# number_of_header_lines: 97 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO CCGG (Individual Flasks) # contact_name: Gabrielle Petron # contact_telephone: (303) 497-4890 # contact_email: Gabrielle.Petron@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Lawrence Berkeley National Laboratory [LBNL] # collaborator_url: http://esd.lbl.gov/about/staff/sebastienbiraud/ # collaborator_comment: SGP Principal Investigator: # collaborator_comment: Sebastien C. Biraud, Research Scientist # collaborator_comment: Atmospheric Science Dept. # collaborator_comment: Lawrence Berkeley National Laboratory # collaborator_comment: MS 84R0171 # collaborator_comment: 1 Cyclotron Road # collaborator_comment: Berkeley, CA 94720 # collaborator_comment: # collaborator_comment: SCBiraud@lbl.gov email # collaborator_comment: phone 510-486-6084 # collaborator_comment: fax 510-486-7775 # collaborator_comment: # collaborator_comment: If the data are obtained for potential use # collaborator_comment: in a publication or presentation, LBNL and # collaborator_comment: NOAA should be informed at the outset of # collaborator_comment: the nature of this work. If the LBNL-NOAA # collaborator_comment: data are essential to the work, or if an # collaborator_comment: important result or conclusion depends on # collaborator_comment: the LBNL-NOAA data, co-authorship may be # collaborator_comment: appropriate. This should be discussed at # collaborator_comment: an early stage in the work. Manuscripts # collaborator_comment: using the LBNL-NOAA data should be sent # collaborator_comment: to LBNL and NOAA for review before they # collaborator_comment: are submitted for publication so we can # collaborator_comment: insure that the quality and limitations # collaborator_comment: of the data are accurately represented. # collaborator_comment: # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: sgp # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2020-12-31 # description_creation-time: 2021-07-29 08:19:15 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number SGP 2002 04 02 21 15 00 551-91 D co CCGG 164.760 -999.990 ... R5 2002 04 09 09 19 00 36.6200 -97.4800 374.00 314.00 60.00 115605 SGP 2002 04 02 21 15 00 552-91 D co CCGG 165.200 -999.990 ... R5 2002 04 09 09 33 00 36.6200 -97.4800 374.00 314.00 60.00 115606 SGP 2002 04 02 22 11 00 723-91 D co CCGG 162.870 -999.990 ... R5 2002 04 09 09 46 00 36.6200 -97.4800 374.00 314.00 60.00 115607 SGP 2002 04 02 22 11 00 724-91 D co CCGG 164.200 -999.990 ... R5 2002 04 09 09 59 00 36.6200 -97.4800 374.00 314.00 60.00 115608 SGP 2002 05 20 16 55 00 897-91 D co CCGG 154.400 -999.990 ... R5 2002 06 03 11 53 00 36.6200 -97.4800 374.00 314.00 60.00 115609 SGP 2002 05 20 16 55 00 898-91 D co CCGG 155.950 -999.990 ... R5 2002 06 03 12 06 00 36.6200 -97.4800 374.00 314.00 60.00 115610 SGP 2002 05 21 20 30 00 363-91 D co CCGG 171.030 -999.990 ... R5 2002 06 03 12 19 00 36.6200 -97.4800 374.00 314.00 60.00 115611 SGP 2002 05 21 20 30 00 364-91 D co CCGG 171.140 -999.990 ... R5 2002 06 03 12 32 00 36.6200 -97.4800 374.00 314.00 60.00 115612 SGP 2002 05 30 19 54 00 1435-91 D co CCGG 156.370 -999.990 ... R5 2002 06 12 15 50 00 36.6200 -97.4800 374.00 314.00 60.00 115613 SGP 2002 05 30 19 54 00 1436-91 D co CCGG 155.000 -999.990 ... R5 2002 06 12 16 03 00 36.6200 -97.4800 374.00 314.00 60.00 115614 SGP 2002 06 06 20 07 00 517-99 D co CCGG 157.710 -999.990 ... R5 2002 06 12 15 24 00 36.6200 -97.4800 374.00 314.00 60.00 115615 SGP 2002 06 06 20 07 00 518-99 D co CCGG 156.680 -999.990 ... R5 2002 06 12 15 37 00 36.6200 -97.4800 374.00 314.00 60.00 115616 SGP 2002 06 13 20 21 00 639-99 D co CCGG 135.970 -999.990 ... R5 2002 07 02 09 03 00 36.6200 -97.4800 374.00 314.00 60.00 115617 SGP 2002 06 13 20 21 00 640-99 D co CCGG 135.550 -999.990 ... R5 2002 07 02 09 16 00 36.6200 -97.4800 374.00 314.00 60.00 115618 SGP 2002 06 20 19 25 00 641-99 D co CCGG 144.360 -999.990 ... R5 2002 07 02 09 29 00 36.6200 -97.4800 374.00 314.00 60.00 115619 SGP 2002 06 20 19 25 00 642-99 D co CCGG 144.650 -999.990 ... R5 2002 07 02 09 42 00 36.6200 -97.4800 374.00 314.00 60.00 115620 SGP 2002 06 27 19 05 00 4479-91 D co CCGG 156.900 -999.990 ... R5 2002 07 18 12 15 00 36.6200 -97.4800 374.00 314.00 60.00 115621 SGP 2002 06 27 19 05 00 4480-91 D co CCGG 155.790 -999.990 ... R5 2002 07 18 12 28 00 36.6200 -97.4800 374.00 314.00 60.00 115622 SGP 2002 07 11 19 38 00 643-99 D co CCGG 111.460 -999.990 ... R5 2002 07 18 12 41 00 36.6200 -97.4800 374.00 314.00 60.00 115623 SGP 2002 07 11 19 38 00 644-99 D co CCGG 110.650 -999.990 ... R5 2002 07 18 12 54 00 36.6200 -97.4800 374.00 314.00 60.00 115624 SGP 2002 07 18 19 00 00 145-91 D co CCGG 105.380 -999.990 P.. R5 2002 08 01 10 04 00 36.6200 -97.4800 374.00 314.00 60.00 115625 SGP 2002 07 18 19 00 00 146-91 D co CCGG 101.960 -999.990 P.. R5 2002 08 01 10 18 00 36.6200 -97.4800 374.00 314.00 60.00 115626 SGP 2002 07 25 20 49 00 4117-91 D co CCGG 166.750 -999.990 ... R5 2002 08 01 09 38 00 36.6200 -97.4800 374.00 314.00 60.00 115627 SGP 2002 07 25 20 49 00 4118-91 D co CCGG 166.750 -999.990 ... R5 2002 08 01 09 51 00 36.6200 -97.4800 374.00 314.00 60.00 115628 SGP 2002 08 05 21 20 00 1243-91 D co CCGG 186.420 -999.990 ... R5 2002 08 21 13 22 00 36.6200 -97.4800 339.00 314.00 25.00 115629 SGP 2002 08 08 20 03 00 177-91 D co CCGG 193.820 -999.990 ... R5 2002 08 21 10 44 00 36.6200 -97.4800 339.00 314.00 25.00 115630 SGP 2002 08 08 20 03 00 178-91 D co CCGG 194.850 -999.990 ... R5 2002 08 21 10 57 00 36.6200 -97.4800 339.00 314.00 25.00 115631 SGP 2002 08 15 19 34 00 643-99 D co CCGG 125.540 -999.990 ... R5 2002 08 27 15 49 00 36.6200 -97.4800 339.00 314.00 25.00 115632 SGP 2002 08 15 19 34 00 644-99 D co CCGG 125.670 -999.990 ... R5 2002 08 27 16 02 00 36.6200 -97.4800 339.00 314.00 25.00 115633 SGP 2002 08 22 19 45 00 393-91 D co CCGG 96.860 -999.990 .X. R5 2002 08 27 16 15 00 36.6200 -97.4800 374.00 314.00 60.00 115634 SGP 2002 08 22 19 45 00 394-91 D co CCGG 96.280 -999.990 .X. R5 2002 08 27 16 28 00 36.6200 -97.4800 374.00 314.00 60.00 115635 SGP 2002 08 29 19 31 00 885-91 D co CCGG 180.750 -999.990 ... R5 2002 09 19 13 02 00 36.6200 -97.4800 374.00 314.00 60.00 115636 SGP 2002 08 29 19 31 00 886-91 D co CCGG 182.650 -999.990 ... R5 2002 09 19 13 15 00 36.6200 -97.4800 374.00 314.00 60.00 115637 SGP 2002 09 12 19 28 00 4103-91 D co CCGG 145.260 -999.990 ... R5 2002 09 19 12 36 00 36.6200 -97.4800 374.00 314.00 60.00 115638 SGP 2002 09 19 19 50 00 239-99 D co CCGG 135.440 -999.990 ... R5 2002 10 07 09 33 00 36.6200 -97.4800 374.00 314.00 60.00 115643 SGP 2002 09 19 19 50 00 240-99 D co CCGG 135.180 -999.990 ... R5 2002 10 07 09 46 00 36.6200 -97.4800 374.00 314.00 60.00 115644 SGP 2002 09 26 19 34 00 159-99 D co CCGG 155.540 -999.990 ... R5 2002 10 07 09 59 00 36.6200 -97.4800 374.00 314.00 60.00 115645 SGP 2002 09 26 19 34 00 160-99 D co CCGG 155.610 -999.990 ... R5 2002 10 07 10 12 00 36.6200 -97.4800 374.00 314.00 60.00 115646 SGP 2002 10 03 19 38 00 165-99 D co CCGG 139.870 -999.990 ... R5 2002 10 22 14 51 00 36.6200 -97.4800 374.00 314.00 60.00 115647 SGP 2002 10 03 19 38 00 166-99 D co CCGG 138.300 -999.990 ... R5 2002 10 22 15 04 00 36.6200 -97.4800 374.00 314.00 60.00 115648 SGP 2002 10 10 19 40 00 4411-91 D co CCGG 150.700 -999.990 ... R5 2002 10 22 16 11 00 36.6200 -97.4800 374.00 314.00 60.00 115649 SGP 2002 10 10 19 40 00 4412-91 D co CCGG 150.270 -999.990 ... R5 2002 10 22 16 24 00 36.6200 -97.4800 374.00 314.00 60.00 115650 SGP 2002 10 17 19 45 00 453-99 D co CCGG 153.530 -999.990 ... R5 2002 10 29 13 54 00 36.6200 -97.4800 374.00 314.00 60.00 115653 SGP 2002 10 17 19 45 00 454-99 D co CCGG 152.800 -999.990 ... R5 2002 10 29 14 08 00 36.6200 -97.4800 374.00 314.00 60.00 115654 SGP 2002 10 24 19 30 00 4743-91 D co CCGG 169.870 -999.990 ... R5 2002 10 29 12 36 00 36.6200 -97.4800 374.00 314.00 60.00 115655 SGP 2002 10 24 19 30 00 4744-91 D co CCGG 168.860 -999.990 ... R5 2002 10 29 12 49 00 36.6200 -97.4800 374.00 314.00 60.00 115656 SGP 2002 10 31 22 13 00 677-99 D co CCGG 162.280 -999.990 ... R5 2002 11 15 09 11 00 36.6200 -97.4800 374.00 314.00 60.00 115657 SGP 2002 10 31 22 13 00 678-99 D co CCGG 161.630 -999.990 ... R5 2002 11 15 09 24 00 36.6200 -97.4800 374.00 314.00 60.00 115658 SGP 2002 11 07 20 47 00 571-99 D co CCGG 131.850 -999.990 ... R5 2002 11 15 08 45 00 36.6200 -97.4800 374.00 314.00 60.00 115659 SGP 2002 11 07 20 47 00 572-99 D co CCGG 131.310 -999.990 ... R5 2002 11 15 08 58 00 36.6200 -97.4800 374.00 314.00 60.00 115660 SGP 2002 11 14 20 30 00 619-99 D co CCGG 183.940 -999.990 ... R5 2002 11 27 12 27 00 36.6200 -97.4800 374.00 314.00 60.00 115661 SGP 2002 11 14 20 30 00 620-99 D co CCGG 186.490 -999.990 ... R5 2002 11 27 12 40 00 36.6200 -97.4800 374.00 314.00 60.00 115662 SGP 2002 11 21 20 36 00 701-99 D co CCGG 141.930 -999.990 ... R5 2002 11 27 12 53 00 36.6200 -97.4800 374.00 314.00 60.00 115665 SGP 2002 11 21 20 36 00 702-99 D co CCGG 140.810 -999.990 ... R5 2002 11 27 13 06 00 36.6200 -97.4800 374.00 314.00 60.00 115666 SGP 2002 11 28 21 27 00 1267-91 D co CCGG 145.800 -999.990 ... R5 2003 01 08 15 50 00 36.6200 -97.4800 374.00 314.00 60.00 115667 SGP 2002 11 28 21 27 00 1268-91 D co CCGG 145.990 -999.990 ... R5 2003 01 08 16 03 00 36.6200 -97.4800 374.00 314.00 60.00 115668 SGP 2002 12 05 21 33 00 1039-91 D co CCGG 180.290 -999.990 ... R5 2003 01 09 11 03 00 36.6200 -97.4800 374.00 314.00 60.00 115669 SGP 2002 12 05 21 33 00 1040-91 D co CCGG 180.840 -999.990 ... R5 2003 01 09 11 16 00 36.6200 -97.4800 374.00 314.00 60.00 115670 SGP 2002 12 13 20 59 00 65-99 D co CCGG 148.230 -999.990 ... R5 2003 01 08 15 24 00 36.6200 -97.4800 374.00 314.00 60.00 115671 SGP 2002 12 13 20 59 00 66-99 D co CCGG 148.170 -999.990 ... R5 2003 01 08 15 37 00 36.6200 -97.4800 374.00 314.00 60.00 115672 SGP 2002 12 19 19 40 00 689-91 D co CCGG 150.710 -999.990 ... R5 2003 01 08 14 58 00 36.6200 -97.4800 374.00 314.00 60.00 115673 SGP 2002 12 19 19 40 00 690-91 D co CCGG 150.990 -999.990 ... R5 2003 01 08 15 11 00 36.6200 -97.4800 374.00 314.00 60.00 115674 SGP 2002 12 26 21 17 00 439-99 D co CCGG 214.500 -999.990 ... R5 2003 01 10 13 09 00 36.6200 -97.4800 374.00 314.00 60.00 115675 SGP 2002 12 26 21 17 00 440-99 D co CCGG 213.690 -999.990 ... R5 2003 01 10 13 22 00 36.6200 -97.4800 374.00 314.00 60.00 115676 SGP 2003 01 02 21 04 00 1493-91 D co CCGG 163.940 -999.990 ... R5 2003 01 10 13 35 00 36.6200 -97.4800 374.00 314.00 60.00 115677 SGP 2003 01 02 21 04 00 1494-91 D co CCGG 164.400 -999.990 ... R5 2003 01 10 13 48 00 36.6200 -97.4800 374.00 314.00 60.00 115678 SGP 2003 01 23 19 11 00 295-99 D co CCGG 185.350 -999.990 ... R5 2003 02 06 11 05 00 36.6200 -97.4800 374.00 314.00 60.00 115679 SGP 2003 01 23 19 11 00 296-99 D co CCGG 186.510 -999.990 ... R5 2003 02 06 11 18 00 36.6200 -97.4800 374.00 314.00 60.00 115680 SGP 2003 01 30 20 01 00 333-91 D co CCGG 333.120 -999.990 .NC R5 2003 02 05 17 11 00 36.6200 -97.4800 374.00 314.00 60.00 115681 SGP 2003 01 30 20 01 00 334-91 D co CCGG 333.300 -999.990 .NC R5 2003 02 05 17 24 00 36.6200 -97.4800 374.00 314.00 60.00 115682 SGP 2003 02 06 20 49 00 1583-91 D co CCGG 179.340 -999.990 ... R5 2003 02 24 09 44 00 36.6200 -97.4800 374.00 314.00 60.00 115683 SGP 2003 02 06 20 49 00 1584-91 D co CCGG 179.410 -999.990 ... R5 2003 02 24 09 57 00 36.6200 -97.4800 374.00 314.00 60.00 115684 SGP 2003 02 13 20 34 00 495-91 D co CCGG 232.420 -999.990 ..C R5 2003 02 24 11 03 00 36.6200 -97.4800 374.00 314.00 60.00 115685 SGP 2003 02 13 20 34 00 496-91 D co CCGG 231.080 -999.990 ..C R5 2003 02 24 11 16 00 36.6200 -97.4800 374.00 314.00 60.00 115686 SGP 2003 02 20 22 00 00 909-99 D co CCGG 165.350 -999.990 ... R5 2003 03 12 14 26 00 36.6200 -97.4800 374.00 314.00 60.00 115687 SGP 2003 02 20 22 00 00 910-99 D co CCGG 165.410 -999.990 ... R5 2003 03 12 14 39 00 36.6200 -97.4800 374.00 314.00 60.00 115688 SGP 2003 02 27 20 28 00 4203-91 D co CCGG 207.000 -999.990 ... R5 2003 03 12 14 52 00 36.6200 -97.4800 374.00 314.00 60.00 115689 SGP 2003 02 27 20 28 00 4204-91 D co CCGG 207.560 -999.990 ... R5 2003 03 12 15 05 00 36.6200 -97.4800 374.00 314.00 60.00 115690 SGP 2003 03 06 22 02 00 891-99 D co CCGG 201.040 -999.990 ... R5 2003 03 26 12 55 00 36.6200 -97.4800 374.00 314.00 60.00 115695 SGP 2003 03 06 22 02 00 892-99 D co CCGG 200.600 -999.990 ... R5 2003 03 26 13 08 00 36.6200 -97.4800 374.00 314.00 60.00 115696 SGP 2003 03 13 20 21 00 893-99 D co CCGG 207.690 -999.990 ... R5 2003 03 26 12 29 00 36.6200 -97.4800 374.00 314.00 60.00 115699 SGP 2003 03 13 20 21 00 894-99 D co CCGG 204.970 -999.990 ... R5 2003 03 26 12 42 00 36.6200 -97.4800 374.00 314.00 60.00 115700 SGP 2003 03 20 20 55 00 827-99 D co CCGG 192.240 -999.990 ... R5 2003 04 03 16 25 00 36.6200 -97.4800 374.00 314.00 60.00 115705 SGP 2003 03 20 20 55 00 828-99 D co CCGG 191.010 -999.990 ... R5 2003 04 03 16 38 00 36.6200 -97.4800 374.00 314.00 60.00 115706 SGP 2003 03 27 20 40 00 829-99 D co CCGG 163.300 -999.990 ... R5 2003 04 03 15 59 00 36.6200 -97.4800 374.00 314.00 60.00 115715 SGP 2003 03 27 20 40 00 830-99 D co CCGG 163.880 -999.990 ... R5 2003 04 03 16 12 00 36.6200 -97.4800 374.00 314.00 60.00 115716 SGP 2003 04 03 21 55 00 1237-99 D co CCGG 159.460 -999.990 ... R5 2003 04 17 14 28 00 36.6200 -97.4800 374.00 314.00 60.00 115725 SGP 2003 04 03 21 55 00 1238-99 D co CCGG 158.280 -999.990 ... R5 2003 04 17 14 41 00 36.6200 -97.4800 374.00 314.00 60.00 115726 SGP 2003 04 10 19 30 00 419-99 D co CCGG 203.950 -999.990 ... R5 2003 04 17 15 48 00 36.6200 -97.4800 374.00 314.00 60.00 115737 SGP 2003 04 10 19 30 00 420-99 D co CCGG 206.460 -999.990 ... R5 2003 04 17 16 01 00 36.6200 -97.4800 374.00 314.00 60.00 115738 SGP 2003 04 17 18 40 00 4731-91 D co CCGG 167.960 -999.990 ... R5 2003 05 14 15 15 00 36.6200 -97.4800 374.00 314.00 60.00 115751 SGP 2003 04 17 18 40 00 4732-91 D co CCGG 169.250 -999.990 ... R5 2003 05 14 15 28 00 36.6200 -97.4800 374.00 314.00 60.00 115752 SGP 2003 04 24 19 20 00 699-91 D co CCGG 162.520 -999.990 ... R5 2003 05 14 15 43 00 36.6200 -97.4800 374.00 314.00 60.00 115765 SGP 2003 04 24 19 20 00 700-91 D co CCGG 163.930 -999.990 ... R5 2003 05 14 15 56 00 36.6200 -97.4800 374.00 314.00 60.00 115766 SGP 2003 05 01 19 15 00 100-91 D co CCGG 208.680 -999.990 ... R5 2003 05 27 16 06 00 36.6200 -97.4800 374.00 314.00 60.00 115774 SGP 2003 05 01 19 15 00 99-91 D co CCGG 209.920 -999.990 ... R5 2003 05 27 15 53 00 36.6200 -97.4800 374.00 314.00 60.00 115773 SGP 2003 05 08 19 10 00 4097-91 D co CCGG 390.850 -999.990 .XC R5 2003 05 27 15 27 00 36.6200 -97.4800 374.00 314.00 60.00 115785 SGP 2003 05 08 19 10 00 4098-91 D co CCGG 390.540 -999.990 .XC R5 2003 05 27 15 40 00 36.6200 -97.4800 374.00 314.00 60.00 115786 SGP 2003 05 15 19 30 00 1357-99 D co CCGG 166.970 -999.990 ... R5 2003 06 05 11 58 00 36.6200 -97.4800 374.00 314.00 60.00 115795 SGP 2003 05 15 19 30 00 1358-99 D co CCGG 167.110 -999.990 ... R5 2003 06 05 12 11 00 36.6200 -97.4800 374.00 314.00 60.00 115796 SGP 2003 05 22 17 35 00 1355-99 D co CCGG 184.780 -999.990 ... R5 2003 06 05 12 24 00 36.6200 -97.4800 374.00 314.00 60.00 115809 SGP 2003 05 22 17 35 00 1356-99 D co CCGG 186.250 -999.990 ... R5 2003 06 05 12 37 00 36.6200 -97.4800 374.00 314.00 60.00 115810 SGP 2003 05 27 19 41 00 1345-99 D co CCGG 181.010 -999.990 ... R5 2003 06 18 15 26 00 36.6200 -97.4800 374.00 314.00 60.00 115817 SGP 2003 05 27 19 41 00 1346-99 D co CCGG 180.320 -999.990 ... R5 2003 06 18 15 39 00 36.6200 -97.4800 374.00 314.00 60.00 115818 SGP 2003 05 29 19 31 00 1343-99 D co CCGG 164.960 -999.990 ... R5 2003 06 18 14 08 00 36.6200 -97.4800 374.00 314.00 60.00 115821 SGP 2003 05 29 19 31 00 1344-99 D co CCGG 165.100 -999.990 ... R5 2003 06 18 14 21 00 36.6200 -97.4800 374.00 314.00 60.00 115822 SGP 2003 06 02 19 54 00 127-91 D co CCGG 172.320 -999.990 ... R5 2003 06 17 15 29 00 36.6200 -97.4800 374.00 314.00 60.00 115827 SGP 2003 06 02 19 54 00 128-91 D co CCGG 172.110 -999.990 ... R5 2003 06 17 15 42 00 36.6200 -97.4800 374.00 314.00 60.00 115828 SGP 2003 06 05 19 43 00 1769-91 D co CCGG 239.190 -999.990 .XC R5 2003 06 17 14 11 00 36.6200 -97.4800 374.00 314.00 60.00 115829 SGP 2003 06 05 19 43 00 1770-91 D co CCGG 238.960 -999.990 .XC R5 2003 06 17 14 24 00 36.6200 -97.4800 374.00 314.00 60.00 115830 SGP 2003 06 09 19 35 00 4517-91 D co CCGG 224.300 -999.990 .X. R5 2003 06 24 13 12 00 36.6200 -97.4800 374.00 314.00 60.00 115837 SGP 2003 06 09 19 35 00 4518-91 D co CCGG 222.070 -999.990 .X. R5 2003 06 24 13 25 00 36.6200 -97.4800 374.00 314.00 60.00 115838 SGP 2003 06 12 22 23 00 981-91 D co CCGG 119.350 -999.990 ... R5 2003 06 24 12 46 00 36.6200 -97.4800 374.00 314.00 60.00 115847 SGP 2003 06 12 22 23 00 982-91 D co CCGG 118.690 -999.990 ... R5 2003 06 24 12 59 00 36.6200 -97.4800 374.00 314.00 60.00 115848 SGP 2003 06 16 20 55 00 1463-91 D co CCGG 178.620 -999.990 P.. R5 2003 07 02 09 17 00 36.6200 -97.4800 374.00 314.00 60.00 115857 SGP 2003 06 16 20 55 00 1464-91 D co CCGG 179.400 -999.990 P.. R5 2003 07 02 09 30 00 36.6200 -97.4800 374.00 314.00 60.00 115858 SGP 2003 06 19 19 18 00 67-91 D co CCGG 190.710 -999.990 ... R5 2003 07 02 08 51 00 36.6200 -97.4800 374.00 314.00 60.00 115863 SGP 2003 06 19 19 18 00 68-91 D co CCGG 190.820 -999.990 ... R5 2003 07 02 09 04 00 36.6200 -97.4800 374.00 314.00 60.00 115864 SGP 2003 06 23 19 35 00 1551-99 D co CCGG 125.630 -999.990 ... R5 2003 07 03 11 25 00 36.6200 -97.4800 374.00 314.00 60.00 115870 SGP 2003 06 23 19 35 00 1552-99 D co CCGG 127.130 -999.990 ... R5 2003 07 03 11 38 00 36.6200 -97.4800 374.00 314.00 60.00 115871 SGP 2003 06 26 19 05 00 1553-99 D co CCGG 135.910 -999.990 ... R5 2003 07 03 10 05 00 36.6200 -97.4800 374.00 314.00 60.00 115876 SGP 2003 06 26 19 05 00 1554-99 D co CCGG 135.210 -999.990 ... R5 2003 07 03 10 18 00 36.6200 -97.4800 374.00 314.00 60.00 115877 SGP 2003 07 03 19 59 00 1555-99 D co CCGG 184.700 -999.990 P.. R5 2003 07 23 09 15 00 36.6200 -97.4800 374.00 314.00 60.00 115882 SGP 2003 07 03 19 59 00 1556-99 D co CCGG 180.570 -999.990 P.. R5 2003 07 23 09 28 00 36.6200 -97.4800 374.00 314.00 60.00 115883 SGP 2003 07 10 19 20 00 1557-99 D co CCGG 135.750 -999.990 ... R5 2003 07 22 16 49 00 36.6200 -97.4800 374.00 314.00 60.00 115896 SGP 2003 07 10 19 20 00 1558-99 D co CCGG 136.310 -999.990 ... R5 2003 07 22 17 02 00 36.6200 -97.4800 374.00 314.00 60.00 115897 SGP 2003 07 17 18 50 00 1717-99 D co CCGG 95.480 -999.990 ... R5 2003 08 01 09 19 00 36.6200 -97.4800 374.00 314.00 60.00 115908 SGP 2003 07 17 18 50 00 1718-99 D co CCGG 95.370 -999.990 ... R5 2003 08 01 09 32 00 36.6200 -97.4800 374.00 314.00 60.00 115909 SGP 2003 07 24 18 36 00 923-99 D co CCGG 164.670 -999.990 ... R5 2003 08 13 14 20 00 36.6200 -97.4800 374.00 314.00 60.00 115916 SGP 2003 07 24 18 36 00 924-99 D co CCGG 163.770 -999.990 ... R5 2003 08 13 14 33 00 36.6200 -97.4800 374.00 314.00 60.00 115917 SGP 2003 07 31 19 39 00 4265-91 D co CCGG 162.910 -999.990 ... R5 2003 08 13 15 39 00 36.6200 -97.4800 374.00 314.00 60.00 115925 SGP 2003 07 31 19 39 00 4266-91 D co CCGG 162.800 -999.990 ... R5 2003 08 13 15 52 00 36.6200 -97.4800 374.00 314.00 60.00 115926 SGP 2003 08 07 19 22 00 4859-91 D co CCGG 193.280 -999.990 ... R5 2003 08 29 10 34 00 36.6200 -97.4800 374.00 314.00 60.00 115932 SGP 2003 08 07 19 22 00 4860-91 D co CCGG 192.080 -999.990 ... R5 2003 08 29 10 47 00 36.6200 -97.4800 374.00 314.00 60.00 115933 SGP 2003 08 21 19 00 00 509-99 D co CCGG 108.760 -999.990 ... R5 2003 08 29 10 06 00 36.6200 -97.4800 374.00 314.00 60.00 115944 SGP 2003 08 21 19 00 00 510-99 D co CCGG 108.900 -999.990 ... R5 2003 08 29 10 19 00 36.6200 -97.4800 374.00 314.00 60.00 115945 SGP 2003 08 28 19 10 00 4163-91 D co CCGG 113.770 -999.990 ... R5 2003 09 12 11 17 00 36.6200 -97.4800 374.00 314.00 60.00 115952 SGP 2003 08 28 19 10 00 4164-91 D co CCGG 114.120 -999.990 ... R5 2003 09 12 11 30 00 36.6200 -97.4800 374.00 314.00 60.00 115953 SGP 2003 09 04 19 15 00 1587-91 D co CCGG 157.330 -999.990 P.. R5 2003 09 12 11 45 00 36.6200 -97.4800 374.00 314.00 60.00 115961 SGP 2003 09 04 19 15 00 1588-91 D co CCGG 160.850 -999.990 P.. R5 2003 09 12 11 58 00 36.6200 -97.4800 374.00 314.00 60.00 115962 SGP 2003 09 11 19 10 00 4795-91 D co CCGG 168.380 -999.990 ... R5 2003 09 26 09 19 00 36.6200 -97.4800 374.00 314.00 60.00 115969 SGP 2003 09 11 19 10 00 4796-91 D co CCGG 168.350 -999.990 ... R5 2003 09 26 09 32 00 36.6200 -97.4800 374.00 314.00 60.00 115970 SGP 2003 09 18 19 01 00 4979-91 D co CCGG 125.860 -999.990 ... R5 2003 09 26 09 45 00 36.6200 -97.4800 374.00 314.00 60.00 115975 SGP 2003 09 18 19 01 00 4980-91 D co CCGG 126.460 -999.990 ... R5 2003 09 26 09 58 00 36.6200 -97.4800 374.00 314.00 60.00 115976 SGP 2003 09 25 19 05 00 1455-99 D co CCGG 139.760 -999.990 ... R5 2003 10 08 11 34 00 36.6200 -97.4800 374.00 314.00 60.00 115983 SGP 2003 09 25 19 05 00 1456-99 D co CCGG 139.910 -999.990 ... R5 2003 10 08 11 47 00 36.6200 -97.4800 374.00 314.00 60.00 115984 SGP 2003 10 02 18 45 00 1989-99 D co CCGG 160.780 -999.990 ... R5 2003 10 08 11 08 00 36.6200 -97.4800 374.00 314.00 60.00 115993 SGP 2003 10 02 18 45 00 1990-99 D co CCGG 160.800 -999.990 ... R5 2003 10 08 11 21 00 36.6200 -97.4800 374.00 314.00 60.00 115994 SGP 2003 10 09 19 43 00 1247-99 D co CCGG 147.950 -999.990 ... R5 2003 10 23 14 22 00 36.6200 -97.4800 374.00 314.00 60.00 116001 SGP 2003 10 09 19 43 00 1248-99 D co CCGG 148.900 -999.990 ... R5 2003 10 23 14 35 00 36.6200 -97.4800 374.00 314.00 60.00 116002 SGP 2003 10 16 18 45 00 381-99 D co CCGG 171.210 -999.990 ... R5 2003 10 23 14 48 00 36.6200 -97.4800 374.00 314.00 60.00 116008 SGP 2003 10 16 18 45 00 382-99 D co CCGG 170.580 -999.990 ... R5 2003 10 23 15 01 00 36.6200 -97.4800 374.00 314.00 60.00 116009 SGP 2003 10 23 19 00 00 861-99 D co CCGG 128.030 -999.990 ... R5 2003 11 10 15 12 00 36.6200 -97.4800 374.00 314.00 60.00 116016 SGP 2003 10 23 19 00 00 862-99 D co CCGG 127.410 -999.990 ... R5 2003 11 10 15 25 00 36.6200 -97.4800 374.00 314.00 60.00 116017 SGP 2003 10 30 20 01 00 1583-99 D co CCGG 141.590 -999.990 ... R5 2003 11 10 15 38 00 36.6200 -97.4800 374.00 314.00 60.00 116026 SGP 2003 10 30 20 01 00 1584-99 D co CCGG 141.320 -999.990 ... R5 2003 11 10 15 51 00 36.6200 -97.4800 374.00 314.00 60.00 116027 SGP 2003 11 07 21 00 00 4933-91 D co CCGG 154.680 -999.990 ... R5 2003 11 18 14 11 00 36.6200 -97.4800 374.00 314.00 60.00 116032 SGP 2003 11 07 21 00 00 4934-91 D co CCGG 153.990 -999.990 ... R5 2003 11 18 14 24 00 36.6200 -97.4800 374.00 314.00 60.00 116033 SGP 2003 11 13 19 21 00 4215-91 D co CCGG 150.770 -999.990 P.. R5 2003 11 26 14 59 00 36.6200 -97.4800 374.00 314.00 60.00 116040 SGP 2003 11 13 19 21 00 4216-91 D co CCGG 150.640 -999.990 P.. R5 2003 11 26 15 12 00 36.6200 -97.4800 374.00 314.00 60.00 116041 SGP 2003 11 20 20 26 00 1589-99 D co CCGG 127.060 -999.990 ... R5 2003 11 26 15 25 00 36.6200 -97.4800 374.00 314.00 60.00 116046 SGP 2003 11 20 20 26 00 1590-99 D co CCGG 126.930 -999.990 ... R5 2003 11 26 15 38 00 36.6200 -97.4800 374.00 314.00 60.00 116047 SGP 2003 11 28 20 51 00 75-98 D co CCGG 164.910 -999.990 ... R5 2003 12 18 14 53 00 36.6200 -97.4800 374.00 314.00 60.00 116048 SGP 2003 11 28 20 51 00 76-98 D co CCGG 164.180 -999.990 ... R5 2003 12 18 15 06 00 36.6200 -97.4800 374.00 314.00 60.00 116049 SGP 2003 12 04 21 31 00 4435-91 D co CCGG 181.730 -999.990 ... R5 2003 12 18 13 34 00 36.6200 -97.4800 374.00 314.00 60.00 116050 SGP 2003 12 04 21 31 00 4436-91 D co CCGG 183.000 -999.990 ... R5 2003 12 18 13 47 00 36.6200 -97.4800 374.00 314.00 60.00 116051 SGP 2003 12 11 19 40 00 467-99 D co CCGG 170.240 -999.990 ... R5 2004 01 06 09 24 00 36.6200 -97.4800 374.00 314.00 60.00 116052 SGP 2003 12 11 19 40 00 468-99 D co CCGG 170.720 -999.990 ... R5 2004 01 06 09 37 00 36.6200 -97.4800 374.00 314.00 60.00 116053 SGP 2003 12 18 20 11 00 149-91 D co CCGG 142.300 -999.990 ... R5 2004 01 06 09 50 00 36.6200 -97.4800 374.00 314.00 60.00 116054 SGP 2003 12 18 20 11 00 150-91 D co CCGG 142.890 -999.990 ... R5 2004 01 06 10 03 00 36.6200 -97.4800 374.00 314.00 60.00 116055 SGP 2003 12 23 15 07 00 6527-66 D co CCGG 139.040 -999.990 ... R5 2004 01 12 14 13 00 36.6200 -97.4800 374.00 314.00 60.00 116056 SGP 2003 12 23 15 07 00 6528-66 D co CCGG 139.150 -999.990 ... R5 2004 01 12 14 26 00 36.6200 -97.4800 374.00 314.00 60.00 116057 SGP 2003 12 31 20 33 00 1159-99 D co CCGG 165.380 -999.990 ... R5 2004 01 12 12 54 00 36.6200 -97.4800 374.00 314.00 60.00 116064 SGP 2003 12 31 20 33 00 1160-99 D co CCGG 164.170 -999.990 ... R5 2004 01 12 13 07 00 36.6200 -97.4800 374.00 314.00 60.00 116065 SGP 2004 01 09 20 05 00 1579-99 D co CCGG 230.850 -999.990 .XC R5 2004 01 27 14 31 00 36.6200 -97.4800 374.00 314.00 60.00 116074 SGP 2004 01 09 20 05 00 1580-99 D co CCGG 230.590 -999.990 .XC R5 2004 01 27 14 44 00 36.6200 -97.4800 374.00 314.00 60.00 116075 SGP 2004 01 15 20 00 00 1581-99 D co CCGG 173.650 -999.990 ... R5 2004 01 27 14 58 00 36.6200 -97.4800 374.00 314.00 60.00 116084 SGP 2004 01 15 20 00 00 1582-99 D co CCGG 174.280 -999.990 ... R5 2004 01 27 15 11 00 36.6200 -97.4800 374.00 314.00 60.00 116085 SGP 2004 01 22 20 11 00 1487-99 D co CCGG 146.030 -999.990 ... R5 2004 02 06 09 44 00 36.6200 -97.4800 374.00 314.00 60.00 116092 SGP 2004 01 22 20 11 00 1488-99 D co CCGG 146.430 -999.990 ... R5 2004 02 06 09 57 00 36.6200 -97.4800 374.00 314.00 60.00 116093 SGP 2004 01 29 20 18 00 1489-99 D co CCGG 211.220 -999.990 ... R5 2004 02 06 10 12 00 36.6200 -97.4800 374.00 314.00 60.00 116098 SGP 2004 01 29 20 18 00 1490-99 D co CCGG 210.750 -999.990 ... R5 2004 02 06 10 25 00 36.6200 -97.4800 374.00 314.00 60.00 116099 SGP 2004 02 05 20 44 00 2323-99 D co CCGG 195.970 -999.990 ... R5 2004 02 24 13 58 00 36.6200 -97.4800 374.00 314.00 60.00 116102 SGP 2004 02 05 20 44 00 2324-99 D co CCGG 196.520 -999.990 ... R5 2004 02 24 14 11 00 36.6200 -97.4800 374.00 314.00 60.00 116103 SGP 2004 02 12 20 40 00 603-91 D co CCGG 157.970 -999.990 ... R5 2004 02 24 14 24 00 36.6200 -97.4800 374.00 314.00 60.00 116111 SGP 2004 02 12 20 40 00 604-91 D co CCGG 155.110 -999.990 ... R5 2004 02 24 14 37 00 36.6200 -97.4800 374.00 314.00 60.00 116112 SGP 2004 02 19 20 21 00 6301-66 D co CCGG 181.270 -999.990 ... R5 2004 03 08 16 45 00 36.6200 -97.4800 374.00 314.00 60.00 116119 SGP 2004 02 19 20 21 00 6302-66 D co CCGG 181.240 -999.990 ... R5 2004 03 08 16 58 00 36.6200 -97.4800 374.00 314.00 60.00 116120 SGP 2004 02 26 20 04 00 1805-99 D co CCGG 198.340 -999.990 P.. R5 2004 03 09 11 45 00 36.6200 -97.4800 374.00 314.00 60.00 116127 SGP 2004 02 26 20 04 00 1806-99 D co CCGG 198.380 -999.990 P.. R5 2004 03 09 11 58 00 36.6200 -97.4800 374.00 314.00 60.00 116128 SGP 2004 03 05 20 33 00 1485-99 D co CCGG 193.340 -999.990 P.. R5 2004 03 16 12 37 00 36.6200 -97.4800 374.00 314.00 60.00 116129 SGP 2004 03 05 20 33 00 1486-99 D co CCGG 193.130 -999.990 P.. R5 2004 03 16 12 50 00 36.6200 -97.4800 374.00 314.00 60.00 116130 SGP 2004 03 11 20 00 00 1315-99 D co CCGG 163.650 -999.990 ... R5 2004 03 24 13 54 00 36.6200 -97.4800 374.00 314.00 60.00 116137 SGP 2004 03 11 20 00 00 1316-99 D co CCGG 163.410 -999.990 ... R5 2004 03 24 14 07 00 36.6200 -97.4800 374.00 314.00 60.00 116138 SGP 2004 03 18 20 38 00 1317-99 D co CCGG 168.150 -999.990 ... R5 2004 03 24 14 20 00 36.6200 -97.4800 374.00 314.00 60.00 116141 SGP 2004 03 18 20 38 00 1318-99 D co CCGG 165.320 -999.990 ... R5 2004 03 24 14 33 00 36.6200 -97.4800 374.00 314.00 60.00 116142 SGP 2004 03 25 20 47 00 113-99 D co CCGG 159.430 -999.990 ... R5 2004 04 07 16 38 00 36.6200 -97.4800 374.00 314.00 60.00 116145 SGP 2004 03 25 20 47 00 114-99 D co CCGG 158.860 -999.990 ... R5 2004 04 07 16 51 00 36.6200 -97.4800 374.00 314.00 60.00 116146 SGP 2004 04 01 21 07 00 2263-99 D co CCGG 213.540 -999.990 ... R5 2004 04 07 16 10 00 36.6200 -97.4800 374.00 314.00 60.00 116151 SGP 2004 04 01 21 07 00 2264-99 D co CCGG 212.380 -999.990 ... R5 2004 04 07 16 23 00 36.6200 -97.4800 374.00 314.00 60.00 116152 SGP 2004 04 08 18 45 00 2330-99 D co CCGG 167.050 -999.990 ... R5 2004 04 20 15 42 00 36.6200 -97.4800 374.00 314.00 60.00 116159 SGP 2004 04 08 18 45 00 2331-99 D co CCGG 167.670 -999.990 ... R5 2004 04 20 15 29 00 36.6200 -97.4800 374.00 314.00 60.00 116160 SGP 2004 04 15 20 48 00 2329-99 D co CCGG 162.060 -999.990 ... R5 2004 04 20 15 03 00 36.6200 -97.4800 374.00 314.00 60.00 116163 SGP 2004 04 15 20 48 00 2332-99 D co CCGG 162.480 -999.990 ... R5 2004 04 20 15 16 00 36.6200 -97.4800 374.00 314.00 60.00 116164 SGP 2004 04 22 19 00 00 1765-99 D co CCGG 164.260 -999.990 P.. R5 2004 05 04 12 25 00 36.6200 -97.4800 374.00 314.00 60.00 116167 SGP 2004 04 22 19 00 00 1766-99 D co CCGG 163.970 -999.990 P.. R5 2004 05 04 12 38 00 36.6200 -97.4800 374.00 314.00 60.00 116168 SGP 2004 04 29 19 23 00 1973-99 D co CCGG 172.990 -999.990 P.. R5 2004 05 04 12 51 00 36.6200 -97.4800 374.00 314.00 60.00 116173 SGP 2004 04 29 19 23 00 1974-99 D co CCGG 176.210 -999.990 P.. R5 2004 05 04 13 04 00 36.6200 -97.4800 374.00 314.00 60.00 116174 SGP 2004 05 06 19 00 00 2993-99 D co CCGG 160.730 -999.990 ... R5 2004 05 24 12 49 00 36.6200 -97.4800 374.00 314.00 60.00 116177 SGP 2004 05 06 19 00 00 2994-99 D co CCGG 160.100 -999.990 ... R5 2004 05 24 13 02 00 36.6200 -97.4800 374.00 314.00 60.00 116178 SGP 2004 05 13 20 17 00 2349-99 D co CCGG 151.200 -999.990 ... R5 2004 05 24 12 23 00 36.6200 -97.4800 374.00 314.00 60.00 116185 SGP 2004 05 13 20 17 00 2350-99 D co CCGG 151.010 -999.990 ... R5 2004 05 24 12 36 00 36.6200 -97.4800 374.00 314.00 60.00 116186 SGP 2004 05 20 19 05 00 553-99 D co CCGG 119.690 -999.990 ... R5 2004 06 03 12 42 00 36.6200 -97.4800 374.00 314.00 60.00 116193 SGP 2004 05 20 19 05 00 554-99 D co CCGG 119.950 -999.990 ... R5 2004 06 03 12 55 00 36.6200 -97.4800 374.00 314.00 60.00 116194 SGP 2004 05 27 19 30 00 3535-99 D co CCGG 147.820 -999.990 ... R5 2004 06 03 13 34 00 36.6200 -97.4800 374.00 314.00 60.00 116197 SGP 2004 05 27 19 30 00 3536-99 D co CCGG 148.130 -999.990 ... R5 2004 06 03 13 47 00 36.6200 -97.4800 374.00 314.00 60.00 116198 SGP 2004 06 03 19 42 00 3053-99 D co CCGG 135.820 -999.990 ... R5 2004 06 17 16 26 00 36.6200 -97.4800 374.00 314.00 60.00 116203 SGP 2004 06 03 19 42 00 3054-99 D co CCGG 136.030 -999.990 ... R5 2004 06 17 16 39 00 36.6200 -97.4800 374.00 314.00 60.00 116204 SGP 2004 06 10 19 20 00 3023-99 D co CCGG 117.030 -999.990 ... R5 2004 06 17 16 52 00 36.6200 -97.4800 374.00 314.00 60.00 116205 SGP 2004 06 10 19 20 00 3024-99 D co CCGG 116.800 -999.990 ... R5 2004 06 17 17 05 00 36.6200 -97.4800 374.00 314.00 60.00 116206 SGP 2004 06 17 19 30 00 3573-99 D co CCGG 145.540 -999.990 ... R5 2004 07 09 15 19 00 36.6200 -97.4800 374.00 314.00 60.00 116216 SGP 2004 06 17 19 30 00 3574-99 D co CCGG 145.590 -999.990 ... R5 2004 07 09 15 32 00 36.6200 -97.4800 374.00 314.00 60.00 116217 SGP 2004 06 24 19 10 00 3613-99 D co CCGG 124.660 -999.990 ... R5 2004 07 12 09 17 00 36.6200 -97.4800 374.00 314.00 60.00 116224 SGP 2004 06 24 19 10 00 3614-99 D co CCGG 124.360 -999.990 ... R5 2004 07 12 09 30 00 36.6200 -97.4800 374.00 314.00 60.00 116225 SGP 2004 07 01 18 45 00 2785-99 D co CCGG 108.890 -999.990 ... R5 2004 07 28 15 25 00 36.6200 -97.4800 374.00 314.00 60.00 116228 SGP 2004 07 01 18 45 00 2786-99 D co CCGG 109.540 -999.990 ... R5 2004 07 28 15 38 00 36.6200 -97.4800 374.00 314.00 60.00 116229 SGP 2004 07 08 19 10 00 285-99 D co CCGG 106.260 -999.990 ... R5 2004 07 28 15 53 00 36.6200 -97.4800 374.00 314.00 60.00 116232 SGP 2004 07 08 19 10 00 286-99 D co CCGG 106.070 -999.990 ... R5 2004 07 28 16 06 00 36.6200 -97.4800 374.00 314.00 60.00 116233 SGP 2004 07 15 19 10 00 3323-99 D co CCGG 130.850 -999.990 ... R5 2004 08 03 14 32 00 36.6200 -97.4800 374.00 314.00 60.00 116238 SGP 2004 07 15 19 10 00 3324-99 D co CCGG 131.430 -999.990 ... R5 2004 08 03 14 46 00 36.6200 -97.4800 374.00 314.00 60.00 116239 SGP 2004 07 22 19 00 00 3325-99 D co CCGG 221.290 -999.990 .X. R5 2004 08 03 14 06 00 36.6200 -97.4800 374.00 314.00 60.00 116250 SGP 2004 07 22 19 00 00 3326-99 D co CCGG 219.740 -999.990 .X. R5 2004 08 03 14 19 00 36.6200 -97.4800 374.00 314.00 60.00 116251 SGP 2004 07 29 19 38 00 3375-99 D co CCGG 165.730 -999.990 ... R5 2004 08 20 10 11 00 36.6200 -97.4800 374.00 314.00 60.00 116254 SGP 2004 07 29 19 38 00 3376-99 D co CCGG 165.700 -999.990 ... R5 2004 08 20 10 24 00 36.6200 -97.4800 374.00 314.00 60.00 116255 SGP 2004 08 05 19 00 00 219-99 D co CCGG 130.210 -999.990 ... R5 2004 08 20 09 17 00 36.6200 -97.4800 374.00 314.00 60.00 116260 SGP 2004 08 05 19 00 00 220-99 D co CCGG 128.510 -999.990 ... R5 2004 08 20 09 30 00 36.6200 -97.4800 374.00 314.00 60.00 116261 SGP 2004 08 12 19 15 00 6529-66 D co CCGG 114.270 -999.990 ... R5 2004 08 26 15 52 00 36.6200 -97.4800 374.00 314.00 60.00 116274 SGP 2004 08 12 19 15 00 6530-66 D co CCGG 113.800 -999.990 ... R5 2004 08 26 16 05 00 36.6200 -97.4800 374.00 314.00 60.00 116275 SGP 2004 08 19 18 43 00 6545-66 D co CCGG 147.370 -999.990 ... R5 2004 08 26 15 26 00 36.6200 -97.4800 374.00 314.00 60.00 116276 SGP 2004 08 19 18 43 00 6546-66 D co CCGG 150.050 -999.990 ... R5 2004 08 26 15 39 00 36.6200 -97.4800 374.00 314.00 60.00 116277 SGP 2004 08 26 19 00 00 4003-99 D co CCGG 104.290 -999.990 ... R5 2004 09 28 19 20 00 36.7800 -97.5000 374.00 314.00 60.00 188509 SGP 2004 08 26 19 00 00 4004-99 D co CCGG 104.320 -999.990 ... R5 2004 09 28 19 34 00 36.7800 -97.5000 374.00 314.00 60.00 188510 SGP 2004 09 02 19 15 00 2365-99 D co CCGG 138.110 -999.990 ... R5 2004 09 27 09 11 00 36.7800 -97.5000 374.00 314.00 60.00 188985 SGP 2004 09 02 19 15 00 2366-99 D co CCGG 137.670 -999.990 ... R5 2004 09 27 09 25 00 36.7800 -97.5000 374.00 314.00 60.00 188986 SGP 2004 09 09 19 00 00 3721-99 D co CCGG 147.590 -999.990 ... R5 2004 09 24 16 40 00 36.7800 -97.5000 374.00 314.00 60.00 188987 SGP 2004 09 09 19 00 00 3722-99 D co CCGG 146.620 -999.990 ... R5 2004 09 24 16 54 00 36.7800 -97.5000 374.00 314.00 60.00 188988 SGP 2004 09 16 19 00 00 6139-66 D co CCGG 122.910 -999.990 ... R5 2004 10 12 12 08 00 36.7800 -97.5000 374.00 314.00 60.00 189655 SGP 2004 09 16 19 00 00 6140-66 D co CCGG 124.050 -999.990 ... R5 2004 10 12 12 22 00 36.7800 -97.5000 374.00 314.00 60.00 189656 SGP 2004 09 23 19 00 00 331-99 D co CCGG 110.870 -999.990 ... R5 2004 10 12 12 36 00 36.7800 -97.5000 374.00 314.00 60.00 189653 SGP 2004 09 23 19 00 00 332-99 D co CCGG 109.980 -999.990 ... R5 2004 10 12 12 50 00 36.7800 -97.5000 374.00 314.00 60.00 189654 SGP 2004 09 30 19 31 00 10-99 D co CCGG 178.760 -999.990 .X. R5 