5763 3402.00 3397.00 5.00 454005 MLO 2019 01 29 20 05 00 3620-99 S co CCGG 102.060 -999.990 S.. V2 2019 02 19 12 32 00 19.5362 -155.5763 3437.00 3397.00 40.00 454439 MLO 2019 01 29 20 05 00 3939-99 S co CCGG 103.000 -999.990 S.. V2 2019 02 19 12 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 454440 MLO 2019 01 29 20 31 00 1819-99 P co CCGG 107.940 -999.990 ... V2 2019 02 15 17 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 454369 MLO 2019 01 29 20 31 00 2394-99 P co CCGG 107.430 -999.990 ... V2 2019 02 15 18 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 454370 MLO 2019 02 05 20 20 00 1049-99 S co CCGG 121.170 -999.990 S.. V2 2019 02 26 13 12 00 19.5362 -155.5763 3437.00 3397.00 40.00 454444 MLO 2019 02 05 20 20 00 276-99 S co CCGG 119.900 -999.990 S.. V2 2019 02 26 12 56 00 19.5362 -155.5763 3437.00 3397.00 40.00 454443 MLO 2019 02 05 20 44 00 4224-99 P co CCGG 122.130 -999.990 ... V2 2019 02 26 12 40 00 19.5362 -155.5763 3402.00 3397.00 5.00 454442 MLO 2019 02 05 20 44 00 605-99 P co CCGG 122.000 -999.990 ... V2 2019 02 26 12 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 454441 MLO 2019 02 12 20 08 00 3231-99 P co CCGG 116.380 -999.990 ... V2 2019 02 28 17 02 00 19.5362 -155.5763 3402.00 3397.00 5.00 454919 MLO 2019 02 12 20 08 00 92-99 P co CCGG 115.870 -999.990 ... V2 2019 02 28 16 47 00 19.5362 -155.5763 3402.00 3397.00 5.00 454918 MLO 2019 02 12 20 14 00 766-99 S co CCGG 118.220 -999.990 S.. V2 2019 02 28 17 18 00 19.5362 -155.5763 3437.00 3397.00 40.00 454916 MLO 2019 02 12 20 14 00 916-99 S co CCGG 115.620 -999.990 S.. V2 2019 02 28 17 34 00 19.5362 -155.5763 3437.00 3397.00 40.00 454917 MLO 2019 02 19 20 00 00 3282-99 S co CCGG 81.310 -999.990 S.. V2 2019 03 11 10 24 00 19.5362 -155.5763 3437.00 3397.00 40.00 455534 MLO 2019 02 19 20 00 00 626-99 S co CCGG 82.710 -999.990 S.. V2 2019 03 11 10 08 00 19.5362 -155.5763 3437.00 3397.00 40.00 455533 MLO 2019 02 21 19 51 00 3209-99 P co CCGG 96.290 -999.990 ... V2 2019 03 11 10 40 00 19.5362 -155.5763 3402.00 3397.00 5.00 455535 MLO 2019 02 21 19 51 00 3267-99 P co CCGG 96.580 -999.990 ... V2 2019 03 11 10 56 00 19.5362 -155.5763 3402.00 3397.00 5.00 455536 MLO 2019 02 26 20 04 00 1745-99 S co CCGG 116.240 -999.990 S.. V2 2019 03 12 13 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 455567 MLO 2019 02 26 20 04 00 4721-99 S co CCGG 113.560 -999.990 S.. V2 2019 03 12 13 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 455568 MLO 2019 02 26 20 30 00 3612-99 P co CCGG 184.420 -999.990 A.. V2 2019 03 12 12 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 455569 MLO 2019 02 26 20 30 00 3612-99 P co CCGG 115.460 -999.990 ... V2 2019 03 12 13 52 00 19.5362 -155.5763 3402.00 3397.00 5.00 455569 MLO 2019 02 26 20 30 00 5505-99 P co CCGG 113.910 -999.990 ... V2 2019 03 12 12 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 455570 MLO 2019 03 08 20 18 00 3340-99 S co CCGG 105.310 -999.990 S.. V2 2019 03 21 10 37 00 19.5362 -155.5763 3437.00 3397.00 40.00 455904 MLO 2019 03 08 20 18 00 4687-99 S co CCGG 105.230 -999.990 S.. V2 2019 03 21 10 53 00 19.5362 -155.5763 3437.00 3397.00 40.00 455905 MLO 2019 03 08 20 25 00 1855-99 P co CCGG 106.700 -999.990 ... V2 2019 03 20 13 34 00 19.5362 -155.5763 3402.00 3397.00 5.00 455883 MLO 2019 03 08 20 25 00 643-99 P co CCGG 106.230 -999.990 ... V2 2019 03 20 13 19 00 19.5362 -155.5763 3402.00 3397.00 5.00 455882 MLO 2019 03 12 20 17 00 3045-99 S co CCGG 113.930 -999.990 S.. V2 2019 03 22 11 42 00 19.5362 -155.5763 3437.00 3397.00 40.00 456019 MLO 2019 03 12 20 17 00 4843-99 S co CCGG 113.030 -999.990 S.. V2 2019 03 22 11 58 00 19.5362 -155.5763 3437.00 3397.00 40.00 456020 MLO 2019 03 12 20 55 00 4199-99 P co CCGG 126.110 -999.990 ... V2 2019 03 22 12 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 456021 MLO 2019 03 12 20 55 00 4895-99 P co CCGG 125.140 -999.990 ... V2 2019 03 22 12 30 00 19.5362 -155.5763 3402.00 3397.00 5.00 456022 MLO 2019 03 19 20 01 00 59-99 S co CCGG 121.520 -999.990 S.. V2 2019 04 10 10 48 00 19.5362 -155.5763 3437.00 3397.00 40.00 456643 MLO 2019 03 19 20 01 00 60-99 S co CCGG 123.670 -999.990 S.. V2 2019 04 10 11 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 456644 MLO 2019 03 19 20 25 00 3719-99 P co CCGG 125.230 -999.990 ... V2 2019 04 10 10 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 456645 MLO 2019 03 19 20 25 00 3720-99 P co CCGG 124.800 -999.990 ... V2 2019 04 10 10 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 456646 MLO 2019 03 26 19 59 00 851-99 P co CCGG 86.790 -999.990 ... V2 2019 04 04 16 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 456466 MLO 2019 03 26 19 59 00 852-99 P co CCGG 86.460 -999.990 ... V2 2019 04 04 16 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 456467 MLO 2019 03 26 20 05 00 749-99 S co CCGG 87.720 -999.990 S.. V2 2019 04 04 16 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 456468 MLO 2019 03 26 20 05 00 750-99 S co CCGG 86.940 -999.990 S.. V2 2019 04 04 16 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 456469 MLO 2019 04 04 20 06 00 2749-99 S co CCGG 103.620 -999.990 S.. V2 2019 04 16 13 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 456797 MLO 2019 04 04 20 06 00 362-99 S co CCGG 104.540 -999.990 S.. V2 2019 04 16 12 44 00 19.5362 -155.5763 3437.00 3397.00 40.00 456796 MLO 2019 04 04 20 26 00 1307-99 P co CCGG 98.270 -999.990 ... V2 2019 04 16 13 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 456798 MLO 2019 04 04 20 26 00 5172-99 P co CCGG 99.190 -999.990 ... V2 2019 04 16 13 32 00 19.5362 -155.5763 3402.00 3397.00 5.00 456799 MLO 2019 04 09 18 18 00 2834-99 S co CCGG 89.680 -999.990 S.. V2 2019 04 29 15 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 457161 MLO 2019 04 09 18 18 00 409-99 S co CCGG 90.730 -999.990 S.. V2 2019 04 29 15 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 457160 MLO 2019 04 09 18 50 00 1947-99 P co CCGG 95.120 -999.990 ... V2 2019 04 29 16 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 457162 MLO 2019 04 09 18 50 00 2307-99 P co CCGG 94.060 -999.990 ... V2 2019 04 29 16 21 00 19.5362 -155.5763 3402.00 3397.00 5.00 457163 MLO 2019 04 16 20 05 00 3298-99 S co CCGG 100.070 -999.990 S.. V2 2019 05 13 14 03 00 19.5362 -155.5763 3437.00 3397.00 40.00 458309 MLO 2019 04 16 20 05 00 4006-99 S co CCGG 100.890 -999.990 S.. V2 2019 05 13 14 19 00 19.5362 -155.5763 3437.00 3397.00 40.00 458310 MLO 2019 04 16 20 35 00 1771-99 P co CCGG 103.150 -999.990 ... V2 2019 05 13 14 51 00 19.5362 -155.5763 3402.00 3397.00 5.00 458311 MLO 2019 04 