# number_of_header_lines: 71 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO CCGG (Individual Flasks) # contact_name: Gabrielle Petron # contact_telephone: (303) 497-4890 # contact_email: Gabrielle.Petron@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: NOAA Earth System Research Laboratory, Global # collaborator_name: Monitoring Division [NOAA ESRL GMD] # collaborator_url: http://www.esrl.noaa.gov/gmd # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: smo # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2020-12-31 # description_creation-time: 2021-07-29 08:19:19 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number SMO 1988 09 22 22 40 00 2008-87 P co CCGG 78.700 -999.990 R.. R2 1988 09 29 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122351 SMO 1988 09 22 22 40 00 2008-87 P co CCGG 78.880 -999.990 R.. R2 1988 09 29 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122351 SMO 1988 09 29 22 01 00 2042-87 P co CCGG 68.580 -999.990 R.. R2 1988 10 04 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122359 SMO 1988 10 06 22 08 00 2045-87 P co CCGG 77.100 -999.990 R.. R2 1988 10 19 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122366 SMO 1988 10 06 22 08 00 2045-87 P co CCGG 78.390 -999.990 R.. R2 1988 10 19 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122366 SMO 1988 10 20 23 12 00 2009-62 P co CCGG 75.760 -999.990 R.. R2 1988 11 01 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122383 SMO 1988 10 20 23 12 00 2009-62 P co CCGG 76.960 -999.990 R.. R2 1988 11 01 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122383 SMO 1988 10 20 23 12 00 2009-62 P co CCGG 77.830 -999.990 R.. R2 1988 11 01 08 02 00 -14.2500 -170.5700 45.00 42.00 3.00 122383 SMO 1988 11 03 23 04 00 2001-62 P co CCGG 80.450 -999.990 R.. R2 1988 11 20 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122403 SMO 1988 11 03 23 04 00 2001-62 P co CCGG 82.680 -999.990 R.. R2 1988 11 20 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122403 SMO 1988 11 10 21 53 00 2023-62 P co CCGG 90.730 -999.990 R.. R2 1988 11 20 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122411 SMO 1988 11 10 21 53 00 2023-62 P co CCGG 91.090 -999.990 R.. R2 1988 11 20 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122411 SMO 1988 11 18 22 23 00 2015-62 P co CCGG 72.630 -999.990 R.. R2 1988 12 03 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122417 SMO 1988 11 18 22 23 00 2015-62 P co CCGG 73.480 -999.990 R.. R2 1988 12 03 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122417 SMO 1988 11 23 23 16 00 2021-62 P co CCGG 66.740 -999.990 R.. R2 1988 12 03 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122427 SMO 1988 11 23 23 16 00 2021-62 P co CCGG 68.260 -999.990 R.. R2 1988 12 03 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122427 SMO 1988 12 01 22 22 00 2007-62 P co CCGG 67.690 -999.990 R.. R2 1988 12 13 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122435 SMO 1988 12 01 22 22 00 2007-62 P co CCGG 68.250 -999.990 R.. R2 1988 12 13 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122435 SMO 1988 12 01 22 22 00 2007-62 P co CCGG 69.380 -999.990 R.. R2 1988 12 13 08 02 00 -14.2500 -170.5700 45.00 42.00 3.00 122435 SMO 1988 12 09 00 36 00 2017-62 P co CCGG 64.820 -999.990 R.. R2 1988 12 13 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122443 SMO 1988 12 09 00 36 00 2017-62 P co CCGG 65.720 -999.990 R.. R2 1988 12 13 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122443 SMO 1988 12 16 23 29 00 2019-62 P co CCGG 67.020 -999.990 R.. R2 1988 12 21 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122451 SMO 1988 12 16 23 29 00 2019-62 P co CCGG 67.550 -999.990 R.. R2 1988 12 21 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122451 SMO 1988 12 22 22 23 00 2009-62 P co CCGG 60.470 -999.990 R.. R2 1989 01 05 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122457 SMO 1988 12 22 22 23 00 2009-62 P co CCGG 61.550 -999.990 R.. R2 1989 01 05 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122457 SMO 1989 01 05 22 12 00 2025-62 P co CCGG 76.600 -999.990 S.. R2 1989 01 14 16 48 00 -14.2500 -170.5700 45.00 42.00 3.00 122463 SMO 1989 01 05 22 12 00 2025-62 P co CCGG 76.010 -999.990 S.. R2 1989 01 14 17 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122463 SMO 1989 01 05 22 12 00 2025-62 P co CCGG 77.070 -999.990 S.. R2 1989 01 14 17 12 00 -14.2500 -170.5700 45.00 42.00 3.00 122463 SMO 1989 01 20 00 36 00 2001-62 P co CCGG 61.770 -999.990 R.. R2 1989 01 27 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122477 SMO 1989 01 28 01 51 00 2285-62 P co CCGG 65.950 -999.990 S.. R2 1989 02 10 08 54 00 -14.2500 -170.5700 45.00 42.00 3.00 122486 SMO 1989 01 28 01 51 00 2285-62 P co CCGG 68.140 -999.990 S.. R2 1989 02 10 09 02 00 -14.2500 -170.5700 45.00 42.00 3.00 122486 SMO 1989 02 09 23 22 00 2135-62 P co CCGG 72.510 -999.990 S.. R2 1989 02 20 09 23 00 -14.2500 -170.5700 45.00 42.00 3.00 122501 SMO 1989 02 16 22 25 00 2021-62 P co CCGG 88.950 -999.990 S.. R2 1989 02 27 07 51 00 -14.2500 -170.5700 45.00 42.00 3.00 122507 SMO 1989 02 16 22 25 00 2021-62 P co CCGG 64.090 -999.990 S.. R2 1989 02 27 08 05 00 -14.2500 -170.5700 45.00 42.00 3.00 122507 SMO 1989 02 16 22 25 00 2021-62 P co CCGG 69.180 -999.990 S.. R2 1989 02 27 08 12 00 -14.2500 -170.5700 45.00 42.00 3.00 122507 SMO 1989 03 03 04 10 00 2049-62 P co CCGG 66.580 -999.990 S.. R2 1989 03 13 16 38 00 -14.2500 -170.5700 45.00 42.00 3.00 122523 SMO 1989 03 03 04 10 00 2049-62 P co CCGG 77.930 -999.990 S.. R2 1989 03 13 16 57 00 -14.2500 -170.5700 45.00 42.00 3.00 122523 SMO 1989 03 03 04 10 00 2049-62 P co CCGG -999.990 -999.990 *.. R2 1989 03 13 17 03 00 -14.2500 -170.5700 45.00 42.00 3.00 122523 SMO 1989 03 17 07 03 00 2271-62 P co CCGG 60.570 -999.990 S.< R2 1989 03 29 07 44 00 -14.2500 -170.5700 45.00 42.00 3.00 122531 SMO 1989 03 17 07 03 00 2271-62 P co CCGG -999.990 -999.990 *.. R2 1989 03 29 07 57 00 -14.2500 -170.5700 45.00 42.00 3.00 122531 SMO 1989 03 17 07 03 00 2271-62 P co CCGG 47.480 -999.990 S.. R2 1989 03 29 08 11 00 -14.2500 -170.5700 45.00 42.00 3.00 122531 SMO 1989 03 17 07 03 00 2271-62 P co CCGG -999.990 -999.990 *.. R2 1989 03 29 08 24 00 -14.2500 -170.5700 45.00 42.00 3.00 122531 SMO 1989 03 17 07 03 00 2271-62 P co CCGG 61.290 -999.990 S.. R2 1989 03 29 08 37 00 -14.2500 -170.5700 45.00 42.00 3.00 122531 SMO 1989 03 24 22 49 00 3128-62 T co CCGG -999.990 -999.990 *.. R2 1989 04 18 14 56 00 -14.2500 -170.5700 44.00 42.00 2.00 122534 SMO 1989 03 24 22 49 00 3128-62 T co CCGG -999.990 -999.990 *.. R2 1989 04 18 15 09 00 -14.2500 -170.5700 44.00 42.00 2.00 122534 SMO 1989 03 24 22 49 00 3128-62 T co CCGG 59.640 -999.990 ... R2 1989 04 18 15 21 00 -14.2500 -170.5700 44.00 42.00 2.00 122534 SMO 1989 03 24 22 49 00 3128-62 T co CCGG 58.320 -999.990 ... R2 1989 04 18 15 27 00 -14.2500 -170.5700 44.00 42.00 2.00 122534 SMO 1989 03 24 23 00 00 2001-64 P co CCGG 60.530 -999.990 Z.. R2 1989 04 11 14 41 00 -14.2500 -170.5700 45.00 42.00 3.00 122535 SMO 1989 03 24 23 00 00 2001-64 P co CCGG 56.780 -999.990 Z.. R2 1989 04 11 14 51 00 -14.2500 -170.5700 45.00 42.00 3.00 122535 SMO 1989 03 24 23 00 00 2001-64 P co CCGG 63.990 -999.990 Z.. R2 1989 04 11 15 09 00 -14.2500 -170.5700 45.00 42.00 3.00 122535 SMO 1989 04 02 03 50 00 3130-62 T co CCGG 71.760 -999.990 ... R2 1989 04 18 15 02 00 -14.2500 -170.5700 44.00 42.00 2.00 122544 SMO 1989 04 02 03 50 00 3130-62 T co CCGG 68.260 -999.990 ... R2 1989 04 18 15 15 00 -14.2500 -170.5700 44.00 42.00 2.00 122544 SMO 1989 04 02 04 00 00 2135-62 P co CCGG 72.370 -999.990 Z.. R2 1989 04 17 06 33 00 -14.2500 -170.5700 45.00 42.00 3.00 122545 SMO 1989 04 02 04 00 00 2135-62 P co CCGG 68.520 -999.990 Z.. R2 1989 04 17 06 46 00 -14.2500 -170.5700 45.00 42.00 3.00 122545 SMO 1989 04 07 01 43 00 2027-64 P co CCGG -999.990 -999.990 *.. R2 1989 04 17 15 44 00 -14.2500 -170.5700 45.00 42.00 3.00 122551 SMO 1989 04 07 01 43 00 2027-64 P co CCGG 70.070 -999.990 ... R2 1989 04 17 15 56 00 -14.2500 -170.5700 45.00 42.00 3.00 122551 SMO 1989 04 18 00 45 00 2241-62 P co CCGG 65.750 -999.990 ... R2 1989 05 06 08 35 00 -14.2500 -170.5700 45.00 42.00 3.00 122559 SMO 1989 04 18 00 45 00 2241-62 P co CCGG 62.910 -999.990 ... R2 1989 05 06 08 48 00 -14.2500 -170.5700 45.00 42.00 3.00 122559 SMO 1989 05 03 00 29 00 2013-64 P co CCGG 61.170 -999.990 Z.. R2 1989 05 11 14 22 00 -14.2500 -170.5700 45.00 42.00 3.00 122561 SMO 1989 05 03 00 29 00 2013-64 P co CCGG 65.900 -999.990 ... R2 1989 05 11 14 36 00 -14.2500 -170.5700 45.00 42.00 3.00 122561 SMO 1989 05 03 00 29 00 2013-64 P co CCGG 66.690 -999.990 ... R2 1989 05 11 14 49 00 -14.2500 -170.5700 45.00 42.00 3.00 122561 SMO 1989 05 08 22 08 00 3138-62 T co CCGG 71.050 -999.990 R.. R2 1990 06 01 08 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122570 SMO 1989 05 08 22 08 00 3138-62 T co CCGG 72.390 -999.990 R.. R2 1990 06 01 08 01 00 -14.2500 -170.5700 44.00 42.00 2.00 122570 SMO 1989 05 08 22 20 00 2113-62 P co CCGG 85.260 -999.990 .X. R2 1989 05 20 09 18 00 -14.2500 -170.5700 45.00 42.00 3.00 122573 SMO 1989 05 08 22 20 00 2113-62 P co CCGG 85.290 -999.990 .X. R2 1989 05 20 09 31 00 -14.2500 -170.5700 45.00 42.00 3.00 122573 SMO 1989 05 08 22 20 00 2113-62 P co CCGG 84.270 -999.990 .X. R2 1989 05 20 09 49 00 -14.2500 -170.5700 45.00 42.00 3.00 122573 SMO 1989 05 18 23 07 00 3136-62 T co CCGG 54.910 -999.990 R.. R2 1990 06 07 08 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122582 SMO 1989 05 18 23 07 00 3136-62 T co CCGG 58.420 -999.990 R.. R2 1990 06 07 08 01 00 -14.2500 -170.5700 44.00 42.00 2.00 122582 SMO 1989 05 18 23 14 00 2123-62 P co CCGG 66.150 -999.990 Z.. R2 1989 06 01 07 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122583 SMO 1989 05 18 23 14 00 2123-62 P co CCGG 30.410 -999.990 Z.C R2 1989 06 01 07 14 00 -14.2500 -170.5700 45.00 42.00 3.00 122583 SMO 1989 05 18 23 14 00 2123-62 P co CCGG 40.590 -999.990 Z.. R2 1989 06 01 07 27 00 -14.2500 -170.5700 45.00 42.00 3.00 122583 SMO 1989 05 25 21 00 00 3142-62 T co CCGG 56.010 -999.990 R.. R2 1990 06 07 08 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122586 SMO 1989 05 25 21 00 00 3142-62 T co CCGG 57.220 -999.990 R.. R2 1990 06 07 08 01 00 -14.2500 -170.5700 44.00 42.00 2.00 122586 SMO 1989 05 25 21 13 00 2025-64 P co CCGG 69.410 -999.990 ... R2 1989 06 07 07 09 00 -14.2500 -170.5700 45.00 42.00 3.00 122589 SMO 1989 05 25 21 13 00 2025-64 P co CCGG 63.720 -999.990 Z.. R2 1989 06 07 07 23 00 -14.2500 -170.5700 45.00 42.00 3.00 122589 SMO 1989 05 25 21 13 00 2025-64 P co CCGG 69.750 -999.990 ... R2 1989 06 07 07 37 00 -14.2500 -170.5700 45.00 42.00 3.00 122589 SMO 1989 06 02 03 55 00 3140-62 T co CCGG 56.850 -999.990 ... R2 1989 06 09 16 41 00 -14.2500 -170.5700 44.00 42.00 2.00 122596 SMO 1989 06 02 03 55 00 3140-62 T co CCGG -999.990 -999.990 *.. R2 1989 06 09 16 53 00 -14.2500 -170.5700 44.00 42.00 2.00 122596 SMO 1989 06 02 03 55 00 3140-62 T co CCGG 59.110 -999.990 ... R2 1989 06 09 17 05 00 -14.2500 -170.5700 44.00 42.00 2.00 122596 SMO 1989 06 02 04 03 00 2277-62 P co CCGG 66.450 -999.990 Z.. R2 1989 06 09 16 12 00 -14.2500 -170.5700 45.00 42.00 3.00 122597 SMO 1989 06 02 04 03 00 2277-62 P co CCGG 63.370 -999.990 Z.. R2 1989 06 09 16 24 00 -14.2500 -170.5700 45.00 42.00 3.00 122597 SMO 1989 06 08 23 22 00 3144-62 T co CCGG 54.520 -999.990 ... R2 1989 06 26 09 52 00 -14.2500 -170.5700 44.00 42.00 2.00 122601 SMO 1989 06 08 23 22 00 3144-62 T co CCGG 52.530 -999.990 ... R2 1989 06 26 10 07 00 -14.2500 -170.5700 44.00 42.00 2.00 122601 SMO 1989 06 08 23 39 00 2017-64 P co CCGG 57.570 -999.990 Z.. R2 1989 06 17 10 08 00 -14.2500 -170.5700 45.00 42.00 3.00 122604 SMO 1989 06 08 23 39 00 2017-64 P co CCGG 64.530 -999.990 Z.. R2 1989 06 17 10 14 00 -14.2500 -170.5700 45.00 42.00 3.00 122604 SMO 1989 06 08 23 39 00 2017-64 P co CCGG 72.170 -999.990 Z.. R2 1989 06 17 10 20 00 -14.2500 -170.5700 45.00 42.00 3.00 122604 SMO 1989 06 22 22 32 00 3146-60 T co CCGG 63.190 -999.990 W.. R2 1989 07 12 08 12 00 -14.2500 -170.5700 44.00 42.00 2.00 122616 SMO 1989 06 22 22 32 00 3146-60 T co CCGG 60.700 -999.990 W.. R2 1989 07 12 08 26 00 -14.2500 -170.5700 44.00 42.00 2.00 122616 SMO 1989 06 22 22 32 00 3146-60 T co CCGG 62.060 -999.990 W.. R2 1989 07 12 08 40 00 -14.2500 -170.5700 44.00 42.00 2.00 122616 SMO 1989 06 22 22 51 00 2281-62 P co CCGG 55.530 -999.990 ... R2 1989 07 08 10 09 00 -14.2500 -170.5700 45.00 42.00 3.00 122619 SMO 1989 06 22 22 51 00 2281-62 P co CCGG 57.110 -999.990 ... R2 1989 07 08 10 23 00 -14.2500 -170.5700 45.00 42.00 3.00 122619 SMO 1989 06 22 22 51 00 2281-62 P co CCGG 56.260 -999.990 ... R2 1989 07 08 10 38 00 -14.2500 -170.5700 45.00 42.00 3.00 122619 SMO 1989 06 29 01 03 00 3150-62 T co CCGG 51.140 -999.990 ... R2 1989 07 12 08 19 00 -14.2500 -170.5700 44.00 42.00 2.00 122626 SMO 1989 06 29 01 03 00 3150-62 T co CCGG 51.520 -999.990 ... R2 1989 07 12 08 33 00 -14.2500 -170.5700 44.00 42.00 2.00 122626 SMO 1989 06 29 01 03 00 3150-62 T co CCGG 51.790 -999.990 ... R2 1989 07 12 08 47 00 -14.2500 -170.5700 44.00 42.00 2.00 122626 SMO 1989 06 29 01 12 00 2003-64 P co CCGG 63.250 -999.990 ... R2 1989 07 08 10 03 00 -14.2500 -170.5700 45.00 42.00 3.00 122627 SMO 1989 06 29 01 12 00 2003-64 P co CCGG 65.480 -999.990 ... R2 1989 07 08 10 16 00 -14.2500 -170.5700 45.00 42.00 3.00 122627 SMO 1989 06 29 01 12 00 2003-64 P co CCGG 65.750 -999.990 ... R2 1989 07 08 10 31 00 -14.2500 -170.5700 45.00 42.00 3.00 122627 SMO 1989 07 07 20 20 00 2047-64 P co CCGG 52.980 -999.990 ... R2 1989 07 19 09 51 00 -14.2500 -170.5700 45.00 42.00 3.00 122636 SMO 1989 07 07 20 20 00 2047-64 P co CCGG 53.220 -999.990 ... R2 1989 07 19 10 05 00 -14.2500 -170.5700 45.00 42.00 3.00 122636 SMO 1989 07 13 21 56 00 3128-62 T co CCGG 60.110 -999.990 ... R2 1989 07 21 09 05 00 -14.2500 -170.5700 44.00 42.00 2.00 122641 SMO 1989 07 13 21 56 00 3128-62 T co CCGG 63.880 -999.990 ... R2 1989 07 21 09 12 00 -14.2500 -170.5700 44.00 42.00 2.00 122641 SMO 1989 07 13 22 08 00 2037-64 P co CCGG 61.830 -999.990 ... R2 1989 07 21 08 04 00 -14.2500 -170.5700 45.00 42.00 3.00 122642 SMO 1989 07 13 22 08 00 2037-64 P co CCGG 63.080 -999.990 ... R2 1989 07 21 08 18 00 -14.2500 -170.5700 45.00 42.00 3.00 122642 SMO 1989 07 21 01 52 00 3132-62 T co CCGG 57.250 -999.990 ..< R2 1989 08 06 10 06 00 -14.2500 -170.5700 44.00 42.00 2.00 122647 SMO 1989 07 21 02 03 00 2005-62 P co CCGG 63.680 -999.990 ... R2 1989 08 02 07 45 00 -14.2500 -170.5700 45.00 42.00 3.00 122650 SMO 1989 07 21 02 03 00 2005-62 P co CCGG 60.610 -999.990 ... R2 1989 08 02 07 58 00 -14.2500 -170.5700 45.00 42.00 3.00 122650 SMO 1989 07 21 02 03 00 2005-62 P co CCGG 61.750 -999.990 ... R2 1989 08 02 08 11 00 -14.2500 -170.5700 45.00 42.00 3.00 122650 SMO 1989 07 28 02 29 00 3148-62 T co CCGG 62.590 -999.990 ... R2 1989 08 06 09 59 00 -14.2500 -170.5700 44.00 42.00 2.00 122655 SMO 1989 07 28 02 40 00 2051-64 P co CCGG 67.330 -999.990 ... R2 1989 08 06 07 30 00 -14.2500 -170.5700 45.00 42.00 3.00 122658 SMO 1989 08 04 02 52 00 3136-62 T co CCGG 68.200 -999.990 ... R2 1989 08 23 15 37 00 -14.2500 -170.5700 44.00 42.00 2.00 122662 SMO 1989 08 04 02 52 00 3136-62 T co CCGG 65.530 -999.990 ... R2 1989 08 23 15 48 00 -14.2500 -170.5700 44.00 42.00 2.00 122662 SMO 1989 08 04 03 01 00 2009-66 P co CCGG 60.580 -999.990 ... R2 1989 08 16 08 39 00 -14.2500 -170.5700 45.00 42.00 3.00 122665 SMO 1989 08 13 02 12 00 3138-62 T co CCGG 67.270 -999.990 ... R2 1989 08 23 15 30 00 -14.2500 -170.5700 44.00 42.00 2.00 122670 SMO 1989 08 13 02 12 00 3138-62 T co CCGG 63.370 -999.990 ... R2 1989 08 23 15 42 00 -14.2500 -170.5700 44.00 42.00 2.00 122670 SMO 1989 08 13 02 22 00 2005-66 P co CCGG 63.040 -999.990 ... R2 1989 08 23 16 13 00 -14.2500 -170.5700 45.00 42.00 3.00 122673 SMO 1989 08 13 02 22 00 2005-66 P co CCGG 65.420 -999.990 ... R2 1989 08 23 16 19 00 -14.2500 -170.5700 45.00 42.00 3.00 122673 SMO 1989 08 20 04 02 00 2281-62 P co CCGG -999.990 -999.990 *.. R2 1989 09 06 07 56 00 -14.2500 -170.5700 45.00 42.00 3.00 122680 SMO 1989 08 20 04 02 00 2281-62 P co CCGG -999.990 -999.990 *.. R2 1989 09 06 08 07 00 -14.2500 -170.5700 45.00 42.00 3.00 122680 SMO 1989 08 27 01 32 00 3142-62 T co CCGG -999.990 -999.990 *.. R2 1989 09 06 09 15 00 -14.2500 -170.5700 44.00 42.00 2.00 122685 SMO 1989 08 27 01 32 00 3142-62 T co CCGG -999.990 -999.990 *.. R2 1989 09 06 09 26 00 -14.2500 -170.5700 44.00 42.00 2.00 122685 SMO 1989 08 27 01 32 00 3142-62 T co CCGG -999.990 -999.990 *.. R2 1989 09 06 09 36 00 -14.2500 -170.5700 44.00 42.00 2.00 122685 SMO 1989 08 27 01 35 00 2053-64 P co CCGG -999.990 -999.990 *.. R2 1989 09 06 07 14 00 -14.2500 -170.5700 45.00 42.00 3.00 122686 SMO 1989 08 27 01 35 00 2053-64 P co CCGG -999.990 -999.990 *.. R2 1989 09 06 07 25 00 -14.2500 -170.5700 45.00 42.00 3.00 122686 SMO 1989 08 27 01 35 00 2053-64 P co CCGG -999.990 -999.990 *.. R2 1989 09 06 07 38 00 -14.2500 -170.5700 45.00 42.00 3.00 122686 SMO 1989 09 01 02 33 00 3144-62 T co CCGG 56.320 -999.990 ... R2 1989 09 25 09 21 00 -14.2500 -170.5700 44.00 42.00 2.00 122694 SMO 1989 09 01 02 33 00 3144-62 T co CCGG 58.690 -999.990 ... R2 1989 09 25 09 32 00 -14.2500 -170.5700 44.00 42.00 2.00 122694 SMO 1989 09 01 02 42 00 2007-66 P co CCGG 60.820 -999.990 ... R2 1989 09 18 09 55 00 -14.2500 -170.5700 45.00 42.00 3.00 122697 SMO 1989 09 01 02 42 00 2007-66 P co CCGG 62.210 -999.990 ... R2 1989 09 18 10 07 00 -14.2500 -170.5700 45.00 42.00 3.00 122697 SMO 1989 09 10 04 04 00 3150-62 T co CCGG 62.510 -999.990 ... R2 1989 09 25 09 16 00 -14.2500 -170.5700 44.00 42.00 2.00 122701 SMO 1989 09 10 04 04 00 3150-62 T co CCGG 60.520 -999.990 ... R2 1989 09 25 09 27 00 -14.2500 -170.5700 44.00 42.00 2.00 122701 SMO 1989 09 10 04 04 00 3150-62 T co CCGG 65.110 -999.990 ... R2 1989 09 25 09 37 00 -14.2500 -170.5700 44.00 42.00 2.00 122701 SMO 1989 09 10 04 10 00 2271-62 P co CCGG 65.480 -999.990 ... R2 1989 09 25 08 28 00 -14.2500 -170.5700 45.00 42.00 3.00 122702 SMO 1989 09 10 04 10 00 2271-62 P co CCGG 64.690 -999.990 ... R2 1989 09 25 08 39 00 -14.2500 -170.5700 45.00 42.00 3.00 122702 SMO 1989 09 15 01 16 00 3134-62 T co CCGG 58.150 -999.990 ... R2 1989 09 26 08 52 00 -14.2500 -170.5700 44.00 42.00 2.00 122705 SMO 1989 09 15 01 16 00 3134-62 T co CCGG 61.690 -999.990 ... R2 1989 09 26 09 03 00 -14.2500 -170.5700 44.00 42.00 2.00 122705 SMO 1989 09 15 01 16 00 3134-62 T co CCGG 62.060 -999.990 ... R2 1989 09 26 09 08 00 -14.2500 -170.5700 44.00 42.00 2.00 122705 SMO 1989 09 15 01 19 00 2009-66 P co CCGG 59.660 -999.990 ... R2 1989 09 25 08 23 00 -14.2500 -170.5700 45.00 42.00 3.00 122706 SMO 1989 09 15 01 19 00 2009-66 P co CCGG 60.090 -999.990 ... R2 1989 09 25 08 33 00 -14.2500 -170.5700 45.00 42.00 3.00 122706 SMO 1989 09 22 02 28 00 2011-66 P co CCGG 59.240 -999.990 ... R2 1989 09 26 08 19 00 -14.2500 -170.5700 45.00 42.00 3.00 122712 SMO 1989 09 22 02 28 00 2011-66 P co CCGG 61.210 -999.990 ... R2 1989 09 26 08 29 00 -14.2500 -170.5700 45.00 42.00 3.00 122712 SMO 1989 09 22 02 28 00 2011-66 P co CCGG 59.510 -999.990 ... R2 1989 09 26 08 40 00 -14.2500 -170.5700 45.00 42.00 3.00 122712 SMO 1989 09 22 02 28 00 3146-62 T co CCGG 68.260 -999.990 ... R2 1989 09 26 08 35 00 -14.2500 -170.5700 44.00 42.00 2.00 122715 SMO 1989 09 22 02 28 00 3146-62 T co CCGG 66.410 -999.990 ... R2 1989 09 26 08 47 00 -14.2500 -170.5700 44.00 42.00 2.00 122715 SMO 1989 09 22 02 28 00 3146-62 T co CCGG 69.100 -999.990 ... R2 1989 09 26 08 58 00 -14.2500 -170.5700 44.00 42.00 2.00 122715 SMO 1989 09 28 23 10 00 2133-62 P co CCGG 72.240 -999.990 ... R2 1989 10 05 07 12 00 -14.2500 -170.5700 45.00 42.00 3.00 122718 SMO 1989 09 28 23 10 00 2133-62 P co CCGG 72.770 -999.990 ... R2 1989 10 05 07 24 00 -14.2500 -170.5700 45.00 42.00 3.00 122718 SMO 1989 09 28 23 10 00 3130-62 T co CCGG 70.740 -999.990 ... R2 1989 10 16 16 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122721 SMO 1989 09 28 23 10 00 3130-62 T co CCGG 69.240 -999.990 ... R2 1989 10 16 16 05 00 -14.2500 -170.5700 44.00 42.00 2.00 122721 SMO 1989 10 07 03 15 00 2053-64 P co CCGG 63.740 -999.990 ... R2 1989 10 16 10 40 00 -14.2500 -170.5700 45.00 42.00 3.00 122724 SMO 1989 10 07 03 15 00 2053-64 P co CCGG 64.960 -999.990 ... R2 1989 10 16 10 51 00 -14.2500 -170.5700 45.00 42.00 3.00 122724 SMO 1989 10 07 03 15 00 3138-62 T co CCGG 66.380 -999.990 ... R2 1989 10 16 15 33 00 -14.2500 -170.5700 44.00 42.00 2.00 122726 SMO 1989 10 07 03 15 00 3138-62 T co CCGG 63.100 -999.990 ... R2 1989 10 16 15 44 00 -14.2500 -170.5700 44.00 42.00 2.00 122726 SMO 1989 10 07 03 15 00 3138-62 T co CCGG 64.910 -999.990 ... R2 1989 10 16 15 55 00 -14.2500 -170.5700 44.00 42.00 2.00 122726 SMO 1989 10 13 03 03 00 2045-64 P co CCGG 77.510 -999.990 ... R2 1989 10 26 08 17 00 -14.2500 -170.5700 45.00 42.00 3.00 122729 SMO 1989 10 13 03 03 00 2045-64 P co CCGG 72.300 -999.990 Z.. R2 1989 10 26 08 28 00 -14.2500 -170.5700 45.00 42.00 3.00 122729 SMO 1989 10 13 03 03 00 2045-64 P co CCGG 79.290 -999.990 ... R2 1989 10 26 08 33 00 -14.2500 -170.5700 45.00 42.00 3.00 122729 SMO 1989 10 13 03 03 00 3128-62 T co CCGG 66.050 -999.990 ... R2 1989 10 26 08 39 00 -14.2500 -170.5700 44.00 42.00 2.00 122731 SMO 1989 10 13 03 03 00 3128-62 T co CCGG 70.500 -999.990 Z.. R2 1989 10 26 08 50 00 -14.2500 -170.5700 44.00 42.00 2.00 122731 SMO 1989 10 13 03 03 00 3128-62 T co CCGG 69.350 -999.990 ... R2 1989 10 26 09 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122731 SMO 1989 10 13 03 03 00 3128-62 T co CCGG 64.770 -999.990 Z.. R2 1989 10 26 09 05 00 -14.2500 -170.5700 44.00 42.00 2.00 122731 SMO 1989 10 19 23 50 00 2047-64 P co CCGG 57.080 -999.990 Z.. R2 1989 10 26 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122732 SMO 1989 10 19 23 50 00 2047-64 P co CCGG 62.140 -999.990 ... R2 1989 10 26 08 12 00 -14.2500 -170.5700 45.00 42.00 3.00 122732 SMO 1989 10 19 23 50 00 2047-64 P co CCGG 62.100 -999.990 ... R2 1989 10 26 08 22 00 -14.2500 -170.5700 45.00 42.00 3.00 122732 SMO 1989 10 19 23 50 00 3132-62 T co CCGG 67.660 -999.990 ... R2 1989 10 26 08 44 00 -14.2500 -170.5700 44.00 42.00 2.00 122735 SMO 1989 10 19 23 50 00 3132-62 T co CCGG 66.360 -999.990 ... R2 1989 10 26 08 55 00 -14.2500 -170.5700 44.00 42.00 2.00 122735 SMO 1989 10 27 22 19 00 2003-64 P co CCGG 74.860 -999.990 ... R2 1989 11 07 11 24 00 -14.2500 -170.5700 45.00 42.00 3.00 122740 SMO 1989 10 27 22 19 00 3136-62 T co CCGG 76.070 -999.990 ... R2 1989 11 15 10 24 00 -14.2500 -170.5700 44.00 42.00 2.00 122743 SMO 1989 10 27 22 19 00 3136-62 T co CCGG 75.440 -999.990 ... R2 1989 11 15 10 35 00 -14.2500 -170.5700 44.00 42.00 2.00 122743 SMO 1989 11 02 22 55 00 2277-62 P co CCGG 72.210 -999.990 ... R2 1989 11 15 09 34 00 -14.2500 -170.5700 45.00 42.00 3.00 122746 SMO 1989 11 02 22 55 00 2277-62 P co CCGG 72.310 -999.990 ... R2 1989 11 15 09 45 00 -14.2500 -170.5700 45.00 42.00 3.00 122746 SMO 1989 11 02 22 55 00 3148-62 T co CCGG 69.170 -999.990 ... R2 1989 11 15 10 29 00 -14.2500 -170.5700 44.00 42.00 2.00 122749 SMO 1989 11 02 22 55 00 3148-62 T co CCGG 69.750 -999.990 ... R2 1989 11 15 10 40 00 -14.2500 -170.5700 44.00 42.00 2.00 122749 SMO 1989 11 10 03 17 00 2021-64 P co CCGG 65.340 -999.990 R.. R2 1989 11 24 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122752 SMO 1989 11 10 03 17 00 2021-64 P co CCGG 65.840 -999.990 R.. R2 1989 11 24 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122752 SMO 1989 11 17 01 42 00 2313-62 P co CCGG 60.310 -999.990 R.. R2 1989 12 04 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122757 SMO 1989 11 17 01 42 00 2313-62 P co CCGG 60.900 -999.990 R.. R2 1989 12 04 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122757 SMO 1989 11 17 01 42 00 3142-62 T co CCGG 63.100 -999.990 R.. R2 1989 12 04 08 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122760 SMO 1989 11 17 01 42 00 3142-62 T co CCGG 63.390 -999.990 R.. R2 1989 12 04 08 01 00 -14.2500 -170.5700 44.00 42.00 2.00 122760 SMO 1989 11 28 00 10 00 2053-64 P co CCGG 64.410 -999.990 ... R2 1989 12 11 09 33 00 -14.2500 -170.5700 45.00 42.00 3.00 122761 SMO 1989 11 28 00 10 00 2053-64 P co CCGG 65.190 -999.990 ... R2 1989 12 11 09 43 00 -14.2500 -170.5700 45.00 42.00 3.00 122761 SMO 1989 11 28 00 10 00 3134-62 T co CCGG 66.900 -999.990 ... R2 1989 12 11 11 08 00 -14.2500 -170.5700 44.00 42.00 2.00 122764 SMO 1989 11 28 00 10 00 3134-62 T co CCGG 66.500 -999.990 ... R2 1989 12 11 11 18 00 -14.2500 -170.5700 44.00 42.00 2.00 122764 SMO 1989 11 28 00 10 00 3134-62 T co CCGG 66.770 -999.990 ... R2 1989 12 11 11 28 00 -14.2500 -170.5700 44.00 42.00 2.00 122764 SMO 1989 11 28 00 10 00 3134-62 T co CCGG 66.190 -999.990 ... R2 1989 12 11 11 34 00 -14.2500 -170.5700 44.00 42.00 2.00 122764 SMO 1989 12 01 23 27 00 2049-64 P co CCGG 69.040 -999.990 ... R2 1989 12 11 09 49 00 -14.2500 -170.5700 45.00 42.00 3.00 122769 SMO 1989 12 01 23 27 00 2049-64 P co CCGG 69.550 -999.990 ... R2 1989 12 11 10 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122769 SMO 1989 12 01 23 27 00 3150-62 T co CCGG 67.790 -999.990 ... R2 1989 12 11 11 03 00 -14.2500 -170.5700 44.00 42.00 2.00 122772 SMO 1989 12 01 23 27 00 3150-62 T co CCGG 67.710 -999.990 ... R2 1989 12 11 11 13 00 -14.2500 -170.5700 44.00 42.00 2.00 122772 SMO 1989 12 10 05 15 00 2110-62 P co CCGG 70.090 -999.990 P.. R2 1989 12 22 09 47 00 -14.2500 -170.5700 45.00 42.00 3.00 122775 SMO 1989 12 10 05 15 00 3015-66 T co CCGG 62.030 -999.990 ... R2 1990 01 03 16 05 00 -14.2500 -170.5700 44.00 42.00 2.00 122776 SMO 1989 12 10 05 15 00 3015-66 T co CCGG 61.710 -999.990 P.. R2 1990 01 03 16 15 00 -14.2500 -170.5700 44.00 42.00 2.00 122776 SMO 1989 12 10 05 15 00 3016-66 T co CCGG 62.580 -999.990 ... R2 1990 01 10 07 46 00 -14.2500 -170.5700 44.00 42.00 2.00 122777 SMO 1989 12 10 05 15 00 3016-66 T co CCGG 62.610 -999.990 ... R2 1990 01 10 07 57 00 -14.2500 -170.5700 44.00 42.00 2.00 122777 SMO 1989 12 15 01 27 00 2015-62 P co CCGG 73.310 -999.990 ... R2 1990 01 03 10 42 00 -14.2500 -170.5700 45.00 42.00 3.00 122780 SMO 1989 12 15 01 27 00 2015-62 P co CCGG 72.410 -999.990 ... R2 1990 01 03 10 54 00 -14.2500 -170.5700 45.00 42.00 3.00 122780 SMO 1989 12 15 01 27 00 3018-66 T co CCGG 79.450 -999.990 .X. R2 1990 01 10 07 52 00 -14.2500 -170.5700 44.00 42.00 2.00 122783 SMO 1989 12 15 01 27 00 3018-66 T co CCGG 77.330 -999.990 .X. R2 1990 01 10 08 03 00 -14.2500 -170.5700 44.00 42.00 2.00 122783 SMO 1989 12 22 03 28 00 2047-64 P co CCGG 56.360 -999.990 ... R2 1990 01 03 10 37 00 -14.2500 -170.5700 45.00 42.00 3.00 122786 SMO 1989 12 22 03 28 00 2047-64 P co CCGG 57.540 -999.990 ... R2 1990 01 03 10 48 00 -14.2500 -170.5700 45.00 42.00 3.00 122786 SMO 1989 12 22 03 28 00 3047-66 T co CCGG 57.210 -999.990 ... R2 1990 01 10 08 55 00 -14.2500 -170.5700 44.00 42.00 2.00 122788 SMO 1989 12 22 03 28 00 3047-66 T co CCGG 56.260 -999.990 ... R2 1990 01 10 09 06 00 -14.2500 -170.5700 44.00 42.00 2.00 122788 SMO 1989 12 22 03 28 00 3048-66 T co CCGG 57.410 -999.990 ... R2 1990 01 10 08 34 00 -14.2500 -170.5700 44.00 42.00 2.00 122789 SMO 1989 12 22 03 28 00 3048-66 T co CCGG 55.940 -999.990 ... R2 1990 01 10 08 45 00 -14.2500 -170.5700 44.00 42.00 2.00 122789 SMO 1989 12 28 23 38 00 2313-62 P co CCGG 55.280 -999.990 ... R2 1990 01 10 09 59 00 -14.2500 -170.5700 45.00 42.00 3.00 122792 SMO 1989 12 28 23 38 00 2313-62 P co CCGG 55.770 -999.990 ... R2 1990 01 10 10 10 00 -14.2500 -170.5700 45.00 42.00 3.00 122792 SMO 1989 12 28 23 38 00 3049-66 T co CCGG 54.880 -999.990 ... R2 1990 01 10 08 40 00 -14.2500 -170.5700 44.00 42.00 2.00 122794 SMO 1989 12 28 23 38 00 3049-66 T co CCGG 54.250 -999.990 ... R2 1990 01 10 08 50 00 -14.2500 -170.5700 44.00 42.00 2.00 122794 SMO 1989 12 28 23 38 00 3050-66 T co CCGG 55.380 -999.990 ... R2 1990 01 10 08 14 00 -14.2500 -170.5700 44.00 42.00 2.00 122795 SMO 1989 12 28 23 38 00 3050-66 T co CCGG 55.070 -999.990 ... R2 1990 01 10 08 24 00 -14.2500 -170.5700 44.00 42.00 2.00 122795 SMO 1990 01 04 22 26 00 2007-66 P co CCGG 54.970 -999.990 ... R2 1990 01 17 08 52 00 -14.2500 -170.5700 45.00 42.00 3.00 122798 SMO 1990 01 04 22 26 00 2007-66 P co CCGG 56.110 -999.990 ... R2 1990 01 17 09 03 00 -14.2500 -170.5700 45.00 42.00 3.00 122798 SMO 1990 01 04 22 26 00 3087-66 T co CCGG 62.080 -999.990 ... R2 1990 01 23 08 36 00 -14.2500 -170.5700 44.00 42.00 2.00 122800 SMO 1990 01 04 22 26 00 3087-66 T co CCGG 61.890 -999.990 ... R2 1990 01 23 08 47 00 -14.2500 -170.5700 44.00 42.00 2.00 122800 SMO 1990 01 04 22 26 00 3087-66 T co CCGG 62.270 -999.990 ... R2 1990 01 23 08 58 00 -14.2500 -170.5700 44.00 42.00 2.00 122800 SMO 1990 01 04 22 26 00 3088-66 T co CCGG 60.190 -999.990 ... R2 1990 01 30 10 21 00 -14.2500 -170.5700 44.00 42.00 2.00 122801 SMO 1990 01 04 22 26 00 3088-66 T co CCGG 59.710 -999.990 ... R2 1990 01 30 10 32 00 -14.2500 -170.5700 44.00 42.00 2.00 122801 SMO 1990 01 11 23 41 00 2119-62 P co CCGG 63.270 -999.990 ... R2 1990 01 23 07 57 00 -14.2500 -170.5700 45.00 42.00 3.00 122804 SMO 1990 01 11 23 41 00 2119-62 P co CCGG 63.070 -999.990 ... R2 1990 01 23 08 08 00 -14.2500 -170.5700 45.00 42.00 3.00 122804 SMO 1990 01 11 23 41 00 3089-66 T co CCGG 68.780 -999.990 ... R2 1990 01 23 08 31 00 -14.2500 -170.5700 44.00 42.00 2.00 122806 SMO 1990 01 11 23 41 00 3089-66 T co CCGG 69.060 -999.990 ... R2 1990 01 23 08 41 00 -14.2500 -170.5700 44.00 42.00 2.00 122806 SMO 1990 01 11 23 41 00 3089-66 T co CCGG 67.450 -999.990 ... R2 1990 01 23 08 53 00 -14.2500 -170.5700 44.00 42.00 2.00 122806 SMO 1990 01 11 23 41 00 3090-66 T co CCGG 63.710 -999.990 ... R2 1990 01 30 10 38 00 -14.2500 -170.5700 44.00 42.00 2.00 122807 SMO 1990 01 11 23 41 00 3090-66 T co CCGG 66.280 -999.990 ... R2 1990 01 30 10 48 00 -14.2500 -170.5700 44.00 42.00 2.00 122807 SMO 1990 01 19 01 24 00 2005-66 P co CCGG 54.270 -999.990 ... R2 1990 01 30 08 27 00 -14.2500 -170.5700 45.00 42.00 3.00 122810 SMO 1990 01 19 01 24 00 2005-66 P co CCGG 55.100 -999.990 ... R2 1990 01 30 08 37 00 -14.2500 -170.5700 45.00 42.00 3.00 122810 SMO 1990 01 19 01 24 00 3107-66 T co CCGG 52.510 -999.990 ... R2 1990 02 02 08 38 00 -14.2500 -170.5700 44.00 42.00 2.00 122812 SMO 1990 01 19 01 24 00 3107-66 T co CCGG 50.940 -999.990 ... R2 1990 02 02 08 48 00 -14.2500 -170.5700 44.00 42.00 2.00 122812 SMO 1990 01 19 01 24 00 3107-66 T co CCGG 51.100 -999.990 ... R2 1990 02 02 08 59 00 -14.2500 -170.5700 44.00 42.00 2.00 122812 SMO 1990 01 19 01 24 00 3108-66 T co CCGG 53.690 -999.990 ... R2 1990 02 02 10 49 00 -14.2500 -170.5700 44.00 42.00 2.00 122813 SMO 1990 01 19 01 24 00 3108-66 T co CCGG 54.500 -999.990 ... R2 1990 02 02 11 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122813 SMO 1990 01 19 01 24 00 3108-66 T co CCGG 54.310 -999.990 ... R2 1990 02 02 11 11 00 -14.2500 -170.5700 44.00 42.00 2.00 122813 SMO 1990 01 27 02 17 00 2035-62 P co CCGG 57.670 -999.990 R.. R2 1990 02 13 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122816 SMO 1990 01 27 02 17 00 2035-62 P co CCGG 59.020 -999.990 R.. R2 1990 02 13 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122816 SMO 1990 01 27 02 17 00 3109-66 T co CCGG 54.040 -999.990 ... R2 1990 02 02 08 53 00 -14.2500 -170.5700 44.00 42.00 2.00 122818 SMO 1990 01 27 02 17 00 3109-66 T co CCGG 55.050 -999.990 ... R2 1990 02 02 09 05 00 -14.2500 -170.5700 44.00 42.00 2.00 122818 SMO 1990 01 27 02 17 00 3110-66 T co CCGG 53.050 -999.990 ... R2 1990 02 02 11 05 00 -14.2500 -170.5700 44.00 42.00 2.00 122819 SMO 1990 01 27 02 17 00 3110-66 T co CCGG 52.350 -999.990 ... R2 1990 02 02 11 16 00 -14.2500 -170.5700 44.00 42.00 2.00 122819 SMO 1990 02 02 01 14 00 2029-66 P co CCGG 72.230 -999.990 .X. R2 1990 02 16 09 53 00 -14.2500 -170.5700 45.00 42.00 3.00 122822 SMO 1990 02 02 01 14 00 2029-66 P co CCGG 73.400 -999.990 .X. R2 1990 02 16 10 05 00 -14.2500 -170.5700 45.00 42.00 3.00 122822 SMO 1990 02 02 01 14 00 3141-66 T co CCGG 70.610 -999.990 ... R2 1990 03 02 09 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122824 SMO 1990 02 02 01 14 00 3141-66 T co CCGG 71.300 -999.990 ... R2 1990 03 02 09 12 00 -14.2500 -170.5700 44.00 42.00 2.00 122824 SMO 1990 02 02 01 14 00 3142-66 T co CCGG 70.850 -999.990 ... R2 1990 03 02 08 07 00 -14.2500 -170.5700 44.00 42.00 2.00 122825 SMO 1990 02 02 01 14 00 3142-66 T co CCGG 71.290 -999.990 ... R2 1990 03 02 08 21 00 -14.2500 -170.5700 44.00 42.00 2.00 122825 SMO 1990 02 18 00 05 00 2005-62 P co CCGG 55.860 -999.990 ... R2 1990 02 27 10 34 00 -14.2500 -170.5700 45.00 42.00 3.00 122826 SMO 1990 02 18 00 05 00 2005-62 P co CCGG 56.120 -999.990 ... R2 1990 02 27 10 46 00 -14.2500 -170.5700 45.00 42.00 3.00 122826 SMO 1990 02 18 00 05 00 3059-66 T co CCGG 55.150 -999.990 ... R2 1990 03 02 08 14 00 -14.2500 -170.5700 44.00 42.00 2.00 122828 SMO 1990 02 18 00 05 00 3059-66 T co CCGG 55.270 -999.990 ... R2 1990 03 02 08 29 00 -14.2500 -170.5700 44.00 42.00 2.00 122828 SMO 1990 02 18 00 05 00 3060-66 T co CCGG 55.530 -999.990 ... R2 1990 03 02 07 49 00 -14.2500 -170.5700 44.00 42.00 2.00 122829 SMO 1990 02 18 00 05 00 3060-66 T co CCGG 55.360 -999.990 ... R2 1990 03 02 08 01 00 -14.2500 -170.5700 44.00 42.00 2.00 122829 SMO 1990 02 23 22 16 00 2311-62 P co CCGG 50.280 -999.990 ... R2 1990 02 27 10 04 00 -14.2500 -170.5700 45.00 42.00 3.00 122830 SMO 1990 02 23 22 16 00 2311-62 P co CCGG 50.730 -999.990 ... R2 1990 02 27 10 15 00 -14.2500 -170.5700 45.00 42.00 3.00 122830 SMO 1990 02 23 22 16 00 2311-62 P co CCGG 52.020 -999.990 ... R2 1990 02 27 10 27 00 -14.2500 -170.5700 45.00 42.00 3.00 122830 SMO 1990 02 23 22 16 00 3035-66 T co CCGG 57.560 -999.990 P.. R2 1990 03 16 10 49 00 -14.2500 -170.5700 44.00 42.00 2.00 122832 SMO 1990 02 23 22 16 00 3035-66 T co CCGG 55.480 -999.990 P.. R2 1990 03 16 11 01 00 -14.2500 -170.5700 44.00 42.00 2.00 122832 SMO 1990 02 23 22 16 00 3035-66 T co CCGG 58.470 -999.990 P.. R2 1990 03 16 11 14 00 -14.2500 -170.5700 44.00 42.00 2.00 122832 SMO 1990 02 23 22 16 00 3036-66 T co CCGG 68.360 -999.990 P.. R2 1990 03 16 11 32 00 -14.2500 -170.5700 44.00 42.00 2.00 122833 SMO 1990 02 23 22 16 00 3036-66 T co CCGG 69.900 -999.990 P.. R2 1990 03 16 11 44 00 -14.2500 -170.5700 44.00 42.00 2.00 122833 SMO 1990 03 02 02 05 00 2269-62 P co CCGG 64.980 -999.990 ... R2 1990 03 16 09 45 00 -14.2500 -170.5700 45.00 42.00 3.00 122834 SMO 1990 03 02 02 05 00 2269-62 P co CCGG 65.130 -999.990 ... R2 1990 03 16 09 58 00 -14.2500 -170.5700 45.00 42.00 3.00 122834 SMO 1990 03 02 02 05 00 3041-66 T co CCGG 60.010 -999.990 ... R2 1990 03 16 10 35 00 -14.2500 -170.5700 44.00 42.00 2.00 122836 SMO 1990 03 02 02 05 00 3041-66 T co CCGG 59.200 -999.990 ... R2 1990 03 16 10 43 00 -14.2500 -170.5700 44.00 42.00 2.00 122836 SMO 1990 03 02 02 05 00 3041-66 T co CCGG 59.000 -999.990 ... R2 1990 03 16 10 55 00 -14.2500 -170.5700 44.00 42.00 2.00 122836 SMO 1990 03 02 02 05 00 3041-66 T co CCGG 60.540 -999.990 ... R2 1990 03 16 11 08 00 -14.2500 -170.5700 44.00 42.00 2.00 122836 SMO 1990 03 02 02 05 00 3042-66 T co CCGG 58.790 -999.990 ... R2 1990 03 20 08 22 00 -14.2500 -170.5700 44.00 42.00 2.00 122837 SMO 1990 03 02 02 05 00 3042-66 T co CCGG 59.210 -999.990 ... R2 1990 03 20 08 34 00 -14.2500 -170.5700 44.00 42.00 2.00 122837 SMO 1990 03 13 01 06 00 2327-62 P co CCGG 67.020 -999.990 ... R2 1990 03 20 07 25 00 -14.2500 -170.5700 45.00 42.00 3.00 122838 SMO 1990 03 13 01 07 00 3019-66 T co CCGG 66.380 -999.990 ... R2 1990 03 23 10 14 00 -14.2500 -170.5700 44.00 42.00 2.00 122840 SMO 1990 03 13 01 07 00 3019-66 T co CCGG 63.270 -999.990 ... R2 1990 03 23 10 25 00 -14.2500 -170.5700 44.00 42.00 2.00 122840 SMO 1990 03 13 01 07 00 3019-66 T co CCGG 63.300 -999.990 ... R2 1990 03 23 10 36 00 -14.2500 -170.5700 44.00 42.00 2.00 122840 SMO 1990 03 13 01 07 00 3020-66 T co CCGG 63.850 -999.990 R.. R2 1990 03 27 08 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122841 SMO 1990 03 17 00 39 00 2125-62 P co CCGG 62.470 -999.990 ... R2 1990 03 23 08 11 00 -14.2500 -170.5700 45.00 42.00 3.00 122842 SMO 1990 03 17 00 44 00 3143-66 T co CCGG 58.800 -999.990 ... R2 1990 03 23 10 31 00 -14.2500 -170.5700 44.00 42.00 2.00 122844 SMO 1990 03 17 00 44 00 3143-66 T co CCGG 59.100 -999.990 ... R2 1990 03 23 10 42 00 -14.2500 -170.5700 44.00 42.00 2.00 122844 SMO 1990 03 17 00 44 00 3144-66 T co CCGG 61.760 -999.990 R.. R2 1990 03 27 08 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122845 SMO 1990 03 22 22 49 00 3003-66 T co CCGG 82.630 -999.990 .X. R2 1990 04 04 10 04 00 -14.2500 -170.5700 44.00 42.00 2.00 122846 SMO 1990 03 22 22 49 00 3003-66 T co CCGG 82.160 -999.990 .X. R2 1990 04 04 10 15 00 -14.2500 -170.5700 44.00 42.00 2.00 122846 SMO 1990 03 22 22 49 00 3004-66 T co CCGG 82.440 -999.990 R.. R2 1990 04 11 08 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122847 SMO 1990 03 22 22 49 00 3004-66 T co CCGG 83.510 -999.990 R.. R2 1990 04 11 08 01 00 -14.2500 -170.5700 44.00 42.00 2.00 122847 SMO 1990 03 22 22 51 00 2063-66 P co CCGG 86.910 -999.990 .X. R2 1990 04 04 09 46 00 -14.2500 -170.5700 45.00 42.00 3.00 122849 SMO 1990 03 29 23 32 00 2061-66 P co CCGG 57.370 -999.990 ... R2 1990 04 04 07 43 00 -14.2500 -170.5700 45.00 42.00 3.00 122850 SMO 1990 03 29 23 36 00 3037-66 T co CCGG 59.490 -999.990 ... R2 1990 04 04 09 58 00 -14.2500 -170.5700 44.00 42.00 2.00 122852 SMO 1990 03 29 23 36 00 3038-66 T co CCGG 58.910 -999.990 R.. R2 1990 04 11 08 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122853 SMO 1990 04 05 23 30 00 2077-66 P co CCGG 75.350 -999.990 .X. R2 1990 04 27 10 14 00 -14.2500 -170.5700 45.00 42.00 3.00 122854 SMO 1990 04 05 23 32 00 3025-66 T co CCGG 78.840 -999.990 .X. R2 1990 05 01 10 14 00 -14.2500 -170.5700 44.00 42.00 2.00 122856 SMO 1990 04 05 23 32 00 3025-66 T co CCGG 77.040 -999.990 .X. R2 1990 05 01 10 26 00 -14.2500 -170.5700 44.00 42.00 2.00 122856 SMO 1990 04 05 23 32 00 3025-66 T co CCGG 77.810 -999.990 .X. R2 1990 05 01 10 37 00 -14.2500 -170.5700 44.00 42.00 2.00 122856 SMO 1990 04 05 23 32 00 3026-66 T co CCGG 81.670 -999.990 .X. R2 1990 05 01 10 08 00 -14.2500 -170.5700 44.00 42.00 2.00 122857 SMO 1990 04 13 02 30 00 2075-66 P co CCGG 61.600 -999.990 ... R2 1990 04 27 10 25 00 -14.2500 -170.5700 45.00 42.00 3.00 122858 SMO 1990 04 13 02 30 00 2075-66 P co CCGG 62.710 -999.990 ... R2 1990 04 27 10 37 00 -14.2500 -170.5700 45.00 42.00 3.00 122858 SMO 1990 04 13 02 30 00 3043-66 T co CCGG 58.800 -999.990 P.. R2 1990 05 01 10 20 00 -14.2500 -170.5700 44.00 42.00 2.00 122860 SMO 1990 04 13 02 30 00 3043-66 T co CCGG 60.370 -999.990 P.. R2 1990 05 01 10 32 00 -14.2500 -170.5700 44.00 42.00 2.00 122860 SMO 1990 04 13 02 30 00 3043-66 T co CCGG 59.530 -999.990 P.. R2 1990 05 01 10 43 00 -14.2500 -170.5700 44.00 42.00 2.00 122860 SMO 1990 04 13 02 30 00 3044-66 T co CCGG 66.060 -999.990 P.. R2 1990 05 01 10 02 00 -14.2500 -170.5700 44.00 42.00 2.00 122861 SMO 1990 04 18 00 10 00 3116-66 T co CCGG 62.600 -999.990 ... R2 1990 05 01 07 46 00 -14.2500 -170.5700 44.00 42.00 2.00 122862 SMO 1990 04 18 00 10 00 3116-66 T co CCGG 62.050 -999.990 ... R2 1990 05 01 08 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122862 SMO 1990 04 19 22 45 00 2139-66 P co CCGG 72.680 -999.990 ... R2 1990 05 01 11 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122863 SMO 1990 04 19 22 45 00 2139-66 P co CCGG 72.020 -999.990 ... R2 1990 05 01 11 12 00 -14.2500 -170.5700 45.00 42.00 3.00 122863 SMO 1990 04 19 22 45 00 3031-66 T co CCGG 70.210 -999.990 ... R2 1990 05 01 08 06 00 -14.2500 -170.5700 44.00 42.00 2.00 122865 SMO 1990 04 19 22 45 00 3031-66 T co CCGG 71.490 -999.990 ... R2 1990 05 01 08 19 00 -14.2500 -170.5700 44.00 42.00 2.00 122865 SMO 1990 04 19 22 45 00 3031-66 T co CCGG 70.750 -999.990 ... R2 1990 05 01 08 31 00 -14.2500 -170.5700 44.00 42.00 2.00 122865 SMO 1990 04 19 22 45 00 3032-66 T co CCGG 71.600 -999.990 ... R2 1990 05 01 07 40 00 -14.2500 -170.5700 44.00 42.00 2.00 122866 SMO 1990 04 19 22 45 00 3032-66 T co CCGG 71.630 -999.990 ... R2 1990 05 01 07 54 00 -14.2500 -170.5700 44.00 42.00 2.00 122866 SMO 1990 04 24 22 50 00 3087-66 T co CCGG 75.190 -999.990 P.. R2 1990 05 09 08 58 00 -14.2500 -170.5700 44.00 42.00 2.00 122867 SMO 1990 04 24 22 50 00 3087-66 T co CCGG 76.940 -999.990 P.. R2 1990 05 09 09 09 00 -14.2500 -170.5700 44.00 42.00 2.00 122867 SMO 1990 04 24 22 50 00 3087-66 T co CCGG 75.450 -999.990 P.. R2 1990 05 09 09 21 00 -14.2500 -170.5700 44.00 42.00 2.00 122867 SMO 1990 04 24 22 50 00 3088-66 T co CCGG 69.630 -999.990 P.. R2 1990 05 09 08 32 00 -14.2500 -170.5700 44.00 42.00 2.00 122868 SMO 1990 04 24 22 50 00 3088-66 T co CCGG 70.240 -999.990 P.. R2 1990 05 09 08 45 00 -14.2500 -170.5700 44.00 42.00 2.00 122868 SMO 1990 04 27 00 45 00 2141-66 P co CCGG 59.260 -999.990 ... R2 1990 05 01 11 06 00 -14.2500 -170.5700 45.00 42.00 3.00 122869 SMO 1990 04 27 00 45 00 2141-66 P co CCGG 62.190 -999.990 ... R2 1990 05 01 11 18 00 -14.2500 -170.5700 45.00 42.00 3.00 122869 SMO 1990 04 27 00 45 00 2141-66 P co CCGG 61.970 -999.990 ... R2 1990 05 01 11 23 00 -14.2500 -170.5700 45.00 42.00 3.00 122869 SMO 1990 04 27 00 45 00 3123-66 T co CCGG 59.360 -999.990 ... R2 1990 05 09 09 03 00 -14.2500 -170.5700 44.00 42.00 2.00 122871 SMO 1990 04 27 00 45 00 3123-66 T co CCGG 59.590 -999.990 ... R2 1990 05 09 09 15 00 -14.2500 -170.5700 44.00 42.00 2.00 122871 SMO 1990 04 27 00 45 00 3124-66 T co CCGG 59.000 -999.990 ... R2 1990 05 09 08 38 00 -14.2500 -170.5700 44.00 42.00 2.00 122872 SMO 1990 04 27 00 45 00 3124-66 T co CCGG 58.810 -999.990 ... R2 1990 05 09 08 51 00 -14.2500 -170.5700 44.00 42.00 2.00 122872 SMO 1990 05 01 23 30 00 3021-66 T co CCGG 69.590 -999.990 P.. R2 1990 05 11 08 48 00 -14.2500 -170.5700 44.00 42.00 2.00 122873 SMO 1990 05 01 23 30 00 3021-66 T co CCGG 69.170 -999.990 P.. R2 1990 05 11 09 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122873 SMO 1990 05 01 23 30 00 3021-66 T co CCGG 72.080 -999.990 P.. R2 1990 05 11 09 11 00 -14.2500 -170.5700 44.00 42.00 2.00 122873 SMO 1990 05 01 23 30 00 3022-66 T co CCGG 66.400 -999.990 P.. R2 1990 05 11 07 24 00 -14.2500 -170.5700 44.00 42.00 2.00 122874 SMO 1990 05 01 23 30 00 3022-66 T co CCGG 64.750 -999.990 P.. R2 1990 05 11 07 37 00 -14.2500 -170.5700 44.00 42.00 2.00 122874 SMO 1990 05 01 23 30 00 3022-66 T co CCGG 63.620 -999.990 P.. R2 1990 05 11 07 48 00 -14.2500 -170.5700 44.00 42.00 2.00 122874 SMO 1990 05 04 03 37 00 2005-66 P co CCGG 59.640 -999.990 ... R2 1990 05 11 09 55 00 -14.2500 -170.5700 45.00 42.00 3.00 122875 SMO 1990 05 04 03 37 00 2005-66 P co CCGG 60.710 -999.990 ... R2 1990 05 11 10 08 00 -14.2500 -170.5700 45.00 42.00 3.00 122875 SMO 1990 05 04 03 37 00 3033-66 T co CCGG 62.620 -999.990 ... R2 1990 05 11 08 54 00 -14.2500 -170.5700 44.00 42.00 2.00 122877 SMO 1990 05 04 03 37 00 3033-66 T co CCGG 60.890 -999.990 ... R2 1990 05 11 09 06 00 -14.2500 -170.5700 44.00 42.00 2.00 122877 SMO 1990 05 04 03 37 00 3033-66 T co CCGG 61.360 -999.990 ... R2 1990 05 11 09 17 00 -14.2500 -170.5700 44.00 42.00 2.00 122877 SMO 1990 05 04 03 37 00 3034-66 T co CCGG 62.490 -999.990 ... R2 1990 05 11 07 31 00 -14.2500 -170.5700 44.00 42.00 2.00 122878 SMO 1990 05 04 03 37 00 3034-66 T co CCGG 60.170 -999.990 ... R2 1990 05 11 07 43 00 -14.2500 -170.5700 44.00 42.00 2.00 122878 SMO 1990 05 04 03 37 00 3034-66 T co CCGG 60.500 -999.990 ... R2 1990 05 11 07 54 00 -14.2500 -170.5700 44.00 42.00 2.00 122878 SMO 1990 05 04 21 30 00 2131-66 S co CCGG 58.310 -999.990 S.. R2 1990 05 11 10 15 00 -14.2500 -170.5700 60.30 42.00 18.30 122879 SMO 1990 05 04 21 30 00 2131-66 S co CCGG 58.500 -999.990 S.. R2 1990 05 11 10 21 00 -14.2500 -170.5700 60.30 42.00 18.30 122879 SMO 1990 05 07 23 40 00 3125-66 T co CCGG 65.490 -999.990 ... R2 1990 06 08 08 07 00 -14.2500 -170.5700 44.00 42.00 2.00 122881 SMO 1990 05 07 23 40 00 3125-66 T co CCGG 63.750 -999.990 ... R2 1990 06 08 08 20 00 -14.2500 -170.5700 44.00 42.00 2.00 122881 SMO 1990 05 07 23 40 00 3126-66 T co CCGG 66.330 -999.990 ... R2 1990 05 25 07 23 00 -14.2500 -170.5700 44.00 42.00 2.00 122882 SMO 1990 05 07 23 40 00 3126-66 T co CCGG 65.060 -999.990 ... R2 1990 05 25 07 36 00 -14.2500 -170.5700 44.00 42.00 2.00 122882 SMO 1990 05 11 23 10 00 2323-62 S co CCGG 54.990 -999.990 S.. R2 1990 05 27 10 15 00 -14.2500 -170.5700 60.30 42.00 18.30 122883 SMO 1990 05 11 23 10 00 2323-62 S co CCGG 56.450 -999.990 S.. R2 1990 05 27 10 27 00 -14.2500 -170.5700 60.30 42.00 18.30 122883 SMO 1990 05 11 23 45 00 2011-66 P co CCGG 54.170 -999.990 Z.. R2 1990 05 27 10 21 00 -14.2500 -170.5700 45.00 42.00 3.00 122885 SMO 1990 05 11 23 45 00 2011-66 P co CCGG 58.850 -999.990 Z.. R2 1990 05 27 10 34 00 -14.2500 -170.5700 45.00 42.00 3.00 122885 SMO 1990 05 11 23 45 00 3055-66 T co CCGG 60.140 -999.990 ... R2 1990 05 25 08 19 00 -14.2500 -170.5700 44.00 42.00 2.00 122887 SMO 1990 05 11 23 45 00 3055-66 T co CCGG 58.650 -999.990 ... R2 1990 05 25 08 30 00 -14.2500 -170.5700 44.00 42.00 2.00 122887 SMO 1990 05 17 21 49 00 2129-66 S co CCGG 55.460 -999.990 S.. R2 1990 06 08 05 35 00 -14.2500 -170.5700 60.30 42.00 18.30 122888 SMO 1990 05 17 21 49 00 2129-66 S co CCGG 53.630 -999.990 S.. R2 1990 06 08 05 48 00 -14.2500 -170.5700 60.30 42.00 18.30 122888 SMO 1990 05 17 21 49 00 2129-66 S co CCGG 56.960 -999.990 S.. R2 1990 06 08 06 00 00 -14.2500 -170.5700 60.30 42.00 18.30 122888 SMO 1990 05 17 22 17 00 2051-66 P co CCGG 61.440 -999.990 ... R2 1990 06 08 04 43 00 -14.2500 -170.5700 45.00 42.00 3.00 122890 SMO 1990 05 17 22 17 00 2051-66 P co CCGG 62.780 -999.990 ... R2 1990 06 08 04 56 00 -14.2500 -170.5700 45.00 42.00 3.00 122890 SMO 1990 05 17 22 17 00 3061-66 T co CCGG 64.240 -999.990 ... R2 1990 06 12 11 07 00 -14.2500 -170.5700 44.00 42.00 2.00 122892 SMO 1990 05 17 22 17 00 3061-66 T co CCGG 65.260 -999.990 ... R2 1990 06 12 11 20 00 -14.2500 -170.5700 44.00 42.00 2.00 122892 SMO 1990 05 17 22 17 00 3062-66 T co CCGG 68.050 -999.990 ... R2 1990 06 26 10 24 00 -14.2500 -170.5700 44.00 42.00 2.00 122893 SMO 1990 05 25 21 37 00 2001-66 S co CCGG 59.510 -999.990 S.. R2 1990 06 07 06 33 00 -14.2500 -170.5700 60.30 42.00 18.30 122894 SMO 1990 05 25 21 37 00 2001-66 S co CCGG 58.010 -999.990 S.. R2 1990 06 07 06 48 00 -14.2500 -170.5700 60.30 42.00 18.30 122894 SMO 1990 05 25 23 25 00 2007-66 P co CCGG 56.340 -999.990 ... R2 1990 06 07 06 13 00 -14.2500 -170.5700 45.00 42.00 3.00 122896 SMO 1990 05 25 23 25 00 2007-66 P co CCGG 60.130 -999.990 ... R2 1990 06 07 06 26 00 -14.2500 -170.5700 45.00 42.00 3.00 122896 SMO 1990 05 25 23 25 00 2007-66 P co CCGG 58.790 -999.990 ... R2 1990 06 07 06 40 00 -14.2500 -170.5700 45.00 42.00 3.00 122896 SMO 1990 05 25 23 25 00 3139-66 T co CCGG 66.760 -999.990 ... R2 1990 06 12 11 26 00 -14.2500 -170.5700 44.00 42.00 2.00 122898 SMO 1990 05 25 23 25 00 3139-66 T co CCGG 67.030 -999.990 ... R2 1990 06 12 12 11 00 -14.2500 -170.5700 44.00 42.00 2.00 122898 SMO 1990 05 25 23 25 00 3139-66 T co CCGG 0.000 -999.990 Z.C R2 1990 06 12 12 24 00 -14.2500 -170.5700 44.00 42.00 2.00 122898 SMO 1990 05 25 23 25 00 3140-66 T co CCGG 61.890 -999.990 ... R2 1990 06 26 10 03 00 -14.2500 -170.5700 44.00 42.00 2.00 122899 SMO 1990 05 25 23 25 00 3140-66 T co CCGG 64.080 -999.990 ... R2 1990 06 26 10 17 00 -14.2500 -170.5700 44.00 42.00 2.00 122899 SMO 1990 05 25 23 25 00 3140-66 T co CCGG 70.200 -999.990 Z.. R2 1990 06 26 10 37 00 -14.2500 -170.5700 44.00 42.00 2.00 122899 SMO 1990 06 01 01 30 00 2087-66 S co CCGG 53.770 -999.990 S.. R2 1990 06 08 05 10 00 -14.2500 -170.5700 60.30 42.00 18.30 122900 SMO 1990 06 01 01 30 00 2087-66 S co CCGG 55.150 -999.990 S.. R2 1990 06 08 05 22 00 -14.2500 -170.5700 60.30 42.00 18.30 122900 SMO 1990 06 01 01 48 00 2021-66 P co CCGG 65.020 -999.990 ... R2 1990 06 08 05 29 00 -14.2500 -170.5700 45.00 42.00 3.00 122902 SMO 1990 06 01 01 48 00 2021-66 P co CCGG 67.010 -999.990 ... R2 1990 06 08 05 41 00 -14.2500 -170.5700 45.00 42.00 3.00 122902 SMO 1990 06 01 01 48 00 2021-66 P co CCGG 68.010 -999.990 ... R2 1990 06 08 05 54 00 -14.2500 -170.5700 45.00 42.00 3.00 122902 SMO 1990 06 01 01 48 00 3001-66 T co CCGG 62.540 -999.990 ... R2 1990 06 26 10 50 00 -14.2500 -170.5700 44.00 42.00 2.00 122904 SMO 1990 06 01 01 48 00 3001-66 T co CCGG 66.300 -999.990 ... R2 1990 06 26 11 04 00 -14.2500 -170.5700 44.00 42.00 2.00 122904 SMO 1990 06 01 01 48 00 3002-66 T co CCGG 59.810 -999.990 ... R2 1990 07 03 06 53 00 -14.2500 -170.5700 44.00 42.00 2.00 122905 SMO 1990 06 01 01 48 00 3002-66 T co CCGG -999.990 -999.990 *.. R2 1990 07 03 07 07 00 -14.2500 -170.5700 44.00 42.00 2.00 122905 SMO 1990 06 01 01 48 00 3002-66 T co CCGG 62.160 -999.990 ... R2 1990 07 03 07 20 00 -14.2500 -170.5700 44.00 42.00 2.00 122905 SMO 1990 06 07 23 05 00 2103-66 P co CCGG 62.870 -999.990 ..< R2 1990 06 07 05 09 00 -14.2500 -170.5700 45.00 42.00 3.00 122906 SMO 1990 06 07 23 05 00 2103-66 P co CCGG 63.000 -999.990 ... R2 1990 06 07 05 33 00 -14.2500 -170.5700 45.00 42.00 3.00 122906 SMO 1990 06 07 23 05 00 3151-66 T co CCGG -999.990 -999.990 *.. R2 1990 06 26 10 31 00 -14.2500 -170.5700 44.00 42.00 2.00 122908 SMO 1990 06 07 23 05 00 3151-66 T co CCGG -999.990 -999.990 *.. R2 1990 06 26 10 44 00 -14.2500 -170.5700 44.00 42.00 2.00 122908 SMO 1990 06 07 23 05 00 3151-66 T co CCGG -999.990 -999.990 *.. R2 1990 06 26 10 57 00 -14.2500 -170.5700 44.00 42.00 2.00 122908 SMO 1990 06 07 23 05 00 3152-66 T co CCGG 67.600 -999.990 ... R2 1990 07 03 07 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122909 SMO 1990 06 07 23 05 00 3152-66 T co CCGG 67.110 -999.990 ... R2 1990 07 03 07 14 00 -14.2500 -170.5700 44.00 42.00 2.00 122909 SMO 1990 06 08 00 08 00 2107-66 S co CCGG 104.580 -999.990 S.. R2 1990 06 07 09 13 00 -14.2500 -170.5700 60.30 42.00 18.30 122910 SMO 1990 06 14 22 20 00 2085-66 S co CCGG 58.260 -999.990 S.. R2 1990 06 26 08 55 00 -14.2500 -170.5700 60.30 42.00 18.30 122912 SMO 1990 06 14 22 20 00 2085-66 S co CCGG 55.340 -999.990 S.. R2 1990 06 26 09 08 00 -14.2500 -170.5700 60.30 42.00 18.30 122912 SMO 1990 06 14 22 20 00 2085-66 S co CCGG 64.480 -999.990 S.. R2 1990 06 26 09 21 00 -14.2500 -170.5700 60.30 42.00 18.30 122912 SMO 1990 06 14 22 40 00 2113-66 P co CCGG 59.230 -999.990 Z.. R2 1990 06 26 08 48 00 -14.2500 -170.5700 45.00 42.00 3.00 122914 SMO 1990 06 14 22 40 00 2113-66 P co CCGG 62.880 -999.990 ... R2 1990 06 26 09 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122914 SMO 1990 06 14 22 40 00 2113-66 P co CCGG 64.120 -999.990 ... R2 1990 06 26 09 15 00 -14.2500 -170.5700 45.00 42.00 3.00 122914 SMO 1990 06 14 22 40 00 2113-66 P co CCGG 66.950 -999.990 ... R2 1990 06 26 09 28 00 -14.2500 -170.5700 45.00 42.00 3.00 122914 SMO 1990 06 14 22 40 00 3149-66 T co CCGG 67.070 -999.990 P.. R2 1990 06 26 11 10 00 -14.2500 -170.5700 44.00 42.00 2.00 122916 SMO 1990 06 14 22 40 00 3149-66 T co CCGG 67.480 -999.990 P.. R2 1990 06 26 11 23 00 -14.2500 -170.5700 44.00 42.00 2.00 122916 SMO 1990 06 14 22 40 00 3150-66 T co CCGG 62.110 -999.990 P.. R2 1990 07 03 07 54 00 -14.2500 -170.5700 44.00 42.00 2.00 122917 SMO 1990 06 14 22 40 00 3150-66 T co CCGG 60.540 -999.990 P.. R2 1990 07 03 08 07 00 -14.2500 -170.5700 44.00 42.00 2.00 122917 SMO 1990 06 22 00 25 00 2057-66 S co CCGG 60.720 -999.990 S.. R2 1990 06 29 10 11 00 -14.2500 -170.5700 60.30 42.00 18.30 122918 SMO 1990 06 22 00 25 00 2057-66 S co CCGG 60.300 -999.990 S.. R2 1990 06 29 10 25 00 -14.2500 -170.5700 60.30 42.00 18.30 122918 SMO 1990 06 22 00 50 00 2153-66 P co CCGG 59.980 -999.990 ... R2 1990 06 29 10 38 00 -14.2500 -170.5700 45.00 42.00 3.00 122920 SMO 1990 06 22 00 50 00 2153-66 P co CCGG 59.090 -999.990 ... R2 1990 06 29 10 51 00 -14.2500 -170.5700 45.00 42.00 3.00 122920 SMO 1990 06 22 00 50 00 3033-66 T co CCGG 64.520 -999.990 P.. R2 1990 07 24 10 45 00 -14.2500 -170.5700 44.00 42.00 2.00 122922 SMO 1990 06 22 00 50 00 3033-66 T co CCGG 63.540 -999.990 P.. R2 1990 07 24 10 57 00 -14.2500 -170.5700 44.00 42.00 2.00 122922 SMO 1990 06 22 00 50 00 3033-66 T co CCGG 64.810 -999.990 P.. R2 1990 07 24 11 10 00 -14.2500 -170.5700 44.00 42.00 2.00 122922 SMO 1990 06 22 00 50 00 3034-66 T co CCGG 66.080 -999.990 P.. R2 1990 07 24 10 15 00 -14.2500 -170.5700 44.00 42.00 2.00 122923 SMO 1990 06 22 00 50 00 3034-66 T co CCGG 58.680 -999.990 P.. R2 1990 07 24 10 26 00 -14.2500 -170.5700 44.00 42.00 2.00 122923 SMO 1990 06 22 00 50 00 3034-66 T co CCGG 56.100 -999.990 P.. R2 1990 07 24 10 39 00 -14.2500 -170.5700 44.00 42.00 2.00 122923 SMO 1990 06 29 20 49 00 2121-66 S co CCGG 58.920 -999.990 S.. R2 1990 07 23 12 54 00 -14.2500 -170.5700 60.30 42.00 18.30 122924 SMO 1990 06 29 20 49 00 2121-66 S co CCGG 60.250 -999.990 S.. R2 1990 07 23 13 06 00 -14.2500 -170.5700 60.30 42.00 18.30 122924 SMO 1990 06 29 21 35 00 2053-66 P co CCGG 59.230 -999.990 ... R2 1990 07 23 13 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122926 SMO 1990 06 29 21 35 00 2053-66 P co CCGG 58.180 -999.990 ... R2 1990 07 23 13 12 00 -14.2500 -170.5700 45.00 42.00 3.00 122926 SMO 1990 06 29 21 35 00 3075-66 T co CCGG 56.100 -999.990 Z.. R2 1990 07 24 10 51 00 -14.2500 -170.5700 44.00 42.00 2.00 122928 SMO 1990 06 29 21 35 00 3075-66 T co CCGG 61.210 -999.990 ... R2 1990 07 24 11 04 00 -14.2500 -170.5700 44.00 42.00 2.00 122928 SMO 1990 06 29 21 35 00 3075-66 T co CCGG 60.550 -999.990 ... R2 1990 07 24 11 17 00 -14.2500 -170.5700 44.00 42.00 2.00 122928 SMO 1990 06 29 21 35 00 3076-66 T co CCGG 57.160 -999.990 ... R2 1990 07 24 10 09 00 -14.2500 -170.5700 44.00 42.00 2.00 122929 SMO 1990 06 29 21 35 00 3076-66 T co CCGG 59.780 -999.990 ... R2 1990 07 24 10 21 00 -14.2500 -170.5700 44.00 42.00 2.00 122929 SMO 1990 06 29 21 35 00 3076-66 T co CCGG 56.910 -999.990 ... R2 1990 07 24 10 33 00 -14.2500 -170.5700 44.00 42.00 2.00 122929 SMO 1990 07 06 00 30 00 2007-66 S co CCGG -999.990 -999.990 *.. R2 1990 07 11 09 20 00 -14.2500 -170.5700 60.30 42.00 18.30 122930 SMO 1990 07 06 00 30 00 2007-66 S co CCGG -999.990 -999.990 *.. R2 1990 07 11 09 31 00 -14.2500 -170.5700 60.30 42.00 18.30 122930 SMO 1990 07 06 00 50 00 2129-66 P co CCGG 58.870 -999.990 ... R2 1990 07 23 12 23 00 -14.2500 -170.5700 45.00 42.00 3.00 122932 SMO 1990 07 06 00 50 00 2129-66 P co CCGG 61.090 -999.990 ... R2 1990 07 23 12 35 00 -14.2500 -170.5700 45.00 42.00 3.00 122932 SMO 1990 07 06 00 50 00 2129-66 P co CCGG 59.970 -999.990 ... R2 1990 07 23 12 48 00 -14.2500 -170.5700 45.00 42.00 3.00 122932 SMO 1990 07 06 00 50 00 3023-66 T co CCGG 59.380 -999.990 P.. R2 1990 07 24 07 36 00 -14.2500 -170.5700 44.00 42.00 2.00 122934 SMO 1990 07 06 00 50 00 3023-66 T co CCGG 60.640 -999.990 P.. R2 1990 07 24 07 48 00 -14.2500 -170.5700 44.00 42.00 2.00 122934 SMO 1990 07 06 00 50 00 3023-66 T co CCGG 59.980 -999.990 P.. R2 1990 07 24 08 01 00 -14.2500 -170.5700 44.00 42.00 2.00 122934 SMO 1990 07 06 00 50 00 3024-66 T co CCGG 68.680 -999.990 P.. R2 1990 08 09 08 17 00 -14.2500 -170.5700 44.00 42.00 2.00 122935 SMO 1990 07 06 00 50 00 3024-66 T co CCGG 68.440 -999.990 P.. R2 1990 08 09 08 31 00 -14.2500 -170.5700 44.00 42.00 2.00 122935 SMO 1990 07 12 20 25 00 2183-66 S co CCGG 57.220 -999.990 S.. R2 1990 07 23 11 00 00 -14.2500 -170.5700 60.30 42.00 18.30 122936 SMO 1990 07 12 20 25 00 2183-66 S co CCGG -999.990 -999.990 *.. R2 1990 07 23 11 13 00 -14.2500 -170.5700 60.30 42.00 18.30 122936 SMO 1990 07 12 20 55 00 2188-66 P co CCGG 87.810 -999.990 .X. R2 1990 08 01 08 51 00 -14.2500 -170.5700 45.00 42.00 3.00 122938 SMO 1990 07 12 20 55 00 2188-66 P co CCGG 86.690 -999.990 .X. R2 1990 08 01 09 04 00 -14.2500 -170.5700 45.00 42.00 3.00 122938 SMO 1990 07 12 20 55 00 3095-66 T co CCGG 59.860 -999.990 ... R2 1990 07 24 07 29 00 -14.2500 -170.5700 44.00 42.00 2.00 122939 SMO 1990 07 12 20 55 00 3095-66 T co CCGG 60.150 -999.990 ... R2 1990 07 24 07 42 00 -14.2500 -170.5700 44.00 42.00 2.00 122939 SMO 1990 07 12 20 55 00 3096-66 T co CCGG 65.450 -999.990 ... R2 1990 08 09 08 43 00 -14.2500 -170.5700 44.00 42.00 2.00 122940 SMO 1990 07 12 20 55 00 3096-66 T co CCGG 63.340 -999.990 ... R2 1990 08 09 08 56 00 -14.2500 -170.5700 44.00 42.00 2.00 122940 SMO 1990 07 12 20 55 00 3096-66 T co CCGG 62.370 -999.990 ... R2 1990 08 09 09 09 00 -14.2500 -170.5700 44.00 42.00 2.00 122940 SMO 1990 07 20 21 47 00 2103-66 S co CCGG 64.230 -999.990 S.. R2 1990 08 01 09 17 00 -14.2500 -170.5700 60.30 42.00 18.30 122941 SMO 1990 07 20 21 47 00 2103-66 S co CCGG 63.930 -999.990 S.. R2 1990 08 01 09 30 00 -14.2500 -170.5700 60.30 42.00 18.30 122941 SMO 1990 07 20 22 15 00 3037-66 T co CCGG 62.570 -999.990 ... R2 1990 08 02 08 21 00 -14.2500 -170.5700 44.00 42.00 2.00 122944 SMO 1990 07 20 22 15 00 3037-66 T co CCGG 60.920 -999.990 ... R2 1990 08 02 08 34 00 -14.2500 -170.5700 44.00 42.00 2.00 122944 SMO 1990 07 20 22 15 00 3038-66 T co CCGG 64.160 -999.990 ... R2 1990 08 09 09 17 00 -14.2500 -170.5700 44.00 42.00 2.00 122945 SMO 1990 07 20 22 15 00 3038-66 T co CCGG 67.320 -999.990 ... R2 1990 08 09 09 23 00 -14.2500 -170.5700 44.00 42.00 2.00 122945 SMO 1990 07 20 22 15 00 3038-66 T co CCGG 63.850 -999.990 ... R2 1990 08 09 09 28 00 -14.2500 -170.5700 44.00 42.00 2.00 122945 SMO 1990 07 26 21 40 00 2165-66 S co CCGG 60.320 -999.990 S.. R2 1990 08 01 08 02 00 -14.2500 -170.5700 60.30 42.00 18.30 122946 SMO 1990 07 26 21 40 00 2165-66 S co CCGG 64.800 -999.990 S.. R2 1990 08 01 08 15 00 -14.2500 -170.5700 60.30 42.00 18.30 122946 SMO 1990 07 26 21 40 00 2165-66 S co CCGG 61.160 -999.990 S.. R2 1990 08 01 08 29 00 -14.2500 -170.5700 60.30 42.00 18.30 122946 SMO 1990 07 26 22 05 00 2167-66 P co CCGG 67.050 -999.990 ... R2 1990 08 02 07 22 00 -14.2500 -170.5700 45.00 42.00 3.00 122948 SMO 1990 07 26 22 05 00 3063-66 T co CCGG 69.610 -999.990 P.. R2 1990 08 02 08 14 00 -14.2500 -170.5700 44.00 42.00 2.00 122949 SMO 1990 07 26 22 05 00 3063-66 T co CCGG 70.650 -999.990 P.. R2 1990 08 02 08 28 00 -14.2500 -170.5700 44.00 42.00 2.00 122949 SMO 1990 07 26 22 05 00 3064-66 T co CCGG 77.880 -999.990 P.. R2 1990 08 09 08 50 00 -14.2500 -170.5700 44.00 42.00 2.00 122950 SMO 1990 07 26 22 05 00 3064-66 T co CCGG 76.100 -999.990 P.. R2 1990 08 09 09 02 00 -14.2500 -170.5700 44.00 42.00 2.00 122950 SMO 1990 08 02 22 10 00 2177-66 S co CCGG 67.520 -999.990 S.. R2 1990 08 09 07 32 00 -14.2500 -170.5700 60.30 42.00 18.30 122951 SMO 1990 08 02 22 10 00 2177-66 S co CCGG 68.330 -999.990 S.. R2 1990 08 09 07 38 00 -14.2500 -170.5700 60.30 42.00 18.30 122951 SMO 1990 08 02 22 43 00 2179-66 P co CCGG 68.470 -999.990 ... R2 1990 08 09 07 02 00 -14.2500 -170.5700 45.00 42.00 3.00 122953 SMO 1990 08 02 22 43 00 2179-66 P co CCGG 69.790 -999.990 ... R2 1990 08 09 07 14 00 -14.2500 -170.5700 45.00 42.00 3.00 122953 SMO 1990 08 02 22 43 00 2179-66 P co CCGG 69.740 -999.990 ... R2 1990 08 09 07 26 00 -14.2500 -170.5700 45.00 42.00 3.00 122953 SMO 1990 08 02 22 43 00 3027-66 T co CCGG 72.260 -999.990 ... R2 1990 08 30 07 20 00 -14.2500 -170.5700 44.00 42.00 2.00 122955 SMO 1990 08 02 22 43 00 3027-66 T co CCGG 74.510 -999.990 ... R2 1990 08 30 07 34 00 -14.2500 -170.5700 44.00 42.00 2.00 122955 SMO 1990 08 02 22 43 00 3027-66 T co CCGG 68.640 -999.990 ... R2 1990 08 30 07 49 00 -14.2500 -170.5700 44.00 42.00 2.00 122955 SMO 1990 08 02 22 43 00 3028-66 T co CCGG 70.970 -999.990 R.. R2 1990 08 31 08 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122956 SMO 1990 08 02 22 43 00 3028-66 T co CCGG 74.740 -999.990 R.. R2 1990 08 31 08 01 00 -14.2500 -170.5700 44.00 42.00 2.00 122956 SMO 1990 08 02 22 43 00 3028-66 T co CCGG 74.810 -999.990 R.. R2 1990 08 31 08 02 00 -14.2500 -170.5700 44.00 42.00 2.00 122956 SMO 1990 08 11 01 20 00 2021-66 S co CCGG 67.250 -999.990 S.. R2 1990 08 24 10 01 00 -14.2500 -170.5700 60.30 42.00 18.30 122957 SMO 1990 08 11 01 20 00 2021-66 S co CCGG 68.330 -999.990 S.. R2 1990 08 24 10 15 00 -14.2500 -170.5700 60.30 42.00 18.30 122957 SMO 1990 08 11 01 40 00 2065-66 P co CCGG 67.430 -999.990 ... R2 1990 08 24 09 29 00 -14.2500 -170.5700 45.00 42.00 3.00 122959 SMO 1990 08 11 01 40 00 2065-66 P co CCGG 69.520 -999.990 ... R2 1990 08 24 09 42 00 -14.2500 -170.5700 45.00 42.00 3.00 122959 SMO 1990 08 11 01 40 00 2065-66 P co CCGG 68.940 -999.990 ... R2 1990 08 24 09 55 00 -14.2500 -170.5700 45.00 42.00 3.00 122959 SMO 1990 08 11 01 40 00 3103-66 T co CCGG 67.960 -999.990 ... R2 1990 08 30 07 13 00 -14.2500 -170.5700 44.00 42.00 2.00 122961 SMO 1990 08 11 01 40 00 3103-66 T co CCGG 68.320 -999.990 ... R2 1990 08 30 07 27 00 -14.2500 -170.5700 44.00 42.00 2.00 122961 SMO 1990 08 11 01 40 00 3104-66 T co CCGG 65.700 -999.990 R.. R2 1990 08 31 08 00 00 -14.2500 -170.5700 44.00 42.00 2.00 122962 SMO 1990 08 16 21 45 00 2171-66 S co CCGG 54.500 -999.990 S.. R2 1990 08 24 07 05 00 -14.2500 -170.5700 60.30 42.00 18.30 122963 SMO 1990 08 16 21 45 00 2171-66 S co CCGG 64.820 -999.990 S.. R2 1990 08 24 07 18 00 -14.2500 -170.5700 60.30 42.00 18.30 122963 SMO 1990 08 16 21 45 00 2171-66 S co CCGG 61.420 -999.990 S.. R2 1990 08 24 07 32 00 -14.2500 -170.5700 60.30 42.00 18.30 122963 SMO 1990 08 16 21 45 00 2171-66 S co CCGG 63.850 -999.990 S.. R2 1990 08 24 07 44 00 -14.2500 -170.5700 60.30 42.00 18.30 122963 SMO 1990 08 16 22 24 00 2081-66 P co CCGG 67.270 -999.990 ... R2 1990 08 24 06 59 00 -14.2500 -170.5700 45.00 42.00 3.00 122965 SMO 1990 08 16 22 24 00 2081-66 P co CCGG 66.160 -999.990 ... R2 1990 08 24 07 12 00 -14.2500 -170.5700 45.00 42.00 3.00 122965 SMO 1990 08 16 22 24 00 3067-66 T co CCGG 64.250 -999.990 ... R2 1990 08 30 09 46 00 -14.2500 -170.5700 44.00 42.00 2.00 122967 SMO 1990 08 16 22 24 00 3068-66 T co CCGG 64.400 -999.990 ... R2 1990 10 05 07 19 00 -14.2500 -170.5700 44.00 42.00 2.00 122968 SMO 1990 08 16 22 24 00 3068-66 T co CCGG 65.980 -999.990 ... R2 1990 10 05 07 33 00 -14.2500 -170.5700 44.00 42.00 2.00 122968 SMO 1990 08 24 00 10 00 2003-66 S co CCGG 61.130 -999.990 R.. R2 1990 08 31 08 00 00 -14.2500 -170.5700 60.30 42.00 18.30 122969 SMO 1990 08 24 00 10 00 2003-66 S co CCGG 62.810 -999.990 R.. R2 1990 08 31 08 01 00 -14.2500 -170.5700 60.30 42.00 18.30 122969 SMO 1990 08 24 00 30 00 2135-66 P co CCGG 61.600 -999.990 R.. R2 1990 08 31 08 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122971 SMO 1990 08 24 00 30 00 2135-66 P co CCGG 65.380 -999.990 R.. R2 1990 08 31 08 01 00 -14.2500 -170.5700 45.00 42.00 3.00 122971 SMO 1990 08 24 00 30 00 2135-66 P co CCGG 65.460 -999.990 R.. R2 1990 08 31 08 02 00 -14.2500 -170.5700 45.00 42.00 3.00 122971 SMO 1990 08 24 00 30 00 3071-66 T co CCGG 71.460 -999.990 Z.. R2 1990 08 30 10 21 00 -14.2500 -170.5700 44.00 42.00 2.00 122973 SMO 1990 08 24 00 30 00 3071-66 T co CCGG 66.940 -999.990 Z.. R2 1990 08 30 10 35 00 -14.2500 -170.5700 44.00 42.00 2.00 122973 SMO 1990 08 24 00 30 00 3072-66 T co CCGG 68.790 -999.990 ... R2 1990 10 05 07 47 00 -14.2500 -170.5700 44.00 42.00 2.00 122974 SMO 1990 08 24 00 30 00 3072-66 T co CCGG 67.100 -999.990 ... R2 1990 10 05 08 01 00 -14.2500 -170.5700 44.00 42.00 2.00 122974 SMO 1990 08 30 23 25 00 2123-66 S co CCGG 63.430 -999.990 S.. R2 1990 09 05 10 02 00 -14.2500 -170.5700 60.30 42.00 18.30 122975 SMO 1990 08 30 23 25 00 2123-66 S co CCGG 65.790 -999.990 S.. R2 1990 09 05 10 16 00 -14.2500 -170.5700 60.30 42.00 18.30 122975 SMO 1990 08 30 23 55 00 2243-66 P co CCGG -999.990 -999.990 *.. R2 1990 09 05 09 41 00 -14.2500 -170.5700 45.00 42.00 3.00 122977 SMO 1990 08 30 23 55 00 2243-66 P co CCGG 71.500 -999.990 ... R2 1990 09 05 09 55 00 -14.2500 -170.5700 45.00 42.00 3.00 122977 SMO 1990 08 30 23 55 00 3033-66 T co CCGG 75.920 -999.990 ... R2 1990 10 05 11 09 00 -14.2500 -170.5700 44.00 42.00 2.00 122979 SMO 1990 08 30 23 55 00 3033-66 T co CCGG 77.040 -999.990 ... R2 1990 10 05 11 25 00 -14.2500 -170.5700 44.00 42.00 2.00 122979 SMO 1990 08 30 23 55 00 3034-66 T co CCGG 64.950 -999.990 Z.. R2 1990 10 05 07 40 00 -14.2500 -170.5700 44.00 42.00 2.00 122980 SMO 1990 08 30 23 55 00 3034-66 T co CCGG 69.550 -999.990 Z.. R2 1990 10 05 07 54 00 -14.2500 -170.5700 44.00 42.00 2.00 122980 SMO 1990 09 08 02 50 00 2111-66 P co CCGG 64.020 -999.990 ... R2 1990 09 14 22 00 00 -14.2500 -170.5700 45.00 42.00 3.00 122981 SMO 1990 09 08 02 50 00 3075-66 T co CCGG 66.520 -999.990 ... R2 1990 10 05 11 16 00 -14.2500 -170.5700 44.00 42.00 2.00 122983 SMO 1990 09 08 02 50 00 3075-66 T co CCGG 69.050 -999.990 ... R2 1990 10 05 11 32 00 -14.2500 -170.5700 44.00 42.00 2.00 122983 SMO 1990 09 08 02 50 00 3076-66 T co CCGG 68.740 -999.990 ... R2 1990 10 05 07 12 00 -14.2500 -170.5700 44.00 42.00 2.00 122984 SMO 1990 09 08 02 50 00 3076-66 T co CCGG 65.400 -999.990 ... R2 1990 10 05 07 26 00 -14.2500 -170.5700 44.00 42.00 2.00 122984 SMO 1990 09 08 03 30 00 2125-66 S co CCGG 63.870 -999.990 S.. R2 1990 09 14 22 07 00 -14.2500 -170.5700 60.30 42.00 18.30 122985 SMO 1990 09 13 22 47 00 2023-66 S co CCGG -999.990 -999.990 *.. R2 1990 10 01 13 06 00 -14.2500 -170.5700 60.30 42.00 18.30 122987 SMO 1990 09 13 23 28 00 2091-66 P co CCGG 73.820 -999.990 ... R2 1990 10 01 11 35 00 -14.2500 -170.5700 45.00 42.00 3.00 122989 SMO 1990 09 13 23 28 00 2091-66 P co CCGG 74.280 -999.990 ... R2 1990 10 01 11 49 00 -14.2500 -170.5700 45.00 42.00 3.00 122989 SMO 1990 09 13 23 28 00 2091-66 P co CCGG 75.620 -999.990 ... R2 1990 10 01 11 56 00 -14.2500 -170.5700 45.00 42.00 3.00 122989 SMO 1990 09 13 23 28 00 3041-66 T co CCGG 66.870 -999.990 ... R2 1990 10 03 10 10 00 -14.2500 -170.5700 44.00 42.00 2.00 122990 SMO 1990 09 13 23 28 00 3041-66 T co CCGG 63.990 -999.990 ... R2 1990 10 03 10 24 00 -14.2500 -170.5700 44.00 42.00 2.00 122990 SMO 1990 09 13 23 28 00 3042-66 T co CCGG 64.680 -999.990 ... R2 1990 10 03 10 52 00 -14.2500 -170.5700 44.00 42.00 2.00 122991 SMO 1990 09 20 23 12 00 2179-66 S co CCGG 62.400 -999.990 S.. R2 1990 10 01 11 00 00 -14.2500 -170.5700 60.30 42.00 18.30 122992 SMO 1990 09 20 23 12 00 2179-66 S co CCGG 61.000 -999.990 S.. R2 1990 10 01 11 14 00 -14.2500 -170.5700 60.30 42.00 18.30 122992 SMO 1990 09 20 23 50 00 3057-66 T co CCGG 82.040 -999.990 P.. R2 1990 10 03 09 48 00 -14.2500 -170.5700 44.00 42.00 2.00 122993 SMO 1990 09 20 23 50 00 3057-66 T co CCGG 84.090 -999.990 P.. R2 1990 10 03 10 03 00 -14.2500 -170.5700 44.00 42.00 2.00 122993 SMO 1990 09 20 23 50 00 3057-66 T co CCGG 85.010 -999.990 P.. R2 1990 10 03 10 17 00 -14.2500 -170.5700 44.00 42.00 2.00 122993 SMO 1990 09 20 23 50 00 3058-66 T co CCGG 67.110 -999.990 P.. R2 1990 10 03 10 45 00 -14.2500 -170.5700 44.00 42.00 2.00 122994 SMO 1990 09 28 23 30 00 2001-66 S co CCGG 73.340 -999.990 S.. R2 1990 10 26 07 24 00 -14.2500 -170.5700 60.30 42.00 18.30 122995 SMO 1990 09 28 23 30 00 2001-66 S co CCGG 69.290 -999.990 S.. R2 1990 10 26 07 42 00 -14.2500 -170.5700 60.30 42.00 18.30 122995 SMO 1990 09 28 23 30 00 2001-66 S co CCGG 71.430 -999.990 S.. R2 1990 10 26 08 01 00 -14.2500 -170.5700 60.30 42.00 18.30 122995 SMO 1990 09 28 23 59 00 2181-66 P co CCGG 79.000 -999.990 ... R2 1990 10 26 06 56 00 -14.2500 -170.5700 45.00 42.00 3.00 122997 SMO 1990 09 28 23 59 00 2181-66 P co CCGG 78.760 -999.990 ... R2 1990 10 26 07 14 00 -14.2500 -170.5700 45.00 42.00 3.00 122997 SMO 1990 09 28 23 59 00 3099-66 T co CCGG 67.040 -999.990 ... R2 1990 10 05 08 38 00 -14.2500 -170.5700 44.00 42.00 2.00 122999 SMO 1990 09 28 23 59 00 3099-66 T co CCGG 68.480 -999.990 ... R2 1990 10 05 08 52 00 -14.2500 -170.5700 44.00 42.00 2.00 122999 SMO 1990 09 28 23 59 00 3100-66 T co CCGG 67.690 -999.990 ... R2 1990 10 12 11 34 00 -14.2500 -170.5700 44.00 42.00 2.00 123000 SMO 1990 09 28 23 59 00 3100-66 T co CCGG -999.990 -999.990 *.. R2 1990 10 12 11 43 00 -14.2500 -170.5700 44.00 42.00 2.00 123000 SMO 1990 10 05 00 37 00 2089-66 P co CCGG 66.790 -999.990 ... R2 1990 11 01 11 30 00 -14.2500 -170.5700 45.00 42.00 3.00 123001 SMO 1990 10 05 00 37 00 2089-66 P co CCGG 65.450 -999.990 ... R2 1990 11 01 11 49 00 -14.2500 -170.5700 45.00 42.00 3.00 123001 SMO 1990 10 05 00 37 00 3017-66 T co CCGG 67.940 -999.990 ... R2 1990 10 29 12 29 00 -14.2500 -170.5700 44.00 42.00 2.00 123003 SMO 1990 10 05 00 37 00 3017-66 T co CCGG 70.200 -999.990 ... R2 1990 10 29 12 49 00 -14.2500 -170.5700 44.00 42.00 2.00 123003 SMO 1990 10 05 00 37 00 3017-66 T co CCGG -999.990 -999.990 *.. R2 1990 10 29 13 08 00 -14.2500 -170.5700 44.00 42.00 2.00 123003 SMO 1990 10 05 00 37 00 3018-66 T co CCGG 73.380 -999.990 ... R2 1990 10 29 10 44 00 -14.2500 -170.5700 44.00 42.00 2.00 123004 SMO 1990 10 05 00 37 00 3018-66 T co CCGG 70.480 -999.990 ... R2 1990 10 29 11 03 00 -14.2500 -170.5700 44.00 42.00 2.00 123004 SMO 1990 10 05 01 30 00 2007-66 S co CCGG -999.990 -999.990 *.. R2 1990 11 01 11 40 00 -14.2500 -170.5700 60.30 42.00 18.30 123005 SMO 1990 10 05 01 30 00 2007-66 S co CCGG 64.900 -999.990 S.. R2 1990 11 01 11 58 00 -14.2500 -170.5700 60.30 42.00 18.30 123005 SMO 1990 10 05 01 30 00 2007-66 S co CCGG 61.970 -999.990 S.. R2 1990 11 01 12 16 00 -14.2500 -170.5700 60.30 42.00 18.30 123005 SMO 1990 10 11 22 20 00 2219-66 S co CCGG 79.350 -999.990 S.. R2 1990 10 26 08 19 00 -14.2500 -170.5700 60.30 42.00 18.30 123007 SMO 1990 10 11 22 20 00 2219-66 S co CCGG 65.150 -999.990 S.. R2 1990 10 26 08 38 00 -14.2500 -170.5700 60.30 42.00 18.30 123007 SMO 1990 10 11 22 20 00 2219-66 S co CCGG 66.510 -999.990 S.. R2 1990 10 26 08 57 00 -14.2500 -170.5700 60.30 42.00 18.30 123007 SMO 1990 10 11 22 45 00 2223-66 P co CCGG 73.460 -999.990 ... R2 1990 10 26 08 10 00 -14.2500 -170.5700 47.00 42.00 5.00 123009 SMO 1990 10 11 22 45 00 2223-66 P co CCGG 72.260 -999.990 ... R2 1990 10 26 08 28 00 -14.2500 -170.5700 47.00 42.00 5.00 123009 SMO 1990 10 11 22 45 00 3045-66 T co CCGG 66.250 -999.990 ... R2 1990 10 29 12 20 00 -14.2500 -170.5700 44.00 42.00 2.00 123011 SMO 1990 10 11 22 45 00 3045-66 T co CCGG 68.700 -999.990 ... R2 1990 10 29 12 40 00 -14.2500 -170.5700 44.00 42.00 2.00 123011 SMO 1990 10 11 22 45 00 3046-66 T co CCGG 64.950 -999.990 ... R2 1990 10 29 10 34 00 -14.2500 -170.5700 44.00 42.00 2.00 123012 SMO 1990 10 11 22 45 00 3046-66 T co CCGG 68.250 -999.990 ... R2 1990 10 29 10 53 00 -14.2500 -170.5700 44.00 42.00 2.00 123012 SMO 1990 10 20 02 05 00 2189-66 S co CCGG 63.780 -999.990 S.. R2 1990 10 26 07 33 00 -14.2500 -170.5700 60.30 42.00 18.30 123013 SMO 1990 10 20 02 05 00 2189-66 S co CCGG 62.630 -999.990 S.. R2 1990 10 26 07 51 00 -14.2500 -170.5700 60.30 42.00 18.30 123013 SMO 1990 10 20 02 55 00 2011-66 P co CCGG 68.840 -999.990 ... R2 1990 10 26 10 03 00 -14.2500 -170.5700 47.00 42.00 5.00 123015 SMO 1990 10 20 02 55 00 2011-66 P co CCGG 69.550 -999.990 ... R2 1990 10 26 10 21 00 -14.2500 -170.5700 47.00 42.00 5.00 123015 SMO 1990 10 20 02 55 00 3081-66 T co CCGG 66.790 -999.990 ... R2 1990 11 17 09 10 00 -14.2500 -170.5700 44.00 42.00 2.00 123017 SMO 1990 10 20 02 55 00 3081-66 T co CCGG 66.800 -999.990 ... R2 1990 11 17 09 31 00 -14.2500 -170.5700 44.00 42.00 2.00 123017 SMO 1990 10 20 02 55 00 3082-66 T co CCGG 73.230 -999.990 Z.. R2 1990 11 19 11 22 00 -14.2500 -170.5700 44.00 42.00 2.00 123018 SMO 1990 10 20 02 55 00 3082-66 T co CCGG 64.610 -999.990 Z.. R2 1990 11 19 11 42 00 -14.2500 -170.5700 44.00 42.00 2.00 123018 SMO 1990 10 30 01 20 00 2171-66 S co CCGG 65.360 -999.990 S.. R2 1990 11 13 15 15 00 -14.2500 -170.5700 60.30 42.00 18.30 123019 SMO 1990 10 30 01 20 00 2171-66 S co CCGG 68.070 -999.990 S.. R2 1990 11 13 15 35 00 -14.2500 -170.5700 60.30 42.00 18.30 123019 SMO 1990 10 30 01 55 00 2029-66 P co CCGG 74.530 -999.990 ... R2 1990 11 13 14 28 00 -14.2500 -170.5700 47.00 42.00 5.00 123021 SMO 1990 10 30 01 55 00 2029-66 P co CCGG 72.730 -999.990 ... R2 1990 11 13 14 47 00 -14.2500 -170.5700 47.00 42.00 5.00 123021 SMO 1990 10 30 01 55 00 3101-66 T co CCGG 75.510 -999.990 ... R2 1990 11 17 09 50 00 -14.2500 -170.5700 44.00 42.00 2.00 123023 SMO 1990 10 30 01 55 00 3101-66 T co CCGG 75.210 -999.990 ... R2 1990 11 17 10 09 00 -14.2500 -170.5700 44.00 42.00 2.00 123023 SMO 1990 10 30 01 55 00 3102-66 T co CCGG 72.080 -999.990 ... R2 1990 11 19 10 51 00 -14.2500 -170.5700 44.00 42.00 2.00 123024 SMO 1990 10 30 01 55 00 3102-66 T co CCGG 71.400 -999.990 ... R2 1990 11 19 11 11 00 -14.2500 -170.5700 44.00 42.00 2.00 123024 SMO 1990 11 02 22 55 00 2187-66 P co CCGG 76.110 -999.990 ... R2 1990 11 14 10 45 00 -14.2500 -170.5700 47.00 42.00 5.00 123027 SMO 1990 11 02 22 55 00 2187-66 P co CCGG 74.920 -999.990 ... R2 1990 11 14 11 02 00 -14.2500 -170.5700 47.00 42.00 5.00 123027 SMO 1990 11 02 22 55 00 3053-66 T co CCGG 65.610 -999.990 P.. R2 1990 11 19 08 20 00 -14.2500 -170.5700 44.00 42.00 2.00 123029 SMO 1990 11 02 22 55 00 3053-66 T co CCGG 65.510 -999.990 P.. R2 1990 11 19 08 39 00 -14.2500 -170.5700 44.00 42.00 2.00 123029 SMO 1990 11 02 22 55 00 3054-66 T co CCGG 86.460 -999.990 P.. R2 1990 11 28 08 55 00 -14.2500 -170.5700 44.00 42.00 2.00 123030 SMO 1990 11 09 00 15 00 2201-66 S co CCGG 65.970 -999.990 S.. R2 1990 11 14 10 37 00 -14.2500 -170.5700 60.30 42.00 18.30 123031 SMO 1990 11 09 00 15 00 2201-66 S co CCGG 66.180 -999.990 S.. R2 1990 11 14 10 54 00 -14.2500 -170.5700 60.30 42.00 18.30 123031 SMO 1990 11 09 00 50 00 2102-66 P co CCGG 69.770 -999.990 ..> R2 1990 11 28 10 57 00 -14.2500 -170.5700 47.00 42.00 5.00 123033 SMO 1990 11 09 00 50 00 2102-66 P co CCGG 72.580 -999.990 ... R2 1990 11 28 11 15 00 -14.2500 -170.5700 47.00 42.00 5.00 123033 SMO 1990 11 09 00 50 00 3091-66 T co CCGG 62.190 -999.990 ... R2 1990 11 19 09 29 00 -14.2500 -170.5700 44.00 42.00 2.00 123034 SMO 1990 11 09 00 50 00 3091-66 T co CCGG 60.910 -999.990 ... R2 1990 11 19 09 47 00 -14.2500 -170.5700 44.00 42.00 2.00 123034 SMO 1990 11 17 01 00 00 2043-66 S co CCGG -999.990 -999.990 *.. R2 1990 11 28 10 22 00 -14.2500 -170.5700 60.30 42.00 18.30 123036 SMO 1990 11 17 01 00 00 2043-66 S co CCGG 57.880 -999.990 S.. R2 1990 11 28 10 39 00 -14.2500 -170.5700 60.30 42.00 18.30 123036 SMO 1990 11 17 01 45 00 2191-66 P co CCGG 67.700 -999.990 P.. R2 1990 11 28 09 13 00 -14.2500 -170.5700 47.00 42.00 5.00 123038 SMO 1990 11 17 01 45 00 2191-66 P co CCGG 66.600 -999.990 P.. R2 1990 11 28 09 29 00 -14.2500 -170.5700 47.00 42.00 5.00 123038 SMO 1990 11 17 01 45 00 2192-66 P co CCGG 73.470 -999.990 P.. R4 1990 11 29 13 53 00 -14.2500 -170.5700 47.00 42.00 5.00 123039 SMO 1990 11 17 01 45 00 3039-66 T co CCGG 66.140 -999.990 ... R4 1990 12 18 18 47 00 -14.2500 -170.5700 44.00 42.00 2.00 123040 SMO 1990 11 17 01 45 00 3039-66 T co CCGG 67.200 -999.990 ... R4 1990 12 18 19 05 00 -14.2500 -170.5700 44.00 42.00 2.00 123040 SMO 1990 11 17 01 45 00 3040-66 T co CCGG 68.360 -999.990 ... R4 1990 12 19 16 27 00 -14.2500 -170.5700 44.00 42.00 2.00 123041 SMO 1990 11 17 01 45 00 3040-66 T co CCGG 67.370 -999.990 ... R4 1990 12 19 16 46 00 -14.2500 -170.5700 44.00 42.00 2.00 123041 SMO 1990 11 23 22 52 00 3023-66 T co CCGG 70.200 -999.990 ... R4 1990 12 19 09 48 00 -14.2500 -170.5700 44.00 42.00 2.00 123046 SMO 1990 11 23 22 52 00 3023-66 T co CCGG 69.490 -999.990 ... R4 1990 12 19 10 06 00 -14.2500 -170.5700 44.00 42.00 2.00 123046 SMO 1990 11 23 22 52 00 3024-66 T co CCGG 71.420 -999.990 ... R4 1990 12 19 17 04 00 -14.2500 -170.5700 44.00 42.00 2.00 123047 SMO 1990 11 23 22 52 00 3024-66 T co CCGG 70.240 -999.990 ... R4 1990 12 19 17 23 00 -14.2500 -170.5700 44.00 42.00 2.00 123047 SMO 1990 12 03 22 10 00 2228-66 S co CCGG 65.370 -999.990 S.. R4 1990 12 21 09 34 00 -14.2500 -170.5700 60.30 42.00 18.30 123049 SMO 1990 12 03 22 10 00 2228-66 S co CCGG 64.520 -999.990 S.. R4 1990 12 21 09 50 00 -14.2500 -170.5700 60.30 42.00 18.30 123049 SMO 1990 12 03 22 40 00 3061-66 T co CCGG 65.930 -999.990 ... R4 1990 12 19 20 41 00 -14.2500 -170.5700 44.00 42.00 2.00 123050 SMO 1990 12 03 22 40 00 3061-66 T co CCGG 65.680 -999.990 ... R4 1990 12 19 20 58 00 -14.2500 -170.5700 44.00 42.00 2.00 123050 SMO 1990 12 03 22 40 00 3062-66 T co CCGG 65.910 -999.990 ... R4 1990 12 19 20 06 00 -14.2500 -170.5700 44.00 42.00 2.00 123051 SMO 1990 12 03 22 40 00 3062-66 T co CCGG 65.500 -999.990 ... R4 1990 12 19 20 23 00 -14.2500 -170.5700 44.00 42.00 2.00 123051 SMO 1990 12 03 22 45 00 2122-66 P co CCGG 73.900 -999.990 ... R4 1990 12 21 09 01 00 -14.2500 -170.5700 47.00 42.00 5.00 123053 SMO 1990 12 03 22 45 00 2122-66 P co CCGG 73.550 -999.990 ... R4 1990 12 21 09 18 00 -14.2500 -170.5700 47.00 42.00 5.00 123053 SMO 1990 12 06 23 13 00 2226-66 S co CCGG 71.950 -999.990 S.. R4 1990 12 26 11 18 00 -14.2500 -170.5700 60.30 42.00 18.30 123054 SMO 1990 12 06 23 13 00 2226-66 S co CCGG 72.970 -999.990 S.. R4 1990 12 26 11 34 00 -14.2500 -170.5700 60.30 42.00 18.30 123054 SMO 1990 12 06 23 45 00 2048-66 P co CCGG 68.210 -999.990 ... R4 1990 12 26 10 45 00 -14.2500 -170.5700 47.00 42.00 5.00 123057 SMO 1990 12 06 23 45 00 2048-66 P co CCGG 66.680 -999.990 ... R4 1990 12 26 11 01 00 -14.2500 -170.5700 47.00 42.00 5.00 123057 SMO 1990 12 06 23 45 00 3143-66 T co CCGG 63.330 -999.990 ... R4 1990 12 19 19 30 00 -14.2500 -170.5700 44.00 42.00 2.00 123058 SMO 1990 12 06 23 45 00 3143-66 T co CCGG -999.990 -999.990 *.. R4 1990 12 19 19 48 00 -14.2500 -170.5700 44.00 42.00 2.00 123058 SMO 1990 12 06 23 45 00 3144-66 T co CCGG -999.990 -999.990 *.. R4 1990 12 20 10 35 00 -14.2500 -170.5700 44.00 42.00 2.00 123059 SMO 1990 12 06 23 45 00 3144-66 T co CCGG 63.760 -999.990 ... R4 1990 12 20 10 53 00 -14.2500 -170.5700 44.00 42.00 2.00 123059 SMO 1990 12 15 23 30 00 2060-66 P co CCGG 64.770 -999.990 Z.. R4 1991 01 03 09 50 00 -14.2500 -170.5700 47.00 42.00 5.00 123061 SMO 1990 12 15 23 30 00 2060-66 P co CCGG 67.460 -999.990 Z.. R4 1991 01 03 10 08 00 -14.2500 -170.5700 47.00 42.00 5.00 123061 SMO 1990 12 15 23 30 00 3059-66 T co CCGG -999.990 -999.990 *.. R4 1991 01 07 17 45 00 -14.2500 -170.5700 44.00 42.00 2.00 123062 SMO 1990 12 15 23 30 00 3059-66 T co CCGG -999.990 -999.990 *.. R4 1991 01 07 18 03 00 -14.2500 -170.5700 44.00 42.00 2.00 123062 SMO 1990 12 15 23 30 00 3060-66 T co CCGG 61.870 -999.990 ... R4 1991 01 07 20 38 00 -14.2500 -170.5700 44.00 42.00 2.00 123063 SMO 1990 12 15 23 30 00 3060-66 T co CCGG -999.990 -999.990 *.. R4 1991 01 07 20 56 00 -14.2500 -170.5700 44.00 42.00 2.00 123063 SMO 1990 12 16 00 25 00 2058-66 S co CCGG 63.270 -999.990 S.. R4 1991 01 03 09 17 00 -14.2500 -170.5700 60.30 42.00 18.30 123065 SMO 1990 12 16 00 25 00 2058-66 S co CCGG -999.990 -999.990 *.. R4 1991 01 03 09 33 00 -14.2500 -170.5700 60.30 42.00 18.30 123065 SMO 1990 12 24 21 20 00 2138-66 S co CCGG 80.290 -999.990 S.. R4 1991 01 08 10 34 00 -14.2500 -170.5700 60.30 42.00 18.30 123067 SMO 1990 12 24 21 20 00 2138-66 S co CCGG 80.160 -999.990 S.. R4 1991 01 08 10 51 00 -14.2500 -170.5700 60.30 42.00 18.30 123067 SMO 1990 12 24 21 55 00 2128-66 P co CCGG 86.270 -999.990 .X. R4 1991 01 08 14 37 00 -14.2500 -170.5700 47.00 42.00 5.00 123069 SMO 1990 12 24 21 55 00 2128-66 P co CCGG 86.630 -999.990 .X. R4 1991 01 08 14 55 00 -14.2500 -170.5700 47.00 42.00 5.00 123069 SMO 1990 12 24 21 55 00 3069-66 T co CCGG 82.950 -999.990 .X. R4 1991 01 07 19 28 00 -14.2500 -170.5700 44.00 42.00 2.00 123070 SMO 1990 12 24 21 55 00 3069-66 T co CCGG 80.840 -999.990 .X. R4 1991 01 07 19 46 00 -14.2500 -170.5700 44.00 42.00 2.00 123070 SMO 1990 12 24 21 55 00 3070-66 T co CCGG 80.540 -999.990 .X. R4 1991 01 07 20 03 00 -14.2500 -170.5700 44.00 42.00 2.00 123071 SMO 1990 12 24 21 55 00 3070-66 T co CCGG 79.860 -999.990 .X. R4 1991 01 07 20 21 00 -14.2500 -170.5700 44.00 42.00 2.00 123071 SMO 1990 12 27 03 10 00 2046-66 P co CCGG 81.460 -999.990 .X. R4 1991 01 10 12 56 00 -14.2500 -170.5700 47.00 42.00 5.00 123073 SMO 1990 12 27 03 10 00 2046-66 P co CCGG 81.000 -999.990 .X. R4 1991 01 10 13 14 00 -14.2500 -170.5700 47.00 42.00 5.00 123073 SMO 1990 12 28 01 22 00 2036-66 S co CCGG 74.820 -999.990 S.. R4 1991 01 14 15 41 00 -14.2500 -170.5700 60.30 42.00 18.30 123075 SMO 1990 12 28 01 22 00 2036-66 S co CCGG 73.460 -999.990 S.. R4 1991 01 14 15 58 00 -14.2500 -170.5700 60.30 42.00 18.30 123075 SMO 1990 12 28 01 50 00 2094-66 P co CCGG 78.460 -999.990 ... R4 1991 01 14 14 50 00 -14.2500 -170.5700 47.00 42.00 5.00 123077 SMO 1990 12 28 01 50 00 2094-66 P co CCGG 79.940 -999.990 ... R4 1991 01 14 15 08 00 -14.2500 -170.5700 47.00 42.00 5.00 123077 SMO 1990 12 29 12 34 56 2224-66 P co CCGG 76.480 -999.990 ... R4 1991 01 11 14 41 00 -14.2500 -170.5700 47.00 42.00 5.00 123080 SMO 1990 12 29 12 34 56 2224-66 P co CCGG 75.790 -999.990 ... R4 1991 01 11 14 59 00 -14.2500 -170.5700 47.00 42.00 5.00 123080 SMO 1990 12 31 23 15 00 2042-66 P co CCGG 73.420 -999.990 ... R4 1991 01 11 14 06 00 -14.2500 -170.5700 47.00 42.00 5.00 123082 SMO 1990 12 31 23 15 00 2042-66 P co CCGG 71.510 -999.990 ... R4 1991 01 11 14 24 00 -14.2500 -170.5700 47.00 42.00 5.00 123082 SMO 1991 01 04 22 40 00 2146-66 S co CCGG 66.400 -999.990 S.. R4 1991 01 14 13 25 00 -14.2500 -170.5700 60.30 42.00 18.30 123084 SMO 1991 01 04 22 40 00 2146-66 S co CCGG 66.990 -999.990 S.. R4 1991 01 14 13 41 00 -14.2500 -170.5700 60.30 42.00 18.30 123084 SMO 1991 01 04 23 20 00 2134-66 P co CCGG 70.590 -999.990 ... R4 1991 01 14 12 52 00 -14.2500 -170.5700 47.00 42.00 5.00 123086 SMO 1991 01 04 23 20 00 2134-66 P co CCGG 71.010 -999.990 ... R4 1991 01 14 13 09 00 -14.2500 -170.5700 47.00 42.00 5.00 123086 SMO 1991 01 11 21 43 00 2148-66 S co CCGG 63.580 -999.990 S.. R4 1991 01 25 12 09 00 -14.2500 -170.5700 60.30 42.00 18.30 123090 SMO 1991 01 11 21 43 00 2148-66 S co CCGG 62.530 -999.990 S.. R4 1991 01 25 12 25 00 -14.2500 -170.5700 60.30 42.00 18.30 123090 SMO 1991 01 11 22 40 00 2020-66 P co CCGG 72.640 -999.990 ... R4 1991 01 25 12 42 00 -14.2500 -170.5700 47.00 42.00 5.00 123092 SMO 1991 01 11 22 40 00 2020-66 P co CCGG 74.210 -999.990 ... R4 1991 01 25 13 00 00 -14.2500 -170.5700 47.00 42.00 5.00 123092 SMO 1991 01 11 22 40 00 3033-66 T co CCGG 69.250 -999.990 P.. R4 1991 02 04 10 05 00 -14.2500 -170.5700 44.00 42.00 2.00 123093 SMO 1991 01 11 22 40 00 3033-66 T co CCGG 70.200 -999.990 P.. R4 1991 02 04 10 23 00 -14.2500 -170.5700 44.00 42.00 2.00 123093 SMO 1991 01 11 22 40 00 3034-66 T co CCGG -999.990 -999.990 *.. R4 1991 02 04 12 06 00 -14.2500 -170.5700 44.00 42.00 2.00 123094 SMO 1991 01 11 22 40 00 3034-66 T co CCGG 64.430 -999.990 P.. R4 1991 02 04 12 25 00 -14.2500 -170.5700 44.00 42.00 2.00 123094 SMO 1991 01 17 01 40 00 2170-66 P co CCGG 81.480 -999.990 .N. R4 1991 04 02 09 43 00 -14.2500 -170.5700 47.00 42.00 5.00 123096 SMO 1991 01 17 01 40 00 2170-66 P co CCGG 81.800 -999.990 .N. R4 1991 04 02 10 01 00 -14.2500 -170.5700 47.00 42.00 5.00 123096 SMO 1991 01 18 00 45 00 2172-66 S co CCGG 68.350 -999.990 S.. R4 1991 01 31 16 51 00 -14.2500 -170.5700 60.30 42.00 18.30 123098 SMO 1991 01 18 00 45 00 2172-66 S co CCGG 68.000 -999.990 S.. R4 1991 01 31 17 07 00 -14.2500 -170.5700 60.30 42.00 18.30 123098 SMO 1991 01 18 01 20 00 2044-66 P co CCGG 68.690 -999.990 ... R4 1991 02 01 10 41 00 -14.2500 -170.5700 47.00 42.00 5.00 123100 SMO 1991 01 18 01 20 00 2044-66 P co CCGG 69.960 -999.990 ... R4 1991 02 01 10 59 00 -14.2500 -170.5700 47.00 42.00 5.00 123100 SMO 1991 01 18 01 20 00 3075-66 T co CCGG 67.700 -999.990 ... R4 1991 02 04 11 30 00 -14.2500 -170.5700 44.00 42.00 2.00 123101 SMO 1991 01 18 01 20 00 3075-66 T co CCGG 70.030 -999.990 ... R4 1991 02 04 11 49 00 -14.2500 -170.5700 44.00 42.00 2.00 123101 SMO 1991 01 18 01 20 00 3076-66 T co CCGG 71.330 -999.990 ... R4 1991 02 04 10 41 00 -14.2500 -170.5700 44.00 42.00 2.00 123102 SMO 1991 01 18 01 20 00 3076-66 T co CCGG 70.490 -999.990 ... R4 1991 02 04 11 00 00 -14.2500 -170.5700 44.00 42.00 2.00 123102 SMO 1991 01 26 01 20 00 2098-66 S co CCGG -999.990 -999.990 *.. R4 1991 02 11 09 16 00 -14.2500 -170.5700 60.30 42.00 18.30 123104 SMO 1991 01 26 01 20 00 2098-66 S co CCGG 55.500 -999.990 S.. R4 1991 02 11 09 32 00 -14.2500 -170.5700 60.30 42.00 18.30 123104 SMO 1991 01 26 02 10 00 2198-66 P co CCGG 63.280 -999.990 ... R4 1991 02 07 13 32 00 -14.2500 -170.5700 47.00 42.00 5.00 123106 SMO 1991 01 26 02 10 00 2198-66 P co CCGG 62.500 -999.990 ... R4 1991 02 07 13 50 00 -14.2500 -170.5700 47.00 42.00 5.00 123106 SMO 1991 01 26 02 10 00 3009-66 T co CCGG -999.990 -999.990 *.. R4 1991 02 13 19 34 00 -14.2500 -170.5700 44.00 42.00 2.00 123107 SMO 1991 01 26 02 10 00 3009-66 T co CCGG 61.090 -999.990 ... R4 1991 02 13 19 52 00 -14.2500 -170.5700 44.00 42.00 2.00 123107 SMO 1991 01 26 02 10 00 3009-66 T co CCGG 60.120 -999.990 ... R4 1991 02 13 20 11 00 -14.2500 -170.5700 44.00 42.00 2.00 123107 SMO 1991 01 26 02 10 00 3010-66 T co CCGG 61.710 -999.990 ... R4 1991 02 13 18 59 00 -14.2500 -170.5700 44.00 42.00 2.00 123108 SMO 1991 01 26 02 10 00 3010-66 T co CCGG -999.990 -999.990 *.. R4 1991 02 13 19 17 00 -14.2500 -170.5700 44.00 42.00 2.00 123108 SMO 1991 02 01 01 07 00 2032-66 S co CCGG 66.410 -999.990 S.> R4 1991 02 14 08 54 00 -14.2500 -170.5700 60.30 42.00 18.30 123110 SMO 1991 02 01 01 07 00 2032-66 S co CCGG 65.840 -999.990 S.. R4 1991 02 14 09 10 00 -14.2500 -170.5700 60.30 42.00 18.30 123110 SMO 1991 02 01 01 30 00 2218-66 P co CCGG 71.600 -999.990 ... R4 1991 02 14 09 27 00 -14.2500 -170.5700 47.00 42.00 5.00 123112 SMO 1991 02 01 01 30 00 2218-66 P co CCGG -999.990 -999.990 *.. R4 1991 02 14 09 45 00 -14.2500 -170.5700 47.00 42.00 5.00 123112 SMO 1991 02 01 01 30 00 3107-66 T co CCGG -999.990 -999.990 *.. R4 1991 02 13 18 23 00 -14.2500 -170.5700 44.00 42.00 2.00 123113 SMO 1991 02 01 01 30 00 3107-66 T co CCGG 66.420 -999.990 ... R4 1991 02 13 18 42 00 -14.2500 -170.5700 44.00 42.00 2.00 123113 SMO 1991 02 01 01 30 00 3108-66 T co CCGG 66.250 -999.990 ... R4 1991 02 13 17 47 00 -14.2500 -170.5700 44.00 42.00 2.00 123114 SMO 1991 02 01 01 30 00 3108-66 T co CCGG -999.990 -999.990 *.. R4 1991 02 13 18 06 00 -14.2500 -170.5700 44.00 42.00 2.00 123114 SMO 1991 02 12 00 35 00 2010-66 P co CCGG 65.280 -999.990 ... R4 1991 02 26 16 46 00 -14.2500 -170.5700 47.00 42.00 5.00 123116 SMO 1991 02 12 00 35 00 2010-66 P co CCGG 66.290 -999.990 ... R4 1991 02 26 17 04 00 -14.2500 -170.5700 47.00 42.00 5.00 123116 SMO 1991 02 12 00 35 00 3117-66 T co CCGG 66.340 -999.990 P.. R4 1991 03 11 08 54 00 -14.2500 -170.5700 44.00 42.00 2.00 123117 SMO 1991 02 12 00 35 00 3117-66 T co CCGG 64.030 -999.990 P.. R4 1991 03 11 09 12 00 -14.2500 -170.5700 44.00 42.00 2.00 123117 SMO 1991 02 12 00 35 00 3118-66 T co CCGG 80.650 -999.990 P.. R4 1991 03 11 09 30 00 -14.2500 -170.5700 44.00 42.00 2.00 123118 SMO 1991 02 12 00 35 00 3118-66 T co CCGG 82.630 -999.990 P.. R4 1991 03 11 09 48 00 -14.2500 -170.5700 44.00 42.00 2.00 123118 SMO 1991 02 12 02 05 00 2012-66 S co CCGG 66.440 -999.990 S.. R4 1991 02 26 17 20 00 -14.2500 -170.5700 60.30 42.00 18.30 123120 SMO 1991 02 12 02 05 00 2012-66 S co CCGG 65.730 -999.990 S.. R4 1991 02 26 17 36 00 -14.2500 -170.5700 60.30 42.00 18.30 123120 SMO 1991 02 19 01 45 00 2168-66 S co CCGG 74.810 -999.990 S.. R4 1991 03 11 12 17 00 -14.2500 -170.5700 60.30 42.00 18.30 123122 SMO 1991 02 19 01 45 00 2168-66 S co CCGG 74.510 -999.990 S.. R4 1991 03 11 12 33 00 -14.2500 -170.5700 60.30 42.00 18.30 123122 SMO 1991 02 19 02 40 00 2016-66 P co CCGG 78.760 -999.990 ... R4 1991 03 11 12 50 00 -14.2500 -170.5700 47.00 42.00 5.00 123124 SMO 1991 02 19 02 40 00 2016-66 P co CCGG 78.550 -999.990 ... R4 1991 03 11 13 07 00 -14.2500 -170.5700 47.00 42.00 5.00 123124 SMO 1991 02 19 02 40 00 3125-66 T co CCGG 70.030 -999.990 ... R4 1991 03 08 14 37 00 -14.2500 -170.5700 44.00 42.00 2.00 123125 SMO 1991 02 19 02 40 00 3125-66 T co CCGG 73.340 -999.990 ... R4 1991 03 08 14 55 00 -14.2500 -170.5700 44.00 42.00 2.00 123125 SMO 1991 02 19 02 40 00 3126-66 T co CCGG 73.460 -999.990 ... R4 1991 03 08 15 13 00 -14.2500 -170.5700 44.00 42.00 2.00 123126 SMO 1991 02 19 02 40 00 3126-66 T co CCGG 73.900 -999.990 ... R4 1991 03 08 15 31 00 -14.2500 -170.5700 44.00 42.00 2.00 123126 SMO 1991 02 28 00 25 00 2208-66 S co CCGG 86.040 -999.990 S.. R4 1991 04 02 11 04 00 -14.2500 -170.5700 60.30 42.00 18.30 123128 SMO 1991 02 28 00 25 00 2208-66 S co CCGG 85.280 -999.990 S.. R4 1991 04 02 11 20 00 -14.2500 -170.5700 60.30 42.00 18.30 123128 SMO 1991 02 28 01 20 00 2058-66 P co CCGG 86.330 -999.990 .X. R4 1991 04 02 11 37 00 -14.2500 -170.5700 47.00 42.00 5.00 123130 SMO 1991 02 28 01 20 00 2058-66 P co CCGG 87.560 -999.990 .X. R4 1991 04 02 11 54 00 -14.2500 -170.5700 47.00 42.00 5.00 123130 SMO 1991 02 28 01 20 00 3007-66 T co CCGG 84.640 -999.990 .X. R4 1991 03 13 19 26 00 -14.2500 -170.5700 44.00 42.00 2.00 123131 SMO 1991 02 28 01 20 00 3007-66 T co CCGG 85.330 -999.990 .X. R4 1991 03 13 19 43 00 -14.2500 -170.5700 44.00 42.00 2.00 123131 SMO 1991 02 28 01 20 00 3007-66 T co CCGG 84.370 -999.990 .X. R4 1991 03 13 20 01 00 -14.2500 -170.5700 44.00 42.00 2.00 123131 SMO 1991 02 28 01 20 00 3008-66 T co CCGG 84.830 -999.990 .X. R4 1991 03 14 09 19 00 -14.2500 -170.5700 44.00 42.00 2.00 123132 SMO 1991 02 28 01 20 00 3008-66 T co CCGG 84.810 -999.990 .X. R4 1991 03 14 09 36 00 -14.2500 -170.5700 44.00 42.00 2.00 123132 SMO 1991 02 28 01 20 00 3008-66 T co CCGG 85.920 -999.990 .X. R4 1991 03 14 09 54 00 -14.2500 -170.5700 44.00 42.00 2.00 123132 SMO 1991 03 02 02 15 00 2152-66 P co CCGG 83.250 -999.990 .X. R4 1991 04 02 10 18 00 -14.2500 -170.5700 47.00 42.00 5.00 123134 SMO 1991 03 02 02 15 00 2152-66 P co CCGG 83.300 -999.990 .X. R4 1991 04 02 10 35 00 -14.2500 -170.5700 47.00 42.00 5.00 123134 SMO 1991 03 05 00 30 00 2047-66 S co CCGG 74.070 -999.990 S.. R4 1991 03 27 09 47 00 -14.2500 -170.5700 60.30 42.00 18.30 123135 SMO 1991 03 05 00 30 00 2047-66 S co CCGG 72.770 -999.990 S.. R4 1991 03 27 10 03 00 -14.2500 -170.5700 60.30 42.00 18.30 123135 SMO 1991 03 05 01 00 00 2229-66 P co CCGG 79.650 -999.990 P.. R4 1991 03 25 15 58 00 -14.2500 -170.5700 47.00 42.00 5.00 123137 SMO 1991 03 05 01 00 00 2229-66 P co CCGG 81.250 -999.990 P.. R4 1991 03 25 16 16 00 -14.2500 -170.5700 47.00 42.00 5.00 123137 SMO 1991 03 05 01 00 00 2230-66 P co CCGG 83.820 -999.990 P.. R4 1991 03 25 12 58 00 -14.2500 -170.5700 47.00 42.00 5.00 123138 SMO 1991 03 05 01 00 00 2230-66 P co CCGG 83.980 -999.990 P.. R4 1991 03 25 13 16 00 -14.2500 -170.5700 47.00 42.00 5.00 123138 SMO 1991 03 05 01 00 00 3031-66 T co CCGG 77.260 -999.990 ... R4 1991 03 13 21 45 00 -14.2500 -170.5700 44.00 42.00 2.00 123139 SMO 1991 03 05 01 00 00 3031-66 T co CCGG 76.090 -999.990 ... R4 1991 03 13 22 03 00 -14.2500 -170.5700 44.00 42.00 2.00 123139 SMO 1991 03 05 01 00 00 3032-66 T co CCGG 74.070 -999.990 ... R4 1991 03 13 18 18 00 -14.2500 -170.5700 44.00 42.00 2.00 123140 SMO 1991 03 05 01 00 00 3032-66 T co CCGG -999.990 -999.990 *.. R4 1991 03 13 18 36 00 -14.2500 -170.5700 44.00 42.00 2.00 123140 SMO 1991 03 14 00 45 00 2036-66 P co CCGG -999.990 -999.990 *.. R4 1991 03 21 11 25 00 -14.2500 -170.5700 47.00 42.00 5.00 123142 SMO 1991 03 14 00 45 00 2036-66 P co CCGG 62.690 -999.990 ... R4 1991 03 21 11 42 00 -14.2500 -170.5700 47.00 42.00 5.00 123142 SMO 1991 03 14 00 50 00 3091-66 T co CCGG 65.000 -999.990 ... R4 1991 04 01 09 14 00 -14.2500 -170.5700 44.00 42.00 2.00 123143 SMO 1991 03 14 00 50 00 3091-66 T co CCGG -999.990 -999.990 *.. R4 1991 04 01 09 32 00 -14.2500 -170.5700 44.00 42.00 2.00 123143 SMO 1991 03 14 00 50 00 3092-66 T co CCGG 62.600 -999.990 ... R4 1991 04 01 11 44 00 -14.2500 -170.5700 44.00 42.00 2.00 123144 SMO 1991 03 14 00 50 00 3092-66 T co CCGG 64.540 -999.990 ... R4 1991 04 01 12 02 00 -14.2500 -170.5700 44.00 42.00 2.00 123144 SMO 1991 03 14 12 34 56 2066-66 S co CCGG 60.280 -999.990 S.. R4 1991 03 21 11 59 00 -14.2500 -170.5700 60.30 42.00 18.30 123146 SMO 1991 03 14 12 34 56 2066-66 S co CCGG 61.460 -999.990 S.. R4 1991 03 21 12 16 00 -14.2500 -170.5700 60.30 42.00 18.30 123146 SMO 1991 03 20 23 20 00 2108-66 S co CCGG 61.570 -999.990 S.. R4 1991 04 01 15 05 00 -14.2500 -170.5700 60.30 42.00 18.30 123148 SMO 1991 03 20 23 20 00 2108-66 S co CCGG -999.990 -999.990 *.. R4 1991 04 01 15 21 00 -14.2500 -170.5700 60.30 42.00 18.30 123148 SMO 1991 03 20 23 47 00 2226-66 P co CCGG 88.070 -999.990 .X. R4 1991 04 01 14 32 00 -14.2500 -170.5700 47.00 42.00 5.00 123150 SMO 1991 03 20 23 47 00 2226-66 P co CCGG 90.160 -999.990 .X. R4 1991 04 01 14 49 00 -14.2500 -170.5700 47.00 42.00 5.00 123150 SMO 1991 03 20 23 47 00 3173-66 T co CCGG 61.660 -999.990 ... R4 1991 04 01 10 34 00 -14.2500 -170.5700 44.00 42.00 2.00 123151 SMO 1991 03 20 23 47 00 3173-66 T co CCGG 63.090 -999.990 ... R4 1991 04 01 10 52 00 -14.2500 -170.5700 44.00 42.00 2.00 123151 SMO 1991 03 20 23 47 00 3174-66 T co CCGG -999.990 -999.990 *.. R4 1991 04 01 11 09 00 -14.2500 -170.5700 44.00 42.00 2.00 123152 SMO 1991 03 20 23 47 00 3174-66 T co CCGG -999.990 -999.990 *.. R4 1991 04 01 11 27 00 -14.2500 -170.5700 44.00 42.00 2.00 123152 SMO 1991 03 26 00 45 00 2148-66 S co CCGG 62.940 -999.990 S.. R4 1991 04 11 11 29 00 -14.2500 -170.5700 60.30 42.00 18.30 123154 SMO 1991 03 26 00 45 00 2148-66 S co CCGG -999.990 -999.990 *.. R4 1991 04 11 11 45 00 -14.2500 -170.5700 60.30 42.00 18.30 123154 SMO 1991 03 26 01 50 00 2130-66 P co CCGG 69.360 -999.990 ... R4 1991 04 11 12 02 00 -14.2500 -170.5700 47.00 42.00 5.00 123156 SMO 1991 03 26 01 50 00 2130-66 P co CCGG 71.210 -999.990 ... R4 1991 04 11 12 19 00 -14.2500 -170.5700 47.00 42.00 5.00 123156 SMO 1991 03 26 01 50 00 3109-66 T co CCGG 66.140 -999.990 ... R4 1991 04 19 10 03 00 -14.2500 -170.5700 44.00 42.00 2.00 123157 SMO 1991 03 26 01 50 00 3109-66 T co CCGG 67.720 -999.990 ... R4 1991 04 19 10 21 00 -14.2500 -170.5700 44.00 42.00 2.00 123157 SMO 1991 03 26 01 50 00 3110-66 T co CCGG 69.480 -999.990 ... R4 1991 04 19 09 27 00 -14.2500 -170.5700 44.00 42.00 2.00 123158 SMO 1991 03 26 01 50 00 3110-66 T co CCGG 69.740 -999.990 ... R4 1991 04 19 09 45 00 -14.2500 -170.5700 44.00 42.00 2.00 123158 SMO 1991 04 03 23 04 00 2240-66 S co CCGG 55.960 -999.990 S.. R4 1991 04 12 09 57 00 -14.2500 -170.5700 60.30 42.00 18.30 123160 SMO 1991 04 03 23 04 00 2240-66 S co CCGG 55.090 -999.990 S.. R4 1991 04 12 10 13 00 -14.2500 -170.5700 60.30 42.00 18.30 123160 SMO 1991 04 04 01 45 00 2060-66 P co CCGG -999.990 -999.990 *.. R4 1991 04 12 09 23 00 -14.2500 -170.5700 47.00 42.00 5.00 123162 SMO 1991 04 04 01 45 00 2060-66 P co CCGG 60.920 -999.990 ... R4 1991 04 12 09 41 00 -14.2500 -170.5700 47.00 42.00 5.00 123162 SMO 1991 04 04 01 45 00 3005-66 T co CCGG 60.680 -999.990 ... R4 1991 04 17 15 11 00 -14.2500 -170.5700 44.00 42.00 2.00 123163 SMO 1991 04 04 01 45 00 3005-66 T co CCGG 62.270 -999.990 ... R4 1991 04 17 15 29 00 -14.2500 -170.5700 44.00 42.00 2.00 123163 SMO 1991 04 04 01 45 00 3006-66 T co CCGG 58.110 -999.990 ... R4 1991 04 19 08 51 00 -14.2500 -170.5700 44.00 42.00 2.00 123164 SMO 1991 04 04 01 45 00 3006-66 T co CCGG -999.990 -999.990 *.. R4 1991 04 19 09 10 00 -14.2500 -170.5700 44.00 42.00 2.00 123164 SMO 1991 04 09 01 30 00 2116-66 S co CCGG -999.990 -999.990 *.. R4 1991 04 17 14 03 00 -14.2500 -170.5700 60.30 42.00 18.30 123166 SMO 1991 04 09 01 30 00 2116-66 S co CCGG -999.990 -999.990 *.. R4 1991 04 17 14 19 00 -14.2500 -170.5700 60.30 42.00 18.30 123166 SMO 1991 04 09 02 00 00 2134-66 P co CCGG 57.590 -999.990 ... R4 1991 04 17 14 35 00 -14.2500 -170.5700 47.00 42.00 5.00 123168 SMO 1991 04 09 02 00 00 2134-66 P co CCGG 56.830 -999.990 ... R4 1991 04 17 14 53 00 -14.2500 -170.5700 47.00 42.00 5.00 123168 SMO 1991 04 09 02 00 00 3039-66 T co CCGG 58.640 -999.990 ... R4 1991 05 07 12 12 00 -14.2500 -170.5700 44.00 42.00 2.00 123169 SMO 1991 04 09 02 00 00 3039-66 T co CCGG 56.060 -999.990 ... R4 1991 05 07 12 30 00 -14.2500 -170.5700 44.00 42.00 2.00 123169 SMO 1991 04 09 02 00 00 3040-66 T co CCGG -999.990 -999.990 *.. R4 1991 05 07 11 29 00 -14.2500 -170.5700 44.00 42.00 2.00 123170 SMO 1991 04 09 02 00 00 3040-66 T co CCGG 55.890 -999.990 ... R4 1991 05 07 11 46 00 -14.2500 -170.5700 44.00 42.00 2.00 123170 SMO 1991 04 16 01 30 00 2276-66 P co CCGG 70.280 -999.990 ... R4 1991 04 29 09 55 00 -14.2500 -170.5700 47.00 42.00 5.00 123172 SMO 1991 04 16 01 30 00 2276-66 P co CCGG 71.080 -999.990 ... R4 1991 04 29 10 13 00 -14.2500 -170.5700 47.00 42.00 5.00 123172 SMO 1991 04 16 01 30 00 3105-66 T co CCGG 61.510 -999.990 ... R4 1991 05 07 10 53 00 -14.2500 -170.5700 44.00 42.00 2.00 123173 SMO 1991 04 16 01 30 00 3105-66 T co CCGG -999.990 -999.990 *.. R4 1991 05 07 11 11 00 -14.2500 -170.5700 44.00 42.00 2.00 123173 SMO 1991 04 16 01 30 00 3106-66 T co CCGG 59.930 -999.990 ... R4 1991 05 07 09 43 00 -14.2500 -170.5700 44.00 42.00 2.00 123174 SMO 1991 04 16 01 30 00 3106-66 T co CCGG 58.300 -999.990 ... R4 1991 05 07 10 01 00 -14.2500 -170.5700 44.00 42.00 2.00 123174 SMO 1991 04 16 02 15 00 2272-66 S co CCGG -999.990 -999.990 *.. R4 1991 04 29 10 29 00 -14.2500 -170.5700 60.30 42.00 18.30 123176 SMO 1991 04 16 02 15 00 2272-66 S co CCGG 56.310 -999.990 S.. R4 1991 04 29 10 45 00 -14.2500 -170.5700 60.30 42.00 18.30 123176 SMO 1991 04 24 01 30 00 2194-66 S co CCGG 68.950 -999.990 S.. R4 1991 05 03 13 53 00 -14.2500 -170.5700 60.30 42.00 18.30 123178 SMO 1991 04 24 01 30 00 2194-66 S co CCGG -999.990 -999.990 *.. R4 1991 05 03 14 09 00 -14.2500 -170.5700 60.30 42.00 18.30 123178 SMO 1991 04 24 02 10 00 2218-66 P co CCGG 71.480 -999.990 ... R4 1991 05 03 13 19 00 -14.2500 -170.5700 47.00 42.00 5.00 123180 SMO 1991 04 24 02 10 00 2218-66 P co CCGG 73.330 -999.990 ... R4 1991 05 03 13 36 00 -14.2500 -170.5700 47.00 42.00 5.00 123180 SMO 1991 04 24 02 10 00 3003-66 T co CCGG 71.950 -999.990 ... R4 1991 05 10 13 46 00 -14.2500 -170.5700 44.00 42.00 2.00 123181 SMO 1991 04 24 02 10 00 3003-66 T co CCGG 71.870 -999.990 ... R4 1991 05 10 14 03 00 -14.2500 -170.5700 44.00 42.00 2.00 123181 SMO 1991 04 24 02 10 00 3004-66 T co CCGG 74.710 -999.990 ... R4 1991 05 10 14 21 00 -14.2500 -170.5700 44.00 42.00 2.00 123182 SMO 1991 04 24 02 10 00 3004-66 T co CCGG 75.180 -999.990 ... R4 1991 05 10 14 39 00 -14.2500 -170.5700 44.00 42.00 2.00 123182 SMO 1991 04 30 02 20 00 2268-66 S co CCGG 68.270 -999.990 S.. R4 1991 05 08 13 57 00 -14.2500 -170.5700 60.30 42.00 18.30 123184 SMO 1991 04 30 02 20 00 2268-66 S co CCGG 66.790 -999.990 S.. R4 1991 05 08 14 13 00 -14.2500 -170.5700 60.30 42.00 18.30 123184 SMO 1991 04 30 02 52 00 2278-66 P co CCGG 70.660 -999.990 ... R4 1991 05 08 13 23 00 -14.2500 -170.5700 47.00 42.00 5.00 123186 SMO 1991 04 30 02 52 00 2278-66 P co CCGG 70.800 -999.990 ... R4 1991 05 08 13 41 00 -14.2500 -170.5700 47.00 42.00 5.00 123186 SMO 1991 04 30 02 52 00 3045-66 T co CCGG 69.450 -999.990 ... R4 1991 05 13 10 27 00 -14.2500 -170.5700 44.00 42.00 2.00 123187 SMO 1991 04 30 02 52 00 3045-66 T co CCGG 70.020 -999.990 ... R4 1991 05 13 10 44 00 -14.2500 -170.5700 44.00 42.00 2.00 123187 SMO 1991 04 30 02 52 00 3046-66 T co CCGG 70.790 -999.990 ... R4 1991 05 13 09 51 00 -14.2500 -170.5700 44.00 42.00 2.00 123188 SMO 1991 04 30 02 52 00 3046-66 T co CCGG 69.290 -999.990 ... R4 1991 05 13 10 09 00 -14.2500 -170.5700 44.00 42.00 2.00 123188 SMO 1991 05 09 01 25 00 2120-66 P co CCGG 70.520 -999.990 ... R4 1991 05 20 15 21 00 -14.2500 -170.5700 47.00 42.00 5.00 123190 SMO 1991 05 09 01 25 00 2120-66 P co CCGG 70.840 -999.990 ... R4 1991 05 20 15 38 00 -14.2500 -170.5700 47.00 42.00 5.00 123190 SMO 1991 05 09 01 25 00 3029-66 T co CCGG 65.940 -999.990 ... R4 1991 05 29 09 30 00 -14.2500 -170.5700 44.00 42.00 2.00 123191 SMO 1991 05 09 01 25 00 3029-66 T co CCGG 66.780 -999.990 ... R4 1991 05 29 09 48 00 -14.2500 -170.5700 44.00 42.00 2.00 123191 SMO 1991 05 09 01 25 00 3030-66 T co CCGG 66.260 -999.990 ... R4 1991 05 29 10 06 00 -14.2500 -170.5700 44.00 42.00 2.00 123192 SMO 1991 05 09 01 25 00 3030-66 T co CCGG 65.830 -999.990 ... R4 1991 05 29 10 23 00 -14.2500 -170.5700 44.00 42.00 2.00 123192 SMO 1991 05 09 02 10 00 2260-66 S co CCGG 67.860 -999.990 S.. R4 1991 05 22 11 43 00 -14.2500 -170.5700 60.30 42.00 18.30 123194 SMO 1991 05 09 02 10 00 2260-66 S co CCGG 66.670 -999.990 S.. R4 1991 05 22 11 59 00 -14.2500 -170.5700 60.30 42.00 18.30 123194 SMO 1991 05 13 22 20 00 2262-66 S co CCGG 58.750 -999.990 S.. R4 1991 06 07 13 55 00 -14.2500 -170.5700 60.30 42.00 18.30 123196 SMO 1991 05 13 22 20 00 2262-66 S co CCGG -999.990 -999.990 *.. R4 1991 06 07 14 11 00 -14.2500 -170.5700 60.30 42.00 18.30 123196 SMO 1991 05 13 23 00 00 2178-66 P co CCGG 65.240 -999.990 ... R4 1991 06 07 14 28 00 -14.2500 -170.5700 47.00 42.00 5.00 123198 SMO 1991 05 13 23 00 00 2178-66 P co CCGG 64.430 -999.990 ... R4 1991 06 07 14 45 00 -14.2500 -170.5700 47.00 42.00 5.00 123198 SMO 1991 05 13 23 00 00 3097-66 T co CCGG -999.990 -999.990 *.. R4 1991 05 28 20 07 00 -14.2500 -170.5700 44.00 42.00 2.00 123199 SMO 1991 05 13 23 00 00 3097-66 T co CCGG -999.990 -999.990 *.. R4 1991 05 28 20 25 00 -14.2500 -170.5700 44.00 42.00 2.00 123199 SMO 1991 05 13 23 00 00 3098-66 T co CCGG 64.130 -999.990 ... R4 1991 05 29 08 55 00 -14.2500 -170.5700 44.00 42.00 2.00 123200 SMO 1991 05 13 23 00 00 3098-66 T co CCGG -999.990 -999.990 *.. R4 1991 05 29 09 13 00 -14.2500 -170.5700 44.00 42.00 2.00 123200 SMO 1991 05 23 00 15 00 2003-66 S co CCGG 60.530 -999.990 S.. R4 1991 06 04 12 18 00 -14.2500 -170.5700 60.30 42.00 18.30 123201 SMO 1991 05 23 00 15 00 2003-66 S co CCGG 59.530 -999.990 S.. R4 1991 06 04 12 34 00 -14.2500 -170.5700 60.30 42.00 18.30 123201 SMO 1991 05 23 00 15 00 2004-66 S co CCGG 61.500 -999.990 S.. R4 1991 06 03 14 20 00 -14.2500 -170.5700 60.30 42.00 18.30 123202 SMO 1991 05 23 00 45 00 2040-66 P co CCGG -999.990 -999.990 *.. R4 1991 06 03 13 45 00 -14.2500 -170.5700 47.00 42.00 5.00 123204 SMO 1991 05 23 00 45 00 2040-66 P co CCGG 63.920 -999.990 ... R4 1991 06 03 14 02 00 -14.2500 -170.5700 47.00 42.00 5.00 123204 SMO 1991 05 23 00 45 00 3041-66 T co CCGG 58.240 -999.990 ... R4 1991 06 11 11 34 00 -14.2500 -170.5700 44.00 42.00 2.00 123205 SMO 1991 05 23 00 45 00 3041-66 T co CCGG 57.250 -999.990 ... R4 1991 06 11 11 51 00 -14.2500 -170.5700 44.00 42.00 2.00 123205 SMO 1991 05 23 00 45 00 3042-66 T co CCGG 59.160 -999.990 Z.. R4 1991 06 11 09 27 00 -14.2500 -170.5700 44.00 42.00 2.00 123206 SMO 1991 05 23 00 45 00 3042-66 T co CCGG 64.020 -999.990 Z.. R4 1991 06 11 09 44 00 -14.2500 -170.5700 44.00 42.00 2.00 123206 SMO 1991 05 28 22 43 00 2106-66 S co CCGG 62.070 -999.990 S.. R4 1991 06 10 13 39 00 -14.2500 -170.5700 60.30 42.00 18.30 123208 SMO 1991 05 28 22 43 00 2106-66 S co CCGG -999.990 -999.990 *.. R4 1991 06 10 13 55 00 -14.2500 -170.5700 60.30 42.00 18.30 123208 SMO 1991 05 28 23 15 00 2156-66 P co CCGG 69.050 -999.990 ... R4 1991 06 10 15 17 00 -14.2500 -170.5700 47.00 42.00 5.00 123210 SMO 1991 05 28 23 15 00 3093-66 T co CCGG 65.090 -999.990 ... R4 1991 06 11 10 36 00 -14.2500 -170.5700 44.00 42.00 2.00 123211 SMO 1991 05 28 23 15 00 3093-66 T co CCGG 65.380 -999.990 ... R4 1991 06 11 10 54 00 -14.2500 -170.5700 44.00 42.00 2.00 123211 SMO 1991 05 28 23 15 00 3094-66 T co CCGG 63.920 -999.990 ... R4 1991 06 11 10 01 00 -14.2500 -170.5700 44.00 42.00 2.00 123212 SMO 1991 05 28 23 15 00 3094-66 T co CCGG -999.990 -999.990 *.. R4 1991 06 11 10 19 00 -14.2500 -170.5700 44.00 42.00 2.00 123212 SMO 1991 06 04 22 48 00 2070-66 S co CCGG 58.660 -999.990 S.. R4 1991 06 12 11 45 00 -14.2500 -170.5700 60.30 42.00 18.30 123214 SMO 1991 06 04 22 48 00 2070-66 S co CCGG 58.560 -999.990 S.. R4 1991 06 12 12 01 00 -14.2500 -170.5700 60.30 42.00 18.30 123214 SMO 1991 06 04 23 20 00 2098-66 P co CCGG 64.270 -999.990 ... R4 1991 06 12 14 05 00 -14.2500 -170.5700 47.00 42.00 5.00 123216 SMO 1991 06 04 23 20 00 2098-66 P co CCGG 66.340 -999.990 ... R4 1991 06 12 14 23 00 -14.2500 -170.5700 47.00 42.00 5.00 123216 SMO 1991 06 04 23 20 00 3307-66 T co CCGG 56.920 -999.990 ... R4 1991 06 24 10 03 00 -14.2500 -170.5700 44.00 42.00 2.00 123217 SMO 1991 06 04 23 20 00 3307-66 T co CCGG 57.280 -999.990 ... R4 1991 06 24 10 20 00 -14.2500 -170.5700 44.00 42.00 2.00 123217 SMO 1991 06 04 23 20 00 3308-66 T co CCGG 57.370 -999.990 ... R4 1991 06 24 12 23 00 -14.2500 -170.5700 44.00 42.00 2.00 123218 SMO 1991 06 04 23 20 00 3308-66 T co CCGG 56.960 -999.990 ... R4 1991 06 24 12 40 00 -14.2500 -170.5700 44.00 42.00 2.00 123218 SMO 1991 06 12 01 20 00 2036-66 S co CCGG 60.650 -999.990 S.. R4 1991 06 28 10 44 00 -14.2500 -170.5700 60.30 42.00 18.30 123220 SMO 1991 06 12 01 20 00 2036-66 S co CCGG 60.520 -999.990 S.. R4 1991 06 28 11 00 00 -14.2500 -170.5700 60.30 42.00 18.30 123220 SMO 1991 06 12 01 55 00 2088-66 P co CCGG 64.760 -999.990 ... R4 1991 06 28 11 25 00 -14.2500 -170.5700 47.00 42.00 5.00 123222 SMO 1991 06 12 01 55 00 2088-66 P co CCGG 64.490 -999.990 ... R4 1991 06 28 11 43 00 -14.2500 -170.5700 47.00 42.00 5.00 123222 SMO 1991 06 12 01 55 00 3309-66 T co CCGG 61.620 -999.990 ... R4 1991 06 24 11 13 00 -14.2500 -170.5700 44.00 42.00 2.00 123223 SMO 1991 06 12 01 55 00 3309-66 T co CCGG 60.680 -999.990 ... R4 1991 06 24 11 30 00 -14.2500 -170.5700 44.00 42.00 2.00 123223 SMO 1991 06 12 01 55 00 3310-66 T co CCGG 61.030 -999.990 ... R4 1991 06 24 09 27 00 -14.2500 -170.5700 44.00 42.00 2.00 123224 SMO 