# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-06-02 08:40:10 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO (In Situ) # Arlyn Andrews # tel: (303) 497-6773 # email: Arlyn.Andrews@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "Blackland Research and Extension Center-Texas Agricultural # Experiment Station" without whom these measurements would not # be possible. # # URL: http://www.pinnacletowers.com/ # # Sensors were installed on the KWKT-TV transmitter tower in February # 2001. In May 2006, this site became the first to use our newly # redesigned instrumentation suite. The upgrades were made in # time for the Texas Air Quality Study 2006 . We also carried # out a demonstration study during 2006 where an O3 sensor was # mounted at our highest sampling level (457 m above ground level). # The O3 data showed clear evidence of nighttime transport of # ozone in the nocturnal jet at the top of the planetary boundary # layer. This site periodically samples air that has passed over # the Dallas - Fort Worth and Houston metropolitan areas. At other # times, the site samples relatively clean air from the Gulf of # Mexico. Summertime weather patterns are dominated by a monsoonal # circulation over the Gulf. WKT thus provides a measurement of # the initial CO2 concentration for air passing over the continent # from the south. As air moves northward, the CO2 concentration # is modified by the action of sources (fossil fuel combustion, # plant respiration, biomass burning, cement production) and sinks # (photosynthesis). Partners: Blackland Research and Extension # Center-Texas Agricultural Experiment Station (Onyango Okello). # # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # code yr mo dy hr mn sc lat lon elev(masl) ht(magl) value totunc atmvar measunc scaleunc flag WKT 2010 06 01 00 09 55 31.3200 -97.3300 251.000 457.0 155.333 2.790 -999.990 -999.990 1.553 ..P WKT 2010 06 01 00 10 25 31.3200 -97.3300 251.000 457.0 156.450 2.780 -999.990 -999.990 1.565 ..P WKT 2010 06 01 00 10 55 31.3200 -97.3300 251.000 457.0 158.271 2.510 -999.990 -999.990 1.583 ..P WKT 2010 06 01 00 11 25 31.3200 -97.3300 251.000 457.0 156.576 2.760 -999.990 -999.990 1.566 ..P WKT 2010 06 01 00 11 55 31.3200 -97.3300 251.000 457.0 155.583 2.660 -999.990 -999.990 1.556 ..P WKT 2010 06 01 00 12 25 31.3200 -97.3300 251.000 457.0 154.310 2.630 -999.990 -999.990 1.543 ..P WKT 2010 06 01 00 12 55 31.3200 -97.3300 251.000 457.0 152.475 2.430 -999.990 -999.990 1.525 ..P WKT 2010 06 01 00 13 25 31.3200 -97.3300 251.000 457.0 154.013 2.530 -999.990 -999.990 1.540 ..P WKT 2010 06 01 00 13 55 31.3200 -97.3300 251.000 457.0 156.818 2.750 -999.990 -999.990 1.568 ..P WKT 2010 06 01 00 14 25 31.3200 -97.3300 251.000 457.0 158.075 3.840 -999.990 -999.990 1.581 ..P WKT 2010 06 01 00 14 55 31.3200 -97.3300 251.000 457.0 162.427 4.660 -999.990 -999.990 1.624 ..P WKT 2010 06 01 00 19 55 31.3200 -97.3300 251.000 30.0 156.865 3.550 -999.990 -999.990 1.569 ..P WKT 2010 06 01 00 24 55 31.3200 -97.3300 251.000 122.0 164.940 3.060 -999.990 -999.990 1.649 ..P WKT 2010 06 01 00 29 55 31.3200 -97.3300 251.000 457.0 157.552 4.210 -999.990 -999.990 1.576 ..P WKT 2010 06 01 00 34 55 31.3200 -97.3300 251.000 30.0 162.814 2.670 -999.990 -999.990 1.628 ..P WKT 2010 06 01 00 39 55 31.3200 -97.3300 251.000 122.0 164.421 3.310 -999.990 -999.990 1.644 ..P WKT 2010 06 01 00 44 55 31.3200 -97.3300 251.000 457.0 165.466 2.130 -999.990 -999.990 1.655 ..P WKT 2010 06 01 00 54 55 31.3200 -97.3300 251.000 30.0 159.852 2.800 -999.990 -999.990 1.599 ..P WKT 2010 06 01 00 59 55 31.3200 -97.3300 251.000 122.0 163.588 3.030 -999.990 -999.990 1.636 ..P WKT 2010 06 01 01 04 55 31.3200 -97.3300 251.000 457.0 166.620 3.650 -999.990 -999.990 1.666 ..P WKT 2010 06 01 01 09 55 31.3200 -97.3300 251.000 30.0 166.002 3.950 -999.990 -999.990 1.660 ..P WKT 2010 06 01 01 14 55 31.3200 -97.3300 251.000 122.0 167.629 2.440 -999.990 -999.990 1.676 ..P WKT 2010 06 01 01 19 55 31.3200 -97.3300 251.000 457.0 162.379 2.340 -999.990 -999.990 1.624 ..P WKT 2010 06 01 01 29 55 31.3200 -97.3300 251.000 30.0 168.660 3.610 -999.990 -999.990 1.687 ..P WKT 2010 06 01 01 34 55 31.3200 -97.3300 251.000 122.0 166.439 2.870 -999.990 -999.990 1.664 ..P WKT 2010 06 01 01 39 55 31.3200 -97.3300 251.000 457.0 160.991 3.340 -999.990 -999.990 1.610 ..P WKT 2010 06 01 01 44 55 31.3200 -97.3300 251.000 30.0 168.449 2.140 -999.990 -999.990 1.684 ..P WKT 2010 06 01 01 49 55 31.3200 -97.3300 251.000 122.0 173.661 2.330 -999.990 -999.990 1.737 ..P WKT 2010 06 01 01 54 55 31.3200 -97.3300 251.000 457.0 169.757 2.940 -999.990 -999.990 1.698 ..P WKT 2010 06 01 02 04 55 31.3200 -97.3300 251.000 30.0 171.284 2.660 -999.990 -999.990 1.713 ..P WKT 2010 06 01 02 09 55 31.3200 -97.3300 251.000 122.0 170.265 3.190 -999.990 -999.990 1.703 ..P WKT 2010 06 01 02 14 55 31.3200 -97.3300 251.000 457.0 164.763 2.740 -999.990 -999.990 1.648 ..P WKT 2010 06 01 02 19 55 31.3200 -97.3300 251.000 30.0 173.273 3.670 -999.990 -999.990 1.733 ..P WKT 2010 06 01 02 24 55 31.3200 -97.3300 251.000 122.0 173.376 4.120 -999.990 -999.990 1.734 ..P WKT 2010 06 01 02 29 55 31.3200 -97.3300 251.000 457.0 155.267 3.700 -999.990 -999.990 1.553 ..P WKT 2010 06 01 02 39 55 31.3200 -97.3300 251.000 30.0 189.046 3.600 -999.990 -999.990 1.890 ..P WKT 2010 06 01 02 44 55 31.3200 -97.3300 251.000 122.0 156.062 3.790 -999.990 -999.990 1.561 ..P WKT 2010 06 01 02 49 55 31.3200 -97.3300 251.000 457.0 156.686 3.670 -999.990 -999.990 1.567 ..P WKT 2010 06 01 02 54 55 31.3200 -97.3300 251.000 30.0 185.587 3.810 -999.990 -999.990 1.856 ..P WKT 2010 06 01 02 59 55 31.3200 -97.3300 251.000 122.0 162.134 3.770 -999.990 -999.990 1.621 ..P WKT 2010 06 01 03 04 55 31.3200 -97.3300 251.000 457.0 149.602 4.090 -999.990 -999.990 1.496 ..P WKT 2010 06 01 03 14 55 31.3200 -97.3300 251.000 30.0 171.877 3.860 -999.990 -999.990 1.719 ..P WKT 2010 06 01 03 19 55 31.3200 -97.3300 251.000 122.0 170.581 3.620 -999.990 -999.990 1.706 ..P WKT 2010 06 01 03 24 55 31.3200 -97.3300 251.000 457.0 156.977 3.480 -999.990 -999.990 1.570 ..P WKT 2010 06 01 03 29 55 31.3200 -97.3300 251.000 30.0 171.625 4.020 -999.990 -999.990 1.716 ..P WKT 2010 06 01 03 34 55 31.3200 -97.3300 251.000 122.0 175.642 2.990 -999.990 -999.990 1.756 ..P WKT 2010 06 01 03 39 55 31.3200 -97.3300 251.000 457.0 159.527 3.070 -999.990 -999.990 1.595 ..P WKT 2010 06 01 03 49 55 31.3200 -97.3300 251.000 30.0 173.092 2.650 -999.990 -999.990 1.731 ..P WKT 2010 06 01 03 54 55 31.3200 -97.3300 251.000 122.0 162.793 2.890 -999.990 -999.990 1.628 ..P WKT 2010 06 01 03 59 55 31.3200 -97.3300 251.000 457.0 156.270 2.720 -999.990 -999.990 1.563 ..P WKT 2010 06 01 04 04 55 31.3200 -97.3300 251.000 30.0 173.219 2.640 -999.990 -999.990 1.732 ..P WKT 2010 06 01 04 09 55 31.3200 -97.3300 251.000 122.0 164.321 2.260 -999.990 -999.990 1.643 ..P WKT 2010 06 01 04 14 55 31.3200 -97.3300 251.000 457.0 149.140 2.210 -999.990 -999.990 1.491 ..P WKT 2010 06 01 04 24 55 31.3200 -97.3300 251.000 30.0 179.131 4.330 -999.990 -999.990 1.791 ..P WKT 2010 06 01 04 29 55 31.3200 -97.3300 251.000 122.0 160.764 2.310 -999.990 -999.990 1.608 ..P WKT 2010 06 01 04 34 55 31.3200 -97.3300 251.000 457.0 153.151 2.470 -999.990 -999.990 1.532 ..P WKT 2010 06 01 04 39 55 31.3200 -97.3300 251.000 30.0 174.709 2.940 -999.990 -999.990 1.747 ..P WKT 2010 06 01 04 44 55 31.3200 -97.3300 251.000 122.0 165.282 3.130 -999.990 -999.990 1.653 ..P WKT 2010 06 01 04 49 55 31.3200 -97.3300 251.000 457.0 151.950 3.150 -999.990 -999.990 1.519 ..P WKT 2010 06 01 05 04 55 31.3200 -97.3300 251.000 30.0 182.007 3.550 -999.990 -999.990 1.820 ..P WKT 2010 06 01 05 09 55 31.3200 -97.3300 251.000 122.0 155.510 3.380 -999.990 -999.990 1.555 ..P WKT 2010 06 01 05 14 55 31.3200 -97.3300 251.000 457.0 144.915 3.240 -999.990 -999.990 1.449 ..P WKT 2010 06 01 05 19 55 31.3200 -97.3300 251.000 30.0 179.353 3.900 -999.990 -999.990 1.794 ..P WKT 2010 06 01 05 24 55 31.3200 -97.3300 251.000 122.0 156.631 3.720 -999.990 -999.990 1.566 ..P WKT 2010 06 01 05 29 55 31.3200 -97.3300 251.000 457.0 146.737 3.980 -999.990 -999.990 1.467 ..P WKT 2010 06 01 05 39 55 31.3200 -97.3300 251.000 30.0 172.544 4.380 -999.990 -999.990 1.725 ..P WKT 2010 06 01 05 44 55 31.3200 -97.3300 251.000 122.0 149.997 3.160 -999.990 -999.990 1.500 ..P WKT 2010 06 01 05 49 55 31.3200 -97.3300 251.000 457.0 144.311 2.910 -999.990 -999.990 1.443 ..P WKT 2010 06 01 05 54 55 31.3200 -97.3300 251.000 30.0 167.039 2.710 -999.990 -999.990 1.670 ..P WKT 2010 06 01 05 59 55 31.3200 -97.3300 251.000 122.0 148.819 4.160 -999.990 -999.990 1.488 ..P WKT 2010 06 01 06 04 55 31.3200 -97.3300 251.000 457.0 143.136 1.930 -999.990 -999.990 1.431 ..P WKT 2010 06 01 06 14 55 31.3200 -97.3300 251.000 30.0 171.604 2.500 -999.990 -999.990 1.716 ..P WKT 2010 06 01 06 19 55 31.3200 -97.3300 251.000 122.0 143.951 2.280 -999.990 -999.990 1.440 ..P WKT 2010 06 01 06 24 55 31.3200 -97.3300 251.000 457.0 136.900 3.010 -999.990 -999.990 1.369 ..P WKT 2010 06 01 06 29 55 31.3200 -97.3300 251.000 30.0 166.583 2.190 -999.990 -999.990 1.666 ..P WKT 2010 06 01 06 34 55 31.3200 -97.3300 251.000 122.0 154.523 4.640 -999.990 -999.990 1.545 ..P WKT 2010 06 01 06 39 55 31.3200 -97.3300 251.000 457.0 139.127 2.600 -999.990 -999.990 1.391 ..P WKT 2010 06 01 06 49 55 31.3200 -97.3300 251.000 30.0 162.105 2.870 -999.990 -999.990 1.621 ..P WKT 2010 06 01 06 54 55 31.3200 -97.3300 251.000 122.0 153.747 4.000 -999.990 -999.990 1.537 ..P WKT 2010 06 01 06 59 55 31.3200 -97.3300 251.000 457.0 146.225 2.870 -999.990 -999.990 1.462 ..P WKT 2010 06 01 07 04 55 31.3200 -97.3300 251.000 30.0 159.833 2.930 -999.990 -999.990 1.598 ..P WKT 2010 06 01 07 09 55 31.3200 -97.3300 251.000 122.0 167.322 2.260 -999.990 -999.990 1.673 ..P WKT 2010 06 01 07 14 55 31.3200 -97.3300 251.000 457.0 144.516 2.320 -999.990 -999.990 1.445 ..P WKT 2010 06 01 07 24 55 31.3200 -97.3300 251.000 30.0 160.425 4.990 -999.990 -999.990 1.604 ..P WKT 2010 06 01 07 29 55 31.3200 -97.3300 251.000 122.0 169.954 3.060 -999.990 -999.990 1.700 ..P WKT 2010 06 01 07 34 55 31.3200 -97.3300 251.000 457.0 137.259 3.790 -999.990 -999.990 1.373 ..P WKT 2010 06 01 07 39 55 31.3200 -97.3300 251.000 30.0 154.287 3.130 -999.990 -999.990 1.543 ..P WKT 2010 06 01 07 44 55 31.3200 -97.3300 251.000 122.0 166.035 2.330 -999.990 -999.990 1.660 ..P WKT 2010 06 01 07 49 55 31.3200 -97.3300 251.000 457.0 139.323 2.340 -999.990 -999.990 1.393 ..P WKT 2010 06 01 07 59 55 31.3200 -97.3300 251.000 30.0 145.583 4.090 -999.990 -999.990 1.456 ..P WKT 2010 06 01 08 04 55 31.3200 -97.3300 251.000 122.0 166.186 2.680 -999.990 -999.990 1.662 ..P WKT 2010 06 01 08 09 55 31.3200 -97.3300 251.000 457.0 138.083 3.240 -999.990 -999.990 1.381 ..P WKT 2010 06 01 08 14 55 31.3200 -97.3300 251.000 30.0 151.745 2.580 -999.990 -999.990 1.517 ..P WKT 2010 06 01 08 19 55 31.3200 -97.3300 251.000 122.0 157.774 2.680 -999.990 -999.990 1.578 ..P WKT 2010 06 01 08 24 55 31.3200 -97.3300 251.000 457.0 140.085 3.430 -999.990 -999.990 1.401 ..P WKT 2010 06 01 08 34 55 31.3200 -97.3300 251.000 30.0 155.232 3.820 -999.990 -999.990 1.552 ..P WKT 2010 06 01 08 39 55 31.3200 -97.3300 251.000 122.0 155.612 3.280 -999.990 -999.990 1.556 ..P WKT 2010 06 01 08 44 55 31.3200 -97.3300 251.000 457.0 136.587 3.950 -999.990 -999.990 1.366 ..P WKT 2010 06 01 08 49 55 31.3200 -97.3300 251.000 30.0 154.018 4.520 -999.990 -999.990 1.540 ..P WKT 2010 06 01 08 54 55 31.3200 -97.3300 251.000 122.0 157.309 2.980 -999.990 -999.990 1.573 ..P WKT 2010 06 01 08 59 55 31.3200 -97.3300 251.000 457.0 127.484 2.790 -999.990 -999.990 1.275 ..P WKT 2010 06 01 09 09 55 31.3200 -97.3300 251.000 30.0 157.005 3.710 -999.990 -999.990 1.570 ..P WKT 2010 06 01 09 14 55 31.3200 -97.3300 251.000 122.0 142.507 2.630 -999.990 -999.990 1.425 ..P WKT 2010 06 01 09 19 55 31.3200 -97.3300 251.000 457.0 140.060 3.600 -999.990 -999.990 1.401 ..P WKT 2010 06 01 09 24 55 31.3200 -97.3300 251.000 30.0 148.968 2.820 -999.990 -999.990 1.490 ..P WKT 2010 06 01 09 29 55 31.3200 -97.3300 251.000 122.0 145.276 2.740 -999.990 -999.990 1.453 ..P WKT 2010 06 01 09 34 55 31.3200 -97.3300 251.000 457.0 136.324 3.490 -999.990 -999.990 1.363 ..P WKT 2010 06 01 09 44 55 31.3200 -97.3300 251.000 30.0 149.089 2.050 -999.990 -999.990 1.491 ..P WKT 2010 06 01 09 49 55 31.3200 -97.3300 251.000 122.0 151.012 2.410 -999.990 -999.990 1.510 ..P WKT 2010 06 01 09 54 55 31.3200 -97.3300 251.000 457.0 141.590 3.860 -999.990 -999.990 1.416 ..P WKT 2010 06 01 09 59 55 31.3200 -97.3300 251.000 30.0 158.730 3.400 -999.990 -999.990 1.587 ..P WKT 2010 06 01 10 04 55 31.3200 -97.3300 251.000 122.0 139.074 4.490 -999.990 -999.990 1.391 ..P WKT 2010 06 01 10 09 55 31.3200 -97.3300 251.000 457.0 143.210 3.180 -999.990 -999.990 1.432 ..P WKT 2010 06 01 10 19 55 31.3200 -97.3300 251.000 30.0 154.915 3.830 -999.990 -999.990 1.549 ..P WKT 2010 06 01 10 24 55 31.3200 -97.3300 251.000 122.0 145.065 3.790 -999.990 -999.990 1.451 ..P WKT 2010 06 01 10 29 55 31.3200 -97.3300 251.000 457.0 134.943 3.630 -999.990 -999.990 1.349 ..P WKT 2010 06 01 10 34 55 31.3200 -97.3300 251.000 30.0 148.868 2.880 -999.990 -999.990 1.489 ..P WKT 2010 06 01 10 39 55 31.3200 -97.3300 251.000 122.0 146.208 3.540 -999.990 -999.990 1.462 ..P WKT 2010 06 01 10 44 55 31.3200 -97.3300 251.000 457.0 132.775 2.740 -999.990 -999.990 1.328 ..P WKT 2010 06 01 10 54 55 31.3200 -97.3300 251.000 30.0 150.823 2.930 -999.990 -999.990 1.508 ..P WKT 2010 06 01 10 59 55 31.3200 -97.3300 251.000 122.0 146.114 2.900 -999.990 -999.990 1.461 ..P WKT 2010 06 01 11 04 55 31.3200 -97.3300 251.000 457.0 136.435 2.400 -999.990 -999.990 1.364 ..P WKT 2010 06 01 11 09 55 31.3200 -97.3300 251.000 30.0 146.638 2.680 -999.990 -999.990 1.466 ..P WKT 2010 06 01 11 14 55 31.3200 -97.3300 251.000 122.0 141.655 3.660 -999.990 -999.990 1.417 ..P WKT 2010 06 01 11 19 55 31.3200 -97.3300 251.000 457.0 133.361 2.330 -999.990 -999.990 1.334 ..P WKT 2010 06 01 11 29 55 31.3200 -97.3300 251.000 30.0 146.583 2.130 -999.990 -999.990 1.466 ..P WKT 2010 06 01 11 34 55 31.3200 -97.3300 251.000 122.0 138.567 2.440 -999.990 -999.990 1.386 ..P WKT 2010 06 01 11 39 55 31.3200 -97.3300 251.000 457.0 134.279 2.440 -999.990 -999.990 1.343 ..P WKT 2010 06 01 11 44 55 31.3200 -97.3300 251.000 30.0 148.472 3.250 -999.990 -999.990 1.485 ..P WKT 2010 06 01 11 49 55 31.3200 -97.3300 251.000 122.0 142.528 3.040 -999.990 -999.990 1.425 ..P WKT 2010 06 01 12 09 55 31.3200 -97.3300 251.000 457.0 134.416 3.710 -999.990 -999.990 1.344 ..P WKT 2010 06 01 12 10 25 31.3200 -97.3300 251.000 457.0 132.791 3.730 -999.990 -999.990 1.328 ..P WKT 2010 06 01 12 10 55 31.3200 -97.3300 251.000 457.0 125.097 3.130 -999.990 -999.990 1.251 ..P WKT 2010 06 01 12 11 25 31.3200 -97.3300 251.000 457.0 126.092 2.780 -999.990 -999.990 1.261 ..P WKT 2010 06 01 12 11 55 31.3200 -97.3300 251.000 457.0 131.915 4.280 -999.990 -999.990 1.319 ..P WKT 2010 06 01 12 12 25 31.3200 -97.3300 251.000 457.0 132.220 3.300 -999.990 -999.990 1.322 ..P WKT 2010 06 01 12 12 55 31.3200 -97.3300 251.000 457.0 136.802 3.390 -999.990 -999.990 1.368 ..P WKT 2010 06 01 12 13 25 31.3200 -97.3300 251.000 457.0 134.626 2.650 -999.990 -999.990 1.346 ..P WKT 2010 06 01 12 13 55 31.3200 -97.3300 251.000 457.0 132.724 3.110 -999.990 -999.990 1.327 ..P WKT 2010 06 01 12 14 25 31.3200 -97.3300 251.000 457.0 134.133 2.850 -999.990 -999.990 1.341 ..P WKT 2010 06 01 12 14 55 31.3200 -97.3300 251.000 457.0 131.680 2.710 -999.990 -999.990 1.317 ..P WKT 2010 06 01 12 19 55 31.3200 -97.3300 251.000 30.0 142.740 2.670 -999.990 -999.990 1.427 ..P WKT 2010 06 01 12 24 55 31.3200 -97.3300 251.000 122.0 133.243 3.780 -999.990 -999.990 1.332 ..P WKT 2010 06 01 12 29 55 31.3200 -97.3300 251.000 457.0 132.714 2.970 -999.990 -999.990 1.327 ..P WKT 2010 06 01 12 34 55 31.3200 -97.3300 251.000 30.0 152.754 2.980 -999.990 -999.990 1.528 ..P WKT 2010 06 01 12 39 55 31.3200 -97.3300 251.000 122.0 141.596 2.910 -999.990 -999.990 1.416 ..P WKT 2010 06 01 12 44 55 31.3200 -97.3300 251.000 457.0 133.471 2.400 -999.990 -999.990 1.335 ..P WKT 2010 06 01 12 54 55 31.3200 -97.3300 251.000 30.0 147.373 2.310 -999.990 -999.990 1.474 ..P WKT 2010 06 01 12 59 55 31.3200 -97.3300 251.000 122.0 143.845 3.900 -999.990 -999.990 1.438 ..P WKT 2010 06 01 13 04 55 31.3200 -97.3300 251.000 457.0 127.184 2.580 -999.990 -999.990 1.272 ..P WKT 2010 06 01 13 09 55 31.3200 -97.3300 251.000 30.0 147.430 2.030 -999.990 -999.990 1.474 ..P WKT 2010 06 01 13 14 55 31.3200 -97.3300 251.000 122.0 147.910 3.160 -999.990 -999.990 1.479 ..P WKT 2010 06 01 13 19 55 31.3200 -97.3300 251.000 457.0 127.921 2.100 -999.990 -999.990 1.279 ..P WKT 2010 06 01 13 29 55 31.3200 -97.3300 251.000 30.0 151.545 1.960 -999.990 -999.990 1.515 ..P WKT 2010 06 01 13 34 55 31.3200 -97.3300 251.000 122.0 145.087 2.850 -999.990 -999.990 1.451 ..P WKT 2010 06 01 13 39 55 31.3200 -97.3300 251.000 457.0 131.705 1.810 -999.990 -999.990 1.317 ..P WKT 2010 06 01 13 44 55 31.3200 -97.3300 251.000 30.0 144.484 3.540 -999.990 -999.990 1.445 ..P WKT 2010 06 01 13 49 55 31.3200 -97.3300 251.000 122.0 147.576 1.670 -999.990 -999.990 1.476 ..P WKT 2010 06 01 13 54 55 31.3200 -97.3300 251.000 457.0 126.569 2.050 -999.990 -999.990 1.266 ..P WKT 2010 06 01 14 04 55 31.3200 -97.3300 251.000 30.0 141.318 3.470 -999.990 -999.990 1.413 ..P WKT 2010 06 01 14 09 55 31.3200 -97.3300 251.000 122.0 151.321 1.880 -999.990 -999.990 1.513 ..P WKT 2010 06 01 14 14 55 31.3200 -97.3300 251.000 457.0 137.208 1.870 -999.990 -999.990 1.372 ..P WKT 2010 06 01 14 19 55 31.3200 -97.3300 251.000 30.0 144.164 4.800 -999.990 -999.990 1.442 ..P WKT 2010 06 01 14 24 55 31.3200 -97.3300 251.000 122.0 147.517 2.150 -999.990 -999.990 1.475 ..P WKT 2010 06 01 14 29 55 31.3200 -97.3300 251.000 457.0 125.906 2.080 -999.990 -999.990 1.259 ..P WKT 2010 06 01 14 39 55 31.3200 -97.3300 251.000 30.0 140.855 3.020 -999.990 -999.990 1.409 ..P WKT 2010 06 01 14 44 55 31.3200 -97.3300 251.000 122.0 136.636 2.640 -999.990 -999.990 1.366 ..P WKT 2010 06 01 14 49 55 31.3200 -97.3300 251.000 457.0 130.750 2.460 -999.990 -999.990 1.308 ..P WKT 2010 06 01 14 54 55 31.3200 -97.3300 251.000 30.0 140.411 2.510 -999.990 -999.990 1.404 ..P WKT 2010 06 01 14 59 55 31.3200 -97.3300 251.000 122.0 140.634 2.290 -999.990 -999.990 1.406 ..P WKT 2010 06 01 15 04 55 31.3200 -97.3300 251.000 457.0 128.357 2.450 -999.990 -999.990 1.284 ..P WKT 2010 06 01 15 14 55 31.3200 -97.3300 251.000 30.0 132.807 2.780 -999.990 -999.990 1.328 ..P WKT 2010 06 01 15 19 55 31.3200 -97.3300 251.000 122.0 138.984 2.930 -999.990 -999.990 1.390 ..P WKT 2010 06 01 15 24 55 31.3200 -97.3300 251.000 457.0 136.268 4.090 -999.990 -999.990 1.363 ..P WKT 2010 06 01 15 29 55 31.3200 -97.3300 251.000 30.0 146.063 3.010 -999.990 -999.990 1.461 ..P WKT 2010 06 01 15 34 55 31.3200 -97.3300 251.000 122.0 145.572 3.350 -999.990 -999.990 1.456 ..P WKT 2010 06 01 15 39 55 31.3200 -97.3300 251.000 457.0 138.126 4.070 -999.990 -999.990 1.381 ..P WKT 2010 06 01 15 49 55 31.3200 -97.3300 251.000 30.0 143.720 3.570 -999.990 -999.990 1.437 ..P WKT 2010 06 01 15 54 55 31.3200 -97.3300 251.000 122.0 150.505 5.300 -999.990 -999.990 1.505 ..P WKT 2010 06 01 15 59 55 31.3200 -97.3300 251.000 457.0 148.523 3.240 -999.990 -999.990 1.485 ..P WKT 2010 06 01 16 04 55 31.3200 -97.3300 251.000 30.0 140.971 3.100 -999.990 -999.990 1.410 ..P WKT 2010 06 01 16 09 55 31.3200 -97.3300 251.000 122.0 151.380 4.250 -999.990 -999.990 1.514 ..P WKT 2010 06 01 16 14 55 31.3200 -97.3300 251.000 457.0 148.561 4.160 -999.990 -999.990 1.486 ..P WKT 2010 06 01 16 24 55 31.3200 -97.3300 251.000 30.0 139.098 2.890 -999.990 -999.990 1.391 ..P WKT 2010 06 01 16 29 55 31.3200 -97.3300 251.000 122.0 145.831 3.940 -999.990 -999.990 1.458 ..P WKT 2010 06 01 16 34 55 31.3200 -97.3300 251.000 457.0 141.416 2.710 -999.990 -999.990 1.414 ..P WKT 2010 06 01 16 39 55 31.3200 -97.3300 251.000 30.0 136.162 2.930 -999.990 -999.990 1.362 ..P WKT 2010 06 01 16 44 55 31.3200 -97.3300 251.000 122.0 141.784 3.010 -999.990 -999.990 1.418 ..P WKT 2010 06 01 16 49 55 31.3200 -97.3300 251.000 457.0 139.457 2.910 -999.990 -999.990 1.395 ..P WKT 2010 06 01 17 04 55 31.3200 -97.3300 251.000 30.0 146.493 3.500 -999.990 -999.990 1.465 ..P WKT 2010 06 01 17 09 55 31.3200 -97.3300 251.000 122.0 136.031 7.150 -999.990 -999.990 1.360 ..P WKT 2010 06 01 17 14 55 31.3200 -97.3300 251.000 457.0 131.848 2.840 -999.990 -999.990 1.318 ..P WKT 2010 06 01 17 19 55 31.3200 -97.3300 251.000 30.0 132.551 3.680 -999.990 -999.990 1.326 ..P WKT 2010 06 01 17 24 55 31.3200 -97.3300 251.000 122.0 137.864 3.150 -999.990 -999.990 1.379 ..P WKT 2010 06 01 17 29 55 31.3200 -97.3300 251.000 457.0 126.973 2.520 -999.990 -999.990 1.270 ..P WKT 2010 06 01 17 39 55 31.3200 -97.3300 251.000 30.0 131.512 2.500 -999.990 -999.990 1.315 ..P WKT 2010 06 01 17 44 55 31.3200 -97.3300 251.000 122.0 136.327 3.420 -999.990 -999.990 1.363 ..P WKT 2010 06 01 17 49 55 31.3200 -97.3300 251.000 457.0 133.035 2.940 -999.990 -999.990 1.330 ..P WKT 2010 06 01 17 54 55 31.3200 -97.3300 251.000 30.0 135.057 3.110 -999.990 -999.990 1.351 ..P WKT 2010 06 01 17 59 55 31.3200 -97.3300 251.000 122.0 136.518 2.930 -999.990 -999.990 1.365 ..P WKT 2010 06 01 18 04 55 31.3200 -97.3300 251.000 457.0 137.981 2.240 -999.990 -999.990 1.380 ..P WKT 2010 06 01 18 14 55 31.3200 -97.3300 251.000 30.0 134.350 2.460 -999.990 -999.990 1.343 ..P WKT 2010 06 01 18 19 55 31.3200 -97.3300 251.000 122.0 144.093 3.550 -999.990 -999.990 1.441 ..P WKT 2010 06 01 18 24 55 31.3200 -97.3300 251.000 457.0 140.117 3.420 -999.990 -999.990 1.401 ..P WKT 2010 06 01 18 29 55 31.3200 -97.3300 251.000 30.0 137.260 2.510 -999.990 -999.990 1.373 ..P WKT 2010 06 01 18 34 55 31.3200 -97.3300 251.000 122.0 146.730 3.720 -999.990 -999.990 1.467 ..P WKT 2010 06 01 18 39 55 31.3200 -97.3300 251.000 457.0 136.027 2.680 -999.990 -999.990 1.360 ..P WKT 2010 06 01 18 49 55 31.3200 -97.3300 251.000 30.0 135.674 2.490 -999.990 -999.990 1.357 ..P WKT 2010 06 01 18 54 55 31.3200 -97.3300 251.000 122.0 140.143 2.420 -999.990 -999.990 1.401 ..P WKT 2010 06 01 18 59 55 31.3200 -97.3300 251.000 457.0 133.957 3.730 -999.990 -999.990 1.340 ..P WKT 2010 06 01 19 04 55 31.3200 -97.3300 251.000 30.0 132.818 2.260 -999.990 -999.990 1.328 ..P WKT 2010 06 01 19 09 55 31.3200 -97.3300 251.000 122.0 140.658 1.990 -999.990 -999.990 1.407 ..P WKT 2010 06 01 19 14 55 31.3200 -97.3300 251.000 457.0 136.714 3.580 -999.990 -999.990 1.367 ..P WKT 2010 06 01 19 24 55 31.3200 -97.3300 251.000 30.0 138.686 2.630 -999.990 -999.990 1.387 ..P WKT 2010 06 01 19 29 55 31.3200 -97.3300 251.000 122.0 138.710 2.170 -999.990 -999.990 1.387 ..P WKT 2010 06 01 19 34 55 31.3200 -97.3300 251.000 457.0 132.555 2.460 -999.990 -999.990 1.326 ..P WKT 2010 06 01 19 39 55 31.3200 -97.3300 251.000 30.0 135.527 2.380 -999.990 -999.990 1.355 ..P WKT 2010 06 01 19 44 55 31.3200 -97.3300 251.000 122.0 145.806 2.630 -999.990 -999.990 1.458 ..P WKT 2010 06 01 19 49 55 31.3200 -97.3300 251.000 457.0 134.872 2.370 -999.990 -999.990 1.349 ..P WKT 2010 06 01 19 59 55 31.3200 -97.3300 251.000 30.0 127.990 3.090 -999.990 -999.990 1.280 ..P WKT 2010 06 01 20 04 55 31.3200 -97.3300 251.000 122.0 137.533 2.580 -999.990 -999.990 1.375 ..P WKT 2010 06 01 20 09 55 31.3200 -97.3300 251.000 457.0 126.548 1.790 -999.990 -999.990 1.265 ..P WKT 2010 06 01 20 14 55 31.3200 -97.3300 251.000 30.0 131.593 2.760 -999.990 -999.990 1.316 ..P WKT 2010 06 01 20 19 55 31.3200 -97.3300 251.000 122.0 136.781 2.120 -999.990 -999.990 1.368 ..P WKT 2010 06 01 20 24 55 31.3200 -97.3300 251.000 457.0 130.151 2.690 -999.990 -999.990 1.302 ..P WKT 2010 06 01 20 34 55 31.3200 -97.3300 251.000 30.0 139.366 2.770 -999.990 -999.990 1.394 ..P WKT 2010 06 01 20 39 55 31.3200 -97.3300 251.000 122.0 135.790 2.360 -999.990 -999.990 1.358 ..P WKT 2010 06 01 20 44 55 31.3200 -97.3300 251.000 457.0 134.888 3.820 -999.990 -999.990 1.349 ..P WKT 2010 06 01 20 49 55 31.3200 -97.3300 251.000 30.0 134.972 2.580 -999.990 -999.990 1.350 ..P WKT 2010 06 01 20 54 55 31.3200 -97.3300 251.000 122.0 140.269 3.020 -999.990 -999.990 1.403 ..P WKT 2010 06 01 20 59 55 31.3200 -97.3300 251.000 457.0 129.363 3.030 -999.990 -999.990 1.294 ..P WKT 2010 06 01 21 09 55 31.3200 -97.3300 251.000 30.0 140.282 3.270 -999.990 -999.990 1.403 ..P WKT 2010 06 01 21 14 55 31.3200 -97.3300 251.000 122.0 140.125 3.420 -999.990 -999.990 1.401 ..P WKT 2010 06 01 21 19 55 31.3200 -97.3300 251.000 457.0 133.059 3.990 -999.990 -999.990 1.331 ..P WKT 2010 06 01 21 24 55 31.3200 -97.3300 251.000 30.0 140.799 3.460 -999.990 -999.990 1.408 ..P WKT 2010 06 01 21 29 55 31.3200 -97.3300 251.000 122.0 146.004 3.920 -999.990 -999.990 1.460 ..P WKT 2010 06 01 21 34 55 31.3200 -97.3300 251.000 457.0 136.252 3.880 -999.990 -999.990 1.363 ..P WKT 2010 06 01 21 44 55 31.3200 -97.3300 251.000 30.0 143.117 3.950 -999.990 -999.990 1.431 ..P WKT 2010 06 01 21 49 55 31.3200 -97.3300 251.000 122.0 152.260 3.720 -999.990 -999.990 1.523 ..P WKT 2010 06 01 21 54 55 31.3200 -97.3300 251.000 457.0 140.221 3.140 -999.990 -999.990 1.402 ..P WKT 2010 06 01 21 59 55 31.3200 -97.3300 251.000 30.0 139.479 2.980 -999.990 -999.990 1.395 ..P WKT 2010 06 01 22 04 55 31.3200 -97.3300 251.000 122.0 151.170 4.180 -999.990 -999.990 1.512 ..P WKT 2010 06 01 22 09 55 31.3200 -97.3300 251.000 457.0 144.494 2.270 -999.990 -999.990 1.445 ..P WKT 2010 06 01 22 19 55 31.3200 -97.3300 251.000 30.0 132.144 2.190 -999.990 -999.990 1.321 ..P WKT 2010 06 01 22 24 55 31.3200 -97.3300 251.000 122.0 139.197 4.300 -999.990 -999.990 1.392 ..P WKT 2010 06 01 22 29 55 31.3200 -97.3300 251.000 457.0 132.392 2.560 -999.990 -999.990 1.324 ..P WKT 2010 06 01 22 34 55 31.3200 -97.3300 251.000 30.0 140.014 2.220 -999.990 -999.990 1.400 ..P WKT 2010 06 01 22 39 55 31.3200 -97.3300 251.000 122.0 137.734 2.110 -999.990 -999.990 1.377 ..P WKT 2010 06 01 22 44 55 31.3200 -97.3300 251.000 457.0 137.435 3.420 -999.990 -999.990 1.374 ..P WKT 2010 06 01 22 54 55 31.3200 -97.3300 251.000 30.0 137.099 2.750 -999.990 -999.990 1.371 ..P WKT 2010 06 01 22 59 55 31.3200 -97.3300 251.000 122.0 144.709 2.280 -999.990 -999.990 1.447 ..P WKT 2010 06 01 23 04 55 31.3200 -97.3300 251.000 457.0 132.209 3.400 -999.990 -999.990 1.322 ..P WKT 2010 06 01 23 09 55 31.3200 -97.3300 251.000 30.0 137.272 2.400 -999.990 -999.990 1.373 ..P WKT 2010 06 01 23 14 55 31.3200 -97.3300 251.000 122.0 144.321 2.870 -999.990 -999.990 1.443 ..P WKT 2010 06 01 23 19 55 31.3200 -97.3300 251.000 457.0 135.214 2.690 -999.990 -999.990 1.352 ..P WKT 2010 06 01 23 29 55 31.3200 -97.3300 251.000 30.0 141.563 3.480 -999.990 -999.990 1.416 ..P WKT 2010 06 01 23 34 55 31.3200 -97.3300 251.000 122.0 144.833 3.940 -999.990 -999.990 1.448 ..P WKT 2010 06 01 23 39 55 31.3200 -97.3300 251.000 457.0 145.266 2.840 -999.990 -999.990 1.453 ..P WKT 2010 06 01 23 44 55 31.3200 -97.3300 251.000 30.0 140.593 3.120 -999.990 -999.990 1.406 ..P WKT 2010 06 01 23 49 55 31.3200 -97.3300 251.000 122.0 150.391 3.400 -999.990 -999.990 1.504 ..P WKT 2010 06 02 00 09 55 31.3200 -97.3300 251.000 457.0 132.801 2.840 -999.990 -999.990 1.328 ..P WKT 2010 06 02 00 10 25 31.3200 -97.3300 251.000 457.0 133.388 3.060 -999.990 -999.990 1.334 ..P WKT 2010 06 02 00 10 55 31.3200 -97.3300 251.000 457.0 133.267 2.580 -999.990 -999.990 1.333 ..P WKT 2010 06 02 00 11 25 31.3200 -97.3300 251.000 457.0 137.118 3.080 -999.990 -999.990 1.371 ..P WKT 2010 06 02 00 11 55 31.3200 -97.3300 251.000 457.0 138.273 2.820 -999.990 -999.990 1.383 ..P WKT 2010 06 02 00 12 25 31.3200 -97.3300 251.000 457.0 132.334 2.840 -999.990 -999.990 1.323 ..P WKT 2010 06 02 00 12 55 31.3200 -97.3300 251.000 457.0 129.942 2.900 -999.990 -999.990 1.299 ..P WKT 2010 06 02 00 13 25 31.3200 -97.3300 251.000 457.0 138.475 3.510 -999.990 -999.990 1.385 ..P WKT 2010 06 02 00 13 55 31.3200 -97.3300 251.000 457.0 137.502 2.670 -999.990 -999.990 1.375 ..P WKT 2010 06 02 00 14 25 31.3200 -97.3300 251.000 457.0 133.975 2.590 -999.990 -999.990 1.340 ..P WKT 2010 06 02 00 14 55 31.3200 -97.3300 251.000 457.0 136.548 2.870 -999.990 -999.990 1.365 ..P WKT 2010 06 02 00 19 55 31.3200 -97.3300 251.000 30.0 136.324 4.250 -999.990 -999.990 1.363 ..P WKT 2010 06 02 00 24 55 31.3200 -97.3300 251.000 122.0 138.226 3.710 -999.990 -999.990 1.382 ..P WKT 2010 06 02 00 29 55 31.3200 -97.3300 251.000 457.0 141.688 3.180 -999.990 -999.990 1.417 ..P WKT 2010 06 02 00 34 55 31.3200 -97.3300 251.000 30.0 135.368 3.000 -999.990 -999.990 1.354 ..P WKT 2010 06 02 00 39 55 31.3200 -97.3300 251.000 122.0 145.487 2.990 -999.990 -999.990 1.455 ..P WKT 2010 06 02 00 44 55 31.3200 -97.3300 251.000 457.0 135.628 3.370 -999.990 -999.990 1.356 ..P WKT 2010 06 02 00 54 55 31.3200 -97.3300 251.000 30.0 137.917 3.070 -999.990 -999.990 1.379 ..P WKT 2010 06 02 00 59 55 31.3200 -97.3300 251.000 122.0 141.986 2.950 -999.990 -999.990 1.420 ..P WKT 2010 06 02 01 04 55 31.3200 -97.3300 251.000 457.0 135.440 3.010 -999.990 -999.990 1.354 ..P WKT 2010 06 02 01 09 55 31.3200 -97.3300 251.000 30.0 131.303 3.800 -999.990 -999.990 1.313 ..P WKT 2010 06 02 01 14 55 31.3200 -97.3300 251.000 122.0 134.097 3.540 -999.990 -999.990 1.341 ..P WKT 2010 06 02 01 19 55 31.3200 -97.3300 251.000 457.0 133.356 2.830 -999.990 -999.990 1.334 ..P WKT 2010 06 02 01 29 55 31.3200 -97.3300 251.000 30.0 135.043 2.660 -999.990 -999.990 1.350 ..P WKT 2010 06 02 01 34 55 31.3200 -97.3300 251.000 122.0 138.318 3.510 -999.990 -999.990 1.383 ..P WKT 2010 06 02 01 39 55 31.3200 -97.3300 251.000 457.0 131.421 4.920 -999.990 -999.990 1.314 ..P WKT 2010 06 02 01 44 55 31.3200 -97.3300 251.000 30.0 139.497 5.900 -999.990 -999.990 1.395 ..P WKT 2010 06 02 01 49 55 31.3200 -97.3300 251.000 122.0 144.745 5.530 -999.990 -999.990 1.447 ..P WKT 2010 06 02 01 54 55 31.3200 -97.3300 251.000 457.0 149.144 3.290 -999.990 -999.990 1.491 ..P WKT 2010 06 02 02 04 55 31.3200 -97.3300 251.000 30.0 145.036 3.790 -999.990 -999.990 1.450 ..P WKT 2010 06 02 02 09 55 31.3200 -97.3300 251.000 122.0 139.075 4.900 -999.990 -999.990 1.391 ..P WKT 2010 06 02 02 14 55 31.3200 -97.3300 251.000 457.0 133.682 5.780 -999.990 -999.990 1.337 ..P WKT 2010 06 02 02 19 55 31.3200 -97.3300 251.000 30.0 139.849 4.580 -999.990 -999.990 1.398 ..P WKT 2010 06 02 02 24 55 31.3200 -97.3300 251.000 122.0 136.149 3.770 -999.990 -999.990 1.361 ..P WKT 2010 06 02 02 29 55 31.3200 -97.3300 251.000 457.0 137.522 4.770 -999.990 -999.990 1.375 ..P WKT 2010 06 02 02 39 55 31.3200 -97.3300 251.000 30.0 138.458 3.580 -999.990 -999.990 1.385 ..P WKT 2010 06 02 02 44 55 31.3200 -97.3300 251.000 122.0 136.893 4.600 -999.990 -999.990 1.369 ..P WKT 2010 06 02 02 49 55 31.3200 -97.3300 251.000 457.0 143.494 5.000 -999.990 -999.990 1.435 ..P WKT 2010 06 02 02 54 55 31.3200 -97.3300 251.000 30.0 131.516 3.940 -999.990 -999.990 1.315 ..P WKT 2010 06 02 02 59 55 31.3200 -97.3300 251.000 122.0 131.924 4.970 -999.990 -999.990 1.319 ..P WKT 2010 06 02 03 04 55 31.3200 -97.3300 251.000 457.0 132.051 2.960 -999.990 -999.990 1.321 ..P WKT 2010 06 02 03 14 55 31.3200 -97.3300 251.000 30.0 139.594 2.320 -999.990 -999.990 1.396 ..P WKT 2010 06 02 03 19 55 31.3200 -97.3300 251.000 122.0 139.137 2.710 -999.990 -999.990 1.391 ..P WKT 2010 06 02 03 24 55 31.3200 -97.3300 251.000 457.0 127.158 4.090 -999.990 -999.990 1.272 ..P WKT 2010 06 02 03 29 55 31.3200 -97.3300 251.000 30.0 140.048 3.380 -999.990 -999.990 1.400 ..P WKT 2010 06 02 03 34 55 31.3200 -97.3300 251.000 122.0 129.901 3.320 -999.990 -999.990 1.299 ..P WKT 2010 06 02 03 39 55 31.3200 -97.3300 251.000 457.0 125.375 3.520 -999.990 -999.990 1.254 ..P WKT 2010 06 02 03 49 55 31.3200 -97.3300 251.000 30.0 139.263 4.220 -999.990 -999.990 1.393 ..P WKT 2010 06 02 03 54 55 31.3200 -97.3300 251.000 122.0 131.150 4.370 -999.990 -999.990 1.312 ..P WKT 2010 06 02 03 59 55 31.3200 -97.3300 251.000 457.0 120.377 3.760 -999.990 -999.990 1.204 ..P WKT 2010 06 02 04 04 55 31.3200 -97.3300 251.000 30.0 135.409 3.160 -999.990 -999.990 1.354 ..P WKT 2010 06 02 04 09 55 31.3200 -97.3300 251.000 122.0 128.145 3.420 -999.990 -999.990 1.281 ..P WKT 2010 06 02 04 14 55 31.3200 -97.3300 251.000 457.0 123.547 2.560 -999.990 -999.990 1.235 ..P WKT 2010 06 02 04 24 55 31.3200 -97.3300 251.000 30.0 129.867 3.640 -999.990 -999.990 1.299 ..P WKT 2010 06 02 04 29 55 31.3200 -97.3300 251.000 122.0 133.635 2.480 -999.990 -999.990 1.336 ..P WKT 2010 06 02 04 34 55 31.3200 -97.3300 251.000 457.0 131.381 2.620 -999.990 -999.990 1.314 ..P WKT 2010 06 02 04 39 55 31.3200 -97.3300 251.000 30.0 137.946 4.230 -999.990 -999.990 1.379 ..P WKT 2010 06 02 04 44 55 31.3200 -97.3300 251.000 122.0 136.251 4.310 -999.990 -999.990 1.363 ..P WKT 2010 06 02 04 49 55 31.3200 -97.3300 251.000 457.0 129.941 2.560 -999.990 -999.990 1.299 ..P WKT 2010 06 02 05 04 55 31.3200 -97.3300 251.000 30.0 127.624 4.090 -999.990 -999.990 1.276 ..P WKT 2010 06 02 05 09 55 31.3200 -97.3300 251.000 122.0 134.650 2.720 -999.990 -999.990 1.347 ..P WKT 2010 06 02 05 14 55 31.3200 -97.3300 251.000 457.0 123.506 2.700 -999.990 -999.990 1.235 ..P WKT 2010 06 02 05 19 55 31.3200 -97.3300 251.000 30.0 131.647 3.080 -999.990 -999.990 1.316 ..P WKT 2010 06 02 05 24 55 31.3200 -97.3300 251.000 122.0 135.873 3.340 -999.990 -999.990 1.359 ..P WKT 2010 06 02 05 29 55 31.3200 -97.3300 251.000 457.0 120.828 4.360 -999.990 -999.990 1.208 ..P WKT 2010 06 02 05 39 55 31.3200 -97.3300 251.000 30.0 132.080 3.480 -999.990 -999.990 1.321 ..P WKT 2010 06 02 05 44 55 31.3200 -97.3300 251.000 122.0 134.359 3.450 -999.990 -999.990 1.344 ..P WKT 2010 06 02 05 49 55 31.3200 -97.3300 251.000 457.0 125.198 4.320 -999.990 -999.990 1.252 ..P WKT 2010 06 02 05 54 55 31.3200 -97.3300 251.000 30.0 122.456 3.710 -999.990 -999.990 1.225 ..P WKT 2010 06 02 05 59 55 31.3200 -97.3300 251.000 122.0 126.409 3.060 -999.990 -999.990 1.264 ..P WKT 2010 06 02 06 04 55 31.3200 -97.3300 251.000 457.0 121.159 3.550 -999.990 -999.990 1.212 ..P WKT 2010 06 02 06 14 55 31.3200 -97.3300 251.000 30.0 126.790 2.700 -999.990 -999.990 1.268 ..P WKT 2010 06 02 06 19 55 31.3200 -97.3300 251.000 122.0 126.797 3.270 -999.990 -999.990 1.268 ..P WKT 2010 06 02 06 24 55 31.3200 -97.3300 251.000 457.0 116.222 2.370 -999.990 -999.990 1.162 ..P WKT 2010 06 02 06 29 55 31.3200 -97.3300 251.000 30.0 127.090 3.030 -999.990 -999.990 1.271 ..P WKT 2010 06 02 06 34 55 31.3200 -97.3300 251.000 122.0 132.107 2.790 -999.990 -999.990 1.321 ..P WKT 2010 06 02 06 39 55 31.3200 -97.3300 251.000 457.0 127.383 1.840 -999.990 -999.990 1.274 ..P WKT 2010 06 02 06 49 55 31.3200 -97.3300 251.000 30.0 132.344 2.110 -999.990 -999.990 1.323 ..P WKT 2010 06 02 06 54 55 31.3200 -97.3300 251.000 122.0 129.788 2.770 -999.990 -999.990 1.298 ..P WKT 2010 06 02 06 59 55 31.3200 -97.3300 251.000 457.0 120.006 2.860 -999.990 -999.990 1.200 ..P WKT 2010 06 02 07 04 55 31.3200 -97.3300 251.000 30.0 122.734 2.540 -999.990 -999.990 1.227 ..P WKT 2010 06 02 07 09 55 31.3200 -97.3300 251.000 122.0 126.573 2.810 -999.990 -999.990 1.266 ..P WKT 2010 06 02 07 14 55 31.3200 -97.3300 251.000 457.0 113.465 1.910 -999.990 -999.990 1.135 ..P WKT 2010 06 02 07 24 55 31.3200 -97.3300 251.000 30.0 130.562 2.760 -999.990 -999.990 1.306 ..P WKT 2010 06 02 07 29 55 31.3200 -97.3300 251.000 122.0 135.624 2.250 -999.990 -999.990 1.356 ..P WKT 2010 06 02 07 34 55 31.3200 -97.3300 251.000 457.0 120.287 2.710 -999.990 -999.990 1.203 ..P WKT 2010 06 02 07 39 55 31.3200 -97.3300 251.000 30.0 134.366 2.450 -999.990 -999.990 1.344 ..P WKT 2010 06 02 07 44 55 31.3200 -97.3300 251.000 122.0 139.562 2.550 -999.990 -999.990 1.396 ..P WKT 2010 06 02 07 49 55 31.3200 -97.3300 251.000 457.0 121.878 1.780 -999.990 -999.990 1.219 ..P WKT 2010 06 02 07 59 55 31.3200 -97.3300 251.000 30.0 129.696 2.050 -999.990 -999.990 1.297 ..P WKT 2010 06 02 08 04 55 31.3200 -97.3300 251.000 122.0 135.224 3.530 -999.990 -999.990 1.352 ..P WKT 2010 06 02 08 09 55 31.3200 -97.3300 251.000 457.0 110.831 2.360 -999.990 -999.990 1.108 ..P WKT 2010 06 02 08 14 55 31.3200 -97.3300 251.000 30.0 130.487 2.780 -999.990 -999.990 1.305 ..P WKT 2010 06 02 08 19 55 31.3200 -97.3300 251.000 122.0 132.551 3.550 -999.990 -999.990 1.326 ..P WKT 2010 06 02 08 24 55 31.3200 -97.3300 251.000 457.0 113.159 2.950 -999.990 -999.990 1.132 ..P WKT 2010 06 02 08 34 55 31.3200 -97.3300 251.000 30.0 127.845 2.880 -999.990 -999.990 1.278 ..P WKT 2010 06 02 08 39 55 31.3200 -97.3300 251.000 122.0 134.372 3.270 -999.990 -999.990 1.344 ..P WKT 2010 06 02 08 44 55 31.3200 -97.3300 251.000 457.0 111.029 2.640 -999.990 -999.990 1.110 ..P WKT 2010 06 02 08 49 55 31.3200 -97.3300 251.000 30.0 131.658 4.050 -999.990 -999.990 1.317 ..P WKT 2010 06 02 08 54 55 31.3200 -97.3300 251.000 122.0 130.440 3.260 -999.990 -999.990 1.304 ..P WKT 2010 06 02 08 59 55 31.3200 -97.3300 251.000 457.0 112.780 4.110 -999.990 -999.990 1.128 ..P WKT 2010 06 02 09 09 55 31.3200 -97.3300 251.000 30.0 128.862 2.490 -999.990 -999.990 1.289 ..P WKT 2010 06 02 09 14 55 31.3200 -97.3300 251.000 122.0 138.691 2.970 -999.990 -999.990 1.387 ..P WKT 2010 06 02 09 19 55 31.3200 -97.3300 251.000 457.0 110.969 2.360 -999.990 -999.990 1.110 ..P WKT 2010 06 02 09 24 55 31.3200 -97.3300 251.000 30.0 134.048 3.370 -999.990 -999.990 1.340 ..P WKT 2010 06 02 09 29 55 31.3200 -97.3300 251.000 122.0 145.524 3.680 -999.990 -999.990 1.455 ..P WKT 2010 06 02 09 34 55 31.3200 -97.3300 251.000 457.0 112.304 2.400 -999.990 -999.990 1.123 ..P WKT 2010 06 02 09 44 55 31.3200 -97.3300 251.000 30.0 137.575 2.480 -999.990 -999.990 1.376 ..P WKT 2010 06 02 09 49 55 31.3200 -97.3300 251.000 122.0 145.298 2.550 -999.990 -999.990 1.453 ..P WKT 2010 06 02 09 54 55 31.3200 -97.3300 251.000 457.0 112.505 2.400 -999.990 -999.990 1.125 ..P WKT 2010 06 02 09 59 55 31.3200 -97.3300 251.000 30.0 138.691 2.310 -999.990 -999.990 1.387 ..P WKT 2010 06 02 10 04 55 31.3200 -97.3300 251.000 122.0 143.654 2.860 -999.990 -999.990 1.437 ..P WKT 2010 06 02 10 09 55 31.3200 -97.3300 251.000 457.0 110.609 4.040 -999.990 -999.990 1.106 ..P WKT 2010 06 02 10 19 55 31.3200 -97.3300 251.000 30.0 133.951 2.610 -999.990 -999.990 1.340 ..P WKT 2010 06 02 10 24 55 31.3200 -97.3300 251.000 122.0 150.389 2.310 -999.990 -999.990 1.504 ..P WKT 2010 06 02 10 29 55 31.3200 -97.3300 251.000 457.0 116.472 3.390 -999.990 -999.990 1.165 ..P WKT 2010 06 02 10 34 55 31.3200 -97.3300 251.000 30.0 143.634 3.510 -999.990 -999.990 1.436 ..P WKT 2010 06 02 10 39 55 31.3200 -97.3300 251.000 122.0 148.508 2.190 -999.990 -999.990 1.485 ..P WKT 2010 06 02 10 44 55 31.3200 -97.3300 251.000 457.0 130.011 2.250 -999.990 -999.990 1.300 ..P WKT 2010 06 02 10 54 55 31.3200 -97.3300 251.000 30.0 145.157 2.190 -999.990 -999.990 1.452 ..P WKT 2010 06 02 10 59 55 31.3200 -97.3300 251.000 122.0 148.830 3.040 -999.990 -999.990 1.488 ..P WKT 2010 06 02 11 04 55 31.3200 -97.3300 251.000 457.0 117.619 3.180 -999.990 -999.990 1.176 ..P WKT 2010 06 02 11 09 55 31.3200 -97.3300 251.000 30.0 140.243 2.940 -999.990 -999.990 1.402 ..P WKT 2010 06 02 11 14 55 31.3200 -97.3300 251.000 122.0 145.835 2.580 -999.990 -999.990 1.458 ..P WKT 2010 06 02 11 19 55 31.3200 -97.3300 251.000 457.0 121.921 2.500 -999.990 -999.990 1.219 ..P WKT 2010 06 02 11 29 55 31.3200 -97.3300 251.000 30.0 139.056 2.330 -999.990 -999.990 1.391 ..P WKT 2010 06 02 11 34 55 31.3200 -97.3300 251.000 122.0 143.049 3.250 -999.990 -999.990 1.430 ..P WKT 2010 06 02 11 39 55 31.3200 -97.3300 251.000 457.0 117.977 2.730 -999.990 -999.990 1.180 ..P WKT 2010 06 02 11 44 55 31.3200 -97.3300 251.000 30.0 144.177 2.960 -999.990 -999.990 1.442 ..P WKT 2010 06 02 11 49 55 31.3200 -97.3300 251.000 122.0 141.863 3.440 -999.990 -999.990 1.419 ..P WKT 2010 06 02 12 09 55 31.3200 -97.3300 251.000 457.0 120.530 2.760 -999.990 -999.990 1.205 ..P WKT 2010 06 02 12 10 25 31.3200 -97.3300 251.000 457.0 125.032 3.110 -999.990 -999.990 1.250 ..P WKT 2010 06 02 12 10 55 31.3200 -97.3300 251.000 457.0 128.849 3.290 -999.990 -999.990 1.288 ..P WKT 2010 06 02 12 11 25 31.3200 -97.3300 251.000 457.0 127.737 3.030 -999.990 -999.990 1.277 ..P WKT 2010 06 02 12 11 55 31.3200 -97.3300 251.000 457.0 125.940 3.050 -999.990 -999.990 1.259 ..P WKT 2010 06 02 12 12 25 31.3200 -97.3300 251.000 457.0 125.512 2.750 -999.990 -999.990 1.255 ..P WKT 2010 06 02 12 12 55 31.3200 -97.3300 251.000 457.0 129.604 2.880 -999.990 -999.990 1.296 ..P WKT 2010 06 02 12 13 25 31.3200 -97.3300 251.000 457.0 128.218 3.130 -999.990 -999.990 1.282 ..P WKT 2010 06 02 12 13 55 31.3200 -97.3300 251.000 457.0 130.803 2.670 -999.990 -999.990 1.308 ..P WKT 2010 06 02 12 14 25 31.3200 -97.3300 251.000 457.0 132.703 2.750 -999.990 -999.990 1.327 ..P WKT 2010 06 02 12 14 55 31.3200 -97.3300 251.000 457.0 131.043 3.010 -999.990 -999.990 1.310 ..P WKT 2010 06 02 12 19 55 31.3200 -97.3300 251.000 30.0 149.088 2.700 -999.990 -999.990 1.491 ..P WKT 2010 06 02 12 24 55 31.3200 -97.3300 251.000 122.0 135.636 3.370 -999.990 -999.990 1.356 ..P WKT 2010 06 02 12 29 55 31.3200 -97.3300 251.000 457.0 124.922 2.490 -999.990 -999.990 1.249 ..P WKT 2010 06 02 12 34 55 31.3200 -97.3300 251.000 30.0 158.851 4.030 -999.990 -999.990 1.589 ..P WKT 2010 06 02 12 39 55 31.3200 -97.3300 251.000 122.0 141.976 2.470 -999.990 -999.990 1.420 ..P WKT 2010 06 02 12 44 55 31.3200 -97.3300 251.000 457.0 124.416 2.830 -999.990 -999.990 1.244 ..P WKT 2010 06 02 12 54 55 31.3200 -97.3300 251.000 30.0 153.261 2.950 -999.990 -999.990 1.533 ..P WKT 2010 06 02 12 59 55 31.3200 -97.3300 251.000 122.0 136.813 2.570 -999.990 -999.990 1.368 ..P WKT 2010 06 02 13 04 55 31.3200 -97.3300 251.000 457.0 127.896 3.720 -999.990 -999.990 1.279 ..P WKT 2010 06 02 13 09 55 31.3200 -97.3300 251.000 30.0 155.537 3.160 -999.990 -999.990 1.555 ..P WKT 2010 06 02 13 14 55 31.3200 -97.3300 251.000 122.0 153.329 3.810 -999.990 -999.990 1.533 ..P WKT 2010 06 02 13 19 55 31.3200 -97.3300 251.000 457.0 126.751 3.580 -999.990 -999.990 1.268 ..P WKT 2010 06 02 13 29 55 31.3200 -97.3300 251.000 30.0 151.284 4.500 -999.990 -999.990 1.513 ..P WKT 2010 06 02 13 34 55 31.3200 -97.3300 251.000 122.0 147.081 5.780 -999.990 -999.990 1.471 ..P WKT 2010 06 02 13 39 55 31.3200 -97.3300 251.000 457.0 129.189 4.170 -999.990 -999.990 1.292 ..P WKT 2010 06 02 13 44 55 31.3200 -97.3300 251.000 30.0 140.868 4.300 -999.990 -999.990 1.409 ..P WKT 2010 06 02 13 49 55 31.3200 -97.3300 251.000 122.0 147.344 4.330 -999.990 -999.990 1.473 ..P WKT 2010 06 02 13 54 55 31.3200 -97.3300 251.000 457.0 128.905 4.010 -999.990 -999.990 1.289 ..P WKT 2010 06 02 14 04 55 31.3200 -97.3300 251.000 30.0 138.806 3.860 -999.990 -999.990 1.388 ..P WKT 2010 06 02 14 09 55 31.3200 -97.3300 251.000 122.0 143.327 3.610 -999.990 -999.990 1.433 ..P WKT 2010 06 02 14 14 55 31.3200 -97.3300 251.000 457.0 136.075 3.660 -999.990 -999.990 1.361 ..P WKT 2010 06 02 14 19 55 31.3200 -97.3300 251.000 30.0 142.511 3.840 -999.990 -999.990 1.425 ..P WKT 2010 06 02 14 24 55 31.3200 -97.3300 251.000 122.0 147.031 2.630 -999.990 -999.990 1.470 ..P WKT 2010 06 02 14 29 55 31.3200 -97.3300 251.000 457.0 138.684 2.440 -999.990 -999.990 1.387 ..P WKT 2010 06 02 14 39 55 31.3200 -97.3300 251.000 30.0 144.635 2.200 -999.990 -999.990 1.446 ..P WKT 2010 06 02 14 44 55 31.3200 -97.3300 251.000 122.0 139.495 3.740 -999.990 -999.990 1.395 ..P WKT 2010 06 02 14 49 55 31.3200 -97.3300 251.000 457.0 135.724 2.460 -999.990 -999.990 1.357 ..P WKT 2010 06 02 14 54 55 31.3200 -97.3300 251.000 30.0 135.512 2.250 -999.990 -999.990 1.355 ..P WKT 2010 06 02 14 59 55 31.3200 -97.3300 251.000 122.0 149.259 4.640 -999.990 -999.990 1.493 ..P WKT 2010 06 02 15 04 55 31.3200 -97.3300 251.000 457.0 139.467 2.530 -999.990 -999.990 1.395 ..P WKT 2010 06 02 15 14 55 31.3200 -97.3300 251.000 30.0 145.162 2.720 -999.990 -999.990 1.452 ..P WKT 2010 06 02 15 19 55 31.3200 -97.3300 251.000 122.0 147.785 2.650 -999.990 -999.990 1.478 ..P WKT 2010 06 02 15 24 55 31.3200 -97.3300 251.000 457.0 140.691 3.740 -999.990 -999.990 1.407 ..P WKT 2010 06 02 15 29 55 31.3200 -97.3300 251.000 30.0 138.387 3.020 -999.990 -999.990 1.384 ..P WKT 2010 06 02 15 34 55 31.3200 -97.3300 251.000 122.0 138.956 2.900 -999.990 -999.990 1.390 ..P WKT 2010 06 02 15 39 55 31.3200 -97.3300 251.000 457.0 131.180 4.100 -999.990 -999.990 1.312 ..P WKT 2010 06 02 15 49 55 31.3200 -97.3300 251.000 30.0 134.020 2.620 -999.990 -999.990 1.340 ..P WKT 2010 06 02 15 54 55 31.3200 -97.3300 251.000 122.0 141.900 2.810 -999.990 -999.990 1.419 ..P WKT 2010 06 02 15 59 55 31.3200 -97.3300 251.000 457.0 135.277 3.230 -999.990 -999.990 1.353 ..P WKT 2010 06 02 16 04 55 31.3200 -97.3300 251.000 30.0 135.769 3.570 -999.990 -999.990 1.358 ..P WKT 2010 06 02 16 09 55 31.3200 -97.3300 251.000 122.0 136.534 3.410 -999.990 -999.990 1.365 ..P WKT 2010 06 02 16 14 55 31.3200 -97.3300 251.000 457.0 133.331 3.270 -999.990 -999.990 1.333 ..P WKT 2010 06 02 16 24 55 31.3200 -97.3300 251.000 30.0 140.198 3.810 -999.990 -999.990 1.402 ..P WKT 2010 06 02 16 29 55 31.3200 -97.3300 251.000 122.0 146.025 3.750 -999.990 -999.990 1.460 ..P WKT 2010 06 02 16 34 55 31.3200 -97.3300 251.000 457.0 136.256 3.310 -999.990 -999.990 1.363 ..P WKT 2010 06 02 16 39 55 31.3200 -97.3300 251.000 30.0 139.210 4.510 -999.990 -999.990 1.392 ..P WKT 2010 06 02 16 44 55 31.3200 -97.3300 251.000 122.0 147.636 3.810 -999.990 -999.990 1.476 ..P WKT 2010 06 02 16 49 55 31.3200 -97.3300 251.000 457.0 142.792 3.090 -999.990 -999.990 1.428 ..P WKT 2010 06 02 17 04 55 31.3200 -97.3300 251.000 30.0 145.575 3.790 -999.990 -999.990 1.456 ..P WKT 2010 06 02 17 09 55 31.3200 -97.3300 251.000 122.0 149.252 4.380 -999.990 -999.990 1.493 ..P WKT 2010 06 02 17 14 55 31.3200 -97.3300 251.000 457.0 139.660 4.080 -999.990 -999.990 1.397 ..P WKT 2010 06 02 17 19 55 31.3200 -97.3300 251.000 30.0 140.738 3.340 -999.990 -999.990 1.407 ..P WKT 2010 06 02 17 24 55 31.3200 -97.3300 251.000 122.0 150.569 2.930 -999.990 -999.990 1.506 ..P WKT 2010 06 02 17 29 55 31.3200 -97.3300 251.000 457.0 139.884 2.610 -999.990 -999.990 1.399 ..P WKT 2010 06 02 17 39 55 31.3200 -97.3300 251.000 30.0 140.632 2.640 -999.990 -999.990 1.406 ..P WKT 2010 06 02 17 44 55 31.3200 -97.3300 251.000 122.0 135.379 4.610 -999.990 -999.990 1.354 ..P WKT 2010 06 02 17 49 55 31.3200 -97.3300 251.000 457.0 138.879 3.350 -999.990 -999.990 1.389 ..P WKT 2010 06 02 17 54 55 31.3200 -97.3300 251.000 30.0 137.456 2.730 -999.990 -999.990 1.375 ..P WKT 2010 06 02 17 59 55 31.3200 -97.3300 251.000 122.0 137.948 2.440 -999.990 -999.990 1.379 ..P WKT 2010 06 02 18 04 55 31.3200 -97.3300 251.000 457.0 132.969 4.270 -999.990 -999.990 1.330 ..P WKT 2010 06 02 18 14 55 31.3200 -97.3300 251.000 30.0 134.342 2.680 -999.990 -999.990 1.343 ..P WKT 2010 06 02 18 19 55 31.3200 -97.3300 251.000 122.0 137.139 3.490 -999.990 -999.990 1.371 ..P WKT 2010 06 02 18 24 55 31.3200 -97.3300 251.000 457.0 128.996 4.230 -999.990 -999.990 1.290 ..P WKT 2010 06 02 18 29 55 31.3200 -97.3300 251.000 30.0 130.425 5.330 -999.990 -999.990 1.304 ..P WKT 2010 06 02 18 34 55 31.3200 -97.3300 251.000 122.0 142.246 3.820 -999.990 -999.990 1.422 ..P WKT 2010 06 02 18 39 55 31.3200 -97.3300 251.000 457.0 135.744 3.580 -999.990 -999.990 1.357 ..P WKT 2010 06 02 18 49 55 31.3200 -97.3300 251.000 30.0 134.812 3.270 -999.990 -999.990 1.348 ..P WKT 2010 06 02 18 54 55 31.3200 -97.3300 251.000 122.0 146.945 3.750 -999.990 -999.990 1.469 ..P WKT 2010 06 02 18 59 55 31.3200 -97.3300 251.000 457.0 135.014 4.190 -999.990 -999.990 1.350 ..P WKT 2010 06 02 19 04 55 31.3200 -97.3300 251.000 30.0 143.264 4.410 -999.990 -999.990 1.433 ..P WKT 2010 06 02 19 09 55 31.3200 -97.3300 251.000 122.0 146.168 4.960 -999.990 -999.990 1.462 ..P WKT 2010 06 02 19 14 55 31.3200 -97.3300 251.000 457.0 134.229 5.080 -999.990 -999.990 1.342 ..P WKT 2010 06 02 19 24 55 31.3200 -97.3300 251.000 30.0 140.456 6.050 -999.990 -999.990 1.405 ..P WKT 2010 06 02 19 29 55 31.3200 -97.3300 251.000 122.0 146.439 4.940 -999.990 -999.990 1.464 ..P WKT 2010 06 02 19 34 55 31.3200 -97.3300 251.000 457.0 142.763 6.240 -999.990 -999.990 1.428 ..P WKT 2010 06 02 19 39 55 31.3200 -97.3300 251.000 30.0 136.705 8.440 -999.990 -999.990 1.367 ..P WKT 2010 06 02 19 44 55 31.3200 -97.3300 251.000 122.0 152.629 7.130 -999.990 -999.990 1.526 ..P WKT 2010 06 02 19 49 55 31.3200 -97.3300 251.000 457.0 146.571 5.000 -999.990 -999.990 1.466 ..P WKT 2010 06 02 19 59 55 31.3200 -97.3300 251.000 30.0 145.917 5.180 -999.990 -999.990 1.459 ..P WKT 2010 06 02 20 04 55 31.3200 -97.3300 251.000 122.0 155.380 6.960 -999.990 -999.990 1.554 ..P WKT 2010 06 02 20 09 55 31.3200 -97.3300 251.000 457.0 141.323 8.110 -999.990 -999.990 1.413 ..P WKT 2010 06 02 20 14 55 31.3200 -97.3300 251.000 30.0 144.066 6.540 -999.990 -999.990 1.441 ..P WKT 2010 06 02 20 19 55 31.3200 -97.3300 251.000 122.0 152.409 4.400 -999.990 -999.990 1.524 ..P WKT 2010 06 02 20 24 55 31.3200 -97.3300 251.000 457.0 147.452 4.090 -999.990 -999.990 1.475 ..P WKT 2010 06 02 20 34 55 31.3200 -97.3300 251.000 30.0 149.637 4.020 -999.990 -999.990 1.496 ..P WKT 2010 06 02 20 39 55 31.3200 -97.3300 251.000 122.0 154.679 4.630 -999.990 -999.990 1.547 ..P WKT 2010 06 02 20 44 55 31.3200 -97.3300 251.000 457.0 147.543 5.500 -999.990 -999.990 1.475 ..P WKT 2010 06 02 20 49 55 31.3200 -97.3300 251.000 30.0 149.926 6.670 -999.990 -999.990 1.499 ..P WKT 2010 06 02 20 54 55 31.3200 -97.3300 251.000 122.0 153.007 5.790 -999.990 -999.990 1.530 ..P WKT 2010 06 02 20 59 55 31.3200 -97.3300 251.000 457.0 146.712 4.650 -999.990 -999.990 1.467 ..P WKT 2010 06 02 21 09 55 31.3200 -97.3300 251.000 30.0 145.398 4.920 -999.990 -999.990 1.454 ..P WKT 2010 06 02 21 14 55 31.3200 -97.3300 251.000 122.0 154.298 5.910 -999.990 -999.990 1.543 ..P WKT 2010 06 02 21 19 55 31.3200 -97.3300 251.000 457.0 140.806 6.780 -999.990 -999.990 1.408 ..P WKT 2010 06 02 21 24 55 31.3200 -97.3300 251.000 30.0 142.428 5.700 -999.990 -999.990 1.424 ..P WKT 2010 06 02 21 29 55 31.3200 -97.3300 251.000 122.0 147.409 4.290 -999.990 -999.990 1.474 ..P WKT 2010 06 02 21 34 55 31.3200 -97.3300 251.000 457.0 138.116 4.110 -999.990 -999.990 1.381 ..P WKT 2010 06 02 21 44 55 31.3200 -97.3300 251.000 30.0 138.642 3.860 -999.990 -999.990 1.386 ..P WKT 2010 06 02 21 49 55 31.3200 -97.3300 251.000 122.0 145.661 4.330 -999.990 -999.990 1.457 ..P WKT 2010 06 02 21 54 55 31.3200 -97.3300 251.000 457.0 140.647 5.330 -999.990 -999.990 1.406 ..P WKT 2010 06 02 21 59 55 31.3200 -97.3300 251.000 30.0 138.431 4.060 -999.990 -999.990 1.384 ..P WKT 2010 06 02 22 04 55 31.3200 -97.3300 251.000 122.0 136.775 3.820 -999.990 -999.990 1.368 ..P WKT 2010 06 02 22 09 55 31.3200 -97.3300 251.000 457.0 130.642 4.020 -999.990 -999.990 1.306 ..P WKT 2010 06 02 22 19 55 31.3200 -97.3300 251.000 30.0 132.128 4.640 -999.990 -999.990 1.321 ..P WKT 2010 06 02 22 24 55 31.3200 -97.3300 251.000 122.0 126.314 4.100 -999.990 -999.990 1.263 ..P WKT 2010 06 02 22 29 55 31.3200 -97.3300 251.000 457.0 124.699 4.000 -999.990 -999.990 1.247 ..P WKT 2010 06 02 22 34 55 31.3200 -97.3300 251.000 30.0 121.963 4.430 -999.990 -999.990 1.220 ..P WKT 2010 06 02 22 39 55 31.3200 -97.3300 251.000 122.0 122.587 4.150 -999.990 -999.990 1.226 ..P WKT 2010 06 02 22 44 55 31.3200 -97.3300 251.000 457.0 118.453 4.620 -999.990 -999.990 1.185 ..P WKT 2010 06 02 22 54 55 31.3200 -97.3300 251.000 30.0 125.354 4.260 -999.990 -999.990 1.254 ..P WKT 2010 06 02 22 59 55 31.3200 -97.3300 251.000 122.0 136.949 4.260 -999.990 -999.990 1.369 ..P WKT 2010 06 02 23 04 55 31.3200 -97.3300 251.000 457.0 129.238 4.480 -999.990 -999.990 1.292 ..P WKT 2010 06 02 23 09 55 31.3200 -97.3300 251.000 30.0 128.942 4.120 -999.990 -999.990 1.289 ..P WKT 2010 06 02 23 14 55 31.3200 -97.3300 251.000 122.0 129.065 4.110 -999.990 -999.990 1.291 ..P WKT 2010 06 02 23 19 55 31.3200 -97.3300 251.000 457.0 123.733 4.320 -999.990 -999.990 1.237 ..P WKT 2010 06 02 23 29 55 31.3200 -97.3300 251.000 30.0 136.708 5.180 -999.990 -999.990 1.367 ..P WKT 2010 06 02 23 34 55 31.3200 -97.3300 251.000 122.0 142.006 4.730 -999.990 -999.990 1.420 ..P WKT 2010 06 02 23 39 55 31.3200 -97.3300 251.000 457.0 127.584 4.370 -999.990 -999.990 1.276 ..P WKT 2010 06 02 23 44 55 31.3200 -97.3300 251.000 30.0 140.994 5.350 -999.990 -999.990 1.410 ..P WKT 2010 06 02 23 49 55 31.3200 -97.3300 251.000 122.0 138.879 5.450 -999.990 -999.990 1.389 ..P WKT 2010 06 03 00 09 55 31.3200 -97.3300 251.000 457.0 132.725 5.170 -999.990 -999.990 1.327 ..P WKT 2010 06 03 00 10 25 31.3200 -97.3300 251.000 457.0 136.203 5.010 -999.990 -999.990 1.362 ..P WKT 2010 06 03 00 10 55 31.3200 -97.3300 251.000 457.0 139.121 4.460 -999.990 -999.990 1.391 ..P WKT 2010 06 03 00 11 25 31.3200 -97.3300 251.000 457.0 135.886 5.080 -999.990 -999.990 1.359 ..P WKT 2010 06 03 00 11 55 31.3200 -97.3300 251.000 457.0 127.338 4.590 -999.990 -999.990 1.273 ..P WKT 2010 06 03 00 12 25 31.3200 -97.3300 251.000 457.0 134.871 5.040 -999.990 -999.990 1.349 ..P WKT 2010 06 03 00 12 55 31.3200 -97.3300 251.000 457.0 132.335 4.580 -999.990 -999.990 1.323 ..P WKT 2010 06 03 00 13 25 31.3200 -97.3300 251.000 457.0 137.771 4.600 -999.990 -999.990 1.378 ..P WKT 2010 06 03 00 13 55 31.3200 -97.3300 251.000 457.0 131.599 6.190 -999.990 -999.990 1.316 ..P WKT 2010 06 03 00 14 25 31.3200 -97.3300 251.000 457.0 126.966 4.330 -999.990 -999.990 1.270 ..P WKT 2010 06 03 00 14 55 31.3200 -97.3300 251.000 457.0 129.185 5.490 -999.990 -999.990 1.292 ..P WKT 2010 06 03 00 19 55 31.3200 -97.3300 251.000 30.0 141.868 4.400 -999.990 -999.990 1.419 ..P WKT 2010 06 03 00 24 55 31.3200 -97.3300 251.000 122.0 135.951 4.090 -999.990 -999.990 1.360 ..P WKT 2010 06 03 00 29 55 31.3200 -97.3300 251.000 457.0 131.852 4.220 -999.990 -999.990 1.319 ..P WKT 2010 06 03 00 34 55 31.3200 -97.3300 251.000 30.0 147.193 4.310 -999.990 -999.990 1.472 ..P WKT 2010 06 03 00 39 55 31.3200 -97.3300 251.000 122.0 145.891 3.930 -999.990 -999.990 1.459 ..P WKT 2010 06 03 00 44 55 31.3200 -97.3300 251.000 457.0 136.758 4.290 -999.990 -999.990 1.368 ..P WKT 2010 06 03 00 54 55 31.3200 -97.3300 251.000 30.0 131.675 4.210 -999.990 -999.990 1.317 ..P WKT 2010 06 03 00 59 55 31.3200 -97.3300 251.000 122.0 114.887 3.590 -999.990 -999.990 1.149 ..P WKT 2010 06 03 01 04 55 31.3200 -97.3300 251.000 457.0 118.658 4.000 -999.990 -999.990 1.187 ..P WKT 2010 06 03 01 09 55 31.3200 -97.3300 251.000 30.0 118.233 3.800 -999.990 -999.990 1.182 ..P WKT 2010 06 03 01 14 55 31.3200 -97.3300 251.000 122.0 126.479 4.400 -999.990 -999.990 1.265 ..P WKT 2010 06 03 01 19 55 31.3200 -97.3300 251.000 457.0 120.460 3.810 -999.990 -999.990 1.205 ..P WKT 2010 06 03 01 29 55 31.3200 -97.3300 251.000 30.0 126.384 5.310 -999.990 -999.990 1.264 ..P WKT 2010 06 03 01 34 55 31.3200 -97.3300 251.000 122.0 129.375 3.810 -999.990 -999.990 1.294 ..P WKT 2010 06 03 01 39 55 31.3200 -97.3300 251.000 457.0 118.381 3.620 -999.990 -999.990 1.184 ..P WKT 2010 06 03 01 44 55 31.3200 -97.3300 251.000 30.0 126.408 4.290 -999.990 -999.990 1.264 ..P WKT 2010 06 03 01 49 55 31.3200 -97.3300 251.000 122.0 125.483 3.720 -999.990 -999.990 1.255 ..P WKT 2010 06 03 01 54 55 31.3200 -97.3300 251.000 457.0 122.881 3.380 -999.990 -999.990 1.229 ..P WKT 2010 06 03 02 04 55 31.3200 -97.3300 251.000 30.0 119.753 3.640 -999.990 -999.990 1.198 ..P WKT 2010 06 03 02 09 55 31.3200 -97.3300 251.000 122.0 124.543 3.730 -999.990 -999.990 1.245 ..P WKT 2010 06 03 02 14 55 31.3200 -97.3300 251.000 457.0 111.710 4.350 -999.990 -999.990 1.117 ..P WKT 2010 06 03 02 19 55 31.3200 -97.3300 251.000 30.0 117.619 4.380 -999.990 -999.990 1.176 ..P WKT 2010 06 03 02 24 55 31.3200 -97.3300 251.000 122.0 117.374 5.680 -999.990 -999.990 1.174 ..P WKT 2010 06 03 02 29 55 31.3200 -97.3300 251.000 457.0 108.737 3.880 -999.990 -999.990 1.087 ..P WKT 2010 06 03 02 39 55 31.3200 -97.3300 251.000 30.0 116.099 3.930 -999.990 -999.990 1.161 ..P WKT 2010 06 03 02 44 55 31.3200 -97.3300 251.000 122.0 120.909 3.690 -999.990 -999.990 1.209 ..P WKT 2010 06 03 02 49 55 31.3200 -97.3300 251.000 457.0 111.173 3.690 -999.990 -999.990 1.112 ..P WKT 2010 06 03 02 54 55 31.3200 -97.3300 251.000 30.0 122.696 3.470 -999.990 -999.990 1.227 ..P WKT 2010 06 03 02 59 55 31.3200 -97.3300 251.000 122.0 124.709 3.320 -999.990 -999.990 1.247 ..P WKT 2010 06 03 03 04 55 31.3200 -97.3300 251.000 457.0 112.735 3.880 -999.990 -999.990 1.127 ..P WKT 2010 06 03 03 14 55 31.3200 -97.3300 251.000 30.0 123.214 3.750 -999.990 -999.990 1.232 ..P WKT 2010 06 03 03 19 55 31.3200 -97.3300 251.000 122.0 125.387 3.150 -999.990 -999.990 1.254 ..P WKT 2010 06 03 03 24 55 31.3200 -97.3300 251.000 457.0 116.511 3.230 -999.990 -999.990 1.165 ..P WKT 2010 06 03 03 29 55 31.3200 -97.3300 251.000 30.0 128.614 3.960 -999.990 -999.990 1.286 ..P WKT 2010 06 03 03 34 55 31.3200 -97.3300 251.000 122.0 119.737 3.850 -999.990 -999.990 1.197 ..P WKT 2010 06 03 03 39 55 31.3200 -97.3300 251.000 457.0 115.755 4.600 -999.990 -999.990 1.158 ..P WKT 2010 06 03 03 49 55 31.3200 -97.3300 251.000 30.0 117.464 3.980 -999.990 -999.990 1.175 ..P WKT 2010 06 03 03 54 55 31.3200 -97.3300 251.000 122.0 121.195 3.170 -999.990 -999.990 1.212 ..P WKT 2010 06 03 03 59 55 31.3200 -97.3300 251.000 457.0 116.114 3.010 -999.990 -999.990 1.161 ..P WKT 2010 06 03 04 04 55 31.3200 -97.3300 251.000 30.0 120.405 4.230 -999.990 -999.990 1.204 ..P WKT 2010 06 03 04 09 55 31.3200 -97.3300 251.000 122.0 120.920 4.500 -999.990 -999.990 1.209 ..P WKT 2010 06 03 04 14 55 31.3200 -97.3300 251.000 457.0 119.336 3.040 -999.990 -999.990 1.193 ..P WKT 2010 06 03 04 24 55 31.3200 -97.3300 251.000 30.0 118.446 3.440 -999.990 -999.990 1.184 ..P WKT 2010 06 03 04 29 55 31.3200 -97.3300 251.000 122.0 120.958 2.610 -999.990 -999.990 1.210 ..P WKT 2010 06 03 04 34 55 31.3200 -97.3300 251.000 457.0 120.673 3.550 -999.990 -999.990 1.207 ..P WKT 2010 06 03 04 39 55 31.3200 -97.3300 251.000 30.0 129.620 4.280 -999.990 -999.990 1.296 ..P WKT 2010 06 03 04 44 55 31.3200 -97.3300 251.000 122.0 121.782 3.930 -999.990 -999.990 1.218 ..P WKT 2010 06 03 04 49 55 31.3200 -97.3300 251.000 457.0 123.735 3.440 -999.990 -999.990 1.237 ..P WKT 2010 06 03 05 04 55 31.3200 -97.3300 251.000 30.0 128.520 3.650 -999.990 -999.990 1.285 ..P WKT 2010 06 03 05 09 55 31.3200 -97.3300 251.000 122.0 127.628 4.220 -999.990 -999.990 1.276 ..P WKT 2010 06 03 05 14 55 31.3200 -97.3300 251.000 457.0 120.582 4.960 -999.990 -999.990 1.206 ..P WKT 2010 06 03 05 19 55 31.3200 -97.3300 251.000 30.0 133.957 2.950 -999.990 -999.990 1.340 ..P WKT 2010 06 03 05 24 55 31.3200 -97.3300 251.000 122.0 125.791 3.120 -999.990 -999.990 1.258 ..P WKT 2010 06 03 05 29 55 31.3200 -97.3300 251.000 457.0 112.311 2.860 -999.990 -999.990 1.123 ..P WKT 2010 06 03 05 39 55 31.3200 -97.3300 251.000 30.0 128.279 3.200 -999.990 -999.990 1.283 ..P WKT 2010 06 03 05 44 55 31.3200 -97.3300 251.000 122.0 126.674 2.800 -999.990 -999.990 1.267 ..P WKT 2010 06 03 05 49 55 31.3200 -97.3300 251.000 457.0 117.797 3.970 -999.990 -999.990 1.178 ..P WKT 2010 06 03 05 54 55 31.3200 -97.3300 251.000 30.0 124.307 2.630 -999.990 -999.990 1.243 ..P WKT 2010 06 03 05 59 55 31.3200 -97.3300 251.000 122.0 126.619 2.240 -999.990 -999.990 1.266 ..P WKT 2010 06 03 06 04 55 31.3200 -97.3300 251.000 457.0 118.861 2.230 -999.990 -999.990 1.189 ..P WKT 2010 06 03 06 14 55 31.3200 -97.3300 251.000 30.0 127.882 2.860 -999.990 -999.990 1.279 ..P WKT 2010 06 03 06 19 55 31.3200 -97.3300 251.000 122.0 125.639 2.100 -999.990 -999.990 1.256 ..P WKT 2010 06 03 06 24 55 31.3200 -97.3300 251.000 457.0 125.075 2.650 -999.990 -999.990 1.251 ..P WKT 2010 06 03 06 29 55 31.3200 -97.3300 251.000 30.0 126.469 2.950 -999.990 -999.990 1.265 ..P WKT 2010 06 03 06 34 55 31.3200 -97.3300 251.000 122.0 126.463 1.940 -999.990 -999.990 1.265 ..P WKT 2010 06 03 06 39 55 31.3200 -97.3300 251.000 457.0 121.983 2.400 -999.990 -999.990 1.220 ..P WKT 2010 06 03 06 49 55 31.3200 -97.3300 251.000 30.0 120.773 2.470 -999.990 -999.990 1.208 ..P WKT 2010 06 03 06 54 55 31.3200 -97.3300 251.000 122.0 116.492 2.230 -999.990 -999.990 1.165 ..P WKT 2010 06 03 06 59 55 31.3200 -97.3300 251.000 457.0 110.532 3.780 -999.990 -999.990 1.105 ..P WKT 2010 06 03 07 04 55 31.3200 -97.3300 251.000 30.0 116.322 4.320 -999.990 -999.990 1.163 ..P WKT 2010 06 03 07 09 55 31.3200 -97.3300 251.000 122.0 118.335 3.770 -999.990 -999.990 1.183 ..P WKT 2010 06 03 07 14 55 31.3200 -97.3300 251.000 457.0 111.396 3.160 -999.990 -999.990 1.114 ..P WKT 2010 06 03 07 24 55 31.3200 -97.3300 251.000 30.0 115.562 2.950 -999.990 -999.990 1.156 ..P WKT 2010 06 03 07 29 55 31.3200 -97.3300 251.000 122.0 113.099 4.030 -999.990 -999.990 1.131 ..P WKT 2010 06 03 07 34 55 31.3200 -97.3300 251.000 457.0 109.378 4.210 -999.990 -999.990 1.094 ..P WKT 2010 06 03 07 39 55 31.3200 -97.3300 251.000 30.0 113.209 3.670 -999.990 -999.990 1.132 ..P WKT 2010 06 03 07 44 55 31.3200 -97.3300 251.000 122.0 114.243 2.640 -999.990 -999.990 1.142 ..P WKT 2010 06 03 07 49 55 31.3200 -97.3300 251.000 457.0 107.725 3.780 -999.990 -999.990 1.077 ..P WKT 2010 06 03 07 59 55 31.3200 -97.3300 251.000 30.0 108.594 2.280 -999.990 -999.990 1.086 ..P WKT 2010 06 03 08 04 55 31.3200 -97.3300 251.000 122.0 117.240 2.700 -999.990 -999.990 1.172 ..P WKT 2010 06 03 08 09 55 31.3200 -97.3300 251.000 457.0 111.760 3.120 -999.990 -999.990 1.118 ..P WKT 2010 06 03 08 14 55 31.3200 -97.3300 251.000 30.0 119.568 3.530 -999.990 -999.990 1.196 ..P WKT 2010 06 03 08 19 55 31.3200 -97.3300 251.000 122.0 113.948 2.980 -999.990 -999.990 1.139 ..P WKT 2010 06 03 08 24 55 31.3200 -97.3300 251.000 457.0 111.965 1.740 -999.990 -999.990 1.120 ..P WKT 2010 06 03 08 34 55 31.3200 -97.3300 251.000 30.0 116.210 2.520 -999.990 -999.990 1.162 ..P WKT 2010 06 03 08 39 55 31.3200 -97.3300 251.000 122.0 114.607 2.830 -999.990 -999.990 1.146 ..P WKT 2010 06 03 08 44 55 31.3200 -97.3300 251.000 457.0 116.080 4.670 -999.990 -999.990 1.161 ..P WKT 2010 06 03 08 49 55 31.3200 -97.3300 251.000 30.0 119.233 4.510 -999.990 -999.990 1.192 ..P WKT 2010 06 03 08 54 55 31.3200 -97.3300 251.000 122.0 120.007 4.850 -999.990 -999.990 1.200 ..P WKT 2010 06 03 08 59 55 31.3200 -97.3300 251.000 457.0 113.229 2.740 -999.990 -999.990 1.132 ..P WKT 2010 06 03 09 09 55 31.3200 -97.3300 251.000 30.0 124.747 2.620 -999.990 -999.990 1.247 ..P WKT 2010 06 03 09 14 55 31.3200 -97.3300 251.000 122.0 127.099 3.700 -999.990 -999.990 1.271 ..P WKT 2010 06 03 09 19 55 31.3200 -97.3300 251.000 457.0 113.788 5.000 -999.990 -999.990 1.138 ..P WKT 2010 06 03 09 24 55 31.3200 -97.3300 251.000 30.0 121.176 6.640 -999.990 -999.990 1.212 ..P WKT 2010 06 03 09 29 55 31.3200 -97.3300 251.000 122.0 117.375 4.850 -999.990 -999.990 1.174 ..P WKT 2010 06 03 09 34 55 31.3200 -97.3300 251.000 457.0 109.938 3.100 -999.990 -999.990 1.099 ..P WKT 2010 06 03 09 44 55 31.3200 -97.3300 251.000 30.0 121.476 4.670 -999.990 -999.990 1.215 ..P WKT 2010 06 03 09 49 55 31.3200 -97.3300 251.000 122.0 121.710 4.970 -999.990 -999.990 1.217 ..P WKT 2010 06 03 09 54 55 31.3200 -97.3300 251.000 457.0 115.512 5.890 -999.990 -999.990 1.155 ..P WKT 2010 06 03 09 59 55 31.3200 -97.3300 251.000 30.0 117.984 4.710 -999.990 -999.990 1.180 ..P WKT 2010 06 03 10 04 55 31.3200 -97.3300 251.000 122.0 125.491 3.970 -999.990 -999.990 1.255 ..P WKT 2010 06 03 10 09 55 31.3200 -97.3300 251.000 457.0 109.223 3.480 -999.990 -999.990 1.092 ..P WKT 2010 06 03 10 19 55 31.3200 -97.3300 251.000 30.0 125.356 2.610 -999.990 -999.990 1.254 ..P WKT 2010 06 03 10 24 55 31.3200 -97.3300 251.000 122.0 130.625 4.560 -999.990 -999.990 1.306 ..P WKT 2010 06 03 10 29 55 31.3200 -97.3300 251.000 457.0 121.350 4.230 -999.990 -999.990 1.214 ..P WKT 2010 06 03 10 34 55 31.3200 -97.3300 251.000 30.0 125.221 3.460 -999.990 -999.990 1.252 ..P WKT 2010 06 03 10 39 55 31.3200 -97.3300 251.000 122.0 128.252 3.110 -999.990 -999.990 1.283 ..P WKT 2010 06 03 10 44 55 31.3200 -97.3300 251.000 457.0 115.342 1.880 -999.990 -999.990 1.153 ..P WKT 2010 06 03 10 54 55 31.3200 -97.3300 251.000 30.0 119.128 2.800 -999.990 -999.990 1.191 ..P WKT 2010 06 03 10 59 55 31.3200 -97.3300 251.000 122.0 120.162 2.060 -999.990 -999.990 1.202 ..P WKT 2010 06 03 11 04 55 31.3200 -97.3300 251.000 457.0 113.365 2.320 -999.990 -999.990 1.134 ..P WKT 2010 06 03 11 09 55 31.3200 -97.3300 251.000 30.0 125.305 3.120 -999.990 -999.990 1.253 ..P WKT 2010 06 03 11 14 55 31.3200 -97.3300 251.000 122.0 122.144 3.570 -999.990 -999.990 1.221 ..P WKT 2010 06 03 11 19 55 31.3200 -97.3300 251.000 457.0 108.636 2.570 -999.990 -999.990 1.086 ..P WKT 2010 06 03 11 29 55 31.3200 -97.3300 251.000 30.0 119.510 2.900 -999.990 -999.990 1.195 ..P WKT 2010 06 03 11 34 55 31.3200 -97.3300 251.000 122.0 121.241 3.320 -999.990 -999.990 1.212 ..P WKT 2010 06 03 11 39 55 31.3200 -97.3300 251.000 457.0 115.281 2.430 -999.990 -999.990 1.153 ..P WKT 2010 06 03 11 44 55 31.3200 -97.3300 251.000 30.0 124.982 4.730 -999.990 -999.990 1.250 ..P WKT 2010 06 03 11 49 55 31.3200 -97.3300 251.000 122.0 118.882 2.930 -999.990 -999.990 1.189 ..P WKT 2010 06 03 12 09 55 31.3200 -97.3300 251.000 457.0 113.634 3.800 -999.990 -999.990 1.136 ..P WKT 2010 06 03 12 10 25 31.3200 -97.3300 251.000 457.0 114.112 3.220 -999.990 -999.990 1.141 ..P WKT 2010 06 03 12 10 55 31.3200 -97.3300 251.000 457.0 106.759 3.330 -999.990 -999.990 1.068 ..P WKT 2010 06 03 12 11 25 31.3200 -97.3300 251.000 457.0 108.915 3.630 -999.990 -999.990 1.089 ..P WKT 2010 06 03 12 11 55 31.3200 -97.3300 251.000 457.0 114.985 2.730 -999.990 -999.990 1.150 ..P WKT 2010 06 03 12 12 25 31.3200 -97.3300 251.000 457.0 110.848 3.300 -999.990 -999.990 1.108 ..P WKT 2010 06 03 12 12 55 31.3200 -97.3300 251.000 457.0 114.542 4.660 -999.990 -999.990 1.145 ..P WKT 2010 06 03 12 13 25 31.3200 -97.3300 251.000 457.0 117.257 3.400 -999.990 -999.990 1.173 ..P WKT 2010 06 03 12 13 55 31.3200 -97.3300 251.000 457.0 112.421 2.800 -999.990 -999.990 1.124 ..P WKT 2010 06 03 12 14 25 31.3200 -97.3300 251.000 457.0 113.737 2.950 -999.990 -999.990 1.137 ..P WKT 2010 06 03 12 14 55 31.3200 -97.3300 251.000 457.0 113.516 2.850 -999.990 -999.990 1.135 ..P WKT 2010 06 03 12 19 55 31.3200 -97.3300 251.000 30.0 124.164 4.420 -999.990 -999.990 1.242 ..P WKT 2010 06 03 12 24 55 31.3200 -97.3300 251.000 122.0 129.079 2.690 -999.990 -999.990 1.291 ..P WKT 2010 06 03 12 29 55 31.3200 -97.3300 251.000 457.0 114.138 4.350 -999.990 -999.990 1.141 ..P WKT 2010 06 03 12 34 55 31.3200 -97.3300 251.000 30.0 129.820 3.080 -999.990 -999.990 1.298 ..P WKT 2010 06 03 12 39 55 31.3200 -97.3300 251.000 122.0 128.583 2.800 -999.990 -999.990 1.286 ..P WKT 2010 06 03 12 44 55 31.3200 -97.3300 251.000 457.0 119.516 3.060 -999.990 -999.990 1.195 ..P WKT 2010 06 03 12 54 55 31.3200 -97.3300 251.000 30.0 130.517 2.330 -999.990 -999.990 1.305 ..P WKT 2010 06 03 12 59 55 31.3200 -97.3300 251.000 122.0 126.817 4.550 -999.990 -999.990 1.268 ..P WKT 2010 06 03 13 04 55 31.3200 -97.3300 251.000 457.0 107.454 4.260 -999.990 -999.990 1.075 ..P WKT 2010 06 03 13 09 55 31.3200 -97.3300 251.000 30.0 126.406 2.700 -999.990 -999.990 1.264 ..P WKT 2010 06 03 13 14 55 31.3200 -97.3300 251.000 122.0 132.772 2.690 -999.990 -999.990 1.328 ..P WKT 2010 06 03 13 19 55 31.3200 -97.3300 251.000 457.0 118.165 3.460 -999.990 -999.990 1.182 ..P WKT 2010 06 03 13 29 55 31.3200 -97.3300 251.000 30.0 125.984 2.330 -999.990 -999.990 1.260 ..P WKT 2010 06 03 13 34 55 31.3200 -97.3300 251.000 122.0 129.673 3.370 -999.990 -999.990 1.297 ..P WKT 2010 06 03 13 39 55 31.3200 -97.3300 251.000 457.0 123.296 2.700 -999.990 -999.990 1.233 ..P WKT 2010 06 03 13 44 55 31.3200 -97.3300 251.000 30.0 128.664 2.550 -999.990 -999.990 1.287 ..P WKT 2010 06 03 13 49 55 31.3200 -97.3300 251.000 122.0 132.074 4.470 -999.990 -999.990 1.321 ..P WKT 2010 06 03 13 54 55 31.3200 -97.3300 251.000 457.0 116.188 2.690 -999.990 -999.990 1.162 ..P WKT 2010 06 03 14 04 55 31.3200 -97.3300 251.000 30.0 126.884 2.740 -999.990 -999.990 1.269 ..P WKT 2010 06 03 14 09 55 31.3200 -97.3300 251.000 122.0 137.524 4.000 -999.990 -999.990 1.375 ..P WKT 2010 06 03 14 14 55 31.3200 -97.3300 251.000 457.0 113.490 2.790 -999.990 -999.990 1.135 ..P WKT 2010 06 03 14 19 55 31.3200 -97.3300 251.000 30.0 135.596 2.810 -999.990 -999.990 1.356 ..P WKT 2010 06 03 14 24 55 31.3200 -97.3300 251.000 122.0 141.762 4.320 -999.990 -999.990 1.418 ..P WKT 2010 06 03 14 29 55 31.3200 -97.3300 251.000 457.0 117.169 3.380 -999.990 -999.990 1.172 ..P WKT 2010 06 03 14 39 55 31.3200 -97.3300 251.000 30.0 130.001 3.410 -999.990 -999.990 1.300 ..P WKT 2010 06 03 14 44 55 31.3200 -97.3300 251.000 122.0 140.301 2.100 -999.990 -999.990 1.403 ..P WKT 2010 06 03 14 49 55 31.3200 -97.3300 251.000 457.0 113.272 2.100 -999.990 -999.990 1.133 ..P WKT 2010 06 03 14 54 55 31.3200 -97.3300 251.000 30.0 134.897 2.860 -999.990 -999.990 1.349 ..P WKT 2010 06 03 14 59 55 31.3200 -97.3300 251.000 122.0 129.679 3.060 -999.990 -999.990 1.297 ..P WKT 2010 06 03 15 04 55 31.3200 -97.3300 251.000 457.0 108.522 3.220 -999.990 -999.990 1.085 ..P WKT 2010 06 03 15 14 55 31.3200 -97.3300 251.000 30.0 133.617 4.420 -999.990 -999.990 1.336 ..P WKT 2010 06 03 15 19 55 31.3200 -97.3300 251.000 122.0 133.312 2.720 -999.990 -999.990 1.333 ..P WKT 2010 06 03 15 24 55 31.3200 -97.3300 251.000 457.0 112.035 3.290 -999.990 -999.990 1.120 ..P WKT 2010 06 03 15 29 55 31.3200 -97.3300 251.000 30.0 129.486 2.730 -999.990 -999.990 1.295 ..P WKT 2010 06 03 15 34 55 31.3200 -97.3300 251.000 122.0 135.332 3.160 -999.990 -999.990 1.353 ..P WKT 2010 06 03 15 39 55 31.3200 -97.3300 251.000 457.0 106.507 2.360 -999.990 -999.990 1.065 ..P WKT 2010 06 03 15 49 55 31.3200 -97.3300 251.000 30.0 127.946 2.780 -999.990 -999.990 1.279 ..P WKT 2010 06 03 15 54 55 31.3200 -97.3300 251.000 122.0 140.742 3.020 -999.990 -999.990 1.407 ..P WKT 2010 06 03 15 59 55 31.3200 -97.3300 251.000 457.0 105.727 3.140 -999.990 -999.990 1.057 ..P WKT 2010 06 03 16 04 55 31.3200 -97.3300 251.000 30.0 125.792 2.920 -999.990 -999.990 1.258 ..P WKT 2010 06 03 16 09 55 31.3200 -97.3300 251.000 122.0 139.147 3.040 -999.990 -999.990 1.391 ..P WKT 2010 06 03 16 14 55 31.3200 -97.3300 251.000 457.0 107.488 3.480 -999.990 -999.990 1.075 ..P WKT 2010 06 03 16 24 55 31.3200 -97.3300 251.000 30.0 136.794 3.710 -999.990 -999.990 1.368 ..P WKT 2010 06 03 16 29 55 31.3200 -97.3300 251.000 122.0 143.658 2.790 -999.990 -999.990 1.437 ..P WKT 2010 06 03 16 34 55 31.3200 -97.3300 251.000 457.0 111.380 3.690 -999.990 -999.990 1.114 ..P WKT 2010 06 03 16 39 55 31.3200 -97.3300 251.000 30.0 135.719 3.090 -999.990 -999.990 1.357 ..P WKT 2010 06 03 16 44 55 31.3200 -97.3300 251.000 122.0 147.336 3.840 -999.990 -999.990 1.473 ..P WKT 2010 06 03 16 49 55 31.3200 -97.3300 251.000 457.0 119.811 3.170 -999.990 -999.990 1.198 ..P WKT 2010 06 03 17 04 55 31.3200 -97.3300 251.000 30.0 134.243 2.590 -999.990 -999.990 1.342 ..P WKT 2010 06 03 17 09 55 31.3200 -97.3300 251.000 122.0 143.409 4.060 -999.990 -999.990 1.434 ..P WKT 2010 06 03 17 14 55 31.3200 -97.3300 251.000 457.0 112.876 3.480 -999.990 -999.990 1.129 ..P WKT 2010 06 03 17 19 55 31.3200 -97.3300 251.000 30.0 137.696 2.810 -999.990 -999.990 1.377 ..P WKT 2010 06 03 17 24 55 31.3200 -97.3300 251.000 122.0 142.668 2.410 -999.990 -999.990 1.427 ..P WKT 2010 06 03 17 29 55 31.3200 -97.3300 251.000 457.0 109.619 2.180 -999.990 -999.990 1.096 ..P WKT 2010 06 03 17 39 55 31.3200 -97.3300 251.000 30.0 137.849 2.430 -999.990 -999.990 1.378 ..P WKT 2010 06 03 17 44 55 31.3200 -97.3300 251.000 122.0 142.376 2.630 -999.990 -999.990 1.424 ..P WKT 2010 06 03 17 49 55 31.3200 -97.3300 251.000 457.0 111.121 3.840 -999.990 -999.990 1.111 ..P WKT 2010 06 03 17 54 55 31.3200 -97.3300 251.000 30.0 141.366 2.880 -999.990 -999.990 1.414 ..P WKT 2010 06 03 17 59 55 31.3200 -97.3300 251.000 122.0 148.690 3.320 -999.990 -999.990 1.487 ..P WKT 2010 06 03 18 04 55 31.3200 -97.3300 251.000 457.0 105.134 1.850 -999.990 -999.990 1.051 ..P WKT 2010 06 03 18 14 55 31.3200 -97.3300 251.000 30.0 144.619 2.110 -999.990 -999.990 1.446 ..P WKT 2010 06 03 18 19 55 31.3200 -97.3300 251.000 122.0 149.665 2.680 -999.990 -999.990 1.497 ..P WKT 2010 06 03 18 24 55 31.3200 -97.3300 251.000 457.0 148.561 2.770 -999.990 -999.990 1.486 ..P WKT 2010 06 03 18 29 55 31.3200 -97.3300 251.000 30.0 142.146 2.980 -999.990 -999.990 1.421 ..P WKT 2010 06 03 18 34 55 31.3200 -97.3300 251.000 122.0 148.310 3.000 -999.990 -999.990 1.483 ..P WKT 2010 06 03 18 39 55 31.3200 -97.3300 251.000 457.0 152.797 3.220 -999.990 -999.990 1.528 ..P WKT 2010 06 03 18 49 55 31.3200 -97.3300 251.000 30.0 154.422 2.570 -999.990 -999.990 1.544 ..P WKT 2010 06 03 18 54 55 31.3200 -97.3300 251.000 122.0 153.239 3.090 -999.990 -999.990 1.532 ..P WKT 2010 06 03 18 59 55 31.3200 -97.3300 251.000 457.0 157.087 3.770 -999.990 -999.990 1.571 ..P WKT 2010 06 03 19 04 55 31.3200 -97.3300 251.000 30.0 158.698 2.820 -999.990 -999.990 1.587 ..P WKT 2010 06 03 19 09 55 31.3200 -97.3300 251.000 122.0 155.418 3.850 -999.990 -999.990 1.554 ..P WKT 2010 06 03 19 14 55 31.3200 -97.3300 251.000 457.0 155.911 4.290 -999.990 -999.990 1.559 ..P WKT 2010 06 03 19 24 55 31.3200 -97.3300 251.000 30.0 152.945 3.040 -999.990 -999.990 1.529 ..P WKT 2010 06 03 19 29 55 31.3200 -97.3300 251.000 122.0 161.924 2.380 -999.990 -999.990 1.619 ..P WKT 2010 06 03 19 34 55 31.3200 -97.3300 251.000 457.0 163.775 2.630 -999.990 -999.990 1.638 ..P WKT 2010 06 03 19 39 55 31.3200 -97.3300 251.000 30.0 153.607 3.430 -999.990 -999.990 1.536 ..P WKT 2010 06 03 19 44 55 31.3200 -97.3300 251.000 122.0 159.791 2.330 -999.990 -999.990 1.598 ..P WKT 2010 06 03 19 49 55 31.3200 -97.3300 251.000 457.0 168.908 2.890 -999.990 -999.990 1.689 ..P WKT 2010 06 03 19 59 55 31.3200 -97.3300 251.000 30.0 163.646 2.690 -999.990 -999.990 1.636 ..P WKT 2010 06 03 20 04 55 31.3200 -97.3300 251.000 122.0 162.542 2.800 -999.990 -999.990 1.625 ..P WKT 2010 06 03 20 09 55 31.3200 -97.3300 251.000 457.0 163.535 2.920 -999.990 -999.990 1.635 ..P WKT 2010 06 03 20 14 55 31.3200 -97.3300 251.000 30.0 161.733 2.900 -999.990 -999.990 1.617 ..P WKT 2010 06 03 20 19 55 31.3200 -97.3300 251.000 122.0 161.188 2.860 -999.990 -999.990 1.612 ..P WKT 2010 06 03 20 24 55 31.3200 -97.3300 251.000 457.0 167.770 3.790 -999.990 -999.990 1.678 ..P WKT 2010 06 03 20 34 55 31.3200 -97.3300 251.000 30.0 164.405 3.110 -999.990 -999.990 1.644 ..P WKT 2010 06 03 20 39 55 31.3200 -97.3300 251.000 122.0 167.313 3.050 -999.990 -999.990 1.673 ..P WKT 2010 06 03 20 44 55 31.3200 -97.3300 251.000 457.0 171.200 3.560 -999.990 -999.990 1.712 ..P WKT 2010 06 03 20 49 55 31.3200 -97.3300 251.000 30.0 168.519 3.400 -999.990 -999.990 1.685 ..P WKT 2010 06 03 20 54 55 31.3200 -97.3300 251.000 122.0 173.383 3.050 -999.990 -999.990 1.734 ..P WKT 2010 06 03 20 59 55 31.3200 -97.3300 251.000 457.0 146.669 4.990 -999.990 -999.990 1.467 ..P WKT 2010 06 03 21 09 55 31.3200 -97.3300 251.000 30.0 161.050 2.450 -999.990 -999.990 1.611 ..P WKT 2010 06 03 21 14 55 31.3200 -97.3300 251.000 122.0 173.640 2.590 -999.990 -999.990 1.736 ..P WKT 2010 06 03 21 19 55 31.3200 -97.3300 251.000 457.0 170.859 3.260 -999.990 -999.990 1.709 ..P WKT 2010 06 03 21 24 55 31.3200 -97.3300 251.000 30.0 167.520 3.260 -999.990 -999.990 1.675 ..P WKT 2010 06 03 21 29 55 31.3200 -97.3300 251.000 122.0 163.901 3.570 -999.990 -999.990 1.639 ..P WKT 2010 06 03 21 34 55 31.3200 -97.3300 251.000 457.0 174.814 4.260 -999.990 -999.990 1.748 ..P WKT 2010 06 03 21 44 55 31.3200 -97.3300 251.000 30.0 162.986 2.780 -999.990 -999.990 1.630 ..P WKT 2010 06 03 21 49 55 31.3200 -97.3300 251.000 122.0 151.982 2.940 -999.990 -999.990 1.520 ..P WKT 2010 06 03 21 54 55 31.3200 -97.3300 251.000 457.0 166.966 2.940 -999.990 -999.990 1.670 ..P WKT 2010 06 03 21 59 55 31.3200 -97.3300 251.000 30.0 157.640 3.020 -999.990 -999.990 1.576 ..P WKT 2010 06 03 22 04 55 31.3200 -97.3300 251.000 122.0 146.357 2.920 -999.990 -999.990 1.464 ..P WKT 2010 06 03 22 09 55 31.3200 -97.3300 251.000 457.0 172.796 3.760 -999.990 -999.990 1.728 ..P WKT 2010 06 03 22 19 55 31.3200 -97.3300 251.000 30.0 152.687 3.040 -999.990 -999.990 1.527 ..P WKT 2010 06 03 22 24 55 31.3200 -97.3300 251.000 122.0 150.845 2.830 -999.990 -999.990 1.508 ..P WKT 2010 06 03 22 29 55 31.3200 -97.3300 251.000 457.0 170.517 3.420 -999.990 -999.990 1.705 ..P WKT 2010 06 03 22 34 55 31.3200 -97.3300 251.000 30.0 146.882 4.320 -999.990 -999.990 1.469 ..P WKT 2010 06 03 22 39 55 31.3200 -97.3300 251.000 122.0 153.981 3.060 -999.990 -999.990 1.540 ..P WKT 2010 06 03 22 44 55 31.3200 -97.3300 251.000 457.0 175.609 3.340 -999.990 -999.990 1.756 ..P WKT 2010 06 03 22 54 55 31.3200 -97.3300 251.000 30.0 143.487 4.790 -999.990 -999.990 1.435 ..P WKT 2010 06 03 22 59 55 31.3200 -97.3300 251.000 122.0 149.249 3.490 -999.990 -999.990 1.492 ..P WKT 2010 06 03 23 04 55 31.3200 -97.3300 251.000 457.0 168.840 3.520 -999.990 -999.990 1.688 ..P WKT 2010 06 03 23 09 55 31.3200 -97.3300 251.000 30.0 139.818 2.970 -999.990 -999.990 1.398 ..P WKT 2010 06 03 23 14 55 31.3200 -97.3300 251.000 122.0 150.189 3.430 -999.990 -999.990 1.502 ..P WKT 2010 06 03 23 19 55 31.3200 -97.3300 251.000 457.0 157.907 3.210 -999.990 -999.990 1.579 ..P WKT 2010 06 03 23 29 55 31.3200 -97.3300 251.000 30.0 149.586 3.710 -999.990 -999.990 1.496 ..P WKT 2010 06 03 23 34 55 31.3200 -97.3300 251.000 122.0 152.966 3.870 -999.990 -999.990 1.530 ..P WKT 2010 06 03 23 39 55 31.3200 -97.3300 251.000 457.0 150.758 4.200 -999.990 -999.990 1.508 ..P WKT 2010 06 03 23 44 55 31.3200 -97.3300 251.000 30.0 149.527 3.300 -999.990 -999.990 1.495 ..P WKT 2010 06 03 23 49 55 31.3200 -97.3300 251.000 122.0 159.052 3.860 -999.990 -999.990 1.591 ..P WKT 2010 06 04 00 09 55 31.3200 -97.3300 251.000 457.0 163.722 4.450 -999.990 -999.990 1.637 ..P WKT 2010 06 04 00 10 25 31.3200 -97.3300 251.000 457.0 153.505 4.260 -999.990 -999.990 1.535 ..P WKT 2010 06 04 00 10 55 31.3200 -97.3300 251.000 457.0 150.970 3.210 -999.990 -999.990 1.510 ..P WKT 2010 06 04 00 11 25 31.3200 -97.3300 251.000 457.0 147.598 3.180 -999.990 -999.990 1.476 ..P WKT 2010 06 04 00 11 55 31.3200 -97.3300 251.000 457.0 146.181 3.420 -999.990 -999.990 1.462 ..P WKT 2010 06 04 00 12 25 31.3200 -97.3300 251.000 457.0 150.352 4.250 -999.990 -999.990 1.504 ..P WKT 2010 06 04 00 12 55 31.3200 -97.3300 251.000 457.0 147.398 3.870 -999.990 -999.990 1.474 ..P WKT 2010 06 04 00 13 25 31.3200 -97.3300 251.000 457.0 147.936 3.380 -999.990 -999.990 1.479 ..P WKT 2010 06 04 00 13 55 31.3200 -97.3300 251.000 457.0 150.430 4.540 -999.990 -999.990 1.504 ..P WKT 2010 06 04 00 14 25 31.3200 -97.3300 251.000 457.0 159.351 4.060 -999.990 -999.990 1.594 ..P WKT 2010 06 04 00 14 55 31.3200 -97.3300 251.000 457.0 160.029 3.480 -999.990 -999.990 1.600 ..P WKT 2010 06 04 00 19 55 31.3200 -97.3300 251.000 30.0 147.255 3.940 -999.990 -999.990 1.473 ..P WKT 2010 06 04 00 24 55 31.3200 -97.3300 251.000 122.0 151.524 3.540 -999.990 -999.990 1.515 ..P WKT 2010 06 04 00 29 55 31.3200 -97.3300 251.000 457.0 121.425 3.590 -999.990 -999.990 1.214 ..P WKT 2010 06 04 00 34 55 31.3200 -97.3300 251.000 30.0 150.841 2.860 -999.990 -999.990 1.508 ..P WKT 2010 06 04 00 39 55 31.3200 -97.3300 251.000 122.0 149.941 4.170 -999.990 -999.990 1.499 ..P WKT 2010 06 04 00 44 55 31.3200 -97.3300 251.000 457.0 112.572 3.750 -999.990 -999.990 1.126 ..P WKT 2010 06 04 00 54 55 31.3200 -97.3300 251.000 30.0 149.059 3.050 -999.990 -999.990 1.491 ..P WKT 2010 06 04 00 59 55 31.3200 -97.3300 251.000 122.0 141.033 3.110 -999.990 -999.990 1.410 ..P WKT 2010 06 04 01 04 55 31.3200 -97.3300 251.000 457.0 114.559 3.490 -999.990 -999.990 1.146 ..P WKT 2010 06 04 01 09 55 31.3200 -97.3300 251.000 30.0 141.193 4.600 -999.990 -999.990 1.412 ..P WKT 2010 06 04 01 14 55 31.3200 -97.3300 251.000 122.0 146.024 4.150 -999.990 -999.990 1.460 ..P WKT 2010 06 04 01 19 55 31.3200 -97.3300 251.000 457.0 124.299 3.430 -999.990 -999.990 1.243 ..P WKT 2010 06 04 01 29 55 31.3200 -97.3300 251.000 30.0 149.219 3.660 -999.990 -999.990 1.492 ..P WKT 2010 06 04 01 34 55 31.3200 -97.3300 251.000 122.0 158.966 4.320 -999.990 -999.990 1.590 ..P WKT 2010 06 04 01 39 55 31.3200 -97.3300 251.000 457.0 125.094 5.310 -999.990 -999.990 1.251 ..P WKT 2010 06 04 01 44 55 31.3200 -97.3300 251.000 30.0 164.200 5.700 -999.990 -999.990 1.642 ..P WKT 2010 06 04 01 49 55 31.3200 -97.3300 251.000 122.0 158.009 4.750 -999.990 -999.990 1.580 ..P WKT 2010 06 04 01 54 55 31.3200 -97.3300 251.000 457.0 133.920 4.120 -999.990 -999.990 1.339 ..P WKT 2010 06 04 02 04 55 31.3200 -97.3300 251.000 30.0 155.494 3.850 -999.990 -999.990 1.555 ..P WKT 2010 06 04 02 09 55 31.3200 -97.3300 251.000 122.0 156.972 4.780 -999.990 -999.990 1.570 ..P WKT 2010 06 04 02 14 55 31.3200 -97.3300 251.000 457.0 149.501 5.460 -999.990 -999.990 1.495 ..P WKT 2010 06 04 02 19 55 31.3200 -97.3300 251.000 30.0 154.337 5.910 -999.990 -999.990 1.543 ..P WKT 2010 06 04 02 24 55 31.3200 -97.3300 251.000 122.0 146.025 3.170 -999.990 -999.990 1.460 ..P WKT 2010 06 04 02 29 55 31.3200 -97.3300 251.000 457.0 147.503 4.640 -999.990 -999.990 1.475 ..P WKT 2010 06 04 02 39 55 31.3200 -97.3300 251.000 30.0 194.865 3.510 -999.990 -999.990 1.949 ..P WKT 2010 06 04 02 44 55 31.3200 -97.3300 251.000 122.0 138.071 3.280 -999.990 -999.990 1.381 ..P WKT 2010 06 04 02 49 55 31.3200 -97.3300 251.000 457.0 130.097 3.330 -999.990 -999.990 1.301 ..P WKT 2010 06 04 02 54 55 31.3200 -97.3300 251.000 30.0 150.522 3.510 -999.990 -999.990 1.505 ..P WKT 2010 06 04 02 59 55 31.3200 -97.3300 251.000 122.0 121.700 3.920 -999.990 -999.990 1.217 ..P WKT 2010 06 04 03 04 55 31.3200 -97.3300 251.000 457.0 123.518 3.750 -999.990 -999.990 1.235 ..P WKT 2010 06 04 03 14 55 31.3200 -97.3300 251.000 30.0 150.223 5.220 -999.990 -999.990 1.502 ..P WKT 2010 06 04 03 19 55 31.3200 -97.3300 251.000 122.0 122.076 3.080 -999.990 -999.990 1.221 ..P WKT 2010 06 04 03 24 55 31.3200 -97.3300 251.000 457.0 135.069 3.300 -999.990 -999.990 1.351 ..P WKT 2010 06 04 03 29 55 31.3200 -97.3300 251.000 30.0 149.044 3.200 -999.990 -999.990 1.490 ..P WKT 2010 06 04 03 34 55 31.3200 -97.3300 251.000 122.0 162.880 3.820 -999.990 -999.990 1.629 ..P WKT 2010 06 04 03 39 55 31.3200 -97.3300 251.000 457.0 153.624 3.210 -999.990 -999.990 1.536 ..P WKT 2010 06 04 03 49 55 31.3200 -97.3300 251.000 30.0 155.304 3.060 -999.990 -999.990 1.553 ..P WKT 2010 06 04 03 54 55 31.3200 -97.3300 251.000 122.0 156.024 3.160 -999.990 -999.990 1.560 ..P WKT 2010 06 04 03 59 55 31.3200 -97.3300 251.000 457.0 159.265 4.280 -999.990 -999.990 1.593 ..P WKT 2010 06 04 04 04 55 31.3200 -97.3300 251.000 30.0 148.506 3.050 -999.990 -999.990 1.485 ..P WKT 2010 06 04 04 09 55 31.3200 -97.3300 251.000 122.0 162.666 3.580 -999.990 -999.990 1.627 ..P WKT 2010 06 04 04 14 55 31.3200 -97.3300 251.000 457.0 165.767 3.670 -999.990 -999.990 1.658 ..P WKT 2010 06 04 04 24 55 31.3200 -97.3300 251.000 30.0 158.208 3.570 -999.990 -999.990 1.582 ..P WKT 2010 06 04 04 29 55 31.3200 -97.3300 251.000 122.0 167.851 3.960 -999.990 -999.990 1.679 ..P WKT 2010 06 04 04 34 55 31.3200 -97.3300 251.000 457.0 174.554 4.580 -999.990 -999.990 1.746 ..P WKT 2010 06 04 04 39 55 31.3200 -97.3300 251.000 30.0 169.214 5.870 -999.990 -999.990 1.692 ..P WKT 2010 06 04 04 44 55 31.3200 -97.3300 251.000 122.0 169.195 4.630 -999.990 -999.990 1.692 ..P WKT 2010 06 04 04 49 55 31.3200 -97.3300 251.000 457.0 163.293 4.030 -999.990 -999.990 1.633 ..P WKT 2010 06 04 05 04 55 31.3200 -97.3300 251.000 30.0 157.252 4.370 -999.990 -999.990 1.573 ..P WKT 2010 06 04 05 09 55 31.3200 -97.3300 251.000 122.0 165.448 5.950 -999.990 -999.990 1.654 ..P WKT 2010 06 04 05 14 55 31.3200 -97.3300 251.000 457.0 147.867 7.210 -999.990 -999.990 1.479 ..P WKT 2010 06 04 05 19 55 31.3200 -97.3300 251.000 30.0 153.821 7.260 -999.990 -999.990 1.538 ..P WKT 2010 06 04 05 24 55 31.3200 -97.3300 251.000 122.0 160.337 5.810 -999.990 -999.990 1.603 ..P WKT 2010 06 04 05 29 55 31.3200 -97.3300 251.000 457.0 169.374 4.670 -999.990 -999.990 1.694 ..P WKT 2010 06 04 05 39 55 31.3200 -97.3300 251.000 30.0 155.595 4.440 -999.990 -999.990 1.556 ..P WKT 2010 06 04 05 44 55 31.3200 -97.3300 251.000 122.0 145.105 6.440 -999.990 -999.990 1.451 ..P WKT 2010 06 04 05 49 55 31.3200 -97.3300 251.000 457.0 147.508 7.150 -999.990 -999.990 1.475 ..P WKT 2010 06 04 05 54 55 31.3200 -97.3300 251.000 30.0 150.751 6.920 -999.990 -999.990 1.508 ..P WKT 2010 06 04 05 59 55 31.3200 -97.3300 251.000 122.0 154.556 6.080 -999.990 -999.990 1.546 ..P WKT 2010 06 04 06 04 55 31.3200 -97.3300 251.000 457.0 144.064 4.580 -999.990 -999.990 1.441 ..P WKT 2010 06 04 06 14 55 31.3200 -97.3300 251.000 30.0 153.276 5.970 -999.990 -999.990 1.533 ..P WKT 2010 06 04 06 19 55 31.3200 -97.3300 251.000 122.0 146.908 5.830 -999.990 -999.990 1.469 ..P WKT 2010 06 04 06 24 55 31.3200 -97.3300 251.000 457.0 152.034 6.760 -999.990 -999.990 1.520 ..P WKT 2010 06 04 06 29 55 31.3200 -97.3300 251.000 30.0 134.730 5.890 -999.990 -999.990 1.347 ..P WKT 2010 06 04 06 34 55 31.3200 -97.3300 251.000 122.0 144.063 4.480 -999.990 -999.990 1.441 ..P WKT 2010 06 04 06 39 55 31.3200 -97.3300 251.000 457.0 148.910 3.890 -999.990 -999.990 1.489 ..P WKT 2010 06 04 06 49 55 31.3200 -97.3300 251.000 30.0 131.804 3.640 -999.990 -999.990 1.318 ..P WKT 2010 06 04 06 54 55 31.3200 -97.3300 251.000 122.0 120.225 5.450 -999.990 -999.990 1.202 ..P WKT 2010 06 04 06 59 55 31.3200 -97.3300 251.000 457.0 133.886 4.850 -999.990 -999.990 1.339 ..P WKT 2010 06 04 07 04 55 31.3200 -97.3300 251.000 30.0 117.397 4.130 -999.990 -999.990 1.174 ..P WKT 2010 06 04 07 09 55 31.3200 -97.3300 251.000 122.0 127.273 5.240 -999.990 -999.990 1.273 ..P WKT 2010 06 04 07 14 55 31.3200 -97.3300 251.000 457.0 135.608 3.500 -999.990 -999.990 1.356 ..P WKT 2010 06 04 07 24 55 31.3200 -97.3300 251.000 30.0 120.899 4.010 -999.990 -999.990 1.209 ..P WKT 2010 06 04 07 29 55 31.3200 -97.3300 251.000 122.0 136.007 3.610 -999.990 -999.990 1.360 ..P WKT 2010 06 04 07 34 55 31.3200 -97.3300 251.000 457.0 122.359 3.690 -999.990 -999.990 1.224 ..P WKT 2010 06 04 07 39 55 31.3200 -97.3300 251.000 30.0 119.653 4.580 -999.990 -999.990 1.197 ..P WKT 2010 06 04 07 44 55 31.3200 -97.3300 251.000 122.0 121.716 3.340 -999.990 -999.990 1.217 ..P WKT 2010 06 04 07 49 55 31.3200 -97.3300 251.000 457.0 114.800 3.760 -999.990 -999.990 1.148 ..P WKT 2010 06 04 07 59 55 31.3200 -97.3300 251.000 30.0 127.806 6.430 -999.990 -999.990 1.278 ..P WKT 2010 06 04 08 04 55 31.3200 -97.3300 251.000 122.0 119.666 3.540 -999.990 -999.990 1.197 ..P WKT 2010 06 04 08 09 55 31.3200 -97.3300 251.000 457.0 135.663 4.590 -999.990 -999.990 1.357 ..P WKT 2010 06 04 08 14 55 31.3200 -97.3300 251.000 30.0 121.068 4.400 -999.990 -999.990 1.211 ..P WKT 2010 06 04 08 19 55 31.3200 -97.3300 251.000 122.0 125.136 3.450 -999.990 -999.990 1.251 ..P WKT 2010 06 04 08 24 55 31.3200 -97.3300 251.000 457.0 124.293 3.700 -999.990 -999.990 1.243 ..P WKT 2010 06 04 08 34 55 31.3200 -97.3300 251.000 30.0 116.010 3.900 -999.990 -999.990 1.160 ..P WKT 2010 06 04 08 39 55 31.3200 -97.3300 251.000 122.0 137.064 3.740 -999.990 -999.990 1.371 ..P WKT 2010 06 04 08 44 55 31.3200 -97.3300 251.000 457.0 123.728 3.610 -999.990 -999.990 1.237 ..P WKT 2010 06 04 08 49 55 31.3200 -97.3300 251.000 30.0 136.220 3.760 -999.990 -999.990 1.362 ..P WKT 2010 06 04 08 54 55 31.3200 -97.3300 251.000 122.0 138.326 3.630 -999.990 -999.990 1.383 ..P WKT 2010 06 04 08 59 55 31.3200 -97.3300 251.000 457.0 123.864 4.170 -999.990 -999.990 1.239 ..P WKT 2010 06 04 09 09 55 31.3200 -97.3300 251.000 30.0 123.762 3.320 -999.990 -999.990 1.238 ..P WKT 2010 06 04 09 14 55 31.3200 -97.3300 251.000 122.0 133.631 3.460 -999.990 -999.990 1.336 ..P WKT 2010 06 04 09 19 55 31.3200 -97.3300 251.000 457.0 132.266 4.120 -999.990 -999.990 1.323 ..P WKT 2010 06 04 09 24 55 31.3200 -97.3300 251.000 30.0 124.160 3.290 -999.990 -999.990 1.242 ..P WKT 2010 06 04 09 29 55 31.3200 -97.3300 251.000 122.0 143.861 4.570 -999.990 -999.990 1.439 ..P WKT 2010 06 04 09 34 55 31.3200 -97.3300 251.000 457.0 129.576 3.460 -999.990 -999.990 1.296 ..P WKT 2010 06 04 09 44 55 31.3200 -97.3300 251.000 30.0 128.531 4.370 -999.990 -999.990 1.285 ..P WKT 2010 06 04 09 49 55 31.3200 -97.3300 251.000 122.0 135.875 3.620 -999.990 -999.990 1.359 ..P WKT 2010 06 04 09 54 55 31.3200 -97.3300 251.000 457.0 151.928 5.480 -999.990 -999.990 1.519 ..P WKT 2010 06 04 09 59 55 31.3200 -97.3300 251.000 30.0 132.863 4.240 -999.990 -999.990 1.329 ..P WKT 2010 06 04 10 04 55 31.3200 -97.3300 251.000 122.0 141.332 4.430 -999.990 -999.990 1.413 ..P WKT 2010 06 04 10 09 55 31.3200 -97.3300 251.000 457.0 146.991 3.910 -999.990 -999.990 1.470 ..P WKT 2010 06 04 10 19 55 31.3200 -97.3300 251.000 30.0 134.125 4.000 -999.990 -999.990 1.341 ..P WKT 2010 06 04 10 24 55 31.3200 -97.3300 251.000 122.0 143.980 4.100 -999.990 -999.990 1.440 ..P WKT 2010 06 04 10 29 55 31.3200 -97.3300 251.000 457.0 146.108 4.680 -999.990 -999.990 1.461 ..P WKT 2010 06 04 10 34 55 31.3200 -97.3300 251.000 30.0 135.730 4.320 -999.990 -999.990 1.357 ..P WKT 2010 06 04 10 39 55 31.3200 -97.3300 251.000 122.0 137.998 3.820 -999.990 -999.990 1.380 ..P WKT 2010 06 04 10 44 55 31.3200 -97.3300 251.000 457.0 148.698 4.860 -999.990 -999.990 1.487 ..P WKT 2010 06 04 10 54 55 31.3200 -97.3300 251.000 30.0 126.994 3.900 -999.990 -999.990 1.270 ..P WKT 2010 06 04 10 59 55 31.3200 -97.3300 251.000 122.0 132.816 4.190 -999.990 -999.990 1.328 ..P WKT 2010 06 04 11 04 55 31.3200 -97.3300 251.000 457.0 112.634 4.390 -999.990 -999.990 1.126 ..P WKT 2010 06 04 11 09 55 31.3200 -97.3300 251.000 30.0 131.248 4.690 -999.990 -999.990 1.312 ..P WKT 2010 06 04 11 14 55 31.3200 -97.3300 251.000 122.0 137.212 5.000 -999.990 -999.990 1.372 ..P WKT 2010 06 04 11 19 55 31.3200 -97.3300 251.000 457.0 110.701 5.000 -999.990 -999.990 1.107 ..P WKT 2010 06 04 11 29 55 31.3200 -97.3300 251.000 30.0 119.756 4.660 -999.990 -999.990 1.198 ..P WKT 2010 06 04 11 34 55 31.3200 -97.3300 251.000 122.0 133.112 4.510 -999.990 -999.990 1.331 ..P WKT 2010 06 04 11 39 55 31.3200 -97.3300 251.000 457.0 106.818 4.260 -999.990 -999.990 1.068 ..P WKT 2010 06 04 11 44 55 31.3200 -97.3300 251.000 30.0 123.127 4.960 -999.990 -999.990 1.231 ..P WKT 2010 06 04 11 49 55 31.3200 -97.3300 251.000 122.0 135.361 4.370 -999.990 -999.990 1.354 ..P WKT 2010 06 04 12 09 55 31.3200 -97.3300 251.000 457.0 114.507 4.120 -999.990 -999.990 1.145 ..P WKT 2010 06 04 12 10 25 31.3200 -97.3300 251.000 457.0 112.817 4.480 -999.990 -999.990 1.128 ..P WKT 2010 06 04 12 10 55 31.3200 -97.3300 251.000 457.0 108.596 4.690 -999.990 -999.990 1.086 ..P WKT 2010 06 04 12 11 25 31.3200 -97.3300 251.000 457.0 113.938 4.400 -999.990 -999.990 1.139 ..P WKT 2010 06 04 12 11 55 31.3200 -97.3300 251.000 457.0 112.247 4.180 -999.990 -999.990 1.122 ..P WKT 2010 06 04 12 12 25 31.3200 -97.3300 251.000 457.0 113.651 3.960 -999.990 -999.990 1.137 ..P WKT 2010 06 04 12 12 55 31.3200 -97.3300 251.000 457.0 115.195 4.370 -999.990 -999.990 1.152 ..P WKT 2010 06 04 12 13 25 31.3200 -97.3300 251.000 457.0 119.692 4.560 -999.990 -999.990 1.197 ..P WKT 2010 06 04 12 13 55 31.3200 -97.3300 251.000 457.0 116.596 5.110 -999.990 -999.990 1.166 ..P WKT 2010 06 04 12 14 25 31.3200 -97.3300 251.000 457.0 114.062 4.850 -999.990 -999.990 1.141 ..P WKT 2010 06 04 12 14 55 31.3200 -97.3300 251.000 457.0 111.388 5.240 -999.990 -999.990 1.114 ..P WKT 2010 06 04 12 19 55 31.3200 -97.3300 251.000 30.0 122.752 4.630 -999.990 -999.990 1.228 ..P WKT 2010 06 04 12 24 55 31.3200 -97.3300 251.000 122.0 149.019 4.390 -999.990 -999.990 1.490 ..P WKT 2010 06 04 12 29 55 31.3200 -97.3300 251.000 457.0 124.809 4.820 -999.990 -999.990 1.248 ..P WKT 2010 06 04 12 34 55 31.3200 -97.3300 251.000 30.0 119.721 4.510 -999.990 -999.990 1.197 ..P WKT 2010 06 04 12 39 55 31.3200 -97.3300 251.000 122.0 136.003 4.660 -999.990 -999.990 1.360 ..P WKT 2010 06 04 12 44 55 31.3200 -97.3300 251.000 457.0 150.316 6.010 -999.990 -999.990 1.503 ..P WKT 2010 06 04 12 54 55 31.3200 -97.3300 251.000 30.0 150.879 4.690 -999.990 -999.990 1.509 ..P WKT 2010 06 04 12 59 55 31.3200 -97.3300 251.000 122.0 128.698 4.370 -999.990 -999.990 1.287 ..P WKT 2010 06 04 13 04 55 31.3200 -97.3300 251.000 457.0 148.406 4.700 -999.990 -999.990 1.484 ..P WKT 2010 06 04 13 09 55 31.3200 -97.3300 251.000 30.0 159.117 4.860 -999.990 -999.990 1.591 ..P WKT 2010 06 04 13 14 55 31.3200 -97.3300 251.000 122.0 131.035 4.430 -999.990 -999.990 1.310 ..P WKT 2010 06 04 13 19 55 31.3200 -97.3300 251.000 457.0 142.870 4.800 -999.990 -999.990 1.429 ..P WKT 2010 06 04 13 29 55 31.3200 -97.3300 251.000 30.0 164.288 4.080 -999.990 -999.990 1.643 ..P WKT 2010 06 04 13 34 55 31.3200 -97.3300 251.000 122.0 143.799 4.040 -999.990 -999.990 1.438 ..P WKT 2010 06 04 13 39 55 31.3200 -97.3300 251.000 457.0 146.638 4.650 -999.990 -999.990 1.466 ..P WKT 2010 06 04 13 44 55 31.3200 -97.3300 251.000 30.0 153.693 4.830 -999.990 -999.990 1.537 ..P WKT 2010 06 04 13 49 55 31.3200 -97.3300 251.000 122.0 143.323 5.090 -999.990 -999.990 1.433 ..P WKT 2010 06 04 13 54 55 31.3200 -97.3300 251.000 457.0 157.684 5.620 -999.990 -999.990 1.577 ..P WKT 2010 06 04 14 04 55 31.3200 -97.3300 251.000 30.0 146.640 5.630 -999.990 -999.990 1.466 ..P WKT 2010 06 04 14 09 55 31.3200 -97.3300 251.000 122.0 141.190 5.930 -999.990 -999.990 1.412 ..P WKT 2010 06 04 14 14 55 31.3200 -97.3300 251.000 457.0 155.688 5.670 -999.990 -999.990 1.557 ..P WKT 2010 06 04 14 19 55 31.3200 -97.3300 251.000 30.0 137.876 5.690 -999.990 -999.990 1.379 ..P WKT 2010 06 04 14 24 55 31.3200 -97.3300 251.000 122.0 152.092 5.830 -999.990 -999.990 1.521 ..P WKT 2010 06 04 14 29 55 31.3200 -97.3300 251.000 457.0 135.545 4.800 -999.990 -999.990 1.355 ..P WKT 2010 06 04 14 39 55 31.3200 -97.3300 251.000 30.0 134.680 5.230 -999.990 -999.990 1.347 ..P WKT 2010 06 04 14 44 55 31.3200 -97.3300 251.000 122.0 155.697 4.890 -999.990 -999.990 1.557 ..P WKT 2010 06 04 14 49 55 31.3200 -97.3300 251.000 457.0 143.146 5.820 -999.990 -999.990 1.431 ..P WKT 2010 06 04 14 54 55 31.3200 -97.3300 251.000 30.0 142.953 5.130 -999.990 -999.990 1.430 ..P WKT 2010 06 04 14 59 55 31.3200 -97.3300 251.000 122.0 149.643 4.740 -999.990 -999.990 1.496 ..P WKT 2010 06 04 15 04 55 31.3200 -97.3300 251.000 457.0 146.221 4.930 -999.990 -999.990 1.462 ..P WKT 2010 06 04 15 14 55 31.3200 -97.3300 251.000 30.0 145.696 4.930 -999.990 -999.990 1.457 ..P WKT 2010 06 04 15 19 55 31.3200 -97.3300 251.000 122.0 148.733 5.190 -999.990 -999.990 1.487 ..P WKT 2010 06 04 15 24 55 31.3200 -97.3300 251.000 457.0 113.441 