16 20 35 00 361-99 P co CCGG 104.100 -999.990 ... V2 2019 05 13 14 35 00 19.5362 -155.5763 3402.00 3397.00 5.00 458312 MLO 2019 04 22 20 15 00 3024-99 S co CCGG 117.180 -999.990 S.. V2 2019 05 13 15 38 00 19.5362 -155.5763 3437.00 3397.00 40.00 458316 MLO 2019 04 22 20 15 00 3594-99 S co CCGG 116.760 -999.990 S.. V2 2019 05 13 15 54 00 19.5362 -155.5763 3437.00 3397.00 40.00 458315 MLO 2019 04 22 20 40 00 2535-99 P co CCGG 116.280 -999.990 ... V2 2019 05 13 15 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 458313 MLO 2019 04 22 20 40 00 3563-99 P co CCGG 116.390 -999.990 ... V2 2019 05 13 15 22 00 19.5362 -155.5763 3402.00 3397.00 5.00 458314 MLO 2019 04 30 20 02 00 1457-99 S co CCGG 101.200 -999.990 S.. V2 2019 05 20 14 04 00 19.5362 -155.5763 3437.00 3397.00 40.00 458704 MLO 2019 04 30 20 02 00 861-99 S co CCGG 103.120 -999.990 S.. V2 2019 05 20 13 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 458703 MLO 2019 04 30 20 25 00 1691-99 P co CCGG 103.670 -999.990 ... V2 2019 05 20 13 17 00 19.5362 -155.5763 3402.00 3397.00 5.00 458702 MLO 2019 04 30 20 25 00 2281-99 P co CCGG 102.950 -999.990 ... V2 2019 05 20 13 33 00 19.5362 -155.5763 3402.00 3397.00 5.00 458701 MLO 2019 05 07 19 45 00 2370-99 P co CCGG 99.020 -999.990 ... V2 2019 05 28 13 28 00 19.5362 -155.5763 3402.00 3397.00 5.00 458723 MLO 2019 05 07 19 45 00 4713-99 P co CCGG 99.660 -999.990 ... V2 2019 05 28 13 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 458724 MLO 2019 05 07 20 10 00 1582-99 S co CCGG 99.340 -999.990 S.. V2 2019 05 28 12 57 00 19.5362 -155.5763 3437.00 3397.00 40.00 458725 MLO 2019 05 07 20 10 00 2524-99 S co CCGG 99.970 -999.990 S.. V2 2019 05 28 13 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 458726 MLO 2019 05 14 20 05 00 4682-99 S co CCGG 102.420 -999.990 S.. V2 2019 05 31 15 10 00 19.5362 -155.5763 3437.00 3397.00 40.00 459224 MLO 2019 05 14 20 05 00 5462-99 S co CCGG 101.780 -999.990 S.. V2 2019 05 31 15 26 00 19.5362 -155.5763 3437.00 3397.00 40.00 459225 MLO 2019 05 14 20 32 00 2762-99 P co CCGG 101.080 -999.990 ... V2 2019 06 03 10 58 00 19.5362 -155.5763 3402.00 3397.00 5.00 459226 MLO 2019 05 14 20 32 00 3612-99 P co CCGG 101.470 -999.990 ... V2 2019 06 03 11 14 00 19.5362 -155.5763 3402.00 3397.00 5.00 459227 MLO 2019 05 24 20 08 00 1468-99 P co CCGG 102.770 -999.990 ... V2 2019 06 27 15 08 00 19.5362 -155.5763 3402.00 3397.00 5.00 460166 MLO 2019 05 24 20 08 00 1946-99 P co CCGG 101.750 -999.990 ... V2 2019 06 27 15 24 00 19.5362 -155.5763 3402.00 3397.00 5.00 460167 MLO 2019 05 24 20 17 00 1068-99 S co CCGG 100.140 -999.990 S.. V2 2019 06 27 14 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 460168 MLO 2019 05 24 20 17 00 5433-99 S co CCGG 99.110 -999.990 S.. V2 2019 06 27 14 52 00 19.5362 -155.5763 3437.00 3397.00 40.00 460169 MLO 2019 05 28 19 54 00 906-99 P co CCGG 96.840 -999.990 ... V2 2019 06 27 14 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 460170 MLO 2019 05 28 19 54 00 944-99 P co CCGG 95.780 -999.990 ... V2 2019 06 27 14 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 460171 MLO 2019 05 28 20 03 00 4100-99 S co CCGG 94.340 -999.990 S.. V2 2019 06 27 13 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 460173 MLO 2019 05 28 20 03 00 430-99 S co CCGG 94.460 -999.990 S.. V2 2019 06 27 13 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 460172 MLO 2019 06 06 19 51 00 1032-99 P co CCGG 84.200 -999.990 ... V2 2019 06 27 11 26 00 19.5362 -155.5763 3402.00 3397.00 5.00 460190 MLO 2019 06 06 19 51 00 2557-99 P co CCGG 84.590 -999.990 ... V2 2019 06 27 11 42 00 19.5362 -155.5763 3402.00 3397.00 5.00 460191 MLO 2019 06 06 20 15 00 469-99 S co CCGG 82.770 -999.990 S.. V2 2019 06 27 11 58 00 19.5362 -155.5763 3437.00 3397.00 40.00 460192 MLO 2019 06 06 20 15 00 5599-99 S co CCGG 82.240 -999.990 S.. V2 2019 06 27 12 13 00 19.5362 -155.5763 3437.00 3397.00 40.00 460193 MLO 2019 06 11 19 54 00 3227-99 P co CCGG 79.980 -999.990 ... V2 2019 06 27 13 01 00 19.5362 -155.5763 3402.00 3397.00 5.00 460186 MLO 2019 06 11 19 54 00 3331-99 P co CCGG 79.050 -999.990 ... V2 2019 06 27 13 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 460187 MLO 2019 06 11 20 16 00 1076-99 S co CCGG 77.520 -999.990 S.. V2 2019 06 27 12 45 00 19.5362 -155.5763 3437.00 3397.00 40.00 460189 MLO 2019 06 11 20 16 00 737-99 S co CCGG 77.080 -999.990 S.. V2 2019 06 27 12 29 00 19.5362 -155.5763 3437.00 3397.00 40.00 460188 MLO 2019 06 18 19 51 00 1070-99 S co CCGG 80.950 -999.990 S.. V2 2019 07 02 12 33 00 19.5362 -155.5763 3437.00 3397.00 40.00 460542 MLO 2019 06 18 19 51 00 1594-99 S co CCGG 80.690 -999.990 S.. V2 2019 07 02 12 49 00 19.5362 -155.5763 3437.00 3397.00 40.00 460543 MLO 2019 06 18 20 15 00 1636-99 P co CCGG 84.530 -999.990 ... V2 2019 07 02 13 05 00 19.5362 -155.5763 3402.00 3397.00 5.00 460540 MLO 2019 06 18 20 15 00 5060-99 P co CCGG 83.650 -999.990 ... V2 2019 07 02 13 20 00 19.5362 -155.5763 3402.00 3397.00 5.00 460541 MLO 2019 06 25 20 05 00 377-99 P co CCGG 74.270 -999.990 ... V2 2019 07 11 14 28 00 19.5362 -155.5763 3402.00 3397.00 5.00 461102 MLO 2019 06 25 20 05 00 377-99 P co CCGG 79.660 -999.990 ... V2 2019 07 12 09 54 00 19.5362 -155.5763 3402.00 3397.00 5.00 461102 MLO 2019 06 25 20 05 00 5596-99 P co CCGG 72.500 -999.990 ... V2 2019 07 11 14 44 00 19.5362 -155.5763 3402.00 3397.00 5.00 461103 MLO 2019 06 25 20 05 00 5596-99 P co CCGG 78.270 -999.990 ... V2 2019 07 12 10 10 00 19.5362 -155.5763 3402.00 3397.00 5.00 461103 MLO 2019 06 25 20 40 00 2064-99 S co CCGG 71.830 -999.990 S.. V2 2019 07 11 15 00 00 19.5362 -155.5763 3437.00 3397.00 40.00 461100 MLO 2019 06 25 20 40 00 2064-99 S co CCGG 75.210 -999.990 S.. V2 2019 07 11 16 31 00 19.5362 -155.5763 3437.00 3397.00 40.00 461100 MLO 2019 06 25 20 40 00 2881-99 S co CCGG 71.620 -999.990 S.. V2 2019 07 11 15 15 00 19.5362 -155.5763 3437.00 3397.00 40.00 461101 MLO 2019 06 25 20 40 00 2881-99 S co CCGG 73.930 -999.990 S.. V2 2019 07 11 16 46 00 19.5362 -155.5763 3437.00 3397.00 40.00 461101 MLO 2019 07 02 19 50 00 4218-99 S co CCGG 67.720 -999.990 S.. V2 2019 07 26 13 36 00 19.5362 -155.5763 3437.00 3397.00 40.00 461613 MLO 2019 07 02 19 50 00 945-99 S co CCGG 68.400 -999.990 S.. V2 2019 07 26 13 20 00 19.5362 -155.5763 3437.00 3397.00 40.00 461612 MLO 2019 07 02 20 15 00 1794-99 P co CCGG 71.120 -999.990 ... V2 2019 07 26 12 48 00 19.5362 -155.5763 3402.00 3397.00 5.00 461614 MLO 2019 07 02 20 15 00 3733-99 P co CCGG 69.920 -999.990 ... V2 2019 07 26 13 04 00 19.5362 -155.5763 3402.00 3397.00 5.00 461615 MLO 2019 07 09 19 53 00 1176-99 