1991 06 12 01 55 00 3310-66 T co CCGG 61.150 -999.990 ... R4 1991 06 24 09 45 00 -14.2500 -170.5700 44.00 42.00 2.00 123224 SMO 1991 06 19 01 10 00 2308-66 S co CCGG 57.430 -999.990 S.. R4 1991 07 01 10 30 00 -14.2500 -170.5700 60.30 42.00 18.30 123226 SMO 1991 06 19 01 10 00 2308-66 S co CCGG 57.390 -999.990 S.. R4 1991 07 01 10 47 00 -14.2500 -170.5700 60.30 42.00 18.30 123226 SMO 1991 06 19 02 38 00 2305-66 P co CCGG 63.120 -999.990 ... R4 1991 07 02 09 15 00 -14.2500 -170.5700 47.00 42.00 5.00 123227 SMO 1991 06 19 02 38 00 3071-66 T co CCGG 62.760 -999.990 ... R4 1991 07 08 20 43 00 -14.2500 -170.5700 44.00 42.00 2.00 123229 SMO 1991 06 19 02 38 00 3071-66 T co CCGG 63.620 -999.990 ... R4 1991 07 08 21 01 00 -14.2500 -170.5700 44.00 42.00 2.00 123229 SMO 1991 06 19 02 38 00 3072-66 T co CCGG 63.260 -999.990 ... R4 1991 07 11 11 45 00 -14.2500 -170.5700 44.00 42.00 2.00 123230 SMO 1991 06 19 02 38 00 3072-66 T co CCGG 63.140 -999.990 ... R4 1991 07 11 12 03 00 -14.2500 -170.5700 44.00 42.00 2.00 123230 SMO 1991 06 25 02 45 00 2032-66 P co CCGG 59.980 -999.990 ... R4 1991 07 02 14 43 00 -14.2500 -170.5700 47.00 42.00 5.00 123232 SMO 1991 06 25 02 45 00 2032-66 P co CCGG 61.080 -999.990 ... R4 1991 07 02 15 00 00 -14.2500 -170.5700 47.00 42.00 5.00 123232 SMO 1991 06 25 02 45 00 3031-66 T co CCGG 60.180 -999.990 ... R4 1991 07 08 16 45 00 -14.2500 -170.5700 44.00 42.00 2.00 123233 SMO 1991 06 25 02 45 00 3031-66 T co CCGG 59.760 -999.990 ... R4 1991 07 08 17 02 00 -14.2500 -170.5700 44.00 42.00 2.00 123233 SMO 1991 06 25 02 45 00 3032-66 T co CCGG 59.100 -999.990 ... R4 1991 07 08 19 32 00 -14.2500 -170.5700 44.00 42.00 2.00 123234 SMO 1991 06 25 02 45 00 3032-66 T co CCGG 59.740 -999.990 ... R4 1991 07 08 19 50 00 -14.2500 -170.5700 44.00 42.00 2.00 123234 SMO 1991 06 25 03 10 00 2134-66 S co CCGG 59.370 -999.990 S.. R4 1991 07 03 10 32 00 -14.2500 -170.5700 60.30 42.00 18.30 123236 SMO 1991 06 25 03 10 00 2134-66 S co CCGG 58.530 -999.990 S.. R4 1991 07 03 10 48 00 -14.2500 -170.5700 60.30 42.00 18.30 123236 SMO 1991 07 02 01 35 00 2162-66 S co CCGG 59.020 -999.990 S.. R4 1991 07 11 13 11 00 -14.2500 -170.5700 60.30 42.00 18.30 123238 SMO 1991 07 02 01 35 00 2162-66 S co CCGG 58.860 -999.990 S.. R4 1991 07 11 13 27 00 -14.2500 -170.5700 60.30 42.00 18.30 123238 SMO 1991 07 02 02 15 00 2220-66 P co CCGG 63.240 -999.990 ... R4 1991 07 11 18 22 00 -14.2500 -170.5700 47.00 42.00 5.00 123240 SMO 1991 07 02 02 15 00 2220-66 P co CCGG 63.470 -999.990 ... R4 1991 07 11 18 40 00 -14.2500 -170.5700 47.00 42.00 5.00 123240 SMO 1991 07 02 02 15 00 3053-66 T co CCGG 68.010 -999.990 ... R4 1991 07 24 09 02 00 -14.2500 -170.5700 44.00 42.00 2.00 123241 SMO 1991 07 02 02 15 00 3053-66 T co CCGG 67.770 -999.990 ... R4 1991 07 24 09 20 00 -14.2500 -170.5700 44.00 42.00 2.00 123241 SMO 1991 07 02 02 15 00 3054-66 T co CCGG 65.220 -999.990 ... R4 1991 07 23 18 59 00 -14.2500 -170.5700 44.00 42.00 2.00 123242 SMO 1991 07 02 02 15 00 3054-66 T co CCGG 65.040 -999.990 ... R4 1991 07 23 19 16 00 -14.2500 -170.5700 44.00 42.00 2.00 123242 SMO 1991 07 10 22 40 00 2182-66 S co CCGG 65.770 -999.990 S.. R4 1991 07 22 10 51 00 -14.2500 -170.5700 60.30 42.00 18.30 123244 SMO 1991 07 10 22 40 00 2182-66 S co CCGG -999.990 -999.990 *.. R4 1991 07 22 11 07 00 -14.2500 -170.5700 60.30 42.00 18.30 123244 SMO 1991 07 10 23 15 00 2190-66 P co CCGG 69.110 -999.990 ... R4 1991 07 22 10 17 00 -14.2500 -170.5700 47.00 42.00 5.00 123246 SMO 1991 07 10 23 15 00 2190-66 P co CCGG 70.550 -999.990 ... R4 1991 07 22 10 35 00 -14.2500 -170.5700 47.00 42.00 5.00 123246 SMO 1991 07 10 23 15 00 3077-66 T co CCGG 73.360 -999.990 ... R4 1991 07 24 10 14 00 -14.2500 -170.5700 44.00 42.00 2.00 123247 SMO 1991 07 10 23 15 00 3077-66 T co CCGG 72.270 -999.990 ... R4 1991 07 24 10 32 00 -14.2500 -170.5700 44.00 42.00 2.00 123247 SMO 1991 07 10 23 15 00 3078-66 T co CCGG 73.480 -999.990 ... R4 1991 07 23 18 24 00 -14.2500 -170.5700 44.00 42.00 2.00 123248 SMO 1991 07 10 23 15 00 3078-66 T co CCGG 72.650 -999.990 ... R4 1991 07 23 18 41 00 -14.2500 -170.5700 44.00 42.00 2.00 123248 SMO 1991 07 17 01 12 00 2204-66 S co CCGG 65.360 -999.990 S.. R4 1991 07 30 20 53 00 -14.2500 -170.5700 60.30 42.00 18.30 123250 SMO 1991 07 17 01 12 00 2204-66 S co CCGG 67.630 -999.990 S.. R4 1991 07 30 21 10 00 -14.2500 -170.5700 60.30 42.00 18.30 123250 SMO 1991 07 17 01 55 00 2272-66 P co CCGG 71.490 -999.990 ... R4 1991 07 30 18 09 00 -14.2500 -170.5700 47.00 42.00 5.00 123252 SMO 1991 07 17 01 55 00 2272-66 P co CCGG 71.870 -999.990 ... R4 1991 07 30 18 26 00 -14.2500 -170.5700 47.00 42.00 5.00 123252 SMO 1991 07 17 01 55 00 3167-66 T co CCGG 67.320 -999.990 ... R4 1991 08 01 12 11 00 -14.2500 -170.5700 44.00 42.00 2.00 123253 SMO 1991 07 17 01 55 00 3167-66 T co CCGG 68.380 -999.990 ... R4 1991 08 01 12 28 00 -14.2500 -170.5700 44.00 42.00 2.00 123253 SMO 1991 07 17 01 55 00 3168-66 T co CCGG 66.760 -999.990 ... R4 1991 08 01 12 45 00 -14.2500 -170.5700 44.00 42.00 2.00 123254 SMO 1991 07 17 01 55 00 3168-66 T co CCGG 67.260 -999.990 ... R4 1991 08 01 13 03 00 -14.2500 -170.5700 44.00 42.00 2.00 123254 SMO 1991 07 23 00 35 00 2132-66 S co CCGG 73.200 -999.990 S.. R4 1991 08 16 18 54 00 -14.2500 -170.5700 60.30 42.00 18.30 123256 SMO 1991 07 23 00 35 00 2132-66 S co CCGG 74.280 -999.990 S.. R4 1991 08 16 19 10 00 -14.2500 -170.5700 60.30 42.00 18.30 123256 SMO 1991 07 23 01 15 00 2186-66 P co CCGG 66.860 -999.990 ... R4 1991 08 16 19 27 00 -14.2500 -170.5700 47.00 42.00 5.00 123258 SMO 1991 07 23 01 15 00 2186-66 P co CCGG 67.300 -999.990 ... R4 1991 08 16 19 45 00 -14.2500 -170.5700 47.00 42.00 5.00 123258 SMO 1991 07 23 01 15 00 3017-66 T co CCGG 61.260 -999.990 ... R4 1991 08 01 11 36 00 -14.2500 -170.5700 44.00 42.00 2.00 123259 SMO 1991 07 23 01 15 00 3017-66 T co CCGG 61.610 -999.990 ... R4 1991 08 01 11 53 00 -14.2500 -170.5700 44.00 42.00 2.00 123259 SMO 1991 07 23 01 15 00 3018-66 T co CCGG 62.070 -999.990 ... R4 1991 08 01 10 26 00 -14.2500 -170.5700 44.00 42.00 2.00 123260 SMO 1991 07 23 01 15 00 3018-66 T co CCGG 62.130 -999.990 ... R4 1991 08 01 10 44 00 -14.2500 -170.5700 44.00 42.00 2.00 123260 SMO 1991 07 31 00 55 00 2062-66 P co CCGG 69.120 -999.990 ... R4 1991 08 12 20 21 00 -14.2500 -170.5700 47.00 42.00 5.00 123262 SMO 1991 07 31 00 55 00 2062-66 P co CCGG -999.990 -999.990 *.. R4 1991 08 12 20 38 00 -14.2500 -170.5700 47.00 42.00 5.00 123262 SMO 1991 07 31 00 55 00 3183-66 T co CCGG 67.610 -999.990 ... R4 1991 08 16 10 14 00 -14.2500 -170.5700 44.00 42.00 2.00 123263 SMO 1991 07 31 00 55 00 3183-66 T co CCGG 67.590 -999.990 ... R4 1991 08 16 10 32 00 -14.2500 -170.5700 44.00 42.00 2.00 123263 SMO 1991 07 31 00 55 00 3184-66 T co CCGG 68.120 -999.990 ... R4 1991 08 15 15 26 00 -14.2500 -170.5700 44.00 42.00 2.00 123264 SMO 1991 07 31 00 55 00 3184-66 T co CCGG 67.930 -999.990 ... R4 1991 08 15 15 43 00 -14.2500 -170.5700 44.00 42.00 2.00 123264 SMO 1991 07 31 12 34 56 2120-66 S co CCGG 65.330 -999.990 S.. R4 1991 08 12 20 54 00 -14.2500 -170.5700 60.30 42.00 18.30 123266 SMO 1991 07 31 12 34 56 2120-66 S co CCGG 64.760 -999.990 S.. R4 1991 08 12 21 10 00 -14.2500 -170.5700 60.30 42.00 18.30 123266 SMO 1991 08 06 00 30 00 2208-66 S co CCGG -999.990 -999.990 *.. R4 1991 08 15 12 04 00 -14.2500 -170.5700 60.30 42.00 18.30 123268 SMO 1991 08 06 00 30 00 2208-66 S co CCGG 63.140 -999.990 S.. R4 1991 08 15 12 20 00 -14.2500 -170.5700 60.30 42.00 18.30 123268 SMO 1991 08 06 01 15 00 2106-66 P co CCGG 66.220 -999.990 ... R4 1991 08 15 12 37 00 -14.2500 -170.5700 47.00 42.00 5.00 123270 SMO 1991 08 06 01 15 00 2106-66 P co CCGG 66.450 -999.990 ... R4 1991 08 15 12 55 00 -14.2500 -170.5700 47.00 42.00 5.00 123270 SMO 1991 08 06 01 15 00 3185-66 T co CCGG 65.290 -999.990 ... R4 1991 08 16 10 50 00 -14.2500 -170.5700 44.00 42.00 2.00 123271 SMO 1991 08 06 01 15 00 3185-66 T co CCGG 65.520 -999.990 ... R4 1991 08 16 11 08 00 -14.2500 -170.5700 44.00 42.00 2.00 123271 SMO 1991 08 06 01 15 00 3186-66 T co CCGG 64.790 -999.990 ... R4 1991 08 15 14 51 00 -14.2500 -170.5700 44.00 42.00 2.00 123272 SMO 1991 08 06 01 15 00 3186-66 T co CCGG 63.690 -999.990 ... R4 1991 08 15 15 08 00 -14.2500 -170.5700 44.00 42.00 2.00 123272 SMO 1991 08 14 23 20 00 2096-66 P co CCGG 73.100 -999.990 ... R4 1991 09 10 08 56 00 -14.2500 -170.5700 47.00 42.00 5.00 123274 SMO 1991 08 14 23 20 00 2096-66 P co CCGG 73.810 -999.990 ... R4 1991 09 10 09 13 00 -14.2500 -170.5700 47.00 42.00 5.00 123274 SMO 1991 08 14 23 20 00 3055-66 T co CCGG 69.330 -999.990 P.. R4 1991 08 28 16 23 00 -14.2500 -170.5700 44.00 42.00 2.00 123275 SMO 1991 08 14 23 20 00 3055-66 T co CCGG 68.870 -999.990 P.. R4 1991 08 28 16 41 00 -14.2500 -170.5700 44.00 42.00 2.00 123275 SMO 1991 08 14 23 20 00 3056-66 T co CCGG 75.010 -999.990 P.. R4 1991 08 28 16 58 00 -14.2500 -170.5700 44.00 42.00 2.00 123276 SMO 1991 08 14 23 20 00 3056-66 T co CCGG 75.180 -999.990 P.. R4 1991 08 28 17 16 00 -14.2500 -170.5700 44.00 42.00 2.00 123276 SMO 1991 08 15 00 07 00 2150-66 S co CCGG 68.730 -999.990 S.. R4 1991 09 10 08 23 00 -14.2500 -170.5700 60.30 42.00 18.30 123278 SMO 1991 08 15 00 07 00 2150-66 S co CCGG 67.340 -999.990 S.. R4 1991 09 10 08 39 00 -14.2500 -170.5700 60.30 42.00 18.30 123278 SMO 1991 08 21 22 44 00 2280-66 S co CCGG 63.730 -999.990 S.. R4 1991 08 30 10 57 00 -14.2500 -170.5700 60.30 42.00 18.30 123280 SMO 1991 08 21 22 44 00 2280-66 S co CCGG 63.450 -999.990 S.. R4 1991 08 30 11 13 00 -14.2500 -170.5700 60.30 42.00 18.30 123280 SMO 1991 08 21 23 15 00 2282-66 P co CCGG 67.180 -999.990 ... R4 1991 08 30 11 29 00 -14.2500 -170.5700 47.00 42.00 5.00 123282 SMO 1991 08 21 23 15 00 2282-66 P co CCGG 68.110 -999.990 ... R4 1991 08 30 11 47 00 -14.2500 -170.5700 47.00 42.00 5.00 123282 SMO 1991 08 21 23 15 00 3009-66 T co CCGG 67.250 -999.990 ... R4 1991 08 30 09 48 00 -14.2500 -170.5700 44.00 42.00 2.00 123283 SMO 1991 08 21 23 15 00 3009-66 T co CCGG 68.880 -999.990 ... R4 1991 08 30 10 06 00 -14.2500 -170.5700 44.00 42.00 2.00 123283 SMO 1991 08 29 01 35 00 2088-66 P co CCGG 72.270 -999.990 ... R4 1991 09 10 10 02 00 -14.2500 -170.5700 47.00 42.00 5.00 123285 SMO 1991 08 29 01 35 00 2088-66 P co CCGG 72.360 -999.990 ... R4 1991 09 10 10 19 00 -14.2500 -170.5700 47.00 42.00 5.00 123285 SMO 1991 08 29 01 35 00 3095-66 T co CCGG 72.960 -999.990 ... R4 1991 09 12 15 19 00 -14.2500 -170.5700 44.00 42.00 2.00 123286 SMO 1991 08 29 01 35 00 3095-66 T co CCGG 73.230 -999.990 ... R4 1991 09 12 15 37 00 -14.2500 -170.5700 44.00 42.00 2.00 123286 SMO 1991 08 29 01 35 00 3096-66 T co CCGG 71.570 -999.990 ... R4 1991 09 16 10 46 00 -14.2500 -170.5700 44.00 42.00 2.00 123287 SMO 1991 08 29 01 35 00 3096-66 T co CCGG 71.470 -999.990 ... R4 1991 09 16 11 05 00 -14.2500 -170.5700 44.00 42.00 2.00 123287 SMO 1991 08 29 01 45 00 2058-66 S co CCGG 67.040 -999.990 S.. R4 1991 09 10 09 29 00 -14.2500 -170.5700 60.30 42.00 18.30 123289 SMO 1991 08 29 01 45 00 2058-66 S co CCGG 67.490 -999.990 S.. R4 1991 09 10 09 45 00 -14.2500 -170.5700 60.30 42.00 18.30 123289 SMO 1991 09 04 21 13 00 2008-66 S co CCGG 69.440 -999.990 S.. R4 1991 09 12 16 37 00 -14.2500 -170.5700 60.30 42.00 18.30 123291 SMO 1991 09 04 21 13 00 2008-66 S co CCGG 69.030 -999.990 S.. R4 1991 09 12 16 53 00 -14.2500 -170.5700 60.30 42.00 18.30 123291 SMO 1991 09 04 21 40 00 2010-66 P co CCGG 72.270 -999.990 ... R4 1991 09 12 18 49 00 -14.2500 -170.5700 47.00 42.00 5.00 123293 SMO 1991 09 04 21 40 00 2010-66 P co CCGG 71.730 -999.990 ... R4 1991 09 12 19 06 00 -14.2500 -170.5700 47.00 42.00 5.00 123293 SMO 1991 09 04 21 40 00 3365-66 T co CCGG 69.380 -999.990 ... R4 1991 09 16 09 35 00 -14.2500 -170.5700 44.00 42.00 2.00 123294 SMO 1991 09 04 21 40 00 3365-66 T co CCGG 69.350 -999.990 ... R4 1991 09 16 09 53 00 -14.2500 -170.5700 44.00 42.00 2.00 123294 SMO 1991 09 04 21 40 00 3366-66 T co CCGG 70.030 -999.990 ... R4 1991 09 16 10 10 00 -14.2500 -170.5700 44.00 42.00 2.00 123295 SMO 1991 09 04 21 40 00 3366-66 T co CCGG 68.910 -999.990 ... R4 1991 09 16 10 28 00 -14.2500 -170.5700 44.00 42.00 2.00 123295 SMO 1991 09 12 02 43 00 2214-66 S co CCGG 80.850 -999.990 S.. R4 1991 09 20 09 28 00 -14.2500 -170.5700 60.30 42.00 18.30 123297 SMO 1991 09 12 02 43 00 2214-66 S co CCGG 80.230 -999.990 S.. R4 1991 09 20 09 44 00 -14.2500 -170.5700 60.30 42.00 18.30 123297 SMO 1991 09 12 03 15 00 2270-66 P co CCGG 84.820 -999.990 ... R4 1991 09 20 10 01 00 -14.2500 -170.5700 47.00 42.00 5.00 123299 SMO 1991 09 12 03 15 00 2270-66 P co CCGG 86.080 -999.990 ... R4 1991 09 20 10 19 00 -14.2500 -170.5700 47.00 42.00 5.00 123299 SMO 1991 09 12 03 15 00 3321-66 T co CCGG 85.870 -999.990 ... R4 1991 09 23 14 31 00 -14.2500 -170.5700 44.00 42.00 2.00 123300 SMO 1991 09 12 03 15 00 3321-66 T co CCGG 85.300 -999.990 ... R4 1991 09 23 14 50 00 -14.2500 -170.5700 44.00 42.00 2.00 123300 SMO 1991 09 12 03 15 00 3322-66 T co CCGG 81.310 -999.990 ... R4 1991 09 23 15 43 00 -14.2500 -170.5700 44.00 42.00 2.00 123301 SMO 1991 09 12 03 15 00 3322-66 T co CCGG 83.160 -999.990 ... R4 1991 09 23 16 01 00 -14.2500 -170.5700 44.00 42.00 2.00 123301 SMO 1991 09 16 22 30 00 2072-66 S co CCGG 80.910 -999.990 S.. R4 1991 09 23 20 20 00 -14.2500 -170.5700 60.30 42.00 18.30 123303 SMO 1991 09 16 22 30 00 2072-66 S co CCGG 81.840 -999.990 S.. R4 1991 09 23 20 37 00 -14.2500 -170.5700 60.30 42.00 18.30 123303 SMO 1991 09 16 23 15 00 2236-66 P co CCGG 84.220 -999.990 ... R4 1991 09 23 20 53 00 -14.2500 -170.5700 47.00 42.00 5.00 123305 SMO 1991 09 16 23 15 00 2236-66 P co CCGG 85.010 -999.990 ... R4 1991 09 23 21 11 00 -14.2500 -170.5700 47.00 42.00 5.00 123305 SMO 1991 09 16 23 15 00 3319-66 T co CCGG 82.360 -999.990 ... R4 1991 09 23 15 07 00 -14.2500 -170.5700 44.00 42.00 2.00 123306 SMO 1991 09 16 23 15 00 3319-66 T co CCGG 82.040 -999.990 ... R4 1991 09 23 15 25 00 -14.2500 -170.5700 44.00 42.00 2.00 123306 SMO 1991 09 16 23 15 00 3320-66 T co CCGG 83.040 -999.990 ... R4 1991 09 23 16 18 00 -14.2500 -170.5700 44.00 42.00 2.00 123307 SMO 1991 09 16 23 15 00 3320-66 T co CCGG 83.340 -999.990 ... R4 1991 09 23 16 36 00 -14.2500 -170.5700 44.00 42.00 2.00 123307 SMO 1991 09 23 21 39 00 2046-66 S co CCGG 86.420 -999.990 S.. R4 1991 10 03 09 24 00 -14.2500 -170.5700 60.30 42.00 18.30 123309 SMO 1991 09 23 21 39 00 2046-66 S co CCGG 84.810 -999.990 S.. R4 1991 10 03 09 40 00 -14.2500 -170.5700 60.30 42.00 18.30 123309 SMO 1991 09 23 22 05 00 2218-66 P co CCGG 87.340 -999.990 ... R4 1991 10 03 08 50 00 -14.2500 -170.5700 47.00 42.00 5.00 123311 SMO 1991 09 23 22 05 00 2218-66 P co CCGG 88.770 -999.990 ... R4 1991 10 03 09 08 00 -14.2500 -170.5700 47.00 42.00 5.00 123311 SMO 1991 09 23 22 05 00 3323-66 T co CCGG 85.660 -999.990 ... R4 1991 10 07 12 17 00 -14.2500 -170.5700 44.00 42.00 2.00 123312 SMO 1991 09 23 22 05 00 3324-66 T co CCGG 86.500 -999.990 ... R4 1991 10 07 12 34 00 -14.2500 -170.5700 44.00 42.00 2.00 123313 SMO 1991 09 30 22 49 00 2357-66 S co CCGG 89.160 -999.990 S.. R4 1991 10 24 10 05 00 -14.2500 -170.5700 60.30 42.00 18.30 123314 SMO 1991 09 30 22 49 00 2358-66 S co CCGG 88.830 -999.990 S.. R4 1991 10 24 10 21 00 -14.2500 -170.5700 60.30 42.00 18.30 123315 SMO 1991 09 30 23 40 00 2359-66 P co CCGG 93.950 -999.990 ... R4 1991 10 23 16 06 00 -14.2500 -170.5700 47.00 42.00 5.00 123316 SMO 1991 09 30 23 40 00 2360-66 P co CCGG 93.260 -999.990 ... R4 1991 10 23 16 22 00 -14.2500 -170.5700 47.00 42.00 5.00 123317 SMO 1991 09 30 23 40 00 3317-66 T co CCGG 87.350 -999.990 ... R4 1991 10 07 10 58 00 -14.2500 -170.5700 44.00 42.00 2.00 123318 SMO 1991 09 30 23 40 00 3318-66 T co CCGG 87.730 -999.990 ... R4 1991 10 07 11 15 00 -14.2500 -170.5700 44.00 42.00 2.00 123319 SMO 1991 10 08 00 15 00 2311-66 S co CCGG 83.160 -999.990 S.. R4 1991 10 18 08 57 00 -14.2500 -170.5700 60.30 42.00 18.30 123320 SMO 1991 10 08 00 15 00 2312-66 S co CCGG 82.680 -999.990 S.. R4 1991 10 18 09 13 00 -14.2500 -170.5700 60.30 42.00 18.30 123321 SMO 1991 10 08 00 42 00 2031-66 P co CCGG 85.860 -999.990 ... R4 1991 10 18 09 30 00 -14.2500 -170.5700 47.00 42.00 5.00 123322 SMO 1991 10 08 00 42 00 2032-66 P co CCGG 87.290 -999.990 ... R4 1991 10 18 09 47 00 -14.2500 -170.5700 47.00 42.00 5.00 123323 SMO 1991 10 08 00 42 00 3079-66 T co CCGG 83.770 -999.990 ... R4 1991 10 30 11 20 00 -14.2500 -170.5700 44.00 42.00 2.00 123324 SMO 1991 10 08 00 42 00 3080-66 T co CCGG 86.780 -999.990 ... R4 1991 10 30 11 37 00 -14.2500 -170.5700 44.00 42.00 2.00 123325 SMO 1991 10 17 02 45 00 2131-66 S co CCGG 78.160 -999.990 S.. R4 1991 10 23 16 39 00 -14.2500 -170.5700 60.30 42.00 18.30 123326 SMO 1991 10 17 02 45 00 2132-66 S co CCGG 80.760 -999.990 S.. R4 1991 10 23 16 55 00 -14.2500 -170.5700 60.30 42.00 18.30 123327 SMO 1991 10 17 03 25 00 2175-66 P co CCGG 80.880 -999.990 ... R4 1991 10 23 15 32 00 -14.2500 -170.5700 47.00 42.00 5.00 123328 SMO 1991 10 17 03 25 00 2176-66 P co CCGG 80.330 -999.990 ... R4 1991 10 23 15 49 00 -14.2500 -170.5700 47.00 42.00 5.00 123329 SMO 1991 10 17 03 25 00 3135-66 T co CCGG 81.980 -999.990 ... R4 1991 10 30 12 28 00 -14.2500 -170.5700 44.00 42.00 2.00 123330 SMO 1991 10 17 03 25 00 3136-66 T co CCGG 79.810 -999.990 ... R4 1991 10 30 12 46 00 -14.2500 -170.5700 44.00 42.00 2.00 123331 SMO 1991 10 22 00 27 00 2161-66 S co CCGG 82.380 -999.990 S.. R4 1991 10 31 09 52 00 -14.2500 -170.5700 60.30 42.00 18.30 123332 SMO 1991 10 22 00 27 00 2162-66 S co CCGG 83.340 -999.990 S.. R4 1991 10 31 10 08 00 -14.2500 -170.5700 60.30 42.00 18.30 123333 SMO 1991 10 22 02 20 00 2197-66 P co CCGG 83.210 -999.990 ... R4 1991 10 31 10 25 00 -14.2500 -170.5700 47.00 42.00 5.00 123334 SMO 1991 10 22 02 20 00 2198-66 P co CCGG 84.980 -999.990 ... R4 1991 10 31 10 42 00 -14.2500 -170.5700 47.00 42.00 5.00 123335 SMO 1991 10 22 02 20 00 3207-66 T co CCGG 80.530 -999.990 ... R4 1991 11 05 11 27 00 -14.2500 -170.5700 44.00 42.00 2.00 123336 SMO 1991 10 22 02 20 00 3208-66 T co CCGG 82.680 -999.990 ... R4 1991 11 05 11 44 00 -14.2500 -170.5700 44.00 42.00 2.00 123337 SMO 1991 10 29 00 40 00 2065-66 S co CCGG 80.100 -999.990 S.. R4 1991 11 05 14 35 00 -14.2500 -170.5700 60.30 42.00 18.30 123338 SMO 1991 10 29 00 40 00 2066-66 S co CCGG 79.370 -999.990 S.. R4 1991 11 05 14 51 00 -14.2500 -170.5700 60.30 42.00 18.30 123339 SMO 1991 10 29 01 25 00 2063-66 P co CCGG 83.090 -999.990 ... R4 1991 11 05 14 02 00 -14.2500 -170.5700 47.00 42.00 5.00 123340 SMO 1991 10 29 01 25 00 2064-66 P co CCGG 81.710 -999.990 ... R4 1991 11 05 14 19 00 -14.2500 -170.5700 47.00 42.00 5.00 123341 SMO 1991 10 29 01 25 00 3347-66 T co CCGG 79.550 -999.990 ... R4 1991 11 05 09 35 00 -14.2500 -170.5700 44.00 42.00 2.00 123342 SMO 1991 10 29 01 25 00 3348-66 T co CCGG 80.160 -999.990 ... R4 1991 11 05 09 52 00 -14.2500 -170.5700 44.00 42.00 2.00 123343 SMO 1991 11 05 23 30 00 2353-66 P co CCGG -999.990 -999.990 *.. R4 1991 12 04 14 27 00 -14.2500 -170.5700 47.00 42.00 5.00 123344 SMO 1991 11 05 23 30 00 2354-66 P co CCGG -999.990 -999.990 *.. R4 1991 12 04 14 43 00 -14.2500 -170.5700 47.00 42.00 5.00 123345 SMO 1991 11 05 23 30 00 3255-66 T co CCGG 72.060 -999.990 ... R4 1991 11 26 13 08 00 -14.2500 -170.5700 44.00 42.00 2.00 123346 SMO 1991 11 05 23 30 00 3256-66 T co CCGG 71.580 -999.990 ... R4 1991 11 26 13 26 00 -14.2500 -170.5700 44.00 42.00 2.00 123347 SMO 1991 11 06 00 15 00 2177-66 S co CCGG -999.990 -999.990 *.. R4 1991 12 04 15 00 00 -14.2500 -170.5700 60.30 42.00 18.30 123348 SMO 1991 11 06 00 15 00 2178-66 S co CCGG -999.990 -999.990 *.. R4 1991 12 04 15 16 00 -14.2500 -170.5700 60.30 42.00 18.30 123349 SMO 1991 11 12 23 15 00 2139-66 S co CCGG -999.990 -999.990 *.. R4 1991 12 04 13 54 00 -14.2500 -170.5700 60.30 42.00 18.30 123350 SMO 1991 11 12 23 15 00 2140-66 S co CCGG -999.990 -999.990 *.. R4 1991 12 04 14 10 00 -14.2500 -170.5700 60.30 42.00 18.30 123351 SMO 1991 11 12 23 50 00 2259-66 P co CCGG -999.990 -999.990 *.. R4 1991 12 04 17 33 00 -14.2500 -170.5700 47.00 42.00 5.00 123352 SMO 1991 11 12 23 50 00 2260-66 P co CCGG -999.990 -999.990 *.. R4 1991 12 04 17 50 00 -14.2500 -170.5700 47.00 42.00 5.00 123353 SMO 1991 11 12 23 50 00 3183-66 T co CCGG 81.630 -999.990 ... R4 1991 11 26 12 33 00 -14.2500 -170.5700 44.00 42.00 2.00 123354 SMO 1991 11 12 23 50 00 3184-66 T co CCGG 81.350 -999.990 ... R4 1991 11 26 12 51 00 -14.2500 -170.5700 44.00 42.00 2.00 123355 SMO 1991 11 19 23 15 00 2295-66 P co CCGG 85.490 -999.990 ... R4 1991 12 06 15 09 00 -14.2500 -170.5700 47.00 42.00 5.00 123356 SMO 1991 11 19 23 15 00 2296-66 P co CCGG 84.170 -999.990 ... R4 1991 12 06 15 26 00 -14.2500 -170.5700 47.00 42.00 5.00 123357 SMO 1991 11 19 23 15 00 3153-66 T co CCGG 74.040 -999.990 P.. R4 1991 12 09 14 39 00 -14.2500 -170.5700 44.00 42.00 2.00 123358 SMO 1991 11 19 23 15 00 3154-66 T co CCGG 84.640 -999.990 P.. R4 1991 12 09 14 56 00 -14.2500 -170.5700 44.00 42.00 2.00 123359 SMO 1991 11 19 23 45 00 2115-66 S co CCGG 77.270 -999.990 S.. R4 1991 12 06 15 42 00 -14.2500 -170.5700 60.30 42.00 18.30 123360 SMO 1991 11 19 23 45 00 2116-66 S co CCGG 78.000 -999.990 S.. R4 1991 12 06 15 58 00 -14.2500 -170.5700 60.30 42.00 18.30 123361 SMO 1991 11 26 23 10 00 2097-66 P co CCGG 80.420 -999.990 ... R4 1991 12 11 09 05 00 -14.2500 -170.5700 47.00 42.00 5.00 123362 SMO 1991 11 26 23 10 00 2098-66 P co CCGG 79.510 -999.990 ... R4 1991 12 11 09 21 00 -14.2500 -170.5700 47.00 42.00 5.00 123363 SMO 1991 11 26 23 10 00 3273-66 T co CCGG -999.990 -999.990 *.. R4 1991 12 09 17 59 00 -14.2500 -170.5700 44.00 42.00 2.00 123364 SMO 1991 11 26 23 10 00 3274-66 T co CCGG 94.840 -999.990 .X. R4 1991 12 09 18 17 00 -14.2500 -170.5700 44.00 42.00 2.00 123365 SMO 1991 11 26 23 35 00 2129-66 S co CCGG 75.920 -999.990 S.. R4 1991 12 11 11 21 00 -14.2500 -170.5700 60.30 42.00 18.30 123366 SMO 1991 11 26 23 35 00 2130-66 S co CCGG 75.840 -999.990 S.. R4 1991 12 11 11 37 00 -14.2500 -170.5700 60.30 42.00 18.30 123367 SMO 1991 12 03 22 50 00 2341-66 P co CCGG 78.690 -999.990 ... R4 1991 12 18 16 21 00 -14.2500 -170.5700 47.00 42.00 5.00 123368 SMO 1991 12 03 22 50 00 2342-66 P co CCGG 76.950 -999.990 ... R4 1991 12 18 16 38 00 -14.2500 -170.5700 47.00 42.00 5.00 123369 SMO 1991 12 03 22 50 00 3313-66 T co CCGG 73.070 -999.990 ... R4 1992 01 08 14 19 00 -14.2500 -170.5700 44.00 42.00 2.00 123370 SMO 1991 12 03 22 50 00 3314-66 T co CCGG 73.720 -999.990 ... R4 1992 01 08 14 37 00 -14.2500 -170.5700 44.00 42.00 2.00 123371 SMO 1991 12 04 01 35 00 2199-66 S co CCGG 71.840 -999.990 S.. R4 1991 12 18 15 48 00 -14.2500 -170.5700 60.30 42.00 18.30 123372 SMO 1991 12 04 01 35 00 2200-66 S co CCGG 72.200 -999.990 S.. R4 1991 12 18 16 04 00 -14.2500 -170.5700 60.30 42.00 18.30 123373 SMO 1991 12 17 22 25 00 2165-66 S co CCGG 83.290 -999.990 S.. R4 1991 12 30 10 34 00 -14.2500 -170.5700 60.30 42.00 18.30 123374 SMO 1991 12 17 22 25 00 2166-66 S co CCGG 84.020 -999.990 S.. R4 1991 12 30 10 50 00 -14.2500 -170.5700 60.30 42.00 18.30 123375 SMO 1991 12 17 23 00 00 2149-66 P co CCGG 89.660 -999.990 .X. R4 1991 12 27 14 30 00 -14.2500 -170.5700 47.00 42.00 5.00 123376 SMO 1991 12 17 23 00 00 2150-66 P co CCGG 88.230 -999.990 .X. R4 1991 12 27 14 47 00 -14.2500 -170.5700 47.00 42.00 5.00 123377 SMO 1991 12 17 23 00 00 3279-66 T co CCGG 82.630 -999.990 ... R4 1992 01 08 16 04 00 -14.2500 -170.5700 44.00 42.00 2.00 123378 SMO 1991 12 17 23 00 00 3280-66 T co CCGG 84.790 -999.990 ... R4 1992 01 08 16 21 00 -14.2500 -170.5700 44.00 42.00 2.00 123379 SMO 1991 12 23 23 20 00 2349-66 P co CCGG 76.930 -999.990 ... R4 1992 01 10 11 53 00 -14.2500 -170.5700 47.00 42.00 5.00 123380 SMO 1991 12 23 23 20 00 2350-66 P co CCGG 76.700 -999.990 ... R4 1992 01 10 12 10 00 -14.2500 -170.5700 47.00 42.00 5.00 123381 SMO 1991 12 23 23 20 00 3453-66 T co CCGG 73.520 -999.990 ... R4 1992 01 09 13 37 00 -14.2500 -170.5700 44.00 42.00 2.00 123382 SMO 1991 12 23 23 20 00 3454-66 T co CCGG 71.890 -999.990 ... R4 1992 01 09 13 55 00 -14.2500 -170.5700 44.00 42.00 2.00 123383 SMO 1991 12 24 00 15 00 2207-66 S co CCGG 72.330 -999.990 S.. R4 1992 01 10 15 11 00 -14.2500 -170.5700 60.30 42.00 18.30 123384 SMO 1991 12 24 00 15 00 2208-66 S co CCGG 71.810 -999.990 S.. R4 1992 01 10 15 27 00 -14.2500 -170.5700 60.30 42.00 18.30 123385 SMO 1991 12 30 22 26 00 2281-66 S co CCGG 66.450 -999.990 S.. R4 1992 01 14 10 59 00 -14.2500 -170.5700 60.30 42.00 18.30 123386 SMO 1991 12 30 22 26 00 2282-66 S co CCGG 66.910 -999.990 S.. R4 1992 01 14 11 15 00 -14.2500 -170.5700 60.30 42.00 18.30 123387 SMO 1991 12 30 23 05 00 2351-66 P co CCGG 71.620 -999.990 ... R4 1992 01 14 10 26 00 -14.2500 -170.5700 47.00 42.00 5.00 123388 SMO 1991 12 30 23 05 00 2352-66 P co CCGG 70.020 -999.990 ... R4 1992 01 14 10 43 00 -14.2500 -170.5700 47.00 42.00 5.00 123389 SMO 1991 12 30 23 05 00 3095-66 T co CCGG 68.830 -999.990 ... R4 1992 01 09 13 02 00 -14.2500 -170.5700 44.00 42.00 2.00 123390 SMO 1991 12 30 23 05 00 3096-66 T co CCGG 68.100 -999.990 ... R4 1992 01 09 13 19 00 -14.2500 -170.5700 44.00 42.00 2.00 123391 SMO 1992 01 10 00 23 00 2239-66 S co CCGG 67.060 -999.990 S.. R4 1992 01 29 12 25 00 -14.2500 -170.5700 60.30 42.00 18.30 123392 SMO 1992 01 10 00 23 00 2240-66 S co CCGG 65.630 -999.990 S.. R4 1992 01 29 12 41 00 -14.2500 -170.5700 60.30 42.00 18.30 123393 SMO 1992 01 10 01 00 00 3411-66 T co CCGG 66.740 -999.990 ... R4 1992 02 03 12 14 00 -14.2500 -170.5700 44.00 42.00 2.00 123394 SMO 1992 01 10 01 00 00 3412-66 T co CCGG 66.110 -999.990 ... R4 1992 02 03 12 31 00 -14.2500 -170.5700 44.00 42.00 2.00 123395 SMO 1992 01 10 10 00 00 2261-66 P co CCGG 70.750 -999.990 ... R4 1992 01 29 11 52 00 -14.2500 -170.5700 47.00 42.00 5.00 123396 SMO 1992 01 10 10 00 00 2262-66 P co CCGG 69.830 -999.990 ... R4 1992 01 29 12 08 00 -14.2500 -170.5700 47.00 42.00 5.00 123397 SMO 1992 01 18 02 07 00 2153-66 S co CCGG 58.970 -999.990 S.. R4 1992 01 30 10 06 00 -14.2500 -170.5700 60.30 42.00 18.30 123398 SMO 1992 01 18 02 07 00 2154-66 S co CCGG 59.460 -999.990 S.. R4 1992 01 30 10 24 00 -14.2500 -170.5700 60.30 42.00 18.30 123399 SMO 1992 01 18 02 55 00 2195-66 P co CCGG 66.190 -999.990 ... R4 1992 01 30 09 33 00 -14.2500 -170.5700 47.00 42.00 5.00 123400 SMO 1992 01 18 02 55 00 2196-66 P co CCGG 67.160 -999.990 ... R4 1992 01 30 09 50 00 -14.2500 -170.5700 47.00 42.00 5.00 123401 SMO 1992 01 18 02 55 00 3311-66 T co CCGG 60.130 -999.990 ... R4 1992 02 03 11 39 00 -14.2500 -170.5700 44.00 42.00 2.00 123402 SMO 1992 01 18 02 55 00 3312-66 T co CCGG 57.840 -999.990 ... R4 1992 02 03 11 56 00 -14.2500 -170.5700 44.00 42.00 2.00 123403 SMO 1992 01 22 23 36 00 2043-66 S co CCGG 58.940 -999.990 S.. R4 1992 01 30 16 21 00 -14.2500 -170.5700 60.30 42.00 18.30 123404 SMO 1992 01 22 23 36 00 2044-66 S co CCGG 57.630 -999.990 S.. R4 1992 01 30 16 37 00 -14.2500 -170.5700 60.30 42.00 18.30 123405 SMO 1992 01 23 01 10 00 2119-66 P co CCGG 65.690 -999.990 ... R4 1992 01 30 15 47 00 -14.2500 -170.5700 47.00 42.00 5.00 123406 SMO 1992 01 23 01 10 00 2120-66 P co CCGG 63.570 -999.990 ... R4 1992 01 30 16 04 00 -14.2500 -170.5700 47.00 42.00 5.00 123407 SMO 1992 01 23 01 10 00 3157-66 T co CCGG 61.440 -999.990 ... R4 1992 02 03 15 59 00 -14.2500 -170.5700 44.00 42.00 2.00 123408 SMO 1992 01 23 01 10 00 3158-66 T co CCGG 64.830 -999.990 ... R4 1992 02 03 16 17 00 -14.2500 -170.5700 44.00 42.00 2.00 123409 SMO 1992 01 28 01 48 00 2005-66 S co CCGG 54.630 -999.990 S.. R4 1992 02 06 11 20 00 -14.2500 -170.5700 60.30 42.00 18.30 123410 SMO 1992 01 28 01 48 00 2006-66 S co CCGG 54.390 -999.990 S.. R4 1992 02 06 11 36 00 -14.2500 -170.5700 60.30 42.00 18.30 123411 SMO 1992 01 28 02 20 00 2219-66 P co CCGG 58.460 -999.990 ... R4 1992 02 06 11 53 00 -14.2500 -170.5700 47.00 42.00 5.00 123412 SMO 1992 01 28 02 20 00 2220-66 P co CCGG 60.540 -999.990 ... R4 1992 02 06 12 09 00 -14.2500 -170.5700 47.00 42.00 5.00 123413 SMO 1992 01 28 02 20 00 3081-66 T co CCGG 60.170 -999.990 P.. R4 1992 02 03 16 35 00 -14.2500 -170.5700 44.00 42.00 2.00 123414 SMO 1992 01 28 02 20 00 3082-66 T co CCGG 55.960 -999.990 P.. R4 1992 02 03 16 53 00 -14.2500 -170.5700 44.00 42.00 2.00 123415 SMO 1992 02 05 22 10 00 2309-66 S co CCGG 56.320 -999.990 S.. R4 1992 02 12 12 31 00 -14.2500 -170.5700 60.30 42.00 18.30 123416 SMO 1992 02 05 22 10 00 2310-66 S co CCGG 56.370 -999.990 S.. R4 1992 02 12 12 48 00 -14.2500 -170.5700 60.30 42.00 18.30 123417 SMO 1992 02 05 23 05 00 2111-66 P co CCGG 59.830 -999.990 ... R4 1992 02 12 11 59 00 -14.2500 -170.5700 47.00 42.00 5.00 123418 SMO 1992 02 05 23 05 00 2112-66 P co CCGG 60.230 -999.990 ... R4 1992 02 12 12 15 00 -14.2500 -170.5700 47.00 42.00 5.00 123419 SMO 1992 02 05 23 05 00 3299-66 T co CCGG 57.410 -999.990 ... R4 1992 02 21 11 49 00 -14.2500 -170.5700 44.00 42.00 2.00 123420 SMO 1992 02 05 23 05 00 3300-66 T co CCGG 56.700 -999.990 ... R4 1992 02 21 12 07 00 -14.2500 -170.5700 44.00 42.00 2.00 123421 SMO 1992 02 11 01 15 00 2287-66 P co CCGG 60.160 -999.990 ... R4 1992 02 25 12 13 00 -14.2500 -170.5700 47.00 42.00 5.00 123422 SMO 1992 02 11 01 15 00 2288-66 P co CCGG 59.500 -999.990 ... R4 1992 02 25 12 29 00 -14.2500 -170.5700 47.00 42.00 5.00 123423 SMO 1992 02 11 01 15 00 3315-66 T co CCGG 55.890 -999.990 ... R4 1992 02 21 11 14 00 -14.2500 -170.5700 44.00 42.00 2.00 123424 SMO 1992 02 11 01 15 00 3316-66 T co CCGG 55.700 -999.990 ... R4 1992 02 21 11 32 00 -14.2500 -170.5700 44.00 42.00 2.00 123425 SMO 1992 02 11 02 15 00 2063-66 S co CCGG 55.800 -999.990 S.. R4 1992 02 25 12 46 00 -14.2500 -170.5700 60.30 42.00 18.30 123426 SMO 1992 02 11 02 15 00 2064-66 S co CCGG 54.410 -999.990 S.. R4 1992 02 25 13 02 00 -14.2500 -170.5700 60.30 42.00 18.30 123427 SMO 1992 02 19 01 10 00 2073-66 S co CCGG 66.680 -999.990 S.. R4 1992 02 27 09 52 00 -14.2500 -170.5700 60.30 42.00 18.30 123428 SMO 1992 02 19 01 10 00 2074-66 S co CCGG 67.750 -999.990 S.. R4 1992 02 27 10 08 00 -14.2500 -170.5700 60.30 42.00 18.30 123429 SMO 1992 02 19 01 50 00 2267-66 P co CCGG 68.270 -999.990 ... R4 1992 02 27 10 24 00 -14.2500 -170.5700 47.00 42.00 5.00 123430 SMO 1992 02 19 01 50 00 2268-66 P co CCGG 68.840 -999.990 ... R4 1992 02 27 10 41 00 -14.2500 -170.5700 47.00 42.00 5.00 123431 SMO 1992 02 19 01 50 00 3207-66 T co CCGG 66.680 -999.990 ... R4 1992 03 13 08 13 00 -14.2500 -170.5700 44.00 42.00 2.00 123432 SMO 1992 02 19 01 50 00 3208-66 T co CCGG 69.190 -999.990 ... R4 1992 03 13 08 30 00 -14.2500 -170.5700 44.00 42.00 2.00 123433 SMO 1992 02 26 21 49 00 2053-66 S co CCGG 82.220 -999.990 S.. R4 1992 03 23 10 50 00 -14.2500 -170.5700 60.30 42.00 18.30 123434 SMO 1992 02 26 21 49 00 2054-66 S co CCGG 82.570 -999.990 S.. R4 1992 03 23 11 06 00 -14.2500 -170.5700 60.30 42.00 18.30 123435 SMO 1992 02 26 22 15 00 2221-66 P co CCGG 86.970 -999.990 .X. R4 1992 03 23 10 00 00 -14.2500 -170.5700 47.00 42.00 5.00 123436 SMO 1992 02 26 22 15 00 2222-66 P co CCGG 87.210 -999.990 .X. R4 1992 03 23 10 17 00 -14.2500 -170.5700 47.00 42.00 5.00 123437 SMO 1992 02 26 22 15 00 3471-66 T co CCGG 89.850 -999.990 .X. R4 1992 03 13 08 47 00 -14.2500 -170.5700 44.00 42.00 2.00 123438 SMO 1992 02 26 22 15 00 3472-66 T co CCGG 88.790 -999.990 .X. R4 1992 03 13 09 04 00 -14.2500 -170.5700 44.00 42.00 2.00 123439 SMO 1992 03 02 22 09 00 2175-66 S co CCGG 54.690 -999.990 S.. R4 1992 03 11 13 29 00 -14.2500 -170.5700 60.30 42.00 18.30 123440 SMO 1992 03 02 22 09 00 2176-66 S co CCGG 54.540 -999.990 S.. R4 1992 03 11 13 45 00 -14.2500 -170.5700 60.30 42.00 18.30 123441 SMO 1992 03 02 22 50 00 2009-66 P co CCGG 58.580 -999.990 ... R4 1992 03 11 12 56 00 -14.2500 -170.5700 47.00 42.00 5.00 123442 SMO 1992 03 02 22 50 00 2010-66 P co CCGG 57.020 -999.990 ... R4 1992 03 11 13 13 00 -14.2500 -170.5700 47.00 42.00 5.00 123443 SMO 1992 03 02 22 50 00 3357-66 T co CCGG 56.330 -999.990 ... R4 1992 03 18 13 07 00 -14.2500 -170.5700 44.00 42.00 2.00 123444 SMO 1992 03 02 22 50 00 3358-66 T co CCGG 56.360 -999.990 ... R4 1992 03 18 13 25 00 -14.2500 -170.5700 44.00 42.00 2.00 123445 SMO 1992 03 10 00 49 00 2127-66 S co CCGG 87.480 -999.990 S.. R4 1992 03 20 09 48 00 -14.2500 -170.5700 60.30 42.00 18.30 123446 SMO 1992 03 10 00 49 00 2128-66 S co CCGG 86.910 -999.990 S.. R4 1992 03 20 10 05 00 -14.2500 -170.5700 60.30 42.00 18.30 123447 SMO 1992 03 10 01 35 00 2279-66 P co CCGG 267.760 -999.990 .XC R4 1992 03 20 08 10 00 -14.2500 -170.5700 47.00 42.00 5.00 123448 SMO 1992 03 10 01 35 00 2280-66 P co CCGG 267.260 -999.990 .XC R4 1992 03 20 08 26 00 -14.2500 -170.5700 47.00 42.00 5.00 123449 SMO 1992 03 10 01 35 00 3209-66 T co CCGG 82.300 -999.990 .X. R4 1992 03 18 12 32 00 -14.2500 -170.5700 44.00 42.00 2.00 123450 SMO 1992 03 10 01 35 00 3210-66 T co CCGG 82.480 -999.990 .X. R4 1992 03 18 12 49 00 -14.2500 -170.5700 44.00 42.00 2.00 123451 SMO 1992 03 19 03 07 00 2113-66 S co CCGG 55.550 -999.990 S.. R4 1992 03 27 09 25 00 -14.2500 -170.5700 60.30 42.00 18.30 123452 SMO 1992 03 19 03 07 00 2114-66 S co CCGG 56.820 -999.990 S.. R4 1992 03 27 09 41 00 -14.2500 -170.5700 60.30 42.00 18.30 123453 SMO 1992 03 19 03 35 00 2141-66 P co CCGG 57.450 -999.990 ... R4 1992 03 27 08 52 00 -14.2500 -170.5700 47.00 42.00 5.00 123454 SMO 1992 03 19 03 35 00 2142-66 P co CCGG 56.970 -999.990 ... R4 1992 03 27 09 09 00 -14.2500 -170.5700 47.00 42.00 5.00 123455 SMO 1992 03 19 03 35 00 3403-66 T co CCGG 57.120 -999.990 ... R4 1992 04 22 17 54 00 -14.2500 -170.5700 44.00 42.00 2.00 123456 SMO 1992 03 19 03 35 00 3404-66 T co CCGG 56.340 -999.990 ... R4 1992 04 22 18 11 00 -14.2500 -170.5700 44.00 42.00 2.00 123457 SMO 1992 03 24 00 31 00 2119-66 S co CCGG 53.640 -999.990 S.. R4 1992 03 31 10 24 00 -14.2500 -170.5700 60.30 42.00 18.30 123458 SMO 1992 03 24 00 31 00 2120-66 S co CCGG 52.630 -999.990 S.. R4 1992 03 31 10 40 00 -14.2500 -170.5700 60.30 42.00 18.30 123459 SMO 1992 03 24 00 31 00 2120-66 S co CCGG 53.850 -999.990 S.. R4 1992 04 01 11 27 00 -14.2500 -170.5700 60.30 42.00 18.30 123459 SMO 1992 03 24 01 03 00 2239-66 P co CCGG 57.780 -999.990 ... R4 1992 03 31 09 17 00 -14.2500 -170.5700 47.00 42.00 5.00 123460 SMO 1992 03 24 01 03 00 2240-66 P co CCGG 58.090 -999.990 ... R4 1992 03 31 09 33 00 -14.2500 -170.5700 47.00 42.00 5.00 123461 SMO 1992 03 24 01 03 00 3095-66 T co CCGG 54.990 -999.990 ... R4 1992 04 22 17 19 00 -14.2500 -170.5700 44.00 42.00 2.00 123462 SMO 1992 03 24 01 03 00 3096-66 T co CCGG 54.710 -999.990 ... R4 1992 04 22 17 37 00 -14.2500 -170.5700 44.00 42.00 2.00 123463 SMO 1992 03 31 03 07 00 2179-66 S co CCGG 71.570 -999.990 S.. R4 1992 04 10 17 07 00 -14.2500 -170.5700 60.30 42.00 18.30 123464 SMO 1992 03 31 03 07 00 2180-66 S co CCGG 71.730 -999.990 S.. R4 1992 04 10 17 23 00 -14.2500 -170.5700 60.30 42.00 18.30 123465 SMO 1992 03 31 03 42 00 2290-66 P co CCGG 80.320 -999.990 .X. R4 1992 04 10 17 41 00 -14.2500 -170.5700 47.00 42.00 5.00 123467 SMO 1992 04 06 22 48 00 2089-66 S co CCGG 60.460 -999.990 S.. R4 1992 05 28 12 08 00 -14.2500 -170.5700 60.30 42.00 18.30 123468 SMO 1992 04 06 22 48 00 2090-66 S co CCGG 60.550 -999.990 S.. R4 1992 05 28 12 24 00 -14.2500 -170.5700 60.30 42.00 18.30 123469 SMO 1992 04 06 23 25 00 3037-66 T co CCGG 58.700 -999.990 ... R4 1992 04 22 18 29 00 -14.2500 -170.5700 44.00 42.00 2.00 123472 SMO 1992 04 06 23 25 00 3038-66 T co CCGG 59.660 -999.990 ... R4 1992 04 22 18 46 00 -14.2500 -170.5700 44.00 42.00 2.00 123473 SMO 1992 04 06 23 25 00 7-91 P co CCGG 58.990 -999.990 ... R4 1992 04 21 13 52 00 -14.2500 -170.5700 47.00 42.00 5.00 123470 SMO 1992 04 06 23 25 00 8-91 P co CCGG 59.350 -999.990 ... R4 1992 04 21 14 08 00 -14.2500 -170.5700 47.00 42.00 5.00 123471 SMO 1992 04 13 23 49 00 2339-66 S co CCGG 58.540 -999.990 S.. R4 1992 05 28 12 40 00 -14.2500 -170.5700 60.30 42.00 18.30 123474 SMO 1992 04 13 23 49 00 2340-66 S co CCGG 58.610 -999.990 S.. R4 1992 05 28 12 56 00 -14.2500 -170.5700 60.30 42.00 18.30 123475 SMO 1992 04 14 00 30 00 3-91 P co CCGG 58.720 -999.990 ... R4 1992 06 01 07 53 00 -14.2500 -170.5700 47.00 42.00 5.00 123476 SMO 1992 04 14 00 30 00 3063-66 T co CCGG 55.830 -999.990 ... R4 1992 04 22 19 04 00 -14.2500 -170.5700 44.00 42.00 2.00 123478 SMO 1992 04 14 00 30 00 3064-66 T co CCGG 56.250 -999.990 ... R4 1992 04 22 19 21 00 -14.2500 -170.5700 44.00 42.00 2.00 123479 SMO 1992 04 14 00 30 00 4-91 P co CCGG 58.370 -999.990 ... R4 1992 06 01 08 09 00 -14.2500 -170.5700 47.00 42.00 5.00 123477 SMO 1992 04 20 22 45 00 2051-66 S co CCGG 58.780 -999.990 S.. R4 1992 05 28 07 04 00 -14.2500 -170.5700 60.30 42.00 18.30 123480 SMO 1992 04 20 22 45 00 2052-66 S co CCGG 59.810 -999.990 S.. R4 1992 05 28 07 20 00 -14.2500 -170.5700 60.30 42.00 18.30 123481 SMO 1992 04 20 23 42 00 3019-66 T co CCGG 61.690 -999.990 ... R4 1992 06 01 13 38 00 -14.2500 -170.5700 44.00 42.00 2.00 123484 SMO 1992 04 20 23 42 00 3020-66 T co CCGG 62.150 -999.990 ... R4 1992 06 01 13 55 00 -14.2500 -170.5700 44.00 42.00 2.00 123485 SMO 1992 04 20 23 42 00 5-91 P co CCGG 62.260 -999.990 ... R4 1992 06 01 07 20 00 -14.2500 -170.5700 47.00 42.00 5.00 123482 SMO 1992 04 20 23 42 00 6-91 P co CCGG 61.260 -999.990 ... R4 1992 06 01 07 36 00 -14.2500 -170.5700 47.00 42.00 5.00 123483 SMO 1992 04 29 02 26 00 2223-66 S co CCGG 57.470 -999.990 S.. R4 1992 05 28 08 41 00 -14.2500 -170.5700 60.30 42.00 18.30 123486 SMO 1992 04 29 02 26 00 2224-66 S co CCGG 59.250 -999.990 S.. R4 1992 05 28 08 57 00 -14.2500 -170.5700 60.30 42.00 18.30 123487 SMO 1992 04 29 03 05 00 19-91 P co CCGG 58.420 -999.990 ... R4 1992 05 21 18 47 00 -14.2500 -170.5700 47.00 42.00 5.00 123488 SMO 1992 04 29 03 05 00 20-91 P co CCGG 58.460 -999.990 ... R4 1992 05 21 19 03 00 -14.2500 -170.5700 47.00 42.00 5.00 123489 SMO 1992 04 29 03 05 00 3531-66 T co CCGG 59.400 -999.990 ... R4 1992 06 01 11 59 00 -14.2500 -170.5700 44.00 42.00 2.00 123490 SMO 1992 04 29 03 05 00 3532-66 T co CCGG 58.850 -999.990 ... R4 1992 06 01 12 16 00 -14.2500 -170.5700 44.00 42.00 2.00 123491 SMO 1992 05 04 23 05 00 21-91 P co CCGG 60.700 -999.990 ... R4 1992 05 21 19 20 00 -14.2500 -170.5700 47.00 42.00 5.00 123492 SMO 1992 05 04 23 05 00 22-91 P co CCGG 60.660 -999.990 ... R4 1992 05 21 19 37 00 -14.2500 -170.5700 47.00 42.00 5.00 123493 SMO 1992 05 04 23 05 00 3111-66 T co CCGG 63.000 -999.990 P.. R4 1992 06 11 09 10 00 -14.2500 -170.5700 44.00 42.00 2.00 123494 SMO 1992 05 04 23 05 00 3112-66 T co CCGG 340.560 -999.990 P.C R4 1992 06 11 09 27 00 -14.2500 -170.5700 44.00 42.00 2.00 123495 SMO 1992 05 05 01 32 00 2267-66 S co CCGG 58.100 -999.990 S.. R4 1992 05 28 15 34 00 -14.2500 -170.5700 60.30 42.00 18.30 123496 SMO 1992 05 05 01 32 00 2268-66 S co CCGG 58.110 -999.990 S.. R4 1992 05 28 15 50 00 -14.2500 -170.5700 60.30 42.00 18.30 123497 SMO 1992 05 11 22 40 00 2159-66 S co CCGG 61.130 -999.990 S.. R4 1992 05 28 15 01 00 -14.2500 -170.5700 60.30 42.00 18.30 123498 SMO 1992 05 11 22 40 00 2160-66 S co CCGG 61.250 -999.990 S.. R4 1992 05 28 15 17 00 -14.2500 -170.5700 60.30 42.00 18.30 123499 SMO 1992 05 11 23 15 00 2063-66 P co CCGG 64.320 -999.990 ... R4 1992 05 28 13 46 00 -14.2500 -170.5700 47.00 42.00 5.00 123500 SMO 1992 05 11 23 15 00 2064-66 P co CCGG 63.810 -999.990 ... R4 1992 05 28 14 03 00 -14.2500 -170.5700 47.00 42.00 5.00 123501 SMO 1992 05 11 23 15 00 3027-66 T co CCGG 69.420 -999.990 P.. R4 1992 06 11 08 34 00 -14.2500 -170.5700 44.00 42.00 2.00 123502 SMO 1992 05 11 23 15 00 3028-66 T co CCGG 63.850 -999.990 P.. R4 1992 06 11 08 52 00 -14.2500 -170.5700 44.00 42.00 2.00 123503 SMO 1992 05 21 00 45 00 2173-66 S co CCGG 60.050 -999.990 S.. R4 1992 06 10 15 40 00 -14.2500 -170.5700 60.30 42.00 18.30 123504 SMO 1992 05 21 00 45 00 2174-66 S co CCGG 59.110 -999.990 S.. R4 1992 06 10 15 56 00 -14.2500 -170.5700 60.30 42.00 18.30 123505 SMO 1992 05 21 01 15 00 2093-66 P co CCGG 59.960 -999.990 ... R4 1992 05 28 13 13 00 -14.2500 -170.5700 47.00 42.00 5.00 123506 SMO 1992 05 21 01 15 00 2094-66 P co CCGG 60.520 -999.990 ... R4 1992 05 28 13 30 00 -14.2500 -170.5700 47.00 42.00 5.00 123507 SMO 1992 05 21 01 15 00 3157-66 T co CCGG 61.060 -999.990 ... R4 1992 06 04 19 14 00 -14.2500 -170.5700 44.00 42.00 2.00 123508 SMO 1992 05 21 01 15 00 3158-66 T co CCGG 62.640 -999.990 ... R4 1992 06 04 19 31 00 -14.2500 -170.5700 44.00 42.00 2.00 123509 SMO 1992 05 27 22 08 00 2309-66 S co CCGG 63.000 -999.990 S.. R4 1992 06 10 15 08 00 -14.2500 -170.5700 60.30 42.00 18.30 123510 SMO 1992 05 27 22 08 00 2310-66 S co CCGG 63.710 -999.990 S.. R4 1992 06 10 15 24 00 -14.2500 -170.5700 60.30 42.00 18.30 123511 SMO 1992 05 27 23 08 00 2073-66 P co CCGG 66.940 -999.990 ... R4 1992 06 16 17 52 00 -14.2500 -170.5700 47.00 42.00 5.00 123512 SMO 1992 05 27 23 08 00 2074-66 P co CCGG 68.340 -999.990 ... R4 1992 06 16 18 09 00 -14.2500 -170.5700 47.00 42.00 5.00 123513 SMO 1992 05 27 23 08 00 3201-66 T co CCGG 64.770 -999.990 ... R4 1992 06 04 18 39 00 -14.2500 -170.5700 44.00 42.00 2.00 123514 SMO 1992 05 27 23 08 00 3202-66 T co CCGG 62.270 -999.990 ... R4 1992 06 04 18 56 00 -14.2500 -170.5700 44.00 42.00 2.00 123515 SMO 1992 06 02 00 40 00 2167-66 S co CCGG 62.500 -999.990 S.. R4 1992 06 16 17 19 00 -14.2500 -170.5700 60.30 42.00 18.30 123516 SMO 1992 06 02 00 40 00 2168-66 S co CCGG 62.420 -999.990 S.. R4 1992 06 16 17 35 00 -14.2500 -170.5700 60.30 42.00 18.30 123517 SMO 1992 06 02 01 10 00 3485-66 T co CCGG 60.310 -999.990 ... R4 1992 06 12 15 23 00 -14.2500 -170.5700 44.00 42.00 2.00 123520 SMO 1992 06 02 01 10 00 3486-66 T co CCGG 63.300 -999.990 ... R4 1992 06 12 15 41 00 -14.2500 -170.5700 44.00 42.00 2.00 123521 SMO 1992 06 02 01 10 00 77-91 P co CCGG 63.190 -999.990 ... R4 1992 06 12 14 49 00 -14.2500 -170.5700 47.00 42.00 5.00 123518 SMO 1992 06 02 01 10 00 78-91 P co CCGG 61.830 -999.990 ... R4 1992 06 12 15 06 00 -14.2500 -170.5700 47.00 42.00 5.00 123519 SMO 1992 06 05 23 50 00 41-91 P co CCGG 63.780 -999.990 ... R4 1992 07 15 12 43 00 -14.2500 -170.5700 47.00 42.00 5.00 123522 SMO 1992 06 05 23 50 00 42-91 P co CCGG 65.270 -999.990 ... R4 1992 07 15 12 59 00 -14.2500 -170.5700 47.00 42.00 5.00 123523 SMO 1992 06 09 00 47 00 2363-66 S co CCGG 74.920 -999.990 S.. R4 1992 07 27 14 40 00 -14.2500 -170.5700 60.30 42.00 18.30 123524 SMO 1992 06 09 00 47 00 2364-66 S co CCGG 70.920 -999.990 S.. R4 1992 07 27 14 56 00 -14.2500 -170.5700 60.30 42.00 18.30 123525 SMO 1992 06 09 01 35 00 1-91 P co CCGG 65.460 -999.990 ... R4 1992 06 19 13 47 00 -14.2500 -170.5700 47.00 42.00 5.00 123526 SMO 1992 06 09 01 35 00 2-91 P co CCGG 65.680 -999.990 ... R4 1992 06 19 14 03 00 -14.2500 -170.5700 47.00 42.00 5.00 123527 SMO 1992 06 09 01 35 00 3327-66 T co CCGG -999.990 -999.990 *.. R4 1992 06 19 14 54 00 -14.2500 -170.5700 44.00 42.00 2.00 123528 SMO 1992 06 09 01 35 00 3328-66 T co CCGG 63.570 -999.990 ... R4 1992 06 19 15 11 00 -14.2500 -170.5700 44.00 42.00 2.00 123529 SMO 1992 06 13 01 40 00 55-91 P co CCGG 69.170 -999.990 ... R4 1992 07 15 13 16 00 -14.2500 -170.5700 47.00 42.00 5.00 123530 SMO 1992 06 13 01 40 00 56-91 P co CCGG 69.330 -999.990 ... R4 1992 07 15 13 32 00 -14.2500 -170.5700 47.00 42.00 5.00 123531 SMO 1992 06 16 01 24 00 2101-66 S co CCGG 66.750 -999.990 S.. R4 1992 07 27 15 46 00 -14.2500 -170.5700 60.30 42.00 18.30 123532 SMO 1992 06 16 01 24 00 2102-66 S co CCGG 67.650 -999.990 S.. R4 1992 07 27 16 02 00 -14.2500 -170.5700 60.30 42.00 18.30 123533 SMO 1992 06 16 02 00 00 10-91 P co CCGG 68.860 -999.990 ... R4 1992 06 25 14 38 00 -14.2500 -170.5700 47.00 42.00 5.00 123535 SMO 1992 06 16 02 00 00 3507-66 T co CCGG 68.990 -999.990 ... R4 1992 07 23 11 34 00 -14.2500 -170.5700 44.00 42.00 2.00 123536 SMO 1992 06 16 02 00 00 3508-66 T co CCGG 69.270 -999.990 ... R4 1992 07 23 11 51 00 -14.2500 -170.5700 44.00 42.00 2.00 123537 SMO 1992 06 16 02 00 00 9-91 P co CCGG 66.950 -999.990 ... R4 1992 06 25 14 21 00 -14.2500 -170.5700 47.00 42.00 5.00 123534 SMO 1992 06 19 23 30 00 45-91 P co CCGG 65.870 -999.990 ... R4 1992 06 25 14 54 00 -14.2500 -170.5700 47.00 42.00 5.00 123538 SMO 1992 06 22 22 30 00 3513-66 T co CCGG 69.050 -999.990 ... R4 1992 07 23 12 08 00 -14.2500 -170.5700 44.00 42.00 2.00 123541 SMO 1992 06 22 22 30 00 3514-66 T co CCGG 68.590 -999.990 ... R4 1992 07 23 12 25 00 -14.2500 -170.5700 44.00 42.00 2.00 123542 SMO 1992 06 22 22 30 00 83-91 P co CCGG 69.770 -999.990 ... R4 1992 07 27 10 31 00 -14.2500 -170.5700 47.00 42.00 5.00 123539 SMO 1992 06 22 22 30 00 84-91 P co CCGG 69.280 -999.990 ... R4 1992 07 27 10 48 00 -14.2500 -170.5700 47.00 42.00 5.00 123540 SMO 1992 06 23 00 09 00 2087-66 S co CCGG 67.970 -999.990 S.. R4 1992 07 10 17 28 00 -14.2500 -170.5700 60.30 42.00 18.30 123543 SMO 1992 06 23 00 09 00 2088-66 S co CCGG 68.330 -999.990 S.. R4 1992 07 10 17 44 00 -14.2500 -170.5700 60.30 42.00 18.30 123544 SMO 1992 06 27 01 35 00 27-91 P co CCGG 65.200 -999.990 ... R4 1992 07 09 13 42 00 -14.2500 -170.5700 47.00 42.00 5.00 123545 SMO 1992 06 27 01 35 00 28-91 P co CCGG 66.150 -999.990 ... R4 1992 07 09 13 59 00 -14.2500 -170.5700 47.00 42.00 5.00 123546 SMO 1992 06 29 23 12 00 2313-66 S co CCGG 62.910 -999.990 S.. R4 1992 07 10 16 55 00 -14.2500 -170.5700 60.30 42.00 18.30 123547 SMO 1992 06 29 23 12 00 2314-66 S co CCGG 62.160 -999.990 S.. R4 1992 07 10 17 12 00 -14.2500 -170.5700 60.30 42.00 18.30 123548 SMO 1992 06 29 23 30 00 3225-66 T co CCGG 63.780 -999.990 ... R4 1992 07 23 10 17 00 -14.2500 -170.5700 44.00 42.00 2.00 123551 SMO 1992 06 29 23 30 00 3226-66 T co CCGG 62.000 -999.990 ... R4 1992 07 23 10 34 00 -14.2500 -170.5700 44.00 42.00 2.00 123552 SMO 1992 06 29 23 30 00 47-91 P co CCGG 65.320 -999.990 ... R4 1992 07 09 14 49 00 -14.2500 -170.5700 47.00 42.00 5.00 123549 SMO 1992 06 29 23 30 00 48-91 P co CCGG 64.190 -999.990 ... R4 1992 07 09 15 05 00 -14.2500 -170.5700 47.00 42.00 5.00 123550 SMO 1992 07 03 23 30 00 25-91 P co CCGG 64.730 -999.990 ... R4 1992 07 27 09 25 00 -14.2500 -170.5700 47.00 42.00 5.00 123553 SMO 1992 07 03 23 30 00 26-91 P co CCGG 63.730 -999.990 ... R4 1992 07 27 09 42 00 -14.2500 -170.5700 47.00 42.00 5.00 123554 SMO 1992 07 06 23 19 00 2247-66 S co CCGG 68.030 -999.990 S.. R4 1992 08 25 15 55 00 -14.2500 -170.5700 60.30 42.00 18.30 123555 SMO 1992 07 06 23 19 00 2248-66 S co CCGG 67.680 -999.990 S.. R4 1992 08 25 16 11 00 -14.2500 -170.5700 60.30 42.00 18.30 123556 SMO 1992 07 06 23 50 00 3463-66 T co CCGG 66.140 -999.990 ... R4 1992 07 23 11 00 00 -14.2500 -170.5700 44.00 42.00 2.00 123559 SMO 1992 07 06 23 50 00 65-91 P co CCGG 65.680 -999.990 ... R4 1992 07 27 08 52 00 -14.2500 -170.5700 47.00 42.00 5.00 123557 SMO 1992 07 06 23 50 00 66-91 P co CCGG 66.150 -999.990 ... R4 1992 07 27 09 09 00 -14.2500 -170.5700 47.00 42.00 5.00 123558 SMO 1992 07 10 21 35 00 61-91 P co CCGG 66.740 -999.990 ... R4 1992 07 27 09 58 00 -14.2500 -170.5700 47.00 42.00 5.00 123560 SMO 1992 07 10 21 35 00 62-91 P co CCGG 65.670 -999.990 ... R4 1992 07 27 10 15 00 -14.2500 -170.5700 47.00 42.00 5.00 123561 SMO 1992 07 13 22 22 00 2281-66 S co CCGG 68.900 -999.990 S.. R4 1992 08 25 16 45 00 -14.2500 -170.5700 60.30 42.00 18.30 123562 SMO 1992 07 13 22 22 00 2282-66 S co CCGG 67.160 -999.990 S.. R4 1992 08 25 17 01 00 -14.2500 -170.5700 60.30 42.00 18.30 123563 SMO 1992 07 13 23 15 00 31-91 P co CCGG 67.570 -999.990 ... R4 1992 08 21 18 57 00 -14.2500 -170.5700 47.00 42.00 5.00 123564 SMO 1992 07 13 23 15 00 32-91 P co CCGG 67.540 -999.990 ... R4 1992 08 21 19 13 00 -14.2500 -170.5700 47.00 42.00 5.00 123565 SMO 1992 07 13 23 15 00 3404-66 T co CCGG 65.200 -999.990 ... R4 1992 08 28 10 53 00 -14.2500 -170.5700 44.00 42.00 2.00 123566 SMO 1992 07 20 23 15 00 2343-66 S co CCGG 64.940 -999.990 S.. R4 1992 08 25 17 17 00 -14.2500 -170.5700 60.30 42.00 18.30 123567 SMO 1992 07 20 23 15 00 2344-66 S co CCGG 65.480 -999.990 S.. R4 1992 08 25 17 33 00 -14.2500 -170.5700 60.30 42.00 18.30 123568 SMO 1992 07 20 23 40 00 3037-66 T co CCGG 69.610 -999.990 ... R4 1992 08 28 10 09 00 -14.2500 -170.5700 44.00 42.00 2.00 123571 SMO 1992 07 20 23 40 00 3038-66 T co CCGG 67.650 -999.990 ... R4 1992 08 28 10 26 00 -14.2500 -170.5700 44.00 42.00 2.00 123572 SMO 1992 07 20 23 40 00 7-91 P co CCGG 68.890 -999.990 ... R4 1992 08 24 08 23 00 -14.2500 -170.5700 47.00 42.00 5.00 123569 SMO 1992 07 20 23 40 00 8-91 P co CCGG 69.360 -999.990 ... R4 1992 08 24 08 39 00 -14.2500 -170.5700 47.00 42.00 5.00 123570 SMO 1992 07 27 23 08 00 2237-66 S co CCGG 63.240 -999.990 S.. R4 1992 08 25 13 48 00 -14.2500 -170.5700 60.30 42.00 18.30 123573 SMO 1992 07 27 23 08 00 2238-66 S co CCGG 64.040 -999.990 S.. R4 1992 08 25 14 04 00 -14.2500 -170.5700 60.30 42.00 18.30 123574 SMO 1992 07 27 23 52 00 15-91 P co CCGG 65.410 -999.990 ... R4 1992 08 21 11 09 00 -14.2500 -170.5700 47.00 42.00 5.00 123575 SMO 1992 07 27 23 52 00 16-91 P co CCGG 64.460 -999.990 ... R4 1992 08 21 11 26 00 -14.2500 -170.5700 47.00 42.00 5.00 123576 SMO 1992 08 03 23 20 00 2227-66 S co CCGG 68.000 -999.990 S.. R4 1992 09 09 11 55 00 -14.2500 -170.5700 60.30 42.00 18.30 123577 SMO 1992 08 03 23 20 00 2228-66 S co CCGG 66.150 -999.990 S.. R4 1992 09 09 12 11 00 -14.2500 -170.5700 60.30 42.00 18.30 123578 SMO 1992 08 03 23 55 00 105-91 P co CCGG 68.050 -999.990 ... R4 1992 08 21 11 42 00 -14.2500 -170.5700 47.00 42.00 5.00 123579 SMO 1992 08 03 23 55 00 106-91 P co CCGG 67.920 -999.990 ... R4 1992 08 21 11 59 00 -14.2500 -170.5700 47.00 42.00 5.00 123580 SMO 1992 08 03 23 55 00 3031-66 T co CCGG 67.770 -999.990 ... R4 1992 08 26 10 54 00 -14.2500 -170.5700 44.00 42.00 2.00 123581 SMO 1992 08 03 23 55 00 3032-66 T co CCGG 67.000 -999.990 ... R4 1992 08 26 11 12 00 -14.2500 -170.5700 44.00 42.00 2.00 123582 SMO 1992 08 10 21 05 00 2151-66 S co CCGG 68.550 -999.990 S.. R4 1992 09 09 12 27 00 -14.2500 -170.5700 60.30 42.00 18.30 123583 SMO 1992 08 10 21 05 00 2152-66 S co CCGG 69.030 -999.990 S.. R4 1992 09 09 12 44 00 -14.2500 -170.5700 60.30 42.00 18.30 123584 SMO 1992 08 10 21 35 00 100-91 P co CCGG 71.790 -999.990 ... R4 1992 09 18 12 59 00 -14.2500 -170.5700 47.00 42.00 5.00 123586 SMO 1992 08 10 21 35 00 3307-66 T co CCGG 68.610 -999.990 ... R4 1992 08 26 11 29 00 -14.2500 -170.5700 44.00 42.00 2.00 123587 SMO 1992 08 10 21 35 00 3308-66 T co CCGG 68.590 -999.990 ... R4 1992 08 26 11 47 00 -14.2500 -170.5700 44.00 42.00 2.00 123588 SMO 1992 08 10 21 35 00 99-91 P co CCGG 71.960 -999.990 ... R4 1992 09 18 12 43 00 -14.2500 -170.5700 47.00 42.00 5.00 123585 SMO 1992 08 18 22 45 00 2243-66 S co CCGG 63.120 -999.990 S.. R4 1992 09 09 13 07 00 -14.2500 -170.5700 60.30 42.00 18.30 123589 SMO 1992 08 18 22 45 00 2244-66 S co CCGG 63.490 -999.990 S.. R4 1992 09 09 13 23 00 -14.2500 -170.5700 60.30 42.00 18.30 123590 SMO 1992 08 18 23 10 00 3395-66 T co CCGG 63.030 -999.990 ... R4 1992 09 15 10 50 00 -14.2500 -170.5700 44.00 42.00 2.00 123593 SMO 1992 08 18 23 10 00 3396-66 T co CCGG 63.900 -999.990 ... R4 1992 09 15 11 08 00 -14.2500 -170.5700 44.00 42.00 2.00 123594 SMO 1992 08 18 23 10 00 35-91 P co CCGG 65.390 -999.990 ... R4 1992 09 18 12 10 00 -14.2500 -170.5700 47.00 42.00 5.00 123591 SMO 1992 08 18 23 10 00 36-91 P co CCGG 65.110 -999.990 ... R4 1992 09 18 12 27 00 -14.2500 -170.5700 47.00 42.00 5.00 123592 SMO 1992 08 25 22 06 00 2091-66 S co CCGG 66.830 -999.990 S.. R4 1992 09 09 13 39 00 -14.2500 -170.5700 60.30 42.00 18.30 123595 SMO 1992 08 25 22 06 00 2092-66 S co CCGG 67.950 -999.990 S.. R4 1992 09 09 13 55 00 -14.2500 -170.5700 60.30 42.00 18.30 123596 SMO 1992 08 25 22 35 00 3183-66 T co CCGG 67.550 -999.990 ... R4 1992 09 15 11 25 00 -14.2500 -170.5700 44.00 42.00 2.00 123599 SMO 1992 08 25 22 35 00 3184-66 T co CCGG 68.230 -999.990 ... R4 1992 09 15 11 43 00 -14.2500 -170.5700 44.00 42.00 2.00 123600 SMO 1992 08 25 22 35 00 33-91 P co CCGG 70.510 -999.990 ... R4 1992 09 17 13 48 00 -14.2500 -170.5700 47.00 42.00 5.00 123597 SMO 1992 08 25 22 35 00 34-91 P co CCGG 70.370 -999.990 ... R4 1992 09 17 14 04 00 -14.2500 -170.5700 47.00 42.00 5.00 123598 SMO 1992 08 31 21 30 00 2063-66 S co CCGG 66.340 -999.990 S.. R4 1992 09 24 10 35 00 -14.2500 -170.5700 60.30 42.00 18.30 123601 SMO 1992 08 31 21 30 00 2064-66 S co CCGG 64.800 -999.990 S.. R4 1992 09 24 10 51 00 -14.2500 -170.5700 60.30 42.00 18.30 123602 SMO 1992 08 31 23 25 00 3211-66 T co CCGG 64.920 -999.990 ... R4 1992 09 22 12 44 00 -14.2500 -170.5700 44.00 42.00 2.00 123605 SMO 1992 08 31 23 25 00 3212-66 T co CCGG 66.900 -999.990 ... R4 1992 09 22 13 01 00 -14.2500 -170.5700 44.00 42.00 2.00 123606 SMO 1992 08 31 23 25 00 79-91 P co CCGG 68.730 -999.990 ... R4 1992 09 17 13 15 00 -14.2500 -170.5700 47.00 42.00 5.00 123603 SMO 1992 08 31 23 25 00 80-91 P co CCGG 68.340 -999.990 ... R4 1992 09 17 13 32 00 -14.2500 -170.5700 47.00 42.00 5.00 123604 SMO 1992 09 08 23 30 00 3095-66 T co CCGG 65.090 -999.990 ... R4 1992 09 22 12 09 00 -14.2500 -170.5700 44.00 42.00 2.00 123609 SMO 1992 09 08 23 30 00 3096-66 T co CCGG 64.680 -999.990 ... R4 1992 09 22 12 26 00 -14.2500 -170.5700 44.00 42.00 2.00 123610 SMO 1992 09 08 23 30 00 87-91 P co CCGG 67.470 -999.990 ... R4 1992 10 06 09 03 00 -14.2500 -170.5700 47.00 42.00 5.00 123607 SMO 1992 09 08 23 30 00 88-91 P co CCGG 66.810 -999.990 ... R4 1992 10 06 09 19 00 -14.2500 -170.5700 47.00 42.00 5.00 123608 SMO 1992 09 09 00 05 00 2305-66 S co CCGG 65.310 -999.990 S.. R4 1992 09 23 16 28 00 -14.2500 -170.5700 60.30 42.00 18.30 123611 SMO 1992 09 14 23 35 00 3021-66 T co CCGG 74.270 -999.990 ... R4 1992 10 08 09 39 00 -14.2500 -170.5700 44.00 42.00 2.00 123615 SMO 1992 09 14 23 35 00 3022-66 T co CCGG 71.710 -999.990 ... R4 1992 10 08 09 57 00 -14.2500 -170.5700 44.00 42.00 2.00 123616 SMO 1992 09 14 23 35 00 85-91 P co CCGG 76.010 -999.990 ... R4 1992 10 06 09 36 00 -14.2500 -170.5700 47.00 42.00 5.00 123613 SMO 1992 09 14 23 35 00 86-91 P co CCGG 76.100 -999.990 ... R4 1992 10 06 09 52 00 -14.2500 -170.5700 47.00 42.00 5.00 123614 SMO 1992 09 15 00 10 00 2135-66 S co CCGG 73.290 -999.990 S.. R4 1992 10 09 10 24 00 -14.2500 -170.5700 60.30 42.00 18.30 123617 SMO 1992 09 15 00 10 00 2136-66 S co CCGG 72.200 -999.990 S.. R4 1992 10 09 10 40 00 -14.2500 -170.5700 60.30 42.00 18.30 123618 SMO 1992 09 21 23 25 00 3179-66 T co CCGG 69.090 -999.990 ... R4 1992 10 08 10 14 00 -14.2500 -170.5700 44.00 42.00 2.00 123621 SMO 1992 09 21 23 25 00 3180-66 T co CCGG 71.520 -999.990 ... R4 1992 10 08 10 31 00 -14.2500 -170.5700 44.00 42.00 2.00 123622 SMO 1992 09 21 23 25 00 93-91 P co CCGG 74.580 -999.990 ... R4 1992 10 27 13 13 00 -14.2500 -170.5700 47.00 42.00 5.00 123619 SMO 1992 09 21 23 25 00 94-91 P co CCGG 73.550 -999.990 ... R4 1992 10 27 13 29 00 -14.2500 -170.5700 47.00 42.00 5.00 123620 SMO 1992 09 22 00 15 00 2167-66 S co CCGG 69.150 -999.990 S.. R4 1992 10 09 11 41 00 -14.2500 -170.5700 60.30 42.00 18.30 123623 SMO 1992 09 22 00 15 00 2168-66 S co CCGG 69.670 -999.990 S.. R4 1992 10 09 11 57 00 -14.2500 -170.5700 60.30 42.00 18.30 123624 SMO 1992 09 28 23 30 00 3313-66 T co CCGG 66.630 -999.990 ... R4 1992 11 11 16 01 00 -14.2500 -170.5700 44.00 42.00 2.00 123627 SMO 1992 09 28 23 30 00 3314-66 T co CCGG 66.000 -999.990 ... R4 1992 11 11 16 18 00 -14.2500 -170.5700 44.00 42.00 2.00 123628 SMO 1992 09 28 23 30 00 95-91 P co CCGG 70.340 -999.990 ... R4 1992 10 27 12 26 00 -14.2500 -170.5700 47.00 42.00 5.00 123625 SMO 1992 09 28 23 30 00 96-91 P co CCGG 70.290 -999.990 ... R4 1992 10 27 12 42 00 -14.2500 -170.5700 47.00 42.00 5.00 123626 SMO 1992 09 29 01 10 00 2309-66 S co CCGG 70.270 -999.990 S.. R4 1992 11 10 17 59 00 -14.2500 -170.5700 60.30 42.00 18.30 123629 SMO 1992 09 29 01 10 00 2310-66 S co CCGG 67.340 -999.990 S.. R4 1992 11 10 18 15 00 -14.2500 -170.5700 60.30 42.00 18.30 123630 SMO 1992 10 05 22 49 00 2173-66 S co CCGG 76.350 -999.990 S.. R4 1992 11 10 17 27 00 -14.2500 -170.5700 60.30 42.00 18.30 123631 SMO 1992 10 05 22 49 00 2174-66 S co CCGG 76.270 -999.990 S.. R4 1992 11 10 17 43 00 -14.2500 -170.5700 60.30 42.00 18.30 123632 SMO 1992 10 05 23 40 00 3515-66 T co CCGG 77.270 -999.990 ... R4 1992 11 12 10 37 00 -14.2500 -170.5700 44.00 42.00 2.00 123635 SMO 1992 10 05 23 40 00 3516-66 T co CCGG 76.770 -999.990 ... R4 1992 11 12 10 55 00 -14.2500 -170.5700 44.00 42.00 2.00 123636 SMO 1992 10 05 23 40 00 63-91 P co CCGG 82.320 -999.990 ... R4 1992 11 13 16 25 00 -14.2500 -170.5700 47.00 42.00 5.00 123633 SMO 1992 10 05 23 40 00 64-91 P co CCGG 81.470 -999.990 ... R4 1992 11 13 16 42 00 -14.2500 -170.5700 47.00 42.00 5.00 123634 SMO 1992 10 14 23 24 00 2141-66 S co CCGG 72.600 -999.990 S.. R4 1992 11 10 15 23 00 -14.2500 -170.5700 60.30 42.00 18.30 123637 SMO 1992 10 14 23 24 00 2142-66 S co CCGG 74.480 -999.990 S.. R4 1992 11 10 15 39 00 -14.2500 -170.5700 60.30 42.00 18.30 123638 SMO 1992 10 14 23 45 00 10-91 P co CCGG 73.750 -999.990 P.. R4 1992 11 17 08 43 00 -14.2500 -170.5700 47.00 42.00 5.00 123640 SMO 1992 10 14 23 45 00 3331-66 T co CCGG 72.960 -999.990 P.. R4 1992 11 17 13 54 00 -14.2500 -170.5700 44.00 42.00 2.00 123641 SMO 1992 10 14 23 45 00 3332-66 T co CCGG 77.740 -999.990 P.. R4 1992 11 17 14 11 00 -14.2500 -170.5700 44.00 42.00 2.00 123642 SMO 1992 10 14 23 45 00 9-91 P co CCGG 76.550 -999.990 P.. R4 1992 11 17 08 26 00 -14.2500 -170.5700 47.00 42.00 5.00 123639 SMO 1992 10 19 23 16 00 2253-66 S co CCGG 70.050 -999.990 S.. R4 1992 11 10 18 31 00 -14.2500 -170.5700 60.30 42.00 18.30 123643 SMO 1992 10 19 23 16 00 2254-66 S co CCGG 71.870 -999.990 S.. R4 1992 11 10 18 47 00 -14.2500 -170.5700 60.30 42.00 18.30 123644 SMO 1992 10 19 23 35 00 3485-66 T co CCGG 71.210 -999.990 ... R4 1992 11 17 13 20 00 -14.2500 -170.5700 44.00 42.00 2.00 123647 SMO 1992 10 19 23 35 00 3486-66 T co CCGG 69.990 -999.990 ... R4 1992 11 17 13 37 00 -14.2500 -170.5700 44.00 42.00 2.00 123648 SMO 1992 10 19 23 35 00 81-91 P co CCGG 72.030 -999.990 ... R4 1992 12 02 13 27 00 -14.2500 -170.5700 47.00 42.00 5.00 123645 SMO 1992 10 19 23 35 00 82-91 P co CCGG 71.280 -999.990 ... R4 1992 12 02 13 43 00 -14.2500 -170.5700 47.00 42.00 5.00 123646 SMO 1992 10 28 23 08 00 2087-66 S co CCGG 67.870 -999.990 S.. R4 1992 11 25 12 46 00 -14.2500 -170.5700 60.30 42.00 18.30 123649 SMO 1992 10 28 23 08 00 2088-66 S co CCGG 67.650 -999.990 S.. R4 1992 11 25 13 02 00 -14.2500 -170.5700 60.30 42.00 18.30 123650 SMO 1992 10 28 23 32 00 3257-66 T co CCGG 70.710 -999.990 ... R4 1992 11 19 17 09 00 -14.2500 -170.5700 44.00 42.00 2.00 123653 SMO 1992 10 28 23 32 00 3258-66 T co CCGG 68.970 -999.990 ... R4 1992 11 19 17 26 00 -14.2500 -170.5700 44.00 42.00 2.00 123654 SMO 1992 10 28 23 32 00 65-91 P co CCGG 68.840 -999.990 ... R4 1992 12 02 12 54 00 -14.2500 -170.5700 47.00 42.00 5.00 123651 SMO 1992 10 28 23 32 00 66-91 P co CCGG 69.450 -999.990 ... R4 1992 12 02 13 10 00 -14.2500 -170.5700 47.00 42.00 5.00 123652 SMO 1992 11 03 21 49 00 2043-66 S co CCGG 66.970 -999.990 S.. R4 1992 11 25 12 14 00 -14.2500 -170.5700 60.30 42.00 18.30 123655 SMO 1992 11 03 21 49 00 2044-66 S co CCGG 66.070 -999.990 S.. R4 1992 11 25 12 30 00 -14.2500 -170.5700 60.30 42.00 18.30 123656 SMO 1992 11 03 22 15 00 3357-66 T co CCGG 64.910 -999.990 ... R4 1992 11 19 16 35 00 -14.2500 -170.5700 44.00 42.00 2.00 123659 SMO 1992 11 03 22 15 00 3358-66 T co CCGG -999.990 -999.990 *.. R4 1992 11 19 16 52 00 -14.2500 -170.5700 44.00 42.00 2.00 123660 SMO 1992 11 03 22 15 00 71-91 P co CCGG 67.020 -999.990 ... R4 1992 11 23 10 44 00 -14.2500 -170.5700 47.00 42.00 5.00 123657 SMO 1992 11 03 22 15 00 72-91 P co CCGG -999.990 -999.990 *.. R4 1992 11 23 11 00 00 -14.2500 -170.5700 47.00 42.00 5.00 123658 SMO 1992 11 10 00 47 00 2189-66 S co CCGG 70.430 -999.990 S.. R4 1992 12 09 10 44 00 -14.2500 -170.5700 60.30 42.00 18.30 123661 SMO 1992 11 10 00 47 00 2190-66 S co CCGG 73.310 -999.990 S.. R4 1992 12 09 11 00 00 -14.2500 -170.5700 60.30 42.00 18.30 123662 SMO 1992 11 10 01 45 00 119-91 P co CCGG -999.990 -999.990 *.. R4 1992 11 23 11 17 00 -14.2500 -170.5700 47.00 42.00 5.00 123663 SMO 1992 11 10 01 45 00 3371-66 T co CCGG 78.320 -999.990 P.. R4 1992 12 09 09 27 00 -14.2500 -170.5700 44.00 42.00 2.00 123665 SMO 1992 11 10 01 45 00 3372-66 T co CCGG 70.170 -999.990 P.. R4 1992 12 09 09 45 00 -14.2500 -170.5700 44.00 42.00 2.00 123666 SMO 1992 11 16 23 18 00 2001-66 S co CCGG 66.670 -999.990 S.. R4 1992 12 09 11 50 00 -14.2500 -170.5700 60.30 42.00 18.30 123667 SMO 1992 11 16 23 18 00 2002-66 S co CCGG 67.460 -999.990 S.. R4 1992 12 09 12 06 00 -14.2500 -170.5700 60.30 42.00 18.30 123668 SMO 1992 11 17 01 15 00 3439-66 T co CCGG 65.610 -999.990 ... R4 1992 12 09 10 02 00 -14.2500 -170.5700 44.00 42.00 2.00 123671 SMO 1992 11 17 01 15 00 3440-66 T co CCGG 66.310 -999.990 ... R4 1992 12 09 10 19 00 -14.2500 -170.5700 44.00 42.00 2.00 123672 SMO 1992 11 17 01 15 00 97-91 P co CCGG 65.520 -999.990 ... R4 1992 12 10 08 22 00 -14.2500 -170.5700 47.00 42.00 5.00 123669 SMO 1992 11 17 01 15 00 98-91 P co CCGG 65.460 -999.990 ... R4 1992 12 10 08 39 00 -14.2500 -170.5700 47.00 42.00 5.00 123670 SMO 1992 11 24 23 50 00 121-91 P co CCGG 63.360 -999.990 ... R4 1992 12 10 08 55 00 -14.2500 -170.5700 47.00 42.00 5.00 123673 SMO 1992 11 24 23 50 00 122-91 P co CCGG 62.870 -999.990 ... R4 1992 12 10 09 12 00 -14.2500 -170.5700 47.00 42.00 5.00 123674 SMO 1992 11 24 23 50 00 3021-66 T co CCGG 64.230 -999.990 ... R4 1992 12 18 09 29 00 -14.2500 -170.5700 44.00 42.00 2.00 123675 SMO 1992 11 24 23 50 00 3022-66 T co CCGG 63.830 -999.990 ... R4 1992 12 18 09 46 00 -14.2500 -170.5700 44.00 42.00 2.00 123676 SMO 1992 11 25 00 25 00 2259-66 S co CCGG 63.160 -999.990 S.. R4 1992 12 17 14 03 00 -14.2500 -170.5700 60.30 42.00 18.30 123677 SMO 1992 11 25 00 25 00 2260-66 S co CCGG 63.040 -999.990 S.. R4 1992 12 17 14 19 00 -14.2500 -170.5700 60.30 42.00 18.30 123678 SMO 1992 12 02 00 25 00 2103-66 S co CCGG 64.180 -999.990 S.. R4 1992 12 17 13 31 00 -14.2500 -170.5700 60.30 42.00 18.30 123679 SMO 1992 12 02 00 25 00 2104-66 S co CCGG 64.010 -999.990 S.. R4 1992 12 17 13 47 00 -14.2500 -170.5700 60.30 42.00 18.30 123680 SMO 1992 12 02 01 25 00 173-91 P co CCGG 63.580 -999.990 ... R4 1993 01 15 14 46 00 -14.2500 -170.5700 47.00 42.00 5.00 123681 SMO 1992 12 02 01 25 00 174-91 P co CCGG 63.630 -999.990 ... R4 1993 01 15 15 02 00 -14.2500 -170.5700 47.00 42.00 5.00 123682 SMO 1992 12 07 23 15 00 167-91 P co CCGG 65.700 -999.990 ... R4 1993 01 15 15 19 00 -14.2500 -170.5700 47.00 42.00 5.00 123683 SMO 1992 12 07 23 15 00 168-91 P co CCGG 64.500 -999.990 ... R4 1993 01 15 15 35 00 -14.2500 -170.5700 47.00 42.00 5.00 123684 SMO 1992 12 07 23 46 00 2311-66 S co CCGG 65.430 -999.990 S.. R4 1993 01 08 09 46 00 -14.2500 -170.5700 60.30 42.00 18.30 123685 SMO 1992 12 07 23 46 00 2312-66 S co CCGG 64.560 -999.990 S.. R4 1993 01 08 10 03 00 -14.2500 -170.5700 60.30 42.00 18.30 123686 SMO 1992 12 14 23 15 00 2207-66 S co CCGG 60.800 -999.990 S.. R4 1993 01 08 10 19 00 -14.2500 -170.5700 60.30 42.00 18.30 123687 SMO 1992 12 14 23 15 00 2208-66 S co CCGG 60.090 -999.990 S.. R4 1993 01 08 10 35 00 -14.2500 -170.5700 60.30 42.00 18.30 123688 SMO 1992 12 14 23 35 00 67-91 P co CCGG -999.990 -999.990 *.. R4 1993 01 12 16 16 00 -14.2500 -170.5700 47.00 42.00 5.00 123689 SMO 1992 12 14 23 35 00 68-91 P co CCGG 61.160 -999.990 ... R4 1993 01 12 16 34 00 -14.2500 -170.5700 47.00 42.00 5.00 123690 SMO 1992 12 23 23 21 00 2363-66 S co CCGG -999.990 -999.990 *.. R4 1993 02 05 13 54 00 -14.2500 -170.5700 60.30 42.00 18.30 123691 SMO 1992 12 23 23 21 00 2364-66 S co CCGG 66.310 -999.990 S.. R4 1993 02 05 14 10 00 -14.2500 -170.5700 60.30 42.00 18.30 123692 SMO 1992 12 23 23 48 00 31-91 P co CCGG 63.040 -999.990 ... R4 1993 01 12 15 41 00 -14.2500 -170.5700 47.00 42.00 5.00 123693 SMO 1992 12 23 23 48 00 32-91 P co CCGG 63.790 -999.990 ... R4 1993 01 12 15 58 00 -14.2500 -170.5700 47.00 42.00 5.00 123694 SMO 1992 12 31 22 46 00 2243-66 S co CCGG -999.990 -999.990 *.. R4 1993 02 05 12 43 00 -14.2500 -170.5700 60.30 42.00 18.30 123695 SMO 1992 12 31 22 46 00 2244-66 S co CCGG 55.960 -999.990 S.. R4 1993 02 05 12 59 00 -14.2500 -170.5700 60.30 42.00 18.30 123696 SMO 1992 12 31 23 27 00 101-91 P co CCGG -999.990 -999.990 *.. R4 1993 02 10 20 53 00 -14.2500 -170.5700 47.00 42.00 5.00 123697 SMO 1992 12 31 23 27 00 102-91 P co CCGG -999.990 -999.990 *.. R4 1993 02 10 21 09 00 -14.2500 -170.5700 47.00 42.00 5.00 123698 SMO 1993 01 06 21 21 00 2091-66 S co CCGG -999.990 -999.990 *.. R4 1993 02 05 16 13 00 -14.2500 -170.5700 60.30 42.00 18.30 123699 SMO 1993 01 06 21 21 00 2092-66 S co CCGG -999.990 -999.990 *.. R4 1993 02 05 16 30 00 -14.2500 -170.5700 60.30 42.00 18.30 123700 SMO 1993 01 06 21 46 00 77-91 P co CCGG 55.620 -999.990 ... R4 1993 02 16 09 17 00 -14.2500 -170.5700 47.00 42.00 5.00 123701 SMO 1993 01 06 21 46 00 78-91 P co CCGG 54.910 -999.990 ... R4 1993 02 16 09 33 00 -14.2500 -170.5700 47.00 42.00 5.00 123702 SMO 1993 01 14 00 40 00 2347-66 S co CCGG 56.970 -999.990 S.. R4 1993 02 05 15 41 00 -14.2500 -170.5700 60.30 42.00 18.30 123703 SMO 1993 01 14 00 40 00 2348-66 S co CCGG 58.950 -999.990 S.. R4 1993 02 05 15 57 00 -14.2500 -170.5700 60.30 42.00 18.30 123704 SMO 1993 01 14 01 15 00 7-91 P co CCGG 60.120 -999.990 P.. R4 1993 03 02 09 03 00 -14.2500 -170.5700 47.00 42.00 5.00 123705 SMO 1993 01 14 01 15 00 8-91 P co CCGG 65.540 -999.990 P.. R4 1993 03 02 09 20 00 -14.2500 -170.5700 47.00 42.00 5.00 123706 SMO 1993 01 19 23 28 00 2185-66 S co CCGG 60.050 -999.990 S.. R4 1993 03 04 09 24 00 -14.2500 -170.5700 60.30 42.00 18.30 123707 SMO 1993 01 19 23 28 00 2186-66 S co CCGG 59.600 -999.990 S.. R4 1993 03 04 09 40 00 -14.2500 -170.5700 60.30 42.00 18.30 123708 SMO 1993 01 19 23 48 00 69-91 P co CCGG 56.470 -999.990 P.. R4 1993 03 02 09 36 00 -14.2500 -170.5700 47.00 42.00 5.00 123709 SMO 1993 01 19 23 48 00 70-91 P co CCGG 59.360 -999.990 P.. R4 1993 03 02 09 53 00 -14.2500 -170.5700 47.00 42.00 5.00 123710 SMO 1993 01 26 00 30 00 63-91 P co CCGG 60.650 -999.990 ... R4 1993 03 02 10 09 00 -14.2500 -170.5700 47.00 42.00 5.00 123711 SMO 1993 01 26 00 30 00 64-91 P co CCGG 60.100 -999.990 ... R4 1993 03 02 10 26 00 -14.2500 -170.5700 47.00 42.00 5.00 123712 SMO 1993 01 26 01 25 00 2063-66 S co CCGG 62.100 -999.990 S.. R4 1993 03 04 11 07 00 -14.2500 -170.5700 60.30 42.00 18.30 123713 SMO 1993 01 26 01 25 00 2064-66 S co CCGG 62.360 -999.990 S.. R4 1993 03 04 11 23 00 -14.2500 -170.5700 60.30 42.00 18.30 123714 SMO 1993 02 04 00 41 00 2323-66 S co CCGG 73.830 -999.990 S.. R4 1993 02 25 09 54 00 -14.2500 -170.5700 60.30 42.00 18.30 123715 SMO 1993 02 04 00 41 00 2324-66 S co CCGG 72.960 -999.990 S.. R4 1993 02 25 10 10 00 -14.2500 -170.5700 60.30 42.00 18.30 123716 SMO 1993 02 04 01 15 00 71-91 P co CCGG 71.410 -999.990 ... R4 1993 03 02 08 31 00 -14.2500 -170.5700 47.00 42.00 5.00 123717 SMO 1993 02 04 01 15 00 72-91 P co CCGG 71.030 -999.990 ... R4 1993 03 02 08 47 00 -14.2500 -170.5700 47.00 42.00 5.00 123718 SMO 1993 02 09 23 43 00 2035-66 S co CCGG 53.530 -999.990 S.. R4 1993 02 25 10 26 00 -14.2500 -170.5700 60.30 42.00 18.30 123719 SMO 1993 02 09 23 43 00 2036-66 S co CCGG 54.010 -999.990 S.. R4 1993 02 25 10 43 00 -14.2500 -170.5700 60.30 42.00 18.30 123720 SMO 1993 02 09 23 55 00 281-91 P co CCGG 53.410 -999.990 ... R4 1993 03 02 20 03 00 -14.2500 -170.5700 47.00 42.00 5.00 123721 SMO 1993 02 09 23 55 00 282-91 P co CCGG 52.940 -999.990 ... R4 1993 03 02 20 20 00 -14.2500 -170.5700 47.00 42.00 5.00 123722 SMO 1993 02 19 23 09 00 2253-66 S co CCGG 69.110 -999.990 S.. R4 1993 03 12 09 06 00 -14.2500 -170.5700 60.30 42.00 18.30 123723 SMO 1993 02 19 23 09 00 2254-66 S co CCGG 70.820 -999.990 S.. R4 1993 03 12 09 22 00 -14.2500 -170.5700 60.30 42.00 18.30 123724 SMO 1993 02 19 23 40 00 273-91 P co CCGG 73.650 -999.990 ... R4 1993 03 02 19 30 00 -14.2500 -170.5700 47.00 42.00 5.00 123725 SMO 1993 02 19 23 40 00 274-91 P co CCGG 72.980 -999.990 ... R4 1993 03 02 19 47 00 -14.2500 -170.5700 47.00 42.00 5.00 123726 SMO 1993 02 25 00 26 00 2167-66 S co CCGG 48.150 -999.990 S.. R4 1993 03 12 09 39 00 -14.2500 -170.5700 60.30 42.00 18.30 123727 SMO 1993 02 25 00 26 00 2168-66 S co CCGG 47.740 -999.990 S.. R4 1993 03 12 09 55 00 -14.2500 -170.5700 60.30 42.00 18.30 123728 SMO 1993 02 25 00 50 00 295-91 P co CCGG 49.120 -999.990 ... R4 1993 03 08 08 45 00 -14.2500 -170.5700 47.00 42.00 5.00 123729 SMO 1993 02 25 00 50 00 296-91 P co CCGG 48.290 -999.990 ... R4 1993 03 08 09 01 00 -14.2500 -170.5700 47.00 42.00 5.00 123730 SMO 1993 03 04 01 05 00 155-91 P co CCGG 68.570 -999.990 ... R4 1993 03 18 10 58 00 -14.2500 -170.5700 47.00 42.00 5.00 123731 SMO 1993 03 04 01 05 00 156-91 P co CCGG 68.210 -999.990 ... R4 1993 03 18 11 14 00 -14.2500 -170.5700 47.00 42.00 5.00 123732 SMO 1993 03 04 02 05 00 2043-66 S co CCGG 69.200 -999.990 S.. R4 1993 03 29 13 55 00 -14.2500 -170.5700 60.30 42.00 18.30 123733 SMO 1993 03 04 02 05 00 2044-66 S co CCGG 68.520 -999.990 S.. R4 1993 03 29 14 11 00 -14.2500 -170.5700 60.30 42.00 18.30 123734 SMO 1993 03 09 00 33 00 2087-66 S co CCGG 54.330 -999.990 S.. R4 1993 03 29 14 27 00 -14.2500 -170.5700 60.30 42.00 18.30 123735 SMO 1993 03 09 00 33 00 2088-66 S co CCGG 55.270 -999.990 S.. R4 1993 03 29 14 43 00 -14.2500 -170.5700 60.30 42.00 18.30 123736 SMO 1993 03 09 01 05 00 65-91 P co CCGG 56.230 -999.990 ... R4 1993 03 18 12 23 00 -14.2500 -170.5700 47.00 42.00 5.00 123737 SMO 1993 03 09 01 05 00 66-91 P co CCGG 56.400 -999.990 ... R4 1993 03 18 12 40 00 -14.2500 -170.5700 47.00 42.00 5.00 123738 SMO 1993 03 16 01 47 00 2021-66 S co CCGG 59.190 -999.990 S.. R4 1993 03 31 09 26 00 -14.2500 -170.5700 60.30 42.00 18.30 123739 SMO 1993 03 16 01 47 00 2022-66 S co CCGG 58.380 -999.990 S.. R4 1993 03 31 09 42 00 -14.2500 -170.5700 60.30 42.00 18.30 123740 SMO 1993 03 16 02 00 00 167-91 P co CCGG 59.920 -999.990 ... R4 1993 04 01 15 55 00 -14.2500 -170.5700 47.00 42.00 5.00 123741 SMO 1993 03 16 02 00 00 168-91 P co CCGG 58.080 -999.990 ... R4 1993 04 01 16 12 00 -14.2500 -170.5700 47.00 42.00 5.00 123742 SMO 1993 03 25 00 48 00 2237-66 S co CCGG 57.670 -999.990 S.. R4 1993 03 31 08 54 00 -14.2500 -170.5700 60.30 42.00 18.30 123743 SMO 1993 03 25 00 48 00 2238-66 S co CCGG 55.800 -999.990 S.. R4 1993 03 31 09 10 00 -14.2500 -170.5700 60.30 42.00 18.30 123744 SMO 1993 03 25 01 30 00 283-91 P co CCGG 57.800 -999.990 ... R4 1993 04 01 15 22 00 -14.2500 -170.5700 47.00 42.00 5.00 123745 SMO 1993 03 25 01 30 00 284-91 P co CCGG 57.790 -999.990 ... R4 1993 04 01 15 39 00 -14.2500 -170.5700 47.00 42.00 5.00 123746 SMO 1993 03 31 01 10 00 2231-66 S co CCGG -999.990 -999.990 *.. R4 1993 04 23 15 57 00 -14.2500 -170.5700 60.30 42.00 18.30 123747 SMO 1993 03 31 01 10 00 2232-66 S co CCGG 55.920 -999.990 S.. R4 1993 04 23 16 13 00 -14.2500 -170.5700 60.30 42.00 18.30 123748 SMO 1993 03 31 01 45 00 345-91 P co CCGG 53.180 -999.990 ... R4 1993 04 21 13 24 00 -14.2500 -170.5700 47.00 42.00 5.00 123749 SMO 1993 03 31 01 45 00 346-91 P co CCGG 53.040 -999.990 ... R4 1993 04 21 13 40 00 -14.2500 -170.5700 47.00 42.00 5.00 123750 SMO 1993 04 06 00 42 00 2183-66 S co CCGG 60.430 -999.990 S.. R4 1993 04 26 10 29 00 -14.2500 -170.5700 60.30 42.00 18.30 123751 SMO 1993 04 06 00 42 00 2184-66 S co CCGG 64.000 -999.990 S.. R4 1993 04 26 10 46 00 -14.2500 -170.5700 60.30 42.00 18.30 123752 SMO 1993 04 06 01 10 00 353-91 P co CCGG 61.670 -999.990 ... R4 1993 04 21 12 45 00 -14.2500 -170.5700 47.00 42.00 5.00 123753 SMO 1993 04 06 01 10 00 354-91 P co CCGG 59.280 -999.990 ... R4 1993 04 21 13 01 00 -14.2500 -170.5700 47.00 42.00 5.00 123754 SMO 1993 04 15 22 40 00 2311-66 S co CCGG 62.040 -999.990 S.. R4 1993 05 11 10 25 00 -14.2500 -170.5700 60.30 42.00 18.30 123755 SMO 1993 04 15 22 40 00 2312-66 S co CCGG 60.500 -999.990 S.. R4 1993 05 11 10 42 00 -14.2500 -170.5700 60.30 42.00 18.30 123756 SMO 1993 04 15 23 10 00 347-91 P co CCGG 59.840 -999.990 ... R4 1993 04 30 14 44 00 -14.2500 -170.5700 47.00 42.00 5.00 123757 SMO 1993 04 15 23 10 00 348-91 P co CCGG 60.720 -999.990 ... R4 1993 04 30 15 01 00 -14.2500 -170.5700 47.00 42.00 5.00 123758 SMO 1993 04 20 22 45 00 2339-66 S co CCGG 58.390 -999.990 S.. R4 1993 05 11 09 53 00 -14.2500 -170.5700 60.30 42.00 18.30 123759 SMO 1993 04 20 22 45 00 2340-66 S co CCGG 58.080 -999.990 S.. R4 1993 05 11 10 09 00 -14.2500 -170.5700 60.30 42.00 18.30 123760 SMO 1993 04 20 23 08 00 351-91 P co CCGG 58.590 -999.990 ... R4 1993 04 30 15 17 00 -14.2500 -170.5700 47.00 42.00 5.00 123761 SMO 1993 04 20 23 08 00 352-91 P co CCGG 58.810 -999.990 ... R4 1993 04 30 15 34 00 -14.2500 -170.5700 47.00 42.00 5.00 123762 SMO 1993 04 28 00 18 00 2125-66 S co CCGG -999.990 -999.990 *.. R4 1993 05 24 14 26 00 -14.2500 -170.5700 60.30 42.00 18.30 123763 SMO 1993 04 28 00 18 00 2126-66 S co CCGG -999.990 -999.990 *.. R4 1993 05 24 14 42 00 -14.2500 -170.5700 60.30 42.00 18.30 123764 SMO 1993 04 28 00 55 00 337-91 P co CCGG 55.090 -999.990 ... R4 1993 05 18 13 15 00 -14.2500 -170.5700 47.00 42.00 5.00 123765 SMO 1993 05 05 00 15 00 2061-66 S co CCGG -999.990 -999.990 *.. R4 1993 05 24 14 58 00 -14.2500 -170.5700 60.30 42.00 18.30 123766 SMO 1993 05 05 00 15 00 2062-66 S co CCGG -999.990 -999.990 *.. R4 1993 05 24 15 14 00 -14.2500 -170.5700 60.30 42.00 18.30 123767 SMO 1993 05 05 00 45 00 339-91 P co CCGG 53.130 -999.990 ... R4 1993 05 18 14 22 00 -14.2500 -170.5700 47.00 42.00 5.00 123768 SMO 1993 05 05 00 45 00 340-91 P co CCGG 54.360 -999.990 ... R4 1993 05 18 14 38 00 -14.2500 -170.5700 47.00 42.00 5.00 123769 SMO 1993 05 10 23 30 00 335-91 P co CCGG 57.680 -999.990 ... R4 1993 06 02 11 49 00 -14.2500 -170.5700 47.00 42.00 5.00 123770 SMO 1993 05 10 23 30 00 336-91 P co CCGG 57.800 -999.990 ... R4 1993 06 02 12 05 00 -14.2500 -170.5700 47.00 42.00 5.00 123771 SMO 1993 05 17 22 15 00 332-91 P co CCGG 57.360 -999.990 ... R4 1993 06 11 15 13 00 -14.2500 -170.5700 47.00 42.00 5.00 123777 SMO 1993 05 24 12 34 56 341-91 P co CCGG 55.980 -999.990 ... R4 1993 06 11 14 08 00 -14.2500 -170.5700 47.00 42.00 5.00 123780 SMO 1993 05 24 12 34 56 342-91 P co CCGG 56.920 -999.990 ... R4 1993 06 11 14 24 00 -14.2500 -170.5700 47.00 42.00 5.00 123781 SMO 1993 05 31 20 50 00 69-91 P co CCGG 56.230 -999.990 P.. R4 1993 06 22 15 11 00 -14.2500 -170.5700 47.00 42.00 5.00 123784 SMO 1993 05 31 20 50 00 70-91 P co CCGG 60.140 -999.990 P.. R4 1993 06 22 15 28 00 -14.2500 -170.5700 47.00 42.00 5.00 123785 SMO 1993 06 07 12 34 56 64-91 P co CCGG 56.440 -999.990 ... R4 1993 06 22 14 55 00 -14.2500 -170.5700 47.00 42.00 5.00 123787 SMO 1993 06 07 19 27 00 2038-66 S co CCGG 57.450 -999.990 S.. R4 1993 06 25 14 42 00 -14.2500 -170.5700 60.30 42.00 18.30 123786 SMO 1993 06 16 21 49 00 2317-66 S co CCGG 59.180 -999.990 S.. R4 1993 06 25 11 29 00 -14.2500 -170.5700 60.30 42.00 18.30 123788 SMO 1993 06 16 21 49 00 2318-66 S co CCGG 59.710 -999.990 S.. R4 1993 06 25 11 45 00 -14.2500 -170.5700 60.30 42.00 18.30 123789 SMO 1993 06 16 22 05 00 55-91 P co CCGG 55.930 -999.990 ... R4 1993 06 30 15 08 00 -14.2500 -170.5700 47.00 42.00 5.00 123790 SMO 1993 06 16 22 05 00 56-91 P co CCGG 55.810 -999.990 ... R4 1993 06 30 15 25 00 -14.2500 -170.5700 47.00 42.00 5.00 123791 SMO 1993 06 21 22 08 00 2001-66 S co CCGG 57.650 -999.990 S.. R4 1993 07 26 11 54 00 -14.2500 -170.5700 60.30 42.00 18.30 123792 SMO 1993 06 21 22 08 00 2002-66 S co CCGG 59.440 -999.990 S.. R4 1993 07 26 12 10 00 -14.2500 -170.5700 60.30 42.00 18.30 123793 SMO 1993 06 21 23 25 00 71-91 P co CCGG 54.990 -999.990 ... R4 1993 06 30 14 36 00 -14.2500 -170.5700 47.00 42.00 5.00 123794 SMO 1993 06 21 23 25 00 72-91 P co CCGG 58.030 -999.990 ... R4 1993 06 30 14 52 00 -14.2500 -170.5700 47.00 42.00 5.00 123795 SMO 1993 06 28 20 00 00 2151-66 S co CCGG 60.000 -999.990 S.. R4 1993 07 26 11 22 00 -14.2500 -170.5700 60.30 42.00 18.30 123796 SMO 1993 06 28 20 00 00 2152-66 S co CCGG 60.110 -999.990 S.. R4 1993 07 26 11 38 00 -14.2500 -170.5700 60.30 42.00 18.30 123797 SMO 1993 06 28 21 15 00 367-91 P co CCGG 59.580 -999.990 ... R4 1993 07 13 16 00 00 -14.2500 -170.5700 47.00 42.00 5.00 123798 SMO 1993 06 28 21 15 00 368-91 P co CCGG 60.130 -999.990 ... R4 1993 07 13 16 17 00 -14.2500 -170.5700 47.00 42.00 5.00 123799 SMO 1993 07 05 20 00 00 2223-66 S co CCGG 61.530 -999.990 S.. R4 1993 08 03 15 11 00 -14.2500 -170.5700 60.30 42.00 18.30 123800 SMO 1993 07 05 20 00 00 2224-66 S co CCGG 61.050 -999.990 S.. R4 1993 08 03 15 27 00 -14.2500 -170.5700 60.30 42.00 18.30 123801 SMO 1993 07 05 20 35 00 369-91 P co CCGG 61.320 -999.990 ... R4 1993 07 13 15 27 00 -14.2500 -170.5700 47.00 42.00 5.00 123802 SMO 1993 07 05 20 35 00 370-91 P co CCGG 61.090 -999.990 ... R4 1993 07 13 15 44 00 -14.2500 -170.5700 47.00 42.00 5.00 123803 SMO 1993 07 13 18 24 00 2309-66 S co CCGG 58.640 -999.990 S.. R4 1993 08 03 15 43 00 -14.2500 -170.5700 60.30 42.00 18.30 123804 SMO 1993 07 13 18 24 00 2310-66 S co CCGG 60.250 -999.990 S.. R4 1993 08 03 15 59 00 -14.2500 -170.5700 60.30 42.00 18.30 123805 SMO 1993 07 13 19 15 00 383-91 P co CCGG 59.380 -999.990 ... R4 1993 08 04 11 45 00 -14.2500 -170.5700 47.00 42.00 5.00 123806 SMO 1993 07 13 19 15 00 384-91 P co CCGG 59.600 -999.990 ... R4 1993 08 04 12 01 00 -14.2500 -170.5700 47.00 42.00 5.00 123807 SMO 1993 07 20 20 15 00 387-91 P co CCGG 58.620 -999.990 ... R4 1993 08 05 13 31 00 -14.2500 -170.5700 47.00 42.00 5.00 123808 SMO 1993 07 20 20 15 00 388-91 P co CCGG 59.300 -999.990 ... R4 1993 08 05 13 48 00 -14.2500 -170.5700 47.00 42.00 5.00 123809 SMO 1993 07 20 21 26 00 2369-66 S co CCGG 61.330 -999.990 S.. R4 1993 08 11 09 21 00 -14.2500 -170.5700 60.30 42.00 18.30 123810 SMO 1993 07 20 21 26 00 2370-66 S co CCGG 61.970 -999.990 S.. R4 1993 08 11 09 37 00 -14.2500 -170.5700 60.30 42.00 18.30 123811 SMO 1993 07 27 22 15 00 375-91 P co CCGG 64.210 -999.990 ... R4 1993 08 12 14 31 00 -14.2500 -170.5700 47.00 42.00 5.00 123812 SMO 1993 07 27 22 15 00 376-91 P co CCGG 63.890 -999.990 ... R4 1993 08 12 14 47 00 -14.2500 -170.5700 47.00 42.00 5.00 123813 SMO 1993 07 27 23 35 00 2185-66 S co CCGG 63.280 -999.990 S.. R4 1993 08 11 08 48 00 -14.2500 -170.5700 60.30 42.00 18.30 123814 SMO 1993 07 27 23 35 00 2186-66 S co CCGG 63.210 -999.990 S.. R4 1993 08 11 09 04 00 -14.2500 -170.5700 60.30 42.00 18.30 123815 SMO 1993 08 02 22 30 00 373-91 P co CCGG 60.640 -999.990 ... R4 1993 08 12 13 58 00 -14.2500 -170.5700 47.00 42.00 5.00 123816 SMO 1993 08 02 22 30 00 374-91 P co CCGG 60.780 -999.990 ... R4 1993 08 12 14 14 00 -14.2500 -170.5700 47.00 42.00 5.00 123817 SMO 1993 08 02 23 20 00 2043-66 S co CCGG 59.960 -999.990 S.. R4 1993 08 18 10 04 00 -14.2500 -170.5700 60.30 42.00 18.30 123818 SMO 1993 08 02 23 20 00 2044-66 S co CCGG 58.860 -999.990 S.. R4 1993 08 18 10 20 00 -14.2500 -170.5700 60.30 42.00 18.30 123819 SMO 1993 08 09 23 15 00 2255-66 S co CCGG 58.730 -999.990 S.. R4 1993 08 18 09 32 00 -14.2500 -170.5700 60.30 42.00 18.30 123820 SMO 1993 08 09 23 15 00 2256-66 S co CCGG 59.100 -999.990 S.. R4 1993 08 18 09 48 00 -14.2500 -170.5700 60.30 42.00 18.30 123821 SMO 1993 08 09 23 45 00 339-91 P co CCGG 58.280 -999.990 ... R4 1993 08 26 09 51 00 -14.2500 -170.5700 47.00 42.00 5.00 123822 SMO 1993 08 09 23 45 00 340-91 P co CCGG 58.910 -999.990 ... R4 1993 08 26 10 07 00 -14.2500 -170.5700 47.00 42.00 5.00 123823 SMO 1993 08 13 22 15 00 2333-66 S co CCGG 59.870 -999.990 S.. R4 1993 09 08 13 12 00 -14.2500 -170.5700 60.30 42.00 18.30 123824 SMO 1993 08 13 22 15 00 2334-66 S co CCGG 57.730 -999.990 S.. R4 1993 09 08 13 28 00 -14.2500 -170.5700 60.30 42.00 18.30 123825 SMO 1993 08 13 22 50 00 289-91 P co CCGG 57.520 -999.990 ... R4 1993 08 26 10 24 00 -14.2500 -170.5700 47.00 42.00 5.00 123826 SMO 1993 08 13 22 50 00 290-91 P co CCGG 57.800 -999.990 ... R4 1993 08 26 10 40 00 -14.2500 -170.5700 47.00 42.00 5.00 123827 SMO 1993 08 25 02 20 00 2221-66 S co CCGG 65.670 -999.990 S.. R4 1993 09 20 14 49 00 -14.2500 -170.5700 60.30 42.00 18.30 123828 SMO 1993 08 25 02 20 00 2222-66 S co CCGG 65.540 -999.990 S.. R4 1993 09 20 15 05 00 -14.2500 -170.5700 60.30 42.00 18.30 123829 SMO 1993 08 25 02 40 00 273-91 P co CCGG 66.030 -999.990 ... R4 1993 09 30 12 56 00 -14.2500 -170.5700 47.00 42.00 5.00 123830 SMO 1993 08 25 02 40 00 274-91 P co CCGG 65.590 -999.990 ... R4 1993 09 30 13 12 00 -14.2500 -170.5700 47.00 42.00 5.00 123831 SMO 1993 08 30 23 20 00 2073-66 S co CCGG 76.000 -999.990 S.. R4 1993 09 20 15 22 00 -14.2500 -170.5700 60.30 42.00 18.30 123832 SMO 1993 08 31 00 50 00 5-91 P co CCGG 75.020 -999.990 ... R4 1993 09 30 13 29 00 -14.2500 -170.5700 47.00 42.00 5.00 123834 SMO 1993 08 31 00 50 00 6-91 P co CCGG 75.370 -999.990 ... R4 1993 09 30 13 45 00 -14.2500 -170.5700 47.00 42.00 5.00 123835 SMO 1993 09 07 21 05 00 2207-66 S co CCGG 64.010 -999.990 S.. R4 1993 09 21 12 12 00 -14.2500 -170.5700 60.30 42.00 18.30 123836 SMO 1993 09 07 21 05 00 2208-66 S co CCGG 63.360 -999.990 S.. R4 1993 09 21 12 29 00 -14.2500 -170.5700 60.30 42.00 18.30 123837 SMO 1993 09 07 21 45 00 65-91 P co CCGG 63.470 -999.990 ... R4 1993 09 23 11 12 00 -14.2500 -170.5700 47.00 42.00 5.00 123838 SMO 1993 09 07 21 45 00 66-91 P co CCGG 63.040 -999.990 ... R4 1993 09 23 11 29 00 -14.2500 -170.5700 47.00 42.00 5.00 123839 SMO 1993 09 15 00 30 00 2189-66 S co CCGG 70.890 -999.990 S.. R4 1993 10 20 09 51 00 -14.2500 -170.5700 60.30 42.00 18.30 123840 SMO 1993 09 15 00 30 00 2190-66 S co CCGG 76.270 -999.990 S.. R4 1993 10 20 10 08 00 -14.2500 -170.5700 60.30 42.00 18.30 123841 SMO 1993 09 15 01 00 00 335-91 P co CCGG 64.500 -999.990 ... R4 1993 09 23 11 45 00 -14.2500 -170.5700 47.00 42.00 5.00 123842 SMO 1993 09 15 01 00 00 336-91 P co CCGG 64.930 -999.990 ... R4 1993 09 23 12 02 00 -14.2500 -170.5700 47.00 42.00 5.00 123843 SMO 1993 09 24 22 15 00 2103-66 S co CCGG 68.520 -999.990 S.. R4 1993 10 20 08 46 00 -14.2500 -170.5700 60.30 42.00 18.30 123844 SMO 1993 09 24 22 15 00 2104-66 S co CCGG 68.810 -999.990 S.. R4 1993 10 20 09 02 00 -14.2500 -170.5700 60.30 42.00 18.30 123845 SMO 1993 09 24 23 30 00 293-91 P co CCGG 66.490 -999.990 ... R4 1993 10 15 09 10 00 -14.2500 -170.5700 47.00 42.00 5.00 123846 SMO 1993 09 24 23 30 00 294-91 P co CCGG 65.730 -999.990 ... R4 1993 10 15 09 27 00 -14.2500 -170.5700 47.00 42.00 5.00 123847 SMO 1993 09 29 22 40 00 2225-66 S co CCGG 76.570 -999.990 S.. R4 1993 10 20 11 37 00 -14.2500 -170.5700 60.30 42.00 18.30 123848 SMO 1993 09 29 22 40 00 2226-66 S co CCGG 88.130 -999.990 S.. R4 1993 10 20 11 53 00 -14.2500 -170.5700 60.30 42.00 18.30 123849 SMO 1993 09 29 23 25 00 100-91 P co CCGG 70.770 -999.990 ... R4 1993 10 15 08 54 00 -14.2500 -170.5700 47.00 42.00 5.00 123851 SMO 1993 09 29 23 25 00 99-91 P co CCGG 70.970 -999.990 ... R4 1993 10 15 08 38 00 -14.2500 -170.5700 47.00 42.00 5.00 123850 SMO 1993 10 04 22 45 00 2317-66 S co CCGG 79.320 -999.990 S.. R4 1993 10 20 12 09 00 -14.2500 -170.5700 60.30 42.00 18.30 123852 SMO 1993 10 04 22 45 00 2318-66 S co CCGG 79.380 -999.990 S.. R4 1993 10 20 12 25 00 -14.2500 -170.5700 60.30 42.00 18.30 123853 SMO 1993 10 04 23 25 00 361-91 P co CCGG 75.290 -999.990 ... R4 1993 10 26 16 10 00 -14.2500 -170.5700 47.00 42.00 5.00 123854 SMO 1993 10 04 23 25 00 362-91 P co CCGG 74.860 -999.990 ... R4 1993 10 26 16 27 00 -14.2500 -170.5700 47.00 42.00 5.00 123855 SMO 1993 10 13 00 10 00 2259-66 S co CCGG 78.010 -999.990 S.. R4 1993 11 10 08 34 00 -14.2500 -170.5700 60.30 42.00 18.30 123856 SMO 1993 10 13 00 10 00 2260-66 S co CCGG 79.960 -999.990 S.. R4 1993 11 10 08 50 00 -14.2500 -170.5700 60.30 42.00 18.30 123857 SMO 1993 10 13 02 00 00 297-91 P co CCGG 80.220 -999.990 ... R4 1993 10 25 09 43 00 -14.2500 -170.5700 47.00 42.00 5.00 123858 SMO 1993 10 13 02 00 00 298-91 P co CCGG 79.850 -999.990 ... R4 1993 10 25 09 59 00 -14.2500 -170.5700 47.00 42.00 5.00 123859 SMO 1993 10 19 00 30 00 2061-66 S co CCGG 76.020 -999.990 S.. R4 1993 11 09 15 47 00 -14.2500 -170.5700 60.30 42.00 18.30 123860 SMO 1993 10 19 00 30 00 2062-66 S co CCGG 76.520 -999.990 S.. R4 1993 11 09 16 03 00 -14.2500 -170.5700 60.30 42.00 18.30 123861 SMO 1993 10 19 02 40 00 25-91 P co CCGG 76.980 -999.990 ... R4 1993 11 03 10 52 00 -14.2500 -170.5700 47.00 42.00 5.00 123862 SMO 1993 10 19 02 40 00 26-91 P co CCGG 76.610 -999.990 ... R4 1993 11 03 11 08 00 -14.2500 -170.5700 47.00 42.00 5.00 123863 SMO 1993 10 26 01 25 00 41-91 P co CCGG 73.200 -999.990 ... R4 1993 11 03 11 25 00 -14.2500 -170.5700 47.00 42.00 5.00 123864 SMO 1993 10 26 01 25 00 42-91 P co CCGG 73.790 -999.990 ... R4 1993 11 03 11 41 00 -14.2500 -170.5700 47.00 42.00 5.00 123865 SMO 1993 10 26 01 49 00 2223-66 S co CCGG 72.930 -999.990 S.. R4 1993 11 10 09 38 00 -14.2500 -170.5700 60.30 42.00 18.30 123866 SMO 1993 10 26 01 49 00 2224-66 S co CCGG 73.810 -999.990 S.. R4 1993 11 10 09 54 00 -14.2500 -170.5700 60.30 42.00 18.30 123867 SMO 1993 11 02 23 22 00 2159-66 S co CCGG 67.110 -999.990 S.. R4 1993 11 10 09 06 00 -14.2500 -170.5700 60.30 42.00 18.30 123868 SMO 1993 11 02 23 22 00 2160-66 S co CCGG 67.650 -999.990 S.. R4 1993 11 10 09 22 00 -14.2500 -170.5700 60.30 42.00 18.30 123869 SMO 1993 11 02 23 55 00 299-91 P co CCGG 69.860 -999.990 ... R4 1993 11 24 13 10 00 -14.2500 -170.5700 47.00 42.00 5.00 123870 SMO 1993 11 02 23 55 00 300-91 P co CCGG 69.400 -999.990 ... R4 1993 11 24 13 26 00 -14.2500 -170.5700 47.00 42.00 5.00 123871 SMO 1993 11 09 22 25 00 2135-66 S co CCGG 69.430 -999.990 S.. R4 1993 12 01 13 32 00 -14.2500 -170.5700 60.30 42.00 18.30 123872 SMO 1993 11 09 22 25 00 2136-66 S co CCGG 70.430 -999.990 S.. R4 1993 12 01 13 49 00 -14.2500 -170.5700 60.30 42.00 18.30 123873 SMO 1993 11 09 23 40 00 439-91 P co CCGG 71.720 -999.990 ... R4 1993 11 24 14 14 00 -14.2500 -170.5700 47.00 42.00 5.00 123874 SMO 1993 11 09 23 40 00 440-91 P co CCGG 71.080 -999.990 ... R4 1993 11 24 14 31 00 -14.2500 -170.5700 47.00 42.00 5.00 123875 SMO 1993 11 18 22 05 00 2313-66 S co CCGG 64.360 -999.990 S.. R4 1993 12 01 14 05 00 -14.2500 -170.5700 60.30 42.00 18.30 123876 SMO 1993 11 18 22 05 00 2314-66 S co CCGG 63.060 -999.990 S.. R4 1993 12 01 14 22 00 -14.2500 -170.5700 60.30 42.00 18.30 123877 SMO 1993 11 18 23 30 00 309-91 P co CCGG 67.810 -999.990 P.. R4 1993 12 03 08 31 00 -14.2500 -170.5700 47.00 42.00 5.00 123878 SMO 1993 11 18 23 30 00 310-91 P co CCGG 72.390 -999.990 P.. R4 1993 12 03 08 48 00 -14.2500 -170.5700 47.00 42.00 5.00 123879 SMO 1993 11 23 23 25 00 329-91 P co CCGG 63.620 -999.990 ... R4 1993 12 03 09 04 00 -14.2500 -170.5700 47.00 42.00 5.00 123882 SMO 1993 11 23 23 25 00 330-91 P co CCGG 65.520 -999.990 ... R4 1993 12 03 09 23 00 -14.2500 -170.5700 47.00 42.00 5.00 123883 SMO 1993 11 30 23 56 00 273-91 P co CCGG 63.040 -999.990 ... R4 1993 12 27 11 59 00 -14.2500 -170.5700 47.00 42.00 5.00 123886 SMO 1993 11 30 23 56 00 274-91 P co CCGG 62.910 -999.990 ... R4 1993 12 27 12 16 00 -14.2500 -170.5700 47.00 42.00 5.00 123887 SMO 1993 12 09 03 26 00 5-91 P co CCGG 60.300 -999.990 ... R4 1993 12 27 12 32 00 -14.2500 -170.5700 47.00 42.00 5.00 123890 SMO 1993 12 09 03 26 00 6-91 P co CCGG 59.450 -999.990 ... R4 1993 12 27 12 48 00 -14.2500 -170.5700 47.00 42.00 5.00 123891 SMO 1993 12 15 02 00 00 365-91 P co CCGG 65.960 -999.990 ... R4 1994 01 05 15 01 00 -14.2500 -170.5700 47.00 42.00 5.00 123894 SMO 1993 12 15 02 00 00 366-91 P co CCGG 65.610 -999.990 ... R4 1994 01 05 15 17 00 -14.2500 -170.5700 47.00 42.00 5.00 123895 SMO 1993 12 21 01 35 00 333-91 P co CCGG 57.090 -999.990 ... R4 1994 01 05 12 43 00 -14.2500 -170.5700 47.00 42.00 5.00 123898 SMO 1993 12 21 01 35 00 334-91 P co CCGG 56.470 -999.990 ... R4 1994 01 05 12 59 00 -14.2500 -170.5700 47.00 42.00 5.00 123899 SMO 1993 12 28 02 15 00 377-91 P co CCGG 64.660 -999.990 ... R4 1994 01 27 13 09 00 -14.2500 -170.5700 47.00 42.00 5.00 123902 SMO 1993 12 28 02 15 00 378-91 P co CCGG 64.340 -999.990 ... R4 1994 01 27 13 25 00 -14.2500 -170.5700 47.00 42.00 5.00 123903 SMO 1994 01 05 00 04 00 2231-66 S co CCGG 64.510 -999.990 S.. R4 1994 01 25 10 48 00 -14.2500 -170.5700 60.30 42.00 18.30 123904 SMO 1994 01 05 00 04 00 2232-66 S co CCGG 66.990 -999.990 S.. R4 1994 01 25 11 04 00 -14.2500 -170.5700 60.30 42.00 18.30 123905 SMO 1994 01 05 00 45 00 381-91 P co CCGG 65.730 -999.990 ... R4 1994 01 27 12 36 00 -14.2500 -170.5700 47.00 42.00 5.00 123906 SMO 1994 01 05 00 45 00 382-91 P co CCGG 66.550 -999.990 ... R4 1994 01 27 12 52 00 -14.2500 -170.5700 47.00 42.00 5.00 123907 SMO 1994 01 12 01 30 00 2125-66 S co CCGG 53.810 -999.990 S.. R4 1994 01 25 10 15 00 -14.2500 -170.5700 60.30 42.00 18.30 123908 SMO 1994 01 12 01 30 00 2126-66 S co CCGG 54.100 -999.990 S.. R4 1994 01 25 10 31 00 -14.2500 -170.5700 60.30 42.00 18.30 123909 SMO 1994 01 12 02 10 00 345-91 P co CCGG 54.720 -999.990 ... R4 1994 02 01 11 46 00 -14.2500 -170.5700 47.00 42.00 5.00 123910 SMO 1994 01 12 02 10 00 346-91 P co CCGG 54.530 -999.990 ... R4 1994 02 01 12 03 00 -14.2500 -170.5700 47.00 42.00 5.00 123911 SMO 1994 01 19 22 44 00 2309-66 S co CCGG 54.220 -999.990 S.. R4 1994 02 02 09 16 00 -14.2500 -170.5700 60.30 42.00 18.30 123912 SMO 1994 01 19 22 44 00 2310-66 S co CCGG 55.170 -999.990 S.. R4 1994 02 02 09 32 00 -14.2500 -170.5700 60.30 42.00 18.30 123913 SMO 1994 01 20 01 50 00 325-91 P co CCGG 54.900 -999.990 ... R4 1994 02 01 12 19 00 -14.2500 -170.5700 47.00 42.00 5.00 123914 SMO 1994 01 20 01 50 00 326-91 P co CCGG 55.260 -999.990 ... R4 1994 02 01 12 36 00 -14.2500 -170.5700 47.00 42.00 5.00 123915 SMO 1994 01 24 22 15 00 2267-66 S co CCGG 68.190 -999.990 S.. R4 1994 02 02 08 11 00 -14.2500 -170.5700 60.30 42.00 18.30 123916 SMO 1994 01 24 22 15 00 2268-66 S co CCGG 68.410 -999.990 S.. R4 1994 02 02 08 27 00 -14.2500 -170.5700 60.30 42.00 18.30 123917 SMO 1994 01 24 23 05 00 41-91 P co CCGG 68.750 -999.990 ... R4 1994 02 18 08 56 00 -14.2500 -170.5700 47.00 42.00 5.00 123918 SMO 1994 01 24 23 05 00 42-91 P co CCGG 68.210 -999.990 ... R4 1994 02 18 09 12 00 -14.2500 -170.5700 47.00 42.00 5.00 123919 SMO 1994 02 04 23 05 00 2057-66 S co CCGG 55.580 -999.990 S.. R4 1994 02 22 15 28 00 -14.2500 -170.5700 60.30 42.00 18.30 123920 SMO 1994 02 04 23 05 00 2058-66 S co CCGG 55.660 -999.990 S.. R4 1994 02 22 15 44 00 -14.2500 -170.5700 60.30 42.00 18.30 123921 SMO 1994 02 04 23 30 00 349-91 P co CCGG 58.560 -999.990 ... R4 1994 02 18 10 02 00 -14.2500 -170.5700 47.00 42.00 5.00 123922 SMO 1994 02 04 23 30 00 350-91 P co CCGG 57.210 -999.990 ... R4 1994 02 18 10 18 00 -14.2500 -170.5700 47.00 42.00 5.00 123923 SMO 1994 02 10 22 40 00 2151-66 S co CCGG 58.990 -999.990 S.. R4 1994 02 22 14 51 00 -14.2500 -170.5700 60.30 42.00 18.30 123924 SMO 1994 02 10 22 40 00 2152-66 S co CCGG 59.280 -999.990 S.. R4 1994 02 22 15 07 00 -14.2500 -170.5700 60.30 42.00 18.30 123925 SMO 1994 02 10 23 20 00 385-91 P co CCGG 59.320 -999.990 ... R4 1994 02 25 12 12 00 -14.2500 -170.5700 47.00 42.00 5.00 123926 SMO 1994 02 10 23 20 00 386-91 P co CCGG 59.140 -999.990 ... R4 1994 02 25 12 28 00 -14.2500 -170.5700 47.00 42.00 5.00 123927 SMO 1994 02 15 23 09 00 97-91 P co CCGG 51.960 -999.990 ... R4 1994 02 25 12 45 00 -14.2500 -170.5700 47.00 42.00 5.00 123928 SMO 1994 02 15 23 09 00 98-91 P co CCGG 51.870 -999.990 ... R4 1994 02 25 13 01 00 -14.2500 -170.5700 47.00 42.00 5.00 123929 SMO 1994 02 16 00 14 00 2223-66 S co CCGG 50.270 -999.990 S.. R4 1994 03 11 08 51 00 -14.2500 -170.5700 60.30 42.00 18.30 123930 SMO 1994 02 16 00 14 00 2224-66 S co CCGG 51.880 -999.990 S.. R4 1994 03 11 09 07 00 -14.2500 -170.5700 60.30 42.00 18.30 123931 SMO 1994 02 28 22 35 00 2207-66 S co CCGG 69.400 -999.990 S.. R4 1994 03 11 09 23 00 -14.2500 -170.5700 60.30 42.00 18.30 123932 SMO 1994 02 28 22 35 00 2208-66 S co CCGG 68.840 -999.990 S.. R4 1994 03 11 09 39 00 -14.2500 -170.5700 60.30 42.00 18.30 123933 SMO 1994 03 01 02 55 00 499-91 P co CCGG 71.220 -999.990 ... R4 1994 03 29 10 09 00 -14.2500 -170.5700 47.00 42.00 5.00 123934 SMO 1994 03 01 02 55 00 500-91 P co CCGG 70.320 -999.990 ... R4 1994 03 29 10 25 00 -14.2500 -170.5700 47.00 42.00 5.00 123935 SMO 1994 03 15 01 27 00 2021-66 S co CCGG 50.220 -999.990 S.. R4 1994 03 30 11 46 00 -14.2500 -170.5700 60.30 42.00 18.30 123936 SMO 1994 03 15 01 27 00 2022-66 S co CCGG 50.670 -999.990 S.. R4 1994 03 30 12 02 00 -14.2500 -170.5700 60.30 42.00 18.30 123937 SMO 1994 03 15 23 10 00 31-91 P co CCGG 53.010 -999.990 ... R4 1994 03 29 09 36 00 -14.2500 -170.5700 47.00 42.00 5.00 123938 SMO 1994 03 15 23 10 00 32-91 P co CCGG 52.120 -999.990 ... R4 1994 03 29 09 52 00 -14.2500 -170.5700 47.00 42.00 5.00 123939 SMO 1994 03 22 22 36 00 2051-66 S co CCGG 66.820 -999.990 S.. R4 1994 03 30 12 18 00 -14.2500 -170.5700 60.30 42.00 18.30 123940 SMO 1994 03 22 22 36 00 2052-66 S co CCGG 67.190 -999.990 S.. R4 1994 03 30 12 34 00 -14.2500 -170.5700 60.30 42.00 18.30 123941 SMO 1994 03 22 23 40 00 257-91 P co CCGG 70.170 -999.990 ... R4 1994 04 15 07 47 00 -14.2500 -170.5700 47.00 42.00 5.00 123943 SMO 1994 04 01 22 55 00 100-91 P co CCGG 55.990 -999.990 ... R4 1994 04 15 08 20 00 -14.2500 -170.5700 47.00 42.00 5.00 123945 SMO 1994 04 01 22 55 00 99-91 P co CCGG 55.740 -999.990 ... R4 1994 04 15 08 04 00 -14.2500 -170.5700 47.00 42.00 5.00 123944 SMO 1994 04 02 00 10 00 2103-66 S co CCGG 54.680 -999.990 S.. R4 1994 04 21 07 46 00 -14.2500 -170.5700 60.30 42.00 18.30 123946 SMO 1994 04 02 00 10 00 2104-66 S co CCGG 54.510 -999.990 S.. R4 1994 04 21 08 02 00 -14.2500 -170.5700 60.30 42.00 18.30 123947 SMO 1994 04 06 22 15 00 2073-66 S co CCGG 54.280 -999.990 S.. R4 1994 04 21 08 19 00 -14.2500 -170.5700 60.30 42.00 18.30 123948 SMO 1994 04 06 22 15 00 2074-66 S co CCGG 53.540 -999.990 S.. R4 1994 04 21 08 35 00 -14.2500 -170.5700 60.30 42.00 18.30 123949 SMO 1994 04 06 22 55 00 53-91 P co CCGG 57.290 -999.990 ... R4 1994 04 26 13 04 00 -14.2500 -170.5700 47.00 42.00 5.00 123950 SMO 1994 04 06 22 55 00 54-91 P co CCGG 55.560 -999.990 ... R4 1994 04 26 13 20 00 -14.2500 -170.5700 47.00 42.00 5.00 123951 SMO 1994 04 14 22 40 00 2317-66 S co CCGG 63.670 -999.990 S.. R4 1994 05 16 13 58 00 -14.2500 -170.5700 60.30 42.00 18.30 123952 SMO 1994 04 14 22 40 00 2318-66 S co CCGG 64.020 -999.990 S.. R4 1994 05 16 14 14 00 -14.2500 -170.5700 60.30 42.00 18.30 123953 SMO 1994 04 28 23 10 00 2367-66 S co CCGG 59.040 -999.990 S.. R4 1994 05 16 14 30 00 -14.2500 -170.5700 60.30 42.00 18.30 123954 SMO 1994 04 28 23 10 00 2368-66 S co CCGG 56.900 -999.990 S.. R4 1994 05 16 14 46 00 -14.2500 -170.5700 60.30 42.00 18.30 123955 SMO 1994 04 28 23 40 00 657-91 P co CCGG 54.920 -999.990 ... R4 1994 05 23 09 40 00 -14.2500 -170.5700 47.00 42.00 5.00 123956 SMO 1994 04 28 23 40 00 658-91 P co CCGG 55.570 -999.990 ... R4 1994 05 23 09 57 00 -14.2500 -170.5700 47.00 42.00 5.00 123957 SMO 1994 05 05 22 35 00 2125-66 S co CCGG 57.610 -999.990 S.. R4 1994 06 09 14 52 00 -14.2500 -170.5700 60.30 42.00 18.30 123958 SMO 1994 05 05 22 35 00 2126-66 S co CCGG 58.030 -999.990 S.. R4 1994 06 09 15 08 00 -14.2500 -170.5700 60.30 42.00 18.30 123959 SMO 1994 05 05 23 45 00 227-91 P co CCGG 58.140 -999.990 ... R4 1994 05 23 09 07 00 -14.2500 -170.5700 47.00 42.00 5.00 123960 SMO 1994 05 05 23 45 00 228-91 P co CCGG 57.160 -999.990 ... R4 1994 05 23 09 24 00 -14.2500 -170.5700 47.00 42.00 5.00 123961 SMO 1994 05 12 00 22 00 2337-66 S co CCGG 69.060 -999.990 S.. R4 1994 06 09 14 19 00 -14.2500 -170.5700 60.30 42.00 18.30 123962 SMO 1994 05 12 00 22 00 2338-66 S co CCGG 70.640 -999.990 S.. R4 1994 06 09 14 35 00 -14.2500 -170.5700 60.30 42.00 18.30 123963 SMO 1994 05 13 00 45 00 371-91 P co CCGG 62.840 -999.990 ... R4 1994 05 25 13 56 00 -14.2500 -170.5700 47.00 42.00 5.00 123964 SMO 1994 05 13 00 45 00 372-91 P co CCGG 63.420 -999.990 ... R4 1994 05 25 14 13 00 -14.2500 -170.5700 47.00 42.00 5.00 123965 SMO 1994 05 17 22 22 00 2259-66 S co CCGG 52.910 -999.990 S.. R4 1994 05 25 13 24 00 -14.2500 -170.5700 60.30 42.00 18.30 123966 SMO 1994 05 17 22 22 00 2260-66 S co CCGG 55.200 -999.990 S.. R4 1994 05 25 13 40 00 -14.2500 -170.5700 60.30 42.00 18.30 123967 SMO 1994 05 17 23 25 00 313-91 P co CCGG 56.640 -999.990 ... R4 1994 05 25 14 29 00 -14.2500 -170.5700 47.00 42.00 5.00 123968 SMO 1994 05 17 23 25 00 314-91 P co CCGG 58.400 -999.990 ... R4 1994 05 25 14 46 00 -14.2500 -170.5700 47.00 42.00 5.00 123969 SMO 1994 05 23 23 15 00 2061-66 S co CCGG 60.840 -999.990 S.. R4 1994 06 28 15 57 00 -14.2500 -170.5700 60.30 42.00 18.30 123970 SMO 1994 05 23 23 15 00 2062-66 S co CCGG 62.020 -999.990 S.. R4 1994 06 28 16 13 00 -14.2500 -170.5700 60.30 42.00 18.30 123971 SMO 1994 05 23 23 40 00 121-91 P co CCGG 62.670 -999.990 ... R4 1994 06 16 16 37 00 -14.2500 -170.5700 47.00 42.00 5.00 123972 SMO 1994 05 23 23 40 00 122-91 P co CCGG 62.660 -999.990 ... R4 1994 06 16 16 53 00 -14.2500 -170.5700 47.00 42.00 5.00 123973 SMO 1994 06 01 01 30 00 319-91 P co CCGG 58.540 -999.990 ... R4 1994 06 16 16 04 00 -14.2500 -170.5700 47.00 42.00 5.00 123974 SMO 1994 06 01 01 30 00 320-91 P co CCGG 57.820 -999.990 ... R4 1994 06 16 16 20 00 -14.2500 -170.5700 47.00 42.00 5.00 123975 SMO 1994 06 01 02 40 00 2237-66 S co CCGG 58.930 -999.990 S.. R4 1994 06 28 15 19 00 -14.2500 -170.5700 60.30 42.00 18.30 123976 SMO 1994 06 01 02 40 00 2238-66 S co CCGG 59.720 -999.990 S.. R4 1994 06 28 15 35 00 -14.2500 -170.5700 60.30 42.00 18.30 123977 SMO 1994 06 13 23 40 00 2207-66 S co CCGG 62.160 -999.990 S.. R4 1994 07 13 15 45 00 -14.2500 -170.5700 60.30 42.00 18.30 123978 SMO 1994 06 13 23 40 00 2208-66 S co CCGG 61.220 -999.990 S.. R4 1994 07 13 16 01 00 -14.2500 -170.5700 60.30 42.00 18.30 123979 SMO 1994 06 15 01 20 00 55-91 P co CCGG 63.610 -999.990 ... R4 1994 07 13 12 47 00 -14.2500 -170.5700 47.00 42.00 5.00 123980 SMO 1994 06 15 01 20 00 56-91 P co CCGG 63.900 -999.990 ... R4 1994 07 13 13 03 00 -14.2500 -170.5700 47.00 42.00 5.00 123981 SMO 1994 06 21 00 20 00 2227-66 S co CCGG 58.900 -999.990 S.. R4 1994 07 13 16 17 00 -14.2500 -170.5700 60.30 42.00 18.30 123982 SMO 1994 06 21 00 20 00 2228-66 S co CCGG 59.090 -999.990 S.. R4 1994 07 13 16 33 00 -14.2500 -170.5700 60.30 42.00 18.30 123983 SMO 1994 06 21 00 48 00 225-91 P co CCGG 60.430 -999.990 ... R4 1994 07 13 12 14 00 -14.2500 -170.5700 47.00 42.00 5.00 123984 SMO 1994 06 21 00 48 00 226-91 P co CCGG 59.170 -999.990 ... R4 1994 07 13 12 30 00 -14.2500 -170.5700 47.00 42.00 5.00 123985 SMO 1994 07 01 00 50 00 2311-66 S co CCGG 61.550 -999.990 S.. R4 1994 08 10 11 03 00 -14.2500 -170.5700 60.30 42.00 18.30 123986 SMO 1994 07 01 00 50 00 2312-66 S co CCGG 61.310 -999.990 S.. R4 1994 08 10 11 19 00 -14.2500 -170.5700 60.30 42.00 18.30 123987 SMO 1994 07 01 01 25 00 203-91 P co CCGG 61.160 -999.990 ... R4 1994 08 02 14 26 00 -14.2500 -170.5700 47.00 42.00 5.00 123988 SMO 1994 07 01 01 25 00 204-91 P co CCGG 60.620 -999.990 ... R4 1994 08 02 14 43 00 -14.2500 -170.5700 47.00 42.00 5.00 123989 SMO 1994 07 05 22 52 00 95-91 P co CCGG 60.040 -999.990 ... R4 1994 08 02 15 31 00 -14.2500 -170.5700 47.00 42.00 5.00 123990 SMO 1994 07 05 22 52 00 96-91 P co CCGG 59.740 -999.990 ... R4 1994 08 02 15 48 00 -14.2500 -170.5700 47.00 42.00 5.00 123991 SMO 1994 07 06 00 35 00 2160-66 S co CCGG 59.100 -999.990 S.. R4 1994 08 10 12 57 00 -14.2500 -170.5700 60.30 42.00 18.30 123992 SMO 1994 07 19 22 05 00 2333-66 S co CCGG 65.710 -999.990 S.. R4 1994 08 10 12 08 00 -14.2500 -170.5700 60.30 42.00 18.30 123993 SMO 1994 07 19 22 05 00 2334-66 S co CCGG 64.730 -999.990 S.. R4 1994 08 10 12 24 00 -14.2500 -170.5700 60.30 42.00 18.30 123994 SMO 1994 07 19 22 55 00 701-91 P co CCGG 65.230 -999.990 ... R4 1994 08 19 13 48 00 -14.2500 -170.5700 47.00 42.00 5.00 123995 SMO 1994 07 19 22 55 00 702-91 P co CCGG 64.620 -999.990 ... R4 1994 08 19 14 04 00 -14.2500 -170.5700 47.00 42.00 5.00 123996 SMO 1994 07 27 22 55 00 527-91 P co CCGG 63.270 -999.990 ... R4 1994 08 19 11 30 00 -14.2500 -170.5700 47.00 42.00 5.00 123997 SMO 1994 07 27 22 55 00 528-91 P co CCGG 64.190 -999.990 ... R4 1994 08 19 11 46 00 -14.2500 -170.5700 47.00 42.00 5.00 123998 SMO 1994 07 28 00 30 00 2185-66 S co CCGG 62.810 -999.990 S.. R4 1994 08 10 08 43 00 -14.2500 -170.5700 60.30 42.00 18.30 123999 SMO 1994 07 28 00 30 00 2186-66 S co CCGG 62.460 -999.990 S.. R4 1994 08 10 08 59 00 -14.2500 -170.5700 60.30 42.00 18.30 124000 SMO 1994 08 03 22 15 00 2073-66 S co CCGG 70.260 -999.990 S.. R4 1994 08 17 13 32 00 -14.2500 -170.5700 60.30 42.00 18.30 124001 SMO 1994 08 03 22 15 00 2074-66 S co CCGG 69.770 -999.990 S.. R4 1994 08 17 13 48 00 -14.2500 -170.5700 60.30 42.00 18.30 124002 SMO 1994 08 03 23 00 00 133-91 P co CCGG 72.650 -999.990 ... R4 1994 08 17 15 27 00 -14.2500 -170.5700 47.00 42.00 5.00 124003 SMO 1994 08 03 23 00 00 134-91 P co CCGG 71.730 -999.990 ... R4 1994 08 17 15 44 00 -14.2500 -170.5700 47.00 42.00 5.00 124004 SMO 1994 08 09 22 55 00 109-91 P co CCGG 68.810 -999.990 ... R4 1994 08 17 14 04 00 -14.2500 -170.5700 47.00 42.00 5.00 124005 SMO 1994 08 09 22 55 00 110-91 P co CCGG 67.990 -999.990 ... R4 1994 08 17 14 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124006 SMO 1994 08 10 00 30 00 2003-66 S co CCGG 67.300 -999.990 S.. R4 1994 08 17 13 00 00 -14.2500 -170.5700 60.30 42.00 18.30 124007 SMO 1994 08 10 00 30 00 2004-66 S co CCGG 66.740 -999.990 S.. R4 1994 08 17 13 16 00 -14.2500 -170.5700 60.30 42.00 18.30 124008 SMO 1994 08 15 21 45 00 2367-66 S co CCGG 60.620 -999.990 S.. R4 1994 09 07 16 34 00 -14.2500 -170.5700 60.30 42.00 18.30 124009 SMO 1994 08 15 21 45 00 2368-66 S co CCGG 60.980 -999.990 S.. R4 1994 09 07 16 50 00 -14.2500 -170.5700 60.30 42.00 18.30 124010 SMO 1994 08 15 23 30 00 335-91 P co CCGG 60.550 -999.990 ... R4 1994 09 02 15 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124011 SMO 1994 08 15 23 30 00 336-91 P co CCGG 60.410 -999.990 ... R4 1994 09 02 15 52 00 -14.2500 -170.5700 47.00 42.00 5.00 124012 SMO 1994 08 23 23 15 00 2318-66 S co CCGG 67.850 -999.990 S.. R4 1994 09 07 15 09 00 -14.2500 -170.5700 60.30 42.00 18.30 124014 SMO 1994 08 24 00 15 00 181-91 P co CCGG 67.530 -999.990 ... R4 1994 09 02 14 31 00 -14.2500 -170.5700 47.00 42.00 5.00 124015 SMO 1994 08 24 00 15 00 182-91 P co CCGG 68.810 -999.990 ... R4 1994 09 02 14 47 00 -14.2500 -170.5700 47.00 42.00 5.00 124016 SMO 1994 09 07 21 30 00 2259-66 S co CCGG 67.100 -999.990 S.. R4 1994 10 03 09 27 00 -14.2500 -170.5700 60.30 42.00 18.30 124017 SMO 1994 09 07 21 30 00 2260-66 S co CCGG 68.740 -999.990 S.. R4 1994 10 03 09 43 00 -14.2500 -170.5700 60.30 42.00 18.30 124018 SMO 1994 09 07 22 30 00 371-91 P co CCGG 69.010 -999.990 ... R4 1994 09 27 16 52 00 -14.2500 -170.5700 47.00 42.00 5.00 124019 SMO 1994 09 07 22 30 00 372-91 P co CCGG 69.020 -999.990 ... R4 1994 09 27 17 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124020 SMO 1994 09 15 00 00 00 537-91 P co CCGG 66.470 -999.990 ... R4 1994 09 27 15 46 00 -14.2500 -170.5700 47.00 42.00 5.00 124021 SMO 1994 09 15 00 00 00 538-91 P co CCGG 66.930 -999.990 ... R4 1994 09 27 16 02 00 -14.2500 -170.5700 47.00 42.00 5.00 124022 SMO 1994 09 15 01 30 00 2093-66 S co CCGG 67.160 -999.990 S.. R4 1994 09 30 15 27 00 -14.2500 -170.5700 60.30 42.00 18.30 124023 SMO 1994 09 15 01 30 00 2094-66 S co CCGG 67.650 -999.990 S.. R4 1994 09 30 15 43 00 -14.2500 -170.5700 60.30 42.00 18.30 124024 SMO 1994 09 22 01 15 00 373-91 D co CCGG 81.300 -999.990 ... R4 1994 10 03 12 38 00 -14.2500 -170.5700 47.00 42.00 5.00 124027 SMO 1994 09 22 01 15 00 374-91 D co CCGG 81.120 -999.990 ... R4 1994 10 03 12 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124028 SMO 1994 09 22 01 15 00 45-91 P co CCGG 80.660 -999.990 ... R4 1994 10 03 14 15 00 -14.2500 -170.5700 47.00 42.00 5.00 124025 SMO 1994 09 22 01 15 00 46-91 P co CCGG 81.060 -999.990 ... R4 1994 10 03 14 31 00 -14.2500 -170.5700 47.00 42.00 5.00 124026 SMO 1994 09 22 02 25 00 2225-66 S co CCGG 79.000 -999.990 S.. R4 1994 10 05 16 31 00 -14.2500 -170.5700 60.30 42.00 18.30 124029 SMO 1994 09 22 02 25 00 2226-66 S co CCGG 82.180 -999.990 S.. R4 1994 10 05 16 47 00 -14.2500 -170.5700 60.30 42.00 18.30 124030 SMO 1994 09 26 23 45 00 255-91 P co CCGG 81.920 -999.990 ... R4 1994 10 07 11 40 00 -14.2500 -170.5700 47.00 42.00 5.00 124031 SMO 1994 09 26 23 45 00 719-91 D co CCGG 78.200 -999.990 ... R4 1994 10 07 09 18 00 -14.2500 -170.5700 47.00 42.00 5.00 124033 SMO 1994 09 26 23 45 00 720-91 D co CCGG 79.320 -999.990 ... R4 1994 10 07 09 34 00 -14.2500 -170.5700 47.00 42.00 5.00 124034 SMO 1994 09 27 00 20 00 2135-66 S co CCGG 76.080 -999.990 S.. R4 1994 10 05 15 58 00 -14.2500 -170.5700 60.30 42.00 18.30 124035 SMO 1994 09 27 00 20 00 2136-66 S co CCGG 76.340 -999.990 S.. R4 1994 10 05 16 15 00 -14.2500 -170.5700 60.30 42.00 18.30 124036 SMO 1994 10 04 22 25 00 2001-66 S co CCGG 74.020 -999.990 S.. R4 1994 10 20 15 15 00 -14.2500 -170.5700 60.30 42.00 18.30 124037 SMO 1994 10 04 22 25 00 2002-66 S co CCGG 75.300 -999.990 S.. R4 1994 10 20 15 32 00 -14.2500 -170.5700 60.30 42.00 18.30 124038 SMO 1994 10 04 23 15 00 659-91 D co CCGG 77.190 -999.990 ... R4 1994 11 01 12 16 00 -14.2500 -170.5700 47.00 42.00 5.00 124039 SMO 1994 10 04 23 15 00 660-91 D co CCGG 75.940 -999.990 ... R4 1994 11 01 12 32 00 -14.2500 -170.5700 47.00 42.00 5.00 124040 SMO 1994 10 04 23 15 00 835-91 P co CCGG 76.090 -999.990 ... R4 1994 11 01 09 08 00 -14.2500 -170.5700 47.00 42.00 5.00 124041 SMO 1994 10 04 23 15 00 836-91 P co CCGG 75.450 -999.990 ... R4 1994 11 01 09 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124042 SMO 1994 10 12 21 45 00 2207-66 S co CCGG 83.200 -999.990 S.. R4 1994 10 20 14 14 00 -14.2500 -170.5700 60.30 42.00 18.30 124043 SMO 1994 10 12 21 45 00 2208-66 S co CCGG 83.050 -999.990 S.. R4 1994 10 20 14 30 00 -14.2500 -170.5700 60.30 42.00 18.30 124044 SMO 1994 10 12 23 20 00 237-91 D co CCGG 89.110 -999.990 ... R4 1994 11 07 08 30 00 -14.2500 -170.5700 47.00 42.00 5.00 124045 SMO 1994 10 12 23 20 00 238-91 D co CCGG 88.960 -999.990 ... R4 1994 11 07 08 46 00 -14.2500 -170.5700 47.00 42.00 5.00 124046 SMO 1994 10 12 23 20 00 667-91 P co CCGG 86.410 -999.990 ... R4 1994 11 07 10 07 00 -14.2500 -170.5700 47.00 42.00 5.00 124047 SMO 1994 10 12 23 20 00 668-91 P co CCGG 87.590 -999.990 ... R4 1994 11 07 10 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124048 SMO 1994 10 19 23 05 00 2103-66 S co CCGG 76.380 -999.990 S.. R4 1994 11 08 14 00 00 -14.2500 -170.5700 60.30 42.00 18.30 124049 SMO 1994 10 19 23 05 00 2104-66 S co CCGG 75.620 -999.990 S.. R4 1994 11 08 14 17 00 -14.2500 -170.5700 60.30 42.00 18.30 124050 SMO 1994 10 19 23 50 00 103-91 P co CCGG 77.250 -999.990 ... R4 1994 11 09 11 51 00 -14.2500 -170.5700 47.00 42.00 5.00 124051 SMO 1994 10 19 23 50 00 104-91 P co CCGG 78.220 -999.990 ... R4 1994 11 09 12 07 00 -14.2500 -170.5700 47.00 42.00 5.00 124052 SMO 1994 10 19 23 50 00 335-91 D co CCGG 77.660 -999.990 ... R4 1994 11 09 12 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124053 SMO 1994 10 19 23 50 00 336-91 D co CCGG 78.300 -999.990 ... R4 1994 11 09 12 40 00 -14.2500 -170.5700 47.00 42.00 5.00 124054 SMO 1994 10 26 01 40 00 167-91 P co CCGG 82.030 -999.990 ... R4 1994 11 03 14 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124055 SMO 1994 10 26 01 40 00 168-91 P co CCGG 81.130 -999.990 ... R4 1994 11 03 14 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124056 SMO 1994 10 26 01 40 00 207-91 D co CCGG 83.090 -999.990 ... R4 1994 11 03 12 53 00 -14.2500 -170.5700 47.00 42.00 5.00 124057 SMO 1994 10 26 01 40 00 208-91 D co CCGG 81.650 -999.990 ... R4 1994 11 03 13 10 00 -14.2500 -170.5700 47.00 42.00 5.00 124058 SMO 1994 10 26 02 45 00 2237-66 S co CCGG 78.380 -999.990 S.. R4 1994 11 08 14 33 00 -14.2500 -170.5700 60.30 42.00 18.30 124059 SMO 1994 10 26 02 45 00 2238-66 S co CCGG 79.180 -999.990 S.. R4 1994 11 08 14 49 00 -14.2500 -170.5700 60.30 42.00 18.30 124060 SMO 1994 11 01 23 20 00 2311-66 S co CCGG 77.630 -999.990 S.. R4 1994 12 02 15 22 00 -14.2500 -170.5700 60.30 42.00 18.30 124061 SMO 1994 11 01 23 20 00 2312-66 S co CCGG 78.450 -999.990 S.. R4 1994 12 02 15 38 00 -14.2500 -170.5700 60.30 42.00 18.30 124062 SMO 1994 11 02 01 00 00 275-91 D co CCGG 79.430 -999.990 ... R4 1994 11 15 08 35 00 -14.2500 -170.5700 47.00 42.00 5.00 124063 SMO 1994 11 02 01 00 00 276-91 D co CCGG 79.820 -999.990 ... R4 1994 11 15 08 52 00 -14.2500 -170.5700 47.00 42.00 5.00 124064 SMO 1994 11 02 01 00 00 315-91 P co CCGG 79.120 -999.990 ... R4 1994 11 15 10 15 00 -14.2500 -170.5700 47.00 42.00 5.00 124065 SMO 1994 11 02 01 00 00 316-91 P co CCGG 79.260 -999.990 ... R4 1994 11 15 10 31 00 -14.2500 -170.5700 47.00 42.00 5.00 124066 SMO 1994 11 10 01 00 00 1175-91 P co CCGG 78.750 -999.990 ... R4 1994 12 01 16 15 00 -14.2500 -170.5700 47.00 42.00 5.00 124067 SMO 1994 11 10 01 00 00 1176-91 P co CCGG 78.210 -999.990 ... R4 1994 12 01 16 31 00 -14.2500 -170.5700 47.00 42.00 5.00 124068 SMO 1994 11 10 01 00 00 1177-91 D co CCGG 79.880 -999.990 ... R4 1994 12 01 14 28 00 -14.2500 -170.5700 47.00 42.00 5.00 124069 SMO 1994 11 10 01 00 00 1178-91 D co CCGG 80.160 -999.990 ... R4 1994 12 01 14 44 00 -14.2500 -170.5700 47.00 42.00 5.00 124070 SMO 1994 11 10 02 10 00 2185-66 S co CCGG 76.970 -999.990 S.. R4 1994 12 05 13 28 00 -14.2500 -170.5700 60.30 42.00 18.30 124071 SMO 1994 11 10 02 10 00 2186-66 S co CCGG 76.010 -999.990 S.. R4 1994 12 05 13 44 00 -14.2500 -170.5700 60.30 42.00 18.30 124072 SMO 1994 11 16 00 25 00 233-91 D co CCGG 75.770 -999.990 ... R4 1994 12 16 08 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124075 SMO 1994 11 16 00 25 00 234-91 D co CCGG 74.290 -999.990 ... R4 1994 12 16 08 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124076 SMO 1994 11 16 00 25 00 59-91 P co CCGG 74.620 -999.990 ... R4 1994 12 16 09 46 00 -14.2500 -170.5700 47.00 42.00 5.00 124073 SMO 1994 11 16 00 25 00 60-91 P co CCGG 74.470 -999.990 ... R4 1994 12 16 10 03 00 -14.2500 -170.5700 47.00 42.00 5.00 124074 SMO 1994 11 17 00 26 00 2367-66 S co CCGG 72.200 -999.990 S.. R4 1994 12 28 10 15 00 -14.2500 -170.5700 60.30 42.00 18.30 124077 SMO 1994 11 17 00 26 00 2368-66 S co CCGG 72.540 -999.990 S.. R4 1994 12 28 10 31 00 -14.2500 -170.5700 60.30 42.00 18.30 124078 SMO 1994 11 22 23 24 00 181-91 D co CCGG 75.340 -999.990 ... R4 1994 12 02 09 03 00 -14.2500 -170.5700 47.00 42.00 5.00 124079 SMO 1994 11 22 23 24 00 182-91 D co CCGG 75.020 -999.990 ... R4 1994 12 02 09 19 00 -14.2500 -170.5700 47.00 42.00 5.00 124080 SMO 1994 11 22 23 24 00 825-91 P co CCGG 73.370 -999.990 ... R4 1994 12 02 08 30 00 -14.2500 -170.5700 47.00 42.00 5.00 124081 SMO 1994 11 22 23 24 00 826-91 P co CCGG 73.320 -999.990 ... R4 1994 12 02 08 47 00 -14.2500 -170.5700 47.00 42.00 5.00 124082 SMO 1994 11 23 00 47 00 2061-66 S co CCGG 71.010 -999.990 S.. R4 1994 12 27 14 32 00 -14.2500 -170.5700 60.30 42.00 18.30 124083 SMO 1994 11 23 00 47 00 2062-66 S co CCGG 71.640 -999.990 S.. R4 1994 12 27 14 48 00 -14.2500 -170.5700 60.30 42.00 18.30 124084 SMO 1994 11 29 12 34 56 841-91 P co CCGG 210.320 -999.990 .N. R4 1994 12 14 14 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124089 SMO 1994 11 29 22 10 00 2329-66 S co CCGG 70.060 -999.990 S.. R4 1995 01 04 16 52 00 -14.2500 -170.5700 60.30 42.00 18.30 124085 SMO 1994 11 29 22 10 00 2330-66 S co CCGG 70.220 -999.990 S.. R4 1995 01 04 17 08 00 -14.2500 -170.5700 60.30 42.00 18.30 124086 SMO 1994 11 29 22 30 00 503-91 D co CCGG 66.520 -999.990 ... R4 1994 12 15 07 33 00 -14.2500 -170.5700 47.00 42.00 5.00 124087 SMO 1994 11 29 22 30 00 504-91 D co CCGG 67.510 -999.990 ... R4 1994 12 15 07 49 00 -14.2500 -170.5700 47.00 42.00 5.00 124088 SMO 1994 12 12 22 15 00 2037-66 S co CCGG 65.590 -999.990 S.. R4 1995 01 04 17 24 00 -14.2500 -170.5700 60.30 42.00 18.30 124090 SMO 1994 12 12 22 15 00 2038-66 S co CCGG 65.300 -999.990 S.. R4 1995 01 04 17 40 00 -14.2500 -170.5700 60.30 42.00 18.30 124091 SMO 1994 12 12 22 45 00 103-91 P co CCGG 68.320 -999.990 ... R4 1994 12 30 12 44 00 -14.2500 -170.5700 47.00 42.00 5.00 124092 SMO 1994 12 12 22 45 00 104-91 P co CCGG 67.880 -999.990 ... R4 1994 12 30 13 01 00 -14.2500 -170.5700 47.00 42.00 5.00 124093 SMO 1994 12 12 22 45 00 357-91 D co CCGG 67.960 -999.990 ... R4 1995 01 03 10 45 00 -14.2500 -170.5700 47.00 42.00 5.00 124094 SMO 1994 12 12 22 45 00 358-91 D co CCGG 68.160 -999.990 ... R4 1995 01 03 11 01 00 -14.2500 -170.5700 47.00 42.00 5.00 124095 SMO 1994 12 20 23 10 00 349-91 P co CCGG 75.660 -999.990 ... R4 1995 01 17 14 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124096 SMO 1994 12 20 23 10 00 350-91 P co CCGG 74.620 -999.990 ... R4 1995 01 17 14 42 00 -14.2500 -170.5700 47.00 42.00 5.00 124097 SMO 1994 12 20 23 10 00 667-91 D co CCGG 75.960 -999.990 ... R4 1995 01 17 14 59 00 -14.2500 -170.5700 47.00 42.00 5.00 124098 SMO 1994 12 20 23 10 00 668-91 D co CCGG 75.150 -999.990 ... R4 1995 01 17 15 15 00 -14.2500 -170.5700 47.00 42.00 5.00 124099 SMO 1994 12 21 00 40 00 2093-66 S co CCGG 71.730 -999.990 S.. R4 1995 01 20 13 09 00 -14.2500 -170.5700 60.30 42.00 18.30 124100 SMO 1994 12 21 00 40 00 2094-66 S co CCGG 73.480 -999.990 S.. R4 1995 01 20 13 26 00 -14.2500 -170.5700 60.30 42.00 18.30 124101 SMO 1995 01 03 23 50 00 1173-91 P co CCGG 61.370 -999.990 ... R4 1995 01 18 11 47 00 -14.2500 -170.5700 47.00 42.00 5.00 124102 SMO 1995 01 03 23 50 00 1174-91 P co CCGG 61.340 -999.990 ... R4 1995 01 18 12 04 00 -14.2500 -170.5700 47.00 42.00 5.00 124103 SMO 1995 01 03 23 50 00 1179-91 D co CCGG 63.290 -999.990 ... R4 1995 01 18 15 15 00 -14.2500 -170.5700 47.00 42.00 5.00 124104 SMO 1995 01 03 23 50 00 1180-91 D co CCGG 65.950 -999.990 ... R4 1995 01 18 15 32 00 -14.2500 -170.5700 47.00 42.00 5.00 124105 SMO 1995 01 04 02 30 00 2333-66 S co CCGG 60.560 -999.990 S.. R4 1995 01 20 14 15 00 -14.2500 -170.5700 60.30 42.00 18.30 124106 SMO 1995 01 04 02 30 00 2334-66 S co CCGG 59.950 -999.990 S.. R4 1995 01 20 14 31 00 -14.2500 -170.5700 60.30 42.00 18.30 124107 SMO 1995 01 10 22 44 00 2369-66 S co CCGG 54.440 -999.990 S.. R4 1995 02 27 12 06 00 -14.2500 -170.5700 60.30 42.00 18.30 124108 SMO 1995 01 10 22 44 00 2370-66 S co CCGG 54.800 -999.990 S.. R4 1995 02 27 12 22 00 -14.2500 -170.5700 60.30 42.00 18.30 124109 SMO 1995 01 10 23 10 00 275-91 D co CCGG 55.250 -999.990 ... R4 1995 01 18 11 14 00 -14.2500 -170.5700 47.00 42.00 5.00 124110 SMO 1995 01 10 23 10 00 276-91 D co CCGG 56.720 -999.990 ... R4 1995 01 18 11 30 00 -14.2500 -170.5700 47.00 42.00 5.00 124111 SMO 1995 01 10 23 10 00 377-91 P co CCGG 55.420 -999.990 ... R4 1995 01 18 12 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124112 SMO 1995 01 10 23 10 00 378-91 P co CCGG 55.310 -999.990 ... R4 1995 01 18 12 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124113 SMO 1995 01 31 22 55 00 167-91 P co CCGG 64.480 -999.990 ... R4 1995 02 13 11 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124114 SMO 1995 01 31 22 55 00 168-91 P co CCGG 63.390 -999.990 ... R4 1995 02 13 11 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124115 SMO 1995 01 31 22 55 00 2053-66 S co CCGG 60.850 -999.990 S.. R4 1995 02 27 11 34 00 -14.2500 -170.5700 60.30 42.00 18.30 124116 SMO 1995 01 31 22 55 00 2054-66 S co CCGG 59.540 -999.990 S.. R4 1995 02 27 11 50 00 -14.2500 -170.5700 60.30 42.00 18.30 124117 SMO 1995 02 01 00 25 00 157-91 D co CCGG 64.930 -999.990 ... R4 1995 02 13 11 53 00 -14.2500 -170.5700 47.00 42.00 5.00 124118 SMO 1995 02 01 00 25 00 158-91 D co CCGG 64.570 -999.990 ... R4 1995 02 13 12 10 00 -14.2500 -170.5700 47.00 42.00 5.00 124119 SMO 1995 02 13 21 40 00 239-91 P co CCGG 64.560 -999.990 ... R4 1995 03 01 07 39 00 -14.2500 -170.5700 47.00 42.00 5.00 124120 SMO 1995 02 13 21 40 00 240-91 P co CCGG 63.740 -999.990 ... R4 1995 03 01 07 55 00 -14.2500 -170.5700 47.00 42.00 5.00 124121 SMO 1995 02 13 21 40 00 679-91 D co CCGG 64.690 -999.990 ... R4 1995 03 01 08 12 00 -14.2500 -170.5700 47.00 42.00 5.00 124122 SMO 1995 02 13 21 40 00 680-91 D co CCGG 64.540 -999.990 ... R4 1995 03 01 08 28 00 -14.2500 -170.5700 47.00 42.00 5.00 124123 SMO 1995 02 14 00 35 00 2309-66 S co CCGG 62.130 -999.990 S.. R4 1995 03 13 08 56 00 -14.2500 -170.5700 60.30 42.00 18.30 124124 SMO 1995 02 14 00 35 00 2310-66 S co CCGG 62.980 -999.990 S.. R4 1995 03 13 09 12 00 -14.2500 -170.5700 60.30 42.00 18.30 124125 SMO 1995 02 22 01 20 00 265-91 D co CCGG 62.710 -999.990 ... R4 1995 03 16 12 19 00 -14.2500 -170.5700 47.00 42.00 5.00 124126 SMO 1995 02 22 01 20 00 266-91 D co CCGG 63.840 -999.990 ... R4 1995 03 16 12 35 00 -14.2500 -170.5700 47.00 42.00 5.00 124127 SMO 1995 02 22 01 20 00 533-91 P co CCGG 61.420 -999.990 ... R4 1995 03 16 13 25 00 -14.2500 -170.5700 47.00 42.00 5.00 124128 SMO 1995 02 22 01 20 00 534-91 P co CCGG 61.830 -999.990 ... R4 1995 03 16 13 42 00 -14.2500 -170.5700 47.00 42.00 5.00 124129 SMO 1995 02 22 02 10 00 2001-66 S co CCGG 60.160 -999.990 S.. R4 1995 03 13 08 24 00 -14.2500 -170.5700 60.30 42.00 18.30 124130 SMO 1995 02 22 02 10 00 2002-66 S co CCGG 60.430 -999.990 S.. R4 1995 03 13 08 40 00 -14.2500 -170.5700 60.30 42.00 18.30 124131 SMO 1995 03 02 23 40 00 70-91 P co CCGG 67.320 -999.990 ... R4 1995 03 14 13 04 00 -14.2500 -170.5700 47.00 42.00 5.00 124132 SMO 1995 03 02 23 40 00 763-91 D co CCGG 66.000 -999.990 ... R4 1995 03 14 11 25 00 -14.2500 -170.5700 47.00 42.00 5.00 124133 SMO 1995 03 02 23 40 00 764-91 D co CCGG 65.630 -999.990 ... R4 1995 03 14 11 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124134 SMO 1995 03 03 01 23 00 2207-66 S co CCGG 59.410 -999.990 S.. R4 1995 03 17 08 46 00 -14.2500 -170.5700 60.30 42.00 18.30 124135 SMO 1995 03 03 01 23 00 2208-66 S co CCGG 61.520 -999.990 S.. R4 1995 03 17 09 02 00 -14.2500 -170.5700 60.30 42.00 18.30 124136 SMO 1995 03 06 23 18 00 49-91 D co CCGG 56.950 -999.990 ... R4 1995 03 17 09 50 00 -14.2500 -170.5700 47.00 42.00 5.00 124137 SMO 1995 03 06 23 18 00 50-91 D co CCGG 56.830 -999.990 ... R4 1995 03 17 10 07 00 -14.2500 -170.5700 47.00 42.00 5.00 124138 SMO 1995 03 06 23 18 00 778-91 P co CCGG 55.710 -999.990 ... R4 1995 03 17 10 40 00 -14.2500 -170.5700 47.00 42.00 5.00 124139 SMO 1995 03 09 21 15 00 2151-66 S co CCGG 65.680 -999.990 S.. R4 1995 03 17 09 18 00 -14.2500 -170.5700 60.30 42.00 18.30 124140 SMO 1995 03 09 21 15 00 2152-66 S co CCGG 65.820 -999.990 S.. R4 1995 03 17 09 34 00 -14.2500 -170.5700 60.30 42.00 18.30 124141 SMO 1995 03 17 00 48 00 207-91 P co CCGG 54.040 -999.990 ... R4 1995 03 31 12 56 00 -14.2500 -170.5700 47.00 42.00 5.00 124142 SMO 1995 03 17 00 48 00 208-91 P co CCGG 53.040 -999.990 ... R4 1995 03 31 13 12 00 -14.2500 -170.5700 47.00 42.00 5.00 124143 SMO 1995 03 17 00 48 00 319-91 D co CCGG 54.040 -999.990 ... R4 1995 03 31 13 29 00 -14.2500 -170.5700 47.00 42.00 5.00 124144 SMO 1995 03 17 00 48 00 320-91 D co CCGG 54.540 -999.990 ... R4 1995 03 31 13 45 00 -14.2500 -170.5700 47.00 42.00 5.00 124145 SMO 1995 03 17 01 42 00 2103-66 S co CCGG 50.510 -999.990 S.. R4 1995 04 13 09 54 00 -14.2500 -170.5700 60.30 42.00 18.30 124146 SMO 1995 03 17 01 42 00 2104-66 S co CCGG 50.280 -999.990 S.. R4 1995 04 13 10 10 00 -14.2500 -170.5700 60.30 42.00 18.30 124147 SMO 1995 03 22 21 55 00 119-91 P co CCGG 53.880 -999.990 ... R4 1995 04 10 09 00 00 -14.2500 -170.5700 47.00 42.00 5.00 124148 SMO 1995 03 22 21 55 00 120-91 P co CCGG 52.980 -999.990 ... R4 1995 04 10 09 16 00 -14.2500 -170.5700 47.00 42.00 5.00 124149 SMO 1995 03 22 21 55 00 371-91 D co CCGG 52.590 -999.990 ... R4 1995 04 10 10 43 00 -14.2500 -170.5700 47.00 42.00 5.00 124150 SMO 1995 03 22 21 55 00 372-91 D co CCGG 53.480 -999.990 ... R4 1995 04 10 10 59 00 -14.2500 -170.5700 47.00 42.00 5.00 124151 SMO 1995 03 23 00 20 00 2057-66 S co CCGG 50.480 -999.990 S.. R4 1995 04 13 09 22 00 -14.2500 -170.5700 60.30 42.00 18.30 124152 SMO 1995 03 23 00 20 00 2058-66 S co CCGG 50.900 -999.990 S.. R4 1995 04 13 09 38 00 -14.2500 -170.5700 60.30 42.00 18.30 124153 SMO 1995 04 04 22 23 00 1251-91 D co CCGG 62.940 -999.990 ... R4 1995 04 18 17 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124154 SMO 1995 04 04 22 23 00 1252-91 D co CCGG 63.220 -999.990 ... R4 1995 04 18 18 13 00 -14.2500 -170.5700 47.00 42.00 5.00 124155 SMO 1995 04 04 22 23 00 1300-91 P co CCGG 62.400 -999.990 ... R4 1995 04 19 08 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124156 SMO 1995 04 04 22 25 00 2325-66 S co CCGG 64.260 -999.990 S.. R4 1995 04 25 17 14 00 -14.2500 -170.5700 60.30 42.00 18.30 124157 SMO 1995 04 04 22 25 00 2326-66 S co CCGG 63.590 -999.990 S.. R4 1995 04 25 17 30 00 -14.2500 -170.5700 60.30 42.00 18.30 124158 SMO 1995 04 18 23 25 00 161-91 D co CCGG 56.600 -999.990 ..