# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-06-02 08:40:10 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO (In Situ) # Arlyn Andrews # tel: (303) 497-6773 # email: Arlyn.Andrews@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "Blackland Research and Extension Center-Texas Agricultural # Experiment Station" without whom these measurements would not # be possible. # # URL: http://www.pinnacletowers.com/ # # Sensors were installed on the KWKT-TV transmitter tower in February # 2001. In May 2006, this site became the first to use our newly # redesigned instrumentation suite. The upgrades were made in # time for the Texas Air Quality Study 2006 . We also carried # out a demonstration study during 2006 where an O3 sensor was # mounted at our highest sampling level (457 m above ground level). # The O3 data showed clear evidence of nighttime transport of # ozone in the nocturnal jet at the top of the planetary boundary # layer. This site periodically samples air that has passed over # the Dallas - Fort Worth and Houston metropolitan areas. At other # times, the site samples relatively clean air from the Gulf of # Mexico. Summertime weather patterns are dominated by a monsoonal # circulation over the Gulf. WKT thus provides a measurement of # the initial CO2 concentration for air passing over the continent # from the south. As air moves northward, the CO2 concentration # is modified by the action of sources (fossil fuel combustion, # plant respiration, biomass burning, cement production) and sinks # (photosynthesis). Partners: Blackland Research and Extension # Center-Texas Agricultural Experiment Station (Onyango Okello). # # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # code yr mo dy hr mn sc lat lon elev(masl) ht(magl) value totunc atmvar measunc scaleunc flag WKT 2010 08 01 00 09 55 31.3200 -97.3300 251.000 457.0 106.100 3.970 -999.990 -999.990 1.061 ..P WKT 2010 08 01 00 10 25 31.3200 -97.3300 251.000 457.0 103.606 3.980 -999.990 -999.990 1.036 ..P WKT 2010 08 01 00 10 55 31.3200 -97.3300 251.000 457.0 104.700 4.370 -999.990 -999.990 1.047 ..P WKT 2010 08 01 00 11 25 31.3200 -97.3300 251.000 457.0 105.243 5.010 -999.990 -999.990 1.052 ..P WKT 2010 08 01 00 11 55 31.3200 -97.3300 251.000 457.0 104.958 4.560 -999.990 -999.990 1.050 ..P WKT 2010 08 01 00 12 25 31.3200 -97.3300 251.000 457.0 102.049 3.850 -999.990 -999.990 1.020 ..P WKT 2010 08 01 00 12 55 31.3200 -97.3300 251.000 457.0 99.278 4.150 -999.990 -999.990 0.993 ..P WKT 2010 08 01 00 13 25 31.3200 -97.3300 251.000 457.0 97.474 4.430 -999.990 -999.990 0.975 ..P WKT 2010 08 01 00 13 55 31.3200 -97.3300 251.000 457.0 102.020 3.930 -999.990 -999.990 1.020 ..P WKT 2010 08 01 00 14 25 31.3200 -97.3300 251.000 457.0 99.111 3.770 -999.990 -999.990 0.991 ..P WKT 2010 08 01 00 14 55 31.3200 -97.3300 251.000 457.0 103.519 3.840 -999.990 -999.990 1.035 ..P WKT 2010 08 01 00 19 55 31.3200 -97.3300 251.000 30.0 98.729 6.050 -999.990 -999.990 0.987 ..P WKT 2010 08 01 00 24 55 31.3200 -97.3300 251.000 122.0 110.367 4.720 -999.990 -999.990 1.104 ..P WKT 2010 08 01 00 29 55 31.3200 -97.3300 251.000 457.0 99.364 3.690 -999.990 -999.990 0.994 ..P WKT 2010 08 01 00 34 55 31.3200 -97.3300 251.000 30.0 97.335 3.430 -999.990 -999.990 0.973 ..P WKT 2010 08 01 00 39 55 31.3200 -97.3300 251.000 122.0 108.007 4.090 -999.990 -999.990 1.080 ..P WKT 2010 08 01 00 44 55 31.3200 -97.3300 251.000 457.0 102.664 3.100 -999.990 -999.990 1.027 ..P WKT 2010 08 01 00 54 55 31.3200 -97.3300 251.000 30.0 100.369 3.210 -999.990 -999.990 1.004 ..P WKT 2010 08 01 00 59 55 31.3200 -97.3300 251.000 122.0 95.410 3.100 -999.990 -999.990 0.954 ..P WKT 2010 08 01 01 04 55 31.3200 -97.3300 251.000 457.0 95.421 2.670 -999.990 -999.990 0.954 ..P WKT 2010 08 01 01 09 55 31.3200 -97.3300 251.000 30.0 97.364 3.090 -999.990 -999.990 0.974 ..P WKT 2010 08 01 01 14 55 31.3200 -97.3300 251.000 122.0 90.471 2.790 -999.990 -999.990 0.905 ..P WKT 2010 08 01 01 19 55 31.3200 -97.3300 251.000 457.0 95.453 4.700 -999.990 -999.990 0.955 ..P WKT 2010 08 01 01 29 55 31.3200 -97.3300 251.000 30.0 97.882 2.130 -999.990 -999.990 0.979 ..P WKT 2010 08 01 01 34 55 31.3200 -97.3300 251.000 122.0 94.499 2.360 -999.990 -999.990 0.945 ..P WKT 2010 08 01 01 39 55 31.3200 -97.3300 251.000 457.0 81.727 2.730 -999.990 -999.990 0.817 ..P WKT 2010 08 01 01 44 55 31.3200 -97.3300 251.000 30.0 97.678 4.040 -999.990 -999.990 0.977 ..P WKT 2010 08 01 01 49 55 31.3200 -97.3300 251.000 122.0 98.714 2.830 -999.990 -999.990 0.987 ..P WKT 2010 08 01 01 54 55 31.3200 -97.3300 251.000 457.0 91.741 3.380 -999.990 -999.990 0.917 ..P WKT 2010 08 01 02 04 55 31.3200 -97.3300 251.000 30.0 99.003 3.520 -999.990 -999.990 0.990 ..P WKT 2010 08 01 02 09 55 31.3200 -97.3300 251.000 122.0 97.495 3.470 -999.990 -999.990 0.975 ..P WKT 2010 08 01 02 14 55 31.3200 -97.3300 251.000 457.0 88.529 3.190 -999.990 -999.990 0.885 ..P WKT 2010 08 01 02 19 55 31.3200 -97.3300 251.000 30.0 102.213 3.320 -999.990 -999.990 1.022 ..P WKT 2010 08 01 02 24 55 31.3200 -97.3300 251.000 122.0 106.229 3.360 -999.990 -999.990 1.062 ..P WKT 2010 08 01 02 29 55 31.3200 -97.3300 251.000 457.0 96.019 4.130 -999.990 -999.990 0.960 ..P WKT 2010 08 01 02 39 55 31.3200 -97.3300 251.000 30.0 101.388 4.120 -999.990 -999.990 1.014 ..P WKT 2010 08 01 02 44 55 31.3200 -97.3300 251.000 122.0 98.597 3.780 -999.990 -999.990 0.986 ..P WKT 2010 08 01 02 49 55 31.3200 -97.3300 251.000 457.0 86.275 3.180 -999.990 -999.990 0.863 ..P WKT 2010 08 01 02 54 55 31.3200 -97.3300 251.000 30.0 112.077 3.430 -999.990 -999.990 1.121 ..P WKT 2010 08 01 02 59 55 31.3200 -97.3300 251.000 122.0 101.550 3.260 -999.990 -999.990 1.016 ..P WKT 2010 08 01 03 04 55 31.3200 -97.3300 251.000 457.0 91.437 5.100 -999.990 -999.990 0.914 ..P WKT 2010 08 01 03 14 55 31.3200 -97.3300 251.000 30.0 105.570 2.610 -999.990 -999.990 1.056 ..P WKT 2010 08 01 03 19 55 31.3200 -97.3300 251.000 122.0 103.153 3.260 -999.990 -999.990 1.032 ..P WKT 2010 08 01 03 24 55 31.3200 -97.3300 251.000 457.0 91.757 2.430 -999.990 -999.990 0.918 ..P WKT 2010 08 01 03 29 55 31.3200 -97.3300 251.000 30.0 101.083 3.430 -999.990 -999.990 1.011 ..P WKT 2010 08 01 03 34 55 31.3200 -97.3300 251.000 122.0 99.910 2.570 -999.990 -999.990 0.999 ..P WKT 2010 08 01 03 39 55 31.3200 -97.3300 251.000 457.0 97.079 2.300 -999.990 -999.990 0.971 ..P WKT 2010 08 01 03 49 55 31.3200 -97.3300 251.000 30.0 101.127 1.720 -999.990 -999.990 1.011 ..P WKT 2010 08 01 03 54 55 31.3200 -97.3300 251.000 122.0 101.789 2.460 -999.990 -999.990 1.018 ..P WKT 2010 08 01 03 59 55 31.3200 -97.3300 251.000 457.0 83.799 2.380 -999.990 -999.990 0.838 ..P WKT 2010 08 01 04 04 55 31.3200 -97.3300 251.000 30.0 96.067 3.050 -999.990 -999.990 0.961 ..P WKT 2010 08 01 04 09 55 31.3200 -97.3300 251.000 122.0 99.078 2.690 -999.990 -999.990 0.991 ..P WKT 2010 08 01 04 14 55 31.3200 -97.3300 251.000 457.0 82.745 4.360 -999.990 -999.990 0.827 ..P WKT 2010 08 01 04 24 55 31.3200 -97.3300 251.000 30.0 94.610 2.950 -999.990 -999.990 0.946 ..P WKT 2010 08 01 04 29 55 31.3200 -97.3300 251.000 122.0 97.522 2.660 -999.990 -999.990 0.975 ..P WKT 2010 08 01 04 34 55 31.3200 -97.3300 251.000 457.0 87.861 3.900 -999.990 -999.990 0.879 ..P WKT 2010 08 01 04 39 55 31.3200 -97.3300 251.000 30.0 100.032 2.350 -999.990 -999.990 1.000 ..P WKT 2010 08 01 04 44 55 31.3200 -97.3300 251.000 122.0 94.239 3.590 -999.990 -999.990 0.942 ..P WKT 2010 08 01 04 49 55 31.3200 -97.3300 251.000 457.0 88.169 2.030 -999.990 -999.990 0.882 ..P WKT 2010 08 01 05 04 55 31.3200 -97.3300 251.000 30.0 85.645 2.680 -999.990 -999.990 0.856 ..P WKT 2010 08 01 05 09 55 31.3200 -97.3300 251.000 122.0 95.571 1.990 -999.990 -999.990 0.956 ..P WKT 2010 08 01 05 14 55 31.3200 -97.3300 251.000 457.0 91.401 2.440 -999.990 -999.990 0.914 ..P WKT 2010 08 01 05 19 55 31.3200 -97.3300 251.000 30.0 93.589 2.540 -999.990 -999.990 0.936 ..P WKT 2010 08 01 05 24 55 31.3200 -97.3300 251.000 122.0 89.972 1.950 -999.990 -999.990 0.900 ..P WKT 2010 08 01 05 29 55 31.3200 -97.3300 251.000 457.0 89.948 2.210 -999.990 -999.990 0.899 ..P WKT 2010 08 01 05 39 55 31.3200 -97.3300 251.000 30.0 91.475 1.920 -999.990 -999.990 0.915 ..P WKT 2010 08 01 05 44 55 31.3200 -97.3300 251.000 122.0 91.367 3.090 -999.990 -999.990 0.914 ..P WKT 2010 08 01 05 49 55 31.3200 -97.3300 251.000 457.0 93.194 3.230 -999.990 -999.990 0.932 ..P WKT 2010 08 01 05 54 55 31.3200 -97.3300 251.000 30.0 94.193 3.250 -999.990 -999.990 0.942 ..P WKT 2010 08 01 05 59 55 31.3200 -97.3300 251.000 122.0 99.891 3.640 -999.990 -999.990 0.999 ..P WKT 2010 08 01 06 04 55 31.3200 -97.3300 251.000 457.0 90.660 2.250 -999.990 -999.990 0.907 ..P WKT 2010 08 01 06 14 55 31.3200 -97.3300 251.000 30.0 92.854 1.810 -999.990 -999.990 0.929 ..P WKT 2010 08 01 06 19 55 31.3200 -97.3300 251.000 122.0 98.473 2.660 -999.990 -999.990 0.985 ..P WKT 2010 08 01 06 24 55 31.3200 -97.3300 251.000 457.0 90.960 3.080 -999.990 -999.990 0.910 ..P WKT 2010 08 01 06 29 55 31.3200 -97.3300 251.000 30.0 92.708 2.830 -999.990 -999.990 0.927 ..P WKT 2010 08 01 06 34 55 31.3200 -97.3300 251.000 122.0 95.425 2.480 -999.990 -999.990 0.954 ..P WKT 2010 08 01 06 39 55 31.3200 -97.3300 251.000 457.0 83.349 2.240 -999.990 -999.990 0.833 ..P WKT 2010 08 01 06 49 55 31.3200 -97.3300 251.000 30.0 96.603 2.270 -999.990 -999.990 0.966 ..P WKT 2010 08 01 06 54 55 31.3200 -97.3300 251.000 122.0 105.068 3.870 -999.990 -999.990 1.051 ..P WKT 2010 08 01 06 59 55 31.3200 -97.3300 251.000 457.0 86.848 2.150 -999.990 -999.990 0.868 ..P WKT 2010 08 01 07 04 55 31.3200 -97.3300 251.000 30.0 101.396 2.660 -999.990 -999.990 1.014 ..P WKT 2010 08 01 07 09 55 31.3200 -97.3300 251.000 122.0 105.021 2.570 -999.990 -999.990 1.050 ..P WKT 2010 08 01 07 14 55 31.3200 -97.3300 251.000 457.0 84.865 1.940 -999.990 -999.990 0.849 ..P WKT 2010 08 01 07 24 55 31.3200 -97.3300 251.000 30.0 100.077 1.500 -999.990 -999.990 1.001 ..P WKT 2010 08 01 07 29 55 31.3200 -97.3300 251.000 122.0 118.024 2.560 -999.990 -999.990 1.180 ..P WKT 2010 08 01 07 34 55 31.3200 -97.3300 251.000 457.0 89.511 4.960 -999.990 -999.990 0.895 ..P WKT 2010 08 01 07 39 55 31.3200 -97.3300 251.000 30.0 102.895 3.070 -999.990 -999.990 1.029 ..P WKT 2010 08 01 07 44 55 31.3200 -97.3300 251.000 122.0 112.822 2.990 -999.990 -999.990 1.128 ..P WKT 2010 08 01 07 49 55 31.3200 -97.3300 251.000 457.0 89.010 2.340 -999.990 -999.990 0.890 ..P WKT 2010 08 01 07 59 55 31.3200 -97.3300 251.000 30.0 107.778 1.780 -999.990 -999.990 1.078 ..P WKT 2010 08 01 08 04 55 31.3200 -97.3300 251.000 122.0 111.365 3.230 -999.990 -999.990 1.114 ..P WKT 2010 08 01 08 09 55 31.3200 -97.3300 251.000 457.0 76.093 3.610 -999.990 -999.990 0.761 ..P WKT 2010 08 01 08 14 55 31.3200 -97.3300 251.000 30.0 112.178 4.680 -999.990 -999.990 1.122 ..P WKT 2010 08 01 08 19 55 31.3200 -97.3300 251.000 122.0 112.446 3.170 -999.990 -999.990 1.124 ..P WKT 2010 08 01 08 24 55 31.3200 -97.3300 251.000 457.0 82.703 2.520 -999.990 -999.990 0.827 ..P WKT 2010 08 01 08 34 55 31.3200 -97.3300 251.000 30.0 111.610 1.960 -999.990 -999.990 1.116 ..P WKT 2010 08 01 08 39 55 31.3200 -97.3300 251.000 122.0 111.068 2.910 -999.990 -999.990 1.111 ..P WKT 2010 08 01 08 44 55 31.3200 -97.3300 251.000 457.0 84.801 3.260 -999.990 -999.990 0.848 ..P WKT 2010 08 01 08 49 55 31.3200 -97.3300 251.000 30.0 111.920 5.000 -999.990 -999.990 1.119 ..P WKT 2010 08 01 08 54 55 31.3200 -97.3300 251.000 122.0 102.526 3.900 -999.990 -999.990 1.025 ..P WKT 2010 08 01 08 59 55 31.3200 -97.3300 251.000 457.0 79.853 3.000 -999.990 -999.990 0.799 ..P WKT 2010 08 01 09 09 55 31.3200 -97.3300 251.000 30.0 106.234 2.500 -999.990 -999.990 1.062 ..P WKT 2010 08 01 09 14 55 31.3200 -97.3300 251.000 122.0 95.811 4.490 -999.990 -999.990 0.958 ..P WKT 2010 08 01 09 19 55 31.3200 -97.3300 251.000 457.0 80.962 4.480 -999.990 -999.990 0.810 ..P WKT 2010 08 01 09 24 55 31.3200 -97.3300 251.000 30.0 112.314 4.540 -999.990 -999.990 1.123 ..P WKT 2010 08 01 09 29 55 31.3200 -97.3300 251.000 122.0 106.595 3.060 -999.990 -999.990 1.066 ..P WKT 2010 08 01 09 34 55 31.3200 -97.3300 251.000 457.0 85.658 3.240 -999.990 -999.990 0.857 ..P WKT 2010 08 01 09 44 55 31.3200 -97.3300 251.000 30.0 115.363 3.850 -999.990 -999.990 1.154 ..P WKT 2010 08 01 09 49 55 31.3200 -97.3300 251.000 122.0 113.437 3.060 -999.990 -999.990 1.134 ..P WKT 2010 08 01 09 54 55 31.3200 -97.3300 251.000 457.0 90.207 2.720 -999.990 -999.990 0.902 ..P WKT 2010 08 01 09 59 55 31.3200 -97.3300 251.000 30.0 109.863 2.660 -999.990 -999.990 1.099 ..P WKT 2010 08 01 10 04 55 31.3200 -97.3300 251.000 122.0 103.510 2.650 -999.990 -999.990 1.035 ..P WKT 2010 08 01 10 09 55 31.3200 -97.3300 251.000 457.0 76.681 3.450 -999.990 -999.990 0.767 ..P WKT 2010 08 01 10 19 55 31.3200 -97.3300 251.000 30.0 107.556 3.120 -999.990 -999.990 1.076 ..P WKT 2010 08 01 10 24 55 31.3200 -97.3300 251.000 122.0 101.340 2.830 -999.990 -999.990 1.013 ..P WKT 2010 08 01 10 29 55 31.3200 -97.3300 251.000 457.0 81.842 4.550 -999.990 -999.990 0.818 ..P WKT 2010 08 01 10 34 55 31.3200 -97.3300 251.000 30.0 106.620 2.780 -999.990 -999.990 1.066 ..P WKT 2010 08 01 10 39 55 31.3200 -97.3300 251.000 122.0 106.493 1.880 -999.990 -999.990 1.065 ..P WKT 2010 08 01 10 44 55 31.3200 -97.3300 251.000 457.0 86.025 1.640 -999.990 -999.990 0.860 ..P WKT 2010 08 01 10 54 55 31.3200 -97.3300 251.000 30.0 100.378 3.000 -999.990 -999.990 1.004 ..P WKT 2010 08 01 10 59 55 31.3200 -97.3300 251.000 122.0 105.035 2.030 -999.990 -999.990 1.050 ..P WKT 2010 08 01 11 04 55 31.3200 -97.3300 251.000 457.0 77.173 2.050 -999.990 -999.990 0.772 ..P WKT 2010 08 01 11 09 55 31.3200 -97.3300 251.000 30.0 98.296 3.130 -999.990 -999.990 0.983 ..P WKT 2010 08 01 11 14 55 31.3200 -97.3300 251.000 122.0 103.091 3.360 -999.990 -999.990 1.031 ..P WKT 2010 08 01 11 19 55 31.3200 -97.3300 251.000 457.0 74.536 3.700 -999.990 -999.990 0.745 ..P WKT 2010 08 01 11 29 55 31.3200 -97.3300 251.000 30.0 97.488 3.430 -999.990 -999.990 0.975 ..P WKT 2010 08 01 11 34 55 31.3200 -97.3300 251.000 122.0 102.636 3.350 -999.990 -999.990 1.026 ..P WKT 2010 08 01 11 39 55 31.3200 -97.3300 251.000 457.0 78.445 4.070 -999.990 -999.990 0.784 ..P WKT 2010 08 01 11 44 55 31.3200 -97.3300 251.000 30.0 102.970 4.660 -999.990 -999.990 1.030 ..P WKT 2010 08 01 11 49 55 31.3200 -97.3300 251.000 122.0 99.953 3.500 -999.990 -999.990 1.000 ..P WKT 2010 08 01 12 09 55 31.3200 -97.3300 251.000 457.0 72.955 4.160 -999.990 -999.990 0.730 ..P WKT 2010 08 01 12 10 25 31.3200 -97.3300 251.000 457.0 76.580 4.720 -999.990 -999.990 0.766 ..P WKT 2010 08 01 12 10 55 31.3200 -97.3300 251.000 457.0 74.113 4.540 -999.990 -999.990 0.741 ..P WKT 2010 08 01 12 11 25 31.3200 -97.3300 251.000 457.0 73.308 3.290 -999.990 -999.990 0.733 ..P WKT 2010 08 01 12 11 55 31.3200 -97.3300 251.000 457.0 75.132 3.150 -999.990 -999.990 0.751 ..P WKT 2010 08 01 12 12 25 31.3200 -97.3300 251.000 457.0 73.496 3.190 -999.990 -999.990 0.735 ..P WKT 2010 08 01 12 12 55 31.3200 -97.3300 251.000 457.0 75.876 4.070 -999.990 -999.990 0.759 ..P WKT 2010 08 01 12 13 25 31.3200 -97.3300 251.000 457.0 75.347 3.440 -999.990 -999.990 0.753 ..P WKT 2010 08 01 12 13 55 31.3200 -97.3300 251.000 457.0 71.634 4.270 -999.990 -999.990 0.716 ..P WKT 2010 08 01 12 14 25 31.3200 -97.3300 251.000 457.0 73.044 4.020 -999.990 -999.990 0.730 ..P WKT 2010 08 01 12 14 55 31.3200 -97.3300 251.000 457.0 72.792 3.240 -999.990 -999.990 0.728 ..P WKT 2010 08 01 12 19 55 31.3200 -97.3300 251.000 30.0 102.674 2.740 -999.990 -999.990 1.027 ..P WKT 2010 08 01 12 24 55 31.3200 -97.3300 251.000 122.0 101.129 3.230 -999.990 -999.990 1.011 ..P WKT 2010 08 01 12 29 55 31.3200 -97.3300 251.000 457.0 80.890 2.820 -999.990 -999.990 0.809 ..P WKT 2010 08 01 12 34 55 31.3200 -97.3300 251.000 30.0 104.962 2.550 -999.990 -999.990 1.050 ..P WKT 2010 08 01 12 39 55 31.3200 -97.3300 251.000 122.0 106.326 4.200 -999.990 -999.990 1.063 ..P WKT 2010 08 01 12 44 55 31.3200 -97.3300 251.000 457.0 87.744 1.770 -999.990 -999.990 0.877 ..P WKT 2010 08 01 12 54 55 31.3200 -97.3300 251.000 30.0 104.439 2.180 -999.990 -999.990 1.044 ..P WKT 2010 08 01 12 59 55 31.3200 -97.3300 251.000 122.0 98.164 1.290 -999.990 -999.990 0.982 ..P WKT 2010 08 01 13 04 55 31.3200 -97.3300 251.000 457.0 87.177 3.010 -999.990 -999.990 0.872 ..P WKT 2010 08 01 13 09 55 31.3200 -97.3300 251.000 30.0 101.682 1.280 -999.990 -999.990 1.017 ..P WKT 2010 08 01 13 14 55 31.3200 -97.3300 251.000 122.0 95.128 2.340 -999.990 -999.990 0.951 ..P WKT 2010 08 01 13 19 55 31.3200 -97.3300 251.000 457.0 85.247 3.120 -999.990 -999.990 0.852 ..P WKT 2010 08 01 13 29 55 31.3200 -97.3300 251.000 30.0 101.752 1.950 -999.990 -999.990 1.018 ..P WKT 2010 08 01 13 34 55 31.3200 -97.3300 251.000 122.0 92.107 1.510 -999.990 -999.990 0.921 ..P WKT 2010 08 01 13 39 55 31.3200 -97.3300 251.000 457.0 79.411 2.920 -999.990 -999.990 0.794 ..P WKT 2010 08 01 13 44 55 31.3200 -97.3300 251.000 30.0 104.141 3.110 -999.990 -999.990 1.041 ..P WKT 2010 08 01 13 49 55 31.3200 -97.3300 251.000 122.0 98.376 2.970 -999.990 -999.990 0.984 ..P WKT 2010 08 01 13 54 55 31.3200 -97.3300 251.000 457.0 75.974 5.060 -999.990 -999.990 0.760 ..P WKT 2010 08 01 14 04 55 31.3200 -97.3300 251.000 30.0 87.513 2.110 -999.990 -999.990 0.875 ..P WKT 2010 08 01 14 09 55 31.3200 -97.3300 251.000 122.0 95.949 2.480 -999.990 -999.990 0.959 ..P WKT 2010 08 01 14 14 55 31.3200 -97.3300 251.000 457.0 76.651 4.810 -999.990 -999.990 0.767 ..P WKT 2010 08 01 14 19 55 31.3200 -97.3300 251.000 30.0 90.772 3.690 -999.990 -999.990 0.908 ..P WKT 2010 08 01 14 24 55 31.3200 -97.3300 251.000 122.0 104.619 5.870 -999.990 -999.990 1.046 ..P WKT 2010 08 01 14 29 55 31.3200 -97.3300 251.000 457.0 83.098 2.600 -999.990 -999.990 0.831 ..P WKT 2010 08 01 14 39 55 31.3200 -97.3300 251.000 30.0 101.006 3.400 -999.990 -999.990 1.010 ..P WKT 2010 08 01 14 44 55 31.3200 -97.3300 251.000 122.0 106.731 4.440 -999.990 -999.990 1.067 ..P WKT 2010 08 01 14 49 55 31.3200 -97.3300 251.000 457.0 88.316 3.780 -999.990 -999.990 0.883 ..P WKT 2010 08 01 14 54 55 31.3200 -97.3300 251.000 30.0 100.286 3.240 -999.990 -999.990 1.003 ..P WKT 2010 08 01 14 59 55 31.3200 -97.3300 251.000 122.0 105.319 3.760 -999.990 -999.990 1.053 ..P WKT 2010 08 01 15 04 55 31.3200 -97.3300 251.000 457.0 88.842 3.150 -999.990 -999.990 0.888 ..P WKT 2010 08 01 15 14 55 31.3200 -97.3300 251.000 30.0 95.458 3.060 -999.990 -999.990 0.955 ..P WKT 2010 08 01 15 19 55 31.3200 -97.3300 251.000 122.0 105.925 2.890 -999.990 -999.990 1.059 ..P WKT 2010 08 01 15 24 55 31.3200 -97.3300 251.000 457.0 85.994 2.870 -999.990 -999.990 0.860 ..P WKT 2010 08 01 15 29 55 31.3200 -97.3300 251.000 30.0 92.436 3.170 -999.990 -999.990 0.924 ..P WKT 2010 08 01 15 34 55 31.3200 -97.3300 251.000 122.0 102.349 2.820 -999.990 -999.990 1.023 ..P WKT 2010 08 01 15 39 55 31.3200 -97.3300 251.000 457.0 85.885 2.920 -999.990 -999.990 0.859 ..P WKT 2010 08 01 15 49 55 31.3200 -97.3300 251.000 30.0 94.329 2.540 -999.990 -999.990 0.943 ..P WKT 2010 08 01 15 54 55 31.3200 -97.3300 251.000 122.0 104.940 2.080 -999.990 -999.990 1.049 ..P WKT 2010 08 01 15 59 55 31.3200 -97.3300 251.000 457.0 86.944 2.850 -999.990 -999.990 0.869 ..P WKT 2010 08 01 16 04 55 31.3200 -97.3300 251.000 30.0 91.861 3.320 -999.990 -999.990 0.919 ..P WKT 2010 08 01 16 09 55 31.3200 -97.3300 251.000 122.0 96.085 3.430 -999.990 -999.990 0.961 ..P WKT 2010 08 01 16 14 55 31.3200 -97.3300 251.000 457.0 84.334 2.010 -999.990 -999.990 0.843 ..P WKT 2010 08 01 16 24 55 31.3200 -97.3300 251.000 30.0 88.873 2.180 -999.990 -999.990 0.889 ..P WKT 2010 08 01 16 29 55 31.3200 -97.3300 251.000 122.0 108.777 2.720 -999.990 -999.990 1.088 ..P WKT 2010 08 01 16 34 55 31.3200 -97.3300 251.000 457.0 102.285 3.120 -999.990 -999.990 1.023 ..P WKT 2010 08 01 16 39 55 31.3200 -97.3300 251.000 30.0 103.295 2.730 -999.990 -999.990 1.033 ..P WKT 2010 08 01 16 44 55 31.3200 -97.3300 251.000 122.0 110.141 2.570 -999.990 -999.990 1.101 ..P WKT 2010 08 01 16 49 55 31.3200 -97.3300 251.000 457.0 107.539 2.460 -999.990 -999.990 1.075 ..P WKT 2010 08 01 17 04 55 31.3200 -97.3300 251.000 30.0 151.110 2.680 -999.990 -999.990 1.511 ..P WKT 2010 08 01 17 09 55 31.3200 -97.3300 251.000 122.0 136.391 2.740 -999.990 -999.990 1.364 ..P WKT 2010 08 01 17 14 55 31.3200 -97.3300 251.000 457.0 114.998 4.580 -999.990 -999.990 1.150 ..P WKT 2010 08 01 17 19 55 31.3200 -97.3300 251.000 30.0 93.045 4.000 -999.990 -999.990 0.930 ..P WKT 2010 08 01 17 24 55 31.3200 -97.3300 251.000 122.0 97.784 3.170 -999.990 -999.990 0.978 ..P WKT 2010 08 01 17 29 55 31.3200 -97.3300 251.000 457.0 94.738 3.910 -999.990 -999.990 0.947 ..P WKT 2010 08 01 17 39 55 31.3200 -97.3300 251.000 30.0 88.331 3.350 -999.990 -999.990 0.883 ..P WKT 2010 08 01 17 44 55 31.3200 -97.3300 251.000 122.0 102.494 3.900 -999.990 -999.990 1.025 ..P WKT 2010 08 01 17 49 55 31.3200 -97.3300 251.000 457.0 89.954 3.890 -999.990 -999.990 0.900 ..P WKT 2010 08 01 17 54 55 31.3200 -97.3300 251.000 30.0 88.819 4.660 -999.990 -999.990 0.888 ..P WKT 2010 08 01 17 59 55 31.3200 -97.3300 251.000 122.0 101.315 3.950 -999.990 -999.990 1.013 ..P WKT 2010 08 01 18 04 55 31.3200 -97.3300 251.000 457.0 95.728 2.900 -999.990 -999.990 0.957 ..P WKT 2010 08 01 18 14 55 31.3200 -97.3300 251.000 30.0 100.096 3.810 -999.990 -999.990 1.001 ..P WKT 2010 08 01 18 19 55 31.3200 -97.3300 251.000 122.0 110.469 4.100 -999.990 -999.990 1.105 ..P WKT 2010 08 01 18 24 55 31.3200 -97.3300 251.000 457.0 92.737 4.430 -999.990 -999.990 0.927 ..P WKT 2010 08 01 18 29 55 31.3200 -97.3300 251.000 30.0 86.969 4.780 -999.990 -999.990 0.870 ..P WKT 2010 08 01 18 34 55 31.3200 -97.3300 251.000 122.0 99.014 4.290 -999.990 -999.990 0.990 ..P WKT 2010 08 01 18 39 55 31.3200 -97.3300 251.000 457.0 97.421 4.930 -999.990 -999.990 0.974 ..P WKT 2010 08 01 18 49 55 31.3200 -97.3300 251.000 30.0 96.601 4.250 -999.990 -999.990 0.966 ..P WKT 2010 08 01 18 54 55 31.3200 -97.3300 251.000 122.0 104.891 3.840 -999.990 -999.990 1.049 ..P WKT 2010 08 01 18 59 55 31.3200 -97.3300 251.000 457.0 96.616 4.290 -999.990 -999.990 0.966 ..P WKT 2010 08 01 19 04 55 31.3200 -97.3300 251.000 30.0 88.619 4.140 -999.990 -999.990 0.886 ..P WKT 2010 08 01 19 09 55 31.3200 -97.3300 251.000 122.0 101.644 4.160 -999.990 -999.990 1.016 ..P WKT 2010 08 01 19 14 55 31.3200 -97.3300 251.000 457.0 94.481 4.410 -999.990 -999.990 0.945 ..P WKT 2010 08 01 19 24 55 31.3200 -97.3300 251.000 30.0 94.476 3.740 -999.990 -999.990 0.945 ..P WKT 2010 08 01 19 29 55 31.3200 -97.3300 251.000 122.0 108.459 4.060 -999.990 -999.990 1.085 ..P WKT 2010 08 01 19 34 55 31.3200 -97.3300 251.000 457.0 93.198 3.980 -999.990 -999.990 0.932 ..P WKT 2010 08 01 19 39 55 31.3200 -97.3300 251.000 30.0 86.848 4.070 -999.990 -999.990 0.868 ..P WKT 2010 08 01 19 44 55 31.3200 -97.3300 251.000 122.0 99.859 3.790 -999.990 -999.990 0.999 ..P WKT 2010 08 01 19 49 55 31.3200 -97.3300 251.000 457.0 90.444 4.300 -999.990 -999.990 0.904 ..P WKT 2010 08 01 19 59 55 31.3200 -97.3300 251.000 30.0 90.240 4.040 -999.990 -999.990 0.902 ..P WKT 2010 08 01 20 04 55 31.3200 -97.3300 251.000 122.0 100.845 3.880 -999.990 -999.990 1.008 ..P WKT 2010 08 01 20 09 55 31.3200 -97.3300 251.000 457.0 91.945 4.340 -999.990 -999.990 0.919 ..P WKT 2010 08 01 20 14 55 31.3200 -97.3300 251.000 30.0 91.267 4.840 -999.990 -999.990 0.913 ..P WKT 2010 08 01 20 19 55 31.3200 -97.3300 251.000 122.0 99.505 3.570 -999.990 -999.990 0.995 ..P WKT 2010 08 01 20 24 55 31.3200 -97.3300 251.000 457.0 93.809 3.810 -999.990 -999.990 0.938 ..P WKT 2010 08 01 20 34 55 31.3200 -97.3300 251.000 30.0 92.629 3.580 -999.990 -999.990 0.926 ..P WKT 2010 08 01 20 39 55 31.3200 -97.3300 251.000 122.0 108.018 3.870 -999.990 -999.990 1.080 ..P WKT 2010 08 01 20 44 55 31.3200 -97.3300 251.000 457.0 99.435 3.960 -999.990 -999.990 0.994 ..P WKT 2010 08 01 20 49 55 31.3200 -97.3300 251.000 30.0 98.935 3.440 -999.990 -999.990 0.989 ..P WKT 2010 08 01 20 54 55 31.3200 -97.3300 251.000 122.0 101.223 3.990 -999.990 -999.990 1.012 ..P WKT 2010 08 01 20 59 55 31.3200 -97.3300 251.000 457.0 97.655 5.070 -999.990 -999.990 0.977 ..P WKT 2010 08 01 21 09 55 31.3200 -97.3300 251.000 30.0 94.942 3.480 -999.990 -999.990 0.949 ..P WKT 2010 08 01 21 14 55 31.3200 -97.3300 251.000 122.0 107.510 3.490 -999.990 -999.990 1.075 ..P WKT 2010 08 01 21 19 55 31.3200 -97.3300 251.000 457.0 98.882 3.770 -999.990 -999.990 0.989 ..P WKT 2010 08 01 21 24 55 31.3200 -97.3300 251.000 30.0 95.831 4.940 -999.990 -999.990 0.958 ..P WKT 2010 08 01 21 29 55 31.3200 -97.3300 251.000 122.0 108.960 4.210 -999.990 -999.990 1.090 ..P WKT 2010 08 01 21 34 55 31.3200 -97.3300 251.000 457.0 91.962 3.510 -999.990 -999.990 0.920 ..P WKT 2010 08 01 21 44 55 31.3200 -97.3300 251.000 30.0 95.664 4.460 -999.990 -999.990 0.957 ..P WKT 2010 08 01 21 49 55 31.3200 -97.3300 251.000 122.0 101.859 4.100 -999.990 -999.990 1.019 ..P WKT 2010 08 01 21 54 55 31.3200 -97.3300 251.000 457.0 94.662 4.810 -999.990 -999.990 0.947 ..P WKT 2010 08 01 21 59 55 31.3200 -97.3300 251.000 30.0 83.837 6.320 -999.990 -999.990 0.838 ..P WKT 2010 08 01 22 04 55 31.3200 -97.3300 251.000 122.0 101.753 5.000 -999.990 -999.990 1.018 ..P WKT 2010 08 01 22 09 55 31.3200 -97.3300 251.000 457.0 90.230 4.320 -999.990 -999.990 0.902 ..P WKT 2010 08 01 22 19 55 31.3200 -97.3300 251.000 30.0 83.227 4.350 -999.990 -999.990 0.832 ..P WKT 2010 08 01 22 24 55 31.3200 -97.3300 251.000 122.0 97.798 5.440 -999.990 -999.990 0.978 ..P WKT 2010 08 01 22 29 55 31.3200 -97.3300 251.000 457.0 88.226 5.660 -999.990 -999.990 0.882 ..P WKT 2010 08 01 22 34 55 31.3200 -97.3300 251.000 30.0 88.422 6.700 -999.990 -999.990 0.884 ..P WKT 2010 08 01 22 39 55 31.3200 -97.3300 251.000 122.0 95.598 4.110 -999.990 -999.990 0.956 ..P WKT 2010 08 01 22 44 55 31.3200 -97.3300 251.000 457.0 89.932 3.970 -999.990 -999.990 0.899 ..P WKT 2010 08 01 22 54 55 31.3200 -97.3300 251.000 30.0 97.846 4.180 -999.990 -999.990 0.978 ..P WKT 2010 08 01 22 59 55 31.3200 -97.3300 251.000 122.0 111.148 4.490 -999.990 -999.990 1.111 ..P WKT 2010 08 01 23 04 55 31.3200 -97.3300 251.000 457.0 98.759 4.820 -999.990 -999.990 0.988 ..P WKT 2010 08 01 23 09 55 31.3200 -97.3300 251.000 30.0 96.143 5.550 -999.990 -999.990 0.961 ..P WKT 2010 08 01 23 14 55 31.3200 -97.3300 251.000 122.0 103.722 5.790 -999.990 -999.990 1.037 ..P WKT 2010 08 01 23 19 55 31.3200 -97.3300 251.000 457.0 96.359 5.160 -999.990 -999.990 0.964 ..P WKT 2010 08 01 23 29 55 31.3200 -97.3300 251.000 30.0 91.870 5.140 -999.990 -999.990 0.919 ..P WKT 2010 08 01 23 34 55 31.3200 -97.3300 251.000 122.0 107.457 4.770 -999.990 -999.990 1.075 ..P WKT 2010 08 01 23 39 55 31.3200 -97.3300 251.000 457.0 93.990 4.820 -999.990 -999.990 0.940 ..P WKT 2010 08 01 23 44 55 31.3200 -97.3300 251.000 30.0 92.117 5.550 -999.990 -999.990 0.921 ..P WKT 2010 08 01 23 49 55 31.3200 -97.3300 251.000 122.0 97.927 5.400 -999.990 -999.990 0.979 ..P WKT 2010 08 02 00 09 55 31.3200 -97.3300 251.000 457.0 92.647 4.430 -999.990 -999.990 0.926 ..P WKT 2010 08 02 00 10 25 31.3200 -97.3300 251.000 457.0 95.683 4.360 -999.990 -999.990 0.957 ..P WKT 2010 08 02 00 10 55 31.3200 -97.3300 251.000 457.0 95.644 4.470 -999.990 -999.990 0.956 ..P WKT 2010 08 02 00 11 25 31.3200 -97.3300 251.000 457.0 95.606 4.520 -999.990 -999.990 0.956 ..P WKT 2010 08 02 00 11 55 31.3200 -97.3300 251.000 457.0 93.053 4.960 -999.990 -999.990 0.931 ..P WKT 2010 08 02 00 12 25 31.3200 -97.3300 251.000 457.0 87.985 5.610 -999.990 -999.990 0.880 ..P WKT 2010 08 02 00 12 55 31.3200 -97.3300 251.000 457.0 83.196 4.400 -999.990 -999.990 0.832 ..P WKT 2010 08 02 00 13 25 31.3200 -97.3300 251.000 457.0 83.438 4.400 -999.990 -999.990 0.834 ..P WKT 2010 08 02 00 13 55 31.3200 -97.3300 251.000 457.0 88.429 4.520 -999.990 -999.990 0.884 ..P WKT 2010 08 02 00 14 25 31.3200 -97.3300 251.000 457.0 81.405 4.400 -999.990 -999.990 0.814 ..P WKT 2010 08 02 00 14 55 31.3200 -97.3300 251.000 457.0 83.602 4.490 -999.990 -999.990 0.836 ..P WKT 2010 08 02 00 19 55 31.3200 -97.3300 251.000 30.0 90.203 4.400 -999.990 -999.990 0.902 ..P WKT 2010 08 02 00 24 55 31.3200 -97.3300 251.000 122.0 93.171 4.400 -999.990 -999.990 0.932 ..P WKT 2010 08 02 00 29 55 31.3200 -97.3300 251.000 457.0 87.201 4.580 -999.990 -999.990 0.872 ..P WKT 2010 08 02 00 34 55 31.3200 -97.3300 251.000 30.0 86.817 4.260 -999.990 -999.990 0.868 ..P WKT 2010 08 02 00 39 55 31.3200 -97.3300 251.000 122.0 90.064 4.290 -999.990 -999.990 0.901 ..P WKT 2010 08 02 00 44 55 31.3200 -97.3300 251.000 457.0 86.049 4.450 -999.990 -999.990 0.860 ..P WKT 2010 08 02 00 54 55 31.3200 -97.3300 251.000 30.0 87.609 4.260 -999.990 -999.990 0.876 ..P WKT 2010 08 02 00 59 55 31.3200 -97.3300 251.000 122.0 94.300 4.260 -999.990 -999.990 0.943 ..P WKT 2010 08 02 01 04 55 31.3200 -97.3300 251.000 457.0 82.839 4.400 -999.990 -999.990 0.828 ..P WKT 2010 08 02 01 09 55 31.3200 -97.3300 251.000 30.0 88.134 4.300 -999.990 -999.990 0.881 ..P WKT 2010 08 02 01 14 55 31.3200 -97.3300 251.000 122.0 88.680 5.440 -999.990 -999.990 0.887 ..P WKT 2010 08 02 01 19 55 31.3200 -97.3300 251.000 457.0 81.969 4.480 -999.990 -999.990 0.820 ..P WKT 2010 08 02 01 29 55 31.3200 -97.3300 251.000 30.0 93.153 4.440 -999.990 -999.990 0.932 ..P WKT 2010 08 02 01 34 55 31.3200 -97.3300 251.000 122.0 102.951 4.430 -999.990 -999.990 1.030 ..P WKT 2010 08 02 01 39 55 31.3200 -97.3300 251.000 457.0 85.952 4.390 -999.990 -999.990 0.860 ..P WKT 2010 08 02 01 44 55 31.3200 -97.3300 251.000 30.0 103.565 4.510 -999.990 -999.990 1.036 ..P WKT 2010 08 02 01 49 55 31.3200 -97.3300 251.000 122.0 92.429 4.740 -999.990 -999.990 0.924 ..P WKT 2010 08 02 01 54 55 31.3200 -97.3300 251.000 457.0 91.899 5.580 -999.990 -999.990 0.919 ..P WKT 2010 08 02 02 04 55 31.3200 -97.3300 251.000 30.0 102.938 5.150 -999.990 -999.990 1.029 ..P WKT 2010 08 02 02 09 55 31.3200 -97.3300 251.000 122.0 102.647 5.100 -999.990 -999.990 1.026 ..P WKT 2010 08 02 02 14 55 31.3200 -97.3300 251.000 457.0 95.241 4.880 -999.990 -999.990 0.952 ..P WKT 2010 08 02 02 19 55 31.3200 -97.3300 251.000 30.0 111.830 4.890 -999.990 -999.990 1.118 ..P WKT 2010 08 02 02 24 55 31.3200 -97.3300 251.000 122.0 95.356 5.050 -999.990 -999.990 0.954 ..P WKT 2010 08 02 02 29 55 31.3200 -97.3300 251.000 457.0 82.512 4.710 -999.990 -999.990 0.825 ..P WKT 2010 08 02 02 39 55 31.3200 -97.3300 251.000 30.0 102.075 4.700 -999.990 -999.990 1.021 ..P WKT 2010 08 02 02 44 55 31.3200 -97.3300 251.000 122.0 88.735 6.090 -999.990 -999.990 0.887 ..P WKT 2010 08 02 02 49 55 31.3200 -97.3300 251.000 457.0 90.597 5.240 -999.990 -999.990 0.906 ..P WKT 2010 08 02 02 54 55 31.3200 -97.3300 251.000 30.0 95.107 5.160 -999.990 -999.990 0.951 ..P WKT 2010 08 02 02 59 55 31.3200 -97.3300 251.000 122.0 81.351 4.900 -999.990 -999.990 0.814 ..P WKT 2010 08 02 03 04 55 31.3200 -97.3300 251.000 457.0 91.160 5.130 -999.990 -999.990 0.912 ..P WKT 2010 08 02 03 14 55 31.3200 -97.3300 251.000 30.0 85.102 4.360 -999.990 -999.990 0.851 ..P WKT 2010 08 02 03 19 55 31.3200 -97.3300 251.000 122.0 87.082 4.460 -999.990 -999.990 0.871 ..P WKT 2010 08 02 03 24 55 31.3200 -97.3300 251.000 457.0 93.384 4.420 -999.990 -999.990 0.934 ..P WKT 2010 08 02 03 29 55 31.3200 -97.3300 251.000 30.0 88.673 4.620 -999.990 -999.990 0.887 ..P WKT 2010 08 02 03 34 55 31.3200 -97.3300 251.000 122.0 93.440 4.830 -999.990 -999.990 0.934 ..P WKT 2010 08 02 03 39 55 31.3200 -97.3300 251.000 457.0 94.305 4.470 -999.990 -999.990 0.943 ..P WKT 2010 08 02 03 49 55 31.3200 -97.3300 251.000 30.0 92.330 4.670 -999.990 -999.990 0.923 ..P WKT 2010 08 02 03 54 55 31.3200 -97.3300 251.000 122.0 95.066 4.650 -999.990 -999.990 0.951 ..P WKT 2010 08 02 03 59 55 31.3200 -97.3300 251.000 457.0 91.670 4.880 -999.990 -999.990 0.917 ..P WKT 2010 08 02 04 04 55 31.3200 -97.3300 251.000 30.0 88.832 5.730 -999.990 -999.990 0.888 ..P WKT 2010 08 02 04 09 55 31.3200 -97.3300 251.000 122.0 89.757 5.360 -999.990 -999.990 0.898 ..P WKT 2010 08 02 04 14 55 31.3200 -97.3300 251.000 457.0 88.173 5.250 -999.990 -999.990 0.882 ..P WKT 2010 08 02 04 24 55 31.3200 -97.3300 251.000 30.0 92.747 5.360 -999.990 -999.990 0.927 ..P WKT 2010 08 02 04 29 55 31.3200 -97.3300 251.000 122.0 95.283 5.330 -999.990 -999.990 0.953 ..P WKT 2010 08 02 04 34 55 31.3200 -97.3300 251.000 457.0 92.247 4.950 -999.990 -999.990 0.922 ..P WKT 2010 08 02 04 39 55 31.3200 -97.3300 251.000 30.0 91.717 5.870 -999.990 -999.990 0.917 ..P WKT 2010 08 02 04 44 55 31.3200 -97.3300 251.000 122.0 83.111 4.980 -999.990 -999.990 0.831 ..P WKT 2010 08 02 04 49 55 31.3200 -97.3300 251.000 457.0 78.963 4.670 -999.990 -999.990 0.790 ..P WKT 2010 08 02 05 04 55 31.3200 -97.3300 251.000 30.0 86.070 5.100 -999.990 -999.990 0.861 ..P WKT 2010 08 02 05 09 55 31.3200 -97.3300 251.000 122.0 83.484 5.190 -999.990 -999.990 0.835 ..P WKT 2010 08 02 05 14 55 31.3200 -97.3300 251.000 457.0 71.430 5.190 -999.990 -999.990 0.714 ..P WKT 2010 08 02 05 19 55 31.3200 -97.3300 251.000 30.0 86.663 4.930 -999.990 -999.990 0.867 ..P WKT 2010 08 02 05 24 55 31.3200 -97.3300 251.000 122.0 87.974 5.330 -999.990 -999.990 0.880 ..P WKT 2010 08 02 05 29 55 31.3200 -97.3300 251.000 457.0 77.315 4.970 -999.990 -999.990 0.773 ..P WKT 2010 08 02 05 39 55 31.3200 -97.3300 251.000 30.0 81.359 5.910 -999.990 -999.990 0.814 ..P WKT 2010 08 02 05 44 55 31.3200 -97.3300 251.000 122.0 92.999 5.790 -999.990 -999.990 0.930 ..P WKT 2010 08 02 05 49 55 31.3200 -97.3300 251.000 457.0 80.980 5.160 -999.990 -999.990 0.810 ..P WKT 2010 08 02 05 54 55 31.3200 -97.3300 251.000 30.0 87.887 5.390 -999.990 -999.990 0.879 ..P WKT 2010 08 02 05 59 55 31.3200 -97.3300 251.000 122.0 88.949 4.990 -999.990 -999.990 0.889 ..P WKT 2010 08 02 06 04 55 31.3200 -97.3300 251.000 457.0 74.984 5.330 -999.990 -999.990 0.750 ..P WKT 2010 08 02 06 14 55 31.3200 -97.3300 251.000 30.0 83.330 5.370 -999.990 -999.990 0.833 ..P WKT 2010 08 02 06 19 55 31.3200 -97.3300 251.000 122.0 86.857 5.430 -999.990 -999.990 0.869 ..P WKT 2010 08 02 06 24 55 31.3200 -97.3300 251.000 457.0 86.209 4.790 -999.990 -999.990 0.862 ..P WKT 2010 08 02 06 29 55 31.3200 -97.3300 251.000 30.0 85.424 5.130 -999.990 -999.990 0.854 ..P WKT 2010 08 02 06 34 55 31.3200 -97.3300 251.000 122.0 92.427 4.860 -999.990 -999.990 0.924 ..P WKT 2010 08 02 06 39 55 31.3200 -97.3300 251.000 457.0 83.991 4.840 -999.990 -999.990 0.840 ..P WKT 2010 08 02 06 49 55 31.3200 -97.3300 251.000 30.0 97.021 4.800 -999.990 -999.990 0.970 ..P WKT 2010 08 02 06 54 55 31.3200 -97.3300 251.000 122.0 90.394 4.810 -999.990 -999.990 0.904 ..P WKT 2010 08 02 06 59 55 31.3200 -97.3300 251.000 457.0 92.249 5.530 -999.990 -999.990 0.922 ..P WKT 2010 08 02 07 04 55 31.3200 -97.3300 251.000 30.0 96.330 5.110 -999.990 -999.990 0.963 ..P WKT 2010 08 02 07 09 55 31.3200 -97.3300 251.000 122.0 94.570 4.930 -999.990 -999.990 0.946 ..P WKT 2010 08 02 07 14 55 31.3200 -97.3300 251.000 457.0 84.330 5.250 -999.990 -999.990 0.843 ..P WKT 2010 08 02 07 24 55 31.3200 -97.3300 251.000 30.0 91.755 5.330 -999.990 -999.990 0.918 ..P WKT 2010 08 02 07 29 55 31.3200 -97.3300 251.000 122.0 109.834 5.790 -999.990 -999.990 1.098 ..P WKT 2010 08 02 07 34 55 31.3200 -97.3300 251.000 457.0 80.652 5.520 -999.990 -999.990 0.807 ..P WKT 2010 08 02 07 39 55 31.3200 -97.3300 251.000 30.0 99.146 6.210 -999.990 -999.990 0.991 ..P WKT 2010 08 02 07 44 55 31.3200 -97.3300 251.000 122.0 113.608 5.820 -999.990 -999.990 1.136 ..P WKT 2010 08 02 07 49 55 31.3200 -97.3300 251.000 457.0 78.316 6.810 -999.990 -999.990 0.783 ..P WKT 2010 08 02 07 59 55 31.3200 -97.3300 251.000 30.0 98.464 5.860 -999.990 -999.990 0.985 ..P WKT 2010 08 02 08 04 55 31.3200 -97.3300 251.000 122.0 110.818 6.040 -999.990 -999.990 1.108 ..P WKT 2010 08 02 08 09 55 31.3200 -97.3300 251.000 457.0 84.129 5.750 -999.990 -999.990 0.841 ..P WKT 2010 08 02 08 14 55 31.3200 -97.3300 251.000 30.0 109.959 5.780 -999.990 -999.990 1.100 ..P WKT 2010 08 02 08 19 55 31.3200 -97.3300 251.000 122.0 96.054 5.390 -999.990 -999.990 0.961 ..P WKT 2010 08 02 08 24 55 31.3200 -97.3300 251.000 457.0 79.650 5.250 -999.990 -999.990 0.797 ..P WKT 2010 08 02 08 34 55 31.3200 -97.3300 251.000 30.0 107.488 5.240 -999.990 -999.990 1.075 ..P WKT 2010 08 02 08 39 55 31.3200 -97.3300 251.000 122.0 101.999 5.290 -999.990 -999.990 1.020 ..P WKT 2010 08 02 08 44 55 31.3200 -97.3300 251.000 457.0 81.234 5.240 -999.990 -999.990 0.812 ..P WKT 2010 08 02 08 49 55 31.3200 -97.3300 251.000 30.0 112.689 5.550 -999.990 -999.990 1.127 ..P WKT 2010 08 02 08 54 55 31.3200 -97.3300 251.000 122.0 101.646 6.180 -999.990 -999.990 1.016 ..P WKT 2010 08 02 08 59 55 31.3200 -97.3300 251.000 457.0 71.720 5.800 -999.990 -999.990 0.717 ..P WKT 2010 08 02 09 09 55 31.3200 -97.3300 251.000 30.0 105.457 5.630 -999.990 -999.990 1.055 ..P WKT 2010 08 02 09 14 55 31.3200 -97.3300 251.000 122.0 87.198 5.340 -999.990 -999.990 0.872 ..P WKT 2010 08 02 09 19 55 31.3200 -97.3300 251.000 457.0 70.329 5.130 -999.990 -999.990 0.703 ..P WKT 2010 08 02 09 24 55 31.3200 -97.3300 251.000 30.0 103.438 5.500 -999.990 -999.990 1.034 ..P WKT 2010 08 02 09 29 55 31.3200 -97.3300 251.000 122.0 94.621 5.370 -999.990 -999.990 0.946 ..P WKT 2010 08 02 09 34 55 31.3200 -97.3300 251.000 457.0 71.369 4.710 -999.990 -999.990 0.714 ..P WKT 2010 08 02 09 44 55 31.3200 -97.3300 251.000 30.0 104.895 5.040 -999.990 -999.990 1.049 ..P WKT 2010 08 02 09 49 55 31.3200 -97.3300 251.000 122.0 91.442 5.800 -999.990 -999.990 0.914 ..P WKT 2010 08 02 09 54 55 31.3200 -97.3300 251.000 457.0 81.459 5.640 -999.990 -999.990 0.815 ..P WKT 2010 08 02 09 59 55 31.3200 -97.3300 251.000 30.0 100.617 6.300 -999.990 -999.990 1.006 ..P WKT 2010 08 02 10 04 55 31.3200 -97.3300 251.000 122.0 90.496 5.140 -999.990 -999.990 0.905 ..P WKT 2010 08 02 10 09 55 31.3200 -97.3300 251.000 457.0 68.859 4.990 -999.990 -999.990 0.689 ..P WKT 2010 08 02 10 19 55 31.3200 -97.3300 251.000 30.0 94.306 5.240 -999.990 -999.990 0.943 ..P WKT 2010 08 02 10 24 55 31.3200 -97.3300 251.000 122.0 101.845 5.550 -999.990 -999.990 1.018 ..P WKT 2010 08 02 10 29 55 31.3200 -97.3300 251.000 457.0 71.514 5.560 -999.990 -999.990 0.715 ..P WKT 2010 08 02 10 34 55 31.3200 -97.3300 251.000 30.0 98.334 6.040 -999.990 -999.990 0.983 ..P WKT 2010 08 02 10 39 55 31.3200 -97.3300 251.000 122.0 92.278 5.830 -999.990 -999.990 0.923 ..P WKT 2010 08 02 10 44 55 31.3200 -97.3300 251.000 457.0 74.713 7.040 -999.990 -999.990 0.747 ..P WKT 2010 08 02 10 54 55 31.3200 -97.3300 251.000 30.0 98.920 7.120 -999.990 -999.990 0.989 ..P WKT 2010 08 02 10 59 55 31.3200 -97.3300 251.000 122.0 88.548 7.140 -999.990 -999.990 0.885 ..P WKT 2010 08 02 11 04 55 31.3200 -97.3300 251.000 457.0 73.323 5.870 -999.990 -999.990 0.733 ..P WKT 2010 08 02 11 09 55 31.3200 -97.3300 251.000 30.0 82.781 5.890 -999.990 -999.990 0.828 ..P WKT 2010 08 02 11 14 55 31.3200 -97.3300 251.000 122.0 94.040 5.840 -999.990 -999.990 0.940 ..P WKT 2010 08 02 11 19 55 31.3200 -97.3300 251.000 457.0 78.125 5.550 -999.990 -999.990 0.781 ..P WKT 2010 08 02 11 29 55 31.3200 -97.3300 251.000 30.0 98.468 5.540 -999.990 -999.990 0.985 ..P WKT 2010 08 02 11 34 55 31.3200 -97.3300 251.000 122.0 103.256 6.480 -999.990 -999.990 1.033 ..P WKT 2010 08 02 11 39 55 31.3200 -97.3300 251.000 457.0 79.629 5.650 -999.990 -999.990 0.796 ..P WKT 2010 08 02 11 44 55 31.3200 -97.3300 251.000 30.0 101.603 5.490 -999.990 -999.990 1.016 ..P WKT 2010 08 02 11 49 55 31.3200 -97.3300 251.000 122.0 100.154 5.370 -999.990 -999.990 1.002 ..P WKT 2010 08 02 12 09 55 31.3200 -97.3300 251.000 457.0 68.740 5.020 -999.990 -999.990 0.687 ..P WKT 2010 08 02 12 10 25 31.3200 -97.3300 251.000 457.0 67.553 4.940 -999.990 -999.990 0.676 ..P WKT 2010 08 02 12 10 55 31.3200 -97.3300 251.000 457.0 63.316 5.160 -999.990 -999.990 0.633 ..P WKT 2010 08 02 12 11 25 31.3200 -97.3300 251.000 457.0 65.455 5.630 -999.990 -999.990 0.655 ..P WKT 2010 08 02 12 11 55 31.3200 -97.3300 251.000 457.0 67.595 5.050 -999.990 -999.990 0.676 ..P WKT 2010 08 02 12 12 25 31.3200 -97.3300 251.000 457.0 69.179 5.460 -999.990 -999.990 0.692 ..P WKT 2010 08 02 12 12 55 31.3200 -97.3300 251.000 457.0 66.883 5.190 -999.990 -999.990 0.669 ..P WKT 2010 08 02 12 13 25 31.3200 -97.3300 251.000 457.0 69.854 5.110 -999.990 -999.990 0.699 ..P WKT 2010 08 02 12 13 55 31.3200 -97.3300 251.000 457.0 65.894 4.960 -999.990 -999.990 0.659 ..P WKT 2010 08 02 12 14 25 31.3200 -97.3300 251.000 457.0 66.925 5.250 -999.990 -999.990 0.669 ..P WKT 2010 08 02 12 14 55 31.3200 -97.3300 251.000 457.0 64.629 5.300 -999.990 -999.990 0.646 ..P WKT 2010 08 02 12 19 55 31.3200 -97.3300 251.000 30.0 91.015 5.400 -999.990 -999.990 0.910 ..P WKT 2010 08 02 12 24 55 31.3200 -97.3300 251.000 122.0 97.442 5.460 -999.990 -999.990 0.974 ..P WKT 2010 08 02 12 29 55 31.3200 -97.3300 251.000 457.0 72.256 5.880 -999.990 -999.990 0.723 ..P WKT 2010 08 02 12 34 55 31.3200 -97.3300 251.000 30.0 109.470 5.680 -999.990 -999.990 1.095 ..P WKT 2010 08 02 12 39 55 31.3200 -97.3300 251.000 122.0 88.162 5.880 -999.990 -999.990 0.882 ..P WKT 2010 08 02 12 44 55 31.3200 -97.3300 251.000 457.0 64.631 5.010 -999.990 -999.990 0.646 ..P WKT 2010 08 02 12 54 55 31.3200 -97.3300 251.000 30.0 94.702 5.190 -999.990 -999.990 0.947 ..P WKT 2010 08 02 12 59 55 31.3200 -97.3300 251.000 122.0 102.531 5.710 -999.990 -999.990 1.025 ..P WKT 2010 08 02 13 04 55 31.3200 -97.3300 251.000 457.0 65.954 7.200 -999.990 -999.990 0.660 ..P WKT 2010 08 02 13 09 55 31.3200 -97.3300 251.000 30.0 99.596 5.450 -999.990 -999.990 0.996 ..P WKT 2010 08 02 13 14 55 31.3200 -97.3300 251.000 122.0 90.494 5.050 -999.990 -999.990 0.905 ..P WKT 2010 08 02 13 19 55 31.3200 -97.3300 251.000 457.0 69.452 4.900 -999.990 -999.990 0.695 ..P WKT 2010 08 02 13 29 55 31.3200 -97.3300 251.000 30.0 106.955 5.020 -999.990 -999.990 1.070 ..P WKT 2010 08 02 13 34 55 31.3200 -97.3300 251.000 122.0 101.362 5.370 -999.990 -999.990 1.014 ..P WKT 2010 08 02 13 39 55 31.3200 -97.3300 251.000 457.0 72.989 5.470 -999.990 -999.990 0.730 ..P WKT 2010 08 02 13 44 55 31.3200 -97.3300 251.000 30.0 101.561 6.980 -999.990 -999.990 1.016 ..P WKT 2010 08 02 13 49 55 31.3200 -97.3300 251.000 122.0 106.522 6.080 -999.990 -999.990 1.065 ..P WKT 2010 08 02 13 54 55 31.3200 -97.3300 251.000 457.0 67.581 5.430 -999.990 -999.990 0.676 ..P WKT 2010 08 02 14 04 55 31.3200 -97.3300 251.000 30.0 91.794 5.560 -999.990 -999.990 0.918 ..P WKT 2010 08 02 14 09 55 31.3200 -97.3300 251.000 122.0 102.713 6.070 -999.990 -999.990 1.027 ..P WKT 2010 08 02 14 14 55 31.3200 -97.3300 251.000 457.0 76.938 5.490 -999.990 -999.990 0.769 ..P WKT 2010 08 02 14 19 55 31.3200 -97.3300 251.000 30.0 98.007 5.500 -999.990 -999.990 0.980 ..P WKT 2010 08 02 14 24 55 31.3200 -97.3300 251.000 122.0 102.118 5.510 -999.990 -999.990 1.021 ..P WKT 2010 08 02 14 29 55 31.3200 -97.3300 251.000 457.0 81.062 5.290 -999.990 -999.990 0.811 ..P WKT 2010 08 02 14 39 55 31.3200 -97.3300 251.000 30.0 98.026 5.400 -999.990 -999.990 0.980 ..P WKT 2010 08 02 14 44 55 31.3200 -97.3300 251.000 122.0 104.622 5.100 -999.990 -999.990 1.046 ..P WKT 2010 08 02 14 49 55 31.3200 -97.3300 251.000 457.0 82.008 4.990 -999.990 -999.990 0.820 ..P WKT 2010 08 02 14 54 55 31.3200 -97.3300 251.000 30.0 101.682 4.890 -999.990 -999.990 1.017 ..P WKT 2010 08 02 14 59 55 31.3200 -97.3300 251.000 122.0 116.909 5.240 -999.990 -999.990 1.169 ..P WKT 2010 08 02 15 04 55 31.3200 -97.3300 251.000 457.0 81.346 5.140 -999.990 -999.990 0.813 ..P WKT 2010 08 02 15 14 55 31.3200 -97.3300 251.000 30.0 99.019 5.320 -999.990 -999.990 0.990 ..P WKT 2010 08 02 15 19 55 31.3200 -97.3300 251.000 122.0 106.198 4.930 -999.990 -999.990 1.062 ..P WKT 2010 08 02 15 24 55 31.3200 -97.3300 251.000 457.0 75.927 5.090 -999.990 -999.990 0.759 ..P WKT 2010 08 02 15 29 55 31.3200 -97.3300 251.000 30.0 105.384 4.850 -999.990 -999.990 1.054 ..P WKT 2010 08 02 15 34 55 31.3200 -97.3300 251.000 122.0 104.071 4.620 -999.990 -999.990 1.041 ..P WKT 2010 08 02 15 39 55 31.3200 -97.3300 251.000 457.0 74.765 5.180 -999.990 -999.990 0.748 ..P WKT 2010 08 02 15 49 55 31.3200 -97.3300 251.000 30.0 97.108 5.040 -999.990 -999.990 0.971 ..P WKT 2010 08 02 15 54 55 31.3200 -97.3300 251.000 122.0 108.512 4.980 -999.990 -999.990 1.085 ..P WKT 2010 08 02 15 59 55 31.3200 -97.3300 251.000 457.0 87.174 5.290 -999.990 -999.990 0.872 ..P WKT 2010 08 02 16 04 55 31.3200 -97.3300 251.000 30.0 104.850 5.380 -999.990 -999.990 1.048 ..P WKT 2010 08 02 16 09 55 31.3200 -97.3300 251.000 122.0 109.987 4.920 -999.990 -999.990 1.100 ..P WKT 2010 08 02 16 14 55 31.3200 -97.3300 251.000 457.0 95.612 5.390 -999.990 -999.990 0.956 ..P WKT 2010 08 02 16 24 55 31.3200 -97.3300 251.000 30.0 105.270 5.020 -999.990 -999.990 1.053 ..P WKT 2010 08 02 16 29 55 31.3200 -97.3300 251.000 122.0 110.350 4.900 -999.990 -999.990 1.103 ..P WKT 2010 08 02 16 34 55 31.3200 -97.3300 251.000 457.0 102.881 4.760 -999.990 -999.990 1.029 ..P WKT 2010 08 02 16 39 55 31.3200 -97.3300 251.000 30.0 102.383 4.990 -999.990 -999.990 1.024 ..P WKT 2010 08 02 16 44 55 31.3200 -97.3300 251.000 122.0 109.696 4.840 -999.990 -999.990 1.097 ..P WKT 2010 08 02 16 49 55 31.3200 -97.3300 251.000 457.0 86.880 5.630 -999.990 -999.990 0.869 ..P WKT 2010 08 02 17 04 55 31.3200 -97.3300 251.000 30.0 87.184 5.050 -999.990 -999.990 0.872 ..P WKT 2010 08 02 17 09 55 31.3200 -97.3300 251.000 122.0 98.332 6.010 -999.990 -999.990 0.983 ..P WKT 2010 08 02 17 14 55 31.3200 -97.3300 251.000 457.0 87.430 5.300 -999.990 -999.990 0.874 ..P WKT 2010 08 02 17 19 55 31.3200 -97.3300 251.000 30.0 91.323 4.630 -999.990 -999.990 0.913 ..P WKT 2010 08 02 17 24 55 31.3200 -97.3300 251.000 122.0 98.008 4.580 -999.990 -999.990 0.980 ..P WKT 2010 08 02 17 29 55 31.3200 -97.3300 251.000 457.0 92.408 4.620 -999.990 -999.990 0.924 ..P WKT 2010 08 02 17 39 55 31.3200 -97.3300 251.000 30.0 90.735 4.490 -999.990 -999.990 0.907 ..P WKT 2010 08 02 17 44 55 31.3200 -97.3300 251.000 122.0 108.073 4.700 -999.990 -999.990 1.081 ..P WKT 2010 08 02 17 49 55 31.3200 -97.3300 251.000 457.0 98.316 6.040 -999.990 -999.990 0.983 ..P WKT 2010 08 02 17 54 55 31.3200 -97.3300 251.000 30.0 100.431 6.750 -999.990 -999.990 1.004 ..P WKT 2010 08 02 17 59 55 31.3200 -97.3300 251.000 122.0 113.306 6.090 -999.990 -999.990 1.133 ..P WKT 2010 08 02 18 04 55 31.3200 -97.3300 251.000 457.0 108.996 4.970 -999.990 -999.990 1.090 ..P WKT 2010 08 02 18 14 55 31.3200 -97.3300 251.000 30.0 108.698 5.090 -999.990 -999.990 1.087 ..P WKT 2010 08 02 18 19 55 31.3200 -97.3300 251.000 122.0 112.714 6.140 -999.990 -999.990 1.127 ..P WKT 2010 08 02 18 24 55 31.3200 -97.3300 251.000 457.0 109.599 6.960 -999.990 -999.990 1.096 ..P WKT 2010 08 02 18 29 55 31.3200 -97.3300 251.000 30.0 100.472 6.280 -999.990 -999.990 1.005 ..P WKT 2010 08 02 18 34 55 31.3200 -97.3300 251.000 122.0 113.577 5.350 -999.990 -999.990 1.136 ..P WKT 2010 08 02 18 39 55 31.3200 -97.3300 251.000 457.0 99.833 5.280 -999.990 -999.990 0.998 ..P WKT 2010 08 02 18 49 55 31.3200 -97.3300 251.000 30.0 93.059 5.310 -999.990 -999.990 0.931 ..P WKT 2010 08 02 18 54 55 31.3200 -97.3300 251.000 122.0 105.069 5.010 -999.990 -999.990 1.051 ..P WKT 2010 08 02 18 59 55 31.3200 -97.3300 251.000 457.0 96.095 5.750 -999.990 -999.990 0.961 ..P WKT 2010 08 02 19 04 55 31.3200 -97.3300 251.000 30.0 94.955 5.630 -999.990 -999.990 0.950 ..P WKT 2010 08 02 19 09 55 31.3200 -97.3300 251.000 122.0 103.052 5.280 -999.990 -999.990 1.031 ..P WKT 2010 08 02 19 14 55 31.3200 -97.3300 251.000 457.0 90.855 5.300 -999.990 -999.990 0.909 ..P WKT 2010 08 02 19 24 55 31.3200 -97.3300 251.000 30.0 93.912 4.700 -999.990 -999.990 0.939 ..P WKT 2010 08 02 19 29 55 31.3200 -97.3300 251.000 122.0 105.393 5.010 -999.990 -999.990 1.054 ..P WKT 2010 08 02 19 34 55 31.3200 -97.3300 251.000 457.0 100.212 6.430 -999.990 -999.990 1.002 ..P WKT 2010 08 02 19 39 55 31.3200 -97.3300 251.000 30.0 98.392 5.210 -999.990 -999.990 0.984 ..P WKT 2010 08 02 19 44 55 31.3200 -97.3300 251.000 122.0 117.301 5.290 -999.990 -999.990 1.173 ..P WKT 2010 08 02 19 49 55 31.3200 -97.3300 251.000 457.0 104.555 4.340 -999.990 -999.990 1.046 ..P WKT 2010 08 02 19 59 55 31.3200 -97.3300 251.000 30.0 113.643 4.480 -999.990 -999.990 1.136 ..P WKT 2010 08 02 20 04 55 31.3200 -97.3300 251.000 122.0 125.116 5.160 -999.990 -999.990 1.251 ..P WKT 2010 08 02 20 09 55 31.3200 -97.3300 251.000 457.0 114.728 5.160 -999.990 -999.990 1.147 ..P WKT 2010 08 02 20 14 55 31.3200 -97.3300 251.000 30.0 107.982 4.980 -999.990 -999.990 1.080 ..P WKT 2010 08 02 20 19 55 31.3200 -97.3300 251.000 122.0 121.420 5.430 -999.990 -999.990 1.214 ..P WKT 2010 08 02 20 24 55 31.3200 -97.3300 251.000 457.0 112.149 4.400 -999.990 -999.990 1.121 ..P WKT 2010 08 02 20 34 55 31.3200 -97.3300 251.000 30.0 115.718 4.790 -999.990 -999.990 1.157 ..P WKT 2010 08 02 20 39 55 31.3200 -97.3300 251.000 122.0 117.063 4.520 -999.990 -999.990 1.171 ..P WKT 2010 08 02 20 44 55 31.3200 -97.3300 251.000 457.0 113.077 4.430 -999.990 -999.990 1.131 ..P WKT 2010 08 02 20 49 55 31.3200 -97.3300 251.000 30.0 113.018 5.000 -999.990 -999.990 1.130 ..P WKT 2010 08 02 20 54 55 31.3200 -97.3300 251.000 122.0 119.414 6.010 -999.990 -999.990 1.194 ..P WKT 2010 08 02 20 59 55 31.3200 -97.3300 251.000 457.0 110.096 4.360 -999.990 -999.990 1.101 ..P WKT 2010 08 02 21 09 55 31.3200 -97.3300 251.000 30.0 107.451 4.670 -999.990 -999.990 1.075 ..P WKT 2010 08 02 21 14 55 31.3200 -97.3300 251.000 122.0 110.760 5.220 -999.990 -999.990 1.108 ..P WKT 2010 08 02 21 19 55 31.3200 -97.3300 251.000 457.0 106.491 4.720 -999.990 -999.990 1.065 ..P WKT 2010 08 02 21 24 55 31.3200 -97.3300 251.000 30.0 108.958 4.680 -999.990 -999.990 1.090 ..P WKT 2010 08 02 21 29 55 31.3200 -97.3300 251.000 122.0 122.097 4.840 -999.990 -999.990 1.221 ..P WKT 2010 08 02 21 34 55 31.3200 -97.3300 251.000 457.0 116.704 4.760 -999.990 -999.990 1.167 ..P WKT 2010 08 02 21 44 55 31.3200 -97.3300 251.000 30.0 115.042 4.800 -999.990 -999.990 1.150 ..P WKT 2010 08 02 21 49 55 31.3200 -97.3300 251.000 122.0 121.445 4.650 -999.990 -999.990 1.214 ..P WKT 2010 08 02 21 54 55 31.3200 -97.3300 251.000 457.0 117.173 4.590 -999.990 -999.990 1.172 ..P WKT 2010 08 02 21 59 55 31.3200 -97.3300 251.000 30.0 105.172 4.520 -999.990 -999.990 1.052 ..P WKT 2010 08 02 22 04 55 31.3200 -97.3300 251.000 122.0 124.504 5.180 -999.990 -999.990 1.245 ..P WKT 2010 08 02 22 09 55 31.3200 -97.3300 251.000 457.0 111.236 4.640 -999.990 -999.990 1.112 ..P WKT 2010 08 02 22 19 55 31.3200 -97.3300 251.000 30.0 108.990 4.650 -999.990 -999.990 1.090 ..P WKT 2010 08 02 22 24 55 31.3200 -97.3300 251.000 122.0 121.001 5.010 -999.990 -999.990 1.210 ..P WKT 2010 08 02 22 29 55 31.3200 -97.3300 251.000 457.0 110.378 5.070 -999.990 -999.990 1.104 ..P WKT 2010 08 02 22 34 55 31.3200 -97.3300 251.000 30.0 110.017 5.670 -999.990 -999.990 1.100 ..P WKT 2010 08 02 22 39 55 31.3200 -97.3300 251.000 122.0 118.376 4.310 -999.990 -999.990 1.184 ..P WKT 2010 08 02 22 44 55 31.3200 -97.3300 251.000 457.0 115.204 4.280 -999.990 -999.990 1.152 ..P WKT 2010 08 02 22 54 55 31.3200 -97.3300 251.000 30.0 107.932 5.480 -999.990 -999.990 1.079 ..P WKT 2010 08 02 22 59 55 31.3200 -97.3300 251.000 122.0 126.485 4.100 -999.990 -999.990 1.265 ..P WKT 2010 08 02 23 04 55 31.3200 -97.3300 251.000 457.0 114.930 5.400 -999.990 -999.990 1.149 ..P WKT 2010 08 02 23 09 55 31.3200 -97.3300 251.000 30.0 113.504 6.290 -999.990 -999.990 1.135 ..P WKT 2010 08 02 23 14 55 31.3200 -97.3300 251.000 122.0 125.871 5.540 -999.990 -999.990 1.259 ..P WKT 2010 08 02 23 19 55 31.3200 -97.3300 251.000 457.0 121.631 4.480 -999.990 -999.990 1.216 ..P WKT 2010 08 02 23 29 55 31.3200 -97.3300 251.000 30.0 112.766 5.100 -999.990 -999.990 1.128 ..P WKT 2010 08 02 23 34 55 31.3200 -97.3300 251.000 122.0 128.418 5.030 -999.990 -999.990 1.284 ..P WKT 2010 08 02 23 39 55 31.3200 -97.3300 251.000 457.0 111.119 5.820 -999.990 -999.990 1.111 ..P WKT 2010 08 02 23 44 55 31.3200 -97.3300 251.000 30.0 110.155 5.770 -999.990 -999.990 1.102 ..P WKT 2010 08 02 23 49 55 31.3200 -97.3300 251.000 122.0 112.007 5.320 -999.990 -999.990 1.120 ..P WKT 2010 08 03 00 09 55 31.3200 -97.3300 251.000 457.0 104.864 4.850 -999.990 -999.990 1.049 ..P WKT 2010 08 03 00 10 25 31.3200 -97.3300 251.000 457.0 108.584 4.920 -999.990 -999.990 1.086 ..P WKT 2010 08 03 00 10 55 31.3200 -97.3300 251.000 457.0 107.235 4.970 -999.990 -999.990 1.072 ..P WKT 2010 08 03 00 11 25 31.3200 -97.3300 251.000 457.0 107.858 4.850 -999.990 -999.990 1.079 ..P WKT 2010 08 03 00 11 55 31.3200 -97.3300 251.000 457.0 107.072 5.030 -999.990 -999.990 1.071 ..P WKT 2010 08 03 00 12 25 31.3200 -97.3300 251.000 457.0 107.413 4.890 -999.990 -999.990 1.074 ..P WKT 2010 08 03 00 12 55 31.3200 -97.3300 251.000 457.0 102.122 4.810 -999.990 -999.990 1.021 ..P WKT 2010 08 03 00 13 25 31.3200 -97.3300 251.000 457.0 110.911 5.340 -999.990 -999.990 1.109 ..P WKT 2010 08 03 00 13 55 31.3200 -97.3300 251.000 457.0 109.844 4.800 -999.990 -999.990 1.098 ..P WKT 2010 08 03 00 14 25 31.3200 -97.3300 251.000 457.0 107.087 4.750 -999.990 -999.990 1.071 ..P WKT 2010 08 03 00 14 55 31.3200 -97.3300 251.000 457.0 105.175 4.930 -999.990 -999.990 1.052 ..P WKT 2010 08 03 00 19 55 31.3200 -97.3300 251.000 30.0 105.205 5.190 -999.990 -999.990 1.052 ..P WKT 2010 08 03 00 24 55 31.3200 -97.3300 251.000 122.0 113.959 5.650 -999.990 -999.990 1.140 ..P WKT 2010 08 03 00 29 55 31.3200 -97.3300 251.000 457.0 109.485 4.830 -999.990 -999.990 1.095 ..P WKT 2010 08 03 00 34 55 31.3200 -97.3300 251.000 30.0 114.578 4.460 -999.990 -999.990 1.146 ..P WKT 2010 08 03 00 39 55 31.3200 -97.3300 251.000 122.0 118.824 4.830 -999.990 -999.990 1.188 ..P WKT 2010 08 03 00 44 55 31.3200 -97.3300 251.000 457.0 116.038 4.130 -999.990 -999.990 1.160 ..P WKT 2010 08 03 00 54 55 31.3200 -97.3300 251.000 30.0 112.090 5.200 -999.990 -999.990 1.121 ..P WKT 2010 08 03 00 59 55 31.3200 -97.3300 251.000 122.0 114.300 4.820 -999.990 -999.990 1.143 ..P WKT 2010 08 03 01 04 55 31.3200 -97.3300 251.000 457.0 100.495 4.710 -999.990 -999.990 1.005 ..P WKT 2010 08 03 01 09 55 31.3200 -97.3300 251.000 30.0 110.008 4.140 -999.990 -999.990 1.100 ..P WKT 2010 08 03 01 14 55 31.3200 -97.3300 251.000 122.0 109.128 4.140 -999.990 -999.990 1.091 ..P WKT 2010 08 03 01 19 55 31.3200 -97.3300 251.000 457.0 109.931 4.700 -999.990 -999.990 1.099 ..P WKT 2010 08 03 01 29 55 31.3200 -97.3300 251.000 30.0 105.325 4.080 -999.990 -999.990 1.053 ..P WKT 2010 08 03 01 34 55 31.3200 -97.3300 251.000 122.0 117.731 4.450 -999.990 -999.990 1.177 ..P WKT 2010 08 03 01 39 55 31.3200 -97.3300 251.000 457.0 103.207 4.120 -999.990 -999.990 1.032 ..P WKT 2010 08 03 01 44 55 31.3200 -97.3300 251.000 30.0 106.355 5.050 -999.990 -999.990 1.064 ..P WKT 2010 08 03 01 49 55 31.3200 -97.3300 251.000 122.0 115.108 4.600 -999.990 -999.990 1.151 ..P WKT 2010 08 03 01 54 55 31.3200 -97.3300 251.000 457.0 104.658 4.030 -999.990 -999.990 1.047 ..P WKT 2010 08 03 02 04 55 31.3200 -97.3300 251.000 30.0 110.448 5.230 -999.990 -999.990 1.104 ..P WKT 2010 08 03 02 09 55 31.3200 -97.3300 251.000 122.0 111.409 4.690 -999.990 -999.990 1.114 ..P WKT 2010 08 03 02 14 55 31.3200 -97.3300 251.000 457.0 106.210 4.400 -999.990 -999.990 1.062 ..P WKT 2010 08 03 02 19 55 31.3200 -97.3300 251.000 30.0 120.470 4.350 -999.990 -999.990 1.205 ..P WKT 2010 08 03 02 24 55 31.3200 -97.3300 251.000 122.0 113.312 4.510 -999.990 -999.990 1.133 ..P WKT 2010 08 03 02 29 55 31.3200 -97.3300 251.000 457.0 113.013 5.370 -999.990 -999.990 1.130 ..P WKT 2010 08 03 02 39 55 31.3200 -97.3300 251.000 30.0 113.674 4.530 -999.990 -999.990 1.137 ..P WKT 2010 08 03 02 44 55 31.3200 -97.3300 251.000 122.0 115.332 4.340 -999.990 -999.990 1.153 ..P WKT 2010 08 03 02 49 55 31.3200 -97.3300 251.000 457.0 107.626 4.710 -999.990 -999.990 1.076 ..P WKT 2010 08 03 02 54 55 31.3200 -97.3300 251.000 30.0 118.787 3.980 -999.990 -999.990 1.188 ..P WKT 2010 08 03 02 59 55 31.3200 -97.3300 251.000 122.0 113.738 3.940 -999.990 -999.990 1.137 ..P WKT 2010 08 03 03 04 55 31.3200 -97.3300 251.000 457.0 107.294 4.230 -999.990 -999.990 1.073 ..P WKT 2010 08 03 03 14 55 31.3200 -97.3300 251.000 30.0 108.256 5.120 -999.990 -999.990 1.083 ..P WKT 2010 08 03 03 19 55 31.3200 -97.3300 251.000 122.0 134.915 3.760 -999.990 -999.990 1.349 ..P WKT 2010 08 03 03 24 55 31.3200 -97.3300 251.000 457.0 148.166 4.150 -999.990 -999.990 1.482 ..P WKT 2010 08 03 03 29 55 31.3200 -97.3300 251.000 30.0 115.935 4.190 -999.990 -999.990 1.159 ..P WKT 2010 08 03 03 34 55 31.3200 -97.3300 251.000 122.0 122.211 5.260 -999.990 -999.990 1.222 ..P WKT 2010 08 03 03 39 55 31.3200 -97.3300 251.000 457.0 132.110 4.120 -999.990 -999.990 1.321 ..P WKT 2010 08 03 03 49 55 31.3200 -97.3300 251.000 30.0 131.107 4.320 -999.990 -999.990 1.311 ..P WKT 2010 08 03 03 54 55 31.3200 -97.3300 251.000 122.0 133.871 4.660 -999.990 -999.990 1.339 ..P WKT 2010 08 03 03 59 55 31.3200 -97.3300 251.000 457.0 125.767 3.890 -999.990 -999.990 1.258 ..P WKT 2010 08 03 04 04 55 31.3200 -97.3300 251.000 30.0 139.951 6.090 -999.990 -999.990 1.400 ..P WKT 2010 08 03 04 09 55 31.3200 -97.3300 251.000 122.0 116.813 3.890 -999.990 -999.990 1.168 ..P WKT 2010 08 03 04 14 55 31.3200 -97.3300 251.000 457.0 135.168 3.720 -999.990 -999.990 1.352 ..P WKT 2010 08 03 04 24 55 31.3200 -97.3300 251.000 30.0 135.398 3.650 -999.990 -999.990 1.354 ..P WKT 2010 08 03 04 29 55 31.3200 -97.3300 251.000 122.0 121.464 4.000 -999.990 -999.990 1.215 ..P WKT 2010 08 03 04 34 55 31.3200 -97.3300 251.000 457.0 114.489 5.420 -999.990 -999.990 1.145 ..P WKT 2010 08 03 04 39 55 31.3200 -97.3300 251.000 30.0 122.256 6.290 -999.990 -999.990 1.223 ..P WKT 2010 08 03 04 44 55 31.3200 -97.3300 251.000 122.0 106.666 5.760 -999.990 -999.990 1.067 ..P WKT 2010 08 03 04 49 55 31.3200 -97.3300 251.000 457.0 109.428 5.630 -999.990 -999.990 1.094 ..P WKT 2010 08 03 05 04 55 31.3200 -97.3300 251.000 30.0 117.290 5.310 -999.990 -999.990 1.173 ..P WKT 2010 08 03 05 09 55 31.3200 -97.3300 251.000 122.0 105.538 6.390 -999.990 -999.990 1.055 ..P WKT 2010 08 03 05 14 55 31.3200 -97.3300 251.000 457.0 105.868 6.610 -999.990 -999.990 1.059 ..P WKT 2010 08 03 05 19 55 31.3200 -97.3300 251.000 30.0 111.749 4.460 -999.990 -999.990 1.117 ..P WKT 2010 08 03 05 24 55 31.3200 -97.3300 251.000 122.0 107.083 4.370 -999.990 -999.990 1.071 ..P WKT 2010 08 03 05 29 55 31.3200 -97.3300 251.000 457.0 109.909 4.780 -999.990 -999.990 1.099 ..P WKT 2010 08 03 05 39 55 31.3200 -97.3300 251.000 30.0 112.121 4.760 -999.990 -999.990 1.121 ..P WKT 2010 08 03 05 44 55 31.3200 -97.3300 251.000 122.0 111.508 4.530 -999.990 -999.990 1.115 ..P WKT 2010 08 03 05 49 55 31.3200 -97.3300 251.000 457.0 117.270 4.600 -999.990 -999.990 1.173 ..P WKT 2010 08 03 05 54 55 31.3200 -97.3300 251.000 30.0 111.946 3.880 -999.990 -999.990 1.119 ..P WKT 2010 08 03 05 59 55 31.3200 -97.3300 251.000 122.0 111.334 3.710 -999.990 -999.990 1.113 ..P WKT 2010 08 03 06 04 55 31.3200 -97.3300 251.000 457.0 115.430 3.510 -999.990 -999.990 1.154 ..P WKT 2010 08 03 06 14 55 31.3200 -97.3300 251.000 30.0 110.726 3.440 -999.990 -999.990 1.107 ..P WKT 2010 08 03 06 19 55 31.3200 -97.3300 251.000 122.0 104.559 3.340 -999.990 -999.990 1.046 ..P WKT 2010 08 03 06 24 55 31.3200 -97.3300 251.000 457.0 119.563 5.100 -999.990 -999.990 1.196 ..P WKT 2010 08 03 06 29 55 31.3200 -97.3300 251.000 30.0 105.375 4.230 -999.990 -999.990 1.054 ..P WKT 2010 08 03 06 34 55 31.3200 -97.3300 251.000 122.0 113.181 4.150 -999.990 -999.990 1.132 ..P WKT 2010 08 03 06 39 55 31.3200 -97.3300 251.000 457.0 114.347 4.000 -999.990 -999.990 1.143 ..P WKT 2010 08 03 06 49 55 31.3200 -97.3300 251.000 30.0 108.406 3.970 -999.990 -999.990 1.084 ..P WKT 2010 08 03 06 54 55 31.3200 -97.3300 251.000 122.0 114.152 3.870 -999.990 -999.990 1.142 ..P WKT 2010 08 03 06 59 55 31.3200 -97.3300 251.000 457.0 101.386 3.740 -999.990 -999.990 1.014 ..P WKT 2010 08 03 07 04 55 31.3200 -97.3300 251.000 30.0 110.721 3.820 -999.990 -999.990 1.107 ..P WKT 2010 08 03 07 09 55 31.3200 -97.3300 251.000 122.0 108.730 4.120 -999.990 -999.990 1.087 ..P WKT 2010 08 03 07 14 55 31.3200 -97.3300 251.000 457.0 98.736 4.300 -999.990 -999.990 0.987 ..P WKT 2010 08 03 07 24 55 31.3200 -97.3300 251.000 30.0 114.039 5.780 -999.990 -999.990 1.140 ..P WKT 2010 08 03 07 29 55 31.3200 -97.3300 251.000 122.0 110.079 4.450 -999.990 -999.990 1.101 ..P WKT 2010 08 03 07 34 55 31.3200 -97.3300 251.000 457.0 99.226 4.410 -999.990 -999.990 0.992 ..P WKT 2010 08 03 07 39 55 31.3200 -97.3300 251.000 30.0 111.539 4.720 -999.990 -999.990 1.115 ..P WKT 2010 08 03 07 44 55 31.3200 -97.3300 251.000 122.0 111.994 4.820 -999.990 -999.990 1.120 ..P WKT 2010 08 03 07 49 55 31.3200 -97.3300 251.000 457.0 96.463 5.710 -999.990 -999.990 0.965 ..P WKT 2010 08 03 07 59 55 31.3200 -97.3300 251.000 30.0 111.033 4.990 -999.990 -999.990 1.110 ..P WKT 2010 08 03 08 04 55 31.3200 -97.3300 251.000 122.0 119.356 4.430 -999.990 -999.990 1.194 ..P WKT 2010 08 03 08 09 55 31.3200 -97.3300 251.000 457.0 100.416 4.540 -999.990 -999.990 1.004 ..P WKT 2010 08 03 08 14 55 31.3200 -97.3300 251.000 30.0 112.591 3.980 -999.990 -999.990 1.126 ..P WKT 2010 08 03 08 19 55 31.3200 -97.3300 251.000 122.0 133.567 3.780 -999.990 -999.990 1.336 ..P WKT 2010 08 03 08 24 55 31.3200 -97.3300 251.000 457.0 93.450 3.900 -999.990 -999.990 0.934 ..P WKT 2010 08 03 08 34 55 31.3200 -97.3300 251.000 30.0 119.275 3.530 -999.990 -999.990 1.193 ..P WKT 2010 08 03 08 39 55 31.3200 -97.3300 251.000 122.0 112.027 3.630 -999.990 -999.990 1.120 ..P WKT 2010 08 03 08 44 55 31.3200 -97.3300 251.000 457.0 93.650 4.380 -999.990 -999.990 0.937 ..P WKT 2010 08 03 08 49 55 31.3200 -97.3300 251.000 30.0 123.101 5.350 -999.990 -999.990 1.231 ..P WKT 2010 08 03 08 54 55 31.3200 -97.3300 251.000 122.0 113.934 5.270 -999.990 -999.990 1.139 ..P WKT 2010 08 03 08 59 55 31.3200 -97.3300 251.000 457.0 101.888 4.270 -999.990 -999.990 1.019 ..P WKT 2010 08 03 09 09 55 31.3200 -97.3300 251.000 30.0 116.466 3.550 -999.990 -999.990 1.165 ..P WKT 2010 08 03 09 14 55 31.3200 -97.3300 251.000 122.0 114.114 5.130 -999.990 -999.990 1.141 ..P WKT 2010 08 03 09 19 55 31.3200 -97.3300 251.000 457.0 97.903 4.830 -999.990 -999.990 0.979 ..P WKT 2010 08 03 09 24 55 31.3200 -97.3300 251.000 30.0 110.784 4.550 -999.990 -999.990 1.108 ..P WKT 2010 08 03 09 29 55 31.3200 -97.3300 251.000 122.0 104.868 4.500 -999.990 -999.990 1.049 ..P WKT 2010 08 03 09 34 55 31.3200 -97.3300 251.000 457.0 97.857 4.540 -999.990 -999.990 0.979 ..P WKT 2010 08 03 09 44 55 31.3200 -97.3300 251.000 30.0 105.796 4.270 -999.990 -999.990 1.058 ..P WKT 2010 08 03 09 49 55 31.3200 -97.3300 251.000 122.0 107.307 4.310 -999.990 -999.990 1.073 ..P WKT 2010 08 03 09 54 55 31.3200 -97.3300 251.000 457.0 93.199 4.550 -999.990 -999.990 0.932 ..P WKT 2010 08 03 09 59 55 31.3200 -97.3300 251.000 30.0 109.914 3.720 -999.990 -999.990 1.099 ..P WKT 2010 08 03 10 04 55 31.3200 -97.3300 251.000 122.0 102.932 3.990 -999.990 -999.990 1.029 ..P WKT 2010 08 03 10 09 55 31.3200 -97.3300 251.000 457.0 94.859 3.420 -999.990 -999.990 0.949 ..P WKT 2010 08 03 10 19 55 31.3200 -97.3300 251.000 30.0 116.098 4.220 -999.990 -999.990 1.161 ..P WKT 2010 08 03 10 24 55 31.3200 -97.3300 251.000 122.0 104.763 3.510 -999.990 -999.990 1.048 ..P WKT 2010 08 03 10 29 55 31.3200 -97.3300 251.000 457.0 95.485 3.600 -999.990 -999.990 0.955 ..P WKT 2010 08 03 10 34 55 31.3200 -97.3300 251.000 30.0 109.868 3.740 -999.990 -999.990 1.099 ..P WKT 2010 08 03 10 39 55 31.3200 -97.3300 251.000 122.0 102.096 3.820 -999.990 -999.990 1.021 ..P WKT 2010 08 03 10 44 55 31.3200 -97.3300 251.000 457.0 94.329 3.270 -999.990 -999.990 0.943 ..P WKT 2010 08 03 10 54 55 31.3200 -97.3300 251.000 30.0 106.146 3.360 -999.990 -999.990 1.061 ..P WKT 2010 08 03 10 59 55 31.3200 -97.3300 251.000 122.0 96.218 3.590 -999.990 -999.990 0.962 ..P WKT 2010 08 03 11 04 55 31.3200 -97.3300 251.000 457.0 89.571 3.350 -999.990 -999.990 0.896 ..P WKT 2010 08 03 11 09 55 31.3200 -97.3300 251.000 30.0 110.504 3.360 -999.990 -999.990 1.105 ..P WKT 2010 08 03 11 14 55 31.3200 -97.3300 251.000 122.0 91.846 3.480 -999.990 -999.990 0.918 ..P WKT 2010 08 03 11 19 55 31.3200 -97.3300 251.000 457.0 90.389 4.950 -999.990 -999.990 0.904 ..P WKT 2010 08 03 11 29 55 31.3200 -97.3300 251.000 30.0 112.756 4.580 -999.990 -999.990 1.128 ..P WKT 2010 08 03 11 34 55 31.3200 -97.3300 251.000 122.0 95.658 3.830 -999.990 -999.990 0.957 ..P WKT 2010 08 03 11 39 55 31.3200 -97.3300 251.000 457.0 98.472 3.530 -999.990 -999.990 0.985 ..P WKT 2010 08 03 11 44 55 31.3200 -97.3300 251.000 30.0 105.647 4.210 -999.990 -999.990 1.056 ..P WKT 2010 08 03 11 49 55 31.3200 -97.3300 251.000 122.0 95.376 4.540 -999.990 -999.990 0.954 ..P WKT 2010 08 03 12 09 55 31.3200 -97.3300 251.000 457.0 97.046 4.340 -999.990 -999.990 0.970 ..P WKT 2010 08 03 12 10 25 31.3200 -97.3300 251.000 457.0 92.063 3.720 -999.990 -999.990 0.921 ..P WKT 2010 08 03 12 10 55 31.3200 -97.3300 251.000 457.0 88.986 3.570 -999.990 -999.990 0.890 ..P WKT 2010 08 03 12 11 25 31.3200 -97.3300 251.000 457.0 87.544 3.890 -999.990 -999.990 0.875 ..P WKT 2010 08 03 12 11 55 31.3200 -97.3300 251.000 457.0 92.096 3.580 -999.990 -999.990 0.921 ..P WKT 2010 08 03 12 12 25 31.3200 -97.3300 251.000 457.0 90.109 3.200 -999.990 -999.990 0.901 ..P WKT 2010 08 03 12 12 55 31.3200 -97.3300 251.000 457.0 88.395 3.530 -999.990 -999.990 0.884 ..P WKT 2010 08 03 12 13 25 31.3200 -97.3300 251.000 457.0 92.402 3.820 -999.990 -999.990 0.924 ..P WKT 2010 08 03 12 13 55 31.3200 -97.3300 251.000 457.0 91.232 3.370 -999.990 -999.990 0.912 ..P WKT 2010 08 03 12 14 25 31.3200 -97.3300 251.000 457.0 89.518 3.350 -999.990 -999.990 0.895 ..P WKT 2010 08 03 12 14 55 31.3200 -97.3300 251.000 457.0 90.528 3.340 -999.990 -999.990 0.905 ..P WKT 2010 08 03 12 19 55 31.3200 -97.3300 251.000 30.0 104.445 3.930 -999.990 -999.990 1.044 ..P WKT 2010 08 03 12 24 55 31.3200 -97.3300 251.000 122.0 99.016 4.400 -999.990 -999.990 0.990 ..P WKT 2010 08 03 12 29 55 31.3200 -97.3300 251.000 457.0 94.677 4.650 -999.990 -999.990 0.947 ..P WKT 2010 08 03 12 34 55 31.3200 -97.3300 251.000 30.0 106.962 3.670 -999.990 -999.990 1.070 ..P WKT 2010 08 03 12 39 55 31.3200 -97.3300 251.000 122.0 95.263 3.410 -999.990 -999.990 0.953 ..P WKT 2010 08 03 12 44 55 31.3200 -97.3300 251.000 457.0 90.787 4.870 -999.990 -999.990 0.908 ..P WKT 2010 08 03 12 54 55 31.3200 -97.3300 251.000 30.0 100.179 3.320 -999.990 -999.990 1.002 ..P WKT 2010 08 03 12 59 55 31.3200 -97.3300 251.000 122.0 99.873 4.040 -999.990 -999.990 0.999 ..P WKT 2010 08 03 13 04 55 31.3200 -97.3300 251.000 457.0 89.071 4.230 -999.990 -999.990 0.891 ..P WKT 2010 08 03 13 09 55 31.3200 -97.3300 251.000 30.0 103.897 3.270 -999.990 -999.990 1.039 ..P WKT 2010 08 03 13 14 55 31.3200 -97.3300 251.000 122.0 96.502 3.920 -999.990 -999.990 0.965 ..P WKT 2010 08 03 13 19 55 31.3200 -97.3300 251.000 457.0 90.606 5.890 -999.990 -999.990 0.906 ..P WKT 2010 08 03 13 29 55 31.3200 -97.3300 251.000 30.0 106.045 4.330 -999.990 -999.990 1.060 ..P WKT 2010 08 03 13 34 55 31.3200 -97.3300 251.000 122.0 106.791 3.250 -999.990 -999.990 1.068 ..P WKT 2010 08 03 13 39 55 31.3200 -97.3300 251.000 457.0 94.582 5.320 -999.990 -999.990 0.946 ..P WKT 2010 08 03 13 44 55 31.3200 -97.3300 251.000 30.0 111.285 2.860 -999.990 -999.990 1.113 ..P WKT 2010 08 03 13 49 55 31.3200 -97.3300 251.000 122.0 102.621 4.080 -999.990 -999.990 1.026 ..P WKT 2010 08 03 13 54 55 31.3200 -97.3300 251.000 457.0 96.274 3.260 -999.990 -999.990 0.963 ..P WKT 2010 08 03 14 04 55 31.3200 -97.3300 251.000 30.0 107.278 5.920 -999.990 -999.990 1.073 ..P WKT 2010 08 03 14 09 55 31.3200 -97.3300 251.000 122.0 107.713 3.590 -999.990 -999.990 1.077 ..P WKT 2010 08 03 14 14 55 31.3200 -97.3300 251.000 457.0 100.916 3.180 -999.990 -999.990 1.009 ..P WKT 2010 08 03 14 19 55 31.3200 -97.3300 251.000 30.0 102.716 3.140 -999.990 -999.990 1.027 ..P WKT 2010 08 03 14 24 55 31.3200 -97.3300 251.000 122.0 114.886 3.280 -999.990 -999.990 1.149 ..P WKT 2010 08 03 14 29 55 31.3200 -97.3300 251.000 457.0 95.535 3.230 -999.990 -999.990 0.955 ..P WKT 2010 08 03 14 39 55 31.3200 -97.3300 251.000 30.0 98.022 3.190 -999.990 -999.990 0.980 ..P WKT 2010 08 03 14 44 55 31.3200 -97.3300 251.000 122.0 105.944 4.110 -999.990 -999.990 1.059 ..P WKT 2010 08 03 14 49 55 31.3200 -97.3300 251.000 457.0 95.850 3.230 -999.990 -999.990 0.958 ..P WKT 2010 08 03 14 54 55 31.3200 -97.3300 251.000 30.0 97.767 3.240 -999.990 -999.990 0.978 ..P WKT 2010 08 03 14 59 55 31.3200 -97.3300 251.000 122.0 109.240 4.460 -999.990 -999.990 1.092 ..P WKT 2010 08 03 15 04 55 31.3200 -97.3300 251.000 457.0 99.962 2.890 -999.990 -999.990 1.000 ..P WKT 2010 08 03 15 14 55 31.3200 -97.3300 251.000 30.0 105.788 3.200 -999.990 -999.990 1.058 ..P WKT 2010 08 03 15 19 55 31.3200 -97.3300 251.000 122.0 111.607 3.700 -999.990 -999.990 1.116 ..P WKT 2010 08 03 15 24 55 31.3200 -97.3300 251.000 457.0 92.026 3.790 -999.990 -999.990 0.920 ..P WKT 2010 08 03 15 29 55 31.3200 -97.3300 251.000 30.0 104.402 3.420 -999.990 -999.990 1.044 ..P WKT 2010 08 03 15 34 55 31.3200 -97.3300 251.000 122.0 114.046 3.820 -999.990 -999.990 1.140 ..P WKT 2010 08 03 15 39 55 31.3200 -97.3300 251.000 457.0 99.926 3.850 -999.990 -999.990 0.999 ..P WKT 2010 08 03 15 49 55 31.3200 -97.3300 251.000 30.0 96.698 3.200 -999.990 -999.990 0.967 ..P WKT 2010 08 03 15 54 55 31.3200 -97.3300 251.000 122.0 105.135 3.450 -999.990 -999.990 1.051 ..P WKT 2010 08 03 15 59 55 31.3200 -97.3300 251.000 457.0 95.265 5.330 -999.990 -999.990 0.953 ..P WKT 2010 08 03 16 04 55 31.3200 -97.3300 251.000 30.0 92.772 6.960 -999.990 -999.990 0.928 ..P WKT 2010 08 03 16 09 55 31.3200 -97.3300 251.000 122.0 104.217 5.960 -999.990 -999.990 1.042 ..P WKT 2010 08 03 16 14 55 31.3200 -97.3300 251.000 457.0 95.984 5.200 -999.990 -999.990 0.960 ..P WKT 2010 08 03 16 24 55 31.3200 -97.3300 251.000 30.0 95.606 4.390 -999.990 -999.990 0.956 ..P WKT 2010 08 03 16 29 55 31.3200 -97.3300 251.000 122.0 105.648 6.710 -999.990 -999.990 1.056 ..P WKT 2010 08 03 16 34 55 31.3200 -97.3300 251.000 457.0 103.798 7.030 -999.990 -999.990 1.038 ..P WKT 2010 08 03 16 39 55 31.3200 -97.3300 251.000 30.0 105.777 6.550 -999.990 -999.990 1.058 ..P WKT 2010 08 03 16 44 55 31.3200 -97.3300 251.000 122.0 111.857 5.630 -999.990 -999.990 1.119 ..P WKT 2010 08 03 16 49 55 31.3200 -97.3300 251.000 457.0 104.950 6.280 -999.990 -999.990 1.050 ..P WKT 2010 08 03 17 04 55 31.3200 -97.3300 251.000 30.0 118.975 5.350 -999.990 -999.990 1.190 ..P WKT 2010 08 03 17 09 55 31.3200 -97.3300 251.000 122.0 127.460 6.210 -999.990 -999.990 1.275 ..P WKT 2010 08 03 17 14 55 31.3200 -97.3300 251.000 457.0 120.767 6.720 -999.990 -999.990 1.208 ..P WKT 2010 08 03 17 19 55 31.3200 -97.3300 251.000 30.0 106.687 4.750 -999.990 -999.990 1.067 ..P WKT 2010 08 03 17 24 55 31.3200 -97.3300 251.000 122.0 121.466 3.100 -999.990 -999.990 1.215 ..P WKT 2010 08 03 17 29 55 31.3200 -97.3300 251.000 457.0 115.864 3.840 -999.990 -999.990 1.159 ..P WKT 2010 08 03 17 39 55 31.3200 -97.3300 251.000 30.0 108.648 3.660 -999.990 -999.990 1.086 ..P WKT 2010 08 03 17 44 55 31.3200 -97.3300 251.000 122.0 111.136 3.340 -999.990 -999.990 1.111 ..P WKT 2010 08 03 17 49 55 31.3200 -97.3300 251.000 457.0 103.364 3.130 -999.990 -999.990 1.034 ..P WKT 2010 08 03 17 54 55 31.3200 -97.3300 251.000 30.0 100.516 3.450 -999.990 -999.990 1.005 ..P WKT 2010 08 03 17 59 55 31.3200 -97.3300 251.000 122.0 105.057 3.520 -999.990 -999.990 1.051 ..P WKT 2010 08 03 18 04 55 31.3200 -97.3300 251.000 457.0 91.261 4.700 -999.990 -999.990 0.913 ..P WKT 2010 08 03 18 14 55 31.3200 -97.3300 251.000 30.0 97.998 3.060 -999.990 -999.990 0.980 ..P WKT 2010 08 03 18 19 55 31.3200 -97.3300 251.000 122.0 114.155 3.090 -999.990 -999.990 1.142 ..P WKT 2010 08 03 18 24 55 31.3200 -97.3300 251.000 457.0 102.253 3.090 -999.990 -999.990 1.023 ..P WKT 2010 08 03 18 29 55 31.3200 -97.3300 251.000 30.0 99.795 3.480 -999.990 -999.990 0.998 ..P WKT 2010 08 03 18 34 55 31.3200 -97.3300 251.000 122.0 110.069 4.180 -999.990 -999.990 1.101 ..P WKT 2010 08 03 18 39 55 31.3200 -97.3300 251.000 457.0 97.343 3.310 -999.990 -999.990 0.973 ..P WKT 2010 08 03 18 49 55 31.3200 -97.3300 251.000 30.0 102.264 4.630 -999.990 -999.990 1.023 ..P WKT 2010 08 03 18 54 55 31.3200 -97.3300 251.000 122.0 111.425 4.400 -999.990 -999.990 1.114 ..P WKT 2010 08 03 18 59 55 31.3200 -97.3300 251.000 457.0 103.059 3.370 -999.990 -999.990 1.031 ..P WKT 2010 08 03 19 04 55 31.3200 -97.3300 251.000 30.0 91.678 4.420 -999.990 -999.990 0.917 ..P WKT 2010 08 03 19 09 55 31.3200 -97.3300 251.000 122.0 109.606 3.460 -999.990 -999.990 1.096 ..P WKT 2010 08 03 19 14 55 31.3200 -97.3300 251.000 457.0 95.759 3.510 -999.990 -999.990 0.958 ..P WKT 2010 08 03 19 24 55 31.3200 -97.3300 251.000 30.0 98.080 3.270 -999.990 -999.990 0.981 ..P WKT 2010 08 03 19 29 55 31.3200 -97.3300 251.000 122.0 105.757 3.620 -999.990 -999.990 1.058 ..P WKT 2010 08 03 19 34 55 31.3200 -97.3300 251.000 457.0 96.721 4.300 -999.990 -999.990 0.967 ..P WKT 2010 08 03 19 39 55 31.3200 -97.3300 251.000 30.0 103.303 3.300 -999.990 -999.990 1.033 ..P WKT 2010 08 03 19 44 55 31.3200 -97.3300 251.000 122.0 112.901 3.660 -999.990 -999.990 1.129 ..P WKT 2010 08 03 19 49 55 31.3200 -97.3300 251.000 457.0 109.619 4.190 -999.990 -999.990 1.096 ..P WKT 2010 08 03 19 59 55 31.3200 -97.3300 251.000 30.0 98.081 3.560 -999.990 -999.990 0.981 ..P WKT 2010 08 03 20 04 55 31.3200 -97.3300 251.000 122.0 113.398 3.280 -999.990 -999.990 1.134 ..P WKT 2010 08 03 20 09 55 31.3200 -97.3300 251.000 457.0 107.061 3.730 -999.990 -999.990 1.071 ..P WKT 2010 08 03 20 14 55 31.3200 -97.3300 251.000 30.0 108.124 5.710 -999.990 -999.990 1.081 ..P WKT 2010 08 03 20 19 55 31.3200 -97.3300 251.000 122.0 119.607 3.230 -999.990 -999.990 1.196 ..P WKT 2010 08 03 20 24 55 31.3200 -97.3300 251.000 457.0 104.221 4.310 -999.990 -999.990 1.042 ..P WKT 2010 08 03 20 34 55 31.3200 -97.3300 251.000 30.0 102.745 4.300 -999.990 -999.990 1.027 ..P WKT 2010 08 03 20 39 55 31.3200 -97.3300 251.000 122.0 113.642 2.980 -999.990 -999.990 1.136 ..P WKT 2010 08 03 20 44 55 31.3200 -97.3300 251.000 457.0 102.874 3.440 -999.990 -999.990 1.029 ..P WKT 2010 08 03 20 49 55 31.3200 -97.3300 251.000 30.0 100.608 3.460 -999.990 -999.990 1.006 ..P WKT 2010 08 03 20 54 55 31.3200 -97.3300 251.000 122.0 110.547 4.360 -999.990 -999.990 1.105 ..P WKT 2010 08 03 20 59 55 31.3200 -97.3300 251.000 457.0 96.623 3.880 -999.990 -999.990 0.966 ..P WKT 2010 08 03 21 09 55 31.3200 -97.3300 251.000 30.0 96.909 4.590 -999.990 -999.990 0.969 ..P WKT 2010 08 03 21 14 55 31.3200 -97.3300 251.000 122.0 111.397 4.530 -999.990 -999.990 1.114 ..P WKT 2010 08 03 21 19 55 31.3200 -97.3300 251.000 457.0 98.998 4.610 -999.990 -999.990 0.990 ..P WKT 2010 08 03 21 24 55 31.3200 -97.3300 251.000 30.0 101.140 6.040 -999.990 -999.990 1.011 ..P WKT 2010 08 03 21 29 55 31.3200 -97.3300 251.000 122.0 109.320 4.680 -999.990 -999.990 1.093 ..P WKT 2010 08 03 21 34 55 31.3200 -97.3300 251.000 457.0 100.898 4.510 -999.990 -999.990 1.009 ..P WKT 2010 08 03 21 44 55 31.3200 -97.3300 251.000 30.0 105.027 5.040 -999.990 -999.990 1.050 ..P WKT 2010 08 03 21 49 55 31.3200 -97.3300 251.000 122.0 109.071 4.850 -999.990 -999.990 1.091 ..P WKT 2010 08 03 21 54 55 31.3200 -97.3300 251.000 457.0 97.882 4.780 -999.990 -999.990 0.979 ..P WKT 2010 08 03 21 59 55 31.3200 -97.3300 251.000 30.0 97.123 4.570 -999.990 -999.990 0.971 ..P WKT 2010 08 03 22 04 55 31.3200 -97.3300 251.000 122.0 106.934 5.470 -999.990 -999.990 1.069 ..P WKT 2010 08 03 22 09 55 31.3200 -97.3300 251.000 457.0 100.273 5.060 -999.990 -999.990 1.003 ..P WKT 2010 08 03 22 19 55 31.3200 -97.3300 251.000 30.0 101.795 4.290 -999.990 -999.990 1.018 ..P WKT 2010 08 03 22 24 55 31.3200 -97.3300 251.000 122.0 112.589 5.130 -999.990 -999.990 1.126 ..P WKT 2010 08 03 22 29 55 31.3200 -97.3300 251.000 457.0 102.376 4.020 -999.990 -999.990 1.024 ..P WKT 2010 08 03 22 34 55 31.3200 -97.3300 251.000 30.0 97.379 3.820 -999.990 -999.990 0.974 ..P WKT 2010 08 03 22 39 55 31.3200 -97.3300 251.000 122.0 114.356 3.540 -999.990 -999.990 1.144 ..P WKT 2010 08 03 22 44 55 31.3200 -97.3300 251.000 457.0 107.986 2.950 -999.990 -999.990 1.080 ..P WKT 2010 08 03 22 54 55 31.3200 -97.3300 251.000 30.0 101.779 3.620 -999.990 -999.990 1.018 ..P WKT 2010 08 03 22 59 55 31.3200 -97.3300 251.000 122.0 109.634 4.160 -999.990 -999.990 1.096 ..P WKT 2010 08 03 23 04 55 31.3200 -97.3300 251.000 457.0 106.501 3.740 -999.990 -999.990 1.065 ..P WKT 2010 08 03 23 09 55 31.3200 -97.3300 251.000 30.0 108.863 3.940 -999.990 -999.990 1.089 ..P WKT 2010 08 03 23 14 55 31.3200 -97.3300 251.000 122.0 120.293 3.790 -999.990 -999.990 1.203 ..P WKT 2010 08 03 23 19 55 31.3200 -97.3300 251.000 457.0 115.236 3.670 -999.990 -999.990 1.152 ..P WKT 2010 08 03 23 29 55 31.3200 -97.3300 251.000 30.0 113.826 4.480 -999.990 -999.990 1.138 ..P WKT 2010 08 03 23 34 55 31.3200 -97.3300 251.000 122.0 118.025 3.600 -999.990 -999.990 1.180 ..P WKT 2010 08 03 23 39 55 31.3200 -97.3300 251.000 457.0 118.100 4.860 -999.990 -999.990 1.181 ..P WKT 2010 08 03 23 44 55 31.3200 -97.3300 251.000 30.0 114.878 4.860 -999.990 -999.990 1.149 ..P WKT 2010 08 03 23 49 55 31.3200 -97.3300 251.000 122.0 127.325 4.890 -999.990 -999.990 1.273 ..P WKT 2010 08 04 00 09 55 31.3200 -97.3300 251.000 457.0 105.249 2.720 -999.990 -999.990 1.052 ..P WKT 2010 08 04 00 10 25 31.3200 -97.3300 251.000 457.0 109.092 3.000 -999.990 -999.990 1.091 ..P WKT 2010 08 04 00 10 55 31.3200 -97.3300 251.000 457.0 105.236 2.890 -999.990 -999.990 1.052 ..P WKT 2010 08 04 00 11 25 31.3200 -97.3300 251.000 457.0 104.129 2.840 -999.990 -999.990 1.041 ..P WKT 2010 08 04 00 11 55 31.3200 -97.3300 251.000 457.0 107.972 2.790 -999.990 -999.990 1.080 ..P WKT 2010 08 04 00 12 25 31.3200 -97.3300 251.000 457.0 112.089 3.190 -999.990 -999.990 1.121 ..P WKT 2010 08 04 00 12 55 31.3200 -97.3300 251.000 457.0 114.557 2.830 -999.990 -999.990 1.146 ..P WKT 2010 08 04 00 13 25 31.3200 -97.3300 251.000 457.0 109.052 2.820 -999.990 -999.990 1.091 ..P WKT 2010 08 04 00 13 55 31.3200 -97.3300 251.000 457.0 112.619 2.820 -999.990 -999.990 1.126 ..P WKT 2010 08 04 00 14 25 31.3200 -97.3300 251.000 457.0 113.438 3.070 -999.990 -999.990 1.134 ..P WKT 2010 08 04 00 14 55 31.3200 -97.3300 251.000 457.0 116.180 3.890 -999.990 -999.990 1.162 ..P WKT 2010 08 04 00 19 55 31.3200 -97.3300 251.000 30.0 107.314 3.510 -999.990 -999.990 1.073 ..P WKT 2010 08 04 00 24 55 31.3200 -97.3300 251.000 122.0 117.696 4.000 -999.990 -999.990 1.177 ..P WKT 2010 08 04 00 29 55 31.3200 -97.3300 251.000 457.0 113.229 3.380 -999.990 -999.990 1.132 ..P WKT 2010 08 04 00 34 55 31.3200 -97.3300 251.000 30.0 105.736 3.280 -999.990 -999.990 1.057 ..P WKT 2010 08 04 00 39 55 31.3200 -97.3300 251.000 122.0 115.432 3.540 -999.990 -999.990 1.154 ..P WKT 2010 08 04 00 44 55 31.3200 -97.3300 251.000 457.0 114.403 3.790 -999.990 -999.990 1.144 ..P WKT 2010 08 04 00 54 55 31.3200 -97.3300 251.000 30.0 115.912 3.800 -999.990 -999.990 1.159 ..P WKT 2010 08 04 00 59 55 31.3200 -97.3300 251.000 122.0 118.726 3.980 -999.990 -999.990 1.187 ..P WKT 2010 08 04 01 04 55 31.3200 -97.3300 251.000 457.0 114.526 4.010 -999.990 -999.990 1.145 ..P WKT 2010 08 04 01 09 55 31.3200 -97.3300 251.000 30.0 114.452 3.890 -999.990 -999.990 1.145 ..P WKT 2010 08 04 01 14 55 31.3200 -97.3300 251.000 122.0 122.218 4.290 -999.990 -999.990 1.222 ..P WKT 2010 08 04 01 19 55 31.3200 -97.3300 251.000 457.0 113.204 4.950 -999.990 -999.990 1.132 ..P WKT 2010 08 04 01 29 55 31.3200 -97.3300 251.000 30.0 115.376 4.340 -999.990 -999.990 1.154 ..P WKT 2010 08 04 01 34 55 31.3200 -97.3300 251.000 122.0 128.351 4.450 -999.990 -999.990 1.284 ..P WKT 2010 08 04 01 39 55 31.3200 -97.3300 251.000 457.0 122.892 3.700 -999.990 -999.990 1.229 ..P WKT 2010 08 04 01 44 55 31.3200 -97.3300 251.000 30.0 120.736 3.500 -999.990 -999.990 1.207 ..P WKT 2010 08 04 01 49 55 31.3200 -97.3300 251.000 122.0 132.887 3.190 -999.990 -999.990 1.329 ..P WKT 2010 08 04 01 54 55 31.3200 -97.3300 251.000 457.0 127.704 3.280 -999.990 -999.990 1.277 ..P WKT 2010 08 04 02 04 55 31.3200 -97.3300 251.000 30.0 128.697 2.780 -999.990 -999.990 1.287 ..P WKT 2010 08 04 02 09 55 31.3200 -97.3300 251.000 122.0 135.700 3.450 -999.990 -999.990 1.357 ..P WKT 2010 08 04 02 14 55 31.3200 -97.3300 251.000 457.0 117.247 5.120 -999.990 -999.990 1.172 ..P WKT 2010 08 04 02 19 55 31.3200 -97.3300 251.000 30.0 129.755 3.660 -999.990 -999.990 1.298 ..P WKT 2010 08 04 02 24 55 31.3200 -97.3300 251.000 122.0 129.190 4.770 -999.990 -999.990 1.292 ..P WKT 2010 08 04 02 29 55 31.3200 -97.3300 251.000 457.0 111.423 4.900 -999.990 -999.990 1.114 ..P WKT 2010 08 04 02 39 55 31.3200 -97.3300 251.000 30.0 131.389 4.250 -999.990 -999.990 1.314 ..P WKT 2010 08 04 02 44 55 31.3200 -97.3300 251.000 122.0 115.448 4.080 -999.990 -999.990 1.154 ..P WKT 2010 08 04 02 49 55 31.3200 -97.3300 251.000 457.0 105.562 4.230 -999.990 -999.990 1.056 ..P WKT 2010 08 04 02 54 55 31.3200 -97.3300 251.000 30.0 117.975 3.900 -999.990 -999.990 1.180 ..P WKT 2010 08 04 02 59 55 31.3200 -97.3300 251.000 122.0 119.926 3.200 -999.990 -999.990 1.199 ..P WKT 2010 08 04 03 04 55 31.3200 -97.3300 251.000 457.0 106.736 3.610 -999.990 -999.990 1.067 ..P WKT 2010 08 04 03 14 55 31.3200 -97.3300 251.000 30.0 121.849 2.640 -999.990 -999.990 1.218 ..P WKT 2010 08 04 03 19 55 31.3200 -97.3300 251.000 122.0 120.694 2.570 -999.990 -999.990 1.207 ..P WKT 2010 08 04 03 24 55 31.3200 -97.3300 251.000 457.0 108.524 3.780 -999.990 -999.990 1.085 ..P WKT 2010 08 04 03 29 55 31.3200 -97.3300 251.000 30.0 121.412 2.470 -999.990 -999.990 1.214 ..P WKT 2010 08 04 03 34 55 31.3200 -97.3300 251.000 122.0 120.256 3.000 -999.990 -999.990 1.203 ..P WKT 2010 08 04 03 39 55 31.3200 -97.3300 251.000 457.0 107.535 2.090 -999.990 -999.990 1.075 ..P WKT 2010 08 04 03 49 55 31.3200 -97.3300 251.000 30.0 126.311 2.610 -999.990 -999.990 1.263 ..P WKT 2010 08 04 03 54 55 31.3200 -97.3300 251.000 122.0 116.225 5.900 -999.990 -999.990 1.162 ..P WKT 2010 08 04 03 59 55 31.3200 -97.3300 251.000 457.0 99.802 2.400 -999.990 -999.990 0.998 ..P WKT 2010 08 04 04 04 55 31.3200 -97.3300 251.000 30.0 117.808 3.090 -999.990 -999.990 1.178 ..P WKT 2010 08 04 04 09 55 31.3200 -97.3300 251.000 122.0 122.594 3.240 -999.990 -999.990 1.226 ..P WKT 2010 08 04 04 14 55 31.3200 -97.3300 251.000 457.0 106.446 3.540 -999.990 -999.990 1.064 ..P WKT 2010 08 04 04 24 55 31.3200 -97.3300 251.000 30.0 124.262 3.380 -999.990 -999.990 1.243 ..P WKT 2010 08 04 04 29 55 31.3200 -97.3300 251.000 122.0 113.878 3.890 -999.990 -999.990 1.139 ..P WKT 2010 08 04 04 34 55 31.3200 -97.3300 251.000 457.0 108.039 3.710 -999.990 -999.990 1.080 ..P WKT 2010 08 04 04 39 55 31.3200 -97.3300 251.000 30.0 124.927 4.110 -999.990 -999.990 1.249 ..P WKT 2010 08 04 04 44 55 31.3200 -97.3300 251.000 122.0 115.369 4.040 -999.990 -999.990 1.154 ..P WKT 2010 08 04 04 49 55 31.3200 -97.3300 251.000 457.0 110.493 3.550 -999.990 -999.990 1.105 ..P WKT 2010 08 04 05 04 55 31.3200 -97.3300 251.000 30.0 120.614 3.260 -999.990 -999.990 1.206 ..P WKT 2010 08 04 05 09 55 31.3200 -97.3300 251.000 122.0 123.842 3.200 -999.990 -999.990 1.238 ..P WKT 2010 08 04 05 14 55 31.3200 -97.3300 251.000 457.0 107.781 4.110 -999.990 -999.990 1.078 ..P WKT 2010 08 04 05 19 55 31.3200 -97.3300 251.000 30.0 120.792 3.220 -999.990 -999.990 1.208 ..P WKT 2010 08 04 05 24 55 31.3200 -97.3300 251.000 122.0 130.909 3.010 -999.990 -999.990 1.309 ..P WKT 2010 08 04 05 29 55 31.3200 -97.3300 251.000 457.0 110.988 2.740 -999.990 -999.990 1.110 ..P WKT 2010 08 04 05 39 55 31.3200 -97.3300 251.000 30.0 124.655 4.280 -999.990 -999.990 1.247 ..P WKT 2010 08 04 05 44 55 31.3200 -97.3300 251.000 122.0 120.625 3.270 -999.990 -999.990 1.206 ..P WKT 2010 08 04 05 49 55 31.3200 -97.3300 251.000 457.0 115.353 4.030 -999.990 -999.990 1.154 ..P WKT 2010 08 04 05 54 55 31.3200 -97.3300 251.000 30.0 123.037 3.710 -999.990 -999.990 1.230 ..P WKT 2010 08 04 05 59 55 31.3200 -97.3300 251.000 122.0 126.448 3.240 -999.990 -999.990 1.264 ..P WKT 2010 08 04 06 04 55 31.3200 -97.3300 251.000 457.0 102.983 3.030 -999.990 -999.990 1.030 ..P WKT 2010 08 04 06 14 55 31.3200 -97.3300 251.000 30.0 122.683 4.060 -999.990 -999.990 1.227 ..P WKT 2010 08 04 06 19 55 31.3200 -97.3300 251.000 122.0 133.598 4.050 -999.990 -999.990 1.336 ..P WKT 2010 08 04 06 24 55 31.3200 -97.3300 251.000 457.0 112.395 4.100 -999.990 -999.990 1.124 ..P WKT 2010 08 04 06 29 55 31.3200 -97.3300 251.000 30.0 126.894 3.420 -999.990 -999.990 1.269 ..P WKT 2010 08 04 06 34 55 31.3200 -97.3300 251.000 122.0 127.608 4.120 -999.990 -999.990 1.276 ..P WKT 2010 08 04 06 39 55 31.3200 -97.3300 251.000 457.0 120.327 3.270 -999.990 -999.990 1.203 ..P WKT 2010 08 04 06 49 55 31.3200 -97.3300 251.000 30.0 119.687 3.720 -999.990 -999.990 1.197 ..P WKT 2010 08 04 06 54 55 31.3200 -97.3300 251.000 122.0 128.811 3.400 -999.990 -999.990 1.288 ..P WKT 2010 08 04 06 59 55 31.3200 -97.3300 251.000 457.0 112.843 3.440 -999.990 -999.990 1.128 ..P WKT 2010 08 04 07 04 55 31.3200 -97.3300 251.000 30.0 124.174 3.060 -999.990 -999.990 1.242 ..P WKT 2010 08 04 07 09 55 31.3200 -97.3300 251.000 122.0 126.681 3.790 -999.990 -999.990 1.267 ..P WKT 2010 08 04 07 14 55 31.3200 -97.3300 251.000 457.0 115.122 3.600 -999.990 -999.990 1.151 ..P WKT 2010 08 04 07 24 55 31.3200 -97.3300 251.000 30.0 118.323 2.730 -999.990 -999.990 1.183 ..P WKT 2010 08 04 07 29 55 31.3200 -97.3300 251.000 122.0 127.017 2.800 -999.990 -999.990 1.270 ..P WKT 2010 08 04 07 34 55 31.3200 -97.3300 251.000 457.0 123.575 2.490 -999.990 -999.990 1.236 ..P WKT 2010 08 04 07 39 55 31.3200 -97.3300 251.000 30.0 125.924 2.440 -999.990 -999.990 1.259 ..P WKT 2010 08 04 07 44 55 31.3200 -97.3300 251.000 122.0 127.998 3.700 -999.990 -999.990 1.280 ..P WKT 2010 08 04 07 49 55 31.3200 -97.3300 251.000 457.0 114.073 2.280 -999.990 -999.990 1.141 ..P WKT 2010 08 04 07 59 55 31.3200 -97.3300 251.000 30.0 128.428 3.370 -999.990 -999.990 1.284 ..P WKT 2010 08 04 08 04 55 31.3200 -97.3300 251.000 122.0 120.847 1.930 -999.990 -999.990 1.208 ..P WKT 2010 08 04 08 09 55 31.3200 -97.3300 251.000 457.0 113.265 1.850 -999.990 -999.990 1.133 ..P WKT 2010 08 04 08 14 55 31.3200 -97.3300 251.000 30.0 118.374 2.160 -999.990 -999.990 1.184 ..P WKT 2010 08 04 08 19 55 31.3200 -97.3300 251.000 122.0 126.794 2.160 -999.990 -999.990 1.268 ..P WKT 2010 08 04 08 24 55 31.3200 -97.3300 251.000 457.0 115.211 2.340 -999.990 -999.990 1.152 ..P WKT 2010 08 04 08 34 55 31.3200 -97.3300 251.000 30.0 120.110 2.190 -999.990 -999.990 1.201 ..P WKT 2010 08 04 08 39 55 31.3200 -97.3300 251.000 122.0 122.381 2.120 -999.990 -999.990 1.224 ..P WKT 2010 08 04 08 44 55 31.3200 -97.3300 251.000 457.0 122.308 2.620 -999.990 -999.990 1.223 ..P WKT 2010 08 04 08 49 55 31.3200 -97.3300 251.000 30.0 118.233 2.830 -999.990 -999.990 1.182 ..P WKT 2010 08 04 08 54 55 31.3200 -97.3300 251.000 122.0 127.542 2.480 -999.990 -999.990 1.275 ..P WKT 2010 08 04 08 59 55 31.3200 -97.3300 251.000 457.0 115.739 2.390 -999.990 -999.990 1.157 ..P WKT 2010 08 04 09 09 55 31.3200 -97.3300 251.000 30.0 123.083 2.800 -999.990 -999.990 1.231 ..P WKT 2010 08 04 09 14 55 31.3200 -97.3300 251.000 122.0 130.915 3.690 -999.990 -999.990 1.309 ..P WKT 2010 08 04 09 19 55 31.3200 -97.3300 251.000 457.0 110.042 3.780 -999.990 -999.990 1.100 ..P WKT 2010 08 04 09 24 55 31.3200 -97.3300 251.000 30.0 118.977 3.110 -999.990 -999.990 1.190 ..P WKT 2010 08 04 09 29 55 31.3200 -97.3300 251.000 122.0 139.508 4.270 -999.990 -999.990 1.395 ..P WKT 2010 08 04 09 34 55 31.3200 -97.3300 251.000 457.0 115.735 3.900 -999.990 -999.990 1.157 ..P WKT 2010 08 04 09 44 55 31.3200 -97.3300 251.000 30.0 121.640 3.610 -999.990 -999.990 1.216 ..P WKT 2010 08 04 09 49 55 31.3200 -97.3300 251.000 122.0 138.210 4.070 -999.990 -999.990 1.382 ..P WKT 2010 08 04 09 54 55 31.3200 -97.3300 251.000 457.0 116.267 3.160 -999.990 -999.990 1.163 ..P WKT 2010 08 04 09 59 55 31.3200 -97.3300 251.000 30.0 122.070 3.130 -999.990 -999.990 1.221 ..P WKT 2010 08 04 10 04 55 31.3200 -97.3300 251.000 122.0 134.776 2.820 -999.990 -999.990 1.348 ..P WKT 2010 08 04 10 09 55 31.3200 -97.3300 251.000 457.0 116.282 2.710 -999.990 -999.990 1.163 ..P WKT 2010 08 04 10 19 55 31.3200 -97.3300 251.000 30.0 132.051 3.230 -999.990 -999.990 1.321 ..P WKT 2010 08 04 10 24 55 31.3200 -97.3300 251.000 122.0 130.558 2.590 -999.990 -999.990 1.306 ..P WKT 2010 08 04 10 29 55 31.3200 -97.3300 251.000 457.0 112.772 2.170 -999.990 -999.990 1.128 ..P WKT 2010 08 04 10 34 55 31.3200 -97.3300 251.000 30.0 129.503 4.370 -999.990 -999.990 1.295 ..P WKT 2010 08 04 10 39 55 31.3200 -97.3300 251.000 122.0 129.667 3.320 -999.990 -999.990 1.297 ..P WKT 2010 08 04 10 44 55 31.3200 -97.3300 251.000 457.0 112.431 2.730 -999.990 -999.990 1.124 ..P WKT 2010 08 04 10 54 55 31.3200 -97.3300 251.000 30.0 124.297 2.570 -999.990 -999.990 1.243 ..P WKT 2010 08 04 10 59 55 31.3200 -97.3300 251.000 122.0 125.230 2.980 -999.990 -999.990 1.252 ..P WKT 2010 08 04 11 04 55 31.3200 -97.3300 251.000 457.0 103.790 2.760 -999.990 -999.990 1.038 ..P WKT 2010 08 04 11 09 55 31.3200 -97.3300 251.000 30.0 124.886 3.120 -999.990 -999.990 1.249 ..P WKT 2010 08 04 11 14 55 31.3200 -97.3300 251.000 122.0 126.371 3.320 -999.990 -999.990 1.264 ..P WKT 2010 08 04 11 19 55 31.3200 -97.3300 251.000 457.0 115.426 2.290 -999.990 -999.990 1.154 ..P WKT 2010 08 04 11 29 55 31.3200 -97.3300 251.000 30.0 126.535 5.220 -999.990 -999.990 1.265 ..P WKT 2010 08 04 11 34 55 31.3200 -97.3300 251.000 122.0 122.347 2.710 -999.990 -999.990 1.223 ..P WKT 2010 08 04 11 39 55 31.3200 -97.3300 251.000 457.0 106.832 4.010 -999.990 -999.990 1.068 ..P WKT 2010 08 04 11 44 55 31.3200 -97.3300 251.000 30.0 126.403 3.200 -999.990 -999.990 1.264 ..P WKT 2010 08 04 11 49 55 31.3200 -97.3300 251.000 122.0 120.281 3.430 -999.990 -999.990 1.203 ..P WKT 2010 08 04 12 09 55 31.3200 -97.3300 251.000 457.0 109.069 3.170 -999.990 -999.990 1.091 ..P WKT 2010 08 04 12 10 25 31.3200 -97.3300 251.000 457.0 112.057 2.770 -999.990 -999.990 1.121 ..P WKT 2010 08 04 12 10 55 31.3200 -97.3300 251.000 457.0 110.069 2.240 -999.990 -999.990 1.101 ..P WKT 2010 08 04 12 11 25 31.3200 -97.3300 251.000 457.0 113.333 3.950 -999.990 -999.990 1.133 ..P WKT 2010 08 04 12 11 55 31.3200 -97.3300 251.000 457.0 108.856 2.520 -999.990 -999.990 1.089 ..P WKT 2010 08 04 12 12 25 31.3200 -97.3300 251.000 457.0 105.485 2.930 -999.990 -999.990 1.055 ..P WKT 2010 08 04 12 12 55 31.3200 -97.3300 251.000 457.0 117.598 4.170 -999.990 -999.990 1.176 ..P WKT 2010 08 04 12 13 25 31.3200 -97.3300 251.000 457.0 109.250 2.490 -999.990 -999.990 1.093 ..P WKT 2010 08 04 12 13 55 31.3200 -97.3300 251.000 457.0 111.132 3.310 -999.990 -999.990 1.111 ..P WKT 2010 08 04 12 14 25 31.3200 -97.3300 251.000 457.0 112.738 2.440 -999.990 -999.990 1.127 ..P WKT 2010 08 04 12 14 55 31.3200 -97.3300 251.000 457.0 109.781 2.740 -999.990 -999.990 1.098 ..P WKT 2010 08 04 12 19 55 31.3200 -97.3300 251.000 30.0 129.716 3.310 -999.990 -999.990 1.297 ..P WKT 2010 08 04 12 24 55 31.3200 -97.3300 251.000 122.0 122.826 3.100 -999.990 -999.990 1.228 ..P WKT 2010 08 04 12 29 55 31.3200 -97.3300 251.000 457.0 109.845 5.760 -999.990 -999.990 1.098 ..P WKT 2010 08 04 12 34 55 31.3200 -97.3300 251.000 30.0 133.254 3.810 -999.990 -999.990 1.333 ..P WKT 2010 08 04 12 39 55 31.3200 -97.3300 251.000 122.0 124.837 3.830 -999.990 -999.990 1.248 ..P WKT 2010 08 04 12 44 55 31.3200 -97.3300 251.000 457.0 105.755 3.520 -999.990 -999.990 1.058 ..P WKT 2010 08 04 12 54 55 31.3200 -97.3300 251.000 30.0 122.244 2.340 -999.990 -999.990 1.222 ..P WKT 2010 08 04 12 59 55 31.3200 -97.3300 251.000 122.0 117.937 3.290 -999.990 -999.990 1.179 ..P WKT 2010 08 04 13 04 55 31.3200 -97.3300 251.000 457.0 100.048 2.770 -999.990 -999.990 1.000 ..P WKT 2010 08 04 13 09 55 31.3200 -97.3300 251.000 30.0 127.617 3.460 -999.990 -999.990 1.276 ..P WKT 2010 08 04 13 14 55 31.3200 -97.3300 251.000 122.0 127.607 3.390 -999.990 -999.990 1.276 ..P WKT 2010 08 04 13 19 55 31.3200 -97.3300 251.000 457.0 100.554 3.050 -999.990 -999.990 1.006 ..P WKT 2010 08 04 13 29 55 31.3200 -97.3300 251.000 30.0 128.192 3.420 -999.990 -999.990 1.282 ..P WKT 2010 08 04 13 34 55 31.3200 -97.3300 251.000 122.0 136.430 3.600 -999.990 -999.990 1.364 ..P WKT 2010 08 04 13 39 55 31.3200 -97.3300 251.000 457.0 108.302 5.050 -999.990 -999.990 1.083 ..P WKT 2010 08 04 13 44 55 31.3200 -97.3300 251.000 30.0 136.117 6.870 -999.990 -999.990 1.361 ..P WKT 2010 08 04 13 49 55 31.3200 -97.3300 251.000 122.0 143.529 6.300 -999.990 -999.990 1.435 ..P WKT 2010 08 04 13 54 55 31.3200 -97.3300 251.000 457.0 112.883 3.800 -999.990 -999.990 1.129 ..P WKT 2010 08 04 14 04 55 31.3200 -97.3300 251.000 30.0 137.515 4.770 -999.990 -999.990 1.375 ..P WKT 2010 08 04 14 09 55 31.3200 -97.3300 251.000 122.0 144.042 6.060 -999.990 -999.990 1.440 ..P WKT 2010 08 04 14 14 55 31.3200 -97.3300 251.000 457.0 99.819 6.790 -999.990 -999.990 0.998 ..P WKT 2010 08 04 14 19 55 31.3200 -97.3300 251.000 30.0 136.798 5.240 -999.990 -999.990 1.368 ..P WKT 2010 08 04 14 24 55 31.3200 -97.3300 251.000 122.0 141.241 5.070 -999.990 -999.990 1.412 ..P WKT 2010 08 04 14 29 55 31.3200 -97.3300 251.000 457.0 101.717 2.650 -999.990 -999.990 1.017 ..P WKT 2010 08 04 14 39 55 31.3200 -97.3300 251.000 30.0 129.230 3.510 -999.990 -999.990 1.292 ..P WKT 2010 08 04 14 44 55 31.3200 -97.3300 251.000 122.0 137.276 4.470 -999.990 -999.990 1.373 ..P WKT 2010 08 04 14 49 55 31.3200 -97.3300 251.000 457.0 106.051 5.120 -999.990 -999.990 1.061 ..P WKT 2010 08 04 14 54 55 31.3200 -97.3300 251.000 30.0 128.027 3.860 -999.990 -999.990 1.280 ..P WKT 2010 08 04 14 59 55 31.3200 -97.3300 251.000 122.0 142.210 3.680 -999.990 -999.990 1.422 ..P WKT 2010 08 04 15 04 55 31.3200 -97.3300 251.000 457.0 103.438 3.640 -999.990 -999.990 1.034 ..P WKT 2010 08 04 15 14 55 31.3200 -97.3300 251.000 30.0 131.693 4.730 -999.990 -999.990 1.317 ..P WKT 2010 08 04 15 19 55 31.3200 -97.3300 251.000 122.0 143.819 3.940 -999.990 -999.990 1.438 ..P WKT 2010 08 04 15 24 55 31.3200 -97.3300 251.000 457.0 108.796 4.190 -999.990 -999.990 1.088 ..P WKT 2010 08 04 15 29 55 31.3200 -97.3300 251.000 30.0 132.644 3.910 -999.990 -999.990 1.326 ..P WKT 2010 08 04 15 34 55 31.3200 -97.3300 251.000 122.0 141.987 4.190 -999.990 -999.990 1.420 ..P WKT 2010 08 04 15 39 55 31.3200 -97.3300 251.000 457.0 108.613 1.620 -999.990 -999.990 1.086 ..P WKT 2010 08 04 15 49 55 31.3200 -97.3300 251.000 30.0 120.696 1.970 -999.990 -999.990 1.207 ..P WKT 2010 08 04 15 54 55 31.3200 -97.3300 251.000 122.0 124.836 3.120 -999.990 -999.990 1.248 ..P WKT 2010 08 04 15 59 55 31.3200 -97.3300 251.000 457.0 109.415 3.030 -999.990 -999.990 1.094 ..P WKT 2010 08 04 16 04 55 31.3200 -97.3300 251.000 30.0 124.456 2.760 -999.990 -999.990 1.245 ..P WKT 2010 08 04 16 09 55 31.3200 -97.3300 251.000 122.0 129.998 3.180 -999.990 -999.990 1.300 ..P WKT 2010 08 04 16 14 55 31.3200 -97.3300 251.000 457.0 120.439 1.780 -999.990 -999.990 1.204 ..P WKT 2010 08 04 16 24 55 31.3200 -97.3300 251.000 30.0 129.471 2.340 -999.990 -999.990 1.295 ..P WKT 2010 08 04 16 29 55 31.3200 -97.3300 251.000 122.0 135.058 2.480 -999.990 -999.990 1.351 ..P WKT 2010 08 04 16 34 55 31.3200 -97.3300 251.000 457.0 132.111 2.810 -999.990 -999.990 1.321 ..P WKT 2010 08 04 16 39 55 31.3200 -97.3300 251.000 30.0 123.562 3.080 -999.990 -999.990 1.236 ..P WKT 2010 08 04 16 44 55 31.3200 -97.3300 251.000 122.0 130.413 2.040 -999.990 -999.990 1.304 ..P WKT 2010 08 04 16 49 55 31.3200 -97.3300 251.000 457.0 120.319 3.240 -999.990 -999.990 1.203 ..P WKT 2010 08 04 17 04 55 31.3200 -97.3300 251.000 30.0 117.906 3.560 -999.990 -999.990 1.179 ..P WKT 2010 08 04 17 09 55 31.3200 -97.3300 251.000 122.0 121.472 4.380 -999.990 -999.990 1.215 ..P WKT 2010 08 04 17 14 55 31.3200 -97.3300 251.000 457.0 117.326 3.150 -999.990 -999.990 1.173 ..P WKT 2010 08 04 17 19 55 31.3200 -97.3300 251.000 30.0 121.173 2.430 -999.990 -999.990 1.212 ..P WKT 2010 08 04 17 24 55 31.3200 -97.3300 251.000 122.0 128.390 2.990 -999.990 -999.990 1.284 ..P WKT 2010 08 04 17 29 55 31.3200 -97.3300 251.000 457.0 121.155 3.150 -999.990 -999.990 1.212 ..P WKT 2010 08 04 17 39 55 31.3200 -97.3300 251.000 30.0 113.342 3.000 -999.990 -999.990 1.133 ..P WKT 2010 08 04 17 44 55 31.3200 -97.3300 251.000 122.0 121.896 3.230 -999.990 -999.990 1.219 ..P WKT 2010 08 04 17 49 55 31.3200 -97.3300 251.000 457.0 119.497 4.380 -999.990 -999.990 1.195 ..P WKT 2010 08 04 17 54 55 31.3200 -97.3300 251.000 30.0 117.799 3.440 -999.990 -999.990 1.178 ..P WKT 2010 08 04 17 59 55 31.3200 -97.3300 251.000 122.0 129.733 4.340 -999.990 -999.990 1.297 ..P WKT 2010 08 04 18 04 55 31.3200 -97.3300 251.000 457.0 118.197 2.250 -999.990 -999.990 1.182 ..P WKT 2010 08 04 18 14 55 31.3200 -97.3300 251.000 30.0 110.517 3.980 -999.990 -999.990 1.105 ..P WKT 2010 08 04 18 19 55 31.3200 -97.3300 251.000 122.0 130.700 2.770 -999.990 -999.990 1.307 ..P WKT 2010 08 04 18 24 55 31.3200 -97.3300 251.000 457.0 119.093 4.670 -999.990 -999.990 1.191 ..P WKT 2010 08 04 18 29 55 31.3200 -97.3300 251.000 30.0 114.516 5.350 -999.990 -999.990 1.145 ..P WKT 2010 08 04 18 34 55 31.3200 -97.3300 251.000 122.0 123.453 4.430 -999.990 -999.990 1.235 ..P WKT 2010 08 04 18 39 55 31.3200 -97.3300 251.000 457.0 118.031 3.180 -999.990 -999.990 1.180 ..P WKT 2010 08 04 18 49 55 31.3200 -97.3300 251.000 30.0 110.882 3.930 -999.990 -999.990 1.109 ..P WKT 2010 08 04 18 54 55 31.3200 -97.3300 251.000 122.0 116.485 5.830 -999.990 -999.990 1.165 ..P WKT 2010 08 04 18 59 55 31.3200 -97.3300 251.000 457.0 113.351 5.200 -999.990 -999.990 1.134 ..P WKT 2010 08 04 19 04 55 31.3200 -97.3300 251.000 30.0 105.987 4.420 -999.990 -999.990 1.060 ..P WKT 2010 08 04 19 09 55 31.3200 -97.3300 251.000 122.0 127.386 3.530 -999.990 -999.990 1.274 ..P WKT 2010 08 04 19 14 55 31.3200 -97.3300 251.000 457.0 121.996 4.050 -999.990 -999.990 1.220 ..P WKT 2010 08 04 19 24 55 31.3200 -97.3300 251.000 30.0 119.030 5.450 -999.990 -999.990 1.190 ..P WKT 2010 08 04 19 29 55 31.3200 -97.3300 251.000 122.0 123.717 4.240 -999.990 -999.990 1.237 ..P WKT 2010 08 04 19 34 55 31.3200 -97.3300 251.000 457.0 114.287 4.470 -999.990 -999.990 1.143 ..P WKT 2010 08 04 19 39 55 31.3200 -97.3300 251.000 30.0 111.631 3.670 -999.990 -999.990 1.116 ..P WKT 2010 08 04 19 44 55 31.3200 -97.3300 251.000 122.0 130.161 3.380 -999.990 -999.990 1.302 ..P WKT 2010 08 04 19 49 55 31.3200 -97.3300 251.000 457.0 116.488 3.370 -999.990 -999.990 1.165 ..P WKT 2010 08 04 19 59 55 31.3200 -97.3300 251.000 30.0 116.826 3.430 -999.990 -999.990 1.168 ..P WKT 2010 08 04 20 04 55 31.3200 -97.3300 251.000 122.0 122.085 4.220 -999.990 -999.990 1.221 ..P WKT 2010 08 04 20 09 55 31.3200 -97.3300 251.000 457.0 118.861 4.610 -999.990 -999.990 1.189 ..P WKT 2010 08 04 20 14 55 31.3200 -97.3300 251.000 30.0 111.959 3.790 -999.990 -999.990 1.120 ..P WKT 2010 08 04 20 19 55 31.3200 -97.3300 251.000 122.0 123.305 3.670 -999.990 -999.990 1.233 ..P WKT 2010 08 04 20 24 55 31.3200 -97.3300 251.000 457.0 115.692 4.050 -999.990 -999.990 1.157 ..P WKT 2010 08 04 20 34 55 31.3200 -97.3300 251.000 30.0 113.017 3.230 -999.990 -999.990 1.130 ..P WKT 2010 08 04 20 39 55 31.3200 -97.3300 251.000 122.0 122.916 3.870 -999.990 -999.990 1.229 ..P WKT 2010 08 04 20 44 55 31.3200 -97.3300 251.000 457.0 114.690 3.290 -999.990 -999.990 1.147 ..P WKT 2010 08 04 20 49 55 31.3200 -97.3300 251.000 30.0 115.244 3.190 -999.990 -999.990 1.152 ..P WKT 2010 08 04 20 54 55 31.3200 -97.3300 251.000 122.0 125.292 3.280 -999.990 -999.990 1.253 ..P WKT 2010 08 04 20 59 55 31.3200 -97.3300 251.000 457.0 114.792 2.970 -999.990 -999.990 1.148 ..P WKT 2010 08 04 21 09 55 31.3200 -97.3300 251.000 30.0 111.444 4.560 -999.990 -999.990 1.114 ..P WKT 2010 08 04 21 14 55 31.3200 -97.3300 251.000 122.0 126.973 4.350 -999.990 -999.990 1.270 ..P WKT 2010 08 04 21 19 55 31.3200 -97.3300 251.000 457.0 120.233 3.310 -999.990 -999.990 1.202 ..P WKT 2010 08 04 21 24 55 31.3200 -97.3300 251.000 30.0 118.175 4.420 -999.990 -999.990 