2004 10 25 16 41 00 36.7800 -97.5000 374.00 314.00 60.00 190478 SGP 2004 09 30 19 31 00 9-99 D co CCGG 179.250 -999.990 .X. R5 2004 10 25 16 27 00 36.7800 -97.5000 374.00 314.00 60.00 190479 SGP 2004 10 07 19 00 00 171-99 D co CCGG 102.860 -999.990 ... R5 2004 10 26 11 20 00 36.7800 -97.5000 374.00 314.00 60.00 190476 SGP 2004 10 07 19 00 00 172-99 D co CCGG 103.160 -999.990 ... R5 2004 10 26 11 34 00 36.7800 -97.5000 374.00 314.00 60.00 190477 SGP 2004 10 15 19 20 00 2489-99 D co CCGG 104.800 -999.990 ... R5 2004 11 05 12 03 00 36.7800 -97.5000 374.00 314.00 60.00 191230 SGP 2004 10 15 19 20 00 2490-99 D co CCGG 105.090 -999.990 ... R5 2004 11 05 12 17 00 36.7800 -97.5000 374.00 314.00 60.00 191231 SGP 2004 10 21 19 07 00 6717-66 D co CCGG 172.300 -999.990 P.. R5 2004 11 05 12 31 00 36.7800 -97.5000 374.00 314.00 60.00 191232 SGP 2004 10 21 19 07 00 6718-66 D co CCGG 176.170 -999.990 P.. R5 2004 11 05 12 45 00 36.7800 -97.5000 374.00 314.00 60.00 191233 SGP 2004 10 28 21 00 00 1449-99 D co CCGG 106.440 -999.990 ... R5 2004 11 10 20 32 00 36.7800 -97.5000 374.00 314.00 60.00 191604 SGP 2004 10 28 21 00 00 1450-99 D co CCGG 107.870 -999.990 ... R5 2004 11 10 20 46 00 36.7800 -97.5000 374.00 314.00 60.00 191605 SGP 2004 11 04 19 55 00 6094-66 D co CCGG 120.230 -999.990 ... R5 2004 11 10 21 00 00 36.7800 -97.5000 374.00 314.00 60.00 191595 SGP 2004 11 12 20 47 00 2143-99 D co CCGG 146.370 -999.990 ... R5 2004 11 30 15 47 00 36.7800 -97.5000 374.00 314.00 60.00 192173 SGP 2004 11 12 20 47 00 2144-99 D co CCGG 147.260 -999.990 ... R5 2004 11 30 16 01 00 36.7800 -97.5000 374.00 314.00 60.00 192174 SGP 2004 11 18 20 18 00 1281-99 D co CCGG 125.660 -999.990 ... R5 2004 11 30 14 47 00 36.7800 -97.5000 374.00 314.00 60.00 192171 SGP 2004 11 18 20 18 00 1282-99 D co CCGG 125.910 -999.990 ... R5 2004 11 30 15 02 00 36.7800 -97.5000 374.00 314.00 60.00 192172 SGP 2004 11 24 19 04 00 2267-99 D co CCGG 135.080 -999.990 ... R5 2004 12 09 10 11 00 36.7800 -97.5000 374.00 314.00 60.00 192732 SGP 2004 11 24 19 04 00 2268-99 D co CCGG 135.080 -999.990 ... R5 2004 12 09 10 25 00 36.7800 -97.5000 374.00 314.00 60.00 192733 SGP 2004 12 02 20 40 00 3325-99 D co CCGG 125.560 -999.990 ... R5 2004 12 09 09 43 00 36.7800 -97.5000 374.00 314.00 60.00 192731 SGP 2004 12 02 20 40 00 3326-99 D co CCGG 125.510 -999.990 ... R5 2004 12 09 09 57 00 36.7800 -97.5000 374.00 314.00 60.00 192730 SGP 2004 12 09 20 00 00 3489-99 D co CCGG 147.340 -999.990 ... R5 2005 01 03 11 38 00 36.7800 -97.5000 374.00 314.00 60.00 193371 SGP 2004 12 09 20 00 00 3490-99 D co CCGG 147.030 -999.990 ... R5 2005 01 03 11 52 00 36.7800 -97.5000 374.00 314.00 60.00 193372 SGP 2004 12 16 20 31 00 1269-99 D co CCGG 126.710 -999.990 ... R5 2005 01 03 11 10 00 36.7800 -97.5000 374.00 314.00 60.00 193369 SGP 2004 12 16 20 31 00 1270-99 D co CCGG 125.750 -999.990 ... R5 2005 01 03 11 24 00 36.7800 -97.5000 374.00 314.00 60.00 193370 SGP 2004 12 23 20 21 00 861-99 D co CCGG 141.960 -999.990 ... R5 2005 01 11 11 28 00 36.7800 -97.5000 374.00 314.00 60.00 193733 SGP 2004 12 23 20 21 00 862-99 D co CCGG 143.400 -999.990 ... R5 2005 01 11 11 42 00 36.7800 -97.5000 374.00 314.00 60.00 193734 SGP 2004 12 30 20 27 00 1355-99 D co CCGG 131.670 -999.990 ... R5 2005 01 11 11 56 00 36.7800 -97.5000 374.00 314.00 60.00 193731 SGP 2004 12 30 20 27 00 1356-99 D co CCGG 129.400 -999.990 ... R5 2005 01 11 12 10 00 36.7800 -97.5000 374.00 314.00 60.00 193732 SGP 2005 01 07 20 30 00 3033-99 D co CCGG 203.730 -999.990 .X. R5 2005 01 27 10 12 00 36.7800 -97.5000 374.00 314.00 60.00 194243 SGP 2005 01 07 20 30 00 3034-99 D co CCGG 204.110 -999.990 .X. R5 2005 01 27 10 26 00 36.7800 -97.5000 374.00 314.00 60.00 194244 SGP 2005 01 13 20 00 00 2281-99 D co CCGG 152.400 -999.990 ... R5 2005 01 27 11 39 00 36.7800 -97.5000 374.00 314.00 60.00 194241 SGP 2005 01 13 20 00 00 2282-99 D co CCGG 152.530 -999.990 ... R5 2005 01 27 11 53 00 36.7800 -97.5000 374.00 314.00 60.00 194242 SGP 2005 01 20 20 00 00 2585-99 D co CCGG 137.710 -999.990 ... R5 2005 02 09 15 28 00 36.7800 -97.5000 374.00 314.00 60.00 194895 SGP 2005 01 20 20 00 00 2586-99 D co CCGG 137.910 -999.990 ... R5 2005 02 09 15 42 00 36.7800 -97.5000 374.00 314.00 60.00 194896 SGP 2005 01 27 20 26 00 533-99 D co CCGG 163.770 -999.990 ... R5 2005 02 09 15 56 00 36.7800 -97.5000 374.00 314.00 60.00 194893 SGP 2005 01 27 20 26 00 534-99 D co CCGG 164.170 -999.990 ... R5 2005 02 09 16 10 00 36.7800 -97.5000 374.00 314.00 60.00 194894 SGP 2005 02 03 20 00 00 4009-99 D co CCGG 160.240 -999.990 ... R5 2005 02 15 16 12 00 36.7800 -97.5000 374.00 314.00 60.00 195115 SGP 2005 02 03 20 00 00 4010-99 D co CCGG 158.810 -999.990 ... R5 2005 02 15 16 26 00 36.7800 -97.5000 374.00 314.00 60.00 195116 SGP 2005 02 10 20 00 00 6158-66 D co CCGG 177.780 -999.990 ... R5 2005 02 15 15 58 00 36.7800 -97.5000 374.00 314.00 60.00 195114 SGP 2005 02 17 19 30 00 3561-99 D co CCGG 150.270 -999.990 ... R5 2005 03 02 14 19 00 36.7800 -97.5000 374.00 314.00 60.00 195967 SGP 2005 02 17 19 30 00 3562-99 D co CCGG 150.800 -999.990 ... R5 2005 03 02 14 33 00 36.7800 -97.5000 374.00 314.00 60.00 195968 SGP 2005 02 24 20 13 00 6761-66 D co CCGG 157.230 -999.990 ... R5 2005 03 02 13 51 00 36.7800 -97.5000 374.00 314.00 60.00 195965 SGP 2005 02 24 20 13 00 6762-66 D co CCGG 158.480 -999.990 ... R5 2005 03 02 14 05 00 36.7800 -97.5000 374.00 314.00 60.00 195966 SGP 2005 03 03 20 01 00 2835-99 D co CCGG 166.530 -999.990 ... R5 2005 03 16 11 44 00 36.7800 -97.5000 374.00 314.00 60.00 196627 SGP 2005 03 03 20 01 00 2836-99 D co CCGG 166.170 -999.990 ... R5 2005 03 16 11 59 00 36.7800 -97.5000 374.00 314.00 60.00 196628 SGP 2005 03 10 21 10 00 1801-99 D co CCGG 154.990 -999.990 ... R5 2005 03 16 12 13 00 36.7800 -97.5000 374.00 314.00 60.00 196625 SGP 2005 03 10 21 10 00 1802-99 D co CCGG 155.280 -999.990 ... R5 2005 03 16 12 27 00 36.7800 -97.5000 374.00 314.00 60.00 196626 SGP 2005 03 17 21 22 00 1313-99 D co CCGG 167.660 -999.990 ... R5 2005 03 29 15 20 00 36.7800 -97.5000 374.00 314.00 60.00 197137 SGP 2005 03 17 21 22 00 1314-99 D co CCGG 169.850 -999.990 ... R5 2005 03 29 15 34 00 36.7800 -97.5000 374.00 314.00 60.00 197136 SGP 2005 03 24 20 01 00 1915-99 D co CCGG 196.980 -999.990 ... R5 2005 03 29 15 48 00 36.7800 -97.5000 374.00 314.00 60.00 197134 SGP 2005 03 24 20 01 00 1916-99 D co CCGG 197.110 -999.990 ... R5 2005 03 29 16 02 00 36.7800 -97.5000 374.00 314.00 60.00 197135 SGP 2005 03 31 20 03 00 1-99 D co CCGG 171.730 -999.990 ... R5 2005 04 14 12 09 00 36.7800 -97.5000 374.00 314.00 60.00 197678 SGP 2005 03 31 20 03 00 2-99 D co CCGG 172.890 -999.990 ... R5 2005 04 14 12 23 00 36.7800 -97.5000 374.00 314.00 60.00 197679 SGP 2005 04 07 20 31 00 2739-99 D co CCGG 175.680 -999.990 ... R5 2005 04 14 12 37 00 36.7800 -97.5000 374.00 314.00 60.00 197680 SGP 2005 04 07 20 31 00 2740-99 D co CCGG 177.330 -999.990 ... R5 2005 04 14 12 51 00 36.7800 -97.5000 374.00 314.00 60.00 197681 SGP 2005 04 14 19 01 00 2609-99 D co CCGG 208.750 -999.990 ... R5 2005 04 29 12 51 00 36.7800 -97.5000 374.00 314.00 60.00 198061 SGP 2005 04 14 19 01 00 2610-99 D co CCGG 208.790 -999.990 ... R5 2005 04 29 13 05 00 36.7800 -97.5000 374.00 314.00 60.00 198062 SGP 2005 04 21 18 50 00 2955-99 D co CCGG 155.520 -999.990 ... R5 2005 04 29 12 23 00 36.7800 -97.5000 374.00 314.00 60.00 198063 SGP 2005 04 21 18 50 00 2956-99 D co CCGG 155.610 -999.990 ... R5 2005 04 29 12 37 00 36.7800 -97.5000 374.00 314.00 60.00 198064 SGP 2005 04 28 19 54 00 4179-99 D co CCGG 173.630 -999.990 ... R5 2005 05 26 13 56 00 36.7800 -97.5000 374.00 314.00 60.00 199261 SGP 2005 04 28 19 54 00 4180-99 D co CCGG 173.010 -999.990 ... R5 2005 05 26 14 10 00 36.7800 -97.5000 374.00 314.00 60.00 199262 SGP 2005 05 05 19 00 00 6185-66 D co CCGG 204.470 -999.990 ... R5 2005 05 26 14 24 00 36.7800 -97.5000 374.00 314.00 60.00 199263 SGP 2005 05 05 19 00 00 6186-66 D co CCGG 204.170 -999.990 ... R5 2005 05 26 14 38 00 36.7800 -97.5000 374.00 314.00 60.00 199264 SGP 2005 05 12 19 00 00 2205-99 D co CCGG 163.270 -999.990 ... R5 2005 06 07 12 14 00 36.7800 -97.5000 374.00 314.00 60.00 199620 SGP 2005 05 12 19 00 00 2206-99 D co CCGG 164.160 -999.990 ... R5 2005 06 07 12 28 00 36.7800 -97.5000 374.00 314.00 60.00 199621 SGP 2005 05 19 19 00 00 3325-99 D co CCGG 164.330 -999.990 ... R5 2005 06 07 11 46 00 36.7800 -97.5000 374.00 314.00 60.00 199618 SGP 2005 05 19 19 00 00 3326-99 D co CCGG 165.020 -999.990 ... R5 2005 06 07 12 00 00 36.7800 -97.5000 374.00 314.00 60.00 199619 SGP 2005 05 26 19 00 00 2827-99 D co CCGG 134.320 -999.990 ... R5 2005 06 21 13 52 00 36.7800 -97.5000 374.00 314.00 60.00 200421 SGP 2005 05 26 19 00 00 2828-99 D co CCGG 133.940 -999.990 ... R5 2005 06 21 14 07 00 36.7800 -97.5000 374.00 314.00 60.00 200422 SGP 2005 06 02 19 08 00 3081-99 D co CCGG 159.990 -999.990 ... R5 2005 06 21 14 21 00 36.7800 -97.5000 374.00 314.00 60.00 200419 SGP 2005 06 02 19 08 00 3082-99 D co CCGG 160.070 -999.990 ... R5 2005 06 21 14 35 00 36.7800 -97.5000 374.00 314.00 60.00 200420 SGP 2005 06 09 19 10 00 1347-99 D co CCGG 115.820 -999.990 ... R5 2005 07 13 12 41 00 36.7800 -97.5000 374.00 314.00 60.00 201297 SGP 2005 06 09 19 10 00 1348-99 D co CCGG 116.440 -999.990 ... R5 2005 07 13 12 55 00 36.7800 -97.5000 374.00 314.00 60.00 201298 SGP 2005 06 16 19 00 00 3473-99 D co CCGG 145.640 -999.990 ... R5 2005 07 13 13 09 00 36.7800 -97.5000 374.00 314.00 60.00 201295 SGP 2005 06 16 19 00 00 3474-99 D co CCGG 145.100 -999.990 ... R5 2005 07 13 13 24 00 36.7800 -97.5000 374.00 314.00 60.00 201296 SGP 2005 06 23 19 00 00 89-99 D co CCGG 180.750 -999.990 P.. R5 2005 07 25 12 12 00 36.7800 -97.5000 374.00 314.00 60.00 202120 SGP 2005 06 23 19 00 00 90-99 D co CCGG 176.790 -999.990 P.. R5 2005 07 25 12 26 00 36.7800 -97.5000 374.00 314.00 60.00 202121 SGP 2005 06 30 19 54 00 1401-99 D co CCGG 135.000 -999.990 ... R5 2005 07 25 12 40 00 36.7800 -97.5000 374.00 314.00 60.00 202118 SGP 2005 06 30 19 54 00 1402-99 D co CCGG 134.080 -999.990 ... R5 2005 07 25 12 55 00 36.7800 -97.5000 374.00 314.00 60.00 202119 SGP 2005 07 07 19 55 00 1149-99 D co CCGG 152.500 -999.990 ... R5 2005 08 08 10 04 00 36.7800 -97.5000 374.00 314.00 60.00 202667 SGP 2005 07 07 19 55 00 1150-99 D co CCGG 153.080 -999.990 ... R5 2005 08 08 10 18 00 36.7800 -97.5000 374.00 314.00 60.00 202668 SGP 2005 07 14 19 30 00 1379-99 D co CCGG 202.190 -999.990 P.. R5 2005 08 08 09 36 00 36.7800 -97.5000 374.00 314.00 60.00 202669 SGP 2005 07 14 19 30 00 1380-99 D co CCGG 221.000 -999.990 P.. R5 2005 08 08 09 50 00 36.7800 -97.5000 374.00 314.00 60.00 202670 SGP 2005 07 21 19 32 00 799-99 D co CCGG 92.630 -999.990 P.. R5 2005 08 17 12 20 00 36.7800 -97.5000 374.00 314.00 60.00 203413 SGP 2005 07 21 19 32 00 800-99 D co CCGG 95.840 -999.990 P.. R5 2005 08 17 12 34 00 36.7800 -97.5000 374.00 314.00 60.00 203414 SGP 2005 07 28 19 32 00 713-99 D co CCGG 119.470 -999.990 ... R5 2005 08 17 11 51 00 36.7800 -97.5000 374.00 314.00 60.00 203415 SGP 2005 07 28 19 32 00 714-99 D co CCGG 119.530 -999.990 ... R5 2005 08 17 12 06 00 36.7800 -97.5000 374.00 314.00 60.00 203416 SGP 2005 08 11 19 53 00 3281-99 D co CCGG 110.090 -999.990 ... R5 2005 09 15 11 19 00 36.7800 -97.5000 374.00 314.00 60.00 204916 SGP 2005 08 11 19 53 00 3282-99 D co CCGG 109.860 -999.990 ... R5 2005 09 15 11 33 00 36.7800 -97.5000 374.00 314.00 60.00 204917 SGP 2005 08 19 18 56 00 4083-99 D co CCGG 95.040 -999.990 ... R5 2005 09 15 11 48 00 36.7800 -97.5000 374.00 314.00 60.00 204918 SGP 2005 08 19 18 56 00 4084-99 D co CCGG 95.610 -999.990 ... R5 2005 09 15 12 02 00 36.7800 -97.5000 374.00 314.00 60.00 204919 SGP 2005 08 25 18 57 00 4049-99 D co CCGG 120.500 -999.990 ... R5 2005 09 22 12 20 00 36.7800 -97.5000 374.00 314.00 60.00 205648 SGP 2005 08 25 18 57 00 4050-99 D co CCGG 120.440 -999.990 ... R5 2005 09 22 12 35 00 36.7800 -97.5000 374.00 314.00 60.00 205649 SGP 2005 09 01 19 12 00 2945-99 D co CCGG 172.830 -999.990 P.. R5 2005 09 22 12 49 00 36.7800 -97.5000 374.00 314.00 60.00 205650 SGP 2005 09 01 19 12 00 2946-99 D co CCGG 156.690 -999.990 P.. R5 2005 09 22 13 03 00 36.7800 -97.5000 374.00 314.00 60.00 205651 SGP 2005 09 08 19 23 00 6577-66 D co CCGG 176.700 -999.990 ... R5 2005 09 21 14 45 00 36.7800 -97.5000 374.00 314.00 60.00 206169 SGP 2005 09 08 19 23 00 6578-66 D co CCGG 176.900 -999.990 ... R5 2005 09 21 14 59 00 36.7800 -97.5000 374.00 314.00 60.00 206170 SGP 2005 09 15 19 17 00 1745-99 D co CCGG 115.460 -999.990 ... R5 2005 09 21 14 17 00 36.7800 -97.5000 374.00 314.00 60.00 206171 SGP 2005 09 15 19 17 00 1746-99 D co CCGG 115.110 -999.990 ... R5 2005 09 21 14 31 00 36.7800 -97.5000 374.00 314.00 60.00 206172 SGP 2005 09 22 19 38 00 3403-99 D co CCGG 107.290 -999.990 ... R5 2005 10 19 16 54 00 36.7800 -97.5000 374.00 314.00 60.00 207051 SGP 2005 09 22 19 38 00 3404-99 D co CCGG 106.120 -999.990 ... R5 2005 10 19 17 08 00 36.7800 -97.5000 374.00 314.00 60.00 207052 SGP 2005 09 29 15 15 00 3529-99 D co CCGG 113.150 -999.990 ... R5 2005 10 19 16 25 00 36.7800 -97.5000 374.00 314.00 60.00 207053 SGP 2005 09 29 15 15 00 3530-99 D co CCGG 113.330 -999.990 ... R5 2005 10 19 16 39 00 36.7800 -97.5000 374.00 314.00 60.00 207054 SGP 2005 10 06 19 00 00 4109-99 D co CCGG 111.650 -999.990 ... R5 2005 10 31 11 01 00 36.7800 -97.5000 374.00 314.00 60.00 207434 SGP 2005 10 06 19 00 00 4110-99 D co CCGG 112.010 -999.990 ... R5 2005 10 31 11 15 00 36.7800 -97.5000 374.00 314.00 60.00 207435 SGP 2005 10 13 19 00 00 2883-99 D co CCGG 156.760 -999.990 ... R5 2005 10 31 10 32 00 36.7800 -97.5000 374.00 314.00 60.00 207793 SGP 2005 10 13 19 00 00 2884-99 D co CCGG 157.130 -999.990 ... R5 2005 10 31 10 46 00 36.7800 -97.5000 374.00 314.00 60.00 207794 SGP 2005 10 20 19 00 00 1568-99 D co CCGG 125.970 -999.990 ... R5 2005 11 15 09 35 00 36.7800 -97.5000 374.00 314.00 60.00 208321 SGP 2005 10 20 19 00 00 776-99 D co CCGG 126.570 -999.990 ... R5 2005 11 15 09 21 00 36.7800 -97.5000 374.00 314.00 60.00 208320 SGP 2005 10 27 18 50 00 2526-99 D co CCGG 162.660 -999.990 ... R5 2005 11 15 10 04 00 36.7800 -97.5000 374.00 314.00 60.00 208319 SGP 2005 10 27 18 50 00 4007-99 D co CCGG 162.920 -999.990 ... R5 2005 11 15 09 50 00 36.7800 -97.5000 374.00 314.00 60.00 208318 SGP 2005 11 03 19 45 00 2409-99 D co CCGG 136.540 -999.990 ... R5 2005 11 23 11 54 00 36.7800 -97.5000 374.00 314.00 60.00 209209 SGP 2005 11 03 19 45 00 2410-99 D co CCGG 136.290 -999.990 ... R5 2005 11 23 12 09 00 36.7800 -97.5000 374.00 314.00 60.00 209210 SGP 2005 11 10 17 45 00 3909-99 D co CCGG 134.340 -999.990 ... R5 2005 11 23 12 23 00 36.7800 -97.5000 374.00 314.00 60.00 209207 SGP 2005 11 10 17 45 00 3910-99 D co CCGG 133.810 -999.990 ... R5 2005 11 23 12 37 00 36.7800 -97.5000 374.00 314.00 60.00 209208 SGP 2005 11 17 21 16 00 2507-99 D co CCGG 145.590 -999.990 ... R5 2005 12 05 16 54 00 36.7800 -97.5000 374.00 314.00 60.00 209676 SGP 2005 11 17 21 16 00 2508-99 D co CCGG 145.950 -999.990 ... R5 2005 12 05 17 09 00 36.7800 -97.5000 374.00 314.00 60.00 209677 SGP 2005 11 23 17 25 00 53-99 D co CCGG 124.930 -999.990 ... R5 2005 12 05 17 23 00 36.7800 -97.5000 374.00 314.00 60.00 209674 SGP 2005 11 23 17 25 00 54-99 D co CCGG 124.120 -999.990 ... R5 2005 12 05 17 37 00 36.7800 -97.5000 374.00 314.00 60.00 209675 SGP 2005 12 01 19 25 00 1997-99 D co CCGG 130.820 -999.990 ... R5 2006 01 20 09 53 00 36.7800 -97.5000 374.00 314.00 60.00 211482 SGP 2005 12 01 19 25 00 1998-99 D co CCGG 131.750 -999.990 ... R5 2006 01 20 10 07 00 36.7800 -97.5000 374.00 314.00 60.00 211483 SGP 2006 01 05 21 07 00 277-99 G co CCGG 139.010 -999.990 ... R5 2006 01 20 10 22 00 36.7800 -97.5000 374.00 314.00 60.00 211480 SGP 2006 01 05 21 07 00 278-99 G co CCGG 138.880 -999.990 ... R5 2006 01 20 10 36 00 36.7800 -97.5000 374.00 314.00 60.00 211481 SGP 2006 01 12 19 07 00 2339-99 G co CCGG 148.780 -999.990 ... R5 2006 02 03 09 58 00 36.7800 -97.5000 374.00 314.00 60.00 211924 SGP 2006 01 12 19 07 00 2340-99 G co CCGG 147.890 -999.990 ... R5 2006 02 03 10 12 00 36.7800 -97.5000 374.00 314.00 60.00 211925 SGP 2006 01 19 20 04 00 2075-99 G co CCGG 146.940 -999.990 ... R5 2006 02 03 10 26 00 36.7800 -97.5000 374.00 314.00 60.00 211922 SGP 2006 01 19 20 04 00 2076-99 G co CCGG 146.610 -999.990 ... R5 2006 02 03 10 40 00 36.7800 -97.5000 374.00 314.00 60.00 211923 SGP 2006 01 26 19 22 00 1337-99 G co CCGG 147.560 -999.990 ... R5 2006 02 14 09 57 00 36.7800 -97.5000 374.00 314.00 60.00 212499 SGP 2006 01 26 19 22 00 1338-99 G co CCGG 146.700 -999.990 ... R5 2006 02 14 10 11 00 36.7800 -97.5000 374.00 314.00 60.00 212500 SGP 2006 02 02 20 35 00 3183-99 G co CCGG 138.290 -999.990 ... R5 2006 02 14 09 00 00 36.7800 -97.5000 374.00 314.00 60.00 212497 SGP 2006 02 02 20 35 00 3184-99 G co CCGG 138.350 -999.990 ... R5 2006 02 14 09 14 00 36.7800 -97.5000 374.00 314.00 60.00 212498 SGP 2006 02 09 19 58 00 4189-99 G co CCGG 171.520 -999.990 ... R5 2006 03 01 14 35 00 36.7800 -97.5000 374.00 314.00 60.00 213209 SGP 2006 02 09 19 58 00 4190-99 G co CCGG 171.580 -999.990 ... R5 2006 03 01 14 49 00 36.7800 -97.5000 374.00 314.00 60.00 213210 SGP 2006 02 16 20 21 00 2911-99 G co CCGG 166.840 -999.990 ... R5 2006 03 01 15 03 00 36.7800 -97.5000 374.00 314.00 60.00 213207 SGP 2006 02 16 20 21 00 2912-99 G co CCGG 167.130 -999.990 ... R5 2006 03 01 15 17 00 36.7800 -97.5000 374.00 314.00 60.00 213208 SGP 2006 02 23 20 14 00 3145-99 G co CCGG 167.810 -999.990 ... R5 2006 03 09 10 02 00 36.7800 -97.5000 374.00 314.00 60.00 213707 SGP 2006 02 23 20 14 00 3146-99 G co CCGG 168.100 -999.990 ... R5 2006 03 09 10 16 00 36.7800 -97.5000 374.00 314.00 60.00 213708 SGP 2006 03 02 20 43 00 2179-99 G co CCGG 163.120 -999.990 ... R5 2006 03 09 09 34 00 36.7800 -97.5000 374.00 314.00 60.00 213705 SGP 2006 03 02 20 43 00 2180-99 G co CCGG 163.510 -999.990 ... R5 2006 03 09 09 48 00 36.7800 -97.5000 374.00 314.00 60.00 213706 SGP 2006 03 09 20 02 00 689-99 G co CCGG 154.140 -999.990 ... R5 2006 03 23 11 25 00 36.7800 -97.5000 374.00 314.00 60.00 214190 SGP 2006 03 09 20 02 00 690-99 G co CCGG 154.550 -999.990 ... R5 2006 03 23 11 39 00 36.7800 -97.5000 374.00 314.00 60.00 214191 SGP 2006 03 16 20 00 00 3665-99 G co CCGG 160.000 -999.990 ... R5 2006 03 23 10 57 00 36.7800 -97.5000 374.00 314.00 60.00 214188 SGP 2006 03 16 20 00 00 3666-99 G co CCGG 159.590 -999.990 ... R5 2006 03 23 11 11 00 36.7800 -97.5000 374.00 314.00 60.00 214189 SGP 2006 03 23 20 00 00 267-99 G co CCGG 158.930 -999.990 ... R5 2006 04 06 11 58 00 36.7800 -97.5000 374.00 314.00 60.00 214821 SGP 2006 03 23 20 00 00 268-99 G co CCGG 159.870 -999.990 ... R5 2006 04 06 12 12 00 36.7800 -97.5000 374.00 314.00 60.00 214822 SGP 2006 03 30 20 10 00 3459-99 G co CCGG 143.840 -999.990 ... R5 2006 04 06 11 29 00 36.7800 -97.5000 374.00 314.00 60.00 214823 SGP 2006 03 30 20 10 00 3460-99 G co CCGG 143.440 -999.990 ... R5 2006 04 06 11 44 00 36.7800 -97.5000 374.00 314.00 60.00 214824 SGP 2006 04 06 19 23 00 3947-99 G co CCGG 133.130 -999.990 ... R5 2006 04 19 09 18 00 36.7800 -97.5000 374.00 314.00 60.00 215485 SGP 2006 04 06 19 23 00 3948-99 G co CCGG 132.470 -999.990 ... R5 2006 04 19 09 33 00 36.7800 -97.5000 374.00 314.00 60.00 215486 SGP 2006 04 13 19 52 00 2745-99 G co CCGG 142.400 -999.990 ... R5 2006 04 19 08 50 00 36.7800 -97.5000 374.00 314.00 60.00 215483 SGP 2006 04 13 19 52 00 2746-99 G co CCGG 143.270 -999.990 ... R5 2006 04 19 09 04 00 36.7800 -97.5000 374.00 314.00 60.00 215484 SGP 2006 04 20 19 00 00 3295-99 G co CCGG 176.750 -999.990 ... R5 2006 05 15 10 07 00 36.7800 -97.5000 374.00 314.00 60.00 216455 SGP 2006 04 20 19 00 00 3296-99 G co CCGG 176.020 -999.990 ... R5 2006 05 15 10 22 00 36.7800 -97.5000 374.00 314.00 60.00 216456 SGP 2006 04 27 19 01 00 1071-99 G co CCGG 161.100 -999.990 ... R5 2006 05 15 09 10 00 36.7800 -97.5000 374.00 314.00 60.00 216453 SGP 2006 04 27 19 01 00 1072-99 G co CCGG 160.780 -999.990 ... R5 2006 05 15 09 25 00 36.7800 -97.5000 374.00 314.00 60.00 216454 SGP 2006 05 04 19 22 00 1569-99 G co CCGG 153.360 -999.990 ... R5 2006 05 26 09 01 00 36.7800 -97.5000 374.00 314.00 60.00 216932 SGP 2006 05 04 19 22 00 1570-99 G co CCGG 153.400 -999.990 ... R5 2006 05 26 09 15 00 36.7800 -97.5000 374.00 314.00 60.00 216933 SGP 2006 05 11 19 24 00 247-99 G co CCGG 141.600 -999.990 ... R5 2006 05 25 15 18 00 36.7800 -97.5000 374.00 314.00 60.00 216930 SGP 2006 05 11 19 24 00 248-99 G co CCGG 141.410 -999.990 ... R5 2006 05 25 15 33 00 36.7800 -97.5000 374.00 314.00 60.00 216931 SGP 2006 05 18 21 04 00 1345-99 G co CCGG 145.860 -999.990 ... R5 2006 06 13 09 14 00 36.7800 -97.5000 374.00 314.00 60.00 217638 SGP 2006 05 18 21 04 00 1346-99 G co CCGG 145.000 -999.990 ... R5 2006 06 13 09 29 00 36.7800 -97.5000 374.00 314.00 60.00 217639 SGP 2006 05 25 19 40 00 1445-99 G co CCGG 145.580 -999.990 ... R5 2006 06 13 08 46 00 36.7800 -97.5000 374.00 314.00 60.00 217636 SGP 2006 05 25 19 40 00 1446-99 G co CCGG 144.920 -999.990 ... R5 2006 06 13 09 00 00 36.7800 -97.5000 374.00 314.00 60.00 217637 SGP 2006 06 01 19 30 00 2781-99 G co CCGG 124.200 -999.990 ... R5 2006 06 29 14 08 00 36.7800 -97.5000 374.00 314.00 60.00 218396 SGP 2006 06 01 19 30 00 2782-99 G co CCGG 123.490 -999.990 ... R5 2006 06 29 14 22 00 36.7800 -97.5000 374.00 314.00 60.00 218397 SGP 2006 06 08 18 45 00 3397-99 G co CCGG 129.640 -999.990 ... R5 2006 06 30 09 22 00 36.7800 -97.5000 374.00 314.00 60.00 218394 SGP 2006 06 08 18 45 00 3398-99 G co CCGG 130.110 -999.990 ... R5 2006 06 30 09 36 00 36.7800 -97.5000 374.00 314.00 60.00 218395 SGP 2006 06 15 18 00 00 695-99 G co CCGG 188.850 -999.990 .X. R5 2006 07 14 08 55 00 36.7800 -97.5000 374.00 314.00 60.00 218827 SGP 2006 06 15 18 00 00 696-99 G co CCGG 188.780 -999.990 .X. R5 2006 07 14 09 10 00 36.7800 -97.5000 374.00 314.00 60.00 218828 SGP 2006 06 22 18 55 00 3923-99 G co CCGG 120.340 -999.990 ... R5 2006 07 14 09 24 00 36.7800 -97.5000 374.00 314.00 60.00 218829 SGP 2006 06 22 18 55 00 3924-99 G co CCGG 120.760 -999.990 ... R5 2006 07 14 09 38 00 36.7800 -97.5000 374.00 314.00 60.00 218830 SGP 2006 06 29 18 51 00 3743-99 G co CCGG 149.210 -999.990 ... R5 2006 07 24 10 03 00 36.7800 -97.5000 374.00 314.00 60.00 219410 SGP 2006 06 29 18 51 00 3744-99 G co CCGG 149.130 -999.990 ... R5 2006 07 24 10 18 00 36.7800 -97.5000 374.00 314.00 60.00 219411 SGP 2006 07 06 19 09 00 2965-99 G co CCGG 219.310 -999.990 .X. R5 2006 07 21 14 52 00 36.7800 -97.5000 374.00 314.00 60.00 219408 SGP 2006 07 06 19 09 00 2966-99 G co CCGG 218.940 -999.990 .X. R5 2006 07 21 15 06 00 36.7800 -97.5000 374.00 314.00 60.00 219409 SGP 2006 07 13 19 00 00 2131-99 G co CCGG 118.960 -999.990 ... R5 2006 08 02 17 38 00 36.7800 -97.5000 374.00 314.00 60.00 220119 SGP 2006 07 13 19 00 00 2132-99 G co CCGG 118.640 -999.990 ... R5 2006 08 02 17 52 00 36.7800 -97.5000 374.00 314.00 60.00 220120 SGP 2006 07 20 19 39 00 1195-99 G co CCGG 185.010 -999.990 .X. R5 2006 08 02 17 10 00 36.7800 -97.5000 374.00 314.00 60.00 220117 SGP 2006 07 20 19 39 00 1196-99 G co CCGG 184.800 -999.990 .X. R5 2006 08 02 17 24 00 36.7800 -97.5000 374.00 314.00 60.00 220118 SGP 2006 07 27 19 00 00 443-99 G co CCGG 120.130 -999.990 ... R5 2006 08 14 14 31 00 36.7800 -97.5000 374.00 314.00 60.00 220650 SGP 2006 07 27 19 00 00 444-99 G co CCGG 119.740 -999.990 ... R5 2006 08 14 14 45 00 36.7800 -97.5000 374.00 314.00 60.00 220651 SGP 2006 08 03 19 15 00 1181-99 G co CCGG 106.930 -999.990 ... R5 2006 08 14 14 03 00 36.7800 -97.5000 374.00 314.00 60.00 220648 SGP 2006 08 03 19 15 00 1182-99 G co CCGG 107.350 -999.990 ... R5 2006 08 14 14 17 00 36.7800 -97.5000 374.00 314.00 60.00 220649 SGP 2006 08 10 20 20 00 3201-99 G co CCGG 104.610 -999.990 ... R5 2006 09 05 13 42 00 36.7800 -97.5000 374.00 314.00 60.00 221557 SGP 2006 08 10 20 20 00 3202-99 G co CCGG 104.930 -999.990 ... R5 2006 09 05 13 56 00 36.7800 -97.5000 374.00 314.00 60.00 221558 SGP 2006 08 17 18 20 00 873-99 G co CCGG 118.300 -999.990 ... R5 2006 09 05 12 45 00 36.7800 -97.5000 374.00 314.00 60.00 221555 SGP 2006 08 17 18 20 00 874-99 G co CCGG 118.780 -999.990 ... R5 2006 09 05 12 59 00 36.7800 -97.5000 374.00 314.00 60.00 221556 SGP 2006 08 24 19 30 00 2823-99 G co CCGG 178.310 -999.990 ... R5 2006 09 14 09 32 00 36.7800 -97.5000 374.00 314.00 60.00 222168 SGP 2006 08 24 19 30 00 2824-99 G co CCGG 176.760 -999.990 ... R5 2006 09 14 09 46 00 36.7800 -97.5000 374.00 314.00 60.00 222169 SGP 2006 08 31 19 15 00 1433-99 G co CCGG 140.080 -999.990 ... R5 2006 09 14 10 00 00 36.7800 -97.5000 374.00 314.00 60.00 222166 SGP 2006 08 31 19 15 00 1434-99 G co CCGG 140.150 -999.990 ... R5 2006 09 14 10 15 00 36.7800 -97.5000 374.00 314.00 60.00 222167 SGP 2006 09 07 19 07 00 241-99 G co CCGG 127.290 -999.990 ... R5 2006 10 03 13 07 00 36.7800 -97.5000 374.00 314.00 60.00 222781 SGP 2006 09 07 19 07 00 242-99 G co CCGG 127.330 -999.990 ... R5 2006 10 03 13 21 00 36.7800 -97.5000 374.00 314.00 60.00 222782 SGP 2006 09 14 19 16 00 1735-99 G co CCGG 159.750 -999.990 ... R5 2006 10 03 13 35 00 36.7800 -97.5000 374.00 314.00 60.00 222783 SGP 2006 09 14 19 16 00 1736-99 G co CCGG 159.580 -999.990 ... R5 2006 10 03 13 49 00 36.7800 -97.5000 374.00 314.00 60.00 222784 SGP 2006 09 21 19 00 00 917-99 G co CCGG 174.080 -999.990 ... R5 2006 10 18 08 50 00 36.7800 -97.5000 374.00 314.00 60.00 223454 SGP 2006 09 21 19 00 00 918-99 G co CCGG 174.140 -999.990 ... R5 2006 10 18 09 05 00 36.7800 -97.5000 374.00 314.00 60.00 223455 SGP 2006 09 27 18 12 00 4607-99 G co CCGG 100.550 -999.990 ... R5 2006 10 18 09 19 00 36.7800 -97.5000 374.00 314.00 60.00 223452 SGP 2006 09 27 18 12 00 4608-99 G co CCGG 100.630 -999.990 ... R5 2006 10 18 09 33 00 36.7800 -97.5000 374.00 314.00 60.00 223453 SGP 2006 10 05 19 26 00 3411-99 G co CCGG 118.650 -999.990 ... R5 2006 10 27 10 40 00 36.7800 -97.5000 374.00 314.00 60.00 223940 SGP 2006 10 05 19 26 00 3412-99 G co CCGG 118.770 -999.990 ... R5 2006 10 27 10 54 00 36.7800 -97.5000 374.00 314.00 60.00 223941 SGP 2006 10 12 19 23 00 833-99 G co CCGG 106.450 -999.990 ... R5 2006 10 27 11 09 00 36.7800 -97.5000 374.00 314.00 60.00 223942 SGP 2006 10 12 19 23 00 834-99 G co CCGG 105.490 -999.990 ... R5 2006 10 27 11 23 00 36.7800 -97.5000 374.00 314.00 60.00 223943 SGP 2006 10 19 19 00 00 1709-99 G co CCGG 109.150 -999.990 ... R5 2006 11 08 09 18 00 36.7800 -97.5000 374.00 314.00 60.00 224529 SGP 2006 10 19 19 00 00 1710-99 G co CCGG 109.390 -999.990 ... R5 2006 11 08 09 33 00 36.7800 -97.5000 374.00 314.00 60.00 224530 SGP 2006 10 26 20 10 00 2871-99 G co CCGG 110.650 -999.990 ... R5 2006 11 08 08 50 00 36.7800 -97.5000 374.00 314.00 60.00 224531 SGP 2006 10 26 20 10 00 2872-99 G co CCGG 110.200 -999.990 ... R5 2006 11 08 09 04 00 36.7800 -97.5000 374.00 314.00 60.00 224532 SGP 2006 11 02 20 34 00 3628-99 G co CCGG 134.480 -999.990 ... R5 2006 11 24 12 28 00 36.7800 -97.5000 374.00 314.00 60.00 225284 SGP 2006 11 09 20 19 00 6217-66 G co CCGG 168.160 -999.990 ... R5 2006 11 17 11 42 00 36.7800 -97.5000 374.00 314.00 60.00 225282 SGP 2006 11 09 20 19 00 6218-66 G co CCGG 168.930 -999.990 ... R5 2006 11 17 11 56 00 36.7800 -97.5000 374.00 314.00 60.00 225283 SGP 2006 11 16 20 05 00 1695-99 G co CCGG 150.120 -999.990 ... R5 2006 12 07 13 24 00 36.7800 -97.5000 374.00 314.00 60.00 225803 SGP 2006 11 16 20 05 00 1696-99 G co CCGG 149.680 -999.990 ... R5 2006 12 07 13 39 00 36.7800 -97.5000 374.00 314.00 60.00 225804 SGP 2006 11 24 20 08 00 2695-99 G co CCGG 143.470 -999.990 ... R5 2006 12 07 12 56 00 36.7800 -97.5000 374.00 314.00 60.00 225801 SGP 2006 11 24 20 08 00 2696-99 G co CCGG 143.510 -999.990 ... R5 2006 12 07 13 10 00 36.7800 -97.5000 374.00 314.00 60.00 225802 SGP 2006 12 01 20 26 00 3989-99 G co CCGG 162.650 -999.990 ... R5 2007 01 03 13 05 00 36.7800 -97.5000 374.00 314.00 60.00 226474 SGP 2006 12 01 20 26 00 3990-99 G co CCGG 164.880 -999.990 ... R5 2007 01 03 13 20 00 36.7800 -97.5000 374.00 314.00 60.00 226475 SGP 2006 12 07 20 21 00 1017-99 G co CCGG 135.730 -999.990 ... R5 2007 01 03 13 34 00 36.7800 -97.5000 374.00 314.00 60.00 226472 SGP 2006 12 07 20 21 00 1018-99 G co CCGG 135.260 -999.990 ... R5 2007 01 03 13 48 00 36.7800 -97.5000 374.00 314.00 60.00 226473 SGP 2006 12 14 21 17 00 1787-99 G co CCGG 146.580 -999.990 ... R5 2007 01 26 11 47 00 36.7800 -97.5000 374.00 314.00 60.00 227381 SGP 2006 12 14 21 17 00 1788-99 G co CCGG 146.830 -999.990 ... R5 2007 01 26 12 01 00 36.7800 -97.5000 374.00 314.00 60.00 227382 SGP 2006 12 21 18 42 00 4117-99 G co CCGG 156.240 -999.990 ... R5 2007 01 26 11 19 00 36.7800 -97.5000 374.00 314.00 60.00 227378 SGP 2006 12 21 18 42 00 4118-99 G co CCGG 155.590 -999.990 ... R5 2007 01 26 11 33 00 36.7800 -97.5000 374.00 314.00 60.00 227379 SGP 2006 12 28 20 00 00 345-99 G co CCGG 144.830 -999.990 ... R5 2007 01 12 12 44 00 36.7800 -97.5000 374.00 314.00 60.00 227741 SGP 2006 12 28 20 00 00 346-99 G co CCGG 144.310 -999.990 ... R5 2007 01 12 12 58 00 36.7800 -97.5000 374.00 314.00 60.00 227742 SGP 2007 01 04 21 06 00 2583-99 G co CCGG 177.370 -999.990 ... R5 2007 01 12 12 16 00 36.7800 -97.5000 374.00 314.00 60.00 227739 SGP 2007 01 04 21 06 00 2584-99 G co CCGG 177.560 -999.990 ... R5 2007 01 12 12 30 00 36.7800 -97.5000 374.00 314.00 60.00 227740 SGP 2007 01 11 21 13 00 3913-99 G co CCGG 141.450 -999.990 ... R5 2007 02 07 10 17 00 36.7800 -97.5000 374.00 314.00 60.00 228384 SGP 2007 01 11 21 13 00 3914-99 G co CCGG 141.830 -999.990 ... R5 2007 02 07 10 31 00 36.7800 -97.5000 374.00 314.00 60.00 228385 SGP 2007 01 18 20 43 00 2181-99 G co CCGG 162.150 -999.990 ... R5 2007 02 07 10 45 00 36.7800 -97.5000 374.00 314.00 60.00 228382 SGP 2007 01 18 20 43 00 2182-99 G co CCGG 162.200 -999.990 ... R5 2007 02 07 10 59 00 36.7800 -97.5000 374.00 314.00 60.00 228383 SGP 2007 01 25 20 04 00 3427-99 G co CCGG 167.300 -999.990 ... R5 2007 02 21 15 28 00 36.7800 -97.5000 374.00 314.00 60.00 229288 SGP 2007 01 25 20 04 00 3428-99 G co CCGG 166.420 -999.990 ... R5 2007 02 21 15 42 00 36.7800 -97.5000 374.00 314.00 60.00 229289 SGP 2007 02 01 20 59 00 829-99 G co CCGG 187.420 -999.990 ... R5 2007 02 21 15 56 00 36.7800 -97.5000 374.00 314.00 60.00 229286 SGP 2007 02 01 20 59 00 830-99 G co CCGG 187.550 -999.990 ... R5 2007 02 21 16 11 00 36.7800 -97.5000 374.00 314.00 60.00 229287 SGP 2007 02 08 21 56 00 3403-99 G co CCGG 179.870 -999.990 ... R5 2007 03 09 11 02 00 36.7800 -97.5000 374.00 314.00 60.00 230140 SGP 2007 02 08 21 56 00 3404-99 G co CCGG 179.400 -999.990 ... R5 2007 03 09 11 16 00 36.7800 -97.5000 374.00 314.00 60.00 230141 SGP 2007 02 15 20 11 00 2865-99 G co CCGG 160.520 -999.990 ... R5 2007 03 09 11 30 00 36.7800 -97.5000 374.00 314.00 60.00 230142 SGP 2007 02 15 20 11 00 2866-99 G co CCGG 161.390 -999.990 ... R5 2007 03 09 11 44 00 36.7800 -97.5000 374.00 314.00 60.00 230143 SGP 2007 02 22 19 51 00 6053-66 G co CCGG 154.770 -999.990 ... R5 2007 03 15 11 44 00 36.7800 -97.5000 374.00 314.00 60.00 230885 SGP 2007 02 22 19 51 00 6054-66 G co CCGG 155.490 -999.990 ... R5 2007 03 15 11 58 00 36.7800 -97.5000 374.00 314.00 60.00 230886 SGP 2007 03 01 20 00 00 1131-99 G co CCGG 152.370 -999.990 ... R5 2007 03 15 12 12 00 36.7800 -97.5000 374.00 314.00 60.00 230883 SGP 2007 03 01 20 00 00 1132-99 G co CCGG 152.690 -999.990 ... R5 2007 03 15 12 26 00 36.7800 -97.5000 374.00 314.00 60.00 230884 SGP 2007 03 08 21 05 00 3011-99 G co CCGG 227.620 -999.990 .X. R5 2007 04 03 13 05 00 36.7800 -97.5000 374.00 314.00 60.00 231667 SGP 2007 03 08 21 05 00 3012-99 G co CCGG 228.890 -999.990 .X. R5 2007 04 03 13 20 00 36.7800 -97.5000 374.00 314.00 60.00 231668 SGP 2007 03 15 18 30 00 1125-99 G co CCGG 164.860 -999.990 ... R5 2007 04 03 13 34 00 36.7800 -97.5000 374.00 314.00 60.00 231665 SGP 2007 03 15 18 30 00 1126-99 G co CCGG 164.580 -999.990 ... R5 2007 04 03 13 48 00 36.7800 -97.5000 374.00 314.00 60.00 231666 SGP 2007 03 22 19 56 00 393-99 G co CCGG 146.120 -999.990 ... R5 2007 04 16 09 19 00 36.7800 -97.5000 374.00 314.00 60.00 232326 SGP 2007 03 22 19 56 00 394-99 G co CCGG 145.980 -999.990 ... R5 2007 04 16 09 33 00 36.7800 -97.5000 374.00 314.00 60.00 232327 SGP 2007 03 29 19 10 00 1955-99 G co CCGG 145.700 -999.990 ... R5 2007 04 16 08 50 00 36.7800 -97.5000 374.00 314.00 60.00 232324 SGP 2007 03 29 19 10 00 1956-99 G co CCGG 147.040 -999.990 ... R5 2007 04 16 09 04 00 36.7800 -97.5000 374.00 314.00 60.00 232325 SGP 2007 04 05 19 43 00 2273-99 G co CCGG 164.680 -999.990 ... R5 2007 05 01 10 55 00 36.7800 -97.5000 374.00 314.00 60.00 233132 SGP 2007 04 05 19 43 00 2274-99 G co CCGG 165.000 -999.990 ... R5 2007 05 01 11 09 00 36.7800 -97.5000 374.00 314.00 60.00 233133 SGP 2007 04 12 20 50 00 803-99 G co CCGG 185.200 -999.990 ... R5 2007 05 01 11 23 00 36.7800 -97.5000 374.00 314.00 60.00 233130 SGP 2007 04 12 20 50 00 804-99 G co CCGG 185.640 -999.990 ... R5 2007 05 01 11 37 00 36.7800 -97.5000 374.00 314.00 60.00 233131 SGP 2007 04 26 19 03 00 1250-99 G co CCGG 156.440 -999.990 ... R5 2007 05 17 13 19 00 36.7800 -97.5000 374.00 314.00 60.00 234071 SGP 2007 04 26 19 03 00 1997-99 G co CCGG 156.500 -999.990 ... R5 2007 05 17 13 33 00 36.7800 -97.5000 374.00 314.00 60.00 234072 SGP 2007 05 03 20 14 00 3298-99 G co CCGG 171.670 -999.990 ... R5 2007 05 17 13 47 00 36.7800 -97.5000 374.00 314.00 60.00 234069 SGP 2007 05 03 20 14 00 4536-99 G co CCGG 171.810 -999.990 ... R5 2007 05 17 14 02 00 36.7800 -97.5000 374.00 314.00 60.00 234070 SGP 2007 05 10 19 22 00 625-99 G co CCGG 140.260 -999.990 ... R5 2007 06 07 15 25 00 36.7800 -97.5000 374.00 314.00 60.00 235352 SGP 2007 05 10 19 22 00 626-99 G co CCGG 139.480 -999.990 ... R5 2007 06 07 15 39 00 36.7800 -97.5000 374.00 314.00 60.00 235353 SGP 2007 05 17 20 23 00 3385-99 G co CCGG 160.630 -999.990 ... R5 2007 06 07 14 00 00 36.7800 -97.5000 374.00 314.00 60.00 235350 SGP 2007 05 17 20 23 00 3386-99 G co CCGG 160.940 -999.990 ... R5 2007 06 07 14 14 00 36.7800 -97.5000 374.00 314.00 60.00 235351 SGP 2007 05 24 19 06 00 1355-99 G co CCGG 141.600 -999.990 ... R5 2007 06 19 12 35 00 36.7800 -97.5000 374.00 314.00 60.00 235973 SGP 2007 05 24 19 06 00 1356-99 G co CCGG 141.250 -999.990 ... R5 2007 06 19 12 49 00 36.7800 -97.5000 374.00 314.00 60.00 235974 SGP 2007 05 31 20 17 00 2941-99 G co CCGG 140.010 -999.990 ... R5 2007 06 19 12 06 00 36.7800 -97.5000 374.00 314.00 60.00 235971 SGP 2007 05 31 20 17 00 2942-99 G co CCGG 139.560 -999.990 ... R5 2007 06 19 12 21 00 36.7800 -97.5000 374.00 314.00 60.00 235972 SGP 2007 06 07 18 26 00 2959-99 G co CCGG 139.260 -999.990 ... R5 2007 06 26 14 57 00 36.7800 -97.5000 374.00 314.00 60.00 236625 SGP 2007 06 07 18 26 00 2960-99 G co CCGG 138.880 -999.990 ... R5 2007 