S co CCGG 69.600 -999.990 S.. V2 2019 08 01 12 27 00 19.5362 -155.5763 3437.00 3397.00 40.00 461908 MLO 2019 07 09 19 53 00 4153-99 S co CCGG 69.540 -999.990 S.. V2 2019 08 01 12 43 00 19.5362 -155.5763 3437.00 3397.00 40.00 461909 MLO 2019 07 09 20 01 00 355-99 P co CCGG 70.720 -999.990 ... V2 2019 08 01 11 55 00 19.5362 -155.5763 3402.00 3397.00 5.00 461906 MLO 2019 07 09 20 01 00 4236-99 P co CCGG 70.460 -999.990 ... V2 2019 08 01 12 11 00 19.5362 -155.5763 3402.00 3397.00 5.00 461907 MLO 2019 07 18 19 38 00 334-99 P co CCGG 66.570 -999.990 ... AR2 2019 08 13 12 41 22 19.5362 -155.5763 3402.00 3397.00 5.00 462951 MLO 2019 07 18 19 38 00 356-99 P co CCGG 66.400 -999.990 ... AR2 2019 08 13 12 55 40 19.5362 -155.5763 3402.00 3397.00 5.00 462952 MLO 2019 07 18 19 41 00 1048-99 S co CCGG 65.950 -999.990 S.. AR2 2019 08 13 13 24 16 19.5362 -155.5763 3437.00 3397.00 40.00 462950 MLO 2019 07 18 19 41 00 862-99 S co CCGG 65.200 -999.990 S.. AR2 2019 08 13 13 09 58 19.5362 -155.5763 3437.00 3397.00 40.00 462949 MLO 2019 07 23 20 45 00 2032-99 S co CCGG 67.010 -999.990 ... AR2 2019 08 12 17 13 20 19.5362 -155.5763 3437.00 3397.00 40.00 462939 MLO 2019 07 23 20 45 00 2549-99 S co CCGG 67.090 -999.990 S.. AR2 2019 08 12 17 27 38 19.5362 -155.5763 3437.00 3397.00 40.00 462940 MLO 2019 07 23 20 53 00 3231-99 P co CCGG 70.910 -999.990 ... AR2 2019 08 12 16 44 44 19.5362 -155.5763 3402.00 3397.00 5.00 462937 MLO 2019 07 23 20 53 00 5042-99 P co CCGG 69.500 -999.990 ... AR2 2019 08 12 16 59 02 19.5362 -155.5763 3402.00 3397.00 5.00 462938 MLO 2019 07 30 19 57 00 3080-99 P co CCGG 78.980 -999.990 ... AR2 2019 08 20 12 37 31 19.5362 -155.5763 3402.00 3397.00 5.00 463251 MLO 2019 07 30 19 57 00 994-99 P co CCGG 79.830 -999.990 ... AR2 2019 08 20 12 23 14 19.5362 -155.5763 3402.00 3397.00 5.00 463250 MLO 2019 07 30 20 00 00 3064-99 S co CCGG 78.260 -999.990 ... AR2 2019 08 13 15 33 03 19.5362 -155.5763 3437.00 3397.00 40.00 463262 MLO 2019 07 30 20 00 00 4291-99 S co CCGG 78.240 -999.990 S.. AR2 2019 08 13 15 47 19 19.5362 -155.5763 3437.00 3397.00 40.00 463263 MLO 2019 08 06 19 48 00 2929-99 S co CCGG 66.260 -999.990 S.. AR2 2019 08 20 16 40 31 19.5362 -155.5763 3437.00 3397.00 40.00 463511 MLO 2019 08 06 19 48 00 3321-99 S co CCGG 66.420 -999.990 S.. AR2 2019 08 20 16 54 47 19.5362 -155.5763 3437.00 3397.00 40.00 463512 MLO 2019 08 06 20 14 00 2525-99 P co CCGG 68.010 -999.990 ... AR2 2019 08 20 17 09 03 19.5362 -155.5763 3402.00 3397.00 5.00 463513 MLO 2019 08 06 20 14 00 3448-99 P co CCGG 67.090 -999.990 ... AR2 2019 08 20 17 23 19 19.5362 -155.5763 3402.00 3397.00 5.00 463514 MLO 2019 08 13 20 04 00 1137-99 S co CCGG 62.750 -999.990 ... AR2 2019 08 27 11 40 16 19.5362 -155.5763 3437.00 3397.00 40.00 463723 MLO 2019 08 13 20 04 00 4088-99 S co CCGG 62.720 -999.990 S.. AR2 2019 08 27 11 54 34 19.5362 -155.5763 3437.00 3397.00 40.00 463724 MLO 2019 08 13 20 25 00 1061-99 P co CCGG 64.920 -999.990 ... AR2 2019 08 27 12 08 53 19.5362 -155.5763 3402.00 3397.00 5.00 463721 MLO 2019 08 13 20 25 00 5126-99 P co CCGG 63.940 -999.990 ... AR2 2019 08 27 12 23 13 19.5362 -155.5763 3402.00 3397.00 5.00 463722 MLO 2019 08 20 19 57 00 2573-99 S co CCGG 68.370 -999.990 S.. AR2 2019 09 16 12 23 09 19.5362 -155.5763 3437.00 3397.00 40.00 464401 MLO 2019 08 20 19 57 00 3702-99 S co CCGG 68.250 -999.990 S.. AR2 2019 09 16 12 37 26 19.5362 -155.5763 3437.00 3397.00 40.00 464402 MLO 2019 08 20 20 20 00 3701-99 P co CCGG 70.940 -999.990 ... AR2 2019 09 16 12 51 43 19.5362 -155.5763 3402.00 3397.00 5.00 464403 MLO 2019 08 20 20 20 00 5452-99 P co CCGG 70.050 -999.990 ... AR2 2019 09 16 13 06 00 19.5362 -155.5763 3402.00 3397.00 5.00 464404 MLO 2019 08 27 19 45 00 2044-99 S co CCGG 71.450 -999.990 S.. AR2 2019 10 01 15 04 23 19.5362 -155.5763 3437.00 3397.00 40.00 465355 MLO 2019 08 27 19 45 00 3339-99 S co CCGG 71.650 -999.990 S.. AR2 2019 10 01 15 18 44 19.5362 -155.5763 3437.00 3397.00 40.00 465356 MLO 2019 08 27 20 08 00 1287-99 P co CCGG 73.510 -999.990 ... AR2 2019 10 01 14 35 36 19.5362 -155.5763 3402.00 3397.00 5.00 465357 MLO 2019 08 27 20 08 00 3011-99 P co CCGG 72.700 -999.990 ... AR2 2019 10 01 14 50 00 19.5362 -155.5763 3402.00 3397.00 5.00 465358 MLO 2019 09 05 19 49 00 4250-99 S co CCGG 71.950 -999.990 S.. AR2 2019 09 27 16 19 25 19.5362 -155.5763 3437.00 3397.00 40.00 465363 MLO 2019 09 05 19 49 00 4964-99 S co CCGG 72.170 -999.990 S.. AR2 2019 09 27 16 33 49 19.5362 -155.5763 3437.00 3397.00 40.00 465364 MLO 2019 09 05 20 13 00 2463-99 P co CCGG 72.960 -999.990 ... AR2 2019 09 27 16 48 13 19.5362 -155.5763 3402.00 3397.00 5.00 465365 MLO 2019 09 05 20 13 00 4556-99 P co CCGG 72.240 -999.990 ... AR2 2019 09 27 17 02 34 19.5362 -155.5763 3402.00 3397.00 5.00 465366 MLO 2019 09 10 19 56 00 1087-99 S co CCGG 69.640 -999.990 S.. AR2 2019 10 04 09 11 34 19.5362 -155.5763 3437.00 3397.00 40.00 465339 MLO 2019 09 10 19 56 00 5175-99 S co CCGG 69.280 -999.990 S.. AR2 2019 10 04 09 25 55 19.5362 -155.5763 3437.00 3397.00 40.00 465340 MLO 2019 09 10 20 22 00 1170-99 P co CCGG 70.990 -999.990 ... AR2 2019 10 04 09 40 16 19.5362 -155.5763 3402.00 3397.00 5.00 465337 MLO 2019 09 10 20 22 00 1504-99 P co CCGG 69.590 -999.990 ... AR2 2019 10 04 09 54 37 19.5362 -155.5763 3402.00 3397.00 5.00 465338 MLO 2019 09 17 20 03 00 1763-99 S co CCGG 69.990 -999.990 S.. AR2 2019 10 09 15 17 00 19.5362 -155.5763 3437.00 3397.00 40.00 465734 MLO 2019 09 17 20 03 00 2019-99 S co CCGG 70.030 -999.990 S.. AR2 2019 10 09 15 31 20 19.5362 -155.5763 3437.00 3397.00 40.00 465735 MLO 2019 09 17 20 25 00 1205-99 P co CCGG 74.610 -999.990 ... AR2 2019 10 09 15 45 40 19.5362 -155.5763 3402.00 3397.00 5.00 465732 MLO 2019 09 17 20 25 00 3513-99 P co CCGG 73.550 -999.990 ... AR2 2019 10 09 16 00 00 19.5362 -155.5763 3402.00 3397.00 5.00 465733 MLO 2019 09 24 20 07 00 313-99 S co CCGG 76.620 -999.990 S.. AR2 2019 10 18 10 43 05 19.5362 -155.5763 3437.00 3397.00 40.00 465779 MLO 2019 09 24 20 07 00 968-99 S co CCGG 76.270 -999.990 S.. AR2 2019 10 18 10 57 26 19.5362 -155.5763 3437.00 3397.00 40.00 465780 MLO 2019 09 24 20 33 00 4447-99 P co CCGG 80.450 -999.990 ... AR2 2019 10 18 11 11 47 19.5362 -155.5763 3402.00 3397.00 5.00 465781 MLO 2019 09 24 20 33 00 4726-99 P co CCGG 79.800 -999.990 ... AR2 2019 10 18 11 26 08 19.5362 -155.5763 3402.00 3397.00 5.00 465782 MLO 2019 10 01 19 56 00 2385-99 S co CCGG 73.490 -999.990 S.. AR2 2019 10 28 10 36 42 19.5362 -155.5763 3437.00 3397.00 40.00 466265 MLO 2019 10 01 19 56 00 2414-99 S co CCGG 73.770 -999.990 S.. AR2 2019 10 28 10 51 01 19.5362 -155.5763 