1.182 ..P WKT 2010 08 04 21 29 55 31.3200 -97.3300 251.000 122.0 127.329 3.370 -999.990 -999.990 1.273 ..P WKT 2010 08 04 21 34 55 31.3200 -97.3300 251.000 457.0 110.929 3.560 -999.990 -999.990 1.109 ..P WKT 2010 08 04 21 44 55 31.3200 -97.3300 251.000 30.0 110.028 3.060 -999.990 -999.990 1.100 ..P WKT 2010 08 04 21 49 55 31.3200 -97.3300 251.000 122.0 115.028 3.410 -999.990 -999.990 1.150 ..P WKT 2010 08 04 21 54 55 31.3200 -97.3300 251.000 457.0 111.219 4.030 -999.990 -999.990 1.112 ..P WKT 2010 08 04 21 59 55 31.3200 -97.3300 251.000 30.0 113.520 5.100 -999.990 -999.990 1.135 ..P WKT 2010 08 04 22 04 55 31.3200 -97.3300 251.000 122.0 120.088 4.670 -999.990 -999.990 1.201 ..P WKT 2010 08 04 22 09 55 31.3200 -97.3300 251.000 457.0 111.014 3.500 -999.990 -999.990 1.110 ..P WKT 2010 08 04 22 19 55 31.3200 -97.3300 251.000 30.0 104.644 3.060 -999.990 -999.990 1.046 ..P WKT 2010 08 04 22 24 55 31.3200 -97.3300 251.000 122.0 109.773 4.150 -999.990 -999.990 1.098 ..P WKT 2010 08 04 22 29 55 31.3200 -97.3300 251.000 457.0 105.508 4.390 -999.990 -999.990 1.055 ..P WKT 2010 08 04 22 34 55 31.3200 -97.3300 251.000 30.0 101.527 4.180 -999.990 -999.990 1.015 ..P WKT 2010 08 04 22 39 55 31.3200 -97.3300 251.000 122.0 120.046 3.090 -999.990 -999.990 1.200 ..P WKT 2010 08 04 22 44 55 31.3200 -97.3300 251.000 457.0 106.664 3.080 -999.990 -999.990 1.067 ..P WKT 2010 08 04 22 54 55 31.3200 -97.3300 251.000 30.0 109.810 4.540 -999.990 -999.990 1.098 ..P WKT 2010 08 04 22 59 55 31.3200 -97.3300 251.000 122.0 121.792 3.830 -999.990 -999.990 1.218 ..P WKT 2010 08 04 23 04 55 31.3200 -97.3300 251.000 457.0 110.963 3.530 -999.990 -999.990 1.110 ..P WKT 2010 08 04 23 09 55 31.3200 -97.3300 251.000 30.0 114.107 3.600 -999.990 -999.990 1.141 ..P WKT 2010 08 04 23 14 55 31.3200 -97.3300 251.000 122.0 125.528 3.670 -999.990 -999.990 1.255 ..P WKT 2010 08 04 23 19 55 31.3200 -97.3300 251.000 457.0 119.830 3.820 -999.990 -999.990 1.198 ..P WKT 2010 08 04 23 29 55 31.3200 -97.3300 251.000 30.0 110.959 4.330 -999.990 -999.990 1.110 ..P WKT 2010 08 04 23 34 55 31.3200 -97.3300 251.000 122.0 130.923 5.110 -999.990 -999.990 1.309 ..P WKT 2010 08 04 23 39 55 31.3200 -97.3300 251.000 457.0 126.042 5.090 -999.990 -999.990 1.260 ..P WKT 2010 08 04 23 44 55 31.3200 -97.3300 251.000 30.0 120.301 4.180 -999.990 -999.990 1.203 ..P WKT 2010 08 04 23 49 55 31.3200 -97.3300 251.000 122.0 126.276 4.100 -999.990 -999.990 1.263 ..P WKT 2010 08 05 00 09 55 31.3200 -97.3300 251.000 457.0 113.438 4.220 -999.990 -999.990 1.134 ..P WKT 2010 08 05 00 10 25 31.3200 -97.3300 251.000 457.0 117.355 3.830 -999.990 -999.990 1.174 ..P WKT 2010 08 05 00 10 55 31.3200 -97.3300 251.000 457.0 116.842 3.790 -999.990 -999.990 1.168 ..P WKT 2010 08 05 00 11 25 31.3200 -97.3300 251.000 457.0 120.044 4.050 -999.990 -999.990 1.200 ..P WKT 2010 08 05 00 11 55 31.3200 -97.3300 251.000 457.0 122.389 3.800 -999.990 -999.990 1.224 ..P WKT 2010 08 05 00 12 25 31.3200 -97.3300 251.000 457.0 120.018 3.970 -999.990 -999.990 1.200 ..P WKT 2010 08 05 00 12 55 31.3200 -97.3300 251.000 457.0 116.647 4.210 -999.990 -999.990 1.166 ..P WKT 2010 08 05 00 13 25 31.3200 -97.3300 251.000 457.0 113.990 4.970 -999.990 -999.990 1.140 ..P WKT 2010 08 05 00 13 55 31.3200 -97.3300 251.000 457.0 121.908 3.800 -999.990 -999.990 1.219 ..P WKT 2010 08 05 00 14 25 31.3200 -97.3300 251.000 457.0 119.680 3.800 -999.990 -999.990 1.197 ..P WKT 2010 08 05 00 14 55 31.3200 -97.3300 251.000 457.0 125.168 4.210 -999.990 -999.990 1.252 ..P WKT 2010 08 05 00 19 55 31.3200 -97.3300 251.000 30.0 112.894 5.020 -999.990 -999.990 1.129 ..P WKT 2010 08 05 00 24 55 31.3200 -97.3300 251.000 122.0 121.334 4.290 -999.990 -999.990 1.213 ..P WKT 2010 08 05 00 29 55 31.3200 -97.3300 251.000 457.0 105.498 5.020 -999.990 -999.990 1.055 ..P WKT 2010 08 05 00 34 55 31.3200 -97.3300 251.000 30.0 110.937 4.840 -999.990 -999.990 1.109 ..P WKT 2010 08 05 00 39 55 31.3200 -97.3300 251.000 122.0 116.375 4.140 -999.990 -999.990 1.164 ..P WKT 2010 08 05 00 44 55 31.3200 -97.3300 251.000 457.0 109.111 3.240 -999.990 -999.990 1.091 ..P WKT 2010 08 05 00 54 55 31.3200 -97.3300 251.000 30.0 108.665 3.460 -999.990 -999.990 1.087 ..P WKT 2010 08 05 00 59 55 31.3200 -97.3300 251.000 122.0 106.922 5.020 -999.990 -999.990 1.069 ..P WKT 2010 08 05 01 04 55 31.3200 -97.3300 251.000 457.0 109.170 5.130 -999.990 -999.990 1.092 ..P WKT 2010 08 05 01 09 55 31.3200 -97.3300 251.000 30.0 109.707 5.040 -999.990 -999.990 1.097 ..P WKT 2010 08 05 01 14 55 31.3200 -97.3300 251.000 122.0 107.110 4.820 -999.990 -999.990 1.071 ..P WKT 2010 08 05 01 19 55 31.3200 -97.3300 251.000 457.0 96.963 4.130 -999.990 -999.990 0.970 ..P WKT 2010 08 05 01 29 55 31.3200 -97.3300 251.000 30.0 100.768 4.100 -999.990 -999.990 1.008 ..P WKT 2010 08 05 01 34 55 31.3200 -97.3300 251.000 122.0 102.608 4.010 -999.990 -999.990 1.026 ..P WKT 2010 08 05 01 39 55 31.3200 -97.3300 251.000 457.0 100.747 3.990 -999.990 -999.990 1.007 ..P WKT 2010 08 05 01 44 55 31.3200 -97.3300 251.000 30.0 104.009 4.280 -999.990 -999.990 1.040 ..P WKT 2010 08 05 01 49 55 31.3200 -97.3300 251.000 122.0 111.253 4.060 -999.990 -999.990 1.113 ..P WKT 2010 08 05 01 54 55 31.3200 -97.3300 251.000 457.0 104.413 3.630 -999.990 -999.990 1.044 ..P WKT 2010 08 05 02 04 55 31.3200 -97.3300 251.000 30.0 106.991 3.290 -999.990 -999.990 1.070 ..P WKT 2010 08 05 02 09 55 31.3200 -97.3300 251.000 122.0 106.451 4.730 -999.990 -999.990 1.065 ..P WKT 2010 08 05 02 14 55 31.3200 -97.3300 251.000 457.0 100.511 4.280 -999.990 -999.990 1.005 ..P WKT 2010 08 05 02 19 55 31.3200 -97.3300 251.000 30.0 105.656 5.170 -999.990 -999.990 1.057 ..P WKT 2010 08 05 02 24 55 31.3200 -97.3300 251.000 122.0 109.662 4.460 -999.990 -999.990 1.097 ..P WKT 2010 08 05 02 29 55 31.3200 -97.3300 251.000 457.0 102.589 4.200 -999.990 -999.990 1.026 ..P WKT 2010 08 05 02 39 55 31.3200 -97.3300 251.000 30.0 112.889 3.490 -999.990 -999.990 1.129 ..P WKT 2010 08 05 02 44 55 31.3200 -97.3300 251.000 122.0 108.396 4.360 -999.990 -999.990 1.084 ..P WKT 2010 08 05 02 49 55 31.3200 -97.3300 251.000 457.0 98.229 5.710 -999.990 -999.990 0.982 ..P WKT 2010 08 05 02 54 55 31.3200 -97.3300 251.000 30.0 114.734 5.330 -999.990 -999.990 1.147 ..P WKT 2010 08 05 02 59 55 31.3200 -97.3300 251.000 122.0 104.004 5.240 -999.990 -999.990 1.040 ..P WKT 2010 08 05 03 04 55 31.3200 -97.3300 251.000 457.0 95.547 3.340 -999.990 -999.990 0.955 ..P WKT 2010 08 05 03 14 55 31.3200 -97.3300 251.000 30.0 113.060 3.590 -999.990 -999.990 1.131 ..P WKT 2010 08 05 03 19 55 31.3200 -97.3300 251.000 122.0 110.395 4.200 -999.990 -999.990 1.104 ..P WKT 2010 08 05 03 24 55 31.3200 -97.3300 251.000 457.0 107.449 4.810 -999.990 -999.990 1.074 ..P WKT 2010 08 05 03 29 55 31.3200 -97.3300 251.000 30.0 113.567 3.970 -999.990 -999.990 1.136 ..P WKT 2010 08 05 03 34 55 31.3200 -97.3300 251.000 122.0 108.355 3.810 -999.990 -999.990 1.084 ..P WKT 2010 08 05 03 39 55 31.3200 -97.3300 251.000 457.0 103.429 4.400 -999.990 -999.990 1.034 ..P WKT 2010 08 05 03 49 55 31.3200 -97.3300 251.000 30.0 107.652 4.770 -999.990 -999.990 1.077 ..P WKT 2010 08 05 03 54 55 31.3200 -97.3300 251.000 122.0 109.721 3.380 -999.990 -999.990 1.097 ..P WKT 2010 08 05 03 59 55 31.3200 -97.3300 251.000 457.0 96.658 5.160 -999.990 -999.990 0.967 ..P WKT 2010 08 05 04 04 55 31.3200 -97.3300 251.000 30.0 105.232 3.470 -999.990 -999.990 1.052 ..P WKT 2010 08 05 04 09 55 31.3200 -97.3300 251.000 122.0 108.149 3.580 -999.990 -999.990 1.081 ..P WKT 2010 08 05 04 14 55 31.3200 -97.3300 251.000 457.0 102.726 3.900 -999.990 -999.990 1.027 ..P WKT 2010 08 05 04 24 55 31.3200 -97.3300 251.000 30.0 101.474 3.640 -999.990 -999.990 1.015 ..P WKT 2010 08 05 04 29 55 31.3200 -97.3300 251.000 122.0 103.521 3.730 -999.990 -999.990 1.035 ..P WKT 2010 08 05 04 34 55 31.3200 -97.3300 251.000 457.0 101.190 3.790 -999.990 -999.990 1.012 ..P WKT 2010 08 05 04 39 55 31.3200 -97.3300 251.000 30.0 103.378 4.250 -999.990 -999.990 1.034 ..P WKT 2010 08 05 04 44 55 31.3200 -97.3300 251.000 122.0 105.564 4.710 -999.990 -999.990 1.056 ..P WKT 2010 08 05 04 49 55 31.3200 -97.3300 251.000 457.0 101.259 4.510 -999.990 -999.990 1.013 ..P WKT 2010 08 05 05 04 55 31.3200 -97.3300 251.000 30.0 94.782 4.850 -999.990 -999.990 0.948 ..P WKT 2010 08 05 05 09 55 31.3200 -97.3300 251.000 122.0 97.784 5.580 -999.990 -999.990 0.978 ..P WKT 2010 08 05 05 14 55 31.3200 -97.3300 251.000 457.0 99.516 6.500 -999.990 -999.990 0.995 ..P WKT 2010 08 05 05 19 55 31.3200 -97.3300 251.000 30.0 100.120 4.820 -999.990 -999.990 1.001 ..P WKT 2010 08 05 05 24 55 31.3200 -97.3300 251.000 122.0 99.596 5.870 -999.990 -999.990 0.996 ..P WKT 2010 08 05 05 29 55 31.3200 -97.3300 251.000 457.0 90.904 4.720 -999.990 -999.990 0.909 ..P WKT 2010 08 05 05 39 55 31.3200 -97.3300 251.000 30.0 104.393 5.690 -999.990 -999.990 1.044 ..P WKT 2010 08 05 05 44 55 31.3200 -97.3300 251.000 122.0 108.544 5.040 -999.990 -999.990 1.085 ..P WKT 2010 08 05 05 49 55 31.3200 -97.3300 251.000 457.0 94.117 4.920 -999.990 -999.990 0.941 ..P WKT 2010 08 05 05 54 55 31.3200 -97.3300 251.000 30.0 103.053 4.740 -999.990 -999.990 1.031 ..P WKT 2010 08 05 05 59 55 31.3200 -97.3300 251.000 122.0 115.500 5.030 -999.990 -999.990 1.155 ..P WKT 2010 08 05 06 04 55 31.3200 -97.3300 251.000 457.0 93.769 5.420 -999.990 -999.990 0.938 ..P WKT 2010 08 05 06 14 55 31.3200 -97.3300 251.000 30.0 105.640 4.520 -999.990 -999.990 1.056 ..P WKT 2010 08 05 06 19 55 31.3200 -97.3300 251.000 122.0 119.822 6.580 -999.990 -999.990 1.198 ..P WKT 2010 08 05 06 24 55 31.3200 -97.3300 251.000 457.0 99.716 4.280 -999.990 -999.990 0.997 ..P WKT 2010 08 05 06 29 55 31.3200 -97.3300 251.000 30.0 110.803 4.430 -999.990 -999.990 1.108 ..P WKT 2010 08 05 06 34 55 31.3200 -97.3300 251.000 122.0 112.335 4.430 -999.990 -999.990 1.123 ..P WKT 2010 08 05 06 39 55 31.3200 -97.3300 251.000 457.0 98.141 5.280 -999.990 -999.990 0.981 ..P WKT 2010 08 05 06 49 55 31.3200 -97.3300 251.000 30.0 101.610 4.800 -999.990 -999.990 1.016 ..P WKT 2010 08 05 06 54 55 31.3200 -97.3300 251.000 122.0 113.085 3.940 -999.990 -999.990 1.131 ..P WKT 2010 08 05 06 59 55 31.3200 -97.3300 251.000 457.0 92.010 3.950 -999.990 -999.990 0.920 ..P WKT 2010 08 05 07 04 55 31.3200 -97.3300 251.000 30.0 101.799 5.000 -999.990 -999.990 1.018 ..P WKT 2010 08 05 07 09 55 31.3200 -97.3300 251.000 122.0 107.377 4.850 -999.990 -999.990 1.074 ..P WKT 2010 08 05 07 14 55 31.3200 -97.3300 251.000 457.0 92.205 4.290 -999.990 -999.990 0.922 ..P WKT 2010 08 05 07 24 55 31.3200 -97.3300 251.000 30.0 107.802 5.450 -999.990 -999.990 1.078 ..P WKT 2010 08 05 07 29 55 31.3200 -97.3300 251.000 122.0 110.532 4.570 -999.990 -999.990 1.105 ..P WKT 2010 08 05 07 34 55 31.3200 -97.3300 251.000 457.0 88.609 4.100 -999.990 -999.990 0.886 ..P WKT 2010 08 05 07 39 55 31.3200 -97.3300 251.000 30.0 107.866 4.010 -999.990 -999.990 1.079 ..P WKT 2010 08 05 07 44 55 31.3200 -97.3300 251.000 122.0 117.875 4.040 -999.990 -999.990 1.179 ..P WKT 2010 08 05 07 49 55 31.3200 -97.3300 251.000 457.0 89.247 3.740 -999.990 -999.990 0.892 ..P WKT 2010 08 05 07 59 55 31.3200 -97.3300 251.000 30.0 108.199 3.910 -999.990 -999.990 1.082 ..P WKT 2010 08 05 08 04 55 31.3200 -97.3300 251.000 122.0 120.776 4.300 -999.990 -999.990 1.208 ..P WKT 2010 08 05 08 09 55 31.3200 -97.3300 251.000 457.0 97.966 4.630 -999.990 -999.990 0.980 ..P WKT 2010 08 05 08 14 55 31.3200 -97.3300 251.000 30.0 105.227 5.700 -999.990 -999.990 1.052 ..P WKT 2010 08 05 08 19 55 31.3200 -97.3300 251.000 122.0 122.968 5.420 -999.990 -999.990 1.230 ..P WKT 2010 08 05 08 24 55 31.3200 -97.3300 251.000 457.0 94.304 5.490 -999.990 -999.990 0.943 ..P WKT 2010 08 05 08 34 55 31.3200 -97.3300 251.000 30.0 107.916 5.400 -999.990 -999.990 1.079 ..P WKT 2010 08 05 08 39 55 31.3200 -97.3300 251.000 122.0 108.123 5.540 -999.990 -999.990 1.081 ..P WKT 2010 08 05 08 44 55 31.3200 -97.3300 251.000 457.0 92.274 4.840 -999.990 -999.990 0.923 ..P WKT 2010 08 05 08 49 55 31.3200 -97.3300 251.000 30.0 112.028 4.830 -999.990 -999.990 1.120 ..P WKT 2010 08 05 08 54 55 31.3200 -97.3300 251.000 122.0 114.607 4.490 -999.990 -999.990 1.146 ..P WKT 2010 08 05 08 59 55 31.3200 -97.3300 251.000 457.0 91.372 4.010 -999.990 -999.990 0.914 ..P WKT 2010 08 05 09 09 55 31.3200 -97.3300 251.000 30.0 105.840 4.310 -999.990 -999.990 1.058 ..P WKT 2010 08 05 09 14 55 31.3200 -97.3300 251.000 122.0 104.474 4.170 -999.990 -999.990 1.045 ..P WKT 2010 08 05 09 19 55 31.3200 -97.3300 251.000 457.0 89.029 5.150 -999.990 -999.990 0.890 ..P WKT 2010 08 05 09 24 55 31.3200 -97.3300 251.000 30.0 105.089 4.800 -999.990 -999.990 1.051 ..P WKT 2010 08 05 09 29 55 31.3200 -97.3300 251.000 122.0 106.512 5.740 -999.990 -999.990 1.065 ..P WKT 2010 08 05 09 34 55 31.3200 -97.3300 251.000 457.0 90.101 5.310 -999.990 -999.990 0.901 ..P WKT 2010 08 05 09 44 55 31.3200 -97.3300 251.000 30.0 111.490 5.160 -999.990 -999.990 1.115 ..P WKT 2010 08 05 09 49 55 31.3200 -97.3300 251.000 122.0 109.031 5.030 -999.990 -999.990 1.090 ..P WKT 2010 08 05 09 54 55 31.3200 -97.3300 251.000 457.0 96.273 4.480 -999.990 -999.990 0.963 ..P WKT 2010 08 05 09 59 55 31.3200 -97.3300 251.000 30.0 104.812 4.210 -999.990 -999.990 1.048 ..P WKT 2010 08 05 10 04 55 31.3200 -97.3300 251.000 122.0 103.887 4.110 -999.990 -999.990 1.039 ..P WKT 2010 08 05 10 09 55 31.3200 -97.3300 251.000 457.0 90.721 4.540 -999.990 -999.990 0.907 ..P WKT 2010 08 05 10 19 55 31.3200 -97.3300 251.000 30.0 104.311 3.660 -999.990 -999.990 1.043 ..P WKT 2010 08 05 10 24 55 31.3200 -97.3300 251.000 122.0 96.575 4.100 -999.990 -999.990 0.966 ..P WKT 2010 08 05 10 29 55 31.3200 -97.3300 251.000 457.0 95.791 4.860 -999.990 -999.990 0.958 ..P WKT 2010 08 05 10 34 55 31.3200 -97.3300 251.000 30.0 92.785 6.040 -999.990 -999.990 0.928 ..P WKT 2010 08 05 10 39 55 31.3200 -97.3300 251.000 122.0 94.781 5.120 -999.990 -999.990 0.948 ..P WKT 2010 08 05 10 44 55 31.3200 -97.3300 251.000 457.0 83.722 4.390 -999.990 -999.990 0.837 ..P WKT 2010 08 05 10 54 55 31.3200 -97.3300 251.000 30.0 101.874 4.480 -999.990 -999.990 1.019 ..P WKT 2010 08 05 10 59 55 31.3200 -97.3300 251.000 122.0 90.265 6.040 -999.990 -999.990 0.903 ..P WKT 2010 08 05 11 04 55 31.3200 -97.3300 251.000 457.0 87.541 5.760 -999.990 -999.990 0.875 ..P WKT 2010 08 05 11 09 55 31.3200 -97.3300 251.000 30.0 99.247 5.040 -999.990 -999.990 0.992 ..P WKT 2010 08 05 11 14 55 31.3200 -97.3300 251.000 122.0 94.303 4.340 -999.990 -999.990 0.943 ..P WKT 2010 08 05 11 19 55 31.3200 -97.3300 251.000 457.0 92.135 3.990 -999.990 -999.990 0.921 ..P WKT 2010 08 05 11 29 55 31.3200 -97.3300 251.000 30.0 112.983 4.140 -999.990 -999.990 1.130 ..P WKT 2010 08 05 11 34 55 31.3200 -97.3300 251.000 122.0 103.839 4.450 -999.990 -999.990 1.038 ..P WKT 2010 08 05 11 39 55 31.3200 -97.3300 251.000 457.0 94.423 4.570 -999.990 -999.990 0.944 ..P WKT 2010 08 05 11 44 55 31.3200 -97.3300 251.000 30.0 107.448 4.800 -999.990 -999.990 1.074 ..P WKT 2010 08 05 11 49 55 31.3200 -97.3300 251.000 122.0 104.682 3.920 -999.990 -999.990 1.047 ..P WKT 2010 08 05 12 09 55 31.3200 -97.3300 251.000 457.0 92.358 3.910 -999.990 -999.990 0.924 ..P WKT 2010 08 05 12 10 25 31.3200 -97.3300 251.000 457.0 93.002 4.280 -999.990 -999.990 0.930 ..P WKT 2010 08 05 12 10 55 31.3200 -97.3300 251.000 457.0 93.370 4.260 -999.990 -999.990 0.934 ..P WKT 2010 08 05 12 11 25 31.3200 -97.3300 251.000 457.0 89.446 4.050 -999.990 -999.990 0.894 ..P WKT 2010 08 05 12 11 55 31.3200 -97.3300 251.000 457.0 93.274 3.780 -999.990 -999.990 0.933 ..P WKT 2010 08 05 12 12 25 31.3200 -97.3300 251.000 457.0 91.427 3.640 -999.990 -999.990 0.914 ..P WKT 2010 08 05 12 12 55 31.3200 -97.3300 251.000 457.0 91.379 3.800 -999.990 -999.990 0.914 ..P WKT 2010 08 05 12 13 25 31.3200 -97.3300 251.000 457.0 90.501 4.790 -999.990 -999.990 0.905 ..P WKT 2010 08 05 12 13 55 31.3200 -97.3300 251.000 457.0 90.315 4.380 -999.990 -999.990 0.903 ..P WKT 2010 08 05 12 14 25 31.3200 -97.3300 251.000 457.0 91.098 3.670 -999.990 -999.990 0.911 ..P WKT 2010 08 05 12 14 55 31.3200 -97.3300 251.000 457.0 92.712 3.650 -999.990 -999.990 0.927 ..P WKT 2010 08 05 12 19 55 31.3200 -97.3300 251.000 30.0 109.402 3.960 -999.990 -999.990 1.094 ..P WKT 2010 08 05 12 24 55 31.3200 -97.3300 251.000 122.0 103.665 5.800 -999.990 -999.990 1.037 ..P WKT 2010 08 05 12 29 55 31.3200 -97.3300 251.000 457.0 96.820 3.870 -999.990 -999.990 0.968 ..P WKT 2010 08 05 12 34 55 31.3200 -97.3300 251.000 30.0 105.760 3.930 -999.990 -999.990 1.058 ..P WKT 2010 08 05 12 39 55 31.3200 -97.3300 251.000 122.0 103.068 4.550 -999.990 -999.990 1.031 ..P WKT 2010 08 05 12 44 55 31.3200 -97.3300 251.000 457.0 92.761 4.210 -999.990 -999.990 0.928 ..P WKT 2010 08 05 12 54 55 31.3200 -97.3300 251.000 30.0 111.831 5.100 -999.990 -999.990 1.118 ..P WKT 2010 08 05 12 59 55 31.3200 -97.3300 251.000 122.0 105.620 4.280 -999.990 -999.990 1.056 ..P WKT 2010 08 05 13 04 55 31.3200 -97.3300 251.000 457.0 83.342 5.410 -999.990 -999.990 0.833 ..P WKT 2010 08 05 13 09 55 31.3200 -97.3300 251.000 30.0 114.109 5.990 -999.990 -999.990 1.141 ..P WKT 2010 08 05 13 14 55 31.3200 -97.3300 251.000 122.0 103.604 5.220 -999.990 -999.990 1.036 ..P WKT 2010 08 05 13 19 55 31.3200 -97.3300 251.000 457.0 87.280 4.320 -999.990 -999.990 0.873 ..P WKT 2010 08 05 13 29 55 31.3200 -97.3300 251.000 30.0 107.030 4.280 -999.990 -999.990 1.070 ..P WKT 2010 08 05 13 34 55 31.3200 -97.3300 251.000 122.0 108.199 5.860 -999.990 -999.990 1.082 ..P WKT 2010 08 05 13 39 55 31.3200 -97.3300 251.000 457.0 90.804 5.630 -999.990 -999.990 0.908 ..P WKT 2010 08 05 13 44 55 31.3200 -97.3300 251.000 30.0 114.001 5.970 -999.990 -999.990 1.140 ..P WKT 2010 08 05 13 49 55 31.3200 -97.3300 251.000 122.0 111.845 5.750 -999.990 -999.990 1.118 ..P WKT 2010 08 05 13 54 55 31.3200 -97.3300 251.000 457.0 92.091 5.430 -999.990 -999.990 0.921 ..P WKT 2010 08 05 14 04 55 31.3200 -97.3300 251.000 30.0 105.712 4.850 -999.990 -999.990 1.057 ..P WKT 2010 08 05 14 09 55 31.3200 -97.3300 251.000 122.0 110.543 5.550 -999.990 -999.990 1.105 ..P WKT 2010 08 05 14 14 55 31.3200 -97.3300 251.000 457.0 88.490 6.690 -999.990 -999.990 0.885 ..P WKT 2010 08 05 14 19 55 31.3200 -97.3300 251.000 30.0 103.853 6.230 -999.990 -999.990 1.039 ..P WKT 2010 08 05 14 24 55 31.3200 -97.3300 251.000 122.0 104.250 5.720 -999.990 -999.990 1.042 ..P WKT 2010 08 05 14 29 55 31.3200 -97.3300 251.000 457.0 94.113 5.110 -999.990 -999.990 0.941 ..P WKT 2010 08 05 14 39 55 31.3200 -97.3300 251.000 30.0 96.134 4.490 -999.990 -999.990 0.961 ..P WKT 2010 08 05 14 44 55 31.3200 -97.3300 251.000 122.0 99.699 4.380 -999.990 -999.990 0.997 ..P WKT 2010 08 05 14 49 55 31.3200 -97.3300 251.000 457.0 98.551 4.380 -999.990 -999.990 0.986 ..P WKT 2010 08 05 14 54 55 31.3200 -97.3300 251.000 30.0 90.749 4.410 -999.990 -999.990 0.907 ..P WKT 2010 08 05 14 59 55 31.3200 -97.3300 251.000 122.0 103.464 5.040 -999.990 -999.990 1.035 ..P WKT 2010 08 05 15 04 55 31.3200 -97.3300 251.000 457.0 83.738 4.850 -999.990 -999.990 0.837 ..P WKT 2010 08 05 15 14 55 31.3200 -97.3300 251.000 30.0 95.246 3.940 -999.990 -999.990 0.952 ..P WKT 2010 08 05 15 19 55 31.3200 -97.3300 251.000 122.0 103.745 4.220 -999.990 -999.990 1.037 ..P WKT 2010 08 05 15 24 55 31.3200 -97.3300 251.000 457.0 88.394 4.760 -999.990 -999.990 0.884 ..P WKT 2010 08 05 15 29 55 31.3200 -97.3300 251.000 30.0 97.170 4.000 -999.990 -999.990 0.972 ..P WKT 2010 08 05 15 34 55 31.3200 -97.3300 251.000 122.0 105.947 4.140 -999.990 -999.990 1.059 ..P WKT 2010 08 05 15 39 55 31.3200 -97.3300 251.000 457.0 87.265 4.090 -999.990 -999.990 0.873 ..P WKT 2010 08 05 15 49 55 31.3200 -97.3300 251.000 30.0 92.773 4.160 -999.990 -999.990 0.928 ..P WKT 2010 08 05 15 54 55 31.3200 -97.3300 251.000 122.0 105.595 4.080 -999.990 -999.990 1.056 ..P WKT 2010 08 05 15 59 55 31.3200 -97.3300 251.000 457.0 93.726 4.810 -999.990 -999.990 0.937 ..P WKT 2010 08 05 16 04 55 31.3200 -97.3300 251.000 30.0 98.641 5.160 -999.990 -999.990 0.986 ..P WKT 2010 08 05 16 09 55 31.3200 -97.3300 251.000 122.0 107.857 4.950 -999.990 -999.990 1.079 ..P WKT 2010 08 05 16 14 55 31.3200 -97.3300 251.000 457.0 91.964 4.240 -999.990 -999.990 0.920 ..P WKT 2010 08 05 16 24 55 31.3200 -97.3300 251.000 30.0 97.534 4.390 -999.990 -999.990 0.975 ..P WKT 2010 08 05 16 29 55 31.3200 -97.3300 251.000 122.0 116.781 5.040 -999.990 -999.990 1.168 ..P WKT 2010 08 05 16 34 55 31.3200 -97.3300 251.000 457.0 107.169 4.970 -999.990 -999.990 1.072 ..P WKT 2010 08 05 16 39 55 31.3200 -97.3300 251.000 30.0 111.293 5.290 -999.990 -999.990 1.113 ..P WKT 2010 08 05 16 44 55 31.3200 -97.3300 251.000 122.0 118.332 5.050 -999.990 -999.990 1.183 ..P WKT 2010 08 05 16 49 55 31.3200 -97.3300 251.000 457.0 107.747 5.710 -999.990 -999.990 1.077 ..P WKT 2010 08 05 17 04 55 31.3200 -97.3300 251.000 30.0 101.083 4.860 -999.990 -999.990 1.011 ..P WKT 2010 08 05 17 09 55 31.3200 -97.3300 251.000 122.0 113.594 5.500 -999.990 -999.990 1.136 ..P WKT 2010 08 05 17 14 55 31.3200 -97.3300 251.000 457.0 101.397 5.730 -999.990 -999.990 1.014 ..P WKT 2010 08 05 17 19 55 31.3200 -97.3300 251.000 30.0 103.220 5.310 -999.990 -999.990 1.032 ..P WKT 2010 08 05 17 24 55 31.3200 -97.3300 251.000 122.0 114.344 4.520 -999.990 -999.990 1.143 ..P WKT 2010 08 05 17 29 55 31.3200 -97.3300 251.000 457.0 102.007 4.760 -999.990 -999.990 1.020 ..P WKT 2010 08 05 17 39 55 31.3200 -97.3300 251.000 30.0 102.780 4.130 -999.990 -999.990 1.028 ..P WKT 2010 08 05 17 44 55 31.3200 -97.3300 251.000 122.0 112.698 4.100 -999.990 -999.990 1.127 ..P WKT 2010 08 05 17 49 55 31.3200 -97.3300 251.000 457.0 102.345 4.600 -999.990 -999.990 1.023 ..P WKT 2010 08 05 17 54 55 31.3200 -97.3300 251.000 30.0 102.683 5.870 -999.990 -999.990 1.027 ..P WKT 2010 08 05 17 59 55 31.3200 -97.3300 251.000 122.0 112.187 6.030 -999.990 -999.990 1.122 ..P WKT 2010 08 05 18 04 55 31.3200 -97.3300 251.000 457.0 100.860 4.490 -999.990 -999.990 1.009 ..P WKT 2010 08 05 18 14 55 31.3200 -97.3300 251.000 30.0 95.802 4.370 -999.990 -999.990 0.958 ..P WKT 2010 08 05 18 19 55 31.3200 -97.3300 251.000 122.0 100.962 4.820 -999.990 -999.990 1.010 ..P WKT 2010 08 05 18 24 55 31.3200 -97.3300 251.000 457.0 93.342 5.460 -999.990 -999.990 0.933 ..P WKT 2010 08 05 18 29 55 31.3200 -97.3300 251.000 30.0 90.446 5.120 -999.990 -999.990 0.904 ..P WKT 2010 08 05 18 34 55 31.3200 -97.3300 251.000 122.0 103.940 4.850 -999.990 -999.990 1.039 ..P WKT 2010 08 05 18 39 55 31.3200 -97.3300 251.000 457.0 95.209 4.500 -999.990 -999.990 0.952 ..P WKT 2010 08 05 18 49 55 31.3200 -97.3300 251.000 30.0 98.465 4.870 -999.990 -999.990 0.985 ..P WKT 2010 08 05 18 54 55 31.3200 -97.3300 251.000 122.0 111.010 4.780 -999.990 -999.990 1.110 ..P WKT 2010 08 05 18 59 55 31.3200 -97.3300 251.000 457.0 100.491 5.010 -999.990 -999.990 1.005 ..P WKT 2010 08 05 19 04 55 31.3200 -97.3300 251.000 30.0 103.588 5.290 -999.990 -999.990 1.036 ..P WKT 2010 08 05 19 09 55 31.3200 -97.3300 251.000 122.0 110.299 4.670 -999.990 -999.990 1.103 ..P WKT 2010 08 05 19 14 55 31.3200 -97.3300 251.000 457.0 102.557 4.470 -999.990 -999.990 1.026 ..P WKT 2010 08 05 19 24 55 31.3200 -97.3300 251.000 30.0 92.275 4.070 -999.990 -999.990 0.923 ..P WKT 2010 08 05 19 29 55 31.3200 -97.3300 251.000 122.0 107.246 4.130 -999.990 -999.990 1.072 ..P WKT 2010 08 05 19 34 55 31.3200 -97.3300 251.000 457.0 102.204 4.690 -999.990 -999.990 1.022 ..P WKT 2010 08 05 19 39 55 31.3200 -97.3300 251.000 30.0 95.772 4.660 -999.990 -999.990 0.958 ..P WKT 2010 08 05 19 44 55 31.3200 -97.3300 251.000 122.0 109.910 5.120 -999.990 -999.990 1.099 ..P WKT 2010 08 05 19 49 55 31.3200 -97.3300 251.000 457.0 104.729 4.740 -999.990 -999.990 1.047 ..P WKT 2010 08 05 19 59 55 31.3200 -97.3300 251.000 30.0 102.388 4.180 -999.990 -999.990 1.024 ..P WKT 2010 08 05 20 04 55 31.3200 -97.3300 251.000 122.0 110.928 5.210 -999.990 -999.990 1.109 ..P WKT 2010 08 05 20 09 55 31.3200 -97.3300 251.000 457.0 100.979 4.280 -999.990 -999.990 1.010 ..P WKT 2010 08 05 20 14 55 31.3200 -97.3300 251.000 30.0 103.820 4.330 -999.990 -999.990 1.038 ..P WKT 2010 08 05 20 19 55 31.3200 -97.3300 251.000 122.0 111.944 4.490 -999.990 -999.990 1.119 ..P WKT 2010 08 05 20 24 55 31.3200 -97.3300 251.000 457.0 105.331 4.640 -999.990 -999.990 1.053 ..P WKT 2010 08 05 20 34 55 31.3200 -97.3300 251.000 30.0 95.579 4.580 -999.990 -999.990 0.956 ..P WKT 2010 08 05 20 39 55 31.3200 -97.3300 251.000 122.0 112.744 4.550 -999.990 -999.990 1.127 ..P WKT 2010 08 05 20 44 55 31.3200 -97.3300 251.000 457.0 99.732 4.320 -999.990 -999.990 0.997 ..P WKT 2010 08 05 20 49 55 31.3200 -97.3300 251.000 30.0 99.514 4.820 -999.990 -999.990 0.995 ..P WKT 2010 08 05 20 54 55 31.3200 -97.3300 251.000 122.0 112.231 4.760 -999.990 -999.990 1.122 ..P WKT 2010 08 05 20 59 55 31.3200 -97.3300 251.000 457.0 104.920 4.390 -999.990 -999.990 1.049 ..P WKT 2010 08 05 21 09 55 31.3200 -97.3300 251.000 30.0 100.968 4.570 -999.990 -999.990 1.010 ..P WKT 2010 08 05 21 14 55 31.3200 -97.3300 251.000 122.0 115.178 4.530 -999.990 -999.990 1.152 ..P WKT 2010 08 05 21 19 55 31.3200 -97.3300 251.000 457.0 107.965 6.050 -999.990 -999.990 1.080 ..P WKT 2010 08 05 21 24 55 31.3200 -97.3300 251.000 30.0 97.691 6.110 -999.990 -999.990 0.977 ..P WKT 2010 08 05 21 29 55 31.3200 -97.3300 251.000 122.0 110.372 5.490 -999.990 -999.990 1.104 ..P WKT 2010 08 05 21 34 55 31.3200 -97.3300 251.000 457.0 100.654 4.720 -999.990 -999.990 1.007 ..P WKT 2010 08 05 21 44 55 31.3200 -97.3300 251.000 30.0 98.648 4.570 -999.990 -999.990 0.986 ..P WKT 2010 08 05 21 49 55 31.3200 -97.3300 251.000 122.0 114.711 5.360 -999.990 -999.990 1.147 ..P WKT 2010 08 05 21 54 55 31.3200 -97.3300 251.000 457.0 104.613 6.850 -999.990 -999.990 1.046 ..P WKT 2010 08 05 21 59 55 31.3200 -97.3300 251.000 30.0 99.524 5.210 -999.990 -999.990 0.995 ..P WKT 2010 08 05 22 04 55 31.3200 -97.3300 251.000 122.0 104.734 4.830 -999.990 -999.990 1.047 ..P WKT 2010 08 05 22 09 55 31.3200 -97.3300 251.000 457.0 105.491 4.680 -999.990 -999.990 1.055 ..P WKT 2010 08 05 22 19 55 31.3200 -97.3300 251.000 30.0 101.118 4.560 -999.990 -999.990 1.011 ..P WKT 2010 08 05 22 24 55 31.3200 -97.3300 251.000 122.0 110.465 4.900 -999.990 -999.990 1.105 ..P WKT 2010 08 05 22 29 55 31.3200 -97.3300 251.000 457.0 94.478 5.390 -999.990 -999.990 0.945 ..P WKT 2010 08 05 22 34 55 31.3200 -97.3300 251.000 30.0 101.320 6.410 -999.990 -999.990 1.013 ..P WKT 2010 08 05 22 39 55 31.3200 -97.3300 251.000 122.0 103.429 5.890 -999.990 -999.990 1.034 ..P WKT 2010 08 05 22 44 55 31.3200 -97.3300 251.000 457.0 94.679 4.760 -999.990 -999.990 0.947 ..P WKT 2010 08 05 22 54 55 31.3200 -97.3300 251.000 30.0 87.679 4.690 -999.990 -999.990 0.877 ..P WKT 2010 08 05 22 59 55 31.3200 -97.3300 251.000 122.0 107.530 5.700 -999.990 -999.990 1.075 ..P WKT 2010 08 05 23 04 55 31.3200 -97.3300 251.000 457.0 98.142 6.370 -999.990 -999.990 0.981 ..P WKT 2010 08 05 23 09 55 31.3200 -97.3300 251.000 30.0 94.323 5.950 -999.990 -999.990 0.943 ..P WKT 2010 08 05 23 14 55 31.3200 -97.3300 251.000 122.0 108.329 4.900 -999.990 -999.990 1.083 ..P WKT 2010 08 05 23 19 55 31.3200 -97.3300 251.000 457.0 99.776 4.930 -999.990 -999.990 0.998 ..P WKT 2010 08 05 23 29 55 31.3200 -97.3300 251.000 30.0 95.086 5.040 -999.990 -999.990 0.951 ..P WKT 2010 08 05 23 34 55 31.3200 -97.3300 251.000 122.0 105.637 5.230 -999.990 -999.990 1.056 ..P WKT 2010 08 05 23 39 55 31.3200 -97.3300 251.000 457.0 96.132 5.640 -999.990 -999.990 0.961 ..P WKT 2010 08 05 23 44 55 31.3200 -97.3300 251.000 30.0 96.934 5.960 -999.990 -999.990 0.969 ..P WKT 2010 08 05 23 49 55 31.3200 -97.3300 251.000 122.0 107.068 5.810 -999.990 -999.990 1.071 ..P WKT 2010 08 06 00 09 55 31.3200 -97.3300 251.000 457.0 100.325 6.800 -999.990 -999.990 1.003 ..P WKT 2010 08 06 00 10 25 31.3200 -97.3300 251.000 457.0 97.889 6.140 -999.990 -999.990 0.979 ..P WKT 2010 08 06 00 10 55 31.3200 -97.3300 251.000 457.0 103.953 5.780 -999.990 -999.990 1.040 ..P WKT 2010 08 06 00 11 25 31.3200 -97.3300 251.000 457.0 103.468 5.840 -999.990 -999.990 1.035 ..P WKT 2010 08 06 00 11 55 31.3200 -97.3300 251.000 457.0 100.475 5.610 -999.990 -999.990 1.005 ..P WKT 2010 08 06 00 12 25 31.3200 -97.3300 251.000 457.0 97.064 5.980 -999.990 -999.990 0.971 ..P WKT 2010 08 06 00 12 55 31.3200 -97.3300 251.000 457.0 104.659 6.830 -999.990 -999.990 1.047 ..P WKT 2010 08 06 00 13 25 31.3200 -97.3300 251.000 457.0 105.567 6.040 -999.990 -999.990 1.056 ..P WKT 2010 08 06 00 13 55 31.3200 -97.3300 251.000 457.0 98.117 5.850 -999.990 -999.990 0.981 ..P WKT 2010 08 06 00 14 25 31.3200 -97.3300 251.000 457.0 100.558 5.710 -999.990 -999.990 1.006 ..P WKT 2010 08 06 00 14 55 31.3200 -97.3300 251.000 457.0 102.580 5.460 -999.990 -999.990 1.026 ..P WKT 2010 08 06 00 19 55 31.3200 -97.3300 251.000 30.0 98.008 5.420 -999.990 -999.990 0.980 ..P WKT 2010 08 06 00 24 55 31.3200 -97.3300 251.000 122.0 100.403 6.050 -999.990 -999.990 1.004 ..P WKT 2010 08 06 00 29 55 31.3200 -97.3300 251.000 457.0 93.044 5.120 -999.990 -999.990 0.930 ..P WKT 2010 08 06 00 34 55 31.3200 -97.3300 251.000 30.0 89.865 4.750 -999.990 -999.990 0.899 ..P WKT 2010 08 06 00 39 55 31.3200 -97.3300 251.000 122.0 100.619 4.710 -999.990 -999.990 1.006 ..P WKT 2010 08 06 00 44 55 31.3200 -97.3300 251.000 457.0 88.523 5.370 -999.990 -999.990 0.885 ..P WKT 2010 08 06 00 54 55 31.3200 -97.3300 251.000 30.0 88.101 4.340 -999.990 -999.990 0.881 ..P WKT 2010 08 06 00 59 55 31.3200 -97.3300 251.000 122.0 100.193 4.470 -999.990 -999.990 1.002 ..P WKT 2010 08 06 01 04 55 31.3200 -97.3300 251.000 457.0 94.311 4.800 -999.990 -999.990 0.943 ..P WKT 2010 08 06 01 09 55 31.3200 -97.3300 251.000 30.0 107.100 4.640 -999.990 -999.990 1.071 ..P WKT 2010 08 06 01 14 55 31.3200 -97.3300 251.000 122.0 101.915 4.550 -999.990 -999.990 1.019 ..P WKT 2010 08 06 01 19 55 31.3200 -97.3300 251.000 457.0 93.107 5.030 -999.990 -999.990 0.931 ..P WKT 2010 08 06 01 29 55 31.3200 -97.3300 251.000 30.0 102.662 4.570 -999.990 -999.990 1.027 ..P WKT 2010 08 06 01 34 55 31.3200 -97.3300 251.000 122.0 103.330 4.870 -999.990 -999.990 1.033 ..P WKT 2010 08 06 01 39 55 31.3200 -97.3300 251.000 457.0 98.005 4.420 -999.990 -999.990 0.980 ..P WKT 2010 08 06 01 44 55 31.3200 -97.3300 251.000 30.0 98.254 4.570 -999.990 -999.990 0.983 ..P WKT 2010 08 06 01 49 55 31.3200 -97.3300 251.000 122.0 103.798 4.260 -999.990 -999.990 1.038 ..P WKT 2010 08 06 01 54 55 31.3200 -97.3300 251.000 457.0 104.606 4.310 -999.990 -999.990 1.046 ..P WKT 2010 08 06 02 04 55 31.3200 -97.3300 251.000 30.0 103.153 4.800 -999.990 -999.990 1.032 ..P WKT 2010 08 06 02 09 55 31.3200 -97.3300 251.000 122.0 110.927 4.410 -999.990 -999.990 1.109 ..P WKT 2010 08 06 02 14 55 31.3200 -97.3300 251.000 457.0 100.585 4.920 -999.990 -999.990 1.006 ..P WKT 2010 08 06 02 19 55 31.3200 -97.3300 251.000 30.0 97.489 4.590 -999.990 -999.990 0.975 ..P WKT 2010 08 06 02 24 55 31.3200 -97.3300 251.000 122.0 108.330 4.780 -999.990 -999.990 1.083 ..P WKT 2010 08 06 02 29 55 31.3200 -97.3300 251.000 457.0 96.315 4.140 -999.990 -999.990 0.963 ..P WKT 2010 08 06 02 39 55 31.3200 -97.3300 251.000 30.0 99.521 4.270 -999.990 -999.990 0.995 ..P WKT 2010 08 06 02 44 55 31.3200 -97.3300 251.000 122.0 105.823 4.720 -999.990 -999.990 1.058 ..P WKT 2010 08 06 02 49 55 31.3200 -97.3300 251.000 457.0 95.958 4.690 -999.990 -999.990 0.960 ..P WKT 2010 08 06 02 54 55 31.3200 -97.3300 251.000 30.0 100.866 4.460 -999.990 -999.990 1.009 ..P WKT 2010 08 06 02 59 55 31.3200 -97.3300 251.000 122.0 96.018 4.570 -999.990 -999.990 0.960 ..P WKT 2010 08 06 03 04 55 31.3200 -97.3300 251.000 457.0 96.744 4.890 -999.990 -999.990 0.967 ..P WKT 2010 08 06 03 14 55 31.3200 -97.3300 251.000 30.0 105.028 4.860 -999.990 -999.990 1.050 ..P WKT 2010 08 06 03 19 55 31.3200 -97.3300 251.000 122.0 101.992 4.850 -999.990 -999.990 1.020 ..P WKT 2010 08 06 03 24 55 31.3200 -97.3300 251.000 457.0 92.544 4.790 -999.990 -999.990 0.925 ..P WKT 2010 08 06 03 29 55 31.3200 -97.3300 251.000 30.0 110.974 4.800 -999.990 -999.990 1.110 ..P WKT 2010 08 06 03 34 55 31.3200 -97.3300 251.000 122.0 96.786 4.750 -999.990 -999.990 0.968 ..P WKT 2010 08 06 03 39 55 31.3200 -97.3300 251.000 457.0 96.119 4.810 -999.990 -999.990 0.961 ..P WKT 2010 08 06 03 49 55 31.3200 -97.3300 251.000 30.0 93.690 5.920 -999.990 -999.990 0.937 ..P WKT 2010 08 06 03 54 55 31.3200 -97.3300 251.000 122.0 103.638 4.390 -999.990 -999.990 1.036 ..P WKT 2010 08 06 03 59 55 31.3200 -97.3300 251.000 457.0 89.329 4.610 -999.990 -999.990 0.893 ..P WKT 2010 08 06 04 04 55 31.3200 -97.3300 251.000 30.0 98.858 5.100 -999.990 -999.990 0.989 ..P WKT 2010 08 06 04 09 55 31.3200 -97.3300 251.000 122.0 107.412 4.200 -999.990 -999.990 1.074 ..P WKT 2010 08 06 04 14 55 31.3200 -97.3300 251.000 457.0 90.594 4.610 -999.990 -999.990 0.906 ..P WKT 2010 08 06 04 24 55 31.3200 -97.3300 251.000 30.0 106.308 4.130 -999.990 -999.990 1.063 ..P WKT 2010 08 06 04 29 55 31.3200 -97.3300 251.000 122.0 105.521 4.460 -999.990 -999.990 1.055 ..P WKT 2010 08 06 04 34 55 31.3200 -97.3300 251.000 457.0 103.062 3.850 -999.990 -999.990 1.031 ..P WKT 2010 08 06 04 39 55 31.3200 -97.3300 251.000 30.0 99.766 3.920 -999.990 -999.990 0.998 ..P WKT 2010 08 06 04 44 55 31.3200 -97.3300 251.000 122.0 106.787 3.730 -999.990 -999.990 1.068 ..P WKT 2010 08 06 04 49 55 31.3200 -97.3300 251.000 457.0 94.568 4.030 -999.990 -999.990 0.946 ..P WKT 2010 08 06 05 04 55 31.3200 -97.3300 251.000 30.0 101.331 3.890 -999.990 -999.990 1.013 ..P WKT 2010 08 06 05 09 55 31.3200 -97.3300 251.000 122.0 100.923 4.040 -999.990 -999.990 1.009 ..P WKT 2010 08 06 05 14 55 31.3200 -97.3300 251.000 457.0 87.966 4.420 -999.990 -999.990 0.880 ..P WKT 2010 08 06 05 19 55 31.3200 -97.3300 251.000 30.0 106.102 4.120 -999.990 -999.990 1.061 ..P WKT 2010 08 06 05 24 55 31.3200 -97.3300 251.000 122.0 101.650 3.870 -999.990 -999.990 1.017 ..P WKT 2010 08 06 05 29 55 31.3200 -97.3300 251.000 457.0 89.669 3.820 -999.990 -999.990 0.897 ..P WKT 2010 08 06 05 39 55 31.3200 -97.3300 251.000 30.0 100.326 4.310 -999.990 -999.990 1.003 ..P WKT 2010 08 06 05 44 55 31.3200 -97.3300 251.000 122.0 97.588 4.010 -999.990 -999.990 0.976 ..P WKT 2010 08 06 05 49 55 31.3200 -97.3300 251.000 457.0 88.992 3.900 -999.990 -999.990 0.890 ..P WKT 2010 08 06 05 54 55 31.3200 -97.3300 251.000 30.0 96.573 3.870 -999.990 -999.990 0.966 ..P WKT 2010 08 06 05 59 55 31.3200 -97.3300 251.000 122.0 93.555 3.850 -999.990 -999.990 0.936 ..P WKT 2010 08 06 06 04 55 31.3200 -97.3300 251.000 457.0 86.632 3.930 -999.990 -999.990 0.866 ..P WKT 2010 08 06 06 14 55 31.3200 -97.3300 251.000 30.0 102.511 3.880 -999.990 -999.990 1.025 ..P WKT 2010 08 06 06 19 55 31.3200 -97.3300 251.000 122.0 99.373 4.650 -999.990 -999.990 0.994 ..P WKT 2010 08 06 06 24 55 31.3200 -97.3300 251.000 457.0 88.704 4.570 -999.990 -999.990 0.887 ..P WKT 2010 08 06 06 29 55 31.3200 -97.3300 251.000 30.0 100.071 4.060 -999.990 -999.990 1.001 ..P WKT 2010 08 06 06 34 55 31.3200 -97.3300 251.000 122.0 94.980 4.570 -999.990 -999.990 0.950 ..P WKT 2010 08 06 06 39 55 31.3200 -97.3300 251.000 457.0 92.401 4.280 -999.990 -999.990 0.924 ..P WKT 2010 08 06 06 49 55 31.3200 -97.3300 251.000 30.0 102.343 4.050 -999.990 -999.990 1.023 ..P WKT 2010 08 06 06 54 55 31.3200 -97.3300 251.000 122.0 98.688 4.390 -999.990 -999.990 0.987 ..P WKT 2010 08 06 06 59 55 31.3200 -97.3300 251.000 457.0 88.616 3.800 -999.990 -999.990 0.886 ..P WKT 2010 08 06 07 04 55 31.3200 -97.3300 251.000 30.0 92.770 3.820 -999.990 -999.990 0.928 ..P WKT 2010 08 06 07 09 55 31.3200 -97.3300 251.000 122.0 93.578 4.210 -999.990 -999.990 0.936 ..P WKT 2010 08 06 07 14 55 31.3200 -97.3300 251.000 457.0 84.063 3.690 -999.990 -999.990 0.841 ..P WKT 2010 08 06 07 24 55 31.3200 -97.3300 251.000 30.0 95.222 3.740 -999.990 -999.990 0.952 ..P WKT 2010 08 06 07 29 55 31.3200 -97.3300 251.000 122.0 105.016 3.840 -999.990 -999.990 1.050 ..P WKT 2010 08 06 07 34 55 31.3200 -97.3300 251.000 457.0 79.241 4.760 -999.990 -999.990 0.792 ..P WKT 2010 08 06 07 39 55 31.3200 -97.3300 251.000 30.0 91.964 7.210 -999.990 -999.990 0.920 ..P WKT 2010 08 06 07 44 55 31.3200 -97.3300 251.000 122.0 101.061 5.300 -999.990 -999.990 1.011 ..P WKT 2010 08 06 07 49 55 31.3200 -97.3300 251.000 457.0 81.005 4.640 -999.990 -999.990 0.810 ..P WKT 2010 08 06 07 59 55 31.3200 -97.3300 251.000 30.0 92.543 4.060 -999.990 -999.990 0.925 ..P WKT 2010 08 06 08 04 55 31.3200 -97.3300 251.000 122.0 102.936 5.670 -999.990 -999.990 1.029 ..P WKT 2010 08 06 08 09 55 31.3200 -97.3300 251.000 457.0 82.639 5.680 -999.990 -999.990 0.826 ..P WKT 2010 08 06 08 14 55 31.3200 -97.3300 251.000 30.0 92.892 5.170 -999.990 -999.990 0.929 ..P WKT 2010 08 06 08 19 55 31.3200 -97.3300 251.000 122.0 105.378 5.150 -999.990 -999.990 1.054 ..P WKT 2010 08 06 08 24 55 31.3200 -97.3300 251.000 457.0 86.755 4.720 -999.990 -999.990 0.868 ..P WKT 2010 08 06 08 34 55 31.3200 -97.3300 251.000 30.0 102.280 5.230 -999.990 -999.990 1.023 ..P WKT 2010 08 06 08 39 55 31.3200 -97.3300 251.000 122.0 108.668 5.270 -999.990 -999.990 1.087 ..P WKT 2010 08 06 08 44 55 31.3200 -97.3300 251.000 457.0 84.364 4.320 -999.990 -999.990 0.844 ..P WKT 2010 08 06 08 49 55 31.3200 -97.3300 251.000 30.0 104.843 4.000 -999.990 -999.990 1.048 ..P WKT 2010 08 06 08 54 55 31.3200 -97.3300 251.000 122.0 103.976 3.840 -999.990 -999.990 1.040 ..P WKT 2010 08 06 08 59 55 31.3200 -97.3300 251.000 457.0 85.112 4.300 -999.990 -999.990 0.851 ..P WKT 2010 08 06 09 09 55 31.3200 -97.3300 251.000 30.0 96.851 4.020 -999.990 -999.990 0.969 ..P WKT 2010 08 06 09 14 55 31.3200 -97.3300 251.000 122.0 97.599 3.480 -999.990 -999.990 0.976 ..P WKT 2010 08 06 09 19 55 31.3200 -97.3300 251.000 457.0 80.487 3.720 -999.990 -999.990 0.805 ..P WKT 2010 08 06 09 24 55 31.3200 -97.3300 251.000 30.0 101.466 3.550 -999.990 -999.990 1.015 ..P WKT 2010 08 06 09 29 55 31.3200 -97.3300 251.000 122.0 101.656 4.550 -999.990 -999.990 1.017 ..P WKT 2010 08 06 09 34 55 31.3200 -97.3300 251.000 457.0 84.264 3.840 -999.990 -999.990 0.843 ..P WKT 2010 08 06 09 44 55 31.3200 -97.3300 251.000 30.0 93.294 3.630 -999.990 -999.990 0.933 ..P WKT 2010 08 06 09 49 55 31.3200 -97.3300 251.000 122.0 94.461 3.500 -999.990 -999.990 0.945 ..P WKT 2010 08 06 09 54 55 31.3200 -97.3300 251.000 457.0 86.138 4.500 -999.990 -999.990 0.861 ..P WKT 2010 08 06 09 59 55 31.3200 -97.3300 251.000 30.0 92.328 4.600 -999.990 -999.990 0.923 ..P WKT 2010 08 06 10 04 55 31.3200 -97.3300 251.000 122.0 90.704 4.090 -999.990 -999.990 0.907 ..P WKT 2010 08 06 10 09 55 31.3200 -97.3300 251.000 457.0 89.637 4.330 -999.990 -999.990 0.896 ..P WKT 2010 08 06 10 19 55 31.3200 -97.3300 251.000 30.0 100.941 4.120 -999.990 -999.990 1.009 ..P WKT 2010 08 06 10 24 55 31.3200 -97.3300 251.000 122.0 100.752 3.980 -999.990 -999.990 1.008 ..P WKT 2010 08 06 10 29 55 31.3200 -97.3300 251.000 457.0 93.306 4.700 -999.990 -999.990 0.933 ..P WKT 2010 08 06 10 34 55 31.3200 -97.3300 251.000 30.0 100.095 5.940 -999.990 -999.990 1.001 ..P WKT 2010 08 06 10 39 55 31.3200 -97.3300 251.000 122.0 108.558 4.710 -999.990 -999.990 1.086 ..P WKT 2010 08 06 10 44 55 31.3200 -97.3300 251.000 457.0 89.111 3.900 -999.990 -999.990 0.891 ..P WKT 2010 08 06 10 54 55 31.3200 -97.3300 251.000 30.0 105.559 4.610 -999.990 -999.990 1.056 ..P WKT 2010 08 06 10 59 55 31.3200 -97.3300 251.000 122.0 113.545 4.720 -999.990 -999.990 1.135 ..P WKT 2010 08 06 11 04 55 31.3200 -97.3300 251.000 457.0 82.173 5.260 -999.990 -999.990 0.822 ..P WKT 2010 08 06 11 09 55 31.3200 -97.3300 251.000 30.0 97.974 4.460 -999.990 -999.990 0.980 ..P WKT 2010 08 06 11 14 55 31.3200 -97.3300 251.000 122.0 109.309 4.560 -999.990 -999.990 1.093 ..P WKT 2010 08 06 11 19 55 31.3200 -97.3300 251.000 457.0 76.262 4.330 -999.990 -999.990 0.763 ..P WKT 2010 08 06 11 29 55 31.3200 -97.3300 251.000 30.0 100.500 3.920 -999.990 -999.990 1.005 ..P WKT 2010 08 06 11 34 55 31.3200 -97.3300 251.000 122.0 103.074 3.660 -999.990 -999.990 1.031 ..P WKT 2010 08 06 11 39 55 31.3200 -97.3300 251.000 457.0 76.758 3.890 -999.990 -999.990 0.768 ..P WKT 2010 08 06 11 44 55 31.3200 -97.3300 251.000 30.0 100.966 3.920 -999.990 -999.990 1.010 ..P WKT 2010 08 06 11 49 55 31.3200 -97.3300 251.000 122.0 103.123 3.580 -999.990 -999.990 1.031 ..P WKT 2010 08 06 12 09 55 31.3200 -97.3300 251.000 457.0 79.182 3.490 -999.990 -999.990 0.792 ..P WKT 2010 08 06 12 10 25 31.3200 -97.3300 251.000 457.0 79.940 3.520 -999.990 -999.990 0.799 ..P WKT 2010 08 06 12 10 55 31.3200 -97.3300 251.000 457.0 76.230 4.190 -999.990 -999.990 0.762 ..P WKT 2010 08 06 12 11 25 31.3200 -97.3300 251.000 457.0 84.247 4.410 -999.990 -999.990 0.842 ..P WKT 2010 08 06 12 11 55 31.3200 -97.3300 251.000 457.0 79.280 3.400 -999.990 -999.990 0.793 ..P WKT 2010 08 06 12 12 25 31.3200 -97.3300 251.000 457.0 76.827 3.550 -999.990 -999.990 0.768 ..P WKT 2010 08 06 12 12 55 31.3200 -97.3300 251.000 457.0 77.584 3.700 -999.990 -999.990 0.776 ..P WKT 2010 08 06 12 13 25 31.3200 -97.3300 251.000 457.0 82.110 3.570 -999.990 -999.990 0.821 ..P WKT 2010 08 06 12 13 55 31.3200 -97.3300 251.000 457.0 84.822 3.690 -999.990 -999.990 0.848 ..P WKT 2010 08 06 12 14 25 31.3200 -97.3300 251.000 457.0 74.551 5.920 -999.990 -999.990 0.746 ..P WKT 2010 08 06 12 14 55 31.3200 -97.3300 251.000 457.0 75.866 4.120 -999.990 -999.990 0.759 ..P WKT 2010 08 06 12 19 55 31.3200 -97.3300 251.000 30.0 98.518 4.490 -999.990 -999.990 0.985 ..P WKT 2010 08 06 12 24 55 31.3200 -97.3300 251.000 122.0 95.621 4.380 -999.990 -999.990 0.956 ..P WKT 2010 08 06 12 29 55 31.3200 -97.3300 251.000 457.0 79.599 4.920 -999.990 -999.990 0.796 ..P WKT 2010 08 06 12 34 55 31.3200 -97.3300 251.000 30.0 99.322 4.430 -999.990 -999.990 0.993 ..P WKT 2010 08 06 12 39 55 31.3200 -97.3300 251.000 122.0 95.866 4.490 -999.990 -999.990 0.959 ..P WKT 2010 08 06 12 44 55 31.3200 -97.3300 251.000 457.0 74.675 5.740 -999.990 -999.990 0.747 ..P WKT 2010 08 06 12 54 55 31.3200 -97.3300 251.000 30.0 95.282 3.880 -999.990 -999.990 0.953 ..P WKT 2010 08 06 12 59 55 31.3200 -97.3300 251.000 122.0 93.371 4.240 -999.990 -999.990 0.934 ..P WKT 2010 08 06 13 04 55 31.3200 -97.3300 251.000 457.0 76.794 4.830 -999.990 -999.990 0.768 ..P WKT 2010 08 06 13 09 55 31.3200 -97.3300 251.000 30.0 94.297 5.370 -999.990 -999.990 0.943 ..P WKT 2010 08 06 13 14 55 31.3200 -97.3300 251.000 122.0 101.325 4.010 -999.990 -999.990 1.013 ..P WKT 2010 08 06 13 19 55 31.3200 -97.3300 251.000 457.0 85.165 4.270 -999.990 -999.990 0.852 ..P WKT 2010 08 06 13 29 55 31.3200 -97.3300 251.000 30.0 100.500 4.330 -999.990 -999.990 1.005 ..P WKT 2010 08 06 13 34 55 31.3200 -97.3300 251.000 122.0 106.572 4.550 -999.990 -999.990 1.066 ..P WKT 2010 08 06 13 39 55 31.3200 -97.3300 251.000 457.0 86.377 4.100 -999.990 -999.990 0.864 ..P WKT 2010 08 06 13 44 55 31.3200 -97.3300 251.000 30.0 105.303 6.030 -999.990 -999.990 1.053 ..P WKT 2010 08 06 13 49 55 31.3200 -97.3300 251.000 122.0 112.215 4.470 -999.990 -999.990 1.122 ..P WKT 2010 08 06 13 54 55 31.3200 -97.3300 251.000 457.0 86.148 4.150 -999.990 -999.990 0.861 ..P WKT 2010 08 06 14 04 55 31.3200 -97.3300 251.000 30.0 100.930 3.530 -999.990 -999.990 1.009 ..P WKT 2010 08 06 14 09 55 31.3200 -97.3300 251.000 122.0 110.198 4.730 -999.990 -999.990 1.102 ..P WKT 2010 08 06 14 14 55 31.3200 -97.3300 251.000 457.0 82.569 5.240 -999.990 -999.990 0.826 ..P WKT 2010 08 06 14 19 55 31.3200 -97.3300 251.000 30.0 106.375 4.460 -999.990 -999.990 1.064 ..P WKT 2010 08 06 14 24 55 31.3200 -97.3300 251.000 122.0 112.849 4.610 -999.990 -999.990 1.128 ..P WKT 2010 08 06 14 29 55 31.3200 -97.3300 251.000 457.0 75.990 3.940 -999.990 -999.990 0.760 ..P WKT 2010 08 06 14 39 55 31.3200 -97.3300 251.000 30.0 99.244 3.990 -999.990 -999.990 0.992 ..P WKT 2010 08 06 14 44 55 31.3200 -97.3300 251.000 122.0 115.186 4.560 -999.990 -999.990 1.152 ..P WKT 2010 08 06 14 49 55 31.3200 -97.3300 251.000 457.0 78.000 5.530 -999.990 -999.990 0.780 ..P WKT 2010 08 06 14 54 55 31.3200 -97.3300 251.000 30.0 100.935 4.200 -999.990 -999.990 1.009 ..P WKT 2010 08 06 14 59 55 31.3200 -97.3300 251.000 122.0 114.921 4.450 -999.990 -999.990 1.149 ..P WKT 2010 08 06 15 04 55 31.3200 -97.3300 251.000 457.0 83.603 3.870 -999.990 -999.990 0.836 ..P WKT 2010 08 06 15 14 55 31.3200 -97.3300 251.000 30.0 96.657 4.170 -999.990 -999.990 0.967 ..P WKT 2010 08 06 15 19 55 31.3200 -97.3300 251.000 122.0 103.833 5.560 -999.990 -999.990 1.038 ..P WKT 2010 08 06 15 24 55 31.3200 -97.3300 251.000 457.0 98.144 3.990 -999.990 -999.990 0.981 ..P WKT 2010 08 06 15 29 55 31.3200 -97.3300 251.000 30.0 96.649 4.260 -999.990 -999.990 0.966 ..P WKT 2010 08 06 15 34 55 31.3200 -97.3300 251.000 122.0 110.122 6.070 -999.990 -999.990 1.101 ..P WKT 2010 08 06 15 39 55 31.3200 -97.3300 251.000 457.0 95.618 4.380 -999.990 -999.990 0.956 ..P WKT 2010 08 06 15 49 55 31.3200 -97.3300 251.000 30.0 100.743 4.060 -999.990 -999.990 1.007 ..P WKT 2010 08 06 15 54 55 31.3200 -97.3300 251.000 122.0 112.819 4.050 -999.990 -999.990 1.128 ..P WKT 2010 08 06 15 59 55 31.3200 -97.3300 251.000 457.0 104.609 4.000 -999.990 -999.990 1.046 ..P WKT 2010 08 06 16 04 55 31.3200 -97.3300 251.000 30.0 105.073 4.970 -999.990 -999.990 1.051 ..P WKT 2010 08 06 16 09 55 31.3200 -97.3300 251.000 122.0 112.394 4.350 -999.990 -999.990 1.124 ..P WKT 2010 08 06 16 14 55 31.3200 -97.3300 251.000 457.0 108.240 3.430 -999.990 -999.990 1.082 ..P WKT 2010 08 06 16 24 55 31.3200 -97.3300 251.000 30.0 104.911 4.710 -999.990 -999.990 1.049 ..P WKT 2010 08 06 16 29 55 31.3200 -97.3300 251.000 122.0 118.052 3.830 -999.990 -999.990 1.181 ..P WKT 2010 08 06 16 34 55 31.3200 -97.3300 251.000 457.0 112.858 4.180 -999.990 -999.990 1.129 ..P WKT 2010 08 06 16 39 55 31.3200 -97.3300 251.000 30.0 102.626 5.040 -999.990 -999.990 1.026 ..P WKT 2010 08 06 16 44 55 31.3200 -97.3300 251.000 122.0 112.129 3.980 -999.990 -999.990 1.121 ..P WKT 2010 08 06 16 49 55 31.3200 -97.3300 251.000 457.0 103.295 3.650 -999.990 -999.990 1.033 ..P WKT 2010 08 06 17 04 55 31.3200 -97.3300 251.000 30.0 96.884 4.070 -999.990 -999.990 0.969 ..P WKT 2010 08 06 17 09 55 31.3200 -97.3300 251.000 122.0 116.156 4.810 -999.990 -999.990 1.162 ..P WKT 2010 08 06 17 14 55 31.3200 -97.3300 251.000 457.0 98.747 4.120 -999.990 -999.990 0.987 ..P WKT 2010 08 06 17 19 55 31.3200 -97.3300 251.000 30.0 101.360 3.900 -999.990 -999.990 1.014 ..P WKT 2010 08 06 17 24 55 31.3200 -97.3300 251.000 122.0 111.533 3.510 -999.990 -999.990 1.115 ..P WKT 2010 08 06 17 29 55 31.3200 -97.3300 251.000 457.0 102.804 3.590 -999.990 -999.990 1.028 ..P WKT 2010 08 06 17 39 55 31.3200 -97.3300 251.000 30.0 99.639 3.300 -999.990 -999.990 0.996 ..P WKT 2010 08 06 17 44 55 31.3200 -97.3300 251.000 122.0 116.410 3.530 -999.990 -999.990 1.164 ..P WKT 2010 08 06 17 49 55 31.3200 -97.3300 251.000 457.0 103.489 3.790 -999.990 -999.990 1.035 ..P WKT 2010 08 06 17 54 55 31.3200 -97.3300 251.000 30.0 93.369 3.710 -999.990 -999.990 0.934 ..P WKT 2010 08 06 17 59 55 31.3200 -97.3300 251.000 122.0 113.503 3.350 -999.990 -999.990 1.135 ..P WKT 2010 08 06 18 04 55 31.3200 -97.3300 251.000 457.0 100.861 3.460 -999.990 -999.990 1.009 ..P WKT 2010 08 06 18 14 55 31.3200 -97.3300 251.000 30.0 101.991 3.560 -999.990 -999.990 1.020 ..P WKT 2010 08 06 18 19 55 31.3200 -97.3300 251.000 122.0 116.886 3.370 -999.990 -999.990 1.169 ..P WKT 2010 08 06 18 24 55 31.3200 -97.3300 251.000 457.0 99.558 3.780 -999.990 -999.990 0.996 ..P WKT 2010 08 06 18 29 55 31.3200 -97.3300 251.000 30.0 108.009 4.130 -999.990 -999.990 1.080 ..P WKT 2010 08 06 18 34 55 31.3200 -97.3300 251.000 122.0 117.302 3.550 -999.990 -999.990 1.173 ..P WKT 2010 08 06 18 39 55 31.3200 -97.3300 251.000 457.0 106.137 4.500 -999.990 -999.990 1.061 ..P WKT 2010 08 06 18 49 55 31.3200 -97.3300 251.000 30.0 107.808 4.880 -999.990 -999.990 1.078 ..P WKT 2010 08 06 18 54 55 31.3200 -97.3300 251.000 122.0 116.722 4.090 -999.990 -999.990 1.167 ..P WKT 2010 08 06 18 59 55 31.3200 -97.3300 251.000 457.0 107.977 4.530 -999.990 -999.990 1.080 ..P WKT 2010 08 06 19 04 55 31.3200 -97.3300 251.000 30.0 104.558 5.430 -999.990 -999.990 1.046 ..P WKT 2010 08 06 19 09 55 31.3200 -97.3300 251.000 122.0 117.959 5.750 -999.990 -999.990 1.180 ..P WKT 2010 08 06 19 14 55 31.3200 -97.3300 251.000 457.0 105.849 6.120 -999.990 -999.990 1.058 ..P WKT 2010 08 06 19 24 55 31.3200 -97.3300 251.000 30.0 103.395 5.860 -999.990 -999.990 1.034 ..P WKT 2010 08 06 19 29 55 31.3200 -97.3300 251.000 122.0 122.586 5.430 -999.990 -999.990 1.226 ..P WKT 2010 08 06 19 34 55 31.3200 -97.3300 251.000 457.0 108.131 5.690 -999.990 -999.990 1.081 ..P WKT 2010 08 06 19 39 55 31.3200 -97.3300 251.000 30.0 115.126 4.680 -999.990 -999.990 1.151 ..P WKT 2010 08 06 19 44 55 31.3200 -97.3300 251.000 122.0 123.805 4.240 -999.990 -999.990 1.238 ..P WKT 2010 08 06 19 49 55 31.3200 -97.3300 251.000 457.0 111.731 4.390 -999.990 -999.990 1.117 ..P WKT 2010 08 06 19 59 55 31.3200 -97.3300 251.000 30.0 104.208 4.110 -999.990 -999.990 1.042 ..P WKT 2010 08 06 20 04 55 31.3200 -97.3300 251.000 122.0 124.468 3.760 -999.990 -999.990 1.245 ..P WKT 2010 08 06 20 09 55 31.3200 -97.3300 251.000 457.0 104.618 3.830 -999.990 -999.990 1.046 ..P WKT 2010 08 06 20 14 55 31.3200 -97.3300 251.000 30.0 99.212 3.790 -999.990 -999.990 0.992 ..P WKT 2010 08 06 20 19 55 31.3200 -97.3300 251.000 122.0 111.901 4.200 -999.990 -999.990 1.119 ..P WKT 2010 08 06 20 24 55 31.3200 -97.3300 251.000 457.0 99.903 4.070 -999.990 -999.990 0.999 ..P WKT 2010 08 06 20 34 55 31.3200 -97.3300 251.000 30.0 95.622 4.240 -999.990 -999.990 0.956 ..P WKT 2010 08 06 20 39 55 31.3200 -97.3300 251.000 122.0 113.023 4.210 -999.990 -999.990 1.130 ..P WKT 2010 08 06 20 44 55 31.3200 -97.3300 251.000 457.0 95.491 4.150 -999.990 -999.990 0.955 ..P WKT 2010 08 06 20 49 55 31.3200 -97.3300 251.000 30.0 97.179 4.820 -999.990 -999.990 0.972 ..P WKT 2010 08 06 20 54 55 31.3200 -97.3300 251.000 122.0 110.653 5.290 -999.990 -999.990 1.107 ..P WKT 2010 08 06 20 59 55 31.3200 -97.3300 251.000 457.0 100.414 6.110 -999.990 -999.990 1.004 ..P WKT 2010 08 06 21 09 55 31.3200 -97.3300 251.000 30.0 98.138 5.900 -999.990 -999.990 0.981 ..P WKT 2010 08 06 21 14 55 31.3200 -97.3300 251.000 122.0 107.926 5.810 -999.990 -999.990 1.079 ..P WKT 2010 08 06 21 19 55 31.3200 -97.3300 251.000 457.0 103.960 5.380 -999.990 -999.990 1.040 ..P WKT 2010 08 06 21 24 55 31.3200 -97.3300 251.000 30.0 100.696 6.550 -999.990 -999.990 1.007 ..P WKT 2010 08 06 21 29 55 31.3200 -97.3300 251.000 122.0 109.504 5.800 -999.990 -999.990 1.095 ..P WKT 2010 08 06 21 34 55 31.3200 -97.3300 251.000 457.0 106.520 6.070 -999.990 -999.990 1.065 ..P WKT 2010 08 06 21 44 55 31.3200 -97.3300 251.000 30.0 102.819 4.710 -999.990 -999.990 1.028 ..P WKT 2010 08 06 21 49 55 31.3200 -97.3300 251.000 122.0 114.737 6.050 -999.990 -999.990 1.147 ..P WKT 2010 08 06 21 54 55 31.3200 -97.3300 251.000 457.0 98.015 6.590 -999.990 -999.990 0.980 ..P WKT 2010 08 06 21 59 55 31.3200 -97.3300 251.000 30.0 99.544 5.580 -999.990 -999.990 0.995 ..P WKT 2010 08 06 22 04 55 31.3200 -97.3300 251.000 122.0 110.620 5.060 -999.990 -999.990 1.106 ..P WKT 2010 08 06 22 09 55 31.3200 -97.3300 251.000 457.0 96.985 4.050 -999.990 -999.990 0.970 ..P WKT 2010 08 06 22 19 55 31.3200 -97.3300 251.000 30.0 98.438 3.970 -999.990 -999.990 0.984 ..P WKT 2010 08 06 22 24 55 31.3200 -97.3300 251.000 122.0 109.597 4.100 -999.990 -999.990 1.096 ..P WKT 2010 08 06 22 29 55 31.3200 -97.3300 251.000 457.0 100.814 4.890 -999.990 -999.990 1.008 ..P WKT 2010 08 06 22 34 55 31.3200 -97.3300 251.000 30.0 97.929 4.290 -999.990 -999.990 0.979 ..P WKT 2010 08 06 22 39 55 31.3200 -97.3300 251.000 122.0 117.798 4.020 -999.990 -999.990 1.178 ..P WKT 2010 08 06 22 44 55 31.3200 -97.3300 251.000 457.0 105.924 4.050 -999.990 -999.990 1.059 ..P WKT 2010 08 06 22 54 55 31.3200 -97.3300 251.000 30.0 108.421 4.020 -999.990 -999.990 1.084 ..P WKT 2010 08 06 22 59 55 31.3200 -97.3300 251.000 122.0 115.491 4.180 -999.990 -999.990 1.155 ..P WKT 2010 08 06 23 04 55 31.3200 -97.3300 251.000 457.0 105.421 4.300 -999.990 -999.990 1.054 ..P WKT 2010 08 06 23 09 55 31.3200 -97.3300 251.000 30.0 102.375 3.900 -999.990 -999.990 1.024 ..P WKT 2010 08 06 23 14 55 31.3200 -97.3300 251.000 122.0 111.973 4.040 -999.990 -999.990 1.120 ..P WKT 2010 08 06 23 19 55 31.3200 -97.3300 251.000 457.0 103.026 4.520 -999.990 -999.990 1.030 ..P WKT 2010 08 06 23 29 55 31.3200 -97.3300 251.000 30.0 102.899 4.030 -999.990 -999.990 1.029 ..P WKT 2010 08 06 23 34 55 31.3200 -97.3300 251.000 122.0 107.647 4.000 -999.990 -999.990 1.076 ..P WKT 2010 08 06 23 39 55 31.3200 -97.3300 251.000 457.0 101.854 4.110 -999.990 -999.990 1.019 ..P WKT 2010 08 06 23 44 55 31.3200 -97.3300 251.000 30.0 100.419 6.650 -999.990 -999.990 1.004 ..P WKT 2010 08 06 23 49 55 31.3200 -97.3300 251.000 122.0 112.616 4.160 -999.990 -999.990 1.126 ..P WKT 2010 08 07 00 09 55 31.3200 -97.3300 251.000 457.0 103.058 4.070 -999.990 -999.990 1.031 ..P WKT 2010 08 07 00 10 25 31.3200 -97.3300 251.000 457.0 102.870 3.650 -999.990 -999.990 1.029 ..P WKT 2010 08 07 00 10 55 31.3200 -97.3300 251.000 457.0 106.759 3.660 -999.990 -999.990 1.068 ..P WKT 2010 08 07 00 11 25 31.3200 -97.3300 251.000 457.0 108.961 4.040 -999.990 -999.990 1.090 ..P WKT 2010 08 07 00 11 55 31.3200 -97.3300 251.000 457.0 102.587 3.450 -999.990 -999.990 1.026 ..P WKT 2010 08 07 00 12 25 31.3200 -97.3300 251.000 457.0 98.181 4.340 -999.990 -999.990 0.982 ..P WKT 2010 08 07 00 12 55 31.3200 -97.3300 251.000 457.0 98.837 3.780 -999.990 -999.990 0.988 ..P WKT 2010 08 07 00 13 25 31.3200 -97.3300 251.000 457.0 97.945 3.650 -999.990 -999.990 0.979 ..P WKT 2010 08 07 00 13 55 31.3200 -97.3300 251.000 457.0 100.288 3.900 -999.990 -999.990 1.003 ..P WKT 2010 08 07 00 14 25 31.3200 -97.3300 251.000 457.0 101.224 5.800 -999.990 -999.990 1.012 ..P WKT 2010 08 07 00 14 55 31.3200 -97.3300 251.000 457.0 105.113 6.220 -999.990 -999.990 1.051 ..P WKT 2010 08 07 00 19 55 31.3200 -97.3300 251.000 30.0 100.138 3.990 -999.990 -999.990 1.001 ..P WKT 2010 08 07 00 24 55 31.3200 -97.3300 251.000 122.0 107.817 4.270 -999.990 -999.990 1.078 ..P WKT 2010 08 07 00 29 55 31.3200 -97.3300 251.000 457.0 96.935 4.240 -999.990 -999.990 0.969 ..P WKT 2010 08 07 00 34 55 31.3200 -97.3300 251.000 30.0 94.912 3.940 -999.990 -999.990 0.949 ..P WKT 2010 08 07 00 39 55 31.3200 -97.3300 251.000 122.0 109.343 3.600 -999.990 -999.990 1.093 ..P WKT 2010 08 07 00 44 55 31.3200 -97.3300 251.000 457.0 101.975 3.270 -999.990 -999.990 1.020 ..P WKT 2010 08 07 00 54 55 31.3200 -97.3300 251.000 30.0 112.419 3.930 -999.990 -999.990 1.124 ..P WKT 2010 08 07 00 59 55 31.3200 -97.3300 251.000 122.0 115.322 3.700 -999.990 -999.990 1.153 ..P WKT 2010 08 07 01 04 55 31.3200 -97.3300 251.000 457.0 106.547 4.250 -999.990 -999.990 1.065 ..P WKT 2010 08 07 01 09 55 31.3200 -97.3300 251.000 30.0 111.280 5.360 -999.990 -999.990 1.113 ..P WKT 2010 08 07 01 14 55 31.3200 -97.3300 251.000 122.0 111.650 4.580 -999.990 -999.990 1.117 ..P WKT 2010 08 07 01 19 55 31.3200 -97.3300 251.000 457.0 107.236 5.320 -999.990 -999.990 1.072 ..P WKT 2010 08 07 01 29 55 31.3200 -97.3300 251.000 30.0 108.078 4.820 -999.990 -999.990 1.081 ..P WKT 2010 08 07 01 34 55 31.3200 -97.3300 251.000 122.0 115.727 4.400 -999.990 -999.990 1.157 ..P WKT 2010 08 07 01 39 55 31.3200 -97.3300 251.000 457.0 99.167 4.530 -999.990 -999.990 0.992 ..P WKT 2010 08 07 01 44 55 31.3200 -97.3300 251.000 30.0 115.825 4.560 -999.990 -999.990 1.158 ..P WKT 2010 08 07 01 49 55 31.3200 -97.3300 251.000 122.0 112.215 4.570 -999.990 -999.990 1.122 ..P WKT 2010 08 07 01 54 55 31.3200 -97.3300 251.000 457.0 113.108 3.660 -999.990 -999.990 1.131 ..P WKT 2010 08 07 02 04 55 31.3200 -97.3300 251.000 30.0 108.460 4.280 -999.990 -999.990 1.085 ..P WKT 2010 08 07 02 09 55 31.3200 -97.3300 251.000 122.0 106.859 4.760 -999.990 -999.990 1.069 ..P WKT 2010 08 07 02 14 55 31.3200 -97.3300 251.000 457.0 102.723 5.660 -999.990 -999.990 1.027 ..P WKT 2010 08 07 02 19 55 31.3200 -97.3300 251.000 30.0 98.869 7.810 -999.990 -999.990 0.989 ..P WKT 2010 08 07 02 24 55 31.3200 -97.3300 251.000 122.0 101.492 6.310 -999.990 -999.990 1.015 ..P WKT 2010 08 07 02 29 55 31.3200 -97.3300 251.000 457.0 100.454 4.340 -999.990 -999.990 1.005 ..P WKT 2010 08 07 02 39 55 31.3200 -97.3300 251.000 30.0 97.814 4.390 -999.990 -999.990 0.978 ..P WKT 2010 08 07 02 44 55 31.3200 -97.3300 251.000 122.0 101.283 6.070 -999.990 -999.990 1.013 ..P WKT 2010 08 07 02 49 55 31.3200 -97.3300 251.000 457.0 99.681 7.020 -999.990 -999.990 0.997 ..P WKT 2010 08 07 02 54 55 31.3200 -97.3300 251.000 30.0 98.924 5.820 -999.990 -999.990 0.989 ..P WKT 2010 08 07 02 59 55 31.3200 -97.3300 251.000 122.0 106.059 5.590 -999.990 -999.990 1.061 ..P WKT 2010 08 07 03 04 55 31.3200 -97.3300 251.000 457.0 103.611 3.720 -999.990 -999.990 1.036 ..P WKT 2010 08 07 03 14 55 31.3200 -97.3300 251.000 30.0 106.104 4.270 -999.990 -999.990 1.061 ..P WKT 2010 08 07 03 19 55 31.3200 -97.3300 251.000 122.0 113.019 5.020 -999.990 -999.990 1.130 ..P WKT 2010 08 07 03 24 55 31.3200 -97.3300 251.000 457.0 108.517 6.190 -999.990 -999.990 1.085 ..P WKT 2010 08 07 03 29 55 31.3200 -97.3300 251.000 30.0 110.781 4.660 -999.990 -999.990 1.108 ..P WKT 2010 08 07 03 34 55 31.3200 -97.3300 251.000 122.0 118.967 3.730 -999.990 -999.990 1.190 ..P WKT 2010 08 07 03 39 55 31.3200 -97.3300 251.000 457.0 107.133 3.360 -999.990 -999.990 1.071 ..P WKT 2010 08 07 03 49 55 31.3200 -97.3300 251.000 30.0 103.604 3.210 -999.990 -999.990 1.036 ..P WKT 2010 08 07 03 54 55 31.3200 -97.3300 251.000 122.0 97.247 4.050 -999.990 -999.990 0.972 ..P WKT 2010 08 07 03 59 55 31.3200 -97.3300 251.000 457.0 106.966 4.550 -999.990 -999.990 1.070 ..P WKT 2010 08 07 04 04 55 31.3200 -97.3300 251.000 30.0 107.941 4.200 -999.990 -999.990 1.079 ..P WKT 2010 08 07 04 09 55 31.3200 -97.3300 251.000 122.0 109.905 4.290 -999.990 -999.990 1.099 ..P WKT 2010 08 07 04 14 55 31.3200 -97.3300 251.000 457.0 105.943 4.060 -999.990 -999.990 1.059 ..P WKT 2010 08 07 04 24 55 31.3200 -97.3300 251.000 30.0 111.019 4.040 -999.990 -999.990 1.110 ..P WKT 2010 08 07 04 29 55 31.3200 -97.3300 251.000 122.0 110.745 3.890 -999.990 -999.990 1.107 ..P WKT 2010 08 07 04 34 55 31.3200 -97.3300 251.000 457.0 109.767 4.420 -999.990 -999.990 1.098 ..P WKT 2010 08 07 04 39 55 31.3200 -97.3300 251.000 30.0 101.309 3.490 -999.990 -999.990 1.013 ..P WKT 2010 08 07 04 44 55 31.3200 -97.3300 251.000 122.0 103.151 3.930 -999.990 -999.990 1.032 ..P WKT 2010 08 07 04 49 55 31.3200 -97.3300 251.000 457.0 95.539 3.510 -999.990 -999.990 0.955 ..P WKT 2010 08 07 05 04 55 31.3200 -97.3300 251.000 30.0 102.232 4.540 -999.990 -999.990 1.022 ..P WKT 2010 08 07 05 09 55 31.3200 -97.3300 251.000 122.0 97.458 3.610 -999.990 -999.990 0.975 ..P WKT 2010 08 07 05 14 55 31.3200 -97.3300 251.000 457.0 97.060 3.640 -999.990 -999.990 0.971 ..P WKT 2010 08 07 05 19 55 31.3200 -97.3300 251.000 30.0 114.452 3.760 -999.990 -999.990 1.145 ..P WKT 2010 08 07 05 24 55 31.3200 -97.3300 251.000 122.0 114.337 4.040 -999.990 -999.990 1.143 ..P WKT 2010 08 07 05 29 55 31.3200 -97.3300 251.000 457.0 93.606 3.690 -999.990 -999.990 0.936 ..P WKT 2010 08 07 05 39 55 31.3200 -97.3300 251.000 30.0 129.732 3.920 -999.990 -999.990 1.297 ..P WKT 2010 08 07 05 44 55 31.3200 -97.3300 251.000 122.0 110.051 4.070 -999.990 -999.990 1.101 ..P WKT 2010 08 07 05 49 55 31.3200 -97.3300 251.000 457.0 90.649 3.940 -999.990 -999.990 0.906 ..P WKT 2010 08 07 05 54 55 31.3200 -97.3300 251.000 30.0 117.575 4.020 -999.990 -999.990 1.176 ..P WKT 2010 08 07 05 59 55 31.3200 -97.3300 251.000 122.0 106.929 4.080 -999.990 -999.990 1.069 ..P WKT 2010 08 07 06 04 55 31.3200 -97.3300 251.000 457.0 92.043 4.160 -999.990 -999.990 0.920 ..P WKT 2010 08 07 06 14 55 31.3200 -97.3300 251.000 30.0 109.780 4.020 -999.990 -999.990 1.098 ..P WKT 2010 08 07 06 19 55 31.3200 -97.3300 251.000 122.0 101.715 3.690 -999.990 -999.990 1.017 ..P WKT 2010 08 07 06 24 55 31.3200 -97.3300 251.000 457.0 94.213 3.690 -999.990 -999.990 0.942 ..P WKT 2010 08 07 06 29 55 31.3200 -97.3300 251.000 30.0 115.823 4.770 -999.990 -999.990 1.158 ..P WKT 2010 08 07 06 34 55 31.3200 -97.3300 251.000 122.0 101.820 3.190 -999.990 -999.990 1.018 ..P WKT 2010 08 07 06 39 55 31.3200 -97.3300 251.000 457.0 93.468 3.030 -999.990 -999.990 0.935 ..P WKT 2010 08 07 06 49 55 31.3200 -97.3300 251.000 30.0 104.914 3.680 -999.990 -999.990 1.049 ..P WKT 2010 08 07 06 54 55 31.3200 -97.3300 251.000 122.0 101.247 3.350 -999.990 -999.990 1.012 ..P WKT 2010 08 07 06 59 55 31.3200 -97.3300 251.000 457.0 79.765 3.140 -999.990 -999.990 0.798 ..P WKT 2010 08 07 07 04 55 31.3200 -97.3300 251.000 30.0 106.071 3.020 -999.990 -999.990 1.061 ..P WKT 2010 08 07 07 09 55 31.3200 -97.3300 251.000 122.0 106.362 3.080 -999.990 -999.990 1.064 ..P WKT 2010 08 07 07 14 55 31.3200 -97.3300 251.000 457.0 83.321 3.030 -999.990 -999.990 0.833 ..P WKT 2010 08 07 07 24 55 31.3200 -97.3300 251.000 30.0 108.650 3.350 -999.990 -999.990 1.087 ..P WKT 2010 08 07 07 29 55 31.3200 -97.3300 251.000 122.0 106.820 3.810 -999.990 -999.990 1.068 ..P WKT 2010 08 07 07 34 55 31.3200 -97.3300 251.000 457.0 84.338 3.370 -999.990 -999.990 0.843 ..P WKT 2010 08 07 07 39 55 31.3200 -97.3300 251.000 30.0 112.779 3.910 -999.990 -999.990 1.128 ..P WKT 2010 08 07 07 44 55 31.3200 -97.3300 251.000 122.0 114.344 5.110 -999.990 -999.990 1.143 ..P WKT 2010 08 07 07 49 55 31.3200 -97.3300 251.000 457.0 83.793 4.790 -999.990 -999.990 0.838 ..P WKT 2010 08 07 07 59 55 31.3200 -97.3300 251.000 30.0 103.516 4.760 -999.990 -999.990 1.035 ..P WKT 2010 08 07 08 04 55 31.3200 -97.3300 251.000 122.0 106.253 3.800 -999.990 -999.990 1.063 ..P WKT 2010 08 07 08 09 55 31.3200 -97.3300 251.000 457.0 85.640 3.730 -999.990 -999.990 0.856 ..P WKT 2010 08 07 08 14 55 31.3200 -97.3300 251.000 30.0 102.529 3.740 -999.990 -999.990 1.025 ..P WKT 2010 08 07 08 19 55 31.3200 -97.3300 251.000 122.0 111.637 3.610 -999.990 -999.990 1.116 ..P WKT 2010 08 07 08 24 55 31.3200 -97.3300 251.000 457.0 86.349 4.770 -999.990 -999.990 0.863 ..P WKT 2010 08 07 08 34 55 31.3200 -97.3300 251.000 30.0 110.794 3.790 -999.990 -999.990 1.108 ..P WKT 2010 08 07 08 39 55 31.3200 -97.3300 251.000 122.0 110.419 4.270 -999.990 -999.990 1.104 ..P WKT 2010 08 07 08 44 55 31.3200 -97.3300 251.000 457.0 85.973 4.770 -999.990 -999.990 0.860 ..P WKT 2010 08 07 08 49 55 31.3200 -97.3300 251.000 30.0 106.411 5.970 -999.990 -999.990 1.064 ..P WKT 2010 08 07 08 54 55 31.3200 -97.3300 251.000 122.0 110.000 4.030 -999.990 -999.990 1.100 ..P WKT 2010 08 07 08 59 55 31.3200 -97.3300 251.000 457.0 83.000 3.700 -999.990 -999.990 0.830 ..P WKT 2010 08 07 09 09 55 31.3200 -97.3300 251.000 30.0 108.670 4.550 -999.990 -999.990 1.087 ..P WKT 2010 08 07 09 14 55 31.3200 -97.3300 251.000 122.0 104.268 3.570 -999.990 -999.990 1.043 ..P WKT 2010 08 07 09 19 55 31.3200 -97.3300 251.000 457.0 77.766 3.940 -999.990 -999.990 0.778 ..P WKT 2010 08 07 09 24 55 31.3200 -97.3300 251.000 30.0 106.511 4.970 -999.990 -999.990 1.065 ..P WKT 2010 08 07 09 29 55 31.3200 -97.3300 251.000 122.0 105.791 4.440 -999.990 -999.990 1.058 ..P WKT 2010 08 07 09 34 55 31.3200 -97.3300 251.000 457.0 80.984 4.570 -999.990 -999.990 0.810 ..P WKT 2010 08 07 09 44 55 31.3200 -97.3300 251.000 30.0 99.662 4.300 -999.990 -999.990 0.997 ..P WKT 2010 08 07 09 49 55 31.3200 -97.3300 251.000 122.0 103.476 4.180 -999.990 -999.990 1.035 ..P WKT 2010 08 07 09 54 55 31.3200 -97.3300 251.000 457.0 78.946 4.270 -999.990 -999.990 0.789 ..P WKT 2010 08 07 09 59 55 31.3200 -97.3300 251.000 30.0 91.547 3.580 -999.990 -999.990 0.915 ..P WKT 2010 08 07 10 04 55 31.3200 -97.3300 251.000 122.0 97.345 4.010 -999.990 -999.990 0.973 ..P WKT 2010 08 07 10 09 55 31.3200 -97.3300 251.000 457.0 79.330 3.130 -999.990 -999.990 0.793 ..P WKT 2010 08 07 10 19 55 31.3200 -97.3300 251.000 30.0 98.301 3.210 -999.990 -999.990 0.983 ..P WKT 2010 08 07 10 24 55 31.3200 -97.3300 251.000 122.0 98.713 3.770 -999.990 -999.990 0.987 ..P WKT 2010 08 07 10 29 55 31.3200 -97.3300 251.000 457.0 75.873 3.980 -999.990 -999.990 0.759 ..P WKT 2010 08 07 10 34 55 31.3200 -97.3300 251.000 30.0 95.286 3.970 -999.990 -999.990 0.953 ..P WKT 2010 08 07 10 39 55 31.3200 -97.3300 251.000 122.0 97.968 3.620 -999.990 -999.990 0.980 ..P WKT 2010 08 07 10 44 55 31.3200 -97.3300 251.000 457.0 86.184 3.240 -999.990 -999.990 0.862 ..P WKT 2010 08 07 10 54 55 31.3200 -97.3300 251.000 30.0 94.021 4.230 -999.990 -999.990 0.940 ..P WKT 2010 08 07 10 59 55 31.3200 -97.3300 251.000 122.0 98.891 3.960 -999.990 -999.990 0.989 ..P WKT 2010 08 07 11 04 55 31.3200 -97.3300 251.000 457.0 83.335 4.950 -999.990 -999.990 0.833 ..P WKT 2010 08 07 11 09 55 31.3200 -97.3300 251.000 30.0 96.860 3.610 -999.990 -999.990 0.969 ..P WKT 2010 08 07 11 14 55 31.3200 -97.3300 251.000 122.0 89.531 4.080 -999.990 -999.990 0.895 ..P WKT 2010 08 07 11 19 55 31.3200 -97.3300 251.000 457.0 76.809 3.880 -999.990 -999.990 0.768 ..P WKT 2010 08 07 11 29 55 31.3200 -97.3300 251.000 30.0 91.231 3.520 -999.990 -999.990 0.912 ..P WKT 2010 08 07 11 34 55 31.3200 -97.3300 251.000 122.0 95.957 3.970 -999.990 -999.990 0.960 ..P WKT 2010 08 07 11 39 55 31.3200 -97.3300 251.000 457.0 74.853 3.620 -999.990 -999.990 0.749 ..P WKT 2010 08 07 11 44 55 31.3200 -97.3300 251.000 30.0 91.501 4.510 -999.990 -999.990 0.915 ..P WKT 2010 08 07 11 49 55 31.3200 -97.3300 251.000 122.0 92.112 3.230 -999.990 -999.990 0.921 ..P WKT 2010 08 07 12 09 55 31.3200 -97.3300 251.000 457.0 82.189 3.560 -999.990 -999.990 0.822 ..P WKT 2010 08 07 12 10 25 31.3200 -97.3300 251.000 457.0 79.949 5.520 -999.990 -999.990 0.799 ..P WKT 2010 08 07 12 10 55 31.3200 -97.3300 251.000 457.0 78.136 4.790 -999.990 -999.990 0.781 ..P WKT 2010 08 07 12 11 25 31.3200 -97.3300 251.000 457.0 83.135 3.260 -999.990 -999.990 0.831 ..P WKT 2010 08 07 12 11 55 31.3200 -97.3300 251.000 457.0 81.180 3.210 -999.990 -999.990 0.812 ..P WKT 2010 08 07 12 12 25 31.3200 -97.3300 251.000 457.0 85.896 3.900 -999.990 -999.990 0.859 ..P WKT 2010 08 07 12 12 55 31.3200 -97.3300 251.000 457.0 80.392 5.090 -999.990 -999.990 0.804 ..P WKT 2010 08 07 12 13 25 31.3200 -97.3300 251.000 457.0 85.391 4.980 -999.990 -999.990 0.854 ..P WKT 2010 08 07 12 13 55 31.3200 -97.3300 251.000 457.0 83.720 3.890 -999.990 -999.990 0.837 ..P WKT 2010 08 07 12 14 25 31.3200 -97.3300 251.000 457.0 79.635 3.240 -999.990 -999.990 0.796 ..P WKT 2010 08 07 12 14 55 31.3200 -97.3300 251.000 457.0 75.692 3.290 -999.990 -999.990 0.757 ..P WKT 2010 08 07 12 19 55 31.3200 -97.3300 251.000 30.0 92.757 3.430 -999.990 -999.990 0.928 ..P WKT 2010 08 07 12 24 55 31.3200 -97.3300 251.000 122.0 96.337 3.450 -999.990 -999.990 0.963 ..P WKT 2010 08 07 12 29 55 31.3200 -97.3300 251.000 457.0 82.462 3.420 -999.990 -999.990 0.825 ..P WKT 2010 