# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-06-02 08:40:10 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO (In Situ) # Arlyn Andrews # tel: (303) 497-6773 # email: Arlyn.Andrews@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "Blackland Research and Extension Center-Texas Agricultural # Experiment Station" without whom these measurements would not # be possible. # # URL: http://www.pinnacletowers.com/ # # Sensors were installed on the KWKT-TV transmitter tower in February # 2001. In May 2006, this site became the first to use our newly # redesigned instrumentation suite. The upgrades were made in # time for the Texas Air Quality Study 2006 . We also carried # out a demonstration study during 2006 where an O3 sensor was # mounted at our highest sampling level (457 m above ground level). # The O3 data showed clear evidence of nighttime transport of # ozone in the nocturnal jet at the top of the planetary boundary # layer. This site periodically samples air that has passed over # the Dallas - Fort Worth and Houston metropolitan areas. At other # times, the site samples relatively clean air from the Gulf of # Mexico. Summertime weather patterns are dominated by a monsoonal # circulation over the Gulf. WKT thus provides a measurement of # the initial CO2 concentration for air passing over the continent # from the south. As air moves northward, the CO2 concentration # is modified by the action of sources (fossil fuel combustion, # plant respiration, biomass burning, cement production) and sinks # (photosynthesis). Partners: Blackland Research and Extension # Center-Texas Agricultural Experiment Station (Onyango Okello). # # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # code yr mo dy hr mn sc lat lon elev(masl) ht(magl) value totunc atmvar measunc scaleunc flag WKT 2010 05 01 00 09 55 31.3200 -97.3300 251.000 457.0 147.778 4.160 -999.990 -999.990 1.478 ..P WKT 2010 05 01 00 10 25 31.3200 -97.3300 251.000 457.0 151.579 4.340 -999.990 -999.990 1.516 ..P WKT 2010 05 01 00 10 55 31.3200 -97.3300 251.000 457.0 148.231 4.260 -999.990 -999.990 1.482 ..P WKT 2010 05 01 00 11 25 31.3200 -97.3300 251.000 457.0 151.482 4.620 -999.990 -999.990 1.515 ..P WKT 2010 05 01 00 11 55 31.3200 -97.3300 251.000 457.0 146.759 4.770 -999.990 -999.990 1.468 ..P WKT 2010 05 01 00 12 25 31.3200 -97.3300 251.000 457.0 154.684 5.750 -999.990 -999.990 1.547 ..P WKT 2010 05 01 00 12 55 31.3200 -97.3300 251.000 457.0 160.410 4.580 -999.990 -999.990 1.604 ..P WKT 2010 05 01 00 13 25 31.3200 -97.3300 251.000 457.0 155.137 4.500 -999.990 -999.990 1.551 ..P WKT 2010 05 01 00 13 55 31.3200 -97.3300 251.000 457.0 158.938 4.740 -999.990 -999.990 1.589 ..P WKT 2010 05 01 00 14 25 31.3200 -97.3300 251.000 457.0 156.141 4.690 -999.990 -999.990 1.561 ..P WKT 2010 05 01 00 14 55 31.3200 -97.3300 251.000 457.0 156.367 5.180 -999.990 -999.990 1.564 ..P WKT 2010 05 01 00 19 55 31.3200 -97.3300 251.000 30.0 150.660 6.570 -999.990 -999.990 1.507 ..P WKT 2010 05 01 00 24 55 31.3200 -97.3300 251.000 122.0 158.427 6.040 -999.990 -999.990 1.584 ..P WKT 2010 05 01 00 29 55 31.3200 -97.3300 251.000 457.0 152.717 5.660 -999.990 -999.990 1.527 ..P WKT 2010 05 01 00 34 55 31.3200 -97.3300 251.000 30.0 149.207 5.450 -999.990 -999.990 1.492 ..P WKT 2010 05 01 00 39 55 31.3200 -97.3300 251.000 122.0 151.475 5.240 -999.990 -999.990 1.515 ..P WKT 2010 05 01 00 44 55 31.3200 -97.3300 251.000 457.0 146.587 4.700 -999.990 -999.990 1.466 ..P WKT 2010 05 01 00 54 55 31.3200 -97.3300 251.000 30.0 148.201 4.620 -999.990 -999.990 1.482 ..P WKT 2010 05 01 00 59 55 31.3200 -97.3300 251.000 122.0 155.534 4.520 -999.990 -999.990 1.555 ..P WKT 2010 05 01 01 04 55 31.3200 -97.3300 251.000 457.0 152.540 5.040 -999.990 -999.990 1.525 ..P WKT 2010 05 01 01 09 55 31.3200 -97.3300 251.000 30.0 146.654 5.330 -999.990 -999.990 1.467 ..P WKT 2010 05 01 01 14 55 31.3200 -97.3300 251.000 122.0 160.740 4.860 -999.990 -999.990 1.607 ..P WKT 2010 05 01 01 19 55 31.3200 -97.3300 251.000 457.0 142.039 4.750 -999.990 -999.990 1.420 ..P WKT 2010 05 01 01 29 55 31.3200 -97.3300 251.000 30.0 149.904 4.520 -999.990 -999.990 1.499 ..P WKT 2010 05 01 01 34 55 31.3200 -97.3300 251.000 122.0 153.603 4.660 -999.990 -999.990 1.536 ..P WKT 2010 05 01 01 39 55 31.3200 -97.3300 251.000 457.0 147.238 4.890 -999.990 -999.990 1.472 ..P WKT 2010 05 01 01 44 55 31.3200 -97.3300 251.000 30.0 155.350 4.920 -999.990 -999.990 1.553 ..P WKT 2010 05 01 01 49 55 31.3200 -97.3300 251.000 122.0 158.913 5.320 -999.990 -999.990 1.589 ..P WKT 2010 05 01 01 54 55 31.3200 -97.3300 251.000 457.0 138.613 4.630 -999.990 -999.990 1.386 ..P WKT 2010 05 01 02 04 55 31.3200 -97.3300 251.000 30.0 156.994 4.100 -999.990 -999.990 1.570 ..P WKT 2010 05 01 02 09 55 31.3200 -97.3300 251.000 122.0 154.153 5.160 -999.990 -999.990 1.542 ..P WKT 2010 05 01 02 14 55 31.3200 -97.3300 251.000 457.0 151.724 4.450 -999.990 -999.990 1.517 ..P WKT 2010 05 01 02 19 55 31.3200 -97.3300 251.000 30.0 156.888 5.450 -999.990 -999.990 1.569 ..P WKT 2010 05 01 02 24 55 31.3200 -97.3300 251.000 122.0 155.011 4.940 -999.990 -999.990 1.550 ..P WKT 2010 05 01 02 29 55 31.3200 -97.3300 251.000 457.0 154.377 4.790 -999.990 -999.990 1.544 ..P WKT 2010 05 01 02 39 55 31.3200 -97.3300 251.000 30.0 166.035 4.640 -999.990 -999.990 1.660 ..P WKT 2010 05 01 02 44 55 31.3200 -97.3300 251.000 122.0 158.295 5.370 -999.990 -999.990 1.583 ..P WKT 2010 05 01 02 49 55 31.3200 -97.3300 251.000 457.0 163.407 4.940 -999.990 -999.990 1.634 ..P WKT 2010 05 01 02 54 55 31.3200 -97.3300 251.000 30.0 160.365 5.160 -999.990 -999.990 1.604 ..P WKT 2010 05 01 02 59 55 31.3200 -97.3300 251.000 122.0 168.519 4.710 -999.990 -999.990 1.685 ..P WKT 2010 05 01 03 04 55 31.3200 -97.3300 251.000 457.0 161.605 4.680 -999.990 -999.990 1.616 ..P WKT 2010 05 01 03 14 55 31.3200 -97.3300 251.000 30.0 158.063 4.210 -999.990 -999.990 1.581 ..P WKT 2010 05 01 03 19 55 31.3200 -97.3300 251.000 122.0 159.642 4.840 -999.990 -999.990 1.596 ..P WKT 2010 05 01 03 24 55 31.3200 -97.3300 251.000 457.0 171.460 5.250 -999.990 -999.990 1.715 ..P WKT 2010 05 01 03 29 55 31.3200 -97.3300 251.000 30.0 161.140 4.120 -999.990 -999.990 1.611 ..P WKT 2010 05 01 03 34 55 31.3200 -97.3300 251.000 122.0 156.629 4.000 -999.990 -999.990 1.566 ..P WKT 2010 05 01 03 39 55 31.3200 -97.3300 251.000 457.0 173.991 4.390 -999.990 -999.990 1.740 ..P WKT 2010 05 01 03 49 55 31.3200 -97.3300 251.000 30.0 165.603 3.870 -999.990 -999.990 1.656 ..P WKT 2010 05 01 03 54 55 31.3200 -97.3300 251.000 122.0 172.804 4.330 -999.990 -999.990 1.728 ..P WKT 2010 05 01 03 59 55 31.3200 -97.3300 251.000 457.0 184.718 4.060 -999.990 -999.990 1.847 ..P WKT 2010 05 01 04 04 55 31.3200 -97.3300 251.000 30.0 172.804 4.110 -999.990 -999.990 1.728 ..P WKT 2010 05 01 04 09 55 31.3200 -97.3300 251.000 122.0 172.804 4.570 -999.990 -999.990 1.728 ..P WKT 2010 05 01 04 14 55 31.3200 -97.3300 251.000 457.0 187.773 4.010 -999.990 -999.990 1.878 ..P WKT 2010 05 01 04 24 55 31.3200 -97.3300 251.000 30.0 172.883 4.500 -999.990 -999.990 1.729 ..P WKT 2010 05 01 04 29 55 31.3200 -97.3300 251.000 122.0 185.444 4.100 -999.990 -999.990 1.854 ..P WKT 2010 05 01 04 34 55 31.3200 -97.3300 251.000 457.0 187.467 4.350 -999.990 -999.990 1.875 ..P WKT 2010 05 01 04 39 55 31.3200 -97.3300 251.000 30.0 183.664 4.460 -999.990 -999.990 1.837 ..P WKT 2010 05 01 04 44 55 31.3200 -97.3300 251.000 122.0 179.583 4.160 -999.990 -999.990 1.796 ..P WKT 2010 05 01 04 49 55 31.3200 -97.3300 251.000 457.0 190.765 4.590 -999.990 -999.990 1.908 ..P WKT 2010 05 01 05 04 55 31.3200 -97.3300 251.000 30.0 177.535 4.600 -999.990 -999.990 1.775 ..P WKT 2010 05 01 05 09 55 31.3200 -97.3300 251.000 122.0 178.096 4.580 -999.990 -999.990 1.781 ..P WKT 2010 05 01 05 14 55 31.3200 -97.3300 251.000 457.0 205.601 4.950 -999.990 -999.990 2.056 ..P WKT 2010 05 01 05 19 55 31.3200 -97.3300 251.000 30.0 179.358 4.800 -999.990 -999.990 1.794 ..P WKT 2010 05 01 05 24 55 31.3200 -97.3300 251.000 122.0 170.472 4.340 -999.990 -999.990 1.705 ..P WKT 2010 05 01 05 29 55 31.3200 -97.3300 251.000 457.0 198.685 4.250 -999.990 -999.990 1.987 ..P WKT 2010 05 01 05 39 55 31.3200 -97.3300 251.000 30.0 184.957 4.400 -999.990 -999.990 1.850 ..P WKT 2010 05 01 05 44 55 31.3200 -97.3300 251.000 122.0 176.499 4.510 -999.990 -999.990 1.765 ..P WKT 2010 05 01 05 49 55 31.3200 -97.3300 251.000 457.0 202.382 4.190 -999.990 -999.990 2.024 ..P WKT 2010 05 01 05 54 55 31.3200 -97.3300 251.000 30.0 176.261 3.980 -999.990 -999.990 1.763 ..P WKT 2010 05 01 05 59 55 31.3200 -97.3300 251.000 122.0 184.349 3.850 -999.990 -999.990 1.843 ..P WKT 2010 05 01 06 04 55 31.3200 -97.3300 251.000 457.0 198.701 3.990 -999.990 -999.990 1.987 ..P WKT 2010 05 01 06 14 55 31.3200 -97.3300 251.000 30.0 183.898 4.120 -999.990 -999.990 1.839 ..P WKT 2010 05 01 06 19 55 31.3200 -97.3300 251.000 122.0 187.022 3.890 -999.990 -999.990 1.870 ..P WKT 2010 05 01 06 24 55 31.3200 -97.3300 251.000 457.0 195.298 4.450 -999.990 -999.990 1.953 ..P WKT 2010 05 01 06 29 55 31.3200 -97.3300 251.000 30.0 179.906 3.930 -999.990 -999.990 1.799 ..P WKT 2010 05 01 06 34 55 31.3200 -97.3300 251.000 122.0 181.777 3.950 -999.990 -999.990 1.818 ..P WKT 2010 05 01 06 39 55 31.3200 -97.3300 251.000 457.0 202.732 4.010 -999.990 -999.990 2.027 ..P WKT 2010 05 01 06 49 55 31.3200 -97.3300 251.000 30.0 186.439 4.120 -999.990 -999.990 1.864 ..P WKT 2010 05 01 06 54 55 31.3200 -97.3300 251.000 122.0 184.849 3.950 -999.990 -999.990 1.848 ..P WKT 2010 05 01 06 59 55 31.3200 -97.3300 251.000 457.0 197.615 4.040 -999.990 -999.990 1.976 ..P WKT 2010 05 01 07 04 55 31.3200 -97.3300 251.000 30.0 182.363 3.800 -999.990 -999.990 1.824 ..P WKT 2010 05 01 07 09 55 31.3200 -97.3300 251.000 122.0 194.157 4.830 -999.990 -999.990 1.942 ..P WKT 2010 05 01 07 14 55 31.3200 -97.3300 251.000 457.0 202.329 4.260 -999.990 -999.990 2.023 ..P WKT 2010 05 01 07 24 55 31.3200 -97.3300 251.000 30.0 185.519 4.140 -999.990 -999.990 1.855 ..P WKT 2010 05 01 07 29 55 31.3200 -97.3300 251.000 122.0 194.570 4.180 -999.990 -999.990 1.946 ..P WKT 2010 05 01 07 34 55 31.3200 -97.3300 251.000 457.0 193.856 4.020 -999.990 -999.990 1.939 ..P WKT 2010 05 01 07 39 55 31.3200 -97.3300 251.000 30.0 181.418 4.350 -999.990 -999.990 1.814 ..P WKT 2010 05 01 07 44 55 31.3200 -97.3300 251.000 122.0 190.753 3.930 -999.990 -999.990 1.908 ..P WKT 2010 05 01 07 49 55 31.3200 -97.3300 251.000 457.0 198.415 3.810 -999.990 -999.990 1.984 ..P WKT 2010 05 01 07 59 55 31.3200 -97.3300 251.000 30.0 180.067 3.610 -999.990 -999.990 1.801 ..P WKT 2010 05 01 08 04 55 31.3200 -97.3300 251.000 122.0 197.630 4.230 -999.990 -999.990 1.976 ..P WKT 2010 05 01 08 09 55 31.3200 -97.3300 251.000 457.0 198.991 4.200 -999.990 -999.990 1.990 ..P WKT 2010 05 01 08 14 55 31.3200 -97.3300 251.000 30.0 183.585 3.970 -999.990 -999.990 1.836 ..P WKT 2010 05 01 08 19 55 31.3200 -97.3300 251.000 122.0 196.125 3.980 -999.990 -999.990 1.961 ..P WKT 2010 05 01 08 24 55 31.3200 -97.3300 251.000 457.0 197.487 3.880 -999.990 -999.990 1.975 ..P WKT 2010 05 01 08 34 55 31.3200 -97.3300 251.000 30.0 186.688 3.760 -999.990 -999.990 1.867 ..P WKT 2010 05 01 08 39 55 31.3200 -97.3300 251.000 122.0 195.781 4.510 -999.990 -999.990 1.958 ..P WKT 2010 05 01 08 44 55 31.3200 -97.3300 251.000 457.0 193.967 4.010 -999.990 -999.990 1.940 ..P WKT 2010 05 01 08 49 55 31.3200 -97.3300 251.000 30.0 190.753 4.230 -999.990 -999.990 1.908 ..P WKT 2010 05 01 08 54 55 31.3200 -97.3300 251.000 122.0 209.367 4.180 -999.990 -999.990 2.094 ..P WKT 2010 05 01 08 59 55 31.3200 -97.3300 251.000 457.0 197.476 4.500 -999.990 -999.990 1.975 ..P WKT 2010 05 01 09 09 55 31.3200 -97.3300 251.000 30.0 191.745 4.920 -999.990 -999.990 1.917 ..P WKT 2010 05 01 09 14 55 31.3200 -97.3300 251.000 122.0 189.788 4.680 -999.990 -999.990 1.898 ..P WKT 2010 05 01 09 19 55 31.3200 -97.3300 251.000 457.0 192.311 4.350 -999.990 -999.990 1.923 ..P WKT 2010 05 01 09 24 55 31.3200 -97.3300 251.000 30.0 174.385 5.450 -999.990 -999.990 1.744 ..P WKT 2010 05 01 09 29 55 31.3200 -97.3300 251.000 122.0 160.796 4.460 -999.990 -999.990 1.608 ..P WKT 2010 05 01 09 34 55 31.3200 -97.3300 251.000 457.0 173.265 3.790 -999.990 -999.990 1.733 ..P WKT 2010 05 01 09 44 55 31.3200 -97.3300 251.000 30.0 155.243 3.880 -999.990 -999.990 1.552 ..P WKT 2010 05 01 09 49 55 31.3200 -97.3300 251.000 122.0 154.038 4.290 -999.990 -999.990 1.540 ..P WKT 2010 05 01 09 54 55 31.3200 -97.3300 251.000 457.0 166.294 4.890 -999.990 -999.990 1.663 ..P WKT 2010 05 01 09 59 55 31.3200 -97.3300 251.000 30.0 154.292 3.900 -999.990 -999.990 1.543 ..P WKT 2010 05 01 10 04 55 31.3200 -97.3300 251.000 122.0 158.558 4.650 -999.990 -999.990 1.586 ..P WKT 2010 05 01 10 09 55 31.3200 -97.3300 251.000 457.0 171.522 4.810 -999.990 -999.990 1.715 ..P WKT 2010 05 01 10 19 55 31.3200 -97.3300 251.000 30.0 159.753 3.570 -999.990 -999.990 1.598 ..P WKT 2010 05 01 10 24 55 31.3200 -97.3300 251.000 122.0 161.395 5.230 -999.990 -999.990 1.614 ..P WKT 2010 05 01 10 29 55 31.3200 -97.3300 251.000 457.0 166.828 4.640 -999.990 -999.990 1.668 ..P WKT 2010 05 01 10 34 55 31.3200 -97.3300 251.000 30.0 160.749 4.220 -999.990 -999.990 1.607 ..P WKT 2010 05 01 10 39 55 31.3200 -97.3300 251.000 122.0 163.094 4.040 -999.990 -999.990 1.631 ..P WKT 2010 05 01 10 44 55 31.3200 -97.3300 251.000 457.0 171.339 3.140 -999.990 -999.990 1.713 ..P WKT 2010 05 01 10 54 55 31.3200 -97.3300 251.000 30.0 166.542 3.350 -999.990 -999.990 1.665 ..P WKT 2010 05 01 10 59 55 31.3200 -97.3300 251.000 122.0 169.933 4.620 -999.990 -999.990 1.699 ..P WKT 2010 05 01 11 04 55 31.3200 -97.3300 251.000 457.0 165.736 3.670 -999.990 -999.990 1.657 ..P WKT 2010 05 01 11 09 55 31.3200 -97.3300 251.000 30.0 165.193 4.030 -999.990 -999.990 1.652 ..P WKT 2010 05 01 11 14 55 31.3200 -97.3300 251.000 122.0 164.930 4.750 -999.990 -999.990 1.649 ..P WKT 2010 05 01 11 19 55 31.3200 -97.3300 251.000 457.0 161.574 5.110 -999.990 -999.990 1.616 ..P WKT 2010 05 01 11 29 55 31.3200 -97.3300 251.000 30.0 162.475 4.860 -999.990 -999.990 1.625 ..P WKT 2010 05 01 11 34 55 31.3200 -97.3300 251.000 122.0 156.604 5.020 -999.990 -999.990 1.566 ..P WKT 2010 05 01 11 39 55 31.3200 -97.3300 251.000 457.0 157.486 4.660 -999.990 -999.990 1.575 ..P WKT 2010 05 01 11 44 55 31.3200 -97.3300 251.000 30.0 155.271 5.010 -999.990 -999.990 1.553 ..P WKT 2010 05 01 11 49 55 31.3200 -97.3300 251.000 122.0 149.959 4.730 -999.990 -999.990 1.500 ..P WKT 2010 05 01 12 09 55 31.3200 -97.3300 251.000 457.0 147.930 3.480 -999.990 -999.990 1.479 ..P WKT 2010 05 01 12 10 25 31.3200 -97.3300 251.000 457.0 142.658 3.680 -999.990 -999.990 1.427 ..P WKT 2010 05 01 12 10 55 31.3200 -97.3300 251.000 457.0 144.424 3.460 -999.990 -999.990 1.444 ..P WKT 2010 05 01 12 11 25 31.3200 -97.3300 251.000 457.0 143.937 3.440 -999.990 -999.990 1.439 ..P WKT 2010 05 01 12 11 55 31.3200 -97.3300 251.000 457.0 143.733 3.540 -999.990 -999.990 1.437 ..P WKT 2010 05 01 12 12 25 31.3200 -97.3300 251.000 457.0 138.742 4.090 -999.990 -999.990 1.387 ..P WKT 2010 05 01 12 12 55 31.3200 -97.3300 251.000 457.0 142.197 5.240 -999.990 -999.990 1.422 ..P WKT 2010 05 01 12 13 25 31.3200 -97.3300 251.000 457.0 146.778 4.460 -999.990 -999.990 1.468 ..P WKT 2010 05 01 12 13 55 31.3200 -97.3300 251.000 457.0 138.973 3.770 -999.990 -999.990 1.390 ..P WKT 2010 05 01 12 14 25 31.3200 -97.3300 251.000 457.0 141.301 3.910 -999.990 -999.990 1.413 ..P WKT 2010 05 01 12 14 55 31.3200 -97.3300 251.000 457.0 142.786 3.970 -999.990 -999.990 1.428 ..P WKT 2010 05 01 12 19 55 31.3200 -97.3300 251.000 30.0 145.242 4.750 -999.990 -999.990 1.452 ..P WKT 2010 05 01 12 24 55 31.3200 -97.3300 251.000 122.0 144.040 5.080 -999.990 -999.990 1.440 ..P WKT 2010 05 01 12 29 55 31.3200 -97.3300 251.000 457.0 145.932 4.280 -999.990 -999.990 1.459 ..P WKT 2010 05 01 12 34 55 31.3200 -97.3300 251.000 30.0 144.730 4.340 -999.990 -999.990 1.447 ..P WKT 2010 05 01 12 39 55 31.3200 -97.3300 251.000 122.0 147.465 3.530 -999.990 -999.990 1.475 ..P WKT 2010 05 01 12 44 55 31.3200 -97.3300 251.000 457.0 144.577 4.100 -999.990 -999.990 1.446 ..P WKT 2010 05 01 12 54 55 31.3200 -97.3300 251.000 30.0 142.161 3.550 -999.990 -999.990 1.422 ..P WKT 2010 05 01 12 59 55 31.3200 -97.3300 251.000 122.0 144.319 4.000 -999.990 -999.990 1.443 ..P WKT 2010 05 01 13 04 55 31.3200 -97.3300 251.000 457.0 137.206 4.650 -999.990 -999.990 1.372 ..P WKT 2010 05 01 13 09 55 31.3200 -97.3300 251.000 30.0 143.999 4.900 -999.990 -999.990 1.440 ..P WKT 2010 05 01 13 14 55 31.3200 -97.3300 251.000 122.0 145.173 4.710 -999.990 -999.990 1.452 ..P WKT 2010 05 01 13 19 55 31.3200 -97.3300 251.000 457.0 137.222 4.140 -999.990 -999.990 1.372 ..P WKT 2010 05 01 13 29 55 31.3200 -97.3300 251.000 30.0 143.098 3.670 -999.990 -999.990 1.431 ..P WKT 2010 05 01 13 34 55 31.3200 -97.3300 251.000 122.0 141.766 4.530 -999.990 -999.990 1.418 ..P WKT 2010 05 01 13 39 55 31.3200 -97.3300 251.000 457.0 136.788 5.140 -999.990 -999.990 1.368 ..P WKT 2010 05 01 13 44 55 31.3200 -97.3300 251.000 30.0 149.902 6.220 -999.990 -999.990 1.499 ..P WKT 2010 05 01 13 49 55 31.3200 -97.3300 251.000 122.0 148.849 5.070 -999.990 -999.990 1.488 ..P WKT 2010 05 01 13 54 55 31.3200 -97.3300 251.000 457.0 137.705 4.080 -999.990 -999.990 1.377 ..P WKT 2010 05 01 14 04 55 31.3200 -97.3300 251.000 30.0 152.360 4.100 -999.990 -999.990 1.524 ..P WKT 2010 05 01 14 09 55 31.3200 -97.3300 251.000 122.0 151.809 4.920 -999.990 -999.990 1.518 ..P WKT 2010 05 01 14 14 55 31.3200 -97.3300 251.000 457.0 142.993 5.850 -999.990 -999.990 1.430 ..P WKT 2010 05 01 14 19 55 31.3200 -97.3300 251.000 30.0 143.704 5.540 -999.990 -999.990 1.437 ..P WKT 2010 05 01 14 24 55 31.3200 -97.3300 251.000 122.0 147.074 4.740 -999.990 -999.990 1.471 ..P WKT 2010 05 01 14 29 55 31.3200 -97.3300 251.000 457.0 132.246 3.550 -999.990 -999.990 1.322 ..P WKT 2010 05 01 14 39 55 31.3200 -97.3300 251.000 30.0 143.386 4.650 -999.990 -999.990 1.434 ..P WKT 2010 05 01 14 44 55 31.3200 -97.3300 251.000 122.0 143.456 5.350 -999.990 -999.990 1.435 ..P WKT 2010 05 01 14 49 55 31.3200 -97.3300 251.000 457.0 136.533 6.910 -999.990 -999.990 1.365 ..P WKT 2010 05 01 14 54 55 31.3200 -97.3300 251.000 30.0 146.953 5.010 -999.990 -999.990 1.470 ..P WKT 2010 05 01 14 59 55 31.3200 -97.3300 251.000 122.0 145.065 4.420 -999.990 -999.990 1.451 ..P WKT 2010 05 01 15 04 55 31.3200 -97.3300 251.000 457.0 142.060 4.180 -999.990 -999.990 1.421 ..P WKT 2010 05 01 15 14 55 31.3200 -97.3300 251.000 30.0 152.441 4.740 -999.990 -999.990 1.524 ..P WKT 2010 05 01 15 19 55 31.3200 -97.3300 251.000 122.0 151.293 5.070 -999.990 -999.990 1.513 ..P WKT 2010 05 01 15 24 55 31.3200 -97.3300 251.000 457.0 140.367 5.220 -999.990 -999.990 1.404 ..P WKT 2010 05 01 15 29 55 31.3200 -97.3300 251.000 30.0 144.248 5.320 -999.990 -999.990 1.442 ..P WKT 2010 05 01 15 34 55 31.3200 -97.3300 251.000 122.0 142.543 5.630 -999.990 -999.990 1.425 ..P WKT 2010 05 01 15 39 55 31.3200 -97.3300 251.000 457.0 132.743 5.950 -999.990 -999.990 1.327 ..P WKT 2010 05 01 15 49 55 31.3200 -97.3300 251.000 30.0 142.375 5.490 -999.990 -999.990 1.424 ..P WKT 2010 05 01 15 54 55 31.3200 -97.3300 251.000 122.0 142.824 5.560 -999.990 -999.990 1.428 ..P WKT 2010 05 01 15 59 55 31.3200 -97.3300 251.000 457.0 133.231 5.160 -999.990 -999.990 1.332 ..P WKT 2010 05 01 16 04 55 31.3200 -97.3300 251.000 30.0 143.164 4.510 -999.990 -999.990 1.432 ..P WKT 2010 05 01 16 09 55 31.3200 -97.3300 251.000 122.0 145.844 5.310 -999.990 -999.990 1.458 ..P WKT 2010 05 01 16 14 55 31.3200 -97.3300 251.000 457.0 140.158 3.570 -999.990 -999.990 1.402 ..P WKT 2010 05 01 16 24 55 31.3200 -97.3300 251.000 30.0 148.979 3.360 -999.990 -999.990 1.490 ..P WKT 2010 05 01 16 29 55 31.3200 -97.3300 251.000 122.0 148.152 3.660 -999.990 -999.990 1.482 ..P WKT 2010 05 01 16 34 55 31.3200 -97.3300 251.000 457.0 142.590 3.860 -999.990 -999.990 1.426 ..P WKT 2010 05 01 16 39 55 31.3200 -97.3300 251.000 30.0 149.007 4.210 -999.990 -999.990 1.490 ..P WKT 2010 05 01 16 44 55 31.3200 -97.3300 251.000 122.0 146.649 5.690 -999.990 -999.990 1.466 ..P WKT 2010 05 01 16 49 55 31.3200 -97.3300 251.000 457.0 146.520 3.850 -999.990 -999.990 1.465 ..P WKT 2010 05 01 17 04 55 31.3200 -97.3300 251.000 30.0 155.720 4.550 -999.990 -999.990 1.557 ..P WKT 2010 05 01 17 09 55 31.3200 -97.3300 251.000 122.0 148.699 4.070 -999.990 -999.990 1.487 ..P WKT 2010 05 01 17 14 55 31.3200 -97.3300 251.000 457.0 150.581 4.670 -999.990 -999.990 1.506 ..P WKT 2010 05 01 17 19 55 31.3200 -97.3300 251.000 30.0 153.157 4.070 -999.990 -999.990 1.532 ..P WKT 2010 05 01 17 24 55 31.3200 -97.3300 251.000 122.0 153.508 4.350 -999.990 -999.990 1.535 ..P WKT 2010 05 01 17 29 55 31.3200 -97.3300 251.000 457.0 152.886 4.600 -999.990 -999.990 1.529 ..P WKT 2010 05 01 17 39 55 31.3200 -97.3300 251.000 30.0 152.828 4.690 -999.990 -999.990 1.528 ..P WKT 2010 05 01 17 44 55 31.3200 -97.3300 251.000 122.0 153.393 4.390 -999.990 -999.990 1.534 ..P WKT 2010 05 01 17 49 55 31.3200 -97.3300 251.000 457.0 152.707 4.360 -999.990 -999.990 1.527 ..P WKT 2010 05 01 17 54 55 31.3200 -97.3300 251.000 30.0 151.466 4.520 -999.990 -999.990 1.515 ..P WKT 2010 05 01 17 59 55 31.3200 -97.3300 251.000 122.0 154.112 4.540 -999.990 -999.990 1.541 ..P WKT 2010 05 01 18 04 55 31.3200 -97.3300 251.000 457.0 151.206 4.250 -999.990 -999.990 1.512 ..P WKT 2010 05 01 18 14 55 31.3200 -97.3300 251.000 30.0 154.137 4.380 -999.990 -999.990 1.541 ..P WKT 2010 05 01 18 19 55 31.3200 -97.3300 251.000 122.0 155.255 3.890 -999.990 -999.990 1.553 ..P WKT 2010 05 01 18 24 55 31.3200 -97.3300 251.000 457.0 153.183 4.960 -999.990 -999.990 1.532 ..P WKT 2010 05 01 18 29 55 31.3200 -97.3300 251.000 30.0 152.775 3.810 -999.990 -999.990 1.528 ..P WKT 2010 05 01 18 34 55 31.3200 -97.3300 251.000 122.0 159.992 3.450 -999.990 -999.990 1.600 ..P WKT 2010 05 01 18 39 55 31.3200 -97.3300 251.000 457.0 156.951 3.470 -999.990 -999.990 1.570 ..P WKT 2010 05 01 18 49 55 31.3200 -97.3300 251.000 30.0 161.557 3.290 -999.990 -999.990 1.616 ..P WKT 2010 05 01 18 54 55 31.3200 -97.3300 251.000 122.0 154.520 3.310 -999.990 -999.990 1.545 ..P WKT 2010 05 01 18 59 55 31.3200 -97.3300 251.000 457.0 163.272 3.980 -999.990 -999.990 1.633 ..P WKT 2010 05 01 19 04 55 31.3200 -97.3300 251.000 30.0 158.453 3.620 -999.990 -999.990 1.585 ..P WKT 2010 05 01 19 09 55 31.3200 -97.3300 251.000 122.0 159.172 3.920 -999.990 -999.990 1.592 ..P WKT 2010 05 01 19 14 55 31.3200 -97.3300 251.000 457.0 159.614 3.990 -999.990 -999.990 1.596 ..P WKT 2010 05 01 19 24 55 31.3200 -97.3300 251.000 30.0 153.304 3.510 -999.990 -999.990 1.533 ..P WKT 2010 05 01 19 29 55 31.3200 -97.3300 251.000 122.0 161.769 3.550 -999.990 -999.990 1.618 ..P WKT 2010 05 01 19 34 55 31.3200 -97.3300 251.000 457.0 158.338 3.150 -999.990 -999.990 1.583 ..P WKT 2010 05 01 19 39 55 31.3200 -97.3300 251.000 30.0 153.526 3.300 -999.990 -999.990 1.535 ..P WKT 2010 05 01 19 44 55 31.3200 -97.3300 251.000 122.0 156.180 3.220 -999.990 -999.990 1.562 ..P WKT 2010 05 01 19 49 55 31.3200 -97.3300 251.000 457.0 156.899 3.190 -999.990 -999.990 1.569 ..P WKT 2010 05 01 19 59 55 31.3200 -97.3300 251.000 30.0 156.125 3.070 -999.990 -999.990 1.561 ..P WKT 2010 05 01 20 04 55 31.3200 -97.3300 251.000 122.0 148.003 3.180 -999.990 -999.990 1.480 ..P WKT 2010 05 01 20 09 55 31.3200 -97.3300 251.000 457.0 153.694 3.760 -999.990 -999.990 1.537 ..P WKT 2010 05 01 20 14 55 31.3200 -97.3300 251.000 30.0 152.203 4.430 -999.990 -999.990 1.522 ..P WKT 2010 05 01 20 19 55 31.3200 -97.3300 251.000 122.0 157.616 5.230 -999.990 -999.990 1.576 ..P WKT 2010 05 01 20 24 55 31.3200 -97.3300 251.000 457.0 145.221 3.960 -999.990 -999.990 1.452 ..P WKT 2010 05 01 20 34 55 31.3200 -97.3300 251.000 30.0 149.380 3.760 -999.990 -999.990 1.494 ..P WKT 2010 05 01 20 39 55 31.3200 -97.3300 251.000 122.0 157.232 4.400 -999.990 -999.990 1.572 ..P WKT 2010 05 01 20 44 55 31.3200 -97.3300 251.000 457.0 152.531 4.000 -999.990 -999.990 1.525 ..P WKT 2010 05 01 20 49 55 31.3200 -97.3300 251.000 30.0 150.451 4.480 -999.990 -999.990 1.505 ..P WKT 2010 05 01 20 54 55 31.3200 -97.3300 251.000 122.0 153.473 3.420 -999.990 -999.990 1.535 ..P WKT 2010 05 01 20 59 55 31.3200 -97.3300 251.000 457.0 151.945 3.860 -999.990 -999.990 1.519 ..P WKT 2010 05 01 21 09 55 31.3200 -97.3300 251.000 30.0 152.317 3.840 -999.990 -999.990 1.523 ..P WKT 2010 05 01 21 14 55 31.3200 -97.3300 251.000 122.0 157.521 3.110 -999.990 -999.990 1.575 ..P WKT 2010 05 01 21 19 55 31.3200 -97.3300 251.000 457.0 154.734 3.250 -999.990 -999.990 1.547 ..P WKT 2010 05 01 21 24 55 31.3200 -97.3300 251.000 30.0 158.008 3.540 -999.990 -999.990 1.580 ..P WKT 2010 05 01 21 29 55 31.3200 -97.3300 251.000 122.0 153.433 3.480 -999.990 -999.990 1.534 ..P WKT 2010 05 01 21 34 55 31.3200 -97.3300 251.000 457.0 153.953 3.540 -999.990 -999.990 1.540 ..P WKT 2010 05 01 21 44 55 31.3200 -97.3300 251.000 30.0 156.662 5.540 -999.990 -999.990 1.567 ..P WKT 2010 05 01 21 49 55 31.3200 -97.3300 251.000 122.0 157.338 3.670 -999.990 -999.990 1.573 ..P WKT 2010 05 01 21 54 55 31.3200 -97.3300 251.000 457.0 152.512 5.240 -999.990 -999.990 1.525 ..P WKT 2010 05 01 21 59 55 31.3200 -97.3300 251.000 30.0 156.489 4.240 -999.990 -999.990 1.565 ..P WKT 2010 05 01 22 04 55 31.3200 -97.3300 251.000 122.0 158.401 4.050 -999.990 -999.990 1.584 ..P WKT 2010 05 01 22 09 55 31.3200 -97.3300 251.000 457.0 159.763 4.330 -999.990 -999.990 1.598 ..P WKT 2010 05 01 22 19 55 31.3200 -97.3300 251.000 30.0 162.271 4.560 -999.990 -999.990 1.623 ..P WKT 2010 05 01 22 24 55 31.3200 -97.3300 251.000 122.0 160.805 3.850 -999.990 -999.990 1.608 ..P WKT 2010 05 01 22 29 55 31.3200 -97.3300 251.000 457.0 157.418 4.230 -999.990 -999.990 1.574 ..P WKT 2010 05 01 22 34 55 31.3200 -97.3300 251.000 30.0 156.091 4.040 -999.990 -999.990 1.561 ..P WKT 2010 05 01 22 39 55 31.3200 -97.3300 251.000 122.0 157.236 3.870 -999.990 -999.990 1.572 ..P WKT 2010 05 01 22 44 55 31.3200 -97.3300 251.000 457.0 147.400 3.590 -999.990 -999.990 1.474 ..P WKT 2010 05 01 22 54 55 31.3200 -97.3300 251.000 30.0 151.653 3.280 -999.990 -999.990 1.517 ..P WKT 2010 05 01 22 59 55 31.3200 -97.3300 251.000 122.0 155.307 3.750 -999.990 -999.990 1.553 ..P WKT 2010 05 01 23 04 55 31.3200 -97.3300 251.000 457.0 147.438 3.850 -999.990 -999.990 1.474 ..P WKT 2010 05 01 23 09 55 31.3200 -97.3300 251.000 30.0 148.074 4.060 -999.990 -999.990 1.481 ..P WKT 2010 05 01 23 14 55 31.3200 -97.3300 251.000 122.0 153.646 4.770 -999.990 -999.990 1.536 ..P WKT 2010 05 01 23 19 55 31.3200 -97.3300 251.000 457.0 152.636 3.650 -999.990 -999.990 1.526 ..P WKT 2010 05 01 23 29 55 31.3200 -97.3300 251.000 30.0 157.145 3.680 -999.990 -999.990 1.571 ..P WKT 2010 05 01 23 34 55 31.3200 -97.3300 251.000 122.0 154.716 4.050 -999.990 -999.990 1.547 ..P WKT 2010 05 01 23 39 55 31.3200 -97.3300 251.000 457.0 152.014 4.200 -999.990 -999.990 1.520 ..P WKT 2010 05 01 23 44 55 31.3200 -97.3300 251.000 30.0 156.434 5.490 -999.990 -999.990 1.564 ..P WKT 2010 05 01 23 49 55 31.3200 -97.3300 251.000 122.0 158.388 4.300 -999.990 -999.990 1.584 ..P WKT 2010 05 02 00 09 55 31.3200 -97.3300 251.000 457.0 174.684 3.580 -999.990 -999.990 1.747 ..P WKT 2010 05 02 00 10 25 31.3200 -97.3300 251.000 457.0 173.749 4.190 -999.990 -999.990 1.737 ..P WKT 2010 05 02 00 10 55 31.3200 -97.3300 251.000 457.0 172.815 3.830 -999.990 -999.990 1.728 ..P WKT 2010 05 02 00 11 25 31.3200 -97.3300 251.000 457.0 171.880 4.460 -999.990 -999.990 1.719 ..P WKT 2010 05 02 00 11 55 31.3200 -97.3300 251.000 457.0 164.375 3.380 -999.990 -999.990 1.644 ..P WKT 2010 05 02 00 12 25 31.3200 -97.3300 251.000 457.0 172.749 4.150 -999.990 -999.990 1.727 ..P WKT 2010 05 02 00 12 55 31.3200 -97.3300 251.000 457.0 165.791 3.670 -999.990 -999.990 1.658 ..P WKT 2010 05 02 00 13 25 31.3200 -97.3300 251.000 457.0 171.154 3.970 -999.990 -999.990 1.712 ..P WKT 2010 05 02 00 13 55 31.3200 -97.3300 251.000 457.0 167.481 4.030 -999.990 -999.990 1.675 ..P WKT 2010 05 02 00 14 25 31.3200 -97.3300 251.000 457.0 171.476 3.630 -999.990 -999.990 1.715 ..P WKT 2010 05 02 00 14 55 31.3200 -97.3300 251.000 457.0 171.089 3.930 -999.990 -999.990 1.711 ..P WKT 2010 05 02 00 19 55 31.3200 -97.3300 251.000 30.0 160.099 4.210 -999.990 -999.990 1.601 ..P WKT 2010 05 02 00 24 55 31.3200 -97.3300 251.000 122.0 168.006 4.730 -999.990 -999.990 1.680 ..P WKT 2010 05 02 00 29 55 31.3200 -97.3300 251.000 457.0 166.326 5.740 -999.990 -999.990 1.663 ..P WKT 2010 05 02 00 34 55 31.3200 -97.3300 251.000 30.0 158.619 5.430 -999.990 -999.990 1.586 ..P WKT 2010 05 02 00 39 55 31.3200 -97.3300 251.000 122.0 161.596 4.660 -999.990 -999.990 1.616 ..P WKT 2010 05 02 00 44 55 31.3200 -97.3300 251.000 457.0 145.116 3.320 -999.990 -999.990 1.451 ..P WKT 2010 05 02 00 54 55 31.3200 -97.3300 251.000 30.0 157.866 4.210 -999.990 -999.990 1.579 ..P WKT 2010 05 02 00 59 55 31.3200 -97.3300 251.000 122.0 165.312 5.340 -999.990 -999.990 1.653 ..P WKT 2010 05 02 01 04 55 31.3200 -97.3300 251.000 457.0 146.436 6.100 -999.990 -999.990 1.464 ..P WKT 2010 05 02 01 09 55 31.3200 -97.3300 251.000 30.0 164.989 4.960 -999.990 -999.990 1.650 ..P WKT 2010 05 02 01 14 55 31.3200 -97.3300 251.000 122.0 153.788 3.520 -999.990 -999.990 1.538 ..P WKT 2010 05 02 01 19 55 31.3200 -97.3300 251.000 457.0 164.255 4.410 -999.990 -999.990 1.643 ..P WKT 2010 05 02 01 29 55 31.3200 -97.3300 251.000 30.0 172.085 4.000 -999.990 -999.990 1.721 ..P WKT 2010 05 02 01 34 55 31.3200 -97.3300 251.000 122.0 161.212 3.920 -999.990 -999.990 1.612 ..P WKT 2010 05 02 01 39 55 31.3200 -97.3300 251.000 457.0 148.552 4.680 -999.990 -999.990 1.486 ..P WKT 2010 05 02 01 44 55 31.3200 -97.3300 251.000 30.0 168.554 4.380 -999.990 -999.990 1.686 ..P WKT 2010 05 02 01 49 55 31.3200 -97.3300 251.000 122.0 151.225 3.980 -999.990 -999.990 1.512 ..P WKT 2010 05 02 01 54 55 31.3200 -97.3300 251.000 457.0 148.992 3.620 -999.990 -999.990 1.490 ..P WKT 2010 05 02 02 04 55 31.3200 -97.3300 251.000 30.0 155.943 6.140 -999.990 -999.990 1.559 ..P WKT 2010 05 02 02 09 55 31.3200 -97.3300 251.000 122.0 172.272 4.230 -999.990 -999.990 1.723 ..P WKT 2010 05 02 02 14 55 31.3200 -97.3300 251.000 457.0 139.565 4.580 -999.990 -999.990 1.396 ..P WKT 2010 05 02 02 19 55 31.3200 -97.3300 251.000 30.0 156.583 6.620 -999.990 -999.990 1.566 ..P WKT 2010 05 02 02 24 55 31.3200 -97.3300 251.000 122.0 159.040 3.540 -999.990 -999.990 1.590 ..P WKT 2010 05 02 02 29 55 31.3200 -97.3300 251.000 457.0 140.061 3.320 -999.990 -999.990 1.401 ..P WKT 2010 05 02 02 39 55 31.3200 -97.3300 251.000 30.0 159.348 3.360 -999.990 -999.990 1.593 ..P WKT 2010 05 02 02 44 55 31.3200 -97.3300 251.000 122.0 147.863 4.140 -999.990 -999.990 1.479 ..P WKT 2010 05 02 02 49 55 31.3200 -97.3300 251.000 457.0 139.400 3.600 -999.990 -999.990 1.394 ..P WKT 2010 05 02 02 54 55 31.3200 -97.3300 251.000 30.0 152.388 3.530 -999.990 -999.990 1.524 ..P WKT 2010 05 02 02 59 55 31.3200 -97.3300 251.000 122.0 137.595 3.190 -999.990 -999.990 1.376 ..P WKT 2010 05 02 03 04 55 31.3200 -97.3300 251.000 457.0 137.381 3.340 -999.990 -999.990 1.374 ..P WKT 2010 05 02 03 14 55 31.3200 -97.3300 251.000 30.0 155.193 2.940 -999.990 -999.990 1.552 ..P WKT 2010 05 02 03 19 55 31.3200 -97.3300 251.000 122.0 133.315 3.580 -999.990 -999.990 1.333 ..P WKT 2010 05 02 03 24 55 31.3200 -97.3300 251.000 457.0 136.757 4.050 -999.990 -999.990 1.368 ..P WKT 2010 05 02 03 29 55 31.3200 -97.3300 251.000 30.0 144.329 3.340 -999.990 -999.990 1.443 ..P WKT 2010 05 02 03 34 55 31.3200 -97.3300 251.000 122.0 138.412 3.450 -999.990 -999.990 1.384 ..P WKT 2010 05 02 03 39 55 31.3200 -97.3300 251.000 457.0 138.000 3.370 -999.990 -999.990 1.380 ..P WKT 2010 05 02 03 49 55 31.3200 -97.3300 251.000 30.0 147.132 3.610 -999.990 -999.990 1.471 ..P WKT 2010 05 02 03 54 55 31.3200 -97.3300 251.000 122.0 219.492 3.650 -999.990 -999.990 2.195 ..P WKT 2010 05 02 03 59 55 31.3200 -97.3300 251.000 457.0 145.839 3.240 -999.990 -999.990 1.458 ..P WKT 2010 05 02 04 04 55 31.3200 -97.3300 251.000 30.0 143.539 3.490 -999.990 -999.990 1.435 ..P WKT 2010 05 02 04 09 55 31.3200 -97.3300 251.000 122.0 143.443 3.400 -999.990 -999.990 1.434 ..P WKT 2010 05 02 04 14 55 31.3200 -97.3300 251.000 457.0 141.693 3.290 -999.990 -999.990 1.417 ..P WKT 2010 05 02 04 24 55 31.3200 -97.3300 251.000 30.0 141.224 3.370 -999.990 -999.990 1.412 ..P WKT 2010 05 02 04 29 55 31.3200 -97.3300 251.000 122.0 142.644 3.150 -999.990 -999.990 1.426 ..P WKT 2010 05 02 04 34 55 31.3200 -97.3300 251.000 457.0 138.549 5.200 -999.990 -999.990 1.385 ..P WKT 2010 05 02 04 39 55 31.3200 -97.3300 251.000 30.0 144.934 4.000 -999.990 -999.990 1.449 ..P WKT 2010 05 02 04 44 55 31.3200 -97.3300 251.000 122.0 144.286 4.140 -999.990 -999.990 1.443 ..P WKT 2010 05 02 04 49 55 31.3200 -97.3300 251.000 457.0 139.913 3.220 -999.990 -999.990 1.399 ..P WKT 2010 05 02 05 04 55 31.3200 -97.3300 251.000 30.0 146.312 3.140 -999.990 -999.990 1.463 ..P WKT 2010 05 02 05 09 55 31.3200 -97.3300 251.000 122.0 143.073 3.260 -999.990 -999.990 1.431 ..P WKT 2010 05 02 05 14 55 31.3200 -97.3300 251.000 457.0 139.833 3.740 -999.990 -999.990 1.398 ..P WKT 2010 05 02 05 19 55 31.3200 -97.3300 251.000 30.0 158.960 4.020 -999.990 -999.990 1.590 ..P WKT 2010 05 02 05 24 55 31.3200 -97.3300 251.000 122.0 141.913 4.180 -999.990 -999.990 1.419 ..P WKT 2010 05 02 05 29 55 31.3200 -97.3300 251.000 457.0 137.981 3.730 -999.990 -999.990 1.380 ..P WKT 2010 05 02 05 39 55 31.3200 -97.3300 251.000 30.0 169.119 4.020 -999.990 -999.990 1.691 ..P WKT 2010 05 02 05 44 55 31.3200 -97.3300 251.000 122.0 148.380 4.050 -999.990 -999.990 1.484 ..P WKT 2010 05 02 05 49 55 31.3200 -97.3300 251.000 457.0 141.316 3.880 -999.990 -999.990 1.413 ..P WKT 2010 05 02 05 54 55 31.3200 -97.3300 251.000 30.0 167.419 4.830 -999.990 -999.990 1.674 ..P WKT 2010 05 02 05 59 55 31.3200 -97.3300 251.000 122.0 142.662 4.390 -999.990 -999.990 1.427 ..P WKT 2010 05 02 06 04 55 31.3200 -97.3300 251.000 457.0 139.880 5.300 -999.990 -999.990 1.399 ..P WKT 2010 05 02 06 14 55 31.3200 -97.3300 251.000 30.0 168.350 4.750 -999.990 -999.990 1.683 ..P WKT 2010 05 02 06 19 55 31.3200 -97.3300 251.000 122.0 147.333 4.120 -999.990 -999.990 1.473 ..P WKT 2010 05 02 06 24 55 31.3200 -97.3300 251.000 457.0 138.622 4.080 -999.990 -999.990 1.386 ..P WKT 2010 05 02 06 29 55 31.3200 -97.3300 251.000 30.0 153.979 4.990 -999.990 -999.990 1.540 ..P WKT 2010 05 02 06 34 55 31.3200 -97.3300 251.000 122.0 142.223 4.100 -999.990 -999.990 1.422 ..P WKT 2010 05 02 06 39 55 31.3200 -97.3300 251.000 457.0 136.274 3.770 -999.990 -999.990 1.363 ..P WKT 2010 05 02 06 49 55 31.3200 -97.3300 251.000 30.0 146.757 3.480 -999.990 -999.990 1.468 ..P WKT 2010 05 02 06 54 55 31.3200 -97.3300 251.000 122.0 141.874 5.140 -999.990 -999.990 1.419 ..P WKT 2010 05 02 06 59 55 31.3200 -97.3300 251.000 457.0 139.207 3.810 -999.990 -999.990 1.392 ..P WKT 2010 05 02 07 04 55 31.3200 -97.3300 251.000 30.0 149.831 4.370 -999.990 -999.990 1.498 ..P WKT 2010 05 02 07 09 55 31.3200 -97.3300 251.000 122.0 146.332 3.280 -999.990 -999.990 1.463 ..P WKT 2010 05 02 07 14 55 31.3200 -97.3300 251.000 457.0 132.029 3.490 -999.990 -999.990 1.320 ..P WKT 2010 05 02 07 24 55 31.3200 -97.3300 251.000 30.0 149.804 3.540 -999.990 -999.990 1.498 ..P WKT 2010 05 02 07 29 55 31.3200 -97.3300 251.000 122.0 139.216 3.650 -999.990 -999.990 1.392 ..P WKT 2010 05 02 07 34 55 31.3200 -97.3300 251.000 457.0 133.061 3.430 -999.990 -999.990 1.331 ..P WKT 2010 05 02 07 39 55 31.3200 -97.3300 251.000 30.0 147.141 2.830 -999.990 -999.990 1.471 ..P WKT 2010 05 02 07 44 55 31.3200 -97.3300 251.000 122.0 145.697 4.110 -999.990 -999.990 1.457 ..P WKT 2010 05 02 07 49 55 31.3200 -97.3300 251.000 457.0 135.935 3.390 -999.990 -999.990 1.359 ..P WKT 2010 05 02 07 59 55 31.3200 -97.3300 251.000 30.0 144.318 2.760 -999.990 -999.990 1.443 ..P WKT 2010 05 02 08 04 55 31.3200 -97.3300 251.000 122.0 136.395 2.950 -999.990 -999.990 1.364 ..P WKT 2010 05 02 08 09 55 31.3200 -97.3300 251.000 457.0 132.908 4.470 -999.990 -999.990 1.329 ..P WKT 2010 05 02 08 14 55 31.3200 -97.3300 251.000 30.0 146.347 3.800 -999.990 -999.990 1.463 ..P WKT 2010 05 02 08 19 55 31.3200 -97.3300 251.000 122.0 145.220 4.040 -999.990 -999.990 1.452 ..P WKT 2010 05 02 08 24 55 31.3200 -97.3300 251.000 457.0 138.124 3.660 -999.990 -999.990 1.381 ..P WKT 2010 05 02 08 34 55 31.3200 -97.3300 251.000 30.0 148.975 3.560 -999.990 -999.990 1.490 ..P WKT 2010 05 02 08 39 55 31.3200 -97.3300 251.000 122.0 144.992 4.630 -999.990 -999.990 1.450 ..P WKT 2010 05 02 08 44 55 31.3200 -97.3300 251.000 457.0 135.868 3.680 -999.990 -999.990 1.359 ..P WKT 2010 05 02 08 49 55 31.3200 -97.3300 251.000 30.0 149.659 3.630 -999.990 -999.990 1.497 ..P WKT 2010 05 02 08 54 55 31.3200 -97.3300 251.000 122.0 143.312 3.720 -999.990 -999.990 1.433 ..P WKT 2010 05 02 08 59 55 31.3200 -97.3300 251.000 457.0 137.936 3.480 -999.990 -999.990 1.379 ..P WKT 2010 05 02 09 09 55 31.3200 -97.3300 251.000 30.0 155.388 3.190 -999.990 -999.990 1.554 ..P WKT 2010 05 02 09 14 55 31.3200 -97.3300 251.000 122.0 140.005 3.060 -999.990 -999.990 1.400 ..P WKT 2010 05 02 09 19 55 31.3200 -97.3300 251.000 457.0 133.653 5.370 -999.990 -999.990 1.337 ..P WKT 2010 05 02 09 24 55 31.3200 -97.3300 251.000 30.0 142.035 3.940 -999.990 -999.990 1.420 ..P WKT 2010 05 02 09 29 55 31.3200 -97.3300 251.000 122.0 134.430 3.280 -999.990 -999.990 1.344 ..P WKT 2010 05 02 09 34 55 31.3200 -97.3300 251.000 457.0 138.781 3.280 -999.990 -999.990 1.388 ..P WKT 2010 05 02 09 44 55 31.3200 -97.3300 251.000 30.0 144.844 3.400 -999.990 -999.990 1.448 ..P WKT 2010 05 02 09 49 55 31.3200 -97.3300 251.000 122.0 132.506 3.510 -999.990 -999.990 1.325 ..P WKT 2010 05 02 09 54 55 31.3200 -97.3300 251.000 457.0 143.398 3.830 -999.990 -999.990 1.434 ..P WKT 2010 05 02 09 59 55 31.3200 -97.3300 251.000 30.0 143.023 3.530 -999.990 -999.990 1.430 ..P WKT 2010 05 02 10 04 55 31.3200 -97.3300 251.000 122.0 138.194 3.380 -999.990 -999.990 1.382 ..P WKT 2010 05 02 10 09 55 31.3200 -97.3300 251.000 457.0 138.931 3.860 -999.990 -999.990 1.389 ..P WKT 2010 05 02 10 19 55 31.3200 -97.3300 251.000 30.0 146.751 4.690 -999.990 -999.990 1.468 ..P WKT 2010 05 02 10 24 55 31.3200 -97.3300 251.000 122.0 138.240 3.910 -999.990 -999.990 1.382 ..P WKT 2010 05 02 10 29 55 31.3200 -97.3300 251.000 457.0 131.398 3.690 -999.990 -999.990 1.314 ..P WKT 2010 05 02 10 34 55 31.3200 -97.3300 251.000 30.0 134.582 4.200 -999.990 -999.990 1.346 ..P WKT 2010 05 02 10 39 55 31.3200 -97.3300 251.000 122.0 133.588 3.480 -999.990 -999.990 1.336 ..P WKT 2010 05 02 10 44 55 31.3200 -97.3300 251.000 457.0 135.659 3.230 -999.990 -999.990 1.357 ..P WKT 2010 05 02 10 54 55 31.3200 -97.3300 251.000 30.0 140.778 4.990 -999.990 -999.990 1.408 ..P WKT 2010 05 02 10 59 55 31.3200 -97.3300 251.000 122.0 131.561 2.980 -999.990 -999.990 1.316 ..P WKT 2010 05 02 11 04 55 31.3200 -97.3300 251.000 457.0 137.117 3.870 -999.990 -999.990 1.371 ..P WKT 2010 05 02 11 09 55 31.3200 -97.3300 251.000 30.0 155.502 2.970 -999.990 -999.990 1.555 ..P WKT 2010 05 02 11 14 55 31.3200 -97.3300 251.000 122.0 142.379 6.270 -999.990 -999.990 1.424 ..P WKT 2010 05 02 11 19 55 31.3200 -97.3300 251.000 457.0 144.034 3.150 -999.990 -999.990 1.440 ..P WKT 2010 05 02 11 29 55 31.3200 -97.3300 251.000 30.0 145.644 2.860 -999.990 -999.990 1.456 ..P WKT 2010 05 02 11 34 55 31.3200 -97.3300 251.000 122.0 142.248 3.050 -999.990 -999.990 1.422 ..P WKT 2010 05 02 11 39 55 31.3200 -97.3300 251.000 457.0 137.177 3.100 -999.990 -999.990 1.372 ..P WKT 2010 05 02 11 44 55 31.3200 -97.3300 251.000 30.0 149.688 4.510 -999.990 -999.990 1.497 ..P WKT 2010 05 02 11 49 55 31.3200 -97.3300 251.000 122.0 145.733 3.840 -999.990 -999.990 1.457 ..P WKT 2010 05 02 12 09 55 31.3200 -97.3300 251.000 457.0 135.402 4.590 -999.990 -999.990 1.354 ..P WKT 2010 05 02 12 10 25 31.3200 -97.3300 251.000 457.0 138.406 3.700 -999.990 -999.990 1.384 ..P WKT 2010 05 02 12 10 55 31.3200 -97.3300 251.000 457.0 136.384 3.340 -999.990 -999.990 1.364 ..P WKT 2010 05 02 12 11 25 31.3200 -97.3300 251.000 457.0 138.830 3.350 -999.990 -999.990 1.388 ..P WKT 2010 05 02 12 11 55 31.3200 -97.3300 251.000 457.0 137.925 3.350 -999.990 -999.990 1.379 ..P WKT 2010 05 02 12 12 25 31.3200 -97.3300 251.000 457.0 135.623 3.890 -999.990 -999.990 1.356 ..P WKT 2010 05 02 12 12 55 31.3200 -97.3300 251.000 457.0 132.762 3.860 -999.990 -999.990 1.328 ..P WKT 2010 05 02 12 13 25 31.3200 -97.3300 251.000 457.0 134.371 3.870 -999.990 -999.990 1.344 ..P WKT 2010 05 02 12 13 55 31.3200 -97.3300 251.000 457.0 133.186 3.700 -999.990 -999.990 1.332 ..P WKT 2010 05 02 12 14 25 31.3200 -97.3300 251.000 457.0 134.795 3.520 -999.990 -999.990 1.348 ..P WKT 2010 05 02 12 14 55 31.3200 -97.3300 251.000 457.0 137.940 3.470 -999.990 -999.990 1.379 ..P WKT 2010 05 02 12 19 55 31.3200 -97.3300 251.000 30.0 145.367 4.150 -999.990 -999.990 1.454 ..P WKT 2010 05 02 12 24 55 31.3200 -97.3300 251.000 122.0 142.738 4.030 -999.990 -999.990 1.427 ..P WKT 2010 05 02 12 29 55 31.3200 -97.3300 251.000 457.0 142.204 4.660 -999.990 -999.990 1.422 ..P WKT 2010 05 02 12 34 55 31.3200 -97.3300 251.000 30.0 139.575 4.320 -999.990 -999.990 1.396 ..P WKT 2010 05 02 12 39 55 31.3200 -97.3300 251.000 122.0 138.900 3.960 -999.990 -999.990 1.389 ..P WKT 2010 05 02 12 44 55 31.3200 -97.3300 251.000 457.0 136.269 4.300 -999.990 -999.990 1.363 ..P WKT 2010 05 02 12 54 55 31.3200 -97.3300 251.000 30.0 139.198 3.940 -999.990 -999.990 1.392 ..P WKT 2010 05 02 12 59 55 31.3200 -97.3300 251.000 122.0 138.048 3.670 -999.990 -999.990 1.380 ..P WKT 2010 05 02 13 04 55 31.3200 -97.3300 251.000 457.0 137.878 3.670 -999.990 -999.990 1.379 ..P WKT 2010 05 02 13 09 55 31.3200 -97.3300 251.000 30.0 136.169 4.470 -999.990 -999.990 1.362 ..P WKT 2010 05 02 13 14 55 31.3200 -97.3300 251.000 122.0 138.794 3.160 -999.990 -999.990 1.388 ..P WKT 2010 05 02 13 19 55 31.3200 -97.3300 251.000 457.0 133.589 3.040 -999.990 -999.990 1.336 ..P WKT 2010 05 02 13 29 55 31.3200 -97.3300 251.000 30.0 141.700 3.120 -999.990 -999.990 1.417 ..P WKT 2010 05 02 13 34 55 31.3200 -97.3300 251.000 122.0 140.470 3.540 -999.990 -999.990 1.405 ..P WKT 2010 05 02 13 39 55 31.3200 -97.3300 251.000 457.0 141.199 3.730 -999.990 -999.990 1.412 ..P WKT 2010 05 02 13 44 55 31.3200 -97.3300 251.000 30.0 137.029 3.690 -999.990 -999.990 1.370 ..P WKT 2010 05 02 13 49 55 31.3200 -97.3300 251.000 122.0 135.099 4.490 -999.990 -999.990 1.351 ..P WKT 2010 05 02 13 54 55 31.3200 -97.3300 251.000 457.0 134.008 2.960 -999.990 -999.990 1.340 ..P WKT 2010 05 02 14 04 55 31.3200 -97.3300 251.000 30.0 141.185 2.970 -999.990 -999.990 1.412 ..P WKT 2010 05 02 14 09 55 31.3200 -97.3300 251.000 122.0 141.194 3.840 -999.990 -999.990 1.412 ..P WKT 2010 05 02 14 14 55 31.3200 -97.3300 251.000 457.0 134.902 3.510 -999.990 -999.990 1.349 ..P WKT 2010 05 02 14 19 55 31.3200 -97.3300 251.000 30.0 140.512 4.680 -999.990 -999.990 1.405 ..P WKT 2010 05 02 14 24 55 31.3200 -97.3300 251.000 122.0 139.962 4.530 -999.990 -999.990 1.400 ..P WKT 2010 05 02 14 29 55 31.3200 -97.3300 251.000 457.0 140.251 4.950 -999.990 -999.990 1.403 ..P WKT 2010 05 02 14 39 55 31.3200 -97.3300 251.000 30.0 152.919 4.900 -999.990 -999.990 1.529 ..P WKT 2010 05 02 14 44 55 31.3200 -97.3300 251.000 122.0 131.670 4.200 -999.990 -999.990 1.317 ..P WKT 2010 05 02 14 49 55 31.3200 -97.3300 251.000 457.0 137.885 4.740 -999.990 -999.990 1.379 ..P WKT 2010 05 02 14 54 55 31.3200 -97.3300 251.000 30.0 145.502 3.710 -999.990 -999.990 1.455 ..P WKT 2010 05 02 14 59 55 31.3200 -97.3300 251.000 122.0 142.468 3.470 -999.990 -999.990 1.425 ..P WKT 2010 05 02 15 04 55 31.3200 -97.3300 251.000 457.0 136.910 3.050 -999.990 -999.990 1.369 ..P WKT 2010 05 02 15 14 55 31.3200 -97.3300 251.000 30.0 145.981 3.080 -999.990 -999.990 1.460 ..P WKT 2010 05 02 15 19 55 31.3200 -97.3300 251.000 122.0 143.788 4.120 -999.990 -999.990 1.438 ..P WKT 2010 05 02 15 24 55 31.3200 -97.3300 251.000 457.0 133.739 3.350 -999.990 -999.990 1.337 ..P WKT 2010 05 02 15 29 55 31.3200 -97.3300 251.000 30.0 162.401 3.420 -999.990 -999.990 1.624 ..P WKT 2010 05 02 15 34 55 31.3200 -97.3300 251.000 122.0 148.986 3.790 -999.990 -999.990 1.490 ..P WKT 2010 05 02 15 39 55 31.3200 -97.3300 251.000 457.0 138.655 3.880 -999.990 -999.990 1.387 ..P WKT 2010 05 02 15 49 55 31.3200 -97.3300 251.000 30.0 162.307 3.510 -999.990 -999.990 1.623 ..P WKT 2010 05 02 15 54 55 31.3200 -97.3300 251.000 122.0 151.112 3.980 -999.990 -999.990 1.511 ..P WKT 2010 05 02 15 59 55 31.3200 -97.3300 251.000 457.0 149.177 3.710 -999.990 -999.990 1.492 ..P WKT 2010 05 02 16 04 55 31.3200 -97.3300 251.000 30.0 173.069 3.320 -999.990 -999.990 1.731 ..P WKT 2010 05 02 16 09 55 31.3200 -97.3300 251.000 122.0 171.699 3.330 -999.990 -999.990 1.717 ..P WKT 2010 05 02 16 14 55 31.3200 -97.3300 251.000 457.0 140.002 3.360 -999.990 -999.990 1.400 ..P WKT 2010 05 02 16 24 55 31.3200 -97.3300 251.000 30.0 152.338 3.880 -999.990 -999.990 1.523 ..P WKT 2010 05 02 16 29 55 31.3200 -97.3300 251.000 122.0 142.879 3.270 -999.990 -999.990 1.429 ..P WKT 2010 05 02 16 34 55 31.3200 -97.3300 251.000 457.0 136.648 3.300 -999.990 -999.990 1.366 ..P WKT 2010 05 02 16 39 55 31.3200 -97.3300 251.000 30.0 147.412 3.410 -999.990 -999.990 1.474 ..P WKT 2010 05 02 16 44 55 31.3200 -97.3300 251.000 122.0 148.345 3.660 -999.990 -999.990 1.483 ..P WKT 2010 05 02 16 49 55 31.3200 -97.3300 251.000 457.0 145.626 3.570 -999.990 -999.990 1.456 ..P WKT 2010 05 02 17 04 55 31.3200 -97.3300 251.000 30.0 146.754 3.420 -999.990 -999.990 1.468 ..P WKT 2010 05 02 17 09 55 31.3200 -97.3300 251.000 122.0 151.350 3.650 -999.990 -999.990 1.514 ..P WKT 2010 05 02 17 14 55 31.3200 -97.3300 251.000 457.0 146.669 3.810 -999.990 -999.990 1.467 ..P WKT 2010 05 02 17 19 55 31.3200 -97.3300 251.000 30.0 146.345 3.230 -999.990 -999.990 1.463 ..P WKT 2010 05 02 17 24 55 31.3200 -97.3300 251.000 122.0 150.661 3.660 -999.990 -999.990 1.507 ..P WKT 2010 05 02 17 29 55 31.3200 -97.3300 251.000 457.0 145.978 3.200 -999.990 -999.990 1.460 ..P WKT 2010 05 02 17 39 55 31.3200 -97.3300 251.000 30.0 158.383 4.480 -999.990 -999.990 1.584 ..P WKT 2010 05 02 17 44 55 31.3200 -97.3300 251.000 122.0 155.500 3.790 -999.990 -999.990 1.555 ..P WKT 2010 05 02 17 49 55 31.3200 -97.3300 251.000 457.0 154.727 3.650 -999.990 -999.990 1.547 ..P WKT 2010 05 02 17 54 55 31.3200 -97.3300 251.000 30.0 156.346 3.320 -999.990 -999.990 1.563 ..P WKT 2010 05 02 17 59 55 31.3200 -97.3300 251.000 122.0 158.950 6.180 -999.990 -999.990 1.589 ..P WKT 2010 05 02 18 04 55 31.3200 -97.3300 251.000 457.0 150.296 3.980 -999.990 -999.990 1.503 ..P WKT 2010 05 02 18 14 55 31.3200 -97.3300 251.000 30.0 153.936 3.900 -999.990 -999.990 1.539 ..P WKT 2010 05 02 18 19 55 31.3200 -97.3300 251.000 122.0 161.026 4.220 -999.990 -999.990 1.610 ..P WKT 2010 05 02 18 24 55 31.3200 -97.3300 251.000 457.0 155.446 3.660 -999.990 -999.990 1.554 ..P WKT 2010 05 02 18 29 55 31.3200 -97.3300 251.000 30.0 159.440 4.000 -999.990 -999.990 1.594 ..P WKT 2010 05 02 18 34 55 31.3200 -97.3300 251.000 122.0 151.324 4.090 -999.990 -999.990 1.513 ..P WKT 2010 05 02 18 39 55 31.3200 -97.3300 251.000 457.0 145.741 3.950 -999.990 -999.990 1.457 ..P WKT 2010 05 02 18 49 55 31.3200 -97.3300 251.000 30.0 152.965 4.000 -999.990 -999.990 1.530 ..P WKT 2010 05 02 18 54 55 31.3200 -97.3300 251.000 122.0 152.251 3.690 -999.990 -999.990 1.523 ..P WKT 2010 05 02 18 59 55 31.3200 -97.3300 251.000 457.0 145.337 4.170 -999.990 -999.990 1.453 ..P WKT 2010 05 02 19 04 55 31.3200 -97.3300 251.000 30.0 146.314 4.010 -999.990 -999.990 1.463 ..P WKT 2010 05 02 19 09 55 31.3200 -97.3300 251.000 122.0 146.726 3.480 -999.990 -999.990 1.467 ..P WKT 2010 05 02 19 14 55 31.3200 -97.3300 251.000 457.0 136.708 3.430 -999.990 -999.990 1.367 ..P WKT 2010 05 02 19 24 55 31.3200 -97.3300 251.000 30.0 142.526 3.410 -999.990 -999.990 1.425 ..P WKT 2010 05 02 19 29 55 31.3200 -97.3300 251.000 122.0 142.576 4.190 -999.990 -999.990 1.426 ..P WKT 2010 05 02 19 34 55 31.3200 -97.3300 251.000 457.0 142.343 3.910 -999.990 -999.990 1.423 ..P WKT 2010 05 02 19 39 55 31.3200 -97.3300 251.000 30.0 142.957 4.330 -999.990 -999.990 1.430 ..P WKT 2010 05 02 19 44 55 31.3200 -97.3300 251.000 122.0 143.008 4.670 -999.990 -999.990 1.430 ..P WKT 2010 05 02 19 49 55 31.3200 -97.3300 251.000 457.0 138.261 4.080 -999.990 -999.990 1.383 ..P WKT 2010 05 02 19 59 55 31.3200 -97.3300 251.000 30.0 139.287 4.100 -999.990 -999.990 1.393 ..P WKT 2010 05 02 20 04 55 31.3200 -97.3300 251.000 122.0 146.472 3.910 -999.990 -999.990 1.465 ..P WKT 2010 05 02 20 09 55 31.3200 -97.3300 251.000 457.0 141.664 5.920 -999.990 -999.990 1.417 ..P WKT 2010 05 02 20 14 55 31.3200 -97.3300 251.000 30.0 138.831 4.470 -999.990 -999.990 1.388 ..P WKT 2010 05 02 20 19 55 31.3200 -97.3300 251.000 122.0 140.372 4.120 -999.990 -999.990 1.404 ..P WKT 2010 05 02 20 24 55 31.3200 -97.3300 251.000 457.0 136.691 3.420 -999.990 -999.990 1.367 ..P WKT 2010 05 02 20 34 55 31.3200 -97.3300 251.000 30.0 137.959 3.570 -999.990 -999.990 1.380 ..P WKT 2010 05 02 20 39 55 31.3200 -97.3300 251.000 122.0 137.968 4.070 -999.990 -999.990 1.380 ..P WKT 2010 05 02 20 44 55 31.3200 -97.3300 251.000 457.0 133.599 4.320 -999.990 -999.990 1.336 ..P WKT 2010 05 02 20 49 55 31.3200 -97.3300 251.000 30.0 142.224 3.760 -999.990 -999.990 1.422 ..P WKT 2010 05 02 20 54 55 31.3200 -97.3300 251.000 122.0 139.549 4.370 -999.990 -999.990 1.395 ..P WKT 2010 05 02 20 59 55 31.3200 -97.3300 251.000 457.0 141.253 3.980 -999.990 -999.990 1.413 ..P WKT 2010 05 02 21 09 55 31.3200 -97.3300 251.000 30.0 141.837 4.010 -999.990 -999.990 1.418 ..P WKT 2010 05 02 21 14 55 31.3200 -97.3300 251.000 122.0 145.945 4.110 -999.990 -999.990 1.459 ..P WKT 2010 05 02 21 19 55 31.3200 -97.3300 251.000 457.0 138.747 4.540 -999.990 -999.990 1.387 ..P WKT 2010 05 02 21 24 55 31.3200 -97.3300 251.000 30.0 142.148 4.350 -999.990 -999.990 1.421 ..P WKT 2010 05 02 21 29 55 31.3200 -97.3300 251.000 122.0 142.723 4.760 -999.990 -999.990 1.427 ..P WKT 2010 05 02 21 34 55 31.3200 -97.3300 251.000 457.0 141.460 5.220 -999.990 -999.990 1.415 ..P WKT 2010 05 02 21 44 55 31.3200 -97.3300 251.000 30.0 140.469 3.750 -999.990 -999.990 1.405 ..P WKT 2010 05 02 21 49 55 31.3200 -97.3300 251.000 122.0 143.852 4.740 -999.990 -999.990 1.439 ..P WKT 2010 05 02 21 54 55 31.3200 -97.3300 251.000 457.0 139.457 3.960 -999.990 -999.990 1.395 ..P WKT 2010 05 02 21 59 55 31.3200 -97.3300 251.000 30.0 141.992 3.640 -999.990 -999.990 1.420 ..P WKT 2010 05 02 22 04 55 31.3200 -97.3300 251.000 122.0 145.519 3.780 -999.990 -999.990 1.455 ..P WKT 2010 05 02 22 09 55 31.3200 -97.3300 251.000 457.0 134.472 5.090 -999.990 -999.990 1.345 ..P WKT 2010 05 02 22 19 55 31.3200 -97.3300 251.000 30.0 141.889 3.500 -999.990 -999.990 1.419 ..P WKT 2010 05 02 22 24 55 31.3200 -97.3300 251.000 122.0 138.138 3.530 -999.990 -999.990 1.381 ..P WKT 2010 05 02 22 29 55 31.3200 -97.3300 251.000 457.0 136.650 4.250 -999.990 -999.990 1.367 ..P WKT 2010 05 02 22 34 55 31.3200 -97.3300 251.000 30.0 137.427 4.240 -999.990 -999.990 1.374 ..P WKT 2010 05 02 22 39 55 31.3200 -97.3300 251.000 122.0 137.355 3.940 -999.990 -999.990 1.374 ..P WKT 2010 05 02 22 44 55 31.3200 -97.3300 251.000 457.0 140.115 4.500 -999.990 -999.990 1.401 ..P WKT 2010 05 02 22 54 55 31.3200 -97.3300 251.000 30.0 134.428 4.220 -999.990 -999.990 1.344 ..P WKT 2010 05 02 22 59 55 31.3200 -97.3300 251.000 122.0 137.310 4.030 -999.990 -999.990 1.373 ..P WKT 2010 05 02 23 04 55 31.3200 -97.3300 251.000 457.0 134.243 6.940 -999.990 -999.990 1.342 ..P WKT 2010 05 02 23 09 55 31.3200 -97.3300 251.000 30.0 140.809 5.500 -999.990 -999.990 1.408 ..P WKT 2010 05 02 23 14 55 31.3200 -97.3300 251.000 122.0 140.292 3.740 -999.990 -999.990 1.403 ..P WKT 2010 05 02 23 19 55 31.3200 -97.3300 251.000 457.0 137.508 4.020 -999.990 -999.990 1.375 ..P WKT 2010 05 02 23 29 55 31.3200 -97.3300 251.000 30.0 142.367 3.560 -999.990 -999.990 1.424 ..P WKT 2010 05 02 23 34 55 31.3200 -97.3300 251.000 122.0 138.390 3.590 -999.990 -999.990 1.384 ..P WKT 2010 05 02 23 39 55 31.3200 -97.3300 251.000 457.0 141.217 4.280 -999.990 -999.990 1.412 ..P WKT 2010 05 02 23 44 55 31.3200 -97.3300 251.000 30.0 133.836 4.560 -999.990 -999.990 1.338 ..P WKT 2010 05 02 23 49 55 31.3200 -97.3300 251.000 122.0 142.051 4.370 -999.990 -999.990 1.421 ..P WKT 2010 05 03 00 09 55 31.3200 -97.3300 251.000 457.0 139.150 4.820 -999.990 -999.990 1.392 ..P WKT 2010 05 03 00 10 25 31.3200 -97.3300 251.000 457.0 143.033 4.120 -999.990 -999.990 1.430 ..P WKT 2010 05 03 00 10 55 31.3200 -97.3300 251.000 457.0 133.731 5.270 -999.990 -999.990 1.337 ..P WKT 2010 05 03 00 11 25 31.3200 -97.3300 251.000 457.0 135.630 4.180 -999.990 -999.990 1.356 ..P WKT 2010 05 03 00 11 55 31.3200 -97.3300 251.000 457.0 142.488 4.110 -999.990 -999.990 1.425 ..P WKT 2010 05 03 00 12 25 31.3200 -97.3300 251.000 457.0 140.559 3.760 -999.990 -999.990 1.406 ..P WKT 2010 05 03 00 12 55 31.3200 -97.3300 251.000 457.0 134.519 4.480 -999.990 -999.990 1.345 ..P WKT 2010 05 03 00 13 25 31.3200 -97.3300 251.000 457.0 138.685 4.460 -999.990 -999.990 1.387 ..P WKT 2010 05 03 00 13 55 31.3200 -97.3300 251.000 457.0 138.881 4.020 -999.990 -999.990 1.389 ..P WKT 2010 05 03 00 14 25 31.3200 -97.3300 251.000 457.0 137.235 4.050 -999.990 -999.990 1.372 ..P WKT 2010 05 03 00 14 55 31.3200 -97.3300 251.000 457.0 137.999 3.960 -999.990 -999.990 1.380 ..P WKT 2010 05 03 00 19 55 31.3200 -97.3300 251.000 30.0 144.783 4.520 -999.990 -999.990 1.448 ..P WKT 2010 05 03 00 24 55 31.3200 -97.3300 251.000 122.0 141.364 4.400 -999.990 -999.990 1.414 ..P WKT 2010 05 03 00 29 55 31.3200 -97.3300 251.000 457.0 135.113 4.960 -999.990 -999.990 1.351 ..P WKT 2010 05 03 00 34 55 31.3200 -97.3300 251.000 30.0 136.370 4.820 -999.990 -999.990 1.364 ..P WKT 2010 05 03 00 39 55 31.3200 -97.3300 251.000 122.0 131.116 3.850 -999.990 -999.990 1.311 ..P WKT 2010 05 03 00 44 55 31.3200 -97.3300 251.000 457.0 126.005 4.440 -999.990 -999.990 1.260 ..P WKT 2010 05 03 00 54 55 31.3200 -97.3300 251.000 30.0 135.958 4.020 -999.990 -999.990 1.360 ..P WKT 2010 05 03 00 59 55 31.3200 -97.3300 251.000 122.0 131.637 3.990 -999.990 -999.990 1.316 ..P WKT 2010 05 03 01 04 55 31.3200 -97.3300 251.000 457.0 129.581 4.370 -999.990 -999.990 1.296 ..P WKT 2010 05 03 01 09 55 31.3200 -97.3300 251.000 30.0 135.725 5.130 -999.990 -999.990 1.357 ..P WKT 2010 05 03 01 14 55 31.3200 -97.3300 251.000 122.0 140.170 5.070 -999.990 -999.990 1.402 ..P WKT 2010 05 03 01 19 55 31.3200 -97.3300 251.000 457.0 133.592 4.990 -999.990 -999.990 1.336 ..P WKT 2010 05 03 01 29 55 31.3200 -97.3300 251.000 30.0 141.125 4.100 -999.990 -999.990 1.411 ..P WKT 2010 05 03 01 34 55 31.3200 -97.3300 251.000 122.0 139.130 3.680 -999.990 -999.990 1.391 ..P WKT 2010 05 03 01 39 55 31.3200 -97.3300 251.000 457.0 138.688 3.460 -999.990 -999.990 1.387 ..P WKT 2010 05 03 01 44 55 31.3200 -97.3300 251.000 30.0 137.823 3.530 -999.990 -999.990 1.378 ..P WKT 2010 05 03 01 49 55 31.3200 -97.3300 251.000 122.0 136.395 3.620 -999.990 -999.990 1.364 ..P WKT 2010 05 03 01 54 55 31.3200 -97.3300 251.000 457.0 136.096 3.530 -999.990 -999.990 1.361 ..P WKT 2010 05 03 02 04 55 31.3200 -97.3300 251.000 30.0 140.171 4.000 -999.990 -999.990 1.402 ..P WKT 2010 05 03 02 09 55 31.3200 -97.3300 251.000 122.0 132.419 4.540 -999.990 -999.990 1.324 ..P WKT 2010 05 03 02 14 55 31.3200 -97.3300 251.000 457.0 139.048 3.570 -999.990 -999.990 1.390 ..P WKT 2010 05 03 02 19 55 31.3200 -97.3300 251.000 30.0 136.655 3.220 -999.990 -999.990 1.367 ..P WKT 2010 05 03 02 24 55 31.3200 -97.3300 251.000 122.0 136.235 3.310 -999.990 -999.990 1.362 ..P WKT 2010 05 03 02 29 55 31.3200 -97.3300 251.000 457.0 135.534 3.180 -999.990 -999.990 1.355 ..P WKT 2010 05 03 02 39 55 31.3200 -97.3300 251.000 30.0 130.512 4.440 -999.990 -999.990 1.305 ..P WKT 2010 05 03 02 44 55 31.3200 -97.3300 251.000 122.0 132.387 3.800 -999.990 -999.990 1.324 ..P WKT 2010 05 03 02 49 55 31.3200 -97.3300 251.000 457.0 130.883 3.780 -999.990 -999.990 1.309 ..P WKT 2010 05 03 02 54 55 31.3200 -97.3300 251.000 30.0 135.288 4.610 -999.990 -999.990 1.353 ..P WKT 2010 05 03 02 59 55 31.3200 -97.3300 251.000 122.0 130.690 4.590 -999.990 -999.990 1.307 ..P WKT 2010 05 03 03 04 55 31.3200 -97.3300 251.000 457.0 129.750 4.660 -999.990 -999.990 1.298 ..P WKT 2010 05 03 03 14 55 31.3200 -97.3300 251.000 30.0 130.923 4.950 -999.990 -999.990 1.309 ..P WKT 2010 05 03 03 19 55 31.3200 -97.3300 251.000 122.0 134.440 4.470 -999.990 -999.990 1.344 ..P WKT 2010 05 03 03 24 55 31.3200 -97.3300 251.000 457.0 133.742 4.150 -999.990 -999.990 1.337 ..P WKT 2010 05 03 03 29 55 31.3200 -97.3300 251.000 30.0 134.729 4.710 -999.990 -999.990 1.347 ..P WKT 2010 05 03 03 34 55 31.3200 -97.3300 251.000 122.0 140.770 3.990 -999.990 -999.990 1.408 ..P WKT 2010 05 03 03 39 55 31.3200 -97.3300 251.000 457.0 135.016 3.450 -999.990 -999.990 1.350 ..P WKT 2010 05 03 03 49 55 31.3200 -97.3300 251.000 30.0 141.076 3.680 -999.990 -999.990 1.411 ..P WKT 2010 05 03 03 54 55 31.3200 -97.3300 251.000 122.0 138.854 4.130 -999.990 -999.990 1.389 ..P WKT 2010 05 03 03 59 55 31.3200 -97.3300 251.000 457.0 131.723 3.700 -999.990 -999.990 1.317 ..P WKT 2010 05 03 04 04 55 31.3200 -97.3300 251.000 30.0 163.579 3.700 -999.990 -999.990 1.636 ..P WKT 2010 05 03 04 09 55 31.3200 -97.3300 251.000 122.0 159.390 4.830 -999.990 -999.990 1.594 ..P WKT 2010 05 03 04 14 55 31.3200 -97.3300 251.000 457.0 136.140 4.400 -999.990 -999.990 1.361 ..P WKT 2010 05 03 04 24 55 31.3200 -97.3300 251.000 30.0 146.514 3.960 -999.990 -999.990 1.465 ..P WKT 2010 05 03 04 29 55 31.3200 -97.3300 251.000 122.0 143.693 3.550 -999.990 -999.990 1.437 ..P WKT 2010 05 03 04 34 55 31.3200 -97.3300 251.000 457.0 131.632 4.100 -999.990 -999.990 1.316 ..P WKT 2010 05 03 04 39 55 31.3200 -97.3300 251.000 30.0 163.117 4.960 -999.990 -999.990 1.631 ..P WKT 2010 05 03 04 44 55 31.3200 -97.3300 251.000 122.0 146.437 4.280 -999.990 -999.990 1.464 ..P WKT 2010 05 03 04 49 55 31.3200 -97.3300 251.000 457.0 126.406 3.260 -999.990 -999.990 1.264 ..P WKT 2010 05 03 05 04 55 31.3200 -97.3300 251.000 30.0 137.514 3.930 -999.990 -999.990 1.375 ..P WKT 2010 05 03 05 09 55 31.3200 -97.3300 251.000 122.0 134.684 4.560 -999.990 -999.990 1.347 ..P WKT 2010 05 03 05 14 55 31.3200 -97.3300 251.000 457.0 130.316 3.900 -999.990 -999.990 1.303 ..P WKT 2010 05 03 05 19 55 31.3200 -97.3300 251.000 30.0 156.276 3.290 -999.990 -999.990 1.563 ..P WKT 2010 05 03 05 24 55 31.3200 -97.3300 251.000 122.0 135.979 3.470 -999.990 -999.990 1.360 ..P WKT 2010 05 03 05 29 55 31.3200 -97.3300 251.000 457.0 131.893 3.550 -999.990 -999.990 1.319 ..P WKT 2010 05 03 05 39 55 31.3200 -97.3300 251.000 30.0 145.885 3.270 -999.990 -999.990 1.459 ..P WKT 2010 05 03 05 44 55 31.3200 -97.3300 251.000 122.0 138.687 3.090 -999.990 -999.990 1.387 ..P WKT 2010 05 03 05 49 55 31.3200 -97.3300 251.000 457.0 130.795 3.160 -999.990 -999.990 1.308 ..P WKT 2010 05 03 05 54 55 31.3200 -97.3300 251.000 30.0 147.741 3.460 -999.990 -999.990 1.477 ..P WKT 2010 05 03 05 59 55 31.3200 -97.3300 251.000 122.0 144.593 3.190 -999.990 -999.990 1.446 ..P WKT 2010 05 03 06 04 55 31.3200 -97.3300 251.000 457.0 132.103 3.320 -999.990 -999.990 1.321 ..P WKT 2010 05 03 06 14 55 31.3200 -97.3300 251.000 30.0 158.994 2.920 -999.990 -999.990 1.590 ..P WKT 2010 05 03 06 19 55 31.3200 -97.3300 251.000 122.0 138.983 3.670 -999.990 -999.990 1.390 ..P WKT 2010 05 03 06 24 55 31.3200 -97.3300 251.000 457.0 133.193 3.160 -999.990 -999.990 1.332 ..P WKT 2010 05 03 06 29 55 31.3200 -97.3300 251.000 30.0 157.773 3.280 -999.990 -999.990 1.578 ..P WKT 2010 05 03 06 34 55 31.3200 -97.3300 251.000 122.0 138.612 3.720 -999.990 -999.990 1.386 ..P WKT 2010 05 03 06 39 55 31.3200 -97.3300 251.000 457.0 135.611 3.130 -999.990 -999.990 1.356 ..P WKT 2010 05 03 06 49 55 31.3200 -97.3300 251.000 30.0 154.186 3.230 -999.990 -999.990 1.542 ..P WKT 2010 05 03 06 54 55 31.3200 -97.3300 251.000 122.0 131.228 3.320 -999.990 -999.990 1.312 ..P WKT 2010 05 03 06 59 55 31.3200 -97.3300 251.000 457.0 132.484 3.140 -999.990 -999.990 1.325 ..P WKT 2010 05 03 07 04 55 31.3200 -97.3300 251.000 30.0 157.382 3.260 -999.990 -999.990 1.574 ..P WKT 2010 05 03 07 09 55 31.3200 -97.3300 251.000 122.0 140.000 3.100 -999.990 -999.990 1.400 ..P WKT 2010 05 03 07 14 55 31.3200 -97.3300 251.000 457.0 130.411 5.000 -999.990 -999.990 1.304 ..P WKT 2010 05 03 07 24 55 31.3200 -97.3300 251.000 30.0 158.645 3.490 -999.990 -999.990 1.586 ..P WKT 2010 05 03 07 29 55 31.3200 -97.3300 251.000 122.0 143.104 2.700 -999.990 -999.990 1.431 ..P WKT 2010 05 03 07 34 55 31.3200 -97.3300 251.000 457.0 134.237 2.850 -999.990 -999.990 1.342 ..P WKT 2010 05 03 07 39 55 31.3200 -97.3300 251.000 30.0 154.810 3.150 -999.990 -999.990 1.548 ..P WKT 2010 05 03 07 44 55 31.3200 -97.3300 251.000 122.0 146.222 3.900 -999.990 -999.990 1.462 ..P WKT 2010 05 03 07 49 55 31.3200 -97.3300 251.000 457.0 128.200 4.480 -999.990 -999.990 1.282 ..P WKT 2010 05 03 07 59 55 31.3200 -97.3300 251.000 30.0 160.789 3.310 -999.990 -999.990 1.608 ..P WKT 2010 05 03 08 04 55 31.3200 -97.3300 251.000 122.0 137.586 3.500 -999.990 -999.990 1.376 ..P WKT 2010 05 03 08 09 55 31.3200 -97.3300 251.000 457.0 133.667 3.580 -999.990 -999.990 1.337 ..P WKT 2010 05 03 08 14 55 31.3200 -97.3300 251.000 30.0 165.099 3.130 -999.990 -999.990 1.651 ..P WKT 2010 05 03 08 19 55 31.3200 -97.3300 251.000 122.0 131.932 4.700 -999.990 -999.990 1.319 ..P WKT 2010 05 03 08 24 55 31.3200 -97.3300 251.000 457.0 130.234 3.980 -999.990 -999.990 1.302 ..P WKT 2010 05 03 08 34 55 31.3200 -97.3300 251.000 30.0 156.280 3.920 -999.990 -999.990 1.563 ..P WKT 2010 05 03 08 39 55 31.3200 -97.3300 251.000 122.0 140.256 3.110 -999.990 -999.990 1.403 ..P WKT 2010 05 03 08 44 55 31.3200 -97.3300 251.000 457.0 126.177 4.570 -999.990 -999.990 1.262 ..P WKT 2010 05 03 08 49 55 31.3200 -97.3300 251.000 30.0 160.408 3.090 -999.990 -999.990 1.604 ..P WKT 2010 05 03 08 54 55 31.3200 -97.3300 251.000 122.0 133.739 3.250 -999.990 -999.990 1.337 ..P WKT 2010 05 03 08 59 55 31.3200 -97.3300 251.000 457.0 130.877 3.140 -999.990 -999.990 1.309 ..P WKT 2010 05 03 09 09 55 31.3200 -97.3300 251.000 30.0 163.756 3.400 -999.990 -999.990 1.638 ..P WKT 2010 05 03 09 14 55 31.3200 -97.3300 251.000 122.0 140.586 2.780 -999.990 -999.990 1.406 ..P WKT 2010 05 03 09 19 55 31.3200 -97.3300 251.000 457.0 128.623 2.320 -999.990 -999.990 1.286 ..P WKT 2010 05 03 09 24 55 31.3200 -97.3300 251.000 30.0 165.996 3.330 -999.990 -999.990 1.660 ..P WKT 2010 05 03 09 29 55 31.3200 -97.3300 251.000 122.0 136.211 3.850 -999.990 -999.990 1.362 ..P WKT 2010 05 03 09 34 55 31.3200 -97.3300 251.000 457.0 127.158 2.780 -999.990 -999.990 1.272 ..P WKT 2010 05 03 09 44 55 31.3200 -97.3300 251.000 30.0 160.084 4.460 -999.990 -999.990 1.601 ..P WKT 2010 05 03 09 49 55 31.3200 -97.3300 251.000 122.0 139.378 3.070 -999.990 -999.990 1.394 ..P WKT 2010 05 03 09 54 55 31.3200 -97.3300 251.000 457.0 132.757 4.070 -999.990 -999.990 1.328 ..P WKT 2010 05 03 09 59 55 31.3200 -97.3300 251.000 30.0 157.593 4.050 -999.990 -999.990 1.576 ..P WKT 2010 05 03 10 04 55 31.3200 -97.3300 251.000 122.0 137.178 4.420 -999.990 -999.990 1.372 ..P WKT 2010 05 03 10 09 55 31.3200 -97.3300 251.000 457.0 130.286 4.800 -999.990 -999.990 1.303 ..P WKT 2010 05 03 10 19 55 31.3200 -97.3300 251.000 30.0 174.224 5.190 -999.990 -999.990 1.742 ..P WKT 2010 05 03 10 24 55 31.3200 -97.3300 251.000 122.0 141.244 4.810 -999.990 -999.990 1.412 ..P WKT 2010 05 03 10 29 55 31.3200 -97.3300 251.000 457.0 133.078 5.030 -999.990 -999.990 1.331 ..P WKT 2010 05 03 10 34 55 31.3200 -97.3300 251.000 30.0 161.279 4.630 -999.990 -999.990 1.613 ..P WKT 2010 05 03 10 39 55 31.3200 -97.3300 251.000 122.0 136.036 4.420 -999.990 -999.990 1.360 ..P WKT 2010 05 03 10 44 55 31.3200 -97.3300 251.000 457.0 133.659 4.170 -999.990 -999.990 1.337 ..P WKT 2010 05 03 10 54 55 31.3200 -97.3300 251.000 30.0 185.527 4.210 -999.990 -999.990 1.855 ..P WKT 2010 05 03 10 59 55 31.3200 -97.3300 251.000 122.0 147.016 2.890 -999.990 -999.990 1.470 ..P WKT 2010 05 03 11 04 55 31.3200 -97.3300 251.000 457.0 136.582 3.520 -999.990 -999.990 1.366 ..P WKT 2010 05 03 11 09 55 31.3200 -97.3300 251.000 30.0 189.687 2.820 -999.990 -999.990 1.897 ..P WKT 2010 05 03 11 14 55 31.3200 -97.3300 251.000 122.0 150.101 2.450 -999.990 -999.990 1.501 ..P WKT 2010 05 03 11 19 55 31.3200 -97.3300 251.000 457.0 127.578 2.450 -999.990 -999.990 1.276 ..P WKT 2010 05 03 11 29 55 31.3200 -97.3300 251.000 30.0 233.209 3.030 -999.990 -999.990 2.332 ..P WKT 2010 05 03 11 34 55 31.3200 -97.3300 251.000 122.0 152.504 2.400 -999.990 -999.990 1.525 ..P WKT 2010 05 03 11 39 55 31.3200 -97.3300 251.000 457.0 131.987 2.480 -999.990 -999.990 1.320 ..P WKT 2010 05 03 11 44 55 31.3200 -97.3300 251.000 30.0 164.202 3.650 -999.990 -999.990 1.642 ..P WKT 2010 05 03 11 49 55 31.3200 -97.3300 251.000 122.0 149.182 2.990 -999.990 -999.990 1.492 ..P WKT 2010 05 03 12 09 55 31.3200 -97.3300 251.000 457.0 142.548 3.090 -999.990 -999.990 1.425 ..P WKT 2010 05 03 12 10 25 31.3200 -97.3300 251.000 457.0 145.696 3.860 -999.990 -999.990 1.457 ..P WKT 2010 05 03 12 10 55 31.3200 -97.3300 251.000 457.0 146.234 3.410 -999.990 -999.990 1.462 ..P WKT 2010 05 03 12 11 25 31.3200 -97.3300 251.000 457.0 141.692 3.890 -999.990 -999.990 1.417 ..P WKT 2010 05 03 12 11 55 31.3200 -97.3300 251.000 457.0 139.621 3.040 -999.990 -999.990 1.396 ..P WKT 2010 05 03 12 12 25 31.3200 -97.3300 251.000 457.0 144.555 4.740 -999.990 -999.990 1.446 ..P WKT 2010 05 03 12 12 55 31.3200 -97.3300 251.000 457.0 143.445 3.390 -999.990 -999.990 1.434 ..P WKT 2010 05 03 12 13 25 31.3200 -97.3300 251.000 457.0 145.495 3.370 -999.990 -999.990 1.455 ..P WKT 2010 05 03 12 13 55 31.3200 -97.3300 251.000 457.0 143.974 3.430 -999.990 -999.990 1.440 ..P WKT 2010 05 03 12 14 25 31.3200 -97.3300 251.000 457.0 143.551 3.250 -999.990 -999.990 1.436 ..P WKT 2010 05 03 12 14 55 31.3200 -97.3300 251.000 457.0 145.738 3.520 -999.990 -999.990 1.457 ..P WKT 2010 05 03 12 19 55 31.3200 -97.3300 251.000 30.0 164.602 3.380 -999.990 -999.990 1.646 ..P WKT 2010 05 03 12 24 55 31.3200 -97.3300 251.000 122.0 152.542 3.630 -999.990 -999.990 1.525 ..P WKT 2010 05 03 12 29 55 31.3200 -97.3300 251.000 457.0 135.791 3.000 -999.990 -999.990 1.358 ..P WKT 2010 05 03 12 34 55 31.3200 -97.3300 251.000 30.0 182.768 3.050 -999.990 -999.990 1.828 ..P WKT 2010 05 03 12 39 55 31.3200 -97.3300 251.000 122.0 149.345 3.190 -999.990 -999.990 1.493 ..P WKT 2010 05 03 12 44 55 31.3200 -97.3300 251.000 457.0 142.488 2.870 -999.990 -999.990 1.425 ..P WKT 2010 05 03 12 54 55 31.3200 -97.3300 251.000 30.0 191.396 4.550 -999.990 -999.990 1.914 ..P WKT 2010 05 03 12 59 55 31.3200 -97.3300 251.000 122.0 146.312 3.610 -999.990 -999.990 1.463 ..P WKT 2010 05 03 13 04 55 31.3200 -97.3300 251.000 457.0 142.757 3.950 -999.990 -999.990 1.428 ..P WKT 2010 05 03 13 09 55 31.3200 -97.3300 251.000 30.0 215.614 4.310 -999.990 -999.990 2.156 ..P WKT 2010 05 03 13 14 55 31.3200 -97.3300 251.000 122.0 148.630 4.670 -999.990 -999.990 1.486 ..P WKT 2010 05 03 13 19 55 31.3200 -97.3300 251.000 457.0 136.356 4.590 -999.990 -999.990 1.364 ..P WKT 2010 05 03 13 29 55 31.3200 -97.3300 251.000 30.0 202.734 6.460 -999.990 -999.990 2.027 ..P WKT 2010 05 03 13 34 55 31.3200 -97.3300 251.000 122.0 158.056 5.930 -999.990 -999.990 1.581 ..P WKT 2010 05 03 13 39 55 31.3200 -97.3300 251.000 457.0 147.149 6.320 -999.990 -999.990 1.471 ..P WKT 2010 05 03 13 44 55 31.3200 -97.3300 251.000 30.0 192.934 6.590 -999.990 -999.990 1.929 ..P WKT 2010 05 03 13 49 55 31.3200 -97.3300 251.000 122.0 150.273 7.070 -999.990 -999.990 1.503 ..P WKT 2010 05 03 13 54 55 31.3200 -97.3300 251.000 457.0 151.559 7.190 -999.990 -999.990 1.516 ..P WKT 2010 05 03 14 04 55 31.3200 -97.3300 251.000 30.0 185.914 7.220 -999.990 -999.990 1.859 ..P WKT 2010 05 03 14 09 55 31.3200 -97.3300 251.000 122.0 161.774 7.160 -999.990 -999.990 1.618 ..P WKT 2010 05 03 14 14 55 31.3200 -97.3300 251.000 457.0 151.790 7.360 -999.990 -999.990 1.518 ..P WKT 2010 05 03 14 19 55 31.3200 -97.3300 251.000 30.0 176.276 7.750 -999.990 -999.990 1.763 ..P WKT 2010 05 03 14 24 55 31.3200 -97.3300 251.000 122.0 169.906 7.730 -999.990 -999.990 1.699 ..P WKT 2010 05 03 14 29 55 31.3200 -97.3300 251.000 457.0 154.069 7.800 -999.990 -999.990 1.541 ..P WKT 2010 05 03 14 39 55 31.3200 -97.3300 251.000 30.0 169.143 8.310 -999.990 -999.990 1.691 ..P WKT 2010 05 03 14 44 55 31.3200 -97.3300 251.000 122.0 165.267 8.500 -999.990 -999.990 1.653 ..P WKT 2010 05 03 14 49 55 31.3200 -97.3300 251.000 457.0 164.453 9.100 -999.990 -999.990 1.645 ..P WKT 2010 05 03 14 54 55 31.3200 -97.3300 251.000 30.0 156.671 9.260 -999.990 -999.990 1.567 ..P WKT 2010 05 03 14 59 55 31.3200 -97.3300 251.000 122.0 166.727 9.470 -999.990 -999.990 1.667 ..P WKT 2010 05 03 15 04 55 31.3200 -97.3300 251.000 457.0 158.941 9.800 -999.990 -999.990 1.589 ..P WKT 2010 05 03 15 14 55 31.3200 -97.3300 251.000 30.0 167.791 10.100 -999.990 -999.990 1.678 ..P WKT 2010 05 03 15 19 55 31.3200 -97.3300 251.000 122.0 164.064 10.620 -999.990 -999.990 1.641 ..P WKT 2010 05 03 15 24 55 31.3200 -97.3300 251.000 457.0 170.108 10.850 -999.990 -999.990 1.701 ..P WKT 2010 05 03 15 29 55 31.3200 -97.3300 251.000 30.0 170.569 11.080 -999.990 -999.990 1.706 ..P WKT 2010 05 03 15 34 55 31.3200 -97.3300 251.000 122.0 165.723 11.090 -999.990 -999.990 1.657 ..P WKT 2010 05 03 15 39 55 31.3200 -97.3300 251.000 457.0 167.860 11.300 -999.990 -999.990 1.679 ..P WKT 2010 05 03 15 49 55 31.3200 -97.3300 251.000 30.0 170.998 11.850 -999.990 -999.990 1.710 ..P WKT 2010 05 03 15 54 55 31.3200 -97.3300 251.000 122.0 171.998 12.300 -999.990 -999.990 1.720 ..P WKT 2010 05 03 15 59 55 31.3200 -97.3300 251.000 457.0 164.049 12.770 -999.990 -999.990 1.640 ..P WKT 2010 05 03 16 04 55 31.3200 -97.3300 251.000 30.0 174.000 12.940 -999.990 -999.990 1.740 ..P WKT 2010 05 03 16 09 55 31.3200 -97.3300 251.000 122.0 179.058 13.020 -999.990 -999.990 1.791 ..P WKT 2010 05 03 16 14 55 31.3200 -97.3300 251.000 457.0 167.327 13.330 -999.990 -999.990 1.673 ..P WKT 2010 05 03 16 24 55 31.3200 -97.3300 251.000 30.0 173.385 13.920 -999.990 -999.990 1.734 ..P WKT 2010 05 03 16 29 55 31.3200 -97.3300 251.000 122.0 177.745 14.280 -999.990 -999.990 1.777 ..P WKT 2010 05 03 16 34 55 31.3200 -97.3300 251.000 457.0 174.127 14.290 -999.990 -999.990 1.741 ..P WKT 2010 05 03 16 39 55 31.3200 -97.3300 251.000 30.0 172.607 14.550 -999.990 -999.990 1.726 ..P WKT 2010 05 03 16 44 55 31.3200 -97.3300 251.000 122.0 170.666 14.870 -999.990 -999.990 1.707 ..P WKT 2010 05 03 16 49 55 31.3200 -97.3300 251.000 457.0 174.607 15.120 -999.990 -999.990 1.746 ..P WKT 2010 05 03 17 04 55 31.3200 -97.3300 251.000 30.0 181.271 15.820 -999.990 -999.990 1.813 ..P WKT 2010 05 03 17 09 55 31.3200 -97.3300 251.000 122.0 173.243 16.010 -999.990 -999.990 1.732 ..P WKT 2010 05 03 17 14 55 31.3200 -97.3300 251.000 457.0 177.546 16.450 -999.990 -999.990 1.775 ..P WKT 2010 05 03 17 19 55 31.3200 -97.3300 251.000 30.0 172.320 16.610 -999.990 -999.990 1.723 ..P WKT 2010 05 03 17 24 55 31.3200 -97.3300 251.000 122.0 180.406 17.010 -999.990 -999.990 1.804 ..P WKT 2010 05 03 17 29 55 31.3200 -97.3300 251.000 457.0 180.365 17.370 -999.990 -999.990 1.804 ..P WKT 2010 05 03 17 39 55 31.3200 -97.3300 251.000 30.0 177.537 17.550 -999.990 -999.990 1.775 ..P WKT 2010 05 03 17 44 55 31.3200 -97.3300 251.000 122.0 179.937 17.800 -999.990 -999.990 1.799 ..P WKT 2010 05 03 17 49 55 31.3200 -97.3300 251.000 457.0 175.049 18.060 -999.990 -999.990 1.750 ..P WKT 2010 05 03 17 54 55 31.3200 -97.3300 251.000 30.0 177.729 18.250 -999.990 -999.990 1.777 ..P WKT 2010 05 03 17 59 55 31.3200 -97.3300 251.000 122.0 176.204 18.510 -999.990 -999.990 1.762 ..P WKT 2010 05 03 18 04 55 31.3200 -97.3300 251.000 457.0 176.360 18.800 -999.990 -999.990 1.764 ..P WKT 2010 05 03 18 14 55 31.3200 -97.3300 251.000 30.0 176.572 19.220 -999.990 -999.990 1.766 ..P WKT 2010 05 03 18 19 55 31.3200 -97.3300 251.000 122.0 179.711 19.670 -999.990 -999.990 1.797 ..P WKT 2010 05 03 18 24 55 31.3200 -97.3300 251.000 457.0 175.282 19.730 -999.990 -999.990 1.753 ..P WKT 2010 05 03 18 29 55 31.3200 -97.3300 251.000 30.0 184.586 20.050 -999.990 -999.990 1.846 ..P WKT 2010 05 03 18 34 55 31.3200 -97.3300 251.000 122.0 182.118 20.470 -999.990 -999.990 1.821 ..P WKT 2010 05 03 18 39 55 31.3200 -97.3300 251.000 457.0 185.815 20.590 -999.990 -999.990 1.858 ..P WKT 2010 05 03 18 49 55 31.3200 -97.3300 251.000 30.0 176.476 21.050 -999.990 -999.990 1.765 ..P WKT 2010 05 03 18 54 55 31.3200 -97.3300 251.000 122.0 185.853 21.250 -999.990 -999.990 1.859 ..P WKT 2010 05 03 18 59 55 31.3200 -97.3300 251.000 457.0 187.106 21.490 -999.990 -999.990 1.871 ..P WKT 2010 05 03 19 04 55 31.3200 -97.3300 251.000 30.0 194.799 22.310 -999.990 -999.990 1.948 ..P WKT 2010 05 03 19 09 55 31.3200 -97.3300 251.000 122.0 188.770 22.100 -999.990 -999.990 1.888 ..P WKT 2010 05 03 19 14 55 31.3200 -97.3300 251.000 457.0 184.142 22.310 -999.990 -999.990 1.841 ..P WKT 2010 05 03 19 24 55 31.3200 -97.3300 251.000 30.0 188.281 22.790 -999.990 -999.990 1.883 ..P WKT 2010 05 03 19 29 55 31.3200 -97.3300 251.000 122.0 191.449 23.120 -999.990 -999.990 1.914 ..P WKT 2010 05 03 19 34 55 31.3200 -97.3300 251.000 457.0 180.908 23.260 -999.990 -999.990 1.809 ..P WKT 2010 05 03 19 39 55 31.3200 -97.3300 251.000 30.0 191.347 23.570 -999.990 -999.990 1.913 ..P WKT 2010 05 03 19 44 55 31.3200 -97.3300 251.000 122.0 194.231 24.340 -999.990 -999.990 1.942 ..P WKT 2010 05 03 19 49 55 31.3200 -97.3300 251.000 457.0 186.909 24.210 -999.990 -999.990 1.869 ..P WKT 2010 05 03 19 59 55 31.3200 -97.3300 251.000 30.0 189.460 24.660 -999.990 -999.990 1.895 ..P WKT 2010 05 03 20 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 20 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 20 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 20 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 20 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 20 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 20 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 20 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 20 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 20 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 20 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 21 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 21 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 21 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 21 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 21 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 21 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 21 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 21 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 21 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 21 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 22 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 22 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 22 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 22 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 03 22 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 03 22 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 03 22 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 03 22 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 03 22 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 03 22 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 03 23 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 03 23 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 03 23 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 03 23 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 03 23 31 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 23 32 25 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 23 32 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 23 33 25 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 23 33 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 23 34 25 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 23 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 23 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 23 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 03 23 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 04 00 09 55 31.3200 -97.3300 251.000 457.0 230.016 49.840 -999.990 -999.990 2.300 ..P WKT 2010 05 04 00 10 25 31.3200 -97.3300 251.000 457.0 233.736 52.180 -999.990 -999.990 2.337 ..P WKT 2010 05 04 00 10 55 31.3200 -97.3300 251.000 457.0 237.182 54.410 -999.990 -999.990 2.372 ..P WKT 2010 05 04 00 11 25 31.3200 -97.3300 251.000 457.0 237.332 56.730 -999.990 -999.990 2.373 ..P WKT 2010 05 04 00 11 55 31.3200 -97.3300 251.000 457.0 242.975 59.100 -999.990 -999.990 2.430 ..P WKT 2010 05 04 00 12 25 31.3200 -97.3300 251.000 457.0 242.576 61.300 -999.990 -999.990 2.426 ..P WKT 2010 05 04 00 12 55 31.3200 -97.3300 251.000 457.0 240.116 63.600 -999.990 -999.990 2.401 ..P WKT 2010 05 04 00 13 25 31.3200 -97.3300 251.000 457.0 249.059 65.680 -999.990 -999.990 2.491 ..P WKT 2010 05 04 00 13 55 31.3200 -97.3300 251.000 457.0 250.446 67.780 -999.990 -999.990 2.504 ..P WKT 2010 05 04 00 14 25 31.3200 -97.3300 251.000 457.0 252.659 69.940 -999.990 -999.990 2.527 ..P WKT 2010 05 04 00 14 55 31.3200 -97.3300 251.000 457.0 261.192 71.900 -999.990 -999.990 2.612 ..P WKT 2010 05 04 00 19 55 31.3200 -97.3300 251.000 30.0 287.188 88.210 -999.990 -999.990 2.872 ..P WKT 2010 05 04 00 24 55 31.3200 -97.3300 251.000 122.0 296.432 96.530 -999.990 -999.990 2.964 ..P WKT 2010 05 04 00 29 55 31.3200 -97.3300 251.000 457.0 296.736 87.990 -999.990 -999.990 2.967 ..P WKT 2010 05 04 00 34 55 31.3200 -97.3300 251.000 30.0 284.083 80.440 -999.990 -999.990 2.841 ..P WKT 2010 05 04 00 39 55 31.3200 -97.3300 251.000 122.0 262.995 65.810 -999.990 -999.990 2.630 ..P WKT 2010 05 04 00 44 55 31.3200 -97.3300 251.000 457.0 234.975 46.130 -999.990 -999.990 2.350 ..P WKT 2010 05 04 00 54 55 31.3200 -97.3300 251.000 30.0 189.693 51.710 -999.990 -999.990 1.897 ..P WKT 2010 05 04 00 59 55 31.3200 -97.3300 251.000 122.0 187.525 74.570 -999.990 -999.990 1.875 ..P WKT 2010 05 04 01 04 55 31.3200 -97.3300 251.000 457.0 177.048 86.800 -999.990 -999.990 1.770 ..P WKT 2010 05 04 01 09 55 31.3200 -97.3300 251.000 30.0 181.654 68.350 -999.990 -999.990 1.817 ..P WKT 2010 05 04 01 14 55 31.3200 -97.3300 251.000 122.0 189.592 41.340 -999.990 -999.990 1.896 ..P WKT 2010 05 04 01 19 55 31.3200 -97.3300 251.000 457.0 169.803 31.930 -999.990 -999.990 1.698 ..P WKT 2010 05 04 01 29 55 31.3200 -97.3300 251.000 30.0 190.852 31.520 -999.990 -999.990 1.909 ..P WKT 2010 05 04 01 34 55 31.3200 -97.3300 251.000 122.0 187.579 33.000 -999.990 -999.990 1.876 ..P WKT 2010 05 04 01 39 55 31.3200 -97.3300 251.000 457.0 174.849 33.430 -999.990 -999.990 1.748 ..P WKT 2010 05 04 01 44 55 31.3200 -97.3300 251.000 30.0 183.805 31.860 -999.990 -999.990 1.838 ..P WKT 2010 05 04 01 49 55 31.3200 -97.3300 251.000 122.0 190.544 30.330 -999.990 -999.990 1.905 ..P WKT 2010 05 04 01 54 55 31.3200 -97.3300 251.000 457.0 169.712 29.750 -999.990 -999.990 1.697 ..P WKT 2010 05 04 02 04 55 31.3200 -97.3300 251.000 30.0 194.909 29.350 -999.990 -999.990 1.949 ..P WKT 2010 05 04 02 09 55 31.3200 -97.3300 251.000 122.0 171.811 29.380 -999.990 -999.990 1.718 ..P WKT 2010 05 04 02 14 55 31.3200 -97.3300 251.000 457.0 170.744 29.280 -999.990 -999.990 1.707 ..P WKT 2010 05 04 02 19 55 31.3200 -97.3300 251.000 30.0 194.536 28.860 -999.990 -999.990 1.945 ..P WKT 2010 05 04 02 24 55 31.3200 -97.3300 251.000 122.0 176.989 28.600 -999.990 -999.990 1.770 ..P WKT 2010 05 04 02 29 55 31.3200 -97.3300 251.000 457.0 181.235 28.160 -999.990 -999.990 1.812 ..P WKT 2010 05 04 02 39 55 31.3200 -97.3300 251.000 30.0 197.895 28.020 -999.990 -999.990 1.979 ..P WKT 2010 05 04 02 44 55 31.3200 -97.3300 251.000 122.0 180.354 27.590 -999.990 -999.990 1.804 ..P WKT 2010 05 04 02 49 55 31.3200 -97.3300 251.000 457.0 178.484 27.370 -999.990 -999.990 1.785 ..P WKT 2010 05 04 02 54 55 31.3200 -97.3300 251.000 30.0 192.871 27.070 -999.990 -999.990 1.929 ..P WKT 2010 05 04 02 59 55 31.3200 -97.3300 251.000 122.0 170.813 26.790 -999.990 -999.990 1.708 ..P WKT 2010 05 04 03 04 55 31.3200 -97.3300 251.000 457.0 173.425 26.590 -999.990 -999.990 1.734 ..P WKT 2010 05 04 03 14 55 31.3200 -97.3300 251.000 30.0 181.183 26.150 -999.990 -999.990 1.812 ..P WKT 2010 05 04 03 19 55 31.3200 -97.3300 251.000 122.0 169.334 25.980 -999.990 -999.990 1.693 ..P WKT 2010 05 04 03 24 55 31.3200 -97.3300 251.000 457.0 172.511 25.840 -999.990 -999.990 1.725 ..P WKT 2010 05 04 03 29 55 31.3200 -97.3300 251.000 30.0 182.156 25.490 -999.990 -999.990 1.822 ..P WKT 2010 05 04 03 34 55 31.3200 -97.3300 251.000 122.0 170.012 25.350 -999.990 -999.990 1.700 ..P WKT 2010 05 04 03 39 55 31.3200 -97.3300 251.000 457.0 170.238 25.010 -999.990 -999.990 1.702 ..P WKT 2010 05 04 03 49 55 31.3200 -97.3300 251.000 30.0 166.647 24.840 -999.990 -999.990 1.666 ..P WKT 2010 05 04 03 54 55 31.3200 -97.3300 251.000 122.0 175.080 24.250 -999.990 -999.990 1.751 ..P WKT 2010 05 04 03 59 55 31.3200 -97.3300 251.000 457.0 169.149 23.980 -999.990 -999.990 1.691 ..P WKT 2010 05 04 04 04 55 31.3200 -97.3300 251.000 30.0 175.051 23.880 -999.990 -999.990 1.751 ..P WKT 2010 05 04 04 09 55 31.3200 -97.3300 251.000 122.0 171.794 23.510 -999.990 -999.990 1.718 ..P WKT 2010 05 04 04 14 55 31.3200 -97.3300 251.000 457.0 175.022 23.170 -999.990 -999.990 1.750 ..P WKT 2010 05 04 04 24 55 31.3200 -97.3300 251.000 30.0 186.056 22.980 -999.990 -999.990 1.861 ..P WKT 2010 05 04 04 29 55 31.3200 -97.3300 251.000 122.0 171.002 22.770 -999.990 -999.990 1.710 ..P WKT 2010 05 04 04 34 55 31.3200 -97.3300 251.000 457.0 174.434 22.230 -999.990 -999.990 1.744 ..P WKT 2010 05 04 04 39 55 31.3200 -97.3300 251.000 30.0 178.572 22.040 -999.990 -999.990 1.786 ..P WKT 2010 05 04 04 44 55 31.3200 -97.3300 251.000 122.0 168.165 21.820 -999.990 -999.990 1.682 ..P WKT 2010 05 04 04 49 55 31.3200 -97.3300 251.000 457.0 169.620 21.590 -999.990 -999.990 1.696 ..P WKT 2010 05 04 05 04 55 31.3200 -97.3300 251.000 30.0 164.837 20.820 -999.990 -999.990 1.648 ..P WKT 2010 05 04 05 09 55 31.3200 -97.3300 251.000 122.0 166.383 20.690 -999.990 -999.990 1.664 ..P WKT 2010 05 04 05 14 55 31.3200 -97.3300 251.000 457.0 163.402 20.420 -999.990 -999.990 1.634 ..P WKT 2010 05 04 05 19 55 31.3200 -97.3300 251.000 30.0 161.270 20.250 -999.990 -999.990 1.613 ..P WKT 2010 05 04 05 24 55 31.3200 -97.3300 251.000 122.0 167.060 20.110 -999.990 -999.990 1.671 ..P WKT 2010 05 04 05 29 55 31.3200 -97.3300 251.000 457.0 161.531 19.610 -999.990 -999.990 1.615 ..P WKT 2010 05 04 05 39 55 31.3200 -97.3300 251.000 30.0 159.719 19.200 -999.990 -999.990 1.597 ..P WKT 2010 05 04 05 44 55 31.3200 -97.3300 251.000 122.0 162.589 19.110 -999.990 -999.990 1.626 ..P WKT 2010 05 04 05 49 55 31.3200 -97.3300 251.000 457.0 159.796 18.630 -999.990 -999.990 1.598 ..P WKT 2010 05 04 05 54 55 31.3200 -97.3300 251.000 30.0 163.234 18.240 -999.990 -999.990 1.632 ..P WKT 2010 05 04 05 59 55 31.3200 -97.3300 251.000 122.0 158.740 18.580 -999.990 -999.990 1.587 ..P WKT 2010 05 04 06 04 55 31.3200 -97.3300 251.000 457.0 163.878 17.680 -999.990 -999.990 1.639 ..P WKT 2010 05 04 06 14 55 31.3200 -97.3300 251.000 30.0 165.736 17.170 -999.990 -999.990 1.657 ..P WKT 2010 05 04 06 19 55 31.3200 -97.3300 251.000 122.0 160.472 17.020 -999.990 -999.990 1.605 ..P WKT 2010 05 04 06 24 55 31.3200 -97.3300 251.000 457.0 160.024 16.920 -999.990 -999.990 1.600 ..P WKT 2010 05 04 06 29 55 31.3200 -97.3300 251.000 30.0 161.560 16.540 -999.990 -999.990 1.616 ..P WKT 2010 05 04 06 34 55 31.3200 -97.3300 251.000 122.0 167.347 16.270 -999.990 -999.990 1.673 ..P WKT 2010 05 04 06 39 55 31.3200 -97.3300 251.000 457.0 162.081 16.100 -999.990 -999.990 1.621 ..P WKT 2010 05 04 06 49 55 31.3200 -97.3300 251.000 30.0 156.690 15.640 -999.990 -999.990 1.567 ..P WKT 2010 05 04 06 54 55 31.3200 -97.3300 251.000 122.0 155.999 15.300 -999.990 -999.990 1.560 ..P WKT 2010 05 04 06 59 55 31.3200 -97.3300 251.000 457.0 157.291 15.010 -999.990 -999.990 1.573 ..P WKT 2010 05 04 07 04 55 31.3200 -97.3300 251.000 30.0 159.717 14.790 -999.990 -999.990 1.597 ..P WKT 2010 05 04 07 09 55 31.3200 -97.3300 251.000 122.0 159.451 14.400 -999.990 -999.990 1.595 ..P WKT 2010 05 04 07 14 55 31.3200 -97.3300 251.000 457.0 151.248 14.120 -999.990 -999.990 1.512 ..P WKT 2010 05 04 07 24 55 31.3200 -97.3300 251.000 30.0 162.617 13.570 -999.990 -999.990 1.626 ..P WKT 2010 05 04 07 29 55 31.3200 -97.3300 251.000 122.0 156.541 13.330 -999.990 -999.990 1.565 ..P WKT 2010 05 04 07 34 55 31.3200 -97.3300 251.000 457.0 156.417 13.350 -999.990 -999.990 1.564 ..P WKT 2010 05 04 07 39 55 31.3200 -97.3300 251.000 30.0 166.491 12.950 -999.990 -999.990 1.665 ..P WKT 2010 05 04 07 44 55 31.3200 -97.3300 251.000 122.0 160.840 12.590 -999.990 -999.990 1.608 ..P WKT 2010 05 04 07 49 55 31.3200 -97.3300 251.000 457.0 160.006 12.250 -999.990 -999.990 1.600 ..P WKT 2010 05 04 07 59 55 31.3200 -97.3300 251.000 30.0 167.463 11.930 -999.990 -999.990 1.675 ..P WKT 2010 05 04 08 04 55 31.3200 -97.3300 251.000 122.0 160.741 11.680 -999.990 -999.990 1.607 ..P WKT 2010 05 04 08 09 55 31.3200 -97.3300 251.000 457.0 158.836 11.700 -999.990 -999.990 1.588 ..P WKT 2010 05 04 08 14 55 31.3200 -97.3300 251.000 30.0 159.761 11.480 -999.990 -999.990 1.598 ..P WKT 2010 05 04 08 19 55 31.3200 -97.3300 251.000 122.0 158.564 11.540 -999.990 -999.990 1.586 ..P WKT 2010 05 04 08 24 55 31.3200 -97.3300 251.000 457.0 150.715 11.370 -999.990 -999.990 1.507 ..P WKT 2010 05 04 08 34 55 31.3200 -97.3300 251.000 30.0 155.195 10.820 -999.990 -999.990 1.552 ..P WKT 2010 05 04 08 39 55 31.3200 -97.3300 251.000 122.0 158.181 10.380 -999.990 -999.990 1.582 ..P WKT 2010 05 04 08 44 55 31.3200 -97.3300 251.000 457.0 156.640 10.030 -999.990 -999.990 1.566 ..P WKT 2010 05 04 08 49 55 31.3200 -97.3300 251.000 30.0 155.949 9.400 -999.990 -999.990 1.559 ..P WKT 2010 05 04 08 54 55 31.3200 -97.3300 251.000 122.0 157.519 9.000 -999.990 -999.990 1.575 ..P WKT 2010 05 04 08 59 55 31.3200 -97.3300 251.000 457.0 155.698 8.620 -999.990 -999.990 1.557 ..P WKT 2010 05 04 09 09 55 31.3200 -97.3300 251.000 30.0 148.424 8.060 -999.990 -999.990 1.484 ..P WKT 2010 05 04 09 14 55 31.3200 -97.3300 251.000 122.0 159.355 7.920 -999.990 -999.990 1.594 ..P WKT 2010 05 04 09 19 55 31.3200 -97.3300 251.000 457.0 153.056 8.290 -999.990 -999.990 1.531 ..P WKT 2010 05 04 09 24 55 31.3200 -97.3300 251.000 30.0 145.350 8.250 -999.990 -999.990 1.454 ..P WKT 2010 05 04 09 29 55 31.3200 -97.3300 251.000 122.0 150.629 7.650 -999.990 -999.990 1.506 ..P WKT 2010 05 04 09 34 55 31.3200 -97.3300 251.000 457.0 142.927 8.090 -999.990 -999.990 1.429 ..P WKT 2010 05 04 09 44 55 31.3200 -97.3300 251.000 30.0 142.038 6.540 -999.990 -999.990 1.420 ..P WKT 2010 05 04 09 49 55 31.3200 -97.3300 251.000 122.0 142.923 6.360 -999.990 -999.990 1.429 ..P WKT 2010 05 04 09 54 55 31.3200 -97.3300 251.000 457.0 139.580 7.170 -999.990 -999.990 1.396 ..P WKT 2010 05 04 09 59 55 31.3200 -97.3300 251.000 30.0 148.916 6.070 -999.990 -999.990 1.489 ..P WKT 2010 05 04 10 04 55 31.3200 -97.3300 251.000 122.0 150.643 5.730 -999.990 -999.990 1.506 ..P WKT 2010 05 04 10 09 55 31.3200 -97.3300 251.000 457.0 144.487 5.300 -999.990 -999.990 1.445 ..P WKT 2010 05 04 10 19 55 31.3200 -97.3300 251.000 30.0 141.590 4.430 -999.990 -999.990 1.416 ..P WKT 2010 05 04 10 24 55 31.3200 -97.3300 251.000 122.0 153.560 4.040 -999.990 -999.990 1.536 ..P WKT 2010 05 04 10 29 55 31.3200 -97.3300 251.000 457.0 145.564 4.020 -999.990 -999.990 1.456 ..P WKT 2010 05 04 10 34 55 31.3200 -97.3300 251.000 30.0 142.633 3.900 -999.990 -999.990 1.426 ..P WKT 2010 05 04 10 39 55 31.3200 -97.3300 251.000 122.0 155.150 3.800 -999.990 -999.990 1.552 ..P WKT 2010 05 04 10 44 55 31.3200 -97.3300 251.000 457.0 142.952 3.710 -999.990 -999.990 1.430 ..P WKT 2010 05 04 10 54 55 31.3200 -97.3300 251.000 30.0 148.521 3.450 -999.990 -999.990 1.485 ..P WKT 2010 05 04 10 59 55 31.3200 -97.3300 251.000 122.0 153.365 3.500 -999.990 -999.990 1.534 ..P WKT 2010 05 04 11 04 55 31.3200 -97.3300 251.000 457.0 148.114 4.130 -999.990 -999.990 1.481 ..P WKT 2010 05 04 11 09 55 31.3200 -97.3300 251.000 30.0 146.930 3.590 -999.990 -999.990 1.469 ..P WKT 2010 05 04 11 14 55 31.3200 -97.3300 251.000 122.0 152.189 3.860 -999.990 -999.990 1.522 ..P WKT 2010 05 04 11 19 55 31.3200 -97.3300 251.000 457.0 145.826 4.120 -999.990 -999.990 1.458 ..P WKT 2010 05 04 11 29 55 31.3200 -97.3300 251.000 30.0 141.716 3.250 -999.990 -999.990 1.417 ..P WKT 2010 05 04 11 34 55 31.3200 -97.3300 251.000 122.0 149.271 4.340 -999.990 -999.990 1.493 ..P WKT 2010 05 04 11 39 55 31.3200 -97.3300 251.000 457.0 143.548 4.510 -999.990 -999.990 1.435 ..P WKT 2010 05 04 11 44 55 31.3200 -97.3300 251.000 30.0 136.854 3.280 -999.990 -999.990 1.369 ..P WKT 2010 05 04 11 49 55 31.3200 -97.3300 251.000 122.0 139.376 4.730 -999.990 -999.990 1.394 ..P WKT 2010 05 04 12 09 55 31.3200 -97.3300 251.000 457.0 132.507 3.430 -999.990 -999.990 1.325 ..P WKT 2010 05 04 12 10 25 31.3200 -97.3300 251.000 457.0 134.149 3.370 -999.990 -999.990 1.341 ..P WKT 2010 05 04 12 10 55 31.3200 -97.3300 251.000 457.0 133.700 3.960 -999.990 -999.990 1.337 ..P WKT 2010 05 04 12 11 25 31.3200 -97.3300 251.000 457.0 136.874 3.760 -999.990 -999.990 1.369 ..P WKT 2010 05 04 12 11 55 31.3200 -97.3300 251.000 457.0 139.211 3.620 -999.990 -999.990 1.392 ..P WKT 2010 05 04 12 12 25 31.3200 -97.3300 251.000 457.0 136.395 3.360 -999.990 -999.990 1.364 ..P WKT 2010 05 04 12 12 55 31.3200 -97.3300 251.000 457.0 133.579 3.890 -999.990 -999.990 1.336 ..P WKT 2010 05 04 12 13 25 31.3200 -97.3300 251.000 457.0 135.359 4.180 -999.990 -999.990 1.354 ..P WKT 2010 05 04 12 13 55 31.3200 -97.3300 251.000 457.0 133.518 3.990 -999.990 -999.990 1.335 ..P WKT 2010 05 04 12 14 25 31.3200 -97.3300 251.000 457.0 130.144 3.380 -999.990 -999.990 1.301 ..P WKT 2010 05 04 12 14 55 31.3200 -97.3300 251.000 457.0 131.228 3.540 -999.990 -999.990 1.312 ..P WKT 2010 05 04 12 19 55 31.3200 -97.3300 251.000 30.0 142.766 4.110 -999.990 -999.990 1.428 ..P WKT 2010 05 04 12 24 55 31.3200 -97.3300 251.000 122.0 144.970 3.640 -999.990 -999.990 1.450 ..P WKT 2010 05 04 12 29 55 31.3200 -97.3300 251.000 457.0 135.472 4.850 -999.990 -999.990 1.355 ..P WKT 2010 05 04 12 34 55 31.3200 -97.3300 251.000 30.0 138.790 3.770 -999.990 -999.990 1.388 ..P WKT 2010 05 04 12 39 55 31.3200 -97.3300 251.000 122.0 138.208 3.800 -999.990 -999.990 1.382 ..P WKT 2010 05 04 12 44 55 31.3200 -97.3300 251.000 457.0 139.019 4.420 -999.990 -999.990 1.390 ..P WKT 2010 05 04 12 54 55 31.3200 -97.3300 251.000 30.0 142.378 3.720 -999.990 -999.990 1.424 ..P WKT 2010 05 04 12 59 55 31.3200 -97.3300 251.000 122.0 138.240 3.690 -999.990 -999.990 1.382 ..P WKT 2010 05 04 13 04 55 31.3200 -97.3300 251.000 457.0 136.054 3.020 -999.990 -999.990 1.361 ..P WKT 2010 05 04 13 09 55 31.3200 -97.3300 251.000 30.0 139.020 2.830 -999.990 -999.990 1.390 ..P WKT 2010 05 04 13 14 55 31.3200 -97.3300 251.000 122.0 144.772 2.670 -999.990 -999.990 1.448 ..P WKT 2010 05 04 13 19 55 31.3200 -97.3300 251.000 457.0 134.089 3.020 -999.990 -999.990 1.341 ..P WKT 2010 05 04 13 29 55 31.3200 -97.3300 251.000 30.0 147.701 3.300 -999.990 -999.990 1.477 ..P WKT 2010 05 04 13 34 55 31.3200 -97.3300 251.000 122.0 151.104 7.420 -999.990 -999.990 1.511 ..P WKT 2010 05 04 13 39 55 31.3200 -97.3300 251.000 457.0 135.846 14.120 -999.990 -999.990 1.358 ..P WKT 2010 05 04 13 44 55 31.3200 -97.3300 251.000 30.0 151.227 18.590 -999.990 -999.990 1.512 ..P WKT 2010 05 04 13 49 55 31.3200 -97.3300 251.000 122.0 141.539 15.530 -999.990 -999.990 1.415 ..P WKT 2010 05 04 13 54 55 31.3200 -97.3300 251.000 457.0 135.751 9.450 -999.990 -999.990 1.358 ..P WKT 2010 05 04 14 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 04 14 05 25 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 04 14 05 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 04 14 39 55 31.3200 -97.3300 251.000 30.0 171.014 3.760 -999.990 -999.990 1.710 ..P WKT 2010 05 04 14 44 55 31.3200 -97.3300 251.000 122.0 191.445 11.990 -999.990 -999.990 1.914 ..P WKT 2010 05 04 14 49 55 31.3200 -97.3300 251.000 457.0 191.266 26.420 -999.990 -999.990 1.913 ..P WKT 2010 05 04 14 54 55 31.3200 -97.3300 251.000 30.0 188.860 35.210 -999.990 -999.990 1.889 ..P WKT 2010 05 04 14 59 55 31.3200 -97.3300 251.000 122.0 179.771 29.480 -999.990 -999.990 1.798 ..P WKT 2010 05 04 15 04 55 31.3200 -97.3300 251.000 457.0 161.075 17.730 -999.990 -999.990 1.611 ..P WKT 2010 05 04 15 14 55 31.3200 -97.3300 251.000 30.0 138.104 17.770 -999.990 -999.990 1.381 ..P WKT 2010 05 04 15 19 55 31.3200 -97.3300 251.000 122.0 140.373 29.250 -999.990 -999.990 1.404 ..P WKT 2010 05 04 15 24 55 31.3200 -97.3300 251.000 457.0 126.075 35.330 -999.990 -999.990 1.261 ..P WKT 2010 05 04 15 29 55 31.3200 -97.3300 251.000 30.0 136.001 26.500 -999.990 -999.990 1.360 ..P WKT 2010 05 04 15 34 55 31.3200 -97.3300 251.000 122.0 145.509 11.830 -999.990 -999.990 1.455 ..P WKT 2010 05 04 15 39 55 31.3200 -97.3300 251.000 457.0 137.337 6.640 -999.990 -999.990 1.373 ..P WKT 2010 05 04 15 49 55 31.3200 -97.3300 251.000 30.0 148.138 6.830 -999.990 -999.990 1.481 ..P WKT 2010 05 04 15 54 55 31.3200 -97.3300 251.000 122.0 150.407 10.900 -999.990 -999.990 1.504 ..P WKT 2010 05 04 15 59 55 31.3200 -97.3300 251.000 457.0 136.528 13.010 -999.990 -999.990 1.365 ..P WKT 2010 05 04 16 04 55 31.3200 -97.3300 251.000 30.0 144.782 9.990 -999.990 -999.990 1.448 ..P WKT 2010 05 04 16 09 55 31.3200 -97.3300 251.000 122.0 141.065 6.620 -999.990 -999.990 1.411 ..P WKT 2010 05 04 16 14 55 31.3200 -97.3300 251.000 457.0 130.666 4.810 -999.990 -999.990 1.307 ..P WKT 2010 05 04 16 24 55 31.3200 -97.3300 251.000 30.0 150.157 4.200 -999.990 -999.990 1.502 ..P WKT 2010 05 04 16 29 55 31.3200 -97.3300 251.000 122.0 148.309 6.970 -999.990 -999.990 1.483 ..P WKT 2010 05 04 16 34 55 31.3200 -97.3300 251.000 457.0 126.974 7.660 -999.990 -999.990 1.270 ..P WKT 2010 05 04 16 39 55 31.3200 -97.3300 251.000 30.0 155.748 5.910 -999.990 -999.990 1.557 ..P WKT 2010 05 04 16 44 55 31.3200 -97.3300 251.000 122.0 161.973 3.420 -999.990 -999.990 1.620 ..P WKT 2010 05 04 16 49 55 31.3200 -97.3300 251.000 457.0 123.102 3.390 -999.990 -999.990 1.231 ..P WKT 2010 05 04 17 04 55 31.3200 -97.3300 251.000 30.0 191.862 3.460 -999.990 -999.990 1.919 ..P WKT 2010 05 04 17 09 55 31.3200 -97.3300 251.000 122.0 200.302 4.190 -999.990 -999.990 2.003 ..P WKT 2010 05 04 17 14 55 31.3200 -97.3300 251.000 457.0 148.342 9.140 -999.990 -999.990 1.483 ..P WKT 2010 05 04 17 19 55 31.3200 -97.3300 251.000 30.0 179.885 3.520 -999.990 -999.990 1.799 ..P WKT 2010 05 04 17 24 55 31.3200 -97.3300 251.000 122.0 175.800 3.500 -999.990 -999.990 1.758 ..P WKT 2010 05 04 17 29 55 31.3200 -97.3300 251.000 457.0 153.346 3.830 -999.990 -999.990 1.533 ..P WKT 2010 05 04 17 39 55 31.3200 -97.3300 251.000 30.0 161.092 3.620 -999.990 -999.990 1.611 ..P WKT 2010 05 04 17 44 55 31.3200 -97.3300 251.000 122.0 157.893 3.660 -999.990 -999.990 1.579 ..P WKT 2010 05 04 17 49 55 31.3200 -97.3300 251.000 457.0 149.684 2.970 -999.990 -999.990 1.497 ..P WKT 2010 05 04 17 54 55 31.3200 -97.3300 251.000 30.0 160.400 3.350 -999.990 -999.990 1.604 ..P WKT 2010 05 04 17 59 55 31.3200 -97.3300 251.000 122.0 163.880 3.840 -999.990 -999.990 1.639 ..P WKT 2010 05 04 18 04 55 31.3200 -97.3300 251.000 457.0 156.090 2.590 -999.990 -999.990 1.561 ..P WKT 2010 05 04 18 14 55 31.3200 -97.3300 251.000 30.0 163.944 3.740 -999.990 -999.990 1.639 ..P WKT 2010 05 04 18 19 55 31.3200 -97.3300 251.000 122.0 166.230 3.580 -999.990 -999.990 1.662 ..P WKT 2010 05 04 18 24 55 31.3200 -97.3300 251.000 457.0 153.630 4.600 -999.990 -999.990 1.536 ..P WKT 2010 05 04 18 29 55 31.3200 -97.3300 251.000 30.0 161.204 2.940 -999.990 -999.990 1.612 ..P WKT 2010 05 04 18 34 55 31.3200 -97.3300 251.000 122.0 151.247 4.260 -999.990 -999.990 1.512 ..P WKT 2010 05 04 18 39 55 31.3200 -97.3300 251.000 457.0 150.473 3.780 -999.990 -999.990 1.505 ..P WKT 2010 05 04 18 49 55 31.3200 -97.3300 251.000 30.0 152.861 4.320 -999.990 -999.990 1.529 ..P WKT 2010 05 04 18 54 55 31.3200 -97.3300 251.000 122.0 151.709 3.140 -999.990 -999.990 1.517 ..P WKT 2010 05 04 18 59 55 31.3200 -97.3300 251.000 457.0 146.246 3.720 -999.990 -999.990 1.462 ..P WKT 2010 05 04 19 04 55 31.3200 -97.3300 251.000 30.0 151.355 3.140 -999.990 -999.990 1.514 ..P WKT 2010 05 04 19 09 55 31.3200 -97.3300 251.000 122.0 151.456 3.620 -999.990 -999.990 1.515 ..P WKT 2010 05 04 19 14 55 31.3200 -97.3300 251.000 457.0 140.427 3.820 -999.990 -999.990 1.404 ..P WKT 2010 05 04 19 24 55 31.3200 -97.3300 251.000 30.0 150.824 2.850 -999.990 -999.990 1.508 ..P WKT 2010 05 04 19 29 55 31.3200 -97.3300 251.000 122.0 143.592 3.590 -999.990 -999.990 1.436 ..P WKT 2010 05 04 19 34 55 31.3200 -97.3300 251.000 457.0 148.183 2.970 -999.990 -999.990 1.482 ..P WKT 2010 05 04 19 39 55 31.3200 -97.3300 251.000 30.0 144.846 2.750 -999.990 -999.990 1.448 ..P WKT 2010 05 04 19 44 55 31.3200 -97.3300 251.000 122.0 144.013 4.130 -999.990 -999.990 1.440 ..P WKT 2010 05 04 19 49 55 31.3200 -97.3300 251.000 457.0 145.823 2.850 -999.990 -999.990 1.458 ..P WKT 2010 05 04 19 59 55 31.3200 -97.3300 251.000 30.0 149.184 5.220 -999.990 -999.990 1.492 ..P WKT 2010 05 04 20 04 55 31.3200 -97.3300 251.000 122.0 149.066 2.750 -999.990 -999.990 1.491 ..P WKT 2010 05 04 20 09 55 31.3200 -97.3300 251.000 457.0 147.975 2.480 -999.990 -999.990 1.480 ..P WKT 2010 05 04 20 14 55 31.3200 -97.3300 251.000 30.0 146.605 2.920 -999.990 -999.990 1.466 ..P WKT 2010 05 04 20 19 55 31.3200 -97.3300 251.000 122.0 160.813 3.650 -999.990 -999.990 1.608 ..P WKT 2010 05 04 20 24 55 31.3200 -97.3300 251.000 457.0 147.760 4.150 -999.990 -999.990 1.478 ..P WKT 2010 05 04 20 34 55 31.3200 -97.3300 251.000 30.0 146.969 4.550 -999.990 -999.990 1.470 ..P WKT 2010 05 04 20 39 55 31.3200 -97.3300 251.000 122.0 147.268 2.880 -999.990 -999.990 1.473 ..P WKT 2010 05 04 20 44 55 31.3200 -97.3300 251.000 457.0 150.071 3.310 -999.990 -999.990 1.501 ..P WKT 2010 05 04 20 49 55 31.3200 -97.3300 251.000 30.0 154.264 3.860 -999.990 -999.990 1.543 ..P WKT 2010 05 04 20 54 55 31.3200 -97.3300 251.000 122.0 163.184 3.660 -999.990 -999.990 1.632 ..P WKT 2010 05 04 20 59 55 31.3200 -97.3300 251.000 457.0 146.241 3.170 -999.990 -999.990 1.462 ..P WKT 2010 05 04 21 09 55 31.3200 -97.3300 251.000 30.0 156.573 3.970 -999.990 -999.990 1.566 ..P WKT 2010 05 04 21 14 55 31.3200 -97.3300 251.000 122.0 150.198 2.930 -999.990 -999.990 1.502 ..P WKT 2010 05 04 21 19 55 31.3200 -97.3300 251.000 457.0 150.220 4.580 -999.990 -999.990 1.502 ..P WKT 2010 05 04 21 24 55 31.3200 -97.3300 251.000 30.0 151.076 5.570 -999.990 -999.990 1.511 ..P WKT 2010 05 04 21 29 55 31.3200 -97.3300 251.000 122.0 154.155 4.260 -999.990 -999.990 1.542 ..P WKT 2010 05 04 21 34 55 31.3200 -97.3300 251.000 457.0 151.396 3.190 -999.990 -999.990 1.514 ..P WKT 2010 05 04 21 44 55 31.3200 -97.3300 251.000 30.0 154.060 3.130 -999.990 -999.990 1.541 ..P WKT 2010 05 04 21 49 55 31.3200 -97.3300 251.000 122.0 152.254 4.670 -999.990 -999.990 1.523 ..P WKT 2010 05 04 21 54 55 31.3200 -97.3300 251.000 457.0 147.946 5.340 -999.990 -999.990 1.479 ..P WKT 2010 05 04 21 59 55 31.3200 -97.3300 251.000 30.0 144.611 4.820 -999.990 -999.990 1.446 ..P WKT 2010 05 04 22 04 55 31.3200 -97.3300 251.000 122.0 147.949 4.560 -999.990 -999.990 1.479 ..P WKT 2010 05 04 22 09 55 31.3200 -97.3300 251.000 457.0 143.224 2.770 -999.990 -999.990 1.432 ..P WKT 2010 05 04 22 19 55 31.3200 -97.3300 251.000 30.0 143.087 3.640 -999.990 -999.990 1.431 ..P WKT 2010 05 04 22 24 55 31.3200 -97.3300 251.000 122.0 150.595 3.720 -999.990 -999.990 1.506 ..P WKT 2010 05 04 22 29 55 31.3200 -97.3300 251.000 457.0 144.758 5.340 -999.990 -999.990 1.448 ..P WKT 2010 05 04 22 34 55 31.3200 -97.3300 251.000 30.0 165.332 4.430 -999.990 -999.990 1.653 ..P WKT 2010 05 04 22 39 55 31.3200 -97.3300 251.000 122.0 168.808 4.580 -999.990 -999.990 1.688 ..P WKT 2010 05 04 22 44 55 31.3200 -97.3300 251.000 457.0 159.079 5.160 -999.990 -999.990 1.591 ..P WKT 2010 05 04 22 54 55 31.3200 -97.3300 251.000 30.0 171.273 5.150 -999.990 -999.990 1.713 ..P WKT 2010 05 04 22 59 55 31.3200 -97.3300 251.000 122.0 175.403 4.500 -999.990 -999.990 1.754 ..P WKT 2010 05 04 23 04 55 31.3200 -97.3300 251.000 457.0 157.297 4.070 -999.990 -999.990 1.573 ..P WKT 2010 05 04 23 09 55 31.3200 -97.3300 251.000 30.0 170.879 4.360 -999.990 -999.990 1.709 ..P WKT 2010 05 04 23 14 55 31.3200 -97.3300 251.000 122.0 174.592 3.800 -999.990 -999.990 1.746 ..P WKT 2010 05 04 23 19 55 31.3200 -97.3300 251.000 457.0 157.460 4.440 -999.990 -999.990 1.575 ..P WKT 2010 05 04 23 29 55 31.3200 -97.3300 251.000 30.0 171.200 3.460 -999.990 -999.990 1.712 ..P WKT 2010 05 04 23 34 55 31.3200 -97.3300 251.000 122.0 182.337 3.320 -999.990 -999.990 1.823 ..P WKT 2010 05 04 23 39 55 31.3200 -97.3300 251.000 457.0 160.681 3.900 -999.990 -999.990 1.607 ..P WKT 2010 05 04 23 44 55 31.3200 -97.3300 251.000 30.0 170.011 3.670 -999.990 -999.990 1.700 ..P WKT 2010 05 04 23 49 55 31.3200 -97.3300 251.000 122.0 180.871 4.460 -999.990 -999.990 1.809 ..P WKT 2010 05 05 00 09 55 31.3200 -97.3300 251.000 457.0 175.502 3.740 -999.990 -999.990 1.755 ..P WKT 2010 05 05 00 10 25 31.3200 -97.3300 251.000 457.0 174.775 3.470 -999.990 -999.990 1.748 ..P WKT 2010 05 05 00 10 55 31.3200 -97.3300 251.000 457.0 177.662 3.600 -999.990 -999.990 1.777 ..P WKT 2010 05 05 00 11 25 31.3200 -97.3300 251.000 457.0 181.660 4.770 -999.990 -999.990 1.817 ..P WKT 2010 05 05 00 11 55 31.3200 -97.3300 251.000 457.0 184.269 3.350 -999.990 -999.990 1.843 ..P WKT 2010 05 05 00 12 25 31.3200 -97.3300 251.000 457.0 185.488 3.680 -999.990 -999.990 1.855 ..P WKT 2010 05 05 00 12 55 31.3200 -97.3300 251.000 457.0 178.091 3.880 -999.990 -999.990 1.781 ..P WKT 2010 05 05 00 13 25 31.3200 -97.3300 251.000 457.0 182.922 5.080 -999.990 -999.990 1.829 ..P WKT 2010 05 05 00 13 55 31.3200 -97.3300 251.000 457.0 188.589 4.550 -999.990 -999.990 1.886 ..P WKT 2010 05 05 00 14 25 31.3200 -97.3300 251.000 457.0 180.635 4.320 -999.990 -999.990 1.806 ..P WKT 2010 05 05 00 14 55 31.3200 -97.3300 251.000 457.0 183.800 4.090 -999.990 -999.990 1.838 ..P WKT 2010 05 05 00 19 55 31.3200 -97.3300 251.000 30.0 183.481 4.200 -999.990 -999.990 1.835 ..P WKT 2010 05 05 00 24 55 31.3200 -97.3300 251.000 122.0 189.278 4.310 -999.990 -999.990 1.893 ..P WKT 2010 05 05 00 29 55 31.3200 -97.3300 251.000 457.0 184.512 4.500 -999.990 -999.990 1.845 ..P WKT 2010 05 05 00 34 55 31.3200 -97.3300 251.000 30.0 188.363 4.170 -999.990 -999.990 1.884 ..P WKT 2010 05 05 00 39 55 31.3200 -97.3300 251.000 122.0 183.042 3.580 -999.990 -999.990 1.830 ..P WKT 2010 05 05 00 44 55 31.3200 -97.3300 251.000 457.0 193.564 3.010 -999.990 -999.990 1.936 ..P WKT 2010 05 05 00 54 55 31.3200 -97.3300 251.000 30.0 194.396 4.020 -999.990 -999.990 1.944 ..P WKT 2010 05 05 00 59 55 31.3200 -97.3300 251.000 122.0 185.540 4.030 -999.990 -999.990 1.855 ..P WKT 2010 05 05 01 04 55 31.3200 -97.3300 251.000 457.0 193.084 4.570 -999.990 -999.990 1.931 ..P WKT 2010 05 05 01 09 55 31.3200 -97.3300 251.000 30.0 188.954 5.490 -999.990 -999.990 1.890 ..P WKT 2010 05 05 01 14 55 31.3200 -97.3300 251.000 122.0 183.712 2.940 -999.990 -999.990 1.837 ..P WKT 2010 05 05 01 19 55 31.3200 -97.3300 251.000 457.0 178.468 2.670 -999.990 -999.990 1.785 ..P WKT 2010 05 05 01 29 55 31.3200 -97.3300 251.000 30.0 180.512 3.540 -999.990 -999.990 1.805 ..P WKT 2010 05 05 01 34 55 31.3200 -97.3300 251.000 122.0 177.513 3.490 -999.990 -999.990 1.775 ..P WKT 2010 05 05 01 39 55 31.3200 -97.3300 251.000 457.0 176.182 3.770 -999.990 -999.990 1.762 ..P WKT 2010 05 05 01 44 55 31.3200 -97.3300 251.000 30.0 175.129 4.050 -999.990 -999.990 1.751 ..P WKT 2010 05 05 01 49 55 31.3200 -97.3300 251.000 122.0 176.577 3.380 -999.990 -999.990 1.766 ..P WKT 2010 05 05 01 54 55 31.3200 -97.3300 251.000 457.0 174.690 5.190 -999.990 -999.990 1.747 ..P WKT 2010 05 05 02 04 55 31.3200 -97.3300 251.000 30.0 173.159 4.610 -999.990 -999.990 1.732 ..P WKT 2010 05 05 02 09 55 31.3200 -97.3300 251.000 122.0 178.242 5.130 -999.990 -999.990 1.782 ..P WKT 2010 05 05 02 14 55 31.3200 -97.3300 251.000 457.0 168.172 4.740 -999.990 -999.990 1.682 ..P WKT 2010 05 05 02 19 55 31.3200 -97.3300 251.000 30.0 169.363 4.820 -999.990 -999.990 1.694 ..P WKT 2010 05 05 02 24 55 31.3200 -97.3300 251.000 122.0 164.020 5.580 -999.990 -999.990 1.640 ..P WKT 2010 05 05 02 29 55 31.3200 -97.3300 251.000 457.0 162.152 5.170 -999.990 -999.990 1.622 ..P WKT 2010 05 05 02 39 55 31.3200 -97.3300 251.000 30.0 172.894 5.530 -999.990 -999.990 1.729 ..P WKT 2010 05 05 02 44 55 31.3200 -97.3300 251.000 122.0 161.455 6.890 -999.990 -999.990 1.615 ..P WKT 2010 05 05 02 49 55 31.3200 -97.3300 251.000 457.0 149.042 4.470 -999.990 -999.990 1.490 ..P WKT 2010 05 05 02 54 55 31.3200 -97.3300 251.000 30.0 168.602 3.680 -999.990 -999.990 1.686 ..P WKT 2010 05 05 02 59 55 31.3200 -97.3300 251.000 122.0 170.229 3.830 -999.990 -999.990 1.702 ..P WKT 2010 05 05 03 04 55 31.3200 -97.3300 251.000 457.0 153.646 2.410 -999.990 -999.990 1.536 ..P WKT 2010 05 05 03 14 55 31.3200 -97.3300 251.000 30.0 179.560 2.600 -999.990 -999.990 1.796 ..P WKT 2010 05 05 03 19 55 31.3200 -97.3300 251.000 122.0 166.174 3.270 -999.990 -999.990 1.662 ..P WKT 2010 05 05 03 24 55 31.3200 -97.3300 251.000 457.0 151.397 3.190 -999.990 -999.990 1.514 ..P WKT 2010 05 05 03 29 55 31.3200 -97.3300 251.000 30.0 175.823 3.480 -999.990 -999.990 1.758 ..P WKT 2010 05 05 03 34 55 31.3200 -97.3300 251.000 122.0 160.769 2.650 -999.990 -999.990 1.608 ..P WKT 2010 05 05 03 39 55 31.3200 -97.3300 251.000 457.0 154.611 2.890 -999.990 -999.990 1.546 ..P WKT 2010 05 05 03 49 55 31.3200 -97.3300 251.000 30.0 175.898 5.120 -999.990 -999.990 1.759 ..P WKT 2010 05 05 03 54 55 31.3200 -97.3300 251.000 122.0 158.162 2.430 -999.990 -999.990 1.582 ..P WKT 2010 05 05 03 59 55 31.3200 -97.3300 251.000 457.0 154.328 5.260 -999.990 -999.990 1.543 ..P WKT 2010 05 05 04 04 55 31.3200 -97.3300 251.000 30.0 172.460 2.190 -999.990 -999.990 1.725 ..P WKT 2010 05 05 04 09 55 31.3200 -97.3300 251.000 122.0 162.787 2.060 -999.990 -999.990 1.628 ..P WKT 2010 05 05 04 14 55 31.3200 -97.3300 251.000 457.0 147.831 3.170 -999.990 -999.990 1.478 ..P WKT 2010 05 05 04 24 55 31.3200 -97.3300 251.000 30.0 163.458 2.710 -999.990 -999.990 1.635 ..P WKT 2010 05 05 04 29 55 31.3200 -97.3300 251.000 122.0 160.121 2.150 -999.990 -999.990 1.601 ..P WKT 2010 05 05 04 34 55 31.3200 -97.3300 251.000 457.0 141.213 2.100 -999.990 -999.990 1.412 ..P WKT 2010 05 05 04 39 55 31.3200 -97.3300 251.000 30.0 167.904 2.110 -999.990 -999.990 1.679 ..P WKT 2010 05 05 04 44 55 31.3200 -97.3300 251.000 122.0 149.552 3.010 -999.990 -999.990 1.496 ..P WKT 2010 05 05 04 49 55 31.3200 -97.3300 251.000 457.0 152.053 2.860 -999.990 -999.990 1.521 ..P WKT 2010 05 05 05 04 55 31.3200 -97.3300 251.000 30.0 160.520 3.060 -999.990 -999.990 1.605 ..P WKT 2010 05 05 05 09 55 31.3200 -97.3300 251.000 122.0 155.023 4.650 -999.990 -999.990 1.550 ..P WKT 2010 05 05 05 14 55 31.3200 -97.3300 251.000 457.0 154.808 3.040 -999.990 -999.990 1.548 ..P WKT 2010 05 05 05 19 55 31.3200 -97.3300 251.000 30.0 162.935 3.830 -999.990 -999.990 1.629 ..P WKT 2010 05 05 05 24 55 31.3200 -97.3300 251.000 122.0 152.988 3.450 -999.990 -999.990 1.530 ..P WKT 2010 05 05 05 29 55 31.3200 -97.3300 251.000 457.0 169.735 3.360 -999.990 -999.990 1.697 ..P WKT 2010 05 05 05 39 55 31.3200 -97.3300 251.000 30.0 158.377 3.600 -999.990 -999.990 1.584 ..P WKT 2010 05 05 05 44 55 31.3200 -97.3300 251.000 122.0 151.127 4.110 -999.990 -999.990 1.511 ..P WKT 2010 05 05 05 49 55 31.3200 -97.3300 251.000 457.0 164.174 3.520 -999.990 -999.990 1.642 ..P WKT 2010 05 05 05 54 55 31.3200 -97.3300 251.000 30.0 159.844 4.130 -999.990 -999.990 1.598 ..P WKT 2010 05 05 05 59 55 31.3200 -97.3300 251.000 122.0 158.710 3.150 -999.990 -999.990 1.587 ..P WKT 2010 05 05 06 04 55 31.3200 -97.3300 251.000 457.0 159.385 3.930 -999.990 -999.990 1.594 ..P WKT 2010 05 05 06 14 55 31.3200 -97.3300 251.000 30.0 161.110 3.090 -999.990 -999.990 1.611 ..P WKT 2010 05 05 06 19 55 31.3200 -97.3300 251.000 122.0 160.632 3.050 -999.990 -999.990 1.606 ..P WKT 2010 05 05 06 24 55 31.3200 -97.3300 251.000 457.0 150.840 3.570 -999.990 -999.990 1.508 ..P WKT 2010 05 05 06 29 55 31.3200 -97.3300 251.000 30.0 159.815 2.860 -999.990 -999.990 1.598 ..P WKT 2010 05 05 06 34 55 31.3200 -97.3300 251.000 122.0 157.113 3.870 -999.990 -999.990 1.571 ..P WKT 2010 05 05 06 39 55 31.3200 -97.3300 251.000 457.0 146.070 3.280 -999.990 -999.990 1.461 ..P WKT 2010 05 05 06 49 55 31.3200 -97.3300 251.000 30.0 157.507 3.960 -999.990 -999.990 1.575 ..P WKT 2010 05 05 06 54 55 31.3200 -97.3300 251.000 122.0 159.551 3.190 -999.990 -999.990 1.596 ..P WKT 2010 05 05 06 59 55 31.3200 -97.3300 251.000 457.0 137.128 4.180 -999.990 -999.990 1.371 ..P WKT 2010 05 05 07 04 55 31.3200 -97.3300 251.000 30.0 153.631 4.840 -999.990 -999.990 1.536 ..P WKT 2010 05 05 07 09 55 31.3200 -97.3300 251.000 122.0 154.841 4.210 -999.990 -999.990 1.548 ..P WKT 2010 05 05 07 14 55 31.3200 -97.3300 251.000 457.0 132.696 2.870 -999.990 -999.990 1.327 ..P WKT 2010 05 05 07 24 55 31.3200 -97.3300 251.000 30.0 158.114 3.130 -999.990 -999.990 1.581 ..P WKT 2010 05 05 07 29 55 31.3200 -97.3300 251.000 122.0 157.160 4.530 -999.990 -999.990 1.572 ..P WKT 2010 05 05 07 34 55 31.3200 -97.3300 251.000 457.0 141.747 4.840 -999.990 -999.990 1.417 ..P WKT 2010 05 05 07 39 55 31.3200 -97.3300 251.000 30.0 155.112 4.320 -999.990 -999.990 1.551 ..P WKT 2010 05 05 07 44 55 31.3200 -97.3300 251.000 122.0 156.382 3.640 -999.990 -999.990 1.564 ..P WKT 2010 05 05 07 49 55 31.3200 -97.3300 251.000 457.0 137.633 3.030 -999.990 -999.990 1.376 ..P WKT 2010 05 05 07 59 55 31.3200 -97.3300 251.000 30.0 157.570 5.110 -999.990 -999.990 1.576 ..P WKT 2010 05 05 08 04 55 31.3200 -97.3300 251.000 122.0 157.052 4.120 -999.990 -999.990 1.571 ..P WKT 2010 05 05 08 09 55 31.3200 -97.3300 251.000 457.0 135.961 3.500 -999.990 -999.990 1.360 ..P WKT 2010 05 05 08 14 55 31.3200 -97.3300 251.000 30.0 158.798 3.660 -999.990 -999.990 1.588 ..P WKT 2010 05 05 08 19 55 31.3200 -97.3300 251.000 122.0 156.613 5.330 -999.990 -999.990 1.566 ..P WKT 2010 05 05 08 24 55 31.3200 -97.3300 251.000 457.0 144.140 4.800 -999.990 -999.990 1.441 ..P WKT 2010 05 05 08 34 55 31.3200 -97.3300 251.000 30.0 153.312 5.440 -999.990 -999.990 1.533 ..P WKT 2010 05 05 08 39 55 31.3200 -97.3300 251.000 122.0 154.939 4.650 -999.990 -999.990 1.549 ..P WKT 2010 05 05 08 44 55 31.3200 -97.3300 251.000 457.0 135.993 4.760 -999.990 -999.990 1.360 ..P WKT 2010 05 05 08 49 55 31.3200 -97.3300 251.000 30.0 156.803 4.400 -999.990 -999.990 1.568 ..P WKT 2010 05 05 08 54 55 31.3200 -97.3300 251.000 122.0 153.704 4.260 -999.990 -999.990 1.537 ..P WKT 2010 05 05 08 59 55 31.3200 -97.3300 251.000 457.0 135.871 3.990 -999.990 -999.990 1.359 ..P WKT 2010 05 05 09 09 55 31.3200 -97.3300 251.000 30.0 153.979 3.490 -999.990 -999.990 1.540 ..P WKT 2010 05 05 09 14 55 31.3200 -97.3300 251.000 122.0 148.496 4.670 -999.990 -999.990 1.485 ..P WKT 2010 05 05 09 19 55 31.3200 -97.3300 251.000 457.0 131.061 3.380 -999.990 -999.990 1.311 ..P WKT 2010 05 05 09 24 55 31.3200 -97.3300 251.000 30.0 151.155 3.650 -999.990 -999.990 1.512 ..P WKT 2010 05 05 09 29 55 31.3200 -97.3300 251.000 122.0 152.624 3.660 -999.990 -999.990 1.526 ..P WKT 2010 05 05 09 34 55 31.3200 -97.3300 251.000 457.0 134.076 3.880 -999.990 -999.990 1.341 ..P WKT 2010 05 05 09 44 55 31.3200 -97.3300 251.000 30.0 142.990 3.430 -999.990 -999.990 1.430 ..P WKT 2010 05 05 09 49 55 31.3200 -97.3300 251.000 122.0 148.627 3.640 -999.990 -999.990 1.486 ..P WKT 2010 05 05 09 54 55 31.3200 -97.3300 251.000 457.0 141.756 4.050 -999.990 -999.990 1.418 ..P WKT 2010 05 05 09 59 55 31.3200 -97.3300 251.000 30.0 152.259 4.010 -999.990 -999.990 1.523 ..P WKT 2010 05 05 10 04 55 31.3200 -97.3300 251.000 122.0 152.615 4.120 -999.990 -999.990 1.526 ..P WKT 2010 05 05 10 09 55 31.3200 -97.3300 251.000 457.0 135.459 4.090 -999.990 -999.990 1.355 ..P WKT 2010 05 05 10 19 55 31.3200 -97.3300 251.000 30.0 146.397 3.750 -999.990 -999.990 1.464 ..P WKT 2010 05 05 10 24 55 31.3200 -97.3300 251.000 122.0 149.474 3.690 -999.990 -999.990 1.495 ..P WKT 2010 05 05 10 29 55 31.3200 -97.3300 251.000 457.0 139.347 3.720 -999.990 -999.990 1.393 ..P WKT 2010 05 05 10 34 55 31.3200 -97.3300 251.000 30.0 149.928 3.970 -999.990 -999.990 1.499 ..P WKT 2010 05 05 10 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 05 10 44 55 31.3200 -97.3300 251.000 457.0 143.156 4.470 -999.990 -999.990 1.432 ..P WKT 2010 05 05 10 54 55 31.3200 -97.3300 251.000 30.0 152.267 4.220 -999.990 -999.990 1.523 ..P WKT 2010 05 05 10 59 55 31.3200 -97.3300 251.000 122.0 146.071 4.550 -999.990 -999.990 1.461 ..P WKT 2010 05 05 11 04 55 31.3200 -97.3300 251.000 457.0 143.072 4.860 -999.990 -999.990 1.431 ..P WKT 2010 05 05 11 09 55 31.3200 -97.3300 251.000 30.0 152.025 4.370 -999.990 -999.990 1.520 ..P WKT 2010 05 05 11 14 55 31.3200 -97.3300 251.000 122.0 153.334 4.380 -999.990 -999.990 1.533 ..P WKT 2010 05 05 11 19 55 31.3200 -97.3300 251.000 457.0 144.498 4.240 -999.990 -999.990 1.445 ..P WKT 2010 05 05 11 29 55 31.3200 -97.3300 251.000 30.0 149.935 4.490 -999.990 -999.990 1.499 ..P WKT 2010 05 05 11 34 55 31.3200 -97.3300 251.000 122.0 147.115 4.430 -999.990 -999.990 1.471 ..P WKT 2010 05 05 11 39 55 31.3200 -97.3300 251.000 457.0 144.434 4.250 -999.990 -999.990 1.444 ..P WKT 2010 05 05 11 44 55 31.3200 -97.3300 251.000 30.0 151.758 4.680 -999.990 -999.990 1.518 ..P WKT 2010 05 05 11 49 55 31.3200 -97.3300 251.000 122.0 145.047 4.290 -999.990 -999.990 1.450 ..P WKT 2010 05 05 12 09 55 31.3200 -97.3300 251.000 457.0 143.882 4.380 -999.990 -999.990 1.439 ..P WKT 2010 05 05 12 10 25 31.3200 -97.3300 251.000 457.0 142.233 4.150 -999.990 -999.990 1.422 ..P WKT 2010 05 05 12 10 55 31.3200 -97.3300 251.000 457.0 145.585 4.330 -999.990 -999.990 1.456 ..P WKT 2010 05 05 12 11 25 31.3200 -97.3300 251.000 457.0 141.157 3.960 -999.990 -999.990 1.412 ..P WKT 2010 05 05 12 11 55 31.3200 -97.3300 251.000 457.0 144.510 4.310 -999.990 -999.990 1.445 ..P WKT 2010 05 05 12 12 25 31.3200 -97.3300 251.000 457.0 144.250 4.050 -999.990 -999.990 1.443 ..P WKT 2010 05 05 12 12 55 31.3200 -97.3300 251.000 457.0 142.322 3.870 -999.990 -999.990 1.423 ..P WKT 2010 05 05 12 13 25 31.3200 -97.3300 251.000 457.0 149.566 4.060 -999.990 -999.990 1.496 ..P WKT 2010 05 05 12 13 55 31.3200 -97.3300 251.000 457.0 141.246 4.820 -999.990 -999.990 1.412 ..P WKT 2010 05 05 12 14 25 31.3200 -97.3300 251.000 457.0 138.485 4.160 -999.990 -999.990 1.385 ..P WKT 2010 05 05 12 14 55 31.3200 -97.3300 251.000 457.0 139.336 4.120 -999.990 -999.990 1.393 ..P WKT 2010 05 05 12 19 55 31.3200 -97.3300 251.000 30.0 146.740 4.180 -999.990 -999.990 1.467 ..P WKT 2010 05 05 12 24 55 31.3200 -97.3300 251.000 122.0 149.420 5.420 -999.990 -999.990 1.494 ..P WKT 2010 05 05 12 29 55 31.3200 -97.3300 251.000 457.0 143.483 5.050 -999.990 -999.990 1.435 ..P WKT 2010 05 05 12 34 55 31.3200 -97.3300 251.000 30.0 155.336 5.060 -999.990 -999.990 1.553 ..P WKT 2010 05 05 12 39 55 31.3200 -97.3300 251.000 122.0 156.071 4.230 -999.990 -999.990 1.561 ..P WKT 2010 05 05 12 44 55 31.3200 -97.3300 251.000 457.0 146.242 4.420 -999.990 -999.990 1.462 ..P WKT 2010 05 05 12 54 55 31.3200 -97.3300 251.000 30.0 151.797 4.480 -999.990 -999.990 1.518 ..P WKT 2010 05 05 12 59 55 31.3200 -97.3300 251.000 122.0 149.945 5.070 -999.990 -999.990 1.499 ..P WKT 2010 05 05 13 04 55 31.3200 -97.3300 251.000 457.0 142.253 4.590 -999.990 -999.990 1.423 ..P WKT 2010 05 05 13 09 55 31.3200 -97.3300 251.000 30.0 149.856 4.320 -999.990 -999.990 1.499 ..P WKT 2010 05 05 13 14 55 31.3200 -97.3300 251.000 122.0 148.282 4.680 -999.990 -999.990 1.483 ..P WKT 2010 05 05 13 19 55 31.3200 -97.3300 251.000 457.0 145.039 5.050 -999.990 -999.990 1.450 ..P WKT 2010 05 05 13 29 55 31.3200 -97.3300 251.000 30.0 150.075 4.450 -999.990 -999.990 1.501 ..P WKT 2010 05 05 13 34 55 31.3200 -97.3300 251.000 122.0 149.176 4.100 -999.990 -999.990 1.492 ..P WKT 2010 05 05 13 39 55 31.3200 -97.3300 251.000 457.0 146.887 4.540 -999.990 -999.990 1.469 ..P WKT 2010 05 05 13 44 55 31.3200 -97.3300 251.000 30.0 159.897 4.870 -999.990 -999.990 1.599 ..P WKT 2010 05 05 13 49 55 31.3200 -97.3300 251.000 122.0 152.321 4.840 -999.990 -999.990 1.523 ..P WKT 2010 05 05 13 54 55 31.3200 -97.3300 251.000 457.0 153.231 4.730 -999.990 -999.990 1.532 ..P WKT 2010 05 05 14 04 55 31.3200 -97.3300 251.000 30.0 158.647 4.890 -999.990 -999.990 1.586 ..P WKT 2010 05 05 14 09 55 31.3200 -97.3300 251.000 122.0 163.294 4.730 -999.990 -999.990 1.633 ..P WKT 2010 05 05 14 14 55 31.3200 -97.3300 251.000 457.0 152.775 5.240 -999.990 -999.990 1.528 ..P WKT 2010 05 05 14 19 55 31.3200 -97.3300 251.000 30.0 159.788 4.940 -999.990 -999.990 1.598 ..P WKT 2010 05 05 14 24 55 31.3200 -97.3300 251.000 122.0 168.192 4.580 -999.990 -999.990 1.682 ..P WKT 2010 05 05 14 29 55 31.3200 -97.3300 251.000 457.0 155.167 4.090 -999.990 -999.990 1.552 ..P WKT 2010 05 05 14 39 55 31.3200 -97.3300 251.000 30.0 171.460 4.410 -999.990 -999.990 1.715 ..P WKT 2010 05 05 14 44 55 31.3200 -97.3300 251.000 122.0 172.948 3.970 -999.990 -999.990 1.729 ..P WKT 2010 05 05 14 49 55 31.3200 -97.3300 251.000 457.0 148.825 3.900 -999.990 -999.990 1.488 ..P WKT 2010 05 05 14 54 55 31.3200 -97.3300 251.000 30.0 160.751 3.740 -999.990 -999.990 1.608 ..P WKT 2010 05 05 14 59 55 31.3200 -97.3300 251.000 122.0 162.238 4.010 -999.990 -999.990 1.622 ..P WKT 2010 05 05 15 04 55 31.3200 -97.3300 251.000 457.0 160.524 6.060 -999.990 -999.990 1.605 ..P WKT 2010 05 05 15 14 55 31.3200 -97.3300 251.000 30.0 162.325 4.000 -999.990 -999.990 1.623 ..P WKT 2010 05 05 15 19 55 31.3200 -97.3300 251.000 122.0 172.246 3.230 -999.990 -999.990 1.722 ..P WKT 2010 05 05 15 24 55 31.3200 -97.3300 251.000 457.0 181.053 3.270 -999.990 -999.990 1.811 ..P WKT 2010 05 05 15 29 55 31.3200 -97.3300 251.000 30.0 172.457 3.080 -999.990 -999.990 1.725 ..P WKT 2010 05 05 15 34 55 31.3200 -97.3300 251.000 122.0 169.568 3.100 -999.990 -999.990 1.696 ..P WKT 2010 05 05 15 39 55 31.3200 -97.3300 251.000 457.0 192.442 3.480 -999.990 -999.990 1.924 ..P WKT 2010 05 05 15 49 55 31.3200 -97.3300 251.000 30.0 166.334 3.040 -999.990 -999.990 1.663 ..P WKT 2010 05 05 15 54 55 31.3200 -97.3300 251.000 122.0 167.623 2.820 -999.990 -999.990 1.676 ..P WKT 2010 05 05 15 59 55 31.3200 -97.3300 251.000 457.0 173.369 5.990 -999.990 -999.990 1.734 ..P WKT 2010 05 05 16 04 55 31.3200 -97.3300 251.000 30.0 165.188 3.440 -999.990 -999.990 1.652 ..P WKT 2010 05 05 16 09 55 31.3200 -97.3300 251.000 122.0 170.934 5.030 -999.990 -999.990 1.709 ..P WKT 2010 05 05 16 14 55 31.3200 -97.3300 251.000 457.0 164.146 2.970 -999.990 -999.990 1.641 ..P WKT 2010 05 05 16 24 55 31.3200 -97.3300 251.000 30.0 168.833 2.900 -999.990 -999.990 1.688 ..P WKT 2010 05 05 16 29 55 31.3200 -97.3300 251.000 122.0 169.447 3.630 -999.990 -999.990 1.694 ..P WKT 2010 05 05 16 34 55 31.3200 -97.3300 251.000 457.0 166.438 3.310 -999.990 -999.990 1.664 ..P WKT 2010 05 05 16 39 55 31.3200 -97.3300 251.000 30.0 167.328 2.880 -999.990 -999.990 1.673 ..P WKT 2010 05 05 16 44 55 31.3200 -97.3300 251.000 122.0 173.236 2.770 -999.990 -999.990 1.732 ..P WKT 2010 05 05 16 49 55 31.3200 -97.3300 251.000 457.0 167.440 2.980 -999.990 -999.990 1.674 ..P WKT 2010 05 05 17 04 55 31.3200 -97.3300 251.000 30.0 176.178 4.640 -999.990 -999.990 1.762 ..P WKT 2010 05 05 17 09 55 31.3200 -97.3300 251.000 122.0 178.568 2.650 -999.990 -999.990 1.786 ..P WKT 2010 05 05 17 14 55 31.3200 -97.3300 251.000 457.0 172.317 2.660 -999.990 -999.990 1.723 ..P WKT 2010 05 05 17 19 55 31.3200 -97.3300 251.000 30.0 172.199 2.390 -999.990 -999.990 1.722 ..P WKT 2010 05 05 17 24 55 31.3200 -97.3300 251.000 122.0 180.722 4.680 -999.990 -999.990 1.807 ..P WKT 2010 05 05 17 29 55 31.3200 -97.3300 251.000 457.0 170.848 2.250 -999.990 -999.990 1.708 ..P WKT 2010 05 05 17 39 55 31.3200 -97.3300 251.000 30.0 171.641 3.400 -999.990 -999.990 1.716 ..P WKT 2010 05 05 17 44 55 31.3200 -97.3300 251.000 122.0 166.420 3.260 -999.990 -999.990 1.664 ..P WKT 2010 05 05 17 49 55 31.3200 -97.3300 251.000 457.0 165.379 5.020 -999.990 -999.990 1.654 ..P WKT 2010 05 05 17 54 55 31.3200 -97.3300 251.000 30.0 158.903 6.190 -999.990 -999.990 1.589 ..P WKT 2010 05 05 17 59 55 31.3200 -97.3300 251.000 122.0 163.439 5.750 -999.990 -999.990 1.634 ..P WKT 2010 05 05 18 04 55 31.3200 -97.3300 251.000 457.0 158.495 4.890 -999.990 -999.990 1.585 ..P WKT 2010 05 05 18 14 55 31.3200 -97.3300 251.000 30.0 161.474 3.490 -999.990 -999.990 1.615 ..P WKT 2010 05 05 18 19 55 31.3200 -97.3300 251.000 122.0 162.426 5.330 -999.990 -999.990 1.624 ..P WKT 2010 05 05 18 24 55 31.3200 -97.3300 251.000 457.0 163.935 6.350 -999.990 -999.990 1.639 ..P WKT 2010 05 05 18 29 55 31.3200 -97.3300 251.000 30.0 161.262 4.870 -999.990 -999.990 1.613 ..P WKT 2010 05 05 18 34 55 31.3200 -97.3300 251.000 122.0 165.142 4.380 -999.990 -999.990 1.651 ..P WKT 2010 05 05 18 39 55 31.3200 -97.3300 251.000 457.0 159.540 2.490 -999.990 -999.990 1.595 ..P WKT 2010 05 05 18 49 55 31.3200 -97.3300 251.000 30.0 167.800 2.470 -999.990 -999.990 1.678 ..P WKT 2010 05 05 18 54 55 31.3200 -97.3300 251.000 122.0 173.434 4.170 -999.990 -999.990 1.734 ..P WKT 2010 05 05 18 59 55 31.3200 -97.3300 251.000 457.0 163.866 4.030 -999.990 -999.990 1.639 ..P WKT 2010 05 05 19 04 55 31.3200 -97.3300 251.000 30.0 168.385 3.670 -999.990 -999.990 1.684 ..P WKT 2010 05 05 19 09 55 31.3200 -97.3300 251.000 122.0 174.438 2.970 -999.990 -999.990 1.744 ..P WKT 2010 05 05 19 14 55 31.3200 -97.3300 251.000 457.0 171.704 2.680 -999.990 -999.990 1.717 ..P WKT 2010 05 05 19 24 55 31.3200 -97.3300 251.000 30.0 171.119 2.380 -999.990 -999.990 1.711 ..P WKT 2010 05 05 19 29 55 31.3200 -97.3300 251.000 122.0 174.383 2.280 -999.990 -999.990 1.744 ..P WKT 2010 05 05 19 34 55 31.3200 -97.3300 251.000 457.0 162.441 2.900 -999.990 -999.990 1.624 ..P WKT 2010 05 05 19 39 55 31.3200 -97.3300 251.000 30.0 165.845 4.330 -999.990 -999.990 1.658 ..P WKT 2010 05 05 19 44 55 31.3200 -97.3300 251.000 122.0 173.294 3.650 -999.990 -999.990 1.733 ..P WKT 2010 05 05 19 49 55 31.3200 -97.3300 251.000 457.0 169.583 3.030 -999.990 -999.990 1.696 ..P WKT 2010 05 05 19 59 55 31.3200 -97.3300 251.000 30.0 159.827 2.950 -999.990 -999.990 1.598 ..P WKT 2010 05 05 20 04 55 31.3200 -97.3300 251.000 122.0 168.016 3.880 -999.990 -999.990 1.680 ..P WKT 2010 05 05 20 09 55 31.3200 -97.3300 251.000 457.0 165.599 3.630 -999.990 -999.990 1.656 ..P WKT 2010 05 05 20 14 55 31.3200 -97.3300 251.000 30.0 166.532 3.100 -999.990 -999.990 1.665 ..P WKT 2010 05 05 20 19 55 31.3200 -97.3300 251.000 122.0 174.443 4.510 -999.990 -999.990 1.744 ..P WKT 2010 05 05 20 24 55 31.3200 -97.3300 251.000 457.0 167.002 3.850 -999.990 -999.990 1.670 ..P WKT 2010 05 05 20 34 55 31.3200 -97.3300 251.000 30.0 170.901 3.910 -999.990 -999.990 1.709 ..P WKT 2010 05 05 20 39 55 31.3200 -97.3300 251.000 122.0 184.754 3.920 -999.990 -999.990 1.848 ..P WKT 2010 05 05 20 44 55 31.3200 -97.3300 251.000 457.0 176.556 4.060 -999.990 -999.990 1.766 ..P WKT 2010 05 05 20 49 55 31.3200 -97.3300 251.000 30.0 184.269 3.890 -999.990 -999.990 1.843 ..P WKT 2010 05 05 20 54 55 31.3200 -97.3300 251.000 122.0 186.119 3.680 -999.990 -999.990 1.861 ..P WKT 2010 05 05 20 59 55 31.3200 -97.3300 251.000 457.0 184.899 3.870 -999.990 -999.990 1.849 ..P WKT 2010 05 05 21 09 55 31.3200 -97.3300 251.000 30.0 177.333 2.770 -999.990 -999.990 1.773 ..P WKT 2010 05 05 21 14 55 31.3200 -97.3300 251.000 122.0 184.389 3.490 -999.990 -999.990 1.844 ..P WKT 2010 05 05 21 19 55 31.3200 -97.3300 251.000 457.0 178.880 4.140 -999.990 -999.990 1.789 ..P WKT 2010 05 05 21 24 55 31.3200 -97.3300 251.000 30.0 178.119 3.670 -999.990 -999.990 1.781 ..P WKT 2010 05 05 21 29 55 31.3200 -97.3300 251.000 122.0 187.130 4.030 -999.990 -999.990 1.871 ..P WKT 2010 05 05 21 34 55 31.3200 -97.3300 251.000 457.0 179.527 5.210 -999.990 -999.990 1.795 ..P WKT 2010 05 05 21 44 55 31.3200 -97.3300 251.000 30.0 171.361 3.380 -999.990 -999.990 1.714 ..P WKT 2010 05 05 21 49 55 31.3200 -97.3300 251.000 122.0 177.500 4.410 -999.990 -999.990 1.775 ..P WKT 2010 05 05 21 54 55 31.3200 -97.3300 251.000 457.0 173.028 5.330 -999.990 -999.990 1.730 ..P WKT 2010 05 05 21 59 55 31.3200 -97.3300 251.000 30.0 190.757 6.800 -999.990 -999.990 1.908 ..P WKT 2010 05 05 22 04 55 31.3200 -97.3300 251.000 122.0 200.528 6.810 -999.990 -999.990 2.005 ..P WKT 2010 05 05 22 09 55 31.3200 -97.3300 251.000 457.0 192.425 8.550 -999.990 -999.990 1.924 ..P WKT 2010 05 05 22 19 55 31.3200 -97.3300 251.000 30.0 204.408 4.650 -999.990 -999.990 2.044 ..P WKT 2010 05 05 22 24 55 31.3200 -97.3300 251.000 122.0 211.228 6.070 -999.990 -999.990 2.112 ..P WKT 2010 05 05 22 29 55 31.3200 -97.3300 251.000 457.0 198.915 6.610 -999.990 -999.990 1.989 ..P WKT 2010 05 05 22 34 55 31.3200 -97.3300 251.000 30.0 201.964 5.410 -999.990 -999.990 2.020 ..P WKT 2010 05 05 22 39 55 31.3200 -97.3300 251.000 122.0 206.689 4.790 -999.990 -999.990 2.067 ..P WKT 2010 05 05 22 44 55 31.3200 -97.3300 251.000 457.0 203.314 3.990 -999.990 -999.990 2.033 ..P WKT 2010 05 05 22 54 55 31.3200 -97.3300 251.000 30.0 193.050 4.120 -999.990 -999.990 1.931 ..P WKT 2010 05 05 22 59 55 31.3200 -97.3300 251.000 122.0 194.962 3.820 -999.990 -999.990 1.950 ..P WKT 2010 05 05 23 04 55 31.3200 -97.3300 251.000 457.0 199.947 3.850 -999.990 -999.990 1.999 ..P WKT 2010 05 05 23 09 55 31.3200 -97.3300 251.000 30.0 187.332 4.750 -999.990 -999.990 1.873 ..P WKT 2010 05 05 23 14 55 31.3200 -97.3300 251.000 122.0 197.626 4.430 -999.990 -999.990 1.976 ..P WKT 2010 05 05 23 19 55 31.3200 -97.3300 251.000 457.0 193.251 4.830 -999.990 -999.990 1.933 ..P WKT 2010 05 05 23 29 55 31.3200 -97.3300 251.000 30.0 183.537 4.610 -999.990 -999.990 1.835 ..P WKT 2010 05 05 23 34 55 31.3200 -97.3300 251.000 122.0 184.204 5.560 -999.990 -999.990 1.842 ..P WKT 2010 05 05 23 39 55 31.3200 -97.3300 251.000 457.0 180.820 5.610 -999.990 -999.990 1.808 ..P WKT 2010 05 05 23 44 55 31.3200 -97.3300 251.000 30.0 186.377 8.380 -999.990 -999.990 1.864 ..P WKT 2010 05 05 23 49 55 31.3200 -97.3300 251.000 122.0 183.830 8.010 -999.990 -999.990 1.838 ..P WKT 2010 05 06 00 09 55 31.3200 -97.3300 251.000 457.0 172.101 5.720 -999.990 -999.990 1.721 ..P WKT 2010 05 06 00 10 25 31.3200 -97.3300 251.000 457.0 175.399 5.490 -999.990 -999.990 1.754 ..P WKT 2010 05 06 00 10 55 31.3200 -97.3300 251.000 457.0 177.020 5.280 -999.990 -999.990 1.770 ..P WKT 2010 05 06 00 11 25 31.3200 -97.3300 251.000 457.0 173.891 5.200 -999.990 -999.990 1.739 ..P WKT 2010 05 06 00 11 55 31.3200 -97.3300 251.000 457.0 172.718 5.590 -999.990 -999.990 1.727 ..P WKT 2010 05 06 00 12 25 31.3200 -97.3300 251.000 457.0 170.986 5.510 -999.990 -999.990 1.710 ..P WKT 2010 05 06 00 12 55 31.3200 -97.3300 251.000 457.0 169.255 6.310 -999.990 -999.990 1.693 ..P WKT 2010 05 06 00 13 25 31.3200 -97.3300 251.000 457.0 174.229 6.360 -999.990 -999.990 1.742 ..P WKT 2010 05 06 00 13 55 31.3200 -97.3300 251.000 457.0 172.218 6.380 -999.990 -999.990 1.722 ..P WKT 2010 05 06 00 14 25 31.3200 -97.3300 251.000 457.0 174.398 6.450 -999.990 -999.990 1.744 ..P WKT 2010 05 06 00 14 55 31.3200 -97.3300 251.000 457.0 171.269 6.400 -999.990 -999.990 1.713 ..P WKT 2010 05 06 00 19 55 31.3200 -97.3300 251.000 30.0 179.100 7.900 -999.990 -999.990 1.791 ..P WKT 2010 05 06 00 24 55 31.3200 -97.3300 251.000 122.0 179.664 8.290 -999.990 -999.990 1.797 ..P WKT 2010 05 06 00 29 55 31.3200 -97.3300 251.000 457.0 172.965 7.020 -999.990 -999.990 1.730 ..P WKT 2010 05 06 00 34 55 31.3200 -97.3300 251.000 30.0 175.206 6.780 -999.990 -999.990 1.752 ..P WKT 2010 05 06 00 39 55 31.3200 -97.3300 251.000 122.0 176.888 3.590 -999.990 -999.990 1.769 ..P WKT 2010 05 06 00 44 55 31.3200 -97.3300 251.000 457.0 173.543 3.470 -999.990 -999.990 1.735 ..P WKT 2010 05 06 00 54 55 31.3200 -97.3300 251.000 30.0 173.613 4.540 -999.990 -999.990 1.736 ..P WKT 2010 05 06 00 59 55 31.3200 -97.3300 251.000 122.0 176.191 3.630 -999.990 -999.990 1.762 ..P WKT 2010 05 06 01 04 55 31.3200 -97.3300 251.000 457.0 165.642 4.270 -999.990 -999.990 1.656 ..P WKT 2010 05 06 01 09 55 31.3200 -97.3300 251.000 30.0 181.066 3.990 -999.990 -999.990 1.811 ..P WKT 2010 05 06 01 14 55 31.3200 -97.3300 251.000 122.0 173.310 4.090 -999.990 -999.990 1.733 ..P WKT 2010 05 06 01 19 55 31.3200 -97.3300 251.000 457.0 177.284 6.060 -999.990 -999.990 1.773 ..P WKT 2010 05 06 01 29 55 31.3200 -97.3300 251.000 30.0 171.050 4.980 -999.990 -999.990 1.711 ..P WKT 2010 05 06 01 34 55 31.3200 -97.3300 251.000 122.0 164.474 5.070 -999.990 -999.990 1.645 ..P WKT 2010 05 06 01 39 55 31.3200 -97.3300 251.000 457.0 163.761 5.430 -999.990 -999.990 1.638 ..P WKT 2010 05 06 01 44 55 31.3200 -97.3300 251.000 30.0 172.119 5.270 -999.990 -999.990 1.721 ..P WKT 2010 05 06 01 49 55 31.3200 -97.3300 251.000 122.0 160.521 5.230 -999.990 -999.990 1.605 ..P WKT 2010 05 06 01 54 55 31.3200 -97.3300 251.000 457.0 163.715 5.390 -999.990 -999.990 1.637 ..P WKT 2010 05 06 02 04 55 31.3200 -97.3300 251.000 30.0 175.983 5.480 -999.990 -999.990 1.760 ..P WKT 2010 05 06 02 09 55 31.3200 -97.3300 251.000 122.0 159.105 5.570 -999.990 -999.990 1.591 ..P WKT 2010 05 06 02 14 55 31.3200 -97.3300 251.000 457.0 166.643 5.190 -999.990 -999.990 1.666 ..P WKT 2010 05 06 02 19 55 31.3200 -97.3300 251.000 30.0 176.553 5.420 -999.990 -999.990 1.766 ..P WKT 2010 05 06 02 24 55 31.3200 -97.3300 251.000 122.0 167.908 5.390 -999.990 -999.990 1.679 ..P WKT 2010 05 06 02 29 55 31.3200 -97.3300 251.000 457.0 159.544 5.230 -999.990 -999.990 1.595 ..P WKT 2010 05 06 02 39 55 31.3200 -97.3300 251.000 30.0 173.878 4.450 -999.990 -999.990 1.739 ..P WKT 2010 05 06 02 44 55 31.3200 -97.3300 251.000 122.0 159.201 4.520 -999.990 -999.990 1.592 ..P WKT 2010 05 06 02 49 55 31.3200 -97.3300 251.000 457.0 164.186 4.990 -999.990 -999.990 1.642 ..P WKT 2010 05 06 02 54 55 31.3200 -97.3300 251.000 30.0 169.448 4.430 -999.990 -999.990 1.694 ..P WKT 2010 05 06 02 59 55 31.3200 -97.3300 251.000 122.0 159.096 4.300 -999.990 -999.990 1.591 ..P WKT 2010 05 06 03 04 55 31.3200 -97.3300 251.000 457.0 157.807 4.640 -999.990 -999.990 1.578 ..P WKT 2010 05 06 03 14 55 31.3200 -97.3300 251.000 30.0 170.063 3.980 -999.990 -999.990 1.701 ..P WKT 2010 05 06 03 19 55 31.3200 -97.3300 251.000 122.0 158.798 3.400 -999.990 -999.990 1.588 ..P WKT 2010 05 06 03 24 55 31.3200 -97.3300 251.000 457.0 159.520 3.530 -999.990 -999.990 1.595 ..P WKT 2010 05 06 03 29 55 31.3200 -97.3300 251.000 30.0 174.177 3.890 -999.990 -999.990 1.742 ..P WKT 2010 05 06 03 34 55 31.3200 -97.3300 251.000 122.0 162.914 3.790 -999.990 -999.990 1.629 ..P WKT 2010 05 06 03 39 55 31.3200 -97.3300 251.000 457.0 161.127 2.810 -999.990 -999.990 1.611 ..P WKT 2010 05 06 03 49 55 31.3200 -97.3300 251.000 30.0 167.963 3.170 -999.990 -999.990 1.680 ..P WKT 2010 05 06 03 54 55 31.3200 -97.3300 251.000 122.0 163.490 3.390 -999.990 -999.990 1.635 ..P WKT 2010 05 06 03 59 55 31.3200 -97.3300 251.000 457.0 164.868 3.750 -999.990 -999.990 1.649 ..P WKT 2010 05 06 04 04 55 31.3200 -97.3300 251.000 30.0 172.374 3.570 -999.990 -999.990 1.724 ..P WKT 2010 05 06 04 09 55 31.3200 -97.3300 251.000 122.0 162.051 2.240 -999.990 -999.990 1.621 ..P WKT 2010 05 06 04 14 55 31.3200 -97.3300 251.000 457.0 150.338 3.450 -999.990 -999.990 1.503 ..P WKT 2010 05 06 04 24 55 31.3200 -97.3300 251.000 30.0 165.468 2.250 -999.990 -999.990 1.655 ..P WKT 2010 05 06 04 29 55 31.3200 -97.3300 251.000 122.0 164.736 3.710 -999.990 -999.990 1.647 ..P WKT 2010 05 06 04 34 55 31.3200 -97.3300 251.000 457.0 159.549 4.240 -999.990 -999.990 1.595 ..P WKT 2010 05 06 04 39 55 31.3200 -97.3300 251.000 30.0 158.262 3.280 -999.990 -999.990 1.583 ..P WKT 2010 05 06 04 44 55 31.3200 -97.3300 251.000 122.0 164.212 3.140 -999.990 -999.990 1.642 ..P WKT 2010 05 06 04 49 55 31.3200 -97.3300 251.000 457.0 163.759 3.980 -999.990 -999.990 1.638 ..P WKT 2010 05 06 05 04 55 31.3200 -97.3300 251.000 30.0 168.207 5.410 -999.990 -999.990 1.682 ..P WKT 2010 05 06 05 09 55 31.3200 -97.3300 251.000 122.0 164.255 4.740 -999.990 -999.990 1.643 ..P WKT 2010 05 06 05 14 55 31.3200 -97.3300 251.000 457.0 170.323 5.840 -999.990 -999.990 1.703 ..P WKT 2010 05 06 05 19 55 31.3200 -97.3300 251.000 30.0 174.998 6.690 -999.990 -999.990 1.750 ..P WKT 2010 05 06 05 24 55 31.3200 -97.3300 251.000 122.0 176.055 6.620 -999.990 -999.990 1.761 ..P WKT 2010 05 06 05 29 55 31.3200 -97.3300 251.000 457.0 167.374 5.020 -999.990 -999.990 1.674 ..P WKT 2010 05 06 05 39 55 31.3200 -97.3300 251.000 30.0 174.258 7.150 -999.990 -999.990 1.743 ..P WKT 2010 05 06 05 44 55 31.3200 -97.3300 251.000 122.0 180.361 5.690 -999.990 -999.990 1.804 ..P WKT 2010 05 06 05 49 55 31.3200 -97.3300 251.000 457.0 163.517 5.670 -999.990 -999.990 1.635 ..P WKT 2010 05 06 05 54 55 31.3200 -97.3300 251.000 30.0 173.793 4.950 -999.990 -999.990 1.738 ..P WKT 2010 05 06 05 59 55 31.3200 -97.3300 251.000 122.0 170.022 4.430 -999.990 -999.990 1.700 ..P WKT 2010 05 06 06 04 55 31.3200 -97.3300 251.000 457.0 155.824 5.490 -999.990 -999.990 1.558 ..P WKT 2010 05 06 06 14 55 31.3200 -97.3300 251.000 30.0 161.078 4.480 -999.990 -999.990 1.611 ..P WKT 2010 05 06 06 19 55 31.3200 -97.3300 251.000 122.0 173.852 3.450 -999.990 -999.990 1.739 ..P WKT 2010 05 06 06 24 55 31.3200 -97.3300 251.000 457.0 162.020 3.400 -999.990 -999.990 1.620 ..P WKT 2010 05 06 06 29 55 31.3200 -97.3300 251.000 30.0 174.236 2.990 -999.990 -999.990 1.742 ..P WKT 2010 05 06 06 34 55 31.3200 -97.3300 251.000 122.0 191.454 2.600 -999.990 -999.990 1.915 ..P WKT 2010 05 06 06 39 55 31.3200 -97.3300 251.000 457.0 157.945 2.450 -999.990 -999.990 1.579 ..P WKT 2010 05 06 06 49 55 31.3200 -97.3300 251.000 30.0 174.548 3.090 -999.990 -999.990 1.745 ..P WKT 2010 05 06 06 54 55 31.3200 -97.3300 251.000 122.0 184.079 3.220 -999.990 -999.990 1.841 ..P WKT 2010 05 06 06 59 55 31.3200 -97.3300 251.000 457.0 150.403 3.000 -999.990 -999.990 1.504 ..P WKT 2010 05 06 07 04 55 31.3200 -97.3300 251.000 30.0 172.714 4.440 -999.990 -999.990 1.727 ..P WKT 2010 05 06 07 09 55 31.3200 -97.3300 251.000 122.0 174.881 2.750 -999.990 -999.990 1.749 ..P WKT 2010 05 06 07 14 55 31.3200 -97.3300 251.000 457.0 157.881 3.550 -999.990 -999.990 1.579 ..P WKT 2010 05 06 07 24 55 31.3200 -97.3300 251.000 30.0 174.635 2.970 -999.990 -999.990 1.746 ..P WKT 2010 05 06 07 29 55 31.3200 -97.3300 251.000 122.0 172.972 2.940 -999.990 -999.990 1.730 ..P WKT 2010 05 06 07 34 55 31.3200 -97.3300 251.000 457.0 150.482 4.270 -999.990 -999.990 1.505 ..P WKT 2010 05 06 07 39 55 31.3200 -97.3300 251.000 30.0 171.868 2.900 -999.990 -999.990 1.719 ..P WKT 2010 05 06 07 44 55 31.3200 -97.3300 251.000 122.0 174.926 4.680 -999.990 -999.990 1.749 ..P WKT 2010 05 06 07 49 55 31.3200 -97.3300 251.000 457.0 154.386 3.340 -999.990 -999.990 1.544 ..P WKT 2010 05 06 07 59 55 31.3200 -97.3300 251.000 30.0 164.568 2.940 -999.990 -999.990 1.646 ..P WKT 2010 05 06 08 04 55 31.3200 -97.3300 251.000 122.0 172.523 3.260 -999.990 -999.990 1.725 ..P WKT 2010 05 06 08 09 55 31.3200 -97.3300 251.000 457.0 156.607 5.310 -999.990 -999.990 1.566 ..P WKT 2010 05 06 08 14 55 31.3200 -97.3300 251.000 30.0 170.944 4.980 -999.990 -999.990 1.709 ..P WKT 2010 05 06 08 19 55 31.3200 -97.3300 251.000 122.0 168.352 3.740 -999.990 -999.990 1.684 ..P WKT 2010 05 06 08 24 55 31.3200 -97.3300 251.000 457.0 158.822 3.810 -999.990 -999.990 1.588 ..P WKT 2010 05 06 08 34 55 31.3200 -97.3300 251.000 30.0 169.691 4.830 -999.990 -999.990 1.697 ..P WKT 2010 05 06 08 39 55 31.3200 -97.3300 251.000 122.0 175.660 4.040 -999.990 -999.990 1.757 ..P WKT 2010 05 06 08 44 55 31.3200 -97.3300 251.000 457.0 156.385 3.280 -999.990 -999.990 1.564 ..P WKT 2010 05 06 08 49 55 31.3200 -97.3300 251.000 30.0 168.455 3.250 -999.990 -999.990 1.685 ..P WKT 2010 05 06 08 54 55 31.3200 -97.3300 251.000 122.0 173.313 4.020 -999.990 -999.990 1.733 ..P WKT 2010 05 06 08 59 55 31.3200 -97.3300 251.000 457.0 156.816 3.110 -999.990 -999.990 1.568 ..P WKT 2010 05 06 09 09 55 31.3200 -97.3300 251.000 30.0 164.372 4.560 -999.990 -999.990 1.644 ..P WKT 2010 05 06 09 14 55 31.3200 -97.3300 251.000 122.0 170.397 3.090 -999.990 -999.990 1.704 ..P WKT 2010 05 06 09 19 55 31.3200 -97.3300 251.000 457.0 164.777 3.900 -999.990 -999.990 1.648 ..P WKT 2010 05 06 09 24 55 31.3200 -97.3300 251.000 30.0 169.138 4.440 -999.990 -999.990 1.691 ..P WKT 2010 05 06 09 29 55 31.3200 -97.3300 251.000 122.0 157.836 4.250 -999.990 -999.990 1.578 ..P WKT 2010 05 06 09 34 55 31.3200 -97.3300 251.000 457.0 152.219 2.790 -999.990 -999.990 1.522 ..P WKT 2010 05 06 09 44 55 31.3200 -97.3300 251.000 30.0 168.223 3.100 -999.990 -999.990 1.682 ..P WKT 2010 05 06 09 49 55 31.3200 -97.3300 251.000 122.0 158.806 3.680 -999.990 -999.990 1.588 ..P WKT 2010 05 06 09 54 55 31.3200 -97.3300 251.000 457.0 160.612 4.070 -999.990 -999.990 1.606 ..P WKT 2010 05 06 09 59 55 31.3200 -97.3300 251.000 30.0 161.863 3.530 -999.990 -999.990 1.619 ..P WKT 2010 05 06 10 04 55 31.3200 -97.3300 251.000 122.0 163.807 3.260 -999.990 -999.990 1.638 ..P WKT 2010 05 06 10 09 55 31.3200 -97.3300 251.000 457.0 162.426 3.110 -999.990 -999.990 1.624 ..P WKT 2010 05 06 10 19 55 31.3200 -97.3300 251.000 30.0 165.245 4.750 -999.990 -999.990 1.652 ..P WKT 2010 05 06 10 24 55 31.3200 -97.3300 251.000 122.0 157.119 3.870 -999.990 -999.990 1.571 ..P WKT 2010 05 06 10 29 55 31.3200 -97.3300 251.000 457.0 159.102 3.270 -999.990 -999.990 1.591 ..P WKT 2010 05 06 10 34 55 31.3200 -97.3300 251.000 30.0 159.700 3.830 -999.990 -999.990 1.597 ..P WKT 2010 05 06 10 39 55 31.3200 -97.3300 251.000 122.0 162.790 4.090 -999.990 -999.990 1.628 ..P WKT 2010 05 06 10 44 55 31.3200 -97.3300 251.000 457.0 160.481 3.880 -999.990 -999.990 1.605 ..P WKT 2010 05 06 10 54 55 31.3200 -97.3300 251.000 30.0 157.920 4.140 -999.990 -999.990 1.579 ..P WKT 2010 05 06 10 59 55 31.3200 -97.3300 251.000 122.0 156.423 5.630 -999.990 -999.990 1.564 ..P WKT 2010 05 06 11 04 55 31.3200 -97.3300 251.000 457.0 160.184 4.330 -999.990 -999.990 1.602 ..P WKT 2010 05 06 11 09 55 31.3200 -97.3300 251.000 30.0 158.686 4.680 -999.990 -999.990 1.587 ..P WKT 2010 05 06 11 14 55 31.3200 -97.3300 251.000 122.0 162.031 4.530 -999.990 -999.990 1.620 ..P WKT 2010 05 06 11 19 55 31.3200 -97.3300 251.000 457.0 161.225 4.360 -999.990 -999.990 1.612 ..P WKT 2010 05 06 11 29 55 31.3200 -97.3300 251.000 30.0 164.549 5.000 -999.990 -999.990 1.645 ..P WKT 2010 05 06 11 34 55 31.3200 -97.3300 251.000 122.0 167.848 4.270 -999.990 -999.990 1.678 ..P WKT 2010 05 06 11 39 55 31.3200 -97.3300 251.000 457.0 154.829 4.720 -999.990 -999.990 1.548 ..P WKT 2010 05 06 11 44 55 31.3200 -97.3300 251.000 30.0 176.933 4.040 -999.990 -999.990 1.769 ..P WKT 2010 05 06 11 49 55 31.3200 -97.3300 251.000 122.0 165.851 3.860 -999.990 -999.990 1.659 ..P WKT 2010 05 06 12 09 55 31.3200 -97.3300 251.000 457.0 149.333 3.950 -999.990 -999.990 1.493 ..P WKT 2010 05 06 12 10 25 31.3200 -97.3300 251.000 457.0 152.101 3.880 -999.990 -999.990 1.521 ..P WKT 2010 05 06 12 10 55 31.3200 -97.3300 251.000 457.0 146.299 3.850 -999.990 -999.990 1.463 ..P WKT 2010 05 06 12 11 25 31.3200 -97.3300 251.000 457.0 148.790 3.610 -999.990 -999.990 1.488 ..P WKT 2010 05 06 12 11 55 31.3200 -97.3300 251.000 457.0 142.712 3.790 -999.990 -999.990 1.427 ..P WKT 2010 05 06 12 12 25 31.3200 -97.3300 251.000 457.0 143.545 4.650 -999.990 -999.990 1.435 ..P WKT 2010 05 06 12 12 55 31.3200 -97.3300 251.000 457.0 146.865 3.540 -999.990 -999.990 1.469 ..P WKT 2010 05 06 12 13 25 31.3200 -97.3300 251.000 457.0 151.291 3.960 -999.990 -999.990 1.513 ..P WKT 2010 05 06 12 13 55 31.3200 -97.3300 251.000 457.0 151.570 3.680 -999.990 -999.990 1.516 ..P WKT 2010 05 06 12 14 25 31.3200 -97.3300 251.000 457.0 149.639 4.110 -999.990 -999.990 1.496 ..P WKT 2010 05 06 12 14 55 31.3200 -97.3300 251.000 457.0 151.025 4.020 -999.990 -999.990 1.510 ..P WKT 2010 05 06 12 19 55 31.3200 -97.3300 251.000 30.0 172.064 3.430 -999.990 -999.990 1.721 ..P WKT 2010 05 06 12 24 55 31.3200 -97.3300 251.000 122.0 168.226 3.760 -999.990 -999.990 1.682 ..P WKT 2010 05 06 12 29 55 31.3200 -97.3300 251.000 457.0 154.716 4.380 -999.990 -999.990 1.547 ..P WKT 2010 05 06 12 34 55 31.3200 -97.3300 251.000 30.0 166.909 4.950 -999.990 -999.990 1.669 ..P WKT 2010 05 06 12 39 55 31.3200 -97.3300 251.000 122.0 170.257 4.930 -999.990 -999.990 1.703 ..P WKT 2010 05 06 12 44 55 31.3200 -97.3300 251.000 457.0 143.483 3.230 -999.990 -999.990 1.435 ..P WKT 2010 05 06 12 54 55 31.3200 -97.3300 251.000 30.0 168.822 5.290 -999.990 -999.990 1.688 ..P WKT 2010 05 06 12 59 55 31.3200 -97.3300 251.000 122.0 171.745 3.270 -999.990 -999.990 1.717 ..P WKT 2010 05 06 13 04 55 31.3200 -97.3300 251.000 457.0 148.419 3.490 -999.990 -999.990 1.484 ..P WKT 2010 05 06 13 09 55 31.3200 -97.3300 251.000 30.0 169.576 4.110 -999.990 -999.990 1.696 ..P WKT 2010 05 06 13 14 55 31.3200 -97.3300 251.000 122.0 171.116 3.520 -999.990 -999.990 1.711 ..P WKT 2010 05 06 13 19 55 31.3200 -97.3300 251.000 457.0 143.374 3.860 -999.990 -999.990 1.434 ..P WKT 2010 05 06 13 29 55 31.3200 -97.3300 251.000 30.0 166.484 3.800 -999.990 -999.990 1.665 ..P WKT 2010 05 06 13 34 55 31.3200 -97.3300 251.000 122.0 166.505 3.690 -999.990 -999.990 1.665 ..P WKT 2010 05 06 13 39 55 31.3200 -97.3300 251.000 457.0 146.363 3.840 -999.990 -999.990 1.464 ..P WKT 2010 05 06 13 44 55 31.3200 -97.3300 251.000 30.0 160.886 4.020 -999.990 -999.990 1.609 ..P WKT 2010 05 06 13 49 55 31.3200 -97.3300 251.000 122.0 162.426 3.640 -999.990 -999.990 1.624 ..P WKT 2010 05 06 13 54 55 31.3200 -97.3300 251.000 457.0 140.906 4.400 -999.990 -999.990 1.409 ..P WKT 2010 05 06 14 04 55 31.3200 -97.3300 251.000 30.0 156.770 3.720 -999.990 -999.990 1.568 ..P WKT 2010 05 06 14 09 55 31.3200 -97.3300 251.000 122.0 158.389 3.940 -999.990 -999.990 1.584 ..P WKT 2010 05 06 14 14 55 31.3200 -97.3300 251.000 457.0 142.750 4.230 -999.990 -999.990 1.427 ..P WKT 2010 05 06 14 19 55 31.3200 -97.3300 251.000 30.0 158.866 4.860 -999.990 -999.990 1.589 ..P WKT 2010 05 06 14 24 55 31.3200 -97.3300 251.000 122.0 158.138 5.280 -999.990 -999.990 1.581 ..P WKT 2010 05 06 14 29 55 31.3200 -97.3300 251.000 457.0 144.020 6.050 -999.990 -999.990 1.440 ..P WKT 2010 05 06 14 39 55 31.3200 -97.3300 251.000 30.0 158.834 5.780 -999.990 -999.990 1.588 ..P WKT 2010 05 06 14 44 55 31.3200 -97.3300 251.000 122.0 160.433 5.290 -999.990 -999.990 1.604 ..P WKT 2010 05 06 14 49 55 31.3200 -97.3300 251.000 457.0 141.743 5.120 -999.990 -999.990 1.417 ..P WKT 2010 05 06 14 54 55 31.3200 -97.3300 251.000 30.0 151.761 4.430 -999.990 -999.990 1.518 ..P WKT 2010 05 06 14 59 55 31.3200 -97.3300 251.000 122.0 156.948 4.040 -999.990 -999.990 1.569 ..P WKT 2010 05 06 15 04 55 31.3200 -97.3300 251.000 457.0 140.882 4.050 -999.990 -999.990 1.409 ..P WKT 2010 05 06 15 14 55 31.3200 -97.3300 251.000 30.0 151.276 3.460 -999.990 -999.990 1.513 ..P WKT 2010 05 06 15 19 55 31.3200 -97.3300 251.000 122.0 159.104 3.580 -999.990 -999.990 1.591 ..P WKT 2010 05 06 15 24 55 31.3200 -97.3300 251.000 457.0 142.371 3.030 -999.990 -999.990 1.424 ..P WKT 2010 05 06 15 29 55 31.3200 -97.3300 251.000 30.0 155.994 3.600 -999.990 -999.990 1.560 ..P WKT 2010 05 06 15 34 55 31.3200 -97.3300 251.000 122.0 159.130 4.070 -999.990 -999.990 1.591 ..P WKT 2010 05 06 15 39 55 31.3200 -97.3300 251.000 457.0 137.156 4.810 -999.990 -999.990 1.372 ..P WKT 2010 05 06 15 49 55 31.3200 -97.3300 251.000 30.0 161.026 4.530 -999.990 -999.990 1.610 ..P WKT 2010 05 06 15 54 55 31.3200 -97.3300 251.000 122.0 162.171 3.590 -999.990 -999.990 1.622 ..P WKT 2010 05 06 15 59 55 31.3200 -97.3300 251.000 457.0 149.798 3.970 -999.990 -999.990 1.498 ..P WKT 2010 05 06 16 04 55 31.3200 -97.3300 251.000 30.0 155.908 4.470 -999.990 -999.990 1.559 ..P WKT 2010 05 06 16 09 55 31.3200 -97.3300 251.000 122.0 162.294 4.010 -999.990 -999.990 1.623 ..P WKT 2010 05 06 16 14 55 31.3200 -97.3300 251.000 457.0 158.198 3.660 -999.990 -999.990 1.582 ..P WKT 2010 05 06 16 24 55 31.3200 -97.3300 251.000 30.0 161.905 4.000 -999.990 -999.990 1.619 ..P WKT 2010 05 06 16 29 55 31.3200 -97.3300 251.000 122.0 160.882 4.100 -999.990 -999.990 1.609 ..P WKT 2010 05 06 16 34 55 31.3200 -97.3300 251.000 457.0 159.859 4.370 -999.990 -999.990 1.599 ..P WKT 2010 05 06 16 39 55 31.3200 -97.3300 251.000 30.0 150.288 4.340 -999.990 -999.990 1.503 ..P WKT 2010 05 06 16 44 55 31.3200 -97.3300 251.000 122.0 155.885 4.040 -999.990 -999.990 1.559 ..P WKT 2010 05 06 16 49 55 31.3200 -97.3300 251.000 457.0 150.174 4.330 -999.990 -999.990 1.502 ..P WKT 2010 05 06 17 04 55 31.3200 -97.3300 251.000 30.0 150.846 3.650 -999.990 -999.990 1.508 ..P WKT 2010 05 06 17 09 55 31.3200 -97.3300 251.000 122.0 154.173 4.150 -999.990 -999.990 1.542 ..P WKT 2010 05 06 17 14 55 31.3200 -97.3300 251.000 457.0 150.747 4.600 -999.990 -999.990 1.507 ..P WKT 2010 05 06 17 19 55 31.3200 -97.3300 251.000 30.0 156.555 4.070 -999.990 -999.990 1.566 ..P WKT 2010 05 06 17 24 55 31.3200 -97.3300 251.000 122.0 154.507 5.300 -999.990 -999.990 1.545 ..P WKT 2010 05 06 17 29 55 31.3200 -97.3300 251.000 457.0 149.013 4.050 -999.990 -999.990 1.490 ..P WKT 2010 05 06 17 39 55 31.3200 -97.3300 251.000 30.0 153.602 4.350 -999.990 -999.990 1.536 ..P WKT 2010 05 06 17 44 55 31.3200 -97.3300 251.000 122.0 155.829 4.470 -999.990 -999.990 1.558 ..P WKT 2010 05 06 17 49 55 31.3200 -97.3300 251.000 457.0 160.949 4.030 -999.990 -999.990 1.609 ..P WKT 2010 05 06 17 54 55 31.3200 -97.3300 251.000 30.0 155.045 3.840 -999.990 -999.990 1.550 ..P WKT 2010 05 06 17 59 55 31.3200 -97.3300 251.000 122.0 162.645 4.200 -999.990 -999.990 1.626 ..P WKT 2010 05 06 18 04 55 31.3200 -97.3300 251.000 457.0 159.360 4.450 -999.990 -999.990 1.594 ..P WKT 2010 05 06 18 14 55 31.3200 -97.3300 251.000 30.0 156.766 4.350 -999.990 -999.990 1.568 ..P WKT 2010 05 06 18 19 55 31.3200 -97.3300 251.000 122.0 162.692 5.530 -999.990 -999.990 1.627 ..P WKT 2010 05 06 18 24 55 31.3200 -97.3300 251.000 457.0 154.152 3.560 -999.990 -999.990 1.542 ..P WKT 2010 05 06 18 29 55 31.3200 -97.3300 251.000 30.0 151.261 3.690 -999.990 -999.990 1.513 ..P WKT 2010 05 06 18 34 55 31.3200 -97.3300 251.000 122.0 153.329 3.560 -999.990 -999.990 1.533 ..P WKT 2010 05 06 18 39 55 31.3200 -97.3300 251.000 457.0 148.097 3.410 -999.990 -999.990 1.481 ..P WKT 2010 05 06 18 49 55 31.3200 -97.3300 251.000 30.0 151.761 3.740 -999.990 -999.990 1.518 ..P WKT 2010 05 06 18 54 55 31.3200 -97.3300 251.000 122.0 154.046 3.670 -999.990 -999.990 1.540 ..P WKT 2010 05 06 18 59 55 31.3200 -97.3300 251.000 457.0 154.815 4.120 -999.990 -999.990 1.548 ..P WKT 2010 05 06 19 04 55 31.3200 -97.3300 251.000 30.0 154.345 3.880 -999.990 -999.990 1.543 ..P WKT 2010 05 06 19 09 55 31.3200 -97.3300 251.000 122.0 158.694 4.690 -999.990 -999.990 1.587 ..P WKT 2010 05 06 19 14 55 31.3200 -97.3300 251.000 457.0 151.614 4.630 -999.990 -999.990 1.516 ..P WKT 2010 05 06 19 24 55 31.3200 -97.3300 251.000 30.0 152.248 5.270 -999.990 -999.990 1.522 ..P WKT 2010 05 06 19 29 55 31.3200 -97.3300 251.000 122.0 151.975 5.050 -999.990 -999.990 1.520 ..P WKT 2010 05 06 19 34 55 31.3200 -97.3300 251.000 457.0 151.426 4.330 -999.990 -999.990 1.514 ..P WKT 2010 05 06 19 39 55 31.3200 -97.3300 251.000 30.0 149.500 3.670 -999.990 -999.990 1.495 ..P WKT 2010 05 06 19 44 55 31.3200 -97.3300 251.000 122.0 155.560 3.450 -999.990 -999.990 1.556 ..P WKT 2010 05 06 19 49 55 31.3200 -97.3300 251.000 457.0 154.461 3.300 -999.990 -999.990 1.545 ..P WKT 2010 05 06 19 59 55 31.3200 -97.3300 251.000 30.0 152.144 3.640 -999.990 -999.990 1.521 ..P WKT 2010 05 06 20 04 55 31.3200 -97.3300 251.000 122.0 152.854 3.750 -999.990 -999.990 1.529 ..P WKT 2010 05 06 20 09 55 31.3200 -97.3300 251.000 457.0 153.565 5.890 -999.990 -999.990 1.536 ..P WKT 2010 05 06 20 14 55 31.3200 -97.3300 251.000 30.0 146.842 6.570 -999.990 -999.990 1.468 ..P WKT 2010 05 06 20 19 55 31.3200 -97.3300 251.000 122.0 157.737 5.900 -999.990 -999.990 1.577 ..P WKT 2010 05 06 20 24 55 31.3200 -97.3300 251.000 457.0 155.418 4.390 -999.990 -999.990 1.554 ..P WKT 2010 05 06 20 34 55 31.3200 -97.3300 251.000 30.0 153.574 5.360 -999.990 -999.990 1.536 ..P WKT 2010 05 06 20 39 55 31.3200 -97.3300 251.000 122.0 160.103 5.680 -999.990 -999.990 1.601 ..P WKT 2010 05 06 20 44 55 31.3200 -97.3300 251.000 457.0 157.273 6.990 -999.990 -999.990 1.573 ..P WKT 2010 05 06 20 49 55 31.3200 -97.3300 251.000 30.0 154.720 7.590 -999.990 -999.990 1.547 ..P WKT 2010 05 06 20 54 55 31.3200 -97.3300 251.000 122.0 159.597 7.250 -999.990 -999.990 1.596 ..P WKT 2010 05 06 20 59 55 31.3200 -97.3300 251.000 457.0 156.218 4.370 -999.990 -999.990 1.562 ..P WKT 2010 05 06 21 09 55 31.3200 -97.3300 251.000 30.0 152.448 6.010 -999.990 -999.990 1.524 ..P WKT 2010 05 06 21 14 55 31.3200 -97.3300 251.000 122.0 156.185 6.790 -999.990 -999.990 1.562 ..P WKT 2010 05 06 21 19 55 31.3200 -97.3300 251.000 457.0 163.083 7.590 -999.990 -999.990 1.631 ..P WKT 2010 05 06 21 24 55 31.3200 -97.3300 251.000 30.0 159.941 6.660 -999.990 -999.990 1.599 ..P WKT 2010 05 06 21 29 55 31.3200 -97.3300 251.000 122.0 164.914 6.350 -999.990 -999.990 1.649 ..P WKT 2010 05 06 21 34 55 31.3200 -97.3300 251.000 457.0 158.472 5.700 -999.990 -999.990 1.585 ..P WKT 2010 05 06 21 44 55 31.3200 -97.3300 251.000 30.0 155.666 3.970 -999.990 -999.990 1.557 ..P WKT 2010 05 06 21 49 55 31.3200 -97.3300 251.000 122.0 161.365 5.760 -999.990 -999.990 1.614 ..P WKT 2010 05 06 21 54 55 31.3200 -97.3300 251.000 457.0 149.599 6.650 -999.990 -999.990 1.496 ..P WKT 2010 05 06 21 59 55 31.3200 -97.3300 251.000 30.0 150.898 5.360 -999.990 -999.990 1.509 ..P WKT 2010 05 06 22 04 55 31.3200 -97.3300 251.000 122.0 154.809 5.690 -999.990 -999.990 1.548 ..P WKT 2010 05 06 22 09 55 31.3200 -97.3300 251.000 457.0 154.045 3.900 -999.990 -999.990 1.540 ..P WKT 2010 05 06 22 19 55 31.3200 -97.3300 251.000 30.0 159.233 3.510 -999.990 -999.990 1.592 ..P WKT 2010 05 06 22 24 55 31.3200 -97.3300 251.000 122.0 160.925 5.150 -999.990 -999.990 1.609 ..P WKT 2010 05 06 22 29 55 31.3200 -97.3300 251.000 457.0 159.453 5.320 -999.990 -999.990 1.595 ..P WKT 2010 05 06 22 34 55 31.3200 -97.3300 251.000 30.0 156.745 5.050 -999.990 -999.990 1.567 ..P WKT 2010 05 06 22 39 55 31.3200 -97.3300 251.000 122.0 160.223 5.160 -999.990 -999.990 1.602 ..P WKT 2010 05 06 22 44 55 31.3200 -97.3300 251.000 457.0 157.652 3.270 -999.990 -999.990 1.577 ..P WKT 2010 05 06 22 54 55 31.3200 -97.3300 251.000 30.0 160.051 3.410 -999.990 -999.990 1.601 ..P WKT 2010 05 06 22 59 55 31.3200 -97.3300 251.000 122.0 164.195 4.580 -999.990 -999.990 1.642 ..P WKT 2010 05 06 23 04 55 31.3200 -97.3300 251.000 457.0 155.833 5.770 -999.990 -999.990 1.558 ..P WKT 2010 05 06 23 09 55 31.3200 -97.3300 251.000 30.0 169.185 5.640 -999.990 -999.990 1.692 ..P WKT 2010 05 06 23 14 55 31.3200 -97.3300 251.000 122.0 177.313 4.840 -999.990 -999.990 1.773 ..P WKT 2010 05 06 23 19 55 31.3200 -97.3300 251.000 457.0 171.837 3.460 -999.990 -999.990 1.718 ..P WKT 2010 05 06 23 29 55 31.3200 -97.3300 251.000 30.0 164.887 3.250 -999.990 -999.990 1.649 ..P WKT 2010 05 06 23 34 55 31.3200 -97.3300 251.000 122.0 174.402 4.380 -999.990 -999.990 1.744 ..P WKT 2010 05 06 23 39 55 31.3200 -97.3300 251.000 457.0 162.760 5.110 -999.990 -999.990 1.628 ..P WKT 2010 05 06 23 44 55 31.3200 -97.3300 251.000 30.0 164.307 5.560 -999.990 -999.990 1.643 ..P WKT 2010 05 06 23 49 55 31.3200 -97.3300 251.000 122.0 166.953 3.550 -999.990 -999.990 1.670 ..P WKT 2010 05 07 00 09 55 31.3200 -97.3300 251.000 457.0 169.731 4.270 -999.990 -999.990 1.697 ..P WKT 2010 05 07 00 10 25 31.3200 -97.3300 251.000 457.0 168.775 4.240 -999.990 -999.990 1.688 ..P WKT 2010 05 07 00 10 55 31.3200 -97.3300 251.000 457.0 162.597 2.970 -999.990 -999.990 1.626 ..P WKT 2010 05 07 00 11 25 31.3200 -97.3300 251.000 457.0 161.641 2.930 -999.990 -999.990 1.616 ..P WKT 2010 05 07 00 11 55 31.3200 -97.3300 251.000 457.0 160.958 3.740 -999.990 -999.990 1.610 ..P WKT 2010 05 07 00 12 25 31.3200 -97.3300 251.000 457.0 160.276 5.060 -999.990 -999.990 1.603 ..P WKT 2010 05 07 00 12 55 31.3200 -97.3300 251.000 457.0 165.363 3.920 -999.990 -999.990 1.654 ..P WKT 2010 05 07 00 13 25 31.3200 -97.3300 251.000 457.0 163.307 3.150 -999.990 -999.990 1.633 ..P WKT 2010 05 07 00 13 55 31.3200 -97.3300 251.000 457.0 161.526 3.320 -999.990 -999.990 1.615 ..P WKT 2010 05 07 00 14 25 31.3200 -97.3300 251.000 457.0 160.844 2.790 -999.990 -999.990 1.608 ..P WKT 2010 05 07 00 14 55 31.3200 -97.3300 251.000 457.0 159.887 3.280 -999.990 -999.990 1.599 ..P WKT 2010 05 07 00 19 55 31.3200 -97.3300 251.000 30.0 163.230 3.660 -999.990 -999.990 1.632 ..P WKT 2010 05 07 00 24 55 31.3200 -97.3300 251.000 122.0 163.825 4.170 -999.990 -999.990 1.638 ..P WKT 2010 05 07 00 29 55 31.3200 -97.3300 251.000 457.0 159.474 3.400 -999.990 -999.990 1.595 ..P WKT 2010 05 07 00 34 55 31.3200 -97.3300 251.000 30.0 166.665 4.040 -999.990 -999.990 1.667 ..P WKT 2010 05 07 00 39 55 31.3200 -97.3300 251.000 122.0 171.934 2.990 -999.990 -999.990 1.719 ..P WKT 2010 05 07 00 44 55 31.3200 -97.3300 251.000 457.0 158.787 2.710 -999.990 -999.990 1.588 ..P WKT 2010 05 07 00 54 55 31.3200 -97.3300 251.000 30.0 170.452 4.240 -999.990 -999.990 1.705 ..P WKT 2010 05 07 00 59 55 31.3200 -97.3300 251.000 122.0 166.403 3.240 -999.990 -999.990 1.664 ..P WKT 2010 05 07 01 04 55 31.3200 -97.3300 251.000 457.0 156.580 3.760 -999.990 -999.990 1.566 ..P WKT 2010 05 07 01 09 55 31.3200 -97.3300 251.000 30.0 162.153 3.710 -999.990 -999.990 1.622 ..P WKT 2010 05 07 01 14 55 31.3200 -97.3300 251.000 122.0 161.540 3.150 -999.990 -999.990 1.615 ..P WKT 2010 05 07 01 19 55 31.3200 -97.3300 251.000 457.0 161.752 3.880 -999.990 -999.990 1.618 ..P WKT 2010 05 07 01 29 55 31.3200 -97.3300 251.000 30.0 155.065 4.290 -999.990 -999.990 1.551 ..P WKT 2010 05 07 01 34 55 31.3200 -97.3300 251.000 122.0 155.728 3.590 -999.990 -999.990 1.557 ..P WKT 2010 05 07 01 39 55 31.3200 -97.3300 251.000 457.0 156.803 4.540 -999.990 -999.990 1.568 ..P WKT 2010 05 07 01 44 55 31.3200 -97.3300 251.000 30.0 155.817 4.270 -999.990 -999.990 1.558 ..P WKT 2010 05 07 01 49 55 31.3200 -97.3300 251.000 122.0 156.205 4.710 -999.990 -999.990 1.562 ..P WKT 2010 05 07 01 54 55 31.3200 -97.3300 251.000 457.0 154.531 5.290 -999.990 -999.990 1.545 ..P WKT 2010 05 07 02 04 55 31.3200 -97.3300 251.000 30.0 150.099 5.110 -999.990 -999.990 1.501 ..P WKT 2010 05 07 02 09 55 31.3200 -97.3300 251.000 122.0 159.862 5.110 -999.990 -999.990 1.599 ..P WKT 2010 05 07 02 14 55 31.3200 -97.3300 251.000 457.0 146.650 4.580 -999.990 -999.990 1.467 ..P WKT 2010 05 07 02 19 55 31.3200 -97.3300 251.000 30.0 156.138 4.580 -999.990 -999.990 1.561 ..P WKT 2010 05 07 02 24 55 31.3200 -97.3300 251.000 122.0 161.637 3.990 -999.990 -999.990 1.616 ..P WKT 2010 05 07 02 29 55 31.3200 -97.3300 251.000 457.0 148.422 3.970 -999.990 -999.990 1.484 ..P WKT 2010 05 07 02 39 55 31.3200 -97.3300 251.000 30.0 163.079 4.490 -999.990 -999.990 1.631 ..P WKT 2010 05 07 02 44 55 31.3200 -97.3300 251.000 122.0 159.712 3.370 -999.990 -999.990 1.597 ..P WKT 2010 05 07 02 49 55 31.3200 -97.3300 251.000 457.0 153.593 3.280 -999.990 -999.990 1.536 ..P WKT 2010 05 07 02 54 55 31.3200 -97.3300 251.000 30.0 161.375 3.170 -999.990 -999.990 1.614 ..P WKT 2010 05 07 02 59 55 31.3200 -97.3300 251.000 122.0 164.891 3.080 -999.990 -999.990 1.649 ..P WKT 2010 05 07 03 04 55 31.3200 -97.3300 251.000 457.0 158.358 2.980 -999.990 -999.990 1.584 ..P WKT 2010 05 07 03 14 55 31.3200 -97.3300 251.000 30.0 159.391 3.570 -999.990 -999.990 1.594 ..P WKT 2010 05 07 03 19 55 31.3200 -97.3300 251.000 122.0 159.250 3.250 -999.990 -999.990 1.593 ..P WKT 2010 05 07 03 24 55 31.3200 -97.3300 251.000 457.0 163.238 3.890 -999.990 -999.990 1.632 ..P WKT 2010 05 07 03 29 55 31.3200 -97.3300 251.000 30.0 158.414 3.710 -999.990 -999.990 1.584 ..P WKT 2010 05 07 03 34 55 31.3200 -97.3300 251.000 122.0 159.924 5.220 -999.990 -999.990 1.599 ..P WKT 2010 05 07 03 39 55 31.3200 -97.3300 251.000 457.0 157.028 4.230 -999.990 -999.990 1.570 ..P WKT 2010 05 07 03 49 55 31.3200 -97.3300 251.000 30.0 154.736 4.250 -999.990 -999.990 1.547 ..P WKT 2010 05 07 03 54 55 31.3200 -97.3300 251.000 122.0 156.995 4.260 -999.990 -999.990 1.570 ..P WKT 2010 05 07 03 59 55 31.3200 -97.3300 251.000 457.0 155.672 4.300 -999.990 -999.990 1.557 ..P WKT 2010 05 07 04 04 55 31.3200 -97.3300 251.000 30.0 151.869 3.310 -999.990 -999.990 1.519 ..P WKT 2010 05 07 04 09 55 31.3200 -97.3300 251.000 122.0 158.260 2.950 -999.990 -999.990 1.583 ..P WKT 2010 05 07 04 14 55 31.3200 -97.3300 251.000 457.0 156.662 3.170 -999.990 -999.990 1.567 ..P WKT 2010 05 07 04 24 55 31.3200 -97.3300 251.000 30.0 150.352 3.690 -999.990 -999.990 1.504 ..P WKT 2010 05 07 04 29 55 31.3200 -97.3300 251.000 122.0 153.360 2.690 -999.990 -999.990 1.534 ..P WKT 2010 05 07 04 34 55 31.3200 -97.3300 251.000 457.0 142.035 3.120 -999.990 -999.990 1.420 ..P WKT 2010 05 07 04 39 55 31.3200 -97.3300 251.000 30.0 151.105 3.170 -999.990 -999.990 1.511 ..P WKT 2010 05 07 04 44 55 31.3200 -97.3300 251.000 122.0 161.832 2.950 -999.990 -999.990 1.618 ..P WKT 2010 05 07 04 49 55 31.3200 -97.3300 251.000 457.0 154.089 4.380 -999.990 -999.990 1.541 ..P WKT 2010 05 07 05 04 55 31.3200 -97.3300 251.000 30.0 152.681 3.230 -999.990 -999.990 1.527 ..P WKT 2010 05 07 05 09 55 31.3200 -97.3300 251.000 122.0 157.366 3.080 -999.990 -999.990 1.574 ..P WKT 2010 05 07 05 14 55 31.3200 -97.3300 251.000 457.0 158.329 4.650 -999.990 -999.990 1.583 ..P WKT 2010 05 07 05 19 55 31.3200 -97.3300 251.000 30.0 149.226 3.320 -999.990 -999.990 1.492 ..P WKT 2010 05 07 05 24 55 31.3200 -97.3300 251.000 122.0 159.428 3.930 -999.990 -999.990 1.594 ..P WKT 2010 05 07 05 29 55 31.3200 -97.3300 251.000 457.0 145.773 3.560 -999.990 -999.990 1.458 ..P WKT 2010 05 07 05 39 55 31.3200 -97.3300 251.000 30.0 147.420 3.650 -999.990 -999.990 1.474 ..P WKT 2010 05 07 05 44 55 31.3200 -97.3300 251.000 122.0 157.760 3.740 -999.990 -999.990 1.578 ..P WKT 2010 05 07 05 49 55 31.3200 -97.3300 251.000 457.0 151.135 3.440 -999.990 -999.990 1.511 ..P WKT 2010 05 07 05 54 55 31.3200 -97.3300 251.000 30.0 153.199 4.850 -999.990 -999.990 1.532 ..P WKT 2010 05 07 05 59 55 31.3200 -97.3300 251.000 122.0 156.229 3.780 -999.990 -999.990 1.562 ..P WKT 2010 05 07 06 04 55 31.3200 -97.3300 251.000 457.0 155.673 3.680 -999.990 -999.990 1.557 ..P WKT 2010 05 07 06 14 55 31.3200 -97.3300 251.000 30.0 156.432 4.590 -999.990 -999.990 1.564 ..P WKT 2010 05 07 06 19 55 31.3200 -97.3300 251.000 122.0 162.992 3.720 -999.990 -999.990 1.630 ..P WKT 2010 05 07 06 24 55 31.3200 -97.3300 251.000 457.0 154.649 3.980 -999.990 -999.990 1.546 ..P WKT 2010 05 07 06 29 55 31.3200 -97.3300 251.000 30.0 161.348 3.460 -999.990 -999.990 1.613 ..P WKT 2010 05 07 06 34 55 31.3200 -97.3300 251.000 122.0 164.044 3.780 -999.990 -999.990 1.640 ..P WKT 2010 05 07 06 39 55 31.3200 -97.3300 251.000 457.0 153.215 4.350 -999.990 -999.990 1.532 ..P WKT 2010 05 07 06 49 55 31.3200 -97.3300 251.000 30.0 161.961 3.580 -999.990 -999.990 1.620 ..P WKT 2010 05 07 06 54 55 31.3200 -97.3300 251.000 122.0 158.762 6.030 -999.990 -999.990 1.588 ..P WKT 2010 05 07 06 59 55 31.3200 -97.3300 251.000 457.0 138.442 3.250 -999.990 -999.990 1.384 ..P WKT 2010 05 07 07 04 55 31.3200 -97.3300 251.000 30.0 155.400 4.210 -999.990 -999.990 1.554 ..P WKT 2010 05 07 07 09 55 31.3200 -97.3300 251.000 122.0 155.928 3.790 -999.990 -999.990 1.559 ..P WKT 2010 05 07 07 14 55 31.3200 -97.3300 251.000 457.0 139.885 2.520 -999.990 -999.990 1.399 ..P WKT 2010 05 07 07 24 55 31.3200 -97.3300 251.000 30.0 151.790 2.370 -999.990 -999.990 1.518 ..P WKT 2010 05 07 07 29 55 31.3200 -97.3300 251.000 122.0 164.827 3.940 -999.990 -999.990 1.648 ..P WKT 2010 05 07 07 34 55 31.3200 -97.3300 251.000 457.0 162.672 4.000 -999.990 -999.990 1.627 ..P WKT 2010 05 07 07 39 55 31.3200 -97.3300 251.000 30.0 151.400 5.640 -999.990 -999.990 1.514 ..P WKT 2010 05 07 07 44 55 31.3200 -97.3300 251.000 122.0 160.296 5.240 -999.990 -999.990 1.603 ..P WKT 2010 05 07 07 49 55 31.3200 -97.3300 251.000 457.0 163.114 3.420 -999.990 -999.990 1.631 ..P WKT 2010 05 07 07 59 55 31.3200 -97.3300 251.000 30.0 148.697 4.310 -999.990 -999.990 1.487 ..P WKT 2010 05 07 08 04 55 31.3200 -97.3300 251.000 122.0 158.265 5.680 -999.990 -999.990 1.583 ..P WKT 2010 05 07 08 09 55 31.3200 -97.3300 251.000 457.0 158.162 5.490 -999.990 -999.990 1.582 ..P WKT 2010 05 07 08 14 55 31.3200 -97.3300 251.000 30.0 156.399 6.260 -999.990 -999.990 1.564 ..P WKT 2010 05 07 08 19 55 31.3200 -97.3300 251.000 122.0 153.256 5.100 -999.990 -999.990 1.533 ..P WKT 2010 05 07 08 24 55 31.3200 -97.3300 251.000 457.0 150.941 3.590 -999.990 -999.990 1.509 ..P WKT 2010 05 07 08 34 55 31.3200 -97.3300 251.000 30.0 150.398 3.220 -999.990 -999.990 1.504 ..P WKT 2010 05 07 08 39 55 31.3200 -97.3300 251.000 122.0 148.853 4.900 -999.990 -999.990 1.489 ..P WKT 2010 05 07 08 44 55 31.3200 -97.3300 251.000 457.0 149.795 5.420 -999.990 -999.990 1.498 ..P WKT 2010 05 07 08 49 55 31.3200 -97.3300 251.000 30.0 147.145 3.990 -999.990 -999.990 1.471 ..P WKT 2010 05 07 08 54 55 31.3200 -97.3300 251.000 122.0 150.575 3.930 -999.990 -999.990 1.506 ..P WKT 2010 05 07 08 59 55 31.3200 -97.3300 251.000 457.0 160.368 3.350 -999.990 -999.990 1.604 ..P WKT 2010 05 07 09 09 55 31.3200 -97.3300 251.000 30.0 152.338 3.010 -999.990 -999.990 1.523 ..P WKT 2010 05 07 09 14 55 31.3200 -97.3300 251.000 122.0 151.800 2.900 -999.990 -999.990 1.518 ..P WKT 2010 05 07 09 19 55 31.3200 -97.3300 251.000 457.0 157.485 2.590 -999.990 -999.990 1.575 ..P WKT 2010 05 07 09 24 55 31.3200 -97.3300 251.000 30.0 151.138 3.680 -999.990 -999.990 1.511 ..P WKT 2010 05 07 09 29 55 31.3200 -97.3300 251.000 122.0 155.855 2.200 -999.990 -999.990 1.559 ..P WKT 2010 05 07 09 34 55 31.3200 -97.3300 251.000 457.0 156.562 4.350 -999.990 -999.990 1.566 ..P WKT 2010 05 07 09 44 55 31.3200 -97.3300 251.000 30.0 154.241 3.120 -999.990 -999.990 1.542 ..P WKT 2010 05 07 09 49 55 31.3200 -97.3300 251.000 122.0 157.576 2.650 -999.990 -999.990 1.576 ..P WKT 2010 05 07 09 54 55 31.3200 -97.3300 251.000 457.0 149.290 2.420 -999.990 -999.990 1.493 ..P WKT 2010 05 07 09 59 55 31.3200 -97.3300 251.000 30.0 149.858 2.790 -999.990 -999.990 1.499 ..P WKT 2010 05 07 10 04 55 31.3200 -97.3300 251.000 122.0 155.270 3.970 -999.990 -999.990 1.553 ..P WKT 2010 05 07 10 09 55 31.3200 -97.3300 251.000 457.0 147.950 5.270 -999.990 -999.990 1.479 ..P WKT 2010 05 07 10 19 55 31.3200 -97.3300 251.000 30.0 158.696 3.460 -999.990 -999.990 1.587 ..P WKT 2010 05 07 10 24 55 31.3200 -97.3300 251.000 122.0 158.909 3.200 -999.990 -999.990 1.589 ..P WKT 2010 05 07 10 29 55 31.3200 -97.3300 251.000 457.0 151.647 3.090 -999.990 -999.990 1.516 ..P WKT 2010 05 07 10 34 55 31.3200 -97.3300 251.000 30.0 156.981 3.780 -999.990 -999.990 1.570 ..P WKT 2010 05 07 10 39 55 31.3200 -97.3300 251.000 122.0 158.440 3.310 -999.990 -999.990 1.584 ..P WKT 2010 05 07 10 44 55 31.3200 -97.3300 251.000 457.0 148.132 3.500 -999.990 -999.990 1.481 ..P WKT 2010 05 07 10 54 55 31.3200 -97.3300 251.000 30.0 155.617 3.130 -999.990 -999.990 1.556 ..P WKT 2010 05 07 10 59 55 31.3200 -97.3300 251.000 122.0 159.985 2.390 -999.990 -999.990 1.600 ..P WKT 2010 05 07 11 04 55 31.3200 -97.3300 251.000 457.0 149.397 2.050 -999.990 -999.990 1.494 ..P WKT 2010 05 07 11 09 55 31.3200 -97.3300 251.000 30.0 155.564 4.030 -999.990 -999.990 1.556 ..P WKT 2010 05 07 11 14 55 31.3200 -97.3300 251.000 122.0 158.962 2.790 -999.990 -999.990 1.590 ..P WKT 2010 05 07 11 19 55 31.3200 -97.3300 251.000 457.0 146.295 2.430 -999.990 -999.990 1.463 ..P WKT 2010 05 07 11 29 55 31.3200 -97.3300 251.000 30.0 157.534 1.940 -999.990 -999.990 1.575 ..P WKT 2010 05 07 11 34 55 31.3200 -97.3300 251.000 122.0 156.510 3.040 -999.990 -999.990 1.565 ..P WKT 2010 05 07 11 39 55 31.3200 -97.3300 251.000 457.0 157.426 2.250 -999.990 -999.990 1.574 ..P WKT 2010 05 07 11 44 55 31.3200 -97.3300 251.000 30.0 157.511 3.640 -999.990 -999.990 1.575 ..P WKT 2010 05 07 11 49 55 31.3200 -97.3300 251.000 122.0 155.378 2.320 -999.990 -999.990 1.554 ..P WKT 2010 05 07 12 09 55 31.3200 -97.3300 251.000 457.0 149.164 3.120 -999.990 -999.990 1.492 ..P WKT 2010 05 07 12 10 25 31.3200 -97.3300 251.000 457.0 149.932 2.630 -999.990 -999.990 1.499 ..P WKT 2010 05 07 12 10 55 31.3200 -97.3300 251.000 457.0 152.085 3.290 -999.990 -999.990 1.521 ..P WKT 2010 05 07 12 11 25 31.3200 -97.3300 251.000 457.0 153.407 2.670 -999.990 -999.990 1.534 ..P WKT 2010 05 07 12 11 55 31.3200 -97.3300 251.000 457.0 155.006 2.580 -999.990 -999.990 1.550 ..P WKT 2010 05 07 12 12 25 31.3200 -97.3300 251.000 457.0 150.508 2.610 -999.990 -999.990 1.505 ..P WKT 2010 05 07 12 12 55 31.3200 -97.3300 251.000 457.0 151.830 2.890 -999.990 -999.990 1.518 ..P WKT 2010 05 07 12 13 25 31.3200 -97.3300 251.000 457.0 155.645 3.200 -999.990 -999.990 1.556 ..P WKT 2010 05 07 12 13 55 31.3200 -97.3300 251.000 457.0 151.424 2.710 -999.990 -999.990 1.514 ..P WKT 2010 05 07 12 14 25 31.3200 -97.3300 251.000 457.0 151.638 3.450 -999.990 -999.990 1.516 ..P WKT 2010 05 07 12 14 55 31.3200 -97.3300 251.000 457.0 154.900 3.250 -999.990 -999.990 1.549 ..P WKT 2010 05 07 12 19 55 31.3200 -97.3300 251.000 30.0 150.104 2.950 -999.990 -999.990 1.501 ..P WKT 2010 05 07 12 24 55 31.3200 -97.3300 251.000 122.0 152.791 3.980 -999.990 -999.990 1.528 ..P WKT 2010 05 07 12 29 55 31.3200 -97.3300 251.000 457.0 151.320 2.670 -999.990 -999.990 1.513 ..P WKT 2010 05 07 12 34 55 31.3200 -97.3300 251.000 30.0 157.333 3.550 -999.990 -999.990 1.573 ..P WKT 2010 05 07 12 39 55 31.3200 -97.3300 251.000 122.0 156.417 4.680 -999.990 -999.990 1.564 ..P WKT 2010 05 07 12 44 55 31.3200 -97.3300 251.000 457.0 156.609 2.540 -999.990 -999.990 1.566 ..P WKT 2010 05 07 12 54 55 31.3200 -97.3300 251.000 30.0 151.405 2.650 -999.990 -999.990 1.514 ..P WKT 2010 05 07 12 59 55 31.3200 -97.3300 251.000 122.0 164.024 2.130 -999.990 -999.990 1.640 ..P WKT 2010 05 07 13 04 55 31.3200 -97.3300 251.000 457.0 145.046 3.340 -999.990 -999.990 1.450 ..P WKT 2010 05 07 13 09 55 31.3200 -97.3300 251.000 30.0 151.152 1.990 -999.990 -999.990 1.512 ..P WKT 2010 05 07 13 14 55 31.3200 -97.3300 251.000 122.0 156.703 1.820 -999.990 -999.990 1.567 ..P WKT 2010 05 07 13 19 55 31.3200 -97.3300 251.000 457.0 161.284 2.850 -999.990 -999.990 1.613 ..P WKT 2010 05 07 13 29 55 31.3200 -97.3300 251.000 30.0 154.667 2.710 -999.990 -999.990 1.547 ..P WKT 2010 05 07 13 34 55 31.3200 -97.3300 251.000 122.0 156.358 2.170 -999.990 -999.990 1.564 ..P WKT 2010 05 07 13 39 55 31.3200 -97.3300 251.000 457.0 157.079 2.150 -999.990 -999.990 1.571 ..P WKT 2010 05 07 13 44 55 31.3200 -97.3300 251.000 30.0 156.136 3.790 -999.990 -999.990 1.561 ..P WKT 2010 05 07 13 49 55 31.3200 -97.3300 251.000 122.0 160.737 2.860 -999.990 -999.990 1.607 ..P WKT 2010 05 07 13 54 55 31.3200 -97.3300 251.000 457.0 152.726 3.200 -999.990 -999.990 1.527 ..P WKT 2010 05 07 14 04 55 31.3200 -97.3300 251.000 30.0 164.800 3.260 -999.990 -999.990 1.648 ..P WKT 2010 05 07 14 09 55 31.3200 -97.3300 251.000 122.0 169.223 4.190 -999.990 -999.990 1.692 ..P WKT 2010 05 07 14 14 55 31.3200 -97.3300 251.000 457.0 155.352 3.920 -999.990 -999.990 1.554 ..P WKT 2010 05 07 14 19 55 31.3200 -97.3300 251.000 30.0 159.636 4.150 -999.990 -999.990 1.596 ..P WKT 2010 05 07 14 24 55 31.3200 -97.3300 251.000 122.0 170.574 3.800 -999.990 -999.990 1.706 ..P WKT 2010 05 07 14 29 55 31.3200 -97.3300 251.000 457.0 166.542 3.350 -999.990 -999.990 1.665 ..P WKT 2010 05 07 14 39 55 31.3200 -97.3300 251.000 30.0 165.727 3.600 -999.990 -999.990 1.657 ..P WKT 2010 05 07 14 44 55 31.3200 -97.3300 251.000 122.0 165.477 4.290 -999.990 -999.990 1.655 ..P WKT 2010 05 07 14 49 55 31.3200 -97.3300 251.000 457.0 164.950 3.240 -999.990 -999.990 1.649 ..P WKT 2010 05 07 14 54 55 31.3200 -97.3300 251.000 30.0 159.711 3.020 -999.990 -999.990 1.597 ..P WKT 2010 05 07 14 59 55 31.3200 -97.3300 251.000 122.0 166.392 3.080 -999.990 -999.990 1.664 ..P WKT 2010 05 07 15 04 55 31.3200 -97.3300 251.000 457.0 169.191 3.080 -999.990 -999.990 1.692 ..P WKT 2010 05 07 15 14 55 31.3200 -97.3300 251.000 30.0 160.237 3.130 -999.990 -999.990 1.602 ..P WKT 2010 05 07 15 19 55 31.3200 -97.3300 251.000 122.0 168.997 3.360 -999.990 -999.990 1.690 ..P WKT 2010 05 07 15 24 55 31.3200 -97.3300 251.000 457.0 159.739 4.020 -999.990 -999.990 1.597 ..P WKT 2010 05 07 15 29 55 31.3200 -97.3300 251.000 30.0 156.855 4.890 -999.990 -999.990 1.569 ..P WKT 2010 05 07 15 34 55 31.3200 -97.3300 251.000 122.0 162.566 4.230 -999.990 -999.990 1.626 ..P WKT 2010 05 07 15 39 55 31.3200 -97.3300 251.000 457.0 160.238 2.850 -999.990 -999.990 1.602 ..P WKT 2010 05 07 15 49 55 31.3200 -97.3300 251.000 30.0 156.887 2.550 -999.990 -999.990 1.569 ..P WKT 2010 05 07 15 54 55 31.3200 -97.3300 251.000 122.0 166.954 3.720 -999.990 -999.990 1.670 ..P WKT 2010 05 07 15 59 55 31.3200 -97.3300 251.000 457.0 160.388 4.220 -999.990 -999.990 1.604 ..P WKT 2010 05 07 16 04 55 31.3200 -97.3300 251.000 30.0 164.910 3.690 -999.990 -999.990 1.649 ..P WKT 2010 05 07 16 09 55 31.3200 -97.3300 251.000 122.0 171.652 3.660 -999.990 -999.990 1.717 ..P WKT 2010 05 07 16 14 55 31.3200 -97.3300 251.000 457.0 167.858 3.070 -999.990 -999.990 1.679 ..P WKT 2010 05 07 16 24 55 31.3200 -97.3300 251.000 30.0 167.536 2.750 -999.990 -999.990 1.675 ..P WKT 2010 05 07 16 29 55 31.3200 -97.3300 251.000 122.0 174.338 4.460 -999.990 -999.990 1.743 ..P WKT 2010 05 07 16 34 55 31.3200 -97.3300 251.000 457.0 172.266 3.720 -999.990 -999.990 1.723 ..P WKT 2010 05 07 16 39 55 31.3200 -97.3300 251.000 30.0 163.540 5.240 -999.990 -999.990 1.635 ..P WKT 2010 05 07 16 44 55 31.3200 -97.3300 251.000 122.0 168.123 4.000 -999.990 -999.990 1.681 ..P WKT 2010 05 07 16 49 55 31.3200 -97.3300 251.000 457.0 169.101 4.520 -999.990 -999.990 1.691 ..P WKT 2010 05 07 17 04 55 31.3200 -97.3300 251.000 30.0 166.005 6.360 -999.990 -999.990 1.660 ..P WKT 2010 05 07 17 09 55 31.3200 -97.3300 251.000 122.0 168.821 5.080 -999.990 -999.990 1.688 ..P WKT 2010 05 07 17 14 55 31.3200 -97.3300 251.000 457.0 170.665 4.790 -999.990 -999.990 1.707 ..P WKT 2010 05 07 17 19 55 31.3200 -97.3300 251.000 30.0 174.313 4.770 -999.990 -999.990 1.743 ..P WKT 2010 05 07 17 24 55 31.3200 -97.3300 251.000 122.0 180.179 4.050 -999.990 -999.990 1.802 ..P WKT 2010 05 07 17 29 55 31.3200 -97.3300 251.000 457.0 176.616 2.930 -999.990 -999.990 1.766 ..P WKT 2010 05 07 17 39 55 31.3200 -97.3300 251.000 30.0 176.548 3.240 -999.990 -999.990 1.765 ..P WKT 2010 05 07 17 44 55 31.3200 -97.3300 251.000 122.0 182.954 4.450 -999.990 -999.990 1.830 ..P WKT 2010 05 07 17 49 55 31.3200 -97.3300 251.000 457.0 172.999 4.670 -999.990 -999.990 1.730 ..P WKT 2010 05 07 17 54 55 31.3200 -97.3300 251.000 30.0 169.422 4.560 -999.990 -999.990 1.694 ..P WKT 2010 05 07 17 59 55 31.3200 -97.3300 251.000 122.0 168.063 4.400 -999.990 -999.990 1.681 ..P WKT 2010 05 07 18 04 55 31.3200 -97.3300 251.000 457.0 164.763 4.020 -999.990 -999.990 1.648 ..P WKT 2010 05 07 18 14 55 31.3200 -97.3300 251.000 30.0 169.335 4.740 -999.990 -999.990 1.693 ..P WKT 2010 05 07 18 19 55 31.3200 -97.3300 251.000 122.0 178.593 3.610 -999.990 -999.990 1.786 ..P WKT 2010 05 07 18 24 55 31.3200 -97.3300 251.000 457.0 172.738 4.570 -999.990 -999.990 1.727 ..P WKT 2010 05 07 18 29 55 31.3200 -97.3300 251.000 30.0 169.933 4.080 -999.990 -999.990 1.699 ..P WKT 2010 05 07 18 34 55 31.3200 -97.3300 251.000 122.0 179.330 3.630 -999.990 -999.990 1.793 ..P WKT 2010 05 07 18 39 55 31.3200 -97.3300 251.000 457.0 172.643 4.620 -999.990 -999.990 1.726 ..P WKT 2010 05 07 18 49 55 31.3200 -97.3300 251.000 30.0 176.304 3.120 -999.990 -999.990 1.763 ..P WKT 2010 05 07 18 54 55 31.3200 -97.3300 251.000 122.0 175.975 3.120 -999.990 -999.990 1.760 ..P WKT 2010 05 07 18 59 55 31.3200 -97.3300 251.000 457.0 168.436 3.050 -999.990 -999.990 1.684 ..P WKT 2010 05 07 19 04 55 31.3200 -97.3300 251.000 30.0 180.448 3.060 -999.990 -999.990 1.804 ..P WKT 2010 05 07 19 09 55 31.3200 -97.3300 251.000 122.0 183.586 3.160 -999.990 -999.990 1.836 ..P WKT 2010 05 07 19 14 55 31.3200 -97.3300 251.000 457.0 179.791 2.770 -999.990 -999.990 1.798 ..P WKT 2010 05 07 19 24 55 31.3200 -97.3300 251.000 30.0 174.815 3.820 -999.990 -999.990 1.748 ..P WKT 2010 05 07 19 29 55 31.3200 -97.3300 251.000 122.0 180.845 3.400 -999.990 -999.990 1.808 ..P WKT 2010 05 07 19 34 55 31.3200 -97.3300 251.000 457.0 171.345 3.100 -999.990 -999.990 1.713 ..P WKT 2010 05 07 19 39 55 31.3200 -97.3300 251.000 30.0 163.230 2.790 -999.990 -999.990 1.632 ..P WKT 2010 05 07 19 44 55 31.3200 -97.3300 251.000 122.0 172.865 3.200 -999.990 -999.990 1.729 ..P WKT 2010 05 07 19 49 55 31.3200 -97.3300 251.000 457.0 171.963 3.380 -999.990 -999.990 1.720 ..P WKT 2010 05 07 19 59 55 31.3200 -97.3300 251.000 30.0 168.769 5.590 -999.990 -999.990 1.688 ..P WKT 2010 05 07 20 04 55 31.3200 -97.3300 251.000 122.0 159.545 4.870 -999.990 -999.990 1.595 ..P WKT 2010 05 07 20 09 55 31.3200 -97.3300 251.000 457.0 164.466 4.770 -999.990 -999.990 1.645 ..P WKT 2010 05 07 20 14 55 31.3200 -97.3300 251.000 30.0 160.234 3.070 -999.990 -999.990 1.602 ..P WKT 2010 05 07 20 19 55 31.3200 -97.3300 251.000 122.0 163.491 4.910 -999.990 -999.990 1.635 ..P WKT 2010 05 07 20 24 55 31.3200 -97.3300 251.000 457.0 165.362 3.590 -999.990 -999.990 1.654 ..P WKT 2010 05 07 20 34 55 31.3200 -97.3300 251.000 30.0 161.177 3.230 -999.990 -999.990 1.612 ..P WKT 2010 05 07 20 39 55 31.3200 -97.3300 251.000 122.0 166.494 3.430 -999.990 -999.990 1.665 ..P WKT 2010 05 07 20 44 55 31.3200 -97.3300 251.000 457.0 162.659 4.020 -999.990 -999.990 1.627 ..P WKT 2010 05 07 20 49 55 31.3200 -97.3300 251.000 30.0 160.765 4.220 -999.990 -999.990 1.608 ..P WKT 2010 05 07 20 54 55 31.3200 -97.3300 251.000 122.0 162.893 5.050 -999.990 -999.990 1.629 ..P WKT 2010 05 07 20 59 55 31.3200 -97.3300 251.000 457.0 157.531 4.730 -999.990 -999.990 1.575 ..P WKT 2010 05 07 21 09 55 31.3200 -97.3300 251.000 30.0 160.954 4.960 -999.990 -999.990 1.610 ..P WKT 2010 05 07 21 14 55 31.3200 -97.3300 251.000 122.0 165.024 4.940 -999.990 -999.990 1.650 ..P WKT 2010 05 07 21 19 55 31.3200 -97.3300 251.000 457.0 164.794 4.790 -999.990 -999.990 1.648 ..P WKT 2010 05 07 21 24 55 31.3200 -97.3300 251.000 30.0 171.638 4.070 -999.990 -999.990 1.716 ..P WKT 2010 05 07 21 29 55 31.3200 -97.3300 251.000 122.0 164.612 3.720 -999.990 -999.990 1.646 ..P WKT 2010 05 07 21 34 55 31.3200 -97.3300 251.000 457.0 164.937 3.300 -999.990 -999.990 1.649 ..P WKT 2010 05 07 21 44 55 31.3200 -97.3300 251.000 30.0 166.993 3.190 -999.990 -999.990 1.670 ..P WKT 2010 05 07 21 49 55 31.3200 -97.3300 251.000 122.0 167.893 3.810 -999.990 -999.990 1.679 ..P WKT 2010 05 07 21 54 55 31.3200 -97.3300 251.000 457.0 163.106 3.770 -999.990 -999.990 1.631 ..P WKT 2010 05 07 21 59 55 31.3200 -97.3300 251.000 30.0 170.524 3.100 -999.990 -999.990 1.705 ..P WKT 2010 05 07 22 04 55 31.3200 -97.3300 251.000 122.0 167.679 3.480 -999.990 -999.990 1.677 ..P WKT 2010 05 07 22 09 55 31.3200 -97.3300 251.000 457.0 162.892 3.450 -999.990 -999.990 1.629 ..P WKT 2010 05 07 22 19 55 31.3200 -97.3300 251.000 30.0 169.902 3.660 -999.990 -999.990 1.699 ..P WKT 2010 05 07 22 24 55 31.3200 -97.3300 251.000 122.0 169.633 3.260 -999.990 -999.990 1.696 ..P WKT 2010 05 07 22 29 55 31.3200 -97.3300 251.000 457.0 161.041 3.000 -999.990 -999.990 1.610 ..P WKT 2010 05 07 22 34 55 31.3200 -97.3300 251.000 30.0 162.020 2.870 -999.990 -999.990 1.620 ..P WKT 2010 05 07 22 39 55 31.3200 -97.3300 251.000 122.0 162.445 3.340 -999.990 -999.990 1.624 ..P WKT 2010 05 07 22 44 55 31.3200 -97.3300 251.000 457.0 154.962 3.580 -999.990 -999.990 1.550 ..P WKT 2010 05 07 22 54 55 31.3200 -97.3300 251.000 30.0 163.459 2.910 -999.990 -999.990 1.635 ..P WKT 2010 05 07 22 59 55 31.3200 -97.3300 251.000 122.0 161.406 2.830 -999.990 -999.990 1.614 ..P WKT 2010 05 07 23 04 55 31.3200 -97.3300 251.000 457.0 161.295 3.560 -999.990 -999.990 1.613 ..P WKT 2010 05 07 23 09 55 31.3200 -97.3300 251.000 30.0 158.410 3.920 -999.990 -999.990 1.584 ..P WKT 2010 05 07 23 14 55 31.3200 -97.3300 251.000 122.0 172.447 4.800 -999.990 -999.990 1.724 ..P WKT 2010 05 07 23 19 55 31.3200 -97.3300 251.000 457.0 168.730 3.430 -999.990 -999.990 1.687 ..P WKT 2010 05 07 23 29 55 31.3200 -97.3300 251.000 30.0 160.754 3.050 -999.990 -999.990 1.608 ..P WKT 2010 05 07 23 34 55 31.3200 -97.3300 251.000 122.0 165.652 4.030 -999.990 -999.990 1.657 ..P WKT 2010 05 07 23 39 55 31.3200 -97.3300 251.000 457.0 166.943 4.490 -999.990 -999.990 1.669 ..P WKT 2010 05 07 23 44 55 31.3200 -97.3300 251.000 30.0 152.143 4.120 -999.990 -999.990 1.521 ..P WKT 2010 05 07 23 49 55 31.3200 -97.3300 251.000 122.0 160.647 2.790 -999.990 -999.990 1.606 ..P WKT 2010 05 08 00 09 55 31.3200 -97.3300 251.000 457.0 156.000 2.950 -999.990 -999.990 1.560 ..P WKT 2010 05 08 00 10 25 31.3200 -97.3300 251.000 457.0 156.843 2.960 -999.990 -999.990 1.568 ..P WKT 2010 05 08 00 10 55 31.3200 -97.3300 251.000 457.0 155.190 3.180 -999.990 -999.990 1.552 ..P WKT 2010 05 08 00 11 25 31.3200 -97.3300 251.000 457.0 155.201 3.180 -999.990 -999.990 1.552 ..P WKT 2010 05 08 00 11 55 31.3200 -97.3300 251.000 457.0 158.819 3.290 -999.990 -999.990 1.588 ..P WKT 2010 05 08 00 12 25 31.3200 -97.3300 251.000 457.0 154.946 2.980 -999.990 -999.990 1.549 ..P WKT 2010 05 08 00 12 55 31.3200 -97.3300 251.000 457.0 149.408 3.370 -999.990 -999.990 1.494 ..P WKT 2010 05 08 00 13 25 31.3200 -97.3300 251.000 457.0 153.581 4.130 -999.990 -999.990 1.536 ..P WKT 2010 05 08 00 13 55 31.3200 -97.3300 251.000 457.0 156.090 3.190 -999.990 -999.990 1.561 ..P WKT 2010 05 08 00 14 25 31.3200 -97.3300 251.000 457.0 149.442 4.590 -999.990 -999.990 1.494 ..P WKT 2010 05 08 00 14 55 31.3200 -97.3300 251.000 457.0 151.950 4.600 -999.990 -999.990 1.519 ..P WKT 2010 05 08 00 19 55 31.3200 -97.3300 251.000 30.0 155.392 3.800 -999.990 -999.990 1.554 ..P WKT 2010 05 08 00 24 55 31.3200 -97.3300 251.000 122.0 153.563 3.230 -999.990 -999.990 1.536 ..P WKT 2010 05 08 00 29 55 31.3200 -97.3300 251.000 457.0 156.727 3.260 -999.990 -999.990 1.567 ..P WKT 2010 05 08 00 34 55 31.3200 -97.3300 251.000 30.0 153.233 4.000 -999.990 -999.990 1.532 ..P WKT 2010 05 08 00 39 55 31.3200 -97.3300 251.000 122.0 161.670 5.060 -999.990 -999.990 1.617 ..P WKT 2010 05 08 00 44 55 31.3200 -97.3300 251.000 457.0 159.285 3.300 -999.990 -999.990 1.593 ..P WKT 2010 05 08 00 54 55 31.3200 -97.3300 251.000 30.0 157.643 3.370 -999.990 -999.990 1.576 ..P WKT 2010 05 08 00 59 55 31.3200 -97.3300 251.000 122.0 159.911 4.180 -999.990 -999.990 1.599 ..P WKT 2010 05 08 01 04 55 31.3200 -97.3300 251.000 457.0 157.741 2.920 -999.990 -999.990 1.577 ..P WKT 2010 05 08 01 09 55 31.3200 -97.3300 251.000 30.0 154.876 2.270 -999.990 -999.990 1.549 ..P WKT 2010 05 08 01 14 55 31.3200 -97.3300 251.000 122.0 158.255 2.410 -999.990 -999.990 1.583 ..P WKT 2010 05 08 01 19 55 31.3200 -97.3300 251.000 457.0 166.211 2.070 -999.990 -999.990 1.662 ..P WKT 2010 05 08 01 29 55 31.3200 -97.3300 251.000 30.0 156.003 4.120 -999.990 -999.990 1.560 ..P WKT 2010 05 08 01 34 55 31.3200 -97.3300 251.000 122.0 160.452 2.730 -999.990 -999.990 1.605 ..P WKT 2010 05 08 01 39 55 31.3200 -97.3300 251.000 457.0 168.508 2.960 -999.990 -999.990 1.685 ..P WKT 2010 05 08 01 44 55 31.3200 -97.3300 251.000 30.0 161.303 2.530 -999.990 -999.990 1.613 ..P WKT 2010 05 08 01 49 55 31.3200 -97.3300 251.000 122.0 162.838 4.120 -999.990 -999.990 1.628 ..P WKT 2010 05 08 01 54 55 31.3200 -97.3300 251.000 457.0 163.818 3.860 -999.990 -999.990 1.638 ..P WKT 2010 05 08 02 04 55 31.3200 -97.3300 251.000 30.0 165.185 3.220 -999.990 -999.990 1.652 ..P WKT 2010 05 08 02 09 55 31.3200 -97.3300 251.000 122.0 167.512 4.020 -999.990 -999.990 1.675 ..P WKT 2010 05 08 02 14 55 31.3200 -97.3300 251.000 457.0 166.788 4.060 -999.990 -999.990 1.668 ..P WKT 2010 05 08 02 19 55 31.3200 -97.3300 251.000 30.0 171.058 3.280 -999.990 -999.990 1.711 ..P WKT 2010 05 08 02 24 55 31.3200 -97.3300 251.000 122.0 172.832 5.670 -999.990 -999.990 1.728 ..P WKT 2010 05 08 02 29 55 31.3200 -97.3300 251.000 457.0 171.275 3.280 -999.990 -999.990 1.713 ..P WKT 2010 05 08 02 39 55 31.3200 -97.3300 251.000 30.0 173.335 3.500 -999.990 -999.990 1.733 ..P WKT 2010 05 08 02 44 55 31.3200 -97.3300 251.000 122.0 179.588 2.930 -999.990 -999.990 1.796 ..P WKT 2010 05 08 02 49 55 31.3200 -97.3300 251.000 457.0 169.053 3.230 -999.990 -999.990 1.691 ..P WKT 2010 05 08 02 54 55 31.3200 -97.3300 251.000 30.0 171.837 2.940 -999.990 -999.990 1.718 ..P WKT 2010 05 08 02 59 55 31.3200 -97.3300 251.000 122.0 172.679 2.640 -999.990 -999.990 1.727 ..P WKT 2010 05 08 03 04 55 31.3200 -97.3300 251.000 457.0 172.410 2.530 -999.990 -999.990 1.724 ..P WKT 2010 05 08 03 14 55 31.3200 -97.3300 251.000 30.0 174.787 4.290 -999.990 -999.990 1.748 ..P WKT 2010 05 08 03 19 55 31.3200 -97.3300 251.000 122.0 179.930 2.730 -999.990 -999.990 1.799 ..P WKT 2010 05 08 03 24 55 31.3200 -97.3300 251.000 457.0 175.638 3.550 -999.990 -999.990 1.756 ..P WKT 2010 05 08 03 29 55 31.3200 -97.3300 251.000 30.0 173.566 3.580 -999.990 -999.990 1.736 ..P WKT 2010 05 08 03 34 55 31.3200 -97.3300 251.000 122.0 178.153 4.130 -999.990 -999.990 1.782 ..P WKT 2010 05 08 03 39 55 31.3200 -97.3300 251.000 457.0 180.799 3.550 -999.990 -999.990 1.808 ..P WKT 2010 05 08 03 49 55 31.3200 -97.3300 251.000 30.0 172.452 3.000 -999.990 -999.990 1.725 ..P WKT 2010 05 08 03 54 55 31.3200 -97.3300 251.000 122.0 181.996 2.820 -999.990 -999.990 1.820 ..P WKT 2010 05 08 03 59 55 31.3200 -97.3300 251.000 457.0 168.507 3.370 -999.990 -999.990 1.685 ..P WKT 2010 05 08 04 04 55 31.3200 -97.3300 251.000 30.0 173.055 2.790 -999.990 -999.990 1.731 ..P WKT 2010 05 08 04 09 55 31.3200 -97.3300 251.000 122.0 183.153 2.820 -999.990 -999.990 1.832 ..P WKT 2010 05 08 04 14 55 31.3200 -97.3300 251.000 457.0 168.555 2.490 -999.990 -999.990 1.686 ..P WKT 2010 05 08 04 24 55 31.3200 -97.3300 251.000 30.0 181.992 2.180 -999.990 -999.990 1.820 ..P WKT 2010 05 08 04 29 55 31.3200 -97.3300 251.000 122.0 192.823 2.650 -999.990 -999.990 1.928 ..P WKT 2010 05 08 04 34 55 31.3200 -97.3300 251.000 457.0 174.241 3.150 -999.990 -999.990 1.742 ..P WKT 2010 05 08 04 39 55 31.3200 -97.3300 251.000 30.0 186.459 2.720 -999.990 -999.990 1.865 ..P WKT 2010 05 08 04 44 55 31.3200 -97.3300 251.000 122.0 201.731 2.890 -999.990 -999.990 2.017 ..P WKT 2010 05 08 04 49 55 31.3200 -97.3300 251.000 457.0 182.870 2.900 -999.990 -999.990 1.829 ..P WKT 2010 05 08 05 04 55 31.3200 -97.3300 251.000 30.0 185.668 3.440 -999.990 -999.990 1.857 ..P WKT 2010 05 08 05 09 55 31.3200 -97.3300 251.000 122.0 190.461 3.170 -999.990 -999.990 1.905 ..P WKT 2010 05 08 05 14 55 31.3200 -97.3300 251.000 457.0 160.845 4.750 -999.990 -999.990 1.608 ..P WKT 2010 05 08 05 19 55 31.3200 -97.3300 251.000 30.0 196.164 3.910 -999.990 -999.990 1.962 ..P WKT 2010 05 08 05 24 55 31.3200 -97.3300 251.000 122.0 189.996 3.470 -999.990 -999.990 1.900 ..P WKT 2010 05 08 05 29 55 31.3200 -97.3300 251.000 457.0 159.131 5.140 -999.990 -999.990 1.591 ..P WKT 2010 05 08 05 39 55 31.3200 -97.3300 251.000 30.0 188.889 2.830 -999.990 -999.990 1.889 ..P WKT 2010 05 08 05 44 55 31.3200 -97.3300 251.000 122.0 186.658 3.200 -999.990 -999.990 1.867 ..P WKT 2010 05 08 05 49 55 31.3200 -97.3300 251.000 457.0 159.175 3.520 -999.990 -999.990 1.592 ..P WKT 2010 05 08 05 54 55 31.3200 -97.3300 251.000 30.0 196.627 4.480 -999.990 -999.990 1.966 ..P WKT 2010 05 08 05 59 55 31.3200 -97.3300 251.000 122.0 197.726 4.260 -999.990 -999.990 1.977 ..P WKT 2010 05 08 06 04 55 31.3200 -97.3300 251.000 457.0 167.468 3.550 -999.990 -999.990 1.675 ..P WKT 2010 05 08 06 14 55 31.3200 -97.3300 251.000 30.0 184.434 4.190 -999.990 -999.990 1.844 ..P WKT 2010 05 08 06 19 55 31.3200 -97.3300 251.000 122.0 180.043 4.110 -999.990 -999.990 1.800 ..P WKT 2010 05 08 06 24 55 31.3200 -97.3300 251.000 457.0 159.140 4.030 -999.990 -999.990 1.591 ..P WKT 2010 05 08 06 29 55 31.3200 -97.3300 251.000 30.0 176.533 5.410 -999.990 -999.990 1.765 ..P WKT 2010 05 08 06 34 55 31.3200 -97.3300 251.000 122.0 168.811 3.820 -999.990 -999.990 1.688 ..P WKT 2010 05 08 06 39 55 31.3200 -97.3300 251.000 457.0 141.387 3.400 -999.990 -999.990 1.414 ..P WKT 2010 05 08 06 49 55 31.3200 -97.3300 251.000 30.0 164.934 3.540 -999.990 -999.990 1.649 ..P WKT 2010 05 08 06 54 55 31.3200 -97.3300 251.000 122.0 161.237 6.050 -999.990 -999.990 1.612 ..P WKT 2010 05 08 06 59 55 31.3200 -97.3300 251.000 457.0 157.262 4.340 -999.990 -999.990 1.573 ..P WKT 2010 05 08 07 04 55 31.3200 -97.3300 251.000 30.0 162.167 3.400 -999.990 -999.990 1.622 ..P WKT 2010 05 08 07 09 55 31.3200 -97.3300 251.000 122.0 159.302 2.520 -999.990 -999.990 1.593 ..P WKT 2010 05 08 07 14 55 31.3200 -97.3300 251.000 457.0 163.374 3.800 -999.990 -999.990 1.634 ..P WKT 2010 05 08 07 24 55 31.3200 -97.3300 251.000 30.0 152.055 3.370 -999.990 -999.990 1.521 ..P WKT 2010 05 08 07 29 55 31.3200 -97.3300 251.000 122.0 153.868 2.740 -999.990 -999.990 1.539 ..P WKT 2010 05 08 07 34 55 31.3200 -97.3300 251.000 457.0 144.857 2.600 -999.990 -999.990 1.449 ..P WKT 2010 05 08 07 39 55 31.3200 -97.3300 251.000 30.0 148.058 3.600 -999.990 -999.990 1.481 ..P WKT 2010 05 08 07 44 55 31.3200 -97.3300 251.000 122.0 148.206 4.440 -999.990 -999.990 1.482 ..P WKT 2010 05 08 07 49 55 31.3200 -97.3300 251.000 457.0 145.301 2.020 -999.990 -999.990 1.453 ..P WKT 2010 05 08 07 59 55 31.3200 -97.3300 251.000 30.0 148.768 2.110 -999.990 -999.990 1.488 ..P WKT 2010 05 08 08 04 55 31.3200 -97.3300 251.000 122.0 145.428 2.480 -999.990 -999.990 1.454 ..P WKT 2010 05 08 08 09 55 31.3200 -97.3300 251.000 457.0 147.082 2.730 -999.990 -999.990 1.471 ..P WKT 2010 05 08 08 14 55 31.3200 -97.3300 251.000 30.0 142.908 2.830 -999.990 -999.990 1.429 ..P WKT 2010 05 08 08 19 55 31.3200 -97.3300 251.000 122.0 149.281 2.600 -999.990 -999.990 1.493 ..P WKT 2010 05 08 08 24 55 31.3200 -97.3300 251.000 457.0 144.830 3.680 -999.990 -999.990 1.448 ..P WKT 2010 05 08 08 34 55 31.3200 -97.3300 251.000 30.0 140.784 2.440 -999.990 -999.990 1.408 ..P WKT 2010 05 08 08 39 55 31.3200 -97.3300 251.000 122.0 138.137 2.770 -999.990 -999.990 1.381 ..P WKT 2010 05 08 08 44 55 31.3200 -97.3300 251.000 457.0 139.376 4.000 -999.990 -999.990 1.394 ..P WKT 2010 05 08 08 49 55 31.3200 -97.3300 251.000 30.0 135.063 4.390 -999.990 -999.990 1.351 ..P WKT 2010 05 08 08 54 55 31.3200 -97.3300 251.000 122.0 139.493 3.930 -999.990 -999.990 1.395 ..P WKT 2010 05 08 08 59 55 31.3200 -97.3300 251.000 457.0 131.434 3.560 -999.990 -999.990 1.314 ..P WKT 2010 05 08 09 09 55 31.3200 -97.3300 251.000 30.0 128.934 3.880 -999.990 -999.990 1.289 ..P WKT 2010 05 08 09 14 55 31.3200 -97.3300 251.000 122.0 133.939 3.780 -999.990 -999.990 1.339 ..P WKT 2010 05 08 09 19 55 31.3200 -97.3300 251.000 457.0 128.259 4.930 -999.990 -999.990 1.283 ..P WKT 2010 05 08 09 24 55 31.3200 -97.3300 251.000 30.0 138.953 5.000 -999.990 -999.990 1.390 ..P WKT 2010 05 08 09 29 55 31.3200 -97.3300 251.000 122.0 134.105 4.010 -999.990 -999.990 1.341 ..P WKT 2010 05 08 09 34 55 31.3200 -97.3300 251.000 457.0 131.477 4.230 -999.990 -999.990 1.315 ..P WKT 2010 05 08 09 44 55 31.3200 -97.3300 251.000 30.0 137.145 3.930 -999.990 -999.990 1.371 ..P WKT 2010 05 08 09 49 55 31.3200 -97.3300 251.000 122.0 135.727 4.040 -999.990 -999.990 1.357 ..P WKT 2010 05 08 09 54 55 31.3200 -97.3300 251.000 457.0 130.979 3.770 -999.990 -999.990 1.310 ..P WKT 2010 05 08 09 59 55 31.3200 -97.3300 251.000 30.0 134.140 3.970 -999.990 -999.990 1.341 ..P WKT 2010 05 08 10 04 55 31.3200 -97.3300 251.000 122.0 137.717 3.440 -999.990 -999.990 1.377 ..P WKT 2010 05 08 10 09 55 31.3200 -97.3300 251.000 457.0 133.801 4.130 -999.990 -999.990 1.338 ..P WKT 2010 05 08 10 19 55 31.3200 -97.3300 251.000 30.0 132.968 3.070 -999.990 -999.990 1.330 ..P WKT 2010 05 08 10 24 55 31.3200 -97.3300 251.000 122.0 128.972 3.710 -999.990 -999.990 1.290 ..P WKT 2010 05 08 10 29 55 31.3200 -97.3300 251.000 457.0 135.107 2.810 -999.990 -999.990 1.351 ..P WKT 2010 05 08 10 34 55 31.3200 -97.3300 251.000 30.0 130.001 2.900 -999.990 -999.990 1.300 ..P WKT 2010 05 08 10 39 55 31.3200 -97.3300 251.000 122.0 135.304 2.660 -999.990 -999.990 1.353 ..P WKT 2010 05 08 10 44 55 31.3200 -97.3300 251.000 457.0 131.170 2.940 -999.990 -999.990 1.312 ..P WKT 2010 05 08 10 54 55 31.3200 -97.3300 251.000 30.0 133.487 2.390 -999.990 -999.990 1.335 ..P WKT 2010 05 08 10 59 55 31.3200 -97.3300 251.000 122.0 133.833 3.480 -999.990 -999.990 1.338 ..P WKT 2010 05 08 11 04 55 31.3200 -97.3300 251.000 457.0 133.624 4.680 -999.990 -999.990 1.336 ..P WKT 2010 05 08 11 09 55 31.3200 -97.3300 251.000 30.0 127.587 3.650 -999.990 -999.990 1.276 ..P WKT 2010 05 08 11 14 55 31.3200 -97.3300 251.000 122.0 135.149 3.130 -999.990 -999.990 1.351 ..P WKT 2010 05 08 11 19 55 31.3200 -97.3300 251.000 457.0 126.614 3.130 -999.990 -999.990 1.266 ..P WKT 2010 05 08 11 29 55 31.3200 -97.3300 251.000 30.0 135.761 2.470 -999.990 -999.990 1.358 ..P WKT 2010 05 08 11 34 55 31.3200 -97.3300 251.000 122.0 127.910 5.640 -999.990 -999.990 1.279 ..P WKT 2010 05 08 11 39 55 31.3200 -97.3300 251.000 457.0 131.716 3.330 -999.990 -999.990 1.317 ..P WKT 2010 05 08 11 44 55 31.3200 -97.3300 251.000 30.0 135.521 4.380 -999.990 -999.990 1.355 ..P WKT 2010 05 08 11 49 55 31.3200 -97.3300 251.000 122.0 136.829 3.300 -999.990 -999.990 1.368 ..P WKT 2010 05 08 12 09 55 31.3200 -97.3300 251.000 457.0 136.514 3.380 -999.990 -999.990 1.365 ..P WKT 2010 05 08 12 10 25 31.3200 -97.3300 251.000 457.0 134.837 2.130 -999.990 -999.990 1.348 ..P WKT 2010 05 08 12 10 55 31.3200 -97.3300 251.000 457.0 131.494 3.590 -999.990 -999.990 1.315 ..P WKT 2010 05 08 12 11 25 31.3200 -97.3300 251.000 457.0 130.371 2.290 -999.990 -999.990 1.304 ..P WKT 2010 05 08 12 11 55 31.3200 -97.3300 251.000 457.0 131.747 3.020 -999.990 -999.990 1.317 ..P WKT 2010 05 08 12 12 25 31.3200 -97.3300 251.000 457.0 135.899 3.200 -999.990 -999.990 1.359 ..P WKT 2010 05 08 12 12 55 31.3200 -97.3300 251.000 457.0 130.335 2.560 -999.990 -999.990 1.303 ..P WKT 2010 05 08 12 13 25 31.3200 -97.3300 251.000 457.0 131.433 4.140 -999.990 -999.990 1.314 ..P WKT 2010 05 08 12 13 55 31.3200 -97.3300 251.000 457.0 131.977 2.700 -999.990 -999.990 1.320 ..P WKT 2010 05 08 12 14 25 31.3200 -97.3300 251.000 457.0 138.349 3.560 -999.990 -999.990 1.383 ..P WKT 2010 05 08 12 14 55 31.3200 -97.3300 251.000 457.0 134.451 3.430 -999.990 -999.990 1.345 ..P WKT 2010 05 08 12 19 55 31.3200 -97.3300 251.000 30.0 135.997 2.640 -999.990 -999.990 1.360 ..P WKT 2010 05 08 12 24 55 31.3200 -97.3300 251.000 122.0 132.544 4.160 -999.990 -999.990 1.325 ..P WKT 2010 05 08 12 29 55 31.3200 -97.3300 251.000 457.0 133.257 