> R4 1995 05 02 09 14 00 -14.2500 -170.5700 47.00 42.00 5.00 124159 SMO 1995 04 18 23 25 00 162-91 D co CCGG -999.990 -999.990 *.. R4 1995 05 02 09 30 00 -14.2500 -170.5700 47.00 42.00 5.00 124160 SMO 1995 04 18 23 25 00 767-91 P co CCGG 56.250 -999.990 ..< R4 1995 05 02 10 27 00 -14.2500 -170.5700 47.00 42.00 5.00 124161 SMO 1995 04 18 23 25 00 768-91 P co CCGG 56.770 -999.990 ..> R4 1995 05 02 10 43 00 -14.2500 -170.5700 47.00 42.00 5.00 124162 SMO 1995 04 19 01 25 00 2223-66 S co CCGG 49.150 -999.990 S.. R4 1995 04 25 16 42 00 -14.2500 -170.5700 60.30 42.00 18.30 124163 SMO 1995 04 19 01 25 00 2224-66 S co CCGG 52.220 -999.990 S.. R4 1995 04 25 16 58 00 -14.2500 -170.5700 60.30 42.00 18.30 124164 SMO 1995 04 25 22 14 00 1257-91 P co CCGG 51.770 -999.990 ... R4 1995 05 08 09 33 00 -14.2500 -170.5700 47.00 42.00 5.00 124165 SMO 1995 04 25 22 14 00 1258-91 P co CCGG 52.200 -999.990 ... R4 1995 05 08 09 50 00 -14.2500 -170.5700 47.00 42.00 5.00 124166 SMO 1995 04 25 22 16 00 1255-91 D co CCGG 51.780 -999.990 ... R4 1995 05 08 09 01 00 -14.2500 -170.5700 47.00 42.00 5.00 124167 SMO 1995 04 25 22 16 00 1256-91 D co CCGG 52.590 -999.990 ... R4 1995 05 08 09 17 00 -14.2500 -170.5700 47.00 42.00 5.00 124168 SMO 1995 04 25 23 17 00 2329-66 S co CCGG 53.910 -999.990 S.. R4 1995 05 15 15 15 00 -14.2500 -170.5700 60.30 42.00 18.30 124169 SMO 1995 04 25 23 17 00 2330-66 S co CCGG 52.940 -999.990 S.. R4 1995 05 15 15 32 00 -14.2500 -170.5700 60.30 42.00 18.30 124170 SMO 1995 05 08 21 15 00 137-91 D co CCGG 63.570 -999.990 ... R4 1995 05 16 11 48 00 -14.2500 -170.5700 47.00 42.00 5.00 124171 SMO 1995 05 08 21 15 00 597-91 P co CCGG 61.880 -999.990 ... R4 1995 05 16 09 13 00 -14.2500 -170.5700 47.00 42.00 5.00 124172 SMO 1995 05 08 21 15 00 598-91 P co CCGG 62.690 -999.990 ... R4 1995 05 16 09 30 00 -14.2500 -170.5700 47.00 42.00 5.00 124173 SMO 1995 05 08 22 30 00 2061-66 S co CCGG 59.450 -999.990 S.. R4 1995 05 15 14 43 00 -14.2500 -170.5700 60.30 42.00 18.30 124174 SMO 1995 05 08 22 30 00 2062-66 S co CCGG 58.820 -999.990 S.. R4 1995 05 15 14 59 00 -14.2500 -170.5700 60.30 42.00 18.30 124175 SMO 1995 05 23 23 00 00 295-91 P co CCGG 62.920 -999.990 ... R4 1995 06 15 11 29 00 -14.2500 -170.5700 47.00 42.00 5.00 124178 SMO 1995 05 23 23 00 00 296-91 P co CCGG 62.490 -999.990 ... R4 1995 06 15 11 45 00 -14.2500 -170.5700 47.00 42.00 5.00 124179 SMO 1995 05 23 23 00 00 77-91 D co CCGG 61.740 -999.990 ... R4 1995 06 15 14 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124176 SMO 1995 05 23 23 00 00 78-91 D co CCGG 62.010 -999.990 ... R4 1995 06 15 14 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124177 SMO 1995 05 24 00 30 00 2003-66 S co CCGG 60.290 -999.990 S.. R4 1995 07 07 09 44 00 -14.2500 -170.5700 60.30 42.00 18.30 124180 SMO 1995 05 24 00 30 00 2004-66 S co CCGG 61.050 -999.990 S.. R4 1995 07 07 10 00 00 -14.2500 -170.5700 60.30 42.00 18.30 124181 SMO 1995 06 09 23 40 00 1245-91 D co CCGG 58.060 -999.990 ... R4 1995 06 15 13 15 00 -14.2500 -170.5700 47.00 42.00 5.00 124184 SMO 1995 06 09 23 40 00 1246-91 D co CCGG 60.560 -999.990 ... R4 1995 06 15 13 31 00 -14.2500 -170.5700 47.00 42.00 5.00 124185 SMO 1995 06 09 23 40 00 513-91 P co CCGG 58.560 -999.990 ... R4 1995 06 15 12 42 00 -14.2500 -170.5700 47.00 42.00 5.00 124182 SMO 1995 06 09 23 40 00 514-91 P co CCGG 58.490 -999.990 ... R4 1995 06 15 12 59 00 -14.2500 -170.5700 47.00 42.00 5.00 124183 SMO 1995 06 10 01 20 00 2037-66 S co CCGG 55.180 -999.990 S.. R4 1995 07 07 09 11 00 -14.2500 -170.5700 60.30 42.00 18.30 124186 SMO 1995 06 10 01 20 00 2038-66 S co CCGG 55.420 -999.990 S.. R4 1995 07 07 09 27 00 -14.2500 -170.5700 60.30 42.00 18.30 124187 SMO 1995 06 13 22 15 00 2267-66 S co CCGG 58.950 -999.990 S.. R4 1995 07 21 15 14 00 -14.2500 -170.5700 60.30 42.00 18.30 124188 SMO 1995 06 13 22 15 00 2268-66 S co CCGG 57.800 -999.990 S.. R4 1995 07 21 15 30 00 -14.2500 -170.5700 60.30 42.00 18.30 124189 SMO 1995 06 13 22 40 00 203-91 P co CCGG 57.520 -999.990 ... R4 1995 06 26 12 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124190 SMO 1995 06 13 22 40 00 204-91 P co CCGG 58.800 -999.990 ... R4 1995 06 26 12 42 00 -14.2500 -170.5700 47.00 42.00 5.00 124191 SMO 1995 06 13 22 40 00 376-91 D co CCGG 59.150 -999.990 ... R4 1995 06 26 13 17 00 -14.2500 -170.5700 47.00 42.00 5.00 124192 SMO 1995 06 27 21 20 00 501-91 D co CCGG 58.600 -999.990 ... R4 1995 08 02 08 29 00 -14.2500 -170.5700 47.00 42.00 5.00 124193 SMO 1995 06 27 21 20 00 502-91 D co CCGG 58.380 -999.990 ... R4 1995 08 02 08 46 00 -14.2500 -170.5700 47.00 42.00 5.00 124194 SMO 1995 06 27 21 20 00 823-91 P co CCGG 57.560 -999.990 ... R4 1995 08 02 09 02 00 -14.2500 -170.5700 47.00 42.00 5.00 124195 SMO 1995 06 27 21 20 00 824-91 P co CCGG 58.320 -999.990 ... R4 1995 08 02 09 18 00 -14.2500 -170.5700 47.00 42.00 5.00 124196 SMO 1995 06 27 22 30 00 2001-66 S co CCGG 55.920 -999.990 S.. R4 1995 07 21 16 19 00 -14.2500 -170.5700 60.30 42.00 18.30 124197 SMO 1995 06 27 22 30 00 2002-66 S co CCGG 59.020 -999.990 S.. R4 1995 07 21 16 35 00 -14.2500 -170.5700 60.30 42.00 18.30 124198 SMO 1995 07 05 21 20 00 2317-66 S co CCGG 57.690 -999.990 S.. R4 1995 08 02 14 16 00 -14.2500 -170.5700 60.30 42.00 18.30 124199 SMO 1995 07 05 21 20 00 2318-66 S co CCGG 58.080 -999.990 S.. R4 1995 08 02 14 32 00 -14.2500 -170.5700 60.30 42.00 18.30 124200 SMO 1995 07 05 22 00 00 161-91 P co CCGG 62.190 -999.990 P.. R4 1995 07 21 10 18 00 -14.2500 -170.5700 47.00 42.00 5.00 124201 SMO 1995 07 05 22 00 00 162-91 P co CCGG 59.010 -999.990 P.. R4 1995 07 21 10 35 00 -14.2500 -170.5700 47.00 42.00 5.00 124202 SMO 1995 07 05 22 00 00 307-91 D co CCGG 61.360 -999.990 ... R4 1995 07 20 16 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124203 SMO 1995 07 05 22 00 00 308-91 D co CCGG 59.430 -999.990 ... R4 1995 07 20 16 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124204 SMO 1995 07 10 22 25 00 361-91 P co CCGG 62.180 -999.990 ... R7 1995 08 15 15 29 00 -14.2500 -170.5700 47.00 42.00 5.00 124205 SMO 1995 07 10 22 25 00 362-91 P co CCGG 61.480 -999.990 ... R7 1995 08 15 15 45 00 -14.2500 -170.5700 47.00 42.00 5.00 124206 SMO 1995 07 10 22 25 00 545-91 D co CCGG 60.880 -999.990 ... R7 1995 08 15 16 35 00 -14.2500 -170.5700 47.00 42.00 5.00 124207 SMO 1995 07 10 22 25 00 546-91 D co CCGG 61.120 -999.990 ... R7 1995 08 15 16 51 00 -14.2500 -170.5700 47.00 42.00 5.00 124208 SMO 1995 07 11 01 38 00 2051-66 S co CCGG 57.340 -999.990 S.. R4 1995 08 02 12 31 00 -14.2500 -170.5700 60.30 42.00 18.30 124209 SMO 1995 07 11 01 38 00 2052-66 S co CCGG 57.620 -999.990 S.. R4 1995 08 02 12 47 00 -14.2500 -170.5700 60.30 42.00 18.30 124210 SMO 1995 07 21 22 35 00 227-91 P co CCGG 63.270 -999.990 ... R7 1995 08 14 10 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124211 SMO 1995 07 21 22 35 00 228-91 P co CCGG 62.450 -999.990 ... R7 1995 08 14 10 52 00 -14.2500 -170.5700 47.00 42.00 5.00 124212 SMO 1995 07 21 22 35 00 505-91 D co CCGG 63.790 -999.990 ... R7 1995 08 14 11 08 00 -14.2500 -170.5700 47.00 42.00 5.00 124213 SMO 1995 07 21 22 35 00 506-91 D co CCGG 60.950 -999.990 ... R7 1995 08 14 11 25 00 -14.2500 -170.5700 47.00 42.00 5.00 124214 SMO 1995 07 21 23 40 00 2309-66 S co CCGG 61.490 -999.990 S.. R7 1995 08 22 09 07 00 -14.2500 -170.5700 60.30 42.00 18.30 124215 SMO 1995 07 21 23 40 00 2310-66 S co CCGG 61.610 -999.990 S.. R7 1995 08 22 09 23 00 -14.2500 -170.5700 60.30 42.00 18.30 124216 SMO 1995 08 02 23 15 00 455-91 D co CCGG 63.320 -999.990 ... R7 1995 08 22 10 11 00 -14.2500 -170.5700 47.00 42.00 5.00 124217 SMO 1995 08 02 23 15 00 456-91 D co CCGG 63.500 -999.990 ... R7 1995 08 22 10 28 00 -14.2500 -170.5700 47.00 42.00 5.00 124218 SMO 1995 08 02 23 15 00 593-91 P co CCGG 63.730 -999.990 ... R7 1995 08 21 16 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124219 SMO 1995 08 02 23 15 00 594-91 P co CCGG 63.410 -999.990 ... R7 1995 08 21 16 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124220 SMO 1995 08 03 02 10 00 2093-66 S co CCGG 61.100 -999.990 S.. R7 1995 08 22 08 35 00 -14.2500 -170.5700 60.30 42.00 18.30 124221 SMO 1995 08 03 02 10 00 2094-66 S co CCGG 62.330 -999.990 S.. R7 1995 08 22 08 51 00 -14.2500 -170.5700 60.30 42.00 18.30 124222 SMO 1995 08 09 21 45 00 2325-66 S co CCGG 68.020 -999.990 S.. R7 1995 09 14 13 10 00 -14.2500 -170.5700 60.30 42.00 18.30 124223 SMO 1995 08 09 21 45 00 2326-66 S co CCGG 67.190 -999.990 S.. R7 1995 09 14 13 26 00 -14.2500 -170.5700 60.30 42.00 18.30 124224 SMO 1995 08 09 23 18 00 499-91 D co CCGG 66.360 -999.990 ... R7 1995 08 24 10 55 00 -14.2500 -170.5700 47.00 42.00 5.00 124225 SMO 1995 08 09 23 18 00 500-91 D co CCGG 66.690 -999.990 ... R7 1995 08 24 11 11 00 -14.2500 -170.5700 47.00 42.00 5.00 124226 SMO 1995 08 09 23 20 00 51-91 P co CCGG 67.220 -999.990 ... R7 1995 08 24 09 14 00 -14.2500 -170.5700 47.00 42.00 5.00 124227 SMO 1995 08 09 23 20 00 52-91 P co CCGG 66.520 -999.990 ... R7 1995 08 24 09 30 00 -14.2500 -170.5700 47.00 42.00 5.00 124228 SMO 1995 08 15 00 20 00 201-91 P co CCGG 64.100 -999.990 ... R7 1995 09 15 10 42 00 -14.2500 -170.5700 47.00 42.00 5.00 124231 SMO 1995 08 15 00 20 00 202-91 P co CCGG 63.700 -999.990 ... R7 1995 09 15 10 59 00 -14.2500 -170.5700 47.00 42.00 5.00 124232 SMO 1995 08 15 00 20 00 59-91 D co CCGG 65.410 -999.990 ... R7 1995 09 15 10 10 00 -14.2500 -170.5700 47.00 42.00 5.00 124229 SMO 1995 08 15 00 20 00 60-91 D co CCGG 64.310 -999.990 ... R7 1995 09 15 10 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124230 SMO 1995 08 15 02 10 00 2057-66 S co CCGG 62.370 -999.990 S.. R7 1995 09 14 12 38 00 -14.2500 -170.5700 60.30 42.00 18.30 124233 SMO 1995 08 15 02 10 00 2058-66 S co CCGG 63.570 -999.990 S.. R7 1995 09 14 12 54 00 -14.2500 -170.5700 60.30 42.00 18.30 124234 SMO 1995 08 29 22 20 00 365-91 D co CCGG 63.410 -999.990 ... R7 1995 09 15 08 58 00 -14.2500 -170.5700 47.00 42.00 5.00 124237 SMO 1995 08 29 22 20 00 366-91 D co CCGG 62.350 -999.990 ... R7 1995 09 15 09 14 00 -14.2500 -170.5700 47.00 42.00 5.00 124238 SMO 1995 08 29 22 20 00 55-91 P co CCGG 62.820 -999.990 ... R7 1995 09 15 08 25 00 -14.2500 -170.5700 47.00 42.00 5.00 124235 SMO 1995 08 29 22 20 00 56-91 P co CCGG 62.780 -999.990 ... R7 1995 09 15 08 42 00 -14.2500 -170.5700 47.00 42.00 5.00 124236 SMO 1995 08 30 00 25 00 2061-66 S co CCGG 58.440 -999.990 S.. R7 1995 09 28 17 04 00 -14.2500 -170.5700 60.30 42.00 18.30 124239 SMO 1995 08 30 00 25 00 2062-66 S co CCGG 57.790 -999.990 S.. R7 1995 09 28 17 20 00 -14.2500 -170.5700 60.30 42.00 18.30 124240 SMO 1995 09 06 22 30 00 2207-66 S co CCGG 72.630 -999.990 S.. R7 1995 09 28 16 32 00 -14.2500 -170.5700 60.30 42.00 18.30 124241 SMO 1995 09 06 22 30 00 2208-66 S co CCGG 72.670 -999.990 S.. R7 1995 09 28 16 48 00 -14.2500 -170.5700 60.30 42.00 18.30 124242 SMO 1995 09 06 23 15 00 1417-91 D co CCGG 77.150 -999.990 ... R7 1995 09 28 15 59 00 -14.2500 -170.5700 47.00 42.00 5.00 124245 SMO 1995 09 06 23 15 00 1418-91 D co CCGG 76.630 -999.990 ... R7 1995 09 28 16 16 00 -14.2500 -170.5700 47.00 42.00 5.00 124246 SMO 1995 09 06 23 15 00 839-91 P co CCGG 75.490 -999.990 ... R7 1995 09 29 12 53 00 -14.2500 -170.5700 47.00 42.00 5.00 124243 SMO 1995 09 06 23 15 00 840-91 P co CCGG 75.160 -999.990 ... R7 1995 09 29 13 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124244 SMO 1995 09 11 23 40 00 169-91 D co CCGG 85.450 -999.990 ... R7 1995 09 22 11 55 00 -14.2500 -170.5700 47.00 42.00 5.00 124247 SMO 1995 09 11 23 40 00 170-91 D co CCGG 85.510 -999.990 ... R7 1995 09 22 12 11 00 -14.2500 -170.5700 47.00 42.00 5.00 124248 SMO 1995 09 11 23 40 00 191-91 P co CCGG 84.970 -999.990 ... R7 1995 09 22 11 22 00 -14.2500 -170.5700 47.00 42.00 5.00 124249 SMO 1995 09 11 23 40 00 192-91 P co CCGG 84.230 -999.990 ... R7 1995 09 22 11 39 00 -14.2500 -170.5700 47.00 42.00 5.00 124250 SMO 1995 09 12 02 30 00 2365-66 S co CCGG 81.830 -999.990 S.. R7 1995 10 04 15 24 00 -14.2500 -170.5700 60.30 42.00 18.30 124251 SMO 1995 09 12 02 30 00 2366-66 S co CCGG 81.540 -999.990 S.. R7 1995 10 04 15 40 00 -14.2500 -170.5700 60.30 42.00 18.30 124252 SMO 1995 09 19 23 30 00 293-91 D co CCGG 68.580 -999.990 ... R7 1995 09 29 18 48 00 -14.2500 -170.5700 47.00 42.00 5.00 124253 SMO 1995 09 19 23 30 00 294-91 D co CCGG 68.870 -999.990 ... R7 1995 09 29 19 04 00 -14.2500 -170.5700 47.00 42.00 5.00 124254 SMO 1995 09 19 23 30 00 685-91 P co CCGG 70.450 -999.990 ... R7 1995 09 29 19 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124255 SMO 1995 09 19 23 30 00 686-91 P co CCGG 69.960 -999.990 ... R7 1995 09 29 19 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124256 SMO 1995 09 20 00 25 00 2103-66 S co CCGG 67.540 -999.990 S.. R7 1995 10 04 15 56 00 -14.2500 -170.5700 60.30 42.00 18.30 124257 SMO 1995 09 20 00 25 00 2104-66 S co CCGG 66.400 -999.990 S.. R7 1995 10 04 16 12 00 -14.2500 -170.5700 60.30 42.00 18.30 124258 SMO 1995 09 28 00 10 00 1157-91 P co CCGG 94.920 -999.990 .X. R7 1995 10 02 15 12 00 -14.2500 -170.5700 47.00 42.00 5.00 124261 SMO 1995 09 28 00 10 00 1158-91 P co CCGG 95.780 -999.990 .X. R7 1995 10 02 15 29 00 -14.2500 -170.5700 47.00 42.00 5.00 124262 SMO 1995 09 28 00 10 00 305-91 D co CCGG 94.740 -999.990 .X. R7 1995 10 02 13 35 00 -14.2500 -170.5700 47.00 42.00 5.00 124259 SMO 1995 09 28 00 10 00 306-91 D co CCGG 95.370 -999.990 .X. R7 1995 10 02 13 52 00 -14.2500 -170.5700 47.00 42.00 5.00 124260 SMO 1995 09 28 02 15 00 2329-66 S co CCGG 91.270 -999.990 S.. R7 1995 10 13 14 21 00 -14.2500 -170.5700 60.30 42.00 18.30 124263 SMO 1995 09 28 02 15 00 2330-66 S co CCGG 92.260 -999.990 S.. R7 1995 10 13 14 37 00 -14.2500 -170.5700 60.30 42.00 18.30 124264 SMO 1995 10 03 23 30 00 2037-66 S co CCGG 89.060 -999.990 S.. R7 1995 10 13 12 41 00 -14.2500 -170.5700 60.30 42.00 18.30 124265 SMO 1995 10 03 23 30 00 2038-66 S co CCGG 89.060 -999.990 S.. R7 1995 10 13 12 57 00 -14.2500 -170.5700 60.30 42.00 18.30 124266 SMO 1995 10 04 00 30 00 1255-91 D co CCGG 91.500 -999.990 ... R7 1995 10 13 10 58 00 -14.2500 -170.5700 47.00 42.00 5.00 124269 SMO 1995 10 04 00 30 00 1256-91 D co CCGG 90.940 -999.990 ... R7 1995 10 13 11 14 00 -14.2500 -170.5700 47.00 42.00 5.00 124270 SMO 1995 10 04 00 30 00 343-91 P co CCGG 90.640 -999.990 ... R7 1995 10 13 10 25 00 -14.2500 -170.5700 47.00 42.00 5.00 124267 SMO 1995 10 04 00 30 00 344-91 P co CCGG 90.390 -999.990 ... R7 1995 10 13 10 42 00 -14.2500 -170.5700 47.00 42.00 5.00 124268 SMO 1995 10 10 00 50 00 27-91 D co CCGG 88.050 -999.990 ... R7 1995 10 18 12 06 00 -14.2500 -170.5700 47.00 42.00 5.00 124271 SMO 1995 10 10 00 50 00 28-91 D co CCGG 87.720 -999.990 ... R7 1995 10 18 12 23 00 -14.2500 -170.5700 47.00 42.00 5.00 124272 SMO 1995 10 10 00 50 00 479-91 P co CCGG 91.340 -999.990 ... R7 1995 10 18 14 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124273 SMO 1995 10 10 00 50 00 480-91 P co CCGG 89.860 -999.990 ... R7 1995 10 18 14 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124274 SMO 1995 10 10 02 20 00 2267-66 S co CCGG 85.570 -999.990 S.. R7 1995 11 07 11 56 00 -14.2500 -170.5700 60.30 42.00 18.30 124275 SMO 1995 10 10 02 20 00 2268-66 S co CCGG 86.230 -999.990 S.. R7 1995 11 07 12 12 00 -14.2500 -170.5700 60.30 42.00 18.30 124276 SMO 1995 10 23 23 30 00 1301-91 D co CCGG 72.830 -999.990 ... R7 1995 11 22 12 29 00 -14.2500 -170.5700 47.00 42.00 5.00 124279 SMO 1995 10 23 23 30 00 1302-91 D co CCGG 72.940 -999.990 ... R7 1995 11 22 12 45 00 -14.2500 -170.5700 47.00 42.00 5.00 124280 SMO 1995 10 23 23 30 00 591-91 P co CCGG 74.290 -999.990 ... R7 1995 11 22 11 56 00 -14.2500 -170.5700 47.00 42.00 5.00 124277 SMO 1995 10 23 23 30 00 592-91 P co CCGG 72.780 -999.990 ... R7 1995 11 22 12 12 00 -14.2500 -170.5700 47.00 42.00 5.00 124278 SMO 1995 10 24 02 10 00 2227-66 S co CCGG 71.000 -999.990 S.. R7 1995 11 07 12 28 00 -14.2500 -170.5700 60.30 42.00 18.30 124281 SMO 1995 10 24 02 10 00 2228-66 S co CCGG 70.240 -999.990 S.. R7 1995 11 07 12 44 00 -14.2500 -170.5700 60.30 42.00 18.30 124282 SMO 1995 10 30 23 50 00 457-91 P co CCGG 77.980 -999.990 ... R7 1995 11 15 13 05 00 -14.2500 -170.5700 47.00 42.00 5.00 124283 SMO 1995 10 30 23 50 00 458-91 P co CCGG 78.110 -999.990 ... R7 1995 11 15 13 21 00 -14.2500 -170.5700 47.00 42.00 5.00 124284 SMO 1995 10 30 23 50 00 637-91 D co CCGG 77.090 -999.990 ... R7 1995 11 15 13 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124285 SMO 1995 10 30 23 50 00 638-91 D co CCGG 76.590 -999.990 ... R7 1995 11 15 13 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124286 SMO 1995 10 31 01 15 00 2225-66 S co CCGG 79.000 -999.990 S.. R7 1995 11 27 12 46 00 -14.2500 -170.5700 60.30 42.00 18.30 124287 SMO 1995 10 31 01 15 00 2226-66 S co CCGG 90.280 -999.990 S.. R7 1995 11 27 13 02 00 -14.2500 -170.5700 60.30 42.00 18.30 124288 SMO 1995 11 08 23 15 00 1415-91 P co CCGG 78.310 -999.990 ... R7 1995 11 29 09 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124291 SMO 1995 11 08 23 15 00 1416-91 P co CCGG 79.710 -999.990 ... R7 1995 11 29 10 10 00 -14.2500 -170.5700 47.00 42.00 5.00 124292 SMO 1995 11 08 23 15 00 75-91 D co CCGG 77.160 -999.990 ... R7 1995 11 29 10 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124289 SMO 1995 11 08 23 15 00 76-91 D co CCGG 76.880 -999.990 ... R7 1995 11 29 10 43 00 -14.2500 -170.5700 47.00 42.00 5.00 124290 SMO 1995 11 09 00 40 00 2367-66 S co CCGG 75.570 -999.990 S.. R7 1995 11 27 13 18 00 -14.2500 -170.5700 60.30 42.00 18.30 124293 SMO 1995 11 09 00 40 00 2368-66 S co CCGG 74.740 -999.990 S.. R7 1995 11 27 13 34 00 -14.2500 -170.5700 60.30 42.00 18.30 124294 SMO 1995 11 15 22 30 00 1417-91 P co CCGG 68.200 -999.990 ... R7 1995 11 28 14 16 00 -14.2500 -170.5700 47.00 42.00 5.00 124297 SMO 1995 11 15 22 30 00 59-91 D co CCGG 67.810 -999.990 ... R7 1995 11 28 15 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124295 SMO 1995 11 15 22 30 00 60-91 D co CCGG 68.310 -999.990 ... R7 1995 11 28 15 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124296 SMO 1995 11 16 01 15 00 2325-66 S co CCGG 76.310 -999.990 S.. R7 1996 01 26 15 56 00 -14.2500 -170.5700 60.30 42.00 18.30 124299 SMO 1995 11 16 01 15 00 2326-66 S co CCGG 73.240 -999.990 S.. R7 1996 01 26 16 12 00 -14.2500 -170.5700 60.30 42.00 18.30 124300 SMO 1995 11 22 23 10 00 101-91 P co CCGG 68.970 -999.990 ... R7 1995 12 07 10 22 00 -14.2500 -170.5700 47.00 42.00 5.00 124301 SMO 1995 11 22 23 10 00 102-91 P co CCGG 66.480 -999.990 ... R7 1995 12 07 10 38 00 -14.2500 -170.5700 47.00 42.00 5.00 124302 SMO 1995 11 22 23 10 00 543-91 D co CCGG 68.140 -999.990 ... R7 1995 12 07 13 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124303 SMO 1995 11 22 23 10 00 544-91 D co CCGG 65.850 -999.990 ... R7 1995 12 07 13 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124304 SMO 1995 12 06 01 10 00 1339-91 D co CCGG 67.190 -999.990 ... R7 1996 01 09 18 08 00 -14.2500 -170.5700 47.00 42.00 5.00 124307 SMO 1995 12 06 01 10 00 1340-91 D co CCGG 65.880 -999.990 ... R7 1996 01 09 18 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124308 SMO 1995 12 06 01 10 00 143-91 P co CCGG 68.890 -999.990 ... R7 1996 01 09 18 40 00 -14.2500 -170.5700 47.00 42.00 5.00 124305 SMO 1995 12 06 01 10 00 144-91 P co CCGG 68.000 -999.990 ... R7 1996 01 09 18 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124306 SMO 1995 12 26 23 10 00 1119-91 P co CCGG 65.300 -999.990 ... R7 1996 01 18 13 23 00 -14.2500 -170.5700 47.00 42.00 5.00 124311 SMO 1995 12 26 23 10 00 621-91 D co CCGG 63.840 -999.990 ... R7 1996 01 18 14 45 00 -14.2500 -170.5700 47.00 42.00 5.00 124309 SMO 1995 12 26 23 10 00 622-91 D co CCGG 64.310 -999.990 ... R7 1996 01 18 15 02 00 -14.2500 -170.5700 47.00 42.00 5.00 124310 SMO 1995 12 27 01 50 00 2057-66 S co CCGG 62.150 -999.990 S.. R7 1996 01 26 15 24 00 -14.2500 -170.5700 60.30 42.00 18.30 124313 SMO 1995 12 27 01 50 00 2058-66 S co CCGG 62.590 -999.990 S.. R7 1996 01 26 15 40 00 -14.2500 -170.5700 60.30 42.00 18.30 124314 SMO 1996 01 08 23 45 00 1473-91 P co CCGG 65.010 -999.990 ... R7 1996 01 17 19 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124315 SMO 1996 01 08 23 45 00 1474-91 P co CCGG 65.030 -999.990 ... R7 1996 01 17 19 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124316 SMO 1996 01 08 23 45 00 1497-91 D co CCGG 64.750 -999.990 ... R7 1996 01 17 16 38 00 -14.2500 -170.5700 47.00 42.00 5.00 124317 SMO 1996 01 08 23 45 00 1498-91 D co CCGG 64.350 -999.990 ... R7 1996 01 17 16 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124318 SMO 1996 01 16 00 50 00 6737-66 D co CCGG 70.170 -999.990 ... R7 1996 01 26 09 38 00 -14.2500 -170.5700 47.00 42.00 5.00 124321 SMO 1996 01 16 00 50 00 6738-66 D co CCGG 71.110 -999.990 ... R7 1996 01 26 09 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124322 SMO 1996 01 16 00 50 00 6757-66 P co CCGG 70.350 -999.990 ... R7 1996 01 26 09 06 00 -14.2500 -170.5700 47.00 42.00 5.00 124323 SMO 1996 01 16 00 50 00 6758-66 P co CCGG 71.300 -999.990 ... R7 1996 01 26 09 22 00 -14.2500 -170.5700 47.00 42.00 5.00 124324 SMO 1996 01 24 01 15 00 271-91 P co CCGG 70.070 -999.990 ... R7 1996 02 07 20 47 00 -14.2500 -170.5700 47.00 42.00 5.00 124327 SMO 1996 01 24 01 15 00 272-91 P co CCGG 68.010 -999.990 ... R7 1996 02 07 21 04 00 -14.2500 -170.5700 47.00 42.00 5.00 124328 SMO 1996 01 24 01 15 00 353-91 D co CCGG 68.400 -999.990 ... R7 1996 02 08 10 46 00 -14.2500 -170.5700 47.00 42.00 5.00 124329 SMO 1996 01 24 01 15 00 354-91 D co CCGG 68.410 -999.990 ... R7 1996 02 08 11 02 00 -14.2500 -170.5700 47.00 42.00 5.00 124330 SMO 1996 01 24 04 15 00 2223-66 S co CCGG 69.960 -999.990 S.. R7 1996 03 20 08 23 00 -14.2500 -170.5700 60.30 42.00 18.30 124331 SMO 1996 01 24 04 15 00 2224-66 S co CCGG 78.400 -999.990 S.. R7 1996 03 20 08 39 00 -14.2500 -170.5700 60.30 42.00 18.30 124332 SMO 1996 01 31 01 35 00 1163-91 P co CCGG 63.840 -999.990 ... R7 1996 02 08 10 13 00 -14.2500 -170.5700 47.00 42.00 5.00 124333 SMO 1996 01 31 01 35 00 1164-91 P co CCGG 63.880 -999.990 ... R7 1996 02 08 10 30 00 -14.2500 -170.5700 47.00 42.00 5.00 124334 SMO 1996 01 31 01 35 00 1191-91 D co CCGG 63.150 -999.990 ... R7 1996 02 08 09 08 00 -14.2500 -170.5700 47.00 42.00 5.00 124335 SMO 1996 01 31 01 35 00 1192-91 D co CCGG 62.740 -999.990 ... R7 1996 02 08 09 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124336 SMO 1996 01 31 02 35 00 2053-66 S co CCGG 61.780 -999.990 S.. R7 1996 03 19 17 34 00 -14.2500 -170.5700 60.30 42.00 18.30 124337 SMO 1996 01 31 02 35 00 2054-66 S co CCGG 60.960 -999.990 S.. R7 1996 03 19 17 50 00 -14.2500 -170.5700 60.30 42.00 18.30 124338 SMO 1996 02 20 23 50 00 309-91 D co CCGG 81.780 -999.990 ... R7 1996 03 19 13 01 00 -14.2500 -170.5700 47.00 42.00 5.00 124340 SMO 1996 02 20 23 50 00 310-91 D co CCGG 79.820 -999.990 ... R7 1996 03 19 13 17 00 -14.2500 -170.5700 47.00 42.00 5.00 124341 SMO 1996 02 20 23 50 00 77-91 P co CCGG 82.810 -999.990 .X. R7 1996 03 19 11 50 00 -14.2500 -170.5700 47.00 42.00 5.00 124339 SMO 1996 02 21 01 20 00 2003-66 S co CCGG 82.090 -999.990 S.. R7 1996 03 19 15 54 00 -14.2500 -170.5700 60.30 42.00 18.30 124342 SMO 1996 02 21 01 20 00 2004-66 S co CCGG 81.700 -999.990 S.. R7 1996 03 19 16 10 00 -14.2500 -170.5700 60.30 42.00 18.30 124343 SMO 1996 02 29 02 30 00 1339-91 P co CCGG 66.380 -999.990 ... R7 1996 03 19 11 18 00 -14.2500 -170.5700 47.00 42.00 5.00 124346 SMO 1996 02 29 02 30 00 1340-91 P co CCGG 65.450 -999.990 ... R7 1996 03 19 11 34 00 -14.2500 -170.5700 47.00 42.00 5.00 124347 SMO 1996 02 29 02 30 00 365-91 D co CCGG 63.900 -999.990 ... R7 1996 03 19 12 23 00 -14.2500 -170.5700 47.00 42.00 5.00 124344 SMO 1996 02 29 02 30 00 366-91 D co CCGG 63.740 -999.990 ... R7 1996 03 19 12 39 00 -14.2500 -170.5700 47.00 42.00 5.00 124345 SMO 1996 03 05 01 00 00 1789-91 D co CCGG 61.780 -999.990 ... R7 1996 04 02 16 03 00 -14.2500 -170.5700 47.00 42.00 5.00 124348 SMO 1996 03 05 01 00 00 1790-91 D co CCGG 61.180 -999.990 ... R7 1996 04 02 16 19 00 -14.2500 -170.5700 47.00 42.00 5.00 124349 SMO 1996 03 05 01 00 00 1791-91 P co CCGG 61.940 -999.990 ... R7 1996 04 02 15 30 00 -14.2500 -170.5700 47.00 42.00 5.00 124350 SMO 1996 03 05 01 00 00 1792-91 P co CCGG 63.150 -999.990 ... R7 1996 04 02 15 47 00 -14.2500 -170.5700 47.00 42.00 5.00 124351 SMO 1996 03 05 02 10 00 2051-66 S co CCGG 60.580 -999.990 S.. R7 1996 03 19 15 22 00 -14.2500 -170.5700 60.30 42.00 18.30 124352 SMO 1996 03 05 02 10 00 2052-66 S co CCGG 60.870 -999.990 S.. R7 1996 03 19 15 38 00 -14.2500 -170.5700 60.30 42.00 18.30 124353 SMO 1996 03 20 23 30 00 313-91 D co CCGG 75.340 -999.990 .X. R7 1996 04 03 08 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124354 SMO 1996 03 20 23 30 00 314-91 D co CCGG 77.630 -999.990 .X. R7 1996 04 03 08 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124355 SMO 1996 03 20 23 30 00 465-91 P co CCGG 72.430 -999.990 ... R7 1996 04 03 08 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124356 SMO 1996 03 20 23 30 00 466-91 P co CCGG 70.180 -999.990 ... R7 1996 04 03 09 14 00 -14.2500 -170.5700 47.00 42.00 5.00 124357 SMO 1996 03 21 01 35 00 2367-66 S co CCGG 68.100 -999.990 S.. R7 1996 04 03 15 51 00 -14.2500 -170.5700 60.30 42.00 18.30 124358 SMO 1996 03 21 01 35 00 2368-66 S co CCGG 68.230 -999.990 S.. R7 1996 04 03 16 07 00 -14.2500 -170.5700 60.30 42.00 18.30 124359 SMO 1996 03 25 22 35 00 2225-66 S co CCGG 54.370 -999.990 S.. R7 1996 04 03 16 40 00 -14.2500 -170.5700 60.30 42.00 18.30 124360 SMO 1996 03 25 22 35 00 2226-66 S co CCGG 58.260 -999.990 S.. R7 1996 04 03 16 57 00 -14.2500 -170.5700 60.30 42.00 18.30 124361 SMO 1996 03 25 23 00 00 1637-91 D co CCGG 60.260 -999.990 ... R7 1996 04 10 13 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124362 SMO 1996 03 25 23 00 00 1638-91 D co CCGG 59.220 -999.990 ... R7 1996 04 10 13 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124363 SMO 1996 04 01 23 30 00 443-91 P co CCGG 55.960 -999.990 ... R7 1996 04 10 12 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124366 SMO 1996 04 01 23 30 00 444-91 P co CCGG 56.430 -999.990 ... R7 1996 04 10 12 52 00 -14.2500 -170.5700 47.00 42.00 5.00 124367 SMO 1996 04 01 23 30 00 71-91 D co CCGG 58.800 -999.990 ... R7 1996 04 10 14 13 00 -14.2500 -170.5700 47.00 42.00 5.00 124364 SMO 1996 04 01 23 30 00 72-91 D co CCGG 59.660 -999.990 ... R7 1996 04 10 14 30 00 -14.2500 -170.5700 47.00 42.00 5.00 124365 SMO 1996 04 02 01 00 00 2061-66 S co CCGG 55.240 -999.990 S.. R7 1996 04 16 15 33 00 -14.2500 -170.5700 60.30 42.00 18.30 124368 SMO 1996 04 02 01 00 00 2062-66 S co CCGG 55.210 -999.990 S.. R7 1996 04 16 15 50 00 -14.2500 -170.5700 60.30 42.00 18.30 124369 SMO 1996 04 08 22 15 00 199-91 D co CCGG 54.300 -999.990 ... R7 1996 04 15 14 07 00 -14.2500 -170.5700 47.00 42.00 5.00 124370 SMO 1996 04 08 22 15 00 200-91 D co CCGG 54.340 -999.990 ... R7 1996 04 15 14 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124371 SMO 1996 04 08 22 15 00 301-91 P co CCGG 51.170 -999.990 ... R7 1996 04 15 14 40 00 -14.2500 -170.5700 47.00 42.00 5.00 124372 SMO 1996 04 08 22 15 00 302-91 P co CCGG 51.200 -999.990 ... R7 1996 04 15 14 56 00 -14.2500 -170.5700 47.00 42.00 5.00 124373 SMO 1996 04 08 22 47 00 2093-66 S co CCGG 49.760 -999.990 S.. R7 1996 04 16 17 17 00 -14.2500 -170.5700 60.30 42.00 18.30 124374 SMO 1996 04 08 22 47 00 2094-66 S co CCGG 50.530 -999.990 S.. R7 1996 04 16 17 35 00 -14.2500 -170.5700 60.30 42.00 18.30 124375 SMO 1996 04 15 23 40 00 510-91 D co CCGG 57.970 -999.990 ... R7 1996 04 26 12 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124376 SMO 1996 04 15 23 40 00 703-91 P co CCGG 52.030 -999.990 ... R7 1996 04 26 11 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124377 SMO 1996 04 15 23 40 00 704-91 P co CCGG 51.100 -999.990 ... R7 1996 04 26 11 53 00 -14.2500 -170.5700 47.00 42.00 5.00 124378 SMO 1996 04 16 01 33 00 2297-66 S co CCGG 51.920 -999.990 S.. R7 1996 06 05 14 00 00 -14.2500 -170.5700 60.30 42.00 18.30 124379 SMO 1996 04 16 01 33 00 2298-66 S co CCGG 53.300 -999.990 S.. R7 1996 06 05 14 18 00 -14.2500 -170.5700 60.30 42.00 18.30 124380 SMO 1996 04 24 01 20 00 77-91 D co CCGG 57.630 -999.990 ... R7 1996 05 16 08 51 00 -14.2500 -170.5700 47.00 42.00 5.00 124381 SMO 1996 04 24 01 20 00 78-91 D co CCGG 56.720 -999.990 ... R7 1996 05 16 09 07 00 -14.2500 -170.5700 47.00 42.00 5.00 124382 SMO 1996 04 24 01 20 00 827-91 P co CCGG 54.830 -999.990 ... R7 1996 05 15 12 13 00 -14.2500 -170.5700 47.00 42.00 5.00 124383 SMO 1996 04 24 01 20 00 828-91 P co CCGG 53.780 -999.990 ... R7 1996 05 15 12 30 00 -14.2500 -170.5700 47.00 42.00 5.00 124384 SMO 1996 04 24 02 25 00 2057-66 S co CCGG 54.290 -999.990 S.. R7 1996 05 08 12 11 00 -14.2500 -170.5700 60.30 42.00 18.30 124385 SMO 1996 04 24 02 25 00 2058-66 S co CCGG 54.170 -999.990 S.. R7 1996 05 08 12 29 00 -14.2500 -170.5700 60.30 42.00 18.30 124386 SMO 1996 05 01 23 00 00 1335-91 P co CCGG 56.570 -999.990 ... R7 1996 05 08 13 56 00 -14.2500 -170.5700 47.00 42.00 5.00 124389 SMO 1996 05 01 23 00 00 1336-91 P co CCGG 56.750 -999.990 ... R7 1996 05 08 14 13 00 -14.2500 -170.5700 47.00 42.00 5.00 124390 SMO 1996 05 01 23 00 00 5-91 D co CCGG 59.660 -999.990 ... R7 1996 05 08 15 33 00 -14.2500 -170.5700 47.00 42.00 5.00 124387 SMO 1996 05 01 23 00 00 6-91 D co CCGG 61.140 -999.990 ... R7 1996 05 08 15 50 00 -14.2500 -170.5700 47.00 42.00 5.00 124388 SMO 1996 05 02 00 50 00 2087-66 S co CCGG 55.360 -999.990 S.. R7 1996 05 08 11 35 00 -14.2500 -170.5700 60.30 42.00 18.30 124391 SMO 1996 05 02 00 50 00 2088-66 S co CCGG 56.110 -999.990 S.. R7 1996 05 08 11 53 00 -14.2500 -170.5700 60.30 42.00 18.30 124392 SMO 1996 05 11 00 00 00 1731-91 P co CCGG 59.600 -999.990 ... R7 1996 06 03 15 06 00 -14.2500 -170.5700 47.00 42.00 5.00 124395 SMO 1996 05 11 00 00 00 1732-91 P co CCGG 59.440 -999.990 ... R7 1996 06 03 15 22 00 -14.2500 -170.5700 47.00 42.00 5.00 124396 SMO 1996 05 11 00 00 00 73-91 D co CCGG 62.200 -999.990 ... R7 1996 06 03 14 33 00 -14.2500 -170.5700 47.00 42.00 5.00 124393 SMO 1996 05 11 00 00 00 74-91 D co CCGG 61.440 -999.990 ... R7 1996 06 03 14 50 00 -14.2500 -170.5700 47.00 42.00 5.00 124394 SMO 1996 05 11 02 20 00 2229-66 S co CCGG 60.780 -999.990 S.. R7 1996 06 05 13 23 00 -14.2500 -170.5700 60.30 42.00 18.30 124397 SMO 1996 05 11 02 20 00 2230-66 S co CCGG 57.300 -999.990 S.. R7 1996 06 05 13 42 00 -14.2500 -170.5700 60.30 42.00 18.30 124398 SMO 1996 05 15 00 40 00 115-91 D co CCGG 52.430 -999.990 ... R7 1996 05 22 11 27 00 -14.2500 -170.5700 47.00 42.00 5.00 124399 SMO 1996 05 15 00 40 00 116-91 D co CCGG 51.250 -999.990 ... R7 1996 05 22 11 43 00 -14.2500 -170.5700 47.00 42.00 5.00 124400 SMO 1996 05 15 00 40 00 569-91 P co CCGG 50.480 -999.990 ... R7 1996 05 22 08 50 00 -14.2500 -170.5700 47.00 42.00 5.00 124401 SMO 1996 05 15 00 40 00 570-91 P co CCGG 49.870 -999.990 ... R7 1996 05 22 09 06 00 -14.2500 -170.5700 47.00 42.00 5.00 124402 SMO 1996 05 15 02 47 00 2038-66 S co CCGG 50.360 -999.990 S.. R7 1996 06 05 14 36 00 -14.2500 -170.5700 60.30 42.00 18.30 124403 SMO 1996 05 15 02 47 00 2310-66 S co CCGG 51.710 -999.990 S.. R7 1996 06 05 14 54 00 -14.2500 -170.5700 60.30 42.00 18.30 124404 SMO 1996 05 22 23 59 00 2037-66 S co CCGG 54.140 -999.990 S.. R7 1996 06 05 13 03 00 -14.2500 -170.5700 60.30 42.00 18.30 124405 SMO 1996 05 23 22 15 00 1331-91 P co CCGG 56.340 -999.990 ... R7 1996 05 31 14 21 00 -14.2500 -170.5700 47.00 42.00 5.00 124409 SMO 1996 05 23 22 15 00 1332-91 P co CCGG 56.940 -999.990 ... R7 1996 05 31 14 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124410 SMO 1996 05 23 22 15 00 301-91 D co CCGG 58.110 -999.990 ... R7 1996 05 31 12 39 00 -14.2500 -170.5700 47.00 42.00 5.00 124407 SMO 1996 05 23 22 15 00 302-91 D co CCGG 56.210 -999.990 ... R7 1996 05 31 12 55 00 -14.2500 -170.5700 47.00 42.00 5.00 124408 SMO 1996 05 28 22 50 00 1243-91 P co CCGG 58.060 -999.990 ... R7 1996 06 11 15 39 00 -14.2500 -170.5700 47.00 42.00 5.00 124413 SMO 1996 05 28 22 50 00 1244-91 P co CCGG 59.130 -999.990 ... R7 1996 06 11 15 55 00 -14.2500 -170.5700 47.00 42.00 5.00 124414 SMO 1996 05 28 22 50 00 231-91 D co CCGG 59.370 -999.990 ... R7 1996 06 11 16 11 00 -14.2500 -170.5700 47.00 42.00 5.00 124411 SMO 1996 05 28 22 50 00 232-91 D co CCGG 60.930 -999.990 ... R7 1996 06 11 16 28 00 -14.2500 -170.5700 47.00 42.00 5.00 124412 SMO 1996 05 29 00 45 00 2003-66 S co CCGG 58.230 -999.990 S.. R7 1996 06 18 10 55 00 -14.2500 -170.5700 60.30 42.00 18.30 124415 SMO 1996 05 29 00 45 00 2004-66 S co CCGG 58.550 -999.990 S.. R7 1996 06 18 11 13 00 -14.2500 -170.5700 60.30 42.00 18.30 124416 SMO 1996 06 03 23 00 00 113-91 D co CCGG 57.430 -999.990 ... R7 1996 06 13 09 42 00 -14.2500 -170.5700 47.00 42.00 5.00 124417 SMO 1996 06 03 23 00 00 114-91 D co CCGG 55.810 -999.990 ... R7 1996 06 13 09 58 00 -14.2500 -170.5700 47.00 42.00 5.00 124418 SMO 1996 06 03 23 00 00 663-91 P co CCGG 55.830 -999.990 ... R7 1996 06 13 09 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124419 SMO 1996 06 03 23 00 00 664-91 P co CCGG 54.590 -999.990 ... R7 1996 06 13 09 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124420 SMO 1996 06 04 00 11 00 2253-66 S co CCGG 54.780 -999.990 S.. R7 1996 06 18 11 30 00 -14.2500 -170.5700 60.30 42.00 18.30 124421 SMO 1996 06 04 00 11 00 2254-66 S co CCGG 56.010 -999.990 S.. R7 1996 06 18 11 48 00 -14.2500 -170.5700 60.30 42.00 18.30 124422 SMO 1996 06 10 23 00 00 207-91 D co CCGG 57.600 -999.990 ... R7 1996 06 18 12 16 00 -14.2500 -170.5700 47.00 42.00 5.00 124423 SMO 1996 06 10 23 00 00 208-91 D co CCGG 58.480 -999.990 ... R7 1996 06 18 12 33 00 -14.2500 -170.5700 47.00 42.00 5.00 124424 SMO 1996 06 10 23 00 00 267-91 P co CCGG 58.490 -999.990 ... R7 1996 06 18 15 55 00 -14.2500 -170.5700 47.00 42.00 5.00 124425 SMO 1996 06 10 23 00 00 268-91 P co CCGG 59.650 -999.990 ... R7 1996 06 18 16 11 00 -14.2500 -170.5700 47.00 42.00 5.00 124426 SMO 1996 06 11 00 10 00 2167-66 S co CCGG 61.630 -999.990 S.. R7 1996 07 02 08 45 00 -14.2500 -170.5700 60.30 42.00 18.30 124427 SMO 1996 06 11 00 10 00 2168-66 S co CCGG 62.440 -999.990 S.. R7 1996 07 02 09 03 00 -14.2500 -170.5700 60.30 42.00 18.30 124428 SMO 1996 06 18 23 00 00 1519-91 P co CCGG 58.580 -999.990 ... R7 1996 07 01 12 38 00 -14.2500 -170.5700 47.00 42.00 5.00 124431 SMO 1996 06 18 23 00 00 1520-91 P co CCGG 57.790 -999.990 ... R7 1996 07 01 12 55 00 -14.2500 -170.5700 47.00 42.00 5.00 124432 SMO 1996 06 18 23 00 00 49-91 D co CCGG 57.410 -999.990 P.. R7 1996 07 01 12 06 00 -14.2500 -170.5700 47.00 42.00 5.00 124429 SMO 1996 06 18 23 00 00 50-91 D co CCGG 62.400 -999.990 P.. R7 1996 07 01 12 22 00 -14.2500 -170.5700 47.00 42.00 5.00 124430 SMO 1996 06 19 01 08 00 2093-66 S co CCGG 58.050 -999.990 S.. R7 1996 07 01 16 19 00 -14.2500 -170.5700 60.30 42.00 18.30 124433 SMO 1996 06 19 01 08 00 2094-66 S co CCGG 56.850 -999.990 S.. R7 1996 07 01 16 37 00 -14.2500 -170.5700 60.30 42.00 18.30 124434 SMO 1996 06 24 23 00 00 1291-91 D co CCGG 61.730 -999.990 ... R7 1996 07 09 14 31 00 -14.2500 -170.5700 47.00 42.00 5.00 124435 SMO 1996 06 24 23 00 00 1292-91 D co CCGG 62.960 -999.990 ... R7 1996 07 09 14 47 00 -14.2500 -170.5700 47.00 42.00 5.00 124436 SMO 1996 06 24 23 00 00 1321-91 P co CCGG 59.630 -999.990 ... R7 1996 07 09 15 04 00 -14.2500 -170.5700 47.00 42.00 5.00 124437 SMO 1996 06 24 23 00 00 1322-91 P co CCGG 59.270 -999.990 ... R7 1996 07 09 15 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124438 SMO 1996 06 25 01 20 00 2313-66 S co CCGG 56.190 -999.990 S.. R7 1996 07 16 09 20 00 -14.2500 -170.5700 60.30 42.00 18.30 124439 SMO 1996 06 25 01 20 00 2314-66 S co CCGG 60.470 -999.990 S.. R7 1996 07 16 09 38 00 -14.2500 -170.5700 60.30 42.00 18.30 124440 SMO 1996 07 01 23 00 00 1043-91 D co CCGG 58.940 -999.990 ... R7 1996 07 16 15 01 00 -14.2500 -170.5700 47.00 42.00 5.00 124441 SMO 1996 07 01 23 00 00 1044-91 D co CCGG 60.130 -999.990 ... R7 1996 07 16 15 18 00 -14.2500 -170.5700 47.00 42.00 5.00 124442 SMO 1996 07 01 23 00 00 1057-91 P co CCGG 59.020 -999.990 ... R7 1996 07 16 15 40 00 -14.2500 -170.5700 47.00 42.00 5.00 124443 SMO 1996 07 01 23 00 00 1058-91 P co CCGG 59.120 -999.990 ... R7 1996 07 16 15 56 00 -14.2500 -170.5700 47.00 42.00 5.00 124444 SMO 1996 07 02 00 50 00 2209-66 S co CCGG -999.990 -999.990 *.. R7 1996 07 16 11 06 00 -14.2500 -170.5700 60.30 42.00 18.30 124445 SMO 1996 07 02 00 50 00 2210-66 S co CCGG 61.650 -999.990 S.. R7 1996 07 16 11 24 00 -14.2500 -170.5700 60.30 42.00 18.30 124446 SMO 1996 07 09 22 15 00 1371-91 P co CCGG 58.910 -999.990 ... R7 1996 07 19 12 34 00 -14.2500 -170.5700 47.00 42.00 5.00 124448 SMO 1996 07 09 22 15 00 1372-91 P co CCGG 60.210 -999.990 ... R7 1996 07 19 12 51 00 -14.2500 -170.5700 47.00 42.00 5.00 124449 SMO 1996 07 09 22 15 00 173-91 D co CCGG 61.380 -999.990 ... R7 1996 07 19 10 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124447 SMO 1996 07 15 23 15 00 345-91 D co CCGG 61.050 -999.990 ... R7 1996 07 31 15 35 00 -14.2500 -170.5700 47.00 42.00 5.00 124450 SMO 1996 07 15 23 15 00 346-91 D co CCGG 61.060 -999.990 ... R7 1996 07 31 15 51 00 -14.2500 -170.5700 47.00 42.00 5.00 124451 SMO 1996 07 15 23 15 00 463-91 P co CCGG 57.330 -999.990 ... R7 1996 07 31 13 58 00 -14.2500 -170.5700 47.00 42.00 5.00 124452 SMO 1996 07 15 23 15 00 464-91 P co CCGG 58.640 -999.990 ... R7 1996 07 31 14 14 00 -14.2500 -170.5700 47.00 42.00 5.00 124453 SMO 1996 07 16 00 33 00 2333-66 S co CCGG 62.410 -999.990 S.. R7 1996 08 01 09 04 00 -14.2500 -170.5700 60.30 42.00 18.30 124454 SMO 1996 07 16 00 33 00 2334-66 S co CCGG 57.270 -999.990 S.. R7 1996 08 01 09 23 00 -14.2500 -170.5700 60.30 42.00 18.30 124455 SMO 1996 07 22 23 00 00 543-91 D co CCGG 60.760 -999.990 ... R7 1996 08 05 16 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124456 SMO 1996 07 22 23 00 00 544-91 D co CCGG 59.760 -999.990 ... R7 1996 08 05 16 25 00 -14.2500 -170.5700 47.00 42.00 5.00 124457 SMO 1996 07 22 23 00 00 637-91 P co CCGG -999.990 -999.990 *.. R7 1996 08 05 14 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124458 SMO 1996 07 22 23 00 00 638-91 P co CCGG 56.970 -999.990 ... R7 1996 08 05 14 40 00 -14.2500 -170.5700 47.00 42.00 5.00 124459 SMO 1996 07 23 00 47 00 2207-66 S co CCGG 60.590 -999.990 S.. R7 1996 08 26 08 58 00 -14.2500 -170.5700 60.30 42.00 18.30 124460 SMO 1996 07 23 00 47 00 2208-66 S co CCGG 59.770 -999.990 S.. R7 1996 08 26 09 16 00 -14.2500 -170.5700 60.30 42.00 18.30 124461 SMO 1996 07 30 22 50 00 113-91 D co CCGG 62.080 -999.990 ... R7 1996 08 27 09 44 00 -14.2500 -170.5700 47.00 42.00 5.00 124462 SMO 1996 07 30 22 50 00 114-91 D co CCGG 61.250 -999.990 ... R7 1996 08 27 10 00 00 -14.2500 -170.5700 47.00 42.00 5.00 124463 SMO 1996 07 30 22 50 00 1441-91 P co CCGG 59.420 -999.990 ... R7 1996 08 27 10 17 00 -14.2500 -170.5700 47.00 42.00 5.00 124464 SMO 1996 07 30 22 50 00 1442-91 P co CCGG 58.440 -999.990 ... R7 1996 08 27 10 33 00 -14.2500 -170.5700 47.00 42.00 5.00 124465 SMO 1996 07 31 01 00 00 2087-66 S co CCGG 61.210 -999.990 S.. R7 1996 08 26 09 35 00 -14.2500 -170.5700 60.30 42.00 18.30 124466 SMO 1996 07 31 01 00 00 2088-66 S co CCGG 60.720 -999.990 S.. R7 1996 08 26 09 53 00 -14.2500 -170.5700 60.30 42.00 18.30 124467 SMO 1996 08 06 22 45 00 1256-91 D co CCGG 60.820 -999.990 ... R7 1996 08 14 13 11 00 -14.2500 -170.5700 47.00 42.00 5.00 124469 SMO 1996 08 06 22 45 00 1810-91 P co CCGG 58.600 -999.990 ... R7 1996 08 14 13 44 00 -14.2500 -170.5700 47.00 42.00 5.00 124470 SMO 1996 08 07 01 20 00 2326-66 S co CCGG 60.970 -999.990 S.. R7 1996 08 28 12 30 00 -14.2500 -170.5700 60.30 42.00 18.30 124471 SMO 1996 08 07 01 20 00 2328-66 S co CCGG 263.850 -999.990 S.C R7 1996 08 28 12 47 00 -14.2500 -170.5700 60.30 42.00 18.30 124472 SMO 1996 08 22 22 15 00 1519-91 P co CCGG 66.510 -999.990 ... R7 1996 08 28 14 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124475 SMO 1996 08 22 22 15 00 1520-91 P co CCGG 67.510 -999.990 ... R7 1996 08 28 14 25 00 -14.2500 -170.5700 47.00 42.00 5.00 124476 SMO 1996 08 22 22 15 00 471-91 D co CCGG 67.870 -999.990 ... R7 1996 08 28 13 03 00 -14.2500 -170.5700 47.00 42.00 5.00 124473 SMO 1996 08 22 22 15 00 472-91 D co CCGG 66.920 -999.990 ... R7 1996 08 28 13 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124474 SMO 1996 08 22 23 10 00 2019-66 S co CCGG 69.290 -999.990 S.. R7 1996 08 28 10 36 00 -14.2500 -170.5700 60.30 42.00 18.30 124477 SMO 1996 08 22 23 10 00 2020-66 S co CCGG 66.360 -999.990 S.. R7 1996 08 28 10 52 00 -14.2500 -170.5700 60.30 42.00 18.30 124478 SMO 1996 08 27 22 30 00 1033-91 D co CCGG 65.040 -999.990 ... R7 1996 09 10 13 15 00 -14.2500 -170.5700 47.00 42.00 5.00 124479 SMO 1996 08 27 22 30 00 1034-91 D co CCGG 64.300 -999.990 ... R7 1996 09 10 13 31 00 -14.2500 -170.5700 47.00 42.00 5.00 124480 SMO 1996 08 27 22 30 00 1036-91 P co CCGG 381.930 -999.990 N.C R7 1996 09 10 16 07 00 -14.2500 -170.5700 47.00 42.00 5.00 124481 SMO 1996 08 27 23 56 00 2003-66 S co CCGG 62.370 -999.990 S.. R7 1996 09 24 11 57 00 -14.2500 -170.5700 60.30 42.00 18.30 124482 SMO 1996 08 27 23 56 00 2004-66 S co CCGG 62.010 -999.990 S.. R7 1996 09 24 12 15 00 -14.2500 -170.5700 60.30 42.00 18.30 124483 SMO 1996 09 03 22 40 00 1251-91 P co CCGG 340.370 -999.990 N.C R7 1996 09 12 16 19 00 -14.2500 -170.5700 47.00 42.00 5.00 124486 SMO 1996 09 03 22 40 00 497-91 D co CCGG 67.660 -999.990 P.. R7 1996 09 12 10 15 00 -14.2500 -170.5700 47.00 42.00 5.00 124484 SMO 1996 09 03 22 40 00 498-91 D co CCGG 64.670 -999.990 P.. R7 1996 09 12 10 32 00 -14.2500 -170.5700 47.00 42.00 5.00 124485 SMO 1996 09 04 00 00 00 2318-66 S co CCGG 67.360 -999.990 S.. R7 1996 09 19 16 45 00 -14.2500 -170.5700 60.30 42.00 18.30 124487 SMO 1996 09 10 22 40 00 2037-91 D co CCGG 67.410 -999.990 ... R7 1996 09 19 14 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124490 SMO 1996 09 10 22 40 00 2038-91 D co CCGG 66.410 -999.990 ... R7 1996 09 19 14 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124491 SMO 1996 09 10 22 40 00 641-91 P co CCGG 223.710 -999.990 P.. R7 1996 09 19 13 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124488 SMO 1996 09 10 22 40 00 642-91 P co CCGG 297.000 -999.990 P.C R7 1996 09 19 13 53 00 -14.2500 -170.5700 47.00 42.00 5.00 124489 SMO 1996 09 10 23 35 00 2151-66 S co CCGG 66.580 -999.990 S.. R7 1996 09 19 16 09 00 -14.2500 -170.5700 60.30 42.00 18.30 124492 SMO 1996 09 10 23 35 00 2152-66 S co CCGG 67.450 -999.990 S.. R7 1996 09 19 16 27 00 -14.2500 -170.5700 60.30 42.00 18.30 124493 SMO 1996 09 17 00 45 00 1815-91 D co CCGG 69.970 -999.990 ... R7 1996 09 25 12 45 00 -14.2500 -170.5700 47.00 42.00 5.00 124494 SMO 1996 09 17 00 45 00 1816-91 D co CCGG 71.020 -999.990 ... R7 1996 09 25 13 01 00 -14.2500 -170.5700 47.00 42.00 5.00 124495 SMO 1996 09 17 00 45 00 2031-91 P co CCGG 347.880 -999.990 P.C R7 1996 09 25 12 12 00 -14.2500 -170.5700 47.00 42.00 5.00 124496 SMO 1996 09 17 00 45 00 2032-91 P co CCGG 389.370 -999.990 P.C R7 1996 09 25 12 28 00 -14.2500 -170.5700 47.00 42.00 5.00 124497 SMO 1996 09 17 02 45 00 2227-66 S co CCGG 68.510 -999.990 S.. R7 1996 10 03 15 41 00 -14.2500 -170.5700 60.30 42.00 18.30 124498 SMO 1996 09 17 02 45 00 2228-66 S co CCGG 68.010 -999.990 S.. R7 1996 10 03 15 59 00 -14.2500 -170.5700 60.30 42.00 18.30 124499 SMO 1996 09 24 23 15 00 1763-91 P co CCGG 73.690 -999.990 ... R7 1996 10 03 10 21 00 -14.2500 -170.5700 47.00 42.00 5.00 124502 SMO 1996 09 24 23 15 00 1764-91 P co CCGG 74.490 -999.990 ... R7 1996 10 03 10 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124503 SMO 1996 09 24 23 15 00 67-91 D co CCGG 77.150 -999.990 ... R7 1996 10 02 12 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124500 SMO 1996 09 24 23 15 00 68-91 D co CCGG 75.930 -999.990 ... R7 1996 10 02 12 52 00 -14.2500 -170.5700 47.00 42.00 5.00 124501 SMO 1996 09 25 00 48 00 2061-66 S co CCGG 71.320 -999.990 S.. R7 1996 10 03 16 17 00 -14.2500 -170.5700 60.30 42.00 18.30 124504 SMO 1996 09 25 00 48 00 2062-66 S co CCGG 73.470 -999.990 S.. R7 1996 10 03 16 35 00 -14.2500 -170.5700 60.30 42.00 18.30 124505 SMO 1996 10 03 00 35 00 1353-91 D co CCGG 76.470 -999.990 ... R7 1996 10 17 14 56 00 -14.2500 -170.5700 47.00 42.00 5.00 124506 SMO 1996 10 03 00 35 00 1354-91 D co CCGG 75.590 -999.990 ... R7 1996 10 17 15 12 00 -14.2500 -170.5700 47.00 42.00 5.00 124507 SMO 1996 10 03 00 35 00 1471-91 P co CCGG 73.420 -999.990 ... R7 1996 10 17 14 39 00 -14.2500 -170.5700 47.00 42.00 5.00 124508 SMO 1996 10 03 02 27 00 2114-66 S co CCGG 78.370 -999.990 S.. R7 1996 11 25 16 54 00 -14.2500 -170.5700 60.30 42.00 18.30 124511 SMO 1996 10 28 22 40 00 1983-91 D co CCGG 68.350 -999.990 ... R7 1996 11 12 14 12 00 -14.2500 -170.5700 47.00 42.00 5.00 124512 SMO 1996 10 28 22 40 00 1984-91 D co CCGG 69.140 -999.990 ... R7 1996 11 12 14 29 00 -14.2500 -170.5700 47.00 42.00 5.00 124513 SMO 1996 10 29 01 03 00 2051-66 S co CCGG 67.590 -999.990 S.. R7 1996 11 25 14 46 00 -14.2500 -170.5700 60.30 42.00 18.30 124514 SMO 1996 10 29 01 03 00 2052-66 S co CCGG 67.890 -999.990 S.. R7 1996 11 25 15 04 00 -14.2500 -170.5700 60.30 42.00 18.30 124515 SMO 1996 11 05 22 50 00 1343-91 D co CCGG 67.130 -999.990 ... R7 1996 11 20 16 58 00 -14.2500 -170.5700 47.00 42.00 5.00 124516 SMO 1996 11 05 22 50 00 1344-91 D co CCGG 67.730 -999.990 ... R7 1996 11 20 17 14 00 -14.2500 -170.5700 47.00 42.00 5.00 124517 SMO 1996 11 06 00 30 00 2073-66 S co CCGG 65.090 -999.990 S.. R7 1996 11 25 13 18 00 -14.2500 -170.5700 60.30 42.00 18.30 124518 SMO 1996 11 06 00 30 00 2074-66 S co CCGG 63.550 -999.990 S.. R7 1996 11 25 13 34 00 -14.2500 -170.5700 60.30 42.00 18.30 124519 SMO 1996 11 14 22 20 00 1261-91 D co CCGG 63.460 -999.990 ... R7 1996 11 20 18 04 00 -14.2500 -170.5700 47.00 42.00 5.00 124520 SMO 1996 11 14 22 20 00 1262-91 D co CCGG 62.080 -999.990 ... R7 1996 11 20 18 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124521 SMO 1996 11 15 01 00 00 2268-66 S co CCGG 60.880 -999.990 S.. R7 1996 11 25 14 28 00 -14.2500 -170.5700 60.30 42.00 18.30 124523 SMO 1996 11 18 22 20 00 233-91 D co CCGG 70.170 -999.990 ... R7 1996 12 04 10 08 00 -14.2500 -170.5700 47.00 42.00 5.00 124524 SMO 1996 11 18 22 20 00 234-91 D co CCGG 69.470 -999.990 ... R7 1996 12 04 10 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124525 SMO 1996 11 18 23 40 00 2349-66 S co CCGG 68.180 -999.990 S.. R7 1996 12 27 08 48 00 -14.2500 -170.5700 60.30 42.00 18.30 124527 SMO 1996 11 26 22 40 00 2051-91 D co CCGG 68.140 -999.990 P.. R7 1996 12 04 10 40 00 -14.2500 -170.5700 47.00 42.00 5.00 124528 SMO 1996 11 26 22 40 00 2052-91 D co CCGG 64.310 -999.990 P.. R7 1996 12 04 10 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124529 SMO 1996 11 27 01 25 00 2151-66 S co CCGG 63.910 -999.990 S.. R7 1997 01 09 08 38 00 -14.2500 -170.5700 60.30 42.00 18.30 124530 SMO 1996 11 27 01 25 00 2152-66 S co CCGG 67.990 -999.990 S.. R7 1997 01 09 08 56 00 -14.2500 -170.5700 60.30 42.00 18.30 124531 SMO 1996 12 04 22 40 00 1569-91 D co CCGG 65.460 -999.990 P.. R7 1996 12 26 12 58 00 -14.2500 -170.5700 47.00 42.00 5.00 124532 SMO 1996 12 04 22 40 00 1570-91 D co CCGG 70.590 -999.990 P.. R7 1996 12 26 13 14 00 -14.2500 -170.5700 47.00 42.00 5.00 124533 SMO 1996 12 05 00 30 00 2312-66 S co CCGG 66.090 -999.990 S.. R7 1997 01 09 09 14 00 -14.2500 -170.5700 60.30 42.00 18.30 124534 SMO 1996 12 05 00 30 00 2318-66 S co CCGG 70.130 -999.990 S.. R7 1997 01 09 09 32 00 -14.2500 -170.5700 60.30 42.00 18.30 124535 SMO 1996 12 09 22 50 00 1149-91 D co CCGG 67.480 -999.990 ... R7 1996 12 26 12 25 00 -14.2500 -170.5700 47.00 42.00 5.00 124536 SMO 1996 12 09 22 50 00 1150-91 D co CCGG 67.570 -999.990 ... R7 1996 12 26 12 42 00 -14.2500 -170.5700 47.00 42.00 5.00 124537 SMO 1996 12 10 01 10 00 2019-66 S co CCGG 70.280 -999.990 S.. R7 1996 12 27 16 55 00 -14.2500 -170.5700 60.30 42.00 18.30 124538 SMO 1996 12 10 01 10 00 2020-66 S co CCGG 65.280 -999.990 S.. R7 1996 12 27 17 13 00 -14.2500 -170.5700 60.30 42.00 18.30 124539 SMO 1996 12 16 22 50 00 729-91 D co CCGG 69.270 -999.990 ... R7 1997 02 04 12 02 00 -14.2500 -170.5700 47.00 42.00 5.00 124540 SMO 1996 12 16 22 50 00 730-91 D co CCGG 68.050 -999.990 ... R7 1997 02 04 12 18 00 -14.2500 -170.5700 47.00 42.00 5.00 124541 SMO 1996 12 17 01 05 00 2087-66 S co CCGG 64.600 -999.990 S.. R7 1996 12 27 16 18 00 -14.2500 -170.5700 60.30 42.00 18.30 124542 SMO 1996 12 17 01 05 00 2088-66 S co CCGG 64.100 -999.990 S.. R7 1996 12 27 16 36 00 -14.2500 -170.5700 60.30 42.00 18.30 124543 SMO 1996 12 23 22 45 00 643-91 D co CCGG 55.760 -999.990 ... R7 1997 02 04 10 56 00 -14.2500 -170.5700 47.00 42.00 5.00 124544 SMO 1996 12 23 22 45 00 644-91 D co CCGG -999.990 -999.990 *.. R7 1997 02 04 11 13 00 -14.2500 -170.5700 47.00 42.00 5.00 124545 SMO 1996 12 24 01 45 00 2089-66 S co CCGG 38.700 -999.990 S.C R7 1997 02 19 08 34 00 -14.2500 -170.5700 60.30 42.00 18.30 124546 SMO 1996 12 30 22 45 00 2027-91 D co CCGG 65.030 -999.990 ... R7 1997 01 16 12 38 00 -14.2500 -170.5700 47.00 42.00 5.00 124547 SMO 1996 12 31 01 27 00 2141-66 S co CCGG 42.450 -999.990 S.. R7 1997 02 19 07 58 00 -14.2500 -170.5700 60.30 42.00 18.30 124548 SMO 1996 12 31 01 27 00 2142-66 S co CCGG 42.800 -999.990 S.. R7 1997 02 19 08 16 00 -14.2500 -170.5700 60.30 42.00 18.30 124549 SMO 1997 01 09 22 45 00 295-91 D co CCGG 73.090 -999.990 ... R7 1997 01 16 09 10 00 -14.2500 -170.5700 47.00 42.00 5.00 124550 SMO 1997 01 09 22 45 00 296-91 D co CCGG 72.750 -999.990 ... R7 1997 01 16 09 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124551 SMO 1997 01 15 22 50 00 185-91 D co CCGG 61.630 -999.990 ... R7 1997 02 27 09 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124554 SMO 1997 01 15 22 50 00 186-91 D co CCGG 60.060 -999.990 ... R7 1997 02 27 09 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124555 SMO 1997 01 21 22 50 00 1069-91 D co CCGG 64.380 -999.990 ... R7 1997 02 27 09 52 00 -14.2500 -170.5700 47.00 42.00 5.00 124558 SMO 1997 01 21 22 50 00 1070-91 D co CCGG 64.670 -999.990 ... R7 1997 02 27 10 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124559 SMO 1997 01 22 01 07 00 2297-66 S co CCGG 62.320 -999.990 S.. R7 1997 02 13 09 19 00 -14.2500 -170.5700 60.30 42.00 18.30 124560 SMO 1997 01 22 01 07 00 2298-66 S co CCGG 61.900 -999.990 S.. R7 1997 02 13 09 37 00 -14.2500 -170.5700 60.30 42.00 18.30 124561 SMO 1997 01 27 22 45 00 1739-91 D co CCGG 60.410 -999.990 ... R7 1997 02 26 13 02 00 -14.2500 -170.5700 47.00 42.00 5.00 124562 SMO 1997 01 27 22 45 00 1740-91 D co CCGG 59.690 -999.990 ... R7 1997 02 26 13 19 00 -14.2500 -170.5700 47.00 42.00 5.00 124563 SMO 1997 01 27 23 55 00 2003-66 S co CCGG 57.570 -999.990 S.. R7 1997 02 13 08 42 00 -14.2500 -170.5700 60.30 42.00 18.30 124564 SMO 1997 01 27 23 55 00 2004-66 S co CCGG 57.380 -999.990 S.. R7 1997 02 13 09 00 00 -14.2500 -170.5700 60.30 42.00 18.30 124565 SMO 1997 02 04 22 30 00 1859-91 D co CCGG 56.800 -999.990 ... R7 1997 02 26 13 35 00 -14.2500 -170.5700 47.00 42.00 5.00 124566 SMO 1997 02 04 22 30 00 1860-91 D co CCGG 56.530 -999.990 ... R7 1997 02 26 13 51 00 -14.2500 -170.5700 47.00 42.00 5.00 124567 SMO 1997 02 05 01 30 00 2241-66 S co CCGG 52.940 -999.990 S.. R7 1997 02 27 11 02 00 -14.2500 -170.5700 60.30 42.00 18.30 124568 SMO 1997 02 05 01 30 00 2242-66 S co CCGG 53.310 -999.990 S.. R7 1997 02 27 11 18 00 -14.2500 -170.5700 60.30 42.00 18.30 124569 SMO 1997 02 12 01 10 00 1275-91 D co CCGG 56.310 -999.990 ... R7 1997 03 26 15 22 00 -14.2500 -170.5700 47.00 42.00 5.00 124570 SMO 1997 02 12 01 10 00 1276-91 D co CCGG 55.770 -999.990 ... R7 1997 03 26 15 38 00 -14.2500 -170.5700 47.00 42.00 5.00 124571 SMO 1997 02 12 03 00 00 2309-66 S co CCGG 53.740 -999.990 S.. R7 1997 02 27 11 36 00 -14.2500 -170.5700 60.30 42.00 18.30 124572 SMO 1997 02 12 03 00 00 2310-66 S co CCGG 55.170 -999.990 S.. R7 1997 02 27 11 54 00 -14.2500 -170.5700 60.30 42.00 18.30 124573 SMO 1997 02 18 22 40 00 4037-91 D co CCGG 59.340 -999.990 ... R7 1997 03 26 14 49 00 -14.2500 -170.5700 47.00 42.00 5.00 124574 SMO 1997 02 18 22 40 00 4038-91 D co CCGG 58.900 -999.990 ... R7 1997 03 26 15 06 00 -14.2500 -170.5700 47.00 42.00 5.00 124575 SMO 1997 02 19 01 22 00 2011-66 S co CCGG 61.070 -999.990 S.. R7 1997 03 20 14 35 00 -14.2500 -170.5700 60.30 42.00 18.30 124576 SMO 1997 02 19 01 22 00 2012-66 S co CCGG 64.000 -999.990 S.. R7 1997 03 20 14 52 00 -14.2500 -170.5700 60.30 42.00 18.30 124577 SMO 1997 02 25 22 00 00 123-91 D co CCGG 53.070 -999.990 ... R7 1997 04 01 14 52 00 -14.2500 -170.5700 47.00 42.00 5.00 124578 SMO 1997 02 25 22 00 00 124-91 D co CCGG 51.940 -999.990 ... R7 1997 04 01 15 08 00 -14.2500 -170.5700 47.00 42.00 5.00 124579 SMO 1997 02 25 23 12 00 2001-66 S co CCGG 55.100 -999.990 S.. R7 1997 03 20 13 59 00 -14.2500 -170.5700 60.30 42.00 18.30 124580 SMO 1997 02 25 23 12 00 2002-66 S co CCGG 54.520 -999.990 S.. R7 1997 03 20 14 17 00 -14.2500 -170.5700 60.30 42.00 18.30 124581 SMO 1997 03 03 22 40 00 4029-91 D co CCGG 65.550 -999.990 ... R7 1997 04 01 14 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124582 SMO 1997 03 03 22 40 00 4030-91 D co CCGG 65.560 -999.990 ... R7 1997 04 01 14 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124583 SMO 1997 03 04 02 24 00 2177-66 S co CCGG 65.290 -999.990 S.. R7 1997 03 24 10 21 00 -14.2500 -170.5700 60.30 42.00 18.30 124584 SMO 1997 03 04 02 24 00 2178-66 S co CCGG 64.970 -999.990 S.. R7 1997 03 24 10 39 00 -14.2500 -170.5700 60.30 42.00 18.30 124585 SMO 1997 03 12 00 35 00 843-91 D co CCGG 78.660 -999.990 .X. R7 1997 04 09 13 27 00 -14.2500 -170.5700 47.00 42.00 5.00 124586 SMO 1997 03 12 00 35 00 844-91 D co CCGG 78.070 -999.990 .X. R7 1997 04 09 13 43 00 -14.2500 -170.5700 47.00 42.00 5.00 124587 SMO 1997 03 12 01 50 00 2129-66 S co CCGG 76.490 -999.990 S.. R7 1997 03 24 09 45 00 -14.2500 -170.5700 60.30 42.00 18.30 124588 SMO 1997 03 12 01 50 00 2130-66 S co CCGG 76.640 -999.990 S.. R7 1997 03 24 10 03 00 -14.2500 -170.5700 60.30 42.00 18.30 124589 SMO 1997 03 18 22 10 00 4001-91 D co CCGG 81.220 -999.990 .X. R7 1997 04 09 12 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124590 SMO 1997 03 18 22 10 00 4002-91 D co CCGG 79.480 -999.990 .X. R7 1997 04 09 13 10 00 -14.2500 -170.5700 47.00 42.00 5.00 124591 SMO 1997 03 19 01 02 00 2346-66 S co CCGG 83.200 -999.990 S.. R7 1997 04 07 11 25 00 -14.2500 -170.5700 60.30 42.00 18.30 124593 SMO 1997 03 26 00 25 00 669-91 D co CCGG 59.580 -999.990 ... R7 1997 05 08 17 12 00 -14.2500 -170.5700 47.00 42.00 5.00 124594 SMO 1997 03 26 00 25 00 670-91 D co CCGG 58.030 -999.990 ... R7 1997 05 08 17 28 00 -14.2500 -170.5700 47.00 42.00 5.00 124595 SMO 1997 03 26 01 50 00 2155-66 S co CCGG 54.960 -999.990 S.. R7 1997 04 07 10 48 00 -14.2500 -170.5700 60.30 42.00 18.30 124596 SMO 1997 03 26 01 50 00 2156-66 S co CCGG 54.020 -999.990 S.. R7 1997 04 07 11 06 00 -14.2500 -170.5700 60.30 42.00 18.30 124597 SMO 1997 03 31 22 40 00 1651-91 D co CCGG 56.100 -999.990 ... R7 1997 05 08 16 39 00 -14.2500 -170.5700 47.00 42.00 5.00 124598 SMO 1997 03 31 22 40 00 1652-91 D co CCGG 55.860 -999.990 ... R7 1997 05 08 16 55 00 -14.2500 -170.5700 47.00 42.00 5.00 124599 SMO 1997 04 01 01 36 00 2053-66 S co CCGG 55.070 -999.990 S.. R7 1997 05 12 09 43 00 -14.2500 -170.5700 60.30 42.00 18.30 124600 SMO 1997 04 01 01 36 00 2054-66 S co CCGG 54.170 -999.990 S.. R7 1997 05 12 10 01 00 -14.2500 -170.5700 60.30 42.00 18.30 124601 SMO 1997 04 07 22 30 00 763-91 D co CCGG 53.590 -999.990 ... R7 1997 04 28 09 12 00 -14.2500 -170.5700 47.00 42.00 5.00 124602 SMO 1997 04 07 22 30 00 764-91 D co CCGG 52.890 -999.990 ... R7 1997 04 28 09 29 00 -14.2500 -170.5700 47.00 42.00 5.00 124603 SMO 1997 04 08 00 05 00 2313-66 S co CCGG 55.230 -999.990 S.. R7 1997 05 12 10 59 00 -14.2500 -170.5700 60.30 42.00 18.30 124604 SMO 1997 04 08 00 05 00 2314-66 S co CCGG 55.930 -999.990 S.. R7 1997 05 12 11 18 00 -14.2500 -170.5700 60.30 42.00 18.30 124605 SMO 1997 04 14 22 35 00 457-91 D co CCGG 61.110 -999.990 ... R7 1997 04 28 09 46 00 -14.2500 -170.5700 47.00 42.00 5.00 124606 SMO 1997 04 14 22 35 00 458-91 D co CCGG 61.330 -999.990 ... R7 1997 04 28 10 02 00 -14.2500 -170.5700 47.00 42.00 5.00 124607 SMO 1997 04 15 01 34 00 2167-66 S co CCGG 59.860 -999.990 S.. R7 1997 05 12 10 19 00 -14.2500 -170.5700 60.30 42.00 18.30 124608 SMO 1997 04 15 01 34 00 2168-66 S co CCGG 61.860 -999.990 S.. R7 1997 05 12 10 37 00 -14.2500 -170.5700 60.30 42.00 18.30 124609 SMO 1997 04 26 00 00 00 2067-66 S co CCGG 60.850 -999.990 S.. R7 1997 05 12 09 07 00 -14.2500 -170.5700 60.30 42.00 18.30 124610 SMO 1997 04 26 00 00 00 2068-66 S co CCGG 60.790 -999.990 S.. R7 1997 05 12 09 25 00 -14.2500 -170.5700 60.30 42.00 18.30 124611 SMO 1997 04 29 23 00 00 1465-91 D co CCGG 57.340 -999.990 ... R7 1997 05 30 13 06 00 -14.2500 -170.5700 47.00 42.00 5.00 124612 SMO 1997 04 29 23 00 00 1466-91 D co CCGG 56.200 -999.990 ... R7 1997 05 30 13 22 00 -14.2500 -170.5700 47.00 42.00 5.00 124613 SMO 1997 04 30 01 23 00 2143-66 S co CCGG 56.770 -999.990 S.. R7 1997 05 21 14 58 00 -14.2500 -170.5700 60.30 42.00 18.30 124614 SMO 1997 04 30 01 23 00 2144-66 S co CCGG 57.510 -999.990 S.. R7 1997 05 21 15 16 00 -14.2500 -170.5700 60.30 42.00 18.30 124615 SMO 1997 05 07 22 15 00 235-91 D co CCGG 63.750 -999.990 ... R7 1997 05 30 13 38 00 -14.2500 -170.5700 47.00 42.00 5.00 124616 SMO 1997 05 07 22 15 00 236-91 D co CCGG 61.950 -999.990 ... R7 1997 05 30 13 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124617 SMO 1997 05 07 23 30 00 1241-91 D co CCGG 55.760 -999.990 ... R7 1997 06 18 15 18 00 -14.2500 -170.5700 47.00 42.00 5.00 124618 SMO 1997 05 07 23 30 00 1242-91 D co CCGG 57.020 -999.990 ... R5 1997 06 23 11 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124619 SMO 1997 05 07 23 30 00 1242-91 D co CCGG 55.080 -999.990 ... R7 1997 06 18 15 34 00 -14.2500 -170.5700 47.00 42.00 5.00 124619 SMO 1997 05 08 02 15 00 2093-66 S co CCGG 54.660 -999.990 S.. R7 1997 05 21 15 34 00 -14.2500 -170.5700 60.30 42.00 18.30 124620 SMO 1997 05 08 02 15 00 2094-66 S co CCGG 55.410 -999.990 S.. R7 1997 05 21 15 52 00 -14.2500 -170.5700 60.30 42.00 18.30 124621 SMO 1997 05 12 22 30 00 4201-91 D co CCGG 56.210 -999.990 P.. R7 1997 06 18 10 46 00 -14.2500 -170.5700 47.00 42.00 5.00 124622 SMO 1997 05 12 22 30 00 4202-91 D co CCGG 54.930 -999.990 P.. R5 1997 06 18 14 38 00 -14.2500 -170.5700 47.00 42.00 5.00 124623 SMO 1997 05 12 22 30 00 4202-91 D co CCGG 53.740 -999.990 P.. R7 1997 06 18 11 03 00 -14.2500 -170.5700 47.00 42.00 5.00 124623 SMO 1997 05 13 01 40 00 2261-66 S co CCGG 54.160 -999.990 S.. R5 1997 06 23 11 39 00 -14.2500 -170.5700 60.30 42.00 18.30 124624 SMO 1997 05 13 01 40 00 2261-66 S co CCGG 53.990 -999.990 S.. R7 1997 06 19 13 34 00 -14.2500 -170.5700 60.30 42.00 18.30 124624 SMO 1997 05 13 01 40 00 2262-66 S co CCGG 53.660 -999.990 S.. R5 1997 06 23 11 53 00 -14.2500 -170.5700 60.30 42.00 18.30 124625 SMO 1997 05 13 01 40 00 2262-66 S co CCGG 52.890 -999.990 S.. R7 1997 06 19 13 50 00 -14.2500 -170.5700 60.30 42.00 18.30 124625 SMO 1997 05 22 23 10 00 113-91 D co CCGG 54.550 -999.990 ... R7 1997 06 13 08 30 00 -14.2500 -170.5700 47.00 42.00 5.00 124626 SMO 1997 05 22 23 10 00 114-91 D co CCGG 55.800 -999.990 ... R5 1997 06 18 09 48 00 -14.2500 -170.5700 47.00 42.00 5.00 124627 SMO 1997 05 22 23 10 00 114-91 D co CCGG 54.840 -999.990 ... R7 1997 06 13 08 46 00 -14.2500 -170.5700 47.00 42.00 5.00 124627 SMO 1997 05 23 00 27 00 2225-66 S co CCGG 61.160 -999.990 S.. R5 1997 06 23 12 06 00 -14.2500 -170.5700 60.30 42.00 18.30 124628 SMO 1997 05 23 00 27 00 2225-66 S co CCGG 57.960 -999.990 S.. R7 1997 06 19 13 00 00 -14.2500 -170.5700 60.30 42.00 18.30 124628 SMO 1997 05 23 00 27 00 2226-66 S co CCGG 67.270 -999.990 S.. R5 1997 06 23 12 20 00 -14.2500 -170.5700 60.30 42.00 18.30 124629 SMO 1997 05 23 00 27 00 2226-66 S co CCGG 63.680 -999.990 S.. R7 1997 06 19 13 17 00 -14.2500 -170.5700 60.30 42.00 18.30 124629 SMO 1997 05 27 23 10 00 765-91 D co CCGG 52.770 -999.990 ... R7 1997 06 13 10 06 00 -14.2500 -170.5700 47.00 42.00 5.00 124630 SMO 1997 05 27 23 10 00 766-91 D co CCGG 53.980 -999.990 ... R5 1997 06 18 10 29 00 -14.2500 -170.5700 47.00 42.00 5.00 124631 SMO 1997 05 27 23 10 00 766-91 D co CCGG 53.660 -999.990 ... R7 1997 06 13 10 22 00 -14.2500 -170.5700 47.00 42.00 5.00 124631 SMO 1997 05 28 01 07 00 2055-66 S co CCGG 55.340 -999.990 S.. R5 1997 07 14 14 17 00 -14.2500 -170.5700 60.30 42.00 18.30 124632 SMO 1997 05 28 01 07 00 2055-66 S co CCGG 57.110 -999.990 S.. R7 1997 07 14 08 27 00 -14.2500 -170.5700 60.30 42.00 18.30 124632 SMO 1997 05 28 01 07 00 2056-66 S co CCGG 59.600 -999.990 S.. R5 1997 07 14 14 31 00 -14.2500 -170.5700 60.30 42.00 18.30 124633 SMO 1997 05 28 01 07 00 2056-66 S co CCGG 57.190 -999.990 S.. R7 1997 07 14 08 45 00 -14.2500 -170.5700 60.30 42.00 18.30 124633 SMO 1997 06 02 23 00 00 471-91 D co CCGG 61.800 -999.990 ... R7 1997 07 17 12 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124634 SMO 1997 06 02 23 00 00 472-91 D co CCGG 60.870 -999.990 ... R5 1997 07 18 14 01 00 -14.2500 -170.5700 47.00 42.00 5.00 124635 SMO 1997 06 02 23 00 00 472-91 D co CCGG 59.810 -999.990 ... R7 1997 07 17 12 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124635 SMO 1997 06 03 00 48 00 2079-66 S co CCGG 63.050 -999.990 S.. R5 1997 07 14 13 50 00 -14.2500 -170.5700 60.30 42.00 18.30 124636 SMO 1997 06 03 00 48 00 2079-66 S co CCGG 61.980 -999.990 S.. R7 1997 07 14 09 03 00 -14.2500 -170.5700 60.30 42.00 18.30 124636 SMO 1997 06 03 00 48 00 2080-66 S co CCGG 61.040 -999.990 S.. R5 1997 07 14 14 03 00 -14.2500 -170.5700 60.30 42.00 18.30 124637 SMO 1997 06 03 00 48 00 2080-66 S co CCGG 61.040 -999.990 S.. R7 1997 07 14 09 21 00 -14.2500 -170.5700 60.30 42.00 18.30 124637 SMO 1997 06 09 23 15 00 1819-91 D co CCGG 57.470 -999.990 ... R7 1997 07 17 13 13 00 -14.2500 -170.5700 47.00 42.00 5.00 124638 SMO 1997 06 09 23 15 00 1820-91 D co CCGG 56.450 -999.990 ... R5 1997 07 18 14 14 00 -14.2500 -170.5700 47.00 42.00 5.00 124639 SMO 1997 06 09 23 15 00 1820-91 D co CCGG 55.300 -999.990 ... R7 1997 07 17 13 29 00 -14.2500 -170.5700 47.00 42.00 5.00 124639 SMO 1997 06 10 01 01 00 2019-66 S co CCGG 59.000 -999.990 S.. R5 1997 07 03 15 09 00 -14.2500 -170.5700 60.30 42.00 18.30 124640 SMO 1997 06 10 01 01 00 2019-66 S co CCGG 56.140 -999.990 S.. R7 1997 07 01 11 19 00 -14.2500 -170.5700 60.30 42.00 18.30 124640 SMO 1997 06 10 01 01 00 2020-66 S co CCGG 57.830 -999.990 S.. R5 1997 07 03 15 22 00 -14.2500 -170.5700 60.30 42.00 18.30 124641 SMO 1997 06 10 01 01 00 2020-66 S co CCGG 54.940 -999.990 S.. R7 1997 07 01 11 37 00 -14.2500 -170.5700 60.30 42.00 18.30 124641 SMO 1997 06 17 22 15 00 123-91 D co CCGG 57.960 -999.990 ... R7 1997 07 08 13 23 00 -14.2500 -170.5700 47.00 42.00 5.00 124642 SMO 1997 06 17 22 15 00 124-91 D co CCGG 59.080 -999.990 ... R5 1997 07 09 14 23 00 -14.2500 -170.5700 47.00 42.00 5.00 124643 SMO 1997 06 17 22 15 00 124-91 D co CCGG 58.460 -999.990 ... R7 1997 07 08 13 39 00 -14.2500 -170.5700 47.00 42.00 5.00 124643 SMO 1997 06 18 01 10 00 2031-66 S co CCGG 59.410 -999.990 S.. R5 1997 07 03 12 39 00 -14.2500 -170.5700 60.30 42.00 18.30 124644 SMO 1997 06 18 01 10 00 2031-66 S co CCGG 57.560 -999.990 S.. R7 1997 07 01 13 33 00 -14.2500 -170.5700 60.30 42.00 18.30 124644 SMO 1997 06 18 01 10 00 2032-66 S co CCGG 59.670 -999.990 S.. R5 1997 07 03 12 53 00 -14.2500 -170.5700 60.30 42.00 18.30 124645 SMO 1997 06 18 01 10 00 2032-66 S co CCGG 58.000 -999.990 S.. R7 1997 07 01 13 51 00 -14.2500 -170.5700 60.30 42.00 18.30 124645 SMO 1997 06 24 22 45 00 4029-91 D co CCGG 58.190 -999.990 ... R7 1997 07 08 14 33 00 -14.2500 -170.5700 47.00 42.00 5.00 124646 SMO 1997 06 24 22 45 00 4030-91 D co CCGG 61.280 -999.990 ... R5 1997 07 09 14 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124647 SMO 1997 06 24 22 45 00 4030-91 D co CCGG 60.180 -999.990 ... R7 1997 07 08 14 49 00 -14.2500 -170.5700 47.00 42.00 5.00 124647 SMO 1997 06 25 00 00 00 2051-66 S co CCGG 60.140 -999.990 S.. R5 1997 07 14 15 12 00 -14.2500 -170.5700 60.30 42.00 18.30 124648 SMO 1997 06 25 00 00 00 2051-66 S co CCGG 56.800 -999.990 S.. R7 1997 07 14 10 14 00 -14.2500 -170.5700 60.30 42.00 18.30 124648 SMO 1997 06 25 00 00 00 2052-66 S co CCGG 59.160 -999.990 S.. R5 1997 07 14 15 25 00 -14.2500 -170.5700 60.30 42.00 18.30 124649 SMO 1997 06 25 00 00 00 2052-66 S co CCGG 58.790 -999.990 S.. R7 1997 07 14 10 32 00 -14.2500 -170.5700 60.30 42.00 18.30 124649 SMO 1997 06 30 23 12 00 4161-91 D co CCGG 60.120 -999.990 *.. R7 1997 08 01 11 39 00 -14.2500 -170.5700 47.00 42.00 5.00 124650 SMO 1997 06 30 23 12 00 4162-91 D co CCGG 58.740 -999.990 *.. R7 1997 08 01 11 56 00 -14.2500 -170.5700 47.00 42.00 5.00 124651 SMO 1997 07 01 02 05 00 2107-66 S co CCGG 59.320 -999.990 S.. R5 1997 07 14 14 44 00 -14.2500 -170.5700 60.30 42.00 18.30 124652 SMO 1997 07 01 02 05 00 2107-66 S co CCGG 57.410 -999.990 S.. R7 1997 07 14 09 38 00 -14.2500 -170.5700 60.30 42.00 18.30 124652 SMO 1997 07 01 02 05 00 2108-66 S co CCGG 58.720 -999.990 S.. R5 1997 07 14 14 58 00 -14.2500 -170.5700 60.30 42.00 18.30 124653 SMO 1997 07 01 02 05 00 2108-66 S co CCGG 57.600 -999.990 S.. R7 1997 07 14 09 56 00 -14.2500 -170.5700 60.30 42.00 18.30 124653 SMO 1997 07 08 22 50 00 4163-91 D co CCGG 61.940 -999.990 *.. R7 1997 08 01 13 17 00 -14.2500 -170.5700 47.00 42.00 5.00 124654 SMO 1997 07 08 22 50 00 4164-91 D co CCGG 62.310 -999.990 *.. R7 1997 08 01 13 34 00 -14.2500 -170.5700 47.00 42.00 5.00 124655 SMO 1997 07 08 23 54 00 2015-66 S co CCGG 60.020 -999.990 S.. R5 1997 07 29 12 51 00 -14.2500 -170.5700 60.30 42.00 18.30 124656 SMO 1997 07 08 23 54 00 2015-66 S co CCGG 57.640 -999.990 *.. R7 1997 07 24 12 29 00 -14.2500 -170.5700 60.30 42.00 18.30 124656 SMO 1997 07 08 23 54 00 2016-66 S co CCGG 59.560 -999.990 S.. R5 1997 07 29 13 05 00 -14.2500 -170.5700 60.30 42.00 18.30 124657 SMO 1997 07 08 23 54 00 2016-66 S co CCGG 58.790 -999.990 *.. R7 1997 07 24 12 47 00 -14.2500 -170.5700 60.30 42.00 18.30 124657 SMO 1997 07 14 22 30 00 4395-91 D co CCGG 59.120 -999.990 *.. R7 1997 08 01 12 12 00 -14.2500 -170.5700 47.00 42.00 5.00 124658 SMO 1997 07 14 22 30 00 4396-91 D co CCGG 59.010 -999.990 *.. R7 1997 08 01 12 28 00 -14.2500 -170.5700 47.00 42.00 5.00 124659 SMO 1997 07 15 00 38 00 2153-66 S co CCGG 59.080 -999.990 S.. R5 1997 07 29 13 18 00 -14.2500 -170.5700 60.30 42.00 18.30 124660 SMO 1997 07 15 00 38 00 2153-66 S co CCGG 57.080 -999.990 *.. R7 1997 07 24 11 53 00 -14.2500 -170.5700 60.30 42.00 18.30 124660 SMO 1997 07 15 00 38 00 2154-66 S co CCGG 59.950 -999.990 S.. R5 1997 07 29 13 32 00 -14.2500 -170.5700 60.30 42.00 18.30 124661 SMO 1997 07 15 00 38 00 2154-66 S co CCGG 57.370 -999.990 *.. R7 1997 07 24 12 11 00 -14.2500 -170.5700 60.30 42.00 18.30 124661 SMO 1997 07 22 01 15 00 4397-91 D co CCGG 56.120 -999.990 *.. R7 1997 08 01 12 44 00 -14.2500 -170.5700 47.00 42.00 5.00 124662 SMO 1997 07 22 01 15 00 4398-91 D co CCGG 55.460 -999.990 *.. R7 1997 08 01 13 01 00 -14.2500 -170.5700 47.00 42.00 5.00 124663 SMO 1997 07 22 03 19 00 2141-66 S co CCGG 58.870 -999.990 S.. R5 1997 08 06 13 50 00 -14.2500 -170.5700 60.30 42.00 18.30 124664 SMO 1997 07 22 03 19 00 2142-66 S co CCGG 61.580 -999.990 S.. R5 1997 08 06 14 00 00 -14.2500 -170.5700 60.30 42.00 18.30 124665 SMO 1997 07 28 22 37 00 4641-91 D co CCGG 73.240 -999.990 ... R5 1997 08 13 09 56 00 -14.2500 -170.5700 47.00 42.00 5.00 124666 SMO 1997 07 28 22 37 00 4642-91 D co CCGG 71.090 -999.990 ... R5 1997 08 13 10 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124667 SMO 1997 07 28 23 55 00 2213-66 S co CCGG 53.950 -999.990 S.. R5 1997 08 06 13 30 00 -14.2500 -170.5700 60.30 42.00 18.30 124668 SMO 1997 07 28 23 55 00 2214-66 S co CCGG 58.490 -999.990 S.. R5 1997 08 06 13 40 00 -14.2500 -170.5700 60.30 42.00 18.30 124669 SMO 1997 08 05 22 40 00 4645-91 D co CCGG 68.050 -999.990 ... R5 1997 08 13 09 28 00 -14.2500 -170.5700 47.00 42.00 5.00 124670 SMO 1997 08 05 22 40 00 4646-91 D co CCGG 67.140 -999.990 ... R5 1997 08 13 09 42 00 -14.2500 -170.5700 47.00 42.00 5.00 124671 SMO 1997 08 05 23 51 00 2107-91 S co CCGG 62.700 -999.990 S.. R5 1997 08 21 14 36 00 -14.2500 -170.5700 60.30 42.00 18.30 124672 SMO 1997 08 05 23 51 00 2108-91 S co CCGG 59.890 -999.990 S.. R5 1997 08 21 14 50 00 -14.2500 -170.5700 60.30 42.00 18.30 124673 SMO 1997 08 08 22 35 00 4157-91 D co CCGG 63.250 -999.990 ... R5 1997 08 29 09 22 00 -14.2500 -170.5700 47.00 42.00 5.00 124674 SMO 1997 08 08 22 35 00 4158-91 D co CCGG 61.550 -999.990 ... R5 1997 08 29 09 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124675 SMO 1997 08 09 01 38 00 2101-91 S co CCGG 59.500 -999.990 S.. R5 1997 08 21 14 09 00 -14.2500 -170.5700 60.30 42.00 18.30 124676 SMO 1997 08 09 01 38 00 2102-91 S co CCGG 59.610 -999.990 S.. R5 1997 08 21 14 22 00 -14.2500 -170.5700 60.30 42.00 18.30 124677 SMO 1997 08 20 01 44 00 1861-91 D co CCGG 69.060 -999.990 ... R5 1997 08 28 14 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124678 SMO 1997 08 20 01 44 00 1862-91 D co CCGG 68.470 -999.990 ... R5 1997 08 28 14 50 00 -14.2500 -170.5700 47.00 42.00 5.00 124679 SMO 1997 08 20 03 10 00 2261-66 S co CCGG 66.240 -999.990 S.. R5 1997 09 11 10 38 00 -14.2500 -170.5700 60.30 42.00 18.30 124680 SMO 1997 08 20 03 10 00 2262-66 S co CCGG 501.540 -999.990 S.C R5 1997 09 11 10 51 00 -14.2500 -170.5700 60.30 42.00 18.30 124681 SMO 1997 08 26 20 35 00 1463-91 D co CCGG 64.390 -999.990 ... R5 1997 09 15 12 47 00 -14.2500 -170.5700 47.00 42.00 5.00 124682 SMO 1997 08 26 20 35 00 1464-91 D co CCGG 63.170 -999.990 ... R5 1997 09 15 13 01 00 -14.2500 -170.5700 47.00 42.00 5.00 124683 SMO 1997 08 26 22 32 00 2225-66 S co CCGG 63.020 -999.990 S.. R5 1997 09 11 12 56 00 -14.2500 -170.5700 60.30 42.00 18.30 124684 SMO 1997 08 26 22 32 00 2226-66 S co CCGG 68.280 -999.990 S.. R5 1997 09 11 13 10 00 -14.2500 -170.5700 60.30 42.00 18.30 124685 SMO 1997 09 04 21 18 00 1481-91 D co CCGG 72.550 -999.990 ... R5 1997 09 15 10 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124686 SMO 1997 09 04 21 18 00 1482-91 D co CCGG 73.000 -999.990 ... R5 1997 09 15 11 08 00 -14.2500 -170.5700 47.00 42.00 5.00 124687 SMO 1997 09 04 21 44 00 2105-66 S co CCGG 73.160 -999.990 S.. R5 1997 09 25 09 55 00 -14.2500 -170.5700 60.30 42.00 18.30 124688 SMO 1997 09 04 21 44 00 2106-66 S co CCGG 73.260 -999.990 S.. R5 1997 09 25 10 09 00 -14.2500 -170.5700 60.30 42.00 18.30 124689 SMO 1997 09 08 23 20 00 259-91 D co CCGG 74.150 -999.990 ... R5 1997 09 25 13 53 00 -14.2500 -170.5700 47.00 42.00 5.00 124690 SMO 1997 09 08 23 20 00 260-91 D co CCGG 75.250 -999.990 ... R5 1997 09 25 14 07 00 -14.2500 -170.5700 47.00 42.00 5.00 124691 SMO 1997 09 09 00 40 00 2141-66 S co CCGG 70.640 -999.990 S.. R5 1997 09 25 09 29 00 -14.2500 -170.5700 60.30 42.00 18.30 124692 SMO 1997 09 09 00 40 00 2142-66 S co CCGG 73.670 -999.990 S.. R5 1997 09 25 09 42 00 -14.2500 -170.5700 60.30 42.00 18.30 124693 SMO 1997 09 15 22 45 00 1667-91 D co CCGG 74.330 -999.990 ... R5 1997 09 25 14 47 00 -14.2500 -170.5700 47.00 42.00 5.00 124694 SMO 1997 09 15 22 45 00 1668-91 D co CCGG 72.150 -999.990 ... R5 1997 09 25 15 00 00 -14.2500 -170.5700 47.00 42.00 5.00 124695 SMO 1997 09 16 00 10 00 2031-66 S co CCGG 77.630 -999.990 S.. R5 1997 12 16 16 13 00 -14.2500 -170.5700 60.30 42.00 18.30 124696 SMO 1997 09 16 00 10 00 2032-66 S co CCGG 78.940 -999.990 S.. R5 1997 12 16 16 26 00 -14.2500 -170.5700 60.30 42.00 18.30 124697 SMO 1997 09 29 22 30 00 1651-91 D co CCGG 91.140 -999.990 ... R5 1997 11 04 16 16 00 -14.2500 -170.5700 47.00 42.00 5.00 124698 SMO 1997 09 29 22 30 00 1652-91 D co CCGG 89.080 -999.990 ... R5 1997 11 04 16 30 00 -14.2500 -170.5700 47.00 42.00 5.00 124699 SMO 1997 10 08 22 00 00 1479-91 D co CCGG 84.810 -999.990 ... R5 1997 11 04 16 43 00 -14.2500 -170.5700 47.00 42.00 5.00 124700 SMO 1997 10 08 22 00 00 1480-91 D co CCGG 86.430 -999.990 ... R5 1997 11 04 16 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124701 SMO 1997 10 14 22 40 00 4347-91 D co CCGG 79.000 -999.990 ... R5 1997 11 06 16 16 00 -14.2500 -170.5700 47.00 42.00 5.00 124702 SMO 1997 10 14 22 40 00 4348-91 D co CCGG 76.440 -999.990 ... R5 1997 11 06 16 29 00 -14.2500 -170.5700 47.00 42.00 5.00 124703 SMO 1997 10 20 22 40 00 7-91 D co CCGG 86.400 -999.990 ... R5 1997 11 10 11 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124704 SMO 1997 10 20 22 40 00 8-91 D co CCGG 85.200 -999.990 ... R5 1997 11 10 11 23 00 -14.2500 -170.5700 47.00 42.00 5.00 124705 SMO 1997 10 27 23 30 00 4729-91 D co CCGG 94.120 -999.990 ... R5 1997 11 17 10 23 00 -14.2500 -170.5700 47.00 42.00 5.00 124706 SMO 1997 10 27 23 30 00 4730-91 D co CCGG 94.960 -999.990 ... R5 1997 11 17 10 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124707 SMO 1997 11 03 22 30 00 4731-91 D co CCGG 97.830 -999.990 ... R5 1997 11 17 09 56 00 -14.2500 -170.5700 47.00 42.00 5.00 124708 SMO 1997 11 03 22 30 00 4732-91 D co CCGG 95.750 -999.990 ... R5 1997 11 17 10 10 00 -14.2500 -170.5700 47.00 42.00 5.00 124709 SMO 1997 11 11 00 30 00 131-91 D co CCGG 87.780 -999.990 P.. R5 1998 01 09 14 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124710 SMO 1997 11 11 00 30 00 132-91 D co CCGG 91.130 -999.990 P.. R5 1998 01 09 14 55 00 -14.2500 -170.5700 47.00 42.00 5.00 124711 SMO 1997 11 19 01 30 00 153-91 D co CCGG 103.880 -999.990 .X. R5 1998 01 09 15 08 00 -14.2500 -170.5700 47.00 42.00 5.00 124712 SMO 1997 11 19 01 30 00 154-91 D co CCGG 101.740 -999.990 .X. R5 1998 01 09 15 22 00 -14.2500 -170.5700 47.00 42.00 5.00 124713 SMO 1997 11 26 00 43 00 2207-66 S co CCGG 91.800 -999.990 S.. R5 1997 12 16 16 39 00 -14.2500 -170.5700 60.30 42.00 18.30 124714 SMO 1997 11 26 00 43 00 2208-66 S co CCGG 90.460 -999.990 S.. R5 1997 12 16 16 53 00 -14.2500 -170.5700 60.30 42.00 18.30 124715 SMO 1997 11 26 02 00 00 1087-91 D co CCGG 96.340 -999.990 ... R5 1997 12 19 10 45 00 -14.2500 -170.5700 47.00 42.00 5.00 124716 SMO 1997 11 26 02 00 00 1088-91 D co CCGG 94.150 -999.990 ... R5 1997 12 19 10 58 00 -14.2500 -170.5700 47.00 42.00 5.00 124717 SMO 1997 11 30 22 40 00 2035-91 D co CCGG 87.840 -999.990 ... R5 1997 12 19 09 21 00 -14.2500 -170.5700 47.00 42.00 5.00 124718 SMO 1997 11 30 22 40 00 2036-91 D co CCGG 88.450 -999.990 ... R5 1997 12 19 09 34 00 -14.2500 -170.5700 47.00 42.00 5.00 124719 SMO 1997 12 01 00 55 00 2133-66 S co CCGG 82.510 -999.990 S.. R5 1998 01 15 11 17 00 -14.2500 -170.5700 60.30 42.00 18.30 124720 SMO 1997 12 01 00 55 00 2134-66 S co CCGG 82.710 -999.990 S.. R5 1998 01 15 11 31 00 -14.2500 -170.5700 60.30 42.00 18.30 124721 SMO 1997 12 10 01 30 00 1485-91 D co CCGG 77.080 -999.990 P.. R5 1998 01 08 14 08 00 -14.2500 -170.5700 47.00 42.00 5.00 124722 SMO 1997 12 10 01 30 00 1486-91 D co CCGG 80.290 -999.990 P.. R5 1998 01 08 14 22 00 -14.2500 -170.5700 47.00 42.00 5.00 124723 SMO 1997 12 10 03 47 00 2313-66 S co CCGG 77.560 -999.990 S.. R5 1998 01 15 12 41 00 -14.2500 -170.5700 60.30 42.00 18.30 124724 SMO 1997 12 10 03 47 00 2314-66 S co CCGG 79.590 -999.990 S.. R5 1998 01 15 12 54 00 -14.2500 -170.5700 60.30 42.00 18.30 124725 SMO 1997 12 15 23 38 00 2051-66 S co CCGG 73.230 -999.990 S.. R5 1998 01 15 09 26 00 -14.2500 -170.5700 60.30 42.00 18.30 124726 SMO 1997 12 15 23 38 00 2052-66 S co CCGG 72.610 -999.990 S.. R5 1998 01 15 09 39 00 -14.2500 -170.5700 60.30 42.00 18.30 124727 SMO 1997 12 15 23 50 00 1441-91 D co CCGG 512.810 -999.990 P.C R5 1998 01 08 13 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124728 SMO 1997 12 15 23 50 00 1442-91 D co CCGG 75.440 -999.990 P.. R5 1998 01 08 13 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124729 SMO 1997 12 23 00 30 00 4143-91 D co CCGG 67.370 -999.990 ... R5 1998 01 28 12 22 00 -14.2500 -170.5700 47.00 42.00 5.00 124730 SMO 1997 12 23 00 30 00 4144-91 D co CCGG 67.190 -999.990 ... R5 1998 01 28 12 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124731 SMO 1997 12 23 02 07 00 2309-66 S co CCGG 66.370 -999.990 S.. R5 1998 01 14 15 44 00 -14.2500 -170.5700 60.30 42.00 18.30 124732 SMO 1997 12 23 02 07 00 2310-66 S co CCGG 66.720 -999.990 S.. R5 1998 01 14 15 57 00 -14.2500 -170.5700 60.30 42.00 18.30 124733 SMO 1997 12 30 01 33 00 1149-91 D co CCGG 63.730 -999.990 ... R5 1998 01 28 12 51 00 -14.2500 -170.5700 47.00 42.00 5.00 124734 SMO 1997 12 30 01 33 00 1150-91 D co CCGG 64.290 -999.990 ... R5 1998 01 28 13 05 00 -14.2500 -170.5700 47.00 42.00 5.00 124735 SMO 1998 01 06 01 45 00 1003-91 D co CCGG 90.330 -999.990 .X. R5 1998 01 28 10 18 00 -14.2500 -170.5700 47.00 42.00 5.00 124736 SMO 1998 01 06 01 45 00 1004-91 D co CCGG 90.420 -999.990 .X. R5 1998 01 28 10 32 00 -14.2500 -170.5700 47.00 42.00 5.00 124737 SMO 1998 01 06 03 10 00 2241-66 S co CCGG 92.280 -999.990 S.. R5 1998 01 22 10 20 00 -14.2500 -170.5700 60.30 42.00 18.30 124738 SMO 1998 01 06 03 10 00 2242-66 S co CCGG 93.390 -999.990 S.. R5 1998 01 22 10 33 00 -14.2500 -170.5700 60.30 42.00 18.30 124739 SMO 1998 01 13 02 30 00 4243-91 D co CCGG 67.360 -999.990 ... R5 1998 01 28 11 00 00 -14.2500 -170.5700 47.00 42.00 5.00 124740 SMO 1998 01 13 02 30 00 4244-91 D co CCGG 65.240 -999.990 ... R5 1998 01 28 11 14 00 -14.2500 -170.5700 47.00 42.00 5.00 124741 SMO 1998 01 13 04 35 00 2307-66 S co CCGG 63.060 -999.990 S.. R5 1998 02 12 13 37 00 -14.2500 -170.5700 60.30 42.00 18.30 124742 SMO 1998 01 13 04 35 00 2308-66 S co CCGG 63.720 -999.990 S.. R5 1998 02 12 13 50 00 -14.2500 -170.5700 60.30 42.00 18.30 124743 SMO 1998 01 21 00 40 00 4041-91 D co CCGG 59.250 -999.990 ... R5 1998 02 18 13 45 00 -14.2500 -170.5700 47.00 42.00 5.00 124744 SMO 1998 01 21 00 40 00 4042-91 D co CCGG 59.520 -999.990 ... R5 1998 02 18 13 59 00 -14.2500 -170.5700 47.00 42.00 5.00 124745 SMO 1998 01 21 02 20 00 2333-66 S co CCGG 56.850 -999.990 S.. R5 1998 02 12 14 04 00 -14.2500 -170.5700 60.30 42.00 18.30 124746 SMO 1998 01 21 02 20 00 2334-66 S co CCGG 57.230 -999.990 S.. R5 1998 02 12 14 18 00 -14.2500 -170.5700 60.30 42.00 18.30 124747 SMO 1998 02 04 03 35 00 4376-91 D co CCGG 54.210 -999.990 ... R5 1998 02 18 16 04 00 -14.2500 -170.5700 47.00 42.00 5.00 124748 SMO 1998 02 10 03 00 00 1417-91 D co CCGG 63.270 -999.990 ... R5 1998 03 12 12 45 00 -14.2500 -170.5700 47.00 42.00 5.00 124749 SMO 1998 02 10 03 00 00 1418-91 D co CCGG 62.610 -999.990 ... R5 1998 03 12 12 59 00 -14.2500 -170.5700 47.00 42.00 5.00 124750 SMO 1998 02 10 04 20 00 2275-66 S co CCGG 60.300 -999.990 S.. R5 1998 03 16 10 49 00 -14.2500 -170.5700 60.30 42.00 18.30 124751 SMO 1998 02 10 04 20 00 2276-66 S co CCGG 62.750 -999.990 S.. R5 1998 03 16 11 02 00 -14.2500 -170.5700 60.30 42.00 18.30 124752 SMO 1998 03 03 00 55 00 4725-91 D co CCGG 58.860 -999.990 ... R5 1998 03 12 13 40 00 -14.2500 -170.5700 47.00 42.00 5.00 124753 SMO 1998 03 03 00 55 00 4726-91 D co CCGG 57.990 -999.990 ... R5 1998 03 12 13 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124754 SMO 1998 03 03 02 00 00 2087-66 S co CCGG 54.300 -999.990 S.. R5 1998 03 16 11 16 00 -14.2500 -170.5700 60.30 42.00 18.30 124755 SMO 1998 03 03 02 00 00 2088-66 S co CCGG 54.390 -999.990 S.. R5 1998 03 16 11 30 00 -14.2500 -170.5700 60.30 42.00 18.30 124756 SMO 1998 03 11 02 35 00 149-91 D co CCGG 51.540 -999.990 ... R5 1998 04 01 11 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124757 SMO 1998 03 11 02 35 00 150-91 D co CCGG 52.000 -999.990 ... R5 1998 04 01 12 07 00 -14.2500 -170.5700 47.00 42.00 5.00 124758 SMO 1998 03 11 05 46 00 2053-66 S co CCGG 51.510 -999.990 S.. R5 1998 03 30 14 15 00 -14.2500 -170.5700 60.30 42.00 18.30 124759 SMO 1998 03 11 05 46 00 2054-66 S co CCGG 51.770 -999.990 S.. R5 1998 03 30 14 28 00 -14.2500 -170.5700 60.30 42.00 18.30 124760 SMO 1998 03 17 02 30 00 215-91 D co CCGG 61.130 -999.990 ... R5 1998 04 01 11 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124761 SMO 1998 03 17 02 30 00 216-91 D co CCGG 58.780 -999.990 ... R5 1998 04 01 11 40 00 -14.2500 -170.5700 47.00 42.00 5.00 124762 SMO 1998 03 17 04 05 00 2167-66 S co CCGG 59.450 -999.990 S.. R5 1998 03 30 15 09 00 -14.2500 -170.5700 60.30 42.00 18.30 124763 SMO 1998 03 17 04 05 00 2168-66 S co CCGG 59.070 -999.990 S.. R5 1998 03 30 15 23 00 -14.2500 -170.5700 60.30 42.00 18.30 124764 SMO 1998 03 24 00 55 00 467-91 D co CCGG 57.210 -999.990 ... R5 1998 04 09 11 53 00 -14.2500 -170.5700 47.00 42.00 5.00 124765 SMO 1998 03 24 04 00 00 2163-66 S co CCGG 56.430 -999.990 S.. R5 1998 04 09 13 30 00 -14.2500 -170.5700 60.30 42.00 18.30 124766 SMO 1998 03 24 04 00 00 2164-66 S co CCGG 56.070 -999.990 S.. R5 1998 04 09 13 44 00 -14.2500 -170.5700 60.30 42.00 18.30 124767 SMO 1998 03 31 01 15 00 4753-91 D co CCGG 56.670 -999.990 ... R5 1998 04 09 11 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124768 SMO 1998 03 31 01 15 00 4754-91 D co CCGG 55.760 -999.990 ... R5 1998 04 09 11 39 00 -14.2500 -170.5700 47.00 42.00 5.00 124769 SMO 1998 03 31 03 05 00 2081-66 S co CCGG 54.610 -999.990 S.. R5 1998 04 09 13 03 00 -14.2500 -170.5700 60.30 42.00 18.30 124770 SMO 1998 03 31 03 05 00 2082-66 S co CCGG 54.920 -999.990 S.. R5 1998 04 09 13 17 00 -14.2500 -170.5700 60.30 42.00 18.30 124771 SMO 1998 04 07 00 40 00 641-91 D co CCGG 56.240 -999.990 ... R5 1998 04 24 14 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124772 SMO 1998 04 07 00 40 00 642-91 D co CCGG 55.320 -999.990 ... R5 1998 04 24 14 50 00 -14.2500 -170.5700 47.00 42.00 5.00 124773 SMO 1998 04 07 03 05 00 2107-66 S co CCGG 54.210 -999.990 S.. R5 1998 04 24 16 27 00 -14.2500 -170.5700 60.30 42.00 18.30 124774 SMO 1998 04 07 03 05 00 2108-66 S co CCGG 53.910 -999.990 S.. R5 1998 04 24 16 41 00 -14.2500 -170.5700 60.30 42.00 18.30 124775 SMO 1998 04 14 00 50 00 4167-91 D co CCGG 61.900 -999.990 ... R5 1998 04 24 14 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124776 SMO 1998 04 14 00 50 00 4168-91 D co CCGG 63.550 -999.990 ... R5 1998 04 24 14 23 00 -14.2500 -170.5700 47.00 42.00 5.00 124777 SMO 1998 04 14 02 05 00 2345-66 S co CCGG 57.030 -999.990 S.. R5 1998 04 24 16 00 00 -14.2500 -170.5700 60.30 42.00 18.30 124778 SMO 1998 04 14 02 05 00 2346-66 S co CCGG 57.480 -999.990 S.. R5 1998 04 24 16 14 00 -14.2500 -170.5700 60.30 42.00 18.30 124779 SMO 1998 04 23 02 30 00 1315-91 D co CCGG 59.870 -999.990 ... R5 1998 05 15 09 56 00 -14.2500 -170.5700 47.00 42.00 5.00 124780 SMO 1998 04 23 02 30 00 1316-91 D co CCGG 61.060 -999.990 ... R5 1998 05 15 10 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124781 SMO 1998 05 04 23 10 00 4335-91 D co CCGG 65.850 -999.990 ... R5 1998 05 15 10 23 00 -14.2500 -170.5700 47.00 42.00 5.00 124782 SMO 1998 05 04 23 10 00 4336-91 D co CCGG 64.300 -999.990 ... R5 1998 05 15 10 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124783 SMO 1998 05 12 02 10 00 1861-91 D co CCGG 66.080 -999.990 ... R5 1998 05 27 15 34 00 -14.2500 -170.5700 47.00 42.00 5.00 124784 SMO 1998 05 12 02 10 00 1862-91 D co CCGG 64.040 -999.990 ... R5 1998 05 27 15 47 00 -14.2500 -170.5700 47.00 42.00 5.00 124785 SMO 1998 05 20 01 50 00 1843-91 D co CCGG 61.250 -999.990 ... R5 1998 05 27 15 06 00 -14.2500 -170.5700 47.00 42.00 5.00 124786 SMO 1998 05 20 01 50 00 1844-91 D co CCGG 60.360 -999.990 ... R5 1998 05 27 15 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124787 SMO 1998 05 28 01 00 00 4585-91 D co CCGG 61.620 -999.990 ... R5 1998 06 19 12 50 00 -14.2500 -170.5700 47.00 42.00 5.00 124788 SMO 1998 05 28 01 00 00 4586-91 D co CCGG 60.040 -999.990 ... R5 1998 06 19 13 03 00 -14.2500 -170.5700 47.00 42.00 5.00 124789 SMO 1998 06 02 00 15 00 1485-91 D co CCGG 68.920 -999.990 ... R5 1998 06 19 12 21 00 -14.2500 -170.5700 47.00 42.00 5.00 124790 SMO 1998 06 02 00 15 00 1486-91 D co CCGG 68.690 -999.990 ... R5 1998 06 19 12 34 00 -14.2500 -170.5700 47.00 42.00 5.00 124791 SMO 1998 06 06 02 15 00 141-91 D co CCGG 65.570 -999.990 ... R5 1998 06 24 11 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124792 SMO 1998 06 06 02 15 00 142-91 D co CCGG 65.300 -999.990 ... R5 1998 06 24 11 51 00 -14.2500 -170.5700 47.00 42.00 5.00 124793 SMO 1998 06 08 23 30 00 2043-91 D co CCGG 65.380 -999.990 ... R5 1998 06 24 12 32 00 -14.2500 -170.5700 47.00 42.00 5.00 124794 SMO 1998 06 08 23 30 00 2044-91 D co CCGG 65.480 -999.990 ... R5 1998 06 24 12 46 00 -14.2500 -170.5700 47.00 42.00 5.00 124795 SMO 1998 06 13 02 35 00 17-91 D co CCGG 69.740 -999.990 ... R5 1998 07 13 11 01 00 -14.2500 -170.5700 47.00 42.00 5.00 124796 SMO 1998 06 13 02 35 00 18-91 D co CCGG 69.420 -999.990 ... R5 1998 07 13 11 15 00 -14.2500 -170.5700 47.00 42.00 5.00 124797 SMO 1998 06 16 02 15 00 615-91 D co CCGG 63.990 -999.990 ... R5 1998 07 13 10 34 00 -14.2500 -170.5700 47.00 42.00 5.00 124798 SMO 1998 06 16 02 15 00 616-91 D co CCGG 64.110 -999.990 ... R5 1998 07 13 10 48 00 -14.2500 -170.5700 47.00 42.00 5.00 124799 SMO 1998 06 20 01 45 00 4443-91 D co CCGG 67.220 -999.990 ... R5 1998 07 01 15 35 00 -14.2500 -170.5700 47.00 42.00 5.00 124800 SMO 1998 06 20 01 45 00 4444-91 D co CCGG 66.540 -999.990 ... R5 1998 07 01 15 48 00 -14.2500 -170.5700 47.00 42.00 5.00 124801 SMO 1998 06 24 02 05 00 4531-91 D co CCGG 73.900 -999.990 ... R5 1998 07 01 16 02 00 -14.2500 -170.5700 47.00 42.00 5.00 124802 SMO 1998 06 24 02 05 00 4532-91 D co CCGG 73.340 -999.990 ... R5 1998 07 01 16 15 00 -14.2500 -170.5700 47.00 42.00 5.00 124803 SMO 1998 06 27 03 00 00 1753-91 D co CCGG 65.830 -999.990 ... R5 1998 07 13 14 45 00 -14.2500 -170.5700 47.00 42.00 5.00 124804 SMO 1998 06 27 03 00 00 1754-91 D co CCGG 65.600 -999.990 ... R5 1998 07 13 14 58 00 -14.2500 -170.5700 47.00 42.00 5.00 124805 SMO 1998 06 30 01 10 00 4642-91 D co CCGG 68.670 -999.990 ... R5 1998 07 13 16 08 00 -14.2500 -170.5700 47.00 42.00 5.00 124806 SMO 1998 07 03 01 30 00 1743-91 D co CCGG 69.960 -999.990 ... R5 1998 07 15 09 56 00 -14.2500 -170.5700 47.00 42.00 5.00 124807 SMO 1998 07 03 01 30 00 1744-91 D co CCGG 69.910 -999.990 ... R5 1998 07 15 10 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124808 SMO 1998 07 07 01 35 00 4351-91 D co CCGG 69.520 -999.990 ... R5 1998 07 15 10 23 00 -14.2500 -170.5700 47.00 42.00 5.00 124809 SMO 1998 07 07 01 35 00 4352-91 D co CCGG 68.940 -999.990 ... R5 1998 07 15 10 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124810 SMO 1998 07 15 01 35 00 4535-91 D co CCGG 71.830 -999.990 ... R5 1998 08 05 10 55 00 -14.2500 -170.5700 47.00 42.00 5.00 124811 SMO 1998 07 15 01 35 00 4536-91 D co CCGG 71.390 -999.990 ... R5 1998 08 05 11 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124812 SMO 1998 07 28 01 00 00 4417-91 D co CCGG 71.040 -999.990 ... R5 1998 08 05 11 22 00 -14.2500 -170.5700 47.00 42.00 5.00 124813 SMO 1998 07 28 01 00 00 4418-91 D co CCGG 70.890 -999.990 ... R5 1998 08 05 11 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124814 SMO 1998 08 04 02 55 00 703-91 D co CCGG 75.660 -999.990 ... R5 1998 08 26 08 35 00 -14.2500 -170.5700 47.00 42.00 5.00 124815 SMO 1998 08 04 02 55 00 704-91 D co CCGG 74.590 -999.990 ... R5 1998 08 26 08 49 00 -14.2500 -170.5700 47.00 42.00 5.00 124816 SMO 1998 08 08 02 39 00 1039-91 D co CCGG 70.460 -999.990 ... R5 1998 08 26 09 02 00 -14.2500 -170.5700 47.00 42.00 5.00 124817 SMO 1998 08 08 02 39 00 1040-91 D co CCGG 70.720 -999.990 ... R5 1998 08 26 09 16 00 -14.2500 -170.5700 47.00 42.00 5.00 124818 SMO 1998 08 12 01 42 00 375-91 D co CCGG 71.700 -999.990 ... R5 1998 08 28 13 31 00 -14.2500 -170.5700 47.00 42.00 5.00 124819 SMO 1998 08 12 01 42 00 376-91 D co CCGG 71.560 -999.990 ... R5 1998 08 28 13 45 00 -14.2500 -170.5700 47.00 42.00 5.00 124820 SMO 1998 08 18 02 15 00 1639-91 D co CCGG 77.750 -999.990 ... R5 1998 08 28 14 53 00 -14.2500 -170.5700 47.00 42.00 5.00 124821 SMO 1998 08 18 02 15 00 1640-91 D co CCGG 75.830 -999.990 ... R5 1998 08 28 15 07 00 -14.2500 -170.5700 47.00 42.00 5.00 124822 SMO 1998 08 31 22 50 00 69-91 D co CCGG 72.860 -999.990 ... R5 1998 09 22 12 34 00 -14.2500 -170.5700 47.00 42.00 5.00 124823 SMO 1998 08 31 22 50 00 70-91 D co CCGG 72.950 -999.990 ... R5 1998 09 22 12 47 00 -14.2500 -170.5700 47.00 42.00 5.00 124824 SMO 1998 09 08 22 55 00 1319-91 D co CCGG 77.870 -999.990 ... R5 1998 09 22 13 01 00 -14.2500 -170.5700 47.00 42.00 5.00 124825 SMO 1998 09 08 22 55 00 1320-91 D co CCGG 77.240 -999.990 ... R5 1998 09 22 13 15 00 -14.2500 -170.5700 47.00 42.00 5.00 124826 SMO 1998 09 15 23 20 00 1009-91 D co CCGG 75.260 -999.990 ... R5 1998 10 01 14 27 00 -14.2500 -170.5700 47.00 42.00 5.00 124827 SMO 1998 09 15 23 20 00 1010-91 D co CCGG 74.170 -999.990 ... R5 1998 10 01 14 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124828 SMO 1998 09 21 23 10 00 1241-91 D co CCGG 72.060 -999.990 ... R5 1998 10 01 14 00 00 -14.2500 -170.5700 47.00 42.00 5.00 124829 SMO 1998 09 21 23 10 00 1242-91 D co CCGG 72.560 -999.990 ... R5 1998 10 01 14 14 00 -14.2500 -170.5700 47.00 42.00 5.00 124830 SMO 1998 09 28 23 25 00 269-91 D co CCGG 76.160 -999.990 ... R5 1998 11 04 09 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124831 SMO 1998 10 03 01 40 00 4605-91 D co CCGG 75.510 -999.990 ... R5 1998 11 04 10 03 00 -14.2500 -170.5700 47.00 42.00 5.00 124832 SMO 1998 10 03 01 40 00 4606-91 D co CCGG 75.160 -999.990 ... R5 1998 11 04 10 17 00 -14.2500 -170.5700 47.00 42.00 5.00 124833 SMO 1998 10 05 23 10 00 1397-91 D co CCGG 78.810 -999.990 ... R5 1998 11 03 14 13 00 -14.2500 -170.5700 47.00 42.00 5.00 124834 SMO 1998 10 05 23 10 00 1398-91 D co CCGG 78.430 -999.990 ... R5 1998 11 03 14 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124835 SMO 1998 10 13 23 20 00 1583-91 D co CCGG 