06 26 15 11 00 36.7800 -97.5000 374.00 314.00 60.00 236626 SGP 2007 06 14 19 51 00 3539-99 G co CCGG 142.070 -999.990 ... R5 2007 06 26 16 22 00 36.7800 -97.5000 374.00 314.00 60.00 236623 SGP 2007 06 14 19 51 00 3540-99 G co CCGG 141.250 -999.990 ... R5 2007 06 26 16 36 00 36.7800 -97.5000 374.00 314.00 60.00 236624 SGP 2007 06 20 19 47 00 1645-99 G co CCGG 127.750 -999.990 ... R5 2007 07 12 11 18 00 36.7800 -97.5000 374.00 314.00 60.00 238029 SGP 2007 06 20 19 47 00 1646-99 G co CCGG 127.380 -999.990 ... R5 2007 07 12 11 32 00 36.7800 -97.5000 374.00 314.00 60.00 238030 SGP 2007 06 28 20 57 00 2547-99 G co CCGG 112.070 -999.990 ... R5 2007 07 12 10 49 00 36.7800 -97.5000 374.00 314.00 60.00 238027 SGP 2007 06 28 20 57 00 2548-99 G co CCGG 112.410 -999.990 ... R5 2007 07 12 11 03 00 36.7800 -97.5000 374.00 314.00 60.00 238028 SGP 2007 07 05 19 27 00 4759-99 G co CCGG 122.920 -999.990 ... R5 2007 07 24 12 25 00 36.7800 -97.5000 374.00 314.00 60.00 238571 SGP 2007 07 05 19 27 00 4760-99 G co CCGG 122.830 -999.990 ... R5 2007 07 24 12 40 00 36.7800 -97.5000 374.00 314.00 60.00 238572 SGP 2007 07 12 20 13 00 3563-99 G co CCGG 125.880 -999.990 ... R5 2007 07 24 10 55 00 36.7800 -97.5000 374.00 314.00 60.00 238569 SGP 2007 07 12 20 13 00 3564-99 G co CCGG 124.650 -999.990 ... R5 2007 07 24 11 09 00 36.7800 -97.5000 374.00 314.00 60.00 238570 SGP 2007 07 19 19 53 00 919-99 G co CCGG 84.260 -999.990 ... R5 2007 08 06 17 07 00 36.7800 -97.5000 374.00 314.00 60.00 239583 SGP 2007 07 19 19 53 00 920-99 G co CCGG 84.010 -999.990 ... R5 2007 08 06 17 21 00 36.7800 -97.5000 374.00 314.00 60.00 239584 SGP 2007 07 26 20 22 00 1107-99 G co CCGG 126.070 -999.990 ... R5 2007 08 06 17 36 00 36.7800 -97.5000 374.00 314.00 60.00 239581 SGP 2007 07 26 20 22 00 1108-99 G co CCGG 125.580 -999.990 ... R5 2007 08 06 17 50 00 36.7800 -97.5000 374.00 314.00 60.00 239582 SGP 2007 08 02 19 03 00 2965-99 G co CCGG 189.170 -999.990 .X. R5 2007 08 15 10 31 00 36.7800 -97.5000 374.00 314.00 60.00 239964 SGP 2007 08 02 19 03 00 2966-99 G co CCGG 188.300 -999.990 .X. R5 2007 08 15 10 45 00 36.7800 -97.5000 374.00 314.00 60.00 239965 SGP 2007 08 09 18 16 00 1659-99 G co CCGG 131.200 -999.990 ... R5 2007 08 15 10 59 00 36.7800 -97.5000 374.00 314.00 60.00 239966 SGP 2007 08 09 18 16 00 1660-99 G co CCGG 131.070 -999.990 ... R5 2007 08 15 11 14 00 36.7800 -97.5000 374.00 314.00 60.00 239967 SGP 2007 08 16 20 11 00 3385-99 G co CCGG 225.100 -999.990 .X. R5 2007 09 04 15 11 00 36.7800 -97.5000 374.00 314.00 60.00 240794 SGP 2007 08 16 20 11 00 3386-99 G co CCGG 225.520 -999.990 .X. R5 2007 09 04 15 25 00 36.7800 -97.5000 374.00 314.00 60.00 240795 SGP 2007 08 23 19 33 00 1595-99 G co CCGG 99.970 -999.990 ... R5 2007 09 04 15 39 00 36.7800 -97.5000 374.00 314.00 60.00 240792 SGP 2007 08 23 19 33 00 1596-99 G co CCGG 100.540 -999.990 ... R5 2007 09 04 15 54 00 36.7800 -97.5000 374.00 314.00 60.00 240793 SGP 2007 08 30 19 58 00 1173-99 G co CCGG 126.140 -999.990 ... R5 2007 09 17 12 20 00 36.7800 -97.5000 374.00 314.00 60.00 241521 SGP 2007 08 30 19 58 00 1174-99 G co CCGG 126.830 -999.990 ... R5 2007 09 17 12 34 00 36.7800 -97.5000 374.00 314.00 60.00 241522 SGP 2007 09 06 19 34 00 4575-99 G co CCGG 107.380 -999.990 ... R5 2007 09 17 12 48 00 36.7800 -97.5000 374.00 314.00 60.00 241519 SGP 2007 09 06 19 34 00 4576-99 G co CCGG 106.990 -999.990 ... R5 2007 09 17 13 03 00 36.7800 -97.5000 374.00 314.00 60.00 241520 SGP 2007 09 13 19 59 00 2993-99 G co CCGG 154.680 -999.990 ... R5 2007 09 26 17 07 00 36.7800 -97.5000 374.00 314.00 60.00 242349 SGP 2007 09 13 19 59 00 4237-99 G co CCGG 154.580 -999.990 ... R5 2007 09 26 17 22 00 36.7800 -97.5000 374.00 314.00 60.00 242350 SGP 2007 09 20 18 57 00 6665-66 G co CCGG 152.570 -999.990 ... R5 2007 09 26 16 39 00 36.7800 -97.5000 374.00 314.00 60.00 242347 SGP 2007 09 20 18 57 00 6666-66 G co CCGG 151.520 -999.990 ... R5 2007 09 26 16 53 00 36.7800 -97.5000 374.00 314.00 60.00 242348 SGP 2007 09 27 19 55 00 857-99 G co CCGG 134.930 -999.990 ... R6 2007 10 16 14 53 00 36.7800 -97.5000 374.00 314.00 60.00 243349 SGP 2007 09 27 19 55 00 858-99 G co CCGG 134.870 -999.990 ... R6 2007 10 16 15 07 00 36.7800 -97.5000 374.00 314.00 60.00 243350 SGP 2007 10 04 19 40 00 471-99 G co CCGG 166.210 -999.990 ... R5 2007 10 16 15 28 00 36.7800 -97.5000 374.00 314.00 60.00 243351 SGP 2007 10 04 19 40 00 472-99 G co CCGG 165.840 -999.990 ... R5 2007 10 16 15 42 00 36.7800 -97.5000 374.00 314.00 60.00 243352 SGP 2007 10 11 19 35 00 3055-99 G co CCGG 114.320 -999.990 ... R5 2007 10 26 14 49 00 36.7800 -97.5000 374.00 314.00 60.00 243894 SGP 2007 10 11 19 35 00 3056-99 G co CCGG 115.510 -999.990 ... R5 2007 10 26 15 04 00 36.7800 -97.5000 374.00 314.00 60.00 243895 SGP 2007 10 18 19 57 00 39-99 G co CCGG 107.100 -999.990 ... R6 2007 10 26 15 07 00 36.7800 -97.5000 374.00 314.00 60.00 243892 SGP 2007 10 18 19 57 00 40-99 G co CCGG 107.530 -999.990 ... R6 2007 10 26 15 22 00 36.7800 -97.5000 374.00 314.00 60.00 243893 SGP 2007 10 25 19 42 00 3743-99 G co CCGG 136.710 -999.990 ... R5 2007 11 15 13 06 00 36.7800 -97.5000 374.00 314.00 60.00 244867 SGP 2007 10 25 19 42 00 3744-99 G co CCGG 135.710 -999.990 ... R5 2007 11 15 13 20 00 36.7800 -97.5000 374.00 314.00 60.00 244868 SGP 2007 11 01 20 03 00 3455-99 G co CCGG 110.160 -999.990 P.. R5 2007 11 15 12 37 00 36.7800 -97.5000 374.00 314.00 60.00 244869 SGP 2007 11 01 20 03 00 3455-99 G co CCGG 127.330 -999.990 P.. R5 2007 11 15 14 31 00 36.7800 -97.5000 374.00 314.00 60.00 244869 SGP 2007 11 01 20 03 00 3456-99 G co CCGG 118.590 -999.990 P.. R5 2007 11 15 12 51 00 36.7800 -97.5000 374.00 314.00 60.00 244870 SGP 2007 11 01 20 03 00 3456-99 G co CCGG 127.770 -999.990 P.. R5 2007 11 15 14 45 00 36.7800 -97.5000 374.00 314.00 60.00 244870 SGP 2007 11 08 12 34 56 2751-99 G co CCGG 160.430 -999.990 ... R5 2007 11 29 15 35 00 36.7800 -97.5000 374.00 314.00 60.00 245478 SGP 2007 11 08 12 34 56 2752-99 G co CCGG 160.160 -999.990 ... R5 2007 11 29 15 49 00 36.7800 -97.5000 374.00 314.00 60.00 245479 SGP 2007 11 15 21 02 00 2341-99 G co CCGG 123.510 -999.990 ... R5 2007 11 29 16 03 00 36.7800 -97.5000 374.00 314.00 60.00 245476 SGP 2007 11 15 21 02 00 2342-99 G co CCGG 122.980 -999.990 ... R5 2007 11 29 16 18 00 36.7800 -97.5000 374.00 314.00 60.00 245477 SGP 2007 11 21 20 13 00 1951-99 G co CCGG 127.990 -999.990 ... R5 2007 12 13 13 49 00 36.7800 -97.5000 374.00 314.00 60.00 246121 SGP 2007 11 21 20 13 00 1952-99 G co CCGG 128.550 -999.990 ... R5 2007 12 13 14 03 00 36.7800 -97.5000 374.00 314.00 60.00 246122 SGP 2007 11 29 20 40 00 1753-99 G co CCGG 143.850 -999.990 ... R5 2007 12 13 14 46 00 36.7800 -97.5000 374.00 314.00 60.00 246119 SGP 2007 11 29 20 40 00 1754-99 G co CCGG 144.650 -999.990 ... R5 2007 12 13 15 00 00 36.7800 -97.5000 374.00 314.00 60.00 246120 SGP 2007 12 06 21 31 00 1976-99 G co CCGG 191.310 -999.990 ... R5 2008 01 03 14 17 00 36.7800 -97.5000 374.00 314.00 60.00 247163 SGP 2007 12 06 21 31 00 4411-99 G co CCGG 191.260 -999.990 ... R5 2008 01 03 14 31 00 36.7800 -97.5000 374.00 314.00 60.00 247162 SGP 2007 12 13 12 34 56 1114-99 G co CCGG 151.610 -999.990 ... R5 2008 01 03 13 49 00 36.7800 -97.5000 374.00 314.00 60.00 247160 SGP 2007 12 13 12 34 56 4792-99 G co CCGG 150.610 -999.990 ... R5 2008 01 03 14 03 00 36.7800 -97.5000 374.00 314.00 60.00 247161 SGP 2007 12 21 20 26 00 2017-99 G co CCGG 152.520 -999.990 ... R5 2008 01 18 12 17 00 36.7800 -97.5000 374.00 314.00 60.00 247756 SGP 2007 12 21 20 26 00 2018-99 G co CCGG 152.100 -999.990 ... R5 2008 01 18 12 31 00 36.7800 -97.5000 374.00 314.00 60.00 247757 SGP 2007 12 27 20 05 00 535-99 G co CCGG 162.070 -999.990 ... R5 2008 01 18 12 45 00 36.7800 -97.5000 374.00 314.00 60.00 247758 SGP 2007 12 27 20 05 00 536-99 G co CCGG 162.390 -999.990 ... R5 2008 01 18 12 59 00 36.7800 -97.5000 374.00 314.00 60.00 247759 SGP 2008 01 03 20 24 00 4937-99 G co CCGG 161.180 -999.990 ... R5 2008 01 29 13 24 00 36.7800 -97.5000 374.00 314.00 60.00 248552 SGP 2008 01 03 20 24 00 4938-99 G co CCGG 161.290 -999.990 ... R5 2008 01 29 13 39 00 36.7800 -97.5000 374.00 314.00 60.00 248553 SGP 2008 01 10 20 57 00 4927-99 G co CCGG 146.550 -999.990 ... R5 2008 01 29 12 56 00 36.7800 -97.5000 374.00 314.00 60.00 248554 SGP 2008 01 10 20 57 00 4928-99 G co CCGG 146.780 -999.990 ... R5 2008 01 29 13 10 00 36.7800 -97.5000 374.00 314.00 60.00 248555 SGP 2008 01 17 20 58 00 2003-99 G co CCGG 140.630 -999.990 ... V2 2008 02 05 17 09 00 36.7800 -97.5000 374.00 314.00 60.00 248949 SGP 2008 01 17 20 58 00 2004-99 G co CCGG 140.680 -999.990 ... V2 2008 02 05 17 25 00 36.7800 -97.5000 374.00 314.00 60.00 248950 SGP 2008 01 24 20 13 00 4235-99 G co CCGG 166.170 -999.990 ... V2 2008 02 05 17 40 00 36.7800 -97.5000 374.00 314.00 60.00 248951 SGP 2008 01 24 20 13 00 4236-99 G co CCGG 165.810 -999.990 ... V2 2008 02 05 17 55 00 36.7800 -97.5000 374.00 314.00 60.00 248952 SGP 2008 02 01 12 34 56 2181-99 G co CCGG 173.160 -999.990 ... V2 2008 02 21 16 34 00 36.7800 -97.5000 374.00 314.00 60.00 249681 SGP 2008 02 01 12 34 56 2182-99 G co CCGG 173.020 -999.990 ... V2 2008 02 21 16 50 00 36.7800 -97.5000 374.00 314.00 60.00 249682 SGP 2008 02 07 19 53 00 725-99 G co CCGG 148.220 -999.990 ... V2 2008 02 21 16 03 00 36.7800 -97.5000 374.00 314.00 60.00 249679 SGP 2008 02 07 19 53 00 726-99 G co CCGG 148.380 -999.990 ... V2 2008 02 21 16 19 00 36.7800 -97.5000 374.00 314.00 60.00 249680 SGP 2008 02 14 20 36 00 4575-99 G co CCGG 161.840 -999.990 ... R5 2008 03 05 10 44 00 36.7800 -97.5000 374.00 314.00 60.00 250258 SGP 2008 02 14 20 36 00 4576-99 G co CCGG 161.260 -999.990 ... R5 2008 03 05 10 59 00 36.7800 -97.5000 374.00 314.00 60.00 250259 SGP 2008 02 21 20 25 00 6035-66 G co CCGG 185.500 -999.990 ... R5 2008 03 05 11 13 00 36.7800 -97.5000 374.00 314.00 60.00 250256 SGP 2008 02 21 20 25 00 6036-66 G co CCGG 185.470 -999.990 ... R5 2008 03 05 11 27 00 36.7800 -97.5000 374.00 314.00 60.00 250257 SGP 2008 02 28 20 45 00 3461-99 G co CCGG 160.250 -999.990 ... V2 2008 03 19 12 12 00 36.7800 -97.5000 374.00 314.00 60.00 251101 SGP 2008 02 28 20 45 00 3462-99 G co CCGG 160.380 -999.990 ... V2 2008 03 19 12 27 00 36.7800 -97.5000 374.00 314.00 60.00 251102 SGP 2008 03 06 20 47 00 1847-99 G co CCGG 166.750 -999.990 ... V2 2008 03 19 12 43 00 36.7800 -97.5000 374.00 314.00 60.00 251099 SGP 2008 03 06 20 47 00 1848-99 G co CCGG 166.890 -999.990 ... V2 2008 03 19 12 58 00 36.7800 -97.5000 374.00 314.00 60.00 251100 SGP 2008 03 13 18 56 00 1375-99 G co CCGG 190.140 -999.990 ... R5 2008 04 03 13 45 00 36.7800 -97.5000 374.00 314.00 60.00 251861 SGP 2008 03 13 18 56 00 1376-99 G co CCGG 192.100 -999.990 ... R5 2008 04 03 14 00 00 36.7800 -97.5000 374.00 314.00 60.00 251862 SGP 2008 03 20 20 06 00 2905-99 G co CCGG 155.670 -999.990 ... R5 2008 04 03 13 17 00 36.7800 -97.5000 374.00 314.00 60.00 251859 SGP 2008 03 20 20 06 00 2906-99 G co CCGG 156.520 -999.990 ... R5 2008 04 03 13 31 00 36.7800 -97.5000 374.00 314.00 60.00 251860 SGP 2008 03 27 19 17 00 4763-99 G co CCGG 203.680 -999.990 ... R5 2008 04 16 16 22 00 36.7800 -97.5000 374.00 314.00 60.00 252578 SGP 2008 03 27 19 17 00 4764-99 G co CCGG 206.410 -999.990 ... R5 2008 04 16 16 37 00 36.7800 -97.5000 374.00 314.00 60.00 252579 SGP 2008 04 03 18 54 00 4139-99 G co CCGG 188.830 -999.990 ... R5 2008 04 16 15 54 00 36.7800 -97.5000 374.00 314.00 60.00 252580 SGP 2008 04 03 18 54 00 4140-99 G co CCGG 188.240 -999.990 ... R5 2008 04 16 16 08 00 36.7800 -97.5000 374.00 314.00 60.00 252581 SGP 2008 04 10 19 30 00 4379-99 G co CCGG 152.660 -999.990 ... V2 2008 04 30 09 24 00 36.7800 -97.5000 374.00 314.00 60.00 253289 SGP 2008 04 10 19 30 00 4380-99 G co CCGG 152.860 -999.990 ... V2 2008 04 30 09 39 00 36.7800 -97.5000 374.00 314.00 60.00 253290 SGP 2008 04 17 19 19 00 3113-99 G co CCGG 148.560 -999.990 ... R5 2008 04 30 09 50 00 36.7800 -97.5000 374.00 314.00 60.00 253287 SGP 2008 04 17 19 19 00 3114-99 G co CCGG 148.380 -999.990 ... R5 2008 04 30 10 04 00 36.7800 -97.5000 374.00 314.00 60.00 253288 SGP 2008 04 24 19 45 00 461-99 G co CCGG 151.600 -999.990 ... V2 2008 05 19 13 12 00 36.8000 -97.5000 374.00 314.00 60.00 254282 SGP 2008 04 24 19 45 00 462-99 G co CCGG 150.740 -999.990 ... V2 2008 05 19 13 28 00 36.8000 -97.5000 374.00 314.00 60.00 254283 SGP 2008 05 01 19 18 00 2565-99 G co CCGG 163.790 -999.990 ... V2 2008 05 19 13 43 00 36.8000 -97.5000 374.00 314.00 60.00 254284 SGP 2008 05 01 19 18 00 2566-99 G co CCGG 163.890 -999.990 ... V2 2008 05 19 13 58 00 36.8000 -97.5000 374.00 314.00 60.00 254285 SGP 2008 05 08 18 56 00 3361-99 G co CCGG 150.120 -999.990 ... V2 2008 06 02 13 19 00 36.8000 -97.5000 374.00 314.00 60.00 254839 SGP 2008 05 08 18 56 00 3362-99 G co CCGG 150.380 -999.990 ... V2 2008 06 02 13 34 00 36.8000 -97.5000 374.00 314.00 60.00 254840 SGP 2008 05 15 19 24 00 327-99 G co CCGG 159.830 -999.990 ... V2 2008 06 02 13 49 00 36.8000 -97.5000 374.00 314.00 60.00 254837 SGP 2008 05 15 19 24 00 328-99 G co CCGG 159.250 -999.990 ... V2 2008 06 02 14 05 00 36.8000 -97.5000 374.00 314.00 60.00 254838 SGP 2008 05 22 19 44 00 4953-99 G co CCGG 190.620 -999.990 ... V2 2008 06 11 10 58 00 36.8000 -97.5000 374.00 314.00 60.00 255340 SGP 2008 05 22 19 44 00 4954-99 G co CCGG 190.640 -999.990 ... V2 2008 06 11 11 14 00 36.8000 -97.5000 374.00 314.00 60.00 255341 SGP 2008 05 29 20 28 00 4961-99 G co CCGG 174.180 -999.990 ... V2 2008 06 11 11 29 00 36.8000 -97.5000 374.00 314.00 60.00 255338 SGP 2008 05 29 20 28 00 4962-99 G co CCGG 173.710 -999.990 ... V2 2008 06 11 11 44 00 36.8000 -97.5000 374.00 314.00 60.00 255339 SGP 2008 06 05 19 14 00 3113-99 G co CCGG 110.790 -999.990 ... V2 2008 06 26 11 26 00 36.8000 -97.5000 374.00 314.00 60.00 256280 SGP 2008 06 05 19 14 00 3114-99 G co CCGG 110.580 -999.990 ... V2 2008 06 26 11 42 00 36.8000 -97.5000 374.00 314.00 60.00 256281 SGP 2008 06 12 20 16 00 2759-99 G co CCGG 105.970 -999.990 ... V2 2008 06 25 14 46 00 36.8000 -97.5000 374.00 314.00 60.00 256282 SGP 2008 06 12 20 16 00 2760-99 G co CCGG 106.000 -999.990 ... V2 2008 06 25 15 01 00 36.8000 -97.5000 374.00 314.00 60.00 256283 SGP 2008 06 19 19 19 00 2615-99 G co CCGG 144.640 -999.990 P.. R5 2008 07 16 14 30 00 36.8000 -97.5000 374.00 314.00 60.00 257357 SGP 2008 06 19 19 19 00 2616-99 G co CCGG 147.940 -999.990 P.. R5 2008 07 16 14 45 00 36.8000 -97.5000 374.00 314.00 60.00 257358 SGP 2008 06 26 18 51 00 4473-99 G co CCGG 122.850 -999.990 ... R5 2008 07 16 14 59 00 36.8000 -97.5000 374.00 314.00 60.00 257359 SGP 2008 06 26 18 51 00 4474-99 G co CCGG 122.900 -999.990 ... R5 2008 07 16 15 13 00 36.8000 -97.5000 374.00 314.00 60.00 257360 SGP 2008 07 03 19 09 00 2653-99 G co CCGG 284.040 -999.990 .X. V2 2008 07 22 16 22 00 36.8000 -97.5000 374.00 314.00 60.00 257781 SGP 2008 07 03 19 09 00 2654-99 G co CCGG 284.270 -999.990 .X. V2 2008 07 22 16 37 00 36.8000 -97.5000 374.00 314.00 60.00 257782 SGP 2008 07 10 19 09 00 6921-66 G co CCGG 123.070 -999.990 ... V2 2008 07 22 14 50 00 36.8000 -97.5000 374.00 314.00 60.00 257779 SGP 2008 07 10 19 09 00 6922-66 G co CCGG 122.760 -999.990 ... V2 2008 07 22 15 05 00 36.8000 -97.5000 374.00 314.00 60.00 257780 SGP 2008 07 17 19 48 00 4219-99 G co CCGG 195.090 -999.990 .X. V2 2008 08 06 11 53 00 36.8000 -97.5000 374.00 314.00 60.00 258740 SGP 2008 07 17 19 48 00 4220-99 G co CCGG 192.520 -999.990 .X. V2 2008 08 06 12 08 00 36.8000 -97.5000 374.00 314.00 60.00 258741 SGP 2008 07 24 19 25 00 1331-99 G co CCGG 130.080 -999.990 ... V2 2008 08 06 12 23 00 36.8000 -97.5000 374.00 314.00 60.00 258738 SGP 2008 07 24 19 25 00 1332-99 G co CCGG 129.930 -999.990 ... V2 2008 08 06 12 39 00 36.8000 -97.5000 374.00 314.00 60.00 258739 SGP 2008 07 31 19 30 00 3701-99 G co CCGG 130.310 -999.990 ... V2 2008 08 13 14 15 00 36.8000 -97.5000 374.00 314.00 60.00 259372 SGP 2008 07 31 19 30 00 3702-99 G co CCGG 130.790 -999.990 ... V2 2008 08 13 14 30 00 36.8000 -97.5000 374.00 314.00 60.00 259373 SGP 2008 08 07 19 08 00 2171-99 G co CCGG 139.050 -999.990 ... V2 2008 08 13 14 45 00 36.8000 -97.5000 374.00 314.00 60.00 259374 SGP 2008 08 07 19 08 00 2172-99 G co CCGG 139.100 -999.990 ... V2 2008 08 13 15 01 00 36.8000 -97.5000 374.00 314.00 60.00 259375 SGP 2008 08 14 19 13 00 1549-99 G co CCGG 141.750 -999.990 ... R5 2008 09 04 12 24 00 36.8000 -97.5000 374.00 314.00 60.00 260026 SGP 2008 08 14 19 13 00 1550-99 G co CCGG 141.170 -999.990 ... R5 2008 09 04 12 39 00 36.8000 -97.5000 374.00 314.00 60.00 260027 SGP 2008 08 21 19 23 00 5011-99 G co CCGG 125.670 -999.990 ... R5 2008 09 04 12 53 00 36.8000 -97.5000 374.00 314.00 60.00 260024 SGP 2008 08 21 19 23 00 5012-99 G co CCGG 124.330 -999.990 ... R5 2008 09 04 13 07 00 36.8000 -97.5000 374.00 314.00 60.00 260025 SGP 2008 08 28 19 18 00 4351-99 G co CCGG 117.160 -999.990 ... V2 2008 09 19 12 48 00 36.8000 -97.5000 374.00 314.00 60.00 261095 SGP 2008 08 28 19 18 00 4352-99 G co CCGG 117.430 -999.990 ... V2 2008 09 19 13 03 00 36.8000 -97.5000 374.00 314.00 60.00 261096 SGP 2008 09 04 19 35 00 3393-99 G co CCGG 98.280 -999.990 ... V2 2008 09 19 12 17 00 36.8000 -97.5000 374.00 314.00 60.00 261097 SGP 2008 09 04 19 35 00 3394-99 G co CCGG 98.430 -999.990 ... V2 2008 09 19 12 32 00 36.8000 -97.5000 374.00 314.00 60.00 261098 SGP 2008 09 11 19 12 00 4917-99 G co CCGG 157.670 -999.990 ... R5 2008 10 01 13 27 00 36.8000 -97.5000 374.00 314.00 60.00 261722 SGP 2008 09 11 19 12 00 4918-99 G co CCGG 158.040 -999.990 ... R5 2008 10 01 13 41 00 36.8000 -97.5000 374.00 314.00 60.00 261723 SGP 2008 09 18 19 28 00 247-99 G co CCGG 134.840 -999.990 ... R5 2008 10 01 13 59 00 36.8000 -97.5000 374.00 314.00 60.00 261724 SGP 2008 09 18 19 28 00 248-99 G co CCGG 135.890 -999.990 ... R5 2008 10 01 14 13 00 36.8000 -97.5000 374.00 314.00 60.00 261725 SGP 2008 09 25 19 04 00 359-99 G co CCGG 133.060 -999.990 ... R5 2008 10 16 16 35 00 36.8000 -97.5000 374.00 314.00 60.00 262373 SGP 2008 09 25 19 04 00 360-99 G co CCGG 132.920 -999.990 ... R5 2008 10 16 16 50 00 36.8000 -97.5000 374.00 314.00 60.00 262374 SGP 2008 10 02 19 23 00 3051-99 G co CCGG 107.510 -999.990 ... R5 2008 10 16 16 07 00 36.8000 -97.5000 374.00 314.00 60.00 262371 SGP 2008 10 02 19 23 00 3052-99 G co CCGG 106.640 -999.990 ... R5 2008 10 16 16 21 00 36.8000 -97.5000 374.00 314.00 60.00 262372 SGP 2008 10 09 19 02 00 4979-99 G co CCGG 152.510 -999.990 ... V2 2008 10 29 13 04 00 36.8000 -97.5000 374.00 314.00 60.00 263127 SGP 2008 10 09 19 02 00 4980-99 G co CCGG 152.370 -999.990 ... V2 2008 10 29 13 19 00 36.8000 -97.5000 374.00 314.00 60.00 263128 SGP 2008 10 16 21 07 00 1015-99 G co CCGG 108.310 -999.990 ... V2 2008 10 29 13 35 00 36.8000 -97.5000 374.00 314.00 60.00 263129 SGP 2008 10 16 21 07 00 1016-99 G co CCGG 108.430 -999.990 ... V2 2008 10 29 13 50 00 36.8000 -97.5000 374.00 314.00 60.00 263130 SGP 2008 10 24 19 10 00 288-99 G co CCGG 128.920 -999.990 ... V2 2008 11 13 13 46 00 36.8000 -97.5000 374.00 314.00 60.00 263761 SGP 2008 10 24 19 10 00 4046-99 G co CCGG 128.420 -999.990 ... V2 2008 11 13 14 01 00 36.8000 -97.5000 374.00 314.00 60.00 263762 SGP 2008 10 30 19 18 00 2603-99 G co CCGG 137.140 -999.990 ... V2 2008 11 13 13 31 00 36.8000 -97.5000 374.00 314.00 60.00 263760 SGP 2008 10 30 19 18 00 745-99 G co CCGG 137.560 -999.990 ... V2 2008 11 13 13 15 00 36.8000 -97.5000 374.00 314.00 60.00 263759 SGP 2008 11 06 20 11 00 975-99 G co CCGG 114.940 -999.990 ... V2 2008 12 02 13 25 00 36.8000 -97.5000 374.00 314.00 60.00 264619 SGP 2008 11 06 20 11 00 976-99 G co CCGG 114.910 -999.990 ... V2 2008 12 02 13 40 00 36.8000 -97.5000 374.00 314.00 60.00 264620 SGP 2008 11 13 20 08 00 1205-99 G co CCGG 134.460 -999.990 ... V2 2008 12 02 13 55 00 36.8000 -97.5000 374.00 314.00 60.00 264617 SGP 2008 11 13 20 08 00 1206-99 G co CCGG 134.600 -999.990 ... V2 2008 12 02 14 11 00 36.8000 -97.5000 374.00 314.00 60.00 264618 SGP 2008 11 20 20 40 00 2977-99 G co CCGG 129.320 -999.990 ... V2 2008 12 11 12 41 00 36.8000 -97.5000 374.00 314.00 60.00 265281 SGP 2008 11 20 20 40 00 2978-99 G co CCGG 129.500 -999.990 ... V2 2008 12 11 12 56 00 36.8000 -97.5000 374.00 314.00 60.00 265282 SGP 2008 11 28 19 59 00 929-99 G co CCGG 137.420 -999.990 ... V2 2008 12 11 12 10 00 36.8000 -97.5000 374.00 314.00 60.00 265283 SGP 2008 11 28 19 59 00 930-99 G co CCGG 137.720 -999.990 ... V2 2008 12 11 12 26 00 36.8000 -97.5000 374.00 314.00 60.00 265284 SGP 2008 12 04 20 56 00 2753-99 G co CCGG 120.750 -999.990 ... R5 2008 12 29 11 05 00 36.8000 -97.5000 374.00 314.00 60.00 266262 SGP 2008 12 04 20 56 00 2754-99 G co CCGG 121.010 -999.990 ... R5 2008 12 29 11 20 00 36.8000 -97.5000 374.00 314.00 60.00 266261 SGP 2008 12 11 19 21 00 1977-99 G co CCGG 135.610 -999.990 ... R5 2008 12 29 10 37 00 36.8000 -97.5000 374.00 314.00 60.00 266263 SGP 2008 12 11 19 21 00 1978-99 G co CCGG 135.450 -999.990 ... R5 2008 12 29 10 51 00 36.8000 -97.5000 374.00 314.00 60.00 266264 SGP 2008 12 19 19 35 00 3179-99 G co CCGG 158.890 -999.990 ... V2 2009 01 13 11 58 00 36.8000 -97.5000 374.00 314.00 60.00 267366 SGP 2008 12 19 19 35 00 3180-99 G co CCGG 158.760 -999.990 ... V2 2009 01 13 12 13 00 36.8000 -97.5000 374.00 314.00 60.00 267367 SGP 2008 12 26 19 53 00 2077-99 G co CCGG 113.290 -999.990 ... V2 2009 01 13 11 27 00 36.8000 -97.5000 374.00 314.00 60.00 267364 SGP 2008 12 26 19 53 00 2078-99 G co CCGG 112.950 -999.990 ... V2 2009 01 13 11 42 00 36.8000 -97.5000 374.00 314.00 60.00 267365 SGP 2009 01 02 20 03 00 1677-99 G co CCGG 212.780 -999.990 .X. V2 2009 01 21 13 03 00 36.8000 -97.5000 374.00 314.00 60.00 267886 SGP 2009 01 02 20 03 00 1678-99 G co CCGG 213.120 -999.990 .X. V2 2009 01 21 13 19 00 36.8000 -97.5000 374.00 314.00 60.00 267887 SGP 2009 01 08 20 19 00 295-99 G co CCGG 138.820 -999.990 ... V2 2009 01 21 12 33 00 36.8000 -97.5000 374.00 314.00 60.00 267884 SGP 2009 01 08 20 19 00 296-99 G co CCGG 138.860 -999.990 ... V2 2009 01 21 12 48 00 36.8000 -97.5000 374.00 314.00 60.00 267885 SGP 2009 01 15 20 28 00 2633-99 G co CCGG 144.770 -999.990 ... R5 2009 02 02 16 58 00 36.8000 -97.5000 374.00 314.00 60.00 268559 SGP 2009 01 15 20 28 00 2634-99 G co CCGG 145.390 -999.990 ... R5 2009 02 02 17 12 00 36.8000 -97.5000 374.00 314.00 60.00 268560 SGP 2009 01 22 20 09 00 37-99 G co CCGG 121.730 -999.990 ... R5 2009 02 02 16 29 00 36.8000 -97.5000 374.00 314.00 60.00 268557 SGP 2009 01 22 20 09 00 38-99 G co CCGG 121.750 -999.990 ... R5 2009 02 02 16 43 00 36.8000 -97.5000 374.00 314.00 60.00 268558 SGP 2009 01 29 20 55 00 3001-99 G co CCGG 132.780 -999.990 ... V2 2009 02 20 09 35 00 36.8000 -97.5000 374.00 314.00 60.00 269821 SGP 2009 01 29 20 55 00 3002-99 G co CCGG 131.920 -999.990 ... V2 2009 02 20 09 50 00 36.8000 -97.5000 374.00 314.00 60.00 269822 SGP 2009 02 05 20 35 00 727-99 G co CCGG 159.060 -999.990 ... V2 2009 02 20 11 07 00 36.8000 -97.5000 374.00 314.00 60.00 269819 SGP 2009 02 05 20 35 00 728-99 G co CCGG 158.890 -999.990 ... V2 2009 02 20 11 23 00 36.8000 -97.5000 374.00 314.00 60.00 269820 SGP 2009 02 12 20 31 00 2178-99 G co CCGG 141.780 -999.990 ... V2 2009 03 03 12 52 00 36.8000 -97.5000 374.00 314.00 60.00 270479 SGP 2009 02 12 20 31 00 2338-99 G co CCGG 141.550 -999.990 ... V2 2009 03 03 13 07 00 36.8000 -97.5000 374.00 314.00 60.00 270480 SGP 2009 02 19 19 10 00 3207-99 G co CCGG 145.130 -999.990 ... V2 2009 03 03 12 21 00 36.8000 -97.5000 374.00 314.00 60.00 270477 SGP 2009 02 19 19 10 00 3700-99 G co CCGG 144.850 -999.990 ... V2 2009 03 03 12 36 00 36.8000 -97.5000 374.00 314.00 60.00 270478 SGP 2009 02 26 21 16 00 4509-99 G co CCGG 192.270 -999.990 ... R5 2009 03 19 14 38 00 36.8000 -97.5000 374.00 314.00 60.00 271733 SGP 2009 02 26 21 16 00 6137-66 G co CCGG 191.940 -999.990 ... R5 2009 03 19 14 52 00 36.8000 -97.5000 374.00 314.00 60.00 271734 SGP 2009 03 05 20 35 00 3392-99 G co CCGG 148.260 -999.990 ... R5 2009 03 19 15 06 00 36.8000 -97.5000 374.00 314.00 60.00 271731 SGP 2009 03 05 20 35 00 4848-99 G co CCGG 148.000 -999.990 ... R5 2009 03 19 15 21 00 36.8000 -97.5000 374.00 314.00 60.00 271732 SGP 2009 03 12 20 29 00 3451-99 G co CCGG 159.900 -999.990 ... V2 2009 04 03 14 40 00 36.8000 -97.5000 374.00 314.00 60.00 272847 SGP 2009 03 12 20 29 00 3452-99 G co CCGG 159.180 -999.990 ... V2 2009 04 03 14 55 00 36.8000 -97.5000 374.00 314.00 60.00 272848 SGP 2009 03 19 19 30 00 1707-99 G co CCGG 190.920 -999.990 ... V2 2009 04 06 11 32 00 36.8000 -97.5000 374.00 314.00 60.00 272845 SGP 2009 03 19 19 30 00 1708-99 G co CCGG 191.810 -999.990 ... V2 2009 04 06 11 47 00 36.8000 -97.5000 374.00 314.00 60.00 272846 SGP 2009 03 26 19 05 00 2791-99 G co CCGG 207.990 -999.990 ... R5 2009 04 17 13 44 00 36.8000 -97.5000 374.00 314.00 60.00 273555 SGP 2009 03 26 19 05 00 2792-99 G co CCGG 207.860 -999.990 ... R5 2009 04 17 13 58 00 36.8000 -97.5000 374.00 314.00 60.00 273556 SGP 2009 04 02 19 48 00 2457-99 G co CCGG 154.270 -999.990 ... R5 2009 04 17 13 15 00 36.8000 -97.5000 374.00 314.00 60.00 273557 SGP 2009 04 02 19 48 00 2458-99 G co CCGG 153.920 -999.990 ... R5 2009 04 17 13 30 00 36.8000 -97.5000 374.00 314.00 60.00 273558 SGP 2009 04 09 19 31 00 4359-99 G co CCGG 132.790 -999.990 ... R5 2009 04 28 14 00 00 36.8000 -97.5000 374.00 314.00 60.00 274384 SGP 2009 04 09 19 31 00 4360-99 G co CCGG 132.640 -999.990 ... R5 2009 04 28 14 15 00 36.8000 -97.5000 374.00 314.00 60.00 274385 SGP 2009 04 16 20 08 00 4361-99 G co CCGG 157.540 -999.990 ... R5 2009 04 28 14 29 00 36.8000 -97.5000 374.00 314.00 60.00 274382 SGP 2009 04 16 20 08 00 4362-99 G co CCGG 156.750 -999.990 ... R5 2009 04 28 14 43 00 36.8000 -97.5000 374.00 314.00 60.00 274383 SGP 2009 04 23 20 02 00 4244-99 G co CCGG 149.400 -999.990 ... R5 2009 05 15 16 38 00 36.8000 -97.5000 374.00 314.00 60.00 275292 SGP 2009 04 23 20 02 00 970-99 G co CCGG 149.030 -999.990 ... R5 2009 05 15 16 24 00 36.8000 -97.5000 374.00 314.00 60.00 275293 SGP 2009 04 30 18 11 00 3037-99 G co CCGG 130.730 -999.990 ... V2 2009 05 16 10 43 00 36.8000 -97.5000 374.00 314.00 60.00 275290 SGP 2009 04 30 18 11 00 4781-99 G co CCGG 130.900 -999.990 ... V2 2009 05 16 10 58 00 36.8000 -97.5000 374.00 314.00 60.00 275291 SGP 2009 05 07 19 33 00 483-99 G co CCGG 216.050 -999.990 .X. V2 2009 06 15 11 28 00 36.8000 -97.5000 374.00 314.00 60.00 276259 SGP 2009 05 07 19 33 00 484-99 G co CCGG 216.230 -999.990 .X. V2 2009 06 15 11 44 00 36.8000 -97.5000 374.00 314.00 60.00 276260 SGP 2009 05 14 20 01 00 3877-99 G co CCGG 133.860 -999.990 ... V2 2009 06 05 13 27 00 36.8000 -97.5000 374.00 314.00 60.00 276261 SGP 2009 05 14 20 01 00 3878-99 G co CCGG 133.450 -999.990 ... V2 2009 06 05 13 42 00 36.8000 -97.5000 374.00 314.00 60.00 276262 SGP 2009 05 21 18 55 00 4587-99 G co CCGG 179.170 -999.990 ... V2 2009 06 23 10 45 00 36.8000 -97.5000 374.00 314.00 60.00 277020 SGP 2009 05 21 18 55 00 4588-99 G co CCGG 181.380 -999.990 ... V2 2009 06 23 11 01 00 36.8000 -97.5000 374.00 314.00 60.00 277021 SGP 2009 05 28 19 25 00 1059-99 G co CCGG 125.710 -999.990 ... V2 2009 06 23 10 14 00 36.8000 -97.5000 374.00 314.00 60.00 277018 SGP 2009 05 28 19 25 00 1060-99 G co CCGG 125.110 -999.990 ... V2 2009 06 23 10 30 00 36.8000 -97.5000 374.00 314.00 60.00 277019 SGP 2009 06 04 19 03 00 173-99 G co CCGG 135.980 -999.990 ... V2 2009 07 09 15 42 00 36.8000 -97.5000 374.00 314.00 60.00 278314 SGP 2009 06 04 19 03 00 174-99 G co CCGG 135.290 -999.990 ... V2 2009 07 09 15 58 00 36.8000 -97.5000 374.00 314.00 60.00 278315 SGP 2009 06 11 19 22 00 3271-99 G co CCGG 121.980 -999.990 ... V2 2009 07 09 16 13 00 36.8000 -97.5000 374.00 314.00 60.00 278312 SGP 2009 06 11 19 22 00 3272-99 G co CCGG 121.400 -999.990 ... V2 2009 07 09 16 29 00 36.8000 -97.5000 374.00 314.00 60.00 278313 SGP 2009 06 18 19 02 00 425-99 G co CCGG 113.310 -999.990 ... R5 2009 07 15 12 31 00 36.8000 -97.5000 374.00 314.00 60.00 278775 SGP 2009 06 18 19 02 00 426-99 G co CCGG 112.580 -999.990 ... R5 2009 07 15 12 45 00 36.8000 -97.5000 374.00 314.00 60.00 278776 SGP 2009 06 25 19 12 00 3129-99 G co CCGG 155.740 -999.990 ... R5 2009 07 15 12 02 00 36.8000 -97.5000 374.00 314.00 60.00 278773 SGP 2009 06 25 19 12 00 3130-99 G co CCGG 156.010 -999.990 ... R5 2009 07 15 12 16 00 36.8000 -97.5000 374.00 314.00 60.00 278774 SGP 2009 07 02 20 22 00 723-99 G co CCGG 153.520 -999.990 ... V2 2009 07 24 13 35 00 36.8000 -97.5000 374.00 314.00 60.00 279600 SGP 2009 07 02 20 22 00 724-99 G co CCGG 153.670 -999.990 ... V2 2009 07 24 13 51 00 36.8000 -97.5000 374.00 314.00 60.00 279601 SGP 2009 07 09 19 47 00 4999-99 G co CCGG 136.870 -999.990 ... V2 2009 07 24 14 06 00 36.8000 -97.5000 374.00 314.00 60.00 279602 SGP 2009 07 09 19 47 00 5000-99 G co CCGG 137.110 -999.990 ... V2 2009 07 24 14 21 00 36.8000 -97.5000 374.00 314.00 60.00 279603 SGP 2009 07 16 20 30 00 3043-99 G co CCGG 117.880 -999.990 ... R5 2009 08 05 13 58 00 36.8000 -97.5000 374.00 314.00 60.00 280658 SGP 2009 07 16 20 30 00 3153-99 G co CCGG 117.560 -999.990 ... R5 2009 08 05 14 12 00 36.8000 -97.5000 374.00 314.00 60.00 280659 SGP 2009 07 23 20 23 00 169-99 G co CCGG 127.800 -999.990 ... R5 2009 08 05 11 06 00 36.8000 -97.5000 374.00 314.00 60.00 280660 SGP 2009 07 23 20 23 00 3822-99 G co CCGG 127.940 -999.990 ... R5 2009 08 05 11 21 00 36.8000 -97.5000 374.00 314.00 60.00 280661 SGP 2009 07 29 20 20 00 2017-99 G co CCGG 119.110 -999.990 ... R5 2009 08 19 10 36 00 36.8000 -97.5000 374.00 314.00 60.00 281318 SGP 2009 07 29 20 20 00 2018-99 G co CCGG 119.000 -999.990 ... R5 2009 08 19 10 50 00 36.8000 -97.5000 374.00 314.00 60.00 281319 SGP 2009 08 06 20 17 00 481-99 G co CCGG 109.770 -999.990 ... R5 2009 08 18 17 34 00 36.8000 -97.5000 374.00 314.00 60.00 281320 SGP 2009 08 06 20 17 00 482-99 G co CCGG 109.660 -999.990 ... R5 2009 08 18 17 49 00 36.8000 -97.5000 374.00 314.00 60.00 281321 SGP 2009 08 13 19 00 00 2755-99 G co CCGG 154.200 -999.990 ... R5 2009 09 01 10 18 00 36.8000 -97.5000 374.00 314.00 60.00 282287 SGP 2009 08 13 19 00 00 2756-99 G co CCGG 155.140 -999.990 ... R5 2009 09 01 10 32 00 36.8000 -97.5000 374.00 314.00 60.00 282288 SGP 2009 08 20 20 01 00 4963-99 G co CCGG 100.100 -999.990 ... R5 2009 09 01 09 49 00 36.8000 -97.5000 374.00 314.00 60.00 282285 SGP 2009 08 20 20 01 00 4964-99 G co CCGG 98.820 -999.990 ... R5 2009 09 01 10 04 00 36.8000 -97.5000 374.00 314.00 60.00 282286 SGP 2009 08 27 19 17 00 3131-99 G co CCGG 120.030 -999.990 ... R5 2009 09 17 15 33 00 36.8000 -97.5000 374.00 314.00 60.00 283408 SGP 2009 08 27 19 17 00 3132-99 G co CCGG 118.370 -999.990 ... R5 2009 09 17 15 48 00 36.8000 -97.5000 374.00 314.00 60.00 283409 SGP 2009 09 03 19 09 00 3083-99 G co CCGG 159.970 -999.990 ... R5 2009 09 17 16 02 00 36.8000 -97.5000 374.00 314.00 60.00 283406 SGP 2009 09 03 19 09 00 3084-99 G co CCGG 159.840 -999.990 ... R5 2009 09 17 16 16 00 36.8000 -97.5000 374.00 314.00 60.00 283407 SGP 2009 09 10 19 32 00 2880-99 G co CCGG 149.530 -999.990 ... V2 2009 09 28 11 07 00 36.8000 -97.5000 374.00 314.00 60.00 284092 SGP 2009 09 10 19 32 00 4603-99 G co CCGG 149.310 -999.990 ... V2 2009 09 28 11 23 00 36.8000 -97.5000 374.00 314.00 60.00 284093 SGP 2009 09 18 18 32 00 2583-99 G co CCGG 126.350 -999.990 ... V2 2009 09 28 12 24 00 36.8000 -97.5000 374.00 314.00 60.00 284095 SGP 2009 09 18 18 32 00 2719-99 G co CCGG 126.010 -999.990 ... V2 2009 09 28 12 09 00 36.8000 -97.5000 374.00 314.00 60.00 284094 SGP 2009 09 24 19 45 00 1037-99 G co CCGG 106.150 -999.990 ... V2 2009 10 12 13 51 00 36.8000 -97.5000 374.00 314.00 60.00 284641 SGP 2009 09 24 19 45 00 3860-99 G co CCGG 106.140 -999.990 ... V2 2009 10 12 14 07 00 36.8000 -97.5000 374.00 314.00 60.00 284642 SGP 2009 10 01 20 31 00 881-99 G co CCGG 108.810 -999.990 ... V2 2009 10 13 10 56 00 36.8000 -97.5000 374.00 314.00 60.00 284639 SGP 2009 10 01 20 31 00 882-99 G co CCGG 108.370 -999.990 ... V2 2009 10 13 11 12 00 36.8000 -97.5000 374.00 314.00 60.00 284640 SGP 2009 10 09 19 10 00 2720-99 G co CCGG 102.990 -999.990 ... R5 2009 10 21 15 51 00 36.8000 -97.5000 374.00 314.00 60.00 285392 SGP 2009 10 09 19 10 00 2750-99 G co CCGG 102.550 -999.990 ... R5 2009 10 21 16 06 00 36.8000 -97.5000 374.00 314.00 60.00 285393 SGP 2009 10 15 18 49 00 3766-99 G co CCGG 140.550 -999.990 ... V2 2009 10 21 15 28 00 36.8000 -97.5000 374.00 314.00 60.00 285394 SGP 2009 10 15 18 49 00 832-99 G co CCGG 139.990 -999.990 ... V2 2009 10 21 15 44 00 36.8000 -97.5000 374.00 314.00 60.00 285395 SGP 2009 10 22 19 26 00 1359-99 G co CCGG 110.420 -999.990 ... V2 2009 11 18 12 30 00 36.8000 -97.5000 374.00 314.00 60.00 286034 SGP 2009 10 22 19 26 00 1360-99 G co CCGG 110.880 -999.990 ... V2 2009 11 18 12 46 00 36.8000 -97.5000 374.00 314.00 60.00 286035 SGP 2009 10 29 21 00 00 4035-99 G co CCGG 113.200 -999.990 ... V2 2009 11 18 13 01 00 36.8000 -97.5000 374.00 314.00 60.00 286032 SGP 2009 10 29 21 00 00 4036-99 G co CCGG 113.240 -999.990 ... V2 2009 11 18 13 16 00 36.8000 -97.5000 374.00 314.00 60.00 286033 SGP 2009 11 05 20 42 00 4055-99 G co CCGG 138.760 -999.990 ... V2 2009 12 04 11 05 00 36.8000 -97.5000 374.00 314.00 60.00 286866 SGP 2009 11 05 20 42 00 4056-99 G co CCGG 138.690 -999.990 ... V2 2009 12 04 11 21 00 36.8000 -97.5000 374.00 314.00 60.00 286867 SGP 2009 11 12 21 14 00 2037-99 G co CCGG 139.550 -999.990 ... V2 2009 12 03 17 53 00 36.8000 -97.5000 374.00 314.00 60.00 286864 SGP 2009 11 12 21 14 00 2038-99 G co CCGG 139.280 -999.990 ... V2 2009 12 03 18 08 00 36.8000 -97.5000 374.00 314.00 60.00 286865 SGP 2009 11 19 20 42 00 561-99 G co CCGG 163.690 -999.990 ... V2 2009 12 14 11 03 00 36.8000 -97.5000 374.00 314.00 60.00 287594 SGP 2009 11 19 20 42 00 562-99 G co CCGG 163.650 -999.990 ... V2 2009 12 14 11 19 00 36.8000 -97.5000 374.00 314.00 60.00 287595 SGP 2009 11 25 20 47 00 75-99 G co CCGG 112.830 -999.990 ... V2 2009 12 12 17 42 00 36.8000 -97.5000 374.00 314.00 60.00 287592 SGP 2009 11 25 20 47 00 76-99 G co CCGG 113.070 -999.990 ... V2 2009 12 12 17 58 00 36.8000 -97.5000 374.00 314.00 60.00 287593 SGP 2009 12 03 19 56 00 2669-99 G co CCGG 122.860 -999.990 ... V2 2010 01 12 14 15 00 36.8000 -97.5000 374.00 314.00 60.00 288334 SGP 2009 12 03 19 56 00 2670-99 G co CCGG 122.980 -999.990 ... V2 2010 01 12 14 30 00 36.8000 -97.5000 374.00 314.00 60.00 288335 SGP 2009 12 10 20 27 00 3879-99 G co CCGG 136.040 -999.990 ... V2 2010 01 12 15 47 00 36.8000 -97.5000 374.00 314.00 60.00 288332 SGP 2009 12 10 20 27 00 3880-99 G co CCGG 136.410 -999.990 ... V2 2010 01 12 16 02 00 36.8000 -97.5000 374.00 314.00 60.00 288333 SGP 2009 12 17 20 48 00 2873-99 G co CCGG 158.490 -999.990 ... V2 2010 01 27 10 00 00 36.8000 -97.5000 374.00 314.00 60.00 289101 SGP 2009 12 17 20 48 00 2874-99 G co CCGG 157.110 -999.990 ... V2 2010 01 27 