3.150 -999.990 -999.990 1.333 ..P WKT 2010 05 08 12 34 55 31.3200 -97.3300 251.000 30.0 132.303 3.510 -999.990 -999.990 1.323 ..P WKT 2010 05 08 12 39 55 31.3200 -97.3300 251.000 122.0 141.070 2.800 -999.990 -999.990 1.411 ..P WKT 2010 05 08 12 44 55 31.3200 -97.3300 251.000 457.0 138.728 2.890 -999.990 -999.990 1.387 ..P WKT 2010 05 08 12 54 55 31.3200 -97.3300 251.000 30.0 134.558 2.510 -999.990 -999.990 1.346 ..P WKT 2010 05 08 12 59 55 31.3200 -97.3300 251.000 122.0 136.065 2.710 -999.990 -999.990 1.361 ..P WKT 2010 05 08 13 04 55 31.3200 -97.3300 251.000 457.0 135.627 4.600 -999.990 -999.990 1.356 ..P WKT 2010 05 08 13 09 55 31.3200 -97.3300 251.000 30.0 133.522 2.830 -999.990 -999.990 1.335 ..P WKT 2010 05 08 13 14 55 31.3200 -97.3300 251.000 122.0 135.585 3.000 -999.990 -999.990 1.356 ..P WKT 2010 05 08 13 19 55 31.3200 -97.3300 251.000 457.0 138.065 3.090 -999.990 -999.990 1.381 ..P WKT 2010 05 08 13 29 55 31.3200 -97.3300 251.000 30.0 132.264 3.890 -999.990 -999.990 1.323 ..P WKT 2010 05 08 13 34 55 31.3200 -97.3300 251.000 122.0 136.214 2.950 -999.990 -999.990 1.362 ..P WKT 2010 05 08 13 39 55 31.3200 -97.3300 251.000 457.0 142.392 3.320 -999.990 -999.990 1.424 ..P WKT 2010 05 08 13 44 55 31.3200 -97.3300 251.000 30.0 134.107 2.630 -999.990 -999.990 1.341 ..P WKT 2010 05 08 13 49 55 31.3200 -97.3300 251.000 122.0 138.059 2.730 -999.990 -999.990 1.381 ..P WKT 2010 05 08 13 54 55 31.3200 -97.3300 251.000 457.0 136.031 2.740 -999.990 -999.990 1.360 ..P WKT 2010 05 08 14 04 55 31.3200 -97.3300 251.000 30.0 135.413 2.620 -999.990 -999.990 1.354 ..P WKT 2010 05 08 14 09 55 31.3200 -97.3300 251.000 122.0 134.457 4.040 -999.990 -999.990 1.345 ..P WKT 2010 05 08 14 14 55 31.3200 -97.3300 251.000 457.0 137.537 3.540 -999.990 -999.990 1.375 ..P WKT 2010 05 08 14 19 55 31.3200 -97.3300 251.000 30.0 133.938 2.780 -999.990 -999.990 1.339 ..P WKT 2010 05 08 14 24 55 31.3200 -97.3300 251.000 122.0 135.487 4.510 -999.990 -999.990 1.355 ..P WKT 2010 05 08 14 29 55 31.3200 -97.3300 251.000 457.0 129.520 3.980 -999.990 -999.990 1.295 ..P WKT 2010 05 08 14 39 55 31.3200 -97.3300 251.000 30.0 137.094 3.490 -999.990 -999.990 1.371 ..P WKT 2010 05 08 14 44 55 31.3200 -97.3300 251.000 122.0 138.664 3.070 -999.990 -999.990 1.387 ..P WKT 2010 05 08 14 49 55 31.3200 -97.3300 251.000 457.0 132.993 2.940 -999.990 -999.990 1.330 ..P WKT 2010 05 08 14 54 55 31.3200 -97.3300 251.000 30.0 133.449 3.730 -999.990 -999.990 1.334 ..P WKT 2010 05 08 14 59 55 31.3200 -97.3300 251.000 122.0 135.298 3.630 -999.990 -999.990 1.353 ..P WKT 2010 05 08 15 04 55 31.3200 -97.3300 251.000 457.0 132.411 3.280 -999.990 -999.990 1.324 ..P WKT 2010 05 08 15 14 55 31.3200 -97.3300 251.000 30.0 138.339 3.140 -999.990 -999.990 1.383 ..P WKT 2010 05 08 15 19 55 31.3200 -97.3300 251.000 122.0 141.025 2.710 -999.990 -999.990 1.410 ..P WKT 2010 05 08 15 24 55 31.3200 -97.3300 251.000 457.0 139.810 2.900 -999.990 -999.990 1.398 ..P WKT 2010 05 08 15 29 55 31.3200 -97.3300 251.000 30.0 138.316 3.520 -999.990 -999.990 1.383 ..P WKT 2010 05 08 15 34 55 31.3200 -97.3300 251.000 122.0 136.543 3.670 -999.990 -999.990 1.365 ..P WKT 2010 05 08 15 39 55 31.3200 -97.3300 251.000 457.0 136.999 4.750 -999.990 -999.990 1.370 ..P WKT 2010 05 08 15 49 55 31.3200 -97.3300 251.000 30.0 142.574 4.580 -999.990 -999.990 1.426 ..P WKT 2010 05 08 15 54 55 31.3200 -97.3300 251.000 122.0 143.788 3.570 -999.990 -999.990 1.438 ..P WKT 2010 05 08 15 59 55 31.3200 -97.3300 251.000 457.0 141.098 4.280 -999.990 -999.990 1.411 ..P WKT 2010 05 08 16 04 55 31.3200 -97.3300 251.000 30.0 132.551 4.070 -999.990 -999.990 1.326 ..P WKT 2010 05 08 16 09 55 31.3200 -97.3300 251.000 122.0 130.696 4.600 -999.990 -999.990 1.307 ..P WKT 2010 05 08 16 14 55 31.3200 -97.3300 251.000 457.0 133.304 3.550 -999.990 -999.990 1.333 ..P WKT 2010 05 08 16 24 55 31.3200 -97.3300 251.000 30.0 131.348 3.020 -999.990 -999.990 1.313 ..P WKT 2010 05 08 16 29 55 31.3200 -97.3300 251.000 122.0 139.060 3.600 -999.990 -999.990 1.391 ..P WKT 2010 05 08 16 34 55 31.3200 -97.3300 251.000 457.0 136.867 4.120 -999.990 -999.990 1.369 ..P WKT 2010 05 08 16 39 55 31.3200 -97.3300 251.000 30.0 143.604 4.350 -999.990 -999.990 1.436 ..P WKT 2010 05 08 16 44 55 31.3200 -97.3300 251.000 122.0 139.177 3.010 -999.990 -999.990 1.392 ..P WKT 2010 05 08 16 49 55 31.3200 -97.3300 251.000 457.0 144.102 3.270 -999.990 -999.990 1.441 ..P WKT 2010 05 08 17 04 55 31.3200 -97.3300 251.000 30.0 136.186 3.170 -999.990 -999.990 1.362 ..P WKT 2010 05 08 17 09 55 31.3200 -97.3300 251.000 122.0 143.588 3.300 -999.990 -999.990 1.436 ..P WKT 2010 05 08 17 14 55 31.3200 -97.3300 251.000 457.0 138.981 3.580 -999.990 -999.990 1.390 ..P WKT 2010 05 08 17 19 55 31.3200 -97.3300 251.000 30.0 133.117 4.210 -999.990 -999.990 1.331 ..P WKT 2010 05 08 17 24 55 31.3200 -97.3300 251.000 122.0 140.102 3.280 -999.990 -999.990 1.401 ..P WKT 2010 05 08 17 29 55 31.3200 -97.3300 251.000 457.0 134.935 3.630 -999.990 -999.990 1.349 ..P WKT 2010 05 08 17 39 55 31.3200 -97.3300 251.000 30.0 135.034 2.870 -999.990 -999.990 1.350 ..P WKT 2010 05 08 17 44 55 31.3200 -97.3300 251.000 122.0 142.400 3.540 -999.990 -999.990 1.424 ..P WKT 2010 05 08 17 49 55 31.3200 -97.3300 251.000 457.0 139.983 3.810 -999.990 -999.990 1.400 ..P WKT 2010 05 08 17 54 55 31.3200 -97.3300 251.000 30.0 133.093 3.890 -999.990 -999.990 1.331 ..P WKT 2010 05 08 17 59 55 31.3200 -97.3300 251.000 122.0 138.224 3.550 -999.990 -999.990 1.382 ..P WKT 2010 05 08 18 04 55 31.3200 -97.3300 251.000 457.0 130.634 4.610 -999.990 -999.990 1.306 ..P WKT 2010 05 08 18 14 55 31.3200 -97.3300 251.000 30.0 137.701 3.550 -999.990 -999.990 1.377 ..P WKT 2010 05 08 18 19 55 31.3200 -97.3300 251.000 122.0 137.821 3.810 -999.990 -999.990 1.378 ..P WKT 2010 05 08 18 24 55 31.3200 -97.3300 251.000 457.0 131.085 4.020 -999.990 -999.990 1.311 ..P WKT 2010 05 08 18 29 55 31.3200 -97.3300 251.000 30.0 135.540 3.840 -999.990 -999.990 1.355 ..P WKT 2010 05 08 18 34 55 31.3200 -97.3300 251.000 122.0 137.057 3.090 -999.990 -999.990 1.371 ..P WKT 2010 05 08 18 39 55 31.3200 -97.3300 251.000 457.0 137.177 3.490 -999.990 -999.990 1.372 ..P WKT 2010 05 08 18 49 55 31.3200 -97.3300 251.000 30.0 134.915 2.720 -999.990 -999.990 1.349 ..P WKT 2010 05 08 18 54 55 31.3200 -97.3300 251.000 122.0 135.333 2.730 -999.990 -999.990 1.353 ..P WKT 2010 05 08 18 59 55 31.3200 -97.3300 251.000 457.0 133.512 2.930 -999.990 -999.990 1.335 ..P WKT 2010 05 08 19 04 55 31.3200 -97.3300 251.000 30.0 137.850 4.350 -999.990 -999.990 1.379 ..P WKT 2010 05 08 19 09 55 31.3200 -97.3300 251.000 122.0 142.469 4.220 -999.990 -999.990 1.425 ..P WKT 2010 05 08 19 14 55 31.3200 -97.3300 251.000 457.0 140.928 2.960 -999.990 -999.990 1.409 ..P WKT 2010 05 08 19 24 55 31.3200 -97.3300 251.000 30.0 136.365 2.870 -999.990 -999.990 1.364 ..P WKT 2010 05 08 19 29 55 31.3200 -97.3300 251.000 122.0 137.544 2.840 -999.990 -999.990 1.375 ..P WKT 2010 05 08 19 34 55 31.3200 -97.3300 251.000 457.0 144.887 3.280 -999.990 -999.990 1.449 ..P WKT 2010 05 08 19 39 55 31.3200 -97.3300 251.000 30.0 140.184 4.150 -999.990 -999.990 1.402 ..P WKT 2010 05 08 19 44 55 31.3200 -97.3300 251.000 122.0 144.445 3.010 -999.990 -999.990 1.444 ..P WKT 2010 05 08 19 49 55 31.3200 -97.3300 251.000 457.0 148.708 2.900 -999.990 -999.990 1.487 ..P WKT 2010 05 08 19 59 55 31.3200 -97.3300 251.000 30.0 144.304 2.620 -999.990 -999.990 1.443 ..P WKT 2010 05 08 20 04 55 31.3200 -97.3300 251.000 122.0 145.165 3.830 -999.990 -999.990 1.452 ..P WKT 2010 05 08 20 09 55 31.3200 -97.3300 251.000 457.0 146.866 3.690 -999.990 -999.990 1.469 ..P WKT 2010 05 08 20 14 55 31.3200 -97.3300 251.000 30.0 144.363 4.200 -999.990 -999.990 1.444 ..P WKT 2010 05 08 20 19 55 31.3200 -97.3300 251.000 122.0 145.504 3.490 -999.990 -999.990 1.455 ..P WKT 2010 05 08 20 24 55 31.3200 -97.3300 251.000 457.0 134.307 2.190 -999.990 -999.990 1.343 ..P WKT 2010 05 08 20 34 55 31.3200 -97.3300 251.000 30.0 139.012 2.640 -999.990 -999.990 1.390 ..P WKT 2010 05 08 20 39 55 31.3200 -97.3300 251.000 122.0 138.791 3.270 -999.990 -999.990 1.388 ..P WKT 2010 05 08 20 44 55 31.3200 -97.3300 251.000 457.0 137.026 3.430 -999.990 -999.990 1.370 ..P WKT 2010 05 08 20 49 55 31.3200 -97.3300 251.000 30.0 144.099 3.450 -999.990 -999.990 1.441 ..P WKT 2010 05 08 20 54 55 31.3200 -97.3300 251.000 122.0 145.702 2.330 -999.990 -999.990 1.457 ..P WKT 2010 05 08 20 59 55 31.3200 -97.3300 251.000 457.0 136.361 4.380 -999.990 -999.990 1.364 ..P WKT 2010 05 08 21 09 55 31.3200 -97.3300 251.000 30.0 143.355 2.580 -999.990 -999.990 1.434 ..P WKT 2010 05 08 21 14 55 31.3200 -97.3300 251.000 122.0 150.152 4.710 -999.990 -999.990 1.502 ..P WKT 2010 05 08 21 19 55 31.3200 -97.3300 251.000 457.0 140.105 2.770 -999.990 -999.990 1.401 ..P WKT 2010 05 08 21 24 55 31.3200 -97.3300 251.000 30.0 149.992 2.960 -999.990 -999.990 1.500 ..P WKT 2010 05 08 21 29 55 31.3200 -97.3300 251.000 122.0 144.296 3.280 -999.990 -999.990 1.443 ..P WKT 2010 05 08 21 34 55 31.3200 -97.3300 251.000 457.0 143.935 2.530 -999.990 -999.990 1.439 ..P WKT 2010 05 08 21 44 55 31.3200 -97.3300 251.000 30.0 146.803 3.180 -999.990 -999.990 1.468 ..P WKT 2010 05 08 21 49 55 31.3200 -97.3300 251.000 122.0 149.471 2.430 -999.990 -999.990 1.495 ..P WKT 2010 05 08 21 54 55 31.3200 -97.3300 251.000 457.0 141.042 2.200 -999.990 -999.990 1.410 ..P WKT 2010 05 08 21 59 55 31.3200 -97.3300 251.000 30.0 143.430 3.600 -999.990 -999.990 1.434 ..P WKT 2010 05 08 22 04 55 31.3200 -97.3300 251.000 122.0 146.520 4.430 -999.990 -999.990 1.465 ..P WKT 2010 05 08 22 09 55 31.3200 -97.3300 251.000 457.0 141.602 2.020 -999.990 -999.990 1.416 ..P WKT 2010 05 08 22 19 55 31.3200 -97.3300 251.000 30.0 145.034 2.300 -999.990 -999.990 1.450 ..P WKT 2010 05 08 22 24 55 31.3200 -97.3300 251.000 122.0 146.359 4.190 -999.990 -999.990 1.464 ..P WKT 2010 05 08 22 29 55 31.3200 -97.3300 251.000 457.0 139.109 3.990 -999.990 -999.990 1.391 ..P WKT 2010 05 08 22 34 55 31.3200 -97.3300 251.000 30.0 144.511 4.030 -999.990 -999.990 1.445 ..P WKT 2010 05 08 22 39 55 31.3200 -97.3300 251.000 122.0 153.288 3.800 -999.990 -999.990 1.533 ..P WKT 2010 05 08 22 44 55 31.3200 -97.3300 251.000 457.0 141.537 3.940 -999.990 -999.990 1.415 ..P WKT 2010 05 08 22 54 55 31.3200 -97.3300 251.000 30.0 146.036 4.400 -999.990 -999.990 1.460 ..P WKT 2010 05 08 22 59 55 31.3200 -97.3300 251.000 122.0 146.257 4.730 -999.990 -999.990 1.463 ..P WKT 2010 05 08 23 04 55 31.3200 -97.3300 251.000 457.0 151.823 3.520 -999.990 -999.990 1.518 ..P WKT 2010 05 08 23 09 55 31.3200 -97.3300 251.000 30.0 150.356 4.060 -999.990 -999.990 1.504 ..P WKT 2010 05 08 23 14 55 31.3200 -97.3300 251.000 122.0 150.296 4.120 -999.990 -999.990 1.503 ..P WKT 2010 05 08 23 19 55 31.3200 -97.3300 251.000 457.0 154.458 3.040 -999.990 -999.990 1.545 ..P WKT 2010 05 08 23 29 55 31.3200 -97.3300 251.000 30.0 148.613 3.150 -999.990 -999.990 1.486 ..P WKT 2010 05 08 23 34 55 31.3200 -97.3300 251.000 122.0 149.301 3.740 -999.990 -999.990 1.493 ..P WKT 2010 05 08 23 39 55 31.3200 -97.3300 251.000 457.0 146.612 3.800 -999.990 -999.990 1.466 ..P WKT 2010 05 08 23 44 55 31.3200 -97.3300 251.000 30.0 151.524 3.920 -999.990 -999.990 1.515 ..P WKT 2010 05 08 23 49 55 31.3200 -97.3300 251.000 122.0 156.156 3.620 -999.990 -999.990 1.562 ..P WKT 2010 05 09 00 09 55 31.3200 -97.3300 251.000 457.0 147.208 2.420 -999.990 -999.990 1.472 ..P WKT 2010 05 09 00 10 25 31.3200 -97.3300 251.000 457.0 152.559 2.060 -999.990 -999.990 1.526 ..P WKT 2010 05 09 00 10 55 31.3200 -97.3300 251.000 457.0 150.588 2.900 -999.990 -999.990 1.506 ..P WKT 2010 05 09 00 11 25 31.3200 -97.3300 251.000 457.0 144.391 3.310 -999.990 -999.990 1.444 ..P WKT 2010 05 09 00 11 55 31.3200 -97.3300 251.000 457.0 147.489 3.360 -999.990 -999.990 1.475 ..P WKT 2010 05 09 00 12 25 31.3200 -97.3300 251.000 457.0 146.362 3.290 -999.990 -999.990 1.464 ..P WKT 2010 05 09 00 12 55 31.3200 -97.3300 251.000 457.0 150.868 2.380 -999.990 -999.990 1.509 ..P WKT 2010 05 09 00 13 25 31.3200 -97.3300 251.000 457.0 149.742 3.380 -999.990 -999.990 1.497 ..P WKT 2010 05 09 00 13 55 31.3200 -97.3300 251.000 457.0 147.488 3.130 -999.990 -999.990 1.475 ..P WKT 2010 05 09 00 14 25 31.3200 -97.3300 251.000 457.0 145.235 2.580 -999.990 -999.990 1.452 ..P WKT 2010 05 09 00 14 55 31.3200 -97.3300 251.000 457.0 140.727 2.410 -999.990 -999.990 1.407 ..P WKT 2010 05 09 00 19 55 31.3200 -97.3300 251.000 30.0 159.317 3.000 -999.990 -999.990 1.593 ..P WKT 2010 05 09 00 24 55 31.3200 -97.3300 251.000 122.0 159.880 3.600 -999.990 -999.990 1.599 ..P WKT 2010 05 09 00 29 55 31.3200 -97.3300 251.000 457.0 146.076 2.690 -999.990 -999.990 1.461 ..P WKT 2010 05 09 00 34 55 31.3200 -97.3300 251.000 30.0 157.623 5.400 -999.990 -999.990 1.576 ..P WKT 2010 05 09 00 39 55 31.3200 -97.3300 251.000 122.0 155.932 2.130 -999.990 -999.990 1.559 ..P WKT 2010 05 09 00 44 55 31.3200 -97.3300 251.000 457.0 151.846 3.600 -999.990 -999.990 1.518 ..P WKT 2010 05 09 00 54 55 31.3200 -97.3300 251.000 30.0 164.541 3.350 -999.990 -999.990 1.645 ..P WKT 2010 05 09 00 59 55 31.3200 -97.3300 251.000 122.0 161.039 2.840 -999.990 -999.990 1.610 ..P WKT 2010 05 09 01 04 55 31.3200 -97.3300 251.000 457.0 147.112 4.380 -999.990 -999.990 1.471 ..P WKT 2010 05 09 01 09 55 31.3200 -97.3300 251.000 30.0 158.118 2.410 -999.990 -999.990 1.581 ..P WKT 2010 05 09 01 14 55 31.3200 -97.3300 251.000 122.0 156.306 2.250 -999.990 -999.990 1.563 ..P WKT 2010 05 09 01 19 55 31.3200 -97.3300 251.000 457.0 146.324 3.090 -999.990 -999.990 1.463 ..P WKT 2010 05 09 01 29 55 31.3200 -97.3300 251.000 30.0 166.021 2.470 -999.990 -999.990 1.660 ..P WKT 2010 05 09 01 34 55 31.3200 -97.3300 251.000 122.0 153.021 2.510 -999.990 -999.990 1.530 ..P WKT 2010 05 09 01 39 55 31.3200 -97.3300 251.000 457.0 145.232 2.600 -999.990 -999.990 1.452 ..P WKT 2010 05 09 01 44 55 31.3200 -97.3300 251.000 30.0 168.293 2.660 -999.990 -999.990 1.683 ..P WKT 2010 05 09 01 49 55 31.3200 -97.3300 251.000 122.0 153.038 2.810 -999.990 -999.990 1.530 ..P WKT 2010 05 09 01 54 55 31.3200 -97.3300 251.000 457.0 151.587 3.150 -999.990 -999.990 1.516 ..P WKT 2010 05 09 02 04 55 31.3200 -97.3300 251.000 30.0 168.148 3.380 -999.990 -999.990 1.681 ..P WKT 2010 05 09 02 09 55 31.3200 -97.3300 251.000 122.0 157.138 2.810 -999.990 -999.990 1.571 ..P WKT 2010 05 09 02 14 55 31.3200 -97.3300 251.000 457.0 151.340 2.840 -999.990 -999.990 1.513 ..P WKT 2010 05 09 02 19 55 31.3200 -97.3300 251.000 30.0 176.818 3.150 -999.990 -999.990 1.768 ..P WKT 2010 05 09 02 24 55 31.3200 -97.3300 251.000 122.0 157.074 5.070 -999.990 -999.990 1.571 ..P WKT 2010 05 09 02 29 55 31.3200 -97.3300 251.000 457.0 150.431 2.400 -999.990 -999.990 1.504 ..P WKT 2010 05 09 02 39 55 31.3200 -97.3300 251.000 30.0 171.521 5.500 -999.990 -999.990 1.715 ..P WKT 2010 05 09 02 44 55 31.3200 -97.3300 251.000 122.0 149.944 3.400 -999.990 -999.990 1.499 ..P WKT 2010 05 09 02 49 55 31.3200 -97.3300 251.000 457.0 143.583 3.700 -999.990 -999.990 1.436 ..P WKT 2010 05 09 02 54 55 31.3200 -97.3300 251.000 30.0 160.891 3.900 -999.990 -999.990 1.609 ..P WKT 2010 05 09 02 59 55 31.3200 -97.3300 251.000 122.0 155.093 2.980 -999.990 -999.990 1.551 ..P WKT 2010 05 09 03 04 55 31.3200 -97.3300 251.000 457.0 149.577 2.270 -999.990 -999.990 1.496 ..P WKT 2010 05 09 03 14 55 31.3200 -97.3300 251.000 30.0 160.443 3.300 -999.990 -999.990 1.604 ..P WKT 2010 05 09 03 19 55 31.3200 -97.3300 251.000 122.0 154.565 3.280 -999.990 -999.990 1.546 ..P WKT 2010 05 09 03 24 55 31.3200 -97.3300 251.000 457.0 144.459 3.230 -999.990 -999.990 1.445 ..P WKT 2010 05 09 03 29 55 31.3200 -97.3300 251.000 30.0 172.959 3.150 -999.990 -999.990 1.730 ..P WKT 2010 05 09 03 34 55 31.3200 -97.3300 251.000 122.0 143.692 3.700 -999.990 -999.990 1.437 ..P WKT 2010 05 09 03 39 55 31.3200 -97.3300 251.000 457.0 153.030 3.130 -999.990 -999.990 1.530 ..P WKT 2010 05 09 03 49 55 31.3200 -97.3300 251.000 30.0 175.370 2.650 -999.990 -999.990 1.754 ..P WKT 2010 05 09 03 54 55 31.3200 -97.3300 251.000 122.0 144.410 2.360 -999.990 -999.990 1.444 ..P WKT 2010 05 09 03 59 55 31.3200 -97.3300 251.000 457.0 150.085 2.960 -999.990 -999.990 1.501 ..P WKT 2010 05 09 04 04 55 31.3200 -97.3300 251.000 30.0 165.624 3.180 -999.990 -999.990 1.656 ..P WKT 2010 05 09 04 09 55 31.3200 -97.3300 251.000 122.0 150.164 3.060 -999.990 -999.990 1.502 ..P WKT 2010 05 09 04 14 55 31.3200 -97.3300 251.000 457.0 147.102 2.670 -999.990 -999.990 1.471 ..P WKT 2010 05 09 04 24 55 31.3200 -97.3300 251.000 30.0 161.292 3.130 -999.990 -999.990 1.613 ..P WKT 2010 05 09 04 29 55 31.3200 -97.3300 251.000 122.0 148.669 3.870 -999.990 -999.990 1.487 ..P WKT 2010 05 09 04 34 55 31.3200 -97.3300 251.000 457.0 144.077 4.410 -999.990 -999.990 1.441 ..P WKT 2010 05 09 04 39 55 31.3200 -97.3300 251.000 30.0 153.155 3.920 -999.990 -999.990 1.532 ..P WKT 2010 05 09 04 44 55 31.3200 -97.3300 251.000 122.0 152.792 4.630 -999.990 -999.990 1.528 ..P WKT 2010 05 09 04 49 55 31.3200 -97.3300 251.000 457.0 142.986 3.930 -999.990 -999.990 1.430 ..P WKT 2010 05 09 05 04 55 31.3200 -97.3300 251.000 30.0 150.899 4.740 -999.990 -999.990 1.509 ..P WKT 2010 05 09 05 09 55 31.3200 -97.3300 251.000 122.0 152.783 3.770 -999.990 -999.990 1.528 ..P WKT 2010 05 09 05 14 55 31.3200 -97.3300 251.000 457.0 145.789 4.040 -999.990 -999.990 1.458 ..P WKT 2010 05 09 05 19 55 31.3200 -97.3300 251.000 30.0 155.846 4.540 -999.990 -999.990 1.558 ..P WKT 2010 05 09 05 24 55 31.3200 -97.3300 251.000 122.0 154.065 3.590 -999.990 -999.990 1.541 ..P WKT 2010 05 09 05 29 55 31.3200 -97.3300 251.000 457.0 146.789 3.600 -999.990 -999.990 1.468 ..P WKT 2010 05 09 05 39 55 31.3200 -97.3300 251.000 30.0 156.603 4.450 -999.990 -999.990 1.566 ..P WKT 2010 05 09 05 44 55 31.3200 -97.3300 251.000 122.0 150.582 3.310 -999.990 -999.990 1.506 ..P WKT 2010 05 09 05 49 55 31.3200 -97.3300 251.000 457.0 147.239 2.930 -999.990 -999.990 1.472 ..P WKT 2010 05 09 05 54 55 31.3200 -97.3300 251.000 30.0 156.720 2.460 -999.990 -999.990 1.567 ..P WKT 2010 05 09 05 59 55 31.3200 -97.3300 251.000 122.0 155.632 2.530 -999.990 -999.990 1.556 ..P WKT 2010 05 09 06 04 55 31.3200 -97.3300 251.000 457.0 147.074 3.660 -999.990 -999.990 1.471 ..P WKT 2010 05 09 06 14 55 31.3200 -97.3300 251.000 30.0 151.158 2.610 -999.990 -999.990 1.512 ..P WKT 2010 05 09 06 19 55 31.3200 -97.3300 251.000 122.0 156.332 2.790 -999.990 -999.990 1.563 ..P WKT 2010 05 09 06 24 55 31.3200 -97.3300 251.000 457.0 148.679 2.250 -999.990 -999.990 1.487 ..P WKT 2010 05 09 06 29 55 31.3200 -97.3300 251.000 30.0 152.162 3.400 -999.990 -999.990 1.522 ..P WKT 2010 05 09 06 34 55 31.3200 -97.3300 251.000 122.0 152.543 2.340 -999.990 -999.990 1.525 ..P WKT 2010 05 09 06 39 55 31.3200 -97.3300 251.000 457.0 152.079 3.180 -999.990 -999.990 1.521 ..P WKT 2010 05 09 06 49 55 31.3200 -97.3300 251.000 30.0 149.277 2.810 -999.990 -999.990 1.493 ..P WKT 2010 05 09 06 54 55 31.3200 -97.3300 251.000 122.0 152.578 2.630 -999.990 -999.990 1.526 ..P WKT 2010 05 09 06 59 55 31.3200 -97.3300 251.000 457.0 141.783 3.280 -999.990 -999.990 1.418 ..P WKT 2010 05 09 07 04 55 31.3200 -97.3300 251.000 30.0 147.340 3.010 -999.990 -999.990 1.473 ..P WKT 2010 05 09 07 09 55 31.3200 -97.3300 251.000 122.0 157.407 2.690 -999.990 -999.990 1.574 ..P WKT 2010 05 09 07 14 55 31.3200 -97.3300 251.000 457.0 148.586 2.860 -999.990 -999.990 1.486 ..P WKT 2010 05 09 07 24 55 31.3200 -97.3300 251.000 30.0 155.229 2.290 -999.990 -999.990 1.552 ..P WKT 2010 05 09 07 29 55 31.3200 -97.3300 251.000 122.0 157.724 3.370 -999.990 -999.990 1.577 ..P WKT 2010 05 09 07 34 55 31.3200 -97.3300 251.000 457.0 144.432 3.000 -999.990 -999.990 1.444 ..P WKT 2010 05 09 07 39 55 31.3200 -97.3300 251.000 30.0 146.646 4.280 -999.990 -999.990 1.466 ..P WKT 2010 05 09 07 44 55 31.3200 -97.3300 251.000 122.0 150.269 3.150 -999.990 -999.990 1.503 ..P WKT 2010 05 09 07 49 55 31.3200 -97.3300 251.000 457.0 142.333 2.390 -999.990 -999.990 1.423 ..P WKT 2010 05 09 07 59 55 31.3200 -97.3300 251.000 30.0 155.622 3.180 -999.990 -999.990 1.556 ..P WKT 2010 05 09 08 04 55 31.3200 -97.3300 251.000 122.0 150.062 4.000 -999.990 -999.990 1.501 ..P WKT 2010 05 09 08 09 55 31.3200 -97.3300 251.000 457.0 148.450 4.000 -999.990 -999.990 1.484 ..P WKT 2010 05 09 08 14 55 31.3200 -97.3300 251.000 30.0 151.067 3.770 -999.990 -999.990 1.511 ..P WKT 2010 05 09 08 19 55 31.3200 -97.3300 251.000 122.0 153.966 2.720 -999.990 -999.990 1.540 ..P WKT 2010 05 09 08 24 55 31.3200 -97.3300 251.000 457.0 144.881 2.600 -999.990 -999.990 1.449 ..P WKT 2010 05 09 08 34 55 31.3200 -97.3300 251.000 30.0 152.613 4.170 -999.990 -999.990 1.526 ..P WKT 2010 05 09 08 39 55 31.3200 -97.3300 251.000 122.0 162.380 2.640 -999.990 -999.990 1.624 ..P WKT 2010 05 09 08 44 55 31.3200 -97.3300 251.000 457.0 145.782 3.080 -999.990 -999.990 1.458 ..P WKT 2010 05 09 08 49 55 31.3200 -97.3300 251.000 30.0 159.356 2.700 -999.990 -999.990 1.594 ..P WKT 2010 05 09 08 54 55 31.3200 -97.3300 251.000 122.0 154.602 2.810 -999.990 -999.990 1.546 ..P WKT 2010 05 09 08 59 55 31.3200 -97.3300 251.000 457.0 153.654 4.560 -999.990 -999.990 1.537 ..P WKT 2010 05 09 09 09 55 31.3200 -97.3300 251.000 30.0 155.263 2.960 -999.990 -999.990 1.553 ..P WKT 2010 05 09 09 14 55 31.3200 -97.3300 251.000 122.0 156.833 3.770 -999.990 -999.990 1.568 ..P WKT 2010 05 09 09 19 55 31.3200 -97.3300 251.000 457.0 144.303 2.980 -999.990 -999.990 1.443 ..P WKT 2010 05 09 09 24 55 31.3200 -97.3300 251.000 30.0 155.179 3.800 -999.990 -999.990 1.552 ..P WKT 2010 05 09 09 29 55 31.3200 -97.3300 251.000 122.0 158.158 3.760 -999.990 -999.990 1.582 ..P WKT 2010 05 09 09 34 55 31.3200 -97.3300 251.000 457.0 161.561 3.720 -999.990 -999.990 1.616 ..P WKT 2010 05 09 09 44 55 31.3200 -97.3300 251.000 30.0 152.092 3.790 -999.990 -999.990 1.521 ..P WKT 2010 05 09 09 49 55 31.3200 -97.3300 251.000 122.0 150.217 4.050 -999.990 -999.990 1.502 ..P WKT 2010 05 09 09 54 55 31.3200 -97.3300 251.000 457.0 148.906 3.800 -999.990 -999.990 1.489 ..P WKT 2010 05 09 09 59 55 31.3200 -97.3300 251.000 30.0 147.737 3.640 -999.990 -999.990 1.477 ..P WKT 2010 05 09 10 04 55 31.3200 -97.3300 251.000 122.0 152.348 3.320 -999.990 -999.990 1.523 ..P WKT 2010 05 09 10 09 55 31.3200 -97.3300 251.000 457.0 148.499 2.780 -999.990 -999.990 1.485 ..P WKT 2010 05 09 10 19 55 31.3200 -97.3300 251.000 30.0 147.691 2.540 -999.990 -999.990 1.477 ..P WKT 2010 05 09 10 24 55 31.3200 -97.3300 251.000 122.0 148.757 3.450 -999.990 -999.990 1.488 ..P WKT 2010 05 09 10 29 55 31.3200 -97.3300 251.000 457.0 153.490 3.220 -999.990 -999.990 1.535 ..P WKT 2010 05 09 10 34 55 31.3200 -97.3300 251.000 30.0 152.865 3.240 -999.990 -999.990 1.529 ..P WKT 2010 05 09 10 39 55 31.3200 -97.3300 251.000 122.0 146.316 2.490 -999.990 -999.990 1.463 ..P WKT 2010 05 09 10 44 55 31.3200 -97.3300 251.000 457.0 146.254 2.380 -999.990 -999.990 1.463 ..P WKT 2010 05 09 10 54 55 31.3200 -97.3300 251.000 30.0 148.810 2.360 -999.990 -999.990 1.488 ..P WKT 2010 05 09 10 59 55 31.3200 -97.3300 251.000 122.0 152.556 3.390 -999.990 -999.990 1.526 ..P WKT 2010 05 09 11 04 55 31.3200 -97.3300 251.000 457.0 141.353 2.640 -999.990 -999.990 1.414 ..P WKT 2010 05 09 11 09 55 31.3200 -97.3300 251.000 30.0 147.637 2.330 -999.990 -999.990 1.476 ..P WKT 2010 05 09 11 14 55 31.3200 -97.3300 251.000 122.0 144.614 3.750 -999.990 -999.990 1.446 ..P WKT 2010 05 09 11 19 55 31.3200 -97.3300 251.000 457.0 148.078 1.990 -999.990 -999.990 1.481 ..P WKT 2010 05 09 11 29 55 31.3200 -97.3300 251.000 30.0 147.980 3.250 -999.990 -999.990 1.480 ..P WKT 2010 05 09 11 34 55 31.3200 -97.3300 251.000 122.0 154.854 2.360 -999.990 -999.990 1.549 ..P WKT 2010 05 09 11 39 55 31.3200 -97.3300 251.000 457.0 150.164 2.840 -999.990 -999.990 1.502 ..P WKT 2010 05 09 11 44 55 31.3200 -97.3300 251.000 30.0 142.934 3.020 -999.990 -999.990 1.429 ..P WKT 2010 05 09 11 49 55 31.3200 -97.3300 251.000 122.0 154.040 3.020 -999.990 -999.990 1.540 ..P WKT 2010 05 09 12 09 55 31.3200 -97.3300 251.000 457.0 151.371 3.550 -999.990 -999.990 1.514 ..P WKT 2010 05 09 12 10 25 31.3200 -97.3300 251.000 457.0 151.385 3.390 -999.990 -999.990 1.514 ..P WKT 2010 05 09 12 10 55 31.3200 -97.3300 251.000 457.0 153.656 3.500 -999.990 -999.990 1.537 ..P WKT 2010 05 09 12 11 25 31.3200 -97.3300 251.000 457.0 152.260 3.220 -999.990 -999.990 1.523 ..P WKT 2010 05 09 12 11 55 31.3200 -97.3300 251.000 457.0 155.376 3.480 -999.990 -999.990 1.554 ..P WKT 2010 05 09 12 12 25 31.3200 -97.3300 251.000 457.0 153.416 3.870 -999.990 -999.990 1.534 ..P WKT 2010 05 09 12 12 55 31.3200 -97.3300 251.000 457.0 152.020 3.220 -999.990 -999.990 1.520 ..P WKT 2010 05 09 12 13 25 31.3200 -97.3300 251.000 457.0 150.060 3.220 -999.990 -999.990 1.501 ..P WKT 2010 05 09 12 13 55 31.3200 -97.3300 251.000 457.0 157.124 3.210 -999.990 -999.990 1.571 ..P WKT 2010 05 09 12 14 25 31.3200 -97.3300 251.000 457.0 148.396 3.180 -999.990 -999.990 1.484 ..P WKT 2010 05 09 12 14 55 31.3200 -97.3300 251.000 457.0 152.640 3.260 -999.990 -999.990 1.526 ..P WKT 2010 05 09 12 19 55 31.3200 -97.3300 251.000 30.0 151.370 3.150 -999.990 -999.990 1.514 ..P WKT 2010 05 09 12 24 55 31.3200 -97.3300 251.000 122.0 151.510 3.590 -999.990 -999.990 1.515 ..P WKT 2010 05 09 12 29 55 31.3200 -97.3300 251.000 457.0 155.738 3.300 -999.990 -999.990 1.557 ..P WKT 2010 05 09 12 34 55 31.3200 -97.3300 251.000 30.0 150.663 2.980 -999.990 -999.990 1.507 ..P WKT 2010 05 09 12 39 55 31.3200 -97.3300 251.000 122.0 154.891 4.860 -999.990 -999.990 1.549 ..P WKT 2010 05 09 12 44 55 31.3200 -97.3300 251.000 457.0 156.158 3.310 -999.990 -999.990 1.562 ..P WKT 2010 05 09 12 54 55 31.3200 -97.3300 251.000 30.0 153.302 2.900 -999.990 -999.990 1.533 ..P WKT 2010 05 09 12 59 55 31.3200 -97.3300 251.000 122.0 148.897 4.040 -999.990 -999.990 1.489 ..P WKT 2010 05 09 13 04 55 31.3200 -97.3300 251.000 457.0 144.775 4.310 -999.990 -999.990 1.448 ..P WKT 2010 05 09 13 09 55 31.3200 -97.3300 251.000 30.0 147.416 4.920 -999.990 -999.990 1.474 ..P WKT 2010 05 09 13 14 55 31.3200 -97.3300 251.000 122.0 151.888 4.280 -999.990 -999.990 1.519 ..P WKT 2010 05 09 13 19 55 31.3200 -97.3300 251.000 457.0 155.231 3.810 -999.990 -999.990 1.552 ..P WKT 2010 05 09 13 29 55 31.3200 -97.3300 251.000 30.0 144.415 3.680 -999.990 -999.990 1.444 ..P WKT 2010 05 09 13 34 55 31.3200 -97.3300 251.000 122.0 143.916 3.930 -999.990 -999.990 1.439 ..P WKT 2010 05 09 13 39 55 31.3200 -97.3300 251.000 457.0 158.202 4.120 -999.990 -999.990 1.582 ..P WKT 2010 05 09 13 44 55 31.3200 -97.3300 251.000 30.0 146.862 3.340 -999.990 -999.990 1.469 ..P WKT 2010 05 09 13 49 55 31.3200 -97.3300 251.000 122.0 137.775 3.540 -999.990 -999.990 1.378 ..P WKT 2010 05 09 13 54 55 31.3200 -97.3300 251.000 457.0 142.627 4.210 -999.990 -999.990 1.426 ..P WKT 2010 05 09 14 04 55 31.3200 -97.3300 251.000 30.0 146.798 2.850 -999.990 -999.990 1.468 ..P WKT 2010 05 09 14 09 55 31.3200 -97.3300 251.000 122.0 148.370 3.860 -999.990 -999.990 1.484 ..P WKT 2010 05 09 14 14 55 31.3200 -97.3300 251.000 457.0 159.229 6.110 -999.990 -999.990 1.592 ..P WKT 2010 05 09 14 19 55 31.3200 -97.3300 251.000 30.0 147.856 3.700 -999.990 -999.990 1.479 ..P WKT 2010 05 09 14 24 55 31.3200 -97.3300 251.000 122.0 143.940 3.140 -999.990 -999.990 1.439 ..P WKT 2010 05 09 14 29 55 31.3200 -97.3300 251.000 457.0 158.876 4.170 -999.990 -999.990 1.589 ..P WKT 2010 05 09 14 39 55 31.3200 -97.3300 251.000 30.0 145.662 2.890 -999.990 -999.990 1.457 ..P WKT 2010 05 09 14 44 55 31.3200 -97.3300 251.000 122.0 148.740 3.370 -999.990 -999.990 1.487 ..P WKT 2010 05 09 14 49 55 31.3200 -97.3300 251.000 457.0 148.724 4.080 -999.990 -999.990 1.487 ..P WKT 2010 05 09 14 54 55 31.3200 -97.3300 251.000 30.0 148.145 2.870 -999.990 -999.990 1.481 ..P WKT 2010 05 09 14 59 55 31.3200 -97.3300 251.000 122.0 148.410 2.690 -999.990 -999.990 1.484 ..P WKT 2010 05 09 15 04 55 31.3200 -97.3300 251.000 457.0 151.768 2.060 -999.990 -999.990 1.518 ..P WKT 2010 05 09 15 14 55 31.3200 -97.3300 251.000 30.0 148.282 2.140 -999.990 -999.990 1.483 ..P WKT 2010 05 09 15 19 55 31.3200 -97.3300 251.000 122.0 149.028 5.820 -999.990 -999.990 1.490 ..P WKT 2010 05 09 15 24 55 31.3200 -97.3300 251.000 457.0 153.992 4.180 -999.990 -999.990 1.540 ..P WKT 2010 05 09 15 29 55 31.3200 -97.3300 251.000 30.0 147.150 5.950 -999.990 -999.990 1.472 ..P WKT 2010 05 09 15 34 55 31.3200 -97.3300 251.000 122.0 154.360 5.130 -999.990 -999.990 1.544 ..P WKT 2010 05 09 15 39 55 31.3200 -97.3300 251.000 457.0 161.851 4.080 -999.990 -999.990 1.619 ..P WKT 2010 05 09 15 49 55 31.3200 -97.3300 251.000 30.0 162.760 3.180 -999.990 -999.990 1.628 ..P WKT 2010 05 09 15 54 55 31.3200 -97.3300 251.000 122.0 159.832 4.580 -999.990 -999.990 1.598 ..P WKT 2010 05 09 15 59 55 31.3200 -97.3300 251.000 457.0 153.816 5.520 -999.990 -999.990 1.538 ..P WKT 2010 05 09 16 04 55 31.3200 -97.3300 251.000 30.0 158.474 5.220 -999.990 -999.990 1.585 ..P WKT 2010 05 09 16 09 55 31.3200 -97.3300 251.000 122.0 157.795 3.990 -999.990 -999.990 1.578 ..P WKT 2010 05 09 16 14 55 31.3200 -97.3300 251.000 457.0 155.432 3.700 -999.990 -999.990 1.554 ..P WKT 2010 05 09 16 24 55 31.3200 -97.3300 251.000 30.0 148.338 4.050 -999.990 -999.990 1.483 ..P WKT 2010 05 09 16 29 55 31.3200 -97.3300 251.000 122.0 149.646 4.830 -999.990 -999.990 1.496 ..P WKT 2010 05 09 16 34 55 31.3200 -97.3300 251.000 457.0 148.005 5.490 -999.990 -999.990 1.480 ..P WKT 2010 05 09 16 39 55 31.3200 -97.3300 251.000 30.0 153.523 3.970 -999.990 -999.990 1.535 ..P WKT 2010 05 09 16 44 55 31.3200 -97.3300 251.000 122.0 155.110 5.170 -999.990 -999.990 1.551 ..P WKT 2010 05 09 16 49 55 31.3200 -97.3300 251.000 457.0 151.225 3.910 -999.990 -999.990 1.512 ..P WKT 2010 05 09 17 04 55 31.3200 -97.3300 251.000 30.0 153.936 3.200 -999.990 -999.990 1.539 ..P WKT 2010 05 09 17 09 55 31.3200 -97.3300 251.000 122.0 157.585 3.190 -999.990 -999.990 1.576 ..P WKT 2010 05 09 17 14 55 31.3200 -97.3300 251.000 457.0 152.816 3.340 -999.990 -999.990 1.528 ..P WKT 2010 05 09 17 19 55 31.3200 -97.3300 251.000 30.0 152.257 3.420 -999.990 -999.990 1.523 ..P WKT 2010 05 09 17 24 55 31.3200 -97.3300 251.000 122.0 153.520 3.450 -999.990 -999.990 1.535 ..P WKT 2010 05 09 17 29 55 31.3200 -97.3300 251.000 457.0 151.698 4.060 -999.990 -999.990 1.517 ..P WKT 2010 05 09 17 39 55 31.3200 -97.3300 251.000 30.0 155.108 3.720 -999.990 -999.990 1.551 ..P WKT 2010 05 09 17 44 55 31.3200 -97.3300 251.000 122.0 159.638 3.860 -999.990 -999.990 1.596 ..P WKT 2010 05 09 17 49 55 31.3200 -97.3300 251.000 457.0 150.288 3.990 -999.990 -999.990 1.503 ..P WKT 2010 05 09 17 54 55 31.3200 -97.3300 251.000 30.0 155.099 4.070 -999.990 -999.990 1.551 ..P WKT 2010 05 09 17 59 55 31.3200 -97.3300 251.000 122.0 147.713 5.780 -999.990 -999.990 1.477 ..P WKT 2010 05 09 18 04 55 31.3200 -97.3300 251.000 457.0 150.280 4.150 -999.990 -999.990 1.503 ..P WKT 2010 05 09 18 14 55 31.3200 -97.3300 251.000 30.0 155.893 3.850 -999.990 -999.990 1.559 ..P WKT 2010 05 09 18 19 55 31.3200 -97.3300 251.000 122.0 153.334 3.610 -999.990 -999.990 1.533 ..P WKT 2010 05 09 18 24 55 31.3200 -97.3300 251.000 457.0 156.240 3.280 -999.990 -999.990 1.562 ..P WKT 2010 05 09 18 29 55 31.3200 -97.3300 251.000 30.0 152.701 5.770 -999.990 -999.990 1.527 ..P WKT 2010 05 09 18 34 55 31.3200 -97.3300 251.000 122.0 147.201 2.930 -999.990 -999.990 1.472 ..P WKT 2010 05 09 18 39 55 31.3200 -97.3300 251.000 457.0 152.908 3.270 -999.990 -999.990 1.529 ..P WKT 2010 05 09 18 49 55 31.3200 -97.3300 251.000 30.0 150.795 2.920 -999.990 -999.990 1.508 ..P WKT 2010 05 09 18 54 55 31.3200 -97.3300 251.000 122.0 154.460 2.710 -999.990 -999.990 1.545 ..P WKT 2010 05 09 18 59 55 31.3200 -97.3300 251.000 457.0 156.723 2.710 -999.990 -999.990 1.567 ..P WKT 2010 05 09 19 04 55 31.3200 -97.3300 251.000 30.0 153.106 5.210 -999.990 -999.990 1.531 ..P WKT 2010 05 09 19 09 55 31.3200 -97.3300 251.000 122.0 154.530 4.350 -999.990 -999.990 1.545 ..P WKT 2010 05 09 19 14 55 31.3200 -97.3300 251.000 457.0 151.474 2.620 -999.990 -999.990 1.515 ..P WKT 2010 05 09 19 24 55 31.3200 -97.3300 251.000 30.0 156.799 2.880 -999.990 -999.990 1.568 ..P WKT 2010 05 09 19 29 55 31.3200 -97.3300 251.000 122.0 155.104 3.650 -999.990 -999.990 1.551 ..P WKT 2010 05 09 19 34 55 31.3200 -97.3300 251.000 457.0 156.206 3.030 -999.990 -999.990 1.562 ..P WKT 2010 05 09 19 39 55 31.3200 -97.3300 251.000 30.0 155.910 2.820 -999.990 -999.990 1.559 ..P WKT 2010 05 09 19 44 55 31.3200 -97.3300 251.000 122.0 154.774 4.110 -999.990 -999.990 1.548 ..P WKT 2010 05 09 19 49 55 31.3200 -97.3300 251.000 457.0 150.840 3.620 -999.990 -999.990 1.508 ..P WKT 2010 05 09 19 59 55 31.3200 -97.3300 251.000 30.0 152.066 3.590 -999.990 -999.990 1.521 ..P WKT 2010 05 09 20 04 55 31.3200 -97.3300 251.000 122.0 150.511 2.700 -999.990 -999.990 1.505 ..P WKT 2010 05 09 20 09 55 31.3200 -97.3300 251.000 457.0 151.055 2.680 -999.990 -999.990 1.511 ..P WKT 2010 05 09 20 14 55 31.3200 -97.3300 251.000 30.0 149.081 2.540 -999.990 -999.990 1.491 ..P WKT 2010 05 09 20 19 55 31.3200 -97.3300 251.000 122.0 154.518 5.020 -999.990 -999.990 1.545 ..P WKT 2010 05 09 20 24 55 31.3200 -97.3300 251.000 457.0 151.286 2.460 -999.990 -999.990 1.513 ..P WKT 2010 05 09 20 34 55 31.3200 -97.3300 251.000 30.0 153.470 2.360 -999.990 -999.990 1.535 ..P WKT 2010 05 09 20 39 55 31.3200 -97.3300 251.000 122.0 153.573 3.070 -999.990 -999.990 1.536 ..P WKT 2010 05 09 20 44 55 31.3200 -97.3300 251.000 457.0 148.645 3.700 -999.990 -999.990 1.486 ..P WKT 2010 05 09 20 49 55 31.3200 -97.3300 251.000 30.0 149.447 3.250 -999.990 -999.990 1.494 ..P WKT 2010 05 09 20 54 55 31.3200 -97.3300 251.000 122.0 152.486 3.170 -999.990 -999.990 1.525 ..P WKT 2010 05 09 20 59 55 31.3200 -97.3300 251.000 457.0 150.913 4.660 -999.990 -999.990 1.509 ..P WKT 2010 05 09 21 09 55 31.3200 -97.3300 251.000 30.0 155.610 3.350 -999.990 -999.990 1.556 ..P WKT 2010 05 09 21 14 55 31.3200 -97.3300 251.000 122.0 159.785 3.280 -999.990 -999.990 1.598 ..P WKT 2010 05 09 21 19 55 31.3200 -97.3300 251.000 457.0 160.327 3.570 -999.990 -999.990 1.603 ..P WKT 2010 05 09 21 24 55 31.3200 -97.3300 251.000 30.0 156.120 5.390 -999.990 -999.990 1.561 ..P WKT 2010 05 09 21 29 55 31.3200 -97.3300 251.000 122.0 156.941 4.390 -999.990 -999.990 1.569 ..P WKT 2010 05 09 21 34 55 31.3200 -97.3300 251.000 457.0 159.438 3.530 -999.990 -999.990 1.594 ..P WKT 2010 05 09 21 44 55 31.3200 -97.3300 251.000 30.0 159.424 4.170 -999.990 -999.990 1.594 ..P WKT 2010 05 09 21 49 55 31.3200 -97.3300 251.000 122.0 161.102 3.180 -999.990 -999.990 1.611 ..P WKT 2010 05 09 21 54 55 31.3200 -97.3300 251.000 457.0 154.823 3.220 -999.990 -999.990 1.548 ..P WKT 2010 05 09 21 59 55 31.3200 -97.3300 251.000 30.0 157.897 5.640 -999.990 -999.990 1.579 ..P WKT 2010 05 09 22 04 55 31.3200 -97.3300 251.000 122.0 151.899 3.590 -999.990 -999.990 1.519 ..P WKT 2010 05 09 22 09 55 31.3200 -97.3300 251.000 457.0 159.160 2.810 -999.990 -999.990 1.592 ..P WKT 2010 05 09 22 19 55 31.3200 -97.3300 251.000 30.0 151.950 3.130 -999.990 -999.990 1.519 ..P WKT 2010 05 09 22 24 55 31.3200 -97.3300 251.000 122.0 155.481 3.110 -999.990 -999.990 1.555 ..P WKT 2010 05 09 22 29 55 31.3200 -97.3300 251.000 457.0 163.757 3.320 -999.990 -999.990 1.638 ..P WKT 2010 05 09 22 34 55 31.3200 -97.3300 251.000 30.0 155.847 3.650 -999.990 -999.990 1.558 ..P WKT 2010 05 09 22 39 55 31.3200 -97.3300 251.000 122.0 155.193 3.620 -999.990 -999.990 1.552 ..P WKT 2010 05 09 22 44 55 31.3200 -97.3300 251.000 457.0 166.813 3.760 -999.990 -999.990 1.668 ..P WKT 2010 05 09 22 54 55 31.3200 -97.3300 251.000 30.0 151.438 2.810 -999.990 -999.990 1.514 ..P WKT 2010 05 09 22 59 55 31.3200 -97.3300 251.000 122.0 158.752 3.130 -999.990 -999.990 1.588 ..P WKT 2010 05 09 23 04 55 31.3200 -97.3300 251.000 457.0 161.324 4.270 -999.990 -999.990 1.613 ..P WKT 2010 05 09 23 09 55 31.3200 -97.3300 251.000 30.0 147.445 3.150 -999.990 -999.990 1.474 ..P WKT 2010 05 09 23 14 55 31.3200 -97.3300 251.000 122.0 150.855 3.440 -999.990 -999.990 1.509 ..P WKT 2010 05 09 23 19 55 31.3200 -97.3300 251.000 457.0 162.070 3.250 -999.990 -999.990 1.621 ..P WKT 2010 05 09 23 29 55 31.3200 -97.3300 251.000 30.0 153.788 3.830 -999.990 -999.990 1.538 ..P WKT 2010 05 09 23 34 55 31.3200 -97.3300 251.000 122.0 154.085 2.940 -999.990 -999.990 1.541 ..P WKT 2010 05 09 23 39 55 31.3200 -97.3300 251.000 457.0 161.629 3.500 -999.990 -999.990 1.616 ..P WKT 2010 05 09 23 44 55 31.3200 -97.3300 251.000 30.0 153.008 4.470 -999.990 -999.990 1.530 ..P WKT 2010 05 09 23 49 55 31.3200 -97.3300 251.000 122.0 155.255 2.910 -999.990 -999.990 1.553 ..P WKT 2010 05 10 00 09 55 31.3200 -97.3300 251.000 457.0 183.686 2.880 -999.990 -999.990 1.837 ..P WKT 2010 05 10 00 10 25 31.3200 -97.3300 251.000 457.0 176.744 2.980 -999.990 -999.990 1.767 ..P WKT 2010 05 10 00 10 55 31.3200 -97.3300 251.000 457.0 177.602 3.420 -999.990 -999.990 1.776 ..P WKT 2010 05 10 00 11 25 31.3200 -97.3300 251.000 457.0 176.649 4.890 -999.990 -999.990 1.766 ..P WKT 2010 05 10 00 11 55 31.3200 -97.3300 251.000 457.0 167.618 3.380 -999.990 -999.990 1.676 ..P WKT 2010 05 10 00 12 25 31.3200 -97.3300 251.000 457.0 175.580 4.100 -999.990 -999.990 1.756 ..P WKT 2010 05 10 00 12 55 31.3200 -97.3300 251.000 457.0 178.946 2.810 -999.990 -999.990 1.789 ..P WKT 2010 05 10 00 13 25 31.3200 -97.3300 251.000 457.0 177.297 3.850 -999.990 -999.990 1.773 ..P WKT 2010 05 10 00 13 55 31.3200 -97.3300 251.000 457.0 185.260 4.220 -999.990 -999.990 1.853 ..P WKT 2010 05 10 00 14 25 31.3200 -97.3300 251.000 457.0 177.760 3.100 -999.990 -999.990 1.778 ..P WKT 2010 05 10 00 14 55 31.3200 -97.3300 251.000 457.0 184.051 4.010 -999.990 -999.990 1.841 ..P WKT 2010 05 10 00 19 55 31.3200 -97.3300 251.000 30.0 152.378 3.410 -999.990 -999.990 1.524 ..P WKT 2010 05 10 00 24 55 31.3200 -97.3300 251.000 122.0 157.898 3.680 -999.990 -999.990 1.579 ..P WKT 2010 05 10 00 29 55 31.3200 -97.3300 251.000 457.0 183.754 3.500 -999.990 -999.990 1.838 ..P WKT 2010 05 10 00 34 55 31.3200 -97.3300 251.000 30.0 159.465 3.480 -999.990 -999.990 1.595 ..P WKT 2010 05 10 00 39 55 31.3200 -97.3300 251.000 122.0 153.283 3.470 -999.990 -999.990 1.533 ..P WKT 2010 05 10 00 44 55 31.3200 -97.3300 251.000 457.0 185.825 3.330 -999.990 -999.990 1.858 ..P WKT 2010 05 10 00 54 55 31.3200 -97.3300 251.000 30.0 154.943 2.990 -999.990 -999.990 1.549 ..P WKT 2010 05 10 00 59 55 31.3200 -97.3300 251.000 122.0 155.455 3.910 -999.990 -999.990 1.555 ..P WKT 2010 05 10 01 04 55 31.3200 -97.3300 251.000 457.0 190.230 3.360 -999.990 -999.990 1.902 ..P WKT 2010 05 10 01 09 55 31.3200 -97.3300 251.000 30.0 156.617 3.290 -999.990 -999.990 1.566 ..P WKT 2010 05 10 01 14 55 31.3200 -97.3300 251.000 122.0 162.699 3.850 -999.990 -999.990 1.627 ..P WKT 2010 05 10 01 19 55 31.3200 -97.3300 251.000 457.0 185.357 2.670 -999.990 -999.990 1.854 ..P WKT 2010 05 10 01 29 55 31.3200 -97.3300 251.000 30.0 155.638 2.760 -999.990 -999.990 1.556 ..P WKT 2010 05 10 01 34 55 31.3200 -97.3300 251.000 122.0 157.581 3.210 -999.990 -999.990 1.576 ..P WKT 2010 05 10 01 39 55 31.3200 -97.3300 251.000 457.0 179.860 4.450 -999.990 -999.990 1.799 ..P WKT 2010 05 10 01 44 55 31.3200 -97.3300 251.000 30.0 150.884 4.670 -999.990 -999.990 1.509 ..P WKT 2010 05 10 01 49 55 31.3200 -97.3300 251.000 122.0 159.514 4.010 -999.990 -999.990 1.595 ..P WKT 2010 05 10 01 54 55 31.3200 -97.3300 251.000 457.0 167.585 3.470 -999.990 -999.990 1.676 ..P WKT 2010 05 10 02 04 55 31.3200 -97.3300 251.000 30.0 156.272 5.430 -999.990 -999.990 1.563 ..P WKT 2010 05 10 02 09 55 31.3200 -97.3300 251.000 122.0 160.563 3.910 -999.990 -999.990 1.606 ..P WKT 2010 05 10 02 14 55 31.3200 -97.3300 251.000 457.0 165.273 4.120 -999.990 -999.990 1.653 ..P WKT 2010 05 10 02 19 55 31.3200 -97.3300 251.000 30.0 164.690 3.570 -999.990 -999.990 1.647 ..P WKT 2010 05 10 02 24 55 31.3200 -97.3300 251.000 122.0 159.928 3.450 -999.990 -999.990 1.599 ..P WKT 2010 05 10 02 29 55 31.3200 -97.3300 251.000 457.0 151.825 3.720 -999.990 -999.990 1.518 ..P WKT 2010 05 10 02 39 55 31.3200 -97.3300 251.000 30.0 162.854 3.230 -999.990 -999.990 1.629 ..P WKT 2010 05 10 02 44 55 31.3200 -97.3300 251.000 122.0 165.832 3.330 -999.990 -999.990 1.658 ..P WKT 2010 05 10 02 49 55 31.3200 -97.3300 251.000 457.0 157.948 4.180 -999.990 -999.990 1.579 ..P WKT 2010 05 10 02 54 55 31.3200 -97.3300 251.000 30.0 167.053 3.020 -999.990 -999.990 1.671 ..P WKT 2010 05 10 02 59 55 31.3200 -97.3300 251.000 122.0 161.398 3.170 -999.990 -999.990 1.614 ..P WKT 2010 05 10 03 04 55 31.3200 -97.3300 251.000 457.0 144.880 2.800 -999.990 -999.990 1.449 ..P WKT 2010 05 10 03 14 55 31.3200 -97.3300 251.000 30.0 159.669 3.410 -999.990 -999.990 1.597 ..P WKT 2010 05 10 03 19 55 31.3200 -97.3300 251.000 122.0 170.087 2.620 -999.990 -999.990 1.701 ..P WKT 2010 05 10 03 24 55 31.3200 -97.3300 251.000 457.0 135.108 3.780 -999.990 -999.990 1.351 ..P WKT 2010 05 10 03 29 55 31.3200 -97.3300 251.000 30.0 167.528 3.980 -999.990 -999.990 1.675 ..P WKT 2010 05 10 03 34 55 31.3200 -97.3300 251.000 122.0 164.856 4.780 -999.990 -999.990 1.649 ..P WKT 2010 05 10 03 39 55 31.3200 -97.3300 251.000 457.0 124.587 2.830 -999.990 -999.990 1.246 ..P WKT 2010 05 10 03 49 55 31.3200 -97.3300 251.000 30.0 160.363 3.040 -999.990 -999.990 1.604 ..P WKT 2010 05 10 03 54 55 31.3200 -97.3300 251.000 122.0 170.123 3.650 -999.990 -999.990 1.701 ..P WKT 2010 05 10 03 59 55 31.3200 -97.3300 251.000 457.0 120.287 3.500 -999.990 -999.990 1.203 ..P WKT 2010 05 10 04 04 55 31.3200 -97.3300 251.000 30.0 164.024 3.480 -999.990 -999.990 1.640 ..P WKT 2010 05 10 04 09 55 31.3200 -97.3300 251.000 122.0 174.482 4.660 -999.990 -999.990 1.745 ..P WKT 2010 05 10 04 14 55 31.3200 -97.3300 251.000 457.0 126.596 3.940 -999.990 -999.990 1.266 ..P WKT 2010 05 10 04 24 55 31.3200 -97.3300 251.000 30.0 167.422 4.440 -999.990 -999.990 1.674 ..P WKT 2010 05 10 04 29 55 31.3200 -97.3300 251.000 122.0 183.031 3.750 -999.990 -999.990 1.830 ..P WKT 2010 05 10 04 34 55 31.3200 -97.3300 251.000 457.0 124.564 3.700 -999.990 -999.990 1.246 ..P WKT 2010 05 10 04 39 55 31.3200 -97.3300 251.000 30.0 176.235 4.520 -999.990 -999.990 1.762 ..P WKT 2010 05 10 04 44 55 31.3200 -97.3300 251.000 122.0 180.565 3.920 -999.990 -999.990 1.806 ..P WKT 2010 05 10 04 49 55 31.3200 -97.3300 251.000 457.0 123.214 3.690 -999.990 -999.990 1.232 ..P WKT 2010 05 10 05 04 55 31.3200 -97.3300 251.000 30.0 179.849 3.640 -999.990 -999.990 1.798 ..P WKT 2010 05 10 05 09 55 31.3200 -97.3300 251.000 122.0 180.800 4.600 -999.990 -999.990 1.808 ..P WKT 2010 05 10 05 14 55 31.3200 -97.3300 251.000 457.0 119.376 3.500 -999.990 -999.990 1.194 ..P WKT 2010 05 10 05 19 55 31.3200 -97.3300 251.000 30.0 181.727 4.290 -999.990 -999.990 1.817 ..P WKT 2010 05 10 05 24 55 31.3200 -97.3300 251.000 122.0 183.095 3.570 -999.990 -999.990 1.831 ..P WKT 2010 05 10 05 29 55 31.3200 -97.3300 251.000 457.0 125.850 3.200 -999.990 -999.990 1.258 ..P WKT 2010 05 10 05 39 55 31.3200 -97.3300 251.000 30.0 183.937 3.910 -999.990 -999.990 1.839 ..P WKT 2010 05 10 05 44 55 31.3200 -97.3300 251.000 122.0 182.737 3.870 -999.990 -999.990 1.827 ..P WKT 2010 05 10 05 49 55 31.3200 -97.3300 251.000 457.0 124.039 3.690 -999.990 -999.990 1.240 ..P WKT 2010 05 10 05 54 55 31.3200 -97.3300 251.000 30.0 181.870 3.900 -999.990 -999.990 1.819 ..P WKT 2010 05 10 05 59 55 31.3200 -97.3300 251.000 122.0 173.292 4.100 -999.990 -999.990 1.733 ..P WKT 2010 05 10 06 04 55 31.3200 -97.3300 251.000 457.0 115.430 3.980 -999.990 -999.990 1.154 ..P WKT 2010 05 10 06 14 55 31.3200 -97.3300 251.000 30.0 181.567 3.880 -999.990 -999.990 1.816 ..P WKT 2010 05 10 06 19 55 31.3200 -97.3300 251.000 122.0 172.332 3.740 -999.990 -999.990 1.723 ..P WKT 2010 05 10 06 24 55 31.3200 -97.3300 251.000 457.0 107.969 3.570 -999.990 -999.990 1.080 ..P WKT 2010 05 10 06 29 55 31.3200 -97.3300 251.000 30.0 175.303 4.310 -999.990 -999.990 1.753 ..P WKT 2010 05 10 06 34 55 31.3200 -97.3300 251.000 122.0 159.109 3.780 -999.990 -999.990 1.591 ..P WKT 2010 05 10 06 39 55 31.3200 -97.3300 251.000 457.0 107.833 4.160 -999.990 -999.990 1.078 ..P WKT 2010 05 10 06 49 55 31.3200 -97.3300 251.000 30.0 168.795 4.380 -999.990 -999.990 1.688 ..P WKT 2010 05 10 06 54 55 31.3200 -97.3300 251.000 122.0 152.124 3.800 -999.990 -999.990 1.521 ..P WKT 2010 05 10 06 59 55 31.3200 -97.3300 251.000 457.0 107.055 4.370 -999.990 -999.990 1.071 ..P WKT 2010 05 10 07 04 55 31.3200 -97.3300 251.000 30.0 180.589 6.120 -999.990 -999.990 1.806 ..P WKT 2010 05 10 07 09 55 31.3200 -97.3300 251.000 122.0 152.504 3.260 -999.990 -999.990 1.525 ..P WKT 2010 05 10 07 14 55 31.3200 -97.3300 251.000 457.0 105.487 3.060 -999.990 -999.990 1.055 ..P WKT 2010 05 10 07 24 55 31.3200 -97.3300 251.000 30.0 171.855 2.970 -999.990 -999.990 1.719 ..P WKT 2010 05 10 07 29 55 31.3200 -97.3300 251.000 122.0 133.788 5.100 -999.990 -999.990 1.338 ..P WKT 2010 05 10 07 34 55 31.3200 -97.3300 251.000 457.0 109.919 3.630 -999.990 -999.990 1.099 ..P WKT 2010 05 10 07 39 55 31.3200 -97.3300 251.000 30.0 167.621 4.010 -999.990 -999.990 1.676 ..P WKT 2010 05 10 07 44 55 31.3200 -97.3300 251.000 122.0 130.946 2.910 -999.990 -999.990 1.309 ..P WKT 2010 05 10 07 49 55 31.3200 -97.3300 251.000 457.0 111.533 2.810 -999.990 -999.990 1.115 ..P WKT 2010 05 10 07 59 55 31.3200 -97.3300 251.000 30.0 154.652 2.890 -999.990 -999.990 1.547 ..P WKT 2010 05 10 08 04 55 31.3200 -97.3300 251.000 122.0 124.759 4.440 -999.990 -999.990 1.248 ..P WKT 2010 05 10 08 09 55 31.3200 -97.3300 251.000 457.0 108.508 3.730 -999.990 -999.990 1.085 ..P WKT 2010 05 10 08 14 55 31.3200 -97.3300 251.000 30.0 137.633 4.400 -999.990 -999.990 1.376 ..P WKT 2010 05 10 08 19 55 31.3200 -97.3300 251.000 122.0 112.055 4.520 -999.990 -999.990 1.121 ..P WKT 2010 05 10 08 24 55 31.3200 -97.3300 251.000 457.0 104.434 4.380 -999.990 -999.990 1.044 ..P WKT 2010 05 10 08 34 55 31.3200 -97.3300 251.000 30.0 125.798 5.180 -999.990 -999.990 1.258 ..P WKT 2010 05 10 08 39 55 31.3200 -97.3300 251.000 122.0 109.269 4.390 -999.990 -999.990 1.093 ..P WKT 2010 05 10 08 44 55 31.3200 -97.3300 251.000 457.0 102.205 3.940 -999.990 -999.990 1.022 ..P WKT 2010 05 10 08 49 55 31.3200 -97.3300 251.000 30.0 115.322 5.530 -999.990 -999.990 1.153 ..P WKT 2010 05 10 08 54 55 31.3200 -97.3300 251.000 122.0 115.078 4.070 -999.990 -999.990 1.151 ..P WKT 2010 05 10 08 59 55 31.3200 -97.3300 251.000 457.0 104.255 3.370 -999.990 -999.990 1.043 ..P WKT 2010 05 10 09 09 55 31.3200 -97.3300 251.000 30.0 104.443 3.110 -999.990 -999.990 1.044 ..P WKT 2010 05 10 09 14 55 31.3200 -97.3300 251.000 122.0 105.710 3.070 -999.990 -999.990 1.057 ..P WKT 2010 05 10 09 19 55 31.3200 -97.3300 251.000 457.0 106.142 3.500 -999.990 -999.990 1.061 ..P WKT 2010 05 10 09 24 55 31.3200 -97.3300 251.000 30.0 102.538 3.290 -999.990 -999.990 1.025 ..P WKT 2010 05 10 09 29 55 31.3200 -97.3300 251.000 122.0 105.892 3.250 -999.990 -999.990 1.059 ..P WKT 2010 05 10 09 34 55 31.3200 -97.3300 251.000 457.0 100.200 3.520 -999.990 -999.990 1.002 ..P WKT 2010 05 10 09 44 55 31.3200 -97.3300 251.000 30.0 104.186 3.740 -999.990 -999.990 1.042 ..P WKT 2010 05 10 09 49 55 31.3200 -97.3300 251.000 122.0 101.197 3.340 -999.990 -999.990 1.012 ..P WKT 2010 05 10 09 54 55 31.3200 -97.3300 251.000 457.0 104.333 3.480 -999.990 -999.990 1.043 ..P WKT 2010 05 10 09 59 55 31.3200 -97.3300 251.000 30.0 101.763 2.990 -999.990 -999.990 1.018 ..P WKT 2010 05 10 10 04 55 31.3200 -97.3300 251.000 122.0 109.631 3.470 -999.990 -999.990 1.096 ..P WKT 2010 05 10 10 09 55 31.3200 -97.3300 251.000 457.0 111.931 3.800 -999.990 -999.990 1.119 ..P WKT 2010 05 10 10 19 55 31.3200 -97.3300 251.000 30.0 109.256 2.780 -999.990 -999.990 1.093 ..P WKT 2010 05 10 10 24 55 31.3200 -97.3300 251.000 122.0 108.455 2.880 -999.990 -999.990 1.085 ..P WKT 2010 05 10 10 29 55 31.3200 -97.3300 251.000 457.0 106.540 2.860 -999.990 -999.990 1.065 ..P WKT 2010 05 10 10 34 55 31.3200 -97.3300 251.000 30.0 110.193 3.660 -999.990 -999.990 1.102 ..P WKT 2010 05 10 10 39 55 31.3200 -97.3300 251.000 122.0 118.298 2.850 -999.990 -999.990 1.183 ..P WKT 2010 05 10 10 44 55 31.3200 -97.3300 251.000 457.0 106.921 3.170 -999.990 -999.990 1.069 ..P WKT 2010 05 10 10 54 55 31.3200 -97.3300 251.000 30.0 104.843 3.200 -999.990 -999.990 1.048 ..P WKT 2010 05 10 10 59 55 31.3200 -97.3300 251.000 122.0 113.027 4.730 -999.990 -999.990 1.130 ..P WKT 2010 05 10 11 04 55 31.3200 -97.3300 251.000 457.0 106.461 3.330 -999.990 -999.990 1.065 ..P WKT 2010 05 10 11 09 55 31.3200 -97.3300 251.000 30.0 104.627 3.160 -999.990 -999.990 1.046 ..P WKT 2010 05 10 11 14 55 31.3200 -97.3300 251.000 122.0 107.245 3.190 -999.990 -999.990 1.072 ..P WKT 2010 05 10 11 19 55 31.3200 -97.3300 251.000 457.0 102.350 3.000 -999.990 -999.990 1.023 ..P WKT 2010 05 10 11 29 55 31.3200 -97.3300 251.000 30.0 102.283 3.520 -999.990 -999.990 1.023 ..P WKT 2010 05 10 11 34 55 31.3200 -97.3300 251.000 122.0 111.566 3.690 -999.990 -999.990 1.116 ..P WKT 2010 05 10 11 39 55 31.3200 -97.3300 251.000 457.0 119.179 3.200 -999.990 -999.990 1.192 ..P WKT 2010 05 10 11 44 55 31.3200 -97.3300 251.000 30.0 111.485 3.370 -999.990 -999.990 1.115 ..P WKT 2010 05 10 11 49 55 31.3200 -97.3300 251.000 122.0 114.089 3.350 -999.990 -999.990 1.141 ..P WKT 2010 05 10 12 09 55 31.3200 -97.3300 251.000 457.0 115.173 3.140 -999.990 -999.990 1.152 ..P WKT 2010 05 10 12 10 25 31.3200 -97.3300 251.000 457.0 116.682 3.050 -999.990 -999.990 1.167 ..P WKT 2010 05 10 12 10 55 31.3200 -97.3300 251.000 457.0 118.747 3.080 -999.990 -999.990 1.187 ..P WKT 2010 05 10 12 11 25 31.3200 -97.3300 251.000 457.0 115.386 3.210 -999.990 -999.990 1.154 ..P WKT 2010 05 10 12 11 55 31.3200 -97.3300 251.000 457.0 119.120 3.700 -999.990 -999.990 1.191 ..P WKT 2010 05 10 12 12 25 31.3200 -97.3300 251.000 457.0 121.324 3.170 -999.990 -999.990 1.213 ..P WKT 2010 05 10 12 12 55 31.3200 -97.3300 251.000 457.0 121.859 3.320 -999.990 -999.990 1.219 ..P WKT 2010 05 10 12 13 25 31.3200 -97.3300 251.000 457.0 118.776 3.040 -999.990 -999.990 1.188 ..P WKT 2010 05 10 12 13 55 31.3200 -97.3300 251.000 457.0 116.249 3.780 -999.990 -999.990 1.162 ..P WKT 2010 05 10 12 14 25 31.3200 -97.3300 251.000 457.0 118.454 5.760 -999.990 -999.990 1.185 ..P WKT 2010 05 10 12 14 55 31.3200 -97.3300 251.000 457.0 123.857 4.210 -999.990 -999.990 1.239 ..P WKT 2010 05 10 12 19 55 31.3200 -97.3300 251.000 30.0 114.038 3.080 -999.990 -999.990 1.140 ..P WKT 2010 05 10 12 24 55 31.3200 -97.3300 251.000 122.0 121.191 3.220 -999.990 -999.990 1.212 ..P WKT 2010 05 10 12 29 55 31.3200 -97.3300 251.000 457.0 126.675 3.590 -999.990 -999.990 1.267 ..P WKT 2010 05 10 12 34 55 31.3200 -97.3300 251.000 30.0 113.656 4.090 -999.990 -999.990 1.137 ..P WKT 2010 05 10 12 39 55 31.3200 -97.3300 251.000 122.0 118.723 3.940 -999.990 -999.990 1.187 ..P WKT 2010 05 10 12 44 55 31.3200 -97.3300 251.000 457.0 126.014 3.170 -999.990 -999.990 1.260 ..P WKT 2010 05 10 12 54 55 31.3200 -97.3300 251.000 30.0 115.135 3.090 -999.990 -999.990 1.151 ..P WKT 2010 05 10 12 59 55 31.3200 -97.3300 251.000 122.0 126.174 3.200 -999.990 -999.990 1.262 ..P WKT 2010 05 10 13 04 55 31.3200 -97.3300 251.000 457.0 136.378 4.370 -999.990 -999.990 1.364 ..P WKT 2010 05 10 13 09 55 31.3200 -97.3300 251.000 30.0 117.932 3.060 -999.990 -999.990 1.179 ..P WKT 2010 05 10 13 14 55 31.3200 -97.3300 251.000 122.0 131.056 2.830 -999.990 -999.990 1.311 ..P WKT 2010 05 10 13 19 55 31.3200 -97.3300 251.000 457.0 143.623 3.630 -999.990 -999.990 1.436 ..P WKT 2010 05 10 13 29 55 31.3200 -97.3300 251.000 30.0 125.230 2.860 -999.990 -999.990 1.252 ..P WKT 2010 05 10 13 34 55 31.3200 -97.3300 251.000 122.0 126.811 3.490 -999.990 -999.990 1.268 ..P WKT 2010 05 10 13 39 55 31.3200 -97.3300 251.000 457.0 136.456 3.410 -999.990 -999.990 1.365 ..P WKT 2010 05 10 13 44 55 31.3200 -97.3300 251.000 30.0 127.609 2.660 -999.990 -999.990 1.276 ..P WKT 2010 05 10 13 49 55 31.3200 -97.3300 251.000 122.0 132.248 3.840 -999.990 -999.990 1.322 ..P WKT 2010 05 10 13 54 55 31.3200 -97.3300 251.000 457.0 141.057 3.590 -999.990 -999.990 1.411 ..P WKT 2010 05 10 14 04 55 31.3200 -97.3300 251.000 30.0 134.327 3.590 -999.990 -999.990 1.343 ..P WKT 2010 05 10 14 09 55 31.3200 -97.3300 251.000 122.0 130.744 2.970 -999.990 -999.990 1.307 ..P WKT 2010 05 10 14 14 55 31.3200 -97.3300 251.000 457.0 143.286 3.300 -999.990 -999.990 1.433 ..P WKT 2010 05 10 14 19 55 31.3200 -97.3300 251.000 30.0 133.309 3.110 -999.990 -999.990 1.333 ..P WKT 2010 05 10 14 24 55 31.3200 -97.3300 251.000 122.0 141.402 3.230 -999.990 -999.990 1.414 ..P WKT 2010 05 10 14 29 55 31.3200 -97.3300 251.000 457.0 143.101 3.510 -999.990 -999.990 1.431 ..P WKT 2010 05 10 14 39 55 31.3200 -97.3300 251.000 30.0 128.133 3.740 -999.990 -999.990 1.281 ..P WKT 2010 05 10 14 44 55 31.3200 -97.3300 251.000 122.0 129.534 3.180 -999.990 -999.990 1.295 ..P WKT 2010 05 10 14 49 55 31.3200 -97.3300 251.000 457.0 135.382 2.880 -999.990 -999.990 1.354 ..P WKT 2010 05 10 14 54 55 31.3200 -97.3300 251.000 30.0 129.835 3.320 -999.990 -999.990 1.298 ..P WKT 2010 05 10 14 59 55 31.3200 -97.3300 251.000 122.0 134.015 2.590 -999.990 -999.990 1.340 ..P WKT 2010 05 10 15 04 55 31.3200 -97.3300 251.000 457.0 134.860 3.060 -999.990 -999.990 1.349 ..P WKT 2010 05 10 15 14 55 31.3200 -97.3300 251.000 30.0 129.642 2.310 -999.990 -999.990 1.296 ..P WKT 2010 05 10 15 19 55 31.3200 -97.3300 251.000 122.0 136.363 4.160 -999.990 -999.990 1.364 ..P WKT 2010 05 10 15 24 55 31.3200 -97.3300 251.000 457.0 130.300 4.390 -999.990 -999.990 1.303 ..P WKT 2010 05 10 15 29 55 31.3200 -97.3300 251.000 30.0 128.684 2.700 -999.990 -999.990 1.287 ..P WKT 2010 05 10 15 34 55 31.3200 -97.3300 251.000 122.0 134.292 2.630 -999.990 -999.990 1.343 ..P WKT 2010 05 10 15 39 55 31.3200 -97.3300 251.000 457.0 136.844 2.430 -999.990 -999.990 1.368 ..P WKT 2010 05 10 15 49 55 31.3200 -97.3300 251.000 30.0 128.135 2.620 -999.990 -999.990 1.281 ..P WKT 2010 05 10 15 54 55 31.3200 -97.3300 251.000 122.0 137.433 2.450 -999.990 -999.990 1.374 ..P WKT 2010 05 10 15 59 55 31.3200 -97.3300 251.000 457.0 134.508 2.870 -999.990 -999.990 1.345 ..P WKT 2010 05 10 16 04 55 31.3200 -97.3300 251.000 30.0 129.082 2.520 -999.990 -999.990 1.291 ..P WKT 2010 05 10 16 09 55 31.3200 -97.3300 251.000 122.0 131.018 6.140 -999.990 -999.990 1.310 ..P WKT 2010 05 10 16 14 55 31.3200 -97.3300 251.000 457.0 133.093 2.790 -999.990 -999.990 1.331 ..P WKT 2010 05 10 16 24 55 31.3200 -97.3300 251.000 30.0 130.100 3.170 -999.990 -999.990 1.301 ..P WKT 2010 05 10 16 29 55 31.3200 -97.3300 251.000 122.0 128.921 3.330 -999.990 -999.990 1.289 ..P WKT 2010 05 10 16 34 55 31.3200 -97.3300 251.000 457.0 124.687 3.380 -999.990 -999.990 1.247 ..P WKT 2010 05 10 16 39 55 31.3200 -97.3300 251.000 30.0 132.673 4.220 -999.990 -999.990 1.327 ..P WKT 2010 05 10 16 44 55 31.3200 -97.3300 251.000 122.0 134.550 4.180 -999.990 -999.990 1.346 ..P WKT 2010 05 10 16 49 55 31.3200 -97.3300 251.000 457.0 128.233 4.440 -999.990 -999.990 1.282 ..P WKT 2010 05 10 17 04 55 31.3200 -97.3300 251.000 30.0 123.780 4.160 -999.990 -999.990 1.238 ..P WKT 2010 05 10 17 09 55 31.3200 -97.3300 251.000 122.0 129.987 3.720 -999.990 -999.990 1.300 ..P WKT 2010 05 10 17 14 55 31.3200 -97.3300 251.000 457.0 134.528 3.870 -999.990 -999.990 1.345 ..P WKT 2010 05 10 17 19 55 31.3200 -97.3300 251.000 30.0 132.960 3.870 -999.990 -999.990 1.330 ..P WKT 2010 05 10 17 24 55 31.3200 -97.3300 251.000 122.0 136.529 2.940 -999.990 -999.990 1.365 ..P WKT 2010 05 10 17 29 55 31.3200 -97.3300 251.000 457.0 125.799 2.650 -999.990 -999.990 1.258 ..P WKT 2010 05 10 17 39 55 31.3200 -97.3300 251.000 30.0 132.412 2.520 -999.990 -999.990 1.324 ..P WKT 2010 05 10 17 44 55 31.3200 -97.3300 251.000 122.0 144.064 2.870 -999.990 -999.990 1.441 ..P WKT 2010 05 10 17 49 55 31.3200 -97.3300 251.000 457.0 140.863 3.790 -999.990 -999.990 1.409 ..P WKT 2010 05 10 17 54 55 31.3200 -97.3300 251.000 30.0 135.857 4.120 -999.990 -999.990 1.359 ..P WKT 2010 05 10 17 59 55 31.3200 -97.3300 251.000 122.0 142.233 3.430 -999.990 -999.990 1.422 ..P WKT 2010 05 10 18 04 55 31.3200 -97.3300 251.000 457.0 136.256 2.330 -999.990 -999.990 1.363 ..P WKT 2010 05 10 18 14 55 31.3200 -97.3300 251.000 30.0 142.741 2.650 -999.990 -999.990 1.427 ..P WKT 2010 05 10 18 19 55 31.3200 -97.3300 251.000 122.0 134.109 3.310 -999.990 -999.990 1.341 ..P WKT 2010 05 10 18 24 55 31.3200 -97.3300 251.000 457.0 129.363 3.680 -999.990 -999.990 1.294 ..P WKT 2010 05 10 18 29 55 31.3200 -97.3300 251.000 30.0 131.832 4.190 -999.990 -999.990 1.318 ..P WKT 2010 05 10 18 34 55 31.3200 -97.3300 251.000 122.0 138.187 2.700 -999.990 -999.990 1.382 ..P WKT 2010 05 10 18 39 55 31.3200 -97.3300 251.000 457.0 137.326 2.700 -999.990 -999.990 1.373 ..P WKT 2010 05 10 18 49 55 31.3200 -97.3300 251.000 30.0 127.637 3.660 -999.990 -999.990 1.276 ..P WKT 2010 05 10 18 54 55 31.3200 -97.3300 251.000 122.0 132.960 3.760 -999.990 -999.990 1.330 ..P WKT 2010 05 10 18 59 55 31.3200 -97.3300 251.000 457.0 136.895 3.620 -999.990 -999.990 1.369 ..P WKT 2010 05 10 19 04 55 31.3200 -97.3300 251.000 30.0 137.501 2.670 -999.990 -999.990 1.375 ..P WKT 2010 05 10 19 09 55 31.3200 -97.3300 251.000 122.0 138.106 2.660 -999.990 -999.990 1.381 ..P WKT 2010 05 10 19 14 55 31.3200 -97.3300 251.000 457.0 135.938 2.660 -999.990 -999.990 1.359 ..P WKT 2010 05 10 19 24 55 31.3200 -97.3300 251.000 30.0 132.195 2.710 -999.990 -999.990 1.322 ..P WKT 2010 05 10 19 29 55 31.3200 -97.3300 251.000 122.0 138.389 2.580 -999.990 -999.990 1.384 ..P WKT 2010 05 10 19 34 55 31.3200 -97.3300 251.000 457.0 135.705 3.080 -999.990 -999.990 1.357 ..P WKT 2010 05 10 19 39 55 31.3200 -97.3300 251.000 30.0 134.409 2.230 -999.990 -999.990 1.344 ..P WKT 2010 05 10 19 44 55 31.3200 -97.3300 251.000 122.0 139.492 3.640 -999.990 -999.990 1.395 ..P WKT 2010 05 10 19 49 55 31.3200 -97.3300 251.000 457.0 130.152 2.000 -999.990 -999.990 1.302 ..P WKT 2010 05 10 19 59 55 31.3200 -97.3300 251.000 30.0 127.976 2.010 -999.990 -999.990 1.280 ..P WKT 2010 05 10 20 04 55 31.3200 -97.3300 251.000 122.0 133.614 2.780 -999.990 -999.990 1.336 ..P WKT 2010 05 10 20 09 55 31.3200 -97.3300 251.000 457.0 133.011 3.110 -999.990 -999.990 1.330 ..P WKT 2010 05 10 20 14 55 31.3200 -97.3300 251.000 30.0 130.190 2.510 -999.990 -999.990 1.302 ..P WKT 2010 05 10 20 19 55 31.3200 -97.3300 251.000 122.0 130.558 2.540 -999.990 -999.990 1.306 ..P WKT 2010 05 10 20 24 55 31.3200 -97.3300 251.000 457.0 134.530 3.780 -999.990 -999.990 1.345 ..P WKT 2010 05 10 20 34 55 31.3200 -97.3300 251.000 30.0 127.067 3.270 -999.990 -999.990 1.271 ..P WKT 2010 05 10 20 39 55 31.3200 -97.3300 251.000 122.0 124.920 3.010 -999.990 -999.990 1.249 ..P WKT 2010 05 10 20 44 55 31.3200 -97.3300 251.000 457.0 128.041 3.070 -999.990 -999.990 1.280 ..P WKT 2010 05 10 20 49 55 31.3200 -97.3300 251.000 30.0 121.458 2.270 -999.990 -999.990 1.215 ..P WKT 2010 05 10 20 54 55 31.3200 -97.3300 251.000 122.0 130.677 2.450 -999.990 -999.990 1.307 ..P WKT 2010 05 10 20 59 55 31.3200 -97.3300 251.000 457.0 123.402 2.400 -999.990 -999.990 1.234 ..P WKT 2010 05 10 21 09 55 31.3200 -97.3300 251.000 30.0 130.711 3.240 -999.990 -999.990 1.307 ..P WKT 2010 05 10 21 14 55 31.3200 -97.3300 251.000 122.0 131.574 2.680 -999.990 -999.990 1.316 ..P WKT 2010 05 10 21 19 55 31.3200 -97.3300 251.000 457.0 132.991 3.910 -999.990 -999.990 1.330 ..P WKT 2010 05 10 21 24 55 31.3200 -97.3300 251.000 30.0 132.468 3.370 -999.990 -999.990 1.325 ..P WKT 2010 05 10 21 29 55 31.3200 -97.3300 251.000 122.0 134.024 3.700 -999.990 -999.990 1.340 ..P WKT 2010 05 10 21 34 55 31.3200 -97.3300 251.000 457.0 129.897 4.950 -999.990 -999.990 1.299 ..P WKT 2010 05 10 21 44 55 31.3200 -97.3300 251.000 30.0 125.031 4.180 -999.990 -999.990 1.250 ..P WKT 2010 05 10 21 49 55 31.3200 -97.3300 251.000 122.0 130.249 3.940 -999.990 -999.990 1.302 ..P WKT 2010 05 10 21 54 55 31.3200 -97.3300 251.000 457.0 119.948 4.030 -999.990 -999.990 1.199 ..P WKT 2010 05 10 21 59 55 31.3200 -97.3300 251.000 30.0 124.334 4.360 -999.990 -999.990 1.243 ..P WKT 2010 05 10 22 04 55 31.3200 -97.3300 251.000 122.0 123.732 2.890 -999.990 -999.990 1.237 ..P WKT 2010 05 10 22 09 55 31.3200 -97.3300 251.000 457.0 123.407 3.350 -999.990 -999.990 1.234 ..P WKT 2010 05 10 22 19 55 31.3200 -97.3300 251.000 30.0 116.050 2.180 -999.990 -999.990 1.161 ..P WKT 2010 05 10 22 24 55 31.3200 -97.3300 251.000 122.0 125.501 3.320 -999.990 -999.990 1.255 ..P WKT 2010 05 10 22 29 55 31.3200 -97.3300 251.000 457.0 122.900 3.170 -999.990 -999.990 1.229 ..P WKT 2010 05 10 22 34 55 31.3200 -97.3300 251.000 30.0 116.560 3.840 -999.990 -999.990 1.166 ..P WKT 2010 05 10 22 39 55 31.3200 -97.3300 251.000 122.0 128.226 4.330 -999.990 -999.990 1.282 ..P WKT 2010 05 10 22 44 55 31.3200 -97.3300 251.000 457.0 119.393 2.200 -999.990 -999.990 1.194 ..P WKT 2010 05 10 22 54 55 31.3200 -97.3300 251.000 30.0 120.129 3.290 -999.990 -999.990 1.201 ..P WKT 2010 05 10 22 59 55 31.3200 -97.3300 251.000 122.0 129.558 2.970 -999.990 -999.990 1.296 ..P WKT 2010 05 10 23 04 55 31.3200 -97.3300 251.000 457.0 124.861 2.530 -999.990 -999.990 1.249 ..P WKT 2010 05 10 23 09 55 31.3200 -97.3300 251.000 30.0 127.642 2.580 -999.990 -999.990 1.276 ..P WKT 2010 05 10 23 14 55 31.3200 -97.3300 251.000 122.0 126.270 2.480 -999.990 -999.990 1.263 ..P WKT 2010 05 10 23 19 55 31.3200 -97.3300 251.000 457.0 121.296 1.790 -999.990 -999.990 1.213 ..P WKT 2010 05 10 23 29 55 31.3200 -97.3300 251.000 30.0 127.862 3.370 -999.990 -999.990 1.279 ..P WKT 2010 05 10 23 34 55 31.3200 -97.3300 251.000 122.0 123.339 2.720 -999.990 -999.990 1.233 ..P WKT 2010 05 10 23 39 55 31.3200 -97.3300 251.000 457.0 121.031 2.680 -999.990 -999.990 1.210 ..P WKT 2010 05 10 23 44 55 31.3200 -97.3300 251.000 30.0 120.663 3.420 -999.990 -999.990 1.207 ..P WKT 2010 05 10 23 49 55 31.3200 -97.3300 251.000 122.0 118.909 2.980 -999.990 -999.990 1.189 ..P WKT 2010 05 11 00 09 55 31.3200 -97.3300 251.000 457.0 123.902 3.210 -999.990 -999.990 1.239 ..P WKT 2010 05 11 00 10 25 31.3200 -97.3300 251.000 457.0 118.978 3.200 -999.990 -999.990 1.190 ..P WKT 2010 05 11 00 10 55 31.3200 -97.3300 251.000 457.0 119.314 3.700 -999.990 -999.990 1.193 ..P WKT 2010 05 11 00 11 25 31.3200 -97.3300 251.000 457.0 120.759 3.240 -999.990 -999.990 1.208 ..P WKT 2010 05 11 00 11 55 31.3200 -97.3300 251.000 457.0 123.587 2.580 -999.990 -999.990 1.236 ..P WKT 2010 05 11 00 12 25 31.3200 -97.3300 251.000 457.0 120.602 2.190 -999.990 -999.990 1.206 ..P WKT 2010 05 11 00 12 55 31.3200 -97.3300 251.000 457.0 122.323 2.220 -999.990 -999.990 1.223 ..P WKT 2010 05 11 00 13 25 31.3200 -97.3300 251.000 457.0 119.613 2.780 -999.990 -999.990 1.196 ..P WKT 2010 05 11 00 13 55 31.3200 -97.3300 251.000 457.0 119.673 4.650 -999.990 -999.990 1.197 ..P WKT 2010 05 11 00 14 25 31.3200 -97.3300 251.000 457.0 122.224 3.790 -999.990 -999.990 1.222 ..P WKT 2010 05 11 00 14 55 31.3200 -97.3300 251.000 457.0 121.731 2.840 -999.990 -999.990 1.217 ..P WKT 2010 05 11 00 19 55 31.3200 -97.3300 251.000 30.0 122.605 4.110 -999.990 -999.990 1.226 ..P WKT 2010 05 11 00 24 55 31.3200 -97.3300 251.000 122.0 132.064 3.350 -999.990 -999.990 1.321 ..P WKT 2010 05 11 00 29 55 31.3200 -97.3300 251.000 457.0 123.245 2.930 -999.990 -999.990 1.232 ..P WKT 2010 05 11 00 34 55 31.3200 -97.3300 251.000 30.0 119.411 3.590 -999.990 -999.990 1.194 ..P WKT 2010 05 11 00 39 55 31.3200 -97.3300 251.000 122.0 132.472 3.830 -999.990 -999.990 1.325 ..P WKT 2010 05 11 00 44 55 31.3200 -97.3300 251.000 457.0 129.746 3.850 -999.990 -999.990 1.297 ..P WKT 2010 05 11 00 54 55 31.3200 -97.3300 251.000 30.0 125.988 4.810 -999.990 -999.990 1.260 ..P WKT 2010 05 11 00 59 55 31.3200 -97.3300 251.000 122.0 129.805 3.420 -999.990 -999.990 1.298 ..P WKT 2010 05 11 01 04 55 31.3200 -97.3300 251.000 457.0 126.002 4.640 -999.990 -999.990 1.260 ..P WKT 2010 05 11 01 09 55 31.3200 -97.3300 251.000 30.0 123.862 2.700 -999.990 -999.990 1.239 ..P WKT 2010 05 11 01 14 55 31.3200 -97.3300 251.000 122.0 138.072 3.550 -999.990 -999.990 1.381 ..P WKT 2010 05 11 01 19 55 31.3200 -97.3300 251.000 457.0 127.895 2.200 -999.990 -999.990 1.279 ..P WKT 2010 05 11 01 29 55 31.3200 -97.3300 251.000 30.0 126.424 2.770 -999.990 -999.990 1.264 ..P WKT 2010 05 11 01 34 55 31.3200 -97.3300 251.000 122.0 127.511 4.090 -999.990 -999.990 1.275 ..P WKT 2010 05 11 01 39 55 31.3200 -97.3300 251.000 457.0 125.410 3.950 -999.990 -999.990 1.254 ..P WKT 2010 05 11 01 44 55 31.3200 -97.3300 251.000 30.0 126.773 2.430 -999.990 -999.990 1.268 ..P WKT 2010 05 11 01 49 55 31.3200 -97.3300 251.000 122.0 129.246 2.470 -999.990 -999.990 1.292 ..P WKT 2010 05 11 01 54 55 31.3200 -97.3300 251.000 457.0 128.531 2.690 -999.990 -999.990 1.285 ..P WKT 2010 05 11 02 04 55 31.3200 -97.3300 251.000 30.0 124.544 2.800 -999.990 -999.990 1.245 ..P WKT 2010 05 11 02 09 55 31.3200 -97.3300 251.000 122.0 126.265 4.600 -999.990 -999.990 1.263 ..P WKT 2010 05 11 02 14 55 31.3200 -97.3300 251.000 457.0 126.460 2.410 -999.990 -999.990 1.265 ..P WKT 2010 05 11 02 19 55 31.3200 -97.3300 251.000 30.0 127.904 2.330 -999.990 -999.990 1.279 ..P WKT 2010 05 11 02 24 55 31.3200 -97.3300 251.000 122.0 123.662 2.690 -999.990 -999.990 1.237 ..P WKT 2010 05 11 02 29 55 31.3200 -97.3300 251.000 457.0 119.003 2.250 -999.990 -999.990 1.190 ..P WKT 2010 05 11 02 39 55 31.3200 -97.3300 251.000 30.0 115.251 2.140 -999.990 -999.990 1.153 ..P WKT 2010 05 11 02 44 55 31.3200 -97.3300 251.000 122.0 121.153 2.490 -999.990 -999.990 1.212 ..P WKT 2010 05 11 02 49 55 31.3200 -97.3300 251.000 457.0 115.125 2.460 -999.990 -999.990 1.151 ..P WKT 2010 05 11 02 54 55 31.3200 -97.3300 251.000 30.0 112.426 2.970 -999.990 -999.990 1.124 ..P WKT 2010 05 11 02 59 55 31.3200 -97.3300 251.000 122.0 123.046 3.290 -999.990 -999.990 1.230 ..P WKT 2010 05 11 03 04 55 31.3200 -97.3300 251.000 457.0 111.189 2.970 -999.990 -999.990 1.112 ..P WKT 2010 05 11 03 14 55 31.3200 -97.3300 251.000 30.0 115.583 3.370 -999.990 -999.990 1.156 ..P WKT 2010 05 11 03 19 55 31.3200 -97.3300 251.000 122.0 111.853 2.870 -999.990 -999.990 1.119 ..P WKT 2010 05 11 03 24 55 31.3200 -97.3300 251.000 457.0 109.787 5.000 -999.990 -999.990 1.098 ..P WKT 2010 05 11 03 29 55 31.3200 -97.3300 251.000 30.0 114.662 4.780 -999.990 -999.990 1.147 ..P WKT 2010 05 11 03 34 55 31.3200 -97.3300 251.000 122.0 115.928 3.290 -999.990 -999.990 1.159 ..P WKT 2010 05 11 03 39 55 31.3200 -97.3300 251.000 457.0 114.417 3.870 -999.990 -999.990 1.144 ..P WKT 2010 05 11 03 49 55 31.3200 -97.3300 251.000 30.0 113.101 2.870 -999.990 -999.990 1.131 ..P WKT 2010 05 11 03 54 55 31.3200 -97.3300 251.000 122.0 115.517 3.130 -999.990 -999.990 1.155 ..P WKT 2010 05 11 03 59 55 31.3200 -97.3300 251.000 457.0 119.323 2.840 -999.990 -999.990 1.193 ..P WKT 2010 05 11 04 04 55 31.3200 -97.3300 251.000 30.0 118.684 3.790 -999.990 -999.990 1.187 ..P WKT 2010 05 11 04 09 55 31.3200 -97.3300 251.000 122.0 116.935 2.570 -999.990 -999.990 1.169 ..P WKT 2010 05 11 04 14 55 31.3200 -97.3300 251.000 457.0 112.408 3.130 -999.990 -999.990 1.124 ..P WKT 2010 05 11 04 24 55 31.3200 -97.3300 251.000 30.0 114.664 3.120 -999.990 -999.990 1.147 ..P WKT 2010 05 11 04 29 55 31.3200 -97.3300 251.000 122.0 118.668 2.920 -999.990 -999.990 1.187 ..P WKT 2010 05 11 04 34 55 31.3200 -97.3300 251.000 457.0 117.673 4.860 -999.990 -999.990 1.177 ..P WKT 2010 05 11 04 39 55 31.3200 -97.3300 251.000 30.0 113.899 2.780 -999.990 -999.990 1.139 ..P WKT 2010 05 11 04 44 55 31.3200 -97.3300 251.000 122.0 119.016 2.520 -999.990 -999.990 1.190 ..P WKT 2010 05 11 04 49 55 31.3200 -97.3300 251.000 457.0 119.411 4.270 -999.990 -999.990 1.194 ..P WKT 2010 05 11 05 04 55 31.3200 -97.3300 251.000 30.0 117.262 3.180 -999.990 -999.990 1.173 ..P WKT 2010 05 11 05 09 55 31.3200 -97.3300 251.000 122.0 125.720 2.870 -999.990 -999.990 1.257 ..P WKT 2010 05 11 05 14 55 31.3200 -97.3300 251.000 457.0 118.332 3.030 -999.990 -999.990 1.183 ..P WKT 2010 05 11 05 19 55 31.3200 -97.3300 251.000 30.0 120.119 3.570 -999.990 -999.990 1.201 ..P WKT 2010 05 11 05 24 55 31.3200 -97.3300 251.000 122.0 124.130 2.830 -999.990 -999.990 1.241 ..P WKT 2010 05 11 05 29 55 31.3200 -97.3300 251.000 457.0 119.384 3.340 -999.990 -999.990 1.194 ..P WKT 2010 05 11 05 39 55 31.3200 -97.3300 251.000 30.0 127.166 4.060 -999.990 -999.990 1.272 ..P WKT 2010 05 11 05 44 55 31.3200 -97.3300 251.000 122.0 122.734 5.550 -999.990 -999.990 1.227 ..P WKT 2010 05 11 05 49 55 31.3200 -97.3300 251.000 457.0 115.520 4.410 -999.990 -999.990 1.155 ..P WKT 2010 05 11 05 54 55 31.3200 -97.3300 251.000 30.0 118.317 4.480 -999.990 -999.990 1.183 ..P WKT 2010 05 11 05 59 55 31.3200 -97.3300 251.000 122.0 119.447 3.230 -999.990 -999.990 1.194 ..P WKT 2010 05 11 06 04 55 31.3200 -97.3300 251.000 457.0 113.761 2.960 -999.990 -999.990 1.138 ..P WKT 2010 05 11 06 14 55 31.3200 -97.3300 251.000 30.0 116.636 3.660 -999.990 -999.990 1.166 ..P WKT 2010 05 11 06 19 55 31.3200 -97.3300 251.000 122.0 121.720 3.300 -999.990 -999.990 1.217 ..P WKT 2010 05 11 06 24 55 31.3200 -97.3300 251.000 457.0 114.840 2.180 -999.990 -999.990 1.148 ..P WKT 2010 05 11 06 29 55 31.3200 -97.3300 251.000 30.0 119.090 2.190 -999.990 -999.990 1.191 ..P WKT 2010 05 11 06 34 55 31.3200 -97.3300 251.000 122.0 123.619 2.330 -999.990 -999.990 1.236 ..P WKT 2010 05 11 06 39 55 31.3200 -97.3300 251.000 457.0 112.842 2.240 -999.990 -999.990 1.128 ..P WKT 2010 05 11 06 49 55 31.3200 -97.3300 251.000 30.0 119.018 2.940 -999.990 -999.990 1.190 ..P WKT 2010 05 11 06 54 55 31.3200 -97.3300 251.000 122.0 119.412 2.460 -999.990 -999.990 1.194 ..P WKT 2010 05 11 06 59 55 31.3200 -97.3300 251.000 457.0 113.961 1.830 -999.990 -999.990 1.140 ..P WKT 2010 05 11 07 04 55 31.3200 -97.3300 251.000 30.0 120.758 1.980 -999.990 -999.990 1.208 ..P WKT 2010 05 11 07 09 55 31.3200 -97.3300 251.000 122.0 122.266 2.010 -999.990 -999.990 1.223 ..P WKT 2010 05 11 07 14 55 31.3200 -97.3300 251.000 457.0 117.928 2.930 -999.990 -999.990 1.179 ..P WKT 2010 05 11 07 24 55 31.3200 -97.3300 251.000 30.0 121.979 3.420 -999.990 -999.990 1.220 ..P WKT 2010 05 11 07 29 55 31.3200 -97.3300 251.000 122.0 121.181 2.110 -999.990 -999.990 1.212 ..P WKT 2010 05 11 07 34 55 31.3200 -97.3300 251.000 457.0 119.547 2.230 -999.990 -999.990 1.195 ..P WKT 2010 05 11 07 39 55 31.3200 -97.3300 251.000 30.0 115.684 2.080 -999.990 -999.990 1.157 ..P WKT 2010 05 11 07 44 55 31.3200 -97.3300 251.000 122.0 131.875 2.260 -999.990 -999.990 1.319 ..P WKT 2010 05 11 07 49 55 31.3200 -97.3300 251.000 457.0 120.213 2.910 -999.990 -999.990 1.202 ..P WKT 2010 05 11 07 59 55 31.3200 -97.3300 251.000 30.0 122.436 2.670 -999.990 -999.990 1.224 ..P WKT 2010 05 11 08 04 55 31.3200 -97.3300 251.000 122.0 121.837 2.900 -999.990 -999.990 1.218 ..P WKT 2010 05 11 08 09 55 31.3200 -97.3300 251.000 457.0 117.057 2.670 -999.990 -999.990 1.171 ..P WKT 2010 05 11 08 14 55 31.3200 -97.3300 251.000 30.0 123.144 2.800 -999.990 -999.990 1.231 ..P WKT 2010 05 11 08 19 55 31.3200 -97.3300 251.000 122.0 118.921 3.090 -999.990 -999.990 1.189 ..P WKT 2010 05 11 08 24 55 31.3200 -97.3300 251.000 457.0 119.715 3.420 -999.990 -999.990 1.197 ..P WKT 2010 05 11 08 34 55 31.3200 -97.3300 251.000 30.0 126.019 3.100 -999.990 -999.990 1.260 ..P WKT 2010 05 11 08 39 55 31.3200 -97.3300 251.000 122.0 125.957 2.940 -999.990 -999.990 1.260 ..P WKT 2010 05 11 08 44 55 31.3200 -97.3300 251.000 457.0 117.950 3.200 -999.990 -999.990 1.179 ..P WKT 2010 05 11 08 49 55 31.3200 -97.3300 251.000 30.0 123.880 5.550 -999.990 -999.990 1.239 ..P WKT 2010 05 11 08 54 55 31.3200 -97.3300 251.000 122.0 124.654 2.340 -999.990 -999.990 1.247 ..P WKT 2010 05 11 08 59 55 31.3200 -97.3300 251.000 457.0 115.252 4.120 -999.990 -999.990 1.153 ..P WKT 2010 05 11 09 09 55 31.3200 -97.3300 251.000 30.0 119.567 2.710 -999.990 -999.990 1.196 ..P WKT 2010 05 11 09 14 55 31.3200 -97.3300 251.000 122.0 123.807 2.450 -999.990 -999.990 1.238 ..P WKT 2010 05 11 09 19 55 31.3200 -97.3300 251.000 457.0 115.497 3.630 -999.990 -999.990 1.155 ..P WKT 2010 05 11 09 24 55 31.3200 -97.3300 251.000 30.0 115.276 2.610 -999.990 -999.990 1.153 ..P WKT 2010 05 11 09 29 55 31.3200 -97.3300 251.000 122.0 122.583 2.760 -999.990 -999.990 1.226 ..P WKT 2010 05 11 09 34 55 31.3200 -97.3300 251.000 457.0 109.113 2.560 -999.990 -999.990 1.091 ..P WKT 2010 05 11 09 44 55 31.3200 -97.3300 251.000 30.0 116.059 3.330 -999.990 -999.990 1.161 ..P WKT 2010 05 11 09 49 55 31.3200 -97.3300 251.000 122.0 123.787 2.760 -999.990 -999.990 1.238 ..P WKT 2010 05 11 09 54 55 31.3200 -97.3300 251.000 457.0 114.638 3.490 -999.990 -999.990 1.146 ..P WKT 2010 05 11 09 59 55 31.3200 -97.3300 251.000 30.0 121.250 3.790 -999.990 -999.990 1.213 ..P WKT 2010 05 11 10 04 55 31.3200 -97.3300 251.000 122.0 125.911 2.880 -999.990 -999.990 1.259 ..P WKT 2010 05 11 10 09 55 31.3200 -97.3300 251.000 457.0 113.272 3.270 -999.990 -999.990 1.133 ..P WKT 2010 05 11 10 19 55 31.3200 -97.3300 251.000 30.0 122.993 2.390 -999.990 -999.990 1.230 ..P WKT 2010 05 11 10 24 55 31.3200 -97.3300 251.000 122.0 128.332 3.250 -999.990 -999.990 1.283 ..P WKT 2010 05 11 10 29 55 31.3200 -97.3300 251.000 457.0 125.858 3.810 -999.990 -999.990 1.259 ..P WKT 2010 05 11 10 34 55 31.3200 -97.3300 251.000 30.0 124.639 2.870 -999.990 -999.990 1.246 ..P WKT 2010 05 11 10 39 55 31.3200 -97.3300 251.000 122.0 125.513 2.750 -999.990 -999.990 1.255 ..P WKT 2010 05 11 10 44 55 31.3200 -97.3300 251.000 457.0 118.990 3.470 -999.990 -999.990 1.190 ..P WKT 2010 05 11 10 54 55 31.3200 -97.3300 251.000 30.0 118.545 3.170 -999.990 -999.990 1.185 ..P WKT 2010 05 11 10 59 55 31.3200 -97.3300 251.000 122.0 118.064 2.780 -999.990 -999.990 1.181 ..P WKT 2010 05 11 11 04 55 31.3200 -97.3300 251.000 457.0 129.309 2.880 -999.990 -999.990 1.293 ..P WKT 2010 05 11 11 09 55 31.3200 -97.3300 251.000 30.0 119.892 2.880 -999.990 -999.990 1.199 ..P WKT 2010 05 11 11 14 55 31.3200 -97.3300 251.000 122.0 129.464 2.340 -999.990 -999.990 1.295 ..P WKT 2010 05 11 11 19 55 31.3200 -97.3300 251.000 457.0 131.776 2.760 -999.990 -999.990 1.318 ..P WKT 2010 05 11 11 29 55 31.3200 -97.3300 251.000 30.0 120.119 3.480 -999.990 -999.990 1.201 ..P WKT 2010 05 11 11 34 55 31.3200 -97.3300 251.000 122.0 122.910 2.550 -999.990 -999.990 1.229 ..P WKT 2010 05 11 11 39 55 31.3200 -97.3300 251.000 457.0 124.583 2.490 -999.990 -999.990 1.246 ..P WKT 2010 05 11 11 44 55 31.3200 -97.3300 251.000 30.0 122.346 2.990 -999.990 -999.990 1.223 ..P WKT 2010 05 11 11 49 55 31.3200 -97.3300 251.000 122.0 121.225 2.800 -999.990 -999.990 1.212 ..P WKT 2010 05 11 12 09 55 31.3200 -97.3300 251.000 457.0 130.936 2.750 -999.990 -999.990 1.309 ..P WKT 2010 05 11 12 10 25 31.3200 -97.3300 251.000 457.0 136.769 3.310 -999.990 -999.990 1.368 ..P WKT 2010 05 11 12 10 55 31.3200 -97.3300 251.000 457.0 135.057 4.050 -999.990 -999.990 1.351 ..P WKT 2010 05 11 12 11 25 31.3200 -97.3300 251.000 457.0 130.830 4.030 -999.990 -999.990 1.308 ..P WKT 2010 05 11 12 11 55 31.3200 -97.3300 251.000 457.0 137.500 2.810 -999.990 -999.990 1.375 ..P WKT 2010 05 11 12 12 25 31.3200 -97.3300 251.000 457.0 136.906 2.910 -999.990 -999.990 1.369 ..P WKT 2010 05 11 12 12 55 31.3200 -97.3300 251.000 457.0 138.547 2.900 -999.990 -999.990 1.385 ..P WKT 2010 05 11 12 13 25 31.3200 -97.3300 251.000 457.0 138.791 2.720 -999.990 -999.990 1.388 ..P WKT 2010 05 11 12 13 55 31.3200 -97.3300 251.000 457.0 136.799 2.870 -999.990 -999.990 1.368 ..P WKT 2010 05 11 12 14 25 31.3200 -97.3300 251.000 457.0 133.970 2.890 -999.990 -999.990 1.340 ..P WKT 2010 05 11 12 14 55 31.3200 -97.3300 251.000 457.0 138.685 2.850 -999.990 -999.990 1.387 ..P WKT 2010 05 11 12 19 55 31.3200 -97.3300 251.000 30.0 129.948 3.770 -999.990 -999.990 1.299 ..P WKT 2010 05 11 12 24 55 31.3200 -97.3300 251.000 122.0 131.548 3.120 -999.990 -999.990 1.315 ..P WKT 2010 05 11 12 29 55 31.3200 -97.3300 251.000 457.0 144.325 2.540 -999.990 -999.990 1.443 ..P WKT 2010 05 11 12 34 55 31.3200 -97.3300 251.000 30.0 130.000 2.230 -999.990 -999.990 1.300 ..P WKT 2010 05 11 12 39 55 31.3200 -97.3300 251.000 122.0 135.512 2.750 -999.990 -999.990 1.355 ..P WKT 2010 05 11 12 44 55 31.3200 -97.3300 251.000 457.0 152.478 4.150 -999.990 -999.990 1.525 ..P WKT 2010 05 11 12 54 55 31.3200 -97.3300 251.000 30.0 134.485 2.330 -999.990 -999.990 1.345 ..P WKT 2010 05 11 12 59 55 31.3200 -97.3300 251.000 122.0 132.911 2.640 -999.990 -999.990 1.329 ..P WKT 2010 05 11 13 04 55 31.3200 -97.3300 251.000 457.0 146.980 3.410 -999.990 -999.990 1.470 ..P WKT 2010 05 11 13 09 55 31.3200 -97.3300 251.000 30.0 124.735 3.810 -999.990 -999.990 1.247 ..P WKT 2010 05 11 13 14 55 31.3200 -97.3300 251.000 122.0 135.312 4.290 -999.990 -999.990 1.353 ..P WKT 2010 05 11 13 19 55 31.3200 -97.3300 251.000 457.0 152.590 5.020 -999.990 -999.990 1.526 ..P WKT 2010 05 11 13 29 55 31.3200 -97.3300 251.000 30.0 133.841 5.160 -999.990 -999.990 1.338 ..P WKT 2010 05 11 13 34 55 31.3200 -97.3300 251.000 122.0 142.361 4.460 -999.990 -999.990 1.424 ..P WKT 2010 05 11 13 39 55 31.3200 -97.3300 251.000 457.0 154.651 4.220 -999.990 -999.990 1.547 ..P WKT 2010 05 11 13 44 55 31.3200 -97.3300 251.000 30.0 139.572 4.240 -999.990 -999.990 1.396 ..P WKT 2010 05 11 13 49 55 31.3200 -97.3300 251.000 122.0 147.812 3.320 -999.990 -999.990 1.478 ..P WKT 2010 05 11 13 54 55 31.3200 -97.3300 251.000 457.0 162.055 3.100 -999.990 -999.990 1.621 ..P WKT 2010 05 11 14 04 55 31.3200 -97.3300 251.000 30.0 142.751 2.450 -999.990 -999.990 1.428 ..P WKT 2010 05 11 14 09 55 31.3200 -97.3300 251.000 122.0 151.369 3.700 -999.990 -999.990 1.514 ..P WKT 2010 05 11 14 14 55 31.3200 -97.3300 251.000 457.0 156.775 3.880 -999.990 -999.990 1.568 ..P WKT 2010 05 11 14 19 55 31.3200 -97.3300 251.000 30.0 163.159 4.050 -999.990 -999.990 1.632 ..P WKT 2010 05 11 14 24 55 31.3200 -97.3300 251.000 122.0 168.564 4.080 -999.990 -999.990 1.686 ..P WKT 2010 05 11 14 29 55 31.3200 -97.3300 251.000 457.0 169.083 3.330 -999.990 -999.990 1.691 ..P WKT 2010 05 11 14 39 55 31.3200 -97.3300 251.000 30.0 158.996 3.900 -999.990 -999.990 1.590 ..P WKT 2010 05 11 14 44 55 31.3200 -97.3300 251.000 122.0 167.093 3.950 -999.990 -999.990 1.671 ..P WKT 2010 05 11 14 49 55 31.3200 -97.3300 251.000 457.0 164.581 5.270 -999.990 -999.990 1.646 ..P WKT 2010 05 11 14 54 55 31.3200 -97.3300 251.000 30.0 157.604 5.530 -999.990 -999.990 1.576 ..P WKT 2010 05 11 14 59 55 31.3200 -97.3300 251.000 122.0 166.817 4.750 -999.990 -999.990 1.668 ..P WKT 2010 05 11 15 04 55 31.3200 -97.3300 251.000 457.0 160.677 4.310 -999.990 -999.990 1.607 ..P WKT 2010 05 11 15 14 55 31.3200 -97.3300 251.000 30.0 165.345 3.730 -999.990 -999.990 1.653 ..P WKT 2010 05 11 15 19 55 31.3200 -97.3300 251.000 122.0 167.778 5.650 -999.990 -999.990 1.678 ..P WKT 2010 05 11 15 24 55 31.3200 -97.3300 251.000 457.0 170.770 5.560 -999.990 -999.990 1.708 ..P WKT 2010 05 11 15 29 55 31.3200 -97.3300 251.000 30.0 169.854 5.070 -999.990 -999.990 1.699 ..P WKT 2010 05 11 15 34 55 31.3200 -97.3300 251.000 122.0 179.821 3.940 -999.990 -999.990 1.798 ..P WKT 2010 05 11 15 39 55 31.3200 -97.3300 251.000 457.0 185.045 3.230 -999.990 -999.990 1.850 ..P WKT 2010 05 11 15 49 55 31.3200 -97.3300 251.000 30.0 191.584 3.100 -999.990 -999.990 1.916 ..P WKT 2010 05 11 15 54 55 31.3200 -97.3300 251.000 122.0 188.156 3.550 -999.990 -999.990 1.882 ..P WKT 2010 05 11 15 59 55 31.3200 -97.3300 251.000 457.0 180.543 3.200 -999.990 -999.990 1.805 ..P WKT 2010 05 11 16 04 55 31.3200 -97.3300 251.000 30.0 182.975 3.590 -999.990 -999.990 1.830 ..P WKT 2010 05 11 16 09 55 31.3200 -97.3300 251.000 122.0 192.662 4.170 -999.990 -999.990 1.927 ..P WKT 2010 05 11 16 14 55 31.3200 -97.3300 251.000 457.0 188.955 4.770 -999.990 -999.990 1.890 ..P WKT 2010 05 11 16 24 55 31.3200 -97.3300 251.000 30.0 179.311 3.640 -999.990 -999.990 1.793 ..P WKT 2010 05 11 16 29 55 31.3200 -97.3300 251.000 122.0 187.044 4.920 -999.990 -999.990 1.870 ..P WKT 2010 05 11 16 34 55 31.3200 -97.3300 251.000 457.0 184.314 4.290 -999.990 -999.990 1.843 ..P WKT 2010 05 11 16 39 55 31.3200 -97.3300 251.000 30.0 189.954 3.310 -999.990 -999.990 1.900 ..P WKT 2010 05 11 16 44 55 31.3200 -97.3300 251.000 122.0 196.849 3.170 -999.990 -999.990 1.968 ..P WKT 2010 05 11 16 49 55 31.3200 -97.3300 251.000 457.0 187.145 5.160 -999.990 -999.990 1.871 ..P WKT 2010 05 11 17 04 55 31.3200 -97.3300 251.000 30.0 181.419 2.700 -999.990 -999.990 1.814 ..P WKT 2010 05 11 17 09 55 31.3200 -97.3300 251.000 122.0 185.778 3.900 -999.990 -999.990 1.858 ..P WKT 2010 05 11 17 14 55 31.3200 -97.3300 251.000 457.0 183.303 3.640 -999.990 -999.990 1.833 ..P WKT 2010 05 11 17 19 55 31.3200 -97.3300 251.000 30.0 177.062 3.610 -999.990 -999.990 1.771 ..P WKT 2010 05 11 17 24 55 31.3200 -97.3300 251.000 122.0 175.704 3.120 -999.990 -999.990 1.757 ..P WKT 2010 05 11 17 29 55 31.3200 -97.3300 251.000 457.0 176.157 3.500 -999.990 -999.990 1.762 ..P WKT 2010 05 11 17 39 55 31.3200 -97.3300 251.000 30.0 174.282 3.640 -999.990 -999.990 1.743 ..P WKT 2010 05 11 17 44 55 31.3200 -97.3300 251.000 122.0 185.756 3.340 -999.990 -999.990 1.858 ..P WKT 2010 05 11 17 49 55 31.3200 -97.3300 251.000 457.0 178.685 4.060 -999.990 -999.990 1.787 ..P WKT 2010 05 11 17 54 55 31.3200 -97.3300 251.000 30.0 178.726 4.010 -999.990 -999.990 1.787 ..P WKT 2010 05 11 17 59 55 31.3200 -97.3300 251.000 122.0 188.526 3.290 -999.990 -999.990 1.885 ..P WKT 2010 05 11 18 04 55 31.3200 -97.3300 251.000 457.0 175.461 3.040 -999.990 -999.990 1.755 ..P WKT 2010 05 11 18 14 55 31.3200 -97.3300 251.000 30.0 181.895 3.930 -999.990 -999.990 1.819 ..P WKT 2010 05 11 18 19 55 31.3200 -97.3300 251.000 122.0 182.294 2.940 -999.990 -999.990 1.823 ..P WKT 2010 05 11 18 24 55 31.3200 -97.3300 251.000 457.0 174.747 4.080 -999.990 -999.990 1.747 ..P WKT 2010 05 11 18 29 55 31.3200 -97.3300 251.000 30.0 174.450 3.590 -999.990 -999.990 1.744 ..P WKT 2010 05 11 18 34 55 31.3200 -97.3300 251.000 122.0 178.613 3.690 -999.990 -999.990 1.786 ..P WKT 2010 05 11 18 39 55 31.3200 -97.3300 251.000 457.0 170.508 3.000 -999.990 -999.990 1.705 ..P WKT 2010 05 11 18 49 55 31.3200 -97.3300 251.000 30.0 166.229 3.720 -999.990 -999.990 1.662 ..P WKT 2010 05 11 18 54 55 31.3200 -97.3300 251.000 122.0 169.496 2.840 -999.990 -999.990 1.695 ..P WKT 2010 05 11 18 59 55 31.3200 -97.3300 251.000 457.0 164.679 3.540 -999.990 -999.990 1.647 ..P WKT 2010 05 11 19 04 55 31.3200 -97.3300 251.000 30.0 161.534 4.350 -999.990 -999.990 1.615 ..P WKT 2010 05 11 19 09 55 31.3200 -97.3300 251.000 122.0 168.424 4.160 -999.990 -999.990 1.684 ..P WKT 2010 05 11 19 14 55 31.3200 -97.3300 251.000 457.0 165.280 2.850 -999.990 -999.990 1.653 ..P WKT 2010 05 11 19 24 55 31.3200 -97.3300 251.000 30.0 163.490 5.350 -999.990 -999.990 1.635 ..P WKT 2010 05 11 19 29 55 31.3200 -97.3300 251.000 122.0 163.173 4.020 -999.990 -999.990 1.632 ..P WKT 2010 05 11 19 34 55 31.3200 -97.3300 251.000 457.0 166.757 5.640 -999.990 -999.990 1.668 ..P WKT 2010 05 11 19 39 55 31.3200 -97.3300 251.000 30.0 155.849 3.750 -999.990 -999.990 1.558 ..P WKT 2010 05 11 19 44 55 31.3200 -97.3300 251.000 122.0 164.450 2.960 -999.990 -999.990 1.644 ..P WKT 2010 05 11 19 49 55 31.3200 -97.3300 251.000 457.0 159.953 4.340 -999.990 -999.990 1.600 ..P WKT 2010 05 11 19 59 55 31.3200 -97.3300 251.000 30.0 159.816 4.850 -999.990 -999.990 1.598 ..P WKT 2010 05 11 20 04 55 31.3200 -97.3300 251.000 122.0 166.127 3.280 -999.990 -999.990 1.661 ..P WKT 2010 05 11 20 09 55 31.3200 -97.3300 251.000 457.0 162.684 4.910 -999.990 -999.990 1.627 ..P WKT 2010 05 11 20 14 55 31.3200 -97.3300 251.000 30.0 159.521 4.370 -999.990 -999.990 1.595 ..P WKT 2010 05 11 20 19 55 31.3200 -97.3300 251.000 122.0 160.537 3.280 -999.990 -999.990 1.605 ..P WKT 2010 05 11 20 24 55 31.3200 -97.3300 251.000 457.0 157.932 3.550 -999.990 -999.990 1.579 ..P WKT 2010 05 11 20 34 55 31.3200 -97.3300 251.000 30.0 161.954 4.430 -999.990 -999.990 1.620 ..P WKT 2010 05 11 20 39 55 31.3200 -97.3300 251.000 122.0 169.835 3.730 -999.990 -999.990 1.698 ..P WKT 2010 05 11 20 44 55 31.3200 -97.3300 251.000 457.0 156.823 3.470 -999.990 -999.990 1.568 ..P WKT 2010 05 11 20 49 55 31.3200 -97.3300 251.000 30.0 163.868 4.140 -999.990 -999.990 1.639 ..P WKT 2010 05 11 20 54 55 31.3200 -97.3300 251.000 122.0 168.824 3.240 -999.990 -999.990 1.688 ..P WKT 2010 05 11 20 59 55 31.3200 -97.3300 251.000 457.0 166.258 4.480 -999.990 -999.990 1.663 ..P WKT 2010 05 11 21 09 55 31.3200 -97.3300 251.000 30.0 172.249 3.090 -999.990 -999.990 1.722 ..P WKT 2010 05 11 21 14 55 31.3200 -97.3300 251.000 122.0 174.399 3.120 -999.990 -999.990 1.744 ..P WKT 2010 05 11 21 19 55 31.3200 -97.3300 251.000 457.0 171.256 3.020 -999.990 -999.990 1.713 ..P WKT 2010 05 11 21 24 55 31.3200 -97.3300 251.000 30.0 167.835 3.470 -999.990 -999.990 1.678 ..P WKT 2010 05 11 21 29 55 31.3200 -97.3300 251.000 122.0 164.554 2.600 -999.990 -999.990 1.646 ..P WKT 2010 05 11 21 34 55 31.3200 -97.3300 251.000 457.0 153.335 2.750 -999.990 -999.990 1.533 ..P WKT 2010 05 11 21 44 55 31.3200 -97.3300 251.000 30.0 154.273 4.020 -999.990 -999.990 1.543 ..P WKT 2010 05 11 21 49 55 31.3200 -97.3300 251.000 122.0 154.036 2.700 -999.990 -999.990 1.540 ..P WKT 2010 05 11 21 54 55 31.3200 -97.3300 251.000 457.0 149.622 3.100 -999.990 -999.990 1.496 ..P WKT 2010 05 11 21 59 55 31.3200 -97.3300 251.000 30.0 148.689 3.410 -999.990 -999.990 1.487 ..P WKT 2010 05 11 22 04 55 31.3200 -97.3300 251.000 122.0 157.640 2.280 -999.990 -999.990 1.576 ..P WKT 2010 05 11 22 09 55 31.3200 -97.3300 251.000 457.0 146.126 2.190 -999.990 -999.990 1.461 ..P WKT 2010 05 11 22 19 55 31.3200 -97.3300 251.000 30.0 153.071 2.510 -999.990 -999.990 1.531 ..P WKT 2010 05 11 22 24 55 31.3200 -97.3300 251.000 122.0 151.760 2.820 -999.990 -999.990 1.518 ..P WKT 2010 05 11 22 29 55 31.3200 -97.3300 251.000 457.0 151.562 4.570 -999.990 -999.990 1.516 ..P WKT 2010 05 11 22 34 55 31.3200 -97.3300 251.000 30.0 148.859 3.690 -999.990 -999.990 1.489 ..P WKT 2010 05 11 22 39 55 31.3200 -97.3300 251.000 122.0 156.179 3.290 -999.990 -999.990 1.562 ..P WKT 2010 05 11 22 44 55 31.3200 -97.3300 251.000 457.0 145.681 3.860 -999.990 -999.990 1.457 ..P WKT 2010 05 11 22 54 55 31.3200 -97.3300 251.000 30.0 157.933 2.710 -999.990 -999.990 1.579 ..P WKT 2010 05 11 22 59 55 31.3200 -97.3300 251.000 122.0 158.133 5.210 -999.990 -999.990 1.581 ..P WKT 2010 05 11 23 04 55 31.3200 -97.3300 251.000 457.0 151.374 3.940 -999.990 -999.990 1.514 ..P WKT 2010 05 11 23 09 55 31.3200 -97.3300 251.000 30.0 156.584 3.570 -999.990 -999.990 1.566 ..P WKT 2010 05 11 23 14 55 31.3200 -97.3300 251.000 122.0 152.610 3.900 -999.990 -999.990 1.526 ..P WKT 2010 05 11 23 19 55 31.3200 -97.3300 251.000 457.0 157.820 4.590 -999.990 -999.990 1.578 ..P WKT 2010 05 11 23 29 55 31.3200 -97.3300 251.000 30.0 157.883 4.720 -999.990 -999.990 1.579 ..P WKT 2010 05 11 23 34 55 31.3200 -97.3300 251.000 122.0 156.910 4.220 -999.990 -999.990 1.569 ..P WKT 2010 05 11 23 39 55 31.3200 -97.3300 251.000 457.0 149.815 4.020 -999.990 -999.990 1.498 ..P WKT 2010 05 11 23 44 55 31.3200 -97.3300 251.000 30.0 148.842 6.490 -999.990 -999.990 1.488 ..P WKT 2010 05 11 23 49 55 31.3200 -97.3300 251.000 122.0 148.983 6.180 -999.990 -999.990 1.490 ..P WKT 2010 05 12 00 09 55 31.3200 -97.3300 251.000 457.0 147.428 3.250 -999.990 -999.990 1.474 ..P WKT 2010 05 12 00 10 25 31.3200 -97.3300 251.000 457.0 141.667 3.240 -999.990 -999.990 1.417 ..P WKT 2010 05 12 00 10 55 31.3200 -97.3300 251.000 457.0 143.975 3.930 -999.990 -999.990 1.440 ..P WKT 2010 05 12 00 11 25 31.3200 -97.3300 251.000 457.0 153.241 3.760 -999.990 -999.990 1.532 ..P WKT 2010 05 12 00 11 55 31.3200 -97.3300 251.000 457.0 152.211 4.070 -999.990 -999.990 1.522 ..P WKT 2010 05 12 00 12 25 31.3200 -97.3300 251.000 457.0 152.572 4.710 -999.990 -999.990 1.526 ..P WKT 2010 05 12 00 12 55 31.3200 -97.3300 251.000 457.0 145.698 4.180 -999.990 -999.990 1.457 ..P WKT 2010 05 12 00 13 25 31.3200 -97.3300 251.000 457.0 143.833 4.760 -999.990 -999.990 1.438 ..P WKT 2010 05 12 00 13 55 31.3200 -97.3300 251.000 457.0 140.297 5.510 -999.990 -999.990 1.403 ..P WKT 2010 05 12 00 14 25 31.3200 -97.3300 251.000 457.0 150.120 4.590 -999.990 -999.990 1.501 ..P WKT 2010 05 12 00 14 55 31.3200 -97.3300 251.000 457.0 150.203 5.330 -999.990 -999.990 1.502 ..P WKT 2010 05 12 00 19 55 31.3200 -97.3300 251.000 30.0 149.638 5.960 -999.990 -999.990 1.496 ..P WKT 2010 05 12 00 24 55 31.3200 -97.3300 251.000 122.0 152.413 6.640 -999.990 -999.990 1.524 ..P WKT 2010 05 12 00 29 55 31.3200 -97.3300 251.000 457.0 150.318 5.500 -999.990 -999.990 1.503 ..P WKT 2010 05 12 00 34 55 31.3200 -97.3300 251.000 30.0 157.267 3.540 -999.990 -999.990 1.573 ..P WKT 2010 05 12 00 39 55 31.3200 -97.3300 251.000 122.0 155.729 2.910 -999.990 -999.990 1.557 ..P WKT 2010 05 12 00 44 55 31.3200 -97.3300 251.000 457.0 147.093 3.800 -999.990 -999.990 1.471 ..P WKT 2010 05 12 00 54 55 31.3200 -97.3300 251.000 30.0 144.632 2.420 -999.990 -999.990 1.446 ..P WKT 2010 05 12 00 59 55 31.3200 -97.3300 251.000 122.0 151.920 2.650 -999.990 -999.990 1.519 ..P WKT 2010 05 12 01 04 55 31.3200 -97.3300 251.000 457.0 146.266 2.620 -999.990 -999.990 1.463 ..P WKT 2010 05 12 01 09 55 31.3200 -97.3300 251.000 30.0 149.796 2.880 -999.990 -999.990 1.498 ..P WKT 2010 05 12 01 14 55 31.3200 -97.3300 251.000 122.0 156.389 3.590 -999.990 -999.990 1.564 ..P WKT 2010 05 12 01 19 55 31.3200 -97.3300 251.000 457.0 142.524 2.480 -999.990 -999.990 1.425 ..P WKT 2010 05 12 01 29 55 31.3200 -97.3300 251.000 30.0 149.088 3.270 -999.990 -999.990 1.491 ..P WKT 2010 05 12 01 34 55 31.3200 -97.3300 251.000 122.0 156.297 2.760 -999.990 -999.990 1.563 ..P WKT 2010 05 12 01 39 55 31.3200 -97.3300 251.000 457.0 149.450 3.710 -999.990 -999.990 1.494 ..P WKT 2010 05 12 01 44 55 31.3200 -97.3300 251.000 30.0 148.170 2.760 -999.990 -999.990 1.482 ..P WKT 2010 05 12 01 49 55 31.3200 -97.3300 251.000 122.0 145.776 2.760 -999.990 -999.990 1.458 ..P WKT 2010 05 12 01 54 55 31.3200 -97.3300 251.000 457.0 141.990 2.700 -999.990 -999.990 1.420 ..P WKT 2010 05 12 02 04 55 31.3200 -97.3300 251.000 30.0 148.575 4.040 -999.990 -999.990 1.486 ..P WKT 2010 05 12 02 09 55 31.3200 -97.3300 251.000 122.0 146.001 3.240 -999.990 -999.990 1.460 ..P WKT 2010 05 12 02 14 55 31.3200 -97.3300 251.000 457.0 136.469 3.650 -999.990 -999.990 1.365 ..P WKT 2010 05 12 02 19 55 31.3200 -97.3300 251.000 30.0 152.686 3.740 -999.990 -999.990 1.527 ..P WKT 2010 05 12 02 24 55 31.3200 -97.3300 251.000 122.0 155.541 4.080 -999.990 -999.990 1.555 ..P WKT 2010 05 12 02 29 55 31.3200 -97.3300 251.000 457.0 133.899 5.130 -999.990 -999.990 1.339 ..P WKT 2010 05 12 02 39 55 31.3200 -97.3300 251.000 30.0 149.730 5.010 -999.990 -999.990 1.497 ..P WKT 2010 05 12 02 44 55 31.3200 -97.3300 251.000 122.0 151.711 5.650 -999.990 -999.990 1.517 ..P WKT 2010 05 12 02 49 55 31.3200 -97.3300 251.000 457.0 140.885 3.990 -999.990 -999.990 1.409 ..P WKT 2010 05 12 02 54 55 31.3200 -97.3300 251.000 30.0 150.661 5.410 -999.990 -999.990 1.507 ..P WKT 2010 05 12 02 59 55 31.3200 -97.3300 251.000 122.0 150.693 2.750 -999.990 -999.990 1.507 ..P WKT 2010 05 12 03 04 55 31.3200 -97.3300 251.000 457.0 149.054 2.190 -999.990 -999.990 1.491 ..P WKT 2010 05 12 03 14 55 31.3200 -97.3300 251.000 30.0 157.549 3.460 -999.990 -999.990 1.575 ..P WKT 2010 05 12 03 19 55 31.3200 -97.3300 251.000 122.0 159.331 3.060 -999.990 -999.990 1.593 ..P WKT 2010 05 12 03 24 55 31.3200 -97.3300 251.000 457.0 167.795 2.470 -999.990 -999.990 1.678 ..P WKT 2010 05 12 03 29 55 31.3200 -97.3300 251.000 30.0 155.377 2.710 -999.990 -999.990 1.554 ..P WKT 2010 05 12 03 34 55 31.3200 -97.3300 251.000 122.0 173.865 3.120 -999.990 -999.990 1.739 ..P WKT 2010 05 12 03 39 55 31.3200 -97.3300 251.000 457.0 170.357 4.180 -999.990 -999.990 1.704 ..P WKT 2010 05 12 03 49 55 31.3200 -97.3300 251.000 30.0 160.597 3.300 -999.990 -999.990 1.606 ..P WKT 2010 05 12 03 54 55 31.3200 -97.3300 251.000 122.0 160.470 3.130 -999.990 -999.990 1.605 ..P WKT 2010 05 12 03 59 55 31.3200 -97.3300 251.000 457.0 165.633 3.780 -999.990 -999.990 1.656 ..P WKT 2010 05 12 04 04 55 31.3200 -97.3300 251.000 30.0 167.176 3.350 -999.990 -999.990 1.672 ..P WKT 2010 05 12 04 09 55 31.3200 -97.3300 251.000 122.0 162.315 4.270 -999.990 -999.990 1.623 ..P WKT 2010 05 12 04 14 55 31.3200 -97.3300 251.000 457.0 167.201 4.500 -999.990 -999.990 1.672 ..P WKT 2010 05 12 04 24 55 31.3200 -97.3300 251.000 30.0 161.974 3.260 -999.990 -999.990 1.620 ..P WKT 2010 05 12 04 29 55 31.3200 -97.3300 251.000 122.0 168.152 3.980 -999.990 -999.990 1.682 ..P WKT 2010 05 12 04 34 55 31.3200 -97.3300 251.000 457.0 167.508 3.790 -999.990 -999.990 1.675 ..P WKT 2010 05 12 04 39 55 31.3200 -97.3300 251.000 30.0 163.521 4.010 -999.990 -999.990 1.635 ..P WKT 2010 05 12 04 44 55 31.3200 -97.3300 251.000 122.0 165.384 3.710 -999.990 -999.990 1.654 ..P WKT 2010 05 12 04 49 55 31.3200 -97.3300 251.000 457.0 171.423 5.230 -999.990 -999.990 1.714 ..P WKT 2010 05 12 05 04 55 31.3200 -97.3300 251.000 30.0 164.009 5.810 -999.990 -999.990 1.640 ..P WKT 2010 05 12 05 09 55 31.3200 -97.3300 251.000 122.0 172.183 3.050 -999.990 -999.990 1.722 ..P WKT 2010 05 12 05 14 55 31.3200 -97.3300 251.000 457.0 170.747 3.840 -999.990 -999.990 1.707 ..P WKT 2010 05 12 05 19 55 31.3200 -97.3300 251.000 30.0 162.767 3.430 -999.990 -999.990 1.628 ..P WKT 2010 05 12 05 24 55 31.3200 -97.3300 251.000 122.0 173.169 3.930 -999.990 -999.990 1.732 ..P WKT 2010 05 12 05 29 55 31.3200 -97.3300 251.000 457.0 176.329 3.090 -999.990 -999.990 1.763 ..P WKT 2010 05 12 05 39 55 31.3200 -97.3300 251.000 30.0 171.424 4.240 -999.990 -999.990 1.714 ..P WKT 2010 05 12 05 44 55 31.3200 -97.3300 251.000 122.0 175.475 3.420 -999.990 -999.990 1.755 ..P WKT 2010 05 12 05 49 55 31.3200 -97.3300 251.000 457.0 180.361 3.960 -999.990 -999.990 1.804 ..P WKT 2010 05 12 05 54 55 31.3200 -97.3300 251.000 30.0 175.778 3.900 -999.990 -999.990 1.758 ..P WKT 2010 05 12 05 59 55 31.3200 -97.3300 251.000 122.0 183.729 4.270 -999.990 -999.990 1.837 ..P WKT 2010 05 12 06 04 55 31.3200 -97.3300 251.000 457.0 188.337 3.170 -999.990 -999.990 1.883 ..P WKT 2010 05 12 06 14 55 31.3200 -97.3300 251.000 30.0 179.647 3.800 -999.990 -999.990 1.796 ..P WKT 2010 05 12 06 19 55 31.3200 -97.3300 251.000 122.0 188.354 3.720 -999.990 -999.990 1.884 ..P WKT 2010 05 12 06 24 55 31.3200 -97.3300 251.000 457.0 190.515 4.120 -999.990 -999.990 1.905 ..P WKT 2010 05 12 06 29 55 31.3200 -97.3300 251.000 30.0 174.849 4.420 -999.990 -999.990 1.748 ..P WKT 2010 05 12 06 34 55 31.3200 -97.3300 251.000 122.0 185.367 3.100 -999.990 -999.990 1.854 ..P WKT 2010 05 12 06 39 55 31.3200 -97.3300 251.000 457.0 188.642 2.510 -999.990 -999.990 1.886 ..P WKT 2010 05 12 06 49 55 31.3200 -97.3300 251.000 30.0 183.315 4.320 -999.990 -999.990 1.833 ..P WKT 2010 05 12 06 54 55 31.3200 -97.3300 251.000 122.0 195.047 3.830 -999.990 -999.990 1.950 ..P WKT 2010 05 12 06 59 55 31.3200 -97.3300 251.000 457.0 197.586 3.060 -999.990 -999.990 1.976 ..P WKT 2010 05 12 07 04 55 31.3200 -97.3300 251.000 30.0 187.590 3.030 -999.990 -999.990 1.876 ..P WKT 2010 05 12 07 09 55 31.3200 -97.3300 251.000 122.0 189.015 3.440 -999.990 -999.990 1.890 ..P WKT 2010 05 12 07 14 55 31.3200 -97.3300 251.000 457.0 203.813 3.870 -999.990 -999.990 2.038 ..P WKT 2010 05 12 07 24 55 31.3200 -97.3300 251.000 30.0 196.634 3.430 -999.990 -999.990 1.966 ..P WKT 2010 05 12 07 29 55 31.3200 -97.3300 251.000 122.0 194.158 3.050 -999.990 -999.990 1.942 ..P WKT 2010 05 12 07 34 55 31.3200 -97.3300 251.000 457.0 221.216 3.550 -999.990 -999.990 2.212 ..P WKT 2010 05 12 07 39 55 31.3200 -97.3300 251.000 30.0 193.666 3.220 -999.990 -999.990 1.937 ..P WKT 2010 05 12 07 