81.040 -999.990 ... R5 1998 11 03 15 34 00 -14.2500 -170.5700 47.00 42.00 5.00 124836 SMO 1998 10 13 23 20 00 1584-91 D co CCGG 79.470 -999.990 ... R5 1998 11 03 15 48 00 -14.2500 -170.5700 47.00 42.00 5.00 124837 SMO 1998 10 17 01 15 00 29-91 D co CCGG 74.030 -999.990 ... R5 1998 11 09 15 01 00 -14.2500 -170.5700 47.00 42.00 5.00 124838 SMO 1998 10 20 01 15 00 4103-91 D co CCGG 78.060 -999.990 ... R5 1998 11 09 11 48 00 -14.2500 -170.5700 47.00 42.00 5.00 124839 SMO 1998 10 20 01 15 00 4104-91 D co CCGG 76.850 -999.990 ... R5 1998 11 09 12 02 00 -14.2500 -170.5700 47.00 42.00 5.00 124840 SMO 1998 10 27 01 35 00 427-91 D co CCGG 77.650 -999.990 ... R5 1998 11 10 16 11 00 -14.2500 -170.5700 47.00 42.00 5.00 124841 SMO 1998 10 27 01 35 00 428-91 D co CCGG 76.540 -999.990 ... R5 1998 11 10 16 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124842 SMO 1998 10 31 01 50 00 431-91 D co CCGG 74.960 -999.990 ... R5 1998 11 10 15 43 00 -14.2500 -170.5700 47.00 42.00 5.00 124843 SMO 1998 10 31 01 50 00 432-91 D co CCGG 74.860 -999.990 ... R5 1998 11 10 15 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124844 SMO 1998 11 04 01 55 00 23-91 D co CCGG 74.010 -999.990 ... R5 1998 11 24 13 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124845 SMO 1998 11 04 01 55 00 24-91 D co CCGG 75.430 -999.990 ... R5 1998 11 24 13 40 00 -14.2500 -170.5700 47.00 42.00 5.00 124846 SMO 1998 11 07 00 45 00 435-91 D co CCGG 73.810 -999.990 ... R5 1998 11 24 13 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124847 SMO 1998 11 07 00 45 00 436-91 D co CCGG 73.480 -999.990 ... R5 1998 11 24 14 07 00 -14.2500 -170.5700 47.00 42.00 5.00 124848 SMO 1998 11 10 00 40 00 303-91 D co CCGG 75.390 -999.990 ... R5 1998 11 24 12 32 00 -14.2500 -170.5700 47.00 42.00 5.00 124849 SMO 1998 11 10 00 40 00 304-91 D co CCGG 75.330 -999.990 ... R5 1998 11 24 12 45 00 -14.2500 -170.5700 47.00 42.00 5.00 124850 SMO 1998 11 13 23 25 00 691-91 D co CCGG 78.040 -999.990 ... R5 1998 11 24 12 59 00 -14.2500 -170.5700 47.00 42.00 5.00 124851 SMO 1998 11 13 23 25 00 692-91 D co CCGG 78.140 -999.990 ... R5 1998 11 24 13 13 00 -14.2500 -170.5700 47.00 42.00 5.00 124852 SMO 1998 11 16 23 12 00 363-91 D co CCGG 71.250 -999.990 ... R5 1998 12 21 11 32 00 -14.2500 -170.5700 47.00 42.00 5.00 124853 SMO 1998 11 16 23 12 00 364-91 D co CCGG 71.900 -999.990 ... R5 1998 12 21 11 46 00 -14.2500 -170.5700 47.00 42.00 5.00 124854 SMO 1998 11 24 01 40 00 1133-91 D co CCGG 68.280 -999.990 ... R5 1998 12 21 09 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124855 SMO 1998 11 24 01 40 00 1134-91 D co CCGG 67.160 -999.990 ... R5 1998 12 21 09 55 00 -14.2500 -170.5700 47.00 42.00 5.00 124856 SMO 1998 12 03 00 50 00 1-91 D co CCGG 67.920 -999.990 ... R5 1999 01 07 14 26 00 -14.2500 -170.5700 47.00 42.00 5.00 124857 SMO 1998 12 03 00 50 00 2-91 D co CCGG 66.790 -999.990 ... R5 1999 01 07 14 40 00 -14.2500 -170.5700 47.00 42.00 5.00 124858 SMO 1998 12 05 01 50 00 1957-91 D co CCGG 67.790 -999.990 ... R5 1999 01 07 13 59 00 -14.2500 -170.5700 47.00 42.00 5.00 124859 SMO 1998 12 05 01 50 00 1958-91 D co CCGG 67.050 -999.990 ... R5 1999 01 07 14 13 00 -14.2500 -170.5700 47.00 42.00 5.00 124860 SMO 1998 12 08 01 30 00 851-91 D co CCGG 69.290 -999.990 ... R5 1999 01 07 15 23 00 -14.2500 -170.5700 47.00 42.00 5.00 124861 SMO 1998 12 08 01 30 00 852-91 D co CCGG 68.430 -999.990 ... R5 1999 01 07 15 36 00 -14.2500 -170.5700 47.00 42.00 5.00 124862 SMO 1998 12 15 01 05 00 4411-91 D co CCGG 64.130 -999.990 ... R5 1999 01 07 14 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124863 SMO 1998 12 15 01 05 00 4412-91 D co CCGG 64.360 -999.990 ... R5 1999 01 07 15 07 00 -14.2500 -170.5700 47.00 42.00 5.00 124864 SMO 1998 12 23 03 20 00 1167-91 D co CCGG 70.940 -999.990 ... R5 1999 01 14 09 41 00 -14.2500 -170.5700 47.00 42.00 5.00 124865 SMO 1998 12 23 03 20 00 1167-91 D co CCGG 71.420 -999.990 ... R5 1999 01 14 10 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124865 SMO 1998 12 23 03 20 00 1168-91 D co CCGG 70.850 -999.990 ... R5 1999 01 14 09 54 00 -14.2500 -170.5700 47.00 42.00 5.00 124866 SMO 1998 12 23 03 20 00 1168-91 D co CCGG 71.160 -999.990 ... R5 1999 01 14 10 50 00 -14.2500 -170.5700 47.00 42.00 5.00 124866 SMO 1998 12 23 03 50 00 2051-66 S co CCGG 70.390 -999.990 S.. R5 1999 01 22 15 24 00 -14.2500 -170.5700 60.30 42.00 18.30 124867 SMO 1998 12 23 03 50 00 2052-66 S co CCGG 95.280 -999.990 S.. R5 1999 01 22 15 37 00 -14.2500 -170.5700 60.30 42.00 18.30 124868 SMO 1998 12 31 02 25 00 4321-91 D co CCGG 73.940 -999.990 ... R5 1999 01 14 09 13 00 -14.2500 -170.5700 47.00 42.00 5.00 124869 SMO 1998 12 31 02 25 00 4321-91 D co CCGG 73.570 -999.990 ... R5 1999 01 14 11 04 00 -14.2500 -170.5700 47.00 42.00 5.00 124869 SMO 1998 12 31 02 25 00 4322-91 D co CCGG 71.900 -999.990 ... R5 1999 01 14 09 27 00 -14.2500 -170.5700 47.00 42.00 5.00 124870 SMO 1998 12 31 02 25 00 4322-91 D co CCGG 72.610 -999.990 ... R5 1999 01 14 11 18 00 -14.2500 -170.5700 47.00 42.00 5.00 124870 SMO 1998 12 31 03 10 00 2153-66 S co CCGG 66.990 -999.990 S.. R5 1999 01 22 16 26 00 -14.2500 -170.5700 60.30 42.00 18.30 124871 SMO 1998 12 31 03 10 00 2154-66 S co CCGG 65.550 -999.990 S.. R5 1999 01 22 16 40 00 -14.2500 -170.5700 60.30 42.00 18.30 124872 SMO 1999 01 05 02 40 00 185-91 D co CCGG 62.880 -999.990 ... R5 1999 02 10 10 35 00 -14.2500 -170.5700 47.00 42.00 5.00 124873 SMO 1999 01 05 02 40 00 186-91 D co CCGG 62.120 -999.990 ... R5 1999 02 10 10 48 00 -14.2500 -170.5700 47.00 42.00 5.00 124874 SMO 1999 01 05 03 15 00 2017-66 S co CCGG 58.280 -999.990 S.. R5 1999 01 22 16 53 00 -14.2500 -170.5700 60.30 42.00 18.30 124875 SMO 1999 01 12 03 35 00 2213-66 S co CCGG 76.110 -999.990 S.. R5 1999 01 22 14 56 00 -14.2500 -170.5700 60.30 42.00 18.30 124876 SMO 1999 01 12 03 35 00 2214-66 S co CCGG 76.180 -999.990 S.. R5 1999 01 22 15 10 00 -14.2500 -170.5700 60.30 42.00 18.30 124877 SMO 1999 01 19 03 10 00 2225-66 S co CCGG 73.050 -999.990 S.. R5 1999 02 08 11 29 00 -14.2500 -170.5700 60.30 42.00 18.30 124878 SMO 1999 01 19 03 10 00 2226-66 S co CCGG 81.360 -999.990 S.. R5 1999 02 08 11 42 00 -14.2500 -170.5700 60.30 42.00 18.30 124879 SMO 1999 01 27 01 50 00 825-91 D co CCGG 64.970 -999.990 ... R5 1999 02 10 09 05 00 -14.2500 -170.5700 47.00 42.00 5.00 124880 SMO 1999 01 27 01 50 00 826-91 D co CCGG 64.020 -999.990 ... R5 1999 02 10 09 19 00 -14.2500 -170.5700 47.00 42.00 5.00 124881 SMO 1999 01 27 02 45 00 2366-66 S co CCGG 63.510 -999.990 S.. R5 1999 02 08 11 56 00 -14.2500 -170.5700 60.30 42.00 18.30 124882 SMO 1999 02 02 02 15 00 303-91 D co CCGG 58.650 -999.990 ... R5 1999 02 19 12 43 00 -14.2500 -170.5700 47.00 42.00 5.00 124883 SMO 1999 02 02 02 15 00 304-91 D co CCGG 59.550 -999.990 ... R5 1999 02 19 12 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124884 SMO 1999 02 02 03 05 00 2275-66 S co CCGG 59.550 -999.990 S.. R5 1999 02 19 10 22 00 -14.2500 -170.5700 60.30 42.00 18.30 124885 SMO 1999 02 02 03 05 00 2276-66 S co CCGG 61.340 -999.990 S.. R5 1999 02 19 10 36 00 -14.2500 -170.5700 60.30 42.00 18.30 124886 SMO 1999 02 08 22 45 00 611-91 D co CCGG 68.700 -999.990 ... R5 1999 02 19 13 10 00 -14.2500 -170.5700 47.00 42.00 5.00 124887 SMO 1999 02 08 22 45 00 612-91 D co CCGG 68.970 -999.990 ... R5 1999 02 19 13 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124888 SMO 1999 02 08 23 45 00 2301-66 S co CCGG 71.700 -999.990 S.. R5 1999 02 19 09 55 00 -14.2500 -170.5700 60.30 42.00 18.30 124889 SMO 1999 02 08 23 45 00 2302-66 S co CCGG 71.360 -999.990 S.. R5 1999 02 19 10 09 00 -14.2500 -170.5700 60.30 42.00 18.30 124890 SMO 1999 02 19 00 50 00 643-91 D co CCGG 70.880 -999.990 ... R5 1999 03 05 13 44 00 -14.2500 -170.5700 47.00 42.00 5.00 124891 SMO 1999 02 19 00 50 00 644-91 D co CCGG 69.720 -999.990 ... R5 1999 03 05 13 58 00 -14.2500 -170.5700 47.00 42.00 5.00 124892 SMO 1999 02 19 01 35 00 2107-66 S co CCGG 69.100 -999.990 S.. R5 1999 03 31 14 37 00 -14.2500 -170.5700 60.30 42.00 18.30 124893 SMO 1999 02 19 01 35 00 2108-66 S co CCGG 69.760 -999.990 S.. R5 1999 03 31 14 51 00 -14.2500 -170.5700 60.30 42.00 18.30 124894 SMO 1999 02 25 01 38 00 4623-91 D co CCGG 50.380 -999.990 ... R5 1999 03 05 13 17 00 -14.2500 -170.5700 47.00 42.00 5.00 124895 SMO 1999 02 25 01 38 00 4624-91 D co CCGG 49.080 -999.990 ... R5 1999 03 05 13 31 00 -14.2500 -170.5700 47.00 42.00 5.00 124896 SMO 1999 02 25 02 35 00 2345-66 S co CCGG 58.690 -999.990 S.. R5 1999 03 31 14 01 00 -14.2500 -170.5700 60.30 42.00 18.30 124897 SMO 1999 02 25 02 35 00 2346-66 S co CCGG 59.470 -999.990 S.. R5 1999 03 31 14 15 00 -14.2500 -170.5700 60.30 42.00 18.30 124898 SMO 1999 03 02 01 35 00 445-91 D co CCGG 59.790 -999.990 ... R5 1999 03 23 11 44 00 -14.2500 -170.5700 47.00 42.00 5.00 124899 SMO 1999 03 02 01 35 00 446-91 D co CCGG 59.330 -999.990 ... R5 1999 03 23 11 58 00 -14.2500 -170.5700 47.00 42.00 5.00 124900 SMO 1999 03 02 02 32 00 2021-66 S co CCGG 59.500 -999.990 S.. R5 1999 04 07 16 27 00 -14.2500 -170.5700 60.30 42.00 18.30 124901 SMO 1999 03 11 01 35 00 4525-91 D co CCGG 52.890 -999.990 ... R5 1999 03 23 10 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124902 SMO 1999 03 11 01 35 00 4526-91 D co CCGG 52.740 -999.990 ... R5 1999 03 23 10 34 00 -14.2500 -170.5700 47.00 42.00 5.00 124903 SMO 1999 03 24 01 45 00 719-91 D co CCGG 57.840 -999.990 ... R5 1999 04 09 09 25 00 -14.2500 -170.5700 47.00 42.00 5.00 124904 SMO 1999 03 24 01 45 00 720-91 D co CCGG 57.650 -999.990 ... R5 1999 04 09 09 39 00 -14.2500 -170.5700 47.00 42.00 5.00 124905 SMO 1999 03 24 02 40 00 2031-66 S co CCGG 60.940 -999.990 S.. R5 1999 04 09 13 36 00 -14.2500 -170.5700 60.30 42.00 18.30 124906 SMO 1999 03 24 02 40 00 2032-66 S co CCGG 59.490 -999.990 S.. R5 1999 04 09 13 49 00 -14.2500 -170.5700 60.30 42.00 18.30 124907 SMO 1999 04 01 00 45 00 1683-91 D co CCGG 54.680 -999.990 ... R5 1999 04 09 10 20 00 -14.2500 -170.5700 47.00 42.00 5.00 124908 SMO 1999 04 01 00 45 00 1684-91 D co CCGG 55.390 -999.990 ... R5 1999 04 09 10 33 00 -14.2500 -170.5700 47.00 42.00 5.00 124909 SMO 1999 04 01 01 40 00 2311-66 S co CCGG 58.840 -999.990 S.. R5 1999 04 09 14 30 00 -14.2500 -170.5700 60.30 42.00 18.30 124910 SMO 1999 04 01 01 40 00 2312-66 S co CCGG 55.610 -999.990 S.. R5 1999 04 09 14 44 00 -14.2500 -170.5700 60.30 42.00 18.30 124911 SMO 1999 04 06 02 00 00 1315-91 D co CCGG 51.150 -999.990 ... R5 1999 05 24 10 33 00 -14.2500 -170.5700 47.00 42.00 5.00 124912 SMO 1999 04 06 02 00 00 1316-91 D co CCGG 50.160 -999.990 ... R5 1999 05 24 10 46 00 -14.2500 -170.5700 47.00 42.00 5.00 124913 SMO 1999 04 12 22 20 00 4757-91 D co CCGG 58.840 -999.990 ... R5 1999 05 24 10 05 00 -14.2500 -170.5700 47.00 42.00 5.00 124914 SMO 1999 04 12 22 20 00 4758-91 D co CCGG 58.860 -999.990 ... R5 1999 05 24 10 19 00 -14.2500 -170.5700 47.00 42.00 5.00 124915 SMO 1999 04 20 01 15 00 447-91 D co CCGG 62.870 -999.990 ... R5 1999 05 11 14 50 00 -14.2500 -170.5700 47.00 42.00 5.00 124916 SMO 1999 04 20 01 15 00 448-91 D co CCGG 61.580 -999.990 ... R5 1999 05 11 15 03 00 -14.2500 -170.5700 47.00 42.00 5.00 124917 SMO 1999 04 20 01 45 00 2241-66 S co CCGG 67.590 -999.990 S.. R5 1999 05 25 13 02 00 -14.2500 -170.5700 60.30 42.00 18.30 124918 SMO 1999 04 20 01 45 00 2242-66 S co CCGG 68.200 -999.990 S.. R5 1999 05 25 13 16 00 -14.2500 -170.5700 60.30 42.00 18.30 124919 SMO 1999 04 27 00 45 00 673-91 D co CCGG 65.240 -999.990 ... R5 1999 05 11 15 17 00 -14.2500 -170.5700 47.00 42.00 5.00 124920 SMO 1999 04 27 00 45 00 674-91 D co CCGG 65.280 -999.990 ... R5 1999 05 11 15 31 00 -14.2500 -170.5700 47.00 42.00 5.00 124921 SMO 1999 04 27 01 40 00 2257-66 S co CCGG 67.010 -999.990 S.. R5 1999 05 25 13 29 00 -14.2500 -170.5700 60.30 42.00 18.30 124922 SMO 1999 04 27 01 40 00 2258-66 S co CCGG 66.980 -999.990 S.. R5 1999 05 25 13 43 00 -14.2500 -170.5700 60.30 42.00 18.30 124923 SMO 1999 05 04 03 35 00 1907-91 D co CCGG 57.200 -999.990 ... R5 1999 06 09 10 00 00 -14.2500 -170.5700 47.00 42.00 5.00 124924 SMO 1999 05 04 03 35 00 1908-91 D co CCGG 57.830 -999.990 ... R5 1999 06 09 10 14 00 -14.2500 -170.5700 47.00 42.00 5.00 124925 SMO 1999 05 18 01 00 00 4585-91 D co CCGG 61.740 -999.990 ... R5 1999 06 09 09 30 00 -14.2500 -170.5700 47.00 42.00 5.00 124926 SMO 1999 05 18 01 00 00 4586-91 D co CCGG 59.780 -999.990 ... R5 1999 06 09 09 44 00 -14.2500 -170.5700 47.00 42.00 5.00 124927 SMO 1999 05 26 03 30 00 2003-91 D co CCGG 63.990 -999.990 ... R5 1999 06 09 11 51 00 -14.2500 -170.5700 47.00 42.00 5.00 124928 SMO 1999 05 26 03 30 00 2004-91 D co CCGG 64.260 -999.990 ... R5 1999 06 09 12 05 00 -14.2500 -170.5700 47.00 42.00 5.00 124929 SMO 1999 05 26 04 40 00 2311-66 S co CCGG 56.670 -999.990 S.. R5 1999 06 08 09 28 00 -14.2500 -170.5700 60.30 42.00 18.30 124930 SMO 1999 05 26 04 40 00 2365-66 S co CCGG 55.730 -999.990 S.. R5 1999 06 08 09 41 00 -14.2500 -170.5700 60.30 42.00 18.30 124931 SMO 1999 06 03 02 30 00 4579-91 D co CCGG 65.850 -999.990 ... R5 1999 06 09 12 18 00 -14.2500 -170.5700 47.00 42.00 5.00 124932 SMO 1999 06 03 02 30 00 4580-91 D co CCGG 66.740 -999.990 ... R5 1999 06 09 12 32 00 -14.2500 -170.5700 47.00 42.00 5.00 124933 SMO 1999 06 09 02 30 00 159-98 D co CCGG 57.390 -999.990 ... R5 1999 07 01 10 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124934 SMO 1999 06 09 02 30 00 160-98 D co CCGG 57.310 -999.990 ... R5 1999 07 01 10 50 00 -14.2500 -170.5700 47.00 42.00 5.00 124935 SMO 1999 06 09 04 40 00 2183-66 S co CCGG 60.760 -999.990 S.. R5 1999 07 06 11 47 00 -14.2500 -170.5700 60.30 42.00 18.30 124936 SMO 1999 06 09 04 40 00 2184-66 S co CCGG 61.690 -999.990 S.. R5 1999 07 06 12 01 00 -14.2500 -170.5700 60.30 42.00 18.30 124937 SMO 1999 06 16 03 45 00 161-98 D co CCGG 57.260 -999.990 ... R5 1999 06 30 14 16 00 -14.2500 -170.5700 47.00 42.00 5.00 124938 SMO 1999 06 16 03 45 00 162-98 D co CCGG 57.760 -999.990 ... R5 1999 06 30 14 29 00 -14.2500 -170.5700 47.00 42.00 5.00 124939 SMO 1999 06 16 05 40 00 2267-66 S co CCGG 60.640 -999.990 S.. R5 1999 07 06 12 15 00 -14.2500 -170.5700 60.30 42.00 18.30 124940 SMO 1999 06 16 05 40 00 2268-66 S co CCGG 61.580 -999.990 S.. R5 1999 07 06 12 28 00 -14.2500 -170.5700 60.30 42.00 18.30 124941 SMO 1999 06 29 01 40 00 493-91 D co CCGG 59.810 -999.990 ... R5 1999 07 27 09 09 00 -14.2500 -170.5700 47.00 42.00 5.00 124942 SMO 1999 06 29 01 40 00 494-91 D co CCGG 59.710 -999.990 ... R5 1999 07 27 09 23 00 -14.2500 -170.5700 47.00 42.00 5.00 124943 SMO 1999 06 29 04 05 00 2103-66 S co CCGG 63.610 -999.990 S.. R5 1999 07 19 11 55 00 -14.2500 -170.5700 60.30 42.00 18.30 124944 SMO 1999 07 06 01 00 00 1935-91 D co CCGG 58.650 -999.990 ... R5 1999 07 27 09 37 00 -14.2500 -170.5700 47.00 42.00 5.00 124945 SMO 1999 07 06 01 00 00 1936-91 D co CCGG 59.200 -999.990 ... R5 1999 07 27 09 50 00 -14.2500 -170.5700 47.00 42.00 5.00 124946 SMO 1999 07 06 01 40 00 2207-66 S co CCGG 63.200 -999.990 S.. R5 1999 07 19 10 33 00 -14.2500 -170.5700 60.30 42.00 18.30 124947 SMO 1999 07 06 01 40 00 2208-66 S co CCGG 61.990 -999.990 S.. R5 1999 07 19 10 47 00 -14.2500 -170.5700 60.30 42.00 18.30 124948 SMO 1999 07 14 00 35 00 545-91 D co CCGG 57.350 -999.990 ... R5 1999 08 04 10 10 00 -14.2500 -170.5700 47.00 42.00 5.00 124949 SMO 1999 07 14 00 35 00 546-91 D co CCGG 56.930 -999.990 ... R5 1999 08 04 10 24 00 -14.2500 -170.5700 47.00 42.00 5.00 124950 SMO 1999 07 14 03 45 00 2333-66 S co CCGG 58.380 -999.990 S.. R5 1999 08 03 10 52 00 -14.2500 -170.5700 60.30 42.00 18.30 124951 SMO 1999 07 14 03 45 00 2334-66 S co CCGG 58.650 -999.990 S.. R5 1999 08 03 11 06 00 -14.2500 -170.5700 60.30 42.00 18.30 124952 SMO 1999 07 20 03 05 00 4663-91 D co CCGG 57.650 -999.990 ... R5 1999 08 04 09 43 00 -14.2500 -170.5700 47.00 42.00 5.00 124953 SMO 1999 07 20 03 05 00 4664-91 D co CCGG 56.220 -999.990 ... R5 1999 08 04 09 57 00 -14.2500 -170.5700 47.00 42.00 5.00 124954 SMO 1999 07 20 03 45 00 2345-66 S co CCGG 60.810 -999.990 S.. R5 1999 08 03 11 20 00 -14.2500 -170.5700 60.30 42.00 18.30 124955 SMO 1999 07 20 03 45 00 2346-66 S co CCGG 63.840 -999.990 S.. R5 1999 08 03 11 33 00 -14.2500 -170.5700 60.30 42.00 18.30 124956 SMO 1999 07 27 02 00 00 521-91 D co CCGG 59.770 -999.990 ... R5 1999 08 19 16 11 00 -14.2500 -170.5700 47.00 42.00 5.00 124957 SMO 1999 07 27 02 00 00 522-91 D co CCGG 58.980 -999.990 ... R5 1999 08 19 16 25 00 -14.2500 -170.5700 47.00 42.00 5.00 124958 SMO 1999 07 27 02 45 00 2275-66 S co CCGG 60.940 -999.990 S.. R5 1999 08 18 14 15 00 -14.2500 -170.5700 60.30 42.00 18.30 124959 SMO 1999 07 27 02 45 00 2276-66 S co CCGG 61.180 -999.990 S.. R5 1999 08 18 14 29 00 -14.2500 -170.5700 60.30 42.00 18.30 124960 SMO 1999 08 03 01 20 00 1223-91 D co CCGG 56.530 -999.990 ... R5 1999 08 19 14 49 00 -14.2500 -170.5700 47.00 42.00 5.00 124961 SMO 1999 08 03 01 20 00 1224-91 D co CCGG 56.070 -999.990 ... R5 1999 08 19 15 03 00 -14.2500 -170.5700 47.00 42.00 5.00 124962 SMO 1999 08 03 02 40 00 2307-66 S co CCGG 60.130 -999.990 S.. R5 1999 08 18 15 37 00 -14.2500 -170.5700 60.30 42.00 18.30 124963 SMO 1999 08 03 02 40 00 2308-66 S co CCGG 59.400 -999.990 S.. R5 1999 08 18 15 51 00 -14.2500 -170.5700 60.30 42.00 18.30 124964 SMO 1999 08 10 02 15 00 229-91 D co CCGG 59.910 -999.990 ... R5 1999 08 26 14 10 00 -14.2500 -170.5700 47.00 42.00 5.00 124965 SMO 1999 08 10 02 15 00 230-91 D co CCGG 58.690 -999.990 ... R5 1999 08 26 14 23 00 -14.2500 -170.5700 47.00 42.00 5.00 124966 SMO 1999 08 10 03 10 00 2053-66 S co CCGG 63.180 -999.990 S.. R5 1999 09 23 15 51 00 -14.2500 -170.5700 60.30 42.00 18.30 124967 SMO 1999 08 10 03 10 00 2054-66 S co CCGG 61.560 -999.990 S.. R5 1999 09 23 16 04 00 -14.2500 -170.5700 60.30 42.00 18.30 124968 SMO 1999 08 17 01 20 00 379-91 D co CCGG 58.890 -999.990 ... R5 1999 08 26 13 15 00 -14.2500 -170.5700 47.00 42.00 5.00 124969 SMO 1999 08 17 01 20 00 380-91 D co CCGG 58.630 -999.990 ... R5 1999 08 26 13 29 00 -14.2500 -170.5700 47.00 42.00 5.00 124970 SMO 1999 08 17 02 15 00 2093-66 S co CCGG 60.570 -999.990 S.. R5 1999 09 23 14 56 00 -14.2500 -170.5700 60.30 42.00 18.30 124971 SMO 1999 08 17 02 15 00 2094-66 S co CCGG 64.050 -999.990 S.. R5 1999 09 23 15 10 00 -14.2500 -170.5700 60.30 42.00 18.30 124972 SMO 1999 08 25 03 10 00 2041-66 S co CCGG 65.940 -999.990 S.. R5 1999 09 13 13 51 00 -14.2500 -170.5700 60.30 42.00 18.30 124973 SMO 1999 08 25 03 10 00 2042-66 S co CCGG 65.400 -999.990 S.. R5 1999 09 13 14 05 00 -14.2500 -170.5700 60.30 42.00 18.30 124974 SMO 1999 08 31 01 25 00 1065-91 D co CCGG 61.060 -999.990 ... R5 1999 09 13 14 34 00 -14.2500 -170.5700 47.00 42.00 5.00 124975 SMO 1999 08 31 01 25 00 1066-91 D co CCGG 60.290 -999.990 ... R5 1999 09 13 14 47 00 -14.2500 -170.5700 47.00 42.00 5.00 124976 SMO 1999 08 31 02 20 00 2312-66 S co CCGG 62.780 -999.990 S.. R5 1999 09 13 14 18 00 -14.2500 -170.5700 60.30 42.00 18.30 124977 SMO 1999 09 09 00 50 00 1043-91 D co CCGG 63.660 -999.990 ... R5 1999 09 23 13 05 00 -14.2500 -170.5700 47.00 42.00 5.00 124978 SMO 1999 09 09 00 50 00 1044-91 D co CCGG 64.400 -999.990 ... R5 1999 09 23 13 19 00 -14.2500 -170.5700 47.00 42.00 5.00 124979 SMO 1999 09 09 01 20 00 2133-66 S co CCGG 69.710 -999.990 S.. R5 1999 09 28 13 09 00 -14.2500 -170.5700 60.30 42.00 18.30 124980 SMO 1999 09 09 01 20 00 2134-66 S co CCGG 69.640 -999.990 S.. R5 1999 09 28 13 22 00 -14.2500 -170.5700 60.30 42.00 18.30 124981 SMO 1999 09 17 01 10 00 2163-66 S co CCGG 73.650 -999.990 S.. R5 1999 09 28 13 36 00 -14.2500 -170.5700 60.30 42.00 18.30 124982 SMO 1999 09 17 01 10 00 2164-66 S co CCGG 71.630 -999.990 S.. R5 1999 09 28 13 50 00 -14.2500 -170.5700 60.30 42.00 18.30 124983 SMO 1999 09 17 01 35 00 2019-91 D co CCGG 66.680 -999.990 ... R5 1999 09 23 12 38 00 -14.2500 -170.5700 47.00 42.00 5.00 124984 SMO 1999 09 17 01 35 00 2020-91 D co CCGG 68.000 -999.990 ... R5 1999 09 23 12 51 00 -14.2500 -170.5700 47.00 42.00 5.00 124985 SMO 1999 09 22 03 00 00 6395-66 D co CCGG 86.150 -999.990 .X. R5 1999 10 12 14 33 00 -14.2500 -170.5700 47.00 42.00 5.00 124986 SMO 1999 09 22 03 00 00 6396-66 D co CCGG 84.780 -999.990 .X. R5 1999 10 12 14 47 00 -14.2500 -170.5700 47.00 42.00 5.00 124987 SMO 1999 09 22 03 25 00 2019-66 S co CCGG 87.580 -999.990 S.. R5 1999 10 12 14 06 00 -14.2500 -170.5700 60.30 42.00 18.30 124988 SMO 1999 09 22 03 25 00 2020-66 S co CCGG 88.220 -999.990 S.. R5 1999 10 12 14 19 00 -14.2500 -170.5700 60.30 42.00 18.30 124989 SMO 1999 09 28 02 25 00 2267-66 S co CCGG 71.770 -999.990 S.. R5 1999 10 12 13 37 00 -14.2500 -170.5700 60.30 42.00 18.30 124991 SMO 1999 09 28 02 25 00 2268-66 S co CCGG 73.250 -999.990 S.. R5 1999 10 12 13 50 00 -14.2500 -170.5700 60.30 42.00 18.30 124992 SMO 1999 10 06 02 15 00 6451-66 D co CCGG 72.590 -999.990 ... R5 1999 10 27 13 21 00 -14.2500 -170.5700 47.00 42.00 5.00 124993 SMO 1999 10 06 02 15 00 6452-66 D co CCGG 71.790 -999.990 ... R5 1999 10 27 13 35 00 -14.2500 -170.5700 47.00 42.00 5.00 124994 SMO 1999 10 06 03 45 00 2031-66 S co CCGG 74.500 -999.990 S.. R5 1999 10 26 15 26 00 -14.2500 -170.5700 60.30 42.00 18.30 124995 SMO 1999 10 06 03 45 00 2032-66 S co CCGG 73.790 -999.990 S.. R5 1999 10 26 15 40 00 -14.2500 -170.5700 60.30 42.00 18.30 124996 SMO 1999 10 14 02 30 00 6753-66 D co CCGG 70.840 -999.990 ... R5 1999 10 27 13 49 00 -14.2500 -170.5700 47.00 42.00 5.00 124997 SMO 1999 10 14 02 30 00 6754-66 D co CCGG 71.360 -999.990 ... R5 1999 10 27 14 02 00 -14.2500 -170.5700 47.00 42.00 5.00 124998 SMO 1999 10 14 03 00 00 2077-66 S co CCGG 72.110 -999.990 S.. R5 1999 10 26 14 59 00 -14.2500 -170.5700 60.30 42.00 18.30 124999 SMO 1999 10 14 03 00 00 2078-66 S co CCGG 73.140 -999.990 S.. R5 1999 10 26 15 12 00 -14.2500 -170.5700 60.30 42.00 18.30 125000 SMO 1999 10 19 01 00 00 1671-91 D co CCGG 74.570 -999.990 P.. R5 1999 11 09 12 05 00 -14.2500 -170.5700 47.00 42.00 5.00 125001 SMO 1999 10 19 01 00 00 1672-91 D co CCGG 71.160 -999.990 P.. R5 1999 11 09 12 18 00 -14.2500 -170.5700 47.00 42.00 5.00 125002 SMO 1999 10 19 01 20 00 2051-66 S co CCGG 77.180 -999.990 S.. R5 1999 11 12 10 47 00 -14.2500 -170.5700 60.30 42.00 18.30 125003 SMO 1999 10 19 01 20 00 2052-66 S co CCGG 77.470 -999.990 S.. R5 1999 11 12 11 01 00 -14.2500 -170.5700 60.30 42.00 18.30 125004 SMO 1999 10 26 02 00 00 4721-91 D co CCGG 69.300 -999.990 ... R5 1999 11 04 16 01 00 -14.2500 -170.5700 47.00 42.00 5.00 125005 SMO 1999 10 26 02 00 00 4722-91 D co CCGG 68.870 -999.990 ... R5 1999 11 04 16 15 00 -14.2500 -170.5700 47.00 42.00 5.00 125006 SMO 1999 10 26 03 20 00 2131-66 S co CCGG 85.530 -999.990 S.. R5 1999 11 12 11 14 00 -14.2500 -170.5700 60.30 42.00 18.30 125007 SMO 1999 10 26 03 20 00 2132-66 S co CCGG 92.370 -999.990 S.. R5 1999 11 12 11 28 00 -14.2500 -170.5700 60.30 42.00 18.30 125008 SMO 1999 11 02 02 05 00 6559-66 D co CCGG 74.410 -999.990 ... R5 1999 11 23 13 25 00 -14.2500 -170.5700 47.00 42.00 5.00 125009 SMO 1999 11 02 02 05 00 6560-66 D co CCGG 76.100 -999.990 ... R5 1999 11 23 13 38 00 -14.2500 -170.5700 47.00 42.00 5.00 125010 SMO 1999 11 02 03 10 00 2257-66 S co CCGG 81.390 -999.990 S.. R5 1999 11 26 10 25 00 -14.2500 -170.5700 60.30 42.00 18.30 125011 SMO 1999 11 02 03 10 00 2258-66 S co CCGG 80.920 -999.990 S.. R5 1999 11 26 10 39 00 -14.2500 -170.5700 60.30 42.00 18.30 125012 SMO 1999 11 09 02 15 00 6907-66 D co CCGG 65.990 -999.990 ... R5 1999 11 23 12 57 00 -14.2500 -170.5700 47.00 42.00 5.00 125013 SMO 1999 11 09 02 15 00 6908-66 D co CCGG 65.950 -999.990 ... R5 1999 11 23 13 11 00 -14.2500 -170.5700 47.00 42.00 5.00 125014 SMO 1999 11 09 03 15 00 2267-66 S co CCGG 68.400 -999.990 S.. R5 1999 11 26 09 58 00 -14.2500 -170.5700 60.30 42.00 18.30 125015 SMO 1999 11 09 03 15 00 2268-66 S co CCGG 67.480 -999.990 S.. R5 1999 11 26 10 12 00 -14.2500 -170.5700 60.30 42.00 18.30 125016 SMO 1999 11 16 03 15 00 6061-66 D co CCGG 70.220 -999.990 ... R5 1999 12 07 16 09 00 -14.2500 -170.5700 47.00 42.00 5.00 125017 SMO 1999 11 16 03 15 00 6062-66 D co CCGG 71.690 -999.990 ... R5 1999 12 07 16 23 00 -14.2500 -170.5700 47.00 42.00 5.00 125018 SMO 1999 11 16 04 10 00 2275-66 S co CCGG 74.600 -999.990 S.. R5 1999 12 21 15 48 00 -14.2500 -170.5700 60.30 42.00 18.30 125019 SMO 1999 11 16 04 10 00 2276-66 S co CCGG 72.880 -999.990 S.. R5 1999 12 21 16 01 00 -14.2500 -170.5700 60.30 42.00 18.30 125020 SMO 1999 11 23 02 10 00 6493-66 D co CCGG 65.080 -999.990 ... R5 1999 12 07 15 42 00 -14.2500 -170.5700 47.00 42.00 5.00 125021 SMO 1999 11 23 02 10 00 6494-66 D co CCGG 62.520 -999.990 ... R5 1999 12 07 15 56 00 -14.2500 -170.5700 47.00 42.00 5.00 125022 SMO 1999 11 23 03 10 00 2345-66 S co CCGG 66.770 -999.990 S.. R5 1999 12 21 15 20 00 -14.2500 -170.5700 60.30 42.00 18.30 125023 SMO 1999 11 23 03 10 00 2346-66 S co CCGG 73.100 -999.990 S.. R5 1999 12 21 15 34 00 -14.2500 -170.5700 60.30 42.00 18.30 125024 SMO 1999 12 07 02 25 00 6053-66 D co CCGG 62.000 -999.990 ... R5 2000 01 05 14 04 00 -14.2500 -170.5700 47.00 42.00 5.00 125025 SMO 1999 12 07 02 25 00 6054-66 D co CCGG 62.610 -999.990 ... R5 2000 01 05 14 18 00 -14.2500 -170.5700 47.00 42.00 5.00 125026 SMO 1999 12 07 03 10 00 2054-66 S co CCGG 65.150 -999.990 S.. R5 2000 01 10 14 25 00 -14.2500 -170.5700 60.30 42.00 18.30 125027 SMO 1999 12 14 02 40 00 6701-66 D co CCGG 61.120 -999.990 ... R5 2000 01 05 13 37 00 -14.2500 -170.5700 47.00 42.00 5.00 125028 SMO 1999 12 14 02 40 00 6702-66 D co CCGG 60.820 -999.990 ... R5 2000 01 05 13 51 00 -14.2500 -170.5700 47.00 42.00 5.00 125029 SMO 1999 12 14 04 10 00 2207-66 S co CCGG 61.420 -999.990 S.. R5 2000 01 10 11 46 00 -14.2500 -170.5700 60.30 42.00 18.30 125030 SMO 1999 12 14 04 10 00 2208-66 S co CCGG 61.280 -999.990 S.. R5 2000 01 10 11 59 00 -14.2500 -170.5700 60.30 42.00 18.30 125031 SMO 1999 12 22 02 40 00 633-91 D co CCGG 56.060 -999.990 ... R5 2000 01 12 10 21 00 -14.2500 -170.5700 47.00 42.00 5.00 125032 SMO 1999 12 22 02 40 00 634-91 D co CCGG 55.260 -999.990 ... R5 2000 01 12 10 35 00 -14.2500 -170.5700 47.00 42.00 5.00 125033 SMO 1999 12 22 03 20 00 2087-66 S co CCGG 58.650 -999.990 S.. R5 2000 01 10 12 13 00 -14.2500 -170.5700 60.30 42.00 18.30 125034 SMO 1999 12 22 03 20 00 2088-66 S co CCGG 58.010 -999.990 S.. R5 2000 01 10 12 26 00 -14.2500 -170.5700 60.30 42.00 18.30 125035 SMO 1999 12 29 01 20 00 4245-91 D co CCGG 63.100 -999.990 ... R5 2000 01 12 11 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125036 SMO 1999 12 29 01 20 00 4246-91 D co CCGG 61.720 -999.990 ... R5 2000 01 12 11 58 00 -14.2500 -170.5700 47.00 42.00 5.00 125037 SMO 1999 12 29 03 10 00 2107-66 S co CCGG 63.390 -999.990 S.. R5 2000 01 10 13 57 00 -14.2500 -170.5700 60.30 42.00 18.30 125038 SMO 1999 12 29 03 10 00 2108-66 S co CCGG 64.740 -999.990 S.. R5 2000 01 10 14 11 00 -14.2500 -170.5700 60.30 42.00 18.30 125039 SMO 2000 01 04 02 50 00 6051-66 D co CCGG 64.670 -999.990 ... R5 2000 01 24 13 43 00 -14.2500 -170.5700 47.00 42.00 5.00 125040 SMO 2000 01 04 02 50 00 6052-66 D co CCGG 63.350 -999.990 ... R5 2000 01 24 13 56 00 -14.2500 -170.5700 47.00 42.00 5.00 125041 SMO 2000 01 04 03 25 00 2093-66 S co CCGG 64.150 -999.990 S.. R5 2000 01 25 15 54 00 -14.2500 -170.5700 60.30 42.00 18.30 125042 SMO 2000 01 04 03 25 00 2094-66 S co CCGG 64.950 -999.990 S.. R5 2000 01 25 16 08 00 -14.2500 -170.5700 60.30 42.00 18.30 125043 SMO 2000 01 12 01 25 00 6761-66 D co CCGG 57.280 -999.990 ... R5 2000 01 24 14 10 00 -14.2500 -170.5700 47.00 42.00 5.00 125044 SMO 2000 01 12 01 25 00 6762-66 D co CCGG 57.400 -999.990 ... R5 2000 01 24 14 24 00 -14.2500 -170.5700 47.00 42.00 5.00 125045 SMO 2000 01 12 02 15 00 2163-66 S co CCGG 60.200 -999.990 S.. R5 2000 01 25 14 33 00 -14.2500 -170.5700 60.30 42.00 18.30 125046 SMO 2000 01 12 02 15 00 2164-66 S co CCGG 59.780 -999.990 S.. R5 2000 01 25 14 46 00 -14.2500 -170.5700 60.30 42.00 18.30 125047 SMO 2000 01 19 01 50 00 6155-66 D co CCGG 59.100 -999.990 ... R5 2000 02 04 10 39 00 -14.2500 -170.5700 47.00 42.00 5.00 125048 SMO 2000 01 19 01 50 00 6156-66 D co CCGG 59.430 -999.990 ... R5 2000 02 04 10 52 00 -14.2500 -170.5700 47.00 42.00 5.00 125049 SMO 2000 01 19 04 10 00 2015-66 S co CCGG 60.130 -999.990 S.. R5 2000 02 04 15 22 00 -14.2500 -170.5700 60.30 42.00 18.30 125050 SMO 2000 01 19 04 10 00 2016-66 S co CCGG 60.830 -999.990 S.. R5 2000 02 04 15 35 00 -14.2500 -170.5700 60.30 42.00 18.30 125051 SMO 2000 01 26 00 20 00 6797-66 D co CCGG 57.040 -999.990 ... R5 2000 02 04 10 11 00 -14.2500 -170.5700 47.00 42.00 5.00 125052 SMO 2000 01 26 00 20 00 6798-66 D co CCGG 56.720 -999.990 ... R5 2000 02 04 10 25 00 -14.2500 -170.5700 47.00 42.00 5.00 125053 SMO 2000 01 26 01 23 00 2031-66 S co CCGG 63.150 -999.990 S.. R5 2000 02 04 15 49 00 -14.2500 -170.5700 60.30 42.00 18.30 125054 SMO 2000 01 26 01 23 00 2032-66 S co CCGG 63.350 -999.990 S.. R5 2000 02 04 16 03 00 -14.2500 -170.5700 60.30 42.00 18.30 125055 SMO 2000 02 08 01 18 00 6855-66 D co CCGG 57.340 -999.990 ... R5 2000 02 25 11 46 00 -14.2500 -170.5700 47.00 42.00 5.00 125056 SMO 2000 02 08 01 18 00 6856-66 D co CCGG 57.410 -999.990 ... R5 2000 02 25 12 00 00 -14.2500 -170.5700 47.00 42.00 5.00 125057 SMO 2000 02 08 02 19 00 2257-66 S co CCGG 64.950 -999.990 S.. R5 2000 02 29 12 42 00 -14.2500 -170.5700 60.30 42.00 18.30 125058 SMO 2000 02 08 02 19 00 2258-66 S co CCGG 59.390 -999.990 S.. R5 2000 02 29 12 56 00 -14.2500 -170.5700 60.30 42.00 18.30 125059 SMO 2000 02 15 01 20 00 6215-66 D co CCGG 54.030 -999.990 ... R5 2000 02 25 11 19 00 -14.2500 -170.5700 47.00 42.00 5.00 125060 SMO 2000 02 15 01 20 00 6216-66 D co CCGG 54.210 -999.990 ... R5 2000 02 25 11 32 00 -14.2500 -170.5700 47.00 42.00 5.00 125061 SMO 2000 02 15 02 18 00 2267-66 S co CCGG 54.900 -999.990 S.. R5 2000 02 29 13 10 00 -14.2500 -170.5700 60.30 42.00 18.30 125062 SMO 2000 02 15 02 18 00 2268-66 S co CCGG 55.920 -999.990 S.. R5 2000 02 29 13 23 00 -14.2500 -170.5700 60.30 42.00 18.30 125063 SMO 2000 02 24 00 20 00 2019-66 S co CCGG 66.740 -999.990 S.. R5 2000 03 10 15 55 00 -14.2500 -170.5700 60.30 42.00 18.30 125064 SMO 2000 02 24 00 20 00 2020-66 S co CCGG 66.560 -999.990 S.. R5 2000 03 10 16 09 00 -14.2500 -170.5700 60.30 42.00 18.30 125065 SMO 2000 02 24 01 45 00 6527-66 D co CCGG 66.770 -999.990 ... R5 2000 03 10 10 52 00 -14.2500 -170.5700 47.00 42.00 5.00 125066 SMO 2000 02 24 01 45 00 6528-66 D co CCGG 65.670 -999.990 ... R5 2000 03 10 11 05 00 -14.2500 -170.5700 47.00 42.00 5.00 125067 SMO 2000 02 29 01 28 00 6039-66 D co CCGG 73.170 -999.990 ... R5 2000 03 10 12 14 00 -14.2500 -170.5700 47.00 42.00 5.00 125068 SMO 2000 02 29 01 28 00 6040-66 D co CCGG 72.310 -999.990 ... R5 2000 03 10 12 27 00 -14.2500 -170.5700 47.00 42.00 5.00 125069 SMO 2000 02 29 03 15 00 2333-66 S co CCGG 73.760 -999.990 S.. R5 2000 03 10 14 33 00 -14.2500 -170.5700 60.30 42.00 18.30 125070 SMO 2000 02 29 03 15 00 2334-66 S co CCGG 73.350 -999.990 S.. R5 2000 03 10 14 47 00 -14.2500 -170.5700 60.30 42.00 18.30 125071 SMO 2000 03 08 00 52 00 6701-66 D co CCGG 72.330 -999.990 ... R5 2000 03 28 15 59 00 -14.2500 -170.5700 47.00 42.00 5.00 125072 SMO 2000 03 08 00 52 00 6702-66 D co CCGG 72.190 -999.990 ... R5 2000 03 28 16 12 00 -14.2500 -170.5700 47.00 42.00 5.00 125073 SMO 2000 03 09 02 15 00 2167-66 S co CCGG 88.950 -999.990 S.. R5 2000 03 24 15 17 00 -14.2500 -170.5700 60.30 42.00 18.30 125074 SMO 2000 03 09 02 15 00 2168-66 S co CCGG 87.340 -999.990 S.. R5 2000 03 24 15 30 00 -14.2500 -170.5700 60.30 42.00 18.30 125075 SMO 2000 03 15 03 32 00 6341-66 D co CCGG 58.400 -999.990 ... R5 2000 03 28 14 39 00 -14.2500 -170.5700 47.00 42.00 5.00 125076 SMO 2000 03 15 03 32 00 6342-66 D co CCGG 59.110 -999.990 ... R5 2000 03 28 14 52 00 -14.2500 -170.5700 47.00 42.00 5.00 125077 SMO 2000 03 15 04 18 00 2087-66 S co CCGG 58.650 -999.990 S.. R5 2000 03 24 15 43 00 -14.2500 -170.5700 60.30 42.00 18.30 125078 SMO 2000 03 15 04 18 00 2088-66 S co CCGG 59.320 -999.990 S.. R5 2000 03 24 15 56 00 -14.2500 -170.5700 60.30 42.00 18.30 125079 SMO 2000 03 22 01 45 00 6453-66 D co CCGG 55.240 -999.990 ... R5 2000 04 07 13 39 00 -14.2500 -170.5700 47.00 42.00 5.00 125080 SMO 2000 03 22 01 45 00 6454-66 D co CCGG 56.060 -999.990 ... R5 2000 04 07 13 52 00 -14.2500 -170.5700 47.00 42.00 5.00 125081 SMO 2000 03 22 02 12 00 2183-66 S co CCGG 59.970 -999.990 S.. R5 2000 05 01 10 23 00 -14.2500 -170.5700 60.30 42.00 18.30 125082 SMO 2000 03 22 02 12 00 2184-66 S co CCGG 61.010 -999.990 S.. R5 2000 05 01 10 36 00 -14.2500 -170.5700 60.30 42.00 18.30 125083 SMO 2000 03 30 01 55 00 6279-66 D co CCGG 59.100 -999.990 ... R5 2000 04 07 13 13 00 -14.2500 -170.5700 47.00 42.00 5.00 125084 SMO 2000 03 30 01 55 00 6280-66 D co CCGG 58.840 -999.990 ... R5 2000 04 07 13 26 00 -14.2500 -170.5700 47.00 42.00 5.00 125085 SMO 2000 03 31 01 15 00 2275-66 S co CCGG 62.630 -999.990 S.. R5 2000 05 01 09 31 00 -14.2500 -170.5700 60.30 42.00 18.30 125086 SMO 2000 03 31 01 15 00 2276-66 S co CCGG 62.530 -999.990 S.. R5 2000 05 01 09 44 00 -14.2500 -170.5700 60.30 42.00 18.30 125087 SMO 2000 04 05 00 15 00 2307-66 S co CCGG 59.460 -999.990 S.. R5 2000 04 19 13 29 00 -14.2500 -170.5700 60.30 42.00 18.30 125088 SMO 2000 04 05 00 15 00 2308-66 S co CCGG 58.930 -999.990 S.. R5 2000 04 19 13 42 00 -14.2500 -170.5700 60.30 42.00 18.30 125089 SMO 2000 04 05 00 45 00 6029-66 D co CCGG 56.610 -999.990 ... R5 2000 05 09 15 32 00 -14.2500 -170.5700 47.00 42.00 5.00 125090 SMO 2000 04 05 00 45 00 6030-66 D co CCGG 54.910 -999.990 ... R5 2000 05 09 15 45 00 -14.2500 -170.5700 47.00 42.00 5.00 125091 SMO 2000 04 11 00 19 00 2345-66 S co CCGG 61.310 -999.990 S.. R5 2000 04 19 13 03 00 -14.2500 -170.5700 60.30 42.00 18.30 125092 SMO 2000 04 11 00 19 00 2346-66 S co CCGG 63.510 -999.990 S.. R5 2000 04 19 13 16 00 -14.2500 -170.5700 60.30 42.00 18.30 125093 SMO 2000 04 11 01 38 00 6521-66 D co CCGG 60.500 -999.990 ... R5 2000 05 09 15 06 00 -14.2500 -170.5700 47.00 42.00 5.00 125094 SMO 2000 04 11 01 38 00 6522-66 D co CCGG 59.680 -999.990 ... R5 2000 05 09 15 19 00 -14.2500 -170.5700 47.00 42.00 5.00 125095 SMO 2000 04 18 23 18 00 6481-66 D co CCGG 64.140 -999.990 ... R5 2000 05 10 09 51 00 -14.2500 -170.5700 47.00 42.00 5.00 125096 SMO 2000 04 18 23 18 00 6482-66 D co CCGG 64.790 -999.990 ... R5 2000 05 10 10 04 00 -14.2500 -170.5700 47.00 42.00 5.00 125097 SMO 2000 04 19 02 18 00 2031-66 S co CCGG 66.150 -999.990 S.. R5 2000 05 12 13 56 00 -14.2500 -170.5700 60.30 42.00 18.30 125098 SMO 2000 04 19 02 18 00 2032-66 S co CCGG 66.000 -999.990 S.. R5 2000 05 12 14 09 00 -14.2500 -170.5700 60.30 42.00 18.30 125099 SMO 2000 04 25 02 19 00 6147-66 D co CCGG 52.390 -999.990 ... R5 2000 05 10 09 25 00 -14.2500 -170.5700 47.00 42.00 5.00 125100 SMO 2000 04 25 02 19 00 6148-66 D co CCGG 52.380 -999.990 ... R5 2000 05 10 09 38 00 -14.2500 -170.5700 47.00 42.00 5.00 125101 SMO 2000 04 25 03 19 00 2015-66 S co CCGG 53.930 -999.990 S.. R5 2000 05 12 14 48 00 -14.2500 -170.5700 60.30 42.00 18.30 125102 SMO 2000 04 25 03 19 00 2016-66 S co CCGG 54.770 -999.990 S.. R5 2000 05 12 15 01 00 -14.2500 -170.5700 60.30 42.00 18.30 125103 SMO 2000 05 05 02 00 00 6091-66 D co CCGG 51.750 -999.990 ..> R5 2000 05 16 12 39 00 -14.2500 -170.5700 47.00 42.00 5.00 125104 SMO 2000 05 05 02 00 00 6092-66 D co CCGG 50.960 -999.990 ... R5 2000 05 16 12 52 00 -14.2500 -170.5700 47.00 42.00 5.00 125105 SMO 2000 05 05 04 45 00 2051-66 S co CCGG 52.620 -999.990 S.. R5 2000 05 19 14 48 00 -14.2500 -170.5700 60.30 42.00 18.30 125106 SMO 2000 05 05 04 45 00 2052-66 S co CCGG 45.320 -999.990 S.. R5 2000 05 19 15 01 00 -14.2500 -170.5700 60.30 42.00 18.30 125107 SMO 2000 05 11 02 00 00 6331-66 D co CCGG 63.680 -999.990 ... R5 2000 05 16 12 11 00 -14.2500 -170.5700 47.00 42.00 5.00 125108 SMO 2000 05 11 02 00 00 6332-66 D co CCGG 62.560 -999.990 ..< R5 2000 05 16 12 24 00 -14.2500 -170.5700 47.00 42.00 5.00 125109 SMO 2000 05 11 04 45 00 2107-66 S co CCGG 65.700 -999.990 S.. R5 2000 05 19 15 14 00 -14.2500 -170.5700 60.30 42.00 18.30 125110 SMO 2000 05 11 04 45 00 2108-66 S co CCGG 66.340 -999.990 S.. R5 2000 05 19 15 27 00 -14.2500 -170.5700 60.30 42.00 18.30 125111 SMO 2000 05 17 00 15 00 2041-66 S co CCGG 56.670 -999.990 S.. R5 2000 06 26 12 46 00 -14.2500 -170.5700 60.30 42.00 18.30 125112 SMO 2000 05 17 00 15 00 2042-66 S co CCGG 56.410 -999.990 S.. R5 2000 06 26 12 59 00 -14.2500 -170.5700 60.30 42.00 18.30 125113 SMO 2000 05 17 00 57 00 6255-66 D co CCGG 51.990 -999.990 ... R5 2000 06 07 11 23 00 -14.2500 -170.5700 47.00 42.00 5.00 125114 SMO 2000 05 17 00 57 00 6256-66 D co CCGG 51.490 -999.990 ... R5 2000 06 07 11 37 00 -14.2500 -170.5700 47.00 42.00 5.00 125115 SMO 2000 05 23 01 00 00 6469-66 D co CCGG 52.700 -999.990 ... R5 2000 06 07 11 50 00 -14.2500 -170.5700 47.00 42.00 5.00 125116 SMO 2000 05 23 01 00 00 6470-66 D co CCGG 52.170 -999.990 ... R5 2000 06 07 12 03 00 -14.2500 -170.5700 47.00 42.00 5.00 125117 SMO 2000 05 23 02 13 00 2133-66 S co CCGG 54.950 -999.990 S.. R5 2000 06 26 12 19 00 -14.2500 -170.5700 60.30 42.00 18.30 125118 SMO 2000 05 23 02 13 00 2134-66 S co CCGG 54.540 -999.990 S.. R5 2000 06 26 12 32 00 -14.2500 -170.5700 60.30 42.00 18.30 125119 SMO 2000 06 06 01 09 00 2093-66 S co CCGG 54.680 -999.990 S.. R5 2000 07 05 14 41 00 -14.2500 -170.5700 60.30 42.00 18.30 125120 SMO 2000 06 06 01 09 00 2094-66 S co CCGG 55.800 -999.990 S.. R5 2000 07 05 14 54 00 -14.2500 -170.5700 60.30 42.00 18.30 125121 SMO 2000 06 06 01 43 00 6389-66 D co CCGG 54.010 -999.990 ... R5 2000 06 30 11 30 00 -14.2500 -170.5700 47.00 42.00 5.00 125122 SMO 2000 06 06 01 43 00 6390-66 D co CCGG 53.310 -999.990 ... R5 2000 06 30 11 43 00 -14.2500 -170.5700 47.00 42.00 5.00 125123 SMO 2000 06 13 00 10 00 2163-66 S co CCGG 59.100 -999.990 S.. R5 2000 07 05 15 07 00 -14.2500 -170.5700 60.30 42.00 18.30 125124 SMO 2000 06 13 00 10 00 2164-66 S co CCGG 57.790 -999.990 S.. R5 2000 07 05 15 20 00 -14.2500 -170.5700 60.30 42.00 18.30 125125 SMO 2000 06 13 02 32 00 6291-66 D co CCGG 54.360 -999.990 ... R5 2000 06 30 11 04 00 -14.2500 -170.5700 47.00 42.00 5.00 125126 SMO 2000 06 13 02 32 00 6292-66 D co CCGG 54.090 -999.990 ... R5 2000 06 30 11 17 00 -14.2500 -170.5700 47.00 42.00 5.00 125127 SMO 2000 06 21 02 10 00 2015-66 S co CCGG 49.770 -999.990 S.< R5 2000 07 24 13 38 00 -14.2500 -170.5700 60.30 42.00 18.30 125128 SMO 2000 06 21 02 10 00 2016-66 S co CCGG 55.930 -999.990 S.> R5 2000 07 24 13 51 00 -14.2500 -170.5700 60.30 42.00 18.30 125129 SMO 2000 06 22 01 00 00 6035-66 D co CCGG 56.570 -999.990 ... R5 2000 07 07 13 13 00 -14.2500 -170.5700 47.00 42.00 5.00 125130 SMO 2000 06 22 01 00 00 6036-66 D co CCGG 55.200 -999.990 ... R5 2000 07 07 13 26 00 -14.2500 -170.5700 47.00 42.00 5.00 125131 SMO 2000 06 27 00 10 00 2333-66 S co CCGG 58.420 -999.990 S.. R5 2000 07 24 14 04 00 -14.2500 -170.5700 60.30 42.00 18.30 125132 SMO 2000 06 27 00 10 00 2334-66 S co CCGG 59.010 -999.990 S.. R5 2000 07 24 14 17 00 -14.2500 -170.5700 60.30 42.00 18.30 125133 SMO 2000 06 27 01 43 00 6427-66 D co CCGG 55.810 -999.990 ... R5 2000 07 07 13 39 00 -14.2500 -170.5700 47.00 42.00 5.00 125134 SMO 2000 06 27 01 43 00 6428-66 D co CCGG 55.760 -999.990 ... R5 2000 07 07 13 52 00 -14.2500 -170.5700 47.00 42.00 5.00 125135 SMO 2000 07 04 02 30 00 1733-91 D co CCGG 60.240 -999.990 ... R5 2000 07 18 10 34 00 -14.2500 -170.5700 47.00 42.00 5.00 125136 SMO 2000 07 04 02 30 00 1734-91 D co CCGG 59.960 -999.990 ... R5 2000 07 18 10 47 00 -14.2500 -170.5700 47.00 42.00 5.00 125137 SMO 2000 07 04 05 23 00 2019-66 S co CCGG 62.250 -999.990 S.. R5 2000 07 19 13 14 00 -14.2500 -170.5700 60.30 42.00 18.30 125138 SMO 2000 07 04 05 23 00 2020-66 S co CCGG 62.580 -999.990 S.. R5 2000 07 19 13 27 00 -14.2500 -170.5700 60.30 42.00 18.30 125139 SMO 2000 07 12 00 09 00 2031-66 S co CCGG 61.400 -999.990 S.. R5 2000 07 19 14 06 00 -14.2500 -170.5700 60.30 42.00 18.30 125140 SMO 2000 07 12 00 39 00 1761-91 D co CCGG 60.180 -999.990 ... R5 2000 07 18 11 00 00 -14.2500 -170.5700 47.00 42.00 5.00 125141 SMO 2000 07 12 00 39 00 1762-91 D co CCGG 59.030 -999.990 ... R5 2000 07 18 11 13 00 -14.2500 -170.5700 47.00 42.00 5.00 125142 SMO 2000 07 18 01 09 00 2087-66 S co CCGG 61.290 -999.990 S.. R5 2000 08 11 10 13 00 -14.2500 -170.5700 60.30 42.00 18.30 125143 SMO 2000 07 18 01 09 00 2088-66 S co CCGG 60.410 -999.990 S.. R5 2000 08 11 10 26 00 -14.2500 -170.5700 60.30 42.00 18.30 125144 SMO 2000 07 18 01 35 00 6047-66 D co CCGG 58.610 -999.990 ... R5 2000 08 10 15 09 00 -14.2500 -170.5700 47.00 42.00 5.00 125145 SMO 2000 07 18 01 35 00 6048-66 D co CCGG 58.730 -999.990 ... R5 2000 08 10 15 22 00 -14.2500 -170.5700 47.00 42.00 5.00 125146 SMO 2000 07 25 00 11 00 2089-66 S co CCGG 61.200 -999.990 S.. R5 2000 08 11 11 33 00 -14.2500 -170.5700 60.30 42.00 18.30 125147 SMO 2000 07 25 00 11 00 2090-66 S co CCGG 60.290 -999.990 S.. R5 2000 08 11 11 46 00 -14.2500 -170.5700 60.30 42.00 18.30 125148 SMO 2000 07 25 01 40 00 6249-66 D co CCGG 58.960 -999.990 ... R5 2000 08 10 14 43 00 -14.2500 -170.5700 47.00 42.00 5.00 125149 SMO 2000 07 25 01 40 00 6250-66 D co CCGG 58.270 -999.990 ... R5 2000 08 10 14 56 00 -14.2500 -170.5700 47.00 42.00 5.00 125150 SMO 2000 08 02 02 10 00 2133-66 S co CCGG 62.170 -999.990 S.. R5 2000 08 23 15 39 00 -14.2500 -170.5700 60.30 42.00 18.30 125151 SMO 2000 08 02 02 10 00 2134-66 S co CCGG 62.770 -999.990 S.. R5 2000 08 23 15 52 00 -14.2500 -170.5700 60.30 42.00 18.30 125152 SMO 2000 08 02 02 40 00 6329-66 D co CCGG 60.400 -999.990 ... R5 2000 09 05 09 31 00 -14.2500 -170.5700 47.00 42.00 5.00 125153 SMO 2000 08 02 02 40 00 6330-66 D co CCGG 59.090 -999.990 ... R5 2000 09 05 09 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125154 SMO 2000 08 09 00 10 00 2163-66 S co CCGG 61.360 -999.990 S.. R5 2000 08 23 15 13 00 -14.2500 -170.5700 60.30 42.00 18.30 125155 SMO 2000 08 09 00 10 00 2164-66 S co CCGG 60.530 -999.990 S.. R5 2000 08 23 15 26 00 -14.2500 -170.5700 60.30 42.00 18.30 125156 SMO 2000 08 09 03 12 00 6395-66 D co CCGG 58.460 -999.990 ... R5 2000 09 05 09 03 00 -14.2500 -170.5700 47.00 42.00 5.00 125157 SMO 2000 08 09 03 12 00 6396-66 D co CCGG 58.220 -999.990 ... R5 2000 09 05 09 16 00 -14.2500 -170.5700 47.00 42.00 5.00 125158 SMO 2000 08 16 00 09 00 2041-66 S co CCGG 62.280 -999.990 S.. R5 2000 09 05 09 57 00 -14.2500 -170.5700 60.30 42.00 18.30 125159 SMO 2000 08 16 00 09 00 2042-66 S co CCGG 61.890 -999.990 S.. R5 2000 09 05 10 10 00 -14.2500 -170.5700 60.30 42.00 18.30 125160 SMO 2000 08 16 01 02 00 6037-66 D co CCGG 57.690 -999.990 ... R5 2000 09 01 11 55 00 -14.2500 -170.5700 47.00 42.00 5.00 125161 SMO 2000 08 16 01 02 00 6038-66 D co CCGG 58.090 -999.990 ... R5 2000 09 01 12 08 00 -14.2500 -170.5700 47.00 42.00 5.00 125162 SMO 2000 08 22 00 10 00 2131-66 S co CCGG 61.890 -999.990 S.. R5 2000 09 05 10 25 00 -14.2500 -170.5700 60.30 42.00 18.30 125163 SMO 2000 08 22 00 10 00 2132-66 S co CCGG 67.160 -999.990 S.. R5 2000 09 05 10 38 00 -14.2500 -170.5700 60.30 42.00 18.30 125164 SMO 2000 08 22 01 45 00 6001-66 D co CCGG 59.290 -999.990 ... R5 2000 09 05 13 29 00 -14.2500 -170.5700 47.00 42.00 5.00 125165 SMO 2000 08 22 01 45 00 6002-66 D co CCGG 59.570 -999.990 ... R5 2000 09 05 13 42 00 -14.2500 -170.5700 47.00 42.00 5.00 125166 SMO 2000 09 05 21 44 00 1457-91 D co CCGG 58.850 -999.990 ... R5 2000 10 04 09 23 00 -14.2500 -170.5700 47.00 42.00 5.00 125167 SMO 2000 09 05 21 44 00 1458-91 D co CCGG 60.440 -999.990 ... R5 2000 10 04 09 36 00 -14.2500 -170.5700 47.00 42.00 5.00 125168 SMO 2000 09 12 00 10 00 2133-66 S co CCGG 62.460 -999.990 S.. R5 2000 10 04 12 02 00 -14.2500 -170.5700 60.30 42.00 18.30 125169 SMO 2000 09 12 00 10 00 2134-66 S co CCGG 63.140 -999.990 S.. R5 2000 10 04 12 15 00 -14.2500 -170.5700 60.30 42.00 18.30 125170 SMO 2000 09 12 01 08 00 1371-91 D co CCGG 60.010 -999.990 ... R5 2000 10 04 09 49 00 -14.2500 -170.5700 47.00 42.00 5.00 125171 SMO 2000 09 12 01 08 00 1372-91 D co CCGG 60.280 -999.990 ... R5 2000 10 04 10 02 00 -14.2500 -170.5700 47.00 42.00 5.00 125172 SMO 2000 09 19 00 10 00 2067-66 S co CCGG 69.570 -999.990 S.. R5 2000 10 04 12 37 00 -14.2500 -170.5700 60.30 42.00 18.30 125173 SMO 2000 09 19 00 10 00 2068-66 S co CCGG 70.420 -999.990 S.. R5 2000 10 04 12 50 00 -14.2500 -170.5700 60.30 42.00 18.30 125174 SMO 2000 09 19 01 43 00 1661-91 D co CCGG 65.260 -999.990 ... R5 2000 10 05 08 37 00 -14.2500 -170.5700 47.00 42.00 5.00 125175 SMO 2000 09 19 01 43 00 1662-91 D co CCGG 64.530 -999.990 ... R5 2000 10 05 08 50 00 -14.2500 -170.5700 47.00 42.00 5.00 125176 SMO 2000 09 27 00 13 00 2089-66 S co CCGG 66.520 -999.990 S.. R5 2000 10 12 14 02 00 -14.2500 -170.5700 60.30 42.00 18.30 125177 SMO 2000 09 27 00 13 00 2090-66 S co CCGG 67.330 -999.990 S.. R5 2000 10 12 14 15 00 -14.2500 -170.5700 60.30 42.00 18.30 125178 SMO 2000 09 27 01 02 00 4633-91 D co CCGG 63.160 -999.990 ... R5 2000 10 06 09 54 00 -14.2500 -170.5700 47.00 42.00 5.00 125179 SMO 2000 09 27 01 02 00 4634-91 D co CCGG 61.720 -999.990 ... R5 2000 10 06 10 07 00 -14.2500 -170.5700 47.00 42.00 5.00 125180 SMO 2000 10 03 21 11 00 2087-66 S co CCGG 68.380 -999.990 S.. R5 2000 10 12 13 36 00 -14.2500 -170.5700 60.30 42.00 18.30 125181 SMO 2000 10 03 21 11 00 2088-66 S co CCGG 68.440 -999.990 S.. R5 2000 10 12 13 49 00 -14.2500 -170.5700 60.30 42.00 18.30 125182 SMO 2000 10 03 22 50 00 4545-91 D co CCGG 67.810 -999.990 ... R5 2000 10 23 12 27 00 -14.2500 -170.5700 47.00 42.00 5.00 125183 SMO 2000 10 03 22 50 00 4546-91 D co CCGG 67.690 -999.990 ... R5 2000 10 23 12 40 00 -14.2500 -170.5700 47.00 42.00 5.00 125184 SMO 2000 10 14 02 40 00 2167-66 S co CCGG 66.330 -999.990 S.. R5 2000 10 25 14 16 00 -14.2500 -170.5700 60.30 42.00 18.30 125185 SMO 2000 10 14 02 40 00 2168-66 S co CCGG 65.050 -999.990 S.. R5 2000 10 25 14 29 00 -14.2500 -170.5700 60.30 42.00 18.30 125186 SMO 2000 10 14 03 05 00 483-91 D co CCGG 64.360 -999.990 ... R5 2000 10 23 12 53 00 -14.2500 -170.5700 47.00 42.00 5.00 125187 SMO 2000 10 14 03 05 00 484-91 D co CCGG 63.190 -999.990 ... R5 2000 10 23 13 06 00 -14.2500 -170.5700 47.00 42.00 5.00 125188 SMO 2000 10 18 22 45 00 1603-91 D co CCGG 85.200 -999.990 .X. R5 2000 11 03 13 46 00 -14.2500 -170.5700 47.00 42.00 5.00 125189 SMO 2000 10 18 22 45 00 1604-91 D co CCGG 85.530 -999.990 .X. R5 2000 11 03 13 59 00 -14.2500 -170.5700 47.00 42.00 5.00 125190 SMO 2000 10 23 23 58 00 1761-91 D co CCGG 67.170 -999.990 ... R5 2000 11 03 13 20 00 -14.2500 -170.5700 47.00 42.00 5.00 125191 SMO 2000 10 23 23 58 00 1762-91 D co CCGG 66.590 -999.990 ... R5 2000 11 03 13 33 00 -14.2500 -170.5700 47.00 42.00 5.00 125192 SMO 2000 11 01 00 47 00 4837-91 D co CCGG 66.530 -999.990 ... R5 2000 11 16 10 08 00 -14.2500 -170.5700 47.00 42.00 5.00 125193 SMO 2000 11 01 00 47 00 4838-91 D co CCGG 65.720 -999.990 ... R5 2000 11 16 10 21 00 -14.2500 -170.5700 47.00 42.00 5.00 125194 SMO 2000 11 07 02 10 00 4587-91 D co CCGG 61.820 -999.990 ... R5 2000 11 16 10 36 00 -14.2500 -170.5700 47.00 42.00 5.00 125195 SMO 2000 11 07 02 10 00 4588-91 D co CCGG 61.880 -999.990 ... R5 2000 11 16 10 49 00 -14.2500 -170.5700 47.00 42.00 5.00 125196 SMO 2000 11 08 01 09 00 2167-66 S co CCGG 66.370 -999.990 S.. R5 2000 11 29 13 33 00 -14.2500 -170.5700 60.30 42.00 18.30 125197 SMO 2000 11 08 01 09 00 2168-66 S co CCGG 65.950 -999.990 S.. R5 2000 11 29 13 46 00 -14.2500 -170.5700 60.30 42.00 18.30 125198 SMO 2000 11 13 22 09 00 2089-66 S co CCGG 71.870 -999.990 S.. R5 2000 11 29 13 06 00 -14.2500 -170.5700 60.30 42.00 18.30 125199 SMO 2000 11 13 22 09 00 2090-66 S co CCGG 71.740 -999.990 S.. R5 2000 11 29 13 19 00 -14.2500 -170.5700 60.30 42.00 18.30 125200 SMO 2000 11 13 22 30 00 10-99 D co CCGG 69.260 -999.990 ... R5 2000 12 06 11 53 00 -14.2500 -170.5700 47.00 42.00 5.00 125202 SMO 2000 11 13 22 30 00 9-99 D co CCGG 70.150 -999.990 ... R5 2000 12 06 11 40 00 -14.2500 -170.5700 47.00 42.00 5.00 125201 SMO 2000 11 22 00 08 00 2131-66 S co CCGG 61.270 -999.990 S.. R5 2000 12 20 15 19 00 -14.2500 -170.5700 60.30 42.00 18.30 125203 SMO 2000 11 22 00 08 00 2132-66 S co CCGG 68.080 -999.990 S.. R5 2000 12 20 15 32 00 -14.2500 -170.5700 60.30 42.00 18.30 125204 SMO 2000 11 22 00 48 00 225-99 D co CCGG 59.380 -999.990 ... R5 2000 12 06 12 06 00 -14.2500 -170.5700 47.00 42.00 5.00 125205 SMO 2000 11 22 00 48 00 226-99 D co CCGG 59.680 -999.990 ... R5 2000 12 06 12 19 00 -14.2500 -170.5700 47.00 42.00 5.00 125206 SMO 2000 11 29 00 08 00 2041-66 S co CCGG 63.390 -999.990 S.. R5 2000 12 26 10 38 00 -14.2500 -170.5700 60.30 42.00 18.30 125207 SMO 2000 11 29 00 08 00 2042-66 S co CCGG 63.310 -999.990 S.. R5 2000 12 26 10 51 00 -14.2500 -170.5700 60.30 42.00 18.30 125208 SMO 2000 11 29 00 54 00 4191-91 D co CCGG 59.200 -999.990 ... R5 2000 12 15 11 34 00 -14.2500 -170.5700 47.00 42.00 5.00 125209 SMO 2000 11 29 00 54 00 4192-91 D co CCGG 58.660 -999.990 ... R5 2000 12 15 11 47 00 -14.2500 -170.5700 47.00 42.00 5.00 125210 SMO 2000 12 04 21 00 00 2133-66 S co CCGG 67.900 -999.990 S.. R5 2001 01 10 13 37 00 -14.2500 -170.5700 60.30 42.00 18.30 125211 SMO 2000 12 04 21 00 00 2134-66 S co CCGG 67.020 -999.990 S.. R5 2001 01 10 13 50 00 -14.2500 -170.5700 60.30 42.00 18.30 125212 SMO 2000 12 04 22 15 00 1041-91 D co CCGG 66.230 -999.990 ... R5 2000 12 15 11 08 00 -14.2500 -170.5700 47.00 42.00 5.00 125213 SMO 2000 12 04 22 15 00 1042-91 D co CCGG 65.700 -999.990 ... R5 2000 12 15 11 21 00 -14.2500 -170.5700 47.00 42.00 5.00 125214 SMO 2000 12 27 00 09 00 2163-66 S co CCGG 77.740 -999.990 S.. R5 2001 01 18 14 45 00 -14.2500 -170.5700 60.30 42.00 18.30 125215 SMO 2000 12 27 00 09 00 2164-66 S co CCGG 55.540 -999.990 S.. R5 2001 01 18 14 58 00 -14.2500 -170.5700 60.30 42.00 18.30 125216 SMO 2001 01 03 00 11 00 2089-66 S co CCGG 57.520 -999.990 S.. R5 2001 01 18 14 19 00 -14.2500 -170.5700 60.30 42.00 18.30 125217 SMO 2001 01 03 00 11 00 2090-66 S co CCGG 56.350 -999.990 S.. R5 2001 01 18 14 32 00 -14.2500 -170.5700 60.30 42.00 18.30 125218 SMO 2001 01 09 01 10 00 2087-66 S co CCGG 65.860 -999.990 S.. R5 2001 02 02 16 04 00 -14.2500 -170.5700 60.30 42.00 18.30 125219 SMO 2001 01 09 01 10 00 2088-66 S co CCGG 66.190 -999.990 S.. R5 2001 02 02 16 17 00 -14.2500 -170.5700 60.30 42.00 18.30 125220 SMO 2001 01 17 00 09 00 2019-66 S co CCGG 57.370 -999.990 S.. R5 2001 02 02 14 18 00 -14.2500 -170.5700 60.30 42.00 18.30 125221 SMO 2001 01 17 00 09 00 2020-66 S co CCGG 56.940 -999.990 S.. R5 2001 02 02 14 31 00 -14.2500 -170.5700 60.30 42.00 18.30 125222 SMO 2001 01 17 00 45 00 4499-91 D co CCGG 52.740 -999.990 ... R5 2001 02 01 14 07 00 -14.2500 -170.5700 47.00 42.00 5.00 125223 SMO 2001 01 17 00 45 00 4500-91 D co CCGG 51.930 -999.990 ... R5 2001 02 01 14 20 00 -14.2500 -170.5700 47.00 42.00 5.00 125224 SMO 2001 01 23 01 09 00 2015-66 S co CCGG 63.330 -999.990 S.. R5 2001 02 08 11 40 00 -14.2500 -170.5700 60.30 42.00 18.30 125225 SMO 2001 01 23 01 09 00 2016-66 S co CCGG 64.090 -999.990 S.. R5 2001 02 08 11 53 00 -14.2500 -170.5700 60.30 42.00 18.30 125226 SMO 2001 01 23 01 53 00 4101-91 D co CCGG 61.050 -999.990 ... R5 2001 02 01 14 33 00 -14.2500 -170.5700 47.00 42.00 5.00 125227 SMO 2001 01 23 01 53 00 4102-91 D co CCGG 61.250 -999.990 ... R5 2001 02 01 14 46 00 -14.2500 -170.5700 47.00 42.00 5.00 125228 SMO 2001 01 30 00 00 00 2301-66 S co CCGG 62.030 -999.990 S.. R5 2001 02 08 12 06 00 -14.2500 -170.5700 60.30 42.00 18.30 125229 SMO 2001 01 30 00 00 00 2302-66 S co CCGG 62.300 -999.990 S.. R5 2001 02 08 12 19 00 -14.2500 -170.5700 60.30 42.00 18.30 125230 SMO 2001 01 30 02 22 00 1183-91 D co CCGG 57.580 -999.990 ... R5 2001 02 28 08 57 00 -14.2500 -170.5700 47.00 42.00 5.00 125231 SMO 2001 01 30 02 22 00 1184-91 D co CCGG 56.880 -999.990 ... R5 2001 02 28 09 10 00 -14.2500 -170.5700 47.00 42.00 5.00 125232 SMO 2001 02 07 01 11 00 2241-66 S co CCGG 68.980 -999.990 S.. R5 2001 03 07 09 22 00 -14.2500 -170.5700 60.30 42.00 18.30 125233 SMO 2001 02 07 01 11 00 2242-66 S co CCGG 69.360 -999.990 S.. R5 2001 03 07 09 35 00 -14.2500 -170.5700 60.30 42.00 18.30 125234 SMO 2001 02 07 02 05 00 4185-91 D co CCGG 63.010 -999.990 ... R5 2001 02 28 09 23 00 -14.2500 -170.5700 47.00 42.00 5.00 125235 SMO 2001 02 07 02 05 00 4186-91 D co CCGG 63.440 -999.990 ... R5 2001 02 28 09 36 00 -14.2500 -170.5700 47.00 42.00 5.00 125236 SMO 2001 02 12 22 11 00 2133-66 S co CCGG 67.900 -999.990 S.. R5 2001 03 07 08 56 00 -14.2500 -170.5700 60.30 42.00 18.30 125237 SMO 2001 02 12 22 11 00 2134-66 S co CCGG 67.480 -999.990 S.. R5 2001 03 07 09 09 00 -14.2500 -170.5700 60.30 42.00 18.30 125238 SMO 2001 02 12 22 44 00 217-99 D co CCGG 65.290 -999.990 ... R5 2001 03 08 11 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125239 SMO 2001 02 12 22 44 00 218-99 D co CCGG 64.900 -999.990 ... R5 2001 03 08 11 57 00 -14.2500 -170.5700 47.00 42.00 5.00 125240 SMO 2001 02 21 00 08 00 2131-66 S co CCGG 76.500 -999.990 S.. R5 2001 04 18 12 32 00 -14.2500 -170.5700 60.30 42.00 18.30 125241 SMO 2001 02 21 00 08 00 2132-66 S co CCGG 82.740 -999.990 S.. R5 2001 04 18 12 45 00 -14.2500 -170.5700 60.30 42.00 18.30 125242 SMO 2001 02 21 01 10 00 265-91 D co CCGG 73.570 -999.990 ... R5 2001 03 08 12 10 00 -14.2500 -170.5700 47.00 42.00 5.00 125243 SMO 2001 02 21 01 10 00 266-91 D co CCGG 73.360 -999.990 ... R5 2001 03 08 12 23 00 -14.2500 -170.5700 47.00 42.00 5.00 125244 SMO 2001 03 08 01 06 00 1039-91 D co CCGG 72.300 -999.990 ... R5 2001 04 03 16 15 00 -14.2500 -170.5700 47.00 42.00 5.00 125245 SMO 2001 03 08 01 06 00 1040-91 D co CCGG 71.030 -999.990 ... R5 2001 04 03 16 28 00 -14.2500 -170.5700 47.00 42.00 5.00 125246 SMO 2001 03 16 22 10 00 2041-66 S co CCGG 62.940 -999.990 S.. R5 2001 04 18 12 06 00 -14.2500 -170.5700 60.30 42.00 18.30 125247 SMO 2001 03 16 22 10 00 2042-66 S co CCGG 61.530 -999.990 S.. R5 2001 04 18 12 19 00 -14.2500 -170.5700 60.30 42.00 18.30 125248 SMO 2001 03 16 22 45 00 1161-91 D co CCGG 63.290 -999.990 ... R5 2001 04 03 15 49 00 -14.2500 -170.5700 47.00 42.00 5.00 125249 SMO 2001 03 16 22 45 00 1162-91 D co CCGG 62.510 -999.990 ... R5 2001 04 03 16 02 00 -14.2500 -170.5700 47.00 42.00 5.00 125250 SMO 2001 03 20 02 25 00 4009-91 D co CCGG 57.080 -999.990 ... R5 2001 04 10 13 13 00 -14.2500 -170.5700 47.00 42.00 5.00 125251 SMO 2001 03 20 02 25 00 4010-91 D co CCGG 57.030 -999.990 ... R5 2001 04 10 13 26 00 -14.2500 -170.5700 47.00 42.00 5.00 125252 SMO 2001 03 26 22 23 00 1513-91 D co CCGG 53.570 -999.990 ... R5 2001 04 10 12 37 00 -14.2500 -170.5700 47.00 42.00 5.00 125253 SMO 2001 03 26 22 23 00 1514-91 D co CCGG 55.110 -999.990 ... R5 2001 04 10 12 50 00 -14.2500 -170.5700 47.00 42.00 5.00 125254 SMO 2001 04 04 01 22 00 4077-91 D co CCGG 64.330 -999.990 ... R5 2001 04 17 08 59 00 -14.2500 -170.5700 47.00 42.00 5.00 125255 SMO 2001 04 04 01 22 00 4078-91 D co CCGG 63.470 -999.990 ... R5 2001 04 17 09 12 00 -14.2500 -170.5700 47.00 42.00 5.00 125256 SMO 2001 04 17 22 08 00 2163-66 S co CCGG 71.810 -999.990 S.. R5 2001 05 11 10 02 00 -14.2500 -170.5700 60.30 42.00 18.30 125257 SMO 2001 04 17 22 08 00 2164-66 S co CCGG 52.790 -999.990 S.. R5 2001 05 11 10 15 00 -14.2500 -170.5700 60.30 42.00 18.30 125258 SMO 2001 04 17 23 16 00 345-91 D co CCGG 51.970 -999.990 ... R5 2001 05 29 13 13 00 -14.2500 -170.5700 47.00 42.00 5.00 125259 SMO 2001 04 17 23 16 00 346-91 D co CCGG 51.910 -999.990 ... R5 2001 05 29 13 26 00 -14.2500 -170.5700 47.00 42.00 5.00 125260 SMO 2001 05 03 21 10 00 2067-66 S co CCGG 52.940 -999.990 S.. R5 2001 05 11 09 36 00 -14.2500 -170.5700 60.30 42.00 18.30 125261 SMO 2001 05 03 21 10 00 2068-66 S co CCGG 53.060 -999.990 S.. R5 2001 05 11 09 49 00 -14.2500 -170.5700 60.30 42.00 18.30 125262 SMO 2001 05 03 22 01 00 2005-91 D co CCGG 52.980 -999.990 ... R5 2001 05 22 15 59 00 -14.2500 -170.5700 47.00 42.00 5.00 125263 SMO 2001 05 03 22 01 00 2006-91 D co CCGG 51.500 -999.990 ... R5 2001 05 22 16 12 00 -14.2500 -170.5700 47.00 42.00 5.00 125264 SMO 2001 05 08 03 09 00 2213-66 S co CCGG 55.270 -999.990 S.. R5 2001 06 08 13 35 00 -14.2500 -170.5700 60.30 42.00 18.30 125265 SMO 2001 05 08 03 09 00 2214-66 S co CCGG 55.150 -999.990 S.. R5 2001 06 08 13 48 00 -14.2500 -170.5700 60.30 42.00 18.30 125266 SMO 2001 05 08 03 32 00 1083-91 D co CCGG 52.330 -999.990 ... R5 2001 05 22 16 25 00 -14.2500 -170.5700 47.00 42.00 5.00 125267 SMO 2001 05 08 03 32 00 1084-91 D co CCGG 52.210 -999.990 ... R5 2001 05 22 16 38 00 -14.2500 -170.5700 47.00 42.00 5.00 125268 SMO 2001 05 18 23 49 00 2133-66 S co CCGG 56.990 -999.990 S.. R5 2001 06 08 14 02 00 -14.2500 -170.5700 60.30 42.00 18.30 125269 SMO 2001 05 18 23 49 00 2134-66 S co CCGG 57.420 -999.990 S.. R5 2001 06 08 14 15 00 -14.2500 -170.5700 60.30 42.00 18.30 125270 SMO 2001 05 19 01 05 00 1715-91 D co CCGG 54.910 -999.990 ... R5 2001 05 29 13 39 00 -14.2500 -170.5700 47.00 42.00 5.00 125271 SMO 2001 05 19 01 05 00 1716-91 D co CCGG 55.390 -999.990 ... R5 2001 05 29 13 52 00 -14.2500 -170.5700 47.00 42.00 5.00 125272 SMO 2001 05 26 00 05 00 293-99 D co CCGG 58.340 -999.990 ... R5 2001 07 06 16 12 00 -14.2500 -170.5700 47.00 42.00 5.00 125273 SMO 2001 05 26 00 05 00 294-99 D co CCGG 57.900 -999.990 ... R5 2001 07 06 16 25 00 -14.2500 -170.5700 47.00 42.00 5.00 125274 SMO 2001 05 30 01 07 00 1275-91 D co CCGG 53.210 -999.990 ... R5 2001 06 20 11 41 00 -14.2500 -170.5700 47.00 42.00 5.00 125275 SMO 2001 05 30 01 07 00 1276-91 D co CCGG 53.570 -999.990 ... R5 2001 06 20 11 54 00 -14.2500 -170.5700 47.00 42.00 5.00 125276 SMO 2001 06 06 01 33 00 4785-91 D co CCGG 55.860 -999.990 ... R5 2001 06 20 11 15 00 -14.2500 -170.5700 47.00 42.00 5.00 125277 SMO 2001 06 06 01 33 00 4786-91 D co CCGG 55.560 -999.990 ... R5 2001 06 20 11 28 00 -14.2500 -170.5700 47.00 42.00 5.00 125278 SMO 2001 06 13 01 22 00 327-99 D co CCGG 54.600 -999.990 ... R5 2001 06 27 13 42 00 -14.2500 -170.5700 47.00 42.00 5.00 125279 SMO 2001 06 13 01 22 00 328-99 D co CCGG 53.680 -999.990 ... R5 2001 06 27 13 55 00 -14.2500 -170.5700 47.00 42.00 5.00 125280 SMO 2001 06 19 22 12 00 2241-66 S co CCGG 66.210 -999.990 S.. R5 2001 07 06 14 24 00 -14.2500 -170.5700 60.30 42.00 18.30 125281 SMO 2001 06 19 22 12 00 2242-66 S co CCGG 57.880 -999.990 S.. R5 2001 07 06 14 37 00 -14.2500 -170.5700 60.30 42.00 18.30 125282 SMO 2001 06 19 22 50 00 329-99 D co CCGG 54.650 -999.990 ... R5 2001 06 27 14 08 00 -14.2500 -170.5700 47.00 42.00 5.00 125283 SMO 2001 06 19 22 50 00 330-99 D co CCGG 54.220 -999.990 ... R5 2001 06 27 14 21 00 -14.2500 -170.5700 47.00 42.00 5.00 125284 SMO 2001 06 26 00 11 00 2067-66 S co CCGG 59.440 -999.990 S.. R5 2001 07 06 14 50 00 -14.2500 -170.5700 60.30 42.00 18.30 125285 SMO 2001 06 26 00 11 00 2068-66 S co CCGG 60.170 -999.990 S.. R5 2001 07 06 15 03 00 -14.2500 -170.5700 60.30 42.00 18.30 125286 SMO 2001 06 26 01 10 00 339-99 D co CCGG 58.110 -999.990 ... R5 2001 07 06 15 18 00 -14.2500 -170.5700 47.00 42.00 5.00 125287 SMO 2001 06 26 01 10 00 340-99 D co CCGG 58.390 -999.990 ... R5 2001 07 06 15 31 00 -14.2500 -170.5700 47.00 42.00 5.00 125288 SMO 2001 07 09 21 10 00 2333-66 S co CCGG 58.890 -999.990 S.. R5 2001 08 02 15 33 00 -14.2500 -170.5700 60.30 42.00 18.30 125289 SMO 2001 07 09 21 10 00 2334-66 S co CCGG 58.940 -999.990 S.. R5 2001 08 02 15 46 00 -14.2500 -170.5700 60.30 42.00 18.30 125290 SMO 2001 07 09 22 06 00 253-99 D co CCGG 57.020 -999.990 ... R5 2001 08 02 09 10 00 -14.2500 -170.5700 47.00 42.00 5.00 125291 SMO 2001 07 09 22 06 00 254-99 D co CCGG 56.520 -999.990 ... R5 2001 08 02 09 23 00 -14.2500 -170.5700 47.00 42.00 5.00 125292 SMO 2001 07 25 00 43 00 373-99 D co CCGG 59.600 -999.990 ... R5 2001 08 01 16 03 00 -14.2500 -170.5700 47.00 42.00 5.00 125293 SMO 2001 07 31 22 07 00 2052-66 S co CCGG 387.360 -999.990 S.C R5 2001 08 30 14 56 00 -14.2500 -170.5700 60.30 42.00 18.30 125294 SMO 2001 07 31 22 59 00 1809-91 D co CCGG 64.620 -999.990 ... R5 2001 08 23 14 34 00 -14.2500 -170.5700 47.00 42.00 5.00 125295 SMO 2001 07 31 22 59 00 1810-91 D co CCGG 65.420 -999.990 ... R5 2001 08 23 14 47 00 -14.2500 -170.5700 47.00 42.00 5.00 125296 SMO 2001 08 08 00 09 00 2087-66 S co CCGG 58.990 -999.990 S.. R5 2001 08 30 13 09 00 -14.2500 -170.5700 60.30 42.00 18.30 125297 SMO 2001 08 08 00 09 00 2088-66 S co CCGG 59.210 -999.990 S.. R5 2001 08 30 13 23 00 -14.2500 -170.5700 60.30 42.00 18.30 125298 SMO 2001 08 08 01 46 00 221-99 D co CCGG 56.970 -999.990 ... R5 2001 08 23 15 02 00 -14.2500 -170.5700 47.00 42.00 5.00 125299 SMO 2001 08 08 01 46 00 222-99 D co CCGG 57.470 -999.990 ... R5 2001 08 23 15 15 00 -14.2500 -170.5700 47.00 42.00 5.00 125300 SMO 2001 08 13 22 08 00 2107-66 S co CCGG 61.300 -999.990 S.. R5 2001 08 30 12 43 00 -14.2500 -170.5700 60.30 42.00 18.30 125301 SMO 2001 08 13 22 08 00 2108-66 S co CCGG 62.900 -999.990 S.. R5 2001 08 30 12 56 00 -14.2500 -170.5700 60.30 42.00 18.30 125302 SMO 2001 08 13 22 36 00 651-91 D co CCGG 58.310 -999.990 ... R5 2001 08 31 14 32 00 -14.2500 -170.5700 47.00 42.00 5.00 125303 SMO 2001 08 13 22 36 00 652-91 D co CCGG 58.940 -999.990 ... R5 2001 08 31 14 45 00 -14.2500 -170.5700 47.00 42.00 5.00 125304 SMO 2001 08 21 21 11 00 2213-66 S co CCGG 66.740 -999.990 S.. R5 2001 09 10 12 16 00 -14.2500 -170.5700 60.30 42.00 18.30 125305 SMO 2001 08 21 21 11 00 2214-66 S co CCGG 66.390 -999.990 S.. R5 2001 09 10 12 29 00 -14.2500 -170.5700 60.30 42.00 18.30 125306 SMO 2001 08 21 22 10 00 4525-91 D co CCGG 63.620 -999.990 ... R5 2001 09 04 08 43 00 -14.2500 -170.5700 47.00 42.00 5.00 125307 SMO 2001 08 21 22 10 00 4526-91 D co CCGG 64.640 -999.990 ... R5 2001 09 04 08 56 00 -14.2500 -170.5700 47.00 42.00 5.00 125308 SMO 2001 08 29 21 10 00 2301-66 S co CCGG 68.620 -999.990 S.. R5 2001 09 10 13 08 00 -14.2500 -170.5700 60.30 42.00 18.30 125309 SMO 2001 08 29 21 10 00 2302-66 S co CCGG 67.850 -999.990 S.. R5 2001 09 10 13 21 00 -14.2500 -170.5700 60.30 42.00 18.30 125310 SMO 2001 08 29 22 57 00 285-99 D co CCGG 67.630 -999.990 ... R5 2001 09 07 15 50 00 -14.2500 -170.5700 47.00 42.00 5.00 125311 SMO 2001 08 29 22 57 00 286-99 D co CCGG 67.310 -999.990 ... R5 2001 09 07 16 03 00 -14.2500 -170.5700 47.00 42.00 5.00 125312 SMO 2001 09 05 00 11 00 2003-66 S co CCGG 84.080 -999.990 S.. R5 2001 10 24 15 28 00 -14.2500 -170.5700 60.30 42.00 18.30 125313 SMO 2001 09 05 00 11 00 2004-66 S co CCGG 83.670 -999.990 S.. R5 2001 10 24 15 41 00 -14.2500 -170.5700 60.30 42.00 18.30 125314 SMO 2001 09 05 00 50 00 4687-91 D co CCGG 76.970 -999.990 ... R5 2001 10 16 11 52 00 -14.2500 -170.5700 47.00 42.00 5.00 125315 SMO 2001 09 05 00 50 00 4688-91 D co CCGG 77.130 -999.990 ... R5 2001 10 16 12 05 00 -14.2500 -170.5700 47.00 42.00 5.00 125316 SMO 2001 09 18 00 09 00 2333-66 S co CCGG 82.280 -999.990 S.. R5 2001 10 24 15 54 00 -14.2500 -170.5700 60.30 42.00 18.30 125317 SMO 2001 09 18 00 09 00 2334-66 S co CCGG 81.590 -999.990 S.. R5 2001 10 24 16 07 00 -14.2500 -170.5700 60.30 42.00 18.30 125318 SMO 2001 09 18 00 58 00 4129-91 D co CCGG 78.120 -999.990 ... R5 2001 10 16 14 07 00 -14.2500 -170.5700 47.00 42.00 5.00 125319 SMO 2001 09 18 00 58 00 4130-91 D co CCGG 78.500 -999.990 ... R5 2001 10 16 14 20 00 -14.2500 -170.5700 47.00 42.00 5.00 125320 SMO 2001 09 25 00 08 00 2133-66 S co CCGG 68.460 -999.990 S.. R5 2001 10 11 12 51 00 -14.2500 -170.5700 60.30 42.00 18.30 125321 SMO 2001 09 25 00 08 00 2134-66 S co CCGG 68.360 -999.990 S.. R5 2001 10 11 13 04 00 -14.2500 -170.5700 60.30 42.00 18.30 125322 SMO 2001 09 25 01 12 00 307-99 D co CCGG 63.810 -999.990 ... R5 2001 10 15 10 00 00 -14.2500 -170.5700 47.00 42.00 5.00 125323 SMO 2001 09 25 01 12 00 308-99 D co CCGG 65.330 -999.990 ... R5 2001 10 15 10 13 00 -14.2500 -170.5700 47.00 42.00 5.00 125324 SMO 2001 10 03 01 01 00 4447-91 D co CCGG 66.660 -999.990 ... R5 2001 11 16 10 40 00 -14.2500 -170.5700 47.00 42.00 5.00 125325 SMO 2001 10 03 01 01 00 4448-91 D co CCGG 65.500 -999.990 ... R5 2001 11 16 10 53 00 -14.2500 -170.5700 47.00 42.00 5.00 125326 SMO 2001 10 11 01 24 00 1077-91 D co CCGG 73.100 -999.990 ... R5 2001 11 15 16 32 00 -14.2500 -170.5700 47.00 42.00 5.00 125327 SMO 2001 10 11 01 24 00 1078-91 D co CCGG 71.940 -999.990 ... R5 2001 11 15 16 45 00 -14.2500 -170.5700 47.00 42.00 5.00 125328 SMO 2001 10 17 22 30 00 233-91 D co CCGG 78.850 -999.990 ... R5 2001 11 14 15 21 00 -14.2500 -170.5700 47.00 42.00 5.00 125329 SMO 2001 10 17 22 30 00 234-91 D co CCGG 78.590 -999.990 ... R5 2001 11 14 15 34 00 -14.2500 -170.5700 47.00 42.00 5.00 125330 SMO 2001 10 23 01 15 00 4811-91 D co CCGG 72.590 -999.990 ... R5 2001 11 14 14 49 00 -14.2500 -170.5700 47.00 42.00 5.00 125331 SMO 2001 10 23 01 15 00 4812-91 D co CCGG 70.080 -999.990 ... R5 2001 11 14 15 02 00 -14.2500 -170.5700 47.00 42.00 5.00 125332 SMO 2001 10 29 22 08 00 2107-66 S co CCGG 68.810 -999.990 S.. R5 2001 11 29 15 12 00 -14.2500 -170.5700 60.30 42.00 18.30 125333 SMO 2001 10 29 22 08 00 2108-66 S co CCGG 69.100 -999.990 S.. R5 2001 11 29 15 25 00 -14.2500 -170.5700 60.30 42.00 18.30 125334 SMO 2001 10 29 23 00 00 1801-91 D co CCGG 66.840 -999.990 ... R5 2001 11 27 16 52 00 -14.2500 -170.5700 47.00 42.00 5.00 125335 SMO 2001 10 29 23 00 00 1802-91 D co CCGG 65.880 -999.990 ... R5 2001 11 27 17 05 00 -14.2500 -170.5700 47.00 42.00 5.00 125336 SMO 2001 11 07 00 08 00 2209-66 S co CCGG 74.900 -999.990 S.. R5 2001 11 29 14 46 00 -14.2500 -170.5700 60.30 42.00 18.30 125337 SMO 2001 11 07 00 08 00 2210-66 S co CCGG 74.900 -999.990 S.. R5 2001 11 29 14 59 00 -14.2500 -170.5700 60.30 42.00 18.30 125338 SMO 2001 11 07 01 02 00 53-91 D co CCGG 71.550 -999.990 ... R5 2001 11 28 10 56 00 -14.2500 -170.5700 47.00 42.00 5.00 125339 SMO 2001 11 07 01 02 00 54-91 D co CCGG 70.780 -999.990 ... R5 2001 11 28 11 09 00 -14.2500 -170.5700 47.00 42.00 5.00 125340 SMO 2001 11 15 02 08 00 2167-66 S co CCGG 67.110 -999.990 S.. R5 2001 12 11 10 59 00 -14.2500 -170.5700 60.30 42.00 18.30 125341 SMO 2001 11 15 02 08 00 2168-66 S co CCGG 66.320 -999.990 S.. R5 2001 12 11 11 12 00 -14.2500 -170.5700 60.30 42.00 18.30 125342 SMO 2001 11 15 02 43 00 4381-91 D co CCGG 63.040 -999.990 ... R5 2001 12 10 14 12 00 -14.2500 -170.5700 47.00 42.00 5.00 125343 SMO 2001 11 15 02 43 00 4382-91 D co CCGG 62.120 -999.990 ... R5 2001 12 10 14 25 00 -14.2500 -170.5700 47.00 42.00 5.00 125344 SMO 2001 11 20 00 54 00 4157-91 D co CCGG 65.550 -999.990 ... R5 2001 12 10 12 54 00 -14.2500 -170.5700 47.00 42.00 5.00 125345 SMO 2001 11 20 00 54 00 4158-91 D co CCGG 64.450 -999.990 ... R5 2001 12 10 13 07 00 -14.2500 -170.5700 47.00 42.00 5.00 125346 SMO 2001 11 27 00 10 00 2067-66 S co CCGG 66.400 -999.990 S.. R5 2001 12 11 10 32 00 -14.2500 -170.5700 60.30 42.00 18.30 125347 SMO 2001 11 27 00 10 00 2068-66 S co CCGG 66.860 -999.990 S.. R5 2001 12 11 10 45 00 -14.2500 -170.5700 60.30 42.00 18.30 125348 SMO 2001 11 27 00 59 00 421-99 D co CCGG 66.640 -999.990 ... R5 2002 01 02 16 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125349 SMO 2001 11 27 00 59 00 422-99 D co CCGG 65.380 -999.990 ... R5 2002 01 02 16 57 00 -14.2500 -170.5700 47.00 42.00 5.00 125350 SMO 2001 12 08 00 22 00 2041-66 S co CCGG 71.550 -999.990 S.. R5 2002 02 04 14 22 00 -14.2500 -170.5700 60.30 42.00 18.30 125351 SMO 2001 12 08 00 22 00 2042-66 S co CCGG 68.460 -999.990 S.. R5 2002 02 04 14 36 00 -14.2500 -170.5700 60.30 42.00 18.30 125352 SMO 2001 12 08 01 20 00 611-91 D co CCGG 65.520 -999.990 ... R5 2002 01 03 10 56 00 -14.2500 -170.5700 47.00 42.00 5.00 125353 SMO 2001 12 08 01 20 00 612-91 D co CCGG 65.610 -999.990 ... R5 2002 01 03 11 10 00 -14.2500 -170.5700 47.00 42.00 5.00 125354 SMO 2001 12 14 01 22 00 2213-66 S co CCGG 61.210 -999.990 S.. R5 2002 02 04 13 56 00 -14.2500 -170.5700 60.30 42.00 18.30 125355 SMO 2001 12 14 01 22 00 2214-66 S co CCGG 59.820 -999.990 S.. R5 2002 02 04 14 09 00 -14.2500 -170.5700 60.30 42.00 18.30 125356 SMO 2001 12 14 02 45 00 1613-91 D co CCGG 56.460 -999.990 ... R5 2002 01 22 14 19 00 -14.2500 -170.5700 47.00 42.00 5.00 125357 SMO 2001 12 14 02 45 00 1614-91 D co CCGG 56.660 -999.990 ... R5 2002 01 22 14 32 00 -14.2500 -170.5700 47.00 42.00 5.00 125358 SMO 2001 12 19 01 33 00 241-99 D co CCGG 66.510 -999.990 ... R5 2002 01 22 15 11 00 -14.2500 -170.5700 47.00 42.00 5.00 125359 SMO 2001 12 19 01 33 00 242-99 D co CCGG 66.660 -999.990 ... R5 2002 01 22 15 24 00 -14.2500 -170.5700 47.00 42.00 5.00 125360 SMO 2002 01 03 03 15 00 313-99 D co CCGG 64.700 -999.990 ... R5 2002 01 30 13 31 00 -14.2500 -170.5700 47.00 42.00 5.00 125361 SMO 2002 01 03 03 15 00 314-99 D co CCGG 64.990 -999.990 ... R5 2002 01 30 13 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125362 SMO 2002 01 10 00 59 00 347-99 D co CCGG 58.370 -999.990 ... R5 2002 01 24 14 03 00 -14.2500 -170.5700 47.00 42.00 5.00 125363 SMO 2002 01 10 00 59 00 348-99 D co CCGG 57.940 -999.990 ... R5 2002 01 24 14 16 00 -14.2500 -170.5700 47.00 42.00 5.00 125364 SMO 2002 01 18 21 13 00 421-91 D co CCGG 61.960 -999.990 ... R5 2002 02 05 15 18 00 -14.2500 -170.5700 47.00 42.00 5.00 125365 SMO 2002 01 18 21 13 00 421-91 D co CCGG 154.770 -999.990 A.. R5 2003 03 14 13 39 00 -14.2500 -170.5700 47.00 42.00 5.00 125365 SMO 2002 01 18 21 13 00 422-91 D co CCGG 61.860 -999.990 ... R5 2002 02 05 15 31 00 -14.2500 -170.5700 47.00 42.00 5.00 125366 SMO 2002 01 18 21 13 00 422-91 D co CCGG 153.400 -999.990 A.. R5 2003 03 14 13 52 00 -14.2500 -170.5700 47.00 42.00 5.00 125366 SMO 2002 01 18 22 40 00 2067-66 S co CCGG 64.740 -999.990 S.. R5 2002 02 14 13 40 00 -14.2500 -170.5700 60.30 42.00 18.30 125367 SMO 2002 01 18 22 40 00 2068-66 S co CCGG 64.720 -999.990 S.. R5 2002 02 14 13 53 00 -14.2500 -170.5700 60.30 42.00 18.30 125368 SMO 2002 01 24 01 14 00 725-91 D co CCGG 59.030 -999.990 ... R5 2002 02 05 15 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125369 SMO 2002 01 24 01 14 00 726-91 D co CCGG 59.090 -999.990 ... R5 2002 02 05 15 58 00 -14.2500 -170.5700 47.00 42.00 5.00 125370 SMO 2002 01 24 03 47 00 2167-66 S co CCGG 62.740 -999.990 S.. R5 2002 02 14 14 58 00 -14.2500 -170.5700 60.30 42.00 18.30 125371 SMO 2002 01 24 03 47 00 2168-66 S co CCGG 61.430 -999.990 S.. R5 2002 02 14 15 11 00 -14.2500 -170.5700 60.30 42.00 18.30 125372 SMO 2002 01 29 01 23 00 2163-66 S co CCGG 59.770 -999.990 S.. R5 2002 03 20 12 17 00 -14.2500 -170.5700 60.30 42.00 18.30 125373 SMO 2002 01 29 01 23 00 2164-66 S co CCGG 58.390 -999.990 S.. R5 2002 03 20 12 30 00 -14.2500 -170.5700 60.30 42.00 18.30 125374 SMO 2002 01 29 01 51 00 224-99 D co CCGG 53.320 -999.990 ... R5 2002 02 14 12 06 00 -14.2500 -170.5700 47.00 42.00 5.00 125375 SMO 2002 01 29 04 24 00 363-99 D co CCGG 52.480 -999.990 ... R5 2002 02 14 11 53 00 -14.2500 -170.5700 47.00 42.00 5.00 125376 SMO 2002 02 04 02 24 00 2019-66 S co CCGG 66.480 -999.990 S.. R5 2002 03 20 11 50 00 -14.2500 -170.5700 60.30 42.00 18.30 125377 SMO 2002 02 04 02 24 00 2020-66 S co CCGG 65.370 -999.990 S.. R5 2002 03 20 12 03 00 -14.2500 -170.5700 60.30 42.00 18.30 125378 SMO 2002 02 04 03 05 00 2043-91 D co CCGG 62.680 -999.990 ... R5 2002 02 22 14 53 00 -14.2500 -170.5700 47.00 42.00 5.00 125379 SMO 2002 02 04 03 05 00 2044-91 D co CCGG 61.800 -999.990 ... R5 2002 02 22 15 06 00 -14.2500 -170.5700 47.00 42.00 5.00 125380 SMO 2002 02 15 01 12 00 177-98 D co CCGG 55.400 -999.990 ... R5 2002 03 07 14 27 00 -14.2500 -170.5700 47.00 42.00 5.00 125381 SMO 2002 02 15 01 12 00 178-98 D co CCGG 55.510 -999.990 ... R5 2002 03 07 14 40 00 -14.2500 -170.5700 47.00 42.00 5.00 125382 SMO 2002 02 21 02 18 00 449-91 D co CCGG 63.070 -999.990 ... R5 2002 03 07 13 57 00 -14.2500 -170.5700 47.00 42.00 5.00 125383 SMO 2002 02 21 02 18 00 450-91 D co CCGG 63.700 -999.990 ... R5 2002 03 07 14 10 00 -14.2500 -170.5700 47.00 42.00 5.00 125384 SMO 2002 02 21 04 22 00 2213-66 S co CCGG 63.480 -999.990 S.. R5 2002 03 20 10 03 00 -14.2500 -170.5700 60.30 42.00 18.30 125385 SMO 2002 02 21 04 22 00 2214-66 S co CCGG 63.830 -999.990 S.. R5 2002 03 20 10 16 00 -14.2500 -170.5700 60.30 42.00 18.30 125386 SMO 2002 02 27 03 06 00 4687-91 D co CCGG 61.280 -999.990 ... R5 2002 03 13 12 07 00 -14.2500 -170.5700 47.00 42.00 5.00 125387 SMO 2002 02 27 03 06 00 4688-91 D co CCGG 61.720 -999.990 ... R5 2002 03 13 12 20 00 -14.2500 -170.5700 47.00 42.00 5.00 125388 SMO 2002 02 27 04 22 00 2133-66 S co CCGG 62.170 -999.990 S.. R5 2002 03 20 11 23 00 -14.2500 -170.5700 60.30 42.00 18.30 125389 SMO 2002 02 27 04 22 00 2134-66 S co CCGG 61.430 -999.990 S.. R5 2002 03 20 11 36 00 -14.2500 -170.5700 60.30 42.00 18.30 125390 SMO 2002 03 05 01 21 00 2015-66 S co CCGG 61.290 -999.990 S.. R5 2002 04 08 14 16 00 -14.2500 -170.5700 60.30 42.00 18.30 125391 SMO 2002 03 05 01 21 00 2016-66 S co CCGG 63.870 -999.990 S.. R5 2002 04 08 14 29 00 -14.2500 -170.5700 60.30 42.00 18.30 125392 SMO 2002 03 05 02 52 00 457-91 D co CCGG 56.710 -999.990 ... R5 2002 03 26 14 31 00 -14.2500 -170.5700 47.00 42.00 5.00 125393 SMO 2002 03 05 02 52 00 458-91 D co CCGG 57.290 -999.990 ... R5 2002 03 26 14 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125394 SMO 2002 03 12 02 10 00 4991-91 D co CCGG 69.890 -999.990 .X. R5 2002 03 26 14 57 00 -14.2500 -170.5700 47.00 42.00 5.00 125395 SMO 2002 03 12 02 10 00 4992-91 D co CCGG 70.460 -999.990 .X. R5 2002 03 26 15 10 00 -14.2500 -170.5700 47.00 42.00 5.00 125396 SMO 2002 03 19 22 55 00 4017-91 D co CCGG 52.870 -999.990 ... R5 2002 04 08 13 24 00 -14.2500 -170.5700 47.00 42.00 5.00 125397 SMO 2002 03 19 22 55 00 4018-91 D co CCGG 53.260 -999.990 ... R5 2002 04 08 13 37 00 -14.2500 -170.5700 47.00 42.00 5.00 125398 SMO 2002 03 19 23 20 00 2090-66 S co CCGG 57.510 -999.990 S.. R5 2002 04 08 14 42 00 -14.2500 -170.5700 60.30 42.00 18.30 125399 SMO 2002 03 26 00 20 00 2241-66 S co CCGG 64.010 -999.990 S.. R5 2002 04 16 16 51 00 -14.2500 -170.5700 60.30 42.00 18.30 125400 SMO 2002 03 26 00 20 00 2242-66 S co CCGG 64.120 -999.990 S.. R5 2002 04 16 17 04 00 -14.2500 -170.5700 60.30 42.00 18.30 125401 SMO 2002 03 26 01 40 00 381-91 D co CCGG 60.760 -999.990 ... R5 2002 04 08 13 50 00 -14.2500 -170.5700 47.00 42.00 5.00 125402 SMO 2002 03 26 01 40 00 382-91 D co CCGG 60.020 -999.990 ... R5 2002 04 08 14 03 00 -14.2500 -170.5700 47.00 42.00 5.00 125403 SMO 2002 04 02 02 21 00 2333-66 S co CCGG 53.710 -999.990 S.. R5 2002 04 16 16 25 00 -14.2500 -170.5700 60.30 42.00 18.30 125404 SMO 2002 04 02 02 21 00 2334-66 S co CCGG 53.760 -999.990 S.. R5 2002 04 16 16 38 00 -14.2500 -170.5700 60.30 42.00 18.30 125405 SMO 2002 04 02 03 52 00 1429-91 D co CCGG 51.920 -999.990 ... R5 2002 04 25 09 10 00 -14.2500 -170.5700 47.00 42.00 5.00 125406 SMO 2002 04 02 03 52 00 1430-91 D co CCGG 51.650 -999.990 ... R5 2002 04 25 09 23 00 -14.2500 -170.5700 47.00 42.00 5.00 125407 SMO 2002 04 09 02 21 00 2041-66 S co CCGG 54.230 -999.990 S.. R5 2002 07 08 14 14 00 -14.2500 -170.5700 60.30 42.00 18.30 125408 SMO 2002 04 09 02 21 00 2042-66 S co CCGG 54.340 -999.990 S.. R5 2002 07 08 14 27 00 -14.2500 -170.5700 60.30 42.00 18.30 125409 SMO 2002 04 09 04 01 00 219-91 D co CCGG 50.180 -999.990 ... R5 2002 04 25 09 36 00 -14.2500 -170.5700 47.00 42.00 5.00 125410 SMO 2002 04 09 04 01 00 220-91 D co CCGG 49.960 -999.990 ... R5 2002 04 25 09 49 00 -14.2500 -170.5700 47.00 42.00 5.00 125411 SMO 2002 04 19 01 22 00 2087-66 S co CCGG 57.520 -999.990 S.. R5 2002 07 08 14 40 00 -14.2500 -170.5700 60.30 42.00 18.30 125412 SMO 2002 04 19 01 22 00 2088-66 S co CCGG 58.040 -999.990 S.. R5 2002 07 08 14 53 00 -14.2500 -170.5700 60.30 42.00 18.30 125413 SMO 2002 04 19 02 22 00 4370-91 D co CCGG 45.140 -999.990 ... R5 2002 05 28 14 55 00 -14.2500 -170.5700 47.00 42.00 5.00 125414 SMO 2002 04 22 01 31 00 4507-91 D co CCGG 52.850 -999.990 ... R5 2002 05 13 15 08 00 -14.2500 -170.5700 47.00 42.00 5.00 125415 SMO 2002 04 22 01 31 00 4508-91 D co CCGG 53.330 -999.990 ... R5 2002 05 13 15 21 00 -14.2500 -170.5700 47.00 42.00 5.00 125416 SMO 2002 04 22 03 45 00 2093-66 S co CCGG 56.500 -999.990 S.. R5 2002 07 08 13 48 00 -14.2500 -170.5700 60.30 42.00 18.30 125417 SMO 2002 04 22 03 45 00 2094-66 S co CCGG 59.480 -999.990 S.. R5 2002 07 08 14 01 00 -14.2500 -170.5700 60.30 42.00 18.30 125418 SMO 2002 04 30 01 23 00 2261-66 S co CCGG 56.210 -999.990 S.. R5 2002 07 08 13 22 00 -14.2500 -170.5700 60.30 42.00 18.30 125419 SMO 2002 04 30 01 23 00 2262-66 S co CCGG 68.960 -999.990 S.. R5 2002 07 08 13 35 00 -14.2500 -170.5700 60.30 42.00 18.30 125420 SMO 2002 04 30 02 01 00 1485-91 D co CCGG 54.250 -999.990 ... R5 2002 06 04 14 28 00 -14.2500 -170.5700 47.00 42.00 5.00 125421 SMO 2002 04 30 02 01 00 1486-91 D co CCGG 55.950 -999.990 ... R5 2002 06 04 14 41 00 -14.2500 -170.5700 47.00 42.00 5.00 125422 SMO 2002 05 11 23 58 00 653-91 D co CCGG 55.200 -999.990 ... R5 2002 06 04 15 46 00 -14.2500 -170.5700 47.00 42.00 5.00 125423 SMO 2002 05 11 23 58 00 654-91 D co CCGG 55.110 -999.990 ... R5 2002 06 04 15 59 00 -14.2500 -170.5700 47.00 42.00 5.00 125424 SMO 2002 05 14 21 50 00 709-91 D co CCGG 56.010 -999.990 ... R5 2002 06 05 14 02 00 -14.2500 -170.5700 47.00 42.00 5.00 125425 SMO 2002 05 14 21 50 00 710-91 D co CCGG 55.840 -999.990 ... R5 2002 06 05 14 16 00 -14.2500 -170.5700 47.00 42.00 5.00 125426 SMO 2002 05 14 23 20 00 479-91 S co CCGG 53.540 -999.990 S.. R5 2002 06 05 14 29 00 -14.2500 -170.5700 60.30 42.00 18.30 125427 SMO 2002 05 14 23 20 00 480-91 S co CCGG 52.650 -999.990 S.. R5 2002 06 05 14 42 00 -14.2500 -170.5700 60.30 42.00 18.30 125428 SMO 2002 05 17 18 18 00 4737-91 S co CCGG 54.410 -999.990 S.. R5 2002 06 06 11 04 00 -14.2500 -170.5700 60.30 42.00 18.30 125429 SMO 2002 05 17 18 18 00 4738-91 S co CCGG 54.200 -999.990 S.. R5 2002 06 06 11 17 00 -14.2500 -170.5700 60.30 42.00 18.30 125430 SMO 2002 05 21 04 19 00 71-91 S co CCGG 54.390 -999.990 S.. R5 2002 06 06 11 30 00 -14.2500 -170.5700 60.30 42.00 18.30 125431 SMO 2002 05 21 04 19 00 72-91 S co CCGG 95.480 -999.990 S.. R5 2002 06 06 11 43 00 -14.2500 -170.5700 60.30 42.00 18.30 125432 SMO 2002 05 21 22 38 00 77-99 D co CCGG 54.730 -999.990 ... R5 2002 06 18 13 28 00 -14.2500 -170.5700 47.00 42.00 5.00 125433 SMO 2002 05 21 22 38 00 78-99 D co CCGG 53.930 -999.990 ... R5 2002 06 18 13 41 00 -14.2500 -170.5700 47.00 42.00 5.00 125434 SMO 2002 05 27 23 42 00 679-91 D co CCGG 62.150 -999.990 ... R5 2002 06 18 13 55 00 -14.2500 -170.5700 47.00 42.00 5.00 125435 SMO 2002 05 27 23 42 00 680-91 D co CCGG 61.470 -999.990 ... R5 2002 06 18 14 08 00 -14.2500 -170.5700 47.00 42.00 5.00 125436 SMO 2002 05 28 00 21 00 1813-91 S co CCGG 60.350 -999.990 S.. R5 2002 06 20 14 06 00 -14.2500 -170.5700 60.30 42.00 18.30 125437 SMO 2002 05 28 00 21 00 1814-91 S co CCGG 60.000 -999.990 S.. R5 2002 06 20 14 19 00 -14.2500 -170.5700 60.30 42.00 18.30 125438 SMO 2002 06 05 21 20 00 407-91 S co CCGG 57.360 -999.990 S.. R5 2002 07 09 09 56 00 -14.2500 -170.5700 60.30 42.00 18.30 125439 SMO 2002 06 05 21 20 00 408-91 S co CCGG 58.660 -999.990 S.. R5 2002 07 09 10 09 00 -14.2500 -170.5700 60.30 42.00 18.30 125440 SMO 2002 06 05 22 08 00 1067-91 D co CCGG 56.190 -999.990 ... R5 2002 06 20 13 40 00 -14.2500 -170.5700 47.00 42.00 5.00 125441 SMO 2002 06 05 22 08 00 1068-91 D co CCGG 56.360 -999.990 ... R5 2002 06 20 13 53 00 -14.2500 -170.5700 47.00 42.00 5.00 125442 SMO 2002 06 10 01 21 00 6453-66 S co CCGG 57.340 -999.990 S.. R5 2002 07 09 10 49 00 -14.2500 -170.5700 60.30 42.00 18.30 125443 SMO 2002 06 10 01 21 00 6454-66 S co CCGG 57.730 -999.990 S.. R5 2002 07 09 11 02 00 -14.2500 -170.5700 60.30 42.00 18.30 125444 SMO 2002 06 10 01 39 00 237-91 D co CCGG 57.370 -999.990 ... R5 2002 07 05 13 19 00 -14.2500 -170.5700 47.00 42.00 5.00 125445 SMO 2002 06 10 01 39 00 238-91 D co CCGG 56.780 -999.990 ... R5 2002 07 05 13 32 00 -14.2500 -170.5700 47.00 42.00 5.00 125446 SMO 2002 06 18 00 21 00 6329-66 S co CCGG 58.690 -999.990 S.. R5 2002 07 05 13 45 00 -14.2500 -170.5700 60.30 42.00 18.30 125447 SMO 2002 06 18 00 21 00 6330-66 S co CCGG 58.440 -999.990 S.. R5 2002 07 05 13 58 00 -14.2500 -170.5700 60.30 42.00 18.30 125448 SMO 2002 06 18 03 13 00 6375-66 D co CCGG -999.990 -999.990 *.. R5 2002 07 15 10 53 00 -14.2500 -170.5700 47.00 42.00 5.00 125449 SMO 2002 06 18 03 13 00 6376-66 D co CCGG 57.790 -999.990 ..< R5 2002 07 15 11 06 00 -14.2500 -170.5700 47.00 42.00 5.00 125450 SMO 2002 06 26 00 21 00 6901-66 S co CCGG 57.420 -999.990 S.. R5 2002 07 15 14 00 00 -14.2500 -170.5700 60.30 42.00 18.30 125451 SMO 2002 06 26 00 21 00 6902-66 S co CCGG 56.540 -999.990 S.. R5 2002 07 15 14 13 00 -14.2500 -170.5700 60.30 42.00 18.30 125452 SMO 2002 06 26 01 55 00 6183-66 D co CCGG 58.800 -999.990 ... R5 2002 07 15 09 07 00 -14.2500 -170.5700 47.00 42.00 5.00 125453 SMO 2002 06 26 01 55 00 6184-66 D co CCGG 58.360 -999.990 ... R5 2002 07 15 09 20 00 -14.2500 -170.5700 47.00 42.00 5.00 125454 SMO 2002 07 02 00 01 00 6443-66 S co CCGG 56.910 -999.990 S.. R5 2002 07 15 11 47 00 -14.2500 -170.5700 60.30 42.00 18.30 125455 SMO 2002 07 02 00 01 00 6444-66 S co CCGG 55.800 -999.990 S.. R5 2002 07 15 12 00 00 -14.2500 -170.5700 60.30 42.00 18.30 125456 SMO 2002 07 02 01 55 00 6169-66 D co CCGG 57.570 -999.990 ... R5 2002 07 24 13 21 00 -14.2500 -170.5700 47.00 42.00 5.00 125457 SMO 2002 07 02 01 55 00 6170-66 D co CCGG 58.310 -999.990 ... R5 2002 07 24 13 34 00 -14.2500 -170.5700 47.00 42.00 5.00 125458 SMO 2002 07 11 00 23 00 6479-66 S co CCGG 55.730 -999.990 S.. R5 2002 07 24 12 55 00 -14.2500 -170.5700 60.30 42.00 18.30 125459 SMO 2002 07 11 00 23 00 6480-66 S co CCGG 56.420 -999.990 S.. R5 2002 07 24 13 08 00 -14.2500 -170.5700 60.30 42.00 18.30 125460 SMO 2002 07 11 02 08 00 6663-66 D co CCGG 55.800 -999.990 ... R5 2002 07 26 15 38 00 -14.2500 -170.5700 47.00 42.00 5.00 125461 SMO 2002 07 11 02 08 00 6664-66 D co CCGG 56.690 -999.990 ... R5 2002 07 26 15 51 00 -14.2500 -170.5700 47.00 42.00 5.00 125462 SMO 2002 07 19 00 20 00 6891-66 S co CCGG 61.350 -999.990 S.. R5 2002 08 06 16 12 00 -14.2500 -170.5700 60.30 42.00 18.30 125463 SMO 2002 07 19 00 20 00 6892-66 S co CCGG 60.900 -999.990 S.. R5 2002 08 06 16 25 00 -14.2500 -170.5700 60.30 42.00 18.30 125464 SMO 2002 07 19 04 36 00 6291-66 D co CCGG 60.630 -999.990 ... R5 2002 07 26 15 12 00 -14.2500 -170.5700 47.00 42.00 5.00 125465 SMO 2002 07 19 04 36 00 6292-66 D co CCGG 60.870 -999.990 ... R5 2002 07 26 15 25 00 -14.2500 -170.5700 47.00 42.00 5.00 125466 SMO 2002 07 23 03 24 00 6397-66 D co CCGG 58.410 -999.990 ... R5 2002 08 06 15 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125469 SMO 2002 07 23 03 24 00 6398-66 D co CCGG 58.390 -999.990 ... R5 2002 08 06 15 57 00 -14.2500 -170.5700 47.00 42.00 5.00 125470 SMO 2002 07 31 00 20 00 1187-91 S co CCGG 57.030 -999.990 S.. R5 2002 08 12 15 38 00 -14.2500 -170.5700 60.30 42.00 18.30 125471 SMO 2002 07 31 00 20 00 1188-91 S co CCGG 57.480 -999.990 S.. R5 2002 08 12 15 51 00 -14.2500 -170.5700 60.30 42.00 18.30 125472 SMO 2002 07 31 02 36 00 6395-66 D co CCGG 57.330 -999.990 ... R5 2002 08 22 10 56 00 -14.2500 -170.5700 47.00 42.00 5.00 125473 SMO 2002 07 31 02 36 00 6396-66 D co CCGG 57.410 -999.990 ... R5 2002 08 22 11 09 00 -14.2500 -170.5700 47.00 42.00 5.00 125474 SMO 2002 08 06 00 20 00 547-99 S co CCGG 64.520 -999.990 S.. R5 2002 09 03 11 34 00 -14.2500 -170.5700 60.30 42.00 18.30 125475 SMO 2002 08 06 00 20 00 548-99 S co CCGG 64.650 -999.990 S.. R5 2002 09 03 11 48 00 -14.2500 -170.5700 60.30 42.00 18.30 125476 SMO 2002 08 06 01 42 00 33-98 D co CCGG 63.990 -999.990 ... R5 2002 08 21 15 52 00 -14.2500 -170.5700 47.00 42.00 5.00 125477 SMO 2002 08 06 01 42 00 34-98 D co CCGG 64.150 -999.990 ... R5 2002 08 21 16 05 00 -14.2500 -170.5700 47.00 42.00 5.00 125478 SMO 2002 08 14 00 37 00 6271-66 S co CCGG 61.760 -999.990 S.. R5 2002 09 10 14 43 00 -14.2500 -170.5700 60.30 42.00 18.30 125479 SMO 2002 08 14 00 37 00 6272-66 S co CCGG 61.310 -999.990 S.. R5 2002 09 10 14 57 00 -14.2500 -170.5700 60.30 42.00 18.30 125480 SMO 2002 08 14 01 10 00 529-91 D co CCGG 61.650 -999.990 ... R5 2002 09 03 11 08 00 -14.2500 -170.5700 47.00 42.00 5.00 125481 SMO 2002 08 14 01 10 00 530-91 D co CCGG 60.320 -999.990 ... R5 2002 09 03 11 21 00 -14.2500 -170.5700 47.00 42.00 5.00 125482 SMO 2002 08 26 20 20 00 6583-66 S co CCGG 70.610 -999.990 S.. R5 2002 09 10 15 10 00 -14.2500 -170.5700 60.30 42.00 18.30 125483 SMO 2002 08 26 20 20 00 6584-66 S co CCGG 70.660 -999.990 S.. R5 2002 09 10 15 23 00 -14.2500 -170.5700 60.30 42.00 18.30 125484 SMO 2002 08 26 22 45 00 1969-91 D co CCGG 70.530 -999.990 ... R5 2002 09 24 12 36 00 -14.2500 -170.5700 47.00 42.00 5.00 125485 SMO 2002 08 26 22 45 00 1970-91 D co CCGG 70.370 -999.990 ... R5 2002 09 24 12 49 00 -14.2500 -170.5700 47.00 42.00 5.00 125486 SMO 2002 09 05 00 20 00 329-99 S co CCGG 58.550 -999.990 S.. R5 2002 09 24 13 04 00 -14.2500 -170.5700 60.30 42.00 18.30 125487 SMO 2002 09 05 00 20 00 330-99 S co CCGG 58.940 -999.990 S.. R5 2002 09 24 13 17 00 -14.2500 -170.5700 60.30 42.00 18.30 125488 SMO 2002 09 05 01 46 00 583-99 D co CCGG 58.300 -999.990 ... R5 2002 09 24 13 57 00 -14.2500 -170.5700 47.00 42.00 5.00 125489 SMO 2002 09 05 01 46 00 584-99 D co CCGG 58.460 -999.990 ... R5 2002 09 24 14 10 00 -14.2500 -170.5700 47.00 42.00 5.00 125490 SMO 2002 09 10 00 20 00 1861-91 S co CCGG 66.050 -999.990 S.. R5 2002 09 24 13 30 00 -14.2500 -170.5700 60.30 42.00 18.30 125491 SMO 2002 09 10 00 20 00 1862-91 S co CCGG 66.460 -999.990 S.. R5 2002 09 24 13 43 00 -14.2500 -170.5700 60.30 42.00 18.30 125492 SMO 2002 09 10 03 03 00 4193-91 D co CCGG 66.410 -999.990 ... R5 2002 09 26 15 06 00 -14.2500 -170.5700 47.00 42.00 5.00 125493 SMO 2002 09 10 03 03 00 4194-91 D co CCGG 65.640 -999.990 ... R5 2002 09 26 15 19 00 -14.2500 -170.5700 47.00 42.00 5.00 125494 SMO 2002 09 17 00 21 00 765-91 S co CCGG 67.890 -999.990 S.. R5 2002 09 26 15 34 00 -14.2500 -170.5700 60.30 42.00 18.30 125495 SMO 2002 09 17 00 21 00 766-91 S co CCGG 68.420 -999.990 S.. R5 2002 09 26 15 47 00 -14.2500 -170.5700 60.30 42.00 18.30 125496 SMO 2002 09 17 01 05 00 29-99 D co CCGG 68.430 -999.990 P.. R5 2002 10 10 14 23 00 -14.2500 -170.5700 47.00 42.00 5.00 125497 SMO 2002 09 17 01 05 00 30-99 D co CCGG 12.420 -999.990 P.C R5 2002 10 10 14 36 00 -14.2500 -170.5700 47.00 42.00 5.00 125498 SMO 2002 09 24 21 10 00 111-91 S co CCGG 77.470 -999.990 S.. R5 2002 10 10 13 57 00 -14.2500 -170.5700 60.30 42.00 18.30 125499 SMO 2002 09 24 21 10 00 112-91 S co CCGG 77.500 -999.990 S.. R5 2002 10 10 14 10 00 -14.2500 -170.5700 60.30 42.00 18.30 125500 SMO 2002 09 24 22 37 00 303-91 D co CCGG 77.900 -999.990 ... R5 2002 10 09 16 20 00 -14.2500 -170.5700 47.00 42.00 5.00 125501 SMO 2002 09 24 22 37 00 304-91 D co CCGG 78.140 -999.990 ... R5 2002 10 09 16 33 00 -14.2500 -170.5700 47.00 42.00 5.00 125502 SMO 2002 09 30 20 20 00 4713-91 S co CCGG 70.370 -999.990 S.. R5 2002 10 09 14 22 00 -14.2500 -170.5700 60.30 42.00 18.30 125503 SMO 2002 09 30 20 20 00 4714-91 S co CCGG 69.300 -999.990 S.. R5 2002 10 09 14 35 00 -14.2500 -170.5700 60.30 42.00 18.30 125504 SMO 2002 10 04 23 39 00 231-99 D co CCGG 71.380 -999.990 ... R5 2002 10 22 15 45 00 -14.2500 -170.5700 47.00 42.00 5.00 125505 SMO 2002 10 04 23 39 00 232-99 D co CCGG 71.500 -999.990 ... R5 2002 10 22 15 58 00 -14.2500 -170.5700 47.00 42.00 5.00 125506 SMO 2002 10 08 00 21 00 1287-91 S co CCGG 73.870 -999.990 S.. R5 2002 10 28 16 12 00 -14.2500 -170.5700 60.30 42.00 18.30 125507 SMO 2002 10 08 00 21 00 1288-91 S co CCGG 72.080 -999.990 S.. R5 2002 10 28 16 25 00 -14.2500 -170.5700 60.30 42.00 18.30 125508 SMO 2002 10 08 01 37 00 683-99 D co CCGG 71.070 -999.990 ... R5 2002 10 22 16 37 00 -14.2500 -170.5700 47.00 42.00 5.00 125509 SMO 2002 10 08 01 37 00 684-99 D co CCGG 70.910 -999.990 ... R5 2002 10 22 16 50 00 -14.2500 -170.5700 47.00 42.00 5.00 125510 SMO 2002 10 15 00 20 00 117-98 S co CCGG 69.690 -999.990 S.. R5 2002 10 29 11 27 00 -14.2500 -170.5700 60.30 42.00 18.30 125511 SMO 2002 10 15 00 20 00 118-98 S co CCGG 70.030 -999.990 S.. R5 2002 10 29 11 40 00 -14.2500 -170.5700 60.30 42.00 18.30 125512 SMO 2002 10 15 02 27 00 129-99 D co CCGG 70.290 -999.990 ... R5 2002 11 05 14 26 00 -14.2500 -170.5700 47.00 42.00 5.00 125513 SMO 2002 10 15 02 27 00 130-99 D co CCGG 70.650 -999.990 ... R5 2002 11 05 14 39 00 -14.2500 -170.5700 47.00 42.00 5.00 125514 SMO 2002 10 22 01 09 00 4447-91 S co CCGG 79.300 -999.990 S.. R5 2002 11 11 11 42 00 -14.2500 -170.5700 60.30 42.00 18.30 125515 SMO 2002 10 22 01 09 00 4448-91 S co CCGG 79.010 -999.990 S.. R5 2002 11 11 11 55 00 -14.2500 -170.5700 60.30 42.00 18.30 125516 SMO 2002 10 22 02 38 00 121-99 D co CCGG 79.060 -999.990 ... R5 2002 11 05 15 18 00 -14.2500 -170.5700 47.00 42.00 5.00 125517 SMO 2002 10 22 02 38 00 122-99 D co CCGG 79.850 -999.990 ... R5 2002 11 05 15 31 00 -14.2500 -170.5700 47.00 42.00 5.00 125518 SMO 2002 10 29 03 38 00 49-99 D co CCGG 73.610 -999.990 ... R5 2002 11 19 15 52 00 -14.2500 -170.5700 47.00 42.00 5.00 125519 SMO 2002 10 29 03 38 00 50-99 D co CCGG 72.490 -999.990 ... R5 2002 11 19 16 05 00 -14.2500 -170.5700 47.00 42.00 5.00 125520 SMO 2002 10 30 00 20 00 29-91 S co CCGG 73.720 -999.990 S.. R5 2002 11 11 13 01 00 -14.2500 -170.5700 60.30 42.00 18.30 125521 SMO 2002 10 30 00 20 00 30-91 S co CCGG 73.290 -999.990 S.. R5 2002 11 11 13 14 00 -14.2500 -170.5700 60.30 42.00 18.30 125522 SMO 2002 11 05 20 24 00 1615-91 S co CCGG 68.320 -999.990 S.. R5 2002 11 27 14 01 00 -14.2500 -170.5700 60.30 42.00 18.30 125523 SMO 2002 11 05 20 24 00 1616-91 S co CCGG 67.990 -999.990 S.. R5 2002 11 27 14 15 00 -14.2500 -170.5700 60.30 42.00 18.30 125524 SMO 2002 11 05 20 50 00 333-91 D co CCGG 68.410 -999.990 ... R5 2002 11 19 14 31 00 -14.2500 -170.5700 47.00 42.00 5.00 125525 SMO 2002 11 05 20 50 00 334-91 D co CCGG 68.760 -999.990 ... R5 2002 11 19 14 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125526 SMO 2002 11 13 00 20 00 1389-91 S co CCGG 72.280 -999.990 S.. R5 2002 11 27 14 28 00 -14.2500 -170.5700 60.30 42.00 18.30 125527 SMO 2002 11 13 00 20 00 1390-91 S co CCGG 72.210 -999.990 S.. R5 2002 11 27 14 41 00 -14.2500 -170.5700 60.30 42.00 18.30 125528 SMO 2002 11 13 01 54 00 615-91 D co CCGG 73.220 -999.990 ... R5 2002 12 02 15 34 00 -14.2500 -170.5700 47.00 42.00 5.00 125529 SMO 2002 11 13 01 54 00 616-91 D co CCGG 73.960 -999.990 ... R5 2002 12 02 15 47 00 -14.2500 -170.5700 47.00 42.00 5.00 125530 SMO 2002 11 19 00 20 00 849-91 S co CCGG 70.350 -999.990 S.. R5 2002 12 02 12 22 00 -14.2500 -170.5700 60.30 42.00 18.30 125531 SMO 2002 11 19 00 20 00 850-91 S co CCGG 70.220 -999.990 S.. R5 2002 12 02 12 35 00 -14.2500 -170.5700 60.30 42.00 18.30 125532 SMO 2002 11 19 01 21 00 485-99 D co CCGG 71.650 -999.990 ... R5 2002 12 12 15 00 00 -14.2500 -170.5700 47.00 42.00 5.00 125533 SMO 2002 11 19 01 21 00 486-99 D co CCGG 71.080 -999.990 ... R5 2002 12 12 15 13 00 -14.2500 -170.5700 47.00 42.00 5.00 125534 SMO 2002 11 26 00 20 00 4873-91 S co CCGG 75.950 -999.990 S.. R5 2002 12 12 13 42 00 -14.2500 -170.5700 60.30 42.00 18.30 125535 SMO 2002 11 26 00 20 00 4874-91 S co CCGG 76.010 -999.990 S.. R5 2002 12 12 13 55 00 -14.2500 -170.5700 60.30 42.00 18.30 125536 SMO 2002 11 26 01 10 00 715-91 D co CCGG 75.600 -999.990 ... R5 2002 12 16 14 27 00 -14.2500 -170.5700 47.00 42.00 5.00 125537 SMO 2002 11 26 01 10 00 716-91 D co CCGG 75.770 -999.990 ... R5 2002 12 16 14 40 00 -14.2500 -170.5700 47.00 42.00 5.00 125538 SMO 2002 12 03 00 20 00 4281-91 S co CCGG 67.010 -999.990 S.. R5 2002 12 16 14 01 00 -14.2500 -170.5700 60.30 42.00 18.30 125539 SMO 2002 12 03 00 20 00 4282-91 S co CCGG 66.390 -999.990 S.. R5 2002 12 16 14 14 00 -14.2500 -170.5700 60.30 42.00 18.30 125540 SMO 2002 12 03 01 38 00 427-91 D co CCGG 66.870 -999.990 ... R5 2002 12 26 11 01 00 -14.2500 -170.5700 47.00 42.00 5.00 125541 SMO 2002 12 03 01 38 00 428-91 D co CCGG 67.230 -999.990 ... R5 2002 12 26 11 14 00 -14.2500 -170.5700 47.00 42.00 5.00 125542 SMO 2002 12 11 00 22 00 4833-91 S co CCGG 61.500 -999.990 S.. R5 2003 01 03 15 17 00 -14.2500 -170.5700 60.30 42.00 18.30 125543 SMO 2002 12 11 00 22 00 4834-91 S co CCGG 61.400 -999.990 S.. R5 2003 01 03 15 30 00 -14.2500 -170.5700 60.30 42.00 18.30 125544 SMO 2002 12 11 01 09 00 1193-91 D co CCGG 62.430 -999.990 ... R5 2003 01 07 15 19 00 -14.2500 -170.5700 47.00 42.00 5.00 125545 SMO 2002 12 11 01 09 00 1194-91 D co CCGG 62.010 -999.990 ... R5 2003 01 07 15 32 00 -14.2500 -170.5700 47.00 42.00 5.00 125546 SMO 2002 12 17 00 22 00 1281-91 S co CCGG 67.650 -999.990 S.. R5 2003 01 07 16 12 00 -14.2500 -170.5700 60.30 42.00 18.30 125547 SMO 2002 12 17 00 22 00 1282-91 S co CCGG 65.890 -999.990 S.. R5 2003 01 07 16 25 00 -14.2500 -170.5700 60.30 42.00 18.30 125548 SMO 2002 12 17 01 12 00 10-99 D co CCGG 66.430 -999.990 ... R5 2003 01 16 13 34 00 -14.2500 -170.5700 47.00 42.00 5.00 125550 SMO 2002 12 17 01 12 00 9-99 D co CCGG 66.700 -999.990 ... R5 2003 01 16 13 21 00 -14.2500 -170.5700 47.00 42.00 5.00 125549 SMO 2002 12 24 20 20 00 2043-91 S co CCGG 57.280 -999.990 S.. R5 2003 01 16 13 47 00 -14.2500 -170.5700 60.30 42.00 18.30 125551 SMO 2002 12 24 20 20 00 2044-91 S co CCGG 57.130 -999.990 S.. R5 2003 01 16 14 00 00 -14.2500 -170.5700 60.30 42.00 18.30 125552 SMO 2002 12 24 22 21 00 705-99 D co CCGG 57.490 -999.990 ... R5 2003 01 20 10 17 00 -14.2500 -170.5700 47.00 42.00 5.00 125553 SMO 2002 12 24 22 21 00 706-99 D co CCGG 57.550 -999.990 ... R5 2003 01 20 10 30 00 -14.2500 -170.5700 47.00 42.00 5.00 125554 SMO 2002 12 31 00 20 00 1821-91 S co CCGG 55.350 -999.990 S.. R5 2003 01 20 10 43 00 -14.2500 -170.5700 60.30 42.00 18.30 125555 SMO 2002 12 31 00 20 00 1822-91 S co CCGG 54.860 -999.990 S.. R5 2003 01 20 10 56 00 -14.2500 -170.5700 60.30 42.00 18.30 125556 SMO 2002 12 31 03 53 00 4033-91 D co CCGG 56.090 -999.990 ... R5 2003 01 27 14 55 00 -14.2500 -170.5700 47.00 42.00 5.00 125557 SMO 2002 12 31 03 53 00 4034-91 D co CCGG 55.180 -999.990 ... R5 2003 01 27 15 08 00 -14.2500 -170.5700 47.00 42.00 5.00 125558 SMO 2003 01 08 00 20 00 547-91 S co CCGG 66.540 -999.990 S.. R5 2003 01 27 15 22 00 -14.2500 -170.5700 60.30 42.00 18.30 125559 SMO 2003 01 08 00 20 00 548-91 S co CCGG 65.560 -999.990 S.. R5 2003 01 27 15 35 00 -14.2500 -170.5700 60.30 42.00 18.30 125560 SMO 2003 01 08 01 47 00 6015-66 D co CCGG 65.710 -999.990 ... R5 2003 02 06 12 51 00 -14.2500 -170.5700 47.00 42.00 5.00 125561 SMO 2003 01 08 01 47 00 6016-66 D co CCGG 65.730 -999.990 ... R5 2003 02 06 13 04 00 -14.2500 -170.5700 47.00 42.00 5.00 125562 SMO 2003 01 17 01 40 00 1773-91 S co CCGG 65.910 -999.990 S.. R5 2003 02 07 16 18 00 -14.2500 -170.5700 60.30 42.00 18.30 125563 SMO 2003 01 17 03 01 00 1187-91 D co CCGG 65.230 -999.990 ... R5 2003 02 06 11 59 00 -14.2500 -170.5700 47.00 42.00 5.00 125564 SMO 2003 01 17 03 01 00 1188-91 D co CCGG 65.800 -999.990 ... R5 2003 02 06 12 12 00 -14.2500 -170.5700 47.00 42.00 5.00 125565 SMO 2003 01 23 01 43 00 1407-91 D co CCGG 66.080 -999.990 ... R5 2003 03 14 10 58 00 -14.2500 -170.5700 47.00 42.00 5.00 125566 SMO 2003 01 23 01 43 00 1408-91 D co CCGG 66.000 -999.990 ... R5 2003 03 14 11 11 00 -14.2500 -170.5700 47.00 42.00 5.00 125567 SMO 2003 01 23 02 42 00 2051-91 S co CCGG 67.120 -999.990 S.. R5 2003 03 14 10 32 00 -14.2500 -170.5700 60.30 42.00 18.30 125568 SMO 2003 01 23 02 42 00 2052-91 S co CCGG 66.730 -999.990 S.. R5 2003 03 14 10 45 00 -14.2500 -170.5700 60.30 42.00 18.30 125569 SMO 2003 01 31 00 35 00 865-99 S co CCGG 50.300 -999.990 S.. R5 2003 02 25 13 50 00 -14.2500 -170.5700 60.30 42.00 18.30 125570 SMO 2003 01 31 00 35 00 866-99 S co CCGG 50.410 -999.990 S.. R5 2003 02 25 14 03 00 -14.2500 -170.5700 60.30 42.00 18.30 125571 SMO 2003 01 31 01 45 00 559-99 D co CCGG 50.470 -999.990 ... R5 2003 02 25 14 30 00 -14.2500 -170.5700 47.00 42.00 5.00 125572 SMO 2003 02 05 23 25 00 1225-91 S co CCGG 55.280 -999.990 S.. R5 2003 02 27 11 17 00 -14.2500 -170.5700 60.30 42.00 18.30 125573 SMO 2003 02 05 23 25 00 1226-91 S co CCGG 55.310 -999.990 S.. R5 2003 02 27 11 30 00 -14.2500 -170.5700 60.30 42.00 18.30 125574 SMO 2003 02 07 02 45 00 109-98 D co CCGG 72.220 -999.990 ... R5 2003 02 26 17 18 00 -14.2500 -170.5700 47.00 42.00 5.00 125575 SMO 2003 02 07 02 45 00 110-98 D co CCGG 71.260 -999.990 ... R5 2003 02 26 17 31 00 -14.2500 -170.5700 47.00 42.00 5.00 125576 SMO 2003 02 13 23 22 00 729-91 S co CCGG 66.410 -999.990 S.. R5 2003 03 21 11 32 00 -14.2500 -170.5700 60.30 42.00 18.30 125577 SMO 2003 02 13 23 22 00 730-91 S co CCGG 66.430 -999.990 S.. R5 2003 03 21 11 45 00 -14.2500 -170.5700 60.30 42.00 18.30 125578 SMO 2003 02 14 01 30 00 4901-91 D co CCGG 63.910 -999.990 ... R5 2003 03 14 14 31 00 -14.2500 -170.5700 47.00 42.00 5.00 125579 SMO 2003 02 14 01 30 00 4902-91 D co CCGG 62.830 -999.990 ... R5 2003 03 14 14 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125580 SMO 2003 02 14 02 53 00 4291-91 D co CCGG 62.610 -999.990 ... R5 2003 03 20 16 31 00 -14.2500 -170.5700 47.00 42.00 5.00 125581 SMO 2003 02 14 02 53 00 4292-91 D co CCGG 62.420 -999.990 ... R5 2003 03 20 16 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125582 SMO 2003 02 18 00 19 00 1151-91 S co CCGG 56.070 -999.990 S.. R5 2003 03 14 14 05 00 -14.2500 -170.5700 60.30 42.00 18.30 125583 SMO 2003 02 18 00 19 00 1152-91 S co CCGG 54.640 -999.990 S.. R5 2003 03 14 14 18 00 -14.2500 -170.5700 60.30 42.00 18.30 125584 SMO 2003 02 18 01 52 00 623-99 D co CCGG 55.690 -999.990 ... R5 2003 03 20 11 37 00 -14.2500 -170.5700 47.00 42.00 5.00 125585 SMO 2003 02 18 01 52 00 624-99 D co CCGG 56.600 -999.990 ... R5 2003 03 20 11 50 00 -14.2500 -170.5700 47.00 42.00 5.00 125586 SMO 2003 02 25 01 20 00 4507-91 S co CCGG 53.750 -999.990 S.. R5 2003 03 27 10 59 00 -14.2500 -170.5700 60.30 42.00 18.30 125587 SMO 2003 02 25 01 20 00 4508-91 S co CCGG 54.150 -999.990 S.. R5 2003 03 27 11 12 00 -14.2500 -170.5700 60.30 42.00 18.30 125588 SMO 2003 02 25 03 57 00 465-99 D co CCGG 53.150 -999.990 ... R5 2003 03 20 11 11 00 -14.2500 -170.5700 47.00 42.00 5.00 125589 SMO 2003 02 25 03 57 00 466-99 D co CCGG 52.760 -999.990 ... R5 2003 03 20 11 24 00 -14.2500 -170.5700 47.00 42.00 5.00 125590 SMO 2003 03 06 01 20 00 4867-91 S co CCGG 64.220 -999.990 S.. R5 2003 03 27 11 37 00 -14.2500 -170.5700 60.30 42.00 18.30 125591 SMO 2003 03 06 01 20 00 4868-91 S co CCGG 64.220 -999.990 S.. R5 2003 03 27 11 50 00 -14.2500 -170.5700 60.30 42.00 18.30 125592 SMO 2003 03 06 01 59 00 531-99 D co CCGG 64.520 -999.990 ... R5 2003 03 26 13 49 00 -14.2500 -170.5700 47.00 42.00 5.00 125593 SMO 2003 03 06 01 59 00 532-99 D co CCGG 63.970 -999.990 ... R5 2003 03 26 14 02 00 -14.2500 -170.5700 47.00 42.00 5.00 125594 SMO 2003 03 11 00 20 00 4255-91 S co CCGG 65.510 -999.990 S.. R5 2003 03 26 14 15 00 -14.2500 -170.5700 60.30 42.00 18.30 125595 SMO 2003 03 11 00 20 00 4256-91 S co CCGG 65.230 -999.990 S.. R5 2003 03 26 14 28 00 -14.2500 -170.5700 60.30 42.00 18.30 125596 SMO 2003 03 11 01 09 00 43-98 D co CCGG 65.850 -999.990 ... R5 2003 04 03 12 26 00 -14.2500 -170.5700 47.00 42.00 5.00 125597 SMO 2003 03 11 01 09 00 44-98 D co CCGG 68.250 -999.990 ... R5 2003 04 03 12 39 00 -14.2500 -170.5700 47.00 42.00 5.00 125598 SMO 2003 03 18 00 20 00 409-99 S co CCGG 68.620 -999.990 S.. R5 2003 04 03 12 53 00 -14.2500 -170.5700 60.30 42.00 18.30 125599 SMO 2003 03 18 00 20 00 410-99 S co CCGG 67.940 -999.990 S.. R5 2003 04 03 13 06 00 -14.2500 -170.5700 60.30 42.00 18.30 125600 SMO 2003 03 18 01 30 00 1637-91 D co CCGG 68.560 -999.990 ... R5 2003 04 07 12 38 00 -14.2500 -170.5700 47.00 42.00 5.00 125601 SMO 2003 03 18 01 30 00 1638-91 D co CCGG 68.430 -999.990 ... R5 2003 04 07 12 51 00 -14.2500 -170.5700 47.00 42.00 5.00 125602 SMO 2003 03 27 00 33 00 843-99 S co CCGG 63.940 -999.990 S.. R5 2003 04 07 14 50 00 -14.2500 -170.5700 60.30 42.00 18.30 125603 SMO 2003 03 27 00 33 00 844-99 S co CCGG 64.370 -999.990 S.. R5 2003 04 07 15 03 00 -14.2500 -170.5700 60.30 42.00 18.30 125604 SMO 2003 03 27 01 37 00 821-99 D co CCGG 64.060 -999.990 ... R5 2003 04 16 11 59 00 -14.2500 -170.5700 47.00 42.00 5.00 125605 SMO 2003 03 27 01 37 00 822-99 D co CCGG 63.610 -999.990 ... R5 2003 04 16 12 12 00 -14.2500 -170.5700 47.00 42.00 5.00 125606 SMO 2003 04 01 00 19 00 1681-91 S co CCGG 56.470 -999.990 S.. R5 2003 04 16 12 25 00 -14.2500 -170.5700 60.30 42.00 18.30 125607 SMO 2003 04 01 00 19 00 1682-91 S co CCGG 56.320 -999.990 S.. R5 2003 04 16 12 38 00 -14.2500 -170.5700 60.30 42.00 18.30 125608 SMO 2003 04 01 04 23 00 617-99 D co CCGG 54.630 -999.990 ... R5 2003 04 14 13 42 00 -14.2500 -170.5700 47.00 42.00 5.00 125609 SMO 2003 04 01 04 23 00 618-99 D co CCGG 54.880 -999.990 ... R5 2003 04 14 13 55 00 -14.2500 -170.5700 47.00 42.00 5.00 125610 SMO 2003 04 11 00 11 00 295-99 S co CCGG 60.880 -999.990 S.. R5 2003 05 16 15 55 00 -14.2500 -170.5700 60.30 42.00 18.30 125611 SMO 2003 04 11 00 11 00 296-99 S co CCGG 62.180 -999.990 S.. R5 2003 05 16 16 08 00 -14.2500 -170.5700 60.30 42.00 18.30 125612 SMO 2003 04 18 02 15 00 249-91 D co CCGG 68.460 -999.990 ... R5 2003 05 07 14 27 00 -14.2500 -170.5700 47.00 42.00 5.00 125613 SMO 2003 04 18 02 15 00 250-91 D co CCGG 66.880 -999.990 ... R5 2003 05 07 14 40 00 -14.2500 -170.5700 47.00 42.00 5.00 125614 SMO 2003 04 18 03 10 00 131-91 S co CCGG 66.360 -999.990 S.. R5 2003 05 07 14 53 00 -14.2500 -170.5700 60.30 42.00 18.30 125615 SMO 2003 04 18 03 10 00 132-91 S co CCGG 66.920 -999.990 S.. R5 2003 05 07 15 06 00 -14.2500 -170.5700 60.30 42.00 18.30 125616 SMO 2003 04 22 00 10 00 515-99 S co CCGG 53.330 -999.990 S.. R5 2003 05 16 16 21 00 -14.2500 -170.5700 60.30 42.00 18.30 125617 SMO 2003 04 22 00 10 00 516-99 S co CCGG 52.040 -999.990 S.. R5 2003 05 16 16 34 00 -14.2500 -170.5700 60.30 42.00 18.30 125618 SMO 2003 04 22 02 45 00 4613-91 D co CCGG 51.610 -999.990 ... R5 2003 05 16 11 02 00 -14.2500 -170.5700 47.00 42.00 5.00 125619 SMO 2003 04 22 02 45 00 4614-91 D co CCGG 51.830 -999.990 ... R5 2003 05 16 11 15 00 -14.2500 -170.5700 47.00 42.00 5.00 125620 SMO 2003 04 30 00 10 00 4449-91 S co CCGG 58.390 -999.990 S.. R5 2003 05 16 10 34 00 -14.2500 -170.5700 60.30 42.00 18.30 125621 SMO 2003 04 30 00 10 00 4450-91 S co CCGG 56.670 -999.990 S.. R5 2003 05 16 10 47 00 -14.2500 -170.5700 60.30 42.00 18.30 125622 SMO 2003 04 30 01 55 00 25-91 D co CCGG 56.130 -999.990 ... R5 2003 05 27 10 28 00 -14.2500 -170.5700 47.00 42.00 5.00 125623 SMO 2003 04 30 01 55 00 26-91 D co CCGG 57.000 -999.990 ... R5 2003 05 27 10 41 00 -14.2500 -170.5700 47.00 42.00 5.00 125624 SMO 2003 05 06 21 57 00 4061-91 D co CCGG 53.430 -999.990 ... R5 2003 05 27 10 02 00 -14.2500 -170.5700 47.00 42.00 5.00 125625 SMO 2003 05 06 21 57 00 4062-91 D co CCGG 55.370 -999.990 ... R5 2003 05 27 10 15 00 -14.2500 -170.5700 47.00 42.00 5.00 125626 SMO 2003 05 06 23 11 00 1103-99 S co CCGG 54.250 -999.990 S.. R5 2003 05 27 09 36 00 -14.2500 -170.5700 60.30 42.00 18.30 125627 SMO 2003 05 06 23 11 00 1332-91 S co CCGG 54.790 -999.990 S.. R5 2003 05 27 09 49 00 -14.2500 -170.5700 60.30 42.00 18.30 125628 SMO 2003 05 12 22 35 00 1961-91 S co CCGG 54.670 -999.990 S.. R5 2003 05 29 10 18 00 -14.2500 -170.5700 60.30 42.00 18.30 125629 SMO 2003 05 12 22 35 00 1962-91 S co CCGG 54.870 -999.990 S.. R5 2003 05 29 10 31 00 -14.2500 -170.5700 60.30 42.00 18.30 125630 SMO 2003 05 13 00 24 00 4411-91 D co CCGG 52.260 -999.990 ... R5 2003 05 29 10 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125631 SMO 2003 05 13 00 24 00 4412-91 D co CCGG 51.780 -999.990 ... R5 2003 05 29 10 57 00 -14.2500 -170.5700 47.00 42.00 5.00 125632 SMO 2003 05 23 21 42 00 515-91 S co CCGG 58.310 -999.990 S.. R5 2003 07 08 13 04 00 -14.2500 -170.5700 60.30 42.00 18.30 125633 SMO 2003 05 23 21 42 00 516-91 S co CCGG 57.730 -999.990 S.. R5 2003 07 08 13 17 00 -14.2500 -170.5700 60.30 42.00 18.30 125634 SMO 2003 05 24 00 02 00 755-91 D co CCGG 56.150 -999.990 ... R5 2003 07 08 13 30 00 -14.2500 -170.5700 47.00 42.00 5.00 125635 SMO 2003 05 24 00 02 00 756-91 D co CCGG 56.600 -999.990 ... R5 2003 07 08 13 43 00 -14.2500 -170.5700 47.00 42.00 5.00 125636 SMO 2003 05 28 00 10 00 985-99 S co CCGG 54.210 -999.990 S.. R5 2003 07 03 14 33 00 -14.2500 -170.5700 60.30 42.00 18.30 125637 SMO 2003 05 28 00 10 00 986-99 S co CCGG 54.360 -999.990 S.. R5 2003 07 03 14 46 00 -14.2500 -170.5700 60.30 42.00 18.30 125638 SMO 2003 05 30 02 46 00 635-99 D co CCGG 60.160 -999.990 ... R5 2003 06 26 12 45 00 -14.2500 -170.5700 47.00 42.00 5.00 125639 SMO 2003 05 30 02 46 00 636-99 D co CCGG 59.020 -999.990 ... R5 2003 06 26 12 58 00 -14.2500 -170.5700 47.00 42.00 5.00 125640 SMO 2003 06 07 02 10 00 1459-99 S co CCGG 60.810 -999.990 S.. R5 2003 06 26 11 51 00 -14.2500 -170.5700 60.30 42.00 18.30 125641 SMO 2003 06 07 02 10 00 1460-99 S co CCGG 60.710 -999.990 S.. R5 2003 06 26 12 04 00 -14.2500 -170.5700 60.30 42.00 18.30 125642 SMO 2003 06 10 00 10 00 1153-99 S co CCGG 58.710 -999.990 S.. R5 2003 06 23 16 14 00 -14.2500 -170.5700 60.30 42.00 18.30 125643 SMO 2003 06 10 00 10 00 1154-99 S co CCGG 57.680 -999.990 S.. R5 2003 06 23 16 27 00 -14.2500 -170.5700 60.30 42.00 18.30 125644 SMO 2003 06 10 00 50 00 1467-99 D co CCGG 57.230 -999.990 ... R5 2003 07 01 12 31 00 -14.2500 -170.5700 47.00 42.00 5.00 125645 SMO 2003 06 10 00 50 00 1468-99 D co CCGG 57.400 -999.990 ... R5 2003 07 01 12 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125646 SMO 2003 06 19 00 22 00 65-98 D co CCGG 56.770 -999.990 ... R5 2003 07 01 13 23 00 -14.2500 -170.5700 47.00 42.00 5.00 125647 SMO 2003 06 19 00 22 00 66-98 D co CCGG 56.250 -999.990 ... R5 2003 07 01 13 37 00 -14.2500 -170.5700 47.00 42.00 5.00 125648 SMO 2003 06 19 01 00 00 1425-99 S co CCGG 58.740 -999.990 S.. R5 2003 07 25 10 17 00 -14.2500 -170.5700 60.30 42.00 18.30 125649 SMO 2003 06 19 01 00 00 1426-99 S co CCGG 56.330 -999.990 S.. R5 2003 07 25 10 30 00 -14.2500 -170.5700 60.30 42.00 18.30 125650 SMO 2003 06 28 01 47 00 155-98 D co CCGG 56.720 -999.990 ... R5 2003 07 25 10 45 00 -14.2500 -170.5700 47.00 42.00 5.00 125651 SMO 2003 06 28 01 47 00 156-98 D co CCGG 57.020 -999.990 ... R5 2003 07 25 10 58 00 -14.2500 -170.5700 47.00 42.00 5.00 125652 SMO 2003 06 28 03 55 00 1423-99 S co CCGG 59.040 -999.990 S.. R5 2003 07 25 09 25 00 -14.2500 -170.5700 60.30 42.00 18.30 125653 SMO 2003 06 28 03 55 00 1424-99 S co CCGG 58.730 -999.990 S.. R5 2003 07 25 09 38 00 -14.2500 -170.5700 60.30 42.00 18.30 125654 SMO 2003 07 02 00 11 00 1031-99 S co CCGG 56.300 -999.990 S.. R5 2003 07 25 09 51 00 -14.2500 -170.5700 60.30 42.00 18.30 125655 SMO 2003 07 02 00 11 00 1032-99 S co CCGG 56.580 -999.990 S.. R5 2003 07 25 10 04 00 -14.2500 -170.5700 60.30 42.00 18.30 125656 SMO 2003 07 02 00 52 00 879-99 D co CCGG 56.160 -999.990 ... R5 2003 07 30 15 15 00 -14.2500 -170.5700 47.00 42.00 5.00 125657 SMO 2003 07 02 00 52 00 880-99 D co CCGG 55.800 -999.990 ... R5 2003 07 30 15 28 00 -14.2500 -170.5700 47.00 42.00 5.00 125658 SMO 2003 07 08 00 10 00 969-99 S co CCGG 59.760 -999.990 S.. R5 2003 07 30 15 41 00 -14.2500 -170.5700 60.30 42.00 18.30 125659 SMO 2003 07 08 00 10 00 970-99 S co CCGG 60.410 -999.990 S.. R5 2003 07 30 15 54 00 -14.2500 -170.5700 60.30 42.00 18.30 125660 SMO 2003 07 08 01 15 00 1375-99 D co CCGG 60.390 -999.990 ... R5 2003 07 31 14 05 00 -14.2500 -170.5700 47.00 42.00 5.00 125661 SMO 2003 07 08 01 15 00 1376-99 D co CCGG 59.400 -999.990 ... R5 2003 07 31 14 18 00 -14.2500 -170.5700 47.00 42.00 5.00 125662 SMO 2003 07 16 00 11 00 369-91 S co CCGG 61.190 -999.990 S.. R5 2003 08 12 13 21 00 -14.2500 -170.5700 60.30 42.00 18.30 125663 SMO 2003 07 16 00 11 00 370-91 S co CCGG 60.770 -999.990 S.. R5 2003 08 12 13 34 00 -14.2500 -170.5700 60.30 42.00 18.30 125664 SMO 2003 07 16 01 43 00 4721-91 D co CCGG 59.600 -999.990 ... R5 2003 07 31 14 33 00 -14.2500 -170.5700 47.00 42.00 5.00 125665 SMO 2003 07 16 01 43 00 4722-91 D co CCGG 58.950 -999.990 ... R5 2003 07 31 14 46 00 -14.2500 -170.5700 47.00 42.00 5.00 125666 SMO 2003 07 24 00 10 00 4847-98 S co CCGG 57.910 -999.990 S.. R5 2003 08 12 12 55 00 -14.2500 -170.5700 60.30 42.00 18.30 125667 SMO 2003 07 24 00 10 00 4848-98 S co CCGG 57.440 -999.990 S.. R5 2003 08 12 13 08 00 -14.2500 -170.5700 60.30 42.00 18.30 125668 SMO 2003 07 24 00 53 00 1653-99 D co CCGG 58.030 -999.990 ... R5 2003 08 07 10 31 00 -14.2500 -170.5700 47.00 42.00 5.00 125669 SMO 2003 07 24 00 53 00 1654-99 D co CCGG 57.570 -999.990 ... R5 2003 08 07 10 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125670 SMO 2003 07 30 00 10 00 1151-99 S co CCGG 58.650 -999.990 S.. R5 2003 08 18 13 07 00 -14.2500 -170.5700 60.30 42.00 18.30 125671 SMO 2003 07 30 00 10 00 1152-99 S co CCGG 57.950 -999.990 S.. R5 2003 08 18 13 20 00 -14.2500 -170.5700 60.30 42.00 18.30 125672 SMO 2003 07 30 01 00 00 1657-99 D co CCGG 58.210 -999.990 ... R5 2003 08 07 10 58 00 -14.2500 -170.5700 47.00 42.00 5.00 125673 SMO 2003 07 30 01 00 00 1658-99 D co CCGG 58.190 -999.990 ... R5 2003 08 07 11 11 00 -14.2500 -170.5700 47.00 42.00 5.00 125674 SMO 2003 08 07 00 10 00 575-99 S co CCGG 63.190 -999.990 S.. R5 2003 08 18 12 39 00 -14.2500 -170.5700 60.30 42.00 18.30 125675 SMO 2003 08 07 00 10 00 576-99 S co CCGG 63.060 -999.990 S.. R5 2003 08 18 12 52 00 -14.2500 -170.5700 60.30 42.00 18.30 125676 SMO 2003 08 07 00 48 00 6077-66 D co CCGG 61.320 -999.990 ... R5 2003 08 21 11 45 00 -14.2500 -170.5700 47.00 42.00 5.00 125677 SMO 2003 08 07 00 48 00 6078-66 D co CCGG 61.620 -999.990 ... R5 2003 08 21 11 32 00 -14.2500 -170.5700 47.00 42.00 5.00 125678 SMO 2003 08 12 00 10 00 6607-66 S co CCGG 57.260 -999.990 S.. R5 2003 08 21 11 03 00 -14.2500 -170.5700 60.30 42.00 18.30 125679 SMO 2003 08 12 00 10 00 6608-66 S co CCGG 56.420 -999.990 S.. R5 2003 08 21 11 16 00 -14.2500 -170.5700 60.30 42.00 18.30 125680 SMO 2003 08 12 01 15 00 6001-66 D co CCGG 56.970 -999.990 ... R5 2003 08 22 10 07 00 -14.2500 -170.5700 47.00 42.00 5.00 125681 SMO 2003 08 12 01 15 00 6002-66 D co CCGG 56.800 -999.990 ... R5 2003 08 22 10 20 00 -14.2500 -170.5700 47.00 42.00 5.00 125682 SMO 2003 08 22 23 02 00 437-91 D co CCGG 59.150 -999.990 ... R5 2003 09 02 15 41 00 -14.2500 -170.5700 47.00 42.00 5.00 125683 SMO 2003 08 22 23 02 00 438-91 D co CCGG 61.580 -999.990 ... R5 2003 09 02 15 54 00 -14.2500 -170.5700 47.00 42.00 5.00 125684 SMO 2003 08 23 00 40 00 2003-91 S co CCGG 58.550 -999.990 S.. R5 2003 09 02 16 07 00 -14.2500 -170.5700 60.30 42.00 18.30 125685 SMO 2003 08 23 00 40 00 2004-91 S co CCGG 57.610 -999.990 S.. R5 2003 09 02 16 20 00 -14.2500 -170.5700 60.30 42.00 18.30 125686 SMO 2003 08 28 00 10 00 4771-91 S co CCGG -999.990 -999.990 *.. R5 2003 09 05 09 10 00 -14.2500 -170.5700 60.30 42.00 18.30 125687 SMO 2003 08 28 00 10 00 4772-91 S co CCGG -999.990 -999.990 *.. R5 2003 09 05 09 23 00 -14.2500 -170.5700 60.30 42.00 18.30 125688 SMO 2003 08 28 01 20 00 4841-91 D co CCGG -999.990 -999.990 *.. R5 2003 09 05 09 36 00 -14.2500 -170.5700 47.00 42.00 5.00 125689 SMO 2003 08 28 01 20 00 4842-91 D co CCGG -999.990 -999.990 *.. R5 2003 09 05 09 49 00 -14.2500 -170.5700 47.00 42.00 5.00 125690 SMO 2003 09 03 00 10 00 1721-99 S co CCGG 64.140 -999.990 S.. R5 2003 09 12 17 15 00 -14.2500 -170.5700 60.30 42.00 18.30 125691 SMO 2003 09 03 00 10 00 1722-99 S co CCGG 64.560 -999.990 S.