3437.00 3397.00 40.00 466266 MLO 2019 10 01 20 22 00 3561-99 P co CCGG 76.070 -999.990 ... AR2 2019 10 28 11 19 38 19.5362 -155.5763 3402.00 3397.00 5.00 466264 MLO 2019 10 01 20 22 00 835-99 P co CCGG 75.940 -999.990 ... AR2 2019 10 28 11 05 19 19.5362 -155.5763 3402.00 3397.00 5.00 466263 MLO 2019 10 10 19 47 00 3757-99 S co CCGG 72.150 -999.990 N.. AR2 2019 11 06 12 28 16 19.5362 -155.5763 3437.00 3397.00 40.00 466766 MLO 2019 10 10 19 47 00 5147-99 S co CCGG 67.650 -999.990 N.. AR2 2019 11 06 12 42 37 19.5362 -155.5763 3437.00 3397.00 40.00 466767 MLO 2019 10 10 20 05 00 1481-99 S co CCGG 68.280 -999.990 S.. AR2 2019 11 06 11 59 37 19.5362 -155.5763 3437.00 3397.00 40.00 466764 MLO 2019 10 10 20 05 00 2337-99 S co CCGG 67.940 -999.990 S.. AR2 2019 11 06 12 13 57 19.5362 -155.5763 3437.00 3397.00 40.00 466765 MLO 2019 10 15 19 45 00 1582-99 S co CCGG 72.510 -999.990 S.. AR2 2019 11 12 10 58 00 19.5362 -155.5763 3437.00 3397.00 40.00 466825 MLO 2019 10 15 19 45 00 233-99 S co CCGG 72.860 -999.990 S.. AR2 2019 11 12 10 43 37 19.5362 -155.5763 3437.00 3397.00 40.00 466824 MLO 2019 10 15 20 16 00 2524-99 P co CCGG 75.190 -999.990 ... AR2 2019 11 12 11 12 23 19.5362 -155.5763 3402.00 3397.00 5.00 466822 MLO 2019 10 15 20 16 00 3324-99 P co CCGG 75.170 -999.990 ... AR2 2019 11 12 11 26 41 19.5362 -155.5763 3402.00 3397.00 5.00 466823 MLO 2019 10 22 20 03 00 518-99 P co CCGG 82.140 -999.990 ... AR2 2019 11 15 17 21 37 19.5362 -155.5763 3402.00 3397.00 5.00 467022 MLO 2019 10 22 20 27 00 1115-99 S co CCGG 79.950 -999.990 S.. AR2 2019 11 18 09 41 11 19.5362 -155.5763 3437.00 3397.00 40.00 467020 MLO 2019 10 22 20 27 00 3273-99 S co CCGG 79.560 -999.990 S.. AR2 2019 11 18 09 55 30 19.5362 -155.5763 3437.00 3397.00 40.00 467021 MLO 2019 10 29 19 50 00 2440-99 P co CCGG 74.340 -999.990 ... AR2 2019 11 15 10 04 57 19.5362 -155.5763 3402.00 3397.00 5.00 467413 MLO 2019 10 29 19 50 00 2666-99 P co CCGG 74.060 -999.990 ... AR2 2019 11 15 10 19 15 19.5362 -155.5763 3402.00 3397.00 5.00 467414 MLO 2019 10 29 20 15 00 516-99 S co CCGG 73.840 -999.990 S.. AR2 2019 11 15 10 33 33 19.5362 -155.5763 3437.00 3397.00 40.00 467415 MLO 2019 10 29 20 15 00 721-99 S co CCGG 73.730 -999.990 S.. AR2 2019 11 15 10 47 57 19.5362 -155.5763 3437.00 3397.00 40.00 467416 MLO 2019 11 05 20 00 00 2764-99 P co CCGG 87.680 -999.990 ... AR2 2019 11 22 15 46 04 19.5362 -155.5763 3402.00 3397.00 5.00 467646 MLO 2019 11 05 20 00 00 5152-99 P co CCGG 88.200 -999.990 ... AR2 2019 11 22 16 00 22 19.5362 -155.5763 3402.00 3397.00 5.00 467647 MLO 2019 11 05 20 22 00 4008-99 S co CCGG 84.930 -999.990 S.. AR2 2019 11 22 15 17 29 19.5362 -155.5763 3437.00 3397.00 40.00 467648 MLO 2019 11 05 20 22 00 4449-99 S co CCGG 85.090 -999.990 S.. AR2 2019 11 22 15 31 47 19.5362 -155.5763 3437.00 3397.00 40.00 467649 MLO 2019 11 14 19 50 00 1014-99 P co CCGG 85.960 -999.990 ... AR2 2019 12 04 13 24 21 19.5362 -155.5763 3437.00 3397.00 40.00 467790 MLO 2019 11 14 19 50 00 2142-99 P co CCGG 84.870 -999.990 ... AR2 2019 12 04 13 38 42 19.5362 -155.5763 3437.00 3397.00 40.00 467791 MLO 2019 11 14 20 07 00 4478-99 S co CCGG 81.920 -999.990 S.. AR2 2019 12 04 14 07 24 19.5362 -155.5763 3437.00 3397.00 40.00 467789 MLO 2019 11 14 20 07 00 561-99 S co CCGG 82.070 -999.990 S.. AR2 2019 12 04 13 53 03 19.5362 -155.5763 3437.00 3397.00 40.00 467788 MLO 2019 11 19 20 04 00 2350-99 P co CCGG 79.460 -999.990 ... AR2 2019 12 13 10 31 06 19.5362 -155.5763 3437.00 3397.00 40.00 467980 MLO 2019 11 19 20 04 00 4255-99 P co CCGG 79.030 -999.990 ... AR2 2019 12 13 10 45 23 19.5362 -155.5763 3437.00 3397.00 40.00 467981 MLO 2019 11 19 20 22 00 1533-99 S co CCGG 78.290 -999.990 S.. AR2 2019 12 13 10 02 27 19.5362 -155.5763 3437.00 3397.00 40.00 467978 MLO 2019 11 19 20 22 00 4808-99 S co CCGG 77.720 -999.990 S.. AR2 2019 12 13 10 16 48 19.5362 -155.5763 3437.00 3397.00 40.00 467979 MLO 2019 11 26 20 00 00 3403-99 P co CCGG 78.020 -999.990 ... AR2 2020 01 02 13 29 26 19.5362 -155.5763 3402.00 3397.00 5.00 468495 MLO 2019 11 26 20 00 00 5598-99 P co CCGG 75.620 -999.990 ... AR2 2020 01 02 13 43 46 19.5362 -155.5763 3402.00 3397.00 5.00 468496 MLO 2019 11 26 20 04 00 300-99 S co CCGG 75.230 -999.990 S.. AR2 2020 01 02 13 58 06 19.5362 -155.5763 3437.00 3397.00 40.00 468493 MLO 2019 11 26 20 04 00 5706-99 S co CCGG 74.430 -999.990 S.. AR2 2020 01 02 14 12 32 19.5362 -155.5763 3437.00 3397.00 40.00 468494 MLO 2019 12 03 19 48 00 1468-99 P co CCGG 86.100 -999.990 ... AR2 2020 01 13 10 34 16 19.5362 -155.5763 3402.00 3397.00 5.00 468570 MLO 2019 12 03 19 48 00 2108-99 P co CCGG 85.940 -999.990 ... AR2 2020 01 13 10 48 32 19.5362 -155.5763 3402.00 3397.00 5.00 468571 MLO 2019 12 03 19 52 00 1153-99 S co CCGG 84.020 -999.990 S.. AR2 2020 01 13 10 05 45 19.5362 -155.5763 3437.00 3397.00 40.00 468572 MLO 2019 12 03 19 52 00 639-99 S co CCGG 84.250 -999.990 S.. AR2 2020 01 13 10 20 01 19.5362 -155.5763 3437.00 3397.00 40.00 468573 MLO 2019 12 10 20 07 00 515-99 P co CCGG 86.190 -999.990 ... AR2 2020 01 24 09 30 24 19.5362 -155.5763 3402.00 3397.00 5.00 468954 MLO 2019 12 10 20 07 00 5596-99 P co CCGG 85.320 -999.990 ... AR2 2020 01 24 09 44 44 19.5362 -155.5763 3402.00 3397.00 5.00 468955 MLO 2019 12 10 20 24 00 2083-99 S co CCGG 84.090 -999.990 S.. AR2 2020 01 23 17 18 50 19.5362 -155.5763 3437.00 3397.00 40.00 468956 MLO 2019 12 10 20 24 00 3840-99 S co CCGG 83.910 -999.990 S.. AR2 2020 01 23 17 33 09 19.5362 -155.5763 3437.00 3397.00 40.00 468957 MLO 2019 12 17 20 07 00 1727-99 P co CCGG 87.300 -999.990 ... AR2 2020 01 27 08 58 15 19.5362 -155.5763 3402.00 3397.00 5.00 469140 MLO 2019 12 17 20 07 00 3746-99 P co CCGG 86.730 -999.990 ... AR2 2020 01 27 09 12 35 19.5362 -155.5763 3402.00 3397.00 5.00 469141 MLO 2019 12 17 20 10 00 4564-99 S co CCGG 88.910 -999.990 S.. AR2 2020 01 27 09 26 55 19.5362 -155.5763 3437.00 3397.00 40.00 469142 MLO 2019 12 17 20 10 00 4584-99 S co CCGG 88.360 -999.990 S.. AR2 2020 01 27 09 41 13 19.5362 -155.5763 3437.00 3397.00 40.00 469143 MLO 2019 12 26 19 55 00 1763-99 S co CCGG 97.340 -999.990 S.. AR2 2020 02 20 13 38 06 19.5362 -155.5763 3437.00 3397.00 40.00 470492 MLO 2019 12 26 19 55 00 5296-99 S co CCGG 96.830 -999.990 S.. AR2 2020 02 20 13 23 48 19.5362 -155.5763 3437.00 3397.00 40.00 470491 MLO 2019 12 26 20 07 00 516-99 P co CCGG 99.760 -999.990 ... AR2 2020 02 20 13 52 25 19.5362 -155.5763 3402.00 3397.00 5.00 470489 MLO 2019 12 26 20 07 00 721-99 P co CCGG 99.020 -999.990 ... AR2 2020 02 20 14 06 44 19.5362 -155.5763 3402.00 3397.00 5.00 470490 MLO 2020 01 02 19 56 00 105-99 S co