44 55 31.3200 -97.3300 251.000 122.0 207.072 2.910 -999.990 -999.990 2.071 ..P WKT 2010 05 12 07 49 55 31.3200 -97.3300 251.000 457.0 227.165 3.900 -999.990 -999.990 2.272 ..P WKT 2010 05 12 07 59 55 31.3200 -97.3300 251.000 30.0 195.229 2.880 -999.990 -999.990 1.952 ..P WKT 2010 05 12 08 04 55 31.3200 -97.3300 251.000 122.0 207.282 3.140 -999.990 -999.990 2.073 ..P WKT 2010 05 12 08 09 55 31.3200 -97.3300 251.000 457.0 209.861 2.870 -999.990 -999.990 2.099 ..P WKT 2010 05 12 08 14 55 31.3200 -97.3300 251.000 30.0 207.984 2.720 -999.990 -999.990 2.080 ..P WKT 2010 05 12 08 19 55 31.3200 -97.3300 251.000 122.0 211.539 2.900 -999.990 -999.990 2.115 ..P WKT 2010 05 12 08 24 55 31.3200 -97.3300 251.000 457.0 217.323 3.390 -999.990 -999.990 2.173 ..P WKT 2010 05 12 08 34 55 31.3200 -97.3300 251.000 30.0 207.815 4.640 -999.990 -999.990 2.078 ..P WKT 2010 05 12 08 39 55 31.3200 -97.3300 251.000 122.0 210.216 3.130 -999.990 -999.990 2.102 ..P WKT 2010 05 12 08 44 55 31.3200 -97.3300 251.000 457.0 205.372 5.160 -999.990 -999.990 2.054 ..P WKT 2010 05 12 08 49 55 31.3200 -97.3300 251.000 30.0 209.027 3.440 -999.990 -999.990 2.090 ..P WKT 2010 05 12 08 54 55 31.3200 -97.3300 251.000 122.0 205.158 4.150 -999.990 -999.990 2.052 ..P WKT 2010 05 12 08 59 55 31.3200 -97.3300 251.000 457.0 207.838 3.520 -999.990 -999.990 2.078 ..P WKT 2010 05 12 09 09 55 31.3200 -97.3300 251.000 30.0 200.240 3.210 -999.990 -999.990 2.002 ..P WKT 2010 05 12 09 14 55 31.3200 -97.3300 251.000 122.0 206.263 3.280 -999.990 -999.990 2.063 ..P WKT 2010 05 12 09 19 55 31.3200 -97.3300 251.000 457.0 202.673 4.570 -999.990 -999.990 2.027 ..P WKT 2010 05 12 09 24 55 31.3200 -97.3300 251.000 30.0 202.984 4.670 -999.990 -999.990 2.030 ..P WKT 2010 05 12 09 29 55 31.3200 -97.3300 251.000 122.0 210.403 4.070 -999.990 -999.990 2.104 ..P WKT 2010 05 12 09 34 55 31.3200 -97.3300 251.000 457.0 202.353 4.520 -999.990 -999.990 2.024 ..P WKT 2010 05 12 09 44 55 31.3200 -97.3300 251.000 30.0 203.314 3.060 -999.990 -999.990 2.033 ..P WKT 2010 05 12 09 49 55 31.3200 -97.3300 251.000 122.0 202.430 3.820 -999.990 -999.990 2.024 ..P WKT 2010 05 12 09 54 55 31.3200 -97.3300 251.000 457.0 191.932 3.880 -999.990 -999.990 1.919 ..P WKT 2010 05 12 09 59 55 31.3200 -97.3300 251.000 30.0 197.877 3.670 -999.990 -999.990 1.979 ..P WKT 2010 05 12 10 04 55 31.3200 -97.3300 251.000 122.0 195.321 3.640 -999.990 -999.990 1.953 ..P WKT 2010 05 12 10 09 55 31.3200 -97.3300 251.000 457.0 184.125 3.080 -999.990 -999.990 1.841 ..P WKT 2010 05 12 10 19 55 31.3200 -97.3300 251.000 30.0 189.485 3.900 -999.990 -999.990 1.895 ..P WKT 2010 05 12 10 24 55 31.3200 -97.3300 251.000 122.0 187.646 3.030 -999.990 -999.990 1.876 ..P WKT 2010 05 12 10 29 55 31.3200 -97.3300 251.000 457.0 169.361 3.840 -999.990 -999.990 1.694 ..P WKT 2010 05 12 10 34 55 31.3200 -97.3300 251.000 30.0 179.508 5.100 -999.990 -999.990 1.795 ..P WKT 2010 05 12 10 39 55 31.3200 -97.3300 251.000 122.0 173.766 3.710 -999.990 -999.990 1.738 ..P WKT 2010 05 12 10 44 55 31.3200 -97.3300 251.000 457.0 157.989 4.500 -999.990 -999.990 1.580 ..P WKT 2010 05 12 10 54 55 31.3200 -97.3300 251.000 30.0 174.818 3.670 -999.990 -999.990 1.748 ..P WKT 2010 05 12 10 59 55 31.3200 -97.3300 251.000 122.0 172.580 4.580 -999.990 -999.990 1.726 ..P WKT 2010 05 12 11 04 55 31.3200 -97.3300 251.000 457.0 155.289 2.910 -999.990 -999.990 1.553 ..P WKT 2010 05 12 11 09 55 31.3200 -97.3300 251.000 30.0 177.582 3.950 -999.990 -999.990 1.776 ..P WKT 2010 05 12 11 14 55 31.3200 -97.3300 251.000 122.0 165.309 3.990 -999.990 -999.990 1.653 ..P WKT 2010 05 12 11 19 55 31.3200 -97.3300 251.000 457.0 148.574 2.690 -999.990 -999.990 1.486 ..P WKT 2010 05 12 11 29 55 31.3200 -97.3300 251.000 30.0 164.170 3.050 -999.990 -999.990 1.642 ..P WKT 2010 05 12 11 34 55 31.3200 -97.3300 251.000 122.0 161.096 2.830 -999.990 -999.990 1.611 ..P WKT 2010 05 12 11 39 55 31.3200 -97.3300 251.000 457.0 138.227 2.780 -999.990 -999.990 1.382 ..P WKT 2010 05 12 11 44 55 31.3200 -97.3300 251.000 30.0 151.044 3.180 -999.990 -999.990 1.510 ..P WKT 2010 05 12 11 49 55 31.3200 -97.3300 251.000 122.0 154.660 3.510 -999.990 -999.990 1.547 ..P WKT 2010 05 12 12 09 55 31.3200 -97.3300 251.000 457.0 131.245 3.990 -999.990 -999.990 1.312 ..P WKT 2010 05 12 12 10 25 31.3200 -97.3300 251.000 457.0 136.818 4.250 -999.990 -999.990 1.368 ..P WKT 2010 05 12 12 10 55 31.3200 -97.3300 251.000 457.0 133.747 4.160 -999.990 -999.990 1.337 ..P WKT 2010 05 12 12 11 25 31.3200 -97.3300 251.000 457.0 132.629 3.750 -999.990 -999.990 1.326 ..P WKT 2010 05 12 12 11 55 31.3200 -97.3300 251.000 457.0 135.413 3.910 -999.990 -999.990 1.354 ..P WKT 2010 05 12 12 12 25 31.3200 -97.3300 251.000 457.0 128.997 3.840 -999.990 -999.990 1.290 ..P WKT 2010 05 12 12 12 55 31.3200 -97.3300 251.000 457.0 134.569 3.950 -999.990 -999.990 1.346 ..P WKT 2010 05 12 12 13 25 31.3200 -97.3300 251.000 457.0 133.171 5.570 -999.990 -999.990 1.332 ..P WKT 2010 05 12 12 13 55 31.3200 -97.3300 251.000 457.0 140.695 6.720 -999.990 -999.990 1.407 ..P WKT 2010 05 12 12 14 25 31.3200 -97.3300 251.000 457.0 127.589 4.240 -999.990 -999.990 1.276 ..P WKT 2010 05 12 12 14 55 31.3200 -97.3300 251.000 457.0 132.882 3.850 -999.990 -999.990 1.329 ..P WKT 2010 05 12 12 19 55 31.3200 -97.3300 251.000 30.0 143.440 4.000 -999.990 -999.990 1.434 ..P WKT 2010 05 12 12 24 55 31.3200 -97.3300 251.000 122.0 144.240 3.830 -999.990 -999.990 1.442 ..P WKT 2010 05 12 12 29 55 31.3200 -97.3300 251.000 457.0 133.332 3.860 -999.990 -999.990 1.333 ..P WKT 2010 05 12 12 34 55 31.3200 -97.3300 251.000 30.0 139.708 3.990 -999.990 -999.990 1.397 ..P WKT 2010 05 12 12 39 55 31.3200 -97.3300 251.000 122.0 145.944 3.480 -999.990 -999.990 1.459 ..P WKT 2010 05 12 12 44 55 31.3200 -97.3300 251.000 457.0 133.922 3.290 -999.990 -999.990 1.339 ..P WKT 2010 05 12 12 54 55 31.3200 -97.3300 251.000 30.0 139.208 3.620 -999.990 -999.990 1.392 ..P WKT 2010 05 12 12 59 55 31.3200 -97.3300 251.000 122.0 135.332 4.190 -999.990 -999.990 1.353 ..P WKT 2010 05 12 13 04 55 31.3200 -97.3300 251.000 457.0 128.667 4.770 -999.990 -999.990 1.287 ..P WKT 2010 05 12 13 09 55 31.3200 -97.3300 251.000 30.0 127.857 5.690 -999.990 -999.990 1.279 ..P WKT 2010 05 12 13 14 55 31.3200 -97.3300 251.000 122.0 126.211 5.410 -999.990 -999.990 1.262 ..P WKT 2010 05 12 13 19 55 31.3200 -97.3300 251.000 457.0 124.843 3.320 -999.990 -999.990 1.248 ..P WKT 2010 05 12 13 29 55 31.3200 -97.3300 251.000 30.0 127.204 4.300 -999.990 -999.990 1.272 ..P WKT 2010 05 12 13 34 55 31.3200 -97.3300 251.000 122.0 124.244 4.660 -999.990 -999.990 1.242 ..P WKT 2010 05 12 13 39 55 31.3200 -97.3300 251.000 457.0 120.865 5.700 -999.990 -999.990 1.209 ..P WKT 2010 05 12 13 44 55 31.3200 -97.3300 251.000 30.0 119.298 4.360 -999.990 -999.990 1.193 ..P WKT 2010 05 12 13 49 55 31.3200 -97.3300 251.000 122.0 126.791 3.900 -999.990 -999.990 1.268 ..P WKT 2010 05 12 13 54 55 31.3200 -97.3300 251.000 457.0 125.503 4.200 -999.990 -999.990 1.255 ..P WKT 2010 05 12 14 04 55 31.3200 -97.3300 251.000 30.0 126.212 5.730 -999.990 -999.990 1.262 ..P WKT 2010 05 12 14 09 55 31.3200 -97.3300 251.000 122.0 129.464 4.750 -999.990 -999.990 1.295 ..P WKT 2010 05 12 14 14 55 31.3200 -97.3300 251.000 457.0 120.729 3.950 -999.990 -999.990 1.207 ..P WKT 2010 05 12 14 19 55 31.3200 -97.3300 251.000 30.0 133.737 4.220 -999.990 -999.990 1.337 ..P WKT 2010 05 12 14 24 55 31.3200 -97.3300 251.000 122.0 125.560 4.450 -999.990 -999.990 1.256 ..P WKT 2010 05 12 14 29 55 31.3200 -97.3300 251.000 457.0 122.958 3.640 -999.990 -999.990 1.230 ..P WKT 2010 05 12 14 39 55 31.3200 -97.3300 251.000 30.0 123.249 3.270 -999.990 -999.990 1.232 ..P WKT 2010 05 12 14 44 55 31.3200 -97.3300 251.000 122.0 123.354 3.490 -999.990 -999.990 1.234 ..P WKT 2010 05 12 14 49 55 31.3200 -97.3300 251.000 457.0 124.017 3.620 -999.990 -999.990 1.240 ..P WKT 2010 05 12 14 54 55 31.3200 -97.3300 251.000 30.0 122.172 3.800 -999.990 -999.990 1.222 ..P WKT 2010 05 12 14 59 55 31.3200 -97.3300 251.000 122.0 125.623 5.760 -999.990 -999.990 1.256 ..P WKT 2010 05 12 15 04 55 31.3200 -97.3300 251.000 457.0 120.153 3.850 -999.990 -999.990 1.202 ..P WKT 2010 05 12 15 14 55 31.3200 -97.3300 251.000 30.0 124.746 3.400 -999.990 -999.990 1.247 ..P WKT 2010 05 12 15 19 55 31.3200 -97.3300 251.000 122.0 124.771 3.310 -999.990 -999.990 1.248 ..P WKT 2010 05 12 15 24 55 31.3200 -97.3300 251.000 457.0 119.781 3.110 -999.990 -999.990 1.198 ..P WKT 2010 05 12 15 29 55 31.3200 -97.3300 251.000 30.0 116.183 3.230 -999.990 -999.990 1.162 ..P WKT 2010 05 12 15 34 55 31.3200 -97.3300 251.000 122.0 121.505 2.900 -999.990 -999.990 1.215 ..P WKT 2010 05 12 15 39 55 31.3200 -97.3300 251.000 457.0 117.351 3.170 -999.990 -999.990 1.174 ..P WKT 2010 05 12 15 49 55 31.3200 -97.3300 251.000 30.0 114.795 3.000 -999.990 -999.990 1.148 ..P WKT 2010 05 12 15 54 55 31.3200 -97.3300 251.000 122.0 127.542 4.720 -999.990 -999.990 1.275 ..P WKT 2010 05 12 15 59 55 31.3200 -97.3300 251.000 457.0 124.125 3.130 -999.990 -999.990 1.241 ..P WKT 2010 05 12 16 04 55 31.3200 -97.3300 251.000 30.0 124.888 3.590 -999.990 -999.990 1.249 ..P WKT 2010 05 12 16 09 55 31.3200 -97.3300 251.000 122.0 128.158 4.440 -999.990 -999.990 1.282 ..P WKT 2010 05 12 16 14 55 31.3200 -97.3300 251.000 457.0 122.929 2.880 -999.990 -999.990 1.229 ..P WKT 2010 05 12 16 24 55 31.3200 -97.3300 251.000 30.0 128.058 3.540 -999.990 -999.990 1.281 ..P WKT 2010 05 12 16 29 55 31.3200 -97.3300 251.000 122.0 131.030 3.650 -999.990 -999.990 1.310 ..P WKT 2010 05 12 16 34 55 31.3200 -97.3300 251.000 457.0 126.338 3.280 -999.990 -999.990 1.263 ..P WKT 2010 05 12 16 39 55 31.3200 -97.3300 251.000 30.0 130.982 3.530 -999.990 -999.990 1.310 ..P WKT 2010 05 12 16 44 55 31.3200 -97.3300 251.000 122.0 125.733 4.150 -999.990 -999.990 1.257 ..P WKT 2010 05 12 16 49 55 31.3200 -97.3300 251.000 457.0 117.001 2.830 -999.990 -999.990 1.170 ..P WKT 2010 05 12 17 04 55 31.3200 -97.3300 251.000 30.0 122.499 2.290 -999.990 -999.990 1.225 ..P WKT 2010 05 12 17 09 55 31.3200 -97.3300 251.000 122.0 125.643 3.730 -999.990 -999.990 1.256 ..P WKT 2010 05 12 17 14 55 31.3200 -97.3300 251.000 457.0 125.303 2.850 -999.990 -999.990 1.253 ..P WKT 2010 05 12 17 19 55 31.3200 -97.3300 251.000 30.0 125.381 3.080 -999.990 -999.990 1.254 ..P WKT 2010 05 12 17 24 55 31.3200 -97.3300 251.000 122.0 126.017 2.010 -999.990 -999.990 1.260 ..P WKT 2010 05 12 17 29 55 31.3200 -97.3300 251.000 457.0 124.563 1.710 -999.990 -999.990 1.246 ..P WKT 2010 05 12 17 39 55 31.3200 -97.3300 251.000 30.0 124.548 2.590 -999.990 -999.990 1.245 ..P WKT 2010 05 12 17 44 55 31.3200 -97.3300 251.000 122.0 129.610 3.450 -999.990 -999.990 1.296 ..P WKT 2010 05 12 17 49 55 31.3200 -97.3300 251.000 457.0 126.870 3.330 -999.990 -999.990 1.269 ..P WKT 2010 05 12 17 54 55 31.3200 -97.3300 251.000 30.0 127.473 3.040 -999.990 -999.990 1.275 ..P WKT 2010 05 12 17 59 55 31.3200 -97.3300 251.000 122.0 128.076 2.680 -999.990 -999.990 1.281 ..P WKT 2010 05 12 18 04 55 31.3200 -97.3300 251.000 457.0 123.524 2.770 -999.990 -999.990 1.235 ..P WKT 2010 05 12 18 14 55 31.3200 -97.3300 251.000 30.0 119.436 3.350 -999.990 -999.990 1.194 ..P WKT 2010 05 12 18 19 55 31.3200 -97.3300 251.000 122.0 129.096 5.770 -999.990 -999.990 1.291 ..P WKT 2010 05 12 18 24 55 31.3200 -97.3300 251.000 457.0 117.300 4.760 -999.990 -999.990 1.173 ..P WKT 2010 05 12 18 29 55 31.3200 -97.3300 251.000 30.0 125.008 5.670 -999.990 -999.990 1.250 ..P WKT 2010 05 12 18 34 55 31.3200 -97.3300 251.000 122.0 116.277 2.680 -999.990 -999.990 1.163 ..P WKT 2010 05 12 18 39 55 31.3200 -97.3300 251.000 457.0 119.528 3.390 -999.990 -999.990 1.195 ..P WKT 2010 05 12 18 49 55 31.3200 -97.3300 251.000 30.0 126.507 3.980 -999.990 -999.990 1.265 ..P WKT 2010 05 12 18 54 55 31.3200 -97.3300 251.000 122.0 127.449 3.320 -999.990 -999.990 1.274 ..P WKT 2010 05 12 18 59 55 31.3200 -97.3300 251.000 457.0 121.146 2.690 -999.990 -999.990 1.211 ..P WKT 2010 05 12 19 04 55 31.3200 -97.3300 251.000 30.0 125.988 2.960 -999.990 -999.990 1.260 ..P WKT 2010 05 12 19 09 55 31.3200 -97.3300 251.000 122.0 131.109 2.530 -999.990 -999.990 1.311 ..P WKT 2010 05 12 19 14 55 31.3200 -97.3300 251.000 457.0 127.035 3.350 -999.990 -999.990 1.270 ..P WKT 2010 05 12 19 24 55 31.3200 -97.3300 251.000 30.0 128.640 2.970 -999.990 -999.990 1.286 ..P WKT 2010 05 12 19 29 55 31.3200 -97.3300 251.000 122.0 138.497 3.980 -999.990 -999.990 1.385 ..P WKT 2010 05 12 19 34 55 31.3200 -97.3300 251.000 457.0 133.588 2.800 -999.990 -999.990 1.336 ..P WKT 2010 05 12 19 39 55 31.3200 -97.3300 251.000 30.0 132.022 2.500 -999.990 -999.990 1.320 ..P WKT 2010 05 12 19 44 55 31.3200 -97.3300 251.000 122.0 137.143 2.690 -999.990 -999.990 1.371 ..P WKT 2010 05 12 19 49 55 31.3200 -97.3300 251.000 457.0 141.427 3.390 -999.990 -999.990 1.414 ..P WKT 2010 05 12 19 59 55 31.3200 -97.3300 251.000 30.0 129.479 3.920 -999.990 -999.990 1.295 ..P WKT 2010 05 12 20 04 55 31.3200 -97.3300 251.000 122.0 139.157 1.900 -999.990 -999.990 1.392 ..P WKT 2010 05 12 20 09 55 31.3200 -97.3300 251.000 457.0 128.776 2.420 -999.990 -999.990 1.288 ..P WKT 2010 05 12 20 14 55 31.3200 -97.3300 251.000 30.0 132.603 2.310 -999.990 -999.990 1.326 ..P WKT 2010 05 12 20 19 55 31.3200 -97.3300 251.000 122.0 133.226 2.220 -999.990 -999.990 1.332 ..P WKT 2010 05 12 20 24 55 31.3200 -97.3300 251.000 457.0 131.620 1.920 -999.990 -999.990 1.316 ..P WKT 2010 05 12 20 34 55 31.3200 -97.3300 251.000 30.0 128.131 3.400 -999.990 -999.990 1.281 ..P WKT 2010 05 12 20 39 55 31.3200 -97.3300 251.000 122.0 139.340 2.460 -999.990 -999.990 1.393 ..P WKT 2010 05 12 20 44 55 31.3200 -97.3300 251.000 457.0 138.292 3.810 -999.990 -999.990 1.383 ..P WKT 2010 05 12 20 49 55 31.3200 -97.3300 251.000 30.0 132.647 2.110 -999.990 -999.990 1.326 ..P WKT 2010 05 12 20 54 55 31.3200 -97.3300 251.000 122.0 144.412 3.800 -999.990 -999.990 1.444 ..P WKT 2010 05 12 20 59 55 31.3200 -97.3300 251.000 457.0 139.046 3.600 -999.990 -999.990 1.390 ..P WKT 2010 05 12 21 09 55 31.3200 -97.3300 251.000 30.0 137.188 3.100 -999.990 -999.990 1.372 ..P WKT 2010 05 12 21 14 55 31.3200 -97.3300 251.000 122.0 145.989 2.780 -999.990 -999.990 1.460 ..P WKT 2010 05 12 21 19 55 31.3200 -97.3300 251.000 457.0 139.469 4.810 -999.990 -999.990 1.395 ..P WKT 2010 05 12 21 24 55 31.3200 -97.3300 251.000 30.0 137.823 2.860 -999.990 -999.990 1.378 ..P WKT 2010 05 12 21 29 55 31.3200 -97.3300 251.000 122.0 143.281 2.710 -999.990 -999.990 1.433 ..P WKT 2010 05 12 21 34 55 31.3200 -97.3300 251.000 457.0 144.700 3.480 -999.990 -999.990 1.447 ..P WKT 2010 05 12 21 44 55 31.3200 -97.3300 251.000 30.0 139.778 3.340 -999.990 -999.990 1.398 ..P WKT 2010 05 12 21 49 55 31.3200 -97.3300 251.000 122.0 147.922 3.200 -999.990 -999.990 1.479 ..P WKT 2010 05 12 21 54 55 31.3200 -97.3300 251.000 457.0 142.695 4.590 -999.990 -999.990 1.427 ..P WKT 2010 05 12 21 59 55 31.3200 -97.3300 251.000 30.0 138.304 3.600 -999.990 -999.990 1.383 ..P WKT 2010 05 12 22 04 55 31.3200 -97.3300 251.000 122.0 147.004 4.780 -999.990 -999.990 1.470 ..P WKT 2010 05 12 22 09 55 31.3200 -97.3300 251.000 457.0 149.577 4.970 -999.990 -999.990 1.496 ..P WKT 2010 05 12 22 19 55 31.3200 -97.3300 251.000 30.0 151.837 4.600 -999.990 -999.990 1.518 ..P WKT 2010 05 12 22 24 55 31.3200 -97.3300 251.000 122.0 160.019 4.620 -999.990 -999.990 1.600 ..P WKT 2010 05 12 22 29 55 31.3200 -97.3300 251.000 457.0 158.733 4.920 -999.990 -999.990 1.587 ..P WKT 2010 05 12 22 34 55 31.3200 -97.3300 251.000 30.0 162.180 5.190 -999.990 -999.990 1.622 ..P WKT 2010 05 12 22 39 55 31.3200 -97.3300 251.000 122.0 164.513 5.160 -999.990 -999.990 1.645 ..P WKT 2010 05 12 22 44 55 31.3200 -97.3300 251.000 457.0 154.592 6.510 -999.990 -999.990 1.546 ..P WKT 2010 05 12 22 54 55 31.3200 -97.3300 251.000 30.0 169.126 5.080 -999.990 -999.990 1.691 ..P WKT 2010 05 12 22 59 55 31.3200 -97.3300 251.000 122.0 168.515 5.070 -999.990 -999.990 1.685 ..P WKT 2010 05 12 23 04 55 31.3200 -97.3300 251.000 457.0 172.360 4.430 -999.990 -999.990 1.724 ..P WKT 2010 05 12 23 09 55 31.3200 -97.3300 251.000 30.0 172.863 4.550 -999.990 -999.990 1.729 ..P WKT 2010 05 12 23 14 55 31.3200 -97.3300 251.000 122.0 180.049 4.140 -999.990 -999.990 1.800 ..P WKT 2010 05 12 23 19 55 31.3200 -97.3300 251.000 457.0 175.818 4.730 -999.990 -999.990 1.758 ..P WKT 2010 05 12 23 29 55 31.3200 -97.3300 251.000 30.0 178.783 3.070 -999.990 -999.990 1.788 ..P WKT 2010 05 12 23 34 55 31.3200 -97.3300 251.000 122.0 191.271 3.330 -999.990 -999.990 1.913 ..P WKT 2010 05 12 23 39 55 31.3200 -97.3300 251.000 457.0 187.607 3.210 -999.990 -999.990 1.876 ..P WKT 2010 05 12 23 44 55 31.3200 -97.3300 251.000 30.0 192.017 3.680 -999.990 -999.990 1.920 ..P WKT 2010 05 12 23 49 55 31.3200 -97.3300 251.000 122.0 198.099 3.790 -999.990 -999.990 1.981 ..P WKT 2010 05 13 00 09 55 31.3200 -97.3300 251.000 457.0 200.217 3.490 -999.990 -999.990 2.002 ..P WKT 2010 05 13 00 10 25 31.3200 -97.3300 251.000 457.0 197.164 3.680 -999.990 -999.990 1.972 ..P WKT 2010 05 13 00 10 55 31.3200 -97.3300 251.000 457.0 201.073 3.750 -999.990 -999.990 2.011 ..P WKT 2010 05 13 00 11 25 31.3200 -97.3300 251.000 457.0 197.463 3.980 -999.990 -999.990 1.975 ..P WKT 2010 05 13 00 11 55 31.3200 -97.3300 251.000 457.0 194.271 3.470 -999.990 -999.990 1.943 ..P WKT 2010 05 13 00 12 25 31.3200 -97.3300 251.000 457.0 198.319 4.100 -999.990 -999.990 1.983 ..P WKT 2010 05 13 00 12 55 31.3200 -97.3300 251.000 457.0 196.798 3.990 -999.990 -999.990 1.968 ..P WKT 2010 05 13 00 13 25 31.3200 -97.3300 251.000 457.0 197.643 3.560 -999.990 -999.990 1.976 ..P WKT 2010 05 13 00 13 55 31.3200 -97.3300 251.000 457.0 200.160 3.980 -999.990 -999.990 2.002 ..P WKT 2010 05 13 00 14 25 31.3200 -97.3300 251.000 457.0 203.790 3.840 -999.990 -999.990 2.038 ..P WKT 2010 05 13 00 14 55 31.3200 -97.3300 251.000 457.0 198.370 4.060 -999.990 -999.990 1.984 ..P WKT 2010 05 13 00 19 55 31.3200 -97.3300 251.000 30.0 202.371 3.920 -999.990 -999.990 2.024 ..P WKT 2010 05 13 00 24 55 31.3200 -97.3300 251.000 122.0 201.777 3.780 -999.990 -999.990 2.018 ..P WKT 2010 05 13 00 29 55 31.3200 -97.3300 251.000 457.0 199.791 4.020 -999.990 -999.990 1.998 ..P WKT 2010 05 13 00 34 55 31.3200 -97.3300 251.000 30.0 192.931 3.720 -999.990 -999.990 1.929 ..P WKT 2010 05 13 00 39 55 31.3200 -97.3300 251.000 122.0 199.995 3.860 -999.990 -999.990 2.000 ..P WKT 2010 05 13 00 44 55 31.3200 -97.3300 251.000 457.0 196.339 5.020 -999.990 -999.990 1.963 ..P WKT 2010 05 13 00 54 55 31.3200 -97.3300 251.000 30.0 198.706 3.890 -999.990 -999.990 1.987 ..P WKT 2010 05 13 00 59 55 31.3200 -97.3300 251.000 122.0 201.668 4.470 -999.990 -999.990 2.017 ..P WKT 2010 05 13 01 04 55 31.3200 -97.3300 251.000 457.0 204.629 3.910 -999.990 -999.990 2.046 ..P WKT 2010 05 13 01 09 55 31.3200 -97.3300 251.000 30.0 199.516 3.630 -999.990 -999.990 1.995 ..P WKT 2010 05 13 01 14 55 31.3200 -97.3300 251.000 122.0 202.339 4.330 -999.990 -999.990 2.023 ..P WKT 2010 05 13 01 19 55 31.3200 -97.3300 251.000 457.0 208.224 4.100 -999.990 -999.990 2.082 ..P WKT 2010 05 13 01 29 55 31.3200 -97.3300 251.000 30.0 199.311 4.680 -999.990 -999.990 1.993 ..P WKT 2010 05 13 01 34 55 31.3200 -97.3300 251.000 122.0 197.878 3.420 -999.990 -999.990 1.979 ..P WKT 2010 05 13 01 39 55 31.3200 -97.3300 251.000 457.0 202.569 5.440 -999.990 -999.990 2.026 ..P WKT 2010 05 13 01 44 55 31.3200 -97.3300 251.000 30.0 201.832 3.520 -999.990 -999.990 2.018 ..P WKT 2010 05 13 01 49 55 31.3200 -97.3300 251.000 122.0 204.575 5.360 -999.990 -999.990 2.046 ..P WKT 2010 05 13 01 54 55 31.3200 -97.3300 251.000 457.0 195.068 3.410 -999.990 -999.990 1.951 ..P WKT 2010 05 13 02 04 55 31.3200 -97.3300 251.000 30.0 197.769 3.880 -999.990 -999.990 1.978 ..P WKT 2010 05 13 02 09 55 31.3200 -97.3300 251.000 122.0 200.233 3.130 -999.990 -999.990 2.002 ..P WKT 2010 05 13 02 14 55 31.3200 -97.3300 251.000 457.0 196.015 2.750 -999.990 -999.990 1.960 ..P WKT 2010 05 13 02 19 55 31.3200 -97.3300 251.000 30.0 196.253 3.160 -999.990 -999.990 1.963 ..P WKT 2010 05 13 02 24 55 31.3200 -97.3300 251.000 122.0 204.284 3.470 -999.990 -999.990 2.043 ..P WKT 2010 05 13 02 29 55 31.3200 -97.3300 251.000 457.0 204.521 2.490 -999.990 -999.990 2.045 ..P WKT 2010 05 13 02 39 55 31.3200 -97.3300 251.000 30.0 198.255 2.960 -999.990 -999.990 1.983 ..P WKT 2010 05 13 02 44 55 31.3200 -97.3300 251.000 122.0 203.164 2.870 -999.990 -999.990 2.032 ..P WKT 2010 05 13 02 49 55 31.3200 -97.3300 251.000 457.0 198.888 2.600 -999.990 -999.990 1.989 ..P WKT 2010 05 13 02 54 55 31.3200 -97.3300 251.000 30.0 204.354 3.320 -999.990 -999.990 2.044 ..P WKT 2010 05 13 02 59 55 31.3200 -97.3300 251.000 122.0 199.520 2.650 -999.990 -999.990 1.995 ..P WKT 2010 05 13 03 04 55 31.3200 -97.3300 251.000 457.0 198.863 3.050 -999.990 -999.990 1.989 ..P WKT 2010 05 13 03 14 55 31.3200 -97.3300 251.000 30.0 201.683 3.980 -999.990 -999.990 2.017 ..P WKT 2010 05 13 03 19 55 31.3200 -97.3300 251.000 122.0 204.326 5.120 -999.990 -999.990 2.043 ..P WKT 2010 05 13 03 24 55 31.3200 -97.3300 251.000 457.0 201.958 3.010 -999.990 -999.990 2.020 ..P WKT 2010 05 13 03 29 55 31.3200 -97.3300 251.000 30.0 199.034 3.320 -999.990 -999.990 1.990 ..P WKT 2010 05 13 03 34 55 31.3200 -97.3300 251.000 122.0 205.016 2.960 -999.990 -999.990 2.050 ..P WKT 2010 05 13 03 39 55 31.3200 -97.3300 251.000 457.0 210.442 3.040 -999.990 -999.990 2.104 ..P WKT 2010 05 13 03 49 55 31.3200 -97.3300 251.000 30.0 200.459 2.980 -999.990 -999.990 2.005 ..P WKT 2010 05 13 03 54 55 31.3200 -97.3300 251.000 122.0 196.183 3.440 -999.990 -999.990 1.962 ..P WKT 2010 05 13 03 59 55 31.3200 -97.3300 251.000 457.0 206.797 2.770 -999.990 -999.990 2.068 ..P WKT 2010 05 13 04 04 55 31.3200 -97.3300 251.000 30.0 189.997 5.340 -999.990 -999.990 1.900 ..P WKT 2010 05 13 04 09 55 31.3200 -97.3300 251.000 122.0 191.288 3.220 -999.990 -999.990 1.913 ..P WKT 2010 05 13 04 14 55 31.3200 -97.3300 251.000 457.0 192.717 3.110 -999.990 -999.990 1.927 ..P WKT 2010 05 13 04 24 55 31.3200 -97.3300 251.000 30.0 197.326 3.060 -999.990 -999.990 1.973 ..P WKT 2010 05 13 04 29 55 31.3200 -97.3300 251.000 122.0 199.808 3.610 -999.990 -999.990 1.998 ..P WKT 2010 05 13 04 34 55 31.3200 -97.3300 251.000 457.0 191.995 3.660 -999.990 -999.990 1.920 ..P WKT 2010 05 13 04 39 55 31.3200 -97.3300 251.000 30.0 190.165 3.460 -999.990 -999.990 1.902 ..P WKT 2010 05 13 04 44 55 31.3200 -97.3300 251.000 122.0 179.569 3.600 -999.990 -999.990 1.796 ..P WKT 2010 05 13 04 49 55 31.3200 -97.3300 251.000 457.0 188.174 2.470 -999.990 -999.990 1.882 ..P WKT 2010 05 13 05 04 55 31.3200 -97.3300 251.000 30.0 186.753 3.530 -999.990 -999.990 1.868 ..P WKT 2010 05 13 05 09 55 31.3200 -97.3300 251.000 122.0 191.967 3.920 -999.990 -999.990 1.920 ..P WKT 2010 05 13 05 14 55 31.3200 -97.3300 251.000 457.0 184.519 4.140 -999.990 -999.990 1.845 ..P WKT 2010 05 13 05 19 55 31.3200 -97.3300 251.000 30.0 186.811 2.950 -999.990 -999.990 1.868 ..P WKT 2010 05 13 05 24 55 31.3200 -97.3300 251.000 122.0 194.668 3.200 -999.990 -999.990 1.947 ..P WKT 2010 05 13 05 29 55 31.3200 -97.3300 251.000 457.0 186.803 3.410 -999.990 -999.990 1.868 ..P WKT 2010 05 13 05 39 55 31.3200 -97.3300 251.000 30.0 182.495 3.690 -999.990 -999.990 1.825 ..P WKT 2010 05 13 05 44 55 31.3200 -97.3300 251.000 122.0 180.903 3.520 -999.990 -999.990 1.809 ..P WKT 2010 05 13 05 49 55 31.3200 -97.3300 251.000 457.0 185.016 4.260 -999.990 -999.990 1.850 ..P WKT 2010 05 13 05 54 55 31.3200 -97.3300 251.000 30.0 178.138 3.610 -999.990 -999.990 1.781 ..P WKT 2010 05 13 05 59 55 31.3200 -97.3300 251.000 122.0 176.686 2.760 -999.990 -999.990 1.767 ..P WKT 2010 05 13 06 04 55 31.3200 -97.3300 251.000 457.0 180.102 2.290 -999.990 -999.990 1.801 ..P WKT 2010 05 13 06 14 55 31.3200 -97.3300 251.000 30.0 176.383 2.280 -999.990 -999.990 1.764 ..P WKT 2010 05 13 06 19 55 31.3200 -97.3300 251.000 122.0 174.812 2.680 -999.990 -999.990 1.748 ..P WKT 2010 05 13 06 24 55 31.3200 -97.3300 251.000 457.0 172.963 2.340 -999.990 -999.990 1.730 ..P WKT 2010 05 13 06 29 55 31.3200 -97.3300 251.000 30.0 170.000 2.440 -999.990 -999.990 1.700 ..P WKT 2010 05 13 06 34 55 31.3200 -97.3300 251.000 122.0 170.099 2.790 -999.990 -999.990 1.701 ..P WKT 2010 05 13 06 39 55 31.3200 -97.3300 251.000 457.0 166.301 2.650 -999.990 -999.990 1.663 ..P WKT 2010 05 13 06 49 55 31.3200 -97.3300 251.000 30.0 171.187 2.330 -999.990 -999.990 1.712 ..P WKT 2010 05 13 06 54 55 31.3200 -97.3300 251.000 122.0 172.637 2.290 -999.990 -999.990 1.726 ..P WKT 2010 05 13 06 59 55 31.3200 -97.3300 251.000 457.0 172.417 3.850 -999.990 -999.990 1.724 ..P WKT 2010 05 13 07 04 55 31.3200 -97.3300 251.000 30.0 173.309 3.550 -999.990 -999.990 1.733 ..P WKT 2010 05 13 07 09 55 31.3200 -97.3300 251.000 122.0 172.255 3.270 -999.990 -999.990 1.723 ..P WKT 2010 05 13 07 14 55 31.3200 -97.3300 251.000 457.0 170.366 2.380 -999.990 -999.990 1.704 ..P WKT 2010 05 13 07 24 55 31.3200 -97.3300 251.000 30.0 174.576 4.190 -999.990 -999.990 1.746 ..P WKT 2010 05 13 07 29 55 31.3200 -97.3300 251.000 122.0 177.058 3.360 -999.990 -999.990 1.771 ..P WKT 2010 05 13 07 34 55 31.3200 -97.3300 251.000 457.0 174.255 4.260 -999.990 -999.990 1.743 ..P WKT 2010 05 13 07 39 55 31.3200 -97.3300 251.000 30.0 175.346 3.190 -999.990 -999.990 1.753 ..P WKT 2010 05 13 07 44 55 31.3200 -97.3300 251.000 122.0 172.544 3.520 -999.990 -999.990 1.725 ..P WKT 2010 05 13 07 49 55 31.3200 -97.3300 251.000 457.0 168.350 3.810 -999.990 -999.990 1.683 ..P WKT 2010 05 13 07 59 55 31.3200 -97.3300 251.000 30.0 157.997 3.310 -999.990 -999.990 1.580 ..P WKT 2010 05 13 08 04 55 31.3200 -97.3300 251.000 122.0 167.690 4.630 -999.990 -999.990 1.677 ..P WKT 2010 05 13 08 09 55 31.3200 -97.3300 251.000 457.0 163.616 3.550 -999.990 -999.990 1.636 ..P WKT 2010 05 13 08 14 55 31.3200 -97.3300 251.000 30.0 160.934 3.410 -999.990 -999.990 1.609 ..P WKT 2010 05 13 08 19 55 31.3200 -97.3300 251.000 122.0 160.892 3.330 -999.990 -999.990 1.609 ..P WKT 2010 05 13 08 24 55 31.3200 -97.3300 251.000 457.0 155.985 3.290 -999.990 -999.990 1.560 ..P WKT 2010 05 13 08 34 55 31.3200 -97.3300 251.000 30.0 157.572 3.460 -999.990 -999.990 1.576 ..P WKT 2010 05 13 08 39 55 31.3200 -97.3300 251.000 122.0 154.750 2.780 -999.990 -999.990 1.548 ..P WKT 2010 05 13 08 44 55 31.3200 -97.3300 251.000 457.0 149.703 2.410 -999.990 -999.990 1.497 ..P WKT 2010 05 13 08 49 55 31.3200 -97.3300 251.000 30.0 147.438 2.440 -999.990 -999.990 1.474 ..P WKT 2010 05 13 08 54 55 31.3200 -97.3300 251.000 122.0 154.766 2.990 -999.990 -999.990 1.548 ..P WKT 2010 05 13 08 59 55 31.3200 -97.3300 251.000 457.0 147.635 1.980 -999.990 -999.990 1.476 ..P WKT 2010 05 13 09 09 55 31.3200 -97.3300 251.000 30.0 153.850 2.470 -999.990 -999.990 1.538 ..P WKT 2010 05 13 09 14 55 31.3200 -97.3300 251.000 122.0 156.768 2.900 -999.990 -999.990 1.568 ..P WKT 2010 05 13 09 19 55 31.3200 -97.3300 251.000 457.0 156.350 2.940 -999.990 -999.990 1.563 ..P WKT 2010 05 13 09 24 55 31.3200 -97.3300 251.000 30.0 154.959 4.030 -999.990 -999.990 1.550 ..P WKT 2010 05 13 09 29 55 31.3200 -97.3300 251.000 122.0 159.128 2.740 -999.990 -999.990 1.591 ..P WKT 2010 05 13 09 34 55 31.3200 -97.3300 251.000 457.0 159.267 2.980 -999.990 -999.990 1.593 ..P WKT 2010 05 13 09 44 55 31.3200 -97.3300 251.000 30.0 154.180 2.230 -999.990 -999.990 1.542 ..P WKT 2010 05 13 09 49 55 31.3200 -97.3300 251.000 122.0 154.377 2.850 -999.990 -999.990 1.544 ..P WKT 2010 05 13 09 54 55 31.3200 -97.3300 251.000 457.0 156.660 2.630 -999.990 -999.990 1.567 ..P WKT 2010 05 13 09 59 55 31.3200 -97.3300 251.000 30.0 158.803 2.340 -999.990 -999.990 1.588 ..P WKT 2010 05 13 10 04 55 31.3200 -97.3300 251.000 122.0 157.332 3.510 -999.990 -999.990 1.573 ..P WKT 2010 05 13 10 09 55 31.3200 -97.3300 251.000 457.0 161.145 2.870 -999.990 -999.990 1.611 ..P WKT 2010 05 13 10 19 55 31.3200 -97.3300 251.000 30.0 149.446 2.810 -999.990 -999.990 1.494 ..P WKT 2010 05 13 10 24 55 31.3200 -97.3300 251.000 122.0 156.177 2.820 -999.990 -999.990 1.562 ..P WKT 2010 05 13 10 29 55 31.3200 -97.3300 251.000 457.0 149.841 3.630 -999.990 -999.990 1.498 ..P WKT 2010 05 13 10 34 55 31.3200 -97.3300 251.000 30.0 145.729 4.350 -999.990 -999.990 1.457 ..P WKT 2010 05 13 10 39 55 31.3200 -97.3300 251.000 122.0 145.788 3.370 -999.990 -999.990 1.458 ..P WKT 2010 05 13 10 44 55 31.3200 -97.3300 251.000 457.0 149.183 2.490 -999.990 -999.990 1.492 ..P WKT 2010 05 13 10 54 55 31.3200 -97.3300 251.000 30.0 144.653 3.320 -999.990 -999.990 1.447 ..P WKT 2010 05 13 10 59 55 31.3200 -97.3300 251.000 122.0 149.239 3.480 -999.990 -999.990 1.492 ..P WKT 2010 05 13 11 04 55 31.3200 -97.3300 251.000 457.0 139.926 4.180 -999.990 -999.990 1.399 ..P WKT 2010 05 13 11 09 55 31.3200 -97.3300 251.000 30.0 143.400 5.050 -999.990 -999.990 1.434 ..P WKT 2010 05 13 11 14 55 31.3200 -97.3300 251.000 122.0 145.205 3.580 -999.990 -999.990 1.452 ..P WKT 2010 05 13 11 19 55 31.3200 -97.3300 251.000 457.0 139.784 2.490 -999.990 -999.990 1.398 ..P WKT 2010 05 13 11 29 55 31.3200 -97.3300 251.000 30.0 141.135 2.490 -999.990 -999.990 1.411 ..P WKT 2010 05 13 11 34 55 31.3200 -97.3300 251.000 122.0 145.961 3.250 -999.990 -999.990 1.460 ..P WKT 2010 05 13 11 39 55 31.3200 -97.3300 251.000 457.0 142.449 4.240 -999.990 -999.990 1.424 ..P WKT 2010 05 13 11 44 55 31.3200 -97.3300 251.000 30.0 141.716 4.290 -999.990 -999.990 1.417 ..P WKT 2010 05 13 11 49 55 31.3200 -97.3300 251.000 122.0 139.594 3.350 -999.990 -999.990 1.396 ..P WKT 2010 05 13 12 09 55 31.3200 -97.3300 251.000 457.0 137.078 3.940 -999.990 -999.990 1.371 ..P WKT 2010 05 13 12 10 25 31.3200 -97.3300 251.000 457.0 133.286 2.750 -999.990 -999.990 1.333 ..P WKT 2010 05 13 12 10 55 31.3200 -97.3300 251.000 457.0 132.968 3.000 -999.990 -999.990 1.330 ..P WKT 2010 05 13 12 11 25 31.3200 -97.3300 251.000 457.0 131.123 2.100 -999.990 -999.990 1.311 ..P WKT 2010 05 13 12 11 55 31.3200 -97.3300 251.000 457.0 136.365 3.380 -999.990 -999.990 1.364 ..P WKT 2010 05 13 12 12 25 31.3200 -97.3300 251.000 457.0 134.518 3.530 -999.990 -999.990 1.345 ..P WKT 2010 05 13 12 12 55 31.3200 -97.3300 251.000 457.0 133.924 3.080 -999.990 -999.990 1.339 ..P WKT 2010 05 13 12 13 25 31.3200 -97.3300 251.000 457.0 136.247 2.260 -999.990 -999.990 1.362 ..P WKT 2010 05 13 12 13 55 31.3200 -97.3300 251.000 457.0 132.455 3.430 -999.990 -999.990 1.325 ..P WKT 2010 05 13 12 14 25 31.3200 -97.3300 251.000 457.0 135.474 3.300 -999.990 -999.990 1.355 ..P WKT 2010 05 13 12 14 55 31.3200 -97.3300 251.000 457.0 135.574 3.100 -999.990 -999.990 1.356 ..P WKT 2010 05 13 12 19 55 31.3200 -97.3300 251.000 30.0 139.075 3.900 -999.990 -999.990 1.391 ..P WKT 2010 05 13 12 24 55 31.3200 -97.3300 251.000 122.0 138.961 2.580 -999.990 -999.990 1.390 ..P WKT 2010 05 13 12 29 55 31.3200 -97.3300 251.000 457.0 136.346 2.910 -999.990 -999.990 1.363 ..P WKT 2010 05 13 12 34 55 31.3200 -97.3300 251.000 30.0 131.782 3.180 -999.990 -999.990 1.318 ..P WKT 2010 05 13 12 39 55 31.3200 -97.3300 251.000 122.0 134.310 3.820 -999.990 -999.990 1.343 ..P WKT 2010 05 13 12 44 55 31.3200 -97.3300 251.000 457.0 132.388 3.800 -999.990 -999.990 1.324 ..P WKT 2010 05 13 12 54 55 31.3200 -97.3300 251.000 30.0 129.854 4.550 -999.990 -999.990 1.299 ..P WKT 2010 05 13 12 59 55 31.3200 -97.3300 251.000 122.0 130.634 5.510 -999.990 -999.990 1.306 ..P WKT 2010 05 13 13 04 55 31.3200 -97.3300 251.000 457.0 127.518 2.760 -999.990 -999.990 1.275 ..P WKT 2010 05 13 13 09 55 31.3200 -97.3300 251.000 30.0 128.855 3.070 -999.990 -999.990 1.289 ..P WKT 2010 05 13 13 14 55 31.3200 -97.3300 251.000 122.0 127.129 2.770 -999.990 -999.990 1.271 ..P WKT 2010 05 13 13 19 55 31.3200 -97.3300 251.000 457.0 118.860 2.490 -999.990 -999.990 1.189 ..P WKT 2010 05 13 13 29 55 31.3200 -97.3300 251.000 30.0 121.612 2.290 -999.990 -999.990 1.216 ..P WKT 2010 05 13 13 34 55 31.3200 -97.3300 251.000 122.0 126.092 3.550 -999.990 -999.990 1.261 ..P WKT 2010 05 13 13 39 55 31.3200 -97.3300 251.000 457.0 116.506 1.830 -999.990 -999.990 1.165 ..P WKT 2010 05 13 13 44 55 31.3200 -97.3300 251.000 30.0 123.216 2.260 -999.990 -999.990 1.232 ..P WKT 2010 05 13 13 49 55 31.3200 -97.3300 251.000 122.0 118.085 2.040 -999.990 -999.990 1.181 ..P WKT 2010 05 13 13 54 55 31.3200 -97.3300 251.000 457.0 118.665 2.520 -999.990 -999.990 1.187 ..P WKT 2010 05 13 14 04 55 31.3200 -97.3300 251.000 30.0 118.751 1.900 -999.990 -999.990 1.188 ..P WKT 2010 05 13 14 09 55 31.3200 -97.3300 251.000 122.0 127.457 2.810 -999.990 -999.990 1.275 ..P WKT 2010 05 13 14 14 55 31.3200 -97.3300 251.000 457.0 113.023 1.920 -999.990 -999.990 1.130 ..P WKT 2010 05 13 14 19 55 31.3200 -97.3300 251.000 30.0 121.730 1.820 -999.990 -999.990 1.217 ..P WKT 2010 05 13 14 24 55 31.3200 -97.3300 251.000 122.0 124.583 4.430 -999.990 -999.990 1.246 ..P WKT 2010 05 13 14 29 55 31.3200 -97.3300 251.000 457.0 119.626 3.240 -999.990 -999.990 1.196 ..P WKT 2010 05 13 14 39 55 31.3200 -97.3300 251.000 30.0 126.488 1.930 -999.990 -999.990 1.265 ..P WKT 2010 05 13 14 44 55 31.3200 -97.3300 251.000 122.0 122.408 1.680 -999.990 -999.990 1.224 ..P WKT 2010 05 13 14 49 55 31.3200 -97.3300 251.000 457.0 117.488 1.780 -999.990 -999.990 1.175 ..P WKT 2010 05 13 14 54 55 31.3200 -97.3300 251.000 30.0 119.545 2.780 -999.990 -999.990 1.195 ..P WKT 2010 05 13 14 59 55 31.3200 -97.3300 251.000 122.0 124.951 2.080 -999.990 -999.990 1.250 ..P WKT 2010 05 13 15 04 55 31.3200 -97.3300 251.000 457.0 115.563 1.960 -999.990 -999.990 1.156 ..P WKT 2010 05 13 15 14 55 31.3200 -97.3300 251.000 30.0 118.642 3.100 -999.990 -999.990 1.186 ..P WKT 2010 05 13 15 19 55 31.3200 -97.3300 251.000 122.0 120.500 3.160 -999.990 -999.990 1.205 ..P WKT 2010 05 13 15 24 55 31.3200 -97.3300 251.000 457.0 121.521 2.260 -999.990 -999.990 1.215 ..P WKT 2010 05 13 15 29 55 31.3200 -97.3300 251.000 30.0 117.515 2.260 -999.990 -999.990 1.175 ..P WKT 2010 05 13 15 34 55 31.3200 -97.3300 251.000 122.0 121.888 2.750 -999.990 -999.990 1.219 ..P WKT 2010 05 13 15 39 55 31.3200 -97.3300 251.000 457.0 117.322 3.410 -999.990 -999.990 1.173 ..P WKT 2010 05 13 15 49 55 31.3200 -97.3300 251.000 30.0 112.377 2.710 -999.990 -999.990 1.124 ..P WKT 2010 05 13 15 54 55 31.3200 -97.3300 251.000 122.0 120.945 2.270 -999.990 -999.990 1.209 ..P WKT 2010 05 13 15 59 55 31.3200 -97.3300 251.000 457.0 111.904 3.510 -999.990 -999.990 1.119 ..P WKT 2010 05 13 16 04 55 31.3200 -97.3300 251.000 30.0 115.721 2.170 -999.990 -999.990 1.157 ..P WKT 2010 05 13 16 09 55 31.3200 -97.3300 251.000 122.0 117.721 2.170 -999.990 -999.990 1.177 ..P WKT 2010 05 13 16 14 55 31.3200 -97.3300 251.000 457.0 112.451 3.740 -999.990 -999.990 1.125 ..P WKT 2010 05 13 16 24 55 31.3200 -97.3300 251.000 30.0 112.796 2.070 -999.990 -999.990 1.128 ..P WKT 2010 05 13 16 29 55 31.3200 -97.3300 251.000 122.0 120.372 2.520 -999.990 -999.990 1.204 ..P WKT 2010 05 13 16 34 55 31.3200 -97.3300 251.000 457.0 115.780 2.400 -999.990 -999.990 1.158 ..P WKT 2010 05 13 16 39 55 31.3200 -97.3300 251.000 30.0 120.280 2.640 -999.990 -999.990 1.203 ..P WKT 2010 05 13 16 44 55 31.3200 -97.3300 251.000 122.0 122.403 2.330 -999.990 -999.990 1.224 ..P WKT 2010 05 13 16 49 55 31.3200 -97.3300 251.000 457.0 122.287 3.540 -999.990 -999.990 1.223 ..P WKT 2010 05 13 17 04 55 31.3200 -97.3300 251.000 30.0 113.679 2.370 -999.990 -999.990 1.137 ..P WKT 2010 05 13 17 09 55 31.3200 -97.3300 251.000 122.0 113.771 4.310 -999.990 -999.990 1.138 ..P WKT 2010 05 13 17 14 55 31.3200 -97.3300 251.000 457.0 115.965 5.040 -999.990 -999.990 1.160 ..P WKT 2010 05 13 17 19 55 31.3200 -97.3300 251.000 30.0 109.896 5.270 -999.990 -999.990 1.099 ..P WKT 2010 05 13 17 24 55 31.3200 -97.3300 251.000 122.0 108.448 4.480 -999.990 -999.990 1.084 ..P WKT 2010 05 13 17 29 55 31.3200 -97.3300 251.000 457.0 108.680 3.850 -999.990 -999.990 1.087 ..P WKT 2010 05 13 17 39 55 31.3200 -97.3300 251.000 30.0 112.177 3.960 -999.990 -999.990 1.122 ..P WKT 2010 05 13 17 44 55 31.3200 -97.3300 251.000 122.0 113.902 4.360 -999.990 -999.990 1.139 ..P WKT 2010 05 13 17 49 55 31.3200 -97.3300 251.000 457.0 114.366 4.870 -999.990 -999.990 1.144 ..P WKT 2010 05 13 17 54 55 31.3200 -97.3300 251.000 30.0 120.436 6.550 -999.990 -999.990 1.204 ..P WKT 2010 05 13 17 59 55 31.3200 -97.3300 251.000 122.0 120.901 5.270 -999.990 -999.990 1.209 ..P WKT 2010 05 13 18 04 55 31.3200 -97.3300 251.000 457.0 120.243 3.560 -999.990 -999.990 1.202 ..P WKT 2010 05 13 18 14 55 31.3200 -97.3300 251.000 30.0 115.362 3.360 -999.990 -999.990 1.154 ..P WKT 2010 05 13 18 19 55 31.3200 -97.3300 251.000 122.0 128.249 4.920 -999.990 -999.990 1.282 ..P WKT 2010 05 13 18 24 55 31.3200 -97.3300 251.000 457.0 121.220 6.000 -999.990 -999.990 1.212 ..P WKT 2010 05 13 18 29 55 31.3200 -97.3300 251.000 30.0 119.520 5.000 -999.990 -999.990 1.195 ..P WKT 2010 05 13 18 34 55 31.3200 -97.3300 251.000 122.0 120.346 3.020 -999.990 -999.990 1.203 ..P WKT 2010 05 13 18 39 55 31.3200 -97.3300 251.000 457.0 113.313 3.730 -999.990 -999.990 1.133 ..P WKT 2010 05 13 18 49 55 31.3200 -97.3300 251.000 30.0 113.680 3.180 -999.990 -999.990 1.137 ..P WKT 2010 05 13 18 54 55 31.3200 -97.3300 251.000 122.0 117.714 3.070 -999.990 -999.990 1.177 ..P WKT 2010 05 13 18 59 55 31.3200 -97.3300 251.000 457.0 118.098 3.320 -999.990 -999.990 1.181 ..P WKT 2010 05 13 19 04 55 31.3200 -97.3300 251.000 30.0 118.201 2.960 -999.990 -999.990 1.182 ..P WKT 2010 05 13 19 09 55 31.3200 -97.3300 251.000 122.0 122.237 3.190 -999.990 -999.990 1.222 ..P WKT 2010 05 13 19 14 55 31.3200 -97.3300 251.000 457.0 116.162 2.230 -999.990 -999.990 1.162 ..P WKT 2010 05 13 19 24 55 31.3200 -97.3300 251.000 30.0 116.309 5.970 -999.990 -999.990 1.163 ..P WKT 2010 05 13 19 29 55 31.3200 -97.3300 251.000 122.0 110.452 4.960 -999.990 -999.990 1.105 ..P WKT 2010 05 13 19 34 55 31.3200 -97.3300 251.000 457.0 120.892 3.730 -999.990 -999.990 1.209 ..P WKT 2010 05 13 19 39 55 31.3200 -97.3300 251.000 30.0 125.995 4.020 -999.990 -999.990 1.260 ..P WKT 2010 05 13 19 44 55 31.3200 -97.3300 251.000 122.0 122.948 3.230 -999.990 -999.990 1.229 ..P WKT 2010 05 13 19 49 55 31.3200 -97.3300 251.000 457.0 126.365 4.120 -999.990 -999.990 1.264 ..P WKT 2010 05 13 19 59 55 31.3200 -97.3300 251.000 30.0 121.112 4.170 -999.990 -999.990 1.211 ..P WKT 2010 05 13 20 04 55 31.3200 -97.3300 251.000 122.0 117.078 3.680 -999.990 -999.990 1.171 ..P WKT 2010 05 13 20 09 55 31.3200 -97.3300 251.000 457.0 110.794 4.520 -999.990 -999.990 1.108 ..P WKT 2010 05 13 20 14 55 31.3200 -97.3300 251.000 30.0 115.337 4.640 -999.990 -999.990 1.153 ..P WKT 2010 05 13 20 19 55 31.3200 -97.3300 251.000 122.0 119.038 3.950 -999.990 -999.990 1.190 ..P WKT 2010 05 13 20 24 55 31.3200 -97.3300 251.000 457.0 120.629 3.280 -999.990 -999.990 1.206 ..P WKT 2010 05 13 20 34 55 31.3200 -97.3300 251.000 30.0 115.168 2.710 -999.990 -999.990 1.152 ..P WKT 2010 05 13 20 39 55 31.3200 -97.3300 251.000 122.0 116.559 4.330 -999.990 -999.990 1.166 ..P WKT 2010 05 13 20 44 55 31.3200 -97.3300 251.000 457.0 119.216 3.870 -999.990 -999.990 1.192 ..P WKT 2010 05 13 20 49 55 31.3200 -97.3300 251.000 30.0 120.749 3.200 -999.990 -999.990 1.207 ..P WKT 2010 05 13 20 54 55 31.3200 -97.3300 251.000 122.0 122.140 2.940 -999.990 -999.990 1.221 ..P WKT 2010 05 13 20 59 55 31.3200 -97.3300 251.000 457.0 119.589 3.610 -999.990 -999.990 1.196 ..P WKT 2010 05 13 21 09 55 31.3200 -97.3300 251.000 30.0 125.855 3.540 -999.990 -999.990 1.259 ..P WKT 2010 05 13 21 14 55 31.3200 -97.3300 251.000 122.0 124.108 2.390 -999.990 -999.990 1.241 ..P WKT 2010 05 13 21 19 55 31.3200 -97.3300 251.000 457.0 118.981 4.770 -999.990 -999.990 1.190 ..P WKT 2010 05 13 21 24 55 31.3200 -97.3300 251.000 30.0 118.360 4.250 -999.990 -999.990 1.184 ..P WKT 2010 05 13 21 29 55 31.3200 -97.3300 251.000 122.0 119.995 3.250 -999.990 -999.990 1.200 ..P WKT 2010 05 13 21 34 55 31.3200 -97.3300 251.000 457.0 116.978 2.310 -999.990 -999.990 1.170 ..P WKT 2010 05 13 21 44 55 31.3200 -97.3300 251.000 30.0 117.388 3.660 -999.990 -999.990 1.174 ..P WKT 2010 05 13 21 49 55 31.3200 -97.3300 251.000 122.0 119.405 2.210 -999.990 -999.990 1.194 ..P WKT 2010 05 13 21 54 55 31.3200 -97.3300 251.000 457.0 121.705 2.370 -999.990 -999.990 1.217 ..P WKT 2010 05 13 21 59 55 31.3200 -97.3300 251.000 30.0 120.903 2.230 -999.990 -999.990 1.209 ..P WKT 2010 05 13 22 04 55 31.3200 -97.3300 251.000 122.0 125.178 1.950 -999.990 -999.990 1.252 ..P WKT 2010 05 13 22 09 55 31.3200 -97.3300 251.000 457.0 118.735 2.360 -999.990 -999.990 1.187 ..P WKT 2010 05 13 22 19 55 31.3200 -97.3300 251.000 30.0 126.018 2.340 -999.990 -999.990 1.260 ..P WKT 2010 05 13 22 24 55 31.3200 -97.3300 251.000 122.0 122.817 2.520 -999.990 -999.990 1.228 ..P WKT 2010 05 13 22 29 55 31.3200 -97.3300 251.000 457.0 127.236 2.510 -999.990 -999.990 1.272 ..P WKT 2010 05 13 22 34 55 31.3200 -97.3300 251.000 30.0 119.236 2.020 -999.990 -999.990 1.192 ..P WKT 2010 05 13 22 39 55 31.3200 -97.3300 251.000 122.0 124.503 2.250 -999.990 -999.990 1.245 ..P WKT 2010 05 13 22 44 55 31.3200 -97.3300 251.000 457.0 113.959 2.160 -999.990 -999.990 1.140 ..P WKT 2010 05 13 22 54 55 31.3200 -97.3300 251.000 30.0 124.939 2.050 -999.990 -999.990 1.249 ..P WKT 2010 05 13 22 59 55 31.3200 -97.3300 251.000 122.0 130.653 2.720 -999.990 -999.990 1.307 ..P WKT 2010 05 13 23 04 55 31.3200 -97.3300 251.000 457.0 126.199 3.020 -999.990 -999.990 1.262 ..P WKT 2010 05 13 23 09 55 31.3200 -97.3300 251.000 30.0 126.547 2.730 -999.990 -999.990 1.265 ..P WKT 2010 05 13 23 14 55 31.3200 -97.3300 251.000 122.0 127.742 1.950 -999.990 -999.990 1.277 ..P WKT 2010 05 13 23 19 55 31.3200 -97.3300 251.000 457.0 129.220 2.200 -999.990 -999.990 1.292 ..P WKT 2010 05 13 23 29 55 31.3200 -97.3300 251.000 30.0 126.184 1.960 -999.990 -999.990 1.262 ..P WKT 2010 05 13 23 34 55 31.3200 -97.3300 251.000 122.0 138.629 3.570 -999.990 -999.990 1.386 ..P WKT 2010 05 13 23 39 55 31.3200 -97.3300 251.000 457.0 136.941 2.660 -999.990 -999.990 1.369 ..P WKT 2010 05 13 23 44 55 31.3200 -97.3300 251.000 30.0 132.708 2.970 -999.990 -999.990 1.327 ..P WKT 2010 05 13 23 49 55 31.3200 -97.3300 251.000 122.0 130.736 2.990 -999.990 -999.990 1.307 ..P WKT 2010 05 14 00 09 55 31.3200 -97.3300 251.000 457.0 143.926 2.340 -999.990 -999.990 1.439 ..P WKT 2010 05 14 00 10 25 31.3200 -97.3300 251.000 457.0 144.246 3.440 -999.990 -999.990 1.442 ..P WKT 2010 05 14 00 10 55 31.3200 -97.3300 251.000 457.0 142.728 4.070 -999.990 -999.990 1.427 ..P WKT 2010 05 14 00 11 25 31.3200 -97.3300 251.000 457.0 145.594 3.460 -999.990 -999.990 1.456 ..P WKT 2010 05 14 00 11 55 31.3200 -97.3300 251.000 457.0 143.087 2.250 -999.990 -999.990 1.431 ..P WKT 2010 05 14 00 12 25 31.3200 -97.3300 251.000 457.0 143.972 2.180 -999.990 -999.990 1.440 ..P WKT 2010 05 14 00 12 55 31.3200 -97.3300 251.000 457.0 140.051 2.910 -999.990 -999.990 1.401 ..P WKT 2010 05 14 00 13 25 31.3200 -97.3300 251.000 457.0 143.482 2.610 -999.990 -999.990 1.435 ..P WKT 2010 05 14 00 13 55 31.3200 -97.3300 251.000 457.0 139.278 3.680 -999.990 -999.990 1.393 ..P WKT 2010 05 14 00 14 25 31.3200 -97.3300 251.000 457.0 138.750 3.660 -999.990 -999.990 1.387 ..P WKT 2010 05 14 00 14 55 31.3200 -97.3300 251.000 457.0 139.212 3.150 -999.990 -999.990 1.392 ..P WKT 2010 05 14 00 19 55 31.3200 -97.3300 251.000 30.0 139.588 3.340 -999.990 -999.990 1.396 ..P WKT 2010 05 14 00 24 55 31.3200 -97.3300 251.000 122.0 154.233 3.330 -999.990 -999.990 1.542 ..P WKT 2010 05 14 00 29 55 31.3200 -97.3300 251.000 457.0 149.237 5.120 -999.990 -999.990 1.492 ..P WKT 2010 05 14 00 34 55 31.3200 -97.3300 251.000 30.0 148.199 4.190 -999.990 -999.990 1.482 ..P WKT 2010 05 14 00 39 55 31.3200 -97.3300 251.000 122.0 156.055 4.620 -999.990 -999.990 1.561 ..P WKT 2010 05 14 00 44 55 31.3200 -97.3300 251.000 457.0 149.793 5.240 -999.990 -999.990 1.498 ..P WKT 2010 05 14 00 54 55 31.3200 -97.3300 251.000 30.0 157.426 5.450 -999.990 -999.990 1.574 ..P WKT 2010 05 14 00 59 55 31.3200 -97.3300 251.000 122.0 158.760 5.350 -999.990 -999.990 1.588 ..P WKT 2010 05 14 01 04 55 31.3200 -97.3300 251.000 457.0 161.785 5.810 -999.990 -999.990 1.618 ..P WKT 2010 05 14 01 09 55 31.3200 -97.3300 251.000 30.0 161.989 5.490 -999.990 -999.990 1.620 ..P WKT 2010 05 14 01 14 55 31.3200 -97.3300 251.000 122.0 170.086 5.210 -999.990 -999.990 1.701 ..P WKT 2010 05 14 01 19 55 31.3200 -97.3300 251.000 457.0 177.334 5.200 -999.990 -999.990 1.773 ..P WKT 2010 05 14 01 29 55 31.3200 -97.3300 251.000 30.0 169.927 4.330 -999.990 -999.990 1.699 ..P WKT 2010 05 14 01 34 55 31.3200 -97.3300 251.000 122.0 178.941 4.420 -999.990 -999.990 1.789 ..P WKT 2010 05 14 01 39 55 31.3200 -97.3300 251.000 457.0 188.936 3.580 -999.990 -999.990 1.889 ..P WKT 2010 05 14 01 44 55 31.3200 -97.3300 251.000 30.0 184.147 4.380 -999.990 -999.990 1.841 ..P WKT 2010 05 14 01 49 55 31.3200 -97.3300 251.000 122.0 193.151 2.950 -999.990 -999.990 1.932 ..P WKT 2010 05 14 01 54 55 31.3200 -97.3300 251.000 457.0 201.306 2.420 -999.990 -999.990 2.013 ..P WKT 2010 05 14 02 04 55 31.3200 -97.3300 251.000 30.0 199.164 2.350 -999.990 -999.990 1.992 ..P WKT 2010 05 14 02 09 55 31.3200 -97.3300 251.000 122.0 203.216 3.540 -999.990 -999.990 2.032 ..P WKT 2010 05 14 02 14 55 31.3200 -97.3300 251.000 457.0 194.895 3.200 -999.990 -999.990 1.949 ..P WKT 2010 05 14 02 19 55 31.3200 -97.3300 251.000 30.0 195.854 3.000 -999.990 -999.990 1.959 ..P WKT 2010 05 14 02 24 55 31.3200 -97.3300 251.000 122.0 200.465 2.920 -999.990 -999.990 2.005 ..P WKT 2010 05 14 02 29 55 31.3200 -97.3300 251.000 457.0 184.565 3.100 -999.990 -999.990 1.846 ..P WKT 2010 05 14 02 39 55 31.3200 -97.3300 251.000 30.0 185.563 3.300 -999.990 -999.990 1.856 ..P WKT 2010 05 14 02 44 55 31.3200 -97.3300 251.000 122.0 179.143 4.040 -999.990 -999.990 1.791 ..P WKT 2010 05 14 02 49 55 31.3200 -97.3300 251.000 457.0 171.042 3.070 -999.990 -999.990 1.710 ..P WKT 2010 05 14 02 54 55 31.3200 -97.3300 251.000 30.0 170.241 3.040 -999.990 -999.990 1.702 ..P WKT 2010 05 14 02 59 55 31.3200 -97.3300 251.000 122.0 169.160 3.490 -999.990 -999.990 1.692 ..P WKT 2010 05 14 03 04 55 31.3200 -97.3300 251.000 457.0 167.518 6.000 -999.990 -999.990 1.675 ..P WKT 2010 05 14 03 14 55 31.3200 -97.3300 251.000 30.0 171.305 3.460 -999.990 -999.990 1.713 ..P WKT 2010 05 14 03 19 55 31.3200 -97.3300 251.000 122.0 172.807 3.570 -999.990 -999.990 1.728 ..P WKT 2010 05 14 03 24 55 31.3200 -97.3300 251.000 457.0 162.820 4.550 -999.990 -999.990 1.628 ..P WKT 2010 05 14 03 29 55 31.3200 -97.3300 251.000 30.0 165.443 4.260 -999.990 -999.990 1.654 ..P WKT 2010 05 14 03 34 55 31.3200 -97.3300 251.000 122.0 163.024 3.660 -999.990 -999.990 1.630 ..P WKT 2010 05 14 03 39 55 31.3200 -97.3300 251.000 457.0 168.447 5.350 -999.990 -999.990 1.684 ..P WKT 2010 05 14 03 49 55 31.3200 -97.3300 251.000 30.0 164.151 4.090 -999.990 -999.990 1.642 ..P WKT 2010 05 14 03 54 55 31.3200 -97.3300 251.000 122.0 159.195 3.800 -999.990 -999.990 1.592 ..P WKT 2010 05 14 03 59 55 31.3200 -97.3300 251.000 457.0 157.600 3.740 -999.990 -999.990 1.576 ..P WKT 2010 05 14 04 04 55 31.3200 -97.3300 251.000 30.0 151.390 3.510 -999.990 -999.990 1.514 ..P WKT 2010 05 14 04 09 55 31.3200 -97.3300 251.000 122.0 160.005 3.130 -999.990 -999.990 1.600 ..P WKT 2010 05 14 04 14 55 31.3200 -97.3300 251.000 457.0 153.797 3.140 -999.990 -999.990 1.538 ..P WKT 2010 05 14 04 24 55 31.3200 -97.3300 251.000 30.0 151.310 3.210 -999.990 -999.990 1.513 ..P WKT 2010 05 14 04 29 55 31.3200 -97.3300 251.000 122.0 163.829 3.770 -999.990 -999.990 1.638 ..P WKT 2010 05 14 04 34 55 31.3200 -97.3300 251.000 457.0 159.860 3.580 -999.990 -999.990 1.599 ..P WKT 2010 05 14 04 39 55 31.3200 -97.3300 251.000 30.0 157.569 4.290 -999.990 -999.990 1.576 ..P WKT 2010 05 14 04 44 55 31.3200 -97.3300 251.000 122.0 153.324 3.230 -999.990 -999.990 1.533 ..P WKT 2010 05 14 04 49 55 31.3200 -97.3300 251.000 457.0 156.061 2.540 -999.990 -999.990 1.561 ..P WKT 2010 05 14 05 04 55 31.3200 -97.3300 251.000 30.0 153.179 2.850 -999.990 -999.990 1.532 ..P WKT 2010 05 14 05 09 55 31.3200 -97.3300 251.000 122.0 159.924 4.440 -999.990 -999.990 1.599 ..P WKT 2010 05 14 05 14 55 31.3200 -97.3300 251.000 457.0 167.364 2.600 -999.990 -999.990 1.674 ..P WKT 2010 05 14 05 19 55 31.3200 -97.3300 251.000 30.0 144.971 3.970 -999.990 -999.990 1.450 ..P WKT 2010 05 14 05 24 55 31.3200 -97.3300 251.000 122.0 150.460 2.840 -999.990 -999.990 1.505 ..P WKT 2010 05 14 05 29 55 31.3200 -97.3300 251.000 457.0 159.707 3.840 -999.990 -999.990 1.597 ..P WKT 2010 05 14 05 39 55 31.3200 -97.3300 251.000 30.0 144.442 2.610 -999.990 -999.990 1.444 ..P WKT 2010 05 14 05 44 55 31.3200 -97.3300 251.000 122.0 151.828 2.560 -999.990 -999.990 1.518 ..P WKT 2010 05 14 05 49 55 31.3200 -97.3300 251.000 457.0 177.027 2.490 -999.990 -999.990 1.770 ..P WKT 2010 05 14 05 54 55 31.3200 -97.3300 251.000 30.0 141.539 2.320 -999.990 -999.990 1.415 ..P WKT 2010 05 14 05 59 55 31.3200 -97.3300 251.000 122.0 151.425 3.440 -999.990 -999.990 1.514 ..P WKT 2010 05 14 06 04 55 31.3200 -97.3300 251.000 457.0 166.870 2.090 -999.990 -999.990 1.669 ..P WKT 2010 05 14 06 14 55 31.3200 -97.3300 251.000 30.0 150.010 3.380 -999.990 -999.990 1.500 ..P WKT 2010 05 14 06 19 55 31.3200 -97.3300 251.000 122.0 154.980 2.230 -999.990 -999.990 1.550 ..P WKT 2010 05 14 06 24 55 31.3200 -97.3300 251.000 457.0 165.784 3.780 -999.990 -999.990 1.658 ..P WKT 2010 05 14 06 29 55 31.3200 -97.3300 251.000 30.0 144.349 3.590 -999.990 -999.990 1.443 ..P WKT 2010 05 14 06 34 55 31.3200 -97.3300 251.000 122.0 147.927 3.680 -999.990 -999.990 1.479 ..P WKT 2010 05 14 06 39 55 31.3200 -97.3300 251.000 457.0 165.670 2.900 -999.990 -999.990 1.657 ..P WKT 2010 05 14 06 49 55 31.3200 -97.3300 251.000 30.0 148.936 2.990 -999.990 -999.990 1.489 ..P WKT 2010 05 14 06 54 55 31.3200 -97.3300 251.000 122.0 160.282 4.120 -999.990 -999.990 1.603 ..P WKT 2010 05 14 06 59 55 31.3200 -97.3300 251.000 457.0 168.294 2.610 -999.990 -999.990 1.683 ..P WKT 2010 05 14 07 04 55 31.3200 -97.3300 251.000 30.0 146.337 2.320 -999.990 -999.990 1.463 ..P WKT 2010 05 14 07 09 55 31.3200 -97.3300 251.000 122.0 158.231 2.770 -999.990 -999.990 1.582 ..P WKT 2010 05 14 07 14 55 31.3200 -97.3300 251.000 457.0 174.002 2.770 -999.990 -999.990 1.740 ..P WKT 2010 05 14 07 24 55 31.3200 -97.3300 251.000 30.0 156.637 2.660 -999.990 -999.990 1.566 ..P WKT 2010 05 14 07 29 55 31.3200 -97.3300 251.000 122.0 157.888 2.350 -999.990 -999.990 1.579 ..P WKT 2010 05 14 07 34 55 31.3200 -97.3300 251.000 457.0 187.399 2.770 -999.990 -999.990 1.874 ..P WKT 2010 05 14 07 39 55 31.3200 -97.3300 251.000 30.0 158.588 2.460 -999.990 -999.990 1.586 ..P WKT 2010 05 14 07 44 55 31.3200 -97.3300 251.000 122.0 155.960 2.580 -999.990 -999.990 1.560 ..P WKT 2010 05 14 07 49 55 31.3200 -97.3300 251.000 457.0 177.146 2.800 -999.990 -999.990 1.771 ..P WKT 2010 05 14 07 59 55 31.3200 -97.3300 251.000 30.0 150.575 2.950 -999.990 -999.990 1.506 ..P WKT 2010 05 14 08 04 55 31.3200 -97.3300 251.000 122.0 154.730 2.630 -999.990 -999.990 1.547 ..P WKT 2010 05 14 08 09 55 31.3200 -97.3300 251.000 457.0 184.196 3.210 -999.990 -999.990 1.842 ..P WKT 2010 05 14 08 14 55 31.3200 -97.3300 251.000 30.0 144.091 3.000 -999.990 -999.990 1.441 ..P WKT 2010 05 14 08 19 55 31.3200 -97.3300 251.000 122.0 145.895 4.090 -999.990 -999.990 1.459 ..P WKT 2010 05 14 08 24 55 31.3200 -97.3300 251.000 457.0 157.789 3.660 -999.990 -999.990 1.578 ..P WKT 2010 05 14 08 34 55 31.3200 -97.3300 251.000 30.0 141.710 4.610 -999.990 -999.990 1.417 ..P WKT 2010 05 14 08 39 55 31.3200 -97.3300 251.000 122.0 144.559 3.560 -999.990 -999.990 1.446 ..P WKT 2010 05 14 08 44 55 31.3200 -97.3300 251.000 457.0 145.749 3.720 -999.990 -999.990 1.457 ..P WKT 2010 05 14 08 49 55 31.3200 -97.3300 251.000 30.0 145.972 3.340 -999.990 -999.990 1.460 ..P WKT 2010 05 14 08 54 55 31.3200 -97.3300 251.000 122.0 143.987 2.880 -999.990 -999.990 1.440 ..P WKT 2010 05 14 08 59 55 31.3200 -97.3300 251.000 457.0 154.836 4.070 -999.990 -999.990 1.548 ..P WKT 2010 05 14 09 09 55 31.3200 -97.3300 251.000 30.0 141.780 2.830 -999.990 -999.990 1.418 ..P WKT 2010 05 14 09 14 55 31.3200 -97.3300 251.000 122.0 142.575 2.610 -999.990 -999.990 1.426 ..P WKT 2010 05 14 09 19 55 31.3200 -97.3300 251.000 457.0 145.162 3.430 -999.990 -999.990 1.452 ..P WKT 2010 05 14 09 24 55 31.3200 -97.3300 251.000 30.0 140.580 4.860 -999.990 -999.990 1.406 ..P WKT 2010 05 14 09 29 55 31.3200 -97.3300 251.000 122.0 150.333 4.170 -999.990 -999.990 1.503 ..P WKT 2010 05 14 09 34 55 31.3200 -97.3300 251.000 457.0 147.681 2.950 -999.990 -999.990 1.477 ..P WKT 2010 05 14 09 44 55 31.3200 -97.3300 251.000 30.0 147.004 3.990 -999.990 -999.990 1.470 ..P WKT 2010 05 14 09 49 55 31.3200 -97.3300 251.000 122.0 139.614 4.340 -999.990 -999.990 1.396 ..P WKT 2010 05 14 09 54 55 31.3200 -97.3300 251.000 457.0 137.733 4.430 -999.990 -999.990 1.377 ..P WKT 2010 05 14 09 59 55 31.3200 -97.3300 251.000 30.0 135.578 4.960 -999.990 -999.990 1.356 ..P WKT 2010 05 14 10 04 55 31.3200 -97.3300 251.000 122.0 138.929 2.230 -999.990 -999.990 1.389 ..P WKT 2010 05 14 10 09 55 31.3200 -97.3300 251.000 457.0 125.219 2.210 -999.990 -999.990 1.252 ..P WKT 2010 05 14 10 19 55 31.3200 -97.3300 251.000 30.0 132.980 2.300 -999.990 -999.990 1.330 ..P WKT 2010 05 14 10 24 55 31.3200 -97.3300 251.000 122.0 131.889 2.520 -999.990 -999.990 1.319 ..P WKT 2010 05 14 10 29 55 31.3200 -97.3300 251.000 457.0 128.600 3.680 -999.990 -999.990 1.286 ..P WKT 2010 05 14 10 34 55 31.3200 -97.3300 251.000 30.0 134.656 3.870 -999.990 -999.990 1.347 ..P WKT 2010 05 14 10 39 55 31.3200 -97.3300 251.000 122.0 131.367 3.300 -999.990 -999.990 1.314 ..P WKT 2010 05 14 10 44 55 31.3200 -97.3300 251.000 457.0 130.003 3.050 -999.990 -999.990 1.300 ..P WKT 2010 05 14 10 54 55 31.3200 -97.3300 251.000 30.0 124.139 2.940 -999.990 -999.990 1.241 ..P WKT 2010 05 14 10 59 55 31.3200 -97.3300 251.000 122.0 132.542 2.970 -999.990 -999.990 1.325 ..P WKT 2010 05 14 11 04 55 31.3200 -97.3300 251.000 457.0 123.925 2.720 -999.990 -999.990 1.239 ..P WKT 2010 05 14 11 09 55 31.3200 -97.3300 251.000 30.0 129.032 2.480 -999.990 -999.990 1.290 ..P WKT 2010 05 14 11 14 55 31.3200 -97.3300 251.000 122.0 131.943 2.590 -999.990 -999.990 1.319 ..P WKT 2010 05 14 11 19 55 31.3200 -97.3300 251.000 457.0 126.623 3.510 -999.990 -999.990 1.266 ..P WKT 2010 05 14 11 29 55 31.3200 -97.3300 251.000 30.0 132.313 2.660 -999.990 -999.990 1.323 ..P WKT 2010 05 14 11 34 55 31.3200 -97.3300 251.000 122.0 130.159 3.060 -999.990 -999.990 1.302 ..P WKT 2010 05 14 11 39 55 31.3200 -97.3300 251.000 457.0 127.321 3.220 -999.990 -999.990 1.273 ..P WKT 2010 05 14 11 44 55 31.3200 -97.3300 251.000 30.0 132.976 3.180 -999.990 -999.990 1.330 ..P WKT 2010 05 14 11 49 55 31.3200 -97.3300 251.000 122.0 122.469 2.590 -999.990 -999.990 1.225 ..P WKT 2010 05 14 12 09 55 31.3200 -97.3300 251.000 457.0 127.624 2.960 -999.990 -999.990 1.276 ..P WKT 2010 05 14 12 10 25 31.3200 -97.3300 251.000 457.0 126.909 2.640 -999.990 -999.990 1.269 ..P WKT 2010 05 14 12 10 55 31.3200 -97.3300 251.000 457.0 127.289 2.890 -999.990 -999.990 1.273 ..P WKT 2010 05 14 12 11 25 31.3200 -97.3300 251.000 457.0 125.067 3.080 -999.990 -999.990 1.251 ..P WKT 2010 05 14 12 11 55 31.3200 -97.3300 251.000 457.0 125.310 3.060 -999.990 -999.990 1.253 ..P WKT 2010 05 14 12 12 25 31.3200 -97.3300 251.000 457.0 123.911 3.430 -999.990 -999.990 1.239 ..P WKT 2010 05 14 12 12 55 31.3200 -97.3300 251.000 457.0 131.823 3.520 -999.990 -999.990 1.318 ..P WKT 2010 05 14 12 13 25 31.3200 -97.3300 251.000 457.0 132.204 2.670 -999.990 -999.990 1.322 ..P WKT 2010 05 14 12 13 55 31.3200 -97.3300 251.000 457.0 128.887 2.810 -999.990 -999.990 1.289 ..P WKT 2010 05 14 12 14 25 31.3200 -97.3300 251.000 457.0 131.596 3.230 -999.990 -999.990 1.316 ..P WKT 2010 05 14 12 14 55 31.3200 -97.3300 251.000 457.0 139.098 4.300 -999.990 -999.990 1.391 ..P WKT 2010 05 14 12 19 55 31.3200 -97.3300 251.000 30.0 124.001 6.330 -999.990 -999.990 1.240 ..P WKT 2010 05 14 12 24 55 31.3200 -97.3300 251.000 122.0 133.425 3.020 -999.990 -999.990 1.334 ..P WKT 2010 05 14 12 29 55 31.3200 -97.3300 251.000 457.0 115.993 2.700 -999.990 -999.990 1.160 ..P WKT 2010 05 14 12 34 55 31.3200 -97.3300 251.000 30.0 123.087 2.800 -999.990 -999.990 1.231 ..P WKT 2010 05 14 12 39 55 31.3200 -97.3300 251.000 122.0 127.031 2.730 -999.990 -999.990 1.270 ..P WKT 2010 05 14 12 44 55 31.3200 -97.3300 251.000 457.0 111.510 2.490 -999.990 -999.990 1.115 ..P WKT 2010 05 14 12 54 55 31.3200 -97.3300 251.000 30.0 129.032 2.510 -999.990 -999.990 1.290 ..P WKT 2010 05 14 12 59 55 31.3200 -97.3300 251.000 122.0 122.591 2.510 -999.990 -999.990 1.226 ..P WKT 2010 05 14 13 04 55 31.3200 -97.3300 251.000 457.0 113.816 2.010 -999.990 -999.990 1.138 ..P WKT 2010 05 14 13 09 55 31.3200 -97.3300 251.000 30.0 120.130 2.200 -999.990 -999.990 1.201 ..P WKT 2010 05 14 13 14 55 31.3200 -97.3300 251.000 122.0 118.760 5.180 -999.990 -999.990 1.188 ..P WKT 2010 05 14 13 19 55 31.3200 -97.3300 251.000 457.0 114.647 2.240 -999.990 -999.990 1.146 ..P WKT 2010 05 14 13 29 55 31.3200 -97.3300 251.000 30.0 114.790 2.160 -999.990 -999.990 1.148 ..P WKT 2010 05 14 13 34 55 31.3200 -97.3300 251.000 122.0 117.538 2.630 -999.990 -999.990 1.175 ..P WKT 2010 05 14 13 39 55 31.3200 -97.3300 251.000 457.0 114.383 2.750 -999.990 -999.990 1.144 ..P WKT 2010 05 14 13 44 55 31.3200 -97.3300 251.000 30.0 120.429 2.400 -999.990 -999.990 1.204 ..P WKT 2010 05 14 13 49 55 31.3200 -97.3300 251.000 122.0 122.355 3.250 -999.990 -999.990 1.224 ..P WKT 2010 05 14 13 54 55 31.3200 -97.3300 251.000 457.0 109.995 1.750 -999.990 -999.990 1.100 ..P WKT 2010 05 14 14 04 55 31.3200 -97.3300 251.000 30.0 122.151 1.950 -999.990 -999.990 1.222 ..P WKT 2010 05 14 14 09 55 31.3200 -97.3300 251.000 122.0 124.687 4.070 -999.990 -999.990 1.247 ..P WKT 2010 05 14 14 14 55 31.3200 -97.3300 251.000 457.0 116.229 1.900 -999.990 -999.990 1.162 ..P WKT 2010 05 14 14 19 55 31.3200 -97.3300 251.000 30.0 121.239 2.140 -999.990 -999.990 1.212 ..P WKT 2010 05 14 14 24 55 31.3200 -97.3300 251.000 122.0 122.127 2.590 -999.990 -999.990 1.221 ..P WKT 2010 05 14 14 29 55 31.3200 -97.3300 251.000 457.0 119.715 3.010 -999.990 -999.990 1.197 ..P WKT 2010 05 14 14 39 55 31.3200 -97.3300 251.000 30.0 121.255 1.940 -999.990 -999.990 1.213 ..P WKT 2010 05 14 14 44 55 31.3200 -97.3300 251.000 122.0 121.907 2.060 -999.990 -999.990 1.219 ..P WKT 2010 05 14 14 49 55 31.3200 -97.3300 251.000 457.0 138.797 3.480 -999.990 -999.990 1.388 ..P WKT 2010 05 14 14 54 55 31.3200 -97.3300 251.000 30.0 124.588 2.480 -999.990 -999.990 1.246 ..P WKT 2010 05 14 14 59 55 31.3200 -97.3300 251.000 122.0 130.747 3.180 -999.990 -999.990 1.307 ..P WKT 2010 05 14 15 04 55 31.3200 -97.3300 251.000 457.0 123.692 2.360 -999.990 -999.990 1.237 ..P WKT 2010 05 14 15 14 55 31.3200 -97.3300 251.000 30.0 126.002 2.280 -999.990 -999.990 1.260 ..P WKT 2010 05 14 15 19 55 31.3200 -97.3300 251.000 122.0 129.588 3.230 -999.990 -999.990 1.296 ..P WKT 2010 05 14 15 24 55 31.3200 -97.3300 251.000 457.0 125.185 3.150 -999.990 -999.990 1.252 ..P WKT 2010 05 14 15 29 55 31.3200 -97.3300 251.000 30.0 127.668 3.690 -999.990 -999.990 1.277 ..P WKT 2010 05 14 15 34 55 31.3200 -97.3300 251.000 122.0 129.326 3.870 -999.990 -999.990 1.293 ..P WKT 2010 05 14 15 39 55 31.3200 -97.3300 251.000 457.0 123.544 3.260 -999.990 -999.990 1.235 ..P WKT 2010 05 14 15 49 55 31.3200 -97.3300 251.000 30.0 129.656 2.390 -999.990 -999.990 1.297 ..P WKT 2010 05 14 15 54 55 31.3200 -97.3300 251.000 122.0 136.181 2.720 -999.990 -999.990 1.362 ..P WKT 2010 05 14 15 59 55 31.3200 -97.3300 251.000 457.0 135.123 4.510 -999.990 -999.990 1.351 ..P WKT 2010 05 14 16 04 55 31.3200 -97.3300 251.000 30.0 124.549 3.940 -999.990 -999.990 1.245 ..P WKT 2010 05 14 16 09 55 31.3200 -97.3300 251.000 122.0 127.351 3.980 -999.990 -999.990 1.274 ..P WKT 2010 05 14 16 14 55 31.3200 -97.3300 251.000 457.0 126.292 3.430 -999.990 -999.990 1.263 ..P WKT 2010 05 14 16 24 55 31.3200 -97.3300 251.000 30.0 132.511 3.660 -999.990 -999.990 1.325 ..P WKT 2010 05 14 16 29 55 31.3200 -97.3300 251.000 122.0 141.724 3.750 -999.990 -999.990 1.417 ..P WKT 2010 05 14 16 34 55 31.3200 -97.3300 251.000 457.0 134.514 3.800 -999.990 -999.990 1.345 ..P WKT 2010 05 14 16 39 55 31.3200 -97.3300 251.000 30.0 135.171 3.740 -999.990 -999.990 1.352 ..P WKT 2010 05 14 16 44 55 31.3200 -97.3300 251.000 122.0 136.518 3.320 -999.990 -999.990 1.365 ..P WKT 2010 05 14 16 49 55 31.3200 -97.3300 251.000 457.0 131.927 3.240 -999.990 -999.990 1.319 ..P WKT 2010 05 14 17 04 55 31.3200 -97.3300 251.000 30.0 135.664 3.880 -999.990 -999.990 1.357 ..P WKT 2010 05 14 17 09 55 31.3200 -97.3300 251.000 122.0 141.626 3.460 -999.990 -999.990 1.416 ..P WKT 2010 05 14 17 14 55 31.3200 -97.3300 251.000 457.0 134.185 4.190 -999.990 -999.990 1.342 ..P WKT 2010 05 14 17 19 55 31.3200 -97.3300 251.000 30.0 137.246 3.460 -999.990 -999.990 1.372 ..P WKT 2010 05 14 17 24 55 31.3200 -97.3300 251.000 122.0 142.521 2.910 -999.990 -999.990 1.425 ..P WKT 2010 05 14 17 29 55 31.3200 -97.3300 251.000 457.0 132.035 2.840 -999.990 -999.990 1.320 ..P WKT 2010 05 14 17 39 55 31.3200 -97.3300 251.000 30.0 131.112 3.970 -999.990 -999.990 1.311 ..P WKT 2010 05 14 17 44 55 31.3200 -97.3300 251.000 122.0 133.350 4.470 -999.990 -999.990 1.333 ..P WKT 2010 05 14 17 49 55 31.3200 -97.3300 251.000 457.0 128.949 3.460 -999.990 -999.990 1.289 ..P WKT 2010 05 14 17 54 55 31.3200 -97.3300 251.000 30.0 132.571 3.440 -999.990 -999.990 1.326 ..P WKT 2010 05 14 17 59 55 31.3200 -97.3300 251.000 122.0 130.936 4.010 -999.990 -999.990 1.309 ..P WKT 2010 05 14 18 04 55 31.3200 -97.3300 251.000 457.0 131.792 3.470 -999.990 -999.990 1.318 ..P WKT 2010 05 14 18 14 55 31.3200 -97.3300 251.000 30.0 130.022 3.800 -999.990 -999.990 1.300 ..P WKT 2010 05 14 18 19 55 31.3200 -97.3300 251.000 122.0 133.489 4.780 -999.990 -999.990 1.335 ..P WKT 2010 05 14 18 24 55 31.3200 -97.3300 251.000 457.0 130.864 4.120 -999.990 -999.990 1.309 ..P WKT 2010 05 14 18 29 55 31.3200 -97.3300 251.000 30.0 134.054 5.080 -999.990 -999.990 1.341 ..P WKT 2010 05 14 18 34 55 31.3200 -97.3300 251.000 122.0 127.827 4.130 -999.990 -999.990 1.278 ..P WKT 2010 05 14 18 39 55 31.3200 -97.3300 251.000 457.0 125.753 4.280 -999.990 -999.990 1.258 ..P WKT 2010 05 14 18 49 55 31.3200 -97.3300 251.000 30.0 128.930 4.210 -999.990 -999.990 1.289 ..P WKT 2010 05 14 18 54 55 31.3200 -97.3300 251.000 122.0 127.252 4.710 -999.990 -999.990 1.273 ..P WKT 2010 05 14 18 59 55 31.3200 -97.3300 251.000 457.0 130.564 3.910 -999.990 -999.990 1.306 ..P WKT 2010 05 14 19 04 55 31.3200 -97.3300 251.000 30.0 130.550 3.840 -999.990 -999.990 1.306 ..P WKT 2010 05 14 19 09 55 31.3200 -97.3300 251.000 122.0 134.141 4.810 -999.990 -999.990 1.341 ..P WKT 2010 05 14 19 14 55 31.3200 -97.3300 251.000 457.0 135.513 3.610 -999.990 -999.990 1.355 ..P WKT 2010 05 14 19 24 55 31.3200 -97.3300 251.000 30.0 130.690 3.350 -999.990 -999.990 1.307 ..P WKT 2010 05 14 19 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 14 19 34 55 31.3200 -97.3300 251.000 457.0 133.832 4.380 -999.990 -999.990 1.338 ..P WKT 2010 05 14 19 39 55 31.3200 -97.3300 251.000 30.0 136.654 4.880 -999.990 -999.990 1.367 ..P WKT 2010 05 14 19 44 55 31.3200 -97.3300 251.000 122.0 130.731 4.100 -999.990 -999.990 1.307 ..P WKT 2010 05 14 19 49 55 31.3200 -97.3300 251.000 457.0 128.277 3.560 -999.990 -999.990 1.283 ..P WKT 2010 05 14 19 59 55 31.3200 -97.3300 251.000 30.0 130.548 3.780 -999.990 -999.990 1.305 ..P WKT 2010 05 14 20 04 55 31.3200 -97.3300 251.000 122.0 121.665 4.210 -999.990 -999.990 1.217 ..P WKT 2010 05 14 20 09 55 31.3200 -97.3300 251.000 457.0 136.532 4.570 -999.990 -999.990 1.365 ..P WKT 2010 05 14 20 14 55 31.3200 -97.3300 251.000 30.0 123.202 4.550 -999.990 -999.990 1.232 ..P WKT 2010 05 14 20 19 55 31.3200 -97.3300 251.000 122.0 138.350 4.510 -999.990 -999.990 1.383 ..P WKT 2010 05 14 20 24 55 31.3200 -97.3300 251.000 457.0 136.829 4.620 -999.990 -999.990 1.368 ..P WKT 2010 05 14 20 34 55 31.3200 -97.3300 251.000 30.0 132.075 4.720 -999.990 -999.990 1.321 ..P WKT 2010 05 14 20 39 55 31.3200 -97.3300 251.000 122.0 133.292 4.210 -999.990 -999.990 1.333 ..P WKT 2010 05 14 20 44 55 31.3200 -97.3300 251.000 457.0 130.477 5.130 -999.990 -999.990 1.305 ..P WKT 2010 05 14 20 49 55 31.3200 -97.3300 251.000 30.0 132.946 3.970 -999.990 -999.990 1.329 ..P WKT 2010 05 14 20 54 55 31.3200 -97.3300 251.000 122.0 128.600 4.150 -999.990 -999.990 1.286 ..P WKT 2010 05 14 20 59 55 31.3200 -97.3300 251.000 457.0 135.382 4.270 -999.990 -999.990 1.354 ..P WKT 2010 05 14 21 09 55 31.3200 -97.3300 251.000 30.0 133.466 3.760 -999.990 -999.990 1.335 ..P WKT 2010 05 14 21 14 55 31.3200 -97.3300 251.000 122.0 133.810 5.210 -999.990 -999.990 1.338 ..P WKT 2010 05 14 21 19 55 31.3200 -97.3300 251.000 457.0 134.293 4.150 -999.990 -999.990 1.343 ..P WKT 2010 05 14 21 24 55 31.3200 -97.3300 251.000 30.0 136.029 4.750 -999.990 -999.990 1.360 ..P WKT 2010 05 14 21 29 55 31.3200 -97.3300 251.000 122.0 143.056 4.230 -999.990 -999.990 1.431 ..P WKT 2010 05 14 21 34 55 31.3200 -97.3300 251.000 457.0 131.984 3.840 -999.990 -999.990 1.320 ..P WKT 2010 05 14 21 44 55 31.3200 -97.3300 251.000 30.0 139.157 3.920 -999.990 -999.990 1.392 ..P WKT 2010 05 14 21 49 55 31.3200 -97.3300 251.000 122.0 142.925 4.340 -999.990 -999.990 1.429 ..P WKT 2010 05 14 21 54 55 31.3200 -97.3300 251.000 457.0 128.861 6.950 -999.990 -999.990 1.289 ..P WKT 2010 05 14 21 59 55 31.3200 -97.3300 251.000 30.0 147.955 4.390 -999.990 -999.990 1.480 ..P WKT 2010 05 14 22 04 55 31.3200 -97.3300 251.000 122.0 133.053 4.030 -999.990 -999.990 1.331 ..P WKT 2010 05 14 22 09 55 31.3200 -97.3300 251.000 457.0 128.458 4.760 -999.990 -999.990 1.285 ..P WKT 2010 05 14 22 19 55 31.3200 -97.3300 251.000 30.0 133.846 4.330 -999.990 -999.990 1.338 ..P WKT 2010 05 14 22 24 55 31.3200 -97.3300 251.000 122.0 132.677 4.260 -999.990 -999.990 1.327 ..P WKT 2010 05 14 22 29 55 31.3200 -97.3300 251.000 457.0 125.092 5.200 -999.990 -999.990 1.251 ..P WKT 2010 05 14 22 34 55 31.3200 -97.3300 251.000 30.0 131.453 4.350 -999.990 -999.990 1.315 ..P WKT 2010 05 14 22 39 55 31.3200 -97.3300 251.000 122.0 139.768 4.340 -999.990 -999.990 1.398 ..P WKT 2010 05 14 22 44 55 31.3200 -97.3300 251.000 457.0 129.670 5.290 -999.990 -999.990 1.297 ..P WKT 2010 05 14 22 54 55 31.3200 -97.3300 251.000 30.0 144.872 4.440 -999.990 -999.990 1.449 ..P WKT 2010 05 14 22 59 55 31.3200 -97.3300 251.000 122.0 141.989 5.840 -999.990 -999.990 1.420 ..P WKT 2010 05 14 23 04 55 31.3200 -97.3300 251.000 457.0 134.358 5.090 -999.990 -999.990 1.344 ..P WKT 2010 05 14 23 09 55 31.3200 -97.3300 251.000 30.0 138.173 4.950 -999.990 -999.990 1.382 ..P WKT 2010 05 14 23 14 55 31.3200 -97.3300 251.000 122.0 141.431 5.090 -999.990 -999.990 1.414 ..P WKT 2010 05 14 23 19 55 31.3200 -97.3300 251.000 457.0 127.373 4.710 -999.990 -999.990 1.274 ..P WKT 2010 05 14 23 29 55 31.3200 -97.3300 251.000 30.0 128.870 5.100 -999.990 -999.990 1.289 ..P WKT 2010 05 14 23 34 55 31.3200 -97.3300 251.000 122.0 138.145 5.130 -999.990 -999.990 1.381 ..P WKT 2010 05 14 23 39 55 31.3200 -97.3300 251.000 457.0 130.098 4.780 -999.990 -999.990 1.301 ..P WKT 2010 05 14 23 44 55 31.3200 -97.3300 251.000 30.0 131.132 5.400 -999.990 -999.990 1.311 ..P WKT 2010 05 14 23 49 55 31.3200 -97.3300 251.000 122.0 128.532 5.050 -999.990 -999.990 1.285 ..P WKT 2010 05 15 00 09 55 31.3200 -97.3300 251.000 457.0 134.268 5.040 -999.990 -999.990 1.343 ..P WKT 2010 05 15 00 10 25 31.3200 -97.3300 251.000 457.0 137.794 4.970 -999.990 -999.990 1.378 ..P WKT 2010 05 15 00 10 55 31.3200 -97.3300 251.000 457.0 136.708 5.030 -999.990 -999.990 1.367 ..P WKT 2010 05 15 00 11 25 31.3200 -97.3300 251.000 457.0 129.750 5.390 -999.990 -999.990 1.298 ..P WKT 2010 05 15 00 11 55 31.3200 -97.3300 251.000 457.0 129.083 5.440 -999.990 -999.990 1.291 ..P WKT 2010 05 15 00 12 25 31.3200 -97.3300 251.000 457.0 129.115 5.550 -999.990 -999.990 1.291 ..P WKT 2010 05 15 00 12 55 31.3200 -97.3300 251.000 457.0 136.275 6.730 -999.990 -999.990 1.363 ..P WKT 2010 05 15 00 13 25 31.3200 -97.3300 251.000 457.0 130.995 5.620 -999.990 -999.990 1.310 ..P WKT 2010 05 15 00 13 55 31.3200 -97.3300 251.000 457.0 132.984 5.560 -999.990 -999.990 1.330 ..P WKT 2010 05 15 00 14 25 31.3200 -97.3300 251.000 457.0 128.403 4.870 -999.990 -999.990 1.284 ..P WKT 2010 05 15 00 14 55 31.3200 -97.3300 251.000 457.0 128.993 4.730 -999.990 -999.990 1.290 ..P WKT 2010 05 15 00 19 55 31.3200 -97.3300 251.000 30.0 131.406 4.990 -999.990 -999.990 1.314 ..P WKT 2010 05 15 00 24 55 31.3200 -97.3300 251.000 122.0 127.529 5.190 -999.990 -999.990 1.275 ..P WKT 2010 05 15 00 29 55 31.3200 -97.3300 251.000 457.0 124.632 4.760 -999.990 -999.990 1.246 ..P WKT 2010 05 15 00 34 55 31.3200 -97.3300 251.000 30.0 132.913 4.850 -999.990 -999.990 1.329 ..P WKT 2010 05 15 00 39 55 31.3200 -97.3300 251.000 122.0 136.304 4.720 -999.990 -999.990 1.363 ..P WKT 2010 05 15 00 44 55 31.3200 -97.3300 251.000 457.0 122.786 4.980 -999.990 -999.990 1.228 ..P WKT 2010 05 15 00 54 55 31.3200 -97.3300 251.000 30.0 125.679 4.930 -999.990 -999.990 1.257 ..P WKT 2010 05 15 00 59 55 31.3200 -97.3300 251.000 122.0 125.601 4.850 -999.990 -999.990 1.256 ..P WKT 2010 05 15 01 04 55 31.3200 -97.3300 251.000 457.0 127.898 5.460 -999.990 -999.990 1.279 ..P WKT 2010 05 15 01 09 55 31.3200 -97.3300 251.000 30.0 129.635 5.710 -999.990 -999.990 1.296 ..P WKT 2010 05 15 01 14 55 31.3200 -97.3300 251.000 122.0 125.925 5.400 -999.990 -999.990 1.259 ..P WKT 2010 05 15 01 19 55 31.3200 -97.3300 251.000 457.0 115.093 4.420 -999.990 -999.990 1.151 ..P WKT 2010 05 15 01 29 55 31.3200 -97.3300 251.000 30.0 132.712 4.420 -999.990 -999.990 1.327 ..P WKT 2010 05 15 01 34 55 31.3200 -97.3300 251.000 122.0 123.039 5.860 -999.990 -999.990 1.230 ..P WKT 2010 05 15 01 39 55 31.3200 -97.3300 251.000 457.0 110.853 4.810 -999.990 -999.990 1.109 ..P WKT 2010 05 15 01 44 55 31.3200 -97.3300 251.000 30.0 123.521 6.130 -999.990 -999.990 1.235 ..P WKT 2010 05 15 01 49 55 31.3200 -97.3300 251.000 122.0 126.694 4.360 -999.990 -999.990 1.267 ..P WKT 2010 05 15 01 54 55 31.3200 -97.3300 251.000 457.0 118.419 4.440 -999.990 -999.990 1.184 ..P WKT 2010 05 15 02 04 55 31.3200 -97.3300 251.000 30.0 126.320 5.290 -999.990 -999.990 1.263 ..P WKT 2010 05 15 02 09 55 31.3200 -97.3300 251.000 122.0 126.859 4.390 -999.990 -999.990 1.269 ..P WKT 2010 05 15 02 14 55 31.3200 -97.3300 251.000 457.0 121.258 4.830 -999.990 -999.990 1.213 ..P WKT 2010 05 15 02 19 55 31.3200 -97.3300 251.000 30.0 152.222 4.200 -999.990 -999.990 1.522 ..P WKT 2010 05 15 02 24 55 31.3200 -97.3300 251.000 122.0 125.967 4.030 -999.990 -999.990 1.260 ..P WKT 2010 05 15 02 29 55 31.3200 -97.3300 251.000 457.0 113.669 4.590 -999.990 -999.990 1.137 ..P WKT 2010 05 15 02 39 55 31.3200 -97.3300 251.000 30.0 136.914 4.170 -999.990 -999.990 1.369 ..P WKT 2010 05 15 02 44 55 31.3200 -97.3300 251.000 122.0 130.597 4.080 -999.990 -999.990 1.306 ..P WKT 2010 05 15 02 49 55 31.3200 -97.3300 251.000 457.0 118.143 3.730 -999.990 -999.990 1.181 ..P WKT 2010 05 15 02 54 55 31.3200 -97.3300 251.000 30.0 133.031 4.250 -999.990 -999.990 1.330 ..P WKT 2010 05 15 02 59 55 31.3200 -97.3300 251.000 122.0 129.506 4.010 -999.990 -999.990 1.295 ..P WKT 2010 05 15 03 04 55 31.3200 -97.3300 251.000 457.0 113.148 4.470 -999.990 -999.990 1.131 ..P WKT 2010 05 15 03 14 55 31.3200 -97.3300 251.000 30.0 137.877 3.820 -999.990 -999.990 1.379 ..P WKT 2010 05 15 03 19 55 31.3200 -97.3300 251.000 122.0 130.427 4.070 -999.990 -999.990 1.304 ..P WKT 2010 05 15 03 24 55 31.3200 -97.3300 251.000 457.0 115.448 3.970 -999.990 -999.990 1.154 ..P WKT 2010 05 15 03 29 55 31.3200 -97.3300 251.000 30.0 133.238 3.960 -999.990 -999.990 1.332 ..P WKT 2010 05 15 03 34 55 31.3200 -97.3300 251.000 122.0 128.718 3.680 -999.990 -999.990 1.287 ..P WKT 2010 05 15 03 39 55 31.3200 -97.3300 251.000 457.0 121.410 3.820 -999.990 -999.990 1.214 ..P WKT 2010 05 15 03 49 55 31.3200 -97.3300 251.000 30.0 142.980 3.630 -999.990 -999.990 1.430 ..P WKT 2010 05 15 03 54 55 31.3200 -97.3300 251.000 122.0 139.098 5.920 -999.990 -999.990 1.391 ..P WKT 2010 05 15 03 59 55 31.3200 -97.3300 251.000 457.0 119.466 3.940 -999.990 -999.990 1.195 ..P WKT 2010 05 15 04 04 55 31.3200 -97.3300 251.000 30.0 147.502 3.950 -999.990 -999.990 1.475 ..P WKT 2010 05 15 04 09 55 31.3200 -97.3300 251.000 122.0 141.948 5.500 -999.990 -999.990 1.419 ..P WKT 2010 05 15 04 14 55 31.3200 -97.3300 251.000 457.0 119.810 4.060 -999.990 -999.990 1.198 ..P WKT 2010 05 15 04 24 55 31.3200 -97.3300 251.000 30.0 143.780 4.030 -999.990 -999.990 1.438 ..P WKT 2010 05 15 04 29 55 31.3200 -97.3300 251.000 122.0 138.327 3.980 -999.990 -999.990 1.383 ..P WKT 2010 05 15 04 34 55 31.3200 -97.3300 251.000 457.0 127.998 3.940 -999.990 -999.990 1.280 ..P WKT 2010 05 15 04 39 55 31.3200 -97.3300 251.000 30.0 132.438 4.240 -999.990 -999.990 1.324 ..P WKT 2010 05 15 04 44 55 31.3200 -97.3300 251.000 122.0 126.847 4.400 -999.990 -999.990 1.268 ..P WKT 2010 05 15 04 49 55 31.3200 -97.3300 251.000 457.0 121.536 4.080 -999.990 -999.990 1.215 ..P WKT 2010 05 15 05 04 55 31.3200 -97.3300 251.000 30.0 126.610 3.680 -999.990 -999.990 1.266 ..P WKT 2010 05 15 05 09 55 31.3200 -97.3300 251.000 122.0 119.686 4.070 -999.990 -999.990 1.197 ..P WKT 2010 05 15 05 14 55 31.3200 -97.3300 251.000 457.0 119.447 5.160 -999.990 -999.990 1.194 ..P WKT 2010 05 15 05 19 55 31.3200 -97.3300 251.000 30.0 125.056 4.690 -999.990 -999.990 1.251 ..P WKT 2010 05 15 05 24 55 31.3200 -97.3300 251.000 122.0 129.689 3.880 -999.990 -999.990 1.297 ..P WKT 2010 05 15 05 29 55 31.3200 -97.3300 251.000 457.0 122.767 4.000 -999.990 -999.990 1.228 ..P WKT 2010 05 15 05 39 55 31.3200 -97.3300 251.000 30.0 130.504 4.240 -999.990 -999.990 1.305 ..P WKT 2010 05 15 05 44 55 31.3200 -97.3300 251.000 122.0 126.787 3.800 -999.990 -999.990 1.268 ..P WKT 2010 05 15 05 49 55 31.3200 -97.3300 251.000 457.0 128.638 4.190 -999.990 -999.990 1.286 ..P WKT 2010 05 15 05 54 55 31.3200 -97.3300 251.000 30.0 130.766 4.410 -999.990 -999.990 1.308 ..P WKT 2010 05 15 05 59 55 31.3200 -97.3300 251.000 122.0 131.503 4.510 -999.990 -999.990 1.315 ..P WKT 2010 05 15 06 04 55 31.3200 -97.3300 251.000 457.0 125.004 3.350 -999.990 -999.990 1.250 ..P WKT 2010 05 15 06 14 55 31.3200 -97.3300 251.000 30.0 126.757 3.190 -999.990 -999.990 1.268 ..P WKT 2010 05 15 06 19 55 31.3200 -97.3300 251.000 122.0 131.111 5.080 -999.990 -999.990 1.311 ..P WKT 2010 05 15 06 24 55 31.3200 -97.3300 251.000 457.0 123.500 5.180 -999.990 -999.990 1.235 ..P WKT 2010 05 15 06 29 55 31.3200 -97.3300 251.000 30.0 133.140 4.230 -999.990 -999.990 1.331 ..P WKT 2010 05 15 06 34 55 31.3200 -97.3300 251.000 122.0 136.937 4.640 -999.990 -999.990 1.369 ..P WKT 2010 05 15 06 39 55 31.3200 -97.3300 251.000 457.0 129.884 3.370 -999.990 -999.990 1.299 ..P WKT 2010 05 15 06 49 55 31.3200 -97.3300 251.000 30.0 136.702 3.360 -999.990 -999.990 1.367 ..P WKT 2010 05 15 06 54 55 31.3200 -97.3300 251.000 122.0 152.515 3.750 -999.990 -999.990 1.525 ..P WKT 2010 05 15 06 59 55 31.3200 -97.3300 251.000 457.0 129.393 4.240 -999.990 -999.990 1.294 ..P WKT 2010 05 15 07 04 55 31.3200 -97.3300 251.000 30.0 137.975 4.270 -999.990 -999.990 1.380 ..P WKT 2010 05 15 07 09 55 31.3200 -97.3300 251.000 122.0 151.006 4.180 -999.990 -999.990 1.510 ..P WKT 2010 05 15 07 14 55 31.3200 -97.3300 251.000 457.0 122.328 5.670 -999.990 -999.990 1.223 ..P WKT 2010 05 15 07 24 55 31.3200 -97.3300 251.000 30.0 142.368 5.310 -999.990 -999.990 1.424 ..P WKT 2010 05 15 07 29 55 31.3200 -97.3300 251.000 122.0 140.899 5.760 -999.990 -999.990 1.409 ..P WKT 2010 05 15 07 34 55 31.3200 -97.3300 251.000 457.0 120.945 4.290 -999.990 -999.990 1.209 ..P WKT 2010 05 15 07 39 55 31.3200 -97.3300 251.000 30.0 143.243 5.310 -999.990 -999.990 1.432 ..P WKT 2010 05 15 07 44 55 31.3200 -97.3300 251.000 122.0 143.164 5.000 -999.990 -999.990 1.432 ..P WKT 2010 05 15 07 49 55 31.3200 -97.3300 251.000 457.0 111.959 3.840 -999.990 -999.990 1.120 ..P WKT 2010 05 15 07 59 55 31.3200 -97.3300 251.000 30.0 138.402 3.960 -999.990 -999.990 1.384 ..P WKT 2010 05 15 08 04 55 31.3200 -97.3300 251.000 122.0 125.324 4.890 -999.990 -999.990 1.253 ..P WKT 2010 05 15 08 09 55 31.3200 -97.3300 251.000 457.0 112.109 3.550 -999.990 -999.990 1.121 ..P WKT 2010 05 15 08 14 55 31.3200 -97.3300 251.000 30.0 147.652 5.600 -999.990 -999.990 1.477 ..P WKT 2010 05 15 08 19 55 31.3200 -97.3300 251.000 122.0 133.048 3.810 -999.990 -999.990 1.330 ..P WKT 2010 05 15 08 24 55 31.3200 -97.3300 251.000 457.0 113.585 3.360 -999.990 -999.990 1.136 ..P WKT 2010 05 15 08 34 55 31.3200 -97.3300 251.000 30.0 149.061 3.290 -999.990 -999.990 1.491 ..P WKT 2010 05 15 08 39 55 31.3200 -97.3300 251.000 122.0 136.921 3.170 -999.990 -999.990 1.369 ..P WKT 2010 05 15 08 44 55 31.3200 -97.3300 251.000 457.0 121.450 4.130 -999.990 -999.990 1.215 ..P WKT 2010 05 15 08 49 55 31.3200 -97.3300 251.000 30.0 153.881 3.800 -999.990 -999.990 1.539 ..P WKT 2010 05 15 08 54 55 31.3200 -97.3300 251.000 122.0 144.659 4.480 -999.990 -999.990 1.447 ..P WKT 2010 05 15 08 59 55 31.3200 -97.3300 251.000 457.0 121.139 3.560 -999.990 -999.990 1.211 ..P WKT 2010 05 15 09 09 55 31.3200 -97.3300 251.000 30.0 151.421 3.760 -999.990 -999.990 1.514 ..P WKT 2010 05 15 09 14 55 31.3200 -97.3300 251.000 122.0 128.323 4.520 -999.990 -999.990 1.283 ..P WKT 2010 05 15 09 19 55 31.3200 -97.3300 251.000 457.0 113.831 3.130 -999.990 -999.990 1.138 ..P WKT 2010 05 15 09 24 55 31.3200 -97.3300 251.000 30.0 149.439 2.650 -999.990 -999.990 1.494 ..P WKT 2010 05 15 09 29 55 31.3200 -97.3300 251.000 122.0 129.259 2.950 -999.990 -999.990 1.293 ..P WKT 2010 05 15 09 34 55 31.3200 -97.3300 251.000 457.0 120.460 2.220 -999.990 -999.990 1.205 ..P WKT 2010 05 15 09 44 55 31.3200 -97.3300 251.000 30.0 146.525 2.170 -999.990 -999.990 1.465 ..P WKT 2010 05 15 09 49 55 31.3200 -97.3300 251.000 122.0 143.098 2.200 -999.990 -999.990 1.431 ..P WKT 2010 05 15 09 54 55 31.3200 -97.3300 251.000 457.0 119.140 3.890 -999.990 -999.990 1.191 ..P WKT 2010 05 15 09 59 55 31.3200 -97.3300 251.000 30.0 150.113 2.590 -999.990 -999.990 1.501 ..P WKT 2010 05 15 10 04 55 31.3200 -97.3300 251.000 122.0 132.817 2.350 -999.990 -999.990 1.328 ..P WKT 2010 05 15 10 09 55 31.3200 -97.3300 251.000 457.0 126.894 2.840 -999.990 -999.990 1.269 ..P WKT 2010 05 15 10 19 55 31.3200 -97.3300 251.000 30.0 150.312 2.560 -999.990 -999.990 1.503 ..P WKT 2010 05 15 10 24 55 31.3200 -97.3300 251.000 122.0 135.832 3.130 -999.990 -999.990 1.358 ..P WKT 2010 05 15 10 29 55 31.3200 -97.3300 251.000 457.0 136.051 3.150 -999.990 -999.990 1.361 ..P WKT 2010 05 15 10 34 55 31.3200 -97.3300 251.000 30.0 147.361 2.460 -999.990 -999.990 1.474 ..P WKT 2010 05 15 10 39 55 31.3200 -97.3300 251.000 122.0 125.953 3.100 -999.990 -999.990 1.260 ..P WKT 2010 05 15 10 44 55 31.3200 -97.3300 251.000 457.0 112.312 3.040 -999.990 -999.990 1.123 ..P WKT 2010 05 15 10 54 55 31.3200 -97.3300 251.000 30.0 143.739 2.400 -999.990 -999.990 1.437 ..P WKT 2010 05 15 10 59 55 31.3200 -97.3300 251.000 122.0 132.533 2.690 -999.990 -999.990 1.325 ..P WKT 2010 05 15 11 04 55 31.3200 -97.3300 251.000 457.0 127.150 2.630 -999.990 -999.990 1.272 ..P WKT 2010 05 15 11 09 55 31.3200 -97.3300 251.000 30.0 148.649 2.810 -999.990 -999.990 1.486 ..P WKT 2010 05 15 11 14 55 31.3200 -97.3300 251.000 122.0 126.916 2.740 -999.990 -999.990 1.269 ..P WKT 2010 05 15 11 19 55 31.3200 -97.3300 251.000 457.0 116.685 1.760 -999.990 -999.990 1.167 ..P WKT 2010 05 15 11 29 55 31.3200 -97.3300 251.000 30.0 139.291 3.080 -999.990 -999.990 1.393 ..P WKT 2010 05 15 11 34 55 31.3200 -97.3300 251.000 122.0 150.791 2.130 -999.990 -999.990 1.508 ..P WKT 2010 05 15 11 39 55 31.3200 -97.3300 251.000 457.0 124.894 2.750 -999.990 -999.990 1.249 ..P WKT 2010 05 15 11 44 55 31.3200 -97.3300 251.000 30.0 140.963 2.630 -999.990 -999.990 1.410 ..P WKT 2010 05 15 11 49 55 31.3200 -97.3300 251.000 122.0 142.352 4.020 -999.990 -999.990 1.424 ..P WKT 2010 05 15 12 09 55 31.3200 -97.3300 251.000 457.0 126.855 3.290 -999.990 -999.990 1.269 ..P WKT 2010 05 15 12 10 25 31.3200 -97.3300 251.000 457.0 124.614 2.710 -999.990 -999.990 1.246 ..P WKT 2010 05 15 12 10 55 31.3200 -97.3300 251.000 457.0 123.343 2.720 -999.990 -999.990 1.233 ..P WKT 2010 05 15 12 11 25 31.3200 -97.3300 251.000 457.0 122.903 2.030 -999.990 -999.990 1.229 ..P WKT 2010 05 15 12 11 55 31.3200 -97.3300 251.000 457.0 127.726 2.260 -999.990 -999.990 1.277 ..P WKT 2010 05 15 12 12 25 31.3200 -97.3300 251.000 457.0 130.057 2.170 -999.990 -999.990 1.301 ..P WKT 2010 05 15 12 12 55 31.3200 -97.3300 251.000 457.0 128.232 3.110 -999.990 -999.990 1.282 ..P WKT 2010 05 15 12 13 25 31.3200 -97.3300 251.000 457.0 132.086 2.720 -999.990 -999.990 1.321 ..P WKT 2010 05 15 12 13 55 31.3200 -97.3300 251.000 457.0 128.182 2.160 -999.990 -999.990 1.282 ..P WKT 2010 05 15 12 14 25 31.3200 -97.3300 251.000 457.0 124.002 3.440 -999.990 -999.990 1.240 ..P WKT 2010 05 15 12 14 55 31.3200 -97.3300 251.000 457.0 129.380 3.600 -999.990 -999.990 1.294 ..P WKT 2010 05 15 12 19 55 31.3200 -97.3300 251.000 30.0 139.527 2.360 -999.990 -999.990 1.395 ..P WKT 2010 05 15 12 24 55 31.3200 -97.3300 251.000 122.0 143.441 4.050 -999.990 -999.990 1.434 ..P WKT 2010 05 15 12 29 55 31.3200 -97.3300 251.000 457.0 127.949 2.880 -999.990 -999.990 1.279 ..P WKT 2010 05 15 12 34 55 31.3200 -97.3300 251.000 30.0 136.853 2.690 -999.990 -999.990 1.369 ..P WKT 2010 05 15 12 39 55 31.3200 -97.3300 251.000 122.0 139.105 2.670 -999.990 -999.990 1.391 ..P WKT 2010 05 15 12 44 55 31.3200 -97.3300 251.000 457.0 124.297 3.570 -999.990 -999.990 1.243 ..P WKT 2010 05 15 12 54 55 31.3200 -97.3300 251.000 30.0 140.893 3.120 -999.990 -999.990 1.409 ..P WKT 2010 05 15 12 59 55 31.3200 -97.3300 251.000 122.0 149.416 3.500 -999.990 -999.990 1.494 ..P WKT 2010 05 15 13 04 55 31.3200 -97.3300 251.000 457.0 121.855 2.670 -999.990 -999.990 1.219 ..P WKT 2010 05 15 13 09 55 31.3200 -97.3300 251.000 30.0 138.013 3.480 -999.990 -999.990 1.380 ..P WKT 2010 05 15 13 14 55 31.3200 -97.3300 251.000 122.0 148.761 2.650 -999.990 -999.990 1.488 ..P WKT 2010 05 15 13 19 55 31.3200 -97.3300 251.000 457.0 125.628 2.950 -999.990 -999.990 1.256 ..P WKT 2010 05 15 13 29 55 31.3200 -97.3300 251.000 30.0 150.209 4.080 -999.990 -999.990 1.502 ..P WKT 2010 05 15 13 34 55 31.3200 -97.3300 251.000 122.0 156.541 2.600 -999.990 -999.990 1.565 ..P WKT 2010 05 15 13 39 55 31.3200 -97.3300 251.000 457.0 125.074 3.480 -999.990 -999.990 1.251 ..P WKT 2010 05 15 13 44 55 31.3200 -97.3300 251.000 30.0 159.759 4.760 -999.990 -999.990 1.598 ..P WKT 2010 05 15 13 49 55 31.3200 -97.3300 251.000 122.0 157.755 3.650 -999.990 -999.990 1.578 ..P WKT 2010 05 15 13 54 55 31.3200 -97.3300 251.000 457.0 129.887 3.940 -999.990 -999.990 1.299 ..P WKT 2010 05 15 14 04 55 31.3200 -97.3300 251.000 30.0 157.978 2.800 -999.990 -999.990 1.580 ..P WKT 2010 05 15 14 09 55 31.3200 -97.3300 251.000 122.0 158.039 3.610 -999.990 -999.990 1.580 ..P WKT 2010 05 15 14 14 55 31.3200 -97.3300 251.000 457.0 133.609 3.970 -999.990 -999.990 1.336 ..P WKT 2010 05 15 14 19 55 31.3200 -97.3300 251.000 30.0 155.378 3.800 -999.990 -999.990 1.554 ..P WKT 2010 05 15 14 24 55 31.3200 -97.3300 251.000 122.0 158.500 3.210 -999.990 -999.990 1.585 ..P WKT 2010 05 15 14 29 55 31.3200 -97.3300 251.000 457.0 140.461 2.640 -999.990 -999.990 1.405 ..P WKT 2010 05 15 14 39 55 31.3200 -97.3300 251.000 30.0 161.529 4.910 -999.990 -999.990 1.615 ..P WKT 2010 05 15 14 44 55 31.3200 -97.3300 251.000 122.0 164.994 3.200 -999.990 -999.990 1.650 ..P WKT 2010 05 15 14 49 55 31.3200 -97.3300 251.000 457.0 123.873 3.960 -999.990 -999.990 1.239 ..P WKT 2010 05 15 14 54 55 31.3200 -97.3300 251.000 30.0 164.680 3.200 -999.990 -999.990 1.647 ..P WKT 2010 05 15 14 59 55 31.3200 -97.3300 251.000 122.0 159.227 2.930 -999.990 -999.990 1.592 ..P WKT 2010 05 15 15 04 55 31.3200 -97.3300 251.000 457.0 124.216 2.440 -999.990 -999.990 1.242 ..P WKT 2010 05 15 15 14 55 31.3200 -97.3300 251.000 30.0 159.849 2.600 -999.990 -999.990 1.598 ..P WKT 2010 05 15 15 19 55 31.3200 -97.3300 251.000 122.0 164.414 3.700 -999.990 -999.990 1.644 ..P WKT 2010 05 15 15 24 55 31.3200 -97.3300 251.000 457.0 133.545 4.590 -999.990 -999.990 1.335 ..P WKT 2010 05 15 15 29 55 31.3200 -97.3300 251.000 30.0 164.479 6.040 -999.990 -999.990 1.645 ..P WKT 2010 05 15 15 34 55 31.3200 -97.3300 251.000 122.0 167.233 5.250 -999.990 -999.990 1.672 ..P WKT 2010 05 15 15 39 55 31.3200 -97.3300 251.000 457.0 134.253 3.290 -999.990 -999.990 1.343 ..P WKT 2010 05 15 15 49 55 31.3200 -97.3300 251.000 30.0 168.220 4.320 -999.990 -999.990 1.682 ..P WKT 2010 05 15 15 54 55 31.3200 -97.3300 251.000 122.0 160.900 4.650 -999.990 -999.990 1.609 ..P WKT 2010 05 15 15 59 55 31.3200 -97.3300 251.000 457.0 137.793 5.820 -999.990 -999.990 1.378 ..P WKT 2010 05 15 16 04 55 31.3200 -97.3300 251.000 30.0 158.829 4.300 -999.990 -999.990 1.588 ..P WKT 2010 05 15 16 09 55 31.3200 -97.3300 251.000 122.0 153.460 3.760 -999.990 -999.990 1.535 ..P WKT 2010 05 15 16 14 55 31.3200 -97.3300 251.000 457.0 163.883 3.500 -999.990 -999.990 1.639 ..P WKT 2010 05 15 16 24 55 31.3200 -97.3300 251.000 30.0 161.251 3.350 -999.990 -999.990 1.613 ..P WKT 2010 05 15 16 29 55 31.3200 -97.3300 251.000 122.0 153.222 2.910 -999.990 -999.990 1.532 ..P WKT 2010 05 15 16 34 55 31.3200 -97.3300 251.000 457.0 145.609 3.350 -999.990 -999.990 1.456 ..P WKT 2010 05 15 16 39 55 31.3200 -97.3300 251.000 30.0 157.440 4.460 -999.990 -999.990 1.574 ..P WKT 2010 05 15 16 44 55 31.3200 -97.3300 251.000 122.0 151.644 4.310 -999.990 -999.990 1.516 ..P WKT 2010 05 15 16 49 55 31.3200 -97.3300 251.000 457.0 145.846 2.380 -999.990 -999.990 1.458 ..P WKT 2010 05 15 17 04 55 31.3200 -97.3300 251.000 30.0 155.276 3.140 -999.990 -999.990 1.553 ..P WKT 2010 05 15 17 09 55 31.3200 -97.3300 251.000 122.0 157.292 4.160 -999.990 -999.990 1.573 ..P WKT 2010 05 15 17 14 55 31.3200 -97.3300 251.000 457.0 147.403 3.530 -999.990 -999.990 1.474 ..P WKT 2010 05 15 17 19 55 31.3200 -97.3300 251.000 30.0 157.545 3.780 -999.990 -999.990 1.575 ..P WKT 2010 05 15 17 24 55 31.3200 -97.3300 251.000 122.0 160.404 4.260 -999.990 -999.990 1.604 ..P WKT 2010 05 15 17 29 55 31.3200 -97.3300 251.000 457.0 142.801 4.610 -999.990 -999.990 1.428 ..P WKT 2010 05 15 17 39 55 31.3200 -97.3300 251.000 30.0 157.335 5.050 -999.990 -999.990 1.573 ..P WKT 2010 05 15 17 44 55 31.3200 -97.3300 251.000 122.0 163.125 3.740 -999.990 -999.990 1.631 ..P WKT 2010 05 15 17 49 55 31.3200 -97.3300 251.000 457.0 149.563 3.860 -999.990 -999.990 1.496 ..P WKT 2010 05 15 17 54 55 31.3200 -97.3300 251.000 30.0 154.232 3.210 -999.990 -999.990 1.542 ..P WKT 2010 05 15 17 59 55 31.3200 -97.3300 251.000 122.0 156.658 3.270 -999.990 -999.990 1.567 ..P WKT 2010 05 15 18 04 55 31.3200 -97.3300 251.000 457.0 157.681 5.770 -999.990 -999.990 1.577 ..P WKT 2010 05 15 18 14 55 31.3200 -97.3300 251.000 30.0 155.157 2.360 -999.990 -999.990 1.552 ..P WKT 2010 05 15 18 19 55 31.3200 -97.3300 251.000 122.0 160.032 3.060 -999.990 -999.990 1.600 ..P WKT 2010 05 15 18 24 55 31.3200 -97.3300 251.000 457.0 153.955 4.710 -999.990 -999.990 1.540 ..P WKT 2010 05 15 18 29 55 31.3200 -97.3300 251.000 30.0 157.989 2.860 -999.990 -999.990 1.580 ..P WKT 2010 05 15 18 34 55 31.3200 -97.3300 251.000 122.0 162.586 3.140 -999.990 -999.990 1.626 ..P WKT 2010 05 15 18 39 55 31.3200 -97.3300 251.000 457.0 152.009 3.160 -999.990 -999.990 1.520 ..P WKT 2010 05 15 18 49 55 31.3200 -97.3300 251.000 30.0 157.091 3.020 -999.990 -999.990 1.571 ..P WKT 2010 05 15 18 54 55 31.3200 -97.3300 251.000 122.0 159.542 2.950 -999.990 -999.990 1.595 ..P WKT 2010 05 15 18 59 55 31.3200 -97.3300 251.000 457.0 154.401 3.290 -999.990 -999.990 1.544 ..P WKT 2010 05 15 19 04 55 31.3200 -97.3300 251.000 30.0 147.851 3.620 -999.990 -999.990 1.479 ..P WKT 2010 05 15 19 09 55 31.3200 -97.3300 251.000 122.0 151.991 4.270 -999.990 -999.990 1.520 ..P WKT 2010 05 15 19 14 55 31.3200 -97.3300 251.000 457.0 146.001 3.020 -999.990 -999.990 1.460 ..P WKT 2010 05 15 19 24 55 31.3200 -97.3300 251.000 30.0 146.381 3.000 -999.990 -999.990 1.464 ..P WKT 2010 05 15 19 29 55 31.3200 -97.3300 251.000 122.0 145.858 3.000 -999.990 -999.990 1.459 ..P WKT 2010 05 15 19 34 55 31.3200 -97.3300 251.000 457.0 143.785 3.140 -999.990 -999.990 1.438 ..P WKT 2010 05 15 19 39 55 31.3200 -97.3300 251.000 30.0 144.387 3.150 -999.990 -999.990 1.444 ..P WKT 2010 05 15 19 44 55 31.3200 -97.3300 251.000 122.0 151.469 2.830 -999.990 -999.990 1.515 ..P WKT 2010 05 15 19 49 55 31.3200 -97.3300 251.000 457.0 141.648 3.180 -999.990 -999.990 1.416 ..P WKT 2010 05 15 19 59 55 31.3200 -97.3300 251.000 30.0 141.444 4.920 -999.990 -999.990 1.414 ..P WKT 2010 05 15 20 04 55 31.3200 -97.3300 251.000 122.0 153.182 4.030 -999.990 -999.990 1.532 ..P WKT 2010 05 15 20 09 55 31.3200 -97.3300 251.000 457.0 148.570 4.430 -999.990 -999.990 1.486 ..P WKT 2010 05 15 20 14 55 31.3200 -97.3300 251.000 30.0 149.879 5.520 -999.990 -999.990 1.499 ..P WKT 2010 05 15 20 19 55 31.3200 -97.3300 251.000 122.0 154.009 5.190 -999.990 -999.990 1.540 ..P WKT 2010 05 15 20 24 55 31.3200 -97.3300 251.000 457.0 157.012 4.270 -999.990 -999.990 1.570 ..P WKT 2010 05 15 20 34 55 31.3200 -97.3300 251.000 30.0 154.131 4.500 -999.990 -999.990 1.541 ..P WKT 2010 05 15 20 39 55 31.3200 -97.3300 251.000 122.0 165.888 4.800 -999.990 -999.990 1.659 ..P WKT 2010 05 15 20 44 55 31.3200 -97.3300 251.000 457.0 161.978 5.560 -999.990 -999.990 1.620 ..P WKT 2010 05 15 20 49 55 31.3200 -97.3300 251.000 30.0 162.867 4.490 -999.990 -999.990 1.629 ..P WKT 2010 05 15 20 54 55 31.3200 -97.3300 251.000 122.0 157.120 3.390 -999.990 -999.990 1.571 ..P WKT 2010 05 15 20 59 55 31.3200 -97.3300 251.000 457.0 158.857 3.920 -999.990 -999.990 1.589 ..P WKT 2010 05 15 21 09 55 31.3200 -97.3300 251.000 30.0 159.566 3.290 -999.990 -999.990 1.596 ..P WKT 2010 05 15 21 14 55 31.3200 -97.3300 251.000 122.0 156.842 3.020 -999.990 -999.990 1.568 ..P WKT 2010 05 15 21 19 55 31.3200 -97.3300 251.000 457.0 159.206 4.580 -999.990 -999.990 1.592 ..P WKT 2010 05 15 21 24 55 31.3200 -97.3300 251.000 30.0 159.591 2.910 -999.990 -999.990 1.596 ..P WKT 2010 05 15 21 29 55 31.3200 -97.3300 251.000 122.0 165.633 3.270 -999.990 -999.990 1.656 ..P WKT 2010 05 15 21 34 55 31.3200 -97.3300 251.000 457.0 148.483 3.460 -999.990 -999.990 1.485 ..P WKT 2010 05 15 21 44 55 31.3200 -97.3300 251.000 30.0 156.769 2.880 -999.990 -999.990 1.568 ..P WKT 2010 05 15 21 49 55 31.3200 -97.3300 251.000 122.0 164.108 2.590 -999.990 -999.990 1.641 ..P WKT 2010 05 15 21 54 55 31.3200 -97.3300 251.000 457.0 163.241 3.720 -999.990 -999.990 1.632 ..P WKT 2010 05 15 21 59 55 31.3200 -97.3300 251.000 30.0 168.319 3.190 -999.990 -999.990 1.683 ..P WKT 2010 05 15 22 04 55 31.3200 -97.3300 251.000 122.0 165.470 3.600 -999.990 -999.990 1.655 ..P WKT 2010 05 15 22 09 55 31.3200 -97.3300 251.000 457.0 167.152 3.200 -999.990 -999.990 1.672 ..P WKT 2010 05 15 22 19 55 31.3200 -97.3300 251.000 30.0 174.282 2.600 -999.990 -999.990 1.743 ..P WKT 2010 05 15 22 24 55 31.3200 -97.3300 251.000 122.0 171.797 2.460 -999.990 -999.990 1.718 ..P WKT 2010 05 15 22 29 55 31.3200 -97.3300 251.000 457.0 172.428 3.690 -999.990 -999.990 1.724 ..P WKT 2010 05 15 22 34 55 31.3200 -97.3300 251.000 30.0 165.406 2.620 -999.990 -999.990 1.654 ..P WKT 2010 05 15 22 39 55 31.3200 -97.3300 251.000 122.0 171.707 2.410 -999.990 -999.990 1.717 ..P WKT 2010 05 15 22 44 55 31.3200 -97.3300 251.000 457.0 170.638 2.400 -999.990 -999.990 1.706 ..P WKT 2010 05 15 22 54 55 31.3200 -97.3300 251.000 30.0 170.604 3.380 -999.990 -999.990 1.706 ..P WKT 2010 05 15 22 59 55 31.3200 -97.3300 251.000 122.0 165.399 2.730 -999.990 -999.990 1.654 ..P WKT 2010 05 15 23 04 55 31.3200 -97.3300 251.000 457.0 170.551 3.070 -999.990 -999.990 1.706 ..P WKT 2010 05 15 23 09 55 31.3200 -97.3300 251.000 30.0 161.938 2.980 -999.990 -999.990 1.619 ..P WKT 2010 05 15 23 14 55 31.3200 -97.3300 251.000 122.0 164.961 2.620 -999.990 -999.990 1.650 ..P WKT 2010 05 15 23 19 55 31.3200 -97.3300 251.000 457.0 160.035 3.570 -999.990 -999.990 1.600 ..P WKT 2010 05 15 23 29 55 31.3200 -97.3300 251.000 30.0 154.098 3.010 -999.990 -999.990 1.541 ..P WKT 2010 05 15 23 34 55 31.3200 -97.3300 251.000 122.0 163.176 4.480 -999.990 -999.990 1.632 ..P WKT 2010 05 15 23 39 55 31.3200 -97.3300 251.000 457.0 155.064 2.620 -999.990 -999.990 1.551 ..P WKT 2010 05 15 23 44 55 31.3200 -97.3300 251.000 30.0 147.801 2.840 -999.990 -999.990 1.478 ..P WKT 2010 05 15 23 49 55 31.3200 -97.3300 251.000 122.0 151.197 3.460 -999.990 -999.990 1.512 ..P WKT 2010 05 16 00 09 55 31.3200 -97.3300 251.000 457.0 144.810 2.960 -999.990 -999.990 1.448 ..P WKT 2010 05 16 00 10 25 31.3200 -97.3300 251.000 457.0 144.551 3.050 -999.990 -999.990 1.446 ..P WKT 2010 05 16 00 10 55 31.3200 -97.3300 251.000 457.0 145.286 3.300 -999.990 -999.990 1.453 ..P WKT 2010 05 16 00 11 25 31.3200 -97.3300 251.000 457.0 138.630 3.470 -999.990 -999.990 1.386 ..P WKT 2010 05 16 00 11 55 31.3200 -97.3300 251.000 457.0 139.650 3.450 -999.990 -999.990 1.397 ..P WKT 2010 05 16 00 12 25 31.3200 -97.3300 251.000 457.0 144.934 3.070 -999.990 -999.990 1.449 ..P WKT 2010 05 16 00 12 55 31.3200 -97.3300 251.000 457.0 145.811 3.160 -999.990 -999.990 1.458 ..P WKT 2010 05 16 00 13 25 31.3200 -97.3300 251.000 457.0 143.277 3.290 -999.990 -999.990 1.433 ..P WKT 2010 05 16 00 13 55 31.3200 -97.3300 251.000 457.0 139.607 3.180 -999.990 -999.990 1.396 ..P WKT 2010 05 16 00 14 25 31.3200 -97.3300 251.000 457.0 142.048 3.130 -999.990 -999.990 1.420 ..P WKT 2010 05 16 00 14 55 31.3200 -97.3300 251.000 457.0 149.464 4.840 -999.990 -999.990 1.495 ..P WKT 2010 05 16 00 19 55 31.3200 -97.3300 251.000 30.0 145.731 3.060 -999.990 -999.990 1.457 ..P WKT 2010 05 16 00 24 55 31.3200 -97.3300 251.000 122.0 148.536 3.220 -999.990 -999.990 1.485 ..P WKT 2010 05 16 00 29 55 31.3200 -97.3300 251.000 457.0 140.400 3.750 -999.990 -999.990 1.404 ..P WKT 2010 05 16 00 34 55 31.3200 -97.3300 251.000 30.0 149.314 3.890 -999.990 -999.990 1.493 ..P WKT 2010 05 16 00 39 55 31.3200 -97.3300 251.000 122.0 140.327 4.360 -999.990 -999.990 1.403 ..P WKT 2010 05 16 00 44 55 31.3200 -97.3300 251.000 457.0 144.693 3.050 -999.990 -999.990 1.447 ..P WKT 2010 05 16 00 54 55 31.3200 -97.3300 251.000 30.0 149.422 3.580 -999.990 -999.990 1.494 ..P WKT 2010 05 16 00 59 55 31.3200 -97.3300 251.000 122.0 134.453 3.310 -999.990 -999.990 1.345 ..P WKT 2010 05 16 01 04 55 31.3200 -97.3300 251.000 457.0 142.484 2.830 -999.990 -999.990 1.425 ..P WKT 2010 05 16 01 09 55 31.3200 -97.3300 251.000 30.0 141.996 2.750 -999.990 -999.990 1.420 ..P WKT 2010 05 16 01 14 55 31.3200 -97.3300 251.000 122.0 142.928 2.670 -999.990 -999.990 1.429 ..P WKT 2010 05 16 01 19 55 31.3200 -97.3300 251.000 457.0 131.941 3.050 -999.990 -999.990 1.319 ..P WKT 2010 05 16 01 29 55 31.3200 -97.3300 251.000 30.0 151.660 2.340 -999.990 -999.990 1.517 ..P WKT 2010 05 16 01 34 55 31.3200 -97.3300 251.000 122.0 144.911 2.460 -999.990 -999.990 1.449 ..P WKT 2010 05 16 01 39 55 31.3200 -97.3300 251.000 457.0 140.433 2.490 -999.990 -999.990 1.404 ..P WKT 2010 05 16 01 44 55 31.3200 -97.3300 251.000 30.0 144.180 3.660 -999.990 -999.990 1.442 ..P WKT 2010 05 16 01 49 55 31.3200 -97.3300 251.000 122.0 145.941 3.220 -999.990 -999.990 1.459 ..P WKT 2010 05 16 01 54 55 31.3200 -97.3300 251.000 457.0 147.418 2.850 -999.990 -999.990 1.474 ..P WKT 2010 05 16 02 04 55 31.3200 -97.3300 251.000 30.0 148.387 3.790 -999.990 -999.990 1.484 ..P WKT 2010 05 16 02 09 55 31.3200 -97.3300 251.000 122.0 135.128 2.740 -999.990 -999.990 1.351 ..P