< R5 2003 09 12 17 28 00 -14.2500 -170.5700 60.30 42.00 18.30 125692 SMO 2003 09 03 01 00 00 1723-99 D co CCGG 63.850 -999.990 ... R5 2003 09 12 16 47 00 -14.2500 -170.5700 47.00 42.00 5.00 125693 SMO 2003 09 03 01 00 00 1724-99 D co CCGG 63.830 -999.990 ... R5 2003 09 12 17 00 00 -14.2500 -170.5700 47.00 42.00 5.00 125694 SMO 2003 09 09 00 10 00 1981-91 S co CCGG 61.050 -999.990 S.. R5 2003 09 22 16 19 00 -14.2500 -170.5700 60.30 42.00 18.30 125695 SMO 2003 09 09 00 10 00 1982-91 S co CCGG 60.160 -999.990 S.. R5 2003 09 22 16 32 00 -14.2500 -170.5700 60.30 42.00 18.30 125696 SMO 2003 09 09 01 05 00 835-91 D co CCGG 59.440 -999.990 ... R5 2003 09 22 15 00 00 -14.2500 -170.5700 47.00 42.00 5.00 125697 SMO 2003 09 09 01 05 00 836-91 D co CCGG 58.490 -999.990 ... R5 2003 09 22 15 13 00 -14.2500 -170.5700 47.00 42.00 5.00 125698 SMO 2003 09 16 00 10 00 443-99 S co CCGG 59.880 -999.990 S.. R5 2003 09 30 09 40 00 -14.2500 -170.5700 60.30 42.00 18.30 125699 SMO 2003 09 16 00 10 00 444-99 S co CCGG 59.920 -999.990 S.. R5 2003 09 30 09 53 00 -14.2500 -170.5700 60.30 42.00 18.30 125700 SMO 2003 09 16 00 52 00 4987-91 D co CCGG 59.110 -999.990 ... R5 2003 09 30 09 13 00 -14.2500 -170.5700 47.00 42.00 5.00 125701 SMO 2003 09 16 00 52 00 4988-91 D co CCGG 58.750 -999.990 ... R5 2003 09 30 09 26 00 -14.2500 -170.5700 47.00 42.00 5.00 125702 SMO 2003 09 26 22 10 00 1055-99 S co CCGG 73.250 -999.990 S.. R5 2003 10 07 11 26 00 -14.2500 -170.5700 60.30 42.00 18.30 125703 SMO 2003 09 26 22 10 00 1056-99 S co CCGG 73.270 -999.990 S.. R5 2003 10 07 11 39 00 -14.2500 -170.5700 60.30 42.00 18.30 125704 SMO 2003 09 26 22 30 00 1331-99 D co CCGG 73.320 -999.990 ... R5 2003 10 07 11 00 00 -14.2500 -170.5700 47.00 42.00 5.00 125705 SMO 2003 09 26 22 30 00 1332-99 D co CCGG 72.790 -999.990 ... R5 2003 10 07 11 13 00 -14.2500 -170.5700 47.00 42.00 5.00 125706 SMO 2003 09 30 00 11 00 2010-99 S co CCGG 77.520 -999.990 S.. R5 2003 10 14 14 24 00 -14.2500 -170.5700 60.30 42.00 18.30 125707 SMO 2003 09 30 00 11 00 2011-99 S co CCGG 77.990 -999.990 S.. R5 2003 10 14 14 37 00 -14.2500 -170.5700 60.30 42.00 18.30 125708 SMO 2003 09 30 00 50 00 2009-99 D co CCGG 73.830 -999.990 ... R5 2003 10 14 14 50 00 -14.2500 -170.5700 47.00 42.00 5.00 125709 SMO 2003 09 30 00 50 00 2012-99 D co CCGG 74.240 -999.990 ... R5 2003 10 14 15 03 00 -14.2500 -170.5700 47.00 42.00 5.00 125710 SMO 2003 10 07 00 10 00 327-99 S co CCGG 74.800 -999.990 S.. R5 2003 10 29 13 25 00 -14.2500 -170.5700 60.30 42.00 18.30 125711 SMO 2003 10 07 00 10 00 328-99 S co CCGG 74.640 -999.990 S.. R5 2003 10 29 13 38 00 -14.2500 -170.5700 60.30 42.00 18.30 125712 SMO 2003 10 07 00 40 00 1405-91 D co CCGG 72.250 -999.990 ... R5 2003 10 29 12 07 00 -14.2500 -170.5700 47.00 42.00 5.00 125713 SMO 2003 10 07 00 40 00 1406-91 D co CCGG 72.640 -999.990 ... R5 2003 10 29 12 20 00 -14.2500 -170.5700 47.00 42.00 5.00 125714 SMO 2003 10 13 22 30 00 1801-91 D co CCGG 69.310 -999.990 ... R5 2003 10 29 13 53 00 -14.2500 -170.5700 47.00 42.00 5.00 125715 SMO 2003 10 13 22 30 00 1802-91 D co CCGG 69.450 -999.990 ... R5 2003 10 29 14 06 00 -14.2500 -170.5700 47.00 42.00 5.00 125716 SMO 2003 10 13 22 54 00 4207-91 S co CCGG 73.460 -999.990 S.. R5 2003 10 29 15 11 00 -14.2500 -170.5700 60.30 42.00 18.30 125717 SMO 2003 10 13 22 54 00 4208-91 S co CCGG 74.210 -999.990 S.. R5 2003 10 29 15 24 00 -14.2500 -170.5700 60.30 42.00 18.30 125718 SMO 2003 10 21 01 10 00 1977-99 S co CCGG 62.070 -999.990 S.. R5 2003 11 03 11 57 00 -14.2500 -170.5700 60.30 42.00 18.30 125719 SMO 2003 10 21 01 10 00 1978-99 S co CCGG 61.380 -999.990 S.. R5 2003 11 03 12 10 00 -14.2500 -170.5700 60.30 42.00 18.30 125720 SMO 2003 10 21 01 45 00 343-99 D co CCGG 61.400 -999.990 ... R5 2003 11 03 13 15 00 -14.2500 -170.5700 47.00 42.00 5.00 125721 SMO 2003 10 21 01 45 00 344-99 D co CCGG 61.140 -999.990 ... R5 2003 11 03 13 28 00 -14.2500 -170.5700 47.00 42.00 5.00 125722 SMO 2003 10 28 01 33 00 1603-99 D co CCGG 65.970 -999.990 ... R5 2003 11 11 11 22 00 -14.2500 -170.5700 47.00 42.00 5.00 125723 SMO 2003 10 28 01 33 00 1604-99 D co CCGG 66.000 -999.990 ... R5 2003 11 11 11 35 00 -14.2500 -170.5700 47.00 42.00 5.00 125724 SMO 2003 10 28 02 08 00 509-99 S co CCGG 68.040 -999.990 S.. R5 2003 11 11 11 48 00 -14.2500 -170.5700 60.30 42.00 18.30 125725 SMO 2003 10 28 02 08 00 510-99 S co CCGG 68.120 -999.990 S.. R5 2003 11 11 12 01 00 -14.2500 -170.5700 60.30 42.00 18.30 125726 SMO 2003 11 04 01 49 00 2128-99 D co CCGG 200.490 -999.990 N.. R5 2003 12 29 13 58 00 -14.2500 -170.5700 47.00 42.00 5.00 125727 SMO 2003 11 04 02 40 00 2125-99 S co CCGG 71.510 -999.990 S.. R5 2003 12 23 10 56 00 -14.2500 -170.5700 60.30 42.00 18.30 125728 SMO 2003 11 04 02 40 00 2126-99 S co CCGG 70.270 -999.990 S.. R5 2003 12 23 11 09 00 -14.2500 -170.5700 60.30 42.00 18.30 125729 SMO 2003 11 05 00 21 00 1001-91 D co CCGG 73.910 -999.990 ... R5 2003 12 18 15 21 00 -14.2500 -170.5700 47.00 42.00 5.00 125730 SMO 2003 11 05 00 21 00 1002-91 D co CCGG 73.470 -999.990 ... R5 2003 12 18 15 34 00 -14.2500 -170.5700 47.00 42.00 5.00 125731 SMO 2003 11 14 21 55 00 2137-99 D co CCGG 59.970 -999.990 ... R5 2003 12 31 11 03 00 -14.2500 -170.5700 47.00 42.00 5.00 125732 SMO 2003 11 14 21 55 00 2138-99 D co CCGG 59.770 -999.990 ... R5 2003 12 31 11 16 00 -14.2500 -170.5700 47.00 42.00 5.00 125733 SMO 2003 11 14 22 35 00 2053-99 S co CCGG 62.040 -999.990 S.. R5 2003 12 18 15 47 00 -14.2500 -170.5700 60.30 42.00 18.30 125734 SMO 2003 11 14 22 35 00 2054-99 S co CCGG 62.480 -999.990 S.. R5 2003 12 18 16 00 00 -14.2500 -170.5700 60.30 42.00 18.30 125735 SMO 2003 11 17 00 10 00 2147-99 S co CCGG 61.180 -999.990 S.. R5 2003 12 31 10 09 00 -14.2500 -170.5700 60.30 42.00 18.30 125736 SMO 2003 11 17 00 10 00 2148-99 S co CCGG 61.380 -999.990 S.. R5 2003 12 31 10 22 00 -14.2500 -170.5700 60.30 42.00 18.30 125737 SMO 2003 11 17 00 50 00 443-99 D co CCGG 60.670 -999.990 ... R5 2003 12 23 10 30 00 -14.2500 -170.5700 47.00 42.00 5.00 125738 SMO 2003 11 17 00 50 00 444-99 D co CCGG 60.950 -999.990 ... R5 2003 12 23 10 43 00 -14.2500 -170.5700 47.00 42.00 5.00 125739 SMO 2003 11 24 20 10 00 489-99 S co CCGG 61.010 -999.990 S.. R5 2003 12 23 11 22 00 -14.2500 -170.5700 60.30 42.00 18.30 125740 SMO 2003 11 24 20 10 00 490-99 S co CCGG 60.340 -999.990 S.. R5 2003 12 23 11 35 00 -14.2500 -170.5700 60.30 42.00 18.30 125741 SMO 2003 11 24 21 42 00 2153-99 D co CCGG 58.200 -999.990 ... R5 2003 12 30 12 05 00 -14.2500 -170.5700 47.00 42.00 5.00 125742 SMO 2003 11 24 21 42 00 2154-99 D co CCGG 59.330 -999.990 ... R5 2003 12 30 12 18 00 -14.2500 -170.5700 47.00 42.00 5.00 125743 SMO 2003 12 01 21 30 00 1291-91 S co CCGG 60.110 -999.990 S.. R5 2003 12 30 11 39 00 -14.2500 -170.5700 60.30 42.00 18.30 125744 SMO 2003 12 01 21 30 00 1292-91 S co CCGG 59.280 -999.990 S.. R5 2003 12 30 11 52 00 -14.2500 -170.5700 60.30 42.00 18.30 125745 SMO 2003 12 01 22 05 00 1873-99 D co CCGG 59.240 -999.990 ... R5 2004 01 22 11 32 00 -14.2500 -170.5700 47.00 42.00 5.00 125746 SMO 2003 12 01 22 05 00 1874-99 D co CCGG 58.160 -999.990 ... R5 2004 01 22 11 45 00 -14.2500 -170.5700 47.00 42.00 5.00 125747 SMO 2003 12 11 01 30 00 1839-99 S co CCGG 61.900 -999.990 S.. R5 2004 01 22 13 18 00 -14.2500 -170.5700 60.30 42.00 18.30 125748 SMO 2003 12 11 01 30 00 1840-99 S co CCGG 61.170 -999.990 S.. R5 2004 01 22 13 31 00 -14.2500 -170.5700 60.30 42.00 18.30 125749 SMO 2003 12 11 22 40 00 2145-99 D co CCGG 60.030 -999.990 ... R5 2004 01 22 11 58 00 -14.2500 -170.5700 47.00 42.00 5.00 125750 SMO 2003 12 11 22 40 00 2146-99 D co CCGG 59.580 -999.990 ... R5 2004 01 22 12 11 00 -14.2500 -170.5700 47.00 42.00 5.00 125751 SMO 2003 12 16 01 30 00 2143-99 S co CCGG 62.240 -999.990 S.. R5 2004 01 22 12 24 00 -14.2500 -170.5700 60.30 42.00 18.30 125752 SMO 2003 12 16 01 30 00 2144-99 S co CCGG 61.510 -999.990 S.. R5 2004 01 22 12 37 00 -14.2500 -170.5700 60.30 42.00 18.30 125753 SMO 2003 12 16 04 40 00 2141-99 D co CCGG 59.640 -999.990 ... R5 2004 01 22 17 16 00 -14.2500 -170.5700 47.00 42.00 5.00 125754 SMO 2003 12 16 04 40 00 2142-99 D co CCGG 59.630 -999.990 ... R5 2004 01 22 17 29 00 -14.2500 -170.5700 47.00 42.00 5.00 125755 SMO 2003 12 26 23 00 00 2275-99 D co CCGG 52.350 -999.990 ... R5 2004 01 22 16 50 00 -14.2500 -170.5700 47.00 42.00 5.00 125756 SMO 2003 12 26 23 00 00 2276-99 D co CCGG 52.570 -999.990 ... R5 2004 01 22 17 03 00 -14.2500 -170.5700 47.00 42.00 5.00 125757 SMO 2003 12 27 01 40 00 2139-99 S co CCGG 54.590 -999.990 S.. R5 2004 02 11 13 34 00 -14.2500 -170.5700 60.30 42.00 18.30 125758 SMO 2003 12 27 01 40 00 2140-99 S co CCGG 53.210 -999.990 S.. R5 2004 02 11 13 47 00 -14.2500 -170.5700 60.30 42.00 18.30 125759 SMO 2004 01 01 22 45 00 2277-99 D co CCGG 66.630 -999.990 ... R5 2004 02 13 13 49 00 -14.2500 -170.5700 47.00 42.00 5.00 125760 SMO 2004 01 01 22 45 00 2278-99 D co CCGG 66.170 -999.990 ... R5 2004 02 13 14 02 00 -14.2500 -170.5700 47.00 42.00 5.00 125761 SMO 2004 01 02 00 40 00 2201-99 S co CCGG 69.440 -999.990 S.. R5 2004 02 11 12 15 00 -14.2500 -170.5700 60.30 42.00 18.30 125762 SMO 2004 01 02 00 40 00 2202-99 S co CCGG 68.010 -999.990 S.. R5 2004 02 11 12 28 00 -14.2500 -170.5700 60.30 42.00 18.30 125763 SMO 2004 01 24 03 10 00 2205-99 S co CCGG 49.860 -999.990 S.. R5 2004 02 13 14 15 00 -14.2500 -170.5700 60.30 42.00 18.30 125764 SMO 2004 01 24 03 10 00 2206-99 S co CCGG 48.930 -999.990 S.. R5 2004 02 13 14 29 00 -14.2500 -170.5700 60.30 42.00 18.30 125765 SMO 2004 01 27 01 21 00 4753-91 S co CCGG 48.750 -999.990 S.. R5 2004 02 19 16 06 00 -14.2500 -170.5700 60.30 42.00 18.30 125766 SMO 2004 01 27 01 21 00 4754-91 S co CCGG 46.540 -999.990 S.. R5 2004 02 19 16 19 00 -14.2500 -170.5700 60.30 42.00 18.30 125767 SMO 2004 02 04 02 20 00 279-91 S co CCGG 58.800 -999.990 S.. R5 2004 02 19 16 34 00 -14.2500 -170.5700 60.30 42.00 18.30 125768 SMO 2004 02 04 02 20 00 280-91 S co CCGG 58.480 -999.990 S.. R5 2004 02 19 16 47 00 -14.2500 -170.5700 60.30 42.00 18.30 125769 SMO 2004 02 11 00 40 00 1837-99 S co CCGG 57.580 -999.990 S.. R5 2004 03 09 13 05 00 -14.2500 -170.5700 60.30 42.00 18.30 125770 SMO 2004 02 11 00 40 00 1838-99 S co CCGG 57.810 -999.990 S.. R5 2004 03 09 13 18 00 -14.2500 -170.5700 60.30 42.00 18.30 125771 SMO 2004 02 20 23 50 00 2069-99 G co CCGG 47.880 -999.990 ... R5 2004 03 09 13 31 00 -14.2500 -170.5700 47.00 42.00 5.00 125772 SMO 2004 02 20 23 50 00 2070-99 G co CCGG 47.360 -999.990 ... R5 2004 03 09 13 44 00 -14.2500 -170.5700 47.00 42.00 5.00 125773 SMO 2004 02 21 00 40 00 1497-99 S co CCGG 47.760 -999.990 S.. R5 2004 03 09 12 13 00 -14.2500 -170.5700 60.30 42.00 18.30 125774 SMO 2004 02 21 00 40 00 1498-99 S co CCGG 47.840 -999.990 S.. R5 2004 03 09 12 26 00 -14.2500 -170.5700 60.30 42.00 18.30 125775 SMO 2004 02 24 00 10 00 2467-99 S co CCGG 59.700 -999.990 S.. R5 2004 03 09 12 39 00 -14.2500 -170.5700 60.30 42.00 18.30 125776 SMO 2004 02 24 00 10 00 2468-99 S co CCGG 59.060 -999.990 S.. R5 2004 03 09 12 52 00 -14.2500 -170.5700 60.30 42.00 18.30 125777 SMO 2004 03 05 21 11 00 2875-99 S co CCGG 48.140 -999.990 S.. R5 2004 03 24 11 15 00 -14.2500 -170.5700 60.30 42.00 18.30 125778 SMO 2004 03 05 21 11 00 2876-99 S co CCGG 48.280 -999.990 S.. R5 2004 03 24 11 28 00 -14.2500 -170.5700 60.30 42.00 18.30 125779 SMO 2004 03 09 03 10 00 2877-99 S co CCGG 59.060 -999.990 S.. R5 2004 03 24 11 41 00 -14.2500 -170.5700 60.30 42.00 18.30 125780 SMO 2004 03 09 03 10 00 2878-99 S co CCGG 58.740 -999.990 S.. R5 2004 03 24 11 54 00 -14.2500 -170.5700 60.30 42.00 18.30 125781 SMO 2004 03 16 02 00 00 2453-99 S co CCGG 67.950 -999.990 S.. R5 2004 04 12 18 40 00 -14.2500 -170.5700 60.30 42.00 18.30 125782 SMO 2004 03 16 02 00 00 2454-99 S co CCGG 67.830 -999.990 S.. R5 2004 04 12 18 53 00 -14.2500 -170.5700 60.30 42.00 18.30 125783 SMO 2004 03 27 00 35 00 645-99 S co CCGG 73.170 -999.990 S.. R5 2004 04 12 18 13 00 -14.2500 -170.5700 60.30 42.00 18.30 125784 SMO 2004 03 27 00 35 00 646-99 S co CCGG 73.710 -999.990 S.. R5 2004 04 12 18 27 00 -14.2500 -170.5700 60.30 42.00 18.30 125785 SMO 2004 03 27 23 38 00 943-99 G co CCGG 392.840 -999.990 P.C R5 2004 04 19 13 23 00 -14.2500 -170.5700 47.00 42.00 5.00 125786 SMO 2004 03 27 23 38 00 944-99 G co CCGG 183.710 -999.990 P.. R5 2004 04 19 13 36 00 -14.2500 -170.5700 47.00 42.00 5.00 125787 SMO 2004 04 02 21 20 00 6203-66 G co CCGG 51.540 -999.990 ... R5 2004 04 16 13 29 00 -14.2500 -170.5700 47.00 42.00 5.00 125788 SMO 2004 04 02 21 20 00 6204-66 G co CCGG 52.330 -999.990 ... R5 2004 04 16 13 42 00 -14.2500 -170.5700 47.00 42.00 5.00 125789 SMO 2004 04 03 01 10 00 1787-99 S co CCGG 51.590 -999.990 S.. R5 2004 04 19 13 49 00 -14.2500 -170.5700 60.30 42.00 18.30 125790 SMO 2004 04 03 01 10 00 1788-99 S co CCGG 50.970 -999.990 S.. R5 2004 04 19 14 02 00 -14.2500 -170.5700 60.30 42.00 18.30 125791 SMO 2004 04 07 01 33 00 6231-66 S co CCGG 49.880 -999.990 S.. R5 2004 04 16 13 03 00 -14.2500 -170.5700 60.30 42.00 18.30 125792 SMO 2004 04 07 01 33 00 6232-66 S co CCGG 48.930 -999.990 S.. R5 2004 04 16 13 16 00 -14.2500 -170.5700 60.30 42.00 18.30 125793 SMO 2004 04 08 00 35 00 3151-99 G co CCGG 75.810 -999.990 .X. R5 2004 04 27 11 51 00 -14.2500 -170.5700 47.00 42.00 5.00 125794 SMO 2004 04 08 00 35 00 3152-99 G co CCGG 76.750 -999.990 .X. R5 2004 04 27 12 04 00 -14.2500 -170.5700 47.00 42.00 5.00 125795 SMO 2004 04 13 01 10 00 2639-99 S co CCGG 62.620 -999.990 S.. R5 2004 04 27 12 24 00 -14.2500 -170.5700 60.30 42.00 18.30 125796 SMO 2004 04 13 01 10 00 2640-99 S co CCGG 62.870 -999.990 S.. R5 2004 04 27 12 37 00 -14.2500 -170.5700 60.30 42.00 18.30 125797 SMO 2004 04 16 00 01 00 6249-66 G co CCGG 55.000 -999.990 ... R5 2004 04 27 13 42 00 -14.2500 -170.5700 47.00 42.00 5.00 125798 SMO 2004 04 16 00 01 00 6250-66 G co CCGG 55.150 -999.990 ... R5 2004 04 27 13 55 00 -14.2500 -170.5700 47.00 42.00 5.00 125799 SMO 2004 04 20 22 05 00 2491-99 G co CCGG 57.760 -999.990 ... R5 2004 05 05 17 11 00 -14.2500 -170.5700 47.00 42.00 5.00 125800 SMO 2004 04 20 22 05 00 2492-99 G co CCGG 58.120 -999.990 ... R5 2004 05 05 17 24 00 -14.2500 -170.5700 47.00 42.00 5.00 125801 SMO 2004 04 21 21 56 00 2489-99 S co CCGG 70.110 -999.990 S.. R5 2004 05 05 16 45 00 -14.2500 -170.5700 60.30 42.00 18.30 125802 SMO 2004 04 21 21 56 00 2490-99 S co CCGG 69.270 -999.990 S.. R5 2004 05 05 16 58 00 -14.2500 -170.5700 60.30 42.00 18.30 125803 SMO 2004 04 27 01 28 00 3249-99 S co CCGG 53.570 -999.990 S.. R5 2004 05 18 15 44 00 -14.2500 -170.5700 60.30 42.00 18.30 125804 SMO 2004 04 27 01 28 00 3250-99 S co CCGG 52.590 -999.990 S.. R5 2004 05 18 15 57 00 -14.2500 -170.5700 60.30 42.00 18.30 125805 SMO 2004 04 27 01 28 00 3259-99 G co CCGG 51.620 -999.990 ... R5 2004 05 19 15 21 00 -14.2500 -170.5700 47.00 42.00 5.00 125806 SMO 2004 05 04 00 50 00 3481-99 G co CCGG 52.790 -999.990 ... R5 2004 06 03 14 15 00 -14.2500 -170.5700 47.00 42.00 5.00 125807 SMO 2004 05 04 00 50 00 3482-99 G co CCGG 52.870 -999.990 ... R5 2004 06 03 14 28 00 -14.2500 -170.5700 47.00 42.00 5.00 125808 SMO 2004 05 04 01 35 00 2985-99 S co CCGG 53.130 -999.990 S.. R5 2004 05 21 10 23 00 -14.2500 -170.5700 60.30 42.00 18.30 125809 SMO 2004 05 04 01 35 00 2986-99 S co CCGG 52.740 -999.990 S.. R5 2004 05 21 10 36 00 -14.2500 -170.5700 60.30 42.00 18.30 125810 SMO 2004 05 12 22 37 00 3465-99 S co CCGG 59.700 -999.990 S.. R5 2004 06 03 14 41 00 -14.2500 -170.5700 60.30 42.00 18.30 125811 SMO 2004 05 12 22 37 00 3466-99 S co CCGG 58.080 -999.990 S.. R5 2004 06 03 14 54 00 -14.2500 -170.5700 60.30 42.00 18.30 125812 SMO 2004 05 15 00 13 00 3153-99 G co CCGG 55.120 -999.990 ... R5 2004 06 02 16 11 00 -14.2500 -170.5700 47.00 42.00 5.00 125813 SMO 2004 05 15 00 13 00 3154-99 G co CCGG 54.290 -999.990 ... R5 2004 06 02 16 24 00 -14.2500 -170.5700 47.00 42.00 5.00 125814 SMO 2004 05 18 00 43 00 2723-99 G co CCGG 53.030 -999.990 ... R5 2004 06 08 15 32 00 -14.2500 -170.5700 47.00 42.00 5.00 125815 SMO 2004 05 18 00 43 00 2724-99 G co CCGG 53.140 -999.990 ... R5 2004 06 08 15 45 00 -14.2500 -170.5700 47.00 42.00 5.00 125816 SMO 2004 05 18 01 35 00 2643-99 S co CCGG 54.820 -999.990 S.. R5 2004 06 02 15 44 00 -14.2500 -170.5700 60.30 42.00 18.30 125817 SMO 2004 05 18 01 35 00 2644-99 S co CCGG 55.600 -999.990 S.. R5 2004 06 02 15 57 00 -14.2500 -170.5700 60.30 42.00 18.30 125818 SMO 2004 05 27 22 30 00 1839-99 G co CCGG 53.200 -999.990 ... R5 2004 06 14 14 28 00 -14.2500 -170.5700 47.00 42.00 5.00 125819 SMO 2004 05 27 22 30 00 1840-99 G co CCGG 53.290 -999.990 ... R5 2004 06 14 14 41 00 -14.2500 -170.5700 47.00 42.00 5.00 125820 SMO 2004 05 28 01 08 00 2725-99 S co CCGG 51.070 -999.990 S.. R5 2004 06 08 16 00 00 -14.2500 -170.5700 60.30 42.00 18.30 125821 SMO 2004 05 28 01 08 00 2726-99 S co CCGG 51.420 -999.990 S.. R5 2004 06 08 16 13 00 -14.2500 -170.5700 60.30 42.00 18.30 125822 SMO 2004 06 03 21 50 00 2803-99 G co CCGG 56.010 -999.990 ... R5 2004 06 14 14 54 00 -14.2500 -170.5700 47.00 42.00 5.00 125823 SMO 2004 06 03 21 50 00 2804-99 G co CCGG 55.340 -999.990 ... R5 2004 06 14 15 07 00 -14.2500 -170.5700 47.00 42.00 5.00 125824 SMO 2004 06 03 22 40 00 2619-99 S co CCGG 56.180 -999.990 S.. R5 2004 06 24 09 56 00 -14.2500 -170.5700 60.30 42.00 18.30 125825 SMO 2004 06 03 22 40 00 2620-99 S co CCGG 55.740 -999.990 S.. R5 2004 06 24 10 09 00 -14.2500 -170.5700 60.30 42.00 18.30 125826 SMO 2004 06 10 00 36 00 2229-99 G co CCGG 55.240 -999.990 ... R5 2004 07 08 09 52 00 -14.2500 -170.5700 47.00 42.00 5.00 125827 SMO 2004 06 10 00 36 00 2230-99 G co CCGG 54.880 -999.990 ... R5 2004 07 08 10 05 00 -14.2500 -170.5700 47.00 42.00 5.00 125828 SMO 2004 06 10 01 05 00 6469-66 S co CCGG 56.620 -999.990 S.. R5 2004 06 24 10 22 00 -14.2500 -170.5700 60.30 42.00 18.30 125829 SMO 2004 06 10 01 05 00 6470-66 S co CCGG 56.020 -999.990 S.. R5 2004 06 24 10 35 00 -14.2500 -170.5700 60.30 42.00 18.30 125830 SMO 2004 06 16 00 10 00 2657-99 S co CCGG 60.850 -999.990 S.. R5 2004 07 08 09 26 00 -14.2500 -170.5700 60.30 42.00 18.30 125831 SMO 2004 06 16 00 10 00 2658-99 S co CCGG 60.350 -999.990 S.. R5 2004 07 08 09 39 00 -14.2500 -170.5700 60.30 42.00 18.30 125832 SMO 2004 06 16 00 48 00 3435-99 G co CCGG 57.090 -999.990 ... R5 2004 07 21 11 20 00 -14.2500 -170.5700 47.00 42.00 5.00 125833 SMO 2004 06 16 00 48 00 3436-99 G co CCGG 56.790 -999.990 ... R5 2004 07 21 11 33 00 -14.2500 -170.5700 47.00 42.00 5.00 125834 SMO 2004 06 22 22 50 00 2167-99 G co CCGG 60.260 -999.990 ... R5 2004 07 28 14 07 00 -14.2500 -170.5700 47.00 42.00 5.00 125835 SMO 2004 06 22 22 50 00 2168-99 G co CCGG 60.580 -999.990 ... R5 2004 07 28 14 20 00 -14.2500 -170.5700 47.00 42.00 5.00 125836 SMO 2004 06 22 23 59 00 3433-99 S co CCGG 402.100 -999.990 S.C R5 2004 07 21 10 02 00 -14.2500 -170.5700 60.30 42.00 18.30 125837 SMO 2004 06 22 23 59 00 3434-99 S co CCGG 402.030 -999.990 S.C R5 2004 07 21 10 15 00 -14.2500 -170.5700 60.30 42.00 18.30 125838 SMO 2004 07 02 21 24 00 6329-66 G co CCGG 62.130 -999.990 ... R5 2004 08 04 12 33 00 -14.2500 -170.5700 47.00 42.00 5.00 125839 SMO 2004 07 02 21 24 00 6330-66 G co CCGG 62.950 -999.990 ... R5 2004 08 04 12 46 00 -14.2500 -170.5700 47.00 42.00 5.00 125840 SMO 2004 07 02 23 28 00 81-99 S co CCGG 96.550 -999.990 S.. R5 2004 07 28 13 39 00 -14.2500 -170.5700 60.30 42.00 18.30 125841 SMO 2004 07 02 23 28 00 82-99 S co CCGG 96.170 -999.990 S.. R5 2004 07 28 13 52 00 -14.2500 -170.5700 60.30 42.00 18.30 125842 SMO 2004 07 06 22 02 00 6333-66 S co CCGG 79.940 -999.990 .X. R5 2004 08 04 12 07 00 -14.2500 -170.5700 60.30 42.00 18.30 125843 SMO 2004 07 06 22 02 00 6334-66 S co CCGG 79.800 -999.990 .X. R5 2004 08 04 12 20 00 -14.2500 -170.5700 60.30 42.00 18.30 125844 SMO 2004 07 06 23 25 00 3643-99 G co CCGG 61.170 -999.990 ... R5 2004 08 12 09 25 00 -14.2500 -170.5700 47.00 42.00 5.00 125845 SMO 2004 07 06 23 25 00 3644-99 G co CCGG 60.550 -999.990 ... R5 2004 08 12 09 38 00 -14.2500 -170.5700 47.00 42.00 5.00 125846 SMO 2004 07 14 00 10 00 3645-99 S co CCGG 66.870 -999.990 S.. R5 2004 08 12 09 51 00 -14.2500 -170.5700 60.30 42.00 18.30 125847 SMO 2004 07 14 00 10 00 3646-99 S co CCGG 66.320 -999.990 S.. R5 2004 08 12 10 04 00 -14.2500 -170.5700 60.30 42.00 18.30 125848 SMO 2004 07 14 00 30 00 2309-99 G co CCGG 59.210 -999.990 ... R5 2004 08 16 12 24 00 -14.2500 -170.5700 47.00 42.00 5.00 125849 SMO 2004 07 20 00 39 00 3863-99 G co CCGG 62.080 -999.990 ... R5 2004 08 16 09 56 00 -14.2500 -170.5700 47.00 42.00 5.00 125850 SMO 2004 07 20 00 39 00 3864-99 G co CCGG 62.730 -999.990 ... R5 2004 08 16 10 09 00 -14.2500 -170.5700 47.00 42.00 5.00 125851 SMO 2004 07 20 01 40 00 2299-99 S co CCGG 65.340 -999.990 S.. R5 2004 08 23 13 55 00 -14.2500 -170.5700 60.30 42.00 18.30 125852 SMO 2004 07 20 01 40 00 2300-99 S co CCGG 65.590 -999.990 S.. R5 2004 08 23 14 08 00 -14.2500 -170.5700 60.30 42.00 18.30 125853 SMO 2004 07 28 02 07 00 3851-99 S co CCGG 58.370 -999.990 S.. R5 2004 08 23 13 25 00 -14.2500 -170.5700 60.30 42.00 18.30 125854 SMO 2004 07 28 02 07 00 3852-99 S co CCGG 56.280 -999.990 S.. R5 2004 08 23 13 38 00 -14.2500 -170.5700 60.30 42.00 18.30 125855 SMO 2004 07 28 02 30 00 2143-99 G co CCGG 58.060 -999.990 ... R5 2004 08 26 14 06 00 -14.2500 -170.5700 47.00 42.00 5.00 125856 SMO 2004 07 28 02 30 00 2144-99 G co CCGG 57.470 -999.990 ... R5 2004 08 26 14 19 00 -14.2500 -170.5700 47.00 42.00 5.00 125857 SMO 2004 08 05 02 32 00 2313-99 S co CCGG 63.640 -999.990 S.. R5 2004 08 26 14 32 00 -14.2500 -170.5700 60.30 42.00 18.30 125858 SMO 2004 08 05 02 32 00 2314-99 S co CCGG 63.370 -999.990 S.. R5 2004 08 26 14 45 00 -14.2500 -170.5700 60.30 42.00 18.30 125859 SMO 2004 08 05 02 50 00 2477-99 G co CCGG 63.640 -999.990 ... R5 2004 08 27 12 08 00 -14.2500 -170.5700 47.00 42.00 5.00 125860 SMO 2004 08 05 02 50 00 2478-99 G co CCGG 62.650 -999.990 ... R5 2004 08 27 12 21 00 -14.2500 -170.5700 47.00 42.00 5.00 125861 SMO 2004 08 09 23 10 00 2861-99 S co CCGG 59.730 -999.990 S.. R5 2004 08 27 11 42 00 -14.2500 -170.5700 60.30 42.00 18.30 125862 SMO 2004 08 09 23 10 00 2862-99 S co CCGG 60.010 -999.990 S.. R5 2004 08 27 11 55 00 -14.2500 -170.5700 60.30 42.00 18.30 125863 SMO 2004 08 10 00 17 00 1305-99 G co CCGG 59.020 -999.990 ... R5 2004 09 16 12 38 00 -14.2300 -170.5600 47.00 42.00 5.00 188520 SMO 2004 08 10 00 17 00 1306-99 G co CCGG 60.050 -999.990 ... R5 2004 09 16 12 52 00 -14.2300 -170.5600 47.00 42.00 5.00 188521 SMO 2004 08 17 00 10 00 1675-99 S co CCGG 61.230 -999.990 S.. R5 2004 09 16 12 10 00 -14.2300 -170.5600 60.30 42.00 18.30 188518 SMO 2004 08 17 00 10 00 1676-99 S co CCGG 59.800 -999.990 S.. R5 2004 09 16 12 24 00 -14.2300 -170.5600 60.30 42.00 18.30 188519 SMO 2004 08 17 00 30 00 1779-99 G co CCGG 59.070 -999.990 ... R5 2004 09 20 16 32 00 -14.2300 -170.5600 47.00 42.00 5.00 188983 SMO 2004 08 17 00 30 00 1780-99 G co CCGG 59.080 -999.990 ... R5 2004 09 20 16 47 00 -14.2300 -170.5600 47.00 42.00 5.00 188984 SMO 2004 08 23 21 58 00 1745-99 S co CCGG 59.340 -999.990 S.. R5 2004 09 20 16 04 00 -14.2300 -170.5600 60.30 42.00 18.30 188981 SMO 2004 08 23 21 58 00 1746-99 S co CCGG 59.340 -999.990 S.. R5 2004 09 20 16 18 00 -14.2300 -170.5600 60.30 42.00 18.30 188982 SMO 2004 08 23 22 58 00 6465-66 G co CCGG 59.580 -999.990 ... R5 2004 10 04 14 14 00 -14.2300 -170.5600 47.00 42.00 5.00 189310 SMO 2004 08 23 22 58 00 6466-66 G co CCGG 59.460 -999.990 ... R5 2004 10 04 14 28 00 -14.2300 -170.5600 47.00 42.00 5.00 189311 SMO 2004 09 02 22 39 00 2903-99 G co CCGG 72.140 -999.990 ... R5 2004 10 04 14 42 00 -14.2300 -170.5600 47.00 42.00 5.00 189294 SMO 2004 09 02 22 39 00 2904-99 G co CCGG 72.490 -999.990 ... R5 2004 10 04 14 56 00 -14.2300 -170.5600 47.00 42.00 5.00 189295 SMO 2004 09 02 23 20 00 1389-99 S co CCGG 74.790 -999.990 S.. R5 2004 10 04 13 45 00 -14.2300 -170.5600 60.30 42.00 18.30 189280 SMO 2004 09 02 23 20 00 1390-99 S co CCGG 74.350 -999.990 S.. R5 2004 10 04 14 00 00 -14.2300 -170.5600 60.30 42.00 18.30 189281 SMO 2004 09 07 21 12 00 3229-99 G co CCGG 70.160 -999.990 ... R5 2004 10 12 13 04 00 -14.2300 -170.5600 47.00 42.00 5.00 189659 SMO 2004 09 07 21 12 00 3230-99 G co CCGG 69.710 -999.990 ... R5 2004 10 12 13 18 00 -14.2300 -170.5600 47.00 42.00 5.00 189660 SMO 2004 09 07 22 05 00 3019-99 S co CCGG 68.760 -999.990 S.. R5 2004 10 04 13 17 00 -14.2300 -170.5600 60.30 42.00 18.30 189296 SMO 2004 09 07 22 05 00 3020-99 S co CCGG 71.240 -999.990 S.. R5 2004 10 04 13 31 00 -14.2300 -170.5600 60.30 42.00 18.30 189297 SMO 2004 09 13 22 15 00 3379-99 G co CCGG 62.660 -999.990 ... R5 2004 10 08 15 10 00 -14.2300 -170.5600 47.00 42.00 5.00 189811 SMO 2004 09 13 22 15 00 3380-99 G co CCGG 62.340 -999.990 ... R5 2004 10 08 15 24 00 -14.2300 -170.5600 47.00 42.00 5.00 189812 SMO 2004 09 13 23 38 00 265-99 S co CCGG 64.200 -999.990 S.. R5 2004 10 12 13 32 00 -14.2300 -170.5600 60.30 42.00 18.30 189657 SMO 2004 09 13 23 38 00 266-99 S co CCGG 63.380 -999.990 S.. R5 2004 10 12 13 47 00 -14.2300 -170.5600 60.30 42.00 18.30 189658 SMO 2004 09 21 22 18 00 3241-99 G co CCGG 70.060 -999.990 ... R5 2004 10 19 15 46 00 -14.2300 -170.5600 47.00 42.00 5.00 190299 SMO 2004 09 21 22 18 00 3242-99 G co CCGG 68.790 -999.990 ... R5 2004 10 19 16 00 00 -14.2300 -170.5600 47.00 42.00 5.00 190300 SMO 2004 09 21 23 08 00 173-99 S co CCGG 72.560 -999.990 S.. R5 2004 10 08 14 41 00 -14.2300 -170.5600 60.30 42.00 18.30 189809 SMO 2004 09 21 23 08 00 174-99 S co CCGG 72.680 -999.990 S.. R5 2004 10 08 14 56 00 -14.2300 -170.5600 60.30 42.00 18.30 189810 SMO 2004 09 29 00 29 00 1613-99 G co CCGG 68.010 -999.990 ... R5 2004 10 19 15 17 00 -14.2300 -170.5600 47.00 42.00 5.00 190297 SMO 2004 09 29 00 29 00 1614-99 G co CCGG 67.090 -999.990 ... R5 2004 10 19 15 31 00 -14.2300 -170.5600 47.00 42.00 5.00 190298 SMO 2004 09 29 02 40 00 2319-99 S co CCGG 70.150 -999.990 S.. R5 2004 11 01 17 07 00 -14.2300 -170.5600 60.30 42.00 18.30 190673 SMO 2004 09 29 02 40 00 2320-99 S co CCGG 69.410 -999.990 S.. R5 2004 11 01 17 21 00 -14.2300 -170.5600 60.30 42.00 18.30 190674 SMO 2004 10 05 03 22 00 955-99 G co CCGG 61.800 -999.990 ... R5 2004 10 29 10 48 00 -14.2300 -170.5600 47.00 42.00 5.00 190814 SMO 2004 10 05 03 22 00 956-99 G co CCGG 61.290 -999.990 ... R5 2004 10 29 11 02 00 -14.2300 -170.5600 47.00 42.00 5.00 190815 SMO 2004 10 05 04 05 00 3987-99 S co CCGG 61.520 -999.990 S.. R5 2004 11 01 16 38 00 -14.2300 -170.5600 60.30 42.00 18.30 190671 SMO 2004 10 05 04 05 00 3988-99 S co CCGG 61.790 -999.990 S.. R5 2004 11 01 16 53 00 -14.2300 -170.5600 60.30 42.00 18.30 190672 SMO 2004 10 12 02 00 00 2069-99 G co CCGG 69.120 -999.990 ... R5 2004 11 08 09 09 00 -14.2300 -170.5600 47.00 42.00 5.00 191242 SMO 2004 10 12 02 00 00 2070-99 G co CCGG 67.850 -999.990 ... R5 2004 11 08 09 23 00 -14.2300 -170.5600 47.00 42.00 5.00 191243 SMO 2004 10 12 02 28 00 3405-99 S co CCGG 69.970 -999.990 S.. R5 2004 10 29 12 16 00 -14.2300 -170.5600 60.30 42.00 18.30 190816 SMO 2004 10 12 02 28 00 3406-99 S co CCGG 68.400 -999.990 S.. R5 2004 10 29 12 30 00 -14.2300 -170.5600 60.30 42.00 18.30 190817 SMO 2004 10 18 23 00 00 165-99 G co CCGG 77.950 -999.990 ... R5 2004 11 10 16 18 00 -14.2300 -170.5600 47.00 42.00 5.00 191593 SMO 2004 10 18 23 00 00 166-99 G co CCGG 77.380 -999.990 ... R5 2004 11 10 16 32 00 -14.2300 -170.5600 47.00 42.00 5.00 191594 SMO 2004 10 18 23 32 00 3703-99 S co CCGG 76.860 -999.990 S.. R5 2004 11 05 14 24 00 -14.2300 -170.5600 60.30 42.00 18.30 191244 SMO 2004 10 18 23 32 00 3704-99 S co CCGG 76.280 -999.990 S.. R5 2004 11 05 14 38 00 -14.2300 -170.5600 60.30 42.00 18.30 191245 SMO 2004 10 25 22 00 00 6445-66 G co CCGG 73.290 -999.990 ... R5 2004 11 16 18 16 00 -14.2300 -170.5600 47.00 42.00 5.00 191772 SMO 2004 10 25 22 00 00 6446-66 G co CCGG 76.490 -999.990 ... R5 2004 11 16 18 30 00 -14.2300 -170.5600 47.00 42.00 5.00 191773 SMO 2004 10 25 22 53 00 1333-99 S co CCGG 75.080 -999.990 S.. R5 2004 11 10 15 50 00 -14.2300 -170.5600 60.30 42.00 18.30 191591 SMO 2004 10 25 22 53 00 1334-99 S co CCGG 74.540 -999.990 S.. R5 2004 11 10 16 04 00 -14.2300 -170.5600 60.30 42.00 18.30 191592 SMO 2004 11 03 22 10 00 2867-99 G co CCGG 79.600 -999.990 ... R5 2004 11 16 21 34 00 -14.2300 -170.5600 47.00 42.00 5.00 191744 SMO 2004 11 03 22 10 00 2868-99 G co CCGG 79.100 -999.990 ... R5 2004 11 16 21 48 00 -14.2300 -170.5600 47.00 42.00 5.00 191745 SMO 2004 11 03 23 05 00 3263-99 S co CCGG 83.060 -999.990 S.. R5 2004 11 17 08 45 00 -14.2300 -170.5600 60.30 42.00 18.30 191746 SMO 2004 11 03 23 05 00 3264-99 S co CCGG 82.930 -999.990 S.. R5 2004 11 17 08 59 00 -14.2300 -170.5600 60.30 42.00 18.30 191747 SMO 2004 11 09 20 36 00 2575-99 G co CCGG 71.400 -999.990 ... R5 2004 12 13 13 39 00 -14.2300 -170.5600 47.00 42.00 5.00 192867 SMO 2004 11 09 20 36 00 2576-99 G co CCGG 65.690 -999.990 ... R5 2004 12 13 13 53 00 -14.2300 -170.5600 47.00 42.00 5.00 192868 SMO 2004 11 09 21 40 00 1811-99 S co CCGG 68.020 -999.990 S.. R5 2004 12 13 12 43 00 -14.2300 -170.5600 60.30 42.00 18.30 192866 SMO 2004 11 09 21 40 00 1812-99 S co CCGG 66.650 -999.990 S.. R5 2004 12 13 12 57 00 -14.2300 -170.5600 60.30 42.00 18.30 192865 SMO 2004 11 16 20 50 00 2385-99 G co CCGG 70.210 -999.990 ... R5 2004 12 06 14 28 00 -14.2300 -170.5600 47.00 42.00 5.00 192332 SMO 2004 11 16 20 50 00 2386-99 G co CCGG 70.240 -999.990 ... R5 2004 12 06 14 42 00 -14.2300 -170.5600 47.00 42.00 5.00 192333 SMO 2004 11 16 21 31 00 3775-99 S co CCGG 70.940 -999.990 S.. R5 2004 12 06 14 00 00 -14.2300 -170.5600 60.30 42.00 18.30 192336 SMO 2004 11 16 21 31 00 3776-99 S co CCGG 70.330 -999.990 S.. R5 2004 12 06 14 14 00 -14.2300 -170.5600 60.30 42.00 18.30 192337 SMO 2004 11 26 02 32 00 2199-99 S co CCGG 65.580 -999.990 S.. R5 2004 12 15 09 18 00 -14.2300 -170.5600 60.30 42.00 18.30 192919 SMO 2004 11 26 02 32 00 2200-99 S co CCGG 64.760 -999.990 S.. R5 2004 12 15 09 32 00 -14.2300 -170.5600 60.30 42.00 18.30 192920 SMO 2004 11 30 23 40 00 3889-99 S co CCGG 65.850 -999.990 S.. R5 2005 01 05 10 11 00 -14.2300 -170.5600 60.30 42.00 18.30 193246 SMO 2004 11 30 23 40 00 3890-99 S co CCGG 65.510 -999.990 S.. R5 2005 01 05 10 25 00 -14.2300 -170.5600 60.30 42.00 18.30 193247 SMO 2004 12 01 00 03 00 2521-99 G co CCGG 62.700 -999.990 ... R5 2004 12 15 09 47 00 -14.2300 -170.5600 47.00 42.00 5.00 192921 SMO 2004 12 01 00 03 00 2522-99 G co CCGG 63.580 -999.990 ... R5 2004 12 15 10 01 00 -14.2300 -170.5600 47.00 42.00 5.00 192922 SMO 2004 12 09 00 40 00 3749-99 G co CCGG 63.770 -999.990 ... R5 2005 01 05 09 15 00 -14.2300 -170.5600 47.00 42.00 5.00 193244 SMO 2004 12 09 00 40 00 3750-99 G co CCGG 63.260 -999.990 ... R5 2005 01 05 09 29 00 -14.2300 -170.5600 47.00 42.00 5.00 193245 SMO 2004 12 09 01 30 00 587-99 S co CCGG 63.430 -999.990 S.. R5 2005 01 06 12 33 00 -14.2300 -170.5600 60.30 42.00 18.30 193565 SMO 2004 12 09 01 30 00 588-99 S co CCGG 62.510 -999.990 S.. R5 2005 01 06 12 48 00 -14.2300 -170.5600 60.30 42.00 18.30 193566 SMO 2004 12 14 23 01 00 2421-99 G co CCGG 58.750 -999.990 ... R5 2005 01 07 11 45 00 -14.2300 -170.5600 47.00 42.00 5.00 193635 SMO 2004 12 14 23 01 00 2422-99 G co CCGG 58.290 -999.990 ... R5 2005 01 07 11 59 00 -14.2300 -170.5600 47.00 42.00 5.00 193636 SMO 2004 12 14 23 40 00 3783-99 S co CCGG 59.930 -999.990 S.. R5 2005 01 06 14 26 00 -14.2300 -170.5600 60.30 42.00 18.30 193563 SMO 2004 12 14 23 40 00 3784-99 S co CCGG 59.190 -999.990 S.. R5 2005 01 06 14 40 00 -14.2300 -170.5600 60.30 42.00 18.30 193564 SMO 2004 12 23 01 30 00 1569-99 S co CCGG 58.670 -999.990 S.. R5 2005 01 14 11 38 00 -14.2300 -170.5600 60.30 42.00 18.30 193828 SMO 2004 12 23 01 30 00 1570-99 S co CCGG 57.370 -999.990 S.. R5 2005 01 14 11 52 00 -14.2300 -170.5600 60.30 42.00 18.30 193829 SMO 2004 12 23 01 42 00 955-99 G co CCGG 57.220 -999.990 ... R5 2005 01 07 12 13 00 -14.2300 -170.5600 47.00 42.00 5.00 193637 SMO 2004 12 23 01 42 00 956-99 G co CCGG 56.250 -999.990 ... R5 2005 01 07 12 28 00 -14.2300 -170.5600 47.00 42.00 5.00 193638 SMO 2004 12 28 22 45 00 4187-99 G co CCGG 56.010 -999.990 ... R5 2005 01 19 16 19 00 -14.2300 -170.5600 47.00 42.00 5.00 194079 SMO 2004 12 28 22 45 00 4188-99 G co CCGG 55.800 -999.990 ... R5 2005 01 19 16 33 00 -14.2300 -170.5600 47.00 42.00 5.00 194080 SMO 2004 12 28 23 38 00 2313-99 S co CCGG 57.410 -999.990 S.. R5 2005 01 14 11 09 00 -14.2300 -170.5600 60.30 42.00 18.30 193830 SMO 2004 12 28 23 38 00 2314-99 S co CCGG 57.270 -999.990 S.. R5 2005 01 14 11 23 00 -14.2300 -170.5600 60.30 42.00 18.30 193831 SMO 2005 01 05 00 35 00 3831-99 G co CCGG 62.370 -999.990 ... R5 2005 01 19 15 51 00 -14.2300 -170.5600 47.00 42.00 5.00 194077 SMO 2005 01 05 00 35 00 3832-99 G co CCGG 61.840 -999.990 ... R5 2005 01 19 16 05 00 -14.2300 -170.5600 47.00 42.00 5.00 194078 SMO 2005 01 05 01 05 00 1999-99 S co CCGG 62.780 -999.990 S.. R5 2005 01 31 11 41 00 -14.2300 -170.5600 60.30 42.00 18.30 194525 SMO 2005 01 05 01 05 00 2000-99 S co CCGG 61.540 -999.990 S.. R5 2005 01 31 11 55 00 -14.2300 -170.5600 60.30 42.00 18.30 194526 SMO 2005 01 12 22 57 00 4169-99 G co CCGG 53.830 -999.990 ... R5 2005 02 09 10 18 00 -14.2300 -170.5600 47.00 42.00 5.00 194739 SMO 2005 01 12 22 57 00 4170-99 G co CCGG 46.710 -999.990 ... R5 2005 02 09 10 32 00 -14.2300 -170.5600 47.00 42.00 5.00 194740 SMO 2005 01 12 23 29 00 1673-99 S co CCGG 52.550 -999.990 S.. R5 2005 01 31 10 16 00 -14.2300 -170.5600 60.30 42.00 18.30 194523 SMO 2005 01 12 23 29 00 1674-99 S co CCGG 53.050 -999.990 S.. R5 2005 01 31 10 30 00 -14.2300 -170.5600 60.30 42.00 18.30 194524 SMO 2005 01 20 21 40 00 2559-99 G co CCGG 56.720 -999.990 ... R5 2005 02 11 14 00 00 -14.2300 -170.5600 47.00 42.00 5.00 194965 SMO 2005 01 20 21 40 00 2560-99 G co CCGG 57.770 -999.990 ... R5 2005 02 11 14 14 00 -14.2300 -170.5600 47.00 42.00 5.00 194966 SMO 2005 01 20 22 06 00 213-99 S co CCGG 56.140 -999.990 S.. R5 2005 02 09 11 42 00 -14.2300 -170.5600 60.30 42.00 18.30 194737 SMO 2005 01 20 22 06 00 214-99 S co CCGG 57.370 -999.990 S.. R5 2005 02 09 11 57 00 -14.2300 -170.5600 60.30 42.00 18.30 194738 SMO 2005 01 27 22 45 00 3253-99 G co CCGG 49.750 -999.990 ... R5 2005 02 14 13 54 00 -14.2300 -170.5600 47.00 42.00 5.00 194977 SMO 2005 01 27 22 45 00 3254-99 G co CCGG 50.370 -999.990 ... R5 2005 02 14 14 09 00 -14.2300 -170.5600 47.00 42.00 5.00 194978 SMO 2005 01 27 23 15 00 1421-99 S co CCGG 49.400 -999.990 S.. R5 2005 02 14 14 23 00 -14.2300 -170.5600 60.30 42.00 18.30 194975 SMO 2005 01 27 23 15 00 1422-99 S co CCGG 49.000 -999.990 S.. R5 2005 02 14 14 37 00 -14.2300 -170.5600 60.30 42.00 18.30 194976 SMO 2005 02 05 00 21 00 3821-99 S co CCGG 64.050 -999.990 S.. R5 2005 02 22 12 26 00 -14.2300 -170.5600 60.30 42.00 18.30 195335 SMO 2005 02 05 00 21 00 3822-99 S co CCGG 63.270 -999.990 S.. R5 2005 02 22 12 40 00 -14.2300 -170.5600 60.30 42.00 18.30 195334 SMO 2005 02 05 00 35 00 3063-99 G co CCGG 66.100 -999.990 ... R5 2005 02 22 11 58 00 -14.2300 -170.5600 47.00 42.00 5.00 195332 SMO 2005 02 05 00 35 00 3064-99 G co CCGG 66.820 -999.990 ... R5 2005 02 22 12 12 00 -14.2300 -170.5600 47.00 42.00 5.00 195333 SMO 2005 02 10 21 35 00 2771-99 G co CCGG 53.540 -999.990 ... R5 2005 02 22 09 09 00 -14.2300 -170.5600 47.00 42.00 5.00 195304 SMO 2005 02 10 21 35 00 2772-99 G co CCGG 53.020 -999.990 ... R5 2005 02 22 09 23 00 -14.2300 -170.5600 47.00 42.00 5.00 195305 SMO 2005 02 10 22 36 00 55-99 S co CCGG 53.020 -999.990 S.. R5 2005 02 22 09 37 00 -14.2300 -170.5600 60.30 42.00 18.30 195306 SMO 2005 02 10 22 36 00 56-99 S co CCGG 52.180 -999.990 S.. R5 2005 02 22 09 51 00 -14.2300 -170.5600 60.30 42.00 18.30 195307 SMO 2005 02 19 01 36 00 2529-99 S co CCGG 52.310 -999.990 S.. R5 2005 03 11 11 10 00 -14.2300 -170.5600 60.30 42.00 18.30 196326 SMO 2005 02 19 01 36 00 2530-99 S co CCGG 53.310 -999.990 S.. R5 2005 03 11 11 24 00 -14.2300 -170.5600 60.30 42.00 18.30 196327 SMO 2005 02 24 21 45 00 2543-99 G co CCGG 48.850 -999.990 ... R5 2005 03 11 11 38 00 -14.2300 -170.5600 47.00 42.00 5.00 196324 SMO 2005 02 24 21 45 00 2544-99 G co CCGG 48.440 -999.990 ... R5 2005 03 11 11 52 00 -14.2300 -170.5600 47.00 42.00 5.00 196325 SMO 2005 03 04 22 12 00 511-99 G co CCGG 59.490 -999.990 ... R5 2005 03 24 13 54 00 -14.2300 -170.5600 47.00 42.00 5.00 196757 SMO 2005 03 04 22 12 00 512-99 G co CCGG 59.030 -999.990 ... R5 2005 03 24 14 09 00 -14.2300 -170.5600 47.00 42.00 5.00 196758 SMO 2005 03 04 23 11 00 3687-99 S co CCGG 55.810 -999.990 S.. R5 2005 03 24 13 26 00 -14.2300 -170.5600 60.30 42.00 18.30 196759 SMO 2005 03 04 23 11 00 3688-99 S co CCGG 54.710 -999.990 S.. R5 2005 03 24 13 40 00 -14.2300 -170.5600 60.30 42.00 18.30 196760 SMO 2005 03 10 19 52 00 2613-99 G co CCGG 68.220 -999.990 ... R5 2005 03 24 14 23 00 -14.2300 -170.5600 47.00 42.00 5.00 196761 SMO 2005 03 10 19 52 00 2614-99 G co CCGG 67.580 -999.990 ... R5 2005 03 24 14 37 00 -14.2300 -170.5600 47.00 42.00 5.00 196762 SMO 2005 03 10 21 28 00 3235-99 S co CCGG 65.280 -999.990 S.. R5 2005 03 24 14 51 00 -14.2300 -170.5600 60.30 42.00 18.30 196763 SMO 2005 03 10 21 28 00 3236-99 S co CCGG 65.770 -999.990 S.. R5 2005 03 24 15 05 00 -14.2300 -170.5600 60.30 42.00 18.30 196764 SMO 2005 03 16 22 05 00 1233-99 G co CCGG 64.350 -999.990 ... R5 2005 03 29 10 38 00 -14.2300 -170.5600 47.00 42.00 5.00 197040 SMO 2005 03 16 22 05 00 1234-99 G co CCGG 63.780 -999.990 ... R5 2005 03 29 10 52 00 -14.2300 -170.5600 47.00 42.00 5.00 197041 SMO 2005 03 16 23 55 00 6497-66 S co CCGG 61.660 -999.990 S.. R5 2005 03 29 11 06 00 -14.2300 -170.5600 60.30 42.00 18.30 197042 SMO 2005 03 16 23 55 00 6498-66 S co CCGG 61.710 -999.990 S.. R5 2005 03 29 11 20 00 -14.2300 -170.5600 60.30 42.00 18.30 197043 SMO 2005 03 21 20 03 00 4181-99 G co CCGG 55.250 -999.990 ... R5 2005 04 05 13 40 00 -14.2300 -170.5600 47.00 42.00 5.00 197281 SMO 2005 03 21 20 03 00 4182-99 G co CCGG 54.360 -999.990 ... R5 2005 04 05 13 55 00 -14.2300 -170.5600 47.00 42.00 5.00 197282 SMO 2005 03 21 21 11 00 2379-99 S co CCGG 52.130 -999.990 S.. R5 2005 04 05 13 12 00 -14.2300 -170.5600 60.30 42.00 18.30 197279 SMO 2005 03 21 21 11 00 2380-99 S co CCGG 51.520 -999.990 S.. R5 2005 04 05 13 26 00 -14.2300 -170.5600 60.30 42.00 18.30 197280 SMO 2005 03 28 22 06 00 1969-99 G co CCGG 59.920 -999.990 ... R5 2005 04 13 13 10 00 -14.2300 -170.5600 47.00 42.00 5.00 197517 SMO 2005 03 28 22 06 00 1970-99 G co CCGG 59.900 -999.990 ... R5 2005 04 13 13 24 00 -14.2300 -170.5600 47.00 42.00 5.00 197518 SMO 2005 03 28 22 55 00 2385-99 S co CCGG 57.540 -999.990 S.. R5 2005 04 13 14 06 00 -14.2300 -170.5600 60.30 42.00 18.30 197519 SMO 2005 03 28 22 55 00 2386-99 S co CCGG 58.750 -999.990 S.. R5 2005 04 13 14 20 00 -14.2300 -170.5600 60.30 42.00 18.30 197520 SMO 2005 04 04 23 06 00 6701-66 S co CCGG 48.890 -999.990 S.. R5 2005 04 26 11 10 00 -14.2300 -170.5600 60.30 42.00 18.30 197839 SMO 2005 04 04 23 06 00 6702-66 S co CCGG 47.880 -999.990 S.. R5 2005 04 26 11 24 00 -14.2300 -170.5600 60.30 42.00 18.30 197840 SMO 2005 04 04 23 21 00 59-99 G co CCGG 50.250 -999.990 ... R5 2005 04 26 10 42 00 -14.2300 -170.5600 47.00 42.00 5.00 197837 SMO 2005 04 04 23 21 00 60-99 G co CCGG 50.410 -999.990 ... R5 2005 04 26 10 56 00 -14.2300 -170.5600 47.00 42.00 5.00 197838 SMO 2005 04 11 21 24 00 2453-99 S co CCGG 61.840 -999.990 S.. R5 2005 04 27 09 40 00 -14.2300 -170.5600 60.30 42.00 18.30 197996 SMO 2005 04 11 21 24 00 2454-99 S co CCGG 61.280 -999.990 S.. R5 2005 04 27 09 54 00 -14.2300 -170.5600 60.30 42.00 18.30 197997 SMO 2005 04 11 23 09 00 2987-99 G co CCGG 64.920 -999.990 ... R5 2005 04 27 09 12 00 -14.2300 -170.5600 47.00 42.00 5.00 197994 SMO 2005 04 11 23 09 00 2988-99 G co CCGG 63.930 -999.990 ... R5 2005 04 27 09 26 00 -14.2300 -170.5600 47.00 42.00 5.00 197995 SMO 2005 04 20 22 10 00 1971-99 G co CCGG 72.230 -999.990 ... R5 2005 05 04 08 37 00 -14.2300 -170.5600 47.00 42.00 5.00 198362 SMO 2005 04 20 22 10 00 1972-99 G co CCGG 71.200 -999.990 ... R5 2005 05 04 08 51 00 -14.2300 -170.5600 47.00 42.00 5.00 198363 SMO 2005 04 20 22 50 00 6037-66 S co CCGG 69.470 -999.990 S.. R5 2005 05 04 09 06 00 -14.2300 -170.5600 60.30 42.00 18.30 198364 SMO 2005 04 20 22 50 00 6038-66 S co CCGG 69.760 -999.990 S.. R5 2005 05 04 09 20 00 -14.2300 -170.5600 60.30 42.00 18.30 198365 SMO 2005 04 28 00 15 00 1569-99 G co CCGG 69.810 -999.990 ... R5 2005 05 18 14 30 00 -14.2300 -170.5600 47.00 42.00 5.00 198719 SMO 2005 04 28 00 15 00 1570-99 G co CCGG 69.600 -999.990 ... R5 2005 05 18 14 44 00 -14.2300 -170.5600 47.00 42.00 5.00 198720 SMO 2005 04 28 00 33 00 3831-99 S co CCGG 67.020 -999.990 S.. R5 2005 05 18 14 02 00 -14.2300 -170.5600 60.30 42.00 18.30 198721 SMO 2005 04 28 00 33 00 3832-99 S co CCGG 67.810 -999.990 S.. R5 2005 05 18 14 16 00 -14.2300 -170.5600 60.30 42.00 18.30 198722 SMO 2005 05 03 21 50 00 1629-99 G co CCGG 54.600 -999.990 ... R5 2005 05 25 10 10 00 -14.2300 -170.5600 47.00 42.00 5.00 199099 SMO 2005 05 03 21 50 00 1630-99 G co CCGG 54.410 -999.990 ... R5 2005 05 25 10 24 00 -14.2300 -170.5600 47.00 42.00 5.00 199100 SMO 2005 05 03 22 31 00 2585-99 S co CCGG 53.520 -999.990 S.. R5 2005 05 25 09 14 00 -14.2300 -170.5600 60.30 42.00 18.30 199101 SMO 2005 05 03 22 31 00 2586-99 S co CCGG 52.010 -999.990 S.. R5 2005 05 25 09 28 00 -14.2300 -170.5600 60.30 42.00 18.30 199102 SMO 2005 05 12 22 10 00 1335-99 G co CCGG 70.220 -999.990 ... R5 2005 06 06 09 45 00 -14.2300 -170.5600 47.00 42.00 5.00 199359 SMO 2005 05 12 22 10 00 1336-99 G co CCGG 69.240 -999.990 ... R5 2005 06 06 09 59 00 -14.2300 -170.5600 47.00 42.00 5.00 199360 SMO 2005 05 12 22 37 00 2119-99 S co CCGG 66.310 -999.990 S.. R5 2005 06 03 15 59 00 -14.2300 -170.5600 60.30 42.00 18.30 199361 SMO 2005 05 12 22 37 00 2120-99 S co CCGG 65.740 -999.990 S.. R5 2005 06 03 16 13 00 -14.2300 -170.5600 60.30 42.00 18.30 199362 SMO 2005 05 17 22 40 00 4149-99 G co CCGG 57.860 -999.990 ... R5 2005 06 16 11 24 00 -14.2300 -170.5600 47.00 42.00 5.00 199995 SMO 2005 05 17 22 40 00 4150-99 G co CCGG 57.450 -999.990 ..< R5 2005 06 16 11 38 00 -14.2300 -170.5600 47.00 42.00 5.00 199996 SMO 2005 05 17 23 39 00 6521-66 S co CCGG 55.540 -999.990 S.. R5 2005 06 16 10 55 00 -14.2300 -170.5600 60.30 42.00 18.30 199997 SMO 2005 05 17 23 39 00 6522-66 S co CCGG 55.200 -999.990 S.. R5 2005 06 16 11 09 00 -14.2300 -170.5600 60.30 42.00 18.30 199998 SMO 2005 05 23 00 00 00 55-99 S co CCGG 52.410 -999.990 S.. R5 2005 06 20 12 28 00 -14.2300 -170.5600 60.30 42.00 18.30 200273 SMO 2005 05 23 00 00 00 56-99 S co CCGG 52.250 -999.990 S.. R5 2005 06 20 12 42 00 -14.2300 -170.5600 60.30 42.00 18.30 200274 SMO 2005 05 23 22 20 00 2771-99 G co CCGG 55.320 -999.990 ... R5 2005 06 20 12 56 00 -14.2300 -170.5600 47.00 42.00 5.00 200271 SMO 2005 05 23 22 20 00 2772-99 G co CCGG 55.210 -999.990 ... R5 2005 06 20 13 11 00 -14.2300 -170.5600 47.00 42.00 5.00 200272 SMO 2005 06 01 23 21 00 3977-99 G co CCGG 58.610 -999.990 ... R5 2005 06 24 11 46 00 -14.2300 -170.5600 47.00 42.00 5.00 200593 SMO 2005 06 01 23 21 00 3978-99 G co CCGG 58.490 -999.990 ... R5 2005 06 24 12 01 00 -14.2300 -170.5600 47.00 42.00 5.00 200594 SMO 2005 06 01 23 37 00 3491-99 S co CCGG 56.270 -999.990 S.. R5 2005 06 24 12 15 00 -14.2300 -170.5600 60.30 42.00 18.30 200596 SMO 2005 06 01 23 37 00 3492-99 S co CCGG 56.220 -999.990 S.. R5 2005 06 24 12 29 00 -14.2300 -170.5600 60.30 42.00 18.30 200595 SMO 2005 06 07 19 19 00 3579-99 G co CCGG 58.180 -999.990 ... R5 2005 07 08 14 36 00 -14.2300 -170.5600 47.00 42.00 5.00 201136 SMO 2005 06 07 19 19 00 3580-99 G co CCGG 58.060 -999.990 ... R5 2005 07 08 14 50 00 -14.2300 -170.5600 47.00 42.00 5.00 201137 SMO 2005 06 07 19 48 00 1945-99 S co CCGG 57.900 -999.990 S.. R5 2005 07 08 14 08 00 -14.2300 -170.5600 60.30 42.00 18.30 201134 SMO 2005 06 07 19 48 00 1946-99 S co CCGG 57.160 -999.990 S.. R5 2005 07 08 14 22 00 -14.2300 -170.5600 60.30 42.00 18.30 201135 SMO 2005 06 17 19 57 00 555-99 G co CCGG 60.850 -999.990 ... R5 2005 07 15 14 44 00 -14.2300 -170.5600 47.00 42.00 5.00 201578 SMO 2005 06 17 19 57 00 556-99 G co CCGG 61.370 -999.990 ... R5 2005 07 15 14 58 00 -14.2300 -170.5600 47.00 42.00 5.00 201579 SMO 2005 06 17 20 39 00 6063-66 S co CCGG 58.760 -999.990 S.. R5 2005 07 15 14 16 00 -14.2300 -170.5600 60.30 42.00 18.30 201580 SMO 2005 06 17 20 39 00 6064-66 S co CCGG 58.590 -999.990 S.. R5 2005 07 15 14 30 00 -14.2300 -170.5600 60.30 42.00 18.30 201581 SMO 2005 06 20 20 12 00 317-99 G co CCGG 58.840 -999.990 ... R5 2005 07 21 08 36 00 -14.2300 -170.5600 47.00 42.00 5.00 201847 SMO 2005 06 20 20 12 00 318-99 G co CCGG 58.420 -999.990 ... R5 2005 07 21 08 50 00 -14.2300 -170.5600 47.00 42.00 5.00 201848 SMO 2005 06 20 20 40 00 2885-99 S co CCGG 56.370 -999.990 S.. R5 2005 07 21 09 04 00 -14.2300 -170.5600 60.30 42.00 18.30 201845 SMO 2005 06 20 20 40 00 2886-99 S co CCGG 58.740 -999.990 S.. R5 2005 07 21 09 18 00 -14.2300 -170.5600 60.30 42.00 18.30 201846 SMO 2005 06 28 19 50 00 2143-99 G co CCGG 60.700 -999.990 ... R5 2005 07 27 13 16 00 -14.2300 -170.5600 47.00 42.00 5.00 202142 SMO 2005 06 28 19 50 00 2144-99 G co CCGG 60.590 -999.990 ... R5 2005 07 27 13 30 00 -14.2300 -170.5600 47.00 42.00 5.00 202143 SMO 2005 06 28 20 48 00 2031-99 S co CCGG 58.810 -999.990 S.. R5 2005 07 27 13 44 00 -14.2300 -170.5600 60.30 42.00 18.30 202144 SMO 2005 06 28 20 48 00 2032-99 S co CCGG 58.460 -999.990 S.. R5 2005 07 27 13 59 00 -14.2300 -170.5600 60.30 42.00 18.30 202145 SMO 2005 07 05 20 30 00 1951-99 G co CCGG 59.030 -999.990 ... R5 2005 08 08 14 21 00 -14.2300 -170.5600 47.00 42.00 5.00 202785 SMO 2005 07 05 20 30 00 1952-99 G co CCGG 58.800 -999.990 ... R5 2005 08 08 14 35 00 -14.2300 -170.5600 47.00 42.00 5.00 202786 SMO 2005 07 05 21 27 00 2079-99 S co CCGG 59.060 -999.990 S.. R5 2005 08 08 14 49 00 -14.2300 -170.5600 60.30 42.00 18.30 202787 SMO 2005 07 05 21 27 00 2080-99 S co CCGG 57.620 -999.990 S.. R5 2005 08 08 15 03 00 -14.2300 -170.5600 60.30 42.00 18.30 202788 SMO 2005 07 13 19 29 00 3075-99 G co CCGG 62.860 -999.990 ... R5 2005 08 10 14 21 00 -14.2300 -170.5600 47.00 42.00 5.00 202845 SMO 2005 07 13 19 29 00 3076-99 G co CCGG 62.870 -999.990 ... R5 2005 08 10 14 36 00 -14.2300 -170.5600 47.00 42.00 5.00 202846 SMO 2005 07 13 19 52 00 2521-99 S co CCGG 62.950 -999.990 S.. R5 2005 08 10 14 50 00 -14.2300 -170.5600 60.30 42.00 18.30 202843 SMO 2005 07 13 19 52 00 2522-99 S co CCGG 62.490 -999.990 S.. R5 2005 08 10 15 04 00 -14.2300 -170.5600 60.30 42.00 18.30 202844 SMO 2005 07 18 22 32 00 4029-99 G co CCGG 59.690 -999.990 ... R5 2005 08 11 10 10 00 -14.2300 -170.5600 47.00 42.00 5.00 203325 SMO 2005 07 18 22 32 00 4030-99 G co CCGG 59.640 -999.990 ... R5 2005 08 11 10 24 00 -14.2300 -170.5600 47.00 42.00 5.00 203326 SMO 2005 07 18 22 53 00 2733-99 S co CCGG 57.790 -999.990 S.. R5 2005 08 11 09 41 00 -14.2300 -170.5600 60.30 42.00 18.30 203327 SMO 2005 07 18 22 53 00 2734-99 S co CCGG 57.250 -999.990 S.. R5 2005 08 11 09 56 00 -14.2300 -170.5600 60.30 42.00 18.30 203328 SMO 2005 07 29 00 10 00 665-99 G co CCGG 60.560 -999.990 ... R5 2005 08 22 13 31 00 -14.2300 -170.5600 47.00 42.00 5.00 203836 SMO 2005 07 29 00 10 00 666-99 G co CCGG 60.140 -999.990 ... R5 2005 08 22 13 45 00 -14.2300 -170.5600 47.00 42.00 5.00 203837 SMO 2005 07 29 00 40 00 6037-66 S co CCGG 56.830 -999.990 S.. R5 2005 08 22 13 59 00 -14.2300 -170.5600 60.30 42.00 18.30 203834 SMO 2005 07 29 00 40 00 6038-66 S co CCGG 57.010 -999.990 S.. R5 2005 08 22 14 14 00 -14.2300 -170.5600 60.30 42.00 18.30 203835 SMO 2005 08 03 01 40 00 257-99 G co CCGG 58.530 -999.990 ... R5 2005 08 26 12 10 00 -14.2300 -170.5600 47.00 42.00 5.00 204119 SMO 2005 08 03 01 40 00 258-99 G co CCGG 58.190 -999.990 ... R5 2005 08 26 12 24 00 -14.2300 -170.5600 47.00 42.00 5.00 204120 SMO 2005 08 03 02 36 00 1559-99 S co CCGG 59.360 -999.990 S.. R5 2005 08 26 12 38 00 -14.2300 -170.5600 60.30 42.00 18.30 204121 SMO 2005 08 03 02 36 00 1560-99 S co CCGG 59.190 -999.990 S.. R5 2005 08 26 12 52 00 -14.2300 -170.5600 60.30 42.00 18.30 204122 SMO 2005 08 09 01 39 00 2675-99 G co CCGG 61.390 -999.990 ... R5 2005 08 29 13 05 00 -14.2300 -170.5600 47.00 42.00 5.00 204269 SMO 2005 08 09 01 39 00 2676-99 G co CCGG 60.340 -999.990 ... R5 2005 08 29 13 20 00 -14.2300 -170.5600 47.00 42.00 5.00 204270 SMO 2005 08 09 02 35 00 585-99 S co CCGG 57.810 -999.990 S.. R5 2005 08 29 14 02 00 -14.2300 -170.5600 60.30 42.00 18.30 204273 SMO 2005 08 09 02 35 00 586-99 S co CCGG 58.260 -999.990 S.. R5 2005 08 29 14 16 00 -14.2300 -170.5600 60.30 42.00 18.30 204274 SMO 2005 08 17 21 30 00 1411-99 G co CCGG 62.700 -999.990 ... R5 2005 09 09 14 39 00 -14.2300 -170.5600 47.00 42.00 5.00 204761 SMO 2005 08 17 21 30 00 1412-99 G co CCGG 62.370 -999.990 ... R5 2005 09 09 14 54 00 -14.2300 -170.5600 47.00 42.00 5.00 204762 SMO 2005 08 17 23 40 00 163-99 S co CCGG 59.010 -999.990 S.. R5 2005 09 09 14 11 00 -14.2300 -170.5600 60.30 42.00 18.30 204763 SMO 2005 08 17 23 40 00 164-99 S co CCGG 58.160 -999.990 S.. R5 2005 09 09 14 25 00 -14.2300 -170.5600 60.30 42.00 18.30 204764 SMO 2005 08 25 01 13 00 2505-99 G co CCGG 61.300 -999.990 ... R5 2005 09 14 13 38 00 -14.2300 -170.5600 47.00 42.00 5.00 204990 SMO 2005 08 25 01 13 00 2506-99 G co CCGG 61.410 -999.990 ... R5 2005 09 14 13 52 00 -14.2300 -170.5600 47.00 42.00 5.00 204991 SMO 2005 08 25 01 36 00 3559-99 S co CCGG 59.080 -999.990 S.. R5 2005 09 14 14 06 00 -14.2300 -170.5600 60.30 42.00 18.30 204992 SMO 2005 08 25 01 36 00 3560-99 S co CCGG 58.870 -999.990 S.. R5 2005 09 14 14 21 00 -14.2300 -170.5600 60.30 42.00 18.30 204993 SMO 2005 09 01 00 45 00 3817-99 G co CCGG 65.640 -999.990 ... R5 2005 09 29 14 38 00 -14.2300 -170.5600 47.00 42.00 5.00 205734 SMO 2005 09 01 00 45 00 3818-99 G co CCGG 65.760 -999.990 ... R5 2005 09 29 14 53 00 -14.2300 -170.5600 47.00 42.00 5.00 205735 SMO 2005 09 01 01 35 00 501-99 S co CCGG 64.490 -999.990 S.. R5 2005 09 29 15 07 00 -14.2300 -170.5600 60.30 42.00 18.30 205736 SMO 2005 09 01 01 35 00 502-99 S co CCGG 63.880 -999.990 S.. R5 2005 09 29 15 21 00 -14.2300 -170.5600 60.30 42.00 18.30 205737 SMO 2005 09 08 00 30 00 6427-66 G co CCGG 70.040 -999.990 ... R5 2005 10 06 11 34 00 -14.2300 -170.5600 47.00 42.00 5.00 206370 SMO 2005 09 08 00 30 00 6428-66 G co CCGG 63.200 -999.990 ... R5 2005 10 06 11 48 00 -14.2300 -170.5600 47.00 42.00 5.00 206371 SMO 2005 09 08 01 41 00 3369-99 S co CCGG 62.470 -999.990 S.. R5 2005 10 06 12 02 00 -14.2300 -170.5600 60.30 42.00 18.30 206372 SMO 2005 09 08 01 41 00 3370-99 S co CCGG 62.350 -999.990 S.. R5 2005 10 06 12 17 00 -14.2300 -170.5600 60.30 42.00 18.30 206373 SMO 2005 09 13 00 03 00 3337-99 S co CCGG 61.400 -999.990 S.. R5 2005 10 06 10 37 00 -14.2300 -170.5600 60.30 42.00 18.30 206368 SMO 2005 09 13 00 03 00 3338-99 S co CCGG 61.270 -999.990 S.. R5 2005 10 06 10 51 00 -14.2300 -170.5600 60.30 42.00 18.30 206369 SMO 2005 09 13 01 03 00 3975-99 G co CCGG 65.140 -999.990 ... R5 2005 10 06 11 05 00 -14.2300 -170.5600 47.00 42.00 5.00 206366 SMO 2005 09 13 01 03 00 3976-99 G co CCGG 63.860 -999.990 ... R5 2005 10 06 11 20 00 -14.2300 -170.5600 47.00 42.00 5.00 206367 SMO 2005 09 21 00 40 00 2952-99 G co CCGG 72.940 -999.990 ... R5 2005 10 17 09 42 00 -14.2300 -170.5600 47.00 42.00 5.00 206804 SMO 2005 09 21 00 40 00 77-99 G co CCGG 71.000 -999.990 ... R5 2005 10 17 09 56 00 -14.2300 -170.5600 47.00 42.00 5.00 206805 SMO 2005 09 21 01 35 00 141-99 S co CCGG 67.330 -999.990 S.. R5 2005 10 14 15 53 00 -14.2300 -170.5600 60.30 42.00 18.30 206806 SMO 2005 09 21 01 35 00 986-99 S co CCGG 67.670 -999.990 S.. R5 2005 10 14 15 38 00 -14.2300 -170.5600 60.30 42.00 18.30 206807 SMO 2005 09 28 00 45 00 1645-99 G co CCGG 73.500 -999.990 ... R5 2005 10 28 11 39 00 -14.2300 -170.5600 47.00 42.00 5.00 207376 SMO 2005 09 28 00 45 00 1646-99 G co CCGG 72.820 -999.990 ... R5 2005 10 28 11 54 00 -14.2300 -170.5600 47.00 42.00 5.00 207377 SMO 2005 09 28 01 38 00 593-99 S co CCGG 72.020 -999.990 S.. R5 2005 10 28 12 08 00 -14.2300 -170.5600 60.30 42.00 18.30 207378 SMO 2005 09 28 01 38 00 594-99 S co CCGG 70.890 -999.990 S.. R5 2005 10 28 12 22 00 -14.2300 -170.5600 60.30 42.00 18.30 207379 SMO 2005 10 08 00 20 00 4045-99 G co CCGG 74.570 -999.990 ... R5 2005 10 21 13 51 00 -14.2300 -170.5600 47.00 42.00 5.00 207525 SMO 2005 10 08 00 20 00 4046-99 G co CCGG 74.960 -999.990 ... R5 2005 10 21 14 05 00 -14.2300 -170.5600 47.00 42.00 5.00 207526 SMO 2005 10 08 02 37 00 3711-99 S co CCGG 72.410 -999.990 S.. R5 2005 10 21 13 22 00 -14.2300 -170.5600 60.30 42.00 18.30 207527 SMO 2005 10 08 02 37 00 3712-99 S co CCGG 71.620 -999.990 S.. R5 2005 10 21 13 37 00 -14.2300 -170.5600 60.30 42.00 18.30 207528 SMO 2005 10 12 00 35 00 3685-99 G co CCGG 84.130 -999.990 ... R5 2005 11 08 10 16 00 -14.2300 -170.5600 47.00 42.00 5.00 207955 SMO 2005 10 12 00 35 00 3686-99 G co CCGG 84.370 -999.990 ... R5 2005 11 08 10 30 00 -14.2300 -170.5600 47.00 42.00 5.00 207956 SMO 2005 10 12 01 28 00 737-99 S co CCGG 81.810 -999.990 S.. R5 2005 11 08 09 47 00 -14.2300 -170.5600 60.30 42.00 18.30 207957 SMO 2005 10 12 01 28 00 738-99 S co CCGG 82.850 -999.990 S.. R5 2005 11 08 10 02 00 -14.2300 -170.5600 60.30 42.00 18.30 207958 SMO 2005 10 18 00 42 00 4301-99 G co CCGG 70.870 -999.990 ... R5 2005 11 08 10 44 00 -14.2300 -170.5600 47.00 42.00 5.00 207959 SMO 2005 10 18 00 42 00 4302-99 G co CCGG 69.710 -999.990 ... R5 2005 11 08 10 59 00 -14.2300 -170.5600 47.00 42.00 5.00 207960 SMO 2005 10 18 03 03 00 297-99 S co CCGG 66.000 -999.990 S.. R5 2005 11 08 11 13 00 -14.2300 -170.5600 60.30 42.00 18.30 207961 SMO 2005 10 18 03 03 00 298-99 S co CCGG 66.550 -999.990 S.. R5 2005 11 08 11 27 00 -14.2300 -170.5600 60.30 42.00 18.30 207962 SMO 2005 10 27 00 35 00 1832-99 G co CCGG 73.180 -999.990 ... R5 2005 11 18 13 16 00 -14.2300 -170.5600 47.00 42.00 5.00 208776 SMO 2005 10 27 00 35 00 352-99 G co CCGG 73.620 -999.990 ... R5 2005 11 18 13 31 00 -14.2300 -170.5600 47.00 42.00 5.00 208777 SMO 2005 10 27 01 35 00 1751-99 S co CCGG 69.420 -999.990 S.. R5 2005 11 18 13 59 00 -14.2300 -170.5600 60.30 42.00 18.30 208779 SMO 2005 10 27 01 35 00 19-99 S co CCGG 69.380 -999.990 S.. R5 2005 11 18 13 45 00 -14.2300 -170.5600 60.30 42.00 18.30 208778 SMO 2005 11 10 20 37 00 1297-99 G co CCGG 69.080 -999.990 ... R5 2005 12 02 12 14 00 -14.2300 -170.5600 47.00 42.00 5.00 209347 SMO 2005 11 10 20 37 00 3853-99 G co CCGG 68.820 -999.990 ... R5 2005 12 02 12 28 00 -14.2300 -170.5600 47.00 42.00 5.00 209348 SMO 2005 11 10 20 40 00 1197-99 S co CCGG 67.260 -999.990 S.. R5 2005 12 02 12 42 00 -14.2300 -170.5600 60.30 42.00 18.30 209349 SMO 2005 11 10 20 40 00 1858-99 S co CCGG 67.250 -999.990 S.. R5 2005 12 02 12 56 00 -14.2300 -170.5600 60.30 42.00 18.30 209350 SMO 2005 11 17 01 45 00 3867-99 G co CCGG 66.320 -999.990 ... R5 2005 12 06 11 28 00 -14.2300 -170.5600 47.00 42.00 5.00 209686 SMO 2005 11 17 01 45 00 3868-99 G co CCGG 65.770 -999.990 ... R5 2005 12 06 11 42 00 -14.2300 -170.5600 47.00 42.00 5.00 209687 SMO 2005 11 17 02 40 00 3489-99 S co CCGG 62.390 -999.990 S.. R5 2005 12 06 10 59 00 -14.2300 -170.5600 60.30 42.00 18.30 209688 SMO 2005 11 17 02 40 00 3490-99 S co CCGG 62.880 -999.990 S.. R5 2005 12 06 11 13 00 -14.2300 -170.5600 60.30 42.00 18.30 209689 SMO 2005 11 23 21 15 00 2955-99 G co CCGG 68.050 -999.990 ... R5 2005 12 09 12 40 00 -14.2300 -170.5600 47.00 42.00 5.00 210038 SMO 2005 11 23 21 15 00 2956-99 G co CCGG 67.750 -999.990 ... R5 2005 12 09 12 54 00 -14.2300 -170.5600 47.00 42.00 5.00 210039 SMO 2005 11 23 22 25 00 2169-99 S co CCGG 64.220 -999.990 S.. R5 2005 12 09 13 08 00 -14.2300 -170.5600 60.30 42.00 18.30 210040 SMO 2005 11 23 22 25 00 2170-99 S co CCGG 63.860 -999.990 S.. R5 2005 12 09 13 23 00 -14.2300 -170.5600 60.30 42.00 18.30 210041 SMO 2005 12 01 21 25 00 1449-99 G co CCGG 68.210 -999.990 ... R5 2006 01 17 14 04 00 -14.2300 -170.5600 47.00 42.00 5.00 211225 SMO 2005 12 01 21 25 00 1450-99 G co CCGG 66.810 -999.990 ... R5 2006 01 17 14 18 00 -14.2300 -170.5600 47.00 42.00 5.00 211226 SMO 2005 12 01 21 41 00 403-99 S co CCGG 69.440 -999.990 ... R5 2006 01 17 14 32 00 -14.2300 -170.5600 60.30 42.00 18.30 211227 SMO 2005 12 01 21 41 00 404-99 S co CCGG 68.720 -999.990 ... R5 2006 01 17 14 46 00 -14.2300 -170.5600 60.30 42.00 18.30 211228 SMO 2005 12 08 20 28 00 1321-99 G co CCGG 58.930 -999.990 ... R5 2006 01 05 10 07 00 -14.2300 -170.5600 47.00 42.00 5.00 210819 SMO 2005 12 08 20 28 00 1322-99 G co CCGG 58.920 -999.990 ... R5 2006 01 05 10 21 00 -14.2300 -170.5600 47.00 42.00 5.00 210820 SMO 2005 12 08 21 39 00 1692-99 S co CCGG 58.750 -999.990 S.. R5 2006 01 05 11 32 00 -14.2300 -170.5600 60.30 42.00 18.30 210821 SMO 2005 12 08 21 39 00 6638-66 S co CCGG 58.590 -999.990 S.. R5 2006 01 05 11 47 00 -14.2300 -170.5600 60.30 42.00 18.30 210822 SMO 2005 12 13 21 11 00 1729-99 G co CCGG 57.320 -999.990 ... R5 2006 01 17 15 15 00 -14.2300 -170.5600 47.00 42.00 5.00 211230 SMO 2005 12 13 21 11 00 4079-99 G co CCGG 56.880 -999.990 ... R5 2006 01 17 15 01 00 -14.2300 -170.5600 47.00 42.00 5.00 211229 SMO 2005 12 14 00 40 00 317-99 S co CCGG 54.960 -999.990 S.. R5 2006 01 17 15 29 00 -14.2300 -170.5600 60.30 42.00 18.30 211231 SMO 2005 12 14 00 40 00 3806-99 S co CCGG 54.290 -999.990 S.. R5 2006 01 17 15 43 00 -14.2300 -170.5600 60.30 42.00 18.30 211232 SMO 2005 12 20 01 04 00 6162-66 G co CCGG 62.050 -999.990 ... R5 2006 01 17 15 57 00 -14.2300 -170.5600 47.00 42.00 5.00 211241 SMO 2005 12 20 01 04 00 6383-66 G co CCGG 63.060 -999.990 ... R5 2006 01 17 16 12 00 -14.2300 -170.5600 47.00 42.00 5.00 211242 SMO 2005 12 20 01 40 00 1367-99 S co CCGG 59.200 -999.990 S.. R5 2006 01 17 16 40 00 -14.2300 -170.5600 60.30 42.00 18.30 211243 SMO 2005 12 20 01 40 00 412-99 S co CCGG 58.750 -999.990 S.. R5 2006 01 17 16 26 00 -14.2300 -170.5600 60.30 42.00 18.30 211244 SMO 2005 12 29 01 15 00 427-99 G co CCGG 60.010 -999.990 ... R5 2006 01 31 14 20 00 -14.2300 -170.5600 47.00 42.00 5.00 211797 SMO 2005 12 29 01 15 00 428-99 G co CCGG 60.580 -999.990 ... R5 2006 01 31 14 34 00 -14.2300 -170.5600 47.00 42.00 5.00 211798 SMO 2005 12 29 02 28 00 1913-99 S co CCGG 59.740 -999.990 S.. R5 2006 01 31 13 51 00 -14.2300 -170.5600 60.30 42.00 18.30 211799 SMO 2005 12 29 02 28 00 1914-99 S co CCGG 59.160 -999.990 S.. R5 2006 01 31 14 05 00 -14.2300 -170.5600 60.30 42.00 18.30 211800 SMO 2006 01 04 23 36 00 1133-99 S co CCGG 61.190 -999.990 S.. R5 2006 02 07 13 08 00 -14.2300 -170.5600 60.30 42.00 18.30 212092 SMO 2006 01 04 23 36 00 3561-99 S co CCGG 61.460 -999.990 S.. R5 2006 02 07 13 22 00 -14.2300 -170.5600 60.30 42.00 18.30 212093 SMO 2006 01 13 22 40 00 3461-99 S co CCGG 67.090 -999.990 S.. R5 2006 02 07 12 40 00 -14.2300 -170.5600 60.30 42.00 18.30 212094 SMO 2006 01 13 22 40 00 3462-99 S co CCGG 65.610 -999.990 S.. R5 2006 02 07 12 54 00 -14.2300 -170.5600 60.30 42.00 18.30 212095 SMO 2006 01 19 00 35 00 1033-99 G co CCGG 73.230 -999.990 ... R5 2006 03 06 13 49 00 -14.2300 -170.5600 47.00 42.00 5.00 213437 SMO 2006 01 19 00 35 00 1821-99 G co CCGG 71.150 -999.990 ... R5 2006 03 06 14 03 00 -14.2300 -170.5600 47.00 42.00 5.00 213438 SMO 2006 01 19 02 21 00 1251-99 S co CCGG 67.310 -999.990 S.. R5 2006 03 06 13 20 00 -14.2300 -170.5600 60.30 42.00 18.30 213435 SMO 2006 01 19 02 21 00 1252-99 S co CCGG 66.470 -999.990 S.. R5 2006 03 06 13 34 00 -14.2300 -170.5600 60.30 42.00 18.30 213436 SMO 2006 01 27 21 09 00 3793-99 G co CCGG 64.750 -999.990 ... R5 2006 02 16 10 12 00 -14.2300 -170.5600 47.00 42.00 5.00 212846 SMO 2006 01 27 21 09 00 3794-99 G co CCGG 65.920 -999.990 ... R5 2006 02 16 10 26 00 -14.2300 -170.5600 47.00 42.00 5.00 212847 SMO 2006 01 27 21 35 00 2145-99 S co CCGG 60.950 -999.990 S.. R5 2006 02 16 09 44 00 -14.2300 -170.5600 60.30 42.00 18.30 212844 SMO 2006 01 27 21 35 00 2146-99 S co CCGG 60.930 -999.990 S.. R5 2006 02 16 09 58 00 -14.2300 -170.5600 60.30 42.00 18.30 212845 SMO 2006 02 03 22 09 00 2499-99 G co CCGG 76.690 -999.990 ... R5 2006 02 28 15 09 00 -14.2300 -170.5600 47.00 42.00 5.00 213213 SMO 2006 02 03 22 09 00 2500-99 G co CCGG 76.310 -999.990 ... R5 2006 02 28 15 23 00 -14.2300 -170.5600 47.00 42.00 5.00 213214 SMO 2006 02 03 22 38 00 1391-99 S co CCGG 74.860 -999.990 S.. R5 2006 02 28 14 41 00 -14.2300 -170.5600 60.30 42.00 18.30 213211 SMO 2006 02 03 22 38 00 1392-99 S co CCGG 75.130 -999.990 S.. R5 2006 02 28 14 55 00 -14.2300 -170.5600 60.30 42.00 18.30 213212 SMO 2006 02 11 00 25 00 1993-99 G co CCGG 67.730 -999.990 ... R5 2006 03 06 12 23 00 -14.2300 -170.5600 47.00 42.00 5.00 213431 SMO 2006 02 11 00 25 00 1994-99 G co CCGG 67.550 -999.990 ... R5 2006 03 06 12 37 00 -14.2300 -170.5600 47.00 42.00 5.00 213432 SMO 2006 02 11 01 34 00 2185-99 S co CCGG 63.440 -999.990 S.. R5 2006 03 06 12 52 00 -14.2300 -170.5600 60.30 42.00 18.30 213433 SMO 2006 02 11 01 34 00 2186-99 S co CCGG 63.770 -999.990 S.. R5 2006 03 06 13 06 00 -14.2300 -170.5600 60.30 42.00 18.30 213434 SMO 2006 02 14 21 30 00 1948-99 G co CCGG 67.630 -999.990 ... R5 2006 03 07 13 17 00 -14.2300 -170.5600 47.00 42.00 5.00 213426 SMO 2006 02 14 21 30 00 3239-99 G co CCGG 68.250 -999.990 ... R5 2006 03 07 13 03 00 -14.2300 -170.5600 47.00 42.00 5.00 213425 SMO 2006 02 14 23 33 00 2256-99 S co CCGG 64.430 -999.990 S.. R5 2006 03 07 13 39 00 -14.2300 -170.5600 60.30 42.00 18.30 213423 SMO 2006 02 14 23 33 00 6917-66 S co CCGG 64.650 -999.990 S.. R5 2006 03 07 13 53 00 -14.2300 -170.5600 60.30 42.00 18.30 213424 SMO 2006 02 23 22 24 00 3823-99 G co CCGG 71.290 -999.990 ... R5 2006 03 10 13 11 00 -14.2300 -170.5600 47.00 42.00 5.00 213683 SMO 2006 02 23 22 24 00 3824-99 G co CCGG 70.670 -999.990 ... R5 2006 03 10 13 25 00 -14.2300 -170.5600 47.00 42.00 5.00 213684 SMO 2006 02 24 00 38 00 2099-99 S co CCGG 67.720 -999.990 S.. R5 2006 03 10 12 42 00 -14.2300 -170.5600 60.30 42.00 18.30 213681 SMO 2006 02 24 00 38 00 2100-99 S co CCGG 67.710 -999.990 S.. R5 2006 03 10 12 57 00 -14.2300 -170.5600 60.30 42.00 18.30 213682 SMO 2006 02 27 22 05 00 2853-99 G co CCGG 52.620 -999.990 ... R5 2006 03 13 10 10 00 -14.2300 -170.5600 47.00 42.00 5.00 213679 SMO 2006 02 27 22 05 00 2854-99 G co CCGG 52.190 -999.990 ... R5 2006 03 13 10 24 00 -14.2300 -170.5600 47.00 42.00 5.00 213680 SMO 2006 02 27 22 36 00 571-99 S co CCGG 50.020 -999.990 S.. R5 2006 03 13 09 13 00 -14.2300 -170.5600 60.30 42.00 18.30 213677 SMO 2006 02 27 22 36 00 572-99 S co CCGG 49.560 -999.990 S.. R5 2006 03 13 09 27 00 -14.2300 -170.5600 60.30 42.00 18.30 213678 SMO 2006 03 06 21 30 00 3099-99 G co CCGG 55.820 -999.990 ..> R5 2006 03 21 13 46 00 -14.2300 -170.5600 47.00 42.00 5.00 214142 SMO 2006 03 06 21 30 00 3100-99 G co CCGG 55.670 -999.990 ... R5 2006 03 21 14 00 00 -14.2300 -170.5600 47.00 42.00 5.00 214143 SMO 2006 03 06 23 35 00 3659-99 S co CCGG 55.810 -999.990 S.. R5 2006 03 21 13 18 00 -14.2300 -170.5600 60.30 42.00 18.30 214144 SMO 2006 03 06 23 35 00 3660-99 S co CCGG 55.790 -999.990 S.< R5 2006 03 21 13 32 00 -14.2300 -170.5600 60.30 42.00 18.30 214145 SMO 2006 03 15 20 35 00 2704-99 S co CCGG 64.700 -999.990 S.. R5 2006 03 28 12 59 00 -14.2300 -170.5600 60.30 42.00 18.30 214378 SMO 2006 03 15 20 35 00 387-99 S co CCGG 65.240 -999.990 S.. R5 2006 03 28 12 44 00 -14.2300 -170.5600 60.30 42.00 18.30 214377 SMO 2006 03 15 20 45 00 2800-99 G co CCGG 72.360 -999.990 ... R5 2006 03 28 12 16 00 -14.2300 -170.5600 47.00 42.00 5.00 214379 SMO 2006 03 15 20 45 00 6280-66 G co CCGG 71.450 -999.990 ... R5 2006 03 28 12 30 00 -14.2300 -170.5600 47.00 42.00 5.00 214380 SMO 2006 03 20 20 55 00 4151-99 G co CCGG 60.940 -999.990 ... R5 2006 04 03 15 04 00 -14.2300 -170.5600 47.00 42.00 5.00 214702 SMO 2006 03 20 20 55 00 4152-99 G co CCGG 60.790 -999.990 ... R5 2006 04 03 15 19 00 -14.2300 -170.5600 47.00 42.00 5.00 214703 SMO 2006 03 20 22 33 00 1355-99 S co CCGG 58.090 -999.990 S.. R5 2006 04 03 14 36 00 -14.2300 -170.5600 60.30 42.00 18.30 214700 SMO 2006 03 20 22 33 00 1356-99 S co CCGG 57.260 -999.990 S.. R5 2006 04 03 14 50 00 -14.2300 -170.5600 60.30 42.00 18.30 214701 SMO 2006 03 27 21 10 00 2887-99 G co CCGG 48.230 -999.990 ... R5 2006 04 11 11 51 00 -14.2300 -170.5600 47.00 42.00 5.00 215134 SMO 2006 03 27 21 10 00 2888-99 G co CCGG 49.220 -999.990 ... R5 2006 04 11 12 05 00 -14.2300 -170.5600 47.00 42.00 5.00 215135 SMO 2006 03 27 22 39 00 1415-99 S co CCGG 46.010 -999.990 S.. R5 2006 04 11 11 23 00 -14.2300 -170.5600 60.30 42.00 18.30 215136 SMO 2006 03 27 22 39 00 1416-99 S co CCGG 45.620 -999.990 S.. R5 2006 04 11 11 37 00 -14.2300 -170.5600 60.30 42.00 18.30 215137 SMO 2006 04 03 22 05 00 4645-99 G co CCGG 52.470 -999.990 ... R5 2006 04 19 12 38 00 -14.2300 -170.5600 47.00 42.00 5.00 215493 SMO 2006 04 03 22 05 00 4646-99 G co CCGG 52.000 -999.990 ... R5 2006 04 19 12 52 00 -14.2300 -170.5600 47.00 42.00 5.00 215494 SMO 2006 04 03 23 32 00 4655-99 S co CCGG 48.970 -999.990 S.. R5 2006 04 19 13 06 00 -14.2300 -170.5600 60.30 42.00 18.30 215491 SMO 2006 04 03 23 32 00 4656-99 S co CCGG 48.950 -999.990 S.. R5 2006 04 19 13 20 00 -14.2300 -170.5600 60.30 42.00 18.30 215492 SMO 2006 04 10 22 29 00 403-99 S co CCGG 50.300 -999.990 S.. R5 2006 05 16 15 22 00 -14.2300 -170.5600 60.30 42.00 18.30 216568 SMO 2006 04 10 22 29 00 404-99 S co CCGG 49.320 -999.990 S.. R5 2006 05 16 15 37 00 -14.2300 -170.5600 60.30 42.00 18.30 216569 SMO 2006 04 20 11 19 00 4697-99 G co CCGG 60.520 -999.990 ... R5 2006 05 17 08 53 00 -14.2300 -170.5600 47.00 42.00 5.00 216570 SMO 2006 04 20 11 19 00 4698-99 G co CCGG 59.890 -999.990 ... R5 2006 05 17 09 07 00 -14.2300 -170.5600 47.00 42.00 5.00 216571 SMO 2006 04 20 22 35 00 287-99 S co CCGG 55.140 -999.990 S.. R5 2006 05 17 09 22 00 -14.2300 -170.5600 60.30 42.00 18.30 216572 SMO 2006 04 20 22 35 00 288-99 S co CCGG 55.590 -999.990 S.. R5 2006 05 17 09 36 00 -14.2300 -170.5600 60.30 42.00 18.30 216573 SMO 2006 04 25 22 20 00 3535-99 G co CCGG 51.500 -999.990 ... R5 2006 05 23 12 21 00 -14.2300 -170.5600 47.00 42.00 5.00 216817 SMO 2006 04 25 22 20 00 3536-99 G co CCGG 51.340 -999.990 ... R5 2006 05 23 12 35 00 -14.2300 -170.5600 47.00 42.00 5.00 216818 SMO 2006 04 25 23 15 00 2443-99 S co CCGG 47.990 -999.990 S.. R5 2006 05 17 09 50 00 -14.2300 -170.5600 60.30 42.00 18.30 216574 SMO 2006 04 25 23 15 00 2444-99 S co CCGG 47.890 -999.990 S.. R5 2006 05 17 10 04 00 -14.2300 -170.5600 60.30 42.00 18.30 216575 SMO 2006 05 02 23 05 00 1893-99 S co CCGG 53.130 -999.990 S.. R5 2006 06 01 12 12 00 -14.2300 -170.5600 60.30 42.00 18.30 217178 SMO 2006 05 02 23 05 00 214-99 S co CCGG 53.460 -999.990 S.. R5 2006 06 01 12 26 00 -14.2300 -170.5600 60.30 42.00 18.30 217179 SMO 2006 05 02 23 15 00 1935-99 G co CCGG 54.760 -999.990 ... R5 2006 05 23 12 50 00 -14.2300 -170.5600 47.00 42.00 5.00 216815 SMO 2006 05 02 23 15 00 1936-99 G co CCGG 54.480 -999.990 ... R5 2006 05 23 13 04 00 -14.2300 -170.5600 47.00 42.00 5.00 216816 SMO 2006 05 11 21 01 00 529-99 G co CCGG 58.700 -999.990 ... R5 2006 06 01 12 40 00 -14.2300 -170.5600 47.00 42.00 5.00 217176 SMO 2006 05 11 21 01 00 530-99 G co CCGG 58.690 -999.990 ... R5 2006 06 01 12 55 00 -14.2300 -170.5600 47.00 42.00 5.00 217177 SMO 2006 05 11 22 24 00 4298-99 S co CCGG 54.520 -999.990 S.. R5 2006 06 09 13 52 00 -14.2300 -170.5600 60.30 42.00 18.30 217567 SMO 2006 05 11 22 24 00 6417-66 S co CCGG 63.390 -999.990 S.. R5 2006 06 09 13 38 00 -14.2300 -170.5600 60.30 42.00 18.30 217568 SMO 2006 05 18 20 59 00 1533-99 G co CCGG 47.530 -999.990 A.. R5 2006 06 22 14 09 00 -14.2300 -170.5600 47.00 42.00 5.00 218044 SMO 2006 05 18 20 59 00 1534-99 G co CCGG 47.720 -999.990 A.. R5 2006 06 22 14 23 00 -14.2300 -170.5600 47.00 42.00 5.00 218045 SMO 2006 05 18 21 39 00 3835-99 S co CCGG 62.220 -999.990 S.. R5 2006 06 09 14 06 00 -14.2300 -170.5600 60.30 42.00 18.30 217565 SMO 2006 05 18 21 39 00 3836-99 S co CCGG 61.740 -999.990 S.. R5 2006 06 09 14 21 00 -14.2300 -170.5600 60.30 42.00 18.30 217566 SMO 2006 05 23 20 50 00 2953-99 G co CCGG 33.570 -999.990 A.. R5 2006 06 22 13 41 00 -14.2300 -170.5600 47.00 42.00 5.00 218042 SMO 2006 05 23 20 50 00 2954-99 G co CCGG 33.430 -999.990 A.. R5 2006 06 22 13 55 00 -14.2300 -170.5600 47.00 42.00 5.00 218043 SMO 2006 05 23 21 35 00 412-99 S co CCGG 50.570 -999.990 S.. R5 2006 06 29 10 34 00 -14.2300 -170.5600 60.30 42.00 18.30 218250 SMO 2006 05 23 21 35 00 51-99 S co CCGG 50.260 -999.990 S.. R5 2006 06 29 10 20 00 -14.2300 -170.5600 60.30 42.00 18.30 218251 SMO 2006 05 30 20 21 00 3193-99 G co CCGG 51.820 -999.990 ... R5 2006 07 17 11 44 00 -14.2300 -170.5600 47.00 42.00 5.00 219006 SMO 2006 05 30 20 21 00 3194-99 G co CCGG 52.510 -999.990 ... R5 2006 07 17 11 59 00 -14.2300 -170.5600 47.00 42.00 5.00 219007 SMO 2006 05 30 21 00 00 4349-99 S co CCGG 50.100 -999.990 S.. R5 2006 06 29 10 06 00 -14.2300 -170.5600 60.30 42.00 18.30 218249 SMO 2006 05 30 21 00 00 4699-99 S co CCGG 50.190 -999.990 S.. R5 2006 06 29 09 51 00 -14.2300 -170.5600 60.30 42.00 18.30 218248 SMO 2006 06 08 01 00 00 181-99 G co CCGG 58.840 -999.990 ... R5 2006 06 30 14 35 00 -14.2300 -170.5600 47.00 42.00 5.00 218454 SMO 2006 06 08 01 00 00 182-99 G co CCGG 57.960 -999.990 ... R5 2006 06 30 14 49 00 -14.2300 -170.5600 47.00 42.00 5.00 218455 SMO 2006 06 08 01 57 00 797-99 S co CCGG 55.540 -999.990 S.. R5 2006 06 30 15 03 00 -14.2300 -170.5600 60.30 42.00 18.30 218456 SMO 2006 06 08 01 57 00 798-99 S co CCGG 55.200 -999.990 S.. R5 2006 06 30 15 17 00 -14.2300 -170.5600 60.30 42.00 18.30 218457 SMO 2006 06 14 22 55 00 923-99 G co CCGG 55.240 -999.990 ... R5 2006 07 13 16 11 00 -14.2300 -170.5600 47.00 42.00 5.00 218734 SMO 2006 06 14 23 29 00 1751-99 S co CCGG 52.400 -999.990 S.. R5 2006 07 11 15 38 00 -14.2300 -170.5600 60.30 42.00 18.30 218735 SMO 2006 06 14 23 29 00 6091-66 S co CCGG 53.130 -999.990 S.. R5 2006 07 11 15 24 00 -14.2300 -170.5600 60.30 42.00 18.30 218736 SMO 2006 06 21 22 10 00 3641-99 G co CCGG 56.210 -999.990 ... R5 2006 07 11 09 42 00 -14.2300 -170.5600 47.00 42.00 5.00 219191 SMO 2006 06 21 22 10 00 3642-99 G co CCGG 54.920 -999.990 ... R5 2006 07 11 09 56 00 -14.2300 -170.5600 47.00 42.00 5.00 219192 SMO 2006 06 21 23 25 00 2447-99 S co CCGG 56.540 -999.990 S.. R5 2006 07 17 11 16 00 -14.2300 -170.5600 60.30 42.00 18.30 219004 SMO 2006 06 21 23 25 00 2448-99 S co CCGG 54.440 -999.990 S.. R5 2006 07 17 11 30 00 -14.2300 -170.5600 60.30 42.00 18.30 219005 SMO 2006 06 28 22 30 00 2019-99 G co CCGG 60.710 -999.990 ... R5 2006 07 11 10 11 00 -14.2300 -170.5600 47.00 42.00 5.00 219193 SMO 2006 06 28 22 30 00 2020-99 G co CCGG 60.650 -999.990 ... R5 2006 07 11 10 25 00 -14.2300 -170.5600 47.00 42.00 5.00 219194 SMO 2006 06 28 23 35 00 6215-66 S co CCGG 58.420 -999.990 S.. R5 2006 07 25 14 42 00 -14.2300 -170.5600 60.30 42.00 18.30 219776 SMO 2006 06 28 23 35 00 6216-66 S co CCGG 57.810 -999.990 S.. R5 2006 07 25 14 56 00 -14.2300 -170.5600 60.30 42.00 18.30 219777 SMO 2006 07 05 22 55 00 757-99 G co CCGG 56.080 -999.990 ... R5 2006 08 07 13 30 00 -14.2300 -170.5600 47.00 42.00 5.00 220035 SMO 2006 07 05 22 55 00 758-99 G co CCGG 57.050 -999.990 ... R5 2006 08 07 13 44 00 -14.2300 -170.5600 47.00 42.00 5.00 220036 SMO 2006 07 06 00 40 00 1419-99 S co CCGG 52.800 -999.990 S.. R5 2006 07 25 14 13 00 -14.2300 -170.5600 60.30 42.00 18.30 219774 SMO 2006 07 06 00 40 00 1420-99 S co CCGG 52.840 -999.990 S.. R5 2006 07 25 14 27 00 -14.2300 -170.5600 60.30 42.00 18.30 219775 SMO 2006 07 13 22 00 00 3791-99 G co CCGG 58.260 -999.990 ... R5 2006 08 15 16 08 00 -14.2300 -170.5600 47.00 42.00 5.00 220290 SMO 2006 07 13 22 00 00 3792-99 G co CCGG 57.800 -999.990 ... R5 2006 08 15 16 22 00 -14.2300 -170.5600 47.00 42.00 5.00 220291 SMO 2006 07 13 23 10 00 1063-99 S co CCGG 55.320 -999.990 S.. R5 2006 08 07 13 58 00 -14.2300 -170.5600 60.30 42.00 18.30 220033 SMO 2006 07 13 23 10 00 1064-99 S co CCGG 54.820 -999.990 S.. R5 2006 08 07 14 12 00 -14.2300 -170.5600 60.30 42.00 18.30 220034 SMO 2006 07 19 23 19 00 3863-99 S co CCGG 53.520 -999.990 S.. R5 2006 08 15 15 40 00 -14.2300 -170.5600 60.30 42.00 18.30 220292 SMO 2006 07 19 23 19 00 3864-99 S co CCGG 53.710 -999.990 S.. R5 2006 08 15 15 54 00 -14.2300 -170.5600 60.30 42.00 18.30 220293 SMO 2006 07 20 00 51 00 6389-66 G co CCGG 56.960 -999.990 ... R5 2006 08 18 11 51 00 -14.2300 -170.5600 47.00 42.00 5.00 220616 SMO 2006 07 20 00 51 00 6390-66 G co CCGG 57.570 -999.990 ... R5 2006 08 18 12 05 00 -14.2300 -170.5600 47.00 42.00 5.00 220617 SMO 2006 07 28 00 27 00 3139-99 G co CCGG 55.810 -999.990 ... R5 2006 08 23 14 49 00 -14.2300 -170.5600 47.00 42.00 5.00 220890 SMO 2006 07 28 00 27 00 3140-99 G co CCGG 55.900 -999.990 ... R5 2006 08 23 15 03 00 -14.2300 -170.5600 47.00 42.00 5.00 220891 SMO 2006 07 28 02 20 00 4399-99 S co CCGG 53.260 -999.990 S.. R5 2006 08 18 12 20 00 -14.2300 -170.5600 60.30 42.00 18.30 220618 SMO 2006 07 28 02 20 00 4400-99 S co CCGG 53.480 -999.990 S.. R5 2006 08 18 12 34 00 -14.2300 -170.5600 60.30 42.00 18.30 220619 SMO 2006 08 03 01 02 00 6339-66 S co CCGG 56.450 -999.990 S.. R5 2006 08 23 14 20 00 -14.2300 -170.5600 60.30 42.00 18.30 220888 SMO 2006 08 03 01 02 00 6340-66 S co CCGG 55.940 -999.990 S.. R5 2006 08 23 14 35 00 -14.2300 -170.5600 60.30 42.00 18.30 220889 SMO 2006 08 03 01 28 00 3705-99 G co CCGG 58.680 -999.990 ... R5 2006 08 28 14 55 00 -14.2300 -170.5600 47.00 42.00 5.00 221127 SMO 2006 08 03 01 28 00 3706-99 G co CCGG 58.180 -999.990 ... R5 2006 08 28 15 09 00 -14.2300 -170.5600 47.00 42.00 5.00 221128 SMO 2006 08 10 00 15 00 3833-99 G co CCGG 60.430 -999.990 ... R5 2006 10 03 10 16 00 -14.2300 -170.5600 47.00 42.00 5.00 222710 SMO 2006 08 10 00 15 00 3834-99 G co CCGG 59.120 -999.990 ... R5 2006 10 03 10 30 00 -14.2300 -170.5600 47.00 42.00 5.00 222711 SMO 2006 08 10 01 35 00 6701-66 S co CCGG 57.750 -999.990 S.. R5 2006 08 28 15 24 00 -14.2300 -170.5600 60.30 42.00 18.30 221125 SMO 2006 08 10 01 35 00 6702-66 S co CCGG 57.780 -999.990 S.. R5 2006 08 28 15 38 00 -14.2300 -170.5600 60.30 42.00 18.30 221126 SMO 2006 08 17 00 50 00 2787-99 G co CCGG 58.020 -999.990 ... R5 2006 09 18 15 58 00 -14.2300 -170.5600 47.00 42.00 5.00 222205 SMO 2006 08 17 00 50 00 2788-99 G co CCGG 57.310 -999.990 ... R5 2006 09 18 16 12 00 -14.2300 -170.5600 47.00 42.00 5.00 222206 SMO 2006 08 17 02 40 00 6249-66 S co CCGG 56.720 -999.990 S.. R5 2006 10 03 11 13 00 -14.2300 -170.5600 60.30 42.00 18.30 222708 SMO 2006 08 17 02 40 00 6250-66 S co CCGG 56.450 -999.990 S.. R5 2006 10 03 11 27 00 -14.2300 -170.5600 60.30 42.00 18.30 222709 SMO 2006 08 25 22 10 00 2977-99 G co CCGG 59.490 -999.990 ... R5 2006 09 18 14 33 00 -14.2300 -170.5600 47.00 42.00 5.00 222203 SMO 2006 08 25 22 10 00 2978-99 G co CCGG 58.680 -999.990 ... R5 2006 09 18 14 47 00 -14.2300 -170.5600 47.00 42.00 5.00 222204 SMO 2006 08 25 23 29 00 3835-99 S co CCGG 55.340 -999.990 S.. R5 2006 09 19 11 29 00 -14.2300 -170.5600 60.30 42.00 18.30 222191 SMO 2006 08 25 23 29 00 3836-99 S co CCGG 55.900 -999.990 S.. R5 2006 09 19 11 43 00 -14.2300 -170.5600 60.30 42.00 18.30 222192 SMO 2006 08 28 21 23 00 1517-99 G co CCGG 60.290 -999.990 ... R5 2006 09 19 11 00 00 -14.2300 -170.5600 47.00 42.00 5.00 222189 SMO 2006 08 28 21 23 00 1518-99 G co CCGG 59.800 -999.990 ... R5 2006 09 19 11 14 00 -14.2300 -170.5600 47.00 42.00 5.00 222190 SMO 2006 08 28 21 39 00 67-99 S co CCGG 57.040 -999.990 S.. R5 2006 09 21 09 38 00 -14.2300 -170.5600 60.30 42.00 18.30 222608 SMO 2006 08 28 21 39 00 68-99 S co CCGG 57.420 -999.990 S.. R5 2006 09 21 09 53 00 -14.2300 -170.5600 60.30 42.00 18.30 222609 SMO 2006 09 06 20 50 00 1445-99 G co CCGG 66.010 -999.990 ... R5 2006 09 21 11 04 00 -14.2300 -170.5600 47.00 42.00 5.00 222606 SMO 2006 09 06 20 50 00 1446-99 G co CCGG 65.490 -999.990 ... R5 2006 09 21 11 18 00 -14.2300 -170.5600 47.00 42.00 5.00 222607 SMO 2006 09 06 21 57 00 2723-99 S co CCGG 62.620 -999.990 S.. R5 2006 09 28 13 16 00 -14.2300 -170.5600 60.30 42.00 18.30 222931 SMO 2006 09 06 21 57 00 2724-99 S co CCGG 62.460 -999.990 S.. R5 2006 09 28 13 30 00 -14.2300 -170.5600 60.30 42.00 18.30 222932 SMO 2006 09 11 21 00 00 4409-99 G co CCGG 65.880 -999.990 ... R5 2006 10 11 10 40 00 -14.2300 -170.5600 47.00 42.00 5.00 223331 SMO 2006 09 11 21 00 00 4410-99 G co CCGG 64.990 -999.990 ... R5 2006 10 11 10 54 00 -14.2300 -170.5600 47.00 42.00 5.00 223332 SMO 2006 09 11 22 13 00 3846-99 S co CCGG 62.270 -999.990 S.. R5 2006 09 28 14 27 00 -14.2300 -170.5600 60.30 42.00 18.30 222930 SMO 2006 09 19 20 28 00 4155-99 G co CCGG 63.030 -999.990 ... R5 2006 10 19 11 41 00 -14.2300 -170.5600 47.00 42.00 5.00 223672 SMO 2006 09 19 20 28 00 4156-99 G co CCGG 62.720 -999.990 ... R5 2006 10 19 11 55 00 -14.2300 -170.5600 47.00 42.00 5.00 223673 SMO 2006 09 19 22 04 00 6469-66 S co CCGG 60.680 -999.990 S.. R5 2006 10 11 11 08 00 -14.2300 -170.5600 60.30 42.00 18.30 223329 SMO 2006 09 19 22 04 00 6470-66 S co CCGG 60.720 -999.990 S.. R5 2006 10 11 11 22 00 -14.2300 -170.5600 60.30 42.00 18.30 223330 SMO 2006 09 25 20 48 00 1809-99 G co CCGG 73.080 -999.990 ... R5 2006 10 19 12 09 00 -14.2300 -170.5600 47.00 42.00 5.00 223674 SMO 2006 09 25 20 48 00 1810-99 G co CCGG 72.860 -999.990 ... R5 2006 10 19 12 23 00 -14.2300 -170.5600 47.00 42.00 5.00 223675 SMO 2006 09 25 22 15 00 3391-99 S co CCGG 68.890 -999.990 S.. R5 2006 10 23 10 38 00 -14.2300 -170.5600 60.30 42.00 18.30 223806 SMO 2006 09 25 22 15 00 3392-99 S co CCGG 69.190 -999.990 S.. R5 2006 10 23 10 52 00 -14.2300 -170.5600 60.30 42.00 18.30 223807 SMO 2006 10 05 20 11 00 6137-66 G co CCGG 68.180 -999.990 ... R5 2006 10 23 10 09 00 -14.2300 -170.5600 47.00 42.00 5.00 223804 SMO 2006 10 05 20 11 00 6138-66 G co CCGG 69.090 -999.990 ... R5 2006 10 23 10 24 00 -14.2300 -170.5600 47.00 42.00 5.00 223805 SMO 2006 10 05 21 06 00 6501-66 S co CCGG 66.110 -999.990 S.. R5 2006 10 31 10 40 00 -14.2300 -170.5600 60.30 42.00 18.30 224085 SMO 2006 10 05 21 06 00 6502-66 S co CCGG 66.560 -999.990 S.. R5 2006 10 31 10 54 00 -14.2300 -170.5600 60.30 42.00 18.30 224086 SMO 2006 10 11 20 54 00 2633-99 G co CCGG 70.130 -999.990 ... R5 2006 10 31 11 09 00 -14.2300 -170.5600 47.00 42.00 5.00 224087 SMO 2006 10 11 20 54 00 2634-99 G co CCGG 69.470 -999.990 ... R5 2006 10 31 11 23 00 -14.2300 -170.5600 47.00 42.00 5.00 224088 SMO 2006 10 11 22 06 00 2755-99 S co CCGG 66.920 -999.990 S.. R5 2006 11 07 08 52 00 -14.2300 -170.5600 60.30 42.00 18.30 224453 SMO 2006 10 11 22 06 00 2756-99 S co CCGG 66.660 -999.990 S.. R5 2006 11 07 09 06 00 -14.2300 -170.5600 60.30 42.00 18.30 224454 SMO 2006 10 16 20 47 00 3139-99 G co CCGG 69.610 -999.990 ... R5 2006 11 13 10 17 00 -14.2300 -170.5600 47.00 42.00 5.00 224792 SMO 2006 10 16 20 47 00 3140-99 G co CCGG 69.310 -999.990 ... R5 2006 11 13 10 31 00 -14.2300 -170.5600 47.00 42.00 5.00 224793 SMO 2006 10 16 22 07 00 1663-99 S co CCGG 66.790 -999.990 S.. R5 2006 11 07 09 20 00 -14.2300 -170.5600 60.30 42.00 18.30 224455 SMO 2006 10 16 22 07 00 1664-99 S co CCGG 67.130 -999.990 S.. R5 2006 11 07 09 35 00 -14.2300 -170.5600 60.30 42.00 18.30 224456 SMO 2006 10 23 20 09 00 3785-99 G co CCGG 69.620 -999.990 ... R5 2006 11 13 09 46 00 -14.2300 -170.5600 47.00 42.00 5.00 224790 SMO 2006 10 23 20 09 00 3786-99 G co CCGG 69.760 -999.990 ... R5 2006 11 13 10 00 00 -14.2300 -170.5600 47.00 42.00 5.00 224791 SMO 2006 10 23 21 02 00 6925-66 S co CCGG 65.800 -999.990 S.. R5 2006 11 17 13 48 00 -14.2300 -170.5600 60.30 42.00 18.30 225154 SMO 2006 10 23 21 02 00 6926-66 S co CCGG 65.820 -999.990 S.. R5 2006 11 17 14 03 00 -14.2300 -170.5600 60.30 42.00 18.30 225155 SMO 2006 10 30 21 01 00 827-99 G co CCGG 70.350 -999.990 ... R5 2006 11 17 14 17 00 -14.2300 -170.5600 47.00 42.00 5.00 225156 SMO 2006 10 30 21 01 00 828-99 G co CCGG 69.500 -999.990 ... R5 2006 11 17 14 31 00 -14.2300 -170.5600 47.00 42.00 5.00 225157 SMO 2006 10 30 21 37 00 6681-66 S co CCGG 68.490 -999.990 S.. R5 2006 11 29 12 05 00 -14.2300 -170.5600 60.30 42.00 18.30 225347 SMO 2006 10 30 21 37 00 6682-66 S co CCGG 67.600 -999.990 S.. R5 2006 11 29 12 20 00 -14.2300 -170.5600 60.30 42.00 18.30 225348 SMO 2006 11 07 20 07 00 3731-99 G co CCGG 65.480 -999.990 ... R5 2006 11 29 12 34 00 -14.2300 -170.5600 47.00 42.00 5.00 225351 SMO 2006 11 07 20 07 00 3732-99 G co CCGG 65.520 -999.990 ... R5 2006 11 29 12 48 00 -14.2300 -170.5600 47.00 42.00 5.00 225352 SMO 2006 11 07 23 04 00 2823-99 S co CCGG 61.920 -999.990 S.. R5 2006 11 29 11 37 00 -14.2300 -170.5600 60.30 42.00 18.30 225349 SMO 2006 11 07 23 04 00 2824-99 S co CCGG 61.190 -999.990 S.. R5 2006 11 29 11 51 00 -14.2300 -170.5600 60.30 42.00 18.30 225350 SMO 2006 11 13 20 11 00 2747-99 G co CCGG 69.580 -999.990 ... R5 2006 12 05 12 34 00 -14.2300 -170.5600 47.00 42.00 5.00 225623 SMO 2006 11 13 20 11 00 2748-99 G co CCGG 69.150 -999.990 ... R5 2006 12 05 12 48 00 -14.2300 -170.5600 47.00 42.00 5.00 225624 SMO 2006 11 13 21 29 00 4223-99 S co CCGG 65.640 -999.990 S.. R5 2006 12 05 13 02 00 -14.2300 -170.5600 60.30 42.00 18.30 225625 SMO 2006 11 13 21 29 00 4224-99 S co CCGG 65.500 -999.990 S.. R5 2006 12 05 13 16 00 -14.2300 -170.5600 60.30 42.00 18.30 225626 SMO 2006 11 21 20 40 00 6701-66 G co CCGG 67.090 -999.990 ... R5 2006 12 11 09 43 00 -14.2300 -170.5600 47.00 42.00 5.00 225886 SMO 2006 11 21 20 40 00 6702-66 G co CCGG 67.300 -999.990 ... R5 2006 12 11 09 57 00 -14.2300 -170.5600 47.00 42.00 5.00 225887 SMO 2006 11 21 21 36 00 3373-99 S co CCGG 63.790 -999.990 S.. R5 2006 12 11 10 12 00 -14.2300 -170.5600 60.30 42.00 18.30 225888 SMO 2006 11 21 21 36 00 3374-99 S co CCGG 63.630 -999.990 S.. R5 2006 12 11 10 26 00 -14.2300 -170.5600 60.30 42.00 18.30 225889 SMO 2006 11 28 20 11 00 1587-99 G co CCGG 64.660 -999.990 ... R5 2006 12 18 13 10 00 -14.2300 -170.5600 47.00 42.00 5.00 226283 SMO 2006 11 28 20 11 00 1588-99 G co CCGG 64.100 -999.990 ... R5 2006 12 18 13 24 00 -14.2300 -170.5600 47.00 42.00 5.00 226284 SMO 2006 11 28 21 14 00 1133-99 S co CCGG 61.180 -999.990 S.. R5 2006 12 18 12 41 00 -14.2300 -170.5600 60.30 42.00 18.30 226285 SMO 2006 11 28 21 14 00 1134-99 S co CCGG 61.270 -999.990 S.. R5 2006 12 18 12 55 00 -14.2300 -170.5600 60.30 42.00 18.30 226286 SMO 2006 12 07 20 45 00 1513-99 G co CCGG 63.750 -999.990 ... R5 2006 12 19 14 14 00 -14.2300 -170.5600 47.00 42.00 5.00 226345 SMO 2006 12 07 20 45 00 970-99 G co CCGG 63.260 -999.990 ... R5 2006 12 19 13 59 00 -14.2300 -170.5600 47.00 42.00 5.00 226346 SMO 2006 12 07 22 00 00 2900-99 S co CCGG 59.270 -999.990 S.. R5 2006 12 19 13 45 00 -14.2300 -170.5600 60.30 42.00 18.30 226344 SMO 2006 12 07 22 00 00 869-99 S co CCGG 59.090 -999.990 S.. R5 2006 12 19 13 31 00 -14.2300 -170.5600 60.30 42.00 18.30 226343 SMO 2006 12 15 22 00 00 3387-99 G co CCGG 61.860 -999.990 ... R5 2007 01 22 15 01 00 -14.2300 -170.5600 47.00 42.00 5.00 227103 SMO 2006 12 15 22 00 00 3388-99 G co CCGG 61.680 -999.990 ... R5 2007 01 22 15 15 00 -14.2300 -170.5600 47.00 42.00 5.00 227104 SMO 2006 12 15 23 34 00 463-99 S co CCGG 57.490 -999.990 S.. R5 2007 01 22 14 04 00 -14.2300 -170.5600 60.30 42.00 18.30 227099 SMO 2006 12 15 23 34 00 464-99 S co CCGG 57.440 -999.990 S.. R5 2007 01 22 14 18 00 -14.2300 -170.5600 60.30 42.00 18.30 227100 SMO 2006 12 18 20 02 00 2393-99 G co CCGG 65.910 -999.990 ... R5 2007 01 22 14 32 00 -14.2300 -170.5600 47.00 42.00 5.00 227101 SMO 2006 12 18 20 02 00 2394-99 G co CCGG 66.040 -999.990 ... R5 2007 01 22 14 46 00 -14.2300 -170.5600 47.00 42.00 5.00 227102 SMO 2006 12 18 21 14 00 6255-66 S co CCGG 62.280 -999.990 S.. R5 2007 01 22 13 35 00 -14.2300 -170.5600 60.30 42.00 18.30 227097 SMO 2006 12 18 21 14 00 6256-66 S co CCGG 62.130 -999.990 S.. R5 2007 01 22 13 49 00 -14.2300 -170.5600 60.30 42.00 18.30 227098 SMO 2006 12 29 21 50 00 957-99 G co CCGG 64.270 -999.990 ... R5 2007 02 01 15 27 00 -14.2300 -170.5600 47.00 42.00 5.00 227822 SMO 2006 12 29 21 50 00 958-99 G co CCGG 64.110 -999.990 ... R5 2007 02 01 15 41 00 -14.2300 -170.5600 47.00 42.00 5.00 227823 SMO 2006 12 29 22 41 00 4607-99 S co CCGG 61.960 -999.990 S.. R5 2007 02 01 14 59 00 -14.2300 -170.5600 60.30 42.00 18.30 227826 SMO 2006 12 29 22 41 00 4608-99 S co CCGG 61.580 -999.990 S.. R5 2007 02 01 15 13 00 -14.2300 -170.5600 60.30 42.00 18.30 227827 SMO 2007 01 03 20 04 00 4113-99 G co CCGG 59.850 -999.990 ... R5 2007 02 01 14 30 00 -14.2300 -170.5600 47.00 42.00 5.00 227820 SMO 2007 01 03 20 04 00 4114-99 G co CCGG 58.590 -999.990 ... R5 2007 02 01 14 45 00 -14.2300 -170.5600 47.00 42.00 5.00 227821 SMO 2007 01 03 21 08 00 6017-66 S co CCGG 54.990 -999.990 S.. R5 2007 02 01 14 02 00 -14.2300 -170.5600 60.30 42.00 18.30 227824 SMO 2007 01 03 21 08 00 6018-66 S co CCGG 54.890 -999.990 S.. R5 2007 02 01 14 16 00 -14.2300 -170.5600 60.30 42.00 18.30 227825 SMO 2007 01 12 20 52 00 331-99 G co CCGG 61.510 -999.990 ... R5 2007 02 09 15 24 00 -14.2300 -170.5600 47.00 42.00 5.00 228615 SMO 2007 01 12 20 52 00 332-99 G co CCGG 61.120 -999.990 ... R5 2007 02 09 15 38 00 -14.2300 -170.5600 47.00 42.00 5.00 228616 SMO 2007 01 12 22 14 00 1785-99 S co CCGG 58.580 -999.990 S.. R5 2007 02 09 14 27 00 -14.2300 -170.5600 60.30 42.00 18.30 228613 SMO 2007 01 12 22 14 00 1786-99 S co CCGG 655.090 -999.990 S.C R5 2007 02 09 14 41 00 -14.2300 -170.5600 60.30 42.00 18.30 228614 SMO 2007 01 16 21 27 00 6187-66 S co CCGG 57.710 -999.990 S.. R5 2007 02 09 14 12 00 -14.2300 -170.5600 60.30 42.00 18.30 228612 SMO 2007 01 16 21 27 00 6301-66 S co CCGG 56.760 -999.990 S.. R5 2007 02 09 13 58 00 -14.2300 -170.5600 60.30 42.00 18.30 228611 SMO 2007 01 16 22 16 00 107-99 G co CCGG 61.150 -999.990 ... R5 2007 02 09 14 55 00 -14.2300 -170.5600 47.00 42.00 5.00 228617 SMO 2007 01 16 22 16 00 3628-99 G co CCGG 62.080 -999.990 ... R5 2007 02 09 15 09 00 -14.2300 -170.5600 47.00 42.00 5.00 228618 SMO 2007 01 24 20 07 00 1603-99 G co CCGG 60.290 -999.990 ... R5 2007 02 14 14 34 00 -14.2300 -170.5600 47.00 42.00 5.00 229031 SMO 2007 01 24 20 07 00 1604-99 G co CCGG 59.720 -999.990 ... R5 2007 02 14 14 48 00 -14.2300 -170.5600 47.00 42.00 5.00 229032 SMO 2007 01 24 21 25 00 1321-99 S co CCGG 56.110 -999.990 S.. R5 2007 02 14 15 02 00 -14.2300 -170.5600 60.30 42.00 18.30 229029 SMO 2007 01 24 21 25 00 1322-99 S co CCGG 55.480 -999.990 S.. R5 2007 02 14 15 17 00 -14.2300 -170.5600 60.30 42.00 18.30 229030 SMO 2007 01 29 23 05 00 3023-99 G co CCGG 58.160 -999.990 ... R5 2007 02 23 11 04 00 -14.2300 -170.5600 47.00 42.00 5.00 229438 SMO 2007 01 29 23 05 00 3024-99 G co CCGG 57.650 -999.990 ... R5 2007 02 23 11 19 00 -14.2300 -170.5600 47.00 42.00 5.00 229439 SMO 2007 01 29 23 40 00 3977-99 S co CCGG 54.530 -999.990 S.. R5 2007 02 23 11 33 00 -14.2300 -170.5600 60.30 42.00 18.30 229440 SMO 2007 01 29 23 40 00 3978-99 S co CCGG 54.630 -999.990 S.. R5 2007 02 23 11 47 00 -14.2300 -170.5600 60.30 42.00 18.30 229441 SMO 2007 02 08 20 15 00 3321-99 G co CCGG 77.320 -999.990 ... R5 2007 03 12 15 10 00 -14.2300 -170.5600 47.00 42.00 5.00 230255 SMO 2007 02 08 20 15 00 3322-99 G co CCGG 76.970 -999.990 ... R5 2007 03 12 15 24 00 -14.2300 -170.5600 47.00 42.00 5.00 230256 SMO 2007 02 08 21 37 00 117-99 S co CCGG 74.700 -999.990 S.. R5 2007 03 12 15 38 00 -14.2300 -170.5600 60.30 42.00 18.30 230257 SMO 2007 02 08 21 37 00 118-99 S co CCGG 74.360 -999.990 S.. R5 2007 03 12 15 52 00 -14.2300 -170.5600 60.30 42.00 18.30 230258 SMO 2007 02 14 20 24 00 3045-99 G co CCGG 71.050 -999.990 ... R5 2007 03 12 16 35 00 -14.2300 -170.5600 47.00 42.00 5.00 230259 SMO 2007 02 14 20 24 00 3046-99 G co CCGG 70.400 -999.990 ... R5 2007 03 12 16 49 00 -14.2300 -170.5600 47.00 42.00 5.00 230260 SMO 2007 02 14 22 01 00 2729-99 S co CCGG 68.980 -999.990 S.. R5 2007 03 12 16 06 00 -14.2300 -170.5600 60.30 42.00 18.30 230261 SMO 2007 02 14 22 01 00 2730-99 S co CCGG 68.590 -999.990 S.. R5 2007 03 12 16 21 00 -14.2300 -170.5600 60.30 42.00 18.30 230262 SMO 2007 02 23 22 15 00 3417-99 G co CCGG 69.650 -999.990 ... R5 2007 03 22 15 17 00 -14.2300 -170.5600 47.00 42.00 5.00 230989 SMO 2007 02 23 22 15 00 3418-99 G co CCGG 71.030 -999.990 ... R5 2007 03 22 15 31 00 -14.2300 -170.5600 47.00 42.00 5.00 230990 SMO 2007 02 23 23 39 00 2799-99 S co CCGG 61.610 -999.990 S.. R5 2007 03 22 15 45 00 -14.2300 -170.5600 60.30 42.00 18.30 230993 SMO 2007 02 23 23 39 00 2800-99 S co CCGG 61.970 -999.990 S.. R5 2007 03 22 16 00 00 -14.2300 -170.5600 60.30 42.00 18.30 230994 SMO 2007 02 27 21 35 00 259-99 G co CCGG 72.160 -999.990 ... R5 2007 03 22 16 14 00 -14.2300 -170.5600 47.00 42.00 5.00 230988 SMO 2007 02 27 21 35 00 260-99 G co CCGG 70.890 -999.990 ... R5 2007 03 22 16 28 00 -14.2300 -170.5600 47.00 42.00 5.00 230987 SMO 2007 02 27 22 17 00 1813-99 S co CCGG 68.610 -999.990 S.. R5 2007 03 22 16 42 00 -14.2300 -170.5600 60.30 42.00 18.30 230991 SMO 2007 02 27 22 17 00 1814-99 S co CCGG 68.200 -999.990 S.. R5 2007 03 22 16 56 00 -14.2300 -170.5600 60.30 42.00 18.30 230992 SMO 2007 03 06 00 27 00 4031-99 S co CCGG 66.300 -999.990 S.. R5 2007 04 26 15 04 00 -14.2300 -170.5600 60.30 42.00 18.30 233082 SMO 2007 03 06 00 27 00 4032-99 S co CCGG 66.760 -999.990 S.. R5 2007 04 26 15 18 00 -14.2300 -170.5600 60.30 42.00 18.30 233083 SMO 2007 03 06 00 45 00 659-99 G co CCGG 69.590 -999.990 ... R5 2007 04 26 14 50 00 -14.2300 -170.5600 47.00 42.00 5.00 233081 SMO 2007 03 06 00 45 00 789-99 G co CCGG 70.060 -999.990 ... R5 2007 04 26 14 35 00 -14.2300 -170.5600 47.00 42.00 5.00 233080 SMO 2007 03 07 21 25 00 2867-99 S co CCGG 64.330 -999.990 S.. R5 2007 04 06 15 44 00 -14.2300 -170.5600 60.30 42.00 18.30 231730 SMO 2007 03 07 21 25 00 2868-99 S co CCGG 64.330 -999.990 S.. R5 2007 04 06 15 59 00 -14.2300 -170.5600 60.30 42.00 18.30 231731 SMO 2007 03 07 21 41 00 651-99 G co CCGG 70.190 -999.990 ... R5 2007 04 06 15 16 00 -14.2300 -170.5600 47.00 42.00 5.00 231732 SMO 2007 03 07 21 41 00 652-99 G co CCGG 70.810 -999.990 ... R5 2007 04 06 15 30 00 -14.2300 -170.5600 47.00 42.00 5.00 231733 SMO 2007 03 14 20 09 00 2313-99 G co CCGG 66.490 -999.990 ... R5 2007 04 09 14 30 00 -14.2300 -170.5600 47.00 42.00 5.00 231825 SMO 2007 03 14 20 09 00 2314-99 G co CCGG 66.980 -999.990 ... R5 2007 04 09 14 45 00 -14.2300 -170.5600 47.00 42.00 5.00 231826 SMO 2007 03 14 21 31 00 349-99 S co CCGG 63.800 -999.990 S.. R5 2007 04 09 14 02 00 -14.2300 -170.5600 60.30 42.00 18.30 231823 SMO 2007 03 14 21 31 00 350-99 S co CCGG 63.130 -999.990 S.. R5 2007 04 09 14 16 00 -14.2300 -170.5600 60.30 42.00 18.30 231824 SMO 2007 03 23 21 33 00 1859-99 G co CCGG 13.680 -999.990 A.C R5 2007 04 25 08 49 00 -14.2300 -170.5600 47.00 42.00 5.00 232783 SMO 2007 03 23 21 33 00 1859-99 G co CCGG 229.120 -999.990 A.. R5 2007 04 25 10 43 00 -14.2300 -170.5600 47.00 42.00 5.00 232783 SMO 2007 03 23 21 33 00 1860-99 G co CCGG 13.460 -999.990 A.C R5 2007 04 25 09 03 00 -14.2300 -170.5600 47.00 42.00 5.00 232784 SMO 2007 03 23 21 33 00 1860-99 G co CCGG 79.770 -999.990 A.. R5 2007 04 25 10 57 00 -14.2300 -170.5600 47.00 42.00 5.00 232784 SMO 2007 03 23 22 32 00 6493-66 S co CCGG 68.450 -999.990 S.. R5 2007 04 24 16 30 00 -14.2300 -170.5600 60.30 42.00 18.30 232781 SMO 2007 03 23 22 32 00 6494-66 S co CCGG 67.930 -999.990 S.. R5 2007 04 24 16 44 00 -14.2300 -170.5600 60.30 42.00 18.30 232782 SMO 2007 03 28 22 45 00 1391-99 G co CCGG 13.230 -999.990 A.C R5 2007 04 25 09 17 00 -14.2300 -170.5600 47.00 42.00 5.00 232785 SMO 2007 03 28 22 45 00 1391-99 G co CCGG 77.190 -999.990 A.. R5 2007 04 25 11 11 00 -14.2300 -170.5600 47.00 42.00 5.00 232785 SMO 2007 03 28 22 45 00 1392-99 G co CCGG 13.860 -999.990 A.C R5 2007 04 25 09 32 00 -14.2300 -170.5600 47.00 42.00 5.00 232786 SMO 2007 03 28 22 45 00 1392-99 G co CCGG 74.310 -999.990 A.. R5 2007 04 25 11 26 00 -14.2300 -170.5600 47.00 42.00 5.00 232786 SMO 2007 03 28 23 50 00 1937-99 S co CCGG 65.040 -999.990 S.. R5 2007 04 26 15 32 00 -14.2300 -170.5600 60.30 42.00 18.30 233084 SMO 2007 03 28 23 50 00 1938-99 S co CCGG 64.670 -999.990 S.. R5 2007 04 26 15 47 00 -14.2300 -170.5600 60.30 42.00 18.30 233085 SMO 2007 04 12 00 20 00 3235-99 G co CCGG 50.230 -999.990 ... R5 2007 05 09 15 36 00 -14.2300 -170.5600 47.00 42.00 5.00 233775 SMO 2007 04 12 00 20 00 3236-99 G co CCGG 49.860 -999.990 ... R5 2007 05 09 15 50 00 -14.2300 -170.5600 47.00 42.00 5.00 233776 SMO 2007 04 12 01 07 00 6111-66 S co CCGG 47.280 -999.990 S.. R5 2007 05 09 14 39 00 -14.2300 -170.5600 60.30 42.00 18.30 233773 SMO 2007 04 12 01 07 00 6596-66 S co CCGG 47.040 -999.990 S.. R5 2007 05 09 14 53 00 -14.2300 -170.5600 60.30 42.00 18.30 233774 SMO 2007 04 19 21 05 00 781-99 G co CCGG 61.990 -999.990 ... R6 2007 05 18 12 00 00 -14.2300 -170.5600 47.00 42.00 5.00 234095 SMO 2007 04 19 21 05 00 782-99 G co CCGG 62.400 -999.990 ... R6 2007 05 18 12 15 00 -14.2300 -170.5600 47.00 42.00 5.00 234096 SMO 2007 04 19 22 07 00 2621-99 S co CCGG 62.790 -999.990 S.. R5 2007 05 09 15 07 00 -14.2300 -170.5600 60.30 42.00 18.30 233771 SMO 2007 04 19 22 07 00 2622-99 S co CCGG 61.700 -999.990 S.. R5 2007 05 09 15 22 00 -14.2300 -170.5600 60.30 42.00 18.30 233772 SMO 2007 04 26 22 17 00 6023-66 G co CCGG 55.400 -999.990 ... R6 2007 05 18 11 03 00 -14.2300 -170.5600 47.00 42.00 5.00 234093 SMO 2007 04 26 22 17 00 6024-66 G co CCGG 56.810 -999.990 ... R6 2007 05 18 11 17 00 -14.2300 -170.5600 47.00 42.00 5.00 234094 SMO 2007 04 26 22 18 00 5-99 S co CCGG 52.190 -999.990 S.. R6 2007 05 18 12 30 00 -14.2300 -170.5600 60.30 42.00 18.30 234099 SMO 2007 04 26 22 18 00 6-99 S co CCGG 51.970 -999.990 S.. R6 2007 05 18 12 45 00 -14.2300 -170.5600 60.30 42.00 18.30 234100 SMO 2007 05 01 22 52 00 2385-99 G co CCGG 54.570 -999.990 ... R6 2007 05 18 11 32 00 -14.2300 -170.5600 47.00 42.00 5.00 234097 SMO 2007 05 01 22 52 00 2386-99 G co CCGG 54.280 -999.990 ... R6 2007 05 18 11 46 00 -14.2300 -170.5600 47.00 42.00 5.00 234098 SMO 2007 05 01 23 18 00 1141-99 S co CCGG 52.690 -999.990 S.. R6 2007 06 08 13 28 00 -14.2300 -170.5600 60.30 42.00 18.30 235324 SMO 2007 05 01 23 18 00 3312-99 S co CCGG 52.920 -999.990 S.. R6 2007 06 08 13 42 00 -14.2300 -170.5600 60.30 42.00 18.30 235325 SMO 2007 05 11 21 03 00 1656-99 G co CCGG 63.960 -999.990 ... R5 2007 06 08 15 06 00 -14.2300 -170.5600 47.00 42.00 5.00 235319 SMO 2007 05 11 21 03 00 387-99 G co CCGG 66.270 -999.990 ... R5 2007 06 08 14 52 00 -14.2300 -170.5600 47.00 42.00 5.00 235318 SMO 2007 05 11 22 37 00 6469-66 S co CCGG 61.330 -999.990 S.. R5 2007 06 08 13 55 00 -14.2300 -170.5600 60.30 42.00 18.30 235322 SMO 2007 05 11 22 37 00 6470-66 S co CCGG 61.320 -999.990 S.. R5 2007 06 08 14 09 00 -14.2300 -170.5600 60.30 42.00 18.30 235323 SMO 2007 05 16 22 02 00 695-99 G co CCGG 64.860 -999.990 ... R5 2007 06 18 15 52 00 -14.2300 -170.5600 47.00 42.00 5.00 235907 SMO 2007 05 16 22 02 00 696-99 G co CCGG 63.570 -999.990 ... R5 2007 06 18 16 06 00 -14.2300 -170.5600 47.00 42.00 5.00 235908 SMO 2007 05 16 23 25 00 2755-99 S co CCGG 60.840 -999.990 S.. R5 2007 06 08 14 23 00 -14.2300 -170.5600 60.30 42.00 18.30 235320 SMO 2007 05 16 23 25 00 2756-99 S co CCGG 61.350 -999.990 S.. R5 2007 06 08 14 37 00 -14.2300 -170.5600 60.30 42.00 18.30 235321 SMO 2007 05 25 20 04 00 3325-99 G co CCGG 60.290 -999.990 ... R5 2007 06 19 08 47 00 -14.2300 -170.5600 47.00 42.00 5.00 235905 SMO 2007 05 25 20 04 00 3326-99 G co CCGG 60.360 -999.990 ... R5 2007 06 19 09 01 00 -14.2300 -170.5600 47.00 42.00 5.00 235906 SMO 2007 05 25 21 36 00 6261-66 S co CCGG 58.500 -999.990 S.. R5 2007 06 18 15 24 00 -14.2300 -170.5600 60.30 42.00 18.30 235901 SMO 2007 05 25 21 36 00 6262-66 S co CCGG 58.450 -999.990 S.. R5 2007 06 18 15 38 00 -14.2300 -170.5600 60.30 42.00 18.30 235902 SMO 2007 05 30 20 41 00 3609-99 G co CCGG 57.350 -999.990 ... R5 2007 06 25 13 55 00 -14.2300 -170.5600 47.00 42.00 5.00 236311 SMO 2007 05 30 20 41 00 925-99 G co CCGG 57.360 -999.990 ... R5 2007 06 25 13 40 00 -14.2300 -170.5600 47.00 42.00 5.00 236310 SMO 2007 05 30 21 35 00 2911-99 S co CCGG 55.720 -999.990 S.. R5 2007 06 18 16 21 00 -14.2300 -170.5600 60.30 42.00 18.30 235903 SMO 2007 05 30 21 35 00 2912-99 S co CCGG 55.720 -999.990 S.. R5 2007 06 18 16 35 00 -14.2300 -170.5600 60.30 42.00 18.30 235904 SMO 2007 06 05 20 35 00 3508-99 S co CCGG 55.960 -999.990 S.. R5 2007 06 25 13 12 00 -14.2300 -170.5600 60.30 42.00 18.30 236312 SMO 2007 06 05 20 35 00 3700-99 S co CCGG 55.750 -999.990 S.. R5 2007 06 25 13 26 00 -14.2300 -170.5600 60.30 42.00 18.30 236313 SMO 2007 06 05 21 58 00 3677-99 G co CCGG 58.860 -999.990 ... R5 2007 07 05 11 46 00 -14.2300 -170.5600 47.00 42.00 5.00 237374 SMO 2007 06 05 21 58 00 3678-99 G co CCGG 59.730 -999.990 ... R5 2007 07 05 12 01 00 -14.2300 -170.5600 47.00 42.00 5.00 237375 SMO 2007 06 14 23 07 00 184-99 G co CCGG 59.710 -999.990 ... R6 2007 07 06 12 20 00 -14.2300 -170.5600 47.00 42.00 5.00 237745 SMO 2007 06 14 23 07 00 2744-99 G co CCGG 59.100 -999.990 ... R6 2007 07 06 12 34 00 -14.2300 -170.5600 47.00 42.00 5.00 237746 SMO 2007 06 15 01 38 00 2987-99 S co CCGG 59.990 -999.990 S.. R5 2007 07 03 15 30 00 -14.2300 -170.5600 60.30 42.00 18.30 237376 SMO 2007 06 15 01 38 00 2988-99 S co CCGG 58.010 -999.990 S.. R5 2007 07 03 15 44 00 -14.2300 -170.5600 60.30 42.00 18.30 237377 SMO 2007 06 21 21 02 00 3988-99 G co CCGG 57.880 -999.990 ... R6 2007 07 06 13 04 00 -14.2300 -170.5600 47.00 42.00 5.00 237744 SMO 2007 06 21 21 02 00 580-99 G co CCGG 58.130 -999.990 ... R6 2007 07 06 12 49 00 -14.2300 -170.5600 47.00 42.00 5.00 237743 SMO 2007 06 21 21 37 00 4023-99 S co CCGG 56.850 -999.990 S.. R5 2007 07 12 14 40 00 -14.2300 -170.5600 60.30 42.00 18.30 238155 SMO 2007 06 21 21 37 00 4024-99 S co CCGG 57.060 -999.990 S.. R5 2007 07 12 14 54 00 -14.2300 -170.5600 60.30 42.00 18.30 238156 SMO 2007 06 28 22 46 00 943-99 G co CCGG 58.870 -999.990 ... R5 2007 07 12 15 09 00 -14.2300 -170.5600 47.00 42.00 5.00 238153 SMO 2007 06 28 22 46 00 944-99 G co CCGG 59.990 -999.990 ... R5 2007 07 12 15 23 00 -14.2300 -170.5600 47.00 42.00 5.00 238154 SMO 2007 06 28 23 38 00 2445-99 S co CCGG 56.320 -999.990 S.. R5 2007 07 31 12 29 00 -14.2300 -170.5600 60.30 42.00 18.30 238976 SMO 2007 06 28 23 38 00 2446-99 S co CCGG 57.090 -999.990 S.. R5 2007 07 31 12 43 00 -14.2300 -170.5600 60.30 42.00 18.30 238977 SMO 2007 07 06 21 02 00 2395-99 G co CCGG 59.680 -999.990 ... R5 2007 07 31 12 00 00 -14.2300 -170.5600 47.00 42.00 5.00 238974 SMO 2007 07 06 21 02 00 2396-99 G co CCGG 60.430 -999.990 ... R5 2007 07 31 12 15 00 -14.2300 -170.5600 47.00 42.00 5.00 238975 SMO 2007 07 06 22 40 00 2371-99 S co CCGG 57.760 -999.990 S.. R5 2007 07 31 13 26 00 -14.2300 -170.5600 60.30 42.00 18.30 238980 SMO 2007 07 06 22 40 00 2372-99 S co CCGG 57.800 -999.990 S.. R5 2007 07 31 13 40 00 -14.2300 -170.5600 60.30 42.00 18.30 238981 SMO 2007 07 12 22 49 00 2667-99 G co CCGG 59.620 -999.990 ... R5 2007 08 02 13 02 00 -14.2300 -170.5600 47.00 42.00 5.00 239440 SMO 2007 07 12 22 49 00 2668-99 G co CCGG 59.330 -999.990 ... R5 2007 08 02 13 16 00 -14.2300 -170.5600 47.00 42.00 5.00 239441 SMO 2007 07 12 23 37 00 4417-99 S co CCGG 57.490 -999.990 S.. R5 2007 07 31 12 57 00 -14.2300 -170.5600 60.30 42.00 18.30 238978 SMO 2007 07 12 23 37 00 4418-99 S co CCGG 57.310 -999.990 S.. R5 2007 07 31 13 12 00 -14.2300 -170.5600 60.30 42.00 18.30 238979 SMO 2007 07 20 