10 15 00 36.8000 -97.5000 374.00 314.00 60.00 289102 SGP 2009 12 23 20 10 00 4505-99 G co CCGG 195.400 -999.990 ... V2 2010 01 27 10 30 00 36.8000 -97.5000 374.00 314.00 60.00 289099 SGP 2009 12 23 20 10 00 4506-99 G co CCGG 195.010 -999.990 ... V2 2010 01 27 10 46 00 36.8000 -97.5000 374.00 314.00 60.00 289100 SGP 2009 12 31 20 04 00 2466-99 G co CCGG 148.580 -999.990 ... V2 2010 02 10 13 03 00 36.8000 -97.5000 374.00 314.00 60.00 289655 SGP 2009 12 31 20 04 00 786-99 G co CCGG 149.640 -999.990 ... V2 2010 02 10 12 48 00 36.8000 -97.5000 374.00 314.00 60.00 289654 SGP 2010 01 07 23 11 00 35-99 G co CCGG 135.050 -999.990 ... V2 2010 02 10 13 19 00 36.8000 -97.5000 374.00 314.00 60.00 289656 SGP 2010 01 07 23 11 00 4230-99 G co CCGG 135.340 -999.990 ... V2 2010 02 10 13 35 00 36.8000 -97.5000 374.00 314.00 60.00 289657 SGP 2010 01 14 20 27 00 2544-99 G co CCGG 149.040 -999.990 ... V2 2010 02 19 13 42 00 36.8000 -97.5000 374.00 314.00 60.00 290241 SGP 2010 01 14 20 27 00 3385-99 G co CCGG 149.170 -999.990 ... V2 2010 02 19 13 57 00 36.8000 -97.5000 374.00 314.00 60.00 290242 SGP 2010 01 21 21 25 00 1842-99 G co CCGG 188.950 -999.990 ... V2 2010 02 19 13 27 00 36.8000 -97.5000 374.00 314.00 60.00 290240 SGP 2010 01 21 21 25 00 99-99 G co CCGG 189.710 -999.990 ... V2 2010 02 19 13 11 00 36.8000 -97.5000 374.00 314.00 60.00 290239 SGP 2010 02 05 20 14 00 2630-99 G co CCGG 187.960 -999.990 ... V2 2010 03 12 10 23 00 36.8000 -97.5000 374.00 314.00 60.00 291650 SGP 2010 02 05 20 14 00 2798-99 G co CCGG 186.160 -999.990 ... V2 2010 03 12 10 38 00 36.8000 -97.5000 374.00 314.00 60.00 291651 SGP 2010 02 11 20 03 00 3254-99 G co CCGG 185.630 -999.990 ... V2 2010 03 12 10 08 00 36.8000 -97.5000 374.00 314.00 60.00 291649 SGP 2010 02 11 20 03 00 3323-99 G co CCGG 185.780 -999.990 ... V2 2010 03 12 09 52 00 36.8000 -97.5000 374.00 314.00 60.00 291648 SGP 2010 02 18 20 27 00 5083-99 G co CCGG 160.220 -999.990 ... V2 2010 03 26 14 02 00 36.8000 -97.5000 374.00 314.00 60.00 292323 SGP 2010 02 18 20 27 00 5084-99 G co CCGG 158.710 -999.990 ... V2 2010 03 26 14 17 00 36.8000 -97.5000 374.00 314.00 60.00 292324 SGP 2010 02 25 21 12 00 3399-99 G co CCGG 148.000 -999.990 ... V2 2010 03 26 13 31 00 36.8000 -97.5000 374.00 314.00 60.00 292321 SGP 2010 02 25 21 12 00 3400-99 G co CCGG 148.150 -999.990 ... V2 2010 03 26 13 47 00 36.8000 -97.5000 374.00 314.00 60.00 292322 SGP 2010 03 03 21 28 00 5125-99 G co CCGG 160.580 -999.990 ... R5 2010 04 06 11 09 00 36.8000 -97.5000 374.00 314.00 60.00 293064 SGP 2010 03 03 21 28 00 5126-99 G co CCGG 160.460 -999.990 ... R5 2010 04 06 11 24 00 36.8000 -97.5000 374.00 314.00 60.00 293065 SGP 2010 03 12 20 07 00 5121-99 G co CCGG 165.590 -999.990 ... R5 2010 04 06 10 37 00 36.8000 -97.5000 374.00 314.00 60.00 293066 SGP 2010 03 12 20 07 00 5122-99 G co CCGG 165.330 -999.990 ... R5 2010 04 06 10 51 00 36.8000 -97.5000 374.00 314.00 60.00 293067 SGP 2010 03 18 19 37 00 3269-99 G co CCGG 157.580 -999.990 ... R5 2010 04 09 15 16 00 36.8000 -97.5000 374.00 314.00 60.00 293543 SGP 2010 03 18 19 37 00 3270-99 G co CCGG 159.040 -999.990 ... R5 2010 04 09 15 30 00 36.8000 -97.5000 374.00 314.00 60.00 293544 SGP 2010 03 25 20 03 00 3425-99 G co CCGG 159.470 -999.990 ... R5 2010 04 09 15 45 00 36.8000 -97.5000 374.00 314.00 60.00 293545 SGP 2010 03 25 20 03 00 3426-99 G co CCGG 158.700 -999.990 ... R5 2010 04 09 16 00 00 36.8000 -97.5000 374.00 314.00 60.00 293546 SGP 2010 04 01 19 20 00 1375-99 G co CCGG 170.800 -999.990 ... V2 2010 04 16 13 52 00 36.8000 -97.5000 374.00 314.00 60.00 294420 SGP 2010 04 01 19 20 00 1376-99 G co CCGG 171.180 -999.990 ... V2 2010 04 16 14 07 00 36.8000 -97.5000 374.00 314.00 60.00 294421 SGP 2010 04 08 18 51 00 581-99 G co CCGG 165.040 -999.990 ... V2 2010 04 16 13 22 00 36.8000 -97.5000 374.00 314.00 60.00 294418 SGP 2010 04 08 18 51 00 582-99 G co CCGG 164.590 -999.990 ... V2 2010 04 16 13 37 00 36.8000 -97.5000 374.00 314.00 60.00 294419 SGP 2010 04 15 20 10 00 2152-99 G co CCGG 145.100 -999.990 ... V2 2010 05 14 13 50 00 36.8000 -97.5000 374.00 314.00 60.00 295744 SGP 2010 04 15 20 10 00 2505-99 G co CCGG 145.910 -999.990 ... V2 2010 05 14 13 35 00 36.8000 -97.5000 374.00 314.00 60.00 295743 SGP 2010 04 22 19 34 00 1920-99 G co CCGG 167.580 -999.990 ... V2 2010 05 14 13 05 00 36.8000 -97.5000 374.00 314.00 60.00 295741 SGP 2010 04 22 19 34 00 2465-99 G co CCGG 169.390 -999.990 ... V2 2010 05 14 13 20 00 36.8000 -97.5000 374.00 314.00 60.00 295742 SGP 2010 04 29 19 46 00 239-99 G co CCGG 155.890 -999.990 ... R5 2010 05 24 16 43 00 36.8000 -97.5000 374.00 314.00 60.00 296521 SGP 2010 04 29 19 46 00 4958-99 G co CCGG 156.520 -999.990 ... R5 2010 05 24 16 58 00 36.8000 -97.5000 374.00 314.00 60.00 296522 SGP 2010 05 06 19 48 00 244-99 G co CCGG 200.920 -999.990 ... R5 2010 05 24 16 14 00 36.8000 -97.5000 374.00 314.00 60.00 296519 SGP 2010 05 06 19 48 00 2566-99 G co CCGG 200.670 -999.990 ... R5 2010 05 24 16 29 00 36.8000 -97.5000 374.00 314.00 60.00 296520 SGP 2010 05 13 21 10 00 4129-99 G co CCGG 149.730 -999.990 ... V2 2010 06 01 13 31 00 36.8000 -97.5000 374.00 314.00 60.00 297205 SGP 2010 05 13 21 10 00 4130-99 G co CCGG 150.430 -999.990 ... V2 2010 06 01 13 46 00 36.8000 -97.5000 374.00 314.00 60.00 297206 SGP 2010 05 20 19 47 00 4981-99 G co CCGG 150.090 -999.990 ... V2 2010 06 01 14 03 00 36.8000 -97.5000 374.00 314.00 60.00 297203 SGP 2010 05 20 19 47 00 4982-99 G co CCGG 150.190 -999.990 ... V2 2010 06 01 14 18 00 36.8000 -97.5000 374.00 314.00 60.00 297204 SGP 2010 05 27 19 15 00 971-99 G co CCGG 156.700 -999.990 ... R5 2010 06 11 10 33 00 36.8000 -97.5000 374.00 314.00 60.00 298264 SGP 2010 05 27 19 15 00 972-99 G co CCGG 157.840 -999.990 ... R5 2010 06 11 10 47 00 36.8000 -97.5000 374.00 314.00 60.00 298265 SGP 2010 06 03 19 29 00 2081-99 G co CCGG 144.430 -999.990 ... R5 2010 06 11 11 02 00 36.8000 -97.5000 374.00 314.00 60.00 298262 SGP 2010 06 03 19 29 00 2082-99 G co CCGG 144.450 -999.990 ... R5 2010 06 11 11 17 00 36.8000 -97.5000 374.00 314.00 60.00 298263 SGP 2010 06 11 20 12 00 6605-66 G co CCGG 125.930 -999.990 ... R5 2010 06 24 13 25 00 36.8000 -97.5000 374.00 314.00 60.00 298937 SGP 2010 06 11 20 12 00 6606-66 G co CCGG 126.600 -999.990 ... R5 2010 06 24 13 40 00 36.8000 -97.5000 374.00 314.00 60.00 298938 SGP 2010 06 17 20 25 00 5081-99 G co CCGG 94.560 -999.990 ... R5 2010 06 24 13 55 00 36.8000 -97.5000 374.00 314.00 60.00 298935 SGP 2010 06 17 20 25 00 5082-99 G co CCGG 94.290 -999.990 ... R5 2010 06 24 14 10 00 36.8000 -97.5000 374.00 314.00 60.00 298936 SGP 2010 06 24 21 40 00 1505-99 G co CCGG 138.570 -999.990 ... V2 2010 07 12 12 56 00 36.8000 -97.5000 374.00 314.00 60.00 299975 SGP 2010 06 24 21 40 00 1506-99 G co CCGG 138.200 -999.990 ... V2 2010 07 12 13 11 00 36.8000 -97.5000 374.00 314.00 60.00 299976 SGP 2010 07 01 20 37 00 857-99 G co CCGG 162.570 -999.990 ... V2 2010 07 12 12 25 00 36.8000 -97.5000 374.00 314.00 60.00 299973 SGP 2010 07 01 20 37 00 858-99 G co CCGG 162.280 -999.990 ... V2 2010 07 12 12 41 00 36.8000 -97.5000 374.00 314.00 60.00 299974 SGP 2010 07 09 18 33 00 1461-99 G co CCGG 120.100 -999.990 ... R5 2010 07 29 14 49 00 36.8000 -97.5000 374.00 314.00 60.00 300773 SGP 2010 07 09 18 33 00 1462-99 G co CCGG 119.710 -999.990 ... R5 2010 07 29 15 04 00 36.8000 -97.5000 374.00 314.00 60.00 300774 SGP 2010 07 15 19 55 00 3841-99 G co CCGG 115.030 -999.990 ... R5 2010 07 29 14 20 00 36.8000 -97.5000 374.00 314.00 60.00 300771 SGP 2010 07 15 19 55 00 3842-99 G co CCGG 114.620 -999.990 ... R5 2010 07 29 14 34 00 36.8000 -97.5000 374.00 314.00 60.00 300772 SGP 2010 07 23 20 01 00 2073-99 G co CCGG 100.030 -999.990 ... R5 2010 08 04 13 27 00 36.8000 -97.5000 374.00 314.00 60.00 301402 SGP 2010 07 23 20 01 00 2074-99 G co CCGG 99.980 -999.990 ... R5 2010 08 04 13 41 00 36.8000 -97.5000 374.00 314.00 60.00 301403 SGP 2010 07 29 19 36 00 4529-99 G co CCGG 95.150 -999.990 ... R5 2010 08 04 13 56 00 36.8000 -97.5000 374.00 314.00 60.00 301404 SGP 2010 07 29 19 36 00 4530-99 G co CCGG 95.610 -999.990 ... R5 2010 08 04 14 11 00 36.8000 -97.5000 374.00 314.00 60.00 301405 SGP 2010 08 06 17 45 00 2655-99 G co CCGG 134.750 -999.990 ... V2 2010 08 20 11 55 00 36.8000 -97.5000 374.00 314.00 60.00 302199 SGP 2010 08 06 17 45 00 2656-99 G co CCGG 136.230 -999.990 ... V2 2010 08 20 12 10 00 36.8000 -97.5000 374.00 314.00 60.00 302200 SGP 2010 08 12 20 02 00 711-99 G co CCGG 123.030 -999.990 ... V2 2010 08 20 11 25 00 36.8000 -97.5000 374.00 314.00 60.00 302197 SGP 2010 08 12 20 02 00 712-99 G co CCGG 123.470 -999.990 ... V2 2010 08 20 11 40 00 36.8000 -97.5000 374.00 314.00 60.00 302198 SGP 2010 08 19 19 01 00 3577-99 G co CCGG 159.060 -999.990 ... R5 2010 09 01 11 28 00 36.8000 -97.5000 374.00 314.00 60.00 303004 SGP 2010 08 19 19 01 00 3578-99 G co CCGG 157.850 -999.990 ... R5 2010 09 01 11 43 00 36.8000 -97.5000 374.00 314.00 60.00 303005 SGP 2010 08 26 19 44 00 2141-99 G co CCGG 175.620 -999.990 ... R5 2010 09 01 10 59 00 36.8000 -97.5000 374.00 314.00 60.00 303006 SGP 2010 08 26 19 44 00 2142-99 G co CCGG 175.930 -999.990 ... R5 2010 09 01 11 13 00 36.8000 -97.5000 374.00 314.00 60.00 303007 SGP 2010 09 02 20 01 00 911-99 G co CCGG 106.940 -999.990 ... V2 2010 09 21 12 36 00 36.8000 -97.5000 374.00 314.00 60.00 304231 SGP 2010 09 02 20 01 00 912-99 G co CCGG 106.480 -999.990 ... V2 2010 09 21 12 51 00 36.8000 -97.5000 374.00 314.00 60.00 304232 SGP 2010 09 10 18 51 00 2345-99 G co CCGG 117.670 -999.990 ... V2 2010 09 21 13 06 00 36.8000 -97.5000 374.00 314.00 60.00 304229 SGP 2010 09 10 18 51 00 2346-99 G co CCGG 117.490 -999.990 ... V2 2010 09 21 13 22 00 36.8000 -97.5000 374.00 314.00 60.00 304230 SGP 2010 09 16 19 26 00 3007-99 G co CCGG 114.970 -999.990 ... R5 2010 10 05 13 39 00 36.8000 -97.5000 374.00 314.00 60.00 304878 SGP 2010 09 16 19 26 00 3008-99 G co CCGG 114.710 -999.990 ... R5 2010 10 05 13 53 00 36.8000 -97.5000 374.00 314.00 60.00 304879 SGP 2010 09 23 20 01 00 2247-99 G co CCGG 100.130 -999.990 ... R5 2010 10 05 14 08 00 36.8000 -97.5000 374.00 314.00 60.00 304876 SGP 2010 09 23 20 01 00 2248-99 G co CCGG 100.520 -999.990 ... R5 2010 10 05 14 23 00 36.8000 -97.5000 374.00 314.00 60.00 304877 SGP 2010 09 30 19 57 00 2609-99 G co CCGG 112.670 -999.990 ... V2 2010 10 21 12 42 00 36.8000 -97.5000 374.00 314.00 60.00 305817 SGP 2010 09 30 19 57 00 2610-99 G co CCGG 111.630 -999.990 ... V2 2010 10 21 12 57 00 36.8000 -97.5000 374.00 314.00 60.00 305818 SGP 2010 10 07 20 16 00 5105-99 G co CCGG 137.630 -999.990 ... V2 2010 10 21 13 12 00 36.8000 -97.5000 374.00 314.00 60.00 305815 SGP 2010 10 07 20 16 00 5106-99 G co CCGG 137.370 -999.990 ... V2 2010 10 21 13 27 00 36.8000 -97.5000 374.00 314.00 60.00 305816 SGP 2010 10 14 19 29 00 2175-99 G co CCGG 124.790 -999.990 ... R5 2010 11 02 11 39 00 36.8000 -97.5000 374.00 314.00 60.00 306775 SGP 2010 10 14 19 29 00 254-99 G co CCGG 124.790 -999.990 ... R5 2010 11 02 11 25 00 36.8000 -97.5000 374.00 314.00 60.00 306774 SGP 2010 10 21 20 46 00 1476-99 G co CCGG 148.440 -999.990 ... R5 2010 11 02 11 54 00 36.8000 -97.5000 374.00 314.00 60.00 306776 SGP 2010 10 21 20 46 00 2384-99 G co CCGG 148.500 -999.990 ... R5 2010 11 02 12 09 00 36.8000 -97.5000 374.00 314.00 60.00 306777 SGP 2010 10 28 19 56 00 1657-99 G co CCGG 122.920 -999.990 ..> R5 2010 11 10 12 53 00 36.8000 -97.5000 374.00 314.00 60.00 307303 SGP 2010 10 28 19 56 00 1658-99 G co CCGG 123.240 -999.990 ... R5 2010 11 10 13 07 00 36.8000 -97.5000 374.00 314.00 60.00 307304 SGP 2010 11 04 20 15 00 241-99 G co CCGG 115.700 -999.990 ... R5 2010 11 09 15 59 00 36.8000 -97.5000 374.00 314.00 60.00 307301 SGP 2010 11 04 20 15 00 242-99 G co CCGG 115.730 -999.990 ... R5 2010 11 09 16 14 00 36.8000 -97.5000 374.00 314.00 60.00 307302 SGP 2010 11 12 19 28 00 3553-99 G co CCGG 124.200 -999.990 ... R5 2010 12 01 13 50 00 36.8000 -97.5000 374.00 314.00 60.00 308323 SGP 2010 11 12 19 28 00 3554-99 G co CCGG 124.320 -999.990 ... R5 2010 12 01 14 04 00 36.8000 -97.5000 374.00 314.00 60.00 308324 SGP 2010 11 18 19 38 00 4057-99 G co CCGG 136.490 -999.990 ... R5 2010 12 01 13 20 00 36.8000 -97.5000 374.00 314.00 60.00 308321 SGP 2010 11 18 19 38 00 4058-99 G co CCGG 136.630 -999.990 ... R5 2010 12 01 13 35 00 36.8000 -97.5000 374.00 314.00 60.00 308322 SGP 2010 11 26 18 58 00 3937-99 G co CCGG 130.330 -999.990 ... V2 2010 12 15 16 14 00 36.8000 -97.5000 374.00 314.00 60.00 309167 SGP 2010 11 26 18 58 00 3938-99 G co CCGG 130.290 -999.990 ... V2 2010 12 15 16 31 00 36.8000 -97.5000 374.00 314.00 60.00 309168 SGP 2010 12 02 20 00 00 3889-99 G co CCGG 142.620 -999.990 ... V2 2010 12 15 15 42 00 36.8000 -97.5000 374.00 314.00 60.00 309165 SGP 2010 12 02 20 00 00 3890-99 G co CCGG 142.580 -999.990 ... V2 2010 12 15 15 58 00 36.8000 -97.5000 374.00 314.00 60.00 309166 SGP 2010 12 09 18 37 00 4509-99 G co CCGG 148.610 -999.990 ... R5 2010 12 28 11 03 00 36.8000 -97.5000 374.00 314.00 60.00 309931 SGP 2010 12 09 18 37 00 4905-99 G co CCGG 148.300 -999.990 ... R5 2010 12 28 10 48 00 36.8000 -97.5000 374.00 314.00 60.00 309932 SGP 2010 12 16 20 53 00 228-99 G co CCGG 129.220 -999.990 ... R5 2010 12 28 10 19 00 36.8000 -97.5000 374.00 314.00 60.00 309933 SGP 2010 12 16 20 53 00 3853-99 G co CCGG 128.630 -999.990 ... R5 2010 12 28 10 33 00 36.8000 -97.5000 374.00 314.00 60.00 309934 SGP 2010 12 23 19 17 00 5145-99 G co CCGG 197.690 -999.990 ... R5 2011 01 07 10 58 00 36.8000 -97.5000 374.00 314.00 60.00 310374 SGP 2010 12 23 19 17 00 5146-99 G co CCGG 198.190 -999.990 ... R5 2011 01 07 11 13 00 36.8000 -97.5000 374.00 314.00 60.00 310375 SGP 2010 12 29 21 11 00 1473-99 G co CCGG 184.370 -999.990 ... R5 2011 01 07 10 29 00 36.8000 -97.5000 374.00 314.00 60.00 310372 SGP 2010 12 29 21 11 00 1474-99 G co CCGG 184.780 -999.990 ... R5 2011 01 07 10 44 00 36.8000 -97.5000 374.00 314.00 60.00 310373 SGP 2011 01 06 19 31 00 3393-99 G co CCGG 134.080 -999.990 ... V2 2011 01 21 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 311508 SGP 2011 01 06 19 31 00 3394-99 G co CCGG 133.930 -999.990 ... V2 2011 01 21 12 22 00 36.8000 -97.5000 374.00 314.00 60.00 311509 SGP 2011 01 14 21 00 00 5051-99 G co CCGG 218.510 -999.990 .X. V2 2011 01 21 13 10 00 36.8000 -97.5000 374.00 314.00 60.00 311506 SGP 2011 01 14 21 00 00 5052-99 G co CCGG 217.580 -999.990 .X. V2 2011 01 21 13 27 00 36.8000 -97.5000 374.00 314.00 60.00 311507 SGP 2011 01 20 20 30 00 4635-99 G co CCGG 134.970 -999.990 ... V2 2011 02 08 12 11 00 36.8000 -97.5000 374.00 314.00 60.00 312104 SGP 2011 01 20 20 30 00 589-99 G co CCGG 135.380 -999.990 ... V2 2011 02 08 11 55 00 36.8000 -97.5000 374.00 314.00 60.00 312105 SGP 2011 01 27 20 37 00 2182-99 G co CCGG 116.850 -999.990 ... V2 2011 02 08 12 27 00 36.8000 -97.5000 374.00 314.00 60.00 312102 SGP 2011 01 27 20 37 00 3968-99 G co CCGG 117.110 -999.990 ... V2 2011 02 08 12 43 00 36.8000 -97.5000 374.00 314.00 60.00 312103 SGP 2011 02 04 16 40 00 3694-99 G co CCGG 192.380 -999.990 ... V4 2011 02 24 15 21 00 36.8000 -97.5000 374.00 314.00 60.00 313116 SGP 2011 02 04 16 40 00 4101-99 G co CCGG 191.990 -999.990 ... V4 2011 02 24 15 06 00 36.8000 -97.5000 374.00 314.00 60.00 313115 SGP 2011 02 10 19 31 00 1727-99 G co CCGG 155.020 -999.990 ... V2 2011 02 24 14 03 00 36.8000 -97.5000 374.00 314.00 60.00 313117 SGP 2011 02 10 19 31 00 3621-99 G co CCGG 154.920 -999.990 ... V2 2011 02 24 14 19 00 36.8000 -97.5000 374.00 314.00 60.00 313118 SGP 2011 02 17 21 02 00 4860-99 G co CCGG 147.870 -999.990 ... V2 2011 03 07 16 38 00 36.8000 -97.5000 374.00 314.00 60.00 313740 SGP 2011 02 17 21 02 00 4971-99 G co CCGG 146.880 -999.990 ... V2 2011 03 07 16 22 00 36.8000 -97.5000 374.00 314.00 60.00 313739 SGP 2011 02 24 21 24 00 2531-99 G co CCGG 195.360 -999.990 ... V2 2011 03 07 15 49 00 36.8000 -97.5000 374.00 314.00 60.00 313737 SGP 2011 02 24 21 24 00 3257-99 G co CCGG 194.210 -999.990 ... V2 2011 03 07 16 06 00 36.8000 -97.5000 374.00 314.00 60.00 313738 SGP 2011 03 03 23 33 00 1336-99 G co CCGG 192.570 -999.990 ... V4 2011 03 17 16 24 00 36.8000 -97.5000 374.00 314.00 60.00 314325 SGP 2011 03 03 23 33 00 4180-99 G co CCGG 192.990 -999.990 ... V4 2011 03 17 16 39 00 36.8000 -97.5000 374.00 314.00 60.00 314326 SGP 2011 03 10 19 58 00 1127-99 G co CCGG 156.810 -999.990 ... V4 2011 03 17 15 54 00 36.8000 -97.5000 374.00 314.00 60.00 314327 SGP 2011 03 10 19 58 00 5131-99 G co CCGG 156.270 -999.990 ... V4 2011 03 17 16 09 00 36.8000 -97.5000 374.00 314.00 60.00 314328 SGP 2011 03 16 19 02 00 3393-99 G co CCGG 193.630 -999.990 T.. V4 2011 03 22 15 16 00 36.8000 -97.5000 374.00 314.00 60.00 314794 SGP 2011 03 16 19 02 00 3394-99 G co CCGG 193.540 -999.990 T.. V4 2011 03 22 15 31 00 36.8000 -97.5000 374.00 314.00 60.00 314795 SGP 2011 03 16 19 13 00 5425-99 G co CCGG 188.050 -999.990 T.. V4 2011 03 22 15 46 00 36.8000 -97.5000 374.00 314.00 60.00 314792 SGP 2011 03 16 19 13 00 5426-99 G co CCGG 190.430 -999.990 T.. V4 2011 03 22 16 01 00 36.8000 -97.5000 374.00 314.00 60.00 314793 SGP 2011 03 16 20 00 00 1043-99 G co CCGG 183.420 -999.990 T.. V4 2011 03 22 17 02 00 36.8000 -97.5000 374.00 314.00 60.00 314799 SGP 2011 03 16 20 00 00 875-99 G co CCGG 183.420 -999.990 T.. V4 2011 03 22 16 47 00 36.8000 -97.5000 374.00 314.00 60.00 314798 SGP 2011 03 16 20 20 00 3460-99 G co CCGG 183.190 -999.990 T.. V4 2011 03 22 16 32 00 36.8000 -97.5000 374.00 314.00 60.00 314797 SGP 2011 03 16 20 20 00 431-99 G co CCGG 182.850 -999.990 T.. V4 2011 03 22 16 17 00 36.8000 -97.5000 374.00 314.00 60.00 314796 SGP 2011 03 24 19 25 00 2959-99 G co CCGG 158.450 -999.990 T.. V2 2011 04 07 11 31 00 36.8000 -97.5000 374.00 314.00 60.00 315488 SGP 2011 03 24 19 25 00 4101-99 G co CCGG 158.480 -999.990 ... V2 2011 04 07 11 47 00 36.8000 -97.5000 374.00 314.00 60.00 315489 SGP 2011 03 31 17 55 00 1630-99 G co CCGG 160.930 -999.990 ... V2 2011 04 07 12 04 00 36.8000 -97.5000 374.00 314.00 60.00 315486 SGP 2011 03 31 17 55 00 1860-99 G co CCGG 161.440 -999.990 ... V2 2011 04 07 12 20 00 36.8000 -97.5000 374.00 314.00 60.00 315487 SGP 2011 04 07 20 48 00 4675-99 G co CCGG 219.480 -999.990 ... V2 2011 04 25 14 40 00 36.8000 -97.5000 374.00 314.00 60.00 316304 SGP 2011 04 07 20 48 00 4676-99 G co CCGG 219.500 -999.990 ... V2 2011 04 25 14 57 00 36.8000 -97.5000 374.00 314.00 60.00 316305 SGP 2011 04 14 12 34 56 3947-99 G co CCGG 162.650 -999.990 ... V2 2011 04 25 15 45 00 36.8000 -97.5000 374.00 314.00 60.00 316302 SGP 2011 04 14 12 34 56 3948-99 G co CCGG 161.900 -999.990 ... V2 2011 04 25 16 02 00 36.8000 -97.5000 374.00 314.00 60.00 316303 SGP 2011 04 21 20 14 00 265-99 G co CCGG 175.680 -999.990 ... V4 2011 05 05 13 12 00 36.8000 -97.5000 374.00 314.00 60.00 317127 SGP 2011 04 21 20 14 00 333-99 G co CCGG 175.370 -999.990 ... V4 2011 05 05 13 27 00 36.8000 -97.5000 374.00 314.00 60.00 317126 SGP 2011 04 28 18 22 00 2265-99 G co CCGG 146.020 -999.990 ... V4 2011 05 05 12 57 00 36.8000 -97.5000 374.00 314.00 60.00 317125 SGP 2011 04 28 18 22 00 2654-99 G co CCGG 145.040 -999.990 ... V4 2011 05 05 12 42 00 36.8000 -97.5000 374.00 314.00 60.00 317124 SGP 2011 05 05 20 09 00 4385-99 G co CCGG 129.790 -999.990 ... V4 2011 05 20 11 01 00 36.8000 -97.5000 374.00 314.00 60.00 317839 SGP 2011 05 05 20 09 00 4386-99 G co CCGG 130.210 -999.990 ... V4 2011 05 20 11 16 00 36.8000 -97.5000 374.00 314.00 60.00 317840 SGP 2011 05 13 19 31 00 2137-99 G co CCGG 131.220 -999.990 ... V4 2011 05 20 11 31 00 36.8000 -97.5000 374.00 314.00 60.00 317837 SGP 2011 05 13 19 31 00 2138-99 G co CCGG 131.330 -999.990 ... V4 2011 05 20 11 47 00 36.8000 -97.5000 374.00 314.00 60.00 317838 SGP 2011 05 19 20 00 00 5389-99 G co CCGG 161.060 -999.990 ... V4 2011 06 03 15 09 00 36.8000 -97.5000 374.00 314.00 60.00 318514 SGP 2011 05 19 20 00 00 5390-99 G co CCGG 160.840 -999.990 ... V4 2011 06 03 15 25 00 36.8000 -97.5000 374.00 314.00 60.00 318515 SGP 2011 05 26 18 13 00 5403-99 G co CCGG 126.380 -999.990 ... V4 2011 06 03 14 39 00 36.8000 -97.5000 374.00 314.00 60.00 318516 SGP 2011 05 26 18 13 00 5404-99 G co CCGG 126.650 -999.990 ... V4 2011 06 03 14 54 00 36.8000 -97.5000 374.00 314.00 60.00 318517 SGP 2011 06 02 19 53 00 1740-99 G co CCGG 148.960 -999.990 ... V4 2011 06 15 13 57 00 36.8000 -97.5000 374.00 314.00 60.00 319150 SGP 2011 06 02 19 53 00 3207-99 G co CCGG 149.560 -999.990 ... V4 2011 06 15 14 12 00 36.8000 -97.5000 374.00 314.00 60.00 319151 SGP 2011 06 09 18 18 00 2465-99 G co CCGG 148.950 -999.990 ... V4 2011 06 15 13 26 00 36.8000 -97.5000 374.00 314.00 60.00 319152 SGP 2011 06 09 18 18 00 4905-99 G co CCGG 149.700 -999.990 ... V4 2011 06 15 13 41 00 36.8000 -97.5000 374.00 314.00 60.00 319153 SGP 2011 06 16 20 36 00 2921-99 G co CCGG 127.720 -999.990 ... V4 2011 06 30 10 44 00 36.8000 -97.5000 374.00 314.00 60.00 319886 SGP 2011 06 16 20 36 00 4762-99 G co CCGG 126.860 -999.990 ... V4 2011 06 30 10 59 00 36.8000 -97.5000 374.00 314.00 60.00 319887 SGP 2011 06 23 18 53 00 4202-99 G co CCGG 148.960 -999.990 ... V4 2011 06 30 11 14 00 36.8000 -97.5000 374.00 314.00 60.00 319888 SGP 2011 06 23 18 53 00 4746-99 G co CCGG 146.850 -999.990 ... V4 2011 06 30 11 30 00 36.8000 -97.5000 374.00 314.00 60.00 319889 SGP 2011 06 30 20 32 00 2397-99 G co CCGG 122.770 -999.990 ... V4 2011 07 19 12 57 00 36.8000 -97.5000 374.00 314.00 60.00 320472 SGP 2011 06 30 20 32 00 2398-99 G co CCGG 121.500 -999.990 ... V4 2011 07 19 13 12 00 36.8000 -97.5000 374.00 314.00 60.00 320473 SGP 2011 07 07 19 06 00 4583-99 G co CCGG 167.920 -999.990 ... V4 2011 07 19 13 27 00 36.8000 -97.5000 374.00 314.00 60.00 320470 SGP 2011 07 07 19 06 00 4584-99 G co CCGG 167.990 -999.990 ... V4 2011 07 19 13 43 00 36.8000 -97.5000 374.00 314.00 60.00 320471 SGP 2011 07 14 20 30 00 559-99 G co CCGG 118.780 -999.990 ... V4 2011 08 03 13 41 00 36.8000 -97.5000 374.00 314.00 60.00 321572 SGP 2011 07 14 20 30 00 560-99 G co CCGG 118.720 -999.990 ... V4 2011 08 03 13 56 00 36.8000 -97.5000 374.00 314.00 60.00 321573 SGP 2011 07 21 19 28 00 5389-99 G co CCGG 158.650 -999.990 ... V4 2011 08 03 13 11 00 36.8000 -97.5000 374.00 314.00 60.00 321574 SGP 2011 07 21 19 28 00 5390-99 G co CCGG 157.600 -999.990 ... V4 2011 08 03 13 26 00 36.8000 -97.5000 374.00 314.00 60.00 321575 SGP 2011 07 27 20 26 00 2465-99 G co CCGG 127.310 -999.990 ... V2 2011 08 16 14 35 00 36.8000 -97.5000 374.00 314.00 60.00 322099 SGP 2011 07 27 20 26 00 391-99 G co CCGG 126.710 -999.990 ... V2 2011 08 16 14 19 00 36.8000 -97.5000 374.00 314.00 60.00 322098 SGP 2011 08 04 18 43 00 2602-99 G co CCGG 134.120 -999.990 ... V2 2011 08 16 13 46 00 36.8000 -97.5000 374.00 314.00 60.00 322094 SGP 2011 08 04 18 43 00 3344-99 G co CCGG 133.280 -999.990 ... V2 2011 08 16 14 02 00 36.8000 -97.5000 374.00 314.00 60.00 322095 SGP 2011 08 11 19 37 00 1778-99 G co CCGG 109.040 -999.990 ... V2 2011 08 25 13 51 00 36.8000 -97.5000 374.00 314.00 60.00 322664 SGP 2011 08 11 19 37 00 3051-99 G co CCGG 108.840 -999.990 ... V2 2011 08 25 14 07 00 36.8000 -97.5000 374.00 314.00 60.00 322663 SGP 2011 08 18 18 33 00 1835-99 G co CCGG 120.830 -999.990 ... V2 2011 08 25 13 35 00 36.8000 -97.5000 374.00 314.00 60.00 322665 SGP 2011 08 18 18 33 00 4130-99 G co CCGG 121.600 -999.990 ... V2 2011 08 25 14 24 00 36.8000 -97.5000 374.00 314.00 60.00 322666 SGP 2011 08 25 20 12 00 4825-99 G co CCGG 109.880 -999.990 ... V4 2011 09 15 11 10 00 36.8000 -97.5000 374.00 314.00 60.00 323489 SGP 2011 08 25 20 12 00 4826-99 G co CCGG 110.210 -999.990 ... V4 2011 09 15 11 25 00 36.8000 -97.5000 374.00 314.00 60.00 323490 SGP 2011 09 01 19 10 00 5109-99 G co CCGG 147.340 -999.990 ... V4 2011 09 15 11 40 00 36.8000 -97.5000 374.00 314.00 60.00 323487 SGP 2011 09 01 19 10 00 5110-99 G co CCGG 148.500 -999.990 ... V4 2011 09 15 11 55 00 36.8000 -97.5000 374.00 314.00 60.00 323488 SGP 2011 09 08 19 18 00 1699-99 G co CCGG 111.160 -999.990 ... V4 2011 09 23 16 34 00 36.8000 -97.5000 374.00 314.00 60.00 324134 SGP 2011 09 08 19 18 00 846-99 G co CCGG 111.530 -999.990 ... V4 2011 09 23 16 19 00 36.8000 -97.5000 374.00 314.00 60.00 324133 SGP 2011 09 15 19 03 00 317-99 G co CCGG 93.720 -999.990 ... V4 2011 09 26 11 34 00 36.8000 -97.5000 374.00 314.00 60.00 324132 SGP 2011 09 15 19 03 00 35-99 G co CCGG 93.340 -999.990 ... V4 2011 09 26 11 19 00 36.8000 -97.5000 374.00 314.00 60.00 324131 SGP 2011 09 22 22 04 00 2845-99 G co CCGG 103.460 -999.990 ... V4 2011 10 06 13 39 00 36.8000 -97.5000 374.00 314.00 60.00 324670 SGP 2011 09 22 22 04 00 5060-99 G co CCGG 103.120 -999.990 ... V4 2011 10 06 13 54 00 36.8000 -97.5000 374.00 314.00 60.00 324671 SGP 2011 09 29 18 20 00 2606-99 G co CCGG 110.720 -999.990 ... V4 2011 10 06 14 09 00 36.8000 -97.5000 374.00 314.00 60.00 324672 SGP 2011 09 29 18 20 00 4830-99 G co CCGG 110.680 -999.990 ... V4 2011 10 06 14 24 00 36.8000 -97.5000 374.00 314.00 60.00 324673 SGP 2011 10 06 20 07 00 1274-99 G co CCGG 112.440 -999.990 ... V2 2011 11 01 16 13 00 36.8000 -97.5000 374.00 314.00 60.00 325567 SGP 2011 10 06 20 07 00 4143-99 G co CCGG 112.360 -999.990 ... V2 2011 11 01 16 29 00 36.8000 -97.5000 374.00 314.00 60.00 325568 SGP 2011 10 13 20 09 00 3228-99 G co CCGG 106.700 -999.990 ... V2 2011 11 01 16 45 00 36.8000 -97.5000 374.00 314.00 60.00 325569 SGP 2011 10 13 20 09 00 4237-99 G co CCGG 104.470 -999.990 ... V2 2011 11 01 17 01 00 36.8000 -97.5000 374.00 314.00 60.00 325570 SGP 2011 10 20 19 10 00 1037-99 G co CCGG 123.970 -999.990 ... V4 2011 11 09 14 19 00 36.8000 -97.5000 374.00 314.00 60.00 326317 SGP 2011 10 20 19 10 00 1218-99 G co CCGG 125.230 -999.990 ... V4 2011 11 09 14 34 00 36.8000 -97.5000 374.00 314.00 60.00 326318 SGP 2011 10 27 19 29 00 2339-99 G co CCGG 130.060 -999.990 ... V4 2011 11 09 15 05 00 36.8000 -97.5000 374.00 314.00 60.00 326320 SGP 2011 10 27 19 29 00 606-99 G co CCGG 129.920 -999.990 ... V4 2011 11 09 14 49 00 36.8000 -97.5000 374.00 314.00 60.00 326319 SGP 2011 11 04 01 49 00 4113-99 G co CCGG 122.510 -999.990 ... V4 2011 11 30 15 55 00 36.8000 -97.5000 374.00 314.00 60.00 327082 SGP 2011 11 04 01 49 00 4114-99 G co CCGG 122.210 -999.990 ... V4 2011 11 30 16 10 00 36.8000 -97.5000 374.00 314.00 60.00 327083 SGP 2011 11 10 19 58 00 727-99 G co CCGG 132.260 -999.990 ... V4 2011 11 30 16 25 00 36.8000 -97.5000 374.00 314.00 60.00 327080 SGP 2011 11 10 19 58 00 728-99 G co CCGG 131.500 -999.990 ... V4 2011 11 30 16 40 00 36.8000 -97.5000 374.00 314.00 60.00 327081 SGP 2011 11 17 20 07 00 879-99 G co CCGG 118.370 -999.990 ... V2 2011 12 14 14 48 00 36.8000 -97.5000 374.00 314.00 60.00 327740 SGP 2011 11 17 20 07 00 880-99 G co CCGG 119.990 -999.990 ... V2 2011 12 14 15 04 00 36.8000 -97.5000 374.00 314.00 60.00 327741 SGP 2011 11 23 20 41 00 81-99 G co CCGG 122.300 -999.990 ... V2 2011 12 14 15 20 00 36.8000 -97.5000 374.00 314.00 60.00 327742 SGP 2011 11 23 20 41 00 82-99 G co CCGG 122.680 -999.990 ... V2 2011 12 14 15 37 00 36.8000 -97.5000 374.00 314.00 60.00 327743 SGP 2011 12 01 19 48 00 4634-99 G co CCGG 178.240 -999.990 ... V2 2012 01 13 12 02 00 36.8000 -97.5000 374.00 314.00 60.00 329062 SGP 2011 12 01 19 48 00 5144-99 G co CCGG 177.440 -999.990 ... V2 2012 01 13 12 18 00 36.8000 -97.5000 374.00 314.00 60.00 329063 SGP 2011 12 08 15 15 00 1247-99 G co CCGG 178.600 -999.990 ... V2 2012 01 13 11 30 00 36.8000 -97.5000 374.00 314.00 60.00 329060 SGP 2011 12 08 15 15 00 1325-99 G co CCGG 177.360 -999.990 ... V2 2012 01 13 11 46 00 36.8000 -97.5000 374.00 314.00 60.00 329061 SGP 2011 12 15 21 04 00 1415-99 G co CCGG 120.010 -999.990 ... V4 2012 01 05 15 18 00 36.8000 -97.5000 374.00 314.00 60.00 328739 SGP 2011 12 15 21 04 00 1416-99 G co CCGG 119.650 -999.990 ... V4 2012 01 05 15 34 00 36.8000 -97.5000 374.00 314.00 60.00 328740 SGP 2011 12 22 19 40 00 3375-99 G co CCGG 140.760 -999.990 ... V2 2012 01 05 16 27 00 36.8000 -97.5000 374.00 314.00 60.00 328737 SGP 2011 12 22 19 40 00 3376-99 G co CCGG 141.680 -999.990 ... V2 2012 01 05 16 43 00 36.8000 -97.5000 374.00 314.00 60.00 328738 SGP 2011 12 29 21 06 00 1300-99 G co CCGG 142.510 -999.990 ... V4 2012 01 19 11 42 00 36.8000 -97.5000 374.00 314.00 60.00 329512 SGP 2011 12 29 21 06 00 3747-99 G co CCGG 142.230 -999.990 ... V4 2012 01 19 11 57 00 36.8000 -97.5000 374.00 314.00 60.00 329513 SGP 2012 01 05 20 14 00 154-99 G co CCGG 115.970 -999.990 ... V4 2012 01 19 12 29 00 36.8000 -97.5000 374.00 314.00 60.00 329511 SGP 2012 01 05 20 14 00 84-99 G co CCGG 115.470 -999.990 ... V4 2012 01 19 12 14 00 36.8000 -97.5000 374.00 314.00 60.00 329510 SGP 2012 01 12 20 30 00 2800-99 G co CCGG 122.130 -999.990 ... V2 2012 02 01 12 05 00 36.8000 -97.5000 374.00 314.00 60.00 330374 SGP 2012 01 12 20 30 00 4005-99 G co CCGG 122.890 -999.990 ... V2 2012 02 01 12 21 00 36.8000 -97.5000 374.00 314.00 60.00 330375 SGP 2012 01 19 20 16 00 606-99 G co CCGG 167.680 -999.990 ... V2 2012 02 01 11 33 00 36.8000 -97.5000 374.00 314.00 60.00 330372 SGP 2012 01 19 20 16 00 689-99 G co CCGG 166.500 -999.990 ... V2 2012 02 01 11 49 00 36.8000 -97.5000 374.00 314.00 60.00 330373 SGP 2012 01 26 20 19 00 4863-99 G co CCGG 123.240 -999.990 ... V4 2012 02 13 12 15 00 36.8000 -97.5000 374.00 314.00 60.00 331130 SGP 2012 01 26 20 19 00 4864-99 G co CCGG 122.700 -999.990 ... V4 2012 02 13 12 31 00 36.8000 -97.5000 374.00 314.00 60.00 331131 SGP 2012 02 02 21 30 00 2639-99 G co CCGG 160.340 -999.990 ... V2 2012 02 13 11 19 00 36.8000 -97.5000 374.00 314.00 60.00 331132 SGP 2012 02 02 21 30 00 2640-99 G co CCGG 160.620 -999.990 ... V2 2012 02 13 11 35 00 36.8000 -97.5000 374.00 314.00 60.00 331133 SGP 2012 02 09 20 25 00 1268-99 G co CCGG 164.310 -999.990 ... V4 2012 03 01 12 36 00 36.8000 -97.5000 374.00 314.00 60.00 331875 SGP 2012 02 09 20 25 00 4566-99 G co CCGG 164.240 -999.990 ... V4 2012 03 01 12 51 00 36.8000 -97.5000 374.00 314.00 60.00 331876 SGP 2012 02 16 19 52 00 1190-99 G co CCGG 154.110 -999.990 ... V4 2012 03 01 14 38 00 36.8000 -97.5000 374.00 314.00 60.00 331877 SGP 2012 02 16 19 52 00 5378-99 G co CCGG 154.070 -999.990 ... V4 2012 03 01 14 53 00 36.8000 -97.5000 374.00 314.00 60.00 331878 SGP 2012 02 23 20 26 00 2105-99 G co CCGG 117.310 -999.990 ... V4 2012 03 14 13 53 00 36.8000 -97.5000 374.00 314.00 60.00 332644 SGP 2012 02 23 20 26 00 2106-99 G co CCGG 117.560 -999.990 ... V4 2012 03 14 14 09 00 36.8000 -97.5000 374.00 314.00 60.00 332645 SGP 2012 03 01 21 18 00 2193-99 G co CCGG 152.810 -999.990 ... V4 2012 03 14 13 21 00 36.8000 -97.5000 374.00 314.00 60.00 332642 SGP 2012 03 01 21 18 00 2194-99 G co CCGG 152.210 -999.990 ... V4 2012 03 14 13 37 00 36.8000 -97.5000 374.00 314.00 60.00 332643 SGP 2012 03 08 20 23 00 1369-99 G co CCGG 146.150 -999.990 ... V4 2012 03 22 13 37 00 36.8000 -97.5000 374.00 314.00 60.00 333020 SGP 2012 03 08 20 23 00 4913-99 G co CCGG 146.160 -999.990 ... V4 2012 03 22 13 53 00 36.8000 -97.5000 374.00 314.00 60.00 333021 SGP 2012 03 15 19 46 00 2824-99 G co CCGG 128.820 -999.990 ... V4 2012 03 22 14 08 00 36.8000 -97.5000 374.00 314.00 60.00 333022 SGP 2012 03 15 19 46 00 3715-99 G co CCGG 128.860 -999.990 ... V4 2012 03 22 14 23 00 36.8000 -97.5000 374.00 314.00 60.00 333023 SGP 2012 03 22 19 24 00 3407-99 G co CCGG 147.150 -999.990 ... V4 2012 04 10 11 34 00 36.8000 -97.5000 374.00 314.00 60.00 333785 SGP 2012 03 22 19 24 00 6179-66 G co CCGG 146.950 -999.990 ... V4 2012 04 10 11 49 00 36.8000 -97.5000 374.00 314.00 60.00 333786 SGP 2012 03 29 19 27 00 191-99 G co CCGG 134.180 -999.990 ... V4 2012 04 10 11 04 00 36.8000 -97.5000 374.00 314.00 60.00 333787 SGP 2012 03 29 19 27 00 2135-99 G co CCGG 133.280 -999.990 ... V4 2012 04 10 11 19 00 36.8000 -97.5000 374.00 314.00 60.00 333788 SGP 2012 04 05 19 14 00 81-99 G co CCGG 172.070 -999.990 ... V4 2012 04 25 13 25 00 36.8000 -97.5000 374.00 314.00 60.00 334249 SGP 2012 04 05 19 14 00 82-99 G co CCGG 172.040 -999.990 ... V4 2012 04 25 13 40 00 36.8000 -97.5000 374.00 314.00 60.00 334250 SGP 2012 04 12 17 55 00 4937-99 G co CCGG 169.750 -999.990 ... V4 2012 04 25 12 55 00 36.8000 -97.5000 374.00 314.00 60.00 334251 SGP 2012 04 12 17 55 00 4938-99 G co CCGG 169.050 -999.990 ... V4 2012 04 25 13 10 00 36.8000 -97.5000 374.00 314.00 60.00 334252 SGP 2012 04 19 19 20 00 2989-99 G co CCGG 161.800 -999.990 ... V2 2012 05 14 15 07 00 36.8000 -97.5000 374.00 314.00 60.00 335255 SGP 2012 04 19 19 20 00 2990-99 G co CCGG 163.030 -999.990 ... V2 2012 05 14 15 24 00 36.8000 -97.5000 374.00 314.00 60.00 335256 SGP 2012 04 26 18 57 00 661-99 G co CCGG 138.070 -999.990 ... V2 2012 05 14 14 35 00 36.8000 -97.5000 374.00 314.00 60.00 335257 SGP 2012 04 26 18 57 00 662-99 G co CCGG 137.210 -999.990 ... V2 2012 05 14 14 51 00 36.8000 -97.5000 374.00 314.00 60.00 335258 SGP 2012 05 03 19 35 00 507-99 G co CCGG 143.650 -999.990 ... V4 2012 05 22 13 30 00 36.8000 -97.5000 374.00 314.00 60.00 335559 SGP 2012 05 03 19 35 00 5187-99 G co CCGG 143.110 -999.990 ... V4 2012 05 22 13 45 00 36.8000 -97.5000 374.00 314.00 60.00 335560 SGP 2012 05 10 20 37 00 1753-99 G co CCGG 146.430 -999.990 ... V4 2012 05 22 13 15 00 36.8000 -97.5000 374.00 314.00 60.00 335562 SGP 2012 05 10 20 37 00 887-99 G co CCGG 146.330 -999.990 ... V4 2012 05 22 12 59 00 36.8000 -97.5000 374.00 314.00 60.00 335561 SGP 2012 05 17 19 07 00 2995-99 G co CCGG 163.350 -999.990 ... V2 2012 06 01 12 17 00 36.8000 -97.5000 374.00 314.00 60.00 336227 SGP 2012 05 17 19 07 00 5124-99 G co CCGG 161.550 -999.990 ... V2 2012 06 01 12 33 00 36.8000 -97.5000 374.00 314.00 60.00 336228 SGP 2012 05 24 18 30 00 2996-99 G co CCGG 153.420 -999.990 ... V2 2012 06 01 11 40 00 36.8000 -97.5000 374.00 314.00 60.00 336225 SGP 2012 05 24 18 30 00 5123-99 G co CCGG 152.530 -999.990 ... V2 2012 06 01 11 57 00 36.8000 -97.5000 374.00 314.00 60.00 336226 SGP 2012 05 31 17 57 00 211-99 G co CCGG 126.800 -999.990 ... V4 2012 06 19 13 09 00 36.8000 -97.5000 374.00 314.00 60.00 337017 SGP 2012 05 31 17 57 00 3875-99 G co CCGG 125.730 -999.990 ... V4 2012 06 19 13 24 00 36.8000 -97.5000 374.00 314.00 60.00 337018 SGP 2012 06 07 19 03 00 1073-99 G co CCGG 161.600 -999.990 ... V4 2012 06 19 12 53 00 36.8000 -97.5000 374.00 314.00 60.00 337020 SGP 2012 06 07 19 03 00 542-99 G co CCGG 162.050 -999.990 ... V4 2012 06 19 12 38 00 36.8000 -97.5000 374.00 314.00 60.00 337019 SGP 2012 06 14 18 32 00 91-99 G co CCGG 132.880 -999.990 ... V4 2012 06 28 13 02 00 36.8000 -97.5000 374.00 314.00 60.00 337497 SGP 2012 06 14 18 32 00 92-99 G co CCGG 130.880 -999.990 ... V4 2012 06 28 13 18 00 36.8000 -97.5000 374.00 314.00 60.00 337498 SGP 2012 06 21 19 49 00 4419-99 G co CCGG 116.860 -999.990 ... V4 2012 06 28 13 33 00 36.8000 -97.5000 374.00 314.00 60.00 337499 SGP 2012 06 21 19 49 00 4420-99 G co CCGG 117.410 -999.990 ... V4 2012 06 28 13 