4.520 -999.990 -999.990 1.134 ..P WKT 2010 06 04 15 29 55 31.3200 -97.3300 251.000 30.0 145.682 4.310 -999.990 -999.990 1.457 ..P WKT 2010 06 04 15 34 55 31.3200 -97.3300 251.000 122.0 151.667 5.700 -999.990 -999.990 1.517 ..P WKT 2010 06 04 15 39 55 31.3200 -97.3300 251.000 457.0 113.008 4.480 -999.990 -999.990 1.130 ..P WKT 2010 06 04 15 49 55 31.3200 -97.3300 251.000 30.0 130.696 5.230 -999.990 -999.990 1.307 ..P WKT 2010 06 04 15 54 55 31.3200 -97.3300 251.000 122.0 139.026 4.320 -999.990 -999.990 1.390 ..P WKT 2010 06 04 15 59 55 31.3200 -97.3300 251.000 457.0 122.092 4.080 -999.990 -999.990 1.221 ..P WKT 2010 06 04 16 04 55 31.3200 -97.3300 251.000 30.0 127.475 4.140 -999.990 -999.990 1.275 ..P WKT 2010 06 04 16 09 55 31.3200 -97.3300 251.000 122.0 128.366 3.830 -999.990 -999.990 1.284 ..P WKT 2010 06 04 16 14 55 31.3200 -97.3300 251.000 457.0 135.573 4.100 -999.990 -999.990 1.356 ..P WKT 2010 06 04 16 24 55 31.3200 -97.3300 251.000 30.0 127.592 3.880 -999.990 -999.990 1.276 ..P WKT 2010 06 04 16 29 55 31.3200 -97.3300 251.000 122.0 135.981 5.540 -999.990 -999.990 1.360 ..P WKT 2010 06 04 16 34 55 31.3200 -97.3300 251.000 457.0 129.635 4.100 -999.990 -999.990 1.296 ..P WKT 2010 06 04 16 39 55 31.3200 -97.3300 251.000 30.0 126.938 3.890 -999.990 -999.990 1.269 ..P WKT 2010 06 04 16 44 55 31.3200 -97.3300 251.000 122.0 132.941 4.690 -999.990 -999.990 1.329 ..P WKT 2010 06 04 16 49 55 31.3200 -97.3300 251.000 457.0 127.438 4.070 -999.990 -999.990 1.274 ..P WKT 2010 06 04 17 04 55 31.3200 -97.3300 251.000 30.0 122.475 3.830 -999.990 -999.990 1.225 ..P WKT 2010 06 04 17 09 55 31.3200 -97.3300 251.000 122.0 130.180 4.060 -999.990 -999.990 1.302 ..P WKT 2010 06 04 17 14 55 31.3200 -97.3300 251.000 457.0 121.612 5.100 -999.990 -999.990 1.216 ..P WKT 2010 06 04 17 19 55 31.3200 -97.3300 251.000 30.0 122.022 5.430 -999.990 -999.990 1.220 ..P WKT 2010 06 04 17 24 55 31.3200 -97.3300 251.000 122.0 137.020 4.800 -999.990 -999.990 1.370 ..P WKT 2010 06 04 17 29 55 31.3200 -97.3300 251.000 457.0 123.403 4.270 -999.990 -999.990 1.234 ..P WKT 2010 06 04 17 39 55 31.3200 -97.3300 251.000 30.0 131.216 4.160 -999.990 -999.990 1.312 ..P WKT 2010 06 04 17 44 55 31.3200 -97.3300 251.000 122.0 136.374 4.520 -999.990 -999.990 1.364 ..P WKT 2010 06 04 17 49 55 31.3200 -97.3300 251.000 457.0 130.032 5.400 -999.990 -999.990 1.300 ..P WKT 2010 06 04 17 54 55 31.3200 -97.3300 251.000 30.0 132.385 6.080 -999.990 -999.990 1.324 ..P WKT 2010 06 04 17 59 55 31.3200 -97.3300 251.000 122.0 137.823 5.490 -999.990 -999.990 1.378 ..P WKT 2010 06 04 18 04 55 31.3200 -97.3300 251.000 457.0 129.799 5.610 -999.990 -999.990 1.298 ..P WKT 2010 06 04 18 14 55 31.3200 -97.3300 251.000 30.0 136.308 4.520 -999.990 -999.990 1.363 ..P WKT 2010 06 04 18 19 55 31.3200 -97.3300 251.000 122.0 144.948 5.810 -999.990 -999.990 1.449 ..P WKT 2010 06 04 18 24 55 31.3200 -97.3300 251.000 457.0 131.859 6.140 -999.990 -999.990 1.319 ..P WKT 2010 06 04 18 29 55 31.3200 -97.3300 251.000 30.0 129.284 5.260 -999.990 -999.990 1.293 ..P WKT 2010 06 04 18 34 55 31.3200 -97.3300 251.000 122.0 144.654 4.980 -999.990 -999.990 1.447 ..P WKT 2010 06 04 18 39 55 31.3200 -97.3300 251.000 457.0 132.547 5.460 -999.990 -999.990 1.325 ..P WKT 2010 06 04 18 49 55 31.3200 -97.3300 251.000 30.0 134.527 5.050 -999.990 -999.990 1.345 ..P WKT 2010 06 04 18 54 55 31.3200 -97.3300 251.000 122.0 139.362 5.340 -999.990 -999.990 1.394 ..P WKT 2010 06 04 18 59 55 31.3200 -97.3300 251.000 457.0 127.798 5.110 -999.990 -999.990 1.278 ..P WKT 2010 06 04 19 04 55 31.3200 -97.3300 251.000 30.0 132.211 6.240 -999.990 -999.990 1.322 ..P WKT 2010 06 04 19 09 55 31.3200 -97.3300 251.000 122.0 136.345 5.550 -999.990 -999.990 1.363 ..P WKT 2010 06 04 19 14 55 31.3200 -97.3300 251.000 457.0 131.229 6.620 -999.990 -999.990 1.312 ..P WKT 2010 06 04 19 24 55 31.3200 -97.3300 251.000 30.0 128.345 5.950 -999.990 -999.990 1.283 ..P WKT 2010 06 04 19 29 55 31.3200 -97.3300 251.000 122.0 134.079 6.410 -999.990 -999.990 1.341 ..P WKT 2010 06 04 19 34 55 31.3200 -97.3300 251.000 457.0 133.507 5.290 -999.990 -999.990 1.335 ..P WKT 2010 06 04 19 39 55 31.3200 -97.3300 251.000 30.0 134.336 4.680 -999.990 -999.990 1.343 ..P WKT 2010 06 04 19 44 55 31.3200 -97.3300 251.000 122.0 139.930 4.520 -999.990 -999.990 1.399 ..P WKT 2010 06 04 19 49 55 31.3200 -97.3300 251.000 457.0 125.909 4.220 -999.990 -999.990 1.259 ..P WKT 2010 06 04 19 59 55 31.3200 -97.3300 251.000 30.0 130.230 4.300 -999.990 -999.990 1.302 ..P WKT 2010 06 04 20 04 55 31.3200 -97.3300 251.000 122.0 129.658 4.490 -999.990 -999.990 1.297 ..P WKT 2010 06 04 20 09 55 31.3200 -97.3300 251.000 457.0 122.924 4.570 -999.990 -999.990 1.229 ..P WKT 2010 06 04 20 14 55 31.3200 -97.3300 251.000 30.0 129.077 5.170 -999.990 -999.990 1.291 ..P WKT 2010 06 04 20 19 55 31.3200 -97.3300 251.000 122.0 140.130 4.210 -999.990 -999.990 1.401 ..P WKT 2010 06 04 20 24 55 31.3200 -97.3300 251.000 457.0 119.951 4.420 -999.990 -999.990 1.200 ..P WKT 2010 06 04 20 34 55 31.3200 -97.3300 251.000 30.0 128.433 5.660 -999.990 -999.990 1.284 ..P WKT 2010 06 04 20 39 55 31.3200 -97.3300 251.000 122.0 129.503 4.280 -999.990 -999.990 1.295 ..P WKT 2010 06 04 20 44 55 31.3200 -97.3300 251.000 457.0 120.490 4.400 -999.990 -999.990 1.205 ..P WKT 2010 06 04 20 49 55 31.3200 -97.3300 251.000 30.0 124.920 4.050 -999.990 -999.990 1.249 ..P WKT 2010 06 04 20 54 55 31.3200 -97.3300 251.000 122.0 123.469 4.640 -999.990 -999.990 1.235 ..P WKT 2010 06 04 20 59 55 31.3200 -97.3300 251.000 457.0 119.499 4.020 -999.990 -999.990 1.195 ..P WKT 2010 06 04 21 09 55 31.3200 -97.3300 251.000 30.0 117.518 4.120 -999.990 -999.990 1.175 ..P WKT 2010 06 04 21 14 55 31.3200 -97.3300 251.000 122.0 124.547 4.070 -999.990 -999.990 1.245 ..P WKT 2010 06 04 21 19 55 31.3200 -97.3300 251.000 457.0 114.497 4.560 -999.990 -999.990 1.145 ..P WKT 2010 06 04 21 24 55 31.3200 -97.3300 251.000 30.0 112.007 5.350 -999.990 -999.990 1.120 ..P WKT 2010 06 04 21 29 55 31.3200 -97.3300 251.000 122.0 129.674 4.680 -999.990 -999.990 1.297 ..P WKT 2010 06 04 21 34 55 31.3200 -97.3300 251.000 457.0 122.424 4.560 -999.990 -999.990 1.224 ..P WKT 2010 06 04 21 44 55 31.3200 -97.3300 251.000 30.0 127.962 4.270 -999.990 -999.990 1.280 ..P WKT 2010 06 04 21 49 55 31.3200 -97.3300 251.000 122.0 132.630 4.960 -999.990 -999.990 1.326 ..P WKT 2010 06 04 21 54 55 31.3200 -97.3300 251.000 457.0 125.541 5.010 -999.990 -999.990 1.255 ..P WKT 2010 06 04 21 59 55 31.3200 -97.3300 251.000 30.0 137.486 5.320 -999.990 -999.990 1.375 ..P WKT 2010 06 04 22 04 55 31.3200 -97.3300 251.000 122.0 144.952 6.210 -999.990 -999.990 1.450 ..P WKT 2010 06 04 22 09 55 31.3200 -97.3300 251.000 457.0 142.061 5.380 -999.990 -999.990 1.421 ..P WKT 2010 06 04 22 19 55 31.3200 -97.3300 251.000 30.0 137.082 4.850 -999.990 -999.990 1.371 ..P WKT 2010 06 04 22 24 55 31.3200 -97.3300 251.000 122.0 145.486 5.820 -999.990 -999.990 1.455 ..P WKT 2010 06 04 22 29 55 31.3200 -97.3300 251.000 457.0 145.494 5.920 -999.990 -999.990 1.455 ..P WKT 2010 06 04 22 34 55 31.3200 -97.3300 251.000 30.0 150.540 5.290 -999.990 -999.990 1.505 ..P WKT 2010 06 04 22 39 55 31.3200 -97.3300 251.000 122.0 153.206 5.020 -999.990 -999.990 1.532 ..P WKT 2010 06 04 22 44 55 31.3200 -97.3300 251.000 457.0 144.260 5.590 -999.990 -999.990 1.443 ..P WKT 2010 06 04 22 54 55 31.3200 -97.3300 251.000 30.0 157.786 5.470 -999.990 -999.990 1.578 ..P WKT 2010 06 04 22 59 55 31.3200 -97.3300 251.000 122.0 153.818 5.140 -999.990 -999.990 1.538 ..P WKT 2010 06 04 23 04 55 31.3200 -97.3300 251.000 457.0 145.374 5.700 -999.990 -999.990 1.454 ..P WKT 2010 06 04 23 09 55 31.3200 -97.3300 251.000 30.0 150.637 5.220 -999.990 -999.990 1.506 ..P WKT 2010 06 04 23 14 55 31.3200 -97.3300 251.000 122.0 161.495 5.300 -999.990 -999.990 1.615 ..P WKT 2010 06 04 23 19 55 31.3200 -97.3300 251.000 457.0 146.059 5.260 -999.990 -999.990 1.461 ..P WKT 2010 06 04 23 29 55 31.3200 -97.3300 251.000 30.0 149.526 5.280 -999.990 -999.990 1.495 ..P WKT 2010 06 04 23 34 55 31.3200 -97.3300 251.000 122.0 157.801 5.650 -999.990 -999.990 1.578 ..P WKT 2010 06 04 23 39 55 31.3200 -97.3300 251.000 457.0 155.865 5.150 -999.990 -999.990 1.559 ..P WKT 2010 06 04 23 44 55 31.3200 -97.3300 251.000 30.0 156.868 5.350 -999.990 -999.990 1.569 ..P WKT 2010 06 04 23 49 55 31.3200 -97.3300 251.000 122.0 158.289 5.920 -999.990 -999.990 1.583 ..P WKT 2010 06 05 00 09 55 31.3200 -97.3300 251.000 457.0 152.141 5.680 -999.990 -999.990 1.521 ..P WKT 2010 06 05 00 10 25 31.3200 -97.3300 251.000 457.0 150.257 5.270 -999.990 -999.990 1.503 ..P WKT 2010 06 05 00 10 55 31.3200 -97.3300 251.000 457.0 151.869 5.300 -999.990 -999.990 1.519 ..P WKT 2010 06 05 00 11 25 31.3200 -97.3300 251.000 457.0 146.770 5.350 -999.990 -999.990 1.468 ..P WKT 2010 06 05 00 11 55 31.3200 -97.3300 251.000 457.0 150.059 5.610 -999.990 -999.990 1.501 ..P WKT 2010 06 05 00 12 25 31.3200 -97.3300 251.000 457.0 153.629 5.430 -999.990 -999.990 1.536 ..P WKT 2010 06 05 00 12 55 31.3200 -97.3300 251.000 457.0 158.875 5.530 -999.990 -999.990 1.589 ..P WKT 2010 06 05 00 13 25 31.3200 -97.3300 251.000 457.0 156.292 5.770 -999.990 -999.990 1.563 ..P WKT 2010 06 05 00 13 55 31.3200 -97.3300 251.000 457.0 153.710 5.230 -999.990 -999.990 1.537 ..P WKT 2010 06 05 00 14 25 31.3200 -97.3300 251.000 457.0 152.805 5.320 -999.990 -999.990 1.528 ..P WKT 2010 06 05 00 14 55 31.3200 -97.3300 251.000 457.0 152.739 5.840 -999.990 -999.990 1.527 ..P WKT 2010 06 05 00 19 55 31.3200 -97.3300 251.000 30.0 149.843 5.130 -999.990 -999.990 1.498 ..P WKT 2010 06 05 00 24 55 31.3200 -97.3300 251.000 122.0 153.238 5.100 -999.990 -999.990 1.532 ..P WKT 2010 06 05 00 29 55 31.3200 -97.3300 251.000 457.0 149.782 5.030 -999.990 -999.990 1.498 ..P WKT 2010 06 05 00 34 55 31.3200 -97.3300 251.000 30.0 143.532 7.160 -999.990 -999.990 1.435 ..P WKT 2010 06 05 00 39 55 31.3200 -97.3300 251.000 122.0 145.947 5.610 -999.990 -999.990 1.459 ..P WKT 2010 06 05 00 44 55 31.3200 -97.3300 251.000 457.0 139.138 5.350 -999.990 -999.990 1.391 ..P WKT 2010 06 05 00 54 55 31.3200 -97.3300 251.000 30.0 146.754 4.930 -999.990 -999.990 1.468 ..P WKT 2010 06 05 00 59 55 31.3200 -97.3300 251.000 122.0 150.557 4.900 -999.990 -999.990 1.506 ..P WKT 2010 06 05 01 04 55 31.3200 -97.3300 251.000 457.0 126.964 4.770 -999.990 -999.990 1.270 ..P WKT 2010 06 05 01 09 55 31.3200 -97.3300 251.000 30.0 138.034 6.800 -999.990 -999.990 1.380 ..P WKT 2010 06 05 01 14 55 31.3200 -97.3300 251.000 122.0 134.848 5.030 -999.990 -999.990 1.348 ..P WKT 2010 06 05 01 19 55 31.3200 -97.3300 251.000 457.0 131.103 4.140 -999.990 -999.990 1.311 ..P WKT 2010 06 05 01 29 55 31.3200 -97.3300 251.000 30.0 133.636 4.550 -999.990 -999.990 1.336 ..P WKT 2010 06 05 01 34 55 31.3200 -97.3300 251.000 122.0 135.442 4.490 -999.990 -999.990 1.354 ..P WKT 2010 06 05 01 39 55 31.3200 -97.3300 251.000 457.0 132.775 4.370 -999.990 -999.990 1.328 ..P WKT 2010 06 05 01 44 55 31.3200 -97.3300 251.000 30.0 134.021 4.760 -999.990 -999.990 1.340 ..P WKT 2010 06 05 01 49 55 31.3200 -97.3300 251.000 122.0 139.740 4.570 -999.990 -999.990 1.397 ..P WKT 2010 06 05 01 54 55 31.3200 -97.3300 251.000 457.0 132.322 4.850 -999.990 -999.990 1.323 ..P WKT 2010 06 05 02 04 55 31.3200 -97.3300 251.000 30.0 132.020 4.830 -999.990 -999.990 1.320 ..P WKT 2010 06 05 02 09 55 31.3200 -97.3300 251.000 122.0 129.354 4.490 -999.990 -999.990 1.294 ..P WKT 2010 06 05 02 14 55 31.3200 -97.3300 251.000 457.0 127.805 4.520 -999.990 -999.990 1.278 ..P WKT 2010 06 05 02 19 55 31.3200 -97.3300 251.000 30.0 131.567 5.500 -999.990 -999.990 1.316 ..P WKT 2010 06 05 02 24 55 31.3200 -97.3300 251.000 122.0 129.320 4.420 -999.990 -999.990 1.293 ..P WKT 2010 06 05 02 29 55 31.3200 -97.3300 251.000 457.0 137.693 4.360 -999.990 -999.990 1.377 ..P WKT 2010 06 05 02 39 55 31.3200 -97.3300 251.000 30.0 138.928 4.470 -999.990 -999.990 1.389 ..P WKT 2010 06 05 02 44 55 31.3200 -97.3300 251.000 122.0 139.335 4.690 -999.990 -999.990 1.393 ..P WKT 2010 06 05 02 49 55 31.3200 -97.3300 251.000 457.0 138.067 5.600 -999.990 -999.990 1.381 ..P WKT 2010 06 05 02 54 55 31.3200 -97.3300 251.000 30.0 128.275 5.300 -999.990 -999.990 1.283 ..P WKT 2010 06 05 02 59 55 31.3200 -97.3300 251.000 122.0 130.779 4.670 -999.990 -999.990 1.308 ..P WKT 2010 06 05 03 04 55 31.3200 -97.3300 251.000 457.0 137.195 4.530 -999.990 -999.990 1.372 ..P WKT 2010 06 05 03 14 55 31.3200 -97.3300 251.000 30.0 132.103 4.460 -999.990 -999.990 1.321 ..P WKT 2010 06 05 03 19 55 31.3200 -97.3300 251.000 122.0 134.287 4.330 -999.990 -999.990 1.343 ..P WKT 2010 06 05 03 24 55 31.3200 -97.3300 251.000 457.0 138.846 4.390 -999.990 -999.990 1.388 ..P WKT 2010 06 05 03 29 55 31.3200 -97.3300 251.000 30.0 129.156 4.250 -999.990 -999.990 1.292 ..P WKT 2010 06 05 03 34 55 31.3200 -97.3300 251.000 122.0 133.156 4.230 -999.990 -999.990 1.332 ..P WKT 2010 06 05 03 39 55 31.3200 -97.3300 251.000 457.0 138.693 4.180 -999.990 -999.990 1.387 ..P WKT 2010 06 05 03 49 55 31.3200 -97.3300 251.000 30.0 135.516 4.400 -999.990 -999.990 1.355 ..P WKT 2010 06 05 03 54 55 31.3200 -97.3300 251.000 122.0 131.973 4.320 -999.990 -999.990 1.320 ..P WKT 2010 06 05 03 59 55 31.3200 -97.3300 251.000 457.0 136.393 4.580 -999.990 -999.990 1.364 ..P WKT 2010 06 05 04 04 55 31.3200 -97.3300 251.000 30.0 135.224 4.740 -999.990 -999.990 1.352 ..P WKT 2010 06 05 04 09 55 31.3200 -97.3300 251.000 122.0 130.144 4.350 -999.990 -999.990 1.301 ..P WKT 2010 06 05 04 14 55 31.3200 -97.3300 251.000 457.0 133.166 4.220 -999.990 -999.990 1.332 ..P WKT 2010 06 05 04 24 55 31.3200 -97.3300 251.000 30.0 142.242 5.530 -999.990 -999.990 1.422 ..P WKT 2010 06 05 04 29 55 31.3200 -97.3300 251.000 122.0 136.704 4.190 -999.990 -999.990 1.367 ..P WKT 2010 06 05 04 34 55 31.3200 -97.3300 251.000 457.0 133.122 4.420 -999.990 -999.990 1.331 ..P WKT 2010 06 05 04 39 55 31.3200 -97.3300 251.000 30.0 142.388 4.610 -999.990 -999.990 1.424 ..P WKT 2010 06 05 04 44 55 31.3200 -97.3300 251.000 122.0 134.336 4.320 -999.990 -999.990 1.343 ..P WKT 2010 06 05 04 49 55 31.3200 -97.3300 251.000 457.0 132.150 3.840 -999.990 -999.990 1.322 ..P WKT 2010 06 05 05 04 55 31.3200 -97.3300 251.000 30.0 137.104 3.740 -999.990 -999.990 1.371 ..P WKT 2010 06 05 05 09 55 31.3200 -97.3300 251.000 122.0 125.871 4.380 -999.990 -999.990 1.259 ..P WKT 2010 06 05 05 14 55 31.3200 -97.3300 251.000 457.0 127.765 4.240 -999.990 -999.990 1.278 ..P WKT 2010 06 05 05 19 55 31.3200 -97.3300 251.000 30.0 133.010 3.810 -999.990 -999.990 1.330 ..P WKT 2010 06 05 05 24 55 31.3200 -97.3300 251.000 122.0 126.247 4.150 -999.990 -999.990 1.262 ..P WKT 2010 06 05 05 29 55 31.3200 -97.3300 251.000 457.0 129.816 4.190 -999.990 -999.990 1.298 ..P WKT 2010 06 05 05 39 55 31.3200 -97.3300 251.000 30.0 144.406 4.060 -999.990 -999.990 1.444 ..P WKT 2010 06 05 05 44 55 31.3200 -97.3300 251.000 122.0 132.247 4.300 -999.990 -999.990 1.322 ..P WKT 2010 06 05 05 49 55 31.3200 -97.3300 251.000 457.0 127.907 4.230 -999.990 -999.990 1.279 ..P WKT 2010 06 05 05 54 55 31.3200 -97.3300 251.000 30.0 152.609 4.690 -999.990 -999.990 1.526 ..P WKT 2010 06 05 05 59 55 31.3200 -97.3300 251.000 122.0 130.398 4.830 -999.990 -999.990 1.304 ..P WKT 2010 06 05 06 04 55 31.3200 -97.3300 251.000 457.0 121.870 4.290 -999.990 -999.990 1.219 ..P WKT 2010 06 05 06 14 55 31.3200 -97.3300 251.000 30.0 144.504 4.630 -999.990 -999.990 1.445 ..P WKT 2010 06 05 06 19 55 31.3200 -97.3300 251.000 122.0 130.712 4.990 -999.990 -999.990 1.307 ..P WKT 2010 06 05 06 24 55 31.3200 -97.3300 251.000 457.0 120.270 5.010 -999.990 -999.990 1.203 ..P WKT 2010 06 05 06 29 55 31.3200 -97.3300 251.000 30.0 144.730 5.060 -999.990 -999.990 1.447 ..P WKT 2010 06 05 06 34 55 31.3200 -97.3300 251.000 122.0 140.152 4.610 -999.990 -999.990 1.402 ..P WKT 2010 06 05 06 39 55 31.3200 -97.3300 251.000 457.0 134.596 4.730 -999.990 -999.990 1.346 ..P WKT 2010 06 05 06 49 55 31.3200 -97.3300 251.000 30.0 146.838 4.700 -999.990 -999.990 1.468 ..P WKT 2010 06 05 06 54 55 31.3200 -97.3300 251.000 122.0 132.390 4.830 -999.990 -999.990 1.324 ..P WKT 2010 06 05 06 59 55 31.3200 -97.3300 251.000 457.0 167.354 7.230 -999.990 -999.990 1.674 ..P WKT 2010 06 05 07 04 55 31.3200 -97.3300 251.000 30.0 142.018 5.430 -999.990 -999.990 1.420 ..P WKT 2010 06 05 07 09 55 31.3200 -97.3300 251.000 122.0 143.762 5.630 -999.990 -999.990 1.438 ..P WKT 2010 06 05 07 14 55 31.3200 -97.3300 251.000 457.0 132.385 5.960 -999.990 -999.990 1.324 ..P WKT 2010 06 05 07 24 55 31.3200 -97.3300 251.000 30.0 147.037 5.460 -999.990 -999.990 1.470 ..P WKT 2010 06 05 07 29 55 31.3200 -97.3300 251.000 122.0 156.457 5.460 -999.990 -999.990 1.565 ..P WKT 2010 06 05 07 34 55 31.3200 -97.3300 251.000 457.0 137.683 5.150 -999.990 -999.990 1.377 ..P WKT 2010 06 05 07 39 55 31.3200 -97.3300 251.000 30.0 141.241 4.920 -999.990 -999.990 1.412 ..P WKT 2010 06 05 07 44 55 31.3200 -97.3300 251.000 122.0 155.824 4.700 -999.990 -999.990 1.558 ..P WKT 2010 06 05 07 49 55 31.3200 -97.3300 251.000 457.0 141.378 4.290 -999.990 -999.990 1.414 ..P WKT 2010 06 05 07 59 55 31.3200 -97.3300 251.000 30.0 146.917 4.370 -999.990 -999.990 1.469 ..P WKT 2010 06 05 08 04 55 31.3200 -97.3300 251.000 122.0 153.364 4.330 -999.990 -999.990 1.534 ..P WKT 2010 06 05 08 09 55 31.3200 -97.3300 251.000 457.0 147.393 4.260 -999.990 -999.990 1.474 ..P WKT 2010 06 05 08 14 55 31.3200 -97.3300 251.000 30.0 147.979 4.070 -999.990 -999.990 1.480 ..P WKT 2010 06 05 08 19 55 31.3200 -97.3300 251.000 122.0 173.823 5.160 -999.990 -999.990 1.738 ..P WKT 2010 06 05 08 24 55 31.3200 -97.3300 251.000 457.0 145.942 3.960 -999.990 -999.990 1.459 ..P WKT 2010 06 05 08 34 55 31.3200 -97.3300 251.000 30.0 155.866 3.720 -999.990 -999.990 1.559 ..P WKT 2010 06 05 08 39 55 31.3200 -97.3300 251.000 122.0 169.110 3.490 -999.990 -999.990 1.691 ..P WKT 2010 06 05 08 44 55 31.3200 -97.3300 251.000 457.0 131.566 4.720 -999.990 -999.990 1.316 ..P WKT 2010 06 05 08 49 55 31.3200 -97.3300 251.000 30.0 154.297 4.200 -999.990 -999.990 1.543 ..P WKT 2010 06 05 08 54 55 31.3200 -97.3300 251.000 122.0 169.493 3.530 -999.990 -999.990 1.695 ..P WKT 2010 06 05 08 59 55 31.3200 -97.3300 251.000 457.0 124.974 6.290 -999.990 -999.990 1.250 ..P WKT 2010 06 05 09 09 55 31.3200 -97.3300 251.000 30.0 152.018 6.060 -999.990 -999.990 1.520 ..P WKT 2010 06 05 09 14 55 31.3200 -97.3300 251.000 122.0 171.399 4.010 -999.990 -999.990 1.714 ..P WKT 2010 06 05 09 19 55 31.3200 -97.3300 251.000 457.0 125.489 3.720 -999.990 -999.990 1.255 ..P WKT 2010 06 05 09 24 55 31.3200 -97.3300 251.000 30.0 155.192 4.190 -999.990 -999.990 1.552 ..P WKT 2010 06 05 09 29 55 31.3200 -97.3300 251.000 122.0 164.528 3.690 -999.990 -999.990 1.645 ..P WKT 2010 06 05 09 34 55 31.3200 -97.3300 251.000 457.0 132.291 3.570 -999.990 -999.990 1.323 ..P WKT 2010 06 05 09 44 55 31.3200 -97.3300 251.000 30.0 156.680 3.770 -999.990 -999.990 1.567 ..P WKT 2010 06 05 09 49 55 31.3200 -97.3300 251.000 122.0 153.879 3.410 -999.990 -999.990 1.539 ..P WKT 2010 06 05 09 54 55 31.3200 -97.3300 251.000 457.0 139.082 3.790 -999.990 -999.990 1.391 ..P WKT 2010 06 05 09 59 55 31.3200 -97.3300 251.000 30.0 165.572 3.550 -999.990 -999.990 1.656 ..P WKT 2010 06 05 10 04 55 31.3200 -97.3300 251.000 122.0 146.870 3.550 -999.990 -999.990 1.469 ..P WKT 2010 06 05 10 09 55 31.3200 -97.3300 251.000 457.0 136.537 3.130 -999.990 -999.990 1.365 ..P WKT 2010 06 05 10 19 55 31.3200 -97.3300 251.000 30.0 168.773 3.850 -999.990 -999.990 1.688 ..P WKT 2010 06 05 10 24 55 31.3200 -97.3300 251.000 122.0 145.927 3.490 -999.990 -999.990 1.459 ..P WKT 2010 06 05 10 29 55 31.3200 -97.3300 251.000 457.0 132.008 3.090 -999.990 -999.990 1.320 ..P WKT 2010 06 05 10 34 55 31.3200 -97.3300 251.000 30.0 169.833 3.390 -999.990 -999.990 1.698 ..P WKT 2010 06 05 10 39 55 31.3200 -97.3300 251.000 122.0 149.359 3.260 -999.990 -999.990 1.494 ..P WKT 2010 06 05 10 44 55 31.3200 -97.3300 251.000 457.0 131.258 3.710 -999.990 -999.990 1.313 ..P WKT 2010 06 05 10 54 55 31.3200 -97.3300 251.000 30.0 165.502 3.670 -999.990 -999.990 1.655 ..P WKT 2010 06 05 10 59 55 31.3200 -97.3300 251.000 122.0 140.448 3.320 -999.990 -999.990 1.404 ..P WKT 2010 06 05 11 04 55 31.3200 -97.3300 251.000 457.0 128.365 3.740 -999.990 -999.990 1.284 ..P WKT 2010 06 05 11 09 55 31.3200 -97.3300 251.000 30.0 165.228 3.310 -999.990 -999.990 1.652 ..P WKT 2010 06 05 11 14 55 31.3200 -97.3300 251.000 122.0 142.686 3.680 -999.990 -999.990 1.427 ..P WKT 2010 06 05 11 19 55 31.3200 -97.3300 251.000 457.0 129.627 3.790 -999.990 -999.990 1.296 ..P WKT 2010 06 05 11 29 55 31.3200 -97.3300 251.000 30.0 168.761 5.100 -999.990 -999.990 1.688 ..P WKT 2010 06 05 11 34 55 31.3200 -97.3300 251.000 122.0 144.962 3.190 -999.990 -999.990 1.450 ..P WKT 2010 06 05 11 39 55 31.3200 -97.3300 251.000 457.0 141.240 3.170 -999.990 -999.990 1.412 ..P WKT 2010 06 05 11 44 55 31.3200 -97.3300 251.000 30.0 166.659 4.050 -999.990 -999.990 1.667 ..P WKT 2010 06 05 11 49 55 31.3200 -97.3300 251.000 122.0 149.413 4.340 -999.990 -999.990 1.494 ..P WKT 2010 06 05 12 09 55 31.3200 -97.3300 251.000 457.0 133.010 3.320 -999.990 -999.990 1.330 ..P WKT 2010 06 05 12 10 25 31.3200 -97.3300 251.000 457.0 131.818 3.510 -999.990 -999.990 1.318 ..P WKT 2010 06 05 12 10 55 31.3200 -97.3300 251.000 457.0 132.858 3.320 -999.990 -999.990 1.329 ..P WKT 2010 06 05 12 11 25 31.3200 -97.3300 251.000 457.0 135.433 3.500 -999.990 -999.990 1.354 ..P WKT 2010 06 05 12 11 55 31.3200 -97.3300 251.000 457.0 136.473 3.480 -999.990 -999.990 1.365 ..P WKT 2010 06 05 12 12 25 31.3200 -97.3300 251.000 457.0 133.608 3.360 -999.990 -999.990 1.336 ..P WKT 2010 06 05 12 12 55 31.3200 -97.3300 251.000 457.0 135.763 3.640 -999.990 -999.990 1.358 ..P WKT 2010 06 05 12 13 25 31.3200 -97.3300 251.000 457.0 137.361 3.240 -999.990 -999.990 1.374 ..P WKT 2010 06 05 12 13 55 31.3200 -97.3300 251.000 457.0 135.333 3.680 -999.990 -999.990 1.353 ..P WKT 2010 06 05 12 14 25 31.3200 -97.3300 251.000 457.0 129.678 3.280 -999.990 -999.990 1.297 ..P WKT 2010 06 05 12 14 55 31.3200 -97.3300 251.000 457.0 133.508 4.680 -999.990 -999.990 1.335 ..P WKT 2010 06 05 12 19 55 31.3200 -97.3300 251.000 30.0 163.998 3.640 -999.990 -999.990 1.640 ..P WKT 2010 06 05 12 24 55 31.3200 -97.3300 251.000 122.0 142.877 5.660 -999.990 -999.990 1.429 ..P WKT 2010 06 05 12 29 55 31.3200 -97.3300 251.000 457.0 130.958 4.290 -999.990 -999.990 1.310 ..P WKT 2010 06 05 12 34 55 31.3200 -97.3300 251.000 30.0 158.111 5.410 -999.990 -999.990 1.581 ..P WKT 2010 06 05 12 39 55 31.3200 -97.3300 251.000 122.0 147.587 3.830 -999.990 -999.990 1.476 ..P WKT 2010 06 05 12 44 55 31.3200 -97.3300 251.000 457.0 127.289 3.530 -999.990 -999.990 1.273 ..P WKT 2010 06 05 12 54 55 31.3200 -97.3300 251.000 30.0 157.251 3.580 -999.990 -999.990 1.573 ..P WKT 2010 06 05 12 59 55 31.3200 -97.3300 251.000 122.0 149.716 4.550 -999.990 -999.990 1.497 ..P WKT 2010 06 05 13 04 55 31.3200 -97.3300 251.000 457.0 125.139 4.820 -999.990 -999.990 1.251 ..P WKT 2010 06 05 13 09 55 31.3200 -97.3300 251.000 30.0 151.681 3.780 -999.990 -999.990 1.517 ..P WKT 2010 06 05 13 14 55 31.3200 -97.3300 251.000 122.0 153.642 3.930 -999.990 -999.990 1.536 ..P WKT 2010 06 05 13 19 55 31.3200 -97.3300 251.000 457.0 130.454 4.330 -999.990 -999.990 1.305 ..P WKT 2010 06 05 13 29 55 31.3200 -97.3300 251.000 30.0 152.221 4.850 -999.990 -999.990 1.522 ..P WKT 2010 06 05 13 34 55 31.3200 -97.3300 251.000 122.0 155.540 4.430 -999.990 -999.990 1.555 ..P WKT 2010 06 05 13 39 55 31.3200 -97.3300 251.000 457.0 144.322 4.320 -999.990 -999.990 1.443 ..P WKT 2010 06 05 13 44 55 31.3200 -97.3300 251.000 30.0 151.837 5.580 -999.990 -999.990 1.518 ..P WKT 2010 06 05 13 49 55 31.3200 -97.3300 251.000 122.0 151.802 5.030 -999.990 -999.990 1.518 ..P WKT 2010 06 05 13 54 55 31.3200 -97.3300 251.000 457.0 136.104 5.590 -999.990 -999.990 1.361 ..P WKT 2010 06 05 14 04 55 31.3200 -97.3300 251.000 30.0 152.576 6.070 -999.990 -999.990 1.526 ..P WKT 2010 06 05 14 09 55 31.3200 -97.3300 251.000 122.0 147.965 5.860 -999.990 -999.990 1.480 ..P WKT 2010 06 05 14 14 55 31.3200 -97.3300 251.000 457.0 129.639 6.580 -999.990 -999.990 1.296 ..P WKT 2010 06 05 14 19 55 31.3200 -97.3300 251.000 30.0 138.458 6.000 -999.990 -999.990 1.385 ..P WKT 2010 06 05 14 24 55 31.3200 -97.3300 251.000 122.0 140.001 6.710 -999.990 -999.990 1.400 ..P WKT 2010 06 05 14 29 55 31.3200 -97.3300 251.000 457.0 109.629 6.230 -999.990 -999.990 1.096 ..P WKT 2010 06 05 14 39 55 31.3200 -97.3300 251.000 30.0 134.031 5.870 -999.990 -999.990 1.340 ..P WKT 2010 06 05 14 44 55 31.3200 -97.3300 251.000 122.0 148.918 5.650 -999.990 -999.990 1.489 ..P WKT 2010 06 05 14 49 55 31.3200 -97.3300 251.000 457.0 115.630 5.660 -999.990 -999.990 1.156 ..P WKT 2010 06 05 14 54 55 31.3200 -97.3300 251.000 30.0 139.342 5.400 -999.990 -999.990 1.393 ..P WKT 2010 06 05 14 59 55 31.3200 -97.3300 251.000 122.0 136.444 5.270 -999.990 -999.990 1.364 ..P WKT 2010 06 05 15 04 55 31.3200 -97.3300 251.000 457.0 114.349 4.610 -999.990 -999.990 1.143 ..P WKT 2010 06 05 15 14 55 31.3200 -97.3300 251.000 30.0 132.809 5.660 -999.990 -999.990 1.328 ..P WKT 2010 06 05 15 19 55 31.3200 -97.3300 251.000 122.0 138.759 4.650 -999.990 -999.990 1.388 ..P WKT 2010 06 05 15 24 55 31.3200 -97.3300 251.000 457.0 124.523 4.970 -999.990 -999.990 1.245 ..P WKT 2010 06 05 15 29 55 31.3200 -97.3300 251.000 30.0 135.801 4.950 -999.990 -999.990 1.358 ..P WKT 2010 06 05 15 34 55 31.3200 -97.3300 251.000 122.0 132.920 5.380 -999.990 -999.990 1.329 ..P WKT 2010 06 05 15 39 55 31.3200 -97.3300 251.000 457.0 121.483 5.200 -999.990 -999.990 1.215 ..P WKT 2010 06 05 15 49 55 31.3200 -97.3300 251.000 30.0 142.828 5.750 -999.990 -999.990 1.428 ..P WKT 2010 06 05 15 54 55 31.3200 -97.3300 251.000 122.0 141.669 5.130 -999.990 -999.990 1.417 ..P WKT 2010 06 05 15 59 55 31.3200 -97.3300 251.000 457.0 134.056 4.880 -999.990 -999.990 1.341 ..P WKT 2010 06 05 16 04 55 31.3200 -97.3300 251.000 30.0 139.351 4.850 -999.990 -999.990 1.394 ..P WKT 2010 06 05 16 09 55 31.3200 -97.3300 251.000 122.0 141.560 4.400 -999.990 -999.990 1.416 ..P WKT 2010 06 05 16 14 55 31.3200 -97.3300 251.000 457.0 135.629 4.980 -999.990 -999.990 1.356 ..P WKT 2010 06 05 16 24 55 31.3200 -97.3300 251.000 30.0 143.096 4.240 -999.990 -999.990 1.431 ..P WKT 2010 06 05 16 29 55 31.3200 -97.3300 251.000 122.0 146.952 4.040 -999.990 -999.990 1.470 ..P WKT 2010 06 05 16 34 55 31.3200 -97.3300 251.000 457.0 140.135 4.010 -999.990 -999.990 1.401 ..P WKT 2010 06 05 16 39 55 31.3200 -97.3300 251.000 30.0 142.305 4.060 -999.990 -999.990 1.423 ..P WKT 2010 06 05 16 44 55 31.3200 -97.3300 251.000 122.0 149.535 3.710 -999.990 -999.990 1.495 ..P WKT 2010 06 05 16 49 55 31.3200 -97.3300 251.000 457.0 137.095 4.370 -999.990 -999.990 1.371 ..P WKT 2010 06 05 17 04 55 31.3200 -97.3300 251.000 30.0 134.986 3.730 -999.990 -999.990 1.350 ..P WKT 2010 06 05 17 09 55 31.3200 -97.3300 251.000 122.0 142.124 3.900 -999.990 -999.990 1.421 ..P WKT 2010 06 05 17 14 55 31.3200 -97.3300 251.000 457.0 138.577 3.710 -999.990 -999.990 1.386 ..P WKT 2010 06 05 17 19 55 31.3200 -97.3300 251.000 30.0 139.249 5.010 -999.990 -999.990 1.392 ..P WKT 2010 06 05 17 24 55 31.3200 -97.3300 251.000 122.0 145.546 3.670 -999.990 -999.990 1.455 ..P WKT 2010 06 05 17 29 55 31.3200 -97.3300 251.000 457.0 137.779 3.890 -999.990 -999.990 1.378 ..P WKT 2010 06 05 17 39 55 31.3200 -97.3300 251.000 30.0 145.428 5.060 -999.990 -999.990 1.454 ..P WKT 2010 06 05 17 44 55 31.3200 -97.3300 251.000 122.0 144.809 4.450 -999.990 -999.990 1.448 ..P WKT 2010 06 05 17 49 55 31.3200 -97.3300 251.000 457.0 137.717 4.410 -999.990 -999.990 1.377 ..P WKT 2010 06 05 17 54 55 31.3200 -97.3300 251.000 30.0 137.097 5.140 -999.990 -999.990 1.371 ..P WKT 2010 06 05 17 59 55 31.3200 -97.3300 251.000 122.0 148.019 5.250 -999.990 -999.990 1.480 ..P WKT 2010 06 05 18 04 55 31.3200 -97.3300 251.000 457.0 134.448 5.680 -999.990 -999.990 1.344 ..P WKT 2010 06 05 18 14 55 31.3200 -97.3300 251.000 30.0 137.009 5.650 -999.990 -999.990 1.370 ..P WKT 2010 06 05 18 19 55 31.3200 -97.3300 251.000 122.0 143.290 5.290 -999.990 -999.990 1.433 ..P WKT 2010 06 05 18 24 55 31.3200 -97.3300 251.000 457.0 138.444 6.240 -999.990 -999.990 1.384 ..P WKT 2010 06 05 18 29 55 31.3200 -97.3300 251.000 30.0 138.387 4.840 -999.990 -999.990 1.384 ..P WKT 2010 06 05 18 34 55 31.3200 -97.3300 251.000 122.0 141.430 4.620 -999.990 -999.990 1.414 ..P WKT 2010 06 05 18 39 55 31.3200 -97.3300 251.000 457.0 136.582 4.370 -999.990 -999.990 1.366 ..P WKT 2010 06 05 18 49 55 31.3200 -97.3300 251.000 30.0 133.749 4.260 -999.990 -999.990 1.337 ..P WKT 2010 06 05 18 54 55 31.3200 -97.3300 251.000 122.0 139.008 5.780 -999.990 -999.990 1.390 ..P WKT 2010 06 05 18 59 55 31.3200 -97.3300 251.000 457.0 138.629 4.870 -999.990 -999.990 1.386 ..P WKT 2010 06 05 19 04 55 31.3200 -97.3300 251.000 30.0 139.800 4.350 -999.990 -999.990 1.398 ..P WKT 2010 06 05 19 09 55 31.3200 -97.3300 251.000 122.0 143.230 4.420 -999.990 -999.990 1.432 ..P WKT 2010 06 05 19 14 55 31.3200 -97.3300 251.000 457.0 135.516 4.850 -999.990 -999.990 1.355 ..P WKT 2010 06 05 19 24 55 31.3200 -97.3300 251.000 30.0 134.757 4.680 -999.990 -999.990 1.348 ..P WKT 2010 06 05 19 29 55 31.3200 -97.3300 251.000 122.0 138.750 4.740 -999.990 -999.990 1.387 ..P WKT 2010 06 05 19 34 55 31.3200 -97.3300 251.000 457.0 129.763 5.310 -999.990 -999.990 1.298 ..P WKT 2010 06 05 19 39 55 31.3200 -97.3300 251.000 30.0 136.580 6.110 -999.990 -999.990 1.366 ..P WKT 2010 06 05 19 44 55 31.3200 -97.3300 251.000 122.0 140.152 6.910 -999.990 -999.990 1.402 ..P WKT 2010 06 05 19 49 55 31.3200 -97.3300 251.000 457.0 132.149 4.830 -999.990 -999.990 1.321 ..P WKT 2010 06 05 19 59 55 31.3200 -97.3300 251.000 30.0 131.489 4.830 -999.990 -999.990 1.315 ..P WKT 2010 06 05 20 04 55 31.3200 -97.3300 251.000 122.0 137.000 5.860 -999.990 -999.990 1.370 ..P WKT 2010 06 05 20 09 55 31.3200 -97.3300 251.000 457.0 133.189 6.110 -999.990 -999.990 1.332 ..P WKT 2010 06 05 20 14 55 31.3200 -97.3300 251.000 30.0 137.571 7.360 -999.990 -999.990 1.376 ..P WKT 2010 06 05 20 19 55 31.3200 -97.3300 251.000 122.0 143.084 6.250 -999.990 -999.990 1.431 ..P WKT 2010 06 05 20 24 55 31.3200 -97.3300 251.000 457.0 131.925 4.930 -999.990 -999.990 1.319 ..P WKT 2010 06 05 20 34 55 31.3200 -97.3300 251.000 30.0 137.725 5.660 -999.990 -999.990 1.377 ..P WKT 2010 06 05 20 39 55 31.3200 -97.3300 251.000 122.0 144.514 6.390 -999.990 -999.990 1.445 ..P WKT 2010 06 05 20 44 55 31.3200 -97.3300 251.000 457.0 134.056 7.150 -999.990 -999.990 1.341 ..P WKT 2010 06 05 20 49 55 31.3200 -97.3300 251.000 30.0 133.777 5.890 -999.990 -999.990 1.338 ..P WKT 2010 06 05 20 54 55 31.3200 -97.3300 251.000 122.0 142.548 4.870 -999.990 -999.990 1.425 ..P WKT 2010 06 05 20 59 55 31.3200 -97.3300 251.000 457.0 130.105 5.090 -999.990 -999.990 1.301 ..P WKT 2010 06 05 21 09 55 31.3200 -97.3300 251.000 30.0 133.465 5.160 -999.990 -999.990 1.335 ..P WKT 2010 06 05 21 14 55 31.3200 -97.3300 251.000 122.0 139.087 5.200 -999.990 -999.990 1.391 ..P WKT 2010 06 05 21 19 55 31.3200 -97.3300 251.000 457.0 130.276 5.290 -999.990 -999.990 1.303 ..P WKT 2010 06 05 21 24 55 31.3200 -97.3300 251.000 30.0 134.484 5.890 -999.990 -999.990 1.345 ..P WKT 2010 06 05 21 29 55 31.3200 -97.3300 251.000 122.0 146.054 4.660 -999.990 -999.990 1.461 ..P WKT 2010 06 05 21 34 55 31.3200 -97.3300 251.000 457.0 138.090 4.720 -999.990 -999.990 1.381 ..P WKT 2010 06 05 21 44 55 31.3200 -97.3300 251.000 30.0 135.365 4.500 -999.990 -999.990 1.354 ..P WKT 2010 06 05 21 49 55 31.3200 -97.3300 251.000 122.0 144.007 4.350 -999.990 -999.990 1.440 ..P WKT 2010 06 05 21 54 55 31.3200 -97.3300 251.000 457.0 137.638 4.700 -999.990 -999.990 1.376 ..P WKT 2010 06 05 21 59 55 31.3200 -97.3300 251.000 30.0 134.949 4.540 -999.990 -999.990 1.349 ..P WKT 2010 06 05 22 04 55 31.3200 -97.3300 251.000 122.0 144.445 4.630 -999.990 -999.990 1.444 ..P WKT 2010 06 05 22 09 55 31.3200 -97.3300 251.000 457.0 141.757 4.770 -999.990 -999.990 1.418 ..P WKT 2010 06 05 22 19 55 31.3200 -97.3300 251.000 30.0 137.593 4.700 -999.990 -999.990 1.376 ..P WKT 2010 06 05 22 24 55 31.3200 -97.3300 251.000 122.0 142.214 4.830 -999.990 -999.990 1.422 ..P WKT 2010 06 05 22 29 55 31.3200 -97.3300 251.000 457.0 136.770 5.180 -999.990 -999.990 1.368 ..P WKT 2010 06 05 22 34 55 31.3200 -97.3300 251.000 30.0 134.443 5.940 -999.990 -999.990 1.344 ..P WKT 2010 06 05 22 39 55 31.3200 -97.3300 251.000 122.0 150.127 5.670 -999.990 -999.990 1.501 ..P WKT 2010 06 05 22 44 55 31.3200 -97.3300 251.000 457.0 131.349 4.870 -999.990 -999.990 1.313 ..P WKT 2010 06 05 22 54 55 31.3200 -97.3300 251.000 30.0 140.251 4.960 -999.990 -999.990 1.403 ..P WKT 2010 06 05 22 59 55 31.3200 -97.3300 251.000 122.0 148.222 5.670 -999.990 -999.990 1.482 ..P WKT 2010 06 05 23 04 55 31.3200 -97.3300 251.000 457.0 150.234 5.360 -999.990 -999.990 1.502 ..P WKT 2010 06 05 23 09 55 31.3200 -97.3300 251.000 30.0 147.562 5.160 -999.990 -999.990 1.476 ..P WKT 2010 06 05 23 14 55 31.3200 -97.3300 251.000 122.0 148.580 6.360 -999.990 -999.990 1.486 ..P WKT 2010 06 05 23 19 55 31.3200 -97.3300 251.000 457.0 143.211 6.610 -999.990 -999.990 1.432 ..P WKT 2010 06 05 23 29 55 31.3200 -97.3300 251.000 30.0 147.287 5.990 -999.990 -999.990 1.473 ..P WKT 2010 06 05 23 34 55 31.3200 -97.3300 251.000 122.0 157.872 5.260 -999.990 -999.990 1.579 ..P WKT 2010 06 05 23 39 55 31.3200 -97.3300 251.000 457.0 150.705 5.540 -999.990 -999.990 1.507 ..P WKT 2010 06 05 23 44 55 31.3200 -97.3300 251.000 30.0 148.082 5.430 -999.990 -999.990 1.481 ..P WKT 2010 06 05 23 49 55 31.3200 -97.3300 251.000 122.0 151.568 5.700 -999.990 -999.990 1.516 ..P WKT 2010 06 06 00 09 55 31.3200 -97.3300 251.000 457.0 145.841 5.850 -999.990 -999.990 1.458 ..P WKT 2010 06 06 00 10 25 31.3200 -97.3300 251.000 457.0 146.376 6.130 -999.990 -999.990 1.464 ..P WKT 2010 06 06 00 10 55 31.3200 -97.3300 251.000 457.0 148.616 5.460 -999.990 -999.990 1.486 ..P WKT 2010 06 06 00 11 25 31.3200 -97.3300 251.000 457.0 144.318 5.860 -999.990 -999.990 1.443 ..P WKT 2010 06 06 00 11 55 31.3200 -97.3300 251.000 457.0 146.559 5.590 -999.990 -999.990 1.466 ..P WKT 2010 06 06 00 12 25 31.3200 -97.3300 251.000 457.0 149.084 5.450 -999.990 -999.990 1.491 ..P WKT 2010 06 06 00 12 55 31.3200 -97.3300 251.000 457.0 147.628 5.920 -999.990 -999.990 1.476 ..P WKT 2010 06 06 00 13 25 31.3200 -97.3300 251.000 457.0 143.045 5.680 -999.990 -999.990 1.430 ..P WKT 2010 06 06 00 13 55 31.3200 -97.3300 251.000 457.0 151.825 5.990 -999.990 -999.990 1.518 ..P WKT 2010 06 06 00 14 25 31.3200 -97.3300 251.000 457.0 147.527 5.810 -999.990 -999.990 1.475 ..P WKT 2010 06 06 00 14 55 31.3200 -97.3300 251.000 457.0 147.209 5.740 -999.990 -999.990 1.472 ..P WKT 2010 06 06 00 19 55 31.3200 -97.3300 251.000 30.0 144.312 5.540 -999.990 -999.990 1.443 ..P WKT 2010 06 06 00 24 55 31.3200 -97.3300 251.000 122.0 145.964 5.230 -999.990 -999.990 1.460 ..P WKT 2010 06 06 00 29 55 31.3200 -97.3300 251.000 457.0 147.332 5.220 -999.990 -999.990 1.473 ..P WKT 2010 06 06 00 34 55 31.3200 -97.3300 251.000 30.0 151.262 5.140 -999.990 -999.990 1.513 ..P WKT 2010 06 06 00 39 55 31.3200 -97.3300 251.000 122.0 154.624 4.960 -999.990 -999.990 1.546 ..P WKT 2010 06 06 00 44 55 31.3200 -97.3300 251.000 457.0 148.026 5.240 -999.990 -999.990 1.480 ..P WKT 2010 06 06 00 54 55 31.3200 -97.3300 251.000 30.0 143.378 4.740 -999.990 -999.990 1.434 ..P WKT 2010 06 06 00 59 55 31.3200 -97.3300 251.000 122.0 155.579 5.520 -999.990 -999.990 1.556 ..P WKT 2010 06 06 01 04 55 31.3200 -97.3300 251.000 457.0 148.137 4.820 -999.990 -999.990 1.481 ..P WKT 2010 06 06 01 09 55 31.3200 -97.3300 251.000 30.0 145.250 5.300 -999.990 -999.990 1.453 ..P WKT 2010 06 06 01 14 55 31.3200 -97.3300 251.000 122.0 156.031 5.330 -999.990 -999.990 1.560 ..P WKT 2010 06 06 01 19 55 31.3200 -97.3300 251.000 457.0 142.036 6.010 -999.990 -999.990 1.420 ..P WKT 2010 06 06 01 29 55 31.3200 -97.3300 251.000 30.0 160.840 4.970 -999.990 -999.990 1.608 ..P WKT 2010 06 06 01 34 55 31.3200 -97.3300 251.000 122.0 162.877 5.650 -999.990 -999.990 1.629 ..P WKT 2010 06 06 01 39 55 31.3200 -97.3300 251.000 457.0 146.107 4.820 -999.990 -999.990 1.461 ..P WKT 2010 06 06 01 44 55 31.3200 -97.3300 251.000 30.0 156.979 5.120 -999.990 -999.990 1.570 ..P WKT 2010 06 06 01 49 55 31.3200 -97.3300 251.000 122.0 152.461 5.020 -999.990 -999.990 1.525 ..P WKT 2010 06 06 01 54 55 31.3200 -97.3300 251.000 457.0 139.816 4.720 -999.990 -999.990 1.398 ..P WKT 2010 06 06 02 04 55 31.3200 -97.3300 251.000 30.0 158.698 4.590 -999.990 -999.990 1.587 ..P WKT 2010 06 06 02 09 55 31.3200 -97.3300 251.000 122.0 151.733 4.610 -999.990 -999.990 1.517 ..P WKT 2010 06 06 02 14 55 31.3200 -97.3300 251.000 457.0 146.763 4.760 -999.990 -999.990 1.468 ..P WKT 2010 06 06 02 19 55 31.3200 -97.3300 251.000 30.0 152.204 5.180 -999.990 -999.990 1.522 ..P WKT 2010 06 06 02 24 55 31.3200 -97.3300 251.000 122.0 159.501 4.480 -999.990 -999.990 1.595 ..P WKT 2010 06 06 02 29 55 31.3200 -97.3300 251.000 457.0 152.532 4.550 -999.990 -999.990 1.525 ..P WKT 2010 06 06 02 39 55 31.3200 -97.3300 251.000 30.0 149.824 4.510 -999.990 -999.990 1.498 ..P WKT 2010 06 06 02 44 55 31.3200 -97.3300 251.000 122.0 155.086 4.630 -999.990 -999.990 1.551 ..P WKT 2010 06 06 02 49 55 31.3200 -97.3300 251.000 457.0 154.210 6.780 -999.990 -999.990 1.542 ..P WKT 2010 06 06 02 54 55 31.3200 -97.3300 251.000 30.0 146.054 5.550 -999.990 -999.990 1.461 ..P WKT 2010 06 06 02 59 55 31.3200 -97.3300 251.000 122.0 152.888 5.540 -999.990 -999.990 1.529 ..P WKT 2010 06 06 03 04 55 31.3200 -97.3300 251.000 457.0 150.584 5.650 -999.990 -999.990 1.506 ..P WKT 2010 06 06 03 14 55 31.3200 -97.3300 251.000 30.0 148.301 5.800 -999.990 -999.990 1.483 ..P WKT 2010 06 06 03 19 55 31.3200 -97.3300 251.000 122.0 149.751 5.580 -999.990 -999.990 1.498 ..P WKT 2010 06 06 03 24 55 31.3200 -97.3300 251.000 457.0 158.345 5.490 -999.990 -999.990 1.583 ..P WKT 2010 06 06 03 29 55 31.3200 -97.3300 251.000 30.0 156.367 4.940 -999.990 -999.990 1.564 ..P WKT 2010 06 06 03 34 55 31.3200 -97.3300 251.000 122.0 153.245 4.820 -999.990 -999.990 1.532 ..P WKT 2010 06 06 03 39 55 31.3200 -97.3300 251.000 457.0 145.262 4.970 -999.990 -999.990 1.453 ..P WKT 2010 06 06 03 49 55 31.3200 -97.3300 251.000 30.0 151.779 4.590 -999.990 -999.990 1.518 ..P WKT 2010 06 06 03 54 55 31.3200 -97.3300 251.000 122.0 153.414 4.570 -999.990 -999.990 1.534 ..P WKT 2010 06 06 03 59 55 31.3200 -97.3300 251.000 457.0 144.324 4.990 -999.990 -999.990 1.443 ..P WKT 2010 06 06 04 04 55 31.3200 -97.3300 251.000 30.0 156.258 4.270 -999.990 -999.990 1.563 ..P WKT 2010 06 06 04 09 55 31.3200 -97.3300 251.000 122.0 153.316 4.120 -999.990 -999.990 1.533 ..P WKT 2010 06 06 04 14 55 31.3200 -97.3300 251.000 457.0 150.089 4.090 -999.990 -999.990 1.501 ..P WKT 2010 06 06 04 24 55 31.3200 -97.3300 251.000 30.0 163.502 4.350 -999.990 -999.990 1.635 ..P WKT 2010 06 06 04 29 55 31.3200 -97.3300 251.000 122.0 160.111 4.160 -999.990 -999.990 1.601 ..P WKT 2010 06 06 04 34 55 31.3200 -97.3300 251.000 457.0 155.287 4.750 -999.990 -999.990 1.553 ..P WKT 2010 06 06 04 39 55 31.3200 -97.3300 251.000 30.0 158.193 4.590 -999.990 -999.990 1.582 ..P WKT 2010 06 06 04 44 55 31.3200 -97.3300 251.000 122.0 154.800 4.130 -999.990 -999.990 1.548 ..P WKT 2010 06 06 04 49 55 31.3200 -97.3300 251.000 457.0 148.827 4.100 -999.990 -999.990 1.488 ..P WKT 2010 06 06 05 04 55 31.3200 -97.3300 251.000 30.0 155.687 3.900 -999.990 -999.990 1.557 ..P WKT 2010 06 06 05 09 55 31.3200 -97.3300 251.000 122.0 153.938 3.970 -999.990 -999.990 1.539 ..P WKT 2010 06 06 05 14 55 31.3200 -97.3300 251.000 457.0 147.317 5.330 -999.990 -999.990 1.473 ..P WKT 2010 06 06 05 19 55 31.3200 -97.3300 251.000 30.0 149.007 3.800 -999.990 -999.990 1.490 ..P WKT 2010 06 06 05 24 55 31.3200 -97.3300 251.000 122.0 151.557 3.700 -999.990 -999.990 1.516 ..P WKT 2010 06 06 05 29 55 31.3200 -97.3300 251.000 457.0 149.521 3.560 -999.990 -999.990 1.495 ..P WKT 2010 06 06 05 39 55 31.3200 -97.3300 251.000 30.0 152.791 3.850 -999.990 -999.990 1.528 ..P WKT 2010 06 06 05 44 55 31.3200 -97.3300 251.000 122.0 155.517 4.280 -999.990 -999.990 1.555 ..P WKT 2010 06 06 05 49 55 31.3200 -97.3300 251.000 457.0 141.892 3.830 -999.990 -999.990 1.419 ..P WKT 2010 06 06 05 54 55 31.3200 -97.3300 251.000 30.0 148.922 4.990 -999.990 -999.990 1.489 ..P WKT 2010 06 06 05 59 55 31.3200 -97.3300 251.000 122.0 147.631 3.550 -999.990 -999.990 1.476 ..P WKT 2010 06 06 06 04 55 31.3200 -97.3300 251.000 457.0 131.560 4.000 -999.990 -999.990 1.316 ..P WKT 2010 06 06 06 14 55 31.3200 -97.3300 251.000 30.0 145.972 4.780 -999.990 -999.990 1.460 ..P WKT 2010 06 06 06 19 55 31.3200 -97.3300 251.000 122.0 157.805 4.540 -999.990 -999.990 1.578 ..P WKT 2010 06 06 06 24 55 31.3200 -97.3300 251.000 457.0 141.645 3.920 -999.990 -999.990 1.416 ..P WKT 2010 06 06 06 29 55 31.3200 -97.3300 251.000 30.0 150.035 4.040 -999.990 -999.990 1.500 ..P WKT 2010 06 06 06 34 55 31.3200 -97.3300 251.000 122.0 154.549 4.360 -999.990 -999.990 1.545 ..P WKT 2010 06 06 06 39 55 31.3200 -97.3300 251.000 457.0 139.388 4.060 -999.990 -999.990 1.394 ..P WKT 2010 06 06 06 49 55 31.3200 -97.3300 251.000 30.0 147.659 3.420 -999.990 -999.990 1.477 ..P WKT 2010 06 06 06 54 55 31.3200 -97.3300 251.000 122.0 155.439 3.970 -999.990 -999.990 1.554 ..P WKT 2010 06 06 06 59 55 31.3200 -97.3300 251.000 457.0 148.707 4.670 -999.990 -999.990 1.487 ..P WKT 2010 06 06 07 04 55 31.3200 -97.3300 251.000 30.0 149.734 3.910 -999.990 -999.990 1.497 ..P WKT 2010 06 06 07 09 55 31.3200 -97.3300 251.000 122.0 150.043 3.500 -999.990 -999.990 1.500 ..P WKT 2010 06 06 07 14 55 31.3200 -97.3300 251.000 457.0 152.653 3.410 -999.990 -999.990 1.527 ..P WKT 2010 06 06 07 24 55 31.3200 -97.3300 251.000 30.0 145.774 3.210 -999.990 -999.990 1.458 ..P WKT 2010 06 06 07 29 55 31.3200 -97.3300 251.000 122.0 157.423 3.600 -999.990 -999.990 1.574 ..P WKT 2010 06 06 07 34 55 31.3200 -97.3300 251.000 457.0 150.090 6.940 -999.990 -999.990 1.501 ..P WKT 2010 06 06 07 39 55 31.3200 -97.3300 251.000 30.0 153.400 4.450 -999.990 -999.990 1.534 ..P WKT 2010 06 06 07 44 55 31.3200 -97.3300 251.000 122.0 155.559 5.030 -999.990 -999.990 1.556 ..P WKT 2010 06 06 07 49 55 31.3200 -97.3300 251.000 457.0 148.366 5.630 -999.990 -999.990 1.484 ..P WKT 2010 06 06 07 59 55 31.3200 -97.3300 251.000 30.0 152.644 6.020 -999.990 -999.990 1.526 ..P WKT 2010 06 06 08 04 55 31.3200 -97.3300 251.000 122.0 161.817 5.560 -999.990 -999.990 1.618 ..P WKT 2010 06 06 08 09 55 31.3200 -97.3300 251.000 457.0 152.853 4.600 -999.990 -999.990 1.529 ..P WKT 2010 06 06 08 14 55 31.3200 -97.3300 251.000 30.0 157.709 4.450 -999.990 -999.990 1.577 ..P WKT 2010 06 06 08 19 55 31.3200 -97.3300 251.000 122.0 163.718 3.930 -999.990 -999.990 1.637 ..P WKT 2010 06 06 08 24 55 31.3200 -97.3300 251.000 457.0 165.120 3.580 -999.990 -999.990 1.651 ..P WKT 2010 06 06 08 34 55 31.3200 -97.3300 251.000 30.0 156.771 3.110 -999.990 -999.990 1.568 ..P WKT 2010 06 06 08 39 55 31.3200 -97.3300 251.000 122.0 166.322 3.780 -999.990 -999.990 1.663 ..P WKT 2010 06 06 08 44 55 31.3200 -97.3300 251.000 457.0 165.215 3.690 -999.990 -999.990 1.652 ..P WKT 2010 06 06 08 49 55 31.3200 -97.3300 251.000 30.0 161.511 4.240 -999.990 -999.990 1.615 ..P WKT 2010 06 06 08 54 55 31.3200 -97.3300 251.000 122.0 159.249 3.680 -999.990 -999.990 1.592 ..P WKT 2010 06 06 08 59 55 31.3200 -97.3300 251.000 457.0 159.869 3.850 -999.990 -999.990 1.599 ..P WKT 2010 06 06 09 09 55 31.3200 -97.3300 251.000 30.0 164.694 3.020 -999.990 -999.990 1.647 ..P WKT 2010 06 06 09 14 55 31.3200 -97.3300 251.000 122.0 168.034 3.760 -999.990 -999.990 1.680 ..P WKT 2010 06 06 09 19 55 31.3200 -97.3300 251.000 457.0 163.876 4.170 -999.990 -999.990 1.639 ..P WKT 2010 06 06 09 24 55 31.3200 -97.3300 251.000 30.0 167.794 6.420 -999.990 -999.990 1.678 ..P WKT 2010 06 06 09 29 55 31.3200 -97.3300 251.000 122.0 171.713 4.490 -999.990 -999.990 1.717 ..P WKT 2010 06 06 09 34 55 31.3200 -97.3300 251.000 457.0 153.702 3.850 -999.990 -999.990 1.537 ..P WKT 2010 06 06 09 44 55 31.3200 -97.3300 251.000 30.0 177.209 5.120 -999.990 -999.990 1.772 ..P WKT 2010 06 06 09 49 55 31.3200 -97.3300 251.000 122.0 177.461 4.420 -999.990 -999.990 1.775 ..P WKT 2010 06 06 09 54 55 31.3200 -97.3300 251.000 457.0 164.865 5.430 -999.990 -999.990 1.649 ..P WKT 2010 06 06 09 59 55 31.3200 -97.3300 251.000 30.0 172.190 4.120 -999.990 -999.990 1.722 ..P WKT 2010 06 06 10 04 55 31.3200 -97.3300 251.000 122.0 175.185 4.170 -999.990 -999.990 1.752 ..P WKT 2010 06 06 10 09 55 31.3200 -97.3300 251.000 457.0 157.385 3.160 -999.990 -999.990 1.574 ..P WKT 2010 06 06 10 19 55 31.3200 -97.3300 251.000 30.0 173.465 4.920 -999.990 -999.990 1.735 ..P WKT 2010 06 06 10 24 55 31.3200 -97.3300 251.000 122.0 182.509 4.190 -999.990 -999.990 1.825 ..P WKT 2010 06 06 10 29 55 31.3200 -97.3300 251.000 457.0 159.044 4.310 -999.990 -999.990 1.590 ..P WKT 2010 06 06 10 34 55 31.3200 -97.3300 251.000 30.0 169.534 4.320 -999.990 -999.990 1.695 ..P WKT 2010 06 06 10 39 55 31.3200 -97.3300 251.000 122.0 174.823 3.310 -999.990 -999.990 1.748 ..P WKT 2010 06 06 10 44 55 31.3200 -97.3300 251.000 457.0 162.913 3.500 -999.990 -999.990 1.629 ..P WKT 2010 06 06 10 54 55 31.3200 -97.3300 251.000 30.0 166.533 3.100 -999.990 -999.990 1.665 ..P WKT 2010 06 06 10 59 55 31.3200 -97.3300 251.000 122.0 170.358 3.600 -999.990 -999.990 1.704 ..P WKT 2010 06 06 11 04 55 31.3200 -97.3300 251.000 457.0 165.506 3.330 -999.990 -999.990 1.655 ..P WKT 2010 06 06 11 09 55 31.3200 -97.3300 251.000 30.0 167.307 4.220 -999.990 -999.990 1.673 ..P WKT 2010 06 06 11 14 55 31.3200 -97.3300 251.000 122.0 176.341 3.780 -999.990 -999.990 1.763 ..P WKT 2010 06 06 11 19 55 31.3200 -97.3300 251.000 457.0 165.847 3.620 -999.990 -999.990 1.658 ..P WKT 2010 06 06 11 29 55 31.3200 -97.3300 251.000 30.0 170.858 3.930 -999.990 -999.990 1.709 ..P WKT 2010 06 06 11 34 55 31.3200 -97.3300 251.000 122.0 174.793 3.450 -999.990 -999.990 1.748 ..P WKT 2010 06 06 11 39 55 31.3200 -97.3300 251.000 457.0 159.911 4.400 -999.990 -999.990 1.599 ..P WKT 2010 06 06 11 44 55 31.3200 -97.3300 251.000 30.0 165.872 4.100 -999.990 -999.990 1.659 ..P WKT 2010 06 06 11 49 55 31.3200 -97.3300 251.000 122.0 177.337 4.090 -999.990 -999.990 1.773 ..P WKT 2010 06 06 12 09 55 31.3200 -97.3300 251.000 457.0 155.938 4.130 -999.990 -999.990 1.559 ..P WKT 2010 06 06 12 10 25 31.3200 -97.3300 251.000 457.0 164.110 3.690 -999.990 -999.990 1.641 ..P WKT 2010 06 06 12 10 55 31.3200 -97.3300 251.000 457.0 165.912 3.390 -999.990 -999.990 1.659 ..P WKT 2010 06 06 12 11 25 31.3200 -97.3300 251.000 457.0 159.895 3.410 -999.990 -999.990 1.599 ..P WKT 2010 06 06 12 11 55 31.3200 -97.3300 251.000 457.0 160.828 2.820 -999.990 -999.990 1.608 ..P WKT 2010 06 06 12 12 25 31.3200 -97.3300 251.000 457.0 156.838 3.680 -999.990 -999.990 1.568 ..P WKT 2010 06 06 12 12 55 31.3200 -97.3300 251.000 457.0 156.034 3.790 -999.990 -999.990 1.560 ..P WKT 2010 06 06 12 13 25 31.3200 -97.3300 251.000 457.0 158.704 4.340 -999.990 -999.990 1.587 ..P WKT 2010 06 06 12 13 55 31.3200 -97.3300 251.000 457.0 161.663 3.450 -999.990 -999.990 1.617 ..P WKT 2010 06 06 12 14 25 31.3200 -97.3300 251.000 457.0 157.674 3.700 -999.990 -999.990 1.577 ..P WKT 2010 06 06 12 14 55 31.3200 -97.3300 251.000 457.0 156.001 3.530 -999.990 -999.990 1.560 ..P WKT 2010 06 06 12 19 55 31.3200 -97.3300 251.000 30.0 170.825 4.380 -999.990 -999.990 1.708 ..P WKT 2010 06 06 12 24 55 31.3200 -97.3300 251.000 122.0 175.514 4.740 -999.990 -999.990 1.755 ..P WKT 2010 06 06 12 29 55 31.3200 -97.3300 251.000 457.0 165.446 4.170 -999.990 -999.990 1.654 ..P WKT 2010 06 06 12 34 55 31.3200 -97.3300 251.000 30.0 168.400 3.260 -999.990 -999.990 1.684 ..P WKT 2010 06 06 12 39 55 31.3200 -97.3300 251.000 122.0 179.449 3.160 -999.990 -999.990 1.794 ..P WKT 2010 06 06 12 44 55 31.3200 -97.3300 251.000 457.0 170.255 4.280 -999.990 -999.990 1.703 ..P WKT 2010 06 06 12 54 55 31.3200 -97.3300 251.000 30.0 166.850 2.440 -999.990 -999.990 1.668 ..P WKT 2010 06 06 12 59 55 31.3200 -97.3300 251.000 122.0 178.124 4.820 -999.990 -999.990 1.781 ..P WKT 2010 06 06 13 04 55 31.3200 -97.3300 251.000 457.0 164.549 3.030 -999.990 -999.990 1.645 ..P WKT 2010 06 06 13 09 55 31.3200 -97.3300 251.000 30.0 167.443 3.800 -999.990 -999.990 1.674 ..P WKT 2010 06 06 13 14 55 31.3200 -97.3300 251.000 122.0 170.047 3.700 -999.990 -999.990 1.700 ..P WKT 2010 06 06 13 19 55 31.3200 -97.3300 251.000 457.0 162.258 2.570 -999.990 -999.990 1.623 ..P WKT 2010 06 06 13 29 55 31.3200 -97.3300 251.000 30.0 179.913 3.170 -999.990 -999.990 1.799 ..P WKT 2010 06 06 13 34 55 31.3200 -97.3300 251.000 122.0 181.688 3.100 -999.990 -999.990 1.817 ..P WKT 2010 06 06 13 39 55 31.3200 -97.3300 251.000 457.0 169.328 3.800 -999.990 -999.990 1.693 ..P WKT 2010 06 06 13 44 55 31.3200 -97.3300 251.000 30.0 177.448 4.310 -999.990 -999.990 1.774 ..P WKT 2010 06 06 13 49 55 31.3200 -97.3300 251.000 122.0 180.663 4.270 -999.990 -999.990 1.807 ..P WKT 2010 06 06 13 54 55 31.3200 -97.3300 251.000 457.0 174.798 3.210 -999.990 -999.990 1.748 ..P WKT 2010 06 06 14 04 55 31.3200 -97.3300 251.000 30.0 177.192 3.430 -999.990 -999.990 1.772 ..P WKT 2010 06 06 14 09 55 31.3200 -97.3300 251.000 122.0 180.404 4.880 -999.990 -999.990 1.804 ..P WKT 2010 06 06 14 14 55 31.3200 -97.3300 251.000 457.0 178.864 4.150 -999.990 -999.990 1.789 ..P WKT 2010 06 06 14 19 55 31.3200 -97.3300 251.000 30.0 175.885 4.780 -999.990 -999.990 1.759 ..P WKT 2010 06 06 14 24 55 31.3200 -97.3300 251.000 122.0 177.656 4.210 -999.990 -999.990 1.777 ..P WKT 2010 06 06 14 29 55 31.3200 -97.3300 251.000 457.0 175.253 4.090 -999.990 -999.990 1.753 ..P WKT 2010 06 06 14 39 55 31.3200 -97.3300 251.000 30.0 167.328 4.310 -999.990 -999.990 1.673 ..P WKT 2010 06 06 14 44 55 31.3200 -97.3300 251.000 122.0 174.894 3.710 -999.990 -999.990 1.749 ..P WKT 2010 06 06 14 49 55 31.3200 -97.3300 251.000 457.0 166.496 4.090 -999.990 -999.990 1.665 ..P WKT 2010 06 06 14 54 55 31.3200 -97.3300 251.000 30.0 177.221 3.670 -999.990 -999.990 1.772 ..P WKT 2010 06 06 14 59 55 31.3200 -97.3300 251.000 122.0 178.456 4.530 -999.990 -999.990 1.785 ..P WKT 2010 06 06 15 04 55 31.3200 -97.3300 251.000 457.0 172.793 3.640 -999.990 -999.990 1.728 ..P WKT 2010 06 06 15 14 55 31.3200 -97.3300 251.000 30.0 173.909 3.990 -999.990 -999.990 1.739 ..P WKT 2010 06 06 15 19 55 31.3200 -97.3300 251.000 122.0 179.390 4.090 -999.990 -999.990 1.794 ..P WKT 2010 06 06 15 24 55 31.3200 -97.3300 251.000 457.0 169.937 4.950 -999.990 -999.990 1.699 ..P WKT 2010 06 06 15 29 55 31.3200 -97.3300 251.000 30.0 166.517 5.300 -999.990 -999.990 1.665 ..P WKT 2010 06 06 15 34 55 31.3200 -97.3300 251.000 122.0 177.737 4.410 -999.990 -999.990 1.777 ..P WKT 2010 06 06 15 39 55 31.3200 -97.3300 251.000 457.0 165.277 3.320 -999.990 -999.990 1.653 ..P WKT 2010 06 06 15 49 55 31.3200 -97.3300 251.000 30.0 168.546 3.580 -999.990 -999.990 1.685 ..P WKT 2010 06 06 15 54 55 31.3200 -97.3300 251.000 122.0 170.066 5.980 -999.990 -999.990 1.701 ..P WKT 2010 06 06 15 59 55 31.3200 -97.3300 251.000 457.0 158.398 5.310 -999.990 -999.990 1.584 ..P WKT 2010 06 06 16 04 55 31.3200 -97.3300 251.000 30.0 171.673 6.000 -999.990 -999.990 1.717 ..P WKT 2010 06 06 16 09 55 31.3200 -97.3300 251.000 122.0 168.319 4.980 -999.990 -999.990 1.683 ..P WKT 2010 06 06 16 14 55 31.3200 -97.3300 251.000 457.0 167.546 3.850 -999.990 -999.990 1.675 ..P WKT 2010 06 06 16 24 55 31.3200 -97.3300 251.000 30.0 170.952 3.710 -999.990 -999.990 1.710 ..P WKT 2010 06 06 16 29 55 31.3200 -97.3300 251.000 122.0 179.424 4.890 -999.990 -999.990 1.794 ..P WKT 2010 06 06 16 34 55 31.3200 -97.3300 251.000 457.0 172.719 5.560 -999.990 -999.990 1.727 ..P WKT 2010 06 06 16 39 55 31.3200 -97.3300 251.000 30.0 168.880 4.400 -999.990 -999.990 1.689 ..P WKT 2010 06 06 16 44 55 31.3200 -97.3300 251.000 122.0 175.629 3.280 -999.990 -999.990 1.756 ..P WKT 2010 06 06 16 49 55 31.3200 -97.3300 251.000 457.0 170.361 2.550 -999.990 -999.990 1.704 ..P WKT 2010 06 06 17 04 55 31.3200 -97.3300 251.000 30.0 161.163 3.220 -999.990 -999.990 1.612 ..P WKT 2010 06 06 17 09 55 31.3200 -97.3300 251.000 122.0 173.063 3.420 -999.990 -999.990 1.731 ..P WKT 2010 06 06 17 14 55 31.3200 -97.3300 251.000 457.0 160.666 3.870 -999.990 -999.990 1.607 ..P WKT 2010 06 06 17 19 55 31.3200 -97.3300 251.000 30.0 166.560 3.430 -999.990 -999.990 1.666 ..P WKT 2010 06 06 17 24 55 31.3200 -97.3300 251.000 122.0 176.451 3.600 -999.990 -999.990 1.765 ..P WKT 2010 06 06 17 29 55 31.3200 -97.3300 251.000 457.0 162.062 3.840 -999.990 -999.990 1.621 ..P WKT 2010 06 06 17 39 55 31.3200 -97.3300 251.000 30.0 168.446 4.950 -999.990 -999.990 1.684 ..P WKT 2010 06 06 17 44 55 31.3200 -97.3300 251.000 122.0 170.368 3.820 -999.990 -999.990 1.704 ..P WKT 2010 06 06 17 49 55 31.3200 -97.3300 251.000 457.0 165.297 4.940 -999.990 -999.990 1.653 ..P WKT 2010 06 06 17 54 55 31.3200 -97.3300 251.000 30.0 161.084 5.020 -999.990 -999.990 1.611 ..P WKT 2010 06 06 17 59 55 31.3200 -97.3300 251.000 122.0 171.278 3.520 -999.990 -999.990 1.713 ..P WKT 2010 06 06 18 04 55 31.3200 -97.3300 251.000 457.0 160.078 3.750 -999.990 -999.990 1.601 ..P WKT 2010 06 06 18 14 55 31.3200 -97.3300 251.000 30.0 162.331 4.270 -999.990 -999.990 1.623 ..P WKT 2010 06 06 18 19 55 31.3200 -97.3300 251.000 122.0 168.077 3.100 -999.990 -999.990 1.681 ..P WKT 2010 06 06 18 24 55 31.3200 -97.3300 251.000 457.0 166.129 2.970 -999.990 -999.990 1.661 ..P WKT 2010 06 06 18 29 55 31.3200 -97.3300 251.000 30.0 169.023 3.640 -999.990 -999.990 1.690 ..P WKT 2010 06 06 18 34 55 31.3200 -97.3300 251.000 122.0 172.629 3.660 -999.990 -999.990 1.726 ..P WKT 2010 06 06 18 39 55 31.3200 -97.3300 251.000 457.0 164.273 3.040 -999.990 -999.990 1.643 ..P WKT 2010 06 06 18 49 55 31.3200 -97.3300 251.000 30.0 158.246 3.810 -999.990 -999.990 1.582 ..P WKT 2010 06 06 18 54 55 31.3200 -97.3300 251.000 122.0 165.977 3.460 -999.990 -999.990 1.660 ..P WKT 2010 06 06 18 59 55 31.3200 -97.3300 251.000 457.0 168.299 3.280 -999.990 -999.990 1.683 ..P WKT 2010 06 06 19 04 55 31.3200 -97.3300 251.000 30.0 168.914 3.570 -999.990 -999.990 1.689 ..P WKT 2010 06 06 19 09 55 31.3200 -97.3300 251.000 122.0 176.353 3.740 -999.990 -999.990 1.764 ..P WKT 2010 06 06 19 14 55 31.3200 -97.3300 251.000 457.0 168.151 3.980 -999.990 -999.990 1.682 ..P WKT 2010 06 06 19 24 55 31.3200 -97.3300 251.000 30.0 165.623 4.800 -999.990 -999.990 1.656 ..P WKT 2010 06 06 19 29 55 31.3200 -97.3300 251.000 122.0 176.974 3.650 -999.990 -999.990 1.770 ..P WKT 2010 06 06 19 34 55 31.3200 -97.3300 251.000 457.0 168.577 3.570 -999.990 -999.990 1.686 ..P WKT 2010 06 06 19 39 55 31.3200 -97.3300 251.000 30.0 171.685 3.980 -999.990 -999.990 1.717 ..P WKT 2010 06 06 19 44 55 31.3200 -97.3300 251.000 122.0 171.811 3.700 -999.990 -999.990 1.718 ..P WKT 2010 06 06 19 49 55 31.3200 -97.3300 251.000 457.0 161.716 3.230 -999.990 -999.990 1.617 ..P WKT 2010 06 06 19 59 55 31.3200 -97.3300 251.000 30.0 162.945 2.940 -999.990 -999.990 1.629 ..P WKT 2010 06 06 20 04 55 31.3200 -97.3300 251.000 122.0 164.895 2.810 -999.990 -999.990 1.649 ..P WKT 2010 06 06 20 09 55 31.3200 -97.3300 251.000 457.0 150.394 3.240 -999.990 -999.990 1.504 ..P WKT 2010 06 06 20 14 55 31.3200 -97.3300 251.000 30.0 154.899 4.300 -999.990 -999.990 1.549 ..P WKT 2010 06 06 20 19 55 31.3200 -97.3300 251.000 122.0 165.074 3.200 -999.990 -999.990 1.651 ..P WKT 2010 06 06 20 24 55 31.3200 -97.3300 251.000 457.0 156.817 2.690 -999.990 -999.990 1.568 ..P WKT 2010 06 06 20 34 55 31.3200 -97.3300 251.000 30.0 159.058 3.750 -999.990 -999.990 1.591 ..P WKT 2010 06 06 20 39 55 31.3200 -97.3300 251.000 122.0 167.565 2.940 -999.990 -999.990 1.676 ..P WKT 2010 06 06 20 44 55 31.3200 -97.3300 251.000 457.0 161.338 3.120 -999.990 -999.990 1.613 ..P WKT 2010 06 06 20 49 55 31.3200 -97.3300 251.000 30.0 158.229 2.590 -999.990 -999.990 1.582 ..P WKT 2010 06 06 20 54 55 31.3200 -97.3300 251.000 122.0 165.597 3.000 -999.990 -999.990 1.656 ..P WKT 2010 06 06 20 59 55 31.3200 -97.3300 251.000 457.0 163.904 2.880 -999.990 -999.990 1.639 ..P WKT 2010 06 06 21 09 55 31.3200 -97.3300 251.000 30.0 158.985 2.680 -999.990 -999.990 1.590 ..P WKT 2010 06 06 21 14 55 31.3200 -97.3300 251.000 122.0 160.002 2.850 -999.990 -999.990 1.600 ..P WKT 2010 06 06 21 19 55 31.3200 -97.3300 251.000 457.0 162.998 2.820 -999.990 -999.990 1.630 ..P WKT 2010 06 06 21 24 55 31.3200 -97.3300 251.000 30.0 161.469 3.690 -999.990 -999.990 1.615 ..P WKT 2010 06 06 21 29 55 31.3200 -97.3300 251.000 122.0 161.354 3.430 -999.990 -999.990 1.614 ..P WKT 2010 06 06 21 34 55 31.3200 -97.3300 251.000 457.0 162.652 4.380 -999.990 -999.990 1.627 ..P WKT 2010 06 06 21 44 55 31.3200 -97.3300 251.000 30.0 165.429 5.500 -999.990 -999.990 1.654 ..P WKT 2010 06 06 21 49 55 31.3200 -97.3300 251.000 122.0 169.308 2.880 -999.990 -999.990 1.693 ..P WKT 2010 06 06 21 54 55 31.3200 -97.3300 251.000 457.0 159.065 2.630 -999.990 -999.990 1.591 ..P WKT 2010 06 06 21 59 55 31.3200 -97.3300 251.000 30.0 161.108 2.650 -999.990 -999.990 1.611 ..P WKT 2010 06 06 22 04 55 31.3200 -97.3300 251.000 122.0 169.503 3.440 -999.990 -999.990 1.695 ..P WKT 2010 06 06 22 09 55 31.3200 -97.3300 251.000 457.0 164.064 2.660 -999.990 -999.990 1.641 ..P WKT 2010 06 06 22 19 55 31.3200 -97.3300 251.000 30.0 161.194 2.700 -999.990 -999.990 1.612 ..P WKT 2010 06 06 22 24 55 31.3200 -97.3300 251.000 122.0 171.515 4.010 -999.990 -999.990 1.715 ..P WKT 2010 06 06 22 29 55 31.3200 -97.3300 251.000 457.0 166.323 2.560 -999.990 -999.990 1.663 ..P WKT 2010 06 06 22 34 55 31.3200 -97.3300 251.000 30.0 160.992 2.680 -999.990 -999.990 1.610 ..P WKT 2010 06 06 22 39 55 31.3200 -97.3300 251.000 122.0 176.662 3.020 -999.990 -999.990 1.767 ..P WKT 2010 06 06 22 44 55 31.3200 -97.3300 251.000 457.0 162.453 2.990 -999.990 -999.990 1.625 ..P WKT 2010 06 06 22 54 55 31.3200 -97.3300 251.000 30.0 165.182 2.760 -999.990 -999.990 1.652 ..P WKT 2010 06 06 22 59 55 31.3200 -97.3300 251.000 122.0 173.656 3.140 -999.990 -999.990 1.737 ..P WKT 2010 06 06 23 04 55 31.3200 -97.3300 251.000 457.0 160.445 2.950 -999.990 -999.990 1.604 ..P WKT 2010 06 06 23 09 55 31.3200 -97.3300 251.000 30.0 160.754 2.930 -999.990 -999.990 1.608 ..P WKT 2010 06 06 23 14 55 31.3200 -97.3300 251.000 122.0 172.883 3.890 -999.990 -999.990 1.729 ..P WKT 2010 06 06 23 19 55 31.3200 -97.3300 251.000 457.0 163.058 3.250 -999.990 -999.990 1.631 ..P WKT 2010 06 06 23 29 55 31.3200 -97.3300 251.000 30.0 164.438 3.290 -999.990 -999.990 1.644 ..P WKT 2010 06 06 23 34 55 31.3200 -97.3300 251.000 122.0 175.776 2.870 -999.990 -999.990 1.758 ..P WKT 2010 06 06 23 39 55 31.3200 -97.3300 251.000 457.0 166.864 2.860 -999.990 -999.990 1.669 ..P WKT 2010 06 06 23 44 55 31.3200 -97.3300 251.000 30.0 169.061 3.610 -999.990 -999.990 1.691 ..P WKT 2010 06 06 23 49 55 31.3200 -97.3300 251.000 122.0 171.818 3.900 -999.990 -999.990 1.718 ..P WKT 2010 06 07 00 09 55 31.3200 -97.3300 251.000 457.0 164.651 3.630 -999.990 -999.990 1.647 ..P WKT 2010 06 07 00 10 25 31.3200 -97.3300 251.000 457.0 166.814 3.410 -999.990 -999.990 1.668 ..P WKT 2010 06 07 00 10 55 31.3200 -97.3300 251.000 457.0 172.911 3.490 -999.990 -999.990 1.729 ..P WKT 2010 06 07 00 11 25 31.3200 -97.3300 251.000 457.0 170.299 3.850 -999.990 -999.990 1.703 ..P WKT 2010 06 07 00 11 55 31.3200 -97.3300 251.000 457.0 168.811 3.480 -999.990 -999.990 1.688 ..P WKT 2010 06 07 00 12 25 31.3200 -97.3300 251.000 457.0 169.290 3.350 -999.990 -999.990 1.693 ..P WKT 2010 06 07 00 12 55 31.3200 -97.3300 251.000 457.0 168.082 3.320 -999.990 -999.990 1.681 ..P WKT 2010 06 07 00 13 25 31.3200 -97.3300 251.000 457.0 172.774 3.710 -999.990 -999.990 1.728 ..P WKT 2010 06 07 00 13 55 31.3200 -97.3300 251.000 457.0 169.320 4.040 -999.990 -999.990 1.693 ..P WKT 2010 06 07 00 14 25 31.3200 -97.3300 251.000 457.0 169.798 3.550 -999.990 -999.990 1.698 ..P WKT 2010 06 07 00 14 55 31.3200 -97.3300 251.000 457.0 168.030 3.460 -999.990 -999.990 1.680 ..P WKT 2010 06 07 00 19 55 31.3200 -97.3300 251.000 30.0 165.510 3.620 -999.990 -999.990 1.655 ..P WKT 2010 06 07 00 24 55 31.3200 -97.3300 251.000 122.0 172.538 4.170 -999.990 -999.990 1.725 ..P WKT 2010 06 07 00 29 55 31.3200 -97.3300 251.000 457.0 173.107 3.910 -999.990 -999.990 1.731 ..P WKT 2010 06 07 00 34 55 31.3200 -97.3300 251.000 30.0 171.991 4.670 -999.990 -999.990 1.720 ..P WKT 2010 06 07 00 39 55 31.3200 -97.3300 251.000 122.0 177.894 3.840 -999.990 -999.990 1.779 ..P WKT 2010 06 07 00 44 55 31.3200 -97.3300 251.000 457.0 168.637 3.230 -999.990 -999.990 1.686 ..P WKT 2010 06 07 00 54 55 31.3200 -97.3300 251.000 30.0 172.591 2.650 -999.990 -999.990 1.726 ..P WKT 2010 06 07 00 59 55 31.3200 -97.3300 251.000 122.0 171.204 4.060 -999.990 -999.990 1.712 ..P WKT 2010 06 07 01 04 55 31.3200 -97.3300 251.000 457.0 160.557 4.040 -999.990 -999.990 1.606 ..P WKT 2010 06 07 01 09 55 31.3200 -97.3300 251.000 30.0 163.379 3.190 -999.990 -999.990 1.634 ..P WKT 2010 06 07 01 14 55 31.3200 -97.3300 251.000 122.0 176.584 3.510 -999.990 -999.990 1.766 ..P WKT 2010 06 07 01 19 55 31.3200 -97.3300 251.000 457.0 172.111 3.650 -999.990 -999.990 1.721 ..P WKT 2010 06 07 01 29 55 31.3200 -97.3300 251.000 30.0 185.909 4.150 -999.990 -999.990 1.859 ..P WKT 2010 06 07 01 34 55 31.3200 -97.3300 251.000 122.0 181.736 4.310 -999.990 -999.990 1.817 ..P WKT 2010 06 07 01 39 55 31.3200 -97.3300 251.000 457.0 178.266 4.180 -999.990 -999.990 1.783 ..P WKT 2010 06 07 01 44 55 31.3200 -97.3300 251.000 30.0 197.231 5.390 -999.990 -999.990 1.972 ..P WKT 2010 06 07 01 49 55 31.3200 -97.3300 251.000 122.0 172.729 4.990 -999.990 -999.990 1.727 ..P WKT 2010 06 07 01 54 55 31.3200 -97.3300 251.000 457.0 170.943 4.160 -999.990 -999.990 1.709 ..P WKT 2010 06 07 02 04 55 31.3200 -97.3300 251.000 30.0 184.232 4.090 -999.990 -999.990 1.842 ..P WKT 2010 06 07 02 09 55 31.3200 -97.3300 251.000 122.0 181.504 5.190 -999.990 -999.990 1.815 ..P WKT 2010 06 07 02 14 55 31.3200 -97.3300 251.000 457.0 174.431 5.330 -999.990 -999.990 1.744 ..P WKT 2010 06 07 02 19 55 31.3200 -97.3300 251.000 30.0 185.017 5.100 -999.990 -999.990 1.850 ..P WKT 2010 06 07 02 24 55 31.3200 -97.3300 251.000 122.0 183.551 4.060 -999.990 -999.990 1.836 ..P WKT 2010 06 07 02 29 55 31.3200 -97.3300 251.000 457.0 172.978 5.060 -999.990 -999.990 1.730 ..P WKT 2010 06 07 02 39 55 31.3200 -97.3300 251.000 30.0 180.235 4.470 -999.990 -999.990 1.802 ..P WKT 2010 06 07 02 44 55 31.3200 -97.3300 251.000 122.0 183.212 4.660 -999.990 -999.990 1.832 ..P WKT 2010 06 07 02 49 55 31.3200 -97.3300 251.000 457.0 171.622 4.200 -999.990 -999.990 1.716 ..P WKT 2010 06 07 02 54 55 31.3200 -97.3300 251.000 30.0 176.140 5.630 -999.990 -999.990 1.761 ..P WKT 2010 06 07 02 59 55 31.3200 -97.3300 251.000 122.0 181.078 3.740 -999.990 -999.990 1.811 ..P WKT 2010 06 07 03 04 55 31.3200 -97.3300 251.000 457.0 179.572 3.350 -999.990 -999.990 1.796 ..P WKT 2010 06 07 03 14 55 31.3200 -97.3300 251.000 30.0 183.064 3.110 -999.990 -999.990 1.831 ..P WKT 2010 06 07 03 19 55 31.3200 -97.3300 251.000 122.0 181.759 3.930 -999.990 -999.990 1.818 ..P WKT 2010 06 07 03 24 55 31.3200 -97.3300 251.000 457.0 182.975 3.270 -999.990 -999.990 1.830 ..P WKT 2010 06 07 03 29 55 31.3200 -97.3300 251.000 30.0 181.810 3.360 -999.990 -999.990 1.818 ..P WKT 2010 06 07 03 34 55 31.3200 -97.3300 251.000 122.0 185.125 3.330 -999.990 -999.990 1.851 ..P WKT 2010 06 07 03 39 55 31.3200 -97.3300 251.000 457.0 182.421 4.190 -999.990 -999.990 1.824 ..P WKT 2010 06 07 03 49 55 31.3200 -97.3300 251.000 30.0 178.434 3.970 -999.990 -999.990 1.784 ..P WKT 2010 06 07 03 54 55 31.3200 -97.3300 251.000 122.0 182.887 3.890 -999.990 -999.990 1.829 ..P WKT 2010 06 07 03 59 55 31.3200 -97.3300 251.000 457.0 176.427 3.440 -999.990 -999.990 1.764 ..P WKT 2010 06 07 04 04 55 31.3200 -97.3300 251.000 30.0 180.319 3.910 -999.990 -999.990 1.803 ..P WKT 2010 06 07 04 09 55 31.3200 -97.3300 251.000 122.0 181.414 3.280 -999.990 -999.990 1.814 ..P WKT 2010 06 07 04 14 55 31.3200 -97.3300 251.000 457.0 181.389 3.350 -999.990 -999.990 1.814 ..P WKT 2010 06 07 04 24 55 31.3200 -97.3300 251.000 30.0 175.986 3.300 -999.990 -999.990 1.760 ..P WKT 2010 06 07 04 29 55 31.3200 -97.3300 251.000 122.0 187.388 4.050 -999.990 -999.990 1.874 ..P WKT 2010 06 07 04 34 55 31.3200 -97.3300 251.000 457.0 185.925 4.160 -999.990 -999.990 1.859 ..P WKT 2010 06 07 04 39 55 31.3200 -97.3300 251.000 30.0 180.548 5.330 -999.990 -999.990 1.805 ..P WKT 2010 06 07 04 44 55 31.3200 -97.3300 251.000 122.0 189.429 4.100 -999.990 -999.990 1.894 ..P WKT 2010 06 07 04 49 55 31.3200 -97.3300 251.000 457.0 184.053 4.290 -999.990 -999.990 1.841 ..P WKT 2010 06 07 05 04 55 31.3200 -97.3300 251.000 30.0 177.755 4.550 -999.990 -999.990 1.778 ..P WKT 2010 06 07 05 09 55 31.3200 -97.3300 251.000 122.0 187.075 5.900 -999.990 -999.990 1.871 ..P WKT 2010 06 07 05 14 55 31.3200 -97.3300 251.000 457.0 181.025 4.590 -999.990 -999.990 1.810 ..P WKT 2010 06 07 05 19 55 31.3200 -97.3300 251.000 30.0 179.447 4.110 -999.990 -999.990 1.794 ..P WKT 2010 06 07 05 24 55 31.3200 -97.3300 251.000 122.0 184.573 4.650 -999.990 -999.990 1.846 ..P WKT 2010 06 07 05 29 55 31.3200 -97.3300 251.000 457.0 180.480 3.600 -999.990 -999.990 1.805 ..P WKT 2010 06 07 05 39 55 31.3200 -97.3300 251.000 30.0 180.952 3.380 -999.990 -999.990 1.810 ..P WKT 2010 06 07 05 44 55 31.3200 -97.3300 251.000 122.0 188.589 4.780 -999.990 -999.990 1.886 ..P WKT 2010 06 07 05 49 55 31.3200 -97.3300 251.000 457.0 190.638 4.820 -999.990 -999.990 1.906 ..P WKT 2010 06 07 05 54 55 31.3200 -97.3300 251.000 30.0 177.468 4.170 -999.990 -999.990 1.775 ..P WKT 2010 06 07 05 59 55 31.3200 -97.3300 251.000 122.0 183.846 3.840 -999.990 -999.990 1.838 ..P WKT 2010 06 07 06 04 55 31.3200 -97.3300 251.000 457.0 194.411 3.470 -999.990 -999.990 1.944 ..P WKT 2010 06 07 06 14 55 31.3200 -97.3300 251.000 30.0 189.036 3.220 -999.990 -999.990 1.890 ..P WKT 2010 06 07 06 19 55 31.3200 -97.3300 251.000 122.0 193.895 3.390 -999.990 -999.990 1.939 ..P WKT 2010 06 07 06 24 55 31.3200 -97.3300 251.000 457.0 153.260 3.440 -999.990 -999.990 1.533 ..P WKT 2010 06 07 06 29 55 31.3200 -97.3300 251.000 30.0 184.495 4.000 -999.990 -999.990 1.845 ..P WKT 2010 06 07 06 34 55 31.3200 -97.3300 251.000 122.0 175.959 3.290 -999.990 -999.990 1.760 ..P WKT 2010 06 07 06 39 55 31.3200 -97.3300 251.000 457.0 131.288 3.230 -999.990 -999.990 1.313 ..P WKT 2010 06 07 06 49 55 31.3200 -97.3300 251.000 30.0 182.324 5.270 -999.990 -999.990 1.823 ..P WKT 2010 06 07 06 54 55 31.3200 -97.3300 251.000 122.0 154.561 3.690 -999.990 -999.990 1.546 ..P WKT 2010 06 07 06 59 55 31.3200 -97.3300 251.000 457.0 136.846 3.370 -999.990 -999.990 1.368 ..P WKT 2010 06 07 07 04 55 31.3200 -97.3300 251.000 30.0 163.343 3.700 -999.990 -999.990 1.633 ..P WKT 2010 06 07 07 09 55 31.3200 -97.3300 251.000 122.0 141.585 3.310 -999.990 -999.990 1.416 ..P WKT 2010 06 07 07 14 55 31.3200 -97.3300 251.000 457.0 123.876 3.640 -999.990 -999.990 1.239 ..P WKT 2010 06 07 07 24 55 31.3200 -97.3300 251.000 30.0 144.848 3.650 -999.990 -999.990 1.448 ..P WKT 2010 06 07 07 29 55 31.3200 -97.3300 251.000 122.0 148.113 4.650 -999.990 -999.990 1.481 ..P WKT 2010 06 07 07 34 55 31.3200 -97.3300 251.000 457.0 119.317 4.140 -999.990 -999.990 1.193 ..P WKT 2010 06 07 07 39 55 31.3200 -97.3300 251.000 30.0 142.514 4.380 -999.990 -999.990 1.425 ..P WKT 2010 06 07 07 44 55 31.3200 -97.3300 251.000 122.0 139.785 5.380 -999.990 -999.990 1.398 ..P WKT 2010 06 07 07 49 55 31.3200 -97.3300 251.000 457.0 129.811 4.380 -999.990 -999.990 1.298 ..P WKT 2010 06 07 07 59 55 31.3200 -97.3300 251.000 30.0 142.788 3.510 -999.990 -999.990 1.428 ..P WKT 2010 06 07 08 04 55 31.3200 -97.3300 251.000 122.0 138.706 3.600 -999.990 -999.990 1.387 ..P WKT 2010 06 07 08 09 55 31.3200 -97.3300 251.000 457.0 122.367 3.950 -999.990 -999.990 1.224 ..P WKT 2010 06 07 08 14 55 31.3200 -97.3300 251.000 30.0 143.082 3.540 -999.990 -999.990 1.431 ..P WKT 2010 06 07 08 19 55 31.3200 -97.3300 251.000 122.0 136.495 3.290 -999.990 -999.990 1.365 ..P WKT 2010 06 07 08 24 55 31.3200 -97.3300 251.000 457.0 119.881 3.460 -999.990 -999.990 1.199 ..P WKT 2010 06 07 08 34 55 31.3200 -97.3300 251.000 30.0 137.069 3.350 -999.990 -999.990 1.371 ..P WKT 2010 06 07 08 39 55 31.3200 -97.3300 251.000 122.0 132.434 3.970 -999.990 -999.990 1.324 ..P WKT 2010 06 07 08 44 55 31.3200 -97.3300 251.000 457.0 113.042 3.340 -999.990 -999.990 1.130 ..P WKT 2010 06 07 08 49 55 31.3200 -97.3300 251.000 30.0 136.809 3.900 -999.990 -999.990 1.368 ..P WKT 2010 06 07 08 54 55 31.3200 -97.3300 251.000 122.0 137.186 4.090 -999.990 -999.990 1.372 ..P WKT 2010 06 07 08 59 55 31.3200 -97.3300 251.000 457.0 115.570 3.400 -999.990 -999.990 1.156 ..P WKT 2010 06 07 09 09 55 31.3200 -97.3300 251.000 30.0 124.439 3.480 -999.990 -999.990 1.244 ..P WKT 2010 06 07 09 14 55 31.3200 -97.3300 251.000 122.0 128.753 4.320 -999.990 -999.990 1.288 ..P WKT 2010 06 07 09 19 55 31.3200 -97.3300 251.000 457.0 114.979 3.550 -999.990 -999.990 1.150 ..P WKT 2010 06 07 09 24 55 31.3200 -97.3300 251.000 30.0 133.762 3.950 -999.990 -999.990 1.338 ..P WKT 2010 06 07 09 29 55 31.3200 -97.3300 251.000 122.0 129.727 4.550 -999.990 -999.990 1.297 ..P WKT 2010 06 07 09 34 55 31.3200 -97.3300 251.000 457.0 102.740 3.560 -999.990 -999.990 1.027 ..P WKT 2010 06 07 09 44 55 31.3200 -97.3300 251.000 30.0 124.700 5.980 -999.990 -999.990 1.247 ..P WKT 2010 06 07 09 49 55 31.3200 -97.3300 251.000 122.0 128.435 4.200 -999.990 -999.990 1.284 ..P WKT 2010 06 07 09 54 55 31.3200 -97.3300 251.000 457.0 114.092 4.030 -999.990 -999.990 1.141 ..P WKT 2010 06 07 09 59 55 31.3200 -97.3300 251.000 30.0 125.614 4.670 -999.990 -999.990 1.256 ..P WKT 2010 06 07 10 04 55 31.3200 -97.3300 251.000 122.0 123.648 4.000 -999.990 -999.990 1.236 ..P WKT 2010 06 07 10 09 55 31.3200 -97.3300 251.000 457.0 112.785 3.930 -999.990 -999.990 1.128 ..P WKT 2010 06 07 10 19 55 31.3200 -97.3300 251.000 30.0 129.407 4.640 -999.990 -999.990 1.294 ..P WKT 2010 06 07 10 24 55 31.3200 -97.3300 251.000 122.0 130.063 4.210 -999.990 -999.990 1.301 ..P WKT 2010 06 07 10 29 55 31.3200 -97.3300 251.000 457.0 107.370 4.220 -999.990 -999.990 1.074 ..P WKT 2010 06 07 10 34 55 31.3200 -97.3300 251.000 30.0 124.285 4.040 -999.990 -999.990 1.243 ..P WKT 2010 06 07 10 39 55 31.3200 -97.3300 251.000 122.0 136.752 5.400 -999.990 -999.990 1.368 ..P WKT 2010 06 07 10 44 55 31.3200 -97.3300 251.000 457.0 107.394 3.890 -999.990 -999.990 1.074 ..P WKT 2010 06 07 10 54 55 31.3200 -97.3300 251.000 30.0 134.150 3.880 -999.990 -999.990 1.342 ..P WKT 2010 06 07 10 59 55 31.3200 -97.3300 251.000 122.0 130.517 4.250 -999.990 -999.990 1.305 ..P WKT 2010 06 07 11 04 55 31.3200 -97.3300 251.000 457.0 101.329 4.340 -999.990 -999.990 1.013 ..P WKT 2010 06 07 11 09 55 31.3200 -97.3300 251.000 30.0 132.978 4.260 -999.990 -999.990 1.330 ..P WKT 2010 06 07 11 14 55 31.3200 -97.3300 251.000 122.0 136.568 5.720 -999.990 -999.990 1.366 ..P WKT 2010 06 07 11 19 55 31.3200 -97.3300 251.000 457.0 110.580 4.750 -999.990 -999.990 1.106 ..P WKT 2010 06 07 11 29 55 31.3200 -97.3300 251.000 30.0 141.903 4.650 -999.990 -999.990 1.419 ..P WKT 2010 06 07 11 34 55 31.3200 -97.3300 251.000 122.0 137.700 4.400 -999.990 -999.990 1.377 ..P WKT 2010 06 07 11 39 55 31.3200 -97.3300 251.000 457.0 112.953 4.830 -999.990 -999.990 1.130 ..P WKT 2010 06 07 11 44 55 31.3200 -97.3300 251.000 30.0 137.069 3.800 -999.990 -999.990 1.371 ..P WKT 2010 06 07 11 49 55 31.3200 -97.3300 251.000 122.0 134.255 3.920 -999.990 -999.990 1.343 ..P WKT 2010 06 07 12 09 55 31.3200 -97.3300 251.000 457.0 115.944 3.250 -999.990 -999.990 1.159 ..P WKT 2010 06 07 12 10 25 31.3200 -97.3300 251.000 457.0 114.204 3.120 -999.990 -999.990 1.142 ..P WKT 2010 06 07 12 10 55 31.3200 -97.3300 251.000 457.0 117.183 3.610 -999.990 -999.990 1.172 ..P WKT 2010 06 07 12 11 25 31.3200 -97.3300 251.000 457.0 119.052 3.330 -999.990 -999.990 1.191 ..P WKT 2010 06 07 12 11 55 31.3200 -97.3300 251.000 457.0 112.872 3.510 -999.990 -999.990 1.129 ..P WKT 2010 06 07 12 12 25 31.3200 -97.3300 251.000 457.0 113.353 3.350 -999.990 -999.990 1.134 ..P WKT 2010 06 07 12 12 55 31.3200 -97.3300 251.000 457.0 114.944 3.520 -999.990 -999.990 1.149 ..P WKT 2010 06 07 12 13 25 31.3200 -97.3300 251.000 457.0 111.817 3.300 -999.990 -999.990 1.118 ..P WKT 2010 06 07 12 13 55 31.3200 -97.3300 251.000 457.0 117.294 4.170 -999.990 -999.990 1.173 ..P WKT 2010 06 07 12 14 25 31.3200 -97.3300 251.000 457.0 119.718 3.330 -999.990 -999.990 1.197 ..P WKT 2010 06 07 12 14 55 31.3200 -97.3300 251.000 457.0 117.146 3.800 -999.990 -999.990 1.171 ..P WKT 2010 06 07 12 19 55 31.3200 -97.3300 251.000 30.0 140.272 4.750 -999.990 -999.990 1.403 ..P WKT 2010 06 07 12 24 55 31.3200 -97.3300 251.000 122.0 143.972 3.970 -999.990 -999.990 1.440 ..P WKT 2010 06 07 12 29 55 31.3200 -97.3300 251.000 457.0 112.701 5.010 -999.990 -999.990 1.127 ..P WKT 2010 06 07 12 34 55 31.3200 -97.3300 251.000 30.0 139.159 3.240 -999.990 -999.990 1.392 ..P WKT 2010 06 07 12 39 55 31.3200 -97.3300 251.000 122.0 149.519 3.530 -999.990 -999.990 1.495 ..P WKT 2010 06 07 12 44 55 31.3200 -97.3300 251.000 457.0 115.195 3.220 -999.990 -999.990 1.152 ..P WKT 2010 06 07 12 54 55 31.3200 -97.3300 251.000 30.0 137.885 3.330 -999.990 -999.990 1.379 ..P WKT 2010 06 07 12 59 55 31.3200 -97.3300 251.000 122.0 140.779 3.110 -999.990 -999.990 1.408 ..P WKT 2010 06 07 13 04 55 31.3200 -97.3300 251.000 457.0 118.692 3.860 -999.990 -999.990 1.187 ..P WKT 2010 06 07 13 09 55 31.3200 -97.3300 251.000 30.0 140.182 4.400 -999.990 -999.990 1.402 ..P WKT 2010 06 07 13 14 55 31.3200 -97.3300 251.000 122.0 126.699 4.300 -999.990 -999.990 1.267 ..P WKT 2010 06 07 13 19 55 31.3200 -97.3300 251.000 457.0 122.098 3.680 -999.990 -999.990 1.221 ..P WKT 2010 06 07 13 29 55 31.3200 -97.3300 251.000 30.0 129.273 3.440 -999.990 -999.990 1.293 ..P WKT 2010 06 07 13 34 55 31.3200 -97.3300 251.000 122.0 134.803 4.120 -999.990 -999.990 1.348 ..P WKT 2010 06 07 13 39 55 31.3200 -97.3300 251.000 457.0 129.092 4.580 -999.990 -999.990 1.291 ..P WKT 2010 06 07 13 44 55 31.3200 -97.3300 251.000 30.0 132.402 5.670 -999.990 -999.990 1.324 ..P WKT 2010 06 07 13 49 55 31.3200 -97.3300 251.000 122.0 138.766 5.620 -999.990 -999.990 1.388 ..P WKT 2010 06 07 13 54 55 31.3200 -97.3300 251.000 457.0 124.866 4.960 -999.990 -999.990 1.249 ..P WKT 2010 06 07 14 04 55 31.3200 -97.3300 251.000 30.0 130.792 3.960 -999.990 -999.990 1.308 ..P WKT 2010 06 07 14 09 55 31.3200 -97.3300 251.000 122.0 139.238 5.330 -999.990 -999.990 1.392 ..P WKT 2010 06 07 14 14 55 31.3200 -97.3300 251.000 457.0 116.315 5.420 -999.990 -999.990 1.163 ..P WKT 2010 06 07 14 19 55 31.3200 -97.3300 251.000 30.0 127.259 4.320 -999.990 -999.990 1.273 ..P WKT 2010 06 07 14 24 55 31.3200 -97.3300 251.000 122.0 134.872 3.770 -999.990 -999.990 1.349 ..P WKT 2010 06 07 14 29 55 31.3200 -97.3300 251.000 457.0 115.835 3.590 -999.990 -999.990 1.158 ..P WKT 2010 06 07 14 39 55 31.3200 -97.3300 251.000 30.0 125.648 3.880 -999.990 -999.990 1.256 ..P WKT 2010 06 07 14 44 55 31.3200 -97.3300 251.000 122.0 131.734 5.730 -999.990 -999.990 1.317 ..P WKT 2010 06 07 14 49 55 31.3200 -97.3300 251.000 457.0 126.300 5.650 -999.990 -999.990 1.263 ..P WKT 2010 06 07 14 54 55 31.3200 -97.3300 251.000 30.0 130.998 4.390 -999.990 -999.990 1.310 ..P WKT 2010 06 07 14 59 55 31.3200 -97.3300 251.000 122.0 130.283 4.680 -999.990 -999.990 1.303 ..P WKT 2010 06 07 15 04 55 31.3200 -97.3300 251.000 457.0 127.347 4.840 -999.990 -999.990 1.273 ..P WKT 2010 06 07 15 14 55 31.3200 -97.3300 251.000 30.0 127.820 4.840 -999.990 -999.990 1.278 ..P WKT 2010 06 07 15 19 55 31.3200 -97.3300 251.000 122.0 126.095 4.440 -999.990 -999.990 1.261 ..P WKT 2010 06 07 15 24 55 31.3200 -97.3300 251.000 457.0 127.422 4.170 -999.990 -999.990 1.274 ..P WKT 2010 06 07 15 29 55 31.3200 -97.3300 251.000 30.0 127.778 4.550 -999.990 -999.990 1.278 ..P WKT 2010 06 07 15 34 55 31.3200 -97.3300 251.000 122.0 129.521 3.720 -999.990 -999.990 1.295 ..P WKT 2010 06 07 15 39 55 31.3200 -97.3300 251.000 457.0 121.271 3.410 -999.990 -999.990 1.213 ..P WKT 2010 06 07 15 49 55 31.3200 -97.3300 251.000 30.0 123.490 3.480 -999.990 -999.990 1.235 ..P WKT 2010 06 07 15 54 55 31.3200 -97.3300 251.000 122.0 133.959 4.610 -999.990 -999.990 1.340 ..P WKT 2010 06 07 15 59 55 31.3200 -97.3300 251.000 457.0 123.606 3.750 -999.990 -999.990 1.236 ..P WKT 2010 06 07 16 04 55 31.3200 -97.3300 251.000 30.0 127.967 3.240 -999.990 -999.990 1.280 ..P WKT 2010 06 07 16 09 55 31.3200 -97.3300 251.000 122.0 141.491 3.520 -999.990 -999.990 1.415 ..P WKT 2010 06 07 16 14 55 31.3200 -97.3300 251.000 457.0 128.084 4.390 -999.990 -999.990 1.281 ..P WKT 2010 06 07 16 24 55 31.3200 -97.3300 251.000 30.0 122.330 3.000 -999.990 -999.990 1.223 ..P WKT 2010 06 07 16 29 55 31.3200 -97.3300 251.000 122.0 125.820 3.640 -999.990 -999.990 1.258 ..P WKT 2010 06 07 16 34 55 31.3200 -97.3300 251.000 457.0 118.758 3.330 -999.990 -999.990 1.188 ..P WKT 2010 06 07 16 39 55 31.3200 -97.3300 251.000 30.0 129.189 3.980 -999.990 -999.990 1.292 ..P WKT 2010 06 07 16 44 55 31.3200 -97.3300 251.000 122.0 137.676 3.570 -999.990 -999.990 1.377 ..P WKT 2010 06 07 16 49 55 31.3200 -97.3300 251.000 457.0 126.450 4.000 -999.990 -999.990 1.264 ..P WKT 2010 06 07 17 04 55 31.3200 -97.3300 251.000 30.0 134.831 4.550 -999.990 -999.990 1.348 ..P WKT 2010 06 07 17 09 55 31.3200 -97.3300 251.000 122.0 137.971 3.700 -999.990 -999.990 1.380 ..P WKT 2010 06 07 17 14 55 31.3200 -97.3300 251.000 457.0 130.837 3.740 -999.990 -999.990 1.308 ..P WKT 2010 06 07 17 19 55 31.3200 -97.3300 251.000 30.0 128.979 3.830 -999.990 -999.990 1.290 ..P WKT 2010 06 07 17 24 55 31.3200 -97.3300 251.000 122.0 135.590 3.790 -999.990 -999.990 1.356 ..P WKT 2010 06 07 17 29 55 31.3200 -97.3300 251.000 457.0 132.343 4.800 -999.990 -999.990 1.323 ..P WKT 2010 06 07 17 39 55 31.3200 -97.3300 251.000 30.0 126.894 3.610 -999.990 -999.990 1.269 ..P WKT 2010 06 07 17 44 55 31.3200 -97.3300 251.000 122.0 131.356 4.120 -999.990 -999.990 1.314 ..P WKT 2010 06 07 17 49 55 31.3200 -97.3300 251.000 457.0 123.877 3.800 -999.990 -999.990 1.239 ..P WKT 2010 06 07 17 54 55 31.3200 -97.3300 251.000 30.0 124.590 4.470 -999.990 -999.990 1.246 ..P WKT 2010 06 07 17 59 55 31.3200 -97.3300 251.000 122.0 133.078 4.240 -999.990 -999.990 1.331 ..P WKT 2010 06 07 18 04 55 31.3200 -97.3300 251.000 457.0 125.182 3.620 -999.990 -999.990 1.252 ..P WKT 2010 06 07 18 14 55 31.3200 -97.3300 251.000 30.0 125.398 4.910 -999.990 -999.990 1.254 ..P WKT 2010 06 07 18 19 55 31.3200 -97.3300 251.000 122.0 119.486 3.870 -999.990 -999.990 1.195 ..P WKT 2010 06 07 18 24 55 31.3200 -97.3300 251.000 457.0 117.739 4.560 -999.990 -999.990 1.177 ..P WKT 2010 06 07 18 29 55 31.3200 -97.3300 251.000 30.0 121.824 4.280 -999.990 -999.990 1.218 ..P WKT 2010 06 07 18 34 55 31.3200 -97.3300 251.000 122.0 124.103 3.900 -999.990 -999.990 1.241 ..P WKT 2010 06 07 18 39 55 31.3200 -97.3300 251.000 457.0 127.217 3.460 -999.990 -999.990 1.272 ..P WKT 2010 06 07 18 49 55 31.3200 -97.3300 251.000 30.0 116.146 3.610 -999.990 -999.990 1.161 ..P WKT 2010 06 07 18 54 55 31.3200 -97.3300 251.000 122.0 125.289 3.640 -999.990 -999.990 1.253 ..P WKT 2010 06 07 18 59 55 31.3200 -97.3300 251.000 457.0 121.796 4.600 -999.990 -999.990 1.218 ..P WKT 2010 06 07 19 04 55 31.3200 -97.3300 251.000 30.0 114.833 3.750 -999.990 -999.990 1.148 ..P WKT 2010 06 07 19 09 55 31.3200 -97.3300 251.000 122.0 128.142 4.490 -999.990 -999.990 1.281 ..P WKT 2010 06 07 19 14 55 31.3200 -97.3300 251.000 457.0 115.901 3.720 -999.990 -999.990 1.159 ..P WKT 2010 06 07 19 24 55 31.3200 -97.3300 251.000 30.0 119.906 4.030 -999.990 -999.990 1.199 ..P WKT 2010 06 07 19 29 55 31.3200 -97.3300 251.000 122.0 123.793 4.020 -999.990 -999.990 1.238 ..P WKT 2010 06 07 19 34 55 31.3200 -97.3300 251.000 457.0 124.625 3.920 -999.990 -999.990 1.246 ..P WKT 2010 06 07 19 39 55 31.3200 -97.3300 251.000 30.0 121.013 3.760 -999.990 -999.990 1.210 ..P WKT 2010 06 07 19 44 55 31.3200 -97.3300 251.000 122.0 123.234 4.360 -999.990 -999.990 1.232 ..P WKT 2010 06 07 19 49 55 31.3200 -97.3300 251.000 457.0 116.290 3.890 -999.990 -999.990 1.163 ..P WKT 2010 06 07 19 59 55 31.3200 -97.3300 251.000 30.0 119.659 4.130 -999.990 -999.990 1.197 ..P WKT 2010 06 07 20 04 55 31.3200 -97.3300 251.000 122.0 121.642 4.150 -999.990 -999.990 1.216 ..P WKT 2010 06 07 20 09 55 31.3200 -97.3300 251.000 457.0 110.849 4.760 -999.990 -999.990 1.108 ..P WKT 2010 06 07 20 14 55 31.3200 -97.3300 251.000 30.0 115.054 4.490 -999.990 -999.990 1.151 ..P WKT 2010 06 07 20 19 55 31.3200 -97.3300 251.000 122.0 121.758 4.740 -999.990 -999.990 1.218 ..P WKT 2010 06 07 20 24 55 31.3200 -97.3300 251.000 457.0 111.519 5.210 -999.990 -999.990 1.115 ..P WKT 2010 06 07 20 34 55 31.3200 -97.3300 251.000 30.0 116.873 4.810 -999.990 -999.990 1.169 ..P WKT 2010 06 07 20 39 55 31.3200 -97.3300 251.000 122.0 121.911 5.040 -999.990 -999.990 1.219 ..P WKT 2010 06 07 20 44 55 31.3200 -97.3300 251.000 457.0 121.117 4.110 -999.990 -999.990 1.211 ..P WKT 2010 06 07 20 49 55 31.3200 -97.3300 251.000 30.0 120.044 3.920 -999.990 -999.990 1.200 ..P WKT 2010 06 07 20 54 55 31.3200 -97.3300 251.000 122.0 116.194 3.950 -999.990 -999.990 1.162 ..P WKT 2010 06 07 20 59 55 31.3200 -97.3300 251.000 457.0 119.566 4.330 -999.990 -999.990 1.196 ..P WKT 2010 06 07 21 09 55 31.3200 -97.3300 251.000 30.0 128.035 3.280 -999.990 -999.990 1.280 ..P WKT 2010 06 07 21 14 55 31.3200 -97.3300 251.000 122.0 122.577 3.680 -999.990 -999.990 1.226 ..P WKT 2010 06 07 21 19 55 31.3200 -97.3300 251.000 457.0 120.453 3.850 -999.990 -999.990 1.205 ..P WKT 2010 06 07 21 24 55 31.3200 -97.3300 251.000 30.0 125.551 3.850 -999.990 -999.990 1.256 ..P WKT 2010 06 07 21 29 55 31.3200 -97.3300 251.000 122.0 131.343 3.770 -999.990 -999.990 1.313 ..P WKT 2010 06 07 21 34 55 31.3200 -97.3300 251.000 457.0 132.274 3.960 -999.990 -999.990 1.323 ..P WKT 2010 06 07 21 44 55 31.3200 -97.3300 251.000 30.0 134.177 4.000 -999.990 -999.990 1.342 ..P WKT 2010 06 07 21 49 55 31.3200 -97.3300 251.000 122.0 143.342 3.660 -999.990 -999.990 1.433 ..P WKT 2010 06 07 21 54 55 31.3200 -97.3300 251.000 457.0 134.314 4.760 -999.990 -999.990 1.343 ..P WKT 2010 06 07 21 59 55 31.3200 -97.3300 251.000 30.0 137.646 4.760 -999.990 -999.990 1.376 ..P WKT 2010 06 07 22 04 55 31.3200 -97.3300 251.000 122.0 139.728 3.900 -999.990 -999.990 1.397 ..P WKT 2010 06 07 22 09 55 31.3200 -97.3300 251.000 457.0 140.561 4.150 -999.990 -999.990 1.406 ..P WKT 2010 06 07 22 19 55 31.3200 -97.3300 251.000 30.0 147.225 4.610 -999.990 -999.990 1.472 ..P WKT 2010 06 07 22 24 55 31.3200 -97.3300 251.000 122.0 151.946 4.050 -999.990 -999.990 1.519 ..P WKT 2010 06 07 22 29 55 31.3200 -97.3300 251.000 457.0 150.973 5.060 -999.990 -999.990 1.510 ..P WKT 2010 06 07 22 34 55 31.3200 -97.3300 251.000 30.0 150.139 4.240 -999.990 -999.990 1.501 ..P WKT 2010 06 07 22 39 55 31.3200 -97.3300 251.000 122.0 162.083 4.650 -999.990 -999.990 1.621 ..P WKT 2010 06 07 22 44 55 31.3200 -97.3300 251.000 457.0 151.803 3.710 -999.990 -999.990 1.518 ..P WKT 2010 06 07 22 54 55 31.3200 -97.3300 251.000 30.0 150.968 3.430 -999.990 -999.990 1.510 ..P WKT 2010 06 07 22 59 55 31.3200 -97.3300 251.000 122.0 154.856 3.460 -999.990 -999.990 1.549 ..P WKT 2010 06 07 23 04 55 31.3200 -97.3300 251.000 457.0 152.077 4.120 -999.990 -999.990 1.521 ..P WKT 2010 06 07 23 09 55 31.3200 -97.3300 251.000 30.0 154.298 3.810 -999.990 -999.990 1.543 ..P WKT 2010 06 07 23 14 55 31.3200 -97.3300 251.000 122.0 154.020 3.830 -999.990 -999.990 1.540 ..P WKT 2010 06 07 23 19 55 31.3200 -97.3300 251.000 457.0 156.242 3.910 -999.990 -999.990 1.562 ..P WKT 2010 06 07 23 29 55 31.3200 -97.3300 251.000 30.0 156.448 4.400 -999.990 -999.990 1.564 ..P WKT 2010 06 07 23 34 55 31.3200 -97.3300 251.000 122.0 162.489 3.900 -999.990 -999.990 1.625 ..P WKT 2010 06 07 23 39 55 31.3200 -97.3300 251.000 457.0 153.529 3.650 -999.990 -999.990 1.535 ..P WKT 2010 06 07 23 44 55 31.3200 -97.3300 251.000 30.0 155.959 3.690 -999.990 -999.990 1.560 ..P WKT 2010 06 07 23 49 55 31.3200 -97.3300 251.000 122.0 163.390 3.810 -999.990 -999.990 1.634 ..P WKT 2010 06 08 00 09 55 31.3200 -97.3300 251.000 457.0 151.106 3.600 -999.990 -999.990 1.511 ..P WKT 2010 06 08 00 10 25 31.3200 -97.3300 251.000 457.0 153.263 3.820 -999.990 -999.990 1.533 ..P WKT 2010 06 08 00 10 55 31.3200 -97.3300 251.000 457.0 157.086 3.670 -999.990 -999.990 1.571 ..P WKT 2010 06 08 00 11 25 31.3200 -97.3300 251.000 457.0 155.352 3.860 -999.990 -999.990 1.554 ..P WKT 2010 06 08 00 11 55 31.3200 -97.3300 251.000 457.0 155.841 3.790 -999.990 -999.990 1.558 ..P WKT 2010 06 08 00 12 25 31.3200 -97.3300 251.000 457.0 154.384 4.160 -999.990 -999.990 1.544 ..P WKT 2010 06 08 00 12 55 31.3200 -97.3300 251.000 457.0 154.040 4.040 -999.990 -999.990 1.540 ..P WKT 2010 06 08 00 13 25 31.3200 -97.3300 251.000 457.0 157.030 4.030 -999.990 -999.990 1.570 ..P WKT 2010 06 08 00 13 55 31.3200 -97.3300 251.000 457.0 152.795 3.660 -999.990 -999.990 1.528 ..P WKT 2010 06 08 00 14 25 31.3200 -97.3300 251.000 457.0 152.172 4.070 -999.990 -999.990 1.522 ..P WKT 2010 06 08 00 14 55 31.3200 -97.3300 251.000 457.0 152.105 4.360 -999.990 -999.990 1.521 ..P WKT 2010 06 08 00 19 55 31.3200 -97.3300 251.000 30.0 150.325 5.070 -999.990 -999.990 1.503 ..P WKT 2010 06 08 00 24 55 31.3200 -97.3300 251.000 122.0 159.107 4.980 -999.990 -999.990 1.591 ..P WKT 2010 06 08 00 29 55 31.3200 -97.3300 251.000 457.0 154.825 4.280 -999.990 -999.990 1.548 ..P WKT 2010 06 08 00 34 55 31.3200 -97.3300 251.000 30.0 154.435 5.590 -999.990 -999.990 1.544 ..P WKT 2010 06 08 00 39 55 31.3200 -97.3300 251.000 122.0 157.659 4.940 -999.990 -999.990 1.577 ..P WKT 2010 06 08 00 44 55 31.3200 -97.3300 251.000 457.0 145.868 6.180 -999.990 -999.990 1.459 ..P WKT 2010 06 08 00 54 55 31.3200 -97.3300 251.000 30.0 147.935 5.110 -999.990 -999.990 1.479 ..P WKT 2010 06 08 00 59 55 31.3200 -97.3300 251.000 122.0 152.758 4.870 -999.990 -999.990 1.528 ..P WKT 2010 06 08 01 04 55 31.3200 -97.3300 251.000 457.0 145.343 4.700 -999.990 -999.990 1.453 ..P WKT 2010 06 08 01 09 55 31.3200 -97.3300 251.000 30.0 148.080 4.760 -999.990 -999.990 1.481 ..P WKT 2010 06 08 01 14 55 31.3200 -97.3300 251.000 122.0 152.765 4.560 -999.990 -999.990 1.528 ..P WKT 2010 06 08 01 19 55 31.3200 -97.3300 251.000 457.0 146.739 4.600 -999.990 -999.990 1.467 ..P WKT 2010 06 08 01 29 55 31.3200 -97.3300 251.000 30.0 154.620 5.090 -999.990 -999.990 1.546 ..P WKT 2010 06 08 01 34 55 31.3200 -97.3300 251.000 122.0 142.789 5.080 -999.990 -999.990 1.428 ..P WKT 2010 06 08 01 39 55 31.3200 -97.3300 251.000 457.0 150.576 4.450 -999.990 -999.990 1.506 ..P WKT 2010 06 08 01 44 55 31.3200 -97.3300 251.000 30.0 139.855 5.860 -999.990 -999.990 1.399 ..P WKT 2010 06 08 01 49 55 31.3200 -97.3300 251.000 122.0 145.278 4.620 -999.990 -999.990 1.453 ..P WKT 2010 06 08 01 54 55 31.3200 -97.3300 251.000 457.0 158.635 5.400 -999.990 -999.990 1.586 ..P WKT 2010 06 08 02 04 55 31.3200 -97.3300 251.000 30.0 137.327 4.530 -999.990 -999.990 1.373 ..P WKT 2010 06 08 02 09 55 31.3200 -97.3300 251.000 122.0 144.423 5.280 -999.990 -999.990 1.444 ..P WKT 2010 06 08 02 14 55 31.3200 -97.3300 251.000 457.0 154.582 4.380 -999.990 -999.990 1.546 ..P WKT 2010 06 08 02 19 55 31.3200 -97.3300 251.000 30.0 140.513 4.310 -999.990 -999.990 1.405 ..P WKT 2010 06 08 02 24 55 31.3200 -97.3300 251.000 122.0 146.217 4.870 -999.990 -999.990 1.462 ..P WKT 2010 06 08 02 29 55 31.3200 -97.3300 251.000 457.0 158.190 4.300 -999.990 -999.990 1.582 ..P WKT 2010 06 08 02 39 55 31.3200 -97.3300 251.000 30.0 146.421 4.460 -999.990 -999.990 1.464 ..P WKT 2010 06 08 02 44 55 31.3200 -97.3300 251.000 122.0 150.118 4.740 -999.990 -999.990 1.501 ..P WKT 2010 06 08 02 49 55 31.3200 -97.3300 251.000 457.0 158.553 5.470 -999.990 -999.990 1.586 ..P WKT 2010 06 08 02 54 55 31.3200 -97.3300 251.000 30.0 149.711 4.310 -999.990 -999.990 1.497 ..P WKT 2010 06 08 02 59 55 31.3200 -97.3300 251.000 122.0 152.573 4.770 -999.990 -999.990 1.526 ..P WKT 2010 06 08 03 04 55 31.3200 -97.3300 251.000 457.0 149.303 4.590 -999.990 -999.990 1.493 ..P WKT 2010 06 08 03 14 55 31.3200 -97.3300 251.000 30.0 140.095 4.460 -999.990 -999.990 1.401 ..P WKT 2010 06 08 03 19 55 31.3200 -97.3300 251.000 122.0 151.161 5.170 -999.990 -999.990 1.512 ..P WKT 2010 06 08 03 24 55 31.3200 -97.3300 251.000 457.0 149.683 4.710 -999.990 -999.990 1.497 ..P WKT 2010 06 08 03 29 55 31.3200 -97.3300 251.000 30.0 145.973 5.160 -999.990 -999.990 1.460 ..P WKT 2010 06 08 03 34 55 31.3200 -97.3300 251.000 122.0 156.764 5.240 -999.990 -999.990 1.568 ..P WKT 2010 06 08 03 39 55 31.3200 -97.3300 251.000 457.0 139.111 5.190 -999.990 -999.990 1.391 ..P WKT 2010 06 08 03 49 55 31.3200 -97.3300 251.000 30.0 147.388 5.930 -999.990 -999.990 1.474 ..P WKT 2010 06 08 03 54 55 31.3200 -97.3300 251.000 122.0 159.936 5.090 -999.990 -999.990 1.599 ..P WKT 2010 06 08 03 59 55 31.3200 -97.3300 251.000 457.0 115.017 4.820 -999.990 -999.990 1.150 ..P WKT 2010 06 08 04 04 55 31.3200 -97.3300 251.000 30.0 142.073 4.870 -999.990 -999.990 1.421 ..P WKT 2010 06 08 04 09 55 31.3200 -97.3300 251.000 122.0 150.996 4.840 -999.990 -999.990 1.510 ..P WKT 2010 06 08 04 14 55 31.3200 -97.3300 251.000 457.0 110.529 5.100 -999.990 -999.990 1.105 ..P WKT 2010 06 08 04 24 55 31.3200 -97.3300 251.000 30.0 148.650 4.680 -999.990 -999.990 1.487 ..P WKT 2010 06 08 04 29 55 31.3200 -97.3300 251.000 122.0 157.478 5.840 -999.990 -999.990 1.575 ..P WKT 2010 06 08 04 34 55 31.3200 -97.3300 251.000 457.0 119.689 6.780 -999.990 -999.990 1.197 ..P WKT 2010 06 08 04 39 55 31.3200 -97.3300 251.000 30.0 154.898 6.740 -999.990 -999.990 1.549 ..P WKT 2010 06 08 04 44 55 31.3200 -97.3300 251.000 122.0 155.492 6.630 -999.990 -999.990 1.555 ..P WKT 2010 06 08 04 49 55 31.3200 -97.3300 251.000 457.0 104.850 5.400 -999.990 -999.990 1.048 ..P WKT 2010 06 08 05 04 55 31.3200 -97.3300 251.000 30.0 149.131 5.460 -999.990 -999.990 1.491 ..P WKT 2010 06 08 05 09 55 31.3200 -97.3300 251.000 122.0 157.715 6.350 -999.990 -999.990 1.577 ..P WKT 2010 06 08 05 14 55 31.3200 -97.3300 251.000 457.0 110.014 6.980 -999.990 -999.990 1.100 ..P WKT 2010 06 08 05 19 55 31.3200 -97.3300 251.000 30.0 153.935 6.690 -999.990 -999.990 1.539 ..P WKT 2010 06 08 05 24 55 31.3200 -97.3300 251.000 122.0 164.897 5.920 -999.990 -999.990 1.649 ..P WKT 2010 06 08 05 29 55 31.3200 -97.3300 251.000 457.0 97.348 5.980 -999.990 -999.990 0.973 ..P WKT 2010 06 08 05 39 55 31.3200 -97.3300 251.000 30.0 154.108 5.040 -999.990 -999.990 1.541 ..P WKT 2010 06 08 05 44 55 31.3200 -97.3300 251.000 122.0 166.660 6.430 -999.990 -999.990 1.667 ..P WKT 2010 06 08 05 49 55 31.3200 -97.3300 251.000 457.0 134.914 6.660 -999.990 -999.990 1.349 ..P WKT 2010 06 08 05 54 55 31.3200 -97.3300 251.000 30.0 168.710 5.740 -999.990 -999.990 1.687 ..P WKT 2010 06 08 05 59 55 31.3200 -97.3300 251.000 122.0 166.031 5.460 -999.990 -999.990 1.660 ..P WKT 2010 06 08 06 04 55 31.3200 -97.3300 251.000 457.0 110.654 6.050 -999.990 -999.990 1.107 ..P WKT 2010 06 08 06 14 55 31.3200 -97.3300 251.000 30.0 166.800 5.430 -999.990 -999.990 1.668 ..P WKT 2010 06 08 06 19 55 31.3200 -97.3300 251.000 122.0 162.023 5.820 -999.990 -999.990 1.620 ..P WKT 2010 06 08 06 24 55 31.3200 -97.3300 251.000 457.0 101.872 5.710 -999.990 -999.990 1.019 ..P WKT 2010 06 08 06 29 55 31.3200 -97.3300 251.000 30.0 162.396 5.540 -999.990 -999.990 1.624 ..P WKT 2010 06 08 06 34 55 31.3200 -97.3300 251.000 122.0 150.344 5.200 -999.990 -999.990 1.503 ..P WKT 2010 06 08 06 39 55 31.3200 -97.3300 251.000 457.0 102.905 5.400 -999.990 -999.990 1.029 ..P WKT 2010 06 08 06 49 55 31.3200 -97.3300 251.000 30.0 154.967 5.900 -999.990 -999.990 1.550 ..P WKT 2010 06 08 06 54 55 31.3200 -97.3300 251.000 122.0 147.328 5.030 -999.990 -999.990 1.473 ..P WKT 2010 06 08 06 59 55 31.3200 -97.3300 251.000 457.0 100.512 4.830 -999.990 -999.990 1.005 ..P WKT 2010 06 08 07 04 55 31.3200 -97.3300 251.000 30.0 152.755 5.250 -999.990 -999.990 1.528 ..P WKT 2010 06 08 07 09 55 31.3200 -97.3300 251.000 122.0 140.916 5.080 -999.990 -999.990 1.409 ..P WKT 2010 06 08 07 14 55 31.3200 -97.3300 251.000 457.0 95.208 4.950 -999.990 -999.990 0.952 ..P WKT 2010 06 08 07 24 55 31.3200 -97.3300 251.000 30.0 153.018 5.790 -999.990 -999.990 1.530 ..P WKT 2010 06 08 07 29 55 31.3200 -97.3300 251.000 122.0 141.775 5.330 -999.990 -999.990 1.418 ..P WKT 2010 06 08 07 34 55 31.3200 -97.3300 251.000 457.0 98.051 5.430 -999.990 -999.990 0.981 ..P WKT 2010 06 08 07 39 55 31.3200 -97.3300 251.000 30.0 151.764 5.360 -999.990 -999.990 1.518 ..P WKT 2010 06 08 07 44 55 31.3200 -97.3300 251.000 122.0 140.798 4.860 -999.990 -999.990 1.408 ..P WKT 2010 06 08 07 49 55 31.3200 -97.3300 251.000 457.0 97.623 5.730 -999.990 -999.990 0.976 ..P WKT 2010 06 08 07 59 55 31.3200 -97.3300 251.000 30.0 145.143 5.150 -999.990 -999.990 1.451 ..P WKT 2010 06 08 08 04 55 31.3200 -97.3300 251.000 122.0 136.414 4.960 -999.990 -999.990 1.364 ..P WKT 2010 06 08 08 09 55 31.3200 -97.3300 251.000 457.0 88.463 5.310 -999.990 -999.990 0.885 ..P WKT 2010 06 08 08 14 55 31.3200 -97.3300 251.000 30.0 138.004 6.290 -999.990 -999.990 1.380 ..P WKT 2010 06 08 08 19 55 31.3200 -97.3300 251.000 122.0 127.591 5.210 -999.990 -999.990 1.276 ..P WKT 2010 06 08 08 24 55 31.3200 -97.3300 251.000 457.0 93.778 5.960 -999.990 -999.990 0.938 ..P WKT 2010 06 08 08 34 55 31.3200 -97.3300 251.000 30.0 138.042 5.840 -999.990 -999.990 1.380 ..P WKT 2010 06 08 08 39 55 31.3200 -97.3300 251.000 122.0 129.247 5.750 -999.990 -999.990 1.292 ..P WKT 2010 06 08 08 44 55 31.3200 -97.3300 251.000 457.0 99.146 5.750 -999.990 -999.990 0.991 ..P WKT 2010 06 08 08 49 55 31.3200 -97.3300 251.000 30.0 135.201 5.740 -999.990 -999.990 1.352 ..P WKT 2010 06 08 08 54 55 31.3200 -97.3300 251.000 122.0 131.310 5.780 -999.990 -999.990 1.313 ..P WKT 2010 06 08 08 59 55 31.3200 -97.3300 251.000 457.0 92.651 6.720 -999.990 -999.990 0.927 ..P WKT 2010 06 08 09 09 55 31.3200 -97.3300 251.000 30.0 131.051 6.790 -999.990 -999.990 1.311 ..P WKT 2010 06 08 09 14 55 31.3200 -97.3300 251.000 122.0 124.274 7.160 -999.990 -999.990 1.243 ..P WKT 2010 06 08 09 19 55 31.3200 -97.3300 251.000 457.0 106.837 5.860 -999.990 -999.990 1.068 ..P WKT 2010 06 08 09 24 55 31.3200 -97.3300 251.000 30.0 122.357 5.940 -999.990 -999.990 1.224 ..P WKT 2010 06 08 09 29 55 31.3200 -97.3300 251.000 122.0 123.712 5.780 -999.990 -999.990 1.237 ..P WKT 2010 06 08 09 