00 05 00 3713-99 G co CCGG 56.850 -999.990 ... R5 2007 08 02 11 08 00 -14.2300 -170.5600 47.00 42.00 5.00 239438 SMO 2007 07 20 00 05 00 3714-99 G co CCGG 56.460 -999.990 ... R5 2007 08 02 11 22 00 -14.2300 -170.5600 47.00 42.00 5.00 239439 SMO 2007 07 20 00 35 00 4773-99 S co CCGG 54.770 -999.990 S.. R5 2007 08 14 12 56 00 -14.2300 -170.5600 60.30 42.00 18.30 239857 SMO 2007 07 20 00 35 00 4774-99 S co CCGG 54.940 -999.990 S.. R5 2007 08 14 13 10 00 -14.2300 -170.5600 60.30 42.00 18.30 239858 SMO 2007 07 27 00 06 00 1453-99 G co CCGG 59.500 -999.990 ... R5 2007 08 20 15 26 00 -14.2300 -170.5600 47.00 42.00 5.00 240190 SMO 2007 07 27 00 06 00 1454-99 G co CCGG 59.800 -999.990 ... R5 2007 08 20 15 40 00 -14.2300 -170.5600 47.00 42.00 5.00 240191 SMO 2007 07 27 01 39 00 843-99 S co CCGG 56.290 -999.990 S.. R5 2007 08 14 13 25 00 -14.2300 -170.5600 60.30 42.00 18.30 239855 SMO 2007 07 27 01 39 00 844-99 S co CCGG 56.590 -999.990 S.. R5 2007 08 14 13 39 00 -14.2300 -170.5600 60.30 42.00 18.30 239856 SMO 2007 08 02 21 24 00 4771-99 G co CCGG 59.830 -999.990 ... R5 2007 08 20 14 57 00 -14.2300 -170.5600 47.00 42.00 5.00 240188 SMO 2007 08 02 21 24 00 4772-99 G co CCGG 59.330 -999.990 ... R5 2007 08 20 15 12 00 -14.2300 -170.5600 47.00 42.00 5.00 240189 SMO 2007 08 02 22 41 00 6215-66 S co CCGG 57.830 -999.990 S.. R5 2007 08 20 16 23 00 -14.2300 -170.5600 60.30 42.00 18.30 240194 SMO 2007 08 02 22 41 00 6216-66 S co CCGG 57.750 -999.990 S.. R5 2007 08 20 16 37 00 -14.2300 -170.5600 60.30 42.00 18.30 240195 SMO 2007 08 09 00 40 00 2935-99 S co CCGG 56.550 -999.990 S.. R5 2007 08 20 15 54 00 -14.2300 -170.5600 60.30 42.00 18.30 240192 SMO 2007 08 09 00 40 00 2936-99 S co CCGG 56.800 -999.990 S.. R5 2007 08 20 16 09 00 -14.2300 -170.5600 60.30 42.00 18.30 240193 SMO 2007 08 09 01 00 00 4055-99 G co CCGG 58.850 -999.990 ... R5 2007 09 06 12 19 00 -14.2300 -170.5600 47.00 42.00 5.00 240849 SMO 2007 08 09 01 00 00 4056-99 G co CCGG 61.670 -999.990 ... R5 2007 09 06 12 33 00 -14.2300 -170.5600 47.00 42.00 5.00 240850 SMO 2007 08 16 00 15 00 241-99 G co CCGG 56.120 -999.990 ... R5 2007 09 04 17 05 00 -14.2300 -170.5600 47.00 42.00 5.00 240851 SMO 2007 08 16 00 15 00 242-99 G co CCGG 55.680 -999.990 ... R5 2007 09 04 17 19 00 -14.2300 -170.5600 47.00 42.00 5.00 240852 SMO 2007 08 16 01 25 00 1074-99 S co CCGG 54.930 -999.990 S.. R5 2007 09 06 11 51 00 -14.2300 -170.5600 60.30 42.00 18.30 240847 SMO 2007 08 16 01 25 00 734-99 S co CCGG 54.420 -999.990 S.. R5 2007 09 06 12 05 00 -14.2300 -170.5600 60.30 42.00 18.30 240848 SMO 2007 08 23 00 30 00 4617-99 G co CCGG 61.340 -999.990 ... R5 2007 09 24 15 20 00 -14.2300 -170.5600 47.00 42.00 5.00 242077 SMO 2007 08 23 00 30 00 4618-99 G co CCGG 61.260 -999.990 ... R5 2007 09 24 15 35 00 -14.2300 -170.5600 47.00 42.00 5.00 242078 SMO 2007 08 23 12 34 56 4855-99 S co CCGG 59.370 -999.990 S.. R5 2007 09 24 14 52 00 -14.2300 -170.5600 60.30 42.00 18.30 242081 SMO 2007 08 23 12 34 56 4856-99 S co CCGG 59.460 -999.990 S.. R5 2007 09 24 15 06 00 -14.2300 -170.5600 60.30 42.00 18.30 242082 SMO 2007 08 29 20 41 00 2281-99 S co CCGG 58.820 -999.990 S.. R5 2007 09 24 15 49 00 -14.2300 -170.5600 60.30 42.00 18.30 242079 SMO 2007 08 29 20 41 00 2282-99 S co CCGG 59.210 -999.990 S.. R5 2007 09 24 16 03 00 -14.2300 -170.5600 60.30 42.00 18.30 242080 SMO 2007 08 29 22 40 00 2477-99 G co CCGG 62.130 -999.990 ... R5 2007 09 24 14 23 00 -14.2300 -170.5600 47.00 42.00 5.00 242075 SMO 2007 08 29 22 40 00 2478-99 G co CCGG 61.190 -999.990 ... R5 2007 09 24 14 38 00 -14.2300 -170.5600 47.00 42.00 5.00 242076 SMO 2007 09 06 22 35 00 1067-99 G co CCGG 65.290 -999.990 ... R5 2007 09 28 11 36 00 -14.2300 -170.5600 47.00 42.00 5.00 242546 SMO 2007 09 06 22 35 00 1068-99 G co CCGG 64.870 -999.990 ... R5 2007 09 28 11 50 00 -14.2300 -170.5600 47.00 42.00 5.00 242547 SMO 2007 09 06 23 41 00 3079-99 S co CCGG 62.760 -999.990 S.. R5 2007 09 21 10 33 00 -14.2300 -170.5600 60.30 42.00 18.30 242083 SMO 2007 09 06 23 41 00 3080-99 S co CCGG 62.410 -999.990 S.. R5 2007 09 21 10 47 00 -14.2300 -170.5600 60.30 42.00 18.30 242084 SMO 2007 09 13 01 44 00 1465-99 S co CCGG 63.220 -999.990 S.. R5 2007 10 11 11 57 00 -14.2300 -170.5600 60.30 42.00 18.30 243041 SMO 2007 09 13 01 44 00 1466-99 S co CCGG 63.060 -999.990 S.. R5 2007 10 11 12 11 00 -14.2300 -170.5600 60.30 42.00 18.30 243042 SMO 2007 09 13 02 30 00 4857-99 G co CCGG 65.590 -999.990 ... R5 2007 09 28 12 05 00 -14.2300 -170.5600 47.00 42.00 5.00 242548 SMO 2007 09 13 02 30 00 4858-99 G co CCGG 65.600 -999.990 ... R5 2007 09 28 12 19 00 -14.2300 -170.5600 47.00 42.00 5.00 242549 SMO 2007 09 25 21 41 00 740-99 S co CCGG 66.840 -999.990 S.. R5 2007 10 11 11 29 00 -14.2300 -170.5600 60.30 42.00 18.30 243043 SMO 2007 09 25 21 41 00 745-99 S co CCGG 67.110 -999.990 S.. R5 2007 10 11 11 43 00 -14.2300 -170.5600 60.30 42.00 18.30 243044 SMO 2007 09 25 22 35 00 2779-99 G co CCGG 73.210 -999.990 ... R5 2007 10 15 11 02 00 -14.2300 -170.5600 47.00 42.00 5.00 243165 SMO 2007 09 25 22 35 00 2780-99 G co CCGG 71.270 -999.990 ... R5 2007 10 15 11 16 00 -14.2300 -170.5600 47.00 42.00 5.00 243166 SMO 2007 10 03 22 41 00 1043-99 S co CCGG 68.940 -999.990 S.. R5 2007 10 15 11 30 00 -14.2300 -170.5600 60.30 42.00 18.30 243163 SMO 2007 10 03 22 41 00 1044-99 S co CCGG 68.910 -999.990 S.. R5 2007 10 15 11 44 00 -14.2300 -170.5600 60.30 42.00 18.30 243164 SMO 2007 10 11 00 50 00 6035-66 G co CCGG 72.050 -999.990 ... R5 2007 10 22 09 45 00 -14.2300 -170.5600 47.00 42.00 5.00 243641 SMO 2007 10 11 00 50 00 6036-66 G co CCGG 71.340 -999.990 ... R5 2007 10 22 10 00 00 -14.2300 -170.5600 47.00 42.00 5.00 243642 SMO 2007 10 11 01 41 00 6903-66 S co CCGG 69.940 -999.990 S.. R5 2007 10 22 11 11 00 -14.2300 -170.5600 60.30 42.00 18.30 243639 SMO 2007 10 11 01 41 00 6904-66 S co CCGG 69.650 -999.990 S.. R5 2007 10 22 11 25 00 -14.2300 -170.5600 60.30 42.00 18.30 243640 SMO 2007 10 18 22 25 00 1365-99 G co CCGG 79.190 -999.990 ... R5 2007 11 06 15 22 00 -14.2300 -170.5600 47.00 42.00 5.00 244498 SMO 2007 10 18 22 25 00 3369-99 G co CCGG 78.760 -999.990 ... R5 2007 11 06 15 37 00 -14.2300 -170.5600 47.00 42.00 5.00 244499 SMO 2007 10 18 23 40 00 1432-99 S co CCGG 75.470 -999.990 S.. R5 2007 11 06 16 05 00 -14.2300 -170.5600 60.30 42.00 18.30 244495 SMO 2007 10 18 23 40 00 2543-99 S co CCGG 75.360 -999.990 S.. R5 2007 11 06 15 51 00 -14.2300 -170.5600 60.30 42.00 18.30 244494 SMO 2007 10 23 21 06 00 2867-99 G co CCGG 75.760 -999.990 ... R5 2007 11 06 14 26 00 -14.2300 -170.5600 47.00 42.00 5.00 244496 SMO 2007 10 23 21 06 00 2868-99 G co CCGG 75.700 -999.990 ... R5 2007 11 06 14 40 00 -14.2300 -170.5600 47.00 42.00 5.00 244497 SMO 2007 10 23 22 40 00 4521-99 S co CCGG 72.010 -999.990 S.. R5 2007 11 06 14 54 00 -14.2300 -170.5600 60.30 42.00 18.30 244492 SMO 2007 10 23 22 40 00 4522-99 S co CCGG 72.070 -999.990 S.. R5 2007 11 06 15 08 00 -14.2300 -170.5600 60.30 42.00 18.30 244493 SMO 2007 10 31 22 06 00 6509-66 G co CCGG 85.350 -999.990 P.. R5 2007 11 15 09 40 00 -14.2300 -170.5600 47.00 42.00 5.00 244847 SMO 2007 10 31 22 06 00 6510-66 G co CCGG 80.450 -999.990 P.. R5 2007 11 15 09 54 00 -14.2300 -170.5600 47.00 42.00 5.00 244848 SMO 2007 10 31 23 41 00 6345-66 S co CCGG 76.990 -999.990 S.. R5 2007 11 15 10 08 00 -14.2300 -170.5600 60.30 42.00 18.30 244849 SMO 2007 10 31 23 41 00 6346-66 S co CCGG 76.930 -999.990 S.. R5 2007 11 15 10 23 00 -14.2300 -170.5600 60.30 42.00 18.30 244850 SMO 2007 11 06 22 00 00 285-99 G co CCGG 71.150 -999.990 ... R5 2007 11 27 10 44 00 -14.2300 -170.5600 47.00 42.00 5.00 245298 SMO 2007 11 06 22 00 00 286-99 G co CCGG 71.410 -999.990 ... R5 2007 11 27 10 58 00 -14.2300 -170.5600 47.00 42.00 5.00 245299 SMO 2007 11 06 23 41 00 1935-99 S co CCGG 67.060 -999.990 S.. R5 2007 11 27 11 13 00 -14.2300 -170.5600 60.30 42.00 18.30 245300 SMO 2007 11 06 23 41 00 1936-99 S co CCGG 67.170 -999.990 S.. R5 2007 11 27 11 27 00 -14.2300 -170.5600 60.30 42.00 18.30 245301 SMO 2007 11 16 20 28 00 539-99 G co CCGG 67.700 -999.990 ... R5 2007 12 07 12 24 00 -14.2300 -170.5600 47.00 42.00 5.00 245881 SMO 2007 11 16 20 28 00 540-99 G co CCGG 68.290 -999.990 ... R5 2007 12 07 12 38 00 -14.2300 -170.5600 47.00 42.00 5.00 245882 SMO 2007 11 16 21 40 00 1583-99 S co CCGG 64.530 -999.990 S.. R5 2007 12 07 12 52 00 -14.2300 -170.5600 60.30 42.00 18.30 245879 SMO 2007 11 16 21 40 00 1584-99 S co CCGG 64.530 -999.990 S.. R5 2007 12 07 13 06 00 -14.2300 -170.5600 60.30 42.00 18.30 245880 SMO 2007 11 21 21 49 00 3079-99 G co CCGG 67.900 -999.990 ... R5 2007 12 14 11 22 00 -14.2300 -170.5600 47.00 42.00 5.00 246133 SMO 2007 11 21 21 49 00 3080-99 G co CCGG 66.940 -999.990 ... R5 2007 12 14 11 37 00 -14.2300 -170.5600 47.00 42.00 5.00 246134 SMO 2007 11 21 22 40 00 3011-99 S co CCGG 65.230 -999.990 S.. R5 2007 12 14 13 16 00 -14.2300 -170.5600 60.30 42.00 18.30 246131 SMO 2007 11 21 22 40 00 3012-99 S co CCGG 64.900 -999.990 S.. R5 2007 12 14 13 30 00 -14.2300 -170.5600 60.30 42.00 18.30 246132 SMO 2007 11 28 22 30 00 1775-99 G co CCGG 65.490 -999.990 ... R5 2007 12 13 12 52 00 -14.2300 -170.5600 47.00 42.00 5.00 246236 SMO 2007 11 28 22 30 00 1776-99 G co CCGG 64.960 -999.990 ... R5 2007 12 13 13 06 00 -14.2300 -170.5600 47.00 42.00 5.00 246237 SMO 2007 11 28 23 40 00 6665-66 S co CCGG 61.420 -999.990 S.. R5 2007 12 13 12 24 00 -14.2300 -170.5600 60.30 42.00 18.30 246238 SMO 2007 11 28 23 40 00 6666-66 S co CCGG 61.820 -999.990 S.. R5 2007 12 13 12 38 00 -14.2300 -170.5600 60.30 42.00 18.30 246239 SMO 2007 12 04 21 00 00 2889-99 G co CCGG 72.460 -999.990 ... R5 2008 01 09 12 00 00 -14.2300 -170.5600 47.00 42.00 5.00 247224 SMO 2007 12 04 21 00 00 2890-99 G co CCGG 71.810 -999.990 ... R5 2008 01 09 12 15 00 -14.2300 -170.5600 47.00 42.00 5.00 247225 SMO 2007 12 04 21 40 00 4199-99 S co CCGG 69.350 -999.990 S.. R5 2008 01 09 11 32 00 -14.2300 -170.5600 60.30 42.00 18.30 247222 SMO 2007 12 04 21 40 00 4200-99 S co CCGG 68.690 -999.990 S.. R5 2008 01 09 11 46 00 -14.2300 -170.5600 60.30 42.00 18.30 247223 SMO 2007 12 13 22 40 00 1147-99 S co CCGG 56.920 -999.990 S.. R5 2008 01 16 15 26 00 -14.2300 -170.5600 60.30 42.00 18.30 247604 SMO 2007 12 13 22 40 00 3368-99 S co CCGG 56.890 -999.990 S.. R5 2008 01 16 15 41 00 -14.2300 -170.5600 60.30 42.00 18.30 247605 SMO 2007 12 13 23 00 00 1766-99 G co CCGG 61.120 -999.990 ... R5 2008 01 16 14 58 00 -14.2300 -170.5600 47.00 42.00 5.00 247606 SMO 2007 12 13 23 00 00 2545-99 G co CCGG 59.950 -999.990 ... R5 2008 01 16 15 12 00 -14.2300 -170.5600 47.00 42.00 5.00 247607 SMO 2007 12 19 22 40 00 3413-99 S co CCGG 54.680 -999.990 S.. R5 2008 01 15 10 50 00 -14.2300 -170.5600 60.30 42.00 18.30 247636 SMO 2007 12 19 22 40 00 3414-99 S co CCGG 54.810 -999.990 S.. R5 2008 01 15 11 04 00 -14.2300 -170.5600 60.30 42.00 18.30 247637 SMO 2007 12 19 23 40 00 3111-99 G co CCGG 58.120 -999.990 ... R5 2008 01 15 10 21 00 -14.2300 -170.5600 47.00 42.00 5.00 247638 SMO 2007 12 19 23 40 00 3112-99 G co CCGG 57.350 -999.990 ... R5 2008 01 15 10 36 00 -14.2300 -170.5600 47.00 42.00 5.00 247639 SMO 2007 12 27 20 50 00 6565-66 G co CCGG 56.960 -999.990 ... V2 2008 01 23 11 53 00 -14.2300 -170.5700 47.00 42.00 5.00 248095 SMO 2007 12 27 20 50 00 6566-66 G co CCGG 56.680 -999.990 ... V2 2008 01 23 12 08 00 -14.2300 -170.5700 47.00 42.00 5.00 248096 SMO 2007 12 27 21 40 00 31-99 S co CCGG 54.730 -999.990 S.. V2 2008 01 23 12 24 00 -14.2300 -170.5700 60.30 42.00 18.30 248093 SMO 2007 12 27 21 40 00 32-99 S co CCGG 54.750 -999.990 S.. V2 2008 01 23 12 39 00 -14.2300 -170.5700 60.30 42.00 18.30 248094 SMO 2008 01 03 00 15 00 3257-99 G co CCGG 64.500 -999.990 ... V2 2008 01 24 14 11 00 -14.2300 -170.5700 47.00 42.00 5.00 248198 SMO 2008 01 03 00 15 00 69-99 G co CCGG 64.240 -999.990 ... V2 2008 01 24 13 56 00 -14.2300 -170.5700 47.00 42.00 5.00 248197 SMO 2008 01 03 01 40 00 1887-99 S co CCGG 60.510 -999.990 S.. R5 2008 01 24 14 05 00 -14.2300 -170.5700 60.30 42.00 18.30 248199 SMO 2008 01 03 01 40 00 2866-99 S co CCGG 60.450 -999.990 S.. R5 2008 01 24 14 19 00 -14.2300 -170.5700 60.30 42.00 18.30 248200 SMO 2008 01 10 21 09 00 2987-99 G co CCGG 69.290 -999.990 ... R5 2008 02 04 11 40 00 -14.2300 -170.5700 47.00 42.00 5.00 248777 SMO 2008 01 10 21 09 00 2988-99 G co CCGG 67.880 -999.990 ... R5 2008 02 04 11 55 00 -14.2300 -170.5700 47.00 42.00 5.00 248778 SMO 2008 01 10 21 40 00 1575-99 S co CCGG 66.360 -999.990 S.. R5 2008 02 04 12 09 00 -14.2300 -170.5700 60.30 42.00 18.30 248775 SMO 2008 01 10 21 40 00 1576-99 S co CCGG 66.420 -999.990 S.. R5 2008 02 04 12 23 00 -14.2300 -170.5700 60.30 42.00 18.30 248776 SMO 2008 01 18 22 05 00 629-99 G co CCGG 66.190 -999.990 ... V2 2008 02 14 08 48 00 -14.2300 -170.5700 47.00 42.00 5.00 249291 SMO 2008 01 18 22 05 00 630-99 G co CCGG 65.250 -999.990 ... V2 2008 02 14 09 04 00 -14.2300 -170.5700 47.00 42.00 5.00 249292 SMO 2008 01 18 23 40 00 249-99 S co CCGG 60.190 -999.990 S.. R5 2008 02 14 12 04 00 -14.2300 -170.5700 60.30 42.00 18.30 249287 SMO 2008 01 18 23 40 00 250-99 S co CCGG 60.360 -999.990 S.. R5 2008 02 14 12 19 00 -14.2300 -170.5700 60.30 42.00 18.30 249288 SMO 2008 01 25 21 50 00 6413-66 G co CCGG 67.120 -999.990 ... R5 2008 02 14 13 01 00 -14.2300 -170.5700 47.00 42.00 5.00 249293 SMO 2008 01 25 21 50 00 6414-66 G co CCGG 67.000 -999.990 ... R5 2008 02 14 13 16 00 -14.2300 -170.5700 47.00 42.00 5.00 249294 SMO 2008 01 25 22 40 00 3255-99 S co CCGG 65.420 -999.990 S.. R5 2008 02 14 12 33 00 -14.2300 -170.5700 60.30 42.00 18.30 249289 SMO 2008 01 25 22 40 00 3256-99 S co CCGG 65.470 -999.990 S.. R5 2008 02 14 12 47 00 -14.2300 -170.5700 60.30 42.00 18.30 249290 SMO 2008 01 30 00 40 00 6397-66 S co CCGG 55.870 -999.990 S.. V2 2008 02 14 11 25 00 -14.2300 -170.5700 60.30 42.00 18.30 249283 SMO 2008 01 30 00 40 00 6398-66 S co CCGG 54.650 -999.990 S.. V2 2008 02 14 11 40 00 -14.2300 -170.5700 60.30 42.00 18.30 249284 SMO 2008 01 30 01 05 00 2797-99 G co CCGG 58.870 -999.990 ... V2 2008 02 14 12 26 00 -14.2300 -170.5700 47.00 42.00 5.00 249285 SMO 2008 01 30 01 05 00 2798-99 G co CCGG 58.330 -999.990 ... V2 2008 02 14 12 42 00 -14.2300 -170.5700 47.00 42.00 5.00 249286 SMO 2008 02 07 20 45 00 3443-99 S co CCGG 60.560 -999.990 S.. V2 2008 02 28 16 22 00 -14.2300 -170.5700 60.30 42.00 18.30 250061 SMO 2008 02 07 20 45 00 3444-99 S co CCGG 58.540 -999.990 S.. V2 2008 02 28 16 37 00 -14.2300 -170.5700 60.30 42.00 18.30 250062 SMO 2008 02 07 22 00 00 6501-66 G co CCGG 61.960 -999.990 ... R5 2008 02 28 12 58 00 -14.2300 -170.5700 47.00 42.00 5.00 250059 SMO 2008 02 07 22 00 00 6502-66 G co CCGG 62.450 -999.990 ... R5 2008 02 28 13 13 00 -14.2300 -170.5700 47.00 42.00 5.00 250060 SMO 2008 02 14 21 41 00 4281-99 G co CCGG 60.960 -999.990 ... V2 2008 03 11 15 07 00 -14.2300 -170.5700 47.00 42.00 5.00 250705 SMO 2008 02 14 21 41 00 4282-99 G co CCGG 60.650 -999.990 ... V2 2008 03 11 15 22 00 -14.2300 -170.5700 47.00 42.00 5.00 250706 SMO 2008 02 14 22 41 00 6345-66 S co CCGG 58.240 -999.990 S.. V2 2008 03 11 14 36 00 -14.2300 -170.5700 60.30 42.00 18.30 250707 SMO 2008 02 14 22 41 00 6346-66 S co CCGG 58.080 -999.990 S.. V2 2008 03 11 14 51 00 -14.2300 -170.5700 60.30 42.00 18.30 250708 SMO 2008 02 19 21 13 00 6701-66 G co CCGG 58.850 -999.990 ... V2 2008 03 07 14 17 00 -14.2300 -170.5700 47.00 42.00 5.00 250542 SMO 2008 02 19 21 13 00 6702-66 G co CCGG 58.240 -999.990 ... V2 2008 03 07 14 32 00 -14.2300 -170.5700 47.00 42.00 5.00 250543 SMO 2008 02 19 21 40 00 4977-99 S co CCGG 56.120 -999.990 S.. V2 2008 03 07 13 46 00 -14.2300 -170.5700 60.30 42.00 18.30 250540 SMO 2008 02 19 21 40 00 4978-99 S co CCGG 55.350 -999.990 S.. V2 2008 03 07 14 01 00 -14.2300 -170.5700 60.30 42.00 18.30 250541 SMO 2008 02 27 21 40 00 371-99 S co CCGG 46.890 -999.990 S.. V2 2008 03 12 13 06 00 -14.2300 -170.5700 60.30 42.00 18.30 250826 SMO 2008 02 27 21 40 00 372-99 S co CCGG 46.550 -999.990 S.. V2 2008 03 12 13 22 00 -14.2300 -170.5700 60.30 42.00 18.30 250827 SMO 2008 02 27 22 10 00 2327-99 G co CCGG 49.710 -999.990 ... V2 2008 03 12 11 34 00 -14.2300 -170.5700 47.00 42.00 5.00 250824 SMO 2008 02 27 22 10 00 2328-99 G co CCGG 49.480 -999.990 ... V2 2008 03 12 11 50 00 -14.2300 -170.5700 47.00 42.00 5.00 250825 SMO 2008 03 06 20 51 00 3725-99 G co CCGG 51.500 -999.990 ... R5 2008 03 27 09 47 00 -14.2300 -170.5700 47.00 42.00 5.00 251602 SMO 2008 03 06 20 51 00 3726-99 G co CCGG 52.370 -999.990 ... R5 2008 03 27 10 01 00 -14.2300 -170.5700 47.00 42.00 5.00 251603 SMO 2008 03 06 21 40 00 3163-99 S co CCGG 49.750 -999.990 S.. R5 2008 03 27 10 16 00 -14.2300 -170.5700 60.30 42.00 18.30 251600 SMO 2008 03 06 21 40 00 3164-99 S co CCGG 49.970 -999.990 S.. R5 2008 03 27 10 30 00 -14.2300 -170.5700 60.30 42.00 18.30 251601 SMO 2008 03 12 21 43 00 2149-99 G co CCGG 61.550 -999.990 ... R5 2008 03 26 11 39 00 -14.2300 -170.5700 47.00 42.00 5.00 251513 SMO 2008 03 12 21 43 00 2150-99 G co CCGG 61.170 -999.990 ... R5 2008 03 26 11 53 00 -14.2300 -170.5700 47.00 42.00 5.00 251514 SMO 2008 03 12 22 40 00 6605-66 S co CCGG 58.650 -999.990 S.. R5 2008 03 26 11 11 00 -14.2300 -170.5700 60.30 42.00 18.30 251511 SMO 2008 03 12 22 40 00 6606-66 S co CCGG 58.160 -999.990 S.. R5 2008 03 26 11 25 00 -14.2300 -170.5700 60.30 42.00 18.30 251512 SMO 2008 03 18 21 08 00 1745-99 G co CCGG 51.040 -999.990 ... R5 2008 04 02 15 32 00 -14.2300 -170.5700 47.00 42.00 5.00 251793 SMO 2008 03 18 21 08 00 1746-99 G co CCGG 52.190 -999.990 ... R5 2008 04 02 15 46 00 -14.2300 -170.5700 47.00 42.00 5.00 251794 SMO 2008 03 18 23 39 00 2499-99 S co CCGG 47.120 -999.990 S.. R5 2008 04 02 15 04 00 -14.2300 -170.5700 60.30 42.00 18.30 251791 SMO 2008 03 18 23 39 00 2500-99 S co CCGG 47.300 -999.990 S.. R5 2008 04 02 15 18 00 -14.2300 -170.5700 60.30 42.00 18.30 251792 SMO 2008 03 26 20 07 00 4127-99 G co CCGG 50.510 -999.990 ... R5 2008 04 14 11 06 00 -14.2300 -170.5700 47.00 42.00 5.00 252279 SMO 2008 03 26 20 07 00 4128-99 G co CCGG 50.800 -999.990 ... R5 2008 04 14 11 21 00 -14.2300 -170.5700 47.00 42.00 5.00 252280 SMO 2008 03 26 22 36 00 1609-99 S co CCGG 73.660 -999.990 S.. R5 2008 04 14 10 38 00 -14.2300 -170.5700 60.30 42.00 18.30 252277 SMO 2008 03 26 22 36 00 1610-99 S co CCGG 47.740 -999.990 S.. R5 2008 04 14 10 52 00 -14.2300 -170.5700 60.30 42.00 18.30 252278 SMO 2008 04 03 21 50 00 3055-99 G co CCGG 62.020 -999.990 ... R5 2008 04 25 12 56 00 -14.2300 -170.5700 47.00 42.00 5.00 253063 SMO 2008 04 03 21 50 00 3056-99 G co CCGG 62.090 -999.990 ... R5 2008 04 25 13 10 00 -14.2300 -170.5700 47.00 42.00 5.00 253064 SMO 2008 04 03 22 39 00 3581-99 S co CCGG 64.730 -999.990 S.. V2 2008 05 05 10 27 00 -14.2300 -170.5700 60.30 42.00 18.30 253461 SMO 2008 04 03 22 39 00 3582-99 S co CCGG 60.410 -999.990 S.. V2 2008 05 05 10 42 00 -14.2300 -170.5700 60.30 42.00 18.30 253462 SMO 2008 04 10 21 40 00 255-99 G co CCGG 50.580 -999.990 ... R5 2008 05 05 11 41 00 -14.2300 -170.5700 47.00 42.00 5.00 253459 SMO 2008 04 10 21 40 00 256-99 G co CCGG 50.230 -999.990 ... R5 2008 05 05 11 55 00 -14.2300 -170.5700 47.00 42.00 5.00 253460 SMO 2008 04 10 22 40 00 2477-99 S co CCGG 50.520 -999.990 S.. V2 2008 05 08 10 27 00 -14.2400 -170.5700 60.30 42.00 18.30 253892 SMO 2008 04 10 22 40 00 2478-99 S co CCGG 49.410 -999.990 S.. V2 2008 05 08 10 42 00 -14.2400 -170.5700 60.30 42.00 18.30 253893 SMO 2008 04 17 22 40 00 4356-99 G co CCGG 51.910 -999.990 ... R5 2008 05 06 14 46 00 -14.2400 -170.5700 47.00 42.00 5.00 253735 SMO 2008 04 17 22 40 00 4396-99 G co CCGG 52.340 -999.990 ... R5 2008 05 06 15 00 00 -14.2400 -170.5700 47.00 42.00 5.00 253736 SMO 2008 04 17 23 40 00 4311-99 S co CCGG 53.150 -999.990 S.. V2 2008 05 08 10 58 00 -14.2400 -170.5700 60.30 42.00 18.30 253894 SMO 2008 04 17 23 40 00 4312-99 S co CCGG 53.320 -999.990 S.. V2 2008 05 08 11 13 00 -14.2400 -170.5700 60.30 42.00 18.30 253895 SMO 2008 04 23 22 40 00 352-99 S co CCGG 46.840 -999.990 S.. R5 2008 05 06 14 17 00 -14.2400 -170.5700 60.30 42.00 18.30 253737 SMO 2008 04 23 22 40 00 4278-99 S co CCGG 46.510 -999.990 S.. R5 2008 05 06 14 31 00 -14.2400 -170.5700 60.30 42.00 18.30 253738 SMO 2008 04 23 23 25 00 107-99 G co CCGG 50.190 -999.990 ... V2 2008 05 21 13 25 00 -14.2400 -170.5700 47.00 42.00 5.00 254507 SMO 2008 04 23 23 25 00 4591-99 G co CCGG 49.830 -999.990 ... V2 2008 05 21 13 40 00 -14.2400 -170.5700 47.00 42.00 5.00 254508 SMO 2008 05 01 22 21 00 2263-99 G co CCGG 63.170 -999.990 ... V2 2008 05 22 11 54 00 -14.2400 -170.5700 47.00 42.00 5.00 254509 SMO 2008 05 01 22 21 00 2264-99 G co CCGG 62.750 -999.990 ... V2 2008 05 22 12 09 00 -14.2400 -170.5700 47.00 42.00 5.00 254510 SMO 2008 05 02 00 39 00 162-99 S co CCGG 58.250 -999.990 S.. V2 2008 05 21 14 27 00 -14.2400 -170.5700 60.30 42.00 18.30 254505 SMO 2008 05 02 00 39 00 813-99 S co CCGG 57.470 -999.990 S.. V2 2008 05 21 14 42 00 -14.2400 -170.5700 60.30 42.00 18.30 254506 SMO 2008 05 06 22 18 00 3437-99 G co CCGG 54.490 -999.990 ... V2 2008 05 22 12 24 00 -14.2400 -170.5700 47.00 42.00 5.00 254511 SMO 2008 05 06 22 18 00 4173-99 G co CCGG 55.320 -999.990 ... V2 2008 05 22 12 40 00 -14.2400 -170.5700 47.00 42.00 5.00 254512 SMO 2008 05 06 23 38 00 3741-99 S co CCGG 52.210 -999.990 S.. V2 2008 06 02 14 20 00 -14.2400 -170.5700 60.30 42.00 18.30 254913 SMO 2008 05 06 23 38 00 3742-99 S co CCGG 51.510 -999.990 S.. V2 2008 06 02 14 35 00 -14.2400 -170.5700 60.30 42.00 18.30 254914 SMO 2008 05 13 20 38 00 2541-99 S co CCGG 57.200 -999.990 S.. V2 2008 06 13 14 55 00 -14.2400 -170.5700 60.30 42.00 18.30 255545 SMO 2008 05 13 20 38 00 2542-99 S co CCGG 56.980 -999.990 S.. V2 2008 06 13 15 10 00 -14.2400 -170.5700 60.30 42.00 18.30 255546 SMO 2008 05 13 20 52 00 2799-99 G co CCGG 61.350 -999.990 ... V2 2008 06 02 14 51 00 -14.2400 -170.5700 47.00 42.00 5.00 254912 SMO 2008 05 13 20 52 00 3337-99 G co CCGG 60.990 -999.990 ... V2 2008 06 02 15 07 00 -14.2400 -170.5700 47.00 42.00 5.00 254911 SMO 2008 05 22 21 21 00 1125-99 G co CCGG 61.300 -999.990 ... V2 2008 06 16 12 27 00 -14.2400 -170.5700 47.00 42.00 5.00 255541 SMO 2008 05 22 21 21 00 1126-99 G co CCGG 62.080 -999.990 ... V2 2008 06 16 12 42 00 -14.2400 -170.5700 47.00 42.00 5.00 255542 SMO 2008 05 22 21 38 00 3693-99 S co CCGG 57.440 -999.990 S.. V2 2008 06 13 14 24 00 -14.2400 -170.5700 60.30 42.00 18.30 255547 SMO 2008 05 22 21 38 00 3694-99 S co CCGG 57.060 -999.990 S.. V2 2008 06 13 14 40 00 -14.2400 -170.5700 60.30 42.00 18.30 255548 SMO 2008 05 28 21 20 00 4183-99 G co CCGG 58.010 -999.990 ... V2 2008 06 16 10 54 00 -14.2400 -170.5700 47.00 42.00 5.00 255543 SMO 2008 05 28 21 20 00 623-99 G co CCGG 57.260 -999.990 ... V2 2008 06 16 11 09 00 -14.2400 -170.5700 47.00 42.00 5.00 255544 SMO 2008 05 28 22 39 00 4905-99 S co CCGG 54.400 -999.990 S.. V2 2008 06 16 17 19 00 -14.2400 -170.5700 60.30 42.00 18.30 255826 SMO 2008 05 28 22 39 00 4906-99 S co CCGG 54.190 -999.990 S.. V2 2008 06 16 17 35 00 -14.2400 -170.5700 60.30 42.00 18.30 255827 SMO 2008 06 04 19 40 00 4485-99 S co CCGG 55.100 -999.990 S.. V2 2008 07 11 10 05 00 -14.2400 -170.5700 60.30 42.00 18.30 257165 SMO 2008 06 04 19 40 00 4620-99 S co CCGG 54.870 -999.990 S.. V2 2008 07 11 10 20 00 -14.2400 -170.5700 60.30 42.00 18.30 257166 SMO 2008 06 04 21 35 00 1015-99 G co CCGG 56.910 -999.990 ... V2 2008 06 17 10 11 00 -14.2400 -170.5700 47.00 42.00 5.00 255824 SMO 2008 06 04 21 35 00 1016-99 G co CCGG 56.680 -999.990 ... V2 2008 06 17 10 27 00 -14.2400 -170.5700 47.00 42.00 5.00 255825 SMO 2008 06 12 21 30 00 2511-99 G co CCGG 55.800 -999.990 ... V2 2008 07 08 15 01 00 -14.2400 -170.5700 47.00 42.00 5.00 257155 SMO 2008 06 12 21 30 00 2512-99 G co CCGG 55.450 -999.990 ... V2 2008 07 08 15 17 00 -14.2400 -170.5700 47.00 42.00 5.00 257156 SMO 2008 06 12 23 38 00 1511-99 S co CCGG 52.900 -999.990 S.. V2 2008 07 11 09 34 00 -14.2400 -170.5700 60.30 42.00 18.30 257167 SMO 2008 06 12 23 38 00 1512-99 S co CCGG 53.170 -999.990 S.. V2 2008 07 11 09 50 00 -14.2400 -170.5700 60.30 42.00 18.30 257168 SMO 2008 06 20 20 25 00 2753-99 S co CCGG 58.160 -999.990 S.. V2 2008 07 08 14 31 00 -14.2400 -170.5700 60.30 42.00 18.30 257153 SMO 2008 06 20 20 25 00 2754-99 S co CCGG 57.520 -999.990 S.. V2 2008 07 08 14 46 00 -14.2400 -170.5700 60.30 42.00 18.30 257154 SMO 2008 06 20 20 47 00 4085-99 G co CCGG 61.040 -999.990 ... V2 2008 07 11 10 36 00 -14.2400 -170.5700 47.00 42.00 5.00 257169 SMO 2008 06 20 20 47 00 4086-99 G co CCGG 60.770 -999.990 ... V2 2008 07 11 10 51 00 -14.2400 -170.5700 47.00 42.00 5.00 257170 SMO 2008 06 26 20 40 00 4199-99 S co CCGG 56.950 -999.990 S.. R5 2008 07 24 10 50 00 -14.2400 -170.5700 60.30 42.00 18.30 258013 SMO 2008 06 26 20 40 00 4200-99 S co CCGG 56.150 -999.990 S.. R5 2008 07 24 11 04 00 -14.2400 -170.5700 60.30 42.00 18.30 258014 SMO 2008 06 26 20 57 00 2751-99 G co CCGG 59.170 -999.990 ... V2 2008 07 11 11 06 00 -14.2400 -170.5700 47.00 42.00 5.00 257171 SMO 2008 06 26 20 57 00 2752-99 G co CCGG 59.110 -999.990 ... V2 2008 07 11 11 22 00 -14.2400 -170.5700 47.00 42.00 5.00 257172 SMO 2008 07 03 20 39 00 885-99 S co CCGG 56.120 -999.990 S.. V2 2008 07 28 09 09 00 -14.2400 -170.5700 60.30 42.00 18.30 258011 SMO 2008 07 03 20 39 00 886-99 S co CCGG 55.580 -999.990 S.. V2 2008 07 28 09 25 00 -14.2400 -170.5700 60.30 42.00 18.30 258012 SMO 2008 07 03 22 18 00 1525-99 G co CCGG 58.660 -999.990 ... R5 2008 07 31 14 25 00 -14.2400 -170.5700 47.00 42.00 5.00 258494 SMO 2008 07 03 22 18 00 1526-99 G co CCGG 59.090 -999.990 ... R5 2008 07 31 14 40 00 -14.2400 -170.5700 47.00 42.00 5.00 258495 SMO 2008 07 10 00 39 00 2395-99 S co CCGG 54.470 -999.990 S.. R5 2008 07 31 13 57 00 -14.2400 -170.5700 60.30 42.00 18.30 258492 SMO 2008 07 10 00 39 00 2396-99 S co CCGG 54.850 -999.990 S.. R5 2008 07 31 14 11 00 -14.2400 -170.5700 60.30 42.00 18.30 258493 SMO 2008 07 10 01 10 00 319-99 G co CCGG 56.500 -999.990 ... V2 2008 08 12 11 06 00 -14.2400 -170.5700 47.00 42.00 5.00 259070 SMO 2008 07 10 01 10 00 320-99 G co CCGG 56.850 -999.990 ... V2 2008 08 12 11 22 00 -14.2400 -170.5700 47.00 42.00 5.00 259071 SMO 2008 07 16 21 20 00 2347-99 G co CCGG 59.500 -999.990 ... V2 2008 08 12 10 36 00 -14.2400 -170.5700 47.00 42.00 5.00 259074 SMO 2008 07 16 21 20 00 2348-99 G co CCGG 57.060 -999.990 ... V2 2008 08 12 10 51 00 -14.2400 -170.5700 47.00 42.00 5.00 259075 SMO 2008 07 16 22 38 00 1809-99 S co CCGG 55.140 -999.990 S.. V2 2008 08 11 16 14 00 -14.2400 -170.5700 60.30 42.00 18.30 259068 SMO 2008 07 16 22 38 00 1810-99 S co CCGG 55.100 -999.990 S.. V2 2008 08 11 16 30 00 -14.2400 -170.5700 60.30 42.00 18.30 259069 SMO 2008 07 25 00 15 00 3535-99 G co CCGG 64.830 -999.990 ... V2 2008 08 12 11 37 00 -14.2400 -170.5700 47.00 42.00 5.00 259072 SMO 2008 07 25 00 15 00 3536-99 G co CCGG 64.380 -999.990 ... V2 2008 08 12 11 52 00 -14.2400 -170.5700 47.00 42.00 5.00 259073 SMO 2008 07 25 02 39 00 513-99 S co CCGG 62.580 -999.990 S.. V2 2008 08 28 14 04 00 -14.2400 -170.5700 60.30 42.00 18.30 259683 SMO 2008 07 25 02 39 00 514-99 S co CCGG 62.540 -999.990 S.. V2 2008 08 28 14 20 00 -14.2400 -170.5700 60.30 42.00 18.30 259684 SMO 2008 07 30 22 39 00 349-99 S co CCGG 59.760 -999.990 S.. V2 2008 08 28 13 34 00 -14.2400 -170.5700 60.30 42.00 18.30 259685 SMO 2008 07 30 22 39 00 350-99 S co CCGG 59.490 -999.990 S.. V2 2008 08 28 13 49 00 -14.2400 -170.5700 60.30 42.00 18.30 259686 SMO 2008 07 30 23 30 00 5029-99 G co CCGG 61.380 -999.990 ... V2 2008 08 28 15 06 00 -14.2400 -170.5700 47.00 42.00 5.00 259687 SMO 2008 07 30 23 30 00 5030-99 G co CCGG 60.950 -999.990 ... V2 2008 08 28 15 21 00 -14.2400 -170.5700 47.00 42.00 5.00 259688 SMO 2008 08 07 00 15 00 6779-66 G co CCGG 61.440 -999.990 ... V2 2008 08 28 14 35 00 -14.2400 -170.5700 47.00 42.00 5.00 259689 SMO 2008 08 07 00 15 00 6780-66 G co CCGG 60.680 -999.990 ... V2 2008 08 28 14 51 00 -14.2400 -170.5700 47.00 42.00 5.00 259690 SMO 2008 08 07 01 40 00 3601-99 S co CCGG 58.050 -999.990 S.. V2 2008 09 09 13 08 00 -14.2400 -170.5700 60.30 42.00 18.30 260309 SMO 2008 08 07 01 40 00 3602-99 S co CCGG 57.880 -999.990 S.. V2 2008 09 09 13 23 00 -14.2400 -170.5700 60.30 42.00 18.30 260310 SMO 2008 08 14 20 39 00 4171-99 S co CCGG 58.030 -999.990 S.. V2 2008 09 09 13 39 00 -14.2400 -170.5700 60.30 42.00 18.30 260307 SMO 2008 08 14 20 39 00 4172-99 S co CCGG 57.970 -999.990 S.. V2 2008 09 09 13 54 00 -14.2400 -170.5700 60.30 42.00 18.30 260308 SMO 2008 08 14 21 18 00 957-99 G co CCGG 58.970 -999.990 ... R5 2008 09 17 10 36 00 -14.2400 -170.5700 47.00 42.00 5.00 260895 SMO 2008 08 14 21 18 00 958-99 G co CCGG 58.910 -999.990 ... R5 2008 09 17 10 50 00 -14.2400 -170.5700 47.00 42.00 5.00 260896 SMO 2008 08 21 21 35 00 1515-99 G co CCGG 58.480 -999.990 ... V2 2008 09 17 14 51 00 -14.2400 -170.5700 47.00 42.00 5.00 260939 SMO 2008 08 21 21 35 00 1516-99 G co CCGG 58.200 -999.990 ... V2 2008 09 17 15 06 00 -14.2400 -170.5700 47.00 42.00 5.00 260940 SMO 2008 08 21 22 40 00 4955-99 S co CCGG 57.710 -999.990 S.. V2 2008 09 17 10 14 00 -14.2400 -170.5700 60.30 42.00 18.30 260897 SMO 2008 08 21 22 40 00 4956-99 S co CCGG 57.280 -999.990 S.. V2 2008 09 17 10 29 00 -14.2400 -170.5700 60.30 42.00 18.30 260898 SMO 2008 08 27 20 39 00 1109-99 S co CCGG 55.610 -999.990 S.. V2 2008 09 17 15 22 00 -14.2400 -170.5700 60.30 42.00 18.30 260941 SMO 2008 08 27 20 39 00 1110-99 S co CCGG 55.590 -999.990 S.. V2 2008 09 17 15 37 00 -14.2400 -170.5700 60.30 42.00 18.30 260942 SMO 2008 08 27 22 09 00 1907-99 G co CCGG 57.900 -999.990 ... V2 2008 09 23 13 13 00 -14.2400 -170.5700 47.00 42.00 5.00 261288 SMO 2008 08 27 22 09 00 1908-99 G co CCGG 57.930 -999.990 ... V2 2008 09 23 13 28 00 -14.2400 -170.5700 47.00 42.00 5.00 261289 SMO 2008 09 05 00 30 00 2679-99 G co CCGG 59.180 -999.990 ... R5 2008 09 24 11 18 00 -14.2400 -170.5700 47.00 42.00 5.00 261302 SMO 2008 09 05 00 30 00 2680-99 G co CCGG 59.230 -999.990 ... R5 2008 09 24 11 32 00 -14.2400 -170.5700 47.00 42.00 5.00 261303 SMO 2008 09 05 01 40 00 4981-99 S co CCGG 58.320 -999.990 S.. V2 2008 09 23 13 43 00 -14.2400 -170.5700 60.30 42.00 18.30 261282 SMO 2008 09 05 01 40 00 4982-99 S co CCGG 58.280 -999.990 S.. V2 2008 09 23 13 59 00 -14.2400 -170.5700 60.30 42.00 18.30 261283 SMO 2008 09 11 20 43 00 1365-99 G co CCGG 61.100 -999.990 ... V2 2008 09 23 14 45 00 -14.2400 -170.5700 47.00 42.00 5.00 261286 SMO 2008 09 11 20 43 00 1488-99 G co CCGG 61.170 -999.990 ... V2 2008 09 23 15 00 00 -14.2400 -170.5700 47.00 42.00 5.00 261287 SMO 2008 09 11 21 39 00 1647-99 S co CCGG 59.820 -999.990 S.. V2 2008 09 23 14 30 00 -14.2400 -170.5700 60.30 42.00 18.30 261285 SMO 2008 09 11 21 39 00 226-99 S co CCGG 60.210 -999.990 S.. V2 2008 09 23 14 14 00 -14.2400 -170.5700 60.30 42.00 18.30 261284 SMO 2008 09 18 21 35 00 2444-99 G co CCGG 65.340 -999.990 ... V2 2008 10 17 10 40 00 -14.2400 -170.5700 47.00 42.00 5.00 262510 SMO 2008 09 18 21 35 00 3146-99 G co CCGG 64.730 -999.990 ... V2 2008 10 17 10 56 00 -14.2400 -170.5700 47.00 42.00 5.00 262511 SMO 2008 09 18 22 40 00 2185-99 S co CCGG 62.030 -999.990 S.. V2 2008 10 17 11 11 00 -14.2400 -170.5700 60.30 42.00 18.30 262506 SMO 2008 09 18 22 40 00 509-99 S co CCGG 61.910 -999.990 S.. V2 2008 10 17 11 27 00 -14.2400 -170.5700 60.30 42.00 18.30 262507 SMO 2008 09 25 20 15 00 2544-99 G co CCGG 63.380 -999.990 ... V2 2008 10 17 12 13 00 -14.2400 -170.5700 47.00 42.00 5.00 262512 SMO 2008 09 25 20 15 00 4740-99 G co CCGG 62.930 -999.990 ... V2 2008 10 17 12 28 00 -14.2400 -170.5700 47.00 42.00 5.00 262513 SMO 2008 09 25 21 38 00 3123-99 S co CCGG 61.720 -999.990 S.. V2 2008 10 17 11 42 00 -14.2400 -170.5700 60.30 42.00 18.30 262508 SMO 2008 09 25 21 38 00 3466-99 S co CCGG 61.860 -999.990 S.. V2 2008 10 17 11 57 00 -14.2400 -170.5700 60.30 42.00 18.30 262509 SMO 2008 10 02 20 40 00 1915-99 S co CCGG 58.370 -999.990 S.. V2 2008 10 29 12 02 00 -14.2400 -170.5700 60.30 42.00 18.30 263117 SMO 2008 10 02 20 40 00 1916-99 S co CCGG 58.370 -999.990 S.. V2 2008 10 29 12 18 00 -14.2400 -170.5700 60.30 42.00 18.30 263118 SMO 2008 10 02 20 56 00 2529-99 G co CCGG 59.270 -999.990 ... V2 2008 10 29 12 33 00 -14.2400 -170.5700 47.00 42.00 5.00 263115 SMO 2008 10 02 20 56 00 2530-99 G co CCGG 59.510 -999.990 ... V2 2008 10 29 12 49 00 -14.2400 -170.5700 47.00 42.00 5.00 263116 SMO 2008 10 09 19 25 00 2823-99 S co CCGG 61.150 -999.990 S.. V2 2008 10 29 11 16 00 -14.2400 -170.5700 60.30 42.00 18.30 263120 SMO 2008 10 09 19 25 00 4716-99 S co CCGG 61.530 -999.990 S.. V2 2008 10 29 11 01 00 -14.2400 -170.5700 60.30 42.00 18.30 263119 SMO 2008 10 09 20 55 00 2568-99 G co CCGG 62.510 -999.990 ... V2 2008 10 29 11 47 00 -14.2400 -170.5700 47.00 42.00 5.00 263121 SMO 2008 10 09 20 55 00 4165-99 G co CCGG 62.910 -999.990 ... V2 2008 10 29 11 32 00 -14.2400 -170.5700 47.00 42.00 5.00 263122 SMO 2008 10 16 20 42 00 3844-99 G co CCGG 61.080 -999.990 ... V2 2008 11 04 15 56 00 -14.2400 -170.5700 47.00 42.00 5.00 263407 SMO 2008 10 16 20 42 00 4079-99 G co CCGG 60.790 -999.990 ... V2 2008 11 04 16 12 00 -14.2400 -170.5700 47.00 42.00 5.00 263408 SMO 2008 10 16 22 39 00 1280-99 S co CCGG 60.280 -999.990 S.. V2 2008 11 04 15 26 00 -14.2400 -170.5700 60.30 42.00 18.30 263405 SMO 2008 10 16 22 39 00 377-99 S co CCGG 60.230 -999.990 S.. V2 2008 11 04 15 41 00 -14.2400 -170.5700 60.30 42.00 18.30 263406 SMO 2008 10 23 21 20 00 3174-99 G co CCGG 64.720 -999.990 ... V2 2008 11 14 12 36 00 -14.2400 -170.5700 47.00 42.00 5.00 263878 SMO 2008 10 23 21 20 00 464-99 G co CCGG 64.400 -999.990 ... V2 2008 11 14 12 51 00 -14.2400 -170.5700 47.00 42.00 5.00 263877 SMO 2008 10 23 22 40 00 2829-99 S co CCGG 62.000 -999.990 S.. V2 2008 11 14 13 06 00 -14.2400 -170.5700 60.30 42.00 18.30 263879 SMO 2008 10 23 22 40 00 772-99 S co CCGG 62.710 -999.990 S.. V2 2008 11 14 13 22 00 -14.2400 -170.5700 60.30 42.00 18.30 263880 SMO 2008 10 31 19 40 00 2593-99 S co CCGG 66.240 -999.990 S.. R5 2008 12 02 13 49 00 -14.2400 -170.5700 60.30 42.00 18.30 264623 SMO 2008 10 31 19 40 00 4798-99 S co CCGG 60.830 -999.990 S.. R5 2008 12 02 14 03 00 -14.2400 -170.5700 60.30 42.00 18.30 264624 SMO 2008 10 31 20 20 00 169-99 G co CCGG 63.200 -999.990 ... R5 2008 12 02 13 20 00 -14.2400 -170.5700 47.00 42.00 5.00 264627 SMO 2008 10 31 20 20 00 3153-99 G co CCGG 63.210 -999.990 ... R5 2008 12 02 13 34 00 -14.2400 -170.5700 47.00 42.00 5.00 264628 SMO 2008 11 06 19 00 00 103-99 G co CCGG 57.500 -999.990 ... R5 2008 12 02 11 55 00 -14.2400 -170.5700 47.00 42.00 5.00 264625 SMO 2008 11 06 19 00 00 104-99 G co CCGG 57.510 -999.990 ... R5 2008 12 02 12 09 00 -14.2400 -170.5700 47.00 42.00 5.00 264626 SMO 2008 11 06 20 39 00 2199-99 S co CCGG 56.240 -999.990 S.. R5 2008 12 02 12 52 00 -14.2400 -170.5700 60.30 42.00 18.30 264621 SMO 2008 11 06 20 39 00 2200-99 S co CCGG 56.130 -999.990 S.. R5 2008 12 02 13 06 00 -14.2400 -170.5700 60.30 42.00 18.30 264622 SMO 2008 11 13 19 30 00 3176-99 G co CCGG 61.050 -999.990 ... V2 2008 12 08 13 35 00 -14.2400 -170.5700 47.00 42.00 5.00 265038 SMO 2008 11 13 19 30 00 3623-99 G co CCGG 61.030 -999.990 ... V2 2008 12 08 13 20 00 -14.2400 -170.5700 47.00 42.00 5.00 265039 SMO 2008 11 13 21 40 00 1969-99 S co CCGG 59.430 -999.990 S.. V2 2008 12 08 13 51 00 -14.2400 -170.5700 60.30 42.00 18.30 265036 SMO 2008 11 13 21 40 00 2782-99 S co CCGG 59.160 -999.990 S.. V2 2008 12 08 14 06 00 -14.2400 -170.5700 60.30 42.00 18.30 265037 SMO 2008 11 20 20 30 00 1519-99 G co CCGG 64.380 -999.990 ... R5 2008 12 22 14 14 00 -14.2400 -170.5700 47.00 42.00 5.00 265920 SMO 2008 11 20 20 30 00 1520-99 G co CCGG 63.670 -999.990 ... R5 2008 12 22 14 28 00 -14.2400 -170.5700 47.00 42.00 5.00 265921 SMO 2008 11 20 22 39 00 809-99 S co CCGG 62.530 -999.990 S.. R5 2008 12 22 14 42 00 -14.2400 -170.5700 60.30 42.00 18.30 265922 SMO 2008 11 20 22 39 00 810-99 S co CCGG 62.180 -999.990 S.. R5 2008 12 22 14 57 00 -14.2400 -170.5700 60.30 42.00 18.30 265923 SMO 2008 11 26 19 28 00 1940-99 G co CCGG 57.600 -999.990 ... R5 2008 12 18 17 30 00 -14.2400 -170.5700 47.00 42.00 5.00 265905 SMO 2008 11 26 19 28 00 813-99 G co CCGG 57.530 -999.990 ... R5 2008 12 18 17 15 00 -14.2400 -170.5700 47.00 42.00 5.00 265904 SMO 2008 11 26 22 40 00 3765-99 S co CCGG 56.820 -999.990 S.. R5 2008 12 18 14 53 00 -14.2400 -170.5700 60.30 42.00 18.30 265906 SMO 2008 11 26 22 40 00 3977-99 S co CCGG 56.780 -999.990 S.. R5 2008 12 18 15 07 00 -14.2400 -170.5700 60.30 42.00 18.30 265907 SMO 2008 12 04 19 59 00 1213-99 G co CCGG 55.990 -999.990 ... V2 2008 12 31 11 30 00 -14.2400 -170.5700 47.00 42.00 5.00 266646 SMO 2008 12 04 19 59 00 1214-99 G co CCGG 56.610 -999.990 ... V2 2008 12 31 11 45 00 -14.2400 -170.5700 47.00 42.00 5.00 266647 SMO 2008 12 04 20 40 00 441-99 S co CCGG 54.440 -999.990 S.. V2 2008 12 31 10 59 00 -14.2400 -170.5700 60.30 42.00 18.30 266644 SMO 2008 12 04 20 40 00 442-99 S co CCGG 53.850 -999.990 S.. V2 2008 12 31 11 14 00 -14.2400 -170.5700 60.30 42.00 18.30 266645 SMO 2008 12 11 20 25 00 2327-99 G co CCGG 55.120 -999.990 ... R5 2009 01 05 13 44 00 -14.2400 -170.5700 47.00 42.00 5.00 266772 SMO 2008 12 11 20 25 00 2328-99 G co CCGG 54.640 -999.990 ... R5 2009 01 05 13 59 00 -14.2400 -170.5700 47.00 42.00 5.00 266773 SMO 2008 12 11 21 41 00 1091-99 S co CCGG 53.810 -999.990 S.. R5 2009 01 05 14 13 00 -14.2400 -170.5700 60.30 42.00 18.30 266770 SMO 2008 12 11 21 41 00 1092-99 S co CCGG 53.010 -999.990 S.. R5 2009 01 05 14 27 00 -14.2400 -170.5700 60.30 42.00 18.30 266771 SMO 2008 12 18 20 45 00 1252-99 G co CCGG 63.440 -999.990 ... V2 2009 01 09 15 48 00 -14.2400 -170.5700 47.00 42.00 5.00 267132 SMO 2008 12 18 20 45 00 672-99 G co CCGG 63.620 -999.990 ... V2 2009 01 09 16 04 00 -14.2400 -170.5700 47.00 42.00 5.00 267131 SMO 2008 12 18 21 40 00 1690-99 S co CCGG 61.170 -999.990 S.. V2 2009 01 09 16 19 00 -14.2400 -170.5700 60.30 42.00 18.30 267133 SMO 2008 12 18 21 40 00 3734-99 S co CCGG 61.880 -999.990 S.. V2 2009 01 09 16 34 00 -14.2400 -170.5700 60.30 42.00 18.30 267134 SMO 2008 12 23 20 10 00 1027-99 G co CCGG 55.120 -999.990 ... R5 2009 01 14 13 10 00 -14.2400 -170.5700 47.00 42.00 5.00 267424 SMO 2008 12 23 20 10 00 1570-99 G co CCGG 55.320 -999.990 ... R5 2009 01 14 13 25 00 -14.2400 -170.5700 47.00 42.00 5.00 267425 SMO 2008 12 23 21 39 00 2324-99 S co CCGG 53.000 -999.990 S.. R5 2009 01 14 10 48 00 -14.2400 -170.5700 60.30 42.00 18.30 267420 SMO 2008 12 23 21 39 00 4014-99 S co CCGG 52.450 -999.990 S.. R5 2009 01 14 11 02 00 -14.2400 -170.5700 60.30 42.00 18.30 267421 SMO 2008 12 31 22 45 00 2409-99 G co CCGG 51.630 -999.990 ... V2 2009 01 29 12 02 00 -14.2400 -170.5700 47.00 42.00 5.00 268195 SMO 2008 12 31 22 45 00 2410-99 G co CCGG 51.170 -999.990 ... V2 2009 01 29 12 17 00 -14.2400 -170.5700 47.00 42.00 5.00 268196 SMO 2008 12 31 23 40 00 2291-99 S co CCGG 48.780 -999.990 S.. V2 2009 01 29 11 31 00 -14.2400 -170.5700 60.30 42.00 18.30 268191 SMO 2008 12 31 23 40 00 2292-99 S co CCGG 48.610 -999.990 S.. V2 2009 01 29 11 46 00 -14.2400 -170.5700 60.30 42.00 18.30 268192 SMO 2009 01 08 20 40 00 2395-99 G co CCGG 56.480 -999.990 ... V2 2009 01 28 17 04 00 -14.2400 -170.5700 47.00 42.00 5.00 268197 SMO 2009 01 08 20 40 00 2396-99 G co CCGG 56.250 -999.990 ... V2 2009 01 28 17 19 00 -14.2400 -170.5700 47.00 42.00 5.00 268198 SMO 2009 01 08 21 40 00 503-99 S co CCGG 55.270 -999.990 S.. V2 2009 01 29 11 00 00 -14.2400 -170.5700 60.30 42.00 18.30 268193 SMO 2009 01 08 21 40 00 504-99 S co CCGG 54.840 -999.990 S.. V2 2009 01 29 11 16 00 -14.2400 -170.5700 60.30 42.00 18.30 268194 SMO 2009 01 15 20 41 00 4047-99 G co CCGG 61.620 -999.990 ... R5 2009 02 05 13 57 00 -14.2400 -170.5700 47.00 42.00 5.00 268786 SMO 2009 01 15 20 41 00 4048-99 G co CCGG 61.580 -999.990 ... R5 2009 02 05 14 11 00 -14.2400 -170.5700 47.00 42.00 5.00 268787 SMO 2009 01 15 21 40 00 6397-66 S co CCGG 59.150 -999.990 S.. R5 2009 02 05 13 28 00 -14.2400 -170.5700 60.30 42.00 18.30 268780 SMO 2009 01 15 21 40 00 6398-66 S co CCGG 59.480 -999.990 S.. R5 2009 02 05 13 43 00 -14.2400 -170.5700 60.30 42.00 18.30 268781 SMO 2009 01 22 20 50 00 2557-99 G co CCGG 59.590 -999.990 ... R5 2009 02 05 14 54 00 -14.2400 -170.5700 47.00 42.00 5.00 268784 SMO 2009 01 22 20 50 00 2558-99 G co CCGG 61.110 -999.990 ... R5 2009 02 05 15 08 00 -14.2400 -170.5700 47.00 42.00 5.00 268785 SMO 2009 01 22 21 40 00 4953-99 S co CCGG 52.070 -999.990 S.. R5 2009 02 05 14 25 00 -14.2400 -170.5700 60.30 42.00 18.30 268782 SMO 2009 01 22 21 40 00 4954-99 S co CCGG 51.950 -999.990 S.. R5 2009 02 05 14 40 00 -14.2400 -170.5700 60.30 42.00 18.30 268783 SMO 2009 01 30 00 15 00 1841-99 G co CCGG 58.450 -999.990 ... V2 2009 02 19 14 29 00 -14.2474 -170.5644 47.00 42.00 5.00 269713 SMO 2009 01 30 00 15 00 1842-99 G co CCGG 58.220 -999.990 ... V2 2009 02 19 14 44 00 -14.2474 -170.5644 47.00 42.00 5.00 269714 SMO 2009 01 30 00 39 00 4101-99 S co CCGG 56.270 -999.990 S.. V2 2009 02 19 13 58 00 -14.2474 -170.5644 60.30 42.00 18.30 269715 SMO 2009 01 30 00 39 00 4102-99 S co CCGG 55.670 -999.990 S.. V2 2009 02 19 14 14 00 -14.2474 -170.5644 60.30 42.00 18.30 269716 SMO 2009 02 04 22 07 00 4994-99 G co CCGG 54.150 -999.990 ... V2 2009 03 03 16 27 00 -14.2474 -170.5644 47.00 42.00 5.00 270507 SMO 2009 02 04 22 07 00 99-99 G co CCGG 54.280 -999.990 ... V2 2009 03 03 16 43 00 -14.2474 -170.5644 47.00 42.00 5.00 270508 SMO 2009 02 04 22 40 00 1457-99 S co CCGG 55.190 -999.990 S.. V2 2009 03 04 11 03 00 -14.2474 -170.5644 60.30 42.00 18.30 270506 SMO 2009 02 04 22 40 00 1970-99 S co CCGG 54.630 -999.990 S.. V2 2009 03 04 10 48 00 -14.2474 -170.5644 60.30 42.00 18.30 270505 SMO 2009 02 13 00 30 00 1789-99 G co CCGG 71.630 -999.990 .X. V2 2009 03 04 13 37 00 -14.2474 -170.5644 47.00 42.00 5.00 270504 SMO 2009 02 13 00 30 00 796-99 G co CCGG 74.440 -999.990 .X. V2 2009 03 04 13 21 00 -14.2474 -170.5644 47.00 42.00 5.00 270503 SMO 2009 02 13 01 40 00 3508-99 S co CCGG 66.110 -999.990 S.. V2 2009 03 04 14 08 00 -14.2474 -170.5644 60.30 42.00 18.30 270502 SMO 2009 02 13 01 40 00 3846-99 S co CCGG 66.430 -999.990 S.. V2 2009 03 04 13 52 00 -14.2474 -170.5644 60.30 42.00 18.30 270501 SMO 2009 02 19 21 33 00 3989-99 G co CCGG 51.290 -999.990 ... V2 2009 03 10 10 51 00 -14.2474 -170.5644 47.00 42.00 5.00 271116 SMO 2009 02 19 21 33 00 3990-99 G co CCGG 51.820 -999.990 ... V2 2009 03 10 11 07 00 -14.2474 -170.5644 47.00 42.00 5.00 271117 SMO 2009 02 19 22 38 00 3943-99 S co CCGG 47.960 -999.990 S.. V2 2009 03 10 11 22 00 -14.2474 -170.5644 60.30 42.00 18.30 271114 SMO 2009 02 19 22 38 00 3944-99 S co CCGG 47.780 -999.990 S.. V2 2009 03 10 11 37 00 -14.2474 -170.5644 60.30 42.00 18.30 271115 SMO 2009 02 26 22 07 00 2307-99 G co CCGG 52.550 -999.990 ... R5 2009 03 25 12 46 00 -14.2474 -170.5644 47.00 42.00 5.00 272187 SMO 2009 02 26 22 07 00 2308-99 G co CCGG 52.150 -999.990 ... R5 2009 03 25 13 00 00 -14.2474 -170.5644 47.00 42.00 5.00 272188 SMO 2009 02 26 23 38 00 3569-99 S co CCGG 50.470 -999.990 S.. R5 2009 03 25 13 14 00 -14.2474 -170.5644 60.30 42.00 18.30 272193 SMO 2009 02 26 23 38 00 3570-99 S co CCGG 50.880 -999.990 S.. R5 2009 03 25 13 29 00 -14.2474 -170.5644 60.30 42.00 18.30 272194 SMO 2009 03 05 20 28 00 161-99 G co CCGG 72.880 -999.990 .X. R5 2009 03 25 14 26 00 -14.2474 -170.5644 47.00 42.00 5.00 272189 SMO 2009 03 05 20 28 00 953-99 G co CCGG 73.620 -999.990 .X. R5 2009 03 25 14 11 00 -14.2474 -170.5644 47.00 42.00 5.00 272190 SMO 2009 03 05 21 40 00 148-99 S co CCGG 70.000 -999.990 S.. R5 2009 03 25 13 57 00 -14.2474 -170.5644 60.30 42.00 18.30 272197 SMO 2009 03 05 21 40 00 4183-99 S co CCGG 69.450 -999.990 S.. R5 2009 03 25 13 43 00 -14.2474 -170.5644 60.30 42.00 18.30 272196 SMO 2009 03 12 20 40 00 1459-99 S co CCGG 60.320 -999.990 S.. V2 2009 04 02 12 25 00 -14.2474 -170.5644 60.30 42.00 18.30 272685 SMO 2009 03 12 20 40 00 458-99 S co CCGG 60.800 -999.990 S.. V2 2009 04 02 12 10 00 -14.2474 -170.5644 60.30 42.00 18.30 272684 SMO 2009 03 12 21 37 00 1062-99 G co CCGG 61.680 -999.990 ... V2 2009 04 02 11 39 00 -14.2474 -170.5644 47.00 42.00 5.00 272686 SMO 2009 03 12 21 37 00 2505-99 G co CCGG 61.040 -999.990 ... V2 2009 04 02 11 54 00 -14.2474 -170.5644 47.00 42.00 5.00 272687 SMO 2009 03 19 22 30 00 3909-99 G co CCGG 71.190 -999.990 .X. V2 2009 04 11 16 35 00 -14.2474 -170.5644 47.00 42.00 5.00 273247 SMO 2009 03 19 22 30 00 4590-99 G co CCGG 71.080 -999.990 .X. V2 2009 04 11 16 20 00 -14.2474 -170.5644 47.00 42.00 5.00 273248 SMO 2009 03 19 23 38 00 1893-99 S co CCGG 69.040 -999.990 S.. V2 2009 04 13 10 33 00 -14.2474 -170.5644 60.30 42.00 18.30 273245 SMO 2009 03 19 23 38 00 802-99 S co CCGG 67.960 -999.990 S.. V2 2009 04 13 10 48 00 -14.2474 -170.5644 60.30 42.00 18.30 273246 SMO 2009 03 26 19 40 00 3670-99 G co CCGG 50.330 -999.990 ... R5 2009 04 20 12 46 00 -14.2474 -170.5644 47.00 42.00 5.00 273975 SMO 2009 03 26 19 40 00 3895-99 G co CCGG 50.330 -999.990 ... R5 2009 04 20 13 00 00 -14.2474 -170.5644 47.00 42.00 5.00 273976 SMO 2009 03 26 20 39 00 1981-99 S co CCGG 49.700 -999.990 S.. R5 2009 04 20 13 29 00 -14.2474 -170.5644 60.30 42.00 18.30 273978 SMO 2009 03 26 20 39 00 576-99 S co CCGG 49.750 -999.990 S.. R5 2009 04 20 13 14 00 -14.2474 -170.5644 60.30 42.00 18.30 273977 SMO 2009 04 02 19 39 00 3050-99 S co CCGG 69.900 -999.990 S.. R5 2009 04 20 11 49 00 -14.2474 -170.5644 60.30 42.00 18.30 273979 SMO 2009 04 02 19 39 00 783-99 S co CCGG 70.030 -999.990 S.. R5 2009 04 20 12 03 00 -14.2474 -170.5644 60.30 42.00 18.30 273980 SMO 2009 04 02 20 28 00 3295-99 G co CCGG 70.280 -999.990 .X. R5 2009 04 20 12 31 00 -14.2474 -170.5644 47.00 42.00 5.00 273974 SMO 2009 04 02 20 28 00 542-99 G co CCGG 70.310 -999.990 .X. R5 2009 04 20 12 17 00 -14.2474 -170.5644 47.00 42.00 5.00 273973 SMO 2009 04 09 19 25 00 25-99 G co CCGG 49.890 -999.990 ... R5 2009 04 28 13 32 00 -14.2474 -170.5644 47.00 42.00 5.00 274364 SMO 2009 04 09 19 25 00 3000-99 G co CCGG 50.130 -999.990 ... R5 2009 04 28 13 46 00 -14.2474 -170.5644 47.00 42.00 5.00 274365 SMO 2009 04 09 20 41 00 1248-99 S co CCGG 49.730 -999.990 S.. R5 2009 04 28 13 03 00 -14.2474 -170.5644 60.30 42.00 18.30 274362 SMO 2009 04 09 20 41 00 4754-99 S co CCGG 48.910 -999.990 S.. R5 2009 04 28 13 17 00 -14.2474 -170.5644 60.30 42.00 18.30 274363 SMO 2009 04 17 20 40 00 2561-99 S co CCGG 58.680 -999.990 S.. V2 2009 05 05 16 05 00 -14.2474 -170.5644 60.30 42.00 18.30 274876 SMO 2009 04 17 20 40 00 4556-99 S co CCGG 58.510 -999.990 S.. V2 2009 05 05 16 21 00 -14.2474 -170.5644 60.30 42.00 18.30 274877 SMO 2009 04 24 20 39 00 6015-66 S co CCGG 49.200 -999.990 S.. V2 2009 05 22 15 05 00 -14.2474 -170.5644 60.30 42.00 18.30 275642 SMO 2009 04 24 20 39 00 6016-66 S co CCGG 49.300 -999.990 S.. V2 2009 05 22 15 21 00 -14.2474 -170.5644 60.30 42.00 18.30 275643 SMO 2009 04 24 20 45 00 1381-99 G co CCGG 51.180 -999.990 ... V2 2009 05 26 12 06 00 -14.2474 -170.5644 47.00 42.00 5.00 275648 SMO 2009 04 24 20 45 00 1382-99 G co CCGG 50.250 -999.990 ... V2 2009 05 26 12 21 00 -14.2474 -170.5644 47.00 42.00 5.00 275649 SMO 2009 05 01 21 43 00 1300-99 G co CCGG 55.390 -999.990 ... V2 2009 05 26 13 23 00 -14.2474 -170.5644 47.00 42.00 5.00 275647 SMO 2009 05 01 21 43 00 2973-99 G co CCGG 55.010 -999.990 ... V2 2009 05 26 13 08 00 -14.2474 -170.5644 47.00 42.00 5.00 275646 SMO 2009 05 01 22 39 00 2720-99 S co CCGG 54.410 -999.990 S.. V2 2009 05 26 12 52 00 -14.2474 -170.5644 60.30 42.00 18.30 275645 SMO 2009 05 01 22 39 00 3976-99 S co CCGG 53.180 -999.990 S.. V2 2009 05 26 12 37 00 -14.2474 -170.5644 60.30 42.00 18.30 275644 SMO 2009 05 08 20 35 00 225-99 G co CCGG 65.010 -999.990 ... V2 2009 06 01 11 07 00 -14.2474 -170.5644 47.00 42.00 5.00 276135 SMO 2009 05 08 20 35 00 2686-99 G co CCGG 65.430 -999.990 ... V2 2009 06 01 11 22 00 -14.2474 -170.5644 47.00 42.00 5.00 276136 SMO 2009 05 08 23 41 00 1296-99 S co CCGG 62.800 -999.990 S.. V2 2009 06 01 12 24 00 -14.2474 -170.5644 60.30 42.00 18.30 276133 SMO 2009 05 08 23 41 00 927-99 S co CCGG 62.750 -999.990 S.. V2 2009 06 01 12 08 00 -14.2474 -170.5644 60.30 42.00 18.30 276134 SMO 2009 05 14 19 44 00 2604-99 G co CCGG 51.910 -999.990 ... R5 2009 06 17 14 23 00 -14.2474 -170.5644 47.00 42.00 5.00 276540 SMO 2009 05 14 19 44 00 4088-99 G co CCGG 51.520 -999.990 ... R5 2009 06 17 14 38 00 -14.2474 -170.5644 47.00 42.00 5.00 276541 SMO 2009 05 14 20 42 00 2136-99 S co CCGG 50.120 -999.990 S.. R5 2009 06 18 10 04 00 -14.2474 -170.5644 60.30 42.00 18.30 276546 SMO 2009 05 14 20 42 00 922-99 S co CCGG 51.040 -999.990 S.. R5 2009 06 18 10 18 00 -14.2474 -170.5644 60.30 42.00 18.30 276547 SMO 2009 05 19 21 10 00 2091-99 G co CCGG 55.650 -999.990 ... R5 2009 06 17 14 52 00 -14.2474 -170.5644 47.00 42.00 5.00 276542 SMO 2009 05 19 21 10 00 2092-99 G co CCGG 55.430 -999.990 ... R5 2009 06 17 15 06 00 -14.2474 -170.5644 47.00 42.00 5.00 276543 SMO 2009 05 19 21 40 00 3313-99 S co CCGG 54.600 -999.990 S.. R5 2009 06 18 09 35 00 -14.2474 -170.5644 60.30 42.00 18.30 276544 SMO 2009 05 19 21 40 00 3314-99 S co CCGG 54.480 -999.990 S.. R5 2009 06 18 09 49 00 -14.2474 -170.5644 60.30 42.00 18.30 276545 SMO 2009 05 28 20 55 00 2585-99 G co CCGG 56.130 -999.990 ... V2 2009 06 29 14 07 00 -14.2474 -170.5644 47.00 42.00 5.00 277379 SMO 2009 05 28 20 55 00 2586-99 G co CCGG 55.540 -999.990 ... V2 2009 06 29 14 23 00 -14.2474 -170.5644 47.00 42.00 5.00 277380 SMO 2009 05 28 21 40 00 2303-99 S co CCGG 54.600 -999.990 S.. V2 2009 06 29 14 38 00 -14.2474 -170.5644 60.30 42.00 18.30 277377 SMO 2009 05 28 21 40 00 2304-99 S co CCGG 53.970 -999.990 S.. V2 2009 06 29 14 54 00 -14.2474 -170.5644 60.30 42.00 18.30 277378 SMO 2009 06 05 19 25 00 21-99 G co CCGG 71.080 -999.990 N.. R5 2009 07 08 12 03 00 -14.2474 -170.5644 47.00 42.00 5.00 278284 SMO 2009 06 05 19 25 00 22-99 G co CCGG 69.620 -999.990 N.. R5 2009 07 08 12 17 00 -14.2474 -170.5644 47.00 42.00 5.00 278285 SMO 2009 06 05 20 40 00 321-99 S co CCGG 60.830 -999.990 ... R5 2009 07 08 15 23 00 -14.2474 -170.5644 60.30 42.00 18.30 278282 SMO 2009 06 05 20 40 00 322-99 S co CCGG 63.830 -999.990 ... R5 2009 07 08 15 37 00 -14.2474 -170.5644 60.30 42.00 18.30 278283 SMO 2009 06 11 19 35 00 115-99 G co CCGG 52.830 -999.990 N.. R5 2009 07 08 13 00 00 -14.2474 -170.5644 47.00 42.00 5.00 278286 SMO 2009 06 11 19 35 00 116-99 G co CCGG 52.580 -999.990 N.. R5 2009 07 08 13 14 00 -14.2474 -170.5644 47.00 42.00 5.00 278287 SMO 2009 06 11 21 40 00 6215-66 S co CCGG 51.470 -999.990 ... R5 2009 07 08 12 31 00 -14.2474 -170.5644 60.30 42.00 18.30 278280 SMO 2009 06 11 21 40 00 6216-66 S co CCGG 51.700 -999.990 ... R5 2009 07 08 12 46 00 -14.2474 -170.5644 60.30 42.00 18.30 278281 SMO 2009 06 19 21 35 00 697-99 G co CCGG 55.580 -999.990 N.. R5 2009 07 15 13 56 00 -14.2474 -170.5644 47.00 42.00 5.00 278769 SMO 2009 06 19 21 35 00 698-99 G co CCGG 56.560 -999.990 N.. R5 2009 07 15 14 11 00 -14.2474 -170.5644 47.00 42.00 5.00 278770 SMO 2009 06 19 22 41 00 165-99 S co CCGG 53.660 -999.990 ... R5 2009 07 15 13 28 00 -14.2474 -170.5644 60.30 42.00 18.30 278765 SMO 2009 06 19 22 41 00 166-99 S co CCGG 53.540 -999.990 ... R5 2009 07 15 13 42 00 -14.2474 -170.5644 60.30 42.00 18.30 278766 SMO 2009 06 25 20 50 00 4363-99 G co CCGG 53.550 -999.990 N.. R5 2009 07 15 14 39 00 -14.2474 -170.5644 47.00 42.00 5.00 278771 SMO 2009 06 25 20 50 00 6638-66 G co CCGG 53.560 -999.990 N.. R5 2009 07 15 14 25 00 -14.2474 -170.5644 47.00 42.00 5.00 278772 SMO 2009 06 25 21 40 00 4313-99 S co CCGG 52.930 -999.990 ... R5 2009 07 15 15 08 00 -14.2474 -170.5644 60.30 42.00 18.30 278768 SMO 2009 06 25 21 40 00 6330-66 S co CCGG 53.200 -999.990 ... R5 2009 07 15 14 53 00 -14.2474 -170.5644 60.30 42.00 18.30 278767 SMO 2009 07 02 21 30 00 3325-99 G co CCGG 55.040 -999.990 N.. V2 2009 07 24 16 40 00 -14.2474 -170.5644 47.00 42.00 5.00 279746 SMO 2009 07 02 21 30 00 3326-99 G co CCGG 54.520 -999.990 N.. V2 2009 07 24 16 56 00 -14.2474 -170.5644 47.00 42.00 5.00 279747 SMO 2009 07 02 22 25 00 1195-99 S co CCGG 54.790 -999.990 ... V2 2009 07 24 16 09 00 -14.2474 -170.5644 60.30 42.00 18.30 279744 SMO 2009 07 02 22 25 00 1196-99 S co CCGG 55.100 -999.990 ... V2 2009 07 24 16 25 00 -14.2474 -170.5644 60.30 42.00 18.30 279745 SMO 2009 07 10 00 20 00 7-99 G co CCGG 55.550 -999.990 N.. V2 2009 08 11 10 10 00 -14.2474 -170.5644 47.00 42.00 5.00 280969 SMO 2009 07 10 00 20 00 8-99 G co CCGG 55.560 -999.990 N.. V2 2009 08 11 10 26 00 -14.2474 -170.5644 47.00 42.00 5.00 280970 SMO 2009 07 10 01 39 00 2319-99 S co CCGG 54.400 -999.990 ... V2 2009 08 11 11 12 00 -14.2474 -170.5644 60.30 42.00 18.30 280971 SMO 2009 07 10 01 39 00 2320-99 S co CCGG 53.870 -999.990 ... V2 2009 08 11 11 27 00 -14.2474 -170.5644 60.30 42.00 18.30 280972 SMO 2009 07 17 20 29 00 1723-99 G co CCGG 58.030 -999.990 N.. V2 2009 08 11 09 40 00 -14.2474 -170.5644 47.00 42.00 5.00 280967 SMO 2009 07 17 20 29 00 1724-99 G co CCGG 57.540 -999.990 N.. V2 2009 08 11 09 55 00 -14.2474 -170.5644 47.00 42.00 5.00 280968 SMO 2009 07 17 22 39 00 423-99 S co CCGG 57.850 -999.990 ... V2 2009 08 11 10 41 00 -14.2474 -170.5644 60.30 42.00 18.30 280973 SMO 2009 07 17 22 39 00 424-99 S co CCGG 57.830 -999.990 ... V2 2009 08 11 10 57 00 -14.2474 -170.5644 60.30 42.00 18.30 280974 SMO 2009 07 23 21 15 00 1428-99 G co CCGG 61.420 -999.990 N.. V2 2009 08 13 11 22 00 -14.2474 -170.5644 47.00 42.00 5.00 281308 SMO 2009 07 23 21 15 00 4673-99 G co CCGG 61.660 -999.990 N.. V2 2009 08 13 11 06 00 -14.2474 -170.5644 47.00 42.00 5.00 281309 SMO 2009 07 23 22 38 00 3093-99 S co CCGG 58.820 -999.990 ... V2 2009 08 13 11 37 00 -14.2474 -170.5644 60.30 42.00 18.30 281306 SMO 2009 07 23 22 38 00 3525-99 S co CCGG 59.330 -999.990 ... V2 2009 08 13 11 53 00 -14.2474 -170.5644 60.30 42.00 18.30 281307 SMO 2009 07 30 21 02 00 1145-99 G co CCGG 59.710 -999.990 N.. V2 2009 08 18 12 05 00 -14.2474 -170.5644 47.00 42.00 5.00 281305 SMO 2009 07 30 21 02 00 3765-99 G co CCGG 59.790 -999.990 N.. V2 2009 08 18 11 50 00 -14.2474 -170.5644 47.00 42.00 5.00 281304 SMO 2009 07 30 21 40 00 2836-99 S co CCGG 58.290 -999.990 ... V2 2009 08 18 10 48 00 -14.2474 -170.5644 60.30 42.00 18.30 281302 SMO 2009 07 30 21 40 00 2921-99 S co CCGG 57.830 -999.990 ... V2 2009 08 18 11 04 00 -14.2474 -170.5644 60.30 42.00 18.30 281303 SMO 2009 08 07 19 48 00 4150-99 G co CCGG 56.320 -999.990 N.. R5 2009 08 27 12 21 00 -14.2474 -170.5644 47.00 42.00 5.00 282081 SMO 2009 08 07 19 48 00 4635-99 G co CCGG 56.230 -999.990 N.. R5 2009 08 27 12 35 00 -14.2474 -170.5644 47.00 42.00 5.00 282082 SMO 2009 08 07 22 39 00 162-99 S co CCGG 54.760 -999.990 ... R5 2009 08 27 12 06 00 -14.2474 -170.5644 60.30 42.00 18.30 282080 SMO 2009 08 07 22 39 00 733-99 S co CCGG 54.510 -999.990 ... R5 2009 08 27 11 52 00 -14.2474 -170.5644 60.30 42.00 18.30 282079 SMO 2009 08 13 20 39 00 410-99 G co CCGG 60.750 -999.990 N.. V2 2009 08 31 12 01 00 -14.2474 -170.5644 47.00 42.00 5.00 282384 SMO 2009 08 13 20 39 00 4860-99 G co CCGG 60.590 -999.990 N.. V2 2009 08 31 11 45 00 -14.2474 -170.5644 47.00 42.00 5.00 282383 SMO 2009 08 13 23 39 00 2332-99 S co CCGG 58.030 -999.990 ... V2 2009 08 31 11 30 00 -14.2474 -170.5644 60.30 42.00 18.30 282382 SMO 2009 08 13 23 39 00 3628-99 S co CCGG 59.830 -999.990 ... V2 2009 08 31 11 14 00 -14.2474 -170.5644 60.30 42.00 18.30 282381 SMO 2009 08 20 21 09 00 4699-99 G co CCGG 58.060 -999.990 N.. V2 2009 09 22 12 01 00 -14.2474 -170.5644 47.00 42.00 5.00 283603 SMO 2009 08 20 21 09 00 555-99 G co CCGG 58.950 -999.990 N.. V2 2009 09 22 12 16 00 -14.2474 -170.5644 47.00 42.00 5.00 283604 SMO 2009 08 20 22 34 00 545-99 S co CCGG 56.310 -999.990 ... V2 2009 09 22 11 30 00 -14.2474 -170.5644 60.30 42.00 18.30 283605 SMO 2009 08 20 22 34 00 6501-66 S co CCGG 55.570 -999.990 ... V2 2009 09 22 11 45 00 -14.2474 -170.5644 60.30 42.00 18.30 283606 SMO 2009 08 28 00 40 00 361-99 S co CCGG 64.720 -999.990 ... V2 2009 09 22 13 02 00 -14.2474 -170.5644 60.30 42.00 18.30 283609 SMO 2009 08 28 00 40 00 362-99 S co CCGG 64.990 -999.990 ... V2 2009 09 22 13 18 00 -14.2474 -170.5644 60.30 42.00 18.30 283610 SMO 2009 08 28 01 15 00 3555-99 G co CCGG 66.590 -999.990 N.. V2 2009 09 22 12 31 00 -14.2474 -170.5644 47.00 42.00 5.00 283607 SMO 2009 08 28 01 15 00 3556-99 G co CCGG 66.140 -999.990 N.. V2 2009 09 22 12 47 00 -14.2474 -170.5644 47.00 42.00 5.00 283608 SMO 2009 09 04 00 37 00 749-99 G co CCGG 58.420 -999.990 N.. R5 2009 09 22 15 35 00 -14.2474 -170.5644 47.00 42.00 5.00 283601 SMO 2009 09 04 00 37 00 750-99 G co CCGG 58.990 -999.990 N.. R5 2009 09 22 15 49 00 -14.2474 -170.5644 47.00 42.00 5.00 283602 SMO 2009 09 04 00 39 00 2751-99 S co CCGG 56.540 -999.990 ... R5 2009 09 22 12 29 00 -14.2474 -170.5644 60.30 42.00 18.30 283599 SMO 2009 09 04 00 39 00 2752-99 S co CCGG 56.270 -999.990 ... R5 2009 09 22 12 44 00 -14.2474 -170.5644 60.30 42.00 18.30 283600 SMO 2009 09 11 00 53 00 1138-99 G co CCGG 60.570 -999.990 N.. V2 2009 09 28 14 12 00 -14.2474 -170.5644 47.00 42.00 5.00 284104 SMO 2009 09 11 00 53 00 3198-99 G co CCGG 60.620 -999.990 N.. V2 2009 09 28 14 28 00 -14.2474 -170.5644 47.00 42.00 5.00 284105 SMO 2009 09 11 02 38 00 4399-99 S co CCGG 60.120 -999.990 ... V2 2009 09 28 13 42 00 -14.2474 -170.5644 60.30 42.00 18.30 284106 SMO 2009 09 11 02 38 00 6342-66 S co CCGG 59.730 -999.990 ... V2 2009 09 28 13 57 00 -14.2474 -170.5644 60.30 42.00 18.30 284107 SMO 2009 09 17 19 39 00 2970-99 S co CCGG 58.740 -999.990 ... V2 2009 10 01 13 53 00 -14.2474 -170.5644 60.30 42.00 18.30 284392 SMO 2009 09 17 19 39 00 2986-99 S co CCGG 58.730 -999.990 ... V2 2009 10 01 14 09 00 -14.2474 -170.5644 60.30 42.00 18.30 284393 SMO 2009 09 17 23 08 00 1217-99 G co CCGG 60.440 -999.990 N.. V2 2009 10 01 14 39 00 -14.2474 -170.5644 47.00 42.00 5.00 284395 SMO 2009 09 17 23 08 00 4223-99 G co CCGG 60.710 -999.990 N.. V2 2009 10 01 14 24 00 -14.2474 -170.5644 47.00 42.00 5.00 284394 SMO 2009 10 23 00 38 00 2348-99 S co CCGG 61.530 -999.990 ... V2 2009 11 24 11 17 00 -14.2474 -170.5644 60.30 42.00 18.30 286464 SMO 2009 10 23 00 38 00 3508-99 S co CCGG 61.730 -999.990 ... V2 2009 11 24 11 32 00 -14.2474 -170.5644 60.30 42.00 18.30 286465 SMO 2009 10 23 01 30 00 1994-99 G co CCGG 66.870 -999.990 N.. V2 2009 11 24 11 48 00 -14.2474 -170.5644 47.00 42.00 5.00 286460 SMO 2009 10 23 01 30 00 2742-99 G co CCGG 65.760 -999.990 N.. V2 2009 11 24 12 03 00 -14.2474 -170.5644 47.00 42.00 5.00 286461 SMO 2009 10 30 00 40 00 3222-99 S co CCGG 63.670 -999.990 ... V2 2009 11 24 11 02 00 -14.2474 -170.5644 60.30 42.00 18.30 286467 SMO 2009 10 30 00 40 00 4877-99 S co CCGG 63.490 -999.990 ... V2 2009 11 24 10 46 00 -14.2474 -170.5644 60.30 42.00 18.30 286466 SMO 2009 10 30 00 55 00 3319-99 G co CCGG 65.270 -999.990 N.. V2 2009 11 24 09 29 00 -14.2474 -170.5644 47.00 42.00 5.00 286463 SMO 2009 10 30 00 55 00 4527-99 G co CCGG 65.080 -999.990 N.. V2 2009 11 24 09 14 00 -14.2474 -170.5644 47.00 42.00 5.00 286462 SMO 2009 11 06 12 34 56 1011-99 G co CCGG 62.250 -999.990 N.. V2 2009 12 04 14 11 00 -14.2474 -170.5644 47.00 42.00 5.00 286911 SMO 2009 11 06 12 34 56 4905-99 G co CCGG 62.280 -999.990 N.. V2 2009 12 04 14 27 00 -14.2474 -170.5644 47.00 42.00 5.00 286912 SMO 2009 11 06 21 39 00 1769-99 S co CCGG 60.660 -999.990 ... V2 2009 12 04 13 41 00 -14.2474 -170.5644 60.30 42.00 18.30 286913 SMO 2009 11 06 21 39 00 3390-99 S co CCGG 60.870 -999.990 ... V2 2009 12 04 13 56 00 -14.2474 -170.5644 60.30 42.00 18.30 286914 SMO 2009 11 12 21 38 00 1409-99 S co CCGG 58.670 -999.990 ... V2 2010 01 07 16 15 00 -14.2474 -170.5644 60.30 42.00 18.30 288127 SMO 2009 11 12 21 38 00 3968-99 S co CCGG 58.810 -999.990 ... V2 2010 01 07 16 00 00 -14.2474 -170.5644 60.30 42.00 18.30 288126 SMO 2009 11 12 22 24 00 2136-99 G co CCGG 61.710 -999.990 N.. V2 2010 01 07 14 12 00 -14.2474 -170.5644 47.00 42.00 5.00 288129 SMO 2009 11 12 22 24 00 831-99 G co CCGG 68.110 -999.990 N.. V2 2010 01 07 13 57 00 -14.2474 -170.5644 47.00 42.00 5.00 288128 SMO 2009 11 28 00 40 00 2527-99 S co CCGG 59.180 -999.990 ... V2 2010 01 13 15 19 00 -14.2474 -170.5644 60.30 42.00 18.30 288515 SMO 2009 11 28 00 40 00 2528-99 S co CCGG 58.780 -999.990 ... V2 2010 01 13 15 34 00 -14.2474 -170.5644 60.30 42.00 18.30 288516 SMO 2009 12 04 23 05 00 3449-99 G co CCGG 66.910 -999.990 N.. V2 2010 01 13 14 48 00 -14.2474 -170.5644 47.00 42.00 5.00 288519 SMO 2009 12 04 23 05 00 3450-99 G co CCGG 66.680 -999.990 N.. V2 2010 01 13 15 04 00 -14.2474 -170.5644 47.00 42.00 5.00 288520 SMO 2009 12 04 23 39 00 23-99 S co CCGG 57.890 -999.990 ... V2 2010 02 08 10 53 00 -14.2474 -170.5644 60.30 42.00 18.30 289501 SMO 2009 12 04 23 39 00 24-99 S co CCGG 57.370 -999.990 ... V2 2010 02 08 11 08 00 -14.2474 -170.5644 60.30 42.00 18.30 289502 SMO 2009 12 11 20 38 00 477-99 S co CCGG 58.400 -999.990 ... V2 2010 02 05 15 10 00 -14.2474 -170.5644 60.30 42.00 18.30 289499 SMO 2009 12 11 20 38 00 478-99 S co CCGG 59.150 -999.990 ... V2 2010 02 05 15 25 00 -14.2474 -170.5644 60.30 42.00 18.30 289500 SMO 2009 12 11 21 46 00 1683-99 G co CCGG 62.520 -999.990 N.. V2 2010 02 03 17 47 00 -14.2474 -170.5644 47.00 42.00 5.00 289507 SMO 2009 12 11 21 46 00 1684-99 G co CCGG 69.530 -999.990 N.. V2 2010 02 03 18 03 00 -14.2474 -170.5644 47.00 42.00 5.00 289508 SMO 2009 12 18 22 00 00 4743-99 G co CCGG 54.890 -999.990 N.. V2 2010 02 05 12 06 00 -14.2474 -170.5644 47.00 42.00 5.00 289509 SMO 2009 12 18 22 00 00 4744-99 G co CCGG 54.930 -999.990 N.. V2 2010 02 05 12 22 00 -14.2474 -170.5644 47.00 42.00 5.00 289510 SMO 2009 12 18 22 25 00 6537-66 S co CCGG 55.270 -999.990 ... V2 2010 02 05 12 37 00 -14.2474 -170.5644 60.30 42.00 18.30 289511 SMO 2009 12 18 22 25 00 6538-66 S co CCGG 53.740 -999.990 ... V2 2010 02 05 12 52 00 -14.2474 -170.5644 60.30 42.00 18.30 289512 SMO 2009 12 24 20 40 00 6037-66 S co CCGG 50.800 -999.990 ... V2 2010 02 12 16 02 00 -14.2474 -170.5644 60.30 42.00 18.30 289985 SMO 2009 12 24 20 40 00 6038-66 S co CCGG 50.000 -999.990 ... V2 2010 02 12 16 17 00 -14.2474 -170.5644 60.30 42.00 18.30 289986 SMO 2009 12 24 21 14 00 2054-99 G co CCGG 53.150 -999.990 N.. V2 2010 02 05 14 24 00 -14.2474 -170.5644 47.00 42.00 5.00 289506 SMO 2009 12 24 21 14 00 609-99 G co CCGG 52.990 -999.990 N.. V2 2010 02 05 14 09 00 -14.2474 -170.5644 47.00 42.00 5.00 289505 SMO 2009 12 30 20 40 00 2921-99 S co CCGG 53.740 -999.990 ... V2 2010 02 05 14 40 00 -14.2474 -170.5644 60.30 42.00 18.30 289503 SMO 2009 12 30 20 40 00 6098-66 S co CCGG 53.680 -999.990 ... V2 2010 02 05 14 55 00 -14.2474 -170.5644 60.30 42.00 18.30 289504 SMO 2010 01 08 00 38 00 1252-99 S co CCGG 50.560 -999.990 ... V2 2010 02 12 14 15 00 -14.2474 -170.5644 60.30 42.00 18.30 289953 SMO 2010 01 08 00 38 00 4257-99 S co CCGG 50.640 -999.990 ... V2 2010 02 12 14 00 00 -14.2474 -170.5644 60.30 42.00 18.30 289952 SMO 2010 01 08 01 30 00 3597-99 G co CCGG 50.220 -999.990 N.. V2 2010 02 12 13 45 00 -14.2474 -170.5644 47.00 42.00 5.00 289955 SMO 2010 01 08 01 30 00 3725-99 G co CCGG 50.060 -999.990 N.. V2 2010 02 12 13 29 00 -14.2474 -170.5644 47.00 42.00 5.00 289954 SMO 2010 01 22 21 39 00 2100-99 S co CCGG 53.050 -999.990 ... V2 2010 03 12 13 57 00 -14.2474 -170.5644 60.30 42.00 18.30 291660 SMO 2010 01 22 21 39 00 4911-99 S co CCGG 51.860 -999.990 ... V2 2010 03 12 14 12 00 -14.2474 -170.5644 60.30 42.00 18.30 291661 SMO 2010 01 22 22 17 00 3173-99 G co CCGG 56.940 -999.990 N.. V2 2010 03 12 13 26 00 -14.2474 -170.5644 47.00 42.00 5.00 291664 SMO 2010 01 22 22 17 00 4388-99 G co CCGG 56.590 -999.990 N.. V2 2010 03 12 13 42 00 -14.2474 -170.5644 47.00 42.00 5.00 291665 SMO 2010 01 28 21 38 00 1335-99 S co CCGG 63.100 -999.990 ... V2 2010 03 12 12 56 00 -14.2474 -170.5644 60.30 42.00 18.30 291658 SMO 2010 01 28 21 38 00 2745-99 S co CCGG 62.810 -999.990 ... V2 2010 03 12 13 11 00 -14.2474 -170.5644 60.30 42.00 18.30 291659 SMO 2010 01 28 22 10 00 4740-99 G co CCGG 65.160 -999.990 N.. V2 2010 03 12 12 25 00 -14.2474 -170.5644 47.00 42.00 5.00 291662 SMO 2010 01 28 22 10 00 4994-99 G co CCGG 65.040 -999.990 N.. V2 2010 03 12 12 40 00 -14.2474 -170.5644 47.00 42.00 5.00 291663 SMO 2010 02 05 19 57 00 857-99 G co CCGG 45.680 -999.990 N.. V2 2010 03 15 13 09 00 -14.2474 -170.5644 47.00 42.00 5.00 291666 SMO 2010 02 05 19 57 00 858-99 G co CCGG 44.980 -999.990 N.. V2 2010 03 15 13 25 00 -14.2474 -170.5644 47.00 42.00 5.00 291667 SMO 2010 02 05 20 39 00 421-99 S co CCGG 42.970 -999.990 ... V2 2010 03 15 12 39 00 -14.2474 -170.5644 60.30 42.00 18.30 291668 SMO 2010 02 05 20 39 00 422-99 S co CCGG 42.060 -999.990 ... V2 2010 03 15 12 54 00 -14.2474 -170.5644 60.30 42.00 18.30 291669 SMO 2010 02 18 20 41 00 1966-99 S co CCGG 63.870 -999.990 ... V2 2010 04 01 17 03 00 -14.2474 -170.5644 60.30 42.00 18.30 292747 SMO 2010 02 18 20 41 00 589-99 S co CCGG 64.030 -999.990 ... V2 2010 04 01 16 48 00 -14.2474 -170.5644 60.30 42.00 18.30 292746 SMO 2010 02 18 21 05 00 1101-99 G co CCGG 66.810 -999.990 N.. V2 2010 04 01 16 17 00 -14.2474 -170.5644 47.00 42.00 5.00 292744 SMO 2010 02 18 21 05 00 1118-99 G co CCGG 69.580 -999.990 N.. V2 2010 04 01 16 32 00 -14.2474 -170.5644 47.00 42.00 5.00 292745 SMO 2010 02 25 21 40 00 1370-99 S co CCGG 58.890 -999.990 ... V2 2010 04 02 10 19 00 -14.2474 -170.5644 60.30 42.00 18.30 292749 SMO 2010 02 25 21 40 00 2964-99 S co CCGG 59.650 -999.990 ... V2 2010 04 02 10 04 00 -14.2474 -170.5644 60.30 42.00 18.30 292748 SMO 2010 02 25 22 00 00 1596-99 G co CCGG 61.840 -999.990 N.. V2 2010 04 02 10 50 00 -14.2474 -170.5644 47.00 42.00 5.00 292751 SMO 2010 02 25 22 00 00 874-99 G co CCGG 62.980 -999.990 N.. V2 2010 04 02 10 35 00 -14.2474 -170.5644 47.00 42.00 5.00 292750 SMO 2010 03 05 20 38 00 2135-99 S co CCGG 52.900 -999.990 ... V2 2010 04 08 11 43 00 -14.2474 -170.5644 60.30 42.00 18.30 293348 SMO 2010 03 05 20 38 00 570-99 S co CCGG 53.380 -999.990 ... V2 2010 04 08 11 59 00 -14.2474 -170.5644 60.30 42.00 18.30 293349 SMO 2010 03 05 22 21 00 3154-99 G co CCGG 58.280 -999.990 N.. V2 2010 04 08 12 14 00 -14.2474 -170.5644 47.00 42.00 5.00 293350 SMO 2010 03 05 22 21 00 502-99 G co CCGG 57.540 -999.990 N.. V2 2010 04 08 12 29 00 -14.2474 -170.5644 47.00 42.00 5.00 293351 SMO 2010 03 11 20 40 00 2981-99 S co CCGG 57.250 -999.990 ... V2 2010 04 08 10 57 00 -14.2474 -170.5644 60.30 42.00 18.30 293347 SMO 2010 03 11 20 40 00 6098-66 S co CCGG 57.680 -999.990 ... V2 2010 04 08 10 42 00 -14.2474 -170.5644 60.30 42.00 18.30 293346 SMO 2010 03 11 21 19 00 1233-99 G co CCGG 59.040 -999.990 N.. V2 2010 04 08 11 13 00 -14.2474 -170.5644 47.00 42.00 5.00 293344 SMO 2010 03 11 21 19 00 3141-99 G co CCGG 58.420 -999.990 N.. V2 2010 04 08 11 28 00 -14.2474 -170.5644 47.00 42.00 5.00 293345 SMO 2010 03 18 19 40 00 2907-99 S co CCGG 53.940 -999.990 ... V2 2010 04 07 12 16 00 -14.2474 -170.5644 60.30 42.00 18.30 293338 SMO 2010 03 18 19 40 00 4034-99 S co CCGG 53.180 -999.990 ... V2 2010 04 07 12 31 00 -14.2474 -170.5644 60.30 42.00 18.30 293339 SMO 2010 03 18 20 45 00 3767-99 G co CCGG 56.560 -999.990 N.. V2 2010 04 07 12 47 00 -14.2474 -170.5644 47.00 42.00 5.00 293340 SMO 2010 03 18 20 45 00 667-99 G co CCGG 56.100 -999.990 N.. V2 2010 04 07 13 02 00 -14.2474 -170.5644 47.00 42.00 5.00 293341 SMO 2010 04 11 00 43 00 3669-99 G co CCGG 53.920 -999.990 N.. V2 2010 05 17 11 09 00 -14.2474 -170.5644 47.00 42.00 5.00 295274 SMO 2010 04 11 00 43 00 3877-99 G co CCGG 53.910 -999.990 N.. V2 2010 05 17 11 25 00 -14.2474 -170.5644 47.00 42.00 5.00 295275 SMO 2010 06 25 00 27 00 6137-66 S co CCGG 57.290 -999.990 ... V2 2010 07 13 16 08 00 -14.2474 -170.5644 60.30 42.00 18.30 300098 SMO 2010 06 25 00 27 00 786-99 S co CCGG 56.830 -999.990 ... V2 2010 07 13 16 24 00 -14.2474 -170.5644 60.30 42.00 18.30 300099 SMO 2010 06 25 02 02 00 1816-99 G co CCGG 59.170 -999.990 N.. R5 2010 07 14 12 36 00 -14.2474 -170.5644 47.00 42.00 5.00 300097 SMO 2010 06 25 02 02 00 4230-99 G co CCGG 58.970 -999.990 N.. R5 2010 07 14 12 21 00 -14.2474 -170.5644 47.00 42.00 5.00 300096 SMO 2010 07 03 02 51 00 3895-99 G co CCGG 58.340 -999.990 N.. V2 2010 07 27 10 53 00 -14.2474 -170.5644 47.00 42.00 5.00 300856 SMO 2010 07 03 02 51 00 6076-66 G co CCGG 58.870 -999.990 N.. V2 2010 07 27 11 09 00 -14.2474 -170.5644 47.00 42.00 5.00 300857 SMO 2010 07 03 04 30 00 2164-99 S co CCGG 56.550 -999.990 ... V2 2010 07 27 11 24 00 -14.2474 -170.5644 60.30 42.00 18.30 300858 SMO 2010 07 03 04 30 00 2691-99 S co CCGG 57.380 -999.990 ... V2 2010 07 27 11 39 00 -14.2474 -170.5644 60.30 42.00 18.30 300859 SMO 2010 07 09 03 20 00 2629-99 G co CCGG 54.390 -999.990 N.. V2 2010 07 27 10 38 00 -14.2474 -170.5644 47.00 42.00 5.00 300863 SMO 2010 07 09 03 20 00 4627-99 G co CCGG 54.630 -999.990 N.. V2 2010 07 27 10 23 00 -14.2474 -170.5644 47.00 42.00 5.00 300862 SMO 2010 07 09 04 29 00 1130-99 S co CCGG 52.670 -999.990 ... V2 2010 07 27 09 14 00 -14.2474 -170.5644 60.30 42.00 18.30 300860 SMO 2010 07 09 04 29 00 3652-99 S co CCGG 52.730 -999.990 ... V2 2010 07 27 09 30 00 -14.2474 -170.5644 60.30 42.00 18.30 300861 SMO 2010 07 15 22 24 00 1545-99 G co CCGG 60.480 -999.990 N.. V2 2010 08 03 14 10 00 -14.2474 -170.5644 47.00 42.00 5.00 301061 SMO 2010 07 15 22 24 00 669-99 G co CCGG 60.060 -999.990 N.. V2 2010 08 03 14 25 00 -14.2474 -170.5644 47.00 42.00 5.00 301062 SMO 2010 07 16 01 37 00 1759-99 S co CCGG 55.620 -999.990 ... V2 2010 08 03 13 40 00 -14.2474 -170.5644 60.30 42.00 18.30 301063 SMO 2010 07 16 01 37 00 576-99 S co CCGG 56.600 -999.990 ... V2 2010 08 03 13 55 00 -14.2474 -170.5644 60.30 42.00 18.30 301064 SMO 2010 07 21 01 11 00 2108-99 G co CCGG 59.030 -999.990 N.. V2 2010 08 05 11 32 00 -14.2474 -170.5644 47.00 42.00 5.00 301054 SMO 2010 07 21 01 11 00 4321-99 G co CCGG 59.130 -999.990 N.. V2 2010 08 05 11 16 00 -14.2474 -170.5644 47.00 42.00 5.00 301053 SMO 2010 07 21 02 22 00 2506-99 S co CCGG 56.220 -999.990 ... V2 2010 08 05 12 36 00 -14.2474 -170.5644 60.30 42.00 18.30 301056 SMO 2010 07 21 02 22 00 4439-99 S co CCGG 55.790 -999.990 ... V2 2010 08 05 12 20 00 -14.2474 -170.5644 60.30 42.00 18.30 301055 SMO 2010 07 29 04 26 00 3496-99 G co CCGG 55.190 -999.990 N.. V2 2010 08 16 11 30 00 -14.2474 -170.5644 47.00 42.00 5.00 301870 SMO 2010 07 29 04 26 00 446-99 G co CCGG 55.130 -999.990 N.. V2 2010 08 16 11 45 00 -14.2474 -170.5644 47.00 42.00 5.00 301871 SMO 2010 07 29 06 39 00 6089-66 S co CCGG 55.860 -999.990 ... V2 2010 08 16 10 59 00 -14.2474 -170.5644 60.30 42.00 18.30 301868 SMO 2010 07 29 06 39 00 6090-66 S co CCGG 55.450 -999.990 ... V2 2010 08 16 11 15 00 -14.2474 -170.5644 60.30 42.00 18.30 301869 SMO 2010 08 05 05 01 00 1449-99 G co CCGG 56.230 -999.990 N.. R5 2010 08 26 14 43 00 -14.2474 -170.5644 47.00 42.00 5.00 302667 SMO 2010 08 05 05 01 00 863-99 G co CCGG 56.030 -999.990 N.. R5 2010 08 26 14 58 00 -14.2474 -170.5644 47.00 42.00 5.00 302668 SMO 2010 08 05 06 24 00 2126-99 S co CCGG 56.030 -999.990 ... R5 2010 08 26 15 13 00 -14.2474 -170.5644 60.30 42.00 18.30 302665 SMO 2010 08 05 06 24 00 2568-99 S co CCGG 56.110 -999.990 ... R5 2010 08 26 15 28 00 -14.2474 -170.5644 60.30 42.00 18.30 302666 SMO 2010 08 11 04 22 00 1086-99 G co CCGG 54.510 -999.990 N.. V2 2010 08 27 14 48 00 -14.2474 -170.5644 47.00 42.00 5.00 302689 SMO 2010 08 11 04 22 00 3266-99 G co CCGG 53.800 -999.990 N.. V2 2010 08 27 15 04 00 -14.2474 -170.5644 47.00 42.00 5.00 302690 SMO 2010 08 11 06 21 00 3297-99 S co CCGG 54.070 -999.990 ... V2 2010 08 27 14 18 00 -14.2474 -170.5644 60.30 42.00 18.30 302687 SMO 2010 08 11 06 21 00 4566-99 S co CCGG 54.130 -999.990 ... V2 2010 08 27 14 33 00 -14.2474 -170.5644 60.30 42.00 18.30 302688 SMO 2010 08 20 03 06 00 2734-99 G co CCGG 62.580 -999.990 N.. R5 2010 09 08 13 58 00 -14.2474 -170.5644 47.00 42.00 5.00 303293 SMO 2010 08 20 03 06 00 4958-99 G co CCGG 62.080 -999.990 N.. R5 2010 09 08 14 13 00 -14.2474 -170.5644 47.00 42.00 5.00 303294 SMO 2010 08 20 04 40 00 1034-22 S co CCGG 59.750 -999.990 ... R5 2010 09 08 11 45 00 -14.2474 -170.5644 60.30 42.00 18.30 303292 SMO 2010 08 20 04 40 00 2560-99 S co CCGG 60.270 -999.990 ... R5 2010 09 08 11 30 00 -14.2474 -170.5644 60.30 42.00 18.30 303291 SMO 2010 08 28 03 32 00 3640-99 G co CCGG 57.340 -999.990 N.. V2 2010 09 14 13 56 00 -14.2474 -170.5644 47.00 42.00 5.00 303710 SMO 2010 08 28 03 32 00 391-99 G co CCGG 56.900 -999.990 N.. V2 2010 09 14 13 40 00 -14.2474 -170.5644 47.00 42.00 5.00 303709 SMO 2010 08 28 05 38 00 3639-99 S co CCGG 54.970 -999.990 ... V2 2010 09 14 14 26 00 -14.2474 -170.5644 60.30 42.00 18.30 303708 SMO 2010 08 28 05 38 00 392-99 S co CCGG 55.570 -999.990 ... V2 2010 09 14 14 11 00 -14.2474 -170.5644 60.30 42.00 18.30 303707 SMO 2010 09 02 04 34 00 1446-99 G co CCGG 56.640 -999.990 N.. R5 2010 10 05 12 37 00 -14.2474 -170.5644 47.00 42.00 5.00 304968 SMO 2010 09 02 04 34 00 4542-99 G co CCGG 56.520 -999.990 N.. R5 2010 10 05 12 52 00 -14.2474 -170.5644 47.00 42.00 5.00 304969 SMO 2010 09 02 06 13 00 1445-99 S co CCGG 57.280 -999.990 ... R5 2010 10 05 13 21 00 -14.2474 -170.5644 60.30 42.00 18.30 304967 SMO 2010 09 02 06 13 00 4541-99 S co CCGG 56.080 -999.990 ... R5 2010 10 05 13 06 00 -14.2474 -170.5644 60.30 42.00 18.30 304966 SMO 2010 09 10 03 05 00 2526-99 G co CCGG 60.550 -999.990 N.. R5 2010 10 04 15 12 00 -14.2474 -170.5644 47.00 42.00 5.00 304949 SMO 2010 09 10 03 05 00 274-99 G co CCGG 60.530 -999.990 N.. R5 2010 10 04 14 58 00 -14.2474 -170.5644 47.00 42.00 5.00 304948 SMO 2010 09 10 04 33 00 1574-99 S co CCGG 61.910 -999.990 ... R5 2010 10 04 15 42 00 -14.2474 -170.5644 60.30 42.00 18.30 304947 SMO 2010 09 10 04 33 00 3725-99 S co CCGG 59.830 -999.990 ... R5 2010 10 04 15 27 00 -14.2474 -170.5644 60.30 42.00 18.30 304946 SMO 2010 09 16 04 14 00 2721-99 G co CCGG 71.780 -999.990 N.. R5 2010 10 11 13 11 00 -14.2474 -170.5644 47.00 42.00 5.00 305377 SMO 2010 09 16 04 14 00 4643-99 G co CCGG 71.300 -999.990 N.. R5 2010 10 11 13 26 00 -14.2474 -170.5644 47.00 42.00 5.00 305378 SMO 2010 09 16 07 38 00 3909-99 S co CCGG 67.590 -999.990 ... R5 2010 10 11 13 41 00 -14.2474 -170.5644 60.30 42.00 18.30 305375 SMO 2010 09 16 07 38 00 4399-99 S co CCGG 66.460 -999.990 ... R5 2010 10 11 13 55 00 -14.2474 -170.5644 60.30 42.00 18.30 305376 SMO 2010 09 23 03 08 00 2466-99 S co CCGG 70.450 -999.990 ... V2 2010 10 25 15 36 00 -14.2474 -170.5644 60.30 42.00 18.30 306283 SMO 2010 09 23 03 08 00 4429-99 S co CCGG 70.650 -999.990 ... V2 2010 10 25 15 21 00 -14.2474 -170.5644 60.30 42.00 18.30 306284 SMO 2010 09 23 03 56 00 3338-99 G co CCGG 71.680 -999.990 N.. V2 2010 10 25 16 06 00 -14.2474 -170.5644 47.00 42.00 5.00 306370 SMO 2010 09 23 03 56 00 4308-99 G co CCGG 71.800 -999.990 N.. V2 2010 10 25 15 51 00 -14.2474 -170.5644 47.00 42.00 5.00 306369 SMO 2010 10 01 01 27 00 3887-99 S co CCGG 67.890 -999.990 ... V2 2010 10 29 16 39 00 -14.2474 -170.5644 60.30 42.00 18.30 306594 SMO 2010 10 01 01 27 00 4322-99 S co CCGG 67.960 -999.990 ... V2 2010 10 29 16 24 00 -14.2474 -170.5644 60.30 42.00 18.30 306593 SMO 2010 10 01 02 18 00 2449-99 G co CCGG 72.360 -999.990 N.. V2 2010 10 29 16 55 00 -14.2474 -170.5644 47.00 42.00 5.00 306591 SMO 2010 10 01 02 18 00 516-99 G co CCGG 71.810 -999.990 N.. V2 2010 10 29 17 10 00 -14.2474 -170.5644 47.00 42.00 5.00 306592 SMO 2010 10 12 01 38 00 1062-99 S co CCGG 67.040 -999.990 ... V2 2010 11 01 11 40 00 -14.2474 -170.5644 60.30 42.00 18.30 306597 SMO 2010 10 12 01 38 00 6156-66 S co CCGG 67.630 -999.990 ... V2 2010 11 01 11 25 00 -14.2474 -170.5644 60.30 42.00 18.30 306598 SMO 2010 10 12 02 10 00 4110-99 G co CCGG 70.900 -999.990 N.. V2 2010 11 01 11 10 00 -14.2474 -170.5644 47.00 42.00 5.00 306595 SMO 2010 10 12 02 10 00 4700-99 G co CCGG 70.920 -999.990 N.. V2 2010 11 01 10 54 00 -14.2474 -170.5644 47.00 42.00 5.00 306596 SMO 2010 10 22 00 38 00 3058-99 S co CCGG 79.640 -999.990 ... V2 2010 11 05 13 51 00 -14.2474 -170.5644 60.30 42.00 18.30 306988 SMO 2010 10 22 00 38 00 4103-99 S co CCGG 79.760 -999.990 ... V2 2010 11 05 13 36 00 -14.2474 -170.5644 60.30 42.00 18.30 306987 SMO 2010 10 22 00 53 00 2794-99 G co CCGG 84.780 -999.990 N.. V2 2010 11 05 12 35 00 -14.2474 -170.5644 47.00 42.00 5.00 306993 SMO 2010 10 22 00 53 00 424-99 G co CCGG 85.070 -999.990 N.. V2 2010 11 05 12 50 00 -14.2474 -170.5644 47.00 42.00 5.00 306994 SMO 2010 10 29 00 30 00 1920-99 G co CCGG 79.000 -999.990 N.. R5 2010 11 15 15 11 00 -14.2474 -170.5644 47.00 42.00 5.00 307533 SMO 2010 10 29 00 30 00 5176-99 G co CCGG 78.760 -999.990 N.. R5 2010 11 15 14 56 00 -14.2474 -170.5644 47.00 42.00 5.00 307532 SMO 2010 10 29 01 32 00 1372-99 S co CCGG 75.150 -999.990 ... R5 2010 11 15 15 25 00 -14.2474 -170.5644 60.30 42.00 18.30 307518 SMO 2010 10 29 01 32 00 2468-99 S co CCGG 75.230 -999.990 ... R5 2010 11 15 15 40 00 -14.2474 -170.5644 60.30 42.00 18.30 307519 SMO 2010 11 04 21 06 00 2164-99 G co CCGG 65.540 -999.990 N.. R5 2010 12 21 13 05 00 -14.2474 -170.5644 47.00 42.00 5.00 309372 SMO 2010 11 04 21 06 00 4141-99 G co CCGG 65.300 -999.990 N.. R5 2010 12 21 12 51 00 -14.2474 -170.5644 47.00 42.00 5.00 309373 SMO 2010 11 05 02 42 00 249-99 S co CCGG 65.190 -999.990 ... R5 2010 12 21 12 36 00 -14.2474 -170.5644 60.30 42.00 18.30 309370 SMO 2010 11 05 02 42 00 3786-99 S co CCGG 65.340 -999.990 ... R5 2010 12 21 12 21 00 -14.2474 -170.5644 60.30 42.00 18.30 309371 SMO 2010 11 15 23 30 00 3041-99 G co CCGG 76.900 -999.990 N.. V2 2010 12 21 11 09 00 -14.2474 -170.5644 47.00 42.00 5.00 309414 SMO 2010 11 15 23 30 00 5127-99 G co CCGG 76.400 -999.990 N.. V2 2010 12 21 11 25 00 -14.2474 -170.5644 47.00 42.00 5.00 309415 SMO 2010 11 26 22 42 00 4839-99 G co CCGG 71.980 -999.990 N.. V2 2010 12 29 14 05 00 -14.2474 -170.5644 47.00 42.00 5.00 310092 SMO 2010 11 26 22 42 00 5141-99 G co CCGG 72.990 -999.990 N.. V2 2010 12 29 14 21 00 -14.2474 -170.5644 47.00 42.00 5.00 310093 SMO 2010 12 02 22 36 00 4840-99 S co CCGG 66.000 -999.990 ... V2 2010 12 29 15 59 00 -14.2474 -170.5644 60.30 42.00 18.30 310074 SMO 2010 12 02 22 36 00 5142-99 S co CCGG 66.890 -999.990 ... V2 2010 12 29 15 43 00 -14.2474 -170.5644 60.30 42.00 18.30 310075 SMO 2010 12 02 22 38 00 237-99 G co CCGG 73.210 -999.990 N.. V2 2010 12 30 10 39 00 -14.2474 -170.5644 47.00 42.00 5.00 310073 SMO 2010 12 02 22 38 00 451-99 G co CCGG 73.190 -999.990 N.. V2 2010 12 30 10 23 00 -14.2474 -170.5644 47.00 42.00 5.00 310072 SMO 2010 12 08 00 50 00 2825-99 G co CCGG 64.120 -999.990 N.. V2 2010 12 29 13 49 00 -14.2474 -170.5644 47.00 42.00 5.00 310057 SMO 2010 12 08 00 50 00 3644-99 G co CCGG 65.110 -999.990 N.. V2 2010 12 29 13 33 00 -14.2474 -170.5644 47.00 42.00 5.00 310056 SMO 2010 12 08 13 45 00 1760-99 S co CCGG 58.700 -999.990 ... V2 2010 12 29 13 16 00 -14.2474 -170.5644 60.30 42.00 18.30 310058 SMO 2010 12 08 13 45 00 4657-99 S co CCGG 59.030 -999.990 ... V2 2010 12 29 13 00 00 -14.2474 -170.5644 60.30 42.00 18.30 310059 SMO 2010 12 15 22 43 00 1275-99 S co CCGG 60.470 -999.990 ... V2 2011 01 04 16 37 00 -14.2474 -170.5644 60.30 42.00 18.30 310267 SMO 2010 12 15 22 43 00 3992-99 S co CCGG 60.570 -999.990 ... V2 2011 01 04 16 21 00 -14.2474 -170.5644 60.30 42.00 18.30 310268 SMO 2010 12 16 00 05 00 2006-99 G co CCGG 83.060 -999.990 N.. V2 2011 01 04 15 48 00 -14.2474 -170.5644 47.00 42.00 5.00 310265 SMO 2010 12 16 00 05 00 4193-99 G co CCGG 83.190 -999.990 N.. V2 2011 01 04 16 05 00 -14.2474 -170.5644 47.00 42.00 5.00 310266 SMO 2010 12 22 12 34 56 5401-99 S co CCGG 59.910 -999.990 ... R5 2011 01 07 13 55 00 -14.2474 -170.5644 60.30 42.00 18.30 310608 SMO 2010 12 22 12 34 56 5402-99 S co CCGG 59.560 -999.990 ... R5 2011 01 07 14 10 00 -14.2474 -170.5644 60.30 42.00 18.30 310609 SMO 2010 12 22 22 40 00 5403-99 G co CCGG 64.720 -999.990 N.. R5 2011 01 07 14 25 00 -14.2474 -170.5644 47.00 42.00 5.00 310610 SMO 2010 12 22 22 40 00 5404-99 G co CCGG 64.690 -999.990 N.. R5 2011 01 07 14 39 00 -14.2474 -170.5644 47.00 42.00 5.00 310611 SMO 2010 12 28 09 38 00 4396-99 S co CCGG 58.070 -999.990 ... V2 2011 01 26 11 19 00 -14.2474 -170.5644 60.30 42.00 18.30 311188 SMO 2010 12 28 09 38 00 5409-99 S co CCGG 57.700 -999.990 ... V2 2011 01 26 11 35 00 -14.2474 -170.5644 60.30 42.00 18.30 311189 SMO 2011 01 05 20 10 00 1892-99 G co CCGG 63.440 -999.990 N.. V2 2011 01 18 14 01 00 -14.2474 -170.5644 47.00 42.00 5.00 311198 SMO 2011 01 05 20 10 00 3452-99 G co CCGG 63.120 -999.990 N.. V2 2011 01 18 14 18 00 -14.2474 -170.5644 47.00 42.00 5.00 311199 SMO 2011 01 05 21 30 00 4214-99 S co CCGG 60.980 -999.990 ... V2 2011 01 18 13 29 00 -14.2474 -170.5644 60.30 42.00 18.30 311196 SMO 2011 01 05 21 30 00 4429-99 S co CCGG 60.410 -999.990 ... V2 2011 01 18 13 45 00 -14.2474 -170.5644 60.30 42.00 18.30 311197 SMO 2011 01 12 15 00 00 2450-99 G co CCGG 90.200 -999.990 -.. V2 2011 02 15 12 34 00 -14.2474 -170.5644 47.00 42.00 5.00 312341 SMO 2011 01 12 15 00 00 447-99 G co CCGG 93.700 -999.990 +.. V2 2011 02 15 12 18 00 -14.2474 -170.5644 47.00 42.00 5.00 312340 SMO 2011 01 12 15 40 00 1860-99 S co CCGG 58.460 -999.990 ... V2 2011 02 15 12 50 00 -14.2474 -170.5644 60.30 42.00 18.30 312342 SMO 2011 01 12 15 40 00 2959-99 S co CCGG 59.080 -999.990 ... V2 2011 02 15 13 07 00 -14.2474 -170.5644 60.30 42.00 18.30 312343 SMO 2011 01 19 01 15 00 1013-99 S co CCGG 56.830 -999.990 ... V2 2011 02 15 15 00 00 -14.2474 -170.5644 60.30 42.00 18.30 312328 SMO 2011 01 19 01 15 00 3058-99 S co CCGG 56.340 -999.990 ... V2 2011 02 15 15 17 00 -14.2474 -170.5644 60.30 42.00 18.30 312329 SMO 2011 01 19 22 34 00 408-99 G co CCGG 61.860 -999.990 N.. V2 2011 02 15 14 44 00 -14.2474 -170.5644 47.00 42.00 5.00 312331 SMO 2011 01 19 22 34 00 4718-99 G co CCGG 61.940 -999.990 N.. V2 2011 02 15 14 28 00 -14.2474 -170.5644 47.00 42.00 5.00 312330 SMO 2011 01 27 12 34 56 1591-99 S co CCGG 61.540 -999.990 ... V2 2011 02 15 13 55 00 -14.2474 -170.5644 60.30 42.00 18.30 312324 SMO 2011 01 27 12 34 56 3060-99 S co CCGG 61.090 -999.990 ... V2 2011 02 15 14 12 00 -14.2474 -170.5644 60.30 42.00 18.30 312325 SMO 2011 01 27 21 16 00 1251-99 G co CCGG 69.480 -999.990 N.. V2 2011 02 15 13 39 00 -14.2474 -170.5644 47.00 42.00 5.00 312323 SMO 2011 01 27 21 16 00 2834-99 G co CCGG 69.130 -999.990 N.. V2 2011 02 15 13 23 00 -14.2474 -170.5644 47.00 42.00 5.00 312322 SMO 2011 02 02 00 40 00 183-99 S co CCGG 48.580 -999.990 ... V4 2011 03 03 15 38 00 -14.2474 -170.5644 60.30 42.00 18.30 313510 SMO 2011 02 02 00 40 00 4332-99 S co CCGG 48.090 -999.990 ... V4 2011 03 03 15 53 00 -14.2474 -170.5644 60.30 42.00 18.30 313511 SMO 2011 02 02 13 38 00 2350-99 G co CCGG 53.600 -999.990 N.. V2 2011 03 03 15 25 00 -14.2474 -170.5644 47.00 42.00 5.00 313508 SMO 2011 02 02 13 38 00 4745-99 G co CCGG 52.260 -999.990 N.. V2 2011 03 03 15 09 00 -14.2474 -170.5644 47.00 42.00 5.00 313509 SMO 2011 02 11 20 08 00 3699-99 S co CCGG 64.110 -999.990 ... V2 2011 03 03 14 04 00 -14.2474 -170.5644 60.30 42.00 18.30 313506 SMO 2011 02 11 20 08 00 590-99 S co CCGG 63.860 -999.990 ... V2 2011 03 03 14 20 00 -14.2474 -170.5644 60.30 42.00 18.30 313507 SMO 2011 02 11 21 17 00 4375-99 G co CCGG 75.540 -999.990 N.. V2 2011 03 03 14 53 00 -14.2474 -170.5644 47.00 42.00 5.00 313505 SMO 2011 02 11 21 17 00 4907-99 G co CCGG 76.970 -999.990 N.. V2 2011 03 03 14 37 00 -14.2474 -170.5644 47.00 42.00 5.00 313504 SMO 2011 02 23 13 40 00 4167-99 S co CCGG 56.060 -999.990 ... V2 2011 03 11 15 19 00 -14.2474 -170.5644 60.30 42.00 18.30 313972 SMO 2011 02 23 13 40 00 4179-99 S co CCGG 55.770 -999.990 ... V2 2011 03 11 15 35 00 -14.2474 -170.5644 60.30 42.00 18.30 313973 SMO 2011 02 23 22 20 00 1698-99 G co CCGG 66.850 -999.990 N.. V2 2011 03 11 15 51 00 -14.2474 -170.5644 47.00 42.00 5.00 313974 SMO 2011 02 23 22 20 00 3282-99 G co CCGG 66.340 -999.990 N.. V2 2011 03 11 16 07 00 -14.2474 -170.5644 47.00 42.00 5.00 313975 SMO 2011 03 04 20 40 00 1024-99 G co CCGG 63.020 -999.990 N.. V2 2011 03 21 14 35 00 -14.2474 -170.5644 47.00 42.00 5.00 314577 SMO 2011 03 04 20 40 00 2279-99 G co CCGG 63.490 -999.990 N.. V2 2011 03 21 14 51 00 -14.2474 -170.5644 47.00 42.00 5.00 314578 SMO 2011 03 10 20 24 00 1601-99 G co CCGG 54.590 -999.990 N.. V4 2011 03 31 14 15 00 -14.2474 -170.5644 47.00 42.00 5.00 314947 SMO 2011 03 10 20 24 00 3465-99 G co CCGG 54.770 -999.990 N.. V4 2011 03 31 14 31 00 -14.2474 -170.5644 47.00 42.00 5.00 314948 SMO 2011 03 16 20 28 00 2734-99 G co CCGG 54.240 -999.990 N.. V2 2011 04 05 14 20 00 -14.2474 -170.5644 47.00 42.00 5.00 315314 SMO 2011 03 20 21 34 00 4161-99 G co CCGG 59.140 -999.990 N.. V2 2011 04 18 15 20 00 -14.2474 -170.5644 47.00 42.00 5.00 316073 SMO 2011 04 06 20 55 00 1887-99 G co CCGG 62.240 -999.990 P.. V2 2011 04 18 13 40 00 -14.2474 -170.5644 47.00 42.00 5.00 316075 SMO 2011 04 06 20 55 00 6835-66 G co CCGG 54.220 -999.990 P.. V2 2011 04 18 13 24 00 -14.2474 -170.5644 47.00 42.00 5.00 316074 SMO 2011 04 14 21 45 00 228-99 G co CCGG 66.860 -999.990 N.. V2 2011 05 20 16 59 00 -14.2474 -170.5644 47.00 42.00 5.00 317977 SMO 2011 04 14 21 45 00 6780-66 G co CCGG 66.740 -999.990 N.. V2 2011 05 20 16 43 00 -14.2474 -170.5644 47.00 42.00 5.00 317976 SMO 2011 04 22 20 21 00 2744-99 G co CCGG 56.980 -999.990 N.. V4 2011 05 20 17 23 00 -14.2474 -170.5644 47.00 42.00 5.00 317979 SMO 2011 04 22 20 21 00 3853-99 G co CCGG 55.990 -999.990 N.. V4 2011 05 20 17 08 00 -14.2474 -170.5644 47.00 42.00 5.00 317978 SMO 2011 05 04 22 15 00 4415-99 G co CCGG 63.420 -999.990 N.. V4 2011 06 02 12 44 00 -14.2474 -170.5644 47.00 42.00 5.00 318417 SMO 2011 05 04 22 15 00 582-99 G co CCGG 63.330 -999.990 N.. V4 2011 06 02 12 29 00 -14.2474 -170.5644 47.00 42.00 5.00 318416 SMO 2011 05 15 00 32 00 1892-99 G co CCGG 63.030 -999.990 N.. V4 2011 06 02 12 14 00 -14.2474 -170.5644 47.00 42.00 5.00 318418 SMO 2011 05 25 21 20 00 3060-99 G co CCGG 63.100 -999.990 N.. V2 2011 06 06 15 24 00 -14.2474 -170.5644 47.00 42.00 5.00 318690 SMO 2011 05 25 21 20 00 3549-99 G co CCGG 63.790 -999.990 N.. V2 2011 06 06 15 08 00 -14.2474 -170.5644 47.00 42.00 5.00 318691 SMO 2011 05 25 23 45 00 2984-99 S co CCGG 53.550 -999.990 ... V2 2011 06 06 14 50 00 -14.2474 -170.5644 60.30 42.00 18.30 318688 SMO 2011 05 25 23 45 00 3902-99 S co CCGG 53.760 -999.990 ... V2 2011 06 06 14 34 00 -14.2474 -170.5644 60.30 42.00 18.30 318689 SMO 2011 06 01 21 00 00 3257-99 G co CCGG 57.820 -999.990 N.. V2 2011 06 24 14 30 00 -14.2474 -170.5644 47.00 42.00 5.00 319630 SMO 2011 06 01 21 00 00 4860-99 G co CCGG 57.870 -999.990 N.. V2 2011 06 24 14 13 00 -14.2474 -170.5644 47.00 42.00 5.00 319631 SMO 2011 06 11 21 28 00 1086-99 G co CCGG 53.340 -999.990 N.. V2 2011 06 24 15 02 00 -14.2474 -170.5644 47.00 42.00 5.00 319629 SMO 2011 06 11 21 28 00 4971-99 G co CCGG 53.180 -999.990 N.. V2 2011 06 24 14 46 00 -14.2474 -170.5644 47.00 42.00 5.00 319628 SMO 2011 06 15 20 14 00 1185-99 G co CCGG 55.580 -999.990 N.. V4 2011 07 07 15 28 00 -14.2474 -170.5644 47.00 42.00 5.00 320086 SMO 2011 06 15 20 14 00 4738-99 G co CCGG 54.480 -999.990 N.. V4 2011 07 07 15 43 00 -14.2474 -170.5644 47.00 42.00 5.00 320087 SMO 2011 06 15 21 35 00 2279-99 S co CCGG 51.130 -999.990 ... V4 2011 07 06 10 06 00 -14.2474 -170.5644 60.30 42.00 18.30 320080 SMO 2011 06 15 21 35 00 3287-99 S co CCGG 51.770 -999.990 ... V4 2011 07 06 10 21 00 -14.2474 -170.5644 60.30 42.00 18.30 320081 SMO 2011 06 22 22 35 00 3221-99 S co CCGG 51.770 -999.990 ... V4 2011 07 15 15 12 00 -14.2474 -170.5644 60.30 42.00 18.30 320455 SMO 2011 06 22 22 35 00 974-99 S co CCGG 52.940 -999.990 ... V4 2011 07 15 14 56 00 -14.2474 -170.5644 60.30 42.00 18.30 320454 SMO 2011 06 22 23 08 00 3326-99 G co CCGG 67.600 -999.990 N.. V4 2011 07 15 15 27 00 -14.2474 -170.5644 47.00 42.00 5.00 320456 SMO 2011 06 22 23 08 00 4370-99 G co CCGG 66.930 -999.990 N.. V4 2011 07 15 15 42 00 -14.2474 -170.5644 47.00 42.00 5.00 320457 SMO 2011 06 30 21 53 00 1875-99 G co CCGG 64.070 -999.990 N.. V4 2011 08 01 14 56 00 -14.2474 -170.5644 47.00 42.00 5.00 321432 SMO 2011 06 30 21 53 00 3811-99 G co CCGG 62.830 -999.990 N.. V4 2011 08 01 15 11 00 -14.2474 -170.5644 47.00 42.00 5.00 321433 SMO 2011 07 01 02 35 00 2568-99 S co CCGG 53.760 -999.990 ... V4 2011 08 01 14 26 00 -14.2474 -170.5644 60.30 42.00 18.30 321434 SMO 2011 07 01 02 35 00 5203-99 S co CCGG 53.870 -999.990 ... V4 2011 08 01 14 41 00 -14.2474 -170.5644 60.30 42.00 18.30 321435 SMO 2011 07 06 20 35 00 1187-99 S co CCGG 53.380 -999.990 ... V4 2011 08 01 15 27 00 -14.2474 -170.5644 60.30 42.00 18.30 321430 SMO 2011 07 06 20 35 00 626-99 S co CCGG 52.750 -999.990 ... V4 2011 08 01 15 42 00 -14.2474 -170.5644 60.30 42.00 18.30 321431 SMO 2011 07 07 00 03 00 3599-99 G co CCGG 62.120 -999.990 N.. V4 2011 08 01 16 12 00 -14.2474 -170.5644 47.00 42.00 5.00 321429 SMO 2011 07 07 00 03 00 4333-99 G co CCGG 60.450 -999.990 N.. V4 2011 08 01 15 57 00 -14.2474 -170.5644 47.00 42.00 5.00 321428 SMO 2011 07 14 23 35 00 1972-99 S co CCGG 56.630 -999.990 ... V4 2011 08 03 16 29 00 -14.2474 -170.5644 60.30 42.00 18.30 321609 SMO 2011 07 14 23 35 00 2265-99 S co CCGG 55.680 -999.990 ... V4 2011 08 03 16 14 00 -14.2474 -170.5644 60.30 42.00 18.30 321608 SMO 2011 07 15 00 33 00 250-99 G co CCGG 67.470 -999.990 +.. V2 2011 08 03 16 11 00 -14.2474 -170.5644 47.00 42.00 5.00 321610 SMO 2011 07 15 00 33 00 2654-99 G co CCGG 63.410 -999.990 -.. V2 2011 08 03 16 27 00 -14.2474 -170.5644 47.00 42.00 5.00 321611 SMO 2011 07 20 23 36 00 1-99 S co CCGG 56.210 -999.990 ... V2 2011 08 12 12 17 00 -14.2474 -170.5644 60.30 42.00 18.30 321923 SMO 2011 07 20 23 36 00 236-99 S co CCGG 56.340 -999.990 ... V2 2011 08 12 12 33 00 -14.2474 -170.5644 60.30 42.00 18.30 321924 SMO 2011 07 21 00 28 00 349-99 G co CCGG 70.920 -999.990 N.. V2 2011 08 12 11 44 00 -14.2474 -170.5644 47.00 42.00 5.00 321925 SMO 2011 07 21 00 28 00 4211-99 G co CCGG 70.780 -999.990 N.. V2 2011 08 12 12 00 00 -14.2474 -170.5644 47.00 42.00 5.00 321926 SMO 2011 07 27 02 11 00 1469-99 G co CCGG 59.150 -999.990 N.. V2 2011 08 22 11 42 00 -14.2474 -170.5644 47.00 42.00 5.00 322437 SMO 2011 07 27 02 11 00 1517-99 G co CCGG 59.970 -999.990 N.. V2 2011 08 22 11 25 00 -14.2474 -170.5644 47.00 42.00 5.00 322436 SMO 2011 07 27 02 38 00 4223-99 S co CCGG 55.330 -999.990 ... V2 2011 08 22 10 53 00 -14.2474 -170.5644 60.30 42.00 18.30 322438 SMO 2011 07 27 02 38 00 4430-99 S co CCGG 54.250 -999.990 ... V2 2011 08 22 11 09 00 -14.2474 -170.5644 60.30 42.00 18.30 322439 SMO 2011 08 06 21 37 00 2896-99 S co CCGG 55.630 -999.990 ... V2 2011 08 22 12 49 00 -14.2474 -170.5644 60.30 42.00 18.30 322442 SMO 2011 08 06 21 37 00 908-99 S co CCGG 55.600 -999.990 ... V2 2011 08 22 12 33 00 -14.2474 -170.5644 60.30 42.00 18.30 322443 SMO 2011 08 06 22 20 00 2250-99 G co CCGG 64.610 -999.990 N.. V2 2011 08 22 11 58 00 -14.2474 -170.5644 47.00 42.00 5.00 322440 SMO 2011 08 06 22 20 00 4378-99 G co CCGG 62.510 -999.990 N.. V2 2011 08 22 12 14 00 -14.2474 -170.5644 47.00 42.00 5.00 322441 SMO 2011 08 11 23 35 00 1569-99 S co CCGG 54.710 -999.990 ... V2 2011 08 30 13 11 00 -14.2474 -170.5644 60.30 42.00 18.30 322838 SMO 2011 08 11 23 35 00 1630-99 S co CCGG 55.310 -999.990 ... V2 2011 08 30 12 55 00 -14.2474 -170.5644 60.30 42.00 18.30 322839 SMO 2011 08 12 00 40 00 2177-99 G co CCGG 72.730 -999.990 N.. V2 2011 08 30 12 22 00 -14.2474 -170.5644 47.00 42.00 5.00 322836 SMO 2011 08 12 00 40 00 4577-99 G co CCGG 72.050 -999.990 N.. V2 2011 08 30 12 38 00 -14.2474 -170.5644 47.00 42.00 5.00 322837 SMO 2011 08 17 23 36 00 3767-99 S co CCGG 55.070 -999.990 ... V2 2011 09 12 15 29 00 -14.2474 -170.5644 60.30 42.00 18.30 323250 SMO 2011 08 17 23 36 00 460-99 S co CCGG 54.940 -999.990 ... V2 2011 09 12 15 13 00 -14.2474 -170.5644 60.30 42.00 18.30 323249 SMO 2011 08 18 02 00 00 2914-99 G co CCGG 62.110 -999.990 N.. V2 2011 09 12 15 45 00 -14.2474 -170.5644 47.00 42.00 5.00 323252 SMO 2011 08 18 02 00 00 3323-99 G co CCGG 62.640 -999.990 N.. V2 2011 09 12 16 02 00 -14.2474 -170.5644 47.00 42.00 5.00 323251 SMO 2011 08 26 00 37 00 2006-99 S co CCGG 56.470 -999.990 ... V4 2011 09 14 15 54 00 -14.2474 -170.5644 60.30 42.00 18.30 323557 SMO 2011 08 26 00 37 00 4193-99 S co CCGG 56.490 -999.990 ... V4 2011 09 14 15 39 00 -14.2474 -170.5644 60.30 42.00 18.30 323556 SMO 2011 08 26 01 48 00 107-99 G co CCGG 64.820 -999.990 N.. V4 2011 09 14 16 24 00 -14.2474 -170.5644 47.00 42.00 5.00 323530 SMO 2011 08 26 01 48 00 1211-99 G co CCGG 65.380 -999.990 N.. V4 2011 09 14 16 09 00 -14.2474 -170.5644 47.00 42.00 5.00 323531 SMO 2011 08 31 22 37 00 1961-99 S co CCGG 55.890 -999.990 ... V4 2011 09 16 16 06 00 -14.2474 -170.5644 60.30 42.00 18.30 323964 SMO 2011 08 31 22 37 00 4754-99 S co CCGG 55.420 -999.990 ... V4 2011 09 16 16 22 00 -14.2474 -170.5644 60.30 42.00 18.30 323965 SMO 2011 09 01 01 31 00 3197-99 G co CCGG 87.050 -999.990 N.. V4 2011 09 16 15 36 00 -14.2474 -170.5644 47.00 42.00 5.00 323962 SMO 2011 09 01 01 31 00 3607-99 G co CCGG 85.390 -999.990 N.. V4 2011 09 16 15 51 00 -14.2474 -170.5644 47.00 42.00 5.00 323963 SMO 2011 09 07 22 36 00 3145-99 S co CCGG 55.180 -999.990 ... V4 2011 09 28 15 54 00 -14.2474 -170.5644 60.30 42.00 18.30 324211 SMO 2011 09 07 22 36 00 4658-99 S co CCGG 55.020 -999.990 ... V4 2011 09 28 15 38 00 -14.2474 -170.5644 60.30 42.00 18.30 324212 SMO 2011 09 07 23 34 00 4836-99 G co CCGG 64.320 -999.990 N.. V4 2011 09 27 10 49 00 -14.2474 -170.5644 47.00 42.00 5.00 324210 SMO 2011 09 07 23 34 00 6501-66 G co CCGG 63.620 -999.990 N.. V4 2011 09 27 10 34 00 -14.2474 -170.5644 47.00 42.00 5.00 324209 SMO 2011 09 15 00 10 00 1507-99 G co CCGG 66.250 -999.990 N.. V4 2011 10 05 13 07 00 -14.2474 -170.5644 47.00 42.00 5.00 324484 SMO 2011 09 15 00 10 00 2388-99 G co CCGG 64.920 -999.990 N.. V4 2011 10 05 13 23 00 -14.2474 -170.5644 47.00 42.00 5.00 324485 SMO 2011 09 15 02 37 00 2387-99 S co CCGG 55.550 -999.990 ... V4 2011 10 05 13 53 00 -14.2474 -170.5644 60.30 42.00 18.30 324483 SMO 2011 09 15 02 37 00 2435-99 S co CCGG 56.310 -999.990 ... V4 2011 10 05 13 38 00 -14.2474 -170.5644 60.30 42.00 18.30 324482 SMO 2011 09 22 22 37 00 3567-99 S co CCGG 60.000 -999.990 ... V2 2011 10 11 10 45 00 -14.2474 -170.5644 60.30 42.00 18.30 325009 SMO 2011 09 22 22 37 00 6138-66 S co CCGG 60.300 -999.990 ... V2 2011 10 11 11 01 00 -14.2474 -170.5644 60.30 42.00 18.30 325010 SMO 2011 09 23 00 18 00 2075-99 G co CCGG 68.700 -999.990 N.. V2 2011 10 11 10 13 00 -14.2474 -170.5644 47.00 42.00 5.00 325011 SMO 2011 09 23 00 18 00 4200-99 G co CCGG 67.450 -999.990 N.. V2 2011 10 11 10 29 00 -14.2474 -170.5644 47.00 42.00 5.00 325012 SMO 2011 09 30 00 30 00 2465-99 G co CCGG 77.730 -999.990 N.. V2 2011 10 21 10 27 00 -14.2474 -170.5644 47.00 42.00 5.00 325349 SMO 2011 09 30 00 30 00 3597-99 G co CCGG 78.330 -999.990 N.. V2 2011 10 21 10 11 00 -14.2474 -170.5644 47.00 42.00 5.00 325348 SMO 2011 09 30 01 37 00 1808-99 S co CCGG 58.830 -999.990 ... V2 2011 10 21 11 00 00 -14.2474 -170.5644 60.30 42.00 18.30 325351 SMO 2011 09 30 01 37 00 910-99 S co CCGG 58.440 -999.990 ... V2 2011 10 21 10 43 00 -14.2474 -170.5644 60.30 42.00 18.30 325350 SMO 2011 10 08 23 04 00 2265-99 G co CCGG 85.090 -999.990 N.. V2 2011 11 01 15 40 00 -14.2474 -170.5644 47.00 42.00 5.00 325707 SMO 2011 10 08 23 04 00 4618-99 G co CCGG 84.210 -999.990 N.. V2 2011 11 01 15 56 00 -14.2474 -170.5644 47.00 42.00 5.00 325708 SMO 2011 10 08 23 34 00 1000-99 S co CCGG 76.400 -999.990 ... V2 2011 11 01 15 08 00 -14.2474 -170.5644 60.30 42.00 18.30 325705 SMO 2011 10 08 23 34 00 1972-99 S co CCGG 76.710 -999.990 ... V2 2011 11 01 15 24 00 -14.2474 -170.5644 60.30 42.00 18.30 325706 SMO 2011 10 12 23 23 00 2742-99 G co CCGG 80.660 -999.990 N.. V2 2011 11 04 14 54 00 -14.2474 -170.5644 47.00 42.00 5.00 326123 SMO 2011 10 12 23 23 00 4740-99 G co CCGG 81.940 -999.990 N.. V2 2011 11 04 15 11 00 -14.2474 -170.5644 47.00 42.00 5.00 326122 SMO 2011 10 13 04 26 00 1156-99 S co CCGG 74.300 -999.990 ... V2 2011 11 04 14 22 00 -14.2474 -170.5644 60.30 42.00 18.30 326120 SMO 2011 10 13 04 26 00 3465-99 S co CCGG 73.640 -999.990 ... V2 2011 11 04 14 38 00 -14.2474 -170.5644 60.30 42.00 18.30 326121 SMO 2011 10 22 03 40 00 156-99 S co CCGG 89.170 -999.990 N.. V4 2011 11 15 11 39 00 -14.2474 -170.5644 60.30 42.00 18.30 326637 SMO 2011 10 22 03 40 00 1754-99 S co CCGG 129.940 -999.990 N.. V4 2011 11 15 11 54 00 -14.2474 -170.5644 60.30 42.00 18.30 326638 SMO 2011 10 22 04 30 00 4428-99 G co CCGG 65.680 -999.990 N.. V4 2011 11 15 10 37 00 -14.2474 -170.5644 47.00 42.00 5.00 326635 SMO 2011 10 22 04 30 00 4579-99 G co CCGG 65.580 -999.990 N.. V4 2011 11 15 10 52 00 -14.2474 -170.5644 47.00 42.00 5.00 326636 SMO 2011 10 26 22 59 00 1690-99 G co CCGG 78.500 -999.990 N.. V4 2011 11 17 11 48 00 -14.2474 -170.5644 47.00 42.00 5.00 326799 SMO 2011 10 26 22 59 00 4956-99 G co CCGG 78.780 -999.990 N.. V4 2011 11 17 11 33 00 -14.2474 -170.5644 47.00 42.00 5.00 326800 SMO 2011 10 26 23 36 00 6262-66 S co CCGG 67.570 -999.990 ... V4 2011 11 17 12 18 00 -14.2474 -170.5644 60.30 42.00 18.30 326802 SMO 2011 10 26 23 36 00 882-99 S co CCGG 67.040 -999.990 ... V4 2011 11 17 12 03 00 -14.2474 -170.5644 60.30 42.00 18.30 326801 SMO 2011 11 06 02 38 00 4561-99 S co CCGG 62.430 -999.990 ... V4 2011 11 23 12 06 00 -14.2474 -170.5644 60.30 42.00 18.30 327034 SMO 2011 11 06 02 38 00 500-99 S co CCGG 62.290 -999.990 ... V4 2011 11 23 11 51 00 -14.2474 -170.5644 60.30 42.00 18.30 327035 SMO 2011 11 06 03 25 00 2982-99 G co CCGG 63.240 -999.990 N.. V4 2011 11 23 11 20 00 -14.2474 -170.5644 47.00 42.00 5.00 327036 SMO 2011 11 06 03 25 00 4224-99 G co CCGG 63.220 -999.990 N.. V4 2011 11 23 11 35 00 -14.2474 -170.5644 47.00 42.00 5.00 327037 SMO 2011 11 09 00 33 00 1966-99 G co CCGG 78.830 -999.990 N.. V4 2011 11 22 12 10 00 -14.2474 -170.5644 47.00 42.00 5.00 326992 SMO 2011 11 09 00 33 00 4776-99 G co CCGG 76.770 -999.990 N.. V4 2011 11 22 12 26 00 -14.2474 -170.5644 47.00 42.00 5.00 326993 SMO 2011 11 09 01 36 00 1273-99 S co CCGG 66.880 -999.990 ... V4 2011 11 22 12 41 00 -14.2474 -170.5644 60.30 42.00 18.30 326990 SMO 2011 11 09 01 36 00 934-99 S co CCGG 66.850 -999.990 ... V4 2011 11 22 12 56 00 -14.2474 -170.5644 60.30 42.00 18.30 326991 SMO 2011 11 19 03 18 00 4752-99 G co CCGG 61.870 -999.990 N.. V2 2011 12 09 16 39 00 -14.2474 -170.5644 47.00 42.00 5.00 327602 SMO 2011 11 19 03 18 00 5083-99 G co CCGG 62.310 -999.990 N.. V2 2011 12 09 16 55 00 -14.2474 -170.5644 47.00 42.00 5.00 327601 SMO 2011 11 19 04 36 00 4053-99 S co CCGG 58.280 -999.990 ... V4 2011 12 09 16 25 00 -14.2474 -170.5644 60.30 42.00 18.30 327600 SMO 2011 11 19 04 36 00 4293-99 S co CCGG 57.990 -999.990 ... V4 2011 12 09 16 09 00 -14.2474 -170.5644 60.30 42.00 18.30 327599 SMO 2011 11 24 01 37 00 2895-99 S co CCGG 58.460 -999.990 ... V2 2011 12 20 15 47 00 -14.2474 -170.5644 60.30 42.00 18.30 327933 SMO 2011 11 24 01 37 00 3096-99 S co CCGG 58.690 -999.990 ... V2 2011 12 20 15 30 00 -14.2474 -170.5644 60.30 42.00 18.30 327932 SMO 2011 11 24 02 06 00 2464-99 G co CCGG 80.610 -999.990 N.. V2 2011 12 20 16 03 00 -14.2474 -170.5644 47.00 42.00 5.00 327934 SMO 2011 11 24 02 06 00 3087-99 G co CCGG 79.520 -999.990 N.. V2 2011 12 20 16 19 00 -14.2474 -170.5644 47.00 42.00 5.00 327935 SMO 2011 12 08 22 35 00 3582-99 S co CCGG 61.930 -999.990 ... V2 2012 01 06 13 06 00 -14.2474 -170.5644 60.30 42.00 18.30 328807 SMO 2011 12 08 22 35 00 5311-99 S co CCGG 60.340 -999.990 ... V2 2012 01 06 12 50 00 -14.2474 -170.5644 60.30 42.00 18.30 328806 SMO 2011 12 08 23 18 00 1445-99 G co CCGG 76.400 -999.990 N.. V2 2012 01 06 12 17 00 -14.2474 -170.5644 47.00 42.00 5.00 328808 SMO 2011 12 08 23 18 00 4013-99 G co CCGG 76.160 -999.990 N.. V2 2012 01 06 12 34 00 -14.2474 -170.5644 47.00 42.00 5.00 328809 SMO 2011 12 15 23 35 00 1967-99 S co CCGG 58.130 -999.990 ... V2 2012 01 06 13 55 00 -14.2474 -170.5644 60.30 42.00 18.30 328810 SMO 2011 12 15 23 35 00 226-99 S co CCGG 58.780 -999.990 ... V2 2012 01 06 14 11 00 -14.2474 -170.5644 60.30 42.00 18.30 328811 SMO 2011 12 16 00 00 00 2413-99 G co CCGG 70.780 -999.990 N.. V2 2012 01 06 13 22 00 -14.2474 -170.5644 47.00 42.00 5.00 328813 SMO 2011 12 16 00 00 00 6765-66 G co CCGG 68.690 -999.990 N.. V2 2012 01 06 13 39 00 -14.2474 -170.5644 47.00 42.00 5.00 328812 SMO 2011 12 22 01 35 00 4363-99 S co CCGG 53.960 -999.990 ... V2 2012 01 10 09 52 00 -14.2474 -170.5644 60.30 42.00 18.30 328892 SMO 2011 12 22 01 35 00 4742-99 S co CCGG 53.790 -999.990 ... V2 2012 01 10 09 36 00 -14.2474 -170.5644 60.30 42.00 18.30 328891 SMO 2011 12 22 03 46 00 4769-99 G co CCGG 57.230 -999.990 N.. V2 2012 01 10 10 08 00 -14.2474 -170.5644 47.00 42.00 5.00 328893 SMO 2011 12 22 03 46 00 4891-99 G co CCGG 56.790 -999.990 N.. V2 2012 01 10 10 25 00 -14.2474 -170.5644 47.00 42.00 5.00 328894 SMO 2012 01 06 23 37 00 806-99 S co CCGG 64.030 -999.990 ... V2 2012 01 25 13 08 00 -14.2474 -170.5644 60.30 42.00 18.30 330105 SMO 2012 01 06 23 37 00 907-99 S co CCGG 64.720 -999.990 ... V2 2012 01 25 13 24 00 -14.2474 -170.5644 60.30 42.00 18.30 330106 SMO 2012 01 07 00 23 00 3520-99 G co CCGG 70.820 -999.990 N.. V2 2012 01 25 12 35 00 -14.2474 -170.5644 47.00 42.00 5.00 330107 SMO 2012 01 07 00 23 00 671-99 G co CCGG 68.080 -999.990 N.. V2 2012 01 25 12 52 00 -14.2474 -170.5644 47.00 42.00 5.00 330108 SMO 2012 01 13 22 30 00 2324-99 S co CCGG 51.190 -999.990 ... V2 2012 02 06 13 54 00 -14.2474 -170.5644 60.30 42.00 18.30 330673 SMO 2012 01 13 22 30 00 3827-99 S co CCGG 50.770 -999.990 ... V2 2012 02 06 14 10 00 -14.2474 -170.5644 60.30 42.00 18.30 330674 SMO 2012 01 13 22 36 00 2099-99 G co CCGG 63.420 -999.990 N.. V2 2012 02 07 10 46 00 -14.2474 -170.5644 47.00 42.00 5.00 330671 SMO 2012 01 13 22 36 00 4927-99 G co CCGG 63.010 -999.990 N.. V2 2012 02 07 11 02 00 -14.2474 -170.5644 47.00 42.00 5.00 330672 SMO 2012 01 19 22 00 00 3029-99 G co CCGG 65.670 -999.990 N.. V4 2012 02 07 11 38 00 -14.2474 -170.5644 47.00 42.00 5.00 330670 SMO 2012 01 19 22 00 00 4510-99 G co CCGG 65.990 -999.990 N.. V4 2012 02 07 11 23 00 -14.2474 -170.5644 47.00 42.00 5.00 330669 SMO 2012 01 20 00 42 00 3874-99 S co CCGG 62.370 -999.990 ... V4 2012 02 07 11 53 00 -14.2474 -170.5644 60.30 42.00 18.30 330679 SMO 2012 01 20 00 42 00 4571-99 S co CCGG 61.740 -999.990 ... V4 2012 02 07 12 08 00 -14.2474 -170.5644 60.30 42.00 18.30 330680 SMO 2012 01 27 02 58 00 3805-99 G co CCGG 75.590 -999.990 N.. V2 2012 02 13 13 45 00 -14.2474 -170.5644 47.00 42.00 5.00 331140 SMO 2012 01 27 02 58 00 5041-99 G co CCGG 74.950 -999.990 N.. V2 2012 02 13 13 29 00 -14.2474 -170.5644 47.00 42.00 5.00 331141 SMO 2012 01 27 03 29 00 1104-99 S co CCGG 59.530 -999.990 ... V2 2012 02 13 12 56 00 -14.2474 -170.5644 60.30 42.00 18.30 331138 SMO 2012 01 27 03 29 00 3336-99 S co CCGG 59.540 -999.990 ... V2 2012 02 13 13 12 00 -14.2474 -170.5644 60.30 42.00 18.30 331139 SMO 2012 02 02 23 27 00 1452-99 S co CCGG 69.520 -999.990 ... V4 2012 02 22 15 16 00 -14.2474 -170.5644 60.30 42.00 18.30 331791 SMO 2012 02 02 23 27 00 4690-99 S co CCGG 69.680 -999.990 ... V4 2012 02 22 15 01 00 -14.2474 -170.5644 60.30 42.00 18.30 331790 SMO 2012 02 03 00 32 00 4236-99 G co CCGG 85.230 -999.990 N.. V4 2012 02 22 16 17 00 -14.2474 -170.5644 47.00 42.00 5.00 331793 SMO 2012 02 03 00 32 00 4508-99 G co CCGG 85.700 -999.990 N.. V4 2012 02 22 16 02 00 -14.2474 -170.5644 47.00 42.00 5.00 331792 SMO 2012 02 08 23 35 00 3174-99 S co CCGG 68.170 -999.990 ... V4 2012 03 06 15 44 00 -14.2474 -170.5644 60.30 42.00 18.30 332092 SMO 2012 02 08 23 35 00 979-99 S co CCGG 68.890 -999.990 ... V4 2012 03 06 15 28 00 -14.2474 -170.5644 60.30 42.00 18.30 332091 SMO 2012 02 08 23 41 00 1241-99 G co CCGG 78.230 -999.990 N.. V4 2012 03 06 14 58 00 -14.2474 -170.5644 47.00 42.00 5.00 332093 SMO 2012 02 08 23 41 00 999-99 G co CCGG 79.030 -999.990 N.. V4 2012 03 06 15 13 00 -14.2474 -170.5644 47.00 42.00 5.00 332094 SMO 2012 02 16 22 36 00 2439-99 S co CCGG 60.730 -999.990 ... V4 2012 03 12 16 02 00 -14.2474 -170.5644 60.30 42.00 18.30 332419 SMO 2012 02 16 22 36 00 4110-99 S co CCGG 60.340 -999.990 ... V4 2012 03 12 16 18 00 -14.2474 -170.5644 60.30 42.00 18.30 332420 SMO 2012 02 16 23 46 00 1799-99 G co CCGG 72.760 -999.990 N.. V4 2012 03 12 15 32 00 -14.2474 -170.5644 47.00 42.00 5.00 332421 SMO 2012 02 16 23 46 00 581-99 G co CCGG 71.260 -999.990 N.. V4 2012 03 12 15 47 00 -14.2474 -170.5644 47.00 42.00 5.00 332422 SMO 2012 02 22 22 35 00 1728-99 S co CCGG 58.070 -999.990 ... V4 2012 03 16 13 17 00 -14.2474 -170.5644 60.30 42.00 18.30 332713 SMO 2012 02 22 22 35 00 5422-99 S co CCGG 57.700 -999.990 ... V4 2012 03 16 13 02 00 -14.2474 -170.5644 60.30 42.00 18.30 332712 SMO 2012 02 23 00 49 00 1634-99 G co CCGG 63.810 -999.990 N.. V4 2012 03 16 13 48 00 -14.2474 -170.5644 47.00 42.00 5.00 332715 SMO 2012 02 23 00 49 00 4396-99 G co CCGG 63.920 -999.990 N.. V4 2012 03 16 13 32 00 -14.2474 -170.5644 47.00 42.00 5.00 332714 SMO 2012 03 01 22 27 00 1748-99 S co CCGG 54.840 -999.990 ... V4 2012 03 27 14 04 00 -14.2474 -170.5644 60.30 42.00 18.30 333191 SMO 2012 03 01 22 27 00 4975-99 S co CCGG 54.480 -999.990 ... V4 2012 03 27 14 20 00 -14.2474 -170.5644 60.30 42.00 18.30 333192 SMO 2012 03 02 00 00 00 1148-99 G co CCGG 63.500 -999.990 N.. V4 2012 03 27 14 35 00 -14.2474 -170.5644 47.00 42.00 5.00 333193 SMO 2012 03 02 00 00 00 