48 00 36.8000 -97.5000 374.00 314.00 60.00 337500 SGP 2012 06 28 21 32 00 2794-99 G co CCGG 197.850 -999.990 .X. V4 2012 07 23 12 15 00 36.8000 -97.5000 374.00 314.00 60.00 338330 SGP 2012 06 28 21 32 00 3735-99 G co CCGG 197.090 -999.990 .X. V4 2012 07 23 12 30 00 36.8000 -97.5000 374.00 314.00 60.00 338331 SGP 2012 07 05 19 34 00 2360-99 G co CCGG 100.970 -999.990 ... V4 2012 07 23 11 44 00 36.8000 -97.5000 374.00 314.00 60.00 338332 SGP 2012 07 05 19 34 00 2857-99 G co CCGG 102.120 -999.990 ... V4 2012 07 23 12 00 00 36.8000 -97.5000 374.00 314.00 60.00 338333 SGP 2012 07 12 19 11 00 2385-99 G co CCGG 161.850 -999.990 ... V4 2012 08 09 09 24 00 36.6070 -97.4890 374.00 314.00 60.00 339053 SGP 2012 07 12 19 11 00 2386-99 G co CCGG 149.040 -999.990 N.. V4 2012 08 09 09 40 00 36.6070 -97.4890 374.00 314.00 60.00 339054 SGP 2012 07 19 19 13 00 3707-99 G co CCGG 109.350 -999.990 ... V4 2012 08 09 09 55 00 36.6070 -97.4890 374.00 314.00 60.00 339055 SGP 2012 07 19 19 13 00 3708-99 G co CCGG 109.290 -999.990 ... V4 2012 08 09 10 10 00 36.6070 -97.4890 374.00 314.00 60.00 339056 SGP 2012 07 26 20 59 00 5189-99 G co CCGG 118.640 -999.990 ... V4 2012 08 23 12 36 00 36.6070 -97.4890 374.00 314.00 60.00 339820 SGP 2012 07 26 20 59 00 5190-99 G co CCGG 118.830 -999.990 ... V4 2012 08 23 12 51 00 36.6070 -97.4890 374.00 314.00 60.00 339821 SGP 2012 08 02 19 29 00 5247-99 G co CCGG 155.690 -999.990 ... V4 2012 08 23 14 38 00 36.6070 -97.4890 374.00 314.00 60.00 339815 SGP 2012 08 09 19 31 00 4101-99 G co CCGG 128.680 -999.990 ... V4 2012 09 05 10 58 00 36.6070 -97.4890 374.00 314.00 60.00 340140 SGP 2012 08 09 19 31 00 439-99 G co CCGG 129.670 -999.990 ... V4 2012 09 05 10 42 00 36.6070 -97.4890 374.00 314.00 60.00 340139 SGP 2012 08 16 19 32 00 288-99 G co CCGG 161.410 -999.990 ... V4 2012 09 05 11 14 00 36.6070 -97.4890 374.00 314.00 60.00 340137 SGP 2012 08 16 19 32 00 412-99 G co CCGG 162.060 -999.990 ... V4 2012 09 05 11 29 00 36.6070 -97.4890 374.00 314.00 60.00 340138 SGP 2012 08 23 19 02 00 2743-99 G co CCGG 195.220 -999.990 ... V4 2012 09 13 15 19 00 36.6070 -97.4890 374.00 314.00 60.00 340836 SGP 2012 08 23 19 02 00 4201-99 G co CCGG 196.630 -999.990 ... V4 2012 09 13 15 34 00 36.6070 -97.4890 374.00 314.00 60.00 340837 SGP 2012 08 30 19 49 00 1968-99 G co CCGG 159.640 -999.990 ... V4 2012 09 13 14 48 00 36.6070 -97.4890 374.00 314.00 60.00 340834 SGP 2012 08 30 19 49 00 3549-99 G co CCGG 160.510 -999.990 ... V4 2012 09 13 15 03 00 36.6070 -97.4890 374.00 314.00 60.00 340835 SGP 2012 09 06 19 34 00 275-99 G co CCGG 116.930 -999.990 ... V4 2012 10 02 14 25 00 36.6070 -97.4890 374.00 314.00 60.00 341666 SGP 2012 09 06 19 34 00 276-99 G co CCGG 116.370 -999.990 ... V4 2012 10 02 14 40 00 36.6070 -97.4890 374.00 314.00 60.00 341667 SGP 2012 09 13 20 19 00 4203-99 G co CCGG 136.160 -999.990 ... V4 2012 10 02 13 54 00 36.6070 -97.4890 374.00 314.00 60.00 341664 SGP 2012 09 13 20 19 00 4204-99 G co CCGG 136.260 -999.990 ... V4 2012 10 02 14 09 00 36.6070 -97.4890 374.00 314.00 60.00 341665 SGP 2012 09 20 19 58 00 1723-99 G co CCGG 156.610 -999.990 ... V4 2012 10 15 12 21 00 36.6070 -97.4890 374.00 314.00 60.00 342233 SGP 2012 09 20 19 58 00 1724-99 G co CCGG 158.200 -999.990 ... V4 2012 10 15 12 36 00 36.6070 -97.4890 374.00 314.00 60.00 342234 SGP 2012 09 27 18 25 00 957-99 G co CCGG 121.400 -999.990 ... V4 2012 10 15 12 52 00 36.6070 -97.4890 374.00 314.00 60.00 342235 SGP 2012 09 27 18 25 00 958-99 G co CCGG 121.880 -999.990 ... V4 2012 10 15 13 07 00 36.6070 -97.4890 374.00 314.00 60.00 342236 SGP 2012 10 04 17 41 00 1185-99 G co CCGG 147.020 -999.990 ... V4 2012 10 31 09 20 00 36.6070 -97.4890 374.00 314.00 60.00 342927 SGP 2012 10 04 17 41 00 1195-99 G co CCGG 146.570 -999.990 ... V4 2012 10 31 09 36 00 36.6070 -97.4890 374.00 314.00 60.00 342928 SGP 2012 10 12 19 57 00 4738-99 G co CCGG 124.470 -999.990 ... V4 2012 10 31 09 51 00 36.6070 -97.4890 374.00 314.00 60.00 342929 SGP 2012 10 12 19 57 00 930-99 G co CCGG 124.690 -999.990 ... V4 2012 10 31 10 06 00 36.6070 -97.4890 374.00 314.00 60.00 342930 SGP 2012 10 18 19 46 00 7-99 G co CCGG 116.290 -999.990 ... V4 2012 11 15 12 00 00 36.6070 -97.4890 374.00 314.00 60.00 343524 SGP 2012 10 18 19 46 00 8-99 G co CCGG 116.160 -999.990 ... V4 2012 11 15 12 16 00 36.6070 -97.4890 374.00 314.00 60.00 343525 SGP 2012 10 25 19 20 00 4271-99 G co CCGG 121.980 -999.990 ... V4 2012 11 15 11 30 00 36.6070 -97.4890 374.00 314.00 60.00 343522 SGP 2012 10 25 19 20 00 4272-99 G co CCGG 122.680 -999.990 ... V4 2012 11 15 11 45 00 36.6070 -97.4890 374.00 314.00 60.00 343523 SGP 2012 11 01 19 02 00 1549-99 G co CCGG 169.220 -999.990 ... V4 2012 11 28 14 40 00 36.6070 -97.4890 374.00 314.00 60.00 344149 SGP 2012 11 01 19 02 00 1550-99 G co CCGG 169.360 -999.990 ... V4 2012 11 28 14 56 00 36.6070 -97.4890 374.00 314.00 60.00 344150 SGP 2012 11 08 21 03 00 4471-99 G co CCGG 153.130 -999.990 ... V4 2012 11 28 14 10 00 36.6070 -97.4890 374.00 314.00 60.00 344151 SGP 2012 11 08 21 03 00 4472-99 G co CCGG 153.290 -999.990 ... V4 2012 11 28 14 25 00 36.6070 -97.4890 374.00 314.00 60.00 344152 SGP 2012 11 15 20 24 00 1969-99 G co CCGG 166.060 -999.990 ... V4 2012 12 19 11 41 00 36.6070 -97.4890 374.00 314.00 60.00 344935 SGP 2012 11 15 20 24 00 2461-99 G co CCGG 166.030 -999.990 ... V4 2012 12 19 11 56 00 36.6070 -97.4890 374.00 314.00 60.00 344936 SGP 2012 11 29 20 29 00 2398-99 G co CCGG 154.220 -999.990 ... V2 2012 12 18 12 44 00 36.6070 -97.4890 374.00 314.00 60.00 344933 SGP 2012 11 29 20 29 00 3055-99 G co CCGG 152.070 -999.990 ... V2 2012 12 18 13 00 00 36.6070 -97.4890 374.00 314.00 60.00 344934 SGP 2012 12 06 21 19 00 3177-99 G co CCGG 178.670 -999.990 N.. V2 2013 01 11 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 345542 SGP 2012 12 06 21 19 00 3178-99 G co CCGG 177.830 -999.990 N.. V2 2013 01 11 12 25 00 36.6070 -97.4890 374.00 314.00 60.00 345543 SGP 2012 12 13 20 13 00 163-99 G co CCGG 249.530 -999.990 N.. V4 2013 01 10 11 50 00 36.6070 -97.4890 374.00 314.00 60.00 345540 SGP 2012 12 13 20 13 00 164-99 G co CCGG 245.410 -999.990 N.. V4 2013 01 10 12 05 00 36.6070 -97.4890 374.00 314.00 60.00 345541 SGP 2012 12 20 20 35 00 5053-99 G co CCGG 222.110 -999.990 N.. V4 2013 01 23 15 52 00 36.6070 -97.4890 374.00 314.00 60.00 346417 SGP 2012 12 20 20 35 00 959-99 G co CCGG 223.950 -999.990 N.. V4 2013 01 23 15 37 00 36.6070 -97.4890 374.00 314.00 60.00 346416 SGP 2012 12 27 21 10 00 507-99 G co CCGG 179.080 -999.990 ... V4 2013 01 23 15 21 00 36.6070 -97.4890 374.00 314.00 60.00 346415 SGP 2012 12 27 21 10 00 701-99 G co CCGG 180.500 -999.990 ... V4 2013 01 23 15 06 00 36.6070 -97.4890 374.00 314.00 60.00 346414 SGP 2013 01 03 19 38 00 1024-99 G co CCGG 137.760 -999.990 ... V2 2013 01 24 15 28 00 36.6070 -97.4890 374.00 314.00 60.00 346496 SGP 2013 01 03 19 38 00 1345-99 G co CCGG 137.960 -999.990 ... V2 2013 01 24 15 44 00 36.6070 -97.4890 374.00 314.00 60.00 346497 SGP 2013 01 10 20 42 00 1568-99 G co CCGG 319.660 -999.990 N.. V2 2013 01 24 16 00 00 36.6070 -97.4890 374.00 314.00 60.00 346494 SGP 2013 01 10 20 42 00 1838-99 G co CCGG 314.060 -999.990 N.. V2 2013 01 24 16 16 00 36.6070 -97.4890 374.00 314.00 60.00 346495 SGP 2013 01 17 21 00 00 1845-99 G co CCGG 149.500 -999.990 +.. V4 2013 01 31 09 59 00 36.6070 -97.4890 374.00 314.00 60.00 346910 SGP 2013 01 17 21 00 00 1846-99 G co CCGG 142.200 -999.990 N.. V4 2013 01 31 10 15 00 36.6070 -97.4890 374.00 314.00 60.00 346911 SGP 2013 01 24 21 37 00 1733-99 G co CCGG 151.440 -999.990 ... V4 2013 01 30 16 43 00 36.6070 -97.4890 374.00 314.00 60.00 346908 SGP 2013 01 24 21 37 00 1734-99 G co CCGG 152.640 -999.990 ... V4 2013 01 30 16 58 00 36.6070 -97.4890 374.00 314.00 60.00 346909 SGP 2013 01 31 21 18 00 1642-99 G co CCGG 154.360 -999.990 ... V4 2013 02 20 11 16 00 36.6070 -97.4890 374.00 314.00 60.00 347611 SGP 2013 01 31 21 18 00 4655-99 G co CCGG 154.150 -999.990 ... V4 2013 02 20 11 31 00 36.6070 -97.4890 374.00 314.00 60.00 347612 SGP 2013 02 06 19 00 00 2860-99 G co CCGG 150.260 -999.990 ... V4 2013 02 20 11 46 00 36.6070 -97.4890 374.00 314.00 60.00 347609 SGP 2013 02 06 19 00 00 5168-99 G co CCGG 150.300 -999.990 ... V4 2013 02 20 12 02 00 36.6070 -97.4890 374.00 314.00 60.00 347610 SGP 2013 02 14 19 47 00 4035-99 G co CCGG 150.120 -999.990 ... V2 2013 03 12 13 32 00 36.6070 -97.4890 374.00 314.00 60.00 348443 SGP 2013 02 14 19 47 00 4036-99 G co CCGG 147.960 -999.990 ... V2 2013 03 12 13 48 00 36.6070 -97.4890 374.00 314.00 60.00 348444 SGP 2013 02 22 21 00 00 3133-99 G co CCGG 174.760 -999.990 ... V2 2013 03 12 12 59 00 36.6070 -97.4890 374.00 314.00 60.00 348441 SGP 2013 02 22 21 00 00 3134-99 G co CCGG 172.630 -999.990 ... V2 2013 03 12 13 15 00 36.6070 -97.4890 374.00 314.00 60.00 348442 SGP 2013 02 28 19 46 00 1261-99 G co CCGG 142.760 -999.990 ... V2 2013 03 18 13 40 00 36.6070 -97.4890 374.00 314.00 60.00 348707 SGP 2013 02 28 19 46 00 1262-99 G co CCGG 144.550 -999.990 ... V2 2013 03 18 13 56 00 36.6070 -97.4890 374.00 314.00 60.00 348708 SGP 2013 03 07 19 20 00 945-99 G co CCGG 201.100 -999.990 -.. V2 2013 03 18 13 07 00 36.6070 -97.4890 374.00 314.00 60.00 348709 SGP 2013 03 07 19 20 00 946-99 G co CCGG 235.810 -999.990 +.. V2 2013 03 18 13 24 00 36.6070 -97.4890 374.00 314.00 60.00 348710 SGP 2013 03 14 19 17 00 4475-99 G co CCGG 185.010 -999.990 ... V4 2013 04 03 17 17 00 36.6070 -97.4890 374.00 314.00 60.00 349429 SGP 2013 03 14 19 17 00 4476-99 G co CCGG 185.660 -999.990 ... V4 2013 04 03 17 33 00 36.6070 -97.4890 374.00 314.00 60.00 349430 SGP 2013 03 21 19 25 00 1637-99 G co CCGG 214.600 -999.990 ... V4 2013 04 03 16 45 00 36.6070 -97.4890 374.00 314.00 60.00 349431 SGP 2013 03 21 19 25 00 1638-99 G co CCGG 214.810 -999.990 ... V4 2013 04 03 17 01 00 36.6070 -97.4890 374.00 314.00 60.00 349432 SGP 2013 03 29 17 53 00 3457-99 G co CCGG 178.580 -999.990 ... V4 2013 04 12 11 28 00 36.6070 -97.4890 374.00 314.00 60.00 350091 SGP 2013 03 29 17 53 00 3710-99 G co CCGG 177.460 -999.990 ... V4 2013 04 12 11 44 00 36.6070 -97.4890 374.00 314.00 60.00 350092 SGP 2013 04 05 18 25 00 3547-99 G co CCGG 161.920 -999.990 ... V4 2013 04 12 11 12 00 36.6070 -97.4890 374.00 314.00 60.00 350089 SGP 2013 04 05 18 25 00 570-99 G co CCGG 161.890 -999.990 ... V4 2013 04 12 10 56 00 36.6070 -97.4890 374.00 314.00 60.00 350090 SGP 2013 04 11 20 21 00 3607-99 G co CCGG 143.290 -999.990 ... V4 2013 05 10 11 26 00 36.6070 -97.4890 374.00 314.00 60.00 351025 SGP 2013 04 19 18 34 00 1664-99 G co CCGG 132.130 -999.990 ... V4 2013 05 10 11 42 00 36.6070 -97.4890 374.00 314.00 60.00 351028 SGP 2013 04 25 19 59 00 2535-99 G co CCGG 181.730 -999.990 ... V2 2013 05 23 13 48 00 36.6070 -97.4890 374.00 314.00 60.00 351828 SGP 2013 04 25 19 59 00 5168-99 G co CCGG 183.220 -999.990 ... V2 2013 05 23 14 04 00 36.6070 -97.4890 374.00 314.00 60.00 351829 SGP 2013 05 02 19 50 00 1386-99 G co CCGG 139.120 -999.990 ... V2 2013 05 23 14 20 00 36.6070 -97.4890 374.00 314.00 60.00 351830 SGP 2013 05 02 19 50 00 4290-99 G co CCGG 136.730 -999.990 ... V2 2013 05 23 14 36 00 36.6070 -97.4890 374.00 314.00 60.00 351831 SGP 2013 05 08 19 18 00 5222-99 G co CCGG 130.200 -999.990 ... V4 2013 06 05 09 35 00 36.6070 -97.4890 374.00 314.00 60.00 352380 SGP 2013 05 08 19 18 00 6510-66 G co CCGG 131.480 -999.990 ... V4 2013 06 05 09 51 00 36.6070 -97.4890 374.00 314.00 60.00 352381 SGP 2013 05 17 18 09 00 4866-99 G co CCGG 160.360 -999.990 ... V4 2013 06 05 10 07 00 36.6070 -97.4890 374.00 314.00 60.00 352378 SGP 2013 05 17 18 09 00 4967-99 G co CCGG 158.670 -999.990 ... V4 2013 06 05 10 23 00 36.6070 -97.4890 374.00 314.00 60.00 352379 SGP 2013 05 24 16 16 00 3042-99 G co CCGG 164.670 -999.990 ... V4 2013 06 13 13 52 00 36.6070 -97.4890 374.00 314.00 60.00 353197 SGP 2013 05 24 16 16 00 4792-99 G co CCGG 164.850 -999.990 ... V4 2013 06 13 14 08 00 36.6070 -97.4890 374.00 314.00 60.00 353198 SGP 2013 05 31 19 44 00 13-99 G co CCGG 130.690 -999.990 ... V4 2013 06 13 14 24 00 36.6070 -97.4890 374.00 314.00 60.00 353199 SGP 2013 05 31 19 44 00 836-99 G co CCGG 130.170 -999.990 ... V4 2013 06 13 14 40 00 36.6070 -97.4890 374.00 314.00 60.00 353200 SGP 2013 06 06 18 58 00 131-99 G co CCGG 114.470 -999.990 ... V2 2013 07 03 11 33 00 36.6070 -97.4890 374.00 314.00 60.00 353920 SGP 2013 06 06 18 58 00 132-99 G co CCGG 116.910 -999.990 ... V2 2013 07 03 11 49 00 36.6070 -97.4890 374.00 314.00 60.00 353921 SGP 2013 06 20 20 05 00 3469-99 G co CCGG 134.260 -999.990 ... V2 2013 07 03 12 06 00 36.6070 -97.4890 374.00 314.00 60.00 353922 SGP 2013 06 20 20 05 00 3470-99 G co CCGG 134.460 -999.990 ... V2 2013 07 03 12 22 00 36.6070 -97.4890 374.00 314.00 60.00 353923 SGP 2013 06 27 19 07 00 3051-99 G co CCGG 149.550 -999.990 ... V4 2013 07 24 10 48 00 36.6070 -97.4890 374.00 314.00 60.00 354594 SGP 2013 06 27 19 07 00 3172-99 G co CCGG 150.530 -999.990 ... V4 2013 07 24 11 04 00 36.6070 -97.4890 374.00 314.00 60.00 354595 SGP 2013 07 05 18 54 00 2918-99 G co CCGG 167.740 -999.990 ... V4 2013 07 24 11 20 00 36.6070 -97.4890 374.00 314.00 60.00 354592 SGP 2013 07 05 18 54 00 5406-99 G co CCGG 166.250 -999.990 ... V4 2013 07 24 11 36 00 36.6070 -97.4890 374.00 314.00 60.00 354593 SGP 2013 07 12 18 50 00 3543-99 G co CCGG 130.690 -999.990 ... V4 2013 08 06 10 20 00 36.6070 -97.4890 374.00 314.00 60.00 355246 SGP 2013 07 12 18 50 00 3544-99 G co CCGG 161.400 -999.990 A.. V4 2013 08 06 10 36 00 36.6070 -97.4890 374.00 314.00 60.00 355247 SGP 2013 07 12 18 50 00 3544-99 G co CCGG 130.650 -999.990 ... V4 2013 08 06 10 52 00 36.6070 -97.4890 374.00 314.00 60.00 355247 SGP 2013 07 18 19 05 00 4531-99 G co CCGG 106.670 -999.990 ... V4 2013 08 06 11 11 00 36.6070 -97.4890 374.00 314.00 60.00 355244 SGP 2013 07 18 19 05 00 4532-99 G co CCGG 105.940 -999.990 ... V4 2013 08 06 11 27 00 36.6070 -97.4890 374.00 314.00 60.00 355245 SGP 2013 07 25 19 26 00 2189-99 G co CCGG 144.150 -999.990 ... V4 2013 08 16 13 16 00 36.6070 -97.4890 374.00 314.00 60.00 356031 SGP 2013 07 25 19 26 00 881-99 G co CCGG 143.770 -999.990 ... V4 2013 08 16 13 00 00 36.6070 -97.4890 374.00 314.00 60.00 356030 SGP 2013 08 01 19 00 00 1576-99 G co CCGG 150.140 -999.990 ... V3 2013 09 23 10 19 00 36.6070 -97.4890 374.00 314.00 60.00 356029 SGP 2013 08 09 18 00 00 2824-99 G co CCGG 118.730 -999.990 ... V3 2013 09 23 10 51 00 36.6070 -97.4890 374.00 314.00 60.00 356993 SGP 2013 08 09 18 00 00 6037-66 G co CCGG 120.470 -999.990 ... V3 2013 09 23 11 07 00 36.6070 -97.4890 374.00 314.00 60.00 356994 SGP 2013 08 15 19 40 00 168-99 G co CCGG 174.890 -999.990 ... V4 2013 09 06 14 53 00 36.6070 -97.4890 374.00 314.00 60.00 356991 SGP 2013 08 15 19 40 00 1870-99 G co CCGG 175.950 -999.990 ... V4 2013 09 06 15 09 00 36.6070 -97.4890 374.00 314.00 60.00 356992 SGP 2013 08 22 18 23 00 5373-99 G co CCGG 113.150 -999.990 ... V4 2013 10 18 13 38 00 36.6070 -97.4890 374.00 314.00 60.00 357772 SGP 2013 08 22 18 23 00 5374-99 G co CCGG 113.290 -999.990 ... V4 2013 10 18 13 54 00 36.6070 -97.4890 374.00 314.00 60.00 357773 SGP 2013 08 29 19 13 00 2627-99 G co CCGG 94.390 -999.990 ... V4 2013 10 18 13 06 00 36.6070 -97.4890 374.00 314.00 60.00 357770 SGP 2013 08 29 19 13 00 2628-99 G co CCGG 94.210 -999.990 ... V4 2013 10 18 13 22 00 36.6070 -97.4890 374.00 314.00 60.00 357771 SGP 2013 09 05 19 36 00 867-99 G co CCGG 175.390 -999.990 ... V4 2013 10 30 13 59 00 36.6070 -97.4890 374.00 314.00 60.00 358319 SGP 2013 09 05 19 36 00 868-99 G co CCGG 175.110 -999.990 ... V4 2013 10 30 14 15 00 36.6070 -97.4890 374.00 314.00 60.00 358320 SGP 2013 09 12 18 40 00 49-99 G co CCGG 149.980 -999.990 ... V4 2013 10 30 14 31 00 36.6070 -97.4890 374.00 314.00 60.00 358317 SGP 2013 09 12 18 40 00 50-99 G co CCGG 150.380 -999.990 ... V4 2013 10 30 14 47 00 36.6070 -97.4890 374.00 314.00 60.00 358318 SGP 2013 09 19 19 22 00 2036-99 G co CCGG 95.850 -999.990 ... V4 2013 10 28 14 38 00 36.6070 -97.4890 374.00 314.00 60.00 358592 SGP 2013 09 19 19 22 00 3257-99 G co CCGG 96.240 -999.990 ... V4 2013 10 28 14 54 00 36.6070 -97.4890 374.00 314.00 60.00 358593 SGP 2013 09 30 18 00 00 155-99 G co CCGG 125.430 -999.990 ... V3 2013 10 28 14 08 00 36.6070 -97.4890 374.00 314.00 60.00 358590 SGP 2013 09 30 18 00 00 1607-99 G co CCGG 125.630 -999.990 ... V3 2013 10 28 14 25 00 36.6070 -97.4890 374.00 314.00 60.00 358591 SGP 2013 10 03 20 00 00 4244-99 G co CCGG 110.450 -999.990 ... V4 2013 11 13 14 28 00 36.6070 -97.4890 374.00 314.00 60.00 359010 SGP 2013 10 03 20 00 00 5099-99 G co CCGG 110.590 -999.990 ... V4 2013 11 13 14 44 00 36.6070 -97.4890 374.00 314.00 60.00 359011 SGP 2013 10 11 16 17 00 211-99 G co CCGG 133.820 -999.990 ... V4 2013 11 13 13 56 00 36.6070 -97.4890 374.00 314.00 60.00 359008 SGP 2013 10 11 16 17 00 3611-99 G co CCGG 133.840 -999.990 ... V4 2013 11 13 14 12 00 36.6070 -97.4890 374.00 314.00 60.00 359009 SGP 2013 10 17 19 39 00 258-99 G co CCGG 129.980 -999.990 ... V4 2013 11 14 15 25 00 36.6070 -97.4890 374.00 314.00 60.00 359698 SGP 2013 10 17 19 39 00 4746-99 G co CCGG 131.270 -999.990 ... V4 2013 11 14 15 41 00 36.6070 -97.4890 374.00 314.00 60.00 359699 SGP 2013 10 28 18 38 00 1946-99 G co CCGG 138.770 -999.990 ... V4 2013 11 14 15 57 00 36.6070 -97.4890 374.00 314.00 60.00 359696 SGP 2013 10 28 18 38 00 3458-99 G co CCGG 139.670 -999.990 ... V4 2013 11 14 16 13 00 36.6070 -97.4890 374.00 314.00 60.00 359697 SGP 2013 11 01 19 20 00 25-99 G co CCGG 101.180 -999.990 ... V4 2013 11 20 14 13 00 36.6070 -97.4890 374.00 314.00 60.00 360154 SGP 2013 11 01 19 20 00 3632-99 G co CCGG 101.320 -999.990 ... V4 2013 11 20 14 29 00 36.6070 -97.4890 374.00 314.00 60.00 360155 SGP 2013 11 07 18 00 00 6340-66 G co CCGG 117.300 -999.990 ... V3 2013 11 20 15 53 00 36.6070 -97.4890 374.00 314.00 60.00 360170 SGP 2013 11 07 18 00 00 6825-66 G co CCGG 117.080 -999.990 ... V3 2013 11 20 16 10 00 36.6070 -97.4890 374.00 314.00 60.00 360171 SGP 2013 11 15 19 27 00 1038-99 G co CCGG 144.000 -999.990 ... V4 2013 12 03 12 07 00 36.6070 -97.4890 374.00 314.00 60.00 360872 SGP 2013 11 15 19 27 00 4683-99 G co CCGG 142.610 -999.990 ... V4 2013 12 03 12 23 00 36.6070 -97.4890 374.00 314.00 60.00 360873 SGP 2013 11 25 18 49 00 5147-99 G co CCGG 139.760 -999.990 ... V4 2013 12 03 11 35 00 36.6070 -97.4890 374.00 314.00 60.00 360870 SGP 2013 11 25 18 49 00 6255-66 G co CCGG 139.470 -999.990 ... V4 2013 12 03 11 51 00 36.6070 -97.4890 374.00 314.00 60.00 360871 SGP 2013 11 27 19 07 00 3852-99 G co CCGG 117.850 -999.990 ... V4 2013 12 31 09 27 00 36.6070 -97.4890 374.00 314.00 60.00 361923 SGP 2013 11 27 19 07 00 5071-99 G co CCGG 118.240 -999.990 ... V4 2013 12 31 09 43 00 36.6070 -97.4890 374.00 314.00 60.00 361924 SGP 2013 12 06 18 54 00 5286-99 G co CCGG 119.960 -999.990 ... V4 2013 12 30 16 08 00 36.6070 -97.4890 374.00 314.00 60.00 361922 SGP 2013 12 06 18 54 00 970-99 G co CCGG 119.750 -999.990 ... V4 2013 12 30 15 52 00 36.6070 -97.4890 374.00 314.00 60.00 361921 SGP 2013 12 12 19 43 00 1548-99 G co CCGG 124.120 -999.990 ... V4 2014 01 08 14 02 00 36.6070 -97.4890 374.00 314.00 60.00 362261 SGP 2013 12 12 19 43 00 432-99 G co CCGG 124.430 -999.990 ... V4 2014 01 08 13 46 00 36.6070 -97.4890 374.00 314.00 60.00 362260 SGP 2013 12 12 19 55 00 3325-99 G co CCGG 146.630 -999.990 ... V4 2014 01 08 13 30 00 36.6070 -97.4890 374.00 314.00 60.00 362263 SGP 2013 12 12 19 55 00 425-99 G co CCGG 146.730 -999.990 ... V4 2014 01 08 13 14 00 36.6070 -97.4890 374.00 314.00 60.00 362262 SGP 2013 12 26 19 06 00 2801-99 G co CCGG 126.680 -999.990 ... V4 2014 01 09 11 25 00 36.6070 -97.4890 374.00 314.00 60.00 362406 SGP 2013 12 26 19 06 00 4424-99 G co CCGG 126.760 -999.990 ... V4 2014 01 09 11 41 00 36.6070 -97.4890 374.00 314.00 60.00 362407 SGP 2014 01 02 19 00 00 1533-99 G co CCGG 133.300 -999.990 ... V4 2014 01 09 11 57 00 36.6070 -97.4890 374.00 314.00 60.00 362404 SGP 2014 01 02 19 00 00 4717-99 G co CCGG 131.400 -999.990 ... V4 2014 01 09 12 13 00 36.6070 -97.4890 374.00 314.00 60.00 362405 SGP 2014 01 09 18 45 00 2937-99 G co CCGG 161.240 -999.990 ... V4 2014 02 07 12 31 00 36.6070 -97.4890 374.00 314.00 60.00 363507 SGP 2014 01 09 18 45 00 3853-99 G co CCGG 160.970 -999.990 ... V4 2014 02 07 12 47 00 36.6070 -97.4890 374.00 314.00 60.00 363508 SGP 2014 01 16 19 20 00 2385-99 G co CCGG 127.030 -999.990 ... V4 2014 02 07 13 19 00 36.6070 -97.4890 374.00 314.00 60.00 363510 SGP 2014 01 16 19 20 00 318-99 G co CCGG 126.820 -999.990 ... V4 2014 02 07 13 03 00 36.6070 -97.4890 374.00 314.00 60.00 363509 SGP 2014 01 23 21 00 00 365-99 G co CCGG 136.730 -999.990 ... V3 2014 02 24 12 14 00 36.6070 -97.4890 374.00 314.00 60.00 364244 SGP 2014 01 23 21 00 00 366-99 G co CCGG 136.910 -999.990 ... V3 2014 02 24 12 30 00 36.6070 -97.4890 374.00 314.00 60.00 364245 SGP 2014 01 30 20 00 00 4065-99 G co CCGG 144.660 -999.990 ... V3 2014 02 24 12 46 00 36.6070 -97.4890 374.00 314.00 60.00 364242 SGP 2014 01 30 20 00 00 4066-99 G co CCGG 144.460 -999.990 ... V3 2014 02 24 13 02 00 36.6070 -97.4890 374.00 314.00 60.00 364243 SGP 2014 02 14 19 31 00 1161-99 G co CCGG 128.130 -999.990 ... V4 2014 02 26 16 56 00 36.6070 -97.4890 374.00 314.00 60.00 364750 SGP 2014 02 14 19 31 00 1162-99 G co CCGG 127.610 -999.990 ... V4 2014 02 26 17 12 00 36.6070 -97.4890 374.00 314.00 60.00 364749 SGP 2014 02 20 20 13 00 3273-99 G co CCGG 132.310 -999.990 ... V3 2014 03 03 13 30 00 36.6070 -97.4890 374.00 314.00 60.00 364753 SGP 2014 02 20 20 13 00 3274-99 G co CCGG 132.100 -999.990 ... V3 2014 03 03 13 46 00 36.6070 -97.4890 374.00 314.00 60.00 364754 SGP 2014 02 27 20 18 00 3088-99 G co CCGG 137.460 -999.990 ... V4 2014 03 25 09 43 00 36.6070 -97.4890 374.00 314.00 60.00 365703 SGP 2014 02 27 20 18 00 4712-99 G co CCGG 136.890 -999.990 ... V4 2014 03 25 09 59 00 36.6070 -97.4890 374.00 314.00 60.00 365704 SGP 2014 03 06 19 00 00 5268-99 G co CCGG 171.050 -999.990 ... V4 2014 03 25 10 31 00 36.6070 -97.4890 374.00 314.00 60.00 365702 SGP 2014 03 06 19 00 00 872-99 G co CCGG 171.620 -999.990 ... V4 2014 03 25 10 15 00 36.6070 -97.4890 374.00 314.00 60.00 365701 SGP 2014 03 13 19 28 00 3012-99 G co CCGG 134.890 -999.990 ... V4 2014 04 02 15 43 00 36.6070 -97.4890 374.00 314.00 60.00 366000 SGP 2014 03 13 19 28 00 426-99 G co CCGG 134.780 -999.990 ... V4 2014 04 02 15 59 00 36.6070 -97.4890 374.00 314.00 60.00 366001 SGP 2014 03 20 19 35 00 1410-99 G co CCGG 150.910 -999.990 ... V4 2014 04 02 16 15 00 36.6070 -97.4890 374.00 314.00 60.00 366002 SGP 2014 03 20 19 35 00 256-99 G co CCGG 150.800 -999.990 ... V4 2014 04 02 16 31 00 36.6070 -97.4890 374.00 314.00 60.00 366003 SGP 2014 03 27 20 10 00 1398-99 G co CCGG 130.420 -999.990 ... V4 2014 04 14 14 53 00 36.6070 -97.4890 374.00 314.00 60.00 366476 SGP 2014 03 27 20 10 00 646-99 G co CCGG 131.210 -999.990 ... V4 2014 04 14 14 37 00 36.6070 -97.4890 374.00 314.00 60.00 366477 SGP 2014 04 03 19 42 00 4835-99 G co CCGG 162.950 -999.990 ... V4 2014 04 14 14 21 00 36.6070 -97.4890 374.00 314.00 60.00 366475 SGP 2014 04 03 19 42 00 6052-66 G co CCGG 161.740 -999.990 ... V4 2014 04 14 14 05 00 36.6070 -97.4890 374.00 314.00 60.00 366474 SGP 2014 04 11 17 47 00 1197-99 G co CCGG 191.020 -999.990 ... V4 2014 04 23 12 46 00 36.6070 -97.4890 374.00 314.00 60.00 366973 SGP 2014 04 11 17 47 00 4262-99 G co CCGG 192.020 -999.990 ... V4 2014 04 23 13 02 00 36.6070 -97.4890 374.00 314.00 60.00 366974 SGP 2014 04 17 18 39 00 1972-99 G co CCGG 163.570 -999.990 ... V4 2014 04 23 13 18 00 36.6070 -97.4890 374.00 314.00 60.00 366971 SGP 2014 04 17 18 39 00 4287-99 G co CCGG 165.670 -999.990 ... V4 2014 04 23 13 34 00 36.6070 -97.4890 374.00 314.00 60.00 366972 SGP 2014 04 24 19 20 00 1411-99 G co CCGG 135.420 -999.990 ... V4 2014 06 06 10 02 00 36.6070 -97.4890 374.00 314.00 60.00 368514 SGP 2014 04 24 19 20 00 2757-99 G co CCGG 134.610 -999.990 ... V4 2014 06 06 10 18 00 36.6070 -97.4890 374.00 314.00 60.00 368515 SGP 2014 05 13 18 47 00 3878-99 G co CCGG 126.070 -999.990 ... V4 2014 06 06 10 34 00 36.6070 -97.4890 374.00 314.00 60.00 368512 SGP 2014 05 13 18 47 00 4592-99 G co CCGG 126.400 -999.990 ... V4 2014 06 06 10 50 00 36.6070 -97.4890 374.00 314.00 60.00 368513 SGP 2014 05 16 19 00 00 4552-99 G co CCGG 142.020 -999.990 ... V4 2014 06 26 17 46 00 36.6070 -97.4890 374.00 314.00 60.00 369444 SGP 2014 05 16 19 00 00 4662-99 G co CCGG 141.330 -999.990 ... V4 2014 06 26 18 02 00 36.6070 -97.4890 374.00 314.00 60.00 369445 SGP 2014 05 22 18 36 00 3642-99 G co CCGG 130.960 -999.990 ... V4 2014 06 26 18 18 00 36.6070 -97.4890 374.00 314.00 60.00 369442 SGP 2014 05 22 18 36 00 4150-99 G co CCGG 131.030 -999.990 ... V4 2014 06 26 18 34 00 36.6070 -97.4890 374.00 314.00 60.00 369443 SGP 2014 06 05 19 48 00 591-99 G co CCGG 111.250 -999.990 ... V4 2014 07 09 16 09 00 36.6070 -97.4890 374.00 314.00 60.00 370133 SGP 2014 06 05 19 48 00 966-99 G co CCGG 111.980 -999.990 ... V4 2014 07 09 16 25 00 36.6070 -97.4890 374.00 314.00 60.00 370134 SGP 2014 06 19 18 24 00 3708-99 G co CCGG 93.870 -999.990 ... V4 2014 07 09 16 41 00 36.6070 -97.4890 374.00 314.00 60.00 370131 SGP 2014 06 19 18 24 00 4324-99 G co CCGG 93.960 -999.990 ... V4 2014 07 09 16 57 00 36.6070 -97.4890 374.00 314.00 60.00 370132 SGP 2014 06 26 18 25 00 1342-99 G co CCGG 126.160 -999.990 ... V4 2014 07 25 12 06 00 36.6070 -97.4890 374.00 314.00 60.00 371151 SGP 2014 06 26 18 25 00 2054-99 G co CCGG 126.050 -999.990 ... V4 2014 07 25 12 22 00 36.6070 -97.4890 374.00 314.00 60.00 371152 SGP 2014 07 03 19 43 00 1438-99 G co CCGG 113.550 -999.990 ... V4 2014 07 25 11 34 00 36.6070 -97.4890 374.00 314.00 60.00 371149 SGP 2014 07 03 19 43 00 5423-99 G co CCGG 112.830 -999.990 ... V4 2014 07 25 11 50 00 36.6070 -97.4890 374.00 314.00 60.00 371150 SGP 2014 07 11 18 00 00 2686-99 G co CCGG 94.470 -999.990 ... V4 2014 08 01 11 32 00 36.6070 -97.4890 374.00 314.00 60.00 371333 SGP 2014 07 11 18 00 00 4279-99 G co CCGG 95.140 -999.990 ... V4 2014 08 01 11 48 00 36.6070 -97.4890 374.00 314.00 60.00 371334 SGP 2014 07 18 19 12 00 3611-99 G co CCGG 133.090 -999.990 ... V4 2014 08 01 11 00 00 36.6070 -97.4890 374.00 314.00 60.00 371331 SGP 2014 07 18 19 12 00 6195-66 G co CCGG 133.840 -999.990 ... V4 2014 08 01 11 16 00 36.6070 -97.4890 374.00 314.00 60.00 371332 SGP 2014 08 01 19 24 00 6340-66 G co CCGG 136.390 -999.990 ... V4 2014 08 21 14 57 00 36.6070 -97.4890 374.00 314.00 60.00 372447 SGP 2014 08 01 19 24 00 6825-66 G co CCGG 136.680 -999.990 ... V4 2014 08 21 15 13 00 36.6070 -97.4890 374.00 314.00 60.00 372448 SGP 2014 08 11 19 34 00 1228-99 G co CCGG 129.150 -999.990 ... V4 2014 08 21 15 29 00 36.6070 -97.4890 374.00 314.00 60.00 372445 SGP 2014 08 11 19 34 00 4231-99 G co CCGG 127.320 -999.990 ... V4 2014 08 21 15 45 00 36.6070 -97.4890 374.00 314.00 60.00 372446 SGP 2014 08 14 19 00 00 185-99 G co CCGG 187.810 -999.990 .X. V4 2014 08 27 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 373004 SGP 2014 08 14 19 00 00 186-99 G co CCGG 187.620 -999.990 .X. V4 2014 08 27 12 24 00 36.6070 -97.4890 374.00 314.00 60.00 373005 SGP 2014 08 21 18 45 00 1843-99 G co CCGG 105.610 -999.990 ... V4 2014 08 27 11 36 00 36.6070 -97.4890 374.00 314.00 60.00 373002 SGP 2014 08 21 18 45 00 1844-99 G co CCGG 105.360 -999.990 ... V4 2014 08 27 11 52 00 36.6070 -97.4890 374.00 314.00 60.00 373003 SGP 2014 08 28 17 46 00 1753-99 G co CCGG 185.240 -999.990 .X. V4 2014 09 17 15 06 00 36.6070 -97.4890 374.00 314.00 60.00 374024 SGP 2014 08 28 17 46 00 2516-99 G co CCGG 184.520 -999.990 .X. V4 2014 09 17 15 22 00 36.6070 -97.4890 374.00 314.00 60.00 374025 SGP 2014 09 04 19 04 00 2296-99 G co CCGG 88.490 -999.990 ... V4 2014 09 17 14 34 00 36.6070 -97.4890 374.00 314.00 60.00 374022 SGP 2014 09 04 19 04 00 2816-99 G co CCGG 88.870 -999.990 ... V4 2014 09 17 14 50 00 36.6070 -97.4890 374.00 314.00 60.00 374023 SGP 2014 09 12 17 50 00 6681-66 G co CCGG 120.220 -999.990 ... V4 2014 10 02 14 41 00 36.6070 -97.4890 374.00 314.00 60.00 374764 SGP 2014 09 12 17 50 00 6682-66 G co CCGG 120.020 -999.990 ... V4 2014 10 02 14 57 00 36.6070 -97.4890 374.00 314.00 60.00 374765 SGP 2014 09 18 18 00 00 295-99 G co CCGG 105.960 -999.990 ... V4 2014 10 02 15 13 00 36.6070 -97.4890 374.00 314.00 60.00 374762 SGP 2014 09 18 18 00 00 296-99 G co CCGG 105.190 -999.990 ... V4 2014 10 02 15 29 00 36.6070 -97.4890 374.00 314.00 60.00 374763 SGP 2014 09 25 18 00 00 3555-99 G co CCGG 177.430 -999.990 .X. V4 2014 10 09 12 38 00 36.6070 -97.4890 374.00 314.00 60.00 375251 SGP 2014 09 25 18 00 00 3556-99 G co CCGG 177.930 -999.990 .X. V4 2014 10 09 12 54 00 36.6070 -97.4890 374.00 314.00 60.00 375252 SGP 2014 10 02 18 45 00 3441-99 G co CCGG 110.320 -999.990 ... V4 2014 10 09 13 10 00 36.6070 -97.4890 374.00 314.00 60.00 375249 SGP 2014 10 02 18 45 00 3442-99 G co CCGG 109.260 -999.990 ... V4 2014 10 09 13 26 00 36.6070 -97.4890 374.00 314.00 60.00 375250 SGP 2014 10 09 19 57 00 2577-99 G co CCGG 104.290 -999.990 ... V4 2014 10 23 10 26 00 36.6070 -97.4890 374.00 314.00 60.00 376118 SGP 2014 10 09 19 57 00 2578-99 G co CCGG 104.480 -999.990 ... V4 2014 10 23 10 42 00 36.6070 -97.4890 374.00 314.00 60.00 376119 SGP 2014 10 16 18 46 00 3931-99 G co CCGG 125.630 -999.990 ... V4 2014 10 23 14 13 00 36.6070 -97.4890 374.00 314.00 60.00 376122 SGP 2014 10 16 18 46 00 3932-99 G co CCGG 124.420 -999.990 ... V4 2014 10 23 14 29 00 36.6070 -97.4890 374.00 314.00 60.00 376123 SGP 2014 10 23 19 38 00 3036-99 G co CCGG 154.640 -999.990 ... V4 2014 11 20 14 18 00 36.6070 -97.4890 374.00 314.00 60.00 377275 SGP 2014 10 23 19 38 00 312-99 G co CCGG 154.560 -999.990 ... V4 2014 11 20 14 34 00 36.6070 -97.4890 374.00 314.00 60.00 377276 SGP 2014 10 30 18 15 00 2969-99 G co CCGG 116.460 -999.990 ... V4 2014 11 20 15 06 00 36.6070 -97.4890 374.00 314.00 60.00 377273 SGP 2014 10 30 18 15 00 954-99 G co CCGG 116.330 -999.990 ... V4 2014 11 20 14 50 00 36.6070 -97.4890 374.00 314.00 60.00 377274 SGP 2014 11 06 19 47 00 250-99 G co CCGG 117.920 -999.990 ... V4 2014 12 04 14 00 00 36.6070 -97.4890 374.00 314.00 60.00 377861 SGP 2014 11 06 19 47 00 4978-99 G co CCGG 119.060 -999.990 ... V4 2014 12 04 14 16 00 36.6070 -97.4890 374.00 314.00 60.00 377862 SGP 2014 11 13 19 30 00 1727-99 G co CCGG 118.930 -999.990 ... V4 2014 12 04 14 32 00 36.6070 -97.4890 374.00 314.00 60.00 377859 SGP 2014 11 13 19 30 00 2834-99 G co CCGG 117.940 -999.990 ... V4 2014 12 04 14 48 00 36.6070 -97.4890 374.00 314.00 60.00 377860 SGP 2014 11 20 20 28 00 1257-99 G co CCGG 141.700 -999.990 ... V4 2014 12 15 14 08 00 36.6070 -97.4890 374.00 314.00 60.00 378372 SGP 2014 11 20 20 28 00 1258-99 G co CCGG 140.740 -999.990 ... V4 2014 12 15 14 24 00 36.6070 -97.4890 374.00 314.00 60.00 378373 SGP 2014 11 26 20 42 00 4125-99 G co CCGG 124.250 -999.990 ... V4 2014 12 15 14 40 00 36.6070 -97.4890 374.00 314.00 60.00 378374 SGP 2014 11 26 20 42 00 4126-99 G co CCGG 123.700 -999.990 ... V4 2014 12 15 14 56 00 36.6070 -97.4890 374.00 314.00 60.00 378375 SGP 2014 12 04 19 42 00 179-99 G co CCGG 194.290 -999.990 ... V4 2015 01 09 10 43 00 36.6070 -97.4890 374.00 314.00 60.00 379594 SGP 2014 12 04 19 42 00 240-99 G co CCGG 196.040 -999.990 ... V4 2015 01 09 10 59 00 36.6070 -97.4890 374.00 314.00 60.00 379595 SGP 2014 12 11 19 31 00 3614-99 G co CCGG 189.620 -999.990 ... V4 2015 01 09 11 15 00 36.6070 -97.4890 374.00 314.00 60.00 379592 SGP 2014 12 11 19 31 00 4780-99 G co CCGG 189.630 -999.990 ... V4 2015 01 09 11 31 00 36.6070 -97.4890 374.00 314.00 60.00 379593 SGP 2014 12 19 19 44 00 1487-99 G co CCGG 150.280 -999.990 ... V4 2015 01 26 16 05 00 36.6070 -97.4890 374.00 314.00 60.00 380069 SGP 2014 12 19 19 44 00 1569-99 G co CCGG 151.190 -999.990 ... V4 2015 01 26 16 21 00 36.6070 -97.4890 374.00 314.00 60.00 380070 SGP 2014 12 26 19 38 00 1462-99 G co CCGG 143.720 -999.990 ... V4 2015 01 21 16 44 00 36.6070 -97.4890 374.00 314.00 60.00 379956 SGP 2014 12 26 19 38 00 4607-99 G co CCGG 142.460 -999.990 ... V4 2015 01 21 17 00 00 36.6070 -97.4890 374.00 314.00 60.00 379957 SGP 2015 01 02 18 54 00 4231-99 G co CCGG 171.630 -999.990 ... V4 2015 02 11 12 09 00 36.6070 -97.4890 374.00 314.00 60.00 380814 SGP 2015 01 02 18 54 00 5321-99 G co CCGG 172.120 -999.990 ... V4 2015 02 11 12 25 00 36.6070 -97.4890 374.00 314.00 60.00 380815 SGP 2015 01 08 20 39 00 3716-99 G co CCGG 136.680 -999.990 ... V4 2015 02 11 12 41 00 36.6070 -97.4890 374.00 314.00 60.00 380812 SGP 2015 01 08 20 39 00 4695-99 G co CCGG 135.530 -999.990 ... V4 2015 02 11 12 57 00 36.6070 -97.4890 374.00 314.00 60.00 380813 SGP 2015 01 16 20 00 00 4573-99 G co CCGG 130.020 -999.990 ... V4 2015 02 20 11 16 00 36.6070 -97.4890 374.00 314.00 60.00 381439 SGP 2015 01 16 20 00 00 4574-99 G co CCGG 128.970 -999.990 ... V4 2015 02 20 11 32 00 36.6070 -97.4890 374.00 314.00 60.00 381438 SGP 2015 01 21 20 10 00 2841-99 G co CCGG 159.350 -999.990 ... V4 2015 02 20 09 56 00 36.6070 -97.4890 374.00 314.00 60.00 381436 SGP 2015 01 21 20 10 00 2842-99 G co CCGG 158.160 -999.990 ... V4 2015 02 20 10 12 00 36.6070 -97.4890 374.00 314.00 60.00 381437 SGP 2015 01 30 20 30 00 4723-99 G co CCGG 140.410 -999.990 ... V4 2015 03 10 13 50 00 36.6070 -97.4890 374.00 314.00 60.00 382021 SGP 2015 01 30 20 30 00 4724-99 G co CCGG 139.390 -999.990 ... V4 2015 03 10 14 06 00 36.6070 -97.4890 374.00 314.00 60.00 382022 SGP 2015 02 06 20 22 00 3439-99 G co CCGG 143.610 -999.990 ... V4 2015 03 11 11 33 00 36.6070 -97.4890 374.00 314.00 60.00 382085 SGP 2015 02 06 20 22 00 3440-99 G co CCGG 143.380 -999.990 ... V4 2015 03 11 11 48 00 36.6070 -97.4890 374.00 314.00 60.00 382086 SGP 2015 02 12 20 10 00 531-99 G co CCGG 144.380 -999.990 ... V4 2015 03 23 16 01 00 36.6070 -97.4890 374.00 314.00 60.00 382954 SGP 2015 02 12 20 10 00 532-99 G co CCGG 285.820 -999.990 A.. V4 2015 03 23 16 17 00 36.6070 -97.4890 374.00 314.00 60.00 382955 SGP 2015 02 12 20 10 00 532-99 G co CCGG 144.020 -999.990 ... V4 2015 03 24 10 51 00 36.6070 -97.4890 374.00 314.00 60.00 382955 SGP 2015 02 19 20 28 00 2017-99 G co CCGG 166.530 -999.990 ... V4 2015 03 23 10 53 00 36.6070 -97.4890 374.00 314.00 60.00 382952 SGP 2015 02 19 20 28 00 2018-99 G co CCGG 167.460 -999.990 ... V4 2015 03 23 11 09 00 36.6070 -97.4890 374.00 314.00 60.00 382953 SGP 2015 02 26 20 00 00 5011-99 G co CCGG 195.680 -999.990 ... V4 2015 04 01 17 17 00 36.6070 -97.4890 374.00 314.00 60.00 383832 SGP 2015 02 26 20 00 00 5012-99 G co CCGG 196.150 -999.990 ... V4 2015 04 01 17 33 00 36.6070 -97.4890 374.00 314.00 60.00 383833 SGP 2015 03 05 20 25 00 3191-99 G co CCGG 153.100 -999.990 ... V4 2015 04 02 09 33 00 36.6070 -97.4890 374.00 314.00 60.00 383835 SGP 2015 03 05 20 25 00 3192-99 G co CCGG 152.700 -999.990 ... V4 2015 04 02 09 