CCGG 96.690 -999.990 S.. AR2 2020 02 03 15 18 02 19.5362 -155.5763 3437.00 3397.00 40.00 469685 MLO 2020 01 02 19 56 00 1187-99 S co CCGG 96.820 -999.990 S.. AR2 2020 02 03 15 32 23 19.5362 -155.5763 3437.00 3397.00 40.00 469686 MLO 2020 01 02 20 02 00 3727-99 P co CCGG 102.280 -999.990 ... AR2 2020 02 03 14 49 21 19.5362 -155.5763 3402.00 3397.00 5.00 469683 MLO 2020 01 02 20 02 00 4449-99 P co CCGG 101.290 -999.990 ... AR2 2020 02 03 15 03 43 19.5362 -155.5763 3402.00 3397.00 5.00 469684 MLO 2020 01 09 20 05 00 3247-99 P co CCGG 99.700 -999.990 ... AR2 2020 02 07 15 21 47 19.5362 -155.5763 3437.00 3397.00 40.00 470012 MLO 2020 01 09 20 05 00 4753-99 P co CCGG 98.400 -999.990 ... AR2 2020 02 07 15 36 12 19.5362 -155.5763 3437.00 3397.00 40.00 470013 MLO 2020 01 09 20 10 00 2161-99 S co CCGG 97.890 -999.990 S.. AR2 2020 02 07 14 53 11 19.5362 -155.5763 3437.00 3397.00 40.00 470010 MLO 2020 01 09 20 10 00 3119-99 S co CCGG 98.050 -999.990 S.. AR2 2020 02 07 15 07 30 19.5362 -155.5763 3437.00 3397.00 40.00 470011 MLO 2020 01 14 19 51 00 1061-99 S co CCGG 80.190 -999.990 S.. AR2 2020 02 14 09 47 15 19.5362 -155.5763 3437.00 3397.00 40.00 469972 MLO 2020 01 14 19 51 00 2825-99 S co CCGG 80.590 -999.990 S.. AR2 2020 02 14 10 01 36 19.5362 -155.5763 3437.00 3397.00 40.00 469973 MLO 2020 01 14 20 01 00 3721-99 P co CCGG 81.490 -999.990 ... AR2 2020 02 14 10 16 00 19.5362 -155.5763 3402.00 3397.00 5.00 469970 MLO 2020 01 14 20 01 00 3984-99 P co CCGG 80.900 -999.990 ... AR2 2020 02 14 10 30 23 19.5362 -155.5763 3402.00 3397.00 5.00 469971 MLO 2020 01 21 19 57 00 1751-99 S co CCGG 116.090 -999.990 S.. AR2 2020 02 20 14 49 43 19.5362 -155.5763 3437.00 3397.00 40.00 470494 MLO 2020 01 21 19 57 00 4739-99 S co CCGG 117.140 -999.990 S.. AR2 2020 02 20 15 04 03 19.5362 -155.5763 3437.00 3397.00 40.00 470493 MLO 2020 01 21 20 18 00 2949-99 P co CCGG 126.570 -999.990 ... AR2 2020 02 20 14 21 06 19.5362 -155.5763 3402.00 3397.00 5.00 470495 MLO 2020 01 21 20 18 00 4073-99 P co CCGG 126.080 -999.990 ... AR2 2020 02 20 14 35 24 19.5362 -155.5763 3402.00 3397.00 5.00 470496 MLO 2020 01 28 19 54 00 2871-99 S co CCGG 102.040 -999.990 S.. AR2 2020 03 11 14 13 58 19.5362 -155.5763 3437.00 3397.00 40.00 471400 MLO 2020 01 28 19 54 00 314-99 S co CCGG 100.300 -999.990 S.. AR2 2020 03 11 13 59 38 19.5362 -155.5763 3437.00 3397.00 40.00 471399 MLO 2020 01 28 20 21 00 3829-99 P co CCGG 103.710 -999.990 ... AR2 2020 03 11 14 28 18 19.5362 -155.5763 3402.00 3397.00 5.00 471401 MLO 2020 01 28 20 21 00 4734-99 P co CCGG 106.280 -999.990 ... AR2 2020 03 11 14 42 39 19.5362 -155.5763 3402.00 3397.00 5.00 471402 MLO 2020 02 04 20 02 00 4196-99 S co CCGG 102.950 -999.990 S.. AR2 2020 03 17 14 57 41 19.5362 -155.5763 3437.00 3397.00 40.00 471571 MLO 2020 02 04 20 02 00 4478-99 S co CCGG 102.770 -999.990 S.. AR2 2020 03 17 15 12 06 19.5362 -155.5763 3437.00 3397.00 40.00 471572 MLO 2020 02 04 20 30 00 4313-99 P co CCGG 106.750 -999.990 ... AR2 2020 03 11 12 19 12 19.5362 -155.5763 3402.00 3397.00 5.00 471564 MLO 2020 02 13 19 46 00 2619-99 S co CCGG 83.300 -999.990 S.. AR2 2020 03 18 11 35 10 19.5362 -155.5763 3437.00 3397.00 40.00 471587 MLO 2020 02 13 19 46 00 3841-99 S co CCGG 83.960 -999.990 S.. AR2 2020 03 18 11 20 49 19.5362 -155.5763 3437.00 3397.00 40.00 471586 MLO 2020 02 13 20 05 00 2565-99 P co CCGG 84.410 -999.990 ... AR2 2020 03 18 11 49 35 19.5362 -155.5763 3402.00 3397.00 5.00 471584 MLO 2020 02 13 20 05 00 3526-99 P co CCGG 85.380 -999.990 ... AR2 2020 03 18 12 03 56 19.5362 -155.5763 3402.00 3397.00 5.00 471585 MLO 2020 02 18 19 45 00 1225-99 S co CCGG 99.860 -999.990 S.. AR2 2020 03 18 10 09 13 19.5362 -155.5763 3437.00 3397.00 40.00 471262 MLO 2020 02 18 19 45 00 3007-99 S co CCGG 100.170 -999.990 S.. AR2 2020 03 18 10 23 32 19.5362 -155.5763 3437.00 3397.00 40.00 471263 MLO 2020 02 18 20 07 00 1116-99 P co CCGG 102.870 -999.990 ... AR2 2020 03 17 16 23 49 19.5362 -155.5763 3402.00 3397.00 5.00 471258 MLO 2020 02 18 20 07 00 3524-99 P co CCGG 102.100 -999.990 ... AR2 2020 03 17 16 38 10 19.5362 -155.5763 3402.00 3397.00 5.00 471259 MLO 2020 02 25 19 46 00 1026-99 S co CCGG 103.170 -999.990 S.. AR2 2020 03 19 11 28 48 19.5362 -155.5763 3437.00 3397.00 40.00 471795 MLO 2020 02 25 19 46 00 1155-99 S co CCGG 103.190 -999.990 S.. AR2 2020 03 19 11 43 11 19.5362 -155.5763 3437.00 3397.00 40.00 471796 MLO 2020 02 25 20 10 00 4014-99 P co CCGG 105.900 -999.990 ... AR2 2020 03 19 11 00 03 19.5362 -155.5763 3402.00 3397.00 5.00 471793 MLO 2020 02 25 20 10 00 5364-99 P co CCGG 104.040 -999.990 ... AR2 2020 03 19 11 14 24 19.5362 -155.5763 3402.00 3397.00 5.00 471794 MLO 2020 03 05 19 59 00 140-99 S co CCGG 100.500 -999.990 S.. AR2 2020 04 01 12 56 34 19.5362 -155.5763 3437.00 3397.00 40.00 472272 MLO 2020 03 05 19 59 00 5253-99 S co CCGG 100.640 -999.990 S.. AR2 2020 04 01 13 10 54 19.5362 -155.5763 3437.00 3397.00 40.00 472273 MLO 2020 03 05 20 06 00 361-99 P co CCGG 104.320 -999.990 ... AR2 2020 04 01 13 25 14 19.5362 -155.5763 3402.00 3397.00 5.00 472274 MLO 2020 03 05 20 06 00 4886-99 P co CCGG 104.240 -999.990 ... AR2 2020 04 01 13 39 36 19.5362 -155.5763 3402.00 3397.00 5.00 472275 MLO 2020 03 12 19 50 00 1789-99 S co CCGG 110.700 -999.990 S.. AR2 2020 06 17 13 29 49 19.5362 -155.5763 3437.00 3397.00 40.00 475726 MLO 2020 03 12 19 50 00 933-99 S co CCGG 110.510 -999.990 S.. AR2 2020 06 17 13 15 30 19.5362 -155.5763 3437.00 3397.00 40.00 475725 MLO 2020 03 12 20 12 00 3553-99 P co CCGG 114.080 -999.990 ... AR2 2020 06 17 12 46 50 19.5362 -155.5763 3402.00 3397.00 5.00 475729 MLO 2020 03 12 20 12 00 3808-99 P co CCGG 112.610 -999.990 ... AR2 2020 06 17 13 01 11 19.5362 -155.5763 3402.00 3397.00 5.00 475730 MLO 2020 03 17 19 31 00 3639-99 S co CCGG 88.710 -999.990 S.. AR2 2020 04 02 16 29 48 19.5362 -155.5763 3437.00 3397.00 40.00 472562 MLO 2020 03 17 19 31 00 5694-99 S co CCGG 88.570 -999.990 S.. AR2 2020 04 02 16 15 27 19.5362 -155.5763 3437.00 3397.00 40.00 472563 MLO 2020 03 17 19 56 00 2932-99 P co CCGG 102.950 -999.990 ... AR2 2020 04 03 09 21 50 19.5362 -155.5763 3402.00 3397.00 5.00 472560 MLO 2020 03 17 19 56 00 4484-99 P co CCGG 101.870 -999.990 ... AR2 2020 04 03 09 36 09 19.5362 -155.5763 3402.00 3397.00 5.00 472561 MLO 2020 03 24 19 51 00 5406-99 P co CCGG 116.760 -999.990 ... AR2 2020 04 16 12 11 27 19.5362 -155.5763 3402.00 3397.00 5.00 473142 MLO 2020 03 24 19 51 00 674-99 P co CCGG 117.550 -999.990 ... AR2 2020 04 16 11 57 02 19.5362 -155.5763 3402.00 3397.00 5.00 473141 MLO 2020 03 31 19 50 00 1869-99 P co CCGG 118.900 -999.990 N.. AR2 