WKT 2010 05 16 02 14 55 31.3200 -97.3300 251.000 457.0 141.706 3.630 -999.990 -999.990 1.417 ..P WKT 2010 05 16 02 19 55 31.3200 -97.3300 251.000 30.0 171.230 3.790 -999.990 -999.990 1.712 ..P WKT 2010 05 16 02 24 55 31.3200 -97.3300 251.000 122.0 138.993 2.670 -999.990 -999.990 1.390 ..P WKT 2010 05 16 02 29 55 31.3200 -97.3300 251.000 457.0 128.291 3.780 -999.990 -999.990 1.283 ..P WKT 2010 05 16 02 39 55 31.3200 -97.3300 251.000 30.0 144.514 4.380 -999.990 -999.990 1.445 ..P WKT 2010 05 16 02 44 55 31.3200 -97.3300 251.000 122.0 135.474 2.920 -999.990 -999.990 1.355 ..P WKT 2010 05 16 02 49 55 31.3200 -97.3300 251.000 457.0 122.756 2.710 -999.990 -999.990 1.228 ..P WKT 2010 05 16 02 54 55 31.3200 -97.3300 251.000 30.0 144.856 2.500 -999.990 -999.990 1.449 ..P WKT 2010 05 16 02 59 55 31.3200 -97.3300 251.000 122.0 138.508 2.630 -999.990 -999.990 1.385 ..P WKT 2010 05 16 03 04 55 31.3200 -97.3300 251.000 457.0 140.650 2.760 -999.990 -999.990 1.407 ..P WKT 2010 05 16 03 14 55 31.3200 -97.3300 251.000 30.0 135.982 4.290 -999.990 -999.990 1.360 ..P WKT 2010 05 16 03 19 55 31.3200 -97.3300 251.000 122.0 160.994 5.270 -999.990 -999.990 1.610 ..P WKT 2010 05 16 03 24 55 31.3200 -97.3300 251.000 457.0 141.457 3.010 -999.990 -999.990 1.415 ..P WKT 2010 05 16 03 29 55 31.3200 -97.3300 251.000 30.0 145.394 4.650 -999.990 -999.990 1.454 ..P WKT 2010 05 16 03 34 55 31.3200 -97.3300 251.000 122.0 136.891 2.860 -999.990 -999.990 1.369 ..P WKT 2010 05 16 03 39 55 31.3200 -97.3300 251.000 457.0 126.836 3.230 -999.990 -999.990 1.268 ..P WKT 2010 05 16 03 49 55 31.3200 -97.3300 251.000 30.0 148.257 3.340 -999.990 -999.990 1.483 ..P WKT 2010 05 16 03 54 55 31.3200 -97.3300 251.000 122.0 132.108 3.610 -999.990 -999.990 1.321 ..P WKT 2010 05 16 03 59 55 31.3200 -97.3300 251.000 457.0 128.820 3.950 -999.990 -999.990 1.288 ..P WKT 2010 05 16 04 04 55 31.3200 -97.3300 251.000 30.0 144.035 3.910 -999.990 -999.990 1.440 ..P WKT 2010 05 16 04 09 55 31.3200 -97.3300 251.000 122.0 136.509 3.730 -999.990 -999.990 1.365 ..P WKT 2010 05 16 04 14 55 31.3200 -97.3300 251.000 457.0 125.031 3.840 -999.990 -999.990 1.250 ..P WKT 2010 05 16 04 24 55 31.3200 -97.3300 251.000 30.0 143.044 4.370 -999.990 -999.990 1.430 ..P WKT 2010 05 16 04 29 55 31.3200 -97.3300 251.000 122.0 141.470 4.080 -999.990 -999.990 1.415 ..P WKT 2010 05 16 04 34 55 31.3200 -97.3300 251.000 457.0 123.243 3.230 -999.990 -999.990 1.232 ..P WKT 2010 05 16 04 39 55 31.3200 -97.3300 251.000 30.0 142.134 4.100 -999.990 -999.990 1.421 ..P WKT 2010 05 16 04 44 55 31.3200 -97.3300 251.000 122.0 135.623 3.330 -999.990 -999.990 1.356 ..P WKT 2010 05 16 04 49 55 31.3200 -97.3300 251.000 457.0 121.213 5.520 -999.990 -999.990 1.212 ..P WKT 2010 05 16 05 04 55 31.3200 -97.3300 251.000 30.0 135.684 3.010 -999.990 -999.990 1.357 ..P WKT 2010 05 16 05 09 55 31.3200 -97.3300 251.000 122.0 142.997 3.740 -999.990 -999.990 1.430 ..P WKT 2010 05 16 05 14 55 31.3200 -97.3300 251.000 457.0 118.446 3.620 -999.990 -999.990 1.184 ..P WKT 2010 05 16 05 19 55 31.3200 -97.3300 251.000 30.0 137.317 3.390 -999.990 -999.990 1.373 ..P WKT 2010 05 16 05 24 55 31.3200 -97.3300 251.000 122.0 140.116 3.180 -999.990 -999.990 1.401 ..P WKT 2010 05 16 05 29 55 31.3200 -97.3300 251.000 457.0 118.394 3.480 -999.990 -999.990 1.184 ..P WKT 2010 05 16 05 39 55 31.3200 -97.3300 251.000 30.0 138.485 2.650 -999.990 -999.990 1.385 ..P WKT 2010 05 16 05 44 55 31.3200 -97.3300 251.000 122.0 138.303 3.220 -999.990 -999.990 1.383 ..P WKT 2010 05 16 05 49 55 31.3200 -97.3300 251.000 457.0 136.151 3.010 -999.990 -999.990 1.362 ..P WKT 2010 05 16 05 54 55 31.3200 -97.3300 251.000 30.0 144.701 3.040 -999.990 -999.990 1.447 ..P WKT 2010 05 16 05 59 55 31.3200 -97.3300 251.000 122.0 147.053 3.270 -999.990 -999.990 1.471 ..P WKT 2010 05 16 06 04 55 31.3200 -97.3300 251.000 457.0 142.084 3.480 -999.990 -999.990 1.421 ..P WKT 2010 05 16 06 14 55 31.3200 -97.3300 251.000 30.0 145.180 3.770 -999.990 -999.990 1.452 ..P WKT 2010 05 16 06 19 55 31.3200 -97.3300 251.000 122.0 149.301 3.240 -999.990 -999.990 1.493 ..P WKT 2010 05 16 06 24 55 31.3200 -97.3300 251.000 457.0 152.012 3.270 -999.990 -999.990 1.520 ..P WKT 2010 05 16 06 29 55 31.3200 -97.3300 251.000 30.0 143.750 3.000 -999.990 -999.990 1.438 ..P WKT 2010 05 16 06 34 55 31.3200 -97.3300 251.000 122.0 136.896 3.910 -999.990 -999.990 1.369 ..P WKT 2010 05 16 06 39 55 31.3200 -97.3300 251.000 457.0 153.675 2.910 -999.990 -999.990 1.537 ..P WKT 2010 05 16 06 49 55 31.3200 -97.3300 251.000 30.0 146.278 2.730 -999.990 -999.990 1.463 ..P WKT 2010 05 16 06 54 55 31.3200 -97.3300 251.000 122.0 145.032 2.730 -999.990 -999.990 1.450 ..P WKT 2010 05 16 06 59 55 31.3200 -97.3300 251.000 457.0 136.757 3.870 -999.990 -999.990 1.368 ..P WKT 2010 05 16 07 04 55 31.3200 -97.3300 251.000 30.0 144.367 3.300 -999.990 -999.990 1.444 ..P WKT 2010 05 16 07 09 55 31.3200 -97.3300 251.000 122.0 140.029 3.260 -999.990 -999.990 1.400 ..P WKT 2010 05 16 07 14 55 31.3200 -97.3300 251.000 457.0 128.527 2.730 -999.990 -999.990 1.285 ..P WKT 2010 05 16 07 24 55 31.3200 -97.3300 251.000 30.0 143.440 3.240 -999.990 -999.990 1.434 ..P WKT 2010 05 16 07 29 55 31.3200 -97.3300 251.000 122.0 144.002 3.150 -999.990 -999.990 1.440 ..P WKT 2010 05 16 07 34 55 31.3200 -97.3300 251.000 457.0 133.467 2.420 -999.990 -999.990 1.335 ..P WKT 2010 05 16 07 39 55 31.3200 -97.3300 251.000 30.0 142.034 3.510 -999.990 -999.990 1.420 ..P WKT 2010 05 16 07 44 55 31.3200 -97.3300 251.000 122.0 142.736 2.840 -999.990 -999.990 1.427 ..P WKT 2010 05 16 07 49 55 31.3200 -97.3300 251.000 457.0 130.099 3.050 -999.990 -999.990 1.301 ..P WKT 2010 05 16 07 59 55 31.3200 -97.3300 251.000 30.0 150.653 3.260 -999.990 -999.990 1.507 ..P WKT 2010 05 16 08 04 55 31.3200 -97.3300 251.000 122.0 146.221 3.900 -999.990 -999.990 1.462 ..P WKT 2010 05 16 08 09 55 31.3200 -97.3300 251.000 457.0 127.478 2.780 -999.990 -999.990 1.275 ..P WKT 2010 05 16 08 14 55 31.3200 -97.3300 251.000 30.0 144.375 3.660 -999.990 -999.990 1.444 ..P WKT 2010 05 16 08 19 55 31.3200 -97.3300 251.000 122.0 149.764 4.210 -999.990 -999.990 1.498 ..P WKT 2010 05 16 08 24 55 31.3200 -97.3300 251.000 457.0 121.210 3.550 -999.990 -999.990 1.212 ..P WKT 2010 05 16 08 34 55 31.3200 -97.3300 251.000 30.0 143.349 3.740 -999.990 -999.990 1.433 ..P WKT 2010 05 16 08 39 55 31.3200 -97.3300 251.000 122.0 145.091 3.850 -999.990 -999.990 1.451 ..P WKT 2010 05 16 08 44 55 31.3200 -97.3300 251.000 457.0 134.217 3.910 -999.990 -999.990 1.342 ..P WKT 2010 05 16 08 49 55 31.3200 -97.3300 251.000 30.0 138.341 3.960 -999.990 -999.990 1.383 ..P WKT 2010 05 16 08 54 55 31.3200 -97.3300 251.000 122.0 144.708 3.760 -999.990 -999.990 1.447 ..P WKT 2010 05 16 08 59 55 31.3200 -97.3300 251.000 457.0 126.271 3.460 -999.990 -999.990 1.263 ..P WKT 2010 05 16 09 09 55 31.3200 -97.3300 251.000 30.0 132.318 3.850 -999.990 -999.990 1.323 ..P WKT 2010 05 16 09 14 55 31.3200 -97.3300 251.000 122.0 144.184 3.620 -999.990 -999.990 1.442 ..P WKT 2010 05 16 09 19 55 31.3200 -97.3300 251.000 457.0 119.074 3.990 -999.990 -999.990 1.191 ..P WKT 2010 05 16 09 24 55 31.3200 -97.3300 251.000 30.0 140.182 3.580 -999.990 -999.990 1.402 ..P WKT 2010 05 16 09 29 55 31.3200 -97.3300 251.000 122.0 141.961 6.000 -999.990 -999.990 1.420 ..P WKT 2010 05 16 09 34 55 31.3200 -97.3300 251.000 457.0 128.902 2.710 -999.990 -999.990 1.289 ..P WKT 2010 05 16 09 44 55 31.3200 -97.3300 251.000 30.0 149.377 4.930 -999.990 -999.990 1.494 ..P WKT 2010 05 16 09 49 55 31.3200 -97.3300 251.000 122.0 147.076 3.630 -999.990 -999.990 1.471 ..P WKT 2010 05 16 09 54 55 31.3200 -97.3300 251.000 457.0 119.871 3.250 -999.990 -999.990 1.199 ..P WKT 2010 05 16 09 59 55 31.3200 -97.3300 251.000 30.0 135.762 3.820 -999.990 -999.990 1.358 ..P WKT 2010 05 16 10 04 55 31.3200 -97.3300 251.000 122.0 147.172 3.630 -999.990 -999.990 1.472 ..P WKT 2010 05 16 10 09 55 31.3200 -97.3300 251.000 457.0 124.175 4.340 -999.990 -999.990 1.242 ..P WKT 2010 05 16 10 19 55 31.3200 -97.3300 251.000 30.0 148.827 4.530 -999.990 -999.990 1.488 ..P WKT 2010 05 16 10 24 55 31.3200 -97.3300 251.000 122.0 145.290 3.350 -999.990 -999.990 1.453 ..P WKT 2010 05 16 10 29 55 31.3200 -97.3300 251.000 457.0 125.820 3.080 -999.990 -999.990 1.258 ..P WKT 2010 05 16 10 34 55 31.3200 -97.3300 251.000 30.0 146.606 3.350 -999.990 -999.990 1.466 ..P WKT 2010 05 16 10 39 55 31.3200 -97.3300 251.000 122.0 145.866 3.340 -999.990 -999.990 1.459 ..P WKT 2010 05 16 10 44 55 31.3200 -97.3300 251.000 457.0 128.080 3.240 -999.990 -999.990 1.281 ..P WKT 2010 05 16 10 54 55 31.3200 -97.3300 251.000 30.0 141.513 4.390 -999.990 -999.990 1.415 ..P WKT 2010 05 16 10 59 55 31.3200 -97.3300 251.000 122.0 143.248 3.820 -999.990 -999.990 1.432 ..P WKT 2010 05 16 11 04 55 31.3200 -97.3300 251.000 457.0 130.320 3.300 -999.990 -999.990 1.303 ..P WKT 2010 05 16 11 09 55 31.3200 -97.3300 251.000 30.0 172.271 3.290 -999.990 -999.990 1.723 ..P WKT 2010 05 16 11 14 55 31.3200 -97.3300 251.000 122.0 147.894 3.690 -999.990 -999.990 1.479 ..P WKT 2010 05 16 11 19 55 31.3200 -97.3300 251.000 457.0 129.665 3.000 -999.990 -999.990 1.297 ..P WKT 2010 05 16 11 29 55 31.3200 -97.3300 251.000 30.0 156.223 3.430 -999.990 -999.990 1.562 ..P WKT 2010 05 16 11 34 55 31.3200 -97.3300 251.000 122.0 147.688 3.520 -999.990 -999.990 1.477 ..P WKT 2010 05 16 11 39 55 31.3200 -97.3300 251.000 457.0 127.856 3.090 -999.990 -999.990 1.279 ..P WKT 2010 05 16 11 44 55 31.3200 -97.3300 251.000 30.0 154.900 3.000 -999.990 -999.990 1.549 ..P WKT 2010 05 16 11 49 55 31.3200 -97.3300 251.000 122.0 144.138 3.040 -999.990 -999.990 1.441 ..P WKT 2010 05 16 12 09 55 31.3200 -97.3300 251.000 457.0 121.299 3.110 -999.990 -999.990 1.213 ..P WKT 2010 05 16 12 10 25 31.3200 -97.3300 251.000 457.0 122.855 3.190 -999.990 -999.990 1.229 ..P WKT 2010 05 16 12 10 55 31.3200 -97.3300 251.000 457.0 129.152 3.690 -999.990 -999.990 1.292 ..P WKT 2010 05 16 12 11 25 31.3200 -97.3300 251.000 457.0 123.736 4.050 -999.990 -999.990 1.237 ..P WKT 2010 05 16 12 11 55 31.3200 -97.3300 251.000 457.0 121.527 3.080 -999.990 -999.990 1.215 ..P WKT 2010 05 16 12 12 25 31.3200 -97.3300 251.000 457.0 120.852 2.900 -999.990 -999.990 1.209 ..P WKT 2010 05 16 12 12 55 31.3200 -97.3300 251.000 457.0 118.364 2.760 -999.990 -999.990 1.184 ..P WKT 2010 05 16 12 13 25 31.3200 -97.3300 251.000 457.0 120.060 2.500 -999.990 -999.990 1.201 ..P WKT 2010 05 16 12 13 55 31.3200 -97.3300 251.000 457.0 124.962 3.330 -999.990 -999.990 1.250 ..P WKT 2010 05 16 12 14 25 31.3200 -97.3300 251.000 457.0 124.009 2.680 -999.990 -999.990 1.240 ..P WKT 2010 05 16 12 14 55 31.3200 -97.3300 251.000 457.0 123.891 2.540 -999.990 -999.990 1.239 ..P WKT 2010 05 16 12 19 55 31.3200 -97.3300 251.000 30.0 141.543 2.920 -999.990 -999.990 1.415 ..P WKT 2010 05 16 12 24 55 31.3200 -97.3300 251.000 122.0 142.323 2.650 -999.990 -999.990 1.423 ..P WKT 2010 05 16 12 29 55 31.3200 -97.3300 251.000 457.0 122.885 2.540 -999.990 -999.990 1.229 ..P WKT 2010 05 16 12 34 55 31.3200 -97.3300 251.000 30.0 148.901 3.480 -999.990 -999.990 1.489 ..P WKT 2010 05 16 12 39 55 31.3200 -97.3300 251.000 122.0 147.172 2.820 -999.990 -999.990 1.472 ..P WKT 2010 05 16 12 44 55 31.3200 -97.3300 251.000 457.0 119.788 2.520 -999.990 -999.990 1.198 ..P WKT 2010 05 16 12 54 55 31.3200 -97.3300 251.000 30.0 152.425 3.060 -999.990 -999.990 1.524 ..P WKT 2010 05 16 12 59 55 31.3200 -97.3300 251.000 122.0 145.523 3.100 -999.990 -999.990 1.455 ..P WKT 2010 05 16 13 04 55 31.3200 -97.3300 251.000 457.0 123.287 2.880 -999.990 -999.990 1.233 ..P WKT 2010 05 16 13 09 55 31.3200 -97.3300 251.000 30.0 151.517 2.870 -999.990 -999.990 1.515 ..P WKT 2010 05 16 13 14 55 31.3200 -97.3300 251.000 122.0 152.701 4.320 -999.990 -999.990 1.527 ..P WKT 2010 05 16 13 19 55 31.3200 -97.3300 251.000 457.0 126.841 3.480 -999.990 -999.990 1.268 ..P WKT 2010 05 16 13 29 55 31.3200 -97.3300 251.000 30.0 158.644 4.530 -999.990 -999.990 1.586 ..P WKT 2010 05 16 13 34 55 31.3200 -97.3300 251.000 122.0 159.151 3.510 -999.990 -999.990 1.592 ..P WKT 2010 05 16 13 39 55 31.3200 -97.3300 251.000 457.0 128.991 3.800 -999.990 -999.990 1.290 ..P WKT 2010 05 16 13 44 55 31.3200 -97.3300 251.000 30.0 155.146 4.270 -999.990 -999.990 1.551 ..P WKT 2010 05 16 13 49 55 31.3200 -97.3300 251.000 122.0 157.605 4.080 -999.990 -999.990 1.576 ..P WKT 2010 05 16 13 54 55 31.3200 -97.3300 251.000 457.0 130.792 3.280 -999.990 -999.990 1.308 ..P WKT 2010 05 16 14 04 55 31.3200 -97.3300 251.000 30.0 155.064 4.070 -999.990 -999.990 1.551 ..P WKT 2010 05 16 14 09 55 31.3200 -97.3300 251.000 122.0 158.757 3.430 -999.990 -999.990 1.588 ..P WKT 2010 05 16 14 14 55 31.3200 -97.3300 251.000 457.0 122.588 3.670 -999.990 -999.990 1.226 ..P WKT 2010 05 16 14 19 55 31.3200 -97.3300 251.000 30.0 143.285 4.890 -999.990 -999.990 1.433 ..P WKT 2010 05 16 14 24 55 31.3200 -97.3300 251.000 122.0 155.619 3.890 -999.990 -999.990 1.556 ..P WKT 2010 05 16 14 29 55 31.3200 -97.3300 251.000 457.0 113.041 2.560 -999.990 -999.990 1.130 ..P WKT 2010 05 16 14 39 55 31.3200 -97.3300 251.000 30.0 147.862 2.830 -999.990 -999.990 1.479 ..P WKT 2010 05 16 14 44 55 31.3200 -97.3300 251.000 122.0 138.295 3.540 -999.990 -999.990 1.383 ..P WKT 2010 05 16 14 49 55 31.3200 -97.3300 251.000 457.0 143.083 4.130 -999.990 -999.990 1.431 ..P WKT 2010 05 16 14 54 55 31.3200 -97.3300 251.000 30.0 144.108 3.580 -999.990 -999.990 1.441 ..P WKT 2010 05 16 14 59 55 31.3200 -97.3300 251.000 122.0 149.731 3.210 -999.990 -999.990 1.497 ..P WKT 2010 05 16 15 04 55 31.3200 -97.3300 251.000 457.0 139.747 3.170 -999.990 -999.990 1.397 ..P WKT 2010 05 16 15 14 55 31.3200 -97.3300 251.000 30.0 147.191 3.130 -999.990 -999.990 1.472 ..P WKT 2010 05 16 15 19 55 31.3200 -97.3300 251.000 122.0 150.406 2.620 -999.990 -999.990 1.504 ..P WKT 2010 05 16 15 24 55 31.3200 -97.3300 251.000 457.0 147.489 3.240 -999.990 -999.990 1.475 ..P WKT 2010 05 16 15 29 55 31.3200 -97.3300 251.000 30.0 141.785 2.550 -999.990 -999.990 1.418 ..P WKT 2010 05 16 15 34 55 31.3200 -97.3300 251.000 122.0 144.582 4.030 -999.990 -999.990 1.446 ..P WKT 2010 05 16 15 39 55 31.3200 -97.3300 251.000 457.0 140.133 2.760 -999.990 -999.990 1.401 ..P WKT 2010 05 16 15 49 55 31.3200 -97.3300 251.000 30.0 137.305 2.880 -999.990 -999.990 1.373 ..P WKT 2010 05 16 15 54 55 31.3200 -97.3300 251.000 122.0 146.312 2.650 -999.990 -999.990 1.463 ..P WKT 2010 05 16 15 59 55 31.3200 -97.3300 251.000 457.0 140.827 3.980 -999.990 -999.990 1.408 ..P WKT 2010 05 16 16 04 55 31.3200 -97.3300 251.000 30.0 136.179 3.650 -999.990 -999.990 1.362 ..P WKT 2010 05 16 16 09 55 31.3200 -97.3300 251.000 122.0 138.220 3.770 -999.990 -999.990 1.382 ..P WKT 2010 05 16 16 14 55 31.3200 -97.3300 251.000 457.0 141.373 4.700 -999.990 -999.990 1.414 ..P WKT 2010 05 16 16 24 55 31.3200 -97.3300 251.000 30.0 139.084 3.680 -999.990 -999.990 1.391 ..P WKT 2010 05 16 16 29 55 31.3200 -97.3300 251.000 122.0 142.974 3.440 -999.990 -999.990 1.430 ..P WKT 2010 05 16 16 34 55 31.3200 -97.3300 251.000 457.0 124.715 3.350 -999.990 -999.990 1.247 ..P WKT 2010 05 16 16 39 55 31.3200 -97.3300 251.000 30.0 136.128 3.910 -999.990 -999.990 1.361 ..P WKT 2010 05 16 16 44 55 31.3200 -97.3300 251.000 122.0 147.400 4.600 -999.990 -999.990 1.474 ..P WKT 2010 05 16 16 49 55 31.3200 -97.3300 251.000 457.0 140.982 3.630 -999.990 -999.990 1.410 ..P WKT 2010 05 16 17 04 55 31.3200 -97.3300 251.000 30.0 130.852 5.320 -999.990 -999.990 1.309 ..P WKT 2010 05 16 17 09 55 31.3200 -97.3300 251.000 122.0 135.126 3.560 -999.990 -999.990 1.351 ..P WKT 2010 05 16 17 14 55 31.3200 -97.3300 251.000 457.0 132.991 3.520 -999.990 -999.990 1.330 ..P WKT 2010 05 16 17 19 55 31.3200 -97.3300 251.000 30.0 130.579 3.600 -999.990 -999.990 1.306 ..P WKT 2010 05 16 17 24 55 31.3200 -97.3300 251.000 122.0 135.965 3.470 -999.990 -999.990 1.360 ..P WKT 2010 05 16 17 29 55 31.3200 -97.3300 251.000 457.0 129.095 3.760 -999.990 -999.990 1.291 ..P WKT 2010 05 16 17 39 55 31.3200 -97.3300 251.000 30.0 133.676 3.540 -999.990 -999.990 1.337 ..P WKT 2010 05 16 17 44 55 31.3200 -97.3300 251.000 122.0 140.669 2.820 -999.990 -999.990 1.407 ..P WKT 2010 05 16 17 49 55 31.3200 -97.3300 251.000 457.0 135.964 4.970 -999.990 -999.990 1.360 ..P WKT 2010 05 16 17 54 55 31.3200 -97.3300 251.000 30.0 136.828 3.600 -999.990 -999.990 1.368 ..P WKT 2010 05 16 17 59 55 31.3200 -97.3300 251.000 122.0 137.972 3.410 -999.990 -999.990 1.380 ..P WKT 2010 05 16 18 04 55 31.3200 -97.3300 251.000 457.0 137.724 3.890 -999.990 -999.990 1.377 ..P WKT 2010 05 16 18 14 55 31.3200 -97.3300 251.000 30.0 132.828 4.150 -999.990 -999.990 1.328 ..P WKT 2010 05 16 18 19 55 31.3200 -97.3300 251.000 122.0 142.108 3.790 -999.990 -999.990 1.421 ..P WKT 2010 05 16 18 24 55 31.3200 -97.3300 251.000 457.0 135.235 4.330 -999.990 -999.990 1.352 ..P WKT 2010 05 16 18 29 55 31.3200 -97.3300 251.000 30.0 134.211 4.330 -999.990 -999.990 1.342 ..P WKT 2010 05 16 18 34 55 31.3200 -97.3300 251.000 122.0 139.869 3.890 -999.990 -999.990 1.399 ..P WKT 2010 05 16 18 39 55 31.3200 -97.3300 251.000 457.0 139.262 3.120 -999.990 -999.990 1.393 ..P WKT 2010 05 16 18 49 55 31.3200 -97.3300 251.000 30.0 139.520 3.290 -999.990 -999.990 1.395 ..P WKT 2010 05 16 18 54 55 31.3200 -97.3300 251.000 122.0 145.397 4.050 -999.990 -999.990 1.454 ..P WKT 2010 05 16 18 59 55 31.3200 -97.3300 251.000 457.0 147.376 4.780 -999.990 -999.990 1.474 ..P WKT 2010 05 16 19 04 55 31.3200 -97.3300 251.000 30.0 142.392 3.810 -999.990 -999.990 1.424 ..P WKT 2010 05 16 19 09 55 31.3200 -97.3300 251.000 122.0 145.902 4.540 -999.990 -999.990 1.459 ..P WKT 2010 05 16 19 14 55 31.3200 -97.3300 251.000 457.0 139.667 3.130 -999.990 -999.990 1.397 ..P WKT 2010 05 16 19 24 55 31.3200 -97.3300 251.000 30.0 138.672 4.190 -999.990 -999.990 1.387 ..P WKT 2010 05 16 19 29 55 31.3200 -97.3300 251.000 122.0 147.671 3.800 -999.990 -999.990 1.477 ..P WKT 2010 05 16 19 34 55 31.3200 -97.3300 251.000 457.0 141.495 3.540 -999.990 -999.990 1.415 ..P WKT 2010 05 16 19 39 55 31.3200 -97.3300 251.000 30.0 146.039 3.490 -999.990 -999.990 1.460 ..P WKT 2010 05 16 19 44 55 31.3200 -97.3300 251.000 122.0 150.583 3.320 -999.990 -999.990 1.506 ..P WKT 2010 05 16 19 49 55 31.3200 -97.3300 251.000 457.0 148.583 3.810 -999.990 -999.990 1.486 ..P WKT 2010 05 16 19 59 55 31.3200 -97.3300 251.000 30.0 146.514 3.130 -999.990 -999.990 1.465 ..P WKT 2010 05 16 20 04 55 31.3200 -97.3300 251.000 122.0 152.429 3.550 -999.990 -999.990 1.524 ..P WKT 2010 05 16 20 09 55 31.3200 -97.3300 251.000 457.0 141.642 3.620 -999.990 -999.990 1.416 ..P WKT 2010 05 16 20 14 55 31.3200 -97.3300 251.000 30.0 144.912 4.410 -999.990 -999.990 1.449 ..P WKT 2010 05 16 20 19 55 31.3200 -97.3300 251.000 122.0 145.399 3.610 -999.990 -999.990 1.454 ..P WKT 2010 05 16 20 24 55 31.3200 -97.3300 251.000 457.0 137.812 4.140 -999.990 -999.990 1.378 ..P WKT 2010 05 16 20 34 55 31.3200 -97.3300 251.000 30.0 143.300 4.370 -999.990 -999.990 1.433 ..P WKT 2010 05 16 20 39 55 31.3200 -97.3300 251.000 122.0 149.831 3.970 -999.990 -999.990 1.498 ..P WKT 2010 05 16 20 44 55 31.3200 -97.3300 251.000 457.0 146.062 4.350 -999.990 -999.990 1.461 ..P WKT 2010 05 16 20 49 55 31.3200 -97.3300 251.000 30.0 149.532 6.000 -999.990 -999.990 1.495 ..P WKT 2010 05 16 20 54 55 31.3200 -97.3300 251.000 122.0 150.217 4.150 -999.990 -999.990 1.502 ..P WKT 2010 05 16 20 59 55 31.3200 -97.3300 251.000 457.0 150.346 3.430 -999.990 -999.990 1.503 ..P WKT 2010 05 16 21 09 55 31.3200 -97.3300 251.000 30.0 150.980 3.560 -999.990 -999.990 1.510 ..P WKT 2010 05 16 21 14 55 31.3200 -97.3300 251.000 122.0 149.260 4.490 -999.990 -999.990 1.493 ..P WKT 2010 05 16 21 19 55 31.3200 -97.3300 251.000 457.0 149.488 5.090 -999.990 -999.990 1.495 ..P WKT 2010 05 16 21 24 55 31.3200 -97.3300 251.000 30.0 141.645 4.020 -999.990 -999.990 1.416 ..P WKT 2010 05 16 21 29 55 31.3200 -97.3300 251.000 122.0 146.047 4.250 -999.990 -999.990 1.460 ..P WKT 2010 05 16 21 34 55 31.3200 -97.3300 251.000 457.0 136.813 3.880 -999.990 -999.990 1.368 ..P WKT 2010 05 16 21 44 55 31.3200 -97.3300 251.000 30.0 135.878 3.420 -999.990 -999.990 1.359 ..P WKT 2010 05 16 21 49 55 31.3200 -97.3300 251.000 122.0 143.064 3.710 -999.990 -999.990 1.431 ..P WKT 2010 05 16 21 54 55 31.3200 -97.3300 251.000 457.0 139.396 4.330 -999.990 -999.990 1.394 ..P WKT 2010 05 16 21 59 55 31.3200 -97.3300 251.000 30.0 138.789 3.680 -999.990 -999.990 1.388 ..P WKT 2010 05 16 22 04 55 31.3200 -97.3300 251.000 122.0 146.253 4.090 -999.990 -999.990 1.463 ..P WKT 2010 05 16 22 09 55 31.3200 -97.3300 251.000 457.0 142.306 3.600 -999.990 -999.990 1.423 ..P WKT 2010 05 16 22 19 55 31.3200 -97.3300 251.000 30.0 144.870 3.870 -999.990 -999.990 1.449 ..P WKT 2010 05 16 22 24 55 31.3200 -97.3300 251.000 122.0 148.596 3.780 -999.990 -999.990 1.486 ..P WKT 2010 05 16 22 29 55 31.3200 -97.3300 251.000 457.0 141.192 5.220 -999.990 -999.990 1.412 ..P WKT 2010 05 16 22 34 55 31.3200 -97.3300 251.000 30.0 147.700 3.600 -999.990 -999.990 1.477 ..P WKT 2010 05 16 22 39 55 31.3200 -97.3300 251.000 122.0 149.479 3.520 -999.990 -999.990 1.495 ..P WKT 2010 05 16 22 44 55 31.3200 -97.3300 251.000 457.0 145.970 3.290 -999.990 -999.990 1.460 ..P WKT 2010 05 16 22 54 55 31.3200 -97.3300 251.000 30.0 147.082 4.420 -999.990 -999.990 1.471 ..P WKT 2010 05 16 22 59 55 31.3200 -97.3300 251.000 122.0 148.085 4.280 -999.990 -999.990 1.481 ..P WKT 2010 05 16 23 04 55 31.3200 -97.3300 251.000 457.0 138.933 6.140 -999.990 -999.990 1.389 ..P WKT 2010 05 16 23 09 55 31.3200 -97.3300 251.000 30.0 151.760 4.680 -999.990 -999.990 1.518 ..P WKT 2010 05 16 23 14 55 31.3200 -97.3300 251.000 122.0 154.432 5.170 -999.990 -999.990 1.544 ..P WKT 2010 05 16 23 19 55 31.3200 -97.3300 251.000 457.0 154.322 5.970 -999.990 -999.990 1.543 ..P WKT 2010 05 16 23 29 55 31.3200 -97.3300 251.000 30.0 154.358 6.000 -999.990 -999.990 1.544 ..P WKT 2010 05 16 23 34 55 31.3200 -97.3300 251.000 122.0 157.564 5.880 -999.990 -999.990 1.576 ..P WKT 2010 05 16 23 39 55 31.3200 -97.3300 251.000 457.0 149.921 5.310 -999.990 -999.990 1.499 ..P WKT 2010 05 16 23 44 55 31.3200 -97.3300 251.000 30.0 152.570 5.370 -999.990 -999.990 1.526 ..P WKT 2010 05 16 23 49 55 31.3200 -97.3300 251.000 122.0 149.934 4.920 -999.990 -999.990 1.499 ..P WKT 2010 05 17 00 09 55 31.3200 -97.3300 251.000 457.0 148.148 4.640 -999.990 -999.990 1.481 ..P WKT 2010 05 17 00 10 25 31.3200 -97.3300 251.000 457.0 150.521 4.450 -999.990 -999.990 1.505 ..P WKT 2010 05 17 00 10 55 31.3200 -97.3300 251.000 457.0 146.776 4.250 -999.990 -999.990 1.468 ..P WKT 2010 05 17 00 11 25 31.3200 -97.3300 251.000 457.0 143.726 4.370 -999.990 -999.990 1.437 ..P WKT 2010 05 17 00 11 55 31.3200 -97.3300 251.000 457.0 144.570 4.260 -999.990 -999.990 1.446 ..P WKT 2010 05 17 00 12 25 31.3200 -97.3300 251.000 457.0 146.526 4.190 -999.990 -999.990 1.465 ..P WKT 2010 05 17 00 12 55 31.3200 -97.3300 251.000 457.0 147.788 4.210 -999.990 -999.990 1.478 ..P WKT 2010 05 17 00 13 25 31.3200 -97.3300 251.000 457.0 146.406 5.270 -999.990 -999.990 1.464 ..P WKT 2010 05 17 00 13 55 31.3200 -97.3300 251.000 457.0 144.190 5.490 -999.990 -999.990 1.442 ..P WKT 2010 05 17 00 14 25 31.3200 -97.3300 251.000 457.0 150.320 4.280 -999.990 -999.990 1.503 ..P WKT 2010 05 17 00 14 55 31.3200 -97.3300 251.000 457.0 144.348 4.540 -999.990 -999.990 1.443 ..P WKT 2010 05 17 00 19 55 31.3200 -97.3300 251.000 30.0 147.921 4.370 -999.990 -999.990 1.479 ..P WKT 2010 05 17 00 24 55 31.3200 -97.3300 251.000 122.0 144.538 4.470 -999.990 -999.990 1.445 ..P WKT 2010 05 17 00 29 55 31.3200 -97.3300 251.000 457.0 141.990 4.570 -999.990 -999.990 1.420 ..P WKT 2010 05 17 00 34 55 31.3200 -97.3300 251.000 30.0 161.841 4.010 -999.990 -999.990 1.618 ..P WKT 2010 05 17 00 39 55 31.3200 -97.3300 251.000 122.0 155.398 5.170 -999.990 -999.990 1.554 ..P WKT 2010 05 17 00 44 55 31.3200 -97.3300 251.000 457.0 149.649 4.300 -999.990 -999.990 1.496 ..P WKT 2010 05 17 00 54 55 31.3200 -97.3300 251.000 30.0 149.563 4.560 -999.990 -999.990 1.496 ..P WKT 2010 05 17 00 59 55 31.3200 -97.3300 251.000 122.0 142.980 3.660 -999.990 -999.990 1.430 ..P WKT 2010 05 17 01 04 55 31.3200 -97.3300 251.000 457.0 141.407 4.020 -999.990 -999.990 1.414 ..P WKT 2010 05 17 01 09 55 31.3200 -97.3300 251.000 30.0 145.124 4.060 -999.990 -999.990 1.451 ..P WKT 2010 05 17 01 14 55 31.3200 -97.3300 251.000 122.0 141.601 3.850 -999.990 -999.990 1.416 ..P WKT 2010 05 17 01 19 55 31.3200 -97.3300 251.000 457.0 134.737 3.310 -999.990 -999.990 1.347 ..P WKT 2010 05 17 01 29 55 31.3200 -97.3300 251.000 30.0 140.699 3.550 -999.990 -999.990 1.407 ..P WKT 2010 05 17 01 34 55 31.3200 -97.3300 251.000 122.0 139.324 3.650 -999.990 -999.990 1.393 ..P WKT 2010 05 17 01 39 55 31.3200 -97.3300 251.000 457.0 141.012 4.560 -999.990 -999.990 1.410 ..P WKT 2010 05 17 01 44 55 31.3200 -97.3300 251.000 30.0 146.322 4.190 -999.990 -999.990 1.463 ..P WKT 2010 05 17 01 49 55 31.3200 -97.3300 251.000 122.0 160.268 3.240 -999.990 -999.990 1.603 ..P WKT 2010 05 17 01 54 55 31.3200 -97.3300 251.000 457.0 139.951 3.980 -999.990 -999.990 1.400 ..P WKT 2010 05 17 02 04 55 31.3200 -97.3300 251.000 30.0 139.209 3.600 -999.990 -999.990 1.392 ..P WKT 2010 05 17 02 09 55 31.3200 -97.3300 251.000 122.0 156.004 3.740 -999.990 -999.990 1.560 ..P WKT 2010 05 17 02 14 55 31.3200 -97.3300 251.000 457.0 140.200 3.190 -999.990 -999.990 1.402 ..P WKT 2010 05 17 02 19 55 31.3200 -97.3300 251.000 30.0 141.948 3.600 -999.990 -999.990 1.419 ..P WKT 2010 05 17 02 24 55 31.3200 -97.3300 251.000 122.0 142.583 3.370 -999.990 -999.990 1.426 ..P WKT 2010 05 17 02 29 55 31.3200 -97.3300 251.000 457.0 157.710 3.310 -999.990 -999.990 1.577 ..P WKT 2010 05 17 02 39 55 31.3200 -97.3300 251.000 30.0 446.021 25.120 -999.990 -999.990 4.460 ..P WKT 2010 05 17 02 44 55 31.3200 -97.3300 251.000 122.0 169.394 21.460 -999.990 -999.990 1.694 ..P WKT 2010 05 17 02 49 55 31.3200 -97.3300 251.000 457.0 144.184 3.590 -999.990 -999.990 1.442 ..P WKT 2010 05 17 02 54 55 31.3200 -97.3300 251.000 30.0 218.779 8.390 -999.990 -999.990 2.188 ..P WKT 2010 05 17 02 59 55 31.3200 -97.3300 251.000 122.0 146.729 3.670 -999.990 -999.990 1.467 ..P WKT 2010 05 17 03 04 55 31.3200 -97.3300 251.000 457.0 142.704 3.980 -999.990 -999.990 1.427 ..P WKT 2010 05 17 03 14 55 31.3200 -97.3300 251.000 30.0 167.618 3.830 -999.990 -999.990 1.676 ..P WKT 2010 05 17 03 19 55 31.3200 -97.3300 251.000 122.0 149.570 4.230 -999.990 -999.990 1.496 ..P WKT 2010 05 17 03 24 55 31.3200 -97.3300 251.000 457.0 144.627 4.780 -999.990 -999.990 1.446 ..P WKT 2010 05 17 03 29 55 31.3200 -97.3300 251.000 30.0 148.470 3.730 -999.990 -999.990 1.485 ..P WKT 2010 05 17 03 34 55 31.3200 -97.3300 251.000 122.0 143.248 4.810 -999.990 -999.990 1.432 ..P WKT 2010 05 17 03 39 55 31.3200 -97.3300 251.000 457.0 139.002 3.520 -999.990 -999.990 1.390 ..P WKT 2010 05 17 03 49 55 31.3200 -97.3300 251.000 30.0 196.092 4.220 -999.990 -999.990 1.961 ..P WKT 2010 05 17 03 54 55 31.3200 -97.3300 251.000 122.0 151.689 3.730 -999.990 -999.990 1.517 ..P WKT 2010 05 17 03 59 55 31.3200 -97.3300 251.000 457.0 144.113 4.170 -999.990 -999.990 1.441 ..P WKT 2010 05 17 04 04 55 31.3200 -97.3300 251.000 30.0 150.070 4.140 -999.990 -999.990 1.501 ..P WKT 2010 05 17 04 09 55 31.3200 -97.3300 251.000 122.0 144.726 4.160 -999.990 -999.990 1.447 ..P WKT 2010 05 17 04 14 55 31.3200 -97.3300 251.000 457.0 143.986 3.050 -999.990 -999.990 1.440 ..P WKT 2010 05 17 04 24 55 31.3200 -97.3300 251.000 30.0 143.782 3.550 -999.990 -999.990 1.438 ..P WKT 2010 05 17 04 29 55 31.3200 -97.3300 251.000 122.0 143.761 4.720 -999.990 -999.990 1.438 ..P WKT 2010 05 17 04 34 55 31.3200 -97.3300 251.000 457.0 145.135 4.400 -999.990 -999.990 1.451 ..P WKT 2010 05 17 04 39 55 31.3200 -97.3300 251.000 30.0 139.249 4.720 -999.990 -999.990 1.392 ..P WKT 2010 05 17 04 44 55 31.3200 -97.3300 251.000 122.0 137.551 3.630 -999.990 -999.990 1.376 ..P WKT 2010 05 17 04 49 55 31.3200 -97.3300 251.000 457.0 142.555 3.130 -999.990 -999.990 1.426 ..P WKT 2010 05 17 05 04 55 31.3200 -97.3300 251.000 30.0 146.478 5.440 -999.990 -999.990 1.465 ..P WKT 2010 05 17 05 09 55 31.3200 -97.3300 251.000 122.0 140.910 3.900 -999.990 -999.990 1.409 ..P WKT 2010 05 17 05 14 55 31.3200 -97.3300 251.000 457.0 135.899 4.390 -999.990 -999.990 1.359 ..P WKT 2010 05 17 05 19 55 31.3200 -97.3300 251.000 30.0 164.688 3.770 -999.990 -999.990 1.647 ..P WKT 2010 05 17 05 24 55 31.3200 -97.3300 251.000 122.0 146.550 3.250 -999.990 -999.990 1.466 ..P WKT 2010 05 17 05 29 55 31.3200 -97.3300 251.000 457.0 146.567 3.220 -999.990 -999.990 1.466 ..P WKT 2010 05 17 05 39 55 31.3200 -97.3300 251.000 30.0 166.401 3.840 -999.990 -999.990 1.664 ..P WKT 2010 05 17 05 44 55 31.3200 -97.3300 251.000 122.0 147.938 3.290 -999.990 -999.990 1.479 ..P WKT 2010 05 17 05 49 55 31.3200 -97.3300 251.000 457.0 145.680 3.420 -999.990 -999.990 1.457 ..P WKT 2010 05 17 05 54 55 31.3200 -97.3300 251.000 30.0 164.383 4.210 -999.990 -999.990 1.644 ..P WKT 2010 05 17 05 59 55 31.3200 -97.3300 251.000 122.0 144.239 3.680 -999.990 -999.990 1.442 ..P WKT 2010 05 17 06 04 55 31.3200 -97.3300 251.000 457.0 142.540 3.990 -999.990 -999.990 1.425 ..P WKT 2010 05 17 06 14 55 31.3200 -97.3300 251.000 30.0 163.581 4.030 -999.990 -999.990 1.636 ..P WKT 2010 05 17 06 19 55 31.3200 -97.3300 251.000 122.0 143.271 3.570 -999.990 -999.990 1.433 ..P WKT 2010 05 17 06 24 55 31.3200 -97.3300 251.000 457.0 144.208 4.220 -999.990 -999.990 1.442 ..P WKT 2010 05 17 06 29 55 31.3200 -97.3300 251.000 30.0 165.275 4.250 -999.990 -999.990 1.653 ..P WKT 2010 05 17 06 34 55 31.3200 -97.3300 251.000 122.0 249.119 4.460 -999.990 -999.990 2.491 ..P WKT 2010 05 17 06 39 55 31.3200 -97.3300 251.000 457.0 142.404 3.560 -999.990 -999.990 1.424 ..P WKT 2010 05 17 06 49 55 31.3200 -97.3300 251.000 30.0 157.021 3.060 -999.990 -999.990 1.570 ..P WKT 2010 05 17 06 54 55 31.3200 -97.3300 251.000 122.0 160.776 4.110 -999.990 -999.990 1.608 ..P WKT 2010 05 17 06 59 55 31.3200 -97.3300 251.000 457.0 142.294 3.780 -999.990 -999.990 1.423 ..P WKT 2010 05 17 07 04 55 31.3200 -97.3300 251.000 30.0 158.496 3.860 -999.990 -999.990 1.585 ..P WKT 2010 05 17 07 09 55 31.3200 -97.3300 251.000 122.0 145.047 4.220 -999.990 -999.990 1.450 ..P WKT 2010 05 17 07 14 55 31.3200 -97.3300 251.000 457.0 151.460 4.100 -999.990 -999.990 1.515 ..P WKT 2010 05 17 07 24 55 31.3200 -97.3300 251.000 30.0 155.433 4.190 -999.990 -999.990 1.554 ..P WKT 2010 05 17 07 29 55 31.3200 -97.3300 251.000 122.0 139.282 4.350 -999.990 -999.990 1.393 ..P WKT 2010 05 17 07 34 55 31.3200 -97.3300 251.000 457.0 152.792 3.810 -999.990 -999.990 1.528 ..P WKT 2010 05 17 07 39 55 31.3200 -97.3300 251.000 30.0 158.887 3.710 -999.990 -999.990 1.589 ..P WKT 2010 05 17 07 44 55 31.3200 -97.3300 251.000 122.0 139.514 3.950 -999.990 -999.990 1.395 ..P WKT 2010 05 17 07 49 55 31.3200 -97.3300 251.000 457.0 158.345 5.270 -999.990 -999.990 1.583 ..P WKT 2010 05 17 07 59 55 31.3200 -97.3300 251.000 30.0 163.041 4.820 -999.990 -999.990 1.630 ..P WKT 2010 05 17 08 04 55 31.3200 -97.3300 251.000 122.0 149.742 4.460 -999.990 -999.990 1.497 ..P WKT 2010 05 17 08 09 55 31.3200 -97.3300 251.000 457.0 147.920 3.120 -999.990 -999.990 1.479 ..P WKT 2010 05 17 08 14 55 31.3200 -97.3300 251.000 30.0 157.578 3.790 -999.990 -999.990 1.576 ..P WKT 2010 05 17 08 19 55 31.3200 -97.3300 251.000 122.0 154.217 3.300 -999.990 -999.990 1.542 ..P WKT 2010 05 17 08 24 55 31.3200 -97.3300 251.000 457.0 142.454 4.130 -999.990 -999.990 1.425 ..P WKT 2010 05 17 08 34 55 31.3200 -97.3300 251.000 30.0 162.354 3.640 -999.990 -999.990 1.624 ..P WKT 2010 05 17 08 39 55 31.3200 -97.3300 251.000 122.0 153.970 3.320 -999.990 -999.990 1.540 ..P WKT 2010 05 17 08 44 55 31.3200 -97.3300 251.000 457.0 143.625 3.800 -999.990 -999.990 1.436 ..P WKT 2010 05 17 08 49 55 31.3200 -97.3300 251.000 30.0 160.731 3.750 -999.990 -999.990 1.607 ..P WKT 2010 05 17 08 54 55 31.3200 -97.3300 251.000 122.0 147.582 3.360 -999.990 -999.990 1.476 ..P WKT 2010 05 17 08 59 55 31.3200 -97.3300 251.000 457.0 141.997 3.100 -999.990 -999.990 1.420 ..P WKT 2010 05 17 09 09 55 31.3200 -97.3300 251.000 30.0 154.682 3.940 -999.990 -999.990 1.547 ..P WKT 2010 05 17 09 14 55 31.3200 -97.3300 251.000 122.0 140.729 3.210 -999.990 -999.990 1.407 ..P WKT 2010 05 17 09 19 55 31.3200 -97.3300 251.000 457.0 151.716 5.070 -999.990 -999.990 1.517 ..P WKT 2010 05 17 09 24 55 31.3200 -97.3300 251.000 30.0 156.258 5.670 -999.990 -999.990 1.563 ..P WKT 2010 05 17 09 29 55 31.3200 -97.3300 251.000 122.0 156.877 4.130 -999.990 -999.990 1.569 ..P WKT 2010 05 17 09 34 55 31.3200 -97.3300 251.000 457.0 299.884 4.100 -999.990 -999.990 2.999 ..P WKT 2010 05 17 09 44 55 31.3200 -97.3300 251.000 30.0 163.100 3.350 -999.990 -999.990 1.631 ..P WKT 2010 05 17 09 49 55 31.3200 -97.3300 251.000 122.0 157.993 4.080 -999.990 -999.990 1.580 ..P WKT 2010 05 17 09 54 55 31.3200 -97.3300 251.000 457.0 231.948 5.230 -999.990 -999.990 2.319 ..P WKT 2010 05 17 09 59 55 31.3200 -97.3300 251.000 30.0 157.309 3.850 -999.990 -999.990 1.573 ..P WKT 2010 05 17 10 04 55 31.3200 -97.3300 251.000 122.0 154.444 3.190 -999.990 -999.990 1.544 ..P WKT 2010 05 17 10 09 55 31.3200 -97.3300 251.000 457.0 220.001 3.250 -999.990 -999.990 2.200 ..P WKT 2010 05 17 10 19 55 31.3200 -97.3300 251.000 30.0 145.344 2.380 -999.990 -999.990 1.453 ..P WKT 2010 05 17 10 24 55 31.3200 -97.3300 251.000 122.0 155.720 3.400 -999.990 -999.990 1.557 ..P WKT 2010 05 17 10 29 55 31.3200 -97.3300 251.000 457.0 204.104 3.340 -999.990 -999.990 2.041 ..P WKT 2010 05 17 10 34 55 31.3200 -97.3300 251.000 30.0 150.668 2.980 -999.990 -999.990 1.507 ..P WKT 2010 05 17 10 39 55 31.3200 -97.3300 251.000 122.0 150.385 3.450 -999.990 -999.990 1.504 ..P WKT 2010 05 17 10 44 55 31.3200 -97.3300 251.000 457.0 135.655 3.980 -999.990 -999.990 1.357 ..P WKT 2010 05 17 10 54 55 31.3200 -97.3300 251.000 30.0 145.009 2.920 -999.990 -999.990 1.450 ..P WKT 2010 05 17 10 59 55 31.3200 -97.3300 251.000 122.0 155.490 3.550 -999.990 -999.990 1.555 ..P WKT 2010 05 17 11 04 55 31.3200 -97.3300 251.000 457.0 140.574 2.930 -999.990 -999.990 1.406 ..P WKT 2010 05 17 11 09 55 31.3200 -97.3300 251.000 30.0 146.426 3.220 -999.990 -999.990 1.464 ..P WKT 2010 05 17 11 14 55 31.3200 -97.3300 251.000 122.0 151.435 3.800 -999.990 -999.990 1.514 ..P WKT 2010 05 17 11 19 55 31.3200 -97.3300 251.000 457.0 151.814 2.400 -999.990 -999.990 1.518 ..P WKT 2010 05 17 11 29 55 31.3200 -97.3300 251.000 30.0 150.299 2.820 -999.990 -999.990 1.503 ..P WKT 2010 05 17 11 34 55 31.3200 -97.3300 251.000 122.0 152.616 3.400 -999.990 -999.990 1.526 ..P WKT 2010 05 17 11 39 55 31.3200 -97.3300 251.000 457.0 147.914 2.940 -999.990 -999.990 1.479 ..P WKT 2010 05 17 11 44 55 31.3200 -97.3300 251.000 30.0 151.916 3.510 -999.990 -999.990 1.519 ..P WKT 2010 05 17 11 49 55 31.3200 -97.3300 251.000 122.0 151.285 3.470 -999.990 -999.990 1.513 ..P WKT 2010 05 17 12 09 55 31.3200 -97.3300 251.000 457.0 146.754 4.850 -999.990 -999.990 1.468 ..P WKT 2010 05 17 12 10 25 31.3200 -97.3300 251.000 457.0 150.468 3.680 -999.990 -999.990 1.505 ..P WKT 2010 05 17 12 10 55 31.3200 -97.3300 251.000 457.0 147.303 4.170 -999.990 -999.990 1.473 ..P WKT 2010 05 17 12 11 25 31.3200 -97.3300 251.000 457.0 152.000 3.280 -999.990 -999.990 1.520 ..P WKT 2010 05 17 12 11 55 31.3200 -97.3300 251.000 457.0 149.116 3.360 -999.990 -999.990 1.491 ..P WKT 2010 05 17 12 12 25 31.3200 -97.3300 251.000 457.0 146.231 3.340 -999.990 -999.990 1.462 ..P WKT 2010 05 17 12 12 55 31.3200 -97.3300 251.000 457.0 149.244 3.040 -999.990 -999.990 1.492 ..P WKT 2010 05 17 12 13 25 31.3200 -97.3300 251.000 457.0 143.271 4.250 -999.990 -999.990 1.433 ..P WKT 2010 05 17 12 13 55 31.3200 -97.3300 251.000 457.0 143.616 3.670 -999.990 -999.990 1.436 ..P WKT 2010 05 17 12 14 25 31.3200 -97.3300 251.000 457.0 146.629 3.700 -999.990 -999.990 1.466 ..P WKT 2010 05 17 12 14 55 31.3200 -97.3300 251.000 457.0 147.254 4.370 -999.990 -999.990 1.473 ..P WKT 2010 05 17 12 19 55 31.3200 -97.3300 251.000 30.0 164.038 3.440 -999.990 -999.990 1.640 ..P WKT 2010 05 17 12 24 55 31.3200 -97.3300 251.000 122.0 162.291 3.560 -999.990 -999.990 1.623 ..P WKT 2010 05 17 12 29 55 31.3200 -97.3300 251.000 457.0 141.314 3.330 -999.990 -999.990 1.413 ..P WKT 2010 05 17 12 34 55 31.3200 -97.3300 251.000 30.0 155.709 3.680 -999.990 -999.990 1.557 ..P WKT 2010 05 17 12 39 55 31.3200 -97.3300 251.000 122.0 146.525 4.400 -999.990 -999.990 1.465 ..P WKT 2010 05 17 12 44 55 31.3200 -97.3300 251.000 457.0 145.762 2.970 -999.990 -999.990 1.458 ..P WKT 2010 05 17 12 54 55 31.3200 -97.3300 251.000 30.0 165.309 3.390 -999.990 -999.990 1.653 ..P WKT 2010 05 17 12 59 55 31.3200 -97.3300 251.000 122.0 160.362 3.160 -999.990 -999.990 1.604 ..P WKT 2010 05 17 13 04 55 31.3200 -97.3300 251.000 457.0 148.963 3.940 -999.990 -999.990 1.490 ..P WKT 2010 05 17 13 09 55 31.3200 -97.3300 251.000 30.0 164.779 3.610 -999.990 -999.990 1.648 ..P WKT 2010 05 17 13 14 55 31.3200 -97.3300 251.000 122.0 160.676 5.210 -999.990 -999.990 1.607 ..P WKT 2010 05 17 13 19 55 31.3200 -97.3300 251.000 457.0 147.876 3.180 -999.990 -999.990 1.479 ..P WKT 2010 05 17 13 29 55 31.3200 -97.3300 251.000 30.0 157.663 3.240 -999.990 -999.990 1.577 ..P WKT 2010 05 17 13 34 55 31.3200 -97.3300 251.000 122.0 159.210 3.210 -999.990 -999.990 1.592 ..P WKT 2010 05 17 13 39 55 31.3200 -97.3300 251.000 457.0 141.125 4.050 -999.990 -999.990 1.411 ..P WKT 2010 05 17 13 44 55 31.3200 -97.3300 251.000 30.0 166.230 3.340 -999.990 -999.990 1.662 ..P WKT 2010 05 17 13 49 55 31.3200 -97.3300 251.000 122.0 161.607 3.600 -999.990 -999.990 1.616 ..P WKT 2010 05 17 13 54 55 31.3200 -97.3300 251.000 457.0 151.937 3.300 -999.990 -999.990 1.519 ..P WKT 2010 05 17 14 04 55 31.3200 -97.3300 251.000 30.0 158.335 3.060 -999.990 -999.990 1.583 ..P WKT 2010 05 17 14 09 55 31.3200 -97.3300 251.000 122.0 165.427 2.750 -999.990 -999.990 1.654 ..P WKT 2010 05 17 14 14 55 31.3200 -97.3300 251.000 457.0 154.018 2.980 -999.990 -999.990 1.540 ..P WKT 2010 05 17 14 19 55 31.3200 -97.3300 251.000 30.0 163.634 3.250 -999.990 -999.990 1.636 ..P WKT 2010 05 17 14 24 55 31.3200 -97.3300 251.000 122.0 150.545 3.540 -999.990 -999.990 1.505 ..P WKT 2010 05 17 14 29 55 31.3200 -97.3300 251.000 457.0 150.770 2.880 -999.990 -999.990 1.508 ..P WKT 2010 05 17 14 39 55 31.3200 -97.3300 251.000 30.0 160.847 2.640 -999.990 -999.990 1.608 ..P WKT 2010 05 17 14 44 55 31.3200 -97.3300 251.000 122.0 166.215 2.760 -999.990 -999.990 1.662 ..P WKT 2010 05 17 14 49 55 31.3200 -97.3300 251.000 457.0 147.488 3.110 -999.990 -999.990 1.475 ..P WKT 2010 05 17 14 54 55 31.3200 -97.3300 251.000 30.0 162.941 3.840 -999.990 -999.990 1.629 ..P WKT 2010 05 17 14 59 55 31.3200 -97.3300 251.000 122.0 162.985 3.460 -999.990 -999.990 1.630 ..P WKT 2010 05 17 15 04 55 31.3200 -97.3300 251.000 457.0 148.743 3.400 -999.990 -999.990 1.487 ..P WKT 2010 05 17 15 14 55 31.3200 -97.3300 251.000 30.0 154.195 3.590 -999.990 -999.990 1.542 ..P WKT 2010 05 17 15 19 55 31.3200 -97.3300 251.000 122.0 159.321 4.060 -999.990 -999.990 1.593 ..P WKT 2010 05 17 15 24 55 31.3200 -97.3300 251.000 457.0 149.183 3.740 -999.990 -999.990 1.492 ..P WKT 2010 05 17 15 29 55 31.3200 -97.3300 251.000 30.0 155.849 3.680 -999.990 -999.990 1.558 ..P WKT 2010 05 17 15 34 55 31.3200 -97.3300 251.000 122.0 155.933 3.870 -999.990 -999.990 1.559 ..P WKT 2010 05 17 15 39 55 31.3200 -97.3300 251.000 457.0 153.778 4.040 -999.990 -999.990 1.538 ..P WKT 2010 05 17 15 49 55 31.3200 -97.3300 251.000 30.0 159.806 4.410 -999.990 -999.990 1.598 ..P WKT 2010 05 17 15 54 55 31.3200 -97.3300 251.000 122.0 166.729 3.930 -999.990 -999.990 1.667 ..P WKT 2010 05 17 15 59 55 31.3200 -97.3300 251.000 457.0 148.179 3.460 -999.990 -999.990 1.482 ..P WKT 2010 05 17 16 04 55 31.3200 -97.3300 251.000 30.0 151.323 3.880 -999.990 -999.990 1.513 ..P WKT 2010 05 17 16 09 55 31.3200 -97.3300 251.000 122.0 157.265 3.440 -999.990 -999.990 1.573 ..P WKT 2010 05 17 16 14 55 31.3200 -97.3300 251.000 457.0 149.074 3.670 -999.990 -999.990 1.491 ..P WKT 2010 05 17 16 24 55 31.3200 -97.3300 251.000 30.0 153.801 3.460 -999.990 -999.990 1.538 ..P WKT 2010 05 17 16 29 55 31.3200 -97.3300 251.000 122.0 162.239 4.450 -999.990 -999.990 1.622 ..P WKT 2010 05 17 16 34 55 31.3200 -97.3300 251.000 457.0 156.408 3.620 -999.990 -999.990 1.564 ..P WKT 2010 05 17 16 39 55 31.3200 -97.3300 251.000 30.0 152.256 4.140 -999.990 -999.990 1.523 ..P WKT 2010 05 17 16 44 55 31.3200 -97.3300 251.000 122.0 158.175 3.940 -999.990 -999.990 1.582 ..P WKT 2010 05 17 16 49 55 31.3200 -97.3300 251.000 457.0 152.905 4.100 -999.990 -999.990 1.529 ..P WKT 2010 05 17 17 04 55 31.3200 -97.3300 251.000 30.0 148.025 4.550 -999.990 -999.990 1.480 ..P WKT 2010 05 17 17 09 55 31.3200 -97.3300 251.000 122.0 157.308 3.850 -999.990 -999.990 1.573 ..P WKT 2010 05 17 17 14 55 31.3200 -97.3300 251.000 457.0 149.814 5.780 -999.990 -999.990 1.498 ..P WKT 2010 05 17 17 19 55 31.3200 -97.3300 251.000 30.0 152.105 4.700 -999.990 -999.990 1.521 ..P WKT 2010 05 17 17 24 55 31.3200 -97.3300 251.000 122.0 160.267 4.560 -999.990 -999.990 1.603 ..P WKT 2010 05 17 17 29 55 31.3200 -97.3300 251.000 457.0 155.290 3.270 -999.990 -999.990 1.553 ..P WKT 2010 05 17 17 39 55 31.3200 -97.3300 251.000 30.0 153.093 3.810 -999.990 -999.990 1.531 ..P WKT 2010 05 17 17 44 55 31.3200 -97.3300 251.000 122.0 172.642 4.450 -999.990 -999.990 1.726 ..P WKT 2010 05 17 17 49 55 31.3200 -97.3300 251.000 457.0 150.547 4.870 -999.990 -999.990 1.505 ..P WKT 2010 05 17 17 54 55 31.3200 -97.3300 251.000 30.0 157.518 4.410 -999.990 -999.990 1.575 ..P WKT 2010 05 17 17 59 55 31.3200 -97.3300 251.000 122.0 158.341 4.430 -999.990 -999.990 1.583 ..P WKT 2010 05 17 18 04 55 31.3200 -97.3300 251.000 457.0 150.781 3.130 -999.990 -999.990 1.508 ..P WKT 2010 05 17 18 14 55 31.3200 -97.3300 251.000 30.0 142.290 4.180 -999.990 -999.990 1.423 ..P WKT 2010 05 17 18 19 55 31.3200 -97.3300 251.000 122.0 150.018 3.260 -999.990 -999.990 1.500 ..P WKT 2010 05 17 18 24 55 31.3200 -97.3300 251.000 457.0 141.264 3.730 -999.990 -999.990 1.413 ..P WKT 2010 05 17 18 29 55 31.3200 -97.3300 251.000 30.0 147.594 3.520 -999.990 -999.990 1.476 ..P WKT 2010 05 17 18 34 55 31.3200 -97.3300 251.000 122.0 156.157 4.020 -999.990 -999.990 1.562 ..P WKT 2010 05 17 18 39 55 31.3200 -97.3300 251.000 457.0 139.305 3.770 -999.990 -999.990 1.393 ..P WKT 2010 05 17 18 49 55 31.3200 -97.3300 251.000 30.0 139.137 4.300 -999.990 -999.990 1.391 ..P WKT 2010 05 17 18 54 55 31.3200 -97.3300 251.000 122.0 150.790 4.280 -999.990 -999.990 1.508 ..P WKT 2010 05 17 18 59 55 31.3200 -97.3300 251.000 457.0 146.806 5.450 -999.990 -999.990 1.468 ..P WKT 2010 05 17 19 04 55 31.3200 -97.3300 251.000 30.0 145.895 4.940 -999.990 -999.990 1.459 ..P WKT 2010 05 17 19 09 55 31.3200 -97.3300 251.000 122.0 149.170 5.130 -999.990 -999.990 1.492 ..P WKT 2010 05 17 19 14 55 31.3200 -97.3300 251.000 457.0 146.722 5.490 -999.990 -999.990 1.467 ..P WKT 2010 05 17 19 24 55 31.3200 -97.3300 251.000 30.0 143.025 5.280 -999.990 -999.990 1.430 ..P WKT 2010 05 17 19 29 55 31.3200 -97.3300 251.000 122.0 151.821 5.180 -999.990 -999.990 1.518 ..P WKT 2010 05 17 19 34 55 31.3200 -97.3300 251.000 457.0 139.687 4.320 -999.990 -999.990 1.397 ..P WKT 2010 05 17 19 39 55 31.3200 -97.3300 251.000 30.0 139.972 4.600 -999.990 -999.990 1.400 ..P WKT 2010 05 17 19 44 55 31.3200 -97.3300 251.000 122.0 152.533 4.250 -999.990 -999.990 1.525 ..P WKT 2010 05 17 19 49 55 31.3200 -97.3300 251.000 457.0 139.983 3.280 -999.990 -999.990 1.400 ..P WKT 2010 05 17 19 59 55 31.3200 -97.3300 251.000 30.0 146.689 3.760 -999.990 -999.990 1.467 ..P WKT 2010 05 17 20 04 55 31.3200 -97.3300 251.000 122.0 150.321 4.360 -999.990 -999.990 1.503 ..P WKT 2010 05 17 20 09 55 31.3200 -97.3300 251.000 457.0 144.050 4.380 -999.990 -999.990 1.441 ..P WKT 2010 05 17 20 14 55 31.3200 -97.3300 251.000 30.0 151.865 3.740 -999.990 -999.990 1.519 ..P WKT 2010 05 17 20 19 55 31.3200 -97.3300 251.000 122.0 150.893 3.810 -999.990 -999.990 1.509 ..P WKT 2010 05 17 20 24 55 31.3200 -97.3300 251.000 457.0 146.158 3.790 -999.990 -999.990 1.462 ..P WKT 2010 05 17 20 34 55 31.3200 -97.3300 251.000 30.0 141.288 3.690 -999.990 -999.990 1.413 ..P WKT 2010 05 17 20 39 55 31.3200 -97.3300 251.000 122.0 145.337 3.170 -999.990 -999.990 1.453 ..P WKT 2010 05 17 20 44 55 31.3200 -97.3300 251.000 457.0 142.415 3.820 -999.990 -999.990 1.424 ..P WKT 2010 05 17 20 49 55 31.3200 -97.3300 251.000 30.0 145.347 2.950 -999.990 -999.990 1.453 ..P WKT 2010 05 17 20 54 55 31.3200 -97.3300 251.000 122.0 156.084 4.790 -999.990 -999.990 1.561 ..P WKT 2010 05 17 20 59 55 31.3200 -97.3300 251.000 457.0 141.456 2.860 -999.990 -999.990 1.415 ..P WKT 2010 05 17 21 09 55 31.3200 -97.3300 251.000 30.0 144.174 2.890 -999.990 -999.990 1.442 ..P WKT 2010 05 17 21 14 55 31.3200 -97.3300 251.000 122.0 147.583 3.090 -999.990 -999.990 1.476 ..P WKT 2010 05 17 21 19 55 31.3200 -97.3300 251.000 457.0 144.025 3.640 -999.990 -999.990 1.440 ..P WKT 2010 05 17 21 24 55 31.3200 -97.3300 251.000 30.0 139.632 3.510 -999.990 -999.990 1.396 ..P WKT 2010 05 17 21 29 55 31.3200 -97.3300 251.000 122.0 138.862 3.330 -999.990 -999.990 1.389 ..P WKT 2010 05 17 21 34 55 31.3200 -97.3300 251.000 457.0 136.141 3.860 -999.990 -999.990 1.361 ..P WKT 2010 05 17 21 44 55 31.3200 -97.3300 251.000 30.0 143.674 3.590 -999.990 -999.990 1.437 ..P WKT 2010 05 17 21 49 55 31.3200 -97.3300 251.000 122.0 145.291 4.650 -999.990 -999.990 1.453 ..P WKT 2010 05 17 21 54 55 31.3200 -97.3300 251.000 457.0 144.401 3.190 -999.990 -999.990 1.444 ..P WKT 2010 05 17 21 59 55 31.3200 -97.3300 251.000 30.0 143.233 3.650 -999.990 -999.990 1.432 ..P WKT 2010 05 17 22 04 25 31.3200 -97.3300 251.000 122.0 144.799 3.140 -999.990 -999.990 1.448 ..P WKT 2010 05 17 22 04 55 31.3200 -97.3300 251.000 122.0 147.077 3.260 -999.990 -999.990 1.471 ..P WKT 2010 05 17 22 09 55 31.3200 -97.3300 251.000 457.0 142.289 3.600 -999.990 -999.990 1.423 ..P WKT 2010 05 17 22 19 55 31.3200 -97.3300 251.000 30.0 146.556 3.200 -999.990 -999.990 1.466 ..P WKT 2010 05 17 22 24 55 31.3200 -97.3300 251.000 122.0 164.796 3.720 -999.990 -999.990 1.648 ..P WKT 2010 05 17 22 29 55 31.3200 -97.3300 251.000 457.0 161.877 4.690 -999.990 -999.990 1.619 ..P WKT 2010 05 17 22 34 55 31.3200 -97.3300 251.000 30.0 161.185 5.420 -999.990 -999.990 1.612 ..P WKT 2010 05 17 22 39 55 31.3200 -97.3300 251.000 122.0 162.720 4.860 -999.990 -999.990 1.627 ..P WKT 2010 05 17 22 44 55 31.3200 -97.3300 251.000 457.0 153.123 4.560 -999.990 -999.990 1.531 ..P WKT 2010 05 17 22 54 55 31.3200 -97.3300 251.000 30.0 143.571 4.960 -999.990 -999.990 1.436 ..P WKT 2010 05 17 22 59 55 31.3200 -97.3300 251.000 122.0 145.842 5.080 -999.990 -999.990 1.458 ..P WKT 2010 05 17 23 04 55 31.3200 -97.3300 251.000 457.0 144.774 3.970 -999.990 -999.990 1.448 ..P WKT 2010 05 17 23 09 55 31.3200 -97.3300 251.000 30.0 132.577 4.950 -999.990 -999.990 1.326 ..P WKT 2010 05 17 23 14 55 31.3200 -97.3300 251.000 122.0 136.518 3.630 -999.990 -999.990 1.365 ..P WKT 2010 05 17 23 19 55 31.3200 -97.3300 251.000 457.0 129.470 3.420 -999.990 -999.990 1.295 ..P WKT 2010 05 17 23 29 55 31.3200 -97.3300 251.000 30.0 138.681 3.030 -999.990 -999.990 1.387 ..P WKT 2010 05 17 23 34 55 31.3200 -97.3300 251.000 122.0 139.223 3.810 -999.990 -999.990 1.392 ..P WKT 2010 05 17 23 39 55 31.3200 -97.3300 251.000 457.0 133.508 2.940 -999.990 -999.990 1.335 ..P WKT 2010 05 17 23 44 55 31.3200 -97.3300 251.000 30.0 135.441 3.830 -999.990 -999.990 1.354 ..P WKT 2010 05 17 23 49 55 31.3200 -97.3300 251.000 122.0 128.753 3.560 -999.990 -999.990 1.288 ..P WKT 2010 05 18 00 09 55 31.3200 -97.3300 251.000 457.0 132.138 3.240 -999.990 -999.990 1.321 ..P WKT 2010 05 18 00 10 25 31.3200 -97.3300 251.000 457.0 136.232 3.970 -999.990 -999.990 1.362 ..P WKT 2010 05 18 00 10 55 31.3200 -97.3300 251.000 457.0 134.487 3.180 -999.990 -999.990 1.345 ..P WKT 2010 05 18 00 11 25 31.3200 -97.3300 251.000 457.0 135.105 3.230 -999.990 -999.990 1.351 ..P WKT 2010 05 18 00 11 55 31.3200 -97.3300 251.000 457.0 134.333 4.760 -999.990 -999.990 1.343 ..P WKT 2010 05 18 00 12 25 31.3200 -97.3300 251.000 457.0 129.391 3.240 -999.990 -999.990 1.294 ..P WKT 2010 05 18 00 12 55 31.3200 -97.3300 251.000 457.0 134.040 3.260 -999.990 -999.990 1.340 ..P WKT 2010 05 18 00 13 25 31.3200 -97.3300 251.000 457.0 134.519 3.020 -999.990 -999.990 1.345 ..P WKT 2010 05 18 00 13 55 31.3200 -97.3300 251.000 457.0 133.886 3.120 -999.990 -999.990 1.339 ..P WKT 2010 05 18 00 14 25 31.3200 -97.3300 251.000 457.0 136.173 3.830 -999.990 -999.990 1.362 ..P WKT 2010 05 18 00 14 55 31.3200 -97.3300 251.000 457.0 135.123 4.070 -999.990 -999.990 1.351 ..P WKT 2010 05 18 00 19 55 31.3200 -97.3300 251.000 30.0 132.546 3.100 -999.990 -999.990 1.325 ..P WKT 2010 05 18 00 24 55 31.3200 -97.3300 251.000 122.0 134.280 3.820 -999.990 -999.990 1.343 ..P WKT 2010 05 18 00 29 55 31.3200 -97.3300 251.000 457.0 133.511 4.330 -999.990 -999.990 1.335 ..P WKT 2010 05 18 00 34 55 31.3200 -97.3300 251.000 30.0 133.021 4.210 -999.990 -999.990 1.330 ..P WKT 2010 05 18 00 39 55 31.3200 -97.3300 251.000 122.0 142.680 3.570 -999.990 -999.990 1.427 ..P WKT 2010 05 18 00 44 55 31.3200 -97.3300 251.000 457.0 132.873 3.070 -999.990 -999.990 1.329 ..P WKT 2010 05 18 00 54 55 31.3200 -97.3300 251.000 30.0 136.656 3.200 -999.990 -999.990 1.367 ..P WKT 2010 05 18 00 59 55 31.3200 -97.3300 251.000 122.0 147.188 3.910 -999.990 -999.990 1.472 ..P WKT 2010 05 18 01 04 55 31.3200 -97.3300 251.000 457.0 139.504 4.720 -999.990 -999.990 1.395 ..P WKT 2010 05 18 01 09 55 31.3200 -97.3300 251.000 30.0 144.613 3.590 -999.990 -999.990 1.446 ..P WKT 2010 05 18 01 14 55 31.3200 -97.3300 251.000 122.0 152.921 3.460 -999.990 -999.990 1.529 ..P WKT 2010 05 18 01 19 55 31.3200 -97.3300 251.000 457.0 137.171 3.740 -999.990 -999.990 1.372 ..P WKT 2010 05 18 01 29 55 31.3200 -97.3300 251.000 30.0 148.720 4.140 -999.990 -999.990 1.487 ..P WKT 2010 05 18 01 34 55 31.3200 -97.3300 251.000 122.0 147.095 3.490 -999.990 -999.990 1.471 ..P WKT 2010 05 18 01 39 55 31.3200 -97.3300 251.000 457.0 137.403 3.590 -999.990 -999.990 1.374 ..P WKT 2010 05 18 01 44 55 31.3200 -97.3300 251.000 30.0 148.295 3.800 -999.990 -999.990 1.483 ..P WKT 2010 05 18 01 49 55 31.3200 -97.3300 251.000 122.0 137.490 3.800 -999.990 -999.990 1.375 ..P WKT 2010 05 18 01 54 55 31.3200 -97.3300 251.000 457.0 130.857 3.130 -999.990 -999.990 1.309 ..P WKT 2010 05 18 02 04 55 31.3200 -97.3300 251.000 30.0 141.991 4.710 -999.990 -999.990 1.420 ..P WKT 2010 05 18 02 09 55 31.3200 -97.3300 251.000 122.0 145.571 4.600 -999.990 -999.990 1.456 ..P WKT 2010 05 18 02 14 55 31.3200 -97.3300 251.000 457.0 131.904 5.270 -999.990 -999.990 1.319 ..P WKT 2010 05 18 02 19 55 31.3200 -97.3300 251.000 30.0 151.342 4.400 -999.990 -999.990 1.513 ..P WKT 2010 05 18 02 24 55 31.3200 -97.3300 251.000 122.0 139.343 4.400 -999.990 -999.990 1.393 ..P WKT 2010 05 18 02 29 55 31.3200 -97.3300 251.000 457.0 133.464 3.270 -999.990 -999.990 1.335 ..P WKT 2010 05 18 02 39 55 31.3200 -97.3300 251.000 30.0 148.058 3.690 -999.990 -999.990 1.481 ..P WKT 2010 05 18 02 44 55 31.3200 -97.3300 251.000 122.0 138.204 4.070 -999.990 -999.990 1.382 ..P WKT 2010 05 18 02 49 55 31.3200 -97.3300 251.000 457.0 134.193 5.130 -999.990 -999.990 1.342 ..P WKT 2010 05 18 02 54 55 31.3200 -97.3300 251.000 30.0 145.207 4.940 -999.990 -999.990 1.452 ..P WKT 2010 05 18 02 59 55 31.3200 -97.3300 251.000 122.0 143.422 3.380 -999.990 -999.990 1.434 ..P WKT 2010 05 18 03 04 55 31.3200 -97.3300 251.000 457.0 127.445 4.000 -999.990 -999.990 1.274 ..P WKT 2010 05 18 03 14 55 31.3200 -97.3300 251.000 30.0 143.175 3.980 -999.990 -999.990 1.432 ..P WKT 2010 05 18 03 19 55 31.3200 -97.3300 251.000 122.0 140.654 4.480 -999.990 -999.990 1.407 ..P WKT 2010 05 18 03 24 55 31.3200 -97.3300 251.000 457.0 125.332 4.100 -999.990 -999.990 1.253 ..P WKT 2010 05 18 03 29 55 31.3200 -97.3300 251.000 30.0 148.274 6.980 -999.990 -999.990 1.483 ..P WKT 2010 05 18 03 34 55 31.3200 -97.3300 251.000 122.0 135.596 4.530 -999.990 -999.990 1.356 ..P WKT 2010 05 18 03 39 55 31.3200 -97.3300 251.000 457.0 131.683 4.950 -999.990 -999.990 1.317 ..P WKT 2010 05 18 03 49 55 31.3200 -97.3300 251.000 30.0 149.065 4.650 -999.990 -999.990 1.491 ..P WKT 2010 05 18 03 54 55 31.3200 -97.3300 251.000 122.0 155.191 4.840 -999.990 -999.990 1.552 ..P WKT 2010 05 18 03 59 55 31.3200 -97.3300 251.000 457.0 134.599 4.880 -999.990 -999.990 1.346 ..P WKT 2010 05 18 04 04 55 31.3200 -97.3300 251.000 30.0 149.772 5.390 -999.990 -999.990 1.498 ..P WKT 2010 05 18 04 09 55 31.3200 -97.3300 251.000 122.0 144.627 4.230 -999.990 -999.990 1.446 ..P WKT 2010 05 18 04 14 55 31.3200 -97.3300 251.000 457.0 127.929 4.010 -999.990 -999.990 1.279 ..P WKT 2010 05 18 04 24 55 31.3200 -97.3300 251.000 30.0 145.512 3.770 -999.990 -999.990 1.455 ..P WKT 2010 05 18 04 29 55 31.3200 -97.3300 251.000 122.0 136.927 4.010 -999.990 -999.990 1.369 ..P WKT 2010 05 18 04 34 55 31.3200 -97.3300 251.000 457.0 124.721 4.320 -999.990 -999.990 1.247 ..P WKT 2010 05 18 04 39 55 31.3200 -97.3300 251.000 30.0 144.668 3.780 -999.990 -999.990 1.447 ..P WKT 2010 05 18 04 44 55 31.3200 -97.3300 251.000 122.0 139.422 3.800 -999.990 -999.990 1.394 ..P WKT 2010 05 18 04 49 55 31.3200 -97.3300 251.000 457.0 149.209 3.570 -999.990 -999.990 1.492 ..P WKT 2010 05 18 05 04 55 31.3200 -97.3300 251.000 30.0 143.066 3.020 -999.990 -999.990 1.431 ..P WKT 2010 05 18 05 09 55 31.3200 -97.3300 251.000 122.0 127.235 4.290 -999.990 -999.990 1.272 ..P WKT 2010 05 18 05 14 55 31.3200 -97.3300 251.000 457.0 132.563 4.100 -999.990 -999.990 1.326 ..P WKT 2010 05 18 05 19 55 31.3200 -97.3300 251.000 30.0 136.499 4.510 -999.990 -999.990 1.365 ..P WKT 2010 05 18 05 24 55 31.3200 -97.3300 251.000 122.0 132.083 3.820 -999.990 -999.990 1.321 ..P WKT 2010 05 18 05 29 55 31.3200 -97.3300 251.000 457.0 133.235 2.950 -999.990 -999.990 1.332 ..P WKT 2010 05 18 05 39 55 31.3200 -97.3300 251.000 30.0 141.949 2.970 -999.990 -999.990 1.419 ..P WKT 2010 05 18 05 44 55 31.3200 -97.3300 251.000 122.0 131.132 3.790 -999.990 -999.990 1.311 ..P WKT 2010 05 18 05 49 55 31.3200 -97.3300 251.000 457.0 129.505 4.040 -999.990 -999.990 1.295 ..P WKT 2010 05 18 05 54 55 31.3200 -97.3300 251.000 30.0 141.800 3.650 -999.990 -999.990 1.418 ..P WKT 2010 05 18 05 59 55 31.3200 -97.3300 251.000 122.0 134.882 3.490 -999.990 -999.990 1.349 ..P WKT 2010 05 18 06 04 55 31.3200 -97.3300 251.000 457.0 133.532 2.810 -999.990 -999.990 1.335 ..P WKT 2010 05 18 06 14 55 31.3200 -97.3300 251.000 30.0 142.968 3.110 -999.990 -999.990 1.430 ..P WKT 2010 05 18 06 19 55 31.3200 -97.3300 251.000 122.0 135.930 4.200 -999.990 -999.990 1.359 ..P WKT 2010 05 18 06 24 55 31.3200 -97.3300 251.000 457.0 137.246 4.270 -999.990 -999.990 1.372 ..P WKT 2010 05 18 06 29 55 31.3200 -97.3300 251.000 30.0 142.462 4.410 -999.990 -999.990 1.425 ..P WKT 2010 05 18 06 34 55 31.3200 -97.3300 251.000 122.0 140.715 5.450 -999.990 -999.990 1.407 ..P WKT 2010 05 18 06 39 55 31.3200 -97.3300 251.000 457.0 133.676 5.600 -999.990 -999.990 1.337 ..P WKT 2010 05 18 06 49 55 31.3200 -97.3300 251.000 30.0 139.512 5.820 -999.990 -999.990 1.395 ..P WKT 2010 05 18 06 54 55 31.3200 -97.3300 251.000 122.0 136.511 5.370 -999.990 -999.990 1.365 ..P WKT 2010 05 18 06 59 55 31.3200 -97.3300 251.000 457.0 127.661 5.200 -999.990 -999.990 1.277 ..P WKT 2010 05 18 07 04 55 31.3200 -97.3300 251.000 30.0 142.766 5.020 -999.990 -999.990 1.428 ..P WKT 2010 05 18 07 09 55 31.3200 -97.3300 251.000 122.0 141.715 4.510 -999.990 -999.990 1.417 ..P WKT 2010 05 18 07 14 55 31.3200 -97.3300 251.000 457.0 133.560 3.670 -999.990 -999.990 1.336 ..P WKT 2010 05 18 07 24 55 31.3200 -97.3300 251.000 30.0 132.155 4.470 -999.990 -999.990 1.322 ..P WKT 2010 05 18 07 29 55 31.3200 -97.3300 251.000 122.0 144.336 3.810 -999.990 -999.990 1.443 ..P WKT 2010 05 18 07 34 55 31.3200 -97.3300 251.000 457.0 132.141 3.760 -999.990 -999.990 1.321 ..P WKT 2010 05 18 07 39 55 31.3200 -97.3300 251.000 30.0 142.234 4.640 -999.990 -999.990 1.422 ..P WKT 2010 05 18 07 44 55 31.3200 -97.3300 251.000 122.0 138.676 4.550 -999.990 -999.990 1.387 ..P WKT 2010 05 18 07 49 55 31.3200 -97.3300 251.000 457.0 132.191 5.940 -999.990 -999.990 1.322 ..P WKT 2010 05 18 07 59 55 31.3200 -97.3300 251.000 30.0 149.354 4.540 -999.990 -999.990 1.494 ..P WKT 2010 05 18 08 04 55 31.3200 -97.3300 251.000 122.0 142.769 4.740 -999.990 -999.990 1.428 ..P WKT 2010 05 18 08 09 55 31.3200 -97.3300 251.000 457.0 137.161 4.240 -999.990 -999.990 1.372 ..P WKT 2010 05 18 08 14 55 31.3200 -97.3300 251.000 30.0 142.976 3.740 -999.990 -999.990 1.430 ..P WKT 2010 05 18 08 19 55 31.3200 -97.3300 251.000 122.0 142.104 3.870 -999.990 -999.990 1.421 ..P WKT 2010 05 18 08 24 55 31.3200 -97.3300 251.000 457.0 136.634 3.690 -999.990 -999.990 1.366 ..P WKT 2010 05 18 08 34 55 31.3200 -97.3300 251.000 30.0 141.279 3.220 -999.990 -999.990 1.413 ..P WKT 2010 05 18 08 39 55 31.3200 -97.3300 251.000 122.0 142.895 4.010 -999.990 -999.990 1.429 ..P WKT 2010 05 18 08 44 55 31.3200 -97.3300 251.000 457.0 129.741 3.230 -999.990 -999.990 1.297 ..P WKT 2010 05 18 08 49 55 31.3200 -97.3300 251.000 30.0 136.652 3.480 -999.990 -999.990 1.367 ..P WKT 2010 05 18 08 54 55 31.3200 -97.3300 251.000 122.0 142.309 3.540 -999.990 -999.990 1.423 ..P WKT 2010 05 18 08 59 55 31.3200 -97.3300 251.000 457.0 134.867 3.920 -999.990 -999.990 1.349 ..P WKT 2010 05 18 09 09 55 31.3200 -97.3300 251.000 30.0 134.257 3.340 -999.990 -999.990 1.343 ..P WKT 2010 05 18 09 14 55 31.3200 -97.3300 251.000 122.0 130.916 3.790 -999.990 -999.990 1.309 ..P WKT 2010 05 18 09 19 55 31.3200 -97.3300 251.000 457.0 133.986 3.260 -999.990 -999.990 1.340 ..P WKT 2010 05 18 09 24 55 31.3200 -97.3300 251.000 30.0 133.989 3.100 -999.990 -999.990 1.340 ..P WKT 2010 05 18 09 29 55 31.3200 -97.3300 251.000 122.0 141.518 3.720 -999.990 -999.990 1.415 ..P WKT 2010 05 18 09 34 55 31.3200 -97.3300 251.000 457.0 130.372 3.820 -999.990 -999.990 1.304 ..P WKT 2010 05 18 09 44 55 31.3200 -97.3300 251.000 30.0 138.901 4.620 -999.990 -999.990 1.389 ..P WKT 2010 05 18 09 49 55 31.3200 -97.3300 251.000 122.0 141.294 4.430 -999.990 -999.990 1.413 ..P WKT 2010 05 18 09 54 55 31.3200 -97.3300 251.000 457.0 123.337 4.360 -999.990 -999.990 1.233 ..P WKT 2010 05 18 09 59 55 31.3200 -97.3300 251.000 30.0 134.093 3.680 -999.990 -999.990 1.341 ..P WKT 2010 05 18 10 04 55 31.3200 -97.3300 251.000 122.0 134.256 4.510 -999.990 -999.990 1.343 ..P WKT 2010 05 18 10 09 55 31.3200 -97.3300 251.000 457.0 131.909 4.090 -999.990 -999.990 1.319 ..P WKT 2010 05 18 10 19 55 31.3200 -97.3300 251.000 30.0 140.280 4.100 -999.990 -999.990 1.403 ..P WKT 2010 05 18 10 24 55 31.3200 -97.3300 251.000 122.0 133.991 4.000 -999.990 -999.990 1.340 ..P WKT 2010 05 18 10 29 55 31.3200 -97.3300 251.000 457.0 131.883 3.700 -999.990 -999.990 1.319 ..P WKT 2010 05 18 10 34 55 31.3200 -97.3300 251.000 30.0 137.861 3.770 -999.990 -999.990 1.379 ..P WKT 2010 05 18 10 39 55 31.3200 -97.3300 251.000 122.0 137.426 3.600 -999.990 -999.990 1.374 ..P WKT 2010 05 18 10 44 55 31.3200 -97.3300 251.000 457.0 134.761 4.900 -999.990 -999.990 1.348 ..P WKT 2010 05 18 10 54 55 31.3200 -97.3300 251.000 30.0 138.991 3.370 -999.990 -999.990 1.390 ..P WKT 2010 05 18 10 59 55 31.3200 -97.3300 251.000 122.0 138.078 3.770 -999.990 -999.990 1.381 ..P WKT 2010 05 18 11 04 55 31.3200 -97.3300 251.000 457.0 134.655 4.680 -999.990 -999.990 1.347 ..P WKT 2010 05 18 11 09 55 31.3200 -97.3300 251.000 30.0 144.339 3.420 -999.990 -999.990 1.443 ..P WKT 2010 05 18 11 14 55 31.3200 -97.3300 251.000 122.0 128.368 3.800 -999.990 -999.990 1.284 ..P WKT 2010 05 18 11 19 55 31.3200 -97.3300 251.000 457.0 131.777 3.580 -999.990 -999.990 1.318 ..P WKT 2010 05 18 11 29 55 31.3200 -97.3300 251.000 30.0 156.839 4.850 -999.990 -999.990 1.568 ..P WKT 2010 05 18 11 34 55 31.3200 -97.3300 251.000 122.0 150.743 3.650 -999.990 -999.990 1.507 ..P WKT 2010 05 18 11 39 55 31.3200 -97.3300 251.000 457.0 126.099 4.920 -999.990 -999.990 1.261 ..P WKT 2010 05 18 11 44 55 31.3200 -97.3300 251.000 30.0 151.517 3.970 -999.990 -999.990 1.515 ..P WKT 2010 05 18 11 49 55 31.3200 -97.3300 251.000 122.0 139.423 4.050 -999.990 -999.990 1.394 ..P WKT 2010 05 18 12 09 55 31.3200 -97.3300 251.000 457.0 137.000 3.900 -999.990 -999.990 1.370 ..P WKT 2010 05 18 12 10 25 31.3200 -97.3300 251.000 457.0 130.707 2.870 -999.990 -999.990 1.307 ..P WKT 2010 05 18 12 10 55 31.3200 -97.3300 251.000 457.0 136.127 3.930 -999.990 -999.990 1.361 ..P WKT 2010 05 18 12 11 25 31.3200 -97.3300 251.000 457.0 135.133 5.020 -999.990 -999.990 1.351 ..P WKT 2010 05 18 12 11 55 31.3200 -97.3300 251.000 457.0 127.864 3.200 -999.990 -999.990 1.279 ..P WKT 2010 05 18 12 12 25 31.3200 -97.3300 251.000 457.0 129.241 2.790 -999.990 -999.990 1.292 ..P WKT 2010 05 18 12 12 55 31.3200 -97.3300 251.000 457.0 134.940 3.520 -999.990 -999.990 1.349 ..P WKT 2010 05 18 12 13 25 31.3200 -97.3300 251.000 457.0 138.129 2.860 -999.990 -999.990 1.381 ..P WKT 2010 05 18 12 13 55 31.3200 -97.3300 251.000 457.0 140.621 2.950 -999.990 -999.990 1.406 ..P WKT 2010 05 18 12 14 25 31.3200 -97.3300 251.000 457.0 134.607 3.720 -999.990 -999.990 1.346 ..P WKT 2010 05 18 12 14 55 31.3200 -97.3300 251.000 457.0 140.167 3.760 -999.990 -999.990 1.402 ..P WKT 2010 05 18 12 19 55 31.3200 -97.3300 251.000 30.0 157.556 4.550 -999.990 -999.990 1.576 ..P WKT 2010 05 18 12 24 55 31.3200 -97.3300 251.000 122.0 135.067 3.170 -999.990 -999.990 1.351 ..P WKT 2010 05 18 12 29 55 31.3200 -97.3300 251.000 457.0 129.172 2.800 -999.990 -999.990 1.292 ..P WKT 2010 05 18 12 34 55 31.3200 -97.3300 251.000 30.0 161.335 3.040 -999.990 -999.990 1.613 ..P WKT 2010 05 18 12 39 55 31.3200 -97.3300 251.000 122.0 144.148 3.150 -999.990 -999.990 1.441 ..P WKT 2010 05 18 12 44 55 31.3200 -97.3300 251.000 457.0 140.065 4.340 -999.990 -999.990 1.401 ..P WKT 2010 05 18 12 54 55 31.3200 -97.3300 251.000 30.0 167.629 3.280 -999.990 -999.990 1.676 ..P WKT 2010 05 18 12 59 55 31.3200 -97.3300 251.000 122.0 135.995 4.060 -999.990 -999.990 1.360 ..P WKT 2010 05 18 13 04 55 31.3200 -97.3300 251.000 457.0 143.667 3.600 -999.990 -999.990 1.437 ..P WKT 2010 05 18 13 09 55 31.3200 -97.3300 251.000 30.0 163.044 5.370 -999.990 -999.990 1.630 ..P WKT 2010 05 18 13 14 55 31.3200 -97.3300 251.000 122.0 142.285 4.730 -999.990 -999.990 1.423 ..P WKT 2010 05 18 13 19 55 31.3200 -97.3300 251.000 457.0 132.537 5.630 -999.990 -999.990 1.325 ..P WKT 2010 05 18 13 29 55 31.3200 -97.3300 251.000 30.0 166.945 3.990 -999.990 -999.990 1.669 ..P WKT 2010 05 18 13 34 55 31.3200 -97.3300 251.000 122.0 158.153 4.430 -999.990 -999.990 1.582 ..P WKT 2010 05 18 13 39 55 31.3200 -97.3300 251.000 457.0 135.430 4.100 -999.990 -999.990 1.354 ..P WKT 2010 05 18 13 44 55 31.3200 -97.3300 251.000 30.0 175.956 2.990 -999.990 -999.990 1.760 ..P WKT 2010 05 18 13 49 55 31.3200 -97.3300 251.000 122.0 150.448 2.740 -999.990 -999.990 1.504 ..P WKT 2010 05 18 13 54 55 31.3200 -97.3300 251.000 457.0 128.007 3.610 -999.990 -999.990 1.280 ..P WKT 2010 05 18 14 04 55 31.3200 -97.3300 251.000 30.0 162.920 3.390 -999.990 -999.990 1.629 ..P WKT 2010 05 18 14 09 55 31.3200 -97.3300 251.000 122.0 160.936 2.740 -999.990 -999.990 1.609 ..P WKT 2010 05 18 14 14 55 31.3200 -97.3300 251.000 457.0 139.176 3.390 -999.990 -999.990 1.392 ..P WKT 2010 05 18 14 19 55 31.3200 -97.3300 251.000 30.0 155.018 2.900 -999.990 -999.990 1.550 ..P WKT 2010 05 18 14 24 55 31.3200 -97.3300 251.000 122.0 155.262 2.490 -999.990 -999.990 1.553 ..P WKT 2010 05 18 14 29 55 31.3200 -97.3300 251.000 457.0 139.075 2.250 -999.990 -999.990 1.391 ..P WKT 2010 05 18 14 39 55 31.3200 -97.3300 251.000 30.0 146.348 4.370 -999.990 -999.990 1.463 ..P WKT 2010 05 18 14 44 55 31.3200 -97.3300 251.000 122.0 154.210 3.330 -999.990 -999.990 1.542 ..P WKT 2010 05 18 14 49 55 31.3200 -97.3300 251.000 457.0 139.797 2.780 -999.990 -999.990 1.398 ..P WKT 2010 05 18 14 54 55 31.3200 -97.3300 251.000 30.0 146.267 2.510 -999.990 -999.990 1.463 ..P WKT 2010 05 18 14 59 55 31.3200 -97.3300 251.000 122.0 158.303 3.910 -999.990 -999.990 1.583 ..P WKT 2010 05 18 15 04 55 31.3200 -97.3300 251.000 457.0 133.870 3.090 -999.990 -999.990 1.339 ..P WKT 2010 05 18 15 14 55 31.3200 -97.3300 251.000 30.0 147.920 3.180 -999.990 -999.990 1.479 ..P WKT 2010 05 18 15 19 55 31.3200 -97.3300 251.000 122.0 153.275 3.670 -999.990 -999.990 1.533 ..P WKT 2010 05 18 15 24 55 31.3200 -97.3300 251.000 457.0 147.912 2.770 -999.990 -999.990 1.479 ..P WKT 2010 05 18 15 29 55 31.3200 -97.3300 251.000 30.0 151.178 3.080 -999.990 -999.990 1.512 ..P WKT 2010 05 18 15 34 55 31.3200 -97.3300 251.000 122.0 150.965 3.140 -999.990 -999.990 1.510 ..P WKT 2010 05 18 15 39 55 31.3200 -97.3300 251.000 457.0 150.196 2.910 -999.990 -999.990 1.502 ..P WKT 2010 05 18 15 49 55 31.3200 -97.3300 251.000 30.0 157.581 3.340 -999.990 -999.990 1.576 ..P WKT 2010 05 18 15 54 55 31.3200 -97.3300 251.000 122.0 155.996 3.410 -999.990 -999.990 1.560 ..P WKT 2010 05 18 15 59 55 31.3200 -97.3300 251.000 457.0 150.655 3.310 -999.990 -999.990 1.507 ..P WKT 2010 05 18 16 04 55 31.3200 -97.3300 251.000 30.0 149.350 3.380 -999.990 -999.990 1.494 ..P WKT 2010 05 18 16 09 55 31.3200 -97.3300 251.000 122.0 156.251 3.570 -999.990 -999.990 1.563 ..P WKT 2010 05 18 16 14 55 31.3200 -97.3300 251.000 457.0 154.388 3.960 -999.990 -999.990 1.544 ..P WKT 2010 05 18 16 24 55 31.3200 -97.3300 251.000 30.0 165.446 4.120 -999.990 -999.990 1.654 ..P WKT 2010 05 18 16 29 55 31.3200 -97.3300 251.000 122.0 158.061 3.840 -999.990 -999.990 1.581 ..P WKT 2010 05 18 16 34 55 31.3200 -97.3300 251.000 457.0 155.404 3.480 -999.990 -999.990 1.554 ..P WKT 2010 05 18 16 39 55 31.3200 -97.3300 251.000 30.0 155.529 4.050 -999.990 -999.990 1.555 ..P WKT 2010 05 18 16 44 55 31.3200 -97.3300 251.000 122.0 165.664 4.110 -999.990 -999.990 1.657 ..P WKT 2010 05 18 16 49 55 31.3200 -97.3300 251.000 457.0 154.387 4.070 -999.990 -999.990 1.544 ..P WKT 2010 05 18 17 04 55 31.3200 -97.3300 251.000 30.0 153.967 4.680 -999.990 -999.990 1.540 ..P WKT 2010 05 18 17 09 55 31.3200 -97.3300 251.000 122.0 153.347 3.390 -999.990 -999.990 1.533 ..P WKT 2010 05 18 17 14 55 31.3200 -97.3300 251.000 457.0 154.256 4.590 -999.990 -999.990 1.543 ..P WKT 2010 05 18 17 19 55 31.3200 -97.3300 251.000 30.0 156.555 3.400 -999.990 -999.990 1.566 ..P WKT 2010 05 18 17 24 55 31.3200 -97.3300 251.000 122.0 159.409 5.980 -999.990 -999.990 1.594 ..P WKT 2010 05 18 17 29 55 31.3200 -97.3300 251.000 457.0 148.643 3.560 -999.990 -999.990 1.486 ..P WKT 2010 05 18 17 39 55 31.3200 -97.3300 251.000 30.0 151.623 3.230 -999.990 -999.990 1.516 ..P WKT 2010 05 18 17 44 55 31.3200 -97.3300 251.000 122.0 150.636 3.940 -999.990 -999.990 1.506 ..P WKT 2010 05 18 17 49 55 31.3200 -97.3300 251.000 457.0 150.206 3.020 -999.990 -999.990 1.502 ..P WKT 2010 05 18 17 54 55 31.3200 -97.3300 251.000 30.0 148.385 4.830 -999.990 -999.990 1.484 ..P WKT 2010 05 18 17 59 55 31.3200 -97.3300 251.000 122.0 148.232 2.970 -999.990 -999.990 1.482 ..P WKT 2010 05 18 18 04 55 31.3200 -97.3300 251.000 457.0 151.969 3.230 -999.990 -999.990 1.520 ..P WKT 2010 05 18 18 14 55 31.3200 -97.3300 251.000 30.0 155.196 3.880 -999.990 -999.990 1.552 ..P WKT 2010 05 18 18 19 55 31.3200 -97.3300 251.000 122.0 149.407 3.590 -999.990 -999.990 1.494 ..P WKT 2010 05 18 18 24 55 31.3200 -97.3300 251.000 457.0 146.396 2.870 -999.990 -999.990 1.464 ..P WKT 2010 05 18 18 29 55 31.3200 -97.3300 251.000 30.0 151.442 2.610 -999.990 -999.990 1.514 ..P WKT 2010 05 18 18 34 55 31.3200 -97.3300 251.000 122.0 157.043 2.370 -999.990 -999.990 1.570 ..P WKT 2010 05 18 18 39 55 31.3200 -97.3300 251.000 457.0 149.310 4.310 -999.990 -999.990 1.493 ..P WKT 2010 05 18 18 49 55 31.3200 -97.3300 251.000 30.0 154.896 3.660 -999.990 -999.990 1.549 ..P WKT 2010 05 18 18 54 55 31.3200 -97.3300 251.000 122.0 142.385 3.500 -999.990 -999.990 1.424 ..P WKT 2010 05 18 18 59 55 31.3200 -97.3300 251.000 457.0 140.427 5.710 -999.990 -999.990 1.404 ..P WKT 2010 05 18 19 04 55 31.3200 -97.3300 251.000 30.0 141.801 7.380 -999.990 -999.990 1.418 ..P WKT 2010 05 18 19 09 55 31.3200 -97.3300 251.000 122.0 140.955 6.610 -999.990 -999.990 1.410 ..P WKT 2010 05 18 19 14 55 31.3200 -97.3300 251.000 457.0 137.609 4.500 -999.990 -999.990 1.376 ..P WKT 2010 05 18 19 24 55 31.3200 -97.3300 251.000 30.0 150.135 5.260 -999.990 -999.990 1.501 ..P WKT 2010 05 18 19 29 55 31.3200 -97.3300 251.000 122.0 140.603 6.400 -999.990 -999.990 1.406 ..P WKT 2010 05 18 19 34 55 31.3200 -97.3300 251.000 457.0 140.788 7.500 -999.990 -999.990 1.408 ..P WKT 2010 05 18 19 39 55 31.3200 -97.3300 251.000 30.0 144.720 5.650 -999.990 -999.990 1.447 ..P WKT 2010 05 18 19 44 55 31.3200 -97.3300 251.000 122.0 148.512 5.250 -999.990 -999.990 1.485 ..P WKT 2010 05 18 19 49 55 31.3200 -97.3300 251.000 457.0 142.451 3.380 -999.990 -999.990 1.425 ..P WKT 2010 05 18 19 59 55 31.3200 -97.3300 251.000 30.0 137.072 3.730 -999.990 -999.990 1.371 ..P WKT 2010 05 18 20 04 55 31.3200 -97.3300 251.000 122.0 145.800 3.930 -999.990 -999.990 1.458 ..P WKT 2010 05 18 20 09 55 31.3200 -97.3300 251.000 457.0 138.433 4.730 -999.990 -999.990 1.384 ..P WKT 2010 05 18 20 14 55 31.3200 -97.3300 251.000 30.0 132.176 4.870 -999.990 -999.990 1.322 ..P WKT 2010 05 18 20 19 55 31.3200 -97.3300 251.000 122.0 136.741 4.720 -999.990 -999.990 1.367 ..P WKT 2010 05 18 20 24 55 31.3200 -97.3300 251.000 457.0 131.317 4.250 -999.990 -999.990 1.313 ..P WKT 2010 05 18 20 34 55 31.3200 -97.3300 251.000 30.0 139.891 4.180 -999.990 -999.990 1.399 ..P WKT 2010 05 18 20 39 55 31.3200 -97.3300 251.000 122.0 138.352 4.540 -999.990 -999.990 1.384 ..P WKT 2010 05 18 20 44 55 31.3200 -97.3300 251.000 457.0 132.236 4.900 -999.990 -999.990 1.322 ..P WKT 2010 05 18 20 49 55 31.3200 -97.3300 251.000 30.0 142.486 5.430 -999.990 -999.990 1.425 ..P WKT 2010 05 18 20 54 55 31.3200 -97.3300 251.000 122.0 145.939 4.310 -999.990 -999.990 1.459 ..P WKT 2010 05 18 20 59 55 31.3200 -97.3300 251.000 457.0 137.466 2.980 -999.990 -999.990 1.375 ..P WKT 2010 05 18 21 09 55 31.3200 -97.3300 251.000 30.0 134.904 3.030 -999.990 -999.990 1.349 ..P WKT 2010 05 18 21 14 55 31.3200 -97.3300 251.000 122.0 144.418 4.150 -999.990 -999.990 1.444 ..P WKT 2010 05 18 21 19 55 31.3200 -97.3300 251.000 457.0 140.067 6.090 -999.990 -999.990 1.401 ..P WKT 2010 05 18 21 24 55 31.3200 -97.3300 251.000 30.0 132.666 3.700 -999.990 -999.990 1.327 ..P WKT 2010 05 18 21 29 55 31.3200 -97.3300 251.000 122.0 142.456 2.460 -999.990 -999.990 1.425 ..P WKT 2010 05 18 21 34 55 31.3200 -97.3300 251.000 457.0 136.996 2.400 -999.990 -999.990 1.370 ..P WKT 2010 05 18 21 44 55 31.3200 -97.3300 251.000 30.0 136.296 3.700 -999.990 -999.990 1.363 ..P WKT 2010 05 18 21 49 55 31.3200 -97.3300 251.000 122.0 142.164 3.340 -999.990 -999.990 1.422 ..P WKT 2010 05 18 21 54 55 31.3200 -97.3300 251.000 457.0 136.942 2.470 -999.990 -999.990 1.369 ..P WKT 2010 05 18 21 59 55 31.3200 -97.3300 251.000 30.0 132.554 3.660 -999.990 -999.990 1.326 ..P WKT 2010 05 18 22 04 55 31.3200 -97.3300 251.000 122.0 139.806 3.040 -999.990 -999.990 1.398 ..P WKT 2010 05 18 22 09 55 31.3200 -97.3300 251.000 457.0 133.201 2.810 -999.990 -999.990 1.332 ..P WKT 2010 05 18 22 19 55 31.3200 -97.3300 251.000 30.0 148.296 2.780 -999.990 -999.990 1.483 ..P WKT 2010 05 18 22 24 55 31.3200 -97.3300 251.000 122.0 144.225 2.880 -999.990 -999.990 1.442 ..P WKT 2010 05 18 22 29 55 31.3200 -97.3300 251.000 457.0 143.479 4.670 -999.990 -999.990 1.435 ..P WKT 2010 05 18 22 34 55 31.3200 -97.3300 251.000 30.0 148.828 6.330 -999.990 -999.990 1.488 ..P WKT 2010 05 18 22 39 55 31.3200 -97.3300 251.000 122.0 150.852 5.070 -999.990 -999.990 1.509 ..P WKT 2010 05 18 22 44 55 31.3200 -97.3300 251.000 457.0 144.843 3.830 -999.990 -999.990 1.448 ..P WKT 2010 05 18 22 54 55 31.3200 -97.3300 251.000 30.0 143.648 3.520 -999.990 -999.990 1.436 ..P WKT 2010 05 18 22 59 55 31.3200 -97.3300 251.000 122.0 145.691 4.800 -999.990 -999.990 1.457 ..P WKT 2010 05 18 23 04 55 31.3200 -97.3300 251.000 457.0 144.273 5.970 -999.990 -999.990 1.443 ..P WKT 2010 05 18 23 09 55 31.3200 -97.3300 251.000 30.0 140.085 5.210 -999.990 -999.990 1.401 ..P WKT 2010 05 18 23 14 55 31.3200 -97.3300 251.000 122.0 143.513 2.430 -999.990 -999.990 1.435 ..P WKT 2010 05 18 23 19 55 31.3200 -97.3300 251.000 457.0 139.741 2.930 -999.990 -999.990 1.397 ..P WKT 2010 05 18 23 29 55 31.3200 -97.3300 251.000 30.0 135.595 3.400 -999.990 -999.990 1.356 ..P WKT 2010 05 18 23 34 55 31.3200 -97.3300 251.000 122.0 146.712 2.820 -999.990 -999.990 1.467 ..P WKT 2010 05 18 23 39 55 31.3200 -97.3300 251.000 457.0 139.831 3.240 -999.990 -999.990 1.398 ..P WKT 2010 05 18 23 44 55 31.3200 -97.3300 251.000 30.0 136.549 5.530 -999.990 -999.990 1.365 ..P WKT 2010 05 18 23 49 55 31.3200 -97.3300 251.000 122.0 148.910 6.430 -999.990 -999.990 1.489 ..P WKT 2010 05 19 00 09 55 31.3200 -97.3300 251.000 457.0 142.181 3.410 -999.990 -999.990 1.422 ..P WKT 2010 05 19 00 10 25 31.3200 -97.3300 251.000 457.0 145.680 3.230 -999.990 -999.990 1.457 ..P WKT 2010 05 19 00 10 55 31.3200 -97.3300 251.000 457.0 144.748 3.590 -999.990 -999.990 1.447 ..P WKT 2010 05 19 00 11 25 31.3200 -97.3300 251.000 457.0 152.540 3.920 -999.990 -999.990 1.525 ..P WKT 2010 05 19 00 11 55 31.3200 -97.3300 251.000 457.0 154.792 3.300 -999.990 -999.990 1.548 ..P WKT 2010 05 19 00 12 25 31.3200 -97.3300 251.000 457.0 150.398 3.680 -999.990 -999.990 1.504 ..P WKT 2010 05 19 00 12 55 31.3200 -97.3300 251.000 457.0 148.359 3.660 -999.990 -999.990 1.484 ..P WKT 2010 05 19 00 13 25 31.3200 -97.3300 251.000 457.0 155.874 4.290 -999.990 -999.990 1.559 ..P WKT 2010 05 19 00 13 55 31.3200 -97.3300 251.000 457.0 155.772 3.910 -999.990 -999.990 1.558 ..P WKT 2010 05 19 00 14 25 31.3200 -97.3300 251.000 457.0 152.902 3.970 -999.990 -999.990 1.529 ..P WKT 2010 05 19 00 14 55 31.3200 -97.3300 251.000 457.0 147.677 4.000 -999.990 -999.990 1.477 ..P WKT 2010 05 19 00 19 55 31.3200 -97.3300 251.000 30.0 156.360 6.450 -999.990 -999.990 1.564 ..P WKT 2010 05 19 00 24 55 31.3200 -97.3300 251.000 122.0 160.614 5.390 -999.990 -999.990 1.606 ..P WKT 2010 05 19 00 29 55 31.3200 -97.3300 251.000 457.0 155.586 5.990 -999.990 -999.990 1.556 ..P WKT 2010 05 19 00 34 55 31.3200 -97.3300 251.000 30.0 157.207 5.770 -999.990 -999.990 1.572 ..P WKT 2010 05 19 00 39 55 31.3200 -97.3300 251.000 122.0 157.027 4.620 -999.990 -999.990 1.570 ..P WKT 2010 05 19 00 44 55 31.3200 -97.3300 251.000 457.0 161.422 3.570 -999.990 -999.990 1.614 ..P WKT 2010 05 19 00 54 55 31.3200 -97.3300 251.000 30.0 155.822 3.460 -999.990 -999.990 1.558 ..P WKT 2010 05 19 00 59 55 31.3200 -97.3300 251.000 122.0 165.376 5.360 -999.990 -999.990 1.654 ..P WKT 2010 05 19 01 04 55 31.3200 -97.3300 251.000 457.0 156.762 6.110 -999.990 -999.990 1.568 ..P WKT 2010 05 19 01 09 55 31.3200 -97.3300 251.000 30.0 161.742 4.810 -999.990 -999.990 1.617 ..P WKT 2010 05 19 01 14 55 31.3200 -97.3300 251.000 122.0 158.121 4.000 -999.990 -999.990 1.581 ..P WKT 2010 05 19 01 19 55 31.3200 -97.3300 251.000 457.0 159.216 3.190 -999.990 -999.990 1.592 ..P WKT 2010 05 19 01 29 55 31.3200 -97.3300 251.000 30.0 157.066 3.010 -999.990 -999.990 1.571 ..P WKT 2010 05 19 01 34 55 31.3200 -97.3300 251.000 122.0 157.150 2.300 -999.990 -999.990 1.572 ..P WKT 2010 05 19 01 39 55 31.3200 -97.3300 251.000 457.0 151.957 4.830 -999.990 -999.990 1.520 ..P WKT 2010 05 19 01 44 55 31.3200 -97.3300 251.000 30.0 150.652 4.240 -999.990 -999.990 1.507 ..P WKT 2010 05 19 01 49 55 31.3200 -97.3300 251.000 122.0 150.180 3.770 -999.990 -999.990 1.502 ..P WKT 2010 05 19 01 54 55 31.3200 -97.3300 251.000 457.0 153.042 2.910 -999.990 -999.990 1.530 ..P WKT 2010 05 19 02 04 55 31.3200 -97.3300 251.000 30.0 151.860 3.280 -999.990 -999.990 1.519 ..P WKT 2010 05 19 02 09 55 31.3200 -97.3300 251.000 122.0 156.710 3.850 -999.990 -999.990 1.567 ..P WKT 2010 05 19 02 14 55 31.3200 -97.3300 251.000 457.0 152.664 4.460 -999.990 -999.990 1.527 ..P WKT 2010 05 19 02 19 55 31.3200 -97.3300 251.000 30.0 150.284 3.560 -999.990 -999.990 1.503 ..P WKT 2010 05 19 02 24 55 31.3200 -97.3300 251.000 122.0 148.460 2.940 -999.990 -999.990 1.485 ..P WKT 2010 05 19 02 29 55 31.3200 -97.3300 251.000 457.0 153.035 2.870 -999.990 -999.990 1.530 ..P WKT 2010 05 19 02 39 55 31.3200 -97.3300 251.000 30.0 162.069 2.290 -999.990 -999.990 1.621 ..P WKT 2010 05 19 02 44 55 31.3200 -97.3300 251.000 122.0 150.106 2.890 -999.990 -999.990 1.501 ..P WKT 2010 05 19 02 49 55 31.3200 -97.3300 251.000 457.0 148.718 2.890 -999.990 -999.990 1.487 ..P WKT 2010 05 19 02 54 55 31.3200 -97.3300 251.000 30.0 150.671 2.810 -999.990 -999.990 1.507 ..P WKT 2010 05 19 02 59 55 31.3200 -97.3300 251.000 122.0 149.840 2.830 -999.990 -999.990 1.498 ..P WKT 2010 05 19 03 04 55 31.3200 -97.3300 251.000 457.0 152.908 4.250 -999.990 -999.990 1.529 ..P WKT 2010 05 19 03 14 55 31.3200 -97.3300 251.000 30.0 149.812 3.750 -999.990 -999.990 1.498 ..P WKT 2010 05 19 03 19 55 31.3200 -97.3300 251.000 122.0 149.497 3.220 -999.990 -999.990 1.495 ..P WKT 2010 05 19 03 24 55 31.3200 -97.3300 251.000 457.0 146.256 3.630 -999.990 -999.990 1.463 ..P WKT 2010 05 19 03 29 55 31.3200 -97.3300 251.000 30.0 146.359 3.490 -999.990 -999.990 1.464 ..P WKT 2010 05 19 03 34 55 31.3200 -97.3300 251.000 122.0 151.202 3.940 -999.990 -999.990 1.512 ..P WKT 2010 05 19 03 39 55 31.3200 -97.3300 251.000 457.0 131.784 4.200 -999.990 -999.990 1.318 ..P WKT 2010 05 19 03 49 55 31.3200 -97.3300 251.000 30.0 141.431 3.790 -999.990 -999.990 1.414 ..P WKT 2010 05 19 03 54 55 31.3200 -97.3300 251.000 122.0 148.608 2.980 -999.990 -999.990 1.486 ..P WKT 2010 05 19 03 59 55 31.3200 -97.3300 251.000 457.0 133.184 2.690 -999.990 -999.990 1.332 ..P WKT 2010 05 19 04 04 55 31.3200 -97.3300 251.000 30.0 150.968 3.200 -999.990 -999.990 1.510 ..P WKT 2010 05 19 04 09 55 31.3200 -97.3300 251.000 122.0 142.378 2.620 -999.990 -999.990 1.424 ..P WKT 2010 05 19 04 14 55 31.3200 -97.3300 251.000 457.0 132.250 2.540 -999.990 -999.990 1.323 ..P WKT 2010 05 19 04 24 55 31.3200 -97.3300 251.000 30.0 144.262 3.260 -999.990 -999.990 1.443 ..P WKT 2010 05 19 04 29 55 31.3200 -97.3300 251.000 122.0 145.741 2.770 -999.990 -999.990 1.457 ..P WKT 2010 05 19 04 34 55 31.3200 -97.3300 251.000 457.0 129.760 4.650 -999.990 -999.990 1.298 ..P WKT 2010 05 19 04 39 55 31.3200 -97.3300 251.000 30.0 148.283 2.690 -999.990 -999.990 1.483 ..P WKT 2010 05 19 04 44 55 31.3200 -97.3300 251.000 122.0 134.252 2.450 -999.990 -999.990 1.343 ..P WKT 2010 05 19 04 49 55 31.3200 -97.3300 251.000 457.0 129.023 4.660 -999.990 -999.990 1.290 ..P WKT 2010 05 19 05 04 55 31.3200 -97.3300 251.000 30.0 147.983 3.040 -999.990 -999.990 1.480 ..P WKT 2010 05 19 05 09 55 31.3200 -97.3300 251.000 122.0 142.811 4.310 -999.990 -999.990 1.428 ..P WKT 2010 05 19 05 14 55 31.3200 -97.3300 251.000 457.0 134.281 3.590 -999.990 -999.990 1.343 ..P WKT 2010 05 19 05 19 55 31.3200 -97.3300 251.000 30.0 154.289 4.310 -999.990 -999.990 1.543 ..P WKT 2010 05 19 05 24 55 31.3200 -97.3300 251.000 122.0 137.922 4.300 -999.990 -999.990 1.379 ..P WKT 2010 05 19 05 29 55 31.3200 -97.3300 251.000 457.0 134.705 4.950 -999.990 -999.990 1.347 ..P WKT 2010 05 19 05 39 55 31.3200 -97.3300 251.000 30.0 148.728 5.130 -999.990 -999.990 1.487 ..P WKT 2010 05 19 05 44 55 31.3200 -97.3300 251.000 122.0 141.891 4.550 -999.990 -999.990 1.419 ..P WKT 2010 05 19 05 49 55 31.3200 -97.3300 251.000 457.0 150.457 4.700 -999.990 -999.990 1.505 ..P WKT 2010 05 19 05 54 55 31.3200 -97.3300 251.000 30.0 148.100 3.930 -999.990 -999.990 1.481 ..P WKT 2010 05 19 05 59 55 31.3200 -97.3300 251.000 122.0 137.336 4.540 -999.990 -999.990 1.373 ..P WKT 2010 05 19 06 04 55 31.3200 -97.3300 251.000 457.0 160.477 8.310 -999.990 -999.990 1.605 ..P WKT 2010 05 19 06 14 55 31.3200 -97.3300 251.000 30.0 145.592 3.200 -999.990 -999.990 1.456 ..P WKT 2010 05 19 06 19 55 31.3200 -97.3300 251.000 122.0 147.077 2.900 -999.990 -999.990 1.471 ..P WKT 2010 05 19 06 24 55 31.3200 -97.3300 251.000 457.0 148.002 2.930 -999.990 -999.990 1.480 ..P WKT 2010 05 19 06 29 55 31.3200 -97.3300 251.000 30.0 155.659 3.350 -999.990 -999.990 1.557 ..P WKT 2010 05 19 06 34 55 31.3200 -97.3300 251.000 122.0 143.120 3.420 -999.990 -999.990 1.431 ..P WKT 2010 05 19 06 39 55 31.3200 -97.3300 251.000 457.0 142.082 3.180 -999.990 -999.990 1.421 ..P WKT 2010 05 19 06 49 55 31.3200 -97.3300 251.000 30.0 147.981 4.400 -999.990 -999.990 1.480 ..P WKT 2010 05 19 06 54 55 31.3200 -97.3300 251.000 122.0 142.571 2.860 -999.990 -999.990 1.426 ..P WKT 2010 05 19 06 59 55 31.3200 -97.3300 251.000 457.0 191.203 3.340 -999.990 -999.990 1.912 ..P WKT 2010 05 19 07 04 55 31.3200 -97.3300 251.000 30.0 152.665 3.270 -999.990 -999.990 1.527 ..P WKT 2010 05 19 07 09 55 31.3200 -97.3300 251.000 122.0 137.845 3.130 -999.990 -999.990 1.378 ..P WKT 2010 05 19 07 14 55 31.3200 -97.3300 251.000 457.0 148.300 3.100 -999.990 -999.990 1.483 ..P WKT 2010 05 19 07 24 55 31.3200 -97.3300 251.000 30.0 145.217 3.270 -999.990 -999.990 1.452 ..P WKT 2010 05 19 07 29 55 31.3200 -97.3300 251.000 122.0 134.481 4.020 -999.990 -999.990 1.345 ..P WKT 2010 05 19 07 34 55 31.3200 -97.3300 251.000 457.0 129.644 3.170 -999.990 -999.990 1.296 ..P WKT 2010 05 19 07 39 55 31.3200 -97.3300 251.000 30.0 143.640 3.450 -999.990 -999.990 1.436 ..P WKT 2010 05 19 07 44 55 31.3200 -97.3300 251.000 122.0 141.333 7.280 -999.990 -999.990 1.413 ..P WKT 2010 05 19 07 49 55 31.3200 -97.3300 251.000 457.0 131.011 3.470 -999.990 -999.990 1.310 ..P WKT 2010 05 19 07 59 55 31.3200 -97.3300 251.000 30.0 147.289 4.350 -999.990 -999.990 1.473 ..P WKT 2010 05 19 08 04 55 31.3200 -97.3300 251.000 122.0 136.481 3.010 -999.990 -999.990 1.365 ..P WKT 2010 05 19 08 09 55 31.3200 -97.3300 251.000 457.0 139.035 3.240 -999.990 -999.990 1.390 ..P WKT 2010 05 19 08 14 55 31.3200 -97.3300 251.000 30.0 135.539 3.740 -999.990 -999.990 1.355 ..P WKT 2010 05 19 08 19 55 31.3200 -97.3300 251.000 122.0 133.450 3.180 -999.990 -999.990 1.335 ..P WKT 2010 05 19 08 24 55 31.3200 -97.3300 251.000 457.0 131.078 3.780 -999.990 -999.990 1.311 ..P WKT 2010 05 19 08 34 55 31.3200 -97.3300 251.000 30.0 138.141 3.640 -999.990 -999.990 1.381 ..P WKT 2010 05 19 08 39 55 31.3200 -97.3300 251.000 122.0 135.889 3.550 -999.990 -999.990 1.359 ..P WKT 2010 05 19 08 44 55 31.3200 -97.3300 251.000 457.0 132.088 3.340 -999.990 -999.990 1.321 ..P WKT 2010 05 19 08 49 55 31.3200 -97.3300 251.000 30.0 136.738 3.790 -999.990 -999.990 1.367 ..P WKT 2010 05 19 08 54 55 31.3200 -97.3300 251.000 122.0 145.055 5.340 -999.990 -999.990 1.451 ..P WKT 2010 05 19 08 59 55 31.3200 -97.3300 251.000 457.0 131.245 3.140 -999.990 -999.990 1.312 ..P WKT 2010 05 19 09 09 55 31.3200 -97.3300 251.000 30.0 143.009 5.200 -999.990 -999.990 1.430 ..P WKT 2010 05 19 09 14 55 31.3200 -97.3300 251.000 122.0 144.060 4.020 -999.990 -999.990 1.441 ..P WKT 2010 05 19 09 19 55 31.3200 -97.3300 251.000 457.0 125.648 3.330 -999.990 -999.990 1.256 ..P WKT 2010 05 19 09 24 55 31.3200 -97.3300 251.000 30.0 151.522 3.520 -999.990 -999.990 1.515 ..P WKT 2010 05 19 09 29 55 31.3200 -97.3300 251.000 122.0 141.006 3.590 -999.990 -999.990 1.410 ..P WKT 2010 05 19 09 34 55 31.3200 -97.3300 251.000 457.0 121.738 3.110 -999.990 -999.990 1.217 ..P WKT 2010 05 19 09 44 55 31.3200 -97.3300 251.000 30.0 136.537 2.890 -999.990 -999.990 1.365 ..P WKT 2010 05 19 09 49 55 31.3200 -97.3300 251.000 122.0 140.693 4.230 -999.990 -999.990 1.407 ..P WKT 2010 05 19 09 54 55 31.3200 -97.3300 251.000 457.0 118.024 3.250 -999.990 -999.990 1.180 ..P WKT 2010 05 19 09 59 55 31.3200 -97.3300 251.000 30.0 140.254 4.140 -999.990 -999.990 1.403 ..P WKT 2010 05 19 10 04 55 31.3200 -97.3300 251.000 122.0 141.024 3.730 -999.990 -999.990 1.410 ..P WKT 2010 05 19 10 09 55 31.3200 -97.3300 251.000 457.0 113.540 3.310 -999.990 -999.990 1.135 ..P WKT 2010 05 19 10 19 55 31.3200 -97.3300 251.000 30.0 140.062 3.800 -999.990 -999.990 1.401 ..P WKT 2010 05 19 10 24 55 31.3200 -97.3300 251.000 122.0 140.105 3.590 -999.990 -999.990 1.401 ..P WKT 2010 05 19 10 29 55 31.3200 -97.3300 251.000 457.0 121.488 3.680 -999.990 -999.990 1.215 ..P WKT 2010 05 19 10 34 55 31.3200 -97.3300 251.000 30.0 133.970 3.420 -999.990 -999.990 1.340 ..P WKT 2010 05 19 10 39 55 31.3200 -97.3300 251.000 122.0 140.799 3.640 -999.990 -999.990 1.408 ..P WKT 2010 05 19 10 44 55 31.3200 -97.3300 251.000 457.0 111.708 3.330 -999.990 -999.990 1.117 ..P WKT 2010 05 19 10 54 55 31.3200 -97.3300 251.000 30.0 139.776 4.060 -999.990 -999.990 1.398 ..P WKT 2010 05 19 10 59 55 31.3200 -97.3300 251.000 122.0 143.903 4.090 -999.990 -999.990 1.439 ..P WKT 2010 05 19 11 04 55 31.3200 -97.3300 251.000 457.0 109.111 3.450 -999.990 -999.990 1.091 ..P WKT 2010 05 19 11 09 55 31.3200 -97.3300 251.000 30.0 132.484 3.720 -999.990 -999.990 1.325 ..P WKT 2010 05 19 11 14 55 31.3200 -97.3300 251.000 122.0 144.256 3.810 -999.990 -999.990 1.443 ..P WKT 2010 05 19 11 19 55 31.3200 -97.3300 251.000 457.0 110.721 3.920 -999.990 -999.990 1.107 ..P WKT 2010 05 19 11 29 55 31.3200 -97.3300 251.000 30.0 139.047 3.840 -999.990 -999.990 1.390 ..P WKT 2010 05 19 11 34 55 31.3200 -97.3300 251.000 122.0 140.024 3.950 -999.990 -999.990 1.400 ..P WKT 2010 05 19 11 39 55 31.3200 -97.3300 251.000 457.0 120.313 4.570 -999.990 -999.990 1.203 ..P WKT 2010 05 19 11 44 55 31.3200 -97.3300 251.000 30.0 136.592 4.790 -999.990 -999.990 1.366 ..P WKT 2010 05 19 11 49 55 31.3200 -97.3300 251.000 122.0 140.261 4.540 -999.990 -999.990 1.403 ..P WKT 2010 05 19 12 09 55 31.3200 -97.3300 251.000 457.0 109.504 3.640 -999.990 -999.990 1.095 ..P WKT 2010 05 19 12 10 25 31.3200 -97.3300 251.000 457.0 109.532 4.280 -999.990 -999.990 1.095 ..P WKT 2010 05 19 12 10 55 31.3200 -97.3300 251.000 457.0 112.963 3.980 -999.990 -999.990 1.130 ..P WKT 2010 05 19 12 11 25 31.3200 -97.3300 251.000 457.0 110.722 3.690 -999.990 -999.990 1.107 ..P WKT 2010 05 19 12 11 55 31.3200 -97.3300 251.000 457.0 115.003 3.770 -999.990 -999.990 1.150 ..P WKT 2010 05 19 12 12 25 31.3200 -97.3300 251.000 457.0 114.181 3.690 -999.990 -999.990 1.142 ..P WKT 2010 05 19 12 12 55 31.3200 -97.3300 251.000 457.0 113.783 4.000 -999.990 -999.990 1.138 ..P WKT 2010 05 19 12 13 25 31.3200 -97.3300 251.000 457.0 112.961 5.050 -999.990 -999.990 1.130 ..P WKT 2010 05 19 12 13 55 31.3200 -97.3300 251.000 457.0 111.429 4.540 -999.990 -999.990 1.114 ..P WKT 2010 05 19 12 14 25 31.3200 -97.3300 251.000 457.0 110.748 3.970 -999.990 -999.990 1.107 ..P WKT 2010 05 19 12 14 55 31.3200 -97.3300 251.000 457.0 110.209 3.960 -999.990 -999.990 1.102 ..P WKT 2010 05 19 12 19 55 31.3200 -97.3300 251.000 30.0 130.057 4.370 -999.990 -999.990 1.301 ..P WKT 2010 05 19 12 24 55 31.3200 -97.3300 251.000 122.0 136.436 4.770 -999.990 -999.990 1.364 ..P WKT 2010 05 19 12 29 55 31.3200 -97.3300 251.000 457.0 108.496 5.050 -999.990 -999.990 1.085 ..P WKT 2010 05 19 12 34 55 31.3200 -97.3300 251.000 30.0 135.722 4.390 -999.990 -999.990 1.357 ..P WKT 2010 05 19 12 39 55 31.3200 -97.3300 251.000 122.0 132.314 3.500 -999.990 -999.990 1.323 ..P WKT 2010 05 19 12 44 55 31.3200 -97.3300 251.000 457.0 111.037 5.440 -999.990 -999.990 1.110 ..P WKT 2010 05 19 12 54 55 31.3200 -97.3300 251.000 30.0 134.344 4.130 -999.990 -999.990 1.343 ..P WKT 2010 05 19 12 59 55 31.3200 -97.3300 251.000 122.0 143.613 3.660 -999.990 -999.990 1.436 ..P WKT 2010 05 19 13 04 55 31.3200 -97.3300 251.000 457.0 109.474 3.880 -999.990 -999.990 1.095 ..P WKT 2010 05 19 13 09 55 31.3200 -97.3300 251.000 30.0 139.456 4.380 -999.990 -999.990 1.395 ..P WKT 2010 05 19 13 14 55 31.3200 -97.3300 251.000 122.0 147.308 3.900 -999.990 -999.990 1.473 ..P WKT 2010 05 19 13 19 55 31.3200 -97.3300 251.000 457.0 118.272 3.850 -999.990 -999.990 1.183 ..P WKT 2010 05 19 13 29 55 31.3200 -97.3300 251.000 30.0 141.964 5.060 -999.990 -999.990 1.420 ..P WKT 2010 05 19 13 34 55 31.3200 -97.3300 251.000 122.0 138.222 5.200 -999.990 -999.990 1.382 ..P WKT 2010 05 19 13 39 55 31.3200 -97.3300 251.000 457.0 113.478 4.200 -999.990 -999.990 1.135 ..P WKT 2010 05 19 13 44 55 31.3200 -97.3300 251.000 30.0 137.550 5.900 -999.990 -999.990 1.376 ..P WKT 2010 05 19 13 49 55 31.3200 -97.3300 251.000 122.0 131.537 4.480 -999.990 -999.990 1.315 ..P WKT 2010 05 19 13 54 55 31.3200 -97.3300 251.000 457.0 122.970 4.900 -999.990 -999.990 1.230 ..P WKT 2010 05 19 14 04 55 31.3200 -97.3300 251.000 30.0 134.909 3.470 -999.990 -999.990 1.349 ..P WKT 2010 05 19 14 09 55 31.3200 -97.3300 251.000 122.0 136.681 4.600 -999.990 -999.990 1.367 ..P WKT 2010 05 19 14 14 55 31.3200 -97.3300 251.000 457.0 124.543 4.980 -999.990 -999.990 1.245 ..P WKT 2010 05 19 14 19 55 31.3200 -97.3300 251.000 30.0 135.969 6.260 -999.990 -999.990 1.360 ..P WKT 2010 05 19 14 24 55 31.3200 -97.3300 251.000 122.0 136.606 5.080 -999.990 -999.990 1.366 ..P WKT 2010 05 19 14 29 55 31.3200 -97.3300 251.000 457.0 131.848 3.940 -999.990 -999.990 1.318 ..P WKT 2010 05 19 14 39 55 31.3200 -97.3300 251.000 30.0 132.109 3.730 -999.990 -999.990 1.321 ..P WKT 2010 05 19 14 44 55 31.3200 -97.3300 251.000 122.0 133.436 5.890 -999.990 -999.990 1.334 ..P WKT 2010 05 19 14 49 55 31.3200 -97.3300 251.000 457.0 124.964 5.930 -999.990 -999.990 1.250 ..P WKT 2010 05 19 14 54 55 31.3200 -97.3300 251.000 30.0 131.546 4.640 -999.990 -999.990 1.315 ..P WKT 2010 05 19 14 59 55 31.3200 -97.3300 251.000 122.0 132.020 4.090 -999.990 -999.990 1.320 ..P WKT 2010 05 19 15 04 55 31.3200 -97.3300 251.000 457.0 126.673 3.890 -999.990 -999.990 1.267 ..P WKT 2010 05 19 15 14 55 31.3200 -97.3300 251.000 30.0 123.990 3.640 -999.990 -999.990 1.240 ..P WKT 2010 05 19 15 19 55 31.3200 -97.3300 251.000 122.0 130.492 3.930 -999.990 -999.990 1.305 ..P WKT 2010 05 19 15 24 55 31.3200 -97.3300 251.000 457.0 128.613 3.530 -999.990 -999.990 1.286 ..P WKT 2010 05 19 15 29 55 31.3200 -97.3300 251.000 30.0 127.728 4.260 -999.990 -999.990 1.277 ..P WKT 2010 05 19 15 34 55 31.3200 -97.3300 251.000 122.0 128.691 3.390 -999.990 -999.990 1.287 ..P WKT 2010 05 19 15 39 55 31.3200 -97.3300 251.000 457.0 124.681 3.390 -999.990 -999.990 1.247 ..P WKT 2010 05 19 15 49 55 31.3200 -97.3300 251.000 30.0 126.767 3.200 -999.990 -999.990 1.268 ..P WKT 2010 05 19 15 54 55 31.3200 -97.3300 251.000 122.0 125.192 3.330 -999.990 -999.990 1.252 ..P WKT 2010 05 19 15 59 55 31.3200 -97.3300 251.000 457.0 115.092 3.960 -999.990 -999.990 1.151 ..P WKT 2010 05 19 16 04 55 31.3200 -97.3300 251.000 30.0 122.183 3.850 -999.990 -999.990 1.222 ..P WKT 2010 05 19 16 09 55 31.3200 -97.3300 251.000 122.0 118.193 3.450 -999.990 -999.990 1.182 ..P WKT 2010 05 19 16 14 55 31.3200 -97.3300 251.000 457.0 119.033 2.890 -999.990 -999.990 1.190 ..P WKT 2010 05 19 16 24 55 31.3200 -97.3300 251.000 30.0 123.373 4.510 -999.990 -999.990 1.234 ..P WKT 2010 05 19 16 29 55 31.3200 -97.3300 251.000 122.0 119.483 3.640 -999.990 -999.990 1.195 ..P WKT 2010 05 19 16 34 55 31.3200 -97.3300 251.000 457.0 126.394 4.030 -999.990 -999.990 1.264 ..P WKT 2010 05 19 16 39 55 31.3200 -97.3300 251.000 30.0 121.509 3.690 -999.990 -999.990 1.215 ..P WKT 2010 05 19 16 44 55 31.3200 -97.3300 251.000 122.0 130.553 3.210 -999.990 -999.990 1.306 ..P WKT 2010 05 19 16 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 19 17 04 55 31.3200 -97.3300 251.000 30.0 130.292 3.390 -999.990 -999.990 1.303 ..P WKT 2010 05 19 17 09 55 31.3200 -97.3300 251.000 122.0 138.602 4.920 -999.990 -999.990 1.386 ..P WKT 2010 05 19 17 14 55 31.3200 -97.3300 251.000 457.0 130.705 6.460 -999.990 -999.990 1.307 ..P WKT 2010 05 19 17 19 55 31.3200 -97.3300 251.000 30.0 129.631 5.940 -999.990 -999.990 1.296 ..P WKT 2010 05 19 17 24 55 31.3200 -97.3300 251.000 122.0 136.237 5.120 -999.990 -999.990 1.362 ..P WKT 2010 05 19 17 29 55 31.3200 -97.3300 251.000 457.0 135.448 3.730 -999.990 -999.990 1.354 ..P WKT 2010 05 19 17 39 55 31.3200 -97.3300 251.000 30.0 131.884 3.860 -999.990 -999.990 1.319 ..P WKT 2010 05 19 17 44 55 31.3200 -97.3300 251.000 122.0 130.532 6.950 -999.990 -999.990 1.305 ..P WKT 2010 05 19 17 49 55 31.3200 -97.3300 251.000 457.0 127.757 6.000 -999.990 -999.990 1.278 ..P WKT 2010 05 19 17 54 55 31.3200 -97.3300 251.000 30.0 130.955 6.330 -999.990 -999.990 1.310 ..P WKT 2010 05 19 17 59 55 31.3200 -97.3300 251.000 122.0 132.162 5.950 -999.990 -999.990 1.322 ..P WKT 2010 05 19 18 04 55 31.3200 -97.3300 251.000 457.0 123.697 3.560 -999.990 -999.990 1.237 ..P WKT 2010 05 19 18 14 55 31.3200 -97.3300 251.000 30.0 127.310 4.040 -999.990 -999.990 1.273 ..P WKT 2010 05 19 18 19 55 31.3200 -97.3300 251.000 122.0 126.587 6.250 -999.990 -999.990 1.266 ..P WKT 2010 05 19 18 24 55 31.3200 -97.3300 251.000 457.0 126.148 6.790 -999.990 -999.990 1.261 ..P WKT 2010 05 19 18 29 55 31.3200 -97.3300 251.000 30.0 128.555 5.540 -999.990 -999.990 1.286 ..P WKT 2010 05 19 18 34 55 31.3200 -97.3300 251.000 122.0 131.246 5.360 -999.990 -999.990 1.312 ..P WKT 2010 05 19 18 39 55 31.3200 -97.3300 251.000 457.0 126.823 3.210 -999.990 -999.990 1.268 ..P WKT 2010 05 19 18 49 55 31.3200 -97.3300 251.000 30.0 133.040 3.010 -999.990 -999.990 1.330 ..P WKT 2010 05 19 18 54 55 31.3200 -97.3300 251.000 122.0 131.869 4.630 -999.990 -999.990 1.319 ..P WKT 2010 05 19 18 59 55 31.3200 -97.3300 251.000 457.0 129.133 5.390 -999.990 -999.990 1.291 ..P WKT 2010 05 19 19 04 55 31.3200 -97.3300 251.000 30.0 122.127 3.930 -999.990 -999.990 1.221 ..P WKT 2010 05 19 19 09 55 31.3200 -97.3300 251.000 122.0 122.237 3.650 -999.990 -999.990 1.222 ..P WKT 2010 05 19 19 14 55 31.3200 -97.3300 251.000 457.0 122.204 3.950 -999.990 -999.990 1.222 ..P WKT 2010 05 19 19 24 55 31.3200 -97.3300 251.000 30.0 119.984 4.400 -999.990 -999.990 1.200 ..P WKT 2010 05 19 19 29 55 31.3200 -97.3300 251.000 122.0 129.325 3.940 -999.990 -999.990 1.293 ..P WKT 2010 05 19 19 34 55 31.3200 -97.3300 251.000 457.0 123.152 4.290 -999.990 -999.990 1.232 ..P WKT 2010 05 19 19 39 55 31.3200 -97.3300 251.000 30.0 125.946 4.290 -999.990 -999.990 1.259 ..P WKT 2010 05 19 19 44 55 31.3200 -97.3300 251.000 122.0 121.196 4.570 -999.990 -999.990 1.212 ..P WKT 2010 05 19 19 49 55 31.3200 -97.3300 251.000 457.0 123.847 4.300 -999.990 -999.990 1.238 ..P WKT 2010 05 19 19 59 55 31.3200 -97.3300 251.000 30.0 124.068 4.750 -999.990 -999.990 1.241 ..P WKT 2010 05 19 20 04 55 31.3200 -97.3300 251.000 122.0 126.191 5.290 -999.990 -999.990 1.262 ..P WKT 2010 05 19 20 09 55 31.3200 -97.3300 251.000 457.0 128.173 5.040 -999.990 -999.990 1.282 ..P WKT 2010 05 19 20 14 55 31.3200 -97.3300 251.000 30.0 129.015 4.940 -999.990 -999.990 1.290 ..P WKT 2010 05 19 20 19 55 31.3200 -97.3300 251.000 122.0 134.272 4.990 -999.990 -999.990 1.343 ..P WKT 2010 05 19 20 24 55 31.3200 -97.3300 251.000 457.0 125.288 5.000 -999.990 -999.990 1.253 ..P WKT 2010 05 19 20 34 55 31.3200 -97.3300 251.000 30.0 119.669 4.840 -999.990 -999.990 1.197 ..P WKT 2010 05 19 20 39 55 31.3200 -97.3300 251.000 122.0 122.321 4.600 -999.990 -999.990 1.223 ..P WKT 2010 05 19 20 44 55 31.3200 -97.3300 251.000 457.0 118.138 4.140 -999.990 -999.990 1.181 ..P WKT 2010 05 19 20 49 55 31.3200 -97.3300 251.000 30.0 115.379 4.430 -999.990 -999.990 1.154 ..P WKT 2010 05 19 20 54 55 31.3200 -97.3300 251.000 122.0 123.730 3.810 -999.990 -999.990 1.237 ..P WKT 2010 05 19 20 59 55 31.3200 -97.3300 251.000 457.0 119.261 2.890 -999.990 -999.990 1.193 ..P WKT 2010 05 19 21 09 55 31.3200 -97.3300 251.000 30.0 117.832 2.480 -999.990 -999.990 1.178 ..P WKT 2010 05 19 21 14 55 31.3200 -97.3300 251.000 122.0 114.889 3.770 -999.990 -999.990 1.149 ..P WKT 2010 05 19 21 19 55 31.3200 -97.3300 251.000 457.0 116.219 4.410 -999.990 -999.990 