49 00 36.6070 -97.4890 374.00 314.00 60.00 383834 SGP 2015 03 12 18 24 00 3529-99 G co CCGG 259.050 -999.990 .X. V4 2015 04 13 15 03 00 36.6070 -97.4890 374.00 314.00 60.00 384328 SGP 2015 03 12 18 24 00 3530-99 G co CCGG 259.100 -999.990 .X. V4 2015 04 13 15 19 00 36.6070 -97.4890 374.00 314.00 60.00 384329 SGP 2015 03 19 19 00 00 2711-99 G co CCGG 170.970 -999.990 ... V4 2015 04 13 12 08 00 36.6070 -97.4890 374.00 314.00 60.00 384314 SGP 2015 03 19 19 00 00 2712-99 G co CCGG 171.900 -999.990 ... V4 2015 04 13 12 24 00 36.6070 -97.4890 374.00 314.00 60.00 384315 SGP 2015 04 23 19 21 00 2363-99 G co CCGG 164.410 -999.990 ... V4 2015 05 28 12 47 00 36.6070 -97.4890 374.00 314.00 60.00 386712 SGP 2015 04 23 19 21 00 2364-99 G co CCGG 165.290 -999.990 ... V4 2015 05 28 13 03 00 36.6070 -97.4890 374.00 314.00 60.00 386713 SGP 2015 04 30 19 51 00 2045-99 G co CCGG 145.080 -999.990 ... V4 2015 05 28 12 16 00 36.6070 -97.4890 374.00 314.00 60.00 386710 SGP 2015 04 30 19 51 00 2046-99 G co CCGG 145.250 -999.990 ... V4 2015 05 28 12 32 00 36.6070 -97.4890 374.00 314.00 60.00 386711 SGP 2015 05 06 19 25 00 2131-99 G co CCGG 134.490 -999.990 ... V4 2015 06 29 14 43 00 36.6070 -97.4890 374.00 314.00 60.00 387394 SGP 2015 05 06 19 25 00 3915-99 G co CCGG 135.960 -999.990 ... V4 2015 06 29 14 59 00 36.6070 -97.4890 374.00 314.00 60.00 387395 SGP 2015 05 13 19 11 00 2790-99 G co CCGG 148.920 -999.990 ... V4 2015 06 29 14 11 00 36.6070 -97.4890 374.00 314.00 60.00 387392 SGP 2015 05 13 19 11 00 4697-99 G co CCGG 148.250 -999.990 ... V4 2015 06 29 14 27 00 36.6070 -97.4890 374.00 314.00 60.00 387393 SGP 2015 05 21 18 47 00 3408-99 G co CCGG 123.270 -999.990 ... V4 2015 07 08 17 00 00 36.6070 -97.4890 374.00 314.00 60.00 388473 SGP 2015 05 21 18 47 00 4940-99 G co CCGG 123.040 -999.990 ... V4 2015 07 08 17 16 00 36.6070 -97.4890 374.00 314.00 60.00 388474 SGP 2015 05 29 18 26 00 1300-99 G co CCGG 122.950 -999.990 ... V4 2015 07 08 16 29 00 36.6070 -97.4890 374.00 314.00 60.00 388471 SGP 2015 05 29 18 26 00 2997-99 G co CCGG 122.890 -999.990 ... V4 2015 07 08 16 45 00 36.6070 -97.4890 374.00 314.00 60.00 388472 SGP 2015 06 04 19 50 00 3579-99 G co CCGG 141.170 -999.990 ... V4 2015 07 15 11 07 00 36.6070 -97.4890 374.00 314.00 60.00 389443 SGP 2015 06 04 19 50 00 3580-99 G co CCGG 140.810 -999.990 ... V4 2015 07 15 11 23 00 36.6070 -97.4890 374.00 314.00 60.00 389444 SGP 2015 06 11 18 22 00 525-99 G co CCGG 124.290 -999.990 ... V4 2015 07 15 11 39 00 36.6070 -97.4890 374.00 314.00 60.00 389445 SGP 2015 06 11 18 22 00 526-99 G co CCGG 124.070 -999.990 ... V4 2015 07 15 11 55 00 36.6070 -97.4890 374.00 314.00 60.00 389446 SGP 2015 06 19 19 08 00 3813-99 G co CCGG 111.210 -999.990 ... V4 2015 07 23 14 39 00 36.6070 -97.4890 374.00 314.00 60.00 389967 SGP 2015 06 19 19 08 00 3814-99 G co CCGG 111.090 -999.990 ... V4 2015 07 23 14 55 00 36.6070 -97.4890 374.00 314.00 60.00 389966 SGP 2015 06 26 19 55 00 247-99 G co CCGG 105.700 -999.990 ... V4 2015 07 23 14 08 00 36.6070 -97.4890 374.00 314.00 60.00 389968 SGP 2015 06 26 19 55 00 248-99 G co CCGG 103.980 -999.990 ... V4 2015 07 23 14 23 00 36.6070 -97.4890 374.00 314.00 60.00 389969 SGP 2015 07 01 19 07 00 3614-99 G co CCGG 98.910 -999.990 ... V4 2015 08 05 16 55 00 36.6070 -97.4890 374.00 314.00 60.00 390693 SGP 2015 07 01 19 07 00 803-99 G co CCGG 99.660 -999.990 ... V4 2015 08 05 16 39 00 36.6070 -97.4890 374.00 314.00 60.00 390694 SGP 2015 07 09 19 24 00 4780-99 G co CCGG 188.170 -999.990 .X. V4 2015 08 05 16 23 00 36.6070 -97.4890 374.00 314.00 60.00 390692 SGP 2015 07 09 19 24 00 894-99 G co CCGG 189.320 -999.990 .X. V4 2015 08 05 16 07 00 36.6070 -97.4890 374.00 314.00 60.00 390691 SGP 2015 07 17 16 16 00 2627-99 G co CCGG 107.210 -999.990 ... V4 2015 08 18 15 39 00 36.6070 -97.4890 374.00 314.00 60.00 391559 SGP 2015 07 17 16 16 00 735-99 G co CCGG 108.260 -999.990 ... V4 2015 08 18 15 23 00 36.6070 -97.4890 374.00 314.00 60.00 391558 SGP 2015 07 23 20 38 00 2463-99 G co CCGG 123.780 -999.990 ... V4 2015 08 18 14 51 00 36.6070 -97.4890 374.00 314.00 60.00 391561 SGP 2015 07 23 20 38 00 4135-99 G co CCGG 124.480 -999.990 ... V4 2015 08 18 15 07 00 36.6070 -97.4890 374.00 314.00 60.00 391560 SGP 2015 07 30 20 48 00 4703-99 G co CCGG 107.990 -999.990 ... V4 2015 08 31 10 22 00 36.6070 -97.4890 374.00 314.00 60.00 392114 SGP 2015 07 30 20 48 00 4704-99 G co CCGG 106.610 -999.990 ... V4 2015 08 31 10 37 00 36.6070 -97.4890 374.00 314.00 60.00 392115 SGP 2015 08 05 18 31 00 217-99 G co CCGG 144.220 -999.990 ... V4 2015 08 31 09 50 00 36.6070 -97.4890 374.00 314.00 60.00 392116 SGP 2015 08 05 18 31 00 218-99 G co CCGG 143.110 -999.990 ... V4 2015 08 31 10 06 00 36.6070 -97.4890 374.00 314.00 60.00 392117 SGP 2015 08 12 20 30 00 1369-99 G co CCGG 133.690 -999.990 ... V4 2015 09 11 11 18 00 36.6070 -97.4890 374.00 314.00 60.00 393202 SGP 2015 08 12 20 30 00 180-99 G co CCGG 133.840 -999.990 ... V4 2015 09 11 11 02 00 36.6070 -97.4890 374.00 314.00 60.00 393201 SGP 2015 08 19 20 47 00 2211-99 G co CCGG 117.830 -999.990 ... V4 2015 09 11 11 34 00 36.6070 -97.4890 374.00 314.00 60.00 393203 SGP 2015 08 19 20 47 00 3496-99 G co CCGG 117.930 -999.990 ... V4 2015 09 11 11 49 00 36.6070 -97.4890 374.00 314.00 60.00 393204 SGP 2015 08 26 20 00 00 4649-99 G co CCGG 170.060 -999.990 ... V4 2015 09 17 09 06 00 36.6070 -97.4890 374.00 314.00 60.00 393736 SGP 2015 08 26 20 00 00 4650-99 G co CCGG 170.210 -999.990 ... V4 2015 09 17 09 22 00 36.6070 -97.4890 374.00 314.00 60.00 393737 SGP 2015 09 02 19 14 00 5399-99 G co CCGG 106.540 -999.990 ... V4 2015 09 16 17 03 00 36.6070 -97.4890 374.00 314.00 60.00 393734 SGP 2015 09 02 19 14 00 5400-99 G co CCGG 107.490 -999.990 ... V4 2015 09 16 17 19 00 36.6070 -97.4890 374.00 314.00 60.00 393735 SGP 2015 09 09 19 30 00 1972-99 G co CCGG 110.770 -999.990 ... V4 2015 10 05 11 08 00 36.6070 -97.4890 374.00 314.00 60.00 394641 SGP 2015 09 09 19 30 00 3245-99 G co CCGG 111.450 -999.990 ... V4 2015 10 05 11 23 00 36.6070 -97.4890 374.00 314.00 60.00 394642 SGP 2015 09 09 19 48 00 2300-99 G co CCGG 97.020 -999.990 ... V4 2015 10 05 10 36 00 36.6070 -97.4890 374.00 314.00 60.00 394639 SGP 2015 09 09 19 48 00 2353-99 G co CCGG 96.440 -999.990 ... V4 2015 10 05 10 52 00 36.6070 -97.4890 374.00 314.00 60.00 394640 SGP 2015 09 25 17 32 00 3910-99 G co CCGG 168.250 -999.990 ... V4 2015 10 21 12 47 00 36.6070 -97.4890 374.00 314.00 60.00 395591 SGP 2015 09 25 17 32 00 4518-99 G co CCGG 168.000 -999.990 ... V4 2015 10 21 13 02 00 36.6070 -97.4890 374.00 314.00 60.00 395592 SGP 2015 10 02 15 34 00 3504-99 G co CCGG 127.720 -999.990 ... V4 2015 10 21 12 31 00 36.6070 -97.4890 374.00 314.00 60.00 395594 SGP 2015 10 02 15 34 00 738-99 G co CCGG 127.130 -999.990 ... V4 2015 10 21 12 15 00 36.6070 -97.4890 374.00 314.00 60.00 395593 SGP 2015 10 08 14 07 00 5301-99 G co CCGG 182.090 -999.990 N.. V4 2015 10 29 12 43 00 36.6070 -97.4890 374.00 314.00 60.00 396553 SGP 2015 10 08 14 07 00 5302-99 G co CCGG 177.550 -999.990 N.. V4 2015 10 29 12 27 00 36.6070 -97.4890 374.00 314.00 60.00 396554 SGP 2015 10 15 19 15 00 3963-99 G co CCGG 143.430 -999.990 ... V4 2015 10 28 11 15 00 36.6070 -97.4890 374.00 314.00 60.00 396451 SGP 2015 10 15 19 15 00 3964-99 G co CCGG 143.170 -999.990 ... V4 2015 10 28 11 31 00 36.6070 -97.4890 374.00 314.00 60.00 396452 SGP 2015 10 22 20 45 00 1636-99 G co CCGG 133.190 -999.990 ... V4 2015 11 12 13 55 00 36.6070 -97.4890 374.00 314.00 60.00 397362 SGP 2015 10 22 20 45 00 517-99 G co CCGG 133.500 -999.990 ... V4 2015 11 12 14 11 00 36.6070 -97.4890 374.00 314.00 60.00 397363 SGP 2015 10 29 15 27 00 1026-99 G co CCGG 114.980 -999.990 ... V4 2015 11 12 14 27 00 36.6070 -97.4890 374.00 314.00 60.00 397364 SGP 2015 10 29 15 27 00 5385-99 G co CCGG 114.080 -999.990 ... V4 2015 11 12 14 42 00 36.6070 -97.4890 374.00 314.00 60.00 397365 SGP 2015 11 05 15 14 00 109-99 G co CCGG 153.120 -999.990 ... V4 2015 11 27 14 44 00 36.6070 -97.4890 374.00 314.00 60.00 398155 SGP 2015 11 05 15 14 00 2314-99 G co CCGG 153.470 -999.990 ... V4 2015 11 27 14 28 00 36.6070 -97.4890 374.00 314.00 60.00 398156 SGP 2015 11 12 16 50 00 2027-99 G co CCGG 130.380 -999.990 ... V4 2015 11 27 15 00 00 36.6070 -97.4890 374.00 314.00 60.00 398154 SGP 2015 11 12 16 50 00 440-99 G co CCGG 130.440 -999.990 ... V4 2015 11 27 15 15 00 36.6070 -97.4890 374.00 314.00 60.00 398153 SGP 2015 11 19 15 31 00 1106-99 G co CCGG 121.680 -999.990 ... V4 2015 12 08 14 14 00 36.6070 -97.4890 374.00 314.00 60.00 398671 SGP 2015 11 19 15 31 00 5104-99 G co CCGG 121.020 -999.990 ... V4 2015 12 08 13 58 00 36.6070 -97.4890 374.00 314.00 60.00 398672 SGP 2015 11 25 15 13 00 1197-99 G co CCGG 144.170 -999.990 ... V4 2015 12 08 12 39 00 36.6070 -97.4890 374.00 314.00 60.00 398670 SGP 2015 11 25 15 13 00 3186-99 G co CCGG 143.460 -999.990 ... V4 2015 12 08 12 24 00 36.6070 -97.4890 374.00 314.00 60.00 398669 SGP 2015 12 03 15 13 00 3526-99 G co CCGG 146.410 -999.990 ... V4 2015 12 31 13 21 00 36.6070 -97.4890 374.00 314.00 60.00 399265 SGP 2015 12 03 15 13 00 4064-99 G co CCGG 145.580 -999.990 ... V4 2015 12 31 13 36 00 36.6070 -97.4890 374.00 314.00 60.00 399266 SGP 2015 12 10 20 00 00 1764-99 G co CCGG 116.010 -999.990 ... V4 2015 12 31 13 52 00 36.6070 -97.4890 374.00 314.00 60.00 399263 SGP 2015 12 10 20 00 00 312-99 G co CCGG 116.170 -999.990 ... V4 2015 12 31 14 08 00 36.6070 -97.4890 374.00 314.00 60.00 399264 SGP 2015 12 17 19 56 00 1081-99 G co CCGG 143.410 -999.990 +.. V4 2016 01 19 13 46 00 36.6070 -97.4890 374.00 314.00 60.00 400360 SGP 2015 12 17 19 56 00 2333-99 G co CCGG 142.650 -999.990 +.. V4 2016 01 19 14 02 00 36.6070 -97.4890 374.00 314.00 60.00 400359 SGP 2015 12 23 20 03 00 1998-99 G co CCGG 123.820 -999.990 -.. V4 2016 01 19 13 13 00 36.6070 -97.4890 374.00 314.00 60.00 400358 SGP 2015 12 23 20 03 00 4279-99 G co CCGG 123.250 -999.990 -.. V4 2016 01 19 13 29 00 36.6070 -97.4890 374.00 314.00 60.00 400361 SGP 2015 12 31 20 00 00 1371-99 G co CCGG 141.950 -999.990 ... V4 2016 01 22 12 20 00 36.6070 -97.4890 374.00 314.00 60.00 400436 SGP 2015 12 31 20 00 00 3236-99 G co CCGG 141.350 -999.990 ... V4 2016 01 22 12 36 00 36.6070 -97.4890 374.00 314.00 60.00 400437 SGP 2016 01 07 20 00 00 2573-99 G co CCGG 198.300 -999.990 .X. V4 2016 01 22 12 52 00 36.6070 -97.4890 374.00 314.00 60.00 400434 SGP 2016 01 07 20 00 00 376-99 G co CCGG 199.190 -999.990 .X. V4 2016 01 22 13 08 00 36.6070 -97.4890 374.00 314.00 60.00 400435 SGP 2016 01 14 20 00 00 3445-99 G co CCGG 141.410 -999.990 ... V4 2016 02 08 16 53 00 36.6070 -97.4890 374.00 314.00 60.00 401391 SGP 2016 01 14 20 00 00 800-99 G co CCGG 142.410 -999.990 ... V4 2016 02 08 16 37 00 36.6070 -97.4890 374.00 314.00 60.00 401390 SGP 2016 01 21 20 00 00 2173-99 G co CCGG 169.360 -999.990 ... V4 2016 02 08 16 22 00 36.6070 -97.4890 374.00 314.00 60.00 401392 SGP 2016 01 21 20 00 00 340-99 G co CCGG 168.440 -999.990 ... V4 2016 02 08 16 06 00 36.6070 -97.4890 374.00 314.00 60.00 401393 SGP 2016 01 28 20 00 00 2021-99 G co CCGG 129.650 -999.990 ... V4 2016 02 18 12 16 00 36.6070 -97.4890 374.00 314.00 60.00 402173 SGP 2016 01 28 20 00 00 390-99 G co CCGG 129.500 -999.990 ... V4 2016 02 18 12 00 00 36.6070 -97.4890 374.00 314.00 60.00 402174 SGP 2016 02 04 20 00 00 2022-99 G co CCGG 137.200 -999.990 ... V4 2016 02 18 10 57 00 36.6070 -97.4890 374.00 314.00 60.00 402171 SGP 2016 02 04 20 00 00 389-99 G co CCGG 138.040 -999.990 ... V4 2016 02 18 11 13 00 36.6070 -97.4890 374.00 314.00 60.00 402172 SGP 2016 02 11 20 00 00 2830-99 G co CCGG 162.120 -999.990 ... V4 2016 03 02 13 09 00 36.6070 -97.4890 374.00 314.00 60.00 402768 SGP 2016 02 11 20 00 00 5424-99 G co CCGG 161.590 -999.990 ... V4 2016 03 02 13 25 00 36.6070 -97.4890 374.00 314.00 60.00 402769 SGP 2016 02 18 20 00 00 2139-99 G co CCGG 123.960 -999.990 N.. V4 2016 03 02 12 38 00 36.6070 -97.4890 374.00 314.00 60.00 402770 SGP 2016 02 18 20 00 00 3891-99 G co CCGG 123.940 -999.990 N.. V4 2016 03 02 12 54 00 36.6070 -97.4890 374.00 314.00 60.00 402771 SGP 2016 02 25 20 00 00 1475-99 G co CCGG 148.360 -999.990 ... V4 2016 03 11 13 37 00 36.6070 -97.4890 374.00 314.00 60.00 403393 SGP 2016 02 25 20 00 00 4199-99 G co CCGG 147.970 -999.990 ... V4 2016 03 11 13 52 00 36.6070 -97.4890 374.00 314.00 60.00 403394 SGP 2016 03 03 20 00 00 3194-99 G co CCGG 138.240 -999.990 ... V4 2016 03 11 13 05 00 36.6070 -97.4890 374.00 314.00 60.00 403395 SGP 2016 03 03 20 00 00 4509-99 G co CCGG 137.460 -999.990 ... V4 2016 03 11 13 21 00 36.6070 -97.4890 374.00 314.00 60.00 403396 SGP 2016 03 10 22 30 00 1933-99 G co CCGG 145.640 -999.990 ... V4 2016 03 30 15 15 00 36.6070 -97.4890 374.00 314.00 60.00 404258 SGP 2016 03 10 22 30 00 3959-99 G co CCGG 145.210 -999.990 ... V4 2016 03 30 14 59 00 36.6070 -97.4890 374.00 314.00 60.00 404259 SGP 2016 03 17 19 00 00 1371-99 G co CCGG 147.300 -999.990 ... V4 2016 03 30 14 27 00 36.6070 -97.4890 374.00 314.00 60.00 404256 SGP 2016 03 17 19 00 00 1547-99 G co CCGG 146.580 -999.990 N.. V4 2016 03 30 14 43 00 36.6070 -97.4890 374.00 314.00 60.00 404257 SGP 2016 03 24 19 00 00 3114-99 G co CCGG 144.090 -999.990 ... V4 2016 04 12 13 29 00 36.6070 -97.4890 374.00 314.00 60.00 405094 SGP 2016 03 24 19 00 00 575-99 G co CCGG 143.720 -999.990 ... V4 2016 04 12 13 13 00 36.6070 -97.4890 374.00 314.00 60.00 405093 SGP 2016 03 31 19 00 00 744-99 G co CCGG 135.170 -999.990 ... V4 2016 04 14 13 14 00 36.6070 -97.4890 374.00 314.00 60.00 405121 SGP 2016 04 07 19 10 00 1427-99 G co CCGG 131.910 -999.990 ... V4 2016 04 27 11 56 00 36.6070 -97.4890 374.00 314.00 60.00 405799 SGP 2016 04 07 19 10 00 2757-99 G co CCGG 132.820 -999.990 ... V4 2016 04 27 12 12 00 36.6070 -97.4890 374.00 314.00 60.00 405800 SGP 2016 04 14 19 00 00 1411-99 G co CCGG 150.880 -999.990 ... V4 2016 04 27 12 43 00 36.6070 -97.4890 374.00 314.00 60.00 405801 SGP 2016 04 14 19 00 00 4450-99 G co CCGG 152.340 -999.990 ... V4 2016 04 27 12 27 00 36.6070 -97.4890 374.00 314.00 60.00 405802 SGP 2016 04 21 19 07 00 3338-99 G co CCGG 140.450 -999.990 ... V4 2016 05 10 12 00 00 36.6070 -97.4890 374.00 314.00 60.00 406697 SGP 2016 04 21 19 07 00 915-99 G co CCGG 141.060 -999.990 ... V4 2016 05 10 12 15 00 36.6070 -97.4890 374.00 314.00 60.00 406698 SGP 2016 04 28 19 00 00 2515-99 G co CCGG 141.880 -999.990 ... V4 2016 05 10 12 31 00 36.6070 -97.4890 374.00 314.00 60.00 406699 SGP 2016 04 28 19 00 00 570-99 G co CCGG 140.860 -999.990 ... V4 2016 05 10 12 47 00 36.6070 -97.4890 374.00 314.00 60.00 406700 SGP 2016 05 05 19 10 00 1250-99 G co CCGG 137.460 -999.990 ... V4 2016 05 25 13 44 00 36.6070 -97.4890 374.00 314.00 60.00 407321 SGP 2016 05 05 19 10 00 1997-99 G co CCGG 138.070 -999.990 ... V4 2016 05 25 14 00 00 36.6070 -97.4890 374.00 314.00 60.00 407322 SGP 2016 05 12 19 00 00 1841-99 G co CCGG 146.330 -999.990 ... V4 2016 05 31 11 57 00 36.6070 -97.4890 374.00 314.00 60.00 407401 SGP 2016 05 12 19 00 00 5028-99 G co CCGG 146.330 -999.990 ... V4 2016 05 31 12 13 00 36.6070 -97.4890 374.00 314.00 60.00 407402 SGP 2016 05 19 19 00 00 2622-99 G co CCGG 142.630 -999.990 ... V4 2016 06 03 10 18 00 36.6070 -97.4890 374.00 314.00 60.00 407847 SGP 2016 05 19 19 00 00 992-99 G co CCGG 143.370 -999.990 ... V4 2016 06 03 10 02 00 36.6070 -97.4890 374.00 314.00 60.00 407848 SGP 2016 05 26 19 07 00 3565-99 G co CCGG 140.870 -999.990 ... V4 2016 06 03 09 30 00 36.6070 -97.4890 374.00 314.00 60.00 407849 SGP 2016 05 26 19 07 00 894-99 G co CCGG 142.360 -999.990 ... V4 2016 06 03 09 46 00 36.6070 -97.4890 374.00 314.00 60.00 407850 SGP 2016 06 02 19 00 00 1636-99 G co CCGG 130.520 -999.990 ... V4 2016 06 27 12 03 00 36.6070 -97.4890 374.00 314.00 60.00 409272 SGP 2016 06 02 19 00 00 3162-99 G co CCGG 130.380 -999.990 ... V4 2016 06 27 11 47 00 36.6070 -97.4890 374.00 314.00 60.00 409273 SGP 2016 06 09 19 00 00 3022-99 G co CCGG 167.620 -999.990 ... V4 2016 06 27 12 35 00 36.6070 -97.4890 374.00 314.00 60.00 409274 SGP 2016 06 09 19 00 00 3491-99 G co CCGG 167.210 -999.990 ... V4 2016 06 27 12 20 00 36.6070 -97.4890 374.00 314.00 60.00 409275 SGP 2016 06 16 19 00 00 206-99 G co CCGG 133.360 -999.990 ... V4 2016 07 07 14 48 00 36.6070 -97.4890 374.00 314.00 60.00 409905 SGP 2016 06 16 19 00 00 4766-99 G co CCGG 133.350 -999.990 ... V4 2016 07 07 15 04 00 36.6070 -97.4890 374.00 314.00 60.00 409906 SGP 2016 06 23 19 12 00 99-99 G co CCGG 122.260 -999.990 ... V4 2016 07 26 16 52 00 36.6070 -97.4890 374.00 314.00 60.00 409907 SGP 2016 06 30 19 30 00 2440-99 G co CCGG 127.850 -999.990 ... V4 2016 07 14 11 13 00 36.6070 -97.4890 374.00 314.00 60.00 410254 SGP 2016 06 30 19 30 00 3165-99 G co CCGG 127.010 -999.990 ... V4 2016 07 14 11 29 00 36.6070 -97.4890 374.00 314.00 60.00 410255 SGP 2016 07 07 19 10 00 5219-99 G co CCGG 101.160 -999.990 ... V4 2016 07 14 12 00 00 36.6070 -97.4890 374.00 314.00 60.00 410257 SGP 2016 07 07 19 10 00 599-99 G co CCGG 102.070 -999.990 ... V4 2016 07 14 11 44 00 36.6070 -97.4890 374.00 314.00 60.00 410256 SGP 2016 07 14 19 15 00 3708-99 G co CCGG 107.590 -999.990 ... V4 2016 07 29 11 40 00 36.6070 -97.4890 374.00 314.00 60.00 411225 SGP 2016 07 14 19 15 00 4947-99 G co CCGG 107.940 -999.990 ... V4 2016 07 29 11 56 00 36.6070 -97.4890 374.00 314.00 60.00 411226 SGP 2016 07 21 19 14 00 2491-99 G co CCGG 96.080 -999.990 N.. V4 2016 07 29 12 28 00 36.6070 -97.4890 374.00 314.00 60.00 411227 SGP 2016 07 21 19 14 00 4356-99 G co CCGG 92.270 -999.990 ... V4 2016 07 29 12 12 00 36.6070 -97.4890 374.00 314.00 60.00 411228 SGP 2016 07 28 19 00 00 2907-99 G co CCGG 138.790 -999.990 ... V4 2016 08 18 12 32 00 36.6070 -97.4890 374.00 314.00 60.00 412620 SGP 2016 07 28 19 00 00 5598-99 G co CCGG 138.120 -999.990 ... V4 2016 08 18 12 48 00 36.6070 -97.4890 374.00 314.00 60.00 412621 SGP 2016 08 04 18 24 00 2779-99 G co CCGG 90.970 -999.990 ... V4 2016 08 18 13 04 00 36.6070 -97.4890 374.00 314.00 60.00 412622 SGP 2016 08 04 18 24 00 4761-99 G co CCGG 90.410 -999.990 ... V4 2016 08 18 13 20 00 36.6070 -97.4890 374.00 314.00 60.00 412623 SGP 2016 08 11 19 08 00 5517-99 G co CCGG 107.880 -999.990 ... V4 2016 08 25 14 52 00 36.6070 -97.4890 374.00 314.00 60.00 412831 SGP 2016 08 11 19 08 00 5518-99 G co CCGG 106.890 -999.990 ... V4 2016 08 25 15 08 00 36.6070 -97.4890 374.00 314.00 60.00 412832 SGP 2016 08 18 19 08 00 5725-99 G co CCGG 85.620 -999.990 ... V4 2016 08 25 15 39 00 36.6070 -97.4890 374.00 314.00 60.00 412829 SGP 2016 08 18 19 08 00 5726-99 G co CCGG 85.870 -999.990 ... V4 2016 08 25 15 23 00 36.6070 -97.4890 374.00 314.00 60.00 412830 SGP 2016 08 25 19 56 00 5445-99 G co CCGG 96.590 -999.990 ... V4 2016 09 28 16 35 00 36.6070 -97.4890 374.00 314.00 60.00 414109 SGP 2016 08 25 19 56 00 5663-99 G co CCGG 96.740 -999.990 ... V4 2016 09 28 16 50 00 36.6070 -97.4890 374.00 314.00 60.00 414110 SGP 2016 09 02 19 11 00 3128-99 G co CCGG 130.430 -999.990 ... V4 2016 09 28 17 06 00 36.6070 -97.4890 374.00 314.00 60.00 414107 SGP 2016 09 02 19 11 00 4142-99 G co CCGG 130.640 -999.990 ... V4 2016 09 28 17 22 00 36.6070 -97.4890 374.00 314.00 60.00 414108 SGP 2016 09 08 19 38 00 2354-99 G co CCGG 101.810 -999.990 ... V4 2016 10 05 11 57 00 36.6070 -97.4890 374.00 314.00 60.00 414521 SGP 2016 09 08 19 38 00 5264-99 G co CCGG 100.480 -999.990 ... V4 2016 10 05 12 13 00 36.6070 -97.4890 374.00 314.00 60.00 414522 SGP 2016 09 15 19 00 00 1961-99 G co CCGG 109.710 -999.990 ... V4 2016 10 05 12 31 00 36.6070 -97.4890 374.00 314.00 60.00 414517 SGP 2016 09 15 19 00 00 2725-99 G co CCGG 109.210 -999.990 ... V4 2016 10 05 12 47 00 36.6070 -97.4890 374.00 314.00 60.00 414518 SGP 2016 09 22 19 00 00 1408-99 G co CCGG 129.300 -999.990 ... V4 2016 10 13 14 48 00 36.6070 -97.4890 374.00 314.00 60.00 415006 SGP 2016 09 22 19 00 00 4576-99 G co CCGG 129.720 -999.990 ... V4 2016 10 13 15 04 00 36.6070 -97.4890 374.00 314.00 60.00 415007 SGP 2016 09 29 19 00 00 4841-99 G co CCGG 103.410 -999.990 ... V4 2016 10 13 15 36 00 36.6070 -97.4890 374.00 314.00 60.00 415009 SGP 2016 09 29 19 00 00 826-99 G co CCGG 103.210 -999.990 ... V4 2016 10 13 15 20 00 36.6070 -97.4890 374.00 314.00 60.00 415008 SGP 2016 10 06 19 00 00 4682-99 G co CCGG 96.770 -999.990 ... V4 2016 10 31 17 25 00 36.6070 -97.4890 374.00 314.00 60.00 415715 SGP 2016 10 06 19 00 00 519-99 G co CCGG 97.970 -999.990 ... V4 2016 10 31 17 10 00 36.6070 -97.4890 374.00 314.00 60.00 415714 SGP 2016 10 13 19 00 00 2136-99 G co CCGG 112.440 -999.990 ... V4 2016 10 31 16 38 00 36.6070 -97.4890 374.00 314.00 60.00 415712 SGP 2016 10 13 19 00 00 5265-99 G co CCGG 112.130 -999.990 ... V4 2016 10 31 16 54 00 36.6070 -97.4890 374.00 314.00 60.00 415713 SGP 2016 10 20 19 25 00 1662-99 G co CCGG 115.470 -999.990 ... V4 2016 11 10 16 42 00 36.6070 -97.4890 374.00 314.00 60.00 416407 SGP 2016 10 20 19 25 00 2154-99 G co CCGG 114.600 -999.990 ... V4 2016 11 10 16 58 00 36.6070 -97.4890 374.00 314.00 60.00 416408 SGP 2016 10 27 19 24 00 4840-99 G co CCGG 130.740 -999.990 ... V4 2016 11 14 10 11 00 36.6070 -97.4890 374.00 314.00 60.00 416406 SGP 2016 10 27 19 24 00 591-99 G co CCGG 130.950 -999.990 ... V4 2016 11 14 09 55 00 36.6070 -97.4890 374.00 314.00 60.00 416405 SGP 2016 11 03 20 00 00 2955-99 G co CCGG 119.560 -999.990 ... V4 2016 11 21 15 14 00 36.6070 -97.4890 374.00 314.00 60.00 417084 SGP 2016 11 03 20 00 00 361-99 G co CCGG 117.560 -999.990 ... V4 2016 11 21 14 58 00 36.6070 -97.4890 374.00 314.00 60.00 417083 SGP 2016 11 10 20 01 00 1032-99 G co CCGG 127.680 -999.990 ... V4 2016 11 21 15 30 00 36.6070 -97.4890 374.00 314.00 60.00 417085 SGP 2016 11 10 20 01 00 2574-99 G co CCGG 127.940 -999.990 ... V4 2016 11 21 15 46 00 36.6070 -97.4890 374.00 314.00 60.00 417086 SGP 2016 11 16 22 37 00 2796-99 G co CCGG 148.600 -999.990 ... V4 2016 12 08 12 19 00 36.6070 -97.4890 374.00 314.00 60.00 417677 SGP 2016 11 16 22 37 00 4319-99 G co CCGG 145.940 -999.990 ... V4 2016 12 08 12 35 00 36.6070 -97.4890 374.00 314.00 60.00 417678 SGP 2016 11 23 20 00 00 1574-99 G co CCGG 123.760 -999.990 ... V4 2016 12 08 12 50 00 36.6070 -97.4890 374.00 314.00 60.00 417679 SGP 2016 11 23 20 00 00 5526-99 G co CCGG 124.440 -999.990 ... V4 2016 12 08 13 06 00 36.6070 -97.4890 374.00 314.00 60.00 417680 SGP 2016 12 01 20 00 00 5493-99 G co CCGG 136.820 -999.990 ... V4 2016 12 28 08 01 00 36.6070 -97.4890 374.00 314.00 60.00 418473 SGP 2016 12 01 20 00 00 5571-99 G co CCGG 137.430 -999.990 ... V4 2016 12 28 08 17 00 36.6070 -97.4890 374.00 314.00 60.00 418474 SGP 2016 12 08 20 00 00 5496-99 G co CCGG 125.310 -999.990 ... V4 2016 12 28 08 33 00 36.6070 -97.4890 374.00 314.00 60.00 418475 SGP 2016 12 08 20 00 00 5567-99 G co CCGG 124.710 -999.990 ... V4 2016 12 28 08 49 00 36.6070 -97.4890 374.00 314.00 60.00 418476 SGP 2016 12 15 20 00 00 1338-99 G co CCGG 153.250 -999.990 ... V4 2017 01 17 12 46 00 36.6070 -97.4890 374.00 314.00 60.00 419045 SGP 2016 12 15 20 00 00 4990-99 G co CCGG 153.490 -999.990 ... V4 2017 01 17 13 02 00 36.6070 -97.4890 374.00 314.00 60.00 419046 SGP 2016 12 22 20 00 00 2311-99 G co CCGG 136.890 -999.990 ... V4 2017 01 17 13 18 00 36.6070 -97.4890 374.00 314.00 60.00 419043 SGP 2016 12 22 20 00 00 4006-99 G co CCGG 136.590 -999.990 ... V4 2017 01 17 13 34 00 36.6070 -97.4890 374.00 314.00 60.00 419044 SGP 2016 12 29 20 00 00 1811-99 G co CCGG 121.940 -999.990 ... V4 2017 01 19 10 33 00 36.6070 -97.4890 374.00 314.00 60.00 419382 SGP 2016 12 29 20 00 00 5596-99 G co CCGG 121.530 -999.990 ... V4 2017 01 19 10 48 00 36.6070 -97.4890 374.00 314.00 60.00 419383 SGP 2017 01 05 20 00 00 1785-99 G co CCGG 130.990 -999.990 ... V4 2017 01 19 11 04 00 36.6070 -97.4890 374.00 314.00 60.00 419384 SGP 2017 01 05 20 00 00 5460-99 G co CCGG 130.210 -999.990 ... V4 2017 01 19 11 20 00 36.6070 -97.4890 374.00 314.00 60.00 419385 SGP 2017 01 12 20 00 00 3250-99 G co CCGG 150.990 -999.990 ... V4 2017 02 09 11 09 00 36.6070 -97.4890 374.00 314.00 60.00 420167 SGP 2017 01 12 20 00 00 5065-99 G co CCGG 151.460 -999.990 ... V4 2017 02 09 11 25 00 36.6070 -97.4890 374.00 314.00 60.00 420168 SGP 2017 01 19 20 00 00 3319-99 G co CCGG 130.840 -999.990 ... V4 2017 02 09 11 41 00 36.6070 -97.4890 374.00 314.00 60.00 420165 SGP 2017 01 19 20 00 00 5320-99 G co CCGG 129.460 -999.990 ... V4 2017 02 09 11 57 00 36.6070 -97.4890 374.00 314.00 60.00 420166 SGP 2017 01 26 20 00 00 2078-99 G co CCGG 128.140 -999.990 ... V4 2017 02 15 12 26 00 36.6070 -97.4890 374.00 314.00 60.00 420669 SGP 2017 01 26 20 00 00 2407-99 G co CCGG 127.650 -999.990 ... V4 2017 02 15 12 41 00 36.6070 -97.4890 374.00 314.00 60.00 420670 SGP 2017 02 02 20 00 00 2250-99 G co CCGG 130.550 -999.990 ... V4 2017 02 15 12 57 00 36.6070 -97.4890 374.00 314.00 60.00 420667 SGP 2017 02 02 20 00 00 3610-99 G co CCGG 130.760 -999.990 ... V4 2017 02 15 13 13 00 36.6070 -97.4890 374.00 314.00 60.00 420668 SGP 2017 02 09 20 00 00 2323-99 G co CCGG 141.370 -999.990 ... V4 2017 03 03 12 55 00 36.6070 -97.4890 374.00 314.00 60.00 421612 SGP 2017 02 09 20 00 00 5001-99 G co CCGG 139.150 -999.990 ... V4 2017 03 03 13 11 00 36.6070 -97.4890 374.00 314.00 60.00 421613 SGP 2017 02 16 20 00 00 5266-99 G co CCGG 139.150 -999.990 ... V4 2017 03 03 12 39 00 36.6070 -97.4890 374.00 314.00 60.00 421611 SGP 2017 02 16 20 00 00 630-99 G co CCGG 139.310 -999.990 ... V4 2017 03 03 12 23 00 36.6070 -97.4890 374.00 314.00 60.00 421610 SGP 2017 02 23 20 00 00 3558-99 G co CCGG 135.980 -999.990 ... V4 2017 03 21 13 56 00 36.6070 -97.4890 374.00 314.00 60.00 422440 SGP 2017 02 23 20 00 00 4407-99 G co CCGG 135.800 -999.990 ... V4 2017 03 21 14 11 00 36.6070 -97.4890 374.00 314.00 60.00 422441 SGP 2017 03 02 20 00 00 4977-99 G co CCGG 133.170 -999.990 ... V4 2017 03 21 11 49 00 36.6070 -97.4890 374.00 314.00 60.00 422438 SGP 2017 03 02 20 00 00 5373-99 G co CCGG 132.770 -999.990 ... V4 2017 03 21 12 05 00 36.6070 -97.4890 374.00 314.00 60.00 422439 SGP 2017 03 09 20 00 00 5222-99 G co CCGG 141.230 -999.990 ... V2 2018 01 26 15 27 00 36.6070 -97.4890 374.00 314.00 60.00 437364 SGP 2017 03 09 20 00 00 5329-99 G co CCGG 141.450 -999.990 ... V2 2018 01 26 15 43 00 36.6070 -97.4890 374.00 314.00 60.00 437365 SGP 2017 03 16 19 00 00 1044-99 G co CCGG 165.660 -999.990 ... V4 2017 04 05 12 14 00 36.6070 -97.4890 374.00 314.00 60.00 423144 SGP 2017 03 16 19 00 00 5410-99 G co CCGG 165.920 -999.990 ... V4 2017 04 05 12 30 00 36.6070 -97.4890 374.00 314.00 60.00 423145 SGP 2017 03 16 19 15 00 3619-99 G co CCGG 156.340 -999.990 ... V4 2017 04 05 12 45 00 36.6070 -97.4890 374.00 314.00 60.00 423142 SGP 2017 03 16 19 15 00 5308-99 G co CCGG 155.530 -999.990 ... V4 2017 04 05 13 01 00 36.6070 -97.4890 374.00 314.00 60.00 423143 SGP 2017 03 23 19 00 00 2010-99 G co CCGG 149.330 -999.990 ... V4 2017 04 11 11 03 00 36.6070 -97.4890 374.00 314.00 60.00 423393 SGP 2017 03 23 19 00 00 3745-99 G co CCGG 150.470 -999.990 ... V4 2017 04 11 11 19 00 36.6070 -97.4890 374.00 314.00 60.00 423394 SGP 2017 03 23 19 15 00 3169-99 G co CCGG 149.190 -999.990 ... V4 2017 04 11 11 35 00 36.6070 -97.4890 374.00 314.00 60.00 423395 SGP 2017 03 23 19 15 00 3984-99 G co CCGG 147.810 -999.990 ... V4 2017 04 11 11 51 00 36.6070 -97.4890 374.00 314.00 60.00 423396 SGP 2017 03 30 19 05 00 2568-99 G co CCGG 149.340 -999.990 ... V4 2017 04 13 17 06 00 36.6070 -97.4890 374.00 314.00 60.00 423887 SGP 2017 03 30 19 05 00 4319-99 G co CCGG 149.830 -999.990 ... V4 2017 04 13 17 22 00 36.6070 -97.4890 374.00 314.00 60.00 423888 SGP 2017 03 30 19 18 00 2796-99 G co CCGG 148.320 -999.990 ... V4 2017 04 13 16 35 00 36.6070 -97.4890 374.00 314.00 60.00 423886 SGP 2017 03 30 19 18 00 3601-99 G co CCGG 149.500 -999.990 ... V4 2017 04 13 16 51 00 36.6070 -97.4890 374.00 314.00 60.00 423885 SGP 2017 04 06 19 00 00 3786-99 G co CCGG 146.610 -999.990 ... V4 2017 04 20 16 31 00 36.6070 -97.4890 374.00 314.00 60.00 424068 SGP 2017 04 06 19 00 00 4147-99 G co CCGG 144.550 -999.990 ... V4 2017 04 20 16 47 00 36.6070 -97.4890 374.00 314.00 60.00 424069 SGP 2017 04 06 19 15 00 3950-99 G co CCGG 145.550 -999.990 ... V4 2017 04 21 10 32 00 36.6070 -97.4890 374.00 314.00 60.00 424066 SGP 2017 04 06 19 15 00 4332-99 G co CCGG 147.390 -999.990 ... V4 2017 04 21 10 48 00 36.6070 -97.4890 374.00 314.00 60.00 424067 SGP 2017 04 13 19 00 00 1284-99 G co CCGG 157.220 -999.990 ... V4 2017 05 01 14 09 00 36.6070 -97.4890 374.00 314.00 60.00 424440 SGP 2017 04 13 19 00 00 3818-99 G co CCGG 156.410 -999.990 ... V4 2017 05 01 14 24 00 36.6070 -97.4890 374.00 314.00 60.00 424441 SGP 2017 04 13 19 15 00 3997-99 G co CCGG 154.720 -999.990 ... V4 2017 05 01 14 40 00 36.6070 -97.4890 374.00 314.00 60.00 424438 SGP 2017 04 13 19 15 00 4753-99 G co CCGG 155.600 -999.990 ... V4 2017 05 01 14 56 00 36.6070 -97.4890 374.00 314.00 60.00 424439 SGP 2017 04 20 19 00 00 2957-99 G co CCGG 136.500 -999.990 ... V4 2017 05 03 15 30 00 36.6070 -97.4890 374.00 314.00 60.00 424581 SGP 2017 04 20 19 00 00 3793-99 G co CCGG 135.620 -999.990 ... V4 2017 05 03 15 45 00 36.6070 -97.4890 374.00 314.00 60.00 424582 SGP 2017 04 20 19 13 00 1354-99 G co CCGG 135.180 -999.990 ... V4 2017 05 03 16 01 00 36.6070 -97.4890 374.00 314.00 60.00 424579 SGP 2017 04 20 19 13 00 4302-99 G co CCGG 136.030 -999.990 ... V4 2017 05 03 16 17 00 36.6070 -97.4890 374.00 314.00 60.00 424580 SGP 2017 04 27 19 00 00 1013-99 G co CCGG 133.800 -999.990 ... V4 2017 05 10 14 58 00 36.6070 -97.4890 374.00 314.00 60.00 424799 SGP 2017 04 27 19 00 00 3549-99 G co CCGG 134.320 -999.990 ... V4 2017 05 10 15 14 00 36.6070 -97.4890 374.00 314.00 60.00 424800 SGP 2017 04 27 19 15 00 2354-99 G co CCGG 132.850 -999.990 ... V4 2017 05 12 12 59 00 36.6070 -97.4890 374.00 314.00 60.00 424985 SGP 2017 04 27 19 15 00 3337-99 G co CCGG 132.940 -999.990 ... V4 2017 05 12 13 15 00 36.6070 -97.4890 374.00 314.00 60.00 424986 SGP 2017 05 04 19 00 00 5197-99 G co CCGG 127.480 -999.990 ... V4 2017 05 17 10 10 00 36.6070 -97.4890 374.00 314.00 60.00 425228 SGP 2017 05 04 19 00 00 528-99 G co CCGG 126.440 -999.990 ... V4 2017 05 17 09 54 00 36.6070 -97.4890 374.00 314.00 60.00 425227 SGP 2017 05 04 19 15 00 5072-99 G co CCGG 127.980 -999.990 ... V4 2017 05 17 10 42 00 36.6070 -97.4890 374.00 314.00 60.00 425229 SGP 2017 05 04 19 15 00 738-99 G co CCGG 128.340 -999.990 ... V4 2017 05 17 10 26 00 36.6070 -97.4890 374.00 314.00 60.00 425230 SGP 2017 05 12 19 00 00 1577-99 G co CCGG 120.190 -999.990 ... V2 2017 06 01 14 23 00 36.6070 -97.4890 374.00 314.00 60.00 425819 SGP 2017 05 12 19 00 00 5698-99 G co CCGG 118.670 -999.990 ... V2 2017 06 01 14 39 00 36.6070 -97.4890 374.00 314.00 60.00 425820 SGP 2017 05 12 19 15 00 1236-99 G co CCGG 119.270 -999.990 ... V2 2017 06 01 14 55 00 36.6070 -97.4890 374.00 314.00 60.00 425821 SGP 2017 05 12 19 15 00 2621-99 G co CCGG 118.740 -999.990 ... V2 2017 06 01 15 11 00 36.6070 -97.4890 374.00 314.00 60.00 425822 SGP 2017 05 18 19 00 00 217-99 G co CCGG 145.240 -999.990 ... V2 2017 06 09 12 49 00 36.6070 -97.4890 374.00 314.00 60.00 426240 SGP 2017 05 18 19 00 00 2990-99 G co CCGG 144.240 -999.990 ... V2 2017 06 09 13 05 00 36.6070 -97.4890 374.00 314.00 60.00 426241 SGP 2017 05 18 19 15 00 4064-99 G co CCGG 144.320 -999.990 ... V2 2017 06 13 12 45 00 36.6070 -97.4890 374.00 314.00 60.00 426375 SGP 2017 05 18 19 15 00 72-99 G co CCGG 143.860 -999.990 ... V2 2017 06 13 12 29 00 36.6070 -97.4890 374.00 314.00 60.00 426374 SGP 2017 05 25 19 00 00 4331-99 G co CCGG 134.020 -999.990 ... V2 2017 06 12 17 13 00 36.6070 -97.4890 374.00 314.00 60.00 426393 SGP 2017 05 25 19 00 00 714-99 G co CCGG 133.840 -999.990 ... V2 2017 06 12 16 57 00 36.6070 -97.4890 374.00 314.00 60.00 426392 SGP 2017 05 25 19 15 00 4908-99 G co CCGG 132.180 -999.990 ... V2 2017 06 12 16 26 00 36.6070 -97.4890 374.00 314.00 60.00 426390 SGP 2017 05 25 19 15 00 5043-99 G co CCGG 133.260 -999.990 ... V2 2017 06 12 16 41 00 36.6070 -97.4890 374.00 314.00 60.00 426391 SGP 2017 06 01 19 00 00 4324-99 G co CCGG 120.590 -999.990 ... V2 2017 06 14 11 12 00 36.6070 -97.4890 374.00 314.00 60.00 426527 SGP 2017 06 01 19 00 00 4696-99 G co CCGG 120.770 -999.990 ... V2 2017 06 14 11 28 00 36.6070 -97.4890 374.00 314.00 60.00 426528 SGP 2017 06 01 19 15 00 3637-99 G co CCGG 119.550 -999.990 ... V2 2017 06 15 11 46 00 36.6070 -97.4890 374.00 314.00 60.00 426593 SGP 2017 06 01 19 15 00 4720-99 G co CCGG 120.070 -999.990 ... V2 2017 06 15 12 01 00 36.6070 -97.4890 374.00 314.00 60.00 426594 SGP 2017 06 08 19 00 00 3007-99 G co CCGG 126.930 -999.990 ... V2 2017 06 21 15 42 00 36.6070 -97.4890 374.00 314.00 60.00 426908 SGP 2017 06 08 19 00 00 3888-99 G co CCGG 126.940 -999.990 ... V2 2017 06 21 15 58 00 36.6070 -97.4890 374.00 314.00 60.00 426909 SGP 2017 06 08 19 15 00 2343-99 G co CCGG 128.080 -999.990 ... V2 2017 06 21 17 01 00 36.6070 -97.4890 374.00 314.00 60.00 426907 SGP 2017 06 08 19 15 00 562-99 G co CCGG 128.330 -999.990 ... V2 2017 06 21 16 45 00 36.6070 -97.4890 374.00 314.00 60.00 426906 SGP 2017 06 15 19 00 00 1408-99 G co CCGG 131.900 -999.990 ... V2 2017 06 29 11 50 00 36.6070 -97.4890 374.00 314.00 60.00 427257 SGP 2017 06 15 19 00 00 4482-99 G co CCGG 131.610 -999.990 ... V2 2017 06 29 12 06 00 36.6070 -97.4890 374.00 314.00 60.00 427258 SGP 2017 06 15 19 15 00 1254-99 G co CCGG 127.390 -999.990 ... V2 2017 06 29 11 18 00 36.6070 -97.4890 374.00 314.00 60.00 427259 SGP 2017 06 15 19 15 00 3214-99 G co CCGG 127.380 -999.990 ... V2 2017 06 29 11 34 00 36.6070 -97.4890 374.00 314.00 60.00 427260 SGP 2017 06 22 19 00 00 4568-99 G co CCGG 125.570 -999.990 ... V2 2017 07 13 15 04 00 36.6070 -97.4890 374.00 314.00 60.00 427569 SGP 2017 06 22 19 00 00 4845-99 G co CCGG 125.150 -999.990 ... V2 2017 07 13 15 20 00 36.6070 -97.4890 374.00 314.00 60.00 427570 SGP 2017 06 22 19 15 00 3939-99 G co CCGG 126.580 -999.990 ... V2 2017 07 13 14 17 00 36.6070 -97.4890 374.00 314.00 60.00 427571 SGP 2017 06 22 19 15 00 500-99 G co CCGG 126.530 -999.990 ... V2 2017 07 13 14 01 00 36.6070 -97.4890 374.00 314.00 60.00 427572 SGP 2017 06 29 19 00 00 2340-99 G co CCGG 113.360 -999.990 ... V2 2017 07 19 11 54 00 36.6070 -97.4890 374.00 314.00 60.00 427809 SGP 2017 06 29 19 00 00 3268-99 G co CCGG 113.030 -999.990 ... V2 2017 07 19 12 10 00 36.6070 -97.4890 374.00 314.00 60.00 427810 SGP 2017 06 29 19 15 00 4799-99 G co CCGG 113.910 -999.990 ... V2 2017 07 19 12 26 00 36.6070 -97.4890 374.00 314.00 60.00 427808 SGP 2017 06 29 19 15 00 4939-99 G co CCGG 113.860 -999.990 ... V2 2017 07 19 12 42 00 36.6070 -97.4890 374.00 314.00 60.00 427807 SGP 2017 07 06 19 00 00 3935-99 G co CCGG 114.130 -999.990 ... V2 2017 07 24 16 09 00 36.6070 -97.4890 374.00 314.00 60.00 428176 SGP 2017 07 06 19 00 00 4590-99 G co CCGG 113.080 -999.990 ... V2 2017 07 24 16 