34 55 31.3200 -97.3300 251.000 457.0 102.063 5.720 -999.990 -999.990 1.021 ..P WKT 2010 06 08 09 44 55 31.3200 -97.3300 251.000 30.0 118.781 6.330 -999.990 -999.990 1.188 ..P WKT 2010 06 08 09 49 55 31.3200 -97.3300 251.000 122.0 121.661 6.130 -999.990 -999.990 1.217 ..P WKT 2010 06 08 09 54 55 31.3200 -97.3300 251.000 457.0 99.563 5.840 -999.990 -999.990 0.996 ..P WKT 2010 06 08 09 59 55 31.3200 -97.3300 251.000 30.0 107.353 5.510 -999.990 -999.990 1.074 ..P WKT 2010 06 08 10 04 55 31.3200 -97.3300 251.000 122.0 116.687 5.680 -999.990 -999.990 1.167 ..P WKT 2010 06 08 10 09 55 31.3200 -97.3300 251.000 457.0 90.794 5.200 -999.990 -999.990 0.908 ..P WKT 2010 06 08 10 19 55 31.3200 -97.3300 251.000 30.0 113.255 5.500 -999.990 -999.990 1.133 ..P WKT 2010 06 08 10 24 55 31.3200 -97.3300 251.000 122.0 116.417 6.000 -999.990 -999.990 1.164 ..P WKT 2010 06 08 10 29 55 31.3200 -97.3300 251.000 457.0 104.274 5.530 -999.990 -999.990 1.043 ..P WKT 2010 06 08 10 34 55 31.3200 -97.3300 251.000 30.0 117.264 6.380 -999.990 -999.990 1.173 ..P WKT 2010 06 08 10 39 55 31.3200 -97.3300 251.000 122.0 118.460 6.110 -999.990 -999.990 1.185 ..P WKT 2010 06 08 10 44 55 31.3200 -97.3300 251.000 457.0 110.950 5.500 -999.990 -999.990 1.110 ..P WKT 2010 06 08 10 54 55 31.3200 -97.3300 251.000 30.0 112.419 5.510 -999.990 -999.990 1.124 ..P WKT 2010 06 08 10 59 55 31.3200 -97.3300 251.000 122.0 115.502 5.600 -999.990 -999.990 1.155 ..P WKT 2010 06 08 11 04 55 31.3200 -97.3300 251.000 457.0 97.794 6.380 -999.990 -999.990 0.978 ..P WKT 2010 06 08 11 09 55 31.3200 -97.3300 251.000 30.0 102.000 6.060 -999.990 -999.990 1.020 ..P WKT 2010 06 08 11 14 55 31.3200 -97.3300 251.000 122.0 106.488 5.850 -999.990 -999.990 1.065 ..P WKT 2010 06 08 11 19 55 31.3200 -97.3300 251.000 457.0 94.675 6.040 -999.990 -999.990 0.947 ..P WKT 2010 06 08 11 29 55 31.3200 -97.3300 251.000 30.0 120.447 6.190 -999.990 -999.990 1.204 ..P WKT 2010 06 08 11 34 55 31.3200 -97.3300 251.000 122.0 108.000 5.880 -999.990 -999.990 1.080 ..P WKT 2010 06 08 11 39 55 31.3200 -97.3300 251.000 457.0 109.328 6.350 -999.990 -999.990 1.093 ..P WKT 2010 06 08 11 44 55 31.3200 -97.3300 251.000 30.0 117.684 6.140 -999.990 -999.990 1.177 ..P WKT 2010 06 08 11 49 55 31.3200 -97.3300 251.000 122.0 108.609 6.620 -999.990 -999.990 1.086 ..P WKT 2010 06 08 12 09 55 31.3200 -97.3300 251.000 457.0 109.409 6.430 -999.990 -999.990 1.094 ..P WKT 2010 06 08 12 10 25 31.3200 -97.3300 251.000 457.0 108.275 6.440 -999.990 -999.990 1.083 ..P WKT 2010 06 08 12 10 55 31.3200 -97.3300 251.000 457.0 110.515 6.630 -999.990 -999.990 1.105 ..P WKT 2010 06 08 12 11 25 31.3200 -97.3300 251.000 457.0 107.974 6.170 -999.990 -999.990 1.080 ..P WKT 2010 06 08 12 11 55 31.3200 -97.3300 251.000 457.0 113.025 6.210 -999.990 -999.990 1.130 ..P WKT 2010 06 08 12 12 25 31.3200 -97.3300 251.000 457.0 113.015 6.200 -999.990 -999.990 1.130 ..P WKT 2010 06 08 12 12 55 31.3200 -97.3300 251.000 457.0 114.692 6.230 -999.990 -999.990 1.147 ..P WKT 2010 06 08 12 13 25 31.3200 -97.3300 251.000 457.0 103.154 6.700 -999.990 -999.990 1.032 ..P WKT 2010 06 08 12 13 55 31.3200 -97.3300 251.000 457.0 104.550 6.560 -999.990 -999.990 1.046 ..P WKT 2010 06 08 12 14 25 31.3200 -97.3300 251.000 457.0 109.882 6.100 -999.990 -999.990 1.099 ..P WKT 2010 06 08 12 14 55 31.3200 -97.3300 251.000 457.0 103.124 6.110 -999.990 -999.990 1.031 ..P WKT 2010 06 08 12 19 55 31.3200 -97.3300 251.000 30.0 117.925 6.170 -999.990 -999.990 1.179 ..P WKT 2010 06 08 12 24 55 31.3200 -97.3300 251.000 122.0 116.418 6.590 -999.990 -999.990 1.164 ..P WKT 2010 06 08 12 29 55 31.3200 -97.3300 251.000 457.0 108.025 6.020 -999.990 -999.990 1.080 ..P WKT 2010 06 08 12 34 55 31.3200 -97.3300 251.000 30.0 120.574 5.830 -999.990 -999.990 1.206 ..P WKT 2010 06 08 12 39 55 31.3200 -97.3300 251.000 122.0 121.597 6.200 -999.990 -999.990 1.216 ..P WKT 2010 06 08 12 44 55 31.3200 -97.3300 251.000 457.0 110.394 5.730 -999.990 -999.990 1.104 ..P WKT 2010 06 08 12 54 55 31.3200 -97.3300 251.000 30.0 120.344 5.650 -999.990 -999.990 1.203 ..P WKT 2010 06 08 12 59 55 31.3200 -97.3300 251.000 122.0 120.699 6.370 -999.990 -999.990 1.207 ..P WKT 2010 06 08 13 04 55 31.3200 -97.3300 251.000 457.0 110.375 6.640 -999.990 -999.990 1.104 ..P WKT 2010 06 08 13 09 55 31.3200 -97.3300 251.000 30.0 112.275 7.080 -999.990 -999.990 1.123 ..P WKT 2010 06 08 13 14 55 31.3200 -97.3300 251.000 122.0 118.810 6.440 -999.990 -999.990 1.188 ..P WKT 2010 06 08 13 19 55 31.3200 -97.3300 251.000 457.0 107.364 6.240 -999.990 -999.990 1.074 ..P WKT 2010 06 08 13 29 55 31.3200 -97.3300 251.000 30.0 118.768 5.910 -999.990 -999.990 1.188 ..P WKT 2010 06 08 13 34 55 31.3200 -97.3300 251.000 122.0 121.250 6.510 -999.990 -999.990 1.213 ..P WKT 2010 06 08 13 39 55 31.3200 -97.3300 251.000 457.0 126.118 7.770 -999.990 -999.990 1.261 ..P WKT 2010 06 08 13 44 55 31.3200 -97.3300 251.000 30.0 127.194 9.060 -999.990 -999.990 1.272 ..P WKT 2010 06 08 13 49 55 31.3200 -97.3300 251.000 122.0 134.588 8.240 -999.990 -999.990 1.346 ..P WKT 2010 06 08 13 54 55 31.3200 -97.3300 251.000 457.0 124.009 6.840 -999.990 -999.990 1.240 ..P WKT 2010 06 08 14 04 55 31.3200 -97.3300 251.000 30.0 123.994 6.580 -999.990 -999.990 1.240 ..P WKT 2010 06 08 14 09 55 31.3200 -97.3300 251.000 122.0 129.923 8.170 -999.990 -999.990 1.299 ..P WKT 2010 06 08 14 14 55 31.3200 -97.3300 251.000 457.0 120.831 9.040 -999.990 -999.990 1.208 ..P WKT 2010 06 08 14 19 55 31.3200 -97.3300 251.000 30.0 121.144 9.180 -999.990 -999.990 1.211 ..P WKT 2010 06 08 14 24 55 31.3200 -97.3300 251.000 122.0 121.037 8.360 -999.990 -999.990 1.210 ..P WKT 2010 06 08 14 29 55 31.3200 -97.3300 251.000 457.0 122.755 6.940 -999.990 -999.990 1.228 ..P WKT 2010 06 08 14 39 55 31.3200 -97.3300 251.000 30.0 113.677 6.640 -999.990 -999.990 1.137 ..P WKT 2010 06 08 14 44 55 31.3200 -97.3300 251.000 122.0 118.041 8.500 -999.990 -999.990 1.180 ..P WKT 2010 06 08 14 49 55 31.3200 -97.3300 251.000 457.0 110.336 9.220 -999.990 -999.990 1.103 ..P WKT 2010 06 08 14 54 55 31.3200 -97.3300 251.000 30.0 117.506 7.880 -999.990 -999.990 1.175 ..P WKT 2010 06 08 14 59 55 31.3200 -97.3300 251.000 122.0 119.904 6.490 -999.990 -999.990 1.199 ..P WKT 2010 06 08 15 04 55 31.3200 -97.3300 251.000 457.0 118.373 6.270 -999.990 -999.990 1.184 ..P WKT 2010 06 08 15 14 55 31.3200 -97.3300 251.000 30.0 120.564 6.200 -999.990 -999.990 1.206 ..P WKT 2010 06 08 15 19 55 31.3200 -97.3300 251.000 122.0 118.953 7.210 -999.990 -999.990 1.190 ..P WKT 2010 06 08 15 24 55 31.3200 -97.3300 251.000 457.0 122.393 7.870 -999.990 -999.990 1.224 ..P WKT 2010 06 08 15 29 55 31.3200 -97.3300 251.000 30.0 117.696 6.650 -999.990 -999.990 1.177 ..P WKT 2010 06 08 15 34 55 31.3200 -97.3300 251.000 122.0 125.343 6.310 -999.990 -999.990 1.253 ..P WKT 2010 06 08 15 39 55 31.3200 -97.3300 251.000 457.0 116.159 6.510 -999.990 -999.990 1.162 ..P WKT 2010 06 08 15 49 55 31.3200 -97.3300 251.000 30.0 116.106 6.230 -999.990 -999.990 1.161 ..P WKT 2010 06 08 15 54 55 31.3200 -97.3300 251.000 122.0 128.318 6.070 -999.990 -999.990 1.283 ..P WKT 2010 06 08 15 59 55 31.3200 -97.3300 251.000 457.0 116.132 6.380 -999.990 -999.990 1.161 ..P WKT 2010 06 08 16 04 55 31.3200 -97.3300 251.000 30.0 112.360 6.160 -999.990 -999.990 1.124 ..P WKT 2010 06 08 16 09 55 31.3200 -97.3300 251.000 122.0 125.131 6.860 -999.990 -999.990 1.251 ..P WKT 2010 06 08 16 14 55 31.3200 -97.3300 251.000 457.0 118.274 6.030 -999.990 -999.990 1.183 ..P WKT 2010 06 08 16 24 55 31.3200 -97.3300 251.000 30.0 124.247 6.400 -999.990 -999.990 1.242 ..P WKT 2010 06 08 16 29 55 31.3200 -97.3300 251.000 122.0 134.692 6.050 -999.990 -999.990 1.347 ..P WKT 2010 06 08 16 34 55 31.3200 -97.3300 251.000 457.0 124.814 6.140 -999.990 -999.990 1.248 ..P WKT 2010 06 08 16 39 55 31.3200 -97.3300 251.000 30.0 122.223 6.240 -999.990 -999.990 1.222 ..P WKT 2010 06 08 16 44 55 31.3200 -97.3300 251.000 122.0 124.958 6.010 -999.990 -999.990 1.250 ..P WKT 2010 06 08 16 49 55 31.3200 -97.3300 251.000 457.0 126.012 6.030 -999.990 -999.990 1.260 ..P WKT 2010 06 08 17 04 55 31.3200 -97.3300 251.000 30.0 108.801 6.920 -999.990 -999.990 1.088 ..P WKT 2010 06 08 17 09 55 31.3200 -97.3300 251.000 122.0 117.673 6.100 -999.990 -999.990 1.177 ..P WKT 2010 06 08 17 14 55 31.3200 -97.3300 251.000 457.0 108.053 6.540 -999.990 -999.990 1.081 ..P WKT 2010 06 08 17 19 55 31.3200 -97.3300 251.000 30.0 108.239 7.960 -999.990 -999.990 1.082 ..P WKT 2010 06 08 17 24 55 31.3200 -97.3300 251.000 122.0 115.849 6.520 -999.990 -999.990 1.158 ..P WKT 2010 06 08 17 29 55 31.3200 -97.3300 251.000 457.0 112.253 6.700 -999.990 -999.990 1.123 ..P WKT 2010 06 08 17 39 55 31.3200 -97.3300 251.000 30.0 107.169 7.420 -999.990 -999.990 1.072 ..P WKT 2010 06 08 17 44 55 31.3200 -97.3300 251.000 122.0 113.246 6.620 -999.990 -999.990 1.132 ..P WKT 2010 06 08 17 49 55 31.3200 -97.3300 251.000 457.0 106.017 6.530 -999.990 -999.990 1.060 ..P WKT 2010 06 08 17 54 55 31.3200 -97.3300 251.000 30.0 104.810 6.470 -999.990 -999.990 1.048 ..P WKT 2010 06 08 17 59 55 31.3200 -97.3300 251.000 122.0 109.625 6.750 -999.990 -999.990 1.096 ..P WKT 2010 06 08 18 04 55 31.3200 -97.3300 251.000 457.0 109.818 6.190 -999.990 -999.990 1.098 ..P WKT 2010 06 08 18 14 55 31.3200 -97.3300 251.000 30.0 107.566 6.780 -999.990 -999.990 1.076 ..P WKT 2010 06 08 18 19 55 31.3200 -97.3300 251.000 122.0 121.638 6.020 -999.990 -999.990 1.216 ..P WKT 2010 06 08 18 24 55 31.3200 -97.3300 251.000 457.0 114.571 6.880 -999.990 -999.990 1.146 ..P WKT 2010 06 08 18 29 55 31.3200 -97.3300 251.000 30.0 102.467 6.070 -999.990 -999.990 1.025 ..P WKT 2010 06 08 18 34 55 31.3200 -97.3300 251.000 122.0 116.117 6.510 -999.990 -999.990 1.161 ..P WKT 2010 06 08 18 39 55 31.3200 -97.3300 251.000 457.0 109.892 6.210 -999.990 -999.990 1.099 ..P WKT 2010 06 08 18 49 55 31.3200 -97.3300 251.000 30.0 105.061 5.830 -999.990 -999.990 1.051 ..P WKT 2010 06 08 18 54 55 31.3200 -97.3300 251.000 122.0 109.812 6.050 -999.990 -999.990 1.098 ..P WKT 2010 06 08 18 59 55 31.3200 -97.3300 251.000 457.0 105.888 6.420 -999.990 -999.990 1.059 ..P WKT 2010 06 08 19 04 55 31.3200 -97.3300 251.000 30.0 110.079 6.020 -999.990 -999.990 1.101 ..P WKT 2010 06 08 19 09 55 31.3200 -97.3300 251.000 122.0 105.316 5.770 -999.990 -999.990 1.053 ..P WKT 2010 06 08 19 14 55 31.3200 -97.3300 251.000 457.0 95.517 5.780 -999.990 -999.990 0.955 ..P WKT 2010 06 08 19 24 55 31.3200 -97.3300 251.000 30.0 105.617 6.320 -999.990 -999.990 1.056 ..P WKT 2010 06 08 19 29 55 31.3200 -97.3300 251.000 122.0 103.412 6.040 -999.990 -999.990 1.034 ..P WKT 2010 06 08 19 34 55 31.3200 -97.3300 251.000 457.0 101.488 5.730 -999.990 -999.990 1.015 ..P WKT 2010 06 08 19 39 55 31.3200 -97.3300 251.000 30.0 102.081 5.890 -999.990 -999.990 1.021 ..P WKT 2010 06 08 19 44 55 31.3200 -97.3300 251.000 122.0 103.793 5.730 -999.990 -999.990 1.038 ..P WKT 2010 06 08 19 49 55 31.3200 -97.3300 251.000 457.0 98.513 6.290 -999.990 -999.990 0.985 ..P WKT 2010 06 08 19 59 55 31.3200 -97.3300 251.000 30.0 102.156 5.760 -999.990 -999.990 1.022 ..P WKT 2010 06 08 20 04 55 31.3200 -97.3300 251.000 122.0 110.799 6.010 -999.990 -999.990 1.108 ..P WKT 2010 06 08 20 09 55 31.3200 -97.3300 251.000 457.0 104.062 5.880 -999.990 -999.990 1.041 ..P WKT 2010 06 08 20 14 55 31.3200 -97.3300 251.000 30.0 101.799 5.850 -999.990 -999.990 1.018 ..P WKT 2010 06 08 20 19 55 31.3200 -97.3300 251.000 122.0 106.245 6.570 -999.990 -999.990 1.062 ..P WKT 2010 06 08 20 24 55 31.3200 -97.3300 251.000 457.0 103.703 6.340 -999.990 -999.990 1.037 ..P WKT 2010 06 08 20 34 55 31.3200 -97.3300 251.000 30.0 108.163 7.100 -999.990 -999.990 1.082 ..P WKT 2010 06 08 20 39 55 31.3200 -97.3300 251.000 122.0 111.531 6.550 -999.990 -999.990 1.115 ..P WKT 2010 06 08 20 44 55 31.3200 -97.3300 251.000 457.0 105.535 6.310 -999.990 -999.990 1.055 ..P WKT 2010 06 08 20 49 55 31.3200 -97.3300 251.000 30.0 107.924 6.290 -999.990 -999.990 1.079 ..P WKT 2010 06 08 20 54 55 31.3200 -97.3300 251.000 122.0 111.571 6.550 -999.990 -999.990 1.116 ..P WKT 2010 06 08 20 59 55 31.3200 -97.3300 251.000 457.0 108.789 6.500 -999.990 -999.990 1.088 ..P WKT 2010 06 08 21 09 55 31.3200 -97.3300 251.000 30.0 102.989 6.530 -999.990 -999.990 1.030 ..P WKT 2010 06 08 21 14 55 31.3200 -97.3300 251.000 122.0 111.984 6.390 -999.990 -999.990 1.120 ..P WKT 2010 06 08 21 19 55 31.3200 -97.3300 251.000 457.0 113.294 6.350 -999.990 -999.990 1.133 ..P WKT 2010 06 08 21 24 55 31.3200 -97.3300 251.000 30.0 115.303 6.400 -999.990 -999.990 1.153 ..P WKT 2010 06 08 21 29 55 31.3200 -97.3300 251.000 122.0 121.502 6.240 -999.990 -999.990 1.215 ..P WKT 2010 06 08 21 34 55 31.3200 -97.3300 251.000 457.0 115.688 6.360 -999.990 -999.990 1.157 ..P WKT 2010 06 08 21 44 55 31.3200 -97.3300 251.000 30.0 107.415 6.160 -999.990 -999.990 1.074 ..P WKT 2010 06 08 21 49 55 31.3200 -97.3300 251.000 122.0 116.266 6.510 -999.990 -999.990 1.163 ..P WKT 2010 06 08 21 54 55 31.3200 -97.3300 251.000 457.0 113.108 7.340 -999.990 -999.990 1.131 ..P WKT 2010 06 08 21 59 55 31.3200 -97.3300 251.000 30.0 103.108 6.110 -999.990 -999.990 1.031 ..P WKT 2010 06 08 22 04 55 31.3200 -97.3300 251.000 122.0 107.908 7.120 -999.990 -999.990 1.079 ..P WKT 2010 06 08 22 09 55 31.3200 -97.3300 251.000 457.0 106.566 6.400 -999.990 -999.990 1.066 ..P WKT 2010 06 08 22 19 55 31.3200 -97.3300 251.000 30.0 112.695 6.540 -999.990 -999.990 1.127 ..P WKT 2010 06 08 22 24 55 31.3200 -97.3300 251.000 122.0 120.445 6.560 -999.990 -999.990 1.204 ..P WKT 2010 06 08 22 29 55 31.3200 -97.3300 251.000 457.0 113.678 5.980 -999.990 -999.990 1.137 ..P WKT 2010 06 08 22 34 55 31.3200 -97.3300 251.000 30.0 110.262 5.810 -999.990 -999.990 1.103 ..P WKT 2010 06 08 22 39 55 31.3200 -97.3300 251.000 122.0 116.895 5.940 -999.990 -999.990 1.169 ..P WKT 2010 06 08 22 44 55 31.3200 -97.3300 251.000 457.0 112.641 5.980 -999.990 -999.990 1.126 ..P WKT 2010 06 08 22 54 55 31.3200 -97.3300 251.000 30.0 112.209 5.950 -999.990 -999.990 1.122 ..P WKT 2010 06 08 22 59 55 31.3200 -97.3300 251.000 122.0 109.332 6.290 -999.990 -999.990 1.093 ..P WKT 2010 06 08 23 04 55 31.3200 -97.3300 251.000 457.0 107.014 5.900 -999.990 -999.990 1.070 ..P WKT 2010 06 08 23 09 55 31.3200 -97.3300 251.000 30.0 109.438 6.200 -999.990 -999.990 1.094 ..P WKT 2010 06 08 23 14 55 31.3200 -97.3300 251.000 122.0 111.305 6.000 -999.990 -999.990 1.113 ..P WKT 2010 06 08 23 19 55 31.3200 -97.3300 251.000 457.0 110.103 6.420 -999.990 -999.990 1.101 ..P WKT 2010 06 08 23 29 55 31.3200 -97.3300 251.000 30.0 114.229 5.990 -999.990 -999.990 1.142 ..P WKT 2010 06 08 23 34 55 31.3200 -97.3300 251.000 122.0 119.000 6.640 -999.990 -999.990 1.190 ..P WKT 2010 06 08 23 39 55 31.3200 -97.3300 251.000 457.0 107.871 6.720 -999.990 -999.990 1.079 ..P WKT 2010 06 08 23 44 55 31.3200 -97.3300 251.000 30.0 110.966 6.260 -999.990 -999.990 1.110 ..P WKT 2010 06 08 23 49 55 31.3200 -97.3300 251.000 122.0 121.872 6.290 -999.990 -999.990 1.219 ..P WKT 2010 06 09 00 09 55 31.3200 -97.3300 251.000 457.0 111.954 5.550 -999.990 -999.990 1.120 ..P WKT 2010 06 09 00 10 25 31.3200 -97.3300 251.000 457.0 105.820 5.780 -999.990 -999.990 1.058 ..P WKT 2010 06 09 00 10 55 31.3200 -97.3300 251.000 457.0 103.032 5.910 -999.990 -999.990 1.030 ..P WKT 2010 06 09 00 11 25 31.3200 -97.3300 251.000 457.0 103.868 5.920 -999.990 -999.990 1.039 ..P WKT 2010 06 09 00 11 55 31.3200 -97.3300 251.000 457.0 108.887 5.690 -999.990 -999.990 1.089 ..P WKT 2010 06 09 00 12 25 31.3200 -97.3300 251.000 457.0 105.541 5.700 -999.990 -999.990 1.055 ..P WKT 2010 06 09 00 12 55 31.3200 -97.3300 251.000 457.0 106.098 6.360 -999.990 -999.990 1.061 ..P WKT 2010 06 09 00 13 25 31.3200 -97.3300 251.000 457.0 103.031 5.790 -999.990 -999.990 1.030 ..P WKT 2010 06 09 00 13 55 31.3200 -97.3300 251.000 457.0 109.025 5.620 -999.990 -999.990 1.090 ..P WKT 2010 06 09 00 14 25 31.3200 -97.3300 251.000 457.0 110.140 5.710 -999.990 -999.990 1.101 ..P WKT 2010 06 09 00 14 55 31.3200 -97.3300 251.000 457.0 107.909 5.910 -999.990 -999.990 1.079 ..P WKT 2010 06 09 00 19 55 31.3200 -97.3300 251.000 30.0 129.095 5.740 -999.990 -999.990 1.291 ..P WKT 2010 06 09 00 24 55 31.3200 -97.3300 251.000 122.0 140.662 6.270 -999.990 -999.990 1.407 ..P WKT 2010 06 09 00 29 55 31.3200 -97.3300 251.000 457.0 112.923 6.080 -999.990 -999.990 1.129 ..P WKT 2010 06 09 00 34 55 31.3200 -97.3300 251.000 30.0 168.806 6.380 -999.990 -999.990 1.688 ..P WKT 2010 06 09 00 39 55 31.3200 -97.3300 251.000 122.0 174.096 6.690 -999.990 -999.990 1.741 ..P WKT 2010 06 09 00 44 55 31.3200 -97.3300 251.000 457.0 111.523 5.860 -999.990 -999.990 1.115 ..P WKT 2010 06 09 00 54 55 31.3200 -97.3300 251.000 30.0 133.032 6.050 -999.990 -999.990 1.330 ..P WKT 2010 06 09 00 59 55 31.3200 -97.3300 251.000 122.0 130.716 5.720 -999.990 -999.990 1.307 ..P WKT 2010 06 09 01 04 55 31.3200 -97.3300 251.000 457.0 117.673 6.120 -999.990 -999.990 1.177 ..P WKT 2010 06 09 01 09 55 31.3200 -97.3300 251.000 30.0 127.338 5.610 -999.990 -999.990 1.273 ..P WKT 2010 06 09 01 14 55 31.3200 -97.3300 251.000 122.0 121.122 5.680 -999.990 -999.990 1.211 ..P WKT 2010 06 09 01 19 55 31.3200 -97.3300 251.000 457.0 122.847 6.280 -999.990 -999.990 1.228 ..P WKT 2010 06 09 01 29 55 31.3200 -97.3300 251.000 30.0 129.935 5.570 -999.990 -999.990 1.299 ..P WKT 2010 06 09 01 34 55 31.3200 -97.3300 251.000 122.0 130.843 5.650 -999.990 -999.990 1.308 ..P WKT 2010 06 09 01 39 55 31.3200 -97.3300 251.000 457.0 129.105 5.800 -999.990 -999.990 1.291 ..P WKT 2010 06 09 01 44 55 31.3200 -97.3300 251.000 30.0 127.368 5.870 -999.990 -999.990 1.274 ..P WKT 2010 06 09 01 49 55 31.3200 -97.3300 251.000 122.0 128.832 6.010 -999.990 -999.990 1.288 ..P WKT 2010 06 09 01 54 55 31.3200 -97.3300 251.000 457.0 126.816 5.970 -999.990 -999.990 1.268 ..P WKT 2010 06 09 02 04 55 31.3200 -97.3300 251.000 30.0 128.651 6.090 -999.990 -999.990 1.287 ..P WKT 2010 06 09 02 09 55 31.3200 -97.3300 251.000 122.0 135.285 6.050 -999.990 -999.990 1.353 ..P WKT 2010 06 09 02 14 55 31.3200 -97.3300 251.000 457.0 125.078 6.000 -999.990 -999.990 1.251 ..P WKT 2010 06 09 02 19 55 31.3200 -97.3300 251.000 30.0 130.041 6.520 -999.990 -999.990 1.300 ..P WKT 2010 06 09 02 24 55 31.3200 -97.3300 251.000 122.0 136.673 6.180 -999.990 -999.990 1.367 ..P WKT 2010 06 09 02 29 55 31.3200 -97.3300 251.000 457.0 128.555 5.800 -999.990 -999.990 1.286 ..P WKT 2010 06 09 02 39 55 31.3200 -97.3300 251.000 30.0 134.285 5.650 -999.990 -999.990 1.343 ..P WKT 2010 06 09 02 44 55 31.3200 -97.3300 251.000 122.0 135.608 5.610 -999.990 -999.990 1.356 ..P WKT 2010 06 09 02 49 55 31.3200 -97.3300 251.000 457.0 122.465 6.820 -999.990 -999.990 1.225 ..P WKT 2010 06 09 02 54 55 31.3200 -97.3300 251.000 30.0 135.752 5.560 -999.990 -999.990 1.358 ..P WKT 2010 06 09 02 59 55 31.3200 -97.3300 251.000 122.0 128.452 5.030 -999.990 -999.990 1.285 ..P WKT 2010 06 09 03 04 55 31.3200 -97.3300 251.000 457.0 119.484 4.980 -999.990 -999.990 1.195 ..P WKT 2010 06 09 03 14 55 31.3200 -97.3300 251.000 30.0 126.702 5.450 -999.990 -999.990 1.267 ..P WKT 2010 06 09 03 19 55 31.3200 -97.3300 251.000 122.0 130.370 4.960 -999.990 -999.990 1.304 ..P WKT 2010 06 09 03 24 55 31.3200 -97.3300 251.000 457.0 122.636 5.150 -999.990 -999.990 1.226 ..P WKT 2010 06 09 03 29 55 31.3200 -97.3300 251.000 30.0 136.314 5.250 -999.990 -999.990 1.363 ..P WKT 2010 06 09 03 34 55 31.3200 -97.3300 251.000 122.0 135.810 5.280 -999.990 -999.990 1.358 ..P WKT 2010 06 09 03 39 55 31.3200 -97.3300 251.000 457.0 108.338 5.440 -999.990 -999.990 1.083 ..P WKT 2010 06 09 03 49 55 31.3200 -97.3300 251.000 30.0 136.223 5.460 -999.990 -999.990 1.362 ..P WKT 2010 06 09 03 54 55 31.3200 -97.3300 251.000 122.0 141.259 5.400 -999.990 -999.990 1.413 ..P WKT 2010 06 09 03 59 55 31.3200 -97.3300 251.000 457.0 101.544 5.370 -999.990 -999.990 1.015 ..P WKT 2010 06 09 04 04 55 31.3200 -97.3300 251.000 30.0 132.984 5.450 -999.990 -999.990 1.330 ..P WKT 2010 06 09 04 09 55 31.3200 -97.3300 251.000 122.0 131.766 6.320 -999.990 -999.990 1.318 ..P WKT 2010 06 09 04 14 55 31.3200 -97.3300 251.000 457.0 94.701 4.840 -999.990 -999.990 0.947 ..P WKT 2010 06 09 04 24 55 31.3200 -97.3300 251.000 30.0 132.438 4.720 -999.990 -999.990 1.324 ..P WKT 2010 06 09 04 29 55 31.3200 -97.3300 251.000 122.0 128.323 4.960 -999.990 -999.990 1.283 ..P WKT 2010 06 09 04 34 55 31.3200 -97.3300 251.000 457.0 108.234 5.440 -999.990 -999.990 1.082 ..P WKT 2010 06 09 04 39 55 31.3200 -97.3300 251.000 30.0 125.372 5.240 -999.990 -999.990 1.254 ..P WKT 2010 06 09 04 44 55 31.3200 -97.3300 251.000 122.0 135.702 5.450 -999.990 -999.990 1.357 ..P WKT 2010 06 09 04 49 55 31.3200 -97.3300 251.000 457.0 119.367 5.470 -999.990 -999.990 1.194 ..P WKT 2010 06 09 05 04 55 31.3200 -97.3300 251.000 30.0 127.256 5.580 -999.990 -999.990 1.273 ..P WKT 2010 06 09 05 09 55 31.3200 -97.3300 251.000 122.0 135.338 5.210 -999.990 -999.990 1.353 ..P WKT 2010 06 09 05 14 55 31.3200 -97.3300 251.000 457.0 108.297 5.320 -999.990 -999.990 1.083 ..P WKT 2010 06 09 05 19 55 31.3200 -97.3300 251.000 30.0 126.374 5.100 -999.990 -999.990 1.264 ..P WKT 2010 06 09 05 24 55 31.3200 -97.3300 251.000 122.0 140.840 5.790 -999.990 -999.990 1.408 ..P WKT 2010 06 09 05 29 55 31.3200 -97.3300 251.000 457.0 113.249 5.270 -999.990 -999.990 1.132 ..P WKT 2010 06 09 05 39 55 31.3200 -97.3300 251.000 30.0 130.423 4.700 -999.990 -999.990 1.304 ..P WKT 2010 06 09 05 44 55 31.3200 -97.3300 251.000 122.0 149.783 4.990 -999.990 -999.990 1.498 ..P WKT 2010 06 09 05 49 55 31.3200 -97.3300 251.000 457.0 116.414 4.820 -999.990 -999.990 1.164 ..P WKT 2010 06 09 05 54 55 31.3200 -97.3300 251.000 30.0 125.367 5.110 -999.990 -999.990 1.254 ..P WKT 2010 06 09 05 59 55 31.3200 -97.3300 251.000 122.0 154.296 5.520 -999.990 -999.990 1.543 ..P WKT 2010 06 09 06 04 55 31.3200 -97.3300 251.000 457.0 111.500 4.880 -999.990 -999.990 1.115 ..P WKT 2010 06 09 06 14 55 31.3200 -97.3300 251.000 30.0 133.067 4.400 -999.990 -999.990 1.331 ..P WKT 2010 06 09 06 19 55 31.3200 -97.3300 251.000 122.0 172.588 4.700 -999.990 -999.990 1.726 ..P WKT 2010 06 09 06 24 55 31.3200 -97.3300 251.000 457.0 108.366 4.850 -999.990 -999.990 1.084 ..P WKT 2010 06 09 06 29 55 31.3200 -97.3300 251.000 30.0 134.570 4.460 -999.990 -999.990 1.346 ..P WKT 2010 06 09 06 34 55 31.3200 -97.3300 251.000 122.0 159.661 4.670 -999.990 -999.990 1.597 ..P WKT 2010 06 09 06 39 55 31.3200 -97.3300 251.000 457.0 144.816 4.760 -999.990 -999.990 1.448 ..P WKT 2010 06 09 06 49 55 31.3200 -97.3300 251.000 30.0 130.619 4.710 -999.990 -999.990 1.306 ..P WKT 2010 06 09 06 54 55 31.3200 -97.3300 251.000 122.0 129.047 5.930 -999.990 -999.990 1.290 ..P WKT 2010 06 09 06 59 55 31.3200 -97.3300 251.000 457.0 98.643 4.800 -999.990 -999.990 0.986 ..P WKT 2010 06 09 07 04 55 31.3200 -97.3300 251.000 30.0 124.241 4.890 -999.990 -999.990 1.242 ..P WKT 2010 06 09 07 09 55 31.3200 -97.3300 251.000 122.0 132.094 5.540 -999.990 -999.990 1.321 ..P WKT 2010 06 09 07 14 55 31.3200 -97.3300 251.000 457.0 103.637 4.660 -999.990 -999.990 1.036 ..P WKT 2010 06 09 07 24 55 31.3200 -97.3300 251.000 30.0 126.549 4.430 -999.990 -999.990 1.265 ..P WKT 2010 06 09 07 29 55 31.3200 -97.3300 251.000 122.0 138.834 4.590 -999.990 -999.990 1.388 ..P WKT 2010 06 09 07 34 55 31.3200 -97.3300 251.000 457.0 105.674 4.480 -999.990 -999.990 1.057 ..P WKT 2010 06 09 07 39 55 31.3200 -97.3300 251.000 30.0 136.800 5.700 -999.990 -999.990 1.368 ..P WKT 2010 06 09 07 44 55 31.3200 -97.3300 251.000 122.0 152.683 4.810 -999.990 -999.990 1.527 ..P WKT 2010 06 09 07 49 55 31.3200 -97.3300 251.000 457.0 108.724 4.650 -999.990 -999.990 1.087 ..P WKT 2010 06 09 07 59 55 31.3200 -97.3300 251.000 30.0 136.175 6.230 -999.990 -999.990 1.362 ..P WKT 2010 06 09 08 04 55 31.3200 -97.3300 251.000 122.0 137.493 4.670 -999.990 -999.990 1.375 ..P WKT 2010 06 09 08 09 55 31.3200 -97.3300 251.000 457.0 100.175 5.680 -999.990 -999.990 1.002 ..P WKT 2010 06 09 08 14 55 31.3200 -97.3300 251.000 30.0 138.190 4.650 -999.990 -999.990 1.382 ..P WKT 2010 06 09 08 19 55 31.3200 -97.3300 251.000 122.0 141.445 6.740 -999.990 -999.990 1.414 ..P WKT 2010 06 09 08 24 55 31.3200 -97.3300 251.000 457.0 96.798 4.440 -999.990 -999.990 0.968 ..P WKT 2010 06 09 08 34 55 31.3200 -97.3300 251.000 30.0 147.097 4.360 -999.990 -999.990 1.471 ..P WKT 2010 06 09 08 39 55 31.3200 -97.3300 251.000 122.0 132.673 4.550 -999.990 -999.990 1.327 ..P WKT 2010 06 09 08 44 55 31.3200 -97.3300 251.000 457.0 96.107 4.860 -999.990 -999.990 0.961 ..P WKT 2010 06 09 08 49 55 31.3200 -97.3300 251.000 30.0 149.365 4.220 -999.990 -999.990 1.494 ..P WKT 2010 06 09 08 54 55 31.3200 -97.3300 251.000 122.0 159.024 4.280 -999.990 -999.990 1.590 ..P WKT 2010 06 09 08 59 55 31.3200 -97.3300 251.000 457.0 99.630 3.960 -999.990 -999.990 0.996 ..P WKT 2010 06 09 09 09 55 31.3200 -97.3300 251.000 30.0 163.265 4.420 -999.990 -999.990 1.633 ..P WKT 2010 06 09 09 14 55 31.3200 -97.3300 251.000 122.0 148.334 4.920 -999.990 -999.990 1.483 ..P WKT 2010 06 09 09 19 55 31.3200 -97.3300 251.000 457.0 102.417 4.050 -999.990 -999.990 1.024 ..P WKT 2010 06 09 09 24 55 31.3200 -97.3300 251.000 30.0 164.125 5.170 -999.990 -999.990 1.641 ..P WKT 2010 06 09 09 29 55 31.3200 -97.3300 251.000 122.0 152.794 4.910 -999.990 -999.990 1.528 ..P WKT 2010 06 09 09 34 55 31.3200 -97.3300 251.000 457.0 96.513 5.150 -999.990 -999.990 0.965 ..P WKT 2010 06 09 09 44 55 31.3200 -97.3300 251.000 30.0 152.827 5.390 -999.990 -999.990 1.528 ..P WKT 2010 06 09 09 49 55 31.3200 -97.3300 251.000 122.0 141.775 4.870 -999.990 -999.990 1.418 ..P WKT 2010 06 09 09 54 55 31.3200 -97.3300 251.000 457.0 116.761 4.890 -999.990 -999.990 1.168 ..P WKT 2010 06 09 09 59 55 31.3200 -97.3300 251.000 30.0 144.979 4.200 -999.990 -999.990 1.450 ..P WKT 2010 06 09 10 04 55 31.3200 -97.3300 251.000 122.0 141.534 4.500 -999.990 -999.990 1.415 ..P WKT 2010 06 09 10 09 55 31.3200 -97.3300 251.000 457.0 114.728 3.660 -999.990 -999.990 1.147 ..P WKT 2010 06 09 10 19 55 31.3200 -97.3300 251.000 30.0 123.640 3.680 -999.990 -999.990 1.236 ..P WKT 2010 06 09 10 24 55 31.3200 -97.3300 251.000 122.0 119.270 3.660 -999.990 -999.990 1.193 ..P WKT 2010 06 09 10 29 55 31.3200 -97.3300 251.000 457.0 106.333 4.070 -999.990 -999.990 1.063 ..P WKT 2010 06 09 10 34 55 31.3200 -97.3300 251.000 30.0 114.678 4.570 -999.990 -999.990 1.147 ..P WKT 2010 06 09 10 39 55 31.3200 -97.3300 251.000 122.0 110.309 3.860 -999.990 -999.990 1.103 ..P WKT 2010 06 09 10 44 55 31.3200 -97.3300 251.000 457.0 108.429 3.540 -999.990 -999.990 1.084 ..P WKT 2010 06 09 10 54 55 31.3200 -97.3300 251.000 30.0 110.233 3.520 -999.990 -999.990 1.102 ..P WKT 2010 06 09 10 59 55 31.3200 -97.3300 251.000 122.0 118.890 4.100 -999.990 -999.990 1.189 ..P WKT 2010 06 09 11 04 55 31.3200 -97.3300 251.000 457.0 106.552 4.450 -999.990 -999.990 1.066 ..P WKT 2010 06 09 11 09 55 31.3200 -97.3300 251.000 30.0 110.788 5.300 -999.990 -999.990 1.108 ..P WKT 2010 06 09 11 14 55 31.3200 -97.3300 251.000 122.0 115.853 6.010 -999.990 -999.990 1.159 ..P WKT 2010 06 09 11 19 55 31.3200 -97.3300 251.000 457.0 119.260 3.440 -999.990 -999.990 1.193 ..P WKT 2010 06 09 11 29 55 31.3200 -97.3300 251.000 30.0 110.856 4.930 -999.990 -999.990 1.109 ..P WKT 2010 06 09 11 34 55 31.3200 -97.3300 251.000 122.0 112.303 4.380 -999.990 -999.990 1.123 ..P WKT 2010 06 09 11 39 55 31.3200 -97.3300 251.000 457.0 111.540 4.950 -999.990 -999.990 1.115 ..P WKT 2010 06 09 11 44 55 31.3200 -97.3300 251.000 30.0 115.195 4.680 -999.990 -999.990 1.152 ..P WKT 2010 06 09 11 49 55 31.3200 -97.3300 251.000 122.0 116.089 3.490 -999.990 -999.990 1.161 ..P WKT 2010 06 09 12 09 55 31.3200 -97.3300 251.000 457.0 107.169 3.820 -999.990 -999.990 1.072 ..P WKT 2010 06 09 12 10 25 31.3200 -97.3300 251.000 457.0 113.644 3.860 -999.990 -999.990 1.136 ..P WKT 2010 06 09 12 10 55 31.3200 -97.3300 251.000 457.0 112.251 3.730 -999.990 -999.990 1.123 ..P WKT 2010 06 09 12 11 25 31.3200 -97.3300 251.000 457.0 108.651 3.680 -999.990 -999.990 1.087 ..P WKT 2010 06 09 12 11 55 31.3200 -97.3300 251.000 457.0 108.915 4.490 -999.990 -999.990 1.089 ..P WKT 2010 06 09 12 12 25 31.3200 -97.3300 251.000 457.0 104.900 3.910 -999.990 -999.990 1.049 ..P WKT 2010 06 09 12 12 55 31.3200 -97.3300 251.000 457.0 108.201 3.650 -999.990 -999.990 1.082 ..P WKT 2010 06 09 12 13 25 31.3200 -97.3300 251.000 457.0 105.015 3.710 -999.990 -999.990 1.050 ..P WKT 2010 06 09 12 13 55 31.3200 -97.3300 251.000 457.0 113.699 5.100 -999.990 -999.990 1.137 ..P WKT 2010 06 09 12 14 25 31.3200 -97.3300 251.000 457.0 112.859 3.640 -999.990 -999.990 1.129 ..P WKT 2010 06 09 12 14 55 31.3200 -97.3300 251.000 457.0 109.534 3.790 -999.990 -999.990 1.095 ..P WKT 2010 06 09 12 19 55 31.3200 -97.3300 251.000 30.0 110.933 4.130 -999.990 -999.990 1.109 ..P WKT 2010 06 09 12 24 55 31.3200 -97.3300 251.000 122.0 113.988 3.620 -999.990 -999.990 1.140 ..P WKT 2010 06 09 12 29 55 31.3200 -97.3300 251.000 457.0 105.863 4.050 -999.990 -999.990 1.059 ..P WKT 2010 06 09 12 34 55 31.3200 -97.3300 251.000 30.0 113.199 4.680 -999.990 -999.990 1.132 ..P WKT 2010 06 09 12 39 55 31.3200 -97.3300 251.000 122.0 120.672 4.090 -999.990 -999.990 1.207 ..P WKT 2010 06 09 12 44 55 31.3200 -97.3300 251.000 457.0 112.132 4.090 -999.990 -999.990 1.121 ..P WKT 2010 06 09 12 54 55 31.3200 -97.3300 251.000 30.0 115.252 4.270 -999.990 -999.990 1.153 ..P WKT 2010 06 09 12 59 55 31.3200 -97.3300 251.000 122.0 116.833 4.500 -999.990 -999.990 1.168 ..P WKT 2010 06 09 13 04 55 31.3200 -97.3300 251.000 457.0 107.507 4.280 -999.990 -999.990 1.075 ..P WKT 2010 06 09 13 09 55 31.3200 -97.3300 251.000 30.0 117.098 5.170 -999.990 -999.990 1.171 ..P WKT 2010 06 09 13 14 55 31.3200 -97.3300 251.000 122.0 117.851 4.770 -999.990 -999.990 1.179 ..P WKT 2010 06 09 13 19 55 31.3200 -97.3300 251.000 457.0 115.981 4.840 -999.990 -999.990 1.160 ..P WKT 2010 06 09 13 29 55 31.3200 -97.3300 251.000 30.0 119.047 5.380 -999.990 -999.990 1.190 ..P WKT 2010 06 09 13 34 55 31.3200 -97.3300 251.000 122.0 117.354 4.380 -999.990 -999.990 1.174 ..P WKT 2010 06 09 13 39 55 31.3200 -97.3300 251.000 457.0 116.766 4.070 -999.990 -999.990 1.168 ..P WKT 2010 06 09 13 44 55 31.3200 -97.3300 251.000 30.0 116.869 3.510 -999.990 -999.990 1.169 ..P WKT 2010 06 09 13 49 55 31.3200 -97.3300 251.000 122.0 120.010 3.520 -999.990 -999.990 1.200 ..P WKT 2010 06 09 13 54 55 31.3200 -97.3300 251.000 457.0 111.134 3.080 -999.990 -999.990 1.111 ..P WKT 2010 06 09 14 04 55 31.3200 -97.3300 251.000 30.0 117.950 3.860 -999.990 -999.990 1.179 ..P WKT 2010 06 09 14 09 55 31.3200 -97.3300 251.000 122.0 123.697 2.810 -999.990 -999.990 1.237 ..P WKT 2010 06 09 14 14 55 31.3200 -97.3300 251.000 457.0 111.208 2.720 -999.990 -999.990 1.112 ..P WKT 2010 06 09 14 19 55 31.3200 -97.3300 251.000 30.0 120.271 3.320 -999.990 -999.990 1.203 ..P WKT 2010 06 09 14 24 55 31.3200 -97.3300 251.000 122.0 131.822 4.080 -999.990 -999.990 1.318 ..P WKT 2010 06 09 14 29 55 31.3200 -97.3300 251.000 457.0 119.056 3.080 -999.990 -999.990 1.191 ..P WKT 2010 06 09 14 39 55 31.3200 -97.3300 251.000 30.0 122.991 6.690 -999.990 -999.990 1.230 ..P WKT 2010 06 09 14 44 55 31.3200 -97.3300 251.000 122.0 125.601 4.130 -999.990 -999.990 1.256 ..P WKT 2010 06 09 14 49 55 31.3200 -97.3300 251.000 457.0 108.035 4.880 -999.990 -999.990 1.080 ..P WKT 2010 06 09 14 54 55 31.3200 -97.3300 251.000 30.0 118.661 4.090 -999.990 -999.990 1.187 ..P WKT 2010 06 09 14 59 55 31.3200 -97.3300 251.000 122.0 117.677 4.480 -999.990 -999.990 1.177 ..P WKT 2010 06 09 15 04 55 31.3200 -97.3300 251.000 457.0 113.377 4.930 -999.990 -999.990 1.134 ..P WKT 2010 06 09 15 14 55 31.3200 -97.3300 251.000 30.0 118.835 5.770 -999.990 -999.990 1.188 ..P WKT 2010 06 09 15 19 55 31.3200 -97.3300 251.000 122.0 125.276 4.670 -999.990 -999.990 1.253 ..P WKT 2010 06 09 15 24 55 31.3200 -97.3300 251.000 457.0 123.976 5.060 -999.990 -999.990 1.240 ..P WKT 2010 06 09 15 29 55 31.3200 -97.3300 251.000 30.0 123.230 3.250 -999.990 -999.990 1.232 ..P WKT 2010 06 09 15 34 55 31.3200 -97.3300 251.000 122.0 124.143 2.950 -999.990 -999.990 1.241 ..P WKT 2010 06 09 15 39 55 31.3200 -97.3300 251.000 457.0 122.014 3.340 -999.990 -999.990 1.220 ..P WKT 2010 06 09 15 49 55 31.3200 -97.3300 251.000 30.0 124.333 2.800 -999.990 -999.990 1.243 ..P WKT 2010 06 09 15 54 55 31.3200 -97.3300 251.000 122.0 124.080 2.870 -999.990 -999.990 1.241 ..P WKT 2010 06 09 15 59 55 31.3200 -97.3300 251.000 457.0 116.223 5.010 -999.990 -999.990 1.162 ..P WKT 2010 06 09 16 04 55 31.3200 -97.3300 251.000 30.0 151.369 5.520 -999.990 -999.990 1.514 ..P WKT 2010 06 09 16 09 55 31.3200 -97.3300 251.000 122.0 117.377 3.730 -999.990 -999.990 1.174 ..P WKT 2010 06 09 16 14 55 31.3200 -97.3300 251.000 457.0 120.442 3.640 -999.990 -999.990 1.204 ..P WKT 2010 06 09 16 24 55 31.3200 -97.3300 251.000 30.0 115.512 4.270 -999.990 -999.990 1.155 ..P WKT 2010 06 09 16 29 55 31.3200 -97.3300 251.000 122.0 112.907 4.680 -999.990 -999.990 1.129 ..P WKT 2010 06 09 16 34 55 31.3200 -97.3300 251.000 457.0 115.835 5.750 -999.990 -999.990 1.158 ..P WKT 2010 06 09 16 39 55 31.3200 -97.3300 251.000 30.0 117.380 3.870 -999.990 -999.990 1.174 ..P WKT 2010 06 09 16 44 55 31.3200 -97.3300 251.000 122.0 120.170 3.640 -999.990 -999.990 1.202 ..P WKT 2010 06 09 16 49 55 31.3200 -97.3300 251.000 457.0 118.949 5.160 -999.990 -999.990 1.189 ..P WKT 2010 06 09 17 04 55 31.3200 -97.3300 251.000 30.0 114.622 3.680 -999.990 -999.990 1.146 ..P WKT 2010 06 09 17 09 55 31.3200 -97.3300 251.000 122.0 123.930 3.860 -999.990 -999.990 1.239 ..P WKT 2010 06 09 17 14 55 31.3200 -97.3300 251.000 457.0 123.830 4.070 -999.990 -999.990 1.238 ..P WKT 2010 06 09 17 19 55 31.3200 -97.3300 251.000 30.0 114.876 3.150 -999.990 -999.990 1.149 ..P WKT 2010 06 09 17 24 55 31.3200 -97.3300 251.000 122.0 116.713 4.000 -999.990 -999.990 1.167 ..P WKT 2010 06 09 17 29 55 31.3200 -97.3300 251.000 457.0 117.582 4.000 -999.990 -999.990 1.176 ..P WKT 2010 06 09 17 39 55 31.3200 -97.3300 251.000 30.0 111.437 5.010 -999.990 -999.990 1.114 ..P WKT 2010 06 09 17 44 55 31.3200 -97.3300 251.000 122.0 120.198 4.830 -999.990 -999.990 1.202 ..P WKT 2010 06 09 17 49 55 31.3200 -97.3300 251.000 457.0 119.550 3.710 -999.990 -999.990 1.196 ..P WKT 2010 06 09 17 54 55 31.3200 -97.3300 251.000 30.0 113.504 3.560 -999.990 -999.990 1.135 ..P WKT 2010 06 09 17 59 55 31.3200 -97.3300 251.000 122.0 115.485 3.720 -999.990 -999.990 1.155 ..P WKT 2010 06 09 18 04 55 31.3200 -97.3300 251.000 457.0 119.543 4.980 -999.990 -999.990 1.195 ..P WKT 2010 06 09 18 14 55 31.3200 -97.3300 251.000 30.0 116.090 5.950 -999.990 -999.990 1.161 ..P WKT 2010 06 09 18 19 55 31.3200 -97.3300 251.000 122.0 121.038 3.780 -999.990 -999.990 1.210 ..P WKT 2010 06 09 18 24 55 31.3200 -97.3300 251.000 457.0 120.448 4.440 -999.990 -999.990 1.204 ..P WKT 2010 06 09 18 29 55 31.3200 -97.3300 251.000 30.0 120.413 3.450 -999.990 -999.990 1.204 ..P WKT 2010 06 09 18 34 55 31.3200 -97.3300 251.000 122.0 119.823 3.570 -999.990 -999.990 1.198 ..P WKT 2010 06 09 18 39 55 31.3200 -97.3300 251.000 457.0 126.986 4.940 -999.990 -999.990 1.270 ..P WKT 2010 06 09 18 49 55 31.3200 -97.3300 251.000 30.0 117.343 3.740 -999.990 -999.990 1.173 ..P WKT 2010 06 09 18 54 55 31.3200 -97.3300 251.000 122.0 117.980 3.790 -999.990 -999.990 1.180 ..P WKT 2010 06 09 18 59 55 31.3200 -97.3300 251.000 457.0 123.878 3.130 -999.990 -999.990 1.239 ..P WKT 2010 06 09 19 04 55 31.3200 -97.3300 251.000 30.0 116.208 3.500 -999.990 -999.990 1.162 ..P WKT 2010 06 09 19 09 55 31.3200 -97.3300 251.000 122.0 124.044 3.760 -999.990 -999.990 1.240 ..P WKT 2010 06 09 19 14 55 31.3200 -97.3300 251.000 457.0 129.944 3.380 -999.990 -999.990 1.299 ..P WKT 2010 06 09 19 24 55 31.3200 -97.3300 251.000 30.0 122.712 3.430 -999.990 -999.990 1.227 ..P WKT 2010 06 09 19 29 55 31.3200 -97.3300 251.000 122.0 121.766 4.870 -999.990 -999.990 1.218 ..P WKT 2010 06 09 19 34 55 31.3200 -97.3300 251.000 457.0 133.563 3.950 -999.990 -999.990 1.336 ..P WKT 2010 06 09 19 39 55 31.3200 -97.3300 251.000 30.0 120.983 4.760 -999.990 -999.990 1.210 ..P WKT 2010 06 09 19 44 55 31.3200 -97.3300 251.000 122.0 116.991 3.430 -999.990 -999.990 1.170 ..P WKT 2010 06 09 19 49 55 31.3200 -97.3300 251.000 457.0 119.369 3.640 -999.990 -999.990 1.194 ..P WKT 2010 06 09 19 59 55 31.3200 -97.3300 251.000 30.0 114.370 3.970 -999.990 -999.990 1.144 ..P WKT 2010 06 09 20 04 55 31.3200 -97.3300 251.000 122.0 120.429 3.090 -999.990 -999.990 1.204 ..P WKT 2010 06 09 20 09 55 31.3200 -97.3300 251.000 457.0 118.039 3.390 -999.990 -999.990 1.180 ..P WKT 2010 06 09 20 14 55 31.3200 -97.3300 251.000 30.0 114.817 3.780 -999.990 -999.990 1.148 ..P WKT 2010 06 09 20 19 55 31.3200 -97.3300 251.000 122.0 121.708 3.060 -999.990 -999.990 1.217 ..P WKT 2010 06 09 20 24 55 31.3200 -97.3300 251.000 457.0 124.721 2.880 -999.990 -999.990 1.247 ..P WKT 2010 06 09 20 34 55 31.3200 -97.3300 251.000 30.0 119.661 3.430 -999.990 -999.990 1.197 ..P WKT 2010 06 09 20 39 55 31.3200 -97.3300 251.000 122.0 117.548 4.260 -999.990 -999.990 1.175 ..P WKT 2010 06 09 20 44 55 31.3200 -97.3300 251.000 457.0 129.707 5.010 -999.990 -999.990 1.297 ..P WKT 2010 06 09 20 49 55 31.3200 -97.3300 251.000 30.0 122.604 5.430 -999.990 -999.990 1.226 ..P WKT 2010 06 09 20 54 55 31.3200 -97.3300 251.000 122.0 125.756 4.580 -999.990 -999.990 1.258 ..P WKT 2010 06 09 20 59 55 31.3200 -97.3300 251.000 457.0 129.047 3.890 -999.990 -999.990 1.290 ..P WKT 2010 06 09 21 09 55 31.3200 -97.3300 251.000 30.0 126.382 3.480 -999.990 -999.990 1.264 ..P WKT 2010 06 09 21 14 55 31.3200 -97.3300 251.000 122.0 130.960 4.750 -999.990 -999.990 1.310 ..P WKT 2010 06 09 21 19 55 31.3200 -97.3300 251.000 457.0 129.718 5.480 -999.990 -999.990 1.297 ..P WKT 2010 06 09 21 24 55 31.3200 -97.3300 251.000 30.0 121.544 5.800 -999.990 -999.990 1.215 ..P WKT 2010 06 09 21 29 55 31.3200 -97.3300 251.000 122.0 130.696 5.870 -999.990 -999.990 1.307 ..P WKT 2010 06 09 21 34 55 31.3200 -97.3300 251.000 457.0 118.086 4.160 -999.990 -999.990 1.181 ..P WKT 2010 06 09 21 44 55 31.3200 -97.3300 251.000 30.0 121.540 3.890 -999.990 -999.990 1.215 ..P WKT 2010 06 09 21 49 55 31.3200 -97.3300 251.000 122.0 126.238 5.330 -999.990 -999.990 1.262 ..P WKT 2010 06 09 21 54 55 31.3200 -97.3300 251.000 457.0 114.715 6.310 -999.990 -999.990 1.147 ..P WKT 2010 06 09 21 59 55 31.3200 -97.3300 251.000 30.0 117.194 4.700 -999.990 -999.990 1.172 ..P WKT 2010 06 09 22 04 55 31.3200 -97.3300 251.000 122.0 124.943 5.160 -999.990 -999.990 1.249 ..P WKT 2010 06 09 22 09 55 31.3200 -97.3300 251.000 457.0 111.894 4.710 -999.990 -999.990 1.119 ..P WKT 2010 06 09 22 19 55 31.3200 -97.3300 251.000 30.0 134.346 4.330 -999.990 -999.990 1.343 ..P WKT 2010 06 09 22 24 55 31.3200 -97.3300 251.000 122.0 130.745 6.510 -999.990 -999.990 1.307 ..P WKT 2010 06 09 22 29 55 31.3200 -97.3300 251.000 457.0 110.779 5.380 -999.990 -999.990 1.108 ..P WKT 2010 06 09 22 34 55 31.3200 -97.3300 251.000 30.0 127.980 4.580 -999.990 -999.990 1.280 ..P WKT 2010 06 09 22 39 55 31.3200 -97.3300 251.000 122.0 129.371 4.180 -999.990 -999.990 1.294 ..P WKT 2010 06 09 22 44 55 31.3200 -97.3300 251.000 457.0 117.725 4.170 -999.990 -999.990 1.177 ..P WKT 2010 06 09 22 54 55 31.3200 -97.3300 251.000 30.0 124.708 3.050 -999.990 -999.990 1.247 ..P WKT 2010 06 09 22 59 55 31.3200 -97.3300 251.000 122.0 123.919 3.750 -999.990 -999.990 1.239 ..P WKT 2010 06 09 23 04 55 31.3200 -97.3300 251.000 457.0 119.524 3.790 -999.990 -999.990 1.195 ..P WKT 2010 06 09 23 09 55 31.3200 -97.3300 251.000 30.0 133.718 4.120 -999.990 -999.990 1.337 ..P WKT 2010 06 09 23 14 55 31.3200 -97.3300 251.000 122.0 130.155 4.670 -999.990 -999.990 1.302 ..P WKT 2010 06 09 23 19 55 31.3200 -97.3300 251.000 457.0 114.938 4.080 -999.990 -999.990 1.149 ..P WKT 2010 06 09 23 29 55 31.3200 -97.3300 251.000 30.0 125.686 3.440 -999.990 -999.990 1.257 ..P WKT 2010 06 09 23 34 55 31.3200 -97.3300 251.000 122.0 126.957 3.900 -999.990 -999.990 1.270 ..P WKT 2010 06 09 23 39 55 31.3200 -97.3300 251.000 457.0 117.681 3.770 -999.990 -999.990 1.177 ..P WKT 2010 06 09 23 44 55 31.3200 -97.3300 251.000 30.0 123.114 6.310 -999.990 -999.990 1.231 ..P WKT 2010 06 09 23 49 55 31.3200 -97.3300 251.000 122.0 123.275 5.550 -999.990 -999.990 1.233 ..P WKT 2010 06 10 00 09 55 31.3200 -97.3300 251.000 457.0 122.510 3.930 -999.990 -999.990 1.225 ..P WKT 2010 06 10 00 10 25 31.3200 -97.3300 251.000 457.0 119.776 4.080 -999.990 -999.990 1.198 ..P WKT 2010 06 10 00 10 55 31.3200 -97.3300 251.000 457.0 119.402 4.410 -999.990 -999.990 1.194 ..P WKT 2010 06 10 00 11 25 31.3200 -97.3300 251.000 457.0 114.310 4.140 -999.990 -999.990 1.143 ..P WKT 2010 06 10 00 11 55 31.3200 -97.3300 251.000 457.0 117.127 4.690 -999.990 -999.990 1.171 ..P WKT 2010 06 10 00 12 25 31.3200 -97.3300 251.000 457.0 120.498 3.840 -999.990 -999.990 1.205 ..P WKT 2010 06 10 00 12 55 31.3200 -97.3300 251.000 457.0 117.071 4.750 -999.990 -999.990 1.171 ..P WKT 2010 06 10 00 13 25 31.3200 -97.3300 251.000 457.0 117.529 5.210 -999.990 -999.990 1.175 ..P WKT 2010 06 10 00 13 55 31.3200 -97.3300 251.000 457.0 120.207 4.960 -999.990 -999.990 1.202 ..P WKT 2010 06 10 00 14 25 31.3200 -97.3300 251.000 457.0 116.780 4.370 -999.990 -999.990 1.168 ..P WKT 2010 06 10 00 14 55 31.3200 -97.3300 251.000 457.0 115.157 4.370 -999.990 -999.990 1.152 ..P WKT 2010 06 10 00 19 55 31.3200 -97.3300 251.000 30.0 127.922 5.130 -999.990 -999.990 1.279 ..P WKT 2010 06 10 00 24 55 31.3200 -97.3300 251.000 122.0 123.622 6.410 -999.990 -999.990 1.236 ..P WKT 2010 06 10 00 29 55 31.3200 -97.3300 251.000 457.0 117.935 5.650 -999.990 -999.990 1.179 ..P WKT 2010 06 10 00 34 55 31.3200 -97.3300 251.000 30.0 122.514 3.820 -999.990 -999.990 1.225 ..P WKT 2010 06 10 00 39 55 31.3200 -97.3300 251.000 122.0 125.704 4.150 -999.990 -999.990 1.257 ..P WKT 2010 06 10 00 44 55 31.3200 -97.3300 251.000 457.0 123.625 4.080 -999.990 -999.990 1.236 ..P WKT 2010 06 10 00 54 55 31.3200 -97.3300 251.000 30.0 114.237 4.470 -999.990 -999.990 1.142 ..P WKT 2010 06 10 00 59 55 31.3200 -97.3300 251.000 122.0 119.962 3.070 -999.990 -999.990 1.200 ..P WKT 2010 06 10 01 04 55 31.3200 -97.3300 251.000 457.0 112.933 5.140 -999.990 -999.990 1.129 ..P WKT 2010 06 10 01 09 55 31.3200 -97.3300 251.000 30.0 115.331 5.660 -999.990 -999.990 1.153 ..P WKT 2010 06 10 01 14 55 31.3200 -97.3300 251.000 122.0 115.372 5.110 -999.990 -999.990 1.154 ..P WKT 2010 06 10 01 19 55 31.3200 -97.3300 251.000 457.0 107.513 3.610 -999.990 -999.990 1.075 ..P WKT 2010 06 10 01 29 55 31.3200 -97.3300 251.000 30.0 119.216 4.660 -999.990 -999.990 1.192 ..P WKT 2010 06 10 01 34 55 31.3200 -97.3300 251.000 122.0 119.098 4.970 -999.990 -999.990 1.191 ..P WKT 2010 06 10 01 39 55 31.3200 -97.3300 251.000 457.0 114.824 5.640 -999.990 -999.990 1.148 ..P WKT 2010 06 10 01 44 55 31.3200 -97.3300 251.000 30.0 125.235 5.570 -999.990 -999.990 1.252 ..P WKT 2010 06 10 01 49 55 31.3200 -97.3300 251.000 122.0 119.715 4.950 -999.990 -999.990 1.197 ..P WKT 2010 06 10 01 54 55 31.3200 -97.3300 251.000 457.0 116.965 3.810 -999.990 -999.990 1.170 ..P WKT 2010 06 10 02 04 55 31.3200 -97.3300 251.000 30.0 122.765 5.060 -999.990 -999.990 1.228 ..P WKT 2010 06 10 02 09 55 31.3200 -97.3300 251.000 122.0 118.295 4.980 -999.990 -999.990 1.183 ..P WKT 2010 06 10 02 14 55 31.3200 -97.3300 251.000 457.0 111.609 5.730 -999.990 -999.990 1.116 ..P WKT 2010 06 10 02 19 55 31.3200 -97.3300 251.000 30.0 119.048 4.680 -999.990 -999.990 1.190 ..P WKT 2010 06 10 02 24 55 31.3200 -97.3300 251.000 122.0 121.778 4.210 -999.990 -999.990 1.218 ..P WKT 2010 06 10 02 29 55 31.3200 -97.3300 251.000 457.0 112.326 2.960 -999.990 -999.990 1.123 ..P WKT 2010 06 10 02 39 55 31.3200 -97.3300 251.000 30.0 116.205 3.860 -999.990 -999.990 1.162 ..P WKT 2010 06 10 02 44 55 31.3200 -97.3300 251.000 122.0 108.773 3.450 -999.990 -999.990 1.088 ..P WKT 2010 06 10 02 49 55 31.3200 -97.3300 251.000 457.0 108.537 3.770 -999.990 -999.990 1.085 ..P WKT 2010 06 10 02 54 55 31.3200 -97.3300 251.000 30.0 116.881 3.470 -999.990 -999.990 1.169 ..P WKT 2010 06 10 02 59 55 31.3200 -97.3300 251.000 122.0 115.538 2.830 -999.990 -999.990 1.155 ..P WKT 2010 06 10 03 04 55 31.3200 -97.3300 251.000 457.0 107.554 2.620 -999.990 -999.990 1.076 ..P WKT 2010 06 10 03 14 55 31.3200 -97.3300 251.000 30.0 120.858 2.610 -999.990 -999.990 1.209 ..P WKT 2010 06 10 03 19 55 31.3200 -97.3300 251.000 122.0 125.819 2.580 -999.990 -999.990 1.258 ..P WKT 2010 06 10 03 24 55 31.3200 -97.3300 251.000 457.0 113.352 2.970 -999.990 -999.990 1.134 ..P WKT 2010 06 10 03 29 55 31.3200 -97.3300 251.000 30.0 124.397 3.170 -999.990 -999.990 1.244 ..P WKT 2010 06 10 03 34 55 31.3200 -97.3300 251.000 122.0 120.783 2.830 -999.990 -999.990 1.208 ..P WKT 2010 06 10 03 39 55 31.3200 -97.3300 251.000 457.0 103.618 5.150 -999.990 -999.990 1.036 ..P WKT 2010 06 10 03 49 55 31.3200 -97.3300 251.000 30.0 118.811 2.910 -999.990 -999.990 1.188 ..P WKT 2010 06 10 03 54 55 31.3200 -97.3300 251.000 122.0 117.983 3.680 -999.990 -999.990 1.180 ..P WKT 2010 06 10 03 59 55 31.3200 -97.3300 251.000 457.0 99.323 3.730 -999.990 -999.990 0.993 ..P WKT 2010 06 10 04 04 55 31.3200 -97.3300 251.000 30.0 117.985 3.360 -999.990 -999.990 1.180 ..P WKT 2010 06 10 04 09 55 31.3200 -97.3300 251.000 122.0 119.644 4.840 -999.990 -999.990 1.196 ..P WKT 2010 06 10 04 14 55 31.3200 -97.3300 251.000 457.0 103.891 3.400 -999.990 -999.990 1.039 ..P WKT 2010 06 10 04 24 55 31.3200 -97.3300 251.000 30.0 118.364 3.550 -999.990 -999.990 1.184 ..P WKT 2010 06 10 04 29 55 31.3200 -97.3300 251.000 122.0 130.069 3.020 -999.990 -999.990 1.301 ..P WKT 2010 06 10 04 34 55 31.3200 -97.3300 251.000 457.0 110.966 3.520 -999.990 -999.990 1.110 ..P WKT 2010 06 10 04 39 55 31.3200 -97.3300 251.000 30.0 126.122 3.050 -999.990 -999.990 1.261 ..P WKT 2010 06 10 04 44 55 31.3200 -97.3300 251.000 122.0 133.956 2.870 -999.990 -999.990 1.340 ..P WKT 2010 06 10 04 49 55 31.3200 -97.3300 251.000 457.0 105.604 3.010 -999.990 -999.990 1.056 ..P WKT 2010 06 10 05 04 55 31.3200 -97.3300 251.000 30.0 124.245 2.760 -999.990 -999.990 1.242 ..P WKT 2010 06 10 05 09 55 31.3200 -97.3300 251.000 122.0 124.264 2.750 -999.990 -999.990 1.243 ..P WKT 2010 06 10 05 14 55 31.3200 -97.3300 251.000 457.0 101.365 2.480 -999.990 -999.990 1.014 ..P WKT 2010 06 10 05 19 55 31.3200 -97.3300 251.000 30.0 127.061 2.650 -999.990 -999.990 1.271 ..P WKT 2010 06 10 05 24 55 31.3200 -97.3300 251.000 122.0 127.492 2.620 -999.990 -999.990 1.275 ..P WKT 2010 06 10 05 29 55 31.3200 -97.3300 251.000 457.0 108.187 3.320 -999.990 -999.990 1.082 ..P WKT 2010 06 10 05 39 55 31.3200 -97.3300 251.000 30.0 131.589 4.100 -999.990 -999.990 1.316 ..P WKT 2010 06 10 05 44 55 31.3200 -97.3300 251.000 122.0 130.681 3.000 -999.990 -999.990 1.307 ..P WKT 2010 06 10 05 49 55 31.3200 -97.3300 251.000 457.0 104.664 3.600 -999.990 -999.990 1.047 ..P WKT 2010 06 10 05 54 55 31.3200 -97.3300 251.000 30.0 128.731 2.580 -999.990 -999.990 1.287 ..P WKT 2010 06 10 05 59 55 31.3200 -97.3300 251.000 122.0 130.722 3.150 -999.990 -999.990 1.307 ..P WKT 2010 06 10 06 04 55 31.3200 -97.3300 251.000 457.0 100.987 2.900 -999.990 -999.990 1.010 ..P WKT 2010 06 10 06 14 55 31.3200 -97.3300 251.000 30.0 132.259 3.800 -999.990 -999.990 1.323 ..P WKT 2010 06 10 06 19 55 31.3200 -97.3300 251.000 122.0 134.504 2.670 -999.990 -999.990 1.345 ..P WKT 2010 06 10 06 24 55 31.3200 -97.3300 251.000 457.0 107.241 4.350 -999.990 -999.990 1.072 ..P WKT 2010 06 10 06 29 55 31.3200 -97.3300 251.000 30.0 130.998 3.190 -999.990 -999.990 1.310 ..P WKT 2010 06 10 06 34 55 31.3200 -97.3300 251.000 122.0 127.729 2.550 -999.990 -999.990 1.277 ..P WKT 2010 06 10 06 39 55 31.3200 -97.3300 251.000 457.0 107.917 2.480 -999.990 -999.990 1.079 ..P WKT 2010 06 10 06 49 55 31.3200 -97.3300 251.000 30.0 131.983 2.890 -999.990 -999.990 1.320 ..P WKT 2010 06 10 06 54 55 31.3200 -97.3300 251.000 122.0 121.272 2.430 -999.990 -999.990 1.213 ..P WKT 2010 06 10 06 59 55 31.3200 -97.3300 251.000 457.0 105.051 2.980 -999.990 -999.990 1.051 ..P WKT 2010 06 10 07 04 55 31.3200 -97.3300 251.000 30.0 113.636 2.580 -999.990 -999.990 1.136 ..P WKT 2010 06 10 07 09 55 31.3200 -97.3300 251.000 122.0 112.575 2.470 -999.990 -999.990 1.126 ..P WKT 2010 06 10 07 14 55 31.3200 -97.3300 251.000 457.0 95.532 2.610 -999.990 -999.990 0.955 ..P WKT 2010 06 10 07 24 55 31.3200 -97.3300 251.000 30.0 122.045 2.260 -999.990 -999.990 1.220 ..P WKT 2010 06 10 07 29 55 31.3200 -97.3300 251.000 122.0 115.729 2.390 -999.990 -999.990 1.157 ..P WKT 2010 06 10 07 34 55 31.3200 -97.3300 251.000 457.0 98.397 2.750 -999.990 -999.990 0.984 ..P WKT 2010 06 10 07 39 55 31.3200 -97.3300 251.000 30.0 119.903 2.910 -999.990 -999.990 1.199 ..P WKT 2010 06 10 07 44 55 31.3200 -97.3300 251.000 122.0 115.655 3.290 -999.990 -999.990 1.157 ..P WKT 2010 06 10 07 49 55 31.3200 -97.3300 251.000 457.0 105.624 3.600 -999.990 -999.990 1.056 ..P WKT 2010 06 10 07 59 55 31.3200 -97.3300 251.000 30.0 112.984 3.810 -999.990 -999.990 1.130 ..P WKT 2010 06 10 08 04 55 31.3200 -97.3300 251.000 122.0 113.851 3.290 -999.990 -999.990 1.139 ..P WKT 2010 06 10 08 09 55 31.3200 -97.3300 251.000 457.0 96.961 3.380 -999.990 -999.990 0.970 ..P WKT 2010 06 10 08 14 55 31.3200 -97.3300 251.000 30.0 108.565 3.060 -999.990 -999.990 1.086 ..P WKT 2010 06 10 08 19 55 31.3200 -97.3300 251.000 122.0 114.936 3.040 -999.990 -999.990 1.149 ..P WKT 2010 06 10 08 24 55 31.3200 -97.3300 251.000 457.0 103.830 3.440 -999.990 -999.990 1.038 ..P WKT 2010 06 10 08 34 55 31.3200 -97.3300 251.000 30.0 108.317 2.700 -999.990 -999.990 1.083 ..P WKT 2010 06 10 08 39 55 31.3200 -97.3300 251.000 122.0 115.237 2.800 -999.990 -999.990 1.152 ..P WKT 2010 06 10 08 44 55 31.3200 -97.3300 251.000 457.0 103.171 3.430 -999.990 -999.990 1.032 ..P WKT 2010 06 10 08 49 55 31.3200 -97.3300 251.000 30.0 112.430 3.970 -999.990 -999.990 1.124 ..P WKT 2010 06 10 08 54 55 31.3200 -97.3300 251.000 122.0 104.356 3.120 -999.990 -999.990 1.044 ..P WKT 2010 06 10 08 59 55 31.3200 -97.3300 251.000 457.0 103.847 3.440 -999.990 -999.990 1.038 ..P WKT 2010 06 10 09 09 55 31.3200 -97.3300 251.000 30.0 106.563 3.940 -999.990 -999.990 1.066 ..P WKT 2010 06 10 09 14 55 31.3200 -97.3300 251.000 122.0 110.473 3.250 -999.990 -999.990 1.105 ..P WKT 2010 06 10 09 19 55 31.3200 -97.3300 251.000 457.0 104.759 4.210 -999.990 -999.990 1.048 ..P WKT 2010 06 10 09 24 55 31.3200 -97.3300 251.000 30.0 109.495 3.590 -999.990 -999.990 1.095 ..P WKT 2010 06 10 09 29 55 31.3200 -97.3300 251.000 122.0 111.068 3.750 -999.990 -999.990 1.111 ..P WKT 2010 06 10 09 34 55 31.3200 -97.3300 251.000 457.0 106.455 2.290 -999.990 -999.990 1.065 ..P WKT 2010 06 10 09 44 55 31.3200 -97.3300 251.000 30.0 113.724 3.470 -999.990 -999.990 1.137 ..P WKT 2010 06 10 09 49 55 31.3200 -97.3300 251.000 122.0 115.021 3.060 -999.990 -999.990 1.150 ..P WKT 2010 06 10 09 54 55 31.3200 -97.3300 251.000 457.0 109.448 4.240 -999.990 -999.990 1.094 ..P WKT 2010 06 10 09 59 55 31.3200 -97.3300 251.000 30.0 104.699 3.440 -999.990 -999.990 1.047 ..P WKT 2010 06 10 10 04 55 31.3200 -97.3300 251.000 122.0 105.723 2.440 -999.990 -999.990 1.057 ..P WKT 2010 06 10 10 09 55 31.3200 -97.3300 251.000 457.0 106.745 3.070 -999.990 -999.990 1.067 ..P WKT 2010 06 10 10 19 55 31.3200 -97.3300 251.000 30.0 102.590 2.380 -999.990 -999.990 1.026 ..P WKT 2010 06 10 10 24 55 31.3200 -97.3300 251.000 122.0 112.520 2.480 -999.990 -999.990 1.125 ..P WKT 2010 06 10 10 29 55 31.3200 -97.3300 251.000 457.0 109.265 2.330 -999.990 -999.990 1.093 ..P WKT 2010 06 10 10 34 55 31.3200 -97.3300 251.000 30.0 108.482 2.570 -999.990 -999.990 1.085 ..P WKT 2010 06 10 10 39 55 31.3200 -97.3300 251.000 122.0 107.974 2.480 -999.990 -999.990 1.080 ..P WKT 2010 06 10 10 44 55 31.3200 -97.3300 251.000 457.0 109.938 2.970 -999.990 -999.990 1.099 ..P WKT 2010 06 10 10 54 55 31.3200 -97.3300 251.000 30.0 116.059 3.830 -999.990 -999.990 1.161 ..P WKT 2010 06 10 10 59 55 31.3200 -97.3300 251.000 122.0 105.668 2.880 -999.990 -999.990 1.057 ..P WKT 2010 06 10 11 04 55 31.3200 -97.3300 251.000 457.0 110.650 2.410 -999.990 -999.990 1.107 ..P WKT 2010 06 10 11 09 55 31.3200 -97.3300 251.000 30.0 109.593 5.530 -999.990 -999.990 1.096 ..P WKT 2010 06 10 11 14 55 31.3200 -97.3300 251.000 122.0 114.574 2.450 -999.990 -999.990 1.146 ..P WKT 2010 06 10 11 19 55 31.3200 -97.3300 251.000 457.0 115.987 2.330 -999.990 -999.990 1.160 ..P WKT 2010 06 10 11 29 55 31.3200 -97.3300 251.000 30.0 118.052 2.300 -999.990 -999.990 1.181 ..P WKT 2010 06 10 11 34 55 31.3200 -97.3300 251.000 122.0 121.723 2.200 -999.990 -999.990 1.217 ..P WKT 2010 06 10 11 39 55 31.3200 -97.3300 251.000 457.0 115.380 2.870 -999.990 -999.990 1.154 ..P WKT 2010 06 10 11 44 55 31.3200 -97.3300 251.000 30.0 116.033 3.920 -999.990 -999.990 1.160 ..P WKT 2010 06 10 11 49 55 31.3200 -97.3300 251.000 122.0 114.903 5.200 -999.990 -999.990 1.149 ..P WKT 2010 06 10 12 09 55 31.3200 -97.3300 251.000 457.0 128.616 2.640 -999.990 -999.990 1.286 ..P WKT 2010 06 10 12 10 25 31.3200 -97.3300 251.000 457.0 126.185 2.650 -999.990 -999.990 1.262 ..P WKT 2010 06 10 12 10 55 31.3200 -97.3300 251.000 457.0 130.200 2.580 -999.990 -999.990 1.302 ..P WKT 2010 06 10 12 11 25 31.3200 -97.3300 251.000 457.0 124.202 4.300 -999.990 -999.990 1.242 ..P WKT 2010 06 10 12 11 55 31.3200 -97.3300 251.000 457.0 127.669 3.260 -999.990 -999.990 1.277 ..P WKT 2010 06 10 12 12 25 31.3200 -97.3300 251.000 457.0 127.158 2.650 -999.990 -999.990 1.272 ..P WKT 2010 06 10 12 12 55 31.3200 -97.3300 251.000 457.0 123.766 2.800 -999.990 -999.990 1.238 ..P WKT 2010 06 10 12 13 25 31.3200 -97.3300 251.000 457.0 128.329 3.620 -999.990 -999.990 1.283 ..P WKT 2010 06 10 12 13 55 31.3200 -97.3300 251.000 457.0 126.995 4.020 -999.990 -999.990 1.270 ..P WKT 2010 06 10 12 14 25 31.3200 -97.3300 251.000 457.0 124.975 3.390 -999.990 -999.990 1.250 ..P WKT 2010 06 10 12 14 55 31.3200 -97.3300 251.000 457.0 126.521 3.320 -999.990 -999.990 1.265 ..P WKT 2010 06 10 12 19 55 31.3200 -97.3300 251.000 30.0 121.545 4.970 -999.990 -999.990 1.215 ..P WKT 2010 06 10 12 24 55 31.3200 -97.3300 251.000 122.0 126.445 4.490 -999.990 -999.990 1.264 ..P WKT 2010 06 10 12 29 55 31.3200 -97.3300 251.000 457.0 122.566 3.740 -999.990 -999.990 1.226 ..P WKT 2010 06 10 12 34 55 31.3200 -97.3300 251.000 30.0 120.607 2.990 -999.990 -999.990 1.206 ..P WKT 2010 06 10 12 39 55 31.3200 -97.3300 251.000 122.0 128.390 3.140 -999.990 -999.990 1.284 ..P WKT 2010 06 10 12 44 55 31.3200 -97.3300 251.000 457.0 127.804 2.640 -999.990 -999.990 1.278 ..P WKT 2010 06 10 12 54 55 31.3200 -97.3300 251.000 30.0 121.832 4.270 -999.990 -999.990 1.218 ..P WKT 2010 06 10 12 59 55 31.3200 -97.3300 251.000 122.0 123.036 3.530 -999.990 -999.990 1.230 ..P WKT 2010 06 10 13 04 55 31.3200 -97.3300 251.000 457.0 116.689 3.950 -999.990 -999.990 1.167 ..P WKT 2010 06 10 13 09 55 31.3200 -97.3300 251.000 30.0 114.596 3.300 -999.990 -999.990 1.146 ..P WKT 2010 06 10 13 14 55 31.3200 -97.3300 251.000 122.0 118.272 3.440 -999.990 -999.990 1.183 ..P WKT 2010 06 10 13 19 55 31.3200 -97.3300 251.000 457.0 117.965 3.150 -999.990 -999.990 1.180 ..P WKT 2010 06 10 13 29 55 31.3200 -97.3300 251.000 30.0 119.549 3.620 -999.990 -999.990 1.195 ..P WKT 2010 06 10 13 34 55 31.3200 -97.3300 251.000 122.0 125.149 3.890 -999.990 -999.990 1.251 ..P WKT 2010 06 10 13 39 55 31.3200 -97.3300 251.000 457.0 127.866 3.640 -999.990 -999.990 1.279 ..P WKT 2010 06 10 13 44 55 31.3200 -97.3300 251.000 30.0 123.987 4.360 -999.990 -999.990 1.240 ..P WKT 2010 06 10 13 49 55 31.3200 -97.3300 251.000 122.0 123.955 3.750 -999.990 -999.990 1.240 ..P WKT 2010 06 10 13 54 55 31.3200 -97.3300 251.000 457.0 122.000 3.840 -999.990 -999.990 1.220 ..P WKT 2010 06 10 14 04 55 31.3200 -97.3300 251.000 30.0 118.087 4.050 -999.990 -999.990 1.181 ..P WKT 2010 06 10 14 09 55 31.3200 -97.3300 251.000 122.0 123.004 4.030 -999.990 -999.990 1.230 ..P WKT 2010 06 10 14 14 55 31.3200 -97.3300 251.000 457.0 120.223 4.530 -999.990 -999.990 1.202 ..P WKT 2010 06 10 14 19 55 31.3200 -97.3300 251.000 30.0 117.715 4.690 -999.990 -999.990 1.177 ..P WKT 2010 06 10 14 24 55 31.3200 -97.3300 251.000 122.0 123.459 4.620 -999.990 -999.990 1.235 ..P WKT 2010 06 10 14 29 55 31.3200 -97.3300 251.000 457.0 117.101 4.920 -999.990 -999.990 1.171 ..P WKT 2010 06 10 14 39 55 31.3200 -97.3300 251.000 30.0 124.661 5.090 -999.990 -999.990 1.247 ..P WKT 2010 06 10 14 44 55 31.3200 -97.3300 251.000 122.0 128.128 3.960 -999.990 -999.990 1.281 ..P WKT 2010 06 10 14 49 55 31.3200 -97.3300 251.000 457.0 120.313 3.350 -999.990 -999.990 1.203 ..P WKT 2010 06 10 14 54 55 31.3200 -97.3300 251.000 30.0 120.202 3.000 -999.990 -999.990 1.202 ..P WKT 2010 06 10 14 59 55 31.3200 -97.3300 251.000 122.0 123.945 2.760 -999.990 -999.990 1.239 ..P WKT 2010 06 10 15 04 55 31.3200 -97.3300 251.000 457.0 124.661 3.070 -999.990 -999.990 1.247 ..P WKT 2010 06 10 15 14 55 31.3200 -97.3300 251.000 30.0 117.833 2.060 -999.990 -999.990 1.178 ..P WKT 2010 06 10 15 19 55 31.3200 -97.3300 251.000 122.0 127.633 3.130 -999.990 -999.990 1.276 ..P WKT 2010 06 10 15 24 55 31.3200 -97.3300 251.000 457.0 124.494 3.110 -999.990 -999.990 1.245 ..P WKT 2010 06 10 15 29 55 31.3200 -97.3300 251.000 30.0 122.181 4.010 -999.990 -999.990 1.222 ..P WKT 2010 06 10 15 34 55 31.3200 -97.3300 251.000 122.0 127.854 3.430 -999.990 -999.990 1.279 ..P WKT 2010 06 10 15 39 55 31.3200 -97.3300 251.000 457.0 115.900 3.320 -999.990 -999.990 1.159 ..P WKT 2010 06 10 15 49 55 31.3200 -97.3300 251.000 30.0 126.520 2.580 -999.990 -999.990 1.265 ..P WKT 2010 06 10 15 54 55 31.3200 -97.3300 251.000 122.0 124.993 3.570 -999.990 -999.990 1.250 ..P WKT 2010 06 10 15 59 55 31.3200 -97.3300 251.000 457.0 123.329 4.860 -999.990 -999.990 1.233 ..P WKT 2010 06 10 16 04 55 31.3200 -97.3300 251.000 30.0 131.584 4.410 -999.990 -999.990 1.316 ..P WKT 2010 06 10 16 09 55 31.3200 -97.3300 251.000 122.0 133.777 3.550 -999.990 -999.990 1.338 ..P WKT 2010 06 10 16 14 55 31.3200 -97.3300 251.000 457.0 124.533 3.820 -999.990 -999.990 1.245 ..P WKT 2010 06 10 16 24 55 31.3200 -97.3300 251.000 30.0 138.943 4.230 -999.990 -999.990 1.389 ..P WKT 2010 06 10 16 29 55 31.3200 -97.3300 251.000 122.0 132.413 3.800 -999.990 -999.990 1.324 ..P WKT 2010 06 10 16 34 55 31.3200 -97.3300 251.000 457.0 129.468 4.140 -999.990 -999.990 1.295 ..P WKT 2010 06 10 16 39 55 31.3200 -97.3300 251.000 30.0 130.383 4.430 -999.990 -999.990 1.304 ..P WKT 2010 06 10 16 44 55 31.3200 -97.3300 251.000 122.0 132.675 2.700 -999.990 -999.990 1.327 ..P WKT 2010 06 10 16 49 55 31.3200 -97.3300 251.000 457.0 127.661 2.920 -999.990 -999.990 1.277 ..P WKT 2010 06 10 17 04 55 31.3200 -97.3300 251.000 30.0 139.179 2.600 -999.990 -999.990 1.392 ..P WKT 2010 06 10 17 09 55 31.3200 -97.3300 251.000 122.0 127.444 2.870 -999.990 -999.990 1.274 ..P WKT 2010 06 10 17 14 55 31.3200 -97.3300 251.000 457.0 130.470 3.530 -999.990 -999.990 1.305 ..P WKT 2010 06 10 17 19 55 31.3200 -97.3300 251.000 30.0 129.220 4.140 -999.990 -999.990 1.292 ..P WKT 2010 06 10 17 24 55 31.3200 -97.3300 251.000 122.0 127.140 3.310 -999.990 -999.990 1.271 ..P WKT 2010 06 10 17 29 55 31.3200 -97.3300 251.000 457.0 126.993 2.760 -999.990 -999.990 1.270 ..P WKT 2010 06 10 17 39 55 31.3200 -97.3300 251.000 30.0 129.793 2.630 -999.990 -999.990 1.298 ..P WKT 2010 06 10 17 44 55 31.3200 -97.3300 251.000 122.0 135.086 2.510 -999.990 -999.990 1.351 ..P WKT 2010 06 10 17 49 55 31.3200 -97.3300 251.000 457.0 132.373 2.710 -999.990 -999.990 1.324 ..P WKT 2010 06 10 17 54 55 31.3200 -97.3300 251.000 30.0 131.040 3.120 -999.990 -999.990 1.310 ..P WKT 2010 06 10 17 59 55 31.3200 -97.3300 251.000 122.0 136.612 3.710 -999.990 -999.990 1.366 ..P WKT 2010 06 10 18 04 55 31.3200 -97.3300 251.000 457.0 129.479 2.410 -999.990 -999.990 1.295 ..P WKT 2010 06 10 18 14 55 31.3200 -97.3300 251.000 30.0 136.087 2.580 -999.990 -999.990 1.361 ..P WKT 2010 06 10 18 19 55 31.3200 -97.3300 251.000 122.0 134.359 2.870 -999.990 -999.990 1.344 ..P WKT 2010 06 10 18 24 55 31.3200 -97.3300 251.000 457.0 137.881 3.250 -999.990 -999.990 1.379 ..P WKT 2010 06 10 18 29 55 31.3200 -97.3300 251.000 30.0 130.073 3.160 -999.990 -999.990 1.301 ..P WKT 2010 06 10 18 34 55 31.3200 -97.3300 251.000 122.0 137.465 2.530 -999.990 -999.990 1.375 ..P WKT 2010 06 10 18 39 55 31.3200 -97.3300 251.000 457.0 131.590 2.010 -999.990 -999.990 1.316 ..P WKT 2010 06 10 18 49 55 31.3200 -97.3300 251.000 30.0 132.278 3.890 -999.990 -999.990 1.323 ..P WKT 2010 06 10 18 54 55 31.3200 -97.3300 251.000 122.0 138.568 3.550 -999.990 -999.990 1.386 ..P WKT 2010 06 10 18 59 55 31.3200 -97.3300 251.000 457.0 132.690 3.920 -999.990 -999.990 1.327 ..P WKT 2010 06 10 19 04 55 31.3200 -97.3300 251.000 30.0 130.131 2.920 -999.990 -999.990 1.301 ..P WKT 2010 06 10 19 09 55 31.3200 -97.3300 251.000 122.0 130.060 2.960 -999.990 -999.990 1.301 ..P WKT 2010 06 10 19 14 55 31.3200 -97.3300 251.000 457.0 131.095 2.290 -999.990 -999.990 1.311 ..P WKT 2010 06 10 19 24 55 31.3200 -97.3300 251.000 30.0 131.745 3.070 -999.990 -999.990 1.317 ..P WKT 2010 06 10 19 29 55 31.3200 -97.3300 251.000 122.0 138.829 2.590 -999.990 -999.990 1.388 ..P WKT 2010 06 10 19 34 55 31.3200 -97.3300 251.000 457.0 136.782 3.170 -999.990 -999.990 1.368 ..P WKT 2010 06 10 19 39 55 31.3200 -97.3300 251.000 30.0 135.289 2.930 -999.990 -999.990 1.353 ..P WKT 2010 06 10 19 44 55 31.3200 -97.3300 251.000 122.0 136.701 2.970 -999.990 -999.990 1.367 ..P WKT 2010 06 10 19 49 55 31.3200 -97.3300 251.000 457.0 134.931 2.580 -999.990 -999.990 1.349 ..P WKT 2010 06 10 19 59 55 31.3200 -97.3300 251.000 30.0 136.294 2.970 -999.990 -999.990 1.363 ..P WKT 2010 06 10 20 04 55 31.3200 -97.3300 251.000 122.0 142.473 3.310 -999.990 -999.990 1.425 ..P WKT 2010 06 10 20 09 55 31.3200 -97.3300 251.000 457.0 133.839 3.940 -999.990 -999.990 1.338 ..P WKT 2010 06 10 20 14 55 31.3200 -97.3300 251.000 30.0 136.696 3.660 -999.990 -999.990 1.367 ..P WKT 2010 06 10 20 19 55 31.3200 -97.3300 251.000 122.0 151.188 4.830 -999.990 -999.990 1.512 ..P WKT 2010 06 10 20 24 55 31.3200 -97.3300 251.000 457.0 138.396 4.060 -999.990 -999.990 1.384 ..P WKT 2010 06 10 20 34 55 31.3200 -97.3300 251.000 30.0 142.352 3.970 -999.990 -999.990 1.424 ..P WKT 2010 06 10 20 39 55 31.3200 -97.3300 251.000 122.0 149.547 4.070 -999.990 -999.990 1.495 ..P WKT 2010 06 10 20 44 55 31.3200 -97.3300 251.000 457.0 139.422 4.500 -999.990 -999.990 1.394 ..P WKT 2010 06 10 20 49 55 31.3200 -97.3300 251.000 30.0 137.195 3.870 -999.990 -999.990 1.372 ..P WKT 2010 06 10 20 54 55 31.3200 -97.3300 251.000 122.0 151.597 4.490 -999.990 -999.990 1.516 ..P WKT 2010 06 10 20 59 55 31.3200 -97.3300 251.000 457.0 136.480 3.940 -999.990 -999.990 1.365 ..P WKT 2010 06 10 21 09 55 31.3200 -97.3300 251.000 30.0 129.290 3.640 -999.990 -999.990 1.293 ..P WKT 2010 06 10 21 14 55 31.3200 -97.3300 251.000 122.0 133.339 4.660 -999.990 -999.990 1.333 ..P WKT 2010 06 10 21 19 55 31.3200 -97.3300 251.000 457.0 131.010 4.170 -999.990 -999.990 1.310 ..P WKT 2010 06 10 21 24 55 31.3200 -97.3300 251.000 30.0 127.849 4.850 -999.990 -999.990 1.278 ..P WKT 2010 06 10 21 29 55 31.3200 -97.3300 251.000 122.0 137.585 4.050 -999.990 -999.990 1.376 ..P WKT 2010 06 10 21 34 55 31.3200 -97.3300 251.000 457.0 127.072 3.840 -999.990 -999.990 1.271 ..P WKT 2010 06 10 21 44 55 31.3200 -97.3300 251.000 30.0 133.846 2.840 -999.990 -999.990 1.338 ..P WKT 2010 06 10 21 49 55 31.3200 -97.3300 251.000 122.0 135.044 4.480 -999.990 -999.990 1.350 ..P WKT 2010 06 10 21 54 55 31.3200 -97.3300 251.000 457.0 129.860 4.880 -999.990 -999.990 1.299 ..P WKT 2010 06 10 21 59 55 31.3200 -97.3300 251.000 30.0 125.784 5.140 -999.990 -999.990 1.258 ..P WKT 2010 06 10 22 04 55 31.3200 -97.3300 251.000 122.0 138.362 4.300 -999.990 -999.990 1.384 ..P WKT 2010 06 10 22 09 55 31.3200 -97.3300 251.000 457.0 124.016 3.370 -999.990 -999.990 1.240 ..P WKT 2010 06 10 22 19 55 31.3200 -97.3300 251.000 30.0 126.015 3.420 -999.990 -999.990 1.260 ..P WKT 2010 06 10 22 24 55 31.3200 -97.3300 251.000 122.0 128.760 5.020 -999.990 -999.990 1.288 ..P WKT 2010 06 10 22 29 55 31.3200 -97.3300 251.000 457.0 127.617 5.200 -999.990 -999.990 1.276 ..P WKT 2010 06 10 22 34 55 31.3200 -97.3300 251.000 30.0 125.642 5.400 -999.990 -999.990 1.256 ..P WKT 2010 06 10 22 39 55 31.3200 -97.3300 251.000 122.0 130.609 5.400 -999.990 -999.990 1.306 ..P WKT 2010 06 10 22 44 55 31.3200 -97.3300 251.000 457.0 121.412 3.110 -999.990 -999.990 1.214 ..P WKT 2010 06 10 22 54 55 31.3200 -97.3300 251.000 30.0 128.928 3.580 -999.990 -999.990 1.289 ..P WKT 2010 06 10 22 59 55 31.3200 -97.3300 251.000 122.0 125.919 4.300 -999.990 -999.990 1.259 ..P WKT 2010 06 10 23 04 55 31.3200 -97.3300 251.000 457.0 111.794 5.740 -999.990 -999.990 1.118 ..P WKT 2010 06 10 23 09 55 31.3200 -97.3300 251.000 30.0 121.846 5.140 -999.990 -999.990 1.218 ..P WKT 2010 06 10 23 14 55 31.3200 -97.3300 251.000 122.0 129.120 2.760 -999.990 -999.990 1.291 ..P WKT 2010 06 10 23 19 55 31.3200 -97.3300 251.000 457.0 130.836 3.390 -999.990 -999.990 1.308 ..P WKT 2010 06 10 23 29 55 31.3200 -97.3300 251.000 30.0 133.481 3.600 -999.990 -999.990 1.335 ..P WKT 2010 06 10 23 34 55 31.3200 -97.3300 251.000 122.0 145.394 3.500 -999.990 -999.990 1.454 ..P WKT 2010 06 10 23 39 55 31.3200 -97.3300 251.000 457.0 134.506 3.190 -999.990 -999.990 1.345 ..P WKT 2010 06 10 23 44 55 31.3200 -97.3300 251.000 30.0 133.629 3.240 -999.990 -999.990 1.336 ..P WKT 2010 06 10 23 49 55 31.3200 -97.3300 251.000 122.0 131.500 3.300 -999.990 -999.990 1.315 ..P WKT 2010 06 11 00 09 55 31.3200 -97.3300 251.000 457.0 128.254 3.350 -999.990 -999.990 1.283 ..P WKT 2010 06 11 00 10 25 31.3200 -97.3300 251.000 457.0 123.178 3.660 -999.990 -999.990 1.232 ..P WKT 2010 06 11 00 10 55 31.3200 -97.3300 251.000 457.0 126.307 4.160 -999.990 -999.990 1.263 ..P WKT 2010 06 11 00 11 25 31.3200 -97.3300 251.000 457.0 128.325 3.390 -999.990 -999.990 1.283 ..P WKT 2010 06 11 00 11 55 31.3200 -97.3300 251.000 457.0 126.308 3.340 -999.990 -999.990 1.263 ..P WKT 2010 06 11 00 12 25 31.3200 -97.3300 251.000 457.0 125.265 3.590 -999.990 -999.990 1.253 ..P WKT 2010 06 11 00 12 55 31.3200 -97.3300 251.000 457.0 124.639 3.820 -999.990 -999.990 1.246 ..P WKT 2010 06 11 00 13 25 31.3200 -97.3300 251.000 457.0 127.491 3.540 -999.990 -999.990 1.275 ..P WKT 2010 06 11 00 13 55 31.3200 -97.3300 251.000 457.0 125.753 3.470 -999.990 -999.990 1.258 ..P WKT 2010 06 11 00 14 25 31.3200 -97.3300 251.000 457.0 125.823 3.520 -999.990 -999.990 1.258 ..P WKT 2010 06 11 00 14 55 31.3200 -97.3300 251.000 457.0 127.562 3.790 -999.990 -999.990 1.276 ..P WKT 2010 06 11 00 19 55 31.3200 -97.3300 251.000 30.0 125.896 3.700 -999.990 -999.990 1.259 ..P WKT 2010 06 11 00 24 55 31.3200 -97.3300 251.000 122.0 131.046 3.710 -999.990 -999.990 1.310 ..P WKT 2010 06 11 00 29 55 31.3200 -97.3300 251.000 457.0 123.677 4.330 -999.990 -999.990 1.237 ..P WKT 2010 06 11 00 34 55 31.3200 -97.3300 251.000 30.0 124.794 4.520 -999.990 -999.990 1.248 ..P WKT 2010 06 11 00 39 55 31.3200 -97.3300 251.000 122.0 120.485 3.600 -999.990 -999.990 1.205 ..P WKT 2010 06 11 00 44 55 31.3200 -97.3300 251.000 457.0 112.700 4.470 -999.990 -999.990 1.127 ..P WKT 2010 06 11 00 54 55 31.3200 -97.3300 251.000 30.0 121.478 3.580 -999.990 -999.990 1.215 ..P WKT 2010 06 11 00 59 55 31.3200 -97.3300 251.000 122.0 116.622 3.870 -999.990 -999.990 1.166 ..P WKT 2010 06 11 01 04 55 31.3200 -97.3300 251.000 457.0 117.191 4.610 -999.990 -999.990 1.172 ..P WKT 2010 06 11 01 09 55 31.3200 -97.3300 251.000 30.0 111.223 3.790 -999.990 -999.990 1.112 ..P WKT 2010 06 11 01 14 55 31.3200 -97.3300 251.000 122.0 118.745 5.100 -999.990 -999.990 1.187 ..P WKT 2010 06 11 01 19 55 31.3200 -97.3300 251.000 457.0 114.308 4.030 -999.990 -999.990 1.143 ..P WKT 2010 06 11 01 29 55 31.3200 -97.3300 251.000 30.0 111.512 4.030 -999.990 -999.990 1.115 ..P WKT 2010 06 11 01 34 55 31.3200 -97.3300 251.000 122.0 121.496 3.790 -999.990 -999.990 1.215 ..P WKT 2010 06 11 01 39 55 31.3200 -97.3300 251.000 457.0 114.516 3.240 -999.990 -999.990 1.145 ..P WKT 2010 06 11 01 44 55 31.3200 -97.3300 251.000 30.0 119.216 3.280 -999.990 -999.990 1.192 ..P WKT 2010 06 11 01 49 55 31.3200 -97.3300 251.000 122.0 123.082 2.810 -999.990 -999.990 1.231 ..P WKT 2010 06 11 01 54 55 31.3200 -97.3300 251.000 457.0 114.434 3.830 -999.990 -999.990 1.144 ..P WKT 2010 06 11 02 04 55 31.3200 -97.3300 251.000 30.0 112.552 3.050 -999.990 -999.990 1.126 ..P WKT 2010 06 11 02 09 55 31.3200 -97.3300 251.000 122.0 114.313 2.500 -999.990 -999.990 1.143 ..P WKT 2010 06 11 02 14 55 31.3200 -97.3300 251.000 457.0 111.068 3.100 -999.990 -999.990 1.111 ..P WKT 2010 06 11 02 19 55 31.3200 -97.3300 251.000 30.0 114.219 4.850 -999.990 -999.990 1.142 ..P WKT 2010 06 11 02 24 55 31.3200 -97.3300 251.000 122.0 110.696 3.520 -999.990 -999.990 1.107 ..P WKT 2010 06 11 02 29 55 31.3200 -97.3300 251.000 457.0 113.846 3.330 -999.990 -999.990 1.138 ..P WKT 2010 06 11 02 39 55 31.3200 -97.3300 251.000 30.0 109.582 3.640 -999.990 -999.990 1.096 ..P WKT 2010 06 11 02 44 55 31.3200 -97.3300 251.000 122.0 113.844 3.090 -999.990 -999.990 1.138 ..P WKT 2010 06 11 02 49 55 31.3200 -97.3300 251.000 457.0 112.823 3.920 -999.990 -999.990 1.128 ..P WKT 2010 06 11 02 54 55 31.3200 -97.3300 251.000 30.0 117.641 4.070 -999.990 -999.990 1.176 ..P WKT 2010 06 11 02 59 55 31.3200 -97.3300 251.000 122.0 111.062 3.710 -999.990 -999.990 1.111 ..P WKT 2010 06 11 03 04 55 31.3200 -97.3300 251.000 457.0 106.706 3.630 -999.990 -999.990 1.067 ..P WKT 2010 06 11 03 14 55 31.3200 -97.3300 251.000 30.0 111.695 4.020 -999.990 -999.990 1.117 ..P WKT 2010 06 11 03 19 55 31.3200 -97.3300 251.000 122.0 122.707 3.810 -999.990 -999.990 1.227 ..P WKT 2010 06 11 03 24 55 31.3200 -97.3300 251.000 457.0 116.485 4.020 -999.990 -999.990 1.165 ..P WKT 2010 06 11 03 29 55 31.3200 -97.3300 251.000 30.0 115.961 3.490 -999.990 -999.990 1.160 ..P WKT 2010 06 11 03 34 55 31.3200 -97.3300 251.000 122.0 112.797 3.750 -999.990 -999.990 1.128 ..P WKT 2010 06 11 03 39 55 31.3200 -97.3300 251.000 457.0 111.162 3.160 -999.990 -999.990 1.112 ..P WKT 2010 06 11 03 49 55 31.3200 -97.3300 251.000 30.0 109.599 4.100 -999.990 -999.990 1.096 ..P WKT 2010 06 11 03 54 55 31.3200 -97.3300 251.000 122.0 116.341 4.570 -999.990 -999.990 1.163 ..P WKT 2010 06 11 03 59 55 31.3200 -97.3300 251.000 457.0 106.686 3.340 -999.990 -999.990 1.067 ..P WKT 2010 06 11 04 04 55 31.3200 -97.3300 251.000 30.0 109.537 3.520 -999.990 -999.990 1.095 ..P WKT 2010 06 11 04 09 55 31.3200 -97.3300 251.000 122.0 112.944 3.500 -999.990 -999.990 1.129 ..P WKT 2010 06 11 04 14 55 31.3200 -97.3300 251.000 457.0 98.427 4.040 -999.990 -999.990 0.984 ..P WKT 2010 06 11 04 24 55 31.3200 -97.3300 251.000 30.0 103.892 4.090 -999.990 -999.990 1.039 ..P WKT 2010 06 11 04 29 55 31.3200 -97.3300 251.000 122.0 117.341 4.100 -999.990 -999.990 1.173 ..P WKT 2010 06 11 04 34 55 31.3200 -97.3300 251.000 457.0 98.141 3.840 -999.990 -999.990 0.981 ..P WKT 2010 06 11 04 39 55 31.3200 -97.3300 251.000 30.0 105.339 3.720 -999.990 -999.990 1.053 ..P WKT 2010 06 11 04 44 55 31.3200 -97.3300 251.000 122.0 113.091 4.300 -999.990 -999.990 1.131 ..P WKT 2010 06 11 04 49 55 31.3200 -97.3300 251.000 457.0 108.758 4.070 -999.990 -999.990 1.088 ..P WKT 2010 06 11 05 04 55 31.3200 -97.3300 251.000 30.0 109.093 3.890 -999.990 -999.990 1.091 ..P WKT 2010 06 11 05 09 55 31.3200 -97.3300 251.000 122.0 101.149 4.350 -999.990 -999.990 1.011 ..P WKT 2010 06 11 05 14 55 31.3200 -97.3300 251.000 457.0 96.121 4.300 -999.990 -999.990 0.961 ..P WKT 2010 06 11 05 19 55 31.3200 -97.3300 251.000 30.0 100.123 4.070 -999.990 -999.990 1.001 ..P WKT 2010 06 11 05 24 55 31.3200 -97.3300 251.000 122.0 108.013 3.820 -999.990 -999.990 1.080 ..P WKT 2010 06 11 05 29 55 31.3200 -97.3300 251.000 457.0 99.375 3.820 -999.990 -999.990 0.994 ..P WKT 2010 06 11 05 39 55 31.3200 -97.3300 251.000 30.0 104.440 5.510 -999.990 -999.990 1.044 ..P WKT 2010 06 11 05 44 55 31.3200 -97.3300 251.000 122.0 108.699 4.140 -999.990 -999.990 1.087 ..P WKT 2010 06 11 05 49 55 31.3200 -97.3300 251.000 457.0 94.903 4.190 -999.990 -999.990 0.949 ..P WKT 2010 06 11 05 54 55 31.3200 -97.3300 251.000 30.0 105.549 4.400 -999.990 -999.990 1.055 ..P WKT 2010 06 11 05 59 55 31.3200 -97.3300 251.000 122.0 104.531 4.460 -999.990 -999.990 1.045 ..P WKT 2010 06 11 06 04 55 31.3200 -97.3300 251.000 457.0 94.068 4.380 -999.990 -999.990 0.941 ..P WKT 2010 06 11 06 14 55 31.3200 -97.3300 251.000 30.0 101.871 4.340 -999.990 -999.990 1.019 ..P WKT 2010 06 11 06 19 55 31.3200 -97.3300 251.000 122.0 103.194 4.790 -999.990 -999.990 1.032 ..P WKT 2010 06 11 06 24 55 31.3200 -97.3300 251.000 457.0 99.239 3.950 -999.990 -999.990 0.992 ..P WKT 2010 06 11 06 29 55 31.3200 -97.3300 251.000 30.0 98.339 4.250 -999.990 -999.990 0.983 ..P WKT 2010 06 11 06 34 55 31.3200 -97.3300 251.000 122.0 109.381 3.990 -999.990 -999.990 1.094 ..P WKT 2010 06 11 06 39 55 31.3200 -97.3300 251.000 457.0 105.982 3.820 -999.990 -999.990 1.060 ..P WKT 2010 06 11 06 49 55 31.3200 -97.3300 251.000 30.0 109.181 4.800 -999.990 -999.990 1.092 ..P WKT 2010 06 11 06 54 55 31.3200 -97.3300 251.000 122.0 104.394 4.310 -999.990 -999.990 1.044 ..P WKT 2010 06 11 06 59 55 31.3200 -97.3300 251.000 457.0 100.718 4.200 -999.990 -999.990 1.007 ..P WKT 2010 06 11 07 04 55 31.3200 -97.3300 251.000 30.0 96.764 4.110 -999.990 -999.990 0.968 ..P WKT 2010 06 11 07 09 55 31.3200 -97.3300 251.000 122.0 103.638 4.100 -999.990 -999.990 1.036 ..P WKT 2010 06 11 07 14 55 31.3200 -97.3300 251.000 457.0 92.744 5.180 -999.990 -999.990 0.927 ..P WKT 2010 06 11 07 24 55 31.3200 -97.3300 251.000 30.0 100.068 4.480 -999.990 -999.990 1.001 ..P WKT 2010 06 11 07 29 55 31.3200 -97.3300 251.000 122.0 101.905 4.510 -999.990 -999.990 1.019 ..P WKT 2010 06 11 07 34 55 31.3200 -97.3300 251.000 457.0 93.748 5.380 -999.990 -999.990 0.937 ..P WKT 2010 06 11 07 39 55 31.3200 -97.3300 251.000 30.0 98.778 4.870 -999.990 -999.990 0.988 ..P WKT 2010 06 11 07 44 55 31.3200 -97.3300 251.000 122.0 99.088 5.340 -999.990 -999.990 0.991 ..P WKT 2010 06 11 07 49 55 31.3200 -97.3300 251.000 457.0 94.541 5.550 -999.990 -999.990 0.945 ..P WKT 2010 06 11 07 59 55 31.3200 -97.3300 251.000 30.0 94.527 5.660 -999.990 -999.990 0.945 ..P WKT 2010 06 11 08 04 55 31.3200 -97.3300 251.000 122.0 97.812 5.610 -999.990 -999.990 0.978 ..P WKT 2010 06 11 08 09 55 31.3200 -97.3300 251.000 457.0 89.022 5.490 -999.990 -999.990 0.890 ..P WKT 2010 06 11 08 14 55 31.3200 -97.3300 251.000 30.0 90.919 5.540 -999.990 -999.990 0.909 ..P WKT 2010 06 11 08 19 55 31.3200 -97.3300 251.000 122.0 98.506 5.920 -999.990 -999.990 0.985 ..P WKT 2010 06 11 08 24 55 31.3200 -97.3300 251.000 457.0 97.349 5.540 -999.990 -999.990 0.973 ..P WKT 2010 06 11 08 34 55 31.3200 -97.3300 251.000 30.0 98.703 6.040 -999.990 -999.990 0.987 ..P WKT 2010 06 11 08 39 55 31.3200 -97.3300 251.000 122.0 98.022 5.150 -999.990 -999.990 0.980 ..P WKT 2010 06 11 08 44 55 31.3200 -97.3300 251.000 457.0 103.169 5.100 -999.990 -999.990 1.032 ..P WKT 2010 06 11 08 49 55 31.3200 -97.3300 251.000 30.0 97.216 4.790 -999.990 -999.990 0.972 ..P WKT 2010 06 11 08 54 55 31.3200 -97.3300 251.000 122.0 102.917 5.440 -999.990 -999.990 1.029 ..P WKT 2010 06 11 08 59 55 31.3200 -97.3300 251.000 457.0 101.543 5.420 -999.990 -999.990 1.015 ..P WKT 2010 06 11 09 09 55 31.3200 -97.3300 251.000 30.0 95.722 4.910 -999.990 -999.990 0.957 ..P WKT 2010 06 11 09 14 55 31.3200 -97.3300 251.000 122.0 100.016 4.740 -999.990 -999.990 1.000 ..P WKT 2010 06 11 09 19 55 31.3200 -97.3300 251.000 457.0 97.790 4.900 -999.990 -999.990 0.978 ..P WKT 2010 06 11 09 24 55 31.3200 -97.3300 251.000 30.0 94.315 5.060 -999.990 -999.990 0.943 ..P WKT 2010 06 11 09 29 55 31.3200 -97.3300 251.000 122.0 98.331 5.600 -999.990 -999.990 0.983 ..P WKT 2010 06 11 09 34 55 31.3200 -97.3300 251.000 457.0 96.798 5.570 -999.990 -999.990 0.968 ..P WKT 2010 06 11 09 44 55 31.3200 -97.3300 251.000 30.0 92.980 5.650 -999.990 -999.990 0.930 ..P WKT 2010 06 11 09 49 55 31.3200 -97.3300 251.000 122.0 97.630 5.620 -999.990 -999.990 0.976 ..P WKT 2010 06 11 09 54 55 31.3200 -97.3300 251.000 457.0 89.242 5.080 -999.990 -999.990 0.892 ..P WKT 2010 06 11 09 59 55 31.3200 -97.3300 251.000 30.0 92.782 6.260 -999.990 -999.990 0.928 ..P WKT 2010 06 11 10 04 55 31.3200 -97.3300 251.000 122.0 95.490 5.060 -999.990 -999.990 0.955 ..P WKT 2010 06 11 10 09 55 31.3200 -97.3300 251.000 457.0 97.365 4.950 -999.990 -999.990 0.974 ..P WKT 2010 06 11 10 19 55 31.3200 -97.3300 251.000 30.0 95.133 5.110 -999.990 -999.990 0.951 ..P WKT 2010 06 11 10 24 55 31.3200 -97.3300 251.000 122.0 109.886 4.890 -999.990 -999.990 1.099 ..P WKT 2010 06 11 10 29 55 31.3200 -97.3300 251.000 457.0 94.130 4.920 -999.990 -999.990 0.941 ..P WKT 2010 06 11 10 34 55 31.3200 -97.3300 251.000 30.0 103.890 4.890 -999.990 -999.990 1.039 ..P WKT 2010 06 11 10 39 55 31.3200 -97.3300 251.000 122.0 97.841 4.940 -999.990 -999.990 0.978 ..P WKT 2010 06 11 10 44 55 31.3200 -97.3300 251.000 457.0 98.170 4.940 -999.990 -999.990 0.982 ..P WKT 2010 06 11 10 54 55 31.3200 -97.3300 251.000 30.0 100.197 5.240 -999.990 -999.990 1.002 ..P WKT 2010 06 11 10 59 55 31.3200 -97.3300 251.000 122.0 107.717 4.810 -999.990 -999.990 1.077 ..P WKT 2010 06 11 11 04 55 31.3200 -97.3300 251.000 457.0 96.935 5.000 -999.990 -999.990 0.969 ..P WKT 2010 06 11 11 09 55 31.3200 -97.3300 251.000 30.0 93.086 5.360 -999.990 -999.990 0.931 ..P WKT 2010 06 11 11 14 55 31.3200 -97.3300 251.000 122.0 108.647 5.430 -999.990 -999.990 1.086 ..P WKT 2010 06 11 11 19 55 31.3200 -97.3300 251.000 457.0 99.807 5.420 -999.990 -999.990 0.998 ..P WKT 2010 06 11 11 29 55 31.3200 -97.3300 251.000 30.0 99.189 5.320 -999.990 -999.990 0.992 ..P WKT 2010 06 11 11 34 55 31.3200 -97.3300 251.000 122.0 108.104 5.550 -999.990 -999.990 1.081 ..P WKT 2010 06 11 11 39 55 31.3200 -97.3300 251.000 457.0 107.037 6.110 -999.990 -999.990 1.070 ..P WKT 2010 06 11 11 44 55 31.3200 -97.3300 251.000 30.0 95.298 5.350 -999.990 -999.990 0.953 ..P WKT 2010 06 11 11 49 55 31.3200 -97.3300 251.000 122.0 109.618 6.170 -999.990 -999.990 1.096 ..P WKT 2010 06 11 12 09 55 31.3200 -97.3300 251.000 457.0 95.942 5.390 -999.990 -999.990 0.959 ..P WKT 2010 06 11 12 10 25 31.3200 -97.3300 251.000 457.0 97.295 5.170 -999.990 -999.990 0.973 ..P WKT 2010 06 11 12 10 55 31.3200 -97.3300 251.000 457.0 99.342 5.120 -999.990 -999.990 0.993 ..P WKT 2010 06 11 12 11 25 31.3200 -97.3300 251.000 457.0 101.111 5.510 -999.990 -999.990 1.011 ..P WKT 2010 06 11 12 11 55 31.3200 -97.3300 251.000 457.0 103.158 5.770 -999.990 -999.990 1.032 ..P WKT 2010 06 11 12 12 25 31.3200 -97.3300 251.000 457.0 98.135 5.200 -999.990 -999.990 0.981 ..P WKT 2010 06 11 12 12 55 31.3200 -97.3300 251.000 457.0 103.370 5.430 -999.990 -999.990 1.034 ..P WKT 2010 06 11 12 13 25 31.3200 -97.3300 251.000 457.0 103.615 5.470 -999.990 -999.990 1.036 ..P WKT 2010 06 11 12 13 55 31.3200 -97.3300 251.000 457.0 101.780 5.330 -999.990 -999.990 1.018 ..P WKT 2010 06 11 12 14 25 31.3200 -97.3300 251.000 457.0 104.520 5.390 -999.990 -999.990 1.045 ..P WKT 2010 06 11 12 14 55 31.3200 -97.3300 251.000 457.0 103.379 5.220 -999.990 -999.990 1.034 ..P WKT 2010 06 11 12 19 55 31.3200 -97.3300 251.000 30.0 99.589 5.190 -999.990 -999.990 0.996 ..P WKT 2010 06 11 12 24 55 31.3200 -97.3300 251.000 122.0 102.868 5.590 -999.990 -999.990 1.029 ..P WKT 2010 06 11 12 29 55 31.3200 -97.3300 251.000 457.0 106.702 5.850 -999.990 -999.990 1.067 ..P WKT 2010 06 11 12 34 55 31.3200 -97.3300 251.000 30.0 103.883 6.290 -999.990 -999.990 1.039 ..P WKT 2010 06 11 12 39 55 31.3200 -97.3300 251.000 122.0 108.272 6.390 -999.990 -999.990 1.083 ..P WKT 2010 06 11 12 44 55 31.3200 -97.3300 251.000 457.0 106.700 6.360 -999.990 -999.990 1.067 ..P WKT 2010 06 11 12 54 55 31.3200 -97.3300 251.000 30.0 107.495 6.990 -999.990 -999.990 1.075 ..P WKT 2010 06 11 12 59 55 31.3200 -97.3300 251.000 122.0 103.206 6.200 -999.990 -999.990 1.032 ..P WKT 2010 06 11 13 04 55 31.3200 -97.3300 251.000 457.0 105.435 6.250 -999.990 -999.990 1.054 ..P WKT 2010 06 11 13 09 55 31.3200 -97.3300 251.000 30.0 100.037 5.880 -999.990 -999.990 1.000 ..P WKT 2010 06 11 13 14 55 31.3200 -97.3300 251.000 122.0 104.206 5.530 -999.990 -999.990 1.042 ..P WKT 2010 06 11 13 19 55 31.3200 -97.3300 251.000 457.0 107.129 5.140 -999.990 -999.990 1.071 ..P WKT 2010 06 11 13 29 55 31.3200 -97.3300 251.000 30.0 109.884 4.980 -999.990 -999.990 1.099 ..P WKT 2010 06 11 13 34 55 31.3200 -97.3300 251.000 122.0 108.051 6.300 -999.990 -999.990 1.081 ..P WKT 2010 06 11 13 39 55 31.3200 -97.3300 251.000 457.0 116.760 5.100 -999.990 -999.990 1.168 ..P WKT 2010 06 11 13 44 55 31.3200 -97.3300 251.000 30.0 110.212 5.930 -999.990 -999.990 1.102 ..P WKT 2010 06 11 13 49 55 31.3200 -97.3300 251.000 122.0 113.650 6.990 -999.990 -999.990 1.137 ..P WKT 2010 06 11 13 54 55 31.3200 -97.3300 251.000 457.0 123.470 5.230 -999.990 -999.990 1.235 ..P WKT 2010 06 11 14 04 55 31.3200 -97.3300 251.000 30.0 113.582 5.400 -999.990 -999.990 1.136 ..P WKT 2010 06 11 14 09 55 31.3200 -97.3300 251.000 122.0 114.405 5.070 -999.990 -999.990 1.144 ..P WKT 2010 06 11 14 14 55 31.3200 -97.3300 251.000 457.0 118.836 5.680 -999.990 -999.990 1.188 ..P WKT 2010 06 11 14 19 55 31.3200 -97.3300 251.000 30.0 113.554 4.960 -999.990 -999.990 1.136 ..P WKT 2010 06 11 14 24 55 31.3200 -97.3300 251.000 122.0 119.095 5.210 -999.990 -999.990 1.191 ..P WKT 2010 06 11 14 29 55 31.3200 -97.3300 251.000 457.0 118.253 4.590 -999.990 -999.990 1.183 ..P WKT 2010 06 11 14 39 55 31.3200 -97.3300 251.000 30.0 118.968 4.630 -999.990 -999.990 1.190 ..P WKT 2010 06 11 14 44 55 31.3200 -97.3300 251.000 122.0 128.297 5.370 -999.990 -999.990 1.283 ..P WKT 2010 06 11 14 49 55 31.3200 -97.3300 251.000 457.0 121.250 4.550 -999.990 -999.990 1.213 ..P WKT 2010 06 11 14 54 55 31.3200 -97.3300 251.000 30.0 125.028 4.690 -999.990 -999.990 1.250 ..P WKT 2010 06 11 14 59 55 31.3200 -97.3300 251.000 122.0 129.361 4.640 -999.990 -999.990 1.294 ..P WKT 2010 06 11 15 04 55 31.3200 -97.3300 251.000 457.0 117.871 4.330 -999.990 -999.990 1.179 ..P WKT 2010 06 11 15 14 55 31.3200 -97.3300 251.000 30.0 115.513 4.310 -999.990 -999.990 1.155 ..P WKT 2010 06 11 15 19 55 31.3200 -97.3300 251.000 122.0 120.620 4.590 -999.990 -999.990 1.206 ..P WKT 2010 06 11 15 24 55 31.3200 -97.3300 251.000 457.0 119.203 5.420 -999.990 -999.990 1.192 ..P WKT 2010 06 11 15 29 55 31.3200 -97.3300 251.000 30.0 114.315 6.160 -999.990 -999.990 1.143 ..P WKT 2010 06 11 15 34 55 31.3200 -97.3300 251.000 122.0 118.173 5.560 -999.990 -999.990 1.182 ..P WKT 2010 06 11 15 39 55 31.3200 -97.3300 251.000 457.0 106.760 4.680 -999.990 -999.990 1.068 ..P WKT 2010 06 11 15 49 55 31.3200 -97.3300 251.000 30.0 113.325 5.400 -999.990 -999.990 1.133 ..P WKT 2010 06 11 15 54 55 31.3200 -97.3300 251.000 122.0 126.309 5.600 -999.990 -999.990 1.263 ..P WKT 2010 06 11 15 59 55 31.3200 -97.3300 251.000 457.0 114.854 5.990 -999.990 -999.990 1.149 ..P WKT 2010 06 11 16 04 55 31.3200 -97.3300 251.000 30.0 119.229 5.570 -999.990 -999.990 1.192 ..P WKT 2010 06 11 16 09 55 31.3200 -97.3300 251.000 122.0 118.188 5.590 -999.990 -999.990 1.182 ..P WKT 2010 06 11 16 14 55 31.3200 -97.3300 251.000 457.0 118.259 4.690 -999.990 -999.990 1.183 ..P WKT 2010 06 11 16 24 55 31.3200 -97.3300 251.000 30.0 123.954 4.470 -999.990 -999.990 1.240 ..P WKT 2010 06 11 16 29 55 31.3200 -97.3300 251.000 122.0 129.164 5.140 -999.990 -999.990 1.292 ..P WKT 2010 06 11 16 34 55 31.3200 -97.3300 251.000 457.0 122.428 5.470 -999.990 -999.990 1.224 ..P WKT 2010 06 11 16 39 55 31.3200 -97.3300 251.000 30.0 116.804 6.080 -999.990 -999.990 1.168 ..P WKT 2010 06 11 16 44 55 31.3200 -97.3300 251.000 122.0 129.931 5.800 -999.990 -999.990 1.299 ..P WKT 2010 06 11 16 49 55 31.3200 -97.3300 251.000 457.0 118.195 4.880 -999.990 -999.990 1.182 ..P WKT 2010 06 11 17 04 55 31.3200 -97.3300 251.000 30.0 117.562 5.310 -999.990 -999.990 1.176 ..P WKT 2010 06 11 17 09 55 31.3200 -97.3300 251.000 122.0 126.449 5.730 -999.990 -999.990 1.264 ..P WKT 2010 06 11 17 14 55 31.3200 -97.3300 251.000 457.0 114.357 6.040 -999.990 -999.990 1.144 ..P WKT 2010 06 11 17 19 55 31.3200 -97.3300 251.000 30.0 119.772 5.910 -999.990 -999.990 1.198 ..P WKT 2010 06 11 17 24 55 31.3200 -97.3300 251.000 122.0 126.299 4.430 -999.990 -999.990 1.263 ..P WKT 2010 06 11 17 29 55 31.3200 -97.3300 251.000 457.0 126.711 4.100 -999.990 -999.990 1.267 ..P WKT 2010 06 11 17 39 55 31.3200 -97.3300 251.000 30.0 130.054 4.510 -999.990 -999.990 1.301 ..P WKT 2010 06 11 17 44 55 31.3200 -97.3300 251.000 122.0 126.590 4.670 -999.990 -999.990 1.266 ..P WKT 2010 06 11 17 49 55 31.3200 -97.3300 251.000 457.0 127.575 5.770 -999.990 -999.990 1.276 ..P WKT 2010 06 11 17 54 55 31.3200 -97.3300 251.000 30.0 122.443 4.740 -999.990 -999.990 1.224 ..P WKT 2010 06 11 17 59 55 31.3200 -97.3300 251.000 122.0 128.709 3.590 -999.990 -999.990 1.287 ..P WKT 2010 06 11 18 04 55 31.3200 -97.3300 251.000 457.0 122.187 4.720 -999.990 -999.990 1.222 ..P WKT 2010 06 11 18 14 55 31.3200 -97.3300 251.000 30.0 117.086 4.750 -999.990 -999.990 1.171 ..P WKT 2010 06 11 18 19 55 31.3200 -97.3300 251.000 122.0 123.789 3.880 -999.990 -999.990 1.238 ..P WKT 2010 06 11 18 24 55 31.3200 -97.3300 251.000 457.0 121.317 4.500 -999.990 -999.990 1.213 ..P WKT 2010 06 11 18 29 55 31.3200 -97.3300 251.000 30.0 117.455 4.210 -999.990 -999.990 1.175 ..P WKT 2010 06 11 18 34 55 31.3200 -97.3300 251.000 122.0 128.330 5.340 -999.990 -999.990 1.283 ..P WKT 2010 06 11 18 39 55 31.3200 -97.3300 251.000 457.0 118.351 4.990 -999.990 -999.990 1.184 ..P WKT 2010 06 11 18 49 55 31.3200 -97.3300 251.000 30.0 117.399 4.600 -999.990 -999.990 1.174 ..P WKT 2010 06 11 18 54 55 31.3200 -97.3300 251.000 122.0 120.032 5.370 -999.990 -999.990 1.200 ..P WKT 2010 06 11 18 59 55 31.3200 -97.3300 251.000 457.0 119.050 5.850 -999.990 -999.990 1.190 ..P WKT 2010 06 11 19 04 55 31.3200 -97.3300 251.000 30.0 115.564 4.810 -999.990 -999.990 1.156 ..P WKT 2010 06 11 19 09 55 31.3200 -97.3300 251.000 122.0 122.230 4.220 -999.990 -999.990 1.222 ..P WKT 2010 06 11 19 14 55 31.3200 -97.3300 251.000 457.0 111.374 3.960 -999.990 -999.990 1.114 ..P WKT 2010 06 11 19 24 55 31.3200 -97.3300 251.000 30.0 116.739 3.840 -999.990 -999.990 1.167 ..P WKT 2010 06 11 19 29 55 31.3200 -97.3300 251.000 122.0 121.558 4.190 -999.990 -999.990 1.216 ..P WKT 2010 06 11 19 34 55 31.3200 -97.3300 251.000 457.0 125.821 4.650 -999.990 -999.990 1.258 ..P WKT 2010 06 11 19 39 55 31.3200 -97.3300 251.000 30.0 119.792 4.870 -999.990 -999.990 1.198 ..P WKT 2010 06 11 19 44 55 31.3200 -97.3300 251.000 122.0 123.081 3.520 -999.990 -999.990 1.231 ..P WKT 2010 06 11 19 49 55 31.3200 -97.3300 251.000 457.0 115.104 3.960 -999.990 -999.990 1.151 ..P WKT 2010 06 11 19 59 55 31.3200 -97.3300 251.000 30.0 111.607 3.680 -999.990 -999.990 1.116 ..P WKT 2010 06 11 20 04 55 31.3200 -97.3300 251.000 122.0 126.801 3.420 -999.990 -999.990 1.268 ..P WKT 2010 06 11 20 09 55 31.3200 -97.3300 251.000 457.0 116.120 4.730 -999.990 -999.990 1.161 ..P WKT 2010 06 11 20 14 55 31.3200 -97.3300 251.000 30.0 117.821 4.220 -999.990 -999.990 1.178 ..P WKT 2010 06 11 20 19 55 31.3200 -97.3300 251.000 122.0 125.086 3.620 -999.990 -999.990 1.251 ..P WKT 2010 06 11 20 24 55 31.3200 -97.3300 251.000 457.0 110.229 3.420 -999.990 -999.990 1.102 ..P WKT 2010 06 11 20 34 55 31.3200 -97.3300 251.000 30.0 117.386 3.660 -999.990 -999.990 1.174 ..P WKT 2010 06 11 20 39 55 31.3200 -97.3300 251.000 122.0 125.627 3.300 -999.990 -999.990 1.256 ..P WKT 2010 06 11 20 44 55 31.3200 -97.3300 251.000 457.0 104.089 2.950 -999.990 -999.990 1.041 ..P WKT 2010 06 11 20 49 55 31.3200 -97.3300 251.000 30.0 112.330 6.030 -999.990 -999.990 1.123 ..P WKT 2010 06 11 20 54 55 31.3200 -97.3300 251.000 122.0 114.308 3.400 -999.990 -999.990 1.143 ..P WKT 2010 06 11 20 59 55 31.3200 -97.3300 251.000 457.0 107.798 3.290 -999.990 -999.990 1.078 ..P WKT 2010 06 11 21 09 55 31.3200 -97.3300 251.000 30.0 108.336 2.860 -999.990 -999.990 1.083 ..P WKT 2010 06 11 21 14 55 31.3200 -97.3300 251.000 122.0 113.576 2.620 -999.990 -999.990 1.136 ..P WKT 2010 06 11 21 19 55 31.3200 -97.3300 251.000 457.0 102.670 4.430 -999.990 -999.990 1.027 ..P WKT 2010 06 11 21 24 55 31.3200 -97.3300 251.000 30.0 100.394 2.440 -999.990 -999.990 1.004 ..P WKT 2010 06 11 21 29 55 31.3200 -97.3300 251.000 122.0 110.088 2.770 -999.990 -999.990 1.101 ..P WKT 2010 06 11 21 34 55 31.3200 -97.3300 251.000 457.0 108.925 2.600 -999.990 -999.990 1.089 ..P WKT 2010 06 11 21 44 55 31.3200 -97.3300 251.000 30.0 106.639 2.810 -999.990 -999.990 1.066 ..P WKT 2010 06 11 21 49 55 31.3200 -97.3300 251.000 122.0 108.022 2.530 -999.990 -999.990 1.080 ..P WKT 2010 06 11 21 54 55 31.3200 -97.3300 251.000 457.0 108.291 2.700 -999.990 -999.990 1.083 ..P WKT 2010 06 11 21 59 55 31.3200 -97.3300 251.000 30.0 108.003 2.920 -999.990 -999.990 1.080 ..P WKT 2010 06 11 22 04 55 31.3200 -97.3300 251.000 122.0 103.538 2.940 -999.990 -999.990 1.035 ..P WKT 2010 06 11 22 09 55 31.3200 -97.3300 251.000 457.0 106.035 3.170 -999.990 -999.990 1.060 ..P WKT 2010 06 11 22 19 55 31.3200 -97.3300 251.000 30.0 108.801 3.650 -999.990 -999.990 1.088 ..P WKT 2010 06 11 22 24 55 31.3200 -97.3300 251.000 122.0 110.185 3.090 -999.990 -999.990 1.102 ..P WKT 2010 06 11 22 29 55 31.3200 -97.3300 251.000 457.0 103.770 3.580 -999.990 -999.990 1.038 ..P WKT 2010 06 11 22 34 55 31.3200 -97.3300 251.000 30.0 110.166 3.600 -999.990 -999.990 1.102 ..P WKT 2010 06 11 22 39 55 31.3200 -97.3300 251.000 122.0 107.928 3.280 -999.990 -999.990 1.079 ..P WKT 2010 06 11 22 44 55 31.3200 -97.3300 251.000 457.0 107.084 3.460 -999.990 -999.990 1.071 ..P WKT 2010 06 11 22 54 55 31.3200 -97.3300 251.000 30.0 104.597 4.600 -999.990 -999.990 1.046 ..P WKT 2010 06 11 22 59 55 31.3200 -97.3300 251.000 122.0 107.414 4.300 -999.990 -999.990 1.074 ..P WKT 2010 06 11 23 04 55 31.3200 -97.3300 251.000 457.0 93.794 4.730 -999.990 -999.990 0.938 ..P WKT 2010 06 11 23 09 55 31.3200 -97.3300 251.000 30.0 103.853 6.030 -999.990 -999.990 1.039 ..P WKT 2010 06 11 23 14 55 31.3200 -97.3300 251.000 122.0 104.023 5.840 -999.990 -999.990 1.040 ..P WKT 2010 06 11 23 19 55 31.3200 -97.3300 251.000 457.0 103.496 6.380 -999.990 -999.990 1.035 ..P WKT 2010 06 11 23 29 55 31.3200 -97.3300 251.000 30.0 98.141 5.790 -999.990 -999.990 0.981 ..P WKT 2010 06 11 23 34 55 31.3200 -97.3300 251.000 122.0 101.811 5.280 -999.990 -999.990 1.018 ..P WKT 2010 06 11 23 39 55 31.3200 -97.3300 251.000 457.0 104.366 6.000 -999.990 -999.990 1.044 ..P WKT 2010 06 11 23 44 55 31.3200 -97.3300 251.000 30.0 95.916 6.460 -999.990 -999.990 0.959 ..P WKT 2010 06 11 23 49 55 31.3200 -97.3300 251.000 122.0 103.347 5.810 -999.990 -999.990 1.033 ..P WKT 2010 06 12 00 09 55 31.3200 -97.3300 251.000 457.0 90.530 3.630 -999.990 -999.990 0.905 ..P WKT 2010 06 12 00 10 25 31.3200 -97.3300 251.000 457.0 88.155 4.510 -999.990 -999.990 0.882 ..P WKT 2010 06 12 00 10 55 31.3200 -97.3300 251.000 457.0 95.532 3.370 -999.990 -999.990 0.955 ..P WKT 2010 06 12 00 11 25 31.3200 -97.3300 251.000 457.0 92.460 2.750 -999.990 -999.990 0.925 ..P WKT 2010 06 12 00 11 55 31.3200 -97.3300 251.000 457.0 91.060 2.960 -999.990 -999.990 0.911 ..P WKT 2010 06 12 00 12 25 31.3200 -97.3300 251.000 457.0 89.659 3.160 -999.990 -999.990 0.897 ..P WKT 2010 06 12 00 12 55 31.3200 -97.3300 251.000 457.0 88.260 3.510 -999.990 -999.990 0.883 ..P WKT 2010 06 12 00 13 25 31.3200 -97.3300 251.000 457.0 91.039 2.610 -999.990 -999.990 0.910 ..P WKT 2010 06 12 00 13 55 31.3200 -97.3300 251.000 457.0 92.982 2.680 -999.990 -999.990 0.930 ..P WKT 2010 06 12 00 14 25 31.3200 -97.3300 251.000 457.0 92.279 3.340 -999.990 -999.990 0.923 ..P WKT 2010 06 12 00 14 55 31.3200 -97.3300 251.000 457.0 94.361 3.870 -999.990 -999.990 0.944 ..P WKT 2010 06 12 00 19 55 31.3200 -97.3300 251.000 30.0 99.306 5.120 -999.990 -999.990 0.993 ..P WKT 2010 06 12 00 24 55 31.3200 -97.3300 251.000 122.0 98.818 3.320 -999.990 -999.990 0.988 ..P WKT 2010 06 12 00 29 55 31.3200 -97.3300 251.000 457.0 102.230 3.790 -999.990 -999.990 1.022 ..P WKT 2010 06 12 00 34 55 31.3200 -97.3300 251.000 30.0 94.079 3.280 -999.990 -999.990 0.941 ..P WKT 2010 06 12 00 39 55 31.3200 -97.3300 251.000 122.0 104.038 3.030 -999.990 -999.990 1.040 ..P WKT 2010 06 12 00 44 55 31.3200 -97.3300 251.000 457.0 88.506 4.040 -999.990 -999.990 0.885 ..P WKT 2010 06 12 00 54 55 31.3200 -97.3300 251.000 30.0 101.082 4.820 -999.990 -999.990 1.011 ..P WKT 2010 06 12 00 59 55 31.3200 -97.3300 251.000 122.0 97.850 2.880 -999.990 -999.990 0.978 ..P WKT 2010 06 12 01 04 55 31.3200 -97.3300 251.000 457.0 94.061 3.190 -999.990 -999.990 0.941 ..P WKT 2010 06 12 01 09 55 31.3200 -97.3300 251.000 30.0 98.211 4.390 -999.990 -999.990 0.982 ..P WKT 2010 06 12 01 14 55 31.3200 -97.3300 251.000 122.0 99.296 4.230 -999.990 -999.990 0.993 ..P WKT 2010 06 12 01 19 55 31.3200 -97.3300 251.000 457.0 92.862 4.380 -999.990 -999.990 0.929 ..P WKT 2010 06 12 01 29 55 31.3200 -97.3300 251.000 30.0 100.145 4.120 -999.990 -999.990 1.001 ..P WKT 2010 06 12 01 34 55 31.3200 -97.3300 251.000 122.0 96.039 3.670 -999.990 -999.990 0.960 ..P WKT 2010 06 12 01 39 55 31.3200 -97.3300 251.000 457.0 90.820 3.100 -999.990 -999.990 0.908 ..P WKT 2010 06 12 01 44 55 31.3200 -97.3300 251.000 30.0 94.789 3.470 -999.990 -999.990 0.948 ..P WKT 2010 06 12 01 49 55 31.3200 -97.3300 251.000 122.0 94.025 2.430 -999.990 -999.990 0.940 ..P WKT 2010 06 12 01 54 55 31.3200 -97.3300 251.000 457.0 96.601 3.010 -999.990 -999.990 0.966 ..P WKT 2010 06 12 02 04 55 31.3200 -97.3300 251.000 30.0 84.176 1.880 -999.990 -999.990 0.842 ..P WKT 2010 06 12 02 09 55 31.3200 -97.3300 251.000 122.0 88.941 2.170 -999.990 -999.990 0.889 ..P WKT 2010 06 12 02 14 55 31.3200 -97.3300 251.000 457.0 82.570 2.960 -999.990 -999.990 0.826 ..P WKT 2010 06 12 02 19 55 31.3200 -97.3300 251.000 30.0 87.333 3.760 -999.990 -999.990 0.873 ..P WKT 2010 06 12 02 24 55 31.3200 -97.3300 251.000 122.0 92.375 2.270 -999.990 -999.990 0.924 ..P WKT 2010 06 12 02 29 55 31.3200 -97.3300 251.000 457.0 84.613 2.220 -999.990 -999.990 0.846 ..P WKT 2010 06 12 02 39 55 31.3200 -97.3300 251.000 30.0 91.216 2.250 -999.990 -999.990 0.912 ..P WKT 2010 06 12 02 44 55 31.3200 -97.3300 251.000 122.0 87.491 2.420 -999.990 -999.990 0.875 ..P WKT 2010 06 12 02 49 55 31.3200 -97.3300 251.000 457.0 82.931 2.680 -999.990 -999.990 0.829 ..P WKT 2010 06 12 02 54 55 31.3200 -97.3300 251.000 30.0 89.223 2.420 -999.990 -999.990 0.892 ..P WKT 2010 06 12 02 59 55 31.3200 -97.3300 251.000 122.0 91.064 2.430 -999.990 -999.990 0.911 ..P WKT 2010 06 12 03 04 55 31.3200 -97.3300 251.000 457.0 78.713 1.970 -999.990 -999.990 0.787 ..P WKT 2010 06 12 03 14 55 31.3200 -97.3300 251.000 30.0 84.520 2.290 -999.990 -999.990 0.845 ..P WKT 2010 06 12 03 19 55 31.3200 -97.3300 251.000 122.0 88.765 4.100 -999.990 -999.990 0.888 ..P WKT 2010 06 12 03 24 55 31.3200 -97.3300 251.000 457.0 79.238 3.860 -999.990 -999.990 0.792 ..P WKT 2010 06 12 03 29 55 31.3200 -97.3300 251.000 30.0 88.211 3.000 -999.990 -999.990 0.882 ..P WKT 2010 06 12 03 34 55 31.3200 -97.3300 251.000 122.0 93.846 3.370 -999.990 -999.990 0.938 ..P WKT 2010 06 12 03 39 55 31.3200 -97.3300 251.000 457.0 85.155 3.590 -999.990 -999.990 0.852 ..P WKT 2010 06 12 03 49 55 31.3200 -97.3300 251.000 30.0 95.112 4.300 -999.990 -999.990 0.951 ..P WKT 2010 06 12 03 54 55 31.3200 -97.3300 251.000 122.0 93.871 4.210 -999.990 -999.990 0.939 ..P WKT 2010 06 12 03 59 55 31.3200 -97.3300 251.000 457.0 82.064 3.090 -999.990 -999.990 0.821 ..P WKT 2010 06 12 04 04 55 31.3200 -97.3300 251.000 30.0 85.412 3.780 -999.990 -999.990 0.854 ..P WKT 2010 06 12 04 09 55 31.3200 -97.3300 251.000 122.0 95.714 3.100 -999.990 -999.990 0.957 ..P WKT 2010 06 12 04 14 55 31.3200 -97.3300 251.000 457.0 83.351 2.330 -999.990 -999.990 0.834 ..P WKT 2010 06 12 04 24 55 31.3200 -97.3300 251.000 30.0 83.731 2.100 -999.990 -999.990 0.837 ..P WKT 2010 06 12 04 29 55 31.3200 -97.3300 251.000 122.0 93.137 2.190 -999.990 -999.990 0.931 ..P WKT 2010 06 12 04 34 55 31.3200 -97.3300 251.000 457.0 90.726 2.530 -999.990 -999.990 0.907 ..P WKT 2010 06 12 04 39 55 31.3200 -97.3300 251.000 30.0 81.920 2.380 -999.990 -999.990 0.819 ..P WKT 2010 06 12 04 44 55 31.3200 -97.3300 251.000 122.0 86.320 4.650 -999.990 -999.990 0.863 ..P WKT 2010 06 12 04 49 55 31.3200 -97.3300 251.000 457.0 85.717 2.740 -999.990 -999.990 0.857 ..P WKT 2010 06 12 05 04 55 31.3200 -97.3300 251.000 30.0 81.135 3.760 -999.990 -999.990 0.811 ..P WKT 2010 06 12 05 09 55 31.3200 -97.3300 251.000 122.0 88.527 3.220 -999.990 -999.990 0.885 ..P WKT 2010 06 12 05 14 55 31.3200 -97.3300 251.000 457.0 89.249 2.880 -999.990 -999.990 0.892 ..P WKT 2010 06 12 05 19 55 31.3200 -97.3300 251.000 30.0 91.082 2.930 -999.990 -999.990 0.911 ..P WKT 2010 06 12 05 24 55 31.3200 -97.3300 251.000 122.0 93.471 3.280 -999.990 -999.990 0.935 ..P WKT 2010 06 12 05 29 55 31.3200 -97.3300 251.000 457.0 87.800 3.060 -999.990 -999.990 0.878 ..P WKT 2010 06 12 05 39 55 31.3200 -97.3300 251.000 30.0 91.212 2.980 -999.990 -999.990 0.912 ..P WKT 2010 06 12 05 44 55 31.3200 -97.3300 251.000 122.0 100.849 4.530 -999.990 -999.990 1.008 ..P WKT 2010 06 12 05 49 55 31.3200 -97.3300 251.000 457.0 92.148 3.500 -999.990 -999.990 0.921 ..P WKT 2010 06 12 05 54 55 31.3200 -97.3300 251.000 30.0 90.393 3.250 -999.990 -999.990 0.904 ..P WKT 2010 06 12 05 59 55 31.3200 -97.3300 251.000 122.0 93.084 2.560 -999.990 -999.990 0.931 ..P WKT 2010 06 12 06 04 55 31.3200 -97.3300 251.000 457.0 99.107 2.310 -999.990 -999.990 0.991 ..P WKT 2010 06 12 06 14 55 31.3200 -97.3300 251.000 30.0 93.574 2.690 -999.990 -999.990 0.936 ..P WKT 2010 06 12 06 19 55 31.3200 -97.3300 251.000 122.0 97.574 2.730 -999.990 -999.990 0.976 ..P WKT 2010 06 12 06 24 55 31.3200 -97.3300 251.000 457.0 96.850 2.990 -999.990 -999.990 0.968 ..P WKT 2010 06 12 06 29 55 31.3200 -97.3300 251.000 30.0 94.184 2.410 -999.990 -999.990 0.942 ..P WKT 2010 06 12 06 34 55 31.3200 -97.3300 251.000 122.0 103.459 2.480 -999.990 -999.990 1.035 ..P WKT 2010 06 12 06 39 55 31.3200 -97.3300 251.000 457.0 107.458 2.870 -999.990 -999.990 1.075 ..P WKT 2010 06 12 06 49 55 31.3200 -97.3300 251.000 30.0 101.687 2.290 -999.990 -999.990 1.017 ..P WKT 2010 06 12 06 54 55 31.3200 -97.3300 251.000 122.0 105.249 2.620 -999.990 -999.990 1.052 ..P WKT 2010 06 12 06 59 55 31.3200 -97.3300 251.000 457.0 97.841 2.650 -999.990 -999.990 0.978 ..P WKT 2010 06 12 07 04 55 31.3200 -97.3300 251.000 30.0 94.739 3.360 -999.990 -999.990 0.947 ..P WKT 2010 06 12 07 09 55 31.3200 -97.3300 251.000 122.0 100.243 3.090 -999.990 -999.990 1.002 ..P WKT 2010 06 12 07 14 55 31.3200 -97.3300 251.000 457.0 91.866 2.710 -999.990 -999.990 0.919 ..P WKT 2010 06 12 07 24 55 31.3200 -97.3300 251.000 30.0 102.854 2.670 -999.990 -999.990 1.029 ..P WKT 2010 06 12 07 29 55 31.3200 -97.3300 251.000 122.0 105.979 3.910 -999.990 -999.990 1.060 ..P WKT 2010 06 12 07 34 55 31.3200 -97.3300 251.000 457.0 100.914 3.540 -999.990 -999.990 1.009 ..P WKT 2010 06 12 07 39 55 31.3200 -97.3300 251.000 30.0 100.290 4.310 -999.990 -999.990 1.003 ..P WKT 2010 06 12 07 44 55 31.3200 -97.3300 251.000 122.0 99.667 3.940 -999.990 -999.990 0.997 ..P WKT 2010 06 12 07 49 55 31.3200 -97.3300 251.000 457.0 96.407 3.320 -999.990 -999.990 0.964 ..P WKT 2010 06 12 07 59 55 31.3200 -97.3300 251.000 30.0 92.545 2.950 -999.990 -999.990 0.925 ..P WKT 2010 06 12 08 04 55 31.3200 -97.3300 251.000 122.0 96.520 3.740 -999.990 -999.990 0.965 ..P WKT 2010 06 12 08 09 55 31.3200 -97.3300 251.000 457.0 88.146 4.250 -999.990 -999.990 0.881 ..P WKT 2010 06 12 08 14 55 31.3200 -97.3300 251.000 30.0 90.874 4.400 -999.990 -999.990 0.909 ..P WKT 2010 06 12 08 19 55 31.3200 -97.3300 251.000 122.0 98.318 5.230 -999.990 -999.990 0.983 ..P WKT 2010 06 12 08 24 55 31.3200 -97.3300 251.000 457.0 93.830 5.030 -999.990 -999.990 0.938 ..P WKT 2010 06 12 08 34 55 31.3200 -97.3300 251.000 30.0 100.432 5.480 -999.990 -999.990 1.004 ..P WKT 2010 06 12 08 39 55 31.3200 -97.3300 251.000 122.0 110.272 4.800 -999.990 -999.990 1.103 ..P WKT 2010 06 12 08 44 55 31.3200 -97.3300 251.000 457.0 101.386 4.370 -999.990 -999.990 1.014 ..P WKT 2010 06 12 08 49 55 31.3200 -97.3300 251.000 30.0 99.851 4.600 -999.990 -999.990 0.999 ..P WKT 2010 06 12 08 54 55 31.3200 -97.3300 251.000 122.0 110.106 4.090 -999.990 -999.990 1.101 ..P WKT 2010 06 12 08 59 55 31.3200 -97.3300 251.000 457.0 110.097 3.390 -999.990 -999.990 1.101 ..P WKT 2010 06 12 09 09 55 31.3200 -97.3300 251.000 30.0 101.203 2.860 -999.990 -999.990 1.012 ..P WKT 2010 06 12 09 14 55 31.3200 -97.3300 251.000 122.0 96.479 4.310 -999.990 -999.990 0.965 ..P WKT 2010 06 12 09 19 55 31.3200 -97.3300 251.000 457.0 101.740 4.690 -999.990 -999.990 1.017 ..P WKT 2010 06 12 09 24 55 31.3200 -97.3300 251.000 30.0 98.403 4.540 -999.990 -999.990 0.984 ..P WKT 2010 06 12 09 29 55 31.3200 -97.3300 251.000 122.0 104.773 3.560 -999.990 -999.990 1.048 ..P WKT 2010 06 12 09 34 55 31.3200 -97.3300 251.000 457.0 101.714 2.810 -999.990 -999.990 1.017 ..P WKT 2010 06 12 09 44 55 31.3200 -97.3300 251.000 30.0 101.933 3.260 -999.990 -999.990 1.019 ..P WKT 2010 06 12 09 49 55 31.3200 -97.3300 251.000 122.0 103.826 3.500 -999.990 -999.990 1.038 ..P WKT 2010 06 12 09 54 55 31.3200 -97.3300 251.000 457.0 102.669 5.170 -999.990 -999.990 1.027 ..P WKT 2010 06 12 09 59 55 31.3200 -97.3300 251.000 30.0 98.738 3.200 -999.990 -999.990 0.987 ..P WKT 2010 06 12 10 04 55 31.3200 -97.3300 251.000 122.0 98.967 4.450 -999.990 -999.990 0.990 ..P WKT 2010 06 12 10 09 55 31.3200 -97.3300 251.000 457.0 95.315 2.990 -999.990 -999.990 0.953 ..P WKT 2010 06 12 10 19 55 31.3200 -97.3300 251.000 30.0 98.387 3.520 -999.990 -999.990 0.984 ..P WKT 2010 06 12 10 24 55 31.3200 -97.3300 251.000 122.0 107.327 2.840 -999.990 -999.990 1.073 ..P WKT 2010 06 12 10 29 55 31.3200 -97.3300 251.000 457.0 97.973 3.790 -999.990 -999.990 0.980 ..P WKT 2010 06 12 10 34 55 31.3200 -97.3300 251.000 30.0 103.864 2.620 -999.990 -999.990 1.039 ..P WKT 2010 06 12 10 39 55 31.3200 -97.3300 251.000 122.0 102.549 2.700 -999.990 -999.990 1.025 ..P WKT 2010 06 12 10 44 55 31.3200 -97.3300 251.000 457.0 103.728 2.950 -999.990 -999.990 1.037 ..P WKT 2010 06 12 10 54 55 31.3200 -97.3300 251.000 30.0 104.264 2.660 -999.990 -999.990 1.043 ..P WKT 2010 06 12 10 59 55 31.3200 -97.3300 251.000 122.0 106.532 3.440 -999.990 -999.990 1.065 ..P WKT 2010 06 12 11 04 55 31.3200 -97.3300 251.000 457.0 96.607 2.720 -999.990 -999.990 0.966 ..P WKT 2010 06 12 11 09 55 31.3200 -97.3300 251.000 30.0 92.778 4.670 -999.990 -999.990 0.928 ..P WKT 2010 06 12 11 14 55 31.3200 -97.3300 251.000 122.0 96.986 3.180 -999.990 -999.990 0.970 ..P WKT 2010 06 12 11 19 55 31.3200 -97.3300 251.000 457.0 98.422 4.330 -999.990 -999.990 0.984 ..P WKT 2010 06 12 11 29 55 31.3200 -97.3300 251.000 30.0 95.520 3.890 -999.990 -999.990 0.955 ..P WKT 2010 06 12 11 34 55 31.3200 -97.3300 251.000 122.0 105.588 3.520 -999.990 -999.990 1.056 ..P WKT 2010 06 12 11 39 55 31.3200 -97.3300 251.000 457.0 100.420 3.140 -999.990 -999.990 1.004 ..P WKT 2010 06 12 11 44 55 31.3200 -97.3300 251.000 30.0 96.637 3.010 -999.990 -999.990 0.966 ..P WKT 2010 06 12 11 49 55 31.3200 -97.3300 251.000 122.0 102.549 4.050 -999.990 -999.990 1.025 ..P WKT 2010 06 12 12 09 55 31.3200 -97.3300 251.000 457.0 98.759 2.700 -999.990 -999.990 0.988 ..P WKT 2010 06 12 12 10 25 31.3200 -97.3300 251.000 457.0 97.515 2.670 -999.990 -999.990 0.975 ..P WKT 2010 06 12 12 10 55 31.3200 -97.3300 251.000 457.0 104.029 4.660 -999.990 -999.990 1.040 ..P WKT 2010 06 12 12 11 25 31.3200 -97.3300 251.000 457.0 102.786 5.000 -999.990 -999.990 1.028 ..P WKT 2010 06 12 12 11 55 31.3200 -97.3300 251.000 457.0 103.343 4.150 -999.990 -999.990 1.033 ..P WKT 2010 06 12 12 12 25 31.3200 -97.3300 251.000 457.0 99.746 2.920 -999.990 -999.990 0.997 ..P WKT 2010 06 12 12 12 55 31.3200 -97.3300 251.000 457.0 99.610 2.940 -999.990 -999.990 0.996 ..P WKT 2010 06 12 12 13 25 31.3200 -97.3300 251.000 457.0 99.614 3.320 -999.990 -999.990 0.996 ..P WKT 2010 06 12 12 13 55 31.3200 -97.3300 251.000 457.0 105.158 2.750 -999.990 -999.990 1.052 ..P WKT 2010 06 12 12 14 25 31.3200 -97.3300 251.000 457.0 102.114 2.730 -999.990 -999.990 1.021 ..P WKT 2010 06 12 12 14 55 31.3200 -97.3300 251.000 457.0 101.425 3.330 -999.990 -999.990 1.014 ..P WKT 2010 06 12 12 19 55 31.3200 -97.3300 251.000 30.0 102.152 4.200 -999.990 -999.990 1.022 ..P WKT 2010 06 12 12 24 55 31.3200 -97.3300 251.000 122.0 104.958 3.100 -999.990 -999.990 1.050 ..P WKT 2010 06 12 12 29 55 31.3200 -97.3300 251.000 457.0 102.636 3.850 -999.990 -999.990 1.026 ..P WKT 2010 06 12 12 34 55 31.3200 -97.3300 251.000 30.0 106.275 3.570 -999.990 -999.990 1.063 ..P WKT 2010 06 12 12 39 55 31.3200 -97.3300 251.000 122.0 107.834 3.340 -999.990 -999.990 1.078 ..P WKT 2010 06 12 12 44 55 31.3200 -97.3300 251.000 457.0 104.681 3.500 -999.990 -999.990 1.047 ..P WKT 2010 06 12 12 54 55 31.3200 -97.3300 251.000 30.0 97.724 3.210 -999.990 -999.990 0.977 ..P WKT 2010 06 12 12 59 55 31.3200 -97.3300 251.000 122.0 104.597 3.770 -999.990 -999.990 1.046 ..P WKT 2010 06 12 13 04 55 31.3200 -97.3300 251.000 457.0 101.486 2.720 -999.990 -999.990 1.015 ..P WKT 2010 06 12 13 09 55 31.3200 -97.3300 251.000 30.0 99.762 2.790 -999.990 -999.990 0.998 ..P WKT 2010 06 12 13 14 55 31.3200 -97.3300 251.000 122.0 100.811 4.160 -999.990 -999.990 1.008 ..P WKT 2010 06 12 13 19 55 31.3200 -97.3300 251.000 457.0 98.254 2.900 -999.990 -999.990 0.983 ..P WKT 2010 06 12 13 29 55 31.3200 -97.3300 251.000 30.0 110.025 2.940 -999.990 -999.990 1.100 ..P WKT 2010 06 12 13 34 55 31.3200 -97.3300 251.000 122.0 104.099 2.930 -999.990 -999.990 1.041 ..P WKT 2010 06 12 13 39 55 31.3200 -97.3300 251.000 457.0 96.783 3.510 -999.990 -999.990 0.968 ..P WKT 2010 06 12 13 44 55 31.3200 -97.3300 251.000 30.0 97.793 3.240 -999.990 -999.990 0.978 ..P WKT 2010 06 12 13 49 55 31.3200 -97.3300 251.000 122.0 105.188 3.090 -999.990 -999.990 1.052 ..P WKT 2010 06 12 13 54 55 31.3200 -97.3300 251.000 457.0 97.593 3.270 -999.990 -999.990 0.976 ..P WKT 2010 06 12 14 04 55 31.3200 -97.3300 251.000 30.0 96.559 3.200 -999.990 -999.990 0.966 ..P WKT 2010 06 12 14 09 55 31.3200 -97.3300 251.000 122.0 95.347 4.160 -999.990 -999.990 0.953 ..P WKT 2010 06 12 14 14 55 31.3200 -97.3300 251.000 457.0 88.303 2.520 -999.990 -999.990 0.883 ..P WKT 2010 06 12 14 19 55 31.3200 -97.3300 251.000 30.0 93.480 3.010 -999.990 -999.990 0.935 ..P WKT 2010 06 12 14 24 55 31.3200 -97.3300 251.000 122.0 102.825 3.520 -999.990 -999.990 1.028 ..P WKT 2010 06 12 14 29 55 31.3200 -97.3300 251.000 457.0 93.834 2.900 -999.990 -999.990 0.938 ..P WKT 2010 06 12 14 39 55 31.3200 -97.3300 251.000 30.0 98.555 4.720 -999.990 -999.990 0.986 ..P WKT 2010 06 12 14 44 55 31.3200 -97.3300 251.000 122.0 99.487 2.620 -999.990 -999.990 0.995 ..P WKT 2010 06 12 14 49 55 31.3200 -97.3300 251.000 457.0 94.999 2.450 -999.990 -999.990 0.950 ..P WKT 2010 06 12 14 54 55 31.3200 -97.3300 251.000 30.0 92.456 2.940 -999.990 -999.990 0.925 ..P WKT 2010 06 12 14 59 55 31.3200 -97.3300 251.000 122.0 97.002 4.160 -999.990 -999.990 0.970 ..P WKT 2010 06 12 15 04 55 31.3200 -97.3300 251.000 457.0 91.400 3.470 -999.990 -999.990 0.914 ..P WKT 2010 06 12 15 14 55 31.3200 -97.3300 251.000 30.0 85.774 3.410 -999.990 -999.990 0.858 ..P WKT 2010 06 12 15 19 55 31.3200 -97.3300 251.000 122.0 93.123 3.250 -999.990 -999.990 0.931 ..P WKT 2010 06 12 15 24 55 31.3200 -97.3300 251.000 457.0 91.711 3.820 -999.990 -999.990 0.917 ..P WKT 2010 06 12 15 29 55 31.3200 -97.3300 251.000 30.0 92.524 2.680 -999.990 -999.990 0.925 ..P WKT 2010 06 12 15 34 55 31.3200 -97.3300 251.000 122.0 105.580 3.500 -999.990 -999.990 1.056 ..P WKT 2010 06 12 15 39 55 31.3200 -97.3300 251.000 457.0 90.394 3.630 -999.990 -999.990 0.904 ..P WKT 2010 06 12 15 49 55 31.3200 -97.3300 251.000 30.0 86.633 3.730 -999.990 -999.990 0.866 ..P WKT 2010 06 12 15 54 55 31.3200 -97.3300 251.000 122.0 98.342 2.560 -999.990 -999.990 0.983 ..P WKT 2010 06 12 15 59 55 31.3200 -97.3300 251.000 457.0 89.034 3.090 -999.990 -999.990 0.890 ..P WKT 2010 06 12 16 04 55 31.3200 -97.3300 251.000 30.0 92.671 2.860 -999.990 -999.990 0.927 ..P WKT 2010 06 12 16 09 55 31.3200 -97.3300 251.000 122.0 98.677 2.290 -999.990 -999.990 0.987 ..P WKT 2010 06 12 16 14 55 31.3200 -97.3300 251.000 457.0 87.835 2.010 -999.990 -999.990 0.878 ..P WKT 2010 06 12 16 24 55 31.3200 -97.3300 251.000 30.0 87.770 2.130 -999.990 -999.990 0.878 ..P WKT 2010 06 12 16 29 55 31.3200 -97.3300 251.000 122.0 91.450 2.300 -999.990 -999.990 0.915 ..P WKT 2010 06 12 16 34 55 31.3200 -97.3300 251.000 457.0 92.622 2.630 -999.990 -999.990 0.926 ..P WKT 2010 06 12 16 39 55 31.3200 -97.3300 251.000 30.0 92.402 3.160 -999.990 -999.990 0.924 ..P WKT 2010 06 12 16 44 55 31.3200 -97.3300 251.000 122.0 99.845 3.800 -999.990 -999.990 0.998 ..P WKT 2010 06 12 16 49 55 31.3200 -97.3300 251.000 457.0 87.502 2.510 -999.990 -999.990 0.875 ..P WKT 2010 06 12 17 04 55 31.3200 -97.3300 251.000 30.0 85.504 2.340 -999.990 -999.990 0.855 ..P WKT 2010 06 12 17 09 55 31.3200 -97.3300 251.000 122.0 94.932 2.430 -999.990 -999.990 0.949 ..P WKT 2010 06 12 17 14 55 31.3200 -97.3300 251.000 457.0 80.380 3.180 -999.990 -999.990 0.804 ..P WKT 2010 06 12 17 19 55 31.3200 -97.3300 251.000 30.0 86.463 2.130 -999.990 -999.990 0.865 ..P WKT 2010 06 12 17 24 55 31.3200 -97.3300 251.000 122.0 97.009 2.640 -999.990 -999.990 0.970 ..P WKT 2010 06 12 17 29 55 31.3200 -97.3300 251.000 457.0 91.100 3.050 -999.990 -999.990 0.911 ..P WKT 2010 06 12 17 39 55 31.3200 -97.3300 251.000 30.0 94.813 2.020 -999.990 -999.990 0.948 ..P WKT 2010 06 12 17 44 55 31.3200 -97.3300 251.000 122.0 94.393 2.390 -999.990 -999.990 0.944 ..P WKT 2010 06 12 17 49 55 31.3200 -97.3300 251.000 457.0 87.834 2.590 -999.990 -999.990 0.878 ..P WKT 2010 06 12 17 54 55 31.3200 -97.3300 251.000 30.0 87.134 2.510 -999.990 -999.990 0.871 ..P WKT 2010 06 12 17 59 55 31.3200 -97.3300 251.000 122.0 93.691 3.210 -999.990 -999.990 0.937 ..P WKT 2010 06 12 18 04 55 31.3200 -97.3300 251.000 457.0 87.408 2.920 -999.990 -999.990 0.874 ..P WKT 2010 06 12 18 14 55 31.3200 -97.3300 251.000 30.0 87.902 3.100 -999.990 -999.990 0.879 ..P WKT 2010 06 12 18 19 55 31.3200 -97.3300 251.000 122.0 91.890 3.170 -999.990 -999.990 0.919 ..P WKT 2010 06 12 18 24 55 31.3200 -97.3300 251.000 457.0 88.617 3.360 -999.990 -999.990 0.886 ..P WKT 2010 06 12 18 29 55 31.3200 -97.3300 251.000 30.0 92.605 3.300 -999.990 -999.990 0.926 ..P WKT 2010 06 12 18 34 55 31.3200 -97.3300 251.000 122.0 93.800 3.070 -999.990 -999.990 0.938 ..P WKT 2010 06 12 18 39 55 31.3200 -97.3300 251.000 457.0 88.570 4.630 -999.990 -999.990 0.886 ..P WKT 2010 06 12 18 49 55 31.3200 -97.3300 251.000 30.0 89.724 3.270 -999.990 -999.990 0.897 ..P WKT 2010 06 12 18 54 55 31.3200 -97.3300 251.000 122.0 96.389 3.630 -999.990 -999.990 0.964 ..P WKT 2010 06 12 18 59 55 31.3200 -97.3300 251.000 457.0 92.435 3.450 -999.990 -999.990 0.924 ..P WKT 2010 06 12 19 04 55 31.3200 -97.3300 251.000 30.0 90.717 2.870 -999.990 -999.990 0.907 ..P WKT 2010 06 12 19 09 55 31.3200 -97.3300 251.000 122.0 97.804 3.400 -999.990 -999.990 0.978 ..P WKT 2010 06 12 19 14 55 31.3200 -97.3300 251.000 457.0 85.321 3.030 -999.990 -999.990 0.853 ..P WKT 2010 06 12 19 24 55 31.3200 -97.3300 251.000 30.0 92.946 3.550 -999.990 -999.990 0.929 ..P WKT 2010 06 12 19 29 55 31.3200 -97.3300 251.000 122.0 97.120 3.700 -999.990 -999.990 0.971 ..P WKT 2010 06 12 19 34 55 31.3200 -97.3300 251.000 457.0 95.840 3.150 -999.990 -999.990 0.958 ..P WKT 2010 06 12 19 39 55 31.3200 -97.3300 251.000 30.0 103.092 3.360 -999.990 -999.990 1.031 ..P WKT 2010 06 12 19 44 55 31.3200 -97.3300 251.000 122.0 101.393 2.920 -999.990 -999.990 1.014 ..P WKT 2010 06 12 19 49 55 31.3200 -97.3300 251.000 457.0 91.579 4.400 -999.990 -999.990 0.916 ..P WKT 2010 06 12 19 59 55 31.3200 -97.3300 251.000 30.0 93.895 2.840 -999.990 -999.990 0.939 ..P WKT 2010 06 12 20 04 55 31.3200 -97.3300 251.000 122.0 98.192 3.370 -999.990 -999.990 0.982 ..P WKT 2010 06 12 20 09 55 31.3200 -97.3300 251.000 457.0 96.191 3.630 -999.990 -999.990 0.962 ..P WKT 2010 06 12 20 14 55 31.3200 -97.3300 251.000 30.0 89.431 4.220 -999.990 -999.990 0.894 ..P WKT 2010 06 12 20 19 55 31.3200 -97.3300 251.000 122.0 94.849 3.360 -999.990 -999.990 0.948 ..P WKT 2010 06 12 20 24 55 31.3200 -97.3300 251.000 457.0 85.988 3.430 -999.990 -999.990 0.860 ..P WKT 2010 06 12 20 34 55 31.3200 -97.3300 251.000 30.0 88.583 3.760 -999.990 -999.990 0.886 ..P WKT 2010 06 12 20 39 55 31.3200 -97.3300 251.000 122.0 87.160 3.250 -999.990 -999.990 0.872 ..P WKT 2010 06 12 20 44 55 31.3200 -97.3300 251.000 457.0 88.539 4.330 -999.990 -999.990 0.885 ..P WKT 2010 06 12 20 49 55 31.3200 -97.3300 251.000 30.0 91.459 4.090 -999.990 -999.990 0.915 ..P WKT 2010 06 12 20 54 55 31.3200 -97.3300 251.000 122.0 90.176 3.230 -999.990 -999.990 0.902 ..P WKT 2010 06 12 20 59 55 31.3200 -97.3300 251.000 457.0 91.696 2.460 -999.990 -999.990 0.917 ..P WKT 2010 06 12 21 09 55 31.3200 -97.3300 251.000 30.0 93.153 2.470 -999.990 -999.990 0.932 ..P WKT 2010 06 12 21 14 55 31.3200 -97.3300 251.000 122.0 91.690 3.640 -999.990 -999.990 0.917 ..P WKT 2010 06 12 21 19 55 31.3200 -97.3300 251.000 457.0 85.461 5.250 -999.990 -999.990 0.855 ..P WKT 2010 06 12 21 24 55 31.3200 -97.3300 251.000 30.0 83.716 6.650 -999.990 -999.990 0.837 ..P WKT 2010 06 12 21 29 55 31.3200 -97.3300 251.000 122.0 91.505 5.650 -999.990 -999.990 0.915 ..P WKT 2010 06 12 21 34 55 31.3200 -97.3300 251.000 457.0 91.163 3.560 -999.990 -999.990 0.912 ..P WKT 2010 06 12 21 44 55 31.3200 -97.3300 251.000 30.0 91.800 3.450 -999.990 -999.990 0.918 ..P WKT 2010 06 12 21 49 55 31.3200 -97.3300 251.000 122.0 97.549 5.450 -999.990 -999.990 0.975 ..P WKT 2010 06 12 21 54 55 31.3200 -97.3300 251.000 457.0 90.956 6.400 -999.990 -999.990 0.910 ..P WKT 2010 06 12 21 59 55 31.3200 -97.3300 251.000 30.0 93.900 7.320 -999.990 -999.990 0.939 ..P WKT 2010 06 12 22 04 55 31.3200 -97.3300 251.000 122.0 99.932 6.070 -999.990 -999.990 0.999 ..P WKT 2010 06 12 22 09 55 31.3200 -97.3300 251.000 457.0 97.826 3.870 -999.990 -999.990 0.978 ..P WKT 2010 06 12 22 19 55 31.3200 -97.3300 251.000 30.0 94.937 4.410 -999.990 -999.990 0.949 ..P WKT 2010 06 12 22 24 55 31.3200 -97.3300 251.000 122.0 103.418 6.140 -999.990 -999.990 1.034 ..P WKT 2010 06 12 22 29 55 31.3200 -97.3300 251.000 457.0 92.527 7.210 -999.990 -999.990 0.925 ..P WKT 2010 06 12 22 34 55 31.3200 -97.3300 251.000 30.0 93.148 5.660 -999.990 -999.990 0.931 ..P WKT 2010 06 12 22 39 55 31.3200 -97.3300 251.000 122.0 95.172 5.060 -999.990 -999.990 0.952 ..P WKT 2010 06 12 22 44 55 31.3200 -97.3300 251.000 457.0 90.877 2.870 -999.990 -999.990 0.909 ..P WKT 2010 06 12 22 54 55 31.3200 -97.3300 251.000 30.0 91.997 2.950 -999.990 -999.990 0.920 ..P WKT 2010 06 12 22 59 55 31.3200 -97.3300 251.000 122.0 94.886 4.750 -999.990 -999.990 0.949 ..P WKT 2010 06 12 23 04 55 31.3200 -97.3300 251.000 457.0 92.014 4.990 -999.990 -999.990 0.920 ..P WKT 2010 06 12 23 09 55 31.3200 -97.3300 251.000 30.0 92.795 4.220 -999.990 -999.990 0.928 ..P WKT 2010 06 12 23 14 55 31.3200 -97.3300 251.000 122.0 101.446 3.260 -999.990 -999.990 1.014 ..P WKT 2010 06 12 23 19 55 31.3200 -97.3300 251.000 457.0 93.796 2.310 -999.990 -999.990 0.938 ..P WKT 2010 06 12 23 29 55 31.3200 -97.3300 251.000 30.0 97.161 2.160 -999.990 -999.990 0.972 ..P WKT 2010 06 12 23 34 55 31.3200 -97.3300 251.000 122.0 101.714 3.390 -999.990 -999.990 1.017 ..P WKT 2010 06 12 23 39 55 31.3200 -97.3300 251.000 457.0 91.365 3.520 -999.990 -999.990 0.914 ..P WKT 2010 06 12 23 44 55 31.3200 -97.3300 251.000 30.0 88.887 3.770 -999.990 -999.990 0.889 ..P WKT 2010 06 12 23 49 55 31.3200 -97.3300 251.000 122.0 100.472 3.320 -999.990 -999.990 1.005 ..P WKT 2010 06 13 00 09 55 31.3200 -97.3300 251.000 457.0 90.925 3.560 -999.990 -999.990 0.909 ..P WKT 2010 06 13 00 10 25 31.3200 -97.3300 251.000 457.0 85.798 2.730 -999.990 -999.990 0.858 ..P WKT 2010 06 13 00 10 55 31.3200 -97.3300 251.000 457.0 92.628 2.450 -999.990 -999.990 0.926 ..P WKT 2010 06 13 00 11 25 31.3200 -97.3300 251.000 457.0 91.160 2.480 -999.990 -999.990 0.912 ..P WKT 2010 06 13 00 11 55 31.3200 -97.3300 251.000 457.0 87.018 2.840 -999.990 -999.990 0.870 ..P WKT 2010 06 13 00 12 25 31.3200 -97.3300 251.000 457.0 87.237 4.520 -999.990 -999.990 0.872 ..P WKT 2010 06 13 00 12 55 31.3200 -97.3300 251.000 457.0 87.034 3.770 -999.990 -999.990 0.870 ..P WKT 2010 06 13 00 13 25 31.3200 -97.3300 251.000 457.0 85.143 2.960 -999.990 -999.990 0.851 ..P WKT 2010 06 13 00 13 55 31.3200 -97.3300 251.000 457.0 86.628 2.770 -999.990 -999.990 0.866 ..P WKT 2010 06 13 00 14 25 31.3200 -97.3300 251.000 457.0 87.832 3.160 -999.990 -999.990 0.878 ..P WKT 2010 06 13 00 14 55 31.3200 -97.3300 251.000 457.0 85.660 3.670 -999.990 -999.990 0.857 ..P WKT 2010 06 13 00 19 55 31.3200 -97.3300 251.000 30.0 92.350 4.430 -999.990 -999.990 0.923 ..P WKT 2010 06 13 00 24 55 31.3200 -97.3300 251.000 122.0 93.133 4.040 -999.990 -999.990 0.931 ..P WKT 2010 06 13 00 29 55 31.3200 -97.3300 251.000 457.0 92.369 3.550 -999.990 -999.990 0.924 ..P WKT 2010 06 13 00 34 55 31.3200 -97.3300 251.000 30.0 94.135 3.650 -999.990 -999.990 0.941 ..P WKT 2010 06 13 00 39 55 31.3200 -97.3300 251.000 122.0 101.808 3.400 -999.990 -999.990 1.018 ..P WKT 2010 06 13 00 44 55 31.3200 -97.3300 251.000 457.0 101.746 5.080 -999.990 -999.990 1.017 ..P WKT 2010 06 13 00 54 55 31.3200 -97.3300 251.000 30.0 99.205 4.190 -999.990 -999.990 0.992 ..P WKT 2010 06 13 00 59 55 31.3200 -97.3300 251.000 122.0 97.005 3.430 -999.990 -999.990 0.970 ..P WKT 2010 06 13 01 04 55 31.3200 -97.3300 251.000 457.0 92.558 3.830 -999.990 -999.990 0.926 ..P WKT 2010 06 13 01 09 55 31.3200 -97.3300 251.000 30.0 86.986 2.870 -999.990 -999.990 0.870 ..P WKT 2010 06 13 01 14 55 31.3200 -97.3300 251.000 122.0 98.843 3.160 -999.990 -999.990 0.988 ..P WKT 2010 06 13 01 19 55 31.3200 -97.3300 251.000 457.0 89.617 2.020 -999.990 -999.990 0.896 ..P WKT 2010 06 13 01 29 55 31.3200 -97.3300 251.000 30.0 86.708 2.250 -999.990 -999.990 0.867 ..P WKT 2010 06 13 01 34 55 31.3200 -97.3300 251.000 122.0 95.833 3.460 -999.990 -999.990 0.958 ..P WKT 2010 06 13 01 39 55 31.3200 -97.3300 251.000 457.0 87.532 2.920 -999.990 -999.990 0.875 ..P WKT 2010 06 13 01 44 55 31.3200 -97.3300 251.000 30.0 89.631 2.290 -999.990 -999.990 0.896 ..P WKT 2010 06 13 01 49 55 31.3200 -97.3300 251.000 122.0 95.100 4.390 -999.990 -999.990 0.951 ..P WKT 2010 06 13 01 54 55 31.3200 -97.3300 251.000 457.0 93.265 3.260 -999.990 -999.990 0.933 ..P WKT 2010 06 13 02 04 55 31.3200 -97.3300 251.000 30.0 95.072 3.090 -999.990 -999.990 0.951 ..P WKT 2010 06 13 02 09 55 31.3200 -97.3300 251.000 122.0 96.466 2.600 -999.990 -999.990 0.965 ..P WKT 2010 06 13 02 14 55 31.3200 -97.3300 251.000 457.0 93.929 2.440 -999.990 -999.990 0.939 ..P WKT 2010 06 13 02 19 55 31.3200 -97.3300 251.000 30.0 91.953 2.190 -999.990 -999.990 0.920 ..P WKT 2010 06 13 02 24 55 31.3200 -97.3300 251.000 122.0 90.539 2.210 -999.990 -999.990 0.905 ..P WKT 2010 06 13 02 29 55 31.3200 -97.3300 251.000 457.0 87.722 2.530 -999.990 -999.990 0.877 ..P WKT 2010 06 13 02 39 55 31.3200 -97.3300 251.000 30.0 97.431 2.130 -999.990 -999.990 0.974 ..P WKT 2010 06 13 02 44 55 31.3200 -97.3300 251.000 122.0 95.495 2.650 -999.990 -999.990 0.955 ..P WKT 2010 06 13 02 49 55 31.3200 -97.3300 251.000 457.0 95.667 2.490 -999.990 -999.990 0.957 ..P WKT 2010 06 13 02 54 55 31.3200 -97.3300 251.000 30.0 98.785 2.910 -999.990 -999.990 0.988 ..P WKT 2010 06 13 02 59 55 31.3200 -97.3300 251.000 122.0 97.973 2.510 -999.990 -999.990 0.980 ..P WKT 2010 06 13 03 04 55 31.3200 -97.3300 251.000 457.0 96.319 2.600 -999.990 -999.990 0.963 ..P WKT 2010 06 13 03 14 55 31.3200 -97.3300 251.000 30.0 97.402 2.650 -999.990 -999.990 0.974 ..P WKT 2010 06 13 03 19 55 31.3200 -97.3300 251.000 122.0 95.649 4.170 -999.990 -999.990 0.956 ..P WKT 2010 06 13 03 24 55 31.3200 -97.3300 251.000 457.0 88.421 2.910 -999.990 -999.990 0.884 ..P WKT 2010 06 13 03 29 55 31.3200 -97.3300 251.000 30.0 93.263 3.560 -999.990 -999.990 0.933 ..P WKT 2010 06 13 03 34 55 31.3200 -97.3300 251.000 122.0 94.316 3.370 -999.990 -999.990 0.943 ..P WKT 2010 06 13 03 39 55 31.3200 -97.3300 251.000 457.0 94.387 2.700 -999.990 -999.990 0.944 ..P WKT 2010 06 13 03 49 55 31.3200 -97.3300 251.000 30.0 94.187 3.440 -999.990 -999.990 0.942 ..P WKT 2010 06 13 03 54 55 31.3200 -97.3300 251.000 122.0 102.895 3.790 -999.990 -999.990 1.029 ..P WKT 2010 06 13 03 59 55 31.3200 -97.3300 251.000 457.0 101.082 3.480 -999.990 -999.990 1.011 ..P WKT 2010 06 13 04 04 55 31.3200 -97.3300 251.000 30.0 96.323 3.350 -999.990 -999.990 0.963 ..P WKT 2010 06 13 04 09 55 31.3200 -97.3300 251.000 122.0 94.089 3.700 -999.990 -999.990 0.941 ..P WKT 2010 06 13 04 14 55 31.3200 -97.3300 251.000 457.0 85.124 4.160 -999.990 -999.990 0.851 ..P WKT 2010 06 13 04 24 55 31.3200 -97.3300 251.000 30.0 93.180 4.650 -999.990 -999.990 0.932 ..P WKT 2010 06 13 04 29 55 31.3200 -97.3300 251.000 122.0 96.595 5.250 -999.990 -999.990 0.966 ..P WKT 2010 06 13 04 34 55 31.3200 -97.3300 251.000 457.0 94.963 4.870 -999.990 -999.990 0.950 ..P WKT 2010 06 13 04 39 55 31.3200 -97.3300 251.000 30.0 94.733 4.530 -999.990 -999.990 0.947 ..P WKT 2010 06 13 04 44 55 31.3200 -97.3300 251.000 122.0 92.821 4.630 -999.990 -999.990 0.928 ..P WKT 2010 06 13 04 49 55 31.3200 -97.3300 251.000 457.0 92.311 5.160 -999.990 -999.990 0.923 ..P WKT 2010 06 13 05 04 55 31.3200 -97.3300 251.000 30.0 88.168 4.430 -999.990 -999.990 0.882 ..P WKT 2010 06 13 05 09 55 31.3200 -97.3300 251.000 122.0 85.511 4.610 -999.990 -999.990 0.855 ..P WKT 2010 06 13 05 14 55 31.3200 -97.3300 251.000 457.0 83.135 4.140 -999.990 -999.990 0.831 ..P WKT 2010 06 13 05 19 55 31.3200 -97.3300 251.000 30.0 86.644 3.440 -999.990 -999.990 0.866 ..P WKT 2010 06 13 05 24 55 31.3200 -97.3300 251.000 122.0 96.039 3.190 -999.990 -999.990 0.960 ..P WKT 2010 06 13 05 29 55 31.3200 -97.3300 251.000 457.0 97.865 4.450 -999.990 -999.990 0.979 ..P WKT 2010 06 13 05 39 55 31.3200 -97.3300 251.000 30.0 99.342 2.900 -999.990 -999.990 0.993 ..P WKT 2010 06 13 05 44 55 31.3200 -97.3300 251.000 122.0 98.992 3.260 -999.990 -999.990 0.990 ..P WKT 2010 06 13 05 49 55 31.3200 -97.3300 251.000 457.0 104.805 3.030 -999.990 -999.990 1.048 ..P WKT 2010 06 13 05 54 55 31.3200 -97.3300 251.000 30.0 93.810 4.260 -999.990 -999.990 0.938 ..P WKT 2010 06 13 05 59 55 31.3200 -97.3300 251.000 122.0 95.701 3.030 -999.990 -999.990 0.957 ..P WKT 2010 06 13 06 04 55 31.3200 -97.3300 251.000 457.0 92.550 3.520 -999.990 -999.990 0.925 ..P WKT 2010 06 13 06 14 55 31.3200 -97.3300 251.000 30.0 89.411 3.740 -999.990 -999.990 0.894 ..P WKT 2010 06 13 06 19 55 31.3200 -97.3300 251.000 122.0 96.423 3.220 -999.990 -999.990 0.964 ..P WKT 2010 06 13 06 24 55 31.3200 -97.3300 251.000 457.0 100.354 3.460 -999.990 -999.990 1.004 ..P WKT 2010 06 13 06 29 55 31.3200 -97.3300 251.000 30.0 95.884 3.470 -999.990 -999.990 0.959 ..P WKT 2010 06 13 06 34 55 31.3200 -97.3300 251.000 122.0 97.294 3.430 -999.990 -999.990 0.973 ..P WKT 2010 06 13 06 39 55 31.3200 -97.3300 251.000 457.0 95.205 3.880 -999.990 -999.990 0.952 ..P WKT 2010 06 13 06 49 55 31.3200 -97.3300 251.000 30.0 98.825 3.680 -999.990 -999.990 0.988 ..P WKT 2010 06 13 06 54 55 31.3200 -97.3300 251.000 122.0 97.396 3.660 -999.990 -999.990 0.974 ..P WKT 2010 06 13 06 59 55 31.3200 -97.3300 251.000 457.0 93.028 4.160 -999.990 -999.990 0.930 ..P WKT 2010 06 13 07 04 55 31.3200 -97.3300 251.000 30.0 89.919 3.920 -999.990 -999.990 0.899 ..P WKT 2010 06 13 07 09 55 31.3200 -97.3300 251.000 122.0 91.150 4.130 -999.990 -999.990 0.912 ..P WKT 2010 06 13 07 14 55 31.3200 -97.3300 251.000 457.0 90.701 4.460 -999.990 -999.990 0.907 ..P WKT 2010 06 13 07 24 55 31.3200 -97.3300 251.000 30.0 85.186 4.650 -999.990 -999.990 0.852 ..P WKT 2010 06 13 07 29 55 31.3200 -97.3300 251.000 122.0 94.531 4.220 -999.990 -999.990 0.945 ..P WKT 2010 06 13 07 34 55 31.3200 -97.3300 251.000 457.0 97.020 4.730 -999.990 -999.990 0.970 ..P WKT 2010 06 13 07 39 55 31.3200 -97.3300 251.000 30.0 92.653 4.070 -999.990 -999.990 0.927 ..P WKT 2010 06 13 07 44 55 31.3200 -97.3300 251.000 122.0 95.561 4.670 -999.990 -999.990 0.956 ..P WKT 2010 06 13 07 49 55 31.3200 -97.3300 251.000 457.0 95.112 5.920 -999.990 -999.990 0.951 ..P WKT 2010 06 13 07 59 55 31.3200 -97.3300 251.000 30.0 84.205 4.400 -999.990 -999.990 0.842 ..P WKT 2010 06 13 08 04 55 31.3200 -97.3300 251.000 122.0 92.907 4.450 -999.990 -999.990 0.929 ..P WKT 2010 06 13 08 09 55 31.3200 -97.3300 251.000 457.0 88.183 4.620 -999.990 -999.990 0.882 ..P WKT 2010 06 13 08 14 55 31.3200 -97.3300 251.000 30.0 90.171 3.810 -999.990 -999.990 0.902 ..P WKT 2010 06 13 08 19 55 31.3200 -97.3300 251.000 122.0 95.375 3.890 -999.990 -999.990 0.954 ..P WKT 2010 06 13 08 24 55 31.3200 -97.3300 251.000 457.0 88.276 3.920 -999.990 -999.990 0.883 ..P WKT 2010 06 13 08 34 55 31.3200 -97.3300 251.000 30.0 89.476 3.480 -999.990 -999.990 0.895 ..P WKT 2010 06 13 08 39 55 31.3200 -97.3300 251.000 122.0 104.623 4.560 -999.990 -999.990 1.046 ..P WKT 2010 06 13 08 44 55 31.3200 -97.3300 251.000 457.0 96.287 4.690 -999.990 -999.990 0.963 ..P WKT 2010 06 13 08 49 55 31.3200 -97.3300 251.000 30.0 93.542 3.750 -999.990 -999.990 0.935 ..P WKT 2010 06 13 08 54 55 31.3200 -97.3300 251.000 122.0 93.872 4.400 -999.990 -999.990 0.939 ..P WKT 2010 06 13 08 59 55 31.3200 -97.3300 251.000 457.0 93.084 3.670 -999.990 -999.990 0.931 ..P WKT 2010 06 13 09 09 55 31.3200 -97.3300 251.000 30.0 94.663 3.910 -999.990 -999.990 0.947 ..P WKT 2010 06 13 09 14 55 31.3200 -97.3300 251.000 122.0 102.059 4.340 -999.990 -999.990 1.021 ..P WKT 2010 06 13 09 19 55 31.3200 -97.3300 251.000 457.0 97.718 3.930 -999.990 -999.990 0.977 ..P WKT 2010 06 13 09 24 55 31.3200 -97.3300 251.000 30.0 93.937 3.870 -999.990 -999.990 0.939 ..P WKT 2010 06 13 09 29 55 31.3200 -97.3300 251.000 122.0 97.978 4.440 -999.990 -999.990 0.980 ..P WKT 2010 06 13 09 34 55 31.3200 -97.3300 251.000 457.0 103.416 4.130 -999.990 -999.990 1.034 ..P WKT 2010 06 13 09 44 55 31.3200 -97.3300 251.000 30.0 97.451 4.410 -999.990 -999.990 0.975 ..P WKT 2010 06 13 09 49 55 31.3200 -97.3300 251.000 122.0 100.573 4.010 -999.990 -999.990 1.006 ..P WKT 2010 06 13 09 54 55 31.3200 -97.3300 251.000 457.0 98.948 5.710 -999.990 -999.990 0.989 ..P WKT 2010 06 13 09 59 55 31.3200 -97.3300 251.000 30.0 92.016 4.280 -999.990 -999.990 0.920 ..P WKT 2010 06 13 10 04 55 31.3200 -97.3300 251.000 122.0 91.229 4.300 -999.990 -999.990 0.912 ..P WKT 2010 06 13 10 09 55 31.3200 -97.3300 251.000 457.0 94.072 4.990 -999.990 -999.990 0.941 ..P WKT 2010 06 13 10 19 55 31.3200 -97.3300 251.000 30.0 90.564 4.070 -999.990 -999.990 0.906 ..P WKT 2010 06 13 10 24 55 31.3200 -97.3300 251.000 122.0 98.452 5.690 -999.990 -999.990 0.985 ..P WKT 2010 06 13 10 29 55 31.3200 -97.3300 251.000 457.0 102.011 4.490 -999.990 -999.990 1.020 ..P WKT 2010 06 13 10 34 55 31.3200 -97.3300 251.000 30.0 91.892 4.140 -999.990 -999.990 0.919 ..P WKT 2010 06 13 10 39 55 31.3200 -97.3300 251.000 122.0 93.498 4.340 -999.990 -999.990 0.935 ..P WKT 2010 06 13 10 44 55 31.3200 -97.3300 251.000 457.0 97.616 4.520 -999.990 -999.990 0.976 ..P WKT 2010 06 13 10 54 55 31.3200 -97.3300 251.000 30.0 90.401 5.210 -999.990 -999.990 0.904 ..P WKT 2010 06 13 10 59 55 31.3200 -97.3300 251.000 122.0 93.581 5.280 -999.990 -999.990 0.936 ..P WKT 2010 06 13 11 04 55 31.3200 -97.3300 251.000 457.0 97.738 5.740 -999.990 -999.990 0.977 ..P WKT 2010 06 13 11 09 55 31.3200 -97.3300 251.000 30.0 95.337 6.230 -999.990 -999.990 0.953 ..P WKT 2010 06 13 11 14 55 31.3200 -97.3300 251.000 122.0 94.470 6.540 -999.990 -999.990 0.945 ..P WKT 2010 06 13 11 19 55 31.3200 -97.3300 251.000 457.0 97.928 6.960 -999.990 -999.990 0.979 ..P WKT 2010 06 13 11 29 55 31.3200 -97.3300 251.000 30.0 94.470 7.130 -999.990 -999.990 0.945 ..P WKT 2010 06 13 11 34 55 31.3200 -97.3300 251.000 122.0 100.525 6.740 -999.990 -999.990 1.005 ..P WKT 2010 06 13 11 39 55 31.3200 -97.3300 251.000 457.0 102.535 6.140 -999.990 -999.990 1.025 ..P WKT 2010 06 13 11 44 55 31.3200 -97.3300 251.000 30.0 95.760 6.260 -999.990 -999.990 0.958 ..P WKT 2010 06 13 11 49 55 31.3200 -97.3300 251.000 122.0 94.284 5.930 -999.990 -999.990 0.943 ..P WKT 2010 06 13 12 09 55 31.3200 -97.3300 251.000 457.0 92.567 4.570 -999.990 -999.990 0.926 ..P WKT 2010 06 13 12 10 25 31.3200 -97.3300 251.000 457.0 99.512 4.870 -999.990 -999.990 0.995 ..P WKT 2010 06 13 12 10 55 31.3200 -97.3300 251.000 457.0 98.508 4.360 -999.990 -999.990 0.985 ..P WKT 2010 06 13 12 11 25 31.3200 -97.3300 251.000 457.0 102.665 4.880 -999.990 -999.990 1.027 ..P WKT 2010 06 13 12 11 55 31.3200 -97.3300 251.000 457.0 101.941 4.630 -999.990 -999.990 1.019 ..P WKT 2010 06 13 12 12 25 31.3200 -97.3300 251.000 457.0 96.614 4.760 -999.990 -999.990 0.966 ..P WKT 2010 06 13 12 12 55 31.3200 -97.3300 251.000 457.0 97.981 5.050 -999.990 -999.990 0.980 ..P WKT 2010 06 13 12 13 25 31.3200 -97.3300 251.000 457.0 98.093 4.930 -999.990 -999.990 0.981 ..P WKT 2010 06 13 12 13 55 31.3200 -97.3300 251.000 457.0 104.202 5.520 -999.990 -999.990 1.042 ..P WKT 2010 06 13 12 14 25 31.3200 -97.3300 251.000 457.0 99.294 4.300 -999.990 -999.990 0.993 ..P WKT 2010 06 13 12 14 55 31.3200 -97.3300 251.000 457.0 97.872 4.950 -999.990 -999.990 0.979 ..P WKT 2010 06 13 12 19 55 31.3200 -97.3300 251.000 30.0 101.086 4.600 -999.990 -999.990 1.011 ..P WKT 2010 06 13 12 24 55 31.3200 -97.3300 251.000 122.0 103.743 4.590 -999.990 -999.990 1.037 ..P WKT 2010 06 13 12 29 55 31.3200 -97.3300 251.000 457.0 102.215 4.700 -999.990 -999.990 1.022 ..P WKT 2010 06 13 12 34 55 31.3200 -97.3300 251.000 30.0 93.569 5.360 -999.990 -999.990 0.936 ..P WKT 2010 06 13 12 39 55 31.3200 -97.3300 251.000 122.0 103.903 4.870 -999.990 -999.990 1.039 ..P WKT 2010 06 13 12 44 55 31.3200 -97.3300 251.000 457.0 98.325 5.030 -999.990 -999.990 0.983 ..P WKT 2010 06 13 12 54 55 31.3200 -97.3300 251.000 30.0 100.372 5.030 -999.990 -999.990 1.004 ..P WKT 2010 06 13 12 59 55 31.3200 -97.3300 251.000 122.0 97.945 4.500 -999.990 -999.990 0.979 ..P WKT 2010 06 13 13 04 55 31.3200 -97.3300 251.000 457.0 102.500 4.370 -999.990 -999.990 1.025 ..P WKT 2010 06 13 13 09 55 31.3200 -97.3300 251.000 30.0 91.410 4.530 -999.990 -999.990 0.914 ..P WKT 2010 06 13 13 14 55 31.3200 -97.3300 251.000 122.0 99.598 4.630 -999.990 -999.990 0.996 ..P WKT 2010 06 13 13 19 55 31.3200 -97.3300 251.000 457.0 100.243 4.510 -999.990 -999.990 1.002 ..P WKT 2010 06 13 13 29 55 31.3200 -97.3300 251.000 30.0 96.862 4.620 -999.990 -999.990 0.969 ..P WKT 2010 06 13 13 34 55 31.3200 -97.3300 251.000 122.0 106.254 4.630 -999.990 -999.990 1.063 ..P WKT 2010 06 13 13 39 55 31.3200 -97.3300 251.000 457.0 98.031 4.610 -999.990 -999.990 0.980 ..P WKT 2010 06 13 13 44 55 31.3200 -97.3300 251.000 30.0 94.561 5.700 -999.990 -999.990 0.946 ..P WKT 2010 06 13 13 49 55 31.3200 -97.3300 251.000 122.0 104.237 5.260 -999.990 -999.990 1.042 ..P WKT 2010 06 13 13 54 55 31.3200 -97.3300 251.000 457.0 95.451 5.320 -999.990 -999.990 0.955 ..P WKT 2010 06 13 14 04 55 31.3200 -97.3300 251.000 30.0 91.565 5.570 -999.990 -999.990 0.916 ..P WKT 2010 06 13 14 09 55 31.3200 -97.3300 251.000 122.0 97.027 6.000 -999.990 -999.990 0.970 ..P WKT 2010 06 13 14 14 55 31.3200 -97.3300 251.000 457.0 88.775 5.510 -999.990 -999.990 0.888 ..P WKT 2010 06 13 14 19 55 31.3200 -97.3300 251.000 30.0 93.399 7.260 -999.990 -999.990 0.934 ..P WKT 2010 06 13 14 24 55 31.3200 -97.3300 251.000 122.0 97.744 6.290 -999.990 -999.990 0.977 ..P WKT 2010 06 13 14 29 55 31.3200 -97.3300 251.000 457.0 87.809 5.550 -999.990 -999.990 0.878 ..P WKT 2010 06 13 14 39 55 31.3200 -97.3300 251.000 30.0 95.881 6.050 -999.990 -999.990 0.959 ..P WKT 2010 06 13 14 44 55 31.3200 -97.3300 251.000 122.0 93.865 5.750 -999.990 -999.990 0.939 ..P WKT 2010 06 13 14 49 55 31.3200 -97.3300 251.000 457.0 87.506 5.680 -999.990 -999.990 0.875 ..P WKT 2010 06 13 14 54 55 31.3200 -97.3300 251.000 30.0 87.730 6.100 -999.990 -999.990 0.877 ..P WKT 2010 06 13 14 59 55 31.3200 -97.3300 251.000 122.0 97.626 6.060 -999.990 -999.990 0.976 ..P WKT 2010 06 13 15 04 55 31.3200 -97.3300 251.000 457.0 87.619 6.160 -999.990 -999.990 0.876 ..P WKT 2010 06 13 15 14 55 31.3200 -97.3300 251.000 30.0 91.774 6.150 -999.990 -999.990 0.918 ..P WKT 2010 06 13 15 19 55 31.3200 -97.3300 251.000 122.0 99.072 5.820 -999.990 -999.990 0.991 ..P WKT 2010 06 13 15 24 55 31.3200 -97.3300 251.000 457.0 93.467 5.450 -999.990 -999.990 0.935 ..P WKT 2010 06 13 15 29 55 31.3200 -97.3300 251.000 30.0 89.685 5.340 -999.990 -999.990 0.897 ..P WKT 2010 06 13 15 34 55 31.3200 -97.3300 251.000 122.0 100.071 5.880 -999.990 -999.990 1.001 ..P WKT 2010 06 13 15 39 55 31.3200 -97.3300 251.000 457.0 83.942 5.440 -999.990 -999.990 0.839 ..P WKT 2010 06 13 15 49 55 31.3200 -97.3300 251.000 30.0 86.276 5.270 -999.990 -999.990 0.863 ..P WKT 2010 06 13 15 54 55 31.3200 -97.3300 251.000 122.0 94.782 5.450 -999.990 -999.990 0.948 ..P WKT 2010 06 13 15 59 55 31.3200 -97.3300 251.000 457.0 74.651 6.870 -999.990 -999.990 0.747 ..P WKT 2010 06 13 16 04 55 31.3200 -97.3300 251.000 30.0 92.145 5.220 -999.990 -999.990 0.921 ..P WKT 2010 06 13 16 09 55 31.3200 -97.3300 251.000 122.0 90.265 5.330 -999.990 -999.990 0.903 ..P WKT 2010 06 13 16 14 55 31.3200 -97.3300 251.000 457.0 91.192 5.930 -999.990 -999.990 0.912 ..P WKT 2010 06 13 16 24 55 31.3200 -97.3300 251.000 30.0 86.786 5.260 -999.990 -999.990 0.868 ..P WKT 2010 06 13 16 29 55 31.3200 -97.3300 251.000 122.0 93.395 5.740 -999.990 -999.990 0.934 ..P WKT 2010 06 13 16 34 55 31.3200 -97.3300 251.000 457.0 87.076 5.350 -999.990 -999.990 0.871 ..P WKT 2010 06 13 16 39 55 31.3200 -97.3300 251.000 30.0 90.032 5.060 -999.990 -999.990 0.900 ..P WKT 2010 06 13 16 44 55 31.3200 -97.3300 251.000 122.0 96.644 5.040 -999.990 -999.990 0.966 ..P WKT 2010 06 13 16 49 55 31.3200 -97.3300 251.000 457.0 87.792 4.970 -999.990 -999.990 0.878 ..P WKT 2010 06 13 17 04 55 31.3200 -97.3300 251.000 30.0 89.775 4.890 -999.990 -999.990 0.898 ..P WKT 2010 06 13 17 09 55 31.3200 -97.3300 251.000 122.0 90.412 5.110 -999.990 -999.990 0.904 ..P WKT 2010 06 13 17 14 55 31.3200 -97.3300 251.000 457.0 84.296 5.560 -999.990 -999.990 0.843 ..P WKT 2010 06 13 17 19 55 31.3200 -97.3300 251.000 30.0 84.934 5.140 -999.990 -999.990 0.849 ..P WKT 2010 06 13 17 24 55 31.3200 -97.3300 251.000 122.0 98.239 5.120 -999.990 -999.990 0.982 ..P WKT 2010 06 13 17 29 55 31.3200 -97.3300 251.000 457.0 88.743 4.800 -999.990 -999.990 0.887 ..P WKT 2010 06 13 17 39 55 31.3200 -97.3300 251.000 30.0 94.535 6.190 -999.990 -999.990 0.945 ..P WKT 2010 06 13 17 44 55 31.3200 -97.3300 251.000 122.0 92.086 5.160 -999.990 -999.990 0.921 ..P WKT 2010 06 13 17 49 55 31.3200 -97.3300 251.000 457.0 87.383 5.500 -999.990 -999.990 0.874 ..P WKT 2010 06 13 17 54 55 31.3200 -97.3300 251.000 30.0 89.440 5.430 -999.990 -999.990 0.894 ..P WKT 2010 06 13 17 59 55 31.3200 -97.3300 251.000 122.0 88.680 5.650 -999.990 -999.990 0.887 ..P WKT 2010 06 13 18 04 55 31.3200 -97.3300 251.000 457.0 78.901 5.910 -999.990 -999.990 0.789 ..P WKT 2010 06 13 18 14 55 31.3200 -97.3300 251.000 30.0 85.834 6.440 -999.990 -999.990 0.858 ..P WKT 2010 06 13 18 19 55 31.3200 -97.3300 251.000 122.0 89.020 6.130 -999.990 -999.990 0.890 ..P WKT 2010 06 13 18 24 55 31.3200 -97.3300 251.000 457.0 87.555 6.040 -999.990 -999.990 0.876 ..P WKT 2010 06 13 18 29 55 31.3200 -97.3300 251.000 30.0 83.268 5.760 -999.990 -999.990 0.833 ..P WKT 2010 06 13 18 34 55 31.3200 -97.3300 251.000 122.0 87.865 5.640 -999.990 -999.990 0.879 ..P WKT 2010 06 13 18 39 55 31.3200 -97.3300 251.000 457.0 86.257 5.630 -999.990 -999.990 0.863 ..P WKT 2010 06 13 18 49 55 31.3200 -97.3300 251.000 30.0 81.892 5.550 -999.990 -999.990 0.819 ..P WKT 2010 06 13 18 54 55 31.3200 -97.3300 251.000 122.0 92.258 5.740 -999.990 -999.990 0.923 ..P WKT 2010 06 13 18 59 55 31.3200 -97.3300 251.000 457.0 79.903 6.250 -999.990 -999.990 0.799 ..P WKT 2010 06 13 19 04 55 31.3200 -97.3300 251.000 30.0 79.685 6.450 -999.990 -999.990 0.797 ..P WKT 2010 06 13 19 09 55 31.3200 -97.3300 251.000 122.0 96.267 6.480 -999.990 -999.990 0.963 ..P WKT 2010 06 13 19 14 55 31.3200 -97.3300 251.000 457.0 78.401 6.530 -999.990 -999.990 0.784 ..P WKT 2010 06 13 19 24 55 31.3200 -97.3300 251.000 30.0 94.226 6.880 -999.990 -999.990 0.942 ..P WKT 2010 06 13 19 29 55 31.3200 -97.3300 251.000 122.0 96.997 6.380 -999.990 -999.990 0.970 ..P WKT 2010 06 13 19 34 55 31.3200 -97.3300 251.000 457.0 89.453 6.980 -999.990 -999.990 0.895 ..P WKT 2010 06 13 19 39 55 31.3200 -97.3300 251.000 30.0 88.408 6.140 -999.990 -999.990 0.884 ..P WKT 2010 06 13 19 44 55 31.3200 -97.3300 251.000 122.0 91.320 6.920 -999.990 -999.990 0.913 ..P WKT 2010 06 13 19 49 55 31.3200 -97.3300 251.000 457.0 87.589 6.290 -999.990 -999.990 0.876 ..P WKT 2010 06 13 19 59 55 31.3200 -97.3300 251.000 30.0 85.033 6.440 -999.990 -999.990 0.850 ..P WKT 2010 06 13 20 04 55 31.3200 -97.3300 251.000 122.0 92.149 5.980 -999.990 -999.990 0.921 ..P WKT 2010 06 13 20 09 55 31.3200 -97.3300 251.000 457.0 89.648 6.330 -999.990 -999.990 0.896 ..P WKT 2010 06 13 20 14 55 31.3200 -97.3300 251.000 30.0 88.986 6.050 -999.990 -999.990 0.890 ..P WKT 2010 06 13 20 19 55 31.3200 -97.3300 251.000 122.0 90.870 6.610 -999.990 -999.990 0.909 ..P WKT 2010 06 13 20 24 55 31.3200 -97.3300 251.000 457.0 85.398 5.860 -999.990 -999.990 0.854 ..P WKT 2010 06 13 20 34 55 31.3200 -97.3300 251.000 30.0 86.477 5.920 -999.990 -999.990 0.865 ..P WKT 2010 06 13 20 39 55 31.3200 -97.3300 251.000 122.0 97.281 6.160 -999.990 -999.990 0.973 ..P WKT 2010 06 13 20 44 55 31.3200 -97.3300 251.000 457.0 88.549 6.540 -999.990 -999.990 0.885 ..P WKT 2010 06 13 20 49 55 31.3200 -97.3300 251.000 30.0 88.311 7.360 -999.990 -999.990 0.883 ..P WKT 2010 06 13 20 54 55 31.3200 -97.3300 251.000 122.0 98.553 6.410 -999.990 -999.990 0.986 ..P WKT 2010 06 13 20 59 55 31.3200 -97.3300 251.000 457.0 88.967 5.740 -999.990 -999.990 0.890 ..P WKT 2010 06 13 21 09 55 31.3200 -97.3300 251.000 30.0 87.843 5.540 -999.990 -999.990 0.878 ..P WKT 2010 06 13 21 14 55 31.3200 -97.3300 251.000 122.0 96.027 6.380 -999.990 -999.990 0.960 ..P WKT 2010 06 13 21 19 55 31.3200 -97.3300 251.000 457.0 87.772 6.850 -999.990 -999.990 0.878 ..P WKT 2010 06 13 21 24 55 31.3200 -97.3300 251.000 30.0 89.436 8.190 -999.990 -999.990 0.894 ..P WKT 2010 06 13 21 29 55 31.3200 -97.3300 251.000 122.0 90.819 6.830 -999.990 -999.990 0.908 ..P WKT 2010 06 13 21 34 55 31.3200 -97.3300 251.000 457.0 85.112 5.850 -999.990 -999.990 0.851 ..P WKT 2010 06 13 21 44 55 31.3200 -97.3300 251.000 30.0 87.591 5.950 -999.990 -999.990 0.876 ..P WKT 2010 06 13 21 49 55 31.3200 -97.3300 251.000 122.0 94.648 6.860 -999.990 -999.990 0.946 ..P WKT 2010 06 13 21 54 55 31.3200 -97.3300 251.000 457.0 85.533 7.570 -999.990 -999.990 0.855 ..P WKT 2010 06 13 21 59 55 31.3200 -97.3300 251.000 30.0 85.213 6.970 -999.990 -999.990 0.852 ..P WKT 2010 06 13 22 04 55 31.3200 -97.3300 251.000 122.0 100.787 6.480 -999.990 -999.990 1.008 ..P WKT 2010 06 13 22 09 55 31.3200 -97.3300 251.000 457.0 92.237 5.760 -999.990 -999.990 0.922 ..P WKT 2010 06 13 22 19 55 31.3200 -97.3300 251.000 30.0 94.052 6.160 -999.990 -999.990 0.941 ..P WKT 2010 06 13 22 24 55 31.3200 -97.3300 251.000 122.0 99.454 6.100 -999.990 -999.990 0.995 ..P WKT 2010 06 13 22 29 55 31.3200 -97.3300 251.000 457.0 93.069 6.360 -999.990 -999.990 0.931 ..P WKT 2010 06 13 22 34 55 31.3200 -97.3300 251.000 30.0 91.227 6.190 -999.990 -999.990 0.912 ..P WKT 2010 06 13 22 39 55 31.3200 -97.3300 251.000 122.0 94.642 5.550 -999.990 -999.990 0.946 ..P WKT 2010 06 13 22 44 55 31.3200 -97.3300 251.000 457.0 89.533 5.800 -999.990 -999.990 0.895 ..P WKT 2010 06 13 22 54 55 31.3200 -97.3300 251.000 30.0 85.766 6.210 -999.990 -999.990 0.858 ..P WKT 2010 06 13 22 59 55 31.3200 -97.3300 251.000 122.0 101.610 5.720 -999.990 -999.990 1.016 ..P WKT 2010 06 13 23 04 55 31.3200 -97.3300 251.000 457.0 92.863 6.520 -999.990 -999.990 0.929 ..P WKT 2010 06 13 23 09 55 31.3200 -97.3300 251.000 30.0 90.796 6.260 -999.990 -999.990 0.908 ..P WKT 2010 06 13 23 14 55 31.3200 -97.3300 251.000 122.0 99.679 5.570 -999.990 -999.990 0.997 ..P WKT 2010 06 13 23 19 55 31.3200 -97.3300 251.000 457.0 92.351 5.470 -999.990 -999.990 0.924 ..P WKT 2010 06 13 23 29 55 31.3200 -97.3300 251.000 30.0 88.403 5.710 -999.990 -999.990 0.884 ..P WKT 2010 06 13 23 34 55 31.3200 -97.3300 251.000 122.0 100.325 6.060 -999.990 -999.990 1.003 ..P WKT 2010 06 13 23 39 55 31.3200 -97.3300 251.000 457.0 94.460 5.680 -999.990 -999.990 0.945 ..P WKT 2010 06 13 23 44 55 31.3200 -97.3300 251.000 30.0 95.711 6.380 -999.990 -999.990 0.957 ..P WKT 2010 06 13 23 49 55 31.3200 -97.3300 251.000 122.0 99.383 6.030 -999.990 -999.990 0.994 ..P WKT 2010 06 14 00 09 55 31.3200 -97.3300 251.000 457.0 90.192 6.010 -999.990 -999.990 0.902 ..P WKT 2010 06 14 00 10 25 31.3200 -97.3300 251.000 457.0 90.990 6.450 -999.990 -999.990 0.910 ..P WKT 2010 06 14 00 10 55 31.3200 -97.3300 251.000 457.0 93.636 6.530 -999.990 -999.990 0.936 ..P WKT 2010 06 14 00 11 25 31.3200 -97.3300 251.000 457.0 87.033 6.150 -999.990 -999.990 0.870 ..P WKT 2010 06 14 00 11 55 31.3200 -97.3300 251.000 457.0 89.823 5.940 -999.990 -999.990 0.898 ..P WKT 2010 06 14 00 12 25 31.3200 -97.3300 251.000 457.0 86.350 6.320 -999.990 -999.990 0.863 ..P WKT 2010 06 14 00 12 55 31.3200 -97.3300 251.000 457.0 84.728 5.900 -999.990 -999.990 0.847 ..P WKT 2010 06 14 00 13 25 31.3200 -97.3300 251.000 457.0 84.245 5.990 -999.990 -999.990 0.842 ..P WKT 2010 06 14 00 13 55 31.3200 -97.3300 251.000 457.0 86.750 6.000 -999.990 -999.990 0.868 ..P WKT 2010 06 14 00 14 25 31.3200 -97.3300 251.000 457.0 87.262 6.170 -999.990 -999.990 0.873 ..P WKT 2010 06 14 00 14 55 31.3200 -97.3300 251.000 457.0 88.059 6.020 -999.990 -999.990 0.881 ..P WKT 2010 06 14 00 19 55 31.3200 -97.3300 251.000 30.0 88.631 6.250 -999.990 -999.990 0.886 ..P WKT 2010 06 14 00 24 55 31.3200 -97.3300 251.000 122.0 94.891 6.140 -999.990 -999.990 0.949 ..P WKT 2010 06 14 00 29 55 31.3200 -97.3300 251.000 457.0 88.918 7.870 -999.990 -999.990 0.889 ..P WKT 2010 06 14 00 34 55 31.3200 -97.3300 251.000 30.0 88.920 6.740 -999.990 -999.990 0.889 ..P WKT 2010 06 14 00 39 55 31.3200 -97.3300 251.000 122.0 97.451 6.450 -999.990 -999.990 0.975 ..P WKT 2010 06 14 00 44 55 31.3200 -97.3300 251.000 457.0 90.345 6.450 -999.990 -999.990 0.903 ..P WKT 2010 06 14 00 54 55 31.3200 -97.3300 251.000 30.0 84.179 6.420 -999.990 -999.990 0.842 ..P WKT 2010 06 14 00 59 55 31.3200 -97.3300 251.000 122.0 86.820 6.240 -999.990 -999.990 0.868 ..P WKT 2010 06 14 01 04 55 31.3200 -97.3300 251.000 457.0 86.619 6.570 -999.990 -999.990 0.866 ..P WKT 2010 06 14 01 09 55 31.3200 -97.3300 251.000 30.0 84.148 5.940 -999.990 -999.990 0.841 ..P WKT 2010 06 14 01 14 55 31.3200 -97.3300 251.000 122.0 92.747 6.290 -999.990 -999.990 0.927 ..P WKT 2010 06 14 01 19 55 31.3200 -97.3300 251.000 457.0 89.992 5.920 -999.990 -999.990 0.900 ..P WKT 2010 06 14 01 29 55 31.3200 -97.3300 251.000 30.0 88.698 5.880 -999.990 -999.990 0.887 ..P WKT 2010 06 14 01 34 55 31.3200 -97.3300 251.000 122.0 95.830 5.500 -999.990 -999.990 0.958 ..P WKT 2010 06 14 01 39 55 31.3200 -97.3300 251.000 457.0 88.784 8.450 -999.990 -999.990 0.888 ..P WKT 2010 06 14 01 44 55 31.3200 -97.3300 251.000 30.0 97.046 5.330 -999.990 -999.990 0.970 ..P WKT 2010 06 14 01 49 55 31.3200 -97.3300 251.000 122.0 93.120 5.560 -999.990 -999.990 0.931 ..P WKT 2010 06 14 01 54 55 31.3200 -97.3300 251.000 457.0 90.894 5.250 -999.990 -999.990 0.909 ..P WKT 2010 06 14 02 04 55 31.3200 -97.3300 251.000 30.0 81.491 4.980 -999.990 -999.990 0.815 ..P WKT 2010 06 14 02 09 55 31.3200 -97.3300 251.000 122.0 88.188 5.020 -999.990 -999.990 0.882 ..P WKT 2010 06 14 02 14 55 31.3200 -97.3300 251.000 457.0 91.345 5.180 -999.990 -999.990 0.913 ..P WKT 2010 06 14 02 19 55 31.3200 -97.3300 251.000 30.0 92.094 5.550 -999.990 -999.990 0.921 ..P WKT 2010 06 14 02 24 55 31.3200 -97.3300 251.000 122.0 100.059 5.540 -999.990 -999.990 1.001 ..P WKT 2010 06 14 02 29 55 31.3200 -97.3300 251.000 457.0 86.520 5.160 -999.990 -999.990 0.865 ..P WKT 2010 06 14 02 39 55 31.3200 -97.3300 251.000 30.0 87.575 5.240 -999.990 -999.990 0.876 ..P WKT 2010 06 14 02 44 55 31.3200 -97.3300 251.000 122.0 92.968 5.870 -999.990 -999.990 0.930 ..P WKT 2010 06 14 02 49 55 31.3200 -97.3300 251.000 457.0 95.109 5.900 -999.990 -999.990 0.951 ..P WKT 2010 06 14 02 54 55 31.3200 -97.3300 251.000 30.0 90.468 4.910 -999.990 -999.990 0.905 ..P WKT 2010 06 14 02 59 55 31.3200 -97.3300 251.000 122.0 86.675 5.310 -999.990 -999.990 0.867 ..P WKT 2010 06 14 03 04 55 31.3200 -97.3300 251.000 457.0 85.992 5.230 -999.990 -999.990 0.860 ..P WKT 2010 06 14 03 14 55 31.3200 -97.3300 251.000 30.0 87.167 4.980 -999.990 -999.990 0.872 ..P WKT 2010 06 14 03 19 55 31.3200 -97.3300 251.000 122.0 88.177 5.040 -999.990 -999.990 0.882 ..P WKT 2010 06 14 03 24 55 31.3200 -97.3300 251.000 457.0 90.034 5.160 -999.990 -999.990 0.900 ..P WKT 2010 06 14 03 29 55 31.3200 -97.3300 251.000 30.0 85.965 5.670 -999.990 -999.990 0.860 ..P WKT 2010 06 14 03 34 55 31.3200 -97.3300 251.000 122.0 93.039 5.540 -999.990 -999.990 0.930 ..P WKT 2010 06 14 03 39 55 31.3200 -97.3300 251.000 457.0 89.394 5.090 -999.990 -999.990 0.894 ..P WKT 2010 06 14 03 49 55 31.3200 -97.3300 251.000 30.0 91.814 5.490 -999.990 -999.990 0.918 ..P WKT 2010 06 14 03 54 55 31.3200 -97.3300 251.000 122.0 89.420 5.540 -999.990 -999.990 0.894 ..P WKT 2010 06 14 03 59 55 31.3200 -97.3300 251.000 457.0 85.477 5.800 -999.990 -999.990 0.855 ..P WKT 2010 06 14 04 04 55 31.3200 -97.3300 251.000 30.0 88.720 6.070 -999.990 -999.990 0.887 ..P WKT 2010 06 14 04 09 55 31.3200 -97.3300 251.000 122.0 86.046 5.620 -999.990 -999.990 0.860 ..P WKT 2010 06 14 04 14 55 31.3200 -97.3300 251.000 457.0 85.345 6.490 -999.990 -999.990 0.853 ..P WKT 2010 06 14 04 24 55 31.3200 -97.3300 251.000 30.0 83.059 4.850 -999.990 -999.990 0.831 ..P WKT 2010 06 14 04 29 55 31.3200 -97.3300 251.000 122.0 93.433 5.750 -999.990 -999.990 0.934 ..P WKT 2010 06 14 04 34 55 31.3200 -97.3300 251.000 457.0 89.174 5.980 -999.990 -999.990 0.892 ..P WKT 2010 06 14 04 39 55 31.3200 -97.3300 251.000 30.0 93.074 6.110 -999.990 -999.990 0.931 ..P WKT 2010 06 14 04 44 55 31.3200 -97.3300 251.000 122.0 98.096 5.480 -999.990 -999.990 0.981 ..P WKT 2010 06 14 04 49 55 31.3200 -97.3300 251.000 457.0 89.622 4.880 -999.990 -999.990 0.896 ..P WKT 2010 06 14 05 04 55 31.3200 -97.3300 251.000 30.0 92.888 5.800 -999.990 -999.990 0.929 ..P WKT 2010 06 14 05 09 55 31.3200 -97.3300 251.000 122.0 101.562 5.800 -999.990 -999.990 1.016 ..P WKT 2010 06 14 05 14 55 31.3200 -97.3300 251.000 457.0 82.712 5.870 -999.990 -999.990 0.827 ..P WKT 2010 06 14 05 19 55 31.3200 -97.3300 251.000 30.0 93.629 4.790 -999.990 -999.990 0.936 ..P WKT 2010 06 14 05 24 55 31.3200 -97.3300 251.000 122.0 98.647 4.930 -999.990 -999.990 0.986 ..P WKT 2010 06 14 05 29 55 31.3200 -97.3300 251.000 457.0 89.071 4.540 -999.990 -999.990 0.891 ..P WKT 2010 06 14 05 39 55 31.3200 -97.3300 251.000 30.0 93.608 4.950 -999.990 -999.990 0.936 ..P WKT 2010 06 14 05 44 55 31.3200 -97.3300 251.000 122.0 95.933 4.480 -999.990 -999.990 0.959 ..P WKT 2010 06 14 05 49 55 31.3200 -97.3300 251.000 457.0 92.088 4.930 -999.990 -999.990 0.921 ..P WKT 2010 06 14 05 54 55 31.3200 -97.3300 251.000 30.0 89.647 6.020 -999.990 -999.990 0.896 ..P WKT 2010 06 14 05 59 55 31.3200 -97.3300 251.000 122.0 96.735 4.390 -999.990 -999.990 0.967 ..P WKT 2010 06 14 06 04 55 31.3200 -97.3300 251.000 457.0 91.492 4.750 -999.990 -999.990 0.915 ..P WKT 2010 06 14 06 14 55 31.3200 -97.3300 251.000 30.0 85.474 5.960 -999.990 -999.990 0.855 ..P WKT 2010 06 14 06 19 55 31.3200 -97.3300 251.000 122.0 97.857 4.380 -999.990 -999.990 0.979 ..P WKT 2010 06 14 06 24 55 31.3200 -97.3300 251.000 457.0 87.279 4.620 -999.990 -999.990 0.873 ..P WKT 2010 06 14 06 29 55 31.3200 -97.3300 251.000 30.0 93.219 4.870 -999.990 -999.990 0.932 ..P WKT 2010 06 14 06 34 55 31.3200 -97.3300 251.000 122.0 92.161 4.300 -999.990 -999.990 0.922 ..P WKT 2010 06 14 06 39 55 31.3200 -97.3300 251.000 457.0 86.627 5.300 -999.990 -999.990 0.866 ..P WKT 2010 06 14 06 49 55 31.3200 -97.3300 251.000 30.0 88.011 4.190 -999.990 -999.990 0.880 ..P WKT 2010 06 14 06 54 55 31.3200 -97.3300 251.000 122.0 98.556 4.450 -999.990 -999.990 0.986 ..P WKT 2010 06 14 06 59 55 31.3200 -97.3300 251.000 457.0 91.908 4.720 -999.990 -999.990 0.919 ..P WKT 2010 06 14 07 04 55 31.3200 -97.3300 251.000 30.0 90.712 3.990 -999.990 -999.990 0.907 ..P WKT 2010 06 14 07 09 55 31.3200 -97.3300 251.000 122.0 91.192 4.100 -999.990 -999.990 0.912 ..P WKT 2010 06 14 07 14 55 31.3200 -97.3300 251.000 457.0 90.555 4.140 -999.990 -999.990 0.906 ..P WKT 2010 06 14 07 24 55 31.3200 -97.3300 251.000 30.0 102.324 4.860 -999.990 -999.990 1.023 ..P WKT 2010 06 14 07 29 55 31.3200 -97.3300 251.000 122.0 91.558 4.570 -999.990 -999.990 0.916 ..P WKT 2010 06 14 07 34 55 31.3200 -97.3300 251.000 457.0 86.935 4.020 -999.990 -999.990 0.869 ..P WKT 2010 06 14 07 39 55 31.3200 -97.3300 251.000 30.0 91.381 4.210 -999.990 -999.990 0.914 ..P WKT 2010 06 14 07 44 55 31.3200 -97.3300 251.000 122.0 93.735 4.530 -999.990 -999.990 0.937 ..P WKT 2010 06 14 07 49 55 31.3200 -97.3300 251.000 457.0 92.042 3.870 -999.990 -999.990 0.920 ..P WKT 2010 06 14 07 59 55 31.3200 -97.3300 251.000 30.0 84.638 4.610 -999.990 -999.990 0.846 ..P WKT 2010 06 14 08 04 55 31.3200 -97.3300 251.000 122.0 92.166 3.770 -999.990 -999.990 0.922 ..P WKT 2010 06 14 08 09 55 31.3200 -97.3300 251.000 457.0 88.545 3.540 -999.990 -999.990 0.885 ..P WKT 2010 06 14 08 14 55 31.3200 -97.3300 251.000 30.0 88.826 3.560 -999.990 -999.990 0.888 ..P WKT 2010 06 14 08 19 55 31.3200 -97.3300 251.000 122.0 88.271 4.230 -999.990 -999.990 0.883 ..P WKT 2010 06 14 08 24 55 31.3200 -97.3300 251.000 457.0 82.982 3.360 -999.990 -999.990 0.830 ..P WKT 2010 06 14 08 34 55 31.3200 -97.3300 251.000 30.0 83.865 3.500 -999.990 -999.990 0.839 ..P WKT 2010 06 14 08 39 55 31.3200 -97.3300 251.000 122.0 88.360 3.470 -999.990 -999.990 0.884 ..P WKT 2010 06 14 08 44 55 31.3200 -97.3300 251.000 457.0 89.793 5.190 -999.990 -999.990 0.898 ..P WKT 2010 06 14 08 49 55 31.3200 -97.3300 251.000 30.0 85.384 3.440 -999.990 -999.990 0.854 ..P WKT 2010 06 14 08 54 55 31.3200 -97.3300 251.000 122.0 94.048 4.390 -999.990 -999.990 0.940 ..P WKT 2010 06 14 08 59 55 31.3200 -97.3300 251.000 457.0 85.470 3.200 -999.990 -999.990 0.855 ..P WKT 2010 06 14 09 09 55 31.3200 -97.3300 251.000 30.0 86.588 3.560 -999.990 -999.990 0.866 ..P WKT 2010 06 14 09 14 55 31.3200 -97.3300 251.000 122.0 87.384 3.470 -999.990 -999.990 0.874 ..P WKT 2010 06 14 09 19 55 31.3200 -97.3300 251.000 457.0 86.791 3.280 -999.990 -999.990 0.868 ..P WKT 2010 06 14 09 24 55 31.3200 -97.3300 251.000 30.0 94.252 3.870 -999.990 -999.990 0.943 ..P WKT 2010 06 14 09 29 55 31.3200 -97.3300 251.000 122.0 96.156 3.380 -999.990 -999.990 0.962 ..P WKT 2010 06 14 09 34 55 31.3200 -97.3300 251.000 457.0 82.793 3.740 -999.990 -999.990 0.828 ..P WKT 2010 06 14 09 44 55 31.3200 -97.3300 251.000 30.0 90.015 3.390 -999.990 -999.990 0.900 ..P WKT 2010 06 14 09 49 55 31.3200 -97.3300 251.000 122.0 90.611 3.340 -999.990 -999.990 0.906 ..P WKT 2010 06 14 09 54 55 31.3200 -97.3300 251.000 457.0 77.895 3.450 -999.990 -999.990 0.779 ..P WKT 2010 06 14 09 59 55 31.3200 -97.3300 251.000 30.0 85.704 3.620 -999.990 -999.990 0.857 ..P WKT 2010 06 14 10 04 55 31.3200 -97.3300 251.000 122.0 90.736 3.950 -999.990 -999.990 0.907 ..P WKT 2010 06 14 10 09 55 31.3200 -97.3300 251.000 457.0 83.433 3.520 -999.990 -999.990 0.834 ..P WKT 2010 06 14 10 19 55 31.3200 -97.3300 251.000 30.0 92.304 3.200 -999.990 -999.990 0.923 ..P WKT 2010 06 14 10 24 55 31.3200 -97.3300 251.000 122.0 92.543 2.960 -999.990 -999.990 0.925 ..P WKT 2010 06 14 10 29 55 31.3200 -97.3300 251.000 457.0 89.321 2.930 -999.990 -999.990 0.893 ..P WKT 2010 06 14 10 34 55 31.3200 -97.3300 251.000 30.0 86.654 3.210 -999.990 -999.990 0.867 ..P WKT 2010 06 14 10 39 55 31.3200 -97.3300 251.000 122.0 94.366 3.070 -999.990 -999.990 0.944 ..P WKT 2010 06 14 10 44 55 31.3200 -97.3300 251.000 457.0 85.473 3.110 -999.990 -999.990 0.855 ..P WKT 2010 06 14 10 54 55 31.3200 -97.3300 251.000 30.0 86.072 2.990 -999.990 -999.990 0.861 ..P WKT 2010 06 14 10 59 55 31.3200 -97.3300 251.000 122.0 88.642 3.020 -999.990 -999.990 0.886 ..P WKT 2010 06 14 11 04 55 31.3200 -97.3300 251.000 457.0 83.333 3.250 -999.990 -999.990 0.833 ..P WKT 2010 06 14 11 09 55 31.3200 -97.3300 251.000 30.0 83.554 3.880 -999.990 -999.990 0.836 ..P WKT 2010 06 14 11 14 55 31.3200 -97.3300 251.000 122.0 85.017 3.570 -999.990 -999.990 0.850 ..P WKT 2010 06 14 11 19 55 31.3200 -97.3300 251.000 457.0 87.724 3.870 -999.990 -999.990 0.877 ..P WKT 2010 06 14 11 29 55 31.3200 -97.3300 251.000 30.0 80.749 3.830 -999.990 -999.990 0.807 ..P WKT 2010 06 14 11 34 55 31.3200 -97.3300 251.000 122.0 92.745 3.820 -999.990 -999.990 0.927 ..P WKT 2010 06 14 11 39 55 31.3200 -97.3300 251.000 457.0 83.483 3.620 -999.990 -999.990 0.835 ..P WKT 2010 06 14 11 44 55 31.3200 -97.3300 251.000 30.0 89.126 4.550 -999.990 -999.990 0.891 ..P WKT 2010 06 14 11 49 55 31.3200 -97.3300 251.000 122.0 93.250 3.140 -999.990 -999.990 0.932 ..P WKT 2010 06 14 12 09 55 31.3200 -97.3300 251.000 457.0 87.021 2.620 -999.990 -999.990 0.870 ..P WKT 2010 06 14 12 10 25 31.3200 -97.3300 251.000 457.0 89.257 2.890 -999.990 -999.990 0.893 ..P WKT 2010 06 14 12 10 55 31.3200 -97.3300 251.000 457.0 85.147 3.770 -999.990 -999.990 0.851 ..P WKT 2010 06 14 12 11 25 31.3200 -97.3300 251.000 457.0 84.900 3.880 -999.990 -999.990 0.849 ..P WKT 2010 06 14 12 11 55 31.3200 -97.3300 251.000 457.0 86.585 3.250 -999.990 -999.990 0.866 ..P WKT 2010 06 14 12 12 25 31.3200 -97.3300 251.000 457.0 82.751 2.650 -999.990 -999.990 0.828 ..P WKT 2010 06 14 12 12 55 31.3200 -97.3300 251.000 457.0 80.573 3.340 -999.990 -999.990 0.806 ..P WKT 2010 06 14 12 13 25 31.3200 -97.3300 251.000 457.0 85.845 3.470 -999.990 -999.990 0.858 ..P WKT 2010 06 14 12 13 55 31.3200 -97.3300 251.000 457.0 83.943 2.760 -999.990 -999.990 0.839 ..P WKT 2010 06 14 12 14 25 31.3200 -97.3300 251.000 457.0 88.663 2.610 -999.990 -999.990 0.887 ..P WKT 2010 06 14 12 14 55 31.3200 -97.3300 251.000 457.0 91.453 2.630 -999.990 -999.990 0.915 ..P WKT 2010 06 14 12 19 55 31.3200 -97.3300 251.000 30.0 93.126 3.590 -999.990 -999.990 0.931 ..P WKT 2010 06 14 12 24 55 31.3200 -97.3300 251.000 122.0 98.942 3.060 -999.990 -999.990 0.989 ..P WKT 2010 06 14 12 29 55 31.3200 -97.3300 251.000 457.0 92.609 3.310 -999.990 -999.990 0.926 ..P WKT 2010 06 14 12 34 55 31.3200 -97.3300 251.000 30.0 94.560 3.290 -999.990 -999.990 0.946 ..P WKT 2010 06 14 12 39 55 31.3200 -97.3300 251.000 122.0 95.131 3.680 -999.990 -999.990 0.951 ..P WKT 2010 06 14 12 44 55 31.3200 -97.3300 251.000 457.0 94.873 3.770 -999.990 -999.990 0.949 ..P WKT 2010 06 14 12 54 55 31.3200 -97.3300 251.000 30.0 93.013 3.800 -999.990 -999.990 0.930 ..P WKT 2010 06 14 12 59 55 31.3200 -97.3300 251.000 122.0 95.283 3.410 -999.990 -999.990 0.953 ..P WKT 2010 06 14 13 04 55 31.3200 -97.3300 251.000 457.0 94.511 3.800 -999.990 -999.990 0.945 ..P WKT 2010 06 14 13 09 55 31.3200 -97.3300 251.000 30.0 99.826 4.250 -999.990 -999.990 0.998 ..P WKT 2010 06 14 13 14 55 31.3200 -97.3300 251.000 122.0 97.117 3.950 -999.990 -999.990 0.971 ..P WKT 2010 06 14 13 19 55 31.3200 -97.3300 251.000 457.0 89.422 3.500 -999.990 -999.990 0.894 ..P WKT 2010 06 14 13 29 55 31.3200 -97.3300 251.000 30.0 89.495 6.450 -999.990 -999.990 0.895 ..P WKT 2010 06 14 13 34 55 31.3200 -97.3300 251.000 122.0 99.210 3.730 -999.990 -999.990 0.992 ..P WKT 2010 06 14 13 39 55 31.3200 -97.3300 251.000 457.0 85.926 5.130 -999.990 -999.990 0.859 ..P WKT 2010 06 14 13 44 55 31.3200 -97.3300 251.000 30.0 90.654 6.260 -999.990 -999.990 0.907 ..P WKT 2010 06 14 13 49 55 31.3200 -97.3300 251.000 122.0 101.210 5.050 -999.990 -999.990 1.012 ..P WKT 2010 06 14 13 54 55 31.3200 -97.3300 251.000 457.0 102.061 4.390 -999.990 -999.990 1.021 ..P WKT 2010 06 14 14 04 55 31.3200 -97.3300 251.000 30.0 88.344 4.080 -999.990 -999.990 0.883 ..P WKT 2010 06 14 14 09 55 31.3200 -97.3300 251.000 122.0 98.612 5.110 -999.990 -999.990 0.986 ..P WKT 2010 06 14 14 14 55 31.3200 -97.3300 251.000 457.0 88.894 5.640 -999.990 -999.990 0.889 ..P WKT 2010 06 14 14 19 55 31.3200 -97.3300 251.000 30.0 91.668 5.560 -999.990 -999.990 0.917 ..P WKT 2010 06 14 14 24 55 31.3200 -97.3300 251.000 122.0 90.415 4.840 -999.990 -999.990 0.904 ..P WKT 2010 06 14 14 29 55 31.3200 -97.3300 251.000 457.0 87.356 5.300 -999.990 -999.990 0.874 ..P WKT 2010 06 14 14 39 55 31.3200 -97.3300 251.000 30.0 90.486 4.370 -999.990 -999.990 0.905 ..P WKT 2010 06 14 14 44 55 31.3200 -97.3300 251.000 122.0 93.622 5.130 -999.990 -999.990 0.936 ..P WKT 2010 06 14 14 49 55 31.3200 -97.3300 251.000 457.0 87.858 5.520 -999.990 -999.990 0.879 ..P WKT 2010 06 14 14 54 55 31.3200 -97.3300 251.000 30.0 86.125 4.610 -999.990 -999.990 0.861 ..P WKT 2010 06 14 14 59 55 31.3200 -97.3300 251.000 122.0 97.194 3.190 -999.990 -999.990 0.972 ..P WKT 2010 06 14 15 04 55 31.3200 -97.3300 251.000 457.0 83.076 4.550 -999.990 -999.990 0.831 ..P WKT 2010 06 14 15 14 55 31.3200 -97.3300 251.000 30.0 84.857 4.240 -999.990 -999.990 0.849 ..P WKT 2010 06 14 15 19 55 31.3200 -97.3300 251.000 122.0 93.389 3.290 -999.990 -999.990 0.934 ..P WKT 2010 06 14 15 24 55 31.3200 -97.3300 251.000 457.0 93.427 4.590 -999.990 -999.990 0.934 ..P WKT 2010 06 14 15 29 55 31.3200 -97.3300 251.000 30.0 90.817 3.130 -999.990 -999.990 0.908 ..P WKT 2010 06 14 15 34 55 31.3200 -97.3300 251.000 122.0 94.757 3.770 -999.990 -999.990 0.948 ..P WKT 2010 06 14 15 39 55 31.3200 -97.3300 251.000 457.0 85.175 3.980 -999.990 -999.990 0.852 ..P WKT 2010 06 14 15 49 55 31.3200 -97.3300 251.000 30.0 96.885 3.780 -999.990 -999.990 0.969 ..P WKT 2010 06 14 15 54 55 31.3200 -97.3300 251.000 122.0 94.192 3.740 -999.990 -999.990 0.942 ..P WKT 2010 06 14 15 59 55 31.3200 -97.3300 251.000 457.0 88.289 3.890 -999.990 -999.990 0.883 ..P WKT 2010 06 14 16 04 55 31.3200 -97.3300 251.000 30.0 90.200 3.140 -999.990 -999.990 0.902 ..P WKT 2010 06 14 16 09 55 31.3200 -97.3300 251.000 122.0 95.464 3.050 -999.990 -999.990 0.955 ..P WKT 2010 06 14 16 14 55 31.3200 -97.3300 251.000 457.0 87.880 3.560 -999.990 -999.990 0.879 ..P WKT 2010 06 14 16 24 55 31.3200 -97.3300 251.000 30.0 89.769 3.850 -999.990 -999.990 0.898 ..P WKT 2010 06 14 16 29 55 31.3200 -97.3300 251.000 122.0 95.618 3.320 -999.990 -999.990 0.956 ..P WKT 2010 06 14 16 34 55 31.3200 -97.3300 251.000 457.0 90.283 4.500 -999.990 -999.990 0.903 ..P WKT 2010 06 14 16 39 55 31.3200 -97.3300 251.000 30.0 94.735 3.980 -999.990 -999.990 0.947 ..P WKT 2010 06 14 16 44 55 31.3200 -97.3300 251.000 122.0 100.869 3.960 -999.990 -999.990 1.009 ..P WKT 2010 06 14 16 49 55 31.3200 -97.3300 251.000 457.0 87.136 4.330 -999.990 -999.990 0.871 ..P WKT 2010 06 14 17 04 55 31.3200 -97.3300 251.000 30.0 86.515 3.930 -999.990 -999.990 0.865 ..P WKT 2010 06 14 17 09 55 31.3200 -97.3300 251.000 122.0 85.936 4.290 -999.990 -999.990 0.859 ..P WKT 2010 06 14 17 14 55 31.3200 -97.3300 251.000 457.0 81.714 4.400 -999.990 -999.990 0.817 ..P WKT 2010 06 14 17 19 55 31.3200 -97.3300 251.000 30.0 86.740 3.630 -999.990 -999.990 0.867 ..P WKT 2010 06 14 17 24 55 31.3200 -97.3300 251.000 122.0 96.252 4.620 -999.990 -999.990 0.963 ..P WKT 2010 06 14 17 29 55 31.3200 -97.3300 251.000 457.0 79.411 3.330 -999.990 -999.990 0.794 ..P WKT 2010 06 14 17 39 55 31.3200 -97.3300 251.000 30.0 86.940 3.620 -999.990 -999.990 0.869 ..P WKT 2010 06 14 17 44 55 31.3200 -97.3300 251.000 122.0 89.442 4.290 -999.990 -999.990 0.894 ..P WKT 2010 06 14 17 49 55 31.3200 -97.3300 251.000 457.0 88.857 3.380 -999.990 -999.990 0.889 ..P WKT 2010 06 14 17 54 55 31.3200 -97.3300 251.000 30.0 93.047 3.800 -999.990 -999.990 0.930 ..P WKT 2010 06 14 17 59 55 31.3200 -97.3300 251.000 122.0 86.564 4.360 -999.990 -999.990 0.866 ..P WKT 2010 06 14 18 04 55 31.3200 -97.3300 251.000 457.0 82.186 3.830 -999.990 -999.990 0.822 ..P WKT 2010 06 14 18 14 55 31.3200 -97.3300 251.000 30.0 89.143 4.090 -999.990 -999.990 0.891 ..P WKT 2010 06 14 18 19 55 31.3200 -97.3300 251.000 122.0 90.365 4.190 -999.990 -999.990 0.904 ..P WKT 2010 06 14 18 24 55 31.3200 -97.3300 251.000 457.0 86.666 4.060 -999.990 -999.990 0.867 ..P WKT 2010 06 14 18 29 55 31.3200 -97.3300 251.000 30.0 84.232 4.920 -999.990 -999.990 0.842 ..P WKT 2010 06 14 18 34 55 31.3200 -97.3300 251.000 122.0 88.407 4.480 -999.990 -999.990 0.884 ..P WKT 2010 06 14 18 39 55 31.3200 -97.3300 251.000 457.0 84.142 4.150 -999.990 -999.990 0.841 ..P WKT 2010 06 14 18 49 55 31.3200 -97.3300 251.000 30.0 80.634 4.360 -999.990 -999.990 0.806 ..P WKT 2010 06 14 18 54 55 31.3200 -97.3300 251.000 122.0 91.110 4.360 -999.990 -999.990 0.911 ..P WKT 2010 06 14 18 59 55 31.3200 -97.3300 251.000 457.0 83.280 4.700 -999.990 -999.990 0.833 ..P WKT 2010 06 14 19 04 55 31.3200 -97.3300 251.000 30.0 81.645 4.480 -999.990 -999.990 0.816 ..P WKT 2010 06 14 19 09 55 31.3200 -97.3300 251.000 122.0 92.693 4.600 -999.990 -999.990 0.927 ..P WKT 2010 06 14 19 14 55 31.3200 -97.3300 251.000 457.0 86.689 4.940 -999.990 -999.990 0.867 ..P WKT 2010 06 14 19 24 55 31.3200 -97.3300 251.000 30.0 90.329 6.130 -999.990 -999.990 0.903 ..P WKT 2010 06 14 19 29 55 31.3200 -97.3300 251.000 122.0 97.299 5.020 -999.990 -999.990 0.973 ..P WKT 2010 06 14 19 34 55 31.3200 -97.3300 251.000 457.0 93.972 4.680 -999.990 -999.990 0.940 ..P WKT 2010 06 14 19 39 55 31.3200 -97.3300 251.000 30.0 94.172 4.460 -999.990 -999.990 0.942 ..P WKT 2010 06 14 19 44 55 31.3200 -97.3300 251.000 122.0 93.666 4.170 -999.990 -999.990 0.937 ..P WKT 2010 06 14 19 49 55 31.3200 -97.3300 251.000 457.0 95.984 4.620 -999.990 -999.990 0.960 ..P WKT 2010 06 14 19 59 55 31.3200 -97.3300 251.000 30.0 90.148 5.730 -999.990 -999.990 0.901 ..P WKT 2010 06 14 20 04 55 31.3200 -97.3300 251.000 122.0 99.796 3.870 -999.990 -999.990 0.998 ..P WKT 2010 06 14 20 09 55 31.3200 -97.3300 251.000 457.0 88.809 3.880 -999.990 -999.990 0.888 ..P WKT 2010 06 14 20 14 55 31.3200 -97.3300 251.000 30.0 88.564 3.590 -999.990 -999.990 0.886 ..P WKT 2010 06 14 20 19 55 31.3200 -97.3300 251.000 122.0 84.357 3.460 -999.990 -999.990 0.844 ..P WKT 2010 06 14 20 24 55 31.3200 -97.3300 251.000 457.0 83.544 3.720 -999.990 -999.990 0.835 ..P WKT 2010 06 14 20 34 55 31.3200 -97.3300 251.000 30.0 93.020 3.580 -999.990 -999.990 0.930 ..P WKT 2010 06 14 20 39 55 31.3200 -97.3300 251.000 122.0 94.534 4.210 -999.990 -999.990 0.945 ..P WKT 2010 06 14 20 44 55 31.3200 -97.3300 251.000 457.0 92.368 4.390 -999.990 -999.990 0.924 ..P WKT 2010 06 14 20 49 55 31.3200 -97.3300 251.000 30.0 91.617 4.090 -999.990 -999.990 0.916 ..P WKT 2010 06 14 20 54 55 31.3200 -97.3300 251.000 122.0 93.132 4.360 -999.990 -999.990 0.931 ..P WKT 2010 06 14 20 59 55 31.3200 -97.3300 251.000 457.0 88.129 4.570 -999.990 -999.990 0.881 ..P WKT 2010 06 14 21 09 55 31.3200 -97.3300 251.000 30.0 90.878 4.590 -999.990 -999.990 0.909 ..P WKT 2010 06 14 21 14 55 31.3200 -97.3300 251.000 122.0 92.395 4.150 -999.990 -999.990 0.924 ..P WKT 2010 06 14 21 19 55 31.3200 -97.3300 251.000 457.0 84.549 4.490 -999.990 -999.990 0.845 ..P WKT 2010 06 14 21 24 55 31.3200 -97.3300 251.000 30.0 86.349 3.870 -999.990 -999.990 0.863 ..P WKT 2010 06 14 21 29 55 31.3200 -97.3300 251.000 122.0 94.396 4.630 -999.990 -999.990 0.944 ..P WKT 2010 06 14 21 34 55 31.3200 -97.3300 251.000 457.0 87.963 3.620 -999.990 -999.990 0.880 ..P WKT 2010 06 14 21 44 55 31.3200 -97.3300 251.000 30.0 89.053 4.340 -999.990 -999.990 0.891 ..P WKT 2010 06 14 21 49 55 31.3200 -97.3300 251.000 122.0 96.296 3.780 -999.990 -999.990 0.963 ..P WKT 2010 06 14 21 54 55 31.3200 -97.3300 251.000 457.0 92.457 3.600 -999.990 -999.990 0.925 ..P WKT 2010 06 14 21 59 55 31.3200 -97.3300 251.000 30.0 92.597 4.590 -999.990 -999.990 0.926 ..P WKT 2010 06 14 22 04 55 31.3200 -97.3300 251.000 122.0 106.247 5.140 -999.990 -999.990 1.062 ..P WKT 2010 06 14 22 09 55 31.3200 -97.3300 251.000 457.0 89.606 4.070 -999.990 -999.990 0.896 ..P WKT 2010 06 14 22 19 55 31.3200 -97.3300 251.000 30.0 93.544 3.800 -999.990 -999.990 0.935 ..P WKT 2010 06 14 22 24 55 31.3200 -97.3300 251.000 122.0 92.790 3.870 -999.990 -999.990 0.928 ..P WKT 2010 06 14 22 29 55 31.3200 -97.3300 251.000 457.0 96.164 3.850 -999.990 -999.990 0.962 ..P WKT 2010 06 14 22 34 55 31.3200 -97.3300 251.000 30.0 105.238 3.630 -999.990 -999.990 1.052 ..P WKT 2010 06 14 22 39 55 31.3200 -97.3300 251.000 122.0 99.642 4.430 -999.990 -999.990 0.996 ..P WKT 2010 06 14 22 44 55 31.3200 -97.3300 251.000 457.0 102.308 3.510 -999.990 -999.990 1.023 ..P WKT 2010 06 14 22 54 55 31.3200 -97.3300 251.000 30.0 99.213 3.420 -999.990 -999.990 0.992 ..P WKT 2010 06 14 22 59 55 31.3200 -97.3300 251.000 122.0 100.577 3.700 -999.990 -999.990 1.006 ..P WKT 2010 06 14 23 04 55 31.3200 -97.3300 251.000 457.0 96.950 4.860 -999.990 -999.990 0.970 ..P WKT 2010 06 14 23 09 55 31.3200 -97.3300 251.000 30.0 96.887 5.030 -999.990 -999.990 0.969 ..P WKT 2010 06 14 23 14 55 31.3200 -97.3300 251.000 122.0 104.532 4.050 -999.990 -999.990 1.045 ..P WKT 2010 06 14 23 19 55 31.3200 -97.3300 251.000 457.0 97.905 3.880 -999.990 -999.990 0.979 ..P WKT 2010 06 14 23 29 55 31.3200 -97.3300 251.000 30.0 96.612 4.850 -999.990 -999.990 0.966 ..P WKT 2010 06 14 23 34 55 31.3200 -97.3300 251.000 122.0 102.239 3.920 -999.990 -999.990 1.022 ..P WKT 2010 06 14 23 39 55 31.3200 -97.3300 251.000 457.0 92.149 4.670 -999.990 -999.990 0.921 ..P WKT 2010 06 14 23 44 55 31.3200 -97.3300 251.000 30.0 84.913 4.800 -999.990 -999.990 0.849 ..P WKT 2010 06 14 23 49 55 31.3200 -97.3300 251.000 122.0 98.835 5.840 -999.990 -999.990 0.988 ..P WKT 2010 06 15 00 09 55 31.3200 -97.3300 251.000 457.0 91.349 4.130 -999.990 -999.990 0.913 ..P WKT 2010 06 15 00 10 25 31.3200 -97.3300 251.000 457.0 84.224 4.110 -999.990 -999.990 0.842 ..P WKT 2010 06 15 00 10 55 31.3200 -97.3300 251.000 457.0 88.252 3.370 -999.990 -999.990 0.883 ..P WKT 2010 06 15 00 11 25 31.3200 -97.3300 251.000 457.0 88.563 3.690 -999.990 -999.990 0.886 ..P WKT 2010 06 15 00 11 55 31.3200 -97.3300 251.000 457.0 90.590 3.510 -999.990 -999.990 0.906 ..P WKT 2010 06 15 00 12 25 31.3200 -97.3300 251.000 457.0 91.758 3.520 -999.990 -999.990 0.918 ..P WKT 2010 06 15 00 12 55 31.3200 -97.3300 251.000 457.0 88.351 3.690 -999.990 -999.990 0.884 ..P WKT 2010 06 15 00 13 25 31.3200 -97.3300 251.000 457.0 86.088 4.110 -999.990 -999.990 0.861 ..P WKT 2010 06 15 00 13 55 31.3200 -97.3300 251.000 457.0 91.832 3.660 -999.990 -999.990 0.918 ..P WKT 2010 06 15 00 14 25 31.3200 -97.3300 251.000 457.0 85.280 3.820 -999.990 -999.990 0.853 ..P WKT 2010 06 15 00 14 55 31.3200 -97.3300 251.000 457.0 89.879 3.790 -999.990 -999.990 0.899 ..P WKT 2010 06 15 00 19 55 31.3200 -97.3300 251.000 30.0 89.268 4.510 -999.990 -999.990 0.893 ..P WKT 2010 06 15 00 24 55 31.3200 -97.3300 251.000 122.0 92.372 4.830 -999.990 -999.990 0.924 ..P WKT 2010 06 15 00 29 55 31.3200 -97.3300 251.000 457.0 85.760 4.940 -999.990 -999.990 0.858 ..P WKT 2010 06 15 00 34 55 31.3200 -97.3300 251.000 30.0 93.150 4.300 -999.990 -999.990 0.932 ..P WKT 2010 06 15 00 39 55 31.3200 -97.3300 251.000 122.0 99.680 4.840 -999.990 -999.990 0.997 ..P WKT 2010 06 15 00 44 55 31.3200 -97.3300 251.000 457.0 87.072 3.390 -999.990 -999.990 0.871 ..P WKT 2010 06 15 00 54 55 31.3200 -97.3300 251.000 30.0 90.614 3.630 -999.990 -999.990 0.906 ..P WKT 2010 06 15 00 59 55 31.3200 -97.3300 251.000 122.0 90.770 3.860 -999.990 -999.990 0.908 ..P WKT 2010 06 15 01 04 55 31.3200 -97.3300 251.000 457.0 88.357 4.130 -999.990 -999.990 0.884 ..P WKT 2010 06 15 01 09 55 31.3200 -97.3300 251.000 30.0 81.522 4.610 -999.990 -999.990 0.815 ..P WKT 2010 06 15 01 14 55 31.3200 -97.3300 251.000 122.0 89.808 4.650 -999.990 -999.990 0.898 ..P WKT 2010 06 15 01 19 55 31.3200 -97.3300 251.000 457.0 82.263 5.200 -999.990 -999.990 0.823 ..P WKT 2010 06 15 01 29 55 31.3200 -97.3300 251.000 30.0 94.449 6.210 -999.990 -999.990 0.944 ..P WKT 2010 06 15 01 34 55 31.3200 -97.3300 251.000 122.0 92.221 5.340 -999.990 -999.990 0.922 ..P WKT 2010 06 15 01 39 55 31.3200 -97.3300 251.000 457.0 84.295 4.800 -999.990 -999.990 0.843 ..P WKT 2010 06 15 01 44 55 31.3200 -97.3300 251.000 30.0 93.039 4.560 -999.990 -999.990 0.930 ..P WKT 2010 06 15 01 49 55 31.3200 -97.3300 251.000 122.0 95.086 4.760 -999.990 -999.990 0.951 ..P WKT 2010 06 15 01 54 55 31.3200 -97.3300 251.000 457.0 92.860 4.230 -999.990 -999.990 0.929 ..P WKT 2010 06 15 02 04 55 31.3200 -97.3300 251.000 30.0 89.345 4.060 -999.990 -999.990 0.893 ..P WKT 2010 06 15 02 09 55 31.3200 -97.3300 251.000 122.0 91.757 4.580 -999.990 -999.990 0.918 ..P WKT 2010 06 15 02 14 55 31.3200 -97.3300 251.000 457.0 87.907 4.100 -999.990 -999.990 0.879 ..P WKT 2010 06 15 02 19 55 31.3200 -97.3300 251.000 30.0 87.331 4.290 -999.990 -999.990 0.873 ..P WKT 2010 06 15 02 24 55 31.3200 -97.3300 251.000 122.0 94.720 4.250 -999.990 -999.990 0.947 ..P WKT 2010 06 15 02 29 55 31.3200 -97.3300 251.000 457.0 88.596 3.970 -999.990 -999.990 0.886 ..P WKT 2010 06 15 02 39 55 31.3200 -97.3300 251.000 30.0 87.322 3.580 -999.990 -999.990 0.873 ..P WKT 2010 06 15 02 44 55 31.3200 -97.3300 251.000 122.0 92.451 3.610 -999.990 -999.990 0.925 ..P WKT 2010 06 15 02 49 55 31.3200 -97.3300 251.000 457.0 92.748 4.290 -999.990 -999.990 0.927 ..P WKT 2010 06 15 02 54 55 31.3200 -97.3300 251.000 30.0 96.596 4.360 -999.990 -999.990 0.966 ..P WKT 2010 06 15 02 59 55 31.3200 -97.3300 251.000 122.0 93.624 4.330 -999.990 -999.990 0.936 ..P WKT 2010 06 15 03 04 55 31.3200 -97.3300 251.000 457.0 89.518 4.160 -999.990 -999.990 0.895 ..P WKT 2010 06 15 03 14 55 31.3200 -97.3300 251.000 30.0 85.244 4.520 -999.990 -999.990 0.852 ..P WKT 2010 06 15 03 19 55 31.3200 -97.3300 251.000 122.0 94.442 4.010 -999.990 -999.990 0.944 ..P WKT 2010 06 15 03 24 55 31.3200 -97.3300 251.000 457.0 90.298 4.890 -999.990 -999.990 0.903 ..P WKT 2010 06 15 03 29 55 31.3200 -97.3300 251.000 30.0 91.263 4.240 -999.990 -999.990 0.913 ..P WKT 2010 06 15 03 34 55 31.3200 -97.3300 251.000 122.0 89.391 4.810 -999.990 -999.990 0.894 ..P WKT 2010 06 15 03 39 55 31.3200 -97.3300 251.000 457.0 91.206 4.620 -999.990 -999.990 0.912 ..P WKT 2010 06 15 03 49 55 31.3200 -97.3300 251.000 30.0 92.082 5.200 -999.990 -999.990 0.921 ..P WKT 2010 06 15 03 54 55 31.3200 -97.3300 251.000 122.0 83.772 4.660 -999.990 -999.990 0.838 ..P WKT 2010 06 15 03 59 55 31.3200 -97.3300 251.000 457.0 90.486 5.310 -999.990 -999.990 0.905 ..P WKT 2010 06 15 04 04 55 31.3200 -97.3300 251.000 30.0 84.164 4.010 -999.990 -999.990 0.842 ..P WKT 2010 06 15 04 09 55 31.3200 -97.3300 251.000 122.0 90.309 4.140 -999.990 -999.990 0.903 ..P WKT 2010 06 15 04 14 55 31.3200 -97.3300 251.000 457.0 82.857 4.190 -999.990 -999.990 0.829 ..P WKT 2010 06 15 04 24 55 31.3200 -97.3300 251.000 30.0 85.473 3.280 -999.990 -999.990 0.855 ..P WKT 2010 06 15 04 29 55 31.3200 -97.3300 251.000 122.0 85.628 3.540 -999.990 -999.990 0.856 ..P WKT 2010 06 15 04 34 55 31.3200 -97.3300 251.000 457.0 82.669 3.110 -999.990 -999.990 0.827 ..P WKT 2010 06 15 04 39 55 31.3200 -97.3300 251.000 30.0 88.484 4.130 -999.990 -999.990 0.885 ..P WKT 2010 06 15 04 44 55 31.3200 -97.3300 251.000 122.0 91.750 3.640 -999.990 -999.990 0.917 ..P WKT 2010 06 15 04 49 55 31.3200 -97.3300 251.000 457.0 81.721 2.620 -999.990 -999.990 0.817 ..P WKT 2010 06 15 05 04 55 31.3200 -97.3300 251.000 30.0 86.494 3.610 -999.990 -999.990 0.865 ..P WKT 2010 06 15 05 09 55 31.3200 -97.3300 251.000 122.0 84.349 3.390 -999.990 -999.990 0.843 ..P WKT 2010 06 15 05 14 55 31.3200 -97.3300 251.000 457.0 76.555 5.090 -999.990 -999.990 0.766 ..P WKT 2010 06 15 05 19 55 31.3200 -97.3300 251.000 30.0 88.539 2.950 -999.990 -999.990 0.885 ..P WKT 2010 06 15 05 24 55 31.3200 -97.3300 251.000 122.0 90.208 3.150 -999.990 -999.990 0.902 ..P WKT 2010 06 15 05 29 55 31.3200 -97.3300 251.000 457.0 83.970 3.090 -999.990 -999.990 0.840 ..P WKT 2010 06 15 05 39 55 31.3200 -97.3300 251.000 30.0 89.020 3.680 -999.990 -999.990 0.890 ..P WKT 2010 06 15 05 44 55 31.3200 -97.3300 251.000 122.0 85.768 3.760 -999.990 -999.990 0.858 ..P WKT 2010 06 15 05 49 55 31.3200 -97.3300 251.000 457.0 85.619 4.920 -999.990 -999.990 0.856 ..P WKT 2010 06 15 05 54 55 31.3200 -97.3300 251.000 30.0 88.434 5.960 -999.990 -999.990 0.884 ..P WKT 2010 06 15 05 59 55 31.3200 -97.3300 251.000 122.0 85.324 4.970 -999.990 -999.990 0.853 ..P WKT 2010 06 15 06 04 55 31.3200 -97.3300 251.000 457.0 76.998 3.910 -999.990 -999.990 0.770 ..P WKT 2010 06 15 06 14 55 31.3200 -97.3300 251.000 30.0 83.491 3.890 -999.990 -999.990 0.835 ..P WKT 2010 06 15 06 19 55 31.3200 -97.3300 251.000 122.0 87.310 5.230 -999.990 -999.990 0.873 ..P WKT 2010 06 15 06 24 55 31.3200 -97.3300 251.000 457.0 83.942 5.740 -999.990 -999.990 0.839 ..P WKT 2010 06 15 06 29 55 31.3200 -97.3300 251.000 30.0 80.434 6.740 -999.990 -999.990 0.804 ..P WKT 2010 06 15 06 34 55 31.3200 -97.3300 251.000 122.0 84.251 6.440 -999.990 -999.990 0.843 ..P WKT 2010 06 15 06 39 55 31.3200 -97.3300 251.000 457.0 75.675 4.880 -999.990 -999.990 0.757 ..P WKT 2010 06 15 06 49 55 31.3200 -97.3300 251.000 30.0 78.279 4.990 -999.990 -999.990 0.783 ..P WKT 2010 06 15 06 54 55 31.3200 -97.3300 251.000 122.0 78.616 6.210 -999.990 -999.990 0.786 ..P WKT 2010 06 15 06 59 55 31.3200 -97.3300 251.000 457.0 76.138 6.960 -999.990 -999.990 0.761 ..P WKT 2010 06 15 07 04 55 31.3200 -97.3300 251.000 30.0 77.600 5.730 -999.990 -999.990 0.776 ..P WKT 2010 06 15 07 09 55 31.3200 -97.3300 251.000 122.0 89.188 3.670 -999.990 -999.990 0.892 ..P WKT 2010 06 15 07 14 55 31.3200 -97.3300 251.000 457.0 81.929 2.710 -999.990 -999.990 0.819 ..P WKT 2010 06 15 07 24 55 31.3200 -97.3300 251.000 30.0 86.394 2.420 -999.990 -999.990 0.864 ..P WKT 2010 06 15 07 29 55 31.3200 -97.3300 251.000 122.0 87.713 3.960 -999.990 -999.990 0.877 ..P WKT 2010 06 15 07 34 55 31.3200 -97.3300 251.000 457.0 85.939 2.930 -999.990 -999.990 0.859 ..P WKT 2010 06 15 07 39 55 31.3200 -97.3300 251.000 30.0 88.662 3.520 -999.990 -999.990 0.887 ..P WKT 2010 06 15 07 44 55 31.3200 -97.3300 251.000 122.0 89.416 3.380 -999.990 -999.990 0.894 ..P WKT 2010 06 15 07 49 55 31.3200 -97.3300 251.000 457.0 91.295 2.740 -999.990 -999.990 0.913 ..P WKT 2010 06 15 07 59 55 31.3200 -97.3300 251.000 30.0 87.510 2.430 -999.990 -999.990 0.875 ..P WKT 2010 06 15 08 04 55 31.3200 -97.3300 251.000 122.0 93.076 4.100 -999.990 -999.990 0.931 ..P WKT 2010 06 15 08 09 55 31.3200 -97.3300 251.000 457.0 81.241 3.130 -999.990 -999.990 0.812 ..P WKT 2010 06 15 08 14 55 31.3200 -97.3300 251.000 30.0 83.440 3.450 -999.990 -999.990 0.834 ..P WKT 2010 06 15 08 19 55 31.3200 -97.3300 251.000 122.0 94.334 4.600 -999.990 -999.990 0.943 ..P WKT 2010 06 15 08 24 55 31.3200 -97.3300 251.000 457.0 87.835 3.440 -999.990 -999.990 0.878 ..P WKT 2010 06 15 08 34 55 31.3200 -97.3300 251.000 30.0 89.642 2.880 -999.990 -999.990 0.896 ..P WKT 2010 06 15 08 39 55 31.3200 -97.3300 251.000 122.0 95.702 3.530 -999.990 -999.990 0.957 ..P WKT 2010 06 15 08 44 55 31.3200 -97.3300 251.000 457.0 89.428 3.500 -999.990 -999.990 0.894 ..P WKT 2010 06 15 08 49 55 31.3200 -97.3300 251.000 30.0 82.035 5.610 -999.990 -999.990 0.820 ..P WKT 2010 06 15 08 54 55 31.3200 -97.3300 251.000 122.0 86.691 4.170 -999.990 -999.990 0.867 ..P WKT 2010 06 15 08 59 55 31.3200 -97.3300 251.000 457.0 83.924 2.960 -999.990 -999.990 0.839 ..P WKT 2010 06 15 09 09 55 31.3200 -97.3300 251.000 30.0 85.491 3.250 -999.990 -999.990 0.855 ..P WKT 2010 06 15 09 14 55 31.3200 -97.3300 251.000 122.0 92.342 3.650 -999.990 -999.990 0.923 ..P WKT 2010 06 15 09 19 55 31.3200 -97.3300 251.000 457.0 85.057 3.910 -999.990 -999.990 0.851 ..P WKT 2010 06 15 09 24 55 31.3200 -97.3300 251.000 30.0 82.393 4.650 -999.990 -999.990 0.824 ..P WKT 2010 06 15 09 29 55 31.3200 -97.3300 251.000 122.0 88.821 4.960 -999.990 -999.990 0.888 ..P WKT 2010 06 15 09 34 55 31.3200 -97.3300 251.000 457.0 81.122 3.390 -999.990 -999.990 0.811 ..P WKT 2010 06 15 09 44 55 31.3200 -97.3300 251.000 30.0 84.086 4.250 -999.990 -999.990 0.841 ..P WKT 2010 06 15 09 49 55 31.3200 -97.3300 251.000 122.0 87.194 3.890 -999.990 -999.990 0.872 ..P WKT 2010 06 15 09 54 55 31.3200 -97.3300 251.000 457.0 81.498 4.140 -999.990 -999.990 0.815 ..P WKT 2010 06 15 09 59 55 31.3200 -97.3300 251.000 30.0 84.885 3.240 -999.990 -999.990 0.849 ..P WKT 2010 06 15 10 04 55 31.3200 -97.3300 251.000 122.0 86.455 3.280 -999.990 -999.990 0.865 ..P WKT 2010 06 15 10 09 55 31.3200 -97.3300 251.000 457.0 83.416 4.270 -999.990 -999.990 0.834 ..P WKT 2010 06 15 10 19 55 31.3200 -97.3300 251.000 30.0 95.968 2.510 -999.990 -999.990 0.960 ..P WKT 2010 06 15 10 24 55 31.3200 -97.3300 251.000 122.0 94.383 2.540 -999.990 -999.990 0.944 ..P WKT 2010 06 15 10 29 55 31.3200 -97.3300 251.000 457.0 89.869 3.690 -999.990 -999.990 0.899 ..P WKT 2010 06 15 10 34 55 31.3200 -97.3300 251.000 30.0 95.264 4.510 -999.990 -999.990 0.953 ..P WKT 2010 06 15 10 39 55 31.3200 -97.3300 251.000 122.0 96.331 3.960 -999.990 -999.990 0.963 ..P WKT 2010 06 15 10 44 55 31.3200 -97.3300 251.000 457.0 90.844 3.620 -999.990 -999.990 0.908 ..P WKT 2010 06 15 10 54 55 31.3200 -97.3300 251.000 30.0 88.059 4.070 -999.990 -999.990 0.881 ..P WKT 2010 06 15 10 59 55 31.3200 -97.3300 251.000 122.0 93.548 4.210 -999.990 -999.990 0.935 ..P WKT 2010 06 15 11 04 55 31.3200 -97.3300 251.000 457.0 82.312 5.170 -999.990 -999.990 0.823 ..P WKT 2010 06 15 11 09 55 31.3200 -97.3300 251.000 30.0 89.750 4.200 -999.990 -999.990 0.897 ..P WKT 2010 06 15 11 14 55 31.3200 -97.3300 251.000 122.0 84.369 3.990 -999.990 -999.990 0.844 ..P WKT 2010 06 15 11 19 55 31.3200 -97.3300 251.000 457.0 78.990 4.260 -999.990 -999.990 0.790 ..P WKT 2010 06 15 11 29 55 31.3200 -97.3300 251.000 30.0 79.700 4.680 -999.990 -999.990 0.797 ..P WKT 2010 06 15 11 34 55 31.3200 -97.3300 251.000 122.0 89.404 3.350 -999.990 -999.990 0.894 ..P WKT 2010 06 15 11 39 55 31.3200 -97.3300 251.000 457.0 79.620 4.160 -999.990 -999.990 0.796 ..P WKT 2010 06 15 11 44 55 31.3200 -97.3300 251.000 30.0 83.754 4.440 -999.990 -999.990 0.838 ..P WKT 2010 06 15 11 49 55 31.3200 -97.3300 251.000 122.0 84.269 3.880 -999.990 -999.990 0.843 ..P WKT 2010 06 15 12 09 55 31.3200 -97.3300 251.000 457.0 78.236 2.510 -999.990 -999.990 0.782 ..P WKT 2010 06 15 12 10 25 31.3200 -97.3300 251.000 457.0 77.314 2.590 -999.990 -999.990 0.773 ..P WKT 2010 06 15 12 10 55 31.3200 -97.3300 251.000 457.0 78.339 4.440 -999.990 -999.990 0.783 ..P WKT 2010 06 15 12 11 25 31.3200 -97.3300 251.000 457.0 83.256 3.890 -999.990 -999.990 0.833 ..P WKT 2010 06 15 12 11 55 31.3200 -97.3300 251.000 457.0 82.612 2.990 -999.990 -999.990 0.826 ..P WKT 2010 06 15 12 12 25 31.3200 -97.3300 251.000 457.0 79.187 2.470 -999.990 -999.990 0.792 ..P WKT 2010 06 15 12 12 55 31.3200 -97.3300 251.000 457.0 76.040 2.620 -999.990 -999.990 0.760 ..P WKT 2010 06 15 12 13 25 31.3200 -97.3300 251.000 457.0 83.182 4.000 -999.990 -999.990 0.832 ..P WKT 2010 06 15 12 13 55 31.3200 -97.3300 251.000 457.0 84.484 4.330 -999.990 -999.990 0.845 ..P WKT 2010 06 15 12 14 25 31.3200 -97.3300 251.000 457.0 80.503 2.700 -999.990 -999.990 0.805 ..P WKT 2010 06 15 12 14 55 31.3200 -97.3300 251.000 457.0 77.635 3.010 -999.990 -999.990 0.776 ..P WKT 2010 06 15 12 19 55 31.3200 -97.3300 251.000 30.0 85.930 3.340 -999.990 -999.990 0.859 ..P WKT 2010 06 15 12 24 55 31.3200 -97.3300 251.000 122.0 86.717 4.290 -999.990 -999.990 0.867 ..P WKT 2010 06 15 12 29 55 31.3200 -97.3300 251.000 457.0 75.272 3.210 -999.990 -999.990 0.753 ..P WKT 2010 06 15 12 34 55 31.3200 -97.3300 251.000 30.0 88.569 2.930 -999.990 -999.990 0.886 ..P WKT 2010 06 15 12 39 55 31.3200 -97.3300 251.000 122.0 87.966 3.310 -999.990 -999.990 0.880 ..P WKT 2010 06 15 12 44 55 31.3200 -97.3300 251.000 457.0 75.134 3.020 -999.990 -999.990 0.751 ..P WKT 2010 06 15 12 54 55 31.3200 -97.3300 251.000 30.0 91.787 2.820 -999.990 -999.990 0.918 ..P WKT 2010 06 15 12 59 55 31.3200 -97.3300 251.000 122.0 85.141 2.800 -999.990 -999.990 0.851 ..P WKT 2010 06 15 13 04 55 31.3200 -97.3300 251.000 457.0 70.994 3.140 -999.990 -999.990 0.710 ..P WKT 2010 06 15 13 09 55 31.3200 -97.3300 251.000 30.0 83.800 3.480 -999.990 -999.990 0.838 ..P WKT 2010 06 15 13 14 55 31.3200 -97.3300 251.000 122.0 85.907 3.460 -999.990 -999.990 0.859 ..P WKT 2010 06 15 13 19 55 31.3200 -97.3300 251.000 457.0 74.958 3.700 -999.990 -999.990 0.750 ..P WKT 2010 06 15 13 29 55 31.3200 -97.3300 251.000 30.0 83.340 4.130 -999.990 -999.990 0.833 ..P WKT 2010 06 15 13 34 55 31.3200 -97.3300 251.000 122.0 86.419 4.290 -999.990 -999.990 0.864 ..P WKT 2010 06 15 13 39 55 31.3200 -97.3300 251.000 457.0 79.083 3.860 -999.990 -999.990 0.791 ..P WKT 2010 06 15 13 44 55 31.3200 -97.3300 251.000 30.0 86.606 4.800 -999.990 -999.990 0.866 ..P WKT 2010 06 15 13 49 55 31.3200 -97.3300 251.000 122.0 91.072 3.920 -999.990 -999.990 0.911 ..P WKT 2010 06 15 13 54 55 31.3200 -97.3300 251.000 457.0 83.599 2.850 -999.990 -999.990 0.836 ..P WKT 2010 06 15 14 04 55 31.3200 -97.3300 251.000 30.0 84.678 2.910 -999.990 -999.990 0.847 ..P WKT 2010 06 15 14 09 55 31.3200 -97.3300 251.000 122.0 93.090 3.900 -999.990 -999.990 0.931 ..P WKT 2010 06 15 14 14 55 31.3200 -97.3300 251.000 457.0 86.094 4.280 -999.990 -999.990 0.861 ..P WKT 2010 06 15 14 19 55 31.3200 -97.3300 251.000 30.0 85.345 4.150 -999.990 -999.990 0.853 ..P WKT 2010 06 15 14 24 55 31.3200 -97.3300 251.000 122.0 95.281 2.980 -999.990 -999.990 0.953 ..P WKT 2010 06 15 14 29 55 31.3200 -97.3300 251.000 457.0 94.254 5.930 -999.990 -999.990 0.943 ..P WKT 2010 06 15 14 39 55 31.3200 -97.3300 251.000 30.0 91.129 3.090 -999.990 -999.990 0.911 ..P WKT 2010 06 15 14 44 55 31.3200 -97.3300 251.000 122.0 99.852 3.540 -999.990 -999.990 0.999 ..P WKT 2010 06 15 14 49 55 31.3200 -97.3300 251.000 457.0 86.796 3.490 -999.990 -999.990 0.868 ..P WKT 2010 06 15 14 54 55 31.3200 -97.3300 251.000 30.0 85.671 2.930 -999.990 -999.990 0.857 ..P WKT 2010 06 15 14 59 55 31.3200 -97.3300 251.000 122.0 91.618 2.720 -999.990 -999.990 0.916 ..P WKT 2010 06 15 15 04 55 31.3200 -97.3300 251.000 457.0 87.858 2.370 -999.990 -999.990 0.879 ..P WKT 2010 06 15 15 14 55 31.3200 -97.3300 251.000 30.0 88.083 4.890 -999.990 -999.990 0.881 ..P WKT 2010 06 15 15 19 55 31.3200 -97.3300 251.000 122.0 92.900 2.770 -999.990 -999.990 0.929 ..P WKT 2010 06 15 15 24 55 31.3200 -97.3300 251.000 457.0 90.785 3.240 -999.990 -999.990 0.908 ..P WKT 2010 06 15 15 29 55 31.3200 -97.3300 251.000 30.0 86.728 2.700 -999.990 -999.990 0.867 ..P WKT 2010 06 15 15 34 55 31.3200 -97.3300 251.000 122.0 97.645 3.360 -999.990 -999.990 0.976 ..P WKT 2010 06 15 15 39 55 31.3200 -97.3300 251.000 457.0 86.934 3.050 -999.990 -999.990 0.869 ..P WKT 2010 06 15 15 49 55 31.3200 -97.3300 251.000 30.0 87.694 3.420 -999.990 -999.990 0.877 ..P WKT 2010 06 15 15 54 55 31.3200 -97.3300 251.000 122.0 91.401 3.290 -999.990 -999.990 0.914 ..P WKT 2010 06 15 15 59 55 31.3200 -97.3300 251.000 457.0 80.694 3.240 -999.990 -999.990 0.807 ..P WKT 2010 06 15 16 04 55 31.3200 -97.3300 251.000 30.0 85.231 3.960 -999.990 -999.990 0.852 ..P WKT 2010 06 15 16 09 55 31.3200 -97.3300 251.000 122.0 90.322 3.490 -999.990 -999.990 0.903 ..P WKT 2010 06 15 16 14 55 31.3200 -97.3300 251.000 457.0 79.895 4.400 -999.990 -999.990 0.799 ..P WKT 2010 06 15 16 24 55 31.3200 -97.3300 251.000 30.0 84.198 3.560 -999.990 -999.990 0.842 ..P WKT 2010 06 15 16 29 55 31.3200 -97.3300 251.000 122.0 89.783 3.920 -999.990 -999.990 0.898 ..P WKT 2010 06 15 16 34 55 31.3200 -97.3300 251.000 457.0 87.333 4.920 -999.990 -999.990 0.873 ..P WKT 2010 06 15 16 39 55 31.3200 -97.3300 251.000 30.0 89.039 4.000 -999.990 -999.990 0.890 ..P WKT 2010 06 15 16 44 55 31.3200 -97.3300 251.000 122.0 93.237 3.420 -999.990 -999.990 0.932 ..P WKT 2010 06 15 16 49 55 31.3200 -97.3300 251.000 457.0 90.648 3.240 -999.990 -999.990 0.906 ..P WKT 2010 06 15 17 04 55 31.3200 -97.3300 251.000 30.0 85.606 5.140 -999.990 -999.990 0.856 ..P WKT 2010 06 15 17 09 55 31.3200 -97.3300 251.000 122.0 85.902 3.730 -999.990 -999.990 0.859 ..P WKT 2010 06 15 17 14 55 31.3200 -97.3300 251.000 457.0 84.121 4.610 -999.990 -999.990 0.841 ..P WKT 2010 06 15 17 19 55 31.3200 -97.3300 251.000 30.0 84.694 3.880 -999.990 -999.990 0.847 ..P WKT 2010 06 15 17 24 55 31.3200 -97.3300 251.000 122.0 86.789 3.450 -999.990 -999.990 0.868 ..P WKT 2010 06 15 17 29 55 31.3200 -97.3300 251.000 457.0 84.455 3.320 -999.990 -999.990 0.845 ..P WKT 2010 06 15 17 39 55 31.3200 -97.3300 251.000 30.0 81.612 2.920 -999.990 -999.990 0.816 ..P WKT 2010 06 15 17 44 55 31.3200 -97.3300 251.000 122.0 86.083 3.530 -999.990 -999.990 0.861 ..P WKT 2010 06 15 17 49 55 31.3200 -97.3300 251.000 457.0 83.913 4.070 -999.990 -999.990 0.839 ..P WKT 2010 06 15 17 54 55 31.3200 -97.3300 251.000 30.0 85.341 3.820 -999.990 -999.990 0.853 ..P WKT 2010 06 15 17 59 55 31.3200 -97.3300 251.000 122.0 88.566 3.850 -999.990 -999.990 0.886 ..P WKT 2010 06 15 18 04 55 31.3200 -97.3300 251.000 457.0 85.981 4.280 -999.990 -999.990 0.860 ..P WKT 2010 06 15 18 14 55 31.3200 -97.3300 251.000 30.0 85.198 2.860 -999.990 -999.990 0.852 ..P WKT 2010 06 15 18 19 55 31.3200 -97.3300 251.000 122.0 88.384 2.960 -999.990 -999.990 0.884 ..P WKT 2010 06 15 18 24 55 31.3200 -97.3300 251.000 457.0 88.940 4.880 -999.990 -999.990 0.889 ..P WKT 2010 06 15 18 29 55 31.3200 -97.3300 251.000 30.0 91.572 3.160 -999.990 -999.990 0.916 ..P WKT 2010 06 15 18 34 55 31.3200 -97.3300 251.000 122.0 91.299 5.410 -999.990 -999.990 0.913 ..P WKT 2010 06 15 18 39 55 31.3200 -97.3300 251.000 457.0 85.910 3.010 -999.990 -999.990 0.859 ..P WKT 2010 06 15 18 49 55 31.3200 -97.3300 251.000 30.0 86.293 3.110 -999.990 -999.990 0.863 ..P WKT 2010 06 15 18 54 55 31.3200 -97.3300 251.000 122.0 86.535 2.990 -999.990 -999.990 0.865 ..P WKT 2010 06 15 18 59 55 31.3200 -97.3300 251.000 457.0 82.628 2.840 -999.990 -999.990 0.826 ..P WKT 2010 06 15 19 04 55 31.3200 -97.3300 251.000 30.0 80.658 3.270 -999.990 -999.990 0.807 ..P WKT 2010 06 15 19 09 55 31.3200 -97.3300 251.000 122.0 83.941 2.770 -999.990 -999.990 0.839 ..P WKT 2010 06 15 19 14 55 31.3200 -97.3300 251.000 457.0 81.971 2.590 -999.990 -999.990 0.820 ..P WKT 2010 06 15 19 24 55 31.3200 -97.3300 251.000 30.0 87.249 3.110 -999.990 -999.990 0.872 ..P WKT 2010 06 15 19 29 55 31.3200 -97.3300 251.000 122.0 91.181 3.130 -999.990 -999.990 0.912 ..P WKT 2010 06 15 19 34 55 31.3200 -97.3300 251.000 457.0 83.507 3.330 -999.990 -999.990 0.835 ..P WKT 2010 06 15 19 39 55 31.3200 -97.3300 251.000 30.0 91.583 4.350 -999.990 -999.990 0.916 ..P WKT 2010 06 15 19 44 55 31.3200 -97.3300 251.000 122.0 88.330 4.360 -999.990 -999.990 0.883 ..P WKT 2010 06 15 19 49 55 31.3200 -97.3300 251.000 457.0 85.631 3.060 -999.990 -999.990 0.856 ..P WKT 2010 06 15 19 59 55 31.3200 -97.3300 251.000 30.0 89.111 3.710 -999.990 -999.990 0.891 ..P WKT 2010 06 15 20 04 55 31.3200 -97.3300 251.000 122.0 95.842 3.660 -999.990 -999.990 0.958 ..P WKT 2010 06 15 20 09 55 31.3200 -97.3300 251.000 457.0 80.202 4.140 -999.990 -999.990 0.802 ..P WKT 2010 06 15 20 14 55 31.3200 -97.3300 251.000 30.0 86.105 3.700 -999.990 -999.990 0.861 ..P WKT 2010 06 15 20 19 55 31.3200 -97.3300 251.000 122.0 90.349 3.570 -999.990 -999.990 0.903 ..P WKT 2010 06 15 20 24 55 31.3200 -97.3300 251.000 457.0 82.721 3.140 -999.990 -999.990 0.827 ..P WKT 2010 06 15 20 34 55 31.3200 -97.3300 251.000 30.0 81.033 3.390 -999.990 -999.990 0.810 ..P WKT 2010 06 15 20 39 55 31.3200 -97.3300 251.000 122.0 91.665 3.420 -999.990 -999.990 0.917 ..P WKT 2010 06 15 20 44 55 31.3200 -97.3300 251.000 457.0 81.042 4.280 -999.990 -999.990 0.810 ..P WKT 2010 06 15 20 49 55 31.3200 -97.3300 251.000 30.0 88.223 4.400 -999.990 -999.990 0.882 ..P WKT 2010 06 15 20 54 55 31.3200 -97.3300 251.000 122.0 95.816 4.000 -999.990 -999.990 0.958 ..P WKT 2010 06 15 20 59 55 31.3200 -97.3300 251.000 457.0 83.539 3.990 -999.990 -999.990 0.835 ..P WKT 2010 06 15 21 09 55 31.3200 -97.3300 251.000 30.0 87.291 4.580 -999.990 -999.990 0.873 ..P WKT 2010 06 15 21 14 55 31.3200 -97.3300 251.000 122.0 88.971 4.410 -999.990 -999.990 0.890 ..P WKT 2010 06 15 21 19 55 31.3200 -97.3300 251.000 457.0 83.614 3.430 -999.990 -999.990 0.836 ..P WKT 2010 06 15 21 24 55 31.3200 -97.3300 251.000 30.0 79.777 3.440 -999.990 -999.990 0.798 ..P WKT 2010 06 15 21 29 55 31.3200 -97.3300 251.000 122.0 89.317 3.560 -999.990 -999.990 0.893 ..P WKT 2010 06 15 21 34 55 31.3200 -97.3300 251.000 457.0 86.858 3.030 -999.990 -999.990 0.869 ..P WKT 2010 06 15 21 44 55 31.3200 -97.3300 251.000 30.0 87.811 3.540 -999.990 -999.990 0.878 ..P WKT 2010 06 15 21 49 55 31.3200 -97.3300 251.000 122.0 98.254 3.860 -999.990 -999.990 0.983 ..P WKT 2010 06 15 21 54 55 31.3200 -97.3300 251.000 457.0 86.913 5.170 -999.990 -999.990 0.869 ..P WKT 2010 06 15 21 59 55 31.3200 -97.3300 251.000 30.0 90.600 3.900 -999.990 -999.990 0.906 ..P WKT 2010 06 15 22 04 55 