1.162 ..P WKT 2010 05 19 21 24 55 31.3200 -97.3300 251.000 30.0 117.550 3.980 -999.990 -999.990 1.175 ..P WKT 2010 05 19 21 29 55 31.3200 -97.3300 251.000 122.0 126.861 3.950 -999.990 -999.990 1.269 ..P WKT 2010 05 19 21 34 55 31.3200 -97.3300 251.000 457.0 121.922 3.030 -999.990 -999.990 1.219 ..P WKT 2010 05 19 21 44 55 31.3200 -97.3300 251.000 30.0 115.342 2.820 -999.990 -999.990 1.153 ..P WKT 2010 05 19 21 49 55 31.3200 -97.3300 251.000 122.0 121.397 2.300 -999.990 -999.990 1.214 ..P WKT 2010 05 19 21 54 55 31.3200 -97.3300 251.000 457.0 110.920 2.420 -999.990 -999.990 1.109 ..P WKT 2010 05 19 21 59 55 31.3200 -97.3300 251.000 30.0 119.255 3.080 -999.990 -999.990 1.193 ..P WKT 2010 05 19 22 04 55 31.3200 -97.3300 251.000 122.0 119.324 3.330 -999.990 -999.990 1.193 ..P WKT 2010 05 19 22 09 55 31.3200 -97.3300 251.000 457.0 120.248 4.700 -999.990 -999.990 1.202 ..P WKT 2010 05 19 22 19 55 31.3200 -97.3300 251.000 30.0 118.269 4.030 -999.990 -999.990 1.183 ..P WKT 2010 05 19 22 24 55 31.3200 -97.3300 251.000 122.0 121.637 4.070 -999.990 -999.990 1.216 ..P WKT 2010 05 19 22 29 55 31.3200 -97.3300 251.000 457.0 122.725 3.790 -999.990 -999.990 1.227 ..P WKT 2010 05 19 22 34 55 31.3200 -97.3300 251.000 30.0 122.102 5.210 -999.990 -999.990 1.221 ..P WKT 2010 05 19 22 39 55 31.3200 -97.3300 251.000 122.0 130.317 3.460 -999.990 -999.990 1.303 ..P WKT 2010 05 19 22 44 55 31.3200 -97.3300 251.000 457.0 122.994 3.120 -999.990 -999.990 1.230 ..P WKT 2010 05 19 22 54 55 31.3200 -97.3300 251.000 30.0 122.318 2.520 -999.990 -999.990 1.223 ..P WKT 2010 05 19 22 59 55 31.3200 -97.3300 251.000 122.0 125.686 3.690 -999.990 -999.990 1.257 ..P WKT 2010 05 19 23 04 55 31.3200 -97.3300 251.000 457.0 119.502 4.110 -999.990 -999.990 1.195 ..P WKT 2010 05 19 23 09 55 31.3200 -97.3300 251.000 30.0 120.875 3.240 -999.990 -999.990 1.209 ..P WKT 2010 05 19 23 14 55 31.3200 -97.3300 251.000 122.0 118.113 1.850 -999.990 -999.990 1.181 ..P WKT 2010 05 19 23 19 55 31.3200 -97.3300 251.000 457.0 119.058 1.800 -999.990 -999.990 1.191 ..P WKT 2010 05 19 23 29 55 31.3200 -97.3300 251.000 30.0 116.002 2.050 -999.990 -999.990 1.160 ..P WKT 2010 05 19 23 34 55 31.3200 -97.3300 251.000 122.0 126.265 2.460 -999.990 -999.990 1.263 ..P WKT 2010 05 19 23 39 55 31.3200 -97.3300 251.000 457.0 119.126 3.990 -999.990 -999.990 1.191 ..P WKT 2010 05 19 23 44 55 31.3200 -97.3300 251.000 30.0 112.557 6.130 -999.990 -999.990 1.126 ..P WKT 2010 05 19 23 49 55 31.3200 -97.3300 251.000 122.0 116.258 5.760 -999.990 -999.990 1.163 ..P WKT 2010 05 20 00 09 55 31.3200 -97.3300 251.000 457.0 113.738 3.700 -999.990 -999.990 1.137 ..P WKT 2010 05 20 00 10 25 31.3200 -97.3300 251.000 457.0 110.179 3.600 -999.990 -999.990 1.102 ..P WKT 2010 05 20 00 10 55 31.3200 -97.3300 251.000 457.0 116.883 4.240 -999.990 -999.990 1.169 ..P WKT 2010 05 20 00 11 25 31.3200 -97.3300 251.000 457.0 116.033 3.700 -999.990 -999.990 1.160 ..P WKT 2010 05 20 00 11 55 31.3200 -97.3300 251.000 457.0 119.031 3.270 -999.990 -999.990 1.190 ..P WKT 2010 05 20 00 12 25 31.3200 -97.3300 251.000 457.0 117.467 3.520 -999.990 -999.990 1.175 ..P WKT 2010 05 20 00 12 55 31.3200 -97.3300 251.000 457.0 117.187 3.570 -999.990 -999.990 1.172 ..P WKT 2010 05 20 00 13 25 31.3200 -97.3300 251.000 457.0 115.766 3.730 -999.990 -999.990 1.158 ..P WKT 2010 05 20 00 13 55 31.3200 -97.3300 251.000 457.0 116.341 4.060 -999.990 -999.990 1.163 ..P WKT 2010 05 20 00 14 25 31.3200 -97.3300 251.000 457.0 115.633 4.630 -999.990 -999.990 1.156 ..P WKT 2010 05 20 00 14 55 31.3200 -97.3300 251.000 457.0 115.210 4.230 -999.990 -999.990 1.152 ..P WKT 2010 05 20 00 19 55 31.3200 -97.3300 251.000 30.0 115.398 5.180 -999.990 -999.990 1.154 ..P WKT 2010 05 20 00 24 55 31.3200 -97.3300 251.000 122.0 126.126 5.750 -999.990 -999.990 1.261 ..P WKT 2010 05 20 00 29 55 31.3200 -97.3300 251.000 457.0 120.047 4.750 -999.990 -999.990 1.200 ..P WKT 2010 05 20 00 34 55 31.3200 -97.3300 251.000 30.0 119.379 4.660 -999.990 -999.990 1.194 ..P WKT 2010 05 20 00 39 55 31.3200 -97.3300 251.000 122.0 123.835 3.210 -999.990 -999.990 1.238 ..P WKT 2010 05 20 00 44 55 31.3200 -97.3300 251.000 457.0 120.891 3.350 -999.990 -999.990 1.209 ..P WKT 2010 05 20 00 54 55 31.3200 -97.3300 251.000 30.0 120.681 3.700 -999.990 -999.990 1.207 ..P WKT 2010 05 20 00 59 55 31.3200 -97.3300 251.000 122.0 123.838 4.400 -999.990 -999.990 1.238 ..P WKT 2010 05 20 01 04 55 31.3200 -97.3300 251.000 457.0 124.436 4.880 -999.990 -999.990 1.244 ..P WKT 2010 05 20 01 09 55 31.3200 -97.3300 251.000 30.0 124.181 3.180 -999.990 -999.990 1.242 ..P WKT 2010 05 20 01 14 55 31.3200 -97.3300 251.000 122.0 121.371 2.170 -999.990 -999.990 1.214 ..P WKT 2010 05 20 01 19 55 31.3200 -97.3300 251.000 457.0 116.010 1.980 -999.990 -999.990 1.160 ..P WKT 2010 05 20 01 29 55 31.3200 -97.3300 251.000 30.0 125.311 2.820 -999.990 -999.990 1.253 ..P WKT 2010 05 20 01 34 55 31.3200 -97.3300 251.000 122.0 123.518 2.210 -999.990 -999.990 1.235 ..P WKT 2010 05 20 01 39 55 31.3200 -97.3300 251.000 457.0 120.875 3.830 -999.990 -999.990 1.209 ..P WKT 2010 05 20 01 44 55 31.3200 -97.3300 251.000 30.0 119.934 3.210 -999.990 -999.990 1.199 ..P WKT 2010 05 20 01 49 55 31.3200 -97.3300 251.000 122.0 122.109 2.970 -999.990 -999.990 1.221 ..P WKT 2010 05 20 01 54 55 31.3200 -97.3300 251.000 457.0 116.921 2.210 -999.990 -999.990 1.169 ..P WKT 2010 05 20 02 04 55 31.3200 -97.3300 251.000 30.0 119.653 2.480 -999.990 -999.990 1.197 ..P WKT 2010 05 20 02 09 55 31.3200 -97.3300 251.000 122.0 125.583 2.750 -999.990 -999.990 1.256 ..P WKT 2010 05 20 02 14 55 31.3200 -97.3300 251.000 457.0 113.978 2.850 -999.990 -999.990 1.140 ..P WKT 2010 05 20 02 19 55 31.3200 -97.3300 251.000 30.0 121.037 2.940 -999.990 -999.990 1.210 ..P WKT 2010 05 20 02 24 55 31.3200 -97.3300 251.000 122.0 115.659 2.540 -999.990 -999.990 1.157 ..P WKT 2010 05 20 02 29 55 31.3200 -97.3300 251.000 457.0 109.436 2.830 -999.990 -999.990 1.094 ..P WKT 2010 05 20 02 39 55 31.3200 -97.3300 251.000 30.0 115.997 3.540 -999.990 -999.990 1.160 ..P WKT 2010 05 20 02 44 55 31.3200 -97.3300 251.000 122.0 113.247 3.180 -999.990 -999.990 1.132 ..P WKT 2010 05 20 02 49 55 31.3200 -97.3300 251.000 457.0 108.101 2.790 -999.990 -999.990 1.081 ..P WKT 2010 05 20 02 54 55 31.3200 -97.3300 251.000 30.0 116.213 2.730 -999.990 -999.990 1.162 ..P WKT 2010 05 20 02 59 55 31.3200 -97.3300 251.000 122.0 111.775 2.410 -999.990 -999.990 1.118 ..P WKT 2010 05 20 03 04 55 31.3200 -97.3300 251.000 457.0 98.039 2.660 -999.990 -999.990 0.980 ..P WKT 2010 05 20 03 14 55 31.3200 -97.3300 251.000 30.0 116.078 2.860 -999.990 -999.990 1.161 ..P WKT 2010 05 20 03 19 55 31.3200 -97.3300 251.000 122.0 112.209 2.760 -999.990 -999.990 1.122 ..P WKT 2010 05 20 03 24 55 31.3200 -97.3300 251.000 457.0 104.684 2.030 -999.990 -999.990 1.047 ..P WKT 2010 05 20 03 29 55 31.3200 -97.3300 251.000 30.0 112.496 2.890 -999.990 -999.990 1.125 ..P WKT 2010 05 20 03 34 55 31.3200 -97.3300 251.000 122.0 112.148 3.120 -999.990 -999.990 1.121 ..P WKT 2010 05 20 03 39 55 31.3200 -97.3300 251.000 457.0 105.755 2.310 -999.990 -999.990 1.058 ..P WKT 2010 05 20 03 49 55 31.3200 -97.3300 251.000 30.0 106.487 4.270 -999.990 -999.990 1.065 ..P WKT 2010 05 20 03 54 55 31.3200 -97.3300 251.000 122.0 105.600 1.930 -999.990 -999.990 1.056 ..P WKT 2010 05 20 03 59 55 31.3200 -97.3300 251.000 457.0 97.552 2.750 -999.990 -999.990 0.976 ..P WKT 2010 05 20 04 04 55 31.3200 -97.3300 251.000 30.0 109.019 3.120 -999.990 -999.990 1.090 ..P WKT 2010 05 20 04 09 55 31.3200 -97.3300 251.000 122.0 98.450 2.950 -999.990 -999.990 0.985 ..P WKT 2010 05 20 04 14 55 31.3200 -97.3300 251.000 457.0 96.022 3.090 -999.990 -999.990 0.960 ..P WKT 2010 05 20 04 24 55 31.3200 -97.3300 251.000 30.0 99.784 2.410 -999.990 -999.990 0.998 ..P WKT 2010 05 20 04 29 55 31.3200 -97.3300 251.000 122.0 107.927 2.370 -999.990 -999.990 1.079 ..P WKT 2010 05 20 04 34 55 31.3200 -97.3300 251.000 457.0 99.117 2.270 -999.990 -999.990 0.991 ..P WKT 2010 05 20 04 39 55 31.3200 -97.3300 251.000 30.0 100.815 3.990 -999.990 -999.990 1.008 ..P WKT 2010 05 20 04 44 55 31.3200 -97.3300 251.000 122.0 100.831 3.610 -999.990 -999.990 1.008 ..P WKT 2010 05 20 04 49 55 31.3200 -97.3300 251.000 457.0 103.927 2.170 -999.990 -999.990 1.039 ..P WKT 2010 05 20 05 04 55 31.3200 -97.3300 251.000 30.0 93.579 2.240 -999.990 -999.990 0.936 ..P WKT 2010 05 20 05 09 55 31.3200 -97.3300 251.000 122.0 98.744 2.500 -999.990 -999.990 0.987 ..P WKT 2010 05 20 05 14 55 31.3200 -97.3300 251.000 457.0 104.464 4.740 -999.990 -999.990 1.045 ..P WKT 2010 05 20 05 19 55 31.3200 -97.3300 251.000 30.0 94.819 2.220 -999.990 -999.990 0.948 ..P WKT 2010 05 20 05 24 55 31.3200 -97.3300 251.000 122.0 97.186 4.580 -999.990 -999.990 0.972 ..P WKT 2010 05 20 05 29 55 31.3200 -97.3300 251.000 457.0 100.389 2.130 -999.990 -999.990 1.004 ..P WKT 2010 05 20 05 39 55 31.3200 -97.3300 251.000 30.0 95.895 2.330 -999.990 -999.990 0.959 ..P WKT 2010 05 20 05 44 55 31.3200 -97.3300 251.000 122.0 97.406 2.980 -999.990 -999.990 0.974 ..P WKT 2010 05 20 05 49 55 31.3200 -97.3300 251.000 457.0 104.493 3.600 -999.990 -999.990 1.045 ..P WKT 2010 05 20 05 54 55 31.3200 -97.3300 251.000 30.0 100.985 2.310 -999.990 -999.990 1.010 ..P WKT 2010 05 20 05 59 55 31.3200 -97.3300 251.000 122.0 103.608 2.440 -999.990 -999.990 1.036 ..P WKT 2010 05 20 06 04 55 31.3200 -97.3300 251.000 457.0 95.369 3.230 -999.990 -999.990 0.954 ..P WKT 2010 05 20 06 14 55 31.3200 -97.3300 251.000 30.0 100.276 2.570 -999.990 -999.990 1.003 ..P WKT 2010 05 20 06 19 55 31.3200 -97.3300 251.000 122.0 104.784 2.490 -999.990 -999.990 1.048 ..P WKT 2010 05 20 06 24 55 31.3200 -97.3300 251.000 457.0 105.951 2.970 -999.990 -999.990 1.060 ..P WKT 2010 05 20 06 29 55 31.3200 -97.3300 251.000 30.0 98.499 3.540 -999.990 -999.990 0.985 ..P WKT 2010 05 20 06 34 55 31.3200 -97.3300 251.000 122.0 108.006 2.470 -999.990 -999.990 1.080 ..P WKT 2010 05 20 06 39 55 31.3200 -97.3300 251.000 457.0 102.087 3.620 -999.990 -999.990 1.021 ..P WKT 2010 05 20 06 49 55 31.3200 -97.3300 251.000 30.0 102.179 3.050 -999.990 -999.990 1.022 ..P WKT 2010 05 20 06 54 55 31.3200 -97.3300 251.000 122.0 101.104 2.230 -999.990 -999.990 1.011 ..P WKT 2010 05 20 06 59 55 31.3200 -97.3300 251.000 457.0 107.245 3.460 -999.990 -999.990 1.072 ..P WKT 2010 05 20 07 04 55 31.3200 -97.3300 251.000 30.0 94.103 3.980 -999.990 -999.990 0.941 ..P WKT 2010 05 20 07 09 55 31.3200 -97.3300 251.000 122.0 96.222 2.650 -999.990 -999.990 0.962 ..P WKT 2010 05 20 07 14 55 31.3200 -97.3300 251.000 457.0 100.972 3.850 -999.990 -999.990 1.010 ..P WKT 2010 05 20 07 24 55 31.3200 -97.3300 251.000 30.0 95.802 2.640 -999.990 -999.990 0.958 ..P WKT 2010 05 20 07 29 55 31.3200 -97.3300 251.000 122.0 96.690 2.560 -999.990 -999.990 0.967 ..P WKT 2010 05 20 07 34 55 31.3200 -97.3300 251.000 457.0 102.561 3.240 -999.990 -999.990 1.026 ..P WKT 2010 05 20 07 39 55 31.3200 -97.3300 251.000 30.0 89.194 3.880 -999.990 -999.990 0.892 ..P WKT 2010 05 20 07 44 55 31.3200 -97.3300 251.000 122.0 101.704 3.240 -999.990 -999.990 1.017 ..P WKT 2010 05 20 07 49 55 31.3200 -97.3300 251.000 457.0 99.547 1.820 -999.990 -999.990 0.995 ..P WKT 2010 05 20 07 59 55 31.3200 -97.3300 251.000 30.0 91.389 4.550 -999.990 -999.990 0.914 ..P WKT 2010 05 20 08 04 55 31.3200 -97.3300 251.000 122.0 95.888 1.670 -999.990 -999.990 0.959 ..P WKT 2010 05 20 08 09 55 31.3200 -97.3300 251.000 457.0 102.456 2.650 -999.990 -999.990 1.025 ..P WKT 2010 05 20 08 14 55 31.3200 -97.3300 251.000 30.0 102.393 3.600 -999.990 -999.990 1.024 ..P WKT 2010 05 20 08 19 55 31.3200 -97.3300 251.000 122.0 96.396 2.650 -999.990 -999.990 0.964 ..P WKT 2010 05 20 08 24 55 31.3200 -97.3300 251.000 457.0 98.956 2.670 -999.990 -999.990 0.990 ..P WKT 2010 05 20 08 34 55 31.3200 -97.3300 251.000 30.0 89.457 1.980 -999.990 -999.990 0.895 ..P WKT 2010 05 20 08 39 55 31.3200 -97.3300 251.000 122.0 97.806 2.720 -999.990 -999.990 0.978 ..P WKT 2010 05 20 08 44 55 31.3200 -97.3300 251.000 457.0 104.497 4.420 -999.990 -999.990 1.045 ..P WKT 2010 05 20 08 49 55 31.3200 -97.3300 251.000 30.0 103.744 4.930 -999.990 -999.990 1.037 ..P WKT 2010 05 20 08 54 55 31.3200 -97.3300 251.000 122.0 106.023 3.590 -999.990 -999.990 1.060 ..P WKT 2010 05 20 08 59 55 31.3200 -97.3300 251.000 457.0 100.865 2.440 -999.990 -999.990 1.009 ..P WKT 2010 05 20 09 09 55 31.3200 -97.3300 251.000 30.0 100.427 2.740 -999.990 -999.990 1.004 ..P WKT 2010 05 20 09 14 55 31.3200 -97.3300 251.000 122.0 102.388 3.930 -999.990 -999.990 1.024 ..P WKT 2010 05 20 09 19 55 31.3200 -97.3300 251.000 457.0 95.825 4.230 -999.990 -999.990 0.958 ..P WKT 2010 05 20 09 24 55 31.3200 -97.3300 251.000 30.0 96.962 3.270 -999.990 -999.990 0.970 ..P WKT 2010 05 20 09 29 55 31.3200 -97.3300 251.000 122.0 102.495 3.070 -999.990 -999.990 1.025 ..P WKT 2010 05 20 09 34 55 31.3200 -97.3300 251.000 457.0 96.762 2.970 -999.990 -999.990 0.968 ..P WKT 2010 05 20 09 44 55 31.3200 -97.3300 251.000 30.0 91.150 2.840 -999.990 -999.990 0.912 ..P WKT 2010 05 20 09 49 55 31.3200 -97.3300 251.000 122.0 97.580 3.400 -999.990 -999.990 0.976 ..P WKT 2010 05 20 09 54 55 31.3200 -97.3300 251.000 457.0 99.067 3.090 -999.990 -999.990 0.991 ..P WKT 2010 05 20 09 59 55 31.3200 -97.3300 251.000 30.0 102.198 3.440 -999.990 -999.990 1.022 ..P WKT 2010 05 20 10 04 55 31.3200 -97.3300 251.000 122.0 105.328 2.960 -999.990 -999.990 1.053 ..P WKT 2010 05 20 10 09 55 31.3200 -97.3300 251.000 457.0 98.863 2.570 -999.990 -999.990 0.989 ..P WKT 2010 05 20 10 19 55 31.3200 -97.3300 251.000 30.0 96.413 2.570 -999.990 -999.990 0.964 ..P WKT 2010 05 20 10 24 55 31.3200 -97.3300 251.000 122.0 99.326 3.200 -999.990 -999.990 0.993 ..P WKT 2010 05 20 10 29 55 31.3200 -97.3300 251.000 457.0 94.024 3.150 -999.990 -999.990 0.940 ..P WKT 2010 05 20 10 34 55 31.3200 -97.3300 251.000 30.0 98.988 2.600 -999.990 -999.990 0.990 ..P WKT 2010 05 20 10 39 55 31.3200 -97.3300 251.000 122.0 91.776 3.510 -999.990 -999.990 0.918 ..P WKT 2010 05 20 10 44 55 31.3200 -97.3300 251.000 457.0 91.815 2.630 -999.990 -999.990 0.918 ..P WKT 2010 05 20 10 54 55 31.3200 -97.3300 251.000 30.0 93.844 2.830 -999.990 -999.990 0.938 ..P WKT 2010 05 20 10 59 55 31.3200 -97.3300 251.000 122.0 97.200 2.250 -999.990 -999.990 0.972 ..P WKT 2010 05 20 11 04 55 31.3200 -97.3300 251.000 457.0 87.581 3.790 -999.990 -999.990 0.876 ..P WKT 2010 05 20 11 09 55 31.3200 -97.3300 251.000 30.0 93.256 3.720 -999.990 -999.990 0.933 ..P WKT 2010 05 20 11 14 55 31.3200 -97.3300 251.000 122.0 95.244 2.590 -999.990 -999.990 0.952 ..P WKT 2010 05 20 11 19 55 31.3200 -97.3300 251.000 457.0 95.729 3.300 -999.990 -999.990 0.957 ..P WKT 2010 05 20 11 29 55 31.3200 -97.3300 251.000 30.0 95.527 2.890 -999.990 -999.990 0.955 ..P WKT 2010 05 20 11 34 55 31.3200 -97.3300 251.000 122.0 102.607 3.390 -999.990 -999.990 1.026 ..P WKT 2010 05 20 11 39 55 31.3200 -97.3300 251.000 457.0 95.514 3.840 -999.990 -999.990 0.955 ..P WKT 2010 05 20 11 44 55 31.3200 -97.3300 251.000 30.0 97.960 2.460 -999.990 -999.990 0.980 ..P WKT 2010 05 20 11 49 55 31.3200 -97.3300 251.000 122.0 101.492 2.800 -999.990 -999.990 1.015 ..P WKT 2010 05 20 12 09 55 31.3200 -97.3300 251.000 457.0 98.455 2.170 -999.990 -999.990 0.985 ..P WKT 2010 05 20 12 10 25 31.3200 -97.3300 251.000 457.0 100.187 2.320 -999.990 -999.990 1.002 ..P WKT 2010 05 20 12 10 55 31.3200 -97.3300 251.000 457.0 94.025 3.870 -999.990 -999.990 0.940 ..P WKT 2010 05 20 12 11 25 31.3200 -97.3300 251.000 457.0 100.247 3.590 -999.990 -999.990 1.002 ..P WKT 2010 05 20 12 11 55 31.3200 -97.3300 251.000 457.0 99.937 2.230 -999.990 -999.990 0.999 ..P WKT 2010 05 20 12 12 25 31.3200 -97.3300 251.000 457.0 101.124 2.300 -999.990 -999.990 1.011 ..P WKT 2010 05 20 12 12 55 31.3200 -97.3300 251.000 457.0 99.453 2.290 -999.990 -999.990 0.995 ..P WKT 2010 05 20 12 13 25 31.3200 -97.3300 251.000 457.0 99.552 2.160 -999.990 -999.990 0.996 ..P WKT 2010 05 20 12 13 55 31.3200 -97.3300 251.000 457.0 101.691 2.120 -999.990 -999.990 1.017 ..P WKT 2010 05 20 12 14 25 31.3200 -97.3300 251.000 457.0 100.428 2.230 -999.990 -999.990 1.004 ..P WKT 2010 05 20 12 14 55 31.3200 -97.3300 251.000 457.0 98.214 2.010 -999.990 -999.990 0.982 ..P WKT 2010 05 20 12 19 55 31.3200 -97.3300 251.000 30.0 102.463 4.520 -999.990 -999.990 1.025 ..P WKT 2010 05 20 12 24 55 31.3200 -97.3300 251.000 122.0 103.175 2.830 -999.990 -999.990 1.032 ..P WKT 2010 05 20 12 29 55 31.3200 -97.3300 251.000 457.0 98.168 3.300 -999.990 -999.990 0.982 ..P WKT 2010 05 20 12 34 55 31.3200 -97.3300 251.000 30.0 105.414 3.280 -999.990 -999.990 1.054 ..P WKT 2010 05 20 12 39 55 31.3200 -97.3300 251.000 122.0 98.229 2.710 -999.990 -999.990 0.982 ..P WKT 2010 05 20 12 44 55 31.3200 -97.3300 251.000 457.0 97.579 2.870 -999.990 -999.990 0.976 ..P WKT 2010 05 20 12 54 55 31.3200 -97.3300 251.000 30.0 98.422 2.100 -999.990 -999.990 0.984 ..P WKT 2010 05 20 12 59 55 31.3200 -97.3300 251.000 122.0 105.637 2.990 -999.990 -999.990 1.056 ..P WKT 2010 05 20 13 04 55 31.3200 -97.3300 251.000 457.0 100.866 4.030 -999.990 -999.990 1.009 ..P WKT 2010 05 20 13 09 55 31.3200 -97.3300 251.000 30.0 103.723 3.350 -999.990 -999.990 1.037 ..P WKT 2010 05 20 13 14 55 31.3200 -97.3300 251.000 122.0 101.403 3.390 -999.990 -999.990 1.014 ..P WKT 2010 05 20 13 19 55 31.3200 -97.3300 251.000 457.0 106.169 2.530 -999.990 -999.990 1.062 ..P WKT 2010 05 20 13 29 55 31.3200 -97.3300 251.000 30.0 105.266 2.610 -999.990 -999.990 1.053 ..P WKT 2010 05 20 13 34 55 31.3200 -97.3300 251.000 122.0 103.412 3.190 -999.990 -999.990 1.034 ..P WKT 2010 05 20 13 39 55 31.3200 -97.3300 251.000 457.0 103.467 3.400 -999.990 -999.990 1.035 ..P WKT 2010 05 20 13 44 55 31.3200 -97.3300 251.000 30.0 98.068 2.850 -999.990 -999.990 0.981 ..P WKT 2010 05 20 13 49 55 31.3200 -97.3300 251.000 122.0 101.394 2.580 -999.990 -999.990 1.014 ..P WKT 2010 05 20 13 54 55 31.3200 -97.3300 251.000 457.0 100.358 3.130 -999.990 -999.990 1.004 ..P WKT 2010 05 20 14 04 55 31.3200 -97.3300 251.000 30.0 101.655 1.770 -999.990 -999.990 1.017 ..P WKT 2010 05 20 14 09 55 31.3200 -97.3300 251.000 122.0 106.992 3.960 -999.990 -999.990 1.070 ..P WKT 2010 05 20 14 14 55 31.3200 -97.3300 251.000 457.0 102.506 2.780 -999.990 -999.990 1.025 ..P WKT 2010 05 20 14 19 55 31.3200 -97.3300 251.000 30.0 96.654 2.690 -999.990 -999.990 0.967 ..P WKT 2010 05 20 14 24 55 31.3200 -97.3300 251.000 122.0 96.806 4.050 -999.990 -999.990 0.968 ..P WKT 2010 05 20 14 29 55 31.3200 -97.3300 251.000 457.0 98.049 3.430 -999.990 -999.990 0.980 ..P WKT 2010 05 20 14 39 55 31.3200 -97.3300 251.000 30.0 91.586 3.430 -999.990 -999.990 0.916 ..P WKT 2010 05 20 14 44 55 31.3200 -97.3300 251.000 122.0 101.488 3.420 -999.990 -999.990 1.015 ..P WKT 2010 05 20 14 49 55 31.3200 -97.3300 251.000 457.0 98.832 2.890 -999.990 -999.990 0.988 ..P WKT 2010 05 20 14 54 55 31.3200 -97.3300 251.000 30.0 97.540 4.070 -999.990 -999.990 0.975 ..P WKT 2010 05 20 14 59 55 31.3200 -97.3300 251.000 122.0 112.362 3.720 -999.990 -999.990 1.124 ..P WKT 2010 05 20 15 04 55 31.3200 -97.3300 251.000 457.0 108.067 3.000 -999.990 -999.990 1.081 ..P WKT 2010 05 20 15 14 55 31.3200 -97.3300 251.000 30.0 111.105 3.670 -999.990 -999.990 1.111 ..P WKT 2010 05 20 15 19 55 31.3200 -97.3300 251.000 122.0 112.565 3.490 -999.990 -999.990 1.126 ..P WKT 2010 05 20 15 24 55 31.3200 -97.3300 251.000 457.0 108.288 3.300 -999.990 -999.990 1.083 ..P WKT 2010 05 20 15 29 55 31.3200 -97.3300 251.000 30.0 105.240 4.200 -999.990 -999.990 1.052 ..P WKT 2010 05 20 15 34 55 31.3200 -97.3300 251.000 122.0 112.167 3.890 -999.990 -999.990 1.122 ..P WKT 2010 05 20 15 39 55 31.3200 -97.3300 251.000 457.0 108.708 3.090 -999.990 -999.990 1.087 ..P WKT 2010 05 20 15 49 55 31.3200 -97.3300 251.000 30.0 110.225 3.340 -999.990 -999.990 1.102 ..P WKT 2010 05 20 15 54 55 31.3200 -97.3300 251.000 122.0 107.683 3.270 -999.990 -999.990 1.077 ..P WKT 2010 05 20 15 59 55 31.3200 -97.3300 251.000 457.0 114.302 3.730 -999.990 -999.990 1.143 ..P WKT 2010 05 20 16 04 55 31.3200 -97.3300 251.000 30.0 106.290 4.450 -999.990 -999.990 1.063 ..P WKT 2010 05 20 16 09 55 31.3200 -97.3300 251.000 122.0 110.174 4.080 -999.990 -999.990 1.102 ..P WKT 2010 05 20 16 14 55 31.3200 -97.3300 251.000 457.0 106.947 3.450 -999.990 -999.990 1.069 ..P WKT 2010 05 20 16 24 55 31.3200 -97.3300 251.000 30.0 100.941 3.930 -999.990 -999.990 1.009 ..P WKT 2010 05 20 16 29 55 31.3200 -97.3300 251.000 122.0 112.391 4.730 -999.990 -999.990 1.124 ..P WKT 2010 05 20 16 34 55 31.3200 -97.3300 251.000 457.0 106.329 5.300 -999.990 -999.990 1.063 ..P WKT 2010 05 20 16 39 55 31.3200 -97.3300 251.000 30.0 107.928 3.540 -999.990 -999.990 1.079 ..P WKT 2010 05 20 16 44 55 31.3200 -97.3300 251.000 122.0 114.181 3.500 -999.990 -999.990 1.142 ..P WKT 2010 05 20 16 49 55 31.3200 -97.3300 251.000 457.0 113.866 3.160 -999.990 -999.990 1.139 ..P WKT 2010 05 20 17 04 55 31.3200 -97.3300 251.000 30.0 96.606 3.450 -999.990 -999.990 0.966 ..P WKT 2010 05 20 17 09 55 31.3200 -97.3300 251.000 122.0 104.975 3.330 -999.990 -999.990 1.050 ..P WKT 2010 05 20 17 14 55 31.3200 -97.3300 251.000 457.0 100.745 3.180 -999.990 -999.990 1.007 ..P WKT 2010 05 20 17 19 55 31.3200 -97.3300 251.000 30.0 97.884 3.350 -999.990 -999.990 0.979 ..P WKT 2010 05 20 17 24 55 31.3200 -97.3300 251.000 122.0 107.077 2.850 -999.990 -999.990 1.071 ..P WKT 2010 05 20 17 29 55 31.3200 -97.3300 251.000 457.0 101.476 3.170 -999.990 -999.990 1.015 ..P WKT 2010 05 20 17 39 55 31.3200 -97.3300 251.000 30.0 106.930 4.430 -999.990 -999.990 1.069 ..P WKT 2010 05 20 17 44 55 31.3200 -97.3300 251.000 122.0 115.794 4.300 -999.990 -999.990 1.158 ..P WKT 2010 05 20 17 49 55 31.3200 -97.3300 251.000 457.0 113.149 2.590 -999.990 -999.990 1.131 ..P WKT 2010 05 20 17 54 55 31.3200 -97.3300 251.000 30.0 109.132 2.560 -999.990 -999.990 1.091 ..P WKT 2010 05 20 17 59 55 31.3200 -97.3300 251.000 122.0 114.162 3.520 -999.990 -999.990 1.142 ..P WKT 2010 05 20 18 04 55 31.3200 -97.3300 251.000 457.0 115.903 2.420 -999.990 -999.990 1.159 ..P WKT 2010 05 20 18 14 55 31.3200 -97.3300 251.000 30.0 112.548 3.130 -999.990 -999.990 1.125 ..P WKT 2010 05 20 18 19 55 31.3200 -97.3300 251.000 122.0 121.165 2.310 -999.990 -999.990 1.212 ..P WKT 2010 05 20 18 24 55 31.3200 -97.3300 251.000 457.0 111.132 2.310 -999.990 -999.990 1.111 ..P WKT 2010 05 20 18 29 55 31.3200 -97.3300 251.000 30.0 113.441 2.600 -999.990 -999.990 1.134 ..P WKT 2010 05 20 18 34 55 31.3200 -97.3300 251.000 122.0 111.224 2.640 -999.990 -999.990 1.112 ..P WKT 2010 05 20 18 39 55 31.3200 -97.3300 251.000 457.0 107.771 2.400 -999.990 -999.990 1.078 ..P WKT 2010 05 20 18 49 55 31.3200 -97.3300 251.000 30.0 111.392 2.790 -999.990 -999.990 1.114 ..P WKT 2010 05 20 18 54 55 31.3200 -97.3300 251.000 122.0 117.917 3.460 -999.990 -999.990 1.179 ..P WKT 2010 05 20 18 59 55 31.3200 -97.3300 251.000 457.0 113.464 3.070 -999.990 -999.990 1.135 ..P WKT 2010 05 20 19 04 55 31.3200 -97.3300 251.000 30.0 116.422 4.790 -999.990 -999.990 1.164 ..P WKT 2010 05 20 19 09 55 31.3200 -97.3300 251.000 122.0 123.637 3.360 -999.990 -999.990 1.236 ..P WKT 2010 05 20 19 14 55 31.3200 -97.3300 251.000 457.0 113.554 2.330 -999.990 -999.990 1.136 ..P WKT 2010 05 20 19 24 55 31.3200 -97.3300 251.000 30.0 120.219 3.140 -999.990 -999.990 1.202 ..P WKT 2010 05 20 19 29 55 31.3200 -97.3300 251.000 122.0 123.238 3.930 -999.990 -999.990 1.232 ..P WKT 2010 05 20 19 34 55 31.3200 -97.3300 251.000 457.0 118.430 3.990 -999.990 -999.990 1.184 ..P WKT 2010 05 20 19 39 55 31.3200 -97.3300 251.000 30.0 113.894 3.630 -999.990 -999.990 1.139 ..P WKT 2010 05 20 19 44 55 31.3200 -97.3300 251.000 122.0 125.981 3.260 -999.990 -999.990 1.260 ..P WKT 2010 05 20 19 49 55 31.3200 -97.3300 251.000 457.0 114.576 2.440 -999.990 -999.990 1.146 ..P WKT 2010 05 20 19 59 55 31.3200 -97.3300 251.000 30.0 115.298 3.360 -999.990 -999.990 1.153 ..P WKT 2010 05 20 20 04 55 31.3200 -97.3300 251.000 122.0 129.215 3.100 -999.990 -999.990 1.292 ..P WKT 2010 05 20 20 09 55 31.3200 -97.3300 251.000 457.0 118.120 3.670 -999.990 -999.990 1.181 ..P WKT 2010 05 20 20 14 55 31.3200 -97.3300 251.000 30.0 126.817 3.610 -999.990 -999.990 1.268 ..P WKT 2010 05 20 20 19 55 31.3200 -97.3300 251.000 122.0 131.117 2.030 -999.990 -999.990 1.311 ..P WKT 2010 05 20 20 24 55 31.3200 -97.3300 251.000 457.0 125.519 1.810 -999.990 -999.990 1.255 ..P WKT 2010 05 20 20 34 55 31.3200 -97.3300 251.000 30.0 121.449 2.020 -999.990 -999.990 1.214 ..P WKT 2010 05 20 20 39 55 31.3200 -97.3300 251.000 122.0 124.767 1.770 -999.990 -999.990 1.248 ..P WKT 2010 05 20 20 44 55 31.3200 -97.3300 251.000 457.0 115.983 1.650 -999.990 -999.990 1.160 ..P WKT 2010 05 20 20 49 55 31.3200 -97.3300 251.000 30.0 115.450 1.660 -999.990 -999.990 1.155 ..P WKT 2010 05 20 20 54 55 31.3200 -97.3300 251.000 122.0 121.796 1.790 -999.990 -999.990 1.218 ..P WKT 2010 05 20 20 59 55 31.3200 -97.3300 251.000 457.0 117.961 2.930 -999.990 -999.990 1.180 ..P WKT 2010 05 20 21 09 55 31.3200 -97.3300 251.000 30.0 122.321 2.670 -999.990 -999.990 1.223 ..P WKT 2010 05 20 21 14 55 31.3200 -97.3300 251.000 122.0 119.508 2.640 -999.990 -999.990 1.195 ..P WKT 2010 05 20 21 19 55 31.3200 -97.3300 251.000 457.0 118.346 2.250 -999.990 -999.990 1.183 ..P WKT 2010 05 20 21 24 55 31.3200 -97.3300 251.000 30.0 116.907 1.890 -999.990 -999.990 1.169 ..P WKT 2010 05 20 21 29 55 31.3200 -97.3300 251.000 122.0 125.657 2.630 -999.990 -999.990 1.257 ..P WKT 2010 05 20 21 34 55 31.3200 -97.3300 251.000 457.0 122.293 1.890 -999.990 -999.990 1.223 ..P WKT 2010 05 20 21 44 55 31.3200 -97.3300 251.000 30.0 119.062 2.570 -999.990 -999.990 1.191 ..P WKT 2010 05 20 21 49 55 31.3200 -97.3300 251.000 122.0 119.198 2.850 -999.990 -999.990 1.192 ..P WKT 2010 05 20 21 54 55 31.3200 -97.3300 251.000 457.0 124.018 2.010 -999.990 -999.990 1.240 ..P WKT 2010 05 20 21 59 55 31.3200 -97.3300 251.000 30.0 115.888 2.770 -999.990 -999.990 1.159 ..P WKT 2010 05 20 22 04 55 31.3200 -97.3300 251.000 122.0 127.321 2.130 -999.990 -999.990 1.273 ..P WKT 2010 05 20 22 09 55 31.3200 -97.3300 251.000 457.0 125.804 2.810 -999.990 -999.990 1.258 ..P WKT 2010 05 20 22 19 55 31.3200 -97.3300 251.000 30.0 121.076 3.080 -999.990 -999.990 1.211 ..P WKT 2010 05 20 22 24 55 31.3200 -97.3300 251.000 122.0 133.716 3.460 -999.990 -999.990 1.337 ..P WKT 2010 05 20 22 29 55 31.3200 -97.3300 251.000 457.0 123.336 2.360 -999.990 -999.990 1.233 ..P WKT 2010 05 20 22 34 55 31.3200 -97.3300 251.000 30.0 121.090 2.440 -999.990 -999.990 1.211 ..P WKT 2010 05 20 22 39 55 31.3200 -97.3300 251.000 122.0 130.011 3.100 -999.990 -999.990 1.300 ..P WKT 2010 05 20 22 44 55 31.3200 -97.3300 251.000 457.0 123.903 2.520 -999.990 -999.990 1.239 ..P WKT 2010 05 20 22 54 55 31.3200 -97.3300 251.000 30.0 125.141 2.820 -999.990 -999.990 1.251 ..P WKT 2010 05 20 22 59 55 31.3200 -97.3300 251.000 122.0 127.662 2.510 -999.990 -999.990 1.277 ..P WKT 2010 05 20 23 04 55 31.3200 -97.3300 251.000 457.0 123.010 4.390 -999.990 -999.990 1.230 ..P WKT 2010 05 20 23 09 55 31.3200 -97.3300 251.000 30.0 119.322 4.940 -999.990 -999.990 1.193 ..P WKT 2010 05 20 23 14 55 31.3200 -97.3300 251.000 122.0 128.467 4.140 -999.990 -999.990 1.285 ..P WKT 2010 05 20 23 19 55 31.3200 -97.3300 251.000 457.0 125.883 3.830 -999.990 -999.990 1.259 ..P WKT 2010 05 20 23 29 55 31.3200 -97.3300 251.000 30.0 119.625 3.270 -999.990 -999.990 1.196 ..P WKT 2010 05 20 23 34 55 31.3200 -97.3300 251.000 122.0 133.205 4.670 -999.990 -999.990 1.332 ..P WKT 2010 05 20 23 39 55 31.3200 -97.3300 251.000 457.0 123.181 4.670 -999.990 -999.990 1.232 ..P WKT 2010 05 20 23 44 55 31.3200 -97.3300 251.000 30.0 120.886 5.580 -999.990 -999.990 1.209 ..P WKT 2010 05 20 23 49 55 31.3200 -97.3300 251.000 122.0 125.219 5.050 -999.990 -999.990 1.252 ..P WKT 2010 05 21 00 09 55 31.3200 -97.3300 251.000 457.0 126.981 4.850 -999.990 -999.990 1.270 ..P WKT 2010 05 21 00 10 25 31.3200 -97.3300 251.000 457.0 117.382 2.620 -999.990 -999.990 1.174 ..P WKT 2010 05 21 00 10 55 31.3200 -97.3300 251.000 457.0 122.835 4.970 -999.990 -999.990 1.228 ..P WKT 2010 05 21 00 11 25 31.3200 -97.3300 251.000 457.0 124.008 3.200 -999.990 -999.990 1.240 ..P WKT 2010 05 21 00 11 55 31.3200 -97.3300 251.000 457.0 126.976 3.460 -999.990 -999.990 1.270 ..P WKT 2010 05 21 00 12 25 31.3200 -97.3300 251.000 457.0 125.939 3.170 -999.990 -999.990 1.259 ..P WKT 2010 05 21 00 12 55 31.3200 -97.3300 251.000 457.0 125.040 4.200 -999.990 -999.990 1.250 ..P WKT 2010 05 21 00 13 25 31.3200 -97.3300 251.000 457.0 121.104 4.440 -999.990 -999.990 1.211 ..P WKT 2010 05 21 00 13 55 31.3200 -97.3300 251.000 457.0 117.857 3.690 -999.990 -999.990 1.179 ..P WKT 2010 05 21 00 14 25 31.3200 -97.3300 251.000 457.0 120.273 3.920 -999.990 -999.990 1.203 ..P WKT 2010 05 21 00 14 55 31.3200 -97.3300 251.000 457.0 122.550 4.260 -999.990 -999.990 1.226 ..P WKT 2010 05 21 00 19 55 31.3200 -97.3300 251.000 30.0 128.200 4.580 -999.990 -999.990 1.282 ..P WKT 2010 05 21 00 24 55 31.3200 -97.3300 251.000 122.0 132.468 5.220 -999.990 -999.990 1.325 ..P WKT 2010 05 21 00 29 55 31.3200 -97.3300 251.000 457.0 122.654 4.620 -999.990 -999.990 1.227 ..P WKT 2010 05 21 00 34 55 31.3200 -97.3300 251.000 30.0 122.505 3.360 -999.990 -999.990 1.225 ..P WKT 2010 05 21 00 39 55 31.3200 -97.3300 251.000 122.0 130.913 2.840 -999.990 -999.990 1.309 ..P WKT 2010 05 21 00 44 55 31.3200 -97.3300 251.000 457.0 133.523 2.420 -999.990 -999.990 1.335 ..P WKT 2010 05 21 00 54 55 31.3200 -97.3300 251.000 30.0 132.296 2.230 -999.990 -999.990 1.323 ..P WKT 2010 05 21 00 59 55 31.3200 -97.3300 251.000 122.0 128.460 3.200 -999.990 -999.990 1.285 ..P WKT 2010 05 21 01 04 55 31.3200 -97.3300 251.000 457.0 129.039 3.710 -999.990 -999.990 1.290 ..P WKT 2010 05 21 01 09 55 31.3200 -97.3300 251.000 30.0 122.169 2.930 -999.990 -999.990 1.222 ..P WKT 2010 05 21 01 14 55 31.3200 -97.3300 251.000 122.0 126.887 2.230 -999.990 -999.990 1.269 ..P WKT 2010 05 21 01 19 55 31.3200 -97.3300 251.000 457.0 126.087 2.420 -999.990 -999.990 1.261 ..P WKT 2010 05 21 01 29 55 31.3200 -97.3300 251.000 30.0 137.768 2.590 -999.990 -999.990 1.378 ..P WKT 2010 05 21 01 34 55 31.3200 -97.3300 251.000 122.0 129.835 2.790 -999.990 -999.990 1.298 ..P WKT 2010 05 21 01 39 55 31.3200 -97.3300 251.000 457.0 125.765 2.650 -999.990 -999.990 1.258 ..P WKT 2010 05 21 01 44 55 31.3200 -97.3300 251.000 30.0 128.039 3.840 -999.990 -999.990 1.280 ..P WKT 2010 05 21 01 49 55 31.3200 -97.3300 251.000 122.0 119.556 2.070 -999.990 -999.990 1.196 ..P WKT 2010 05 21 01 54 55 31.3200 -97.3300 251.000 457.0 121.555 2.350 -999.990 -999.990 1.216 ..P WKT 2010 05 21 02 04 55 31.3200 -97.3300 251.000 30.0 123.068 2.120 -999.990 -999.990 1.231 ..P WKT 2010 05 21 02 09 55 31.3200 -97.3300 251.000 122.0 114.865 3.390 -999.990 -999.990 1.149 ..P WKT 2010 05 21 02 14 55 31.3200 -97.3300 251.000 457.0 112.038 4.080 -999.990 -999.990 1.120 ..P WKT 2010 05 21 02 19 55 31.3200 -97.3300 251.000 30.0 119.687 4.860 -999.990 -999.990 1.197 ..P WKT 2010 05 21 02 24 55 31.3200 -97.3300 251.000 122.0 115.620 3.730 -999.990 -999.990 1.156 ..P WKT 2010 05 21 02 29 55 31.3200 -97.3300 251.000 457.0 119.133 3.240 -999.990 -999.990 1.191 ..P WKT 2010 05 21 02 39 55 31.3200 -97.3300 251.000 30.0 117.359 3.120 -999.990 -999.990 1.174 ..P WKT 2010 05 21 02 44 55 31.3200 -97.3300 251.000 122.0 121.441 3.690 -999.990 -999.990 1.214 ..P WKT 2010 05 21 02 49 55 31.3200 -97.3300 251.000 457.0 114.366 4.770 -999.990 -999.990 1.144 ..P WKT 2010 05 21 02 54 55 31.3200 -97.3300 251.000 30.0 112.387 4.710 -999.990 -999.990 1.124 ..P WKT 2010 05 21 02 59 55 31.3200 -97.3300 251.000 122.0 109.307 4.150 -999.990 -999.990 1.093 ..P WKT 2010 05 21 03 04 55 31.3200 -97.3300 251.000 457.0 109.808 3.850 -999.990 -999.990 1.098 ..P WKT 2010 05 21 03 14 55 31.3200 -97.3300 251.000 30.0 112.109 3.960 -999.990 -999.990 1.121 ..P WKT 2010 05 21 03 19 55 31.3200 -97.3300 251.000 122.0 113.770 3.650 -999.990 -999.990 1.138 ..P WKT 2010 05 21 03 24 55 31.3200 -97.3300 251.000 457.0 117.221 5.500 -999.990 -999.990 1.172 ..P WKT 2010 05 21 03 29 55 31.3200 -97.3300 251.000 30.0 111.585 4.180 -999.990 -999.990 1.116 ..P WKT 2010 05 21 03 34 55 31.3200 -97.3300 251.000 122.0 114.760 3.400 -999.990 -999.990 1.148 ..P WKT 2010 05 21 03 39 55 31.3200 -97.3300 251.000 457.0 125.919 3.540 -999.990 -999.990 1.259 ..P WKT 2010 05 21 03 49 55 31.3200 -97.3300 251.000 30.0 109.420 3.560 -999.990 -999.990 1.094 ..P WKT 2010 05 21 03 54 55 31.3200 -97.3300 251.000 122.0 115.484 3.000 -999.990 -999.990 1.155 ..P WKT 2010 05 21 03 59 55 31.3200 -97.3300 251.000 457.0 122.235 3.940 -999.990 -999.990 1.222 ..P WKT 2010 05 21 04 04 55 31.3200 -97.3300 251.000 30.0 107.935 2.480 -999.990 -999.990 1.079 ..P WKT 2010 05 21 04 09 55 31.3200 -97.3300 251.000 122.0 113.447 2.220 -999.990 -999.990 1.134 ..P WKT 2010 05 21 04 14 55 31.3200 -97.3300 251.000 457.0 122.123 2.410 -999.990 -999.990 1.221 ..P WKT 2010 05 21 04 24 55 31.3200 -97.3300 251.000 30.0 114.456 3.080 -999.990 -999.990 1.145 ..P WKT 2010 05 21 04 29 55 31.3200 -97.3300 251.000 122.0 109.809 2.540 -999.990 -999.990 1.098 ..P WKT 2010 05 21 04 34 55 31.3200 -97.3300 251.000 457.0 113.688 2.360 -999.990 -999.990 1.137 ..P WKT 2010 05 21 04 39 55 31.3200 -97.3300 251.000 30.0 113.167 2.480 -999.990 -999.990 1.132 ..P WKT 2010 05 21 04 44 55 31.3200 -97.3300 251.000 122.0 121.171 2.790 -999.990 -999.990 1.212 ..P WKT 2010 05 21 04 49 55 31.3200 -97.3300 251.000 457.0 120.649 4.060 -999.990 -999.990 1.206 ..P WKT 2010 05 21 05 04 55 31.3200 -97.3300 251.000 30.0 118.524 3.420 -999.990 -999.990 1.185 ..P WKT 2010 05 21 05 09 55 31.3200 -97.3300 251.000 122.0 117.585 2.590 -999.990 -999.990 1.176 ..P WKT 2010 05 21 05 14 55 31.3200 -97.3300 251.000 457.0 114.448 3.910 -999.990 -999.990 1.144 ..P WKT 2010 05 21 05 19 55 31.3200 -97.3300 251.000 30.0 120.930 5.050 -999.990 -999.990 1.209 ..P WKT 2010 05 21 05 24 55 31.3200 -97.3300 251.000 122.0 125.488 2.580 -999.990 -999.990 1.255 ..P WKT 2010 05 21 05 29 55 31.3200 -97.3300 251.000 457.0 119.877 3.330 -999.990 -999.990 1.199 ..P WKT 2010 05 21 05 39 55 31.3200 -97.3300 251.000 30.0 120.419 3.240 -999.990 -999.990 1.204 ..P WKT 2010 05 21 05 44 55 31.3200 -97.3300 251.000 122.0 114.481 3.550 -999.990 -999.990 1.145 ..P WKT 2010 05 21 05 49 55 31.3200 -97.3300 251.000 457.0 116.237 3.750 -999.990 -999.990 1.162 ..P WKT 2010 05 21 05 54 55 31.3200 -97.3300 251.000 30.0 119.366 4.120 -999.990 -999.990 1.194 ..P WKT 2010 05 21 05 59 55 31.3200 -97.3300 251.000 122.0 113.704 4.700 -999.990 -999.990 1.137 ..P WKT 2010 05 21 06 04 55 31.3200 -97.3300 251.000 457.0 110.789 5.070 -999.990 -999.990 1.108 ..P WKT 2010 05 21 06 14 55 31.3200 -97.3300 251.000 30.0 118.477 4.990 -999.990 -999.990 1.185 ..P WKT 2010 05 21 06 19 55 31.3200 -97.3300 251.000 122.0 115.073 4.740 -999.990 -999.990 1.151 ..P WKT 2010 05 21 06 24 55 31.3200 -97.3300 251.000 457.0 102.334 3.960 -999.990 -999.990 1.023 ..P WKT 2010 05 21 06 29 55 31.3200 -97.3300 251.000 30.0 116.091 3.600 -999.990 -999.990 1.161 ..P WKT 2010 05 21 06 34 55 31.3200 -97.3300 251.000 122.0 107.472 3.220 -999.990 -999.990 1.075 ..P WKT 2010 05 21 06 39 55 31.3200 -97.3300 251.000 457.0 98.717 2.070 -999.990 -999.990 0.987 ..P WKT 2010 05 21 06 49 55 31.3200 -97.3300 251.000 30.0 116.577 2.380 -999.990 -999.990 1.166 ..P WKT 2010 05 21 06 54 55 31.3200 -97.3300 251.000 122.0 108.058 3.180 -999.990 -999.990 1.081 ..P WKT 2010 05 21 06 59 55 31.3200 -97.3300 251.000 457.0 101.600 3.730 -999.990 -999.990 1.016 ..P WKT 2010 05 21 07 04 55 31.3200 -97.3300 251.000 30.0 113.938 3.290 -999.990 -999.990 1.139 ..P WKT 2010 05 21 07 09 55 31.3200 -97.3300 251.000 122.0 105.970 3.100 -999.990 -999.990 1.060 ..P WKT 2010 05 21 07 14 55 31.3200 -97.3300 251.000 457.0 102.530 3.300 -999.990 -999.990 1.025 ..P WKT 2010 05 21 07 24 55 31.3200 -97.3300 251.000 30.0 113.875 2.800 -999.990 -999.990 1.139 ..P WKT 2010 05 21 07 29 55 31.3200 -97.3300 251.000 122.0 107.536 3.120 -999.990 -999.990 1.075 ..P WKT 2010 05 21 07 34 55 31.3200 -97.3300 251.000 457.0 98.730 2.490 -999.990 -999.990 0.987 ..P WKT 2010 05 21 07 39 55 31.3200 -97.3300 251.000 30.0 107.752 3.130 -999.990 -999.990 1.078 ..P WKT 2010 05 21 07 44 55 31.3200 -97.3300 251.000 122.0 106.351 2.250 -999.990 -999.990 1.064 ..P WKT 2010 05 21 07 49 55 31.3200 -97.3300 251.000 457.0 106.184 2.400 -999.990 -999.990 1.062 ..P WKT 2010 05 21 07 59 55 31.3200 -97.3300 251.000 30.0 108.768 3.000 -999.990 -999.990 1.088 ..P WKT 2010 05 21 08 04 55 31.3200 -97.3300 251.000 122.0 101.924 2.080 -999.990 -999.990 1.019 ..P WKT 2010 05 21 08 09 55 31.3200 -97.3300 251.000 457.0 96.040 1.670 -999.990 -999.990 0.960 ..P WKT 2010 05 21 08 14 55 31.3200 -97.3300 251.000 30.0 106.878 2.290 -999.990 -999.990 1.069 ..P WKT 2010 05 21 08 19 55 31.3200 -97.3300 251.000 122.0 93.046 2.240 -999.990 -999.990 0.930 ..P WKT 2010 05 21 08 24 55 31.3200 -97.3300 251.000 457.0 86.616 3.240 -999.990 -999.990 0.866 ..P WKT 2010 05 21 08 34 55 31.3200 -97.3300 251.000 30.0 98.539 2.990 -999.990 -999.990 0.985 ..P WKT 2010 05 21 08 39 55 31.3200 -97.3300 251.000 122.0 102.913 2.610 -999.990 -999.990 1.029 ..P WKT 2010 05 21 08 44 55 31.3200 -97.3300 251.000 457.0 95.506 2.140 -999.990 -999.990 0.955 ..P WKT 2010 05 21 08 49 55 31.3200 -97.3300 251.000 30.0 111.660 2.720 -999.990 -999.990 1.117 ..P WKT 2010 05 21 08 54 55 31.3200 -97.3300 251.000 122.0 100.692 3.530 -999.990 -999.990 1.007 ..P WKT 2010 05 21 08 59 55 31.3200 -97.3300 251.000 457.0 96.574 2.880 -999.990 -999.990 0.966 ..P WKT 2010 05 21 09 09 55 31.3200 -97.3300 251.000 30.0 106.688 3.770 -999.990 -999.990 1.067 ..P WKT 2010 05 21 09 14 55 31.3200 -97.3300 251.000 122.0 107.774 2.550 -999.990 -999.990 1.078 ..P WKT 2010 05 21 09 19 55 31.3200 -97.3300 251.000 457.0 98.454 3.270 -999.990 -999.990 0.985 ..P WKT 2010 05 21 09 24 55 31.3200 -97.3300 251.000 30.0 102.003 2.180 -999.990 -999.990 1.020 ..P WKT 2010 05 21 09 29 55 31.3200 -97.3300 251.000 122.0 99.804 1.960 -999.990 -999.990 0.998 ..P WKT 2010 05 21 09 34 55 31.3200 -97.3300 251.000 457.0 95.687 1.880 -999.990 -999.990 0.957 ..P WKT 2010 05 21 09 44 55 31.3200 -97.3300 251.000 30.0 93.832 3.540 -999.990 -999.990 0.938 ..P WKT 2010 05 21 09 49 55 31.3200 -97.3300 251.000 122.0 100.743 1.460 -999.990 -999.990 1.007 ..P WKT 2010 05 21 09 54 55 31.3200 -97.3300 251.000 457.0 96.980 1.620 -999.990 -999.990 0.970 ..P WKT 2010 05 21 09 59 55 31.3200 -97.3300 251.000 30.0 92.670 2.800 -999.990 -999.990 0.927 ..P WKT 2010 05 21 10 04 55 31.3200 -97.3300 251.000 122.0 102.043 2.010 -999.990 -999.990 1.020 ..P WKT 2010 05 21 10 09 55 31.3200 -97.3300 251.000 457.0 98.281 2.710 -999.990 -999.990 0.983 ..P WKT 2010 05 21 10 19 55 31.3200 -97.3300 251.000 30.0 92.537 2.560 -999.990 -999.990 0.925 ..P WKT 2010 05 21 10 24 55 31.3200 -97.3300 251.000 122.0 99.445 2.290 -999.990 -999.990 0.994 ..P WKT 2010 05 21 10 29 55 31.3200 -97.3300 251.000 457.0 100.608 2.300 -999.990 -999.990 1.006 ..P WKT 2010 05 21 10 34 55 31.3200 -97.3300 251.000 30.0 99.172 2.280 -999.990 -999.990 0.992 ..P WKT 2010 05 21 10 39 55 31.3200 -97.3300 251.000 122.0 98.010 2.030 -999.990 -999.990 0.980 ..P WKT 2010 05 21 10 44 55 31.3200 -97.3300 251.000 457.0 96.301 1.800 -999.990 -999.990 0.963 ..P WKT 2010 05 21 10 54 55 31.3200 -97.3300 251.000 30.0 96.361 1.900 -999.990 -999.990 0.964 ..P WKT 2010 05 21 10 59 55 31.3200 -97.3300 251.000 122.0 93.344 2.940 -999.990 -999.990 0.933 ..P WKT 2010 05 21 11 04 55 31.3200 -97.3300 251.000 457.0 99.349 2.770 -999.990 -999.990 0.993 ..P WKT 2010 05 21 11 09 55 31.3200 -97.3300 251.000 30.0 94.283 3.400 -999.990 -999.990 0.943 ..P WKT 2010 05 21 11 14 55 31.3200 -97.3300 251.000 122.0 94.684 3.030 -999.990 -999.990 0.947 ..P WKT 2010 05 21 11 19 55 31.3200 -97.3300 251.000 457.0 97.134 3.230 -999.990 -999.990 0.971 ..P WKT 2010 05 21 11 29 55 31.3200 -97.3300 251.000 30.0 90.540 3.310 -999.990 -999.990 0.905 ..P WKT 2010 05 21 11 34 55 31.3200 -97.3300 251.000 122.0 94.203 3.260 -999.990 -999.990 0.942 ..P WKT 2010 05 21 11 39 55 31.3200 -97.3300 251.000 457.0 98.685 3.200 -999.990 -999.990 0.987 ..P WKT 2010 05 21 11 44 55 31.3200 -97.3300 251.000 30.0 94.424 4.810 -999.990 -999.990 0.944 ..P WKT 2010 05 21 11 49 55 31.3200 -97.3300 251.000 122.0 100.818 3.110 -999.990 -999.990 1.008 ..P WKT 2010 05 21 12 09 55 31.3200 -97.3300 251.000 457.0 98.314 3.410 -999.990 -999.990 0.983 ..P WKT 2010 05 21 12 10 25 31.3200 -97.3300 251.000 457.0 96.868 3.450 -999.990 -999.990 0.969 ..P WKT 2010 05 21 12 10 55 31.3200 -97.3300 251.000 457.0 95.695 3.260 -999.990 -999.990 0.957 ..P WKT 2010 05 21 12 11 25 31.3200 -97.3300 251.000 457.0 98.346 4.460 -999.990 -999.990 0.983 ..P WKT 2010 05 21 12 11 55 31.3200 -97.3300 251.000 457.0 106.188 3.490 -999.990 -999.990 1.062 ..P WKT 2010 05 21 12 12 25 31.3200 -97.3300 251.000 457.0 99.825 4.040 -999.990 -999.990 0.998 ..P WKT 2010 05 21 12 12 55 31.3200 -97.3300 251.000 457.0 100.564 3.310 -999.990 -999.990 1.006 ..P WKT 2010 05 21 12 13 25 31.3200 -97.3300 251.000 457.0 99.118 3.110 -999.990 -999.990 0.991 ..P WKT 2010 05 21 12 13 55 31.3200 -97.3300 251.000 457.0 98.218 3.510 -999.990 -999.990 0.982 ..P WKT 2010 05 21 12 14 25 31.3200 -97.3300 251.000 457.0 100.596 5.500 -999.990 -999.990 1.006 ..P WKT 2010 05 21 12 14 55 31.3200 -97.3300 251.000 457.0 98.331 5.770 -999.990 -999.990 0.983 ..P WKT 2010 05 21 12 19 55 31.3200 -97.3300 251.000 30.0 103.538 4.630 -999.990 -999.990 1.035 ..P WKT 2010 05 21 12 24 55 31.3200 -97.3300 251.000 122.0 100.278 3.110 -999.990 -999.990 1.003 ..P WKT 2010 05 21 12 29 55 31.3200 -97.3300 251.000 457.0 101.661 3.070 -999.990 -999.990 1.017 ..P WKT 2010 05 21 12 34 55 31.3200 -97.3300 251.000 30.0 95.122 2.780 -999.990 -999.990 0.951 ..P WKT 2010 05 21 12 39 55 31.3200 -97.3300 251.000 122.0 99.237 2.760 -999.990 -999.990 0.992 ..P WKT 2010 05 21 12 44 55 31.3200 -97.3300 251.000 457.0 96.521 2.950 -999.990 -999.990 0.965 ..P WKT 2010 05 21 12 54 55 31.3200 -97.3300 251.000 30.0 101.927 2.700 -999.990 -999.990 1.019 ..P WKT 2010 05 21 12 59 55 31.3200 -97.3300 251.000 122.0 99.119 3.670 -999.990 -999.990 0.991 ..P WKT 2010 05 21 13 04 55 31.3200 -97.3300 251.000 457.0 96.311 3.210 -999.990 -999.990 0.963 ..P WKT 2010 05 21 13 09 55 31.3200 -97.3300 251.000 30.0 98.147 3.240 -999.990 -999.990 0.981 ..P WKT 2010 05 21 13 14 55 31.3200 -97.3300 251.000 122.0 101.897 3.470 -999.990 -999.990 1.019 ..P WKT 2010 05 21 13 19 55 31.3200 -97.3300 251.000 457.0 89.525 2.810 -999.990 -999.990 0.895 ..P WKT 2010 05 21 13 29 55 31.3200 -97.3300 251.000 30.0 97.063 2.720 -999.990 -999.990 0.971 ..P WKT 2010 05 21 13 34 55 31.3200 -97.3300 251.000 122.0 102.764 2.940 -999.990 -999.990 1.028 ..P WKT 2010 05 21 13 39 55 31.3200 -97.3300 251.000 457.0 100.541 3.830 -999.990 -999.990 1.005 ..P WKT 2010 05 21 13 44 55 31.3200 -97.3300 251.000 30.0 105.423 3.510 -999.990 -999.990 1.054 ..P WKT 2010 05 21 13 49 55 31.3200 -97.3300 251.000 122.0 108.665 3.460 -999.990 -999.990 1.087 ..P WKT 2010 05 21 13 54 55 31.3200 -97.3300 251.000 457.0 101.250 3.440 -999.990 -999.990 1.012 ..P WKT 2010 05 21 14 04 55 31.3200 -97.3300 251.000 30.0 106.408 3.990 -999.990 -999.990 1.064 ..P WKT 2010 05 21 14 09 55 31.3200 -97.3300 251.000 122.0 104.633 4.890 -999.990 -999.990 1.046 ..P WKT 2010 05 21 14 14 55 31.3200 -97.3300 251.000 457.0 97.257 3.310 -999.990 -999.990 0.973 ..P WKT 2010 05 21 14 19 55 31.3200 -97.3300 251.000 30.0 98.352 3.880 -999.990 -999.990 0.984 ..P WKT 2010 05 21 14 24 55 31.3200 -97.3300 251.000 122.0 101.224 3.530 -999.990 -999.990 1.012 ..P WKT 2010 05 21 14 29 55 31.3200 -97.3300 251.000 457.0 98.083 3.760 -999.990 -999.990 0.981 ..P WKT 2010 05 21 14 39 55 31.3200 -97.3300 251.000 30.0 101.543 3.020 -999.990 -999.990 1.015 ..P WKT 2010 05 21 14 44 55 31.3200 -97.3300 251.000 122.0 101.174 2.800 -999.990 -999.990 1.012 ..P WKT 2010 05 21 14 49 55 31.3200 -97.3300 251.000 457.0 101.625 2.640 -999.990 -999.990 1.016 ..P WKT 2010 05 21 14 54 55 31.3200 -97.3300 251.000 30.0 100.163 4.080 -999.990 -999.990 1.002 ..P WKT 2010 05 21 14 59 55 31.3200 -97.3300 251.000 122.0 104.031 2.510 -999.990 -999.990 1.040 ..P WKT 2010 05 21 15 04 55 31.3200 -97.3300 251.000 457.0 101.202 3.380 -999.990 -999.990 1.012 ..P WKT 2010 05 21 15 14 55 31.3200 -97.3300 251.000 30.0 97.125 2.560 -999.990 -999.990 0.971 ..P WKT 2010 05 21 15 19 55 31.3200 -97.3300 251.000 122.0 102.165 3.330 -999.990 -999.990 1.022 ..P WKT 2010 05 21 15 24 55 31.3200 -97.3300 251.000 457.0 93.673 3.590 -999.990 -999.990 0.937 ..P WKT 2010 05 21 15 29 55 31.3200 -97.3300 251.000 30.0 93.929 3.870 -999.990 -999.990 0.939 ..P WKT 2010 05 21 15 34 55 31.3200 -97.3300 251.000 122.0 97.466 4.230 -999.990 -999.990 0.975 ..P WKT 2010 05 21 15 39 55 31.3200 -97.3300 251.000 457.0 92.664 5.010 -999.990 -999.990 0.927 ..P WKT 2010 05 21 15 49 55 31.3200 -97.3300 251.000 30.0 93.702 5.230 -999.990 -999.990 0.937 ..P WKT 2010 05 21 15 54 55 31.3200 -97.3300 251.000 122.0 95.032 4.520 -999.990 -999.990 0.950 ..P WKT 2010 05 21 15 59 55 31.3200 -97.3300 251.000 457.0 90.484 4.050 -999.990 -999.990 0.905 ..P WKT 2010 05 21 16 04 55 31.3200 -97.3300 251.000 30.0 97.692 4.520 -999.990 -999.990 0.977 ..P WKT 2010 05 21 16 09 55 31.3200 -97.3300 251.000 122.0 100.253 2.590 -999.990 -999.990 1.003 ..P WKT 2010 05 21 16 14 55 31.3200 -97.3300 251.000 457.0 95.431 2.920 -999.990 -999.990 0.954 ..P WKT 2010 05 21 16 24 55 31.3200 -97.3300 251.000 30.0 100.025 1.800 -999.990 -999.990 1.000 ..P WKT 2010 05 21 16 29 55 31.3200 -97.3300 251.000 122.0 99.324 3.690 -999.990 -999.990 0.993 ..P WKT 2010 05 21 16 34 55 31.3200 -97.3300 251.000 457.0 95.888 1.920 -999.990 -999.990 0.959 ..P WKT 2010 05 21 16 39 55 31.3200 -97.3300 251.000 30.0 99.563 1.760 -999.990 -999.990 0.996 ..P WKT 2010 05 21 16 44 55 31.3200 -97.3300 251.000 122.0 106.245 2.270 -999.990 -999.990 1.062 ..P WKT 2010 05 21 16 49 55 31.3200 -97.3300 251.000 457.0 102.809 2.140 -999.990 -999.990 1.028 ..P WKT 2010 05 21 17 04 55 31.3200 -97.3300 251.000 30.0 97.873 2.760 -999.990 -999.990 0.979 ..P WKT 2010 05 21 17 09 55 31.3200 -97.3300 251.000 122.0 103.141 3.640 -999.990 -999.990 1.031 ..P WKT 2010 05 21 17 14 55 31.3200 -97.3300 251.000 457.0 96.100 2.250 -999.990 -999.990 0.961 ..P WKT 2010 05 21 17 19 55 31.3200 -97.3300 251.000 30.0 101.367 3.640 -999.990 -999.990 1.014 ..P WKT 2010 05 21 17 24 55 31.3200 -97.3300 251.000 122.0 104.993 3.690 -999.990 -999.990 1.050 ..P WKT 2010 05 21 17 29 55 31.3200 -97.3300 251.000 457.0 106.158 3.350 -999.990 -999.990 1.062 ..P WKT 2010 05 21 17 39 55 31.3200 -97.3300 251.000 30.0 108.926 3.320 -999.990 -999.990 1.089 ..P WKT 2010 05 21 17 44 55 31.3200 -97.3300 251.000 122.0 114.908 2.680 -999.990 -999.990 1.149 ..P WKT 2010 05 21 17 49 55 31.3200 -97.3300 251.000 457.0 105.844 4.170 -999.990 -999.990 1.058 ..P WKT 2010 05 21 17 54 55 31.3200 -97.3300 251.000 30.0 113.193 2.810 -999.990 -999.990 1.132 ..P WKT 2010 05 21 17 59 55 31.3200 -97.3300 251.000 122.0 111.515 2.130 -999.990 -999.990 1.115 ..P WKT 2010 05 21 18 04 55 31.3200 -97.3300 251.000 457.0 107.512 2.680 -999.990 -999.990 1.075 ..P WKT 2010 05 21 18 14 55 31.3200 -97.3300 251.000 30.0 106.168 3.500 -999.990 -999.990 1.062 ..P WKT 2010 05 21 18 19 55 31.3200 -97.3300 251.000 122.0 111.290 2.840 -999.990 -999.990 1.113 ..P WKT 2010 05 21 18 24 55 31.3200 -97.3300 251.000 457.0 107.384 2.880 -999.990 -999.990 1.074 ..P WKT 2010 05 21 18 29 55 31.3200 -97.3300 251.000 30.0 104.983 2.300 -999.990 -999.990 1.050 ..P WKT 2010 05 21 18 34 55 31.3200 -97.3300 251.000 122.0 106.275 2.530 -999.990 -999.990 1.063 ..P WKT 2010 05 21 18 39 55 31.3200 -97.3300 251.000 457.0 97.034 2.360 -999.990 -999.990 0.970 ..P WKT 2010 05 21 18 49 55 31.3200 -97.3300 251.000 30.0 106.321 2.990 -999.990 -999.990 1.063 ..P WKT 2010 05 21 18 54 55 31.3200 -97.3300 251.000 122.0 108.297 3.170 -999.990 -999.990 1.083 ..P WKT 2010 05 21 18 59 55 31.3200 -97.3300 251.000 457.0 105.895 2.580 -999.990 -999.990 1.059 ..P WKT 2010 05 21 19 04 55 31.3200 -97.3300 251.000 30.0 107.735 3.310 -999.990 -999.990 1.077 ..P WKT 2010 05 21 19 09 55 31.3200 -97.3300 251.000 122.0 108.343 3.260 -999.990 -999.990 1.083 ..P WKT 2010 05 21 19 14 55 31.3200 -97.3300 251.000 457.0 100.331 2.970 -999.990 -999.990 1.003 ..P WKT 2010 05 21 19 24 55 31.3200 -97.3300 251.000 30.0 102.994 2.950 -999.990 -999.990 1.030 ..P WKT 2010 05 21 19 29 55 31.3200 -97.3300 251.000 122.0 105.459 2.960 -999.990 -999.990 1.055 ..P WKT 2010 05 21 19 34 55 31.3200 -97.3300 251.000 457.0 102.451 3.560 -999.990 -999.990 1.025 ..P WKT 2010 05 21 19 39 55 31.3200 -97.3300 251.000 30.0 104.232 2.120 -999.990 -999.990 1.042 ..P WKT 2010 05 21 19 44 55 31.3200 -97.3300 251.000 122.0 100.265 2.750 -999.990 -999.990 1.003 ..P WKT 2010 05 21 19 49 55 31.3200 -97.3300 251.000 457.0 102.868 1.620 -999.990 -999.990 1.029 ..P WKT 2010 05 21 19 59 55 31.3200 -97.3300 251.000 30.0 107.212 2.980 -999.990 -999.990 1.072 ..P WKT 2010 05 21 20 04 55 31.3200 -97.3300 251.000 122.0 112.512 2.830 -999.990 -999.990 1.125 ..P WKT 2010 05 21 20 09 55 31.3200 -97.3300 251.000 457.0 104.265 2.650 -999.990 -999.990 1.043 ..P WKT 2010 05 21 20 14 55 31.3200 -97.3300 251.000 30.0 104.228 2.530 -999.990 -999.990 1.042 ..P WKT 2010 05 21 20 19 55 31.3200 -97.3300 251.000 122.0 104.191 4.100 -999.990 -999.990 1.042 ..P WKT 2010 05 21 20 24 55 31.3200 -97.3300 251.000 457.0 99.500 3.100 -999.990 -999.990 0.995 ..P WKT 2010 05 21 20 34 55 31.3200 -97.3300 251.000 30.0 109.789 3.060 -999.990 -999.990 1.098 ..P WKT 2010 05 21 20 39 55 31.3200 -97.3300 251.000 122.0 111.630 5.170 -999.990 -999.990 1.116 ..P WKT 2010 05 21 20 44 55 31.3200 -97.3300 251.000 457.0 103.068 2.710 -999.990 -999.990 1.031 ..P WKT 2010 05 21 20 49 55 31.3200 -97.3300 251.000 30.0 105.729 2.520 -999.990 -999.990 1.057 ..P WKT 2010 05 21 20 54 55 31.3200 -97.3300 251.000 122.0 103.463 3.590 -999.990 -999.990 1.035 ..P WKT 2010 05 21 20 59 55 31.3200 -97.3300 251.000 457.0 105.850 3.310 -999.990 -999.990 1.058 ..P WKT 2010 05 21 21 09 55 31.3200 -97.3300 251.000 30.0 110.901 2.000 -999.990 -999.990 1.109 ..P WKT 2010 05 21 21 14 55 31.3200 -97.3300 251.000 122.0 118.764 2.090 -999.990 -999.990 1.188 ..P WKT 2010 05 21 21 19 55 31.3200 -97.3300 251.000 457.0 108.285 2.420 -999.990 -999.990 1.083 ..P WKT 2010 05 21 21 24 55 31.3200 -97.3300 251.000 30.0 107.113 2.530 -999.990 -999.990 1.071 ..P WKT 2010 05 21 21 29 55 31.3200 -97.3300 251.000 122.0 115.252 2.530 -999.990 -999.990 1.153 ..P WKT 2010 05 21 21 34 55 31.3200 -97.3300 251.000 457.0 105.045 3.620 -999.990 -999.990 1.050 ..P WKT 2010 05 21 21 44 55 31.3200 -97.3300 251.000 30.0 110.272 3.210 -999.990 -999.990 1.103 ..P WKT 2010 05 21 21 49 55 31.3200 -97.3300 251.000 122.0 108.455 2.870 -999.990 -999.990 1.085 ..P WKT 2010 05 21 21 54 55 31.3200 -97.3300 251.000 457.0 113.210 2.510 -999.990 -999.990 1.132 ..P WKT 2010 05 21 21 59 55 31.3200 -97.3300 251.000 30.0 110.846 2.330 -999.990 -999.990 1.108 ..P WKT 2010 05 21 22 04 55 31.3200 -97.3300 251.000 122.0 115.053 2.930 -999.990 -999.990 1.151 ..P WKT 2010 05 21 22 09 55 31.3200 -97.3300 251.000 457.0 114.332 3.080 -999.990 -999.990 1.143 ..P WKT 2010 05 21 22 19 55 31.3200 -97.3300 251.000 30.0 108.234 3.430 -999.990 -999.990 1.082 ..P WKT 2010 05 21 22 24 55 31.3200 -97.3300 251.000 122.0 117.234 2.630 -999.990 -999.990 1.172 ..P WKT 2010 05 21 22 29 55 31.3200 -97.3300 251.000 457.0 108.571 2.790 -999.990 -999.990 1.086 ..P WKT 2010 05 21 22 34 55 31.3200 -97.3300 251.000 30.0 106.206 3.400 -999.990 -999.990 1.062 ..P WKT 2010 05 21 22 39 55 31.3200 -97.3300 251.000 122.0 114.797 3.140 -999.990 -999.990 1.148 ..P WKT 2010 05 21 22 44 55 31.3200 -97.3300 251.000 457.0 108.323 2.130 -999.990 -999.990 1.083 ..P WKT 2010 05 21 22 54 55 31.3200 -97.3300 251.000 30.0 114.686 2.840 -999.990 -999.990 1.147 ..P WKT 2010 05 21 22 59 55 31.3200 -97.3300 251.000 122.0 115.745 3.130 -999.990 -999.990 1.157 ..P WKT 2010 05 21 23 04 55 31.3200 -97.3300 251.000 457.0 115.571 6.360 -999.990 -999.990 1.156 ..P WKT 2010 05 21 23 09 55 31.3200 -97.3300 251.000 30.0 120.602 8.060 -999.990 -999.990 1.206 ..P WKT 2010 05 21 23 14 55 31.3200 -97.3300 251.000 122.0 120.155 6.910 -999.990 -999.990 1.202 ..P WKT 2010 05 21 23 19 55 31.3200 -97.3300 251.000 457.0 117.515 4.150 -999.990 -999.990 1.175 ..P WKT 2010 05 21 23 29 55 31.3200 -97.3300 251.000 30.0 117.824 4.130 -999.990 -999.990 1.178 ..P WKT 2010 05 21 23 34 55 31.3200 -97.3300 251.000 122.0 120.497 6.170 -999.990 -999.990 1.205 ..P WKT 2010 05 21 23 39 55 31.3200 -97.3300 251.000 457.0 113.994 7.860 -999.990 -999.990 1.140 ..P WKT 2010 05 21 23 44 55 31.3200 -97.3300 251.000 30.0 100.778 8.050 -999.990 -999.990 1.008 ..P WKT 2010 05 21 23 49 55 31.3200 -97.3300 251.000 122.0 115.094 4.650 -999.990 -999.990 1.151 ..P WKT 2010 05 22 00 09 55 31.3200 -97.3300 251.000 457.0 110.967 3.080 -999.990 -999.990 1.110 ..P WKT 2010 05 22 00 10 25 31.3200 -97.3300 251.000 457.0 109.093 2.910 -999.990 -999.990 1.091 ..P WKT 2010 05 22 00 10 55 31.3200 -97.3300 251.000 457.0 115.440 3.070 -999.990 -999.990 1.154 ..P WKT 2010 05 22 00 11 25 31.3200 -97.3300 251.000 457.0 112.744 2.890 -999.990 -999.990 1.127 ..P WKT 2010 05 22 00 11 55 31.3200 -97.3300 251.000 457.0 111.143 3.460 -999.990 -999.990 1.111 ..P WKT 2010 05 22 00 12 25 31.3200 -97.3300 251.000 457.0 112.284 3.690 -999.990 -999.990 1.123 ..P WKT 2010 05 22 00 12 55 31.3200 -97.3300 251.000 457.0 115.069 2.800 -999.990 -999.990 1.151 ..P WKT 2010 05 22 00 13 25 31.3200 -97.3300 251.000 457.0 110.453 3.220 -999.990 -999.990 1.105 ..P WKT 2010 05 22 00 13 55 31.3200 -97.3300 251.000 457.0 112.142 3.210 -999.990 -999.990 1.121 ..P WKT 2010 05 22 00 14 25 31.3200 -97.3300 251.000 457.0 114.926 3.210 -999.990 -999.990 1.149 ..P WKT 2010 05 22 00 14 55 31.3200 -97.3300 251.000 457.0 119.356 4.910 -999.990 -999.990 1.194 ..P WKT 2010 05 22 00 19 55 31.3200 -97.3300 251.000 30.0 116.782 2.910 -999.990 -999.990 1.168 ..P WKT 2010 05 22 00 24 55 31.3200 -97.3300 251.000 122.0 123.254 3.850 -999.990 -999.990 1.233 ..P WKT 2010 05 22 00 29 55 31.3200 -97.3300 251.000 457.0 112.729 4.780 -999.990 -999.990 1.127 ..P WKT 2010 05 22 00 34 55 31.3200 -97.3300 251.000 30.0 106.862 4.190 -999.990 -999.990 1.069 ..P WKT 2010 05 22 00 39 55 31.3200 -97.3300 251.000 122.0 114.982 4.560 -999.990 -999.990 1.150 ..P WKT 2010 05 22 00 44 55 31.3200 -97.3300 251.000 457.0 108.017 2.270 -999.990 -999.990 1.080 ..P WKT 2010 05 22 00 54 55 31.3200 -97.3300 251.000 30.0 110.861 2.570 -999.990 -999.990 1.109 ..P WKT 2010 05 22 00 59 55 31.3200 -97.3300 251.000 122.0 110.249 3.920 -999.990 -999.990 1.102 ..P WKT 2010 05 22 01 04 55 31.3200 -97.3300 251.000 457.0 106.067 4.920 -999.990 -999.990 1.061 ..P WKT 2010 05 22 01 09 55 31.3200 -97.3300 251.000 30.0 105.453 3.920 -999.990 -999.990 1.055 ..P WKT 2010 05 22 01 14 55 31.3200 -97.3300 251.000 122.0 110.055 2.840 -999.990 -999.990 1.101 ..P WKT 2010 05 22 01 19 55 31.3200 -97.3300 251.000 457.0 115.757 3.070 -999.990 -999.990 1.158 ..P WKT 2010 05 22 01 29 55 31.3200 -97.3300 251.000 30.0 116.100 3.240 -999.990 -999.990 1.161 ..P WKT 2010 05 22 01 34 55 31.3200 -97.3300 251.000 122.0 115.408 4.750 -999.990 -999.990 1.154 ..P WKT 2010 05 22 01 39 55 31.3200 -97.3300 251.000 457.0 108.947 3.100 -999.990 -999.990 1.089 ..P WKT 2010 05 22 01 44 55 31.3200 -97.3300 251.000 30.0 112.101 3.590 -999.990 -999.990 1.121 ..P WKT 2010 05 22 01 49 55 31.3200 -97.3300 251.000 122.0 108.111 4.100 -999.990 -999.990 1.081 ..P WKT 2010 05 22 01 54 55 31.3200 -97.3300 251.000 457.0 115.113 2.650 -999.990 -999.990 1.151 ..P WKT 2010 05 22 02 04 55 31.3200 -97.3300 251.000 30.0 123.468 4.420 -999.990 -999.990 1.235 ..P WKT 2010 05 22 02 09 55 31.3200 -97.3300 251.000 122.0 118.358 3.990 -999.990 -999.990 1.184 ..P WKT 2010 05 22 02 14 55 31.3200 -97.3300 251.000 457.0 107.334 3.600 -999.990 -999.990 1.073 ..P WKT 2010 05 22 02 19 55 31.3200 -97.3300 251.000 30.0 118.859 3.380 -999.990 -999.990 1.189 ..P WKT 2010 05 22 02 24 55 31.3200 -97.3300 251.000 122.0 106.181 3.990 -999.990 -999.990 1.062 ..P WKT 2010 05 22 02 29 55 31.3200 -97.3300 251.000 457.0 104.505 4.360 -999.990 -999.990 1.045 ..P WKT 2010 05 22 02 39 55 31.3200 -97.3300 251.000 30.0 113.769 4.210 -999.990 -999.990 1.138 ..P WKT 2010 05 22 02 44 55 31.3200 -97.3300 251.000 122.0 102.834 4.600 -999.990 -999.990 1.028 ..P WKT 2010 05 22 02 49 55 31.3200 -97.3300 251.000 457.0 104.557 4.190 -999.990 -999.990 1.046 ..P WKT 2010 05 22 02 54 55 31.3200 -97.3300 251.000 30.0 99.398 5.780 -999.990 -999.990 0.994 ..P WKT 2010 05 22 02 59 55 31.3200 -97.3300 251.000 122.0 101.259 3.900 -999.990 -999.990 1.013 ..P WKT 2010 05 22 03 04 55 31.3200 -97.3300 251.000 457.0 100.367 3.850 -999.990 -999.990 1.004 ..P WKT 2010 05 22 03 14 55 31.3200 -97.3300 251.000 30.0 104.799 3.320 -999.990 -999.990 1.048 ..P WKT 2010 05 22 03 19 55 31.3200 -97.3300 251.000 122.0 109.850 2.990 -999.990 -999.990 1.099 ..P WKT 2010 05 22 03 24 55 31.3200 -97.3300 251.000 457.0 107.463 3.970 -999.990 -999.990 1.075 ..P WKT 2010 05 22 03 29 55 31.3200 -97.3300 251.000 30.0 105.351 3.430 -999.990 -999.990 1.054 ..P WKT 2010 05 22 03 34 55 31.3200 -97.3300 251.000 122.0 110.542 2.790 -999.990 -999.990 1.105 ..P WKT 2010 05 22 03 39 55 31.3200 -97.3300 251.000 457.0 119.456 2.280 -999.990 -999.990 1.195 ..P WKT 2010 05 22 03 49 55 31.3200 -97.3300 251.000 30.0 108.220 1.850 -999.990 -999.990 1.082 ..P WKT 2010 05 22 03 54 55 31.3200 -97.3300 251.000 122.0 113.572 2.530 -999.990 -999.990 1.136 ..P WKT 2010 05 22 03 59 55 31.3200 -97.3300 251.000 457.0 109.134 3.560 -999.990 -999.990 1.091 ..P WKT 2010 05 22 04 04 55 31.3200 -97.3300 251.000 30.0 110.902 2.340 -999.990 -999.990 1.109 ..P WKT 2010 05 22 04 09 55 31.3200 -97.3300 251.000 122.0 121.774 1.920 -999.990 -999.990 1.218 ..P WKT 2010 05 22 04 14 55 31.3200 -97.3300 251.000 457.0 100.918 1.800 -999.990 -999.990 1.009 ..P WKT 2010 05 22 04 24 55 31.3200 -97.3300 251.000 30.0 108.888 2.420 -999.990 -999.990 1.089 ..P WKT 2010 05 22 04 29 55 31.3200 -97.3300 251.000 122.0 115.369 2.820 -999.990 -999.990 1.154 ..P WKT 2010 05 22 04 34 55 31.3200 -97.3300 251.000 457.0 109.428 5.060 -999.990 -999.990 1.094 ..P WKT 2010 05 22 04 39 55 31.3200 -97.3300 251.000 30.0 114.806 1.900 -999.990 -999.990 1.148 ..P WKT 2010 05 22 04 44 55 31.3200 -97.3300 251.000 122.0 106.931 2.420 -999.990 -999.990 1.069 ..P WKT 2010 05 22 04 49 55 31.3200 -97.3300 251.000 457.0 104.024 1.880 -999.990 -999.990 1.040 ..P WKT 2010 05 22 05 04 55 31.3200 -97.3300 251.000 30.0 116.340 3.280 -999.990 -999.990 1.163 ..P WKT 2010 05 22 05 09 55 31.3200 -97.3300 251.000 122.0 116.078 3.120 -999.990 -999.990 1.161 ..P WKT 2010 05 22 05 14 55 31.3200 -97.3300 251.000 457.0 102.826 4.680 -999.990 -999.990 1.028 ..P WKT 2010 05 22 05 19 55 31.3200 -97.3300 251.000 30.0 120.808 4.420 -999.990 -999.990 1.208 ..P WKT 2010 05 22 05 24 55 31.3200 -97.3300 251.000 122.0 114.187 3.330 -999.990 -999.990 1.142 ..P WKT 2010 05 22 05 29 55 31.3200 -97.3300 251.000 457.0 102.311 2.460 -999.990 -999.990 1.023 ..P WKT 2010 05 22 05 39 55 31.3200 -97.3300 251.000 30.0 111.841 3.220 -999.990 -999.990 1.118 ..P WKT 2010 05 22 05 44 55 31.3200 -97.3300 251.000 122.0 110.016 4.000 -999.990 -999.990 1.100 ..P WKT 2010 05 22 05 49 55 31.3200 -97.3300 251.000 457.0 95.189 4.370 -999.990 -999.990 0.952 ..P WKT 2010 05 22 05 54 55 31.3200 -97.3300 251.000 30.0 105.400 5.190 -999.990 -999.990 1.054 ..P WKT 2010 05 22 05 59 55 31.3200 -97.3300 251.000 122.0 108.971 3.780 -999.990 -999.990 1.090 ..P WKT 2010 05 22 06 04 55 31.3200 -97.3300 251.000 457.0 91.922 2.580 -999.990 -999.990 0.919 ..P WKT 2010 05 22 06 14 55 31.3200 -97.3300 251.000 30.0 101.893 3.240 -999.990 -999.990 1.019 ..P WKT 2010 05 22 06 19 55 31.3200 -97.3300 251.000 122.0 103.587 4.590 -999.990 -999.990 1.036 ..P WKT 2010 05 22 06 24 55 31.3200 -97.3300 251.000 457.0 91.295 4.840 -999.990 -999.990 0.913 ..P WKT 2010 05 22 06 29 55 31.3200 -97.3300 251.000 30.0 96.174 4.410 -999.990 -999.990 0.962 ..P WKT 2010 05 22 06 34 55 31.3200 -97.3300 251.000 122.0 98.284 4.150 -999.990 -999.990 0.983 ..P WKT 2010 05 22 06 39 55 31.3200 -97.3300 251.000 457.0 93.605 2.340 -999.990 -999.990 0.936 ..P WKT 2010 05 22 06 49 55 31.3200 -97.3300 251.000 30.0 101.151 2.590 -999.990 -999.990 1.012 ..P WKT 2010 05 22 06 54 55 31.3200 -97.3300 251.000 122.0 105.341 2.820 -999.990 -999.990 1.053 ..P WKT 2010 05 22 06 59 55 31.3200 -97.3300 251.000 457.0 96.504 3.420 -999.990 -999.990 0.965 ..P WKT 2010 05 22 07 04 55 31.3200 -97.3300 251.000 30.0 106.239 3.050 -999.990 -999.990 1.062 ..P WKT 2010 05 22 07 09 55 31.3200 -97.3300 251.000 122.0 103.639 4.010 -999.990 -999.990 1.036 ..P WKT 2010 05 22 07 14 55 31.3200 -97.3300 251.000 457.0 87.863 4.180 -999.990 -999.990 0.879 ..P WKT 2010 05 22 07 24 55 31.3200 -97.3300 251.000 30.0 93.413 3.120 -999.990 -999.990 0.934 ..P WKT 2010 05 22 07 29 55 31.3200 -97.3300 251.000 122.0 98.934 4.950 -999.990 -999.990 0.989 ..P WKT 2010 05 22 07 34 55 31.3200 -97.3300 251.000 457.0 91.831 2.610 -999.990 -999.990 0.918 ..P WKT 2010 05 22 07 39 55 31.3200 -97.3300 251.000 30.0 100.267 2.270 -999.990 -999.990 1.003 ..P WKT 2010 05 22 07 44 55 31.3200 -97.3300 251.000 122.0 99.963 2.400 -999.990 -999.990 1.000 ..P WKT 2010 05 22 07 49 55 31.3200 -97.3300 251.000 457.0 95.771 2.920 -999.990 -999.990 0.958 ..P WKT 2010 05 22 07 59 55 31.3200 -97.3300 251.000 30.0 96.073 1.880 -999.990 -999.990 0.961 ..P WKT 2010 05 22 08 04 55 31.3200 -97.3300 251.000 122.0 104.457 1.990 -999.990 -999.990 1.045 ..P WKT 2010 05 22 08 09 55 31.3200 -97.3300 251.000 457.0 99.510 3.410 -999.990 -999.990 0.995 ..P WKT 2010 05 22 08 14 55 31.3200 -97.3300 251.000 30.0 103.729 4.020 -999.990 -999.990 1.037 ..P WKT 2010 05 22 08 19 55 31.3200 -97.3300 251.000 122.0 104.893 2.780 -999.990 -999.990 1.049 ..P WKT 2010 05 22 08 24 55 31.3200 -97.3300 251.000 457.0 93.553 3.300 -999.990 -999.990 0.936 ..P WKT 2010 05 22 08 34 55 31.3200 -97.3300 251.000 30.0 98.500 2.120 -999.990 -999.990 0.985 ..P WKT 2010 05 22 08 39 55 31.3200 -97.3300 251.000 122.0 102.564 2.830 -999.990 -999.990 1.026 ..P WKT 2010 05 22 08 44 55 31.3200 -97.3300 251.000 457.0 89.389 2.990 -999.990 -999.990 0.894 ..P WKT 2010 05 22 08 49 55 31.3200 -97.3300 251.000 30.0 88.447 3.020 -999.990 -999.990 0.884 ..P WKT 2010 05 22 08 54 55 31.3200 -97.3300 251.000 122.0 94.735 2.500 -999.990 -999.990 0.947 ..P WKT 2010 05 22 08 59 55 31.3200 -97.3300 251.000 457.0 88.230 3.530 -999.990 -999.990 0.882 ..P WKT 2010 05 22 09 09 55 31.3200 -97.3300 251.000 30.0 93.181 3.200 -999.990 -999.990 0.932 ..P WKT 2010 05 22 09 14 55 31.3200 -97.3300 251.000 122.0 100.190 2.820 -999.990 -999.990 1.002 ..P WKT 2010 05 22 09 19 55 31.3200 -97.3300 251.000 457.0 87.717 3.070 -999.990 -999.990 0.877 ..P WKT 2010 05 22 09 24 55 31.3200 -97.3300 251.000 30.0 96.953 3.420 -999.990 -999.990 0.970 ..P WKT 2010 05 22 09 29 55 31.3200 -97.3300 251.000 122.0 91.995 2.240 -999.990 -999.990 0.920 ..P WKT 2010 05 22 09 34 55 31.3200 -97.3300 251.000 457.0 94.552 2.180 -999.990 -999.990 0.946 ..P WKT 2010 05 22 09 44 55 31.3200 -97.3300 251.000 30.0 93.023 2.310 -999.990 -999.990 0.930 ..P WKT 2010 05 22 09 49 55 31.3200 -97.3300 251.000 122.0 92.557 4.090 -999.990 -999.990 0.926 ..P WKT 2010 05 22 09 54 55 31.3200 -97.3300 251.000 457.0 97.942 2.630 -999.990 -999.990 0.979 ..P WKT 2010 05 22 09 59 55 31.3200 -97.3300 251.000 30.0 91.486 3.040 -999.990 -999.990 0.915 ..P WKT 2010 05 22 10 04 55 31.3200 -97.3300 251.000 122.0 97.847 3.230 -999.990 -999.990 0.978 ..P WKT 2010 05 22 10 09 55 31.3200 -97.3300 251.000 457.0 100.169 4.920 -999.990 -999.990 1.002 ..P WKT 2010 05 22 10 19 55 31.3200 -97.3300 251.000 30.0 93.742 3.810 -999.990 -999.990 0.937 ..P WKT 2010 05 22 10 24 55 31.3200 -97.3300 251.000 122.0 99.072 3.930 -999.990 -999.990 0.991 ..P WKT 2010 05 22 10 29 55 31.3200 -97.3300 251.000 457.0 94.084 3.160 -999.990 -999.990 0.941 ..P WKT 2010 05 22 10 34 55 31.3200 -97.3300 251.000 30.0 96.068 4.110 -999.990 -999.990 0.961 ..P WKT 2010 05 22 10 39 55 31.3200 -97.3300 251.000 122.0 96.937 2.630 -999.990 -999.990 0.969 ..P WKT 2010 05 22 10 44 55 31.3200 -97.3300 251.000 457.0 95.295 2.690 -999.990 -999.990 0.953 ..P WKT 2010 05 22 10 54 55 31.3200 -97.3300 251.000 30.0 92.210 3.270 -999.990 -999.990 0.922 ..P WKT 2010 05 22 10 59 55 31.3200 -97.3300 251.000 122.0 95.510 2.690 -999.990 -999.990 0.955 ..P WKT 2010 05 22 11 04 55 31.3200 -97.3300 251.000 457.0 92.671 2.320 -999.990 -999.990 0.927 ..P WKT 2010 05 22 11 09 55 31.3200 -97.3300 251.000 30.0 90.947 3.810 -999.990 -999.990 0.909 ..P WKT 2010 05 22 11 14 55 31.3200 -97.3300 251.000 122.0 98.858 2.240 -999.990 -999.990 0.989 ..P WKT 2010 05 22 11 19 55 31.3200 -97.3300 251.000 457.0 99.928 3.190 -999.990 -999.990 0.999 ..P WKT 2010 05 22 11 29 55 31.3200 -97.3300 251.000 30.0 97.152 3.180 -999.990 -999.990 0.972 ..P WKT 2010 05 22 11 34 55 31.3200 -97.3300 251.000 122.0 96.937 3.080 -999.990 -999.990 0.969 ..P WKT 2010 05 22 11 39 55 31.3200 -97.3300 251.000 457.0 88.339 2.380 -999.990 -999.990 0.883 ..P WKT 2010 05 22 11 44 55 31.3200 -97.3300 251.000 30.0 97.066 3.800 -999.990 -999.990 0.971 ..P WKT 2010 05 22 11 49 55 31.3200 -97.3300 251.000 122.0 97.970 3.450 -999.990 -999.990 0.980 ..P WKT 2010 05 22 12 09 55 31.3200 -97.3300 251.000 457.0 88.930 3.240 -999.990 -999.990 0.889 ..P WKT 2010 05 22 12 10 25 31.3200 -97.3300 251.000 457.0 87.604 3.230 -999.990 -999.990 0.876 ..P WKT 2010 05 22 12 10 55 31.3200 -97.3300 251.000 457.0 91.030 3.170 -999.990 -999.990 0.910 ..P WKT 2010 05 22 12 11 25 31.3200 -97.3300 251.000 457.0 92.778 3.250 -999.990 -999.990 0.928 ..P WKT 2010 05 22 12 11 55 31.3200 -97.3300 251.000 457.0 91.451 2.990 -999.990 -999.990 0.915 ..P WKT 2010 05 22 12 12 25 31.3200 -97.3300 251.000 457.0 89.566 3.090 -999.990 -999.990 0.896 ..P WKT 2010 05 22 12 12 55 31.3200 -97.3300 251.000 457.0 94.388 3.100 -999.990 -999.990 0.944 ..P WKT 2010 05 22 12 13 25 31.3200 -97.3300 251.000 457.0 90.546 3.090 -999.990 -999.990 0.905 ..P WKT 2010 05 22 12 13 55 31.3200 -97.3300 251.000 457.0 94.251 3.700 -999.990 -999.990 0.943 ..P WKT 2010 05 22 12 14 25 31.3200 -97.3300 251.000 457.0 91.247 2.850 -999.990 -999.990 0.912 ..P WKT 2010 05 22 12 14 55 31.3200 -97.3300 251.000 457.0 97.747 3.640 -999.990 -999.990 0.977 ..P WKT 2010 05 22 12 19 55 31.3200 -97.3300 251.000 30.0 97.059 2.880 -999.990 -999.990 0.971 ..P WKT 2010 05 22 12 24 55 31.3200 -97.3300 251.000 122.0 101.401 3.290 -999.990 -999.990 1.014 ..P WKT 2010 05 22 12 29 55 31.3200 -97.3300 251.000 457.0 99.875 4.990 -999.990 -999.990 0.999 ..P WKT 2010 05 22 12 34 55 31.3200 -97.3300 251.000 30.0 96.952 3.230 -999.990 -999.990 0.970 ..P WKT 2010 05 22 12 39 55 31.3200 -97.3300 251.000 122.0 97.941 2.720 -999.990 -999.990 0.979 ..P WKT 2010 05 22 12 44 55 31.3200 -97.3300 251.000 457.0 101.443 2.920 -999.990 -999.990 1.014 ..P WKT 2010 05 22 12 54 55 31.3200 -97.3300 251.000 30.0 97.678 3.050 -999.990 -999.990 0.977 ..P WKT 2010 05 22 12 59 55 31.3200 -97.3300 251.000 122.0 100.187 3.300 -999.990 -999.990 1.002 ..P WKT 2010 05 22 13 04 55 31.3200 -97.3300 251.000 457.0 96.273 3.970 -999.990 -999.990 0.963 ..P WKT 2010 05 22 13 09 55 31.3200 -97.3300 251.000 30.0 95.711 3.270 -999.990 -999.990 0.957 ..P WKT 2010 05 22 13 14 55 31.3200 -97.3300 251.000 122.0 97.660 3.340 -999.990 -999.990 0.977 ..P WKT 2010 05 22 13 19 55 31.3200 -97.3300 251.000 457.0 97.376 2.860 -999.990 -999.990 0.974 ..P WKT 2010 05 22 13 29 55 31.3200 -97.3300 251.000 30.0 95.055 3.840 -999.990 -999.990 0.951 ..P WKT 2010 05 22 13 34 55 31.3200 -97.3300 251.000 122.0 104.177 2.640 -999.990 -999.990 1.042 ..P WKT 2010 05 22 13 39 55 31.3200 -97.3300 251.000 457.0 98.234 3.280 -999.990 -999.990 0.982 ..P WKT 2010 05 22 13 44 55 31.3200 -97.3300 251.000 30.0 93.687 3.810 -999.990 -999.990 0.937 ..P WKT 2010 05 22 13 49 55 31.3200 -97.3300 251.000 122.0 101.691 3.710 -999.990 -999.990 1.017 ..P WKT 2010 05 22 13 54 55 31.3200 -97.3300 251.000 457.0 94.634 2.540 -999.990 -999.990 0.946 ..P WKT 2010 05 22 14 04 55 31.3200 -97.3300 251.000 30.0 96.518 3.330 -999.990 -999.990 0.965 ..P WKT 2010 05 22 14 09 55 31.3200 -97.3300 251.000 122.0 100.714 3.770 -999.990 -999.990 1.007 ..P WKT 2010 05 22 14 14 55 31.3200 -97.3300 251.000 457.0 98.081 3.490 -999.990 -999.990 0.981 ..P WKT 2010 05 22 14 19 55 31.3200 -97.3300 251.000 30.0 89.318 2.890 -999.990 -999.990 0.893 ..P WKT 2010 05 22 14 24 55 31.3200 -97.3300 251.000 122.0 97.555 3.390 -999.990 -999.990 0.976 ..P WKT 2010 05 22 14 29 55 31.3200 -97.3300 251.000 457.0 95.480 2.900 -999.990 -999.990 0.955 ..P WKT 2010 05 22 14 39 55 31.3200 -97.3300 251.000 30.0 98.655 2.830 -999.990 -999.990 0.987 ..P WKT 2010 05 22 14 44 55 31.3200 -97.3300 251.000 122.0 97.775 3.330 -999.990 -999.990 0.978 ..P WKT 2010 05 22 14 49 55 31.3200 -97.3300 251.000 457.0 100.655 3.520 -999.990 -999.990 1.007 ..P WKT 2010 05 22 14 54 55 31.3200 -97.3300 251.000 30.0 96.711 3.580 -999.990 -999.990 0.967 ..P WKT 2010 05 22 14 59 55 31.3200 -97.3300 251.000 122.0 101.261 4.240 -999.990 -999.990 1.013 ..P WKT 2010 05 22 15 04 55 31.3200 -97.3300 251.000 457.0 98.015 4.030 -999.990 -999.990 0.980 ..P WKT 2010 05 22 15 14 55 31.3200 -97.3300 251.000 30.0 104.467 4.000 -999.990 -999.990 1.045 ..P WKT 2010 05 22 15 19 55 31.3200 -97.3300 251.000 122.0 98.021 3.560 -999.990 -999.990 0.980 ..P WKT 2010 05 22 15 24 55 31.3200 -97.3300 251.000 457.0 100.759 2.770 -999.990 -999.990 1.008 ..P WKT 2010 05 22 15 29 55 31.3200 -97.3300 251.000 30.0 97.793 3.510 -999.990 -999.990 0.978 ..P WKT 2010 05 22 15 34 55 31.3200 -97.3300 251.000 122.0 98.861 3.380 -999.990 -999.990 0.989 ..P WKT 2010 05 22 15 39 55 31.3200 -97.3300 251.000 457.0 100.764 2.200 -999.990 -999.990 1.008 ..P WKT 2010 05 22 15 49 55 31.3200 -97.3300 251.000 30.0 97.038 2.570 -999.990 -999.990 0.970 ..P WKT 2010 05 22 15 54 55 31.3200 -97.3300 251.000 122.0 102.397 2.280 -999.990 -999.990 1.024 ..P WKT 2010 05 22 15 59 55 31.3200 -97.3300 251.000 457.0 95.798 3.450 -999.990 -999.990 0.958 ..P WKT 2010 05 22 16 04 55 31.3200 -97.3300 251.000 30.0 96.151 3.020 -999.990 -999.990 0.962 ..P WKT 2010 05 22 16 09 55 31.3200 -97.3300 251.000 122.0 100.118 2.680 -999.990 -999.990 1.001 ..P WKT 2010 05 22 16 14 55 31.3200 -97.3300 251.000 457.0 99.915 4.350 -999.990 -999.990 0.999 ..P WKT 2010 05 22 16 24 55 31.3200 -97.3300 251.000 30.0 99.151 3.380 -999.990 -999.990 0.992 ..P WKT 2010 05 22 16 29 55 31.3200 -97.3300 251.000 122.0 91.366 4.030 -999.990 -999.990 0.914 ..P WKT 2010 05 22 16 34 55 31.3200 -97.3300 251.000 457.0 102.197 2.620 -999.990 -999.990 1.022 ..P WKT 2010 05 22 16 39 55 31.3200 -97.3300 251.000 30.0 97.470 2.820 -999.990 -999.990 0.975 ..P WKT 2010 05 22 16 44 55 31.3200 -97.3300 251.000 122.0 99.687 2.560 -999.990 -999.990 0.997 ..P WKT 2010 05 22 16 49 55 31.3200 -97.3300 251.000 457.0 94.961 3.010 -999.990 -999.990 0.950 ..P WKT 2010 05 22 17 04 55 31.3200 -97.3300 251.000 30.0 98.211 1.930 -999.990 -999.990 0.982 ..P WKT 2010 05 22 17 09 55 31.3200 -97.3300 251.000 122.0 100.669 2.630 -999.990 -999.990 1.007 ..P WKT 2010 05 22 17 14 55 31.3200 -97.3300 251.000 457.0 95.356 2.050 -999.990 -999.990 0.954 ..P WKT 2010 05 22 17 19 55 31.3200 -97.3300 251.000 30.0 92.542 1.940 -999.990 -999.990 0.925 ..P WKT 2010 05 22 17 24 55 31.3200 -97.3300 251.000 122.0 99.995 1.550 -999.990 -999.990 1.000 ..P WKT 2010 05 22 17 29 55 31.3200 -97.3300 251.000 457.0 100.233 1.720 -999.990 -999.990 1.002 ..P WKT 2010 05 22 17 39 55 31.3200 -97.3300 251.000 30.0 102.685 2.470 -999.990 -999.990 1.027 ..P WKT 2010 05 22 17 44 55 31.3200 -97.3300 251.000 122.0 98.797 1.810 -999.990 -999.990 0.988 ..P WKT 2010 05 22 17 49 55 31.3200 -97.3300 251.000 457.0 98.654 2.820 -999.990 -999.990 0.987 ..P WKT 2010 05 22 17 54 55 31.3200 -97.3300 251.000 30.0 100.590 3.890 -999.990 -999.990 1.006 ..P WKT 2010 05 22 17 59 55 31.3200 -97.3300 251.000 122.0 95.872 2.950 -999.990 -999.990 0.959 ..P WKT 2010 05 22 18 04 55 31.3200 -97.3300 251.000 457.0 100.719 3.050 -999.990 -999.990 1.007 ..P WKT 2010 05 22 18 14 55 31.3200 -97.3300 251.000 30.0 99.006 3.520 -999.990 -999.990 0.990 ..P WKT 2010 05 22 18 19 55 31.3200 -97.3300 251.000 122.0 102.010 2.830 -999.990 -999.990 1.020 ..P WKT 2010 05 22 18 24 55 31.3200 -97.3300 251.000 457.0 99.333 3.110 -999.990 -999.990 0.993 ..P WKT 2010 05 22 18 29 55 31.3200 -97.3300 251.000 30.0 94.024 2.940 -999.990 -999.990 0.940 ..P WKT 2010 05 22 18 34 55 31.3200 -97.3300 251.000 122.0 105.340 5.140 -999.990 -999.990 1.053 ..P WKT 2010 05 22 18 39 55 31.3200 -97.3300 251.000 457.0 100.723 2.260 -999.990 -999.990 1.007 ..P WKT 2010 05 22 18 49 55 31.3200 -97.3300 251.000 30.0 102.375 2.590 -999.990 -999.990 1.024 ..P WKT 2010 05 22 18 54 55 31.3200 -97.3300 251.000 122.0 97.010 2.590 -999.990 -999.990 0.970 ..P WKT 2010 05 22 18 59 55 31.3200 -97.3300 251.000 457.0 98.429 3.180 -999.990 -999.990 0.984 ..P WKT 2010 05 22 19 04 55 31.3200 -97.3300 251.000 30.0 91.820 2.660 -999.990 -999.990 0.918 ..P WKT 2010 05 22 19 09 55 31.3200 -97.3300 251.000 122.0 102.651 2.640 -999.990 -999.990 1.027 ..P WKT 2010 05 22 19 14 55 31.3200 -97.3300 251.000 457.0 101.163 2.580 -999.990 -999.990 1.012 ..P WKT 2010 05 22 19 24 55 31.3200 -97.3300 251.000 30.0 93.523 3.850 -999.990 -999.990 0.935 ..P WKT 2010 05 22 19 29 55 31.3200 -97.3300 251.000 122.0 105.081 4.180 -999.990 -999.990 1.051 ..P WKT 2010 05 22 19 34 55 31.3200 -97.3300 251.000 457.0 102.249 3.830 -999.990 -999.990 1.022 ..P WKT 2010 05 22 19 39 55 31.3200 -97.3300 251.000 30.0 102.877 4.150 -999.990 -999.990 1.029 ..P WKT 2010 05 22 19 44 55 31.3200 -97.3300 251.000 122.0 104.057 3.810 -999.990 -999.990 1.041 ..P WKT 2010 05 22 19 49 55 31.3200 -97.3300 251.000 457.0 102.886 2.480 -999.990 -999.990 1.029 ..P WKT 2010 05 22 19 59 55 31.3200 -97.3300 251.000 30.0 103.962 2.980 -999.990 -999.990 1.040 ..P WKT 2010 05 22 20 04 55 31.3200 -97.3300 251.000 122.0 107.591 3.870 -999.990 -999.990 1.076 ..P WKT 2010 05 22 20 09 55 31.3200 -97.3300 251.000 457.0 113.153 4.490 -999.990 -999.990 1.132 ..P WKT 2010 05 22 20 14 55 31.3200 -97.3300 251.000 30.0 111.251 3.610 -999.990 -999.990 1.113 ..P WKT 2010 05 22 20 19 55 31.3200 -97.3300 251.000 122.0 115.983 2.320 -999.990 -999.990 1.160 ..P WKT 2010 05 22 20 24 55 31.3200 -97.3300 251.000 457.0 106.620 1.850 -999.990 -999.990 1.066 ..P WKT 2010 05 22 20 34 55 31.3200 -97.3300 251.000 30.0 101.240 2.130 -999.990 -999.990 1.012 ..P WKT 2010 05 22 20 39 55 31.3200 -97.3300 251.000 122.0 106.603 2.930 -999.990 -999.990 1.066 ..P WKT 2010 05 22 20 44 55 31.3200 -97.3300 251.000 457.0 96.496 2.280 -999.990 -999.990 0.965 ..P WKT 2010 05 22 20 49 55 31.3200 -97.3300 251.000 30.0 100.476 2.920 -999.990 -999.990 1.005 ..P WKT 2010 05 22 20 54 55 31.3200 -97.3300 251.000 122.0 103.627 4.270 -999.990 -999.990 1.036 ..P WKT 2010 05 22 20 59 55 31.3200 -97.3300 251.000 457.0 100.979 3.890 -999.990 -999.990 1.010 ..P WKT 2010 05 22 21 09 55 31.3200 -97.3300 251.000 30.0 95.310 2.520 -999.990 -999.990 0.953 ..P WKT 2010 05 22 21 14 55 31.3200 -97.3300 251.000 122.0 101.398 3.150 -999.990 -999.990 1.014 ..P WKT 2010 05 22 21 19 55 31.3200 -97.3300 251.000 457.0 95.341 2.440 -999.990 -999.990 0.953 ..P WKT 2010 05 22 21 24 55 31.3200 -97.3300 251.000 30.0 93.424 3.000 -999.990 -999.990 0.934 ..P WKT 2010 05 22 21 29 55 31.3200 -97.3300 251.000 122.0 105.029 2.030 -999.990 -999.990 1.050 ..P WKT 2010 05 22 21 34 55 31.3200 -97.3300 251.000 457.0 93.042 1.970 -999.990 -999.990 0.930 ..P WKT 2010 05 22 21 44 55 31.3200 -97.3300 251.000 30.0 104.520 2.470 -999.990 -999.990 1.045 ..P WKT 2010 05 22 21 49 55 31.3200 -97.3300 251.000 122.0 112.533 3.140 -999.990 -999.990 1.125 ..P WKT 2010 05 22 21 54 55 31.3200 -97.3300 251.000 457.0 109.375 2.280 -999.990 -999.990 1.094 ..P WKT 2010 05 22 21 59 55 31.3200 -97.3300 251.000 30.0 101.392 2.160 -999.990 -999.990 1.014 ..P WKT 2010 05 22 22 04 55 31.3200 -97.3300 251.000 122.0 112.159 3.110 -999.990 -999.990 1.122 ..P WKT 2010 05 22 22 09 55 31.3200 -97.3300 251.000 457.0 105.832 2.400 -999.990 -999.990 1.058 ..P WKT 2010 05 22 22 19 55 31.3200 -97.3300 251.000 30.0 110.684 2.620 -999.990 -999.990 1.107 ..P WKT 2010 05 22 22 24 55 31.3200 -97.3300 251.000 122.0 116.760 5.570 -999.990 -999.990 1.168 ..P WKT 2010 05 22 22 29 55 31.3200 -97.3300 251.000 457.0 103.960 2.620 -999.990 -999.990 1.040 ..P WKT 2010 05 22 22 34 55 31.3200 -97.3300 251.000 30.0 100.668 4.640 -999.990 -999.990 1.007 ..P WKT 2010 05 22 22 39 55 31.3200 -97.3300 251.000 122.0 101.785 3.110 -999.990 -999.990 1.018 ..P WKT 2010 05 22 22 44 55 31.3200 -97.3300 251.000 457.0 101.111 3.410 -999.990 -999.990 1.011 ..P WKT 2010 05 22 22 54 55 31.3200 -97.3300 251.000 30.0 98.879 3.770 -999.990 -999.990 0.989 ..P WKT 2010 05 22 22 59 55 31.3200 -97.3300 251.000 122.0 105.030 3.550 -999.990 -999.990 1.050 ..P WKT 2010 05 22 23 04 55 31.3200 -97.3300 251.000 457.0 100.443 3.990 -999.990 -999.990 1.004 ..P WKT 2010 05 22 23 09 55 31.3200 -97.3300 251.000 30.0 102.187 3.660 -999.990 -999.990 1.022 ..P WKT 2010 05 22 23 14 55 31.3200 -97.3300 251.000 122.0 107.097 4.090 -999.990 -999.990 1.071 ..P WKT 2010 05 22 23 19 55 31.3200 -97.3300 251.000 457.0 100.860 3.410 -999.990 -999.990 1.009 ..P WKT 2010 05 22 23 29 55 31.3200 -97.3300 251.000 30.0 98.162 3.220 -999.990 -999.990 0.982 ..P WKT 2010 05 22 23 34 55 31.3200 -97.3300 251.000 122.0 103.763 3.070 -999.990 -999.990 1.038 ..P WKT 2010 05 22 23 39 55 31.3200 -97.3300 251.000 457.0 94.233 2.670 -999.990 -999.990 0.942 ..P WKT 2010 05 22 23 44 55 31.3200 -97.3300 251.000 30.0 100.521 2.940 -999.990 -999.990 1.005 ..P WKT 2010 05 22 23 49 55 31.3200 -97.3300 251.000 122.0 109.558 2.160 -999.990 -999.990 1.096 ..P WKT 2010 05 23 00 09 55 31.3200 -97.3300 251.000 457.0 95.729 4.270 -999.990 -999.990 0.957 ..P WKT 2010 05 23 00 10 25 31.3200 -97.3300 251.000 457.0 99.036 3.530 -999.990 -999.990 0.990 ..P WKT 2010 05 23 00 10 55 31.3200 -97.3300 251.000 457.0 101.519 3.060 -999.990 -999.990 1.015 ..P WKT 2010 05 23 00 11 25 31.3200 -97.3300 251.000 457.0 99.054 2.100 -999.990 -999.990 0.991 ..P WKT 2010 05 23 00 11 55 31.3200 -97.3300 251.000 457.0 103.737 2.410 -999.990 -999.990 1.037 ..P WKT 2010 05 23 00 12 25 31.3200 -97.3300 251.000 457.0 103.745 1.500 -999.990 -999.990 1.037 ..P WKT 2010 05 23 00 12 55 31.3200 -97.3300 251.000 457.0 99.631 1.500 -999.990 -999.990 0.996 ..P WKT 2010 05 23 00 13 25 31.3200 -97.3300 251.000 457.0 102.938 1.810 -999.990 -999.990 1.029 ..P WKT 2010 05 23 00 13 55 31.3200 -97.3300 251.000 457.0 104.047 4.300 -999.990 -999.990 1.040 ..P WKT 2010 05 23 00 14 25 31.3200 -97.3300 251.000 457.0 98.283 2.500 -999.990 -999.990 0.983 ..P WKT 2010 05 23 00 14 55 31.3200 -97.3300 251.000 457.0 101.041 1.510 -999.990 -999.990 1.010 ..P WKT 2010 05 23 00 19 55 31.3200 -97.3300 251.000 30.0 110.199 2.240 -999.990 -999.990 1.102 ..P WKT 2010 05 23 00 24 55 31.3200 -97.3300 251.000 122.0 108.912 2.120 -999.990 -999.990 1.089 ..P WKT 2010 05 23 00 29 55 31.3200 -97.3300 251.000 457.0 112.297 3.600 -999.990 -999.990 1.123 ..P WKT 2010 05 23 00 34 55 31.3200 -97.3300 251.000 30.0 107.714 3.860 -999.990 -999.990 1.077 ..P WKT 2010 05 23 00 39 55 31.3200 -97.3300 251.000 122.0 105.605 1.860 -999.990 -999.990 1.056 ..P WKT 2010 05 23 00 44 55 31.3200 -97.3300 251.000 457.0 112.009 1.750 -999.990 -999.990 1.120 ..P WKT 2010 05 23 00 54 55 31.3200 -97.3300 251.000 30.0 100.414 4.310 -999.990 -999.990 1.004 ..P WKT 2010 05 23 00 59 55 31.3200 -97.3300 251.000 122.0 103.283 3.170 -999.990 -999.990 1.033 ..P WKT 2010 05 23 01 04 55 31.3200 -97.3300 251.000 457.0 103.955 2.940 -999.990 -999.990 1.040 ..P WKT 2010 05 23 01 09 55 31.3200 -97.3300 251.000 30.0 91.183 2.400 -999.990 -999.990 0.912 ..P WKT 2010 05 23 01 14 55 31.3200 -97.3300 251.000 122.0 99.538 1.930 -999.990 -999.990 0.995 ..P WKT 2010 05 23 01 19 55 31.3200 -97.3300 251.000 457.0 97.467 2.090 -999.990 -999.990 0.975 ..P WKT 2010 05 23 01 29 55 31.3200 -97.3300 251.000 30.0 97.989 2.430 -999.990 -999.990 0.980 ..P WKT 2010 05 23 01 34 55 31.3200 -97.3300 251.000 122.0 104.693 3.400 -999.990 -999.990 1.047 ..P WKT 2010 05 23 01 39 55 31.3200 -97.3300 251.000 457.0 101.116 3.380 -999.990 -999.990 1.011 ..P WKT 2010 05 23 01 44 55 31.3200 -97.3300 251.000 30.0 96.306 3.410 -999.990 -999.990 0.963 ..P WKT 2010 05 23 01 49 55 31.3200 -97.3300 251.000 122.0 104.926 3.050 -999.990 -999.990 1.049 ..P WKT 2010 05 23 01 54 55 31.3200 -97.3300 251.000 457.0 97.514 2.160 -999.990 -999.990 0.975 ..P WKT 2010 05 23 02 04 55 31.3200 -97.3300 251.000 30.0 99.875 2.800 -999.990 -999.990 0.999 ..P WKT 2010 05 23 02 09 55 31.3200 -97.3300 251.000 122.0 104.849 4.240 -999.990 -999.990 1.048 ..P WKT 2010 05 23 02 14 55 31.3200 -97.3300 251.000 457.0 97.227 3.880 -999.990 -999.990 0.972 ..P WKT 2010 05 23 02 19 55 31.3200 -97.3300 251.000 30.0 102.886 3.130 -999.990 -999.990 1.029 ..P WKT 2010 05 23 02 24 55 31.3200 -97.3300 251.000 122.0 108.406 2.080 -999.990 -999.990 1.084 ..P WKT 2010 05 23 02 29 55 31.3200 -97.3300 251.000 457.0 98.323 4.040 -999.990 -999.990 0.983 ..P WKT 2010 05 23 02 39 55 31.3200 -97.3300 251.000 30.0 94.095 2.470 -999.990 -999.990 0.941 ..P WKT 2010 05 23 02 44 55 31.3200 -97.3300 251.000 122.0 100.081 2.140 -999.990 -999.990 1.001 ..P WKT 2010 05 23 02 49 55 31.3200 -97.3300 251.000 457.0 89.244 3.100 -999.990 -999.990 0.892 ..P WKT 2010 05 23 02 54 55 31.3200 -97.3300 251.000 30.0 101.110 2.230 -999.990 -999.990 1.011 ..P WKT 2010 05 23 02 59 55 31.3200 -97.3300 251.000 122.0 109.416 4.550 -999.990 -999.990 1.094 ..P WKT 2010 05 23 03 04 55 31.3200 -97.3300 251.000 457.0 95.302 3.190 -999.990 -999.990 0.953 ..P WKT 2010 05 23 03 14 55 31.3200 -97.3300 251.000 30.0 109.646 2.640 -999.990 -999.990 1.096 ..P WKT 2010 05 23 03 19 55 31.3200 -97.3300 251.000 122.0 109.534 3.210 -999.990 -999.990 1.095 ..P WKT 2010 05 23 03 24 55 31.3200 -97.3300 251.000 457.0 96.580 2.980 -999.990 -999.990 0.966 ..P WKT 2010 05 23 03 29 55 31.3200 -97.3300 251.000 30.0 109.719 3.080 -999.990 -999.990 1.097 ..P WKT 2010 05 23 03 34 55 31.3200 -97.3300 251.000 122.0 114.933 2.910 -999.990 -999.990 1.149 ..P WKT 2010 05 23 03 39 55 31.3200 -97.3300 251.000 457.0 93.928 2.190 -999.990 -999.990 0.939 ..P WKT 2010 05 23 03 49 55 31.3200 -97.3300 251.000 30.0 109.446 3.180 -999.990 -999.990 1.094 ..P WKT 2010 05 23 03 54 55 31.3200 -97.3300 251.000 122.0 102.821 3.050 -999.990 -999.990 1.028 ..P WKT 2010 05 23 03 59 55 31.3200 -97.3300 251.000 457.0 94.834 2.660 -999.990 -999.990 0.948 ..P WKT 2010 05 23 04 04 55 31.3200 -97.3300 251.000 30.0 101.585 3.410 -999.990 -999.990 1.016 ..P WKT 2010 05 23 04 09 55 31.3200 -97.3300 251.000 122.0 97.421 2.650 -999.990 -999.990 0.974 ..P WKT 2010 05 23 04 14 55 31.3200 -97.3300 251.000 457.0 100.077 2.080 -999.990 -999.990 1.001 ..P WKT 2010 05 23 04 24 55 31.3200 -97.3300 251.000 30.0 98.688 2.820 -999.990 -999.990 0.987 ..P WKT 2010 05 23 04 29 55 31.3200 -97.3300 251.000 122.0 100.914 2.930 -999.990 -999.990 1.009 ..P WKT 2010 05 23 04 34 55 31.3200 -97.3300 251.000 457.0 94.689 3.050 -999.990 -999.990 0.947 ..P WKT 2010 05 23 04 39 55 31.3200 -97.3300 251.000 30.0 95.825 2.670 -999.990 -999.990 0.958 ..P WKT 2010 05 23 04 44 55 31.3200 -97.3300 251.000 122.0 99.960 2.230 -999.990 -999.990 1.000 ..P WKT 2010 05 23 04 49 55 31.3200 -97.3300 251.000 457.0 92.920 4.270 -999.990 -999.990 0.929 ..P WKT 2010 05 23 05 04 55 31.3200 -97.3300 251.000 30.0 98.963 4.480 -999.990 -999.990 0.990 ..P WKT 2010 05 23 05 09 55 31.3200 -97.3300 251.000 122.0 94.199 3.590 -999.990 -999.990 0.942 ..P WKT 2010 05 23 05 14 55 31.3200 -97.3300 251.000 457.0 91.070 4.420 -999.990 -999.990 0.911 ..P WKT 2010 05 23 05 19 55 31.3200 -97.3300 251.000 30.0 89.848 4.340 -999.990 -999.990 0.898 ..P WKT 2010 05 23 05 24 55 31.3200 -97.3300 251.000 122.0 92.164 3.690 -999.990 -999.990 0.922 ..P WKT 2010 05 23 05 29 55 31.3200 -97.3300 251.000 457.0 80.736 2.890 -999.990 -999.990 0.807 ..P WKT 2010 05 23 05 39 55 31.3200 -97.3300 251.000 30.0 93.790 3.440 -999.990 -999.990 0.938 ..P WKT 2010 05 23 05 44 55 31.3200 -97.3300 251.000 122.0 93.233 3.970 -999.990 -999.990 0.932 ..P WKT 2010 05 23 05 49 55 31.3200 -97.3300 251.000 457.0 90.909 5.020 -999.990 -999.990 0.909 ..P WKT 2010 05 23 05 54 55 31.3200 -97.3300 251.000 30.0 95.929 4.660 -999.990 -999.990 0.959 ..P WKT 2010 05 23 05 59 55 31.3200 -97.3300 251.000 122.0 96.868 3.270 -999.990 -999.990 0.969 ..P WKT 2010 05 23 06 04 55 31.3200 -97.3300 251.000 457.0 94.544 2.900 -999.990 -999.990 0.945 ..P WKT 2010 05 23 06 14 55 31.3200 -97.3300 251.000 30.0 95.277 2.690 -999.990 -999.990 0.953 ..P WKT 2010 05 23 06 19 55 31.3200 -97.3300 251.000 122.0 94.256 2.970 -999.990 -999.990 0.943 ..P WKT 2010 05 23 06 24 55 31.3200 -97.3300 251.000 457.0 96.359 4.000 -999.990 -999.990 0.964 ..P WKT 2010 05 23 06 29 55 31.3200 -97.3300 251.000 30.0 87.460 3.500 -999.990 -999.990 0.875 ..P WKT 2010 05 23 06 34 55 31.3200 -97.3300 251.000 122.0 92.279 2.510 -999.990 -999.990 0.923 ..P WKT 2010 05 23 06 39 55 31.3200 -97.3300 251.000 457.0 96.826 2.300 -999.990 -999.990 0.968 ..P WKT 2010 05 23 06 49 55 31.3200 -97.3300 251.000 30.0 92.438 2.560 -999.990 -999.990 0.924 ..P WKT 2010 05 23 06 54 55 31.3200 -97.3300 251.000 122.0 92.736 2.600 -999.990 -999.990 0.927 ..P WKT 2010 05 23 06 59 55 31.3200 -97.3300 251.000 457.0 86.656 2.550 -999.990 -999.990 0.867 ..P WKT 2010 05 23 07 04 55 31.3200 -97.3300 251.000 30.0 89.533 3.400 -999.990 -999.990 0.895 ..P WKT 2010 05 23 07 09 55 31.3200 -97.3300 251.000 122.0 90.917 2.870 -999.990 -999.990 0.909 ..P WKT 2010 05 23 07 14 55 31.3200 -97.3300 251.000 457.0 86.197 2.770 -999.990 -999.990 0.862 ..P WKT 2010 05 23 07 24 55 31.3200 -97.3300 251.000 30.0 87.066 2.780 -999.990 -999.990 0.871 ..P WKT 2010 05 23 07 29 55 31.3200 -97.3300 251.000 122.0 93.329 2.740 -999.990 -999.990 0.933 ..P WKT 2010 05 23 07 34 55 31.3200 -97.3300 251.000 457.0 87.393 3.120 -999.990 -999.990 0.874 ..P WKT 2010 05 23 07 39 55 31.3200 -97.3300 251.000 30.0 89.995 3.460 -999.990 -999.990 0.900 ..P WKT 2010 05 23 07 44 55 31.3200 -97.3300 251.000 122.0 88.803 3.000 -999.990 -999.990 0.888 ..P WKT 2010 05 23 07 49 55 31.3200 -97.3300 251.000 457.0 85.985 2.550 -999.990 -999.990 0.860 ..P WKT 2010 05 23 07 59 55 31.3200 -97.3300 251.000 30.0 83.796 4.540 -999.990 -999.990 0.838 ..P WKT 2010 05 23 08 04 55 31.3200 -97.3300 251.000 122.0 89.299 2.470 -999.990 -999.990 0.893 ..P WKT 2010 05 23 08 09 55 31.3200 -97.3300 251.000 457.0 90.468 3.270 -999.990 -999.990 0.905 ..P WKT 2010 05 23 08 14 55 31.3200 -97.3300 251.000 30.0 84.055 3.040 -999.990 -999.990 0.841 ..P WKT 2010 05 23 08 19 55 31.3200 -97.3300 251.000 122.0 90.096 2.260 -999.990 -999.990 0.901 ..P WKT 2010 05 23 08 24 55 31.3200 -97.3300 251.000 457.0 87.204 2.470 -999.990 -999.990 0.872 ..P WKT 2010 05 23 08 34 55 31.3200 -97.3300 251.000 30.0 90.700 3.380 -999.990 -999.990 0.907 ..P WKT 2010 05 23 08 39 55 31.3200 -97.3300 251.000 122.0 84.910 4.250 -999.990 -999.990 0.849 ..P WKT 2010 05 23 08 44 55 31.3200 -97.3300 251.000 457.0 86.426 4.680 -999.990 -999.990 0.864 ..P WKT 2010 05 23 08 49 55 31.3200 -97.3300 251.000 30.0 85.237 3.550 -999.990 -999.990 0.852 ..P WKT 2010 05 23 08 54 55 31.3200 -97.3300 251.000 122.0 92.701 3.860 -999.990 -999.990 0.927 ..P WKT 2010 05 23 08 59 55 31.3200 -97.3300 251.000 457.0 86.104 3.900 -999.990 -999.990 0.861 ..P WKT 2010 05 23 09 09 55 31.3200 -97.3300 251.000 30.0 87.241 5.590 -999.990 -999.990 0.872 ..P WKT 2010 05 23 09 14 55 31.3200 -97.3300 251.000 122.0 89.025 3.760 -999.990 -999.990 0.890 ..P WKT 2010 05 23 09 19 55 31.3200 -97.3300 251.000 457.0 86.756 3.810 -999.990 -999.990 0.868 ..P WKT 2010 05 23 09 24 55 31.3200 -97.3300 251.000 30.0 90.970 3.900 -999.990 -999.990 0.910 ..P WKT 2010 05 23 09 29 55 31.3200 -97.3300 251.000 122.0 86.946 4.270 -999.990 -999.990 0.869 ..P WKT 2010 05 23 09 34 55 31.3200 -97.3300 251.000 457.0 81.302 3.470 -999.990 -999.990 0.813 ..P WKT 2010 05 23 09 44 55 31.3200 -97.3300 251.000 30.0 81.359 3.200 -999.990 -999.990 0.814 ..P WKT 2010 05 23 09 49 55 31.3200 -97.3300 251.000 122.0 83.682 3.390 -999.990 -999.990 0.837 ..P WKT 2010 05 23 09 54 55 31.3200 -97.3300 251.000 457.0 82.766 4.160 -999.990 -999.990 0.828 ..P WKT 2010 05 23 09 59 55 31.3200 -97.3300 251.000 30.0 79.556 3.760 -999.990 -999.990 0.796 ..P WKT 2010 05 23 10 04 55 31.3200 -97.3300 251.000 122.0 91.861 3.090 -999.990 -999.990 0.919 ..P WKT 2010 05 23 10 09 55 31.3200 -97.3300 251.000 457.0 86.357 3.080 -999.990 -999.990 0.864 ..P WKT 2010 05 23 10 19 55 31.3200 -97.3300 251.000 30.0 85.526 2.880 -999.990 -999.990 0.855 ..P WKT 2010 05 23 10 24 55 31.3200 -97.3300 251.000 122.0 87.500 2.900 -999.990 -999.990 0.875 ..P WKT 2010 05 23 10 29 55 31.3200 -97.3300 251.000 457.0 94.595 3.530 -999.990 -999.990 0.946 ..P WKT 2010 05 23 10 34 55 31.3200 -97.3300 251.000 30.0 88.614 2.820 -999.990 -999.990 0.886 ..P WKT 2010 05 23 10 39 55 31.3200 -97.3300 251.000 122.0 89.777 3.400 -999.990 -999.990 0.898 ..P WKT 2010 05 23 10 44 55 31.3200 -97.3300 251.000 457.0 88.110 3.280 -999.990 -999.990 0.881 ..P WKT 2010 05 23 10 54 55 31.3200 -97.3300 251.000 30.0 85.375 3.230 -999.990 -999.990 0.854 ..P WKT 2010 05 23 10 59 55 31.3200 -97.3300 251.000 122.0 89.020 2.930 -999.990 -999.990 0.890 ..P WKT 2010 05 23 11 04 55 31.3200 -97.3300 251.000 457.0 84.450 3.710 -999.990 -999.990 0.845 ..P WKT 2010 05 23 11 09 55 31.3200 -97.3300 251.000 30.0 83.382 4.920 -999.990 -999.990 0.834 ..P WKT 2010 05 23 11 14 55 31.3200 -97.3300 251.000 122.0 88.909 4.080 -999.990 -999.990 0.889 ..P WKT 2010 05 23 11 19 55 31.3200 -97.3300 251.000 457.0 90.129 4.270 -999.990 -999.990 0.901 ..P WKT 2010 05 23 11 29 55 31.3200 -97.3300 251.000 30.0 82.236 3.330 -999.990 -999.990 0.822 ..P WKT 2010 05 23 11 34 55 31.3200 -97.3300 251.000 122.0 92.497 4.400 -999.990 -999.990 0.925 ..P WKT 2010 05 23 11 39 55 31.3200 -97.3300 251.000 457.0 91.727 4.370 -999.990 -999.990 0.917 ..P WKT 2010 05 23 11 44 55 31.3200 -97.3300 251.000 30.0 87.728 5.660 -999.990 -999.990 0.877 ..P WKT 2010 05 23 11 49 55 31.3200 -97.3300 251.000 122.0 96.102 5.230 -999.990 -999.990 0.961 ..P WKT 2010 05 23 12 09 55 31.3200 -97.3300 251.000 457.0 98.194 3.310 -999.990 -999.990 0.982 ..P WKT 2010 05 23 12 10 25 31.3200 -97.3300 251.000 457.0 95.424 3.110 -999.990 -999.990 0.954 ..P WKT 2010 05 23 12 10 55 31.3200 -97.3300 251.000 457.0 97.764 3.210 -999.990 -999.990 0.978 ..P WKT 2010 05 23 12 11 25 31.3200 -97.3300 251.000 457.0 92.842 3.280 -999.990 -999.990 0.928 ..P WKT 2010 05 23 12 11 55 31.3200 -97.3300 251.000 457.0 92.224 3.910 -999.990 -999.990 0.922 ..P WKT 2010 05 23 12 12 25 31.3200 -97.3300 251.000 457.0 94.833 3.510 -999.990 -999.990 0.948 ..P WKT 2010 05 23 12 12 55 31.3200 -97.3300 251.000 457.0 95.559 4.650 -999.990 -999.990 0.956 ..P WKT 2010 05 23 12 13 25 31.3200 -97.3300 251.000 457.0 94.403 5.210 -999.990 -999.990 0.944 ..P WKT 2010 05 23 12 13 55 31.3200 -97.3300 251.000 457.0 91.363 4.780 -999.990 -999.990 0.914 ..P WKT 2010 05 23 12 14 25 31.3200 -97.3300 251.000 457.0 98.813 3.880 -999.990 -999.990 0.988 ..P WKT 2010 05 23 12 14 55 31.3200 -97.3300 251.000 457.0 105.188 5.000 -999.990 -999.990 1.052 ..P WKT 2010 05 23 12 19 55 31.3200 -97.3300 251.000 30.0 89.856 4.860 -999.990 -999.990 0.899 ..P WKT 2010 05 23 12 24 55 31.3200 -97.3300 251.000 122.0 102.502 5.080 -999.990 -999.990 1.025 ..P WKT 2010 05 23 12 29 55 31.3200 -97.3300 251.000 457.0 100.620 4.340 -999.990 -999.990 1.006 ..P WKT 2010 05 23 12 34 55 31.3200 -97.3300 251.000 30.0 92.547 3.430 -999.990 -999.990 0.925 ..P WKT 2010 05 23 12 39 55 31.3200 -97.3300 251.000 122.0 94.970 4.280 -999.990 -999.990 0.950 ..P WKT 2010 05 23 12 44 55 31.3200 -97.3300 251.000 457.0 87.969 3.010 -999.990 -999.990 0.880 ..P WKT 2010 05 23 12 54 55 31.3200 -97.3300 251.000 30.0 88.170 2.950 -999.990 -999.990 0.882 ..P WKT 2010 05 23 12 59 55 31.3200 -97.3300 251.000 122.0 92.413 3.200 -999.990 -999.990 0.924 ..P WKT 2010 05 23 13 04 55 31.3200 -97.3300 251.000 457.0 93.156 3.300 -999.990 -999.990 0.932 ..P WKT 2010 05 23 13 09 55 31.3200 -97.3300 251.000 30.0 88.507 4.010 -999.990 -999.990 0.885 ..P WKT 2010 05 23 13 14 55 31.3200 -97.3300 251.000 122.0 91.676 3.010 -999.990 -999.990 0.917 ..P WKT 2010 05 23 13 19 55 31.3200 -97.3300 251.000 457.0 89.182 3.150 -999.990 -999.990 0.892 ..P WKT 2010 05 23 13 29 55 31.3200 -97.3300 251.000 30.0 86.351 3.260 -999.990 -999.990 0.864 ..P WKT 2010 05 23 13 34 55 31.3200 -97.3300 251.000 122.0 90.330 3.810 -999.990 -999.990 0.903 ..P WKT 2010 05 23 13 39 55 31.3200 -97.3300 251.000 457.0 88.375 3.350 -999.990 -999.990 0.884 ..P WKT 2010 05 23 13 44 55 31.3200 -97.3300 251.000 30.0 92.895 3.340 -999.990 -999.990 0.929 ..P WKT 2010 05 23 13 49 55 31.3200 -97.3300 251.000 122.0 94.853 2.980 -999.990 -999.990 0.949 ..P WKT 2010 05 23 13 54 55 31.3200 -97.3300 251.000 457.0 93.302 3.920 -999.990 -999.990 0.933 ..P WKT 2010 05 23 14 04 55 31.3200 -97.3300 251.000 30.0 89.370 3.550 -999.990 -999.990 0.894 ..P WKT 2010 05 23 14 09 55 31.3200 -97.3300 251.000 122.0 95.090 3.440 -999.990 -999.990 0.951 ..P WKT 2010 05 23 14 14 55 31.3200 -97.3300 251.000 457.0 91.358 5.370 -999.990 -999.990 0.914 ..P WKT 2010 05 23 14 19 55 31.3200 -97.3300 251.000 30.0 81.815 3.140 -999.990 -999.990 0.818 ..P WKT 2010 05 23 14 24 55 31.3200 -97.3300 251.000 122.0 96.456 3.450 -999.990 -999.990 0.965 ..P WKT 2010 05 23 14 29 55 31.3200 -97.3300 251.000 457.0 83.937 4.090 -999.990 -999.990 0.839 ..P WKT 2010 05 23 14 39 55 31.3200 -97.3300 251.000 30.0 84.747 2.690 -999.990 -999.990 0.847 ..P WKT 2010 05 23 14 44 55 31.3200 -97.3300 251.000 122.0 92.001 4.220 -999.990 -999.990 0.920 ..P WKT 2010 05 23 14 49 55 31.3200 -97.3300 251.000 457.0 81.945 3.010 -999.990 -999.990 0.819 ..P WKT 2010 05 23 14 54 55 31.3200 -97.3300 251.000 30.0 89.742 3.060 -999.990 -999.990 0.897 ..P WKT 2010 05 23 14 59 55 31.3200 -97.3300 251.000 122.0 90.370 3.350 -999.990 -999.990 0.904 ..P WKT 2010 05 23 15 04 55 31.3200 -97.3300 251.000 457.0 83.962 3.920 -999.990 -999.990 0.840 ..P WKT 2010 05 23 15 14 55 31.3200 -97.3300 251.000 30.0 86.843 3.810 -999.990 -999.990 0.868 ..P WKT 2010 05 23 15 19 55 31.3200 -97.3300 251.000 122.0 94.242 5.080 -999.990 -999.990 0.942 ..P WKT 2010 05 23 15 24 55 31.3200 -97.3300 251.000 457.0 89.725 3.680 -999.990 -999.990 0.897 ..P WKT 2010 05 23 15 29 55 31.3200 -97.3300 251.000 30.0 85.072 3.480 -999.990 -999.990 0.851 ..P WKT 2010 05 23 15 34 55 31.3200 -97.3300 251.000 122.0 96.946 3.490 -999.990 -999.990 0.969 ..P WKT 2010 05 23 15 39 55 31.3200 -97.3300 251.000 457.0 91.208 3.310 -999.990 -999.990 0.912 ..P WKT 2010 05 23 15 49 55 31.3200 -97.3300 251.000 30.0 97.697 5.360 -999.990 -999.990 0.977 ..P WKT 2010 05 23 15 54 55 31.3200 -97.3300 251.000 122.0 99.897 3.380 -999.990 -999.990 0.999 ..P WKT 2010 05 23 15 59 55 31.3200 -97.3300 251.000 457.0 92.877 3.310 -999.990 -999.990 0.929 ..P WKT 2010 05 23 16 04 55 31.3200 -97.3300 251.000 30.0 88.568 3.260 -999.990 -999.990 0.886 ..P WKT 2010 05 23 16 09 55 31.3200 -97.3300 