5323-99 G co CCGG 61.760 -999.990 N.. V4 2012 03 27 14 50 00 -14.2474 -170.5644 47.00 42.00 5.00 333194 SMO 2012 03 08 01 32 00 1061-99 S co CCGG 50.350 -999.990 ... V4 2012 03 21 14 41 00 -14.2474 -170.5644 60.30 42.00 18.30 332862 SMO 2012 03 08 01 32 00 1101-99 S co CCGG 50.100 -999.990 ... V4 2012 03 21 14 57 00 -14.2474 -170.5644 60.30 42.00 18.30 332863 SMO 2012 03 08 02 41 00 3155-99 G co CCGG 57.570 -999.990 N.. V4 2012 03 22 10 19 00 -14.2474 -170.5644 47.00 42.00 5.00 332865 SMO 2012 03 08 02 41 00 4565-99 G co CCGG 57.840 -999.990 N.. V4 2012 03 22 10 04 00 -14.2474 -170.5644 47.00 42.00 5.00 332864 SMO 2012 03 16 00 15 00 1961-99 G co CCGG 68.900 -999.990 N.. V4 2012 04 17 14 53 00 -14.2474 -170.5644 47.00 42.00 5.00 333908 SMO 2012 03 16 00 15 00 2903-99 G co CCGG 69.240 -999.990 N.. V4 2012 04 17 15 08 00 -14.2474 -170.5644 47.00 42.00 5.00 333909 SMO 2012 03 16 00 41 00 1354-99 S co CCGG 58.450 -999.990 ... V4 2012 04 11 12 36 00 -14.2474 -170.5644 60.30 42.00 18.30 333906 SMO 2012 03 16 00 41 00 2503-99 S co CCGG 56.490 -999.990 ... V4 2012 04 11 12 51 00 -14.2474 -170.5644 60.30 42.00 18.30 333907 SMO 2012 03 22 22 38 00 154-99 S co CCGG 62.300 -999.990 ... V4 2012 04 17 14 38 00 -14.2474 -170.5644 60.30 42.00 18.30 333979 SMO 2012 03 22 22 38 00 4247-99 S co CCGG 61.860 -999.990 ... V4 2012 04 17 14 22 00 -14.2474 -170.5644 60.30 42.00 18.30 333978 SMO 2012 03 22 23 50 00 6035-66 G co CCGG 71.180 -999.990 N.. V4 2012 04 17 13 52 00 -14.2474 -170.5644 47.00 42.00 5.00 333980 SMO 2012 03 22 23 50 00 6339-66 G co CCGG 70.750 -999.990 N.. V4 2012 04 17 14 07 00 -14.2474 -170.5644 47.00 42.00 5.00 333981 SMO 2012 03 28 22 36 00 1936-99 S co CCGG 68.180 -999.990 .X. V2 2012 05 08 15 09 00 -14.2474 -170.5644 60.30 42.00 18.30 334904 SMO 2012 03 28 22 36 00 2622-99 S co CCGG 68.430 -999.990 .X. V2 2012 05 08 15 25 00 -14.2474 -170.5644 60.30 42.00 18.30 334905 SMO 2012 03 31 00 31 00 3489-99 G co CCGG 68.240 -999.990 N.. V4 2012 04 20 14 07 00 -14.2474 -170.5644 47.00 42.00 5.00 334189 SMO 2012 03 31 00 31 00 4726-99 G co CCGG 68.090 -999.990 N.. V4 2012 04 20 14 22 00 -14.2474 -170.5644 47.00 42.00 5.00 334190 SMO 2012 04 04 00 39 00 2126-99 S co CCGG 52.850 -999.990 ... V2 2012 05 23 14 11 00 -14.2474 -170.5644 60.30 42.00 18.30 335773 SMO 2012 04 04 00 39 00 3725-99 S co CCGG 52.770 -999.990 ... V2 2012 05 23 13 54 00 -14.2474 -170.5644 60.30 42.00 18.30 335772 SMO 2012 04 04 01 29 00 312-99 G co CCGG 63.760 -999.990 N.. V2 2012 05 23 14 27 00 -14.2474 -170.5644 47.00 42.00 5.00 335774 SMO 2012 04 04 01 29 00 3563-99 G co CCGG 61.710 -999.990 N.. V2 2012 05 23 14 43 00 -14.2474 -170.5644 47.00 42.00 5.00 335775 SMO 2012 04 06 01 35 00 2845-99 S co CCGG 50.770 -999.990 ... V4 2012 04 27 14 51 00 -14.2474 -170.5644 60.30 42.00 18.30 334411 SMO 2012 04 06 01 35 00 6162-66 S co CCGG 50.130 -999.990 ... V4 2012 04 27 14 36 00 -14.2474 -170.5644 60.30 42.00 18.30 334410 SMO 2012 04 06 14 11 00 2674-99 G co CCGG 60.640 -999.990 N.. V4 2012 04 30 15 21 00 -14.2474 -170.5644 47.00 42.00 5.00 334413 SMO 2012 04 06 14 11 00 6422-66 G co CCGG 60.770 -999.990 N.. V4 2012 04 30 15 06 00 -14.2474 -170.5644 47.00 42.00 5.00 334412 SMO 2012 04 12 22 35 00 4875-99 S co CCGG 49.370 -999.990 ... V4 2012 05 08 15 51 00 -14.2474 -170.5644 60.30 42.00 18.30 334781 SMO 2012 04 12 22 35 00 5198-99 S co CCGG 48.900 -999.990 ... V4 2012 05 08 16 06 00 -14.2474 -170.5644 60.30 42.00 18.30 334782 SMO 2012 04 12 23 30 00 4592-99 G co CCGG 56.600 -999.990 N.. V4 2012 05 08 15 36 00 -14.2474 -170.5644 47.00 42.00 5.00 334784 SMO 2012 04 12 23 30 00 4656-99 G co CCGG 57.990 -999.990 N.. V4 2012 05 08 15 20 00 -14.2474 -170.5644 47.00 42.00 5.00 334783 SMO 2012 04 19 01 35 00 3597-99 S co CCGG 51.550 -999.990 ... V4 2012 05 08 14 50 00 -14.2474 -170.5644 60.30 42.00 18.30 334777 SMO 2012 04 19 01 35 00 4428-99 S co CCGG 51.580 -999.990 ... V4 2012 05 08 15 05 00 -14.2474 -170.5644 60.30 42.00 18.30 334778 SMO 2012 04 19 02 27 00 2465-99 G co CCGG 66.190 -999.990 N.. V4 2012 05 09 10 47 00 -14.2474 -170.5644 47.00 42.00 5.00 334780 SMO 2012 04 19 02 27 00 4579-99 G co CCGG 63.500 -999.990 N.. V4 2012 05 09 11 02 00 -14.2474 -170.5644 47.00 42.00 5.00 334779 SMO 2012 04 26 00 36 00 2498-99 S co CCGG 51.050 -999.990 ... V4 2012 05 14 13 51 00 -14.2474 -170.5644 60.30 42.00 18.30 335089 SMO 2012 04 26 00 36 00 4375-99 S co CCGG 50.390 -999.990 ... V4 2012 05 14 13 35 00 -14.2474 -170.5644 60.30 42.00 18.30 335088 SMO 2012 04 26 01 38 00 1015-99 G co CCGG 60.770 -999.990 N.. V4 2012 05 14 13 05 00 -14.2474 -170.5644 47.00 42.00 5.00 335090 SMO 2012 04 26 01 38 00 1471-99 G co CCGG 62.000 -999.990 N.. V4 2012 05 14 13 20 00 -14.2474 -170.5644 47.00 42.00 5.00 335091 SMO 2012 05 11 00 45 00 1755-99 G co CCGG 74.940 -999.990 N.. V4 2012 06 20 11 24 00 -14.2474 -170.5644 47.00 42.00 5.00 337156 SMO 2012 05 11 00 45 00 5277-99 G co CCGG 72.720 -999.990 N.. V4 2012 06 20 11 39 00 -14.2474 -170.5644 47.00 42.00 5.00 337155 SMO 2012 05 11 01 35 00 2991-99 S co CCGG 52.670 -999.990 ... V4 2012 06 20 10 53 00 -14.2474 -170.5644 60.30 42.00 18.30 337157 SMO 2012 05 11 01 35 00 478-99 S co CCGG 55.120 -999.990 ... V4 2012 06 20 11 08 00 -14.2474 -170.5644 60.30 42.00 18.30 337158 SMO 2012 05 17 23 35 00 1727-99 S co CCGG 52.090 -999.990 ... V4 2012 06 19 15 41 00 -14.2474 -170.5644 60.30 42.00 18.30 337153 SMO 2012 05 17 23 35 00 2396-99 S co CCGG 52.040 -999.990 ... V4 2012 06 19 15 56 00 -14.2474 -170.5644 60.30 42.00 18.30 337154 SMO 2012 05 18 00 25 00 4761-99 G co CCGG 59.110 -999.990 N.. V4 2012 06 20 10 22 00 -14.2474 -170.5644 47.00 42.00 5.00 337151 SMO 2012 05 18 00 25 00 647-99 G co CCGG 61.290 -999.990 N.. V4 2012 06 20 10 38 00 -14.2474 -170.5644 47.00 42.00 5.00 337152 SMO 2012 06 03 03 35 00 2613-99 S co CCGG 53.810 -999.990 ... V4 2012 06 20 13 15 00 -14.2474 -170.5644 60.30 42.00 18.30 337228 SMO 2012 06 03 03 35 00 3984-99 S co CCGG 53.460 -999.990 ... V4 2012 06 20 12 59 00 -14.2474 -170.5644 60.30 42.00 18.30 337227 SMO 2012 06 03 05 02 00 3084-99 G co CCGG 53.060 -999.990 N.. V4 2012 06 20 13 45 00 -14.2474 -170.5644 47.00 42.00 5.00 337226 SMO 2012 06 03 05 02 00 4789-99 G co CCGG 53.560 -999.990 N.. V4 2012 06 20 13 30 00 -14.2474 -170.5644 47.00 42.00 5.00 337225 SMO 2012 06 07 23 40 00 3455-99 S co CCGG 56.830 -999.990 ... V4 2012 06 20 14 16 00 -14.2474 -170.5644 60.30 42.00 18.30 337224 SMO 2012 06 07 23 40 00 6047-66 S co CCGG 56.390 -999.990 ... V4 2012 06 20 14 00 00 -14.2474 -170.5644 60.30 42.00 18.30 337223 SMO 2012 06 08 00 11 00 1925-99 G co CCGG 67.020 -999.990 N.. V4 2012 06 20 14 46 00 -14.2474 -170.5644 47.00 42.00 5.00 337222 SMO 2012 06 08 00 11 00 4950-99 G co CCGG 67.320 -999.990 N.. V4 2012 06 20 14 31 00 -14.2474 -170.5644 47.00 42.00 5.00 337221 SMO 2012 06 15 20 40 00 2030-99 S co CCGG 56.050 -999.990 ... V4 2012 07 10 09 37 00 -14.2474 -170.5644 60.30 42.00 18.30 337788 SMO 2012 06 15 20 40 00 4411-99 S co CCGG 55.490 -999.990 ... V4 2012 07 10 09 52 00 -14.2474 -170.5644 60.30 42.00 18.30 337789 SMO 2012 06 15 21 48 00 5396-99 G co CCGG 64.750 -999.990 N.. V4 2012 07 17 11 59 00 -14.2474 -170.5644 47.00 42.00 5.00 337785 SMO 2012 06 20 22 35 00 3221-99 S co CCGG 55.000 -999.990 ... V4 2012 07 10 08 36 00 -14.2474 -170.5644 60.30 42.00 18.30 337786 SMO 2012 06 20 22 35 00 4324-99 S co CCGG 54.310 -999.990 ... V4 2012 07 10 08 51 00 -14.2474 -170.5644 60.30 42.00 18.30 337787 SMO 2012 06 20 23 10 00 1672-99 G co CCGG 65.110 -999.990 N.. V4 2012 07 10 09 22 00 -14.2474 -170.5644 47.00 42.00 5.00 337784 SMO 2012 06 20 23 10 00 4082-99 G co CCGG 65.310 -999.990 N.. V4 2012 07 10 09 07 00 -14.2474 -170.5644 47.00 42.00 5.00 337783 SMO 2012 06 27 23 35 00 1389-99 S co CCGG 59.640 -999.990 ... V4 2012 07 24 11 59 00 -14.2474 -170.5644 60.30 42.00 18.30 338394 SMO 2012 06 27 23 35 00 1880-99 S co CCGG 59.630 -999.990 ... V4 2012 07 24 12 14 00 -14.2474 -170.5644 60.30 42.00 18.30 338395 SMO 2012 06 28 00 50 00 2249-99 G co CCGG 80.700 -999.990 -.. V4 2012 07 24 11 43 00 -14.2474 -170.5644 47.00 42.00 5.00 338396 SMO 2012 06 28 00 50 00 6393-66 G co CCGG 89.650 -999.990 +.. V4 2012 07 24 11 28 00 -14.2474 -170.5644 47.00 42.00 5.00 338397 SMO 2012 07 05 00 35 00 1276-99 S co CCGG 56.490 -999.990 ... V4 2012 08 02 15 03 00 -14.2474 -170.5644 60.30 42.00 18.30 338816 SMO 2012 07 05 00 35 00 4363-99 S co CCGG 55.970 -999.990 ... V4 2012 08 02 14 48 00 -14.2474 -170.5644 60.30 42.00 18.30 338815 SMO 2012 07 05 02 40 00 2130-99 G co CCGG 63.200 -999.990 N.. V4 2012 08 02 14 33 00 -14.2474 -170.5644 47.00 42.00 5.00 338818 SMO 2012 07 05 02 40 00 424-99 G co CCGG 65.430 -999.990 N.. V4 2012 08 02 14 18 00 -14.2474 -170.5644 47.00 42.00 5.00 338817 SMO 2012 07 11 23 35 00 3169-99 S co CCGG 56.490 -999.990 ... V4 2012 08 22 13 41 00 -14.2474 -170.5644 60.30 42.00 18.30 339409 SMO 2012 07 11 23 35 00 4590-99 S co CCGG 56.580 -999.990 ... V4 2012 08 22 13 57 00 -14.2474 -170.5644 60.30 42.00 18.30 339410 SMO 2012 07 13 00 45 00 4046-99 G co CCGG 64.190 -999.990 N.. V4 2012 08 23 14 53 00 -14.2474 -170.5644 47.00 42.00 5.00 339406 SMO 2012 07 13 02 10 00 4000-99 G co CCGG 62.360 -999.990 N.. V4 2012 08 17 13 40 00 -14.2474 -170.5644 47.00 42.00 5.00 339407 SMO 2012 07 13 02 10 00 4742-99 G co CCGG 62.700 -999.990 N.. V4 2012 08 17 13 55 00 -14.2474 -170.5644 47.00 42.00 5.00 339408 SMO 2012 07 26 23 25 00 2721-99 S co CCGG 57.430 -999.990 ... V4 2012 08 29 14 39 00 -14.2474 -170.5644 60.30 42.00 18.30 339954 SMO 2012 07 26 23 25 00 5176-99 S co CCGG 54.250 -999.990 ... V4 2012 08 29 14 24 00 -14.2474 -170.5644 60.30 42.00 18.30 339953 SMO 2012 07 27 00 18 00 3408-99 G co CCGG 71.060 -999.990 N.. V4 2012 08 29 13 53 00 -14.2474 -170.5644 47.00 42.00 5.00 339955 SMO 2012 07 27 00 18 00 3514-99 G co CCGG 69.380 -999.990 N.. V4 2012 08 29 14 09 00 -14.2474 -170.5644 47.00 42.00 5.00 339956 SMO 2012 08 09 00 19 00 2784-99 G co CCGG 71.120 -999.990 N.. V4 2012 09 05 14 47 00 -14.2474 -170.5644 47.00 42.00 5.00 340333 SMO 2012 08 09 00 19 00 4548-99 G co CCGG 70.600 -999.990 N.. V4 2012 09 05 15 02 00 -14.2474 -170.5644 47.00 42.00 5.00 340334 SMO 2012 08 09 02 25 00 5072-99 S co CCGG 54.720 -999.990 ... V4 2012 09 06 12 40 00 -14.2474 -170.5644 60.30 42.00 18.30 340335 SMO 2012 08 18 05 08 00 2037-99 G co CCGG 56.990 -999.990 N.. V4 2012 09 18 16 37 00 -14.2474 -170.5644 47.00 42.00 5.00 341001 SMO 2012 08 18 05 08 00 2073-99 G co CCGG 57.210 -999.990 N.. V4 2012 09 18 16 52 00 -14.2474 -170.5644 47.00 42.00 5.00 341002 SMO 2012 08 22 23 35 00 2369-99 S co CCGG 62.610 -999.990 ... V4 2012 09 19 09 14 00 -14.2474 -170.5644 60.30 42.00 18.30 341003 SMO 2012 08 22 23 35 00 701-99 S co CCGG 63.870 -999.990 ... V4 2012 09 19 09 30 00 -14.2474 -170.5644 60.30 42.00 18.30 341004 SMO 2012 08 24 23 35 00 2116-99 S co CCGG 59.680 -999.990 ... V4 2012 09 18 10 46 00 -14.2474 -170.5644 60.30 42.00 18.30 340984 SMO 2012 08 24 23 35 00 4367-99 S co CCGG 60.300 -999.990 ... V4 2012 09 18 10 30 00 -14.2474 -170.5644 60.30 42.00 18.30 340983 SMO 2012 08 25 00 13 00 140-99 G co CCGG 71.020 -999.990 N.. V4 2012 09 17 11 35 00 -14.2474 -170.5644 47.00 42.00 5.00 340981 SMO 2012 08 25 00 13 00 3668-99 G co CCGG 70.150 -999.990 N.. V4 2012 09 17 11 50 00 -14.2474 -170.5644 47.00 42.00 5.00 340982 SMO 2012 08 30 01 05 00 2174-99 G co CCGG 68.560 -999.990 N.. V4 2012 09 26 15 40 00 -14.2474 -170.5644 47.00 42.00 5.00 341373 SMO 2012 08 30 01 05 00 2939-99 G co CCGG 67.660 -999.990 N.. V4 2012 09 26 15 25 00 -14.2474 -170.5644 47.00 42.00 5.00 341372 SMO 2012 08 30 02 35 00 1473-99 S co CCGG 56.980 -999.990 ... V4 2012 09 26 15 09 00 -14.2474 -170.5644 60.30 42.00 18.30 341375 SMO 2012 08 30 02 35 00 3190-99 S co CCGG 57.790 -999.990 ... V4 2012 09 26 14 54 00 -14.2474 -170.5644 60.30 42.00 18.30 341374 SMO 2012 09 07 22 31 00 2556-99 G co CCGG 85.830 -999.990 N.. V4 2012 10 03 10 27 00 -14.2474 -170.5644 47.00 42.00 5.00 341679 SMO 2012 09 07 22 31 00 4010-99 G co CCGG 84.520 -999.990 N.. V4 2012 10 03 10 12 00 -14.2474 -170.5644 47.00 42.00 5.00 341678 SMO 2012 09 07 23 35 00 4430-99 S co CCGG 57.160 -999.990 ... V4 2012 10 03 10 43 00 -14.2474 -170.5644 60.30 42.00 18.30 341676 SMO 2012 09 07 23 35 00 4474-99 S co CCGG 59.090 -999.990 ... V4 2012 10 03 10 58 00 -14.2474 -170.5644 60.30 42.00 18.30 341677 SMO 2012 09 20 02 01 00 1238-99 G co CCGG 66.050 -999.990 N.. V4 2012 10 26 11 02 00 -14.2474 -170.5644 47.00 42.00 5.00 342758 SMO 2012 09 20 02 01 00 65-99 G co CCGG 65.240 -999.990 N.. V4 2012 10 26 11 17 00 -14.2474 -170.5644 47.00 42.00 5.00 342759 SMO 2012 09 20 02 36 00 311-99 S co CCGG 59.550 -999.990 ... V4 2012 10 26 11 32 00 -14.2474 -170.5644 60.30 42.00 18.30 342756 SMO 2012 09 20 02 36 00 4373-99 S co CCGG 58.150 -999.990 ... V4 2012 10 26 11 48 00 -14.2474 -170.5644 60.30 42.00 18.30 342757 SMO 2012 10 08 01 35 00 3448-99 S co CCGG 65.710 -999.990 ... V4 2012 11 27 15 08 00 -14.2474 -170.5644 60.30 42.00 18.30 344082 SMO 2012 10 08 01 35 00 4691-99 S co CCGG 64.270 -999.990 ... V4 2012 11 27 14 53 00 -14.2474 -170.5644 60.30 42.00 18.30 344083 SMO 2012 10 08 02 15 00 224-99 G co CCGG 72.680 -999.990 N.. V4 2012 11 27 14 23 00 -14.2474 -170.5644 60.30 42.00 18.30 344078 SMO 2012 10 08 02 15 00 5324-99 G co CCGG 73.410 -999.990 N.. V4 2012 11 27 14 38 00 -14.2474 -170.5644 60.30 42.00 18.30 344079 SMO 2012 10 11 02 29 00 1507-99 G co CCGG 75.150 -999.990 N.. V4 2012 10 18 14 18 00 -14.2474 -170.5644 47.00 42.00 5.00 342907 SMO 2012 10 11 02 29 00 170-99 G co CCGG 74.820 -999.990 N.. V4 2012 10 18 14 03 00 -14.2474 -170.5644 47.00 42.00 5.00 342906 SMO 2012 10 11 03 25 00 515-99 S co CCGG 71.660 -999.990 ... V4 2012 10 18 14 33 00 -14.2474 -170.5644 60.30 42.00 18.30 342904 SMO 2012 10 11 03 25 00 832-99 S co CCGG 71.000 -999.990 ... V4 2012 10 18 14 49 00 -14.2474 -170.5644 60.30 42.00 18.30 342905 SMO 2012 10 18 01 37 00 3037-99 S co CCGG 66.010 -999.990 ... V4 2012 11 07 10 43 00 -14.2474 -170.5644 60.30 42.00 18.30 343244 SMO 2012 10 18 01 37 00 3550-99 S co CCGG 66.420 -999.990 ... V4 2012 11 07 10 28 00 -14.2474 -170.5644 60.30 42.00 18.30 343243 SMO 2012 10 18 01 46 00 2095-99 G co CCGG 77.270 -999.990 N.. V4 2012 11 07 10 12 00 -14.2474 -170.5644 47.00 42.00 5.00 343246 SMO 2012 10 18 01 46 00 3713-99 G co CCGG 76.900 -999.990 N.. V4 2012 11 07 09 57 00 -14.2474 -170.5644 47.00 42.00 5.00 343245 SMO 2012 10 25 00 37 00 1778-99 S co CCGG 67.980 -999.990 ... V4 2012 11 15 13 01 00 -14.2474 -170.5644 60.30 42.00 18.30 343516 SMO 2012 10 25 00 37 00 4686-99 S co CCGG 67.370 -999.990 ... V4 2012 11 15 13 17 00 -14.2474 -170.5644 60.30 42.00 18.30 343517 SMO 2012 10 25 00 52 00 3433-99 G co CCGG 79.310 -999.990 N.. V4 2012 11 13 13 45 00 -14.2474 -170.5644 47.00 42.00 5.00 343514 SMO 2012 10 25 00 52 00 4519-99 G co CCGG 78.440 -999.990 N.. V4 2012 11 13 14 00 00 -14.2474 -170.5644 47.00 42.00 5.00 343515 SMO 2012 10 31 22 07 00 2492-99 G co CCGG 73.040 -999.990 N.. V4 2012 11 15 10 44 00 -14.2474 -170.5644 47.00 42.00 5.00 343781 SMO 2012 10 31 22 07 00 825-99 G co CCGG 72.050 -999.990 N.. V4 2012 11 15 10 29 00 -14.2474 -170.5644 47.00 42.00 5.00 343780 SMO 2012 10 31 22 41 00 2559-99 S co CCGG 64.050 -999.990 ... V4 2012 11 15 09 57 00 -14.2474 -170.5644 60.30 42.00 18.30 343782 SMO 2012 10 31 22 41 00 2860-99 S co CCGG 64.340 -999.990 ... V4 2012 11 15 10 13 00 -14.2474 -170.5644 60.30 42.00 18.30 343783 SMO 2012 11 14 20 35 00 1002-99 S co CCGG 64.860 -999.990 ... V4 2012 12 04 12 03 00 -14.2474 -170.5644 60.30 42.00 18.30 344406 SMO 2012 11 14 20 35 00 5100-99 S co CCGG 64.420 -999.990 ... V4 2012 12 04 12 18 00 -14.2474 -170.5644 60.30 42.00 18.30 344407 SMO 2012 11 14 20 59 00 4173-99 G co CCGG 74.610 -999.990 N.. V4 2012 12 04 12 33 00 -14.2474 -170.5644 47.00 42.00 5.00 344404 SMO 2012 11 14 20 59 00 939-99 G co CCGG 74.610 -999.990 N.. V4 2012 12 04 12 48 00 -14.2474 -170.5644 47.00 42.00 5.00 344405 SMO 2012 11 24 21 44 00 2535-99 S co CCGG 63.190 -999.990 ... V2 2012 12 18 10 34 00 -14.2474 -170.5644 60.30 42.00 18.30 344931 SMO 2012 11 24 21 44 00 4128-99 S co CCGG 61.520 -999.990 ... V2 2012 12 18 10 50 00 -14.2474 -170.5644 60.30 42.00 18.30 344932 SMO 2012 11 24 21 56 00 1306-99 G co CCGG 72.430 -999.990 N.. V2 2012 12 18 11 55 00 -14.2474 -170.5644 47.00 42.00 5.00 344929 SMO 2012 11 24 21 56 00 2302-99 G co CCGG 70.210 -999.990 N.. V2 2012 12 18 11 39 00 -14.2474 -170.5644 47.00 42.00 5.00 344930 SMO 2012 11 29 00 37 00 2960-99 S co CCGG 61.300 -999.990 ... V2 2012 12 18 11 06 00 -14.2474 -170.5644 60.30 42.00 18.30 344927 SMO 2012 11 29 00 37 00 4101-99 S co CCGG 60.040 -999.990 ... V2 2012 12 18 11 23 00 -14.2474 -170.5644 60.30 42.00 18.30 344928 SMO 2012 11 29 00 51 00 3651-99 G co CCGG 69.820 -999.990 N.. V2 2012 12 18 12 27 00 -14.2474 -170.5644 47.00 42.00 5.00 344926 SMO 2012 11 29 00 51 00 4958-99 G co CCGG 70.310 -999.990 N.. V2 2012 12 18 12 11 00 -14.2474 -170.5644 47.00 42.00 5.00 344925 SMO 2012 12 03 03 16 00 1920-99 G co CCGG 62.620 -999.990 N.. V2 2012 12 28 12 31 00 -14.2474 -170.5644 47.00 42.00 5.00 345087 SMO 2012 12 03 03 16 00 3162-99 G co CCGG 62.100 -999.990 N.. V2 2012 12 28 12 15 00 -14.2474 -170.5644 47.00 42.00 5.00 345086 SMO 2012 12 03 03 36 00 1711-99 S co CCGG 58.700 -999.990 ... V2 2012 12 28 13 53 00 -14.2474 -170.5644 60.30 42.00 18.30 345088 SMO 2012 12 03 03 36 00 6605-66 S co CCGG 60.470 -999.990 ... V2 2012 12 28 14 09 00 -14.2474 -170.5644 60.30 42.00 18.30 345089 SMO 2012 12 19 02 04 00 1131-99 G co CCGG 58.880 -999.990 N.. V4 2013 01 15 14 50 00 -14.2474 -170.5644 47.00 42.00 5.00 345880 SMO 2012 12 19 02 04 00 5322-99 G co CCGG 59.300 -999.990 N.. V4 2013 01 15 15 05 00 -14.2474 -170.5644 47.00 42.00 5.00 345881 SMO 2012 12 19 02 38 00 499-99 S co CCGG 56.080 -999.990 ... V4 2013 01 15 14 35 00 -14.2474 -170.5644 60.30 42.00 18.30 345882 SMO 2012 12 19 02 38 00 6375-66 S co CCGG 52.740 -999.990 ... V4 2013 01 15 14 19 00 -14.2474 -170.5644 60.30 42.00 18.30 345883 SMO 2012 12 27 00 38 00 3038-99 S co CCGG 53.990 -999.990 ... V4 2013 01 17 13 26 00 -14.2474 -170.5644 60.30 42.00 18.30 346103 SMO 2012 12 27 00 38 00 4606-99 S co CCGG 53.540 -999.990 ... V4 2013 01 17 13 11 00 -14.2474 -170.5644 60.30 42.00 18.30 346104 SMO 2012 12 27 01 02 00 2370-99 G co CCGG 72.140 -999.990 N.. V4 2013 01 17 13 41 00 -14.2474 -170.5644 47.00 42.00 5.00 346101 SMO 2012 12 27 01 02 00 2623-99 G co CCGG 70.960 -999.990 N.. V4 2013 01 17 13 57 00 -14.2474 -170.5644 47.00 42.00 5.00 346102 SMO 2013 01 02 22 00 00 2943-99 G co CCGG 68.540 -999.990 N.. V2 2013 01 23 12 54 00 -14.2474 -170.5644 47.00 42.00 5.00 346432 SMO 2013 01 02 22 00 00 35-99 G co CCGG 69.700 -999.990 N.. V2 2013 01 23 13 11 00 -14.2474 -170.5644 47.00 42.00 5.00 346433 SMO 2013 01 02 22 44 00 3415-99 S co CCGG 62.060 -999.990 ... V2 2013 01 23 12 22 00 -14.2474 -170.5644 60.30 42.00 18.30 346430 SMO 2013 01 02 22 44 00 4409-99 S co CCGG 61.530 -999.990 ... V2 2013 01 23 12 38 00 -14.2474 -170.5644 60.30 42.00 18.30 346431 SMO 2013 01 12 21 38 00 2257-99 S co CCGG 67.720 -999.990 ... V2 2013 01 29 16 36 00 -14.2474 -170.5644 60.30 42.00 18.30 346839 SMO 2013 01 12 21 38 00 4071-99 S co CCGG 67.950 -999.990 ... V2 2013 01 29 16 53 00 -14.2474 -170.5644 60.30 42.00 18.30 346840 SMO 2013 01 12 21 57 00 1450-99 G co CCGG 76.130 -999.990 N.. V2 2013 01 29 16 04 00 -14.2474 -170.5644 47.00 42.00 5.00 346837 SMO 2013 01 12 21 57 00 3560-99 G co CCGG 75.400 -999.990 N.. V2 2013 01 29 16 20 00 -14.2474 -170.5644 47.00 42.00 5.00 346838 SMO 2013 01 22 22 36 00 3091-99 S co CCGG 57.360 -999.990 ... V2 2013 02 13 15 10 00 -14.2474 -170.5644 60.30 42.00 18.30 347542 SMO 2013 01 22 22 36 00 838-99 S co CCGG 58.210 -999.990 ... V2 2013 02 13 14 53 00 -14.2474 -170.5644 60.30 42.00 18.30 347543 SMO 2013 01 22 22 55 00 2964-99 G co CCGG 65.470 -999.990 N.. V2 2013 02 13 15 42 00 -14.2474 -170.5644 47.00 42.00 5.00 347541 SMO 2013 01 22 22 55 00 4230-99 G co CCGG 63.270 -999.990 N.. V2 2013 02 13 15 26 00 -14.2474 -170.5644 47.00 42.00 5.00 347540 SMO 2013 01 30 22 35 00 1421-99 S co CCGG 76.620 -999.990 .X. V2 2013 02 27 15 07 00 -14.2474 -170.5644 60.30 42.00 18.30 348010 SMO 2013 01 30 22 35 00 1747-99 S co CCGG 78.460 -999.990 .X. V2 2013 02 27 14 51 00 -14.2474 -170.5644 60.30 42.00 18.30 348009 SMO 2013 01 30 22 48 00 1997-99 G co CCGG 82.650 -999.990 N.. V2 2013 02 26 11 57 00 -14.2474 -170.5644 47.00 42.00 5.00 348008 SMO 2013 01 30 22 48 00 3006-99 G co CCGG 82.800 -999.990 N.. V2 2013 02 26 11 41 00 -14.2474 -170.5644 47.00 42.00 5.00 348007 SMO 2013 02 06 20 04 00 1486-99 G co CCGG 58.180 -999.990 N.. V2 2013 02 26 10 03 00 -14.2474 -170.5644 47.00 42.00 5.00 347803 SMO 2013 02 06 20 36 00 2401-99 S co CCGG 53.750 -999.990 ... V4 2013 02 20 13 33 00 -14.2474 -170.5644 60.30 42.00 18.30 347802 SMO 2013 02 06 20 36 00 4905-99 S co CCGG 53.730 -999.990 ... V4 2013 02 20 13 18 00 -14.2474 -170.5644 60.30 42.00 18.30 347801 SMO 2013 02 13 01 38 00 2388-99 S co CCGG 64.660 -999.990 ... V2 2013 03 05 11 25 00 -14.2474 -170.5644 60.30 42.00 18.30 348195 SMO 2013 02 13 01 38 00 4711-99 S co CCGG 64.880 -999.990 ... V2 2013 03 05 11 09 00 -14.2474 -170.5644 60.30 42.00 18.30 348194 SMO 2013 02 13 01 50 00 2603-99 G co CCGG 74.870 -999.990 N.. V2 2013 03 05 10 36 00 -14.2474 -170.5644 47.00 42.00 5.00 348192 SMO 2013 02 13 01 50 00 4171-99 G co CCGG 72.770 -999.990 N.. V2 2013 03 05 10 52 00 -14.2474 -170.5644 47.00 42.00 5.00 348193 SMO 2013 02 21 00 36 00 1770-99 S co CCGG 64.900 -999.990 ... V2 2013 03 11 12 20 00 -14.2474 -170.5644 60.30 42.00 18.30 348338 SMO 2013 02 21 00 36 00 3926-99 S co CCGG 64.950 -999.990 ... V2 2013 03 11 12 04 00 -14.2474 -170.5644 60.30 42.00 18.30 348339 SMO 2013 02 21 01 20 00 2333-99 G co CCGG 83.100 -999.990 N.. V2 2013 03 11 11 47 00 -14.2474 -170.5644 47.00 42.00 5.00 348337 SMO 2013 02 21 01 20 00 5319-99 G co CCGG 80.530 -999.990 N.. V2 2013 03 11 11 31 00 -14.2474 -170.5644 47.00 42.00 5.00 348336 SMO 2013 02 26 22 58 00 4034-99 G co CCGG 66.340 -999.990 +.. V2 2013 03 13 11 42 00 -14.2474 -170.5644 47.00 42.00 5.00 348550 SMO 2013 02 26 22 58 00 927-99 G co CCGG 63.530 -999.990 -.. V2 2013 03 13 11 26 00 -14.2474 -170.5644 47.00 42.00 5.00 348549 SMO 2013 02 26 23 38 00 273-99 S co CCGG 55.420 -999.990 ... V2 2013 03 13 11 58 00 -14.2474 -170.5644 60.30 42.00 18.30 348551 SMO 2013 02 26 23 38 00 4831-99 S co CCGG 54.910 -999.990 ... V2 2013 03 13 12 15 00 -14.2474 -170.5644 60.30 42.00 18.30 348552 SMO 2013 03 06 01 13 00 1066-99 G co CCGG 66.470 -999.990 N.. V2 2013 03 20 15 12 00 -14.2474 -170.5644 47.00 42.00 5.00 348806 SMO 2013 03 06 01 13 00 786-99 G co CCGG 65.880 -999.990 N.. V2 2013 03 20 14 56 00 -14.2474 -170.5644 47.00 42.00 5.00 348805 SMO 2013 03 06 01 43 00 6701-66 S co CCGG 60.960 -999.990 ... V2 2013 03 19 14 16 00 -14.2474 -170.5644 60.30 42.00 18.30 348811 SMO 2013 03 14 20 36 00 1764-99 S co CCGG 54.820 -999.990 ... V2 2013 03 25 14 48 00 -14.2474 -170.5644 60.30 42.00 18.30 349243 SMO 2013 03 14 20 36 00 3051-99 S co CCGG 55.000 -999.990 ... V2 2013 03 25 14 32 00 -14.2474 -170.5644 60.30 42.00 18.30 349244 SMO 2013 03 14 23 03 00 1848-99 G co CCGG 61.470 -999.990 N.. V2 2013 03 25 14 16 00 -14.2474 -170.5644 47.00 42.00 5.00 349242 SMO 2013 03 14 23 03 00 3336-99 G co CCGG 64.570 -999.990 N.. V2 2013 03 25 13 59 00 -14.2474 -170.5644 47.00 42.00 5.00 349241 SMO 2013 03 20 22 38 00 5148-99 S co CCGG 45.690 -999.990 ... V2 2013 03 29 13 28 00 -14.2474 -170.5644 60.30 42.00 18.30 349383 SMO 2013 03 20 22 38 00 6605-66 S co CCGG 46.550 -999.990 ... V2 2013 03 29 13 44 00 -14.2474 -170.5644 60.30 42.00 18.30 349384 SMO 2013 03 20 23 16 00 3410-99 G co CCGG 55.860 -999.990 N.. V2 2013 03 29 12 23 00 -14.2474 -170.5644 47.00 42.00 5.00 349385 SMO 2013 03 20 23 16 00 4935-99 G co CCGG 57.460 -999.990 N.. V2 2013 03 29 12 39 00 -14.2474 -170.5644 47.00 42.00 5.00 349386 SMO 2013 03 27 01 42 00 2918-99 S co CCGG 56.240 -999.990 ... V4 2013 04 23 12 41 00 -14.2474 -170.5644 60.30 42.00 18.30 350516 SMO 2013 03 27 01 42 00 4799-99 S co CCGG 55.480 -999.990 ... V4 2013 04 23 12 57 00 -14.2474 -170.5644 60.30 42.00 18.30 350517 SMO 2013 03 27 02 18 00 1629-99 G co CCGG 57.150 -999.990 N.. V4 2013 04 23 12 25 00 -14.2474 -170.5644 47.00 42.00 5.00 350513 SMO 2013 03 27 02 18 00 5288-99 G co CCGG 58.340 -999.990 N.. V4 2013 04 23 12 09 00 -14.2474 -170.5644 47.00 42.00 5.00 350512 SMO 2013 04 01 21 44 00 1094-99 S co CCGG 49.710 -999.990 ... V4 2013 04 23 14 01 00 -14.2474 -170.5644 60.30 42.00 18.30 350518 SMO 2013 04 01 21 44 00 4487-99 S co CCGG 50.190 -999.990 ... V4 2013 04 23 13 45 00 -14.2474 -170.5644 60.30 42.00 18.30 350519 SMO 2013 04 01 22 30 00 2173-99 G co CCGG 60.810 -999.990 N.. V4 2013 04 23 13 29 00 -14.2474 -170.5644 47.00 42.00 5.00 350515 SMO 2013 04 01 22 30 00 952-99 G co CCGG 61.050 -999.990 N.. V4 2013 04 23 13 13 00 -14.2474 -170.5644 47.00 42.00 5.00 350514 SMO 2013 04 17 22 35 00 1011-99 S co CCGG 59.520 -999.990 ... V2 2013 05 14 16 34 00 -14.2474 -170.5644 60.30 42.00 18.30 351343 SMO 2013 04 17 22 35 00 99-99 S co CCGG 59.880 -999.990 ... V2 2013 05 14 16 18 00 -14.2474 -170.5644 60.30 42.00 18.30 351344 SMO 2013 04 17 22 46 00 2087-99 G co CCGG 64.560 -999.990 N.. V2 2013 05 14 15 46 00 -14.2474 -170.5644 47.00 42.00 5.00 351341 SMO 2013 04 17 22 46 00 4648-99 G co CCGG 63.670 -999.990 N.. V2 2013 05 14 16 02 00 -14.2474 -170.5644 47.00 42.00 5.00 351342 SMO 2013 04 24 22 07 00 4157-99 G co CCGG 67.460 -999.990 N.. V2 2013 05 14 14 24 00 -14.2474 -170.5644 47.00 42.00 5.00 351396 SMO 2013 04 24 22 07 00 4878-99 G co CCGG 69.190 -999.990 N.. V2 2013 05 14 14 08 00 -14.2474 -170.5644 47.00 42.00 5.00 351397 SMO 2013 04 24 23 36 00 1763-99 S co CCGG 62.820 -999.990 ... V2 2013 05 14 13 50 00 -14.2474 -170.5644 60.30 42.00 18.30 351394 SMO 2013 04 24 23 36 00 6017-66 S co CCGG 59.460 -999.990 ... V2 2013 05 14 13 34 00 -14.2474 -170.5644 60.30 42.00 18.30 351395 SMO 2013 05 02 00 03 00 2043-99 G co CCGG 64.080 -999.990 N.. V2 2013 05 21 16 23 00 -14.2474 -170.5644 47.00 42.00 5.00 351669 SMO 2013 05 02 00 03 00 2954-99 G co CCGG 65.040 -999.990 N.. V2 2013 05 21 16 40 00 -14.2474 -170.5644 47.00 42.00 5.00 351670 SMO 2013 05 02 00 39 00 101-99 S co CCGG 58.200 -999.990 ... V2 2013 05 22 10 40 00 -14.2474 -170.5644 60.30 42.00 18.30 351671 SMO 2013 05 02 00 39 00 2563-99 S co CCGG 58.520 -999.990 ... V2 2013 05 22 10 56 00 -14.2474 -170.5644 60.30 42.00 18.30 351672 SMO 2013 05 08 22 38 00 3497-99 S co CCGG 51.010 -999.990 ... V4 2013 05 24 11 48 00 -14.2474 -170.5644 60.30 42.00 18.30 352073 SMO 2013 05 08 22 38 00 70-99 S co CCGG 51.340 -999.990 ... V4 2013 05 24 11 32 00 -14.2474 -170.5644 60.30 42.00 18.30 352072 SMO 2013 05 08 23 04 00 1484-99 G co CCGG 60.230 -999.990 N.. V4 2013 05 24 11 16 00 -14.2474 -170.5644 47.00 42.00 5.00 352074 SMO 2013 05 08 23 04 00 4071-99 G co CCGG 59.970 -999.990 N.. V4 2013 05 24 11 00 00 -14.2474 -170.5644 47.00 42.00 5.00 352075 SMO 2013 05 15 22 41 00 1137-99 S co CCGG 55.800 -999.990 ... V4 2013 06 05 13 51 00 -14.2474 -170.5644 60.30 42.00 18.30 352422 SMO 2013 05 15 22 41 00 220-99 S co CCGG 55.570 -999.990 ... V4 2013 06 05 14 07 00 -14.2474 -170.5644 60.30 42.00 18.30 352423 SMO 2013 05 15 22 53 00 2989-99 G co CCGG 64.030 -999.990 N.. V4 2013 06 05 13 19 00 -14.2474 -170.5644 47.00 42.00 5.00 352424 SMO 2013 05 15 22 53 00 5142-99 G co CCGG 63.390 -999.990 N.. V4 2013 06 05 13 35 00 -14.2474 -170.5644 47.00 42.00 5.00 352425 SMO 2013 05 22 21 36 00 4775-99 S co CCGG 54.250 -999.990 ... V4 2013 06 10 14 19 00 -14.2474 -170.5644 60.30 42.00 18.30 352831 SMO 2013 05 22 21 36 00 6413-66 S co CCGG 54.590 -999.990 ... V4 2013 06 10 14 35 00 -14.2474 -170.5644 60.30 42.00 18.30 352832 SMO 2013 05 22 22 03 00 3055-99 G co CCGG 57.780 -999.990 N.. V4 2013 06 10 15 07 00 -14.2474 -170.5644 47.00 42.00 5.00 352834 SMO 2013 05 22 22 03 00 5054-99 G co CCGG 59.130 -999.990 N.. V4 2013 06 10 14 51 00 -14.2474 -170.5644 47.00 42.00 5.00 352833 SMO 2013 05 31 22 56 00 1722-99 G co CCGG 58.690 -999.990 N.. V2 2013 07 01 14 29 00 -14.2474 -170.5644 47.00 42.00 5.00 353764 SMO 2013 05 31 22 56 00 5265-99 G co CCGG 59.540 -999.990 N.. V2 2013 07 01 14 13 00 -14.2474 -170.5644 47.00 42.00 5.00 353763 SMO 2013 05 31 23 37 00 3231-99 S co CCGG 53.510 -999.990 ... V2 2013 07 01 13 40 00 -14.2474 -170.5644 60.30 42.00 18.30 353761 SMO 2013 05 31 23 37 00 4432-99 S co CCGG 52.050 -999.990 ... V2 2013 07 01 13 56 00 -14.2474 -170.5644 60.30 42.00 18.30 353762 SMO 2013 06 06 22 39 00 3782-99 S co CCGG 53.780 -999.990 ... V2 2013 07 01 14 45 00 -14.2474 -170.5644 60.30 42.00 18.30 353765 SMO 2013 06 06 22 39 00 4482-99 S co CCGG 55.090 -999.990 ... V2 2013 07 01 15 01 00 -14.2474 -170.5644 60.30 42.00 18.30 353766 SMO 2013 06 06 23 09 00 2497-99 G co CCGG 61.690 -999.990 N.. V2 2013 07 01 15 17 00 -14.2474 -170.5644 47.00 42.00 5.00 353767 SMO 2013 06 06 23 09 00 4766-99 G co CCGG 62.020 -999.990 N.. V2 2013 07 01 15 34 00 -14.2474 -170.5644 47.00 42.00 5.00 353768 SMO 2013 06 13 00 35 00 4712-99 S co CCGG 53.110 -999.990 ... V4 2013 07 11 11 11 00 -14.2474 -170.5644 60.30 42.00 18.30 354001 SMO 2013 06 13 00 35 00 570-99 S co CCGG 53.190 -999.990 ... V4 2013 07 11 11 27 00 -14.2474 -170.5644 60.30 42.00 18.30 354002 SMO 2013 06 13 00 49 00 3457-99 G co CCGG 60.520 -999.990 N.. V4 2013 07 09 16 19 00 -14.2474 -170.5644 47.00 42.00 5.00 354004 SMO 2013 06 13 00 49 00 3710-99 G co CCGG 60.610 -999.990 N.. V4 2013 07 09 16 03 00 -14.2474 -170.5644 47.00 42.00 5.00 354003 SMO 2013 06 21 00 35 00 1563-99 S co CCGG 58.010 -999.990 ... V4 2013 07 16 09 46 00 -14.2474 -170.5644 60.30 42.00 18.30 354349 SMO 2013 06 21 00 35 00 4647-99 S co CCGG 55.230 -999.990 ... V4 2013 07 16 10 02 00 -14.2474 -170.5644 60.30 42.00 18.30 354350 SMO 2013 06 21 00 50 00 4895-99 G co CCGG 63.070 -999.990 N.. V4 2013 07 16 09 14 00 -14.2474 -170.5644 47.00 42.00 5.00 354351 SMO 2013 06 21 00 50 00 4976-99 G co CCGG 63.290 -999.990 N.. V4 2013 07 16 09 30 00 -14.2474 -170.5644 47.00 42.00 5.00 354352 SMO 2013 06 27 01 56 00 327-99 G co CCGG 60.150 -999.990 N.. V4 2013 07 25 11 17 00 -14.2474 -170.5644 47.00 42.00 5.00 354758 SMO 2013 06 27 01 56 00 5066-99 G co CCGG 59.120 -999.990 N.. V4 2013 07 25 11 33 00 -14.2474 -170.5644 47.00 42.00 5.00 354759 SMO 2013 06 27 02 43 00 4381-99 S co CCGG 53.780 -999.990 ... V4 2013 07 25 12 05 00 -14.2474 -170.5644 60.30 42.00 18.30 354760 SMO 2013 06 27 02 43 00 4836-99 S co CCGG 52.900 -999.990 ... V4 2013 07 25 11 49 00 -14.2474 -170.5644 60.30 42.00 18.30 354761 SMO 2013 07 04 01 08 00 2171-99 G co CCGG 65.940 -999.990 N.. V4 2013 08 01 13 37 00 -14.2474 -170.5644 47.00 42.00 5.00 355112 SMO 2013 07 04 01 08 00 516-99 G co CCGG 66.200 -999.990 N.. V4 2013 08 01 13 21 00 -14.2474 -170.5644 47.00 42.00 5.00 355113 SMO 2013 07 04 02 43 00 1220-99 S co CCGG 55.390 -999.990 ... V4 2013 08 01 14 09 00 -14.2474 -170.5644 60.30 42.00 18.30 355111 SMO 2013 07 04 02 43 00 377-99 S co CCGG 56.980 -999.990 ... V4 2013 08 01 13 53 00 -14.2474 -170.5644 60.30 42.00 18.30 355110 SMO 2013 07 11 01 41 00 4395-99 G co CCGG 61.110 -999.990 N.. V4 2013 08 07 13 43 00 -14.2474 -170.5644 47.00 42.00 5.00 355435 SMO 2013 07 11 01 41 00 6137-66 G co CCGG 60.980 -999.990 N.. V4 2013 08 07 13 27 00 -14.2474 -170.5644 47.00 42.00 5.00 355434 SMO 2013 07 11 02 42 00 1681-99 S co CCGG 53.250 -999.990 ... V4 2013 08 07 14 15 00 -14.2474 -170.5644 60.30 42.00 18.30 355436 SMO 2013 07 11 02 42 00 478-99 S co CCGG 58.220 -999.990 ... V4 2013 08 07 13 59 00 -14.2474 -170.5644 60.30 42.00 18.30 355437 SMO 2013 07 19 00 06 00 3863-99 G co CCGG 65.160 -999.990 N.. V4 2013 08 12 15 52 00 -14.2474 -170.5644 47.00 42.00 5.00 355722 SMO 2013 07 19 00 06 00 5204-99 G co CCGG 64.600 -999.990 N.. V4 2013 08 12 16 08 00 -14.2474 -170.5644 47.00 42.00 5.00 355723 SMO 2013 07 19 02 37 00 2710-99 S co CCGG 55.310 -999.990 ... V4 2013 08 12 15 36 00 -14.2474 -170.5644 60.30 42.00 18.30 355725 SMO 2013 07 19 02 37 00 4391-99 S co CCGG 55.600 -999.990 ... V4 2013 08 12 15 20 00 -14.2474 -170.5644 60.30 42.00 18.30 355724 SMO 2013 07 25 00 14 00 1138-99 G co CCGG 65.100 -999.990 N.. V4 2013 08 13 12 08 00 -14.2474 -170.5644 47.00 42.00 5.00 355726 SMO 2013 07 25 00 14 00 2073-99 G co CCGG 64.150 -999.990 N.. V4 2013 08 13 12 24 00 -14.2474 -170.5644 47.00 42.00 5.00 355727 SMO 2013 07 25 01 36 00 3459-99 S co CCGG 58.870 -999.990 ... V4 2013 08 13 12 40 00 -14.2474 -170.5644 60.30 42.00 18.30 355728 SMO 2013 07 25 01 36 00 4708-99 S co CCGG 58.080 -999.990 ... V4 2013 08 13 12 56 00 -14.2474 -170.5644 60.30 42.00 18.30 355729 SMO 2013 08 01 02 08 00 1308-99 G co CCGG 61.600 -999.990 N.. V4 2013 09 03 10 32 00 -14.2474 -170.5644 47.00 42.00 5.00 356432 SMO 2013 08 01 02 08 00 2674-99 G co CCGG 62.060 -999.990 N.. V4 2013 09 03 10 48 00 -14.2474 -170.5644 47.00 42.00 5.00 356433 SMO 2013 08 01 03 37 00 2881-99 S co CCGG 58.590 -999.990 ... V4 2013 09 03 11 04 00 -14.2474 -170.5644 60.30 42.00 18.30 356434 SMO 2013 08 01 03 37 00 506-99 S co CCGG 58.210 -999.990 ... V4 2013 09 03 11 20 00 -14.2474 -170.5644 60.30 42.00 18.30 356435 SMO 2013 08 07 20 37 00 5171-99 S co CCGG 58.610 -999.990 ... V4 2013 08 26 12 10 00 -14.2474 -170.5644 60.30 42.00 18.30 356437 SMO 2013 08 07 20 37 00 638-99 S co CCGG 60.090 -999.990 ... V4 2013 08 26 12 26 00 -14.2474 -170.5644 60.30 42.00 18.30 356438 SMO 2013 08 07 21 35 00 2732-99 G co CCGG 68.480 -999.990 N.. V4 2013 08 26 11 38 00 -14.2474 -170.5644 47.00 42.00 5.00 356449 SMO 2013 08 07 21 35 00 3222-99 G co CCGG 68.820 -999.990 N.. V4 2013 08 26 11 54 00 -14.2474 -170.5644 47.00 42.00 5.00 356450 SMO 2013 08 16 00 05 00 3289-99 G co CCGG 61.960 -999.990 N.. V3 2013 09 26 13 05 00 -14.2474 -170.5644 47.00 42.00 5.00 357143 SMO 2013 08 16 00 05 00 6900-66 G co CCGG 61.470 -999.990 N.. V3 2013 09 26 13 21 00 -14.2474 -170.5644 47.00 42.00 5.00 357144 SMO 2013 08 16 01 40 00 3064-99 S co CCGG 56.710 -999.990 ... V3 2013 09 26 16 33 00 -14.2474 -170.5644 60.30 42.00 18.30 357145 SMO 2013 08 16 01 40 00 6113-66 S co CCGG -999.990 -999.990 *.. V3 2013 09 26 14 08 00 -14.2474 -170.5644 60.30 42.00 18.30 357146 SMO 2013 08 22 01 39 00 383-99 S co CCGG 56.590 -999.990 ... V4 2013 10 21 12 15 00 -14.2474 -170.5644 60.30 42.00 18.30 357744 SMO 2013 08 22 01 39 00 5186-99 S co CCGG 56.180 -999.990 ... V4 2013 10 21 12 31 00 -14.2474 -170.5644 60.30 42.00 18.30 357745 SMO 2013 08 22 03 43 00 117-99 G co CCGG 60.760 -999.990 N.. V3 2013 10 21 11 22 00 -14.2474 -170.5644 47.00 42.00 5.00 357742 SMO 2013 08 22 03 43 00 1794-99 G co CCGG 60.680 -999.990 N.. V3 2013 10 21 11 38 00 -14.2474 -170.5644 47.00 42.00 5.00 357743 SMO 2013 08 28 21 42 00 1300-99 S co CCGG 56.860 -999.990 ... V3 2013 10 21 12 10 00 -14.2474 -170.5644 60.30 42.00 18.30 357749 SMO 2013 08 28 21 42 00 5277-99 S co CCGG 56.330 -999.990 ... V3 2013 10 21 11 54 00 -14.2474 -170.5644 60.30 42.00 18.30 357748 SMO 2013 08 29 00 17 00 1526-99 G co CCGG 65.130 -999.990 N.. V3 2013 10 21 12 43 00 -14.2474 -170.5644 47.00 42.00 5.00 357746 SMO 2013 08 29 00 17 00 821-99 G co CCGG 66.940 -999.990 N.. V3 2013 10 21 12 27 00 -14.2474 -170.5644 47.00 42.00 5.00 357747 SMO 2013 09 05 00 33 00 1264-99 G co CCGG 66.720 -999.990 N.. V4 2013 10 24 11 35 00 -14.2474 -170.5644 47.00 42.00 5.00 358096 SMO 2013 09 05 00 33 00 3084-99 G co CCGG 65.400 -999.990 N.. V4 2013 10 24 11 51 00 -14.2474 -170.5644 47.00 42.00 5.00 358097 SMO 2013 09 05 04 40 00 1221-99 S co CCGG 54.760 -999.990 ... V4 2013 10 24 11 03 00 -14.2474 -170.5644 60.30 42.00 18.30 358094 SMO 2013 09 05 04 40 00 5248-99 S co CCGG 54.130 -999.990 ... V4 2013 10 24 11 19 00 -14.2474 -170.5644 60.30 42.00 18.30 358095 SMO 2013 09 11 19 55 00 1286-99 G co CCGG 63.970 -999.990 N.. V4 2013 10 31 11 03 00 -14.2474 -170.5644 47.00 42.00 5.00 358620 SMO 2013 09 11 19 55 00 5266-99 G co CCGG 61.840 -999.990 N.. V4 2013 10 31 11 19 00 -14.2474 -170.5644 47.00 42.00 5.00 358621 SMO 2013 09 11 20 40 00 665-99 S co CCGG 56.360 -999.990 ... V4 2013 10 31 12 07 00 -14.2474 -170.5644 60.30 42.00 18.30 358618 SMO 2013 09 11 20 40 00 964-99 S co CCGG 55.630 -999.990 ... V4 2013 10 31 12 23 00 -14.2474 -170.5644 60.30 42.00 18.30 358619 SMO 2013 09 18 19 16 00 3781-99 G co CCGG 66.390 -999.990 N.. V3 2013 10 31 11 12 00 -14.2474 -170.5644 47.00 42.00 5.00 358628 SMO 2013 09 18 19 16 00 4174-99 G co CCGG 66.270 -999.990 N.. V3 2013 10 31 11 29 00 -14.2474 -170.5644 47.00 42.00 5.00 358629 SMO 2013 09 18 19 42 00 1573-99 S co CCGG 59.130 -999.990 ... V3 2013 10 31 11 45 00 -14.2474 -170.5644 60.30 42.00 18.30 358626 SMO 2013 09 18 19 42 00 452-99 S co CCGG 60.080 -999.990 ... V3 2013 10 31 12 01 00 -14.2474 -170.5644 60.30 42.00 18.30 358627 SMO 2013 09 25 20 39 00 2789-99 S co CCGG 64.820 -999.990 ... V3 2013 10 31 14 12 00 -14.2474 -170.5644 60.30 42.00 18.30 358660 SMO 2013 09 25 20 39 00 905-99 S co CCGG 64.550 -999.990 ... V3 2013 10 31 13 56 00 -14.2474 -170.5644 60.30 42.00 18.30 358659 SMO 2013 09 25 21 30 00 3447-99 G co CCGG 71.210 -999.990 N.. V4 2013 10 29 15 38 00 -14.2474 -170.5644 60.30 42.00 18.30 358637 SMO 2013 10 03 00 36 00 2892-99 S co CCGG 62.030 -999.990 ... V3 2013 11 08 10 24 00 -14.2474 -170.5644 60.30 42.00 18.30 358908 SMO 2013 10 03 00 36 00 409-99 S co CCGG 62.320 -999.990 ... V3 2013 11 08 10 08 00 -14.2474 -170.5644 60.30 42.00 18.30 358907 SMO 2013 10 03 01 48 00 3006-99 G co CCGG 69.010 -999.990 N.. V3 2013 11 08 10 57 00 -14.2474 -170.5644 47.00 42.00 5.00 358910 SMO 2013 10 03 01 48 00 4223-99 G co CCGG 68.810 -999.990 N.. V3 2013 11 08 10 41 00 -14.2474 -170.5644 47.00 42.00 5.00 358909 SMO 2013 10 10 01 20 00 2343-99 G co CCGG 67.800 -999.990 N.. V3 2013 11 07 10 51 00 -14.2474 -170.5644 47.00 42.00 5.00 359258 SMO 2013 10 10 01 20 00 4267-99 G co CCGG 67.040 -999.990 N.. V3 2013 11 07 11 07 00 -14.2474 -170.5644 47.00 42.00 5.00 359259 SMO 2013 10 10 03 42 00 153-99 S co CCGG 59.450 -999.990 ... V3 2013 11 07 11 24 00 -14.2474 -170.5644 60.30 42.00 18.30 359252 SMO 2013 10 10 03 42 00 4616-99 S co CCGG 59.270 -999.990 ... V3 2013 11 07 11 40 00 -14.2474 -170.5644 60.30 42.00 18.30 359253 SMO 2013 10 16 19 40 00 3335-99 S co CCGG 63.020 -999.990 ... V4 2013 11 07 10 30 00 -14.2474 -170.5644 60.30 42.00 18.30 359254 SMO 2013 10 16 19 40 00 414-99 S co CCGG 63.260 -999.990 ... V4 2013 11 07 10 46 00 -14.2474 -170.5644 60.30 42.00 18.30 359255 SMO 2013 10 16 22 10 00 2676-99 G co CCGG 72.990 -999.990 N.. V4 2013 11 07 11 02 00 -14.2474 -170.5644 47.00 42.00 5.00 359256 SMO 2013 10 16 22 10 00 4592-99 G co CCGG 72.060 -999.990 N.. V4 2013 11 07 11 18 00 -14.2474 -170.5644 47.00 42.00 5.00 359257 SMO 2013 10 23 22 08 00 3490-99 G co CCGG 78.020 -999.990 N.. V3 2013 11 14 14 28 00 -14.2474 -170.5644 47.00 42.00 5.00 359706 SMO 2013 10 23 22 08 00 4715-99 G co CCGG 77.400 -999.990 N.. V3 2013 11 14 14 45 00 -14.2474 -170.5644 47.00 42.00 5.00 359707 SMO 2013 10 24 00 36 00 4636-99 S co CCGG 61.800 -999.990 ... V3 2013 11 14 15 01 00 -14.2474 -170.5644 60.30 42.00 18.30 359704 SMO 2013 10 24 00 36 00 4656-99 S co CCGG 62.210 -999.990 ... V3 2013 11 14 15 17 00 -14.2474 -170.5644 60.30 42.00 18.30 359705 SMO 2013 10 30 20 05 00 2536-99 G co CCGG 67.720 -999.990 N.. V4 2013 11 19 13 34 00 -14.2474 -170.5644 47.00 42.00 5.00 359989 SMO 2013 10 30 20 05 00 6578-66 G co CCGG 66.480 -999.990 N.. V4 2013 11 19 13 18 00 -14.2474 -170.5644 47.00 42.00 5.00 359990 SMO 2013 10 30 20 40 00 4400-99 S co CCGG 57.860 -999.990 ... V3 2013 11 19 14 20 00 -14.2474 -170.5644 60.30 42.00 18.30 359987 SMO 2013 10 30 20 40 00 4416-99 S co CCGG 57.460 -999.990 ... V3 2013 11 19 14 36 00 -14.2474 -170.5644 60.30 42.00 18.30 359988 SMO 2013 11 06 18 42 00 2533-99 S co CCGG 62.310 -999.990 ... V4 2013 11 27 11 03 00 -14.2474 -170.5644 60.30 42.00 18.30 360659 SMO 2013 11 06 18 42 00 3156-99 S co CCGG 62.430 -999.990 ... V4 2013 11 27 11 19 00 -14.2474 -170.5644 60.30 42.00 18.30 360660 SMO 2013 11 06 20 48 00 4920-99 G co CCGG 73.040 -999.990 N.. V4 2013 11 27 11 35 00 -14.2474 -170.5644 60.30 42.00 18.30 360661 SMO 2013 11 06 20 48 00 5345-99 G co CCGG 73.040 -999.990 N.. V4 2013 11 27 11 51 00 -14.2474 -170.5644 60.30 42.00 18.30 360662 SMO 2013 11 15 21 40 00 1870-99 S co CCGG 57.640 -999.990 ... V4 2013 12 05 14 00 00 -14.2474 -170.5644 60.30 42.00 18.30 361019 SMO 2013 11 15 21 40 00 4003-99 S co CCGG 58.400 -999.990 ... V4 2013 12 05 13 44 00 -14.2474 -170.5644 60.30 42.00 18.30 361018 SMO 2013 11 15 22 25 00 1475-99 G co CCGG 66.560 -999.990 N.. V4 2013 12 05 13 11 00 -14.2474 -170.5644 47.00 42.00 5.00 361020 SMO 2013 11 15 22 25 00 4883-99 G co CCGG 66.250 -999.990 N.. V4 2013 12 05 13 28 00 -14.2474 -170.5644 47.00 42.00 5.00 361021 SMO 2013 11 20 21 16 00 5284-99 G co CCGG 61.560 -999.990 N.. V3 2013 12 11 16 04 00 -14.2474 -170.5644 47.00 42.00 5.00 361276 SMO 2013 11 20 21 16 00 5321-99 G co CCGG 61.010 -999.990 N.. V3 2013 12 11 16 21 00 -14.2474 -170.5644 47.00 42.00 5.00 361277 SMO 2013 11 20 22 38 00 1761-99 S co CCGG 55.760 -999.990 ... V3 2013 12 11 15 32 00 -14.2474 -170.5644 60.30 42.00 18.30 361274 SMO 2013 11 20 22 38 00 2844-99 S co CCGG 60.170 -999.990 ... V3 2013 12 11 15 48 00 -14.2474 -170.5644 60.30 42.00 18.30 361275 SMO 2013 11 27 22 49 00 2938-99 G co CCGG 74.710 -999.990 N.. V4 2014 01 09 13 33 00 -14.2474 -170.5644 47.00 42.00 5.00 362398 SMO 2013 11 27 22 49 00 3760-99 G co CCGG 73.930 -999.990 N.. V4 2014 01 09 13 49 00 -14.2474 -170.5644 47.00 42.00 5.00 362399 SMO 2013 11 27 23 37 00 1500-99 S co CCGG 56.940 -999.990 ... V4 2014 01 09 14 21 00 -14.2474 -170.5644 60.30 42.00 18.30 362396 SMO 2013 11 27 23 37 00 330-99 S co CCGG 56.360 -999.990 ... V4 2014 01 09 14 05 00 -14.2474 -170.5644 60.30 42.00 18.30 362397 SMO 2013 12 05 22 26 00 2722-99 G co CCGG 64.710 -999.990 -.. V4 2014 01 03 12 39 00 -14.2474 -170.5644 47.00 42.00 5.00 362275 SMO 2013 12 05 22 26 00 937-99 G co CCGG 68.160 -999.990 +.. V4 2014 01 03 12 23 00 -14.2474 -170.5644 47.00 42.00 5.00 362274 SMO 2013 12 05 23 40 00 1702-99 S co CCGG 53.790 -999.990 ... V4 2014 01 03 12 55 00 -14.2474 -170.5644 60.30 42.00 18.30 362272 SMO 2013 12 05 23 40 00 2425-99 S co CCGG 51.950 -999.990 ... V4 2014 01 03 13 11 00 -14.2474 -170.5644 60.30 42.00 18.30 362273 SMO 2013 12 11 20 39 00 1293-99 S co CCGG 56.850 -999.990 ... V4 2014 01 21 15 54 00 -14.2474 -170.5644 60.30 42.00 18.30 362741 SMO 2013 12 11 20 39 00 3296-99 S co CCGG 57.640 -999.990 ... V4 2014 01 21 16 10 00 -14.2474 -170.5644 60.30 42.00 18.30 362742 SMO 2013 12 11 22 14 00 152-99 G co CCGG 72.600 -999.990 +.. V4 2014 01 22 12 10 00 -14.2474 -170.5644 47.00 42.00 5.00 362743 SMO 2013 12 11 22 14 00 2686-99 G co CCGG 69.580 -999.990 -.. V4 2014 01 22 12 26 00 -14.2474 -170.5644 47.00 42.00 5.00 362744 SMO 2013 12 19 03 40 00 91-99 S co CCGG 58.830 -999.990 ... V4 2014 01 22 12 42 00 -14.2474 -170.5644 60.30 42.00 18.30 362745 SMO 2013 12 19 03 40 00 92-99 S co CCGG 56.280 -999.990 ... V4 2014 01 22 12 58 00 -14.2474 -170.5644 60.30 42.00 18.30 362746 SMO 2013 12 19 05 35 00 5035-99 G co CCGG 56.590 -999.990 N.. V4 2014 01 22 13 14 00 -14.2474 -170.5644 47.00 42.00 5.00 362747 SMO 2013 12 19 05 35 00 5036-99 G co CCGG 56.290 -999.990 N.. V4 2014 01 22 13 30 00 -14.2474 -170.5644 47.00 42.00 5.00 362748 SMO 2013 12 27 00 37 00 4930-99 S co CCGG 52.650 -999.990 ... V4 2014 01 21 12 26 00 -14.2474 -170.5644 60.30 42.00 18.30 362752 SMO 2013 12 27 00 37 00 499-99 S co CCGG 54.920 -999.990 ... V4 2014 01 21 12 10 00 -14.2474 -170.5644 60.30 42.00 18.30 362751 SMO 2013 12 27 01 40 00 1935-99 G co CCGG 61.600 -999.990 N.. V4 2014 01 21 11 54 00 -14.2474 -170.5644 47.00 42.00 5.00 362754 SMO 2013 12 27 01 40 00 645-99 G co CCGG 63.710 -999.990 N.. V4 2014 01 21 11 38 00 -14.2474 -170.5644 47.00 42.00 5.00 362753 SMO 2014 01 02 21 27 00 128-99 G co CCGG 66.730 -999.990 N.. V4 2014 02 03 12 28 00 -14.2474 -170.5644 47.00 42.00 5.00 363034 SMO 2014 01 02 21 27 00 4279-99 G co CCGG 65.650 -999.990 N.. V4 2014 02 03 12 44 00 -14.2474 -170.5644 47.00 42.00 5.00 363035 SMO 2014 01 02 22 42 00 1967-99 S co CCGG 60.540 -999.990 ... V4 2014 01 30 14 41 00 -14.2474 -170.5644 60.30 42.00 18.30 363032 SMO 2014 01 02 22 42 00 4828-99 S co CCGG 59.940 -999.990 ... V4 2014 01 30 14 57 00 -14.2474 -170.5644 60.30 42.00 18.30 363033 SMO 2014 01 10 01 37 00 2707-99 S co CCGG 58.620 -999.990 ... V3 2014 02 05 16 36 00 -14.2474 -170.5644 60.30 42.00 18.30 363344 SMO 2014 01 10 01 37 00 3447-99 S co CCGG 58.940 -999.990 ... V3 2014 02 05 16 52 00 -14.2474 -170.5644 60.30 42.00 18.30 363345 SMO 2014 01 10 02 37 00 5099-99 G co CCGG 62.120 -999.990 N.. V3 2014 02 05 14 43 00 -14.2474 -170.5644 47.00 42.00 5.00 363346 SMO 2014 01 10 02 37 00 964-99 G co CCGG 62.980 -999.990 N.. V3 2014 02 05 14 27 00 -14.2474 -170.5644 47.00 42.00 5.00 363347 SMO 2014 01 15 20 42 00 1779-99 S co CCGG 51.280 -999.990 ... V4 2014 02 05 15 50 00 -14.2474 -170.5644 60.30 42.00 18.30 363341 SMO 2014 01 15 20 42 00 483-99 S co CCGG 50.790 -999.990 ... V4 2014 02 05 15 34 00 -14.2474 -170.5644 60.30 42.00 18.30 363340 SMO 2014 01 15 21 36 00 1221-99 G co CCGG 65.090 -999.990 N.. V4 2014 02 05 13 58 00 -14.2474 -170.5644 47.00 42.00 5.00 363342 SMO 2014 01 15 21 36 00 1700-99 G co CCGG 63.590 -999.990 N.. V4 2014 02 05 14 14 00 -14.2474 -170.5644 47.00 42.00 5.00 363343 SMO 2014 01 24 00 39 00 2331-99 S co CCGG 56.630 -999.990 ... V3 2014 02 19 12 05 00 -14.2474 -170.5644 60.30 42.00 18.30 363923 SMO 2014 01 24 00 39 00 4244-99 S co CCGG 56.200 -999.990 ... V3 2014 02 19 12 21 00 -14.2474 -170.5644 60.30 42.00 18.30 363924 SMO 2014 01 24 04 10 00 6606-66 G co CCGG 60.730 -999.990 N.. V3 2014 02 19 12 54 00 -14.2474 -170.5644 47.00 42.00 5.00 363922 SMO 2014 01 24 04 10 00 665-99 G co CCGG 61.160 -999.990 N.. V3 2014 02 19 12 38 00 -14.2474 -170.5644 47.00 42.00 5.00 363921 SMO 2014 01 30 03 39 00 3408-99 S co CCGG 58.200 -999.990 ... V3 2014 02 14 11 56 00 -14.2474 -170.5644 60.30 42.00 18.30 363927 SMO 2014 01 30 03 39 00 4333-99 S co CCGG 58.510 -999.990 ... V3 2014 02 14 11 40 00 -14.2474 -170.5644 60.30 42.00 18.30 363928 SMO 2014 01 30 04 55 00 3514-99 G co CCGG 60.220 -999.990 N.. V3 2014 02 14 12 45 00 -14.2474 -170.5644 47.00 42.00 5.00 363929 SMO 2014 01 30 04 55 00 4490-99 G co CCGG 60.120 -999.990 N.. V3 2014 02 14 13 01 00 -14.2474 -170.5644 47.00 42.00 5.00 363930 SMO 2014 02 05 21 42 00 4123-99 S co CCGG 52.550 -999.990 ... V4 2014 02 25 12 03 00 -14.2474 -170.5644 60.30 42.00 18.30 364505 SMO 2014 02 05 21 42 00 4737-99 S co CCGG 53.140 -999.990 ... V4 2014 02 25 12 19 00 -14.2474 -170.5644 60.30 42.00 18.30 364506 SMO 2014 02 05 22 39 00 2790-99 G co CCGG 62.400 -999.990 N.. V4 2014 02 24 15 13 00 -14.2474 -170.5644 47.00 42.00 5.00 364503 SMO 2014 02 05 22 39 00 88-99 G co CCGG 63.610 -999.990 N.. V4 2014 02 24 14 57 00 -14.2474 -170.5644 47.00 42.00 5.00 364504 SMO 2014 02 15 22 37 00 4591-99 S co CCGG 52.440 -999.990 ... V3 2014 03 03 11 52 00 -14.2474 -170.5644 60.30 42.00 18.30 364893 SMO 2014 02 15 22 37 00 4827-99 S co CCGG 52.230 -999.990 ... V3 2014 03 03 12 08 00 -14.2474 -170.5644 60.30 42.00 18.30 364894 SMO 2014 02 15 23 10 00 1691-99 G co CCGG 62.610 -999.990 N.. V3 2014 03 03 11 36 00 -14.2474 -170.5644 47.00 42.00 5.00 364895 SMO 2014 02 15 23 10 00 740-99 G co CCGG 69.870 -999.990 N.. V3 2014 03 03 11 20 00 -14.2474 -170.5644 47.00 42.00 5.00 364896 SMO 2014 02 20 00 40 00 4801-99 S co CCGG 52.870 -999.990 ... V4 2014 03 10 11 05 00 -14.2474 -170.5644 47.00 42.00 5.00 365083 SMO 2014 02 20 00 40 00 5283-99 S co CCGG 52.850 -999.990 ... V4 2014 03 10 11 21 00 -14.2474 -170.5644 47.00 42.00 5.00 365084 SMO 2014 02 20 01 24 00 75-99 G co CCGG 62.920 -999.990 N.. V4 2014 03 10 11 37 00 -14.2474 -170.5644 60.30 42.00 18.30 365085 SMO 2014 02 20 01 24 00 763-99 G co CCGG 61.940 -999.990 N.. V4 2014 03 10 11 53 00 -14.2474 -170.5644 60.30 42.00 18.30 365086 SMO 2014 02 26 20 41 00 1864-99 S co CCGG 58.390 -999.990 ... V3 2014 03 20 10 00 00 -14.2474 -170.5644 60.30 42.00 18.30 365565 SMO 2014 02 26 20 41 00 4416-99 S co CCGG 57.130 -999.990 ... V3 2014 03 20 10 16 00 -14.2474 -170.5644 60.30 42.00 18.30 365566 SMO 2014 02 26 21 51 00 2116-99 G co CCGG 62.930 -999.990 N.. V3 2014 03 20 10 33 00 -14.2474 -170.5644 47.00 42.00 5.00 365594 SMO 2014 02 26 21 51 00 4429-99 G co CCGG 62.200 -999.990 N.. V3 2014 03 20 10 49 00 -14.2474 -170.5644 47.00 42.00 5.00 365595 SMO 2014 03 06 00 00 00 1013-99 G co CCGG 76.530 -999.990 N.. V4 2014 03 25 16 07 00 -14.2474 -170.5644 47.00 42.00 5.00 365801 SMO 2014 03 06 00 00 00 3833-99 G co CCGG 77.080 -999.990 N.. V4 2014 03 25 16 23 00 -14.2474 -170.5644 47.00 42.00 5.00 365802 SMO 2014 03 06 00 41 00 2784-99 S co CCGG 66.800 -999.990 ... V4 2014 03 25 11 19 00 -14.2474 -170.5644 60.30 42.00 18.30 365727 SMO 2014 03 06 00 41 00 3058-99 S co CCGG 67.130 -999.990 ... V4 2014 03 25 11 35 00 -14.2474 -170.5644 60.30 42.00 18.30 365728 SMO 2014 03 13 01 25 00 1145-99 G co CCGG 66.470 -999.990 N.. V4 2014 04 15 15 28 00 -14.2474 -170.5644 47.00 42.00 5.00 366512 SMO 2014 03 13 01 25 00 2135-99 G co CCGG 65.790 -999.990 N.. V4 2014 04 15 15 44 00 -14.2474 -170.5644 47.00 42.00 5.00 366511 SMO 2014 03 13 03 41 00 1017-99 S co CCGG 54.770 -999.990 ... V4 2014 04 15 13 51 00 -14.2474 -170.5644 60.30 42.00 18.30 366509 SMO 2014 03 13 03 41 00 6334-66 S co CCGG 54.290 -999.990 ... V4 2014 04 15 14 07 00 -14.2474 -170.5644 60.30 42.00 18.30 366510 SMO 2014 03 22 05 39 00 1457-99 S co CCGG 49.490 -999.990 ... V4 2014 04 10 10 01 00 -14.2474 -170.5644 60.30 42.00 18.30 366321 SMO 2014 03 22 05 39 00 6701-66 S co CCGG 49.740 -999.990 ... V4 2014 04 10 10 17 00 -14.2474 -170.5644 60.30 42.00 18.30 366322 SMO 2014 03 22 06 02 00 2866-99 G co CCGG 49.990 -999.990 N.. V4 2014 04 10 11 05 00 -14.2474 -170.5644 47.00 42.00 5.00 366319 SMO 2014 03 22 06 02 00 6229-66 G co CCGG 49.370 -999.990 N.. V4 2014 04 10 11 21 00 -14.2474 -170.5644 47.00 42.00 5.00 366320 SMO 2014 03 27 01 37 00 1702-99 S co CCGG 62.440 -999.990 ... V4 2014 04 23 11 09 00 -14.2474 -170.5644 60.30 42.00 18.30 366921 SMO 2014 03 27 01 37 00 5191-99 S co CCGG 58.570 -999.990 ... V4 2014 04 23 11 25 00 -14.2474 -170.5644 60.30 42.00 18.30 366922 SMO 2014 03 27 02 01 00 1-99 G co CCGG 67.900 -999.990 N.. V4 2014 04 21 15 35 00 -14.2474 -170.5644 47.00 42.00 5.00 366814 SMO 2014 03 27 02 01 00 5106-99 G co CCGG 67.690 -999.990 N.. V4 2014 04 21 15 51 00 -14.2474 -170.5644 47.00 42.00 5.00 366815 SMO 2014 04 02 23 15 00 529-99 G co CCGG 64.820 -999.990 N.. V4 2014 04 22 12 25 00 -14.2474 -170.5644 47.00 42.00 5.00 366820 SMO 2014 04 02 23 15 00 609-99 G co CCGG 64.710 -999.990 N.. V4 2014 04 22 12 41 00 -14.2474 -170.5644 47.00 42.00 5.00 366821 SMO 2014 04 03 00 43 00 3600-99 S co CCGG 54.910 -999.990 ... V4 2014 04 22 12 57 00 -14.2474 -170.5644 60.30 42.00 18.30 366806 SMO 2014 04 03 00 43 00 4160-99 S co CCGG 54.830 -999.990 ... V4 2014 04 22 13 13 00 -14.2474 -170.5644 60.30 42.00 18.30 366807 SMO 2014 04 09 20 37 00 1698-99 S co CCGG 47.790 -999.990 ... V4 2014 04 29 14 47 00 -14.2474 -170.5644 60.30 42.00 18.30 367104 SMO 2014 04 09 20 37 00 423-99 S co CCGG 48.900 -999.990 ... V4 2014 04 29 14 31 00 -14.2474 -170.5644 60.30 42.00 18.30 367105 SMO 2014 04 09 22 18 00 2606-99 G co CCGG 54.030 -999.990 N.. V4 2014 04 29 15 03 00 -14.2474 -170.5644 47.00 42.00 5.00 367102 SMO 2014 04 09 22 18 00 5138-99 G co CCGG 53.780 -999.990 N.. V4 2014 04 29 15 19 00 -14.2474 -170.5644 47.00 42.00 5.00 367103 SMO 2014 04 19 00 20 00 3893-99 G co CCGG 60.830 -999.990 N.. V4 2014 05 05 15 49 00 -14.2474 -170.5644 47.00 42.00 5.00 367327 SMO 2014 04 19 00 20 00 6055-66 G co CCGG 60.780 -999.990 N.. V4 2014 05 05 16 05 00 -14.2474 -170.5644 47.00 42.00 5.00 367328 SMO 2014 04 19 01 40 00 2621-99 S co CCGG 52.070 -999.990 ... V4 2014 05 06 09 25 00 -14.2474 -170.5644 60.30 42.00 18.30 367325 SMO 2014 04 19 01 40 00 6593-66 S co CCGG 51.400 -999.990 ... V4 2014 05 06 09 41 00 -14.2474 -170.5644 60.30 42.00 18.30 367326 SMO 2014 04 25 23 28 00 1047-99 G co CCGG 60.610 -999.990 N.. V4 2014 05 20 16 19 00 -14.2474 -170.5644 60.30 42.00 18.30 367779 SMO 2014 04 25 23 28 00 2811-99 G co CCGG 60.270 -999.990 N.. V4 2014 05 20 16 35 00 -14.2474 -170.5644 60.30 42.00 18.30 367780 SMO 2014 04 26 01 40 00 3351-99 S co CCGG 56.190 -999.990 ... V4 2014 05 21 09 33 00 -14.2474 -170.5644 60.30 42.00 18.30 367777 SMO 2014 04 26 01 40 00 3511-99 S co CCGG 54.370 -999.990 ... V4 2014 05 21 09 49 00 -14.2474 -170.5644 60.30 42.00 18.30 367778 SMO 2014 05 01 00 40 00 2371-99 S co CCGG 53.610 -999.990 ... V4 2014 06 06 15 55 00 -14.2474 -170.5644 60.30 42.00 18.30 368531 SMO 2014 05 01 00 40 00 3794-99 S co CCGG 54.090 -999.990 ... V4 2014 06 06 16 11 00 -14.2474 -170.5644 60.30 42.00 18.30 368532 SMO 2014 05 01 02 40 00 2801-99 G co CCGG 56.710 -999.990 N.. V4 2014 06 06 15 22 00 -14.2474 -170.5644 47.00 42.00 5.00 368533 SMO 2014 05 01 02 40 00 6904-66 G co CCGG 57.200 -999.990 N.. V4 2014 06 06 15 39 00 -14.2474 -170.5644 47.00 42.00 5.00 368534 SMO 2014 05 15 01 39 00 3851-99 S co CCGG 52.950 -999.990 ... V4 2014 06 24 10 02 00 -14.2474 -170.5644 60.30 42.00 18.30 369335 SMO 2014 05 15 01 39 00 570-99 S co CCGG 52.070 -999.990 ... V4 2014 06 24 09 46 00 -14.2474 -170.5644 60.30 42.00 18.30 369334 SMO 2014 05 15 04 42 00 2445-99 G co CCGG 52.440 -999.990 N.. V4 2014 06 24 10 34 00 -14.2474 -170.5644 47.00 42.00 5.00 369336 SMO 2014 05 15 04 42 00 951-99 G co CCGG 52.110 -999.990 N.. V4 2014 06 24 10 18 00 -14.2474 -170.5644 47.00 42.00 5.00 369337 SMO 2014 05 24 01 30 00 3042-99 G co CCGG 58.680 -999.990 N.. V4 2014 06 23 17 33 00 -14.2474 -170.5644 47.00 42.00 5.00 369330 SMO 2014 05 24 01 30 00 3757-99 G co CCGG 59.800 -999.990 N.. V4 2014 06 23 17 49 00 -14.2474 -170.5644 47.00 42.00 5.00 369331 SMO 2014 05 24 03 42 00 2531-99 S co CCGG 52.230 -999.990 ... V4 2014 06 24 09 14 00 -14.2474 -170.5644 60.30 42.00 18.30 369332 SMO 2014 05 24 03 42 00 5144-99 S co CCGG 51.350 -999.990 ... V4 2014 06 24 09 30 00 -14.2474 -170.5644 60.30 42.00 18.30 369333 SMO 2014 05 31 01 28 00 1811-99 G co CCGG 58.750 -999.990 N.. V4 2014 07 02 09 14 00 -14.2474 -170.5644 47.00 42.00 5.00 369507 SMO 2014 05 31 01 28 00 4130-99 G co CCGG 59.410 -999.990 N.. V4 2014 07 02 09 30 00 -14.2474 -170.5644 47.00 42.00 5.00 369508 SMO 2014 05 31 04 37 00 2281-99 S co CCGG 52.930 -999.990 ... V4 2014 07 01 17 48 00 -14.2474 -170.5644 60.30 42.00 18.30 369505 SMO 2014 05 31 04 37 00 3735-99 S co CCGG 52.940 -999.990 ... V4 2014 07 01 18 04 00 -14.2474 -170.5644 60.30 42.00 18.30 369506 SMO 2014 06 05 21 37 00 4595-99 S co CCGG 52.440 -999.990 ... V4 2014 07 01 17 16 00 -14.2474 -170.5644 60.30 42.00 18.30 369503 SMO 2014 06 05 21 37 00 4776-99 S co CCGG 52.350 -999.990 ... V4 2014 07 01 17 32 00 -14.2474 -170.5644 60.30 42.00 18.30 369504 SMO 2014 06 06 02 28 00 1712-99 G co CCGG 56.790 -999.990 N.. V4 2014 07 01 16 44 00 -14.2474 -170.5644 47.00 42.00 5.00 369501 SMO 2014 06 06 02 28 00 2525-99 G co CCGG 56.580 -999.990 N.. V4 2014 07 01 17 00 00 -14.2474 -170.5644 47.00 42.00 5.00 369502 SMO 2014 06 12 01 37 00 1031-99 S co CCGG 53.620 -999.990 ... V4 2014 07 23 10 14 00 -14.2474 -170.5644 60.30 42.00 18.30 370701 SMO 2014 06 12 01 37 00 1754-99 S co CCGG 53.730 -999.990 ... V4 2014 07 23 10 30 00 -14.2474 -170.5644 60.30 42.00 18.30 370702 SMO 2014 06 12 02 24 00 3324-99 G co CCGG 55.620 -999.990 N.. V4 2014 07 23 10 46 00 -14.2474 -170.5644 47.00 42.00 5.00 370699 SMO 2014 06 12 02 24 00 4912-99 G co CCGG 55.260 -999.990 N.. V4 2014 07 23 11 02 00 -14.2474 -170.5644 47.00 42.00 5.00 370700 SMO 2014 06 19 01 42 00 1337-99 S co CCGG 53.740 -999.990 ... V4 2014 07 23 15 35 00 -14.2474 -170.5644 60.30 42.00 18.30 370770 SMO 2014 06 19 01 42 00 1740-99 S co CCGG 55.010 -999.990 ... V4 2014 07 23 15 51 00 -14.2474 -170.5644 60.30 42.00 18.30 370771 SMO 2014 06 19 02 27 00 3865-99 G co CCGG 60.610 -999.990 N.. V4 2014 07 23 16 07 00 -14.2474 -170.5644 47.00 42.00 5.00 370768 SMO 2014 06 19 02 27 00 5259-99 G co CCGG 59.690 -999.990 N.. V4 2014 07 23 16 23 00 -14.2474 -170.5644 47.00 42.00 5.00 370769 SMO 2014 06 28 00 42 00 26-99 S co CCGG 57.570 -999.990 ... V4 2014 07 29 12 58 00 -14.2474 -170.5644 60.30 42.00 18.30 371086 SMO 2014 06 28 00 42 00 455-99 S co CCGG 57.630 -999.990 ... V4 2014 07 29 13 14 00 -14.2474 -170.5644 60.30 42.00 18.30 371087 SMO 2014 06 28 01 57 00 4841-99 G co CCGG 61.000 -999.990 N.. V4 2014 07 29 12 26 00 -14.2474 -170.5644 47.00 42.00 5.00 371084 SMO 2014 06 28 01 57 00 6899-66 G co CCGG 60.590 -999.990 N.. V4 2014 07 29 12 42 00 -14.2474 -170.5644 47.00 42.00 5.00 371085 SMO 2014 07 05 22 41 00 451-99 G co CCGG 64.010 -999.990 N.. V4 2014 07 29 11 54 00 -14.2474 -170.5644 47.00 42.00 5.00 371082 SMO 2014 07 05 22 41 00 5074-99 G co CCGG 62.510 -999.990 N.. V4 2014 07 29 12 10 00 -14.2474 -170.5644 47.00 42.00 5.00 371083 SMO 2014 07 05 23 40 00 1642-99 S co CCGG 56.740 -999.990 ... V4 2014 07 29 11 22 00 -14.2474 -170.5644 60.30 42.00 18.30 371080 SMO 2014 07 05 23 40 00 4910-99 S co CCGG 55.980 -999.990 ... V4 2014 07 29 11 38 00 -14.2474 -170.5644 60.30 42.00 18.30 371081 SMO 2014 07 13 02 55 00 1302-99 G co CCGG 60.940 -999.990 N.. V4 2014 08 05 09 42 00 -14.2474 -170.5644 47.00 42.00 5.00 371412 SMO 2014 07 13 02 55 00 1595-99 G co CCGG 60.900 -999.990 N.. V4 2014 08 05 09 58 00 -14.2474 -170.5644 47.00 42.00 5.00 371413 SMO 2014 07 13 03 41 00 1635-99 S co CCGG 57.970 -999.990 ... V4 2014 08 05 09 10 00 -14.2474 -170.5644 60.30 42.00 18.30 371414 SMO 2014 07 13 03 41 00 2124-99 S co CCGG 59.290 -999.990 ... V4 2014 08 05 09 26 00 -14.2474 -170.5644 60.30 42.00 18.30 371415 SMO 2014 07 17 23 18 00 1808-99 G co CCGG 74.910 -999.990 N.. V4 2014 08 14 13 22 00 -14.2474 -170.5644 47.00 42.00 5.00 371940 SMO 2014 07 17 23 18 00 4250-99 G co CCGG 75.120 -999.990 N.. V4 2014 08 14 13 06 00 -14.2474 -170.5644 47.00 42.00 5.00 371939 SMO 2014 07 18 00 37 00 3533-99 S co CCGG 58.680 -999.990 ... V4 2014 08 14 12 34 00 -14.2474 -170.5644 60.30 42.00 18.30 371937 SMO 2014 07 18 00 37 00 6046-66 S co CCGG 59.400 -999.990 ... V4 2014 08 14 12 50 00 -14.2474 -170.5644 60.30 42.00 18.30 371938 SMO 2014 07 22 20 47 00 2450-99 G co CCGG 71.610 -999.990 N.. V4 2014 08 12 10 10 00 -14.2474 -170.5644 47.00 42.00 5.00 372027 SMO 2014 07 22 20 47 00 3227-99 G co CCGG 72.110 -999.990 N.. V4 2014 08 12 10 26 00 -14.2474 -170.5644 47.00 42.00 5.00 372028 SMO 2014 07 22 22 37 00 2104-99 S co CCGG 58.080 -999.990 ... V4 2014 08 12 11 30 00 -14.2474 -170.5644 60.30 42.00 18.30 372025 SMO 2014 07 22 22 37 00 392-99 S co CCGG 56.950 -999.990 ... V4 2014 08 12 11 14 00 -14.2474 -170.5644 60.30 42.00 18.30 372026 SMO 2014 07 30 23 39 00 1647-99 S co CCGG 59.410 -999.990 ... V4 2014 08 21 08 59 00 -14.2474 -170.5644 60.30 42.00 18.30 372457 SMO 2014 07 30 23 50 00 3817-99 G co CCGG 66.400 -999.990 N.. V4 2014 08 21 09 15 00 -14.2474 -170.5644 47.00 42.00 5.00 372455 SMO 2014 08 05 20 34 00 2395-99 G co CCGG 71.400 -999.990 N.. V4 2014 10 07 11 29 00 -14.2474 -170.5644 47.00 42.00 5.00 374970 SMO 2014 08 05 20 34 00 4071-99 G co CCGG 70.680 -999.990 N.. V4 2014 10 07 11 45 00 -14.2474 -170.5644 47.00 42.00 5.00 374971 SMO 2014 08 05 22 37 00 2742-99 S co CCGG 59.060 -999.990 ... V4 2014 10 06 15 26 00 -14.2474 -170.5644 60.30 42.00 18.30 374969 SMO 2014 08 05 22 37 00 3092-99 S co CCGG 58.270 -999.990 ... V4 2014 10 06 15 42 00 -14.2474 -170.5644 60.30 42.00 18.30 374968 SMO 2014 08 12 21 40 00 1806-99 S co CCGG 54.210 -999.990 ... V4 2014 08 27 11 04 00 -14.2474 -170.5644 60.30 42.00 18.30 372943 SMO 2014 08 12 21 40 00 4658-99 S co CCGG 54.710 -999.990 ... V4 2014 08 27 11 20 00 -14.2474 -170.5644 60.30 42.00 18.30 372944 SMO 2014 08 12 21 44 00 1641-99 G co CCGG 66.670 -999.990 N.. V4 2014 09 09 11 17 00 -14.2474 -170.5644 47.00 42.00 5.00 372945 SMO 2014 08 20 17 45 00 506-99 G co CCGG 62.130 -999.990 N.. V4 2014 10 23 12 02 00 -14.2474 -170.5644 47.00 42.00 5.00 376104 SMO 2014 08 20 17 45 00 715-99 G co CCGG 87.070 -999.990 N.. V4 2014 10 23 12 18 00 -14.2474 -170.5644 47.00 42.00 5.00 376105 SMO 2014 08 21 18 35 00 1751-99 S co CCGG 60.210 -999.990 ... V4 2014 10 21 14 24 00 -14.2474 -170.5644 60.30 42.00 18.30 375887 SMO 2014 08 21 18 35 00 2657-99 S co CCGG 60.970 -999.990 ... V4 2014 10 21 14 08 00 -14.2474 -170.5644 60.30 42.00 18.30 375888 SMO 2014 08 27 22 41 00 2998-99 G co CCGG 75.100 -999.990 N.. V4 2014 09 23 14 53 00 -14.2474 -170.5644 47.00 42.00 5.00 374385 SMO 2014 08 27 22 41 00 4634-99 G co CCGG 75.950 -999.990 N.. V4 2014 09 23 14 37 00 -14.2474 -170.5644 47.00 42.00 5.00 374386 SMO 2014 08 27 23 35 00 369-99 S co CCGG 59.930 -999.990 ... V4 2014 09 24 10 46 00 -14.2474 -170.5644 60.30 42.00 18.30 374397 SMO 2014 08 27 23 35 00 4527-99 S co CCGG 64.470 -999.990 ... V4 2014 09 24 10 30 00 -14.2474 -170.5644 60.30 42.00 18.30 374398 SMO 2014 09 02 19 35 00 3595-99 S co CCGG 61.460 -999.990 ... V4 2014 09 19 12 29 00 -14.2474 -170.5644 60.30 42.00 18.30 374238 SMO 2014 09 02 19 35 00 5001-99 S co CCGG 60.520 -999.990 ... V4 2014 09 19 12 13 00 -14.2474 -170.5644 60.30 42.00 18.30 374239 SMO 2014 09 02 20 02 00 2231-99 G co CCGG 67.820 -999.990 N.. V4 2014 09 19 12 45 00 -14.2474 -170.5644 47.00 42.00 5.00 374236 SMO 2014 09 02 20 02 00 2360-99 G co CCGG 67.400 -999.990 N.. V4 2014 09 19 13 01 00 -14.2474 -170.5644 47.00 42.00 5.00 374237 SMO 2014 09 15 18 47 00 4571-99 G co CCGG 60.150 -999.990 N.. V4 2014 10 07 12 01 00 -14.2474 -170.5644 47.00 42.00 5.00 374972 SMO 2014 09 15 18 47 00 653-99 G co CCGG 60.930 -999.990 N.. V4 2014 10 07 12 17 00 -14.2474 -170.5644 47.00 42.00 5.00 374973 SMO 2014 09 15 20 35 00 3132-99 S co CCGG 57.440 -999.990 ... V4 2014 10 07 12 49 00 -14.2474 -170.5644 60.30 42.00 18.30 374974 SMO 2014 09 15 20 35 00 3400-99 S co CCGG 57.050 -999.990 ... V4 2014 10 07 12 33 00 -14.2474 -170.5644 60.30 42.00 18.30 374975 SMO 2014 09 22 18 37 00 5060-99 G co CCGG 62.100 -999.990 N.. V4 2014 10 15 14 52 00 -14.2474 -170.5644 47.00 42.00 5.00 375551 SMO 2014 09 22 18 37 00 5069-99 G co CCGG 61.520 -999.990 N.. V4 2014 10 15 14 36 00 -14.2474 -170.5644 47.00 42.00 5.00 375552 SMO 2014 09 22 19 36 00 1421-99 S co CCGG 56.820 -999.990 ... V4 2014 10 15 15 24 00 -14.2474 -170.5644 60.30 42.00 18.30 375549 SMO 2014 09 22 19 36 00 5278-99 S co CCGG 56.820 -999.990 ... V4 2014 10 15 15 08 00 -14.2474 -170.5644 60.30 42.00 18.30 375550 SMO 2014 09 30 01 00 00 4487-99 G co CCGG 77.630 -999.990 N.. V4 2014 11 21 14 35 00 -14.2474 -170.5644 47.00 42.00 5.00 377156 SMO 2014 09 30 01 00 00 4893-99 G co CCGG 78.780 -999.990 N.. V4 2014 11 21 14 19 00 -14.2474 -170.5644 47.00 42.00 5.00 377155 SMO 2014 09 30 04 42 00 3392-99 S co CCGG 55.960 -999.990 ... V4 2014 11 21 14 03 00 -14.2474 -170.5644 60.30 42.00 18.30 377159 SMO 2014 09 30 04 42 00 633-99 S co CCGG 56.870 -999.990 ... V4 2014 11 21 13 47 00 -14.2474 -170.5644 60.30 42.00 18.30 377160 SMO 2014 10 06 19 30 00 2904-99 G co CCGG 68.740 -999.990 N.. V4 2014 10 27 13 01 00 -14.2474 -170.5644 47.00 42.00 5.00 376212 SMO 2014 10 06 19 30 00 4293-99 G co CCGG 68.680 -999.990 N.. V4 2014 10 27 12 45 00 -14.2474 -170.5644 47.00 42.00 5.00 376211 SMO 2014 10 06 22 35 00 2616-99 S co CCGG 61.370 -999.990 ... V4 2014 10 27 12 13 00 -14.2474 -170.5644 60.30 42.00 18.30 376206 SMO 2014 10 06 22 35 00 4028-99 S co CCGG 61.680 -999.990 ... V4 2014 10 27 12 29 00 -14.2474 -170.5644 60.30 42.00 18.30 376205 SMO 2014 10 13 21 48 00 2466-99 G co CCGG 78.810 -999.990 N.. V4 2014 10 27 11 41 00 -14.2474 -170.5644 47.00 42.00 5.00 376209 SMO 2014 10 13 21 48 00 4841-99 G co CCGG 79.900 -999.990 N.. V4 2014 10 27 11 57 00 -14.2474 -170.5644 47.00 42.00 5.00 376210 SMO 2014 10 13 23 40 00 1044-99 S co CCGG 60.000 -999.990 ... V4 2014 10 27 11 09 00 -14.2474 -170.5644 60.30 42.00 18.30 376207 SMO 2014 10 13 23 40 00 6899-66 S co CCGG 60.250 -999.990 ... V4 2014 10 27 11 25 00 -14.2474 -170.5644 60.30 42.00 18.30 376208 SMO 2014 10 23 22 30 00 754-99 G co CCGG 76.690 -999.990 N.. V4 2014 11 19 12 26 00 -14.2474 -170.5644 47.00 42.00 5.00 377149 SMO 2014 10 23 22 30 00 928-99 G co CCGG 76.050 -999.990 N.. V4 2014 11 19 12 42 00 -14.2474 -170.5644 47.00 42.00 5.00 377150 SMO 2014 10 23 23 35 00 3639-99 S co CCGG 64.500 -999.990 ... V4 2014 11 19 11 54 00 -14.2474 -170.5644 60.30 42.00 18.30 377151 SMO 2014 10 23 23 35 00 930-99 S co CCGG 63.770 -999.990 ... V4 2014 11 19 12 10 00 -14.2474 -170.5644 60.30 42.00 18.30 377152 SMO 2014 10 29 20 12 00 232-99 G co CCGG 72.810 -999.990 N.. V4 2014 11 21 13 31 00 -14.2474 -170.5644 47.00 42.00 5.00 377154 SMO 2014 10 29 20 12 00 966-99 G co CCGG 72.280 -999.990 N.. V4 2014 11 21 13 15 00 -14.2474 -170.5644 47.00 42.00 5.00 377153 SMO 2014 10 29 20 37 00 1020-99 S co CCGG 63.880 -999.990 ... V4 2014 11 21 12 59 00 -14.2474 -170.5644 60.30 42.00 18.30 377157 SMO 2014 10 29 20 37 00 413-99 S co CCGG 63.280 -999.990 ... V4 2014 11 21 12 43 00 -14.2474 -170.5644 60.30 42.00 18.30 377158 SMO 2014 11 03 19 55 00 1616-99 G co CCGG 67.140 -999.990 N.. V4 2014 11 26 11 32 00 -14.2474 -170.5644 47.00 42.00 5.00 377608 SMO 2014 11 03 19 55 00 6051-66 G co CCGG 66.950 -999.990 N.. V4 2014 11 26 11 16 00 -14.2474 -170.5644 47.00 42.00 5.00 377609 SMO 2014 11 03 23 40 00 1050-99 S co CCGG 64.560 -999.990 ... V4 2014 11 26 11 48 00 -14.2474 -170.5644 60.30 42.00 18.30 377606 SMO 2014 11 03 23 40 00 2435-99 S co CCGG 64.540 -999.990 ... V4 2014 11 26 12 04 00 -14.2474 -170.5644 60.30 42.00 18.30 377607 SMO 2014 11 09 22 15 00 3781-99 G co CCGG 85.930 -999.990 +.. V4 2015 02 04 13 30 00 -14.2474 -170.5644 47.00 42.00 5.00 380695 SMO 2014 11 09 22 15 00 4389-99 G co CCGG 80.360 -999.990 -.. V4 2015 02 04 13 46 00 -14.2474 -170.5644 47.00 42.00 5.00 380696 SMO 2014 11 09 23 35 00 4174-99 S co CCGG 63.560 -999.990 ... V4 2015 02 04 14 02 00 -14.2474 -170.5644 60.30 42.00 18.30 380694 SMO 2014 11 09 23 35 00 4253-99 S co CCGG 61.760 -999.990 ... V4 2015 02 04 14 18 00 -14.2474 -170.5644 60.30 42.00 18.30 380693 SMO 2014 11 10 21 25 00 1037-99 G co CCGG 78.840 -999.990 N.. V4 2015 01 05 11 07 00 -14.2474 -170.5644 47.00 42.00 5.00 379313 SMO 2014 11 11 03 35 00 1760-99 S co CCGG 101.720 -999.990 N.. V4 2015 01 05 11 58 00 -14.2474 -170.5644 60.30 42.00 18.30 379312 SMO 2014 11 11 03 35 00 2456-99 S co CCGG 135.660 -999.990 N.. V4 2015 01 05 11 42 00 -14.2474 -170.5644 60.30 42.00 18.30 379311 SMO 2014 11 17 19 35 00 1089-99 S co CCGG 62.580 -999.990 ... V4 2014 12 19 16 46 00 -14.2474 -170.5644 60.30 42.00 18.30 378847 SMO 2014 11 17 19 35 00 1778-99 S co CCGG 63.670 -999.990 N.. V4 2014 12 19 16 30 00 -14.2474 -170.5644 60.30 42.00 18.30 378848 SMO 2014 11 17 22 16 00 1471-99 G co CCGG 86.830 -999.990 N.. V4 2014 12 17 13 45 00 -14.2474 -170.5644 47.00 42.00 5.00 378524 SMO 2014 11 17 22 16 00 948-99 G co CCGG 87.520 -999.990 N.. V4 2014 12 17 13 29 00 -14.2474 -170.5644 47.00 42.00 5.00 378523 SMO 2014 11 24 18 52 00 318-99 S co CCGG 105.550 -999.990 N.. V4 2014 12 18 10 21 00 -14.2474 -170.5644 60.30 42.00 18.30 378537 SMO 2014 11 24 18 52 00 4674-99 S co CCGG 70.050 -999.990 N.. V4 2014 12 18 10 37 00 -14.2474 -170.5644 60.30 42.00 18.30 378538 SMO 2014 12 09 23 38 00 3652-99 G co CCGG 65.240 -999.990 N.. V4 2015 01 05 13 02 00 -14.2474 -170.5644 47.00 42.00 5.00 379319 SMO 2014 12 09 23 38 00 4255-99 G co CCGG 63.580 -999.990 N.. V4 2015 01 05 12 46 00 -14.2474 -170.5644 47.00 42.00 5.00 379318 SMO 2014 12 10 00 39 00 620-99 S co CCGG 63.820 -999.990 N.. V4 2015 01 05 12 30 00 -14.2474 -170.5644 60.30 42.00 18.30 379320 SMO 2014 12 10 00 39 00 798-99 S co CCGG 53.960 -999.990 N.. V4 2015 01 05 12 14 00 -14.2474 -170.5644 60.30 42.00 18.30 379321 SMO 2014 12 13 21 40 00 1858-99 S co CCGG 62.670 -999.990 ... V4 2015 02 11 16 43 00 -14.2474 -170.5644 60.30 42.00 18.30 380880 SMO 2014 12 13 21 40 00 391-99 S co CCGG 62.490 -999.990 ... V4 2015 02 11 16 27 00 -14.2474 -170.5644 60.30 42.00 18.30 380881 SMO 2014 12 13 22 01 00 1945-99 G co CCGG 79.250 -999.990 N.. V4 2015 02 11 16 59 00 -14.2474 -170.5644 47.00 42.00 5.00 380878 SMO 2014 12 13 22 01 00 5070-99 G co CCGG 78.470 -999.990 N.. V4 2015 02 11 17 15 00 -14.2474 -170.5644 47.00 42.00 5.00 380879 SMO 2014 12 19 19 36 00 3156-99 S co CCGG 81.650 -999.990 N.. V4 2015 02 06 11 50 00 -14.2474 -170.5644 60.30 42.00 18.30 380686 SMO 2014 12 19 19 36 00 4497-99 S co CCGG 140.240 -999.990 N.. V4 2015 02 06 12 06 00 -14.2474 -170.5644 60.30 42.00 18.30 380685 SMO 2014 12 19 20 19 00 1914-99 G co CCGG 62.790 -999.990 N.. V4 2015 02 06 12 38 00 -14.2474 -170.5644 47.00 42.00 5.00 380687 SMO 2014 12 19 20 19 00 3571-99 G co CCGG 68.370 -999.990 N.. V4 2015 02 06 12 22 00 -14.2474 -170.5644 47.00 42.00 5.00 380688 SMO 2014 12 22 19 36 00 4527-99 S co CCGG 150.020 -999.990 N.. V4 2015 02 06 11 18 00 -14.2474 -170.5644 60.30 42.00 18.30 380681 SMO 2014 12 22 19 36 00 4862-99 S co CCGG 89.650 -999.990 N.. V4 2015 02 06 11 34 00 -14.2474 -170.5644 60.30 42.00 18.30 380682 SMO 2014 12 22 21 46 00 369-99 G co CCGG 63.150 -999.990 N.. V4 2015 02 06 11 02 00 -14.2474 -170.5644 47.00 42.00 5.00 380683 SMO 2014 12 22 21 46 00 5286-99 G co CCGG 61.650 -999.990 N.. V4 2015 02 06 10 46 00 -14.2474 -170.5644 47.00 42.00 5.00 380684 SMO 2014 12 31 23 39 00 1091-22 S co CCGG 60.300 -999.990 ... V4 2015 02 02 10 25 00 -14.2474 -170.5644 60.30 42.00 18.30 381327 SMO 2014 12 31 23 39 00 17-22 S co CCGG 60.670 -999.990 ... V4 2015 02 02 10 09 00 -14.2474 -170.5644 60.30 42.00 18.30 381328 SMO 2015 01 01 00 07 00 0041-22 G co CCGG 79.920 -999.990 N.. V4 2015 02 02 09 36 00 -14.2474 -170.5644 47.00 42.00 5.00 381325 SMO 2015 01 01 00 07 00 1077-22 G co CCGG 80.010 -999.990 N.. V4 2015 02 02 09 52 00 -14.2474 -170.5644 47.00 42.00 5.00 381326 SMO 2015 01 12 20 37 00 2232-99 S co CCGG 73.710 -999.990 N.. V4 2015 03 23 11 41 00 -14.2474 -170.5644 60.30 42.00 18.30 382949 SMO 2015 01 12 20 37 00 5002-99 S co CCGG 115.720 -999.990 N.. V4 2015 03 23 11 25 00 -14.2474 -170.5644 60.30 42.00 18.30 382948 SMO 2015 01 12 21 58 00 6594-66 G co CCGG 82.270 -999.990 N.. V4 2015 03 23 10 37 00 -14.2474 -170.5644 47.00 42.00 5.00 382950 SMO 2015 01 12 21 58 00 745-99 G co CCGG 82.920 -999.990 N.. V4 2015 03 23 10 21 00 -14.2474 -170.5644 47.00 42.00 5.00 382951 SMO 2015 01 19 18 35 00 915-99 S co CCGG 54.430 -999.990 ... V4 2015 03 19 11 58 00 -14.2474 -170.5644 60.30 42.00 18.30 381808 SMO 2015 01 19 19 16 00 1689-99 G co CCGG 67.170 -999.990 N.. V4 2015 03 04 16 49 00 -14.2474 -170.5644 47.00 42.00 5.00 381809 SMO 2015 01 19 19 16 00 4054-99 G co CCGG 67.140 -999.990 N.. V4 2015 03 04 16 33 00 -14.2474 -170.5644 47.00 42.00 5.00 381810 SMO 2015 01 27 00 36 00 137-99 S co CCGG 60.880 -999.990 ... V4 2015 03 02 13 18 00 -14.2474 -170.5644 60.30 42.00 18.30 381800 SMO 2015 01 27 00 36 00 1449-99 S co CCGG 59.420 -999.990 ... V4 2015 03 02 13 34 00 -14.2474 -170.5644 60.30 42.00 18.30 381801 SMO 2015 01 27 01 08 00 4056-99 G co CCGG 87.010 -999.990 N.. V4 2015 03 02 13 50 00 -14.2474 -170.5644 47.00 42.00 5.00 381802 SMO 2015 01 27 01 08 00 5142-99 G co CCGG 81.500 -999.990 N.. V4 2015 03 02 14 06 00 -14.2474 -170.5644 47.00 42.00 5.00 381803 SMO 2015 02 02 20 42 00 2260-99 S co CCGG 63.650 -999.990 ... V4 2015 03 06 12 40 00 -14.2474 -170.5644 60.30 42.00 18.30 382094 SMO 2015 02 02 20 42 00 801-99 S co CCGG 63.720 -999.990 ... V4 2015 03 06 12 24 00 -14.2474 -170.5644 60.30 42.00 18.30 382093 SMO 2015 02 02 23 48 00 2534-99 G co CCGG 76.230 -999.990 N.. V4 2015 03 09 16 51 00 -14.2474 -170.5644 47.00 42.00 5.00 382348 SMO 2015 02 02 23 48 00 2777-99 G co CCGG 76.340 -999.990 N.. V4 2015 03 09 16 36 00 -14.2474 -170.5644 47.00 42.00 5.00 382349 SMO 2015 02 10 00 40 00 6114-66 S co CCGG 59.550 -999.990 ... V4 2015 04 07 12 45 00 -14.2474 -170.5644 60.30 42.00 18.30 384019 SMO 2015 02 10 00 40 00 798-99 S co CCGG 59.030 -999.990 ... V4 2015 04 07 12 29 00 -14.2474 -170.5644 60.30 42.00 18.30 384020 SMO 2015 02 10 01 13 00 1593-99 G co CCGG 77.170 -999.990 N.. V4 2015 04 07 13 16 00 -14.2474 -170.5644 47.00 42.00 5.00 384017 SMO 2015 02 10 01 13 00 620-99 G co CCGG 76.570 -999.990 N.. V4 2015 04 07 13 01 00 -14.2474 -170.5644 47.00 42.00 5.00 384018 SMO 2015 02 16 19 40 00 3131-99 S co CCGG 59.250 -999.990 ... V4 2015 03 20 17 44 00 -14.2474 -170.5644 60.30 42.00 18.30 382946 SMO 2015 02 16 19 40 00 4827-99 S co CCGG 59.240 -999.990 ... V4 2015 03 20 17 29 00 -14.2474 -170.5644 60.30 42.00 18.30 382947 SMO 2015 02 16 20 46 00 1760-99 G co CCGG 74.100 -999.990 N.. V4 2015 03 24 11 55 00 -14.2474 -170.5644 47.00 42.00 5.00 382944 SMO 2015 02 16 20 46 00 4711-99 G co CCGG 70.290 -999.990 N.. V4 2015 03 24 12 11 00 -14.2474 -170.5644 47.00 42.00 5.00 382945 SMO 2015 02 25 22 47 00 3533-99 G co CCGG 60.720 -999.990 N.. V4 2015 03 27 10 53 00 -14.2474 -170.5644 47.00 42.00 5.00 383141 SMO 2015 02 25 22 47 00 4157-99 G co CCGG 62.180 -999.990 N.. V4 2015 03 27 11 09 00 -14.2474 -170.5644 47.00 42.00 5.00 383142 SMO 2015 02 26 02 25 00 1421-99 S co CCGG 49.830 -999.990 ... V4 2015 03 27 11 25 00 -14.2474 -170.5644 60.30 42.00 18.30 383143 SMO 2015 02 26 02 25 00 5278-99 S co CCGG 49.880 -999.990 ... V4 2015 03 27 11 40 00 -14.2474 -170.5644 60.30 42.00 18.30 383144 SMO 2015 03 02 22 05 00 2930-99 G co CCGG 71.120 -999.990 N.. V4 2015 04 07 10 38 00 -14.2474 -170.5644 47.00 42.00 5.00 384013 SMO 2015 03 02 22 05 00 2965-99 G co CCGG 69.880 -999.990 N.. V4 2015 04 07 10 54 00 -14.2474 -170.5644 47.00 42.00 5.00 384014 SMO 2015 03 02 23 35 00 3049-99 S co CCGG 55.440 -999.990 ... V4 2015 04 07 11 57 00 -14.2474 -170.5644 60.30 42.00 18.30 384016 SMO 2015 03 02 23 35 00 933-99 S co CCGG 54.460 -999.990 ... V4 2015 04 07 12 13 00 -14.2474 -170.5644 60.30 42.00 18.30 384015 SMO 2015 03 09 23 57 00 179-99 G co CCGG 69.290 -999.990 N.. V4 2015 05 05 10 59 00 -14.2474 -170.5644 47.00 42.00 5.00 385549 SMO 2015 03 09 23 57 00 2958-99 G co CCGG 74.350 -999.990 N.. V4 2015 05 05 10 44 00 -14.2474 -170.5644 47.00 42.00 5.00 385548 SMO 2015 03 10 00 36 00 3914-99 S co CCGG 59.650 -999.990 ... V4 2015 05 05 10 24 00 -14.2474 -170.5644 60.30 42.00 18.30 385546 SMO 2015 03 10 00 36 00 619-99 S co CCGG 58.930 -999.990 ... V4 2015 05 05 10 08 00 -14.2474 -170.5644 60.30 42.00 18.30 385547 SMO 2015 03 18 22 37 00 3539-99 S co CCGG 72.450 -999.990 .X. V4 2015 04 20 14 12 00 -14.2474 -170.5644 60.30 42.00 18.30 384901 SMO 2015 03 18 22 37 00 4529-99 S co CCGG 71.400 -999.990 .X. V4 2015 04 20 13 56 00 -14.2474 -170.5644 60.30 42.00 18.30 384900 SMO 2015 03 18 23 02 00 4513-99 G co CCGG 87.870 -999.990 N.. V4 2015 04 20 14 47 00 -14.2474 -170.5644 47.00 42.00 5.00 384898 SMO 2015 03 18 23 02 00 4597-99 G co CCGG 87.020 -999.990 N.. V4 2015 04 20 14 31 00 -14.2474 -170.5644 47.00 42.00 5.00 384899 SMO 2015 03 25 22 30 00 789-99 G co CCGG 62.530 -999.990 N.. V4 2015 05 04 13 18 00 -14.2474 -170.5644 47.00 42.00 5.00 385716 SMO 2015 03 25 22 30 00 820-99 G co CCGG 65.030 -999.990 N.. V4 2015 05 04 13 34 00 -14.2474 -170.5644 47.00 42.00 5.00 385717 SMO 2015 03 29 20 43 00 3319-99 S co CCGG 51.770 -999.990 ... V4 2015 05 04 12 31 00 -14.2474 -170.5644 60.30 42.00 18.30 385714 SMO 2015 03 29 20 43 00 4837-99 S co CCGG 52.510 -999.990 ... V4 2015 05 04 12 15 00 -14.2474 -170.5644 60.30 42.00 18.30 385715 SMO 2015 03 31 21 38 00 3713-99 S co CCGG 63.600 -999.990 ... V4 2015 05 06 14 36 00 -14.2474 -170.5644 60.30 42.00 18.30 385768 SMO 2015 03 31 21 38 00 4939-99 S co CCGG 63.760 -999.990 ... V4 2015 05 06 14 20 00 -14.2474 -170.5644 60.30 42.00 18.30 385767 SMO 2015 03 31 22 03 00 1289-99 G co CCGG 73.200 -999.990 N.. V4 2015 05 06 15 08 00 -14.2474 -170.5644 47.00 42.00 5.00 385769 SMO 2015 03 31 22 03 00 1629-99 G co CCGG 73.370 -999.990 N.. V4 2015 05 06 14 52 00 -14.2474 -170.5644 47.00 42.00 5.00 385770 SMO 2015 04 05 21 39 00 3709-99 S co CCGG 58.820 -999.990 ... V4 2015 05 13 09 07 00 -14.2474 -170.5644 60.30 42.00 18.30 386184 SMO 2015 04 05 21 39 00 4763-99 S co CCGG 58.260 -999.990 ... V4 2015 05 13 08 51 00 -14.2474 -170.5644 60.30 42.00 18.30 386183 SMO 2015 04 05 22 01 00 2303-99 G co CCGG 71.890 -999.990 N.. V4 2015 05 13 08 35 00 -14.2474 -170.5644 47.00 42.00 5.00 386185 SMO 2015 04 05 22 01 00 3816-99 G co CCGG 70.920 -999.990 N.. V4 2015 05 13 08 19 00 -14.2474 -170.5644 47.00 42.00 5.00 386186 SMO 2015 04 12 22 43 00 2339-99 S co CCGG 56.210 -999.990 ... V4 2015 06 12 14 41 00 -14.2474 -170.5644 60.30 42.00 18.30 387645 SMO 2015 04 12 22 43 00 5218-99 S co CCGG 55.170 -999.990 ... V4 2015 06 12 14 25 00 -14.2474 -170.5644 60.30 42.00 18.30 387644 SMO 2015 04 12 23 05 00 1207-99 G co CCGG 70.520 -999.990 N.. V4 2015 06 15 16 34 00 -14.2474 -170.5644 47.00 42.00 5.00 387646 SMO 2015 04 12 23 05 00 5348-99 G co CCGG 70.270 -999.990 N.. V4 2015 06 15 16 18 00 -14.2474 -170.5644 47.00 42.00 5.00 387647 SMO 2015 04 19 21 13 00 1612-99 G co CCGG 60.310 -999.990 N.. V4 2015 06 11 12 46 00 -14.2474 -170.5644 47.00 42.00 5.00 387218 SMO 2015 04 19 21 13 00 4053-99 G co CCGG 59.550 -999.990 N.. V4 2015 06 11 13 01 00 -14.2474 -170.5644 47.00 42.00 5.00 387219 SMO 2015 04 19 22 42 00 3667-99 S co CCGG 50.110 -999.990 ... V4 2015 06 11 13 33 00 -14.2474 -170.5644 60.30 42.00 18.30 387217 SMO 2015 04 19 22 42 00 5223-99 S co CCGG 50.230 -999.990 ... V4 2015 06 11 13 17 00 -14.2474 -170.5644 60.30 42.00 18.30 387216 SMO 2015 04 28 22 16 00 1578-99 G co CCGG 68.560 -999.990 N.. V4 2015 06 09 12 49 00 -14.2474 -170.5644 47.00 42.00 5.00 387141 SMO 2015 04 28 22 16 00 2811-99 G co CCGG 67.480 -999.990 N.. V4 2015 06 09 12 33 00 -14.2474 -170.5644 47.00 42.00 5.00 387140 SMO 2015 04 29 01 40 00 1047-99 S co CCGG 55.170 -999.990 ... V4 2015 06 09 13 21 00 -14.2474 -170.5644 60.30 42.00 18.30 387142 SMO 2015 04 29 01 40 00 507-99 S co CCGG 55.680 -999.990 ... V4 2015 06 09 13 05 00 -14.2474 -170.5644 60.30 42.00 18.30 387143 SMO 2015 05 03 23 36 00 4552-99 S co CCGG 50.690 -999.990 ... V4 2015 06 22 14 35 00 -14.2474 -170.5644 60.30 42.00 18.30 388074 SMO 2015 05 03 23 36 00 5113-99 S co CCGG 50.740 -999.990 ... V4 2015 06 22 14 19 00 -14.2474 -170.5644 60.30 42.00 18.30 388073 SMO 2015 05 04 00 23 00 406-99 G co CCGG 64.890 -999.990 N.. V4 2015 06 22 13 48 00 -14.2474 -170.5644 47.00 42.00 5.00 388075 SMO 2015 05 04 00 23 00 4662-99 G co CCGG 63.440 -999.990 N.. V4 2015 06 22 14 03 00 -14.2474 -170.5644 47.00 42.00 5.00 388076 SMO 2015 05 11 20 34 00 2660-99 S co CCGG 49.740 -999.990 ... V4 2015 06 25 12 01 00 -14.2474 -170.5644 60.30 42.00 18.30 388093 SMO 2015 05 11 20 34 00 587-99 S co CCGG 51.020 -999.990 ... V4 2015 06 25 12 17 00 -14.2474 -170.5644 60.30 42.00 18.30 388094 SMO 2015 05 11 21 14 00 2563-99 G co CCGG 62.960 -999.990 N.. V4 2015 06 25 11 45 00 -14.2474 -170.5644 47.00 42.00 5.00 388097 SMO 2015 05 11 21 14 00 3452-99 G co CCGG 61.780 -999.990 N.. V4 2015 06 25 11 29 00 -14.2474 -170.5644 47.00 42.00 5.00 388098 SMO 2015 05 21 22 38 00 1699-99 S co CCGG 50.770 -999.990 ... V4 2015 07 09 13 14 00 -14.2474 -170.5644 60.30 42.00 18.30 388860 SMO 2015 05 21 22 38 00 3071-99 S co CCGG 50.820 -999.990 ... V4 2015 07 09 12 58 00 -14.2474 -170.5644 60.30 42.00 18.30 388861 SMO 2015 05 21 23 05 00 1773-99 G co CCGG 56.750 -999.990 N.. V4 2015 07 09 12 42 00 -14.2474 -170.5644 47.00 42.00 5.00 388859 SMO 2015 05 21 23 05 00 4415-99 G co CCGG 57.940 -999.990 N.. V4 2015 07 09 12 27 00 -14.2474 -170.5644 47.00 42.00 5.00 388858 SMO 2015 05 26 19 42 00 2300-99 S co CCGG 52.210 -999.990 ... V4 2015 07 10 11 06 00 -14.2474 -170.5644 60.30 42.00 18.30 388728 SMO 2015 05 26 19 42 00 5310-99 S co CCGG 51.840 -999.990 ... V4 2015 07 10 10 50 00 -14.2474 -170.5644 60.30 42.00 18.30 388727 SMO 2015 05 26 20 10 00 2389-99 G co CCGG 59.750 -999.990 N.. V4 2015 07 10 12 41 00 -14.2474 -170.5644 47.00 42.00 5.00 388725 SMO 2015 05 26 20 10 00 4761-99 G co CCGG 61.050 -999.990 N.. V4 2015 07 10 12 57 00 -14.2474 -170.5644 47.00 42.00 5.00 388726 SMO 2015 06 01 01 14 00 1021-99 G co CCGG 62.730 -999.990 N.. V4 2015 07 10 10 03 00 -14.2474 -170.5644 47.00 42.00 5.00 388722 SMO 2015 06 01 01 14 00 1421-99 G co CCGG 62.860 -999.990 N.. V4 2015 07 10 09 47 00 -14.2474 -170.5644 47.00 42.00 5.00 388721 SMO 2015 06 01 01 37 00 4929-99 S co CCGG 50.750 -999.990 ... V4 2015 07 10 10 34 00 -14.2474 -170.5644 60.30 42.00 18.30 388723 SMO 2015 06 01 01 37 00 5175-99 S co CCGG 50.150 -999.990 ... V4 2015 07 10 10 19 00 -14.2474 -170.5644 60.30 42.00 18.30 388724 SMO 2015 06 08 19 44 00 1900-99 S co CCGG 56.790 -999.990 ... V4 2015 07 16 14 40 00 -14.2474 -170.5644 60.30 42.00 18.30 389427 SMO 2015 06 08 19 44 00 4173-99 S co CCGG 56.320 -999.990 ... V4 2015 07 16 14 24 00 -14.2474 -170.5644 60.30 42.00 18.30 389428 SMO 2015 06 08 20 18 00 3582-99 G co CCGG 64.950 -999.990 N.. V4 2015 07 16 13 52 00 -14.2474 -170.5644 47.00 42.00 5.00 389429 SMO 2015 06 08 20 18 00 4425-99 G co CCGG 62.040 -999.990 N.. V4 2015 07 16 14 08 00 -14.2474 -170.5644 47.00 42.00 5.00 389430 SMO 2015 06 20 00 29 00 3969-99 G co CCGG 66.690 -999.990 N.. V4 2015 07 30 14 31 00 -14.2474 -170.5644 47.00 42.00 5.00 390168 SMO 2015 06 20 00 29 00 6565-66 G co CCGG 66.520 -999.990 N.. V4 2015 07 30 14 15 00 -14.2474 -170.5644 47.00 42.00 5.00 390169 SMO 2015 06 20 01 35 00 1383-99 S co CCGG 55.800 -999.990 ... V4 2015 07 30 13 59 00 -14.2474 -170.5644 60.30 42.00 18.30 390166 SMO 2015 06 20 01 35 00 3000-99 S co CCGG 55.520 -999.990 ... V4 2015 07 30 13 44 00 -14.2474 -170.5644 60.30 42.00 18.30 390167 SMO 2015 06 22 20 36 00 3871-99 S co CCGG 55.520 -999.990 ... V4 2015 07 28 14 39 00 -14.2474 -170.5644 60.30 42.00 18.30 390147 SMO 2015 06 22 20 36 00 6414-66 S co CCGG 55.800 -999.990 ... V4 2015 07 28 14 23 00 -14.2474 -170.5644 60.30 42.00 18.30 390146 SMO 2015 06 22 21 00 00 1808-99 G co CCGG 64.390 -999.990 N.. V4 2015 07 28 14 06 00 -14.2474 -170.5644 60.30 42.00 18.30 390149 SMO 2015 06 22 21 00 00 1976-99 G co CCGG 63.970 -999.990 N.. V4 2015 07 28 13 50 00 -14.2474 -170.5644 60.30 42.00 18.30 390148 SMO 2015 07 02 19 37 00 3710-99 S co CCGG 57.130 -999.990 ... V4 2015 08 06 15 28 00 -14.2474 -170.5644 60.30 42.00 18.30 390927 SMO 2015 07 02 19 37 00 4073-99 S co CCGG 55.920 -999.990 ... V4 2015 08 06 15 44 00 -14.2474 -170.5644 60.30 42.00 18.30 390928 SMO 2015 07 02 20 20 00 1585-99 G co CCGG 60.230 -999.990 N.. V4 2015 08 06 16 16 00 -14.2474 -170.5644 47.00 42.00 5.00 390929 SMO 2015 07 02 20 20 00 2037-99 G co CCGG 60.180 -999.990 N.. V4 2015 08 06 16 00 00 -14.2474 -170.5644 47.00 42.00 5.00 390930 SMO 2015 07 05 20 30 00 1293-99 G co CCGG 65.530 -999.990 N.. V4 2015 08 05 14 01 00 -14.2474 -170.5644 47.00 42.00 5.00 390918 SMO 2015 07 05 20 30 00 4296-99 G co CCGG 64.410 -999.990 N.. V4 2015 08 05 13 45 00 -14.2474 -170.5644 47.00 42.00 5.00 390917 SMO 2015 07 06 02 38 00 3562-99 S co CCGG 56.960 -999.990 ... V4 2015 08 05 14 32 00 -14.2474 -170.5644 60.30 42.00 18.30 390916 SMO 2015 07 06 02 38 00 6825-66 S co CCGG 56.490 -999.990 ... V4 2015 08 05 14 16 00 -14.2474 -170.5644 60.30 42.00 18.30 390915 SMO 2015 07 16 19 05 00 4015-99 G co CCGG 78.540 -999.990 N.. V4 2015 10 28 09 40 00 -14.2474 -170.5644 47.00 42.00 5.00 396427 SMO 2015 07 16 19 05 00 5150-99 G co CCGG 75.270 -999.990 N.. V4 2015 10 28 09 56 00 -14.2474 -170.5644 47.00 42.00 5.00 396428 SMO 2015 07 16 20 10 00 2589-99 S co CCGG 58.380 -999.990 ... V4 2015 10 28 10 12 00 -14.2474 -170.5644 60.30 42.00 18.30 396425 SMO 2015 07 16 20 10 00 4547-99 S co CCGG 56.770 -999.990 ... V4 2015 10 28 10 28 00 -14.2474 -170.5644 60.30 42.00 18.30 396426 SMO 2015 07 25 02 44 00 1656-99 G co CCGG 66.870 -999.990 N.. V4 2015 09 01 13 37 00 -14.2474 -170.5644 47.00 42.00 5.00 392533 SMO 2015 07 25 02 44 00 5189-99 G co CCGG 66.880 -999.990 N.. V4 2015 09 01 13 53 00 -14.2474 -170.5644 47.00 42.00 5.00 392530 SMO 2015 07 25 03 42 00 2498-99 S co CCGG 56.240 -999.990 ... V4 2015 09 01 13 21 00 -14.2474 -170.5644 60.30 42.00 18.30 392532 SMO 2015 07 25 03 42 00 327-99 S co CCGG 56.330 -999.990 ... V4 2015 09 01 13 05 00 -14.2474 -170.5644 60.30 42.00 18.30 392531 SMO 2015 07 31 23 35 00 2708-99 G co CCGG 105.250 -999.990 N.. V4 2015 09 09 16 46 00 -14.2474 -170.5644 47.00 42.00 5.00 393064 SMO 2015 07 31 23 35 00 4975-99 G co CCGG 94.280 -999.990 N.. V4 2015 09 09 17 02 00 -14.2474 -170.5644 47.00 42.00 5.00 393065 SMO 2015 08 01 00 20 00 1187-99 S co CCGG 60.260 -999.990 ... V4 2015 09 09 16 14 00 -14.2474 -170.5644 60.30 42.00 18.30 393062 SMO 2015 08 01 00 20 00 3424-99 S co CCGG 59.720 -999.990 ... V4 2015 09 09 16 30 00 -14.2474 -170.5644 60.30 42.00 18.30 393063 SMO 2015 08 07 22 42 00 2657-99 S co CCGG 59.590 -999.990 ... V4 2015 09 24 14 58 00 -14.2474 -170.5644 60.30 42.00 18.30 394111 SMO 2015 08 07 22 42 00 2914-99 S co CCGG 61.600 -999.990 ... V4 2015 09 24 15 14 00 -14.2474 -170.5644 60.30 42.00 18.30 394112 SMO 2015 08 14 22 41 00 3391-99 S co CCGG 63.200 -999.990 ... V4 2015 09 24 14 26 00 -14.2474 -170.5644 60.30 42.00 18.30 394110 SMO 2015 08 14 22 41 00 6383-66 S co CCGG 62.170 -999.990 ... V4 2015 09 24 14 42 00 -14.2474 -170.5644 60.30 42.00 18.30 394109 SMO 2015 08 21 02 27 00 1511-99 S co CCGG 59.350 -999.990 ... V4 2015 09 30 09 41 00 -14.2474 -170.5644 60.30 42.00 18.30 394710 SMO 2015 08 21 02 27 00 2490-99 S co CCGG 59.850 -999.990 ... V4 2015 09 30 09 57 00 -14.2474 -170.5644 60.30 42.00 18.30 394711 SMO 2015 08 29 02 43 00 1220-99 S co CCGG 63.690 -999.990 ... V4 2015 09 30 10 13 00 -14.2474 -170.5644 60.30 42.00 18.30 394712 SMO 2015 08 29 02 43 00 4606-99 S co CCGG 63.160 -999.990 ... V4 2015 09 30 10 29 00 -14.2474 -170.5644 60.30 42.00 18.30 394713 SMO 2015 09 05 01 34 00 2922-99 S co CCGG 65.760 -999.990 ... V4 2015 11 12 15 30 00 -14.2474 -170.5644 60.30 42.00 18.30 397398 SMO 2015 09 05 01 34 00 3709-99 S co CCGG 65.310 -999.990 ... V4 2015 11 12 15 46 00 -14.2474 -170.5644 60.30 42.00 18.30 397399 SMO 2015 09 12 01 18 00 3042-99 G co CCGG 65.910 -999.990 ... V4 2015 10 19 10 21 00 -14.2474 -170.5644 47.00 42.00 5.00 395597 SMO 2015 09 12 01 18 00 3654-99 G co CCGG 66.700 -999.990 ... V4 2015 10 19 10 37 00 -14.2474 -170.5644 47.00 42.00 5.00 395598 SMO 2015 09 18 23 17 00 1448-99 G co CCGG 66.010 -999.990 ... V4 2015 10 19 09 50 00 -14.2474 -170.5644 47.00 42.00 5.00 395595 SMO 2015 09 18 23 17 00 2199-99 G co CCGG 65.470 -999.990 ... V4 2015 10 19 10 05 00 -14.2474 -170.5644 47.00 42.00 5.00 395596 SMO 2015 09 26 00 16 00 1468-99 G co CCGG 63.700 -999.990 ... V4 2015 11 12 16 02 00 -14.2474 -170.5644 47.00 42.00 5.00 397397 SMO 2015 09 26 00 16 00 1759-99 G co CCGG 65.830 -999.990 ... V4 2015 11 12 16 17 00 -14.2474 -170.5644 47.00 42.00 5.00 397396 SMO 2015 09 26 00 44 00 1286-99 S co CCGG 79.960 -999.990 ... V4 2015 11 12 16 49 00 -14.2474 -170.5644 60.30 42.00 18.30 397400 SMO 2015 09 26 00 44 00 6098-66 S co CCGG 63.530 -999.990 ... V4 2015 11 12 16 33 00 -14.2474 -170.5644 60.30 42.00 18.30 397401 SMO 2015 10 02 21 23 00 1192-99 G co CCGG 71.760 -999.990 ... V4 2015 11 16 13 21 00 -14.2474 -170.5644 47.00 42.00 5.00 397613 SMO 2015 10 02 21 23 00 2674-99 G co CCGG 74.860 -999.990 N.. V4 2015 11 16 13 36 00 -14.2474 -170.5644 47.00 42.00 5.00 397614 SMO 2015 10 02 22 29 00 4414-99 S co CCGG 69.310 -999.990 ... V4 2015 11 13 09 45 00 -14.2474 -170.5644 60.30 42.00 18.30 397387 SMO 2015 10 02 22 29 00 535-99 S co CCGG 69.640 -999.990 ... V4 2015 11 13 09 30 00 -14.2474 -170.5644 60.30 42.00 18.30 397386 SMO 2015 10 09 21 44 00 1960-99 S co CCGG 66.010 -999.990 ... V4 2015 10 29 12 59 00 -14.2474 -170.5644 60.30 42.00 18.30 396549 SMO 2015 10 09 21 44 00 6780-66 S co CCGG 65.140 -999.990 ... V4 2015 10 29 13 14 00 -14.2474 -170.5644 60.30 42.00 18.30 396550 SMO 2015 10 09 22 00 00 3584-99 G co CCGG 67.050 -999.990 ... V4 2015 10 29 13 30 00 -14.2474 -170.5644 47.00 42.00 5.00 396551 SMO 2015 10 09 22 00 00 6197-66 G co CCGG 72.150 -999.990 A.. V4 2015 10 29 13 46 00 -14.2474 -170.5644 47.00 42.00 5.00 396552 SMO 2015 10 17 01 37 00 1118-99 G co CCGG 69.890 -999.990 ... V4 2015 11 12 11 32 00 -14.2474 -170.5644 47.00 42.00 5.00 397211 SMO 2015 10 17 01 37 00 621-99 G co CCGG 69.020 -999.990 ... V4 2015 11 12 11 16 00 -14.2474 -170.5644 47.00 42.00 5.00 397210 SMO 2015 10 17 02 36 00 1222-99 S co CCGG 67.520 -999.990 ... V4 2015 11 12 12 20 00 -14.2474 -170.5644 60.30 42.00 18.30 397212 SMO 2015 10 17 02 36 00 4513-99 S co CCGG 67.920 -999.990 ... V4 2015 11 12 12 35 00 -14.2474 -170.5644 60.30 42.00 18.30 397213 SMO 2015 10 24 19 42 00 1392-99 G co CCGG 74.350 -999.990 ... V4 2015 11 12 14 58 00 -14.2474 -170.5644 47.00 42.00 5.00 397394 SMO 2015 10 24 19 42 00 2892-99 G co CCGG 73.300 -999.990 ... V4 2015 11 12 15 14 00 -14.2474 -170.5644 47.00 42.00 5.00 397395 SMO 2015 10 24 23 38 00 4790-99 S co CCGG 72.200 -999.990 ... V4 2015 11 12 17 05 00 -14.2474 -170.5644 60.30 42.00 18.30 397392 SMO 2015 10 24 23 38 00 5084-99 S co CCGG 72.830 -999.990 ... V4 2015 11 12 17 21 00 -14.2474 -170.5644 60.30 42.00 18.30 397393 SMO 2015 10 31 00 48 00 3057-99 G co CCGG 76.610 -999.990 ... V4 2015 11 18 12 46 00 -14.2474 -170.5644 47.00 42.00 5.00 397732 SMO 2015 10 31 00 48 00 3500-99 G co CCGG 75.370 -999.990 ... V4 2015 11 18 13 02 00 -14.2474 -170.5644 47.00 42.00 5.00 397733 SMO 2015 10 31 02 35 00 1601-99 S co CCGG 71.120 -999.990 ... V4 2015 11 18 12 15 00 -14.2474 -170.5644 60.30 42.00 18.30 397730 SMO 2015 10 31 02 35 00 2034-99 S co CCGG 71.340 -999.990 ... V4 2015 11 18 12 31 00 -14.2474 -170.5644 60.30 42.00 18.30 397731 SMO 2015 11 07 05 15 00 1956-99 G co CCGG 68.570 -999.990 ... V4 2015 11 27 13 56 00 -14.2474 -170.5644 47.00 42.00 5.00 398137 SMO 2015 11 07 05 15 00 2513-99 G co CCGG 66.450 -999.990 ... V4 2015 11 27 14 12 00 -14.2474 -170.5644 47.00 42.00 5.00 398138 SMO 2015 11 07 06 38 00 2998-99 S co CCGG 66.050 -999.990 ... V4 2015 11 24 14 56 00 -14.2474 -170.5644 60.30 42.00 18.30 398139 SMO 2015 11 07 06 38 00 4891-99 S co CCGG 65.820 -999.990 ... V4 2015 11 24 14 40 00 -14.2474 -170.5644 60.30 42.00 18.30 398140 SMO 2015 11 14 00 32 00 2439-99 S co CCGG 66.420 -999.990 ... V4 2015 12 07 10 45 00 -14.2474 -170.5644 60.30 42.00 18.30 398547 SMO 2015 11 14 00 32 00 3661-99 S co CCGG 65.760 -999.990 ... V4 2015 12 07 11 01 00 -14.2474 -170.5644 60.30 42.00 18.30 398548 SMO 2015 11 14 00 43 00 2929-99 G co CCGG 68.820 -999.990 ... V4 2015 12 07 11 17 00 -14.2474 -170.5644 47.00 42.00 5.00 398546 SMO 2015 11 14 00 43 00 4202-99 G co CCGG 69.360 -999.990 ... V4 2015 12 07 11 33 00 -14.2474 -170.5644 47.00 42.00 5.00 398545 SMO 2015 11 19 19 55 00 1434-99 G co CCGG 105.870 -999.990 N.. V4 2015 12 18 10 11 00 -14.2474 -170.5644 47.00 42.00 5.00 398917 SMO 2015 11 19 19 55 00 3822-99 G co CCGG 72.570 -999.990 ... V4 2015 12 18 10 26 00 -14.2474 -170.5644 47.00 42.00 5.00 398918 SMO 2015 11 19 21 05 00 3620-99 S co CCGG 70.310 -999.990 ... V4 2015 12 18 10 42 00 -14.2474 -170.5644 60.30 42.00 18.30 398915 SMO 2015 11 19 21 05 00 4521-99 S co CCGG 71.590 -999.990 ... V4 2015 12 18 10 58 00 -14.2474 -170.5644 60.30 42.00 18.30 398916 SMO 2015 12 05 02 16 00 3041-99 G co CCGG 69.970 -999.990 ... V4 2016 01 04 09 41 00 -14.2474 -170.5644 47.00 42.00 5.00 399411 SMO 2015 12 05 02 16 00 3533-99 G co CCGG 68.550 -999.990 ... V4 2016 01 04 09 57 00 -14.2474 -170.5644 47.00 42.00 5.00 399412 SMO 2015 12 05 02 35 00 1751-99 S co CCGG 66.330 -999.990 ... V4 2016 01 04 10 13 00 -14.2474 -170.5644 60.30 42.00 18.30 399409 SMO 2015 12 05 02 35 00 3030-99 S co CCGG 66.700 -999.990 ... V4 2016 01 04 10 29 00 -14.2474 -170.5644 60.30 42.00 18.30 399410 SMO 2015 12 11 22 07 00 5355-99 G co CCGG 62.150 -999.990 ... V4 2016 01 08 11 59 00 -14.2474 -170.5644 47.00 42.00 5.00 399849 SMO 2015 12 11 22 07 00 756-99 G co CCGG 62.750 -999.990 ... V4 2016 01 08 11 43 00 -14.2474 -170.5644 47.00 42.00 5.00 399848 SMO 2015 12 11 22 44 00 2171-99 S co CCGG 59.830 -999.990 ... V4 2016 01 08 12 15 00 -14.2474 -170.5644 60.30 42.00 18.30 399846 SMO 2015 12 11 22 44 00 2732-99 S co CCGG 60.390 -999.990 ... V4 2016 01 08 12 31 00 -14.2474 -170.5644 60.30 42.00 18.30 399847 SMO 2015 12 18 00 04 00 3161-99 G co CCGG 62.600 -999.990 ... V4 2016 01 15 10 22 00 -14.2474 -170.5644 47.00 42.00 5.00 400103 SMO 2015 12 18 00 04 00 3324-99 G co CCGG 60.470 -999.990 ... V4 2016 01 15 10 38 00 -14.2474 -170.5644 47.00 42.00 5.00 400104 SMO 2015 12 18 02 35 00 3320-99 S co CCGG 60.070 -999.990 ... V4 2016 01 15 11 57 00 -14.2474 -170.5644 60.30 42.00 18.30 400101 SMO 2015 12 18 02 35 00 3348-99 S co CCGG 60.960 -999.990 ... V4 2016 01 15 12 12 00 -14.2474 -170.5644 60.30 42.00 18.30 400102 SMO 2015 12 23 00 42 00 1257-99 S co CCGG 62.190 -999.990 ... V4 2016 01 26 14 13 00 -14.2474 -170.5644 60.30 42.00 18.30 400588 SMO 2015 12 23 00 42 00 3877-99 S co CCGG 62.850 -999.990 ... V4 2016 01 26 14 29 00 -14.2474 -170.5644 60.30 42.00 18.30 400589 SMO 2015 12 23 01 28 00 110-99 G co CCGG 62.750 -999.990 ... V4 2016 01 26 13 42 00 -14.2474 -170.5644 47.00 42.00 5.00 400586 SMO 2015 12 23 01 28 00 2151-99 G co CCGG 61.700 -999.990 ... V4 2016 01 26 13 58 00 -14.2474 -170.5644 47.00 42.00 5.00 400587 SMO 2016 01 01 00 10 00 4597-99 G co CCGG 69.930 -999.990 ... V4 2016 01 28 10 18 00 -14.2474 -170.5644 47.00 42.00 5.00 401010 SMO 2016 01 01 00 10 00 5296-99 G co CCGG 69.150 -999.990 ... V4 2016 01 28 10 34 00 -14.2474 -170.5644 47.00 42.00 5.00 401011 SMO 2016 01 01 01 40 00 1857-99 S co CCGG 67.510 -999.990 ... V4 2016 01 28 09 46 00 -14.2474 -170.5644 60.30 42.00 18.30 401008 SMO 2016 01 01 01 40 00 1891-99 S co CCGG 67.470 -999.990 ... V4 2016 01 28 10 02 00 -14.2474 -170.5644 60.30 42.00 18.30 401009 SMO 2016 01 09 00 35 00 2834-99 G co CCGG 61.580 -999.990 ... V4 2016 01 29 10 37 00 -14.2474 -170.5644 47.00 42.00 5.00 401070 SMO 2016 01 09 00 35 00 4669-99 G co CCGG 60.160 -999.990 ... V4 2016 01 29 10 53 00 -14.2474 -170.5644 47.00 42.00 5.00 401071 SMO 2016 01 09 01 38 00 215-99 S co CCGG 60.970 -999.990 ... V4 2016 01 29 10 05 00 -14.2474 -170.5644 60.30 42.00 18.30 401068 SMO 2016 01 09 01 38 00 3315-99 S co CCGG 61.480 -999.990 ... V4 2016 01 29 10 21 00 -14.2474 -170.5644 60.30 42.00 18.30 401069 SMO 2016 01 16 01 16 00 1467-99 G co CCGG 71.320 -999.990 ... V4 2016 02 16 13 44 00 -14.2474 -170.5644 47.00 42.00 5.00 401999 SMO 2016 01 16 01 16 00 3557-99 G co CCGG 69.940 -999.990 ... V4 2016 02 16 14 00 00 -14.2474 -170.5644 47.00 42.00 5.00 402000 SMO 2016 01 16 01 38 00 1021-99 S co CCGG 68.270 -999.990 ... V4 2016 02 16 14 16 00 -14.2474 -170.5644 60.30 42.00 18.30 402001 SMO 2016 01 16 01 38 00 2174-99 S co CCGG 68.660 -999.990 ... V4 2016 02 16 14 32 00 -14.2474 -170.5644 60.30 42.00 18.30 402002 SMO 2016 01 23 00 20 00 1424-99 G co CCGG 58.970 -999.990 ... V4 2016 02 12 13 13 00 -14.2474 -170.5644 47.00 42.00 5.00 402003 SMO 2016 01 23 00 20 00 2495-99 G co CCGG 60.650 -999.990 ... V4 2016 02 12 12 57 00 -14.2474 -170.5644 47.00 42.00 5.00 402004 SMO 2016 01 23 00 38 00 3768-99 S co CCGG 59.510 -999.990 ... V4 2016 02 12 12 26 00 -14.2474 -170.5644 60.30 42.00 18.30 402005 SMO 2016 01 23 00 38 00 4330-99 S co CCGG 57.390 -999.990 ... V4 2016 02 12 12 41 00 -14.2474 -170.5644 60.30 42.00 18.30 402006 SMO 2016 01 30 00 42 00 1398-99 S co CCGG 49.640 -999.990 ... V4 2016 02 22 12 26 00 -14.2474 -170.5644 60.30 42.00 18.30 402305 SMO 2016 01 30 00 42 00 2509-99 S co CCGG 49.230 -999.990 ... V4 2016 02 22 12 42 00 -14.2474 -170.5644 60.30 42.00 18.30 402306 SMO 2016 01 30 01 03 00 3489-99 G co CCGG 51.450 -999.990 ... V4 2016 02 19 16 18 00 -14.2474 -170.5644 47.00 42.00 5.00 402307 SMO 2016 01 30 01 03 00 4489-99 G co CCGG 50.780 -999.990 ... V4 2016 02 19 16 34 00 -14.2474 -170.5644 47.00 42.00 5.00 402308 SMO 2016 02 05 05 09 00 2390-99 G co CCGG 54.020 -999.990 ... V4 2016 03 01 17 39 00 -14.2474 -170.5644 47.00 42.00 5.00 402742 SMO 2016 02 05 05 09 00 663-99 G co CCGG 53.560 -999.990 ... V4 2016 03 01 17 23 00 -14.2474 -170.5644 47.00 42.00 5.00 402743 SMO 2016 02 05 05 43 00 3366-99 S co CCGG 53.900 -999.990 ... V4 2016 03 02 09 59 00 -14.2474 -170.5644 60.30 42.00 18.30 402740 SMO 2016 02 05 05 43 00 4912-99 S co CCGG 53.140 -999.990 ... V4 2016 03 02 10 15 00 -14.2474 -170.5644 60.30 42.00 18.30 402741 SMO 2016 02 12 22 40 00 4040-99 S co CCGG 59.140 -999.990 ... V4 2016 03 09 16 31 00 -14.2474 -170.5644 60.30 42.00 18.30 403259 SMO 2016 02 12 22 40 00 5312-99 S co CCGG 60.130 -999.990 ... V4 2016 03 09 16 46 00 -14.2474 -170.5644 60.30 42.00 18.30 403258 SMO 2016 02 12 23 03 00 2147-99 G co CCGG 63.630 -999.990 ... V4 2016 03 10 08 54 00 -14.2474 -170.5644 47.00 42.00 5.00 403256 SMO 2016 02 12 23 03 00 3681-99 G co CCGG 62.720 -999.990 ... V4 2016 03 10 09 10 00 -14.2474 -170.5644 47.00 42.00 5.00 403257 SMO 2016 02 19 22 43 00 2578-99 S co CCGG 67.030 -999.990 ... V4 2016 03 10 15 31 00 -14.2474 -170.5644 60.30 42.00 18.30 403371 SMO 2016 02 19 22 43 00 974-99 S co CCGG 67.360 -999.990 ... V4 2016 03 10 15 16 00 -14.2474 -170.5644 60.30 42.00 18.30 403372 SMO 2016 02 19 22 54 00 1310-99 G co CCGG 74.510 -999.990 .X. V4 2016 03 11 09 23 00 -14.2474 -170.5644 47.00 42.00 5.00 403370 SMO 2016 02 19 22 54 00 1569-99 G co CCGG 75.260 -999.990 .X. V4 2016 03 11 09 39 00 -14.2474 -170.5644 47.00 42.00 5.00 403369 SMO 2016 02 23 01 33 00 464-99 G co CCGG 51.330 -999.990 ... V4 2016 04 13 14 43 00 -14.2474 -170.5644 47.00 42.00 5.00 404807 SMO 2016 02 23 03 14 00 3336-99 S co CCGG 49.540 -999.990 ... V4 2016 04 08 15 30 00 -14.2474 -170.5644 60.30 42.00 18.30 404840 SMO 2016 02 23 03 14 00 545-99 S co CCGG 50.010 -999.990 ... V4 2016 04 08 15 15 00 -14.2474 -170.5644 60.30 42.00 18.30 404841 SMO 2016 03 05 01 04 00 2601-99 G co CCGG 53.060 -999.990 ... V4 2016 04 12 12 25 00 -14.2474 -170.5644 47.00 42.00 5.00 404810 SMO 2016 03 05 01 04 00 320-99 G co CCGG 52.090 -999.990 ... V4 2016 04 12 12 09 00 -14.2474 -170.5644 47.00 42.00 5.00 404811 SMO 2016 03 05 02 39 00 1557-99 S co CCGG 49.330 -999.990 ... V4 2016 04 12 10 50 00 -14.2474 -170.5644 60.30 42.00 18.30 404809 SMO 2016 03 05 02 39 00 2461-99 S co CCGG 49.840 -999.990 ... V4 2016 04 12 10 35 00 -14.2474 -170.5644 60.30 42.00 18.30 404808 SMO 2016 03 11 23 25 00 1518-99 G co CCGG 73.150 -999.990 .X. V4 2016 04 11 11 38 00 -14.2474 -170.5644 47.00 42.00 5.00 404802 SMO 2016 03 11 23 25 00 406-99 G co CCGG 73.050 -999.990 .X. V4 2016 04 11 11 22 00 -14.2474 -170.5644 47.00 42.00 5.00 404801 SMO 2016 03 12 00 36 00 1939-99 S co CCGG 72.140 -999.990 .X. V4 2016 04 11 10 51 00 -14.2474 -170.5644 60.30 42.00 18.30 404799 SMO 2016 03 12 00 36 00 4696-99 S co CCGG 69.930 -999.990 .X. V4 2016 04 11 11 06 00 -14.2474 -170.5644 60.30 42.00 18.30 404800 SMO 2016 03 17 22 00 00 2790-99 G co CCGG 63.480 -999.990 ... V4 2016 04 18 16 12 00 -14.2474 -170.5644 47.00 42.00 5.00 405375 SMO 2016 03 17 22 00 00 3343-99 G co CCGG 66.000 -999.990 ... V4 2016 04 18 16 28 00 -14.2474 -170.5644 47.00 42.00 5.00 405376 SMO 2016 03 17 23 40 00 4967-99 S co CCGG 63.530 -999.990 ... V4 2016 04 18 15 41 00 -14.2474 -170.5644 60.30 42.00 18.30 405373 SMO 2016 03 17 23 40 00 5185-99 S co CCGG 62.740 -999.990 ... V4 2016 04 18 15 57 00 -14.2474 -170.5644 60.30 42.00 18.30 405374 SMO 2016 03 26 00 30 00 4053-99 G co CCGG 63.590 -999.990 ... V4 2016 04 19 09 56 00 -14.2474 -170.5644 47.00 42.00 5.00 405360 SMO 2016 03 26 00 30 00 5300-99 G co CCGG 63.420 -999.990 ... V4 2016 04 19 10 12 00 -14.2474 -170.5644 47.00 42.00 5.00 405359 SMO 2016 03 26 01 42 00 4237-99 S co CCGG 59.880 -999.990 ... V4 2016 04 18 17 16 00 -14.2474 -170.5644 60.30 42.00 18.30 405357 SMO 2016 03 26 01 42 00 4780-99 S co CCGG 59.750 -999.990 ... V4 2016 04 18 17 32 00 -14.2474 -170.5644 60.30 42.00 18.30 405358 SMO 2016 04 01 22 05 00 3799-99 G co CCGG 59.430 -999.990 ... V4 2016 04 27 14 34 00 -14.2474 -170.5644 47.00 42.00 5.00 405771 SMO 2016 04 01 22 05 00 3940-99 G co CCGG 58.780 -999.990 ... V4 2016 04 27 14 50 00 -14.2474 -170.5644 47.00 42.00 5.00 405772 SMO 2016 04 01 23 40 00 2256-99 S co CCGG 55.720 -999.990 ... V4 2016 04 27 15 07 00 -14.2474 -170.5644 60.30 42.00 18.30 405773 SMO 2016 04 01 23 40 00 4580-99 S co CCGG 55.920 -999.990 ... V4 2016 04 27 15 22 00 -14.2474 -170.5644 60.30 42.00 18.30 405774 SMO 2016 04 07 22 40 00 2268-99 G co CCGG 71.600 -999.990 .X. V4 2016 04 27 13 31 00 -14.2474 -170.5644 47.00 42.00 5.00 405769 SMO 2016 04 07 22 40 00 2755-99 G co CCGG 72.860 -999.990 .X. V4 2016 04 27 13 47 00 -14.2474 -170.5644 47.00 42.00 5.00 405770 SMO 2016 04 07 23 40 00 2614-99 S co CCGG 69.820 -999.990 ... V4 2016 04 27 14 02 00 -14.2474 -170.5644 60.30 42.00 18.30 405767 SMO 2016 04 07 23 40 00 3182-99 S co CCGG 68.170 -999.990 ... V4 2016 04 27 14 18 00 -14.2474 -170.5644 60.30 42.00 18.30 405768 SMO 2016 04 14 18 45 00 3424-99 S co CCGG 53.130 -999.990 ... V4 2016 05 06 13 06 00 -14.2474 -170.5644 60.30 42.00 18.30 406435 SMO 2016 04 14 18 45 00 3786-99 S co CCGG 54.630 -999.990 ... V4 2016 05 06 13 22 00 -14.2474 -170.5644 60.30 42.00 18.30 406436 SMO 2016 04 14 23 45 00 3058-99 G co CCGG 53.760 -999.990 ... V4 2016 05 06 13 54 00 -14.2474 -170.5644 47.00 42.00 5.00 406437 SMO 2016 04 14 23 45 00 75-99 G co CCGG 53.750 -999.990 ... V4 2016 05 06 13 38 00 -14.2474 -170.5644 47.00 42.00 5.00 406438 SMO 2016 04 23 23 45 00 1315-99 G co CCGG 55.210 -999.990 ... V4 2016 05 26 17 35 00 -14.2474 -170.5644 47.00 42.00 5.00 407353 SMO 2016 04 23 23 45 00 802-99 G co CCGG 54.500 -999.990 ... V4 2016 05 26 17 19 00 -14.2474 -170.5644 47.00 42.00 5.00 407354 SMO 2016 04 24 00 40 00 1976-99 S co CCGG 55.770 -999.990 ... V4 2016 05 27 10 09 00 -14.2474 -170.5644 60.30 42.00 18.30 407351 SMO 2016 04 24 00 40 00 3337-99 S co CCGG 55.420 -999.990 ... V4 2016 05 27 10 24 00 -14.2474 -170.5644 60.30 42.00 18.30 407352 SMO 2016 04 29 19 55 00 77-99 G co CCGG 56.780 -999.990 ... V4 2016 05 31 13 33 00 -14.2474 -170.5644 47.00 42.00 5.00 407333 SMO 2016 04 29 21 35 00 4510-99 S co CCGG 55.400 -999.990 ... V4 2016 05 31 13 01 00 -14.2474 -170.5644 60.30 42.00 18.30 407331 SMO 2016 04 29 21 35 00 5318-99 S co CCGG 55.690 -999.990 ... V4 2016 05 31 13 17 00 -14.2474 -170.5644 60.30 42.00 18.30 407332 SMO 2016 05 10 23 20 00 2293-99 S co CCGG 54.090 -999.990 ... V4 2016 06 17 10 17 00 -14.2474 -170.5644 60.30 42.00 18.30 408366 SMO 2016 05 10 23 20 00 4808-99 S co CCGG 52.340 -999.990 ... V4 2016 06 17 10 33 00 -14.2474 -170.5644 60.30 42.00 18.30 408367 SMO 2016 05 11 00 09 00 1914-99 G co CCGG 54.700 -999.990 ... V4 2016 06 21 17 32 00 -14.2474 -170.5644 47.00 42.00 5.00 408342 SMO 2016 05 11 00 09 00 87-99 G co CCGG 55.010 -999.990 ... V4 2016 06 21 17 17 00 -14.2474 -170.5644 47.00 42.00 5.00 408343 SMO 2016 05 26 22 00 00 1726-99 G co CCGG 61.580 -999.990 ... V4 2016 06 23 09 40 00 -14.2474 -170.5644 47.00 42.00 5.00 408810 SMO 2016 05 26 22 00 00 2462-99 G co CCGG 60.500 -999.990 ... V4 2016 06 23 10 44 00 -14.2474 -170.5644 47.00 42.00 5.00 408811 SMO 2016 05 26 22 38 00 1247-99 S co CCGG 59.620 -999.990 ... V4 2016 06 23 09 56 00 -14.2474 -170.5644 60.30 42.00 18.30 408808 SMO 2016 05 26 22 38 00 3094-99 S co CCGG 59.190 -999.990 ... V4 2016 06 23 10 59 00 -14.2474 -170.5644 60.30 42.00 18.30 408809 SMO 2016 06 05 00 53 00 1599-99 G co CCGG 58.880 -999.990 ... V4 2016 07 19 15 27 00 -14.2474 -170.5644 47.00 42.00 5.00 410636 SMO 2016 06 05 00 53 00 4241-99 G co CCGG 58.150 -999.990 ... V4 2016 07 19 15 43 00 -14.2474 -170.5644 47.00 42.00 5.00 410637 SMO 2016 06 10 21 03 00 2955-99 G co CCGG 62.190 -999.990 ... V4 2016 07 05 17 21 00 -14.2474 -170.5644 47.00 42.00 5.00 409479 SMO 2016 06 10 21 03 00 889-99 G co CCGG 60.600 -999.990 ... V4 2016 07 05 17 05 00 -14.2474 -170.5644 47.00 42.00 5.00 409480 SMO 2016 06 10 22 39 00 1063-99 S co CCGG 59.550 -999.990 ... V4 2016 07 06 08 59 00 -14.2474 -170.5644 60.30 42.00 18.30 409477 SMO 2016 06 10 22 39 00 2182-99 S co CCGG 57.130 -999.990 ... V4 2016 07 06 09 15 00 -14.2474 -170.5644 60.30 42.00 18.30 409478 SMO 2016 06 16 23 10 00 4372-99 G co CCGG 57.840 -999.990 ... V4 2016 07 20 10 24 00 -14.2474 -170.5644 47.00 42.00 5.00 410630 SMO 2016 06 16 23 10 00 829-99 G co CCGG 57.420 -999.990 ... V4 2016 07 20 10 08 00 -14.2474 -170.5644 47.00 42.00 5.00 410631 SMO 2016 06 16 23 42 00 2020-99 S co CCGG 57.730 -999.990 ... V4 2016 07 20 10 56 00 -14.2474 -170.5644 60.30 42.00 18.30 410628 SMO 2016 06 16 23 42 00 817-99 S co CCGG 55.890 -999.990 ... V4 2016 07 20 10 40 00 -14.2474 -170.5644 60.30 42.00 18.30 410629 SMO 2016 06 27 05 30 00 1696-99 G co CCGG 56.910 -999.990 ... V4 2016 07 20 15 25 00 -14.2474 -170.5644 47.00 42.00 5.00 410614 SMO 2016 06 27 05 30 00 437-99 G co CCGG 57.470 -999.990 ... V4 2016 07 20 15 09 00 -14.2474 -170.5644 47.00 