31.3200 -97.3300 251.000 122.0 94.424 4.640 -999.990 -999.990 0.944 ..P WKT 2010 06 15 22 09 55 31.3200 -97.3300 251.000 457.0 84.739 5.230 -999.990 -999.990 0.847 ..P WKT 2010 06 15 22 19 55 31.3200 -97.3300 251.000 30.0 91.304 4.830 -999.990 -999.990 0.913 ..P WKT 2010 06 15 22 24 55 31.3200 -97.3300 251.000 122.0 95.974 4.340 -999.990 -999.990 0.960 ..P WKT 2010 06 15 22 29 55 31.3200 -97.3300 251.000 457.0 88.516 5.680 -999.990 -999.990 0.885 ..P WKT 2010 06 15 22 34 55 31.3200 -97.3300 251.000 30.0 88.362 5.230 -999.990 -999.990 0.884 ..P WKT 2010 06 15 22 39 55 31.3200 -97.3300 251.000 122.0 96.338 3.640 -999.990 -999.990 0.963 ..P WKT 2010 06 15 22 44 55 31.3200 -97.3300 251.000 457.0 85.851 3.970 -999.990 -999.990 0.859 ..P WKT 2010 06 15 22 54 55 31.3200 -97.3300 251.000 30.0 91.073 3.810 -999.990 -999.990 0.911 ..P WKT 2010 06 15 22 59 55 31.3200 -97.3300 251.000 122.0 100.306 4.450 -999.990 -999.990 1.003 ..P WKT 2010 06 15 23 04 55 31.3200 -97.3300 251.000 457.0 93.559 5.130 -999.990 -999.990 0.936 ..P WKT 2010 06 15 23 09 55 31.3200 -97.3300 251.000 30.0 93.701 3.950 -999.990 -999.990 0.937 ..P WKT 2010 06 15 23 14 55 31.3200 -97.3300 251.000 122.0 101.003 4.380 -999.990 -999.990 1.010 ..P WKT 2010 06 15 23 19 55 31.3200 -97.3300 251.000 457.0 91.780 4.410 -999.990 -999.990 0.918 ..P WKT 2010 06 15 23 29 55 31.3200 -97.3300 251.000 30.0 94.624 4.750 -999.990 -999.990 0.946 ..P WKT 2010 06 15 23 34 55 31.3200 -97.3300 251.000 122.0 97.052 5.130 -999.990 -999.990 0.971 ..P WKT 2010 06 15 23 39 55 31.3200 -97.3300 251.000 457.0 97.001 4.560 -999.990 -999.990 0.970 ..P WKT 2010 06 15 23 44 55 31.3200 -97.3300 251.000 30.0 98.051 4.580 -999.990 -999.990 0.981 ..P WKT 2010 06 15 23 49 55 31.3200 -97.3300 251.000 122.0 105.983 5.210 -999.990 -999.990 1.060 ..P WKT 2010 06 16 00 09 55 31.3200 -97.3300 251.000 457.0 95.128 4.400 -999.990 -999.990 0.951 ..P WKT 2010 06 16 00 10 25 31.3200 -97.3300 251.000 457.0 98.098 4.350 -999.990 -999.990 0.981 ..P WKT 2010 06 16 00 10 55 31.3200 -97.3300 251.000 457.0 96.666 4.290 -999.990 -999.990 0.967 ..P WKT 2010 06 16 00 11 25 31.3200 -97.3300 251.000 457.0 101.013 4.330 -999.990 -999.990 1.010 ..P WKT 2010 06 16 00 11 55 31.3200 -97.3300 251.000 457.0 94.075 4.270 -999.990 -999.990 0.941 ..P WKT 2010 06 16 00 12 25 31.3200 -97.3300 251.000 457.0 101.451 4.490 -999.990 -999.990 1.015 ..P WKT 2010 06 16 00 12 55 31.3200 -97.3300 251.000 457.0 102.220 4.490 -999.990 -999.990 1.022 ..P WKT 2010 06 16 00 13 25 31.3200 -97.3300 251.000 457.0 100.236 4.680 -999.990 -999.990 1.002 ..P WKT 2010 06 16 00 13 55 31.3200 -97.3300 251.000 457.0 101.281 4.470 -999.990 -999.990 1.013 ..P WKT 2010 06 16 00 14 25 31.3200 -97.3300 251.000 457.0 98.195 4.450 -999.990 -999.990 0.982 ..P WKT 2010 06 16 00 14 55 31.3200 -97.3300 251.000 457.0 96.212 4.240 -999.990 -999.990 0.962 ..P WKT 2010 06 16 00 19 55 31.3200 -97.3300 251.000 30.0 104.179 4.360 -999.990 -999.990 1.042 ..P WKT 2010 06 16 00 24 55 31.3200 -97.3300 251.000 122.0 104.989 4.380 -999.990 -999.990 1.050 ..P WKT 2010 06 16 00 29 55 31.3200 -97.3300 251.000 457.0 106.349 4.470 -999.990 -999.990 1.063 ..P WKT 2010 06 16 00 34 55 31.3200 -97.3300 251.000 30.0 104.130 4.100 -999.990 -999.990 1.041 ..P WKT 2010 06 16 00 39 55 31.3200 -97.3300 251.000 122.0 104.389 4.380 -999.990 -999.990 1.044 ..P WKT 2010 06 16 00 44 55 31.3200 -97.3300 251.000 457.0 100.103 4.800 -999.990 -999.990 1.001 ..P WKT 2010 06 16 00 54 55 31.3200 -97.3300 251.000 30.0 99.293 3.790 -999.990 -999.990 0.993 ..P WKT 2010 06 16 00 59 55 31.3200 -97.3300 251.000 122.0 105.939 4.230 -999.990 -999.990 1.059 ..P WKT 2010 06 16 01 04 55 31.3200 -97.3300 251.000 457.0 96.881 4.010 -999.990 -999.990 0.969 ..P WKT 2010 06 16 01 09 55 31.3200 -97.3300 251.000 30.0 99.532 3.950 -999.990 -999.990 0.995 ..P WKT 2010 06 16 01 14 55 31.3200 -97.3300 251.000 122.0 103.699 3.570 -999.990 -999.990 1.037 ..P WKT 2010 06 16 01 19 55 31.3200 -97.3300 251.000 457.0 105.938 3.150 -999.990 -999.990 1.059 ..P WKT 2010 06 16 01 29 55 31.3200 -97.3300 251.000 30.0 103.682 4.050 -999.990 -999.990 1.037 ..P WKT 2010 06 16 01 34 55 31.3200 -97.3300 251.000 122.0 107.044 3.520 -999.990 -999.990 1.070 ..P WKT 2010 06 16 01 39 55 31.3200 -97.3300 251.000 457.0 94.829 3.800 -999.990 -999.990 0.948 ..P WKT 2010 06 16 01 44 55 31.3200 -97.3300 251.000 30.0 100.673 4.130 -999.990 -999.990 1.007 ..P WKT 2010 06 16 01 49 55 31.3200 -97.3300 251.000 122.0 104.311 3.330 -999.990 -999.990 1.043 ..P WKT 2010 06 16 01 54 55 31.3200 -97.3300 251.000 457.0 101.193 3.290 -999.990 -999.990 1.012 ..P WKT 2010 06 16 02 04 55 31.3200 -97.3300 251.000 30.0 106.383 3.250 -999.990 -999.990 1.064 ..P WKT 2010 06 16 02 09 55 31.3200 -97.3300 251.000 122.0 101.177 3.790 -999.990 -999.990 1.012 ..P WKT 2010 06 16 02 14 55 31.3200 -97.3300 251.000 457.0 98.590 3.560 -999.990 -999.990 0.986 ..P WKT 2010 06 16 02 19 55 31.3200 -97.3300 251.000 30.0 109.245 3.400 -999.990 -999.990 1.092 ..P WKT 2010 06 16 02 24 55 31.3200 -97.3300 251.000 122.0 103.485 4.880 -999.990 -999.990 1.035 ..P WKT 2010 06 16 02 29 55 31.3200 -97.3300 251.000 457.0 96.758 3.680 -999.990 -999.990 0.968 ..P WKT 2010 06 16 02 39 55 31.3200 -97.3300 251.000 30.0 102.740 3.670 -999.990 -999.990 1.027 ..P WKT 2010 06 16 02 44 55 31.3200 -97.3300 251.000 122.0 95.852 3.910 -999.990 -999.990 0.959 ..P WKT 2010 06 16 02 49 55 31.3200 -97.3300 251.000 457.0 96.694 3.700 -999.990 -999.990 0.967 ..P WKT 2010 06 16 02 54 55 31.3200 -97.3300 251.000 30.0 102.505 3.490 -999.990 -999.990 1.025 ..P WKT 2010 06 16 02 59 55 31.3200 -97.3300 251.000 122.0 104.176 3.910 -999.990 -999.990 1.042 ..P WKT 2010 06 16 03 04 55 31.3200 -97.3300 251.000 457.0 96.735 3.180 -999.990 -999.990 0.967 ..P WKT 2010 06 16 03 14 55 31.3200 -97.3300 251.000 30.0 94.947 6.220 -999.990 -999.990 0.949 ..P WKT 2010 06 16 03 19 55 31.3200 -97.3300 251.000 122.0 100.880 3.180 -999.990 -999.990 1.009 ..P WKT 2010 06 16 03 24 55 31.3200 -97.3300 251.000 457.0 101.565 3.220 -999.990 -999.990 1.016 ..P WKT 2010 06 16 03 29 55 31.3200 -97.3300 251.000 30.0 106.945 4.030 -999.990 -999.990 1.069 ..P WKT 2010 06 16 03 34 55 31.3200 -97.3300 251.000 122.0 107.355 3.230 -999.990 -999.990 1.074 ..P WKT 2010 06 16 03 39 55 31.3200 -97.3300 251.000 457.0 101.133 3.610 -999.990 -999.990 1.011 ..P WKT 2010 06 16 03 49 55 31.3200 -97.3300 251.000 30.0 103.332 3.410 -999.990 -999.990 1.033 ..P WKT 2010 06 16 03 54 55 31.3200 -97.3300 251.000 122.0 112.032 3.950 -999.990 -999.990 1.120 ..P WKT 2010 06 16 03 59 55 31.3200 -97.3300 251.000 457.0 100.280 3.510 -999.990 -999.990 1.003 ..P WKT 2010 06 16 04 04 55 31.3200 -97.3300 251.000 30.0 102.348 3.920 -999.990 -999.990 1.023 ..P WKT 2010 06 16 04 09 55 31.3200 -97.3300 251.000 122.0 100.545 3.940 -999.990 -999.990 1.005 ..P WKT 2010 06 16 04 14 55 31.3200 -97.3300 251.000 457.0 92.384 3.840 -999.990 -999.990 0.924 ..P WKT 2010 06 16 04 24 55 31.3200 -97.3300 251.000 30.0 105.210 3.890 -999.990 -999.990 1.052 ..P WKT 2010 06 16 04 29 55 31.3200 -97.3300 251.000 122.0 111.268 4.870 -999.990 -999.990 1.113 ..P WKT 2010 06 16 04 34 55 31.3200 -97.3300 251.000 457.0 93.267 4.050 -999.990 -999.990 0.933 ..P WKT 2010 06 16 04 39 55 31.3200 -97.3300 251.000 30.0 113.985 4.460 -999.990 -999.990 1.140 ..P WKT 2010 06 16 04 44 55 31.3200 -97.3300 251.000 122.0 105.524 4.270 -999.990 -999.990 1.055 ..P WKT 2010 06 16 04 49 55 31.3200 -97.3300 251.000 457.0 92.636 3.980 -999.990 -999.990 0.926 ..P WKT 2010 06 16 05 04 55 31.3200 -97.3300 251.000 30.0 110.449 4.110 -999.990 -999.990 1.104 ..P WKT 2010 06 16 05 09 55 31.3200 -97.3300 251.000 122.0 90.868 4.590 -999.990 -999.990 0.909 ..P WKT 2010 06 16 05 14 55 31.3200 -97.3300 251.000 457.0 92.871 4.510 -999.990 -999.990 0.929 ..P WKT 2010 06 16 05 19 55 31.3200 -97.3300 251.000 30.0 103.038 3.680 -999.990 -999.990 1.030 ..P WKT 2010 06 16 05 24 55 31.3200 -97.3300 251.000 122.0 101.858 3.830 -999.990 -999.990 1.019 ..P WKT 2010 06 16 05 29 55 31.3200 -97.3300 251.000 457.0 94.450 4.470 -999.990 -999.990 0.945 ..P WKT 2010 06 16 05 39 55 31.3200 -97.3300 251.000 30.0 105.505 3.590 -999.990 -999.990 1.055 ..P WKT 2010 06 16 05 44 55 31.3200 -97.3300 251.000 122.0 103.067 3.310 -999.990 -999.990 1.031 ..P WKT 2010 06 16 05 49 55 31.3200 -97.3300 251.000 457.0 91.905 3.640 -999.990 -999.990 0.919 ..P WKT 2010 06 16 05 54 55 31.3200 -97.3300 251.000 30.0 105.667 3.820 -999.990 -999.990 1.057 ..P WKT 2010 06 16 05 59 55 31.3200 -97.3300 251.000 122.0 104.890 3.810 -999.990 -999.990 1.049 ..P WKT 2010 06 16 06 04 55 31.3200 -97.3300 251.000 457.0 92.895 3.740 -999.990 -999.990 0.929 ..P WKT 2010 06 16 06 14 55 31.3200 -97.3300 251.000 30.0 108.911 4.080 -999.990 -999.990 1.089 ..P WKT 2010 06 16 06 19 55 31.3200 -97.3300 251.000 122.0 104.513 3.790 -999.990 -999.990 1.045 ..P WKT 2010 06 16 06 24 55 31.3200 -97.3300 251.000 457.0 95.818 3.200 -999.990 -999.990 0.958 ..P WKT 2010 06 16 06 29 55 31.3200 -97.3300 251.000 30.0 110.677 3.560 -999.990 -999.990 1.107 ..P WKT 2010 06 16 06 34 55 31.3200 -97.3300 251.000 122.0 102.675 2.930 -999.990 -999.990 1.027 ..P WKT 2010 06 16 06 39 55 31.3200 -97.3300 251.000 457.0 95.780 3.530 -999.990 -999.990 0.958 ..P WKT 2010 06 16 06 49 55 31.3200 -97.3300 251.000 30.0 109.113 3.010 -999.990 -999.990 1.091 ..P WKT 2010 06 16 06 54 55 31.3200 -97.3300 251.000 122.0 111.188 3.060 -999.990 -999.990 1.112 ..P WKT 2010 06 16 06 59 55 31.3200 -97.3300 251.000 457.0 101.340 3.970 -999.990 -999.990 1.013 ..P WKT 2010 06 16 07 04 55 31.3200 -97.3300 251.000 30.0 107.851 4.820 -999.990 -999.990 1.079 ..P WKT 2010 06 16 07 09 55 31.3200 -97.3300 251.000 122.0 108.540 4.180 -999.990 -999.990 1.085 ..P WKT 2010 06 16 07 14 55 31.3200 -97.3300 251.000 457.0 103.127 3.180 -999.990 -999.990 1.031 ..P WKT 2010 06 16 07 24 55 31.3200 -97.3300 251.000 30.0 105.691 3.320 -999.990 -999.990 1.057 ..P WKT 2010 06 16 07 29 55 31.3200 -97.3300 251.000 122.0 111.175 4.100 -999.990 -999.990 1.112 ..P WKT 2010 06 16 07 34 55 31.3200 -97.3300 251.000 457.0 98.903 5.670 -999.990 -999.990 0.989 ..P WKT 2010 06 16 07 39 55 31.3200 -97.3300 251.000 30.0 100.225 6.610 -999.990 -999.990 1.002 ..P WKT 2010 06 16 07 44 55 31.3200 -97.3300 251.000 122.0 103.767 5.600 -999.990 -999.990 1.038 ..P WKT 2010 06 16 07 49 55 31.3200 -97.3300 251.000 457.0 90.936 4.620 -999.990 -999.990 0.909 ..P WKT 2010 06 16 07 59 55 31.3200 -97.3300 251.000 30.0 98.179 4.780 -999.990 -999.990 0.982 ..P WKT 2010 06 16 08 04 55 31.3200 -97.3300 251.000 122.0 98.550 5.370 -999.990 -999.990 0.986 ..P WKT 2010 06 16 08 09 55 31.3200 -97.3300 251.000 457.0 95.034 6.320 -999.990 -999.990 0.950 ..P WKT 2010 06 16 08 14 55 31.3200 -97.3300 251.000 30.0 103.456 4.950 -999.990 -999.990 1.035 ..P WKT 2010 06 16 08 19 55 31.3200 -97.3300 251.000 122.0 101.606 4.140 -999.990 -999.990 1.016 ..P WKT 2010 06 16 08 24 55 31.3200 -97.3300 251.000 457.0 100.589 3.660 -999.990 -999.990 1.006 ..P WKT 2010 06 16 08 34 55 31.3200 -97.3300 251.000 30.0 110.536 4.290 -999.990 -999.990 1.105 ..P WKT 2010 06 16 08 39 55 31.3200 -97.3300 251.000 122.0 119.559 4.090 -999.990 -999.990 1.196 ..P WKT 2010 06 16 08 44 55 31.3200 -97.3300 251.000 457.0 94.971 4.610 -999.990 -999.990 0.950 ..P WKT 2010 06 16 08 49 55 31.3200 -97.3300 251.000 30.0 110.660 3.800 -999.990 -999.990 1.107 ..P WKT 2010 06 16 08 54 55 31.3200 -97.3300 251.000 122.0 112.323 3.810 -999.990 -999.990 1.123 ..P WKT 2010 06 16 08 59 55 31.3200 -97.3300 251.000 457.0 93.562 3.280 -999.990 -999.990 0.936 ..P WKT 2010 06 16 09 09 55 31.3200 -97.3300 251.000 30.0 105.560 3.810 -999.990 -999.990 1.056 ..P WKT 2010 06 16 09 14 55 31.3200 -97.3300 251.000 122.0 106.865 3.680 -999.990 -999.990 1.069 ..P WKT 2010 06 16 09 19 55 31.3200 -97.3300 251.000 457.0 91.492 3.510 -999.990 -999.990 0.915 ..P WKT 2010 06 16 09 24 55 31.3200 -97.3300 251.000 30.0 108.224 3.420 -999.990 -999.990 1.082 ..P WKT 2010 06 16 09 29 55 31.3200 -97.3300 251.000 122.0 102.024 4.130 -999.990 -999.990 1.020 ..P WKT 2010 06 16 09 34 55 31.3200 -97.3300 251.000 457.0 88.870 5.570 -999.990 -999.990 0.889 ..P WKT 2010 06 16 09 44 55 31.3200 -97.3300 251.000 30.0 109.316 5.270 -999.990 -999.990 1.093 ..P WKT 2010 06 16 09 49 55 31.3200 -97.3300 251.000 122.0 109.966 3.520 -999.990 -999.990 1.100 ..P WKT 2010 06 16 09 54 55 31.3200 -97.3300 251.000 457.0 90.869 3.210 -999.990 -999.990 0.909 ..P WKT 2010 06 16 09 59 55 31.3200 -97.3300 251.000 30.0 109.181 3.610 -999.990 -999.990 1.092 ..P WKT 2010 06 16 10 04 55 31.3200 -97.3300 251.000 122.0 109.554 3.350 -999.990 -999.990 1.096 ..P WKT 2010 06 16 10 09 55 31.3200 -97.3300 251.000 457.0 88.366 3.040 -999.990 -999.990 0.884 ..P WKT 2010 06 16 10 19 55 31.3200 -97.3300 251.000 30.0 109.818 3.230 -999.990 -999.990 1.098 ..P WKT 2010 06 16 10 24 55 31.3200 -97.3300 251.000 122.0 109.752 3.450 -999.990 -999.990 1.098 ..P WKT 2010 06 16 10 29 55 31.3200 -97.3300 251.000 457.0 94.520 4.310 -999.990 -999.990 0.945 ..P WKT 2010 06 16 10 34 55 31.3200 -97.3300 251.000 30.0 110.597 3.240 -999.990 -999.990 1.106 ..P WKT 2010 06 16 10 39 55 31.3200 -97.3300 251.000 122.0 116.239 3.640 -999.990 -999.990 1.162 ..P WKT 2010 06 16 10 44 55 31.3200 -97.3300 251.000 457.0 95.019 2.870 -999.990 -999.990 0.950 ..P WKT 2010 06 16 10 54 55 31.3200 -97.3300 251.000 30.0 107.894 3.880 -999.990 -999.990 1.079 ..P WKT 2010 06 16 10 59 55 31.3200 -97.3300 251.000 122.0 120.279 3.660 -999.990 -999.990 1.203 ..P WKT 2010 06 16 11 04 55 31.3200 -97.3300 251.000 457.0 91.732 3.340 -999.990 -999.990 0.917 ..P WKT 2010 06 16 11 09 55 31.3200 -97.3300 251.000 30.0 103.840 2.860 -999.990 -999.990 1.038 ..P WKT 2010 06 16 11 14 55 31.3200 -97.3300 251.000 122.0 105.088 2.760 -999.990 -999.990 1.051 ..P WKT 2010 06 16 11 19 55 31.3200 -97.3300 251.000 457.0 100.765 4.150 -999.990 -999.990 1.008 ..P WKT 2010 06 16 11 29 55 31.3200 -97.3300 251.000 30.0 112.753 4.690 -999.990 -999.990 1.128 ..P WKT 2010 06 16 11 34 55 31.3200 -97.3300 251.000 122.0 109.842 3.670 -999.990 -999.990 1.098 ..P WKT 2010 06 16 11 39 55 31.3200 -97.3300 251.000 457.0 104.146 2.690 -999.990 -999.990 1.041 ..P WKT 2010 06 16 11 44 55 31.3200 -97.3300 251.000 30.0 109.037 3.250 -999.990 -999.990 1.090 ..P WKT 2010 06 16 11 49 55 31.3200 -97.3300 251.000 122.0 102.781 2.920 -999.990 -999.990 1.028 ..P WKT 2010 06 16 12 09 55 31.3200 -97.3300 251.000 457.0 96.978 2.660 -999.990 -999.990 0.970 ..P WKT 2010 06 16 12 10 25 31.3200 -97.3300 251.000 457.0 94.177 4.070 -999.990 -999.990 0.942 ..P WKT 2010 06 16 12 10 55 31.3200 -97.3300 251.000 457.0 100.297 3.580 -999.990 -999.990 1.003 ..P WKT 2010 06 16 12 11 25 31.3200 -97.3300 251.000 457.0 95.264 3.570 -999.990 -999.990 0.953 ..P WKT 2010 06 16 12 11 55 31.3200 -97.3300 251.000 457.0 96.924 2.690 -999.990 -999.990 0.969 ..P WKT 2010 06 16 12 12 25 31.3200 -97.3300 251.000 457.0 94.400 2.690 -999.990 -999.990 0.944 ..P WKT 2010 06 16 12 12 55 31.3200 -97.3300 251.000 457.0 95.502 3.870 -999.990 -999.990 0.955 ..P WKT 2010 06 16 12 13 25 31.3200 -97.3300 251.000 457.0 98.277 4.050 -999.990 -999.990 0.983 ..P WKT 2010 06 16 12 13 55 31.3200 -97.3300 251.000 457.0 95.475 3.360 -999.990 -999.990 0.955 ..P WKT 2010 06 16 12 14 25 31.3200 -97.3300 251.000 457.0 97.971 2.850 -999.990 -999.990 0.980 ..P WKT 2010 06 16 12 14 55 31.3200 -97.3300 251.000 457.0 96.842 2.750 -999.990 -999.990 0.968 ..P WKT 2010 06 16 12 19 55 31.3200 -97.3300 251.000 30.0 101.168 2.880 -999.990 -999.990 1.012 ..P WKT 2010 06 16 12 24 55 31.3200 -97.3300 251.000 122.0 108.563 4.240 -999.990 -999.990 1.086 ..P WKT 2010 06 16 12 29 55 31.3200 -97.3300 251.000 457.0 102.431 3.170 -999.990 -999.990 1.024 ..P WKT 2010 06 16 12 34 55 31.3200 -97.3300 251.000 30.0 110.666 4.450 -999.990 -999.990 1.107 ..P WKT 2010 06 16 12 39 55 31.3200 -97.3300 251.000 122.0 108.996 3.430 -999.990 -999.990 1.090 ..P WKT 2010 06 16 12 44 55 31.3200 -97.3300 251.000 457.0 91.556 3.370 -999.990 -999.990 0.916 ..P WKT 2010 06 16 12 54 55 31.3200 -97.3300 251.000 30.0 102.045 4.280 -999.990 -999.990 1.020 ..P WKT 2010 06 16 12 59 55 31.3200 -97.3300 251.000 122.0 105.974 3.990 -999.990 -999.990 1.060 ..P WKT 2010 06 16 13 04 55 31.3200 -97.3300 251.000 457.0 96.778 3.960 -999.990 -999.990 0.968 ..P WKT 2010 06 16 13 09 55 31.3200 -97.3300 251.000 30.0 106.014 3.610 -999.990 -999.990 1.060 ..P WKT 2010 06 16 13 14 55 31.3200 -97.3300 251.000 122.0 107.710 3.990 -999.990 -999.990 1.077 ..P WKT 2010 06 16 13 19 55 31.3200 -97.3300 251.000 457.0 100.884 3.740 -999.990 -999.990 1.009 ..P WKT 2010 06 16 13 29 55 31.3200 -97.3300 251.000 30.0 112.102 4.580 -999.990 -999.990 1.121 ..P WKT 2010 06 16 13 34 55 31.3200 -97.3300 251.000 122.0 111.564 4.480 -999.990 -999.990 1.116 ..P WKT 2010 06 16 13 39 55 31.3200 -97.3300 251.000 457.0 100.821 3.820 -999.990 -999.990 1.008 ..P WKT 2010 06 16 13 44 55 31.3200 -97.3300 251.000 30.0 109.089 4.730 -999.990 -999.990 1.091 ..P WKT 2010 06 16 13 49 55 31.3200 -97.3300 251.000 122.0 118.617 5.310 -999.990 -999.990 1.186 ..P WKT 2010 06 16 13 54 55 31.3200 -97.3300 251.000 457.0 102.696 3.760 -999.990 -999.990 1.027 ..P WKT 2010 06 16 14 04 55 31.3200 -97.3300 251.000 30.0 106.951 3.960 -999.990 -999.990 1.070 ..P WKT 2010 06 16 14 09 55 31.3200 -97.3300 251.000 122.0 109.510 4.100 -999.990 -999.990 1.095 ..P WKT 2010 06 16 14 14 55 31.3200 -97.3300 251.000 457.0 98.915 4.620 -999.990 -999.990 0.989 ..P WKT 2010 06 16 14 19 55 31.3200 -97.3300 251.000 30.0 106.792 3.650 -999.990 -999.990 1.068 ..P WKT 2010 06 16 14 24 55 31.3200 -97.3300 251.000 122.0 107.112 3.850 -999.990 -999.990 1.071 ..P WKT 2010 06 16 14 29 55 31.3200 -97.3300 251.000 457.0 101.831 3.600 -999.990 -999.990 1.018 ..P WKT 2010 06 16 14 39 55 31.3200 -97.3300 251.000 30.0 107.811 3.100 -999.990 -999.990 1.078 ..P WKT 2010 06 16 14 44 55 31.3200 -97.3300 251.000 122.0 111.794 3.500 -999.990 -999.990 1.118 ..P WKT 2010 06 16 14 49 55 31.3200 -97.3300 251.000 457.0 105.970 4.910 -999.990 -999.990 1.060 ..P WKT 2010 06 16 14 54 55 31.3200 -97.3300 251.000 30.0 99.586 3.250 -999.990 -999.990 0.996 ..P WKT 2010 06 16 14 59 55 31.3200 -97.3300 251.000 122.0 102.728 3.290 -999.990 -999.990 1.027 ..P WKT 2010 06 16 15 04 55 31.3200 -97.3300 251.000 457.0 94.098 3.280 -999.990 -999.990 0.941 ..P WKT 2010 06 16 15 14 55 31.3200 -97.3300 251.000 30.0 98.940 3.100 -999.990 -999.990 0.989 ..P WKT 2010 06 16 15 19 55 31.3200 -97.3300 251.000 122.0 96.435 3.310 -999.990 -999.990 0.964 ..P WKT 2010 06 16 15 24 55 31.3200 -97.3300 251.000 457.0 95.612 3.900 -999.990 -999.990 0.956 ..P WKT 2010 06 16 15 29 55 31.3200 -97.3300 251.000 30.0 102.363 3.570 -999.990 -999.990 1.024 ..P WKT 2010 06 16 15 34 55 31.3200 -97.3300 251.000 122.0 102.382 2.710 -999.990 -999.990 1.024 ..P WKT 2010 06 16 15 39 55 31.3200 -97.3300 251.000 457.0 98.754 2.980 -999.990 -999.990 0.988 ..P WKT 2010 06 16 15 49 55 31.3200 -97.3300 251.000 30.0 102.280 3.210 -999.990 -999.990 1.023 ..P WKT 2010 06 16 15 54 55 31.3200 -97.3300 251.000 122.0 104.665 3.260 -999.990 -999.990 1.047 ..P WKT 2010 06 16 15 59 55 31.3200 -97.3300 251.000 457.0 100.313 3.720 -999.990 -999.990 1.003 ..P WKT 2010 06 16 16 04 55 31.3200 -97.3300 251.000 30.0 97.083 4.570 -999.990 -999.990 0.971 ..P WKT 2010 06 16 16 09 55 31.3200 -97.3300 251.000 122.0 108.736 4.220 -999.990 -999.990 1.087 ..P WKT 2010 06 16 16 14 55 31.3200 -97.3300 251.000 457.0 99.327 4.590 -999.990 -999.990 0.993 ..P WKT 2010 06 16 16 24 55 31.3200 -97.3300 251.000 30.0 103.177 6.700 -999.990 -999.990 1.032 ..P WKT 2010 06 16 16 29 55 31.3200 -97.3300 251.000 122.0 100.990 5.770 -999.990 -999.990 1.010 ..P WKT 2010 06 16 16 34 55 31.3200 -97.3300 251.000 457.0 98.238 5.350 -999.990 -999.990 0.982 ..P WKT 2010 06 16 16 39 55 31.3200 -97.3300 251.000 30.0 100.546 4.990 -999.990 -999.990 1.005 ..P WKT 2010 06 16 16 44 55 31.3200 -97.3300 251.000 122.0 106.087 5.330 -999.990 -999.990 1.061 ..P WKT 2010 06 16 16 49 55 31.3200 -97.3300 251.000 457.0 96.869 4.640 -999.990 -999.990 0.969 ..P WKT 2010 06 16 17 04 55 31.3200 -97.3300 251.000 30.0 100.798 5.370 -999.990 -999.990 1.008 ..P WKT 2010 06 16 17 09 55 31.3200 -97.3300 251.000 122.0 100.342 4.940 -999.990 -999.990 1.003 ..P WKT 2010 06 16 17 14 55 31.3200 -97.3300 251.000 457.0 91.867 4.240 -999.990 -999.990 0.919 ..P WKT 2010 06 16 17 19 55 31.3200 -97.3300 251.000 30.0 97.038 4.330 -999.990 -999.990 0.970 ..P WKT 2010 06 16 17 24 55 31.3200 -97.3300 251.000 122.0 101.648 5.390 -999.990 -999.990 1.016 ..P WKT 2010 06 16 17 29 55 31.3200 -97.3300 251.000 457.0 89.368 4.200 -999.990 -999.990 0.894 ..P WKT 2010 06 16 17 39 55 31.3200 -97.3300 251.000 30.0 98.463 4.870 -999.990 -999.990 0.985 ..P WKT 2010 06 16 17 44 55 31.3200 -97.3300 251.000 122.0 96.751 4.540 -999.990 -999.990 0.968 ..P WKT 2010 06 16 17 49 55 31.3200 -97.3300 251.000 457.0 91.377 3.660 -999.990 -999.990 0.914 ..P WKT 2010 06 16 17 54 55 31.3200 -97.3300 251.000 30.0 87.833 2.910 -999.990 -999.990 0.878 ..P WKT 2010 06 16 17 59 55 31.3200 -97.3300 251.000 122.0 95.558 3.360 -999.990 -999.990 0.956 ..P WKT 2010 06 16 18 04 55 31.3200 -97.3300 251.000 457.0 93.564 3.080 -999.990 -999.990 0.936 ..P WKT 2010 06 16 18 14 55 31.3200 -97.3300 251.000 30.0 87.801 2.630 -999.990 -999.990 0.878 ..P WKT 2010 06 16 18 19 55 31.3200 -97.3300 251.000 122.0 94.887 2.690 -999.990 -999.990 0.949 ..P WKT 2010 06 16 18 24 55 31.3200 -97.3300 251.000 457.0 87.171 4.860 -999.990 -999.990 0.872 ..P WKT 2010 06 16 18 29 55 31.3200 -97.3300 251.000 30.0 90.169 4.650 -999.990 -999.990 0.902 ..P WKT 2010 06 16 18 34 55 31.3200 -97.3300 251.000 122.0 98.529 3.280 -999.990 -999.990 0.985 ..P WKT 2010 06 16 18 39 55 31.3200 -97.3300 251.000 457.0 84.039 3.230 -999.990 -999.990 0.840 ..P WKT 2010 06 16 18 49 55 31.3200 -97.3300 251.000 30.0 93.224 2.890 -999.990 -999.990 0.932 ..P WKT 2010 06 16 18 54 55 31.3200 -97.3300 251.000 122.0 98.000 3.550 -999.990 -999.990 0.980 ..P WKT 2010 06 16 18 59 55 31.3200 -97.3300 251.000 457.0 94.308 4.600 -999.990 -999.990 0.943 ..P WKT 2010 06 16 19 04 55 31.3200 -97.3300 251.000 30.0 97.674 5.480 -999.990 -999.990 0.977 ..P WKT 2010 06 16 19 09 55 31.3200 -97.3300 251.000 122.0 102.735 4.660 -999.990 -999.990 1.027 ..P WKT 2010 06 16 19 14 55 31.3200 -97.3300 251.000 457.0 91.982 3.350 -999.990 -999.990 0.920 ..P WKT 2010 06 16 19 24 55 31.3200 -97.3300 251.000 30.0 94.319 3.230 -999.990 -999.990 0.943 ..P WKT 2010 06 16 19 29 55 31.3200 -97.3300 251.000 122.0 99.503 5.410 -999.990 -999.990 0.995 ..P WKT 2010 06 16 19 34 55 31.3200 -97.3300 251.000 457.0 91.973 5.470 -999.990 -999.990 0.920 ..P WKT 2010 06 16 19 39 55 31.3200 -97.3300 251.000 30.0 92.637 5.530 -999.990 -999.990 0.926 ..P WKT 2010 06 16 19 44 55 31.3200 -97.3300 251.000 122.0 102.346 3.420 -999.990 -999.990 1.023 ..P WKT 2010 06 16 19 49 55 31.3200 -97.3300 251.000 457.0 82.657 3.960 -999.990 -999.990 0.827 ..P WKT 2010 06 16 19 59 55 31.3200 -97.3300 251.000 30.0 90.810 4.170 -999.990 -999.990 0.908 ..P WKT 2010 06 16 20 04 55 31.3200 -97.3300 251.000 122.0 100.566 5.000 -999.990 -999.990 1.006 ..P WKT 2010 06 16 20 09 55 31.3200 -97.3300 251.000 457.0 88.259 3.540 -999.990 -999.990 0.883 ..P WKT 2010 06 16 20 14 55 31.3200 -97.3300 251.000 30.0 92.642 3.840 -999.990 -999.990 0.926 ..P WKT 2010 06 16 20 19 55 31.3200 -97.3300 251.000 122.0 94.197 4.470 -999.990 -999.990 0.942 ..P WKT 2010 06 16 20 24 55 31.3200 -97.3300 251.000 457.0 85.421 3.580 -999.990 -999.990 0.854 ..P WKT 2010 06 16 20 34 55 31.3200 -97.3300 251.000 30.0 96.294 3.610 -999.990 -999.990 0.963 ..P WKT 2010 06 16 20 39 55 31.3200 -97.3300 251.000 122.0 98.112 3.440 -999.990 -999.990 0.981 ..P WKT 2010 06 16 20 44 55 31.3200 -97.3300 251.000 457.0 86.763 4.400 -999.990 -999.990 0.868 ..P WKT 2010 06 16 20 49 55 31.3200 -97.3300 251.000 30.0 91.272 3.970 -999.990 -999.990 0.913 ..P WKT 2010 06 16 20 54 55 31.3200 -97.3300 251.000 122.0 98.331 3.210 -999.990 -999.990 0.983 ..P WKT 2010 06 16 20 59 55 31.3200 -97.3300 251.000 457.0 91.652 3.120 -999.990 -999.990 0.917 ..P WKT 2010 06 16 21 09 55 31.3200 -97.3300 251.000 30.0 94.218 5.450 -999.990 -999.990 0.942 ..P WKT 2010 06 16 21 14 55 31.3200 -97.3300 251.000 122.0 101.768 4.000 -999.990 -999.990 1.018 ..P WKT 2010 06 16 21 19 55 31.3200 -97.3300 251.000 457.0 99.964 3.480 -999.990 -999.990 1.000 ..P WKT 2010 06 16 21 24 55 31.3200 -97.3300 251.000 30.0 96.885 2.960 -999.990 -999.990 0.969 ..P WKT 2010 06 16 21 29 55 31.3200 -97.3300 251.000 122.0 100.043 3.080 -999.990 -999.990 1.000 ..P WKT 2010 06 16 21 34 55 31.3200 -97.3300 251.000 457.0 93.843 2.940 -999.990 -999.990 0.938 ..P WKT 2010 06 16 21 44 55 31.3200 -97.3300 251.000 30.0 99.533 4.160 -999.990 -999.990 0.995 ..P WKT 2010 06 16 21 49 55 31.3200 -97.3300 251.000 122.0 106.747 3.380 -999.990 -999.990 1.067 ..P WKT 2010 06 16 21 54 55 31.3200 -97.3300 251.000 457.0 102.045 2.950 -999.990 -999.990 1.020 ..P WKT 2010 06 16 21 59 55 31.3200 -97.3300 251.000 30.0 101.740 3.330 -999.990 -999.990 1.017 ..P WKT 2010 06 16 22 04 55 31.3200 -97.3300 251.000 122.0 114.635 3.190 -999.990 -999.990 1.146 ..P WKT 2010 06 16 22 09 55 31.3200 -97.3300 251.000 457.0 97.723 2.820 -999.990 -999.990 0.977 ..P WKT 2010 06 16 22 19 55 31.3200 -97.3300 251.000 30.0 100.824 2.700 -999.990 -999.990 1.008 ..P WKT 2010 06 16 22 24 55 31.3200 -97.3300 251.000 122.0 101.107 3.510 -999.990 -999.990 1.011 ..P WKT 2010 06 16 22 29 55 31.3200 -97.3300 251.000 457.0 98.691 3.290 -999.990 -999.990 0.987 ..P WKT 2010 06 16 22 34 55 31.3200 -97.3300 251.000 30.0 93.291 4.230 -999.990 -999.990 0.933 ..P WKT 2010 06 16 22 39 55 31.3200 -97.3300 251.000 122.0 100.109 3.440 -999.990 -999.990 1.001 ..P WKT 2010 06 16 22 44 55 31.3200 -97.3300 251.000 457.0 93.003 2.970 -999.990 -999.990 0.930 ..P WKT 2010 06 16 22 54 55 31.3200 -97.3300 251.000 30.0 96.309 4.820 -999.990 -999.990 0.963 ..P WKT 2010 06 16 22 59 55 31.3200 -97.3300 251.000 122.0 100.187 3.640 -999.990 -999.990 1.002 ..P WKT 2010 06 16 23 04 55 31.3200 -97.3300 251.000 457.0 95.818 4.340 -999.990 -999.990 0.958 ..P WKT 2010 06 16 23 09 55 31.3200 -97.3300 251.000 30.0 94.577 3.830 -999.990 -999.990 0.946 ..P WKT 2010 06 16 23 14 55 31.3200 -97.3300 251.000 122.0 105.853 4.070 -999.990 -999.990 1.059 ..P WKT 2010 06 16 23 19 55 31.3200 -97.3300 251.000 457.0 98.069 2.940 -999.990 -999.990 0.981 ..P WKT 2010 06 16 23 29 55 31.3200 -97.3300 251.000 30.0 96.242 2.490 -999.990 -999.990 0.962 ..P WKT 2010 06 16 23 34 55 31.3200 -97.3300 251.000 122.0 95.940 3.600 -999.990 -999.990 0.959 ..P WKT 2010 06 16 23 39 55 31.3200 -97.3300 251.000 457.0 88.521 4.640 -999.990 -999.990 0.885 ..P WKT 2010 06 16 23 44 55 31.3200 -97.3300 251.000 30.0 97.900 4.570 -999.990 -999.990 0.979 ..P WKT 2010 06 16 23 49 55 31.3200 -97.3300 251.000 122.0 103.578 5.130 -999.990 -999.990 1.036 ..P WKT 2010 06 17 00 09 55 31.3200 -97.3300 251.000 457.0 87.668 3.510 -999.990 -999.990 0.877 ..P WKT 2010 06 17 00 10 25 31.3200 -97.3300 251.000 457.0 88.053 3.560 -999.990 -999.990 0.881 ..P WKT 2010 06 17 00 10 55 31.3200 -97.3300 251.000 457.0 88.724 3.370 -999.990 -999.990 0.887 ..P WKT 2010 06 17 00 11 25 31.3200 -97.3300 251.000 457.0 89.963 4.190 -999.990 -999.990 0.900 ..P WKT 2010 06 17 00 11 55 31.3200 -97.3300 251.000 457.0 94.336 3.640 -999.990 -999.990 0.943 ..P WKT 2010 06 17 00 12 25 31.3200 -97.3300 251.000 457.0 93.298 3.720 -999.990 -999.990 0.933 ..P WKT 2010 06 17 00 12 55 31.3200 -97.3300 251.000 457.0 87.703 3.420 -999.990 -999.990 0.877 ..P WKT 2010 06 17 00 13 25 31.3200 -97.3300 251.000 457.0 89.796 3.650 -999.990 -999.990 0.898 ..P WKT 2010 06 17 00 13 55 31.3200 -97.3300 251.000 457.0 85.057 3.640 -999.990 -999.990 0.851 ..P WKT 2010 06 17 00 14 25 31.3200 -97.3300 251.000 457.0 88.289 3.510 -999.990 -999.990 0.883 ..P WKT 2010 06 17 00 14 55 31.3200 -97.3300 251.000 457.0 88.960 4.360 -999.990 -999.990 0.890 ..P WKT 2010 06 17 00 19 55 31.3200 -97.3300 251.000 30.0 89.113 4.220 -999.990 -999.990 0.891 ..P WKT 2010 06 17 00 24 55 31.3200 -97.3300 251.000 122.0 95.956 4.520 -999.990 -999.990 0.960 ..P WKT 2010 06 17 00 29 55 31.3200 -97.3300 251.000 457.0 93.261 4.320 -999.990 -999.990 0.933 ..P WKT 2010 06 17 00 34 55 31.3200 -97.3300 251.000 30.0 91.706 4.510 -999.990 -999.990 0.917 ..P WKT 2010 06 17 00 39 55 31.3200 -97.3300 251.000 122.0 98.546 5.110 -999.990 -999.990 0.985 ..P WKT 2010 06 17 00 44 55 31.3200 -97.3300 251.000 457.0 100.690 3.780 -999.990 -999.990 1.007 ..P WKT 2010 06 17 00 54 55 31.3200 -97.3300 251.000 30.0 102.322 4.110 -999.990 -999.990 1.023 ..P WKT 2010 06 17 00 59 55 31.3200 -97.3300 251.000 122.0 107.074 3.840 -999.990 -999.990 1.071 ..P WKT 2010 06 17 01 04 55 31.3200 -97.3300 251.000 457.0 101.728 4.400 -999.990 -999.990 1.017 ..P WKT 2010 06 17 01 09 55 31.3200 -97.3300 251.000 30.0 104.773 3.980 -999.990 -999.990 1.048 ..P WKT 2010 06 17 01 14 55 31.3200 -97.3300 251.000 122.0 110.517 4.080 -999.990 -999.990 1.105 ..P WKT 2010 06 17 01 19 55 31.3200 -97.3300 251.000 457.0 91.527 4.310 -999.990 -999.990 0.915 ..P WKT 2010 06 17 01 29 55 31.3200 -97.3300 251.000 30.0 108.456 3.900 -999.990 -999.990 1.085 ..P WKT 2010 06 17 01 34 55 31.3200 -97.3300 251.000 122.0 107.986 3.710 -999.990 -999.990 1.080 ..P WKT 2010 06 17 01 39 55 31.3200 -97.3300 251.000 457.0 99.986 3.440 -999.990 -999.990 1.000 ..P WKT 2010 06 17 01 44 55 31.3200 -97.3300 251.000 30.0 110.598 3.280 -999.990 -999.990 1.106 ..P WKT 2010 06 17 01 49 55 31.3200 -97.3300 251.000 122.0 104.162 3.090 -999.990 -999.990 1.042 ..P WKT 2010 06 17 01 54 55 31.3200 -97.3300 251.000 457.0 99.006 3.010 -999.990 -999.990 0.990 ..P WKT 2010 06 17 02 04 55 31.3200 -97.3300 251.000 30.0 100.219 2.630 -999.990 -999.990 1.002 ..P WKT 2010 06 17 02 09 55 31.3200 -97.3300 251.000 122.0 105.307 3.210 -999.990 -999.990 1.053 ..P WKT 2010 06 17 02 14 55 31.3200 -97.3300 251.000 457.0 102.161 2.980 -999.990 -999.990 1.022 ..P WKT 2010 06 17 02 19 55 31.3200 -97.3300 251.000 30.0 96.888 2.850 -999.990 -999.990 0.969 ..P WKT 2010 06 17 02 24 55 31.3200 -97.3300 251.000 122.0 102.825 2.480 -999.990 -999.990 1.028 ..P WKT 2010 06 17 02 29 55 31.3200 -97.3300 251.000 457.0 107.910 2.790 -999.990 -999.990 1.079 ..P WKT 2010 06 17 02 39 55 31.3200 -97.3300 251.000 30.0 99.799 2.420 -999.990 -999.990 0.998 ..P WKT 2010 06 17 02 44 55 31.3200 -97.3300 251.000 122.0 107.881 2.320 -999.990 -999.990 1.079 ..P WKT 2010 06 17 02 49 55 31.3200 -97.3300 251.000 457.0 96.674 2.420 -999.990 -999.990 0.967 ..P WKT 2010 06 17 02 54 55 31.3200 -97.3300 251.000 30.0 95.397 3.880 -999.990 -999.990 0.954 ..P WKT 2010 06 17 02 59 55 31.3200 -97.3300 251.000 122.0 99.506 2.770 -999.990 -999.990 0.995 ..P WKT 2010 06 17 03 04 55 31.3200 -97.3300 251.000 457.0 91.709 3.180 -999.990 -999.990 0.917 ..P WKT 2010 06 17 03 14 55 31.3200 -97.3300 251.000 30.0 94.541 3.590 -999.990 -999.990 0.945 ..P WKT 2010 06 17 03 19 55 31.3200 -97.3300 251.000 122.0 93.831 3.360 -999.990 -999.990 0.938 ..P WKT 2010 06 17 03 24 55 31.3200 -97.3300 251.000 457.0 88.587 4.090 -999.990 -999.990 0.886 ..P WKT 2010 06 17 03 29 55 31.3200 -97.3300 251.000 30.0 92.412 4.740 -999.990 -999.990 0.924 ..P WKT 2010 06 17 03 34 55 31.3200 -97.3300 251.000 122.0 99.917 4.330 -999.990 -999.990 0.999 ..P WKT 2010 06 17 03 39 55 31.3200 -97.3300 251.000 457.0 81.646 3.780 -999.990 -999.990 0.816 ..P WKT 2010 06 17 03 49 55 31.3200 -97.3300 251.000 30.0 93.297 3.120 -999.990 -999.990 0.933 ..P WKT 2010 06 17 03 54 55 31.3200 -97.3300 251.000 122.0 95.743 4.480 -999.990 -999.990 0.957 ..P WKT 2010 06 17 03 59 55 31.3200 -97.3300 251.000 457.0 79.787 4.840 -999.990 -999.990 0.798 ..P WKT 2010 06 17 04 04 55 31.3200 -97.3300 251.000 30.0 84.498 3.950 -999.990 -999.990 0.845 ..P WKT 2010 06 17 04 09 55 31.3200 -97.3300 251.000 122.0 85.812 3.720 -999.990 -999.990 0.858 ..P WKT 2010 06 17 04 14 55 31.3200 -97.3300 251.000 457.0 83.730 3.060 -999.990 -999.990 0.837 ..P WKT 2010 06 17 04 24 55 31.3200 -97.3300 251.000 30.0 89.631 3.330 -999.990 -999.990 0.896 ..P WKT 2010 06 17 04 29 55 31.3200 -97.3300 251.000 122.0 94.358 3.090 -999.990 -999.990 0.944 ..P WKT 2010 06 17 04 34 55 31.3200 -97.3300 251.000 457.0 88.760 3.480 -999.990 -999.990 0.888 ..P WKT 2010 06 17 04 39 55 31.3200 -97.3300 251.000 30.0 90.659 3.750 -999.990 -999.990 0.907 ..P WKT 2010 06 17 04 44 55 31.3200 -97.3300 251.000 122.0 90.577 3.880 -999.990 -999.990 0.906 ..P WKT 2010 06 17 04 49 55 31.3200 -97.3300 251.000 457.0 86.396 3.570 -999.990 -999.990 0.864 ..P WKT 2010 06 17 05 04 55 31.3200 -97.3300 251.000 30.0 89.382 4.430 -999.990 -999.990 0.894 ..P WKT 2010 06 17 05 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 06 17 05 14 55 31.3200 -97.3300 251.000 457.0 79.735 4.230 -999.990 -999.990 0.797 ..P WKT 2010 06 17 05 19 55 31.3200 -97.3300 251.000 30.0 83.246 4.460 -999.990 -999.990 0.832 ..P WKT 2010 06 17 05 24 55 31.3200 -97.3300 251.000 122.0 95.937 3.670 -999.990 -999.990 0.959 ..P WKT 2010 06 17 05 29 55 31.3200 -97.3300 251.000 457.0 83.771 3.900 -999.990 -999.990 0.838 ..P WKT 2010 06 17 05 39 55 31.3200 -97.3300 251.000 30.0 84.658 4.940 -999.990 -999.990 0.847 ..P WKT 2010 06 17 05 44 55 31.3200 -97.3300 251.000 122.0 86.554 4.390 -999.990 -999.990 0.866 ..P WKT 2010 06 17 05 49 55 31.3200 -97.3300 251.000 457.0 85.343 4.440 -999.990 -999.990 0.853 ..P WKT 2010 06 17 05 54 55 31.3200 -97.3300 251.000 30.0 88.932 4.820 -999.990 -999.990 0.889 ..P WKT 2010 06 17 05 59 55 31.3200 -97.3300 251.000 122.0 92.378 4.520 -999.990 -999.990 0.924 ..P WKT 2010 06 17 06 04 55 31.3200 -97.3300 251.000 457.0 83.972 4.400 -999.990 -999.990 0.840 ..P WKT 2010 06 17 06 14 55 31.3200 -97.3300 251.000 30.0 89.796 4.040 -999.990 -999.990 0.898 ..P WKT 2010 06 17 06 19 55 31.3200 -97.3300 251.000 122.0 95.134 4.170 -999.990 -999.990 0.951 ..P WKT 2010 06 17 06 24 55 31.3200 -97.3300 251.000 457.0 81.998 4.910 -999.990 -999.990 0.820 ..P WKT 2010 06 17 06 29 55 31.3200 -97.3300 251.000 30.0 89.733 3.890 -999.990 -999.990 0.897 ..P WKT 2010 06 17 06 34 55 31.3200 -97.3300 251.000 122.0 95.774 3.430 -999.990 -999.990 0.958 ..P WKT 2010 06 17 06 39 55 31.3200 -97.3300 251.000 457.0 77.851 3.050 -999.990 -999.990 0.779 ..P WKT 2010 06 17 06 49 55 31.3200 -97.3300 251.000 30.0 84.838 2.840 -999.990 -999.990 0.848 ..P WKT 2010 06 17 06 54 55 31.3200 -97.3300 251.000 122.0 87.475 3.680 -999.990 -999.990 0.875 ..P WKT 2010 06 17 06 59 55 31.3200 -97.3300 251.000 457.0 75.178 2.820 -999.990 -999.990 0.752 ..P WKT 2010 06 17 07 04 55 31.3200 -97.3300 251.000 30.0 84.857 3.730 -999.990 -999.990 0.849 ..P WKT 2010 06 17 07 09 55 31.3200 -97.3300 251.000 122.0 82.423 3.180 -999.990 -999.990 0.824 ..P WKT 2010 06 17 07 14 55 31.3200 -97.3300 251.000 457.0 93.789 2.740 -999.990 -999.990 0.938 ..P WKT 2010 06 17 07 24 55 31.3200 -97.3300 251.000 30.0 89.563 2.780 -999.990 -999.990 0.896 ..P WKT 2010 06 17 07 29 55 31.3200 -97.3300 251.000 122.0 88.336 3.000 -999.990 -999.990 0.883 ..P WKT 2010 06 17 07 34 55 31.3200 -97.3300 251.000 457.0 78.664 2.920 -999.990 -999.990 0.787 ..P WKT 2010 06 17 07 39 55 31.3200 -97.3300 251.000 30.0 89.823 3.930 -999.990 -999.990 0.898 ..P WKT 2010 06 17 07 44 55 31.3200 -97.3300 251.000 122.0 96.757 3.530 -999.990 -999.990 0.968 ..P WKT 2010 06 17 07 49 55 31.3200 -97.3300 251.000 457.0 80.334 3.360 -999.990 -999.990 0.803 ..P WKT 2010 06 17 07 59 55 31.3200 -97.3300 251.000 30.0 85.700 3.840 -999.990 -999.990 0.857 ..P WKT 2010 06 17 08 04 55 31.3200 -97.3300 251.000 122.0 90.884 4.250 -999.990 -999.990 0.909 ..P WKT 2010 06 17 08 09 55 31.3200 -97.3300 251.000 457.0 82.004 3.860 -999.990 -999.990 0.820 ..P WKT 2010 06 17 08 14 55 31.3200 -97.3300 251.000 30.0 90.842 3.980 -999.990 -999.990 0.908 ..P WKT 2010 06 17 08 19 55 31.3200 -97.3300 251.000 122.0 93.492 4.220 -999.990 -999.990 0.935 ..P WKT 2010 06 17 08 24 55 31.3200 -97.3300 251.000 457.0 85.458 4.000 -999.990 -999.990 0.855 ..P WKT 2010 06 17 08 34 55 31.3200 -97.3300 251.000 30.0 93.950 4.080 -999.990 -999.990 0.940 ..P WKT 2010 06 17 08 39 55 31.3200 -97.3300 251.000 122.0 94.169 4.960 -999.990 -999.990 0.942 ..P WKT 2010 06 17 08 44 55 31.3200 -97.3300 251.000 457.0 87.224 4.450 -999.990 -999.990 0.872 ..P WKT 2010 06 17 08 49 55 31.3200 -97.3300 251.000 30.0 95.171 4.770 -999.990 -999.990 0.952 ..P WKT 2010 06 17 08 54 55 31.3200 -97.3300 251.000 122.0 91.317 3.470 -999.990 -999.990 0.913 ..P WKT 2010 06 17 08 59 55 31.3200 -97.3300 251.000 457.0 81.987 3.610 -999.990 -999.990 0.820 ..P WKT 2010 06 17 09 09 55 31.3200 -97.3300 251.000 30.0 90.552 3.500 -999.990 -999.990 0.906 ..P WKT 2010 06 17 09 14 55 31.3200 -97.3300 251.000 122.0 89.066 3.630 -999.990 -999.990 0.891 ..P WKT 2010 06 17 09 19 55 31.3200 -97.3300 251.000 457.0 81.406 3.440 -999.990 -999.990 0.814 ..P WKT 2010 06 17 09 24 55 31.3200 -97.3300 251.000 30.0 88.344 3.830 -999.990 -999.990 0.883 ..P WKT 2010 06 17 09 29 55 31.3200 -97.3300 251.000 122.0 89.666 4.040 -999.990 -999.990 0.897 ..P WKT 2010 06 17 09 34 55 31.3200 -97.3300 251.000 457.0 84.955 3.830 -999.990 -999.990 0.850 ..P WKT 2010 06 17 09 44 55 31.3200 -97.3300 251.000 30.0 85.736 3.880 -999.990 -999.990 0.857 ..P WKT 2010 06 17 09 49 55 31.3200 -97.3300 251.000 122.0 96.556 5.460 -999.990 -999.990 0.966 ..P WKT 2010 06 17 09 54 55 31.3200 -97.3300 251.000 457.0 82.691 3.460 -999.990 -999.990 0.827 ..P WKT 2010 06 17 09 59 55 31.3200 -97.3300 251.000 30.0 84.394 4.380 -999.990 -999.990 0.844 ..P WKT 2010 06 17 10 04 55 31.3200 -97.3300 251.000 122.0 90.723 3.290 -999.990 -999.990 0.907 ..P WKT 2010 06 17 10 09 55 31.3200 -97.3300 251.000 457.0 84.434 3.300 -999.990 -999.990 0.844 ..P WKT 2010 06 17 10 19 55 31.3200 -97.3300 251.000 30.0 88.277 4.890 -999.990 -999.990 0.883 ..P WKT 2010 06 17 10 24 55 31.3200 -97.3300 251.000 122.0 87.056 4.320 -999.990 -999.990 0.871 ..P WKT 2010 06 17 10 29 55 31.3200 -97.3300 251.000 457.0 77.708 3.720 -999.990 -999.990 0.777 ..P WKT 2010 06 17 10 34 55 31.3200 -97.3300 251.000 30.0 86.575 3.440 -999.990 -999.990 0.866 ..P WKT 2010 06 17 10 39 55 31.3200 -97.3300 251.000 122.0 88.996 3.320 -999.990 -999.990 0.890 ..P WKT 2010 06 17 10 44 55 31.3200 -97.3300 251.000 457.0 77.410 3.420 -999.990 -999.990 0.774 ..P WKT 2010 06 17 10 54 55 31.3200 -97.3300 251.000 30.0 88.094 4.540 -999.990 -999.990 0.881 ..P WKT 2010 06 17 10 59 55 31.3200 -97.3300 251.000 122.0 85.433 3.340 -999.990 -999.990 0.854 ..P WKT 2010 06 17 11 04 55 31.3200 -97.3300 251.000 457.0 76.894 3.530 -999.990 -999.990 0.769 ..P WKT 2010 06 17 11 09 55 31.3200 -97.3300 251.000 30.0 79.834 5.520 -999.990 -999.990 0.798 ..P WKT 2010 06 17 11 14 55 31.3200 -97.3300 251.000 122.0 81.934 4.240 -999.990 -999.990 0.819 ..P WKT 2010 06 17 11 19 55 31.3200 -97.3300 251.000 457.0 78.156 3.790 -999.990 -999.990 0.782 ..P WKT 2010 06 17 11 29 55 31.3200 -97.3300 251.000 30.0 86.042 3.280 -999.990 -999.990 0.860 ..P WKT 2010 06 17 11 34 55 31.3200 -97.3300 251.000 122.0 82.594 3.810 -999.990 -999.990 0.826 ..P WKT 2010 06 17 11 39 55 31.3200 -97.3300 251.000 457.0 79.428 4.390 -999.990 -999.990 0.794 ..P WKT 2010 06 17 11 44 55 31.3200 -97.3300 251.000 30.0 84.373 4.070 -999.990 -999.990 0.844 ..P WKT 2010 06 17 11 49 55 31.3200 -97.3300 251.000 122.0 87.918 3.920 -999.990 -999.990 0.879 ..P WKT 2010 06 17 12 09 55 31.3200 -97.3300 251.000 457.0 79.408 3.640 -999.990 -999.990 0.794 ..P WKT 2010 06 17 12 10 25 31.3200 -97.3300 251.000 457.0 76.565 3.470 -999.990 -999.990 0.766 ..P WKT 2010 06 17 12 10 55 31.3200 -97.3300 251.000 457.0 79.035 5.180 -999.990 -999.990 0.790 ..P WKT 2010 06 17 12 11 25 31.3200 -97.3300 251.000 457.0 85.420 3.460 -999.990 -999.990 0.854 ..P WKT 2010 06 17 12 11 55 31.3200 -97.3300 251.000 457.0 79.780 3.640 -999.990 -999.990 0.798 ..P WKT 2010 06 17 12 12 25 31.3200 -97.3300 251.000 457.0 82.250 3.700 -999.990 -999.990 0.823 ..P WKT 2010 06 17 12 12 55 31.3200 -97.3300 251.000 457.0 79.967 3.330 -999.990 -999.990 0.800 ..P WKT 2010 06 17 12 13 25 31.3200 -97.3300 251.000 457.0 84.114 3.900 -999.990 -999.990 0.841 ..P WKT 2010 06 17 12 13 55 31.3200 -97.3300 251.000 457.0 84.207 3.830 -999.990 -999.990 0.842 ..P WKT 2010 06 17 12 14 25 31.3200 -97.3300 251.000 457.0 83.042 3.620 -999.990 -999.990 0.830 ..P WKT 2010 06 17 12 14 55 31.3200 -97.3300 251.000 457.0 79.080 3.820 -999.990 -999.990 0.791 ..P WKT 2010 06 17 12 19 55 31.3200 -97.3300 251.000 30.0 93.854 4.400 -999.990 -999.990 0.939 ..P WKT 2010 06 17 12 24 55 31.3200 -97.3300 251.000 122.0 99.541 4.120 -999.990 -999.990 0.995 ..P WKT 2010 06 17 12 29 55 31.3200 -97.3300 251.000 457.0 85.228 4.330 -999.990 -999.990 0.852 ..P WKT 2010 06 17 12 34 55 31.3200 -97.3300 251.000 30.0 89.797 3.850 -999.990 -999.990 0.898 ..P WKT 2010 06 17 12 39 55 31.3200 -97.3300 251.000 122.0 92.268 3.790 -999.990 -999.990 0.923 ..P WKT 2010 06 17 12 44 55 31.3200 -97.3300 251.000 457.0 77.250 3.450 -999.990 -999.990 0.772 ..P WKT 2010 06 17 12 54 55 31.3200 -97.3300 251.000 30.0 93.709 3.660 -999.990 -999.990 0.937 ..P WKT 2010 06 17 12 59 55 31.3200 -97.3300 251.000 122.0 97.763 4.260 -999.990 -999.990 0.978 ..P WKT 2010 06 17 13 04 55 31.3200 -97.3300 251.000 457.0 82.081 3.880 -999.990 -999.990 0.821 ..P WKT 2010 06 17 13 09 55 31.3200 -97.3300 251.000 30.0 93.695 3.780 -999.990 -999.990 0.937 ..P WKT 2010 06 17 13 14 55 31.3200 -97.3300 251.000 122.0 95.230 3.900 -999.990 -999.990 0.952 ..P WKT 2010 06 17 13 19 55 31.3200 -97.3300 251.000 457.0 79.123 3.880 -999.990 -999.990 0.791 ..P WKT 2010 06 17 13 29 55 31.3200 -97.3300 251.000 30.0 90.435 3.740 -999.990 -999.990 0.904 ..P WKT 2010 06 17 13 34 55 31.3200 -97.3300 251.000 122.0 93.071 3.380 -999.990 -999.990 0.931 ..P WKT 2010 06 17 13 39 55 31.3200 -97.3300 251.000 457.0 84.081 3.520 -999.990 -999.990 0.841 ..P WKT 2010 06 17 13 44 55 31.3200 -97.3300 251.000 30.0 87.979 3.780 -999.990 -999.990 0.880 ..P WKT 2010 06 17 13 49 55 31.3200 -97.3300 251.000 122.0 95.239 3.120 -999.990 -999.990 0.952 ..P WKT 2010 06 17 13 54 55 31.3200 -97.3300 251.000 457.0 89.609 3.470 -999.990 -999.990 0.896 ..P WKT 2010 06 17 14 04 55 31.3200 -97.3300 251.000 30.0 93.984 2.990 -999.990 -999.990 0.940 ..P WKT 2010 06 17 14 09 55 31.3200 -97.3300 251.000 122.0 96.983 3.220 -999.990 -999.990 0.970 ..P WKT 2010 06 17 14 14 55 31.3200 -97.3300 251.000 457.0 85.123 3.250 -999.990 -999.990 0.851 ..P WKT 2010 06 17 14 19 55 31.3200 -97.3300 251.000 30.0 91.767 3.710 -999.990 -999.990 0.918 ..P WKT 2010 06 17 14 24 55 31.3200 -97.3300 251.000 122.0 93.365 4.100 -999.990 -999.990 0.934 ..P WKT 2010 06 17 14 29 55 31.3200 -97.3300 251.000 457.0 91.316 5.110 -999.990 -999.990 0.913 ..P WKT 2010 06 17 14 39 55 31.3200 -97.3300 251.000 30.0 90.164 2.980 -999.990 -999.990 0.902 ..P WKT 2010 06 17 14 44 55 31.3200 -97.3300 251.000 122.0 89.659 3.680 -999.990 -999.990 0.897 ..P WKT 2010 06 17 14 49 55 31.3200 -97.3300 251.000 457.0 85.785 4.040 -999.990 -999.990 0.858 ..P WKT 2010 06 17 14 54 55 31.3200 -97.3300 251.000 30.0 92.013 3.620 -999.990 -999.990 0.920 ..P WKT 2010 06 17 14 59 55 31.3200 -97.3300 251.000 122.0 100.488 4.760 -999.990 -999.990 1.005 ..P WKT 2010 06 17 15 04 55 31.3200 -97.3300 251.000 457.0 89.317 4.520 -999.990 -999.990 0.893 ..P WKT 2010 06 17 15 14 55 31.3200 -97.3300 251.000 30.0 87.221 3.000 -999.990 -999.990 0.872 ..P WKT 2010 06 17 15 19 55 31.3200 -97.3300 251.000 122.0 92.370 3.330 -999.990 -999.990 0.924 ..P WKT 2010 06 17 15 24 55 31.3200 -97.3300 251.000 457.0 96.397 3.540 -999.990 -999.990 0.964 ..P WKT 2010 06 17 15 29 55 31.3200 -97.3300 251.000 30.0 98.178 4.010 -999.990 -999.990 0.982 ..P WKT 2010 06 17 15 34 55 31.3200 -97.3300 251.000 122.0 87.320 3.920 -999.990 -999.990 0.873 ..P WKT 2010 06 17 15 39 55 31.3200 -97.3300 251.000 457.0 90.505 5.270 -999.990 -999.990 0.905 ..P WKT 2010 06 17 15 49 55 31.3200 -97.3300 251.000 30.0 87.223 4.280 -999.990 -999.990 0.872 ..P WKT 2010 06 17 15 54 55 31.3200 -97.3300 251.000 122.0 97.335 4.150 -999.990 -999.990 0.973 ..P WKT 2010 06 17 15 59 55 31.3200 -97.3300 251.000 457.0 84.684 4.470 -999.990 -999.990 0.847 ..P WKT 2010 06 17 16 04 55 31.3200 -97.3300 251.000 30.0 86.926 3.840 -999.990 -999.990 0.869 ..P WKT 2010 06 17 16 09 55 31.3200 -97.3300 251.000 122.0 91.137 3.460 -999.990 -999.990 0.911 ..P WKT 2010 06 17 16 14 55 31.3200 -97.3300 251.000 457.0 86.353 3.830 -999.990 -999.990 0.864 ..P WKT 2010 06 17 16 24 55 31.3200 -97.3300 251.000 30.0 87.769 3.850 -999.990 -999.990 0.878 ..P WKT 2010 06 17 16 29 55 31.3200 -97.3300 251.000 122.0 94.110 3.260 -999.990 -999.990 0.941 ..P WKT 2010 06 17 16 34 55 31.3200 -97.3300 251.000 457.0 84.845 4.180 -999.990 -999.990 0.848 ..P WKT 2010 06 17 16 39 55 31.3200 -97.3300 251.000 30.0 92.735 3.770 -999.990 -999.990 0.927 ..P WKT 2010 06 17 16 44 55 31.3200 -97.3300 251.000 122.0 97.814 3.550 -999.990 -999.990 0.978 ..P WKT 2010 06 17 16 49 55 31.3200 -97.3300 251.000 457.0 92.484 3.420 -999.990 -999.990 0.925 ..P WKT 2010 06 17 17 04 55 31.3200 -97.3300 251.000 30.0 89.504 4.310 -999.990 -999.990 0.895 ..P WKT 2010 06 17 17 09 55 31.3200 -97.3300 251.000 122.0 93.706 4.210 -999.990 -999.990 0.937 ..P WKT 2010 06 17 17 14 55 31.3200 -97.3300 251.000 457.0 87.072 3.890 -999.990 -999.990 0.871 ..P WKT 2010 06 17 17 19 55 31.3200 -97.3300 251.000 30.0 93.104 3.450 -999.990 -999.990 0.931 ..P WKT 2010 06 17 17 24 55 31.3200 -97.3300 251.000 122.0 96.040 3.790 -999.990 -999.990 0.960 ..P WKT 2010 06 17 17 29 55 31.3200 -97.3300 251.000 457.0 94.331 4.100 -999.990 -999.990 0.943 ..P WKT 2010 06 17 17 39 55 31.3200 -97.3300 251.000 30.0 99.517 3.480 -999.990 -999.990 0.995 ..P WKT 2010 06 17 17 44 55 31.3200 -97.3300 251.000 122.0 100.358 3.240 -999.990 -999.990 1.004 ..P WKT 2010 06 17 17 49 55 31.3200 -97.3300 251.000 457.0 94.015 3.360 -999.990 -999.990 0.940 ..P WKT 2010 06 17 17 54 55 31.3200 -97.3300 251.000 30.0 85.277 4.720 -999.990 -999.990 0.853 ..P WKT 2010 06 17 17 59 55 31.3200 -97.3300 251.000 122.0 93.302 2.980 -999.990 -999.990 0.933 ..P WKT 2010 06 17 18 04 55 31.3200 -97.3300 251.000 457.0 87.379 3.090 -999.990 -999.990 0.874 ..P WKT 2010 06 17 18 14 55 31.3200 -97.3300 251.000 30.0 96.851 3.660 -999.990 -999.990 0.969 ..P WKT 2010 06 17 18 19 55 31.3200 -97.3300 251.000 122.0 93.927 3.290 -999.990 -999.990 0.939 ..P WKT 2010 06 17 18 24 55 31.3200 -97.3300 251.000 457.0 89.311 2.920 -999.990 -999.990 0.893 ..P WKT 2010 06 17 18 29 55 31.3200 -97.3300 251.000 30.0 90.615 2.770 -999.990 -999.990 0.906 ..P WKT 2010 06 17 18 34 55 31.3200 -97.3300 251.000 122.0 95.585 3.270 -999.990 -999.990 0.956 ..P WKT 2010 06 17 18 39 55 31.3200 -97.3300 251.000 457.0 87.019 3.530 -999.990 -999.990 0.870 ..P WKT 2010 06 17 18 49 55 31.3200 -97.3300 251.000 30.0 92.610 3.980 -999.990 -999.990 0.926 ..P WKT 2010 06 17 18 54 55 31.3200 -97.3300 251.000 122.0 97.462 3.070 -999.990 -999.990 0.975 ..P WKT 2010 06 17 18 59 55 31.3200 -97.3300 251.000 457.0 86.514 3.200 -999.990 -999.990 0.865 ..P WKT 2010 06 17 19 04 55 31.3200 -97.3300 251.000 30.0 92.494 2.780 -999.990 -999.990 0.925 ..P WKT 2010 06 17 19 09 55 31.3200 -97.3300 251.000 122.0 97.912 3.500 -999.990 -999.990 0.979 ..P WKT 2010 06 17 19 14 55 31.3200 -97.3300 251.000 457.0 92.324 3.850 -999.990 -999.990 0.923 ..P WKT 2010 06 17 19 24 55 31.3200 -97.3300 251.000 30.0 95.782 3.600 -999.990 -999.990 0.958 ..P WKT 2010 06 17 19 29 55 31.3200 -97.3300 251.000 122.0 98.622 3.260 -999.990 -999.990 0.986 ..P WKT 2010 06 17 19 34 55 31.3200 -97.3300 251.000 457.0 85.367 2.820 -999.990 -999.990 0.854 ..P WKT 2010 06 17 19 39 55 31.3200 -97.3300 251.000 30.0 93.288 3.190 -999.990 -999.990 0.933 ..P WKT 2010 06 17 19 44 55 31.3200 -97.3300 251.000 122.0 96.128 3.350 -999.990 -999.990 0.961 ..P WKT 2010 06 17 19 49 55 31.3200 -97.3300 251.000 457.0 86.258 2.850 -999.990 -999.990 0.863 ..P WKT 2010 06 17 19 59 55 31.3200 -97.3300 251.000 30.0 86.085 3.370 -999.990 -999.990 0.861 ..P WKT 2010 06 17 20 04 55 31.3200 -97.3300 251.000 122.0 95.646 3.240 -999.990 -999.990 0.956 ..P WKT 2010 06 17 20 09 55 31.3200 -97.3300 251.000 457.0 91.363 3.220 -999.990 -999.990 0.914 ..P WKT 2010 06 17 20 14 55 31.3200 -97.3300 251.000 30.0 84.676 3.400 -999.990 -999.990 0.847 ..P WKT 2010 06 17 20 19 55 31.3200 -97.3300 251.000 122.0 86.466 3.140 -999.990 -999.990 0.865 ..P WKT 2010 06 17 20 24 55 31.3200 -97.3300 251.000 457.0 81.615 3.910 -999.990 -999.990 0.816 ..P WKT 2010 06 17 20 34 55 31.3200 -97.3300 251.000 30.0 78.917 3.220 -999.990 -999.990 0.789 ..P WKT 2010 06 17 20 39 55 31.3200 -97.3300 251.000 122.0 96.059 3.320 -999.990 -999.990 0.961 ..P WKT 2010 06 17 20 44 55 31.3200 -97.3300 251.000 457.0 88.035 3.280 -999.990 -999.990 0.880 ..P WKT 2010 06 17 20 49 55 31.3200 -97.3300 251.000 30.0 86.939 3.200 -999.990 -999.990 0.869 ..P WKT 2010 06 17 20 54 55 31.3200 -97.3300 251.000 122.0 94.894 3.750 -999.990 -999.990 0.949 ..P WKT 2010 06 17 20 59 55 31.3200 -97.3300 251.000 457.0 77.107 4.330 -999.990 -999.990 0.771 ..P WKT 2010 06 17 21 09 55 31.3200 -97.3300 251.000 30.0 81.784 4.080 -999.990 -999.990 0.818 ..P WKT 2010 06 17 21 14 55 31.3200 -97.3300 251.000 122.0 98.596 3.720 -999.990 -999.990 0.986 ..P WKT 2010 06 17 21 19 55 31.3200 -97.3300 251.000 457.0 87.816 4.170 -999.990 -999.990 0.878 ..P WKT 2010 06 17 21 24 55 31.3200 -97.3300 251.000 30.0 85.102 3.490 -999.990 -999.990 0.851 ..P WKT 2010 06 17 21 29 55 31.3200 -97.3300 251.000 122.0 95.125 3.930 -999.990 -999.990 0.951 ..P WKT 2010 06 17 21 34 55 31.3200 -97.3300 251.000 457.0 86.324 3.730 -999.990 -999.990 0.863 ..P WKT 2010 06 17 21 44 55 31.3200 -97.3300 251.000 30.0 88.254 3.220 -999.990 -999.990 0.883 ..P WKT 2010 06 17 21 49 55 31.3200 -97.3300 251.000 122.0 89.504 3.010 -999.990 -999.990 0.895 ..P WKT 2010 06 17 21 54 55 31.3200 -97.3300 251.000 457.0 86.929 3.330 -999.990 -999.990 0.869 ..P WKT 2010 06 17 21 59 55 31.3200 -97.3300 251.000 30.0 95.118 3.680 -999.990 -999.990 0.951 ..P WKT 2010 06 17 22 04 55 31.3200 -97.3300 251.000 122.0 97.502 3.450 -999.990 -999.990 0.975 ..P WKT 2010 06 17 22 09 55 31.3200 -97.3300 251.000 457.0 88.552 3.540 -999.990 -999.990 0.886 ..P WKT 2010 06 17 22 19 55 31.3200 -97.3300 251.000 30.0 96.253 3.480 -999.990 -999.990 0.963 ..P WKT 2010 06 17 22 24 55 31.3200 -97.3300 251.000 122.0 93.354 4.220 -999.990 -999.990 0.934 ..P WKT 2010 06 17 22 29 55 31.3200 -97.3300 251.000 457.0 91.304 3.980 -999.990 -999.990 0.913 ..P WKT 2010 06 17 22 34 55 31.3200 -97.3300 251.000 30.0 92.940 5.350 -999.990 -999.990 0.929 ..P WKT 2010 06 17 22 39 55 31.3200 -97.3300 251.000 122.0 97.694 4.040 -999.990 -999.990 0.977 ..P WKT 2010 06 17 22 44 55 31.3200 -97.3300 251.000 457.0 89.690 4.560 -999.990 -999.990 0.897 ..P WKT 2010 06 17 22 54 55 31.3200 -97.3300 251.000 30.0 89.558 4.170 -999.990 -999.990 0.896 ..P WKT 2010 06 17 22 59 55 31.3200 -97.3300 251.000 122.0 96.867 3.720 -999.990 -999.990 0.969 ..P WKT 2010 06 17 23 04 55 31.3200 -97.3300 251.000 457.0 90.277 4.990 -999.990 -999.990 0.903 ..P WKT 2010 06 17 23 09 55 31.3200 -97.3300 251.000 30.0 85.388 3.450 -999.990 -999.990 0.854 ..P WKT 2010 06 17 23 14 55 31.3200 -97.3300 251.000 122.0 95.537 3.700 -999.990 -999.990 0.955 ..P WKT 2010 06 17 23 19 55 31.3200 -97.3300 251.000 457.0 100.579 3.180 -999.990 -999.990 1.006 ..P WKT 2010 06 17 23 29 55 31.3200 -97.3300 251.000 30.0 100.690 2.810 -999.990 -999.990 1.007 ..P WKT 2010 06 17 23 34 55 31.3200 -97.3300 251.000 122.0 96.324 3.040 -999.990 -999.990 0.963 ..P WKT 2010 06 17 23 39 55 31.3200 -97.3300 251.000 457.0 94.229 4.450 -999.990 -999.990 0.942 ..P WKT 2010 06 17 23 44 55 31.3200 -97.3300 251.000 30.0 102.354 3.960 -999.990 -999.990 1.024 ..P WKT 2010 06 17 23 49 55 31.3200 -97.3300 251.000 122.0 100.543 3.180 -999.990 -999.990 1.005 ..P WKT 2010 06 18 00 09 55 31.3200 -97.3300 251.000 457.0 91.417 2.990 -999.990 -999.990 0.914 ..P WKT 2010 06 18 00 10 25 31.3200 -97.3300 251.000 457.0 91.141 3.830 -999.990 -999.990 0.911 ..P WKT 2010 06 18 00 10 55 31.3200 -97.3300 251.000 457.0 97.821 3.210 -999.990 -999.990 0.978 ..P WKT 2010 06 18 00 11 25 31.3200 -97.3300 251.000 457.0 95.698 3.360 -999.990 -999.990 0.957 ..P WKT 2010 06 18 00 11 55 31.3200 -97.3300 251.000 457.0 91.871 4.160 -999.990 -999.990 0.919 ..P WKT 2010 06 18 00 12 25 31.3200 -97.3300 251.000 457.0 88.897 3.390 -999.990 -999.990 0.889 ..P WKT 2010 06 18 00 12 55 31.3200 -97.3300 251.000 457.0 95.861 4.850 -999.990 -999.990 0.959 ..P WKT 2010 06 18 00 13 25 31.3200 -97.3300 251.000 457.0 96.578 4.620 -999.990 -999.990 0.966 ..P WKT 2010 06 18 00 13 55 31.3200 -97.3300 251.000 457.0 91.048 3.400 -999.990 -999.990 0.910 ..P WKT 2010 06 18 00 14 25 31.3200 -97.3300 251.000 457.0 91.765 3.790 -999.990 -999.990 0.918 ..P WKT 2010 06 18 00 14 55 31.3200 -97.3300 251.000 457.0 94.754 3.010 -999.990 -999.990 0.948 ..P WKT 2010 06 18 00 19 55 31.3200 -97.3300 251.000 30.0 95.959 4.530 -999.990 -999.990 0.960 ..P WKT 2010 06 18 00 24 55 31.3200 -97.3300 251.000 122.0 93.616 3.330 -999.990 -999.990 0.936 ..P WKT 2010 06 18 00 29 55 31.3200 -97.3300 251.000 457.0 89.570 3.530 -999.990 -999.990 0.896 ..P WKT 2010 06 18 00 34 55 31.3200 -97.3300 251.000 30.0 96.737 3.770 -999.990 -999.990 0.967 ..P WKT 2010 06 18 00 39 55 31.3200 -97.3300 251.000 122.0 97.941 3.680 -999.990 -999.990 0.979 ..P WKT 2010 06 18 00 44 55 31.3200 -97.3300 251.000 457.0 101.132 3.730 -999.990 -999.990 1.011 ..P WKT 2010 06 18 00 54 55 31.3200 -97.3300 251.000 30.0 94.449 4.460 -999.990 -999.990 0.944 ..P WKT 2010 06 18 00 59 55 31.3200 -97.3300 251.000 122.0 92.378 3.990 -999.990 -999.990 0.924 ..P WKT 2010 06 18 01 04 55 31.3200 -97.3300 251.000 457.0 87.471 3.520 -999.990 -999.990 0.875 ..P WKT 2010 06 18 01 09 55 31.3200 -97.3300 251.000 30.0 88.946 3.720 -999.990 -999.990 0.889 ..P WKT 2010 06 18 01 14 55 31.3200 -97.3300 251.000 122.0 90.563 3.240 -999.990 -999.990 0.906 ..P WKT 2010 06 18 01 19 55 31.3200 -97.3300 251.000 457.0 85.658 4.240 -999.990 -999.990 0.857 ..P WKT 2010 06 18 01 29 55 31.3200 -97.3300 251.000 30.0 97.659 3.610 -999.990 -999.990 0.977 ..P WKT 2010 06 18 01 34 55 31.3200 -97.3300 251.000 122.0 95.143 4.150 -999.990 -999.990 0.951 ..P WKT 2010 06 18 01 39 55 31.3200 -97.3300 251.000 457.0 93.054 4.320 -999.990 -999.990 0.931 ..P WKT 2010 06 18 01 44 55 31.3200 -97.3300 251.000 30.0 97.199 4.110 -999.990 -999.990 0.972 ..P WKT 2010 06 18 01 49 55 31.3200 -97.3300 251.000 122.0 96.101 3.830 -999.990 -999.990 0.961 ..P WKT 2010 06 18 01 54 55 31.3200 -97.3300 251.000 457.0 94.438 4.360 -999.990 -999.990 0.944 ..P WKT 2010 06 18 02 04 55 31.3200 -97.3300 251.000 30.0 97.990 3.990 -999.990 -999.990 0.980 ..P WKT 2010 06 18 02 09 55 31.3200 -97.3300 251.000 122.0 105.612 5.110 -999.990 -999.990 1.056 ..P WKT 2010 06 18 02 14 55 31.3200 -97.3300 251.000 457.0 88.879 4.540 -999.990 -999.990 0.889 ..P WKT 2010 06 18 02 19 55 31.3200 -97.3300 251.000 30.0 92.818 7.200 -999.990 -999.990 0.928 ..P WKT 2010 06 18 02 24 55 31.3200 -97.3300 251.000 122.0 104.402 5.670 -999.990 -999.990 1.044 ..P WKT 2010 06 18 02 29 55 31.3200 -97.3300 251.000 457.0 83.995 6.030 -999.990 -999.990 0.840 ..P WKT 2010 06 18 02 39 55 31.3200 -97.3300 251.000 30.0 95.107 6.320 -999.990 -999.990 0.951 ..P WKT 2010 06 18 02 44 55 31.3200 -97.3300 251.000 122.0 104.542 5.880 -999.990 -999.990 1.045 ..P WKT 2010 06 18 02 49 55 31.3200 -97.3300 251.000 457.0 90.490 6.620 -999.990 -999.990 0.905 ..P WKT 2010 06 18 02 54 55 31.3200 -97.3300 251.000 30.0 96.246 4.810 -999.990 -999.990 0.962 ..P WKT 2010 06 18 02 59 55 31.3200 -97.3300 251.000 122.0 91.533 4.290 -999.990 -999.990 0.915 ..P WKT 2010 06 18 03 04 55 31.3200 -97.3300 251.000 457.0 81.731 4.410 -999.990 -999.990 0.817 ..P WKT 2010 06 18 03 14 55 31.3200 -97.3300 251.000 30.0 90.451 3.550 -999.990 -999.990 0.905 ..P WKT 2010 06 18 03 19 55 31.3200 -97.3300 251.000 122.0 100.768 3.730 -999.990 -999.990 1.008 ..P WKT 2010 06 18 03 24 55 31.3200 -97.3300 251.000 457.0 87.616 3.920 -999.990 -999.990 0.876 ..P WKT 2010 06 18 03 29 55 31.3200 -97.3300 251.000 30.0 91.429 4.550 -999.990 -999.990 0.914 ..P WKT 2010 06 18 03 34 55 31.3200 -97.3300 251.000 122.0 96.089 3.990 -999.990 -999.990 0.961 ..P WKT 2010 06 18 03 39 55 31.3200 -97.3300 251.000 457.0 93.683 3.470 -999.990 -999.990 0.937 ..P WKT 2010 06 18 03 49 55 31.3200 -97.3300 251.000 30.0 95.834 3.670 -999.990 -999.990 0.958 ..P WKT 2010 06 18 03 54 55 31.3200 -97.3300 251.000 122.0 97.565 3.450 -999.990 -999.990 0.976 ..P WKT 2010 06 18 03 59 55 31.3200 -97.3300 251.000 457.0 83.617 3.630 -999.990 -999.990 0.836 ..P WKT 2010 06 18 04 04 55 31.3200 -97.3300 251.000 30.0 97.496 4.070 -999.990 -999.990 0.975 ..P WKT 2010 06 18 04 09 55 31.3200 -97.3300 251.000 122.0 98.520 4.230 -999.990 -999.990 0.985 ..P WKT 2010 06 18 04 14 55 31.3200 -97.3300 251.000 457.0 85.706 4.550 -999.990 -999.990 0.857 ..P WKT 2010 06 18 04 24 55 31.3200 -97.3300 251.000 30.0 102.257 4.490 -999.990 -999.990 1.023 ..P WKT 2010 06 18 04 29 55 31.3200 -97.3300 251.000 122.0 98.864 3.530 -999.990 -999.990 0.989 ..P WKT 2010 06 18 04 34 55 31.3200 -97.3300 251.000 457.0 87.709 5.540 -999.990 -999.990 0.877 ..P WKT 2010 06 18 04 39 55 31.3200 -97.3300 251.000 30.0 99.560 3.640 -999.990 -999.990 0.996 ..P WKT 2010 06 18 04 44 55 31.3200 -97.3300 251.000 122.0 99.132 3.790 -999.990 -999.990 0.991 ..P WKT 2010 06 18 04 49 55 31.3200 -97.3300 251.000 457.0 83.324 4.240 -999.990 -999.990 0.833 ..P WKT 2010 06 18 05 04 55 31.3200 -97.3300 251.000 30.0 97.556 3.790 -999.990 -999.990 0.976 ..P WKT 2010 06 18 05 09 55 31.3200 -97.3300 251.000 122.0 100.299 4.110 -999.990 -999.990 1.003 ..P WKT 2010 06 18 05 14 55 31.3200 -97.3300 251.000 457.0 79.634 4.090 -999.990 -999.990 0.796 ..P WKT 2010 06 18 05 19 55 31.3200 -97.3300 251.000 30.0 97.464 3.890 -999.990 -999.990 0.975 ..P WKT 2010 06 18 05 24 55 31.3200 -97.3300 251.000 122.0 104.436 4.690 -999.990 -999.990 1.044 ..P WKT 2010 06 18 05 29 55 31.3200 -97.3300 251.000 457.0 78.561 6.360 -999.990 -999.990 0.786 ..P WKT 2010 06 18 05 39 55 31.3200 -97.3300 251.000 30.0 102.825 4.280 -999.990 -999.990 1.028 ..P WKT 2010 06 18 05 44 55 31.3200 -97.3300 251.000 122.0 106.020 4.140 -999.990 -999.990 1.060 ..P WKT 2010 06 18 05 49 55 31.3200 -97.3300 251.000 457.0 76.526 4.660 -999.990 -999.990 0.765 ..P WKT 2010 06 18 05 54 55 31.3200 -97.3300 251.000 30.0 99.166 4.010 -999.990 -999.990 0.992 ..P WKT 2010 06 18 05 59 55 31.3200 -97.3300 251.000 122.0 97.149 4.150 -999.990 -999.990 0.971 ..P WKT 2010 06 18 06 04 55 31.3200 -97.3300 251.000 457.0 85.837 3.990 -999.990 -999.990 0.858 ..P WKT 2010 06 18 06 14 55 31.3200 -97.3300 251.000 30.0 98.322 4.190 -999.990 -999.990 0.983 ..P WKT 2010 06 18 06 19 55 31.3200 -97.3300 251.000 122.0 95.080 5.020 -999.990 -999.990 0.951 ..P WKT 2010 06 18 06 24 55 31.3200 -97.3300 251.000 457.0 73.534 4.210 -999.990 -999.990 0.735 ..P WKT 2010 06 18 06 29 55 31.3200 -97.3300 251.000 30.0 96.197 3.980 -999.990 -999.990 0.962 ..P WKT 2010 06 18 06 34 55 31.3200 -97.3300 251.000 122.0 93.518 4.160 -999.990 -999.990 0.935 ..P WKT 2010 06 18 06 39 55 31.3200 -97.3300 251.000 457.0 75.922 3.960 -999.990 -999.990 0.759 ..P WKT 2010 06 18 06 49 55 31.3200 -97.3300 251.000 30.0 91.436 3.950 -999.990 -999.990 0.914 ..P WKT 2010 06 18 06 54 55 31.3200 -97.3300 251.000 122.0 85.422 5.130 -999.990 -999.990 0.854 ..P WKT 2010 06 18 06 59 55 31.3200 -97.3300 251.000 457.0 71.251 4.270 -999.990 -999.990 0.713 ..P WKT 2010 06 18 07 04 55 31.3200 -97.3300 251.000 30.0 82.684 3.850 -999.990 -999.990 0.827 ..P WKT 2010 06 18 07 09 55 31.3200 -97.3300 251.000 122.0 83.143 3.810 -999.990 -999.990 0.831 ..P WKT 2010 06 18 07 14 55 31.3200 -97.3300 251.000 457.0 78.539 3.700 -999.990 -999.990 0.785 ..P WKT 2010 06 18 07 24 55 31.3200 -97.3300 251.000 30.0 85.564 4.620 -999.990 -999.990 0.856 ..P WKT 2010 06 18 07 29 55 31.3200 -97.3300 251.000 122.0 87.630 4.170 -999.990 -999.990 0.876 ..P WKT 2010 06 18 07 34 55 31.3200 -97.3300 251.000 457.0 79.011 4.130 -999.990 -999.990 0.790 ..P WKT 2010 06 18 07 39 55 31.3200 -97.3300 251.000 30.0 85.012 4.530 -999.990 -999.990 0.850 ..P WKT 2010 06 18 07 44 55 31.3200 -97.3300 251.000 122.0 93.261 4.530 -999.990 -999.990 0.933 ..P WKT 2010 06 18 07 49 55 31.3200 -97.3300 251.000 457.0 74.950 4.390 -999.990 -999.990 0.750 ..P WKT 2010 06 18 07 59 55 31.3200 -97.3300 251.000 30.0 80.425 4.580 -999.990 -999.990 0.804 ..P WKT 2010 06 18 08 04 55 31.3200 -97.3300 251.000 122.0 77.793 4.690 -999.990 -999.990 0.778 ..P WKT 2010 06 18 08 09 55 31.3200 -97.3300 251.000 457.0 84.151 4.730 -999.990 -999.990 0.842 ..P WKT 2010 06 18 08 14 55 31.3200 -97.3300 251.000 30.0 83.065 4.710 -999.990 -999.990 0.831 ..P WKT 2010 06 18 08 19 55 31.3200 -97.3300 251.000 122.0 80.574 4.410 -999.990 -999.990 0.806 ..P WKT 2010 06 18 08 24 55 31.3200 -97.3300 251.000 457.0 81.876 4.210 -999.990 -999.990 0.819 ..P WKT 2010 06 18 08 34 55 31.3200 -97.3300 251.000 30.0 89.631 4.470 -999.990 -999.990 0.896 ..P WKT 2010 06 18 08 39 55 31.3200 -97.3300 251.000 122.0 89.908 4.410 -999.990 -999.990 0.899 ..P WKT 2010 06 18 08 44 55 31.3200 -97.3300 251.000 457.0 79.940 4.790 -999.990 -999.990 0.799 ..P WKT 2010 06 18 08 49 55 31.3200 -97.3300 251.000 30.0 83.166 5.790 -999.990 -999.990 0.832 ..P WKT 2010 06 18 08 54 55 31.3200 -97.3300 251.000 122.0 91.441 5.050 -999.990 -999.990 0.914 ..P WKT 2010 06 18 08 59 55 31.3200 -97.3300 251.000 457.0 80.774 4.870 -999.990 -999.990 0.808 ..P WKT 2010 06 18 09 09 55 31.3200 -97.3300 251.000 30.0 90.248 4.840 -999.990 -999.990 0.902 ..P WKT 2010 06 18 09 14 55 31.3200 -97.3300 251.000 122.0 89.202 5.210 -999.990 -999.990 0.892 ..P WKT 2010 06 18 09 19 55 31.3200 -97.3300 251.000 457.0 82.828 5.060 -999.990 -999.990 0.828 ..P WKT 2010 06 18 09 24 55 31.3200 -97.3300 251.000 30.0 86.971 4.900 -999.990 -999.990 0.870 ..P WKT 2010 06 18 09 29 55 31.3200 -97.3300 251.000 122.0 83.543 5.070 -999.990 -999.990 0.835 ..P WKT 2010 06 18 09 34 55 31.3200 -97.3300 251.000 457.0 81.378 5.040 -999.990 -999.990 0.814 ..P WKT 2010 06 18 09 44 55 31.3200 -97.3300 251.000 30.0 81.913 4.650 -999.990 -999.990 0.819 ..P WKT 2010 06 18 09 49 55 31.3200 -97.3300 251.000 122.0 84.893 4.840 -999.990 -999.990 0.849 ..P WKT 2010 06 18 09 54 55 31.3200 -97.3300 251.000 457.0 76.943 4.440 -999.990 -999.990 0.769 ..P WKT 2010 06 18 09 59 55 31.3200 -97.3300 251.000 30.0 80.623 4.550 -999.990 -999.990 0.806 ..P WKT 2010 06 18 10 04 55 31.3200 -97.3300 251.000 122.0 85.424 6.200 -999.990 -999.990 0.854 ..P WKT 2010 06 18 10 09 55 31.3200 -97.3300 251.000 457.0 82.099 4.050 -999.990 -999.990 0.821 ..P WKT 2010 06 18 10 19 55 31.3200 -97.3300 251.000 30.0 84.154 4.800 -999.990 -999.990 0.842 ..P WKT 2010 06 18 10 24 55 31.3200 -97.3300 251.000 122.0 80.851 5.150 -999.990 -999.990 0.809 ..P WKT 2010 06 18 10 29 55 31.3200 -97.3300 251.000 457.0 78.948 4.700 -999.990 -999.990 0.789 ..P WKT 2010 06 18 10 34 55 31.3200 -97.3300 251.000 30.0 79.286 4.620 -999.990 -999.990 0.793 ..P WKT 2010 06 18 10 39 55 31.3200 -97.3300 251.000 122.0 85.222 4.860 -999.990 -999.990 0.852 ..P WKT 2010 06 18 10 44 55 31.3200 -97.3300 251.000 457.0 78.842 4.990 -999.990 -999.990 0.788 ..P WKT 2010 06 18 10 54 55 31.3200 -97.3300 251.000 30.0 74.159 4.570 -999.990 -999.990 0.742 ..P WKT 2010 06 18 10 59 55 31.3200 -97.3300 251.000 122.0 77.815 4.590 -999.990 -999.990 0.778 ..P WKT 2010 06 18 11 04 55 31.3200 -97.3300 251.000 457.0 81.190 4.850 -999.990 -999.990 0.812 ..P WKT 2010 06 18 11 09 55 31.3200 -97.3300 251.000 30.0 77.291 5.440 -999.990 -999.990 0.773 ..P WKT 2010 06 18 11 14 55 31.3200 -97.3300 251.000 122.0 81.225 4.400 -999.990 -999.990 0.812 ..P WKT 2010 06 18 11 19 55 31.3200 -97.3300 251.000 457.0 82.081 4.310 -999.990 -999.990 0.821 ..P WKT 2010 06 18 11 29 55 31.3200 -97.3300 251.000 30.0 83.893 4.360 -999.990 -999.990 0.839 ..P WKT 2010 06 18 11 34 55 31.3200 -97.3300 251.000 122.0 96.593 4.600 -999.990 -999.990 0.966 ..P WKT 2010 06 18 11 39 55 31.3200 -97.3300 251.000 457.0 79.375 4.510 -999.990 -999.990 0.794 ..P WKT 2010 06 18 11 44 55 31.3200 -97.3300 251.000 30.0 87.039 4.470 -999.990 -999.990 0.870 ..P WKT 2010 06 18 11 49 55 31.3200 -97.3300 251.000 122.0 89.812 4.590 -999.990 -999.990 0.898 ..P WKT 2010 06 18 12 09 55 31.3200 -97.3300 251.000 457.0 82.951 4.550 -999.990 -999.990 0.830 ..P WKT 2010 06 18 12 10 25 31.3200 -97.3300 251.000 457.0 81.148 4.710 -999.990 -999.990 0.811 ..P WKT 2010 06 18 12 10 55 31.3200 -97.3300 251.000 457.0 82.417 4.970 -999.990 -999.990 0.824 ..P WKT 2010 06 18 12 11 25 31.3200 -97.3300 251.000 457.0 85.083 4.550 -999.990 -999.990 0.851 ..P WKT 2010 06 18 12 11 55 31.3200 -97.3300 251.000 457.0 86.074 4.930 -999.990 -999.990 0.861 ..P WKT 2010 06 18 12 12 25 31.3200 -97.3300 251.000 457.0 89.160 4.600 -999.990 -999.990 0.892 ..P WKT 2010 06 18 12 12 55 31.3200 -97.3300 251.000 457.0 85.260 4.740 -999.990 -999.990 0.853 ..P WKT 2010 06 18 12 13 25 31.3200 -97.3300 251.000 457.0 83.457 4.910 -999.990 -999.990 0.835 ..P WKT 2010 06 18 12 13 55 31.3200 -97.3300 251.000 457.0 86.263 4.930 -999.990 -999.990 0.863 ..P WKT 2010 06 18 12 14 25 31.3200 -97.3300 251.000 457.0 81.386 4.750 -999.990 -999.990 0.814 ..P WKT 2010 06 18 12 14 55 31.3200 -97.3300 251.000 457.0 79.443 4.440 -999.990 -999.990 0.794 ..P WKT 2010 06 18 12 19 55 31.3200 -97.3300 251.000 30.0 83.618 4.700 -999.990 -999.990 0.836 ..P WKT 2010 06 18 12 24 55 31.3200 -97.3300 251.000 122.0 90.445 4.690 -999.990 -999.990 0.904 ..P WKT 2010 06 18 12 29 55 31.3200 -97.3300 251.000 457.0 89.452 4.710 -999.990 -999.990 0.895 ..P WKT 2010 06 18 12 34 55 31.3200 -97.3300 251.000 30.0 86.642 4.370 -999.990 -999.990 0.866 ..P WKT 2010 06 18 12 39 55 31.3200 -97.3300 251.000 122.0 90.536 4.670 -999.990 -999.990 0.905 ..P WKT 2010 06 18 12 44 55 31.3200 -97.3300 251.000 457.0 90.939 4.350 -999.990 -999.990 0.909 ..P WKT 2010 06 18 12 54 55 31.3200 -97.3300 251.000 30.0 81.743 4.470 -999.990 -999.990 0.817 ..P WKT 2010 06 18 12 59 55 31.3200 -97.3300 251.000 122.0 89.595 4.100 -999.990 -999.990 0.896 ..P WKT 2010 06 18 13 04 55 31.3200 -97.3300 251.000 457.0 82.930 4.160 -999.990 -999.990 0.829 ..P WKT 2010 06 18 13 09 55 31.3200 -97.3300 251.000 30.0 91.898 5.090 -999.990 -999.990 0.919 ..P WKT 2010 06 18 13 14 55 31.3200 -97.3300 251.000 122.0 93.887 3.960 -999.990 -999.990 0.939 ..P WKT 2010 06 18 13 19 55 31.3200 -97.3300 251.000 457.0 84.850 3.810 -999.990 -999.990 0.848 ..P WKT 2010 06 18 13 29 55 31.3200 -97.3300 251.000 30.0 91.100 5.160 -999.990 -999.990 0.911 ..P WKT 2010 06 18 13 34 55 31.3200 -97.3300 251.000 122.0 92.011 4.060 -999.990 -999.990 0.920 ..P WKT 2010 06 18 13 39 55 31.3200 -97.3300 251.000 457.0 83.435 4.350 -999.990 -999.990 0.834 ..P WKT 2010 06 18 13 44 55 31.3200 -97.3300 251.000 30.0 85.324 3.830 -999.990 -999.990 0.853 ..P WKT 2010 06 18 13 49 55 31.3200 -97.3300 251.000 122.0 93.909 3.900 -999.990 -999.990 0.939 ..P WKT 2010 06 18 13 54 55 31.3200 -97.3300 251.000 457.0 91.611 4.140 -999.990 -999.990 0.916 ..P WKT 2010 06 18 14 04 55 31.3200 -97.3300 251.000 30.0 86.620 3.870 -999.990 -999.990 0.866 ..P WKT 2010 06 18 14 09 55 31.3200 -97.3300 251.000 122.0 97.871 4.460 -999.990 -999.990 0.979 ..P WKT 2010 06 18 14 14 55 31.3200 -97.3300 251.000 457.0 78.999 4.190 -999.990 -999.990 0.790 ..P WKT 2010 06 18 14 19 55 31.3200 -97.3300 251.000 30.0 87.740 3.950 -999.990 -999.990 0.877 ..P WKT 2010 06 18 14 24 55 31.3200 -97.3300 251.000 122.0 85.046 3.730 -999.990 -999.990 0.850 ..P WKT 2010 06 18 14 29 55 31.3200 -97.3300 251.000 457.0 88.487 4.120 -999.990 -999.990 0.885 ..P WKT 2010 06 18 14 39 55 31.3200 -97.3300 251.000 30.0 85.171 4.170 -999.990 -999.990 0.852 ..P WKT 2010 06 18 14 44 55 31.3200 -97.3300 251.000 122.0 92.634 3.670 -999.990 -999.990 0.926 ..P WKT 2010 06 18 14 49 55 31.3200 -97.3300 251.000 457.0 89.503 4.520 -999.990 -999.990 0.895 ..P WKT 2010 06 18 14 54 55 31.3200 -97.3300 251.000 30.0 86.092 4.190 -999.990 -999.990 0.861 ..P WKT 2010 06 18 14 59 55 31.3200 -97.3300 251.000 122.0 96.620 4.090 -999.990 -999.990 0.966 ..P WKT 2010 06 18 15 04 55 31.3200 -97.3300 251.000 457.0 83.733 4.590 -999.990 -999.990 0.837 ..P WKT 2010 06 18 15 14 55 31.3200 -97.3300 251.000 30.0 88.342 4.150 -999.990 -999.990 0.883 ..P WKT 2010 06 18 15 19 55 31.3200 -97.3300 251.000 122.0 97.473 4.980 -999.990 -999.990 0.975 ..P WKT 2010 06 18 15 24 55 31.3200 -97.3300 251.000 457.0 90.442 4.550 -999.990 -999.990 0.904 ..P WKT 2010 06 18 15 29 55 31.3200 -97.3300 251.000 30.0 87.312 4.670 -999.990 -999.990 0.873 ..P WKT 2010 06 18 15 34 55 31.3200 -97.3300 251.000 122.0 93.934 4.370 -999.990 -999.990 0.939 ..P WKT 2010 06 18 15 39 55 31.3200 -97.3300 251.000 457.0 85.511 4.350 -999.990 -999.990 0.855 ..P WKT 2010 06 18 15 49 55 31.3200 -97.3300 251.000 30.0 83.850 4.640 -999.990 -999.990 0.838 ..P WKT 2010 06 18 15 54 55 31.3200 -97.3300 251.000 122.0 94.369 5.360 -999.990 -999.990 0.944 ..P WKT 2010 06 18 15 59 55 31.3200 -97.3300 251.000 457.0 86.646 5.320 -999.990 -999.990 0.866 ..P WKT 2010 06 18 16 04 55 31.3200 -97.3300 251.000 30.0 84.771 4.540 -999.990 -999.990 0.848 ..P WKT 2010 06 18 16 09 55 31.3200 -97.3300 251.000 122.0 91.111 5.590 -999.990 -999.990 0.911 ..P WKT 2010 06 18 16 14 55 31.3200 -97.3300 251.000 457.0 84.920 5.040 -999.990 -999.990 0.849 ..P WKT 2010 06 18 16 24 55 31.3200 -97.3300 251.000 30.0 85.289 4.990 -999.990 -999.990 0.853 ..P WKT 2010 06 18 16 29 55 31.3200 -97.3300 251.000 122.0 92.542 4.930 -999.990 -999.990 0.925 ..P WKT 2010 06 18 16 34 55 31.3200 -97.3300 251.000 457.0 89.356 4.300 -999.990 -999.990 0.894 ..P WKT 2010 06 18 16 39 55 31.3200 -97.3300 251.000 30.0 89.092 4.390 -999.990 -999.990 0.891 ..P WKT 2010 06 18 16 44 55 31.3200 -97.3300 251.000 122.0 94.952 4.070 -999.990 -999.990 0.950 ..P WKT 2010 06 18 16 49 55 31.3200 -97.3300 251.000 457.0 87.174 3.720 -999.990 -999.990 0.872 ..P WKT 2010 06 18 17 04 55 31.3200 -97.3300 251.000 30.0 85.062 5.010 -999.990 -999.990 0.851 ..P WKT 2010 06 18 17 09 55 31.3200 -97.3300 251.000 122.0 91.720 4.380 -999.990 -999.990 0.917 ..P WKT 2010 06 18 17 14 55 31.3200 -97.3300 251.000 457.0 94.761 4.220 -999.990 -999.990 0.948 ..P WKT 2010 06 18 17 19 55 31.3200 -97.3300 251.000 30.0 88.481 4.350 -999.990 -999.990 0.885 ..P WKT 2010 06 18 17 24 55 31.3200 -97.3300 251.000 122.0 92.912 4.360 -999.990 -999.990 0.929 ..P WKT 2010 06 18 17 29 55 31.3200 -97.3300 251.000 457.0 90.667 4.570 -999.990 -999.990 0.907 ..P WKT 2010 06 18 17 39 55 31.3200 -97.3300 251.000 30.0 96.084 4.320 -999.990 -999.990 0.961 ..P WKT 2010 06 18 17 44 55 31.3200 -97.3300 251.000 122.0 105.694 4.480 -999.990 -999.990 1.057 ..P WKT 2010 06 18 17 49 55 31.3200 -97.3300 251.000 457.0 94.445 4.450 -999.990 -999.990 0.944 ..P WKT 2010 06 18 17 54 55 31.3200 -97.3300 251.000 30.0 93.486 4.680 -999.990 -999.990 0.935 ..P WKT 2010 06 18 17 59 55 31.3200 -97.3300 251.000 122.0 96.698 5.230 -999.990 -999.990 0.967 ..P WKT 2010 06 18 18 04 55 31.3200 -97.3300 251.000 457.0 93.515 5.060 -999.990 -999.990 0.935 ..P WKT 2010 06 18 18 14 55 31.3200 -97.3300 251.000 30.0 93.525 4.820 -999.990 -999.990 0.935 ..P WKT 2010 06 18 18 19 55 31.3200 -97.3300 251.000 122.0 99.495 6.620 -999.990 -999.990 0.995 ..P WKT 2010 06 18 18 24 55 31.3200 -97.3300 251.000 457.0 94.069 4.930 -999.990 -999.990 0.941 ..P WKT 2010 06 18 18 29 55 31.3200 -97.3300 251.000 30.0 95.593 4.900 -999.990 -999.990 0.956 ..P WKT 2010 06 18 18 34 55 31.3200 -97.3300 251.000 122.0 104.063 5.160 -999.990 -999.990 1.041 ..P WKT 2010 06 18 18 39 55 31.3200 -97.3300 251.000 457.0 97.527 5.140 -999.990 -999.990 0.975 ..P WKT 2010 06 18 18 49 55 31.3200 -97.3300 251.000 30.0 95.055 4.520 -999.990 -999.990 0.951 ..P WKT 2010 06 18 18 54 55 31.3200 -97.3300 251.000 122.0 99.674 4.310 -999.990 -999.990 0.997 ..P WKT 2010 06 18 18 59 55 31.3200 -97.3300 251.000 457.0 92.624 3.770 -999.990 -999.990 0.926 ..P WKT 2010 06 18 19 04 55 31.3200 -97.3300 251.000 30.0 94.187 4.220 -999.990 -999.990 0.942 ..P WKT 2010 06 18 19 09 55 31.3200 -97.3300 251.000 122.0 100.471 3.120 -999.990 -999.990 1.005 ..P WKT 2010 06 18 19 14 55 31.3200 -97.3300 251.000 457.0 88.701 3.030 -999.990 -999.990 0.887 ..P WKT 2010 06 18 19 24 55 31.3200 -97.3300 251.000 30.0 89.186 3.120 -999.990 -999.990 0.892 ..P WKT 2010 06 18 19 29 55 31.3200 -97.3300 251.000 122.0 102.550 3.650 -999.990 -999.990 1.026 ..P WKT 2010 06 18 19 34 55 31.3200 -97.3300 251.000 457.0 91.755 3.910 -999.990 -999.990 0.918 ..P WKT 2010 06 18 19 39 55 31.3200 -97.3300 251.000 30.0 95.954 2.600 -999.990 -999.990 0.960 ..P WKT 2010 06 18 19 44 55 31.3200 -97.3300 251.000 122.0 92.379 2.970 -999.990 -999.990 0.924 ..P WKT 2010 06 18 19 49 55 31.3200 -97.3300 251.000 457.0 89.916 2.820 -999.990 -999.990 0.899 ..P WKT 2010 06 18 19 59 55 31.3200 -97.3300 251.000 30.0 87.883 2.680 -999.990 -999.990 0.879 ..P WKT 2010 06 18 20 04 55 31.3200 -97.3300 251.000 122.0 92.755 3.500 -999.990 -999.990 0.928 ..P WKT 2010 06 18 20 09 55 31.3200 -97.3300 251.000 457.0 88.746 3.070 -999.990 -999.990 0.887 ..P WKT 2010 06 18 20 14 55 31.3200 -97.3300 251.000 30.0 88.206 2.840 -999.990 -999.990 0.882 ..P WKT 2010 06 18 20 19 55 31.3200 -97.3300 251.000 122.0 96.962 2.680 -999.990 -999.990 0.970 ..P WKT 2010 06 18 20 24 55 31.3200 -97.3300 251.000 457.0 90.039 2.910 -999.990 -999.990 0.900 ..P WKT 2010 06 18 20 34 55 31.3200 -97.3300 251.000 30.0 89.276 3.430 -999.990 -999.990 0.893 ..P WKT 2010 06 18 20 39 55 31.3200 -97.3300 251.000 122.0 97.237 3.020 -999.990 -999.990 0.972 ..P WKT 2010 06 18 20 44 55 31.3200 -97.3300 251.000 457.0 85.363 3.940 -999.990 -999.990 0.854 ..P WKT 2010 06 18 20 49 55 31.3200 -97.3300 251.000 30.0 94.016 4.330 -999.990 -999.990 0.940 ..P WKT 2010 06 18 20 54 55 31.3200 -97.3300 251.000 122.0 91.990 3.990 -999.990 -999.990 0.920 ..P WKT 2010 06 18 20 59 55 31.3200 -97.3300 251.000 457.0 88.301 2.730 -999.990 -999.990 0.883 ..P WKT 2010 06 18 21 09 55 31.3200 -97.3300 251.000 30.0 84.944 2.810 -999.990 -999.990 0.849 ..P WKT 2010 06 18 21 14 55 31.3200 -97.3300 251.000 122.0 89.574 4.110 -999.990 -999.990 0.896 ..P WKT 2010 06 18 21 19 55 31.3200 -97.3300 251.000 457.0 86.302 4.580 -999.990 -999.990 0.863 ..P WKT 2010 06 18 21 24 55 31.3200 -97.3300 251.000 30.0 85.248 3.650 -999.990 -999.990 0.852 ..P WKT 2010 06 18 21 29 55 31.3200 -97.3300 251.000 122.0 96.391 2.880 -999.990 -999.990 0.964 ..P WKT 2010 06 18 21 34 55 31.3200 -97.3300 251.000 457.0 84.249 3.540 -999.990 -999.990 0.842 ..P WKT 2010 06 18 21 44 55 31.3200 -97.3300 251.000 30.0 97.345 3.060 -999.990 -999.990 0.973 ..P WKT 2010 06 18 21 49 55 31.3200 -97.3300 251.000 122.0 92.925 3.110 -999.990 -999.990 0.929 ..P WKT 2010 06 18 21 54 55 31.3200 -97.3300 251.000 457.0 93.771 2.760 -999.990 -999.990 0.938 ..P WKT 2010 06 18 21 59 55 31.3200 -97.3300 251.000 30.0 91.015 2.420 -999.990 -999.990 0.910 ..P WKT 2010 06 18 22 04 55 31.3200 -97.3300 251.000 122.0 94.077 4.290 -999.990 -999.990 0.941 ..P WKT 2010 06 18 22 09 55 31.3200 -97.3300 251.000 457.0 90.214 3.630 -999.990 -999.990 0.902 ..P WKT 2010 06 18 22 19 55 31.3200 -97.3300 251.000 30.0 87.156 3.070 -999.990 -999.990 0.872 ..P WKT 2010 06 18 22 24 55 31.3200 -97.3300 251.000 122.0 98.211 3.410 -999.990 -999.990 0.982 ..P WKT 2010 06 18 22 29 55 31.3200 -97.3300 251.000 457.0 89.877 4.530 -999.990 -999.990 0.899 ..P WKT 2010 06 18 22 34 55 31.3200 -97.3300 251.000 30.0 94.837 4.030 -999.990 -999.990 0.948 ..P WKT 2010 06 18 22 39 55 31.3200 -97.3300 251.000 122.0 110.597 2.810 -999.990 -999.990 1.106 ..P WKT 2010 06 18 22 44 55 31.3200 -97.3300 251.000 457.0 103.649 3.240 -999.990 -999.990 1.036 ..P WKT 2010 06 18 22 54 55 31.3200 -97.3300 251.000 30.0 95.449 2.490 -999.990 -999.990 0.954 ..P WKT 2010 06 18 22 59 55 31.3200 -97.3300 251.000 122.0 103.334 3.490 -999.990 -999.990 1.033 ..P WKT 2010 06 18 23 04 55 31.3200 -97.3300 251.000 457.0 95.716 4.090 -999.990 -999.990 0.957 ..P WKT 2010 06 18 23 09 55 31.3200 -97.3300 251.000 30.0 93.634 3.240 -999.990 -999.990 0.936 ..P WKT 2010 06 18 23 14 55 31.3200 -97.3300 251.000 122.0 104.009 2.650 -999.990 -999.990 1.040 ..P WKT 2010 06 18 23 19 55 31.3200 -97.3300 251.000 457.0 92.517 1.880 -999.990 -999.990 0.925 ..P WKT 2010 06 18 23 29 55 31.3200 -97.3300 251.000 30.0 95.277 4.770 -999.990 -999.990 0.953 ..P WKT 2010 06 18 23 34 55 31.3200 -97.3300 251.000 122.0 100.116 1.930 -999.990 -999.990 1.001 ..P WKT 2010 06 18 23 39 55 31.3200 -97.3300 251.000 457.0 93.750 3.150 -999.990 -999.990 0.938 ..P WKT 2010 06 18 23 44 55 31.3200 -97.3300 251.000 30.0 91.534 3.030 -999.990 -999.990 0.915 ..P WKT 2010 06 18 23 49 55 31.3200 -97.3300 251.000 122.0 98.309 2.370 -999.990 -999.990 0.983 ..P WKT 2010 06 19 00 09 55 31.3200 -97.3300 251.000 457.0 93.027 2.440 -999.990 -999.990 0.930 ..P WKT 2010 06 19 00 10 25 31.3200 -97.3300 251.000 457.0 97.553 2.460 -999.990 -999.990 0.976 ..P WKT 2010 06 19 00 10 55 31.3200 -97.3300 251.000 457.0 95.992 2.130 -999.990 -999.990 0.960 ..P WKT 2010 06 19 00 11 25 31.3200 -97.3300 251.000 457.0 96.367 2.020 -999.990 -999.990 0.964 ..P WKT 2010 06 19 00 11 55 31.3200 -97.3300 251.000 457.0 96.327 2.020 -999.990 -999.990 0.963 ..P WKT 2010 06 19 00 12 25 31.3200 -97.3300 251.000 457.0 92.413 3.530 -999.990 -999.990 0.924 ..P WKT 2010 06 19 00 12 55 31.3200 -97.3300 251.000 457.0 92.651 2.560 -999.990 -999.990 0.927 ..P WKT 2010 06 19 00 13 25 31.3200 -97.3300 251.000 457.0 95.239 2.250 -999.990 -999.990 0.952 ..P WKT 2010 06 19 00 13 55 31.3200 -97.3300 251.000 457.0 96.168 3.330 -999.990 -999.990 0.962 ..P WKT 2010 06 19 00 14 25 31.3200 -97.3300 251.000 457.0 96.820 2.220 -999.990 -999.990 0.968 ..P WKT 2010 06 19 00 14 55 31.3200 -97.3300 251.000 457.0 96.781 2.120 -999.990 -999.990 0.968 ..P WKT 2010 06 19 00 19 55 31.3200 -97.3300 251.000 30.0 95.276 2.400 -999.990 -999.990 0.953 ..P WKT 2010 06 19 00 24 55 31.3200 -97.3300 251.000 122.0 97.785 2.600 -999.990 -999.990 0.978 ..P WKT 2010 06 19 00 29 55 31.3200 -97.3300 251.000 457.0 93.235 2.820 -999.990 -999.990 0.932 ..P WKT 2010 06 19 00 34 55 31.3200 -97.3300 251.000 30.0 95.190 2.760 -999.990 -999.990 0.952 ..P WKT 2010 06 19 00 39 55 31.3200 -97.3300 251.000 122.0 103.655 4.360 -999.990 -999.990 1.037 ..P WKT 2010 06 19 00 44 55 31.3200 -97.3300 251.000 457.0 94.672 3.050 -999.990 -999.990 0.947 ..P WKT 2010 06 19 00 54 55 31.3200 -97.3300 251.000 30.0 95.206 3.240 -999.990 -999.990 0.952 ..P WKT 2010 06 19 00 59 55 31.3200 -97.3300 251.000 122.0 97.940 4.310 -999.990 -999.990 0.979 ..P WKT 2010 06 19 01 04 55 31.3200 -97.3300 251.000 457.0 98.319 3.760 -999.990 -999.990 0.983 ..P WKT 2010 06 19 01 09 55 31.3200 -97.3300 251.000 30.0 92.322 4.490 -999.990 -999.990 0.923 ..P WKT 2010 06 19 01 14 55 31.3200 -97.3300 251.000 122.0 101.710 3.740 -999.990 -999.990 1.017 ..P WKT 2010 06 19 01 19 55 31.3200 -97.3300 251.000 457.0 94.742 3.360 -999.990 -999.990 0.947 ..P WKT 2010 06 19 01 29 55 31.3200 -97.3300 251.000 30.0 106.337 3.310 -999.990 -999.990 1.063 ..P WKT 2010 06 19 01 34 55 31.3200 -97.3300 251.000 122.0 110.204 3.970 -999.990 -999.990 1.102 ..P WKT 2010 06 19 01 39 55 31.3200 -97.3300 251.000 457.0 103.391 2.770 -999.990 -999.990 1.034 ..P WKT 2010 06 19 01 44 55 31.3200 -97.3300 251.000 30.0 105.873 4.200 -999.990 -999.990 1.059 ..P WKT 2010 06 19 01 49 55 31.3200 -97.3300 251.000 122.0 105.301 2.940 -999.990 -999.990 1.053 ..P WKT 2010 06 19 01 54 55 31.3200 -97.3300 251.000 457.0 93.627 2.450 -999.990 -999.990 0.936 ..P WKT 2010 06 19 02 04 55 31.3200 -97.3300 251.000 30.0 108.922 2.780 -999.990 -999.990 1.089 ..P WKT 2010 06 19 02 09 55 31.3200 -97.3300 251.000 122.0 102.023 3.180 -999.990 -999.990 1.020 ..P WKT 2010 06 19 02 14 55 31.3200 -97.3300 251.000 457.0 92.345 4.870 -999.990 -999.990 0.923 ..P WKT 2010 06 19 02 19 55 31.3200 -97.3300 251.000 30.0 105.721 4.290 -999.990 -999.990 1.057 ..P WKT 2010 06 19 02 24 55 31.3200 -97.3300 251.000 122.0 99.374 3.680 -999.990 -999.990 0.994 ..P WKT 2010 06 19 02 29 55 31.3200 -97.3300 251.000 457.0 97.750 5.270 -999.990 -999.990 0.978 ..P WKT 2010 06 19 02 39 55 31.3200 -97.3300 251.000 30.0 100.534 4.690 -999.990 -999.990 1.005 ..P WKT 2010 06 19 02 44 55 31.3200 -97.3300 251.000 122.0 98.830 4.060 -999.990 -999.990 0.988 ..P WKT 2010 06 19 02 49 55 31.3200 -97.3300 251.000 457.0 87.949 3.850 -999.990 -999.990 0.879 ..P WKT 2010 06 19 02 54 55 31.3200 -97.3300 251.000 30.0 99.034 4.870 -999.990 -999.990 0.990 ..P WKT 2010 06 19 02 59 55 31.3200 -97.3300 251.000 122.0 95.659 5.270 -999.990 -999.990 0.957 ..P WKT 2010 06 19 03 04 55 31.3200 -97.3300 251.000 457.0 85.051 4.160 -999.990 -999.990 0.851 ..P WKT 2010 06 19 03 14 55 31.3200 -97.3300 251.000 30.0 92.089 3.610 -999.990 -999.990 0.921 ..P WKT 2010 06 19 03 19 55 31.3200 -97.3300 251.000 122.0 91.096 4.790 -999.990 -999.990 0.911 ..P WKT 2010 06 19 03 24 55 31.3200 -97.3300 251.000 457.0 89.547 3.960 -999.990 -999.990 0.895 ..P WKT 2010 06 19 03 29 55 31.3200 -97.3300 251.000 30.0 102.196 4.790 -999.990 -999.990 1.022 ..P WKT 2010 06 19 03 34 55 31.3200 -97.3300 251.000 122.0 88.397 4.610 -999.990 -999.990 0.884 ..P WKT 2010 06 19 03 39 55 31.3200 -97.3300 251.000 457.0 89.909 2.560 -999.990 -999.990 0.899 ..P WKT 2010 06 19 03 49 55 31.3200 -97.3300 251.000 30.0 90.509 3.450 -999.990 -999.990 0.905 ..P WKT 2010 06 19 03 54 55 31.3200 -97.3300 251.000 122.0 88.620 3.230 -999.990 -999.990 0.886 ..P WKT 2010 06 19 03 59 55 31.3200 -97.3300 251.000 457.0 84.501 4.350 -999.990 -999.990 0.845 ..P WKT 2010 06 19 04 04 55 31.3200 -97.3300 251.000 30.0 96.266 4.440 -999.990 -999.990 0.963 ..P WKT 2010 06 19 04 09 55 31.3200 -97.3300 251.000 122.0 95.632 4.530 -999.990 -999.990 0.956 ..P WKT 2010 06 19 04 14 55 31.3200 -97.3300 251.000 457.0 89.143 2.900 -999.990 -999.990 0.891 ..P WKT 2010 06 19 04 24 55 31.3200 -97.3300 251.000 30.0 95.599 3.130 -999.990 -999.990 0.956 ..P WKT 2010 06 19 04 29 55 31.3200 -97.3300 251.000 122.0 98.231 3.860 -999.990 -999.990 0.982 ..P WKT 2010 06 19 04 34 55 31.3200 -97.3300 251.000 457.0 91.519 5.210 -999.990 -999.990 0.915 ..P WKT 2010 06 19 04 39 55 31.3200 -97.3300 251.000 30.0 93.872 3.640 -999.990 -999.990 0.939 ..P WKT 2010 06 19 04 44 55 31.3200 -97.3300 251.000 122.0 95.528 4.830 -999.990 -999.990 0.955 ..P WKT 2010 06 19 04 49 55 31.3200 -97.3300 251.000 457.0 87.976 3.230 -999.990 -999.990 0.880 ..P WKT 2010 06 19 05 04 55 31.3200 -97.3300 251.000 30.0 86.808 3.900 -999.990 -999.990 0.868 ..P WKT 2010 06 19 05 09 55 31.3200 -97.3300 251.000 122.0 87.350 4.630 -999.990 -999.990 0.873 ..P WKT 2010 06 19 05 14 55 31.3200 -97.3300 251.000 457.0 78.257 4.100 -999.990 -999.990 0.783 ..P WKT 2010 06 19 05 19 55 31.3200 -97.3300 251.000 30.0 90.669 4.070 -999.990 -999.990 0.907 ..P WKT 2010 06 19 05 24 55 31.3200 -97.3300 251.000 122.0 91.492 4.700 -999.990 -999.990 0.915 ..P WKT 2010 06 19 05 29 55 31.3200 -97.3300 251.000 457.0 90.079 4.410 -999.990 -999.990 0.901 ..P WKT 2010 06 19 05 39 55 31.3200 -97.3300 251.000 30.0 88.986 3.560 -999.990 -999.990 0.890 ..P WKT 2010 06 19 05 44 55 31.3200 -97.3300 251.000 122.0 93.221 3.650 -999.990 -999.990 0.932 ..P WKT 2010 06 19 05 49 55 31.3200 -97.3300 251.000 457.0 80.401 5.010 -999.990 -999.990 0.804 ..P WKT 2010 06 19 05 54 55 31.3200 -97.3300 251.000 30.0 95.821 6.760 -999.990 -999.990 0.958 ..P WKT 2010 06 19 05 59 55 31.3200 -97.3300 251.000 122.0 98.939 5.790 -999.990 -999.990 0.989 ..P WKT 2010 06 19 06 04 55 31.3200 -97.3300 251.000 457.0 97.304 4.480 -999.990 -999.990 0.973 ..P WKT 2010 06 19 06 14 55 31.3200 -97.3300 251.000 30.0 90.035 3.660 -999.990 -999.990 0.900 ..P WKT 2010 06 19 06 19 55 31.3200 -97.3300 251.000 122.0 95.592 5.640 -999.990 -999.990 0.956 ..P WKT 2010 06 19 06 24 55 31.3200 -97.3300 251.000 457.0 88.279 7.240 -999.990 -999.990 0.883 ..P WKT 2010 06 19 06 29 55 31.3200 -97.3300 251.000 30.0 95.517 5.350 -999.990 -999.990 0.955 ..P WKT 2010 06 19 06 34 55 31.3200 -97.3300 251.000 122.0 91.561 4.510 -999.990 -999.990 0.916 ..P WKT 2010 06 19 06 39 55 31.3200 -97.3300 251.000 457.0 78.362 4.300 -999.990 -999.990 0.784 ..P WKT 2010 06 19 06 49 55 31.3200 -97.3300 251.000 30.0 78.161 4.740 -999.990 -999.990 0.782 ..P WKT 2010 06 19 06 54 55 31.3200 -97.3300 251.000 122.0 87.806 4.740 -999.990 -999.990 0.878 ..P WKT 2010 06 19 06 59 55 31.3200 -97.3300 251.000 457.0 68.034 4.150 -999.990 -999.990 0.680 ..P WKT 2010 06 19 07 04 55 31.3200 -97.3300 251.000 30.0 82.444 3.760 -999.990 -999.990 0.824 ..P WKT 2010 06 19 07 09 55 31.3200 -97.3300 251.000 122.0 83.966 3.510 -999.990 -999.990 0.840 ..P WKT 2010 06 19 07 14 55 31.3200 -97.3300 251.000 457.0 73.715 3.450 -999.990 -999.990 0.737 ..P WKT 2010 06 19 07 24 55 31.3200 -97.3300 251.000 30.0 86.971 4.210 -999.990 -999.990 0.870 ..P WKT 2010 06 19 07 29 55 31.3200 -97.3300 251.000 122.0 89.175 3.870 -999.990 -999.990 0.892 ..P WKT 2010 06 19 07 34 55 31.3200 -97.3300 251.000 457.0 73.991 3.730 -999.990 -999.990 0.740 ..P WKT 2010 06 19 07 39 55 31.3200 -97.3300 251.000 30.0 89.239 3.420 -999.990 -999.990 0.892 ..P WKT 2010 06 19 07 44 55 31.3200 -97.3300 251.000 122.0 91.164 3.320 -999.990 -999.990 0.912 ..P WKT 2010 06 19 07 49 55 31.3200 -97.3300 251.000 457.0 77.376 3.930 -999.990 -999.990 0.774 ..P WKT 2010 06 19 07 59 55 31.3200 -97.3300 251.000 30.0 79.540 4.490 -999.990 -999.990 0.795 ..P WKT 2010 06 19 08 04 55 31.3200 -97.3300 251.000 122.0 87.642 4.930 -999.990 -999.990 0.876 ..P WKT 2010 06 19 08 09 55 31.3200 -97.3300 251.000 457.0 80.303 3.520 -999.990 -999.990 0.803 ..P WKT 2010 06 19 08 14 55 31.3200 -97.3300 251.000 30.0 82.228 5.690 -999.990 -999.990 0.822 ..P WKT 2010 06 19 08 19 55 31.3200 -97.3300 251.000 122.0 91.597 2.970 -999.990 -999.990 0.916 ..P WKT 2010 06 19 08 24 55 31.3200 -97.3300 251.000 457.0 79.480 2.860 -999.990 -999.990 0.795 ..P WKT 2010 06 19 08 34 55 31.3200 -97.3300 251.000 30.0 90.659 3.400 -999.990 -999.990 0.907 ..P WKT 2010 06 19 08 39 55 31.3200 -97.3300 251.000 122.0 94.575 3.520 -999.990 -999.990 0.946 ..P WKT 2010 06 19 08 44 55 31.3200 -97.3300 251.000 457.0 87.531 3.890 -999.990 -999.990 0.875 ..P WKT 2010 06 19 08 49 55 31.3200 -97.3300 251.000 30.0 93.415 4.860 -999.990 -999.990 0.934 ..P WKT 2010 06 19 08 54 55 31.3200 -97.3300 251.000 122.0 89.882 3.970 -999.990 -999.990 0.899 ..P WKT 2010 06 19 08 59 55 31.3200 -97.3300 251.000 457.0 82.974 4.690 -999.990 -999.990 0.830 ..P WKT 2010 06 19 09 09 55 31.3200 -97.3300 251.000 30.0 85.246 4.890 -999.990 -999.990 0.852 ..P WKT 2010 06 19 09 14 55 31.3200 -97.3300 251.000 122.0 85.287 4.220 -999.990 -999.990 0.853 ..P WKT 2010 06 19 09 19 55 31.3200 -97.3300 251.000 457.0 89.408 4.800 -999.990 -999.990 0.894 ..P WKT 2010 06 19 09 24 55 31.3200 -97.3300 251.000 30.0 83.540 3.690 -999.990 -999.990 0.835 ..P WKT 2010 06 19 09 29 55 31.3200 -97.3300 251.000 122.0 83.580 4.330 -999.990 -999.990 0.836 ..P WKT 2010 06 19 09 34 55 31.3200 -97.3300 251.000 457.0 83.902 3.350 -999.990 -999.990 0.839 ..P WKT 2010 06 19 09 44 55 31.3200 -97.3300 251.000 30.0 83.381 3.500 -999.990 -999.990 0.834 ..P WKT 2010 06 19 09 49 55 31.3200 -97.3300 251.000 122.0 80.002 3.280 -999.990 -999.990 0.800 ..P WKT 2010 06 19 09 54 55 31.3200 -97.3300 251.000 457.0 86.480 3.250 -999.990 -999.990 0.865 ..P WKT 2010 06 19 09 59 55 31.3200 -97.3300 251.000 30.0 77.467 3.570 -999.990 -999.990 0.775 ..P WKT 2010 06 19 10 04 55 31.3200 -97.3300 251.000 122.0 84.228 4.600 -999.990 -999.990 0.842 ..P WKT 2010 06 19 10 09 55 31.3200 -97.3300 251.000 457.0 80.847 3.280 -999.990 -999.990 0.808 ..P WKT 2010 06 19 10 19 55 31.3200 -97.3300 251.000 30.0 76.982 3.530 -999.990 -999.990 0.770 ..P WKT 2010 06 19 10 24 55 31.3200 -97.3300 251.000 122.0 83.265 3.600 -999.990 -999.990 0.833 ..P WKT 2010 06 19 10 29 55 31.3200 -97.3300 251.000 457.0 90.958 3.980 -999.990 -999.990 0.910 ..P WKT 2010 06 19 10 34 55 31.3200 -97.3300 251.000 30.0 80.042 3.620 -999.990 -999.990 0.800 ..P WKT 2010 06 19 10 39 55 31.3200 -97.3300 251.000 122.0 87.456 3.780 -999.990 -999.990 0.875 ..P WKT 2010 06 19 10 44 55 31.3200 -97.3300 251.000 457.0 85.846 4.760 -999.990 -999.990 0.858 ..P WKT 2010 06 19 10 54 55 31.3200 -97.3300 251.000 30.0 81.353 4.730 -999.990 -999.990 0.814 ..P WKT 2010 06 19 10 59 55 31.3200 -97.3300 251.000 122.0 88.348 5.280 -999.990 -999.990 0.883 ..P WKT 2010 06 19 11 04 55 31.3200 -97.3300 251.000 457.0 86.878 3.930 -999.990 -999.990 0.869 ..P WKT 2010 06 19 11 09 55 31.3200 -97.3300 251.000 30.0 83.713 4.500 -999.990 -999.990 0.837 ..P WKT 2010 06 19 11 14 55 31.3200 -97.3300 251.000 122.0 98.054 3.880 -999.990 -999.990 0.981 ..P WKT 2010 06 19 11 19 55 31.3200 -97.3300 251.000 457.0 89.241 3.630 -999.990 -999.990 0.892 ..P WKT 2010 06 19 11 29 55 31.3200 -97.3300 251.000 30.0 88.248 5.090 -999.990 -999.990 0.882 ..P WKT 2010 06 19 11 34 55 31.3200 -97.3300 251.000 122.0 91.552 5.390 -999.990 -999.990 0.916 ..P WKT 2010 06 19 11 39 55 31.3200 -97.3300 251.000 457.0 80.444 3.870 -999.990 -999.990 0.804 ..P WKT 2010 06 19 11 44 55 31.3200 -97.3300 251.000 30.0 89.541 4.230 -999.990 -999.990 0.895 ..P WKT 2010 06 19 11 49 55 31.3200 -97.3300 251.000 122.0 93.412 3.730 -999.990 -999.990 0.934 ..P WKT 2010 06 19 12 09 55 31.3200 -97.3300 251.000 457.0 76.323 3.850 -999.990 -999.990 0.763 ..P WKT 2010 06 19 12 10 25 31.3200 -97.3300 251.000 457.0 80.677 3.790 -999.990 -999.990 0.807 ..P WKT 2010 06 19 12 10 55 31.3200 -97.3300 251.000 457.0 80.087 4.300 -999.990 -999.990 0.801 ..P WKT 2010 06 19 12 11 25 31.3200 -97.3300 251.000 457.0 76.104 3.260 -999.990 -999.990 0.761 ..P WKT 2010 06 19 12 11 55 31.3200 -97.3300 251.000 457.0 81.307 4.370 -999.990 -999.990 0.813 ..P WKT 2010 06 19 12 12 25 31.3200 -97.3300 251.000 457.0 79.585 3.910 -999.990 -999.990 0.796 ..P WKT 2010 06 19 12 12 55 31.3200 -97.3300 251.000 457.0 77.581 4.090 -999.990 -999.990 0.776 ..P WKT 2010 06 19 12 13 25 31.3200 -97.3300 251.000 457.0 81.935 4.470 -999.990 -999.990 0.819 ..P WKT 2010 06 19 12 13 55 31.3200 -97.3300 251.000 457.0 80.920 3.830 -999.990 -999.990 0.809 ..P WKT 2010 06 19 12 14 25 31.3200 -97.3300 251.000 457.0 80.754 3.500 -999.990 -999.990 0.808 ..P WKT 2010 06 19 12 14 55 31.3200 -97.3300 251.000 457.0 77.619 3.510 -999.990 -999.990 0.776 ..P WKT 2010 06 19 12 19 55 31.3200 -97.3300 251.000 30.0 81.175 3.380 -999.990 -999.990 0.812 ..P WKT 2010 06 19 12 24 55 31.3200 -97.3300 251.000 122.0 95.321 3.960 -999.990 -999.990 0.953 ..P WKT 2010 06 19 12 29 55 31.3200 -97.3300 251.000 457.0 77.412 5.000 -999.990 -999.990 0.774 ..P WKT 2010 06 19 12 34 55 31.3200 -97.3300 251.000 30.0 91.269 4.460 -999.990 -999.990 0.913 ..P WKT 2010 06 19 12 39 55 31.3200 -97.3300 251.000 122.0 88.610 3.780 -999.990 -999.990 0.886 ..P WKT 2010 06 19 12 44 55 31.3200 -97.3300 251.000 457.0 83.976 3.920 -999.990 -999.990 0.840 ..P WKT 2010 06 19 12 54 55 31.3200 -97.3300 251.000 30.0 84.923 4.280 -999.990 -999.990 0.849 ..P WKT 2010 06 19 12 59 55 31.3200 -97.3300 251.000 122.0 92.332 4.400 -999.990 -999.990 0.923 ..P WKT 2010 06 19 13 04 55 31.3200 -97.3300 251.000 457.0 75.068 5.180 -999.990 -999.990 0.751 ..P WKT 2010 06 19 13 09 55 31.3200 -97.3300 251.000 30.0 85.295 4.860 -999.990 -999.990 0.853 ..P WKT 2010 06 19 13 14 55 31.3200 -97.3300 251.000 122.0 84.667 3.850 -999.990 -999.990 0.847 ..P WKT 2010 06 19 13 19 55 31.3200 -97.3300 251.000 457.0 77.137 5.020 -999.990 -999.990 0.771 ..P WKT 2010 06 19 13 29 55 31.3200 -97.3300 251.000 30.0 86.708 3.880 -999.990 -999.990 0.867 ..P WKT 2010 06 19 13 34 55 31.3200 -97.3300 251.000 122.0 91.551 4.510 -999.990 -999.990 0.916 ..P WKT 2010 06 19 13 39 55 31.3200 -97.3300 251.000 457.0 85.695 4.520 -999.990 -999.990 0.857 ..P WKT 2010 06 19 13 44 55 31.3200 -97.3300 251.000 30.0 89.128 5.510 -999.990 -999.990 0.891 ..P WKT 2010 06 19 13 49 55 31.3200 -97.3300 251.000 122.0 93.123 5.620 -999.990 -999.990 0.931 ..P WKT 2010 06 19 13 54 55 31.3200 -97.3300 251.000 457.0 91.490 3.800 -999.990 -999.990 0.915 ..P WKT 2010 06 19 14 04 55 31.3200 -97.3300 251.000 30.0 94.653 3.870 -999.990 -999.990 0.947 ..P WKT 2010 06 19 14 09 55 31.3200 -97.3300 251.000 122.0 91.575 4.870 -999.990 -999.990 0.916 ..P WKT 2010 06 19 14 14 55 31.3200 -97.3300 251.000 457.0 85.969 5.390 -999.990 -999.990 0.860 ..P WKT 2010 06 19 14 19 55 31.3200 -97.3300 251.000 30.0 84.299 5.530 -999.990 -999.990 0.843 ..P WKT 2010 06 19 14 24 55 31.3200 -97.3300 251.000 122.0 93.025 4.740 -999.990 -999.990 0.930 ..P WKT 2010 06 19 14 29 55 31.3200 -97.3300 251.000 457.0 82.647 3.950 -999.990 -999.990 0.826 ..P WKT 2010 06 19 14 39 55 31.3200 -97.3300 251.000 30.0 87.333 3.980 -999.990 -999.990 0.873 ..P WKT 2010 06 19 14 44 55 31.3200 -97.3300 251.000 122.0 92.281 4.670 -999.990 -999.990 0.923 ..P WKT 2010 06 19 14 49 55 31.3200 -97.3300 251.000 457.0 93.017 5.460 -999.990 -999.990 0.930 ..P WKT 2010 06 19 14 54 55 31.3200 -97.3300 251.000 30.0 84.214 6.010 -999.990 -999.990 0.842 ..P WKT 2010 06 19 14 59 55 31.3200 -97.3300 251.000 122.0 94.489 5.480 -999.990 -999.990 0.945 ..P WKT 2010 06 19 15 04 55 31.3200 -97.3300 251.000 457.0 86.812 4.340 -999.990 -999.990 0.868 ..P WKT 2010 06 19 15 14 55 31.3200 -97.3300 251.000 30.0 90.968 4.310 -999.990 -999.990 0.910 ..P WKT 2010 06 19 15 19 55 31.3200 -97.3300 251.000 122.0 91.864 5.400 -999.990 -999.990 0.919 ..P WKT 2010 06 19 15 24 55 31.3200 -97.3300 251.000 457.0 90.938 5.980 -999.990 -999.990 0.909 ..P WKT 2010 06 19 15 29 55 31.3200 -97.3300 251.000 30.0 91.133 5.520 -999.990 -999.990 0.911 ..P WKT 2010 06 19 15 34 55 31.3200 -97.3300 251.000 122.0 91.749 4.950 -999.990 -999.990 0.917 ..P WKT 2010 06 19 15 39 55 31.3200 -97.3300 251.000 457.0 82.563 3.930 -999.990 -999.990 0.826 ..P WKT 2010 06 19 15 49 55 31.3200 -97.3300 251.000 30.0 92.533 3.970 -999.990 -999.990 0.925 ..P WKT 2010 06 19 15 54 55 31.3200 -97.3300 251.000 122.0 94.327 5.000 -999.990 -999.990 0.943 ..P WKT 2010 06 19 15 59 55 31.3200 -97.3300 251.000 457.0 93.042 5.730 -999.990 -999.990 0.930 ..P WKT 2010 06 19 16 04 55 31.3200 -97.3300 251.000 30.0 93.436 4.220 -999.990 -999.990 0.934 ..P WKT 2010 06 19 16 09 55 31.3200 -97.3300 251.000 122.0 97.325 3.570 -999.990 -999.990 0.973 ..P WKT 2010 06 