08 07 12 34 55 31.3200 -97.3300 251.000 30.0 101.367 4.260 -999.990 -999.990 1.014 ..P WKT 2010 08 07 12 39 55 31.3200 -97.3300 251.000 122.0 103.242 4.570 -999.990 -999.990 1.032 ..P WKT 2010 08 07 12 44 55 31.3200 -97.3300 251.000 457.0 88.236 4.380 -999.990 -999.990 0.882 ..P WKT 2010 08 07 12 54 55 31.3200 -97.3300 251.000 30.0 94.632 3.770 -999.990 -999.990 0.946 ..P WKT 2010 08 07 12 59 55 31.3200 -97.3300 251.000 122.0 91.492 4.060 -999.990 -999.990 0.915 ..P WKT 2010 08 07 13 04 55 31.3200 -97.3300 251.000 457.0 82.820 6.300 -999.990 -999.990 0.828 ..P WKT 2010 08 07 13 09 55 31.3200 -97.3300 251.000 30.0 97.124 3.950 -999.990 -999.990 0.971 ..P WKT 2010 08 07 13 14 55 31.3200 -97.3300 251.000 122.0 99.231 3.480 -999.990 -999.990 0.992 ..P WKT 2010 08 07 13 19 55 31.3200 -97.3300 251.000 457.0 82.622 3.040 -999.990 -999.990 0.826 ..P WKT 2010 08 07 13 29 55 31.3200 -97.3300 251.000 30.0 94.330 3.370 -999.990 -999.990 0.943 ..P WKT 2010 08 07 13 34 55 31.3200 -97.3300 251.000 122.0 102.228 3.060 -999.990 -999.990 1.022 ..P WKT 2010 08 07 13 39 55 31.3200 -97.3300 251.000 457.0 81.776 4.250 -999.990 -999.990 0.818 ..P WKT 2010 08 07 13 44 55 31.3200 -97.3300 251.000 30.0 99.311 3.630 -999.990 -999.990 0.993 ..P WKT 2010 08 07 13 49 55 31.3200 -97.3300 251.000 122.0 106.641 3.740 -999.990 -999.990 1.066 ..P WKT 2010 08 07 13 54 55 31.3200 -97.3300 251.000 457.0 81.091 4.110 -999.990 -999.990 0.811 ..P WKT 2010 08 07 14 04 55 31.3200 -97.3300 251.000 30.0 94.534 4.070 -999.990 -999.990 0.945 ..P WKT 2010 08 07 14 09 55 31.3200 -97.3300 251.000 122.0 100.930 3.790 -999.990 -999.990 1.009 ..P WKT 2010 08 07 14 14 55 31.3200 -97.3300 251.000 457.0 86.642 3.620 -999.990 -999.990 0.866 ..P WKT 2010 08 07 14 19 55 31.3200 -97.3300 251.000 30.0 98.704 3.770 -999.990 -999.990 0.987 ..P WKT 2010 08 07 14 24 55 31.3200 -97.3300 251.000 122.0 102.549 3.550 -999.990 -999.990 1.025 ..P WKT 2010 08 07 14 29 55 31.3200 -97.3300 251.000 457.0 80.332 3.300 -999.990 -999.990 0.803 ..P WKT 2010 08 07 14 39 55 31.3200 -97.3300 251.000 30.0 102.346 3.100 -999.990 -999.990 1.023 ..P WKT 2010 08 07 14 44 55 31.3200 -97.3300 251.000 122.0 113.431 3.520 -999.990 -999.990 1.134 ..P WKT 2010 08 07 14 49 55 31.3200 -97.3300 251.000 457.0 76.090 2.980 -999.990 -999.990 0.761 ..P WKT 2010 08 07 14 54 55 31.3200 -97.3300 251.000 30.0 97.370 3.550 -999.990 -999.990 0.974 ..P WKT 2010 08 07 14 59 55 31.3200 -97.3300 251.000 122.0 102.789 2.740 -999.990 -999.990 1.028 ..P WKT 2010 08 07 15 04 55 31.3200 -97.3300 251.000 457.0 72.254 3.080 -999.990 -999.990 0.723 ..P WKT 2010 08 07 15 14 55 31.3200 -97.3300 251.000 30.0 96.905 4.330 -999.990 -999.990 0.969 ..P WKT 2010 08 07 15 19 55 31.3200 -97.3300 251.000 122.0 107.357 3.170 -999.990 -999.990 1.074 ..P WKT 2010 08 07 15 24 55 31.3200 -97.3300 251.000 457.0 87.525 4.620 -999.990 -999.990 0.875 ..P WKT 2010 08 07 15 29 55 31.3200 -97.3300 251.000 30.0 105.051 4.520 -999.990 -999.990 1.051 ..P WKT 2010 08 07 15 34 55 31.3200 -97.3300 251.000 122.0 109.275 3.300 -999.990 -999.990 1.093 ..P WKT 2010 08 07 15 39 55 31.3200 -97.3300 251.000 457.0 94.116 3.580 -999.990 -999.990 0.941 ..P WKT 2010 08 07 15 49 55 31.3200 -97.3300 251.000 30.0 102.018 3.410 -999.990 -999.990 1.020 ..P WKT 2010 08 07 15 54 55 31.3200 -97.3300 251.000 122.0 115.879 3.360 -999.990 -999.990 1.159 ..P WKT 2010 08 07 15 59 55 31.3200 -97.3300 251.000 457.0 84.905 3.490 -999.990 -999.990 0.849 ..P WKT 2010 08 07 16 04 55 31.3200 -97.3300 251.000 30.0 100.462 3.180 -999.990 -999.990 1.005 ..P WKT 2010 08 07 16 09 55 31.3200 -97.3300 251.000 122.0 112.058 3.000 -999.990 -999.990 1.121 ..P WKT 2010 08 07 16 14 55 31.3200 -97.3300 251.000 457.0 84.767 3.960 -999.990 -999.990 0.848 ..P WKT 2010 08 07 16 24 55 31.3200 -97.3300 251.000 30.0 99.351 3.250 -999.990 -999.990 0.994 ..P WKT 2010 08 07 16 29 55 31.3200 -97.3300 251.000 122.0 109.549 3.310 -999.990 -999.990 1.095 ..P WKT 2010 08 07 16 34 55 31.3200 -97.3300 251.000 457.0 106.176 3.750 -999.990 -999.990 1.062 ..P WKT 2010 08 07 16 39 55 31.3200 -97.3300 251.000 30.0 110.436 4.620 -999.990 -999.990 1.104 ..P WKT 2010 08 07 16 44 55 31.3200 -97.3300 251.000 122.0 106.074 3.030 -999.990 -999.990 1.061 ..P WKT 2010 08 07 16 49 55 31.3200 -97.3300 251.000 457.0 92.103 3.260 -999.990 -999.990 0.921 ..P WKT 2010 08 07 17 04 55 31.3200 -97.3300 251.000 30.0 94.456 3.480 -999.990 -999.990 0.945 ..P WKT 2010 08 07 17 09 55 31.3200 -97.3300 251.000 122.0 108.336 2.910 -999.990 -999.990 1.083 ..P WKT 2010 08 07 17 14 55 31.3200 -97.3300 251.000 457.0 98.200 3.270 -999.990 -999.990 0.982 ..P WKT 2010 08 07 17 19 55 31.3200 -97.3300 251.000 30.0 96.540 3.210 -999.990 -999.990 0.965 ..P WKT 2010 08 07 17 24 55 31.3200 -97.3300 251.000 122.0 110.700 3.300 -999.990 -999.990 1.107 ..P WKT 2010 08 07 17 29 55 31.3200 -97.3300 251.000 457.0 102.261 2.740 -999.990 -999.990 1.023 ..P WKT 2010 08 07 17 39 55 31.3200 -97.3300 251.000 30.0 94.670 3.560 -999.990 -999.990 0.947 ..P WKT 2010 08 07 17 44 55 31.3200 -97.3300 251.000 122.0 116.697 3.090 -999.990 -999.990 1.167 ..P WKT 2010 08 07 17 49 55 31.3200 -97.3300 251.000 457.0 92.977 3.420 -999.990 -999.990 0.930 ..P WKT 2010 08 07 17 54 55 31.3200 -97.3300 251.000 30.0 92.130 3.590 -999.990 -999.990 0.921 ..P WKT 2010 08 07 17 59 55 31.3200 -97.3300 251.000 122.0 101.165 3.940 -999.990 -999.990 1.012 ..P WKT 2010 08 07 18 04 55 31.3200 -97.3300 251.000 457.0 94.672 3.320 -999.990 -999.990 0.947 ..P WKT 2010 08 07 18 14 55 31.3200 -97.3300 251.000 30.0 92.495 4.130 -999.990 -999.990 0.925 ..P WKT 2010 08 07 18 19 55 31.3200 -97.3300 251.000 122.0 102.455 3.410 -999.990 -999.990 1.025 ..P WKT 2010 08 07 18 24 55 31.3200 -97.3300 251.000 457.0 101.688 3.120 -999.990 -999.990 1.017 ..P WKT 2010 08 07 18 29 55 31.3200 -97.3300 251.000 30.0 99.793 3.510 -999.990 -999.990 0.998 ..P WKT 2010 08 07 18 34 55 31.3200 -97.3300 251.000 122.0 106.646 2.930 -999.990 -999.990 1.066 ..P WKT 2010 08 07 18 39 55 31.3200 -97.3300 251.000 457.0 101.083 2.860 -999.990 -999.990 1.011 ..P WKT 2010 08 07 18 49 55 31.3200 -97.3300 251.000 30.0 95.239 3.050 -999.990 -999.990 0.952 ..P WKT 2010 08 07 18 54 55 31.3200 -97.3300 251.000 122.0 97.496 3.300 -999.990 -999.990 0.975 ..P WKT 2010 08 07 18 59 55 31.3200 -97.3300 251.000 457.0 93.265 4.050 -999.990 -999.990 0.933 ..P WKT 2010 08 07 19 04 55 31.3200 -97.3300 251.000 30.0 89.035 3.910 -999.990 -999.990 0.890 ..P WKT 2010 08 07 19 09 55 31.3200 -97.3300 251.000 122.0 106.803 3.280 -999.990 -999.990 1.068 ..P WKT 2010 08 07 19 14 55 31.3200 -97.3300 251.000 457.0 91.857 3.270 -999.990 -999.990 0.919 ..P WKT 2010 08 07 19 24 55 31.3200 -97.3300 251.000 30.0 88.998 3.030 -999.990 -999.990 0.890 ..P WKT 2010 08 07 19 29 55 31.3200 -97.3300 251.000 122.0 106.015 4.110 -999.990 -999.990 1.060 ..P WKT 2010 08 07 19 34 55 31.3200 -97.3300 251.000 457.0 95.121 3.570 -999.990 -999.990 0.951 ..P WKT 2010 08 07 19 39 55 31.3200 -97.3300 251.000 30.0 83.947 2.920 -999.990 -999.990 0.839 ..P WKT 2010 08 07 19 44 55 31.3200 -97.3300 251.000 122.0 97.296 3.060 -999.990 -999.990 0.973 ..P WKT 2010 08 07 19 49 55 31.3200 -97.3300 251.000 457.0 86.264 2.850 -999.990 -999.990 0.863 ..P WKT 2010 08 07 19 59 55 31.3200 -97.3300 251.000 30.0 83.066 2.890 -999.990 -999.990 0.831 ..P WKT 2010 08 07 20 04 55 31.3200 -97.3300 251.000 122.0 93.291 3.260 -999.990 -999.990 0.933 ..P WKT 2010 08 07 20 09 55 31.3200 -97.3300 251.000 457.0 95.767 2.550 -999.990 -999.990 0.958 ..P WKT 2010 08 07 20 14 55 31.3200 -97.3300 251.000 30.0 88.805 2.800 -999.990 -999.990 0.888 ..P WKT 2010 08 07 20 19 55 31.3200 -97.3300 251.000 122.0 102.830 5.880 -999.990 -999.990 1.028 ..P WKT 2010 08 07 20 24 55 31.3200 -97.3300 251.000 457.0 89.953 2.950 -999.990 -999.990 0.900 ..P WKT 2010 08 07 20 34 55 31.3200 -97.3300 251.000 30.0 89.411 2.760 -999.990 -999.990 0.894 ..P WKT 2010 08 07 20 39 55 31.3200 -97.3300 251.000 122.0 104.981 2.700 -999.990 -999.990 1.050 ..P WKT 2010 08 07 20 44 55 31.3200 -97.3300 251.000 457.0 90.841 4.030 -999.990 -999.990 0.908 ..P WKT 2010 08 07 20 49 55 31.3200 -97.3300 251.000 30.0 87.684 4.630 -999.990 -999.990 0.877 ..P WKT 2010 08 07 20 54 55 31.3200 -97.3300 251.000 122.0 100.857 4.550 -999.990 -999.990 1.009 ..P WKT 2010 08 07 20 59 55 31.3200 -97.3300 251.000 457.0 84.750 3.300 -999.990 -999.990 0.848 ..P WKT 2010 08 07 21 09 55 31.3200 -97.3300 251.000 30.0 88.331 3.840 -999.990 -999.990 0.883 ..P WKT 2010 08 07 21 14 55 31.3200 -97.3300 251.000 122.0 102.525 4.160 -999.990 -999.990 1.025 ..P WKT 2010 08 07 21 19 55 31.3200 -97.3300 251.000 457.0 90.825 4.910 -999.990 -999.990 0.908 ..P WKT 2010 08 07 21 24 55 31.3200 -97.3300 251.000 30.0 89.821 4.140 -999.990 -999.990 0.898 ..P WKT 2010 08 07 21 29 55 31.3200 -97.3300 251.000 122.0 101.760 4.040 -999.990 -999.990 1.018 ..P WKT 2010 08 07 21 34 55 31.3200 -97.3300 251.000 457.0 88.657 2.750 -999.990 -999.990 0.887 ..P WKT 2010 08 07 21 44 55 31.3200 -97.3300 251.000 30.0 95.250 2.710 -999.990 -999.990 0.953 ..P WKT 2010 08 07 21 49 55 31.3200 -97.3300 251.000 122.0 104.251 3.830 -999.990 -999.990 1.043 ..P WKT 2010 08 07 21 54 55 31.3200 -97.3300 251.000 457.0 98.625 4.200 -999.990 -999.990 0.986 ..P WKT 2010 08 07 21 59 55 31.3200 -97.3300 251.000 30.0 93.000 4.110 -999.990 -999.990 0.930 ..P WKT 2010 08 07 22 04 55 31.3200 -97.3300 251.000 122.0 95.813 2.670 -999.990 -999.990 0.958 ..P WKT 2010 08 07 22 09 55 31.3200 -97.3300 251.000 457.0 91.595 3.270 -999.990 -999.990 0.916 ..P WKT 2010 08 07 22 19 55 31.3200 -97.3300 251.000 30.0 91.797 4.110 -999.990 -999.990 0.918 ..P WKT 2010 08 07 22 24 55 31.3200 -97.3300 251.000 122.0 108.867 3.120 -999.990 -999.990 1.089 ..P WKT 2010 08 07 22 29 55 31.3200 -97.3300 251.000 457.0 92.762 4.160 -999.990 -999.990 0.928 ..P WKT 2010 08 07 22 34 55 31.3200 -97.3300 251.000 30.0 92.683 5.320 -999.990 -999.990 0.927 ..P WKT 2010 08 07 22 39 55 31.3200 -97.3300 251.000 122.0 103.002 4.210 -999.990 -999.990 1.030 ..P WKT 2010 08 07 22 44 55 31.3200 -97.3300 251.000 457.0 92.804 3.630 -999.990 -999.990 0.928 ..P WKT 2010 08 07 22 54 55 31.3200 -97.3300 251.000 30.0 88.651 3.400 -999.990 -999.990 0.887 ..P WKT 2010 08 07 22 59 55 31.3200 -97.3300 251.000 122.0 106.213 5.050 -999.990 -999.990 1.062 ..P WKT 2010 08 07 23 04 55 31.3200 -97.3300 251.000 457.0 98.626 5.830 -999.990 -999.990 0.986 ..P WKT 2010 08 07 23 09 55 31.3200 -97.3300 251.000 30.0 98.907 5.000 -999.990 -999.990 0.989 ..P WKT 2010 08 07 23 14 55 31.3200 -97.3300 251.000 122.0 108.599 4.590 -999.990 -999.990 1.086 ..P WKT 2010 08 07 23 19 55 31.3200 -97.3300 251.000 457.0 103.401 3.960 -999.990 -999.990 1.034 ..P WKT 2010 08 07 23 29 55 31.3200 -97.3300 251.000 30.0 98.065 4.290 -999.990 -999.990 0.981 ..P WKT 2010 08 07 23 34 55 31.3200 -97.3300 251.000 122.0 103.821 3.850 -999.990 -999.990 1.038 ..P WKT 2010 08 07 23 39 55 31.3200 -97.3300 251.000 457.0 101.575 5.310 -999.990 -999.990 1.016 ..P WKT 2010 08 07 23 44 55 31.3200 -97.3300 251.000 30.0 98.205 4.980 -999.990 -999.990 0.982 ..P WKT 2010 08 07 23 49 55 31.3200 -97.3300 251.000 122.0 106.487 3.400 -999.990 -999.990 1.065 ..P WKT 2010 08 08 00 09 55 31.3200 -97.3300 251.000 457.0 98.288 2.610 -999.990 -999.990 0.983 ..P WKT 2010 08 08 00 10 25 31.3200 -97.3300 251.000 457.0 97.821 2.690 -999.990 -999.990 0.978 ..P WKT 2010 08 08 00 10 55 31.3200 -97.3300 251.000 457.0 95.249 2.440 -999.990 -999.990 0.952 ..P WKT 2010 08 08 00 11 25 31.3200 -97.3300 251.000 457.0 94.221 2.630 -999.990 -999.990 0.942 ..P WKT 2010 08 08 00 11 55 31.3200 -97.3300 251.000 457.0 96.982 3.030 -999.990 -999.990 0.970 ..P WKT 2010 08 08 00 12 25 31.3200 -97.3300 251.000 457.0 93.708 3.110 -999.990 -999.990 0.937 ..P WKT 2010 08 08 00 12 55 31.3200 -97.3300 251.000 457.0 98.433 2.850 -999.990 -999.990 0.984 ..P WKT 2010 08 08 00 13 25 31.3200 -97.3300 251.000 457.0 95.019 2.570 -999.990 -999.990 0.950 ..P WKT 2010 08 08 00 13 55 31.3200 -97.3300 251.000 457.0 91.324 3.610 -999.990 -999.990 0.913 ..P WKT 2010 08 08 00 14 25 31.3200 -97.3300 251.000 457.0 88.751 2.700 -999.990 -999.990 0.888 ..P WKT 2010 08 08 00 14 55 31.3200 -97.3300 251.000 457.0 92.354 2.740 -999.990 -999.990 0.924 ..P WKT 2010 08 08 00 19 55 31.3200 -97.3300 251.000 30.0 91.895 3.550 -999.990 -999.990 0.919 ..P WKT 2010 08 08 00 24 55 31.3200 -97.3300 251.000 122.0 103.646 3.160 -999.990 -999.990 1.036 ..P WKT 2010 08 08 00 29 55 31.3200 -97.3300 251.000 457.0 91.817 3.720 -999.990 -999.990 0.918 ..P WKT 2010 08 08 00 34 55 31.3200 -97.3300 251.000 30.0 90.656 4.730 -999.990 -999.990 0.907 ..P WKT 2010 08 08 00 39 55 31.3200 -97.3300 251.000 122.0 103.811 2.780 -999.990 -999.990 1.038 ..P WKT 2010 08 08 00 44 55 31.3200 -97.3300 251.000 457.0 93.385 3.090 -999.990 -999.990 0.934 ..P WKT 2010 08 08 00 54 55 31.3200 -97.3300 251.000 30.0 96.608 2.310 -999.990 -999.990 0.966 ..P WKT 2010 08 08 00 59 55 31.3200 -97.3300 251.000 122.0 104.780 3.230 -999.990 -999.990 1.048 ..P WKT 2010 08 08 01 04 55 31.3200 -97.3300 251.000 457.0 106.496 3.930 -999.990 -999.990 1.065 ..P WKT 2010 08 08 01 09 55 31.3200 -97.3300 251.000 30.0 101.476 3.170 -999.990 -999.990 1.015 ..P WKT 2010 08 08 01 14 55 31.3200 -97.3300 251.000 122.0 112.175 3.340 -999.990 -999.990 1.122 ..P WKT 2010 08 08 01 19 55 31.3200 -97.3300 251.000 457.0 113.050 3.250 -999.990 -999.990 1.131 ..P WKT 2010 08 08 01 29 55 31.3200 -97.3300 251.000 30.0 113.876 2.760 -999.990 -999.990 1.139 ..P WKT 2010 08 08 01 34 55 31.3200 -97.3300 251.000 122.0 118.881 3.110 -999.990 -999.990 1.189 ..P WKT 2010 08 08 01 39 55 31.3200 -97.3300 251.000 457.0 115.185 3.310 -999.990 -999.990 1.152 ..P WKT 2010 08 08 01 44 55 31.3200 -97.3300 251.000 30.0 118.505 2.920 -999.990 -999.990 1.185 ..P WKT 2010 08 08 01 49 55 31.3200 -97.3300 251.000 122.0 120.422 3.000 -999.990 -999.990 1.204 ..P WKT 2010 08 08 01 54 55 31.3200 -97.3300 251.000 457.0 94.552 3.130 -999.990 -999.990 0.946 ..P WKT 2010 08 08 02 04 55 31.3200 -97.3300 251.000 30.0 130.543 2.630 -999.990 -999.990 1.305 ..P WKT 2010 08 08 02 09 55 31.3200 -97.3300 251.000 122.0 135.146 4.080 -999.990 -999.990 1.351 ..P WKT 2010 08 08 02 14 55 31.3200 -97.3300 251.000 457.0 129.645 4.190 -999.990 -999.990 1.296 ..P WKT 2010 08 08 02 19 55 31.3200 -97.3300 251.000 30.0 135.651 4.450 -999.990 -999.990 1.357 ..P WKT 2010 08 08 02 24 55 31.3200 -97.3300 251.000 122.0 155.130 3.120 -999.990 -999.990 1.551 ..P WKT 2010 08 08 02 29 55 31.3200 -97.3300 251.000 457.0 154.961 4.230 -999.990 -999.990 1.550 ..P WKT 2010 08 08 02 39 55 31.3200 -97.3300 251.000 30.0 145.864 2.910 -999.990 -999.990 1.459 ..P WKT 2010 08 08 02 44 55 31.3200 -97.3300 251.000 122.0 150.407 4.590 -999.990 -999.990 1.504 ..P WKT 2010 08 08 02 49 55 31.3200 -97.3300 251.000 457.0 98.819 3.230 -999.990 -999.990 0.988 ..P WKT 2010 08 08 02 54 55 31.3200 -97.3300 251.000 30.0 149.248 3.270 -999.990 -999.990 1.492 ..P WKT 2010 08 08 02 59 55 31.3200 -97.3300 251.000 122.0 114.781 3.460 -999.990 -999.990 1.148 ..P WKT 2010 08 08 03 04 55 31.3200 -97.3300 251.000 457.0 84.523 2.430 -999.990 -999.990 0.845 ..P WKT 2010 08 08 03 14 55 31.3200 -97.3300 251.000 30.0 158.858 2.970 -999.990 -999.990 1.589 ..P WKT 2010 08 08 03 19 55 31.3200 -97.3300 251.000 122.0 136.600 4.100 -999.990 -999.990 1.366 ..P WKT 2010 08 08 03 24 55 31.3200 -97.3300 251.000 457.0 97.924 2.990 -999.990 -999.990 0.979 ..P WKT 2010 08 08 03 29 55 31.3200 -97.3300 251.000 30.0 169.399 3.110 -999.990 -999.990 1.694 ..P WKT 2010 08 08 03 34 55 31.3200 -97.3300 251.000 122.0 133.951 3.000 -999.990 -999.990 1.340 ..P WKT 2010 08 08 03 39 55 31.3200 -97.3300 251.000 457.0 92.048 4.170 -999.990 -999.990 0.920 ..P WKT 2010 08 08 03 49 55 31.3200 -97.3300 251.000 30.0 168.805 3.640 -999.990 -999.990 1.688 ..P WKT 2010 08 08 03 54 55 31.3200 -97.3300 251.000 122.0 131.433 3.790 -999.990 -999.990 1.314 ..P WKT 2010 08 08 03 59 55 31.3200 -97.3300 251.000 457.0 91.537 2.870 -999.990 -999.990 0.915 ..P WKT 2010 08 08 04 04 55 31.3200 -97.3300 251.000 30.0 166.415 3.400 -999.990 -999.990 1.664 ..P WKT 2010 08 08 04 09 55 31.3200 -97.3300 251.000 122.0 125.817 3.250 -999.990 -999.990 1.258 ..P WKT 2010 08 08 04 14 55 31.3200 -97.3300 251.000 457.0 91.955 2.950 -999.990 -999.990 0.920 ..P WKT 2010 08 08 04 24 55 31.3200 -97.3300 251.000 30.0 156.281 3.550 -999.990 -999.990 1.563 ..P WKT 2010 08 08 04 29 55 31.3200 -97.3300 251.000 122.0 149.658 2.980 -999.990 -999.990 1.497 ..P WKT 2010 08 08 04 34 55 31.3200 -97.3300 251.000 457.0 90.422 3.090 -999.990 -999.990 0.904 ..P WKT 2010 08 08 04 39 55 31.3200 -97.3300 251.000 30.0 144.832 3.460 -999.990 -999.990 1.448 ..P WKT 2010 08 08 04 44 55 31.3200 -97.3300 251.000 122.0 129.231 3.740 -999.990 -999.990 1.292 ..P WKT 2010 08 08 04 49 55 31.3200 -97.3300 251.000 457.0 91.462 3.700 -999.990 -999.990 0.915 ..P WKT 2010 08 08 05 04 55 31.3200 -97.3300 251.000 30.0 129.369 3.410 -999.990 -999.990 1.294 ..P WKT 2010 08 08 05 09 55 31.3200 -97.3300 251.000 122.0 148.478 3.590 -999.990 -999.990 1.485 ..P WKT 2010 08 08 05 14 55 31.3200 -97.3300 251.000 457.0 92.105 2.830 -999.990 -999.990 0.921 ..P WKT 2010 08 08 05 19 55 31.3200 -97.3300 251.000 30.0 148.532 3.010 -999.990 -999.990 1.485 ..P WKT 2010 08 08 05 24 55 31.3200 -97.3300 251.000 122.0 166.517 4.290 -999.990 -999.990 1.665 ..P WKT 2010 08 08 05 29 55 31.3200 -97.3300 251.000 457.0 88.821 2.970 -999.990 -999.990 0.888 ..P WKT 2010 08 08 05 39 55 31.3200 -97.3300 251.000 30.0 172.575 3.800 -999.990 -999.990 1.726 ..P WKT 2010 08 08 05 44 55 31.3200 -97.3300 251.000 122.0 172.968 3.800 -999.990 -999.990 1.730 ..P WKT 2010 08 08 05 49 55 31.3200 -97.3300 251.000 457.0 91.432 2.940 -999.990 -999.990 0.914 ..P WKT 2010 08 08 05 54 55 31.3200 -97.3300 251.000 30.0 171.508 3.350 -999.990 -999.990 1.715 ..P WKT 2010 08 08 05 59 55 31.3200 -97.3300 251.000 122.0 166.850 4.090 -999.990 -999.990 1.668 ..P WKT 2010 08 08 06 04 55 31.3200 -97.3300 251.000 457.0 88.963 3.000 -999.990 -999.990 0.890 ..P WKT 2010 08 08 06 14 55 31.3200 -97.3300 251.000 30.0 165.203 3.690 -999.990 -999.990 1.652 ..P WKT 2010 08 08 06 19 55 31.3200 -97.3300 251.000 122.0 146.778 2.840 -999.990 -999.990 1.468 ..P WKT 2010 08 08 06 24 55 31.3200 -97.3300 251.000 457.0 105.627 2.760 -999.990 -999.990 1.056 ..P WKT 2010 08 08 06 29 55 31.3200 -97.3300 251.000 30.0 149.488 3.050 -999.990 -999.990 1.495 ..P WKT 2010 08 08 06 34 55 31.3200 -97.3300 251.000 122.0 125.732 3.610 -999.990 -999.990 1.257 ..P WKT 2010 08 08 06 39 55 31.3200 -97.3300 251.000 457.0 109.833 3.640 -999.990 -999.990 1.098 ..P WKT 2010 08 08 06 49 55 31.3200 -97.3300 251.000 30.0 105.088 2.490 -999.990 -999.990 1.051 ..P WKT 2010 08 08 06 54 55 31.3200 -97.3300 251.000 122.0 100.812 2.730 -999.990 -999.990 1.008 ..P WKT 2010 08 08 06 59 55 31.3200 -97.3300 251.000 457.0 84.613 4.190 -999.990 -999.990 0.846 ..P WKT 2010 08 08 07 04 55 31.3200 -97.3300 251.000 30.0 85.668 3.430 -999.990 -999.990 0.857 ..P WKT 2010 08 08 07 09 55 31.3200 -97.3300 251.000 122.0 93.455 3.920 -999.990 -999.990 0.935 ..P WKT 2010 08 08 07 14 55 31.3200 -97.3300 251.000 457.0 84.270 4.170 -999.990 -999.990 0.843 ..P WKT 2010 08 08 07 24 55 31.3200 -97.3300 251.000 30.0 87.100 5.100 -999.990 -999.990 0.871 ..P WKT 2010 08 08 07 29 55 31.3200 -97.3300 251.000 122.0 90.840 4.040 -999.990 -999.990 0.908 ..P WKT 2010 08 08 07 34 55 31.3200 -97.3300 251.000 457.0 92.897 4.160 -999.990 -999.990 0.929 ..P WKT 2010 08 08 07 39 55 31.3200 -97.3300 251.000 30.0 86.958 4.150 -999.990 -999.990 0.870 ..P WKT 2010 08 08 07 44 55 31.3200 -97.3300 251.000 122.0 94.485 3.910 -999.990 -999.990 0.945 ..P WKT 2010 08 08 07 49 55 31.3200 -97.3300 251.000 457.0 79.289 3.690 -999.990 -999.990 0.793 ..P WKT 2010 08 08 07 59 55 31.3200 -97.3300 251.000 30.0 85.265 3.180 -999.990 -999.990 0.853 ..P WKT 2010 08 08 08 04 55 31.3200 -97.3300 251.000 122.0 90.588 3.000 -999.990 -999.990 0.906 ..P WKT 2010 08 08 08 09 55 31.3200 -97.3300 251.000 457.0 85.110 3.700 -999.990 -999.990 0.851 ..P WKT 2010 08 08 08 14 55 31.3200 -97.3300 251.000 30.0 88.469 4.660 -999.990 -999.990 0.885 ..P WKT 2010 08 08 08 19 55 31.3200 -97.3300 251.000 122.0 88.742 3.210 -999.990 -999.990 0.887 ..P WKT 2010 08 08 08 24 55 31.3200 -97.3300 251.000 457.0 87.893 3.960 -999.990 -999.990 0.879 ..P WKT 2010 08 08 08 34 55 31.3200 -97.3300 251.000 30.0 89.641 4.200 -999.990 -999.990 0.896 ..P WKT 2010 08 08 08 39 55 31.3200 -97.3300 251.000 122.0 87.330 3.180 -999.990 -999.990 0.873 ..P WKT 2010 08 08 08 44 55 31.3200 -97.3300 251.000 457.0 75.901 2.930 -999.990 -999.990 0.759 ..P WKT 2010 08 08 08 49 55 31.3200 -97.3300 251.000 30.0 82.005 3.570 -999.990 -999.990 0.820 ..P WKT 2010 08 08 08 54 55 31.3200 -97.3300 251.000 122.0 87.547 4.030 -999.990 -999.990 0.875 ..P WKT 2010 08 08 08 59 55 31.3200 -97.3300 251.000 457.0 74.857 3.000 -999.990 -999.990 0.749 ..P WKT 2010 08 08 09 09 55 31.3200 -97.3300 251.000 30.0 78.789 3.400 -999.990 -999.990 0.788 ..P WKT 2010 08 08 09 14 55 31.3200 -97.3300 251.000 122.0 82.789 4.030 -999.990 -999.990 0.828 ..P WKT 2010 08 08 09 19 55 31.3200 -97.3300 251.000 457.0 74.447 3.880 -999.990 -999.990 0.744 ..P WKT 2010 08 08 09 24 55 31.3200 -97.3300 251.000 30.0 79.849 3.880 -999.990 -999.990 0.798 ..P WKT 2010 08 08 09 29 55 31.3200 -97.3300 251.000 122.0 80.202 2.940 -999.990 -999.990 0.802 ..P WKT 2010 08 08 09 34 55 31.3200 -97.3300 251.000 457.0 61.763 2.990 -999.990 -999.990 0.618 ..P WKT 2010 08 08 09 44 55 31.3200 -97.3300 251.000 30.0 80.100 3.710 -999.990 -999.990 0.801 ..P WKT 2010 08 08 09 49 55 31.3200 -97.3300 251.000 122.0 82.376 2.810 -999.990 -999.990 0.824 ..P WKT 2010 08 08 09 54 55 31.3200 -97.3300 251.000 457.0 69.226 2.730 -999.990 -999.990 0.692 ..P WKT 2010 08 08 09 59 55 31.3200 -97.3300 251.000 30.0 77.112 2.990 -999.990 -999.990 0.771 ..P WKT 2010 08 08 10 04 55 31.3200 -97.3300 251.000 122.0 86.121 2.630 -999.990 -999.990 0.861 ..P WKT 2010 08 08 10 09 55 31.3200 -97.3300 251.000 457.0 67.642 4.530 -999.990 -999.990 0.676 ..P WKT 2010 08 08 10 19 55 31.3200 -97.3300 251.000 30.0 83.133 3.270 -999.990 -999.990 0.831 ..P WKT 2010 08 08 10 24 55 31.3200 -97.3300 251.000 122.0 85.128 3.670 -999.990 -999.990 0.851 ..P WKT 2010 08 08 10 29 55 31.3200 -97.3300 251.000 457.0 67.493 3.590 -999.990 -999.990 0.675 ..P WKT 2010 08 08 10 34 55 31.3200 -97.3300 251.000 30.0 77.060 3.800 -999.990 -999.990 0.771 ..P WKT 2010 08 08 10 39 55 31.3200 -97.3300 251.000 122.0 83.263 3.510 -999.990 -999.990 0.833 ..P WKT 2010 08 08 10 44 55 31.3200 -97.3300 251.000 457.0 67.871 3.920 -999.990 -999.990 0.679 ..P WKT 2010 08 08 10 54 55 31.3200 -97.3300 251.000 30.0 76.971 3.950 -999.990 -999.990 0.770 ..P WKT 2010 08 08 10 59 55 31.3200 -97.3300 251.000 122.0 86.739 4.140 -999.990 -999.990 0.867 ..P WKT 2010 08 08 11 04 55 31.3200 -97.3300 251.000 457.0 67.061 4.250 -999.990 -999.990 0.671 ..P WKT 2010 08 08 11 09 55 31.3200 -97.3300 251.000 30.0 79.072 3.350 -999.990 -999.990 0.791 ..P WKT 2010 08 08 11 14 55 31.3200 -97.3300 251.000 122.0 81.128 4.120 -999.990 -999.990 0.811 ..P WKT 2010 08 08 11 19 55 31.3200 -97.3300 251.000 457.0 68.742 4.290 -999.990 -999.990 0.687 ..P WKT 2010 08 08 11 29 55 31.3200 -97.3300 251.000 30.0 78.572 2.890 -999.990 -999.990 0.786 ..P WKT 2010 08 08 11 34 55 31.3200 -97.3300 251.000 122.0 86.066 2.860 -999.990 -999.990 0.861 ..P WKT 2010 08 08 11 39 55 31.3200 -97.3300 251.000 457.0 73.089 3.990 -999.990 -999.990 0.731 ..P WKT 2010 08 08 11 44 55 31.3200 -97.3300 251.000 30.0 82.125 4.310 -999.990 -999.990 0.821 ..P WKT 2010 08 08 11 49 55 31.3200 -97.3300 251.000 122.0 83.450 5.720 -999.990 -999.990 0.835 ..P WKT 2010 08 08 12 09 55 31.3200 -97.3300 251.000 457.0 65.783 2.870 -999.990 -999.990 0.658 ..P WKT 2010 08 08 12 10 25 31.3200 -97.3300 251.000 457.0 65.162 3.210 -999.990 -999.990 0.652 ..P WKT 2010 08 08 12 10 55 31.3200 -97.3300 251.000 457.0 64.260 3.200 -999.990 -999.990 0.643 ..P WKT 2010 08 08 12 11 25 31.3200 -97.3300 251.000 457.0 64.200 3.290 -999.990 -999.990 0.642 ..P WKT 2010 08 08 12 11 55 31.3200 -97.3300 251.000 457.0 61.055 3.260 -999.990 -999.990 0.611 ..P WKT 2010 08 08 12 12 25 31.3200 -97.3300 251.000 457.0 62.257 3.400 -999.990 -999.990 0.623 ..P WKT 2010 08 08 12 12 55 31.3200 -97.3300 251.000 457.0 63.458 4.100 -999.990 -999.990 0.635 ..P WKT 2010 08 08 12 13 25 31.3200 -97.3300 251.000 457.0 68.445 3.100 -999.990 -999.990 0.684 ..P WKT 2010 08 08 12 13 55 31.3200 -97.3300 251.000 457.0 66.142 3.830 -999.990 -999.990 0.661 ..P WKT 2010 08 08 12 14 25 31.3200 -97.3300 251.000 457.0 65.661 3.460 -999.990 -999.990 0.657 ..P WKT 2010 08 08 12 14 55 31.3200 -97.3300 251.000 457.0 64.760 3.610 -999.990 -999.990 0.648 ..P WKT 2010 08 08 12 19 55 31.3200 -97.3300 251.000 30.0 77.335 3.590 -999.990 -999.990 0.773 ..P WKT 2010 08 08 12 24 55 31.3200 -97.3300 251.000 122.0 91.732 4.810 -999.990 -999.990 0.917 ..P WKT 2010 08 08 12 29 55 31.3200 -97.3300 251.000 457.0 69.540 4.690 -999.990 -999.990 0.695 ..P WKT 2010 08 08 12 34 55 31.3200 -97.3300 251.000 30.0 85.619 4.120 -999.990 -999.990 0.856 ..P WKT 2010 08 08 12 39 55 31.3200 -97.3300 251.000 122.0 87.819 3.450 -999.990 -999.990 0.878 ..P WKT 2010 08 08 12 44 55 31.3200 -97.3300 251.000 457.0 76.983 3.300 -999.990 -999.990 0.770 ..P WKT 2010 08 08 12 54 55 31.3200 -97.3300 251.000 30.0 87.862 4.100 -999.990 -999.990 0.879 ..P WKT 2010 08 08 12 59 55 31.3200 -97.3300 251.000 122.0 90.093 3.530 -999.990 -999.990 0.901 ..P WKT 2010 08 08 13 04 55 31.3200 -97.3300 251.000 457.0 69.618 4.170 -999.990 -999.990 0.696 ..P WKT 2010 08 08 13 09 55 31.3200 -97.3300 251.000 30.0 85.865 4.690 -999.990 -999.990 0.859 ..P WKT 2010 08 08 13 14 55 31.3200 -97.3300 251.000 122.0 89.778 3.810 -999.990 -999.990 0.898 ..P WKT 2010 08 08 13 19 55 31.3200 -97.3300 251.000 457.0 72.108 3.840 -999.990 -999.990 0.721 ..P WKT 2010 08 08 13 29 55 31.3200 -97.3300 251.000 30.0 85.258 4.020 -999.990 -999.990 0.853 ..P WKT 2010 08 08 13 34 55 31.3200 -97.3300 251.000 122.0 88.330 3.510 -999.990 -999.990 0.883 ..P WKT 2010 08 08 13 39 55 31.3200 -97.3300 251.000 457.0 72.343 4.060 -999.990 -999.990 0.723 ..P WKT 2010 08 08 13 44 55 31.3200 -97.3300 251.000 30.0 84.383 3.450 -999.990 -999.990 0.844 ..P WKT 2010 08 08 13 49 55 31.3200 -97.3300 251.000 122.0 83.531 3.430 -999.990 -999.990 0.835 ..P WKT 2010 08 08 13 54 55 31.3200 -97.3300 251.000 457.0 70.069 3.300 -999.990 -999.990 0.701 ..P WKT 2010 08 08 14 04 55 31.3200 -97.3300 251.000 30.0 82.216 3.130 -999.990 -999.990 0.822 ..P WKT 2010 08 08 14 09 55 31.3200 -97.3300 251.000 122.0 91.851 4.050 -999.990 -999.990 0.919 ..P WKT 2010 08 08 14 14 55 31.3200 -97.3300 251.000 457.0 68.423 3.570 -999.990 -999.990 0.684 ..P WKT 2010 08 08 14 19 55 31.3200 -97.3300 251.000 30.0 83.382 3.700 -999.990 -999.990 0.834 ..P WKT 2010 08 08 14 24 55 31.3200 -97.3300 251.000 122.0 84.051 3.610 -999.990 -999.990 0.841 ..P WKT 2010 08 08 14 29 55 31.3200 -97.3300 251.000 457.0 73.794 3.560 -999.990 -999.990 0.738 ..P WKT 2010 08 08 14 39 55 31.3200 -97.3300 251.000 30.0 84.738 3.200 -999.990 -999.990 0.847 ..P WKT 2010 08 08 14 44 55 31.3200 -97.3300 251.000 122.0 91.789 5.150 -999.990 -999.990 0.918 ..P WKT 2010 08 08 14 49 55 31.3200 -97.3300 251.000 457.0 81.613 4.790 -999.990 -999.990 0.816 ..P WKT 2010 08 08 14 54 55 31.3200 -97.3300 251.000 30.0 80.681 5.690 -999.990 -999.990 0.807 ..P WKT 2010 08 08 14 59 55 31.3200 -97.3300 251.000 122.0 88.433 3.670 -999.990 -999.990 0.884 ..P WKT 2010 08 08 15 04 55 31.3200 -97.3300 251.000 457.0 76.157 3.730 -999.990 -999.990 0.762 ..P WKT 2010 08 08 15 14 55 31.3200 -97.3300 251.000 30.0 83.557 5.750 -999.990 -999.990 0.836 ..P WKT 2010 08 08 15 19 55 31.3200 -97.3300 251.000 122.0 89.647 4.550 -999.990 -999.990 0.896 ..P WKT 2010 08 08 15 24 55 31.3200 -97.3300 251.000 457.0 80.333 4.900 -999.990 -999.990 0.803 ..P WKT 2010 08 08 15 29 55 31.3200 -97.3300 251.000 30.0 88.524 4.210 -999.990 -999.990 0.885 ..P WKT 2010 08 08 15 34 55 31.3200 -97.3300 251.000 122.0 92.793 3.360 -999.990 -999.990 0.928 ..P WKT 2010 08 08 15 39 55 31.3200 -97.3300 251.000 457.0 83.340 4.480 -999.990 -999.990 0.833 ..P WKT 2010 08 08 15 49 55 31.3200 -97.3300 251.000 30.0 78.757 3.980 -999.990 -999.990 0.788 ..P WKT 2010 08 08 15 54 55 31.3200 -97.3300 251.000 122.0 94.967 4.040 -999.990 -999.990 0.950 ..P WKT 2010 08 08 15 59 55 31.3200 -97.3300 251.000 457.0 82.895 3.940 -999.990 -999.990 0.829 ..P WKT 2010 08 08 16 04 55 31.3200 -97.3300 251.000 30.0 82.023 3.540 -999.990 -999.990 0.820 ..P WKT 2010 08 08 16 09 55 31.3200 -97.3300 251.000 122.0 89.692 3.440 -999.990 -999.990 0.897 ..P WKT 2010 08 08 16 14 55 31.3200 -97.3300 251.000 457.0 85.600 4.420 -999.990 -999.990 0.856 ..P WKT 2010 08 08 16 24 55 31.3200 -97.3300 251.000 30.0 90.276 3.840 -999.990 -999.990 0.903 ..P WKT 2010 08 08 16 29 55 31.3200 -97.3300 251.000 122.0 96.664 3.700 -999.990 -999.990 0.967 ..P WKT 2010 08 08 16 34 55 31.3200 -97.3300 251.000 457.0 87.234 3.920 -999.990 -999.990 0.872 ..P WKT 2010 08 08 16 39 55 31.3200 -97.3300 251.000 30.0 91.801 3.730 -999.990 -999.990 0.918 ..P WKT 2010 08 08 16 44 55 31.3200 -97.3300 251.000 122.0 96.369 4.070 -999.990 -999.990 0.964 ..P WKT 2010 08 08 16 49 55 31.3200 -97.3300 251.000 457.0 86.380 3.900 -999.990 -999.990 0.864 ..P WKT 2010 08 08 17 04 55 31.3200 -97.3300 251.000 30.0 85.045 5.340 -999.990 -999.990 0.850 ..P WKT 2010 08 08 17 09 55 31.3200 -97.3300 251.000 122.0 89.932 3.580 -999.990 -999.990 0.899 ..P WKT 2010 08 08 17 14 55 31.3200 -97.3300 251.000 457.0 83.623 3.500 -999.990 -999.990 0.836 ..P WKT 2010 08 08 17 19 55 31.3200 -97.3300 251.000 30.0 84.032 3.620 -999.990 -999.990 0.840 ..P WKT 2010 08 08 17 24 55 31.3200 -97.3300 251.000 122.0 92.277 4.680 -999.990 -999.990 0.923 ..P WKT 2010 08 08 17 29 55 31.3200 -97.3300 251.000 457.0 81.490 4.070 -999.990 -999.990 0.815 ..P WKT 2010 08 08 17 39 55 31.3200 -97.3300 251.000 30.0 85.885 4.170 -999.990 -999.990 0.859 ..P WKT 2010 08 08 17 44 55 31.3200 -97.3300 251.000 122.0 89.592 4.050 -999.990 -999.990 0.896 ..P WKT 2010 08 08 17 49 55 31.3200 -97.3300 251.000 457.0 78.466 3.780 -999.990 -999.990 0.785 ..P WKT 2010 08 08 17 54 55 31.3200 -97.3300 251.000 30.0 84.411 3.780 -999.990 -999.990 0.844 ..P WKT 2010 08 08 17 59 55 31.3200 -97.3300 251.000 122.0 86.439 4.410 -999.990 -999.990 0.864 ..P WKT 2010 08 08 18 04 55 31.3200 -97.3300 251.000 457.0 80.911 3.920 -999.990 -999.990 0.809 ..P WKT 2010 08 08 18 14 55 31.3200 -97.3300 251.000 30.0 81.088 3.930 -999.990 -999.990 0.811 ..P WKT 2010 08 08 18 19 55 31.3200 -97.3300 251.000 122.0 90.989 3.990 -999.990 -999.990 0.910 ..P WKT 2010 08 08 18 24 55 31.3200 -97.3300 251.000 457.0 81.865 3.950 -999.990 -999.990 0.819 ..P WKT 2010 08 08 18 29 55 31.3200 -97.3300 251.000 30.0 82.533 4.460 -999.990 -999.990 0.825 ..P WKT 2010 08 08 18 34 55 31.3200 -97.3300 251.000 122.0 89.356 4.130 -999.990 -999.990 0.894 ..P WKT 2010 08 08 18 39 55 31.3200 -97.3300 251.000 457.0 83.589 3.900 -999.990 -999.990 0.836 ..P WKT 2010 08 08 18 49 55 31.3200 -97.3300 251.000 30.0 79.911 4.150 -999.990 -999.990 0.799 ..P WKT 2010 08 08 18 54 55 31.3200 -97.3300 251.000 122.0 90.248 4.580 -999.990 -999.990 0.902 ..P WKT 2010 08 08 18 59 55 31.3200 -97.3300 251.000 457.0 77.231 4.990 -999.990 -999.990 0.772 ..P WKT 2010 08 08 19 04 55 31.3200 -97.3300 251.000 30.0 79.877 4.900 -999.990 -999.990 0.799 ..P WKT 2010 08 08 19 09 55 31.3200 -97.3300 251.000 122.0 91.472 5.110 -999.990 -999.990 0.915 ..P WKT 2010 08 08 19 14 55 31.3200 -97.3300 251.000 457.0 83.630 3.940 -999.990 -999.990 0.836 ..P WKT 2010 08 08 19 24 55 31.3200 -97.3300 251.000 30.0 75.177 4.870 -999.990 -999.990 0.752 ..P WKT 2010 08 08 19 29 55 31.3200 -97.3300 251.000 122.0 88.829 5.040 -999.990 -999.990 0.888 ..P WKT 2010 08 08 19 34 55 31.3200 -97.3300 251.000 457.0 77.172 5.210 -999.990 -999.990 0.772 ..P WKT 2010 08 08 19 39 55 31.3200 -97.3300 251.000 30.0 73.346 5.020 -999.990 -999.990 0.733 ..P WKT 2010 08 08 19 44 55 31.3200 -97.3300 251.000 122.0 84.900 4.270 -999.990 -999.990 0.849 ..P WKT 2010 08 08 19 49 55 31.3200 -97.3300 251.000 457.0 79.815 5.080 -999.990 -999.990 0.798 ..P WKT 2010 08 08 19 59 55 31.3200 -97.3300 251.000 30.0 72.543 4.570 -999.990 -999.990 0.725 ..P WKT 2010 08 08 20 04 55 31.3200 -97.3300 251.000 122.0 85.733 4.460 -999.990 -999.990 0.857 ..P WKT 2010 08 08 20 09 55 31.3200 -97.3300 251.000 457.0 77.953 4.340 -999.990 -999.990 0.780 ..P WKT 2010 08 08 20 14 55 31.3200 -97.3300 251.000 30.0 78.561 4.660 -999.990 -999.990 0.786 ..P WKT 2010 08 08 20 19 55 31.3200 -97.3300 251.000 122.0 81.125 4.160 -999.990 -999.990 0.811 ..P WKT 2010 08 08 20 24 55 31.3200 -97.3300 251.000 457.0 74.605 5.010 -999.990 -999.990 0.746 ..P WKT 2010 08 08 20 34 55 31.3200 -97.3300 251.000 30.0 76.419 3.790 -999.990 -999.990 0.764 ..P WKT 2010 08 08 20 39 55 31.3200 -97.3300 251.000 122.0 89.506 3.910 -999.990 -999.990 0.895 ..P WKT 2010 08 08 20 44 55 31.3200 -97.3300 251.000 457.0 78.833 5.120 -999.990 -999.990 0.788 ..P WKT 2010 08 08 20 49 55 31.3200 -97.3300 251.000 30.0 72.633 4.240 -999.990 -999.990 0.726 ..P WKT 2010 08 08 20 54 55 31.3200 -97.3300 251.000 122.0 88.513 4.300 -999.990 -999.990 0.885 ..P WKT 2010 08 08 20 59 55 31.3200 -97.3300 251.000 457.0 75.325 4.050 -999.990 -999.990 0.753 ..P WKT 2010 08 08 21 09 55 31.3200 -97.3300 251.000 30.0 77.220 3.870 -999.990 -999.990 0.772 ..P WKT 2010 08 08 21 14 55 31.3200 -97.3300 251.000 122.0 84.475 4.000 -999.990 -999.990 0.845 ..P WKT 2010 08 08 21 19 55 31.3200 -97.3300 251.000 457.0 80.551 4.370 -999.990 -999.990 0.806 ..P WKT 2010 08 08 21 24 55 31.3200 -97.3300 251.000 30.0 75.230 4.990 -999.990 -999.990 0.752 ..P WKT 2010 08 08 21 29 55 31.3200 -97.3300 251.000 122.0 84.161 4.970 -999.990 -999.990 0.842 ..P WKT 2010 08 08 21 34 55 31.3200 -97.3300 251.000 457.0 80.797 4.870 -999.990 -999.990 0.808 ..P WKT 2010 08 08 21 44 55 31.3200 -97.3300 251.000 30.0 82.411 4.450 -999.990 -999.990 0.824 ..P WKT 2010 08 08 21 49 55 31.3200 -97.3300 251.000 122.0 92.418 4.820 -999.990 -999.990 0.924 ..P WKT 2010 08 08 21 54 55 31.3200 -97.3300 251.000 457.0 81.190 5.310 -999.990 -999.990 0.812 ..P WKT 2010 08 08 21 59 55 31.3200 -97.3300 251.000 30.0 85.050 5.280 -999.990 -999.990 0.851 ..P WKT 2010 08 08 22 04 55 31.3200 -97.3300 251.000 122.0 91.705 5.170 -999.990 -999.990 0.917 ..P WKT 2010 08 08 22 09 55 31.3200 -97.3300 251.000 457.0 92.212 5.420 -999.990 -999.990 0.922 ..P WKT 2010 08 08 22 19 55 31.3200 -97.3300 251.000 30.0 81.873 5.790 -999.990 -999.990 0.819 ..P WKT 2010 08 08 22 24 55 31.3200 -97.3300 251.000 122.0 84.714 5.390 -999.990 -999.990 0.847 ..P WKT 2010 08 08 22 29 55 31.3200 -97.3300 251.000 457.0 84.763 5.650 -999.990 -999.990 0.848 ..P WKT 2010 08 08 22 34 55 31.3200 -97.3300 251.000 30.0 76.850 5.530 -999.990 -999.990 0.768 ..P WKT 2010 08 08 22 39 55 31.3200 -97.3300 251.000 122.0 88.910 5.690 -999.990 -999.990 0.889 ..P WKT 2010 08 08 22 44 55 31.3200 -97.3300 251.000 457.0 83.930 6.420 -999.990 -999.990 0.839 ..P WKT 2010 08 08 22 54 55 31.3200 -97.3300 251.000 30.0 78.501 5.330 -999.990 -999.990 0.785 ..P WKT 2010 08 08 22 59 55 31.3200 -97.3300 251.000 122.0 94.251 5.080 -999.990 -999.990 0.943 ..P WKT 2010 08 08 23 04 55 31.3200 -97.3300 251.000 457.0 84.863 5.370 -999.990 -999.990 0.849 ..P WKT 2010 08 08 23 09 55 31.3200 -97.3300 251.000 30.0 78.269 5.530 -999.990 -999.990 0.783 ..P WKT 2010 08 08 23 14 55 31.3200 -97.3300 251.000 122.0 95.273 5.390 -999.990 -999.990 0.953 ..P WKT 2010 08 08 23 19 55 31.3200 -97.3300 251.000 457.0 86.445 4.830 -999.990 -999.990 0.864 ..P WKT 2010 08 08 23 29 55 31.3200 -97.3300 251.000 30.0 86.769 4.510 -999.990 -999.990 0.868 ..P WKT 2010 08 08 23 34 55 31.3200 -97.3300 251.000 122.0 92.010 5.170 -999.990 -999.990 0.920 ..P WKT 2010 08 08 23 39 55 31.3200 -97.3300 251.000 457.0 88.037 5.800 -999.990 -999.990 0.880 ..P WKT 2010 08 08 23 44 55 31.3200 -97.3300 251.000 30.0 76.945 6.090 -999.990 -999.990 0.769 ..P WKT 2010 08 08 23 49 55 31.3200 -97.3300 251.000 122.0 96.286 4.960 -999.990 -999.990 0.963 ..P WKT 2010 08 09 00 09 55 31.3200 -97.3300 251.000 457.0 81.520 4.430 -999.990 -999.990 0.815 ..P WKT 2010 08 09 00 10 25 31.3200 -97.3300 251.000 457.0 84.188 4.720 -999.990 -999.990 0.842 ..P WKT 2010 08 09 00 10 55 31.3200 -97.3300 251.000 457.0 88.112 4.480 -999.990 -999.990 0.881 ..P WKT 2010 08 09 00 11 25 31.3200 -97.3300 251.000 457.0 87.569 5.140 -999.990 -999.990 0.876 ..P WKT 2010 08 09 00 11 55 31.3200 -97.3300 251.000 457.0 80.464 4.310 -999.990 -999.990 0.805 ..P WKT 2010 08 09 00 12 25 31.3200 -97.3300 251.000 457.0 80.479 4.310 -999.990 -999.990 0.805 ..P WKT 2010 08 09 00 12 55 31.3200 -97.3300 251.000 457.0 80.215 4.310 -999.990 -999.990 0.802 ..P WKT 2010 08 09 00 13 25 31.3200 -97.3300 251.000 457.0 84.558 5.250 -999.990 -999.990 0.846 ..P WKT 2010 08 09 00 13 55 31.3200 -97.3300 251.000 457.0 87.227 4.330 -999.990 -999.990 0.872 ..P WKT 2010 08 09 00 14 25 31.3200 -97.3300 251.000 457.0 80.400 5.250 -999.990 -999.990 0.804 ..P WKT 2010 08 09 00 14 55 31.3200 -97.3300 251.000 457.0 86.699 6.010 -999.990 -999.990 0.867 ..P WKT 2010 08 09 00 19 55 31.3200 -97.3300 251.000 30.0 72.748 5.220 -999.990 -999.990 0.727 ..P WKT 2010 08 09 00 24 55 31.3200 -97.3300 251.000 122.0 88.121 4.410 -999.990 -999.990 0.881 ..P WKT 2010 08 09 00 29 55 31.3200 -97.3300 251.000 457.0 87.156 4.380 -999.990 -999.990 0.872 ..P WKT 2010 08 09 00 34 55 31.3200 -97.3300 251.000 30.0 78.649 5.180 -999.990 -999.990 0.786 ..P WKT 2010 08 09 00 39 55 31.3200 -97.3300 251.000 122.0 95.006 5.630 -999.990 -999.990 0.950 ..P WKT 2010 08 09 00 44 55 31.3200 -97.3300 251.000 457.0 89.291 4.580 -999.990 -999.990 0.893 ..P WKT 2010 08 09 00 54 55 31.3200 -97.3300 251.000 30.0 80.849 4.510 -999.990 -999.990 0.808 ..P WKT 2010 08 09 00 59 55 31.3200 -97.3300 251.000 122.0 86.787 4.570 -999.990 -999.990 0.868 ..P WKT 2010 08 09 01 04 55 31.3200 -97.3300 251.000 457.0 79.308 4.650 -999.990 -999.990 0.793 ..P WKT 2010 08 09 01 09 55 31.3200 -97.3300 251.000 30.0 80.214 4.780 -999.990 -999.990 0.802 ..P WKT 2010 08 09 01 14 55 31.3200 -97.3300 251.000 122.0 90.907 4.970 -999.990 -999.990 0.909 ..P WKT 2010 08 09 01 19 55 31.3200 -97.3300 251.000 457.0 81.748 5.040 -999.990 -999.990 0.817 ..P WKT 2010 08 09 01 29 55 31.3200 -97.3300 251.000 30.0 89.516 5.350 -999.990 -999.990 0.895 ..P WKT 2010 08 09 01 34 55 31.3200 -97.3300 251.000 122.0 95.538 5.220 -999.990 -999.990 0.955 ..P WKT 2010 08 09 01 39 55 31.3200 -97.3300 251.000 457.0 84.778 4.820 -999.990 -999.990 0.848 ..P WKT 2010 08 09 01 44 55 31.3200 -97.3300 251.000 30.0 91.361 4.570 -999.990 -999.990 0.914 ..P WKT 2010 08 09 01 49 55 31.3200 -97.3300 251.000 122.0 95.147 4.850 -999.990 -999.990 0.951 ..P WKT 2010 08 09 01 54 55 31.3200 -97.3300 251.000 457.0 91.659 4.090 -999.990 -999.990 0.917 ..P WKT 2010 08 09 02 04 55 31.3200 -97.3300 251.000 30.0 88.399 3.990 -999.990 -999.990 0.884 ..P WKT 2010 08 09 02 09 55 31.3200 -97.3300 251.000 122.0 93.945 4.300 -999.990 -999.990 0.939 ..P WKT 2010 08 09 02 14 55 31.3200 -97.3300 251.000 457.0 102.854 4.030 -999.990 -999.990 1.029 ..P WKT 2010 08 09 02 19 55 31.3200 -97.3300 251.000 30.0 87.685 4.160 -999.990 -999.990 0.877 ..P WKT 2010 08 09 02 24 55 31.3200 -97.3300 251.000 122.0 91.554 4.210 -999.990 -999.990 0.916 ..P WKT 2010 08 09 02 29 55 31.3200 -97.3300 251.000 457.0 91.503 4.230 -999.990 -999.990 0.915 ..P WKT 2010 08 09 02 39 55 31.3200 -97.3300 251.000 30.0 89.001 4.690 -999.990 -999.990 0.890 ..P WKT 2010 08 09 02 44 55 31.3200 -97.3300 251.000 122.0 90.891 5.490 -999.990 -999.990 0.909 ..P WKT 2010 08 09 02 49 55 31.3200 -97.3300 251.000 457.0 83.676 4.090 -999.990 -999.990 0.837 ..P WKT 2010 08 09 02 54 55 31.3200 -97.3300 251.000 30.0 82.624 4.120 -999.990 -999.990 0.826 ..P WKT 2010 08 09 02 59 55 31.3200 -97.3300 251.000 122.0 87.035 4.070 -999.990 -999.990 0.870 ..P WKT 2010 08 09 03 04 55 31.3200 -97.3300 251.000 457.0 91.307 4.220 -999.990 -999.990 0.913 ..P WKT 2010 08 09 03 14 55 31.3200 -97.3300 251.000 30.0 88.983 3.860 -999.990 -999.990 0.890 ..P WKT 2010 08 09 03 19 55 31.3200 -97.3300 251.000 122.0 89.252 4.700 -999.990 -999.990 0.893 ..P WKT 2010 08 09 03 24 55 31.3200 -97.3300 251.000 457.0 82.373 5.680 -999.990 -999.990 0.824 ..P WKT 2010 08 09 03 29 55 31.3200 -97.3300 251.000 30.0 91.333 3.990 -999.990 -999.990 0.913 ..P WKT 2010 08 09 03 34 55 31.3200 -97.3300 251.000 122.0 86.836 5.670 -999.990 -999.990 0.868 ..P WKT 2010 08 09 03 39 55 31.3200 -97.3300 251.000 457.0 82.477 3.680 -999.990 -999.990 0.825 ..P WKT 2010 08 09 03 49 55 31.3200 -97.3300 251.000 30.0 90.327 4.080 -999.990 -999.990 0.903 ..P WKT 2010 08 09 03 54 55 31.3200 -97.3300 251.000 122.0 88.513 3.980 -999.990 -999.990 0.885 ..P WKT 2010 08 09 03 59 55 31.3200 -97.3300 251.000 457.0 81.509 3.410 -999.990 -999.990 0.815 ..P WKT 2010 08 09 04 04 55 31.3200 -97.3300 251.000 30.0 87.269 3.390 -999.990 -999.990 0.873 ..P WKT 2010 08 09 04 09 55 31.3200 -97.3300 251.000 122.0 86.155 3.600 -999.990 -999.990 0.862 ..P WKT 2010 08 09 04 14 55 31.3200 -97.3300 251.000 457.0 80.130 3.360 -999.990 -999.990 0.801 ..P WKT 2010 08 09 04 24 55 31.3200 -97.3300 251.000 30.0 85.139 3.570 -999.990 -999.990 0.851 ..P WKT 2010 08 09 04 29 55 31.3200 -97.3300 251.000 122.0 92.667 5.000 -999.990 -999.990 0.927 ..P WKT 2010 08 09 04 34 55 31.3200 -97.3300 251.000 457.0 83.491 3.920 -999.990 -999.990 0.835 ..P WKT 2010 08 09 04 39 55 31.3200 -97.3300 251.000 30.0 89.196 4.130 -999.990 -999.990 0.892 ..P WKT 2010 08 09 04 44 55 31.3200 -97.3300 251.000 122.0 89.004 5.170 -999.990 -999.990 0.890 ..P WKT 2010 08 09 04 49 55 31.3200 -97.3300 251.000 457.0 82.354 4.710 -999.990 -999.990 0.824 ..P WKT 2010 08 09 05 04 55 31.3200 -97.3300 251.000 30.0 80.743 4.440 -999.990 -999.990 0.807 ..P WKT 2010 08 09 05 09 55 31.3200 -97.3300 251.000 122.0 88.743 4.070 -999.990 -999.990 0.887 ..P WKT 2010 08 09 05 14 55 31.3200 -97.3300 251.000 457.0 86.068 4.030 -999.990 -999.990 0.861 ..P WKT 2010 08 09 05 19 55 31.3200 -97.3300 251.000 30.0 84.235 3.830 -999.990 -999.990 0.842 ..P WKT 2010 08 09 05 24 55 31.3200 -97.3300 251.000 122.0 93.643 3.670 -999.990 -999.990 0.936 ..P WKT 2010 08 09 05 29 55 31.3200 -97.3300 251.000 457.0 86.189 3.550 -999.990 -999.990 0.862 ..P WKT 2010 08 09 05 39 55 31.3200 -97.3300 251.000 30.0 90.408 3.500 -999.990 -999.990 0.904 ..P WKT 2010 08 09 05 44 55 31.3200 -97.3300 251.000 122.0 94.775 3.410 -999.990 -999.990 0.948 ..P WKT 2010 08 09 05 49 55 31.3200 -97.3300 251.000 457.0 79.742 3.650 -999.990 -999.990 0.797 ..P WKT 2010 08 09 05 54 55 31.3200 -97.3300 251.000 30.0 83.828 3.570 -999.990 -999.990 0.838 ..P WKT 2010 08 09 05 59 55 31.3200 -97.3300 251.000 122.0 88.195 3.780 -999.990 -999.990 0.882 ..P WKT 2010 08 09 06 04 55 31.3200 -97.3300 251.000 457.0 76.532 2.900 -999.990 -999.990 0.765 ..P WKT 2010 08 09 06 14 55 31.3200 -97.3300 251.000 30.0 89.850 3.100 -999.990 -999.990 0.898 ..P WKT 2010 08 09 06 19 55 31.3200 -97.3300 251.000 122.0 107.242 3.120 -999.990 -999.990 1.072 ..P WKT 2010 08 09 06 24 55 31.3200 -97.3300 251.000 457.0 74.975 2.940 -999.990 -999.990 0.750 ..P WKT 2010 08 09 06 29 55 31.3200 -97.3300 251.000 30.0 107.284 3.520 -999.990 -999.990 1.073 ..P WKT 2010 08 09 06 34 55 31.3200 -97.3300 251.000 122.0 117.084 4.170 -999.990 -999.990 1.171 ..P WKT 2010 08 09 06 39 55 31.3200 -97.3300 251.000 457.0 78.758 2.890 -999.990 -999.990 0.788 ..P WKT 2010 08 09 06 49 55 31.3200 -97.3300 251.000 30.0 116.778 2.780 -999.990 -999.990 1.168 ..P WKT 2010 08 09 06 54 55 31.3200 -97.3300 251.000 122.0 115.584 3.040 -999.990 -999.990 1.156 ..P WKT 2010 08 09 06 59 55 31.3200 -97.3300 251.000 457.0 72.576 3.120 -999.990 -999.990 0.726 ..P WKT 2010 08 09 07 04 55 31.3200 -97.3300 251.000 30.0 107.421 3.800 -999.990 -999.990 1.074 ..P WKT 2010 08 09 07 09 55 31.3200 -97.3300 251.000 122.0 105.380 3.310 -999.990 -999.990 1.054 ..P WKT 2010 08 09 07 14 55 31.3200 -97.3300 251.000 457.0 72.357 2.850 -999.990 -999.990 0.724 ..P WKT 2010 08 09 07 24 55 31.3200 -97.3300 251.000 30.0 101.126 3.340 -999.990 -999.990 1.011 ..P WKT 2010 08 09 07 29 55 31.3200 -97.3300 251.000 122.0 99.688 3.600 -999.990 -999.990 0.997 ..P WKT 2010 08 09 07 34 55 31.3200 -97.3300 251.000 457.0 70.636 3.560 -999.990 -999.990 0.706 ..P WKT 2010 08 09 07 39 55 31.3200 -97.3300 251.000 30.0 94.555 4.000 -999.990 -999.990 0.946 ..P WKT 2010 08 09 07 44 55 31.3200 -97.3300 251.000 122.0 94.947 3.530 -999.990 -999.990 0.949 ..P WKT 2010 08 09 07 49 55 31.3200 -97.3300 251.000 457.0 77.442 2.910 -999.990 -999.990 0.774 ..P WKT 2010 08 09 07 59 55 31.3200 -97.3300 251.000 30.0 87.244 3.560 -999.990 -999.990 0.872 ..P WKT 2010 08 09 08 04 55 31.3200 -97.3300 251.000 122.0 83.124 4.010 -999.990 -999.990 0.831 ..P WKT 2010 08 09 08 09 55 31.3200 -97.3300 251.000 457.0 75.762 3.830 -999.990 -999.990 0.758 ..P WKT 2010 08 09 08 14 55 31.3200 -97.3300 251.000 30.0 80.100 3.250 -999.990 -999.990 0.801 ..P WKT 2010 08 09 08 19 55 31.3200 -97.3300 251.000 122.0 79.363 3.860 -999.990 -999.990 0.794 ..P WKT 2010 08 09 08 24 55 31.3200 -97.3300 251.000 457.0 74.537 4.410 -999.990 -999.990 0.745 ..P WKT 2010 08 09 08 34 55 31.3200 -97.3300 251.000 30.0 79.872 2.790 -999.990 -999.990 0.799 ..P WKT 2010 08 09 08 39 55 31.3200 -97.3300 251.000 122.0 83.407 2.850 -999.990 -999.990 0.834 ..P WKT 2010 08 09 08 44 55 31.3200 -97.3300 251.000 457.0 73.116 3.390 -999.990 -999.990 0.731 ..P WKT 2010 08 09 08 49 55 31.3200 -97.3300 251.000 30.0 77.215 2.270 -999.990 -999.990 0.772 ..P WKT 2010 08 09 08 54 55 31.3200 -97.3300 251.000 122.0 81.033 2.900 -999.990 -999.990 0.810 ..P WKT 2010 08 09 08 59 55 31.3200 -97.3300 251.000 457.0 69.046 2.950 -999.990 -999.990 0.690 ..P WKT 2010 08 09 09 09 55 31.3200 -97.3300 251.000 30.0 80.393 2.820 -999.990 -999.990 0.804 ..P WKT 2010 08 09 09 14 55 31.3200 -97.3300 251.000 122.0 74.089 2.840 -999.990 -999.990 0.741 ..P WKT 2010 08 09 09 19 55 31.3200 -97.3300 251.000 457.0 72.302 2.840 -999.990 -999.990 0.723 ..P WKT 2010 08 09 09 24 55 31.3200 -97.3300 251.000 30.0 76.444 3.060 -999.990 -999.990 0.764 ..P WKT 2010 08 09 09 29 55 31.3200 -97.3300 251.000 122.0 83.977 2.760 -999.990 -999.990 0.840 ..P WKT 2010 08 09 09 34 55 31.3200 -97.3300 251.000 457.0 78.235 4.310 -999.990 -999.990 0.782 ..P WKT 2010 08 09 09 44 55 31.3200 -97.3300 251.000 30.0 79.180 2.630 -999.990 -999.990 0.792 ..P WKT 2010 08 09 09 49 55 31.3200 -97.3300 251.000 122.0 89.823 3.340 -999.990 -999.990 0.898 ..P WKT 2010 08 09 09 54 55 31.3200 -97.3300 251.000 457.0 75.038 4.370 -999.990 -999.990 0.750 ..P WKT 2010 08 09 09 59 55 31.3200 -97.3300 251.000 30.0 80.032 2.510 -999.990 -999.990 0.800 ..P WKT 2010 08 09 10 04 55 31.3200 -97.3300 251.000 122.0 85.875 2.870 -999.990 -999.990 0.859 ..P WKT 2010 08 09 10 09 55 31.3200 -97.3300 251.000 457.0 76.738 2.610 -999.990 -999.990 0.767 ..P WKT 2010 08 09 10 19 55 31.3200 -97.3300 251.000 30.0 87.638 2.650 -999.990 -999.990 0.876 ..P WKT 2010 08 09 10 24 55 31.3200 -97.3300 251.000 122.0 92.837 2.400 -999.990 -999.990 0.928 ..P WKT 2010 08 09 10 29 55 31.3200 -97.3300 251.000 457.0 82.627 4.430 -999.990 -999.990 0.826 ..P WKT 2010 08 09 10 34 55 31.3200 -97.3300 251.000 30.0 92.917 5.230 -999.990 -999.990 0.929 ..P WKT 2010 08 09 10 39 55 31.3200 -97.3300 251.000 122.0 93.876 4.460 -999.990 -999.990 0.939 ..P WKT 2010 08 09 10 44 55 31.3200 -97.3300 251.000 457.0 84.511 2.970 -999.990 -999.990 0.845 ..P WKT 2010 08 09 10 54 55 31.3200 -97.3300 251.000 30.0 90.227 3.130 -999.990 -999.990 0.902 ..P WKT 2010 08 09 10 59 55 31.3200 -97.3300 251.000 122.0 87.488 5.060 -999.990 -999.990 0.875 ..P WKT 2010 08 09 11 04 55 31.3200 -97.3300 251.000 457.0 76.684 5.180 -999.990 -999.990 0.767 ..P WKT 2010 08 09 11 09 55 31.3200 -97.3300 251.000 30.0 76.632 5.660 -999.990 -999.990 0.766 ..P WKT 2010 08 09 11 14 55 31.3200 -97.3300 251.000 122.0 85.494 5.280 -999.990 -999.990 0.855 ..P WKT 2010 08 09 11 19 55 31.3200 -97.3300 251.000 457.0 76.385 3.830 -999.990 -999.990 0.764 ..P WKT 2010 08 09 11 29 55 31.3200 -97.3300 251.000 30.0 76.113 3.860 -999.990 -999.990 0.761 ..P WKT 2010 08 09 11 34 55 31.3200 -97.3300 251.000 122.0 82.830 4.730 -999.990 -999.990 0.828 ..P WKT 2010 08 09 11 39 55 31.3200 -97.3300 251.000 457.0 75.816 5.310 -999.990 -999.990 0.758 ..P WKT 2010 08 09 11 44 55 31.3200 -97.3300 251.000 30.0 78.711 5.480 -999.990 -999.990 0.787 ..P WKT 2010 08 09 11 49 55 31.3200 -97.3300 251.000 122.0 84.297 3.550 -999.990 -999.990 0.843 ..P WKT 2010 08 09 12 09 55 31.3200 -97.3300 251.000 457.0 76.730 2.110 -999.990 -999.990 0.767 ..P WKT 2010 08 09 12 10 25 31.3200 -97.3300 251.000 457.0 80.238 2.720 -999.990 -999.990 0.802 ..P WKT 2010 08 09 12 10 55 31.3200 -97.3300 251.000 457.0 74.828 2.380 -999.990 -999.990 0.748 ..P WKT 2010 08 09 12 11 25 31.3200 -97.3300 251.000 457.0 70.408 2.520 -999.990 -999.990 0.704 ..P WKT 2010 08 09 12 11 55 31.3200 -97.3300 251.000 457.0 65.281 2.590 -999.990 -999.990 0.653 ..P WKT 2010 08 09 12 12 25 31.3200 -97.3300 251.000 457.0 72.612 3.270 -999.990 -999.990 0.726 ..P WKT 2010 08 09 12 12 55 31.3200 -97.3300 251.000 457.0 73.856 2.070 -999.990 -999.990 0.739 ..P WKT 2010 08 09 12 13 25 31.3200 -97.3300 251.000 457.0 75.099 2.160 -999.990 -999.990 0.751 ..P WKT 2010 08 09 12 13 55 31.3200 -97.3300 251.000 457.0 75.918 2.210 -999.990 -999.990 0.759 ..P WKT 2010 08 09 12 14 25 31.3200 -97.3300 251.000 457.0 82.116 3.480 -999.990 -999.990 0.821 ..P WKT 2010 08 09 12 14 55 31.3200 -97.3300 251.000 457.0 76.282 2.220 -999.990 -999.990 0.763 ..P WKT 2010 08 09 12 19 55 31.3200 -97.3300 251.000 30.0 81.070 3.950 -999.990 -999.990 0.811 ..P WKT 2010 08 09 12 24 55 31.3200 -97.3300 251.000 122.0 86.989 5.390 -999.990 -999.990 0.870 ..P WKT 2010 08 09 12 29 55 31.3200 -97.3300 251.000 457.0 75.364 4.500 -999.990 -999.990 0.754 ..P WKT 2010 08 09 12 34 55 31.3200 -97.3300 251.000 30.0 84.959 2.720 -999.990 -999.990 0.850 ..P WKT 2010 08 09 12 39 55 31.3200 -97.3300 251.000 122.0 84.934 2.980 -999.990 -999.990 0.849 ..P WKT 2010 08 09 12 44 55 31.3200 -97.3300 251.000 457.0 79.254 2.670 -999.990 -999.990 0.793 ..P WKT 2010 08 09 12 54 55 31.3200 -97.3300 251.000 30.0 85.747 1.840 -999.990 -999.990 0.857 ..P WKT 2010 08 09 12 59 55 31.3200 -97.3300 251.000 122.0 86.328 1.950 -999.990 -999.990 0.863 ..P WKT 2010 08 09 13 04 55 31.3200 -97.3300 251.000 457.0 77.019 2.450 -999.990 -999.990 0.770 ..P WKT 2010 08 09 13 09 55 31.3200 -97.3300 251.000 30.0 81.839 2.750 -999.990 -999.990 0.818 ..P WKT 2010 08 09 13 14 55 31.3200 -97.3300 251.000 122.0 92.586 2.390 -999.990 -999.990 0.926 ..P WKT 2010 08 09 13 19 55 31.3200 -97.3300 251.000 457.0 80.459 3.730 -999.990 -999.990 0.805 ..P WKT 2010 08 09 13 29 55 31.3200 -97.3300 251.000 30.0 87.709 3.210 -999.990 -999.990 0.877 ..P WKT 2010 08 09 13 34 55 31.3200 -97.3300 251.000 122.0 95.505 3.270 -999.990 -999.990 0.955 ..P WKT 2010 08 09 13 39 55 31.3200 -97.3300 251.000 457.0 73.673 3.160 -999.990 -999.990 0.737 ..P WKT 2010 08 09 13 44 55 31.3200 -97.3300 251.000 30.0 87.110 3.570 -999.990 -999.990 0.871 ..P WKT 2010 08 09 13 49 55 31.3200 -97.3300 251.000 122.0 93.772 3.240 -999.990 -999.990 0.938 ..P WKT 2010 08 09 13 54 55 31.3200 -97.3300 251.000 457.0 74.774 5.240 -999.990 -999.990 0.748 ..P WKT 2010 08 09 14 04 55 31.3200 -97.3300 251.000 30.0 85.238 2.190 -999.990 -999.990 0.852 ..P WKT 2010 08 09 14 09 55 31.3200 -97.3300 251.000 122.0 101.717 2.820 -999.990 -999.990 1.017 ..P WKT 2010 08 09 14 14 55 31.3200 -97.3300 251.000 457.0 75.508 2.370 -999.990 -999.990 0.755 ..P WKT 2010 08 09 14 19 55 31.3200 -97.3300 251.000 30.0 90.153 3.860 -999.990 -999.990 0.902 ..P WKT 2010 08 09 14 24 55 31.3200 -97.3300 251.000 122.0 100.145 4.550 -999.990 -999.990 1.001 ..P WKT 2010 08 09 14 29 55 31.3200 -97.3300 251.000 457.0 83.244 2.500 -999.990 -999.990 0.832 ..P WKT 2010 08 09 14 39 55 31.3200 -97.3300 251.000 30.0 96.020 3.300 -999.990 -999.990 0.960 ..P WKT 2010 08 09 14 44 55 31.3200 -97.3300 251.000 122.0 103.731 2.720 -999.990 -999.990 1.037 ..P WKT 2010 08 09 14 49 55 31.3200 -97.3300 251.000 457.0 93.856 2.750 -999.990 -999.990 0.939 ..P WKT 2010 08 09 14 54 55 31.3200 -97.3300 251.000 30.0 90.314 3.360 -999.990 -999.990 0.903 ..P WKT 2010 08 09 14 59 55 31.3200 -97.3300 251.000 122.0 98.022 2.790 -999.990 -999.990 0.980 ..P WKT 2010 08 09 15 04 55 31.3200 -97.3300 251.000 457.0 89.981 3.180 -999.990 -999.990 0.900 ..P WKT 2010 08 09 15 14 55 31.3200 -97.3300 251.000 30.0 81.780 3.800 -999.990 -999.990 0.818 ..P WKT 2010 08 09 15 19 55 31.3200 -97.3300 251.000 122.0 94.962 3.660 -999.990 -999.990 0.950 ..P WKT 2010 08 09 15 24 55 31.3200 -97.3300 251.000 457.0 91.564 3.710 -999.990 -999.990 0.916 ..P WKT 2010 08 09 15 29 55 31.3200 -97.3300 251.000 30.0 87.325 3.920 -999.990 -999.990 0.873 ..P WKT 2010 08 09 15 34 55 31.3200 -97.3300 251.000 122.0 91.934 4.090 -999.990 -999.990 0.919 ..P WKT 2010 08 09 15 39 55 31.3200 -97.3300 251.000 457.0 82.082 4.570 -999.990 -999.990 0.821 ..P WKT 2010 08 09 15 49 55 31.3200 -97.3300 251.000 30.0 84.358 4.550 -999.990 -999.990 0.844 ..P WKT 2010 08 09 15 54 55 31.3200 -97.3300 251.000 122.0 91.569 3.930 -999.990 -999.990 0.916 ..P WKT 2010 08 09 15 59 55 31.3200 -97.3300 251.000 457.0 90.361 3.630 -999.990 -999.990 0.904 ..P WKT 2010 08 09 16 04 55 31.3200 -97.3300 251.000 30.0 87.891 3.140 -999.990 -999.990 0.879 ..P WKT 2010 08 09 16 09 55 31.3200 -97.3300 251.000 122.0 96.218 2.750 -999.990 -999.990 0.962 ..P WKT 2010 08 09 16 14 55 31.3200 -97.3300 251.000 457.0 82.534 3.030 -999.990 -999.990 0.825 ..P WKT 2010 08 09 16 24 55 31.3200 -97.3300 251.000 30.0 81.345 2.270 -999.990 -999.990 0.813 ..P WKT 2010 08 09 16 29 55 31.3200 -97.3300 251.000 122.0 91.167 2.710 -999.990 -999.990 0.912 ..P WKT 2010 08 09 16 34 55 31.3200 -97.3300 251.000 457.0 81.658 2.480 -999.990 -999.990 0.817 ..P WKT 2010 08 09 16 39 55 31.3200 -97.3300 251.000 30.0 82.794 2.440 -999.990 -999.990 0.828 ..P WKT 2010 08 09 16 44 55 31.3200 -97.3300 251.000 122.0 94.011 2.610 -999.990 -999.990 0.940 ..P WKT 2010 08 09 16 49 55 31.3200 -97.3300 251.000 457.0 88.425 2.190 -999.990 -999.990 0.884 ..P WKT 2010 08 09 17 04 55 31.3200 -97.3300 251.000 30.0 79.156 3.420 -999.990 -999.990 0.792 ..P WKT 2010 08 09 17 09 55 31.3200 -97.3300 251.000 122.0 85.986 2.450 -999.990 -999.990 0.860 ..P WKT 2010 08 09 17 14 55 31.3200 -97.3300 251.000 457.0 79.669 3.450 -999.990 -999.990 0.797 ..P WKT 2010 08 09 17 19 55 31.3200 -97.3300 251.000 30.0 81.183 3.200 -999.990 -999.990 0.812 ..P WKT 2010 08 09 17 24 55 31.3200 -97.3300 251.000 122.0 84.933 2.710 -999.990 -999.990 0.849 ..P WKT 2010 08 09 17 29 55 31.3200 -97.3300 251.000 457.0 80.576 2.510 -999.990 -999.990 0.806 ..P WKT 2010 08 09 17 39 55 31.3200 -97.3300 251.000 30.0 81.307 2.310 -999.990 -999.990 0.813 ..P WKT 2010 08 09 17 44 55 31.3200 -97.3300 251.000 122.0 97.565 3.010 -999.990 -999.990 0.976 ..P WKT 2010 08 09 17 49 55 31.3200 -97.3300 251.000 457.0 96.500 4.700 -999.990 -999.990 0.965 ..P WKT 2010 08 09 17 54 55 31.3200 -97.3300 251.000 30.0 94.599 6.080 -999.990 -999.990 0.946 ..P WKT 2010 08 09 17 59 55 31.3200 -97.3300 251.000 122.0 101.073 5.270 -999.990 -999.990 1.011 ..P WKT 2010 08 09 18 04 55 31.3200 -97.3300 251.000 457.0 96.101 4.360 -999.990 -999.990 0.961 ..P WKT 2010 08 09 18 14 55 31.3200 -97.3300 251.000 30.0 93.616 4.390 -999.990 -999.990 0.936 ..P WKT 2010 08 09 18 19 55 31.3200 -97.3300 251.000 122.0 103.911 5.600 -999.990 -999.990 1.039 ..P WKT 2010 08 09 18 24 55 31.3200 -97.3300 251.000 457.0 90.496 6.540 -999.990 -999.990 0.905 ..P WKT 2010 08 09 18 29 55 31.3200 -97.3300 251.000 30.0 87.682 8.060 -999.990 -999.990 0.877 ..P WKT 2010 08 09 18 34 55 31.3200 -97.3300 251.000 122.0 91.142 7.320 -999.990 -999.990 0.911 ..P WKT 2010 08 09 18 39 55 31.3200 -97.3300 251.000 457.0 84.287 4.410 -999.990 -999.990 0.843 ..P WKT 2010 08 09 18 49 55 31.3200 -97.3300 251.000 30.0 76.617 4.850 -999.990 -999.990 0.766 ..P WKT 2010 08 09 18 54 55 31.3200 -97.3300 251.000 122.0 97.386 7.260 -999.990 -999.990 0.974 ..P WKT 2010 08 09 18 59 55 31.3200 -97.3300 251.000 457.0 83.753 8.320 -999.990 -999.990 0.838 ..P WKT 2010 08 09 19 04 55 31.3200 -97.3300 251.000 30.0 82.237 6.770 -999.990 -999.990 0.822 ..P WKT 2010 08 09 19 09 55 31.3200 -97.3300 251.000 122.0 95.476 5.660 -999.990 -999.990 0.955 ..P WKT 2010 08 09 19 14 55 31.3200 -97.3300 251.000 457.0 82.408 4.800 -999.990 -999.990 0.824 ..P WKT 2010 08 09 19 24 55 31.3200 -97.3300 251.000 30.0 82.976 3.800 -999.990 -999.990 0.830 ..P WKT 2010 08 09 19 29 55 31.3200 -97.3300 251.000 122.0 85.893 5.700 -999.990 -999.990 0.859 ..P WKT 2010 08 09 19 34 55 31.3200 -97.3300 251.000 457.0 80.187 6.720 -999.990 -999.990 0.802 ..P WKT 2010 08 09 19 39 55 31.3200 -97.3300 251.000 30.0 83.660 5.500 -999.990 -999.990 0.837 ..P WKT 2010 08 09 19 44 55 31.3200 -97.3300 251.000 122.0 86.435 4.000 -999.990 -999.990 0.864 ..P WKT 2010 08 09 19 49 55 31.3200 -97.3300 251.000 457.0 78.370 3.060 -999.990 -999.990 0.784 ..P WKT 2010 08 09 19 59 55 31.3200 -97.3300 251.000 30.0 75.685 3.340 -999.990 -999.990 0.757 ..P WKT 2010 08 09 20 04 55 31.3200 -97.3300 251.000 122.0 84.253 5.200 -999.990 -999.990 0.843 ..P WKT 2010 08 09 20 09 55 31.3200 -97.3300 251.000 457.0 80.043 4.190 -999.990 -999.990 0.800 ..P WKT 2010 08 09 20 14 55 31.3200 -97.3300 251.000 30.0 71.809 4.640 -999.990 -999.990 0.718 ..P WKT 2010 08 09 20 19 55 31.3200 -97.3300 251.000 122.0 83.011 3.870 -999.990 -999.990 0.830 ..P WKT 2010 08 09 20 24 55 31.3200 -97.3300 251.000 457.0 78.665 4.280 -999.990 -999.990 0.787 ..P WKT 2010 08 09 20 34 55 31.3200 -97.3300 251.000 30.0 71.286 3.300 -999.990 -999.990 0.713 ..P WKT 2010 08 09 20 39 55 31.3200 -97.3300 251.000 122.0 83.787 3.490 -999.990 -999.990 0.838 ..P WKT 2010 08 09 20 44 55 31.3200 -97.3300 251.000 457.0 76.314 3.800 -999.990 -999.990 0.763 ..P WKT 2010 08 09 20 49 55 31.3200 -97.3300 251.000 30.0 72.173 3.440 -999.990 -999.990 0.722 ..P WKT 2010 08 09 20 54 55 31.3200 -97.3300 251.000 122.0 81.892 3.460 -999.990 -999.990 0.819 ..P WKT 2010 08 09 20 59 55 31.3200 -97.3300 251.000 457.0 71.377 3.320 -999.990 -999.990 0.714 ..P WKT 2010 08 09 21 09 55 31.3200 -97.3300 251.000 30.0 74.698 3.330 -999.990 -999.990 0.747 ..P WKT 2010 08 09 21 14 55 31.3200 -97.3300 251.000 122.0 84.924 3.210 -999.990 -999.990 0.849 ..P WKT 2010 08 09 21 19 55 31.3200 -97.3300 251.000 457.0 69.392 4.140 -999.990 -999.990 0.694 ..P WKT 2010 08 09 21 24 55 31.3200 -97.3300 251.000 30.0 70.201 3.310 -999.990 -999.990 0.702 ..P WKT 2010 08 09 21 29 55 31.3200 -97.3300 251.000 122.0 79.869 3.660 -999.990 -999.990 0.799 ..P WKT 2010 08 09 21 34 55 31.3200 -97.3300 251.000 457.0 75.140 2.580 -999.990 -999.990 0.751 ..P WKT 2010 08 09 21 44 55 31.3200 -97.3300 251.000 30.0 78.850 2.840 -999.990 -999.990 0.788 ..P WKT 2010 08 09 21 49 55 31.3200 -97.3300 251.000 122.0 89.496 3.340 -999.990 -999.990 0.895 ..P WKT 2010 08 09 21 54 55 31.3200 -97.3300 251.000 457.0 82.439 2.920 -999.990 -999.990 0.824 ..P WKT 2010 08 09 21 59 55 31.3200 -97.3300 251.000 30.0 73.173 3.240 -999.990 -999.990 0.732 ..P WKT 2010 08 09 22 04 55 31.3200 -97.3300 251.000 122.0 88.512 3.080 -999.990 -999.990 0.885 ..P WKT 2010 08 09 22 09 55 31.3200 -97.3300 251.000 457.0 83.118 4.120 -999.990 -999.990 0.831 ..P WKT 2010 08 09 22 19 55 31.3200 -97.3300 251.000 30.0 76.716 2.480 -999.990 -999.990 0.767 ..P WKT 2010 08 09 22 24 55 31.3200 -97.3300 251.000 122.0 95.318 2.660 -999.990 -999.990 0.953 ..P WKT 2010 08 09 22 29 55 31.3200 -97.3300 251.000 457.0 84.226 2.920 -999.990 -999.990 0.842 ..P WKT 2010 08 09 22 34 55 31.3200 -97.3300 251.000 30.0 77.141 2.620 -999.990 -999.990 0.771 ..P WKT 2010 08 09 22 39 55 31.3200 -97.3300 251.000 122.0 90.902 3.290 -999.990 -999.990 0.909 ..P WKT 2010 08 09 22 44 55 31.3200 -97.3300 251.000 457.0 84.509 2.880 -999.990 -999.990 0.845 ..P WKT 2010 08 09 22 54 55 31.3200 -97.3300 251.000 30.0 84.914 2.580 -999.990 -999.990 0.849 ..P WKT 2010 08 09 22 59 55 31.3200 -97.3300 251.000 122.0 93.775 2.800 -999.990 -999.990 0.938 ..P WKT 2010 08 09 23 04 55 31.3200 -97.3300 251.000 457.0 81.398 2.610 -999.990 -999.990 0.814 ..P WKT 2010 08 09 23 09 55 31.3200 -97.3300 251.000 30.0 78.401 3.200 -999.990 -999.990 0.784 ..P WKT 2010 08 09 23 14 55 31.3200 -97.3300 251.000 122.0 84.502 3.820 -999.990 -999.990 0.845 ..P WKT 2010 08 09 23 19 55 31.3200 -97.3300 251.000 457.0 85.088 4.150 -999.990 -999.990 0.851 ..P WKT 2010 08 09 23 29 55 31.3200 -97.3300 251.000 30.0 84.341 3.240 -999.990 -999.990 0.843 ..P WKT 2010 08 09 23 34 55 31.3200 -97.3300 251.000 122.0 90.997 4.240 -999.990 -999.990 0.910 ..P WKT 2010 08 09 23 39 55 31.3200 -97.3300 251.000 457.0 80.851 5.550 -999.990 -999.990 0.809 ..P WKT 2010 08 09 23 44 55 31.3200 -97.3300 251.000 30.0 78.418 4.130 -999.990 -999.990 0.784 ..P WKT 2010 08 09 23 49 55 31.3200 -97.3300 251.000 122.0 94.431 4.490 -999.990 -999.990 0.944 ..P WKT 2010 08 10 00 09 55 31.3200 -97.3300 251.000 457.0 82.871 5.120 -999.990 -999.990 0.829 ..P WKT 2010 08 10 00 10 25 31.3200 -97.3300 251.000 457.0 85.852 5.100 -999.990 -999.990 0.859 ..P WKT 2010 08 10 00 10 55 31.3200 -97.3300 251.000 457.0 81.954 4.910 -999.990 -999.990 0.820 ..P WKT 2010 08 10 00 11 25 31.3200 -97.3300 251.000 457.0 87.962 5.080 -999.990 -999.990 0.880 ..P WKT 2010 08 10 00 11 55 31.3200 -97.3300 251.000 457.0 89.018 5.090 -999.990 -999.990 0.890 ..P WKT 2010 08 10 00 12 25 31.3200 -97.3300 251.000 457.0 89.798 4.870 -999.990 -999.990 0.898 ..P WKT 2010 08 10 00 12 55 31.3200 -97.3300 251.000 457.0 82.873 5.180 -999.990 -999.990 0.829 ..P WKT 2010 08 10 00 13 25 31.3200 -97.3300 251.000 457.0 82.002 5.610 -999.990 -999.990 0.820 ..P WKT 2010 08 10 00 13 55 31.3200 -97.3300 251.000 457.0 83.883 5.070 -999.990 -999.990 0.839 ..P WKT 2010 08 10 00 14 25 31.3200 -97.3300 251.000 457.0 84.938 4.640 -999.990 -999.990 0.849 ..P WKT 2010 08 10 00 14 55 31.3200 -97.3300 251.000 457.0 84.618 4.570 -999.990 -999.990 0.846 ..P WKT 2010 08 10 00 19 55 31.3200 -97.3300 251.000 30.0 73.981 4.280 -999.990 -999.990 0.740 ..P WKT 2010 08 10 00 24 55 31.3200 -97.3300 251.000 122.0 89.489 4.070 -999.990 -999.990 0.895 ..P WKT 2010 08 10 00 29 55 31.3200 -97.3300 251.000 457.0 85.182 3.520 -999.990 -999.990 0.852 ..P WKT 2010 08 10 00 34 55 31.3200 -97.3300 251.000 30.0 81.976 3.730 -999.990 -999.990 0.820 ..P WKT 2010 08 10 00 39 55 31.3200 -97.3300 251.000 122.0 88.952 3.000 -999.990 -999.990 0.890 ..P WKT 2010 08 10 00 44 55 31.3200 -97.3300 251.000 457.0 90.975 3.480 -999.990 -999.990 0.910 ..P WKT 2010 08 10 00 54 55 31.3200 -97.3300 251.000 30.0 82.426 2.380 -999.990 -999.990 0.824 ..P WKT 2010 08 10 00 59 55 31.3200 -97.3300 251.000 122.0 86.166 2.500 -999.990 -999.990 0.862 ..P WKT 2010 08 10 01 04 55 31.3200 -97.3300 251.000 457.0 77.244 3.650 -999.990 -999.990 0.772 ..P WKT 2010 08 10 01 09 55 31.3200 -97.3300 251.000 30.0 78.782 3.450 -999.990 -999.990 0.788 ..P WKT 2010 08 10 01 14 55 31.3200 -97.3300 251.000 122.0 79.632 3.970 -999.990 -999.990 0.796 ..P WKT 2010 08 10 01 19 55 31.3200 -97.3300 251.000 457.0 77.867 3.440 -999.990 -999.990 0.779 ..P WKT 2010 08 10 01 29 55 31.3200 -97.3300 251.000 30.0 83.519 2.650 -999.990 -999.990 0.835 ..P WKT 2010 08 10 01 34 55 31.3200 -97.3300 251.000 122.0 94.378 3.070 -999.990 -999.990 0.944 ..P WKT 2010 08 10 01 39 55 31.3200 -97.3300 251.000 457.0 88.582 4.420 -999.990 -999.990 0.886 ..P WKT 2010 08 10 01 44 55 31.3200 -97.3300 251.000 30.0 92.008 4.130 -999.990 -999.990 0.920 ..P WKT 2010 08 10 01 49 55 31.3200 -97.3300 251.000 122.0 89.790 5.760 -999.990 -999.990 0.898 ..P WKT 2010 08 10 01 54 55 31.3200 -97.3300 251.000 457.0 92.941 2.800 -999.990 -999.990 0.929 ..P WKT 2010 08 10 02 04 55 31.3200 -97.3300 251.000 30.0 100.031 3.960 -999.990 -999.990 1.000 ..P WKT 2010 08 10 02 09 55 31.3200 -97.3300 251.000 122.0 93.369 3.840 -999.990 -999.990 0.934 ..P WKT 2010 08 10 02 14 55 31.3200 -97.3300 251.000 457.0 90.974 4.230 -999.990 -999.990 0.910 ..P WKT 2010 08 10 02 19 55 31.3200 -97.3300 251.000 30.0 88.854 3.840 -999.990 -999.990 0.889 ..P WKT 2010 08 10 02 24 55 31.3200 -97.3300 251.000 122.0 91.691 3.450 -999.990 -999.990 0.917 ..P WKT 2010 08 10 02 29 55 31.3200 -97.3300 251.000 457.0 82.550 3.450 -999.990 -999.990 0.826 ..P WKT 2010 08 10 02 39 55 31.3200 -97.3300 251.000 30.0 87.083 3.500 -999.990 -999.990 0.871 ..P WKT 2010 08 10 02 44 55 31.3200 -97.3300 251.000 122.0 92.497 3.030 -999.990 -999.990 0.925 ..P WKT 2010 08 10 02 49 55 31.3200 -97.3300 251.000 457.0 86.206 3.530 -999.990 -999.990 0.862 ..P WKT 2010 08 10 02 54 55 31.3200 -97.3300 251.000 30.0 87.628 3.270 -999.990 -999.990 0.876 ..P WKT 2010 08 10 02 59 55 31.3200 -97.3300 251.000 122.0 91.940 5.100 -999.990 -999.990 0.919 ..P WKT 2010 08 10 03 04 55 31.3200 -97.3300 251.000 457.0 89.093 3.070 -999.990 -999.990 0.891 ..P WKT 2010 08 10 03 14 55 31.3200 -97.3300 251.000 30.0 102.107 3.560 -999.990 -999.990 1.021 ..P WKT 2010 08 10 03 19 55 31.3200 -97.3300 251.000 122.0 87.945 2.500 -999.990 -999.990 0.879 ..P WKT 2010 08 10 03 24 55 31.3200 -97.3300 251.000 457.0 86.179 5.410 -999.990 -999.990 0.862 ..P WKT 2010 08 10 03 29 55 31.3200 -97.3300 251.000 30.0 100.941 2.800 -999.990 -999.990 1.009 ..P WKT 2010 08 10 03 34 55 31.3200 -97.3300 251.000 122.0 101.104 2.980 -999.990 -999.990 1.011 ..P WKT 2010 08 10 03 39 55 31.3200 -97.3300 251.000 457.0 86.940 3.230 -999.990 -999.990 0.869 ..P WKT 2010 08 10 03 49 55 31.3200 -97.3300 251.000 30.0 97.616 3.320 -999.990 -999.990 0.976 ..P WKT 2010 08 10 03 54 55 31.3200 -97.3300 251.000 122.0 125.486 3.200 -999.990 -999.990 1.255 ..P WKT 2010 08 10 03 59 55 31.3200 -97.3300 251.000 457.0 82.275 3.410 -999.990 -999.990 0.823 ..P WKT 2010 08 10 04 04 55 31.3200 -97.3300 251.000 30.0 98.850 3.820 -999.990 -999.990 0.988 ..P WKT 2010 08 10 04 09 55 31.3200 -97.3300 251.000 122.0 115.977 3.810 -999.990 -999.990 1.160 ..P WKT 2010 08 10 04 14 55 31.3200 -97.3300 251.000 457.0 81.029 3.280 -999.990 -999.990 0.810 ..P WKT 2010 08 10 04 24 55 31.3200 -97.3300 251.000 30.0 114.419 2.780 -999.990 -999.990 1.144 ..P WKT 2010 08 10 04 29 55 31.3200 -97.3300 251.000 122.0 140.052 2.860 -999.990 -999.990 1.401 ..P WKT 2010 08 10 04 34 55 31.3200 -97.3300 251.000 457.0 90.731 3.910 -999.990 -999.990 0.907 ..P WKT 2010 08 10 04 39 55 31.3200 -97.3300 251.000 