42.00 5.00 410615 SMO 2016 07 01 19 45 00 2365-99 G co CCGG 57.840 -999.990 ... V4 2016 07 20 15 41 00 -14.2474 -170.5644 47.00 42.00 5.00 410612 SMO 2016 07 01 19 45 00 4189-99 G co CCGG 58.180 -999.990 ... V4 2016 07 20 15 56 00 -14.2474 -170.5644 47.00 42.00 5.00 410613 SMO 2016 07 08 02 00 00 4425-99 G co CCGG 56.320 -999.990 ... V4 2016 07 27 10 38 00 -14.2474 -170.5644 47.00 42.00 5.00 411033 SMO 2016 07 08 02 00 00 4529-99 G co CCGG 56.760 -999.990 ... V4 2016 07 27 10 54 00 -14.2474 -170.5644 47.00 42.00 5.00 411034 SMO 2016 07 08 03 38 00 283-99 S co CCGG 57.210 -999.990 ... V4 2016 07 27 11 26 00 -14.2474 -170.5644 60.30 42.00 18.30 411036 SMO 2016 07 08 03 38 00 648-99 S co CCGG 56.640 -999.990 ... V4 2016 07 27 11 10 00 -14.2474 -170.5644 60.30 42.00 18.30 411035 SMO 2016 07 16 23 28 00 4612-99 G co CCGG 63.510 -999.990 ... V4 2016 08 02 16 12 00 -14.2474 -170.5644 47.00 42.00 5.00 411356 SMO 2016 07 16 23 28 00 4877-99 G co CCGG 62.350 -999.990 ... V4 2016 08 02 16 28 00 -14.2474 -170.5644 47.00 42.00 5.00 411357 SMO 2016 07 20 01 59 00 1592-99 G co CCGG 57.240 -999.990 ... V4 2016 08 02 12 31 00 -14.2474 -170.5644 47.00 42.00 5.00 411360 SMO 2016 07 20 01 59 00 5347-99 G co CCGG 67.480 -999.990 N.. V4 2016 08 02 12 46 00 -14.2474 -170.5644 47.00 42.00 5.00 411361 SMO 2016 07 26 22 43 00 2439-99 S co CCGG 64.790 -999.990 ... V4 2016 08 17 16 05 00 -14.2474 -170.5644 60.30 42.00 18.30 412414 SMO 2016 07 26 22 43 00 423-99 S co CCGG 63.570 -999.990 ... V4 2016 08 17 15 49 00 -14.2474 -170.5644 60.30 42.00 18.30 412413 SMO 2016 07 26 23 05 00 151-99 G co CCGG 59.250 -999.990 ... V4 2016 08 17 16 21 00 -14.2474 -170.5644 47.00 42.00 5.00 412415 SMO 2016 07 26 23 05 00 387-99 G co CCGG 58.560 -999.990 ... V4 2016 08 17 16 37 00 -14.2474 -170.5644 47.00 42.00 5.00 412416 SMO 2016 08 05 23 39 00 237-99 S co CCGG 60.440 -999.990 ... V4 2016 08 22 15 09 00 -14.2474 -170.5644 60.30 42.00 18.30 412604 SMO 2016 08 05 23 39 00 3554-99 S co CCGG 60.310 -999.990 ... V4 2016 08 22 15 25 00 -14.2474 -170.5644 60.30 42.00 18.30 412605 SMO 2016 08 06 00 26 00 3257-99 G co CCGG 56.030 -999.990 ... V4 2016 08 22 12 30 00 -14.2474 -170.5644 47.00 42.00 5.00 412618 SMO 2016 08 06 00 26 00 5377-99 G co CCGG 59.800 -999.990 ... V4 2016 08 22 12 45 00 -14.2474 -170.5644 47.00 42.00 5.00 412619 SMO 2016 08 09 00 36 00 3572-99 S co CCGG 57.590 -999.990 ... V4 2016 08 22 15 56 00 -14.2474 -170.5644 60.30 42.00 18.30 412607 SMO 2016 08 09 00 36 00 767-99 S co CCGG 56.390 -999.990 ... V4 2016 08 22 15 41 00 -14.2474 -170.5644 60.30 42.00 18.30 412606 SMO 2016 08 09 01 25 00 1069-99 G co CCGG 59.160 -999.990 ... V4 2016 08 22 16 12 00 -14.2474 -170.5644 47.00 42.00 5.00 412608 SMO 2016 08 09 01 25 00 4135-99 G co CCGG 59.340 -999.990 ... V4 2016 08 22 16 28 00 -14.2474 -170.5644 47.00 42.00 5.00 412609 SMO 2016 08 20 02 38 00 2613-99 S co CCGG 56.270 -999.990 ... V4 2016 09 28 12 36 00 -14.2474 -170.5644 60.30 42.00 18.30 414045 SMO 2016 08 20 02 38 00 652-99 S co CCGG 55.690 -999.990 ... V4 2016 09 28 12 20 00 -14.2474 -170.5644 60.30 42.00 18.30 414046 SMO 2016 08 20 04 08 00 3119-99 G co CCGG 55.840 -999.990 ... V4 2016 09 28 11 49 00 -14.2474 -170.5644 47.00 42.00 5.00 414043 SMO 2016 08 20 04 08 00 4684-99 G co CCGG 55.450 -999.990 ... V4 2016 09 28 12 04 00 -14.2474 -170.5644 47.00 42.00 5.00 414044 SMO 2016 08 26 23 35 00 5579-99 S co CCGG 62.110 -999.990 ... V4 2016 09 30 12 55 00 -14.2474 -170.5644 60.30 42.00 18.30 414190 SMO 2016 08 26 23 35 00 5661-99 S co CCGG 62.800 -999.990 ... V4 2016 09 30 13 11 00 -14.2474 -170.5644 60.30 42.00 18.30 414191 SMO 2016 08 27 01 22 00 302-99 G co CCGG 69.460 -999.990 N.. V4 2016 09 30 13 27 00 -14.2474 -170.5644 47.00 42.00 5.00 414189 SMO 2016 08 27 01 22 00 4715-99 G co CCGG 63.840 -999.990 ... V4 2016 09 30 13 43 00 -14.2474 -170.5644 47.00 42.00 5.00 414188 SMO 2016 09 04 08 35 00 5466-99 S co CCGG 59.360 -999.990 ... V4 2016 10 18 09 09 00 -14.2474 -170.5644 60.30 42.00 18.30 415170 SMO 2016 09 04 08 35 00 5673-99 S co CCGG 61.060 -999.990 ... V4 2016 10 18 09 25 00 -14.2474 -170.5644 60.30 42.00 18.30 415171 SMO 2016 09 04 12 34 56 1037-99 G co CCGG 64.270 -999.990 ... V4 2016 10 18 09 41 00 -14.2474 -170.5644 47.00 42.00 5.00 415168 SMO 2016 09 04 12 34 56 5462-99 G co CCGG 62.130 -999.990 ... V4 2016 10 18 09 57 00 -14.2474 -170.5644 47.00 42.00 5.00 415169 SMO 2016 09 07 01 35 00 1409-99 S co CCGG 57.820 -999.990 ... V4 2016 09 30 13 58 00 -14.2474 -170.5644 60.30 42.00 18.30 414194 SMO 2016 09 07 01 35 00 2036-99 S co CCGG 57.920 -999.990 ... V4 2016 09 30 14 14 00 -14.2474 -170.5644 60.30 42.00 18.30 414195 SMO 2016 09 07 02 40 00 2145-99 G co CCGG 59.180 -999.990 ... V4 2016 09 30 14 46 00 -14.2474 -170.5644 47.00 42.00 5.00 414193 SMO 2016 09 07 02 40 00 429-99 G co CCGG 58.830 -999.990 ... V4 2016 09 30 14 30 00 -14.2474 -170.5644 47.00 42.00 5.00 414192 SMO 2016 09 13 00 05 00 5316-99 G co CCGG 60.860 -999.990 ... V4 2016 10 06 11 08 00 -14.2474 -170.5644 47.00 42.00 5.00 414646 SMO 2016 09 13 00 05 00 5577-99 G co CCGG 60.200 -999.990 ... V4 2016 10 06 11 24 00 -14.2474 -170.5644 47.00 42.00 5.00 414647 SMO 2016 09 13 02 13 00 5489-99 S co CCGG 57.960 -999.990 ... V4 2016 10 06 11 40 00 -14.2474 -170.5644 60.30 42.00 18.30 414648 SMO 2016 09 13 02 13 00 5498-99 S co CCGG 57.410 -999.990 ... V4 2016 10 06 11 56 00 -14.2474 -170.5644 60.30 42.00 18.30 414649 SMO 2016 09 19 21 40 00 4758-99 S co CCGG 66.440 -999.990 ... V4 2016 10 11 16 59 00 -14.2474 -170.5644 60.30 42.00 18.30 414950 SMO 2016 09 19 21 40 00 4758-99 S co CCGG 67.010 -999.990 ... V4 2016 10 12 09 24 00 -14.2474 -170.5644 60.30 42.00 18.30 414950 SMO 2016 09 19 21 40 00 5596-99 S co CCGG 89.710 -999.990 N.. V4 2016 10 11 17 15 00 -14.2474 -170.5644 60.30 42.00 18.30 414951 SMO 2016 09 19 21 40 00 5596-99 S co CCGG 66.120 -999.990 ... V4 2016 10 12 09 40 00 -14.2474 -170.5644 60.30 42.00 18.30 414951 SMO 2016 09 19 23 29 00 4972-99 G co CCGG 68.980 -999.990 ... V4 2016 10 14 09 09 00 -14.2474 -170.5644 47.00 42.00 5.00 414948 SMO 2016 09 19 23 29 00 5505-99 G co CCGG 67.960 -999.990 ... V4 2016 10 14 09 24 00 -14.2474 -170.5644 47.00 42.00 5.00 414949 SMO 2016 09 27 03 35 00 2348-99 S co CCGG 60.760 -999.990 ... V4 2016 10 17 16 05 00 -14.2474 -170.5644 60.30 42.00 18.30 415173 SMO 2016 09 27 03 35 00 4233-99 S co CCGG 61.070 -999.990 ... V4 2016 10 17 15 49 00 -14.2474 -170.5644 60.30 42.00 18.30 415172 SMO 2016 09 27 04 19 00 4447-99 G co CCGG 60.980 -999.990 ... V4 2016 10 17 15 33 00 -14.2474 -170.5644 47.00 42.00 5.00 415174 SMO 2016 09 27 04 19 00 4817-99 G co CCGG 61.730 -999.990 ... V4 2016 10 17 15 17 00 -14.2474 -170.5644 47.00 42.00 5.00 415175 SMO 2016 10 03 21 42 00 1533-99 S co CCGG 64.630 -999.990 ... V4 2016 10 26 15 42 00 -14.2474 -170.5644 60.30 42.00 18.30 415480 SMO 2016 10 03 21 42 00 350-99 S co CCGG 64.860 -999.990 ... V4 2016 10 26 15 58 00 -14.2474 -170.5644 60.30 42.00 18.30 415481 SMO 2016 10 03 22 24 00 5529-99 G co CCGG 66.090 -999.990 ... V4 2016 10 26 15 27 00 -14.2474 -170.5644 47.00 42.00 5.00 415478 SMO 2016 10 03 22 24 00 5599-99 G co CCGG 69.460 -999.990 ... V4 2016 10 26 15 11 00 -14.2474 -170.5644 47.00 42.00 5.00 415479 SMO 2016 10 11 19 41 00 239-99 S co CCGG 63.910 -999.990 ... V4 2016 11 02 13 41 00 -14.2474 -170.5644 60.30 42.00 18.30 415928 SMO 2016 10 11 19 41 00 4601-99 S co CCGG 63.500 -999.990 ... V4 2016 11 02 13 57 00 -14.2474 -170.5644 60.30 42.00 18.30 415929 SMO 2016 10 12 00 05 00 4517-99 G co CCGG 65.990 -999.990 ... V4 2016 11 02 13 25 00 -14.2474 -170.5644 47.00 42.00 5.00 415930 SMO 2016 10 12 00 05 00 5197-99 G co CCGG 65.550 -999.990 ... V4 2016 11 02 13 10 00 -14.2474 -170.5644 47.00 42.00 5.00 415931 SMO 2016 10 17 19 27 00 1711-99 S co CCGG 61.280 -999.990 ... V4 2016 11 10 14 04 00 -14.2474 -170.5644 60.30 42.00 18.30 416294 SMO 2016 10 17 19 27 00 4950-99 S co CCGG 60.600 -999.990 ... V4 2016 11 10 14 19 00 -14.2474 -170.5644 60.30 42.00 18.30 416295 SMO 2016 10 17 22 58 00 4780-99 G co CCGG 61.530 -999.990 ... V4 2016 11 10 13 48 00 -14.2474 -170.5644 47.00 42.00 5.00 416296 SMO 2016 10 17 22 58 00 5039-99 G co CCGG 61.280 -999.990 ... V4 2016 11 10 13 32 00 -14.2474 -170.5644 47.00 42.00 5.00 416297 SMO 2016 10 24 12 35 00 3203-99 S co CCGG 55.760 -999.990 ... V4 2016 11 15 14 56 00 -14.2474 -170.5644 60.30 42.00 18.30 416579 SMO 2016 10 24 12 35 00 4765-99 S co CCGG 55.640 -999.990 ... V4 2016 11 15 15 12 00 -14.2474 -170.5644 60.30 42.00 18.30 416580 SMO 2016 10 25 01 17 00 1945-99 G co CCGG 57.010 -999.990 ... V4 2016 11 14 17 04 00 -14.2474 -170.5644 47.00 42.00 5.00 416581 SMO 2016 10 25 01 17 00 738-99 G co CCGG 57.330 -999.990 ... V4 2016 11 14 16 48 00 -14.2474 -170.5644 47.00 42.00 5.00 416582 SMO 2016 11 02 00 50 00 259-99 S co CCGG 60.060 -999.990 ... V4 2016 11 21 13 55 00 -14.2474 -170.5644 60.30 42.00 18.30 416969 SMO 2016 11 02 00 50 00 3513-99 S co CCGG 59.810 -999.990 ... V4 2016 11 21 14 11 00 -14.2474 -170.5644 60.30 42.00 18.30 416970 SMO 2016 11 02 03 37 00 3359-99 G co CCGG 61.600 -999.990 ... V4 2016 11 21 13 23 00 -14.2474 -170.5644 47.00 42.00 5.00 416967 SMO 2016 11 02 03 37 00 3489-99 G co CCGG 59.970 -999.990 ... V4 2016 11 21 13 39 00 -14.2474 -170.5644 47.00 42.00 5.00 416968 SMO 2016 11 16 22 39 00 3169-99 S co CCGG 62.440 -999.990 ... V4 2017 01 09 10 36 00 -14.2474 -170.5644 60.30 42.00 18.30 418792 SMO 2016 11 16 22 39 00 4823-99 S co CCGG 61.910 -999.990 ... V4 2017 01 09 10 52 00 -14.2474 -170.5644 60.30 42.00 18.30 418793 SMO 2016 11 16 23 45 00 4200-99 G co CCGG 64.650 -999.990 ... V4 2017 01 09 10 04 00 -14.2474 -170.5644 47.00 42.00 5.00 418794 SMO 2016 11 16 23 45 00 5022-99 G co CCGG 63.870 -999.990 ... V4 2017 01 09 10 20 00 -14.2474 -170.5644 47.00 42.00 5.00 418795 SMO 2016 11 22 22 35 00 5550-99 S co CCGG 56.820 -999.990 ... V4 2016 12 14 08 57 00 -14.2474 -170.5644 60.30 42.00 18.30 418093 SMO 2016 11 22 22 35 00 5649-99 S co CCGG 57.010 -999.990 ... V4 2016 12 14 09 13 00 -14.2474 -170.5644 60.30 42.00 18.30 418094 SMO 2016 11 23 00 18 00 3427-99 G co CCGG 59.510 -999.990 ... V4 2016 12 14 08 41 00 -14.2474 -170.5644 47.00 42.00 5.00 418092 SMO 2016 11 23 00 18 00 5549-99 G co CCGG 58.880 -999.990 ... V4 2016 12 14 08 25 00 -14.2474 -170.5644 47.00 42.00 5.00 418091 SMO 2016 11 29 22 35 00 4873-99 S co CCGG 57.140 -999.990 ... V4 2016 12 13 16 57 00 -14.2474 -170.5644 60.30 42.00 18.30 418090 SMO 2016 11 29 22 35 00 968-99 S co CCGG 56.030 -999.990 ... V4 2016 12 13 16 42 00 -14.2474 -170.5644 60.30 42.00 18.30 418089 SMO 2016 11 30 00 45 00 2828-99 G co CCGG 58.140 -999.990 ... V4 2016 12 13 16 26 00 -14.2474 -170.5644 47.00 42.00 5.00 418088 SMO 2016 11 30 00 45 00 922-99 G co CCGG 58.750 -999.990 ... V4 2016 12 13 16 10 00 -14.2474 -170.5644 47.00 42.00 5.00 418087 SMO 2016 12 17 01 42 00 1756-99 S co CCGG 49.660 -999.990 -.. V4 2017 01 13 09 41 00 -14.2474 -170.5644 60.30 42.00 18.30 418947 SMO 2016 12 17 01 42 00 2312-99 S co CCGG 58.140 -999.990 +.. V4 2017 01 13 09 25 00 -14.2474 -170.5644 60.30 42.00 18.30 418946 SMO 2016 12 17 02 05 00 5703-99 G co CCGG 56.530 -999.990 ... V4 2017 01 17 11 11 00 -14.2474 -170.5644 47.00 42.00 5.00 419047 SMO 2016 12 17 02 05 00 640-99 G co CCGG 56.100 -999.990 ... V4 2017 01 17 11 27 00 -14.2474 -170.5644 47.00 42.00 5.00 419048 SMO 2016 12 21 02 50 00 224-99 S co CCGG 57.570 -999.990 ... V4 2017 01 26 15 50 00 -14.2474 -170.5644 60.30 42.00 18.30 419627 SMO 2016 12 21 02 50 00 3108-99 S co CCGG 56.550 -999.990 ... V4 2017 01 26 16 05 00 -14.2474 -170.5644 60.30 42.00 18.30 419628 SMO 2016 12 21 04 00 00 4432-99 G co CCGG 56.130 -999.990 ... V4 2017 01 26 16 21 00 -14.2474 -170.5644 47.00 42.00 5.00 419625 SMO 2016 12 21 04 00 00 5194-99 G co CCGG 56.240 -999.990 ... V4 2017 01 26 16 37 00 -14.2474 -170.5644 47.00 42.00 5.00 419626 SMO 2016 12 29 00 55 00 1251-99 G co CCGG 59.120 -999.990 ... V4 2017 01 25 13 05 00 -14.2474 -170.5644 47.00 42.00 5.00 419613 SMO 2016 12 29 00 55 00 1368-99 G co CCGG 58.780 -999.990 ... V4 2017 01 25 13 21 00 -14.2474 -170.5644 47.00 42.00 5.00 419614 SMO 2016 12 29 22 45 00 232-99 S co CCGG 57.000 -999.990 ... V4 2017 01 25 12 34 00 -14.2474 -170.5644 60.30 42.00 18.30 419615 SMO 2016 12 29 22 45 00 4634-99 S co CCGG 56.400 -999.990 ... V4 2017 01 25 12 50 00 -14.2474 -170.5644 60.30 42.00 18.30 419616 SMO 2017 01 03 00 35 00 1764-99 S co CCGG 46.910 -999.990 ... V4 2017 01 25 13 53 00 -14.2474 -170.5644 60.30 42.00 18.30 419620 SMO 2017 01 03 00 35 00 3786-99 S co CCGG 47.730 -999.990 ... V4 2017 01 25 13 37 00 -14.2474 -170.5644 60.30 42.00 18.30 419619 SMO 2017 01 03 03 00 00 3424-99 G co CCGG 58.030 -999.990 ... V4 2017 01 25 14 25 00 -14.2474 -170.5644 47.00 42.00 5.00 419618 SMO 2017 01 03 03 00 00 929-99 G co CCGG 58.470 -999.990 ... V4 2017 01 25 14 09 00 -14.2474 -170.5644 47.00 42.00 5.00 419617 SMO 2017 01 11 00 42 00 242-99 S co CCGG 57.940 -999.990 ... V4 2017 02 03 15 45 00 -14.2474 -170.5644 60.30 42.00 18.30 420004 SMO 2017 01 11 00 42 00 2475-99 S co CCGG 56.800 -999.990 ... V4 2017 02 03 16 01 00 -14.2474 -170.5644 60.30 42.00 18.30 420005 SMO 2017 01 11 02 51 00 1933-99 G co CCGG 57.780 -999.990 ... V4 2017 02 03 16 17 00 -14.2474 -170.5644 47.00 42.00 5.00 420002 SMO 2017 01 11 02 51 00 2563-99 G co CCGG 58.340 -999.990 ... V4 2017 02 03 16 33 00 -14.2474 -170.5644 47.00 42.00 5.00 420003 SMO 2017 01 21 02 39 00 2603-99 G co CCGG 60.480 -999.990 ... V4 2017 02 13 16 50 00 -14.2474 -170.5644 47.00 42.00 5.00 420598 SMO 2017 01 21 02 39 00 5299-99 G co CCGG 60.230 -999.990 ... V4 2017 02 13 16 34 00 -14.2474 -170.5644 47.00 42.00 5.00 420597 SMO 2017 01 21 03 35 00 2779-99 S co CCGG 60.230 -999.990 ... V4 2017 02 13 16 03 00 -14.2474 -170.5644 60.30 42.00 18.30 420595 SMO 2017 01 21 03 35 00 5336-99 S co CCGG 59.220 -999.990 ... V4 2017 02 13 16 18 00 -14.2474 -170.5644 60.30 42.00 18.30 420596 SMO 2017 01 26 23 40 00 1505-99 S co CCGG 64.430 -999.990 ... V4 2017 04 05 11 58 00 -14.2474 -170.5644 60.30 42.00 18.30 423155 SMO 2017 01 26 23 40 00 876-99 S co CCGG 62.590 -999.990 ... V4 2017 04 05 11 42 00 -14.2474 -170.5644 60.30 42.00 18.30 423154 SMO 2017 01 27 00 50 00 4784-99 G co CCGG 61.430 -999.990 ... V4 2017 04 17 14 40 00 -14.2474 -170.5644 47.00 42.00 5.00 423156 SMO 2017 01 31 21 37 00 1799-99 S co CCGG 57.730 -999.990 ... V4 2017 03 08 16 12 00 -14.2474 -170.5644 60.30 42.00 18.30 422255 SMO 2017 01 31 21 37 00 2921-99 S co CCGG 57.380 -999.990 ... V4 2017 03 08 16 27 00 -14.2474 -170.5644 60.30 42.00 18.30 422254 SMO 2017 01 31 23 10 00 2760-99 G co CCGG 57.930 -999.990 ... V4 2017 03 08 15 56 00 -14.2474 -170.5644 47.00 42.00 5.00 422256 SMO 2017 01 31 23 10 00 501-99 G co CCGG 58.820 -999.990 ... V4 2017 03 08 15 40 00 -14.2474 -170.5644 47.00 42.00 5.00 422257 SMO 2017 02 08 00 38 00 1888-99 S co CCGG 62.730 -999.990 ... V4 2017 03 03 14 30 00 -14.2474 -170.5644 60.30 42.00 18.30 421598 SMO 2017 02 08 00 38 00 4023-99 S co CCGG 61.540 -999.990 ... V4 2017 03 03 14 46 00 -14.2474 -170.5644 60.30 42.00 18.30 421599 SMO 2017 02 08 03 07 00 4080-99 G co CCGG 60.650 -999.990 ... V4 2017 03 03 15 18 00 -14.2474 -170.5644 47.00 42.00 5.00 421600 SMO 2017 02 08 03 07 00 5637-99 G co CCGG 59.410 -999.990 ... V4 2017 03 03 15 02 00 -14.2474 -170.5644 47.00 42.00 5.00 421601 SMO 2017 02 17 23 36 00 1014-99 S co CCGG 67.370 -999.990 ... V4 2017 04 25 12 49 00 -14.2474 -170.5644 60.30 42.00 18.30 424092 SMO 2017 02 17 23 36 00 65-99 S co CCGG 67.870 -999.990 ... V4 2017 04 25 12 33 00 -14.2474 -170.5644 60.30 42.00 18.30 424091 SMO 2017 02 18 01 21 00 4357-99 G co CCGG 66.030 -999.990 ... V4 2017 04 25 12 17 00 -14.2474 -170.5644 47.00 42.00 5.00 424090 SMO 2017 02 18 01 21 00 5054-99 G co CCGG 65.380 -999.990 ... V4 2017 04 25 12 01 00 -14.2474 -170.5644 47.00 42.00 5.00 424089 SMO 2017 02 21 18 39 00 2325-99 S co CCGG 71.770 -999.990 .X. V4 2017 03 22 14 00 00 -14.2474 -170.5644 60.30 42.00 18.30 422512 SMO 2017 02 21 18 39 00 4958-99 S co CCGG 71.040 -999.990 .X. V4 2017 03 22 13 44 00 -14.2474 -170.5644 60.30 42.00 18.30 422513 SMO 2017 02 21 19 25 00 5064-99 G co CCGG 71.400 -999.990 .X. V4 2017 03 22 13 28 00 -14.2474 -170.5644 47.00 42.00 5.00 422511 SMO 2017 02 21 19 25 00 5201-99 G co CCGG 71.460 -999.990 .X. V4 2017 03 22 13 12 00 -14.2474 -170.5644 47.00 42.00 5.00 422510 SMO 2017 02 27 23 35 00 3222-99 S co CCGG 52.780 -999.990 ... V4 2017 03 29 15 44 00 -14.2474 -170.5644 60.30 42.00 18.30 422834 SMO 2017 02 27 23 35 00 79-99 S co CCGG 53.960 -999.990 ... V4 2017 03 29 15 28 00 -14.2474 -170.5644 60.30 42.00 18.30 422833 SMO 2017 02 28 00 58 00 3209-99 G co CCGG 54.090 -999.990 ... V4 2017 03 29 14 57 00 -14.2474 -170.5644 47.00 42.00 5.00 422836 SMO 2017 02 28 00 58 00 3998-99 G co CCGG 54.710 -999.990 ... V4 2017 03 29 15 12 00 -14.2474 -170.5644 47.00 42.00 5.00 422835 SMO 2017 03 08 03 35 00 1316-99 S co CCGG 51.600 -999.990 ... V4 2017 04 04 11 02 00 -14.2474 -170.5644 60.30 42.00 18.30 423138 SMO 2017 03 08 03 35 00 4885-99 S co CCGG 53.020 -999.990 ... V4 2017 04 04 10 46 00 -14.2474 -170.5644 60.30 42.00 18.30 423139 SMO 2017 03 08 05 01 00 1135-99 G co CCGG 155.130 -999.990 A.. V4 2017 04 04 08 39 00 -14.2474 -170.5644 47.00 42.00 5.00 423140 SMO 2017 03 08 05 01 00 1135-99 G co CCGG 52.370 -999.990 ... V4 2017 04 04 12 21 00 -14.2474 -170.5644 47.00 42.00 5.00 423140 SMO 2017 03 08 05 01 00 5423-99 G co CCGG 51.940 -999.990 ... V4 2017 04 04 08 55 00 -14.2474 -170.5644 47.00 42.00 5.00 423141 SMO 2017 03 14 03 39 00 1557-99 S co CCGG 57.720 -999.990 ... V4 2017 04 10 15 04 00 -14.2474 -170.5644 60.30 42.00 18.30 423428 SMO 2017 03 14 03 39 00 2461-99 S co CCGG 57.710 -999.990 ... V4 2017 04 10 15 20 00 -14.2474 -170.5644 60.30 42.00 18.30 423427 SMO 2017 03 14 06 09 00 1914-99 G co CCGG 57.980 -999.990 ... V4 2017 04 10 15 52 00 -14.2474 -170.5644 47.00 42.00 5.00 423426 SMO 2017 03 14 06 09 00 862-99 G co CCGG 58.230 -999.990 ... V4 2017 04 10 15 36 00 -14.2474 -170.5644 47.00 42.00 5.00 423425 SMO 2017 03 24 00 42 00 4711-99 S co CCGG 48.130 -999.990 ... V4 2017 04 12 17 14 00 -14.2474 -170.5644 60.30 42.00 18.30 423884 SMO 2017 03 24 00 42 00 923-99 S co CCGG 54.030 -999.990 A.. V4 2017 04 12 16 58 00 -14.2474 -170.5644 60.30 42.00 18.30 423883 SMO 2017 03 24 03 35 00 1499-99 G co CCGG 48.230 -999.990 ... V4 2017 04 17 13 53 00 -14.2474 -170.5644 47.00 42.00 5.00 423869 SMO 2017 03 24 03 35 00 1760-99 G co CCGG 48.160 -999.990 ... V4 2017 04 17 14 09 00 -14.2474 -170.5644 47.00 42.00 5.00 423870 SMO 2017 03 28 00 42 00 1011-99 S co CCGG 46.680 -999.990 ... V4 2017 04 20 15 12 00 -14.2474 -170.5644 60.30 42.00 18.30 423909 SMO 2017 03 28 00 42 00 424-99 S co CCGG 47.770 -999.990 ... V4 2017 04 20 14 56 00 -14.2474 -170.5644 60.30 42.00 18.30 423910 SMO 2017 03 28 01 07 00 2977-99 G co CCGG 47.310 -999.990 ... V4 2017 04 20 14 40 00 -14.2474 -170.5644 47.00 42.00 5.00 423908 SMO 2017 03 28 01 07 00 3301-99 G co CCGG 47.950 -999.990 ... V4 2017 04 20 14 24 00 -14.2474 -170.5644 47.00 42.00 5.00 423907 SMO 2017 04 04 21 36 00 1337-99 S co CCGG 74.440 -999.990 .X. V4 2017 04 26 12 33 00 -14.2474 -170.5644 60.30 42.00 18.30 424239 SMO 2017 04 04 21 36 00 2292-99 S co CCGG 74.890 -999.990 .X. V4 2017 04 26 12 18 00 -14.2474 -170.5644 60.30 42.00 18.30 424240 SMO 2017 04 04 23 37 00 673-99 G co CCGG 80.540 -999.990 .X. V4 2017 04 25 13 21 00 -14.2474 -170.5644 60.30 42.00 18.30 424093 SMO 2017 04 22 00 01 00 5012-99 G co CCGG 47.930 -999.990 ... V4 2017 05 12 13 47 00 -14.2474 -170.5644 47.00 42.00 5.00 424974 SMO 2017 04 22 00 01 00 566-99 G co CCGG 49.110 -999.990 ... V4 2017 05 12 13 31 00 -14.2474 -170.5644 47.00 42.00 5.00 424975 SMO 2017 04 22 03 40 00 2583-99 S co CCGG 48.900 -999.990 ... V4 2017 05 11 16 42 00 -14.2474 -170.5644 60.30 42.00 18.30 424973 SMO 2017 04 22 03 40 00 2695-99 S co CCGG 48.900 -999.990 ... V4 2017 05 11 16 26 00 -14.2474 -170.5644 60.30 42.00 18.30 424972 SMO 2017 04 26 03 30 00 1218-99 G co CCGG 48.580 -999.990 ... V4 2017 05 12 14 03 00 -14.2474 -170.5644 47.00 42.00 5.00 424976 SMO 2017 04 26 03 30 00 4281-99 G co CCGG 48.410 -999.990 ... V4 2017 05 12 14 18 00 -14.2474 -170.5644 47.00 42.00 5.00 424977 SMO 2017 04 26 04 40 00 2068-99 S co CCGG 49.090 -999.990 ... V4 2017 05 12 11 56 00 -14.2474 -170.5644 60.30 42.00 18.30 424984 SMO 2017 05 05 19 35 00 3833-99 S co CCGG 64.100 -999.990 ... V2 2017 06 12 13 23 00 -14.2474 -170.5644 60.30 42.00 18.30 426266 SMO 2017 05 05 19 35 00 402-99 S co CCGG 61.420 -999.990 ... V2 2017 06 12 13 08 00 -14.2474 -170.5644 60.30 42.00 18.30 426267 SMO 2017 05 05 20 51 00 1335-99 G co CCGG 60.810 -999.990 ... V2 2017 06 12 12 36 00 -14.2474 -170.5644 47.00 42.00 5.00 426270 SMO 2017 05 05 20 51 00 3545-99 G co CCGG 62.850 -999.990 ... V2 2017 06 12 12 52 00 -14.2474 -170.5644 47.00 42.00 5.00 426271 SMO 2017 05 08 23 35 00 4148-99 G co CCGG 54.370 -999.990 ... V2 2017 06 12 13 39 00 -14.2474 -170.5644 47.00 42.00 5.00 426268 SMO 2017 05 08 23 35 00 4669-99 G co CCGG 54.740 -999.990 ... V2 2017 06 12 13 55 00 -14.2474 -170.5644 47.00 42.00 5.00 426269 SMO 2017 05 09 00 38 00 1946-99 S co CCGG 56.200 -999.990 ... V2 2017 06 12 14 27 00 -14.2474 -170.5644 60.30 42.00 18.30 426264 SMO 2017 05 09 00 38 00 5186-99 S co CCGG 54.900 -999.990 ... V2 2017 06 12 14 11 00 -14.2474 -170.5644 60.30 42.00 18.30 426265 SMO 2017 05 17 23 35 00 1038-99 S co CCGG 52.450 -999.990 ... V2 2017 07 12 12 16 00 -14.2474 -170.5644 60.30 42.00 18.30 427517 SMO 2017 05 17 23 35 00 1973-99 S co CCGG 51.160 -999.990 ... V2 2017 07 12 12 31 00 -14.2474 -170.5644 60.30 42.00 18.30 427518 SMO 2017 05 18 01 25 00 1346-99 G co CCGG 51.780 -999.990 ... V2 2017 07 12 13 03 00 -14.2474 -170.5644 47.00 42.00 5.00 427520 SMO 2017 05 18 01 25 00 5536-99 G co CCGG 51.480 -999.990 ... V2 2017 07 12 12 47 00 -14.2474 -170.5644 47.00 42.00 5.00 427519 SMO 2017 06 02 21 06 00 1771-99 G co CCGG 51.730 -999.990 ... V2 2017 06 29 14 29 00 -14.2474 -170.5644 47.00 42.00 5.00 427326 SMO 2017 06 02 21 06 00 691-99 G co CCGG 52.630 -999.990 ... V2 2017 06 29 14 13 00 -14.2474 -170.5644 47.00 42.00 5.00 427327 SMO 2017 06 02 21 50 00 1812-99 S co CCGG 51.260 -999.990 ... V2 2017 06 29 13 57 00 -14.2474 -170.5644 60.30 42.00 18.30 427328 SMO 2017 06 02 21 50 00 2490-99 S co CCGG 51.750 -999.990 ... V2 2017 06 29 13 41 00 -14.2474 -170.5644 60.30 42.00 18.30 427329 SMO 2017 06 06 00 36 00 3894-99 S co CCGG 53.600 -999.990 ... V2 2017 07 20 11 42 00 -14.2474 -170.5644 60.30 42.00 18.30 427841 SMO 2017 06 06 00 36 00 5126-99 S co CCGG 52.180 -999.990 ... V2 2017 07 20 11 58 00 -14.2474 -170.5644 60.30 42.00 18.30 427842 SMO 2017 06 06 01 13 00 1250-99 G co CCGG 53.420 -999.990 ... V2 2017 07 18 16 39 00 -14.2474 -170.5644 47.00 42.00 5.00 427788 SMO 2017 06 06 01 13 00 510-99 G co CCGG 53.660 -999.990 ... V2 2017 07 18 16 23 00 -14.2474 -170.5644 47.00 42.00 5.00 427787 SMO 2017 06 23 21 37 00 1634-99 S co CCGG 55.530 -999.990 ... V2 2017 07 19 09 15 00 -14.2474 -170.5644 60.30 42.00 18.30 427791 SMO 2017 06 23 21 37 00 2219-99 S co CCGG 55.070 -999.990 ... V2 2017 07 19 09 31 00 -14.2474 -170.5644 60.30 42.00 18.30 427792 SMO 2017 06 23 21 56 00 2952-99 G co CCGG 55.070 -999.990 ... V2 2017 07 19 09 47 00 -14.2474 -170.5644 47.00 42.00 5.00 427789 SMO 2017 06 23 21 56 00 5074-99 G co CCGG 54.400 -999.990 ... V2 2017 07 19 10 03 00 -14.2474 -170.5644 47.00 42.00 5.00 427790 SMO 2017 07 04 21 39 00 2039-99 S co CCGG 56.980 -999.990 ... V2 2017 07 27 11 11 00 -14.2474 -170.5644 60.30 42.00 18.30 428385 SMO 2017 07 04 21 39 00 2040-99 S co CCGG 55.760 -999.990 ... V2 2017 07 27 11 26 00 -14.2474 -170.5644 60.30 42.00 18.30 428386 SMO 2017 07 05 00 50 00 2631-99 G co CCGG 56.330 -999.990 ... V2 2017 07 27 13 01 00 -14.2474 -170.5644 47.00 42.00 5.00 428387 SMO 2017 07 05 00 50 00 4710-99 G co CCGG 56.150 -999.990 ... V2 2017 07 27 12 46 00 -14.2474 -170.5644 47.00 42.00 5.00 428388 SMO 2017 07 12 21 39 00 3003-99 S co CCGG 54.990 -999.990 ... V2 2017 08 04 09 44 00 -14.2474 -170.5644 60.30 42.00 18.30 428491 SMO 2017 07 12 21 39 00 4388-99 S co CCGG 55.170 -999.990 ... V2 2017 08 04 10 00 00 -14.2474 -170.5644 60.30 42.00 18.30 428492 SMO 2017 07 12 22 50 00 1153-99 G co CCGG 56.000 -999.990 ... V2 2017 08 04 10 16 00 -14.2474 -170.5644 47.00 42.00 5.00 428489 SMO 2017 07 12 22 50 00 1630-99 G co CCGG 55.850 -999.990 ... V2 2017 08 04 10 32 00 -14.2474 -170.5644 47.00 42.00 5.00 428490 SMO 2017 07 20 00 38 00 1592-99 S co CCGG 54.090 -999.990 ... V2 2017 08 17 11 15 00 -14.2474 -170.5644 60.30 42.00 18.30 429260 SMO 2017 07 20 00 38 00 4711-99 S co CCGG 54.730 -999.990 ... V2 2017 08 17 10 59 00 -14.2474 -170.5644 60.30 42.00 18.30 429261 SMO 2017 07 20 01 18 00 1263-99 G co CCGG 62.920 -999.990 N.. V2 2017 08 16 15 08 00 -14.2474 -170.5644 47.00 42.00 5.00 429262 SMO 2017 07 20 01 18 00 4620-99 G co CCGG 56.450 -999.990 ... V2 2017 08 16 15 23 00 -14.2474 -170.5644 47.00 42.00 5.00 429263 SMO 2017 07 26 00 50 00 1479-99 G co CCGG 56.260 -999.990 ... V2 2017 08 17 14 42 00 -14.2474 -170.5644 47.00 42.00 5.00 429346 SMO 2017 07 26 00 50 00 2881-99 G co CCGG 55.890 -999.990 ... V2 2017 08 17 14 58 00 -14.2474 -170.5644 47.00 42.00 5.00 429347 SMO 2017 07 26 01 40 00 3763-99 S co CCGG 55.560 -999.990 ... V2 2017 08 17 14 11 00 -14.2474 -170.5644 60.30 42.00 18.30 429344 SMO 2017 07 26 01 40 00 3764-99 S co CCGG 56.500 -999.990 ... V2 2017 08 17 14 26 00 -14.2474 -170.5644 60.30 42.00 18.30 429345 SMO 2017 08 03 22 32 00 1-99 G co CCGG 56.980 -999.990 ... V2 2017 09 06 11 12 00 -14.2474 -170.5644 47.00 42.00 5.00 430012 SMO 2017 08 03 22 32 00 5219-99 G co CCGG 56.740 -999.990 ... V2 2017 09 06 11 28 00 -14.2474 -170.5644 47.00 42.00 5.00 430013 SMO 2017 08 03 23 38 00 2798-99 S co CCGG 56.710 -999.990 ... V2 2017 09 06 10 54 00 -14.2474 -170.5644 60.30 42.00 18.30 430010 SMO 2017 08 03 23 38 00 4709-99 S co CCGG 55.860 -999.990 ... V2 2017 09 06 10 38 00 -14.2474 -170.5644 60.30 42.00 18.30 430011 SMO 2017 08 11 02 18 00 4376-99 G co CCGG 59.220 -999.990 ... V2 2017 09 13 14 16 00 -14.2474 -170.5644 47.00 42.00 5.00 430357 SMO 2017 08 11 02 18 00 4990-99 G co CCGG 58.770 -999.990 ... V2 2017 09 13 14 32 00 -14.2474 -170.5644 47.00 42.00 5.00 430358 SMO 2017 08 11 03 35 00 1166-99 S co CCGG 59.510 -999.990 ... V2 2017 09 13 14 00 00 -14.2474 -170.5644 60.30 42.00 18.30 430356 SMO 2017 08 11 03 35 00 1233-99 S co CCGG 58.840 -999.990 ... V2 2017 09 13 13 44 00 -14.2474 -170.5644 60.30 42.00 18.30 430355 SMO 2017 08 16 00 35 00 1069-99 S co CCGG 57.150 -999.990 ... V2 2017 09 08 16 20 00 -14.2474 -170.5644 60.30 42.00 18.30 430346 SMO 2017 08 16 00 35 00 1176-99 S co CCGG 57.680 -999.990 ... V2 2017 09 08 16 04 00 -14.2474 -170.5644 60.30 42.00 18.30 430345 SMO 2017 08 16 01 07 00 3235-99 G co CCGG 56.750 -999.990 ... V2 2017 09 08 15 33 00 -14.2474 -170.5644 47.00 42.00 5.00 430347 SMO 2017 08 16 01 07 00 3609-99 G co CCGG 57.450 -999.990 ... V2 2017 09 08 15 48 00 -14.2474 -170.5644 47.00 42.00 5.00 430348 SMO 2017 08 22 20 36 00 1950-99 S co CCGG 56.810 -999.990 ... V2 2017 09 15 12 38 00 -14.2474 -170.5644 60.30 42.00 18.30 430674 SMO 2017 08 22 20 36 00 626-99 S co CCGG 57.410 -999.990 ... V2 2017 09 15 12 22 00 -14.2474 -170.5644 60.30 42.00 18.30 430673 SMO 2017 08 22 21 02 00 4846-99 G co CCGG 57.730 -999.990 ... V2 2017 09 15 12 53 00 -14.2474 -170.5644 47.00 42.00 5.00 430671 SMO 2017 08 22 21 02 00 5690-99 G co CCGG 58.140 -999.990 ... V2 2017 09 15 13 09 00 -14.2474 -170.5644 47.00 42.00 5.00 430672 SMO 2017 08 30 00 19 00 2907-99 G co CCGG 59.770 -999.990 ... V2 2017 09 22 13 59 00 -14.2474 -170.5644 47.00 42.00 5.00 430867 SMO 2017 08 30 00 19 00 974-99 G co CCGG 59.580 -999.990 ... V2 2017 09 22 13 43 00 -14.2474 -170.5644 47.00 42.00 5.00 430868 SMO 2017 08 30 02 36 00 3409-99 S co CCGG 59.360 -999.990 ... V2 2017 10 13 12 49 00 -14.2474 -170.5644 60.30 42.00 18.30 430866 SMO 2017 09 06 00 39 00 1887-99 S co CCGG 57.340 -999.990 ... V2 2017 09 28 15 12 00 -14.2474 -170.5644 60.30 42.00 18.30 431374 SMO 2017 09 06 00 39 00 2390-99 S co CCGG 56.560 -999.990 ... V2 2017 09 28 15 28 00 -14.2474 -170.5644 60.30 42.00 18.30 431375 SMO 2017 09 06 02 09 00 1021-99 G co CCGG 57.510 -999.990 ... V2 2017 09 28 15 43 00 -14.2474 -170.5644 47.00 42.00 5.00 431372 SMO 2017 09 06 02 09 00 4921-99 G co CCGG 57.210 -999.990 ... V2 2017 09 28 15 59 00 -14.2474 -170.5644 47.00 42.00 5.00 431373 SMO 2017 09 21 20 41 00 3484-99 S co CCGG 62.720 -999.990 ... V2 2017 10 16 15 05 00 -14.2474 -170.5644 60.30 42.00 18.30 432315 SMO 2017 09 21 20 41 00 5216-99 S co CCGG 65.440 -999.990 N.. V2 2017 10 16 15 21 00 -14.2474 -170.5644 60.30 42.00 18.30 432316 SMO 2017 09 21 22 25 00 4849-99 G co CCGG 62.140 -999.990 ... V2 2017 10 16 15 53 00 -14.2474 -170.5644 47.00 42.00 5.00 432313 SMO 2017 09 21 22 25 00 881-99 G co CCGG 62.020 -999.990 ... V2 2017 10 16 15 37 00 -14.2474 -170.5644 47.00 42.00 5.00 432314 SMO 2017 09 26 22 25 00 1424-99 G co CCGG 61.370 -999.990 ... V2 2017 10 18 15 10 00 -14.2474 -170.5644 47.00 42.00 5.00 432583 SMO 2017 09 26 22 25 00 5-99 G co CCGG 61.560 -999.990 ... V2 2017 10 18 14 54 00 -14.2474 -170.5644 47.00 42.00 5.00 432584 SMO 2017 09 26 23 40 00 2130-99 S co CCGG 60.730 -999.990 ... V2 2017 10 25 15 10 00 -14.2474 -170.5644 60.30 42.00 18.30 432725 SMO 2017 09 26 23 40 00 2245-99 S co CCGG 60.570 -999.990 N.. V2 2017 10 25 15 26 00 -14.2474 -170.5644 60.30 42.00 18.30 432726 SMO 2017 10 05 22 44 00 1468-99 S co CCGG 72.510 -999.990 ... V2 2017 11 02 12 04 00 -14.2474 -170.5644 60.30 42.00 18.30 433144 SMO 2017 10 05 22 44 00 3091-99 S co CCGG 72.650 -999.990 ... V2 2017 11 02 12 20 00 -14.2474 -170.5644 60.30 42.00 18.30 433145 SMO 2017 10 06 00 12 00 3214-99 G co CCGG 73.320 -999.990 ... V2 2017 11 01 11 59 00 -14.2474 -170.5644 47.00 42.00 5.00 433126 SMO 2017 10 06 00 12 00 4885-99 G co CCGG 72.810 -999.990 ... V2 2017 11 01 12 14 00 -14.2474 -170.5644 47.00 42.00 5.00 433127 SMO 2017 10 10 23 38 00 2871-99 S co CCGG 71.520 -999.990 ... V2 2017 10 30 09 40 00 -14.2474 -170.5644 60.30 42.00 18.30 432997 SMO 2017 10 10 23 38 00 2997-99 S co CCGG 70.400 -999.990 ... V2 2017 10 30 09 56 00 -14.2474 -170.5644 60.30 42.00 18.30 432998 SMO 2017 10 11 00 25 00 2944-99 G co CCGG 70.670 -999.990 ... V2 2017 10 27 15 15 00 -14.2474 -170.5644 47.00 42.00 5.00 432999 SMO 2017 10 11 00 25 00 402-99 G co CCGG 70.400 -999.990 ... V2 2017 10 27 14 59 00 -14.2474 -170.5644 47.00 42.00 5.00 433000 SMO 2017 10 20 22 12 00 3905-99 G co CCGG 67.950 -999.990 ... V2 2017 11 07 14 13 00 -14.2474 -170.5644 47.00 42.00 5.00 433677 SMO 2017 10 20 22 12 00 4136-99 G co CCGG 69.020 -999.990 ... V2 2017 11 07 14 29 00 -14.2474 -170.5644 47.00 42.00 5.00 433676 SMO 2017 10 20 22 44 00 2396-99 S co CCGG 67.340 -999.990 ... V2 2017 11 07 15 00 00 -14.2474 -170.5644 60.30 42.00 18.30 433674 SMO 2017 10 20 22 44 00 912-99 S co CCGG 67.610 -999.990 ... V2 2017 11 07 14 44 00 -14.2474 -170.5644 60.30 42.00 18.30 433675 SMO 2017 10 24 00 37 00 1973-99 S co CCGG 64.650 -999.990 ... V2 2017 11 08 13 31 00 -14.2474 -170.5644 60.30 42.00 18.30 433805 SMO 2017 10 24 00 37 00 2668-99 S co CCGG 64.930 -999.990 ... V2 2017 11 08 13 47 00 -14.2474 -170.5644 60.30 42.00 18.30 433806 SMO 2017 10 24 02 47 00 1038-99 G co CCGG 70.640 -999.990 ... V2 2017 11 08 12 59 00 -14.2474 -170.5644 47.00 42.00 5.00 433807 SMO 2017 10 24 02 47 00 5112-99 G co CCGG 70.980 -999.990 ... V2 2017 11 08 13 15 00 -14.2474 -170.5644 47.00 42.00 5.00 433808 SMO 2017 10 30 22 36 00 339-99 G co CCGG 67.530 -999.990 ... V2 2017 11 21 09 32 00 -14.2474 -170.5644 47.00 42.00 5.00 434482 SMO 2017 10 30 22 36 00 4207-99 G co CCGG 67.570 -999.990 ... V2 2017 11 21 09 48 00 -14.2474 -170.5644 47.00 42.00 5.00 434483 SMO 2017 10 30 23 25 00 2416-99 S co CCGG 67.070 -999.990 ... V2 2017 11 21 10 04 00 -14.2474 -170.5644 60.30 42.00 18.30 434480 SMO 2017 10 30 23 25 00 768-99 S co CCGG 66.060 -999.990 ... V2 2017 11 21 10 20 00 -14.2474 -170.5644 60.30 42.00 18.30 434481 SMO 2017 11 09 02 38 00 183-99 S co CCGG 58.810 -999.990 ... V2 2017 12 04 12 36 00 -14.2474 -170.5644 60.30 42.00 18.30 434929 SMO 2017 11 09 02 38 00 3200-99 S co CCGG 58.680 -999.990 ... V2 2017 12 04 12 52 00 -14.2474 -170.5644 60.30 42.00 18.30 434930 SMO 2017 11 09 03 15 00 3808-99 G co CCGG 59.430 -999.990 ... V2 2017 12 04 12 04 00 -14.2474 -170.5644 47.00 42.00 5.00 434927 SMO 2017 11 09 03 15 00 4377-99 G co CCGG 59.170 -999.990 ... V2 2017 12 04 12 20 00 -14.2474 -170.5644 47.00 42.00 5.00 434928 SMO 2017 11 15 22 37 00 2358-99 S co CCGG 68.740 -999.990 ... V2 2018 01 02 15 03 00 -14.2474 -170.5644 60.30 42.00 18.30 436093 SMO 2017 11 15 22 37 00 3937-99 S co CCGG 67.810 -999.990 ... V2 2018 01 02 15 19 00 -14.2474 -170.5644 60.30 42.00 18.30 436094 SMO 2017 11 15 23 30 00 4719-99 G co CCGG 68.910 -999.990 ... V2 2018 01 02 14 31 00 -14.2474 -170.5644 47.00 42.00 5.00 436091 SMO 2017 11 15 23 30 00 5011-99 G co CCGG 67.730 -999.990 ... V2 2018 01 02 14 47 00 -14.2474 -170.5644 47.00 42.00 5.00 436092 SMO 2017 11 20 23 40 00 2646-99 S co CCGG 60.580 -999.990 ... V2 2017 12 12 11 45 00 -14.2474 -170.5644 60.30 42.00 18.30 435086 SMO 2017 11 20 23 40 00 3760-99 S co CCGG 61.210 -999.990 ... V2 2017 12 12 11 29 00 -14.2474 -170.5644 60.30 42.00 18.30 435087 SMO 2017 11 21 00 35 00 5540-99 G co CCGG 61.630 -999.990 ... V2 2017 12 12 12 17 00 -14.2474 -170.5644 47.00 42.00 5.00 435085 SMO 2017 11 21 00 35 00 671-99 G co CCGG 61.160 -999.990 ... V2 2017 12 12 12 01 00 -14.2474 -170.5644 47.00 42.00 5.00 435084 SMO 2017 12 01 01 43 00 2835-99 S co CCGG 59.300 -999.990 ... V2 2017 12 21 14 23 00 -14.2474 -170.5644 60.30 42.00 18.30 436188 SMO 2017 12 01 01 43 00 4966-99 S co CCGG 58.060 -999.990 ... V2 2017 12 21 14 38 00 -14.2474 -170.5644 60.30 42.00 18.30 436189 SMO 2017 12 01 02 12 00 4262-99 G co CCGG 58.420 -999.990 ... V2 2017 12 21 14 54 00 -14.2474 -170.5644 47.00 42.00 5.00 436186 SMO 2017 12 01 02 12 00 5627-99 G co CCGG 58.140 -999.990 ... V2 2017 12 21 15 10 00 -14.2474 -170.5644 47.00 42.00 5.00 436187 SMO 2017 12 08 21 36 00 1533-99 S co CCGG 59.240 -999.990 ... V2 2018 01 12 13 56 00 -14.2474 -170.5644 60.30 42.00 18.30 436816 SMO 2017 12 08 21 36 00 350-99 S co CCGG 59.620 -999.990 ... V2 2018 01 12 13 40 00 -14.2474 -170.5644 60.30 42.00 18.30 436817 SMO 2017 12 08 22 50 00 5535-99 G co CCGG 57.420 -999.990 ... V2 2018 01 12 12 01 00 -14.2474 -170.5644 47.00 42.00 5.00 436814 SMO 2017 12 08 22 50 00 5678-99 G co CCGG 57.920 -999.990 ... V2 2018 01 12 12 17 00 -14.2474 -170.5644 47.00 42.00 5.00 436815 SMO 2017 12 15 22 40 00 2498-99 S co CCGG 53.940 -999.990 ... V2 2018 01 18 08 57 00 -14.2474 -170.5644 60.30 42.00 18.30 436741 SMO 2017 12 15 22 40 00 4171-99 S co CCGG 51.200 -999.990 ... V2 2018 01 18 09 13 00 -14.2474 -170.5644 60.30 42.00 18.30 436742 SMO 2017 12 15 23 30 00 1773-99 G co CCGG 54.060 -999.990 ... V2 2018 01 17 15 41 00 -14.2474 -170.5644 47.00 42.00 5.00 436740 SMO 2017 12 15 23 30 00 442-99 G co CCGG 54.370 -999.990 ... V2 2018 01 17 15 25 00 -14.2474 -170.5644 47.00 42.00 5.00 436739 SMO 2017 12 21 22 39 00 2162-99 S co CCGG 58.630 -999.990 ... V2 2018 01 23 15 52 00 -14.2474 -170.5644 60.30 42.00 18.30 437334 SMO 2017 12 21 22 39 00 4276-99 S co CCGG 59.130 -999.990 ... V2 2018 01 23 16 08 00 -14.2474 -170.5644 60.30 42.00 18.30 437335 SMO 2017 12 21 23 14 00 2318-99 G co CCGG 59.870 -999.990 ... V2 2018 01 23 15 36 00 -14.2474 -170.5644 47.00 42.00 5.00 437333 SMO 2017 12 21 23 14 00 3174-99 G co CCGG 61.590 -999.990 ... V2 2018 01 23 15 21 00 -14.2474 -170.5644 47.00 42.00 5.00 437332 SMO 2017 12 28 21 35 00 1482-99 S co CCGG 59.700 -999.990 ... V2 2018 02 05 15 48 00 -14.2474 -170.5644 60.30 42.00 18.30 437619 SMO 2017 12 28 21 35 00 3881-99 S co CCGG 59.730 -999.990 ... V2 2018 02 05 16 04 00 -14.2474 -170.5644 60.30 42.00 18.30 437620 SMO 2017 12 28 22 34 00 3943-99 G co CCGG 60.720 -999.990 ... V2 2018 02 05 17 23 00 -14.2474 -170.5644 47.00 42.00 5.00 437618 SMO 2017 12 28 22 34 00 5138-99 G co CCGG 60.680 -999.990 ... V2 2018 02 05 17 39 00 -14.2474 -170.5644 47.00 42.00 5.00 437617 SMO 2018 01 05 22 26 00 1181-99 S co CCGG 59.660 -999.990 ... V2 2018 02 09 10 56 00 -14.2474 -170.5644 60.30 42.00 18.30 437809 SMO 2018 01 05 22 26 00 225-99 S co CCGG 61.370 -999.990 ... V2 2018 02 09 10 40 00 -14.2474 -170.5644 60.30 42.00 18.30 437810 SMO 2018 01 05 23 08 00 1435-99 G co CCGG 60.510 -999.990 ... V2 2018 02 08 14 06 00 -14.2474 -170.5644 47.00 42.00 5.00 437834 SMO 2018 01 05 23 08 00 4952-99 G co CCGG 60.770 -999.990 ... V2 2018 02 08 14 22 00 -14.2474 -170.5644 47.00 42.00 5.00 437835 SMO 2018 01 11 23 42 00 1483-99 S co CCGG 55.460 -999.990 ... V2 2018 02 09 17 17 00 -14.2474 -170.5644 60.30 42.00 18.30 437878 SMO 2018 01 11 23 42 00 1801-99 S co CCGG 55.880 -999.990 ... V2 2018 02 09 17 01 00 -14.2474 -170.5644 60.30 42.00 18.30 437879 SMO 2018 01 12 00 50 00 1504-99 G co CCGG 55.940 -999.990 ... V2 2018 02 09 16 29 00 -14.2474 -170.5644 47.00 42.00 5.00 437880 SMO 2018 01 12 00 50 00 2412-99 G co CCGG 56.510 -999.990 ... V2 2018 02 09 16 45 00 -14.2474 -170.5644 47.00 42.00 5.00 437881 SMO 2018 01 18 02 49 00 151-99 G co CCGG 57.850 -999.990 ... V2 2018 02 21 13 00 00 -14.2474 -170.5644 47.00 42.00 5.00 438204 SMO 2018 01 18 02 49 00 168-99 G co CCGG 54.070 -999.990 ... V2 2018 02 21 13 15 00 -14.2474 -170.5644 47.00 42.00 5.00 438203 SMO 2018 01 18 03 36 00 2881-99 S co CCGG 55.540 -999.990 ... V2 2018 02 21 13 47 00 -14.2474 -170.5644 60.30 42.00 18.30 438202 SMO 2018 01 18 03 36 00 817-99 S co CCGG 55.070 -999.990 ... V2 2018 02 21 13 31 00 -14.2474 -170.5644 60.30 42.00 18.30 438201 SMO 2018 01 25 21 41 00 681-99 S co CCGG 59.890 -999.990 ... V2 2018 03 06 09 05 00 -14.2474 -170.5644 60.30 42.00 18.30 439555 SMO 2018 01 25 21 41 00 929-99 S co CCGG 58.800 -999.990 ... V2 2018 03 06 09 21 00 -14.2474 -170.5644 60.30 42.00 18.30 439556 SMO 2018 01 25 22 25 00 1237-99 G co CCGG 61.910 -999.990 ... V2 2018 03 06 08 49 00 -14.2474 -170.5644 47.00 42.00 5.00 439557 SMO 2018 01 25 22 25 00 465-99 G co CCGG 61.610 -999.990 ... V2 2018 03 06 08 34 00 -14.2474 -170.5644 47.00 42.00 5.00 439558 SMO 2018 02 02 22 44 00 1082-99 S co CCGG 65.490 -999.990 ... V2 2018 03 02 16 56 00 -14.2474 -170.5644 60.30 42.00 18.30 439506 SMO 2018 02 02 22 44 00 1821-99 S co CCGG 64.290 -999.990 ... V2 2018 03 02 16 40 00 -14.2474 -170.5644 60.30 42.00 18.30 439505 SMO 2018 02 02 23 54 00 1509-99 G co CCGG 64.280 -999.990 ... V2 2018 03 02 16 08 00 -14.2474 -170.5644 47.00 42.00 5.00 439507 SMO 2018 02 02 23 54 00 5657-99 G co CCGG 63.930 -999.990 ... V2 2018 03 02 16 24 00 -14.2474 -170.5644 47.00 42.00 5.00 439508 SMO 2018 02 16 23 37 00 2974-99 S co CCGG 49.150 -999.990 ... V2 2018 03 20 12 30 00 -14.2474 -170.5644 60.30 42.00 18.30 440266 SMO 2018 02 16 23 37 00 4979-99 S co CCGG 48.340 -999.990 ... V2 2018 03 20 12 46 00 -14.2474 -170.5644 60.30 42.00 18.30 440267 SMO 2018 02 24 00 39 00 5624-99 S co CCGG 69.760 -999.990 ... V2 2018 03 20 12 14 00 -14.2474 -170.5644 60.30 42.00 18.30 440265 SMO 2018 02 24 00 39 00 979-99 S co CCGG 69.540 -999.990 ... V2 2018 03 20 11 58 00 -14.2474 -170.5644 60.30 42.00 18.30 440264 SMO 2018 03 02 23 25 00 1411-99 S co CCGG 53.070 -999.990 ... V2 2018 03 20 11 26 00 -14.2474 -170.5644 60.30 42.00 18.30 440262 SMO 2018 03 02 23 25 00 3028-99 S co CCGG 54.760 -999.990 ... V2 2018 03 20 11 42 00 -14.2474 -170.5644 60.30 42.00 18.30 440263 SMO 2018 03 03 00 03 00 5037-99 G co CCGG 54.090 -999.990 ... V2 2018 03 20 11 11 00 -14.2474 -170.5644 47.00 42.00 5.00 440261 SMO 2018 03 03 00 03 00 5706-99 G co CCGG 54.200 -999.990 ... V2 2018 03 20 10 55 00 -14.2474 -170.5644 47.00 42.00 5.00 440260 SMO 2018 03 09 01 37 00 2844-99 S co CCGG 76.730 -999.990 N.. V2 2018 04 02 14 54 00 -14.2474 -170.5644 60.30 42.00 18.30 440809 SMO 2018 03 09 01 37 00 3778-99 S co CCGG 57.190 -999.990 ... V2 2018 04 02 15 10 00 -14.2474 -170.5644 60.30 42.00 18.30 440810 SMO 2018 03 09 02 14 00 1725-99 G co CCGG 57.420 -999.990 ... V2 2018 04 02 14 22 00 -14.2474 -170.5644 47.00 42.00 5.00 440807 SMO 2018 03 09 02 14 00 2663-99 G co CCGG 57.080 -999.990 ... V2 2018 04 02 14 38 00 -14.2474 -170.5644 47.00 42.00 5.00 440808 SMO 2018 03 20 00 36 00 3837-99 S co CCGG 71.860 -999.990 N.. V2 2018 04 10 13 48 00 -14.2474 -170.5644 60.30 42.00 18.30 441217 SMO 2018 03 20 00 36 00 3838-99 S co CCGG 68.620 -999.990 ... V2 2018 04 10 14 04 00 -14.2474 -170.5644 60.30 42.00 18.30 441218 SMO 2018 03 20 02 00 00 533-99 G co CCGG 66.470 -999.990 ... V2 2018 04 10 11 41 00 -14.2474 -170.5644 47.00 42.00 5.00 441215 SMO 2018 03 20 02 00 00 534-99 G co CCGG 66.070 -999.990 ... V2 2018 04 10 11 57 00 -14.2474 -170.5644 47.00 42.00 5.00 441216 SMO 2018 03 28 23 37 00 168-99 S co CCGG 61.000 -999.990 ... V2 2018 04 20 10 58 00 -14.2474 -170.5644 60.30 42.00 18.30 441819 SMO 2018 03 28 23 37 00 2407-99 S co CCGG 61.270 -999.990 ... V2 2018 04 20 11 14 00 -14.2474 -170.5644 60.30 42.00 18.30 441820 SMO 2018 03 29 01 17 00 5355-99 G co CCGG 63.320 -999.990 ... V2 2018 04 20 10 26 00 -14.2474 -170.5644 47.00 42.00 5.00 441821 SMO 2018 03 29 01 17 00 955-99 G co CCGG 63.030 -999.990 ... V2 2018 04 20 10 42 00 -14.2474 -170.5644 47.00 42.00 5.00 441822 SMO 2018 04 04 22 36 00 5420-99 S co CCGG 67.380 -999.990 N.. V2 2018 04 20 11 45 00 -14.2474 -170.5644 60.30 42.00 18.30 441824 SMO 2018 04 04 22 36 00 907-99 S co CCGG 57.690 -999.990 N.. V2 2018 04 20 11 30 00 -14.2474 -170.5644 60.30 42.00 18.30 441826 SMO 2018 04 04 22 57 00 2033-99 G co CCGG 59.190 -999.990 ... V2 2018 04 20 12 01 00 -14.2474 -170.5644 47.00 42.00 5.00 441823 SMO 2018 04 04 22 57 00 5717-99 G co CCGG 59.400 -999.990 ... V2 2018 04 20 12 17 00 -14.2474 -170.5644 47.00 42.00 5.00 441825 SMO 2018 04 13 22 44 00 5218-99 S co CCGG 56.360 -999.990 ... V2 2018 05 01 12 28 00 -14.2474 -170.5644 60.30 42.00 18.30 442272 SMO 2018 04 13 22 44 00 5516-99 S co CCGG 56.580 -999.990 ... V2 2018 05 01 12 44 00 -14.2474 -170.5644 60.30 42.00 18.30 442273 SMO 2018 04 14 00 24 00 1690-99 G co CCGG 55.500 -999.990 ... V2 2018 05 01 13 00 00 -14.2474 -170.5644 47.00 42.00 5.00 442274 SMO 2018 04 14 00 24 00 3887-99 G co CCGG 55.830 -999.990 ... V2 2018 05 01 13 16 00 -14.2474 -170.5644 47.00 42.00 5.00 442275 SMO 2018 04 18 00 42 00 1961-99 S co CCGG 55.040 -999.990 ... V2 2018 05 09 12 17 00 -14.2474 -170.5644 60.30 42.00 18.30 442856 SMO 2018 04 18 00 42 00 2970-99 S co CCGG 55.290 -999.990 ... V2 2018 05 09 12 33 00 -14.2474 -170.5644 60.30 42.00 18.30 442857 SMO 2018 04 18 02 35 00 3360-99 G co CCGG 53.770 -999.990 ... V2 2018 05 09 12 49 00 -14.2474 -170.5644 47.00 42.00 5.00 442854 SMO 2018 04 18 02 35 00 3640-99 G co CCGG 54.020 -999.990 ... V2 2018 05 09 13 05 00 -14.2474 -170.5644 47.00 42.00 5.00 442855 SMO 2018 04 27 23 36 00 2983-99 G co CCGG 50.950 -999.990 ... V2 2018 05 22 16 04 00 -14.2474 -170.5644 60.30 42.00 18.30 443875 SMO 2018 04 27 23 36 00 319-99 G co CCGG 51.520 -999.990 ... V2 2018 05 22 15 48 00 -14.2474 -170.5644 60.30 42.00 18.30 443876 SMO 2018 04 27 23 57 00 1070-99 G co CCGG 53.730 -999.990 ... V2 2018 05 22 15 17 00 -14.2474 -170.5644 47.00 42.00 5.00 443873 SMO 2018 04 27 23 57 00 2742-99 G co CCGG 53.700 -999.990 ... V2 2018 05 22 15 32 00 -14.2474 -170.5644 47.00 42.00 5.00 443874 SMO 2018 05 04 22 35 00 3227-99 S co CCGG 55.350 -999.990 ... V2 2018 05 30 13 03 00 -14.2474 -170.5644 60.30 42.00 18.30 444020 SMO 2018 05 04 22 35 00 737-99 S co CCGG 55.990 -999.990 ... V2 2018 05 30 12 47 00 -14.2474 -170.5644 60.30 42.00 18.30 444019 SMO 2018 05 04 23 10 00 2354-99 G co CCGG 54.570 -999.990 ... V2 2018 05 30 13 19 00 -14.2474 -170.5644 47.00 42.00 5.00 444017 SMO 2018 05 04 23 10 00 3064-99 G co CCGG 54.740 -999.990 ... V2 2018 05 30 13 35 00 -14.2474 -170.5644 47.00 42.00 5.00 444018 SMO 2018 05 11 22 40 00 2583-99 S co CCGG 53.450 -999.990 ... V2 2018 06 05 12 31 00 -14.2474 -170.5644 60.30 42.00 18.30 444515 SMO 2018 05 11 22 40 00 2645-99 S co CCGG 51.890 -999.990 ... V2 2018 06 05 12 47 00 -14.2474 -170.5644 60.30 42.00 18.30 444516 SMO 2018 05 12 00 03 00 3207-99 G co CCGG 52.680 -999.990 ... V2 2018 06 05 12 00 00 -14.2474 -170.5644 47.00 42.00 5.00 444513 SMO 2018 05 12 00 03 00 4591-99 G co CCGG 52.510 -999.990 ... V2 2018 06 05 12 16 00 -14.2474 -170.5644 47.00 42.00 5.00 444514 SMO 2018 05 18 22 35 00 2318-99 S co CCGG 55.570 -999.990 ... V2 2018 06 07 12 58 00 -14.2474 -170.5644 60.30 42.00 18.30 444710 SMO 2018 05 18 22 35 00 3758-99 S co CCGG 56.400 -999.990 ... V2 2018 06 07 13 14 00 -14.2474 -170.5644 60.30 42.00 18.30 444709 SMO 2018 05 18 23 16 00 1509-99 G co CCGG 55.930 -999.990 ... V2 2018 06 07 14 33 00 -14.2474 -170.5644 47.00 42.00 5.00 444708 SMO 2018 05 18 23 16 00 2768-99 G co CCGG 56.010 -999.990 ... V2 2018 06 07 14 48 00 -14.2474 -170.5644 47.00 42.00 5.00 444707 SMO 2018 05 23 00 37 00 2006-99 S co CCGG 52.770 -999.990 ... V2 2018 06 06 12 18 00 -14.2474 -170.5644 60.30 42.00 18.30 444717 SMO 2018 05 23 00 37 00 2421-99 S co CCGG 51.600 -999.990 ... V2 2018 06 06 12 34 00 -14.2474 -170.5644 60.30 42.00 18.30 444718 SMO 2018 05 23 01 38 00 5217-99 G co CCGG 52.470 -999.990 ... V2 2018 06 07 14 01 00 -14.2474 -170.5644 47.00 42.00 5.00 444706 SMO 2018 05 23 01 38 00 5636-99 G co CCGG 52.490 -999.990 ... V2 2018 06 07 14 17 00 -14.2474 -170.5644 47.00 42.00 5.00 444705 SMO 2018 06 01 22 35 00 4922-99 S co CCGG 53.570 -999.990 ... V2 2018 06 19 13 32 00 -14.2474 -170.5644 60.30 42.00 18.30 445249 SMO 2018 06 01 22 35 00 574-99 S co CCGG 54.640 -999.990 ... V2 2018 06 19 13 16 00 -14.2474 -170.5644 60.30 42.00 18.30 445250 SMO 2018 06 01 23 14 00 4100-99 G co CCGG 54.120 -999.990 ... V2 2018 06 19 13 00 00 -14.2474 -170.5644 47.00 42.00 5.00 445248 SMO 2018 06 01 23 14 00 430-99 G co CCGG 53.860 -999.990 ... V2 2018 06 19 12 45 00 -14.2474 -170.5644 47.00 42.00 5.00 445247 SMO 2018 06 08 01 57 00 1940-99 G co CCGG 55.370 -999.990 ... V2 2018 08 10 16 18 00 -14.2474 -170.5644 47.00 42.00 5.00 447257 SMO 2018 06 08 01 57 00 3991-99 G co CCGG 55.290 -999.990 ... V2 2018 08 10 16 33 00 -14.2474 -170.5644 47.00 42.00 5.00 447258 SMO 2018 06 08 02 25 00 1310-99 S co CCGG 54.740 -999.990 ... V2 2018 08 10 17 05 00 -14.2474 -170.5644 60.30 42.00 18.30 447255 SMO 2018 06 08 02 25 00 872-99 S co CCGG 55.920 -999.990 ... V2 2018 08 10 16 49 00 -14.2474 -170.5644 60.30 42.00 18.30 447256 SMO 2018 06 16 00 14 00 5335-99 G co CCGG 53.710 -999.990 ... V2 2018 07 03 12 21 00 -14.2474 -170.5644 47.00 42.00 5.00 445912 SMO 2018 06 16 00 14 00 5861-99 G co CCGG 53.200 -999.990 ... V2 2018 07 03 12 37 00 -14.2474 -170.5644 47.00 42.00 5.00 445913 SMO 2018 06 16 00 44 00 4765-99 S co CCGG 54.820 -999.990 ... V2 2018 07 03 11 50 00 -14.2474 -170.5644 60.30 42.00 18.30 445910 SMO 2018 06 16 00 44 00 5083-99 S co CCGG 54.090 -999.990 ... V2 2018 07 03 12 05 00 -14.2474 -170.5644 60.30 42.00 18.30 445911 SMO 2018 06 21 23 12 00 5453-99 G co CCGG 55.540 -999.990 ... V2 2018 08 10 12 18 00 -14.2474 -170.5644 47.00 42.00 5.00 447265 SMO 2018 06 21 23 12 00 5633-99 G co CCGG 56.060 -999.990 ... V2 2018 08 10 12 03 00 -14.2474 -170.5644 47.00 42.00 5.00 447266 SMO 2018 06 22 02 25 00 1581-99 S co CCGG 57.200 -999.990 ... V2 2018 08 10 12 34 00 -14.2474 -170.5644 60.30 42.00 18.30 447263 SMO 2018 06 22 02 25 00 2413-99 S co CCGG 56.660 -999.990 ... V2 2018 08 10 12 50 00 -14.2474 -170.5644 60.30 42.00 18.30 447264 SMO 2018 06 26 01 35 00 3245-99 S co CCGG 55.430 -999.990 ... V2 2018 07 10 12 23 00 -14.2474 -170.5644 60.30 42.00 18.30 446185 SMO 2018 06 26 01 35 00 4105-99 S co CCGG 55.250 -999.990 ... V2 2018 07 10 12 39 00 -14.2474 -170.5644 60.30 42.00 18.30 446186 SMO 2018 06 26 02 10 00 4849-99 G co CCGG 54.890 -999.990 ... V2 2018 07 11 09 51 00 -14.2474 -170.5644 47.00 42.00 5.00 446183 SMO 2018 06 26 02 10 00 4910-99 G co CCGG 54.080 -999.990 ... V2 2018 07 11 10 07 00 -14.2474 -170.5644 47.00 42.00 5.00 446184 SMO 2018 07 06 23 35 00 1909-99 S co CCGG 57.990 -999.990 ... V2 2018 07 24 10 41 00 -14.2474 -170.5644 60.30 42.00 18.30 446591 SMO 2018 07 06 23 35 00 4079-99 S co CCGG 57.450 -999.990 ... V2 2018 07 24 10 57 00 -14.2474 -170.5644 60.30 42.00 18.30 446592 SMO 2018 07 07 00 21 00 3773-99 G co CCGG 57.290 -999.990 ... V2 2018 07 20 17 13 00 -14.2474 -170.5644 47.00 42.00 5.00 446537 SMO 2018 07 07 00 21 00 5574-99 G co CCGG 57.410 -999.990 ... V2 2018 07 20 17 29 00 -14.2474 -170.5644 47.00 42.00 5.00 446538 SMO 2018 07 10 23 35 00 198-99 S co CCGG 58.440 -999.990 ... V2 2018 07 30 16 26 00 -14.2474 -170.5644 60.30 42.00 18.30 446876 SMO 2018 07 10 23 35 00 735-99 S co CCGG 58.990 -999.990 ... V2 2018 07 30 16 42 00 -14.2474 -170.5644 60.30 42.00 18.30 446877 SMO 2018 07 11 00 47 00 2188-99 G co CCGG 57.700 -999.990 ... V2 2018 07 30 17 13 00 -14.2474 -170.5644 47.00 42.00 5.00 446874 SMO 2018 07 11 00 47 00 2205-99 G co CCGG 57.830 -999.990 ... V2 2018 07 30 16 58 00 -14.2474 -170.5644 47.00 42.00 5.00 446875 SMO 2018 07 21 03 36 00 1087-99 S co CCGG 55.480 -999.990 ... V2 2018 08 10 10 59 00 -14.2474 -170.5644 60.30 42.00 18.30 447260 SMO 2018 07 21 03 36 00 3347-99 S co CCGG 61.230 -999.990 N.. V2 2018 08 10 11 14 00 -14.2474 -170.5644 60.30 42.00 18.30 447259 SMO 2018 07 21 04 15 00 2019-99 G co CCGG 54.250 -999.990 ... V2 2018 08 10 11 31 00 -14.2474 -170.5644 47.00 42.00 5.00 447262 SMO 2018 07 21 04 15 00 3513-99 G co CCGG 54.870 -999.990 ... V2 2018 08 10 11 47 00 -14.2474 -170.5644 47.00 42.00 5.00 447261 SMO 2018 07 26 22 40 00 4357-99 S co CCGG 54.690 -999.990 ... V2 2018 08 21 15 02 00 -14.2474 -170.5644 60.30 42.00 18.30 447819 SMO 2018 07 26 22 40 00 821-99 S co CCGG 55.070 -999.990 ... V2 2018 08 21 14 46 00 -14.2474 -170.5644 60.30 42.00 18.30 447820 SMO 2018 07 26 23 30 00 1233-99 G co CCGG 55.680 -999.990 ... V2 2018 08 17 12 53 00 -14.2474 -170.5644 47.00 42.00 5.00 447591 SMO 2018 07 26 23 30 00 4450-99 G co CCGG 52.020 -999.990 ... V2 2018 08 17 13 08 00 -14.2474 -170.5644 47.00 42.00 5.00 447592 SMO 2018 08 04 01 05 00 1155-99 G co CCGG 53.900 -999.990 ... V2 2018 08 30 11 10 00 -14.2474 -170.5644 47.00 42.00 5.00 448287 SMO 2018 08 04 01 05 00 3468-99 G co CCGG 53.830 -999.990 ... V2 2018 08 30 11 26 00 -14.2474 -170.5644 47.00 42.00 5.00 448288 SMO 2018 08 04 02 36 00 2516-99 S co CCGG 55.000 -999.990 ... V2 2018 08 30 11 42 00 -14.2474 -170.5644 60.30 42.00 18.30 448289 SMO 2018 08 04 02 36 00 4045-99 S co CCGG 54.720 -999.990 ... V2 2018 08 30 11 58 00 -14.2474 -170.5644 60.30 42.00 18.30 448290 SMO 2018 08 11 01 02 00 1236-99 G co CCGG 61.360 -999.990 ... V2 2018 09 04 14 26 00 -14.2474 -170.5644 47.00 42.00 5.00 448573 SMO 2018 08 11 01 02 00 2825-99 G co CCGG 61.770 -999.990 ... V2 2018 09 04 14 41 00 -14.2474 -170.5644 47.00 42.00 5.00 448574 SMO 2018 08 11 01 39 00 1582-99 S co CCGG 60.770 -999.990 ... V2 2018 09 04 15 13 00 -14.2474 -170.5644 60.30 42.00 18.30 448575 SMO 2018 08 11 01 39 00 337-99 S co CCGG 61.070 -999.990 ... V2 2018 09 04 14 57 00 -14.2474 -170.5644 60.30 42.00 18.30 448576 SMO 2018 08 14 23 36 00 3258-99 S co CCGG 57.440 -999.990 ... V2 2018 09 13 14 04 00 -14.2474 -170.5644 60.30 42.00 18.30 448773 SMO 2018 08 14 23 36 00 690-99 S co CCGG 57.730 -999.990 ... V2 2018 09 13 13 48 00 -14.2474 -170.5644 60.30 42.00 18.30 448774 SMO 2018 08 15 00 37 00 4131-99 G co CCGG 64.460 -999.990 N.. V2 2018 09 13 15 39 00 -14.2474 -170.5644 47.00 42.00 5.00 448776 SMO 2018 08 15 00 37 00 704-99 G co CCGG 57.160 -999.990 ... V2 2018 09 13 15 23 00 -14.2474 -170.5644 47.00 42.00 5.00 448775 SMO 2018 08 20 22 35 00 1469-99 S co CCGG 54.630 -999.990 ... V2 2018 09 13 15 55 00 -14.2474 -170.5644 60.30 42.00 18.30 448777 SMO 2018 08 20 22 35 00 5420-99 S co CCGG 54.410 -999.990 ... V2 2018 09 13 16 10 00 -14.2474 -170.5644 60.30 42.00 18.30 448778 SMO 2018 08 21 00 12 00 3185-99 G co CCGG 54.560 -999.990 ... V2 2018 09 13 16 42 00 -14.2474 -170.5644 47.00 42.00 5.00 448779 SMO 2018 08 21 00 12 00 907-99 G co CCGG 54.390 -999.990 ... V2 2018 09 13 16 26 00 -14.2474 -170.5644 47.00 42.00 5.00 448780 SMO 2018 08 30 21 36 00 225-99 S co CCGG 60.450 -999.990 ... V2 2018 09 21 10 42 00 -14.2474 -170.5644 60.30 42.00 18.30 449326 SMO 2018 08 30 21 36 00 391-99 S co CCGG 59.950 -999.990 ... V2 2018 09 21 10 58 00 -14.2474 -170.5644 60.30 42.00 18.30 449327 SMO 2018 08 31 00 35 00 1181-99 G co CCGG 60.360 -999.990 ... V2 2018 09 21 12 08 00 -14.2474 -170.5644 47.00 42.00 5.00 449324 SMO 2018 08 31 00 35 00 2191-99 G co CCGG 60.030 -999.990 ... V2 2018 09 21 12 24 00 -14.2474 -170.5644 47.00 42.00 5.00 449325 SMO 2018 09 06 23 36 00 3458-99 S co CCGG 67.000 -999.990 ... V2 2018 09 24 13 18 00 -14.2474 -170.5644 60.30 42.00 18.30 449322 SMO 2018 09 06 23 36 00 4896-99 S co CCGG 66.820 -999.990 ... V2 2018 09 24 13 34 00 -14.2474 -170.5644 60.30 42.00 18.30 449323 SMO 2018 09 07 01 00 00 3990-99 G co CCGG 66.450 -999.990 ... V2 2018 09 24 12 46 00 -14.2474 -170.5644 47.00 42.00 5.00 449320 SMO 2018 09 07 01 00 00 4309-99 G co CCGG 66.460 -999.990 ... V2 2018 09 24 13 02 00 -14.2474 -170.5644 47.00 42.00 5.00 449321 SMO 2018 09 14 21 35 00 4351-99 S co CCGG 57.990 -999.990 ... V2 2018 10 02 11 34 00 -14.2474 -170.5644 60.30 42.00 18.30 449704 SMO 2018 09 14 21 35 00 4603-99 S co CCGG 59.570 -999.990 ... V2 2018 10 02 11 50 00 -14.2474 -170.5644 60.30 42.00 18.30 449705 SMO 2018 09 14 22 46 00 1163-99 G co CCGG 62.980 -999.990 A.. V2 2018 10 02 12 22 00 -14.2474 -170.5644 47.00 42.00 5.00 449703 SMO 2018 09 14 22 46 00 960-99 G co CCGG 58.460 -999.990 ... V2 2018 10 02 12 06 00 -14.2474 -170.5644 47.00 42.00 5.00 449702 SMO 2018 09 20 22 35 00 1516-99 S co CCGG 64.410 -999.990 ... V2 2018 10 09 11 18 00 -14.2474 -170.5644 60.30 42.00 18.30 449881 SMO 2018 09 20 22 35 00 606-99 S co CCGG 64.560 -999.990 ... V2 2018 10 09 11 02 00 -14.2474 -170.5644 60.30 42.00 18.30 449882 SMO 2018 09 21 00 26 00 2076-99 G co CCGG 62.930 -999.990 ... V2 2018 10 09 16 34 00 -14.2474 -170.5644 47.00 42.00 5.00 449867 SMO 2018 09 25 01 35 00 1786-99 S co CCGG 65.760 -999.990 ... V2 2018 10 17 15 11 00 -14.2474 -170.5644 60.30 42.00 18.30 450262 SMO 2018 09 25 01 35 00 5329-99 S co CCGG 65.140 -999.990 ... V2 2018 10 17 15 27 00 -14.2474 -170.5644 60.30 42.00 18.30 450263 SMO 2018 09 25 02 11 00 3186-99 G co CCGG 65.840 -999.990 ... V2 2018 10 17 15 58 00 -14.2474 -170.5644 47.00 42.00 5.00 450261 SMO 2018 09 25 02 11 00 768-99 G co CCGG 66.400 -999.990 ... V2 2018 10 17 15 43 00 -14.2474 -170.5644 47.00 42.00 5.00 450260 SMO 2018 10 05 01 35 00 1016-99 S co CCGG 63.700 -999.990 ... V2 2018 10 25 15 40 00 -14.2474 -170.5644 60.30 42.00 18.30 450587 SMO 2018 10 05 01 35 00 490-99 S co CCGG 65.230 -999.990 ... V2 2018 10 25 15 25 00 -14.2474 -170.5644 60.30 42.00 18.30 450588 SMO 2018 10 05 02 10 00 2254-99 G co CCGG 61.530 -999.990 ... V2 2018 10 25 14 53 00 -14.2474 -170.5644 47.00 42.00 5.00 450586 SMO 2018 10 05 02 10 00 5010-99 G co CCGG 63.690 -999.990 ... V2 2018 10 25 15 09 00 -14.2474 -170.5644 47.00 42.00 5.00 450585 SMO 2018 10 12 01 23 00 4899-99 G co CCGG 61.150 -999.990 ... V2 2018 10 29 16 20 00 -14.2474 -170.5644 47.00 42.00 5.00 450747 SMO 2018 10 12 01 23 00 579-99 G co CCGG 62.210 -999.990 ... V2 2018 10 29 16 04 00 -14.2474 -170.5644 47.00 42.00 5.00 450748 SMO 2018 10 12 03 35 00 1848-99 S co CCGG 62.110 -999.990 ... V2 2018 10 29 16 36 00 -14.2474 -170.5644 60.30 42.00 18.30 450749 SMO 2018 10 12 03 35 00 3246-99 S co CCGG 62.540 -999.990 ... V2 2018 10 29 16 51 00 -14.2474 -170.5644 60.30 42.00 18.30 450750 SMO 2018 10 16 23 35 00 1153-99 S co CCGG 59.430 -999.990 ... V2 2018 10 29 15 01 00 -14.2474 -170.5644 60.30 42.00 18.30 450743 SMO 2018 10 16 23 35 00 5111-99 S co CCGG 59.920 -999.990 ... V2 2018 10 29 15 17 00 -14.2474 -170.5644 60.30 42.00 18.30 450744 SMO 2018 10 17 00 12 00 1640-99 G co CCGG 60.810 -999.990 ... V2 2018 10 29 15 32 00 -14.2474 -170.5644 47.00 42.00 5.00 450745 SMO 2018 10 17 00 12 00 3526-99 G co CCGG 61.440 -999.990 ... V2 2018 10 29 15 48 00 -14.2474 -170.5644 47.00 42.00 5.00 450746 SMO 2018 10 26 03 38 00 2456-99 S co CCGG 62.650 -999.990 ... V2 2018 11 28 09 21 00 -14.2474 -170.5644 60.30 42.00 18.30 451726 SMO 2018 10 26 03 38 00 4396-99 S co CCGG 60.310 -999.990 ... V2 2018 11 28 09 36 00 -14.2474 -170.5644 60.30 42.00 18.30 451727 SMO 2018 11 02 21 39 00 1221-99 S co CCGG 59.420 -999.990 ... V2 2018 11 21 11 54 00 -14.2474 -170.5644 60.30 42.00 18.30 451616 SMO 2018 11 02 21 39 00 5449-99 S co CCGG 58.890 -999.990 ... V2 2018 11 21 12 10 00 -14.2474 -170.5644 60.30 42.00 18.30 451617 SMO 2018 11 02 23 53 00 4718-99 G co CCGG 63.010 -999.990 ... V2 2018 11 21 11 22 00 -14.2474 -170.5644 47.00 42.00 5.00 451619 SMO 2018 11 02 23 53 00 5009-99 G co CCGG 60.940 -999.990 ... V2 2018 11 21 11 38 00 -14.2474 -170.5644 47.00 42.00 5.00 451618 SMO 2018 11 08 22 39 00 3334-99 S co CCGG 62.750 -999.990 ... V2 2018 12 10 10 03 00 -14.2474 -170.5644 60.30 42.00 18.30 452074 SMO 2018 11 08 22 39 00 3640-99 S co CCGG 62.310 -999.990 ... V2 2018 12 10 10 19 00 -14.2474 -170.5644 60.30 42.00 18.30 452075 SMO 2018 11 09 02 47 00 2262-99 G co CCGG 61.160 -999.990 ... V2 2018 12 07 16 09 00 -14.2474 -170.5644 47.00 42.00 5.00 452076 SMO 2018 11 09 02 47 00 4672-99 G co CCGG 60.830 -999.990 ... V2 2018 12 07 16 25 00 -14.2474 -170.5644 47.00 42.00 5.00 452077 SMO 2018 11 16 22 40 00 54-99 S co CCGG 58.050 -999.990 ... V2 2018 12 17 13 23 00 -14.2474 -170.5644 60.30 42.00 18.30 452658 SMO 2018 11 16 22 40 00 5827-99 S co CCGG 58.470 -999.990 ... V2 2018 12 17 13 39 00 -14.2474 -170.5644 60.30 42.00 18.30 452659 SMO 2018 11 16 23 30 00 553-99 G co CCGG 58.360 -999.990 ... V2 2018 12 17 12 20 00 -14.2474 -170.5644 47.00 42.00 5.00 452660 SMO 2018 11 16 23 30 00 5858-99 G co CCGG 58.780 -999.990 ... V2 2018 12 17 12 35 00 -14.2474 -170.5644 47.00 42.00 5.00 452661 SMO 2018 11 20 01 45 00 1299-99 G co CCGG 57.700 -999.990 ... V2 2019 01 16 14 05 00 -14.2474 -170.5644 47.00 42.00 5.00 453031 SMO 2018 11 20 01 45 00 1681-99 G co CCGG 57.600 -999.990 ... V2 2019 01 16 13 50 00 -14.2474 -170.5644 47.00 42.00 5.00 453032 SMO 2018 11 20 22 44 00 2561-99 S co CCGG 57.420 -999.990 ... V2 2019 01 16 14 37 00 -14.2474 -170.5644 60.30 42.00 18.30 453034 SMO 2018 11 20 22 44 00 575-99 S co CCGG 57.060 -999.990 ... V2 2019 01 16 14 21 00 -14.2474 -170.5644 60.30 42.00 18.30 453033 SMO 2018 11 30 23 35 00 3283-99 S co CCGG 142.380 -999.990 A.. V2 2019 01 16 15 24 00 -14.2474 -170.5644 60.30 42.00 18.30 453037 SMO 2018 11 30 23 35 00 3283-99 S co CCGG 58.650 -999.990 ... V2 2019 01 16 16 59 00 -14.2474 -170.5644 60.30 42.00 18.30 453037 SMO 2018 11 30 23 35 00 4837-99 S co CCGG 142.310 -999.990 A.. V2 2019 01 16 15 40 00 -14.2474 -170.5644 60.30 42.00 18.30 453038 SMO 2018 11 30 23 35 00 4837-99 S co CCGG 57.580 -999.990 ... V2 2019 01 16 17 15 00 -14.2474 -170.5644 60.30 42.00 18.30 453038 SMO 2018 12 01 00 21 00 2213-99 G co CCGG 58.550 -999.990 ... V2 2019 01 16 14 53 00 -14.2474 -170.5644 47.00 42.00 5.00 453035 SMO 2018 12 01 00 21 00 3819-99 G co CCGG 128.400 -999.990 A.. V2 2019 01 16 15 09 00 -14.2474 -170.5644 47.00 42.00 5.00 453036 SMO 2018 12 01 00 21 00 3819-99 G co CCGG 59.760 -999.990 ... V2 2019 01 16 18 34 00 -14.2474 -170.5644 47.00 42.00 5.00 453036 SMO 2018 12 06 23 40 00 2901-99 S co CCGG 59.650 -999.990 ... V2 2019 01 24 12 11 00 -14.2474 -170.5644 60.30 42.00 18.30 453482 SMO 2018 12 06 23 40 00 5525-99 S co CCGG 57.920 -999.990 ... V2 2019 01 24 12 27 00 -14.2474 -170.5644 60.30 42.00 18.30 453483 SMO 2018 12 07 01 35 00 1267-99 G co CCGG 57.620 -999.990 ... V2 2019 01 24 11 55 00 -14.2474 -170.5644 47.00 42.00 5.00 453485 SMO 2018 12 07 01 35 00 446-99 G co CCGG 57.620 -999.990 ... V2 2019 01 24 11 39 00 -14.2474 -170.5644 47.00 42.00 5.00 453484 SMO 2018 12 14 00 28 00 4442-99 S co CCGG 55.340 -999.990 ... V2 2019 01 23 12 03 00 -14.2474 -170.5644 60.30 42.00 18.30 453365 SMO 2018 12 14 00 28 00 5470-99 S co CCGG 55.720 -999.990 ... V2 2019 01 23 12 19 00 -14.2474 -170.5644 60.30 42.00 18.30 453366 SMO 2018 12 14 02 37 00 432-99 G co CCGG 55.930 -999.990 ... V2 2019 01 23 11 32 00 -14.2474 -170.5644 47.00 42.00 5.00 453363 SMO 2018 12 14 02 37 00 4447-99 G co CCGG 55.660 -999.990 ... V2 2019 01 23 11 47 00 -14.2474 -170.5644 47.00 42.00 5.00 453364 SMO 2018 12 21 20 38 00 2604-99 S co CCGG 51.640 -999.990 ... V2 2019 01 28 12 34 00 -14.2474 -170.5644 60.30 42.00 18.30 453465 SMO 2018 12 21 20 38 00 930-99 S co CCGG 52.340 -999.990 ... V2 2019 01 28 12 18 00 -14.2474 -170.5644 60.30 42.00 18.30 453464 SMO 2018 12 22 00 42 00 1074-99 G co CCGG 53.230 -999.990 ... V2 2019 01 28 11 46 00 -14.2474 -170.5644 47.00 42.00 5.00 453462 SMO 2018 12 22 00 42 00 2553-99 G co CCGG 53.150 -999.990 ... V2 2019 01 28 12 02 00 -14.2474 -170.5644 47.00 42.00 5.00 453463 SMO 2018 12 28 22 26 00 1130-99 S co CCGG 59.260 -999.990 ... V2 2019 01 28 14 56 00 -14.2474 -170.5644 60.30 42.00 18.30 453420 SMO 2018 12 28 22 26 00 2616-99 S co CCGG 59.440 -999.990 ... V2 2019 01 28 15 12 00 -14.2474 -170.5644 60.30 42.00 18.30 453421 SMO 2018 12 28 23 26 00 3218-99 G co CCGG 60.920 -999.990 ... V2 2019 01 28 15 44 00 -14.2474 -170.5644 47.00 42.00 5.00 453419 SMO 2018 12 28 23 26 00 391-99 G co CCGG 60.220 -999.990 ... V2 2019 01 28 15 28 00 -14.2474 -170.5644 47.00 42.00 5.00 453418 SMO 2019 01 04 02 36 00 2753-99 S co CCGG 63.330 -999.990 ... V2 2019 02 07 10 57 00 -14.2474 -170.5644 60.30 42.00 18.30 453976 SMO 2019 01 04 02 36 00 571-99 S co CCGG 63.250 -999.990 ... V2 2019 02 07 10 41 00 -14.2474 -170.5644 60.30 42.00 18.30 453977 SMO 2019 01 04 05 45 00 472-99 G co CCGG 62.650 -999.990 ... V2 2019 02 06 11 52 00 -14.2474 -170.5644 47.00 42.00 5.00 453974 SMO 2019 01 04 05 45 00 5356-99 G co CCGG 62.590 -999.990 ... V2 2019 02 06 12 07 00 -14.2474 -170.5644 47.00 42.00 5.00 453975 SMO 2019 01 11 02 15 00 1516-99 G co CCGG 58.320 -999.990 ... V2 2019 02 13 09 51 00 -14.2474 -170.5644 47.00 42.00 5.00 453980 SMO 2019 01 11 02 15 00 1844-99 G co CCGG 59.550 -999.990 ... V2 2019 02 13 10 06 00 -14.2474 -170.5644 47.00 42.00 5.00 453981 SMO 2019 01 11 22 35 00 254-99 S co CCGG 57.200 -999.990 ... V2 2019 02 13 10 22 00 -14.2474 -170.5644 60.30 42.00 18.30 453978 SMO 2019 01 11 22 35 00 3434-99 S co CCGG 57.480 -999.990 ... V2 2019 02 13 10 38 00 -14.2474 -170.5644 60.30 42.00 18.30 453979 SMO 2019 01 18 23 36 00 2093-99 S co CCGG 57.240 -999.990 ... V2 2019 02 19 12 01 00 -14.2474 -170.5644 60.30 42.00 18.30 454435 SMO 2019 01 18 23 36 00 2880-99 S co CCGG 56.840 -999.990 ... V2 2019 02 19 12 16 00 -14.2474 -170.5644 60.30 42.00 18.30 454436 SMO 2019 01 19 00 35 00 3096-99 G co CCGG 57.490 -999.990 ... V2 2019 02 19 10 57 00 -14.2474 -170.5644 47.00 42.00 5.00 454437 SMO 2019 01 19 00 35 00 5723-99 G co CCGG 55.580 -999.990 ... V2 2019 02 19 11 13 00 -14.2474 -170.5644 47.00 42.00 5.00 454438 SMO 2019 01 26 00 37 00 1380-99 S co CCGG 65.560 -999.990 ... V2 2019 03 05 10 21 00 -14.2474 -170.5644 60.30 42.00 18.30 454896 SMO 2019 01 26 00 37 00 4410-99 S co CCGG 64.630 -999.990 ... V2 2019 03 05 10 36 00 -14.2474 -170.5644 60.30 42.00 18.30 454897 SMO 2019 01 26 01 45 00 4351-99 G co CCGG 61.770 -999.990 ... V2 2019 02 28 13 37 00 -14.2474 -170.5644 47.00 42.00 5.00 454945 SMO 2019 01 26 01 45 00 4603-99 G co CCGG 61.610 -999.990 ... V2 2019 02 28 13 53 00 -14.2474 -170.5644 47.00 42.00 5.00 454946 SMO 2019 02 01 02 20 00 1906-99 G co CCGG 51.060 -999.990 ... V2 2019 03 05 09 49 00 -14.2474 -170.5644 47.00 42.00 5.00 454892 SMO 2019 02 01 02 20 00 3778-99 G co CCGG 51.150 -999.990 ... V2 2019 03 05 10 05 00 -14.2474 -170.5644 47.00 42.00 5.00 454893 SMO 2019 02 01 03 38 00 4617-99 S co CCGG 51.260 -999.990 ... V2 2019 03 05 09 17 00 -14.2474 -170.5644 60.30 42.00 18.30 454894 SMO 2019 02 01 03 38 00 4957-99 S co CCGG 50.590 -999.990 ... V2 2019 03 05 09 33 00 -14.2474 -170.5644 60.30 42.00 18.30 454895 SMO 2019 02 08 22 35 00 1250-99 S co CCGG 56.410 -999.990 ... V2 2019 03 14 12 19 00 -14.2474 -170.5644 60.30 42.00 18.30 455605 SMO 2019 02 08 22 35 00 5464-99 S co CCGG 56.100 -999.990 ... V2 2019 03 14 12 35 00 -14.2474 -170.5644 60.30 42.00 18.30 455606 SMO 2019 02 08 23 50 00 2245-99 G co CCGG 57.610 -999.990 ... V2 2019 03 14 11 47 00 -14.2474 -170.5644 47.00 42.00 5.00 455607 SMO 2019 02 08 23 50 00 72-99 G co CCGG 57.680 -999.990 ... V2 2019 03 14 12 03 00 -14.2474 -170.5644 47.00 42.00 5.00 455608 SMO 2019 02 15 00 39 00 1153-99 S co CCGG 60.990 -999.990 ... V2 2019 03 14 10 44 00 -14.2474 -170.5644 60.30 42.00 18.30 455611 SMO 2019 02 15 00 39 00 2141-99 S co CCGG 61.470 -999.990 ... V2 2019 03 14 11 00 00 -14.2474 -170.5644 60.30 42.00 18.30 455612 SMO 2019 02 15 02 40 00 1336-99 G co CCGG 63.290 -999.990 ... V2 2019 03 14 11 32 00 -14.2474 -170.5644 47.00 42.00 5.00 455610 SMO 2019 02 15 02 40 00 379-99 G co CCGG 63.410 -999.990 ... V2 2019 03 14 11 16 00 -14.2474 -170.5644 47.00 42.00 5.00 455609 SMO 2019 02 22 23 38 00 2097-99 S co CCGG 57.300 -999.990 ... V2 2019 03 12 16 45 00 -14.2474 -170.5644 60.30 42.00 18.30 455589 SMO 2019 02 22 23 38 00 2794-99 S co CCGG 56.510 -999.990 ... V2 2019 03 12 17 01 00 -14.2474 -170.5644 60.30 42.00 18.30 455590 SMO 2019 02 23 02 44 00 3622-99 G co CCGG 55.410 -999.990 ... V2 2019 03 11 12 47 00 -14.2474 -170.5644 47.00 42.00 5.00 455553 SMO 2019 02 23 02 44 00 4254-99 G co CCGG 55.440 -999.990 ... V2 2019 03 11 13 02 00 -14.2474 -170.5644 47.00 42.00 5.00 455554 SMO 2019 03 01 23 40 00 2642-99 S co CCGG 55.790 -999.990 ... V2 2019 03 26 12 18 00 -14.2474 -170.5644 60.30 42.00 18.30 456112 SMO 2019 03 01 23 40 00 4904-99 S co CCGG 56.260 -999.990 ... V2 2019 03 26 12 34 00 -14.2474 -170.5644 60.30 42.00 18.30 456113 SMO 2019 03 02 03 30 00 1631-99 G co CCGG 58.810 -999.990 ... V2 2019 03 26 11 15 00 -14.2474 -170.5644 47.00 42.00 5.00 456114 SMO 2019 03 02 03 30 00 853-99 G co CCGG 58.410 -999.990 ... V2 2019 03 26 10 59 00 -14.2474 -170.5644 47.00 42.00 5.00 456115 SMO 2019 03 07 21 35 00 3768-99 S co CCGG 54.830 -999.990 ... V2 2019 03 26 10 28 00 -14.2474 -170.5644 60.30 42.00 18.30 456110 SMO 2019 03 07 21 35 00 3961-99 S co CCGG 54.120 -999.990 ... V2 2019 03 26 10 43 00 -14.2474 -170.5644 60.30 42.00 18.30 456111 SMO 2019 03 07 22 20 00 4990-99 G co CCGG 54.310 -999.990 ... V2 2019 03 26 14 25 00 -14.2474 -170.5644 47.00 42.00 5.00 456096 SMO 2019 03 07 22 20 00 5402-99 G co CCGG 53.860 -999.990 ... V2 2019 03 26 14 40 00 -14.2474 -170.5644 47.00 42.00 5.00 456097 SMO 2019 03 13 22 48 00 2572-99 S co CCGG 52.840 -999.990 ... V2 2019 06 05 17 16 00 -14.2474 -170.5644 60.30 42.00 18.30 459382 SMO 2019 03 13 22 48 00 5369-99 S co CCGG 52.050 -999.990 ... V2 2019 06 05 17 01 00 -14.2474 -170.5644 60.30 42.00 18.30 459381 SMO 2019 03 14 00 07 00 4190-99 G co CCGG 51.640 -999.990 ... V2 2019 06 06 09 38 00 -14.2474 -170.5644 47.00 42.00 5.00 459377 SMO 2019 03 14 00 07 00 5450-99 G co CCGG 51.510 -999.990 ... V2 2019 06 06 09 54 00 -14.2474 -170.5644 47.00 42.00 5.00 459378 SMO 2019 03 22 21 25 00 1411-99 G co CCGG 57.730 -999.990 ... V2 2019 04 29 10 48 00 -14.2474 -170.5644 47.00 42.00 5.00 457240 SMO 2019 03 22 21 25 00 4661-99 G co CCGG 56.090 -999.990 ... V2 2019 04 29 11 03 00 -14.2474 -170.5644 47.00 42.00 5.00 457241 SMO 2019 03 22 22 41 00 198-99 S co CCGG 54.470 -999.990 ... V2 2019 04 29 11 19 00 -14.2474 -170.5644 60.30 42.00 18.30 457242 SMO 2019 03 22 22 41 00 5550-99 S co CCGG 53.130 -999.990 ... V2 2019 04 29 11 35 00 -14.2474 -170.5644 60.30 42.00 18.30 457243 SMO 2019 03 31 03 29 00 2439-99 G co CCGG 55.980 -999.990 ... V2 2019 05 09 12 59 00 -14.2474 -170.5644 47.00 42.00 5.00 457861 SMO 2019 03 31 03 29 00 4123-99 G co CCGG 55.780 -999.990 ... V2 2019 05 09 13 15 00 -14.2474 -170.5644 47.00 42.00 5.00 457862 SMO 2019 04 01 00 52 00 2280-99 S co CCGG 57.300 -999.990 ... V2 2019 05 09 13 30 00 -14.2474 -170.5644 60.30 42.00 18.30 457863 SMO 2019 04 01 00 52 00 2686-99 S co CCGG 56.650 -999.990 ... V2 2019 05 09 13 46 00 -14.2474 -170.5644 60.30 42.00 18.30 457864 SMO 2019 04 05 23 38 00 1893-99 S co CCGG 73.340 -999.990 .X. V2 2019 05 09 14 18 00 -14.2474 -170.5644 60.30 42.00 18.30 457867 SMO 2019 04 05 23 38 00 258-99 S co CCGG 73.290 -999.990 .X. V2 2019 05 09 14 02 00 -14.2474 -170.5644 60.30 42.00 18.30 457868 SMO 2019 04 06 01 40 00 1271-99 G co CCGG 73.670 -999.990 .X. V2 2019 05 09 12 43 00 -14.2474 -170.5644 47.00 42.00 5.00 457865 SMO 2019 04 06 01 40 00 76-99 G co CCGG 75.920 -999.990 .X. V2 2019 05 09 12 27 00 -14.2474 -170.5644 47.00 42.00 5.00 457866 SMO 2019 04 12 23 39 00 28-99 S co CCGG 48.040 -999.990 ... V2 2019 05 10 15 11 00 -14.2474 -170.5644 60.30 42.00 18.30 458231 SMO 2019 04 12 23 39 00 4073-99 S co CCGG 48.600 -999.990 ... V2 2019 05 10 15 27 00 -14.2474 -170.5644 60.30 42.00 18.30 458232 SMO 2019 04 13 03 50 00 1063-99 G co CCGG 49.000 -999.990 ... V2 2019 05 10 14 37 00 -14.2474 -170.5644 47.00 42.00 5.00 458230 SMO 2019 04 13 03 50 00 4608-99 G co CCGG 48.200 -999.990 ... V2 2019 05 10 14 52 00 -14.2474 -170.5644 47.00 42.00 5.00 458229 SMO 2019 04 18 23 36 00 5418-99 S co CCGG 52.580 -999.990 ... V2 2019 05 16 10 49 00 -14.2474 -170.5644 60.30 42.00 18.30 458555 SMO 2019 04 18 23 36 00 735-99 S co CCGG 52.940 -999.990 ... V2 2019 05 16 10 33 00 -14.2474 -170.5644 60.30 42.00 18.30 458556 SMO 2019 04 19 00 30 00 1335-99 G co CCGG 53.240 -999.990 ... V2 2019 05 16 11 22 00 -14.2474 -170.5644 47.00 42.00 5.00 458553 SMO 2019 04 19 00 30 00 968-99 G co CCGG 52.830 -999.990 ... V2 2019 05 16 11 06 00 -14.2474 -170.5644 47.00 42.00 5.00 458554 SMO 2019 04 26 19 37 00 437-99 S co CCGG 59.400 -999.990 ... V2 2019 06 06 10 41 00 -14.2474 -170.5644 60.30 42.00 18.30 459384 SMO 2019 04 26 19 37 00 5043-99 S co CCGG 58.780 -999.990 ... V2 2019 06 06 10 57 00 -14.2474 -170.5644 60.30 42.00 18.30 459383 SMO 2019 04 26 20 38 00 3670-99 G co CCGG 58.380 -999.990 ... V2 2019 06 06 10 10 00 -14.2474 -170.5644 47.00 42.00 5.00 459379 SMO 2019 04 26 20 38 00 4080-99 G co CCGG 58.440 -999.990 ... V2 2019 06 06 10 26 00 -14.2474 -170.5644 47.00 42.00 5.00 459380 SMO 2019 05 03 00 37 00 3567-99 S co CCGG 57.870 -999.990 ... V2 2019 06 13 15 20 00 -14.2474 -170.5644 60.30 42.00 18.30 459535 SMO 2019 05 03 00 37 00 4580-99 S co CCGG 58.570 -999.990 ... V2 2019 06 13 15 36 00 -14.2474 -170.5644 60.30 42.00 18.30 459536 SMO 2019 05 03 01 30 00 2977-99 G co CCGG 58.310 -999.990 ... V2 2019 06 13 15 52 00 -14.2474 -170.5644 47.00 42.00 5.00 459537 SMO 2019 05 03 01 30 00 5330-99 G co CCGG 58.950 -999.990 ... V2 2019 06 13 16 08 00 -14.2474 -170.5644 47.00 42.00 5.00 459538 SMO 2019 05 10 20 25 00 5690-99 S co CCGG 51.420 -999.990 ... V2 2019 06 13 16 55 00 -14.2474 -170.5644 60.30 42.00 18.30 459533 SMO 2019 05 10 20 25 00 5893-99 S co CCGG 51.360 -999.990 ... V2 2019 06 13 17 11 00 -14.2474 -170.5644 60.30 42.00 18.30 459534 SMO 2019 05 10 21 15 00 2695-99 G co CCGG 52.800 -999.990 ... V2 2019 06 13 16 24 00 -14.2474 -170.5644 47.00 42.00 5.00 459539 SMO 2019 05 10 21 15 00 3433-99 G co CCGG 52.070 -999.990 ... V2 2019 06 13 16 39 00 -14.2474 -170.5644 47.00 42.00 5.00 459540 SMO 2019 05 17 22 44 00 2526-99 S co CCGG 60.170 -999.990 ... V2 2019 06 21 15 44 00 -14.2474 -170.5644 60.30 42.00 18.30 459986 SMO 2019 05 17 22 44 00 583-99 S co CCGG 60.190 -999.990 ... V2 2019 06 21 15 28 00 -14.2474 -170.5644 60.30 42.00 18.30 459985 SMO 2019 05 18 01 20 00 1324-99 G co CCGG 60.520 -999.990 ... V2 2019 06 21 16 00 00 -14.2474 -170.5644 47.00 42.00 5.00 459983 SMO 2019 05 18 01 20 00 4102-99 G co CCGG 59.610 -999.990 ... V2 2019 06 21 16 15 00 -14.2474 -170.5644 47.00 42.00 5.00 459984 SMO 2019 05 23 00 40 00 259-99 G co CCGG 57.540 -999.990 ... V2 2019 06 21 13 20 00 -14.2474 -170.5644 47.00 42.00 5.00 460098 SMO 2019 05 23 00 40 00 4947-99 G co CCGG 56.960 -999.990 ... V2 2019 06 21 13 36 00 -14.2474 -170.5644 47.00 42.00 5.00 460099 SMO 2019 05 23 02 44 00 3641-99 S co CCGG 57.720 -999.990 ... V2 2019 06 21 13 52 00 -14.2474 -170.5644 60.30 42.00 18.30 460100 SMO 2019 05 23 02 44 00 3659-99 S co CCGG 57.290 -999.990 ... V2 2019 06 21 14 07 00 -14.2474 -170.5644 60.30 42.00 18.30 460101 SMO 2019 05 31 20 46 00 1138-99 G co CCGG 55.400 -999.990 ... V2 2019 06 28 16 13 00 -14.2474 -170.5644 47.00 42.00 5.00 460176 SMO 2019 05 31 20 46 00 5215-99 G co CCGG 55.420 -999.990 ... V2 2019 06 28 16 29 00 -14.2474 -170.5644 47.00 42.00 5.00 460177 SMO 2019 05 31 22 42 00 2621-99 S co CCGG 55.180 -999.990 ... V2 2019 06 28 13 51 00 -14.2474 -170.5644 60.30 42.00 18.30 460175 SMO 2019 05 31 22 42 00 651-99 S co CCGG 54.790 -999.990 ... V2 2019 06 28 13 35 00 -14.2474 -170.5644 60.30 42.00 18.30 460174 SMO 2019 06 04 22 42 00 2852-99 S co CCGG 56.710 -999.990 ... V2 2019 07 03 09 18 00 -14.2474 -170.5644 60.30 42.00 18.30 460443 SMO 2019 06 04 22 42 00 3880-99 S co CCGG 56.810 -999.990 ... V2 2019 07 03 09 34 00 -14.2474 -170.5644 60.30 42.00 18.30 460444 SMO 2019 06 05 01 05 00 3267-99 G co CCGG 55.440 -999.990 ... V2 2019 07 02 16 48 00 -14.2474 -170.5644 47.00 42.00 5.00 460445 SMO 2019 06 05 01 05 00 4695-99 G co CCGG 55.660 -999.990 ... V2 2019 07 02 17 03 00 -14.2474 -170.5644 47.00 42.00 5.00 460446 SMO 2019 06 14 02 25 00 3609-99 G co CCGG 57.800 -999.990 ... V2 2019 07 17 14 45 00 -14.2474 -170.5644 47.00 42.00 5.00 461184 SMO 2019 06 14 02 25 00 574-99 G co CCGG 57.500 -999.990 ... V2 2019 07 17 14 30 00 -14.2474 -170.5644 47.00 42.00 5.00 461183 SMO 2019 06 14 03 25 00 1307-99 S co CCGG 57.640 -999.990 ... V2 2019 07 11 12 52 00 -14.2474 -170.5644 60.30 42.00 18.30 461088 SMO 2019 06 14 03 25 00 1307-99 S co CCGG 61.110 -999.990 A.. V2 2019 07 12 12 52 00 -14.2474 -170.5644 60.30 42.00 18.30 461088 SMO 2019 06 21 21 42 00 2710-99 S co CCGG 57.790 -999.990 ... V2 2019 07 19 10 55 00 -14.2474 -170.5644 60.30 42.00 18.30 461328 SMO 2019 06 21 21 42 00 2828-99 S co CCGG 57.130 -999.990 ... V2 2019 07 19 11 11 00 -14.2474 -170.5644 60.30 42.00 18.30 461329 SMO 2019 06 21 22 40 00 2911-99 G co CCGG 57.370 -999.990 ... V2 2019 07 19 10 23 00 -14.2474 -170.5644 47.00 42.00 5.00 461326 SMO 2019 06 21 22 40 00 5631-99 G co CCGG 57.070 -999.990 ... V2 2019 07 19 10 39 00 -14.2474 -170.5644 47.00 42.00 5.00 461327 SMO 2019 06 28 20 30 00 1154-99 G co CCGG 55.440 -999.990 ... V2 2019 08 01 10 35 00 -14.2474 -170.5644 47.00 42.00 5.00 461679 SMO 2019 06 28 20 30 00 172-99 G co CCGG 55.010 -999.990 ... V2 2019 08 01 10 19 00 -14.2474 -170.5644 47.00 42.00 5.00 461678 SMO 2019 06 28 21 40 00 2390-99 S co CCGG 54.710 -999.990 ... V2 2019 08 01 10 51 00 -14.2474 -170.5644 60.30 42.00 18.30 461677 SMO 2019 06 28 21 40 00 4769-99 S co CCGG 54.890 -999.990 ... V2 2019 08 01 11 07 00 -14.2474 -170.5644 60.30 42.00 18.30 461676 SMO 2019 07 05 22 40 00 1935-99 S co CCGG 56.640 -999.990 ... V2 2019 07 29 15 50 00 -14.2474 -170.5644 60.30 42.00 18.30 462413 SMO 2019 07 05 22 40 00 733-99 S co CCGG 57.280 -999.990 ... V2 2019 07 29 15 34 00 -14.2474 -170.5644 60.30 42.00 18.30 462414 SMO 2019 07 05 23 50 00 1977-99 G co CCGG 56.890 -999.990 ... V2 2019 07 29 16 05 00 -14.2474 -170.5644 47.00 42.00 5.00 462415 SMO 2019 07 05 23 50 00 1978-99 G co CCGG 57.260 -999.990 ... V2 2019 07 29 16 21 00 -14.2474 -170.5644 47.00 42.00 5.00 462416 SMO 2019 07 13 00 10 00 2882-99 S co CCGG 57.450 -999.990 ... AR2 2019 08 08 17 23 37 -14.2474 -170.5644 60.30 42.00 18.30 462822 SMO 2019 07 13 00 10 00 4157-99 S co CCGG 57.330 -999.990 ... AR2 2019 08 08 17 09 20 -14.2474 -170.5644 60.30 42.00 18.30 462823 SMO 2019 07 13 00 56 00 1008-99 G co CCGG 57.230 -999.990 ... AR2 2019 08 08 16 55 04 -14.2474 -170.5644 47.00 42.00 5.00 462668 SMO 2019 07 13 00 56 00 3855-99 G co CCGG 57.010 -999.990 ... AR2 2019 08 08 16 40 47 -14.2474 -170.5644 47.00 42.00 5.00 462669 SMO 2019 07 16 21 43 00 2315-99 S co CCGG 55.960 -999.990 ... AR2 2019 08 08 15 57 49 -14.2474 -170.5644 60.30 42.00 18.30 462896 SMO 2019 07 16 21 43 00 5484-99 S co CCGG 55.920 -999.990 ... AR2 2019 08 08 15 43 34 -14.2474 -170.5644 60.30 42.00 18.30 462897 SMO 2019 07 17 00 15 00 314-99 G co CCGG 54.970 -999.990 ... AR2 2019 08 08 16 12 11 -14.2474 -170.5644 47.00 42.00 5.00 462894 SMO 2019 07 17 00 15 00 5250-99 G co CCGG 55.990 -999.990 ... AR2 2019 08 08 15 29 15 -14.2474 -170.5644 47.00 42.00 5.00 462895 SMO 2019 07 17 00 15 00 5250-99 G co CCGG 55.070 -999.990 ... AR2 2019 08 08 16 26 29 -14.2474 -170.5644 47.00 42.00 5.00 462895 SMO 2019 07 26 00 26 00 3545-99 S co CCGG 56.670 -999.990 ... AR2 2019 08 21 14 20 03 -14.2474 -170.5644 60.30 42.00 18.30 463429 SMO 2019 07 26 00 26 00 5404-99 S co CCGG 56.400 -999.990 ... AR2 2019 08 21 14 34 19 -14.2474 -170.5644 60.30 42.00 18.30 463430 SMO 2019 07 30 22 25 00 4179-99 S co CCGG 57.960 -999.990 ... AR2 2019 08 15 15 49 15 -14.2474 -170.5644 60.30 42.00 18.30 463443 SMO 2019 07 30 22 25 00 5549-99 S co CCGG 57.760 -999.990 ... AR2 2019 08 15 15 34 56 -14.2474 -170.5644 60.30 42.00 18.30 463444 SMO 2019 07 31 00 40 00 4807-99 G co CCGG 58.360 -999.990 ... AR2 2019 08 21 13 51 23 -14.2474 -170.5644 47.00 42.00 5.00 463427 SMO 2019 07 31 00 40 00 4840-99 G co CCGG 58.290 -999.990 ... AR2 2019 08 21 14 05 42 -14.2474 -170.5644 47.00 42.00 5.00 463428 SMO 2019 08 09 22 40 00 107-99 S co CCGG 57.190 -999.990 ... AR2 2019 09 05 11 08 37 -14.2474 -170.5644 60.30 42.00 18.30 464036 SMO 2019 08 09 22 40 00 4399-99 S co CCGG 56.910 -999.990 ... AR2 2019 09 05 10 54 20 -14.2474 -170.5644 60.30 42.00 18.30 464037 SMO 2019 08 09 23 45 00 5021-99 G co CCGG 57.670 -999.990 ... AR2 2019 09 04 15 06 40 -14.2474 -170.5644 47.00 42.00 5.00 464035 SMO 2019 08 09 23 45 00 637-99 G co CCGG 57.830 -999.990 ... AR2 2019 09 04 14 52 23 -14.2474 -170.5644 47.00 42.00 5.00 464034 SMO 2019 08 16 21 42 00 2371-99 S co CCGG 58.180 -999.990 ... AR2 2019 09 18 12 21 04 -14.2474 -170.5644 60.30 42.00 18.30 464574 SMO 2019 08 16 21 42 00 5142-99 S co CCGG 58.170 -999.990 ... AR2 2019 09 18 12 35 23 -14.2474 -170.5644 60.30 42.00 18.30 464575 SMO 2019 08 22 22 36 00 117-99 S co CCGG 58.480 -999.990 ... AR2 2019 09 17 16 46 53 -14.2474 -170.5644 60.30 42.00 18.30 464576 SMO 2019 08 22 22 36 00 1562-99 S co CCGG 57.630 -999.990 ... AR2 2019 09 17 17 01 09 -14.2474 -170.5644 60.30 42.00 18.30 464577 SMO 2019 08 30 00 30 00 1656-99 S co CCGG 63.070 -999.990 ... AR2 2019 10 16 13 17 34 -14.2474 -170.5644 60.30 42.00 18.30 465795 SMO 2019 08 30 00 30 00 2181-99 S co CCGG 62.860 -999.990 ... AR2 2019 10 16 13 03 11 -14.2474 -170.5644 60.30 42.00 18.30 465796 SMO 2019 09 07 23 43 00 3346-99 S co CCGG 65.090 -999.990 ... AR2 2019 10 16 12 48 49 -14.2474 -170.5644 60.30 42.00 18.30 465794 SMO 2019 09 07 23 43 00 783-99 S co CCGG 65.800 -999.990 ... AR2 2019 10 16 12 34 26 -14.2474 -170.5644 60.30 42.00 18.30 465793 SMO 2019 09 13 01 36 00 435-99 S co CCGG 63.940 -999.990 ... AR2 2019 10 30 13 02 41 -14.2474 -170.5644 60.30 42.00 18.30 466694 SMO 2019 09 13 01 36 00 5307-99 S co CCGG 63.630 -999.990 ... AR2 2019 10 30 12 48 21 -14.2474 -170.5644 60.30 42.00 18.30 466693 SMO 2019 09 21 00 39 00 2366-99 S co CCGG 74.170 -999.990 ... AR2 2019 10 30 11 36 57 -14.2474 -170.5644 60.30 42.00 18.30 466657 SMO 2019 09 21 00 39 00 4375-99 S co CCGG 73.770 -999.990 ... AR2 2019 10 30 11 22 38 -14.2474 -170.5644 60.30 42.00 18.30 466656 SMO 2019 09 27 21 36 00 4483-99 S co CCGG 64.350 -999.990 ... AR2 2019 10 31 10 07 35 -14.2474 -170.5644 60.30 42.00 18.30 466962 SMO 2019 09 27 21 36 00 970-99 S co CCGG 64.870 -999.990 ... AR2 2019 10 31 10 21 55 -14.2474 -170.5644 60.30 42.00 18.30 466963 SMO 2019 10 04 21 42 00 4252-99 S co CCGG 69.070 -999.990 N.. AR2 2019 11 14 10 58 17 -14.2474 -170.5644 60.30 42.00 18.30 467051 SMO 2019 10 04 21 42 00 937-99 S co CCGG 75.010 -999.990 N.. AR2 2019 11 14 11 12 39 -14.2474 -170.5644 60.30 42.00 18.30 467052 SMO 2019 10 11 22 40 00 82-99 S co CCGG 66.760 -999.990 ... AR2 2019 11 12 10 00 33 -14.2474 -170.5644 60.30 42.00 18.30 466821 SMO 2019 10 11 22 40 00 992-99 S co CCGG 66.750 -999.990 ... AR2 2019 11 12 09 46 12 -14.2474 -170.5644 60.30 42.00 18.30 466820 SMO 2019 10 17 22 43 00 4397-99 S co CCGG 70.510 -999.990 ... AR2 2019 11 18 14 56 13 -14.2474 -170.5644 60.30 42.00 18.30 467429 SMO 2019 10 17 22 43 00 5369-99 S co CCGG 70.410 -999.990 ... AR2 2019 11 18 15 10 36 -14.2474 -170.5644 60.30 42.00 18.30 467430 SMO 2019 10 22 22 44 00 1307-99 S co CCGG 63.700 -999.990 ... AR2 2019 11 18 14 27 37 -14.2474 -170.5644 60.30 42.00 18.30 467431 SMO 2019 10 22 22 44 00 3709-99 S co CCGG 63.910 -999.990 ... AR2 2019 11 18 14 41 55 -14.2474 -170.5644 60.30 42.00 18.30 467432 SMO 2019 10 29 20 44 00 1029-99 S co CCGG 68.410 -999.990 ... AR2 2019 12 10 11 51 52 -14.2474 -170.5644 60.30 42.00 18.30 468065 SMO 2019 10 29 20 44 00 5788-99 S co CCGG 68.000 -999.990 ... AR2 2019 12 10 12 06 11 -14.2474 -170.5644 60.30 42.00 18.30 468066 SMO 2019 11 09 21 44 00 4195-99 S co CCGG 69.320 -999.990 ... AR2 2019 12 10 11 23 13 -14.2474 -170.5644 60.30 42.00 18.30 468412 SMO 2019 11 09 21 44 00 5407-99 S co CCGG 68.650 -999.990 ... AR2 2019 12 10 11 37 32 -14.2474 -170.5644 60.30 42.00 18.30 468413 SMO 2019 11 15 21 39 00 2407-99 S co CCGG 68.940 -999.990 ... AR2 2020 01 07 13 04 40 -14.2474 -170.5644 60.30 42.00 18.30 468637 SMO 2019 11 15 21 39 00 324-99 S co CCGG 68.410 -999.990 ... AR2 2020 01 07 13 19 01 -14.2474 -170.5644 60.30 42.00 18.30 468638 SMO 2019 11 22 23 41 00 4922-99 S co CCGG 63.120 -999.990 ... AR2 2020 01 07 13 47 41 -14.2474 -170.5644 60.30 42.00 18.30 468639 SMO 2019 11 22 23 41 00 53-99 S co CCGG 64.150 -999.990 ... AR2 2020 01 07 13 33 21 -14.2474 -170.5644 60.30 42.00 18.30 468640 SMO 2019 12 03 20 39 00 417-99 S co CCGG 63.560 -999.990 ... AR2 2020 02 11 16 11 53 -14.2474 -170.5644 60.30 42.00 18.30 470365 SMO 2019 12 03 20 39 00 4670-99 S co CCGG 63.150 -999.990 ... AR2 2020 02 11 16 26 14 -14.2474 -170.5644 60.30 42.00 18.30 470366 SMO 2019 12 13 21 40 00 3667-99 S co CCGG 61.900 -999.990 ... AR2 2020 02 11 15 14 32 -14.2474 -170.5644 60.30 42.00 18.30 470363 SMO 2019 12 13 21 40 00 594-99 S co CCGG 61.980 -999.990 ... AR2 2020 02 11 15 28 52 -14.2474 -170.5644 60.30 42.00 18.30 470364 SMO 2020 01 03 00 19 00 1537-99 S co CCGG 63.990 -999.990 ... AR2 2020 03 05 14 56 34 -14.2474 -170.5644 60.30 42.00 18.30 471498 SMO 2020 01 03 00 19 00 830-99 S co CCGG 63.350 -999.990 ... AR2 2020 03 05 15 10 56 -14.2474 -170.5644 60.30 42.00 18.30 471499 SMO 2020 01 11 00 36 00 4801-99 S co CCGG 64.400 -999.990 ... AR2 2020 03 10 09 27 34 -14.2474 -170.5644 60.30 42.00 18.30 471422 SMO 2020 01 11 00 36 00 4810-99 S co CCGG 64.250 -999.990 ... AR2 2020 03 10 09 41 56 -14.2474 -170.5644 60.30 42.00 18.30 471423 SMO 2020 01 11 01 24 00 320-99 G co CCGG 66.070 -999.990 ... AR2 2020 03 09 16 42 37 -14.2474 -170.5644 47.00 42.00 5.00 471424 SMO 2020 01 11 01 24 00 5293-99 G co CCGG 66.080 -999.990 ... AR2 2020 03 09 16 57 00 -14.2474 -170.5644 47.00 42.00 5.00 471425 SMO 2020 01 17 22 19 00 1744-99 S co CCGG 72.810 -999.990 ... AR2 2020 03 05 15 39 38 -14.2474 -170.5644 60.30 42.00 18.30 471500 SMO 2020 01 17 22 19 00 2074-99 S co CCGG 72.790 -999.990 ... AR2 2020 03 05 15 25 17 -14.2474 -170.5644 60.30 42.00 18.30 471501 SMO 2020 01 17 22 44 00 1425-99 S co CCGG 72.480 -999.990 ... AR2 2020 03 09 15 02 02 -14.2474 -170.5644 60.30 42.00 18.30 471415 SMO 2020 01 17 22 44 00 507-99 S co CCGG 72.290 -999.990 ... AR2 2020 03 09 14 47 41 -14.2474 -170.5644 60.30 42.00 18.30 471414 SMO 2020 01 18 01 13 00 1640-99 G co CCGG 70.640 -999.990 ... AR2 2020 03 09 15 16 19 -14.2474 -170.5644 47.00 42.00 5.00 471416 SMO 2020 01 18 01 13 00 5624-99 G co CCGG 70.470 -999.990 ... AR2 2020 03 09 15 30 43 -14.2474 -170.5644 47.00 42.00 5.00 471417 SMO 2020 01 24 00 53 00 4944-99 G co CCGG 70.180 -999.990 ... AR2 2020 03 05 14 27 58 -14.2474 -170.5644 47.00 42.00 5.00 471494 SMO 2020 01 24 00 53 00 5766-99 G co CCGG 70.460 -999.990 ... AR2 2020 03 05 14 42 16 -14.2474 -170.5644 47.00 42.00 5.00 471495 SMO 2020 01 24 03 22 00 1295-99 S co CCGG 118.720 -999.990 N.. AR2 2020 03 05 13 59 28 -14.2474 -170.5644 60.30 42.00 18.30 471496 SMO 2020 01 24 03 22 00 3886-99 S co CCGG 72.140 -999.990 ... AR2 2020 03 05 14 13 39 -14.2474 -170.5644 60.30 42.00 18.30 471497 SMO 2020 01 31 21 27 00 4133-99 S co CCGG 68.670 -999.990 ... AR2 2020 03 10 16 09 09 -14.2474 -170.5644 60.30 42.00 18.30 471383 SMO 2020 01 31 21 27 00 5886-99 S co CCGG 68.310 -999.990 ... AR2 2020 03 10 16 23 30 -14.2474 -170.5644 60.30 42.00 18.30 471382 SMO 2020 02 01 02 05 00 3348-99 G co CCGG 68.150 -999.990 ... AR2 2020 03 10 15 54 52 -14.2474 -170.5644 47.00 42.00 5.00 471380 SMO 2020 02 01 02 05 00 4832-99 G co CCGG 67.620 -999.990 ... AR2 2020 03 10 15 40 32 -14.2474 -170.5644 47.00 42.00 5.00 471381 SMO 2020 02 07 22 09 00 4164-99 G co CCGG 60.880 -999.990 ... AR2 2020 03 23 15 26 34 -14.2474 -170.5644 47.00 42.00 5.00 471775 SMO 2020 02 07 22 09 00 5182-99 G co CCGG 61.010 -999.990 ... AR2 2020 03 23 15 12 13 -14.2474 -170.5644 47.00 42.00 5.00 471776 SMO 2020 02 15 00 38 00 2934-99 G co CCGG 64.120 -999.990 ... AR2 2020 03 23 15 40 55 -14.2474 -170.5644 47.00 42.00 5.00 471773 SMO 2020 02 15 00 38 00 5310-99 G co CCGG 64.330 -999.990 ... AR2 2020 03 23 15 55 18 -14.2474 -170.5644 47.00 42.00 5.00 471774 SMO 2020 02 29 23 50 00 4079-99 G co CCGG 63.510 -999.990 ... AR2 2020 04 09 14 31 09 -14.2474 -170.5644 47.00 42.00 5.00 472734 SMO 2020 02 29 23 50 00 5168-99 G co CCGG 63.750 -999.990 ... AR2 2020 04 09 14 45 29 -14.2474 -170.5644 47.00 42.00 5.00 472735 SMO 2020 03 06 00 27 00 235-99 S co CCGG 78.890 -999.990 .X. AR2 2020 04 09 15 28 31 -14.2474 -170.5644 60.30 42.00 18.30 472738 SMO 2020 03 06 00 27 00 5276-99 S co CCGG 79.060 -999.990 .X. AR2 2020 04 09 15 42 52 -14.2474 -170.5644 60.30 42.00 18.30 472739 SMO 2020 03 06 01 50 00 2534-99 G co CCGG 76.040 -999.990 .X. AR2 2020 04 09 14 16 50 -14.2474 -170.5644 47.00 42.00 5.00 472733 SMO 2020 03 06 01 50 00 4307-99 G co CCGG 76.860 -999.990 .X. AR2 2020 04 09 14 02 31 -14.2474 -170.5644 47.00 42.00 5.00 472732 SMO 2020 03 11 00 21 00 291-99 S co CCGG 63.790 -999.990 ... AR2 2020 04 09 14 59 48 -14.2474 -170.5644 60.30 42.00 18.30 472736 SMO 2020 03 11 00 21 00 826-99 S co CCGG 63.210 -999.990 ... AR2 2020 04 09 15 14 10 -14.2474 -170.5644 60.30 42.00 18.30 472737 SMO 2020 03 11 01 34 00 2698-99 G co CCGG 63.970 -999.990 ... AR2 2020 04 14 10 35 39 -14.2474 -170.5644 47.00 42.00 5.00 473011 SMO 2020 03 11 01 34 00 765-99 G co CCGG 63.540 -999.990 ... AR2 2020 04 14 10 49 59 -14.2474 -170.5644 47.00 42.00 5.00 473012 SMO 2020 03 20 21 12 00 619-99 S co CCGG 56.890 -999.990 ... AR2 2020 04 14 10 06 57 -14.2474 -170.5644 60.30 42.00 18.30 473013 SMO 2020 03 20 21 12 00 8-99 S co CCGG 57.220 -999.990 ... AR2 2020 04 14 10 21 18 -14.2474 -170.5644 60.30 42.00 18.30 473014 SMO 2020 03 20 22 31 00 3024-99 G co CCGG 57.600 -999.990 ... AR2 2020 04 28 13 47 57 -14.2474 -170.5644 47.00 42.00 5.00 473577 SMO 2020 03 20 22 31 00 502-99 G co CCGG 57.480 -999.990 ... AR2 2020 04 28 13 33 35 -14.2474 -170.5644 47.00 42.00 5.00 473578 SMO 2020 03 28 00 05 00 4695-99 G co CCGG 57.290 -999.990 ... AR2 2020 04 20 10 20 32 -14.2474 -170.5644 47.00 42.00 5.00 473296 SMO 2020 03 28 00 05 00 4962-99 G co CCGG 57.070 -999.990 ... AR2 2020 04 20 10 34 51 -14.2474 -170.5644 47.00 42.00 5.00 473297 SMO 2020 04 03 02 20 00 1956-99 G co CCGG 56.870 -999.990 ... AR2 2020 05 05 10 32 04 -14.2474 -170.5644 47.00 42.00 5.00 473898 SMO 2020 04 03 02 20 00 2112-99 G co CCGG 57.070 -999.990 ... AR2 2020 05 05 10 46 25 -14.2474 -170.5644 47.00 42.00 5.00 473899 SMO 2020 04 12 01 15 00 5012-99 G co CCGG 66.710 -999.990 ... AR2 2020 05 05 12 12 33 -14.2474 -170.5644 60.30 42.00 18.30 473931 SMO 2020 04 12 01 15 00 5348-99 G co CCGG 66.630 -999.990 ... AR2 2020 05 05 11 58 14 -14.2474 -170.5644 60.30 42.00 18.30 473930 SMO 2020 04 15 22 31 00 3044-99 S co CCGG 58.280 -999.990 ... AR2 2020 05 19 11 05 23 -14.2474 -170.5644 60.30 42.00 18.30 474464 SMO 2020 04 15 22 31 00 4980-99 S co CCGG 58.200 -999.990 ... AR2 2020 05 19 11 19 43 -14.2474 -170.5644 60.30 42.00 18.30 474465 SMO 2020 04 16 03 26 00 2921-99 G co CCGG 57.360 -999.990 ... AR2 2020 05 19 10 36 42 -14.2474 -170.5644 47.00 42.00 5.00 474462 SMO 2020 04 16 03 26 00 4298-99 G co CCGG 56.950 -999.990 ... AR2 2020 05 19 10 51 06 -14.2474 -170.5644 47.00 42.00 5.00 474463 SMO 2020 04 24 00 59 00 4480-99 G co CCGG 64.320 -999.990 ... AR2 2020 05 19 13 29 03 -14.2474 -170.5644 47.00 42.00 5.00 474444 SMO 2020 04 24 00 59 00 5578-99 G co CCGG 64.380 -999.990 ... AR2 2020 05 19 13 43 20 -14.2474 -170.5644 47.00 42.00 5.00 474445 SMO 2020 04 29 00 54 00 490-99 G co CCGG 58.100 -999.990 ... AR2 2020 05 19 13 57 38 -14.2474 -170.5644 47.00 42.00 5.00 474446 SMO 2020 04 29 00 54 00 781-99 G co CCGG 58.230 -999.990 ... AR2 2020 05 19 14 11 55 -14.2474 -170.5644 47.00 42.00 5.00 474447 SMO 2020 05 06 00 33 00 2211-99 G co CCGG 60.280 -999.990 ... AR2 2020 06 05 10 33 38 -14.2474 -170.5644 47.00 42.00 5.00 474991 SMO 2020 05 06 00 33 00 990-99 G co CCGG 63.190 -999.990 ... AR2 2020 06 05 10 19 17 -14.2474 -170.5644 47.00 42.00 5.00 474990 SMO 2020 05 06 01 25 00 211-99 S co CCGG 61.370 -999.990 ... AR2 2020 06 05 10 47 59 -14.2474 -170.5644 60.30 42.00 18.30 474992 SMO 2020 05 06 01 25 00 4713-99 S co CCGG 59.560 -999.990 ... AR2 2020 06 05 11 02 20 -14.2474 -170.5644 60.30 42.00 18.30 474993 SMO 2020 05 12 20 25 00 4700-99 S co CCGG 61.350 -999.990 ... AR2 2020 06 16 11 44 54 -14.2474 -170.5644 60.30 42.00 18.30 475850 SMO 2020 05 12 20 25 00 98-99 S co CCGG 61.720 -999.990 ... AR2 2020 06 16 11 30 33 -14.2474 -170.5644 60.30 42.00 18.30 475849 SMO 2020 05 12 22 37 00 1726-99 G co CCGG 61.430 -999.990 ... AR2 2020 06 15 16 32 18 -14.2474 -170.5644 47.00 42.00 5.00 475914 SMO 2020 05 12 22 37 00 4844-99 G co CCGG 61.350 -999.990 ... AR2 2020 06 15 16 17 58 -14.2474 -170.5644 47.00 42.00 5.00 475915 SMO 2020 05 21 23 06 00 1906-99 G co CCGG 60.300 -999.990 ... AR2 2020 07 14 15 42 19 -14.2474 -170.5644 47.00 42.00 5.00 476858 SMO 2020 05 21 23 06 00 2709-99 G co CCGG 60.540 -999.990 ... AR2 2020 07 14 15 56 39 -14.2474 -170.5644 47.00 42.00 5.00 476859 SMO 2020 05 22 01 19 00 3176-99 S co CCGG 61.200 -999.990 ... AR2 2020 07 14 13 33 01 -14.2474 -170.5644 60.30 42.00 18.30 476677 SMO 2020 05 22 01 19 00 667-99 S co CCGG 61.070 -999.990 ... AR2 2020 07 14 13 18 40 -14.2474 -170.5644 60.30 42.00 18.30 476676 SMO 2020 05 29 22 41 00 3434-99 S co CCGG 63.190 -999.990 ... AR2 2020 07 13 12 57 35 -14.2474 -170.5644 60.30 42.00 18.30 476865 SMO 2020 05 29 22 41 00 4245-99 S co CCGG 63.250 -999.990 ... AR2 2020 07 13 12 43 13 -14.2474 -170.5644 60.30 42.00 18.30 476864 SMO 2020 05 30 01 00 00 3699-99 G co CCGG 62.940 -999.990 ... AR2 2020 07 10 10 47 32 -14.2474 -170.5644 47.00 42.00 5.00 476866 SMO 2020 05 30 01 00 00 5835-99 G co CCGG 62.740 -999.990 ... AR2 2020 07 10 11 01 54 -14.2474 -170.5644 47.00 42.00 5.00 476867 SMO 2020 06 04 22 26 00 3918-99 S co CCGG 60.880 -999.990 ... AR2 2020 07 21 13 18 37 -14.2474 -170.5644 60.30 42.00 18.30 477167 SMO 2020 06 04 22 26 00 4978-99 S co CCGG 59.590 -999.990 ... AR2 2020 07 21 13 33 03 -14.2474 -170.5644 60.30 42.00 18.30 477168 SMO 2020 06 05 00 57 00 2234-99 G co CCGG 60.060 -999.990 ... AR2 2020 07 21 12 49 48 -14.2474 -170.5644 47.00 42.00 5.00 477165 SMO 2020 06 05 00 57 00 2503-99 G co CCGG 59.880 -999.990 ... AR2 2020 07 21 13 04 12 -14.2474 -170.5644 47.00 42.00 5.00 477166 SMO 2020 06 12 21 20 00 2931-99 S co CCGG 59.960 -999.990 ... AR2 2020 07 21 12 20 55 -14.2474 -170.5644 60.30 42.00 18.30 477164 SMO 2020 06 13 00 54 00 1747-99 G co CCGG 59.270 -999.990 ... AR2 2020 07 21 11 52 04 -14.2474 -170.5644 47.00 42.00 5.00 477205 SMO 2020 06 13 00 54 00 5693-99 G co CCGG 59.130 -999.990 ... AR2 2020 07 21 12 06 29 -14.2474 -170.5644 47.00 42.00 5.00 477206 SMO 2020 06 19 22 27 00 5084-99 S co CCGG 59.840 -999.990 ... AR2 2020 07 28 09 48 14 -14.2474 -170.5644 60.30 42.00 18.30 477520 SMO 2020 06 19 22 27 00 5262-99 S co CCGG 59.970 -999.990 ... AR2 2020 07 28 10 02 37 -14.2474 -170.5644 60.30 42.00 18.30 477521 SMO 2020 06 20 00 39 00 2104-99 G co CCGG 60.130 -999.990 ... AR2 2020 07 27 14 46 26 -14.2474 -170.5644 47.00 42.00 5.00 477522 SMO 2020 06 20 00 39 00 3045-99 G co CCGG 59.270 -999.990 ... AR2 2020 07 27 15 00 51 -14.2474 -170.5644 47.00 42.00 5.00 477523 SMO 2020 06 26 21 25 00 4670-99 S co CCGG 58.930 -999.990 ... AR2 2020 07 23 16 02 53 -14.2474 -170.5644 60.30 42.00 18.30 477438 SMO 2020 06 26 21 25 00 849-99 S co CCGG 59.380 -999.990 ... AR2 2020 07 23 16 17 18 -14.2474 -170.5644 60.30 42.00 18.30 477437 SMO 2020 06 27 00 21 00 2056-99 G co CCGG 59.100 -999.990 ... AR2 2020 07 23 16 31 40 -14.2474 -170.5644 47.00 42.00 5.00 477439 SMO 2020 06 27 00 21 00 4715-99 G co CCGG 59.050 -999.990 ... AR2 2020 07 23 16 46 02 -14.2474 -170.5644 47.00 42.00 5.00 477440 SMO 2020 07 02 23 33 00 1135-99 S co CCGG 62.240 -999.990 ... AR2 2020 08 04 14 58 41 -14.2474 -170.5644 60.30 42.00 18.30 478020 SMO 2020 07 02 23 33 00 1392-99 S co CCGG 61.850 -999.990 ... AR2 2020 08 04 15 13 03 -14.2474 -170.5644 60.30 42.00 18.30 478021 SMO 2020 07 03 01 10 00 1629-99 G co CCGG 61.680 -999.990 ... AR2 2020 08 05 10 46 17 -14.2474 -170.5644 47.00 42.00 5.00 478022 SMO 2020 07 03 01 10 00 2767-99 G co CCGG 61.670 -999.990 ... AR2 2020 08 05 11 00 41 -14.2474 -170.5644 47.00 42.00 5.00 478023 SMO 2020 07 09 20 43 00 452-99 S co CCGG 60.330 -999.990 ... AR2 2020 08 04 14 15 29 -14.2474 -170.5644 60.30 42.00 18.30 478019 SMO 2020 07 09 20 43 00 5684-99 S co CCGG 59.900 -999.990 ... AR2 2020 08 04 14 01 04 -14.2474 -170.5644 60.30 42.00 18.30 478018 SMO 2020 07 09 21 25 00 486-99 G co CCGG 60.880 -999.990 ... AR2 2020 08 04 13 32 14 -14.2474 -170.5644 47.00 42.00 5.00 478016 SMO 2020 07 09 21 25 00 5520-99 G co CCGG 60.820 -999.990 ... AR2 2020 08 04 13 46 41 -14.2474 -170.5644 47.00 42.00 5.00 478017 SMO 2020 07 18 03 07 00 2283-99 G co CCGG 59.780 -999.990 ... AR2 2020 08 13 15 39 29 -14.2474 -170.5644 47.00 42.00 5.00 478382 SMO 2020 07 18 03 07 00 2355-99 G co CCGG 59.860 -999.990 ... AR2 2020 08 13 15 53 49 -14.2474 -170.5644 47.00 42.00 5.00 478381 SMO 2020 07 18 06 24 00 1947-99 S co CCGG 60.550 -999.990 ... AR2 2020 08 13 15 10 49 -14.2474 -170.5644 60.30 42.00 18.30 478383 SMO 2020 07 18 06 24 00 2307-99 S co CCGG 60.970 -999.990 ... AR2 2020 08 13 15 25 09 -14.2474 -170.5644 60.30 42.00 18.30 478384 SMO 2020 07 23 18 11 00 2430-99 S co CCGG 60.920 -999.990 ... AR2 2020 08 21 10 41 31 -14.2474 -170.5644 60.30 42.00 18.30 478947 SMO 2020 07 23 18 11 00 3239-99 S co CCGG 60.270 -999.990 ... AR2 2020 08 21 10 55 52 -14.2474 -170.5644 60.30 42.00 18.30 478948 SMO 2020 07 23 19 06 00 4846-99 G co CCGG 60.080 -999.990 ... AR2 2020 08 21 10 12 49 -14.2474 -170.5644 47.00 42.00 5.00 478949 SMO 2020 07 23 19 06 00 689-99 G co CCGG 60.290 -999.990 ... AR2 2020 08 21 10 27 10 -14.2474 -170.5644 47.00 42.00 5.00 478950 SMO 2020 07 31 20 20 00 2369-99 G co CCGG 61.270 -999.990 ... AR2 2020 09 17 11 59 59 -14.2474 -170.5644 47.00 42.00 5.00 479578 SMO 2020 07 31 22 09 00 1174-99 S co CCGG 62.600 -999.990 ... AR2 2020 09 22 10 55 59 -14.2474 -170.5644 60.30 42.00 18.30 479908 SMO 2020 07 31 22 09 00 2971-99 S co CCGG 61.130 -999.990 ... AR2 2020 09 22 11 10 30 -14.2474 -170.5644 60.30 42.00 18.30 479909 SMO 2020 08 07 20 36 00 4554-99 G co CCGG 60.300 -999.990 N.. AR2 2020 09 09 14 30 38 -14.2474 -170.5644 47.00 42.00 5.00 479604 SMO 2020 08 07 20 36 00 478-99 G co CCGG 64.920 -999.990 N.. AR2 2020 09 09 14 16 16 -14.2474 -170.5644 47.00 42.00 5.00 479603 SMO 2020 08 07 21 26 00 2624-99 S co CCGG 59.890 -999.990 ... AR2 2020 09 09 13 47 24 -14.2474 -170.5644 60.30 42.00 18.30 479601 SMO 2020 08 07 21 26 00 4707-99 S co CCGG 59.810 -999.990 ... AR2 2020 09 09 14 01 51 -14.2474 -170.5644 60.30 42.00 18.30 479602 SMO 2020 08 13 18 40 00 1586-99 S co CCGG 66.890 -999.990 ... AR2 2020 09 09 13 18 35 -14.2474 -170.5644 60.30 42.00 18.30 479605 SMO 2020 08 13 18 40 00 4494-99 S co CCGG 67.380 -999.990 ... AR2 2020 09 09 13 32 59 -14.2474 -170.5644 60.30 42.00 18.30 479606 SMO 2020 08 13 20 08 00 1664-99 G co CCGG 65.450 -999.990 ... AR2 2020 09 09 12 49 45 -14.2474 -170.5644 47.00 42.00 5.00 479607 SMO 2020 08 13 20 08 00 2601-99 G co CCGG 65.350 -999.990 ... AR2 2020 09 09 13 04 10 -14.2474 -170.5644 47.00 42.00 5.00 479608 SMO 2020 08 20 19 33 00 2869-99 S co CCGG 61.620 -999.990 ... AR2 2020 09 23 13 52 31 -14.2474 -170.5644 60.30 42.00 18.30 479893 SMO 2020 08 20 19 33 00 7-99 S co CCGG 60.570 -999.990 ... AR2 2020 09 23 13 38 06 -14.2474 -170.5644 60.30 42.00 18.30 479892 SMO 2020 08 20 21 10 00 1025-99 G co CCGG 61.140 -999.990 ... AR2 2020 09 23 13 09 02 -14.2474 -170.5644 47.00 42.00 5.00 479890 SMO 2020 08 20 21 10 00 3585-99 G co CCGG 60.790 -999.990 ... AR2 2020 09 23 13 23 34 -14.2474 -170.5644 47.00 42.00 5.00 479891 SMO 2020 08 28 21 18 00 1411-99 S co CCGG 67.010 -999.990 ... AR2 2020 09 25 10 57 13 -14.2474 -170.5644 60.30 42.00 18.30 480051 SMO 2020 08 28 21 18 00 4287-99 S co CCGG 68.870 -999.990 ... AR2 2020 09 25 11 11 30 -14.2474 -170.5644 60.30 42.00 18.30 480052 SMO 2020 08 28 22 46 00 2862-99 G co CCGG 66.690 -999.990 ... AR2 2020 09 25 10 00 10 -14.2474 -170.5644 47.00 42.00 5.00 480055 SMO 2020 08 28 22 46 00 2958-99 G co CCGG 66.430 -999.990 ... AR2 2020 09 25 10 14 27 -14.2474 -170.5644 47.00 42.00 5.00 480056 SMO 2020 09 01 19 27 00 3572-99 S co CCGG 63.200 -999.990 ... AR2 2020 09 25 13 20 36 -14.2474 -170.5644 60.30 42.00 18.30 480053 SMO 2020 09 01 19 27 00 5139-99 S co CCGG 61.990 -999.990 ... AR2 2020 09 25 13 34 48 -14.2474 -170.5644 60.30 42.00 18.30 480054 SMO 2020 09 01 20 10 00 4205-99 G co CCGG 62.020 -999.990 ... AR2 2020 09 25 13 49 05 -14.2474 -170.5644 47.00 42.00 5.00 480025 SMO 2020 09 01 20 10 00 4643-99 G co CCGG 62.020 -999.990 ... AR2 2020 09 25 14 03 25 -14.2474 -170.5644 47.00 42.00 5.00 480026 SMO 2020 09 08 18 39 00 1015-99 S co CCGG 60.790 -999.990 ... AR2 2020 09 29 12 41 26 -14.2474 -170.5644 60.30 42.00 18.30 480081 SMO 2020 09 08 18 39 00 3841-99 S co CCGG 61.200 -999.990 ... AR2 2020 09 29 12 55 45 -14.2474 -170.5644 60.30 42.00 18.30 480082 SMO 2020 09 08 19 31 00 4735-99 G co CCGG 60.670 -999.990 ... AR2 2020 09 29 12 12 49 -14.2474 -170.5644 47.00 42.00 5.00 480083 SMO 2020 09 08 19 31 00 5496-99 G co CCGG 60.720 -999.990 ... AR2 2020 09 29 12 27 08 -14.2474 -170.5644 47.00 42.00 5.00 480084 SMO 2020 09 18 20 04 00 160-99 G co CCGG 68.970 -999.990 ... AR2 2020 10 15 11 01 53 -14.2474 -170.5644 47.00 42.00 5.00 480640 SMO 2020 09 18 20 04 00 3085-99 G co CCGG 68.580 -999.990 ... AR2 2020 10 15 11 16 12 -14.2474 -170.5644 47.00 42.00 5.00 480641 SMO 2020 09 18 21 15 00 1582-99 S co CCGG 68.900 -999.990 ... AR2 2020 10 15 10 47 36 -14.2474 -170.5644 60.30 42.00 18.30 480642 SMO 2020 09 18 21 15 00 582-99 S co CCGG 68.830 -999.990 ... AR2 2020 10 15 10 33 20 -14.2474 -170.5644 60.30 42.00 18.30 480643 SMO 2020 09 25 19 37 00 1456-99 G co CCGG 64.360 -999.990 ... AR2 2020 10 22 18 23 02 -14.2474 -170.5644 47.00 42.00 5.00 481053 SMO 2020 09 25 19 37 00 3110-99 G co CCGG 64.450 -999.990 ... AR2 2020 10 22 18 37 20 -14.2474 -170.5644 47.00 42.00 5.00 481054 SMO 2020 09 25 21 02 00 4239-99 S co CCGG 64.450 -999.990 ... AR2 2020 10 22 17 54 30 -14.2474 -170.5644 60.30 42.00 18.30 481051 SMO 2020 09 25 21 02 00 5377-99 S co CCGG 64.090 -999.990 ... AR2 2020 10 22 18 08 46 -14.2474 -170.5644 60.30 42.00 18.30 481052 SMO 2020 09 29 18 19 00 1949-99 S co CCGG 66.970 -999.990 ... AR2 2020 10 22 12 25 27 -14.2474 -170.5644 60.30 42.00 18.30 481167 SMO 2020 09 29 18 19 00 612-99 S co CCGG 66.610 -999.990 ... AR2 2020 10 22 12 11 07 -14.2474 -170.5644 60.30 42.00 18.30 481168 SMO 2020 09 29 19 16 00 430-99 G co CCGG 66.770 -999.990 ... AR2 2020 10 22 11 42 28 -14.2474 -170.5644 47.00 42.00 5.00 481166 SMO 2020 09 29 19 16 00 638-99 G co CCGG 67.440 -999.990 ... AR2 2020 10 22 11 56 48 -14.2474 -170.5644 47.00 42.00 5.00 481165 SMO 2020 10 06 20 03 00 1777-99 G co CCGG 66.310 -999.990 ... AR2 2020 10 28 17 28 24 -14.2474 -170.5644 46.00 42.00 4.00 481200 SMO 2020 10 06 20 03 00 3778-99 G co CCGG 66.050 -999.990 ... AR2 2020 10 28 17 42 44 -14.2474 -170.5644 46.00 42.00 4.00 481201 SMO 2020 10 06 21 14 00 3670-99 S co CCGG 66.240 -999.990 ... AR2 2020 10 29 10 13 52 -14.2474 -170.5644 60.30 42.00 18.30 481202 SMO 2020 10 06 21 14 00 4649-99 S co CCGG 66.070 -999.990 ... AR2 2020 10 29 10 28 09 -14.2474 -170.5644 60.30 42.00 18.30 481203 SMO 2020 10 15 20 15 00 4479-99 S co CCGG 72.970 -999.990 ... AR2 2020 11 12 14 05 40 -14.2474 -170.5644 60.30 42.00 18.30 481922 SMO 2020 10 15 20 15 00 5198-99 S co CCGG 72.870 -999.990 ... AR2 2020 11 12 14 19 58 -14.2474 -170.5644 60.30 42.00 18.30 481923 SMO 2020 10 15 20 58 00 4050-99 G co CCGG 72.080 -999.990 ... AR2 2020 11 12 13 37 08 -14.2474 -170.5644 47.00 42.00 5.00 481920 SMO 2020 10 15 20 58 00 5168-99 G co CCGG 72.200 -999.990 ... AR2 2020 11 12 13 51 24 -14.2474 -170.5644 47.00 42.00 5.00 481921 SMO 2020 10 21 01 28 00 2491-99 G co CCGG 72.880 -999.990 ... AR2 2020 11 12 12 40 03 -14.2474 -170.5644 47.00 42.00 5.00 481916 SMO 2020 10 21 01 28 00 5872-99 G co CCGG 72.630 -999.990 ... AR2 2020 11 12 12 54 19 -14.2474 -170.5644 47.00 42.00 5.00 481917 SMO 2020 10 21 02 36 00 1415-99 S co CCGG 71.840 -999.990 ... AR2 2020 11 12 13 22 51 -14.2474 -170.5644 60.30 42.00 18.30 481919 SMO 2020 10 21 02 36 00 3005-99 S co CCGG 71.790 -999.990 ... AR2 2020 11 12 13 08 35 -14.2474 -170.5644 60.30 42.00 18.30 481918 SMO 2020 10 30 19 40 00 2801-99 S co CCGG 73.670 -999.990 ... AR2 2020 11 20 16 32 47 -14.2474 -170.5644 60.30 42.00 18.30 482316 SMO 2020 10 30 19 40 00 738-99 S co CCGG 74.280 -999.990 ... AR2 2020 11 20 16 18 27 -14.2474 -170.5644 60.30 42.00 18.30 482315 SMO 2020 10 30 20 42 00 2714-99 G co CCGG 73.760 -999.990 ... AR2 2020 11 20 16 47 02 -14.2474 -170.5644 47.00 42.00 5.00 482317 SMO 2020 10 30 20 42 00 5131-99 G co CCGG 73.650 -999.990 ... AR2 2020 11 20 17 01 18 -14.2474 -170.5644 47.00 42.00 5.00 482318 SMO 2020 11 06 01 36 00 2286-99 S co CCGG 74.560 -999.990 ... AR2 2020 12 01 15 11 18 -14.2474 -170.5644 60.30 42.00 18.30 482724 SMO 2020 11 06 01 36 00 3586-99 S co CCGG 74.810 -999.990 ... AR2 2020 12 01 15 25 31 -14.2474 -170.5644 60.30 42.00 18.30 482725 SMO 2020 11 06 02 40 00 1014-99 G co CCGG 72.640 -999.990 ... AR2 2020 12 01 15 39 47 -14.2474 -170.5644 60.30 42.00 18.30 482722 SMO 2020 11 06 02 40 00 2101-99 G co CCGG 72.550 -999.990 ... AR2 2020 12 01 15 54 03 -14.2474 -170.5644 60.30 42.00 18.30 482723 SMO 2020 11 15 18 37 00 1680-99 S co CCGG 66.190 -999.990 ... AR2 2020 12 07 13 27 42 -14.2474 -170.5644 60.30 42.00 18.30 482810 SMO 2020 11 15 18 37 00 2976-99 S co CCGG 65.590 -999.990 ... AR2 2020 12 07 13 42 03 -14.2474 -170.5644 60.30 42.00 18.30 482811 SMO 2020 11 15 20 29 00 3868-99 G co CCGG 66.190 -999.990 ... AR2 2020 12 07 13 13 23 -14.2474 -170.5644 47.00 42.00 5.00 482812 SMO 2020 11 15 20 29 00 5498-99 G co CCGG 66.230 -999.990 ... AR2 2020 12 07 12 59 04 -14.2474 -170.5644 47.00 42.00 5.00 482813 SMO 2020 11 27 18 37 00 1132-99 S co CCGG 67.330 -999.990 ... AR2 2021 01 09 14 57 13 -14.2474 -170.5644 60.30 42.00 18.30 484262 SMO 2020 11 27 18 37 00 2720-99 S co CCGG 67.370 -999.990 ... AR2 2021 01 09 15 11 32 -14.2474 -170.5644 60.30 42.00 18.30 484263 SMO 2020 11 27 19 29 00 1500-99 G co CCGG 66.560 -999.990 ... AR2 2021 01 09 15 40 03 -14.2474 -170.5644 47.00 42.00 5.00 484261 SMO 2020 11 27 19 29 00 33-99 G co CCGG 67.010 -999.990 ... AR2 2021 01 09 15 25 47 -14.2474 -170.5644 47.00 42.00 5.00 484260 SMO 2020 12 05 20 40 00 2997-99 S co CCGG 66.390 -999.990 ... AR2 2021 01 05 10 34 30 -14.2474 -170.5644 60.30 42.00 18.30 483900 SMO 2020 12 05 20 40 00 3593-99 S co CCGG 66.520 -999.990 ... AR2 2021 01 05 10 48 47 -14.2474 -170.5644 60.30 42.00 18.30 483901 SMO 2020 12 05 21 05 00 1288-99 G co CCGG 69.280 -999.990 ... AR2 2021 01 05 10 05 55 -14.2474 -170.5644 47.00 42.00 5.00 483899 SMO 2020 12 05 21 05 00 5146-99 G co CCGG 66.720 -999.990 ... AR2 2021 01 05 10 20 13 -14.2474 -170.5644 47.00 42.00 5.00 483898 SMO 2020 12 16 23 41 00 1085-99 S co CCGG 67.340 -999.990 ... AR2 2021 02 10 14 17 56 -14.2474 -170.5644 60.30 42.00 18.30 485205 SMO 2020 12 16 23 41 00 2923-99 S co CCGG 67.660 -999.990 ... AR2 2021 02 10 14 32 13 -14.2474 -170.5644 60.30 42.00 18.30 485206 SMO 2020 12 17 00 51 00 1437-99 G co CCGG 68.830 -999.990 ... AR2 2021 02 10 14 46 31 -14.2474 -170.5644 47.00 42.00 5.00 485203 SMO 2020 12 17 00 51 00 1765-99 G co CCGG 68.490 -999.990 ... AR2 2021 02 10 15 00 51 -14.2474 -170.5644 47.00 42.00 5.00 485204