19 16 14 55 31.3200 -97.3300 251.000 457.0 87.794 3.460 -999.990 -999.990 0.878 ..P WKT 2010 06 19 16 24 55 31.3200 -97.3300 251.000 30.0 95.031 3.830 -999.990 -999.990 0.950 ..P WKT 2010 06 19 16 29 55 31.3200 -97.3300 251.000 122.0 106.200 4.610 -999.990 -999.990 1.062 ..P WKT 2010 06 19 16 34 55 31.3200 -97.3300 251.000 457.0 93.204 3.670 -999.990 -999.990 0.932 ..P WKT 2010 06 19 16 39 55 31.3200 -97.3300 251.000 30.0 91.523 4.250 -999.990 -999.990 0.915 ..P WKT 2010 06 19 16 44 55 31.3200 -97.3300 251.000 122.0 107.571 5.110 -999.990 -999.990 1.076 ..P WKT 2010 06 19 16 49 55 31.3200 -97.3300 251.000 457.0 100.026 5.110 -999.990 -999.990 1.000 ..P WKT 2010 06 19 17 04 55 31.3200 -97.3300 251.000 30.0 93.968 5.870 -999.990 -999.990 0.940 ..P WKT 2010 06 19 17 09 55 31.3200 -97.3300 251.000 122.0 104.819 4.260 -999.990 -999.990 1.048 ..P WKT 2010 06 19 17 14 55 31.3200 -97.3300 251.000 457.0 99.075 5.220 -999.990 -999.990 0.991 ..P WKT 2010 06 19 17 19 55 31.3200 -97.3300 251.000 30.0 96.539 3.880 -999.990 -999.990 0.965 ..P WKT 2010 06 19 17 24 55 31.3200 -97.3300 251.000 122.0 105.571 4.020 -999.990 -999.990 1.056 ..P WKT 2010 06 19 17 29 55 31.3200 -97.3300 251.000 457.0 93.283 3.770 -999.990 -999.990 0.933 ..P WKT 2010 06 19 17 39 55 31.3200 -97.3300 251.000 30.0 102.781 3.940 -999.990 -999.990 1.028 ..P WKT 2010 06 19 17 44 55 31.3200 -97.3300 251.000 122.0 101.162 3.340 -999.990 -999.990 1.012 ..P WKT 2010 06 19 17 49 55 31.3200 -97.3300 251.000 457.0 100.102 3.740 -999.990 -999.990 1.001 ..P WKT 2010 06 19 17 54 55 31.3200 -97.3300 251.000 30.0 93.196 3.930 -999.990 -999.990 0.932 ..P WKT 2010 06 19 17 59 55 31.3200 -97.3300 251.000 122.0 104.381 3.640 -999.990 -999.990 1.044 ..P WKT 2010 06 19 18 04 55 31.3200 -97.3300 251.000 457.0 96.643 3.640 -999.990 -999.990 0.966 ..P WKT 2010 06 19 18 14 55 31.3200 -97.3300 251.000 30.0 95.558 3.440 -999.990 -999.990 0.956 ..P WKT 2010 06 19 18 19 55 31.3200 -97.3300 251.000 122.0 102.761 3.670 -999.990 -999.990 1.028 ..P WKT 2010 06 19 18 24 55 31.3200 -97.3300 251.000 457.0 88.835 4.580 -999.990 -999.990 0.888 ..P WKT 2010 06 19 18 29 55 31.3200 -97.3300 251.000 30.0 90.200 5.510 -999.990 -999.990 0.902 ..P WKT 2010 06 19 18 34 55 31.3200 -97.3300 251.000 122.0 93.788 5.380 -999.990 -999.990 0.938 ..P WKT 2010 06 19 18 39 55 31.3200 -97.3300 251.000 457.0 89.041 4.200 -999.990 -999.990 0.890 ..P WKT 2010 06 19 18 49 55 31.3200 -97.3300 251.000 30.0 89.210 4.100 -999.990 -999.990 0.892 ..P WKT 2010 06 19 18 54 55 31.3200 -97.3300 251.000 122.0 87.460 4.830 -999.990 -999.990 0.875 ..P WKT 2010 06 19 18 59 55 31.3200 -97.3300 251.000 457.0 82.104 5.330 -999.990 -999.990 0.821 ..P WKT 2010 06 19 19 04 55 31.3200 -97.3300 251.000 30.0 87.571 5.330 -999.990 -999.990 0.876 ..P WKT 2010 06 19 19 09 55 31.3200 -97.3300 251.000 122.0 98.029 4.700 -999.990 -999.990 0.980 ..P WKT 2010 06 19 19 14 55 31.3200 -97.3300 251.000 457.0 88.513 3.990 -999.990 -999.990 0.885 ..P WKT 2010 06 19 19 24 55 31.3200 -97.3300 251.000 30.0 92.247 4.010 -999.990 -999.990 0.922 ..P WKT 2010 06 19 19 29 55 31.3200 -97.3300 251.000 122.0 94.816 5.280 -999.990 -999.990 0.948 ..P WKT 2010 06 19 19 34 55 31.3200 -97.3300 251.000 457.0 84.497 5.650 -999.990 -999.990 0.845 ..P WKT 2010 06 19 19 39 55 31.3200 -97.3300 251.000 30.0 86.928 5.630 -999.990 -999.990 0.869 ..P WKT 2010 06 19 19 44 55 31.3200 -97.3300 251.000 122.0 93.928 4.730 -999.990 -999.990 0.939 ..P WKT 2010 06 19 19 49 55 31.3200 -97.3300 251.000 457.0 80.709 4.630 -999.990 -999.990 0.807 ..P WKT 2010 06 19 19 59 55 31.3200 -97.3300 251.000 30.0 85.864 5.450 -999.990 -999.990 0.859 ..P WKT 2010 06 19 20 04 55 31.3200 -97.3300 251.000 122.0 95.230 5.190 -999.990 -999.990 0.952 ..P WKT 2010 06 19 20 09 55 31.3200 -97.3300 251.000 457.0 86.193 5.440 -999.990 -999.990 0.862 ..P WKT 2010 06 19 20 14 55 31.3200 -97.3300 251.000 30.0 87.117 4.960 -999.990 -999.990 0.871 ..P WKT 2010 06 19 20 19 55 31.3200 -97.3300 251.000 122.0 94.126 5.550 -999.990 -999.990 0.941 ..P WKT 2010 06 19 20 24 55 31.3200 -97.3300 251.000 457.0 86.201 4.950 -999.990 -999.990 0.862 ..P WKT 2010 06 19 20 34 55 31.3200 -97.3300 251.000 30.0 93.399 4.170 -999.990 -999.990 0.934 ..P WKT 2010 06 19 20 39 55 31.3200 -97.3300 251.000 122.0 95.801 4.980 -999.990 -999.990 0.958 ..P WKT 2010 06 19 20 44 55 31.3200 -97.3300 251.000 457.0 81.213 5.710 -999.990 -999.990 0.812 ..P WKT 2010 06 19 20 49 55 31.3200 -97.3300 251.000 30.0 84.583 5.100 -999.990 -999.990 0.846 ..P WKT 2010 06 19 20 54 55 31.3200 -97.3300 251.000 122.0 96.099 4.510 -999.990 -999.990 0.961 ..P WKT 2010 06 19 20 59 55 31.3200 -97.3300 251.000 457.0 80.554 4.150 -999.990 -999.990 0.806 ..P WKT 2010 06 19 21 09 55 31.3200 -97.3300 251.000 30.0 86.068 3.830 -999.990 -999.990 0.861 ..P WKT 2010 06 19 21 14 55 31.3200 -97.3300 251.000 122.0 82.142 4.420 -999.990 -999.990 0.821 ..P WKT 2010 06 19 21 19 55 31.3200 -97.3300 251.000 457.0 78.494 5.110 -999.990 -999.990 0.785 ..P WKT 2010 06 19 21 24 55 31.3200 -97.3300 251.000 30.0 82.707 4.310 -999.990 -999.990 0.827 ..P WKT 2010 06 19 21 29 55 31.3200 -97.3300 251.000 122.0 91.606 4.500 -999.990 -999.990 0.916 ..P WKT 2010 06 19 21 34 55 31.3200 -97.3300 251.000 457.0 82.859 3.690 -999.990 -999.990 0.829 ..P WKT 2010 06 19 21 44 55 31.3200 -97.3300 251.000 30.0 84.171 3.730 -999.990 -999.990 0.842 ..P WKT 2010 06 19 21 49 55 31.3200 -97.3300 251.000 122.0 92.295 4.460 -999.990 -999.990 0.923 ..P WKT 2010 06 19 21 54 55 31.3200 -97.3300 251.000 457.0 85.817 4.410 -999.990 -999.990 0.858 ..P WKT 2010 06 19 21 59 55 31.3200 -97.3300 251.000 30.0 91.183 5.120 -999.990 -999.990 0.912 ..P WKT 2010 06 19 22 04 55 31.3200 -97.3300 251.000 122.0 97.923 4.570 -999.990 -999.990 0.979 ..P WKT 2010 06 19 22 09 55 31.3200 -97.3300 251.000 457.0 95.301 4.200 -999.990 -999.990 0.953 ..P WKT 2010 06 19 22 19 55 31.3200 -97.3300 251.000 30.0 92.421 4.050 -999.990 -999.990 0.924 ..P WKT 2010 06 19 22 24 55 31.3200 -97.3300 251.000 122.0 96.286 4.860 -999.990 -999.990 0.963 ..P WKT 2010 06 19 22 29 55 31.3200 -97.3300 251.000 457.0 86.675 5.130 -999.990 -999.990 0.867 ..P WKT 2010 06 19 22 34 55 31.3200 -97.3300 251.000 30.0 88.890 5.320 -999.990 -999.990 0.889 ..P WKT 2010 06 19 22 39 55 31.3200 -97.3300 251.000 122.0 96.327 5.190 -999.990 -999.990 0.963 ..P WKT 2010 06 19 22 44 55 31.3200 -97.3300 251.000 457.0 86.447 4.550 -999.990 -999.990 0.864 ..P WKT 2010 06 19 22 54 55 31.3200 -97.3300 251.000 30.0 87.479 4.210 -999.990 -999.990 0.875 ..P WKT 2010 06 19 22 59 55 31.3200 -97.3300 251.000 122.0 101.403 4.810 -999.990 -999.990 1.014 ..P WKT 2010 06 19 23 04 55 31.3200 -97.3300 251.000 457.0 93.904 5.440 -999.990 -999.990 0.939 ..P WKT 2010 06 19 23 09 55 31.3200 -97.3300 251.000 30.0 94.918 5.800 -999.990 -999.990 0.949 ..P WKT 2010 06 19 23 14 55 31.3200 -97.3300 251.000 122.0 98.127 5.510 -999.990 -999.990 0.981 ..P WKT 2010 06 19 23 19 55 31.3200 -97.3300 251.000 457.0 93.652 4.610 -999.990 -999.990 0.937 ..P WKT 2010 06 19 23 29 55 31.3200 -97.3300 251.000 30.0 94.675 4.410 -999.990 -999.990 0.947 ..P WKT 2010 06 19 23 34 55 31.3200 -97.3300 251.000 122.0 99.346 5.940 -999.990 -999.990 0.993 ..P WKT 2010 06 19 23 39 55 31.3200 -97.3300 251.000 457.0 93.048 5.970 -999.990 -999.990 0.930 ..P WKT 2010 06 19 23 44 55 31.3200 -97.3300 251.000 30.0 98.951 6.200 -999.990 -999.990 0.990 ..P WKT 2010 06 19 23 49 55 31.3200 -97.3300 251.000 122.0 100.191 4.460 -999.990 -999.990 1.002 ..P WKT 2010 06 20 00 09 55 31.3200 -97.3300 251.000 457.0 94.195 5.190 -999.990 -999.990 0.942 ..P WKT 2010 06 20 00 10 25 31.3200 -97.3300 251.000 457.0 95.849 3.830 -999.990 -999.990 0.958 ..P WKT 2010 06 20 00 10 55 31.3200 -97.3300 251.000 457.0 94.902 4.320 -999.990 -999.990 0.949 ..P WKT 2010 06 20 00 11 25 31.3200 -97.3300 251.000 457.0 99.294 3.900 -999.990 -999.990 0.993 ..P WKT 2010 06 20 00 11 55 31.3200 -97.3300 251.000 457.0 91.499 5.940 -999.990 -999.990 0.915 ..P WKT 2010 06 20 00 12 25 31.3200 -97.3300 251.000 457.0 87.127 5.110 -999.990 -999.990 0.871 ..P WKT 2010 06 20 00 12 55 31.3200 -97.3300 251.000 457.0 94.396 4.050 -999.990 -999.990 0.944 ..P WKT 2010 06 20 00 13 25 31.3200 -97.3300 251.000 457.0 95.776 3.910 -999.990 -999.990 0.958 ..P WKT 2010 06 20 00 13 55 31.3200 -97.3300 251.000 457.0 96.471 3.820 -999.990 -999.990 0.965 ..P WKT 2010 06 20 00 14 25 31.3200 -97.3300 251.000 457.0 95.112 4.070 -999.990 -999.990 0.951 ..P WKT 2010 06 20 00 14 55 31.3200 -97.3300 251.000 457.0 92.384 3.960 -999.990 -999.990 0.924 ..P WKT 2010 06 20 00 19 55 31.3200 -97.3300 251.000 30.0 97.693 4.120 -999.990 -999.990 0.977 ..P WKT 2010 06 20 00 24 55 31.3200 -97.3300 251.000 122.0 100.263 4.750 -999.990 -999.990 1.003 ..P WKT 2010 06 20 00 29 55 31.3200 -97.3300 251.000 457.0 94.755 4.370 -999.990 -999.990 0.948 ..P WKT 2010 06 20 00 34 55 31.3200 -97.3300 251.000 30.0 95.682 4.480 -999.990 -999.990 0.957 ..P WKT 2010 06 20 00 39 55 31.3200 -97.3300 251.000 122.0 106.057 3.870 -999.990 -999.990 1.061 ..P WKT 2010 06 20 00 44 55 31.3200 -97.3300 251.000 457.0 98.084 5.140 -999.990 -999.990 0.981 ..P WKT 2010 06 20 00 54 55 31.3200 -97.3300 251.000 30.0 106.598 4.390 -999.990 -999.990 1.066 ..P WKT 2010 06 20 00 59 55 31.3200 -97.3300 251.000 122.0 105.698 3.970 -999.990 -999.990 1.057 ..P WKT 2010 06 20 01 04 55 31.3200 -97.3300 251.000 457.0 103.291 4.450 -999.990 -999.990 1.033 ..P WKT 2010 06 20 01 09 55 31.3200 -97.3300 251.000 30.0 104.991 4.340 -999.990 -999.990 1.050 ..P WKT 2010 06 20 01 14 55 31.3200 -97.3300 251.000 122.0 97.792 5.860 -999.990 -999.990 0.978 ..P WKT 2010 06 20 01 19 55 31.3200 -97.3300 251.000 457.0 98.535 4.520 -999.990 -999.990 0.985 ..P WKT 2010 06 20 01 29 55 31.3200 -97.3300 251.000 30.0 97.633 4.580 -999.990 -999.990 0.976 ..P WKT 2010 06 20 01 34 55 31.3200 -97.3300 251.000 122.0 105.571 4.440 -999.990 -999.990 1.056 ..P WKT 2010 06 20 01 39 55 31.3200 -97.3300 251.000 457.0 97.631 4.230 -999.990 -999.990 0.976 ..P WKT 2010 06 20 01 44 55 31.3200 -97.3300 251.000 30.0 101.736 4.970 -999.990 -999.990 1.017 ..P WKT 2010 06 20 01 49 55 31.3200 -97.3300 251.000 122.0 104.198 4.080 -999.990 -999.990 1.042 ..P WKT 2010 06 20 01 54 55 31.3200 -97.3300 251.000 457.0 96.806 3.650 -999.990 -999.990 0.968 ..P WKT 2010 06 20 02 04 55 31.3200 -97.3300 251.000 30.0 105.407 4.750 -999.990 -999.990 1.054 ..P WKT 2010 06 20 02 09 55 31.3200 -97.3300 251.000 122.0 110.450 3.900 -999.990 -999.990 1.105 ..P WKT 2010 06 20 02 14 55 31.3200 -97.3300 251.000 457.0 94.964 4.500 -999.990 -999.990 0.950 ..P WKT 2010 06 20 02 19 55 31.3200 -97.3300 251.000 30.0 96.449 4.110 -999.990 -999.990 0.964 ..P WKT 2010 06 20 02 24 55 31.3200 -97.3300 251.000 122.0 100.397 4.060 -999.990 -999.990 1.004 ..P WKT 2010 06 20 02 29 55 31.3200 -97.3300 251.000 457.0 92.302 4.410 -999.990 -999.990 0.923 ..P WKT 2010 06 20 02 39 55 31.3200 -97.3300 251.000 30.0 92.887 4.240 -999.990 -999.990 0.929 ..P WKT 2010 06 20 02 44 55 31.3200 -97.3300 251.000 122.0 94.724 4.380 -999.990 -999.990 0.947 ..P WKT 2010 06 20 02 49 55 31.3200 -97.3300 251.000 457.0 89.993 4.510 -999.990 -999.990 0.900 ..P WKT 2010 06 20 02 54 55 31.3200 -97.3300 251.000 30.0 98.943 5.000 -999.990 -999.990 0.989 ..P WKT 2010 06 20 02 59 55 31.3200 -97.3300 251.000 122.0 99.959 5.000 -999.990 -999.990 1.000 ..P WKT 2010 06 20 03 04 55 31.3200 -97.3300 251.000 457.0 87.293 5.420 -999.990 -999.990 0.873 ..P WKT 2010 06 20 03 14 55 31.3200 -97.3300 251.000 30.0 95.832 5.500 -999.990 -999.990 0.958 ..P WKT 2010 06 20 03 19 55 31.3200 -97.3300 251.000 122.0 95.831 5.040 -999.990 -999.990 0.958 ..P WKT 2010 06 20 03 24 55 31.3200 -97.3300 251.000 457.0 84.339 5.090 -999.990 -999.990 0.843 ..P WKT 2010 06 20 03 29 55 31.3200 -97.3300 251.000 30.0 96.513 4.970 -999.990 -999.990 0.965 ..P WKT 2010 06 20 03 34 55 31.3200 -97.3300 251.000 122.0 94.871 5.180 -999.990 -999.990 0.949 ..P WKT 2010 06 20 03 39 55 31.3200 -97.3300 251.000 457.0 86.663 5.360 -999.990 -999.990 0.867 ..P WKT 2010 06 20 03 49 55 31.3200 -97.3300 251.000 30.0 93.343 4.930 -999.990 -999.990 0.933 ..P WKT 2010 06 20 03 54 55 31.3200 -97.3300 251.000 122.0 88.399 4.670 -999.990 -999.990 0.884 ..P WKT 2010 06 20 03 59 55 31.3200 -97.3300 251.000 457.0 83.865 4.840 -999.990 -999.990 0.839 ..P WKT 2010 06 20 04 04 55 31.3200 -97.3300 251.000 30.0 91.640 4.360 -999.990 -999.990 0.916 ..P WKT 2010 06 20 04 09 55 31.3200 -97.3300 251.000 122.0 78.765 4.610 -999.990 -999.990 0.788 ..P WKT 2010 06 20 04 14 55 31.3200 -97.3300 251.000 457.0 87.360 4.090 -999.990 -999.990 0.874 ..P WKT 2010 06 20 04 24 55 31.3200 -97.3300 251.000 30.0 95.974 5.720 -999.990 -999.990 0.960 ..P WKT 2010 06 20 04 29 55 31.3200 -97.3300 251.000 122.0 85.600 4.710 -999.990 -999.990 0.856 ..P WKT 2010 06 20 04 34 55 31.3200 -97.3300 251.000 457.0 91.635 4.940 -999.990 -999.990 0.916 ..P WKT 2010 06 20 04 39 55 31.3200 -97.3300 251.000 30.0 94.252 4.910 -999.990 -999.990 0.943 ..P WKT 2010 06 20 04 44 55 31.3200 -97.3300 251.000 122.0 98.920 5.650 -999.990 -999.990 0.989 ..P WKT 2010 06 20 04 49 55 31.3200 -97.3300 251.000 457.0 86.358 6.890 -999.990 -999.990 0.864 ..P WKT 2010 06 20 05 04 55 31.3200 -97.3300 251.000 30.0 92.460 4.900 -999.990 -999.990 0.925 ..P WKT 2010 06 20 05 09 55 31.3200 -97.3300 251.000 122.0 92.493 4.660 -999.990 -999.990 0.925 ..P WKT 2010 06 20 05 14 55 31.3200 -97.3300 251.000 457.0 87.331 4.860 -999.990 -999.990 0.873 ..P WKT 2010 06 20 05 19 55 31.3200 -97.3300 251.000 30.0 98.575 4.570 -999.990 -999.990 0.986 ..P WKT 2010 06 20 05 24 55 31.3200 -97.3300 251.000 122.0 99.975 3.780 -999.990 -999.990 1.000 ..P WKT 2010 06 20 05 29 55 31.3200 -97.3300 251.000 457.0 83.057 3.480 -999.990 -999.990 0.831 ..P WKT 2010 06 20 05 39 55 31.3200 -97.3300 251.000 30.0 97.423 5.830 -999.990 -999.990 0.974 ..P WKT 2010 06 20 05 44 55 31.3200 -97.3300 251.000 122.0 99.726 3.620 -999.990 -999.990 0.997 ..P WKT 2010 06 20 05 49 55 31.3200 -97.3300 251.000 457.0 93.008 4.260 -999.990 -999.990 0.930 ..P WKT 2010 06 20 05 54 55 31.3200 -97.3300 251.000 30.0 97.225 4.610 -999.990 -999.990 0.972 ..P WKT 2010 06 20 05 59 55 31.3200 -97.3300 251.000 122.0 101.988 4.410 -999.990 -999.990 1.020 ..P WKT 2010 06 20 06 04 55 31.3200 -97.3300 251.000 457.0 88.983 3.660 -999.990 -999.990 0.890 ..P WKT 2010 06 20 06 14 55 31.3200 -97.3300 251.000 30.0 94.643 3.670 -999.990 -999.990 0.946 ..P WKT 2010 06 20 06 19 55 31.3200 -97.3300 251.000 122.0 98.547 4.290 -999.990 -999.990 0.985 ..P WKT 2010 06 20 06 24 55 31.3200 -97.3300 251.000 457.0 79.219 4.220 -999.990 -999.990 0.792 ..P WKT 2010 06 20 06 29 55 31.3200 -97.3300 251.000 30.0 101.981 3.980 -999.990 -999.990 1.020 ..P WKT 2010 06 20 06 34 55 31.3200 -97.3300 251.000 122.0 96.046 4.340 -999.990 -999.990 0.960 ..P WKT 2010 06 20 06 39 55 31.3200 -97.3300 251.000 457.0 80.271 4.120 -999.990 -999.990 0.803 ..P WKT 2010 06 20 06 49 55 31.3200 -97.3300 251.000 30.0 98.911 4.790 -999.990 -999.990 0.989 ..P WKT 2010 06 20 06 54 55 31.3200 -97.3300 251.000 122.0 92.059 3.840 -999.990 -999.990 0.921 ..P WKT 2010 06 20 06 59 55 31.3200 -97.3300 251.000 457.0 73.185 3.860 -999.990 -999.990 0.732 ..P WKT 2010 06 20 07 04 55 31.3200 -97.3300 251.000 30.0 90.379 3.630 -999.990 -999.990 0.904 ..P WKT 2010 06 20 07 09 55 31.3200 -97.3300 251.000 122.0 82.571 3.890 -999.990 -999.990 0.826 ..P WKT 2010 06 20 07 14 55 31.3200 -97.3300 251.000 457.0 75.037 4.170 -999.990 -999.990 0.750 ..P WKT 2010 06 20 07 24 55 31.3200 -97.3300 251.000 30.0 84.872 3.980 -999.990 -999.990 0.849 ..P WKT 2010 06 20 07 29 55 31.3200 -97.3300 251.000 122.0 91.995 3.890 -999.990 -999.990 0.920 ..P WKT 2010 06 20 07 34 55 31.3200 -97.3300 251.000 457.0 76.577 3.840 -999.990 -999.990 0.766 ..P WKT 2010 06 20 07 39 55 31.3200 -97.3300 251.000 30.0 87.114 5.160 -999.990 -999.990 0.871 ..P WKT 2010 06 20 07 44 55 31.3200 -97.3300 251.000 122.0 85.494 3.830 -999.990 -999.990 0.855 ..P WKT 2010 06 20 07 49 55 31.3200 -97.3300 251.000 457.0 74.586 4.030 -999.990 -999.990 0.746 ..P WKT 2010 06 20 07 59 55 31.3200 -97.3300 251.000 30.0 79.111 4.010 -999.990 -999.990 0.791 ..P WKT 2010 06 20 08 04 55 31.3200 -97.3300 251.000 122.0 81.978 3.980 -999.990 -999.990 0.820 ..P WKT 2010 06 20 08 09 55 31.3200 -97.3300 251.000 457.0 72.964 3.360 -999.990 -999.990 0.730 ..P WKT 2010 06 20 08 14 55 31.3200 -97.3300 251.000 30.0 84.846 3.790 -999.990 -999.990 0.848 ..P WKT 2010 06 20 08 19 55 31.3200 -97.3300 251.000 122.0 84.162 3.700 -999.990 -999.990 0.842 ..P WKT 2010 06 20 08 24 55 31.3200 -97.3300 251.000 457.0 78.289 4.910 -999.990 -999.990 0.783 ..P WKT 2010 06 20 08 34 55 31.3200 -97.3300 251.000 30.0 87.261 4.580 -999.990 -999.990 0.873 ..P WKT 2010 06 20 08 39 55 31.3200 -97.3300 251.000 122.0 89.133 3.680 -999.990 -999.990 0.891 ..P WKT 2010 06 20 08 44 55 31.3200 -97.3300 251.000 457.0 74.074 3.450 -999.990 -999.990 0.741 ..P WKT 2010 06 20 08 49 55 31.3200 -97.3300 251.000 30.0 88.098 4.160 -999.990 -999.990 0.881 ..P WKT 2010 06 20 08 54 55 31.3200 -97.3300 251.000 122.0 92.837 3.870 -999.990 -999.990 0.928 ..P WKT 2010 06 20 08 59 55 31.3200 -97.3300 251.000 457.0 76.003 3.810 -999.990 -999.990 0.760 ..P WKT 2010 06 20 09 09 55 31.3200 -97.3300 251.000 30.0 82.868 3.660 -999.990 -999.990 0.829 ..P WKT 2010 06 20 09 14 55 31.3200 -97.3300 251.000 122.0 102.604 3.520 -999.990 -999.990 1.026 ..P WKT 2010 06 20 09 19 55 31.3200 -97.3300 251.000 457.0 78.654 4.030 -999.990 -999.990 0.787 ..P WKT 2010 06 20 09 24 55 31.3200 -97.3300 251.000 30.0 95.386 4.270 -999.990 -999.990 0.954 ..P WKT 2010 06 20 09 29 55 31.3200 -97.3300 251.000 122.0 111.025 4.220 -999.990 -999.990 1.110 ..P WKT 2010 06 20 09 34 55 31.3200 -97.3300 251.000 457.0 78.614 4.720 -999.990 -999.990 0.786 ..P WKT 2010 06 20 09 44 55 31.3200 -97.3300 251.000 30.0 105.367 3.940 -999.990 -999.990 1.054 ..P WKT 2010 06 20 09 49 55 31.3200 -97.3300 251.000 122.0 109.382 4.450 -999.990 -999.990 1.094 ..P WKT 2010 06 20 09 54 55 31.3200 -97.3300 251.000 457.0 83.369 4.250 -999.990 -999.990 0.834 ..P WKT 2010 06 20 09 59 55 31.3200 -97.3300 251.000 30.0 105.947 4.410 -999.990 -999.990 1.059 ..P WKT 2010 06 20 10 04 55 31.3200 -97.3300 251.000 122.0 97.679 4.700 -999.990 -999.990 0.977 ..P WKT 2010 06 20 10 09 55 31.3200 -97.3300 251.000 457.0 70.577 4.320 -999.990 -999.990 0.706 ..P WKT 2010 06 20 10 19 55 31.3200 -97.3300 251.000 30.0 99.626 4.610 -999.990 -999.990 0.996 ..P WKT 2010 06 20 10 24 55 31.3200 -97.3300 251.000 122.0 102.003 5.470 -999.990 -999.990 1.020 ..P WKT 2010 06 20 10 29 55 31.3200 -97.3300 251.000 457.0 78.998 4.760 -999.990 -999.990 0.790 ..P WKT 2010 06 20 10 34 55 31.3200 -97.3300 251.000 30.0 101.298 3.900 -999.990 -999.990 1.013 ..P WKT 2010 06 20 10 39 55 31.3200 -97.3300 251.000 122.0 100.673 4.110 -999.990 -999.990 1.007 ..P WKT 2010 06 20 10 44 55 31.3200 -97.3300 251.000 457.0 76.579 4.280 -999.990 -999.990 0.766 ..P WKT 2010 06 20 10 54 55 31.3200 -97.3300 251.000 30.0 97.298 4.100 -999.990 -999.990 0.973 ..P WKT 2010 06 20 10 59 55 31.3200 -97.3300 251.000 122.0 95.172 4.120 -999.990 -999.990 0.952 ..P WKT 2010 06 20 11 04 55 31.3200 -97.3300 251.000 457.0 76.674 4.670 -999.990 -999.990 0.767 ..P WKT 2010 06 20 11 09 55 31.3200 -97.3300 251.000 30.0 95.287 4.200 -999.990 -999.990 0.953 ..P WKT 2010 06 20 11 14 55 31.3200 -97.3300 251.000 122.0 100.120 4.100 -999.990 -999.990 1.001 ..P WKT 2010 06 20 11 19 55 31.3200 -97.3300 251.000 457.0 78.895 4.150 -999.990 -999.990 0.789 ..P WKT 2010 06 20 11 29 55 31.3200 -97.3300 251.000 30.0 96.073 5.290 -999.990 -999.990 0.961 ..P WKT 2010 06 20 11 34 55 31.3200 -97.3300 251.000 122.0 97.777 4.310 -999.990 -999.990 0.978 ..P WKT 2010 06 20 11 39 55 31.3200 -97.3300 251.000 457.0 78.610 4.060 -999.990 -999.990 0.786 ..P WKT 2010 06 20 11 44 55 31.3200 -97.3300 251.000 30.0 98.730 4.230 -999.990 -999.990 0.987 ..P WKT 2010 06 20 11 49 55 31.3200 -97.3300 251.000 122.0 93.204 4.160 -999.990 -999.990 0.932 ..P WKT 2010 06 20 12 09 55 31.3200 -97.3300 251.000 457.0 85.262 3.510 -999.990 -999.990 0.853 ..P WKT 2010 06 20 12 10 25 31.3200 -97.3300 251.000 457.0 82.903 5.110 -999.990 -999.990 0.829 ..P WKT 2010 06 20 12 10 55 31.3200 -97.3300 251.000 457.0 80.269 3.840 -999.990 -999.990 0.803 ..P WKT 2010 06 20 12 11 25 31.3200 -97.3300 251.000 457.0 79.956 4.110 -999.990 -999.990 0.800 ..P WKT 2010 06 20 12 11 55 31.3200 -97.3300 251.000 457.0 85.238 4.220 -999.990 -999.990 0.852 ..P WKT 2010 06 20 12 12 25 31.3200 -97.3300 251.000 457.0 82.604 3.890 -999.990 -999.990 0.826 ..P WKT 2010 06 20 12 12 55 31.3200 -97.3300 251.000 457.0 82.564 3.840 -999.990 -999.990 0.826 ..P WKT 2010 06 20 12 13 25 31.3200 -97.3300 251.000 457.0 84.024 3.790 -999.990 -999.990 0.840 ..P WKT 2010 06 20 12 13 55 31.3200 -97.3300 251.000 457.0 81.664 3.980 -999.990 -999.990 0.817 ..P WKT 2010 06 20 12 14 25 31.3200 -97.3300 251.000 457.0 82.580 3.820 -999.990 -999.990 0.826 ..P WKT 2010 06 20 12 14 55 31.3200 -97.3300 251.000 457.0 83.085 3.820 -999.990 -999.990 0.831 ..P WKT 2010 06 20 12 19 55 31.3200 -97.3300 251.000 30.0 88.141 4.180 -999.990 -999.990 0.881 ..P WKT 2010 06 20 12 24 55 31.3200 -97.3300 251.000 122.0 99.889 5.400 -999.990 -999.990 0.999 ..P WKT 2010 06 20 12 29 55 31.3200 -97.3300 251.000 457.0 86.243 4.400 -999.990 -999.990 0.862 ..P WKT 2010 06 20 12 34 55 31.3200 -97.3300 251.000 30.0 94.035 3.880 -999.990 -999.990 0.940 ..P WKT 2010 06 20 12 39 55 31.3200 -97.3300 251.000 122.0 99.780 4.330 -999.990 -999.990 0.998 ..P WKT 2010 06 20 12 44 55 31.3200 -97.3300 251.000 457.0 88.312 4.030 -999.990 -999.990 0.883 ..P WKT 2010 06 20 12 54 55 31.3200 -97.3300 251.000 30.0 96.991 3.460 -999.990 -999.990 0.970 ..P WKT 2010 06 20 12 59 55 31.3200 -97.3300 251.000 122.0 93.636 3.910 -999.990 -999.990 0.936 ..P WKT 2010 06 20 13 04 55 31.3200 -97.3300 251.000 457.0 80.708 3.520 -999.990 -999.990 0.807 ..P WKT 2010 06 20 13 09 55 31.3200 -97.3300 251.000 30.0 88.837 3.710 -999.990 -999.990 0.888 ..P WKT 2010 06 20 13 14 55 31.3200 -97.3300 251.000 122.0 96.422 4.200 -999.990 -999.990 0.964 ..P WKT 2010 06 20 13 19 55 31.3200 -97.3300 251.000 457.0 76.373 3.590 -999.990 -999.990 0.764 ..P WKT 2010 06 20 13 29 55 31.3200 -97.3300 251.000 30.0 88.515 3.820 -999.990 -999.990 0.885 ..P WKT 2010 06 20 13 34 55 31.3200 -97.3300 251.000 122.0 91.432 3.940 -999.990 -999.990 0.914 ..P WKT 2010 06 20 13 39 55 31.3200 -97.3300 251.000 457.0 74.632 3.790 -999.990 -999.990 0.746 ..P WKT 2010 06 20 13 44 55 31.3200 -97.3300 251.000 30.0 84.943 4.660 -999.990 -999.990 0.849 ..P WKT 2010 06 20 13 49 55 31.3200 -97.3300 251.000 122.0 84.847 3.900 -999.990 -999.990 0.848 ..P WKT 2010 06 20 13 54 55 31.3200 -97.3300 251.000 457.0 75.434 4.680 -999.990 -999.990 0.754 ..P WKT 2010 06 20 14 04 55 31.3200 -97.3300 251.000 30.0 79.076 4.220 -999.990 -999.990 0.791 ..P WKT 2010 06 20 14 09 55 31.3200 -97.3300 251.000 122.0 92.688 4.360 -999.990 -999.990 0.927 ..P WKT 2010 06 20 14 14 55 31.3200 -97.3300 251.000 457.0 78.334 4.380 -999.990 -999.990 0.783 ..P WKT 2010 06 20 14 19 55 31.3200 -97.3300 251.000 30.0 83.173 4.280 -999.990 -999.990 0.832 ..P WKT 2010 06 20 14 24 55 31.3200 -97.3300 251.000 122.0 88.564 5.450 -999.990 -999.990 0.886 ..P WKT 2010 06 20 14 29 55 31.3200 -97.3300 251.000 457.0 70.633 4.420 -999.990 -999.990 0.706 ..P WKT 2010 06 20 14 39 55 31.3200 -97.3300 251.000 30.0 92.826 4.810 -999.990 -999.990 0.928 ..P WKT 2010 06 20 14 44 55 31.3200 -97.3300 251.000 122.0 96.732 4.920 -999.990 -999.990 0.967 ..P WKT 2010 06 20 14 49 55 31.3200 -97.3300 251.000 457.0 77.023 5.530 -999.990 -999.990 0.770 ..P WKT 2010 06 20 14 54 55 31.3200 -97.3300 251.000 30.0 78.730 6.130 -999.990 -999.990 0.787 ..P WKT 2010 06 20 14 59 55 31.3200 -97.3300 251.000 122.0 89.504 4.240 -999.990 -999.990 0.895 ..P WKT 2010 06 20 15 04 55 31.3200 -97.3300 251.000 457.0 80.910 4.450 -999.990 -999.990 0.809 ..P WKT 2010 06 20 15 14 55 31.3200 -97.3300 251.000 30.0 90.867 4.330 -999.990 -999.990 0.909 ..P WKT 2010 06 20 15 19 55 31.3200 -97.3300 251.000 122.0 97.331 4.520 -999.990 -999.990 0.973 ..P WKT 2010 06 20 15 24 55 31.3200 -97.3300 251.000 457.0 85.786 4.040 -999.990 -999.990 0.858 ..P WKT 2010 06 20 15 29 55 31.3200 -97.3300 251.000 30.0 88.126 4.070 -999.990 -999.990 0.881 ..P WKT 2010 06 20 15 34 55 31.3200 -97.3300 251.000 122.0 91.155 5.370 -999.990 -999.990 0.912 ..P WKT 2010 06 20 15 39 55 31.3200 -97.3300 251.000 457.0 86.205 3.910 -999.990 -999.990 0.862 ..P WKT 2010 06 20 15 49 55 31.3200 -97.3300 251.000 30.0 90.613 4.070 -999.990 -999.990 0.906 ..P WKT 2010 06 20 15 54 55 31.3200 -97.3300 251.000 122.0 95.297 4.400 -999.990 -999.990 0.953 ..P WKT 2010 06 20 15 59 55 31.3200 -97.3300 251.000 457.0 88.554 3.610 -999.990 -999.990 0.886 ..P WKT 2010 06 20 16 04 55 31.3200 -97.3300 251.000 30.0 84.701 3.670 -999.990 -999.990 0.847 ..P WKT 2010 06 20 16 09 55 31.3200 -97.3300 251.000 122.0 90.488 3.960 -999.990 -999.990 0.905 ..P WKT 2010 06 20 16 14 55 31.3200 -97.3300 251.000 457.0 85.807 3.670 -999.990 -999.990 0.858 ..P WKT 2010 06 20 16 24 55 31.3200 -97.3300 251.000 30.0 91.954 5.260 -999.990 -999.990 0.920 ..P WKT 2010 06 20 16 29 55 31.3200 -97.3300 251.000 122.0 100.721 4.250 -999.990 -999.990 1.007 ..P WKT 2010 06 20 16 34 55 31.3200 -97.3300 251.000 457.0 88.533 3.880 -999.990 -999.990 0.885 ..P WKT 2010 06 20 16 39 55 31.3200 -97.3300 251.000 30.0 96.337 3.270 -999.990 -999.990 0.963 ..P WKT 2010 06 20 16 44 55 31.3200 -97.3300 251.000 122.0 103.592 4.580 -999.990 -999.990 1.036 ..P WKT 2010 06 20 16 49 55 31.3200 -97.3300 251.000 457.0 91.675 3.950 -999.990 -999.990 0.917 ..P WKT 2010 06 20 17 04 55 31.3200 -97.3300 251.000 30.0 103.605 3.200 -999.990 -999.990 1.036 ..P WKT 2010 06 20 17 09 55 31.3200 -97.3300 251.000 122.0 104.286 4.320 -999.990 -999.990 1.043 ..P WKT 2010 06 20 17 14 55 31.3200 -97.3300 251.000 457.0 95.853 4.730 -999.990 -999.990 0.959 ..P WKT 2010 06 20 17 19 55 31.3200 -97.3300 251.000 30.0 96.257 4.560 -999.990 -999.990 0.963 ..P WKT 2010 06 20 17 24 55 31.3200 -97.3300 251.000 122.0 103.292 5.340 -999.990 -999.990 1.033 ..P WKT 2010 06 20 17 29 55 31.3200 -97.3300 251.000 457.0 95.683 3.610 -999.990 -999.990 0.957 ..P WKT 2010 06 20 17 39 55 31.3200 -97.3300 251.000 30.0 97.612 3.490 -999.990 -999.990 0.976 ..P WKT 2010 06 20 17 44 55 31.3200 -97.3300 251.000 122.0 99.137 4.800 -999.990 -999.990 0.991 ..P WKT 2010 06 20 17 49 55 31.3200 -97.3300 251.000 457.0 91.259 4.650 -999.990 -999.990 0.913 ..P WKT 2010 06 20 17 54 55 31.3200 -97.3300 251.000 30.0 90.847 4.660 -999.990 -999.990 0.908 ..P WKT 2010 06 20 17 59 55 31.3200 -97.3300 251.000 122.0 95.139 4.280 -999.990 -999.990 0.951 ..P WKT 2010 06 20 18 04 55 31.3200 -97.3300 251.000 457.0 81.998 4.300 -999.990 -999.990 0.820 ..P WKT 2010 06 20 18 14 55 31.3200 -97.3300 251.000 30.0 85.323 3.330 -999.990 -999.990 0.853 ..P WKT 2010 06 20 18 19 55 31.3200 -97.3300 251.000 122.0 90.725 4.260 -999.990 -999.990 0.907 ..P WKT 2010 06 20 18 24 55 31.3200 -97.3300 251.000 457.0 81.726 4.430 -999.990 -999.990 0.817 ..P WKT 2010 06 20 18 29 55 31.3200 -97.3300 251.000 30.0 86.298 4.390 -999.990 -999.990 0.863 ..P WKT 2010 06 20 18 34 55 31.3200 -97.3300 251.000 122.0 90.872 3.090 -999.990 -999.990 0.909 ..P WKT 2010 06 20 18 39 55 31.3200 -97.3300 251.000 457.0 89.351 3.120 -999.990 -999.990 0.894 ..P WKT 2010 06 20 18 49 55 31.3200 -97.3300 251.000 30.0 90.426 3.210 -999.990 -999.990 0.904 ..P WKT 2010 06 20 18 54 55 31.3200 -97.3300 251.000 122.0 92.192 2.950 -999.990 -999.990 0.922 ..P WKT 2010 06 20 18 59 55 31.3200 -97.3300 251.000 457.0 85.222 4.150 -999.990 -999.990 0.852 ..P WKT 2010 06 20 19 04 55 31.3200 -97.3300 251.000 30.0 88.652 3.370 -999.990 -999.990 0.887 ..P WKT 2010 06 20 19 09 55 31.3200 -97.3300 251.000 122.0 93.609 3.670 -999.990 -999.990 0.936 ..P WKT 2010 06 20 19 14 55 31.3200 -97.3300 251.000 457.0 83.028 3.420 -999.990 -999.990 0.830 ..P WKT 2010 06 20 19 24 55 31.3200 -97.3300 251.000 30.0 93.005 4.100 -999.990 -999.990 0.930 ..P WKT 2010 06 20 19 29 55 31.3200 -97.3300 251.000 122.0 93.029 4.440 -999.990 -999.990 0.930 ..P WKT 2010 06 20 19 34 55 31.3200 -97.3300 251.000 457.0 85.692 3.410 -999.990 -999.990 0.857 ..P WKT 2010 06 20 19 39 55 31.3200 -97.3300 251.000 30.0 87.937 3.390 -999.990 -999.990 0.879 ..P WKT 2010 06 20 19 44 55 31.3200 -97.3300 251.000 122.0 95.461 3.490 -999.990 -999.990 0.955 ..P WKT 2010 06 20 19 49 55 31.3200 -97.3300 251.000 457.0 87.147 3.290 -999.990 -999.990 0.871 ..P WKT 2010 06 20 19 59 55 31.3200 -97.3300 251.000 30.0 92.911 3.730 -999.990 -999.990 0.929 ..P WKT 2010 06 20 20 04 55 31.3200 -97.3300 251.000 122.0 97.404 3.570 -999.990 -999.990 0.974 ..P WKT 2010 06 20 20 09 55 31.3200 -97.3300 251.000 457.0 91.051 3.490 -999.990 -999.990 0.911 ..P WKT 2010 06 20 20 14 55 31.3200 -97.3300 251.000 30.0 88.729 4.400 -999.990 -999.990 0.887 ..P WKT 2010 06 20 20 19 55 31.3200 -97.3300 251.000 122.0 101.987 3.390 -999.990 -999.990 1.020 ..P WKT 2010 06 20 20 24 55 31.3200 -97.3300 251.000 457.0 87.423 4.110 -999.990 -999.990 0.874 ..P WKT 2010 06 20 20 34 55 31.3200 -97.3300 251.000 30.0 92.776 3.910 -999.990 -999.990 0.928 ..P WKT 2010 06 20 20 39 55 31.3200 -97.3300 251.000 122.0 97.394 3.300 -999.990 -999.990 0.974 ..P WKT 2010 06 20 20 44 55 31.3200 -97.3300 251.000 457.0 92.406 3.400 -999.990 -999.990 0.924 ..P WKT 2010 06 20 20 49 55 31.3200 -97.3300 251.000 30.0 92.568 3.440 -999.990 -999.990 0.926 ..P WKT 2010 06 20 20 54 55 31.3200 -97.3300 251.000 122.0 104.014 3.610 -999.990 -999.990 1.040 ..P WKT 2010 06 20 20 59 55 31.3200 -97.3300 251.000 457.0 96.238 3.370 -999.990 -999.990 0.962 ..P WKT 2010 06 20 21 09 55 31.3200 -97.3300 251.000 30.0 95.768 3.680 -999.990 -999.990 0.958 ..P WKT 2010 06 20 21 14 55 31.3200 -97.3300 251.000 122.0 99.178 4.900 -999.990 -999.990 0.992 ..P WKT 2010 06 20 21 19 55 31.3200 -97.3300 251.000 457.0 93.943 3.750 -999.990 -999.990 0.939 ..P WKT 2010 06 20 21 24 55 31.3200 -97.3300 251.000 30.0 100.981 3.120 -999.990 -999.990 1.010 ..P WKT 2010 06 20 21 29 55 31.3200 -97.3300 251.000 122.0 109.974 4.220 -999.990 -999.990 1.100 ..P WKT 2010 06 20 21 34 55 31.3200 -97.3300 251.000 457.0 106.692 3.000 -999.990 -999.990 1.067 ..P WKT 2010 06 20 21 44 55 31.3200 -97.3300 251.000 30.0 111.650 3.030 -999.990 -999.990 1.117 ..P WKT 2010 06 20 21 49 55 31.3200 -97.3300 251.000 122.0 115.148 3.070 -999.990 -999.990 1.151 ..P WKT 2010 06 20 21 54 55 31.3200 -97.3300 251.000 457.0 104.683 4.330 -999.990 -999.990 1.047 ..P WKT 2010 06 20 21 59 55 31.3200 -97.3300 251.000 30.0 103.152 3.420 -999.990 -999.990 1.032 ..P WKT 2010 06 20 22 04 55 31.3200 -97.3300 251.000 122.0 102.459 3.110 -999.990 -999.990 1.025 ..P WKT 2010 06 20 22 09 55 31.3200 -97.3300 251.000 457.0 103.443 4.410 -999.990 -999.990 1.034 ..P WKT 2010 06 20 22 19 55 31.3200 -97.3300 251.000 30.0 98.342 3.080 -999.990 -999.990 0.983 ..P WKT 2010 06 20 22 24 55 31.3200 -97.3300 251.000 122.0 107.913 3.090 -999.990 -999.990 1.079 ..P WKT 2010 06 20 22 29 55 31.3200 -97.3300 251.000 457.0 100.149 2.940 -999.990 -999.990 1.001 ..P WKT 2010 06 20 22 34 55 31.3200 -97.3300 251.000 30.0 94.899 5.250 -999.990 -999.990 0.949 ..P WKT 2010 06 20 22 39 55 31.3200 -97.3300 251.000 122.0 106.434 4.720 -999.990 -999.990 1.064 ..P WKT 2010 06 20 22 44 55 31.3200 -97.3300 251.000 457.0 97.265 2.990 -999.990 -999.990 0.973 ..P WKT 2010 06 20 22 54 55 31.3200 -97.3300 251.000 30.0 94.435 3.040 -999.990 -999.990 0.944 ..P WKT 2010 06 20 22 59 55 31.3200 -97.3300 251.000 122.0 101.899 3.700 -999.990 -999.990 1.019 ..P WKT 2010 06 20 23 04 55 31.3200 -97.3300 251.000 457.0 100.264 3.610 -999.990 -999.990 1.003 ..P WKT 2010 06 20 23 09 55 31.3200 -97.3300 251.000 30.0 101.289 4.450 -999.990 -999.990 1.013 ..P WKT 2010 06 20 23 14 55 31.3200 -97.3300 251.000 122.0 106.518 3.420 -999.990 -999.990 1.065 ..P WKT 2010 06 20 23 19 55 31.3200 -97.3300 251.000 457.0 94.093 3.340 -999.990 -999.990 0.941 ..P WKT 2010 06 20 23 29 55 31.3200 -97.3300 251.000 30.0 91.516 3.430 -999.990 -999.990 0.915 ..P WKT 2010 06 20 23 34 55 31.3200 -97.3300 251.000 122.0 94.781 3.380 -999.990 -999.990 0.948 ..P WKT 2010 06 20 23 39 55 31.3200 -97.3300 251.000 457.0 94.402 3.910 -999.990 -999.990 0.944 ..P WKT 2010 06 20 23 44 55 31.3200 -97.3300 251.000 30.0 97.809 3.710 -999.990 -999.990 0.978 ..P WKT 2010 06 20 23 49 55 31.3200 -97.3300 251.000 122.0 102.902 3.560 -999.990 -999.990 1.029 ..P WKT 2010 06 21 00 09 55 31.3200 -97.3300 251.000 457.0 101.723 3.050 -999.990 -999.990 1.017 ..P WKT 2010 06 21 00 10 25 31.3200 -97.3300 251.000 457.0 96.948 3.660 -999.990 -999.990 0.969 ..P WKT 2010 06 21 00 10 55 31.3200 -97.3300 251.000 457.0 94.980 2.870 -999.990 -999.990 0.950 ..P WKT 2010 06 21 00 11 25 31.3200 -97.3300 251.000 457.0 99.046 3.840 -999.990 -999.990 0.990 ..P WKT 2010 06 21 00 11 55 31.3200 -97.3300 251.000 457.0 99.604 4.760 -999.990 -999.990 0.996 ..P WKT 2010 06 21 00 12 25 31.3200 -97.3300 251.000 457.0 94.128 3.730 -999.990 -999.990 0.941 ..P WKT 2010 06 21 00 12 55 31.3200 -97.3300 251.000 457.0 99.317 3.210 -999.990 -999.990 0.993 ..P WKT 2010 06 21 00 13 25 31.3200 -97.3300 251.000 457.0 100.576 3.400 -999.990 -999.990 1.006 ..P WKT 2010 06 21 00 13 55 31.3200 -97.3300 251.000 457.0 95.942 5.010 -999.990 -999.990 0.959 ..P WKT 2010 06 21 00 14 25 31.3200 -97.3300 251.000 457.0 91.027 3.990 -999.990 -999.990 0.910 ..P WKT 2010 06 21 00 14 55 31.3200 -97.3300 251.000 457.0 96.075 2.940 -999.990 -999.990 0.961 ..P WKT 2010 06 21 00 19 55 31.3200 -97.3300 251.000 30.0 98.707 4.210 -999.990 -999.990 0.987 ..P WKT 2010 06 21 00 24 55 31.3200 -97.3300 251.000 122.0 97.690 3.130 -999.990 -999.990 0.977 ..P WKT 2010 06 21 00 29 55 31.3200 -97.3300 251.000 457.0 100.743 2.960 -999.990 -999.990 1.007 ..P WKT 2010 06 21 00 34 55 31.3200 -97.3300 251.000 30.0 95.799 3.950 -999.990 -999.990 0.958 ..P WKT 2010 06 21 00 39 55 31.3200 -97.3300 251.000 122.0 106.846 3.880 -999.990 -999.990 1.068 ..P WKT 2010 06 21 00 44 55 31.3200 -97.3300 251.000 457.0 100.499 2.970 -999.990 -999.990 1.005 ..P WKT 2010 06 21 00 54 55 31.3200 -97.3300 251.000 30.0 93.084 3.960 -999.990 -999.990 0.931 ..P WKT 2010 06 21 00 59 55 31.3200 -97.3300 251.000 122.0 97.624 3.090 -999.990 -999.990 0.976 ..P WKT 2010 06 21 01 04 55 31.3200 -97.3300 251.000 457.0 99.641 3.410 -999.990 -999.990 0.996 ..P WKT 2010 06 21 01 09 55 31.3200 -97.3300 251.000 30.0 98.011 3.940 -999.990 -999.990 0.980 ..P WKT 2010 06 21 01 14 55 31.3200 -97.3300 251.000 122.0 100.026 4.260 -999.990 -999.990 1.000 ..P WKT 2010 06 21 01 19 55 31.3200 -97.3300 251.000 457.0 93.069 3.910 -999.990 -999.990 0.931 ..P WKT 2010 06 21 01 29 55 31.3200 -97.3300 251.000 30.0 99.142 3.350 -999.990 -999.990 0.991 ..P WKT 2010 06 21 01 34 55 31.3200 -97.3300 251.000 122.0 97.312 5.370 -999.990 -999.990 0.973 ..P WKT 2010 06 21 01 39 55 31.3200 -97.3300 251.000 457.0 93.239 4.050 -999.990 -999.990 0.932 ..P WKT 2010 06 21 01 44 55 31.3200 -97.3300 251.000 30.0 105.146 5.020 -999.990 -999.990 1.051 ..P WKT 2010 06 21 01 49 55 31.3200 -97.3300 251.000 122.0 104.437 3.720 -999.990 -999.990 1.044 ..P WKT 2010 06 21 01 54 55 31.3200 -97.3300 251.000 457.0 93.919 3.530 -999.990 -999.990 0.939 ..P WKT 2010 06 21 02 04 55 31.3200 -97.3300 251.000 30.0 100.911 3.630 -999.990 -999.990 1.009 ..P WKT 2010 06 21 02 09 55 31.3200 -97.3300 251.000 122.0 107.769 4.080 -999.990 -999.990 1.078 ..P WKT 2010 06 21 02 14 55 31.3200 -97.3300 251.000 457.0 101.176 3.650 -999.990 -999.990 1.012 ..P WKT 2010 06 21 02 19 55 31.3200 -97.3300 251.000 30.0 105.791 3.380 -999.990 -999.990 1.058 ..P WKT 2010 06 21 02 24 55 31.3200 -97.3300 251.000 122.0 107.884 3.670 -999.990 -999.990 1.079 ..P WKT 2010 06 21 02 29 55 31.3200 -97.3300 251.000 457.0 94.849 2.660 -999.990 -999.990 0.948 ..P WKT 2010 06 21 02 39 55 31.3200 -97.3300 251.000 30.0 100.196 3.980 -999.990 -999.990 1.002 ..P WKT 2010 06 21 02 44 55 31.3200 -97.3300 251.000 122.0 97.568 3.010 -999.990 -999.990 0.976 ..P WKT 2010 06 21 02 49 55 31.3200 -97.3300 251.000 457.0 101.382 3.820 -999.990 -999.990 1.014 ..P WKT 2010 06 21 02 54 55 31.3200 -97.3300 251.000 30.0 94.412 4.870 -999.990 -999.990 0.944 ..P WKT 2010 06 21 02 59 55 31.3200 -97.3300 251.000 122.0 100.466 3.740 -999.990 -999.990 1.005 ..P WKT 2010 06 21 03 04 55 31.3200 -97.3300 251.000 457.0 98.118 2.880 -999.990 -999.990 0.981 ..P WKT 2010 06 21 03 14 55 31.3200 -97.3300 251.000 30.0 104.803 3.410 -999.990 -999.990 1.048 ..P WKT 2010 06 21 03 19 55 31.3200 -97.3300 251.000 122.0 106.275 3.750 -999.990 -999.990 1.063 ..P WKT 2010 06 21 03 24 55 31.3200 -97.3300 251.000 457.0 93.048 4.420 -999.990 -999.990 0.930 ..P WKT 2010 06 21 03 29 55 31.3200 -97.3300 251.000 30.0 105.440 3.370 -999.990 -999.990 1.054 ..P WKT 2010 06 21 03 34 55 31.3200 -97.3300 251.000 122.0 104.532 2.790 -999.990 -999.990 1.045 ..P WKT 2010 06 21 03 39 55 31.3200 -97.3300 251.000 457.0 95.646 3.030 -999.990 -999.990 0.956 ..P WKT 2010 06 21 03 49 55 31.3200 -97.3300 251.000 30.0 107.807 3.690 -999.990 -999.990 1.078 ..P WKT 2010 06 21 03 54 55 31.3200 -97.3300 251.000 122.0 93.446 2.770 -999.990 -999.990 0.934 ..P WKT 2010 06 21 03 59 55 31.3200 -97.3300 251.000 457.0 81.045 4.050 -999.990 -999.990 0.810 ..P WKT 2010 06 21 04 04 55 31.3200 -97.3300 251.000 30.0 101.386 5.340 -999.990 -999.990 1.014 ..P WKT 2010 06 21 04 09 55 31.3200 -97.3300 251.000 122.0 90.526 4.540 -999.990 -999.990 0.905 ..P WKT 2010 06 21 04 14 55 31.3200 -97.3300 251.000 457.0 86.801 3.430 -999.990 -999.990 0.868 ..P WKT 2010 06 21 04 24 55 31.3200 -97.3300 251.000 30.0 100.776 3.180 -999.990 -999.990 1.008 ..P WKT 2010 06 21 04 29 55 31.3200 -97.3300 251.000 122.0 95.114 4.380 -999.990 -999.990 0.951 ..P WKT 2010 06 21 04 34 55 31.3200 -97.3300 251.000 457.0 89.452 6.250 -999.990 -999.990 0.895 ..P WKT 2010 06 21 04 39 55 31.3200 -97.3300 251.000 30.0 111.482 6.660 -999.990 -999.990 1.115 ..P WKT 2010 06 21 04 44 55 31.3200 -97.3300 251.000 122.0 108.896 5.350 -999.990 -999.990 1.089 ..P WKT 2010 06 21 04 49 55 31.3200 -97.3300 251.000 457.0 103.934 3.580 -999.990 -999.990 1.039 ..P WKT 2010 06 21 05 04 55 31.3200 -97.3300 251.000 30.0 112.839 5.430 -999.990 -999.990 1.128 ..P WKT 2010 06 21 05 09 55 31.3200 -97.3300 251.000 122.0 105.091 5.930 -999.990 -999.990 1.051 ..P WKT 2010 06 21 05 14 55 31.3200 -97.3300 251.000 457.0 94.269 6.150 -999.990 -999.990 0.943 ..P WKT 2010 06 21 05 19 55 31.3200 -97.3300 251.000 30.0 108.330 5.540 -999.990 -999.990 1.083 ..P WKT 2010 06 21 05 24 55 31.3200 -97.3300 251.000 122.0 108.692 3.170 -999.990 -999.990 1.087 ..P WKT 2010 06 21 05 29 55 31.3200 -97.3300 251.000 457.0 85.572 3.380 -999.990 -999.990 0.856 ..P WKT 2010 06 21 05 39 55 31.3200 -97.3300 251.000 30.0 109.067 4.190 -999.990 -999.990 1.091 ..P WKT 2010 06 21 05 44 55 31.3200 -97.3300 251.000 122.0 121.575 2.520 -999.990 -999.990 1.216 ..P WKT 2010 06 21 05 49 55 31.3200 -97.3300 251.000 457.0 77.631 2.840 -999.990 -999.990 0.776 ..P WKT 2010 06 21 05 54 55 31.3200 -97.3300 251.000 30.0 111.378 3.460 -999.990 -999.990 1.114 ..P WKT 2010 06 21 05 59 55 31.3200 -97.3300 251.000 122.0 114.662 3.050 -999.990 -999.990 1.147 ..P WKT 2010 06 21 06 04 55 31.3200 -97.3300 251.000 457.0 80.506 1.670 -999.990 -999.990 0.805 ..P WKT 2010 06 21 06 14 55 31.3200 -97.3300 251.000 30.0 112.123 2.920 -999.990 -999.990 1.121 ..P WKT 2010 06 21 06 19 55 31.3200 -97.3300 251.000 122.0 105.809 2.050 -999.990 -999.990 1.058 ..P WKT 2010 06 21 06 24 55 31.3200 -97.3300 251.000 457.0 82.736 1.810 -999.990 -999.990 0.827 ..P WKT 2010 06 21 06 29 55 31.3200 -97.3300 251.000 30.0 98.491 2.280 -999.990 -999.990 0.985 ..P WKT 2010 06 21 06 34 55 31.3200 -97.3300 251.000 122.0 102.514 2.610 -999.990 -999.990 1.025 ..P WKT 2010 06 21 06 39 55 31.3200 -97.3300 251.000 457.0 81.959 2.320 -999.990 -999.990 0.820 ..P WKT 2010 06 21 06 49 55 31.3200 -97.3300 251.000 30.0 92.817 3.030 -999.990 -999.990 0.928 ..P WKT 2010 06 21 06 54 55 31.3200 -97.3300 251.000 122.0 93.787 2.510 -999.990 -999.990 0.938 ..P WKT 2010 06 21 06 59 55 31.3200 -97.3300 251.000 457.0 84.426 2.580 -999.990 -999.990 0.844 ..P WKT 2010 06 21 07 04 55 31.3200 -97.3300 251.000 30.0 90.701 3.770 -999.990 -999.990 0.907 ..P WKT 2010 06 21 07 09 55 31.3200 -97.3300 251.000 122.0 95.301 1.970 -999.990 -999.990 0.953 ..P WKT 2010 06 21 07 14 55 31.3200 -97.3300 251.000 457.0 84.128 2.140 -999.990 -999.990 0.841 ..P WKT 2010 06 21 07 24 55 31.3200 -97.3300 251.000 30.0 90.575 2.930 -999.990 -999.990 0.906 ..P WKT 2010 06 21 07 29 55 31.3200 -97.3300 251.000 122.0 90.608 1.780 -999.990 -999.990 0.906 ..P WKT 2010 06 21 07 34 55 31.3200 -97.3300 251.000 457.0 82.547 2.020 -999.990 -999.990 0.825 ..P WKT 2010 06 21 07 39 55 31.3200 -97.3300 251.000 30.0 86.627 2.140 -999.990 -999.990 0.866 ..P WKT 2010 06 21 07 44 55 31.3200 -97.3300 251.000 122.0 87.079 2.260 -999.990 -999.990 0.871 ..P WKT 2010 06 21 07 49 55 31.3200 -97.3300 251.000 457.0 81.671 2.690 -999.990 -999.990 0.817 ..P WKT 2010 06 21 07 59 55 31.3200 -97.3300 251.000 30.0 84.647 1.830 -999.990 -999.990 0.846 ..P WKT 2010 06 21 08 04 55 31.3200 -97.3300 251.000 122.0 91.356 2.460 -999.990 -999.990 0.914 ..P WKT 2010 06 21 08 09 55 31.3200 -97.3300 251.000 457.0 81.467 2.320 -999.990 -999.990 0.815 ..P WKT 2010 06 21 08 14 55 31.3200 -97.3300 251.000 30.0 85.246 1.770 -999.990 -999.990 0.852 ..P WKT 2010 06 21 08 19 55 31.3200 -97.3300 251.000 122.0 92.372 3.410 -999.990 -999.990 0.924 ..P WKT 2010 06 21 08 24 55 31.3200 -97.3300 251.000 457.0 86.528 3.530 -999.990 -999.990 0.865 ..P WKT 2010 06 21 08 34 55 31.3200 -97.3300 251.000 30.0 93.686 2.710 -999.990 -999.990 0.937 ..P WKT 2010 06 21 08 39 55 31.3200 -97.3300 251.000 122.0 110.728 2.290 -999.990 -999.990 1.107 ..P WKT 2010 06 21 08 44 55 31.3200 -97.3300 251.000 457.0 74.930 1.760 -999.990 -999.990 0.749 ..P WKT 2010 06 21 08 49 55 31.3200 -97.3300 251.000 30.0 92.668 3.040 -999.990 -999.990 0.927 ..P WKT 2010 06 21 08 54 55 31.3200 -97.3300 251.000 122.0 99.811 1.260 -999.990 -999.990 0.998 ..P WKT 2010 06 21 08 59 55 31.3200 -97.3300 251.000 457.0 81.026 1.900 -999.990 -999.990 0.810 ..P WKT 2010 06 21 09 09 55 31.3200 -97.3300 251.000 30.0 89.415 2.370 -999.990 -999.990 0.894 ..P WKT 2010 06 21 09 14 55 31.3200 -97.3300 251.000 122.0 92.614 2.420 -999.990 -999.990 0.926 ..P WKT 2010 06 21 09 19 55 31.3200 -97.3300 251.000 457.0 85.500 1.540 -999.990 -999.990 0.855 ..P WKT 2010 06 21 09 24 55 31.3200 -97.3300 251.000 30.0 95.387 1.750 -999.990 -999.990 0.954 ..P WKT 2010 06 21 09 29 55 31.3200 -97.3300 251.000 122.0 92.732 1.680 -999.990 -999.990 0.927 ..P WKT 2010 06 21 09 34 55 31.3200 -97.3300 251.000 457.0 81.997 1.530 -999.990 -999.990 0.820 ..P WKT 2010 06 21 09 44 55 31.3200 -97.3300 251.000 30.0 93.288 2.290 -999.990 -999.990 0.933 ..P WKT 2010 06 21 09 49 55 31.3200 -97.3300 251.000 122.0 96.366 2.630 -999.990 -999.990 0.964 ..P WKT 2010 06 21 09 54 55 31.3200 -97.3300 251.000 457.0 85.235 2.220 -999.990 -999.990 0.852 ..P WKT 2010 06 21 09 59 55 31.3200 -97.3300 251.000 30.0 100.012 2.650 -999.990 -999.990 1.000 ..P WKT 2010 06 21 10 04 55 31.3200 -97.3300 251.000 122.0 99.189 3.410 -999.990 -999.990 0.992 ..P WKT 2010 06 21 10 09 55 31.3200 -97.3300 251.000 457.0 69.400 4.370 -999.990 -999.990 0.694 ..P WKT 2010 06 21 10 19 55 31.3200 -97.3300 251.000 30.0 97.873 2.500 -999.990 -999.990 0.979 ..P WKT 2010 06 21 10 24 55 31.3200 -97.3300 251.000 122.0 97.369 4.000 -999.990 -999.990 0.974 ..P WKT 2010 06 21 10 29 55 31.3200 -97.3300 251.000 457.0 71.526 2.890 -999.990 -999.990 0.715 ..P WKT 2010 06 21 10 34 55 31.3200 -97.3300 251.000 30.0 99.145 3.070 -999.990 -999.990 0.991 ..P WKT 2010 06 21 10 39 55 31.3200 -97.3300 251.000 122.0 95.856 2.820 -999.990 -999.990 0.959 ..P WKT 2010 06 21 10 44 55 31.3200 -97.3300 251.000 457.0 74.194 2.930 -999.990 -999.990 0.742 ..P WKT 2010 06 21 10 54 55 31.3200 -97.3300 251.000 30.0 92.574 2.650 -999.990 -999.990 0.926 ..P WKT 2010 06 21 10 59 55 31.3200 -97.3300 251.000 122.0 95.032 2.810 -999.990 -999.990 0.950 ..P WKT 2010 06 21 11 04 55 31.3200 -97.3300 251.000 457.0 71.468 3.810 -999.990 -999.990 0.715 ..P WKT 2010 06 21 11 09 55 31.3200 -97.3300 251.000 30.0 93.547 2.570 -999.990 -999.990 0.935 ..P WKT 2010 06 21 11 14 55 31.3200 -97.3300 251.000 122.0 97.118 3.500 -999.990 -999.990 0.971 ..P WKT 2010 06 21 11 19 55 31.3200 -97.3300 251.000 457.0 71.193 2.680 -999.990 -999.990 0.712 ..P WKT 2010 06 21 11 29 55 31.3200 -97.3300 251.000 30.0 93.681 3.230 -999.990 -999.990 0.937 ..P WKT 2010 06 21 11 34 55 31.3200 -97.3300 251.000 122.0 98.962 2.830 -999.990 -999.990 0.990 ..P WKT 2010 06 21 11 39 55 31.3200 -97.3300 251.000 457.0 76.702 2.790 -999.990 -999.990 0.767 ..P WKT 2010 06 21 11 44 55 31.3200 -97.3300 251.000 30.0 97.979 3.910 -999.990 -999.990 0.980 ..P WKT 2010 06 21 11 49 55 31.3200 -97.3300 251.000 122.0 94.637 3.110 -999.990 -999.990 0.946 ..P WKT 2010 06 21 12 09 55 31.3200 -97.3300 251.000 457.0 71.204 3.030 -999.990 -999.990 0.712 ..P WKT 2010 06 21 12 10 25 31.3200 -97.3300 251.000 457.0 72.426 3.590 -999.990 -999.990 0.724 ..P WKT 2010 06 21 12 10 55 31.3200 -97.3300 251.000 457.0 76.290 3.740 -999.990 -999.990 0.763 ..P WKT 2010 06 21 12 11 25 31.3200 -97.3300 251.000 457.0 69.445 3.180 -999.990 -999.990 0.694 ..P WKT 2010 06 21 12 11 55 31.3200 -97.3300 251.000 457.0 73.171 3.780 -999.990 -999.990 0.732 ..P WKT 2010 06 21 12 12 25 31.3200 -97.3300 251.000 457.0 67.995 3.120 -999.990 -999.990 0.680 ..P WKT 2010 06 21 12 12 55 31.3200 -97.3300 251.000 457.0 69.634 3.270 -999.990 -999.990 0.696 ..P WKT 2010 06 21 12 13 25 31.3200 -97.3300 251.000 457.0 65.571 2.550 -999.990 -999.990 0.656 ..P WKT 2010 06 21 12 13 55 31.3200 -97.3300 251.000 457.0 68.323 3.400 -999.990 -999.990 0.683 ..P WKT 2010 06 21 12 14 25 31.3200 -97.3300 251.000 457.0 77.472 3.950 -999.990 -999.990 0.775 ..P WKT 2010 06 21 12 14 55 31.3200 -97.3300 251.000 457.0 72.575 2.910 -999.990 -999.990 0.726 ..P WKT 2010 06 21 12 19 55 31.3200 -97.3300 251.000 30.0 94.391 3.000 -999.990 -999.990 0.944 ..P WKT 2010 06 21 12 24 55 31.3200 -97.3300 251.000 122.0 99.658 2.920 -999.990 -999.990 0.997 ..P WKT 2010 06 21 12 29 55 31.3200 -97.3300 251.000 457.0 70.290 2.800 -999.990 -999.990 0.703 ..P WKT 2010 06 21 12 34 55 31.3200 -97.3300 251.000 30.0 98.925 2.720 -999.990 -999.990 0.989 ..P WKT 2010 06 21 12 39 55 31.3200 -97.3300 251.000 122.0 104.610 2.670 -999.990 -999.990 1.046 ..P WKT 2010 06 21 12 44 55 31.3200 -97.3300 251.000 457.0 76.352 2.580 -999.990 -999.990 0.764 ..P WKT 2010 06 21 12 54 55 31.3200 -97.3300 251.000 30.0 107.929 2.520 -999.990 -999.990 1.079 ..P WKT 2010 06 21 12 59 55 31.3200 -97.3300 251.000 122.0 103.076 2.530 -999.990 -999.990 1.031 ..P WKT 2010 06 21 13 04 55 31.3200 -97.3300 251.000 457.0 73.458 2.530 -999.990 -999.990 0.735 ..P WKT 2010 06 21 13 09 55 31.3200 -97.3300 251.000 30.0 99.770 2.200 -999.990 -999.990 0.998 ..P WKT 2010 06 21 13 14 55 31.3200 -97.3300 251.000 122.0 106.327 2.110 -999.990 -999.990 1.063 ..P WKT 2010 06 21 13 19 55 31.3200 -97.3300 251.000 457.0 70.305 2.420 -999.990 -999.990 0.703 ..P WKT 2010 06 21 13 29 55 31.3200 -97.3300 251.000 30.0 96.338 1.470 -999.990 -999.990 0.963 ..P WKT 2010 06 21 13 34 55 31.3200 -97.3300 251.000 122.0 97.727 2.210 -999.990 -999.990 0.977 ..P WKT 2010 06 21 13 39 55 31.3200 -97.3300 251.000 457.0 75.456 3.650 -999.990 -999.990 0.755 ..P WKT 2010 06 21 13 44 55 31.3200 -97.3300 251.000 30.0 97.720 3.910 -999.990 -999.990 0.977 ..P WKT 2010 06 21 13 49 55 31.3200 -97.3300 251.000 122.0 101.336 3.330 -999.990 -999.990 1.013 ..P WKT 2010 06 21 13 54 55 31.3200 -97.3300 251.000 457.0 84.351 3.720 -999.990 -999.990 0.844 ..P WKT 2010 06 21 14 04 55 31.3200 -97.3300 251.000 30.0 98.184 2.610 -999.990 -999.990 0.982 ..P WKT 2010 06 21 14 09 55 31.3200 -97.3300 251.000 122.0 99.493 3.410 -999.990 -999.990 0.995 ..P WKT 2010 06 21 14 14 55 31.3200 -97.3300 251.000 457.0 93.285 4.180 -999.990 -999.990 0.933 ..P WKT 2010 06 21 14 19 55 31.3200 -97.3300 251.000 30.0 97.101 3.160 -999.990 -999.990 0.971 ..P WKT 2010 06 21 14 24 55 31.3200 -97.3300 251.000 122.0 98.688 2.230 -999.990 -999.990 0.987 ..P WKT 2010 06 21 14 29 55 31.3200 -97.3300 251.000 457.0 89.417 2.200 -999.990 -999.990 0.894 ..P WKT 2010 06 21 14 39 55 31.3200 -97.3300 251.000 30.0 94.879 3.240 -999.990 -999.990 0.949 ..P WKT 2010 06 21 14 44 55 31.3200 -97.3300 251.000 122.0 100.843 2.340 -999.990 -999.990 1.008 ..P WKT 2010 06 21 14 49 55 31.3200 -97.3300 251.000 457.0 85.364 2.650 -999.990 -999.990 0.854 ..P WKT 2010 06 21 14 54 55 31.3200 -97.3300 251.000 30.0 87.151 2.620 -999.990 -999.990 0.872 ..P WKT 2010 06 21 14 59 55 31.3200 -97.3300 251.000 122.0 89.355 3.520 -999.990 -999.990 0.894 ..P WKT 2010 06 21 15 04 55 31.3200 -97.3300 251.000 457.0 85.433 4.820 -999.990 -999.990 0.854 ..P WKT 2010 06 21 15 14 55 31.3200 -97.3300 251.000 30.0 91.414 2.280 -999.990 -999.990 0.914 ..P WKT 2010 06 21 15 19 55 31.3200 -97.3300 251.000 122.0 93.241 2.240 -999.990 -999.990 0.932 ..P WKT 2010 06 21 15 24 55 31.3200 -97.3300 251.000 457.0 88.243 2.320 -999.990 -999.990 0.882 ..P WKT 2010 06 21 15 29 55 31.3200 -97.3300 251.000 30.0 91.741 3.220 -999.990 -999.990 0.917 ..P WKT 2010 06 21 15 34 55 31.3200 -97.3300 251.000 122.0 97.887 2.770 -999.990 -999.990 0.979 ..P WKT 2010 06 21 15 39 55 31.3200 -97.3300 251.000 457.0 93.306 2.770 -999.990 -999.990 0.933 ..P WKT 2010 06 21 15 49 55 31.3200 -97.3300 251.000 30.0 99.409 3.590 -999.990 -999.990 0.994 ..P WKT 2010 06 21 15 54 55 31.3200 -97.3300 251.000 122.0 104.799 2.940 -999.990 -999.990 1.048 ..P WKT 2010 06 21 15 59 55 31.3200 -97.3300 251.000 457.0 92.078 5.180 -999.990 -999.990 0.921 ..P WKT 2010 06 21 16 04 55 31.3200 -97.3300 251.000 30.0 104.435 6.500 -999.990 -999.990 1.044 ..P WKT 2010 06 21 16 09 55 31.3200 -97.3300 251.000 122.0 105.507 5.070 -999.990 -999.990 1.055 ..P WKT 2010 06 21 16 14 55 31.3200 -97.3300 251.000 457.0 109.505 3.570 -999.990 -999.990 1.095 ..P WKT 2010 06 21 16 24 55 31.3200 -97.3300 251.000 30.0 105.498 3.650 -999.990 -999.990 1.055 ..P WKT 2010 06 21 16 29 55 31.3200 -97.3300 251.000 122.0 117.141 5.030 -999.990 -999.990 1.171 ..P WKT 2010 06 21 16 34 55 31.3200 -97.3300 251.000 457.0 97.568 5.790 -999.990 -999.990 0.976 ..P WKT 2010 06 21 16 39 55 31.3200 -97.3300 251.000 30.0 100.432 4.580 -999.990 -999.990 1.004 ..P WKT 2010 06 21 16 44 55 31.3200 -97.3300 251.000 122.0 106.084 6.590 -999.990 -999.990 1.061 ..P WKT 2010 06 21 16 49 55 31.3200 -97.3300 251.000 457.0 91.944 2.570 -999.990 -999.990 0.919 ..P WKT 2010 06 21 17 04 55 31.3200 -97.3300 251.000 30.0 89.016 4.220 -999.990 -999.990 0.890 ..P WKT 2010 06 21 17 09 55 31.3200 -97.3300 251.000 122.0 96.157 4.460 -999.990 -999.990 0.962 ..P WKT 2010 06 21 17 14 55 31.3200 -97.3300 251.000 457.0 86.848 5.090 -999.990 -999.990 0.868 ..P WKT 2010 06 21 17 19 55 31.3200 -97.3300 251.000 30.0 93.152 3.450 -999.990 -999.990 0.932 ..P WKT 2010 06 21 17 24 55 31.3200 -97.3300 251.000 122.0 102.246 2.300 -999.990 -999.990 1.022 ..P WKT 2010 06 21 17 29 55 31.3200 -97.3300 251.000 457.0 91.542 1.690 -999.990 -999.990 0.915 ..P WKT 2010 06 21 17 39 55 31.3200 -97.3300 251.000 30.0 97.247 1.740 -999.990 -999.990 0.972 ..P WKT 2010 06 21 17 44 55 31.3200 -97.3300 251.000 122.0 96.925 1.590 -999.990 -999.990 0.969 ..P WKT 2010 06 21 17 49 55 31.3200 -97.3300 251.000 457.0 91.305 2.780 -999.990 -999.990 0.913 ..P WKT 2010 06 21 17 54 55 31.3200 -97.3300 251.000 30.0 88.751 2.410 -999.990 -999.990 0.888 ..P WKT 2010 06 21 17 59 55 31.3200 -97.3300 251.000 122.0 94.565 2.550 -999.990 -999.990 0.946 ..P WKT 2010 06 21 18 04 55 31.3200 -97.3300 251.000 457.0 91.175 1.790 -999.990 -999.990 0.912 ..P WKT 2010 06 21 18 14 55 31.3200 -97.3300 251.000 30.0 98.539 1.990 -999.990 -999.990 0.985 ..P WKT 2010 06 21 18 19 55 31.3200 -97.3300 251.000 122.0 101.485 3.410 -999.990 -999.990 1.015 ..P WKT 2010 06 21 18 24 55 31.3200 -97.3300 251.000 457.0 92.436 3.460 -999.990 -999.990 0.924 ..P WKT 2010 06 21 18 29 55 31.3200 -97.3300 251.000 30.0 88.686 2.210 -999.990 -999.990 0.887 ..P WKT 2010 06 21 18 34 55 31.3200 -97.3300 251.000 122.0 93.584 3.770 -999.990 -999.990 0.936 ..P WKT 2010 06 21 18 39 55 31.3200 -97.3300 251.000 457.0 88.020 2.630 -999.990 -999.990 0.880 ..P WKT 2010 06 21 18 49 55 31.3200 -97.3300 251.000 30.0 85.083 2.920 -999.990 -999.990 0.851 ..P WKT 2010 06 21 18 54 55 31.3200 -97.3300 251.000 122.0 102.359 3.340 -999.990 -999.990 1.024 ..P WKT 2010 06 21 18 59 55 31.3200 -97.3300 251.000 457.0 89.222 2.750 -999.990 -999.990 0.892 ..P WKT 2010 06 21 19 04 55 31.3200 -97.3300 251.000 30.0 87.385 3.180 -999.990 -999.990 0.874 ..P WKT 2010 06 21 19 09 55 31.3200 -97.3300 251.000 122.0 98.523 3.280 -999.990 -999.990 0.985 ..P WKT 2010 06 21 19 14 55 31.3200 -97.3300 251.000 457.0 94.035 3.370 -999.990 -999.990 0.940 ..P WKT 2010 06 21 19 24 55 31.3200 -97.3300 251.000 30.0 92.074 2.700 -999.990 -999.990 0.921 ..P WKT 2010 06 21 19 29 55 31.3200 -97.3300 251.000 122.0 99.348 3.110 -999.990 -999.990 0.993 ..P WKT 2010 06 21 19 34 55 31.3200 -97.3300 251.000 457.0 94.619 2.860 -999.990 -999.990 0.946 ..P WKT 2010 06 21 19 39 55 31.3200 -97.3300 251.000 30.0 92.961 3.100 -999.990 -999.990 0.930 ..P WKT 2010 06 21 19 44 55 31.3200 -97.3300 251.000 122.0 93.257 2.800 -999.990 -999.990 0.933 ..P WKT 2010 06 21 19 49 55 31.3200 -97.3300 251.000 457.0 87.969 3.360 -999.990 -999.990 0.880 ..P WKT 2010 06 21 19 59 55 31.3200 -97.3300 251.000 30.0 91.133 2.440 -999.990 -999.990 0.911 ..P WKT 2010 06 21 20 04 55 31.3200 -97.3300 251.000 122.0 97.490 2.490 -999.990 -999.990 0.975 ..P WKT 2010 06 21 20 09 55 31.3200 -97.3300 251.000 457.0 86.539 2.530 -999.990 -999.990 0.865 ..P WKT 2010 06 21 20 14 55 31.3200 -97.3300 251.000 30.0 87.871 2.510 -999.990 -999.990 0.879 ..P WKT 2010 06 21 20 19 55 31.3200 -97.3300 251.000 122.0 92.973 2.170 -999.990 -999.990 0.930 ..P WKT 2010 06 21 20 24 55 31.3200 -97.3300 251.000 457.0 79.368 3.250 -999.990 -999.990 0.794 ..P WKT 2010 06 21 20 34 55 31.3200 -97.3300 251.000 30.0 84.885 2.140 -999.990 -999.990 0.849 ..P WKT 2010 06 21 20 39 55 31.3200 -97.3300 251.000 122.0 93.678 4.570 -999.990 -999.990 0.937 ..P WKT 2010 06 21 20 44 55 31.3200 -97.3300 251.000 457.0 89.067 3.080 -999.990 -999.990 0.891 ..P WKT 2010 06 21 20 49 55 31.3200 -97.3300 251.000 30.0 86.689 3.320 -999.990 -999.990 0.867 ..P WKT 2010 06 21 20 54 55 31.3200 -97.3300 251.000 122.0 96.321 2.220 -999.990 -999.990 0.963 ..P WKT 2010 06 21 20 59 55 31.3200 -97.3300 251.000 457.0 84.447 2.610 -999.990 -999.990 0.844 ..P WKT 2010 06 21 21 09 55 31.3200 -97.3300 251.000 30.0 92.041 2.590 -999.990 -999.990 0.920 ..P WKT 2010 06 21 21 14 55 31.3200 -97.3300 251.000 122.0 99.221 1.560 -999.990 -999.990 0.992 ..P WKT 2010 06 21 21 19 55 31.3200 -97.3300 251.000 457.0 91.595 3.480 -999.990 -999.990 0.916 ..P WKT 2010 06 21 21 24 55 31.3200 -97.3300 251.000 30.0 99.333 4.390 -999.990 -999.990 0.993 ..P WKT 2010 06 21 21 29 55 31.3200 -97.3300 251.000 122.0 102.044 2.940 -999.990 -999.990 1.020 ..P WKT 2010 06 21 21 34 55 31.3200 -97.3300 251.000 457.0 93.859 2.050 -999.990 -999.990 0.939 ..P WKT 2010 06 21 21 44 55 31.3200 -97.3300 251.000 30.0 102.733 3.380 -999.990 -999.990 1.027 ..P WKT 2010 06 21 21 49 55 31.3200 -97.3300 251.000 122.0 103.868 2.780 -999.990 -999.990 1.039 ..P WKT 2010 06 21 21 54 55 31.3200 -97.3300 251.000 457.0 91.591 3.130 -999.990 -999.990 0.916 ..P WKT 2010 06 21 21 59 55 31.3200 -97.3300 251.000 30.0 98.593 3.480 -999.990 -999.990 0.986 ..P WKT 2010 06 21 22 04 55 31.3200 -97.3300 251.000 122.0 101.684 3.010 -999.990 -999.990 1.017 ..P WKT 2010 06 21 22 09 55 31.3200 -97.3300 251.000 457.0 91.361 2.380 -999.990 -999.990 0.914 ..P WKT 2010 06 21 22 19 55 31.3200 -97.3300 251.000 30.0 94.947 2.860 -999.990 -999.990 0.949 ..P WKT 2010 06 21 22 24 55 31.3200 -97.3300 251.000 122.0 106.202 3.990 -999.990 -999.990 1.062 ..P WKT 2010 06 21 22 29 55 31.3200 -97.3300 251.000 457.0 97.615 3.410 -999.990 -999.990 0.976 ..P WKT 2010 06 21 22 34 55 31.3200 -97.3300 251.000 30.0 100.067 3.770 -999.990 -999.990 1.001 ..P WKT 2010 06 21 22 39 55 31.3200 -97.3300 251.000 122.0 117.053 4.780 -999.990 -999.990 1.171 ..P WKT 2010 06 21 22 44 55 31.3200 -97.3300 251.000 457.0 111.401 5.410 -999.990 -999.990 1.114 ..P WKT 2010 06 21 22 54 55 31.3200 -97.3300 251.000 30.0 105.825 5.190 -999.990 -999.990 1.058 ..P WKT 2010 06 21 22 59 55 31.3200 -97.3300 251.000 122.0 115.825 4.510 -999.990 -999.990 1.158 ..P WKT 2010 06 21 23 04 55 31.3200 -97.3300 251.000 457.0 107.656 4.080 -999.990 -999.990 1.077 ..P WKT 2010 06 21 23 09 55 31.3200 -97.3300 251.000 30.0 109.411 3.600 -999.990 -999.990 1.094 ..P WKT 2010 06 21 23 14 55 31.3200 -97.3300 251.000 122.0 112.843 3.050 -999.990 -999.990 1.128 ..P WKT 2010 06 21 23 19 55 31.3200 -97.3300 251.000 457.0 108.586 2.650 -999.990 -999.990 1.086 ..P WKT 2010 06 21 23 29 55 31.3200 -97.3300 251.000 30.0 96.305 3.210 -999.990 -999.990 0.963 ..P WKT 2010 06 21 23 34 55 31.3200 -97.3300 251.000 122.0 104.778 2.850 -999.990 -999.990 1.048 ..P WKT 2010 06 21 23 39 55 31.3200 -97.3300 251.000 457.0 99.689 2.760 -999.990 -999.990 0.997 ..P WKT 2010 06 21 23 44 55 31.3200 -97.3300 251.000 30.0 104.247 4.270 -999.990 -999.990 1.042 ..P WKT 2010 06 21 23 49 55 31.3200 -97.3300 251.000 122.0 107.408 4.300 -999.990 -999.990 1.074 ..P WKT 2010 06 22 00 09 55 31.3200 -97.3300 251.000 457.0 108.273 6.070 -999.990 -999.990 1.083 ..P WKT 2010 06 22 00 10 25 31.3200 -97.3300 251.000 457.0 105.345 5.760 -999.990 -999.990 1.053 ..P WKT 2010 06 22 00 10 55 31.3200 -97.3300 251.000 457.0 98.781 3.660 -999.990 -999.990 0.988 ..P WKT 2010 06 22 00 11 25 31.3200 -97.3300 251.000 457.0 101.445 4.820 -999.990 -999.990 1.014 ..P WKT 2010 06 22 00 11 55 31.3200 -97.3300 251.000 457.0 105.507 4.190 -999.990 -999.990 1.055 ..P WKT 2010 06 22 00 12 25 31.3200 -97.3300 251.000 457.0 98.943 4.480 -999.990 -999.990 0.989 ..P WKT 2010 06 22 00 12 55 31.3200 -97.3300 251.000 457.0 95.735 3.920 -999.990 -999.990 0.957 ..P WKT 2010 06 22 00 13 25 31.3200 -97.3300 251.000 457.0 103.433 4.270 -999.990 -999.990 1.034 ..P WKT 2010 06 22 00 13 55 31.3200 -97.3300 251.000 457.0 101.343 3.910 -999.990 -999.990 1.013 ..P WKT 2010 06 22 00 14 25 31.3200 -97.3300 251.000 457.0 103.727 3.780 -999.990 -999.990 1.037 ..P WKT 2010 06 22 00 14 55 31.3200 -97.3300 251.000 457.0 103.036 3.770 -999.990 -999.990 1.030 ..P WKT 2010 06 22 00 19 55 31.3200 -97.3300 251.000 30.0 98.358 3.950 -999.990 -999.990 0.984 ..P WKT 2010 06 22 00 24 55 31.3200 -97.3300 251.000 122.0 101.509 5.310 -999.990 -999.990 1.015 ..P WKT 2010 06 22 00 29 55 31.3200 -97.3300 251.000 457.0 96.553 5.040 -999.990 -999.990 0.966 ..P WKT 2010 06 22 00 34 55 31.3200 -97.3300 251.000 30.0 95.511 4.670 -999.990 -999.990 0.955 ..P WKT 2010 06 22 00 39 55 31.3200 -97.3300 251.000 122.0 104.811 3.620 -999.990 -999.990 1.048 ..P WKT 2010 06 22 00 44 55 31.3200 -97.3300 251.000 457.0 95.662 2.910 -999.990 -999.990 0.957 ..P WKT 2010 06 22 00 54 55 31.3200 -97.3300 251.000 30.0 94.204 3.320 -999.990 -999.990 0.942 ..P WKT 2010 06 22 00 59 55 31.3200 -97.3300 251.000 122.0 104.966 4.680 -999.990 -999.990 1.050 ..P WKT 2010 06 22 01 04 55 31.3200 -97.3300 251.000 457.0 95.887 5.380 -999.990 -999.990 0.959 ..P WKT 2010 06 22 01 09 55 31.3200 -97.3300 251.000 30.0 103.852 4.090 -999.990 -999.990 1.039 ..P WKT 2010 06 22 01 14 55 31.3200 -97.3300 251.000 122.0 101.480 4.030 -999.990 -999.990 1.015 ..P WKT 2010 06 22 01 19 55 31.3200 -97.3300 251.000 457.0 106.091 2.550 -999.990 -999.990 1.061 ..P WKT 2010 06 22 01 29 55 31.3200 -97.3300 251.000 30.0 113.716 2.250 -999.990 -999.990 1.137 ..P WKT 2010 06 22 01 34 55 31.3200 -97.3300 251.000 122.0 115.334 2.800 -999.990 -999.990 1.153 ..P WKT 2010 06 22 01 39 55 31.3200 -97.3300 251.000 457.0 108.852 3.490 -999.990 -999.990 1.089 ..P WKT 2010 06 22 01 44 55 31.3200 -97.3300 251.000 30.0 110.330 3.160 -999.990 -999.990 1.103 ..P WKT 2010 06 22 01 49 55 31.3200 -97.3300 251.000 122.0 115.716 3.320 -999.990 -999.990 1.157 ..P WKT 2010 06 22 01 54 55 31.3200 -97.3300 251.000 457.0 102.815 3.000 -999.990 -999.990 1.028 ..P WKT 2010 06 22 02 04 55 31.3200 -97.3300 251.000 30.0 105.751 3.230 -999.990 -999.990 1.058 ..P WKT 2010 06 22 02 09 55 31.3200 -97.3300 251.000 122.0 102.602 2.600 -999.990 -999.990 1.026 ..P WKT 2010 06 22 02 14 55 31.3200 -97.3300 251.000 457.0 98.338 4.130 -999.990 -999.990 0.983 ..P WKT 2010 06 22 02 19 55 31.3200 -97.3300 251.000 30.0 110.680 3.790 -999.990 -999.990 1.107 ..P WKT 2010 06 22 02 24 55 31.3200 -97.3300 251.000 122.0 104.742 4.170 -999.990 -999.990 1.047 ..P WKT 2010 06 22 02 29 55 31.3200 -97.3300 251.000 457.0 98.106 3.020 -999.990 -999.990 0.981 ..P WKT 2010 06 22 02 39 55 31.3200 -97.3300 251.000 30.0 102.117 3.570 -999.990 -999.990 1.021 ..P WKT 2010 06 22 02 44 55 31.3200 -97.3300 251.000 122.0 101.043 4.410 -999.990 -999.990 1.010 ..P WKT 2010 06 22 02 49 55 31.3200 -97.3300 251.000 457.0 98.993 4.540 -999.990 -999.990 0.990 ..P WKT 2010 06 22 02 54 55 31.3200 -97.3300 251.000 30.0 110.193 4.630 -999.990 -999.990 1.102 ..P WKT 2010 06 22 02 59 55 31.3200 -97.3300 251.000 122.0 107.446 4.630 -999.990 -999.990 1.074 ..P WKT 2010 06 22 03 04 55 31.3200 -97.3300 251.000 457.0 99.818 3.680 -999.990 -999.990 0.998 ..P WKT 2010 06 22 03 14 55 31.3200 -97.3300 251.000 30.0 106.654 3.480 -999.990 -999.990 1.067 ..P WKT 2010 06 22 03 19 55 31.3200 -97.3300 251.000 122.0 107.454 4.580 -999.990 -999.990 1.075 ..P WKT 2010 06 22 03 24 55 31.3200 -97.3300 251.000 457.0 98.075 4.840 -999.990 -999.990 0.981 ..P WKT 2010 06 22 03 29 55 31.3200 -97.3300 251.000 30.0 106.402 4.100 -999.990 -999.990 1.064 ..P WKT 2010 06 22 03 34 55 31.3200 -97.3300 251.000 122.0 99.116 2.740 -999.990 -999.990 0.991 ..P WKT 2010 06 22 03 39 55 31.3200 -97.3300 251.000 457.0 95.734 2.510 -999.990 -999.990 0.957 ..P WKT 2010 06 22 03 49 55 31.3200 -97.3300 251.000 30.0 101.214 2.540 -999.990 -999.990 1.012 ..P WKT 2010 06 22 03 54 55 31.3200 -97.3300 251.000 122.0 96.140 2.660 -999.990 -999.990 0.961 ..P WKT 2010 06 22 03 59 55 31.3200 -97.3300 251.000 457.0 91.624 2.680 -999.990 -999.990 0.916 ..P WKT 2010 06 22 04 04 55 31.3200 -97.3300 251.000 30.0 104.107 2.600 -999.990 -999.990 1.041 ..P WKT 2010 06 22 04 09 55 31.3200 -97.3300 251.000 122.0 97.362 2.440 -999.990 -999.990 0.974 ..P WKT 2010 06 22 04 14 55 31.3200 -97.3300 251.000 457.0 94.798 1.780 -999.990 -999.990 0.948 ..P WKT 2010 06 22 04 24 55 31.3200 -97.3300 251.000 30.0 104.991 2.800 -999.990 -999.990 1.050 ..P WKT 2010 06 22 04 29 55 31.3200 -97.3300 251.000 122.0 99.362 2.350 -999.990 -999.990 0.994 ..P WKT 2010 06 22 04 34 55 31.3200 -97.3300 251.000 457.0 93.457 2.310 -999.990 -999.990 0.935 ..P WKT 2010 06 22 04 39 55 31.3200 -97.3300 251.000 30.0 97.299 5.250 -999.990 -999.990 0.973 ..P WKT 2010 06 22 04 44 55 31.3200 -97.3300 251.000 122.0 101.141 1.990 -999.990 -999.990 1.011 ..P WKT 2010 06 22 04 49 55 31.3200 -97.3300 251.000 457.0 104.425 2.630 -999.990 -999.990 1.044 ..P WKT 2010 06 22 05 04 55 31.3200 -97.3300 251.000 30.0 103.253 3.700 -999.990 -999.990 1.033 ..P WKT 2010 06 22 05 09 55 31.3200 -97.3300 251.000 122.0 98.660 2.100 -999.990 -999.990 0.987 ..P WKT 2010 06 22 05 14 55 31.3200 -97.3300 251.000 457.0 93.232 3.020 -999.990 -999.990 0.932 ..P WKT 2010 06 22 05 19 55 31.3200 -97.3300 251.000 30.0 102.000 2.650 -999.990 -999.990 1.020 ..P WKT 2010 06 22 05 24 55 31.3200 -97.3300 251.000 122.0 101.860 2.320 -999.990 -999.990 1.019 ..P WKT 2010 06 22 05 29 55 31.3200 -97.3300 251.000 457.0 102.695 2.520 -999.990 -999.990 1.027 ..P WKT 2010 06 22 05 39 55 31.3200 -97.3300 251.000 30.0 115.059 2.640 -999.990 -999.990 1.151 ..P WKT 2010 06 22 05 44 55 31.3200 -97.3300 251.000 122.0 112.397 3.130 -999.990 -999.990 1.124 ..P WKT 2010 06 22 05 49 55 31.3200 -97.3300 251.000 457.0 92.904 3.550 -999.990 -999.990 0.929 ..P WKT 2010 06 22 05 54 55 31.3200 -97.3300 251.000 30.0 111.943 2.850 -999.990 -999.990 1.119 ..P WKT 2010 06 22 05 59 55 31.3200 -97.3300 251.000 122.0 110.534 2.670 -999.990 -999.990 1.105 ..P WKT 2010 06 22 06 04 55 31.3200 -97.3300 251.000 457.0 87.847 3.220 -999.990 -999.990 0.878 ..P WKT 2010 06 22 06 14 55 31.3200 -97.3300 251.000 30.0 109.327 3.120 -999.990 -999.990 1.093 ..P WKT 2010 06 22 06 19 55 31.3200 -97.3300 251.000 122.0 103.987 3.100 -999.990 -999.990 1.040 ..P WKT 2010 06 22 06 24 55 31.3200 -97.3300 251.000 457.0 89.609 3.310 -999.990 -999.990 0.896 ..P WKT 2010 06 22 06 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 06 22 06 34 55 31.3200 -97.3300 251.000 122.0 96.308 2.770 -999.990 -999.990 0.963 ..P WKT 2010 06 22 06 39 55 31.3200 -97.3300 251.000 457.0 85.687 2.600 -999.990 -999.990 0.857 ..P WKT 2010 06 22 06 49 55 31.3200 -97.3300 251.000 30.0 93.874 3.760 -999.990 -999.990 0.939 ..P WKT 2010 06 22 06 54 55 31.3200 -97.3300 251.000 122.0 106.007 3.150 -999.990 -999.990 1.060 ..P WKT 2010 06 22 06 59 55 31.3200 -97.3300 251.000 457.0 95.626 3.170 -999.990 -999.990 0.956 ..P WKT 2010 06 22 07 04 55 31.3200 -97.3300 251.000 30.0 102.616 3.620 -999.990 -999.990 1.026 ..P WKT 2010 06 22 07 09 55 31.3200 -97.3300 251.000 122.0 96.267 3.260 -999.990 -999.990 0.963 ..P WKT 2010 06 22 07 14 55 31.3200 -97.3300 251.000 457.0 86.030 3.790 -999.990 -999.990 0.860 ..P WKT 2010 06 22 07 24 55 31.3200 -97.3300 251.000 30.0 98.359 3.700 -999.990 -999.990 0.984 ..P WKT 2010 06 22 07 29 55 31.3200 -97.3300 251.000 122.0 104.671 3.670 -999.990 -999.990 1.047 ..P WKT 2010 06 22 07 34 55 31.3200 -97.3300 251.000 457.0 88.207 4.850 -999.990 -999.990 0.882 ..P WKT 2010 06 22 07 39 55 31.3200 -97.3300 251.000 30.0 99.240 3.510 -999.990 -999.990 0.992 ..P WKT 2010 06 22 07 44 55 31.3200 -97.3300 251.000 122.0 102.496 3.280 -999.990 -999.990 1.025 ..P WKT 2010 06 22 07 49 55 31.3200 -97.3300 251.000 457.0 96.865 3.230 -999.990 -999.990 0.969 ..P WKT 2010 06 22 07 59 55 31.3200 -97.3300 251.000 30.0 96.295 2.770 -999.990 -999.990 0.963 ..P WKT 2010 06 22 08 04 55 31.3200 -97.3300 251.000 122.0 99.967 2.570 -999.990 -999.990 1.000 ..P WKT 2010 06 22 08 09 55 31.3200 -97.3300 251.000 457.0 87.258 2.690 -999.990 -999.990 0.873 ..P WKT 2010 06 22 08 14 55 31.3200 -97.3300 251.000 30.0 90.653 2.950 -999.990 -999.990 0.907 ..P WKT 2010 06 22 08 19 55 31.3200 -97.3300 251.000 122.0 102.373 2.790 -999.990 -999.990 1.024 ..P WKT 2010 06 22 08 24 55 31.3200 -97.3300 251.000 457.0 89.112 2.840 -999.990 -999.990 0.891 ..P WKT 2010 06 22 08 34 55 31.3200 -97.3300 251.000 30.0 95.343 2.340 -999.990 -999.990 0.953 ..P WKT 2010 06 22 08 39 55 31.3200 -97.3300 251.000 122.0 102.620 3.410 -999.990 -999.990 1.026 ..P WKT 2010 06 22 08 44 55 31.3200 -97.3300 251.000 457.0 90.196 4.470 -999.990 -999.990 0.902 ..P WKT 2010 06 22 08 49 55 31.3200 -97.3300 251.000 30.0 101.911 2.740 -999.990 -999.990 1.019 ..P WKT 2010 06 22 08 54 55 31.3200 -97.3300 251.000 122.0 103.915 2.920 -999.990 -999.990 1.039 ..P WKT 2010 06 22 08 59 55 31.3200 -97.3300 251.000 457.0 89.829 2.480 -999.990 -999.990 0.898 ..P WKT 2010 06 22 09 09 55 31.3200 -97.3300 251.000 30.0 98.374 3.240 -999.990 -999.990 0.984 ..P WKT 2010 06 22 09 14 55 31.3200 -97.3300 251.000 122.0 98.535 2.720 -999.990 -999.990 0.985 ..P WKT 2010 06 22 09 19 55 31.3200 -97.3300 251.000 457.0 90.931 3.510 -999.990 -999.990 0.909 ..P WKT 2010 06 22 09 24 55 31.3200 -97.3300 251.000 30.0 100.244 3.410 -999.990 -999.990 1.002 ..P WKT 2010 06 22 09 29 55 31.3200 -97.3300 251.000 122.0 92.641 3.500 -999.990 -999.990 0.926 ..P WKT 2010 06 22 09 34 55 31.3200 -97.3300 251.000 457.0 91.693 3.740 -999.990 -999.990 0.917 ..P WKT 2010 06 22 09 44 55 31.3200 -97.3300 251.000 30.0 100.847 4.330 -999.990 -999.990 1.008 ..P WKT 2010 06 22 09 49 55 31.3200 -97.3300 251.000 122.0 97.643 4.010 -999.990 -999.990 0.976 ..P WKT 2010 06 22 09 54 55 31.3200 -97.3300 251.000 457.0 92.775 4.000 -999.990 -999.990 0.928 ..P WKT 2010 06 22 09 59 55 31.3200 -97.3300 251.000 30.0 99.548 3.840 -999.990 -999.990 0.995 ..P WKT 2010 06 22 10 04 55 31.3200 -97.3300 251.000 122.0 97.868 3.840 -999.990 -999.990 0.979 ..P WKT 2010 06 22 10 09 55 31.3200 -97.3300 251.000 457.0 88.707 2.770 -999.990 -999.990 0.887 ..P WKT 2010 06 22 10 19 55 31.3200 -97.3300 251.000 30.0 107.356 4.180 -999.990 -999.990 1.074 ..P WKT 2010 06 22 10 24 55 31.3200 -97.3300 251.000 122.0 107.872 3.550 -999.990 -999.990 1.079 ..P WKT 2010 06 22 10 29 55 31.3200 -97.3300 251.000 457.0 91.213 4.280 -999.990 -999.990 0.912 ..P WKT 2010 06 22 10 34 55 31.3200 -97.3300 251.000 30.0 97.271 4.590 -999.990 -999.990 0.973 ..P WKT 2010 06 22 10 39 55 31.3200 -97.3300 251.000 122.0 110.806 4.540 -999.990 -999.990 1.108 ..P WKT 2010 06 22 10 44 55 31.3200 -97.3300 251.000 457.0 85.980 3.220 -999.990 -999.990 0.860 ..P WKT 2010 06 22 10 54 55 31.3200 -97.3300 251.000 30.0 100.743 4.040 -999.990 -999.990 1.007 ..P WKT 2010 06 22 10 59 55 31.3200 -97.3300 251.000 122.0 96.295 6.230 -999.990 -999.990 0.963 ..P WKT 2010 06 22 11 04 55 31.3200 -97.3300 251.000 457.0 82.849 3.910 -999.990 -999.990 0.828 ..P WKT 2010 06 22 11 09 55 31.3200 -97.3300 251.000 30.0 100.553 4.800 -999.990 -999.990 1.006 ..P WKT 2010 06 22 11 14 55 31.3200 -97.3300 251.000 122.0 86.832 5.080 -999.990 -999.990 0.868 ..P WKT 2010 06 22 11 19 55 31.3200 -97.3300 251.000 457.0 76.712 4.900 -999.990 -999.990 0.767 ..P WKT 2010 06 22 11 29 55 31.3200 -97.3300 251.000 30.0 97.612 4.490 -999.990 -999.990 0.976 ..P WKT 2010 06 22 11 34 55 31.3200 -97.3300 251.000 122.0 95.000 4.240 -999.990 -999.990 0.950 ..P WKT 2010 06 22 11 39 55 31.3200 -97.3300 251.000 457.0 91.006 3.920 -999.990 -999.990 0.910 ..P WKT 2010 06 22 11 44 55 31.3200 -97.3300 251.000 30.0 105.551 4.680 -999.990 -999.990 1.056 ..P WKT 2010 06 22 11 49 55 31.3200 -97.3300 251.000 122.0 95.191 4.480 -999.990 -999.990 0.952 ..P WKT 2010 06 22 12 09 55 31.3200 -97.3300 251.000 457.0 92.891 2.970 -999.990 -999.990 0.929 ..P WKT 2010 06 22 12 10 25 31.3200 -97.3300 251.000 457.0 88.181 3.200 -999.990 -999.990 0.882 ..P WKT 2010 06 22 12 10 55 31.3200 -97.3300 251.000 457.0 86.793 3.050 -999.990 -999.990 0.868 ..P WKT 2010 06 22 12 11 25 31.3200 -97.3300 251.000 457.0 84.574 2.780 -999.990 -999.990 0.846 ..P WKT 2010 06 22 12 11 55 31.3200 -97.3300 251.000 457.0 86.506 3.200 -999.990 -999.990 0.865 ..P WKT 2010 06 22 12 12 25 31.3200 -97.3300 251.000 457.0 91.206 4.940 -999.990 -999.990 0.912 ..P WKT 2010 06 22 12 12 55 31.3200 -97.3300 251.000 457.0 91.478 3.060 -999.990 -999.990 0.915 ..P WKT 2010 06 22 12 13 25 31.3200 -97.3300 251.000 457.0 85.384 4.640 -999.990 -999.990 0.854 ..P WKT 2010 06 22 12 13 55 31.3200 -97.3300 251.000 457.0 86.763 3.470 -999.990 -999.990 0.868 ..P WKT 2010 06 22 12 14 25 31.3200 -97.3300 251.000 457.0 87.589 3.190 -999.990 -999.990 0.876 ..P WKT 2010 06 22 12 14 55 31.3200 -97.3300 251.000 457.0 88.414 4.190 -999.990 -999.990 0.884 ..P WKT 2010 06 22 12 19 55 31.3200 -97.3300 251.000 30.0 106.357 4.230 -999.990 -999.990 1.064 ..P WKT 2010 06 22 12 24 55 31.3200 -97.3300 251.000 122.0 95.791 5.260 -999.990 -999.990 0.958 ..P WKT 2010 06 22 12 29 55 31.3200 -97.3300 251.000 457.0 92.697 2.770 -999.990 -999.990 0.927 ..P WKT 2010 06 22 12 34 55 31.3200 -97.3300 251.000 30.0 108.434 4.020 -999.990 -999.990 1.084 ..P WKT 2010 06 22 12 39 55 31.3200 -97.3300 251.000 122.0 92.599 5.180 -999.990 -999.990 0.926 ..P WKT 2010 06 22 12 44 55 31.3200 -97.3300 251.000 457.0 87.841 2.830 -999.990 -999.990 0.878 ..P WKT 2010 06 22 12 54 55 31.3200 -97.3300 251.000 30.0 113.637 3.540 -999.990 -999.990 1.136 ..P WKT 2010 06 22 12 59 55 31.3200 -97.3300 251.000 122.0 80.728 4.640 -999.990 -999.990 0.807 ..P WKT 2010 06 22 13 04 55 31.3200 -97.3300 251.000 457.0 89.948 3.470 -999.990 -999.990 0.899 ..P WKT 2010 06 22 13 09 55 31.3200 -97.3300 251.000 30.0 93.069 3.060 -999.990 -999.990 0.931 ..P WKT 2010 06 22 13 14 55 31.3200 -97.3300 251.000 122.0 94.251 3.500 -999.990 -999.990 0.943 ..P WKT 2010 06 22 13 19 55 31.3200 -97.3300 251.000 457.0 87.113 3.200 -999.990 -999.990 0.871 ..P WKT 2010 06 22 13 29 55 31.3200 -97.3300 251.000 30.0 93.716 4.460 -999.990 -999.990 0.937 ..P WKT 2010 06 22 13 34 55 31.3200 -97.3300 251.000 122.0 95.949 4.510 -999.990 -999.990 0.959 ..P WKT 2010 06 22 13 39 55 31.3200 -97.3300 251.000 457.0 80.282 3.610 -999.990 -999.990 0.803 ..P WKT 2010 06 22 13 44 55 31.3200 -97.3300 251.000 30.0 95.560 4.050 -999.990 -999.990 0.956 ..P WKT 2010 06 22 13 49 55 31.3200 -97.3300 251.000 122.0 98.905 3.780 -999.990 -999.990 0.989 ..P WKT 2010 06 22 13 54 55 31.3200 -97.3300 251.000 457.0 82.814 5.340 -999.990 -999.990 0.828 ..P WKT 2010 06 22 14 04 55 31.3200 -97.3300 251.000 30.0 92.301 4.870 -999.990 -999.990 0.923 ..P WKT 2010 06 22 14 09 55 31.3200 -97.3300 251.000 122.0 96.361 3.630 -999.990 -999.990 0.964 ..P WKT 2010 06 22 14 14 55 31.3200 -97.3300 251.000 457.0 77.640 5.250 -999.990 -999.990 0.776 ..P WKT 2010 06 22 14 19 55 31.3200 -97.3300 251.000 30.0 95.317 3.570 -999.990 -999.990 0.953 ..P WKT 2010 06 22 14 24 55 31.3200 -97.3300 251.000 122.0 101.187 3.440 -999.990 -999.990 1.012 ..P WKT 2010 06 22 14 29 55 31.3200 -97.3300 251.000 457.0 78.566 3.110 -999.990 -999.990 0.786 ..P WKT 2010 06 22 14 39 55 31.3200 -97.3300 251.000 30.0 96.066 3.420 -999.990 -999.990 0.961 ..P WKT 2010 06 22 14 44 55 31.3200 -97.3300 251.000 122.0 98.105 3.880 -999.990 -999.990 0.981 ..P WKT 2010 06 22 14 49 55 31.3200 -97.3300 251.000 457.0 85.126 3.690 -999.990 -999.990 0.851 ..P WKT 2010 06 22 14 54 55 31.3200 -97.3300 251.000 30.0 94.119 4.580 -999.990 -999.990 0.941 ..P WKT 2010 06 22 14 59 55 31.3200 -97.3300 251.000 122.0 95.464 4.900 -999.990 -999.990 0.955 ..P WKT 2010 06 22 15 04 55 31.3200 -97.3300 251.000 457.0 90.409 3.310 -999.990 -999.990 0.904 ..P WKT 2010 06 22 15 14 55 31.3200 -97.3300 251.000 30.0 91.528 4.800 -999.990 -999.990 0.915 ..P WKT 2010 06 22 15 19 55 31.3200 -97.3300 251.000 122.0 96.453 4.410 -999.990 -999.990 0.965 ..P WKT 2010 06 22 15 24 55 31.3200 -97.3300 251.000 457.0 81.330 3.900 -999.990 -999.990 0.813 ..P WKT 2010 06 22 15 29 55 31.3200 -97.3300 251.000 30.0 89.458 4.060 -999.990 -999.990 0.895 ..P WKT 2010 06 22 15 34 55 31.3200 -97.3300 251.000 122.0 104.274 3.670 -999.990 -999.990 1.043 ..P WKT 2010 06 22 15 39 55 31.3200 -97.3300 251.000 457.0 91.513 3.540 -999.990 -999.990 0.915 ..P WKT 2010 06 22 15 49 55 31.3200 -97.3300 251.000 30.0 91.260 3.030 -999.990 -999.990 0.913 ..P WKT 2010 06 22 15 54 55 31.3200 -97.3300 251.000 122.0 101.267 3.730 -999.990 -999.990 1.013 ..P WKT 2010 06 22 15 59 55 31.3200 -97.3300 251.000 457.0 93.158 4.220 -999.990 -999.990 0.932 ..P WKT 2010 06 22 16 04 55 31.3200 -97.3300 251.000 30.0 100.381 3.430 -999.990 -999.990 1.004 ..P WKT 2010 06 22 16 09 55 31.3200 -97.3300 251.000 122.0 108.443 3.440 -999.990 -999.990 1.084 ..P WKT 2010 06 22 16 14 55 31.3200 -97.3300 251.000 457.0 96.983 4.590 -999.990 -999.990 0.970 ..P WKT 2010 06 22 16 24 55 31.3200 -97.3300 251.000 30.0 98.365 4.210 -999.990 -999.990 0.984 ..P WKT 2010 06 22 16 29 55 31.3200 -97.3300 251.000 122.0 105.356 5.740 -999.990 -999.990 1.054 ..P WKT 2010 06 22 16 34 55 31.3200 -97.3300 251.000 457.0 99.231 4.070 -999.990 -999.990 0.992 ..P WKT 2010 06 22 16 39 55 31.3200 -97.3300 251.000 30.0 98.687 4.830 -999.990 -999.990 0.987 ..P WKT 2010 06 22 16 44 55 31.3200 -97.3300 251.000 122.0 102.051 4.200 -999.990 -999.990 1.021 ..P WKT 2010 06 22 16 49 55 31.3200 -97.3300 251.000 457.0 88.103 4.690 -999.990 -999.990 0.881 ..P WKT 2010 06 22 17 04 55 31.3200 -97.3300 251.000 30.0 84.579 5.880 -999.990 -999.990 0.846 ..P WKT 2010 06 22 17 09 55 31.3200 -97.3300 251.000 122.0 105.861 5.480 -999.990 -999.990 1.059 ..P WKT 2010 06 22 17 14 55 31.3200 -97.3300 251.000 457.0 93.894 4.360 -999.990 -999.990 0.939 ..P WKT 2010 06 22 17 19 55 31.3200 -97.3300 251.000 30.0 98.135 6.130 -999.990 -999.990 0.981 ..P WKT 2010 06 22 17 24 55 31.3200 -97.3300 251.000 122.0 104.754 3.710 -999.990 -999.990 1.048 ..P WKT 2010 06 22 17 29 55 31.3200 -97.3300 251.000 457.0 96.136 3.770 -999.990 -999.990 0.961 ..P WKT 2010 06 22 17 39 55 31.3200 -97.3300 251.000 30.0 97.537 3.920 -999.990 -999.990 0.975 ..P WKT 2010 06 22 17 44 55 31.3200 -97.3300 251.000 122.0 105.324 3.390 -999.990 -999.990 1.053 ..P WKT 2010 06 22 17 49 55 31.3200 -97.3300 251.000 457.0 99.683 3.200 -999.990 -999.990 0.997 ..P WKT 2010 06 22 17 54 55 31.3200 -97.3300 251.000 30.0 99.498 3.090 -999.990 -999.990 0.995 ..P WKT 2010 06 22 17 59 55 31.3200 -97.3300 251.000 122.0 99.032 3.890 -999.990 -999.990 0.990 ..P WKT 2010 06 22 18 04 55 31.3200 -97.3300 251.000 457.0 93.529 3.210 -999.990 -999.990 0.935 ..P WKT 2010 06 22 18 14 55 31.3200 -97.3300 251.000 30.0 97.895 3.420 -999.990 -999.990 0.979 ..P WKT 2010 06 22 18 19 55 31.3200 -97.3300 251.000 122.0 104.691 3.500 -999.990 -999.990 1.047 ..P WKT 2010 06 22 18 24 55 31.3200 -97.3300 251.000 457.0 98.043 3.280 -999.990 -999.990 0.980 ..P WKT 2010 06 22 18 29 55 31.3200 -97.3300 251.000 30.0 94.475 3.260 -999.990 -999.990 0.945 ..P WKT 2010 06 22 18 34 55 31.3200 -97.3300 251.000 122.0 102.254 3.500 -999.990 -999.990 1.023 ..P WKT 2010 06 22 18 39 55 31.3200 -97.3300 251.000 457.0 93.922 4.200 -999.990 -999.990 0.939 ..P WKT 2010 06 22 18 49 55 31.3200 -97.3300 251.000 30.0 91.305 3.410 -999.990 -999.990 0.913 ..P WKT 2010 06 22 18 54 55 31.3200 -97.3300 251.000 122.0 97.446 3.300 -999.990 -999.990 0.974 ..P WKT 2010 06 22 18 59 55 31.3200 -97.3300 251.000 457.0 94.897 3.200 -999.990 -999.990 0.949 ..P WKT 2010 06 22 19 04 55 31.3200 -97.3300 251.000 30.0 96.693 5.540 -999.990 -999.990 0.967 ..P WKT 2010 06 22 19 09 55 31.3200 -97.3300 251.000 122.0 100.875 3.360 -999.990 -999.990 1.009 ..P WKT 2010 06 22 19 14 55 31.3200 -97.3300 251.000 457.0 96.080 3.300 -999.990 -999.990 0.961 ..P WKT 2010 06 22 19 24 55 31.3200 -97.3300 251.000 30.0 96.106 3.010 -999.990 -999.990 0.961 ..P WKT 2010 06 22 19 29 55 31.3200 -97.3300 251.000 122.0 102.055 3.340 -999.990 -999.990 1.021 ..P WKT 2010 06 22 19 34 55 31.3200 -97.3300 251.000 457.0 91.161 4.420 -999.990 -999.990 0.912 ..P WKT 2010 06 22 19 39 55 31.3200 -97.3300 251.000 30.0 91.776 3.940 -999.990 -999.990 0.918 ..P WKT 2010 06 22 19 44 55 31.3200 -97.3300 251.000 122.0 102.781 3.860 -999.990 -999.990 1.028 ..P WKT 2010 06 22 19 49 55 31.3200 -97.3300 251.000 457.0 93.567 3.340 -999.990 -999.990 0.936 ..P WKT 2010 06 22 19 59 55 31.3200 -97.3300 251.000 30.0 97.327 2.930 -999.990 -999.990 0.973 ..P WKT 2010 06 22 20 04 55 31.3200 -97.3300 251.000 122.0 99.067 3.470 -999.990 -999.990 0.991 ..P WKT 2010 06 22 20 09 55 31.3200 -97.3300 251.000 457.0 92.938 3.580 -999.990 -999.990 0.929 ..P WKT 2010 06 22 20 14 55 31.3200 -97.3300 251.000 30.0 96.083 3.420 -999.990 -999.990 0.961 ..P WKT 2010 06 22 20 19 55 31.3200 -97.3300 251.000 122.0 107.102 3.390 -999.990 -999.990 1.071 ..P WKT 2010 06 22 20 24 55 31.3200 -97.3300 251.000 457.0 94.504 3.150 -999.990 -999.990 0.945 ..P WKT 2010 06 22 20 34 55 31.3200 -97.3300 251.000 30.0 108.435 4.140 -999.990 -999.990 1.084 ..P WKT 2010 06 22 20 39 55 31.3200 -97.3300 251.000 122.0 112.188 3.550 -999.990 -999.990 1.122 ..P WKT 2010 06 22 20 44 55 31.3200 -97.3300 251.000 457.0 104.125 3.320 -999.990 -999.990 1.041 ..P WKT 2010 06 22 20 49 55 31.3200 -97.3300 251.000 30.0 106.753 3.310 -999.990 -999.990 1.068 ..P WKT 2010 06 22 20 54 55 31.3200 -97.3300 251.000 122.0 115.012 3.760 -999.990 -999.990 1.150 ..P WKT 2010 06 22 20 59 55 31.3200 -97.3300 251.000 457.0 103.286 3.490 -999.990 -999.990 1.033 ..P WKT 2010 06 22 21 09 55 31.3200 -97.3300 251.000 30.0 107.982 3.730 -999.990 -999.990 1.080 ..P WKT 2010 06 22 21 14 55 31.3200 -97.3300 251.000 122.0 104.980 3.810 -999.990 -999.990 1.050 ..P WKT 2010 06 22 21 19 55 31.3200 -97.3300 251.000 457.0 95.639 4.520 -999.990 -999.990 0.956 ..P WKT 2010 06 22 21 24 55 31.3200 -97.3300 251.000 30.0 103.481 4.450 -999.990 -999.990 1.035 ..P WKT 2010 06 22 21 29 55 31.3200 -97.3300 251.000 122.0 107.381 4.910 -999.990 -999.990 1.074 ..P WKT 2010 06 22 21 34 55 31.3200 -97.3300 251.000 457.0 105.645 4.850 -999.990 -999.990 1.056 ..P WKT 2010 06 22 21 44 55 31.3200 -97.3300 251.000 30.0 98.709 5.270 -999.990 -999.990 0.987 ..P WKT 2010 06 22 21 49 55 31.3200 -97.3300 251.000 122.0 108.310 5.510 -999.990 -999.990 1.083 ..P WKT 2010 06 22 21 54 55 31.3200 -97.3300 251.000 457.0 101.698 4.070 -999.990 -999.990 1.017 ..P WKT 2010 06 22 21 59 55 31.3200 -97.3300 251.000 30.0 105.098 3.820 -999.990 -999.990 1.051 ..P WKT 2010 06 22 22 04 55 31.3200 -97.3300 251.000 122.0 110.050 3.560 -999.990 -999.990 1.101 ..P WKT 2010 06 22 22 09 55 31.3200 -97.3300 251.000 457.0 100.614 3.430 -999.990 -999.990 1.006 ..P WKT 2010 06 22 22 19 55 31.3200 -97.3300 251.000 30.0 99.755 3.900 -999.990 -999.990 0.998 ..P WKT 2010 06 22 22 24 55 31.3200 -97.3300 251.000 122.0 100.153 3.900 -999.990 -999.990 1.002 ..P WKT 2010 06 22 22 29 55 31.3200 -97.3300 251.000 457.0 95.468 3.930 -999.990 -999.990 0.955 ..P WKT 2010 06 22 22 34 55 31.3200 -97.3300 251.000 30.0 97.277 4.640 -999.990 -999.990 0.973 ..P WKT 2010 06 22 22 39 55 31.3200 -97.3300 251.000 122.0 108.689 4.520 -999.990 -999.990 1.087 ..P WKT 2010 06 22 22 44 55 31.3200 -97.3300 251.000 457.0 96.801 5.140 -999.990 -999.990 0.968 ..P WKT 2010 06 22 22 54 55 31.3200 -97.3300 251.000 30.0 104.782 4.660 -999.990 -999.990 1.048 ..P WKT 2010 06 22 22 59 55 31.3200 -97.3300 251.000 122.0 108.834 4.190 -999.990 -999.990 1.088 ..P WKT 2010 06 22 23 04 55 31.3200 -97.3300 251.000 457.0 97.341 3.770 -999.990 -999.990 0.973 ..P WKT 2010 06 22 23 09 55 31.3200 -97.3300 251.000 30.0 103.514 4.570 -999.990 -999.990 1.035 ..P WKT 2010 06 22 23 14 55 31.3200 -97.3300 251.000 122.0 110.679 4.300 -999.990 -999.990 1.107 ..P WKT 2010 06 22 23 19 55 31.3200 -97.3300 251.000 457.0 105.544 3.570 -999.990 -999.990 1.055 ..P WKT 2010 06 22 23 29 55 31.3200 -97.3300 251.000 30.0 102.863 3.530 -999.990 -999.990 1.029 ..P WKT 2010 06 22 23 34 55 31.3200 -97.3300 251.000 122.0 110.977 3.540 -999.990 -999.990 1.110 ..P WKT 2010 06 22 23 39 55 31.3200 -97.3300 251.000 457.0 113.151 3.820 -999.990 -999.990 1.132 ..P WKT 2010 06 22 23 44 55 31.3200 -97.3300 251.000 30.0 107.400 3.630 -999.990 -999.990 1.074 ..P WKT 2010 06 22 23 49 55 31.3200 -97.3300 251.000 122.0 113.538 2.970 -999.990 -999.990 1.135 ..P WKT 2010 06 23 00 09 55 31.3200 -97.3300 251.000 457.0 112.245 3.440 -999.990 -999.990 1.122 ..P WKT 2010 06 23 00 10 25 31.3200 -97.3300 251.000 457.0 111.948 3.240 -999.990 -999.990 1.119 ..P WKT 2010 06 23 00 10 55 31.3200 -97.3300 251.000 457.0 112.784 3.910 -999.990 -999.990 1.128 ..P WKT 2010 06 23 00 11 25 31.3200 -97.3300 251.000 457.0 112.770 4.320 -999.990 -999.990 1.128 ..P WKT 2010 06 23 00 11 55 31.3200 -97.3300 251.000 457.0 109.642 3.280 -999.990 -999.990 1.096 ..P WKT 2010 06 23 00 12 25 31.3200 -97.3300 251.000 457.0 111.044 4.310 -999.990 -999.990 1.110 ..P WKT 2010 06 23 00 12 55 31.3200 -97.3300 251.000 457.0 112.729 3.380 -999.990 -999.990 1.127 ..P WKT 2010 06 23 00 13 25 31.3200 -97.3300 251.000 457.0 114.697 3.290 -999.990 -999.990 1.147 ..P WKT 2010 06 23 00 13 55 31.3200 -97.3300 251.000 457.0 113.551 3.380 -999.990 -999.990 1.136 ..P WKT 2010 06 23 00 14 25 31.3200 -97.3300 251.000 457.0 118.350 4.160 -999.990 -999.990 1.183 ..P WKT 2010 06 23 00 14 55 31.3200 -97.3300 251.000 457.0 113.524 4.260 -999.990 -999.990 1.135 ..P WKT 2010 06 23 00 19 55 31.3200 -97.3300 251.000 30.0 114.518 4.050 -999.990 -999.990 1.145 ..P WKT 2010 06 23 00 24 55 31.3200 -97.3300 251.000 122.0 113.532 3.460 -999.990 -999.990 1.135 ..P WKT 2010 06 23 00 29 55 31.3200 -97.3300 251.000 457.0 109.431 3.310 -999.990 -999.990 1.094 ..P WKT 2010 06 23 00 34 55 31.3200 -97.3300 251.000 30.0 116.371 3.240 -999.990 -999.990 1.164 ..P WKT 2010 06 23 00 39 55 31.3200 -97.3300 251.000 122.0 121.045 3.790 -999.990 -999.990 1.210 ..P WKT 2010 06 23 00 44 55 31.3200 -97.3300 251.000 457.0 116.379 3.110 -999.990 -999.990 1.164 ..P WKT 2010 06 23 00 54 55 31.3200 -97.3300 251.000 30.0 109.237 3.970 -999.990 -999.990 1.092 ..P WKT 2010 06 23 00 59 55 31.3200 -97.3300 251.000 122.0 111.287 3.420 -999.990 -999.990 1.113 ..P WKT 2010 06 23 01 04 55 31.3200 -97.3300 251.000 457.0 110.508 3.610 -999.990 -999.990 1.105 ..P WKT 2010 06 23 01 09 55 31.3200 -97.3300 251.000 30.0 110.294 3.410 -999.990 -999.990 1.103 ..P WKT 2010 06 23 01 14 55 31.3200 -97.3300 251.000 122.0 113.758 3.280 -999.990 -999.990 1.138 ..P WKT 2010 06 23 01 19 55 31.3200 -97.3300 251.000 457.0 104.634 3.430 -999.990 -999.990 1.046 ..P WKT 2010 06 23 01 29 55 31.3200 -97.3300 251.000 30.0 119.724 4.580 -999.990 -999.990 1.197 ..P WKT 2010 06 23 01 34 55 31.3200 -97.3300 251.000 122.0 115.370 3.270 -999.990 -999.990 1.154 ..P WKT 2010 06 23 01 39 55 31.3200 -97.3300 251.000 457.0 114.691 3.570 -999.990 -999.990 1.147 ..P WKT 2010 06 23 01 44 55 31.3200 -97.3300 251.000 30.0 121.648 3.550 -999.990 -999.990 1.216 ..P WKT 2010 06 23 01 49 55 31.3200 -97.3300 251.000 122.0 118.566 3.800 -999.990 -999.990 1.186 ..P WKT 2010 06 23 01 54 55 31.3200 -97.3300 251.000 457.0 108.700 3.320 -999.990 -999.990 1.087 ..P WKT 2010 06 23 02 04 55 31.3200 -97.3300 251.000 30.0 122.974 4.060 -999.990 -999.990 1.230 ..P WKT 2010 06 23 02 09 55 31.3200 -97.3300 251.000 122.0 114.319 5.160 -999.990 -999.990 1.143 ..P WKT 2010 06 23 02 14 55 31.3200 -97.3300 251.000 457.0 107.646 3.790 -999.990 -999.990 1.076 ..P WKT 2010 06 23 02 19 55 31.3200 -97.3300 251.000 30.0 115.528 3.830 -999.990 -999.990 1.155 ..P WKT 2010 06 23 02 24 55 31.3200 -97.3300 251.000 122.0 111.398 3.730 -999.990 -999.990 1.114 ..P WKT 2010 06 23 02 29 55 31.3200 -97.3300 251.000 457.0 104.867 3.690 -999.990 -999.990 1.049 ..P WKT 2010 06 23 02 39 55 31.3200 -97.3300 251.000 30.0 115.664 4.720 -999.990 -999.990 1.157 ..P WKT 2010 06 23 02 44 55 31.3200 -97.3300 251.000 122.0 114.764 4.350 -999.990 -999.990 1.148 ..P WKT 2010 06 23 02 49 55 31.3200 -97.3300 251.000 457.0 101.434 3.460 -999.990 -999.990 1.014 ..P WKT 2010 06 23 02 54 55 31.3200 -97.3300 251.000 30.0 115.649 4.290 -999.990 -999.990 1.156 ..P WKT 2010 06 23 02 59 55 31.3200 -97.3300 251.000 122.0 104.298 3.530 -999.990 -999.990 1.043 ..P WKT 2010 06 23 03 04 55 31.3200 -97.3300 251.000 457.0 108.060 3.350 -999.990 -999.990 1.081 ..P WKT 2010 06 23 03 14 55 31.3200 -97.3300 251.000 30.0 107.796 3.180 -999.990 -999.990 1.078 ..P WKT 2010 06 23 03 19 55 31.3200 -97.3300 251.000 122.0 108.995 3.410 -999.990 -999.990 1.090 ..P WKT 2010 06 23 03 24 55 31.3200 -97.3300 251.000 457.0 105.676 3.320 -999.990 -999.990 1.057 ..P WKT 2010 06 23 03 29 55 31.3200 -97.3300 251.000 30.0 106.028 4.000 -999.990 -999.990 1.060 ..P WKT 2010 06 23 03 34 55 31.3200 -97.3300 251.000 122.0 112.028 4.060 -999.990 -999.990 1.120 ..P WKT 2010 06 23 03 39 55 31.3200 -97.3300 251.000 457.0 97.416 4.130 -999.990 -999.990 0.974 ..P WKT 2010 06 23 03 49 55 31.3200 -97.3300 251.000 30.0 108.969 4.090 -999.990 -999.990 1.090 ..P WKT 2010 06 23 03 54 55 31.3200 -97.3300 251.000 122.0 113.111 3.930 -999.990 -999.990 1.131 ..P WKT 2010 06 23 03 59 55 31.3200 -97.3300 251.000 457.0 106.528 3.990 -999.990 -999.990 1.065 ..P WKT 2010 06 23 04 04 55 31.3200 -97.3300 251.000 30.0 112.363 3.900 -999.990 -999.990 1.124 ..P WKT 2010 06 23 04 09 55 31.3200 -97.3300 251.000 122.0 113.118 4.270 -999.990 -999.990 1.131 ..P WKT 2010 06 23 04 14 55 31.3200 -97.3300 251.000 457.0 105.970 3.600 -999.990 -999.990 1.060 ..P WKT 2010 06 23 04 24 55 31.3200 -97.3300 251.000 30.0 102.805 4.240 -999.990 -999.990 1.028 ..P WKT 2010 06 23 04 29 55 31.3200 -97.3300 251.000 122.0 117.223 3.630 -999.990 -999.990 1.172 ..P WKT 2010 06 23 04 34 55 31.3200 -97.3300 251.000 457.0 105.685 3.730 -999.990 -999.990 1.057 ..P WKT 2010 06 23 04 39 55 31.3200 -97.3300 251.000 30.0 107.689 4.330 -999.990 -999.990 1.077 ..P WKT 2010 06 23 04 44 55 31.3200 -97.3300 251.000 122.0 109.410 4.200 -999.990 -999.990 1.094 ..P WKT 2010 06 23 04 49 55 31.3200 -97.3300 251.000 457.0 110.004 4.050 -999.990 -999.990 1.100 ..P WKT 2010 06 23 05 04 55 31.3200 -97.3300 251.000 30.0 110.857 4.640 -999.990 -999.990 1.109 ..P WKT 2010 06 23 05 09 55 31.3200 -97.3300 251.000 122.0 116.908 4.390 -999.990 -999.990 1.169 ..P WKT 2010 06 23 05 14 55 31.3200 -97.3300 251.000 457.0 118.729 4.150 -999.990 -999.990 1.187 ..P WKT 2010 06 23 05 19 55 31.3200 -97.3300 251.000 30.0 115.193 3.950 -999.990 -999.990 1.152 ..P WKT 2010 06 23 05 24 55 31.3200 -97.3300 251.000 122.0 119.551 3.670 -999.990 -999.990 1.196 ..P WKT 2010 06 23 05 29 55 31.3200 -97.3300 251.000 457.0 104.035 3.710 -999.990 -999.990 1.040 ..P WKT 2010 06 23 05 39 55 31.3200 -97.3300 251.000 30.0 116.395 4.850 -999.990 -999.990 1.164 ..P WKT 2010 06 23 05 44 55 31.3200 -97.3300 251.000 122.0 115.659 3.890 -999.990 -999.990 1.157 ..P WKT 2010 06 23 05 49 55 31.3200 -97.3300 251.000 457.0 98.295 4.140 -999.990 -999.990 0.983 ..P WKT 2010 06 23 05 54 55 31.3200 -97.3300 251.000 30.0 112.919 4.040 -999.990 -999.990 1.129 ..P WKT 2010 06 23 05 59 55 31.3200 -97.3300 251.000 122.0 106.407 3.400 -999.990 -999.990 1.064 ..P WKT 2010 06 23 06 04 55 31.3200 -97.3300 251.000 457.0 98.204 3.340 -999.990 -999.990 0.982 ..P WKT 2010 06 23 06 14 55 31.3200 -97.3300 251.000 30.0 104.402 3.870 -999.990 -999.990 1.044 ..P WKT 2010 06 23 06 19 55 31.3200 -97.3300 251.000 122.0 102.459 3.230 -999.990 -999.990 1.025 ..P WKT 2010 06 23 06 24 55 31.3200 -97.3300 251.000 457.0 97.137 3.270 -999.990 -999.990 0.971 ..P WKT 2010 06 23 06 29 55 31.3200 -97.3300 251.000 30.0 99.983 3.820 -999.990 -999.990 1.000 ..P WKT 2010 06 23 06 34 55 31.3200 -97.3300 251.000 122.0 108.040 3.400 -999.990 -999.990 1.080 ..P WKT 2010 06 23 06 39 55 31.3200 -97.3300 251.000 457.0 93.285 4.170 -999.990 -999.990 0.933 ..P WKT 2010 06 23 06 49 55 31.3200 -97.3300 251.000 30.0 103.382 3.170 -999.990 -999.990 1.034 ..P WKT 2010 06 23 06 54 55 31.3200 -97.3300 251.000 122.0 99.932 3.680 -999.990 -999.990 0.999 ..P WKT 2010 06 23 06 59 55 31.3200 -97.3300 251.000 457.0 91.697 3.560 -999.990 -999.990 0.917 ..P WKT 2010 06 23 07 04 55 31.3200 -97.3300 251.000 30.0 93.174 4.570 -999.990 -999.990 0.932 ..P WKT 2010 06 23 07 09 55 31.3200 -97.3300 251.000 122.0 97.749 3.570 -999.990 -999.990 0.977 ..P WKT 2010 06 23 07 14 55 31.3200 -97.3300 251.000 457.0 90.782 4.140 -999.990 -999.990 0.908 ..P WKT 2010 06 23 07 24 55 31.3200 -97.3300 251.000 30.0 95.105 4.130 -999.990 -999.990 0.951 ..P WKT 2010 06 23 07 29 55 31.3200 -97.3300 251.000 122.0 98.230 4.510 -999.990 -999.990 0.982 ..P WKT 2010 06 23 07 34 55 31.3200 -97.3300 251.000 457.0 94.884 3.560 -999.990 -999.990 0.949 ..P WKT 2010 06 23 07 39 55 31.3200 -97.3300 251.000 30.0 90.693 4.040 -999.990 -999.990 0.907 ..P WKT 2010 06 23 07 44 55 31.3200 -97.3300 251.000 122.0 97.758 4.470 -999.990 -999.990 0.978 ..P WKT 2010 06 23 07 49 55 31.3200 -97.3300 251.000 457.0 89.628 3.660 -999.990 -999.990 0.896 ..P WKT 2010 06 23 07 59 55 31.3200 -97.3300 251.000 30.0 91.658 4.120 -999.990 -999.990 0.917 ..P WKT 2010 06 23 08 04 55 31.3200 -97.3300 251.000 122.0 96.470 3.260 -999.990 -999.990 0.965 ..P WKT 2010 06 23 08 09 55 31.3200 -97.3300 251.000 457.0 86.656 3.960 -999.990 -999.990 0.867 ..P WKT 2010 06 23 08 14 55 31.3200 -97.3300 251.000 30.0 88.093 5.800 -999.990 -999.990 0.881 ..P WKT 2010 06 23 08 19 55 31.3200 -97.3300 251.000 122.0 92.905 3.470 -999.990 -999.990 0.929 ..P WKT 2010 06 23 08 24 55 31.3200 -97.3300 251.000 457.0 92.091 3.330 -999.990 -999.990 0.921 ..P WKT 2010 06 23 08 34 55 31.3200 -97.3300 251.000 30.0 94.702 3.770 -999.990 -999.990 0.947 ..P WKT 2010 06 23 08 39 55 31.3200 -97.3300 251.000 122.0 102.062 4.230 -999.990 -999.990 1.021 ..P WKT 2010 06 23 08 44 55 31.3200 -97.3300 251.000 457.0 93.959 4.090 -999.990 -999.990 0.940 ..P WKT 2010 06 23 08 49 55 31.3200 -97.3300 251.000 30.0 94.572 3.780 -999.990 -999.990 0.946 ..P WKT 2010 06 23 08 54 55 31.3200 -97.3300 251.000 122.0 104.460 3.980 -999.990 -999.990 1.045 ..P WKT 2010 06 23 08 59 55 31.3200 -97.3300 251.000 457.0 94.953 3.520 -999.990 -999.990 0.950 ..P WKT 2010 06 23 09 09 55 31.3200 -97.3300 251.000 30.0 88.790 3.610 -999.990 -999.990 0.888 ..P WKT 2010 06 23 09 14 55 31.3200 -97.3300 251.000 122.0 105.902 4.750 -999.990 -999.990 1.059 ..P WKT 2010 06 23 09 19 55 31.3200 -97.3300 251.000 457.0 89.996 4.260 -999.990 -999.990 0.900 ..P WKT 2010 06 23 09 24 55 31.3200 -97.3300 251.000 30.0 92.073 3.850 -999.990 -999.990 0.921 ..P WKT 2010 06 23 09 29 55 31.3200 -97.3300 251.000 122.0 101.456 3.670 -999.990 -999.990 1.015 ..P WKT 2010 06 23 09 34 55 31.3200 -97.3300 251.000 457.0 91.451 5.110 -999.990 -999.990 0.915 ..P WKT 2010 06 23 09 44 55 31.3200 -97.3300 251.000 30.0 97.612 3.790 -999.990 -999.990 0.976 ..P WKT 2010 06 23 09 49 55 31.3200 -97.3300 251.000 122.0 103.801 3.430 -999.990 -999.990 1.038 ..P WKT 2010 06 23 09 54 55 31.3200 -97.3300 251.000 457.0 94.542 3.790 -999.990 -999.990 0.945 ..P WKT 2010 06 23 09 59 55 31.3200 -97.3300 251.000 30.0 94.271 4.590 -999.990 -999.990 0.943 ..P WKT 2010 06 23 10 04 55 31.3200 -97.3300 251.000 122.0 97.510 4.120 -999.990 -999.990 0.975 ..P WKT 2010 06 23 10 09 55 31.3200 -97.3300 251.000 457.0 90.640 3.400 -999.990 -999.990 0.906 ..P WKT 2010 06 23 10 19 55 31.3200 -97.3300 251.000 30.0 97.720 3.300 -999.990 -999.990 0.977 ..P WKT 2010 06 23 10 24 55 31.3200 -97.3300 251.000 122.0 94.963 3.830 -999.990 -999.990 0.950 ..P WKT 2010 06 23 10 29 55 31.3200 -97.3300 251.000 457.0 92.065 4.250 -999.990 -999.990 0.921 ..P WKT 2010 06 23 10 34 55 31.3200 -97.3300 251.000 30.0 91.133 4.250 -999.990 -999.990 0.911 ..P WKT 2010 06 23 10 39 55 31.3200 -97.3300 251.000 122.0 95.814 6.190 -999.990 -999.990 0.958 ..P WKT 2010 06 23 10 44 55 31.3200 -97.3300 251.000 457.0 95.724 3.760 -999.990 -999.990 0.957 ..P WKT 2010 06 23 10 54 55 31.3200 -97.3300 251.000 30.0 92.176 3.630 -999.990 -999.990 0.922 ..P WKT 2010 06 23 10 59 55 31.3200 -97.3300 251.000 122.0 92.227 3.990 -999.990 -999.990 0.922 ..P WKT 2010 06 23 11 04 55 31.3200 -97.3300 251.000 457.0 89.892 4.620 -999.990 -999.990 0.899 ..P WKT 2010 06 23 11 09 55 31.3200 -97.3300 251.000 30.0 93.169 4.370 -999.990 -999.990 0.932 ..P WKT 2010 06 23 11 14 55 31.3200 -97.3300 251.000 122.0 88.870 3.650 -999.990 -999.990 0.889 ..P WKT 2010 06 23 11 19 55 31.3200 -97.3300 251.000 457.0 92.428 3.250 -999.990 -999.990 0.924 ..P WKT 2010 06 23 11 29 55 31.3200 -97.3300 251.000 30.0 107.789 3.520 -999.990 -999.990 1.078 ..P WKT 2010 06 23 11 34 55 31.3200 -97.3300 251.000 122.0 95.754 3.390 -999.990 -999.990 0.958 ..P WKT 2010 06 23 11 39 55 31.3200 -97.3300 251.000 457.0 99.144 3.380 -999.990 -999.990 0.991 ..P WKT 2010 06 23 11 44 55 31.3200 -97.3300 251.000 30.0 107.020 3.780 -999.990 -999.990 1.070 ..P WKT 2010 06 23 11 49 55 31.3200 -97.3300 251.000 122.0 96.109 4.200 -999.990 -999.990 0.961 ..P WKT 2010 06 23 12 09 55 31.3200 -97.3300 251.000 457.0 91.500 4.270 -999.990 -999.990 0.915 ..P WKT 2010 06 23 12 10 25 31.3200 -97.3300 251.000 457.0 90.943 3.540 -999.990 -999.990 0.909 ..P WKT 2010 06 23 12 10 55 31.3200 -97.3300 251.000 457.0 91.787 3.600 -999.990 -999.990 0.918 ..P WKT 2010 06 23 12 11 25 31.3200 -97.3300 251.000 457.0 94.314 3.860 -999.990 -999.990 0.943 ..P WKT 2010 06 23 12 11 55 31.3200 -97.3300 251.000 457.0 93.194 3.530 -999.990 -999.990 0.932 ..P WKT 2010 06 23 12 12 25 31.3200 -97.3300 251.000 457.0 92.075 3.950 -999.990 -999.990 0.921 ..P WKT 2010 06 23 12 12 55 31.3200 -97.3300 251.000 457.0 91.797 4.250 -999.990 -999.990 0.918 ..P WKT 2010 06 23 12 13 25 31.3200 -97.3300 251.000 457.0 92.921 3.560 -999.990 -999.990 0.929 ..P WKT 2010 06 23 12 13 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 06 23 12 14 25 31.3200 -97.3300 251.000 457.0 92.647 3.890 -999.990 -999.990 0.926 ..P WKT 2010 06 23 12 14 55 31.3200 -97.3300 251.000 457.0 96.016 3.770 -999.990 -999.990 0.960 ..P WKT 2010 06 23 12 19 55 31.3200 -97.3300 251.000 30.0 123.259 4.320 -999.990 -999.990 1.233 ..P WKT 2010 06 23 12 24 55 31.3200 -97.3300 251.000 122.0 96.350 3.620 -999.990 -999.990 0.963 ..P WKT 2010 06 23 12 29 55 31.3200 -97.3300 251.000 457.0 104.518 3.560 -999.990 -999.990 1.045 ..P WKT 2010 06 23 12 34 55 31.3200 -97.3300 251.000 30.0 125.322 4.470 -999.990 -999.990 1.253 ..P WKT 2010 06 23 12 39 55 31.3200 -97.3300 251.000 122.0 93.905 3.760 -999.990 -999.990 0.939 ..P WKT 2010 06 23 12 44 55 31.3200 -97.3300 251.000 457.0 91.684 3.280 -999.990 -999.990 0.917 ..P WKT 2010 06 23 12 54 55 31.3200 -97.3300 251.000 30.0 121.500 3.430 -999.990 -999.990 1.215 ..P WKT 2010 06 23 12 59 55 31.3200 -97.3300 251.000 122.0 97.906 3.760 -999.990 -999.990 0.979 ..P WKT 2010 06 23 13 04 55 31.3200 -97.3300 251.000 457.0 91.027 3.690 -999.990 -999.990 0.910 ..P WKT 2010 06 23 13 09 55 31.3200 -97.3300 251.000 30.0 114.648 4.470 -999.990 -999.990 1.146 ..P WKT 2010 06 23 13 14 55 31.3200 -97.3300 251.000 122.0 109.598 5.650 -999.990 -999.990 1.096 ..P WKT 2010 06 23 13 19 55 31.3200 -97.3300 251.000 457.0 94.561 3.690 -999.990 -999.990 0.946 ..P WKT 2010 06 23 13 29 55 31.3200 -97.3300 251.000 30.0 103.940 3.860 -999.990 -999.990 1.039 ..P WKT 2010 06 23 13 34 55 31.3200 -97.3300 251.000 122.0 105.014 4.060 -999.990 -999.990 1.050 ..P WKT 2010 06 23 13 39 55 31.3200 -97.3300 251.000 457.0 101.163 4.170 -999.990 -999.990 1.012 ..P WKT 2010 06 23 13 44 55 31.3200 -97.3300 251.000 30.0 104.912 4.550 -999.990 -999.990 1.049 ..P WKT 2010 06 23 13 49 55 31.3200 -97.3300 251.000 122.0 112.322 4.590 -999.990 -999.990 1.123 ..P WKT 2010 06 23 13 54 55 31.3200 -97.3300 251.000 457.0 100.161 4.440 -999.990 -999.990 1.002 ..P WKT 2010 06 23 14 04 55 31.3200 -97.3300 251.000 30.0 100.559 4.070 -999.990 -999.990 1.006 ..P WKT 2010 06 23 14 09 55 31.3200 -97.3300 251.000 122.0 100.165 4.010 -999.990 -999.990 1.002 ..P WKT 2010 06 23 14 14 55 31.3200 -97.3300 251.000 457.0 86.522 4.080 -999.990 -999.990 0.865 ..P WKT 2010 06 23 14 19 55 31.3200 -97.3300 251.000 30.0 102.477 4.510 -999.990 -999.990 1.025 ..P WKT 2010 06 23 14 24 55 31.3200 -97.3300 251.000 122.0 104.197 4.120 -999.990 -999.990 1.042 ..P WKT 2010 06 23 14 29 55 31.3200 -97.3300 251.000 457.0 89.841 5.240 -999.990 -999.990 0.898 ..P WKT 2010 06 23 14 39 55 31.3200 -97.3300 251.000 30.0 100.373 5.130 -999.990 -999.990 1.004 ..P WKT 2010 06 23 14 44 55 31.3200 -97.3300 251.000 122.0 111.730 4.350 -999.990 -999.990 1.117 ..P WKT 2010 06 23 14 49 55 31.3200 -97.3300 251.000 457.0 113.777 4.180 -999.990 -999.990 1.138 ..P WKT 2010 06 23 14 54 55 31.3200 -97.3300 251.000 30.0 107.637 4.960 -999.990 -999.990 1.076 ..P WKT 2010 06 23 14 59 55 31.3200 -97.3300 251.000 122.0 111.096 4.200 -999.990 -999.990 1.111 ..P WKT 2010 06 23 15 04 55 31.3200 -97.3300 251.000 457.0 97.751 3.550 -999.990 -999.990 0.978 ..P WKT 2010 06 23 15 14 55 31.3200 -97.3300 251.000 30.0 100.026 3.230 -999.990 -999.990 1.000 ..P WKT 2010 06 23 15 19 55 31.3200 -97.3300 251.000 122.0 107.886 3.830 -999.990 -999.990 1.079 ..P WKT 2010 06 23 15 24 55 31.3200 -97.3300 251.000 457.0 101.899 3.930 -999.990 -999.990 1.019 ..P WKT 2010 06 23 15 29 55 31.3200 -97.3300 251.000 30.0 100.434 4.700 -999.990 -999.990 1.004 ..P WKT 2010 06 23 15 34 55 31.3200 -97.3300 251.000 122.0 104.906 3.230 -999.990 -999.990 1.049 ..P WKT 2010 06 23 15 39 55 31.3200 -97.3300 251.000 457.0 97.500 3.180 -999.990 -999.990 0.975 ..P WKT 2010 06 23 15 49 55 31.3200 -97.3300 251.000 30.0 103.820 3.200 -999.990 -999.990 1.038 ..P WKT 2010 06 23 15 54 55 31.3200 -97.3300 251.000 122.0 109.631 3.250 -999.990 -999.990 1.096 ..P WKT 2010 06 23 15 59 55 31.3200 -97.3300 251.000 457.0 102.989 3.750 -999.990 -999.990 1.030 ..P WKT 2010 06 23 16 04 55 31.3200 -97.3300 251.000 30.0 104.555 5.840 -999.990 -999.990 1.046 ..P WKT 2010 06 23 16 09 55 31.3200 -97.3300 251.000 122.0 103.573 4.020 -999.990 -999.990 1.036 ..P WKT 2010 06 23 16 14 55 31.3200 -97.3300 251.000 457.0 97.208 3.670 -999.990 -999.990 0.972 ..P WKT 2010 06 23 16 24 55 31.3200 -97.3300 251.000 30.0 105.703 4.510 -999.990 -999.990 1.057 ..P WKT 2010 06 23 16 29 55 31.3200 -97.3300 251.000 122.0 106.968 5.390 -999.990 -999.990 1.070 ..P WKT 2010 06 23 16 34 55 31.3200 -97.3300 251.000 457.0 104.548 4.200 -999.990 -999.990 1.045 ..P WKT 2010 06 23 16 39 55 31.3200 -97.3300 251.000 30.0 104.961 4.830 -999.990 -999.990 1.050 ..P WKT 2010 06 23 16 44 55 31.3200 -97.3300 251.000 122.0 101.689 4.660 -999.990 -999.990 1.017 ..P WKT 2010 06 23 16 49 55 31.3200 -97.3300 251.000 457.0 103.804 5.280 -999.990 -999.990 1.038 ..P WKT 2010 06 23 17 04 55 31.3200 -97.3300 251.000 30.0 110.095 5.210 -999.990 -999.990 1.101 ..P WKT 2010 06 23 17 09 55 31.3200 -97.3300 251.000 122.0 111.473 6.390 -999.990 -999.990 1.115 ..P WKT 2010 06 23 17 14 55 31.3200 -97.3300 251.000 457.0 101.212 4.770 -999.990 -999.990 1.012 ..P WKT 2010 06 23 17 19 55 31.3200 -97.3300 251.000 30.0 104.861 3.880 -999.990 -999.990 1.049 ..P WKT 2010 06 23 17 24 55 31.3200 -97.3300 251.000 122.0 111.352 3.970 -999.990 -999.990 1.114 ..P WKT 2010 06 23 17 29 55 31.3200 -97.3300 251.000 457.0 100.091 3.580 -999.990 -999.990 1.001 ..P WKT 2010 06 23 17 39 55 31.3200 -97.3300 251.000 30.0 98.797 4.630 -999.990 -999.990 0.988 ..P WKT 2010 06 23 17 44 55 31.3200 -97.3300 251.000 122.0 107.779 3.460 -999.990 -999.990 1.078 ..P WKT 2010 06 23 17 49 55 31.3200 -97.3300 251.000 457.0 102.123 4.410 -999.990 -999.990 1.021 ..P WKT 2010 06 23 17 54 55 31.3200 -97.3300 251.000 30.0 101.440 3.790 -999.990 -999.990 1.014 ..P WKT 2010 06 23 17 59 55 31.3200 -97.3300 251.000 122.0 106.873 3.890 -999.990 -999.990 1.069 ..P WKT 2010 06 23 18 04 55 31.3200 -97.3300 251.000 457.0 99.648 3.430 -999.990 -999.990 0.996 ..P WKT 2010 06 23 18 14 55 31.3200 -97.3300 251.000 30.0 109.727 3.750 -999.990 -999.990 1.097 ..P WKT 2010 06 23 18 19 55 31.3200 -97.3300 251.000 122.0 110.245 3.570 -999.990 -999.990 1.102 ..P WKT 2010 06 23 18 24 55 31.3200 -97.3300 251.000 457.0 109.198 3.980 -999.990 -999.990 1.092 ..P WKT 2010 06 23 18 29 55 31.3200 -97.3300 251.000 30.0 109.574 4.510 -999.990 -999.990 1.096 ..P WKT 2010 06 23 18 34 55 31.3200 -97.3300 251.000 122.0 117.926 5.240 -999.990 -999.990 1.179 ..P WKT 2010 06 23 18 39 55 31.3200 -97.3300 251.000 457.0 100.355 3.310 -999.990 -999.990 1.004 ..P WKT 2010 06 23 18 49 55 31.3200 -97.3300 251.000 30.0 101.410 4.500 -999.990 -999.990 1.014 ..P WKT 2010 06 23 18 54 55 31.3200 -97.3300 251.000 122.0 100.237 4.460 -999.990 -999.990 1.002 ..P WKT 2010 06 23 18 59 55 31.3200 -97.3300 251.000 457.0 97.068 4.330 -999.990 -999.990 0.971 ..P WKT 2010 06 23 19 04 55 31.3200 -97.3300 251.000 30.0 99.744 5.640 -999.990 -999.990 0.997 ..P WKT 2010 06 23 19 09 55 31.3200 -97.3300 251.000 122.0 105.844 4.310 -999.990 -999.990 1.058 ..P WKT 2010 06 23 19 14 55 31.3200 -97.3300 251.000 457.0 99.963 4.910 -999.990 -999.990 1.000 ..P WKT 2010 06 23 19 24 55 31.3200 -97.3300 251.000 30.0 99.450 4.990 -999.990 -999.990 0.995 ..P WKT 2010 06 23 19 29 55 31.3200 -97.3300 251.000 122.0 109.958 4.860 -999.990 -999.990 1.100 ..P WKT 2010 06 23 19 34 55 31.3200 -97.3300 251.000 457.0 93.632 4.870 -999.990 -999.990 0.936 ..P WKT 2010 06 23 19 39 55 31.3200 -97.3300 251.000 30.0 95.291 5.840 -999.990 -999.990 0.953 ..P WKT 2010 06 23 19 44 55 31.3200 -97.3300 251.000 122.0 107.234 4.890 -999.990 -999.990 1.072 ..P WKT 2010 06 23 19 49 55 31.3200 -97.3300 251.000 457.0 96.040 4.160 -999.990 -999.990 0.960 ..P WKT 2010 06 23 19 59 55 31.3200 -97.3300 251.000 30.0 103.772 3.440 -999.990 -999.990 1.038 ..P WKT 2010 06 23 20 04 55 31.3200 -97.3300 251.000 122.0 114.419 3.420 -999.990 -999.990 1.144 ..P WKT 2010 06 23 20 09 55 31.3200 -97.3300 251.000 457.0 96.192 4.220 -999.990 -999.990 0.962 ..P WKT 2010 06 23 20 14 55 31.3200 -97.3300 251.000 30.0 99.693 3.480 -999.990 -999.990 0.997 ..P WKT 2010 06 23 20 19 55 31.3200 -97.3300 251.000 122.0 105.769 3.150 -999.990 -999.990 1.058 ..P WKT 2010 06 23 20 24 55 31.3200 -97.3300 251.000 457.0 91.248 3.460 -999.990 -999.990 0.912 ..P WKT 2010 06 23 20 34 55 31.3200 -97.3300 251.000 30.0 102.484 4.300 -999.990 -999.990 1.025 ..P WKT 2010 06 23 20 39 55 31.3200 -97.3300 251.000 122.0 101.634 3.470 -999.990 -999.990 1.016 ..P WKT 2010 06 23 20 44 55 31.3200 -97.3300 251.000 457.0 100.784 3.660 -999.990 -999.990 1.008 ..P WKT 2010 06 23 20 49 55 31.3200 -97.3300 251.000 30.0 103.083 4.030 -999.990 -999.990 1.031 ..P WKT 2010 06 23 20 54 55 31.3200 -97.3300 251.000 122.0 106.242 4.210 -999.990 -999.990 1.062 ..P WKT 2010 06 23 20 59 55 31.3200 -97.3300 251.000 457.0 101.381 2.990 -999.990 -999.990 1.014 ..P WKT 2010 06 23 21 09 55 31.3200 -97.3300 251.000 30.0 107.417 3.320 -999.990 -999.990 1.074 ..P WKT 2010 06 23 21 14 55 31.3200 -97.3300 251.000 122.0 112.157 4.630 -999.990 -999.990 1.122 ..P WKT 2010 06 23 21 19 55 31.3200 -97.3300 251.000 457.0 107.866 4.420 -999.990 -999.990 1.079 ..P WKT 2010 06 23 21 24 55 31.3200 -97.3300 251.000 30.0 108.020 6.370 -999.990 -999.990 1.080 ..P WKT 2010 06 23 21 29 55 31.3200 -97.3300 251.000 122.0 106.165 4.780 -999.990 -999.990 1.062 ..P WKT 2010 06 23 21 34 55 31.3200 -97.3300 251.000 457.0 103.448 4.540 -999.990 -999.990 1.034 ..P WKT 2010 06 23 21 44 55 31.3200 -97.3300 251.000 30.0 111.789 4.120 -999.990 -999.990 1.118 ..P WKT 2010 06 23 21 49 55 31.3200 -97.3300 251.000 122.0 117.685 5.280 -999.990 -999.990 1.177 ..P WKT 2010 06 23 21 54 55 31.3200 -97.3300 251.000 457.0 116.118 6.140 -999.990 -999.990 1.161 ..P WKT 2010 06 23 21 59 55 31.3200 -97.3300 251.000 30.0 117.134 4.640 -999.990 -999.990 1.171 ..P WKT 2010 06 23 22 04 55 31.3200 -97.3300 251.000 122.0 123.753 4.430 -999.990 -999.990 1.238 ..P WKT 2010 06 23 22 09 55 31.3200 -97.3300 251.000 457.0 116.583 3.230 -999.990 -999.990 1.166 ..P WKT 2010 06 23 22 19 55 31.3200 -97.3300 251.000 30.0 115.374 3.870 -999.990 -999.990 1.154 ..P WKT 2010 06 23 22 24 55 31.3200 -97.3300 251.000 122.0 117.028 4.950 -999.990 -999.990 1.170 ..P WKT 2010 06 23 22 29 55 31.3200 -97.3300 251.000 457.0 110.775 4.610 -999.990 -999.990 1.108 ..P WKT 2010 06 23 22 34 55 31.3200 -97.3300 251.000 30.0 106.820 5.640 -999.990 -999.990 1.068 ..P WKT 2010 06 23 22 39 55 31.3200 -97.3300 251.000 122.0 118.686 3.160 -999.990 -999.990 1.187 ..P WKT 2010 06 23 22 44 55 31.3200 -97.3300 251.000 457.0 106.387 2.700 -999.990 -999.990 1.064 ..P WKT 2010 06 23 22 54 55 31.3200 -97.3300 251.000 30.0 115.289 3.730 -999.990 -999.990 1.153 ..P WKT 2010 06 23 22 59 55 31.3200 -97.3300 251.000 122.0 119.659 3.160 -999.990 -999.990 1.197 ..P WKT 2010 06 23 23 04 55 31.3200 -97.3300 251.000 457.0 120.000 5.320 -999.990 -999.990 1.200 ..P WKT 2010 06 23 23 09 55 31.3200 -97.3300 251.000 30.0 120.630 6.540 -999.990 -999.990 1.206 ..P WKT 2010 06 23 23 14 55 31.3200 -97.3300 251.000 122.0 120.395 5.960 -999.990 -999.990 1.204 ..P WKT 2010 06 23 23 19 55 31.3200 -97.3300 251.000 457.0 116.127 4.180 -999.990 -999.990 1.161 ..P WKT 2010 06 23 23 29 55 31.3200 -97.3300 251.000 30.0 118.626 3.610 -999.990 -999.990 1.186 ..P WKT 2010 06 23 23 34 55 31.3200 -97.3300 251.000 122.0 124.245 5.630 -999.990 -999.990 1.242 ..P WKT 2010 06 23 23 39 55 31.3200 -97.3300 251.000 457.0 108.237 6.450 -999.990 -999.990 1.082 ..P WKT 2010 06 23 23 44 55 31.3200 -97.3300 251.000 30.0 109.530 6.620 -999.990 -999.990 1.095 ..P WKT 2010 06 23 23 49 55 31.3200 -97.3300 251.000 122.0 115.438 6.200 -999.990 -999.990 1.154 ..P WKT 2010 06 24 00 09 55 31.3200 -97.3300 251.000 457.0 104.017 3.090 -999.990 -999.990 1.040 ..P WKT 2010 06 24 00 10 25 31.3200 -97.3300 251.000 457.0 104.634 3.260 -999.990 -999.990 1.046 ..P WKT 2010 06 24 00 10 55 31.3200 -97.3300 251.000 457.0 103.809 3.740 -999.990 -999.990 1.038 ..P WKT 2010 06 24 00 11 25 31.3200 -97.3300 251.000 457.0 106.445 3.680 -999.990 -999.990 1.064 ..P WKT 2010 06 24 00 11 55 31.3200 -97.3300 251.000 457.0 98.985 6.450 -999.990 -999.990 0.990 ..P WKT 2010 06 24 00 12 25 31.3200 -97.3300 251.000 457.0 101.333 6.510 -999.990 -999.990 1.013 ..P WKT 2010 06 24 00 12 55 31.3200 -97.3300 251.000 457.0 106.565 4.530 -999.990 -999.990 1.066 ..P WKT 2010 06 24 00 13 25 31.3200 -97.3300 251.000 457.0 99.394 4.580 -999.990 -999.990 0.994 ..P WKT 2010 06 24 00 13 55 31.3200 -97.3300 251.000 457.0 103.184 4.640 -999.990 -999.990 1.032 ..P WKT 2010 06 24 00 14 25 31.3200 -97.3300 251.000 457.0 100.629 4.540 -999.990 -999.990 1.006 ..P WKT 2010 06 24 00 14 55 31.3200 -97.3300 251.000 457.0 100.380 4.430 -999.990 -999.990 1.004 ..P WKT 2010 06 24 00 19 55 31.3200 -97.3300 251.000 30.0 108.854 5.830 -999.990 -999.990 1.089 ..P WKT 2010 06 24 00 24 55 31.3200 -97.3300 251.000 122.0 116.170 6.200 -999.990 -999.990 1.162 ..P WKT 2010 06 24 00 29 55 31.3200 -97.3300 251.000 457.0 100.432 5.070 -999.990 -999.990 1.004 ..P WKT 2010 06 24 00 34 55 31.3200 -97.3300 251.000 30.0 104.002 3.970 -999.990 -999.990 1.040 ..P WKT 2010 06 24 00 39 55 31.3200 -97.3300 251.000 122.0 110.448 4.360 -999.990 -999.990 1.104 ..P WKT 2010 06 24 00 44 55 31.3200 -97.3300 251.000 457.0 110.558 3.530 -999.990 -999.990 1.106 ..P WKT 2010 06 24 00 54 55 31.3200 -97.3300 251.000 30.0 104.845 2.750 -999.990 -999.990 1.048 ..P WKT 2010 06 24 00 59 55 31.3200 -97.3300 251.000 122.0 110.097 3.320 -999.990 -999.990 1.101 ..P WKT 2010 06 24 01 04 55 31.3200 -97.3300 251.000 457.0 109.163 4.490 -999.990 -999.990 1.092 ..P WKT 2010 06 24 01 09 55 31.3200 -97.3300 251.000 30.0 106.794 2.720 -999.990 -999.990 1.068 ..P WKT 2010 06 24 01 14 55 31.3200 -97.3300 251.000 122.0 113.046 3.560 -999.990 -999.990 1.130 ..P WKT 2010 06 24 01 19 55 31.3200 -97.3300 251.000 457.0 110.391 3.030 -999.990 -999.990 1.104 ..P WKT 2010 06 24 01 29 55 31.3200 -97.3300 251.000 30.0 106.948 2.970 -999.990 -999.990 1.069 ..P WKT 2010 06 24 01 34 55 31.3200 -97.3300 251.000 122.0 118.359 3.160 -999.990 -999.990 1.184 ..P WKT 2010 06 24 01 39 55 31.3200 -97.3300 251.000 457.0 114.557 3.900 -999.990 -999.990 1.146 ..P WKT 2010 06 24 01 44 55 31.3200 -97.3300 251.000 30.0 110.900 5.350 -999.990 -999.990 1.109 ..P WKT 2010 06 24 01 49 55 31.3200 -97.3300 251.000 122.0 120.579 3.080 -999.990 -999.990 1.206 ..P WKT 2010 06 24 01 54 55 31.3200 -97.3300 251.000 457.0 118.355 3.000 -999.990 -999.990 1.184 ..P WKT 2010 06 24 02 04 55 31.3200 -97.3300 251.000 30.0 111.356 3.220 -999.990 -999.990 1.114 ..P WKT 2010 06 24 02 09 55 31.3200 -97.3300 251.000 122.0 120.327 3.250 -999.990 -999.990 1.203 ..P WKT 2010 06 24 02 14 55 31.3200 -97.3300 251.000 457.0 115.695 3.620 -999.990 -999.990 1.157 ..P WKT 2010 06 24 02 19 55 31.3200 -97.3300 251.000 30.0 114.642 3.120 -999.990 -999.990 1.146 ..P WKT 2010 06 24 02 24 55 31.3200 -97.3300 251.000 122.0 117.595 3.570 -999.990 -999.990 1.176 ..P WKT 2010 06 24 02 29 55 31.3200 -97.3300 251.000 457.0 117.400 3.030 -999.990 -999.990 1.174 ..P WKT 2010 06 24 02 39 55 31.3200 -97.3300 251.000 30.0 109.354 4.540 -999.990 -999.990 1.094 ..P WKT 2010 06 24 02 44 55 31.3200 -97.3300 251.000 122.0 109.366 2.890 -999.990 -999.990 1.094 ..P WKT 2010 06 24 02 49 55 31.3200 -97.3300 251.000 457.0 106.664 3.010 -999.990 -999.990 1.067 ..P WKT 2010 06 24 02 54 55 31.3200 -97.3300 251.000 30.0 112.104 3.490 -999.990 -999.990 1.121 ..P WKT 2010 06 24 02 59 55 31.3200 -97.3300 251.000 122.0 116.398 4.000 -999.990 -999.990 1.164 ..P WKT 2010 06 24 03 04 55 31.3200 -97.3300 251.000 457.0 114.695 4.130 -999.990 -999.990 1.147 ..P WKT 2010 06 24 03 14 55 31.3200 -97.3300 251.000 30.0 106.952 3.740 -999.990 -999.990 1.070 ..P WKT 2010 06 24 03 19 55 31.3200 -97.3300 251.000 122.0 118.027 4.030 -999.990 -999.990 1.180 ..P WKT 2010 06 24 03 24 55 31.3200 -97.3300 251.000 457.0 102.008 2.980 -999.990 -999.990 1.020 ..P WKT 2010 06 24 03 29 55 31.3200 -97.3300 251.000 30.0 106.523 3.500 -999.990 -999.990 1.065 ..P WKT 2010 06 24 03 34 55 31.3200 -97.3300 251.000 122.0 108.184 3.200 -999.990 -999.990 1.082 ..P WKT 2010 06 24 03 39 55 31.3200 -97.3300 251.000 457.0 96.741 2.900 -999.990 -999.990 0.967 ..P WKT 2010 06 24 03 49 55 31.3200 -97.3300 251.000 30.0 113.611 3.250 -999.990 -999.990 1.136 ..P WKT 2010 06 24 03 54 55 31.3200 -97.3300 251.000 122.0 108.031 3.460 -999.990 -999.990 1.080 ..P WKT 2010 06 24 03 59 55 31.3200 -97.3300 251.000 457.0 101.316 4.430 -999.990 -999.990 1.013 ..P WKT 2010 06 24 04 04 55 31.3200 -97.3300 251.000 30.0 109.112 5.350 -999.990 -999.990 1.091 ..P WKT 2010 06 24 04 09 55 31.3200 -97.3300 251.000 122.0 108.941 4.500 -999.990 -999.990 1.089 ..P WKT 2010 06 24 04 14 55 31.3200 -97.3300 251.000 457.0 97.684 4.110 -999.990 -999.990 0.977 ..P WKT 2010 06 24 04 24 55 31.3200 -97.3300 251.000 30.0 113.991 3.740 -999.990 -999.990 1.140 ..P WKT 2010 06 24 04 29 55 31.3200 -97.3300 251.000 122.0 104.892 4.630 -999.990 -999.990 1.049 ..P WKT 2010 06 24 04 34 55 31.3200 -97.3300 251.000 457.0 89.268 5.560 -999.990 -999.990 0.893 ..P WKT 2010 06 24 04 39 55 31.3200 -97.3300 251.000 30.0 106.014 6.990 -999.990 -999.990 1.060 ..P WKT 2010 06 24 04 44 55 31.3200 -97.3300 251.000 122.0 106.007 6.060 -999.990 -999.990 1.060 ..P WKT 2010 06 24 04 49 55 31.3200 -97.3300 251.000 457.0 89.261 5.020 -999.990 -999.990 0.893 ..P WKT 2010 06 24 05 04 55 31.3200 -97.3300 251.000 30.0 92.433 6.170 -999.990 -999.990 0.924 ..P WKT 2010 06 24 05 09 55 31.3200 -97.3300 251.000 122.0 93.310 7.380 -999.990 -999.990 0.933 ..P WKT 2010 06 24 05 14 55 31.3200 -97.3300 251.000 457.0 86.822 7.430 -999.990 -999.990 0.868 ..P WKT 2010 06 24 05 19 55 31.3200 -97.3300 251.000 30.0 92.232 5.010 -999.990 -999.990 0.922 ..P WKT 2010 06 24 05 24 55 31.3200 -97.3300 251.000 122.0 92.825 4.290 -999.990 -999.990 0.928 ..P WKT 2010 06 24 05 29 55 31.3200 -97.3300 251.000 457.0 96.673 3.960 -999.990 -999.990 0.967 ..P WKT 2010 06 24 05 39 55 31.3200 -97.3300 251.000 30.0 95.018 4.220 -999.990 -999.990 0.950 ..P WKT 2010 06 24 05 44 55 31.3200 -97.3300 251.000 122.0 101.538 4.410 -999.990 -999.990 1.015 ..P WKT 2010 06 24 05 49 55 31.3200 -97.3300 251.000 457.0 91.233 4.010 -999.990 -999.990 0.912 ..P WKT 2010 06 24 05 54 55 31.3200 -97.3300 251.000 30.0 97.751 4.960 -999.990 -999.990 0.978 ..P WKT 2010 06 24 05 59 55 31.3200 -97.3300 251.000 122.0 99.179 3.950 -999.990 -999.990 0.992 ..P WKT 2010 06 24 06 04 55 31.3200 -97.3300 251.000 457.0 85.495 4.100 -999.990 -999.990 0.855 ..P WKT 2010 06 24 06 14 55 31.3200 -97.3300 251.000 30.0 92.449 4.090 -999.990 -999.990 0.924 ..P WKT 2010 06 24 06 19 55 31.3200 -97.3300 251.000 122.0 101.073 4.570 -999.990 -999.990 1.011 ..P WKT 2010 06 24 06 24 55 31.3200 -97.3300 251.000 457.0 86.136 4.490 -999.990 -999.990 0.861 ..P WKT 2010 06 24 06 29 55 31.3200 -97.3300 251.000 30.0 94.757 4.830 -999.990 -999.990 0.948 ..P WKT 2010 06 24 06 34 55 31.3200 -97.3300 251.000 122.0 99.425 4.290 -999.990 -999.990 0.994 ..P WKT 2010 06 24 06 39 55 31.3200 -97.3300 251.000 457.0 83.091 3.800 -999.990 -999.990 0.831 ..P WKT 2010 06 24 06 49 55 31.3200 -97.3300 251.000 30.0 101.119 4.080 -999.990 -999.990 1.011 ..P WKT 2010 06 24 06 54 55 31.3200 -97.3300 251.000 122.0 103.769 4.060 -999.990 -999.990 1.038 ..P WKT 2010 06 24 06 59 55 31.3200 -97.3300 251.000 457.0 90.370 5.080 -999.990 -999.990 0.904 ..P WKT 2010 06 24 07 04 55 31.3200 -97.3300 251.000 30.0 97.242 4.390 -999.990 -999.990 0.972 ..P WKT 2010 06 24 07 09 55 31.3200 -97.3300 251.000 122.0 98.203 4.270 -999.990 -999.990 0.982 ..P WKT 2010 06 24 07 14 55 31.3200 -97.3300 251.000 457.0 82.566 5.370 -999.990 -999.990 0.826 ..P WKT 2010 06 24 07 24 55 31.3200 -97.3300 251.000 30.0 94.774 4.330 -999.990 -999.990 0.948 ..P WKT 2010 06 24 07 29 55 31.3200 -97.3300 251.000 122.0 100.110 4.090 -999.990 -999.990 1.001 ..P WKT 2010 06 24 07 34 55 31.3200 -97.3300 251.000 457.0 84.091 4.420 -999.990 -999.990 0.841 ..P WKT 2010 06 24 07 39 55 31.3200 -97.3300 251.000 30.0 94.763 3.870 -999.990 -999.990 0.948 ..P WKT 2010 06 24 07 44 55 31.3200 -97.3300 251.000 122.0 99.532 5.330 -999.990 -999.990 0.995 ..P WKT 2010 06 24 07 49 55 31.3200 -97.3300 251.000 457.0 87.457 4.690 -999.990 -999.990 0.875 ..P WKT 2010 06 24 07 59 55 31.3200 -97.3300 251.000 30.0 93.746 3.550 -999.990 -999.990 0.937 ..P WKT 2010 06 24 08 04 55 31.3200 -97.3300 251.000 122.0 91.058 3.960 -999.990 -999.990 0.911 ..P WKT 2010 06 24 08 09 55 31.3200 -97.3300 251.000 457.0 79.680 4.430 -999.990 -999.990 0.797 ..P WKT 2010 06 24 08 14 55 31.3200 -97.3300 251.000 30.0 86.528 4.380 -999.990 -999.990 0.865 ..P WKT 2010 06 24 08 19 55 31.3200 -97.3300 251.000 122.0 88.608 4.010 -999.990 -999.990 0.886 ..P WKT 2010 06 24 08 24 55 31.3200 -97.3300 251.000 457.0 81.443 3.840 -999.990 -999.990 0.814 ..P WKT 2010 06 24 08 34 55 31.3200 -97.3300 251.000 30.0 95.742 4.120 -999.990 -999.990 0.957 ..P WKT 2010 06 24 08 39 55 31.3200 -97.3300 251.000 122.0 95.077 5.080 -999.990 -999.990 0.951 ..P WKT 2010 06 24 08 44 55 31.3200 -97.3300 251.000 457.0 83.782 4.010 -999.990 -999.990 0.838 ..P WKT 2010 06 24 08 49 55 31.3200 -97.3300 251.000 30.0 98.227 4.450 -999.990 -999.990 0.982 ..P WKT 2010 06 24 08 54 55 31.3200 -97.3300 251.000 122.0 100.499 4.230 -999.990 -999.990 1.005 ..P WKT 2010 06 24 08 59 55 31.3200 -97.3300 251.000 457.0 95.362 4.310 -999.990 -999.990 0.954 ..P WKT 2010 06 24 09 09 55 31.3200 -97.3300 251.000 30.0 92.720 4.640 -999.990 -999.990 0.927 ..P WKT 2010 06 24 09 14 55 31.3200 -97.3300 251.000 122.0 95.071 4.630 -999.990 -999.990 0.951 ..P WKT 2010 06 24 09 19 55 31.3200 -97.3300 251.000 457.0 81.225 6.540 -999.990 -999.990 0.812 ..P WKT 2010 06 24 09 24 55 31.3200 -97.3300 251.000 30.0 89.999 4.690 -999.990 -999.990 0.900 ..P WKT 2010 06 24 09 29 55 31.3200 -97.3300 251.000 122.0 96.674 4.960 -999.990 -999.990 0.967 ..P WKT 2010 06 24 09 34 55 31.3200 -97.3300 251.000 457.0 84.374 4.930 -999.990 -999.990 0.844 ..P WKT 2010 06 24 09 44 55 31.3200 -97.3300 251.000 30.0 98.832 5.020 -999.990 -999.990 0.988 ..P WKT 2010 06 24 09 49 55 31.3200 -97.3300 251.000 122.0 95.184 5.740 -999.990 -999.990 0.952 ..P WKT 2010 06 24 09 54 55 31.3200 -97.3300 251.000 457.0 82.899 4.410 -999.990 -999.990 0.829 ..P WKT 2010 06 24 09 59 55 31.3200 -97.3300 251.000 30.0 93.604 6.340 -999.990 -999.990 0.936 ..P WKT 2010 06 24 10 04 55 31.3200 -97.3300 251.000 122.0 99.847 4.850 -999.990 -999.990 0.998 ..P WKT 2010 06 24 10 09 55 31.3200 -97.3300 251.000 457.0 82.421 5.300 -999.990 -999.990 0.824 ..P WKT 2010 06 24 10 19 55 31.3200 -97.3300 251.000 30.0 95.121 4.290 -999.990 -999.990 0.951 ..P WKT 2010 06 24 10 24 55 31.3200 -97.3300 251.000 122.0 95.594 5.450 -999.990 -999.990 0.956 ..P WKT 2010 06 24 10 29 55 31.3200 -97.3300 251.000 457.0 83.413 5.290 -999.990 -999.990 0.834 ..P WKT 2010 06 24 10 34 55 31.3200 -97.3300 251.000 30.0 84.863 5.480 -999.990 -999.990 0.849 ..P WKT 2010 06 24 10 39 55 31.3200 -97.3300 251.000 122.0 100.485 5.000 -999.990 -999.990 1.005 ..P WKT 2010 06 24 10 44 55 31.3200 -97.3300 251.000 457.0 77.617 4.740 -999.990 -999.990 0.776 ..P WKT 2010 06 24 10 54 55 31.3200 -97.3300 251.000 30.0 86.129 6.230 -999.990 -999.990 0.861 ..P WKT 2010 06 24 10 59 55 31.3200 -97.3300 251.000 122.0 96.518 4.890 -999.990 -999.990 0.965 ..P WKT 2010 06 24 11 04 55 31.3200 -97.3300 251.000 457.0 80.814 5.060 -999.990 -999.990 0.808 ..P WKT 2010 06 24 11 09 55 31.3200 -97.3300 251.000 30.0 90.089 5.230 -999.990 -999.990 0.901 ..P WKT 2010 06 24 11 14 55 31.3200 -97.3300 251.000 122.0 107.956 4.670 -999.990 -999.990 1.080 ..P WKT 2010 06 24 11 19 55 31.3200 -97.3300 251.000 457.0 87.272 5.000 -999.990 -999.990 0.873 ..P WKT 2010 06 24 11 29 55 31.3200 -97.3300 251.000 30.0 101.204 4.810 -999.990 -999.990 1.012 ..P WKT 2010 06 24 11 34 55 31.3200 -97.3300 251.000 122.0 126.646 4.940 -999.990 -999.990 1.266 ..P WKT 2010 06 24 11 39 55 31.3200 -97.3300 251.000 457.0 89.205 5.870 -999.990 -999.990 0.892 ..P WKT 2010 06 24 11 44 55 31.3200 -97.3300 251.000 30.0 95.254 5.600 -999.990 -999.990 0.953 ..P WKT 2010 06 24 11 49 55 31.3200 -97.3300 251.000 122.0 133.409 5.160 -999.990 -999.990 1.334 ..P WKT 2010 06 24 12 09 55 31.3200 -97.3300 251.000 457.0 89.377 5.120 -999.990 -999.990 0.894 ..P WKT 2010 06 24 12 10 25 31.3200 -97.3300 251.000 457.0 86.526 5.330 -999.990 -999.990 0.865 ..P WKT 2010 06 24 12 10 55 31.3200 -97.3300 251.000 457.0 83.953 5.100 -999.990 -999.990 0.840 ..P WKT 2010 06 24 12 11 25 31.3200 -97.3300 251.000 457.0 88.849 5.770 -999.990 -999.990 0.888 ..P WKT 2010 06 24 12 11 55 31.3200 -97.3300 251.000 457.0 90.425 5.180 -999.990 -999.990 0.904 ..P WKT 2010 06 24 12 12 25 31.3200 -97.3300 251.000 457.0 85.361 5.420 -999.990 -999.990 0.854 ..P WKT 2010 06 24 12 12 55 31.3200 -97.3300 251.000 457.0 88.321 5.610 -999.990 -999.990 0.883 ..P WKT 2010 06 24 12 13 25 31.3200 -97.3300 251.000 457.0 83.811 5.310 -999.990 -999.990 0.838 ..P WKT 2010 06 24 12 13 55 31.3200 -97.3300 251.000 457.0 85.388 5.040 -999.990 -999.990 0.854 ..P WKT 2010 06 24 12 14 25 31.3200 -97.3300 251.000 457.0 80.324 5.120 -999.990 -999.990 0.803 ..P WKT 2010 06 24 12 14 55 31.3200 -97.3300 251.000 457.0 84.390 5.630 -999.990 -999.990 0.844 ..P WKT 2010 06 24 12 19 55 31.3200 -97.3300 251.000 30.0 103.198 5.240 -999.990 -999.990 1.032 ..P WKT 2010 06 24 12 24 55 31.3200 -97.3300 251.000 122.0 109.281 5.290 -999.990 -999.990 1.093 ..P WKT 2010 06 24 12 29 55 31.3200 -97.3300 251.000 457.0 82.432 5.390 -999.990 -999.990 0.824 ..P WKT 2010 06 24 12 34 55 31.3200 -97.3300 251.000 30.0 100.968 5.170 -999.990 -999.990 1.010 ..P WKT 2010 06 24 12 39 55 31.3200 -97.3300 251.000 122.0 103.729 4.660 -999.990 -999.990 1.037 ..P WKT 2010 06 24 12 44 55 31.3200 -97.3300 251.000 457.0 82.134 5.650 -999.990 -999.990 0.821 ..P WKT 2010 06 24 12 54 55 31.3200 -97.3300 251.000 30.0 102.913 4.780 -999.990 -999.990 1.029 ..P WKT 2010 06 24 12 59 55 31.3200 -97.3300 251.000 122.0 95.740 4.290 -999.990 -999.990 0.957 ..P WKT 2010 06 24 13 04 55 31.3200 -97.3300 251.000 457.0 73.753 4.690 -999.990 -999.990 0.738 ..P WKT 2010 06 24 13 09 55 31.3200 -97.3300 251.000 30.0 101.188 4.230 -999.990 -999.990 1.012 ..P WKT 2010 06 24 13 14 55 31.3200 -97.3300 251.000 122.0 102.322 4.360 -999.990 -999.990 1.023 ..P WKT 2010 06 24 13 19 55 31.3200 -97.3300 251.000 457.0 72.576 4.560 -999.990 -999.990 0.726 ..P WKT 2010 06 24 13 29 55 31.3200 -97.3300 251.000 30.0 98.993 4.090 -999.990 -999.990 0.990 ..P WKT 2010 06 24 13 34 55 31.3200 -97.3300 251.000 122.0 101.986 4.320 -999.990 -999.990 1.020 ..P WKT 2010 06 24 13 39 55 31.3200 -97.3300 251.000 457.0 78.248 4.260 -999.990 -999.990 0.782 ..P WKT 2010 06 24 13 44 55 31.3200 -97.3300 251.000 30.0 100.492 4.420 -999.990 -999.990 1.005 ..P WKT 2010 06 24 13 49 55 31.3200 -97.3300 251.000 122.0 106.811 4.580 -999.990 -999.990 1.068 ..P WKT 2010 06 24 13 54 55 31.3200 -97.3300 251.000 457.0 84.592 4.370 -999.990 -999.990 0.846 ..P WKT 2010 06 24 14 04 55 31.3200 -97.3300 251.000 30.0 90.221 4.410 -999.990 -999.990 0.902 ..P WKT 2010 06 24 14 09 55 31.3200 -97.3300 251.000 122.0 90.503 5.130 -999.990 -999.990 0.905 ..P WKT 2010 06 24 14 14 55 31.3200 -97.3300 251.000 457.0 71.245 4.510 -999.990 -999.990 0.712 ..P WKT 2010 06 24 14 19 55 31.3200 -97.3300 251.000 30.0 89.680 4.510 -999.990 -999.990 0.897 ..P WKT 2010 06 24 14 24 55 31.3200 -97.3300 251.000 122.0 87.744 4.320 -999.990 -999.990 0.877 ..P WKT 2010 06 24 14 29 55 31.3200 -97.3300 251.000 457.0 73.334 4.410 -999.990 -999.990 0.733 ..P WKT 2010 06 24 14 39 55 31.3200 -97.3300 251.000 30.0 90.609 4.100 -999.990 -999.990 0.906 ..P WKT 2010 06 24 14 44 55 31.3200 -97.3300 251.000 122.0 90.000 4.900 -999.990 -999.990 0.900 ..P WKT 2010 06 24 14 49 55 31.3200 -97.3300 251.000 457.0 69.980 4.140 -999.990 -999.990 0.700 ..P WKT 2010 06 24 14 54 55 31.3200 -97.3300 251.000 30.0 91.276 5.020 -999.990 -999.990 0.913 ..P WKT 2010 06 24 14 59 55 31.3200 -97.3300 251.000 122.0 86.507 4.310 -999.990 -999.990 0.865 ..P WKT 2010 06 24 15 04 55 31.3200 -97.3300 251.000 457.0 71.475 5.240 -999.990 -999.990 0.715 ..P WKT 2010 06 24 15 14 55 31.3200 -97.3300 251.000 30.0 88.244 4.330 -999.990 -999.990 0.882 ..P WKT 2010 06 24 15 19 55 31.3200 -97.3300 251.000 122.0 102.573 5.050 -999.990 -999.990 1.026 ..P WKT 2010 06 24 15 24 55 31.3200 -97.3300 251.000 457.0 73.628 4.470 -999.990 -999.990 0.736 ..P WKT 2010 06 24 15 29 55 31.3200 -97.3300 251.000 30.0 108.212 4.100 -999.990 -999.990 1.082 ..P WKT 2010 06 24 15 34 55 31.3200 -97.3300 251.000 122.0 110.893 4.670 -999.990 -999.990 1.109 ..P WKT 2010 06 24 15 39 55 31.3200 -97.3300 251.000 457.0 75.006 4.010 -999.990 -999.990 0.750 ..P WKT 2010 06 24 15 49 55 31.3200 -97.3300 251.000 30.0 96.144 3.910 -999.990 -999.990 0.961 ..P WKT 2010 06 24 15 54 55 31.3200 -97.3300 251.000 122.0 99.340 4.430 -999.990 -999.990 0.993 ..P WKT 2010 06 24 15 59 55 31.3200 -97.3300 251.000 457.0 69.508 4.850 -999.990 -999.990 0.695 ..P WKT 2010 06 24 16 04 55 31.3200 -97.3300 251.000 30.0 102.959 5.640 -999.990 -999.990 1.030 ..P WKT 2010 06 24 16 09 55 31.3200 -97.3300 251.000 122.0 93.942 7.080 -999.990 -999.990 0.939 ..P WKT 2010 06 24 16 14 55 31.3200 -97.3300 251.000 457.0 74.653 4.100 -999.990 -999.990 0.747 ..P WKT 2010 06 24 16 24 55 31.3200 -97.3300 251.000 30.0 75.255 4.020 -999.990 -999.990 0.753 ..P WKT 2010 06 24 16 29 55 31.3200 -97.3300 251.000 122.0 85.433 6.210 -999.990 -999.990 0.854 ..P WKT 2010 06 24 16 34 55 31.3200 -97.3300 251.000 457.0 96.167 5.590 -999.990 -999.990 0.962 ..P WKT 2010 06 24 16 39 55 31.3200 -97.3300 251.000 30.0 87.604 6.090 -999.990 -999.990 0.876 ..P WKT 2010 06 24 16 44 55 31.3200 -97.3300 251.000 122.0 98.757 5.480 -999.990 -999.990 0.988 ..P WKT 2010 06 24 16 49 55 31.3200 -97.3300 251.000 457.0 76.582 4.560 -999.990 -999.990 0.766 ..P WKT 2010 06 24 17 04 55 31.3200 -97.3300 251.000 30.0 82.784 5.080 -999.990 -999.990 0.828 ..P WKT 2010 06 24 17 09 55 31.3200 -97.3300 251.000 122.0 87.392 6.100 -999.990 -999.990 0.874 ..P WKT 2010 06 24 17 14 55 31.3200 -97.3300 251.000 457.0 77.692 6.250 -999.990 -999.990 0.777 ..P WKT 2010 06 24 17 19 55 31.3200 -97.3300 251.000 30.0 72.991 4.590 -999.990 -999.990 0.730 ..P WKT 2010 06 24 17 24 55 31.3200 -97.3300 251.000 122.0 87.465 4.340 -999.990 -999.990 0.875 ..P WKT 2010 06 24 17 29 55 31.3200 -97.3300 251.000 457.0 80.958 3.610 -999.990 -999.990 0.810 ..P WKT 2010 06 24 17 39 55 31.3200 -97.3300 251.000 30.0 89.145 3.760 -999.990 -999.990 0.891 ..P WKT 2010 06 24 17 44 55 31.3200 -97.3300 251.000 122.0 93.696 4.490 -999.990 -999.990 0.937 ..P WKT 2010 06 24 17 49 55 31.3200 -97.3300 251.000 457.0 85.044 3.980 -999.990 -999.990 0.850 ..P WKT 2010 06 24 17 54 55 31.3200 -97.3300 251.000 30.0 85.287 3.710 -999.990 -999.990 0.853 ..P WKT 2010 06 24 17 59 55 31.3200 -97.3300 251.000 122.0 94.148 4.880 -999.990 -999.990 0.941 ..P WKT 2010 06 24 18 04 55 31.3200 -97.3300 251.000 457.0 91.889 3.330 -999.990 -999.990 0.919 ..P WKT 2010 06 24 18 14 55 31.3200 -97.3300 251.000 30.0 85.602 3.290 -999.990 -999.990 0.856 ..P WKT 2010 06 24 18 19 55 31.3200 -97.3300 251.000 122.0 79.488 3.470 -999.990 -999.990 0.795 ..P WKT 2010 06 24 18 24 55 31.3200 -97.3300 251.000 457.0 79.075 3.440 -999.990 -999.990 0.791 ..P WKT 2010 06 24 18 29 55 31.3200 -97.3300 251.000 30.0 72.682 3.060 -999.990 -999.990 0.727 ..P WKT 2010 06 24 18 34 55 31.3200 -97.3300 251.000 122.0 90.904 4.520 -999.990 -999.990 0.909 ..P WKT 2010 06 24 18 39 55 31.3200 -97.3300 251.000 457.0 83.954 2.900 -999.990 -999.990 0.840 ..P WKT 2010 06 24 18 49 55 31.3200 -97.3300 251.000 30.0 82.731 2.880 -999.990 -999.990 0.827 ..P WKT 2010 06 24 18 54 55 31.3200 -97.3300 251.000 122.0 87.763 2.840 -999.990 -999.990 0.878 ..P WKT 2010 06 24 18 59 55 31.3200 -97.3300 251.000 457.0 77.770 3.960 -999.990 -999.990 0.778 ..P WKT 2010 06 24 19 04 55 31.3200 -97.3300 251.000 30.0 76.402 3.520 -999.990 -999.990 0.764 ..P WKT 2010 06 24 19 09 55 31.3200 -97.3300 251.000 122.0 81.157 3.410 -999.990 -999.990 0.812 ..P WKT 2010 06 24 19 14 55 31.3200 -97.3300 251.000 457.0 75.058 4.580 -999.990 -999.990 0.751 ..P WKT 2010 06 24 19 24 55 31.3200 -97.3300 251.000 30.0 76.696 3.140 -999.990 -999.990 0.767 ..P WKT 2010 06 24 19 29 55 31.3200 -97.3300 251.000 122.0 87.496 4.230 -999.990 -999.990 0.875 ..P WKT 2010 06 24 19 34 55 31.3200 -97.3300 251.000 457.0 81.595 4.400 -999.990 -999.990 0.816 ..P WKT 2010 06 24 19 39 55 31.3200 -97.3300 251.000 30.0 81.539 3.080 -999.990 -999.990 0.815 ..P WKT 2010 06 24 19 44 55 31.3200 -97.3300 251.000 122.0 87.608 3.000 -999.990 -999.990 0.876 ..P WKT 2010 06 24 19 49 55 31.3200 -97.3300 251.000 457.0 87.553 3.200 -999.990 -999.990 0.876 ..P WKT 2010 06 24 19 59 55 31.3200 -97.3300 251.000 30.0 87.861 2.710 -999.990 -999.990 0.879 ..P WKT 2010 06 24 20 04 55 31.3200 -97.3300 251.000 122.0 89.894 3.610 -999.990 -999.990 0.899 ..P WKT 2010 06 24 20 09 55 31.3200 -97.3300 251.000 457.0 89.978 3.370 -999.990 -999.990 0.900 ..P WKT 2010 06 24 20 14 55 31.3200 -97.3300 251.000 30.0 83.657 3.850 -999.990 -999.990 0.837 ..P WKT 2010 06 24 20 19 55 31.3200 -97.3300 251.000 122.0 96.553 4.410 -999.990 -999.990 0.966 ..P WKT 2010 06 24 20 24 55 31.3200 -97.3300 251.000 457.0 97.473 2.940 -999.990 -999.990 0.975 ..P WKT 2010 06 24 20 34 55 31.3200 -97.3300 251.000 30.0 91.673 3.160 -999.990 -999.990 0.917 ..P WKT 2010 06 24 20 39 55 31.3200 -97.3300 251.000 122.0 96.374 3.680 -999.990 -999.990 0.964 ..P WKT 2010 06 24 20 44 55 31.3200 -97.3300 251.000 457.0 93.971 4.020 -999.990 -999.990 0.940 ..P WKT 2010 06 24 20 49 55 31.3200 -97.3300 251.000 30.0 93.657 3.490 -999.990 -999.990 0.937 ..P WKT 2010 06 24 20 54 55 31.3200 -97.3300 251.000 122.0 95.434 2.930 -999.990 -999.990 0.954 ..P WKT 2010 06 24 20 59 55 31.3200 -97.3300 251.000 457.0 89.825 3.620 -999.990 -999.990 0.898 ..P WKT 2010 06 24 21 09 55 31.3200 -97.3300 251.000 30.0 86.470 2.940 -999.990 -999.990 0.865 ..P WKT 2010 06 24 21 14 55 31.3200 -97.3300 251.000 122.0 90.397 3.430 -999.990 -999.990 0.904 ..P WKT 2010 06 24 21 19 55 31.3200 -97.3300 251.000 457.0 88.749 3.090 -999.990 -999.990 0.887 ..P WKT 2010 06 24 21 24 55 31.3200 -97.3300 251.000 30.0 93.791 2.870 -999.990 -999.990 0.938 ..P WKT 2010 06 24 21 29 55 31.3200 -97.3300 251.000 122.0 98.695 5.130 -999.990 -999.990 0.987 ..P WKT 2010 06 24 21 34 55 31.3200 -97.3300 251.000 457.0 95.653 4.200 -999.990 -999.990 0.957 ..P WKT 2010 06 24 21 44 55 31.3200 -97.3300 251.000 30.0 100.404 3.520 -999.990 -999.990 1.004 ..P WKT 2010 06 24 21 49 55 31.3200 -97.3300 251.000 122.0 100.668 2.710 -999.990 -999.990 1.007 ..P WKT 2010 06 24 21 54 55 31.3200 -97.3300 251.000 457.0 97.586 2.850 -999.990 -999.990 0.976 ..P WKT 2010 06 24 21 59 55 31.3200 -97.3300 251.000 30.0 99.106 3.980 -999.990 -999.990 0.991 ..P WKT 2010 06 24 22 04 55 31.3200 -97.3300 251.000 122.0 109.830 2.580 -999.990 -999.990 1.098 ..P WKT 2010 06 24 22 09 55 31.3200 -97.3300 251.000 457.0 92.102 2.990 -999.990 -999.990 0.921 ..P WKT 2010 06 24 22 19 55 31.3200 -97.3300 251.000 30.0 104.408 3.230 -999.990 -999.990 1.044 ..P WKT 2010 06 24 22 24 55 31.3200 -97.3300 251.000 122.0 110.312 4.340 -999.990 -999.990 1.103 ..P WKT 2010 06 24 22 29 55 31.3200 -97.3300 251.000 457.0 101.290 3.680 -999.990 -999.990 1.013 ..P WKT 2010 06 24 22 34 55 31.3200 -97.3300 251.000 30.0 103.289 3.740 -999.990 -999.990 1.033 ..P WKT 2010 06 24 22 39 55 31.3200 -97.3300 251.000 122.0 101.659 3.940 -999.990 -999.990 1.017 ..P WKT 2010 06 24 22 44 55 31.3200 -97.3300 251.000 457.0 97.519 4.480 -999.990 -999.990 0.975 ..P WKT 2010 06 24 22 54 55 31.3200 -97.3300 251.000 30.0 95.914 5.700 -999.990 -999.990 0.959 ..P WKT 2010 06 24 22 59 55 31.3200 -97.3300 251.000 122.0 92.868 4.820 -999.990 -999.990 0.929 ..P WKT 2010 06 24 23 04 55 31.3200 -97.3300 251.000 457.0 101.827 4.660 -999.990 -999.990 1.018 ..P WKT 2010 06 24 23 09 55 31.3200 -97.3300 251.000 30.0 93.756 5.090 -999.990 -999.990 0.938 ..P WKT 2010 06 24 23 14 55 31.3200 -97.3300 251.000 122.0 96.573 5.070 -999.990 -999.990 0.966 ..P WKT 2010 06 24 23 19 55 31.3200 -97.3300 251.000 457.0 105.532 5.730 -999.990 -999.990 1.055 ..P WKT 2010 06 24 23 29 55 31.3200 -97.3300 251.000 30.0 99.300 4.530 -999.990 -999.990 0.993 ..P WKT 2010 06 24 23 34 55 31.3200 -97.3300 251.000 122.0 100.583 3.910 -999.990 -999.990 1.006 ..P WKT 2010 06 24 23 39 55 31.3200 -97.3300 251.000 457.0 97.955 3.760 -999.990 -999.990 0.980 ..P WKT 2010 06 24 23 44 55 31.3200 -97.3300 251.000 30.0 100.633 4.670 -999.990 -999.990 1.006 ..P WKT 2010 06 24 23 49 55 31.3200 -97.3300 251.000 122.0 109.458 4.790 -999.990 -999.990 1.095 ..P WKT 2010 06 25 00 09 55 31.3200 -97.3300 251.000 457.0 99.735 2.980 -999.990 -999.990 0.997 ..P WKT 2010 06 25 00 10 25 31.3200 -97.3300 251.000 457.0 108.832 2.770 -999.990 -999.990 1.088 ..P WKT 2010 06 25 00 10 55 31.3200 -97.3300 251.000 457.0 107.871 2.850 -999.990 -999.990 1.079 ..P WKT 2010 06 25 00 11 25 31.3200 -97.3300 251.000 457.0 104.954 4.050 -999.990 -999.990 1.050 ..P WKT 2010 06 25 00 11 55 31.3200 -97.3300 251.000 457.0 102.317 3.500 -999.990 -999.990 1.023 ..P WKT 2010 06 25 00 12 25 31.3200 -97.3300 251.000 457.0 105.267 4.470 -999.990 -999.990 1.053 ..P WKT 2010 06 25 00 12 55 31.3200 -97.3300 251.000 457.0 103.188 4.630 -999.990 -999.990 1.032 ..P WKT 2010 06 25 00 13 25 31.3200 -97.3300 251.000 457.0 95.522 3.270 -999.990 -999.990 0.955 ..P WKT 2010 06 25 00 13 55 31.3200 -97.3300 251.000 457.0 98.473 3.670 -999.990 -999.990 0.985 ..P WKT 2010 06 25 00 14 25 31.3200 -97.3300 251.000 457.0 102.261 3.320 -999.990 -999.990 1.023 ..P WKT 2010 06 25 00 14 55 31.3200 -97.3300 251.000 457.0 94.315 4.020 -999.990 -999.990 0.943 ..P WKT 2010 06 25 00 19 55 31.3200 -97.3300 251.000 30.0 102.027 4.480 -999.990 -999.990 1.020 ..P WKT 2010 06 25 00 24 55 31.3200 -97.3300 251.000 122.0 103.033 4.700 -999.990 -999.990 1.030 ..P WKT 2010 06 25 00 29 55 31.3200 -97.3300 251.000 457.0 103.481 4.240 -999.990 -999.990 1.035 ..P WKT 2010 06 25 00 34 55 31.3200 -97.3300 251.000 30.0 90.377 3.490 -999.990 -999.990 0.904 ..P WKT 2010 06 25 00 39 55 31.3200 -97.3300 251.000 122.0 93.199 3.180 -999.990 -999.990 0.932 ..P WKT 2010 06 25 00 44 55 31.3200 -97.3300 251.000 457.0 99.654 3.320 -999.990 -999.990 0.997 ..P WKT 2010 06 25 00 54 55 31.3200 -97.3300 251.000 30.0 95.688 3.560 -999.990 -999.990 0.957 ..P WKT 2010 06 25 00 59 55 31.3200 -97.3300 251.000 122.0 90.995 3.950 -999.990 -999.990 0.910 ..P WKT 2010 06 25 01 04 55 31.3200 -97.3300 251.000 457.0 105.162 4.180 -999.990 -999.990 1.052 ..P WKT 2010 06 25 01 09 55 31.3200 -97.3300 251.000 30.0 94.882 3.530 -999.990 -999.990 0.949 ..P WKT 2010 06 25 01 14 55 31.3200 -97.3300 251.000 122.0 95.777 3.270 -999.990 -999.990 0.958 ..P WKT 2010 06 25 01 19 55 31.3200 -97.3300 251.000 457.0 96.672 2.820 -999.990 -999.990 0.967 ..P WKT 2010 06 25 01 29 55 31.3200 -97.3300 251.000 30.0 91.297 3.050 -999.990 -999.990 0.913 ..P WKT 2010 06 25 01 34 55 31.3200 -97.3300 251.000 122.0 95.227 3.470 -999.990 -999.990 0.952 ..P WKT 2010 06 25 01 39 55 31.3200 -97.3300 251.000 457.0 104.605 3.380 -999.990 -999.990 1.046 ..P WKT 2010 06 25 01 44 55 31.3200 -97.3300 251.000 30.0 95.401 3.530 -999.990 -999.990 0.954 ..P WKT 2010 06 25 01 49 55 31.3200 -97.3300 251.000 122.0 92.624 3.780 -999.990 -999.990 0.926 ..P WKT 2010 06 25 01 54 55 31.3200 -97.3300 251.000 457.0 101.723 3.840 -999.990 -999.990 1.017 ..P WKT 2010 06 25 02 04 55 31.3200 -97.3300 251.000 30.0 100.559 3.320 -999.990 -999.990 1.006 ..P WKT 2010 06 25 02 09 55 31.3200 -97.3300 251.000 122.0 93.091 3.010 -999.990 -999.990 0.931 ..P WKT 2010 06 25 02 14 55 31.3200 -97.3300 251.000 457.0 111.333 3.010 -999.990 -999.990 1.113 ..P WKT 2010 06 25 02 19 55 31.3200 -97.3300 251.000 30.0 104.843 3.390 -999.990 -999.990 1.048 ..P WKT 2010 06 25 02 24 55 31.3200 -97.3300 251.000 122.0 99.890 3.640 -999.990 -999.990 0.999 ..P WKT 2010 06 25 02 29 55 31.3200 -97.3300 251.000 457.0 105.836 2.360 -999.990 -999.990 1.058 ..P WKT 2010 06 25 02 39 55 31.3200 -97.3300 251.000 30.0 109.064 2.650 -999.990 -999.990 1.091 ..P WKT 2010 06 25 02 44 55 31.3200 -97.3300 251.000 122.0 101.037 4.050 -999.990 -999.990 1.010 ..P WKT 2010 06 25 02 49 55 31.3200 -97.3300 251.000 457.0 117.044 2.360 -999.990 -999.990 1.170 ..P WKT 2010 06 25 02 54 55 31.3200 -97.3300 251.000 30.0 112.091 2.760 -999.990 -999.990 1.121 ..P WKT 2010 06 25 02 59 55 31.3200 -97.3300 251.000 122.0 96.796 2.240 -999.990 -999.990 0.968 ..P WKT 2010 06 25 03 04 55 31.3200 -97.3300 251.000 457.0 98.270 3.300 -999.990 -999.990 0.983 ..P WKT 2010 06 25 03 14 55 31.3200 -97.3300 251.000 30.0 102.976 3.780 -999.990 -999.990 1.030 ..P WKT 2010 06 25 03 19 55 31.3200 -97.3300 251.000 122.0 98.382 2.910 -999.990 -999.990 0.984 ..P WKT 2010 06 25 03 24 55 31.3200 -97.3300 251.000 457.0 101.893 2.830 -999.990 -999.990 1.019 ..P WKT 2010 06 25 03 29 55 31.3200 -97.3300 251.000 30.0 100.932 3.480 -999.990 -999.990 1.009 ..P WKT 2010 06 25 03 34 55 31.3200 -97.3300 251.000 122.0 132.114 3.650 -999.990 -999.990 1.321 ..P WKT 2010 06 25 03 39 55 31.3200 -97.3300 251.000 457.0 111.308 2.930 -999.990 -999.990 1.113 ..P WKT 2010 06 25 03 49 55 31.3200 -97.3300 251.000 30.0 103.916 4.510 -999.990 -999.990 1.039 ..P WKT 2010 06 25 03 54 55 31.3200 -97.3300 251.000 122.0 113.697 4.330 -999.990 -999.990 1.137 ..P WKT 2010 06 25 03 59 55 31.3200 -97.3300 251.000 457.0 81.550 4.320 -999.990 -999.990 0.816 ..P WKT 2010 06 25 04 04 55 31.3200 -97.3300 251.000 30.0 100.554 4.190 -999.990 -999.990 1.006 ..P WKT 2010 06 25 04 09 55 31.3200 -97.3300 251.000 122.0 109.775 4.060 -999.990 -999.990 1.098 ..P WKT 2010 06 25 04 14 55 31.3200 -97.3300 251.000 457.0 78.466 4.100 -999.990 -999.990 0.785 ..P WKT 2010 06 25 04 24 55 31.3200 -97.3300 251.000 30.0 93.755 4.010 -999.990 -999.990 0.938 ..P WKT 2010 06 25 04 29 55 31.3200 -97.3300 251.000 122.0 124.840 4.080 -999.990 -999.990 1.248 ..P WKT 2010 06 25 04 34 55 31.3200 -97.3300 251.000 457.0 80.730 4.650 -999.990 -999.990 0.807 ..P WKT 2010 06 25 04 39 55 31.3200 -97.3300 251.000 30.0 95.742 3.340 -999.990 -999.990 0.957 ..P WKT 2010 06 25 04 44 55 31.3200 -97.3300 251.000 122.0 94.122 3.650 -999.990 -999.990 0.941 ..P WKT 2010 06 25 04 49 55 31.3200 -97.3300 251.000 457.0 81.460 3.150 -999.990 -999.990 0.815 ..P WKT 2010 06 25 05 04 55 31.3200 -97.3300 251.000 30.0 94.790 3.870 -999.990 -999.990 0.948 ..P WKT 2010 06 25 05 09 55 31.3200 -97.3300 251.000 122.0 89.266 3.230 -999.990 -999.990 0.893 ..P WKT 2010 06 25 05 14 55 31.3200 -97.3300 251.000 457.0 87.096 3.460 -999.990 -999.990 0.871 ..P WKT 2010 06 25 05 19 55 31.3200 -97.3300 251.000 30.0 105.475 3.910 -999.990 -999.990 1.055 ..P WKT 2010 06 25 05 24 55 31.3200 -97.3300 251.000 122.0 95.198 5.860 -999.990 -999.990 0.952 ..P WKT 2010 06 25 05 29 55 31.3200 -97.3300 251.000 457.0 80.028 4.450 -999.990 -999.990 0.800 ..P WKT 2010 06 25 05 39 55 31.3200 -97.3300 251.000 30.0 97.985 3.860 -999.990 -999.990 0.980 ..P WKT 2010 06 25 05 44 55 31.3200 -97.3300 251.000 122.0 99.800 4.360 -999.990 -999.990 0.998 ..P WKT 2010 06 25 05 49 55 31.3200 -97.3300 251.000 457.0 86.796 4.110 -999.990 -999.990 0.868 ..P WKT 2010 06 25 05 54 55 31.3200 -97.3300 251.000 30.0 102.870 4.020 -999.990 -999.990 1.029 ..P WKT 2010 06 25 05 59 55 31.3200 -97.3300 251.000 122.0 101.190 3.930 -999.990 -999.990 1.012 ..P WKT 2010 06 25 06 04 55 31.3200 -97.3300 251.000 457.0 89.025 3.570 -999.990 -999.990 0.890 ..P WKT 2010 06 25 06 14 55 31.3200 -97.3300 251.000 30.0 96.309 2.870 -999.990 -999.990 0.963 ..P WKT 2010 06 25 06 19 55 31.3200 -97.3300 251.000 122.0 104.574 3.340 -999.990 -999.990 1.046 ..P WKT 2010 06 25 06 24 55 31.3200 -97.3300 251.000 457.0 93.967 2.540 -999.990 -999.990 0.940 ..P WKT 2010 06 25 06 29 55 31.3200 -97.3300 251.000 30.0 99.436 2.810 -999.990 -999.990 0.994 ..P WKT 2010 06 25 06 34 55 31.3200 -97.3300 251.000 122.0 190.188 3.350 -999.990 -999.990 1.902 ..P WKT 2010 06 25 06 39 55 31.3200 -97.3300 251.000 457.0 88.845 4.070 -999.990 -999.990 0.888 ..P WKT 2010 06 25 06 49 55 31.3200 -97.3300 251.000 30.0 99.425 3.910 -999.990 -999.990 0.994 ..P WKT 2010 06 25 06 54 55 31.3200 -97.3300 251.000 122.0 101.180 3.990 -999.990 -999.990 1.012 ..P WKT 2010 06 25 06 59 55 31.3200 -97.3300 251.000 457.0 90.352 3.200 -999.990 -999.990 0.904 ..P WKT 2010 06 25 07 04 55 31.3200 -97.3300 251.000 30.0 102.173 3.540 -999.990 -999.990 1.022 ..P WKT 2010 06 25 07 09 55 31.3200 -97.3300 251.000 122.0 95.819 3.330 -999.990 -999.990 0.958 ..P WKT 2010 06 25 07 14 55 31.3200 -97.3300 251.000 457.0 95.337 2.370 -999.990 -999.990 0.953 ..P WKT 2010 06 25 07 24 55 31.3200 -97.3300 251.000 30.0 102.561 2.770 -999.990 -999.990 1.026 ..P WKT 2010 06 25 07 29 55 31.3200 -97.3300 251.000 122.0 99.643 3.160 -999.990 -999.990 0.996 ..P WKT 2010 06 25 07 34 55 31.3200 -97.3300 251.000 457.0 87.495 3.130 -999.990 -999.990 0.875 ..P WKT 2010 06 25 07 39 55 31.3200 -97.3300 251.000 30.0 110.863 3.780 -999.990 -999.990 1.109 ..P WKT 2010 06 25 07 44 55 31.3200 -97.3300 251.000 122.0 95.919 3.720 -999.990 -999.990 0.959 ..P WKT 2010 06 25 07 49 55 31.3200 -97.3300 251.000 457.0 74.822 3.370 -999.990 -999.990 0.748 ..P WKT 2010 06 25 07 59 55 31.3200 -97.3300 251.000 30.0 106.558 3.230 -999.990 -999.990 1.066 ..P WKT 2010 06 25 08 04 55 31.3200 -97.3300 251.000 122.0 95.068 3.660 -999.990 -999.990 0.951 ..P WKT 2010 06 25 08 09 55 31.3200 -97.3300 251.000 457.0 86.936 4.310 -999.990 -999.990 0.869 ..P WKT 2010 06 25 08 14 55 31.3200 -97.3300 251.000 30.0 109.567 3.010 -999.990 -999.990 1.096 ..P WKT 2010 06 25 08 19 55 31.3200 -97.3300 251.000 122.0 103.391 3.350 -999.990 -999.990 1.034 ..P WKT 2010 06 25 08 24 55 31.3200 -97.3300 251.000 457.0 78.197 2.670 -999.990 -999.990 0.782 ..P WKT 2010 06 25 08 34 55 31.3200 -97.3300 251.000 30.0 112.433 3.940 -999.990 -999.990 1.124 ..P WKT 2010 06 25 08 39 55 31.3200 -97.3300 251.000 122.0 114.108 3.060 -999.990 -999.990 1.141 ..P WKT 2010 06 25 08 44 55 31.3200 -97.3300 251.000 457.0 83.759 3.030 -999.990 -999.990 0.838 ..P WKT 2010 06 25 08 49 55 31.3200 -97.3300 251.000 30.0 117.180 3.820 -999.990 -999.990 1.172 ..P WKT 2010 06 25 08 54 55 31.3200 -97.3300 251.000 122.0 107.387 3.470 -999.990 -999.990 1.074 ..P WKT 2010 06 25 08 59 55 31.3200 -97.3300 251.000 457.0 87.386 4.070 -999.990 -999.990 0.874 ..P WKT 2010 06 25 09 09 55 31.3200 -97.3300 251.000 30.0 117.669 4.100 -999.990 -999.990 1.177 ..P WKT 2010 06 25 09 14 55 31.3200 -97.3300 251.000 122.0 115.928 3.680 -999.990 -999.990 1.159 ..P WKT 2010 06 25 09 19 55 31.3200 -97.3300 251.000 457.0 80.482 2.990 -999.990 -999.990 0.805 ..P WKT 2010 06 25 09 24 55 31.3200 -97.3300 251.000 30.0 118.880 3.920 -999.990 -999.990 1.189 ..P WKT 2010 06 25 09 29 55 31.3200 -97.3300 251.000 122.0 107.908 3.580 -999.990 -999.990 1.079 ..P WKT 2010 06 25 09 34 55 31.3200 -97.3300 251.000 457.0 82.951 2.700 -999.990 -999.990 0.830 ..P WKT 2010 06 25 09 44 55 31.3200 -97.3300 251.000 30.0 115.913 2.870 -999.990 -999.990 1.159 ..P WKT 2010 06 25 09 49 55 31.3200 -97.3300 251.000 122.0 100.825 3.650 -999.990 -999.990 1.008 ..P WKT 2010 06 25 09 54 55 31.3200 -97.3300 251.000 457.0 75.946 3.030 -999.990 -999.990 0.759 ..P WKT 2010 06 25 09 59 55 31.3200 -97.3300 251.000 30.0 113.448 4.500 -999.990 -999.990 1.134 ..P WKT 2010 06 25 10 04 55 31.3200 -97.3300 251.000 122.0 104.793 3.160 -999.990 -999.990 1.048 ..P WKT 2010 06 25 10 09 55 31.3200 -97.3300 251.000 457.0 73.480 3.030 -999.990 -999.990 0.735 ..P WKT 2010 06 25 10 19 55 31.3200 -97.3300 251.000 30.0 113.177 3.760 -999.990 -999.990 1.132 ..P WKT 2010 06 25 10 24 55 31.3200 -97.3300 251.000 122.0 109.218 2.880 -999.990 -999.990 1.092 ..P WKT 2010 06 25 10 29 55 31.3200 -97.3300 251.000 457.0 75.885 2.950 -999.990 -999.990 0.759 ..P WKT 2010 06 25 10 34 55 31.3200 -97.3300 251.000 30.0 116.687 2.870 -999.990 -999.990 1.167 ..P WKT 2010 06 25 10 39 55 31.3200 -97.3300 251.000 122.0 114.965 2.830 -999.990 -999.990 1.150 ..P WKT 2010 06 25 10 44 55 31.3200 -97.3300 251.000 457.0 75.756 2.670 -999.990 -999.990 0.758 ..P WKT 2010 06 25 10 54 55 31.3200 -97.3300 251.000 30.0 114.438 3.280 -999.990 -999.990 1.144 ..P WKT 2010 06 25 10 59 55 31.3200 -97.3300 251.000 122.0 111.757 2.630 -999.990 -999.990 1.118 ..P WKT 2010 06 25 11 04 55 31.3200 -97.3300 251.000 457.0 80.540 2.860 -999.990 -999.990 0.805 ..P WKT 2010 06 25 11 09 55 31.3200 -97.3300 251.000 30.0 109.195 3.710 -999.990 -999.990 1.092 ..P WKT 2010 06 25 11 14 55 31.3200 -97.3300 251.000 122.0 116.586 3.630 -999.990 -999.990 1.166 ..P WKT 2010 06 25 11 19 55 31.3200 -97.3300 251.000 457.0 78.093 3.790 -999.990 -999.990 0.781 ..P WKT 2010 06 25 11 29 55 31.3200 -97.3300 251.000 30.0 118.881 4.280 -999.990 -999.990 1.189 ..P WKT 2010 06 25 11 34 55 31.3200 -97.3300 251.000 122.0 102.756 4.360 -999.990 -999.990 1.028 ..P WKT 2010 06 25 11 39 55 31.3200 -97.3300 251.000 457.0 81.034 3.980 -999.990 -999.990 0.810 ..P WKT 2010 06 25 11 44 55 31.3200 -97.3300 251.000 30.0 111.354 4.380 -999.990 -999.990 1.114 ..P WKT 2010 06 25 11 49 55 31.3200 -97.3300 251.000 122.0 108.658 4.070 -999.990 -999.990 1.087 ..P WKT 2010 06 25 12 09 55 31.3200 -97.3300 251.000 457.0 76.498 4.040 -999.990 -999.990 0.765 ..P WKT 2010 06 25 12 10 25 31.3200 -97.3300 251.000 457.0 75.936 3.830 -999.990 -999.990 0.759 ..P WKT 2010 06 25 12 10 55 31.3200 -97.3300 251.000 457.0 80.692 4.260 -999.990 -999.990 0.807 ..P WKT 2010 06 25 12 11 25 31.3200 -97.3300 251.000 457.0 73.136 5.320 -999.990 -999.990 0.731 ..P WKT 2010 06 25 12 11 55 31.3200 -97.3300 251.000 457.0 73.693 3.770 -999.990 -999.990 0.737 ..P WKT 2010 06 25 12 12 25 31.3200 -97.3300 251.000 457.0 70.334 4.230 -999.990 -999.990 0.703 ..P WKT 2010 06 25 12 12 55 31.3200 -97.3300 251.000 457.0 75.369 3.700 -999.990 -999.990 0.754 ..P WKT 2010 06 25 12 13 25 31.3200 -97.3300 251.000 457.0 75.367 3.940 -999.990 -999.990 0.754 ..P WKT 2010 06 25 12 13 55 31.3200 -97.3300 251.000 457.0 75.365 5.410 -999.990 -999.990 0.754 ..P WKT 2010 06 25 12 14 25 31.3200 -97.3300 251.000 457.0 77.882 5.190 -999.990 -999.990 0.779 ..P WKT 2010 06 25 12 14 55 31.3200 -97.3300 251.000 457.0 74.663 4.710 -999.990 -999.990 0.747 ..P WKT 2010 06 25 12 19 55 31.3200 -97.3300 251.000 30.0 118.572 4.590 -999.990 -999.990 1.186 ..P WKT 2010 06 25 12 24 55 31.3200 -97.3300 251.000 122.0 104.148 3.690 -999.990 -999.990 1.041 ..P WKT 2010 06 25 12 29 55 31.3200 -97.3300 251.000 457.0 76.434 3.690 -999.990 -999.990 0.764 ..P WKT 2010 06 25 12 34 55 31.3200 -97.3300 251.000 30.0 116.983 4.160 -999.990 -999.990 1.170 ..P WKT 2010 06 25 12 39 55 31.3200 -97.3300 251.000 122.0 106.335 3.520 -999.990 -999.990 1.063 ..P WKT 2010 06 25 12 44 55 31.3200 -97.3300 251.000 457.0 79.463 3.660 -999.990 -999.990 0.795 ..P WKT 2010 06 25 12 54 55 31.3200 -97.3300 251.000 30.0 105.682 3.260 -999.990 -999.990 1.057 ..P WKT 2010 06 25 12 59 55 31.3200 -97.3300 251.000 122.0 105.201 3.300 -999.990 -999.990 1.052 ..P WKT 2010 06 25 13 04 55 31.3200 -97.3300 251.000 457.0 84.161 3.230 -999.990 -999.990 0.842 ..P WKT 2010 06 25 13 09 55 31.3200 -97.3300 251.000 30.0 102.142 4.210 -999.990 -999.990 1.021 ..P WKT 2010 06 25 13 14 55 31.3200 -97.3300 251.000 122.0 102.501 3.790 -999.990 -999.990 1.025 ..P WKT 2010 06 25 13 19 55 31.3200 -97.3300 251.000 457.0 77.267 3.290 -999.990 -999.990 0.773 ..P WKT 2010 06 25 13 29 55 31.3200 -97.3300 251.000 30.0 112.128 3.120 -999.990 -999.990 1.121 ..P WKT 2010 06 25 13 34 55 31.3200 -97.3300 251.000 122.0 112.366 2.680 -999.990 -999.990 1.124 ..P WKT 2010 06 25 13 39 55 31.3200 -97.3300 251.000 457.0 81.560 2.870 -999.990 -999.990 0.816 ..P WKT 2010 06 25 13 44 55 31.3200 -97.3300 251.000 30.0 113.962 3.250 -999.990 -999.990 1.140 ..P WKT 2010 06 25 13 49 55 31.3200 -97.3300 251.000 122.0 107.768 3.330 -999.990 -999.990 1.078 ..P WKT 2010 06 25 13 54 55 31.3200 -97.3300 251.000 457.0 85.354 3.680 -999.990 -999.990 0.854 ..P WKT 2010 06 25 14 04 55 31.3200 -97.3300 251.000 30.0 102.731 4.280 -999.990 -999.990 1.027 ..P WKT 2010 06 25 14 09 55 31.3200 -97.3300 251.000 122.0 102.111 2.860 -999.990 -999.990 1.021 ..P WKT 2010 06 25 14 14 55 31.3200 -97.3300 251.000 457.0 67.515 4.370 -999.990 -999.990 0.675 ..P WKT 2010 06 25 14 19 55 31.3200 -97.3300 251.000 30.0 94.858 5.510 -999.990 -999.990 0.949 ..P WKT 2010 06 25 14 24 55 31.3200 -97.3300 251.000 122.0 96.475 4.790 -999.990 -999.990 0.965 ..P WKT 2010 06 25 14 29 55 31.3200 -97.3300 251.000 457.0 67.335 3.740 -999.990 -999.990 0.673 ..P WKT 2010 06 25 14 39 55 31.3200 -97.3300 251.000 30.0 97.232 3.360 -999.990 -999.990 0.972 ..P WKT 2010 06 25 14 44 55 31.3200 -97.3300 251.000 122.0 100.626 5.610 -999.990 -999.990 1.006 ..P WKT 2010 06 25 14 49 55 31.3200 -97.3300 251.000 457.0 97.590 5.510 -999.990 -999.990 0.976 ..P WKT 2010 06 25 14 54 55 31.3200 -97.3300 251.000 30.0 91.478 4.980 -999.990 -999.990 0.915 ..P WKT 2010 06 25 14 59 55 31.3200 -97.3300 251.000 122.0 97.947 3.310 -999.990 -999.990 0.979 ..P WKT 2010 06 25 15 04 55 31.3200 -97.3300 251.000 457.0 81.771 5.410 -999.990 -999.990 0.818 ..P WKT 2010 06 25 15 14 55 31.3200 -97.3300 251.000 30.0 85.763 3.580 -999.990 -999.990 0.858 ..P WKT 2010 06 25 15 19 55 31.3200 -97.3300 251.000 122.0 96.706 3.160 -999.990 -999.990 0.967 ..P WKT 2010 06 25 15 24 55 31.3200 -97.3300 251.000 457.0 90.594 4.810 -999.990 -999.990 0.906 ..P WKT 2010 06 25 15 29 55 31.3200 -97.3300 251.000 30.0 101.536 3.240 -999.990 -999.990 1.015 ..P WKT 2010 06 25 15 34 55 31.3200 -97.3300 251.000 122.0 106.886 3.120 -999.990 -999.990 1.069 ..P WKT 2010 06 25 15 39 55 31.3200 -97.3300 251.000 457.0 97.980 2.780 -999.990 -999.990 0.980 ..P WKT 2010 06 25 15 49 55 31.3200 -97.3300 251.000 30.0 102.251 2.750 -999.990 -999.990 1.023 ..P WKT 2010 06 25 15 54 55 31.3200 -97.3300 251.000 122.0 102.569 2.910 -999.990 -999.990 1.026 ..P WKT 2010 06 25 15 59 55 31.3200 -97.3300 251.000 457.0 92.546 4.120 -999.990 -999.990 0.925 ..P WKT 2010 06 25 16 04 55 31.3200 -97.3300 251.000 30.0 95.939 2.790 -999.990 -999.990 0.959 ..P WKT 2010 06 25 16 09 55 31.3200 -97.3300 251.000 122.0 98.773 2.870 -999.990 -999.990 0.988 ..P WKT 2010 06 25 16 14 55 31.3200 -97.3300 251.000 457.0 89.589 3.190 -999.990 -999.990 0.896 ..P WKT 2010 06 25 16 24 55 31.3200 -97.3300 251.000 30.0 94.678 3.810 -999.990 -999.990 0.947 ..P WKT 2010 06 25 16 29 55 31.3200 -97.3300 251.000 122.0 99.728 4.170 -999.990 -999.990 0.997 ..P WKT 2010 06 25 16 34 55 31.3200 -97.3300 251.000 457.0 93.319 3.350 -999.990 -999.990 0.933 ..P WKT 2010 06 25 16 39 55 31.3200 -97.3300 251.000 30.0 88.308 3.660 -999.990 -999.990 0.883 ..P WKT 2010 06 25 16 44 55 31.3200 -97.3300 251.000 122.0 92.100 4.050 -999.990 -999.990 0.921 ..P WKT 2010 06 25 16 49 55 31.3200 -97.3300 251.000 457.0 93.517 5.370 -999.990 -999.990 0.935 ..P WKT 2010 06 25 17 04 55 31.3200 -97.3300 251.000 30.0 87.561 4.080 -999.990 -999.990 0.876 ..P WKT 2010 06 25 17 09 55 31.3200 -97.3300 251.000 122.0 99.453 4.380 -999.990 -999.990 0.995 ..P WKT 2010 06 25 17 14 55 31.3200 -97.3300 251.000 457.0 87.036 4.780 -999.990 -999.990 0.870 ..P WKT 2010 06 25 17 19 55 31.3200 -97.3300 251.000 30.0 82.723 4.780 -999.990 -999.990 0.827 ..P WKT 2010 06 25 17 24 55 31.3200 -97.3300 251.000 122.0 93.915 4.710 -999.990 -999.990 0.939 ..P WKT 2010 06 25 17 29 55 31.3200 -97.3300 251.000 457.0 88.484 6.510 -999.990 -999.990 0.885 ..P WKT 2010 06 25 17 39 55 31.3200 -97.3300 251.000 30.0 88.600 5.480 -999.990 -999.990 0.886 ..P WKT 2010 06 25 17 44 55 31.3200 -97.3300 251.000 122.0 99.175 4.510 -999.990 -999.990 0.992 ..P WKT 2010 06 25 17 49 55 31.3200 -97.3300 251.000 457.0 93.407 4.650 -999.990 -999.990 0.934 ..P WKT 2010 06 25 17 54 55 31.3200 -97.3300 251.000 30.0 90.014 4.060 -999.990 -999.990 0.900 ..P WKT 2010 06 25 17 59 55 31.3200 -97.3300 251.000 122.0 93.186 4.710 -999.990 -999.990 0.932 ..P WKT 2010 06 25 18 04 55 31.3200 -97.3300 251.000 457.0 94.262 3.970 -999.990 -999.990 0.943 ..P WKT 2010 06 25 18 14 55 31.3200 -97.3300 251.000 30.0 97.194 3.410 -999.990 -999.990 0.972 ..P WKT 2010 06 25 18 19 55 31.3200 -97.3300 251.000 122.0 95.976 5.990 -999.990 -999.990 0.960 ..P WKT 2010 06 25 18 24 55 31.3200 -97.3300 251.000 457.0 96.713 3.060 -999.990 -999.990 0.967 ..P WKT 2010 06 25 18 29 55 31.3200 -97.3300 251.000 30.0 100.244 3.050 -999.990 -999.990 1.002 ..P WKT 2010 06 25 18 34 55 31.3200 -97.3300 251.000 122.0 99.864 4.270 -999.990 -999.990 0.999 ..P WKT 2010 06 25 18 39 55 31.3200 -97.3300 251.000 457.0 96.691 2.840 -999.990 -999.990 0.967 ..P WKT 2010 06 25 18 49 55 31.3200 -97.3300 251.000 30.0 100.021 3.370 -999.990 -999.990 1.000 ..P WKT 2010 06 25 18 54 55 31.3200 -97.3300 251.000 122.0 104.009 3.450 -999.990 -999.990 1.040 ..P WKT 2010 06 25 18 59 55 31.3200 -97.3300 251.000 457.0 91.800 2.930 -999.990 -999.990 0.918 ..P WKT 2010 06 25 19 04 55 31.3200 -97.3300 251.000 30.0 95.789 3.200 -999.990 -999.990 0.958 ..P WKT 2010 06 25 19 09 55 31.3200 -97.3300 251.000 122.0 100.615 3.010 -999.990 -999.990 1.006 ..P WKT 2010 06 25 19 14 55 31.3200 -97.3300 251.000 457.0 92.875 3.260 -999.990 -999.990 0.929 ..P WKT 2010 06 25 19 24 55 31.3200 -97.3300 251.000 30.0 99.057 2.630 -999.990 -999.990 0.991 ..P WKT 2010 06 25 19 29 55 31.3200 -97.3300 251.000 122.0 102.088 2.840 -999.990 -999.990 1.021 ..P WKT 2010 06 25 19 34 55 31.3200 -97.3300 251.000 457.0 97.020 4.020 -999.990 -999.990 0.970 ..P WKT 2010 06 25 19 39 55 31.3200 -97.3300 251.000 30.0 91.396 3.830 -999.990 -999.990 0.914 ..P WKT 2010 06 25 19 44 55 31.3200 -97.3300 251.000 122.0 93.868 3.010 -999.990 -999.990 0.939 ..P WKT 2010 06 25 19 49 55 31.3200 -97.3300 251.000 457.0 91.594 3.350 -999.990 -999.990 0.916 ..P WKT 2010 06 25 19 59 55 31.3200 -97.3300 251.000 30.0 86.626 3.680 -999.990 -999.990 0.866 ..P WKT 2010 06 25 20 04 55 31.3200 -97.3300 251.000 122.0 90.913 2.850 -999.990 -999.990 0.909 ..P WKT 2010 06 25 20 09 55 31.3200 -97.3300 251.000 457.0 91.850 4.190 -999.990 -999.990 0.918 ..P WKT 2010 06 25 20 14 55 31.3200 -97.3300 251.000 30.0 87.482 3.550 -999.990 -999.990 0.875 ..P WKT 2010 06 25 20 19 55 31.3200 -97.3300 251.000 122.0 89.116 3.970 -999.990 -999.990 0.891 ..P WKT 2010 06 25 20 24 55 31.3200 -97.3300 251.000 457.0 81.259 2.970 -999.990 -999.990 0.813 ..P WKT 2010 06 25 20 34 55 31.3200 -97.3300 251.000 30.0 84.747 4.250 -999.990 -999.990 0.847 ..P WKT 2010 06 25 20 39 55 31.3200 -97.3300 251.000 122.0 92.743 3.660 -999.990 -999.990 0.927 ..P WKT 2010 06 25 20 44 55 31.3200 -97.3300 251.000 457.0 81.895 3.640 -999.990 -999.990 0.819 ..P WKT 2010 06 25 20 49 55 31.3200 -97.3300 251.000 30.0 86.121 3.390 -999.990 -999.990 0.861 ..P WKT 2010 06 25 20 54 55 31.3200 -97.3300 251.000 122.0 90.905 3.400 -999.990 -999.990 0.909 ..P WKT 2010 06 25 20 59 55 31.3200 -97.3300 251.000 457.0 84.246 3.360 -999.990 -999.990 0.842 ..P WKT 2010 06 25 21 09 55 31.3200 -97.3300 251.000 30.0 84.284 4.400 -999.990 -999.990 0.843 ..P WKT 2010 06 25 21 14 55 31.3200 -97.3300 251.000 122.0 94.890 4.200 -999.990 -999.990 0.949 ..P WKT 2010 06 25 21 19 55 31.3200 -97.3300 251.000 457.0 84.144 3.530 -999.990 -999.990 0.841 ..P WKT 2010 06 25 21 24 55 31.3200 -97.3300 251.000 30.0 81.492 3.720 -999.990 -999.990 0.815 ..P WKT 2010 06 25 21 29 55 31.3200 -97.3300 251.000 122.0 87.771 3.580 -999.990 -999.990 0.878 ..P WKT 2010 06 25 21 34 55 31.3200 -97.3300 251.000 457.0 85.398 3.790 -999.990 -999.990 0.854 ..P WKT 2010 06 25 21 44 55 31.3200 -97.3300 251.000 30.0 82.746 3.540 -999.990 -999.990 0.827 ..P WKT 2010 06 25 21 49 55 31.3200 -97.3300 251.000 122.0 88.047 5.430 -999.990 -999.990 0.880 ..P WKT 2010 06 25 21 54 55 31.3200 -97.3300 251.000 457.0 80.792 3.810 -999.990 -999.990 0.808 ..P WKT 2010 06 25 21 59 55 31.3200 -97.3300 251.000 30.0 82.884 3.800 -999.990 -999.990 0.829 ..P WKT 2010 06 25 22 04 55 31.3200 -97.3300 251.000 122.0 86.511 4.430 -999.990 -999.990 0.865 ..P WKT 2010 06 25 22 09 55 31.3200 -97.3300 251.000 457.0 81.347 3.300 -999.990 -999.990 0.813 ..P WKT 2010 06 25 22 19 55 31.3200 -97.3300 251.000 30.0 78.935 3.090 -999.990 -999.990 0.789 ..P WKT 2010 06 25 22 24 55 31.3200 -97.3300 251.000 122.0 88.381 2.970 -999.990 -999.990 0.884 ..P WKT 2010 06 25 22 29 55 31.3200 -97.3300 251.000 457.0 81.923 4.930 -999.990 -999.990 0.819 ..P WKT 2010 06 25 22 34 55 31.3200 -97.3300 251.000 30.0 83.557 4.370 -999.990 -999.990 0.836 ..P WKT 2010 06 25 22 39 55 31.3200 -97.3300 251.000 122.0 95.234 3.750 -999.990 -999.990 0.952 ..P WKT 2010 06 25 22 44 55 31.3200 -97.3300 251.000 457.0 83.755 4.130 -999.990 -999.990 0.838 ..P WKT 2010 06 25 22 54 55 31.3200 -97.3300 251.000 30.0 86.823 3.880 -999.990 -999.990 0.868 ..P WKT 2010 06 25 22 59 55 31.3200 -97.3300 251.000 122.0 94.395 2.670 -999.990 -999.990 0.944 ..P WKT 2010 06 25 23 04 55 31.3200 -97.3300 251.000 457.0 88.576 3.730 -999.990 -999.990 0.886 ..P WKT 2010 06 25 23 09 55 31.3200 -97.3300 251.000 30.0 84.988 2.610 -999.990 -999.990 0.850 ..P WKT 2010 06 25 23 14 55 31.3200 -97.3300 251.000 122.0 95.069 4.420 -999.990 -999.990 0.951 ..P WKT 2010 06 25 23 19 55 31.3200 -97.3300 251.000 457.0 88.693 3.970 -999.990 -999.990 0.887 ..P WKT 2010 06 25 23 29 55 31.3200 -97.3300 251.000 30.0 90.300 2.950 -999.990 -999.990 0.903 ..P WKT 2010 06 25 23 34 55 31.3200 -97.3300 251.000 122.0 87.963 3.010 -999.990 -999.990 0.880 ..P WKT 2010 06 25 23 39 55 31.3200 -97.3300 251.000 457.0 89.532 2.900 -999.990 -999.990 0.895 ..P WKT 2010 06 25 23 44 55 31.3200 -97.3300 251.000 30.0 96.958 2.950 -999.990 -999.990 0.970 ..P WKT 2010 06 25 23 49 55 31.3200 -97.3300 251.000 122.0 95.178 2.960 -999.990 -999.990 0.952 ..P WKT 2010 06 26 00 09 55 31.3200 -97.3300 251.000 457.0 95.244 2.890 -999.990 -999.990 0.952 ..P WKT 2010 06 26 00 10 25 31.3200 -97.3300 251.000 457.0 90.331 4.870 -999.990 -999.990 0.903 ..P WKT 2010 06 26 00 10 55 31.3200 -97.3300 251.000 457.0 91.974 4.040 -999.990 -999.990 0.920 ..P WKT 2010 06 26 00 11 25 31.3200 -97.3300 251.000 457.0 91.524 3.040 -999.990 -999.990 0.915 ..P WKT 2010 06 26 00 11 55 31.3200 -97.3300 251.000 457.0 89.123 2.780 -999.990 -999.990 0.891 ..P WKT 2010 06 26 00 12 25 31.3200 -97.3300 251.000 457.0 89.649 2.690 -999.990 -999.990 0.896 ..P WKT 2010 06 26 00 12 55 31.3200 -97.3300 251.000 457.0 88.642 2.940 -999.990 -999.990 0.886 ..P WKT 2010 06 26 00 13 25 31.3200 -97.3300 251.000 457.0 91.260 3.320 -999.990 -999.990 0.913 ..P WKT 2010 06 26 00 13 55 31.3200 -97.3300 251.000 457.0 89.556 4.040 -999.990 -999.990 0.896 ..P WKT 2010 06 26 00 14 25 31.3200 -97.3300 251.000 457.0 88.130 3.750 -999.990 -999.990 0.881 ..P WKT 2010 06 26 00 14 55 31.3200 -97.3300 251.000 457.0 90.887 2.700 -999.990 -999.990 0.909 ..P WKT 2010 06 26 00 19 55 31.3200 -97.3300 251.000 30.0 88.345 3.410 -999.990 -999.990 0.883 ..P WKT 2010 06 26 00 24 55 31.3200 -97.3300 251.000 122.0 99.188 6.040 -999.990 -999.990 0.992 ..P WKT 2010 06 26 00 29 55 31.3200 -97.3300 251.000 457.0 91.624 3.510 -999.990 -999.990 0.916 ..P WKT 2010 06 26 00 34 55 31.3200 -97.3300 251.000 30.0 89.779 3.170 -999.990 -999.990 0.898 ..P WKT 2010 06 26 00 39 55 31.3200 -97.3300 251.000 122.0 99.088 3.350 -999.990 -999.990 0.991 ..P WKT 2010 06 26 00 44 55 31.3200 -97.3300 251.000 457.0 90.688 2.690 -999.990 -999.990 0.907 ..P WKT 2010 06 26 00 54 55 31.3200 -97.3300 251.000 30.0 89.697 3.370 -999.990 -999.990 0.897 ..P WKT 2010 06 26 00 59 55 31.3200 -97.3300 251.000 122.0 94.874 3.570 -999.990 -999.990 0.949 ..P WKT 2010 06 26 01 04 55 31.3200 -97.3300 251.000 457.0 91.266 3.410 -999.990 -999.990 0.913 ..P WKT 2010 06 26 01 09 55 31.3200 -97.3300 251.000 30.0 91.981 3.180 -999.990 -999.990 0.920 ..P WKT 2010 06 26 01 14 55 31.3200 -97.3300 251.000 122.0 101.619 3.240 -999.990 -999.990 1.016 ..P WKT 2010 06 26 01 19 55 31.3200 -97.3300 251.000 457.0 92.574 2.680 -999.990 -999.990 0.926 ..P WKT 2010 06 26 01 29 55 31.3200 -97.3300 251.000 30.0 103.942 3.960 -999.990 -999.990 1.039 ..P WKT 2010 06 26 01 34 55 31.3200 -97.3300 251.000 122.0 100.793 3.250 -999.990 -999.990 1.008 ..P WKT 2010 06 26 01 39 55 31.3200 -97.3300 251.000 457.0 97.086 4.050 -999.990 -999.990 0.971 ..P WKT 2010 06 26 01 44 55 31.3200 -97.3300 251.000 30.0 102.302 4.370 -999.990 -999.990 1.023 ..P WKT 2010 06 26 01 49 55 31.3200 -97.3300 251.000 122.0 96.504 4.210 -999.990 -999.990 0.965 ..P WKT 2010 06 26 01 54 55 31.3200 -97.3300 251.000 457.0 92.936 3.590 -999.990 -999.990 0.929 ..P WKT 2010 06 26 02 04 55 31.3200 -97.3300 251.000 30.0 100.600 3.430 -999.990 -999.990 1.006 ..P WKT 2010 06 26 02 09 55 31.3200 -97.3300 251.000 122.0 90.500 3.410 -999.990 -999.990 0.905 ..P WKT 2010 06 26 02 14 55 31.3200 -97.3300 251.000 457.0 94.759 3.850 -999.990 -999.990 0.948 ..P WKT 2010 06 26 02 19 55 31.3200 -97.3300 251.000 30.0 101.807 4.250 -999.990 -999.990 1.018 ..P WKT 2010 06 26 02 24 55 31.3200 -97.3300 251.000 122.0 98.817 4.900 -999.990 -999.990 0.988 ..P WKT 2010 06 26 02 29 55 31.3200 -97.3300 251.000 457.0 86.627 5.370 -999.990 -999.990 0.866 ..P WKT 2010 06 26 02 39 55 31.3200 -97.3300 251.000 30.0 94.867 4.870 -999.990 -999.990 0.949 ..P WKT 2010 06 26 02 44 55 31.3200 -97.3300 251.000 122.0 91.321 4.940 -999.990 -999.990 0.913 ..P WKT 2010 06 26 02 49 55 31.3200 -97.3300 251.000 457.0 110.914 3.800 -999.990 -999.990 1.109 ..P WKT 2010 06 26 02 54 55 31.3200 -97.3300 251.000 30.0 94.821 2.950 -999.990 -999.990 0.948 ..P WKT 2010 06 26 02 59 55 31.3200 -97.3300 251.000 122.0 95.455 2.550 -999.990 -999.990 0.955 ..P WKT 2010 06 26 03 04 55 31.3200 -97.3300 251.000 457.0 89.120 3.020 -999.990 -999.990 0.891 ..P WKT 2010 06 26 03 14 55 31.3200 -97.3300 251.000 30.0 90.909 2.350 -999.990 -999.990 0.909 ..P WKT 2010 06 26 03 19 55 31.3200 -97.3300 251.000 122.0 95.686 2.300 -999.990 -999.990 0.957 ..P WKT 2010 06 26 03 24 55 31.3200 -97.3300 251.000 457.0 93.771 2.430 -999.990 -999.990 0.938 ..P WKT 2010 06 26 03 29 55 31.3200 -97.3300 251.000 30.0 92.415 2.830 -999.990 -999.990 0.924 ..P WKT 2010 06 26 03 34 55 31.3200 -97.3300 251.000 122.0 99.980 3.620 -999.990 -999.990 1.000 ..P WKT 2010 06 26 03 39 55 31.3200 -97.3300 251.000 457.0 94.163 3.960 -999.990 -999.990 0.942 ..P WKT 2010 06 26 03 49 55 31.3200 -97.3300 251.000 30.0 98.320 2.990 -999.990 -999.990 0.983 ..P WKT 2010 06 26 03 54 55 31.3200 -97.3300 251.000 122.0 95.471 2.930 -999.990 -999.990 0.955 ..P WKT 2010 06 26 03 59 55 31.3200 -97.3300 251.000 457.0 90.251 3.460 -999.990 -999.990 0.903 ..P WKT 2010 06 26 04 04 55 31.3200 -97.3300 251.000 30.0 94.650 2.850 -999.990 -999.990 0.947 ..P WKT 2010 06 26 04 09 55 31.3200 -97.3300 251.000 122.0 95.006 2.940 -999.990 -999.990 0.950 ..P WKT 2010 06 26 04 14 55 31.3200 -97.3300 251.000 457.0 86.581 3.750 -999.990 -999.990 0.866 ..P WKT 2010 06 26 04 24 55 31.3200 -97.3300 251.000 30.0 91.156 2.540 -999.990 -999.990 0.912 ..P WKT 2010 06 26 04 29 55 31.3200 -97.3300 251.000 122.0 94.400 3.130 -999.990 -999.990 0.944 ..P WKT 2010 06 26 04 34 55 31.3200 -97.3300 251.000 457.0 99.454 3.370 -999.990 -999.990 0.995 ..P WKT 2010 06 26 04 39 55 31.3200 -97.3300 251.000 30.0 89.875 3.770 -999.990 -999.990 0.899 ..P WKT 2010 06 26 04 44 55 31.3200 -97.3300 251.000 122.0 98.414 3.230 -999.990 -999.990 0.984 ..P WKT 2010 06 26 04 49 55 31.3200 -97.3300 251.000 457.0 79.497 3.160 -999.990 -999.990 0.795 ..P WKT 2010 06 26 05 04 55 31.3200 -97.3300 251.000 30.0 90.575 3.040 -999.990 -999.990 0.906 ..P WKT 2010 06 26 05 09 55 31.3200 -97.3300 251.000 122.0 96.165 4.130 -999.990 -999.990 0.962 ..P WKT 2010 06 26 05 14 55 31.3200 -97.3300 251.000 457.0 75.415 3.890 -999.990 -999.990 0.754 ..P WKT 2010 06 26 05 19 55 31.3200 -97.3300 251.000 30.0 93.129 4.490 -999.990 -999.990 0.931 ..P WKT 2010 06 26 05 24 55 31.3200 -97.3300 251.000 122.0 97.325 3.430 -999.990 -999.990 0.973 ..P WKT 2010 06 26 05 29 55 31.3200 -97.3300 251.000 457.0 77.969 3.920 -999.990 -999.990 0.780 ..P WKT 2010 06 26 05 39 55 31.3200 -97.3300 251.000 30.0 94.646 3.760 -999.990 -999.990 0.946 ..P WKT 2010 06 26 05 44 55 31.3200 -97.3300 251.000 122.0 97.789 3.120 -999.990 -999.990 0.978 ..P WKT 2010 06 26 05 49 55 31.3200 -97.3300 251.000 457.0 79.193 3.800 -999.990 -999.990 0.792 ..P WKT 2010 06 26 05 54 55 31.3200 -97.3300 251.000 30.0 95.854 3.320 -999.990 -999.990 0.959 ..P WKT 2010 06 26 05 59 55 31.3200 -97.3300 251.000 122.0 93.562 4.270 -999.990 -999.990 0.936 ..P WKT 2010 06 26 06 04 55 31.3200 -97.3300 251.000 457.0 74.269 2.290 -999.990 -999.990 0.743 ..P WKT 2010 06 26 06 14 55 31.3200 -97.3300 251.000 30.0 93.973 2.560 -999.990 -999.990 0.940 ..P WKT 2010 06 26 06 19 55 31.3200 -97.3300 251.000 122.0 92.697 2.670 -999.990 -999.990 0.927 ..P WKT 2010 06 26 06 24 55 31.3200 -97.3300 251.000 457.0 75.814 3.100 -999.990 -999.990 0.758 ..P WKT 2010 06 26 06 29 55 31.3200 -97.3300 251.000 30.0 94.882 2.770 -999.990 -999.990 0.949 ..P WKT 2010 06 26 06 34 55 31.3200 -97.3300 251.000 122.0 92.212 3.050 -999.990 -999.990 0.922 ..P WKT 2010 06 26 06 39 55 31.3200 -97.3300 251.000 457.0 80.346 2.500 -999.990 -999.990 0.803 ..P WKT 2010 06 26 06 49 55 31.3200 -97.3300 251.000 30.0 91.170 2.450 -999.990 -999.990 0.912 ..P WKT 2010 06 26 06 54 55 31.3200 -97.3300 251.000 122.0 93.796 2.440 -999.990 -999.990 0.938 ..P WKT 2010 06 26 06 59 55 31.3200 -97.3300 251.000 457.0 73.848 2.520 -999.990 -999.990 0.738 ..P WKT 2010 06 26 07 04 55 31.3200 -97.3300 251.000 30.0 81.489 2.720 -999.990 -999.990 0.815 ..P WKT 2010 06 26 07 09 55 31.3200 -97.3300 251.000 122.0 86.344 2.880 -999.990 -999.990 0.863 ..P WKT 2010 06 26 07 14 55 31.3200 -97.3300 251.000 457.0 73.643 2.760 -999.990 -999.990 0.736 ..P WKT 2010 06 26 07 24 55 31.3200 -97.3300 251.000 30.0 80.366 2.810 -999.990 -999.990 0.804 ..P WKT 2010 06 26 07 29 55 31.3200 -97.3300 251.000 122.0 87.530 2.900 -999.990 -999.990 0.875 ..P WKT 2010 06 26 07 34 55 31.3200 -97.3300 251.000 457.0 78.252 4.090 -999.990 -999.990 0.783 ..P WKT 2010 06 26 07 39 55 31.3200 -97.3300 251.000 30.0 88.201 3.200 -999.990 -999.990 0.882 ..P WKT 2010 06 26 07 44 55 31.3200 -97.3300 251.000 122.0 84.219 3.310 -999.990 -999.990 0.842 ..P WKT 2010 06 26 07 49 55 31.3200 -97.3300 251.000 457.0 78.285 3.500 -999.990 -999.990 0.783 ..P WKT 2010 06 26 07 59 55 31.3200 -97.3300 251.000 30.0 82.461 3.700 -999.990 -999.990 0.825 ..P WKT 2010 06 26 08 04 55 31.3200 -97.3300 251.000 122.0 85.882 4.150 -999.990 -999.990 0.859 ..P WKT 2010 06 26 08 09 55 31.3200 -97.3300 251.000 457.0 69.938 3.010 -999.990 -999.990 0.699 ..P WKT 2010 06 26 08 14 55 31.3200 -97.3300 251.000 30.0 82.972 3.820 -999.990 -999.990 0.830 ..P WKT 2010 06 26 08 19 55 31.3200 -97.3300 251.000 122.0 82.074 3.180 -999.990 -999.990 0.821 ..P WKT 2010 06 26 08 24 55 31.3200 -97.3300 251.000 457.0 70.588 4.650 -999.990 -999.990 0.706 ..P WKT 2010 06 26 08 34 55 31.3200 -97.3300 251.000 30.0 80.993 3.110 -999.990 -999.990 0.810 ..P WKT 2010 06 26 08 39 55 31.3200 -97.3300 251.000 122.0 78.364 3.390 -999.990 -999.990 0.784 ..P WKT 2010 06 26 08 44 55 31.3200 -97.3300 251.000 457.0 71.555 3.470 -999.990 -999.990 0.716 ..P WKT 2010 06 26 08 49 55 31.3200 -97.3300 251.000 30.0 85.643 3.140 -999.990 -999.990 0.856 ..P WKT 2010 06 26 08 54 55 31.3200 -97.3300 251.000 122.0 83.850 4.330 -999.990 -999.990 0.838 ..P WKT 2010 06 26 08 59 55 31.3200 -97.3300 251.000 457.0 78.435 2.760 -999.990 -999.990 0.784 ..P WKT 2010 06 26 09 09 55 31.3200 -97.3300 251.000 30.0 79.346 3.560 -999.990 -999.990 0.793 ..P WKT 2010 06 26 09 14 55 31.3200 -97.3300 251.000 122.0 82.050 3.220 -999.990 -999.990 0.821 ..P WKT 2010 06 26 09 19 55 31.3200 -97.3300 251.000 457.0 67.899 3.370 -999.990 -999.990 0.679 ..P WKT 2010 06 26 09 24 55 31.3200 -97.3300 251.000 30.0 81.190 4.080 -999.990 -999.990 0.812 ..P WKT 2010 06 26 09 29 55 31.3200 -97.3300 251.000 122.0 79.576 3.870 -999.990 -999.990 0.796 ..P WKT 2010 06 26 09 34 55 31.3200 -97.3300 251.000 457.0 70.858 4.350 -999.990 -999.990 0.709 ..P WKT 2010 06 26 09 44 55 31.3200 -97.3300 251.000 30.0 78.057 3.850 -999.990 -999.990 0.781 ..P WKT 2010 06 26 09 49 55 31.3200 -97.3300 251.000 122.0 84.084 4.410 -999.990 -999.990 0.841 ..P WKT 2010 06 26 09 54 55 31.3200 -97.3300 251.000 457.0 70.750 4.140 -999.990 -999.990 0.708 ..P WKT 2010 06 26 09 59 55 31.3200 -97.3300 251.000 30.0 78.031 4.120 -999.990 -999.990 0.780 ..P WKT 2010 06 26 10 04 55 31.3200 -97.3300 251.000 122.0 83.640 4.110 -999.990 -999.990 0.836 ..P WKT 2010 06 26 10 09 55 31.3200 -97.3300 251.000 457.0 71.978 4.580 -999.990 -999.990 0.720 ..P WKT 2010 06 26 10 19 55 31.3200 -97.3300 251.000 30.0 75.435 3.830 -999.990 -999.990 0.754 ..P WKT 2010 06 26 10 24 55 31.3200 -97.3300 251.000 122.0 84.427 4.880 -999.990 -999.990 0.844 ..P WKT 2010 06 26 10 29 55 31.3200 -97.3300 251.000 457.0 74.198 3.860 -999.990 -999.990 0.742 ..P WKT 2010 06 26 10 34 55 31.3200 -97.3300 251.000 30.0 83.189 4.550 -999.990 -999.990 0.832 ..P WKT 2010 06 26 10 39 55 31.3200 -97.3300 251.000 122.0 84.102 3.340 -999.990 -999.990 0.841 ..P WKT 2010 06 26 10 44 55 31.3200 -97.3300 251.000 457.0 86.687 4.170 -999.990 -999.990 0.867 ..P WKT 2010 06 26 10 54 55 31.3200 -97.3300 251.000 30.0 87.121 3.130 -999.990 -999.990 0.871 ..P WKT 2010 06 26 10 59 55 31.3200 -97.3300 251.000 122.0 82.184 3.670 -999.990 -999.990 0.822 ..P WKT 2010 06 26 11 04 55 31.3200 -97.3300 251.000 457.0 73.626 4.790 -999.990 -999.990 0.736 ..P WKT 2010 06 26 11 09 55 31.3200 -97.3300 251.000 30.0 82.617 4.080 -999.990 -999.990 0.826 ..P WKT 2010 06 26 11 14 55 31.3200 -97.3300 251.000 122.0 89.380 3.210 -999.990 -999.990 0.894 ..P WKT 2010 06 26 11 19 55 31.3200 -97.3300 251.000 457.0 71.631 3.620 -999.990 -999.990 0.716 ..P WKT 2010 06 26 11 29 55 31.3200 -97.3300 251.000 30.0 85.076 3.300 -999.990 -999.990 0.851 ..P WKT 2010 06 26 11 34 55 31.3200 -97.3300 251.000 122.0 87.302 4.140 -999.990 -999.990 0.873 ..P WKT 2010 06 26 11 39 55 31.3200 -97.3300 251.000 457.0 75.601 3.540 -999.990 -999.990 0.756 ..P WKT 2010 06 26 11 44 55 31.3200 -97.3300 251.000 30.0 85.069 4.330 -999.990 -999.990 0.851 ..P WKT 2010 06 26 11 49 55 31.3200 -97.3300 251.000 122.0 89.524 3.280 -999.990 -999.990 0.895 ..P WKT 2010 06 26 12 09 55 31.3200 -97.3300 251.000 457.0 79.178 2.930 -999.990 -999.990 0.792 ..P WKT 2010 06 26 12 10 25 31.3200 -97.3300 251.000 457.0 78.002 2.570 -999.990 -999.990 0.780 ..P WKT 2010 06 26 12 10 55 31.3200 -97.3300 251.000 457.0 84.207 4.640 -999.990 -999.990 0.842 ..P WKT 2010 06 26 12 11 25 31.3200 -97.3300 251.000 457.0 84.006 4.090 -999.990 -999.990 0.840 ..P WKT 2010 06 26 12 11 55 31.3200 -97.3300 251.000 457.0 83.665 3.360 -999.990 -999.990 0.837 ..P WKT 2010 06 26 12 12 25 31.3200 -97.3300 251.000 457.0 99.481 6.740 -999.990 -999.990 0.995 ..P WKT 2010 06 26 12 12 55 31.3200 -97.3300 251.000 457.0 108.332 4.950 -999.990 -999.990 1.083 ..P WKT 2010 06 26 12 13 25 31.3200 -97.3300 251.000 457.0 119.551 3.200 -999.990 -999.990 1.196 ..P WKT 2010 06 26 12 13 55 31.3200 -97.3300 251.000 457.0 114.337 4.490 -999.990 -999.990 1.143 ..P WKT 2010 06 26 12 14 25 31.3200 -97.3300 251.000 457.0 101.740 4.400 -999.990 -999.990 1.017 ..P WKT 2010 06 26 12 14 55 31.3200 -97.3300 251.000 457.0 90.257 4.440 -999.990 -999.990 0.903 ..P WKT 2010 06 26 12 19 55 31.3200 -97.3300 251.000 30.0 86.155 3.320 -999.990 -999.990 0.862 ..P WKT 2010 06 26 12 24 55 31.3200 -97.3300 251.000 122.0 91.107 3.680 -999.990 -999.990 0.911 ..P WKT 2010 06 26 12 29 55 31.3200 -97.3300 251.000 457.0 78.786 4.020 -999.990 -999.990 0.788 ..P WKT 2010 06 26 12 34 55 31.3200 -97.3300 251.000 30.0 79.280 3.390 -999.990 -999.990 0.793 ..P WKT 2010 06 26 12 39 55 31.3200 -97.3300 251.000 122.0 92.871 3.940 -999.990 -999.990 0.929 ..P WKT 2010 06 26 12 44 55 31.3200 -97.3300 251.000 457.0 74.139 2.430 -999.990 -999.990 0.741 ..P WKT 2010 06 26 12 54 55 31.3200 -97.3300 251.000 30.0 88.023 2.770 -999.990 -999.990 0.880 ..P WKT 2010 06 26 12 59 55 31.3200 -97.3300 251.000 122.0 85.530 3.060 -999.990 -999.990 0.855 ..P WKT 2010 06 26 13 04 55 31.3200 -97.3300 251.000 457.0 75.510 3.120 -999.990 -999.990 0.755 ..P WKT 2010 06 26 13 09 55 31.3200 -97.3300 251.000 30.0 83.190 3.040 -999.990 -999.990 0.832 ..P WKT 2010 06 26 13 14 55 31.3200 -97.3300 251.000 122.0 89.894 3.410 -999.990 -999.990 0.899 ..P WKT 2010 06 26 13 19 55 31.3200 -97.3300 251.000 457.0 73.740 3.110 -999.990 -999.990 0.737 ..P WKT 2010 06 26 13 29 55 31.3200 -97.3300 251.000 30.0 84.662 4.520 -999.990 -999.990 0.847 ..P WKT 2010 06 26 13 34 55 31.3200 -97.3300 251.000 122.0 91.249 2.940 -999.990 -999.990 0.912 ..P WKT 2010 06 26 13 39 55 31.3200 -97.3300 251.000 457.0 80.409 2.910 -999.990 -999.990 0.804 ..P WKT 2010 06 26 13 44 55 31.3200 -97.3300 251.000 30.0 87.693 2.480 -999.990 -999.990 0.877 ..P WKT 2010 06 26 13 49 55 31.3200 -97.3300 251.000 122.0 89.541 4.020 -999.990 -999.990 0.895 ..P WKT 2010 06 26 13 54 55 31.3200 -97.3300 251.000 457.0 75.074 3.050 -999.990 -999.990 0.751 ..P WKT 2010 06 26 14 04 55 31.3200 -97.3300 251.000 30.0 86.956 3.460 -999.990 -999.990 0.870 ..P WKT 2010 06 26 14 09 55 31.3200 -97.3300 251.000 122.0 90.159 2.480 -999.990 -999.990 0.902 ..P WKT 2010 06 26 14 14 55 31.3200 -97.3300 251.000 457.0 88.619 2.950 -999.990 -999.990 0.886 ..P WKT 2010 06 26 14 19 55 31.3200 -97.3300 251.000 30.0 85.685 2.540 -999.990 -999.990 0.857 ..P WKT 2010 06 26 14 24 55 31.3200 -97.3300 251.000 122.0 88.052 2.910 -999.990 -999.990 0.881 ..P WKT 2010 06 26 14 29 55 31.3200 -97.3300 251.000 457.0 81.490 4.040 -999.990 -999.990 0.815 ..P WKT 2010 06 26 14 39 55 31.3200 -97.3300 251.000 30.0 86.303 2.840 -999.990 -999.990 0.863 ..P WKT 2010 06 26 14 44 55 31.3200 -97.3300 251.000 122.0 91.540 3.620 -999.990 -999.990 0.915 ..P WKT 2010 06 26 14 49 55 31.3200 -97.3300 251.000 457.0 87.289 2.750 -999.990 -999.990 0.873 ..P WKT 2010 06 26 14 54 55 31.3200 -97.3300 251.000 30.0 93.922 2.490 -999.990 -999.990 0.939 ..P WKT 2010 06 26 14 59 55 31.3200 -97.3300 251.000 122.0 93.578 2.420 -999.990 -999.990 0.936 ..P WKT 2010 06 26 15 04 55 31.3200 -97.3300 251.000 457.0 87.373 2.290 -999.990 -999.990 0.874 ..P WKT 2010 06 26 15 14 55 31.3200 -97.3300 251.000 30.0 85.848 2.510 -999.990 -999.990 0.858 ..P WKT 2010 06 26 15 19 55 31.3200 -97.3300 251.000 122.0 91.924 2.340 -999.990 -999.990 0.919 ..P WKT 2010 06 26 15 24 55 31.3200 -97.3300 251.000 457.0 94.372 2.430 -999.990 -999.990 0.944 ..P WKT 2010 06 26 15 29 55 31.3200 -97.3300 251.000 30.0 97.100 2.880 -999.990 -999.990 0.971 ..P WKT 2010 06 26 15 34 55 31.3200 -97.3300 251.000 122.0 101.503 2.700 -999.990 -999.990 1.015 ..P WKT 2010 06 26 15 39 55 31.3200 -97.3300 251.000 457.0 86.919 3.010 -999.990 -999.990 0.869 ..P WKT 2010 06 26 15 49 55 31.3200 -97.3300 251.000 30.0 85.911 3.300 -999.990 -999.990 0.859 ..P WKT 2010 06 26 15 54 55 31.3200 -97.3300 251.000 122.0 114.015 3.210 -999.990 -999.990 1.140 ..P WKT 2010 06 26 15 59 55 31.3200 -97.3300 251.000 457.0 88.494 3.130 -999.990 -999.990 0.885 ..P WKT 2010 06 26 16 04 55 31.3200 -97.3300 251.000 30.0 90.065 3.610 -999.990 -999.990 0.901 ..P WKT 2010 06 26 16 09 55 31.3200 -97.3300 251.000 122.0 97.642 2.920 -999.990 -999.990 0.976 ..P WKT 2010 06 26 16 14 55 31.3200 -97.3300 251.000 457.0 91.113 3.600 -999.990 -999.990 0.911 ..P WKT 2010 06 26 16 24 55 31.3200 -97.3300 251.000 30.0 95.315 3.440 -999.990 -999.990 0.953 ..P WKT 2010 06 26 16 29 55 31.3200 -97.3300 251.000 122.0 98.223 3.950 -999.990 -999.990 0.982 ..P WKT 2010 06 26 16 34 55 31.3200 -97.3300 251.000 457.0 88.699 3.720 -999.990 -999.990 0.887 ..P WKT 2010 06 26 16 39 55 31.3200 -97.3300 251.000 30.0 93.703 3.780 -999.990 -999.990 0.937 ..P WKT 2010 06 26 16 44 55 31.3200 -97.3300 251.000 122.0 96.054 3.600 -999.990 -999.990 0.961 ..P WKT 2010 06 26 16 49 55 31.3200 -97.3300 251.000 457.0 90.440 3.840 -999.990 -999.990 0.904 ..P WKT 2010 06 26 17 04 55 31.3200 -97.3300 251.000 30.0 88.594 4.500 -999.990 -999.990 0.886 ..P WKT 2010 06 26 17 09 55 31.3200 -97.3300 251.000 122.0 95.440 3.820 -999.990 -999.990 0.954 ..P WKT 2010 06 26 17 14 55 31.3200 -97.3300 251.000 457.0 89.147 3.580 -999.990 -999.990 0.891 ..P WKT 2010 06 26 17 19 55 31.3200 -97.3300 251.000 30.0 93.199 4.460 -999.990 -999.990 0.932 ..P WKT 2010 06 26 17 24 55 31.3200 -97.3300 251.000 122.0 98.928 3.630 -999.990 -999.990 0.989 ..P WKT 2010 06 26 17 29 55 31.3200 -97.3300 251.000 457.0 90.538 3.370 -999.990 -999.990 0.905 ..P WKT 2010 06 26 17 39 55 31.3200 -97.3300 251.000 30.0 91.210 3.990 -999.990 -999.990 0.912 ..P WKT 2010 06 26 17 44 55 31.3200 -97.3300 251.000 122.0 102.511 3.980 -999.990 -999.990 1.025 ..P WKT 2010 06 26 17 49 55 31.3200 -97.3300 251.000 457.0 95.495 3.840 -999.990 -999.990 0.955 ..P WKT 2010 06 26 17 54 55 31.3200 -97.3300 251.000 30.0 89.737 3.540 -999.990 -999.990 0.897 ..P WKT 2010 06 26 17 59 55 31.3200 -97.3300 251.000 122.0 94.607 4.450 -999.990 -999.990 0.946 ..P WKT 2010 06 26 18 04 55 31.3200 -97.3300 251.000 457.0 78.218 3.030 -999.990 -999.990 0.782 ..P WKT 2010 06 26 18 14 55 31.3200 -97.3300 251.000 30.0 88.298 2.600 -999.990 -999.990 0.883 ..P WKT 2010 06 26 18 19 55 31.3200 -97.3300 251.000 122.0 88.194 3.210 -999.990 -999.990 0.882 ..P WKT 2010 06 26 18 24 55 31.3200 -97.3300 251.000 457.0 84.171 3.170 -999.990 -999.990 0.842 ..P WKT 2010 06 26 18 29 55 31.3200 -97.3300 251.000 30.0 76.512 2.820 -999.990 -999.990 0.765 ..P WKT 2010 06 26 18 34 55 31.3200 -97.3300 251.000 122.0 88.438 2.800 -999.990 -999.990 0.884 ..P WKT 2010 06 26 18 39 55 31.3200 -97.3300 251.000 457.0 80.218 2.430 -999.990 -999.990 0.802 ..P WKT 2010 06 26 18 49 55 31.3200 -97.3300 251.000 30.0 79.847 2.620 -999.990 -999.990 0.798 ..P WKT 2010 06 26 18 54 55 31.3200 -97.3300 251.000 122.0 86.299 2.630 -999.990 -999.990 0.863 ..P WKT 2010 06 26 18 59 55 31.3200 -97.3300 251.000 457.0 81.556 2.940 -999.990 -999.990 0.816 ..P WKT 2010 06 26 19 04 55 31.3200 -97.3300 251.000 30.0 81.850 3.040 -999.990 -999.990 0.819 ..P WKT 2010 06 26 19 09 55 31.3200 -97.3300 251.000 122.0 86.903 2.770 -999.990 -999.990 0.869 ..P WKT 2010 06 26 19 14 55 31.3200 -97.3300 251.000 457.0 79.080 2.680 -999.990 -999.990 0.791 ..P WKT 2010 06 26 19 24 55 31.3200 -97.3300 251.000 30.0 80.529 3.770 -999.990 -999.990 0.805 ..P WKT 2010 06 26 19 29 55 31.3200 -97.3300 251.000 122.0 93.163 2.880 -999.990 -999.990 0.932 ..P WKT 2010 06 26 19 34 55 31.3200 -97.3300 251.000 457.0 81.157 2.760 -999.990 -999.990 0.812 ..P WKT 2010 06 26 19 39 55 31.3200 -97.3300 251.000 30.0 94.354 2.410 -999.990 -999.990 0.944 ..P WKT 2010 06 26 19 44 55 31.3200 -97.3300 251.000 122.0 93.269 3.270 -999.990 -999.990 0.933 ..P WKT 2010 06 26 19 49 55 31.3200 -97.3300 251.000 457.0 82.241 2.230 -999.990 -999.990 0.822 ..P WKT 2010 06 26 19 59 55 31.3200 -97.3300 251.000 30.0 83.910 2.110 -999.990 -999.990 0.839 ..P WKT 2010 06 26 20 04 55 31.3200 -97.3300 251.000 122.0 95.770 2.500 -999.990 -999.990 0.958 ..P WKT 2010 06 26 20 09 55 31.3200 -97.3300 251.000 457.0 81.999 2.670 -999.990 -999.990 0.820 ..P WKT 2010 06 26 20 14 55 31.3200 -97.3300 251.000 30.0 79.853 5.500 -999.990 -999.990 0.799 ..P WKT 2010 06 26 20 19 55 31.3200 -97.3300 251.000 122.0 86.531 2.730 -999.990 -999.990 0.865 ..P WKT 2010 06 26 20 24 55 31.3200 -97.3300 251.000 457.0 76.540 2.850 -999.990 -999.990 0.765 ..P WKT 2010 06 26 20 34 55 31.3200 -97.3300 251.000 30.0 80.972 3.640 -999.990 -999.990 0.810 ..P WKT 2010 06 26 20 39 55 31.3200 -97.3300 251.000 122.0 89.233 2.860 -999.990 -999.990 0.892 ..P WKT 2010 06 26 20 44 55 31.3200 -97.3300 251.000 457.0 82.502 3.030 -999.990 -999.990 0.825 ..P WKT 2010 06 26 20 49 55 31.3200 -97.3300 251.000 30.0 82.076 3.890 -999.990 -999.990 0.821 ..P WKT 2010 06 26 20 54 55 31.3200 -97.3300 251.000 122.0 90.900 3.740 -999.990 -999.990 0.909 ..P WKT 2010 06 26 20 59 55 31.3200 -97.3300 251.000 457.0 81.365 3.810 -999.990 -999.990 0.814 ..P WKT 2010 06 26 21 09 55 31.3200 -97.3300 251.000 30.0 84.538 3.950 -999.990 -999.990 0.845 ..P WKT 2010 06 26 21 14 55 31.3200 -97.3300 251.000 122.0 92.763 3.170 -999.990 -999.990 0.928 ..P WKT 2010 06 26 21 19 55 31.3200 -97.3300 251.000 457.0 83.746 2.870 -999.990 -999.990 0.837 ..P WKT 2010 06 26 21 24 55 31.3200 -97.3300 251.000 30.0 83.421 3.600 -999.990 -999.990 0.834 ..P WKT 2010 06 26 21 29 55 31.3200 -97.3300 251.000 122.0 91.507 3.390 -999.990 -999.990 0.915 ..P WKT 2010 06 26 21 34 55 31.3200 -97.3300 251.000 457.0 83.330 3.340 -999.990 -999.990 0.833 ..P WKT 2010 06 26 21 44 55 31.3200 -97.3300 251.000 30.0 85.463 2.700 -999.990 -999.990 0.855 ..P WKT 2010 06 26 21 49 55 31.3200 -97.3300 251.000 122.0 97.738 2.670 -999.990 -999.990 0.977 ..P WKT 2010 06 26 21 54 55 31.3200 -97.3300 251.000 457.0 79.021 2.710 -999.990 -999.990 0.790 ..P WKT 2010 06 26 21 59 55 31.3200 -97.3300 251.000 30.0 86.669 4.050 -999.990 -999.990 0.867 ..P WKT 2010 06 26 22 04 55 31.3200 -97.3300 251.000 122.0 88.988 3.380 -999.990 -999.990 0.890 ..P WKT 2010 06 26 22 09 55 31.3200 -97.3300 251.000 457.0 85.697 3.130 -999.990 -999.990 0.857 ..P WKT 2010 06 26 22 19 55 31.3200 -97.3300 251.000 30.0 86.107 3.200 -999.990 -999.990 0.861 ..P WKT 2010 06 26 22 24 55 31.3200 -97.3300 251.000 122.0 86.162 4.640 -999.990 -999.990 0.862 ..P WKT 2010 06 26 22 29 55 31.3200 -97.3300 251.000 457.0 85.656 4.160 -999.990 -999.990 0.857 ..P WKT 2010 06 26 22 34 55 31.3200 -97.3300 251.000 30.0 84.027 3.040 -999.990 -999.990 0.840 ..P WKT 2010 06 26 22 39 55 31.3200 -97.3300 251.000 122.0 88.573 5.130 -999.990 -999.990 0.886 ..P WKT 2010 06 26 22 44 55 31.3200 -97.3300 251.000 457.0 83.577 3.480 -999.990 -999.990 0.836 ..P WKT 2010 06 26 22 54 55 31.3200 -97.3300 251.000 30.0 81.721 4.020 -999.990 -999.990 0.817 ..P WKT 2010 06 26 22 59 55 31.3200 -97.3300 251.000 122.0 90.197 4.170 -999.990 -999.990 0.902 ..P WKT 2010 06 26 23 04 55 31.3200 -97.3300 251.000 457.0 87.445 3.180 -999.990 -999.990 0.874 ..P WKT 2010 06 26 23 09 55 31.3200 -97.3300 251.000 30.0 89.746 4.580 -999.990 -999.990 0.897 ..P WKT 2010 06 26 23 14 55 31.3200 -97.3300 251.000 122.0 96.539 3.500 -999.990 -999.990 0.965 ..P WKT 2010 06 26 23 19 55 31.3200 -97.3300 251.000 457.0 93.226 3.490 -999.990 -999.990 0.932 ..P WKT 2010 06 26 23 29 55 31.3200 -97.3300 251.000 30.0 89.821 3.750 -999.990 -999.990 0.898 ..P WKT 2010 06 26 23 34 55 31.3200 -97.3300 251.000 122.0 93.663 3.490 -999.990 -999.990 0.937 ..P WKT 2010 06 26 23 39 55 31.3200 -97.3300 251.000 457.0 87.114 3.890 -999.990 -999.990 0.871 ..P WKT 2010 06 26 23 44 55 31.3200 -97.3300 251.000 30.0 83.653 3.580 -999.990 -999.990 0.837 ..P WKT 2010 06 26 23 49 55 31.3200 -97.3300 251.000 122.0 91.286 4.820 -999.990 -999.990 0.913 ..P WKT 2010 06 27 00 09 55 31.3200 -97.3300 251.000 457.0 84.416 3.470 -999.990 -999.990 0.844 ..P WKT 2010 06 27 00 10 25 31.3200 -97.3300 251.000 457.0 84.351 3.310 -999.990 -999.990 0.844 ..P WKT 2010 06 27 00 10 55 31.3200 -97.3300 251.000 457.0 89.624 4.350 -999.990 -999.990 0.896 ..P WKT 2010 06 27 00 11 25 31.3200 -97.3300 251.000 457.0 87.593 4.060 -999.990 -999.990 0.876 ..P WKT 2010 06 27 00 11 55 31.3200 -97.3300 251.000 457.0 88.372 3.450 -999.990 -999.990 0.884 ..P WKT 2010 06 27 00 12 25 31.3200 -97.3300 251.000 457.0 90.414 3.800 -999.990 -999.990 0.904 ..P WKT 2010 06 27 00 12 55 31.3200 -97.3300 251.000 457.0 84.873 3.480 -999.990 -999.990 0.849 ..P WKT 2010 06 27 00 13 25 31.3200 -97.3300 251.000 457.0 87.477 3.440 -999.990 -999.990 0.875 ..P WKT 2010 06 27 00 13 55 31.3200 -97.3300 251.000 457.0 90.361 3.380 -999.990 -999.990 0.904 ..P WKT 2010 06 27 00 14 25 31.3200 -97.3300 251.000 457.0 90.578 3.330 -999.990 -999.990 0.906 ..P WKT 2010 06 27 00 14 55 31.3200 -97.3300 251.000 457.0 84.054 4.290 -999.990 -999.990 0.841 ..P WKT 2010 06 27 00 19 55 31.3200 -97.3300 251.000 30.0 86.361 3.390 -999.990 -999.990 0.864 ..P WKT 2010 06 27 00 24 55 31.3200 -97.3300 251.000 122.0 97.091 3.820 -999.990 -999.990 0.971 ..P WKT 2010 06 27 00 29 55 31.3200 -97.3300 251.000 457.0 91.113 4.360 -999.990 -999.990 0.911 ..P WKT 2010 06 27 00 34 55 31.3200 -97.3300 251.000 30.0 93.559 3.770 -999.990 -999.990 0.936 ..P WKT 2010 06 27 00 39 55 31.3200 -97.3300 251.000 122.0 105.270 3.140 -999.990 -999.990 1.053 ..P WKT 2010 06 27 00 44 55 31.3200 -97.3300 251.000 457.0 93.256 2.810 -999.990 -999.990 0.933 ..P WKT 2010 06 27 00 54 55 31.3200 -97.3300 251.000 30.0 100.355 2.770 -999.990 -999.990 1.004 ..P WKT 2010 06 27 00 59 55 31.3200 -97.3300 251.000 122.0 110.481 3.450 -999.990 -999.990 1.105 ..P WKT 2010 06 27 01 04 55 31.3200 -97.3300 251.000 457.0 98.011 3.340 -999.990 -999.990 0.980 ..P WKT 2010 06 27 01 09 55 31.3200 -97.3300 251.000 30.0 98.453 3.210 -999.990 -999.990 0.985 ..P WKT 2010 06 27 01 14 55 31.3200 -97.3300 251.000 122.0 100.158 2.960 -999.990 -999.990 1.002 ..P WKT 2010 06 27 01 19 55 31.3200 -97.3300 251.000 457.0 103.687 3.450 -999.990 -999.990 1.037 ..P WKT 2010 06 27 01 29 55 31.3200 -97.3300 251.000 30.0 98.417 2.990 -999.990 -999.990 0.984 ..P WKT 2010 06 27 01 34 55 31.3200 -97.3300 251.000 122.0 107.717 2.420 -999.990 -999.990 1.077 ..P WKT 2010 06 27 01 39 55 31.3200 -97.3300 251.000 457.0 94.431 2.430 -999.990 -999.990 0.944 ..P WKT 2010 06 27 01 44 55 31.3200 -97.3300 251.000 30.0 99.382 3.370 -999.990 -999.990 0.994 ..P WKT 2010 06 27 01 49 55 31.3200 -97.3300 251.000 122.0 92.831 2.420 -999.990 -999.990 0.928 ..P WKT 2010 06 27 01 54 55 31.3200 -97.3300 251.000 457.0 91.049 2.710 -999.990 -999.990 0.910 ..P WKT 2010 06 27 02 04 55 31.3200 -97.3300 251.000 30.0 91.653 3.330 -999.990 -999.990 0.917 ..P WKT 2010 06 27 02 09 55 31.3200 -97.3300 251.000 122.0 94.599 2.960 -999.990 -999.990 0.946 ..P WKT 2010 06 27 02 14 55 31.3200 -97.3300 251.000 457.0 90.253 2.860 -999.990 -999.990 0.903 ..P WKT 2010 06 27 02 19 55 31.3200 -97.3300 251.000 30.0 94.602 3.220 -999.990 -999.990 0.946 ..P WKT 2010 06 27 02 24 55 31.3200 -97.3300 251.000 122.0 92.219 2.550 -999.990 -999.990 0.922 ..P WKT 2010 06 27 02 29 55 31.3200 -97.3300 251.000 457.0 79.184 3.410 -999.990 -999.990 0.792 ..P WKT 2010 06 27 02 39 55 31.3200 -97.3300 251.000 30.0 95.447 2.980 -999.990 -999.990 0.954 ..P WKT 2010 06 27 02 44 55 31.3200 -97.3300 251.000 122.0 95.869 3.600 -999.990 -999.990 0.959 ..P WKT 2010 06 27 02 49 55 31.3200 -97.3300 251.000 457.0 86.760 4.450 -999.990 -999.990 0.868 ..P WKT 2010 06 27 02 54 55 31.3200 -97.3300 251.000 30.0 92.508 3.060 -999.990 -999.990 0.925 ..P WKT 2010 06 27 02 59 55 31.3200 -97.3300 251.000 122.0 94.611 3.420 -999.990 -999.990 0.946 ..P WKT 2010 06 27 03 04 55 31.3200 -97.3300 251.000 457.0 82.702 2.260 -999.990 -999.990 0.827 ..P WKT 2010 06 27 03 14 55 31.3200 -97.3300 251.000 30.0 92.233 2.230 -999.990 -999.990 0.922 ..P WKT 2010 06 27 03 19 55 31.3200 -97.3300 251.000 122.0 96.577 2.250 -999.990 -999.990 0.966 ..P WKT 2010 06 27 03 24 55 31.3200 -97.3300 251.000 457.0 98.399 2.520 -999.990 -999.990 0.984 ..P WKT 2010 06 27 03 29 55 31.3200 -97.3300 251.000 30.0 97.420 2.670 -999.990 -999.990 0.974 ..P WKT 2010 06 27 03 34 55 31.3200 -97.3300 251.000 122.0 98.121 2.470 -999.990 -999.990 0.981 ..P WKT 2010 06 27 03 39 55 31.3200 -97.3300 251.000 457.0 92.659 3.070 -999.990 -999.990 0.927 ..P WKT 2010 06 27 03 49 55 31.3200 -97.3300 251.000 30.0 97.724 2.910 -999.990 -999.990 0.977 ..P WKT 2010 06 27 03 54 55 31.3200 -97.3300 251.000 122.0 103.766 3.520 -999.990 -999.990 1.038 ..P WKT 2010 06 27 03 59 55 31.3200 -97.3300 251.000 457.0 89.365 2.510 -999.990 -999.990 0.894 ..P WKT 2010 06 27 04 04 55 31.3200 -97.3300 251.000 30.0 97.647 2.830 -999.990 -999.990 0.976 ..P WKT 2010 06 27 04 09 55 31.3200 -97.3300 251.000 122.0 100.048 3.270 -999.990 -999.990 1.000 ..P WKT 2010 06 27 04 14 55 31.3200 -97.3300 251.000 457.0 88.029 2.080 -999.990 -999.990 0.880 ..P WKT 2010 06 27 04 24 55 31.3200 -97.3300 251.000 30.0 94.072 2.470 -999.990 -999.990 0.941 ..P WKT 2010 06 27 04 29 55 31.3200 -97.3300 251.000 122.0 96.452 3.740 -999.990 -999.990 0.965 ..P WKT 2010 06 27 04 34 55 31.3200 -97.3300 251.000 457.0 91.135 2.750 -999.990 -999.990 0.911 ..P WKT 2010 06 27 04 39 55 31.3200 -97.3300 251.000 30.0 93.096 2.560 -999.990 -999.990 0.931 ..P WKT 2010 06 27 04 44 55 31.3200 -97.3300 251.000 122.0 96.317 2.840 -999.990 -999.990 0.963 ..P WKT 2010 06 27 04 49 55 31.3200 -97.3300 251.000 457.0 89.041 2.800 -999.990 -999.990 0.890 ..P WKT 2010 06 27 05 04 55 31.3200 -97.3300 251.000 30.0 87.782 4.700 -999.990 -999.990 0.878 ..P WKT 2010 06 27 05 09 55 31.3200 -97.3300 251.000 122.0 92.818 5.900 -999.990 -999.990 0.928 ..P WKT 2010 06 27 05 14 55 31.3200 -97.3300 251.000 