251.000 122.0 93.480 3.360 -999.990 -999.990 0.935 ..P WKT 2010 05 23 16 14 55 31.3200 -97.3300 251.000 457.0 91.882 3.490 -999.990 -999.990 0.919 ..P WKT 2010 05 23 16 24 55 31.3200 -97.3300 251.000 30.0 94.385 3.160 -999.990 -999.990 0.944 ..P WKT 2010 05 23 16 29 55 31.3200 -97.3300 251.000 122.0 94.687 3.330 -999.990 -999.990 0.947 ..P WKT 2010 05 23 16 34 55 31.3200 -97.3300 251.000 457.0 93.360 2.530 -999.990 -999.990 0.934 ..P WKT 2010 05 23 16 39 55 31.3200 -97.3300 251.000 30.0 90.946 3.810 -999.990 -999.990 0.909 ..P WKT 2010 05 23 16 44 55 31.3200 -97.3300 251.000 122.0 99.126 2.240 -999.990 -999.990 0.991 ..P WKT 2010 05 23 16 49 55 31.3200 -97.3300 251.000 457.0 96.984 2.130 -999.990 -999.990 0.970 ..P WKT 2010 05 23 17 04 55 31.3200 -97.3300 251.000 30.0 88.684 2.310 -999.990 -999.990 0.887 ..P WKT 2010 05 23 17 09 55 31.3200 -97.3300 251.000 122.0 95.256 3.250 -999.990 -999.990 0.953 ..P WKT 2010 05 23 17 14 55 31.3200 -97.3300 251.000 457.0 83.337 5.150 -999.990 -999.990 0.833 ..P WKT 2010 05 23 17 19 55 31.3200 -97.3300 251.000 30.0 88.007 4.770 -999.990 -999.990 0.880 ..P WKT 2010 05 23 17 24 55 31.3200 -97.3300 251.000 122.0 93.222 4.280 -999.990 -999.990 0.932 ..P WKT 2010 05 23 17 29 55 31.3200 -97.3300 251.000 457.0 88.371 3.910 -999.990 -999.990 0.884 ..P WKT 2010 05 23 17 39 55 31.3200 -97.3300 251.000 30.0 91.228 3.820 -999.990 -999.990 0.912 ..P WKT 2010 05 23 17 44 55 31.3200 -97.3300 251.000 122.0 97.850 4.860 -999.990 -999.990 0.978 ..P WKT 2010 05 23 17 49 55 31.3200 -97.3300 251.000 457.0 93.583 4.950 -999.990 -999.990 0.936 ..P WKT 2010 05 23 17 54 55 31.3200 -97.3300 251.000 30.0 94.625 4.100 -999.990 -999.990 0.946 ..P WKT 2010 05 23 17 59 55 31.3200 -97.3300 251.000 122.0 92.944 3.090 -999.990 -999.990 0.929 ..P WKT 2010 05 23 18 04 55 31.3200 -97.3300 251.000 457.0 92.760 3.850 -999.990 -999.990 0.928 ..P WKT 2010 05 23 18 14 55 31.3200 -97.3300 251.000 30.0 89.550 2.370 -999.990 -999.990 0.895 ..P WKT 2010 05 23 18 19 55 31.3200 -97.3300 251.000 122.0 95.791 3.370 -999.990 -999.990 0.958 ..P WKT 2010 05 23 18 24 55 31.3200 -97.3300 251.000 457.0 91.674 3.640 -999.990 -999.990 0.917 ..P WKT 2010 05 23 18 29 55 31.3200 -97.3300 251.000 30.0 92.191 2.810 -999.990 -999.990 0.922 ..P WKT 2010 05 23 18 34 55 31.3200 -97.3300 251.000 122.0 92.300 2.930 -999.990 -999.990 0.923 ..P WKT 2010 05 23 18 39 55 31.3200 -97.3300 251.000 457.0 90.771 3.790 -999.990 -999.990 0.908 ..P WKT 2010 05 23 18 49 55 31.3200 -97.3300 251.000 30.0 90.324 1.940 -999.990 -999.990 0.903 ..P WKT 2010 05 23 18 54 55 31.3200 -97.3300 251.000 122.0 91.953 2.190 -999.990 -999.990 0.920 ..P WKT 2010 05 23 18 59 55 31.3200 -97.3300 251.000 457.0 89.623 3.290 -999.990 -999.990 0.896 ..P WKT 2010 05 23 19 04 55 31.3200 -97.3300 251.000 30.0 99.855 4.050 -999.990 -999.990 0.999 ..P WKT 2010 05 23 19 09 55 31.3200 -97.3300 251.000 122.0 109.407 3.510 -999.990 -999.990 1.094 ..P WKT 2010 05 23 19 14 55 31.3200 -97.3300 251.000 457.0 99.567 3.840 -999.990 -999.990 0.996 ..P WKT 2010 05 23 19 24 55 31.3200 -97.3300 251.000 30.0 98.421 3.750 -999.990 -999.990 0.984 ..P WKT 2010 05 23 19 29 55 31.3200 -97.3300 251.000 122.0 104.113 3.340 -999.990 -999.990 1.041 ..P WKT 2010 05 23 19 34 55 31.3200 -97.3300 251.000 457.0 96.140 4.050 -999.990 -999.990 0.961 ..P WKT 2010 05 23 19 39 55 31.3200 -97.3300 251.000 30.0 91.171 3.030 -999.990 -999.990 0.912 ..P WKT 2010 05 23 19 44 55 31.3200 -97.3300 251.000 122.0 96.592 2.450 -999.990 -999.990 0.966 ..P WKT 2010 05 23 19 49 55 31.3200 -97.3300 251.000 457.0 100.648 2.180 -999.990 -999.990 1.006 ..P WKT 2010 05 23 19 59 55 31.3200 -97.3300 251.000 30.0 101.455 2.310 -999.990 -999.990 1.015 ..P WKT 2010 05 23 20 04 55 31.3200 -97.3300 251.000 122.0 105.592 2.320 -999.990 -999.990 1.056 ..P WKT 2010 05 23 20 09 55 31.3200 -97.3300 251.000 457.0 97.414 3.130 -999.990 -999.990 0.974 ..P WKT 2010 05 23 20 14 55 31.3200 -97.3300 251.000 30.0 103.742 4.240 -999.990 -999.990 1.037 ..P WKT 2010 05 23 20 19 55 31.3200 -97.3300 251.000 122.0 107.061 3.480 -999.990 -999.990 1.071 ..P WKT 2010 05 23 20 24 55 31.3200 -97.3300 251.000 457.0 102.164 2.520 -999.990 -999.990 1.022 ..P WKT 2010 05 23 20 34 55 31.3200 -97.3300 251.000 30.0 89.469 2.720 -999.990 -999.990 0.895 ..P WKT 2010 05 23 20 39 55 31.3200 -97.3300 251.000 122.0 97.563 3.430 -999.990 -999.990 0.976 ..P WKT 2010 05 23 20 44 55 31.3200 -97.3300 251.000 457.0 96.890 5.080 -999.990 -999.990 0.969 ..P WKT 2010 05 23 20 49 55 31.3200 -97.3300 251.000 30.0 92.652 3.480 -999.990 -999.990 0.927 ..P WKT 2010 05 23 20 54 55 31.3200 -97.3300 251.000 122.0 97.735 3.590 -999.990 -999.990 0.977 ..P WKT 2010 05 23 20 59 55 31.3200 -97.3300 251.000 457.0 89.932 2.870 -999.990 -999.990 0.899 ..P WKT 2010 05 23 21 09 55 31.3200 -97.3300 251.000 30.0 96.458 2.700 -999.990 -999.990 0.965 ..P WKT 2010 05 23 21 14 55 31.3200 -97.3300 251.000 122.0 98.175 2.000 -999.990 -999.990 0.982 ..P WKT 2010 05 23 21 19 55 31.3200 -97.3300 251.000 457.0 94.815 3.450 -999.990 -999.990 0.948 ..P WKT 2010 05 23 21 24 55 31.3200 -97.3300 251.000 30.0 91.592 4.230 -999.990 -999.990 0.916 ..P WKT 2010 05 23 21 29 55 31.3200 -97.3300 251.000 122.0 97.427 3.120 -999.990 -999.990 0.974 ..P WKT 2010 05 23 21 34 55 31.3200 -97.3300 251.000 457.0 100.243 2.710 -999.990 -999.990 1.002 ..P WKT 2010 05 23 21 44 55 31.3200 -97.3300 251.000 30.0 106.645 2.570 -999.990 -999.990 1.066 ..P WKT 2010 05 23 21 49 55 31.3200 -97.3300 251.000 122.0 101.164 3.710 -999.990 -999.990 1.012 ..P WKT 2010 05 23 21 54 55 31.3200 -97.3300 251.000 457.0 96.368 4.390 -999.990 -999.990 0.964 ..P WKT 2010 05 23 21 59 55 31.3200 -97.3300 251.000 30.0 93.356 3.020 -999.990 -999.990 0.934 ..P WKT 2010 05 23 22 04 55 31.3200 -97.3300 251.000 122.0 96.666 2.050 -999.990 -999.990 0.967 ..P WKT 2010 05 23 22 09 55 31.3200 -97.3300 251.000 457.0 100.664 2.820 -999.990 -999.990 1.007 ..P WKT 2010 05 23 22 19 55 31.3200 -97.3300 251.000 30.0 95.287 1.570 -999.990 -999.990 0.953 ..P WKT 2010 05 23 22 24 55 31.3200 -97.3300 251.000 122.0 101.861 1.780 -999.990 -999.990 1.019 ..P WKT 2010 05 23 22 29 55 31.3200 -97.3300 251.000 457.0 99.909 4.420 -999.990 -999.990 0.999 ..P WKT 2010 05 23 22 34 55 31.3200 -97.3300 251.000 30.0 100.432 3.010 -999.990 -999.990 1.004 ..P WKT 2010 05 23 22 39 55 31.3200 -97.3300 251.000 122.0 103.709 3.090 -999.990 -999.990 1.037 ..P WKT 2010 05 23 22 44 55 31.3200 -97.3300 251.000 457.0 97.350 2.090 -999.990 -999.990 0.973 ..P WKT 2010 05 23 22 54 55 31.3200 -97.3300 251.000 30.0 99.695 2.440 -999.990 -999.990 0.997 ..P WKT 2010 05 23 22 59 55 31.3200 -97.3300 251.000 122.0 108.954 3.030 -999.990 -999.990 1.090 ..P WKT 2010 05 23 23 04 55 31.3200 -97.3300 251.000 457.0 103.065 3.670 -999.990 -999.990 1.031 ..P WKT 2010 05 23 23 09 55 31.3200 -97.3300 251.000 30.0 97.449 7.500 -999.990 -999.990 0.974 ..P WKT 2010 05 23 23 14 55 31.3200 -97.3300 251.000 122.0 106.575 3.970 -999.990 -999.990 1.066 ..P WKT 2010 05 23 23 19 55 31.3200 -97.3300 251.000 457.0 105.644 2.900 -999.990 -999.990 1.056 ..P WKT 2010 05 23 23 29 55 31.3200 -97.3300 251.000 30.0 98.334 2.660 -999.990 -999.990 0.983 ..P WKT 2010 05 23 23 34 55 31.3200 -97.3300 251.000 122.0 100.503 3.930 -999.990 -999.990 1.005 ..P WKT 2010 05 23 23 39 55 31.3200 -97.3300 251.000 457.0 90.535 4.630 -999.990 -999.990 0.905 ..P WKT 2010 05 23 23 44 55 31.3200 -97.3300 251.000 30.0 94.635 5.260 -999.990 -999.990 0.946 ..P WKT 2010 05 23 23 49 55 31.3200 -97.3300 251.000 122.0 98.461 2.880 -999.990 -999.990 0.985 ..P WKT 2010 05 24 00 09 55 31.3200 -97.3300 251.000 457.0 100.893 1.690 -999.990 -999.990 1.009 ..P WKT 2010 05 24 00 10 25 31.3200 -97.3300 251.000 457.0 96.380 1.620 -999.990 -999.990 0.964 ..P WKT 2010 05 24 00 10 55 31.3200 -97.3300 251.000 457.0 98.495 2.160 -999.990 -999.990 0.985 ..P WKT 2010 05 24 00 11 25 31.3200 -97.3300 251.000 457.0 103.371 3.210 -999.990 -999.990 1.034 ..P WKT 2010 05 24 00 11 55 31.3200 -97.3300 251.000 457.0 101.343 1.850 -999.990 -999.990 1.013 ..P WKT 2010 05 24 00 12 25 31.3200 -97.3300 251.000 457.0 103.734 1.610 -999.990 -999.990 1.037 ..P WKT 2010 05 24 00 12 55 31.3200 -97.3300 251.000 457.0 103.088 2.680 -999.990 -999.990 1.031 ..P WKT 2010 05 24 00 13 25 31.3200 -97.3300 251.000 457.0 94.709 2.820 -999.990 -999.990 0.947 ..P WKT 2010 05 24 00 13 55 31.3200 -97.3300 251.000 457.0 90.748 2.340 -999.990 -999.990 0.907 ..P WKT 2010 05 24 00 14 25 31.3200 -97.3300 251.000 457.0 98.938 2.820 -999.990 -999.990 0.989 ..P WKT 2010 05 24 00 14 55 31.3200 -97.3300 251.000 457.0 95.806 2.100 -999.990 -999.990 0.958 ..P WKT 2010 05 24 00 19 55 31.3200 -97.3300 251.000 30.0 97.623 2.660 -999.990 -999.990 0.976 ..P WKT 2010 05 24 00 24 55 31.3200 -97.3300 251.000 122.0 104.687 1.980 -999.990 -999.990 1.047 ..P WKT 2010 05 24 00 29 55 31.3200 -97.3300 251.000 457.0 102.914 1.960 -999.990 -999.990 1.029 ..P WKT 2010 05 24 00 34 55 31.3200 -97.3300 251.000 30.0 96.997 2.150 -999.990 -999.990 0.970 ..P WKT 2010 05 24 00 39 55 31.3200 -97.3300 251.000 122.0 100.748 2.790 -999.990 -999.990 1.007 ..P WKT 2010 05 24 00 44 55 31.3200 -97.3300 251.000 457.0 89.857 2.310 -999.990 -999.990 0.899 ..P WKT 2010 05 24 00 54 55 31.3200 -97.3300 251.000 30.0 96.820 2.530 -999.990 -999.990 0.968 ..P WKT 2010 05 24 00 59 55 31.3200 -97.3300 251.000 122.0 100.309 2.310 -999.990 -999.990 1.003 ..P WKT 2010 05 24 01 04 55 31.3200 -97.3300 251.000 457.0 94.679 2.340 -999.990 -999.990 0.947 ..P WKT 2010 05 24 01 09 55 31.3200 -97.3300 251.000 30.0 90.982 2.940 -999.990 -999.990 0.910 ..P WKT 2010 05 24 01 14 55 31.3200 -97.3300 251.000 122.0 91.984 2.520 -999.990 -999.990 0.920 ..P WKT 2010 05 24 01 19 55 31.3200 -97.3300 251.000 457.0 87.319 3.730 -999.990 -999.990 0.873 ..P WKT 2010 05 24 01 29 55 31.3200 -97.3300 251.000 30.0 92.305 2.750 -999.990 -999.990 0.923 ..P WKT 2010 05 24 01 34 55 31.3200 -97.3300 251.000 122.0 96.151 3.190 -999.990 -999.990 0.962 ..P WKT 2010 05 24 01 39 55 31.3200 -97.3300 251.000 457.0 88.384 6.280 -999.990 -999.990 0.884 ..P WKT 2010 05 24 01 44 55 31.3200 -97.3300 251.000 30.0 93.475 8.650 -999.990 -999.990 0.935 ..P WKT 2010 05 24 01 49 55 31.3200 -97.3300 251.000 122.0 97.322 6.410 -999.990 -999.990 0.973 ..P WKT 2010 05 24 01 54 55 31.3200 -97.3300 251.000 457.0 95.500 4.230 -999.990 -999.990 0.955 ..P WKT 2010 05 24 02 04 55 31.3200 -97.3300 251.000 30.0 96.775 4.110 -999.990 -999.990 0.968 ..P WKT 2010 05 24 02 09 55 31.3200 -97.3300 251.000 122.0 99.458 6.450 -999.990 -999.990 0.995 ..P WKT 2010 05 24 02 14 55 31.3200 -97.3300 251.000 457.0 99.375 7.790 -999.990 -999.990 0.994 ..P WKT 2010 05 24 02 19 55 31.3200 -97.3300 251.000 30.0 101.920 6.030 -999.990 -999.990 1.019 ..P WKT 2010 05 24 02 24 55 31.3200 -97.3300 251.000 122.0 106.126 3.780 -999.990 -999.990 1.061 ..P WKT 2010 05 24 02 29 55 31.3200 -97.3300 251.000 457.0 100.646 3.830 -999.990 -999.990 1.006 ..P WKT 2010 05 24 02 39 55 31.3200 -97.3300 251.000 30.0 93.105 4.020 -999.990 -999.990 0.931 ..P WKT 2010 05 24 02 44 55 31.3200 -97.3300 251.000 122.0 97.964 3.470 -999.990 -999.990 0.980 ..P WKT 2010 05 24 02 49 55 31.3200 -97.3300 251.000 457.0 92.027 4.430 -999.990 -999.990 0.920 ..P WKT 2010 05 24 02 54 55 31.3200 -97.3300 251.000 30.0 92.457 6.110 -999.990 -999.990 0.925 ..P WKT 2010 05 24 02 59 55 31.3200 -97.3300 251.000 122.0 91.918 5.030 -999.990 -999.990 0.919 ..P WKT 2010 05 24 03 04 55 31.3200 -97.3300 251.000 457.0 97.332 3.420 -999.990 -999.990 0.973 ..P WKT 2010 05 24 03 14 55 31.3200 -97.3300 251.000 30.0 93.565 3.270 -999.990 -999.990 0.936 ..P WKT 2010 05 24 03 19 55 31.3200 -97.3300 251.000 122.0 92.551 4.800 -999.990 -999.990 0.926 ..P WKT 2010 05 24 03 24 55 31.3200 -97.3300 251.000 457.0 95.692 5.790 -999.990 -999.990 0.957 ..P WKT 2010 05 24 03 29 55 31.3200 -97.3300 251.000 30.0 93.570 4.500 -999.990 -999.990 0.936 ..P WKT 2010 05 24 03 34 55 31.3200 -97.3300 251.000 122.0 103.084 3.500 -999.990 -999.990 1.031 ..P WKT 2010 05 24 03 39 55 31.3200 -97.3300 251.000 457.0 96.252 3.220 -999.990 -999.990 0.963 ..P WKT 2010 05 24 03 49 55 31.3200 -97.3300 251.000 30.0 88.603 2.840 -999.990 -999.990 0.886 ..P WKT 2010 05 24 03 54 55 31.3200 -97.3300 251.000 122.0 103.860 3.120 -999.990 -999.990 1.039 ..P WKT 2010 05 24 03 59 55 31.3200 -97.3300 251.000 457.0 103.598 4.820 -999.990 -999.990 1.036 ..P WKT 2010 05 24 04 04 55 31.3200 -97.3300 251.000 30.0 97.239 4.370 -999.990 -999.990 0.972 ..P WKT 2010 05 24 04 09 55 31.3200 -97.3300 251.000 122.0 96.146 4.430 -999.990 -999.990 0.961 ..P WKT 2010 05 24 04 14 55 31.3200 -97.3300 251.000 457.0 101.983 4.410 -999.990 -999.990 1.020 ..P WKT 2010 05 24 04 24 55 31.3200 -97.3300 251.000 30.0 104.707 3.910 -999.990 -999.990 1.047 ..P WKT 2010 05 24 04 29 55 31.3200 -97.3300 251.000 122.0 101.594 4.800 -999.990 -999.990 1.016 ..P WKT 2010 05 24 04 34 55 31.3200 -97.3300 251.000 457.0 94.875 4.850 -999.990 -999.990 0.949 ..P WKT 2010 05 24 04 39 55 31.3200 -97.3300 251.000 30.0 98.417 4.640 -999.990 -999.990 0.984 ..P WKT 2010 05 24 04 44 55 31.3200 -97.3300 251.000 122.0 95.025 4.840 -999.990 -999.990 0.950 ..P WKT 2010 05 24 04 49 55 31.3200 -97.3300 251.000 457.0 96.625 5.200 -999.990 -999.990 0.966 ..P WKT 2010 05 24 05 04 55 31.3200 -97.3300 251.000 30.0 90.859 5.120 -999.990 -999.990 0.909 ..P WKT 2010 05 24 05 09 55 31.3200 -97.3300 251.000 122.0 94.389 4.800 -999.990 -999.990 0.944 ..P WKT 2010 05 24 05 14 55 31.3200 -97.3300 251.000 457.0 92.926 4.660 -999.990 -999.990 0.929 ..P WKT 2010 05 24 05 19 55 31.3200 -97.3300 251.000 30.0 95.624 4.500 -999.990 -999.990 0.956 ..P WKT 2010 05 24 05 24 55 31.3200 -97.3300 251.000 122.0 100.820 4.590 -999.990 -999.990 1.008 ..P WKT 2010 05 24 05 29 55 31.3200 -97.3300 251.000 457.0 96.859 5.450 -999.990 -999.990 0.969 ..P WKT 2010 05 24 05 39 55 31.3200 -97.3300 251.000 30.0 98.741 4.590 -999.990 -999.990 0.987 ..P WKT 2010 05 24 05 44 55 31.3200 -97.3300 251.000 122.0 101.810 3.780 -999.990 -999.990 1.018 ..P WKT 2010 05 24 05 49 55 31.3200 -97.3300 251.000 457.0 97.662 4.280 -999.990 -999.990 0.977 ..P WKT 2010 05 24 05 54 55 31.3200 -97.3300 251.000 30.0 100.037 3.980 -999.990 -999.990 1.000 ..P WKT 2010 05 24 05 59 55 31.3200 -97.3300 251.000 122.0 106.161 4.050 -999.990 -999.990 1.062 ..P WKT 2010 05 24 06 04 55 31.3200 -97.3300 251.000 457.0 100.624 5.090 -999.990 -999.990 1.006 ..P WKT 2010 05 24 06 14 55 31.3200 -97.3300 251.000 30.0 108.332 4.390 -999.990 -999.990 1.083 ..P WKT 2010 05 24 06 19 55 31.3200 -97.3300 251.000 122.0 106.444 5.350 -999.990 -999.990 1.064 ..P WKT 2010 05 24 06 24 55 31.3200 -97.3300 251.000 457.0 104.833 4.480 -999.990 -999.990 1.048 ..P WKT 2010 05 24 06 29 55 31.3200 -97.3300 251.000 30.0 101.973 4.840 -999.990 -999.990 1.020 ..P WKT 2010 05 24 06 34 55 31.3200 -97.3300 251.000 122.0 106.056 4.170 -999.990 -999.990 1.061 ..P WKT 2010 05 24 06 39 55 31.3200 -97.3300 251.000 457.0 105.557 5.010 -999.990 -999.990 1.056 ..P WKT 2010 05 24 06 49 55 31.3200 -97.3300 251.000 30.0 104.676 4.630 -999.990 -999.990 1.047 ..P WKT 2010 05 24 06 54 55 31.3200 -97.3300 251.000 122.0 109.297 3.920 -999.990 -999.990 1.093 ..P WKT 2010 05 24 06 59 55 31.3200 -97.3300 251.000 457.0 122.394 3.860 -999.990 -999.990 1.224 ..P WKT 2010 05 24 07 04 55 31.3200 -97.3300 251.000 30.0 106.590 3.700 -999.990 -999.990 1.066 ..P WKT 2010 05 24 07 09 55 31.3200 -97.3300 251.000 122.0 113.297 3.810 -999.990 -999.990 1.133 ..P WKT 2010 05 24 07 14 55 31.3200 -97.3300 251.000 457.0 124.590 4.810 -999.990 -999.990 1.246 ..P WKT 2010 05 24 07 24 55 31.3200 -97.3300 251.000 30.0 110.368 3.970 -999.990 -999.990 1.104 ..P WKT 2010 05 24 07 29 55 31.3200 -97.3300 251.000 122.0 117.653 3.830 -999.990 -999.990 1.177 ..P WKT 2010 05 24 07 34 55 31.3200 -97.3300 251.000 457.0 111.871 3.970 -999.990 -999.990 1.119 ..P WKT 2010 05 24 07 39 55 31.3200 -97.3300 251.000 30.0 110.816 4.620 -999.990 -999.990 1.108 ..P WKT 2010 05 24 07 44 55 31.3200 -97.3300 251.000 122.0 112.541 3.950 -999.990 -999.990 1.125 ..P WKT 2010 05 24 07 49 55 31.3200 -97.3300 251.000 457.0 118.159 4.990 -999.990 -999.990 1.182 ..P WKT 2010 05 24 07 59 55 31.3200 -97.3300 251.000 30.0 117.041 4.030 -999.990 -999.990 1.170 ..P WKT 2010 05 24 08 04 55 31.3200 -97.3300 251.000 122.0 122.263 4.130 -999.990 -999.990 1.223 ..P WKT 2010 05 24 08 09 55 31.3200 -97.3300 251.000 457.0 114.412 4.050 -999.990 -999.990 1.144 ..P WKT 2010 05 24 08 14 55 31.3200 -97.3300 251.000 30.0 110.455 4.750 -999.990 -999.990 1.105 ..P WKT 2010 05 24 08 19 55 31.3200 -97.3300 251.000 122.0 110.670 4.460 -999.990 -999.990 1.107 ..P WKT 2010 05 24 08 24 55 31.3200 -97.3300 251.000 457.0 114.224 4.250 -999.990 -999.990 1.142 ..P WKT 2010 05 24 08 34 55 31.3200 -97.3300 251.000 30.0 111.634 4.260 -999.990 -999.990 1.116 ..P WKT 2010 05 24 08 39 55 31.3200 -97.3300 251.000 122.0 116.343 4.190 -999.990 -999.990 1.163 ..P WKT 2010 05 24 08 44 55 31.3200 -97.3300 251.000 457.0 114.928 4.280 -999.990 -999.990 1.149 ..P WKT 2010 05 24 08 49 55 31.3200 -97.3300 251.000 30.0 113.235 5.080 -999.990 -999.990 1.132 ..P WKT 2010 05 24 08 54 55 31.3200 -97.3300 251.000 122.0 114.883 4.560 -999.990 -999.990 1.149 ..P WKT 2010 05 24 08 59 55 31.3200 -97.3300 251.000 457.0 114.303 5.430 -999.990 -999.990 1.143 ..P WKT 2010 05 24 09 09 55 31.3200 -97.3300 251.000 30.0 116.763 5.510 -999.990 -999.990 1.168 ..P WKT 2010 05 24 09 14 55 31.3200 -97.3300 251.000 122.0 114.791 4.950 -999.990 -999.990 1.148 ..P WKT 2010 05 24 09 19 55 31.3200 -97.3300 251.000 457.0 114.629 5.460 -999.990 -999.990 1.146 ..P WKT 2010 05 24 09 24 55 31.3200 -97.3300 251.000 30.0 114.189 7.350 -999.990 -999.990 1.142 ..P WKT 2010 05 24 09 29 55 31.3200 -97.3300 251.000 122.0 124.749 6.650 -999.990 -999.990 1.247 ..P WKT 2010 05 24 09 34 55 31.3200 -97.3300 251.000 457.0 118.600 6.240 -999.990 -999.990 1.186 ..P WKT 2010 05 24 09 44 55 31.3200 -97.3300 251.000 30.0 118.436 5.770 -999.990 -999.990 1.184 ..P WKT 2010 05 24 09 49 55 31.3200 -97.3300 251.000 122.0 119.686 6.070 -999.990 -999.990 1.197 ..P WKT 2010 05 24 09 54 55 31.3200 -97.3300 251.000 457.0 115.087 6.360 -999.990 -999.990 1.151 ..P WKT 2010 05 24 09 59 55 31.3200 -97.3300 251.000 30.0 118.428 7.620 -999.990 -999.990 1.184 ..P WKT 2010 05 24 10 04 55 31.3200 -97.3300 251.000 122.0 112.295 6.860 -999.990 -999.990 1.123 ..P WKT 2010 05 24 10 09 55 31.3200 -97.3300 251.000 457.0 104.768 7.070 -999.990 -999.990 1.048 ..P WKT 2010 05 24 10 19 55 31.3200 -97.3300 251.000 30.0 113.082 5.880 -999.990 -999.990 1.131 ..P WKT 2010 05 24 10 24 55 31.3200 -97.3300 251.000 122.0 124.745 7.010 -999.990 -999.990 1.247 ..P WKT 2010 05 24 10 29 55 31.3200 -97.3300 251.000 457.0 102.963 7.590 -999.990 -999.990 1.030 ..P WKT 2010 05 24 10 34 55 31.3200 -97.3300 251.000 30.0 125.219 6.510 -999.990 -999.990 1.252 ..P WKT 2010 05 24 10 39 55 31.3200 -97.3300 251.000 122.0 129.637 6.100 -999.990 -999.990 1.296 ..P WKT 2010 05 24 10 44 55 31.3200 -97.3300 251.000 457.0 113.565 5.320 -999.990 -999.990 1.136 ..P WKT 2010 05 24 10 54 55 31.3200 -97.3300 251.000 30.0 119.654 5.240 -999.990 -999.990 1.197 ..P WKT 2010 05 24 10 59 55 31.3200 -97.3300 251.000 122.0 127.738 5.650 -999.990 -999.990 1.277 ..P WKT 2010 05 24 11 04 55 31.3200 -97.3300 251.000 457.0 115.605 6.040 -999.990 -999.990 1.156 ..P WKT 2010 05 24 11 09 55 31.3200 -97.3300 251.000 30.0 121.459 5.550 -999.990 -999.990 1.215 ..P WKT 2010 05 24 11 14 55 31.3200 -97.3300 251.000 122.0 131.218 5.700 -999.990 -999.990 1.312 ..P WKT 2010 05 24 11 19 55 31.3200 -97.3300 251.000 457.0 108.623 5.340 -999.990 -999.990 1.086 ..P WKT 2010 05 24 11 29 55 31.3200 -97.3300 251.000 30.0 116.373 5.290 -999.990 -999.990 1.164 ..P WKT 2010 05 24 11 34 55 31.3200 -97.3300 251.000 122.0 123.290 5.730 -999.990 -999.990 1.233 ..P WKT 2010 05 24 11 39 55 31.3200 -97.3300 251.000 457.0 111.237 5.190 -999.990 -999.990 1.112 ..P WKT 2010 05 24 11 44 55 31.3200 -97.3300 251.000 30.0 118.154 5.260 -999.990 -999.990 1.182 ..P WKT 2010 05 24 11 49 55 31.3200 -97.3300 251.000 122.0 116.981 5.250 -999.990 -999.990 1.170 ..P WKT 2010 05 24 12 09 55 31.3200 -97.3300 251.000 457.0 112.540 6.420 -999.990 -999.990 1.125 ..P WKT 2010 05 24 12 10 25 31.3200 -97.3300 251.000 457.0 111.630 6.770 -999.990 -999.990 1.116 ..P WKT 2010 05 24 12 10 55 31.3200 -97.3300 251.000 457.0 110.441 5.160 -999.990 -999.990 1.104 ..P WKT 2010 05 24 12 11 25 31.3200 -97.3300 251.000 457.0 110.090 5.230 -999.990 -999.990 1.101 ..P WKT 2010 05 24 12 11 55 31.3200 -97.3300 251.000 457.0 112.250 5.120 -999.990 -999.990 1.123 ..P WKT 2010 05 24 12 12 25 31.3200 -97.3300 251.000 457.0 109.386 5.290 -999.990 -999.990 1.094 ..P WKT 2010 05 24 12 12 55 31.3200 -97.3300 251.000 457.0 111.825 5.110 -999.990 -999.990 1.118 ..P WKT 2010 05 24 12 13 25 31.3200 -97.3300 251.000 457.0 111.474 5.490 -999.990 -999.990 1.115 ..P WKT 2010 05 24 12 13 55 31.3200 -97.3300 251.000 457.0 110.843 5.710 -999.990 -999.990 1.108 ..P WKT 2010 05 24 12 14 25 31.3200 -97.3300 251.000 457.0 113.561 5.200 -999.990 -999.990 1.136 ..P WKT 2010 05 24 12 14 55 31.3200 -97.3300 251.000 457.0 110.977 5.450 -999.990 -999.990 1.110 ..P WKT 2010 05 24 12 19 55 31.3200 -97.3300 251.000 30.0 116.389 5.250 -999.990 -999.990 1.164 ..P WKT 2010 05 24 12 24 55 31.3200 -97.3300 251.000 122.0 120.964 6.320 -999.990 -999.990 1.210 ..P WKT 2010 05 24 12 29 55 31.3200 -97.3300 251.000 457.0 111.868 5.330 -999.990 -999.990 1.119 ..P WKT 2010 05 24 12 34 55 31.3200 -97.3300 251.000 30.0 117.838 5.730 -999.990 -999.990 1.178 ..P WKT 2010 05 24 12 39 55 31.3200 -97.3300 251.000 122.0 117.391 6.500 -999.990 -999.990 1.174 ..P WKT 2010 05 24 12 44 55 31.3200 -97.3300 251.000 457.0 105.787 5.480 -999.990 -999.990 1.058 ..P WKT 2010 05 24 12 54 55 31.3200 -97.3300 251.000 30.0 113.049 4.950 -999.990 -999.990 1.130 ..P WKT 2010 05 24 12 59 55 31.3200 -97.3300 251.000 122.0 126.892 5.110 -999.990 -999.990 1.269 ..P WKT 2010 05 24 13 04 55 31.3200 -97.3300 251.000 457.0 100.714 5.140 -999.990 -999.990 1.007 ..P WKT 2010 05 24 13 09 55 31.3200 -97.3300 251.000 30.0 119.716 5.810 -999.990 -999.990 1.197 ..P WKT 2010 05 24 13 14 55 31.3200 -97.3300 251.000 122.0 118.359 5.360 -999.990 -999.990 1.184 ..P WKT 2010 05 24 13 19 55 31.3200 -97.3300 251.000 457.0 99.993 5.810 -999.990 -999.990 1.000 ..P WKT 2010 05 24 13 29 55 31.3200 -97.3300 251.000 30.0 107.798 5.430 -999.990 -999.990 1.078 ..P WKT 2010 05 24 13 34 55 31.3200 -97.3300 251.000 122.0 121.139 5.500 -999.990 -999.990 1.211 ..P WKT 2010 05 24 13 39 55 31.3200 -97.3300 251.000 457.0 104.231 5.550 -999.990 -999.990 1.042 ..P WKT 2010 05 24 13 44 55 31.3200 -97.3300 251.000 30.0 118.546 5.890 -999.990 -999.990 1.185 ..P WKT 2010 05 24 13 49 55 31.3200 -97.3300 251.000 122.0 116.832 9.020 -999.990 -999.990 1.168 ..P WKT 2010 05 24 13 54 55 31.3200 -97.3300 251.000 457.0 105.919 5.360 -999.990 -999.990 1.059 ..P WKT 2010 05 24 14 04 55 31.3200 -97.3300 251.000 30.0 126.023 5.100 -999.990 -999.990 1.260 ..P WKT 2010 05 24 14 09 55 31.3200 -97.3300 251.000 122.0 128.749 5.360 -999.990 -999.990 1.287 ..P WKT 2010 05 24 14 14 55 31.3200 -97.3300 251.000 457.0 124.227 5.380 -999.990 -999.990 1.242 ..P WKT 2010 05 24 14 19 55 31.3200 -97.3300 251.000 30.0 105.076 5.680 -999.990 -999.990 1.051 ..P WKT 2010 05 24 14 24 55 31.3200 -97.3300 251.000 122.0 104.876 4.960 -999.990 -999.990 1.049 ..P WKT 2010 05 24 14 29 55 31.3200 -97.3300 251.000 457.0 104.537 4.820 -999.990 -999.990 1.045 ..P WKT 2010 05 24 14 39 55 31.3200 -97.3300 251.000 30.0 108.674 5.000 -999.990 -999.990 1.087 ..P WKT 2010 05 24 14 44 55 31.3200 -97.3300 251.000 122.0 104.792 5.500 -999.990 -999.990 1.048 ..P WKT 2010 05 24 14 49 55 31.3200 -97.3300 251.000 457.0 110.660 6.010 -999.990 -999.990 1.107 ..P WKT 2010 05 24 14 54 55 31.3200 -97.3300 251.000 30.0 112.210 7.060 -999.990 -999.990 1.122 ..P WKT 2010 05 24 14 59 55 31.3200 -97.3300 251.000 122.0 124.625 6.220 -999.990 -999.990 1.246 ..P WKT 2010 05 24 15 04 55 31.3200 -97.3300 251.000 457.0 110.994 5.510 -999.990 -999.990 1.110 ..P WKT 2010 05 24 15 14 55 31.3200 -97.3300 251.000 30.0 117.297 5.750 -999.990 -999.990 1.173 ..P WKT 2010 05 24 15 19 55 31.3200 -97.3300 251.000 122.0 118.151 6.110 -999.990 -999.990 1.182 ..P WKT 2010 05 24 15 24 55 31.3200 -97.3300 251.000 457.0 111.763 6.690 -999.990 -999.990 1.118 ..P WKT 2010 05 24 15 29 55 31.3200 -97.3300 251.000 30.0 108.718 6.950 -999.990 -999.990 1.087 ..P WKT 2010 05 24 15 34 55 31.3200 -97.3300 251.000 122.0 110.407 5.420 -999.990 -999.990 1.104 ..P WKT 2010 05 24 15 39 55 31.3200 -97.3300 251.000 457.0 113.489 5.270 -999.990 -999.990 1.135 ..P WKT 2010 05 24 15 49 55 31.3200 -97.3300 251.000 30.0 107.598 4.560 -999.990 -999.990 1.076 ..P WKT 2010 05 24 15 54 55 31.3200 -97.3300 251.000 122.0 112.548 5.480 -999.990 -999.990 1.125 ..P WKT 2010 05 24 15 59 55 31.3200 -97.3300 251.000 457.0 113.322 5.670 -999.990 -999.990 1.133 ..P WKT 2010 05 24 16 04 55 31.3200 -97.3300 251.000 30.0 111.591 5.490 -999.990 -999.990 1.116 ..P WKT 2010 05 24 16 09 55 31.3200 -97.3300 251.000 122.0 116.540 4.450 -999.990 -999.990 1.165 ..P WKT 2010 05 24 16 14 55 31.3200 -97.3300 251.000 457.0 116.758 4.530 -999.990 -999.990 1.168 ..P WKT 2010 05 24 16 24 55 31.3200 -97.3300 251.000 30.0 116.157 4.260 -999.990 -999.990 1.162 ..P WKT 2010 05 24 16 29 55 31.3200 -97.3300 251.000 122.0 117.010 4.300 -999.990 -999.990 1.170 ..P WKT 2010 05 24 16 34 55 31.3200 -97.3300 251.000 457.0 110.349 4.220 -999.990 -999.990 1.103 ..P WKT 2010 05 24 16 39 55 31.3200 -97.3300 251.000 30.0 114.820 4.240 -999.990 -999.990 1.148 ..P WKT 2010 05 24 16 44 55 31.3200 -97.3300 251.000 122.0 120.404 4.010 -999.990 -999.990 1.204 ..P WKT 2010 05 24 16 49 55 31.3200 -97.3300 251.000 457.0 110.126 4.230 -999.990 -999.990 1.101 ..P WKT 2010 05 24 17 04 55 31.3200 -97.3300 251.000 30.0 113.867 4.280 -999.990 -999.990 1.139 ..P WKT 2010 05 24 17 09 55 31.3200 -97.3300 251.000 122.0 112.460 4.470 -999.990 -999.990 1.125 ..P WKT 2010 05 24 17 14 55 31.3200 -97.3300 251.000 457.0 112.026 4.390 -999.990 -999.990 1.120 ..P WKT 2010 05 24 17 19 55 31.3200 -97.3300 251.000 30.0 120.354 6.040 -999.990 -999.990 1.204 ..P WKT 2010 05 24 17 24 55 31.3200 -97.3300 251.000 122.0 114.774 4.040 -999.990 -999.990 1.148 ..P WKT 2010 05 24 17 29 55 31.3200 -97.3300 251.000 457.0 106.831 4.230 -999.990 -999.990 1.068 ..P WKT 2010 05 24 17 39 55 31.3200 -97.3300 251.000 30.0 121.315 4.120 -999.990 -999.990 1.213 ..P WKT 2010 05 24 17 44 55 31.3200 -97.3300 251.000 122.0 123.438 4.150 -999.990 -999.990 1.234 ..P WKT 2010 05 24 17 49 55 31.3200 -97.3300 251.000 457.0 122.224 5.020 -999.990 -999.990 1.222 ..P WKT 2010 05 24 17 54 55 31.3200 -97.3300 251.000 30.0 109.193 4.790 -999.990 -999.990 1.092 ..P WKT 2010 05 24 17 59 55 31.3200 -97.3300 251.000 122.0 118.129 5.130 -999.990 -999.990 1.181 ..P WKT 2010 05 24 18 04 55 31.3200 -97.3300 251.000 457.0 112.328 4.420 -999.990 -999.990 1.123 ..P WKT 2010 05 24 18 14 55 31.3200 -97.3300 251.000 30.0 114.053 4.660 -999.990 -999.990 1.141 ..P WKT 2010 05 24 18 19 55 31.3200 -97.3300 251.000 122.0 118.241 5.540 -999.990 -999.990 1.182 ..P WKT 2010 05 24 18 24 55 31.3200 -97.3300 251.000 457.0 114.923 4.650 -999.990 -999.990 1.149 ..P WKT 2010 05 24 18 29 55 31.3200 -97.3300 251.000 30.0 112.439 4.950 -999.990 -999.990 1.124 ..P WKT 2010 05 24 18 34 55 31.3200 -97.3300 251.000 122.0 117.321 4.380 -999.990 -999.990 1.173 ..P WKT 2010 05 24 18 39 55 31.3200 -97.3300 251.000 457.0 115.255 4.300 -999.990 -999.990 1.153 ..P WKT 2010 05 24 18 49 55 31.3200 -97.3300 251.000 30.0 112.215 4.990 -999.990 -999.990 1.122 ..P WKT 2010 05 24 18 54 55 31.3200 -97.3300 251.000 122.0 116.103 4.100 -999.990 -999.990 1.161 ..P WKT 2010 05 24 18 59 55 31.3200 -97.3300 251.000 457.0 114.017 4.350 -999.990 -999.990 1.140 ..P WKT 2010 05 24 19 04 55 31.3200 -97.3300 251.000 30.0 114.155 3.860 -999.990 -999.990 1.142 ..P WKT 2010 05 24 19 09 55 31.3200 -97.3300 251.000 122.0 115.681 3.870 -999.990 -999.990 1.157 ..P WKT 2010 05 24 19 14 55 31.3200 -97.3300 251.000 457.0 124.153 4.370 -999.990 -999.990 1.242 ..P WKT 2010 05 24 19 24 55 31.3200 -97.3300 251.000 30.0 113.950 4.020 -999.990 -999.990 1.139 ..P WKT 2010 05 24 19 29 55 31.3200 -97.3300 251.000 122.0 126.111 4.210 -999.990 -999.990 1.261 ..P WKT 2010 05 24 19 34 55 31.3200 -97.3300 251.000 457.0 119.661 3.930 -999.990 -999.990 1.197 ..P WKT 2010 05 24 19 39 55 31.3200 -97.3300 251.000 30.0 124.877 3.860 -999.990 -999.990 1.249 ..P WKT 2010 05 24 19 44 55 31.3200 -97.3300 251.000 122.0 122.315 4.260 -999.990 -999.990 1.223 ..P WKT 2010 05 24 19 49 55 31.3200 -97.3300 251.000 457.0 123.087 3.800 -999.990 -999.990 1.231 ..P WKT 2010 05 24 19 59 55 31.3200 -97.3300 251.000 30.0 126.534 3.840 -999.990 -999.990 1.265 ..P WKT 2010 05 24 20 04 55 31.3200 -97.3300 251.000 122.0 125.878 4.160 -999.990 -999.990 1.259 ..P WKT 2010 05 24 20 09 55 31.3200 -97.3300 251.000 457.0 124.943 6.140 -999.990 -999.990 1.249 ..P WKT 2010 05 24 20 14 55 31.3200 -97.3300 251.000 30.0 119.843 7.780 -999.990 -999.990 1.198 ..P WKT 2010 05 24 20 19 55 31.3200 -97.3300 251.000 122.0 120.853 7.240 -999.990 -999.990 1.209 ..P WKT 2010 05 24 20 24 55 31.3200 -97.3300 251.000 457.0 118.808 5.300 -999.990 -999.990 1.188 ..P WKT 2010 05 24 20 34 55 31.3200 -97.3300 251.000 30.0 113.312 5.660 -999.990 -999.990 1.133 ..P WKT 2010 05 24 20 39 55 31.3200 -97.3300 251.000 122.0 117.633 7.200 -999.990 -999.990 1.176 ..P WKT 2010 05 24 20 44 55 31.3200 -97.3300 251.000 457.0 101.969 8.230 -999.990 -999.990 1.020 ..P WKT 2010 05 24 20 49 55 31.3200 -97.3300 251.000 30.0 111.841 7.040 -999.990 -999.990 1.118 ..P WKT 2010 05 24 20 54 55 31.3200 -97.3300 251.000 122.0 119.769 6.130 -999.990 -999.990 1.198 ..P WKT 2010 05 24 20 59 55 31.3200 -97.3300 251.000 457.0 110.768 4.680 -999.990 -999.990 1.108 ..P WKT 2010 05 24 21 09 55 31.3200 -97.3300 251.000 30.0 124.163 4.430 -999.990 -999.990 1.242 ..P WKT 2010 05 24 21 14 55 31.3200 -97.3300 251.000 122.0 124.498 6.570 -999.990 -999.990 1.245 ..P WKT 2010 05 24 21 19 55 31.3200 -97.3300 251.000 457.0 108.740 7.080 -999.990 -999.990 1.087 ..P WKT 2010 05 24 21 24 55 31.3200 -97.3300 251.000 30.0 114.348 6.190 -999.990 -999.990 1.143 ..P WKT 2010 05 24 21 29 55 31.3200 -97.3300 251.000 122.0 113.434 5.530 -999.990 -999.990 1.134 ..P WKT 2010 05 24 21 34 55 31.3200 -97.3300 251.000 457.0 112.521 6.120 -999.990 -999.990 1.125 ..P WKT 2010 05 24 21 44 55 31.3200 -97.3300 251.000 30.0 116.917 6.170 -999.990 -999.990 1.169 ..P WKT 2010 05 24 21 49 55 31.3200 -97.3300 251.000 122.0 113.349 5.540 -999.990 -999.990 1.133 ..P WKT 2010 05 24 21 54 55 31.3200 -97.3300 251.000 457.0 107.840 5.200 -999.990 -999.990 1.078 ..P WKT 2010 05 24 22 00 55 31.3200 -97.3300 251.000 30.0 112.823 4.340 -999.990 -999.990 1.128 ..P WKT 2010 05 24 22 01 25 31.3200 -97.3300 251.000 30.0 112.105 4.240 -999.990 -999.990 1.121 ..P WKT 2010 05 24 22 01 55 31.3200 -97.3300 251.000 30.0 110.556 4.250 -999.990 -999.990 1.106 ..P WKT 2010 05 24 22 02 25 31.3200 -97.3300 251.000 30.0 111.226 4.190 -999.990 -999.990 1.112 ..P WKT 2010 05 24 22 02 55 31.3200 -97.3300 251.000 30.0 110.232 4.210 -999.990 -999.990 1.102 ..P WKT 2010 05 24 22 03 25 31.3200 -97.3300 251.000 30.0 112.010 4.180 -999.990 -999.990 1.120 ..P WKT 2010 05 24 22 03 55 31.3200 -97.3300 251.000 30.0 109.629 4.130 -999.990 -999.990 1.096 ..P WKT 2010 05 24 22 04 25 31.3200 -97.3300 251.000 30.0 117.231 4.630 -999.990 -999.990 1.172 ..P WKT 2010 05 24 22 04 55 31.3200 -97.3300 251.000 30.0 117.623 4.430 -999.990 -999.990 1.176 ..P WKT 2010 05 24 22 09 55 31.3200 -97.3300 251.000 457.0 113.502 4.010 -999.990 -999.990 1.135 ..P WKT 2010 05 24 22 19 55 31.3200 -97.3300 251.000 30.0 117.004 3.300 -999.990 -999.990 1.170 ..P WKT 2010 05 24 22 24 55 31.3200 -97.3300 251.000 122.0 120.190 4.230 -999.990 -999.990 1.202 ..P WKT 2010 05 24 22 29 55 31.3200 -97.3300 251.000 457.0 115.060 3.910 -999.990 -999.990 1.151 ..P WKT 2010 05 24 22 34 55 31.3200 -97.3300 251.000 30.0 112.701 3.110 -999.990 -999.990 1.127 ..P WKT 2010 05 24 22 39 55 31.3200 -97.3300 251.000 122.0 120.324 3.010 -999.990 -999.990 1.203 ..P WKT 2010 05 24 22 44 55 31.3200 -97.3300 251.000 457.0 109.372 3.840 -999.990 -999.990 1.094 ..P WKT 2010 05 24 22 54 55 31.3200 -97.3300 251.000 30.0 118.002 3.430 -999.990 -999.990 1.180 ..P WKT 2010 05 24 22 59 55 31.3200 -97.3300 251.000 122.0 116.792 3.560 -999.990 -999.990 1.168 ..P WKT 2010 05 24 23 04 55 31.3200 -97.3300 251.000 457.0 109.209 3.330 -999.990 -999.990 1.092 ..P WKT 2010 05 24 23 09 55 31.3200 -97.3300 251.000 30.0 107.724 4.440 -999.990 -999.990 1.077 ..P WKT 2010 05 24 23 14 55 31.3200 -97.3300 251.000 122.0 112.334 4.000 -999.990 -999.990 1.123 ..P WKT 2010 05 24 23 19 55 31.3200 -97.3300 251.000 457.0 107.523 4.100 -999.990 -999.990 1.075 ..P WKT 2010 05 24 23 29 55 31.3200 -97.3300 251.000 30.0 112.481 4.040 -999.990 -999.990 1.125 ..P WKT 2010 05 24 23 34 55 31.3200 -97.3300 251.000 122.0 115.045 3.800 -999.990 -999.990 1.150 ..P WKT 2010 05 24 23 39 55 31.3200 -97.3300 251.000 457.0 110.405 4.000 -999.990 -999.990 1.104 ..P WKT 2010 05 24 23 44 55 31.3200 -97.3300 251.000 30.0 117.400 3.270 -999.990 -999.990 1.174 ..P WKT 2010 05 24 23 49 55 31.3200 -97.3300 251.000 122.0 122.041 3.220 -999.990 -999.990 1.220 ..P WKT 2010 05 25 00 09 55 31.3200 -97.3300 251.000 457.0 110.861 3.100 -999.990 -999.990 1.109 ..P WKT 2010 05 25 00 10 25 31.3200 -97.3300 251.000 457.0 111.565 2.830 -999.990 -999.990 1.116 ..P WKT 2010 05 25 00 10 55 31.3200 -97.3300 251.000 457.0 111.439 3.270 -999.990 -999.990 1.114 ..P WKT 2010 05 25 00 11 25 31.3200 -97.3300 251.000 457.0 110.066 3.220 -999.990 -999.990 1.101 ..P WKT 2010 05 25 00 11 55 31.3200 -97.3300 251.000 457.0 113.955 3.100 -999.990 -999.990 1.140 ..P WKT 2010 05 25 00 12 25 31.3200 -97.3300 251.000 457.0 111.890 2.590 -999.990 -999.990 1.119 ..P WKT 2010 05 25 00 12 55 31.3200 -97.3300 251.000 457.0 109.132 3.020 -999.990 -999.990 1.091 ..P WKT 2010 05 25 00 13 25 31.3200 -97.3300 251.000 457.0 106.790 3.110 -999.990 -999.990 1.068 ..P WKT 2010 05 25 00 13 55 31.3200 -97.3300 251.000 457.0 110.125 3.890 -999.990 -999.990 1.101 ..P WKT 2010 05 25 00 14 25 31.3200 -97.3300 251.000 457.0 109.722 3.840 -999.990 -999.990 1.097 ..P WKT 2010 05 25 00 14 55 31.3200 -97.3300 251.000 457.0 110.842 3.780 -999.990 -999.990 1.108 ..P WKT 2010 05 25 00 19 55 31.3200 -97.3300 251.000 30.0 114.007 3.740 -999.990 -999.990 1.140 ..P WKT 2010 05 25 00 24 55 31.3200 -97.3300 251.000 122.0 114.958 3.340 -999.990 -999.990 1.150 ..P WKT 2010 05 25 00 29 55 31.3200 -97.3300 251.000 457.0 105.799 3.890 -999.990 -999.990 1.058 ..P WKT 2010 05 25 00 34 55 31.3200 -97.3300 251.000 30.0 108.273 3.640 -999.990 -999.990 1.083 ..P WKT 2010 05 25 00 39 55 31.3200 -97.3300 251.000 122.0 116.977 3.400 -999.990 -999.990 1.170 ..P WKT 2010 05 25 00 44 55 31.3200 -97.3300 251.000 457.0 108.234 2.900 -999.990 -999.990 1.082 ..P WKT 2010 05 25 00 54 55 31.3200 -97.3300 251.000 30.0 105.853 3.470 -999.990 -999.990 1.059 ..P WKT 2010 05 25 00 59 55 31.3200 -97.3300 251.000 122.0 104.599 3.710 -999.990 -999.990 1.046 ..P WKT 2010 05 25 01 04 55 31.3200 -97.3300 251.000 457.0 107.222 4.220 -999.990 -999.990 1.072 ..P WKT 2010 05 25 01 09 55 31.3200 -97.3300 251.000 30.0 110.813 3.410 -999.990 -999.990 1.108 ..P WKT 2010 05 25 01 14 55 31.3200 -97.3300 251.000 122.0 114.683 2.560 -999.990 -999.990 1.147 ..P WKT 2010 05 25 01 19 55 31.3200 -97.3300 251.000 457.0 115.644 4.760 -999.990 -999.990 1.156 ..P WKT 2010 05 25 01 29 55 31.3200 -97.3300 251.000 30.0 119.742 3.580 -999.990 -999.990 1.197 ..P WKT 2010 05 25 01 34 55 31.3200 -97.3300 251.000 122.0 117.340 2.210 -999.990 -999.990 1.173 ..P WKT 2010 05 25 01 39 55 31.3200 -97.3300 251.000 457.0 112.170 2.330 -999.990 -999.990 1.122 ..P WKT 2010 05 25 01 44 55 31.3200 -97.3300 251.000 30.0 108.383 3.070 -999.990 -999.990 1.084 ..P WKT 2010 05 25 01 49 55 31.3200 -97.3300 251.000 122.0 112.904 2.670 -999.990 -999.990 1.129 ..P WKT 2010 05 25 01 54 55 31.3200 -97.3300 251.000 457.0 113.826 4.080 -999.990 -999.990 1.138 ..P WKT 2010 05 25 02 04 55 31.3200 -97.3300 251.000 30.0 115.511 3.070 -999.990 -999.990 1.155 ..P WKT 2010 05 25 02 09 55 31.3200 -97.3300 251.000 122.0 114.613 3.220 -999.990 -999.990 1.146 ..P WKT 2010 05 25 02 14 55 31.3200 -97.3300 251.000 457.0 112.330 5.260 -999.990 -999.990 1.123 ..P WKT 2010 05 25 02 19 55 31.3200 -97.3300 251.000 30.0 109.217 3.090 -999.990 -999.990 1.092 ..P WKT 2010 05 25 02 24 55 31.3200 -97.3300 251.000 122.0 107.211 2.710 -999.990 -999.990 1.072 ..P WKT 2010 05 25 02 29 55 31.3200 -97.3300 251.000 457.0 114.066 2.880 -999.990 -999.990 1.141 ..P WKT 2010 05 25 02 39 55 31.3200 -97.3300 251.000 30.0 114.959 2.810 -999.990 -999.990 1.150 ..P WKT 2010 05 25 02 44 55 31.3200 -97.3300 251.000 122.0 118.412 4.240 -999.990 -999.990 1.184 ..P WKT 2010 05 25 02 49 55 31.3200 -97.3300 251.000 457.0 105.530 2.140 -999.990 -999.990 1.055 ..P WKT 2010 05 25 02 54 55 31.3200 -97.3300 251.000 30.0 110.366 3.100 -999.990 -999.990 1.104 ..P WKT 2010 05 25 02 59 55 31.3200 -97.3300 251.000 122.0 110.774 2.980 -999.990 -999.990 1.108 ..P WKT 2010 05 25 03 04 55 31.3200 -97.3300 251.000 457.0 108.412 3.410 -999.990 -999.990 1.084 ..P WKT 2010 05 25 03 14 55 31.3200 -97.3300 251.000 30.0 114.685 2.020 -999.990 -999.990 1.147 ..P WKT 2010 05 25 03 19 55 31.3200 -97.3300 251.000 122.0 113.352 3.470 -999.990 -999.990 1.134 ..P WKT 2010 05 25 03 24 55 31.3200 -97.3300 251.000 457.0 102.883 3.880 -999.990 -999.990 1.029 ..P WKT 2010 05 25 03 29 55 31.3200 -97.3300 251.000 30.0 111.378 2.310 -999.990 -999.990 1.114 ..P WKT 2010 05 25 03 34 55 31.3200 -97.3300 251.000 122.0 116.274 3.090 -999.990 -999.990 1.163 ..P WKT 2010 05 25 03 39 55 31.3200 -97.3300 251.000 457.0 103.175 2.970 -999.990 -999.990 1.032 ..P WKT 2010 05 25 03 49 55 31.3200 -97.3300 251.000 30.0 115.201 3.770 -999.990 -999.990 1.152 ..P WKT 2010 05 25 03 54 55 31.3200 -97.3300 251.000 122.0 110.013 3.900 -999.990 -999.990 1.100 ..P WKT 2010 05 25 03 59 55 31.3200 -97.3300 251.000 457.0 110.360 3.120 -999.990 -999.990 1.104 ..P WKT 2010 05 25 04 04 55 31.3200 -97.3300 251.000 30.0 110.570 2.580 -999.990 -999.990 1.106 ..P WKT 2010 05 25 04 09 55 31.3200 -97.3300 251.000 122.0 121.714 2.950 -999.990 -999.990 1.217 ..P WKT 2010 05 25 04 14 55 31.3200 -97.3300 251.000 457.0 113.757 3.870 -999.990 -999.990 1.138 ..P WKT 2010 05 25 04 24 55 31.3200 -97.3300 251.000 30.0 113.681 3.410 -999.990 -999.990 1.137 ..P WKT 2010 05 25 04 29 55 31.3200 -97.3300 251.000 122.0 119.072 3.280 -999.990 -999.990 1.191 ..P WKT 2010 05 25 04 34 55 31.3200 -97.3300 251.000 457.0 108.268 2.570 -999.990 -999.990 1.083 ..P WKT 2010 05 25 04 39 55 31.3200 -97.3300 251.000 30.0 120.854 3.900 -999.990 -999.990 1.209 ..P WKT 2010 05 25 04 44 55 31.3200 -97.3300 251.000 122.0 124.168 3.000 -999.990 -999.990 1.242 ..P WKT 2010 05 25 04 49 55 31.3200 -97.3300 251.000 457.0 111.289 3.040 -999.990 -999.990 1.113 ..P WKT 2010 05 25 05 04 55 31.3200 -97.3300 251.000 30.0 118.950 3.840 -999.990 -999.990 1.190 ..P WKT 2010 05 25 05 09 55 31.3200 -97.3300 251.000 122.0 118.494 3.730 -999.990 -999.990 1.185 ..P WKT 2010 05 25 05 14 55 31.3200 -97.3300 251.000 457.0 141.428 9.510 -999.990 -999.990 1.414 ..P WKT 2010 05 25 05 19 55 31.3200 -97.3300 251.000 30.0 115.370 4.070 -999.990 -999.990 1.154 ..P WKT 2010 05 25 05 24 55 31.3200 -97.3300 251.000 122.0 107.302 2.720 -999.990 -999.990 1.073 ..P WKT 2010 05 25 05 29 55 31.3200 -97.3300 251.000 457.0 108.093 3.350 -999.990 -999.990 1.081 ..P WKT 2010 05 25 05 39 55 31.3200 -97.3300 251.000 30.0 103.833 2.390 -999.990 -999.990 1.038 ..P WKT 2010 05 25 05 44 55 31.3200 -97.3300 251.000 122.0 108.748 3.060 -999.990 -999.990 1.087 ..P WKT 2010 05 25 05 49 55 31.3200 -97.3300 251.000 457.0 114.216 3.170 -999.990 -999.990 1.142 ..P WKT 2010 05 25 05 54 55 31.3200 -97.3300 251.000 30.0 101.418 2.870 -999.990 -999.990 1.014 ..P WKT 2010 05 25 05 59 55 31.3200 -97.3300 251.000 122.0 115.465 4.720 -999.990 -999.990 1.155 ..P WKT 2010 05 25 06 04 55 31.3200 -97.3300 251.000 457.0 111.246 3.380 -999.990 -999.990 1.112 ..P WKT 2010 05 25 06 14 55 31.3200 -97.3300 251.000 30.0 109.135 4.390 -999.990 -999.990 1.091 ..P WKT 2010 05 25 06 19 55 31.3200 -97.3300 251.000 122.0 117.331 3.260 -999.990 -999.990 1.173 ..P WKT 2010 05 25 06 24 55 31.3200 -97.3300 251.000 457.0 118.053 2.630 -999.990 -999.990 1.181 ..P WKT 2010 05 25 06 29 55 31.3200 -97.3300 251.000 30.0 106.600 3.090 -999.990 -999.990 1.066 ..P WKT 2010 05 25 06 34 55 31.3200 -97.3300 251.000 122.0 107.323 2.150 -999.990 -999.990 1.073 ..P WKT 2010 05 25 06 39 55 31.3200 -97.3300 251.000 457.0 112.198 2.100 -999.990 -999.990 1.122 ..P WKT 2010 05 25 06 49 55 31.3200 -97.3300 251.000 30.0 113.269 2.350 -999.990 -999.990 1.133 ..P WKT 2010 05 25 06 54 55 31.3200 -97.3300 251.000 122.0 131.327 2.270 -999.990 -999.990 1.313 ..P WKT 2010 05 25 06 59 55 31.3200 -97.3300 251.000 457.0 108.153 2.540 -999.990 -999.990 1.082 ..P WKT 2010 05 25 07 04 55 31.3200 -97.3300 251.000 30.0 117.633 2.500 -999.990 -999.990 1.176 ..P WKT 2010 05 25 07 09 55 31.3200 -97.3300 251.000 122.0 119.641 3.170 -999.990 -999.990 1.196 ..P WKT 2010 05 25 07 14 55 31.3200 -97.3300 251.000 457.0 110.027 2.970 -999.990 -999.990 1.100 ..P WKT 2010 05 25 07 24 55 31.3200 -97.3300 251.000 30.0 116.632 4.010 -999.990 -999.990 1.166 ..P WKT 2010 05 25 07 29 55 31.3200 -97.3300 251.000 122.0 119.707 2.130 -999.990 -999.990 1.197 ..P WKT 2010 05 25 07 34 55 31.3200 -97.3300 251.000 457.0 109.639 2.710 -999.990 -999.990 1.096 ..P WKT 2010 05 25 07 39 55 31.3200 -97.3300 251.000 30.0 120.600 3.660 -999.990 -999.990 1.206 ..P WKT 2010 05 25 07 44 55 31.3200 -97.3300 251.000 122.0 115.236 3.160 -999.990 -999.990 1.152 ..P WKT 2010 05 25 07 49 55 31.3200 -97.3300 251.000 457.0 108.765 3.300 -999.990 -999.990 1.088 ..P WKT 2010 05 25 07 59 55 31.3200 -97.3300 251.000 30.0 120.903 3.830 -999.990 -999.990 1.209 ..P WKT 2010 05 25 08 04 55 31.3200 -97.3300 251.000 122.0 120.421 3.460 -999.990 -999.990 1.204 ..P WKT 2010 05 25 08 09 55 31.3200 -97.3300 251.000 457.0 107.764 3.440 -999.990 -999.990 1.078 ..P WKT 2010 05 25 08 14 55 31.3200 -97.3300 251.000 30.0 125.266 2.720 -999.990 -999.990 1.253 ..P WKT 2010 05 25 08 19 55 31.3200 -97.3300 251.000 122.0 123.539 4.260 -999.990 -999.990 1.235 ..P WKT 2010 05 25 08 24 55 31.3200 -97.3300 251.000 457.0 109.776 2.340 -999.990 -999.990 1.098 ..P WKT 2010 05 25 08 34 55 31.3200 -97.3300 251.000 30.0 126.775 2.330 -999.990 -999.990 1.268 ..P WKT 2010 05 25 08 39 55 31.3200 -97.3300 251.000 122.0 131.529 2.890 -999.990 -999.990 1.315 ..P WKT 2010 05 25 08 44 55 31.3200 -97.3300 251.000 457.0 108.617 3.920 -999.990 -999.990 1.086 ..P WKT 2010 05 25 08 49 55 31.3200 -97.3300 251.000 30.0 121.533 2.840 -999.990 -999.990 1.215 ..P WKT 2010 05 25 08 54 55 31.3200 -97.3300 251.000 122.0 122.138 4.560 -999.990 -999.990 1.221 ..P WKT 2010 05 25 08 59 55 31.3200 -97.3300 251.000 457.0 106.696 3.840 -999.990 -999.990 1.067 ..P WKT 2010 05 25 09 09 55 31.3200 -97.3300 251.000 30.0 129.819 3.450 -999.990 -999.990 1.298 ..P WKT 2010 05 25 09 14 55 31.3200 -97.3300 251.000 122.0 128.685 2.990 -999.990 -999.990 1.287 ..P WKT 2010 05 25 09 19 55 31.3200 -97.3300 251.000 457.0 109.292 2.470 -999.990 -999.990 1.093 ..P WKT 2010 05 25 09 24 55 31.3200 -97.3300 251.000 30.0 121.160 3.240 -999.990 -999.990 1.212 ..P WKT 2010 05 25 09 29 55 31.3200 -97.3300 251.000 122.0 118.365 2.730 -999.990 -999.990 1.184 ..P WKT 2010 05 25 09 34 55 31.3200 -97.3300 251.000 457.0 107.549 2.610 -999.990 -999.990 1.075 ..P WKT 2010 05 25 09 44 55 31.3200 -97.3300 251.000 30.0 123.972 1.990 -999.990 -999.990 1.240 ..P WKT 2010 05 25 09 49 55 31.3200 -97.3300 251.000 122.0 118.571 3.270 -999.990 -999.990 1.186 ..P WKT 2010 05 25 09 54 55 31.3200 -97.3300 251.000 457.0 109.572 3.990 -999.990 -999.990 1.096 ..P WKT 2010 05 25 09 59 55 31.3200 -97.3300 251.000 30.0 134.044 3.500 -999.990 -999.990 1.340 ..P WKT 2010 05 25 10 04 55 31.3200 -97.3300 251.000 122.0 130.301 3.160 -999.990 -999.990 1.303 ..P WKT 2010 05 25 10 09 55 31.3200 -97.3300 251.000 457.0 114.112 2.780 -999.990 -999.990 1.141 ..P WKT 2010 05 25 10 19 55 31.3200 -97.3300 251.000 30.0 135.750 2.250 -999.990 -999.990 1.357 ..P WKT 2010 05 25 10 24 55 31.3200 -97.3300 251.000 122.0 122.129 3.280 -999.990 -999.990 1.221 ..P WKT 2010 05 25 10 29 55 31.3200 -97.3300 251.000 457.0 120.955 3.520 -999.990 -999.990 1.210 ..P WKT 2010 05 25 10 34 55 31.3200 -97.3300 251.000 30.0 136.377 3.120 -999.990 -999.990 1.364 ..P WKT 2010 05 25 10 39 55 31.3200 -97.3300 251.000 122.0 131.883 3.400 -999.990 -999.990 1.319 ..P WKT 2010 05 25 10 44 55 31.3200 -97.3300 251.000 457.0 117.987 4.280 -999.990 -999.990 1.180 ..P WKT 2010 05 25 10 54 55 31.3200 -97.3300 251.000 30.0 135.730 3.960 -999.990 -999.990 1.357 ..P WKT 2010 05 25 10 59 55 31.3200 -97.3300 251.000 122.0 129.756 3.540 -999.990 -999.990 1.298 ..P WKT 2010 05 25 11 04 55 31.3200 -97.3300 251.000 457.0 116.314 3.260 -999.990 -999.990 1.163 ..P WKT 2010 05 25 11 09 55 31.3200 -97.3300 251.000 30.0 126.658 2.730 -999.990 -999.990 1.267 ..P WKT 2010 05 25 11 14 55 31.3200 -97.3300 251.000 122.0 123.727 4.020 -999.990 -999.990 1.237 ..P WKT 2010 05 25 11 19 55 31.3200 -97.3300 251.000 457.0 111.391 2.280 -999.990 -999.990 1.114 ..P WKT 2010 05 25 11 29 55 31.3200 -97.3300 251.000 30.0 124.252 2.040 -999.990 -999.990 1.243 ..P WKT 2010 05 25 11 34 55 31.3200 -97.3300 251.000 122.0 120.133 2.250 -999.990 -999.990 1.201 ..P WKT 2010 05 25 11 39 55 31.3200 -97.3300 251.000 457.0 119.333 2.290 -999.990 -999.990 1.193 ..P WKT 2010 05 25 11 44 55 31.3200 -97.3300 251.000 30.0 131.115 2.570 -999.990 -999.990 1.311 ..P WKT 2010 05 25 11 49 55 31.3200 -97.3300 251.000 122.0 130.728 3.270 -999.990 -999.990 1.307 ..P WKT 2010 05 25 12 09 55 31.3200 -97.3300 251.000 457.0 118.518 2.480 -999.990 -999.990 1.185 ..P WKT 2010 05 25 12 10 25 31.3200 -97.3300 251.000 457.0 116.464 3.040 -999.990 -999.990 1.165 ..P WKT 2010 05 25 12 10 55 31.3200 -97.3300 251.000 457.0 118.420 2.850 -999.990 -999.990 1.184 ..P WKT 2010 05 25 12 11 25 31.3200 -97.3300 251.000 457.0 123.419 3.610 -999.990 -999.990 1.234 ..P WKT 2010 05 25 12 11 55 31.3200 -97.3300 251.000 457.0 122.886 3.100 -999.990 -999.990 1.229 ..P WKT 2010 05 25 12 12 25 31.3200 -97.3300 251.000 457.0 121.108 2.260 -999.990 -999.990 1.211 ..P WKT 2010 05 25 12 12 55 31.3200 -97.3300 251.000 457.0 123.341 2.630 -999.990 -999.990 1.233 ..P WKT 2010 05 25 12 13 25 31.3200 -97.3300 251.000 457.0 125.436 2.500 -999.990 -999.990 1.254 ..P WKT 2010 05 25 12 13 55 31.3200 -97.3300 251.000 457.0 123.104 2.310 -999.990 -999.990 1.231 ..P WKT 2010 05 25 12 14 25 31.3200 -97.3300 251.000 457.0 122.848 2.230 -999.990 -999.990 1.228 ..P WKT 2010 05 25 12 14 55 31.3200 -97.3300 251.000 457.0 123.283 2.320 -999.990 -999.990 1.233 ..P WKT 2010 05 25 12 19 55 31.3200 -97.3300 251.000 30.0 140.081 2.660 -999.990 -999.990 1.401 ..P WKT 2010 05 25 12 24 55 31.3200 -97.3300 251.000 122.0 140.284 4.130 -999.990 -999.990 1.403 ..P WKT 2010 05 25 12 29 55 31.3200 -97.3300 251.000 457.0 122.088 3.760 -999.990 -999.990 1.221 ..P WKT 2010 05 25 12 34 55 31.3200 -97.3300 251.000 30.0 155.352 5.860 -999.990 -999.990 1.554 ..P WKT 2010 05 25 12 39 55 31.3200 -97.3300 251.000 122.0 166.899 4.440 -999.990 -999.990 1.669 ..P WKT 2010 05 25 12 44 55 31.3200 -97.3300 251.000 457.0 132.376 2.460 -999.990 -999.990 1.324 ..P WKT 2010 05 25 12 54 55 31.3200 -97.3300 251.000 30.0 140.867 2.890 -999.990 -999.990 1.409 ..P WKT 2010 05 25 12 59 55 31.3200 -97.3300 251.000 122.0 140.578 5.780 -999.990 -999.990 1.406 ..P WKT 2010 05 25 13 04 55 31.3200 -97.3300 251.000 457.0 127.556 3.520 -999.990 -999.990 1.276 ..P WKT 2010 05 25 13 09 55 31.3200 -97.3300 251.000 30.0 134.877 3.510 -999.990 -999.990 1.349 ..P WKT 2010 05 25 13 14 55 31.3200 -97.3300 251.000 122.0 142.753 3.440 -999.990 -999.990 1.428 ..P WKT 2010 05 25 13 19 55 31.3200 -97.3300 251.000 457.0 130.282 3.170 -999.990 -999.990 1.303 ..P WKT 2010 05 25 13 29 55 31.3200 -97.3300 251.000 30.0 143.822 4.470 -999.990 -999.990 1.438 ..P WKT 2010 05 25 13 34 55 31.3200 -97.3300 251.000 122.0 149.069 3.300 -999.990 -999.990 1.491 ..P WKT 2010 05 25 13 39 55 31.3200 -97.3300 251.000 457.0 118.321 2.700 -999.990 -999.990 1.183 ..P WKT 2010 05 25 13 44 55 31.3200 -97.3300 251.000 30.0 144.891 2.840 -999.990 -999.990 1.449 ..P WKT 2010 05 25 13 49 55 31.3200 -97.3300 251.000 122.0 133.524 3.110 -999.990 -999.990 1.335 ..P WKT 2010 05 25 13 54 55 31.3200 -97.3300 251.000 457.0 114.955 4.030 -999.990 -999.990 1.150 ..P WKT 2010 05 25 14 04 55 31.3200 -97.3300 251.000 30.0 131.822 1.930 -999.990 -999.990 1.318 ..P WKT 2010 05 25 14 09 55 31.3200 -97.3300 251.000 122.0 130.977 3.010 -999.990 -999.990 1.310 ..P WKT 2010 05 25 14 14 55 31.3200 -97.3300 251.000 457.0 115.728 4.070 -999.990 -999.990 1.157 ..P WKT 2010 05 25 14 19 55 31.3200 -97.3300 251.000 30.0 119.869 2.940 -999.990 -999.990 1.199 ..P WKT 2010 05 25 14 24 55 31.3200 -97.3300 251.000 122.0 124.841 1.860 -999.990 -999.990 1.248 ..P WKT 2010 05 25 14 29 55 31.3200 -97.3300 251.000 457.0 118.178 2.030 -999.990 -999.990 1.182 ..P WKT 2010 05 25 14 39 55 31.3200 -97.3300 251.000 30.0 114.467 2.900 -999.990 -999.990 1.145 ..P WKT 2010 05 25 14 44 55 31.3200 -97.3300 251.000 122.0 116.590 4.110 -999.990 -999.990 1.166 ..P WKT 2010 05 25 14 49 55 31.3200 -97.3300 251.000 457.0 109.291 3.100 -999.990 -999.990 1.093 ..P WKT 2010 05 25 14 54 55 31.3200 -97.3300 251.000 30.0 114.463 2.740 -999.990 -999.990 1.145 ..P WKT 2010 05 25 14 59 55 31.3200 -97.3300 251.000 122.0 125.179 3.760 -999.990 -999.990 1.252 ..P WKT 2010 05 25 15 04 55 31.3200 -97.3300 251.000 457.0 117.324 4.450 -999.990 -999.990 1.173 ..P WKT 2010 05 25 15 14 55 31.3200 -97.3300 251.000 30.0 117.236 4.580 -999.990 -999.990 1.172 ..P WKT 2010 05 25 15 19 55 31.3200 -97.3300 251.000 122.0 121.122 4.090 -999.990 -999.990 1.211 ..P WKT 2010 05 25 15 24 55 31.3200 -97.3300 251.000 457.0 119.742 5.040 -999.990 -999.990 1.197 ..P WKT 2010 05 25 15 29 55 31.3200 -97.3300 251.000 30.0 117.252 4.270 -999.990 -999.990 1.173 ..P WKT 2010 05 25 15 34 55 31.3200 -97.3300 251.000 122.0 128.626 4.770 -999.990 -999.990 1.286 ..P WKT 2010 05 25 15 39 55 31.3200 -97.3300 251.000 457.0 125.028 4.600 -999.990 -999.990 1.250 ..P WKT 2010 05 25 15 49 55 31.3200 -97.3300 251.000 30.0 128.863 4.060 -999.990 -999.990 1.289 ..P WKT 2010 05 25 15 54 55 31.3200 -97.3300 251.000 122.0 132.831 4.070 -999.990 -999.990 1.328 ..P WKT 2010 05 25 15 59 55 31.3200 -97.3300 251.000 457.0 128.756 3.070 -999.990 -999.990 1.288 ..P WKT 2010 05 25 16 04 55 31.3200 -97.3300 251.000 30.0 126.622 4.080 -999.990 -999.990 1.266 ..P WKT 2010 05 25 16 09 55 31.3200 -97.3300 251.000 122.0 129.482 2.630 -999.990 -999.990 1.295 ..P WKT 2010 05 25 16 14 55 31.3200 -97.3300 251.000 457.0 120.273 2.430 -999.990 -999.990 1.203 ..P WKT 2010 05 25 16 24 55 31.3200 -97.3300 251.000 30.0 121.572 2.290 -999.990 -999.990 1.216 ..P WKT 2010 05 25 16 29 55 31.3200 -97.3300 251.000 122.0 119.319 2.460 -999.990 -999.990 1.193 ..P WKT 2010 05 25 16 34 55 31.3200 -97.3300 251.000 457.0 122.892 3.210 -999.990 -999.990 1.229 ..P WKT 2010 05 25 16 39 55 31.3200 -97.3300 251.000 30.0 120.777 3.690 -999.990 -999.990 1.208 ..P WKT 2010 05 25 16 44 55 31.3200 -97.3300 251.000 122.0 129.069 3.330 -999.990 -999.990 1.291 ..P WKT 2010 05 25 16 49 55 31.3200 -97.3300 251.000 457.0 119.322 2.580 -999.990 -999.990 1.193 ..P WKT 2010 05 25 17 04 55 31.3200 -97.3300 251.000 30.0 119.328 3.510 -999.990 -999.990 1.193 ..P WKT 2010 05 25 17 09 55 31.3200 -97.3300 251.000 122.0 122.194 3.380 -999.990 -999.990 1.222 ..P WKT 2010 05 25 17 14 55 31.3200 -97.3300 251.000 457.0 117.841 3.340 -999.990 -999.990 1.178 ..P WKT 2010 05 25 17 19 55 31.3200 -97.3300 251.000 30.0 115.710 3.300 -999.990 -999.990 1.157 ..P WKT 2010 05 25 17 24 55 31.3200 -97.3300 251.000 122.0 124.407 3.280 -999.990 -999.990 1.244 ..P WKT 2010 05 25 17 29 55 31.3200 -97.3300 251.000 457.0 111.168 2.270 -999.990 -999.990 1.112 ..P WKT 2010 05 25 17 39 55 31.3200 -97.3300 251.000 30.0 118.147 2.720 -999.990 -999.990 1.181 ..P WKT 2010 05 25 17 44 55 31.3200 -97.3300 251.000 122.0 113.371 2.310 -999.990 -999.990 1.134 ..P WKT 2010 05 25 17 49 55 31.3200 -97.3300 251.000 457.0 113.872 2.760 -999.990 -999.990 1.139 ..P WKT 2010 05 25 17 54 55 31.3200 -97.3300 251.000 30.0 112.985 3.010 -999.990 -999.990 1.130 ..P WKT 2010 05 25 17 59 55 31.3200 -97.3300 251.000 122.0 114.319 2.900 -999.990 -999.990 1.143 ..P WKT 2010 05 25 18 04 55 31.3200 -97.3300 251.000 457.0 109.542 3.170 -999.990 -999.990 1.095 ..P WKT 2010 05 25 18 14 55 31.3200 -97.3300 251.000 30.0 109.473 3.470 -999.990 -999.990 1.095 ..P WKT 2010 05 25 18 19 55 31.3200 -97.3300 251.000 122.0 123.073 3.550 -999.990 -999.990 1.231 ..P WKT 2010 05 25 18 24 55 31.3200 -97.3300 251.000 457.0 111.388 3.660 -999.990 -999.990 1.114 ..P WKT 2010 05 25 18 29 55 31.3200 -97.3300 251.000 30.0 114.985 3.100 -999.990 -999.990 1.150 ..P WKT 2010 05 25 18 34 55 31.3200 -97.3300 251.000 122.0 117.472 3.010 -999.990 -999.990 1.175 ..P WKT 2010 05 25 18 39 55 31.3200 -97.3300 251.000 457.0 106.897 2.960 -999.990 -999.990 1.069 ..P WKT 2010 05 25 18 49 55 31.3200 -97.3300 251.000 30.0 118.323 2.500 -999.990 -999.990 1.183 ..P WKT 2010 05 25 18 54 55 31.3200 -97.3300 251.000 122.0 117.812 3.390 -999.990 -999.990 1.178 ..P WKT 2010 05 25 18 59 55 31.3200 -97.3300 251.000 457.0 114.522 4.720 -999.990 -999.990 1.145 ..P WKT 2010 05 25 19 04 55 31.3200 -97.3300 251.000 30.0 108.728 4.590 -999.990 -999.990 1.087 ..P WKT 2010 05 25 19 09 55 31.3200 -97.3300 251.000 122.0 116.280 3.950 -999.990 -999.990 1.163 ..P WKT 2010 05 25 19 14 55 31.3200 -97.3300 251.000 457.0 109.374 2.940 -999.990 -999.990 1.094 ..P WKT 2010 05 25 19 24 55 31.3200 -97.3300 251.000 30.0 114.031 3.510 -999.990 -999.990 1.140 ..P WKT 2010 05 25 19 29 55 31.3200 -97.3300 251.000 122.0 120.314 4.080 -999.990 -999.990 1.203 ..P WKT 2010 05 25 19 34 55 31.3200 -97.3300 251.000 457.0 112.413 5.560 -999.990 -999.990 1.124 ..P WKT 2010 05 25 19 39 55 31.3200 -97.3300 251.000 30.0 121.338 7.120 -999.990 -999.990 1.213 ..P WKT 2010 05 25 19 44 55 31.3200 -97.3300 251.000 122.0 119.278 6.490 -999.990 -999.990 1.193 ..P WKT 2010 05 25 19 49 55 31.3200 -97.3300 251.000 457.0 124.032 4.210 -999.990 -999.990 1.240 ..P WKT 2010 05 25 19 59 55 31.3200 -97.3300 251.000 30.0 123.408 4.250 -999.990 -999.990 1.234 ..P WKT 2010 05 25 20 04 55 31.3200 -97.3300 251.000 122.0 118.863 6.180 -999.990 -999.990 1.189 ..P WKT 2010 05 25 20 09 55 31.3200 -97.3300 251.000 457.0 115.987 7.320 -999.990 -999.990 1.160 ..P WKT 2010 05 25 20 14 55 31.3200 -97.3300 251.000 30.0 117.423 6.490 -999.990 -999.990 1.174 ..P WKT 2010 05 25 20 19 55 31.3200 -97.3300 251.000 122.0 122.060 5.890 -999.990 -999.990 1.221 ..P WKT 2010 05 25 20 24 55 31.3200 -97.3300 251.000 457.0 116.540 4.250 -999.990 -999.990 1.165 ..P WKT 2010 05 25 20 34 55 31.3200 -97.3300 251.000 30.0 111.601 3.840 -999.990 -999.990 1.116 ..P WKT 2010 05 25 20 39 55 31.3200 -97.3300 251.000 122.0 115.522 5.550 -999.990 -999.990 1.155 ..P WKT 2010 05 25 20 44 55 31.3200 -97.3300 251.000 457.0 104.692 5.980 -999.990 -999.990 1.047 ..P WKT 2010 05 25 20 49 55 31.3200 -97.3300 251.000 30.0 117.382 4.870 -999.990 -999.990 1.174 ..P WKT 2010 05 25 20 54 55 31.3200 -97.3300 251.000 122.0 117.964 3.500 -999.990 -999.990 1.180 ..P WKT 2010 05 25 20 59 55 31.3200 -97.3300 251.000 457.0 116.458 4.960 -999.990 -999.990 1.165 ..P WKT 2010 05 25 21 09 55 31.3200 -97.3300 251.000 30.0 114.521 4.660 -999.990 -999.990 1.145 ..P WKT 2010 05 25 21 14 55 31.3200 -97.3300 251.000 122.0 117.290 3.480 -999.990 -999.990 1.173 ..P WKT 2010 05 25 21 19 55 31.3200 -97.3300 251.000 457.0 115.048 3.890 -999.990 -999.990 1.150 ..P WKT 2010 05 25 21 24 55 31.3200 -97.3300 251.000 30.0 113.642 5.170 -999.990 -999.990 1.136 ..P WKT 2010 05 25 21 29 55 31.3200 -97.3300 251.000 122.0 117.247 3.660 -999.990 -999.990 1.172 ..P WKT 2010 05 25 21 34 55 31.3200 -97.3300 251.000 457.0 110.827 3.470 -999.990 -999.990 1.108 ..P WKT 2010 05 25 21 44 55 31.3200 -97.3300 251.000 30.0 115.612 3.720 -999.990 -999.990 1.156 ..P WKT 2010 05 25 21 49 55 31.3200 -97.3300 251.000 122.0 122.363 4.190 -999.990 -999.990 1.224 ..P WKT 2010 05 25 21 54 55 31.3200 -97.3300 251.000 457.0 121.871 3.980 -999.990 -999.990 1.219 ..P WKT 2010 05 25 21 59 55 31.3200 -97.3300 251.000 30.0 122.772 4.400 -999.990 -999.990 1.228 ..P WKT 2010 05 25 22 04 55 31.3200 -97.3300 251.000 122.0 122.838 3.650 -999.990 -999.990 1.228 ..P WKT 2010 05 25 22 09 55 31.3200 -97.3300 251.000 457.0 119.560 3.420 -999.990 -999.990 1.196 ..P WKT 2010 05 25 22 19 55 31.3200 -97.3300 251.000 30.0 123.990 3.620 -999.990 -999.990 1.240 ..P WKT 2010 05 25 22 24 55 31.3200 -97.3300 251.000 122.0 130.027 4.560 -999.990 -999.990 1.300 ..P WKT 2010 05 25 22 29 55 31.3200 -97.3300 251.000 457.0 121.852 3.620 -999.990 -999.990 1.219 ..P WKT 2010 05 25 22 34 55 31.3200 -97.3300 251.000 30.0 121.201 3.780 -999.990 -999.990 1.212 ..P WKT 2010 05 25 22 39 55 31.3200 -97.3300 251.000 122.0 126.402 3.570 -999.990 -999.990 1.264 ..P WKT 2010 05 25 22 44 55 31.3200 -97.3300 251.000 457.0 119.063 3.610 -999.990 -999.990 1.191 ..P WKT 2010 05 25 22 54 55 31.3200 -97.3300 251.000 30.0 121.224 4.560 -999.990 -999.990 1.212 ..P WKT 2010 05 25 22 59 55 31.3200 -97.3300 251.000 122.0 115.396 3.770 -999.990 -999.990 1.154 ..P WKT 2010 05 25 23 04 55 31.3200 -97.3300 251.000 457.0 117.930 7.270 -999.990 -999.990 1.179 ..P WKT 2010 05 25 23 09 55 31.3200 -97.3300 251.000 30.0 116.980 6.040 -999.990 -999.990 1.170 ..P WKT 2010 05 25 23 14 55 31.3200 -97.3300 251.000 122.0 118.539 5.570 -999.990 -999.990 1.185 ..P WKT 2010 05 25 23 19 55 31.3200 -97.3300 251.000 457.0 112.290 4.030 -999.990 -999.990 1.123 ..P WKT 2010 05 25 23 29 55 31.3200 -97.3300 251.000 30.0 112.510 4.070 -999.990 -999.990 1.125 ..P WKT 2010 05 25 23 34 55 31.3200 -97.3300 251.000 122.0 119.677 5.340 -999.990 -999.990 1.197 ..P WKT 2010 05 25 23 39 55 31.3200 -97.3300 251.000 457.0 121.545 6.020 -999.990 -999.990 1.215 ..P WKT 2010 05 25 23 44 55 31.3200 -97.3300 251.000 30.0 112.954 6.310 -999.990 -999.990 1.130 ..P WKT 2010 05 25 23 49 55 31.3200 -97.3300 251.000 122.0 119.007 4.700 -999.990 -999.990 1.190 ..P WKT 2010 05 26 00 09 55 31.3200 -97.3300 251.000 457.0 119.827 3.590 -999.990 -999.990 1.198 ..P WKT 2010 05 26 00 10 25 31.3200 -97.3300 251.000 457.0 121.505 3.370 -999.990 -999.990 1.215 ..P WKT 2010 05 26 00 10 55 31.3200 -97.3300 251.000 457.0 119.138 3.920 -999.990 -999.990 1.191 ..P WKT 2010 05 26 00 11 25 31.3200 -97.3300 251.000 457.0 119.003 3.800 -999.990 -999.990 1.190 ..P WKT 2010 05 26 00 11 55 31.3200 -97.3300 251.000 457.0 118.589 3.910 -999.990 -999.990 1.186 ..P WKT 2010 05 26 00 12 25 31.3200 -97.3300 251.000 457.0 122.079 3.470 -999.990 -999.990 1.221 ..P WKT 2010 05 26 00 12 55 31.3200 -97.3300 251.000 457.0 121.944 3.540 -999.990 -999.990 1.219 ..P WKT 2010 05 26 00 13 25 31.3200 -97.3300 251.000 457.0 124.597 4.030 -999.990 -999.990 1.246 ..P WKT 2010 05 26 00 13 55 31.3200 -97.3300 251.000 457.0 119.442 3.390 -999.990 -999.990 1.194 ..P WKT 2010 05 26 00 14 25 31.3200 -97.3300 251.000 457.0 124.188 3.860 -999.990 -999.990 1.242 ..P WKT 2010 05 26 00 14 55 31.3200 -97.3300 251.000 457.0 123.076 4.140 -999.990 -999.990 1.231 ..P WKT 2010 05 26 00 19 55 31.3200 -97.3300 251.000 30.0 121.305 4.060 -999.990 -999.990 1.213 ..P WKT 2010 05 26 00 24 55 31.3200 -97.3300 251.000 122.0 121.485 4.130 -999.990 -999.990 1.215 ..P WKT 2010 05 26 00 29 55 31.3200 -97.3300 251.000 457.0 117.484 4.310 -999.990 -999.990 1.175 ..P WKT 2010 05 26 00 34 55 31.3200 -97.3300 251.000 30.0 116.410 5.780 -999.990 -999.990 1.164 ..P WKT 2010 05 26 00 39 55 31.3200 -97.3300 251.000 122.0 115.754 3.730 -999.990 -999.990 1.158 ..P WKT 2010 05 26 00 44 55 31.3200 -97.3300 251.000 457.0 117.051 4.310 -999.990 -999.990 1.171 ..P WKT 2010 05 26 00 54 55 31.3200 -97.3300 251.000 30.0 115.152 4.390 -999.990 -999.990 1.152 ..P WKT 2010 05 26 00 59 55 31.3200 -97.3300 251.000 122.0 113.072 3.840 -999.990 -999.990 1.131 ..P WKT 2010 05 26 01 04 55 31.3200 -97.3300 251.000 457.0 111.411 4.320 -999.990 -999.990 1.114 ..P WKT 2010 05 26 01 09 55 31.3200 -97.3300 251.000 30.0 121.455 3.830 -999.990 -999.990 1.215 ..P WKT 2010 05 26 01 14 55 31.3200 -97.3300 251.000 122.0 129.269 4.140 -999.990 -999.990 1.293 ..P WKT 2010 05 26 01 19 55 31.3200 -97.3300 251.000 457.0 119.247 3.890 -999.990 -999.990 1.192 ..P WKT 2010 05 26 01 29 55 31.3200 -97.3300 251.000 30.0 126.234 4.280 -999.990 -999.990 1.262 ..P WKT 2010 05 26 01 34 55 31.3200 -97.3300 251.000 122.0 132.652 4.110 -999.990 -999.990 1.327 ..P WKT 2010 05 26 01 39 55 31.3200 -97.3300 251.000 457.0 122.632 7.360 -999.990 -999.990 1.226 ..P WKT 2010 05 26 01 44 55 31.3200 -97.3300 251.000 30.0 130.443 3.510 -999.990 -999.990 1.304 ..P WKT 2010 05 26 01 49 55 31.3200 -97.3300 251.000 122.0 132.124 3.560 -999.990 -999.990 1.321 ..P WKT 2010 05 26 01 54 55 31.3200 -97.3300 251.000 457.0 121.549 3.930 -999.990 -999.990 1.215 ..P WKT 2010 05 26 02 04 55 31.3200 -97.3300 251.000 30.0 140.748 3.860 -999.990 -999.990 1.407 ..P WKT 2010 05 26 02 09 55 31.3200 -97.3300 251.000 122.0 148.236 3.550 -999.990 -999.990 1.482 ..P WKT 2010 05 26 02 14 55 31.3200 -97.3300 251.000 457.0 118.965 3.730 -999.990 -999.990 1.190 ..P WKT 2010 05 26 02 19 55 31.3200 -97.3300 251.000 30.0 149.845 3.910 -999.990 -999.990 1.498 ..P WKT 2010 05 26 02 24 55 31.3200 -97.3300 251.000 122.0 126.704 5.390 -999.990 -999.990 1.267 ..P WKT 2010 05 26 02 29 55 31.3200 -97.3300 251.000 457.0 118.600 3.730 -999.990 -999.990 1.186 ..P WKT 2010 05 26 02 39 55 31.3200 -97.3300 251.000 30.0 139.122 3.060 -999.990 -999.990 1.391 ..P WKT 2010 05 26 02 44 55 31.3200 -97.3300 251.000 122.0 123.204 2.960 -999.990 -999.990 1.232 ..P WKT 2010 05 26 02 49 55 31.3200 -97.3300 251.000 457.0 108.124 3.640 -999.990 -999.990 1.081 ..P WKT 2010 05 26 02 54 55 31.3200 -97.3300 251.000 30.0 120.601 3.650 -999.990 -999.990 1.206 ..P WKT 2010 05 26 02 59 55 31.3200 -97.3300 251.000 122.0 115.264 3.180 -999.990 -999.990 1.153 ..P WKT 2010 05 26 03 04 55 31.3200 -97.3300 251.000 457.0 105.475 2.770 -999.990 -999.990 1.055 ..P WKT 2010 05 26 03 14 55 31.3200 -97.3300 251.000 30.0 118.655 3.060 -999.990 -999.990 1.187 ..P WKT 2010 05 26 03 19 55 31.3200 -97.3300 251.000 122.0 120.753 3.100 -999.990 -999.990 1.208 ..P WKT 2010 05 26 03 24 55 31.3200 -97.3300 251.000 457.0 107.408 2.670 -999.990 -999.990 1.074 ..P WKT 2010 05 26 03 29 55 31.3200 -97.3300 251.000 30.0 115.627 4.420 -999.990 -999.990 1.156 ..P WKT 2010 05 26 03 34 55 31.3200 -97.3300 251.000 122.0 114.108 2.930 -999.990 -999.990 1.141 ..P WKT 2010 05 26 03 39 55 31.3200 -97.3300 251.000 457.0 103.827 3.510 -999.990 -999.990 1.038 ..P WKT 2010 05 26 03 49 55 31.3200 -97.3300 251.000 30.0 120.379 3.360 -999.990 -999.990 1.204 ..P WKT 2010 05 26 03 54 55 31.3200 -97.3300 251.000 122.0 114.391 2.920 -999.990 -999.990 1.144 ..P WKT 2010 05 26 03 59 55 31.3200 -97.3300 251.000 457.0 108.402 3.660 -999.990 -999.990 1.084 ..P WKT 2010 05 26 04 04 55 31.3200 -97.3300 251.000 30.0 115.206 3.610 -999.990 -999.990 1.152 ..P WKT 2010 05 26 04 09 55 31.3200 -97.3300 251.000 122.0 119.507 3.280 -999.990 -999.990 1.195 ..P WKT 2010 05 26 04 14 55 31.3200 -97.3300 251.000 457.0 113.103 3.060 -999.990 -999.990 1.131 ..P WKT 2010 05 26 04 24 55 31.3200 -97.3300 251.000 30.0 112.847 3.560 -999.990 -999.990 1.128 ..P WKT 2010 05 26 04 29 55 31.3200 -97.3300 251.000 122.0 112.322 3.150 -999.990 -999.990 1.123 ..P WKT 2010 05 26 04 34 55 31.3200 -97.3300 251.000 457.0 106.376 2.940 -999.990 -999.990 1.064 ..P WKT 2010 05 26 04 39 55 31.3200 -97.3300 251.000 30.0 105.157 3.320 -999.990 -999.990 1.052 ..P WKT 2010 05 26 04 44 55 31.3200 -97.3300 251.000 122.0 110.469 2.350 -999.990 -999.990 1.105 ..P WKT 2010 05 26 04 49 55 31.3200 -97.3300 251.000 457.0 109.388 2.370 -999.990 -999.990 1.094 ..P WKT 2010 05 26 05 04 55 31.3200 -97.3300 251.000 30.0 110.762 2.160 -999.990 -999.990 1.108 ..P WKT 2010 05 26 05 09 55 31.3200 -97.3300 251.000 122.0 104.348 2.720 -999.990 -999.990 1.043 ..P WKT 2010 05 26 05 14 55 31.3200 -97.3300 251.000 457.0 104.881 3.430 -999.990 -999.990 1.049 ..P WKT 2010 05 26 05 19 55 31.3200 -97.3300 251.000 30.0 106.247 2.520 -999.990 -999.990 1.062 ..P WKT 2010 05 26 05 24 55 31.3200 -97.3300 251.000 122.0 107.890 3.830 -999.990 -999.990 1.079 ..P WKT 2010 05 26 05 29 55 31.3200 -97.3300 251.000 457.0 106.756 2.770 -999.990 -999.990 1.068 ..P WKT 2010 05 26 05 39 55 31.3200 -97.3300 251.000 30.0 107.259 3.820 -999.990 -999.990 1.073 ..P WKT 2010 05 26 05 44 55 31.3200 -97.3300 251.000 122.0 108.619 3.410 -999.990 -999.990 1.086 ..P WKT 2010 05 26 05 49 55 31.3200 -97.3300 251.000 457.0 106.370 2.730 -999.990 -999.990 1.064 ..P WKT 2010 05 26 05 54 55 31.3200 -97.3300 251.000 30.0 113.839 3.090 -999.990 -999.990 1.138 ..P WKT 2010 05 26 05 59 55 31.3200 -97.3300 251.000 122.0 107.979 3.890 -999.990 -999.990 1.080 ..P WKT 2010 05 26 06 04 55 31.3200 -97.3300 251.000 457.0 104.896 3.210 -999.990 -999.990 1.049 ..P WKT 2010 05 26 06 14 55 31.3200 -97.3300 251.000 30.0 113.406 3.240 -999.990 -999.990 1.134 ..P WKT 2010 05 26 06 19 55 31.3200 -97.3300 251.000 122.0 113.893 3.250 -999.990 -999.990 1.139 ..P WKT 2010 05 26 06 24 55 31.3200 -97.3300 251.000 457.0 109.106 2.600 -999.990 -999.990 1.091 ..P WKT 2010 05 26 06 29 55 31.3200 -97.3300 251.000 30.0 120.141 4.180 -999.990 -999.990 1.201 ..P WKT 2010 05 26 06 34 55 31.3200 -97.3300 251.000 122.0 110.081 2.290 -999.990 -999.990 1.101 ..P WKT 2010 05 26 06 39 55 31.3200 -97.3300 251.000 457.0 109.458 4.300 -999.990 -999.990 1.095 ..P WKT 2010 05 26 06 49 55 31.3200 -97.3300 251.000 30.0 112.076 2.130 -999.990 -999.990 1.121 ..P WKT 2010 05 26 06 54 55 31.3200 -97.3300 251.000 122.0 106.439 2.550 -999.990 -999.990 1.064 ..P WKT 2010 05 26 06 59 55 31.3200 -97.3300 251.000 457.0 110.235 3.410 -999.990 -999.990 1.102 ..P WKT 2010 05 26 07 04 55 31.3200 -97.3300 251.000 30.0 117.083 3.190 -999.990 -999.990 1.171 ..P WKT 2010 05 26 07 09 55 31.3200 -97.3300 251.000 122.0 108.673 2.700 -999.990 -999.990 1.087 ..P WKT 2010 05 26 07 14 55 31.3200 -97.3300 251.000 457.0 106.089 3.410 -999.990 -999.990 1.061 ..P WKT 2010 05 26 07 24 55 31.3200 -97.3300 251.000 30.0 117.641 3.180 -999.990 -999.990 1.176 ..P WKT 2010 05 26 07 29 55 31.3200 -97.3300 251.000 122.0 106.400 3.020 -999.990 -999.990 1.064 ..P WKT 2010 05 26 07 34 55 31.3200 -97.3300 251.000 457.0 110.413 4.420 -999.990 -999.990 1.104 ..P WKT 2010 05 26 07 39 55 31.3200 -97.3300 251.000 30.0 114.148 3.530 -999.990 -999.990 1.141 ..P WKT 2010 05 26 07 44 55 31.3200 -97.3300 251.000 122.0 98.472 4.250 -999.990 -999.990 0.985 ..P WKT 2010 05 26 07 49 55 31.3200 -97.3300 251.000 457.0 102.346 4.530 -999.990 -999.990 1.023 ..P WKT 2010 05 26 07 59 55 31.3200 -97.3300 251.000 30.0 112.469 3.480 -999.990 -999.990 1.125 ..P WKT 2010 05 26 08 04 55 31.3200 -97.3300 251.000 122.0 108.599 3.270 -999.990 -999.990 1.086 ..P WKT 2010 05 26 08 09 55 31.3200 -97.3300 251.000 457.0 107.224 4.030 -999.990 -999.990 1.072 ..P WKT 2010 05 26 08 14 55 31.3200 -97.3300 251.000 30.0 110.285 4.750 -999.990 -999.990 1.103 ..P WKT 2010 05 26 08 19 55 31.3200 -97.3300 251.000 122.0 102.813 3.570 -999.990 -999.990 1.028 ..P WKT 2010 05 26 08 24 55 31.3200 -97.3300 251.000 457.0 93.956 2.970 -999.990 -999.990 0.940 ..P WKT 2010 05 26 08 34 55 31.3200 -97.3300 251.000 30.0 108.133 3.260 -999.990 -999.990 1.081 ..P WKT 2010 05 26 08 39 55 31.3200 -97.3300 251.000 122.0 104.285 3.520 -999.990 -999.990 1.043 ..P WKT 2010 05 26 08 44 55 31.3200 -97.3300 251.000 457.0 99.884 3.200 -999.990 -999.990 0.999 ..P WKT 2010 05 26 08 49 55 31.3200 -97.3300 251.000 30.0 108.780 4.060 -999.990 -999.990 1.088 ..P WKT 2010 05 26 08 54 55 31.3200 -97.3300 251.000 122.0 101.886 3.410 -999.990 -999.990 1.019 ..P WKT 2010 05 26 08 59 55 31.3200 -97.3300 251.000 457.0 100.810 2.150 -999.990 -999.990 1.008 ..P WKT 2010 05 26 09 09 55 31.3200 -97.3300 251.000 30.0 106.590 2.470 -999.990 -999.990 1.066 ..P WKT 2010 05 26 09 14 55 31.3200 -97.3300 251.000 122.0 100.430 3.750 -999.990 -999.990 1.004 ..P WKT 2010 05 26 09 19 55 31.3200 -97.3300 251.000 457.0 105.901 3.490 -999.990 -999.990 1.059 ..P WKT 2010 05 26 09 24 55 31.3200 -97.3300 251.000 30.0 102.510 3.300 -999.990 -999.990 1.025 ..P WKT 2010 05 26 09 29 55 31.3200 -97.3300 251.000 122.0 106.597 3.540 -999.990 -999.990 1.066 ..P WKT 2010 05 26 09 34 55 31.3200 -97.3300 251.000 457.0 112.067 4.590 -999.990 -999.990 1.121 ..P WKT 2010 05 26 09 44 55 31.3200 -97.3300 251.000 30.0 113.038 4.090 -999.990 -999.990 1.130 ..P WKT 2010 05 26 09 49 55 31.3200 -97.3300 251.000 122.0 101.897 3.070 -999.990 -999.990 1.019 ..P WKT 2010 05 26 09 54 55 31.3200 -97.3300 251.000 457.0 111.518 3.570 -999.990 -999.990 1.115 ..P WKT 2010 05 26 09 59 55 31.3200 -97.3300 251.000 30.0 116.709 2.720 -999.990 -999.990 1.167 ..P WKT 2010 05 26 10 04 55 31.3200 -97.3300 251.000 122.0 107.230 2.090 -999.990 -999.990 1.072 ..P WKT 2010 05 26 10 09 55 31.3200 -97.3300 251.000 457.0 103.565 2.140 -999.990 -999.990 1.036 ..P WKT 2010 05 26 10 19 55 31.3200 -97.3300 251.000 30.0 111.534 3.390 -999.990 -999.990 1.115 ..P WKT 2010 05 26 10 24 55 31.3200 -97.3300 251.000 122.0 116.526 2.270 -999.990 -999.990 1.165 ..P WKT 2010 05 26 10 29 55 31.3200 -97.3300 251.000 457.0 109.343 4.110 -999.990 -999.990 1.093 ..P WKT 2010 05 26 10 34 55 31.3200 -97.3300 251.000 30.0 113.227 3.300 -999.990 -999.990 1.132 ..P WKT 2010 05 26 10 39 55 31.3200 -97.3300 251.000 122.0 108.535 2.820 -999.990 -999.990 1.085 ..P WKT 2010 05 26 10 44 55 31.3200 -97.3300 251.000 457.0 112.419 3.210 -999.990 -999.990 1.124 ..P WKT 2010 05 26 10 54 55 31.3200 -97.3300 251.000 30.0 118.566 3.760 -999.990 -999.990 1.186 ..P WKT 2010 05 26 10 59 55 31.3200 -97.3300 251.000 122.0 116.957 4.530 -999.990 -999.990 1.170 ..P WKT 2010 05 26 11 04 55 31.3200 -97.3300 251.000 457.0 105.807 3.820 -999.990 -999.990 1.058 ..P WKT 2010 05 26 11 09 55 31.3200 -97.3300 251.000 30.0 118.993 3.100 -999.990 -999.990 1.190 ..P WKT 2010 05 26 11 14 55 31.3200 -97.3300 251.000 122.0 106.600 2.190 -999.990 -999.990 1.066 ..P WKT 2010 05 26 11 19 55 31.3200 -97.3300 251.000 457.0 100.292 3.380 -999.990 -999.990 1.003 ..P WKT 2010 05 26 11 29 55 31.3200 -97.3300 251.000 30.0 118.394 2.380 -999.990 -999.990 1.184 ..P WKT 2010 05 26 11 34 55 31.3200 -97.3300 251.000 122.0 107.140 2.090 -999.990 -999.990 1.071 ..P WKT 2010 05 26 11 39 55 31.3200 -97.3300 251.000 457.0 101.139 2.090 -999.990 -999.990 1.011 ..P WKT 2010 05 26 11 44 55 31.3200 -97.3300 251.000 30.0 114.349 2.730 -999.990 -999.990 1.143 ..P WKT 2010 05 26 11 49 55 31.3200 -97.3300 251.000 122.0 100.334 2.850 -999.990 -999.990 1.003 ..P WKT 2010 05 26 12 09 55 31.3200 -97.3300 251.000 457.0 98.566 1.790 -999.990 -999.990 0.986 ..P WKT 2010 05 26 12 10 25 31.3200 -97.3300 251.000 457.0 95.409 2.840 -999.990 -999.990 0.954 ..P WKT 2010 05 26 12 10 55 31.3200 -97.3300 251.000 457.0 99.300 3.210 -999.990 -999.990 0.993 ..P WKT 2010 05 26 12 11 25 31.3200 -97.3300 251.000 457.0 98.215 2.230 -999.990 -999.990 0.982 ..P WKT 2010 05 26 12 11 55 31.3200 -97.3300 251.000 457.0 98.374 2.440 -999.990 -999.990 0.984 ..P WKT 2010 05 26 12 12 25 31.3200 -97.3300 251.000 457.0 102.127 1.720 -999.990 -999.990 1.021 ..P WKT 2010 05 26 12 12 55 31.3200 -97.3300 251.000 457.0 103.945 2.610 -999.990 -999.990 1.039 ..P WKT 2010 05 26 12 13 25 31.3200 -97.3300 251.000 457.0 101.340 3.040 -999.990 -999.990 1.013 ..P WKT 2010 05 26 12 13 55 31.3200 -97.3300 251.000 457.0 99.564 2.530 -999.990 -999.990 0.996 ..P WKT 2010 05 26 12 14 25 31.3200 -97.3300 251.000 457.0 97.097 2.370 -999.990 -999.990 0.971 ..P WKT 2010 05 26 12 14 55 31.3200 -97.3300 251.000 457.0 100.574 3.880 -999.990 -999.990 1.006 ..P WKT 2010 05 26 12 19 55 31.3200 -97.3300 251.000 30.0 102.305 3.780 -999.990 -999.990 1.023 ..P WKT 2010 05 26 12 24 55 31.3200 -97.3300 251.000 122.0 100.443 2.680 -999.990 -999.990 1.004 ..P WKT 2010 05 26 12 29 55 31.3200 -97.3300 251.000 457.0 104.110 2.570 -999.990 -999.990 1.041 ..P WKT 2010 05 26 12 34 55 31.3200 -97.3300 251.000 30.0 106.535 2.560 -999.990 -999.990 1.065 ..P WKT 2010 05 26 12 39 55 31.3200 -97.3300 251.000 122.0 96.651 1.470 -999.990 -999.990 0.967 ..P WKT 2010 05 26 12 44 55 31.3200 -97.3300 251.000 457.0 103.639 2.250 -999.990 -999.990 1.036 ..P WKT 2010 05 26 12 54 55 31.3200 -97.3300 251.000 30.0 104.019 2.340 -999.990 -999.990 1.040 ..P WKT 2010 05 26 12 59 55 31.3200 -97.3300 251.000 122.0 100.315 2.600 -999.990 -999.990 1.003 ..P WKT 2010 05 26 13 04 55 31.3200 -97.3300 251.000 457.0 99.931 2.420 -999.990 -999.990 0.999 ..P WKT 2010 05 26 13 09 55 31.3200 -97.3300 251.000 30.0 104.806 2.260 -999.990 -999.990 1.048 ..P WKT 2010 05 26 13 14 55 31.3200 -97.3300 251.000 122.0 99.163 2.890 -999.990 -999.990 0.992 ..P WKT 2010 05 26 13 19 55 31.3200 -97.3300 251.000 457.0 101.823 3.270 -999.990 -999.990 1.018 ..P WKT 2010 05 26 13 29 55 31.3200 -97.3300 251.000 30.0 108.886 3.890 -999.990 -999.990 1.089 ..P WKT 2010 05 26 13 34 55 31.3200 -97.3300 251.000 122.0 107.475 2.810 -999.990 -999.990 1.075 ..P WKT 2010 05 26 13 39 55 31.3200 -97.3300 251.000 457.0 110.217 4.580 -999.990 -999.990 1.102 ..P WKT 2010 05 26 13 44 55 31.3200 -97.3300 251.000 30.0 102.988 4.880 -999.990 -999.990 1.030 ..P WKT 2010 05 26 13 49 55 31.3200 -97.3300 251.000 122.0 107.947 4.170 -999.990 -999.990 1.079 ..P WKT 2010 05 26 13 54 55 31.3200 -97.3300 251.000 457.0 107.919 2.610 -999.990 -999.990 1.079 ..P WKT 2010 05 26 14 04 55 31.3200 -97.3300 251.000 30.0 102.085 3.810 -999.990 -999.990 1.021 ..P WKT 2010 05 26 14 09 55 31.3200 -97.3300 251.000 122.0 107.362 3.620 -999.990 -999.990 1.074 ..P WKT 2010 05 26 14 14 55 31.3200 -97.3300 251.000 457.0 107.374 4.060 -999.990 -999.990 1.074 ..P WKT 2010 05 26 14 19 55 31.3200 -97.3300 251.000 30.0 104.059 3.830 -999.990 -999.990 1.041 ..P WKT 2010 05 26 14 24 55 31.3200 -97.3300 251.000 122.0 114.605 3.920 -999.990 -999.990 1.146 ..P WKT 2010 05 26 14 29 55 31.3200 -97.3300 251.000 457.0 109.073 2.560 -999.990 -999.990 1.091 ..P WKT 2010 05 26 14 39 55 31.3200 -97.3300 251.000 30.0 111.414 2.380 -999.990 -999.990 1.114 ..P WKT 2010 05 26 14 44 55 31.3200 -97.3300 251.000 122.0 116.240 4.040 -999.990 -999.990 1.162 ..P WKT 2010 05 26 14 49 55 31.3200 -97.3300 251.000 457.0 106.645 4.560 -999.990 -999.990 1.066 ..P WKT 2010 05 26 14 54 55 31.3200 -97.3300 251.000 30.0 102.042 3.070 -999.990 -999.990 1.020 ..P WKT 2010 05 26 14 59 55 31.3200 -97.3300 251.000 122.0 107.006 4.720 -999.990 -999.990 1.070 ..P WKT 2010 05 26 15 04 55 31.3200 -97.3300 251.000 457.0 104.898 3.090 -999.990 -999.990 1.049 ..P WKT 2010 05 26 15 14 55 31.3200 -97.3300 251.000 30.0 105.536 3.010 -999.990 -999.990 1.055 ..P WKT 2010 05 26 15 19 55 31.3200 -97.3300 251.000 122.0 111.197 4.730 -999.990 -999.990 1.112 ..P WKT 2010 05 26 15 24 55 31.3200 -97.3300 251.000 457.0 105.897 5.710 -999.990 -999.990 1.059 ..P WKT 2010 05 26 15 29 55 31.3200 -97.3300 251.000 30.0 110.310 3.100 -999.990 -999.990 1.103 ..P WKT 2010 05 26 15 34 55 31.3200 -97.3300 251.000 122.0 119.305 3.740 -999.990 -999.990 1.193 ..P WKT 2010 05 26 15 39 55 31.3200 -97.3300 251.000 457.0 112.337 2.900 -999.990 -999.990 1.123 ..P WKT 2010 05 26 15 49 55 31.3200 -97.3300 251.000 30.0 123.787 3.000 -999.990 -999.990 1.238 ..P WKT 2010 05 26 15 54 55 31.3200 -97.3300 251.000 122.0 132.628 3.030 -999.990 -999.990 1.326 ..P WKT 2010 05 26 15 59 55 31.3200 -97.3300 251.000 457.0 125.917 2.680 -999.990 -999.990 1.259 ..P WKT 2010 05 26 16 04 55 31.3200 -97.3300 251.000 30.0 137.260 3.480 -999.990 -999.990 1.373 ..P WKT 2010 05 26 16 09 55 31.3200 -97.3300 251.000 122.0 141.244 4.250 -999.990 -999.990 1.412 ..P WKT 2010 05 26 16 14 55 31.3200 -97.3300 251.000 457.0 127.447 2.810 -999.990 -999.990 1.274 ..P WKT 2010 05 26 16 24 55 31.3200 -97.3300 251.000 30.0 140.437 1.980 -999.990 -999.990 1.404 ..P WKT 2010 05 26 16 29 55 31.3200 -97.3300 251.000 122.0 130.130 4.680 -999.990 -999.990 1.301 ..P WKT 2010 05 26 16 34 55 31.3200 -97.3300 251.000 457.0 118.709 3.200 -999.990 -999.990 1.187 ..P WKT 2010 05 26 16 39 55 31.3200 -97.3300 251.000 30.0 117.988 3.080 -999.990 -999.990 1.180 ..P WKT 2010 05 26 16 44 55 31.3200 -97.3300 251.000 122.0 128.665 2.910 -999.990 -999.990 1.287 ..P WKT 2010 05 26 16 49 55 31.3200 -97.3300 251.000 457.0 119.464 2.950 -999.990 -999.990 1.195 ..P WKT 2010 05 26 17 04 55 31.3200 -97.3300 251.000 30.0 113.693 2.080 -999.990 -999.990 1.137 ..P WKT 2010 05 26 17 09 55 31.3200 -97.3300 251.000 122.0 120.139 4.650 -999.990 -999.990 1.201 ..P WKT 2010 05 26 17 14 55 31.3200 -97.3300 251.000 457.0 117.405 5.700 -999.990 -999.990 1.174 ..P WKT 2010 05 26 17 19 55 31.3200 -97.3300 251.000 30.0 111.611 5.450 -999.990 -999.990 1.116 ..P WKT 2010 05 26 17 24 55 31.3200 -97.3300 251.000 122.0 125.569 4.580 -999.990 -999.990 1.256 ..P WKT 2010 05 26 17 29 55 31.3200 -97.3300 251.000 457.0 110.592 2.790 -999.990 -999.990 1.106 ..P WKT 2010 05 26 17 39 55 31.3200 -97.3300 251.000 30.0 114.946 2.990 -999.990 -999.990 1.149 ..P WKT 2010 05 26 17 44 55 31.3200 -97.3300 251.000 122.0 114.800 4.950 -999.990 -999.990 1.148 ..P WKT 2010 05 26 17 49 55 31.3200 -97.3300 251.000 457.0 109.921 6.740 -999.990 -999.990 1.099 ..P WKT 2010 05 26 17 54 55 31.3200 -97.3300 251.000 30.0 118.405 4.600 -999.990 -999.990 1.184 ..P WKT 2010 05 26 17 59 55 31.3200 -97.3300 251.000 122.0 119.094 4.450 -999.990 -999.990 1.191 ..P WKT 2010 05 26 18 04 55 31.3200 -97.3300 251.000 457.0 121.734 1.670 -999.990 -999.990 1.217 ..P WKT 2010 05 26 18 14 55 31.3200 -97.3300 251.000 30.0 120.110 1.860 -999.990 -999.990 1.201 ..P WKT 2010 05 26 18 19 55 31.3200 -97.3300 251.000 122.0 123.366 2.430 -999.990 -999.990 1.234 ..P WKT 2010 05 26 18 24 55 31.3200 -97.3300 251.000 457.0 121.330 3.150 -999.990 -999.990 1.213 ..P WKT 2010 05 26 18 29 55 31.3200 -97.3300 251.000 30.0 119.572 3.060 -999.990 -999.990 1.196 ..P WKT 2010 05 26 18 34 55 31.3200 -97.3300 251.000 122.0 129.796 3.120 -999.990 -999.990 1.298 ..P WKT 2010 05 26 18 39 55 31.3200 -97.3300 251.000 457.0 118.285 2.560 -999.990 -999.990 1.183 ..P WKT 2010 05 26 18 49 55 31.3200 -97.3300 251.000 30.0 122.473 2.610 -999.990 -999.990 1.225 ..P WKT 2010 05 26 18 54 55 31.3200 -97.3300 251.000 122.0 125.633 2.820 -999.990 -999.990 1.256 ..P WKT 2010 05 26 18 59 55 31.3200 -97.3300 251.000 457.0 116.666 3.370 -999.990 -999.990 1.167 ..P WKT 2010 05 26 19 04 55 31.3200 -97.3300 251.000 30.0 123.450 2.800 -999.990 -999.990 1.235 ..P WKT 2010 05 26 19 09 55 31.3200 -97.3300 251.000 122.0 126.611 2.510 -999.990 -999.990 1.266 ..P WKT 2010 05 26 19 14 55 31.3200 -97.3300 251.000 457.0 121.127 2.820 -999.990 -999.990 1.211 ..P WKT 2010 05 26 19 24 55 31.3200 -97.3300 251.000 30.0 125.617 2.310 -999.990 -999.990 1.256 ..P WKT 2010 05 26 19 29 55 31.3200 -97.3300 251.000 122.0 128.342 2.250 -999.990 -999.990 1.283 ..P WKT 2010 05 26 19 34 55 31.3200 -97.3300 251.000 457.0 120.465 2.210 -999.990 -999.990 1.205 ..P WKT 2010 05 26 19 39 55 31.3200 -97.3300 251.000 30.0 123.606 2.140 -999.990 -999.990 1.236 ..P WKT 2010 05 26 19 44 55 31.3200 -97.3300 251.000 122.0 127.866 1.750 -999.990 -999.990 1.279 ..P WKT 2010 05 26 19 49 55 31.3200 -97.3300 251.000 457.0 125.010 1.680 -999.990 -999.990 1.250 ..P WKT 2010 05 26 19 59 55 31.3200 -97.3300 251.000 30.0 132.036 1.570 -999.990 -999.990 1.320 ..P WKT 2010 05 26 20 04 55 31.3200 -97.3300 251.000 122.0 140.804 3.510 -999.990 -999.990 1.408 ..P WKT 2010 05 26 20 09 55 31.3200 -97.3300 251.000 457.0 133.661 2.270 -999.990 -999.990 1.337 ..P WKT 2010 05 26 20 14 55 31.3200 -97.3300 251.000 30.0 141.873 4.280 -999.990 -999.990 1.419 ..P WKT 2010 05 26 20 19 55 31.3200 -97.3300 251.000 122.0 144.501 2.810 -999.990 -999.990 1.445 ..P WKT 2010 05 26 20 24 55 31.3200 -97.3300 251.000 457.0 132.189 1.920 -999.990 -999.990 1.322 ..P WKT 2010 05 26 20 34 55 31.3200 -97.3300 251.000 30.0 128.009 3.480 -999.990 -999.990 1.280 ..P WKT 2010 05 26 20 39 55 31.3200 -97.3300 251.000 122.0 134.748 2.260 -999.990 -999.990 1.347 ..P WKT 2010 05 26 20 44 55 31.3200 -97.3300 251.000 457.0 125.004 3.470 -999.990 -999.990 1.250 ..P WKT 2010 05 26 20 49 55 31.3200 -97.3300 251.000 30.0 126.155 5.290 -999.990 -999.990 1.262 ..P WKT 2010 05 26 20 54 55 31.3200 -97.3300 251.000 122.0 132.897 2.400 -999.990 -999.990 1.329 ..P WKT 2010 05 26 20 59 55 31.3200 -97.3300 251.000 457.0 131.813 2.870 -999.990 -999.990 1.318 ..P WKT 2010 05 26 21 09 55 31.3200 -97.3300 251.000 30.0 132.581 2.080 -999.990 -999.990 1.326 ..P WKT 2010 05 26 21 14 55 31.3200 -97.3300 251.000 122.0 134.713 1.980 -999.990 -999.990 1.347 ..P WKT 2010 05 26 21 19 55 31.3200 -97.3300 251.000 457.0 136.286 3.550 -999.990 -999.990 1.363 ..P WKT 2010 05 26 21 24 55 31.3200 -97.3300 251.000 30.0 133.105 4.440 -999.990 -999.990 1.331 ..P WKT 2010 05 26 21 29 55 31.3200 -97.3300 251.000 122.0 132.440 4.040 -999.990 -999.990 1.324 ..P WKT 2010 05 26 21 34 55 31.3200 -97.3300 251.000 457.0 135.692 2.380 -999.990 -999.990 1.357 ..P WKT 2010 05 26 21 44 55 31.3200 -97.3300 251.000 30.0 147.792 3.130 -999.990 -999.990 1.478 ..P WKT 2010 05 26 21 49 55 31.3200 -97.3300 251.000 122.0 146.009 3.660 -999.990 -999.990 1.460 ..P WKT 2010 05 26 21 54 55 31.3200 -97.3300 251.000 457.0 147.585 4.160 -999.990 -999.990 1.476 ..P WKT 2010 05 26 21 59 55 31.3200 -97.3300 251.000 30.0 138.247 4.610 -999.990 -999.990 1.382 ..P WKT 2010 05 26 22 04 55 31.3200 -97.3300 251.000 122.0 144.859 4.380 -999.990 -999.990 1.449 ..P WKT 2010 05 26 22 09 55 31.3200 -97.3300 251.000 457.0 136.918 3.380 -999.990 -999.990 1.369 ..P WKT 2010 05 26 22 19 55 31.3200 -97.3300 251.000 30.0 138.089 4.660 -999.990 -999.990 1.381 ..P WKT 2010 05 26 22 24 55 31.3200 -97.3300 251.000 122.0 140.204 4.350 -999.990 -999.990 1.402 ..P WKT 2010 05 26 22 29 55 31.3200 -97.3300 251.000 457.0 135.599 5.320 -999.990 -999.990 1.356 ..P WKT 2010 05 26 22 34 55 31.3200 -97.3300 251.000 30.0 136.594 4.240 -999.990 -999.990 1.366 ..P WKT 2010 05 26 22 39 55 31.3200 -97.3300 251.000 122.0 142.631 4.320 -999.990 -999.990 1.426 ..P WKT 2010 05 26 22 44 55 31.3200 -97.3300 251.000 457.0 131.723 2.840 -999.990 -999.990 1.317 ..P WKT 2010 05 26 22 54 55 31.3200 -97.3300 251.000 30.0 134.874 4.120 -999.990 -999.990 1.349 ..P WKT 2010 05 26 22 59 55 31.3200 -97.3300 251.000 122.0 142.214 3.480 -999.990 -999.990 1.422 ..P WKT 2010 05 26 23 04 55 31.3200 -97.3300 251.000 457.0 132.182 2.700 -999.990 -999.990 1.322 ..P WKT 2010 05 26 23 09 55 31.3200 -97.3300 251.000 30.0 136.441 4.030 -999.990 -999.990 1.364 ..P WKT 2010 05 26 23 14 55 31.3200 -97.3300 251.000 122.0 132.712 3.090 -999.990 -999.990 1.327 ..P WKT 2010 05 26 23 19 55 31.3200 -97.3300 251.000 457.0 126.179 2.730 -999.990 -999.990 1.262 ..P WKT 2010 05 26 23 29 55 31.3200 -97.3300 251.000 30.0 127.019 3.070 -999.990 -999.990 1.270 ..P WKT 2010 05 26 23 34 55 31.3200 -97.3300 251.000 122.0 137.618 3.940 -999.990 -999.990 1.376 ..P WKT 2010 05 26 23 39 55 31.3200 -97.3300 251.000 457.0 128.871 3.950 -999.990 -999.990 1.289 ..P WKT 2010 05 26 23 44 55 31.3200 -97.3300 251.000 30.0 127.833 3.370 -999.990 -999.990 1.278 ..P WKT 2010 05 26 23 49 55 31.3200 -97.3300 251.000 122.0 130.582 3.110 -999.990 -999.990 1.306 ..P WKT 2010 05 27 00 09 55 31.3200 -97.3300 251.000 457.0 129.561 3.960 -999.990 -999.990 1.296 ..P WKT 2010 05 27 00 10 25 31.3200 -97.3300 251.000 457.0 137.982 3.690 -999.990 -999.990 1.380 ..P WKT 2010 05 27 00 10 55 31.3200 -97.3300 251.000 457.0 137.006 4.490 -999.990 -999.990 1.370 ..P WKT 2010 05 27 00 11 25 31.3200 -97.3300 251.000 457.0 133.364 3.090 -999.990 -999.990 1.334 ..P WKT 2010 05 27 00 11 55 31.3200 -97.3300 251.000 457.0 136.454 2.820 -999.990 -999.990 1.365 ..P WKT 2010 05 27 00 12 25 31.3200 -97.3300 251.000 457.0 134.215 3.680 -999.990 -999.990 1.342 ..P WKT 2010 05 27 00 12 55 31.3200 -97.3300 251.000 457.0 138.568 3.300 -999.990 -999.990 1.386 ..P WKT 2010 05 27 00 13 25 31.3200 -97.3300 251.000 457.0 133.805 3.110 -999.990 -999.990 1.338 ..P WKT 2010 05 27 00 13 55 31.3200 -97.3300 251.000 457.0 133.249 2.690 -999.990 -999.990 1.332 ..P WKT 2010 05 27 00 14 25 31.3200 -97.3300 251.000 457.0 131.570 3.670 -999.990 -999.990 1.316 ..P WKT 2010 05 27 00 14 55 31.3200 -97.3300 251.000 457.0 132.978 2.660 -999.990 -999.990 1.330 ..P WKT 2010 05 27 00 19 55 31.3200 -97.3300 251.000 30.0 136.955 3.190 -999.990 -999.990 1.370 ..P WKT 2010 05 27 00 24 55 31.3200 -97.3300 251.000 122.0 146.261 3.240 -999.990 -999.990 1.463 ..P WKT 2010 05 27 00 29 55 31.3200 -97.3300 251.000 457.0 138.317 2.920 -999.990 -999.990 1.383 ..P WKT 2010 05 27 00 34 55 31.3200 -97.3300 251.000 30.0 140.891 2.970 -999.990 -999.990 1.409 ..P WKT 2010 05 27 00 39 55 31.3200 -97.3300 251.000 122.0 143.183 3.700 -999.990 -999.990 1.432 ..P WKT 2010 05 27 00 44 55 31.3200 -97.3300 251.000 457.0 139.589 4.160 -999.990 -999.990 1.396 ..P WKT 2010 05 27 00 54 55 31.3200 -97.3300 251.000 30.0 139.330 4.280 -999.990 -999.990 1.393 ..P WKT 2010 05 27 00 59 55 31.3200 -97.3300 251.000 122.0 135.938 3.000 -999.990 -999.990 1.359 ..P WKT 2010 05 27 01 04 55 31.3200 -97.3300 251.000 457.0 134.509 4.790 -999.990 -999.990 1.345 ..P WKT 2010 05 27 01 09 55 31.3200 -97.3300 251.000 30.0 147.934 2.660 -999.990 -999.990 1.479 ..P WKT 2010 05 27 01 14 55 31.3200 -97.3300 251.000 122.0 137.256 3.000 -999.990 -999.990 1.373 ..P WKT 2010 05 27 01 19 55 31.3200 -97.3300 251.000 457.0 128.261 3.370 -999.990 -999.990 1.283 ..P WKT 2010 05 27 01 29 55 31.3200 -97.3300 251.000 30.0 132.250 2.540 -999.990 -999.990 1.323 ..P WKT 2010 05 27 01 34 55 31.3200 -97.3300 251.000 122.0 134.303 2.530 -999.990 -999.990 1.343 ..P WKT 2010 05 27 01 39 55 31.3200 -97.3300 251.000 457.0 130.474 3.060 -999.990 -999.990 1.305 ..P WKT 2010 05 27 01 44 55 31.3200 -97.3300 251.000 30.0 136.169 2.530 -999.990 -999.990 1.362 ..P WKT 2010 05 27 01 49 55 31.3200 -97.3300 251.000 122.0 131.780 3.970 -999.990 -999.990 1.318 ..P WKT 2010 05 27 01 54 55 31.3200 -97.3300 251.000 457.0 132.433 4.300 -999.990 -999.990 1.324 ..P WKT 2010 05 27 02 04 55 31.3200 -97.3300 251.000 30.0 139.539 2.990 -999.990 -999.990 1.395 ..P WKT 2010 05 27 02 09 55 31.3200 -97.3300 251.000 122.0 139.550 3.620 -999.990 -999.990 1.396 ..P WKT 2010 05 27 02 14 55 31.3200 -97.3300 251.000 457.0 136.202 2.400 -999.990 -999.990 1.362 ..P WKT 2010 05 27 02 19 55 31.3200 -97.3300 251.000 30.0 142.934 2.380 -999.990 -999.990 1.429 ..P WKT 2010 05 27 02 24 55 31.3200 -97.3300 251.000 122.0 131.748 3.140 -999.990 -999.990 1.317 ..P WKT 2010 05 27 02 29 55 31.3200 -97.3300 251.000 457.0 140.158 2.450 -999.990 -999.990 1.402 ..P WKT 2010 05 27 02 39 55 31.3200 -97.3300 251.000 30.0 135.924 2.400 -999.990 -999.990 1.359 ..P WKT 2010 05 27 02 44 55 31.3200 -97.3300 251.000 122.0 143.012 2.490 -999.990 -999.990 1.430 ..P WKT 2010 05 27 02 49 55 31.3200 -97.3300 251.000 457.0 140.025 2.740 -999.990 -999.990 1.400 ..P WKT 2010 05 27 02 54 55 31.3200 -97.3300 251.000 30.0 136.760 2.980 -999.990 -999.990 1.368 ..P WKT 2010 05 27 02 59 55 31.3200 -97.3300 251.000 122.0 135.593 2.410 -999.990 -999.990 1.356 ..P WKT 2010 05 27 03 04 55 31.3200 -97.3300 251.000 457.0 142.959 2.430 -999.990 -999.990 1.430 ..P WKT 2010 05 27 03 14 55 31.3200 -97.3300 251.000 30.0 134.351 2.470 -999.990 -999.990 1.344 ..P WKT 2010 05 27 03 19 55 31.3200 -97.3300 251.000 122.0 137.261 3.230 -999.990 -999.990 1.373 ..P WKT 2010 05 27 03 24 55 31.3200 -97.3300 251.000 457.0 134.156 4.390 -999.990 -999.990 1.342 ..P WKT 2010 05 27 03 29 55 31.3200 -97.3300 251.000 30.0 133.010 2.690 -999.990 -999.990 1.330 ..P WKT 2010 05 27 03 34 55 31.3200 -97.3300 251.000 122.0 131.445 3.020 -999.990 -999.990 1.314 ..P WKT 2010 05 27 03 39 55 31.3200 -97.3300 251.000 457.0 130.859 3.330 -999.990 -999.990 1.309 ..P WKT 2010 05 27 03 49 55 31.3200 -97.3300 251.000 30.0 135.517 3.230 -999.990 -999.990 1.355 ..P WKT 2010 05 27 03 54 55 31.3200 -97.3300 251.000 122.0 134.890 2.600 -999.990 -999.990 1.349 ..P WKT 2010 05 27 03 59 55 31.3200 -97.3300 251.000 457.0 137.059 3.790 -999.990 -999.990 1.371 ..P WKT 2010 05 27 04 04 55 31.3200 -97.3300 251.000 30.0 140.205 4.180 -999.990 -999.990 1.402 ..P WKT 2010 05 27 04 09 55 31.3200 -97.3300 251.000 122.0 136.085 3.350 -999.990 -999.990 1.361 ..P WKT 2010 05 27 04 14 55 31.3200 -97.3300 251.000 457.0 136.297 3.260 -999.990 -999.990 1.363 ..P WKT 2010 05 27 04 24 55 31.3200 -97.3300 251.000 30.0 134.046 4.160 -999.990 -999.990 1.340 ..P WKT 2010 05 27 04 29 55 31.3200 -97.3300 251.000 122.0 136.613 3.440 -999.990 -999.990 1.366 ..P WKT 2010 05 27 04 34 55 31.3200 -97.3300 251.000 457.0 133.592 5.230 -999.990 -999.990 1.336 ..P WKT 2010 05 27 04 39 55 31.3200 -97.3300 251.000 30.0 139.510 3.950 -999.990 -999.990 1.395 ..P WKT 2010 05 27 04 44 55 31.3200 -97.3300 251.000 122.0 137.887 3.780 -999.990 -999.990 1.379 ..P WKT 2010 05 27 04 49 55 31.3200 -97.3300 251.000 457.0 136.821 3.830 -999.990 -999.990 1.368 ..P WKT 2010 05 27 05 04 55 31.3200 -97.3300 251.000 30.0 154.619 4.060 -999.990 -999.990 1.546 ..P WKT 2010 05 27 05 09 55 31.3200 -97.3300 251.000 122.0 148.133 3.380 -999.990 -999.990 1.481 ..P WKT 2010 05 27 05 14 55 31.3200 -97.3300 251.000 457.0 139.694 4.100 -999.990 -999.990 1.397 ..P WKT 2010 05 27 05 19 55 31.3200 -97.3300 251.000 30.0 153.031 3.330 -999.990 -999.990 1.530 ..P WKT 2010 05 27 05 24 55 31.3200 -97.3300 251.000 122.0 142.360 2.880 -999.990 -999.990 1.424 ..P WKT 2010 05 27 05 29 55 31.3200 -97.3300 251.000 457.0 137.831 3.340 -999.990 -999.990 1.378 ..P WKT 2010 05 27 05 39 55 31.3200 -97.3300 251.000 30.0 155.282 2.950 -999.990 -999.990 1.553 ..P WKT 2010 05 27 05 44 55 31.3200 -97.3300 251.000 122.0 148.516 4.300 -999.990 -999.990 1.485 ..P WKT 2010 05 27 05 49 55 31.3200 -97.3300 251.000 457.0 137.007 2.980 -999.990 -999.990 1.370 ..P WKT 2010 05 27 05 54 55 31.3200 -97.3300 251.000 30.0 154.517 4.300 -999.990 -999.990 1.545 ..P WKT 2010 05 27 05 59 55 31.3200 -97.3300 251.000 122.0 145.521 3.050 -999.990 -999.990 1.455 ..P WKT 2010 05 27 06 04 55 31.3200 -97.3300 251.000 457.0 129.831 3.470 -999.990 -999.990 1.298 ..P WKT 2010 05 27 06 14 55 31.3200 -97.3300 251.000 30.0 155.597 2.960 -999.990 -999.990 1.556 ..P WKT 2010 05 27 06 19 55 31.3200 -97.3300 251.000 122.0 151.583 3.720 -999.990 -999.990 1.516 ..P WKT 2010 05 27 06 24 55 31.3200 -97.3300 251.000 457.0 130.838 3.750 -999.990 -999.990 1.308 ..P WKT 2010 05 27 06 29 55 31.3200 -97.3300 251.000 30.0 155.688 3.440 -999.990 -999.990 1.557 ..P WKT 2010 05 27 06 34 55 31.3200 -97.3300 251.000 122.0 143.590 3.680 -999.990 -999.990 1.436 ..P WKT 2010 05 27 06 39 55 31.3200 -97.3300 251.000 457.0 130.518 4.330 -999.990 -999.990 1.305 ..P WKT 2010 05 27 06 49 55 31.3200 -97.3300 251.000 30.0 154.675 5.110 -999.990 -999.990 1.547 ..P WKT 2010 05 27 06 54 55 31.3200 -97.3300 251.000 122.0 147.300 3.090 -999.990 -999.990 1.473 ..P WKT 2010 05 27 06 59 55 31.3200 -97.3300 251.000 457.0 133.932 4.230 -999.990 -999.990 1.339 ..P WKT 2010 05 27 07 04 55 31.3200 -97.3300 251.000 30.0 153.872 5.220 -999.990 -999.990 1.539 ..P WKT 2010 05 27 07 09 55 31.3200 -97.3300 251.000 122.0 147.613 2.800 -999.990 -999.990 1.476 ..P WKT 2010 05 27 07 14 55 31.3200 -97.3300 251.000 457.0 135.503 3.930 -999.990 -999.990 1.355 ..P WKT 2010 05 27 07 24 55 31.3200 -97.3300 251.000 30.0 148.144 2.530 -999.990 -999.990 1.481 ..P WKT 2010 05 27 07 29 55 31.3200 -97.3300 251.000 122.0 143.777 2.710 -999.990 -999.990 1.438 ..P WKT 2010 05 27 07 34 55 31.3200 -97.3300 251.000 457.0 137.879 4.480 -999.990 -999.990 1.379 ..P WKT 2010 05 27 07 39 55 31.3200 -97.3300 251.000 30.0 150.227 4.810 -999.990 -999.990 1.502 ..P WKT 2010 05 27 07 44 55 31.3200 -97.3300 251.000 122.0 143.494 4.300 -999.990 -999.990 1.435 ..P WKT 2010 05 27 07 49 55 31.3200 -97.3300 251.000 457.0 134.534 2.840 -999.990 -999.990 1.345 ..P WKT 2010 05 27 07 59 55 31.3200 -97.3300 251.000 30.0 152.777 4.340 -999.990 -999.990 1.528 ..P WKT 2010 05 27 08 04 55 31.3200 -97.3300 251.000 122.0 149.487 4.090 -999.990 -999.990 1.495 ..P WKT 2010 05 27 08 09 55 31.3200 -97.3300 251.000 457.0 136.314 4.570 -999.990 -999.990 1.363 ..P WKT 2010 05 27 08 14 55 31.3200 -97.3300 251.000 30.0 152.929 4.150 -999.990 -999.990 1.529 ..P WKT 2010 05 27 08 19 55 31.3200 -97.3300 251.000 122.0 150.614 4.990 -999.990 -999.990 1.506 ..P WKT 2010 05 27 08 24 55 31.3200 -97.3300 251.000 457.0 134.243 4.460 -999.990 -999.990 1.342 ..P WKT 2010 05 27 08 34 55 31.3200 -97.3300 251.000 30.0 155.736 4.020 -999.990 -999.990 1.557 ..P WKT 2010 05 27 08 39 55 31.3200 -97.3300 251.000 122.0 152.964 4.060 -999.990 -999.990 1.530 ..P WKT 2010 05 27 08 44 55 31.3200 -97.3300 251.000 457.0 133.219 4.250 -999.990 -999.990 1.332 ..P WKT 2010 05 27 08 49 55 31.3200 -97.3300 251.000 30.0 154.377 3.640 -999.990 -999.990 1.544 ..P WKT 2010 05 27 08 54 55 31.3200 -97.3300 251.000 122.0 151.884 2.760 -999.990 -999.990 1.519 ..P WKT 2010 05 27 08 59 55 31.3200 -97.3300 251.000 457.0 134.369 2.800 -999.990 -999.990 1.344 ..P WKT 2010 05 27 09 09 55 31.3200 -97.3300 251.000 30.0 154.460 2.810 -999.990 -999.990 1.545 ..P WKT 2010 05 27 09 14 55 31.3200 -97.3300 251.000 122.0 161.185 5.050 -999.990 -999.990 1.612 ..P WKT 2010 05 27 09 19 55 31.3200 -97.3300 251.000 457.0 138.431 3.790 -999.990 -999.990 1.384 ..P WKT 2010 05 27 09 24 55 31.3200 -97.3300 251.000 30.0 159.617 3.710 -999.990 -999.990 1.596 ..P WKT 2010 05 27 09 29 55 31.3200 -97.3300 251.000 122.0 148.267 3.360 -999.990 -999.990 1.483 ..P WKT 2010 05 27 09 34 55 31.3200 -97.3300 251.000 457.0 133.581 2.650 -999.990 -999.990 1.336 ..P WKT 2010 05 27 09 44 55 31.3200 -97.3300 251.000 30.0 157.990 3.330 -999.990 -999.990 1.580 ..P WKT 2010 05 27 09 49 55 31.3200 -97.3300 251.000 122.0 141.481 2.670 -999.990 -999.990 1.415 ..P WKT 2010 05 27 09 54 55 31.3200 -97.3300 251.000 457.0 135.259 3.400 -999.990 -999.990 1.353 ..P WKT 2010 05 27 09 59 55 31.3200 -97.3300 251.000 30.0 160.443 3.930 -999.990 -999.990 1.604 ..P WKT 2010 05 27 10 04 55 31.3200 -97.3300 251.000 122.0 141.993 3.480 -999.990 -999.990 1.420 ..P WKT 2010 05 27 10 09 55 31.3200 -97.3300 251.000 457.0 131.327 3.140 -999.990 -999.990 1.313 ..P WKT 2010 05 27 10 19 55 31.3200 -97.3300 251.000 30.0 161.615 3.300 -999.990 -999.990 1.616 ..P WKT 2010 05 27 10 24 55 31.3200 -97.3300 251.000 122.0 155.057 3.700 -999.990 -999.990 1.551 ..P WKT 2010 05 27 10 29 55 31.3200 -97.3300 251.000 457.0 132.944 3.870 -999.990 -999.990 1.329 ..P WKT 2010 05 27 10 34 55 31.3200 -97.3300 251.000 30.0 169.859 3.880 -999.990 -999.990 1.699 ..P WKT 2010 05 27 10 39 55 31.3200 -97.3300 251.000 122.0 152.471 4.780 -999.990 -999.990 1.525 ..P WKT 2010 05 27 10 44 55 31.3200 -97.3300 251.000 457.0 141.056 3.500 -999.990 -999.990 1.411 ..P WKT 2010 05 27 10 54 