2020 06 15 12 42 20 19.5362 -155.5763 3402.00 3397.00 5.00 475769 MLO 2020 03 31 19 50 00 3554-99 P co CCGG 114.430 -999.990 N.. AR2 2020 06 15 12 56 42 19.5362 -155.5763 3402.00 3397.00 5.00 475770 MLO 2020 04 07 20 00 00 3435-99 P co CCGG 117.820 -999.990 ... AR2 2020 04 24 15 37 53 19.5362 -155.5763 3402.00 3397.00 5.00 473520 MLO 2020 04 07 20 00 00 788-99 P co CCGG 119.270 -999.990 ... AR2 2020 04 24 15 23 30 19.5362 -155.5763 3402.00 3397.00 5.00 473521 MLO 2020 04 14 20 08 00 2627-99 P co CCGG 130.130 -999.990 ... AR2 2020 04 24 14 54 52 19.5362 -155.5763 3402.00 3397.00 5.00 473522 MLO 2020 04 14 20 08 00 3735-99 P co CCGG 129.970 -999.990 ... AR2 2020 04 24 15 09 11 19.5362 -155.5763 3402.00 3397.00 5.00 473523 MLO 2020 04 21 20 00 00 2014-99 P co CCGG 116.210 -999.990 ... AR2 2020 05 15 13 48 46 19.5362 -155.5763 3402.00 3397.00 5.00 474480 MLO 2020 04 21 20 00 00 3334-99 P co CCGG 115.410 -999.990 ... AR2 2020 05 15 14 03 07 19.5362 -155.5763 3402.00 3397.00 5.00 474481 MLO 2020 04 28 19 56 00 2591-99 P co CCGG 100.400 -999.990 ... AR2 2020 05 15 15 15 01 19.5362 -155.5763 3402.00 3397.00 5.00 474482 MLO 2020 04 28 19 56 00 3678-99 P co CCGG 99.650 -999.990 ... AR2 2020 05 15 15 29 20 19.5362 -155.5763 3402.00 3397.00 5.00 474483 MLO 2020 05 05 20 08 00 4056-99 P co CCGG 102.760 -999.990 ... AR2 2020 05 19 10 08 07 19.5362 -155.5763 3402.00 3397.00 5.00 474460 MLO 2020 05 05 20 08 00 5445-99 P co CCGG 101.570 -999.990 ... AR2 2020 05 19 10 22 25 19.5362 -155.5763 3402.00 3397.00 5.00 474461 MLO 2020 05 12 19 52 00 151-99 P co CCGG 101.780 -999.990 ... AR2 2020 05 29 13 19 05 19.5362 -155.5763 3402.00 3397.00 5.00 474875 MLO 2020 05 12 19 52 00 1878-99 P co CCGG 101.630 -999.990 ... AR2 2020 05 29 13 33 26 19.5362 -155.5763 3402.00 3397.00 5.00 474876 MLO 2020 05 12 20 09 00 3585-99 S co CCGG 100.310 -999.990 S.. AR2 2020 05 29 14 02 06 19.5362 -155.5763 3437.00 3397.00 40.00 474874 MLO 2020 05 12 20 09 00 908-99 S co CCGG 100.780 -999.990 S.. AR2 2020 05 29 13 47 47 19.5362 -155.5763 3437.00 3397.00 40.00 474873 MLO 2020 05 19 19 52 00 1354-99 S co CCGG 92.670 -999.990 S.. AR2 2020 06 19 12 17 11 19.5362 -155.5763 3437.00 3397.00 40.00 475907 MLO 2020 05 19 19 52 00 5485-99 S co CCGG 93.040 -999.990 S.. AR2 2020 06 19 12 31 32 19.5362 -155.5763 3437.00 3397.00 40.00 475908 MLO 2020 05 19 20 15 00 1299-99 P co CCGG 95.400 -999.990 ... AR2 2020 06 16 10 04 34 19.5362 -155.5763 3402.00 3397.00 5.00 475847 MLO 2020 05 19 20 15 00 4081-99 P co CCGG 94.920 -999.990 ... AR2 2020 06 16 10 18 54 19.5362 -155.5763 3402.00 3397.00 5.00 475848 MLO 2020 05 26 19 51 00 5077-99 S co CCGG 103.790 -999.990 S.. AR2 2020 06 17 14 12 51 19.5362 -155.5763 3437.00 3397.00 40.00 475723 MLO 2020 05 26 19 51 00 5189-99 S co CCGG 103.160 -999.990 S.. AR2 2020 06 17 14 27 13 19.5362 -155.5763 3437.00 3397.00 40.00 475724 MLO 2020 05 26 20 15 00 180-99 P co CCGG 91.960 -999.990 ... AR2 2020 06 17 13 44 09 19.5362 -155.5763 3402.00 3397.00 5.00 475727 MLO 2020 05 26 20 15 00 3900-99 P co CCGG 90.950 -999.990 ... AR2 2020 06 17 13 58 28 19.5362 -155.5763 3402.00 3397.00 5.00 475728 MLO 2020 06 02 19 52 00 5646-99 P co CCGG 117.010 -999.990 ... AR2 2020 06 29 13 36 20 19.5362 -155.5763 3402.00 3397.00 5.00 476326 MLO 2020 06 02 19 52 00 5662-99 P co CCGG 170.290 -999.990 A.. AR2 2020 06 29 13 50 42 19.5362 -155.5763 3402.00 3397.00 5.00 476327 MLO 2020 06 02 19 52 00 5662-99 P co CCGG 115.430 -999.990 ... AR2 2020 06 29 14 33 35 19.5362 -155.5763 3402.00 3397.00 5.00 476327 MLO 2020 06 02 19 58 00 3982-99 S co CCGG 93.500 -999.990 S.. AR2 2020 06 29 14 04 53 19.5362 -155.5763 3437.00 3397.00 40.00 476328 MLO 2020 06 02 19 58 00 5258-99 S co CCGG 93.370 -999.990 S.. AR2 2020 06 29 14 19 14 19.5362 -155.5763 3437.00 3397.00 40.00 476329 MLO 2020 06 09 20 05 00 3245-99 P co CCGG 84.510 -999.990 ... AR2 2020 07 06 16 09 59 19.5362 -155.5763 3402.00 3397.00 5.00 476286 MLO 2020 06 09 20 05 00 4105-99 P co CCGG 83.750 -999.990 ... AR2 2020 07 06 16 24 24 19.5362 -155.5763 3402.00 3397.00 5.00 476287 MLO 2020 06 09 20 07 00 456-99 S co CCGG 80.920 -999.990 S.. AR2 2020 06 26 14 55 50 19.5362 -155.5763 3437.00 3397.00 40.00 476299 MLO 2020 06 09 20 07 00 484-99 S co CCGG 81.590 -999.990 S.. AR2 2020 06 26 15 10 10 19.5362 -155.5763 3437.00 3397.00 40.00 476300 MLO 2020 06 16 20 03 00 2122-99 S co CCGG 78.740 -999.990 S.. AR2 2020 07 09 14 28 29 19.5362 -155.5763 3437.00 3397.00 40.00 476888 MLO 2020 06 16 20 03 00 2565-99 S co CCGG 78.490 -999.990 S.. AR2 2020 07 09 14 42 50 19.5362 -155.5763 3437.00 3397.00 40.00 476889 MLO 2020 06 16 20 08 00 1061-99 P co CCGG 80.360 -999.990 ... AR2 2020 07 09 14 14 08 19.5362 -155.5763 3402.00 3397.00 5.00 476891 MLO 2020 06 16 20 08 00 110-99 P co CCGG 81.050 -999.990 ... AR2 2020 07 09 13 59 47 19.5362 -155.5763 3402.00 3397.00 5.00 476890 MLO 2020 06 23 19 59 00 4540-99 S co CCGG 84.090 -999.990 S.. AR2 2020 07 20 12 40 12 19.5362 -155.5763 3437.00 3397.00 40.00 477051 MLO 2020 06 23 19 59 00 4972-99 S co CCGG 84.230 -999.990 S.. AR2 2020 07 20 12 54 36 19.5362 -155.5763 3437.00 3397.00 40.00 477052 MLO 2020 06 23 20 03 00 339-99 P co CCGG 87.920 -999.990 ... AR2 2020 07 20 13 09 01 19.5362 -155.5763 3402.00 3397.00 5.00 477049 MLO 2020 06 23 20 03 00 610-99 P co CCGG 87.680 -999.990 ... AR2 2020 07 20 13 23 23 19.5362 -155.5763 3402.00 3397.00 5.00 477050 MLO 2020 06 30 20 17 00 1689-99 S co CCGG 72.250 -999.990 S.. AR2 2020 07 28 10 45 49 19.5362 -155.5763 3437.00 3397.00 40.00 477421 MLO 2020 06 30 20 17 00 3980-99 S co CCGG 72.250 -999.990 S.. AR2 2020 07 28 11 00 10 19.5362 -155.5763 3437.00 3397.00 40.00 477422 MLO 2020 06 30 20 23 00 1511-99 P co CCGG 74.770 -999.990 ... AR2 2020 07 28 11 14 31 19.5362 -155.5763 3402.00 3397.00 5.00 477423 MLO 2020 06 30 20 23 00 2981-99 P co CCGG 73.950 -999.990 ... AR2 2020 07 28 11 28 51 19.5362 -155.5763 3402.00 3397.00 5.00 477424 MLO 2020 07 07 20 11 00 1016-99 S co CCGG 72.700 -999.990 S.. AR2 2020 07 23 10 31 05 19.5362 -155.5763 3437.00 3397.00 40.00 477497 MLO 2020 07 07 20 11 00 975-99 S co CCGG 72.700 -999.990 S.. AR2 2020 07 23 10 16 41 19.5362 -155.5763 3437.00 3397.00 40.00 477498 MLO 2020 07 07 20 34 00 1386-99 P co CCGG 74.790 -999.990 ... AR2 2020 07 23 10 45 28 19.5362 -155.5763 3402.00 3397.00 5.00 477499 MLO 2020 07 07 20 34 00 4636-99 P co CCGG 73.690 -999.990 ... AR2 2020 07 23 10 59 56 19.5362 -155.5763 3402.00 3397.00 5.00 477500 MLO 2020 07 14 19 36 00 431-99 P co CCGG 67.530 -999.990 ... AR2 2020 08 11 15 11 45 19.5362 -155.5763 3402.00 3397.00 5.00 