457.0 86.382 3.100 -999.990 -999.990 0.864 ..P WKT 2010 06 27 05 19 55 31.3200 -97.3300 251.000 30.0 90.297 3.290 -999.990 -999.990 0.903 ..P WKT 2010 06 27 05 24 55 31.3200 -97.3300 251.000 122.0 95.191 2.800 -999.990 -999.990 0.952 ..P WKT 2010 06 27 05 29 55 31.3200 -97.3300 251.000 457.0 82.184 3.060 -999.990 -999.990 0.822 ..P WKT 2010 06 27 05 39 55 31.3200 -97.3300 251.000 30.0 88.358 3.460 -999.990 -999.990 0.884 ..P WKT 2010 06 27 05 44 55 31.3200 -97.3300 251.000 122.0 97.888 2.740 -999.990 -999.990 0.979 ..P WKT 2010 06 27 05 49 55 31.3200 -97.3300 251.000 457.0 89.939 2.660 -999.990 -999.990 0.899 ..P WKT 2010 06 27 05 54 55 31.3200 -97.3300 251.000 30.0 89.541 2.810 -999.990 -999.990 0.895 ..P WKT 2010 06 27 05 59 55 31.3200 -97.3300 251.000 122.0 93.617 2.510 -999.990 -999.990 0.936 ..P WKT 2010 06 27 06 04 55 31.3200 -97.3300 251.000 457.0 80.638 2.410 -999.990 -999.990 0.806 ..P WKT 2010 06 27 06 14 55 31.3200 -97.3300 251.000 30.0 87.132 2.300 -999.990 -999.990 0.871 ..P WKT 2010 06 27 06 19 55 31.3200 -97.3300 251.000 122.0 92.624 2.830 -999.990 -999.990 0.926 ..P WKT 2010 06 27 06 24 55 31.3200 -97.3300 251.000 457.0 75.196 2.990 -999.990 -999.990 0.752 ..P WKT 2010 06 27 06 29 55 31.3200 -97.3300 251.000 30.0 82.086 4.830 -999.990 -999.990 0.821 ..P WKT 2010 06 27 06 34 55 31.3200 -97.3300 251.000 122.0 83.665 2.980 -999.990 -999.990 0.837 ..P WKT 2010 06 27 06 39 55 31.3200 -97.3300 251.000 457.0 76.302 2.530 -999.990 -999.990 0.763 ..P WKT 2010 06 27 06 49 55 31.3200 -97.3300 251.000 30.0 84.410 3.020 -999.990 -999.990 0.844 ..P WKT 2010 06 27 06 54 55 31.3200 -97.3300 251.000 122.0 93.172 4.430 -999.990 -999.990 0.932 ..P WKT 2010 06 27 06 59 55 31.3200 -97.3300 251.000 457.0 72.879 3.490 -999.990 -999.990 0.729 ..P WKT 2010 06 27 07 04 55 31.3200 -97.3300 251.000 30.0 85.553 3.760 -999.990 -999.990 0.856 ..P WKT 2010 06 27 07 09 55 31.3200 -97.3300 251.000 122.0 81.744 4.200 -999.990 -999.990 0.817 ..P WKT 2010 06 27 07 14 55 31.3200 -97.3300 251.000 457.0 69.835 5.290 -999.990 -999.990 0.698 ..P WKT 2010 06 27 07 24 55 31.3200 -97.3300 251.000 30.0 86.857 5.650 -999.990 -999.990 0.869 ..P WKT 2010 06 27 07 29 55 31.3200 -97.3300 251.000 122.0 88.136 4.970 -999.990 -999.990 0.881 ..P WKT 2010 06 27 07 34 55 31.3200 -97.3300 251.000 457.0 74.893 5.040 -999.990 -999.990 0.749 ..P WKT 2010 06 27 07 39 55 31.3200 -97.3300 251.000 30.0 85.666 4.450 -999.990 -999.990 0.857 ..P WKT 2010 06 27 07 44 55 31.3200 -97.3300 251.000 122.0 83.873 6.780 -999.990 -999.990 0.839 ..P WKT 2010 06 27 07 49 55 31.3200 -97.3300 251.000 457.0 77.334 4.560 -999.990 -999.990 0.773 ..P WKT 2010 06 27 07 59 55 31.3200 -97.3300 251.000 30.0 86.890 4.680 -999.990 -999.990 0.869 ..P WKT 2010 06 27 08 04 55 31.3200 -97.3300 251.000 122.0 87.908 4.270 -999.990 -999.990 0.879 ..P WKT 2010 06 27 08 09 55 31.3200 -97.3300 251.000 457.0 71.063 3.540 -999.990 -999.990 0.711 ..P WKT 2010 06 27 08 14 55 31.3200 -97.3300 251.000 30.0 85.340 4.230 -999.990 -999.990 0.853 ..P WKT 2010 06 27 08 19 55 31.3200 -97.3300 251.000 122.0 83.009 3.150 -999.990 -999.990 0.830 ..P WKT 2010 06 27 08 24 55 31.3200 -97.3300 251.000 457.0 67.285 3.310 -999.990 -999.990 0.673 ..P WKT 2010 06 27 08 34 55 31.3200 -97.3300 251.000 30.0 79.149 3.940 -999.990 -999.990 0.791 ..P WKT 2010 06 27 08 39 55 31.3200 -97.3300 251.000 122.0 87.063 3.020 -999.990 -999.990 0.871 ..P WKT 2010 06 27 08 44 55 31.3200 -97.3300 251.000 457.0 66.241 2.800 -999.990 -999.990 0.662 ..P WKT 2010 06 27 08 49 55 31.3200 -97.3300 251.000 30.0 86.569 3.170 -999.990 -999.990 0.866 ..P WKT 2010 06 27 08 54 55 31.3200 -97.3300 251.000 122.0 86.531 4.090 -999.990 -999.990 0.865 ..P WKT 2010 06 27 08 59 55 31.3200 -97.3300 251.000 457.0 70.175 3.310 -999.990 -999.990 0.702 ..P WKT 2010 06 27 09 09 55 31.3200 -97.3300 251.000 30.0 78.289 4.090 -999.990 -999.990 0.783 ..P WKT 2010 06 27 09 14 55 31.3200 -97.3300 251.000 122.0 82.255 4.020 -999.990 -999.990 0.823 ..P WKT 2010 06 27 09 19 55 31.3200 -97.3300 251.000 457.0 67.538 3.570 -999.990 -999.990 0.675 ..P WKT 2010 06 27 09 24 55 31.3200 -97.3300 251.000 30.0 79.312 3.120 -999.990 -999.990 0.793 ..P WKT 2010 06 27 09 29 55 31.3200 -97.3300 251.000 122.0 85.368 3.440 -999.990 -999.990 0.854 ..P WKT 2010 06 27 09 34 55 31.3200 -97.3300 251.000 457.0 67.447 2.870 -999.990 -999.990 0.674 ..P WKT 2010 06 27 09 44 55 31.3200 -97.3300 251.000 30.0 76.812 2.570 -999.990 -999.990 0.768 ..P WKT 2010 06 27 09 49 55 31.3200 -97.3300 251.000 122.0 82.768 3.300 -999.990 -999.990 0.828 ..P WKT 2010 06 27 09 54 55 31.3200 -97.3300 251.000 457.0 72.278 3.600 -999.990 -999.990 0.723 ..P WKT 2010 06 27 09 59 55 31.3200 -97.3300 251.000 30.0 75.724 3.360 -999.990 -999.990 0.757 ..P WKT 2010 06 27 10 04 55 31.3200 -97.3300 251.000 122.0 81.401 3.770 -999.990 -999.990 0.814 ..P WKT 2010 06 27 10 09 55 31.3200 -97.3300 251.000 457.0 67.289 3.920 -999.990 -999.990 0.673 ..P WKT 2010 06 27 10 19 55 31.3200 -97.3300 251.000 30.0 81.785 4.830 -999.990 -999.990 0.818 ..P WKT 2010 06 27 10 24 55 31.3200 -97.3300 251.000 122.0 79.180 5.100 -999.990 -999.990 0.792 ..P WKT 2010 06 27 10 29 55 31.3200 -97.3300 251.000 457.0 71.560 5.490 -999.990 -999.990 0.716 ..P WKT 2010 06 27 10 34 55 31.3200 -97.3300 251.000 30.0 81.214 5.990 -999.990 -999.990 0.812 ..P WKT 2010 06 27 10 39 55 31.3200 -97.3300 251.000 122.0 80.282 6.500 -999.990 -999.990 0.803 ..P WKT 2010 06 27 10 44 55 31.3200 -97.3300 251.000 457.0 75.170 6.680 -999.990 -999.990 0.752 ..P WKT 2010 06 27 10 54 55 31.3200 -97.3300 251.000 30.0 79.433 6.600 -999.990 -999.990 0.794 ..P WKT 2010 06 27 10 59 55 31.3200 -97.3300 251.000 122.0 85.184 6.040 -999.990 -999.990 0.852 ..P WKT 2010 06 27 11 04 55 31.3200 -97.3300 251.000 457.0 74.226 6.030 -999.990 -999.990 0.742 ..P WKT 2010 06 27 11 09 55 31.3200 -97.3300 251.000 30.0 81.926 5.250 -999.990 -999.990 0.819 ..P WKT 2010 06 27 11 14 55 31.3200 -97.3300 251.000 122.0 82.664 4.680 -999.990 -999.990 0.827 ..P WKT 2010 06 27 11 19 55 31.3200 -97.3300 251.000 457.0 74.214 4.220 -999.990 -999.990 0.742 ..P WKT 2010 06 27 11 29 55 31.3200 -97.3300 251.000 30.0 91.516 3.650 -999.990 -999.990 0.915 ..P WKT 2010 06 27 11 34 55 31.3200 -97.3300 251.000 122.0 87.480 3.530 -999.990 -999.990 0.875 ..P WKT 2010 06 27 11 39 55 31.3200 -97.3300 251.000 457.0 75.510 3.700 -999.990 -999.990 0.755 ..P WKT 2010 06 27 11 44 55 31.3200 -97.3300 251.000 30.0 86.782 3.970 -999.990 -999.990 0.868 ..P WKT 2010 06 27 11 49 55 31.3200 -97.3300 251.000 122.0 90.400 3.080 -999.990 -999.990 0.904 ..P WKT 2010 06 27 12 09 55 31.3200 -97.3300 251.000 457.0 111.174 5.100 -999.990 -999.990 1.112 ..P WKT 2010 06 27 12 10 25 31.3200 -97.3300 251.000 457.0 95.364 6.710 -999.990 -999.990 0.954 ..P WKT 2010 06 27 12 10 55 31.3200 -97.3300 251.000 457.0 80.528 3.550 -999.990 -999.990 0.805 ..P WKT 2010 06 27 12 11 25 31.3200 -97.3300 251.000 457.0 85.591 3.810 -999.990 -999.990 0.856 ..P WKT 2010 06 27 12 11 55 31.3200 -97.3300 251.000 457.0 94.132 4.270 -999.990 -999.990 0.941 ..P WKT 2010 06 27 12 12 25 31.3200 -97.3300 251.000 457.0 97.942 3.020 -999.990 -999.990 0.979 ..P WKT 2010 06 27 12 12 55 31.3200 -97.3300 251.000 457.0 97.717 4.270 -999.990 -999.990 0.977 ..P WKT 2010 06 27 12 13 25 31.3200 -97.3300 251.000 457.0 101.528 3.990 -999.990 -999.990 1.015 ..P WKT 2010 06 27 12 13 55 31.3200 -97.3300 251.000 457.0 99.076 3.320 -999.990 -999.990 0.991 ..P WKT 2010 06 27 12 14 25 31.3200 -97.3300 251.000 457.0 96.067 3.050 -999.990 -999.990 0.961 ..P WKT 2010 06 27 12 14 55 31.3200 -97.3300 251.000 457.0 91.807 5.120 -999.990 -999.990 0.918 ..P WKT 2010 06 27 12 19 55 31.3200 -97.3300 251.000 30.0 80.788 3.350 -999.990 -999.990 0.808 ..P WKT 2010 06 27 12 24 55 31.3200 -97.3300 251.000 122.0 83.405 3.200 -999.990 -999.990 0.834 ..P WKT 2010 06 27 12 29 55 31.3200 -97.3300 251.000 457.0 72.384 3.070 -999.990 -999.990 0.724 ..P WKT 2010 06 27 12 34 55 31.3200 -97.3300 251.000 30.0 77.229 3.670 -999.990 -999.990 0.772 ..P WKT 2010 06 27 12 39 55 31.3200 -97.3300 251.000 122.0 81.797 4.880 -999.990 -999.990 0.818 ..P WKT 2010 06 27 12 44 55 31.3200 -97.3300 251.000 457.0 66.734 2.940 -999.990 -999.990 0.667 ..P WKT 2010 06 27 12 54 55 31.3200 -97.3300 251.000 30.0 77.090 4.050 -999.990 -999.990 0.771 ..P WKT 2010 06 27 12 59 55 31.3200 -97.3300 251.000 122.0 77.031 3.930 -999.990 -999.990 0.770 ..P WKT 2010 06 27 13 04 55 31.3200 -97.3300 251.000 457.0 64.995 4.070 -999.990 -999.990 0.650 ..P WKT 2010 06 27 13 09 55 31.3200 -97.3300 251.000 30.0 68.137 3.280 -999.990 -999.990 0.681 ..P WKT 2010 06 27 13 14 55 31.3200 -97.3300 251.000 122.0 77.549 3.210 -999.990 -999.990 0.775 ..P WKT 2010 06 27 13 19 55 31.3200 -97.3300 251.000 457.0 69.828 3.120 -999.990 -999.990 0.698 ..P WKT 2010 06 27 13 29 55 31.3200 -97.3300 251.000 30.0 82.167 3.810 -999.990 -999.990 0.822 ..P WKT 2010 06 27 13 34 55 31.3200 -97.3300 251.000 122.0 82.028 3.470 -999.990 -999.990 0.820 ..P WKT 2010 06 27 13 39 55 31.3200 -97.3300 251.000 457.0 72.274 3.840 -999.990 -999.990 0.723 ..P WKT 2010 06 27 13 44 55 31.3200 -97.3300 251.000 30.0 80.357 4.340 -999.990 -999.990 0.804 ..P WKT 2010 06 27 13 49 55 31.3200 -97.3300 251.000 122.0 79.800 3.240 -999.990 -999.990 0.798 ..P WKT 2010 06 27 13 54 55 31.3200 -97.3300 251.000 457.0 71.995 2.700 -999.990 -999.990 0.720 ..P WKT 2010 06 27 14 04 55 31.3200 -97.3300 251.000 30.0 73.010 3.790 -999.990 -999.990 0.730 ..P WKT 2010 06 27 14 09 55 31.3200 -97.3300 251.000 122.0 77.372 3.590 -999.990 -999.990 0.774 ..P WKT 2010 06 27 14 14 55 31.3200 -97.3300 251.000 457.0 77.272 2.350 -999.990 -999.990 0.773 ..P WKT 2010 06 27 14 19 55 31.3200 -97.3300 251.000 30.0 81.635 2.350 -999.990 -999.990 0.816 ..P WKT 2010 06 27 14 24 55 31.3200 -97.3300 251.000 122.0 84.883 2.310 -999.990 -999.990 0.849 ..P WKT 2010 06 27 14 29 55 31.3200 -97.3300 251.000 457.0 78.090 3.750 -999.990 -999.990 0.781 ..P WKT 2010 06 27 14 39 55 31.3200 -97.3300 251.000 30.0 82.912 2.560 -999.990 -999.990 0.829 ..P WKT 2010 06 27 14 44 55 31.3200 -97.3300 251.000 122.0 83.929 3.760 -999.990 -999.990 0.839 ..P WKT 2010 06 27 14 49 55 31.3200 -97.3300 251.000 457.0 88.853 3.720 -999.990 -999.990 0.889 ..P WKT 2010 06 27 14 54 55 31.3200 -97.3300 251.000 30.0 82.615 2.500 -999.990 -999.990 0.826 ..P WKT 2010 06 27 14 59 55 31.3200 -97.3300 251.000 122.0 93.399 2.720 -999.990 -999.990 0.934 ..P WKT 2010 06 27 15 04 55 31.3200 -97.3300 251.000 457.0 85.766 2.630 -999.990 -999.990 0.858 ..P WKT 2010 06 27 15 14 55 31.3200 -97.3300 251.000 30.0 83.097 3.030 -999.990 -999.990 0.831 ..P WKT 2010 06 27 15 19 55 31.3200 -97.3300 251.000 122.0 90.574 2.510 -999.990 -999.990 0.906 ..P WKT 2010 06 27 15 24 55 31.3200 -97.3300 251.000 457.0 85.770 2.690 -999.990 -999.990 0.858 ..P WKT 2010 06 27 15 29 55 31.3200 -97.3300 251.000 30.0 87.107 3.020 -999.990 -999.990 0.871 ..P WKT 2010 06 27 15 34 55 31.3200 -97.3300 251.000 122.0 92.213 2.980 -999.990 -999.990 0.922 ..P WKT 2010 06 27 15 39 55 31.3200 -97.3300 251.000 457.0 87.826 3.190 -999.990 -999.990 0.878 ..P WKT 2010 06 27 15 49 55 31.3200 -97.3300 251.000 30.0 90.103 2.750 -999.990 -999.990 0.901 ..P WKT 2010 06 27 15 54 55 31.3200 -97.3300 251.000 122.0 96.907 2.700 -999.990 -999.990 0.969 ..P WKT 2010 06 27 15 59 55 31.3200 -97.3300 251.000 457.0 88.490 2.890 -999.990 -999.990 0.885 ..P WKT 2010 06 27 16 04 55 31.3200 -97.3300 251.000 30.0 87.194 3.560 -999.990 -999.990 0.872 ..P WKT 2010 06 27 16 09 55 31.3200 -97.3300 251.000 122.0 91.904 2.850 -999.990 -999.990 0.919 ..P WKT 2010 06 27 16 14 55 31.3200 -97.3300 251.000 457.0 85.021 3.340 -999.990 -999.990 0.850 ..P WKT 2010 06 27 16 24 55 31.3200 -97.3300 251.000 30.0 86.220 2.940 -999.990 -999.990 0.862 ..P WKT 2010 06 27 16 29 55 31.3200 -97.3300 251.000 122.0 88.018 3.290 -999.990 -999.990 0.880 ..P WKT 2010 06 27 16 34 55 31.3200 -97.3300 251.000 457.0 82.549 3.000 -999.990 -999.990 0.825 ..P WKT 2010 06 27 16 39 55 31.3200 -97.3300 251.000 30.0 83.228 3.330 -999.990 -999.990 0.832 ..P WKT 2010 06 27 16 44 55 31.3200 -97.3300 251.000 122.0 96.207 3.090 -999.990 -999.990 0.962 ..P WKT 2010 06 27 16 49 55 31.3200 -97.3300 251.000 457.0 84.169 3.050 -999.990 -999.990 0.842 ..P WKT 2010 06 27 17 04 55 31.3200 -97.3300 251.000 30.0 82.304 2.920 -999.990 -999.990 0.823 ..P WKT 2010 06 27 17 09 55 31.3200 -97.3300 251.000 122.0 94.313 3.140 -999.990 -999.990 0.943 ..P WKT 2010 06 27 17 14 55 31.3200 -97.3300 251.000 457.0 84.372 2.630 -999.990 -999.990 0.844 ..P WKT 2010 06 27 17 19 55 31.3200 -97.3300 251.000 30.0 89.252 2.720 -999.990 -999.990 0.893 ..P WKT 2010 06 27 17 24 55 31.3200 -97.3300 251.000 122.0 99.168 2.920 -999.990 -999.990 0.992 ..P WKT 2010 06 27 17 29 55 31.3200 -97.3300 251.000 457.0 91.602 2.410 -999.990 -999.990 0.916 ..P WKT 2010 06 27 17 39 55 31.3200 -97.3300 251.000 30.0 92.969 3.600 -999.990 -999.990 0.930 ..P WKT 2010 06 27 17 44 55 31.3200 -97.3300 251.000 122.0 94.070 2.380 -999.990 -999.990 0.941 ..P WKT 2010 06 27 17 49 55 31.3200 -97.3300 251.000 457.0 94.611 2.230 -999.990 -999.990 0.946 ..P WKT 2010 06 27 17 54 55 31.3200 -97.3300 251.000 30.0 87.317 3.420 -999.990 -999.990 0.873 ..P WKT 2010 06 27 17 59 55 31.3200 -97.3300 251.000 122.0 97.373 2.440 -999.990 -999.990 0.974 ..P WKT 2010 06 27 18 04 55 31.3200 -97.3300 251.000 457.0 89.239 2.360 -999.990 -999.990 0.892 ..P WKT 2010 06 27 18 14 55 31.3200 -97.3300 251.000 30.0 92.719 2.570 -999.990 -999.990 0.927 ..P WKT 2010 06 27 18 19 55 31.3200 -97.3300 251.000 122.0 95.101 3.530 -999.990 -999.990 0.951 ..P WKT 2010 06 27 18 24 55 31.3200 -97.3300 251.000 457.0 93.283 3.120 -999.990 -999.990 0.933 ..P WKT 2010 06 27 18 29 55 31.3200 -97.3300 251.000 30.0 88.944 3.800 -999.990 -999.990 0.889 ..P WKT 2010 06 27 18 34 55 31.3200 -97.3300 251.000 122.0 98.046 4.070 -999.990 -999.990 0.980 ..P WKT 2010 06 27 18 39 55 31.3200 -97.3300 251.000 457.0 87.827 4.690 -999.990 -999.990 0.878 ..P WKT 2010 06 27 18 49 55 31.3200 -97.3300 251.000 30.0 89.469 5.570 -999.990 -999.990 0.895 ..P WKT 2010 06 27 18 54 55 31.3200 -97.3300 251.000 122.0 90.691 5.010 -999.990 -999.990 0.907 ..P WKT 2010 06 27 18 59 55 31.3200 -97.3300 251.000 457.0 90.792 4.760 -999.990 -999.990 0.908 ..P WKT 2010 06 27 19 04 55 31.3200 -97.3300 251.000 30.0 87.812 5.310 -999.990 -999.990 0.878 ..P WKT 2010 06 27 19 09 55 31.3200 -97.3300 251.000 122.0 93.796 3.990 -999.990 -999.990 0.938 ..P WKT 2010 06 27 19 14 55 31.3200 -97.3300 251.000 457.0 86.613 3.430 -999.990 -999.990 0.866 ..P WKT 2010 06 27 19 24 55 31.3200 -97.3300 251.000 30.0 93.621 3.580 -999.990 -999.990 0.936 ..P WKT 2010 06 27 19 29 55 31.3200 -97.3300 251.000 122.0 103.471 4.250 -999.990 -999.990 1.035 ..P WKT 2010 06 27 19 34 55 31.3200 -97.3300 251.000 457.0 85.857 2.710 -999.990 -999.990 0.859 ..P WKT 2010 06 27 19 39 55 31.3200 -97.3300 251.000 30.0 86.458 4.280 -999.990 -999.990 0.865 ..P WKT 2010 06 27 19 44 55 31.3200 -97.3300 251.000 122.0 99.253 1.980 -999.990 -999.990 0.993 ..P WKT 2010 06 27 19 49 55 31.3200 -97.3300 251.000 457.0 88.083 1.980 -999.990 -999.990 0.881 ..P WKT 2010 06 27 19 59 55 31.3200 -97.3300 251.000 30.0 90.568 2.640 -999.990 -999.990 0.906 ..P WKT 2010 06 27 20 04 55 31.3200 -97.3300 251.000 122.0 92.172 2.610 -999.990 -999.990 0.922 ..P WKT 2010 06 27 20 09 55 31.3200 -97.3300 251.000 457.0 84.241 2.070 -999.990 -999.990 0.842 ..P WKT 2010 06 27 20 14 55 31.3200 -97.3300 251.000 30.0 86.546 3.500 -999.990 -999.990 0.865 ..P WKT 2010 06 27 20 19 55 31.3200 -97.3300 251.000 122.0 90.113 3.700 -999.990 -999.990 0.901 ..P WKT 2010 06 27 20 24 55 31.3200 -97.3300 251.000 457.0 80.778 2.780 -999.990 -999.990 0.808 ..P WKT 2010 06 27 20 34 55 31.3200 -97.3300 251.000 30.0 82.843 5.440 -999.990 -999.990 0.828 ..P WKT 2010 06 27 20 39 55 31.3200 -97.3300 251.000 122.0 92.142 2.770 -999.990 -999.990 0.921 ..P WKT 2010 06 27 20 44 55 31.3200 -97.3300 251.000 457.0 80.961 3.230 -999.990 -999.990 0.810 ..P WKT 2010 06 27 20 49 55 31.3200 -97.3300 251.000 30.0 84.789 2.580 -999.990 -999.990 0.848 ..P WKT 2010 06 27 20 54 55 31.3200 -97.3300 251.000 122.0 83.287 5.250 -999.990 -999.990 0.833 ..P WKT 2010 06 27 20 59 55 31.3200 -97.3300 251.000 457.0 84.030 3.680 -999.990 -999.990 0.840 ..P WKT 2010 06 27 21 09 55 31.3200 -97.3300 251.000 30.0 86.477 2.310 -999.990 -999.990 0.865 ..P WKT 2010 06 27 21 14 55 31.3200 -97.3300 251.000 122.0 85.937 2.650 -999.990 -999.990 0.859 ..P WKT 2010 06 27 21 19 55 31.3200 -97.3300 251.000 457.0 83.572 2.390 -999.990 -999.990 0.836 ..P WKT 2010 06 27 21 24 55 31.3200 -97.3300 251.000 30.0 82.049 2.410 -999.990 -999.990 0.820 ..P WKT 2010 06 27 21 29 55 31.3200 -97.3300 251.000 122.0 93.441 1.920 -999.990 -999.990 0.934 ..P WKT 2010 06 27 21 34 55 31.3200 -97.3300 251.000 457.0 80.265 3.230 -999.990 -999.990 0.803 ..P WKT 2010 06 27 21 44 55 31.3200 -97.3300 251.000 30.0 89.854 2.700 -999.990 -999.990 0.899 ..P WKT 2010 06 27 21 49 55 31.3200 -97.3300 251.000 122.0 89.314 4.190 -999.990 -999.990 0.893 ..P WKT 2010 06 27 21 54 55 31.3200 -97.3300 251.000 457.0 89.054 2.560 -999.990 -999.990 0.891 ..P WKT 2010 06 27 21 59 55 31.3200 -97.3300 251.000 30.0 89.357 2.540 -999.990 -999.990 0.894 ..P WKT 2010 06 27 22 04 55 31.3200 -97.3300 251.000 122.0 99.210 2.380 -999.990 -999.990 0.992 ..P WKT 2010 06 27 22 09 55 31.3200 -97.3300 251.000 457.0 85.466 3.710 -999.990 -999.990 0.855 ..P WKT 2010 06 27 22 19 55 31.3200 -97.3300 251.000 30.0 87.194 2.780 -999.990 -999.990 0.872 ..P WKT 2010 06 27 22 24 55 31.3200 -97.3300 251.000 122.0 92.274 2.650 -999.990 -999.990 0.923 ..P WKT 2010 06 27 22 29 55 31.3200 -97.3300 251.000 457.0 86.113 3.250 -999.990 -999.990 0.861 ..P WKT 2010 06 27 22 34 55 31.3200 -97.3300 251.000 30.0 93.441 3.100 -999.990 -999.990 0.934 ..P WKT 2010 06 27 22 39 55 31.3200 -97.3300 251.000 122.0 94.868 2.470 -999.990 -999.990 0.949 ..P WKT 2010 06 27 22 44 55 31.3200 -97.3300 251.000 457.0 87.581 2.760 -999.990 -999.990 0.876 ..P WKT 2010 06 27 22 54 55 31.3200 -97.3300 251.000 30.0 84.572 2.130 -999.990 -999.990 0.846 ..P WKT 2010 06 27 22 59 55 31.3200 -97.3300 251.000 122.0 100.659 3.180 -999.990 -999.990 1.007 ..P WKT 2010 06 27 23 04 55 31.3200 -97.3300 251.000 457.0 96.222 3.170 -999.990 -999.990 0.962 ..P WKT 2010 06 27 23 09 55 31.3200 -97.3300 251.000 30.0 92.067 2.300 -999.990 -999.990 0.921 ..P WKT 2010 06 27 23 14 55 31.3200 -97.3300 251.000 122.0 95.222 1.790 -999.990 -999.990 0.952 ..P WKT 2010 06 27 23 19 55 31.3200 -97.3300 251.000 457.0 93.737 2.970 -999.990 -999.990 0.937 ..P WKT 2010 06 27 23 29 55 31.3200 -97.3300 251.000 30.0 91.289 1.960 -999.990 -999.990 0.913 ..P WKT 2010 06 27 23 34 55 31.3200 -97.3300 251.000 122.0 88.216 3.400 -999.990 -999.990 0.882 ..P WKT 2010 06 27 23 39 55 31.3200 -97.3300 251.000 457.0 96.116 3.490 -999.990 -999.990 0.961 ..P WKT 2010 06 27 23 44 55 31.3200 -97.3300 251.000 30.0 91.214 2.870 -999.990 -999.990 0.912 ..P WKT 2010 06 27 23 49 55 31.3200 -97.3300 251.000 122.0 93.909 2.520 -999.990 -999.990 0.939 ..P WKT 2010 06 28 00 09 55 31.3200 -97.3300 251.000 457.0 98.557 2.700 -999.990 -999.990 0.986 ..P WKT 2010 06 28 00 10 25 31.3200 -97.3300 251.000 457.0 89.958 4.180 -999.990 -999.990 0.900 ..P WKT 2010 06 28 00 10 55 31.3200 -97.3300 251.000 457.0 86.565 3.100 -999.990 -999.990 0.866 ..P WKT 2010 06 28 00 11 25 31.3200 -97.3300 251.000 457.0 91.474 2.630 -999.990 -999.990 0.915 ..P WKT 2010 06 28 00 11 55 31.3200 -97.3300 251.000 457.0 82.171 3.800 -999.990 -999.990 0.822 ..P WKT 2010 06 28 00 12 25 31.3200 -97.3300 251.000 457.0 85.391 3.050 -999.990 -999.990 0.854 ..P WKT 2010 06 28 00 12 55 31.3200 -97.3300 251.000 457.0 78.903 2.960 -999.990 -999.990 0.789 ..P WKT 2010 06 28 00 13 25 31.3200 -97.3300 251.000 457.0 81.420 3.460 -999.990 -999.990 0.814 ..P WKT 2010 06 28 00 13 55 31.3200 -97.3300 251.000 457.0 82.952 3.370 -999.990 -999.990 0.830 ..P WKT 2010 06 28 00 14 25 31.3200 -97.3300 251.000 457.0 90.112 2.430 -999.990 -999.990 0.901 ..P WKT 2010 06 28 00 14 55 31.3200 -97.3300 251.000 457.0 87.563 2.580 -999.990 -999.990 0.876 ..P WKT 2010 06 28 00 19 55 31.3200 -97.3300 251.000 30.0 82.198 2.710 -999.990 -999.990 0.822 ..P WKT 2010 06 28 00 24 55 31.3200 -97.3300 251.000 122.0 88.934 2.580 -999.990 -999.990 0.889 ..P WKT 2010 06 28 00 29 55 31.3200 -97.3300 251.000 457.0 84.554 2.750 -999.990 -999.990 0.846 ..P WKT 2010 06 28 00 34 55 31.3200 -97.3300 251.000 30.0 84.818 3.090 -999.990 -999.990 0.848 ..P WKT 2010 06 28 00 39 55 31.3200 -97.3300 251.000 122.0 98.307 3.410 -999.990 -999.990 0.983 ..P WKT 2010 06 28 00 44 55 31.3200 -97.3300 251.000 457.0 86.611 3.690 -999.990 -999.990 0.866 ..P WKT 2010 06 28 00 54 55 31.3200 -97.3300 251.000 30.0 85.062 3.160 -999.990 -999.990 0.851 ..P WKT 2010 06 28 00 59 55 31.3200 -97.3300 251.000 122.0 96.054 3.550 -999.990 -999.990 0.961 ..P WKT 2010 06 28 01 04 55 31.3200 -97.3300 251.000 457.0 91.992 2.930 -999.990 -999.990 0.920 ..P WKT 2010 06 28 01 09 55 31.3200 -97.3300 251.000 30.0 96.794 4.180 -999.990 -999.990 0.968 ..P WKT 2010 06 28 01 14 55 31.3200 -97.3300 251.000 122.0 96.811 2.850 -999.990 -999.990 0.968 ..P WKT 2010 06 28 01 19 55 31.3200 -97.3300 251.000 457.0 87.403 1.820 -999.990 -999.990 0.874 ..P WKT 2010 06 28 01 29 55 31.3200 -97.3300 251.000 30.0 94.271 2.290 -999.990 -999.990 0.943 ..P WKT 2010 06 28 01 34 55 31.3200 -97.3300 251.000 122.0 96.198 4.270 -999.990 -999.990 0.962 ..P WKT 2010 06 28 01 39 55 31.3200 -97.3300 251.000 457.0 96.155 3.570 -999.990 -999.990 0.962 ..P WKT 2010 06 28 01 44 55 31.3200 -97.3300 251.000 30.0 102.020 3.470 -999.990 -999.990 1.020 ..P WKT 2010 06 28 01 49 55 31.3200 -97.3300 251.000 122.0 96.914 3.230 -999.990 -999.990 0.969 ..P WKT 2010 06 28 01 54 55 31.3200 -97.3300 251.000 457.0 94.902 2.370 -999.990 -999.990 0.949 ..P WKT 2010 06 28 02 04 55 31.3200 -97.3300 251.000 30.0 109.325 2.620 -999.990 -999.990 1.093 ..P WKT 2010 06 28 02 09 55 31.3200 -97.3300 251.000 122.0 99.596 4.920 -999.990 -999.990 0.996 ..P WKT 2010 06 28 02 14 55 31.3200 -97.3300 251.000 457.0 88.742 3.290 -999.990 -999.990 0.887 ..P WKT 2010 06 28 02 19 55 31.3200 -97.3300 251.000 30.0 100.395 3.380 -999.990 -999.990 1.004 ..P WKT 2010 06 28 02 24 55 31.3200 -97.3300 251.000 122.0 92.073 3.010 -999.990 -999.990 0.921 ..P WKT 2010 06 28 02 29 55 31.3200 -97.3300 251.000 457.0 89.659 3.320 -999.990 -999.990 0.897 ..P WKT 2010 06 28 02 39 55 31.3200 -97.3300 251.000 30.0 98.375 3.650 -999.990 -999.990 0.984 ..P WKT 2010 06 28 02 44 55 31.3200 -97.3300 251.000 122.0 83.905 3.730 -999.990 -999.990 0.839 ..P WKT 2010 06 28 02 49 55 31.3200 -97.3300 251.000 457.0 90.534 3.310 -999.990 -999.990 0.905 ..P WKT 2010 06 28 02 54 55 31.3200 -97.3300 251.000 30.0 95.474 3.270 -999.990 -999.990 0.955 ..P WKT 2010 06 28 02 59 55 31.3200 -97.3300 251.000 122.0 89.725 3.310 -999.990 -999.990 0.897 ..P WKT 2010 06 28 03 04 55 31.3200 -97.3300 251.000 457.0 92.415 3.460 -999.990 -999.990 0.924 ..P WKT 2010 06 28 03 14 55 31.3200 -97.3300 251.000 30.0 99.121 3.110 -999.990 -999.990 0.991 ..P WKT 2010 06 28 03 19 55 31.3200 -97.3300 251.000 122.0 90.198 3.110 -999.990 -999.990 0.902 ..P WKT 2010 06 28 03 24 55 31.3200 -97.3300 251.000 457.0 88.166 2.710 -999.990 -999.990 0.882 ..P WKT 2010 06 28 03 29 55 31.3200 -97.3300 251.000 30.0 93.588 2.940 -999.990 -999.990 0.936 ..P WKT 2010 06 28 03 34 55 31.3200 -97.3300 251.000 122.0 87.197 3.520 -999.990 -999.990 0.872 ..P WKT 2010 06 28 03 39 55 31.3200 -97.3300 251.000 457.0 93.041 2.460 -999.990 -999.990 0.930 ..P WKT 2010 06 28 03 49 55 31.3200 -97.3300 251.000 30.0 91.690 2.330 -999.990 -999.990 0.917 ..P WKT 2010 06 28 03 54 55 31.3200 -97.3300 251.000 122.0 92.651 2.710 -999.990 -999.990 0.927 ..P WKT 2010 06 28 03 59 55 31.3200 -97.3300 251.000 457.0 97.129 3.620 -999.990 -999.990 0.971 ..P WKT 2010 06 28 04 04 55 31.3200 -97.3300 251.000 30.0 85.716 2.690 -999.990 -999.990 0.857 ..P WKT 2010 06 28 04 09 55 31.3200 -97.3300 251.000 122.0 90.756 2.310 -999.990 -999.990 0.908 ..P WKT 2010 06 28 04 14 55 31.3200 -97.3300 251.000 457.0 89.468 2.030 -999.990 -999.990 0.895 ..P WKT 2010 06 28 04 24 55 31.3200 -97.3300 251.000 30.0 96.935 2.390 -999.990 -999.990 0.969 ..P WKT 2010 06 28 04 29 55 31.3200 -97.3300 251.000 122.0 94.020 2.860 -999.990 -999.990 0.940 ..P WKT 2010 06 28 04 34 55 31.3200 -97.3300 251.000 457.0 90.965 4.430 -999.990 -999.990 0.910 ..P WKT 2010 06 28 04 39 55 31.3200 -97.3300 251.000 30.0 97.751 2.560 -999.990 -999.990 0.978 ..P WKT 2010 06 28 04 44 55 31.3200 -97.3300 251.000 122.0 100.038 2.560 -999.990 -999.990 1.000 ..P WKT 2010 06 28 04 49 55 31.3200 -97.3300 251.000 457.0 92.483 2.110 -999.990 -999.990 0.925 ..P WKT 2010 06 28 05 04 55 31.3200 -97.3300 251.000 30.0 100.319 2.280 -999.990 -999.990 1.003 ..P WKT 2010 06 28 05 09 55 31.3200 -97.3300 251.000 122.0 98.032 2.920 -999.990 -999.990 0.980 ..P WKT 2010 06 28 05 14 55 31.3200 -97.3300 251.000 457.0 81.967 4.810 -999.990 -999.990 0.820 ..P WKT 2010 06 28 05 19 55 31.3200 -97.3300 251.000 30.0 90.927 4.580 -999.990 -999.990 0.909 ..P WKT 2010 06 28 05 24 55 31.3200 -97.3300 251.000 122.0 93.701 3.950 -999.990 -999.990 0.937 ..P WKT 2010 06 28 05 29 55 31.3200 -97.3300 251.000 457.0 80.449 3.580 -999.990 -999.990 0.804 ..P WKT 2010 06 28 05 39 55 31.3200 -97.3300 251.000 30.0 86.434 3.860 -999.990 -999.990 0.864 ..P WKT 2010 06 28 05 44 55 31.3200 -97.3300 251.000 122.0 91.893 3.970 -999.990 -999.990 0.919 ..P WKT 2010 06 28 05 49 55 31.3200 -97.3300 251.000 457.0 85.546 5.040 -999.990 -999.990 0.855 ..P WKT 2010 06 28 05 54 55 31.3200 -97.3300 251.000 30.0 100.283 6.590 -999.990 -999.990 1.003 ..P WKT 2010 06 28 05 59 55 31.3200 -97.3300 251.000 122.0 99.838 5.630 -999.990 -999.990 0.998 ..P WKT 2010 06 28 06 04 55 31.3200 -97.3300 251.000 457.0 87.587 3.700 -999.990 -999.990 0.876 ..P WKT 2010 06 28 06 14 55 31.3200 -97.3300 251.000 30.0 97.260 4.080 -999.990 -999.990 0.973 ..P WKT 2010 06 28 06 19 55 31.3200 -97.3300 251.000 122.0 91.916 6.220 -999.990 -999.990 0.919 ..P WKT 2010 06 28 06 24 55 31.3200 -97.3300 251.000 457.0 77.296 6.610 -999.990 -999.990 0.773 ..P WKT 2010 06 28 06 29 55 31.3200 -97.3300 251.000 30.0 86.008 6.270 -999.990 -999.990 0.860 ..P WKT 2010 06 28 06 34 55 31.3200 -97.3300 251.000 122.0 94.439 4.690 -999.990 -999.990 0.944 ..P WKT 2010 06 28 06 39 55 31.3200 -97.3300 251.000 457.0 74.198 3.010 -999.990 -999.990 0.742 ..P WKT 2010 06 28 06 49 55 31.3200 -97.3300 251.000 30.0 88.529 3.200 -999.990 -999.990 0.885 ..P WKT 2010 06 28 06 54 55 31.3200 -97.3300 251.000 122.0 96.678 4.620 -999.990 -999.990 0.967 ..P WKT 2010 06 28 06 59 55 31.3200 -97.3300 251.000 457.0 84.308 5.590 -999.990 -999.990 0.843 ..P WKT 2010 06 28 07 04 55 31.3200 -97.3300 251.000 30.0 92.456 6.100 -999.990 -999.990 0.925 ..P WKT 2010 06 28 07 09 55 31.3200 -97.3300 251.000 122.0 89.924 3.500 -999.990 -999.990 0.899 ..P WKT 2010 06 28 07 14 55 31.3200 -97.3300 251.000 457.0 79.663 4.060 -999.990 -999.990 0.797 ..P WKT 2010 06 28 07 24 55 31.3200 -97.3300 251.000 30.0 91.041 3.840 -999.990 -999.990 0.910 ..P WKT 2010 06 28 07 29 55 31.3200 -97.3300 251.000 122.0 92.163 3.460 -999.990 -999.990 0.922 ..P WKT 2010 06 28 07 34 55 31.3200 -97.3300 251.000 457.0 77.827 4.070 -999.990 -999.990 0.778 ..P WKT 2010 06 28 07 39 55 31.3200 -97.3300 251.000 30.0 86.256 4.110 -999.990 -999.990 0.863 ..P WKT 2010 06 28 07 44 55 31.3200 -97.3300 251.000 122.0 84.849 4.440 -999.990 -999.990 0.848 ..P WKT 2010 06 28 07 49 55 31.3200 -97.3300 251.000 457.0 74.167 3.380 -999.990 -999.990 0.742 ..P WKT 2010 06 28 07 59 55 31.3200 -97.3300 251.000 30.0 86.247 2.970 -999.990 -999.990 0.862 ..P WKT 2010 06 28 08 04 55 31.3200 -97.3300 251.000 122.0 89.335 3.840 -999.990 -999.990 0.893 ..P WKT 2010 06 28 08 09 55 31.3200 -97.3300 251.000 457.0 72.472 4.040 -999.990 -999.990 0.725 ..P WKT 2010 06 28 08 14 55 31.3200 -97.3300 251.000 30.0 87.223 3.850 -999.990 -999.990 0.872 ..P WKT 2010 06 28 08 19 55 31.3200 -97.3300 251.000 122.0 88.906 3.350 -999.990 -999.990 0.889 ..P WKT 2010 06 28 08 24 55 31.3200 -97.3300 251.000 457.0 74.853 3.700 -999.990 -999.990 0.749 ..P WKT 2010 06 28 08 34 55 31.3200 -97.3300 251.000 30.0 90.886 3.360 -999.990 -999.990 0.909 ..P WKT 2010 06 28 08 39 55 31.3200 -97.3300 251.000 122.0 86.548 3.380 -999.990 -999.990 0.865 ..P WKT 2010 06 28 08 44 55 31.3200 -97.3300 251.000 457.0 77.996 2.890 -999.990 -999.990 0.780 ..P WKT 2010 06 28 08 49 55 31.3200 -97.3300 251.000 30.0 89.253 2.790 -999.990 -999.990 0.893 ..P WKT 2010 06 28 08 54 55 31.3200 -97.3300 251.000 122.0 86.461 2.190 -999.990 -999.990 0.865 ..P WKT 2010 06 28 08 59 55 31.3200 -97.3300 251.000 457.0 78.751 2.540 -999.990 -999.990 0.788 ..P WKT 2010 06 28 09 09 55 31.3200 -97.3300 251.000 30.0 83.202 2.120 -999.990 -999.990 0.832 ..P WKT 2010 06 28 09 14 55 31.3200 -97.3300 251.000 122.0 85.669 2.760 -999.990 -999.990 0.857 ..P WKT 2010 06 28 09 19 55 31.3200 -97.3300 251.000 457.0 72.401 1.940 -999.990 -999.990 0.724 ..P WKT 2010 06 28 09 24 55 31.3200 -97.3300 251.000 30.0 87.229 2.920 -999.990 -999.990 0.872 ..P WKT 2010 06 28 09 29 55 31.3200 -97.3300 251.000 122.0 90.819 2.430 -999.990 -999.990 0.908 ..P WKT 2010 06 28 09 34 55 31.3200 -97.3300 251.000 457.0 75.585 2.280 -999.990 -999.990 0.756 ..P WKT 2010 06 28 09 44 55 31.3200 -97.3300 251.000 30.0 82.664 2.680 -999.990 -999.990 0.827 ..P WKT 2010 06 28 09 49 55 31.3200 -97.3300 251.000 122.0 92.054 2.560 -999.990 -999.990 0.921 ..P WKT 2010 06 28 09 54 55 31.3200 -97.3300 251.000 457.0 77.282 2.460 -999.990 -999.990 0.773 ..P WKT 2010 06 28 09 59 55 31.3200 -97.3300 251.000 30.0 86.671 2.810 -999.990 -999.990 0.867 ..P WKT 2010 06 28 10 04 55 31.3200 -97.3300 251.000 122.0 94.093 3.280 -999.990 -999.990 0.941 ..P WKT 2010 06 28 10 09 55 31.3200 -97.3300 251.000 457.0 79.041 3.810 -999.990 -999.990 0.790 ..P WKT 2010 06 28 10 19 55 31.3200 -97.3300 251.000 30.0 84.173 2.810 -999.990 -999.990 0.842 ..P WKT 2010 06 28 10 24 55 31.3200 -97.3300 251.000 122.0 87.501 2.780 -999.990 -999.990 0.875 ..P WKT 2010 06 28 10 29 55 31.3200 -97.3300 251.000 457.0 79.594 2.520 -999.990 -999.990 0.796 ..P WKT 2010 06 28 10 34 55 31.3200 -97.3300 251.000 30.0 82.641 2.090 -999.990 -999.990 0.826 ..P WKT 2010 06 28 10 39 55 31.3200 -97.3300 251.000 122.0 88.779 1.930 -999.990 -999.990 0.888 ..P WKT 2010 06 28 10 44 55 31.3200 -97.3300 251.000 457.0 71.320 2.140 -999.990 -999.990 0.713 ..P WKT 2010 06 28 10 54 55 31.3200 -97.3300 251.000 30.0 84.518 3.360 -999.990 -999.990 0.845 ..P WKT 2010 06 28 10 59 55 31.3200 -97.3300 251.000 122.0 84.837 2.140 -999.990 -999.990 0.848 ..P WKT 2010 06 28 11 04 55 31.3200 -97.3300 251.000 457.0 74.482 2.260 -999.990 -999.990 0.745 ..P WKT 2010 06 28 11 09 55 31.3200 -97.3300 251.000 30.0 84.631 2.950 -999.990 -999.990 0.846 ..P WKT 2010 06 28 11 14 55 31.3200 -97.3300 251.000 122.0 93.376 4.340 -999.990 -999.990 0.934 ..P WKT 2010 06 28 11 19 55 31.3200 -97.3300 251.000 457.0 82.740 3.730 -999.990 -999.990 0.827 ..P WKT 2010 06 28 11 29 55 31.3200 -97.3300 251.000 30.0 80.512 4.240 -999.990 -999.990 0.805 ..P WKT 2010 06 28 11 34 55 31.3200 -97.3300 251.000 122.0 91.726 3.250 -999.990 -999.990 0.917 ..P WKT 2010 06 28 11 39 55 31.3200 -97.3300 251.000 457.0 78.365 3.970 -999.990 -999.990 0.784 ..P WKT 2010 06 28 11 44 55 31.3200 -97.3300 251.000 30.0 89.017 3.890 -999.990 -999.990 0.890 ..P WKT 2010 06 28 11 49 55 31.3200 -97.3300 251.000 122.0 92.789 3.260 -999.990 -999.990 0.928 ..P WKT 2010 06 28 12 09 55 31.3200 -97.3300 251.000 457.0 75.393 4.930 -999.990 -999.990 0.754 ..P WKT 2010 06 28 12 10 25 31.3200 -97.3300 251.000 457.0 73.926 3.020 -999.990 -999.990 0.739 ..P WKT 2010 06 28 12 10 55 31.3200 -97.3300 251.000 457.0 75.408 3.010 -999.990 -999.990 0.754 ..P WKT 2010 06 28 12 11 25 31.3200 -97.3300 251.000 457.0 74.503 3.180 -999.990 -999.990 0.745 ..P WKT 2010 06 28 12 11 55 31.3200 -97.3300 251.000 457.0 74.862 3.160 -999.990 -999.990 0.749 ..P WKT 2010 06 28 12 12 25 31.3200 -97.3300 251.000 457.0 72.974 2.830 -999.990 -999.990 0.730 ..P WKT 2010 06 28 12 12 55 31.3200 -97.3300 251.000 457.0 78.388 4.260 -999.990 -999.990 0.784 ..P WKT 2010 06 28 12 13 25 31.3200 -97.3300 251.000 457.0 80.011 3.550 -999.990 -999.990 0.800 ..P WKT 2010 06 28 12 13 55 31.3200 -97.3300 251.000 457.0 79.807 3.420 -999.990 -999.990 0.798 ..P WKT 2010 06 28 12 14 25 31.3200 -97.3300 251.000 457.0 79.323 3.070 -999.990 -999.990 0.793 ..P WKT 2010 06 28 12 14 55 31.3200 -97.3300 251.000 457.0 77.154 3.130 -999.990 -999.990 0.772 ..P WKT 2010 06 28 12 19 55 31.3200 -97.3300 251.000 30.0 88.605 3.240 -999.990 -999.990 0.886 ..P WKT 2010 06 28 12 24 55 31.3200 -97.3300 251.000 122.0 94.861 3.020 -999.990 -999.990 0.949 ..P WKT 2010 06 28 12 29 55 31.3200 -97.3300 251.000 457.0 82.298 2.910 -999.990 -999.990 0.823 ..P WKT 2010 06 28 12 34 55 31.3200 -97.3300 251.000 30.0 86.448 2.670 -999.990 -999.990 0.864 ..P WKT 2010 06 28 12 39 55 31.3200 -97.3300 251.000 122.0 101.412 1.820 -999.990 -999.990 1.014 ..P WKT 2010 06 28 12 44 55 31.3200 -97.3300 251.000 457.0 79.719 2.630 -999.990 -999.990 0.797 ..P WKT 2010 06 28 12 54 55 31.3200 -97.3300 251.000 30.0 87.077 1.730 -999.990 -999.990 0.871 ..P WKT 2010 06 28 12 59 55 31.3200 -97.3300 251.000 122.0 98.433 2.530 -999.990 -999.990 0.984 ..P WKT 2010 06 28 13 04 55 31.3200 -97.3300 251.000 457.0 80.011 3.180 -999.990 -999.990 0.800 ..P WKT 2010 06 28 13 09 55 31.3200 -97.3300 251.000 30.0 87.995 3.270 -999.990 -999.990 0.880 ..P WKT 2010 06 28 13 14 55 31.3200 -97.3300 251.000 122.0 98.790 2.710 -999.990 -999.990 0.988 ..P WKT 2010 06 28 13 19 55 31.3200 -97.3300 251.000 457.0 82.754 4.250 -999.990 -999.990 0.828 ..P WKT 2010 06 28 13 29 55 31.3200 -97.3300 251.000 30.0 92.163 2.480 -999.990 -999.990 0.922 ..P WKT 2010 06 28 13 34 55 31.3200 -97.3300 251.000 122.0 99.067 2.520 -999.990 -999.990 0.991 ..P WKT 2010 06 28 13 39 55 31.3200 -97.3300 251.000 457.0 86.300 3.500 -999.990 -999.990 0.863 ..P WKT 2010 06 28 13 44 55 31.3200 -97.3300 251.000 30.0 95.170 3.490 -999.990 -999.990 0.952 ..P WKT 2010 06 28 13 49 55 31.3200 -97.3300 251.000 122.0 95.611 3.460 -999.990 -999.990 0.956 ..P WKT 2010 06 28 13 54 55 31.3200 -97.3300 251.000 457.0 90.712 4.830 -999.990 -999.990 0.907 ..P WKT 2010 06 28 14 04 55 31.3200 -97.3300 251.000 30.0 98.297 2.970 -999.990 -999.990 0.983 ..P WKT 2010 06 28 14 09 55 31.3200 -97.3300 251.000 122.0 105.161 2.470 -999.990 -999.990 1.052 ..P WKT 2010 06 28 14 14 55 31.3200 -97.3300 251.000 457.0 89.823 4.690 -999.990 -999.990 0.898 ..P WKT 2010 06 28 14 19 55 31.3200 -97.3300 251.000 30.0 99.779 2.200 -999.990 -999.990 0.998 ..P WKT 2010 06 28 14 24 55 31.3200 -97.3300 251.000 122.0 104.957 2.090 -999.990 -999.990 1.050 ..P WKT 2010 06 28 14 29 55 31.3200 -97.3300 251.000 457.0 91.867 2.640 -999.990 -999.990 0.919 ..P WKT 2010 06 28 14 39 55 31.3200 -97.3300 251.000 30.0 99.855 1.650 -999.990 -999.990 0.999 ..P WKT 2010 06 28 14 44 55 31.3200 -97.3300 251.000 122.0 107.162 1.680 -999.990 -999.990 1.072 ..P WKT 2010 06 28 14 49 55 31.3200 -97.3300 251.000 457.0 95.355 1.860 -999.990 -999.990 0.954 ..P WKT 2010 06 28 14 54 55 31.3200 -97.3300 251.000 30.0 88.888 1.810 -999.990 -999.990 0.889 ..P WKT 2010 06 28 14 59 55 31.3200 -97.3300 251.000 122.0 101.256 2.600 -999.990 -999.990 1.013 ..P WKT 2010 06 28 15 04 55 31.3200 -97.3300 251.000 457.0 96.194 3.540 -999.990 -999.990 0.962 ..P WKT 2010 06 28 15 14 55 31.3200 -97.3300 251.000 30.0 94.325 2.100 -999.990 -999.990 0.943 ..P WKT 2010 06 28 15 19 55 31.3200 -97.3300 251.000 122.0 97.375 2.910 -999.990 -999.990 0.974 ..P WKT 2010 06 28 15 24 55 31.3200 -97.3300 251.000 457.0 95.928 2.130 -999.990 -999.990 0.959 ..P WKT 2010 06 28 15 29 55 31.3200 -97.3300 251.000 30.0 100.948 2.090 -999.990 -999.990 1.009 ..P WKT 2010 06 28 15 34 55 31.3200 -97.3300 251.000 122.0 114.965 2.830 -999.990 -999.990 1.150 ..P WKT 2010 06 28 15 39 55 31.3200 -97.3300 251.000 457.0 101.990 2.390 -999.990 -999.990 1.020 ..P WKT 2010 06 28 15 49 55 31.3200 -97.3300 251.000 30.0 91.864 1.690 -999.990 -999.990 0.919 ..P WKT 2010 06 28 15 54 55 31.3200 -97.3300 251.000 122.0 94.575 1.880 -999.990 -999.990 0.946 ..P WKT 2010 06 28 15 59 55 31.3200 -97.3300 251.000 457.0 90.676 1.920 -999.990 -999.990 0.907 ..P WKT 2010 06 28 16 04 55 31.3200 -97.3300 251.000 30.0 90.153 5.240 -999.990 -999.990 0.902 ..P WKT 2010 06 28 16 09 55 31.3200 -97.3300 251.000 122.0 102.566 4.330 -999.990 -999.990 1.026 ..P WKT 2010 06 28 16 14 55 31.3200 -97.3300 251.000 457.0 93.324 3.390 -999.990 -999.990 0.933 ..P WKT 2010 06 28 16 24 55 31.3200 -97.3300 251.000 30.0 89.283 2.780 -999.990 -999.990 0.893 ..P WKT 2010 06 28 16 29 55 31.3200 -97.3300 251.000 122.0 97.860 2.880 -999.990 -999.990 0.979 ..P WKT 2010 06 28 16 34 55 31.3200 -97.3300 251.000 457.0 85.343 3.150 -999.990 -999.990 0.853 ..P WKT 2010 06 28 16 39 55 31.3200 -97.3300 251.000 30.0 94.623 3.330 -999.990 -999.990 0.946 ..P WKT 2010 06 28 16 44 55 31.3200 -97.3300 251.000 122.0 104.748 5.360 -999.990 -999.990 1.047 ..P WKT 2010 06 28 16 49 55 31.3200 -97.3300 251.000 457.0 92.089 3.980 -999.990 -999.990 0.921 ..P WKT 2010 06 28 17 04 55 31.3200 -97.3300 251.000 30.0 90.080 2.640 -999.990 -999.990 0.901 ..P WKT 2010 06 28 17 09 55 31.3200 -97.3300 251.000 122.0 92.734 2.960 -999.990 -999.990 0.927 ..P WKT 2010 06 28 17 14 55 31.3200 -97.3300 251.000 457.0 90.886 2.190 -999.990 -999.990 0.909 ..P WKT 2010 06 28 17 19 55 31.3200 -97.3300 251.000 30.0 91.571 2.160 -999.990 -999.990 0.916 ..P WKT 2010 06 28 17 24 55 31.3200 -97.3300 251.000 122.0 91.973 2.020 -999.990 -999.990 0.920 ..P WKT 2010 06 28 17 29 55 31.3200 -97.3300 251.000 457.0 90.688 3.150 -999.990 -999.990 0.907 ..P WKT 2010 06 28 17 39 55 31.3200 -97.3300 251.000 30.0 96.838 2.900 -999.990 -999.990 0.968 ..P WKT 2010 06 28 17 44 55 31.3200 -97.3300 251.000 122.0 99.772 2.790 -999.990 -999.990 0.998 ..P WKT 2010 06 28 17 49 55 31.3200 -97.3300 251.000 457.0 87.228 2.710 -999.990 -999.990 0.872 ..P WKT 2010 06 28 17 54 55 31.3200 -97.3300 251.000 30.0 92.413 4.150 -999.990 -999.990 0.924 ..P WKT 2010 06 28 17 59 55 31.3200 -97.3300 251.000 122.0 98.723 2.460 -999.990 -999.990 0.987 ..P WKT 2010 06 28 18 04 55 31.3200 -97.3300 251.000 457.0 87.586 1.730 -999.990 -999.990 0.876 ..P WKT 2010 06 28 18 14 55 31.3200 -97.3300 251.000 30.0 90.035 2.330 -999.990 -999.990 0.900 ..P WKT 2010 06 28 18 19 55 31.3200 -97.3300 251.000 122.0 99.965 2.680 -999.990 -999.990 1.000 ..P WKT 2010 06 28 18 24 55 31.3200 -97.3300 251.000 457.0 90.756 2.210 -999.990 -999.990 0.908 ..P WKT 2010 06 28 18 29 55 31.3200 -97.3300 251.000 30.0 94.212 2.180 -999.990 -999.990 0.942 ..P WKT 2010 06 28 18 34 55 31.3200 -97.3300 251.000 122.0 96.825 2.540 -999.990 -999.990 0.968 ..P WKT 2010 06 28 18 39 55 31.3200 -97.3300 251.000 457.0 85.363 2.430 -999.990 -999.990 0.854 ..P WKT 2010 06 28 18 49 55 31.3200 -97.3300 251.000 30.0 96.721 2.530 -999.990 -999.990 0.967 ..P WKT 2010 06 28 18 54 55 31.3200 -97.3300 251.000 122.0 101.807 2.250 -999.990 -999.990 1.018 ..P WKT 2010 06 28 18 59 55 31.3200 -97.3300 251.000 457.0 90.847 3.210 -999.990 -999.990 0.908 ..P WKT 2010 06 28 19 04 55 31.3200 -97.3300 251.000 30.0 90.303 3.440 -999.990 -999.990 0.903 ..P WKT 2010 06 28 19 09 55 31.3200 -97.3300 251.000 122.0 99.752 3.130 -999.990 -999.990 0.998 ..P WKT 2010 06 28 19 14 55 31.3200 -97.3300 251.000 457.0 94.703 2.240 -999.990 -999.990 0.947 ..P WKT 2010 06 28 19 24 55 31.3200 -97.3300 251.000 30.0 92.429 3.120 -999.990 -999.990 0.924 ..P WKT 2010 06 28 19 29 55 31.3200 -97.3300 251.000 122.0 98.159 2.370 -999.990 -999.990 0.982 ..P WKT 2010 06 28 19 34 55 31.3200 -97.3300 251.000 457.0 94.739 3.260 -999.990 -999.990 0.947 ..P WKT 2010 06 28 19 39 55 31.3200 -97.3300 251.000 30.0 93.993 4.160 -999.990 -999.990 0.940 ..P WKT 2010 06 28 19 44 55 31.3200 -97.3300 251.000 122.0 101.555 2.570 -999.990 -999.990 1.016 ..P WKT 2010 06 28 19 49 55 31.3200 -97.3300 251.000 457.0 98.697 2.090 -999.990 -999.990 0.987 ..P WKT 2010 06 28 19 59 55 31.3200 -97.3300 251.000 30.0 95.657 3.270 -999.990 -999.990 0.957 ..P WKT 2010 06 28 20 04 55 31.3200 -97.3300 251.000 122.0 98.291 3.340 -999.990 -999.990 0.983 ..P WKT 2010 06 28 20 09 55 31.3200 -97.3300 251.000 457.0 90.505 2.990 -999.990 -999.990 0.905 ..P WKT 2010 06 28 20 14 55 31.3200 -97.3300 251.000 30.0 85.535 2.780 -999.990 -999.990 0.855 ..P WKT 2010 06 28 20 19 55 31.3200 -97.3300 251.000 122.0 95.491 3.050 -999.990 -999.990 0.955 ..P WKT 2010 06 28 20 24 55 31.3200 -97.3300 251.000 457.0 84.325 3.640 -999.990 -999.990 0.843 ..P WKT 2010 06 28 20 34 55 31.3200 -97.3300 251.000 30.0 78.346 3.650 -999.990 -999.990 0.783 ..P WKT 2010 06 28 20 39 55 31.3200 -97.3300 251.000 122.0 88.323 3.410 -999.990 -999.990 0.883 ..P WKT 2010 06 28 20 44 55 31.3200 -97.3300 251.000 457.0 84.077 2.900 -999.990 -999.990 0.841 ..P WKT 2010 06 28 20 49 55 31.3200 -97.3300 251.000 30.0 86.872 2.700 -999.990 -999.990 0.869 ..P WKT 2010 06 28 20 54 55 31.3200 -97.3300 251.000 122.0 94.174 2.420 -999.990 -999.990 0.942 ..P WKT 2010 06 28 20 59 55 31.3200 -97.3300 251.000 457.0 84.575 2.240 -999.990 -999.990 0.846 ..P WKT 2010 06 28 21 09 55 31.3200 -97.3300 251.000 30.0 84.914 2.200 -999.990 -999.990 0.849 ..P WKT 2010 06 28 21 14 55 31.3200 -97.3300 251.000 122.0 89.782 4.190 -999.990 -999.990 0.898 ..P WKT 2010 06 28 21 19 55 31.3200 -97.3300 251.000 457.0 81.973 2.600 -999.990 -999.990 0.820 ..P WKT 2010 06 28 21 24 55 31.3200 -97.3300 251.000 30.0 83.460 2.920 -999.990 -999.990 0.835 ..P WKT 2010 06 28 21 29 55 31.3200 -97.3300 251.000 122.0 92.555 3.160 -999.990 -999.990 0.926 ..P WKT 2010 06 28 21 34 55 31.3200 -97.3300 251.000 457.0 86.435 2.000 -999.990 -999.990 0.864 ..P WKT 2010 06 28 21 44 55 31.3200 -97.3300 251.000 30.0 86.231 3.880 -999.990 -999.990 0.862 ..P WKT 2010 06 28 21 49 55 31.3200 -97.3300 251.000 122.0 93.274 1.890 -999.990 -999.990 0.933 ..P WKT 2010 06 28 21 54 55 31.3200 -97.3300 251.000 457.0 89.891 3.650 -999.990 -999.990 0.899 ..P WKT 2010 06 28 21 59 55 31.3200 -97.3300 251.000 30.0 82.845 3.000 -999.990 -999.990 0.828 ..P WKT 2010 06 28 22 04 55 31.3200 -97.3300 251.000 122.0 96.088 2.530 -999.990 -999.990 0.961 ..P WKT 2010 06 28 22 09 55 31.3200 -97.3300 251.000 457.0 85.801 3.340 -999.990 -999.990 0.858 ..P WKT 2010 06 28 22 19 55 31.3200 -97.3300 251.000 30.0 75.188 2.290 -999.990 -999.990 0.752 ..P WKT 2010 06 28 22 24 55 31.3200 -97.3300 251.000 122.0 92.057 2.680 -999.990 -999.990 0.921 ..P WKT 2010 06 28 22 29 55 31.3200 -97.3300 251.000 457.0 82.151 3.380 -999.990 -999.990 0.822 ..P WKT 2010 06 28 22 34 55 31.3200 -97.3300 251.000 30.0 87.183 3.580 -999.990 -999.990 0.872 ..P WKT 2010 06 28 22 39 55 31.3200 -97.3300 251.000 122.0 90.664 3.490 -999.990 -999.990 0.907 ..P WKT 2010 06 28 22 44 55 31.3200 -97.3300 251.000 457.0 89.072 4.530 -999.990 -999.990 0.891 ..P WKT 2010 06 28 22 54 55 31.3200 -97.3300 251.000 30.0 79.103 2.900 -999.990 -999.990 0.791 ..P WKT 2010 06 28 22 59 55 31.3200 -97.3300 251.000 122.0 87.920 3.160 -999.990 -999.990 0.879 ..P WKT 2010 06 28 23 04 55 31.3200 -97.3300 251.000 457.0 82.502 2.680 -999.990 -999.990 0.825 ..P WKT 2010 06 28 23 09 55 31.3200 -97.3300 251.000 30.0 83.990 3.590 -999.990 -999.990 0.840 ..P WKT 2010 06 28 23 14 55 31.3200 -97.3300 251.000 122.0 91.540 2.850 -999.990 -999.990 0.915 ..P WKT 2010 06 28 23 19 55 31.3200 -97.3300 251.000 457.0 84.994 2.840 -999.990 -999.990 0.850 ..P WKT 2010 06 28 23 29 55 31.3200 -97.3300 251.000 30.0 86.745 3.680 -999.990 -999.990 0.867 ..P WKT 2010 06 28 23 34 55 31.3200 -97.3300 251.000 122.0 94.480 2.150 -999.990 -999.990 0.945 ..P WKT 2010 06 28 23 39 55 31.3200 -97.3300 251.000 457.0 88.539 2.180 -999.990 -999.990 0.885 ..P WKT 2010 06 28 23 44 55 31.3200 -97.3300 251.000 30.0 96.133 2.630 -999.990 -999.990 0.961 ..P WKT 2010 06 28 23 49 55 31.3200 -97.3300 251.000 122.0 101.190 2.990 -999.990 -999.990 1.012 ..P WKT 2010 06 29 00 09 55 31.3200 -97.3300 251.000 457.0 102.664 3.790 -999.990 -999.990 1.027 ..P WKT 2010 06 29 00 10 25 31.3200 -97.3300 251.000 457.0 94.450 5.320 -999.990 -999.990 0.945 ..P WKT 2010 06 29 00 10 55 31.3200 -97.3300 251.000 457.0 91.593 3.780 -999.990 -999.990 0.916 ..P WKT 2010 06 29 00 11 25 31.3200 -97.3300 251.000 457.0 96.348 3.050 -999.990 -999.990 0.963 ..P WKT 2010 06 29 00 11 55 31.3200 -97.3300 251.000 457.0 97.718 2.910 -999.990 -999.990 0.977 ..P WKT 2010 06 29 00 12 25 31.3200 -97.3300 251.000 457.0 94.016 2.960 -999.990 -999.990 0.940 ..P WKT 2010 06 29 00 12 55 31.3200 -97.3300 251.000 457.0 94.542 3.640 -999.990 -999.990 0.945 ..P WKT 2010 06 29 00 13 25 31.3200 -97.3300 251.000 457.0 93.658 4.020 -999.990 -999.990 0.937 ..P WKT 2010 06 29 00 13 55 31.3200 -97.3300 251.000 457.0 97.284 2.990 -999.990 -999.990 0.973 ..P WKT 2010 06 29 00 14 25 31.3200 -97.3300 251.000 457.0 93.018 3.220 -999.990 -999.990 0.930 ..P WKT 2010 06 29 00 14 55 31.3200 -97.3300 251.000 457.0 91.852 3.020 -999.990 -999.990 0.919 ..P WKT 2010 06 29 00 19 55 31.3200 -97.3300 251.000 30.0 91.752 3.230 -999.990 -999.990 0.918 ..P WKT 2010 06 29 00 24 55 31.3200 -97.3300 251.000 122.0 97.288 3.980 -999.990 -999.990 0.973 ..P WKT 2010 06 29 00 29 55 31.3200 -97.3300 251.000 457.0 96.343 4.720 -999.990 -999.990 0.963 ..P WKT 2010 06 29 00 34 55 31.3200 -97.3300 251.000 30.0 94.834 4.110 -999.990 -999.990 0.948 ..P WKT 2010 06 29 00 39 55 31.3200 -97.3300 251.000 122.0 97.832 4.130 -999.990 -999.990 0.978 ..P WKT 2010 06 29 00 44 55 31.3200 -97.3300 251.000 457.0 95.197 3.550 -999.990 -999.990 0.952 ..P WKT 2010 06 29 00 54 55 31.3200 -97.3300 251.000 30.0 91.120 3.670 -999.990 -999.990 0.911 ..P WKT 2010 06 29 00 59 55 31.3200 -97.3300 251.000 122.0 96.430 3.930 -999.990 -999.990 0.964 ..P WKT 2010 06 29 01 04 55 31.3200 -97.3300 251.000 457.0 94.142 3.270 -999.990 -999.990 0.941 ..P WKT 2010 06 29 01 09 55 31.3200 -97.3300 251.000 30.0 96.636 3.430 -999.990 -999.990 0.966 ..P WKT 2010 06 29 01 14 55 31.3200 -97.3300 251.000 122.0 103.068 3.190 -999.990 -999.990 1.031 ..P WKT 2010 06 29 01 19 55 31.3200 -97.3300 251.000 457.0 97.123 3.060 -999.990 -999.990 0.971 ..P WKT 2010 06 29 01 29 55 31.3200 -97.3300 251.000 30.0 102.671 2.880 -999.990 -999.990 1.027 ..P WKT 2010 06 29 01 34 55 31.3200 -97.3300 251.000 122.0 106.286 4.530 -999.990 -999.990 1.063 ..P WKT 2010 06 29 01 39 55 31.3200 -97.3300 251.000 457.0 109.057 2.660 -999.990 -999.990 1.091 ..P WKT 2010 06 29 01 44 55 31.3200 -97.3300 251.000 30.0 110.704 2.730 -999.990 -999.990 1.107 ..P WKT 2010 06 29 01 49 55 31.3200 -97.3300 251.000 122.0 112.069 3.230 -999.990 -999.990 1.121 ..P WKT 2010 06 29 01 54 55 31.3200 -97.3300 251.000 457.0 108.938 2.520 -999.990 -999.990 1.089 ..P WKT 2010 06 29 02 04 55 31.3200 -97.3300 251.000 30.0 119.088 2.830 -999.990 -999.990 1.191 ..P WKT 2010 06 29 02 09 55 31.3200 -97.3300 251.000 122.0 119.027 3.210 -999.990 -999.990 1.190 ..P WKT 2010 06 29 02 14 55 31.3200 -97.3300 251.000 457.0 102.825 3.070 -999.990 -999.990 1.028 ..P WKT 2010 06 29 02 19 55 31.3200 -97.3300 251.000 30.0 115.256 3.130 -999.990 -999.990 1.153 ..P WKT 2010 06 29 02 24 55 31.3200 -97.3300 251.000 122.0 122.912 3.380 -999.990 -999.990 1.229 ..P WKT 2010 06 29 02 29 55 31.3200 -97.3300 251.000 457.0 117.659 3.710 -999.990 -999.990 1.177 ..P WKT 2010 06 29 02 39 55 31.3200 -97.3300 251.000 30.0 123.547 4.070 -999.990 -999.990 1.235 ..P WKT 2010 06 29 02 44 55 31.3200 -97.3300 251.000 122.0 122.343 4.020 -999.990 -999.990 1.223 ..P WKT 2010 06 29 02 49 55 31.3200 -97.3300 251.000 457.0 114.972 3.670 -999.990 -999.990 1.150 ..P WKT 2010 06 29 02 54 55 31.3200 -97.3300 251.000 30.0 104.379 4.040 -999.990 -999.990 1.044 ..P WKT 2010 06 29 02 59 55 31.3200 -97.3300 251.000 122.0 109.064 3.850 -999.990 -999.990 1.091 ..P WKT 2010 06 29 03 04 55 31.3200 -97.3300 251.000 457.0 97.776 4.280 -999.990 -999.990 0.978 ..P WKT 2010 06 29 03 14 55 31.3200 -97.3300 251.000 30.0 96.059 4.260 -999.990 -999.990 0.961 ..P WKT 2010 06 29 03 19 55 31.3200 -97.3300 251.000 122.0 101.984 3.980 -999.990 -999.990 1.020 ..P WKT 2010 06 29 03 24 55 31.3200 -97.3300 251.000 457.0 104.406 4.560 -999.990 -999.990 1.044 ..P WKT 2010 06 29 03 29 55 31.3200 -97.3300 251.000 30.0 94.648 3.080 -999.990 -999.990 0.946 ..P WKT 2010 06 29 03 34 55 31.3200 -97.3300 251.000 122.0 121.985 3.160 -999.990 -999.990 1.220 ..P WKT 2010 06 29 03 39 55 31.3200 -97.3300 251.000 457.0 103.830 3.420 -999.990 -999.990 1.038 ..P WKT 2010 06 29 03 49 55 31.3200 -97.3300 251.000 30.0 99.696 3.460 -999.990 -999.990 0.997 ..P WKT 2010 06 29 03 54 55 31.3200 -97.3300 251.000 122.0 98.879 3.240 -999.990 -999.990 0.989 ..P WKT 2010 06 29 03 59 55 31.3200 -97.3300 251.000 457.0 104.635 4.040 -999.990 -999.990 1.046 ..P WKT 2010 06 29 04 04 55 31.3200 -97.3300 251.000 30.0 93.889 4.110 -999.990 -999.990 0.939 ..P WKT 2010 06 29 04 09 55 31.3200 -97.3300 251.000 122.0 97.967 3.610 -999.990 -999.990 0.980 ..P WKT 2010 06 29 04 14 55 31.3200 -97.3300 251.000 457.0 104.280 2.880 -999.990 -999.990 1.043 ..P WKT 2010 06 29 04 24 55 31.3200 -97.3300 251.000 30.0 93.822 3.230 -999.990 -999.990 0.938 ..P WKT 2010 06 29 04 29 55 31.3200 -97.3300 251.000 122.0 107.516 4.110 -999.990 -999.990 1.075 ..P WKT 2010 06 29 04 34 55 31.3200 -97.3300 251.000 457.0 107.238 3.910 -999.990 -999.990 1.072 ..P WKT 2010 06 29 04 39 55 31.3200 -97.3300 251.000 30.0 101.094 4.100 -999.990 -999.990 1.011 ..P WKT 2010 06 29 04 44 55 31.3200 -97.3300 251.000 122.0 109.474 4.110 -999.990 -999.990 1.095 ..P WKT 2010 06 29 04 49 55 31.3200 -97.3300 251.000 457.0 113.942 4.790 -999.990 -999.990 1.139 ..P WKT 2010 06 29 05 04 55 31.3200 -97.3300 251.000 30.0 100.953 3.680 -999.990 -999.990 1.010 ..P WKT 2010 06 29 05 09 55 31.3200 -97.3300 251.000 122.0 110.647 4.110 -999.990 -999.990 1.106 ..P WKT 2010 06 29 05 14 55 31.3200 -97.3300 251.000 457.0 106.946 4.460 -999.990 -999.990 1.069 ..P WKT 2010 06 29 05 19 55 31.3200 -97.3300 251.000 30.0 95.714 3.910 -999.990 -999.990 0.957 ..P WKT 2010 06 29 05 24 55 31.3200 -97.3300 251.000 122.0 107.356 3.270 -999.990 -999.990 1.074 ..P WKT 2010 06 29 05 29 55 31.3200 -97.3300 251.000 457.0 100.032 3.380 -999.990 -999.990 1.000 ..P WKT 2010 06 29 05 39 55 31.3200 -97.3300 251.000 30.0 100.240 3.730 -999.990 -999.990 1.002 ..P WKT 2010 06 29 05 44 55 31.3200 -97.3300 251.000 122.0 109.718 3.460 -999.990 -999.990 1.097 ..P WKT 2010 06 29 05 49 55 31.3200 -97.3300 251.000 457.0 97.736 3.490 -999.990 -999.990 0.977 ..P WKT 2010 06 29 05 54 55 31.3200 -97.3300 251.000 30.0 96.903 3.440 -999.990 -999.990 0.969 ..P WKT 2010 06 29 05 59 55 31.3200 -97.3300 251.000 122.0 111.112 3.270 -999.990 -999.990 1.111 ..P WKT 2010 06 29 06 04 55 31.3200 -97.3300 251.000 457.0 94.541 4.250 -999.990 -999.990 0.945 ..P WKT 2010 06 29 06 14 55 31.3200 -97.3300 251.000 30.0 96.774 3.480 -999.990 -999.990 0.968 ..P WKT 2010 06 29 06 19 55 31.3200 -97.3300 251.000 122.0 105.546 4.170 -999.990 -999.990 1.055 ..P WKT 2010 06 29 06 24 55 31.3200 -97.3300 251.000 457.0 95.110 3.800 -999.990 -999.990 0.951 ..P WKT 2010 06 29 06 29 55 31.3200 -97.3300 251.000 30.0 96.225 3.590 -999.990 -999.990 0.962 ..P WKT 2010 06 29 06 34 55 31.3200 -97.3300 251.000 122.0 107.914 4.090 -999.990 -999.990 1.079 ..P WKT 2010 06 29 06 39 55 31.3200 -97.3300 251.000 457.0 103.046 3.650 -999.990 -999.990 1.030 ..P WKT 2010 06 29 06 49 55 31.3200 -97.3300 251.000 30.0 104.300 5.430 -999.990 -999.990 1.043 ..P WKT 2010 06 29 06 54 55 31.3200 -97.3300 251.000 122.0 109.446 3.780 -999.990 -999.990 1.094 ..P WKT 2010 06 29 06 59 55 31.3200 -97.3300 251.000 457.0 107.778 3.980 -999.990 -999.990 1.078 ..P WKT 2010 06 29 07 04 55 31.3200 -97.3300 251.000 30.0 105.138 4.950 -999.990 -999.990 1.051 ..P WKT 2010 06 29 07 09 55 31.3200 -97.3300 251.000 122.0 111.393 4.550 -999.990 -999.990 1.114 ..P WKT 2010 06 29 07 14 55 31.3200 -97.3300 251.000 457.0 114.171 4.390 -999.990 -999.990 1.142 ..P WKT 2010 06 29 07 24 55 31.3200 -97.3300 251.000 30.0 106.334 4.290 -999.990 -999.990 1.063 ..P WKT 2010 06 29 07 29 55 31.3200 -97.3300 251.000 122.0 112.108 4.220 -999.990 -999.990 1.121 ..P WKT 2010 06 29 07 34 55 31.3200 -97.3300 251.000 457.0 115.102 3.980 -999.990 -999.990 1.151 ..P WKT 2010 06 29 07 39 55 31.3200 -97.3300 251.000 30.0 108.102 3.990 -999.990 -999.990 1.081 ..P WKT 2010 06 29 07 44 55 31.3200 -97.3300 251.000 122.0 113.179 4.720 -999.990 -999.990 1.132 ..P WKT 2010 06 29 07 49 55 31.3200 -97.3300 251.000 457.0 108.123 4.380 -999.990 -999.990 1.081 ..P WKT 2010 06 29 07 59 55 31.3200 -97.3300 251.000 30.0 108.383 5.010 -999.990 -999.990 1.084 ..P WKT 2010 06 29 08 04 55 31.3200 -97.3300 251.000 122.0 117.299 4.650 -999.990 -999.990 1.173 ..P WKT 2010 06 29 08 09 55 31.3200 -97.3300 251.000 457.0 119.279 3.730 -999.990 -999.990 1.193 ..P WKT 2010 06 29 08 14 55 31.3200 -97.3300 251.000 30.0 105.176 3.700 -999.990 -999.990 1.052 ..P WKT 2010 06 29 08 19 55 31.3200 -97.3300 251.000 122.0 110.207 3.900 -999.990 -999.990 1.102 ..P WKT 2010 06 29 08 24 55 31.3200 -97.3300 251.000 457.0 105.535 4.110 -999.990 -999.990 1.055 ..P WKT 2010 06 29 08 34 55 31.3200 -97.3300 251.000 30.0 107.754 4.030 -999.990 -999.990 1.078 ..P WKT 2010 06 29 08 39 55 31.3200 -97.3300 251.000 122.0 117.688 4.180 -999.990 -999.990 1.177 ..P WKT 2010 06 29 08 44 55 31.3200 -97.3300 251.000 457.0 111.555 4.280 -999.990 -999.990 1.116 ..P WKT 2010 06 29 08 49 55 31.3200 -97.3300 251.000 30.0 108.745 4.110 -999.990 -999.990 1.087 ..P WKT 2010 06 29 08 54 55 31.3200 -97.3300 251.000 122.0 118.398 4.430 -999.990 -999.990 1.184 ..P WKT 2010 06 29 08 59 55 31.3200 -97.3300 251.000 457.0 110.606 4.100 -999.990 -999.990 1.106 ..P WKT 2010 06 29 09 09 55 31.3200 -97.3300 251.000 30.0 104.280 4.090 -999.990 -999.990 1.043 ..P WKT 2010 06 29 09 14 55 31.3200 -97.3300 251.000 122.0 105.191 4.230 -999.990 -999.990 1.052 ..P WKT 2010 06 29 09 19 55 31.3200 -97.3300 251.000 457.0 104.164 4.890 -999.990 -999.990 1.042 ..P WKT 2010 06 29 09 24 55 31.3200 -97.3300 251.000 30.0 109.224 4.060 -999.990 -999.990 1.092 ..P WKT 2010 06 29 09 29 55 31.3200 -97.3300 251.000 122.0 117.323 4.210 -999.990 -999.990 1.173 ..P WKT 2010 06 29 09 34 55 31.3200 -97.3300 251.000 457.0 102.470 4.670 -999.990 -999.990 1.025 ..P WKT 2010 06 29 09 44 55 31.3200 -97.3300 251.000 30.0 104.862 4.220 -999.990 -999.990 1.049 ..P WKT 2010 06 29 09 49 55 31.3200 -97.3300 251.000 122.0 114.636 4.340 -999.990 -999.990 1.146 ..P WKT 2010 06 29 09 54 55 31.3200 -97.3300 251.000 457.0 90.970 4.350 -999.990 -999.990 0.910 ..P WKT 2010 06 29 09 59 55 31.3200 -97.3300 251.000 30.0 105.301 4.300 -999.990 -999.990 1.053 ..P WKT 2010 06 29 10 04 55 31.3200 -97.3300 251.000 122.0 114.102 5.020 -999.990 -999.990 1.141 ..P WKT 2010 06 29 10 09 55 31.3200 -97.3300 251.000 457.0 102.739 4.120 -999.990 -999.990 1.027 ..P WKT 2010 06 29 10 19 55 31.3200 -97.3300 251.000 30.0 103.117 3.900 -999.990 -999.990 1.031 ..P WKT 2010 06 29 10 24 55 31.3200 -97.3300 251.000 122.0 120.372 4.710 -999.990 -999.990 1.204 ..P WKT 2010 06 29 10 29 55 31.3200 -97.3300 251.000 457.0 111.539 4.780 -999.990 -999.990 1.115 ..P WKT 2010 06 29 10 34 55 31.3200 -97.3300 251.000 30.0 102.984 5.090 -999.990 -999.990 1.030 ..P WKT 2010 06 29 10 39 55 31.3200 -97.3300 251.000 122.0 124.920 4.860 -999.990 -999.990 1.249 ..P WKT 2010 06 29 10 44 55 31.3200 -97.3300 251.000 457.0 107.677 4.900 -999.990 -999.990 1.077 ..P WKT 2010 06 29 10 54 55 31.3200 -97.3300 251.000 30.0 111.460 4.630 -999.990 -999.990 1.115 ..P WKT 2010 06 29 10 59 55 31.3200 -97.3300 251.000 122.0 124.616 4.950 -999.990 -999.990 1.246 ..P WKT 2010 06 29 11 04 55 31.3200 -97.3300 251.000 457.0 111.166 5.230 -999.990 -999.990 1.112 ..P WKT 2010 06 29 11 09 55 31.3200 -97.3300 251.000 30.0 113.430 4.610 -999.990 -999.990 1.134 ..P WKT 2010 06 29 11 14 55 31.3200 -97.3300 251.000 122.0 120.102 4.790 -999.990 -999.990 1.201 ..P WKT 2010 06 29 11 19 55 31.3200 -97.3300 251.000 457.0 103.215 5.370 -999.990 -999.990 1.032 ..P WKT 2010 06 29 11 29 55 31.3200 -97.3300 251.000 30.0 118.679 5.580 -999.990 -999.990 1.187 ..P WKT 2010 06 29 11 34 55 31.3200 -97.3300 251.000 122.0 125.403 4.620 -999.990 -999.990 1.254 ..P WKT 2010 06 29 11 39 55 31.3200 -97.3300 251.000 457.0 101.425 4.900 -999.990 -999.990 1.014 ..P WKT 2010 06 29 11 44 55 31.3200 -97.3300 251.000 30.0 118.197 4.990 -999.990 -999.990 1.182 ..P WKT 2010 06 29 11 49 55 31.3200 -97.3300 251.000 122.0 120.789 5.160 -999.990 -999.990 1.208 ..P WKT 2010 06 29 12 09 55 31.3200 -97.3300 251.000 457.0 93.844 5.370 -999.990 -999.990 0.938 ..P WKT 2010 06 29 12 10 25 31.3200 -97.3300 251.000 457.0 105.672 5.440 -999.990 -999.990 1.057 ..P WKT 2010 06 29 12 10 55 31.3200 -97.3300 251.000 457.0 104.842 4.520 -999.990 -999.990 1.048 ..P WKT 2010 06 29 12 11 25 31.3200 -97.3300 251.000 457.0 104.287 4.800 -999.990 -999.990 1.043 ..P WKT 2010 06 29 12 11 55 31.3200 -97.3300 251.000 457.0 113.913 5.470 -999.990 -999.990 1.139 ..P WKT 2010 06 29 12 12 25 31.3200 -97.3300 251.000 457.0 104.552 5.710 -999.990 -999.990 1.046 ..P WKT 2010 06 29 12 12 55 31.3200 -97.3300 251.000 457.0 108.950 4.730 -999.990 -999.990 1.090 ..P WKT 2010 06 29 12 13 25 31.3200 -97.3300 251.000 457.0 106.194 4.500 -999.990 -999.990 1.062 ..P WKT 2010 06 29 12 13 55 31.3200 -97.3300 251.000 457.0 108.391 4.560 -999.990 -999.990 1.084 ..P WKT 2010 06 29 12 14 25 31.3200 -97.3300 251.000 457.0 106.459 4.540 -999.990 -999.990 1.065 ..P WKT 2010 06 29 12 14 55 31.3200 -97.3300 251.000 457.0 105.078 4.430 -999.990 -999.990 1.051 ..P WKT 2010 06 29 12 19 55 31.3200 -97.3300 251.000 30.0 116.315 4.400 -999.990 -999.990 1.163 ..P WKT 2010 06 29 12 24 55 31.3200 -97.3300 251.000 122.0 117.094 4.310 -999.990 -999.990 1.171 ..P WKT 2010 06 29 12 29 55 31.3200 -97.3300 251.000 457.0 105.483 4.240 -999.990 -999.990 1.055 ..P WKT 2010 06 29 12 34 55 31.3200 -97.3300 251.000 30.0 120.304 6.500 -999.990 -999.990 1.203 ..P WKT 2010 06 29 12 39 55 31.3200 -97.3300 251.000 122.0 120.257 4.020 -999.990 -999.990 1.203 ..P WKT 2010 06 29 12 44 55 31.3200 -97.3300 251.000 457.0 108.919 4.410 -999.990 -999.990 1.089 ..P WKT 2010 06 29 12 54 55 31.3200 -97.3300 251.000 30.0 121.784 4.230 -999.990 -999.990 1.218 ..P WKT 2010 06 29 12 59 55 31.3200 -97.3300 251.000 122.0 122.577 4.250 -999.990 -999.990 1.226 ..P WKT 2010 06 29 13 04 55 31.3200 -97.3300 251.000 457.0 101.600 3.790 -999.990 -999.990 1.016 ..P WKT 2010 06 29 13 09 55 31.3200 -97.3300 251.000 30.0 122.511 4.090 -999.990 -999.990 1.225 ..P WKT 2010 06 29 13 14 55 31.3200 -97.3300 251.000 122.0 124.131 4.340 -999.990 -999.990 1.241 ..P WKT 2010 06 29 13 19 55 31.3200 -97.3300 251.000 457.0 104.525 4.030 -999.990 -999.990 1.045 ..P WKT 2010 06 29 13 29 55 31.3200 -97.3300 251.000 30.0 128.464 4.810 -999.990 -999.990 1.285 ..P WKT 2010 06 29 13 34 55 31.3200 -97.3300 251.000 122.0 124.314 3.990 -999.990 -999.990 1.243 ..P WKT 2010 06 29 13 39 55 31.3200 -97.3300 251.000 457.0 113.544 3.860 -999.990 -999.990 1.135 ..P WKT 2010 06 29 13 44 55 31.3200 -97.3300 251.000 30.0 127.874 4.280 -999.990 -999.990 1.279 ..P WKT 2010 06 29 13 49 55 31.3200 -97.3300 251.000 122.0 121.516 3.900 -999.990 -999.990 1.215 ..P WKT 2010 06 29 13 54 55 31.3200 -97.3300 251.000 457.0 105.361 4.150 -999.990 -999.990 1.054 ..P WKT 2010 06 29 14 04 55 31.3200 -97.3300 251.000 30.0 132.120 5.190 -999.990 -999.990 1.321 ..P WKT 2010 06 29 14 09 55 31.3200 -97.3300 251.000 122.0 130.471 4.580 -999.990 -999.990 1.305 ..P WKT 2010 06 29 14 14 55 31.3200 -97.3300 251.000 457.0 114.467 4.300 -999.990 -999.990 1.145 ..P WKT 2010 06 29 14 19 55 31.3200 -97.3300 251.000 30.0 128.276 5.170 -999.990 -999.990 1.283 ..P WKT 2010 06 29 14 24 55 31.3200 -97.3300 251.000 122.0 133.530 4.340 -999.990 -999.990 1.335 ..P WKT 2010 06 29 14 29 55 31.3200 -97.3300 251.000 457.0 114.344 3.790 -999.990 -999.990 1.143 ..P WKT 2010 06 29 14 39 55 31.3200 -97.3300 251.000 30.0 136.276 3.690 -999.990 -999.990 1.363 ..P WKT 2010 06 29 14 44 55 31.3200 -97.3300 251.000 122.0 141.217 5.250 -999.990 -999.990 1.412 ..P WKT 2010 06 29 14 49 55 31.3200 -97.3300 251.000 457.0 115.351 4.050 -999.990 -999.990 1.154 ..P WKT 2010 06 29 14 54 55 31.3200 -97.3300 251.000 30.0 128.029 4.530 -999.990 -999.990 1.280 ..P WKT 2010 06 29 14 59 55 31.3200 -97.3300 251.000 122.0 129.793 3.850 -999.990 -999.990 1.298 ..P WKT 2010 06 29 15 04 55 31.3200 -97.3300 251.000 457.0 109.721 4.260 -999.990 -999.990 1.097 ..P WKT 2010 06 29 15 14 55 31.3200 -97.3300 251.000 30.0 124.384 3.810 -999.990 -999.990 1.244 ..P WKT 2010 06 29 15 19 55 31.3200 -97.3300 251.000 122.0 128.854 3.750 -999.990 -999.990 1.289 ..P WKT 2010 06 29 15 24 55 31.3200 -97.3300 251.000 457.0 88.248 3.860 -999.990 -999.990 0.882 ..P WKT 2010 06 29 15 29 55 31.3200 -97.3300 251.000 30.0 128.809 4.420 -999.990 -999.990 1.288 ..P WKT 2010 06 29 15 34 55 31.3200 -97.3300 251.000 122.0 131.621 3.540 -999.990 -999.990 1.316 ..P WKT 2010 06 29 15 39 55 31.3200 -97.3300 251.000 457.0 89.340 3.620 -999.990 -999.990 0.893 ..P WKT 2010 06 29 15 49 55 31.3200 -97.3300 251.000 30.0 135.123 3.980 -999.990 -999.990 1.351 ..P WKT 2010 06 29 15 54 55 31.3200 -97.3300 251.000 122.0 138.807 4.490 -999.990 -999.990 1.388 ..P WKT 2010 06 29 15 59 55 31.3200 -97.3300 251.000 457.0 86.857 3.660 -999.990 -999.990 0.869 ..P WKT 2010 06 29 16 04 55 31.3200 -97.3300 251.000 30.0 130.677 3.730 -999.990 -999.990 1.307 ..P WKT 2010 06 29 16 09 55 31.3200 -97.3300 251.000 122.0 130.763 4.730 -999.990 -999.990 1.308 ..P WKT 2010 06 29 16 14 55 31.3200 -97.3300 251.000 457.0 111.467 3.510 -999.990 -999.990 1.115 ..P WKT 2010 06 29 16 24 55 31.3200 -97.3300 251.000 30.0 145.148 3.500 -999.990 -999.990 1.451 ..P WKT 2010 06 29 16 29 55 31.3200 -97.3300 251.000 122.0 154.932 3.750 -999.990 -999.990 1.549 ..P WKT 2010 06 29 16 34 55 31.3200 -97.3300 251.000 457.0 141.723 3.930 -999.990 -999.990 1.417 ..P WKT 2010 06 29 16 39 55 31.3200 -97.3300 251.000 30.0 144.304 3.900 -999.990 -999.990 1.443 ..P WKT 2010 06 29 16 44 55 31.3200 -97.3300 251.000 122.0 151.320 3.510 -999.990 -999.990 1.513 ..P WKT 2010 06 29 16 49 55 31.3200 -97.3300 251.000 457.0 132.564 3.550 -999.990 -999.990 1.326 ..P WKT 2010 06 29 17 04 55 31.3200 -97.3300 251.000 30.0 146.885 3.860 -999.990 -999.990 1.469 ..P WKT 2010 06 29 17 09 55 31.3200 -97.3300 251.000 122.0 147.349 4.020 -999.990 -999.990 1.473 ..P WKT 2010 06 29 17 14 55 31.3200 -97.3300 251.000 457.0 129.789 3.680 -999.990 -999.990 1.298 ..P WKT 2010 06 29 17 19 55 31.3200 -97.3300 251.000 30.0 137.463 4.900 -999.990 -999.990 1.375 ..P WKT 2010 06 29 17 24 55 31.3200 -97.3300 251.000 122.0 133.211 3.120 -999.990 -999.990 1.332 ..P WKT 2010 06 29 17 29 55 31.3200 -97.3300 251.000 457.0 118.695 3.550 -999.990 -999.990 1.187 ..P WKT 2010 06 29 17 39 55 31.3200 -97.3300 251.000 30.0 120.669 3.310 -999.990 -999.990 1.207 ..P WKT 2010 06 29 17 44 55 31.3200 -97.3300 251.000 122.0 126.621 3.260 -999.990 -999.990 1.266 ..P WKT 2010 06 29 17 49 55 31.3200 -97.3300 251.000 457.0 112.731 3.630 -999.990 -999.990 1.127 ..P WKT 2010 06 29 17 54 55 31.3200 -97.3300 251.000 30.0 119.795 4.080 -999.990 -999.990 1.198 ..P WKT 2010 06 29 17 59 55 31.3200 -97.3300 251.000 122.0 121.308 3.620 -999.990 -999.990 1.213 ..P WKT 2010 06 29 18 04 55 31.3200 -97.3300 251.000 457.0 112.132 3.130 -999.990 -999.990 1.121 ..P WKT 2010 06 29 18 14 55 31.3200 -97.3300 251.000 30.0 118.093 3.850 -999.990 -999.990 1.181 ..P WKT 2010 06 29 18 19 55 31.3200 -97.3300 251.000 122.0 115.182 3.520 -999.990 -999.990 1.152 ..P WKT 2010 06 29 18 24 55 31.3200 -97.3300 251.000 457.0 120.604 3.820 -999.990 -999.990 1.206 ..P WKT 2010 06 29 18 29 55 31.3200 -97.3300 251.000 30.0 99.774 3.780 -999.990 -999.990 0.998 ..P WKT 2010 06 29 18 34 55 31.3200 -97.3300 251.000 122.0 94.082 3.850 -999.990 -999.990 0.941 ..P WKT 2010 06 29 18 39 55 31.3200 -97.3300 251.000 457.0 99.225 4.460 -999.990 -999.990 0.992 ..P WKT 2010 06 29 18 49 55 31.3200 -97.3300 251.000 30.0 89.245 4.580 -999.990 -999.990 0.892 ..P WKT 2010 06 29 18 54 55 31.3200 -97.3300 251.000 122.0 84.403 3.790 -999.990 -999.990 0.844 ..P WKT 2010 06 29 18 59 55 31.3200 -97.3300 251.000 457.0 80.671 3.180 -999.990 -999.990 0.807 ..P WKT 2010 06 29 19 04 55 31.3200 -97.3300 251.000 30.0 91.814 4.190 -999.990 -999.990 0.918 ..P WKT 2010 06 29 19 09 55 31.3200 -97.3300 251.000 122.0 92.254 3.380 -999.990 -999.990 0.923 ..P WKT 2010 06 29 19 14 55 31.3200 -97.3300 251.000 457.0 81.012 2.980 -999.990 -999.990 0.810 ..P WKT 2010 06 29 19 24 55 31.3200 -97.3300 251.000 30.0 90.116 2.620 -999.990 -999.990 0.901 ..P WKT 2010 06 29 19 29 55 31.3200 -97.3300 251.000 122.0 103.653 4.130 -999.990 -999.990 1.037 ..P WKT 2010 06 29 19 34 55 31.3200 -97.3300 251.000 457.0 101.331 3.850 -999.990 -999.990 1.013 ..P WKT 2010 06 29 19 39 55 31.3200 -97.3300 251.000 30.0 102.627 3.340 -999.990 -999.990 1.026 ..P WKT 2010 06 29 19 44 55 31.3200 -97.3300 251.000 122.0 115.335 2.800 -999.990 -999.990 1.153 ..P WKT 2010 06 29 19 49 55 31.3200 -97.3300 251.000 457.0 92.276 1.990 -999.990 -999.990 0.923 ..P WKT 2010 06 29 19 59 55 31.3200 -97.3300 251.000 30.0 110.976 3.620 -999.990 -999.990 1.110 ..P WKT 2010 06 29 20 04 55 31.3200 -97.3300 251.000 122.0 119.892 2.840 -999.990 -999.990 1.199 ..P WKT 2010 06 29 20 09 55 31.3200 -97.3300 251.000 457.0 93.719 3.200 -999.990 -999.990 0.937 ..P WKT 2010 06 29 20 14 55 31.3200 -97.3300 251.000 30.0 112.663 3.050 -999.990 -999.990 1.127 ..P WKT 2010 06 29 20 19 55 31.3200 -97.3300 251.000 122.0 118.518 3.890 -999.990 -999.990 1.185 ..P WKT 2010 06 29 20 24 55 31.3200 -97.3300 251.000 457.0 103.758 3.410 -999.990 -999.990 1.038 ..P WKT 2010 06 29 20 34 55 31.3200 -97.3300 251.000 30.0 107.270 3.360 -999.990 -999.990 1.073 ..P WKT 2010 06 29 20 39 55 31.3200 -97.3300 251.000 122.0 104.089 2.940 -999.990 -999.990 1.041 ..P WKT 2010 06 29 20 44 55 31.3200 -97.3300 251.000 457.0 107.040 3.780 -999.990 -999.990 1.070 ..P WKT 2010 06 29 20 49 55 31.3200 -97.3300 251.000 30.0 102.186 3.190 -999.990 -999.990 1.022 ..P WKT 2010 06 29 20 54 55 31.3200 -97.3300 251.000 122.0 105.137 3.410 -999.990 -999.990 1.051 ..P WKT 2010 06 29 20 59 55 31.3200 -97.3300 251.000 457.0 100.003 3.190 -999.990 -999.990 1.000 ..P WKT 2010 06 29 21 09 55 31.3200 -97.3300 251.000 30.0 95.110 3.440 -999.990 -999.990 0.951 ..P WKT 2010 06 29 21 14 55 31.3200 -97.3300 251.000 122.0 104.278 3.390 -999.990 -999.990 1.043 ..P WKT 2010 06 29 21 19 55 31.3200 -97.3300 251.000 457.0 82.482 3.440 -999.990 -999.990 0.825 ..P WKT 2010 06 29 21 24 55 31.3200 -97.3300 251.000 30.0 103.370 3.310 -999.990 -999.990 1.034 ..P WKT 2010 06 29 21 29 55 31.3200 -97.3300 251.000 122.0 103.613 3.420 -999.990 -999.990 1.036 ..P WKT 2010 06 29 21 34 55 31.3200 -97.3300 251.000 457.0 83.205 3.820 -999.990 -999.990 0.832 ..P WKT 2010 06 29 21 44 55 31.3200 -97.3300 251.000 30.0 102.928 3.600 -999.990 -999.990 1.029 ..P WKT 2010 06 29 21 49 55 31.3200 -97.3300 251.000 122.0 104.129 3.670 -999.990 -999.990 1.041 ..P WKT 2010 06 29 21 54 55 31.3200 -97.3300 251.000 457.0 83.971 3.430 -999.990 -999.990 0.840 ..P WKT 2010 06 29 21 59 55 31.3200 -97.3300 251.000 30.0 104.437 2.540 -999.990 -999.990 1.044 ..P WKT 2010 06 29 22 04 55 31.3200 -97.3300 251.000 122.0 111.363 2.240 -999.990 -999.990 1.114 ..P WKT 2010 06 29 22 09 55 31.3200 -97.3300 251.000 457.0 95.807 2.300 -999.990 -999.990 0.958 ..P WKT 2010 06 29 22 19 55 31.3200 -97.3300 251.000 30.0 112.516 3.010 -999.990 -999.990 1.125 ..P WKT 2010 06 29 22 24 55 31.3200 -97.3300 251.000 122.0 117.551 3.420 -999.990 -999.990 1.176 ..P WKT 2010 06 29 22 29 55 31.3200 -97.3300 251.000 457.0 109.872 2.590 -999.990 -999.990 1.099 ..P WKT 2010 06 29 22 34 55 31.3200 -97.3300 251.000 30.0 110.855 3.510 -999.990 -999.990 1.109 ..P WKT 2010 06 29 22 39 55 31.3200 -97.3300 251.000 122.0 117.569 3.410 -999.990 -999.990 1.176 ..P WKT 2010 06 29 22 44 55 31.3200 -97.3300 251.000 457.0 106.533 2.820 -999.990 -999.990 1.065 ..P WKT 2010 06 29 22 54 55 31.3200 -97.3300 251.000 30.0 114.391 2.590 -999.990 -999.990 1.144 ..P WKT 2010 06 29 22 59 55 31.3200 -97.3300 251.000 122.0 116.514 3.540 -999.990 -999.990 1.165 ..P WKT 2010 06 29 23 04 55 31.3200 -97.3300 251.000 457.0 115.701 3.800 -999.990 -999.990 1.157 ..P WKT 2010 06 29 23 09 55 31.3200 -97.3300 251.000 30.0 115.027 2.890 -999.990 -999.990 1.150 ..P WKT 2010 06 29 23 14 55 31.3200 -97.3300 251.000 122.0 123.445 4.210 -999.990 -999.990 1.234 ..P WKT 2010 06 29 23 19 55 31.3200 -97.3300 251.000 457.0 118.996 3.150 -999.990 -999.990 1.190 ..P WKT 2010 06 29 23 29 55 31.3200 -97.3300 251.000 30.0 119.330 4.790 -999.990 -999.990 1.193 ..P WKT 2010 06 29 23 34 55 31.3200 -97.3300 251.000 122.0 127.755 2.750 -999.990 -999.990 1.278 ..P WKT 2010 06 29 23 39 55 31.3200 -97.3300 251.000 457.0 115.050 5.180 -999.990 -999.990 1.151 ..P WKT 2010 06 29 23 44 55 31.3200 -97.3300 251.000 30.0 121.376 3.690 -999.990 -999.990 1.214 ..P WKT 2010 06 29 23 49 55 31.3200 -97.3300 251.000 122.0 123.365 5.310 -999.990 -999.990 1.234 ..P WKT 2010 06 30 00 09 55 31.3200 -97.3300 251.000 457.0 87.470 1.510 -999.990 -999.990 0.875 ..P WKT 2010 06 30 00 10 25 31.3200 -97.3300 251.000 457.0 84.423 3.350 -999.990 -999.990 0.844 ..P WKT 2010 06 30 00 10 55 31.3200 -97.3300 251.000 457.0 85.579 3.200 -999.990 -999.990 0.856 ..P WKT 2010 06 30 00 11 25 31.3200 -97.3300 251.000 457.0 80.012 4.350 -999.990 -999.990 0.800 ..P WKT 2010 06 30 00 11 55 31.3200 -97.3300 251.000 457.0 75.005 3.530 -999.990 -999.990 0.750 ..P WKT 2010 06 30 00 12 25 31.3200 -97.3300 251.000 457.0 81.763 1.850 -999.990 -999.990 0.818 ..P WKT 2010 06 30 00 12 55 31.3200 -97.3300 251.000 457.0 80.117 2.550 -999.990 -999.990 0.801 ..P WKT 2010 06 30 00 13 25 31.3200 -97.3300 251.000 457.0 87.995 2.690 -999.990 -999.990 0.880 ..P WKT 2010 06 30 00 13 55 31.3200 -97.3300 251.000 457.0 84.389 3.700 -999.990 -999.990 0.844 ..P WKT 2010 06 30 00 14 25 31.3200 -97.3300 251.000 457.0 81.903 2.720 -999.990 -999.990 0.819 ..P WKT 2010 06 30 00 14 55 31.3200 -97.3300 251.000 457.0 78.856 4.050 -999.990 -999.990 0.789 ..P WKT 2010 06 30 00 19 55 31.3200 -97.3300 251.000 30.0 108.901 3.930 -999.990 -999.990 1.089 ..P WKT 2010 06 30 00 24 55 31.3200 -97.3300 251.000 122.0 115.698 3.070 -999.990 -999.990 1.157 ..P WKT 2010 06 30 00 29 55 31.3200 -97.3300 251.000 457.0 94.195 2.820 -999.990 -999.990 0.942 ..P WKT 2010 06 30 00 34 55 31.3200 -97.3300 251.000 30.0 106.036 1.980 -999.990 -999.990 1.060 ..P WKT 2010 06 30 00 39 55 31.3200 -97.3300 251.000 122.0 105.827 3.920 -999.990 -999.990 1.058 ..P WKT 2010 06 30 00 44 55 31.3200 -97.3300 251.000 457.0 93.567 2.500 -999.990 -999.990 0.936 ..P WKT 2010 06 30 00 54 55 31.3200 -97.3300 251.000 30.0 98.292 1.690 -999.990 -999.990 0.983 ..P WKT 2010 06 30 00 59 55 31.3200 -97.3300 251.000 122.0 97.621 2.120 -999.990 -999.990 0.976 ..P WKT 2010 06 30 01 04 55 31.3200 -97.3300 251.000 457.0 98.631 2.180 -999.990 -999.990 0.986 ..P WKT 2010 06 30 01 09 55 31.3200 -97.3300 251.000 30.0 100.203 1.830 -999.990 -999.990 1.002 ..P WKT 2010 06 30 01 14 55 31.3200 -97.3300 251.000 122.0 105.139 3.220 -999.990 -999.990 1.051 ..P WKT 2010 06 30 01 19 55 31.3200 -97.3300 251.000 457.0 107.553 2.860 -999.990 -999.990 1.076 ..P WKT 2010 06 30 01 29 55 31.3200 -97.3300 251.000 30.0 102.564 2.800 -999.990 -999.990 1.026 ..P WKT 2010 06 30 01 34 55 31.3200 -97.3300 251.000 122.0 105.539 3.140 -999.990 -999.990 1.055 ..P WKT 2010 06 30 01 39 55 31.3200 -97.3300 251.000 457.0 94.206 3.410 -999.990 -999.990 0.942 ..P WKT 2010 06 30 01 44 55 31.3200 -97.3300 251.000 30.0 103.775 4.460 -999.990 -999.990 1.038 ..P WKT 2010 06 30 01 49 55 31.3200 -97.3300 251.000 122.0 104.366 3.530 -999.990 -999.990 1.044 ..P WKT 2010 06 30 01 54 55 31.3200 -97.3300 251.000 457.0 98.222 2.840 -999.990 -999.990 0.982 ..P WKT 2010 06 30 02 04 55 31.3200 -97.3300 251.000 30.0 102.310 3.840 -999.990 -999.990 1.023 ..P WKT 2010 06 30 02 09 55 31.3200 -97.3300 251.000 122.0 100.334 3.550 -999.990 -999.990 1.003 ..P WKT 2010 06 30 02 14 55 31.3200 -97.3300 251.000 457.0 84.041 3.880 -999.990 -999.990 0.840 ..P WKT 2010 06 30 02 19 55 31.3200 -97.3300 251.000 30.0 93.013 3.810 -999.990 -999.990 0.930 ..P WKT 2010 06 30 02 24 55 31.3200 -97.3300 251.000 122.0 93.844 3.280 -999.990 -999.990 0.938 ..P WKT 2010 06 30 02 29 55 31.3200 -97.3300 251.000 457.0 84.567 3.790 -999.990 -999.990 0.846 ..P WKT 2010 06 30 02 39 55 31.3200 -97.3300 251.000 30.0 93.088 4.880 -999.990 -999.990 0.931 ..P WKT 2010 06 30 02 44 55 31.3200 -97.3300 251.000 122.0 101.483 3.580 -999.990 -999.990 1.015 ..P WKT 2010 06 30 02 49 55 31.3200 -97.3300 251.000 457.0 82.913 4.280 -999.990 -999.990 0.829 ..P WKT 2010 06 30 02 54 55 31.3200 -97.3300 251.000 30.0 91.168 3.930 -999.990 -999.990 0.912 ..P WKT 2010 06 30 02 59 55 31.3200 -97.3300 251.000 122.0 99.705 3.470 -999.990 -999.990 0.997 ..P WKT 2010 06 30 03 04 55 31.3200 -97.3300 251.000 457.0 83.238 3.460 -999.990 -999.990 0.832 ..P WKT 2010 06 30 03 14 55 31.3200 -97.3300 251.000 30.0 101.117 3.430 -999.990 -999.990 1.011 ..P WKT 2010 06 30 03 19 55 31.3200 -97.3300 251.000 122.0 108.213 2.940 -999.990 -999.990 1.082 ..P WKT 2010 06 30 03 24 55 31.3200 -97.3300 251.000 457.0 111.937 4.980 -999.990 -999.990 1.119 ..P WKT 2010 06 30 03 29 55 31.3200 -97.3300 251.000 30.0 107.650 4.550 -999.990 -999.990 1.077 ..P WKT 2010 06 30 03 34 55 31.3200 -97.3300 251.000 122.0 109.829 4.190 -999.990 -999.990 1.098 ..P WKT 2010 06 30 03 39 55 31.3200 -97.3300 251.000 457.0 121.285 2.720 -999.990 -999.990 1.213 ..P WKT 2010 06 30 03 49 55 31.3200 -97.3300 251.000 30.0 112.711 2.570 -999.990 -999.990 1.127 ..P WKT 2010 06 30 03 54 55 31.3200 -97.3300 251.000 122.0 114.891 3.890 -999.990 -999.990 1.149 ..P WKT 2010 06 30 03 59 55 31.3200 -97.3300 251.000 457.0 118.478 5.000 -999.990 -999.990 1.185 ..P WKT 2010 06 30 04 04 55 31.3200 -97.3300 251.000 30.0 109.689 4.290 -999.990 -999.990 1.097 ..P WKT 2010 06 30 04 09 55 31.3200 -97.3300 251.000 122.0 113.275 4.090 -999.990 -999.990 1.133 ..P WKT 2010 06 30 04 14 55 31.3200 -97.3300 251.000 457.0 118.550 6.320 -999.990 -999.990 1.185 ..P WKT 2010 06 30 04 24 55 31.3200 -97.3300 251.000 30.0 113.347 2.370 -999.990 -999.990 1.133 ..P WKT 2010 06 30 04 29 55 31.3200 -97.3300 251.000 122.0 111.870 3.500 -999.990 -999.990 1.119 ..P WKT 2010 06 30 04 34 55 31.3200 -97.3300 251.000 457.0 117.146 4.450 -999.990 -999.990 1.171 ..P WKT 2010 06 30 04 39 55 31.3200 -97.3300 251.000 30.0 116.795 4.300 -999.990 -999.990 1.168 ..P WKT 2010 06 30 04 44 55 31.3200 -97.3300 251.000 122.0 117.007 3.500 -999.990 -999.990 1.170 ..P WKT 2010 06 30 04 49 55 31.3200 -97.3300 251.000 457.0 110.745 3.510 -999.990 -999.990 1.107 ..P WKT 2010 06 30 05 04 55 31.3200 -97.3300 251.000 30.0 105.767 2.980 -999.990 -999.990 1.058 ..P WKT 2010 06 30 05 09 55 31.3200 -97.3300 251.000 122.0 103.877 4.360 -999.990 -999.990 1.039 ..P WKT 2010 06 30 05 14 55 31.3200 -97.3300 251.000 457.0 100.859 4.150 -999.990 -999.990 1.009 ..P WKT 2010 06 30 05 19 55 31.3200 -97.3300 251.000 30.0 99.249 2.630 -999.990 -999.990 0.992 ..P WKT 2010 06 30 05 24 55 31.3200 -97.3300 251.000 122.0 103.836 2.740 -999.990 -999.990 1.038 ..P WKT 2010 06 30 05 29 55 31.3200 -97.3300 251.000 457.0 118.844 2.250 -999.990 -999.990 1.188 ..P WKT 2010 06 30 05 39 55 31.3200 -97.3300 251.000 30.0 101.007 2.670 -999.990 -999.990 1.010 ..P WKT 2010 06 30 05 44 55 31.3200 -97.3300 251.000 122.0 103.934 2.740 -999.990 -999.990 1.039 ..P WKT 2010 06 30 05 49 55 31.3200 -97.3300 251.000 457.0 105.312 2.650 -999.990 -999.990 1.053 ..P WKT 2010 06 30 05 54 55 31.3200 -97.3300 251.000 30.0 101.901 3.100 -999.990 -999.990 1.019 ..P WKT 2010 06 30 05 59 55 31.3200 -97.3300 251.000 122.0 108.211 3.370 -999.990 -999.990 1.082 ..P WKT 2010 06 30 06 04 55 31.3200 -97.3300 251.000 457.0 104.939 3.050 -999.990 -999.990 1.049 ..P WKT 2010 06 30 06 14 55 31.3200 -97.3300 251.000 30.0 106.911 3.410 -999.990 -999.990 1.069 ..P WKT 2010 06 30 06 19 55 31.3200 -97.3300 251.000 122.0 112.581 4.430 -999.990 -999.990 1.126 ..P WKT 2010 06 30 06 24 55 31.3200 -97.3300 251.000 457.0 104.293 2.580 -999.990 -999.990 1.043 ..P WKT 2010 06 30 06 29 55 31.3200 -97.3300 251.000 30.0 114.192 2.850 -999.990 -999.990 1.142 ..P WKT 2010 06 30 06 34 55 31.3200 -97.3300 251.000 122.0 114.505 2.480 -999.990 -999.990 1.145 ..P WKT 2010 06 30 06 39 55 31.3200 -97.3300 251.000 457.0 108.613 2.910 -999.990 -999.990 1.086 ..P WKT 2010 06 30 06 49 55 31.3200 -97.3300 251.000 30.0 111.595 2.160 -999.990 -999.990 1.116 ..P WKT 2010 06 30 06 54 55 31.3200 -97.3300 251.000 122.0 121.036 2.110 -999.990 -999.990 1.210 ..P WKT 2010 06 30 06 59 55 31.3200 -97.3300 251.000 457.0 106.638 3.140 -999.990 -999.990 1.066 ..P WKT 2010 06 30 07 04 55 31.3200 -97.3300 251.000 30.0 115.093 2.700 -999.990 -999.990 1.151 ..P WKT 2010 06 30 07 09 55 31.3200 -97.3300 251.000 122.0 112.543 1.900 -999.990 -999.990 1.125 ..P WKT 2010 06 30 07 14 55 31.3200 -97.3300 251.000 457.0 93.344 2.570 -999.990 -999.990 0.933 ..P WKT 2010 06 30 07 24 55 31.3200 -97.3300 251.000 30.0 114.026 3.690 -999.990 -999.990 1.140 ..P WKT 2010 06 30 07 29 55 31.3200 -97.3300 251.000 122.0 114.400 3.160 -999.990 -999.990 1.144 ..P WKT 2010 06 30 07 34 55 31.3200 -97.3300 251.000 457.0 101.364 1.980 -999.990 -999.990 1.014 ..P WKT 2010 06 30 07 39 55 31.3200 -97.3300 251.000 30.0 120.934 2.350 -999.990 -999.990 1.209 ..P WKT 2010 06 30 07 44 55 31.3200 -97.3300 251.000 122.0 119.050 2.060 -999.990 -999.990 1.190 ..P WKT 2010 06 30 07 49 55 31.3200 -97.3300 251.000 457.0 100.787 2.020 -999.990 -999.990 1.008 ..P WKT 2010 06 30 07 59 55 31.3200 -97.3300 251.000 30.0 113.999 4.000 -999.990 -999.990 1.140 ..P WKT 2010 06 30 08 04 55 31.3200 -97.3300 251.000 122.0 116.956 3.330 -999.990 -999.990 1.170 ..P WKT 2010 06 30 08 09 55 31.3200 -97.3300 251.000 457.0 103.810 3.160 -999.990 -999.990 1.038 ..P WKT 2010 06 30 08 14 55 31.3200 -97.3300 251.000 30.0 109.874 2.230 -999.990 -999.990 1.099 ..P WKT 2010 06 30 08 19 55 31.3200 -97.3300 251.000 122.0 112.548 3.810 -999.990 -999.990 1.125 ..P WKT 2010 06 30 08 24 55 31.3200 -97.3300 251.000 457.0 107.311 2.530 -999.990 -999.990 1.073 ..P WKT 2010 06 30 08 34 55 31.3200 -97.3300 251.000 30.0 112.782 2.570 -999.990 -999.990 1.128 ..P WKT 2010 06 30 08 39 55 31.3200 -97.3300 251.000 122.0 122.926 2.180 -999.990 -999.990 1.229 ..P WKT 2010 06 30 08 44 55 31.3200 -97.3300 251.000 457.0 113.852 3.740 -999.990 -999.990 1.139 ..P WKT 2010 06 30 08 49 55 31.3200 -97.3300 251.000 30.0 117.780 3.980 -999.990 -999.990 1.178 ..P WKT 2010 06 30 08 54 55 31.3200 -97.3300 251.000 122.0 122.274 3.150 -999.990 -999.990 1.223 ..P WKT 2010 06 30 08 59 55 31.3200 -97.3300 251.000 457.0 113.480 3.990 -999.990 -999.990 1.135 ..P WKT 2010 06 30 09 09 55 31.3200 -97.3300 251.000 30.0 123.338 5.170 -999.990 -999.990 1.233 ..P WKT 2010 06 30 09 14 55 31.3200 -97.3300 251.000 122.0 123.046 3.530 -999.990 -999.990 1.230 ..P WKT 2010 06 30 09 19 55 31.3200 -97.3300 251.000 457.0 113.704 4.010 -999.990 -999.990 1.137 ..P WKT 2010 06 30 09 24 55 31.3200 -97.3300 251.000 30.0 115.957 2.790 -999.990 -999.990 1.160 ..P WKT 2010 06 30 09 29 55 31.3200 -97.3300 251.000 122.0 115.665 2.970 -999.990 -999.990 1.157 ..P WKT 2010 06 30 09 34 55 31.3200 -97.3300 251.000 457.0 110.563 2.800 -999.990 -999.990 1.106 ..P WKT 2010 06 30 09 44 55 31.3200 -97.3300 251.000 30.0 111.190 3.790 -999.990 -999.990 1.112 ..P WKT 2010 06 30 09 49 55 31.3200 -97.3300 251.000 122.0 108.856 3.260 -999.990 -999.990 1.089 ..P WKT 2010 06 30 09 54 55 31.3200 -97.3300 251.000 457.0 110.342 3.020 -999.990 -999.990 1.103 ..P WKT 2010 06 30 09 59 55 31.3200 -97.3300 251.000 30.0 110.271 3.720 -999.990 -999.990 1.103 ..P WKT 2010 06 30 10 04 55 31.3200 -97.3300 251.000 122.0 108.785 3.550 -999.990 -999.990 1.088 ..P WKT 2010 06 30 10 09 55 31.3200 -97.3300 251.000 457.0 87.625 4.260 -999.990 -999.990 0.876 ..P WKT 2010 06 30 10 19 55 31.3200 -97.3300 251.000 30.0 110.615 4.110 -999.990 -999.990 1.106 ..P WKT 2010 06 30 10 24 55 31.3200 -97.3300 251.000 122.0 112.304 3.260 -999.990 -999.990 1.123 ..P WKT 2010 06 30 10 29 55 31.3200 -97.3300 251.000 457.0 92.471 4.060 -999.990 -999.990 0.925 ..P WKT 2010 06 30 10 34 55 31.3200 -97.3300 251.000 30.0 112.709 4.780 -999.990 -999.990 1.127 ..P WKT 2010 06 30 10 39 55 31.3200 -97.3300 251.000 122.0 115.673 2.790 -999.990 -999.990 1.157 ..P WKT 2010 06 30 10 44 55 31.3200 -97.3300 251.000 457.0 94.845 2.530 -999.990 -999.990 0.948 ..P WKT 2010 06 30 10 54 55 31.3200 -97.3300 251.000 30.0 116.414 2.950 -999.990 -999.990 1.164 ..P WKT 2010 06 30 10 59 55 31.3200 -97.3300 251.000 122.0 112.923 3.860 -999.990 -999.990 1.129 ..P WKT 2010 06 30 11 04 55 31.3200 -97.3300 251.000 457.0 94.556 2.330 -999.990 -999.990 0.946 ..P WKT 2010 06 30 11 09 55 31.3200 -97.3300 251.000 30.0 111.892 2.760 -999.990 -999.990 1.119 ..P WKT 2010 06 30 11 14 55 31.3200 -97.3300 251.000 122.0 115.910 3.490 -999.990 -999.990 1.159 ..P WKT 2010 06 30 11 19 55 31.3200 -97.3300 251.000 457.0 100.940 3.150 -999.990 -999.990 1.009 ..P WKT 2010 06 30 11 29 55 31.3200 -97.3300 251.000 30.0 111.772 2.620 -999.990 -999.990 1.118 ..P WKT 2010 06 30 11 34 55 31.3200 -97.3300 251.000 122.0 117.168 2.940 -999.990 -999.990 1.172 ..P WKT 2010 06 30 11 39 55 31.3200 -97.3300 251.000 457.0 84.998 2.780 -999.990 -999.990 0.850 ..P WKT 2010 06 30 11 44 55 31.3200 -97.3300 251.000 30.0 113.220 3.670 -999.990 -999.990 1.132 ..P WKT 2010 06 30 11 49 55 31.3200 -97.3300 251.000 122.0 111.387 4.050 -999.990 -999.990 1.114 ..P WKT 2010 06 30 12 09 55 31.3200 -97.3300 251.000 457.0 81.044 3.140 -999.990 -999.990 0.810 ..P WKT 2010 06 30 12 10 25 31.3200 -97.3300 251.000 457.0 85.941 2.690 -999.990 -999.990 0.859 ..P WKT 2010 06 30 12 10 55 31.3200 -97.3300 251.000 457.0 80.345 2.900 -999.990 -999.990 0.803 ..P WKT 2010 06 30 12 11 25 31.3200 -97.3300 251.000 457.0 83.824 3.150 -999.990 -999.990 0.838 ..P WKT 2010 06 30 12 11 55 31.3200 -97.3300 251.000 457.0 79.078 3.010 -999.990 -999.990 0.791 ..P WKT 2010 06 30 12 12 25 31.3200 -97.3300 251.000 457.0 82.273 2.910 -999.990 -999.990 0.823 ..P WKT 2010 06 30 12 12 55 31.3200 -97.3300 251.000 457.0 82.349 4.310 -999.990 -999.990 0.823 ..P WKT 2010 06 30 12 13 25 31.3200 -97.3300 251.000 457.0 83.558 3.400 -999.990 -999.990 0.836 ..P WKT 2010 06 30 12 13 55 31.3200 -97.3300 251.000 457.0 86.754 3.160 -999.990 -999.990 0.868 ..P WKT 2010 06 30 12 14 25 31.3200 -97.3300 251.000 457.0 83.994 3.100 -999.990 -999.990 0.840 ..P WKT 2010 06 30 12 14 55 31.3200 -97.3300 251.000 457.0 83.502 3.300 -999.990 -999.990 0.835 ..P WKT 2010 06 30 12 19 55 31.3200 -97.3300 251.000 30.0 118.283 3.570 -999.990 -999.990 1.183 ..P WKT 2010 06 30 12 24 55 31.3200 -97.3300 251.000 122.0 111.097 3.620 -999.990 -999.990 1.111 ..P WKT 2010 06 30 12 29 55 31.3200 -97.3300 251.000 457.0 85.201 3.170 -999.990 -999.990 0.852 ..P WKT 2010 06 30 12 34 55 31.3200 -97.3300 251.000 30.0 118.272 3.640 -999.990 -999.990 1.183 ..P WKT 2010 06 30 12 39 55 31.3200 -97.3300 251.000 122.0 121.009 3.370 -999.990 -999.990 1.210 ..P WKT 2010 06 30 12 44 55 31.3200 -97.3300 251.000 457.0 94.269 2.640 -999.990 -999.990 0.943 ..P WKT 2010 06 30 12 54 55 31.3200 -97.3300 251.000 30.0 122.356 2.840 -999.990 -999.990 1.224 ..P WKT 2010 06 30 12 59 55 31.3200 -97.3300 251.000 122.0 116.533 2.870 -999.990 -999.990 1.165 ..P WKT 2010 06 30 13 04 55 31.3200 -97.3300 251.000 457.0 88.610 4.100 -999.990 -999.990 0.886 ..P WKT 2010 06 30 13 09 55 31.3200 -97.3300 251.000 30.0 117.070 2.670 -999.990 -999.990 1.171 ..P WKT 2010 06 30 13 14 55 31.3200 -97.3300 251.000 122.0 118.614 2.590 -999.990 -999.990 1.186 ..P WKT 2010 06 30 13 19 55 31.3200 -97.3300 251.000 457.0 85.317 3.430 -999.990 -999.990 0.853 ..P WKT 2010 06 30 13 29 55 31.3200 -97.3300 251.000 30.0 129.311 3.310 -999.990 -999.990 1.293 ..P WKT 2010 06 30 13 34 55 31.3200 -97.3300 251.000 122.0 126.301 3.290 -999.990 -999.990 1.263 ..P WKT 2010 06 30 13 39 55 31.3200 -97.3300 251.000 457.0 102.906 3.330 -999.990 -999.990 1.029 ..P WKT 2010 06 30 13 44 55 31.3200 -97.3300 251.000 30.0 137.272 4.140 -999.990 -999.990 1.373 ..P WKT 2010 06 30 13 49 55 31.3200 -97.3300 251.000 122.0 148.843 3.670 -999.990 -999.990 1.488 ..P WKT 2010 06 30 13 54 55 31.3200 -97.3300 251.000 457.0 93.605 4.170 -999.990 -999.990 0.936 ..P WKT 2010 06 30 14 04 55 31.3200 -97.3300 251.000 30.0 145.577 3.910 -999.990 -999.990 1.456 ..P WKT 2010 06 30 14 09 55 31.3200 -97.3300 251.000 122.0 150.592 3.780 -999.990 -999.990 1.506 ..P WKT 2010 06 30 14 14 55 31.3200 -97.3300 251.000 457.0 83.732 3.660 -999.990 -999.990 0.837 ..P WKT 2010 06 30 14 19 55 31.3200 -97.3300 251.000 30.0 142.230 4.740 -999.990 -999.990 1.422 ..P WKT 2010 06 30 14 24 55 31.3200 -97.3300 251.000 122.0 149.792 3.920 -999.990 -999.990 1.498 ..P WKT 2010 06 30 14 29 55 31.3200 -97.3300 251.000 457.0 84.788 3.310 -999.990 -999.990 0.848 ..P WKT 2010 06 30 14 39 55 31.3200 -97.3300 251.000 30.0 133.051 3.300 -999.990 -999.990 1.331 ..P WKT 2010 06 30 14 44 55 31.3200 -97.3300 251.000 122.0 135.561 3.640 -999.990 -999.990 1.356 ..P WKT 2010 06 30 14 49 55 31.3200 -97.3300 251.000 457.0 118.698 4.060 -999.990 -999.990 1.187 ..P WKT 2010 06 30 14 54 55 31.3200 -97.3300 251.000 30.0 128.135 6.870 -999.990 -999.990 1.281 ..P WKT 2010 06 30 14 59 55 31.3200 -97.3300 251.000 122.0 124.848 3.170 -999.990 -999.990 1.248 ..P WKT 2010 06 30 15 04 55 31.3200 -97.3300 251.000 457.0 104.032 3.660 -999.990 -999.990 1.040 ..P WKT 2010 06 30 15 14 55 31.3200 -97.3300 251.000 30.0 120.603 3.330 -999.990 -999.990 1.206 ..P WKT 2010 06 30 15 19 55 31.3200 -97.3300 251.000 122.0 118.549 3.320 -999.990 -999.990 1.185 ..P WKT 2010 06 30 15 24 55 31.3200 -97.3300 251.000 457.0 99.538 3.630 -999.990 -999.990 0.995 ..P WKT 2010 06 30 15 29 55 31.3200 -97.3300 251.000 30.0 113.029 3.900 -999.990 -999.990 1.130 ..P WKT 2010 06 30 15 34 55 31.3200 -97.3300 251.000 122.0 118.323 4.270 -999.990 -999.990 1.183 ..P WKT 2010 06 30 15 39 55 31.3200 -97.3300 251.000 457.0 104.968 4.080 -999.990 -999.990 1.050 ..P WKT 2010 06 30 15 49 55 31.3200 -97.3300 251.000 30.0 118.784 4.180 -999.990 -999.990 1.188 ..P WKT 2010 06 30 15 54 55 31.3200 -97.3300 251.000 122.0 120.524 3.860 -999.990 -999.990 1.205 ..P WKT 2010 06 30 15 59 55 31.3200 -97.3300 251.000 457.0 108.990 3.830 -999.990 -999.990 1.090 ..P WKT 2010 06 30 16 04 55 31.3200 -97.3300 251.000 30.0 108.189 3.620 -999.990 -999.990 1.082 ..P WKT 2010 06 30 16 09 55 31.3200 -97.3300 251.000 122.0 107.390 3.590 -999.990 -999.990 1.074 ..P WKT 2010 06 30 16 14 55 31.3200 -97.3300 251.000 457.0 101.506 3.190 -999.990 -999.990 1.015 ..P WKT 2010 06 30 16 24 55 31.3200 -97.3300 251.000 30.0 114.669 3.990 -999.990 -999.990 1.147 ..P WKT 2010 06 30 16 29 55 31.3200 -97.3300 251.000 122.0 117.054 3.510 -999.990 -999.990 1.171 ..P WKT 2010 06 30 16 34 55 31.3200 -97.3300 251.000 457.0 111.253 2.790 -999.990 -999.990 1.113 ..P WKT 2010 06 30 16 39 55 31.3200 -97.3300 251.000 30.0 112.226 3.760 -999.990 -999.990 1.122 ..P WKT 2010 06 30 16 44 55 31.3200 -97.3300 251.000 122.0 121.385 2.940 -999.990 -999.990 1.214 ..P WKT 2010 06 30 16 49 55 31.3200 -97.3300 251.000 457.0 124.615 2.840 -999.990 -999.990 1.246 ..P WKT 2010 06 30 17 04 55 31.3200 -97.3300 251.000 30.0 112.151 2.790 -999.990 -999.990 1.122 ..P WKT 2010 06 30 17 09 55 31.3200 -97.3300 251.000 122.0 108.961 4.500 -999.990 -999.990 1.090 ..P WKT 2010 06 30 17 14 55 31.3200 -97.3300 251.000 457.0 106.336 3.480 -999.990 -999.990 1.063 ..P WKT 2010 06 30 17 19 55 31.3200 -97.3300 251.000 30.0 104.275 3.670 -999.990 -999.990 1.043 ..P WKT 2010 06 30 17 24 55 31.3200 -97.3300 251.000 122.0 101.932 3.710 -999.990 -999.990 1.019 ..P WKT 2010 06 30 17 29 55 31.3200 -97.3300 251.000 457.0 105.372 3.460 -999.990 -999.990 1.054 ..P WKT 2010 06 30 17 39 55 31.3200 -97.3300 251.000 30.0 103.883 3.520 -999.990 -999.990 1.039 ..P WKT 2010 06 30 17 44 55 31.3200 -97.3300 251.000 122.0 108.118 4.180 -999.990 -999.990 1.081 ..P WKT 2010 06 30 17 49 55 31.3200 -97.3300 251.000 457.0 101.218 3.570 -999.990 -999.990 1.012 ..P WKT 2010 06 30 17 54 55 31.3200 -97.3300 251.000 30.0 98.970 4.090 -999.990 -999.990 0.990 ..P WKT 2010 06 30 17 59 55 31.3200 -97.3300 251.000 122.0 103.627 4.110 -999.990 -999.990 1.036 ..P WKT 2010 06 30 18 04 55 31.3200 -97.3300 251.000 457.0 104.339 5.560 -999.990 -999.990 1.043 ..P WKT 2010 06 30 18 14 55 31.3200 -97.3300 251.000 30.0 100.589 4.310 -999.990 -999.990 1.006 ..P WKT 2010 06 30 18 19 55 31.3200 -97.3300 251.000 122.0 105.285 3.910 -999.990 -999.990 1.053 ..P WKT 2010 06 30 18 24 55 31.3200 -97.3300 251.000 457.0 101.107 3.340 -999.990 -999.990 1.011 ..P WKT 2010 06 30 18 29 55 31.3200 -97.3300 251.000 30.0 83.549 3.500 -999.990 -999.990 0.835 ..P WKT 2010 06 30 18 34 55 31.3200 -97.3300 251.000 122.0 86.133 3.580 -999.990 -999.990 0.861 ..P WKT 2010 06 30 18 39 55 31.3200 -97.3300 251.000 457.0 74.353 3.620 -999.990 -999.990 0.744 ..P WKT 2010 06 30 18 49 55 31.3200 -97.3300 251.000 30.0 88.210 3.480 -999.990 -999.990 0.882 ..P WKT 2010 06 30 18 54 55 31.3200 -97.3300 251.000 122.0 88.078 3.470 -999.990 -999.990 0.881 ..P WKT 2010 06 30 18 59 55 31.3200 -97.3300 251.000 457.0 92.309 3.550 -999.990 -999.990 0.923 ..P WKT 2010 06 30 19 04 55 31.3200 -97.3300 251.000 30.0 85.279 4.320 -999.990 -999.990 0.853 ..P WKT 2010 06 30 19 09 55 31.3200 -97.3300 251.000 122.0 99.362 3.640 -999.990 -999.990 0.994 ..P WKT 2010 06 30 19 14 55 31.3200 -97.3300 251.000 457.0 102.465 3.810 -999.990 -999.990 1.025 ..P WKT 2010 06 30 19 24 55 31.3200 -97.3300 251.000 30.0 92.489 3.640 -999.990 -999.990 0.925 ..P WKT 2010 06 30 19 29 55 31.3200 -97.3300 251.000 122.0 107.691 3.510 -999.990 -999.990 1.077 ..P WKT 2010 06 30 19 34 55 31.3200 -97.3300 251.000 457.0 99.820 2.990 -999.990 -999.990 0.998 ..P WKT 2010 06 30 19 39 55 31.3200 -97.3300 251.000 30.0 110.799 3.640 -999.990 -999.990 1.108 ..P WKT 2010 06 30 19 44 55 31.3200 -97.3300 251.000 122.0 112.494 3.100 -999.990 -999.990 1.125 ..P WKT 2010 06 30 19 49 55 31.3200 -97.3300 251.000 457.0 106.593 4.130 -999.990 -999.990 1.066 ..P WKT 2010 06 30 19 59 55 31.3200 -97.3300 251.000 30.0 108.052 4.670 -999.990 -999.990 1.081 ..P WKT 2010 06 30 20 04 55 31.3200 -97.3300 251.000 122.0 102.756 3.320 -999.990 -999.990 1.028 ..P WKT 2010 06 30 20 09 55 31.3200 -97.3300 251.000 457.0 111.239 3.780 -999.990 -999.990 1.112 ..P WKT 2010 06 30 20 14 55 31.3200 -97.3300 251.000 30.0 109.318 3.550 -999.990 -999.990 1.093 ..P WKT 2010 06 30 20 19 55 31.3200 -97.3300 251.000 122.0 110.488 3.840 -999.990 -999.990 1.105 ..P WKT 2010 06 30 20 24 55 31.3200 -97.3300 251.000 457.0 100.697 4.120 -999.990 -999.990 1.007 ..P WKT 2010 06 30 20 34 55 31.3200 -97.3300 251.000 30.0 94.608 3.770 -999.990 -999.990 0.946 ..P WKT 2010 06 30 20 39 55 31.3200 -97.3300 251.000 122.0 92.409 3.660 -999.990 -999.990 0.924 ..P WKT 2010 06 30 20 44 55 31.3200 -97.3300 251.000 457.0 99.200 3.750 -999.990 -999.990 0.992 ..P WKT 2010 06 30 20 49 55 31.3200 -97.3300 251.000 30.0 89.414 4.230 -999.990 -999.990 0.894 ..P WKT 2010 06 30 20 54 55 31.3200 -97.3300 251.000 122.0 101.543 4.140 -999.990 -999.990 1.015 ..P WKT 2010 06 30 20 59 55 31.3200 -97.3300 251.000 457.0 98.781 5.240 -999.990 -999.990 0.988 ..P WKT 2010 06 30 21 09 55 31.3200 -97.3300 251.000 30.0 93.119 4.280 -999.990 -999.990 0.931 ..P WKT 2010 06 30 21 14 55 31.3200 -97.3300 251.000 122.0 106.226 4.050 -999.990 -999.990 1.062 ..P WKT 2010 06 30 21 19 55 31.3200 -97.3300 251.000 457.0 102.200 3.920 -999.990 -999.990 1.022 ..P WKT 2010 06 30 21 24 55 31.3200 -97.3300 251.000 30.0 98.317 3.790 -999.990 -999.990 0.983 ..P WKT 2010 06 30 21 29 55 31.3200 -97.3300 251.000 122.0 105.384 3.320 -999.990 -999.990 1.054 ..P WKT 2010 06 30 21 34 55 31.3200 -97.3300 251.000 457.0 94.061 3.590 -999.990 -999.990 0.941 ..P WKT 2010 06 30 21 44 55 31.3200 -97.3300 251.000 30.0 109.133 4.200 -999.990 -999.990 1.091 ..P WKT 2010 06 30 21 49 55 31.3200 -97.3300 251.000 122.0 103.387 3.230 -999.990 -999.990 1.034 ..P WKT 2010 06 30 21 54 55 31.3200 -97.3300 251.000 457.0 75.611 4.350 -999.990 -999.990 0.756 ..P WKT 2010 06 30 21 59 55 31.3200 -97.3300 251.000 30.0 84.600 3.000 -999.990 -999.990 0.846 ..P WKT 2010 06 30 22 04 55 31.3200 -97.3300 251.000 122.0 88.537 3.850 -999.990 -999.990 0.885 ..P WKT 2010 06 30 22 09 55 31.3200 -97.3300 251.000 457.0 84.337 3.100 -999.990 -999.990 0.843 ..P WKT 2010 06 30 22 19 55 31.3200 -97.3300 251.000 30.0 93.731 4.330 -999.990 -999.990 0.937 ..P WKT 2010 06 30 22 24 55 31.3200 -97.3300 251.000 122.0 97.926 4.420 -999.990 -999.990 0.979 ..P WKT 2010 06 30 22 29 55 31.3200 -97.3300 251.000 457.0 88.799 4.230 -999.990 -999.990 0.888 ..P WKT 2010 06 30 22 34 55 31.3200 -97.3300 251.000 30.0 99.023 4.350 -999.990 -999.990 0.990 ..P WKT 2010 06 30 22 39 55 31.3200 -97.3300 251.000 122.0 101.814 4.050 -999.990 -999.990 1.018 ..P WKT 2010 06 30 22 44 55 31.3200 -97.3300 251.000 457.0 95.633 3.540 -999.990 -999.990 0.956 ..P WKT 2010 06 30 22 54 55 31.3200 -97.3300 251.000 30.0 94.707 3.640 -999.990 -999.990 0.947 ..P WKT 2010 06 30 22 59 55 31.3200 -97.3300 251.000 122.0 96.177 5.890 -999.990 -999.990 0.962 ..P WKT 2010 06 30 23 04 55 31.3200 -97.3300 251.000 457.0 97.646 3.710 -999.990 -999.990 0.976 ..P WKT 2010 06 30 23 09 55 31.3200 -97.3300 251.000 30.0 98.555 4.220 -999.990 -999.990 0.986 ..P WKT 2010 06 30 23 14 55 31.3200 -97.3300 251.000 122.0 105.907 5.350 -999.990 -999.990 1.059 ..P WKT 2010 06 30 23 19 55 31.3200 -97.3300 251.000 457.0 97.709 4.120 -999.990 -999.990 0.977 ..P WKT 2010 06 30 23 29 55 31.3200 -97.3300 251.000 30.0 106.918 4.270 -999.990 -999.990 1.069 ..P WKT 2010 06 30 23 34 55 31.3200 -97.3300 251.000 122.0 106.395 3.440 -999.990 -999.990 1.064 ..P WKT 2010 06 30 23 39 55 31.3200 -97.3300 251.000 457.0 102.511 3.900 -999.990 -999.990 1.025 ..P WKT 2010 06 30 23 44 55 31.3200 -97.3300 251.000 30.0 104.788 5.340 -999.990 -999.990 1.048 ..P WKT 2010 06 30 23 49 55 31.3200 -97.3300 251.000 122.0 100.625 5.150 -999.990 -999.990 1.006 ..P