25 00 36.6070 -97.4890 374.00 314.00 60.00 428177 SGP 2017 07 06 19 15 00 1206-99 G co CCGG 112.980 -999.990 ... V2 2017 07 24 15 37 00 36.6070 -97.4890 374.00 314.00 60.00 428174 SGP 2017 07 06 19 15 00 1283-99 G co CCGG 114.240 -999.990 ... V2 2017 07 24 15 53 00 36.6070 -97.4890 374.00 314.00 60.00 428175 SGP 2017 07 13 19 00 00 2767-99 G co CCGG 87.760 -999.990 ... V2 2017 07 28 13 45 00 36.6070 -97.4890 374.00 314.00 60.00 428455 SGP 2017 07 13 19 00 00 2961-99 G co CCGG 87.910 -999.990 ... V2 2017 07 28 14 01 00 36.6070 -97.4890 374.00 314.00 60.00 428456 SGP 2017 07 13 19 15 00 4488-99 G co CCGG 83.060 -999.990 ... V2 2017 07 28 14 33 00 36.6070 -97.4890 374.00 314.00 60.00 428457 SGP 2017 07 13 19 15 00 782-99 G co CCGG 84.110 -999.990 ... V2 2017 07 28 14 17 00 36.6070 -97.4890 374.00 314.00 60.00 428458 SGP 2017 07 20 19 00 00 425-99 G co CCGG 91.830 -999.990 ... V2 2017 08 07 09 54 00 36.6070 -97.4890 374.00 314.00 60.00 428766 SGP 2017 07 20 19 00 00 5572-99 G co CCGG 92.030 -999.990 ... V2 2017 08 07 10 10 00 36.6070 -97.4890 374.00 314.00 60.00 428767 SGP 2017 07 20 19 15 00 4831-99 G co CCGG 92.230 -999.990 ... V2 2017 08 07 10 42 00 36.6070 -97.4890 374.00 314.00 60.00 428769 SGP 2017 07 20 19 15 00 813-99 G co CCGG 92.050 -999.990 ... V2 2017 08 07 10 26 00 36.6070 -97.4890 374.00 314.00 60.00 428768 SGP 2017 07 27 19 00 00 1133-99 G co CCGG 132.740 -999.990 ... V2 2017 08 11 16 44 00 36.6070 -97.4890 374.00 314.00 60.00 429274 SGP 2017 07 27 19 00 00 3005-99 G co CCGG 132.350 -999.990 ... V2 2017 08 11 17 00 00 36.6070 -97.4890 374.00 314.00 60.00 429275 SGP 2017 07 27 19 15 00 323-99 G co CCGG 127.560 -999.990 ... V2 2017 08 14 12 46 00 36.6070 -97.4890 374.00 314.00 60.00 429276 SGP 2017 07 27 19 15 00 4542-99 G co CCGG 127.520 -999.990 ... V2 2017 08 14 13 02 00 36.6070 -97.4890 374.00 314.00 60.00 429277 SGP 2017 08 03 19 00 00 4124-99 G co CCGG 144.070 -999.990 ... V2 2017 08 23 16 18 00 36.6070 -97.4890 374.00 314.00 60.00 429390 SGP 2017 08 03 19 15 00 1700-99 G co CCGG 142.430 -999.990 ... V2 2017 08 21 11 35 00 36.6070 -97.4890 374.00 314.00 60.00 429391 SGP 2017 08 03 19 15 00 5224-99 G co CCGG 142.870 -999.990 ... V2 2017 08 21 11 51 00 36.6070 -97.4890 374.00 314.00 60.00 429392 SGP 2017 08 10 19 00 00 358-99 G co CCGG 161.490 -999.990 ... V2 2017 09 01 09 34 00 36.6070 -97.4890 374.00 314.00 60.00 429984 SGP 2017 08 10 19 00 00 4606-99 G co CCGG 158.920 -999.990 ... V2 2017 09 01 09 50 00 36.6070 -97.4890 374.00 314.00 60.00 429985 SGP 2017 08 10 19 15 00 2880-99 G co CCGG 158.040 -999.990 ... V2 2017 09 01 10 06 00 36.6070 -97.4890 374.00 314.00 60.00 429986 SGP 2017 08 10 19 15 00 3708-99 G co CCGG 157.960 -999.990 ... V2 2017 09 01 10 22 00 36.6070 -97.4890 374.00 314.00 60.00 429987 SGP 2017 08 17 19 00 00 2646-99 G co CCGG 129.390 -999.990 ... V2 2017 09 01 14 21 00 36.6070 -97.4890 374.00 314.00 60.00 430103 SGP 2017 08 17 19 00 00 671-99 G co CCGG 128.510 -999.990 ... V2 2017 09 01 14 05 00 36.6070 -97.4890 374.00 314.00 60.00 430102 SGP 2017 08 17 19 15 00 1658-99 G co CCGG 128.060 -999.990 ... V2 2017 09 01 14 36 00 36.6070 -97.4890 374.00 314.00 60.00 430106 SGP 2017 08 17 19 15 00 2112-99 G co CCGG 128.530 -999.990 ... V2 2017 09 01 14 52 00 36.6070 -97.4890 374.00 314.00 60.00 430107 SGP 2017 08 24 19 00 00 2354-99 G co CCGG 151.210 -999.990 ... V2 2017 09 14 11 02 00 36.6070 -97.4890 374.00 314.00 60.00 430582 SGP 2017 08 24 19 00 00 3337-99 G co CCGG 152.230 -999.990 ... V2 2017 09 14 11 18 00 36.6070 -97.4890 374.00 314.00 60.00 430581 SGP 2017 08 24 19 15 00 192-99 G co CCGG 146.060 -999.990 ... V2 2017 09 14 10 30 00 36.6070 -97.4890 374.00 314.00 60.00 430583 SGP 2017 08 24 19 15 00 3119-99 G co CCGG 148.150 -999.990 ... V2 2017 09 14 10 46 00 36.6070 -97.4890 374.00 314.00 60.00 430584 SGP 2017 08 31 19 00 00 1325-99 G co CCGG 136.640 -999.990 ... V2 2017 09 15 11 17 00 36.6070 -97.4890 374.00 314.00 60.00 430667 SGP 2017 08 31 19 00 00 4983-99 G co CCGG 136.980 -999.990 ... V2 2017 09 15 11 33 00 36.6070 -97.4890 374.00 314.00 60.00 430668 SGP 2017 08 31 19 13 00 1309-99 G co CCGG 134.690 -999.990 ... V2 2017 09 18 11 31 00 36.6070 -97.4890 374.00 314.00 60.00 430792 SGP 2017 08 31 19 13 00 4400-99 G co CCGG 133.610 -999.990 ... V2 2017 09 18 11 47 00 36.6070 -97.4890 374.00 314.00 60.00 430793 SGP 2017 09 07 19 00 00 2407-99 G co CCGG 143.270 -999.990 ... V2 2017 09 26 09 04 00 36.6070 -97.4890 374.00 314.00 60.00 431249 SGP 2017 09 07 19 00 00 460-99 G co CCGG 143.580 -999.990 ... V2 2017 09 26 08 48 00 36.6070 -97.4890 374.00 314.00 60.00 431248 SGP 2017 09 07 19 15 00 2679-99 G co CCGG 142.730 -999.990 ... V2 2017 09 26 10 55 00 36.6070 -97.4890 374.00 314.00 60.00 431250 SGP 2017 09 07 19 15 00 4100-99 G co CCGG 143.310 -999.990 ... V2 2017 09 26 11 11 00 36.6070 -97.4890 374.00 314.00 60.00 431251 SGP 2017 09 14 19 00 00 4922-99 G co CCGG 182.770 -999.990 ... V2 2017 09 29 16 06 00 36.6070 -97.4890 374.00 314.00 60.00 431333 SGP 2017 09 14 19 00 00 574-99 G co CCGG 183.350 -999.990 ... V2 2017 09 29 15 50 00 36.6070 -97.4890 374.00 314.00 60.00 431332 SGP 2017 09 14 19 15 00 1080-99 G co CCGG 187.450 -999.990 .X. V2 2017 09 29 16 22 00 36.6070 -97.4890 374.00 314.00 60.00 431334 SGP 2017 09 14 19 15 00 4095-99 G co CCGG 186.420 -999.990 .X. V2 2017 09 29 16 37 00 36.6070 -97.4890 374.00 314.00 60.00 431335 SGP 2017 09 21 19 00 00 2161-99 G co CCGG 130.790 -999.990 ... V2 2017 10 05 16 09 00 36.6070 -97.4890 374.00 314.00 60.00 431746 SGP 2017 09 21 19 00 00 610-99 G co CCGG 131.320 -999.990 ... V2 2017 10 05 15 53 00 36.6070 -97.4890 374.00 314.00 60.00 431747 SGP 2017 09 21 19 15 00 554-99 G co CCGG 132.640 -999.990 ... V2 2017 10 05 14 49 00 36.6070 -97.4890 374.00 314.00 60.00 431744 SGP 2017 09 21 19 15 00 611-99 G co CCGG 133.030 -999.990 ... V2 2017 10 05 15 05 00 36.6070 -97.4890 374.00 314.00 60.00 431745 SGP 2017 09 28 19 00 00 140-99 G co CCGG 122.340 -999.990 ... V2 2017 10 12 11 56 00 36.6070 -97.4890 374.00 314.00 60.00 431976 SGP 2017 09 28 19 00 00 277-99 G co CCGG 121.320 -999.990 ... V2 2017 10 12 12 12 00 36.6070 -97.4890 374.00 314.00 60.00 431977 SGP 2017 09 28 19 15 00 4869-99 G co CCGG 120.600 -999.990 ... V2 2017 10 12 12 44 00 36.6070 -97.4890 374.00 314.00 60.00 431978 SGP 2017 09 28 19 15 00 835-99 G co CCGG 131.770 -999.990 N.. V2 2017 10 12 12 28 00 36.6070 -97.4890 374.00 314.00 60.00 431979 SGP 2017 10 06 19 00 00 1640-99 G co CCGG 134.620 -999.990 ... V2 2017 10 18 15 26 00 36.6070 -97.4890 374.00 314.00 60.00 432587 SGP 2017 10 06 19 00 00 3526-99 G co CCGG 134.240 -999.990 ... V2 2017 10 18 15 42 00 36.6070 -97.4890 374.00 314.00 60.00 432588 SGP 2017 10 06 19 14 00 4683-99 G co CCGG 139.070 -999.990 ... V2 2017 10 18 16 00 00 36.6070 -97.4890 374.00 314.00 60.00 432585 SGP 2017 10 06 19 14 00 5153-99 G co CCGG 139.730 -999.990 ... V2 2017 10 18 16 16 00 36.6070 -97.4890 374.00 314.00 60.00 432586 SGP 2017 10 12 19 00 00 446-99 G co CCGG 135.970 -999.990 N.. V2 2017 10 23 10 44 00 36.6070 -97.4890 374.00 314.00 60.00 432703 SGP 2017 10 12 19 00 00 5450-99 G co CCGG 135.540 -999.990 ... V2 2017 10 23 10 59 00 36.6070 -97.4890 374.00 314.00 60.00 432704 SGP 2017 10 12 19 13 00 1828-99 G co CCGG 135.900 -999.990 ... V2 2017 10 23 10 28 00 36.6070 -97.4890 374.00 314.00 60.00 432705 SGP 2017 10 12 19 13 00 829-99 G co CCGG 136.580 -999.990 ... V2 2017 10 23 10 12 00 36.6070 -97.4890 374.00 314.00 60.00 432706 SGP 2017 10 19 19 00 00 1965-99 G co CCGG 144.190 -999.990 ... V2 2017 11 02 14 11 00 36.6070 -97.4890 374.00 314.00 60.00 433327 SGP 2017 10 19 19 00 00 3051-99 G co CCGG 144.290 -999.990 ... V2 2017 11 02 14 27 00 36.6070 -97.4890 374.00 314.00 60.00 433328 SGP 2017 10 19 19 13 00 4299-99 G co CCGG 142.260 -999.990 ... V2 2017 11 01 10 08 00 36.6070 -97.4890 374.00 314.00 60.00 433120 SGP 2017 10 19 19 13 00 681-99 G co CCGG 142.200 -999.990 ... V2 2017 11 01 09 52 00 36.6070 -97.4890 374.00 314.00 60.00 433121 SGP 2017 10 26 19 00 00 2354-99 G co CCGG 121.800 -999.990 ... V2 2017 11 13 14 25 00 36.6070 -97.4890 374.00 314.00 60.00 433923 SGP 2017 10 26 19 00 00 3227-99 G co CCGG 121.470 -999.990 ... V2 2017 11 13 14 41 00 36.6070 -97.4890 374.00 314.00 60.00 433924 SGP 2017 10 26 19 15 00 3246-99 G co CCGG 118.900 -999.990 ... V2 2017 11 13 14 57 00 36.6070 -97.4890 374.00 314.00 60.00 433921 SGP 2017 10 26 19 15 00 4522-99 G co CCGG 119.200 -999.990 ... V2 2017 11 13 15 13 00 36.6070 -97.4890 374.00 314.00 60.00 433922 SGP 2017 11 02 19 00 00 2798-99 G co CCGG 145.670 -999.990 ... V2 2017 11 17 11 34 00 36.6070 -97.4890 374.00 314.00 60.00 434023 SGP 2017 11 02 19 00 00 4709-99 G co CCGG 144.620 -999.990 ... V2 2017 11 17 11 50 00 36.6070 -97.4890 374.00 314.00 60.00 434024 SGP 2017 11 02 19 13 00 1496-99 G co CCGG 140.820 -999.990 ... V2 2017 11 17 12 06 00 36.6070 -97.4890 374.00 314.00 60.00 434021 SGP 2017 11 02 19 13 00 5144-99 G co CCGG 139.990 -999.990 ... V2 2017 11 17 12 22 00 36.6070 -97.4890 374.00 314.00 60.00 434022 SGP 2017 11 09 20 00 00 2589-99 G co CCGG 142.110 -999.990 ... V2 2017 11 28 11 06 00 36.6070 -97.4890 374.00 314.00 60.00 434584 SGP 2017 11 09 20 00 00 4777-99 G co CCGG 142.790 -999.990 ... V2 2017 11 28 11 22 00 36.6070 -97.4890 374.00 314.00 60.00 434585 SGP 2017 11 09 20 15 00 2880-99 G co CCGG 143.510 -999.990 ... V2 2017 11 28 09 47 00 36.6070 -97.4890 374.00 314.00 60.00 434586 SGP 2017 11 09 20 15 00 3434-99 G co CCGG 142.800 -999.990 ... V2 2017 11 28 10 02 00 36.6070 -97.4890 374.00 314.00 60.00 434587 SGP 2017 11 16 20 00 00 415-99 G co CCGG 146.830 -999.990 ... V2 2017 11 29 08 59 00 36.6070 -97.4890 374.00 314.00 60.00 434773 SGP 2017 11 16 20 00 00 5161-99 G co CCGG 145.480 -999.990 ... V2 2017 11 29 09 15 00 36.6070 -97.4890 374.00 314.00 60.00 434774 SGP 2017 11 16 20 15 00 2988-99 G co CCGG 143.750 -999.990 ... V2 2017 11 29 09 46 00 36.6070 -97.4890 374.00 314.00 60.00 434775 SGP 2017 11 16 20 15 00 682-99 G co CCGG 143.560 -999.990 ... V2 2017 11 29 09 30 00 36.6070 -97.4890 374.00 314.00 60.00 434776 SGP 2017 11 30 20 00 00 4520-99 G co CCGG 127.670 -999.990 ... V2 2017 12 11 14 50 00 36.6070 -97.4890 374.00 314.00 60.00 435214 SGP 2017 11 30 20 00 00 5197-99 G co CCGG 128.600 -999.990 ... V2 2017 12 11 15 06 00 36.6070 -97.4890 374.00 314.00 60.00 435215 SGP 2017 11 30 20 13 00 264-99 G co CCGG 128.380 -999.990 ... V2 2017 12 12 08 51 00 36.6070 -97.4890 374.00 314.00 60.00 435212 SGP 2017 11 30 20 13 00 5150-99 G co CCGG 127.610 -999.990 ... V2 2017 12 12 09 07 00 36.6070 -97.4890 374.00 314.00 60.00 435213 SGP 2017 12 07 20 00 00 3805-99 G co CCGG 127.140 -999.990 ... V2 2017 12 20 11 10 00 36.6070 -97.4890 374.00 314.00 60.00 435725 SGP 2017 12 07 20 00 00 562-99 G co CCGG 127.140 -999.990 ... V2 2017 12 20 10 54 00 36.6070 -97.4890 374.00 314.00 60.00 435724 SGP 2017 12 07 20 15 00 2188-99 G co CCGG 125.480 -999.990 ... V2 2017 12 21 09 05 00 36.6070 -97.4890 374.00 314.00 60.00 435778 SGP 2017 12 07 20 15 00 4332-99 G co CCGG 125.750 -999.990 ... V2 2017 12 21 09 21 00 36.6070 -97.4890 374.00 314.00 60.00 435779 SGP 2017 12 14 20 00 00 1656-99 G co CCGG 127.390 -999.990 ... V2 2017 12 28 12 43 00 36.6070 -97.4890 374.00 314.00 60.00 436064 SGP 2017 12 14 20 00 00 3301-99 G co CCGG 126.550 -999.990 ... V2 2017 12 28 12 59 00 36.6070 -97.4890 374.00 314.00 60.00 436065 SGP 2017 12 14 20 15 00 2422-99 G co CCGG 126.530 -999.990 ... V2 2017 12 28 13 46 00 36.6070 -97.4890 374.00 314.00 60.00 436066 SGP 2017 12 14 20 15 00 5199-99 G co CCGG 126.710 -999.990 ... V2 2017 12 28 14 02 00 36.6070 -97.4890 374.00 314.00 60.00 436067 SGP 2017 12 21 20 00 00 394-99 G co CCGG 139.150 -999.990 ... V2 2018 01 11 14 00 00 36.6070 -97.4890 374.00 314.00 60.00 436840 SGP 2017 12 21 20 00 00 5489-99 G co CCGG 139.250 -999.990 ... V2 2018 01 11 14 15 00 36.6070 -97.4890 374.00 314.00 60.00 436841 SGP 2017 12 21 20 13 00 3334-99 G co CCGG 137.780 -999.990 ... V2 2018 01 11 13 44 00 36.6070 -97.4890 374.00 314.00 60.00 436839 SGP 2017 12 21 20 13 00 577-99 G co CCGG 137.300 -999.990 ... V2 2018 01 11 13 28 00 36.6070 -97.4890 374.00 314.00 60.00 436838 SGP 2017 12 28 20 00 00 3036-99 G co CCGG 160.310 -999.990 ... V2 2018 01 30 16 06 00 36.6070 -97.4890 374.00 314.00 60.00 437543 SGP 2017 12 28 20 00 00 3484-99 G co CCGG 160.880 -999.990 ... V2 2018 01 30 16 22 00 36.6070 -97.4890 374.00 314.00 60.00 437544 SGP 2017 12 28 20 15 00 1594-99 G co CCGG 159.480 -999.990 ... V2 2018 01 18 16 57 00 36.6070 -97.4890 374.00 314.00 60.00 436831 SGP 2017 12 28 20 15 00 5167-99 G co CCGG 159.860 -999.990 ... V2 2018 01 18 17 13 00 36.6070 -97.4890 374.00 314.00 60.00 436830 SGP 2018 01 04 20 00 00 1588-99 G co CCGG 132.740 -999.990 ... V2 2018 01 26 14 55 00 36.6070 -97.4890 374.00 314.00 60.00 437366 SGP 2018 01 04 20 00 00 1599-99 G co CCGG 131.810 -999.990 ... V2 2018 01 26 15 11 00 36.6070 -97.4890 374.00 314.00 60.00 437367 SGP 2018 01 04 20 15 00 1640-99 G co CCGG 134.490 -999.990 ... V2 2018 01 26 14 24 00 36.6070 -97.4890 374.00 314.00 60.00 437362 SGP 2018 01 04 20 15 00 3526-99 G co CCGG 133.840 -999.990 ... V2 2018 01 26 14 40 00 36.6070 -97.4890 374.00 314.00 60.00 437363 SGP 2018 01 11 20 00 00 1578-99 G co CCGG 133.290 -999.990 N.. V2 2018 01 31 13 57 00 36.6070 -97.4890 374.00 314.00 60.00 437631 SGP 2018 01 11 20 00 00 4888-99 G co CCGG 130.270 -999.990 ... V2 2018 01 31 14 13 00 36.6070 -97.4890 374.00 314.00 60.00 437632 SGP 2018 01 11 20 15 00 1484-99 G co CCGG 130.240 -999.990 ... V2 2018 01 31 13 25 00 36.6070 -97.4890 374.00 314.00 60.00 437629 SGP 2018 01 11 20 15 00 1518-99 G co CCGG 130.420 -999.990 ... V2 2018 01 31 13 41 00 36.6070 -97.4890 374.00 314.00 60.00 437630 SGP 2018 01 18 20 00 00 4635-99 G co CCGG 139.790 -999.990 ... V2 2018 02 08 13 34 00 36.6070 -97.4890 374.00 314.00 60.00 437852 SGP 2018 01 18 20 00 00 4758-99 G co CCGG 140.750 -999.990 ... V2 2018 02 08 13 50 00 36.6070 -97.4890 374.00 314.00 60.00 437853 SGP 2018 01 18 20 15 00 4525-99 G co CCGG 137.620 -999.990 ... V2 2018 02 08 16 13 00 36.6070 -97.4890 374.00 314.00 60.00 437900 SGP 2018 01 18 20 15 00 5112-99 G co CCGG 137.060 -999.990 ... V2 2018 02 08 16 29 00 36.6070 -97.4890 374.00 314.00 60.00 437901 SGP 2018 02 01 20 00 00 1256-99 G co CCGG 138.830 -999.990 ... V2 2018 02 22 10 43 00 36.6070 -97.4890 374.00 314.00 60.00 438599 SGP 2018 02 01 20 00 00 2021-99 G co CCGG 138.900 -999.990 ... V2 2018 02 22 10 58 00 36.6070 -97.4890 374.00 314.00 60.00 438600 SGP 2018 02 01 20 15 00 2335-99 G co CCGG 138.030 -999.990 ... V2 2018 02 22 10 11 00 36.6070 -97.4890 374.00 314.00 60.00 438601 SGP 2018 02 01 20 15 00 4885-99 G co CCGG 139.710 -999.990 ... V2 2018 02 22 10 27 00 36.6070 -97.4890 374.00 314.00 60.00 438602 SGP 2018 02 08 20 00 00 1711-99 G co CCGG 145.370 -999.990 ... V2 2018 02 23 10 49 00 36.6070 -97.4890 374.00 314.00 60.00 438893 SGP 2018 02 08 20 00 00 784-99 G co CCGG 145.030 -999.990 ... V2 2018 02 23 10 33 00 36.6070 -97.4890 374.00 314.00 60.00 438894 SGP 2018 02 08 20 12 00 452-99 G co CCGG 143.920 -999.990 ... V2 2018 02 23 11 05 00 36.6070 -97.4890 374.00 314.00 60.00 438891 SGP 2018 02 08 20 12 00 4918-99 G co CCGG 143.580 -999.990 ... V2 2018 02 23 11 20 00 36.6070 -97.4890 374.00 314.00 60.00 438892 SGP 2018 02 15 20 00 00 302-99 G co CCGG 115.810 -999.990 ... V2 2018 03 06 09 37 00 36.6070 -97.4890 374.00 314.00 60.00 439563 SGP 2018 02 15 20 00 00 516-99 G co CCGG 115.430 -999.990 ... V2 2018 03 06 09 53 00 36.6070 -97.4890 374.00 314.00 60.00 439564 SGP 2018 02 15 20 15 00 3433-99 G co CCGG 120.380 -999.990 ... V2 2018 03 06 10 25 00 36.6070 -97.4890 374.00 314.00 60.00 439562 SGP 2018 02 15 20 15 00 967-99 G co CCGG 120.290 -999.990 ... V2 2018 03 06 10 09 00 36.6070 -97.4890 374.00 314.00 60.00 439561 SGP 2018 02 22 20 00 00 2334-99 G co CCGG 147.310 -999.990 ... V2 2018 03 08 10 25 00 36.6070 -97.4890 374.00 314.00 60.00 439594 SGP 2018 02 22 20 00 00 768-99 G co CCGG 148.700 -999.990 ... V2 2018 03 08 10 09 00 36.6070 -97.4890 374.00 314.00 60.00 439595 SGP 2018 02 22 20 13 00 2416-99 G co CCGG 147.610 -999.990 ... V2 2018 03 08 10 41 00 36.6070 -97.4890 374.00 314.00 60.00 439596 SGP 2018 02 22 20 13 00 3777-99 G co CCGG 146.930 -999.990 ... V2 2018 03 08 10 56 00 36.6070 -97.4890 374.00 314.00 60.00 439597 SGP 2018 03 01 20 00 00 173-99 G co CCGG 131.380 -999.990 ... V2 2018 03 12 11 26 00 36.6070 -97.4890 374.00 314.00 60.00 439792 SGP 2018 03 01 20 00 00 4939-99 G co CCGG 131.790 -999.990 ... V2 2018 03 12 11 42 00 36.6070 -97.4890 374.00 314.00 60.00 439793 SGP 2018 03 01 20 15 00 2515-99 G co CCGG 129.880 -999.990 ... V2 2018 03 12 12 17 00 36.6070 -97.4890 374.00 314.00 60.00 439794 SGP 2018 03 01 20 15 00 4743-99 G co CCGG 130.410 -999.990 ... V2 2018 03 12 12 33 00 36.6070 -97.4890 374.00 314.00 60.00 439795 SGP 2018 03 08 20 00 00 1818-99 G co CCGG 162.350 -999.990 ... V2 2018 03 19 15 07 00 36.6070 -97.4890 374.00 314.00 60.00 440258 SGP 2018 03 08 20 00 00 4034-99 G co CCGG 163.590 -999.990 ... V2 2018 03 19 15 22 00 36.6070 -97.4890 374.00 314.00 60.00 440259 SGP 2018 03 08 20 15 00 2318-99 G co CCGG 162.970 -999.990 ... V2 2018 03 19 14 51 00 36.6070 -97.4890 374.00 314.00 60.00 440257 SGP 2018 03 08 20 15 00 442-99 G co CCGG 163.680 -999.990 ... V2 2018 03 19 14 35 00 36.6070 -97.4890 374.00 314.00 60.00 440256 SGP 2018 03 15 19 00 00 1347-99 G co CCGG 174.020 -999.990 ... V2 2018 03 22 08 38 00 36.6070 -97.4890 374.00 314.00 60.00 440438 SGP 2018 03 15 19 00 00 4511-99 G co CCGG 175.070 -999.990 ... V2 2018 03 22 08 54 00 36.6070 -97.4890 374.00 314.00 60.00 440439 SGP 2018 03 15 19 15 00 4656-99 G co CCGG 171.540 -999.990 ... V2 2018 03 22 08 06 00 36.6070 -97.4890 374.00 314.00 60.00 440436 SGP 2018 03 15 19 15 00 5054-99 G co CCGG 170.450 -999.990 ... V2 2018 03 22 08 22 00 36.6070 -97.4890 374.00 314.00 60.00 440437 SGP 2018 03 22 19 00 00 4396-99 G co CCGG 164.230 -999.990 ... V2 2018 03 29 13 28 00 36.6070 -97.4890 374.00 314.00 60.00 440710 SGP 2018 03 22 19 00 00 4905-99 G co CCGG 164.890 -999.990 ... V2 2018 03 29 13 44 00 36.6070 -97.4890 374.00 314.00 60.00 440711 SGP 2018 03 22 19 30 00 1357-99 G co CCGG 159.540 -999.990 ... V2 2018 03 29 14 00 00 36.6070 -97.4890 374.00 314.00 60.00 440708 SGP 2018 03 22 19 30 00 3022-99 G co CCGG 159.200 -999.990 ... V2 2018 03 29 14 16 00 36.6070 -97.4890 374.00 314.00 60.00 440709 SGP 2018 03 29 19 00 00 3234-99 G co CCGG 145.870 -999.990 ... V2 2018 04 09 16 45 00 36.6070 -97.4890 374.00 314.00 60.00 441174 SGP 2018 03 29 19 00 00 4839-99 G co CCGG 145.040 -999.990 ... V2 2018 04 09 17 01 00 36.6070 -97.4890 374.00 314.00 60.00 441175 SGP 2018 03 29 19 12 00 1003-99 G co CCGG 143.010 -999.990 ... V2 2018 04 09 16 13 00 36.6070 -97.4890 374.00 314.00 60.00 441172 SGP 2018 03 29 19 12 00 283-99 G co CCGG 144.520 -999.990 ... V2 2018 04 09 16 29 00 36.6070 -97.4890 374.00 314.00 60.00 441173 SGP 2018 04 05 19 00 00 5212-99 G co CCGG 154.810 -999.990 ... V2 2018 04 13 13 56 00 36.6070 -97.4890 374.00 314.00 60.00 441403 SGP 2018 04 05 19 00 00 910-99 G co CCGG 155.820 -999.990 ... V2 2018 04 13 13 41 00 36.6070 -97.4890 374.00 314.00 60.00 441404 SGP 2018 04 05 19 15 00 1015-99 G co CCGG 155.570 -999.990 ... V2 2018 04 16 16 34 00 36.6070 -97.4890 374.00 314.00 60.00 441393 SGP 2018 04 05 19 15 00 4277-99 G co CCGG 167.460 -999.990 N.. V2 2018 04 16 16 50 00 36.6070 -97.4890 374.00 314.00 60.00 441394 SGP 2018 04 12 19 00 00 1663-99 G co CCGG 152.740 -999.990 ... V2 2018 04 23 16 27 00 36.6070 -97.4890 374.00 314.00 60.00 441957 SGP 2018 04 12 19 00 00 5700-99 G co CCGG 151.410 -999.990 ... V2 2018 04 23 16 43 00 36.6070 -97.4890 374.00 314.00 60.00 441956 SGP 2018 04 12 19 15 00 3088-99 G co CCGG 152.120 -999.990 ... V2 2018 04 23 16 11 00 36.6070 -97.4890 374.00 314.00 60.00 441955 SGP 2018 04 12 19 15 00 584-99 G co CCGG 151.730 -999.990 ... V2 2018 04 23 15 55 00 36.6070 -97.4890 374.00 314.00 60.00 441954 SGP 2018 04 19 19 00 00 1631-99 G co CCGG 133.100 -999.990 ... V2 2018 04 24 11 45 00 36.6070 -97.4890 374.00 314.00 60.00 441962 SGP 2018 04 19 19 00 00 2084-99 G co CCGG 133.290 -999.990 ... V2 2018 04 24 12 00 00 36.6070 -97.4890 374.00 314.00 60.00 441963 SGP 2018 04 19 19 15 00 1757-99 G co CCGG 132.920 -999.990 ... V2 2018 04 24 12 16 00 36.6070 -97.4890 374.00 314.00 60.00 441964 SGP 2018 04 19 19 15 00 4530-99 G co CCGG 132.430 -999.990 ... V2 2018 04 24 12 32 00 36.6070 -97.4890 374.00 314.00 60.00 441965 SGP 2018 04 26 19 00 00 5443-99 G co CCGG 144.770 -999.990 ... V2 2018 05 08 14 36 00 36.6070 -97.4890 374.00 314.00 60.00 442598 SGP 2018 04 26 19 00 00 5699-99 G co CCGG 144.080 -999.990 ... V2 2018 05 08 14 52 00 36.6070 -97.4890 374.00 314.00 60.00 442597 SGP 2018 04 26 19 15 00 1457-99 G co CCGG 144.390 -999.990 ... V2 2018 05 08 13 01 00 36.6070 -97.4890 374.00 314.00 60.00 442599 SGP 2018 04 26 19 15 00 5701-99 G co CCGG 144.860 -999.990 ... V2 2018 05 08 13 17 00 36.6070 -97.4890 374.00 314.00 60.00 442600 SGP 2018 05 03 19 00 00 1832-99 G co CCGG 121.330 -999.990 ... V2 2018 05 14 13 40 00 36.6070 -97.4890 374.00 314.00 60.00 443036 SGP 2018 05 03 19 00 00 4315-99 G co CCGG 121.560 -999.990 ... V2 2018 05 14 13 55 00 36.6070 -97.4890 374.00 314.00 60.00 443037 SGP 2018 05 03 19 15 00 2214-99 G co CCGG 121.030 -999.990 ... V2 2018 05 14 14 27 00 36.6070 -97.4890 374.00 314.00 60.00 443035 SGP 2018 05 03 19 15 00 358-99 G co CCGG 121.090 -999.990 ... V2 2018 05 14 14 11 00 36.6070 -97.4890 374.00 314.00 60.00 443034 SGP 2018 05 10 19 00 00 2078-99 G co CCGG 142.210 -999.990 ... V2 2018 05 24 10 21 00 36.6070 -97.4890 374.00 314.00 60.00 443848 SGP 2018 05 10 19 00 00 3094-99 G co CCGG 141.870 -999.990 ... V2 2018 05 24 10 37 00 36.6070 -97.4890 374.00 314.00 60.00 443849 SGP 2018 05 10 19 15 00 1235-99 G co CCGG 138.730 -999.990 ... V2 2018 05 24 16 10 00 36.6070 -97.4890 374.00 314.00 60.00 443840 SGP 2018 05 10 19 15 00 1235-99 G co CCGG 139.670 -999.990 ... V2 2018 05 25 11 08 00 36.6070 -97.4890 374.00 314.00 60.00 443840 SGP 2018 05 10 19 15 00 4204-99 G co CCGG 154.780 -999.990 A.. V2 2018 05 24 16 25 00 36.6070 -97.4890 374.00 314.00 60.00 443841 SGP 2018 05 10 19 15 00 4204-99 G co CCGG 139.400 -999.990 ... V2 2018 05 25 11 24 00 36.6070 -97.4890 374.00 314.00 60.00 443841 SGP 2018 05 17 19 00 00 1386-99 G co CCGG 131.260 -999.990 ... V2 2018 05 31 14 27 00 36.6070 -97.4890 374.00 314.00 60.00 444137 SGP 2018 05 17 19 00 00 2974-99 G co CCGG 130.640 -999.990 ... V2 2018 05 31 14 43 00 36.6070 -97.4890 374.00 314.00 60.00 444138 SGP 2018 05 17 19 13 00 3476-99 G co CCGG 133.120 -999.990 ... V2 2018 05 31 13 24 00 36.6070 -97.4890 374.00 314.00 60.00 444139 SGP 2018 05 17 19 13 00 4979-99 G co CCGG 133.260 -999.990 ... V2 2018 05 31 13 39 00 36.6070 -97.4890 374.00 314.00 60.00 444140 SGP 2018 05 24 19 00 00 2012-99 G co CCGG 125.000 -999.990 ... V2 2018 06 06 09 40 00 36.6070 -97.4890 374.00 314.00 60.00 444731 SGP 2018 05 24 19 00 00 3042-99 G co CCGG 125.220 -999.990 ... V2 2018 06 06 09 55 00 36.6070 -97.4890 374.00 314.00 60.00 444730 SGP 2018 05 24 19 15 00 2291-99 G co CCGG 121.230 -999.990 ... V2 2018 06 06 10 11 00 36.6070 -97.4890 374.00 314.00 60.00 444732 SGP 2018 05 24 19 15 00 3652-99 G co CCGG 121.110 -999.990 ... V2 2018 06 06 10 27 00 36.6070 -97.4890 374.00 314.00 60.00 444733 SGP 2018 05 31 19 00 00 1923-99 G co CCGG 128.390 -999.990 ... V2 2018 06 11 13 32 00 36.6070 -97.4890 374.00 314.00 60.00 444872 SGP 2018 05 31 19 00 00 4201-99 G co CCGG 128.770 -999.990 ... V2 2018 06 11 13 48 00 36.6070 -97.4890 374.00 314.00 60.00 444873 SGP 2018 05 31 19 13 00 1369-99 G co CCGG 128.730 -999.990 ... V2 2018 06 14 16 11 00 36.6070 -97.4890 374.00 314.00 60.00 445107 SGP 2018 05 31 19 13 00 227-99 G co CCGG 128.770 -999.990 ... V2 2018 06 14 15 55 00 36.6070 -97.4890 374.00 314.00 60.00 445108 SGP 2018 06 07 19 00 00 3228-99 G co CCGG 105.900 -999.990 ... V2 2018 06 25 11 59 00 36.6070 -97.4890 374.00 314.00 60.00 445472 SGP 2018 06 07 19 00 00 5610-99 G co CCGG 105.350 -999.990 ... V2 2018 06 25 12 15 00 36.6070 -97.4890 374.00 314.00 60.00 445473 SGP 2018 06 07 19 15 00 5456-99 G co CCGG 104.650 -999.990 ... V2 2018 06 25 11 27 00 36.6070 -97.4890 374.00 314.00 60.00 445474 SGP 2018 06 07 19 15 00 5464-99 G co CCGG 104.440 -999.990 ... V2 2018 06 25 11 43 00 36.6070 -97.4890 374.00 314.00 60.00 445475 SGP 2018 06 14 19 00 00 2780-99 G co CCGG 107.280 -999.990 ... V2 2018 06 21 12 51 00 36.6070 -97.4890 374.00 314.00 60.00 445428 SGP 2018 06 14 19 00 00 5214-99 G co CCGG 107.100 -999.990 ... V2 2018 06 21 13 06 00 36.6070 -97.4890 374.00 314.00 60.00 445429 SGP 2018 06 14 19 15 00 3609-99 G co CCGG 106.860 -999.990 ... V2 2018 06 21 10 28 00 36.6070 -97.4890 374.00 314.00 60.00 445453 SGP 2018 06 14 19 15 00 629-99 G co CCGG 106.970 -999.990 ... V2 2018 06 21 10 13 00 36.6070 -97.4890 374.00 314.00 60.00 445452 SGP 2018 06 21 19 00 00 4795-99 G co CCGG 112.410 -999.990 ... V2 2018 07 03 09 27 00 36.6070 -97.4890 374.00 314.00 60.00 445832 SGP 2018 06 21 19 00 00 579-99 G co CCGG 113.100 -999.990 ... V2 2018 07 03 09 12 00 36.6070 -97.4890 374.00 314.00 60.00 445833 SGP 2018 06 21 19 15 00 226-99 G co CCGG 111.070 -999.990 ... V2 2018 06 28 16 27 00 36.6070 -97.4890 374.00 314.00 60.00 445699 SGP 2018 06 21 19 15 00 5521-99 G co CCGG 111.290 -999.990 ... V2 2018 06 28 16 43 00 36.6070 -97.4890 374.00 314.00 60.00 445700 SGP 2018 06 28 19 00 00 2214-99 G co CCGG 103.310 -999.990 ... V2 2018 07 09 13 38 00 36.6070 -97.4890 374.00 314.00 60.00 446037 SGP 2018 06 28 19 00 00 2728-99 G co CCGG 103.190 -999.990 ... V2 2018 07 09 13 54 00 36.6070 -97.4890 374.00 314.00 60.00 446038 SGP 2018 06 28 19 15 00 253-99 G co CCGG 103.760 -999.990 ... V2 2018 07 09 13 06 00 36.6070 -97.4890 374.00 314.00 60.00 446035 SGP 2018 06 28 19 15 00 4218-99 G co CCGG 103.110 -999.990 ... V2 2018 07 09 13 22 00 36.6070 -97.4890 374.00 314.00 60.00 446036 SGP 2018 07 05 19 00 00 2316-99 G co CCGG 120.340 -999.990 ... V2 2018 07 17 14 27 00 36.6070 -97.4890 374.00 314.00 60.00 446429 SGP 2018 07 05 19 00 00 3823-99 G co CCGG 121.010 -999.990 ... V2 2018 07 17 14 42 00 36.6070 -97.4890 374.00 314.00 60.00 446430 SGP 2018 07 05 19 15 00 1616-99 G co CCGG 116.460 -999.990 ... V2 2018 07 17 13 55 00 36.6070 -97.4890 374.00 314.00 60.00 446431 SGP 2018 07 05 19 15 00 4310-99 G co CCGG 117.880 -999.990 ... V2 2018 07 17 14 10 00 36.6070 -97.4890 374.00 314.00 60.00 446432 SGP 2018 07 12 19 00 00 1141-99 G co CCGG 119.490 -999.990 ... V2 2018 07 24 10 09 00 36.6070 -97.4890 374.00 314.00 60.00 446589 SGP 2018 07 12 19 00 00 3337-99 G co CCGG 120.650 -999.990 ... V2 2018 07 24 10 25 00 36.6070 -97.4890 374.00 314.00 60.00 446590 SGP 2018 07 12 19 15 00 101-99 G co CCGG 119.320 -999.990 ... V2 2018 07 24 09 36 00 36.6070 -97.4890 374.00 314.00 60.00 446587 SGP 2018 07 12 19 15 00 3234-99 G co CCGG 125.230 -999.990 N.. V2 2018 07 24 09 52 00 36.6070 -97.4890 374.00 314.00 60.00 446588 SGP 2018 07 19 19 00 00 1015-99 G co CCGG 149.110 -999.990 ... V2 2018 07 26 13 19 00 36.6070 -97.4890 374.00 314.00 60.00 446861 SGP 2018 07 19 19 00 00 5320-99 G co CCGG 148.860 -999.990 ... V2 2018 07 26 13 35 00 36.6070 -97.4890 374.00 314.00 60.00 446862 SGP 2018 07 19 19 15 00 5054-99 G co CCGG 141.030 -999.990 ... V2 2018 07 26 13 03 00 36.6070 -97.4890 374.00 314.00 60.00 446860 SGP 2018 07 19 19 15 00 909-99 G co CCGG 140.550 -999.990 ... V2 2018 07 26 12 48 00 36.6070 -97.4890 374.00 314.00 60.00 446859 SGP 2018 07 26 19 00 00 2475-99 G co CCGG 133.780 -999.990 ... V2 2018 08 06 15 07 00 36.6070 -97.4890 374.00 314.00 60.00 447013 SGP 2018 07 26 19 00 00 4535-99 G co CCGG 133.850 -999.990 ... V2 2018 08 06 15 22 00 36.6070 -97.4890 374.00 314.00 60.00 447012 SGP 2018 07 26 19 15 00 1408-99 G co CCGG 135.360 -999.990 ... V2 2018 08 06 15 39 00 36.6070 -97.4890 374.00 314.00 60.00 447010 SGP 2018 07 26 19 15 00 2359-99 G co CCGG 135.900 -999.990 ... V2 2018 08 06 15 55 00 36.6070 -97.4890 374.00 314.00 60.00 447011 SGP 2018 08 02 19 15 00 3566-99 G co CCGG 147.210 -999.990 ... V2 2018 08 20 10 21 00 36.6070 -97.4890 374.00 314.00 60.00 447577 SGP 2018 08 02 19 15 00 5892-99 G co CCGG 147.480 -999.990 ... V2 2018 08 20 10 37 00 36.6070 -97.4890 374.00 314.00 60.00 447578 SGP 2018 08 09 19 00 00 3512-99 G co CCGG 139.760 -999.990 ... V2 2018 08 23 09 04 00 36.6070 -97.4890 374.00 314.00 60.00 448048 SGP 2018 08 09 19 00 00 5150-99 G co CCGG 138.890 -999.990 ... V2 2018 08 23 09 20 00 36.6070 -97.4890 374.00 314.00 60.00 448049 SGP 2018 08 16 19 15 00 1433-99 G co CCGG 122.170 -999.990 ... V2 2018 08 28 17 12 00 36.6070 -97.4890 374.00 314.00 60.00 448151 SGP 2018 08 16 19 15 00 989-99 G co CCGG 123.640 -999.990 ... V2 2018 08 28 16 57 00 36.6070 -97.4890 374.00 314.00 60.00 448152 SGP 2018 08 23 19 00 00 3356-99 G co CCGG 239.710 -999.990 .X. V2 2018 09 10 12 52 00 36.6070 -97.4890 374.00 314.00 60.00 448805 SGP 2018 08 23 19 00 00 3466-99 G co CCGG 239.820 -999.990 .X. V2 2018 09 10 13 08 00 36.6070 -97.4890 374.00 314.00 60.00 448806 SGP 2018 08 30 19 00 00 4583-99 G co CCGG 145.070 -999.990 ... V2 2018 09 10 12 21 00 36.6070 -97.4890 374.00 314.00 60.00 448771 SGP 2018 08 30 19 00 00 5397-99 G co CCGG 146.020 -999.990 ... V2 2018 09 10 12 37 00 36.6070 -97.4890 374.00 314.00 60.00 448772 SGP 2018 09 06 19 00 00 1662-99 G co CCGG 96.850 -999.990 ... V2 2018 09 21 09 07 00 36.6070 -97.4890 374.00 314.00 60.00 449202 SGP 2018 09 06 19 00 00 2350-99 G co CCGG 94.730 -999.990 ... V2 2018 09 21 09 23 00 36.6070 -97.4890 374.00 314.00 60.00 449203 SGP 2018 09 13 19 00 00 3861-99 G co CCGG 102.970 -999.990 ... V2 2018 09 20 17 33 00 36.6070 -97.4890 374.00 314.00 60.00 449204 SGP 2018 09 13 19 00 00 5095-99 G co CCGG 102.810 -999.990 ... V2 2018 09 20 17 49 00 36.6070 -97.4890 374.00 314.00 60.00 449205 SGP 2018 09 20 19 00 00 3636-99 G co CCGG 91.600 -999.990 ... V2 2018 10 05 12 53 00 36.6070 -97.4890 374.00 314.00 60.00 449809 SGP 2018 09 20 19 00 00 5369-99 G co CCGG 90.910 -999.990 ... V2 2018 10 05 13 09 00 36.6070 -97.4890 374.00 314.00 60.00 449810 SGP 2018 09 27 19 00 00 2124-99 G co CCGG 120.280 -999.990 ... V2 2018 10 05 13 25 00 36.6070 -97.4890 374.00 314.00 60.00 449811 SGP 2018 09 27 19 00 00 5324-99 G co CCGG 118.950 -999.990 ... V2 2018 10 05 13 41 00 36.6070 -97.4890 374.00 314.00 60.00 449812 SGP 2018 10 04 19 00 00 3871-99 G co CCGG 119.000 -999.990 ... V2 2018 10 22 09 51 00 36.6070 -97.4890 374.00 314.00 60.00 450460 SGP 2018 10 04 19 00 00 5637-99 G co CCGG 118.660 -999.990 ... V2 2018 10 22 10 07 00 36.6070 -97.4890 374.00 314.00 60.00 450461 SGP 2018 10 11 19 00 00 2606-99 G co CCGG 113.070 -999.990 ... V2 2018 10 19 16 25 00 36.6070 -97.4890 374.00 314.00 60.00 450458 SGP 2018 10 11 19 00 00 3060-99 G co CCGG 113.000 -999.990 ... V2 2018 10 19 16 41 00 36.6070 -97.4890 374.00 314.00 60.00 450459 SGP 2018 10 18 19 00 00 3209-99 G co CCGG 113.030 -999.990 ... V2 2018 11 07 12 48 00 36.6070 -97.4890 374.00 314.00 60.00 451081 SGP 2018 10 18 19 00 00 3267-99 G co CCGG 112.470 -999.990 ... V2 2018 11 07 13 04 00 36.6070 -97.4890 374.00 314.00 60.00 451082 SGP 2018 10 25 19 00 00 3467-99 G co CCGG 129.300 -999.990 ... V2 2018 11 07 13 51 00 36.6070 -97.4890 374.00 314.00 60.00 451079 SGP 2018 10 25 19 00 00 5167-99 G co CCGG 128.720 -999.990 ... V2 2018 11 07 14 07 00 36.6070 -97.4890 374.00 314.00 60.00 451080 SGP 2018 11 01 19 00 00 2547-99 G co CCGG 109.940 -999.990 ... V2 2018 11 16 14 09 00 36.6070 -97.4890 374.00 314.00 60.00 451439 SGP 2018 11 01 19 00 00 3400-99 G co CCGG 110.330 -999.990 ... V2 2018 11 16 14 25 00 36.6070 -97.4890 374.00 314.00 60.00 451440 SGP 2018 11 08 20 00 00 5446-99 G co CCGG 121.410 -999.990 ... V2 2018 11 16 13 53 00 36.6070 -97.4890 374.00 314.00 60.00 451437 SGP 2018 11 08 20 00 00 65-99 G co CCGG 121.920 -999.990 ... V2 2018 11 16 13 37 00 36.6070 -97.4890 374.00 314.00 60.00 451438 SGP 2018 11 15 20 00 00 4752-99 G co CCGG 111.350 -999.990 ... V2 2018 12 17 14 11 00 36.6070 -97.4890 374.00 314.00 60.00 452662 SGP 2018 11 15 20 00 00 894-99 G co CCGG 111.360 -999.990 ... V2 2018 12 17 13 55 00 36.6070 -97.4890 374.00 314.00 60.00 452663 SGP 2018 11 23 20 00 00 1127-99 G co CCGG 108.070 -999.990 ... V2 2018 12 10 14 49 00 36.6070 -97.4890 374.00 314.00 60.00 452032 SGP 2018 11 23 20 00 00 5610-99 G co CCGG 109.700 -999.990 ... V2 2018 12 10 15 04 00 36.6070 -97.4890 374.00 314.00 60.00 452033 SGP 2018 11 29 20 00 00 1629-99 G co CCGG 157.620 -999.990 ... V2 2019 01 14 15 51 00 36.6070 -97.4890 374.00 314.00 60.00 452864 SGP 2018 11 29 20 00 00 4579-99 G co CCGG 157.730 -999.990 ... V2 2019 01 14 16 07 00 36.6070 -97.4890 374.00 314.00 60.00 452865 SGP 2018 12 06 20 00 00 3176-99 G co CCGG 127.010 -999.990 ... V2 2019 01 14 16 23 00 36.6070 -97.4890 374.00 314.00 60.00 452862 SGP 2018 12 06 20 00 00 4393-99 G co CCGG 126.700 -999.990 ... V2 2019 01 14 16 39 00 36.6070 -97.4890 374.00 314.00 60.00 452863 SGP 2018 12 13 20 00 00 1547-99 G co CCGG 120.380 -999.990 ... V2 2019 01 22 13 10 00 36.6070 -97.4890 374.00 314.00 60.00 453333 SGP 2018 12 13 20 00 00 1712-99 G co CCGG 119.730 -999.990 ... V2 2019 01 22 13 26 00 36.6070 -97.4890 374.00 314.00 60.00 453334 SGP 2018 12 20 20 00 00 3566-99 G co CCGG 117.140 -999.990 ... V2 2019 01 22 13 58 00 36.6070 -97.4890 374.00 314.00 60.00 453332 SGP 2018 12 20 20 00 00 38-99 G co CCGG 117.570 -999.990 ... V2 2019 01 22 13 42 00 36.6070 -97.4890 374.00 314.00 60.00 453331 SGP 2018 12 27 20 00 00 1848-99 G co CCGG 121.260 -999.990 ... V2 2019 01 28 11 15 00 36.6070 -97.4890 374.00 314.00 60.00 453396 SGP 2018 12 27 20 00 00 3246-99 G co CCGG 120.980 -999.990 ... V2 2019 01 28 11 31 00 36.6070 -97.4890 374.00 314.00 60.00 453397 SGP 2019 01 03 20 00 00 3410-99 G co CCGG 141.200 -999.990 ... V2 2019 01 28 10 43 00 36.6070 -97.4890 374.00 314.00 60.00 453394 SGP 2019 01 03 20 00 00 3949-99 G co CCGG 141.490 -999.990 ... V2 2019 01 28 10 59 00 36.6070 -97.4890 374.00 314.00 60.00 453395 SGP 2019 01 10 20 00 00 2307-99 G co CCGG 143.910 -999.990 ... V2 2019 02 14 13 41 00 36.6070 -97.4890 374.00 314.00 60.00 454050 SGP 2019 01 10 20 00 00 5673-99 G co CCGG 143.060 -999.990 ... V2 2019 02 14 13 57 00 36.6070 -97.4890 374.00 314.00 60.00 454051 SGP 2019 01 17 20 00 00 4970-99 G co CCGG 149.550 -999.990 ... V2 2019 02 14 15 16 00 36.6070 -97.4890 374.00 314.00 60.00 454048 SGP 2019 01 17 20 00 00 5400-99 G co CCGG 149.820 -999.990 ... V2 2019 02 14 15 32 00 36.6070 -97.4890 374.00 314.00 60.00 454049 SGP 2019 01 24 20 00 00 3467-99 G co CCGG 132.510 -999.990 ... V2 2019 02 15 12 27 00 