478389 MLO 2020 07 14 19 36 00 4763-99 P co CCGG 66.260 -999.990 ... AR2 2020 08 11 15 26 08 19.5362 -155.5763 3402.00 3397.00 5.00 478390 MLO 2020 07 14 19 40 00 3094-99 S co CCGG 63.890 -999.990 S.. AR2 2020 08 11 15 54 53 19.5362 -155.5763 3437.00 3397.00 40.00 478391 MLO 2020 07 14 19 40 00 958-99 S co CCGG 63.980 -999.990 S.. AR2 2020 08 11 15 40 32 19.5362 -155.5763 3437.00 3397.00 40.00 478392 MLO 2020 07 21 20 19 00 2320-99 S co CCGG 63.720 -999.990 S.. AR2 2020 08 07 12 49 02 19.5362 -155.5763 3437.00 3397.00 40.00 478163 MLO 2020 07 21 20 19 00 4583-99 S co CCGG 63.570 -999.990 S.. AR2 2020 08 07 13 03 24 19.5362 -155.5763 3437.00 3397.00 40.00 478164 MLO 2020 07 21 20 26 00 3362-99 P co CCGG 65.660 -999.990 ... AR2 2020 08 07 13 17 45 19.5362 -155.5763 3402.00 3397.00 5.00 478161 MLO 2020 07 21 20 26 00 4041-99 P co CCGG 64.810 -999.990 ... AR2 2020 08 07 13 32 08 19.5362 -155.5763 3402.00 3397.00 5.00 478162 MLO 2020 07 28 18 45 00 410-99 S co CCGG 65.000 -999.990 S.. AR2 2020 08 17 12 39 56 19.5362 -155.5763 3437.00 3397.00 40.00 478511 MLO 2020 07 28 18 45 00 5229-99 S co CCGG 64.260 -999.990 S.. AR2 2020 08 17 12 54 21 19.5362 -155.5763 3437.00 3397.00 40.00 478512 MLO 2020 07 28 19 02 00 4642-99 P co CCGG 66.150 -999.990 ... AR2 2020 08 17 12 11 11 19.5362 -155.5763 3402.00 3397.00 5.00 478513 MLO 2020 07 28 19 02 00 4975-99 P co CCGG 65.280 -999.990 ... AR2 2020 08 17 12 25 34 19.5362 -155.5763 3402.00 3397.00 5.00 478514 MLO 2020 08 04 19 52 00 2708-99 S co CCGG 68.520 -999.990 S.. AR2 2020 08 17 16 15 33 19.5362 -155.5763 3437.00 3397.00 40.00 478669 MLO 2020 08 04 19 52 00 4620-99 S co CCGG 67.580 -999.990 S.. AR2 2020 08 17 16 29 54 19.5362 -155.5763 3437.00 3397.00 40.00 478670 MLO 2020 08 04 20 20 00 1196-99 P co CCGG 69.720 -999.990 ... AR2 2020 08 17 15 46 52 19.5362 -155.5763 3402.00 3397.00 5.00 478671 MLO 2020 08 04 20 20 00 3601-99 P co CCGG 69.110 -999.990 ... AR2 2020 08 17 16 01 11 19.5362 -155.5763 3402.00 3397.00 5.00 478672 MLO 2020 08 11 19 30 00 3027-99 S co CCGG 66.820 -999.990 S.. AR2 2020 09 09 16 11 18 19.5362 -155.5763 3437.00 3397.00 40.00 479549 MLO 2020 08 11 19 30 00 4499-99 S co CCGG 66.440 -999.990 S.. AR2 2020 09 09 16 25 44 19.5362 -155.5763 3437.00 3397.00 40.00 479550 MLO 2020 08 11 19 50 00 4556-99 P co CCGG 68.500 -999.990 ... AR2 2020 09 09 15 42 33 19.5362 -155.5763 3402.00 3397.00 5.00 479551 MLO 2020 08 11 19 50 00 5571-99 P co CCGG 67.740 -999.990 ... AR2 2020 09 09 15 56 56 19.5362 -155.5763 3402.00 3397.00 5.00 479552 MLO 2020 08 18 19 59 00 348-99 S co CCGG 62.160 -999.990 S.. AR2 2020 09 09 11 52 06 19.5362 -155.5763 3437.00 3397.00 40.00 479621 MLO 2020 08 18 19 59 00 3718-99 S co CCGG 61.710 -999.990 S.. AR2 2020 09 09 12 06 28 19.5362 -155.5763 3437.00 3397.00 40.00 479622 MLO 2020 08 18 20 21 00 1645-99 P co CCGG 64.890 -999.990 ... AR2 2020 09 09 11 23 21 19.5362 -155.5763 3402.00 3397.00 5.00 479624 MLO 2020 08 18 20 21 00 972-99 P co CCGG 65.700 -999.990 ... AR2 2020 09 09 11 37 44 19.5362 -155.5763 3402.00 3397.00 5.00 479623 MLO 2020 08 25 19 55 00 4826-99 P co CCGG 92.980 -999.990 ... AR2 2020 09 09 10 54 27 19.5362 -155.5763 3402.00 3397.00 5.00 479619 MLO 2020 08 25 19 55 00 5651-99 P co CCGG 92.780 -999.990 ... AR2 2020 09 09 11 08 59 19.5362 -155.5763 3402.00 3397.00 5.00 479620 MLO 2020 08 25 19 59 00 1053-99 S co CCGG 90.840 -999.990 S.. AR2 2020 09 09 15 13 49 19.5362 -155.5763 3437.00 3397.00 40.00 479553 MLO 2020 08 25 19 59 00 5490-99 S co CCGG 91.070 -999.990 S.. AR2 2020 09 09 15 28 11 19.5362 -155.5763 3437.00 3397.00 40.00 479554 MLO 2020 09 01 18 48 00 2592-99 P co CCGG 73.690 -999.990 ... AR2 2020 09 22 14 47 17 19.5362 -155.5763 3402.00 3397.00 5.00 479812 MLO 2020 09 01 18 48 00 3796-99 P co CCGG 73.500 -999.990 ... AR2 2020 09 22 15 01 55 19.5362 -155.5763 3402.00 3397.00 5.00 479813 MLO 2020 09 01 18 53 00 2768-99 S co CCGG 71.060 -999.990 S.. AR2 2020 09 22 14 18 13 19.5362 -155.5763 3437.00 3397.00 40.00 479814 MLO 2020 09 01 18 53 00 4844-99 S co CCGG 71.200 -999.990 S.. AR2 2020 09 22 14 32 45 19.5362 -155.5763 3437.00 3397.00 40.00 479815 MLO 2020 09 08 19 50 00 1553-99 S co CCGG 71.270 -999.990 S.. AR2 2020 09 29 13 38 37 19.5362 -155.5763 3437.00 3397.00 40.00 480087 MLO 2020 09 08 19 50 00 2571-99 S co CCGG 70.140 -999.990 S.. AR2 2020 09 29 13 52 54 19.5362 -155.5763 3437.00 3397.00 40.00 480088 MLO 2020 09 08 20 14 00 1109-99 P co CCGG 75.530 -999.990 ... AR2 2020 09 29 14 21 26 19.5362 -155.5763 3402.00 3397.00 5.00 480086 MLO 2020 09 08 20 14 00 398-99 P co CCGG 77.380 -999.990 ... AR2 2020 09 29 14 07 10 19.5362 -155.5763 3402.00 3397.00 5.00 480085 MLO 2020 09 15 19 53 00 1297-99 S co CCGG 72.630 -999.990 S.. AR2 2020 09 29 16 01 26 19.5362 -155.5763 3437.00 3397.00 40.00 480250 MLO 2020 09 15 19 53 00 5886-99 S co CCGG 72.230 -999.990 S.. AR2 2020 09 29 16 15 43 19.5362 -155.5763 3437.00 3397.00 40.00 480251 MLO 2020 09 15 20 18 00 1857-99 P co CCGG 76.370 -999.990 ... AR2 2020 09 29 15 32 51 19.5362 -155.5763 3402.00 3397.00 5.00 480252 MLO 2020 09 15 20 18 00 2674-99 P co CCGG 76.500 -999.990 ... AR2 2020 09 29 15 47 08 19.5362 -155.5763 3402.00 3397.00 5.00 480253 MLO 2020 09 22 19 46 00 320-99 S co CCGG 87.700 -999.990 S.. AR2 2020 10 15 11 30 28 19.5362 -155.5763 3437.00 3397.00 40.00 480646 MLO 2020 09 22 19 46 00 4393-99 S co CCGG 87.040 -999.990 S.. AR2 2020 10 15 11 44 44 19.5362 -155.5763 3437.00 3397.00 40.00 480647 MLO 2020 09 22 20 06 00 4767-99 P co CCGG 93.000 -999.990 ... AR2 2020 10 15 11 59 00 19.5362 -155.5763 3402.00 3397.00 5.00 480644 MLO 2020 09 22 20 06 00 5293-99 P co CCGG 91.900 -999.990 ... AR2 2020 10 15 12 13 18 19.5362 -155.5763 3402.00 3397.00 5.00 480645 MLO 2020 09 29 19 52 00 4142-99 S co CCGG 73.030 -999.990 S.. AR2 2020 10 16 14 09 36 19.5362 -155.5763 3437.00 3397.00 40.00 480750 MLO 2020 09 29 19 52 00 4765-99 S co CCGG 72.560 -999.990 S.. AR2 2020 10 16 14 23 53 19.5362 -155.5763 3437.00 3397.00 40.00 480751 MLO 2020 09 29 20 18 00 1146-99 P co CCGG 81.200 -999.990 ... AR2 2020 10 16 13 41 01 19.5362 -155.5763 3402.00 3397.00 5.00 480748 MLO 2020 09 29 20 18 00 2706-99 P co CCGG 80.470 -999.990 ... AR2 2020 10 16 13 55 18 19.5362 -155.5763 3402.00 3397.00 5.00 480749 MLO 2020 10 06 19 41 00 212-99 S co CCGG 75.790 -999.990 S.. AR2 2020 10 22 16 57 22 19.5362 -155.5763 3437.00 3397.00 40.00 481047 MLO 2020 10 06 19 41 00 4324-99 S co CCGG 74.880 -999.990 S.. AR2 2020 10 22 17 11 38 19.5362 -155.5763 3437.00 3397.00 40.00 481048 MLO 2020 10 06 20 01 00 5115-99 P co CCGG 78.440 -999.990 ... AR2 2020 10 22 17 25 55 19.5362 -155.5763 3402.00 3397.00 5.00 481049 MLO 2020 10 06 20 01 00 5558-99 P co CCGG 77.530 -999.990 ... AR2 2020 10 22 17 40 11 19.5362 -155.5763 3402.00 3397.00 5.00 481050 MLO 2020 10 13 20 00 00 67-99 S co CCGG 83.370 -999.990 S.. AR2 2020 10 30 13 24 13 19.5362 -155.5763 3437.00 3397.00 40.00 481273 MLO 2020 10 13 20 00 00 68-99 S co CCGG 83.550 -999.990 S.. AR2 2020 10 30 13 38 33 19.5362 -155.5763 3437.00 3397.00 40.00 481274 MLO 2020 10 13 20 20 00 5035-99 P co CCGG 87.120 -999.990 ... AR2 2020 10 30 11 00 27 19.5362 -155.5763 3402.00 3397.00 5.00 481271 MLO 2020 10 13 20 20 00 5036-99 P co CCGG 86.310 -999.990 ... AR2 2020 10 30 11 14 43 19.5362 -155.5763 3402.00 3397.00 5.00 481272 MLO 2020 10 20 20 08 00 4813-99 S co CCGG 76.000 -999.990 S.. AR2 2020 11 06 12 27 24 19.5362 -155.5763 3437.00 3397.00 40.00 481866 MLO 2020 10 20 20 08 00 4928-99 S co CCGG 75.840 -999.990 S.. AR2 2020 11 06 12 41 40 19.5362 -155.5763 3437.00 3397.00 40.00 481867 MLO 2020 10 20 20 26 00 1029-99 P co CCGG 79.430 -999.990 ... AR2 2020 11 06 12 55 56 19.5362 -155.5763 3402.00 3397.00 5.00 481864 MLO 2020 10 20 20 26 00 5742-99 P co CCGG 78.890 -999.990 ... AR2 2020 11 06 13 10 12 19.5362 -155.5763 3402.00 3397.00 5.00 481865 MLO 2020 10 29 20 12 00 1839-99 S co CCGG 84.540 -999.990 S.. AR2 2020 11 16 14 25 45 19.5362 -155.5763 3437.00 3397.00 40.00 482077 MLO 2020 10 29 20 12 00 235-99 S co CCGG 84.390 -999.990 S.. AR2 2020 11 16 14 11 29 19.5362 -155.5763 3437.00 3397.00 40.00 482076 MLO 2020 10 29 20 38 00 5732-99 P co CCGG 85.850 -999.990 ... AR2 2020 11 16 14 40 02 19.5362 -155.5763 3402.00 3397.00 5.00 482074 MLO 2020 10 29 20 38 00 5764-99 P co CCGG 85.230 -999.990 ... AR2 2020 11 16 14 54 18 19.5362 -155.5763 3402.00 3397.00 5.00 482075 MLO 2020 11 03 19 40 00 1928-99 S co CCGG 74.030 -999.990 S.. AR2 2020 11 19 11 56 15 19.5362 -155.5763 3437.00 3397.00 40.00 482341 MLO 2020 11 03 19 40 00 4192-99 S co CCGG 74.270 -999.990 S.. AR2 2020 11 19 12 10 30 19.5362 -155.5763 3437.00 3397.00 40.00 482342 MLO 2020 11 03 19 59 00 217-99 P co CCGG 75.910 -999.990 ... AR2 2020 11 19 11 27 43 19.5362 -155.5763 3402.00 3397.00 5.00 482339 MLO 2020 11 03 19 59 00 5708-99 P co CCGG 74.950 -999.990 ... AR2 2020 11 19 11 41 59 19.5362 -155.5763 3402.00 3397.00 5.00 482340 MLO 2020 11 13 20 04 00 345-99 S co CCGG 90.210 -999.990 S.. AR2 2020 12 02 13 51 09 19.5362 -155.5763 3437.00 3397.00 40.00 482718 MLO 2020 11 13 20 04 00 481-99 S co CCGG 88.880 -999.990 S.. AR2 2020 12 02 14 05 25 19.5362 -155.5763 3437.00 3397.00 40.00 482719 MLO 2020 11 13 20 23 00 2021-99 P co CCGG 89.110 -999.990 ... AR2 2020 12 02 14 19 42 19.5362 -155.5763 3437.00 3397.00 40.00 482720 MLO 2020 11 13 20 23 00 5836-99 P co CCGG 88.740 -999.990 ... AR2 2020 12 02 14 33 57 19.5362 -155.5763 3437.00 3397.00 40.00 482721 MLO 2020 11 17 19 03 00 4800-99 S co CCGG 74.810 -999.990 S.. AR2 2020 12 03 10 21 51 19.5362 -155.5763 3437.00 3397.00 40.00 482690 MLO 2020 11 17 19 03 00 5342-99 S co CCGG 74.240 -999.990 S.. AR2 2020 12 03 10 36 08 19.5362 -155.5763 3437.00 3397.00 40.00 482691 MLO 2020 11 17 19 27 00 1697-99 P co CCGG 75.620 -999.990 ... AR2 2020 12 03 13 41 50 19.5362 -155.5763 3402.00 3397.00 5.00 482681 MLO 2020 11 17 19 27 00 5489-99 P co CCGG 74.880 -999.990 ... AR2 2020 12 03 13 56 07 19.5362 -155.5763 3402.00 3397.00 5.00 482682 MLO 2020 11 24 20 20 00 3190-99 S co CCGG 87.640 -999.990 S.. AR2 2020 12 07 10 35 42 19.5362 -155.5763 3437.00 3397.00 40.00 482786 MLO 2020 11 24 20 20 00 4921-99 S co CCGG 87.130 -999.990 S.. AR2 2020 12 07 10 50 03 19.5362 -155.5763 3437.00 3397.00 40.00 482787 MLO 2020 11 24 20 43 00 779-99 P co CCGG 89.550 -999.990 ... AR2 2020 12 07 10 21 21 19.5362 -155.5763 3402.00 3397.00 5.00 482789 MLO 2020 11 24 20 43 00 99-99 P co CCGG 90.210 -999.990 ... AR2 2020 12 07 10 07 00 19.5362 -155.5763 3402.00 3397.00 5.00 482788 MLO 2020 12 01 19 13 00 1023-99 S co CCGG 89.150 -999.990 S.. AR2 2020 12 11 08 41 36 19.5362 -155.5763 3437.00 3397.00 40.00 483178 MLO 2020 12 01 19 13 00 1921-99 S co CCGG 88.800 -999.990 S.. AR2 2020 12 11 08 55 58 19.5362 -155.5763 3437.00 3397.00 40.00 483179 MLO 2020 12 01 19 19 00 2370-99 P co CCGG 91.210 -999.990 ... AR2 2020 12 11 09 24 31 19.5362 -155.5763 3402.00 3397.00 5.00 483177 MLO 2020 12 01 19 19 00 604-99 P co CCGG 92.570 -999.990 ... AR2 2020 12 11 09 10 15 19.5362 -155.5763 3402.00 3397.00 5.00 483176 MLO 2020 12 08 20 05 00 2800-99 S co CCGG 72.350 -999.990 S.. AR2 2020 12 29 16 07 16 19.5362 -155.5763 3437.00 3397.00 40.00 483777 MLO 2020 12 08 20 05 00 5265-99 S co CCGG 71.810 -999.990 S.. AR2 2020 12 29 16 21 34 19.5362 -155.5763 3437.00 3397.00 40.00 483778 MLO 2020 12 08 20 24 00 2597-99 P co CCGG 72.520 -999.990 ... AR2 2020 12 30 10 51 30 19.5362 -155.5763 3402.00 3397.00 5.00 483781 MLO 2020 12 08 20 24 00 5513-99 P co CCGG 71.560 -999.990 ... AR2 2020 12 30 11 05 46 19.5362 -155.5763 3402.00 3397.00 5.00 483782 MLO 2020 12 15 20 00 00 2741-99 S co CCGG 78.500 -999.990 S.. AR2 2020 12 29 15 38 40 19.5362 -155.5763 3437.00 3397.00 40.00 483775 MLO 2020 12 15 20 00 00 4755-99 S co CCGG 75.970 -999.990 S.. AR2 2020 12 29 15 52 58 19.5362 -155.5763 3437.00 3397.00 40.00 483776 MLO 2020 12 15 20 21 00 1369-99 P co CCGG 76.890 -999.990 ... AR2 2020 12 29 15 10 05 19.5362 -155.5763 3402.00 3397.00 5.00 483779 MLO 2020 12 15 20 21 00 4604-99 P co CCGG 76.890 -999.990 ... AR2 2020 12 29 15 24 22 19.5362 -155.5763 3402.00 3397.00 5.00 483780 MLO 2020 12 22 20 07 00 2693-99 S co CCGG 92.040 -999.990 S.. AR2 2021 01 13 10 37 18 19.5362 -155.5763 3437.00 3397.00 40.00 484252 MLO 2020 12 22 20 07 00 3848-99 S co CCGG 92.150 -999.990 S.. AR2 2021 01 13 10 51 35 19.5362 -155.5763 3437.00 3397.00 40.00 484253 MLO 2020 12 22 20 24 00 2212-99 P co CCGG 93.190 -999.990 ... AR2 2021 01 13 11 05 52 19.5362 -155.5763 3402.00 3397.00 5.00 484254 MLO 2020 12 22 20 24 00 4805-99 P co CCGG 93.100 -999.990 ... AR2 2021 01 13 11 20 10 19.5362 -155.5763 3402.00 3397.00 5.00 484255 MLO 2020 12 31 18 40 00 1645-99 S co CCGG 92.980 -999.990 S.. AR2 2021 01 28 12 32 51 19.5362 -155.5763 3437.00 3397.00 40.00 484817 MLO 2020 12 31 18 40 00 4170-99 S co CCGG 93.100 -999.990 S.. AR2 2021 01 28 12 47 08 19.5362 -155.5763 3437.00 3397.00 40.00 484818 MLO 2020 12 31 19 17 00 4180-99 P co CCGG 95.370 -999.990 ... AR2 2021 01 28 12 04 16 19.5362 -155.5763 3402.00 3397.00 5.00 484815 MLO 2020 12 31 19 17 00 5333-99 P co CCGG 95.290 -999.990 ... AR2 2021 01 28 12 18 33 19.5362 -155.5763 3402.00 3397.00 5.00 484816