55 31.3200 -97.3300 251.000 30.0 167.002 3.560 -999.990 -999.990 1.670 ..P WKT 2010 05 27 10 59 55 31.3200 -97.3300 251.000 122.0 155.489 4.060 -999.990 -999.990 1.555 ..P WKT 2010 05 27 11 04 55 31.3200 -97.3300 251.000 457.0 139.953 3.860 -999.990 -999.990 1.400 ..P WKT 2010 05 27 11 09 55 31.3200 -97.3300 251.000 30.0 159.675 4.400 -999.990 -999.990 1.597 ..P WKT 2010 05 27 11 14 55 31.3200 -97.3300 251.000 122.0 152.329 4.310 -999.990 -999.990 1.523 ..P WKT 2010 05 27 11 19 55 31.3200 -97.3300 251.000 457.0 141.376 3.040 -999.990 -999.990 1.414 ..P WKT 2010 05 27 11 29 55 31.3200 -97.3300 251.000 30.0 154.490 4.200 -999.990 -999.990 1.545 ..P WKT 2010 05 27 11 34 55 31.3200 -97.3300 251.000 122.0 149.276 3.140 -999.990 -999.990 1.493 ..P WKT 2010 05 27 11 39 55 31.3200 -97.3300 251.000 457.0 137.403 2.970 -999.990 -999.990 1.374 ..P WKT 2010 05 27 11 44 55 31.3200 -97.3300 251.000 30.0 160.767 3.210 -999.990 -999.990 1.608 ..P WKT 2010 05 27 11 49 55 31.3200 -97.3300 251.000 122.0 150.421 4.620 -999.990 -999.990 1.504 ..P WKT 2010 05 27 12 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 10 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 10 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 11 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 11 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 12 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 12 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 13 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 13 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 14 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 12 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 13 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 13 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 13 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 13 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 13 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 13 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 13 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 13 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 13 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 13 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 14 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 14 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 14 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 14 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 14 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 14 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 14 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 14 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 14 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 14 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 14 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 15 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 15 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 15 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 15 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 15 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 15 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 15 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 15 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 15 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 15 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 16 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 16 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 16 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 16 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 16 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 16 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 16 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 16 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 16 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 17 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 17 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 17 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 17 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 17 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 17 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 17 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 17 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 17 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 17 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 17 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 18 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 18 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 18 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 18 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 18 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 18 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 18 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 18 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 18 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 27 18 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 10 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 10 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 11 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 11 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 12 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 12 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 13 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 13 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 14 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 00 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 01 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 01 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 01 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 01 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 01 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 01 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 01 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 01 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 01 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 01 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 02 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 02 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 02 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 02 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 02 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 02 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 02 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 02 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 02 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 02 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 02 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 03 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 03 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 03 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 03 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 03 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 03 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 03 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 03 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 03 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 03 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 04 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 04 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 04 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 04 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 04 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 04 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 04 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 04 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 04 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 05 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 05 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 05 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 05 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 05 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 05 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 05 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 05 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 05 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 05 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 05 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 06 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 06 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 06 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 06 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 06 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 06 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 06 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 06 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 06 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 06 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 07 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 07 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 07 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 07 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 07 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 07 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 07 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 07 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 07 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 07 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 08 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 08 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 08 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 08 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 08 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 08 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 08 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 08 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 08 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 08 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 08 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 09 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 09 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 09 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 09 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 09 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 09 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 09 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 09 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 09 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 09 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 10 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 10 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 10 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 10 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 10 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 10 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 10 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 10 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 10 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 10 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 11 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 11 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 11 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 11 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 11 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 11 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 11 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 11 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 11 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 10 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 10 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 11 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 11 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 12 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 12 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 13 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 13 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 14 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 12 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 13 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 13 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 13 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 13 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 13 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 13 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 13 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 13 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 13 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 13 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 40 25 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 40 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 41 25 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 41 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 42 25 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 42 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 43 25 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 43 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 44 25 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 14 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 15 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 15 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 15 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 15 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 15 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 15 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 15 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 15 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 15 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 15 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 16 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 16 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 16 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 16 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 16 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 16 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 28 16 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 28 16 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 28 16 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 05 28 17 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 17 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 17 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 17 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 17 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 17 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 17 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 17 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 17 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 17 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 17 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 18 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 18 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 18 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 18 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 18 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 18 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 18 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 18 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 18 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 18 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 19 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 19 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 19 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 19 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 19 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 19 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 19 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 19 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 19 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 19 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 20 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 20 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 20 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 20 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 20 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 20 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 20 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 20 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 20 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 20 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 20 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 21 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 21 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 21 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 21 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 21 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 21 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 21 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 21 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 21 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 21 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 05 28 22 04 55 31.3200 -97.3300 251.000 122.0 157.774 3.430 -999.990 -999.990 1.578 ..P WKT 2010 05 28 22 09 55 31.3200 -97.3300 251.000 457.0 155.945 3.800 -999.990 -999.990 1.559 ..P WKT 2010 05 28 22 19 55 31.3200 -97.3300 251.000 30.0 145.451 3.500 -999.990 -999.990 1.455 ..P WKT 2010 05 28 22 24 55 31.3200 -97.3300 251.000 122.0 151.321 4.300 -999.990 -999.990 1.513 ..P WKT 2010 05 28 22 29 55 31.3200 -97.3300 251.000 457.0 138.271 3.700 -999.990 -999.990 1.383 ..P WKT 2010 05 28 22 34 55 31.3200 -97.3300 251.000 30.0 136.054 3.500 -999.990 -999.990 1.361 ..P WKT 2010 05 28 22 39 55 31.3200 -97.3300 251.000 122.0 143.841 4.260 -999.990 -999.990 1.438 ..P WKT 2010 05 28 22 44 55 31.3200 -97.3300 251.000 457.0 136.690 3.570 -999.990 -999.990 1.367 ..P WKT 2010 05 28 22 54 55 31.3200 -97.3300 251.000 30.0 144.842 4.280 -999.990 -999.990 1.448 ..P WKT 2010 05 28 22 59 55 31.3200 -97.3300 251.000 122.0 153.973 3.610 -999.990 -999.990 1.540 ..P WKT 2010 05 28 23 04 55 31.3200 -97.3300 251.000 457.0 151.599 3.970 -999.990 -999.990 1.516 ..P WKT 2010 05 28 23 09 55 31.3200 -97.3300 251.000 30.0 144.432 3.410 -999.990 -999.990 1.444 ..P WKT 2010 05 28 23 14 55 31.3200 -97.3300 251.000 122.0 151.370 3.450 -999.990 -999.990 1.514 ..P WKT 2010 05 28 23 19 55 31.3200 -97.3300 251.000 457.0 144.889 3.540 -999.990 -999.990 1.449 ..P WKT 2010 05 28 23 29 55 31.3200 -97.3300 251.000 30.0 141.517 3.750 -999.990 -999.990 1.415 ..P WKT 2010 05 28 23 34 55 31.3200 -97.3300 251.000 122.0 148.728 3.470 -999.990 -999.990 1.487 ..P WKT 2010 05 28 23 39 55 31.3200 -97.3300 251.000 457.0 140.749 3.520 -999.990 -999.990 1.407 ..P WKT 2010 05 28 23 44 55 31.3200 -97.3300 251.000 30.0 144.674 3.940 -999.990 -999.990 1.447 ..P WKT 2010 05 28 23 49 55 31.3200 -97.3300 251.000 122.0 150.241 3.410 -999.990 -999.990 1.502 ..P WKT 2010 05 29 00 09 55 31.3200 -97.3300 251.000 457.0 145.125 3.930 -999.990 -999.990 1.451 ..P WKT 2010 05 29 00 10 25 31.3200 -97.3300 251.000 457.0 142.525 3.570 -999.990 -999.990 1.425 ..P WKT 2010 05 29 00 10 55 31.3200 -97.3300 251.000 457.0 151.145 4.150 -999.990 -999.990 1.511 ..P WKT 2010 05 29 00 11 25 31.3200 -97.3300 251.000 457.0 148.271 4.150 -999.990 -999.990 1.483 ..P WKT 2010 05 29 00 11 55 31.3200 -97.3300 251.000 457.0 143.209 4.700 -999.990 -999.990 1.432 ..P WKT 2010 05 29 00 12 25 31.3200 -97.3300 251.000 457.0 137.873 3.710 -999.990 -999.990 1.379 ..P WKT 2010 05 29 00 12 55 31.3200 -97.3300 251.000 457.0 139.651 3.560 -999.990 -999.990 1.397 ..P WKT 2010 05 29 00 13 25 31.3200 -97.3300 251.000 457.0 140.609 3.640 -999.990 -999.990 1.406 ..P WKT 2010 05 29 00 13 55 31.3200 -97.3300 251.000 457.0 137.188 3.930 -999.990 -999.990 1.372 ..P WKT 2010 05 29 00 14 25 31.3200 -97.3300 251.000 457.0 138.419 3.650 -999.990 -999.990 1.384 ..P WKT 2010 05 29 00 14 55 31.3200 -97.3300 251.000 457.0 140.745 5.440 -999.990 -999.990 1.407 ..P WKT 2010 05 29 00 19 55 31.3200 -97.3300 251.000 30.0 136.911 3.750 -999.990 -999.990 1.369 ..P WKT 2010 05 29 00 24 55 31.3200 -97.3300 251.000 122.0 144.300 4.300 -999.990 -999.990 1.443 ..P WKT 2010 05 29 00 29 55 31.3200 -97.3300 251.000 457.0 132.800 4.010 -999.990 -999.990 1.328 ..P WKT 2010 05 29 00 34 55 31.3200 -97.3300 251.000 30.0 138.000 4.150 -999.990 -999.990 1.380 ..P WKT 2010 05 29 00 39 55 31.3200 -97.3300 251.000 122.0 140.462 4.440 -999.990 -999.990 1.405 ..P WKT 2010 05 29 00 44 55 31.3200 -97.3300 251.000 457.0 144.296 5.350 -999.990 -999.990 1.443 ..P WKT 2010 05 29 00 54 55 31.3200 -97.3300 251.000 30.0 141.661 4.890 -999.990 -999.990 1.417 ..P WKT 2010 05 29 00 59 55 31.3200 -97.3300 251.000 122.0 147.525 4.050 -999.990 -999.990 1.475 ..P WKT 2010 05 29 01 04 55 31.3200 -97.3300 251.000 457.0 142.424 4.100 -999.990 -999.990 1.424 ..P WKT 2010 05 29 01 09 55 31.3200 -97.3300 251.000 30.0 148.289 3.990 -999.990 -999.990 1.483 ..P WKT 2010 05 29 01 14 55 31.3200 -97.3300 251.000 122.0 150.317 3.440 -999.990 -999.990 1.503 ..P WKT 2010 05 29 01 19 55 31.3200 -97.3300 251.000 457.0 139.455 3.890 -999.990 -999.990 1.395 ..P WKT 2010 05 29 01 29 55 31.3200 -97.3300 251.000 30.0 142.843 3.840 -999.990 -999.990 1.428 ..P WKT 2010 05 29 01 34 55 31.3200 -97.3300 251.000 122.0 146.401 3.780 -999.990 -999.990 1.464 ..P WKT 2010 05 29 01 39 55 31.3200 -97.3300 251.000 457.0 154.076 3.840 -999.990 -999.990 1.541 ..P WKT 2010 05 29 01 44 55 31.3200 -97.3300 251.000 30.0 143.087 3.890 -999.990 -999.990 1.431 ..P WKT 2010 05 29 01 49 55 31.3200 -97.3300 251.000 122.0 147.196 4.800 -999.990 -999.990 1.472 ..P WKT 2010 05 29 01 54 55 31.3200 -97.3300 251.000 457.0 143.066 4.400 -999.990 -999.990 1.431 ..P WKT 2010 05 29 02 04 55 31.3200 -97.3300 251.000 30.0 155.742 4.860 -999.990 -999.990 1.557 ..P WKT 2010 05 29 02 09 55 31.3200 -97.3300 251.000 122.0 146.588 4.520 -999.990 -999.990 1.466 ..P WKT 2010 05 29 02 14 55 31.3200 -97.3300 251.000 457.0 141.829 4.500 -999.990 -999.990 1.418 ..P WKT 2010 05 29 02 19 55 31.3200 -97.3300 251.000 30.0 146.687 4.360 -999.990 -999.990 1.467 ..P WKT 2010 05 29 02 24 55 31.3200 -97.3300 251.000 122.0 142.339 4.640 -999.990 -999.990 1.423 ..P WKT 2010 05 29 02 29 55 31.3200 -97.3300 251.000 457.0 138.950 4.150 -999.990 -999.990 1.389 ..P WKT 2010 05 29 02 39 55 31.3200 -97.3300 251.000 30.0 167.315 4.200 -999.990 -999.990 1.673 ..P WKT 2010 05 29 02 44 55 31.3200 -97.3300 251.000 122.0 148.604 3.990 -999.990 -999.990 1.486 ..P WKT 2010 05 29 02 49 55 31.3200 -97.3300 251.000 457.0 149.420 4.690 -999.990 -999.990 1.494 ..P WKT 2010 05 29 02 54 55 31.3200 -97.3300 251.000 30.0 155.878 4.120 -999.990 -999.990 1.559 ..P WKT 2010 05 29 02 59 55 31.3200 -97.3300 251.000 122.0 144.035 3.960 -999.990 -999.990 1.440 ..P WKT 2010 05 29 03 04 55 31.3200 -97.3300 251.000 457.0 144.300 3.810 -999.990 -999.990 1.443 ..P WKT 2010 05 29 03 14 55 31.3200 -97.3300 251.000 30.0 151.873 4.040 -999.990 -999.990 1.519 ..P WKT 2010 05 29 03 19 55 31.3200 -97.3300 251.000 122.0 145.136 3.980 -999.990 -999.990 1.451 ..P WKT 2010 05 29 03 24 55 31.3200 -97.3300 251.000 457.0 143.907 4.640 -999.990 -999.990 1.439 ..P WKT 2010 05 29 03 29 55 31.3200 -97.3300 251.000 30.0 152.320 4.620 -999.990 -999.990 1.523 ..P WKT 2010 05 29 03 34 55 31.3200 -97.3300 251.000 122.0 148.886 4.180 -999.990 -999.990 1.489 ..P WKT 2010 05 29 03 39 55 31.3200 -97.3300 251.000 457.0 149.310 4.380 -999.990 -999.990 1.493 ..P WKT 2010 05 29 03 49 55 31.3200 -97.3300 251.000 30.0 150.119 4.580 -999.990 -999.990 1.501 ..P WKT 2010 05 29 03 54 55 31.3200 -97.3300 251.000 122.0 148.573 4.020 -999.990 -999.990 1.486 ..P WKT 2010 05 29 03 59 55 31.3200 -97.3300 251.000 457.0 142.063 4.390 -999.990 -999.990 1.421 ..P WKT 2010 05 29 04 04 55 31.3200 -97.3300 251.000 30.0 143.550 4.200 -999.990 -999.990 1.436 ..P WKT 2010 05 29 04 09 55 31.3200 -97.3300 251.000 122.0 140.624 4.610 -999.990 -999.990 1.406 ..P WKT 2010 05 29 04 14 55 31.3200 -97.3300 251.000 457.0 145.423 4.100 -999.990 -999.990 1.454 ..P WKT 2010 05 29 04 24 55 31.3200 -97.3300 251.000 30.0 141.618 4.100 -999.990 -999.990 1.416 ..P WKT 2010 05 29 04 29 55 31.3200 -97.3300 251.000 122.0 148.470 4.060 -999.990 -999.990 1.485 ..P WKT 2010 05 29 04 34 55 31.3200 -97.3300 251.000 457.0 147.040 4.660 -999.990 -999.990 1.470 ..P WKT 2010 05 29 04 39 55 31.3200 -97.3300 251.000 30.0 145.058 6.430 -999.990 -999.990 1.451 ..P WKT 2010 05 29 04 44 55 31.3200 -97.3300 251.000 122.0 149.428 4.940 -999.990 -999.990 1.494 ..P WKT 2010 05 29 04 49 55 31.3200 -97.3300 251.000 457.0 148.828 4.180 -999.990 -999.990 1.488 ..P WKT 2010 05 29 05 04 55 31.3200 -97.3300 251.000 30.0 132.254 4.390 -999.990 -999.990 1.323 ..P WKT 2010 05 29 05 09 55 31.3200 -97.3300 251.000 122.0 168.913 5.590 -999.990 -999.990 1.689 ..P WKT 2010 05 29 05 14 55 31.3200 -97.3300 251.000 457.0 149.176 6.720 -999.990 -999.990 1.492 ..P WKT 2010 05 29 05 19 55 31.3200 -97.3300 251.000 30.0 133.580 3.770 -999.990 -999.990 1.336 ..P WKT 2010 05 29 05 24 55 31.3200 -97.3300 251.000 122.0 153.663 5.440 -999.990 -999.990 1.537 ..P WKT 2010 05 29 05 29 55 31.3200 -97.3300 251.000 457.0 140.276 3.920 -999.990 -999.990 1.403 ..P WKT 2010 05 29 05 39 55 31.3200 -97.3300 251.000 30.0 148.794 5.260 -999.990 -999.990 1.488 ..P WKT 2010 05 29 05 44 55 31.3200 -97.3300 251.000 122.0 134.174 5.330 -999.990 -999.990 1.342 ..P WKT 2010 05 29 05 49 55 31.3200 -97.3300 251.000 457.0 140.173 4.270 -999.990 -999.990 1.402 ..P WKT 2010 05 29 05 54 55 31.3200 -97.3300 251.000 30.0 150.052 4.450 -999.990 -999.990 1.501 ..P WKT 2010 05 29 05 59 55 31.3200 -97.3300 251.000 122.0 141.932 3.830 -999.990 -999.990 1.419 ..P WKT 2010 05 29 06 04 55 31.3200 -97.3300 251.000 457.0 157.354 4.340 -999.990 -999.990 1.574 ..P WKT 2010 05 29 06 14 55 31.3200 -97.3300 251.000 30.0 143.247 4.040 -999.990 -999.990 1.432 ..P WKT 2010 05 29 06 19 55 31.3200 -97.3300 251.000 122.0 135.596 4.590 -999.990 -999.990 1.356 ..P WKT 2010 05 29 06 24 55 31.3200 -97.3300 251.000 457.0 139.306 4.100 -999.990 -999.990 1.393 ..P WKT 2010 05 29 06 29 55 31.3200 -97.3300 251.000 30.0 144.127 4.060 -999.990 -999.990 1.441 ..P WKT 2010 05 29 06 34 55 31.3200 -97.3300 251.000 122.0 139.106 4.770 -999.990 -999.990 1.391 ..P WKT 2010 05 29 06 39 55 31.3200 -97.3300 251.000 457.0 143.651 4.380 -999.990 -999.990 1.437 ..P WKT 2010 05 29 06 49 55 31.3200 -97.3300 251.000 30.0 145.038 4.280 -999.990 -999.990 1.450 ..P WKT 2010 05 29 06 54 55 31.3200 -97.3300 251.000 122.0 140.767 4.320 -999.990 -999.990 1.408 ..P WKT 2010 05 29 06 59 55 31.3200 -97.3300 251.000 457.0 146.624 4.270 -999.990 -999.990 1.466 ..P WKT 2010 05 29 07 04 55 31.3200 -97.3300 251.000 30.0 141.796 4.330 -999.990 -999.990 1.418 ..P WKT 2010 05 29 07 09 55 31.3200 -97.3300 251.000 122.0 138.633 4.040 -999.990 -999.990 1.386 ..P WKT 2010 05 29 07 14 55 31.3200 -97.3300 251.000 457.0 147.963 4.260 -999.990 -999.990 1.480 ..P WKT 2010 05 29 07 24 55 31.3200 -97.3300 251.000 30.0 144.830 4.150 -999.990 -999.990 1.448 ..P WKT 2010 05 29 07 29 55 31.3200 -97.3300 251.000 122.0 148.749 3.880 -999.990 -999.990 1.487 ..P WKT 2010 05 29 07 34 55 31.3200 -97.3300 251.000 457.0 161.284 4.530 -999.990 -999.990 1.613 ..P WKT 2010 05 29 07 39 55 31.3200 -97.3300 251.000 30.0 142.140 4.480 -999.990 -999.990 1.421 ..P WKT 2010 05 29 07 44 55 31.3200 -97.3300 251.000 122.0 155.095 4.880 -999.990 -999.990 1.551 ..P WKT 2010 05 29 07 49 55 31.3200 -97.3300 251.000 457.0 161.520 4.040 -999.990 -999.990 1.615 ..P WKT 2010 05 29 07 59 55 31.3200 -97.3300 251.000 30.0 148.793 4.140 -999.990 -999.990 1.488 ..P WKT 2010 05 29 08 04 55 31.3200 -97.3300 251.000 122.0 147.711 4.060 -999.990 -999.990 1.477 ..P WKT 2010 05 29 08 09 55 31.3200 -97.3300 251.000 457.0 151.636 3.670 -999.990 -999.990 1.516 ..P WKT 2010 05 29 08 14 55 31.3200 -97.3300 251.000 30.0 134.415 3.780 -999.990 -999.990 1.344 ..P WKT 2010 05 29 08 19 55 31.3200 -97.3300 251.000 122.0 148.080 3.890 -999.990 -999.990 1.481 ..P WKT 2010 05 29 08 24 55 31.3200 -97.3300 251.000 457.0 151.451 3.470 -999.990 -999.990 1.515 ..P WKT 2010 05 29 08 34 55 31.3200 -97.3300 251.000 30.0 148.489 3.450 -999.990 -999.990 1.485 ..P WKT 2010 05 29 08 39 55 31.3200 -97.3300 251.000 122.0 150.787 3.770 -999.990 -999.990 1.508 ..P WKT 2010 05 29 08 44 55 31.3200 -97.3300 251.000 457.0 140.831 4.330 -999.990 -999.990 1.408 ..P WKT 2010 05 29 08 49 55 31.3200 -97.3300 251.000 30.0 151.207 5.180 -999.990 -999.990 1.512 ..P WKT 2010 05 29 08 54 55 31.3200 -97.3300 251.000 122.0 156.573 4.320 -999.990 -999.990 1.566 ..P WKT 2010 05 29 08 59 55 31.3200 -97.3300 251.000 457.0 155.529 4.370 -999.990 -999.990 1.555 ..P WKT 2010 05 29 09 09 55 31.3200 -97.3300 251.000 30.0 141.753 3.440 -999.990 -999.990 1.418 ..P WKT 2010 05 29 09 14 55 31.3200 -97.3300 251.000 122.0 153.554 4.580 -999.990 -999.990 1.536 ..P WKT 2010 05 29 09 19 55 31.3200 -97.3300 251.000 457.0 168.425 5.330 -999.990 -999.990 1.684 ..P WKT 2010 05 29 09 24 55 31.3200 -97.3300 251.000 30.0 141.462 6.650 -999.990 -999.990 1.415 ..P WKT 2010 05 29 09 29 55 31.3200 -97.3300 251.000 122.0 150.479 5.860 -999.990 -999.990 1.505 ..P WKT 2010 05 29 09 34 55 31.3200 -97.3300 251.000 457.0 159.778 4.510 -999.990 -999.990 1.598 ..P WKT 2010 05 29 09 44 55 31.3200 -97.3300 251.000 30.0 147.083 4.380 -999.990 -999.990 1.471 ..P WKT 2010 05 29 09 49 55 31.3200 -97.3300 251.000 122.0 148.808 5.970 -999.990 -999.990 1.488 ..P WKT 2010 05 29 09 54 55 31.3200 -97.3300 251.000 457.0 185.297 7.640 -999.990 -999.990 1.853 ..P WKT 2010 05 29 09 59 55 31.3200 -97.3300 251.000 30.0 148.071 6.080 -999.990 -999.990 1.481 ..P WKT 2010 05 29 10 04 55 31.3200 -97.3300 251.000 122.0 150.635 4.810 -999.990 -999.990 1.506 ..P WKT 2010 05 29 10 09 55 31.3200 -97.3300 251.000 457.0 168.705 3.900 -999.990 -999.990 1.687 ..P WKT 2010 05 29 10 19 55 31.3200 -97.3300 251.000 30.0 155.698 7.280 -999.990 -999.990 1.557 ..P WKT 2010 05 29 10 24 55 31.3200 -97.3300 251.000 122.0 154.373 4.780 -999.990 -999.990 1.544 ..P WKT 2010 05 29 10 29 55 31.3200 -97.3300 251.000 457.0 164.648 5.410 -999.990 -999.990 1.646 ..P WKT 2010 05 29 10 34 55 31.3200 -97.3300 251.000 30.0 153.537 4.310 -999.990 -999.990 1.535 ..P WKT 2010 05 29 10 39 55 31.3200 -97.3300 251.000 122.0 158.922 3.470 -999.990 -999.990 1.589 ..P WKT 2010 05 29 10 44 55 31.3200 -97.3300 251.000 457.0 169.205 3.580 -999.990 -999.990 1.692 ..P WKT 2010 05 29 10 54 55 31.3200 -97.3300 251.000 30.0 150.146 3.120 -999.990 -999.990 1.501 ..P WKT 2010 05 29 10 59 55 31.3200 -97.3300 251.000 122.0 151.296 3.370 -999.990 -999.990 1.513 ..P WKT 2010 05 29 11 04 55 31.3200 -97.3300 251.000 457.0 148.807 3.200 -999.990 -999.990 1.488 ..P WKT 2010 05 29 11 09 55 31.3200 -97.3300 251.000 30.0 144.078 3.720 -999.990 -999.990 1.441 ..P WKT 2010 05 29 11 14 55 31.3200 -97.3300 251.000 122.0 149.709 4.450 -999.990 -999.990 1.497 ..P WKT 2010 05 29 11 19 55 31.3200 -97.3300 251.000 457.0 142.458 3.260 -999.990 -999.990 1.425 ..P WKT 2010 05 29 11 29 55 31.3200 -97.3300 251.000 30.0 145.704 4.910 -999.990 -999.990 1.457 ..P WKT 2010 05 29 11 34 55 31.3200 -97.3300 251.000 122.0 158.309 4.010 -999.990 -999.990 1.583 ..P WKT 2010 05 29 11 39 55 31.3200 -97.3300 251.000 457.0 179.185 4.020 -999.990 -999.990 1.792 ..P WKT 2010 05 29 11 44 55 31.3200 -97.3300 251.000 30.0 149.193 4.070 -999.990 -999.990 1.492 ..P WKT 2010 05 29 11 49 55 31.3200 -97.3300 251.000 122.0 149.469 4.580 -999.990 -999.990 1.495 ..P WKT 2010 05 29 12 09 55 31.3200 -97.3300 251.000 457.0 144.571 5.630 -999.990 -999.990 1.446 ..P WKT 2010 05 29 12 10 25 31.3200 -97.3300 251.000 457.0 140.696 4.820 -999.990 -999.990 1.407 ..P WKT 2010 05 29 12 10 55 31.3200 -97.3300 251.000 457.0 143.271 5.440 -999.990 -999.990 1.433 ..P WKT 2010 05 29 12 11 25 31.3200 -97.3300 251.000 457.0 135.470 4.720 -999.990 -999.990 1.355 ..P WKT 2010 05 29 12 11 55 31.3200 -97.3300 251.000 457.0 143.094 4.510 -999.990 -999.990 1.431 ..P WKT 2010 05 29 12 12 25 31.3200 -97.3300 251.000 457.0 143.145 4.480 -999.990 -999.990 1.431 ..P WKT 2010 05 29 12 12 55 31.3200 -97.3300 251.000 457.0 145.439 4.670 -999.990 -999.990 1.454 ..P WKT 2010 05 29 12 13 25 31.3200 -97.3300 251.000 457.0 141.565 5.470 -999.990 -999.990 1.416 ..P WKT 2010 05 29 12 13 55 31.3200 -97.3300 251.000 457.0 140.775 5.000 -999.990 -999.990 1.408 ..P WKT 2010 05 29 12 14 25 31.3200 -97.3300 251.000 457.0 136.899 4.280 -999.990 -999.990 1.369 ..P WKT 2010 05 29 12 14 55 31.3200 -97.3300 251.000 457.0 138.633 4.370 -999.990 -999.990 1.386 ..P WKT 2010 05 29 12 19 55 31.3200 -97.3300 251.000 30.0 143.914 4.880 -999.990 -999.990 1.439 ..P WKT 2010 05 29 12 24 55 31.3200 -97.3300 251.000 122.0 152.280 4.430 -999.990 -999.990 1.523 ..P WKT 2010 05 29 12 29 55 31.3200 -97.3300 251.000 457.0 173.265 4.610 -999.990 -999.990 1.733 ..P WKT 2010 05 29 12 34 55 31.3200 -97.3300 251.000 30.0 145.734 4.850 -999.990 -999.990 1.457 ..P WKT 2010 05 29 12 39 55 31.3200 -97.3300 251.000 122.0 163.914 3.490 -999.990 -999.990 1.639 ..P WKT 2010 05 29 12 44 55 31.3200 -97.3300 251.000 457.0 188.263 3.370 -999.990 -999.990 1.883 ..P WKT 2010 05 29 12 54 55 31.3200 -97.3300 251.000 30.0 157.952 3.620 -999.990 -999.990 1.580 ..P WKT 2010 05 29 12 59 55 31.3200 -97.3300 251.000 122.0 159.938 3.320 -999.990 -999.990 1.599 ..P WKT 2010 05 29 13 04 55 31.3200 -97.3300 251.000 457.0 186.600 4.060 -999.990 -999.990 1.866 ..P WKT 2010 05 29 13 09 55 31.3200 -97.3300 251.000 30.0 154.095 3.470 -999.990 -999.990 1.541 ..P WKT 2010 05 29 13 14 55 31.3200 -97.3300 251.000 122.0 158.325 3.360 -999.990 -999.990 1.583 ..P WKT 2010 05 29 13 19 55 31.3200 -97.3300 251.000 457.0 173.209 3.710 -999.990 -999.990 1.732 ..P WKT 2010 05 29 13 29 55 31.3200 -97.3300 251.000 30.0 158.294 3.850 -999.990 -999.990 1.583 ..P WKT 2010 05 29 13 34 55 31.3200 -97.3300 251.000 122.0 150.086 3.570 -999.990 -999.990 1.501 ..P WKT 2010 05 29 13 39 55 31.3200 -97.3300 251.000 457.0 149.728 3.640 -999.990 -999.990 1.497 ..P WKT 2010 05 29 13 44 55 31.3200 -97.3300 251.000 30.0 166.474 4.300 -999.990 -999.990 1.665 ..P WKT 2010 05 29 13 49 55 31.3200 -97.3300 251.000 122.0 157.285 3.960 -999.990 -999.990 1.573 ..P WKT 2010 05 29 13 54 55 31.3200 -97.3300 251.000 457.0 172.488 3.460 -999.990 -999.990 1.725 ..P WKT 2010 05 29 14 04 55 31.3200 -97.3300 251.000 30.0 189.755 3.570 -999.990 -999.990 1.898 ..P WKT 2010 05 29 14 09 55 31.3200 -97.3300 251.000 122.0 167.150 5.560 -999.990 -999.990 1.671 ..P WKT 2010 05 29 14 14 55 31.3200 -97.3300 251.000 457.0 163.048 4.450 -999.990 -999.990 1.630 ..P WKT 2010 05 29 14 19 55 31.3200 -97.3300 251.000 30.0 198.894 5.850 -999.990 -999.990 1.989 ..P WKT 2010 05 29 14 24 55 31.3200 -97.3300 251.000 122.0 194.792 4.960 -999.990 -999.990 1.948 ..P WKT 2010 05 29 14 29 55 31.3200 -97.3300 251.000 457.0 161.955 3.590 -999.990 -999.990 1.620 ..P WKT 2010 05 29 14 39 55 31.3200 -97.3300 251.000 30.0 174.976 5.630 -999.990 -999.990 1.750 ..P WKT 2010 05 29 14 44 55 31.3200 -97.3300 251.000 122.0 192.940 4.450 -999.990 -999.990 1.929 ..P WKT 2010 05 29 14 49 55 31.3200 -97.3300 251.000 457.0 164.230 4.430 -999.990 -999.990 1.642 ..P WKT 2010 05 29 14 54 55 31.3200 -97.3300 251.000 30.0 189.061 4.520 -999.990 -999.990 1.891 ..P WKT 2010 05 29 14 59 55 31.3200 -97.3300 251.000 122.0 185.580 4.700 -999.990 -999.990 1.856 ..P WKT 2010 05 29 15 04 55 31.3200 -97.3300 251.000 457.0 167.243 5.110 -999.990 -999.990 1.672 ..P WKT 2010 05 29 15 14 55 31.3200 -97.3300 251.000 30.0 173.415 4.680 -999.990 -999.990 1.734 ..P WKT 2010 05 29 15 19 55 31.3200 -97.3300 251.000 122.0 182.927 5.240 -999.990 -999.990 1.829 ..P WKT 2010 05 29 15 24 55 31.3200 -97.3300 251.000 457.0 166.093 3.960 -999.990 -999.990 1.661 ..P WKT 2010 05 29 15 29 55 31.3200 -97.3300 251.000 30.0 180.090 4.150 -999.990 -999.990 1.801 ..P WKT 2010 05 29 15 34 55 31.3200 -97.3300 251.000 122.0 194.787 4.530 -999.990 -999.990 1.948 ..P WKT 2010 05 29 15 39 55 31.3200 -97.3300 251.000 457.0 172.208 4.310 -999.990 -999.990 1.722 ..P WKT 2010 05 29 15 49 55 31.3200 -97.3300 251.000 30.0 178.699 3.460 -999.990 -999.990 1.787 ..P WKT 2010 05 29 15 54 55 31.3200 -97.3300 251.000 122.0 187.730 3.760 -999.990 -999.990 1.877 ..P WKT 2010 05 29 15 59 55 31.3200 -97.3300 251.000 457.0 177.424 4.230 -999.990 -999.990 1.774 ..P WKT 2010 05 29 16 04 55 31.3200 -97.3300 251.000 30.0 178.887 3.590 -999.990 -999.990 1.789 ..P WKT 2010 05 29 16 09 55 31.3200 -97.3300 251.000 122.0 186.237 4.280 -999.990 -999.990 1.862 ..P WKT 2010 05 29 16 14 55 31.3200 -97.3300 251.000 457.0 178.172 4.700 -999.990 -999.990 1.782 ..P WKT 2010 05 29 16 24 55 31.3200 -97.3300 251.000 30.0 175.535 3.900 -999.990 -999.990 1.755 ..P WKT 2010 05 29 16 29 55 31.3200 -97.3300 251.000 122.0 186.007 4.290 -999.990 -999.990 1.860 ..P WKT 2010 05 29 16 34 55 31.3200 -97.3300 251.000 457.0 174.901 4.330 -999.990 -999.990 1.749 ..P WKT 2010 05 29 16 39 55 31.3200 -97.3300 251.000 30.0 183.410 4.210 -999.990 -999.990 1.834 ..P WKT 2010 05 29 16 44 55 31.3200 -97.3300 251.000 122.0 180.991 4.320 -999.990 -999.990 1.810 ..P WKT 2010 05 29 16 49 55 31.3200 -97.3300 251.000 457.0 180.814 4.230 -999.990 -999.990 1.808 ..P WKT 2010 05 29 17 04 55 31.3200 -97.3300 251.000 30.0 176.119 4.960 -999.990 -999.990 1.761 ..P WKT 2010 05 29 17 09 55 31.3200 -97.3300 251.000 122.0 179.043 4.040 -999.990 -999.990 1.790 ..P WKT 2010 05 29 17 14 55 31.3200 -97.3300 251.000 457.0 176.645 4.180 -999.990 -999.990 1.766 ..P WKT 2010 05 29 17 19 55 31.3200 -97.3300 251.000 30.0 179.850 4.180 -999.990 -999.990 1.798 ..P WKT 2010 05 29 17 24 55 31.3200 -97.3300 251.000 122.0 185.015 4.070 -999.990 -999.990 1.850 ..P WKT 2010 05 29 17 29 55 31.3200 -97.3300 251.000 457.0 166.927 4.650 -999.990 -999.990 1.669 ..P WKT 2010 05 29 17 39 55 31.3200 -97.3300 251.000 30.0 174.117 4.070 -999.990 -999.990 1.741 ..P WKT 2010 05 29 17 44 55 31.3200 -97.3300 251.000 122.0 185.666 4.150 -999.990 -999.990 1.857 ..P WKT 2010 05 29 17 49 55 31.3200 -97.3300 251.000 457.0 171.861 4.290 -999.990 -999.990 1.719 ..P WKT 2010 05 29 17 54 55 31.3200 -97.3300 251.000 30.0 173.464 4.810 -999.990 -999.990 1.735 ..P WKT 2010 05 29 17 59 55 31.3200 -97.3300 251.000 122.0 183.053 6.210 -999.990 -999.990 1.831 ..P WKT 2010 05 29 18 04 55 31.3200 -97.3300 251.000 457.0 167.988 5.600 -999.990 -999.990 1.680 ..P WKT 2010 05 29 18 14 55 31.3200 -97.3300 251.000 30.0 167.653 5.570 -999.990 -999.990 1.677 ..P WKT 2010 05 29 18 19 55 31.3200 -97.3300 251.000 122.0 172.298 5.310 -999.990 -999.990 1.723 ..P WKT 2010 05 29 18 24 55 31.3200 -97.3300 251.000 457.0 159.855 5.350 -999.990 -999.990 1.599 ..P WKT 2010 05 29 18 29 55 31.3200 -97.3300 251.000 30.0 160.439 5.210 -999.990 -999.990 1.604 ..P WKT 2010 05 29 18 34 55 31.3200 -97.3300 251.000 122.0 167.324 5.370 -999.990 -999.990 1.673 ..P WKT 2010 05 29 18 39 55 31.3200 -97.3300 251.000 457.0 165.807 5.160 -999.990 -999.990 1.658 ..P WKT 2010 05 29 18 49 55 31.3200 -97.3300 251.000 30.0 164.493 4.460 -999.990 -999.990 1.645 ..P WKT 2010 05 29 18 54 55 31.3200 -97.3300 251.000 122.0 177.299 5.320 -999.990 -999.990 1.773 ..P WKT 2010 05 29 18 59 55 31.3200 -97.3300 251.000 457.0 164.198 5.160 -999.990 -999.990 1.642 ..P WKT 2010 05 29 19 04 55 31.3200 -97.3300 251.000 30.0 159.359 5.050 -999.990 -999.990 1.594 ..P WKT 2010 05 29 19 09 55 31.3200 -97.3300 251.000 122.0 166.004 5.150 -999.990 -999.990 1.660 ..P WKT 2010 05 29 19 14 55 31.3200 -97.3300 251.000 457.0 159.346 5.490 -999.990 -999.990 1.593 ..P WKT 2010 05 29 19 24 55 31.3200 -97.3300 251.000 30.0 161.632 5.740 -999.990 -999.990 1.616 ..P WKT 2010 05 29 19 29 55 31.3200 -97.3300 251.000 122.0 168.757 5.670 -999.990 -999.990 1.688 ..P WKT 2010 05 29 19 34 55 31.3200 -97.3300 251.000 457.0 163.559 5.690 -999.990 -999.990 1.636 ..P WKT 2010 05 29 19 39 55 31.3200 -97.3300 251.000 30.0 159.761 5.540 -999.990 -999.990 1.598 ..P WKT 2010 05 29 19 44 55 31.3200 -97.3300 251.000 122.0 167.445 5.520 -999.990 -999.990 1.674 ..P WKT 2010 05 29 19 49 55 31.3200 -97.3300 251.000 457.0 158.887 5.690 -999.990 -999.990 1.589 ..P WKT 2010 05 29 19 59 55 31.3200 -97.3300 251.000 30.0 162.914 5.270 -999.990 -999.990 1.629 ..P WKT 2010 05 29 20 04 55 31.3200 -97.3300 251.000 122.0 163.176 5.220 -999.990 -999.990 1.632 ..P WKT 2010 05 29 20 09 55 31.3200 -97.3300 251.000 457.0 154.759 4.850 -999.990 -999.990 1.548 ..P WKT 2010 05 29 20 14 55 31.3200 -97.3300 251.000 30.0 161.743 5.820 -999.990 -999.990 1.617 ..P WKT 2010 05 29 20 19 55 31.3200 -97.3300 251.000 122.0 169.005 4.300 -999.990 -999.990 1.690 ..P WKT 2010 05 29 20 24 55 31.3200 -97.3300 251.000 457.0 154.989 4.950 -999.990 -999.990 1.550 ..P WKT 2010 05 29 20 34 55 31.3200 -97.3300 251.000 30.0 158.794 5.000 -999.990 -999.990 1.588 ..P WKT 2010 05 29 20 39 55 31.3200 -97.3300 251.000 122.0 166.538 5.100 -999.990 -999.990 1.665 ..P WKT 2010 05 29 20 44 55 31.3200 -97.3300 251.000 457.0 159.441 4.550 -999.990 -999.990 1.594 ..P WKT 2010 05 29 20 49 55 31.3200 -97.3300 251.000 30.0 155.704 4.500 -999.990 -999.990 1.557 ..P WKT 2010 05 29 20 54 55 31.3200 -97.3300 251.000 122.0 167.646 4.670 -999.990 -999.990 1.676 ..P WKT 2010 05 29 20 59 55 31.3200 -97.3300 251.000 457.0 160.270 5.020 -999.990 -999.990 1.603 ..P WKT 2010 05 29 21 09 55 31.3200 -97.3300 251.000 30.0 162.476 5.280 -999.990 -999.990 1.625 ..P WKT 2010 05 29 21 14 55 31.3200 -97.3300 251.000 122.0 168.138 5.110 -999.990 -999.990 1.681 ..P WKT 2010 05 29 21 19 55 31.3200 -97.3300 251.000 457.0 157.843 5.330 -999.990 -999.990 1.578 ..P WKT 2010 05 29 21 24 55 31.3200 -97.3300 251.000 30.0 155.106 6.160 -999.990 -999.990 1.551 ..P WKT 2010 05 29 21 29 55 31.3200 -97.3300 251.000 122.0 165.667 5.800 -999.990 -999.990 1.657 ..P WKT 2010 05 29 21 34 55 31.3200 -97.3300 251.000 457.0 163.071 4.970 -999.990 -999.990 1.631 ..P WKT 2010 05 29 21 44 55 31.3200 -97.3300 251.000 30.0 171.874 5.450 -999.990 -999.990 1.719 ..P WKT 2010 05 29 21 49 55 31.3200 -97.3300 251.000 122.0 163.680 5.650 -999.990 -999.990 1.637 ..P WKT 2010 05 29 21 54 55 31.3200 -97.3300 251.000 457.0 160.103 6.370 -999.990 -999.990 1.601 ..P WKT 2010 05 29 21 59 55 31.3200 -97.3300 251.000 30.0 157.927 5.570 -999.990 -999.990 1.579 ..P WKT 2010 05 29 22 04 55 31.3200 -97.3300 251.000 122.0 165.128 5.600 -999.990 -999.990 1.651 ..P WKT 2010 05 29 22 09 55 31.3200 -97.3300 251.000 457.0 155.954 4.940 -999.990 -999.990 1.560 ..P WKT 2010 05 29 22 19 55 31.3200 -97.3300 251.000 30.0 162.577 4.820 -999.990 -999.990 1.626 ..P WKT 2010 05 29 22 24 55 31.3200 -97.3300 251.000 122.0 166.479 5.340 -999.990 -999.990 1.665 ..P WKT 2010 05 29 22 29 55 31.3200 -97.3300 251.000 457.0 160.305 4.730 -999.990 -999.990 1.603 ..P WKT 2010 05 29 22 34 55 31.3200 -97.3300 251.000 30.0 155.250 4.760 -999.990 -999.990 1.552 ..P WKT 2010 05 29 22 39 55 31.3200 -97.3300 251.000 122.0 161.530 5.070 -999.990 -999.990 1.615 ..P WKT 2010 05 29 22 44 55 31.3200 -97.3300 251.000 457.0 152.698 5.340 -999.990 -999.990 1.527 ..P WKT 2010 05 29 22 54 55 31.3200 -97.3300 251.000 30.0 153.223 6.100 -999.990 -999.990 1.532 ..P WKT 2010 05 29 22 59 55 31.3200 -97.3300 251.000 122.0 166.779 5.030 -999.990 -999.990 1.668 ..P WKT 2010 05 29 23 04 55 31.3200 -97.3300 251.000 457.0 158.087 5.590 -999.990 -999.990 1.581 ..P WKT 2010 05 29 23 09 55 31.3200 -97.3300 251.000 30.0 157.930 4.590 -999.990 -999.990 1.579 ..P WKT 2010 05 29 23 14 55 31.3200 -97.3300 251.000 122.0 162.810 5.130 -999.990 -999.990 1.628 ..P WKT 2010 05 29 23 19 55 31.3200 -97.3300 251.000 457.0 154.398 4.690 -999.990 -999.990 1.544 ..P WKT 2010 05 29 23 29 55 31.3200 -97.3300 251.000 30.0 158.072 4.580 -999.990 -999.990 1.581 ..P WKT 2010 05 29 23 34 55 31.3200 -97.3300 251.000 122.0 167.079 5.200 -999.990 -999.990 1.671 ..P WKT 2010 05 29 23 39 55 31.3200 -97.3300 251.000 457.0 155.660 5.100 -999.990 -999.990 1.557 ..P WKT 2010 05 29 23 44 55 31.3200 -97.3300 251.000 30.0 162.428 4.760 -999.990 -999.990 1.624 ..P WKT 2010 05 29 23 49 55 31.3200 -97.3300 251.000 122.0 162.761 5.020 -999.990 -999.990 1.628 ..P WKT 2010 05 30 00 09 55 31.3200 -97.3300 251.000 457.0 162.329 5.100 -999.990 -999.990 1.623 ..P WKT 2010 05 30 00 10 25 31.3200 -97.3300 251.000 457.0 159.775 5.050 -999.990 -999.990 1.598 ..P WKT 2010 05 30 00 10 55 31.3200 -97.3300 251.000 457.0 155.263 4.970 -999.990 -999.990 1.553 ..P WKT 2010 05 30 00 11 25 31.3200 -97.3300 251.000 457.0 157.185 4.890 -999.990 -999.990 1.572 ..P WKT 2010 05 30 00 11 55 31.3200 -97.3300 251.000 457.0 154.911 4.830 -999.990 -999.990 1.549 ..P WKT 2010 05 30 00 12 25 31.3200 -97.3300 251.000 457.0 159.351 4.930 -999.990 -999.990 1.594 ..P WKT 2010 05 30 00 12 55 31.3200 -97.3300 251.000 457.0 158.196 5.210 -999.990 -999.990 1.582 ..P WKT 2010 05 30 00 13 25 31.3200 -97.3300 251.000 457.0 155.082 5.190 -999.990 -999.990 1.551 ..P WKT 2010 05 30 00 13 55 31.3200 -97.3300 251.000 457.0 154.207 5.090 -999.990 -999.990 1.542 ..P WKT 2010 05 30 00 14 25 31.3200 -97.3300 251.000 457.0 158.927 5.520 -999.990 -999.990 1.589 ..P WKT 2010 05 30 00 14 55 31.3200 -97.3300 251.000 457.0 157.492 4.910 -999.990 -999.990 1.575 ..P WKT 2010 05 30 00 19 55 31.3200 -97.3300 251.000 30.0 157.130 5.170 -999.990 -999.990 1.571 ..P WKT 2010 05 30 00 24 55 31.3200 -97.3300 251.000 122.0 163.202 4.860 -999.990 -999.990 1.632 ..P WKT 2010 05 30 00 29 55 31.3200 -97.3300 251.000 457.0 155.567 4.900 -999.990 -999.990 1.556 ..P WKT 2010 05 30 00 34 55 31.3200 -97.3300 251.000 30.0 162.758 4.760 -999.990 -999.990 1.628 ..P WKT 2010 05 30 00 39 55 31.3200 -97.3300 251.000 122.0 164.354 5.140 -999.990 -999.990 1.644 ..P WKT 2010 05 30 00 44 55 31.3200 -97.3300 251.000 457.0 157.838 5.270 -999.990 -999.990 1.578 ..P WKT 2010 05 30 00 54 55 31.3200 -97.3300 251.000 30.0 166.238 4.940 -999.990 -999.990 1.662 ..P WKT 2010 05 30 00 59 55 31.3200 -97.3300 251.000 122.0 159.337 4.780 -999.990 -999.990 1.593 ..P WKT 2010 05 30 01 04 55 31.3200 -97.3300 251.000 457.0 162.224 5.700 -999.990 -999.990 1.622 ..P WKT 2010 05 30 01 09 55 31.3200 -97.3300 251.000 30.0 170.146 5.160 -999.990 -999.990 1.701 ..P WKT 2010 05 30 01 14 55 31.3200 -97.3300 251.000 122.0 161.288 4.590 -999.990 -999.990 1.613 ..P WKT 2010 05 30 01 19 55 31.3200 -97.3300 251.000 457.0 158.582 4.550 -999.990 -999.990 1.586 ..P WKT 2010 05 30 01 29 55 31.3200 -97.3300 251.000 30.0 165.275 4.990 -999.990 -999.990 1.653 ..P WKT 2010 05 30 01 34 55 31.3200 -97.3300 251.000 122.0 167.404 4.660 -999.990 -999.990 1.674 ..P WKT 2010 05 30 01 39 55 31.3200 -97.3300 251.000 457.0 161.842 5.610 -999.990 -999.990 1.618 ..P WKT 2010 05 30 01 44 55 31.3200 -97.3300 251.000 30.0 180.469 6.180 -999.990 -999.990 1.805 ..P WKT 2010 05 30 01 49 55 31.3200 -97.3300 251.000 122.0 163.442 6.030 -999.990 -999.990 1.634 ..P WKT 2010 05 30 01 54 55 31.3200 -97.3300 251.000 457.0 155.364 4.520 -999.990 -999.990 1.554 ..P WKT 2010 05 30 02 04 55 31.3200 -97.3300 251.000 30.0 180.033 4.670 -999.990 -999.990 1.800 ..P WKT 2010 05 30 02 09 55 31.3200 -97.3300 251.000 122.0 162.867 4.930 -999.990 -999.990 1.629 ..P WKT 2010 05 30 02 14 55 31.3200 -97.3300 251.000 457.0 164.296 5.060 -999.990 -999.990 1.643 ..P WKT 2010 05 30 02 19 55 31.3200 -97.3300 251.000 30.0 175.231 4.940 -999.990 -999.990 1.752 ..P WKT 2010 05 30 02 24 55 31.3200 -97.3300 251.000 122.0 171.767 4.570 -999.990 -999.990 1.718 ..P WKT 2010 05 30 02 29 55 31.3200 -97.3300 251.000 457.0 168.722 4.750 -999.990 -999.990 1.687 ..P WKT 2010 05 30 02 39 55 31.3200 -97.3300 251.000 30.0 187.075 4.600 -999.990 -999.990 1.871 ..P WKT 2010 05 30 02 44 55 31.3200 -97.3300 251.000 122.0 174.226 4.500 -999.990 -999.990 1.742 ..P WKT 2010 05 30 02 49 55 31.3200 -97.3300 251.000 457.0 161.237 4.290 -999.990 -999.990 1.612 ..P WKT 2010 05 30 02 54 55 31.3200 -97.3300 251.000 30.0 172.151 5.120 -999.990 -999.990 1.722 ..P WKT 2010 05 30 02 59 55 31.3200 -97.3300 251.000 122.0 174.118 4.430 -999.990 -999.990 1.741 ..P WKT 2010 05 30 03 04 55 31.3200 -97.3300 251.000 457.0 163.786 4.470 -999.990 -999.990 1.638 ..P WKT 2010 05 30 03 14 55 31.3200 -97.3300 251.000 30.0 174.850 4.520 -999.990 -999.990 1.748 ..P WKT 2010 05 30 03 19 55 31.3200 -97.3300 251.000 122.0 174.301 4.400 -999.990 -999.990 1.743 ..P WKT 2010 05 30 03 24 55 31.3200 -97.3300 251.000 457.0 161.174 4.750 -999.990 -999.990 1.612 ..P WKT 2010 05 30 03 29 55 31.3200 -97.3300 251.000 30.0 176.139 4.640 -999.990 -999.990 1.761 ..P WKT 2010 05 30 03 34 55 31.3200 -97.3300 251.000 122.0 168.464 4.390 -999.990 -999.990 1.685 ..P WKT 2010 05 30 03 39 55 31.3200 -97.3300 251.000 457.0 162.465 4.690 -999.990 -999.990 1.625 ..P WKT 2010 05 30 03 49 55 31.3200 -97.3300 251.000 30.0 172.049 5.070 -999.990 -999.990 1.720 ..P WKT 2010 05 30 03 54 55 31.3200 -97.3300 251.000 122.0 167.230 5.090 -999.990 -999.990 1.672 ..P WKT 2010 05 30 03 59 55 31.3200 -97.3300 251.000 457.0 166.043 4.530 -999.990 -999.990 1.660 ..P WKT 2010 05 30 04 04 55 31.3200 -97.3300 251.000 30.0 174.917 4.730 -999.990 -999.990 1.749 ..P WKT 2010 05 30 04 09 55 31.3200 -97.3300 251.000 122.0 175.407 4.900 -999.990 -999.990 1.754 ..P WKT 2010 05 30 04 14 55 31.3200 -97.3300 251.000 457.0 171.146 4.600 -999.990 -999.990 1.711 ..P WKT 2010 05 30 04 24 55 31.3200 -97.3300 251.000 30.0 172.166 4.730 -999.990 -999.990 1.722 ..P WKT 2010 05 30 04 29 55 31.3200 -97.3300 251.000 122.0 183.034 4.560 -999.990 -999.990 1.830 ..P WKT 2010 05 30 04 34 55 31.3200 -97.3300 251.000 457.0 173.784 4.660 -999.990 -999.990 1.738 ..P WKT 2010 05 30 04 39 55 31.3200 -97.3300 251.000 30.0 179.063 4.750 -999.990 -999.990 1.791 ..P WKT 2010 05 30 04 44 55 31.3200 -97.3300 251.000 122.0 179.593 4.400 -999.990 -999.990 1.796 ..P WKT 2010 05 30 04 49 55 31.3200 -97.3300 251.000 457.0 176.490 4.380 -999.990 -999.990 1.765 ..P WKT 2010 05 30 05 04 55 31.3200 -97.3300 251.000 30.0 173.374 4.320 -999.990 -999.990 1.734 ..P WKT 2010 05 30 05 09 55 31.3200 -97.3300 251.000 122.0 177.419 4.420 -999.990 -999.990 1.774 ..P WKT 2010 05 30 05 14 55 31.3200 -97.3300 251.000 457.0 173.360 4.550 -999.990 -999.990 1.734 ..P WKT 2010 05 30 05 19 55 31.3200 -97.3300 251.000 30.0 169.024 4.350 -999.990 -999.990 1.690 ..P WKT 2010 05 30 05 24 55 31.3200 -97.3300 251.000 122.0 176.280 4.940 -999.990 -999.990 1.763 ..P WKT 2010 05 30 05 29 55 31.3200 -97.3300 251.000 457.0 172.083 4.460 -999.990 -999.990 1.721 ..P WKT 2010 05 30 05 39 55 31.3200 -97.3300 251.000 30.0 170.850 4.280 -999.990 -999.990 1.708 ..P WKT 2010 05 30 05 44 55 31.3200 -97.3300 251.000 122.0 173.954 4.780 -999.990 -999.990 1.740 ..P WKT 2010 05 30 05 49 55 31.3200 -97.3300 251.000 457.0 170.492 4.210 -999.990 -999.990 1.705 ..P WKT 2010 05 30 05 54 55 31.3200 -97.3300 251.000 30.0 163.680 5.020 -999.990 -999.990 1.637 ..P WKT 2010 05 30 05 59 55 31.3200 -97.3300 251.000 122.0 172.509 4.200 -999.990 -999.990 1.725 ..P WKT 2010 05 30 06 04 55 31.3200 -97.3300 251.000 457.0 167.652 4.230 -999.990 -999.990 1.677 ..P WKT 2010 05 30 06 14 55 31.3200 -97.3300 251.000 30.0 163.405 4.260 -999.990 -999.990 1.634 ..P WKT 2010 05 30 06 19 55 31.3200 -97.3300 251.000 122.0 160.384 4.660 -999.990 -999.990 1.604 ..P WKT 2010 05 30 06 24 55 31.3200 -97.3300 251.000 457.0 162.110 4.180 -999.990 -999.990 1.621 ..P WKT 2010 05 30 06 29 55 31.3200 -97.3300 251.000 30.0 160.904 4.200 -999.990 -999.990 1.609 ..P WKT 2010 05 30 06 34 55 31.3200 -97.3300 251.000 122.0 168.635 4.460 -999.990 -999.990 1.686 ..P WKT 2010 05 30 06 39 55 31.3200 -97.3300 251.000 457.0 170.361 4.470 -999.990 -999.990 1.704 ..P WKT 2010 05 30 06 49 55 31.3200 -97.3300 251.000 30.0 163.601 4.400 -999.990 -999.990 1.636 ..P WKT 2010 05 30 06 54 55 31.3200 -97.3300 251.000 122.0 172.847 4.540 -999.990 -999.990 1.728 ..P WKT 2010 05 30 06 59 55 31.3200 -97.3300 251.000 457.0 173.436 4.060 -999.990 -999.990 1.734 ..P WKT 2010 05 30 07 04 55 31.3200 -97.3300 251.000 30.0 145.964 4.130 -999.990 -999.990 1.460 ..P WKT 2010 05 30 07 09 55 31.3200 -97.3300 251.000 122.0 178.244 4.230 -999.990 -999.990 1.782 ..P WKT 2010 05 30 07 14 55 31.3200 -97.3300 251.000 457.0 173.667 4.940 -999.990 -999.990 1.737 ..P WKT 2010 05 30 07 24 55 31.3200 -97.3300 251.000 30.0 152.211 4.370 -999.990 -999.990 1.522 ..P WKT 2010 05 30 07 29 55 31.3200 -97.3300 251.000 122.0 144.126 4.090 -999.990 -999.990 1.441 ..P WKT 2010 05 30 07 34 55 31.3200 -97.3300 251.000 457.0 175.963 3.990 -999.990 -999.990 1.760 ..P WKT 2010 05 30 07 39 55 31.3200 -97.3300 251.000 30.0 152.803 3.990 -999.990 -999.990 1.528 ..P WKT 2010 05 30 07 44 55 31.3200 -97.3300 251.000 122.0 151.139 5.130 -999.990 -999.990 1.511 ..P WKT 2010 05 30 07 49 55 31.3200 -97.3300 251.000 457.0 175.995 4.160 -999.990 -999.990 1.760 ..P WKT 2010 05 30 07 59 55 31.3200 -97.3300 251.000 30.0 147.864 4.440 -999.990 -999.990 1.479 ..P WKT 2010 05 30 08 04 55 31.3200 -97.3300 251.000 122.0 169.966 4.010 -999.990 -999.990 1.700 ..P WKT 2010 05 30 08 09 55 31.3200 -97.3300 251.000 457.0 169.179 4.020 -999.990 -999.990 1.692 ..P WKT 2010 05 30 08 14 55 31.3200 -97.3300 251.000 30.0 171.742 5.600 -999.990 -999.990 1.717 ..P WKT 2010 05 30 08 19 55 31.3200 -97.3300 251.000 122.0 159.791 4.220 -999.990 -999.990 1.598 ..P WKT 2010 05 30 08 24 55 31.3200 -97.3300 251.000 457.0 181.054 4.230 -999.990 -999.990 1.811 ..P WKT 2010 05 30 08 34 55 31.3200 -97.3300 251.000 30.0 170.948 3.810 -999.990 -999.990 1.709 ..P WKT 2010 05 30 08 39 55 31.3200 -97.3300 251.000 122.0 168.885 4.420 -999.990 -999.990 1.689 ..P WKT 2010 05 30 08 44 55 31.3200 -97.3300 251.000 457.0 167.381 4.000 -999.990 -999.990 1.674 ..P WKT 2010 05 30 08 49 55 31.3200 -97.3300 251.000 30.0 159.459 3.760 -999.990 -999.990 1.595 ..P WKT 2010 05 30 08 54 55 31.3200 -97.3300 251.000 122.0 176.373 3.750 -999.990 -999.990 1.764 ..P WKT 2010 05 30 08 59 55 31.3200 -97.3300 251.000 457.0 176.264 5.230 -999.990 -999.990 1.763 ..P WKT 2010 05 30 09 09 55 31.3200 -97.3300 251.000 30.0 160.699 5.390 -999.990 -999.990 1.607 ..P WKT 2010 05 30 09 14 55 31.3200 -97.3300 251.000 122.0 172.589 3.640 -999.990 -999.990 1.726 ..P WKT 2010 05 30 09 19 55 31.3200 -97.3300 251.000 457.0 178.061 4.490 -999.990 -999.990 1.781 ..P WKT 2010 05 30 09 24 55 31.3200 -97.3300 251.000 30.0 161.628 3.940 -999.990 -999.990 1.616 ..P WKT 2010 05 30 09 29 55 31.3200 -97.3300 251.000 122.0 179.517 3.970 -999.990 -999.990 1.795 ..P WKT 2010 05 30 09 34 55 31.3200 -97.3300 251.000 457.0 179.128 4.070 -999.990 -999.990 1.791 ..P WKT 2010 05 30 09 44 55 31.3200 -97.3300 251.000 30.0 176.838 4.990 -999.990 -999.990 1.768 ..P WKT 2010 05 30 09 49 55 31.3200 -97.3300 251.000 122.0 178.283 3.690 -999.990 -999.990 1.783 ..P WKT 2010 05 30 09 54 55 31.3200 -97.3300 251.000 457.0 161.595 3.920 -999.990 -999.990 1.616 ..P WKT 2010 05 30 09 59 55 31.3200 -97.3300 251.000 30.0 176.152 4.430 -999.990 -999.990 1.762 ..P WKT 2010 05 30 10 04 55 31.3200 -97.3300 251.000 122.0 183.595 4.170 -999.990 -999.990 1.836 ..P WKT 2010 05 30 10 09 55 31.3200 -97.3300 251.000 457.0 162.444 4.100 -999.990 -999.990 1.624 ..P WKT 2010 05 30 10 19 55 31.3200 -97.3300 251.000 30.0 181.076 4.000 -999.990 -999.990 1.811 ..P WKT 2010 05 30 10 24 55 31.3200 -97.3300 251.000 122.0 180.549 4.570 -999.990 -999.990 1.805 ..P WKT 2010 05 30 10 29 55 31.3200 -97.3300 251.000 457.0 163.983 3.980 -999.990 -999.990 1.640 ..P WKT 2010 05 30 10 34 55 31.3200 -97.3300 251.000 30.0 187.443 4.070 -999.990 -999.990 1.874 ..P WKT 2010 05 30 10 39 55 31.3200 -97.3300 251.000 122.0 184.684 4.240 -999.990 -999.990 1.847 ..P WKT 2010 05 30 10 44 55 31.3200 -97.3300 251.000 457.0 159.613 3.520 -999.990 -999.990 1.596 ..P WKT 2010 05 30 10 54 55 31.3200 -97.3300 251.000 30.0 188.421 3.960 -999.990 -999.990 1.884 ..P WKT 2010 05 30 10 59 55 31.3200 -97.3300 251.000 122.0 187.077 3.640 -999.990 -999.990 1.871 ..P WKT 2010 05 30 11 04 55 31.3200 -97.3300 251.000 457.0 157.147 7.200 -999.990 -999.990 1.571 ..P WKT 2010 05 30 11 09 55 31.3200 -97.3300 251.000 30.0 186.898 4.790 -999.990 -999.990 1.869 ..P WKT 2010 05 30 11 14 55 31.3200 -97.3300 251.000 122.0 186.669 4.370 -999.990 -999.990 1.867 ..P WKT 2010 05 30 11 19 55 31.3200 -97.3300 251.000 457.0 160.646 3.670 -999.990 -999.990 1.606 ..P WKT 2010 05 30 11 29 55 31.3200 -97.3300 251.000 30.0 197.864 3.180 -999.990 -999.990 1.979 ..P WKT 2010 05 30 11 34 55 31.3200 -97.3300 251.000 122.0 192.227 4.230 -999.990 -999.990 1.922 ..P WKT 2010 05 30 11 39 55 31.3200 -97.3300 251.000 457.0 158.708 4.220 -999.990 -999.990 1.587 ..P WKT 2010 05 30 11 44 55 31.3200 -97.3300 251.000 30.0 200.751 4.260 -999.990 -999.990 2.008 ..P WKT 2010 05 30 11 49 55 31.3200 -97.3300 251.000 122.0 195.952 3.680 -999.990 -999.990 1.960 ..P WKT 2010 05 30 12 09 55 31.3200 -97.3300 251.000 457.0 153.342 3.670 -999.990 -999.990 1.533 ..P WKT 2010 05 30 12 10 25 31.3200 -97.3300 251.000 457.0 153.643 3.740 -999.990 -999.990 1.536 ..P WKT 2010 05 30 12 10 55 31.3200 -97.3300 251.000 457.0 153.108 3.710 -999.990 -999.990 1.531 ..P WKT 2010 05 30 12 11 25 31.3200 -97.3300 251.000 457.0 152.572 3.730 -999.990 -999.990 1.526 ..P WKT 2010 05 30 12 11 55 31.3200 -97.3300 251.000 457.0 153.152 3.710 -999.990 -999.990 1.532 ..P WKT 2010 05 30 12 12 25 31.3200 -97.3300 251.000 457.0 155.961 5.250 -999.990 -999.990 1.560 ..P WKT 2010 05 30 12 12 55 31.3200 -97.3300 251.000 457.0 158.491 4.490 -999.990 -999.990 1.585 ..P WKT 2010 05 30 12 13 25 31.3200 -97.3300 251.000 457.0 157.399 4.360 -999.990 -999.990 1.574 ..P WKT 2010 05 30 12 13 55 31.3200 -97.3300 251.000 457.0 158.814 3.940 -999.990 -999.990 1.588 ..P WKT 2010 05 30 12 14 25 31.3200 -97.3300 251.000 457.0 160.787 4.730 -999.990 -999.990 1.608 ..P WKT 2010 05 30 12 14 55 31.3200 -97.3300 251.000 457.0 157.743 4.380 -999.990 -999.990 1.577 ..P WKT 2010 05 30 12 19 55 31.3200 -97.3300 251.000 30.0 196.134 3.910 -999.990 -999.990 1.961 ..P WKT 2010 05 30 12 24 55 31.3200 -97.3300 251.000 122.0 182.420 4.570 -999.990 -999.990 1.824 ..P WKT 2010 05 30 12 29 55 31.3200 -97.3300 251.000 457.0 162.584 3.950 -999.990 -999.990 1.626 ..P WKT 2010 05 30 12 34 55 31.3200 -97.3300 251.000 30.0 193.158 4.510 -999.990 -999.990 1.932 ..P WKT 2010 05 30 12 39 55 31.3200 -97.3300 251.000 122.0 173.327 4.690 -999.990 -999.990 1.733 ..P WKT 2010 05 30 12 44 55 31.3200 -97.3300 251.000 457.0 171.596 3.740 -999.990 -999.990 1.716 ..P WKT 2010 05 30 12 54 55 31.3200 -97.3300 251.000 30.0 201.175 4.500 -999.990 -999.990 2.012 ..P WKT 2010 05 30 12 59 55 31.3200 -97.3300 251.000 122.0 172.931 3.860 -999.990 -999.990 1.729 ..P WKT 2010 05 30 13 04 55 31.3200 -97.3300 251.000 457.0 165.283 3.950 -999.990 -999.990 1.653 ..P WKT 2010 05 30 13 09 55 31.3200 -97.3300 251.000 30.0 196.577 4.170 -999.990 -999.990 1.966 ..P WKT 2010 05 30 13 14 55 31.3200 -97.3300 251.000 122.0 172.242 6.050 -999.990 -999.990 1.722 ..P WKT 2010 05 30 13 19 55 31.3200 -97.3300 251.000 457.0 163.624 3.560 -999.990 -999.990 1.636 ..P WKT 2010 05 30 13 29 55 31.3200 -97.3300 251.000 30.0 184.913 3.590 -999.990 -999.990 1.849 ..P WKT 2010 05 30 13 34 55 31.3200 -97.3300 251.000 122.0 175.901 4.590 -999.990 -999.990 1.759 ..P WKT 2010 05 30 13 39 55 31.3200 -97.3300 251.000 457.0 163.141 3.620 -999.990 -999.990 1.631 ..P WKT 2010 05 30 13 44 55 31.3200 -97.3300 251.000 30.0 192.195 5.190 -999.990 -999.990 1.922 ..P WKT 2010 05 30 13 49 55 31.3200 -97.3300 251.000 122.0 181.241 4.160 -999.990 -999.990 1.812 ..P WKT 2010 05 30 13 54 55 31.3200 -97.3300 251.000 457.0 169.182 4.150 -999.990 -999.990 1.692 ..P WKT 2010 05 30 14 04 55 31.3200 -97.3300 251.000 30.0 194.589 4.400 -999.990 -999.990 1.946 ..P WKT 2010 05 30 14 09 55 31.3200 -97.3300 251.000 122.0 185.129 4.090 -999.990 -999.990 1.851 ..P WKT 2010 05 30 14 14 55 31.3200 -97.3300 251.000 457.0 164.433 4.220 -999.990 -999.990 1.644 ..P WKT 2010 05 30 14 19 55 31.3200 -97.3300 251.000 30.0 180.372 4.470 -999.990 -999.990 1.804 ..P WKT 2010 05 30 14 24 55 31.3200 -97.3300 251.000 122.0 180.907 3.940 -999.990 -999.990 1.809 ..P WKT 2010 05 30 14 29 55 31.3200 -97.3300 251.000 457.0 157.310 3.980 -999.990 -999.990 1.573 ..P WKT 2010 05 30 14 39 55 31.3200 -97.3300 251.000 30.0 169.223 3.650 -999.990 -999.990 1.692 ..P WKT 2010 05 30 14 44 55 31.3200 -97.3300 251.000 122.0 176.295 4.210 -999.990 -999.990 1.763 ..P WKT 2010 05 30 14 49 55 31.3200 -97.3300 251.000 457.0 162.021 4.210 -999.990 -999.990 1.620 ..P WKT 2010 05 30 14 54 55 31.3200 -97.3300 251.000 30.0 167.983 3.490 -999.990 -999.990 1.680 ..P WKT 2010 05 30 14 59 55 31.3200 -97.3300 251.000 122.0 172.696 3.060 -999.990 -999.990 1.727 ..P WKT 2010 05 30 15 04 55 31.3200 -97.3300 251.000 457.0 160.507 3.240 -999.990 -999.990 1.605 ..P WKT 2010 05 30 15 14 55 31.3200 -97.3300 251.000 30.0 166.014 4.310 -999.990 -999.990 1.660 ..P WKT 2010 05 30 15 19 55 31.3200 -97.3300 251.000 122.0 175.116 3.330 -999.990 -999.990 1.751 ..P WKT 2010 05 30 15 24 55 31.3200 -97.3300 251.000 457.0 167.879 3.590 -999.990 -999.990 1.679 ..P WKT 2010 05 30 15 29 55 31.3200 -97.3300 251.000 30.0 172.825 3.400 -999.990 -999.990 1.728 ..P WKT 2010 05 30 15 34 55 31.3200 -97.3300 251.000 122.0 175.555 4.740 -999.990 -999.990 1.756 ..P WKT 2010 05 30 15 39 55 31.3200 -97.3300 251.000 457.0 168.598 3.140 -999.990 -999.990 1.686 ..P WKT 2010 05 30 15 49 55 31.3200 -97.3300 251.000 30.0 170.619 3.040 -999.990 -999.990 1.706 ..P WKT 2010 05 30 15 54 55 31.3200 -97.3300 251.000 122.0 179.590 2.850 -999.990 -999.990 1.796 ..P WKT 2010 05 30 15 59 55 31.3200 -97.3300 251.000 457.0 170.307 3.600 -999.990 -999.990 1.703 ..P WKT 2010 05 30 16 04 55 31.3200 -97.3300 251.000 30.0 172.363 5.070 -999.990 -999.990 1.724 ..P WKT 2010 05 30 16 09 55 31.3200 -97.3300 251.000 122.0 173.036 3.430 -999.990 -999.990 1.730 ..P WKT 2010 05 30 16 14 55 31.3200 -97.3300 251.000 457.0 156.297 4.240 -999.990 -999.990 1.563 ..P WKT 2010 05 30 16 24 55 31.3200 -97.3300 251.000 30.0 167.160 2.360 -999.990 -999.990 1.672 ..P WKT 2010 05 30 16 29 55 31.3200 -97.3300 251.000 122.0 175.963 3.360 -999.990 -999.990 1.760 ..P WKT 2010 05 30 16 34 55 31.3200 -97.3300 251.000 457.0 166.811 4.080 -999.990 -999.990 1.668 ..P WKT 2010 05 30 16 39 55 31.3200 -97.3300 251.000 30.0 166.221 3.730 -999.990 -999.990 1.662 ..P WKT 2010 05 30 16 44 55 31.3200 -97.3300 251.000 122.0 170.879 3.410 -999.990 -999.990 1.709 ..P WKT 2010 05 30 16 49 55 31.3200 -97.3300 251.000 457.0 170.841 3.680 -999.990 -999.990 1.708 ..P WKT 2010 05 30 17 04 55 31.3200 -97.3300 251.000 30.0 171.670 4.040 -999.990 -999.990 1.717 ..P WKT 2010 05 30 17 09 55 31.3200 -97.3300 251.000 122.0 179.827 2.660 -999.990 -999.990 1.798 ..P WKT 2010 05 30 17 14 55 31.3200 -97.3300 251.000 457.0 166.330 3.410 -999.990 -999.990 1.663 ..P WKT 2010 05 30 17 19 55 31.3200 -97.3300 251.000 30.0 168.005 2.540 -999.990 -999.990 1.680 ..P WKT 2010 05 30 17 24 55 31.3200 -97.3300 251.000 122.0 172.849 2.890 -999.990 -999.990 1.728 ..P WKT 2010 05 30 17 29 55 31.3200 -97.3300 251.000 457.0 170.938 2.030 -999.990 -999.990 1.709 ..P WKT 2010 05 30 17 39 55 31.3200 -97.3300 251.000 30.0 175.172 2.540 -999.990 -999.990 1.752 ..P WKT 2010 05 30 17 44 55 31.3200 -97.3300 251.000 122.0 176.354 2.740 -999.990 -999.990 1.764 ..P WKT 2010 05 30 17 49 55 31.3200 -97.3300 251.000 457.0 163.349 2.340 -999.990 -999.990 1.633 ..P WKT 2010 05 30 17 54 55 31.3200 -97.3300 251.000 30.0 173.897 3.500 -999.990 -999.990 1.739 ..P WKT 2010 05 30 17 59 55 31.3200 -97.3300 251.000 122.0 178.245 2.970 -999.990 -999.990 1.782 ..P WKT 2010 05 30 18 04 55 31.3200 -97.3300 251.000 457.0 167.449 2.210 -999.990 -999.990 1.674 ..P WKT 2010 05 30 18 14 55 31.3200 -97.3300 251.000 30.0 169.636 2.740 -999.990 -999.990 1.696 ..P WKT 2010 05 30 18 19 55 31.3200 -97.3300 251.000 122.0 173.394 2.760 -999.990 -999.990 1.734 ..P WKT 2010 05 30 18 24 55 31.3200 -97.3300 251.000 457.0 164.080 2.960 -999.990 -999.990 1.641 ..P WKT 2010 05 30 18 29 55 31.3200 -97.3300 251.000 30.0 162.471 3.670 -999.990 -999.990 1.625 ..P WKT 2010 05 30 18 34 55 31.3200 -97.3300 251.000 122.0 164.576 3.590 -999.990 -999.990 1.646 ..P WKT 2010 05 30 18 39 55 31.3200 -97.3300 251.000 457.0 160.907 2.370 -999.990 -999.990 1.609 ..P WKT 2010 05 30 18 49 55 31.3200 -97.3300 251.000 30.0 163.211 2.780 -999.990 -999.990 1.632 ..P WKT 2010 05 30 18 54 55 31.3200 -97.3300 251.000 122.0 165.747 3.690 -999.990 -999.990 1.657 ..P WKT 2010 05 30 18 59 55 31.3200 -97.3300 251.000 457.0 161.687 4.180 -999.990 -999.990 1.617 ..P WKT 2010 05 30 19 04 55 31.3200 -97.3300 251.000 30.0 166.008 2.930 -999.990 -999.990 1.660 ..P WKT 2010 05 30 19 09 55 31.3200 -97.3300 251.000 122.0 163.322 2.500 -999.990 -999.990 1.633 ..P WKT 2010 05 30 19 14 55 31.3200 -97.3300 251.000 457.0 158.166 2.790 -999.990 -999.990 1.582 ..P WKT 2010 05 30 19 24 55 31.3200 -97.3300 251.000 30.0 155.173 2.310 -999.990 -999.990 1.552 ..P WKT 2010 05 30 19 29 55 31.3200 -97.3300 251.000 122.0 167.767 4.350 -999.990 -999.990 1.678 ..P WKT 2010 05 30 19 34 55 31.3200 -97.3300 251.000 457.0 168.278 4.070 -999.990 -999.990 1.683 ..P WKT 2010 05 30 19 39 55 31.3200 -97.3300 251.000 30.0 159.186 4.490 -999.990 -999.990 1.592 ..P WKT 2010 05 30 19 44 55 31.3200 -97.3300 251.000 122.0 166.559 3.750 -999.990 -999.990 1.666 ..P WKT 2010 05 30 19 49 55 31.3200 -97.3300 251.000 457.0 167.345 2.870 -999.990 -999.990 1.673 ..P WKT 2010 05 30 19 59 55 31.3200 -97.3300 251.000 30.0 162.571 2.690 -999.990 -999.990 1.626 ..P WKT 2010 05 30 20 04 55 31.3200 -97.3300 251.000 122.0 176.479 4.190 -999.990 -999.990 1.765 ..P WKT 2010 05 30 20 09 55 31.3200 -97.3300 251.000 457.0 164.888 5.020 -999.990 -999.990 1.649 ..P WKT 2010 05 30 20 14 55 31.3200 -97.3300 251.000 30.0 166.732 5.460 -999.990 -999.990 1.667 ..P WKT 2010 05 30 20 19 55 31.3200 -97.3300 251.000 122.0 169.670 3.150 -999.990 -999.990 1.697 ..P WKT 2010 05 30 20 24 55 31.3200 -97.3300 251.000 457.0 152.881 2.110 -999.990 -999.990 1.529 ..P WKT 2010 05 30 20 34 55 31.3200 -97.3300 251.000 30.0 155.649 2.230 -999.990 -999.990 1.556 ..P WKT 2010 05 30 20 39 55 31.3200 -97.3300 251.000 122.0 154.656 2.460 -999.990 -999.990 1.547 ..P WKT 2010 05 30 20 44 55 31.3200 -97.3300 251.000 457.0 167.354 2.840 -999.990 -999.990 1.674 ..P WKT 2010 05 30 20 49 55 31.3200 -97.3300 251.000 30.0 152.124 3.370 -999.990 -999.990 1.521 ..P WKT 2010 05 30 20 54 55 31.3200 -97.3300 251.000 122.0 156.606 3.110 -999.990 -999.990 1.566 ..P WKT 2010 05 30 20 59 55 31.3200 -97.3300 251.000 457.0 161.360 3.250 -999.990 -999.990 1.614 ..P WKT 2010 05 30 21 09 55 31.3200 -97.3300 251.000 30.0 159.941 4.560 -999.990 -999.990 1.599 ..P WKT 2010 05 30 21 14 55 31.3200 -97.3300 251.000 122.0 163.481 3.930 -999.990 -999.990 1.635 ..P WKT 2010 05 30 21 19 55 31.3200 -97.3300 251.000 457.0 156.628 4.290 -999.990 -999.990 1.566 ..P WKT 2010 05 30 21 24 55 31.3200 -97.3300 251.000 30.0 161.671 3.580 -999.990 -999.990 1.617 ..P WKT 2010 05 30 21 29 55 31.3200 -97.3300 251.000 122.0 163.022 3.530 -999.990 -999.990 1.630 ..P WKT 2010 05 30 21 34 55 31.3200 -97.3300 251.000 457.0 162.185 3.690 -999.990 -999.990 1.622 ..P WKT 2010 05 30 21 44 55 31.3200 -97.3300 251.000 30.0 165.998 3.200 -999.990 -999.990 1.660 ..P WKT 2010 05 30 21 49 55 31.3200 -97.3300 251.000 122.0 167.230 4.170 -999.990 -999.990 1.672 ..P WKT 2010 05 30 21 54 55 31.3200 -97.3300 251.000 457.0 163.272 3.650 -999.990 -999.990 1.633 ..P WKT 2010 05 30 21 59 55 31.3200 -97.3300 251.000 30.0 160.682 2.980 -999.990 -999.990 1.607 ..P WKT 2010 05 30 22 04 55 31.3200 -97.3300 251.000 122.0 164.507 3.740 -999.990 -999.990 1.645 ..P WKT 2010 05 30 22 09 55 31.3200 -97.3300 251.000 457.0 157.277 3.210 -999.990 -999.990 1.573 ..P WKT 2010 05 30 22 19 55 31.3200 -97.3300 251.000 30.0 161.398 3.370 -999.990 -999.990 1.614 ..P WKT 2010 05 30 22 24 55 31.3200 -97.3300 251.000 122.0 166.605 3.350 -999.990 -999.990 1.666 ..P WKT 2010 05 30 22 29 55 31.3200 -97.3300 251.000 457.0 151.624 4.730 -999.990 -999.990 1.516 ..P WKT 2010 05 30 22 34 55 31.3200 -97.3300 251.000 30.0 160.785 4.530 -999.990 -999.990 1.608 ..P WKT 2010 05 30 22 39 55 31.3200 -97.3300 251.000 122.0 177.578 3.880 -999.990 -999.990 1.776 ..P WKT 2010 05 30 22 44 55 31.3200 -97.3300 251.000 457.0 162.467 3.650 -999.990 -999.990 1.625 ..P WKT 2010 05 30 22 54 55 31.3200 -97.3300 251.000 30.0 167.205 4.030 -999.990 -999.990 1.672 ..P WKT 2010 05 30 22 59 55 31.3200 -97.3300 251.000 122.0 170.691 3.930 -999.990 -999.990 1.707 ..P WKT 2010 05 30 23 04 55 31.3200 -97.3300 251.000 457.0 166.820 3.850 -999.990 -999.990 1.668 ..P WKT 2010 05 30 23 09 55 31.3200 -97.3300 251.000 30.0 161.589 4.680 -999.990 -999.990 1.616 ..P WKT 2010 05 30 23 14 55 31.3200 -97.3300 251.000 122.0 171.883 3.880 -999.990 -999.990 1.719 ..P WKT 2010 05 30 23 19 55 31.3200 -97.3300 251.000 457.0 163.657 4.500 -999.990 -999.990 1.637 ..P WKT 2010 05 30 23 29 55 31.3200 -97.3300 251.000 30.0 167.450 4.090 -999.990 -999.990 1.674 ..P WKT 2010 05 30 23 34 55 31.3200 -97.3300 251.000 122.0 175.107 4.740 -999.990 -999.990 1.751 ..P WKT 2010 05 30 23 39 55 31.3200 -97.3300 251.000 457.0 168.883 4.540 -999.990 -999.990 1.689 ..P WKT 2010 05 30 23 44 55 31.3200 -97.3300 251.000 30.0 171.640 6.780 -999.990 -999.990 1.716 ..P WKT 2010 05 30 23 49 55 31.3200 -97.3300 251.000 122.0 172.219 4.380 -999.990 -999.990 1.722 ..P WKT 2010 05 31 00 09 55 31.3200 -97.3300 251.000 457.0 171.172 3.580 -999.990 -999.990 1.712 ..P WKT 2010 05 31 00 10 25 31.3200 -97.3300 251.000 457.0 166.162 4.640 -999.990 -999.990 1.662 ..P WKT 2010 05 31 00 10 55 31.3200 -97.3300 251.000 457.0 167.680 4.020 -999.990 -999.990 1.677 ..P WKT 2010 05 31 00 11 25 31.3200 -97.3300 251.000 457.0 166.750 4.120 -999.990 -999.990 1.667 ..P WKT 2010 05 31 00 11 55 31.3200 -97.3300 251.000 457.0 167.180 4.210 -999.990 -999.990 1.672 ..P WKT 2010 05 31 00 12 25 31.3200 -97.3300 251.000 457.0 164.618 3.920 -999.990 -999.990 1.646 ..P WKT 2010 05 31 00 12 55 31.3200 -97.3300 251.000 457.0 169.400 3.580 -999.990 -999.990 1.694 ..P WKT 2010 05 31 00 13 25 31.3200 -97.3300 251.000 457.0 165.750 3.760 -999.990 -999.990 1.657 ..P WKT 2010 05 31 00 13 55 31.3200 -97.3300 251.000 457.0 167.812 3.640 -999.990 -999.990 1.678 ..P WKT 2010 05 31 00 14 25 31.3200 -97.3300 251.000 457.0 172.051 3.650 -999.990 -999.990 1.721 ..P WKT 2010 05 31 00 14 55 31.3200 -97.3300 251.000 457.0 173.841 3.580 -999.990 -999.990 1.738 ..P WKT 2010 05 31 00 19 55 31.3200 -97.3300 251.000 30.0 167.805 3.950 -999.990 -999.990 1.678 ..P WKT 2010 05 31 00 24 55 31.3200 -97.3300 251.000 122.0 173.195 4.290 -999.990 -999.990 1.732 ..P WKT 2010 05 31 00 29 55 31.3200 -97.3300 251.000 457.0 160.354 4.520 -999.990 -999.990 1.604 ..P WKT 2010 05 31 00 34 55 31.3200 -97.3300 251.000 30.0 171.732 4.140 -999.990 -999.990 1.717 ..P WKT 2010 05 31 00 39 55 31.3200 -97.3300 251.000 122.0 177.942 4.500 -999.990 -999.990 1.779 ..P WKT 2010 05 31 00 44 55 31.3200 -97.3300 251.000 457.0 165.913 3.150 -999.990 -999.990 1.659 ..P WKT 2010 05 31 00 54 55 31.3200 -97.3300 251.000 30.0 168.612 3.440 -999.990 -999.990 1.686 ..P WKT 2010 05 31 00 59 55 31.3200 -97.3300 251.000 122.0 175.449 3.960 -999.990 -999.990 1.754 ..P WKT 2010 05 31 01 04 55 31.3200 -97.3300 251.000 457.0 160.089 4.280 -999.990 -999.990 1.601 ..P WKT 2010 05 31 01 09 55 31.3200 -97.3300 251.000 30.0 171.967 4.890 -999.990 -999.990 1.720 ..P WKT 2010 05 31 01 14 55 31.3200 -97.3300 251.000 122.0 177.580 4.010 -999.990 -999.990 1.776 ..P WKT 2010 05 31 01 19 55 31.3200 -97.3300 251.000 457.0 174.340 3.250 -999.990 -999.990 1.743 ..P WKT 2010 05 31 01 29 55 31.3200 -97.3300 251.000 30.0 172.413 3.480 -999.990 -999.990 1.724 ..P WKT 2010 05 31 01 34 55 31.3200 -97.3300 251.000 122.0 176.998 4.530 -999.990 -999.990 1.770 ..P WKT 2010 05 31 01 39 55 31.3200 -97.3300 251.000 457.0 164.546 4.990 -999.990 -999.990 1.645 ..P WKT 2010 05 31 01 44 55 31.3200 -97.3300 251.000 30.0 180.172 4.880 -999.990 -999.990 1.802 ..P WKT 2010 05 31 01 49 55 31.3200 -97.3300 251.000 122.0 172.898 4.510 -999.990 -999.990 1.729 ..P WKT 2010 05 31 01 54 55 31.3200 -97.3300 251.000 457.0 161.805 5.930 -999.990 -999.990 1.618 ..P WKT 2010 05 31 02 04 55 31.3200 -97.3300 251.000 30.0 173.764 4.590 -999.990 -999.990 1.738 ..P WKT 2010 05 31 02 09 55 31.3200 -97.3300 251.000 122.0 160.134 5.870 -999.990 -999.990 1.601 ..P WKT 2010 05 31 02 14 55 31.3200 -97.3300 251.000 457.0 160.960 4.890 -999.990 -999.990 1.610 ..P WKT 2010 05 31 02 19 55 31.3200 -97.3300 251.000 30.0 166.971 5.550 -999.990 -999.990 1.670 ..P WKT 2010 05 31 02 24 55 31.3200 -97.3300 251.000 122.0 166.434 4.830 -999.990 -999.990 1.664 ..P WKT 2010 05 31 02 29 55 31.3200 -97.3300 251.000 457.0 168.763 4.320 -999.990 -999.990 1.688 ..P WKT 2010 05 31 02 39 55 31.3200 -97.3300 251.000 30.0 176.874 4.910 -999.990 -999.990 1.769 ..P WKT 2010 05 31 02 44 55 31.3200 -97.3300 251.000 122.0 173.783 4.640 -999.990 -999.990 1.738 ..P WKT 2010 05 31 02 49 55 31.3200 -97.3300 251.000 457.0 171.920 4.240 -999.990 -999.990 1.719 ..P WKT 2010 05 31 02 54 55 31.3200 -97.3300 251.000 30.0 166.233 4.000 -999.990 -999.990 1.662 ..P WKT 2010 05 31 02 59 55 31.3200 -97.3300 251.000 122.0 165.188 3.270 -999.990 -999.990 1.652 ..P WKT 2010 05 31 03 04 55 31.3200 -97.3300 251.000 457.0 176.163 3.160 -999.990 -999.990 1.762 ..P WKT 2010 05 31 03 14 55 31.3200 -97.3300 251.000 30.0 170.679 3.200 -999.990 -999.990 1.707 ..P WKT 2010 05 31 03 19 55 31.3200 -97.3300 251.000 122.0 168.697 5.600 -999.990 -999.990 1.687 ..P WKT 2010 05 31 03 24 55 31.3200 -97.3300 251.000 457.0 178.468 3.640 -999.990 -999.990 1.785 ..P WKT 2010 05 31 03 29 55 31.3200 -97.3300 251.000 30.0 164.458 3.920 -999.990 -999.990 1.645 ..P WKT 2010 05 31 03 34 55 31.3200 -97.3300 251.000 122.0 163.022 4.450 -999.990 -999.990 1.630 ..P WKT 2010 05 31 03 39 55 31.3200 -97.3300 251.000 457.0 176.350 4.560 -999.990 -999.990 1.764 ..P WKT 2010 05 31 03 49 55 31.3200 -97.3300 251.000 30.0 168.048 4.660 -999.990 -999.990 1.680 ..P WKT 2010 05 31 03 54 55 31.3200 -97.3300 251.000 122.0 165.009 4.660 -999.990 -999.990 1.650 ..P WKT 2010 05 31 03 59 55 31.3200 -97.3300 251.000 457.0 170.176 4.310 -999.990 -999.990 1.702 ..P WKT 2010 05 31 04 04 55 31.3200 -97.3300 251.000 30.0 163.853 4.620 -999.990 -999.990 1.639 ..P WKT 2010 05 31 04 09 55 31.3200 -97.3300 251.000 122.0 160.265 4.280 -999.990 -999.990 1.603 ..P WKT 2010 05 31 04 14 55 31.3200 -97.3300 251.000 457.0 154.213 5.140 -999.990 -999.990 1.542 ..P WKT 2010 05 31 04 24 55 31.3200 -97.3300 251.000 30.0 157.219 4.070 -999.990 -999.990 1.572 ..P WKT 2010 05 31 04 29 55 31.3200 -97.3300 251.000 122.0 159.163 3.740 -999.990 -999.990 1.592 ..P WKT 2010 05 31 04 34 55 31.3200 -97.3300 251.000 457.0 153.166 3.880 -999.990 -999.990 1.532 ..P WKT 2010 05 31 04 39 55 31.3200 -97.3300 251.000 30.0 171.266 3.750 -999.990 -999.990 1.713 ..P WKT 2010 05 31 04 44 55 31.3200 -97.3300 251.000 122.0 165.269 4.150 -999.990 -999.990 1.653 ..P WKT 2010 05 31 04 49 55 31.3200 -97.3300 251.000 457.0 161.189 3.640 -999.990 -999.990 1.612 ..P WKT 2010 05 31 05 04 55 31.3200 -97.3300 251.000 30.0 164.350 4.240 -999.990 -999.990 1.643 ..P WKT 2010 05 31 05 09 55 31.3200 -97.3300 251.000 122.0 151.872 3.270 -999.990 -999.990 1.519 ..P WKT 2010 05 31 05 14 55 31.3200 -97.3300 251.000 457.0 151.999 3.850 -999.990 -999.990 1.520 ..P WKT 2010 05 31 05 19 55 31.3200 -97.3300 251.000 30.0 165.147 2.880 -999.990 -999.990 1.651 ..P WKT 2010 05 31 05 24 55 31.3200 -97.3300 251.000 122.0 166.783 2.820 -999.990 -999.990 1.668 ..P WKT 2010 05 31 05 29 55 31.3200 -97.3300 251.000 457.0 155.944 2.650 -999.990 -999.990 1.559 ..P WKT 2010 05 31 05 39 55 31.3200 -97.3300 251.000 30.0 174.316 2.960 -999.990 -999.990 1.743 ..P WKT 2010 05 31 05 44 55 31.3200 -97.3300 251.000 122.0 161.024 2.980 -999.990 -999.990 1.610 ..P WKT 2010 05 31 05 49 55 31.3200 -97.3300 251.000 457.0 143.886 2.710 -999.990 -999.990 1.439 ..P WKT 2010 05 31 05 54 55 31.3200 -97.3300 251.000 30.0 166.115 2.970 -999.990 -999.990 1.661 ..P WKT 2010 05 31 05 59 55 31.3200 -97.3300 251.000 122.0 157.069 3.540 -999.990 -999.990 1.571 ..P WKT 2010 05 31 06 04 55 31.3200 -97.3300 251.000 457.0 147.197 3.020 -999.990 -999.990 1.472 ..P WKT 2010 05 31 06 14 55 31.3200 -97.3300 251.000 30.0 163.189 3.670 -999.990 -999.990 1.632 ..P WKT 2010 05 31 06 19 55 31.3200 -97.3300 251.000 122.0 161.335 3.370 -999.990 -999.990 1.613 ..P WKT 2010 05 31 06 24 55 31.3200 -97.3300 251.000 457.0 143.418 3.430 -999.990 -999.990 1.434 ..P WKT 2010 05 31 06 29 55 31.3200 -97.3300 251.000 30.0 166.961 3.100 -999.990 -999.990 1.670 ..P WKT 2010 05 31 06 34 55 31.3200 -97.3300 251.000 122.0 165.792 3.180 -999.990 -999.990 1.658 ..P WKT 2010 05 31 06 39 55 31.3200 -97.3300 251.000 457.0 151.577 2.880 -999.990 -999.990 1.516 ..P WKT 2010 05 31 06 49 55 31.3200 -97.3300 251.000 30.0 165.701 2.840 -999.990 -999.990 1.657 ..P WKT 2010 05 31 06 54 55 31.3200 -97.3300 251.000 122.0 170.144 3.700 -999.990 -999.990 1.701 ..P WKT 2010 05 31 06 59 55 31.3200 -97.3300 251.000 457.0 145.735 3.870 -999.990 -999.990 1.457 ..P WKT 2010 05 31 07 04 55 31.3200 -97.3300 251.000 30.0 160.485 4.930 -999.990 -999.990 1.605 ..P WKT 2010 05 31 07 09 55 31.3200 -97.3300 251.000 122.0 175.237 5.030 -999.990 -999.990 1.752 ..P WKT 2010 05 31 07 14 55 31.3200 -97.3300 251.000 457.0 140.511 5.760 -999.990 -999.990 1.405 ..P WKT 2010 05 31 07 24 55 31.3200 -97.3300 251.000 30.0 163.561 6.230 -999.990 -999.990 1.636 ..P WKT 2010 05 31 07 29 55 31.3200 -97.3300 251.000 122.0 172.959 6.360 -999.990 -999.990 1.730 ..P WKT 2010 05 31 07 34 55 31.3200 -97.3300 251.000 457.0 147.429 5.220 -999.990 -999.990 1.474 ..P WKT 2010 05 31 07 39 55 31.3200 -97.3300 251.000 30.0 169.205 5.130 -999.990 -999.990 1.692 ..P WKT 2010 05 31 07 44 55 31.3200 -97.3300 251.000 122.0 171.730 4.750 -999.990 -999.990 1.717 ..P WKT 2010 05 31 07 49 55 31.3200 -97.3300 251.000 457.0 150.317 4.590 -999.990 -999.990 1.503 ..P WKT 2010 05 31 07 59 55 31.3200 -97.3300 251.000 30.0 168.141 4.320 -999.990 -999.990 1.681 ..P WKT 2010 05 31 08 04 55 31.3200 -97.3300 251.000 122.0 165.279 4.380 -999.990 -999.990 1.653 ..P WKT 2010 05 31 08 09 55 31.3200 -97.3300 251.000 457.0 144.799 3.910 -999.990 -999.990 1.448 ..P WKT 2010 05 31 08 14 55 31.3200 -97.3300 251.000 30.0 171.118 4.080 -999.990 -999.990 1.711 ..P WKT 2010 05 31 08 19 55 31.3200 -97.3300 251.000 122.0 166.329 4.720 -999.990 -999.990 1.663 ..P WKT 2010 05 31 08 24 55 31.3200 -97.3300 251.000 457.0 144.188 3.890 -999.990 -999.990 1.442 ..P WKT 2010 05 31 08 34 55 31.3200 -97.3300 251.000 30.0 169.326 5.050 -999.990 -999.990 1.693 ..P WKT 2010 05 31 08 39 55 31.3200 -97.3300 251.000 122.0 171.165 3.540 -999.990 -999.990 1.712 ..P WKT 2010 05 31 08 44 55 31.3200 -97.3300 251.000 457.0 148.758 3.850 -999.990 -999.990 1.488 ..P WKT 2010 05 31 08 49 55 31.3200 -97.3300 251.000 30.0 172.640 3.570 -999.990 -999.990 1.726 ..P WKT 2010 05 31 08 54 55 31.3200 -97.3300 251.000 122.0 161.803 3.330 -999.990 -999.990 1.618 ..P WKT 2010 05 31 08 59 55 31.3200 -97.3300 251.000 457.0 147.242 2.850 -999.990 -999.990 1.472 ..P WKT 2010 05 31 09 09 55 31.3200 -97.3300 251.000 30.0 167.125 2.800 -999.990 -999.990 1.671 ..P WKT 2010 05 31 09 14 55 31.3200 -97.3300 251.000 122.0 158.842 3.050 -999.990 -999.990 1.588 ..P WKT 2010 05 31 09 19 55 31.3200 -97.3300 251.000 457.0 143.387 3.200 -999.990 -999.990 1.434 ..P WKT 2010 05 31 09 24 55 31.3200 -97.3300 251.000 30.0 166.679 3.510 -999.990 -999.990 1.667 ..P WKT 2010 05 31 09 29 55 31.3200 -97.3300 251.000 122.0 156.462 3.750 -999.990 -999.990 1.565 ..P WKT 2010 05 31 09 34 55 31.3200 -97.3300 251.000 457.0 141.690 2.760 -999.990 -999.990 1.417 ..P WKT 2010 05 31 09 44 55 31.3200 -97.3300 251.000 30.0 153.173 2.580 -999.990 -999.990 1.532 ..P WKT 2010 05 31 09 49 55 31.3200 -97.3300 251.000 122.0 155.841 2.680 -999.990 -999.990 1.558 ..P WKT 2010 05 31 09 54 55 31.3200 -97.3300 251.000 457.0 143.329 4.120 -999.990 -999.990 1.433 ..P WKT 2010 05 31 09 59 55 31.3200 -97.3300 251.000 30.0 154.141 2.630 -999.990 -999.990 1.541 ..P WKT 2010 05 31 10 04 55 31.3200 -97.3300 251.000 122.0 155.567 2.060 -999.990 -999.990 1.556 ..P WKT 2010 05 31 10 09 55 31.3200 -97.3300 251.000 457.0 143.465 4.070 -999.990 -999.990 1.435 ..P WKT 2010 05 31 10 19 55 31.3200 -97.3300 251.000 30.0 156.300 3.350 -999.990 -999.990 1.563 ..P WKT 2010 05 31 10 24 55 31.3200 -97.3300 251.000 122.0 157.491 2.500 -999.990 -999.990 1.575 ..P WKT 2010 05 31 10 29 55 31.3200 -97.3300 251.000 457.0 135.339 3.180 -999.990 -999.990 1.353 ..P WKT 2010 05 31 10 34 55 31.3200 -97.3300 251.000 30.0 160.013 3.620 -999.990 -999.990 1.600 ..P WKT 2010 05 31 10 39 55 31.3200 -97.3300 251.000 122.0 157.060 3.760 -999.990 -999.990 1.571 ..P WKT 2010 05 31 10 44 55 31.3200 -97.3300 251.000 457.0 138.216 4.340 -999.990 -999.990 1.382 ..P WKT 2010 05 31 10 54 55 31.3200 -97.3300 251.000 30.0 156.451 4.980 -999.990 -999.990 1.565 ..P WKT 2010 05 31 10 59 55 31.3200 -97.3300 251.000 122.0 152.628 4.090 -999.990 -999.990 1.526 ..P WKT 2010 05 31 11 04 55 31.3200 -97.3300 251.000 457.0 141.338 3.970 -999.990 -999.990 1.413 ..P WKT 2010 05 31 11 09 55 31.3200 -97.3300 251.000 30.0 161.570 3.960 -999.990 -999.990 1.616 ..P WKT 2010 05 31 11 14 55 31.3200 -97.3300 251.000 122.0 159.405 3.280 -999.990 -999.990 1.594 ..P WKT 2010 05 31 11 19 55 31.3200 -97.3300 251.000 457.0 146.452 3.250 -999.990 -999.990 1.465 ..P WKT 2010 05 31 11 29 55 31.3200 -97.3300 251.000 30.0 160.857 3.300 -999.990 -999.990 1.609 ..P WKT 2010 05 31 11 34 55 31.3200 -97.3300 251.000 122.0 160.276 3.570 -999.990 -999.990 1.603 ..P WKT 2010 05 31 11 39 55 31.3200 -97.3300 251.000 457.0 149.180 3.600 -999.990 -999.990 1.492 ..P WKT 2010 05 31 11 44 55 31.3200 -97.3300 251.000 30.0 161.054 4.420 -999.990 -999.990 1.611 ..P WKT 2010 05 31 11 49 55 31.3200 -97.3300 251.000 122.0 155.214 3.690 -999.990 -999.990 1.552 ..P WKT 2010 05 31 12 09 55 31.3200 -97.3300 251.000 457.0 141.000 2.830 -999.990 -999.990 1.410 ..P WKT 2010 05 31 12 10 25 31.3200 -97.3300 251.000 457.0 153.461 2.470 -999.990 -999.990 1.535 ..P WKT 2010 05 31 12 10 55 31.3200 -97.3300 251.000 457.0 144.875 1.970 -999.990 -999.990 1.449 ..P WKT 2010 05 31 12 11 25 31.3200 -97.3300 251.000 457.0 149.860 2.230 -999.990 -999.990 1.499 ..P WKT 2010 05 31 12 11 55 31.3200 -97.3300 251.000 457.0 147.643 2.040 -999.990 -999.990 1.476 ..P WKT 2010 05 31 12 12 25 31.3200 -97.3300 251.000 457.0 153.181 2.810 -999.990 -999.990 1.532 ..P WKT 2010 05 31 12 12 55 31.3200 -97.3300 251.000 457.0 151.519 2.810 -999.990 -999.990 1.515 ..P WKT 2010 05 31 12 13 25 31.3200 -97.3300 251.000 457.0 152.903 2.930 -999.990 -999.990 1.529 ..P WKT 2010 05 31 12 13 55 31.3200 -97.3300 251.000 457.0 151.794 3.370 -999.990 -999.990 1.518 ..P WKT 2010 05 31 12 14 25 31.3200 -97.3300 251.000 457.0 145.700 2.350 -999.990 -999.990 1.457 ..P WKT 2010 05 31 12 14 55 31.3200 -97.3300 251.000 457.0 150.130 2.220 -999.990 -999.990 1.501 ..P WKT 2010 05 31 12 19 55 31.3200 -97.3300 251.000 30.0 157.046 2.630 -999.990 -999.990 1.570 ..P WKT 2010 05 31 12 24 55 31.3200 -97.3300 251.000 122.0 156.484 2.320 -999.990 -999.990 1.565 ..P WKT 2010 05 31 12 29 55 31.3200 -97.3300 251.000 457.0 153.982 2.420 -999.990 -999.990 1.540 ..P WKT 2010 05 31 12 34 55 31.3200 -97.3300 251.000 30.0 160.900 2.520 -999.990 -999.990 1.609 ..P WKT 2010 05 31 12 39 55 31.3200 -97.3300 251.000 122.0 154.796 2.910 -999.990 -999.990 1.548 ..P WKT 2010 05 31 12 44 55 31.3200 -97.3300 251.000 457.0 144.670 3.150 -999.990 -999.990 1.447 ..P WKT 2010 05 31 12 54 55 31.3200 -97.3300 251.000 30.0 165.795 3.230 -999.990 -999.990 1.658 ..P WKT 2010 05 31 12 59 55 31.3200 -97.3300 251.000 122.0 149.921 4.560 -999.990 -999.990 1.499 ..P WKT 2010 05 31 13 04 55 31.3200 -97.3300 251.000 457.0 147.768 3.700 -999.990 -999.990 1.478 ..P WKT 2010 05 31 13 09 55 31.3200 -97.3300 251.000 30.0 168.770 3.780 -999.990 -999.990 1.688 ..P WKT 2010 05 31 13 14 55 31.3200 -97.3300 251.000 122.0 165.510 3.680 -999.990 -999.990 1.655 ..P WKT 2010 05 31 13 19 55 31.3200 -97.3300 251.000 457.0 147.548 4.350 -999.990 -999.990 1.475 ..P WKT 2010 05 31 13 29 55 31.3200 -97.3300 251.000 30.0 163.433 3.500 -999.990 -999.990 1.634 ..P WKT 2010 05 31 13 34 55 31.3200 -97.3300 251.000 122.0 166.493 5.430 -999.990 -999.990 1.665 ..P WKT 2010 05 31 13 39 55 31.3200 -97.3300 251.000 457.0 147.077 3.560 -999.990 -999.990 1.471 ..P WKT 2010 05 31 13 44 55 31.3200 -97.3300 251.000 30.0 162.347 2.980 -999.990 -999.990 1.623 ..P WKT 2010 05 31 13 49 55 31.3200 -97.3300 251.000 122.0 164.019 2.850 -999.990 -999.990 1.640 ..P WKT 2010 05 31 13 54 55 31.3200 -97.3300 251.000 457.0 150.009 3.210 -999.990 -999.990 1.500 ..P WKT 2010 05 31 14 04 55 31.3200 -97.3300 251.000 30.0 158.291 2.690 -999.990 -999.990 1.583 ..P WKT 2010 05 31 14 09 55 31.3200 -97.3300 251.000 122.0 156.295 3.100 -999.990 -999.990 1.563 ..P WKT 2010 05 31 14 14 55 31.3200 -97.3300 251.000 457.0 145.135 3.370 -999.990 -999.990 1.451 ..P WKT 2010 05 31 14 19 55 31.3200 -97.3300 251.000 30.0 157.441 3.840 -999.990 -999.990 1.574 ..P WKT 2010 05 31 14 24 55 31.3200 -97.3300 251.000 122.0 163.777 3.230 -999.990 -999.990 1.638 ..P WKT 2010 05 31 14 29 55 31.3200 -97.3300 251.000 457.0 141.084 3.940 -999.990 -999.990 1.411 ..P WKT 2010 05 31 14 39 55 31.3200 -97.3300 251.000 30.0 158.918 3.760 -999.990 -999.990 1.589 ..P WKT 2010 05 31 14 44 55 31.3200 -97.3300 251.000 122.0 162.915 2.940 -999.990 -999.990 1.629 ..P WKT 2010 05 31 14 49 55 31.3200 -97.3300 251.000 457.0 147.736 3.300 -999.990 -999.990 1.477 ..P WKT 2010 05 31 14 54 55 31.3200 -97.3300 251.000 30.0 150.204 2.980 -999.990 -999.990 1.502 ..P WKT 2010 05 31 14 59 55 31.3200 -97.3300 251.000 122.0 161.290 4.440 -999.990 -999.990 1.613 ..P WKT 2010 05 31 15 04 55 31.3200 -97.3300 251.000 457.0 143.743 2.640 -999.990 -999.990 1.437 ..P WKT 2010 05 31 15 14 55 31.3200 -97.3300 251.000 30.0 151.977 2.300 -999.990 -999.990 1.520 ..P WKT 2010 05 31 15 19 55 31.3200 -97.3300 251.000 122.0 165.531 3.280 -999.990 -999.990 1.655 ..P WKT 2010 05 31 15 24 55 31.3200 -97.3300 251.000 457.0 144.877 2.850 -999.990 -999.990 1.449 ..P WKT 2010 05 31 15 29 55 31.3200 -97.3300 251.000 30.0 156.208 2.820 -999.990 -999.990 1.562 ..P WKT 2010 05 31 15 34 55 31.3200 -97.3300 251.000 122.0 162.535 3.810 -999.990 -999.990 1.625 ..P WKT 2010 05 31 15 39 55 31.3200 -97.3300 251.000 457.0 149.385 3.050 -999.990 -999.990 1.494 ..P WKT 2010 05 31 15 49 55 31.3200 -97.3300 251.000 30.0 167.845 3.720 -999.990 -999.990 1.678 ..P WKT 2010 05 31 15 54 55 31.3200 -97.3300 251.000 122.0 166.899 4.640 -999.990 -999.990 1.669 ..P WKT 2010 05 31 15 59 55 31.3200 -97.3300 251.000 457.0 150.365 3.560 -999.990 -999.990 1.504 ..P WKT 2010 05 31 16 04 55 31.3200 -97.3300 251.000 30.0 155.820 3.340 -999.990 -999.990 1.558 ..P WKT 2010 05 31 16 09 55 31.3200 -97.3300 251.000 122.0 166.288 3.130 -999.990 -999.990 1.663 ..P WKT 2010 05 31 16 14 55 31.3200 -97.3300 251.000 457.0 153.368 2.940 -999.990 -999.990 1.534 ..P WKT 2010 05 31 16 24 55 31.3200 -97.3300 251.000 30.0 158.892 2.790 -999.990 -999.990 1.589 ..P WKT 2010 05 31 16 29 55 31.3200 -97.3300 251.000 122.0 163.415 3.620 -999.990 -999.990 1.634 ..P WKT 2010 05 31 16 34 55 31.3200 -97.3300 251.000 457.0 154.569 3.950 -999.990 -999.990 1.546 ..P WKT 2010 05 31 16 39 55 31.3200 -97.3300 251.000 30.0 155.471 2.960 -999.990 -999.990 1.555 ..P WKT 2010 05 31 16 44 55 31.3200 -97.3300 251.000 122.0 165.011 2.870 -999.990 -999.990 1.650 ..P WKT 2010 05 31 16 49 55 31.3200 -97.3300 251.000 457.0 157.555 2.600 -999.990 -999.990 1.576 ..P WKT 2010 05 31 17 04 55 31.3200 -97.3300 251.000 30.0 158.124 2.420 -999.990 -999.990 1.581 ..P WKT 2010 05 31 17 09 55 31.3200 -97.3300 251.000 122.0 167.226 2.010 -999.990 -999.990 1.672 ..P WKT 2010 05 31 17 14 55 31.3200 -97.3300 251.000 457.0 155.001 1.970 -999.990 -999.990 1.550 ..P WKT 2010 05 31 17 19 55 31.3200 -97.3300 251.000 30.0 159.226 3.770 -999.990 -999.990 1.592 ..P WKT 2010 05 31 17 24 55 31.3200 -97.3300 251.000 122.0 160.383 2.670 -999.990 -999.990 1.604 ..P WKT 2010 05 31 17 29 55 31.3200 -97.3300 251.000 457.0 154.987 2.670 -999.990 -999.990 1.550 ..P WKT 2010 05 31 17 39 55 31.3200 -97.3300 251.000 30.0 157.944 2.750 -999.990 -999.990 1.579 ..P WKT 2010 05 31 17 44 55 31.3200 -97.3300 251.000 122.0 163.792 2.860 -999.990 -999.990 1.638 ..P WKT 2010 05 31 17 49 55 31.3200 -97.3300 251.000 457.0 159.594 2.910 -999.990 -999.990 1.596 ..P WKT 2010 05 31 17 54 55 31.3200 -97.3300 251.000 30.0 156.093 3.000 -999.990 -999.990 1.561 ..P WKT 2010 05 31 17 59 55 31.3200 -97.3300 251.000 122.0 167.105 3.100 -999.990 -999.990 1.671 ..P WKT 2010 05 31 18 04 55 31.3200 -97.3300 251.000 457.0 150.903 2.630 -999.990 -999.990 1.509 ..P WKT 2010 05 31 18 14 55 31.3200 -97.3300 251.000 30.0 157.836 3.540 -999.990 -999.990 1.578 ..P WKT 2010 05 31 18 19 55 31.3200 -97.3300 251.000 122.0 156.686 3.800 -999.990 -999.990 1.567 ..P WKT 2010 05 31 18 24 55 31.3200 -97.3300 251.000 457.0 155.815 3.900 -999.990 -999.990 1.558 ..P WKT 2010 05 31 18 29 55 31.3200 -97.3300 251.000 30.0 157.319 3.620 -999.990 -999.990 1.573 ..P WKT 2010 05 31 18 34 55 31.3200 -97.3300 251.000 122.0 162.314 4.790 -999.990 -999.990 1.623 ..P WKT 2010 05 31 18 39 55 31.3200 -97.3300 251.000 457.0 157.952 3.300 -999.990 -999.990 1.580 ..P WKT 2010 05 31 18 49 55 31.3200 -97.3300 251.000 30.0 153.774 2.820 -999.990 -999.990 1.538 ..P WKT 2010 05 31 18 54 55 31.3200 -97.3300 251.000 122.0 162.484 3.230 -999.990 -999.990 1.625 ..P WKT 2010 05 31 18 59 55 31.3200 -97.3300 251.000 457.0 161.414 5.290 -999.990 -999.990 1.614 ..P WKT 2010 05 31 19 04 55 31.3200 -97.3300 251.000 30.0 150.281 3.910 -999.990 -999.990 1.503 ..P WKT 2010 05 31 19 09 55 31.3200 -97.3300 251.000 122.0 161.230 4.530 -999.990 -999.990 1.612 ..P WKT 2010 05 31 19 14 55 31.3200 -97.3300 251.000 457.0 158.202 2.540 -999.990 -999.990 1.582 ..P WKT 2010 05 31 19 24 55 31.3200 -97.3300 251.000 30.0 149.388 3.750 -999.990 -999.990 1.494 ..P WKT 2010 05 31 19 29 55 31.3200 -97.3300 251.000 122.0 154.788 3.410 -999.990 -999.990 1.548 ..P WKT 2010 05 31 19 34 55 31.3200 -97.3300 251.000 457.0 147.323 4.250 -999.990 -999.990 1.473 ..P WKT 2010 05 31 19 39 55 31.3200 -97.3300 251.000 30.0 148.248 3.560 -999.990 -999.990 1.482 ..P WKT 2010 05 31 19 44 55 31.3200 -97.3300 251.000 122.0 161.483 3.040 -999.990 -999.990 1.615 ..P WKT 2010 05 31 19 49 55 31.3200 -97.3300 251.000 457.0 154.016 3.710 -999.990 -999.990 1.540 ..P WKT 2010 05 31 19 59 55 31.3200 -97.3300 251.000 30.0 158.467 2.480 -999.990 -999.990 1.585 ..P WKT 2010 05 31 20 04 55 31.3200 -97.3300 251.000 122.0 157.795 3.280 -999.990 -999.990 1.578 ..P WKT 2010 05 31 20 09 55 31.3200 -97.3300 251.000 457.0 152.923 3.520 -999.990 -999.990 1.529 ..P WKT 2010 05 31 20 14 55 31.3200 -97.3300 251.000 30.0 151.410 2.830 -999.990 -999.990 1.514 ..P WKT 2010 05 31 20 19 55 31.3200 -97.3300 251.000 122.0 155.496 3.590 -999.990 -999.990 1.555 ..P WKT 2010 05 31 20 24 55 31.3200 -97.3300 251.000 457.0 151.743 2.520 -999.990 -999.990 1.517 ..P WKT 2010 05 31 20 34 55 31.3200 -97.3300 251.000 30.0 151.776 2.500 -999.990 -999.990 1.518 ..P WKT 2010 05 31 20 39 55 31.3200 -97.3300 251.000 122.0 158.085 2.980 -999.990 -999.990 1.581 ..P WKT 2010 05 31 20 44 55 31.3200 -97.3300 251.000 457.0 148.988 3.060 -999.990 -999.990 1.490 ..P WKT 2010 05 31 20 49 55 31.3200 -97.3300 251.000 30.0 163.563 3.290 -999.990 -999.990 1.636 ..P WKT 2010 05 31 20 54 55 31.3200 -97.3300 251.000 122.0 159.648 3.810 -999.990 -999.990 1.596 ..P WKT 2010 05 31 20 59 55 31.3200 -97.3300 251.000 457.0 154.191 2.670 -999.990 -999.990 1.542 ..P WKT 2010 05 31 21 09 55 31.3200 -97.3300 251.000 30.0 152.663 2.830 -999.990 -999.990 1.527 ..P WKT 2010 05 31 21 14 55 31.3200 -97.3300 251.000 122.0 156.594 2.450 -999.990 -999.990 1.566 ..P WKT 2010 05 31 21 19 55 31.3200 -97.3300 251.000 457.0 150.153 2.820 -999.990 -999.990 1.502 ..P WKT 2010 05 31 21 24 55 31.3200 -97.3300 251.000 30.0 151.421 2.200 -999.990 -999.990 1.514 ..P WKT 2010 05 31 21 29 55 31.3200 -97.3300 251.000 122.0 156.194 3.730 -999.990 -999.990 1.562 ..P WKT 2010 05 31 21 34 55 31.3200 -97.3300 251.000 457.0 151.854 3.660 -999.990 -999.990 1.519 ..P WKT 2010 05 31 21 44 55 31.3200 -97.3300 251.000 30.0 161.244 4.350 -999.990 -999.990 1.612 ..P WKT 2010 05 31 21 49 55 31.3200 -97.3300 251.000 122.0 159.829 3.970 -999.990 -999.990 1.598 ..P WKT 2010 05 31 21 54 55 31.3200 -97.3300 251.000 457.0 158.694 3.060 -999.990 -999.990 1.587 ..P WKT 2010 05 31 21 59 55 31.3200 -97.3300 251.000 30.0 159.664 3.800 -999.990 -999.990 1.597 ..P WKT 2010 05 31 22 04 55 31.3200 -97.3300 251.000 122.0 161.335 3.180 -999.990 -999.990 1.613 ..P WKT 2010 05 31 22 09 55 31.3200 -97.3300 251.000 457.0 160.620 3.990 -999.990 -999.990 1.606 ..P WKT 2010 05 31 22 19 55 31.3200 -97.3300 251.000 30.0 151.212 3.240 -999.990 -999.990 1.512 ..P WKT 2010 05 31 22 24 55 31.3200 -97.3300 251.000 122.0 161.606 3.310 -999.990 -999.990 1.616 ..P WKT 2010 05 31 22 29 55 31.3200 -97.3300 251.000 457.0 154.594 3.580 -999.990 -999.990 1.546 ..P WKT 2010 05 31 22 34 55 31.3200 -97.3300 251.000 30.0 154.320 3.640 -999.990 -999.990 1.543 ..P WKT 2010 05 31 22 39 55 31.3200 -97.3300 251.000 122.0 162.753 3.530 -999.990 -999.990 1.628 ..P WKT 2010 05 31 22 44 55 31.3200 -97.3300 251.000 457.0 153.210 3.790 -999.990 -999.990 1.532 ..P WKT 2010 05 31 22 54 55 31.3200 -97.3300 251.000 30.0 165.264 4.680 -999.990 -999.990 1.653 ..P WKT 2010 05 31 22 59 55 31.3200 -97.3300 251.000 122.0 172.819 4.870 -999.990 -999.990 1.728 ..P WKT 2010 05 31 23 04 55 31.3200 -97.3300 251.000 457.0 162.952 4.780 -999.990 -999.990 1.630 ..P WKT 2010 05 31 23 09 55 31.3200 -97.3300 251.000 30.0 167.417 3.680 -999.990 -999.990 1.674 ..P WKT 2010 05 31 23 14 55 31.3200 -97.3300 251.000 122.0 170.757 4.080 -999.990 -999.990 1.708 ..P WKT 2010 05 31 23 19 55 31.3200 -97.3300 251.000 457.0 170.163 3.530 -999.990 -999.990 1.702 ..P WKT 2010 05 31 23 29 55 31.3200 -97.3300 251.000 30.0 165.660 2.960 -999.990 -999.990 1.657 ..P WKT 2010 05 31 23 34 55 31.3200 -97.3300 251.000 122.0 170.466 2.940 -999.990 -999.990 1.705 ..P WKT 2010 05 31 23 39 55 31.3200 -97.3300 251.000 457.0 165.430 3.430 -999.990 -999.990 1.654 ..P WKT 2010 05 31 23 44 55 31.3200 -97.3300 251.000 30.0 163.486 3.400 -999.990 -999.990 1.635 ..P WKT 2010 05 31 23 49 55 31.3200 -97.3300 251.000 122.0 164.356 3.270 -999.990 -999.990 1.644 ..P