36.6070 -97.4890 374.00 314.00 60.00 454373 SGP 2019 01 24 20 00 00 4753-99 G co CCGG 132.590 -999.990 ... V2 2019 02 15 12 43 00 36.6070 -97.4890 374.00 314.00 60.00 454374 SGP 2019 01 31 20 00 00 181-99 G co CCGG 174.900 -999.990 ... V2 2019 02 15 12 59 00 36.6070 -97.4890 374.00 314.00 60.00 454371 SGP 2019 01 31 20 00 00 5167-99 G co CCGG 174.580 -999.990 ... V2 2019 02 15 13 15 00 36.6070 -97.4890 374.00 314.00 60.00 454372 SGP 2019 02 07 20 00 00 5615-99 G co CCGG 126.630 -999.990 ... V2 2019 03 01 15 14 00 36.6070 -97.4890 374.00 314.00 60.00 454905 SGP 2019 02 07 20 00 00 908-99 G co CCGG 125.570 -999.990 ... V2 2019 03 01 14 58 00 36.6070 -97.4890 374.00 314.00 60.00 454904 SGP 2019 02 14 20 00 00 4738-99 G co CCGG 130.130 -999.990 ... V2 2019 03 01 15 29 00 36.6070 -97.4890 374.00 314.00 60.00 454906 SGP 2019 02 14 20 00 00 5462-99 G co CCGG 129.580 -999.990 ... V2 2019 03 01 15 45 00 36.6070 -97.4890 374.00 314.00 60.00 454907 SGP 2019 02 21 20 00 00 4883-99 G co CCGG 148.730 -999.990 ... V2 2019 03 11 14 21 00 36.6070 -97.4890 374.00 314.00 60.00 455543 SGP 2019 02 21 20 00 00 5184-99 G co CCGG 148.430 -999.990 ... V2 2019 03 11 14 37 00 36.6070 -97.4890 374.00 314.00 60.00 455544 SGP 2019 02 28 20 00 00 2938-99 G co CCGG 151.690 -999.990 ... V2 2019 03 11 14 53 00 36.6070 -97.4890 374.00 314.00 60.00 455546 SGP 2019 02 28 20 00 00 3362-99 G co CCGG 152.470 -999.990 ... V2 2019 03 11 15 09 00 36.6070 -97.4890 374.00 314.00 60.00 455545 SGP 2019 03 08 20 00 00 2023-99 G co CCGG 161.950 -999.990 ... V2 2019 03 25 13 23 00 36.6070 -97.4890 374.00 314.00 60.00 456043 SGP 2019 03 08 20 00 00 2145-99 G co CCGG 161.930 -999.990 ... V2 2019 03 25 13 38 00 36.6070 -97.4890 374.00 314.00 60.00 456044 SGP 2019 03 14 19 00 00 1241-99 G co CCGG 130.970 -999.990 ... V2 2019 03 25 13 07 00 36.6070 -97.4890 374.00 314.00 60.00 456041 SGP 2019 03 14 19 00 00 177-99 G co CCGG 130.550 -999.990 ... V2 2019 03 25 12 51 00 36.6070 -97.4890 374.00 314.00 60.00 456042 SGP 2019 03 21 19 00 00 1770-99 G co CCGG 140.980 -999.990 ... V2 2019 04 02 16 50 00 36.6070 -97.4890 374.00 314.00 60.00 456424 SGP 2019 03 21 19 00 00 5400-99 G co CCGG 140.770 -999.990 ... V2 2019 04 02 17 06 00 36.6070 -97.4890 374.00 314.00 60.00 456425 SGP 2019 03 28 19 00 00 4395-99 G co CCGG 160.890 -999.990 ... V2 2019 04 03 09 08 00 36.6070 -97.4890 374.00 314.00 60.00 456422 SGP 2019 03 28 19 00 00 4970-99 G co CCGG 161.420 -999.990 ... V2 2019 04 03 09 24 00 36.6070 -97.4890 374.00 314.00 60.00 456423 SGP 2019 04 04 19 00 00 1543-99 G co CCGG 158.130 -999.990 ... V2 2019 04 30 12 37 00 36.6070 -97.4890 374.00 314.00 60.00 457146 SGP 2019 04 04 19 00 00 3995-99 G co CCGG 157.010 -999.990 ... V2 2019 04 30 12 52 00 36.6070 -97.4890 374.00 314.00 60.00 457147 SGP 2019 04 11 19 00 00 3674-99 G co CCGG 139.820 -999.990 ... V2 2019 04 30 12 05 00 36.6070 -97.4890 374.00 314.00 60.00 457144 SGP 2019 04 11 19 00 00 4441-99 G co CCGG 140.400 -999.990 ... V2 2019 04 30 12 21 00 36.6070 -97.4890 374.00 314.00 60.00 457145 SGP 2019 04 18 19 00 00 1737-99 G co CCGG 121.290 -999.990 A.. V2 2019 05 14 11 13 00 36.6070 -97.4890 374.00 314.00 60.00 458327 SGP 2019 04 18 19 00 00 2195-99 G co CCGG 130.000 -999.990 A.. V2 2019 05 14 11 29 00 36.6070 -97.4890 374.00 314.00 60.00 458328 SGP 2019 04 25 19 00 00 2681-99 G co CCGG 142.760 -999.990 ... V2 2019 05 14 11 44 00 36.6070 -97.4890 374.00 314.00 60.00 458325 SGP 2019 04 25 19 00 00 3499-99 G co CCGG 144.210 -999.990 ... V2 2019 05 14 12 00 00 36.6070 -97.4890 374.00 314.00 60.00 458326 SGP 2019 05 02 19 00 00 2088-99 G co CCGG 155.380 -999.990 ... V2 2019 05 29 14 24 00 36.6070 -97.4890 374.00 314.00 60.00 458966 SGP 2019 05 02 19 00 00 5250-99 G co CCGG 154.560 -999.990 ... V2 2019 05 29 14 40 00 36.6070 -97.4890 374.00 314.00 60.00 458967 SGP 2019 05 09 19 00 00 1047-99 G co CCGG 126.260 -999.990 ... V2 2019 05 29 13 53 00 36.6070 -97.4890 374.00 314.00 60.00 458968 SGP 2019 05 09 19 00 00 1777-99 G co CCGG 126.970 -999.990 ... V2 2019 05 29 14 08 00 36.6070 -97.4890 374.00 314.00 60.00 458969 SGP 2019 05 16 19 00 00 235-99 G co CCGG 143.020 -999.990 ... V2 2019 06 14 16 41 00 36.6070 -97.4890 374.00 314.00 60.00 459543 SGP 2019 05 16 19 00 00 2604-99 G co CCGG 143.780 -999.990 ... V2 2019 06 14 16 56 00 36.6070 -97.4890 374.00 314.00 60.00 459544 SGP 2019 05 23 19 00 00 3766-99 G co CCGG 151.890 -999.990 ... V2 2019 06 14 16 25 00 36.6070 -97.4890 374.00 314.00 60.00 459542 SGP 2019 05 23 19 00 00 930-99 G co CCGG 151.120 -999.990 ... V2 2019 06 14 16 09 00 36.6070 -97.4890 374.00 314.00 60.00 459541 SGP 2019 05 30 19 00 00 4050-99 G co CCGG 138.690 -999.990 ... V2 2019 06 28 10 41 00 36.6070 -97.4890 374.00 314.00 60.00 460180 SGP 2019 05 30 19 00 00 863-99 G co CCGG 137.860 -999.990 ... V2 2019 06 28 10 25 00 36.6070 -97.4890 374.00 314.00 60.00 460181 SGP 2019 06 07 19 00 00 1960-99 G co CCGG 132.230 -999.990 ... V2 2019 06 28 10 57 00 36.6070 -97.4890 374.00 314.00 60.00 460178 SGP 2019 06 07 19 00 00 1968-99 G co CCGG 132.530 -999.990 ... V2 2019 06 28 11 13 00 36.6070 -97.4890 374.00 314.00 60.00 460179 SGP 2019 06 13 19 00 00 2325-99 G co CCGG 119.680 -999.990 ... V2 2019 07 18 15 15 00 36.6070 -97.4890 374.00 314.00 60.00 461314 SGP 2019 06 13 19 00 00 2728-99 G co CCGG 119.180 -999.990 ... V2 2019 07 18 14 59 00 36.6070 -97.4890 374.00 314.00 60.00 461315 SGP 2019 06 20 19 00 00 4446-99 G co CCGG 134.650 -999.990 ... V2 2019 07 10 14 33 00 36.6070 -97.4890 374.00 314.00 60.00 461104 SGP 2019 06 20 19 00 00 5320-99 G co CCGG 133.810 -999.990 ... V2 2019 07 10 14 49 00 36.6070 -97.4890 374.00 314.00 60.00 461105 SGP 2019 06 27 19 00 00 2207-99 G co CCGG 110.230 -999.990 ... V2 2019 07 26 10 09 00 36.6070 -97.4890 374.00 314.00 60.00 461682 SGP 2019 06 27 19 00 00 3139-99 G co CCGG 110.810 -999.990 ... V2 2019 07 26 10 25 00 36.6070 -97.4890 374.00 314.00 60.00 461683 SGP 2019 07 05 19 00 00 4201-99 G co CCGG 121.910 -999.990 ... V2 2019 07 23 16 40 00 36.6070 -97.4890 374.00 314.00 60.00 461704 SGP 2019 07 05 19 00 00 5463-99 G co CCGG 121.500 -999.990 ... V2 2019 07 23 16 56 00 36.6070 -97.4890 374.00 314.00 60.00 461705 SGP 2019 07 11 19 00 00 2112-99 G co CCGG 126.980 -999.990 ... V2 2019 08 06 12 20 00 36.6070 -97.4890 374.00 314.00 60.00 462923 SGP 2019 07 11 19 00 00 2144-99 G co CCGG 127.090 -999.990 ... V2 2019 08 06 12 36 00 36.6070 -97.4890 374.00 314.00 60.00 462924 SGP 2019 07 18 19 15 00 1888-99 G co CCGG 100.760 -999.990 ... V2 2019 08 06 11 49 00 36.6070 -97.4890 374.00 314.00 60.00 462922 SGP 2019 07 18 19 15 00 2701-99 G co CCGG 100.440 -999.990 ... V2 2019 08 06 12 04 00 36.6070 -97.4890 374.00 314.00 60.00 462921 SGP 2019 07 25 19 00 00 2997-99 G co CCGG 152.730 -999.990 ... AR2 2019 08 22 11 13 30 36.6070 -97.4890 374.00 314.00 60.00 463524 SGP 2019 07 25 19 00 00 663-99 G co CCGG 152.750 -999.990 ... AR2 2019 08 22 10 59 10 36.6070 -97.4890 374.00 314.00 60.00 463523 SGP 2019 08 01 19 00 00 401-99 G co CCGG 132.690 -999.990 ... AR2 2019 08 21 11 56 56 36.6070 -97.4890 374.00 314.00 60.00 463525 SGP 2019 08 01 19 00 00 4490-99 G co CCGG 133.940 -999.990 ... AR2 2019 08 21 12 11 12 36.6070 -97.4890 374.00 314.00 60.00 463526 SGP 2019 08 08 19 00 00 2148-99 G co CCGG 110.550 -999.990 ... AR2 2019 09 05 16 18 48 36.6070 -97.4890 374.00 314.00 60.00 464012 SGP 2019 08 08 19 00 00 3876-99 G co CCGG 110.540 -999.990 ... AR2 2019 09 05 16 33 08 36.6070 -97.4890 374.00 314.00 60.00 464013 SGP 2019 08 15 19 00 00 2261-99 G co CCGG 139.410 -999.990 ... AR2 2019 09 05 13 45 50 36.6070 -97.4890 374.00 314.00 60.00 464010 SGP 2019 08 15 19 00 00 5138-99 G co CCGG 139.320 -999.990 ... AR2 2019 09 05 14 00 09 36.6070 -97.4890 374.00 314.00 60.00 464011 SGP 2019 08 22 19 00 00 2909-99 G co CCGG 136.140 -999.990 A.. AR2 2019 09 27 10 50 14 36.6070 -97.4890 374.00 314.00 60.00 464800 SGP 2019 08 22 19 00 00 2909-99 G co CCGG 104.390 -999.990 ... AR2 2019 09 27 14 39 07 36.6070 -97.4890 374.00 314.00 60.00 464800 SGP 2019 08 22 19 00 00 424-99 G co CCGG 132.840 -999.990 A.. AR2 2019 09 27 10 36 05 36.6070 -97.4890 374.00 314.00 60.00 464799 SGP 2019 08 22 19 00 00 424-99 G co CCGG 104.500 -999.990 ... AR2 2019 09 27 14 24 44 36.6070 -97.4890 374.00 314.00 60.00 464799 SGP 2019 08 29 19 00 00 5433-99 G co CCGG 140.400 -999.990 ... AR2 2019 09 27 09 38 40 36.6070 -97.4890 374.00 314.00 60.00 464805 SGP 2019 08 29 19 00 00 5627-99 G co CCGG 140.030 -999.990 ... AR2 2019 09 27 09 53 01 36.6070 -97.4890 374.00 314.00 60.00 464806 SGP 2019 08 29 19 20 00 1068-99 G co CCGG 134.470 -999.990 ... AR2 2019 09 27 09 09 58 36.6070 -97.4890 374.00 314.00 60.00 464803 SGP 2019 08 29 19 20 00 3506-99 G co CCGG 134.840 -999.990 ... AR2 2019 09 27 09 24 19 36.6070 -97.4890 374.00 314.00 60.00 464804 SGP 2019 09 03 19 00 00 4102-99 G co CCGG 171.720 -999.990 ... AR2 2019 09 27 10 07 23 36.6070 -97.4890 374.00 314.00 60.00 464801 SGP 2019 09 03 19 00 00 5464-99 G co CCGG 171.770 -999.990 ... AR2 2019 09 27 10 21 44 36.6070 -97.4890 374.00 314.00 60.00 464802 SGP 2019 09 05 19 00 00 288-99 G co CCGG 155.860 -999.990 ... AR2 2019 09 18 14 44 02 36.6070 -97.4890 374.00 314.00 60.00 464807 SGP 2019 09 05 19 00 00 3585-99 G co CCGG 157.060 -999.990 ... AR2 2019 09 18 14 58 19 36.6070 -97.4890 374.00 314.00 60.00 464808 SGP 2019 09 05 19 15 00 1410-99 G co CCGG 146.460 -999.990 ... AR2 2019 09 18 15 12 36 36.6070 -97.4890 374.00 314.00 60.00 464789 SGP 2019 09 05 19 15 00 2800-99 G co CCGG 146.530 -999.990 ... AR2 2019 09 18 15 26 59 36.6070 -97.4890 374.00 314.00 60.00 464790 SGP 2019 09 12 19 00 00 1281-99 G co CCGG 97.640 -999.990 ... AR2 2019 10 16 10 39 26 36.6070 -97.4890 374.00 314.00 60.00 465740 SGP 2019 09 12 19 00 00 2448-99 G co CCGG 97.540 -999.990 ... AR2 2019 10 16 10 53 48 36.6070 -97.4890 374.00 314.00 60.00 465741 SGP 2019 09 12 19 15 00 1493-99 G co CCGG 99.920 -999.990 ... AR2 2019 10 16 11 08 10 36.6070 -97.4890 374.00 314.00 60.00 465738 SGP 2019 09 12 19 15 00 3820-99 G co CCGG 99.470 -999.990 ... AR2 2019 10 16 11 22 33 36.6070 -97.4890 374.00 314.00 60.00 465739 SGP 2019 09 19 19 00 00 2174-99 G co CCGG 101.270 -999.990 ... AR2 2019 10 17 09 46 03 36.6070 -97.4890 374.00 314.00 60.00 465764 SGP 2019 09 19 19 00 00 3334-99 G co CCGG 101.170 -999.990 ... AR2 2019 10 17 10 00 24 36.6070 -97.4890 374.00 314.00 60.00 465765 SGP 2019 09 19 19 15 00 4092-99 G co CCGG 100.910 -999.990 ... AR2 2019 10 17 10 14 45 36.6070 -97.4890 374.00 314.00 60.00 465766 SGP 2019 09 19 19 15 00 4233-99 G co CCGG 100.790 -999.990 ... AR2 2019 10 17 10 29 06 36.6070 -97.4890 374.00 314.00 60.00 465767 SGP 2019 09 26 19 00 00 4678-99 G co CCGG 114.200 -999.990 ... AR2 2019 10 21 13 19 52 36.6070 -97.4890 374.00 314.00 60.00 465819 SGP 2019 09 26 19 00 00 76-99 G co CCGG 114.930 -999.990 ... AR2 2019 10 21 13 05 31 36.6070 -97.4890 374.00 314.00 60.00 465820 SGP 2019 09 26 19 15 00 2915-99 G co CCGG 116.480 -999.990 ... AR2 2019 10 21 12 51 04 36.6070 -97.4890 374.00 314.00 60.00 465818 SGP 2019 09 26 19 15 00 430-99 G co CCGG 115.880 -999.990 ... AR2 2019 10 21 12 36 43 36.6070 -97.4890 374.00 314.00 60.00 465817 SGP 2019 10 03 19 00 00 2698-99 G co CCGG 115.440 -999.990 ... AR2 2019 10 29 15 27 16 36.6070 -97.4890 374.00 314.00 60.00 466400 SGP 2019 10 03 19 00 00 8-99 G co CCGG 115.400 -999.990 ... AR2 2019 10 29 15 12 58 36.6070 -97.4890 374.00 314.00 60.00 466399 SGP 2019 10 03 19 10 00 1869-99 G co CCGG 117.830 -999.990 ... AR2 2019 10 29 15 55 55 36.6070 -97.4890 374.00 314.00 60.00 466398 SGP 2019 10 03 19 10 00 638-99 G co CCGG 117.100 -999.990 ... AR2 2019 10 29 15 41 35 36.6070 -97.4890 374.00 314.00 60.00 466397 SGP 2019 10 10 19 00 00 1689-99 G co CCGG 111.760 -999.990 ... AR2 2019 11 07 13 40 48 36.6070 -97.4890 374.00 314.00 60.00 466519 SGP 2019 10 10 19 00 00 3426-99 G co CCGG 111.620 -999.990 ... AR2 2019 11 07 13 55 06 36.6070 -97.4890 374.00 314.00 60.00 466520 SGP 2019 10 10 19 15 00 1877-99 G co CCGG 110.930 -999.990 ... AR2 2019 11 07 13 12 10 36.6070 -97.4890 374.00 314.00 60.00 466517 SGP 2019 10 10 19 15 00 2534-99 G co CCGG 111.250 -999.990 ... AR2 2019 11 07 13 26 29 36.6070 -97.4890 374.00 314.00 60.00 466518 SGP 2019 10 17 19 00 00 314-99 G co CCGG 126.520 -999.990 ... AR2 2019 11 12 13 35 21 36.6070 -97.4890 374.00 314.00 60.00 466743 SGP 2019 10 17 19 00 00 5043-99 G co CCGG 126.580 -999.990 ... AR2 2019 11 12 13 49 43 36.6070 -97.4890 374.00 314.00 60.00 466744 SGP 2019 10 17 19 15 00 2032-99 G co CCGG 126.670 -999.990 ... AR2 2019 11 12 14 04 07 36.6070 -97.4890 374.00 314.00 60.00 466741 SGP 2019 10 17 19 15 00 3855-99 G co CCGG 126.540 -999.990 ... AR2 2019 11 12 14 18 28 36.6070 -97.4890 374.00 314.00 60.00 466742 SGP 2019 10 24 19 00 00 2138-99 G co CCGG 110.740 -999.990 ... AR2 2019 11 19 14 11 57 36.6070 -97.4890 374.00 314.00 60.00 467505 SGP 2019 10 24 19 00 00 3054-99 G co CCGG 110.800 -999.990 ... AR2 2019 11 19 14 26 16 36.6070 -97.4890 374.00 314.00 60.00 467506 SGP 2019 10 24 19 15 00 3129-99 G co CCGG 110.710 -999.990 ... AR2 2019 11 19 13 57 39 36.6070 -97.4890 374.00 314.00 60.00 467504 SGP 2019 10 24 19 15 00 434-99 G co CCGG 110.710 -999.990 ... AR2 2019 11 19 13 43 14 36.6070 -97.4890 374.00 314.00 60.00 467503 SGP 2019 10 31 19 00 00 3128-99 G co CCGG 110.820 -999.990 ... AR2 2019 11 19 10 51 45 36.6070 -97.4890 374.00 314.00 60.00 467541 SGP 2019 10 31 19 00 00 5281-99 G co CCGG 110.580 -999.990 ... AR2 2019 11 19 11 06 05 36.6070 -97.4890 374.00 314.00 60.00 467542 SGP 2019 10 31 19 15 00 2324-99 G co CCGG 110.190 -999.990 ... AR2 2019 11 19 10 23 04 36.6070 -97.4890 374.00 314.00 60.00 467539 SGP 2019 10 31 19 15 00 4608-99 G co CCGG 110.150 -999.990 ... AR2 2019 11 19 10 37 26 36.6070 -97.4890 374.00 314.00 60.00 467540 SGP 2019 11 07 20 00 00 2968-99 G co CCGG 117.180 -999.990 ... AR2 2019 11 22 11 28 38 36.6070 -97.4890 374.00 314.00 60.00 467632 SGP 2019 11 07 20 00 00 3665-99 G co CCGG 117.080 -999.990 ... AR2 2019 11 22 11 43 00 36.6070 -97.4890 374.00 314.00 60.00 467633 SGP 2019 11 07 20 12 00 1554-99 G co CCGG 117.080 -999.990 ... AR2 2019 11 22 12 11 38 36.6070 -97.4890 374.00 314.00 60.00 467606 SGP 2019 11 07 20 12 00 4131-99 G co CCGG 117.840 -999.990 ... AR2 2019 11 22 11 57 19 36.6070 -97.4890 374.00 314.00 60.00 467607 SGP 2019 11 14 20 00 00 1479-99 G co CCGG 112.830 -999.990 ... AR2 2019 12 09 13 35 11 36.6070 -97.4890 374.00 314.00 60.00 467839 SGP 2019 11 14 20 00 00 958-99 G co CCGG 111.950 -999.990 ... AR2 2019 12 09 13 20 51 36.6070 -97.4890 374.00 314.00 60.00 467838 SGP 2019 11 14 20 15 00 1893-99 G co CCGG 108.160 -999.990 ... AR2 2019 12 09 12 52 10 36.6070 -97.4890 374.00 314.00 60.00 467840 SGP 2019 11 14 20 15 00 3818-99 G co CCGG 108.680 -999.990 ... AR2 2019 12 09 13 06 32 36.6070 -97.4890 374.00 314.00 60.00 467841 SGP 2019 11 21 20 00 00 2995-99 G co CCGG 119.340 -999.990 ... AR2 2019 12 11 12 57 31 36.6070 -97.4890 374.00 314.00 60.00 468072 SGP 2019 11 21 20 00 00 502-99 G co CCGG 119.320 -999.990 ... AR2 2019 12 11 12 43 13 36.6070 -97.4890 374.00 314.00 60.00 468071 SGP 2019 11 21 20 12 00 2014-99 G co CCGG 118.660 -999.990 ... AR2 2019 12 10 16 38 10 36.6070 -97.4890 374.00 314.00 60.00 468073 SGP 2019 11 21 20 12 00 3334-99 G co CCGG 118.680 -999.990 ... AR2 2019 12 10 16 52 29 36.6070 -97.4890 374.00 314.00 60.00 468074 SGP 2019 12 05 20 00 00 2668-99 G co CCGG 178.940 -999.990 ... AR2 2020 01 06 10 15 53 36.6070 -97.4890 374.00 314.00 60.00 468505 SGP 2019 12 05 20 00 00 5464-99 G co CCGG 178.850 -999.990 ... AR2 2020 01 06 10 30 15 36.6070 -97.4890 374.00 314.00 60.00 468506 SGP 2019 12 05 20 15 00 2261-99 G co CCGG 182.240 -999.990 ... AR2 2020 01 02 16 21 45 36.6070 -97.4890 374.00 314.00 60.00 468507 SGP 2019 12 05 20 15 00 4102-99 G co CCGG 181.510 -999.990 ... AR2 2020 01 02 16 36 08 36.6070 -97.4890 374.00 314.00 60.00 468508 SGP 2019 12 12 20 00 00 4713-99 G co CCGG 130.020 -999.990 ... AR2 2020 01 23 13 00 56 36.6070 -97.4890 374.00 314.00 60.00 469016 SGP 2019 12 12 20 00 00 4962-99 G co CCGG 130.190 -999.990 ... AR2 2020 01 23 13 15 17 36.6070 -97.4890 374.00 314.00 60.00 469017 SGP 2019 12 12 20 15 00 424-99 G co CCGG 129.580 -999.990 ... AR2 2020 01 23 12 32 04 36.6070 -97.4890 374.00 314.00 60.00 469014 SGP 2019 12 12 20 15 00 4389-99 G co CCGG 129.970 -999.990 ... AR2 2020 01 23 12 46 31 36.6070 -97.4890 374.00 314.00 60.00 469015 SGP 2019 12 19 20 00 00 1250-99 G co CCGG 121.660 -999.990 ... AR2 2020 01 27 15 39 58 36.6070 -97.4890 374.00 314.00 60.00 469178 SGP 2019 12 19 20 00 00 2056-99 G co CCGG 121.880 -999.990 ... AR2 2020 01 27 15 54 19 36.6070 -97.4890 374.00 314.00 60.00 469179 SGP 2019 12 19 20 15 00 463-99 G co CCGG 120.770 -999.990 ... AR2 2020 01 27 15 11 12 36.6070 -97.4890 374.00 314.00 60.00 469180 SGP 2019 12 19 20 15 00 791-99 G co CCGG 120.700 -999.990 ... AR2 2020 01 27 15 25 37 36.6070 -97.4890 374.00 314.00 60.00 469181 SGP 2019 12 26 20 00 00 2141-99 G co CCGG 134.350 -999.990 ... AR2 2020 01 29 11 44 31 36.6070 -97.4890 374.00 314.00 60.00 469224 SGP 2019 12 26 20 00 00 3665-99 G co CCGG 134.270 -999.990 ... AR2 2020 01 29 11 58 53 36.6070 -97.4890 374.00 314.00 60.00 469225 SGP 2019 12 26 20 13 00 1343-99 G co CCGG 133.950 -999.990 ... AR2 2020 01 29 11 15 49 36.6070 -97.4890 374.00 314.00 60.00 469226 SGP 2019 12 26 20 13 00 2996-99 G co CCGG 133.990 -999.990 ... AR2 2020 01 29 11 30 10 36.6070 -97.4890 374.00 314.00 60.00 469227 SGP 2020 01 02 20 00 00 5689-99 G co CCGG 142.960 -999.990 ... AR2 2020 02 06 12 40 13 36.6070 -97.4890 374.00 314.00 60.00 469787 SGP 2020 01 02 20 00 00 5765-99 G co CCGG 142.810 -999.990 ... AR2 2020 02 06 12 54 33 36.6070 -97.4890 374.00 314.00 60.00 469788 SGP 2020 01 02 20 15 00 1661-99 G co CCGG 143.770 -999.990 ... AR2 2020 02 06 13 08 53 36.6070 -97.4890 374.00 314.00 60.00 469785 SGP 2020 01 02 20 15 00 5761-99 G co CCGG 143.610 -999.990 ... AR2 2020 02 06 13 23 16 36.6070 -97.4890 374.00 314.00 60.00 469786 SGP 2020 01 09 20 00 00 1819-99 G co CCGG 122.600 -999.990 ... AR2 2020 02 04 11 21 30 36.6070 -97.4890 374.00 314.00 60.00 469637 SGP 2020 01 09 20 00 00 4757-99 G co CCGG 122.450 -999.990 ... AR2 2020 02 04 11 35 50 36.6070 -97.4890 374.00 314.00 60.00 469638 SGP 2020 01 09 20 15 00 1190-99 G co CCGG 122.710 -999.990 ... AR2 2020 02 04 11 50 12 36.6070 -97.4890 374.00 314.00 60.00 469635 SGP 2020 01 09 20 15 00 4606-99 G co CCGG 122.760 -999.990 ... AR2 2020 02 04 12 04 31 36.6070 -97.4890 374.00 314.00 60.00 469636 SGP 2020 01 16 20 00 00 1740-99 G co CCGG 136.980 -999.990 ... AR2 2020 02 18 12 07 17 36.6070 -97.4890 374.00 314.00 60.00 470302 SGP 2020 01 16 20 00 00 4867-99 G co CCGG 136.940 -999.990 ... AR2 2020 02 18 12 21 39 36.6070 -97.4890 374.00 314.00 60.00 470303 SGP 2020 01 16 20 15 00 3895-99 G co CCGG 137.020 -999.990 ... AR2 2020 02 18 12 36 01 36.6070 -97.4890 374.00 314.00 60.00 470300 SGP 2020 01 16 20 15 00 5058-99 G co CCGG 137.080 -999.990 ... AR2 2020 02 18 12 50 24 36.6070 -97.4890 374.00 314.00 60.00 470301 SGP 2020 01 23 20 00 00 1288-99 G co CCGG 119.470 -999.990 ... AR2 2020 02 24 09 46 47 36.6070 -97.4890 374.00 314.00 60.00 470479 SGP 2020 01 23 20 00 00 1516-99 G co CCGG 118.660 -999.990 ... AR2 2020 02 24 10 01 09 36.6070 -97.4890 374.00 314.00 60.00 470480 SGP 2020 01 23 20 15 00 5345-99 G co CCGG 118.530 -999.990 ... AR2 2020 02 21 16 05 32 36.6070 -97.4890 374.00 314.00 60.00 470478 SGP 2020 01 23 20 15 00 71-99 G co CCGG 118.660 -999.990 ... AR2 2020 02 21 15 51 11 36.6070 -97.4890 374.00 314.00 60.00 470477 SGP 2020 01 30 20 00 00 4411-99 G co CCGG 135.890 -999.990 ... AR2 2020 02 27 10 34 33 36.6070 -97.4890 374.00 314.00 60.00 470713 SGP 2020 01 30 20 00 00 5346-99 G co CCGG 135.680 -999.990 ... AR2 2020 02 27 10 48 53 36.6070 -97.4890 374.00 314.00 60.00 470714 SGP 2020 01 30 20 10 00 2174-99 G co CCGG 134.530 -999.990 ... AR2 2020 02 27 11 03 13 36.6070 -97.4890 374.00 314.00 60.00 470715 SGP 2020 01 30 20 10 00 3495-99 G co CCGG 135.090 -999.990 ... AR2 2020 02 27 11 17 33 36.6070 -97.4890 374.00 314.00 60.00 470716 SGP 2020 02 06 20 00 00 3611-99 G co CCGG 131.180 -999.990 ... AR2 2020 03 06 09 42 41 36.6070 -97.4890 374.00 314.00 60.00 471442 SGP 2020 02 06 20 00 00 5309-99 G co CCGG 130.790 -999.990 ... AR2 2020 03 06 09 57 01 36.6070 -97.4890 374.00 314.00 60.00 471443 SGP 2020 02 06 20 10 00 1044-99 G co CCGG 131.760 -999.990 ... AR2 2020 03 06 10 11 21 36.6070 -97.4890 374.00 314.00 60.00 471444 SGP 2020 02 06 20 10 00 4330-99 G co CCGG 131.730 -999.990 ... AR2 2020 03 06 10 25 42 36.6070 -97.4890 374.00 314.00 60.00 471445 SGP 2020 02 13 20 00 00 2234-99 G co CCGG 128.920 -999.990 ... AR2 2020 03 11 10 24 25 36.6070 -97.4890 374.00 314.00 60.00 471522 SGP 2020 02 13 20 00 00 3918-99 G co CCGG 128.830 -999.990 ... AR2 2020 03 11 10 38 47 36.6070 -97.4890 374.00 314.00 60.00 471523 SGP 2020 02 13 20 15 00 1967-99 G co CCGG 128.640 -999.990 ... AR2 2020 03 11 10 53 09 36.6070 -97.4890 374.00 314.00 60.00 471524 SGP 2020 02 13 20 15 00 3560-99 G co CCGG 128.960 -999.990 ... AR2 2020 03 11 11 07 32 36.6070 -97.4890 374.00 314.00 60.00 471525 SGP 2020 02 20 20 00 00 1776-99 G co CCGG 135.010 -999.990 ... AR2 2020 03 17 12 48 44 36.6070 -97.4890 374.00 314.00 60.00 471594 SGP 2020 02 20 20 00 00 744-99 G co CCGG 135.080 -999.990 ... AR2 2020 03 17 12 34 21 36.6070 -97.4890 374.00 314.00 60.00 471595 SGP 2020 02 20 20 15 00 1663-99 G co CCGG 135.920 -999.990 ... AR2 2020 03 17 13 03 06 36.6070 -97.4890 374.00 314.00 60.00 471592 SGP 2020 02 20 20 15 00 3794-99 G co CCGG 135.770 -999.990 ... AR2 2020 03 17 13 17 27 36.6070 -97.4890 374.00 314.00 60.00 471593 SGP 2020 02 27 20 00 00 1757-99 G co CCGG 135.350 -999.990 ... AR2 2020 03 26 12 00 39 36.6070 -97.4890 374.00 314.00 60.00 472070 SGP 2020 02 27 20 00 00 5423-99 G co CCGG 135.230 -999.990 ... AR2 2020 03 26 12 15 01 36.6070 -97.4890 374.00 314.00 60.00 472071 SGP 2020 02 27 20 15 00 1422-99 G co CCGG 135.060 -999.990 ... AR2 2020 03 26 12 29 24 36.6070 -97.4890 374.00 314.00 60.00 472068 SGP 2020 02 27 20 15 00 3099-99 G co CCGG 135.220 -999.990 ... AR2 2020 03 26 12 43 49 36.6070 -97.4890 374.00 314.00 60.00 472069 SGP 2020 03 05 20 00 00 3190-99 G co CCGG 127.770 -999.990 ... AR2 2020 03 31 12 52 42 36.6070 -97.4890 374.00 314.00 60.00 472252 SGP 2020 03 05 20 00 00 4158-99 G co CCGG 127.580 -999.990 ... AR2 2020 03 31 13 07 03 36.6070 -97.4890 374.00 314.00 60.00 472253 SGP 2020 03 05 20 15 00 1829-99 G co CCGG 127.230 -999.990 ... AR2 2020 03 31 12 23 54 36.6070 -97.4890 374.00 314.00 60.00 472254 SGP 2020 03 05 20 15 00 4473-99 G co CCGG 126.940 -999.990 ... AR2 2020 03 31 12 38 20 36.6070 -97.4890 374.00 314.00 60.00 472255 SGP 2020 03 12 19 00 00 2857-99 G co CCGG 139.280 -999.990 ... AR2 2020 04 07 13 49 32 36.6070 -97.4890 374.00 314.00 60.00 472744 SGP 2020 03 12 19 00 00 930-99 G co CCGG 139.160 -999.990 ... AR2 2020 04 07 13 35 10 36.6070 -97.4890 374.00 314.00 60.00 472745 SGP 2020 03 12 19 10 00 5185-99 G co CCGG 142.200 -999.990 ... AR2 2020 04 07 14 03 53 36.6070 -97.4890 374.00 314.00 60.00 472743 SGP 2020 03 19 19 00 00 1375-99 G co CCGG 113.210 -999.990 ... AR2 2020 04 06 12 25 57 36.6070 -97.4890 374.00 314.00 60.00 472622 SGP 2020 03 19 19 00 00 2502-99 G co CCGG 113.150 -999.990 ... AR2 2020 04 06 12 40 21 36.6070 -97.4890 374.00 314.00 60.00 472623 SGP 2020 03 19 19 10 00 1575-99 G co CCGG 112.650 -999.990 ... AR2 2020 04 06 11 57 11 36.6070 -97.4890 374.00 314.00 60.00 472620 SGP 2020 03 19 19 10 00 5887-99 G co CCGG 112.500 -999.990 ... AR2 2020 04 06 12 11 34 36.6070 -97.4890 374.00 314.00 60.00 472621 SGP 2020 03 24 19 00 00 4530-99 G co CCGG 135.840 -999.990 ... AR2 2020 05 19 11 48 27 36.6070 -97.4890 374.00 314.00 60.00 474473 SGP 2020 03 24 19 00 00 763-99 G co CCGG 136.210 -999.990 ... AR2 2020 05 19 11 34 06 36.6070 -97.4890 374.00 314.00 60.00 474472 SGP 2020 03 24 19 15 00 4297-99 G co CCGG 137.750 -999.990 ... AR2 2020 05 19 12 02 48 36.6070 -97.4890 374.00 314.00 60.00 474468 SGP 2020 03 24 19 15 00 4389-99 G co CCGG 138.640 -999.990 ... AR2 2020 05 19 12 17 17 36.6070 -97.4890 374.00 314.00 60.00 474469 SGP 2020 04 02 19 00 00 1278-99 G co CCGG 149.380 -999.990 ... AR2 2020 05 19 13 00 21 36.6070 -97.4890 374.00 314.00 60.00 474474 SGP 2020 04 02 19 00 00 2956-99 G co CCGG 148.880 -999.990 ... AR2 2020 05 19 13 14 42 36.6070 -97.4890 374.00 314.00 60.00 474470 SGP 2020 04 02 19 15 00 2957-99 G co CCGG 149.420 -999.990 ... AR2 2020 05 19 12 31 38 36.6070 -97.4890 374.00 314.00 60.00 474475 SGP 2020 04 02 19 15 00 3926-99 G co CCGG 149.670 -999.990 ... AR2 2020 05 19 12 46 00 36.6070 -97.4890 374.00 314.00 60.00 474471 SGP 2020 05 07 19 00 00 2321-99 G co CCGG 147.240 -999.990 ... AR2 2020 05 20 11 04 37 36.6070 -97.4890 374.00 314.00 60.00 474458 SGP 2020 05 07 19 00 00 2782-99 G co CCGG 147.310 -999.990 ... AR2 2020 05 20 11 18 56 36.6070 -97.4890 374.00 314.00 60.00 474459 SGP 2020 05 07 19 10 00 3913-99 G co CCGG 146.050 -999.990 ... AR2 2020 05 20 10 35 57 36.6070 -97.4890 374.00 314.00 60.00 474456 SGP 2020 05 07 19 10 00 5897-99 G co CCGG 145.770 -999.990 ... AR2 2020 05 20 10 50 16 36.6070 -97.4890 374.00 314.00 60.00 474457 SGP 2020 05 14 19 00 00 2574-99 G co CCGG 123.990 -999.990 ... AR2 2020 06 04 16 31 16 36.6070 -97.4890 374.00 314.00 60.00 474984 SGP 2020 05 14 19 00 00 3862-99 G co CCGG 123.250 -999.990 ... AR2 2020 06 04 16 45 36 36.6070 -97.4890 374.00 314.00 60.00 474985 SGP 2020 05 14 19 10 00 5001-99 G co CCGG 124.090 -999.990 ... AR2 2020 06 04 16 59 56 36.6070 -97.4890 374.00 314.00 60.00 474986 SGP 2020 05 14 19 10 00 5205-99 G co CCGG 123.690 -999.990 ... AR2 2020 06 04 17 14 16 36.6070 -97.4890 374.00 314.00 60.00 474987 SGP 2020 05 21 19 00 00 532-99 G co CCGG 158.790 -999.990 ... AR2 2020 06 18 10 12 05 36.6070 -97.4890 374.00 314.00 60.00 475518 SGP 2020 05 21 19 00 00 546-99 G co CCGG 158.340 -999.990 ... AR2 2020 06 18 10 26 27 36.6070 -97.4890 374.00 314.00 60.00 475519 SGP 2020 05 21 19 10 00 4046-99 G co CCGG 157.610 -999.990 ... AR2 2020 06 17 16 36 32 36.6070 -97.4890 374.00 314.00 60.00 475524 SGP 2020 05 21 19 10 00 5625-99 G co CCGG 157.540 -999.990 ... AR2 2020 06 17 16 50 57 36.6070 -97.4890 374.00 314.00 60.00 475525 SGP 2020 05 28 19 00 00 1091-99 G co CCGG 123.470 -999.990 ... AR2 2020 06 19 11 19 42 36.6070 -97.4890 374.00 314.00 60.00 475905 SGP 2020 05 28 19 00 00 5666-99 G co CCGG 123.180 -999.990 ... AR2 2020 06 19 11 34 04 36.6070 -97.4890 374.00 314.00 60.00 475906 SGP 2020 05 28 19 10 00 1138-99 G co CCGG 122.820 -999.990 ... AR2 2020 06 19 11 05 22 36.6070 -97.4890 374.00 314.00 60.00 475904 SGP 2020 05 28 19 10 00 337-99 G co CCGG 123.010 -999.990 ... AR2 2020 06 19 10 51 03 36.6070 -97.4890 374.00 314.00 60.00 475903 SGP 2020 06 04 19 00 00 1222-99 G co CCGG 133.700 -999.990 ... AR2 2020 07 06 16 53 08 36.6070 -97.4890 374.00 314.00 60.00 476289 SGP 2020 06 04 19 00 00 927-99 G co CCGG 133.880 -999.990 ... AR2 2020 07 06 16 38 45 36.6070 -97.4890 374.00 314.00 60.00 476288 SGP 2020 06 11 19 00 00 2678-99 G co CCGG 112.460 -999.990 ... AR2 2020 07 08 12 40 48 36.6070 -97.4890 374.00 314.00 60.00 476301 SGP 2020 06 11 19 00 00 4352-99 G co CCGG 111.890 -999.990 ... AR2 2020 07 08 12 55 08 36.6070 -97.4890 374.00 314.00 60.00 476302 SGP 2020 06 18 19 00 00 2173-99 G co CCGG 128.980 -999.990 ... AR2 2020 07 20 10 15 55 36.6070 -97.4890 374.00 314.00 60.00 476852 SGP 2020 06 18 19 00 00 2319-99 G co CCGG 128.260 -999.990 ... AR2 2020 07 20 10 30 21 36.6070 -97.4890 374.00 314.00 60.00 476853 SGP 2020 06 25 19 00 00 2852-99 G co CCGG 133.110 -999.990 ... AR2 2020 07 20 09 14 58 36.6070 -97.4890 374.00 314.00 60.00 476850 SGP 2020 06 25 19 00 00 3880-99 G co CCGG 132.900 -999.990 ... AR2 2020 07 20 09 29 23 36.6070 -97.4890 374.00 314.00 60.00 476851 SGP 2020 07 02 19 00 00 2595-99 G co CCGG 111.000 -999.990 ... AR2 2020 07 30 11 20 49 36.6070 -97.4890 374.00 314.00 60.00 477771 SGP 2020 07 02 19 00 00 2803-99 G co CCGG 111.460 -999.990 ... AR2 2020 07 30 11 35 10 36.6070 -97.4890 374.00 314.00 60.00 477772 SGP 2020 07 09 19 00 00 1254-99 G co CCGG 105.990 -999.990 ... AR2 2020 07 30 11 06 23 36.6070 -97.4890 374.00 314.00 60.00 477769 SGP 2020 07 09 19 00 00 946-99 G co CCGG 105.920 -999.990 ... AR2 2020 07 30 10 51 59 36.6070 -97.4890 374.00 314.00 60.00 477770 SGP 2020 07 16 19 00 00 2354-99 G co CCGG 104.340 -999.990 ... AR2 2020 08 04 15 56 10 36.6070 -97.4890 374.00 314.00 60.00 478006 SGP 2020 07 16 19 00 00 4495-99 G co CCGG 104.270 -999.990 ... AR2 2020 08 04 16 10 32 36.6070 -97.4890 374.00 314.00 60.00 478007 SGP 2020 07 23 19 00 00 4739-99 G co CCGG 104.810 -999.990 ... AR2 2020 08 04 15 41 48 36.6070 -97.4890 374.00 314.00 60.00 478008 SGP 2020 07 23 19 00 00 784-99 G co CCGG 104.610 -999.990 ... AR2 2020 08 04 15 27 26 36.6070 -97.4890 374.00 314.00 60.00 478009 SGP 2020 07 30 19 00 00 1754-99 G co CCGG 99.760 -999.990 ... AR2 2020 08 18 15 02 48 36.6070 -97.4890 374.00 314.00 60.00 478696 SGP 2020 07 30 19 00 00 359-99 G co CCGG 99.780 -999.990 ... AR2 2020 08 18 14 48 22 36.6070 -97.4890 374.00 314.00 60.00 478697 SGP 2020 08 06 19 00 00 3631-99 G co CCGG 174.910 -999.990 ... AR2 2020 08 18 15 17 12 36.6070 -97.4890 374.00 314.00 60.00 478694 SGP 2020 08 06 19 00 00 4656-99 G co CCGG 174.740 -999.990 ... AR2 2020 08 18 15 31 34 36.6070 -97.4890 374.00 314.00 60.00 478695 SGP 2020 08 13 19 00 00 3614-99 G co CCGG 106.640 -999.990 ... AR2 2020 09 01 15 56 34 36.6070 -97.4890 374.00 314.00 60.00 479361 SGP 2020 08 13 19 00 00 518-99 G co CCGG 106.820 -999.990 ... AR2 2020 09 01 15 42 01 36.6070 -97.4890 374.00 314.00 60.00 479362 SGP 2020 08 20 19 00 00 2396-99 G co CCGG 132.670 -999.990 ... AR2 2020 09 01 15 12 44 36.6070 -97.4890 374.00 314.00 60.00 479359 SGP 2020 08 20 19 00 00 3240-99 G co CCGG 132.230 -999.990 ... AR2 2020 09 01 15 27 25 36.6070 -97.4890 374.00 314.00 60.00 479360 SGP 2020 08 27 19 00 00 1489-99 G co CCGG 97.860 -999.990 ... AR2 2020 09 24 11 04 44 36.6070 -97.4890 374.00 314.00 60.00 479861 SGP 2020 08 27 19 00 00 788-99 G co CCGG 97.770 -999.990 ... AR2 2020 09 24 10 50 19 36.6070 -97.4890 374.00 314.00 60.00 479860 SGP 2020 09 03 19 00 00 2331-99 G co CCGG 120.770 -999.990 ... AR2 2020 09 24 10 21 37 36.6070 -97.4890 374.00 314.00 60.00 479858 SGP 2020 09 03 19 00 00 4994-99 G co CCGG 120.630 -999.990 ... AR2 2020 09 24 10 35 57 36.6070 -97.4890 374.00 314.00 60.00 479859 SGP 2020 09 10 19 00 00 4476-99 G co CCGG 110.030 -999.990 ... AR2 2020 10 05 11 49 35 36.6070 -97.4890 374.00 314.00 60.00 480429 SGP 2020 09 10 19 00 00 500-99 G co CCGG 110.060 -999.990 ... AR2 2020 10 05 11 35 11 36.6070 -97.4890 374.00 314.00 60.00 480430 SGP 2020 09 17 19 00 00 4310-99 G co CCGG 178.950 -999.990 ... AR2 2020 10 05 11 06 35 36.6070 -97.4890 374.00 314.00 60.00 480427 SGP 2020 09 17 19 00 00 5626-99 G co CCGG 178.900 -999.990 ... AR2 2020 10 05 11 20 53 36.6070 -97.4890 374.00 314.00 60.00 480428 SGP 2020 09 24 19 00 00 1869-99 G co CCGG 127.640 -999.990 ... AR2 2020 10 14 13 32 37 36.6070 -97.4890 374.00 314.00 60.00 480740 SGP 2020 09 24 19 00 00 2690-99 G co CCGG 127.210 -999.990 ... AR2 2020 10 14 13 46 55 36.6070 -97.4890 374.00 314.00 60.00 480741 SGP 2020 10 01 19 00 00 3525-99 G co CCGG 113.080 -999.990 ... AR2 2020 10 14 12 35 25 36.6070 -97.4890 374.00 314.00 60.00 480742 SGP 2020 10 01 19 00 00 3554-99 G co CCGG 113.000 -999.990 ... AR2 2020 10 14 12 49 44 36.6070 -97.4890 374.00 314.00 60.00 480743 SGP 2020 10 08 19 00 00 3767-99 G co CCGG 162.540 -999.990 ... AR2 2020 10 29 10 42 27 36.6070 -97.4890 374.00 314.00 60.00 481258 SGP 2020 10 08 19 00 00 3930-99 G co CCGG 162.790 -999.990 ... AR2 2020 10 29 10 56 48 36.6070 -97.4890 374.00 314.00 60.00 481259 SGP 2020 10 15 19 00 00 2354-99 G co CCGG 126.470 -999.990 ... AR2 2020 10 29 11 25 26 36.6070 -97.4890 374.00 314.00 60.00 481257 SGP 2020 10 15 19 00 00 850-99 G co CCGG 126.680 -999.990 ... AR2 2020 10 29 11 11 07 36.6070 -97.4890 374.00 314.00 60.00 481256 SGP 2020 10 22 19 00 00 1916-99 G co CCGG 104.350 -999.990 ... AR2 2020 11 16 16 48 32 36.6070 -97.4890 374.00 314.00 60.00 482027 SGP 2020 10 22 19 00 00 928-99 G co CCGG 104.480 -999.990 ... AR2 2020 11 16 16 34 14 36.6070 -97.4890 374.00 314.00 60.00 482026 SGP 2020 10 29 19 00 00 5631-99 G co CCGG 121.680 -999.990 ... AR2 2020 11 16 16 19 55 36.6070 -97.4890 374.00 314.00 60.00 482029 SGP 2020 10 29 19 00 00 901-99 G co CCGG 121.780 -999.990 ... AR2 2020 11 16 16 05 37 36.6070 -97.4890 374.00 314.00 60.00 482028 SGP 2020 11 05 20 00 00 2940-99 G co CCGG 144.810 -999.990 ... AR2 2020 11 23 13 29 24 36.6070 -97.4890 374.00 314.00 60.00 482383 SGP 2020 11 05 20 00 00 3952-99 G co CCGG 145.150 -999.990 ... AR2 2020 11 23 13 43 43 36.6070 -97.4890 374.00 314.00 60.00 482384 SGP 2020 11 12 20 00 00 3156-99 G co CCGG 155.610 -999.990 ... AR2 2020 11 23 13 00 38 36.6070 -97.4890 374.00 314.00 60.00 482385 SGP 2020 11 12 20 00 00 5053-99 G co CCGG 155.350 -999.990 ... AR2 2020 11 23 13 15 03 36.6070 -97.4890 374.00 314.00 60.00 482386 SGP 2020 11 19 20 00 00 3820-99 G co CCGG 140.180 -999.990 ... AR2 2020 12 09 14 20 10 36.6070 -97.4890 374.00 314.00 60.00 483023 SGP 2020 11 19 20 00 00 4305-99 G co CCGG 140.060 -999.990 ... AR2 2020 12 09 14 34 29 36.6070 -97.4890 374.00 314.00 60.00 483024 SGP 2020 12 03 20 00 00 634-99 G co CCGG 129.450 -999.990 ... AR2 2020 12 09 13 51 33 36.6070 -97.4890 374.00 314.00 60.00 483021 SGP 2020 12 03 20 00 00 654-99 G co CCGG 129.600 -999.990 ... AR2 2020 12 09 14 05 51 36.6070 -97.4890 374.00 314.00 60.00 483022 SGP 2020 12 10 20 00 00 2360-99 G co CCGG 141.130 -999.990 ... AR2 2021 01 05 14 51 42 36.6070 -97.4890 374.00 314.00 60.00 484019 SGP 2020 12 10 20 00 00 2531-99 G co CCGG 141.100 -999.990 ... AR2 2021 01 05 15 06 00 36.6070 -97.4890 374.00 314.00 60.00 484020 SGP 2020 12 17 20 00 00 1040-99 G co CCGG 149.930 -999.990 ... AR2 2021 01 05 15 20 17 36.6070 -97.4890 374.00 314.00 60.00 484017 SGP 2020 12 17 20 00 00 2901-99 G co CCGG 150.280 -999.990 ... AR2 2021 01 05 15 34 33 36.6070 -97.4890 374.00 314.00 60.00 484018 SGP 2020 12 24 20 00 00 1773-99 G co CCGG 128.540 -999.990 ... AR2 2021 01 12 15 10 19 36.6070 -97.4890 374.00 314.00 60.00 484347 SGP 2020 12 24 20 00 00 4199-99 G co CCGG 128.410 -999.990 ... AR2 2021 01 12 15 24 39 36.6070 -97.4890 374.00 314.00 60.00 484348 SGP 2020 12 31 20 00 00 3070-99 G co CCGG 132.450 -999.990 ... AR2 2021 01 12 15 53 18 36.6070 -97.4890 374.00 314.00 60.00 484425 SGP 2020 12 31 20 00 00 594-99 G co CCGG 132.470 -999.990 ... AR2 2021 01 12 15 38 59 36.6070 -97.4890 374.00 314.00 60.00 484426