30.0 137.859 2.820 -999.990 -999.990 1.379 ..P WKT 2010 08 10 04 44 55 31.3200 -97.3300 251.000 122.0 118.023 3.930 -999.990 -999.990 1.180 ..P WKT 2010 08 10 04 49 55 31.3200 -97.3300 251.000 457.0 75.036 2.990 -999.990 -999.990 0.750 ..P WKT 2010 08 10 05 04 55 31.3200 -97.3300 251.000 30.0 135.821 2.770 -999.990 -999.990 1.358 ..P WKT 2010 08 10 05 09 55 31.3200 -97.3300 251.000 122.0 122.804 4.600 -999.990 -999.990 1.228 ..P WKT 2010 08 10 05 14 55 31.3200 -97.3300 251.000 457.0 80.845 3.840 -999.990 -999.990 0.808 ..P WKT 2010 08 10 05 19 55 31.3200 -97.3300 251.000 30.0 137.424 4.050 -999.990 -999.990 1.374 ..P WKT 2010 08 10 05 24 55 31.3200 -97.3300 251.000 122.0 127.024 3.410 -999.990 -999.990 1.270 ..P WKT 2010 08 10 05 29 55 31.3200 -97.3300 251.000 457.0 87.543 3.930 -999.990 -999.990 0.875 ..P WKT 2010 08 10 05 39 55 31.3200 -97.3300 251.000 30.0 123.123 3.840 -999.990 -999.990 1.231 ..P WKT 2010 08 10 05 44 55 31.3200 -97.3300 251.000 122.0 131.890 3.850 -999.990 -999.990 1.319 ..P WKT 2010 08 10 05 49 55 31.3200 -97.3300 251.000 457.0 94.207 3.410 -999.990 -999.990 0.942 ..P WKT 2010 08 10 05 54 55 31.3200 -97.3300 251.000 30.0 131.095 4.150 -999.990 -999.990 1.311 ..P WKT 2010 08 10 05 59 55 31.3200 -97.3300 251.000 122.0 116.292 3.800 -999.990 -999.990 1.163 ..P WKT 2010 08 10 06 04 55 31.3200 -97.3300 251.000 457.0 79.708 2.820 -999.990 -999.990 0.797 ..P WKT 2010 08 10 06 14 55 31.3200 -97.3300 251.000 30.0 116.584 3.640 -999.990 -999.990 1.166 ..P WKT 2010 08 10 06 19 55 31.3200 -97.3300 251.000 122.0 110.228 3.810 -999.990 -999.990 1.102 ..P WKT 2010 08 10 06 24 55 31.3200 -97.3300 251.000 457.0 76.987 4.070 -999.990 -999.990 0.770 ..P WKT 2010 08 10 06 29 55 31.3200 -97.3300 251.000 30.0 109.923 3.650 -999.990 -999.990 1.099 ..P WKT 2010 08 10 06 34 55 31.3200 -97.3300 251.000 122.0 106.324 3.080 -999.990 -999.990 1.063 ..P WKT 2010 08 10 06 39 55 31.3200 -97.3300 251.000 457.0 76.527 2.390 -999.990 -999.990 0.765 ..P WKT 2010 08 10 06 49 55 31.3200 -97.3300 251.000 30.0 100.489 3.190 -999.990 -999.990 1.005 ..P WKT 2010 08 10 06 54 55 31.3200 -97.3300 251.000 122.0 94.683 3.550 -999.990 -999.990 0.947 ..P WKT 2010 08 10 06 59 55 31.3200 -97.3300 251.000 457.0 71.916 3.700 -999.990 -999.990 0.719 ..P WKT 2010 08 10 07 04 55 31.3200 -97.3300 251.000 30.0 98.376 4.000 -999.990 -999.990 0.984 ..P WKT 2010 08 10 07 09 55 31.3200 -97.3300 251.000 122.0 96.982 3.210 -999.990 -999.990 0.970 ..P WKT 2010 08 10 07 14 55 31.3200 -97.3300 251.000 457.0 78.626 3.050 -999.990 -999.990 0.786 ..P WKT 2010 08 10 07 24 55 31.3200 -97.3300 251.000 30.0 96.169 2.960 -999.990 -999.990 0.962 ..P WKT 2010 08 10 07 29 55 31.3200 -97.3300 251.000 122.0 97.868 2.860 -999.990 -999.990 0.979 ..P WKT 2010 08 10 07 34 55 31.3200 -97.3300 251.000 457.0 81.638 3.350 -999.990 -999.990 0.816 ..P WKT 2010 08 10 07 39 55 31.3200 -97.3300 251.000 30.0 91.612 2.990 -999.990 -999.990 0.916 ..P WKT 2010 08 10 07 44 55 31.3200 -97.3300 251.000 122.0 98.277 3.440 -999.990 -999.990 0.983 ..P WKT 2010 08 10 07 49 55 31.3200 -97.3300 251.000 457.0 83.149 3.440 -999.990 -999.990 0.831 ..P WKT 2010 08 10 07 59 55 31.3200 -97.3300 251.000 30.0 94.154 3.870 -999.990 -999.990 0.942 ..P WKT 2010 08 10 08 04 55 31.3200 -97.3300 251.000 122.0 97.390 3.850 -999.990 -999.990 0.974 ..P WKT 2010 08 10 08 09 55 31.3200 -97.3300 251.000 457.0 82.418 3.900 -999.990 -999.990 0.824 ..P WKT 2010 08 10 08 14 55 31.3200 -97.3300 251.000 30.0 93.932 3.750 -999.990 -999.990 0.939 ..P WKT 2010 08 10 08 19 55 31.3200 -97.3300 251.000 122.0 97.444 4.960 -999.990 -999.990 0.974 ..P WKT 2010 08 10 08 24 55 31.3200 -97.3300 251.000 457.0 86.886 3.900 -999.990 -999.990 0.869 ..P WKT 2010 08 10 08 34 55 31.3200 -97.3300 251.000 30.0 88.826 5.730 -999.990 -999.990 0.888 ..P WKT 2010 08 10 08 39 55 31.3200 -97.3300 251.000 122.0 95.532 3.530 -999.990 -999.990 0.955 ..P WKT 2010 08 10 08 44 55 31.3200 -97.3300 251.000 457.0 76.576 3.280 -999.990 -999.990 0.766 ..P WKT 2010 08 10 08 49 55 31.3200 -97.3300 251.000 30.0 85.489 3.280 -999.990 -999.990 0.855 ..P WKT 2010 08 10 08 54 55 31.3200 -97.3300 251.000 122.0 88.608 2.980 -999.990 -999.990 0.886 ..P WKT 2010 08 10 08 59 55 31.3200 -97.3300 251.000 457.0 75.170 2.760 -999.990 -999.990 0.752 ..P WKT 2010 08 10 09 09 55 31.3200 -97.3300 251.000 30.0 85.113 3.080 -999.990 -999.990 0.851 ..P WKT 2010 08 10 09 14 55 31.3200 -97.3300 251.000 122.0 91.939 2.850 -999.990 -999.990 0.919 ..P WKT 2010 08 10 09 19 55 31.3200 -97.3300 251.000 457.0 75.305 2.390 -999.990 -999.990 0.753 ..P WKT 2010 08 10 09 24 55 31.3200 -97.3300 251.000 30.0 89.720 2.510 -999.990 -999.990 0.897 ..P WKT 2010 08 10 09 29 55 31.3200 -97.3300 251.000 122.0 96.822 2.830 -999.990 -999.990 0.968 ..P WKT 2010 08 10 09 34 55 31.3200 -97.3300 251.000 457.0 77.427 2.030 -999.990 -999.990 0.774 ..P WKT 2010 08 10 09 44 55 31.3200 -97.3300 251.000 30.0 85.184 2.510 -999.990 -999.990 0.852 ..P WKT 2010 08 10 09 49 55 31.3200 -97.3300 251.000 122.0 98.675 2.730 -999.990 -999.990 0.987 ..P WKT 2010 08 10 09 54 55 31.3200 -97.3300 251.000 457.0 73.382 3.370 -999.990 -999.990 0.734 ..P WKT 2010 08 10 09 59 55 31.3200 -97.3300 251.000 30.0 76.935 4.090 -999.990 -999.990 0.769 ..P WKT 2010 08 10 10 04 55 31.3200 -97.3300 251.000 122.0 86.839 3.490 -999.990 -999.990 0.868 ..P WKT 2010 08 10 10 09 55 31.3200 -97.3300 251.000 457.0 70.654 4.310 -999.990 -999.990 0.707 ..P WKT 2010 08 10 10 19 55 31.3200 -97.3300 251.000 30.0 83.520 4.100 -999.990 -999.990 0.835 ..P WKT 2010 08 10 10 24 55 31.3200 -97.3300 251.000 122.0 85.792 4.100 -999.990 -999.990 0.858 ..P WKT 2010 08 10 10 29 55 31.3200 -97.3300 251.000 457.0 66.943 5.570 -999.990 -999.990 0.669 ..P WKT 2010 08 10 10 34 55 31.3200 -97.3300 251.000 30.0 83.986 4.250 -999.990 -999.990 0.840 ..P WKT 2010 08 10 10 39 55 31.3200 -97.3300 251.000 122.0 89.710 4.520 -999.990 -999.990 0.897 ..P WKT 2010 08 10 10 44 55 31.3200 -97.3300 251.000 457.0 64.095 3.750 -999.990 -999.990 0.641 ..P WKT 2010 08 10 10 54 55 31.3200 -97.3300 251.000 30.0 81.854 4.290 -999.990 -999.990 0.819 ..P WKT 2010 08 10 10 59 55 31.3200 -97.3300 251.000 122.0 86.435 4.070 -999.990 -999.990 0.864 ..P WKT 2010 08 10 11 04 55 31.3200 -97.3300 251.000 457.0 66.715 3.680 -999.990 -999.990 0.667 ..P WKT 2010 08 10 11 09 55 31.3200 -97.3300 251.000 30.0 89.521 3.650 -999.990 -999.990 0.895 ..P WKT 2010 08 10 11 14 55 31.3200 -97.3300 251.000 122.0 87.199 3.900 -999.990 -999.990 0.872 ..P WKT 2010 08 10 11 19 55 31.3200 -97.3300 251.000 457.0 71.066 4.700 -999.990 -999.990 0.711 ..P WKT 2010 08 10 11 29 55 31.3200 -97.3300 251.000 30.0 88.322 4.110 -999.990 -999.990 0.883 ..P WKT 2010 08 10 11 34 55 31.3200 -97.3300 251.000 122.0 88.845 3.420 -999.990 -999.990 0.888 ..P WKT 2010 08 10 11 39 55 31.3200 -97.3300 251.000 457.0 77.490 3.160 -999.990 -999.990 0.775 ..P WKT 2010 08 10 11 44 55 31.3200 -97.3300 251.000 30.0 97.900 3.590 -999.990 -999.990 0.979 ..P WKT 2010 08 10 11 49 55 31.3200 -97.3300 251.000 122.0 87.373 4.410 -999.990 -999.990 0.874 ..P WKT 2010 08 10 12 09 55 31.3200 -97.3300 251.000 457.0 76.564 3.020 -999.990 -999.990 0.766 ..P WKT 2010 08 10 12 10 25 31.3200 -97.3300 251.000 457.0 77.622 2.800 -999.990 -999.990 0.776 ..P WKT 2010 08 10 12 10 55 31.3200 -97.3300 251.000 457.0 73.431 2.290 -999.990 -999.990 0.734 ..P WKT 2010 08 10 12 11 25 31.3200 -97.3300 251.000 457.0 78.357 2.360 -999.990 -999.990 0.784 ..P WKT 2010 08 10 12 11 55 31.3200 -97.3300 251.000 457.0 72.784 2.320 -999.990 -999.990 0.728 ..P WKT 2010 08 10 12 12 25 31.3200 -97.3300 251.000 457.0 75.500 2.740 -999.990 -999.990 0.755 ..P WKT 2010 08 10 12 12 55 31.3200 -97.3300 251.000 457.0 72.967 2.780 -999.990 -999.990 0.730 ..P WKT 2010 08 10 12 13 25 31.3200 -97.3300 251.000 457.0 73.472 2.570 -999.990 -999.990 0.735 ..P WKT 2010 08 10 12 13 55 31.3200 -97.3300 251.000 457.0 70.386 2.870 -999.990 -999.990 0.704 ..P WKT 2010 08 10 12 14 25 31.3200 -97.3300 251.000 457.0 69.510 2.660 -999.990 -999.990 0.695 ..P WKT 2010 08 10 12 14 55 31.3200 -97.3300 251.000 457.0 73.054 3.300 -999.990 -999.990 0.731 ..P WKT 2010 08 10 12 19 55 31.3200 -97.3300 251.000 30.0 92.756 4.830 -999.990 -999.990 0.928 ..P WKT 2010 08 10 12 24 55 31.3200 -97.3300 251.000 122.0 95.051 3.330 -999.990 -999.990 0.951 ..P WKT 2010 08 10 12 29 55 31.3200 -97.3300 251.000 457.0 68.603 3.300 -999.990 -999.990 0.686 ..P WKT 2010 08 10 12 34 55 31.3200 -97.3300 251.000 30.0 91.073 3.060 -999.990 -999.990 0.911 ..P WKT 2010 08 10 12 39 55 31.3200 -97.3300 251.000 122.0 95.579 3.390 -999.990 -999.990 0.956 ..P WKT 2010 08 10 12 44 55 31.3200 -97.3300 251.000 457.0 75.483 2.460 -999.990 -999.990 0.755 ..P WKT 2010 08 10 12 54 55 31.3200 -97.3300 251.000 30.0 91.375 3.220 -999.990 -999.990 0.914 ..P WKT 2010 08 10 12 59 55 31.3200 -97.3300 251.000 122.0 89.767 3.100 -999.990 -999.990 0.898 ..P WKT 2010 08 10 13 04 55 31.3200 -97.3300 251.000 457.0 63.824 3.000 -999.990 -999.990 0.638 ..P WKT 2010 08 10 13 09 55 31.3200 -97.3300 251.000 30.0 88.762 3.930 -999.990 -999.990 0.888 ..P WKT 2010 08 10 13 14 55 31.3200 -97.3300 251.000 122.0 85.494 3.290 -999.990 -999.990 0.855 ..P WKT 2010 08 10 13 19 55 31.3200 -97.3300 251.000 457.0 71.161 2.830 -999.990 -999.990 0.712 ..P WKT 2010 08 10 13 29 55 31.3200 -97.3300 251.000 30.0 88.412 3.190 -999.990 -999.990 0.884 ..P WKT 2010 08 10 13 34 55 31.3200 -97.3300 251.000 122.0 93.027 3.340 -999.990 -999.990 0.930 ..P WKT 2010 08 10 13 39 55 31.3200 -97.3300 251.000 457.0 75.371 3.640 -999.990 -999.990 0.754 ..P WKT 2010 08 10 13 44 55 31.3200 -97.3300 251.000 30.0 92.023 4.690 -999.990 -999.990 0.920 ..P WKT 2010 08 10 13 49 55 31.3200 -97.3300 251.000 122.0 94.149 2.830 -999.990 -999.990 0.941 ..P WKT 2010 08 10 13 54 55 31.3200 -97.3300 251.000 457.0 76.212 3.110 -999.990 -999.990 0.762 ..P WKT 2010 08 10 14 04 55 31.3200 -97.3300 251.000 30.0 92.148 3.160 -999.990 -999.990 0.921 ..P WKT 2010 08 10 14 09 55 31.3200 -97.3300 251.000 122.0 102.084 4.160 -999.990 -999.990 1.021 ..P WKT 2010 08 10 14 14 55 31.3200 -97.3300 251.000 457.0 77.419 3.270 -999.990 -999.990 0.774 ..P WKT 2010 08 10 14 19 55 31.3200 -97.3300 251.000 30.0 85.558 3.710 -999.990 -999.990 0.856 ..P WKT 2010 08 10 14 24 55 31.3200 -97.3300 251.000 122.0 102.003 4.530 -999.990 -999.990 1.020 ..P WKT 2010 08 10 14 29 55 31.3200 -97.3300 251.000 457.0 83.423 4.770 -999.990 -999.990 0.834 ..P WKT 2010 08 10 14 39 55 31.3200 -97.3300 251.000 30.0 83.346 4.620 -999.990 -999.990 0.833 ..P WKT 2010 08 10 14 44 55 31.3200 -97.3300 251.000 122.0 96.038 5.100 -999.990 -999.990 0.960 ..P WKT 2010 08 10 14 49 55 31.3200 -97.3300 251.000 457.0 75.493 3.700 -999.990 -999.990 0.755 ..P WKT 2010 08 10 14 54 55 31.3200 -97.3300 251.000 30.0 83.201 4.370 -999.990 -999.990 0.832 ..P WKT 2010 08 10 14 59 55 31.3200 -97.3300 251.000 122.0 89.663 3.290 -999.990 -999.990 0.897 ..P WKT 2010 08 10 15 04 55 31.3200 -97.3300 251.000 457.0 82.273 4.020 -999.990 -999.990 0.823 ..P WKT 2010 08 10 15 14 55 31.3200 -97.3300 251.000 30.0 85.896 3.020 -999.990 -999.990 0.859 ..P WKT 2010 08 10 15 19 55 31.3200 -97.3300 251.000 122.0 90.124 4.250 -999.990 -999.990 0.901 ..P WKT 2010 08 10 15 24 55 31.3200 -97.3300 251.000 457.0 75.506 3.920 -999.990 -999.990 0.755 ..P WKT 2010 08 10 15 29 55 31.3200 -97.3300 251.000 30.0 82.505 3.270 -999.990 -999.990 0.825 ..P WKT 2010 08 10 15 34 55 31.3200 -97.3300 251.000 122.0 94.494 3.340 -999.990 -999.990 0.945 ..P WKT 2010 08 10 15 39 55 31.3200 -97.3300 251.000 457.0 85.694 2.990 -999.990 -999.990 0.857 ..P WKT 2010 08 10 15 49 55 31.3200 -97.3300 251.000 30.0 81.320 3.850 -999.990 -999.990 0.813 ..P WKT 2010 08 10 15 54 55 31.3200 -97.3300 251.000 122.0 93.510 3.390 -999.990 -999.990 0.935 ..P WKT 2010 08 10 15 59 55 31.3200 -97.3300 251.000 457.0 84.352 3.290 -999.990 -999.990 0.844 ..P WKT 2010 08 10 16 04 55 31.3200 -97.3300 251.000 30.0 88.225 3.350 -999.990 -999.990 0.882 ..P WKT 2010 08 10 16 09 55 31.3200 -97.3300 251.000 122.0 99.865 5.480 -999.990 -999.990 0.999 ..P WKT 2010 08 10 16 14 55 31.3200 -97.3300 251.000 457.0 87.375 3.270 -999.990 -999.990 0.874 ..P WKT 2010 08 10 16 24 55 31.3200 -97.3300 251.000 30.0 87.180 4.010 -999.990 -999.990 0.872 ..P WKT 2010 08 10 16 29 55 31.3200 -97.3300 251.000 122.0 99.200 3.400 -999.990 -999.990 0.992 ..P WKT 2010 08 10 16 34 55 31.3200 -97.3300 251.000 457.0 92.077 3.950 -999.990 -999.990 0.921 ..P WKT 2010 08 10 16 39 55 31.3200 -97.3300 251.000 30.0 93.278 3.350 -999.990 -999.990 0.933 ..P WKT 2010 08 10 16 44 55 31.3200 -97.3300 251.000 122.0 101.139 3.220 -999.990 -999.990 1.011 ..P WKT 2010 08 10 16 49 55 31.3200 -97.3300 251.000 457.0 84.580 3.540 -999.990 -999.990 0.846 ..P WKT 2010 08 10 17 04 55 31.3200 -97.3300 251.000 30.0 84.236 4.530 -999.990 -999.990 0.842 ..P WKT 2010 08 10 17 09 55 31.3200 -97.3300 251.000 122.0 96.233 3.120 -999.990 -999.990 0.962 ..P WKT 2010 08 10 17 14 55 31.3200 -97.3300 251.000 457.0 83.524 3.370 -999.990 -999.990 0.835 ..P WKT 2010 08 10 17 19 55 31.3200 -97.3300 251.000 30.0 85.806 3.480 -999.990 -999.990 0.858 ..P WKT 2010 08 10 17 24 55 31.3200 -97.3300 251.000 122.0 100.305 3.430 -999.990 -999.990 1.003 ..P WKT 2010 08 10 17 29 55 31.3200 -97.3300 251.000 457.0 96.756 3.640 -999.990 -999.990 0.968 ..P WKT 2010 08 10 17 39 55 31.3200 -97.3300 251.000 30.0 99.230 3.850 -999.990 -999.990 0.992 ..P WKT 2010 08 10 17 44 55 31.3200 -97.3300 251.000 122.0 104.281 4.430 -999.990 -999.990 1.043 ..P WKT 2010 08 10 17 49 55 31.3200 -97.3300 251.000 457.0 80.307 4.420 -999.990 -999.990 0.803 ..P WKT 2010 08 10 17 54 55 31.3200 -97.3300 251.000 30.0 83.829 3.840 -999.990 -999.990 0.838 ..P WKT 2010 08 10 17 59 55 31.3200 -97.3300 251.000 122.0 95.965 4.840 -999.990 -999.990 0.960 ..P WKT 2010 08 10 18 04 55 31.3200 -97.3300 251.000 457.0 85.320 4.280 -999.990 -999.990 0.853 ..P WKT 2010 08 10 18 14 55 31.3200 -97.3300 251.000 30.0 80.480 4.200 -999.990 -999.990 0.805 ..P WKT 2010 08 10 18 19 55 31.3200 -97.3300 251.000 122.0 88.648 4.290 -999.990 -999.990 0.886 ..P WKT 2010 08 10 18 24 55 31.3200 -97.3300 251.000 457.0 83.756 4.520 -999.990 -999.990 0.838 ..P WKT 2010 08 10 18 29 55 31.3200 -97.3300 251.000 30.0 80.114 4.430 -999.990 -999.990 0.801 ..P WKT 2010 08 10 18 34 55 31.3200 -97.3300 251.000 122.0 84.672 3.570 -999.990 -999.990 0.847 ..P WKT 2010 08 10 18 39 55 31.3200 -97.3300 251.000 457.0 77.277 3.990 -999.990 -999.990 0.773 ..P WKT 2010 08 10 18 49 55 31.3200 -97.3300 251.000 30.0 79.760 4.280 -999.990 -999.990 0.798 ..P WKT 2010 08 10 18 54 55 31.3200 -97.3300 251.000 122.0 89.502 3.440 -999.990 -999.990 0.895 ..P WKT 2010 08 10 18 59 55 31.3200 -97.3300 251.000 457.0 82.562 3.760 -999.990 -999.990 0.826 ..P WKT 2010 08 10 19 04 55 31.3200 -97.3300 251.000 30.0 79.931 4.070 -999.990 -999.990 0.799 ..P WKT 2010 08 10 19 09 55 31.3200 -97.3300 251.000 122.0 90.371 4.960 -999.990 -999.990 0.904 ..P WKT 2010 08 10 19 14 55 31.3200 -97.3300 251.000 457.0 86.349 3.720 -999.990 -999.990 0.863 ..P WKT 2010 08 10 19 24 55 31.3200 -97.3300 251.000 30.0 79.378 4.250 -999.990 -999.990 0.794 ..P WKT 2010 08 10 19 29 55 31.3200 -97.3300 251.000 122.0 91.450 4.270 -999.990 -999.990 0.915 ..P WKT 2010 08 10 19 34 55 31.3200 -97.3300 251.000 457.0 82.101 5.440 -999.990 -999.990 0.821 ..P WKT 2010 08 10 19 39 55 31.3200 -97.3300 251.000 30.0 83.603 3.550 -999.990 -999.990 0.836 ..P WKT 2010 08 10 19 44 55 31.3200 -97.3300 251.000 122.0 97.070 4.290 -999.990 -999.990 0.971 ..P WKT 2010 08 10 19 49 55 31.3200 -97.3300 251.000 457.0 84.102 3.690 -999.990 -999.990 0.841 ..P WKT 2010 08 10 19 59 55 31.3200 -97.3300 251.000 30.0 86.549 3.410 -999.990 -999.990 0.865 ..P WKT 2010 08 10 20 04 55 31.3200 -97.3300 251.000 122.0 94.454 3.580 -999.990 -999.990 0.945 ..P WKT 2010 08 10 20 09 55 31.3200 -97.3300 251.000 457.0 88.162 4.620 -999.990 -999.990 0.882 ..P WKT 2010 08 10 20 14 55 31.3200 -97.3300 251.000 30.0 87.160 6.390 -999.990 -999.990 0.872 ..P WKT 2010 08 10 20 19 55 31.3200 -97.3300 251.000 122.0 103.697 5.100 -999.990 -999.990 1.037 ..P WKT 2010 08 10 20 24 55 31.3200 -97.3300 251.000 457.0 90.165 3.900 -999.990 -999.990 0.902 ..P WKT 2010 08 10 20 34 55 31.3200 -97.3300 251.000 30.0 84.181 4.110 -999.990 -999.990 0.842 ..P WKT 2010 08 10 20 39 55 31.3200 -97.3300 251.000 122.0 99.530 5.180 -999.990 -999.990 0.995 ..P WKT 2010 08 10 20 44 55 31.3200 -97.3300 251.000 457.0 88.421 5.240 -999.990 -999.990 0.884 ..P WKT 2010 08 10 20 49 55 31.3200 -97.3300 251.000 30.0 85.109 5.460 -999.990 -999.990 0.851 ..P WKT 2010 08 10 20 54 55 31.3200 -97.3300 251.000 122.0 90.155 4.780 -999.990 -999.990 0.902 ..P WKT 2010 08 10 20 59 55 31.3200 -97.3300 251.000 457.0 85.729 4.650 -999.990 -999.990 0.857 ..P WKT 2010 08 10 21 09 55 31.3200 -97.3300 251.000 30.0 79.323 4.160 -999.990 -999.990 0.793 ..P WKT 2010 08 10 21 14 55 31.3200 -97.3300 251.000 122.0 86.957 5.210 -999.990 -999.990 0.870 ..P WKT 2010 08 10 21 19 55 31.3200 -97.3300 251.000 457.0 84.280 5.230 -999.990 -999.990 0.843 ..P WKT 2010 08 10 21 24 55 31.3200 -97.3300 251.000 30.0 83.695 4.780 -999.990 -999.990 0.837 ..P WKT 2010 08 10 21 29 55 31.3200 -97.3300 251.000 122.0 92.585 4.620 -999.990 -999.990 0.926 ..P WKT 2010 08 10 21 34 55 31.3200 -97.3300 251.000 457.0 84.334 3.830 -999.990 -999.990 0.843 ..P WKT 2010 08 10 21 44 55 31.3200 -97.3300 251.000 30.0 87.224 4.230 -999.990 -999.990 0.872 ..P WKT 2010 08 10 21 49 55 31.3200 -97.3300 251.000 122.0 95.579 7.540 -999.990 -999.990 0.956 ..P WKT 2010 08 10 21 54 55 31.3200 -97.3300 251.000 457.0 84.697 4.830 -999.990 -999.990 0.847 ..P WKT 2010 08 10 21 59 55 31.3200 -97.3300 251.000 30.0 80.366 4.500 -999.990 -999.990 0.804 ..P WKT 2010 08 10 22 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 08 10 22 09 55 31.3200 -97.3300 251.000 457.0 82.160 3.990 -999.990 -999.990 0.822 ..P WKT 2010 08 10 22 19 55 31.3200 -97.3300 251.000 30.0 83.517 5.290 -999.990 -999.990 0.835 ..P WKT 2010 08 10 22 24 55 31.3200 -97.3300 251.000 122.0 87.254 4.050 -999.990 -999.990 0.873 ..P WKT 2010 08 10 22 29 55 31.3200 -97.3300 251.000 457.0 82.762 4.010 -999.990 -999.990 0.828 ..P WKT 2010 08 10 22 34 55 31.3200 -97.3300 251.000 30.0 79.664 4.500 -999.990 -999.990 0.797 ..P WKT 2010 08 10 22 39 55 31.3200 -97.3300 251.000 122.0 93.726 4.500 -999.990 -999.990 0.937 ..P WKT 2010 08 10 22 44 55 31.3200 -97.3300 251.000 457.0 81.698 5.790 -999.990 -999.990 0.817 ..P WKT 2010 08 10 22 54 55 31.3200 -97.3300 251.000 30.0 83.974 4.420 -999.990 -999.990 0.840 ..P WKT 2010 08 10 22 59 55 31.3200 -97.3300 251.000 122.0 94.371 4.770 -999.990 -999.990 0.944 ..P WKT 2010 08 10 23 04 55 31.3200 -97.3300 251.000 457.0 84.673 4.730 -999.990 -999.990 0.847 ..P WKT 2010 08 10 23 09 55 31.3200 -97.3300 251.000 30.0 81.953 5.000 -999.990 -999.990 0.820 ..P WKT 2010 08 10 23 14 55 31.3200 -97.3300 251.000 122.0 92.074 5.140 -999.990 -999.990 0.921 ..P WKT 2010 08 10 23 19 55 31.3200 -97.3300 251.000 457.0 90.192 5.920 -999.990 -999.990 0.902 ..P WKT 2010 08 10 23 29 55 31.3200 -97.3300 251.000 30.0 78.526 5.550 -999.990 -999.990 0.785 ..P WKT 2010 08 10 23 34 55 31.3200 -97.3300 251.000 122.0 98.066 5.220 -999.990 -999.990 0.981 ..P WKT 2010 08 10 23 39 55 31.3200 -97.3300 251.000 457.0 86.328 4.990 -999.990 -999.990 0.863 ..P WKT 2010 08 10 23 44 55 31.3200 -97.3300 251.000 30.0 79.895 5.020 -999.990 -999.990 0.799 ..P WKT 2010 08 10 23 49 55 31.3200 -97.3300 251.000 122.0 99.997 4.760 -999.990 -999.990 1.000 ..P WKT 2010 08 11 00 09 55 31.3200 -97.3300 251.000 457.0 83.503 4.180 -999.990 -999.990 0.835 ..P WKT 2010 08 11 00 10 25 31.3200 -97.3300 251.000 457.0 83.975 4.790 -999.990 -999.990 0.840 ..P WKT 2010 08 11 00 10 55 31.3200 -97.3300 251.000 457.0 84.167 6.060 -999.990 -999.990 0.842 ..P WKT 2010 08 11 00 11 25 31.3200 -97.3300 251.000 457.0 90.507 4.350 -999.990 -999.990 0.905 ..P WKT 2010 08 11 00 11 55 31.3200 -97.3300 251.000 457.0 88.184 4.260 -999.990 -999.990 0.882 ..P WKT 2010 08 11 00 12 25 31.3200 -97.3300 251.000 457.0 84.465 4.180 -999.990 -999.990 0.845 ..P WKT 2010 08 11 00 12 55 31.3200 -97.3300 251.000 457.0 87.172 4.270 -999.990 -999.990 0.872 ..P WKT 2010 08 11 00 13 25 31.3200 -97.3300 251.000 457.0 91.557 5.170 -999.990 -999.990 0.916 ..P WKT 2010 08 11 00 13 55 31.3200 -97.3300 251.000 457.0 90.351 4.650 -999.990 -999.990 0.904 ..P WKT 2010 08 11 00 14 25 31.3200 -97.3300 251.000 457.0 87.191 4.170 -999.990 -999.990 0.872 ..P WKT 2010 08 11 00 14 55 31.3200 -97.3300 251.000 457.0 89.060 4.330 -999.990 -999.990 0.891 ..P WKT 2010 08 11 00 19 55 31.3200 -97.3300 251.000 30.0 80.085 4.270 -999.990 -999.990 0.801 ..P WKT 2010 08 11 00 24 55 31.3200 -97.3300 251.000 122.0 88.159 4.590 -999.990 -999.990 0.882 ..P WKT 2010 08 11 00 29 55 31.3200 -97.3300 251.000 457.0 82.257 5.340 -999.990 -999.990 0.823 ..P WKT 2010 08 11 00 34 55 31.3200 -97.3300 251.000 30.0 77.473 5.810 -999.990 -999.990 0.775 ..P WKT 2010 08 11 00 39 55 31.3200 -97.3300 251.000 122.0 88.624 5.240 -999.990 -999.990 0.886 ..P WKT 2010 08 11 00 44 55 31.3200 -97.3300 251.000 457.0 84.118 5.030 -999.990 -999.990 0.841 ..P WKT 2010 08 11 00 54 55 31.3200 -97.3300 251.000 30.0 81.424 4.620 -999.990 -999.990 0.814 ..P WKT 2010 08 11 00 59 55 31.3200 -97.3300 251.000 122.0 85.614 4.830 -999.990 -999.990 0.856 ..P WKT 2010 08 11 01 04 55 31.3200 -97.3300 251.000 457.0 86.168 5.470 -999.990 -999.990 0.862 ..P WKT 2010 08 11 01 09 55 31.3200 -97.3300 251.000 30.0 85.604 4.600 -999.990 -999.990 0.856 ..P WKT 2010 08 11 01 14 55 31.3200 -97.3300 251.000 122.0 87.697 4.830 -999.990 -999.990 0.877 ..P WKT 2010 08 11 01 19 55 31.3200 -97.3300 251.000 457.0 87.832 4.460 -999.990 -999.990 0.878 ..P WKT 2010 08 11 01 29 55 31.3200 -97.3300 251.000 30.0 90.021 4.690 -999.990 -999.990 0.900 ..P WKT 2010 08 11 01 34 55 31.3200 -97.3300 251.000 122.0 93.755 4.440 -999.990 -999.990 0.938 ..P WKT 2010 08 11 01 39 55 31.3200 -97.3300 251.000 457.0 91.051 4.470 -999.990 -999.990 0.911 ..P WKT 2010 08 11 01 44 55 31.3200 -97.3300 251.000 30.0 83.449 4.620 -999.990 -999.990 0.834 ..P WKT 2010 08 11 01 49 55 31.3200 -97.3300 251.000 122.0 91.662 4.610 -999.990 -999.990 0.917 ..P WKT 2010 08 11 01 54 55 31.3200 -97.3300 251.000 457.0 86.298 4.740 -999.990 -999.990 0.863 ..P WKT 2010 08 11 02 04 55 31.3200 -97.3300 251.000 30.0 85.067 4.360 -999.990 -999.990 0.851 ..P WKT 2010 08 11 02 09 55 31.3200 -97.3300 251.000 122.0 91.724 4.830 -999.990 -999.990 0.917 ..P WKT 2010 08 11 02 14 55 31.3200 -97.3300 251.000 457.0 81.436 5.240 -999.990 -999.990 0.814 ..P WKT 2010 08 11 02 19 55 31.3200 -97.3300 251.000 30.0 89.913 5.830 -999.990 -999.990 0.899 ..P WKT 2010 08 11 02 24 55 31.3200 -97.3300 251.000 122.0 88.588 6.090 -999.990 -999.990 0.886 ..P WKT 2010 08 11 02 29 55 31.3200 -97.3300 251.000 457.0 82.500 5.960 -999.990 -999.990 0.825 ..P WKT 2010 08 11 02 39 55 31.3200 -97.3300 251.000 30.0 80.867 4.630 -999.990 -999.990 0.809 ..P WKT 2010 08 11 02 44 55 31.3200 -97.3300 251.000 122.0 89.389 4.880 -999.990 -999.990 0.894 ..P WKT 2010 08 11 02 49 55 31.3200 -97.3300 251.000 457.0 83.619 5.420 -999.990 -999.990 0.836 ..P WKT 2010 08 11 02 54 55 31.3200 -97.3300 251.000 30.0 86.677 4.960 -999.990 -999.990 0.867 ..P WKT 2010 08 11 02 59 55 31.3200 -97.3300 251.000 122.0 87.493 4.220 -999.990 -999.990 0.875 ..P WKT 2010 08 11 03 04 55 31.3200 -97.3300 251.000 457.0 86.066 4.880 -999.990 -999.990 0.861 ..P WKT 2010 08 11 03 14 55 31.3200 -97.3300 251.000 30.0 92.185 4.450 -999.990 -999.990 0.922 ..P WKT 2010 08 11 03 19 55 31.3200 -97.3300 251.000 122.0 93.002 3.900 -999.990 -999.990 0.930 ..P WKT 2010 08 11 03 24 55 31.3200 -97.3300 251.000 457.0 91.575 4.170 -999.990 -999.990 0.916 ..P WKT 2010 08 11 03 29 55 31.3200 -97.3300 251.000 30.0 89.587 5.170 -999.990 -999.990 0.896 ..P WKT 2010 08 11 03 34 55 31.3200 -97.3300 251.000 122.0 92.928 4.710 -999.990 -999.990 0.929 ..P WKT 2010 08 11 03 39 55 31.3200 -97.3300 251.000 457.0 92.904 4.070 -999.990 -999.990 0.929 ..P WKT 2010 08 11 03 49 55 31.3200 -97.3300 251.000 30.0 92.895 4.100 -999.990 -999.990 0.929 ..P WKT 2010 08 11 03 54 55 31.3200 -97.3300 251.000 122.0 96.559 3.990 -999.990 -999.990 0.966 ..P WKT 2010 08 11 03 59 55 31.3200 -97.3300 251.000 457.0 90.120 4.200 -999.990 -999.990 0.901 ..P WKT 2010 08 11 04 04 55 31.3200 -97.3300 251.000 30.0 89.013 4.120 -999.990 -999.990 0.890 ..P WKT 2010 08 11 04 09 55 31.3200 -97.3300 251.000 122.0 94.923 4.220 -999.990 -999.990 0.949 ..P WKT 2010 08 11 04 14 55 31.3200 -97.3300 251.000 457.0 86.516 4.570 -999.990 -999.990 0.865 ..P WKT 2010 08 11 04 24 55 31.3200 -97.3300 251.000 30.0 91.440 4.360 -999.990 -999.990 0.914 ..P WKT 2010 08 11 04 29 55 31.3200 -97.3300 251.000 122.0 94.945 4.310 -999.990 -999.990 0.949 ..P WKT 2010 08 11 04 34 55 31.3200 -97.3300 251.000 457.0 93.116 4.400 -999.990 -999.990 0.931 ..P WKT 2010 08 11 04 39 55 31.3200 -97.3300 251.000 30.0 93.533 4.590 -999.990 -999.990 0.935 ..P WKT 2010 08 11 04 44 55 31.3200 -97.3300 251.000 122.0 99.568 4.450 -999.990 -999.990 0.996 ..P WKT 2010 08 11 04 49 55 31.3200 -97.3300 251.000 457.0 94.367 4.930 -999.990 -999.990 0.944 ..P WKT 2010 08 11 05 04 55 31.3200 -97.3300 251.000 30.0 90.812 4.250 -999.990 -999.990 0.908 ..P WKT 2010 08 11 05 09 55 31.3200 -97.3300 251.000 122.0 89.317 5.390 -999.990 -999.990 0.893 ..P WKT 2010 08 11 05 14 55 31.3200 -97.3300 251.000 457.0 93.583 3.990 -999.990 -999.990 0.936 ..P WKT 2010 08 11 05 19 55 31.3200 -97.3300 251.000 30.0 92.088 4.730 -999.990 -999.990 0.921 ..P WKT 2010 08 11 05 24 55 31.3200 -97.3300 251.000 122.0 94.668 4.370 -999.990 -999.990 0.947 ..P WKT 2010 08 11 05 29 55 31.3200 -97.3300 251.000 457.0 92.751 4.020 -999.990 -999.990 0.928 ..P WKT 2010 08 11 05 39 55 31.3200 -97.3300 251.000 30.0 114.049 4.680 -999.990 -999.990 1.140 ..P WKT 2010 08 11 05 44 55 31.3200 -97.3300 251.000 122.0 95.505 4.100 -999.990 -999.990 0.955 ..P WKT 2010 08 11 05 49 55 31.3200 -97.3300 251.000 457.0 89.052 4.030 -999.990 -999.990 0.891 ..P WKT 2010 08 11 05 54 55 31.3200 -97.3300 251.000 30.0 103.272 4.240 -999.990 -999.990 1.033 ..P WKT 2010 08 11 05 59 55 31.3200 -97.3300 251.000 122.0 94.991 3.900 -999.990 -999.990 0.950 ..P WKT 2010 08 11 06 04 55 31.3200 -97.3300 251.000 457.0 86.988 3.780 -999.990 -999.990 0.870 ..P WKT 2010 08 11 06 14 55 31.3200 -97.3300 251.000 30.0 108.063 4.000 -999.990 -999.990 1.081 ..P WKT 2010 08 11 06 19 55 31.3200 -97.3300 251.000 122.0 95.778 3.810 -999.990 -999.990 0.958 ..P WKT 2010 08 11 06 24 55 31.3200 -97.3300 251.000 457.0 87.571 4.830 -999.990 -999.990 0.876 ..P WKT 2010 08 11 06 29 55 31.3200 -97.3300 251.000 30.0 104.414 4.040 -999.990 -999.990 1.044 ..P WKT 2010 08 11 06 34 55 31.3200 -97.3300 251.000 122.0 103.667 3.960 -999.990 -999.990 1.037 ..P WKT 2010 08 11 06 39 55 31.3200 -97.3300 251.000 457.0 97.993 3.730 -999.990 -999.990 0.980 ..P WKT 2010 08 11 06 49 55 31.3200 -97.3300 251.000 30.0 102.229 3.670 -999.990 -999.990 1.022 ..P WKT 2010 08 11 06 54 55 31.3200 -97.3300 251.000 122.0 144.246 5.040 -999.990 -999.990 1.442 ..P WKT 2010 08 11 06 59 55 31.3200 -97.3300 251.000 457.0 132.196 11.270 -999.990 -999.990 1.322 ..P WKT 2010 08 11 07 04 55 31.3200 -97.3300 251.000 30.0 101.836 4.760 -999.990 -999.990 1.018 ..P WKT 2010 08 11 07 09 55 31.3200 -97.3300 251.000 122.0 108.935 4.530 -999.990 -999.990 1.089 ..P WKT 2010 08 11 07 14 55 31.3200 -97.3300 251.000 457.0 85.328 4.290 -999.990 -999.990 0.853 ..P WKT 2010 08 11 07 24 55 31.3200 -97.3300 251.000 30.0 106.894 3.790 -999.990 -999.990 1.069 ..P WKT 2010 08 11 07 29 55 31.3200 -97.3300 251.000 122.0 91.774 4.240 -999.990 -999.990 0.918 ..P WKT 2010 08 11 07 34 55 31.3200 -97.3300 251.000 457.0 86.797 4.690 -999.990 -999.990 0.868 ..P WKT 2010 08 11 07 39 55 31.3200 -97.3300 251.000 30.0 101.831 4.350 -999.990 -999.990 1.018 ..P WKT 2010 08 11 07 44 55 31.3200 -97.3300 251.000 122.0 112.358 5.080 -999.990 -999.990 1.124 ..P WKT 2010 08 11 07 49 55 31.3200 -97.3300 251.000 457.0 89.903 3.910 -999.990 -999.990 0.899 ..P WKT 2010 08 11 07 59 55 31.3200 -97.3300 251.000 30.0 114.143 3.770 -999.990 -999.990 1.141 ..P WKT 2010 08 11 08 04 55 31.3200 -97.3300 251.000 122.0 110.938 6.510 -999.990 -999.990 1.109 ..P WKT 2010 08 11 08 09 55 31.3200 -97.3300 251.000 457.0 86.581 4.140 -999.990 -999.990 0.866 ..P WKT 2010 08 11 08 14 55 31.3200 -97.3300 251.000 30.0 110.449 4.060 -999.990 -999.990 1.104 ..P WKT 2010 08 11 08 19 55 31.3200 -97.3300 251.000 122.0 128.116 3.780 -999.990 -999.990 1.281 ..P WKT 2010 08 11 08 24 55 31.3200 -97.3300 251.000 457.0 86.545 3.640 -999.990 -999.990 0.865 ..P WKT 2010 08 11 08 34 55 31.3200 -97.3300 251.000 30.0 112.413 3.850 -999.990 -999.990 1.124 ..P WKT 2010 08 11 08 39 55 31.3200 -97.3300 251.000 122.0 119.767 3.490 -999.990 -999.990 1.198 ..P WKT 2010 08 11 08 44 55 31.3200 -97.3300 251.000 457.0 89.307 3.680 -999.990 -999.990 0.893 ..P WKT 2010 08 11 08 49 55 31.3200 -97.3300 251.000 30.0 109.643 4.310 -999.990 -999.990 1.096 ..P WKT 2010 08 11 08 54 55 31.3200 -97.3300 251.000 122.0 124.621 4.090 -999.990 -999.990 1.246 ..P WKT 2010 08 11 08 59 55 31.3200 -97.3300 251.000 457.0 87.942 3.850 -999.990 -999.990 0.879 ..P WKT 2010 08 11 09 09 55 31.3200 -97.3300 251.000 30.0 109.511 4.330 -999.990 -999.990 1.095 ..P WKT 2010 08 11 09 14 55 31.3200 -97.3300 251.000 122.0 115.963 4.470 -999.990 -999.990 1.160 ..P WKT 2010 08 11 09 19 55 31.3200 -97.3300 251.000 457.0 92.340 3.950 -999.990 -999.990 0.923 ..P WKT 2010 08 11 09 24 55 31.3200 -97.3300 251.000 30.0 108.535 4.320 -999.990 -999.990 1.085 ..P WKT 2010 08 11 09 29 55 31.3200 -97.3300 251.000 122.0 128.546 3.830 -999.990 -999.990 1.285 ..P WKT 2010 08 11 09 34 55 31.3200 -97.3300 251.000 457.0 94.747 3.560 -999.990 -999.990 0.947 ..P WKT 2010 08 11 09 44 55 31.3200 -97.3300 251.000 30.0 117.181 3.670 -999.990 -999.990 1.172 ..P WKT 2010 08 11 09 49 55 31.3200 -97.3300 251.000 122.0 105.613 4.160 -999.990 -999.990 1.056 ..P WKT 2010 08 11 09 54 55 31.3200 -97.3300 251.000 457.0 89.381 3.990 -999.990 -999.990 0.894 ..P WKT 2010 08 11 09 59 55 31.3200 -97.3300 251.000 30.0 114.692 4.660 -999.990 -999.990 1.147 ..P WKT 2010 08 11 10 04 55 31.3200 -97.3300 251.000 122.0 100.435 4.440 -999.990 -999.990 1.004 ..P WKT 2010 08 11 10 09 55 31.3200 -97.3300 251.000 457.0 84.056 4.490 -999.990 -999.990 0.841 ..P WKT 2010 08 11 10 19 55 31.3200 -97.3300 251.000 30.0 110.865 4.270 -999.990 -999.990 1.109 ..P WKT 2010 08 11 10 24 55 31.3200 -97.3300 251.000 122.0 100.481 4.550 -999.990 -999.990 1.005 ..P WKT 2010 08 11 10 29 55 31.3200 -97.3300 251.000 457.0 84.722 4.440 -999.990 -999.990 0.847 ..P WKT 2010 08 11 10 34 55 31.3200 -97.3300 251.000 30.0 116.756 4.110 -999.990 -999.990 1.168 ..P WKT 2010 08 11 10 39 55 31.3200 -97.3300 251.000 122.0 102.127 4.160 -999.990 -999.990 1.021 ..P WKT 2010 08 11 10 44 55 31.3200 -97.3300 251.000 457.0 88.485 3.960 -999.990 -999.990 0.885 ..P WKT 2010 08 11 10 54 55 31.3200 -97.3300 251.000 30.0 134.774 3.850 -999.990 -999.990 1.348 ..P WKT 2010 08 11 10 59 55 31.3200 -97.3300 251.000 122.0 101.203 3.730 -999.990 -999.990 1.012 ..P WKT 2010 08 11 11 04 55 31.3200 -97.3300 251.000 457.0 89.981 4.060 -999.990 -999.990 0.900 ..P WKT 2010 08 11 11 09 55 31.3200 -97.3300 251.000 30.0 116.114 3.670 -999.990 -999.990 1.161 ..P WKT 2010 08 11 11 14 55 31.3200 -97.3300 251.000 122.0 95.269 3.320 -999.990 -999.990 0.953 ..P WKT 2010 08 11 11 19 55 31.3200 -97.3300 251.000 457.0 86.307 3.130 -999.990 -999.990 0.863 ..P WKT 2010 08 11 11 29 55 31.3200 -97.3300 251.000 30.0 122.729 3.330 -999.990 -999.990 1.227 ..P WKT 2010 08 11 11 34 55 31.3200 -97.3300 251.000 122.0 99.599 3.830 -999.990 -999.990 0.996 ..P WKT 2010 08 11 11 39 55 31.3200 -97.3300 251.000 457.0 92.890 3.800 -999.990 -999.990 0.929 ..P WKT 2010 08 11 11 44 55 31.3200 -97.3300 251.000 30.0 124.413 4.060 -999.990 -999.990 1.244 ..P WKT 2010 08 11 11 49 55 31.3200 -97.3300 251.000 122.0 104.110 3.570 -999.990 -999.990 1.041 ..P WKT 2010 08 11 12 09 55 31.3200 -97.3300 251.000 457.0 87.042 4.030 -999.990 -999.990 0.870 ..P WKT 2010 08 11 12 10 25 31.3200 -97.3300 251.000 457.0 90.722 4.450 -999.990 -999.990 0.907 ..P WKT 2010 08 11 12 10 55 31.3200 -97.3300 251.000 457.0 88.172 4.600 -999.990 -999.990 0.882 ..P WKT 2010 08 11 12 11 25 31.3200 -97.3300 251.000 457.0 86.189 4.130 -999.990 -999.990 0.862 ..P WKT 2010 08 11 12 11 55 31.3200 -97.3300 251.000 457.0 84.490 4.290 -999.990 -999.990 0.845 ..P WKT 2010 08 11 12 12 25 31.3200 -97.3300 251.000 457.0 88.452 3.960 -999.990 -999.990 0.885 ..P WKT 2010 08 11 12 12 55 31.3200 -97.3300 251.000 457.0 84.770 3.630 -999.990 -999.990 0.848 ..P WKT 2010 08 11 12 13 25 31.3200 -97.3300 251.000 457.0 86.751 4.180 -999.990 -999.990 0.868 ..P WKT 2010 08 11 12 13 55 31.3200 -97.3300 251.000 457.0 87.600 3.690 -999.990 -999.990 0.876 ..P WKT 2010 08 11 12 14 25 31.3200 -97.3300 251.000 457.0 87.032 4.320 -999.990 -999.990 0.870 ..P WKT 2010 08 11 12 14 55 31.3200 -97.3300 251.000 457.0 85.332 3.970 -999.990 -999.990 0.853 ..P WKT 2010 08 11 12 19 55 31.3200 -97.3300 251.000 30.0 155.512 5.300 -999.990 -999.990 1.555 ..P WKT 2010 08 11 12 24 55 31.3200 -97.3300 251.000 122.0 103.136 3.700 -999.990 -999.990 1.031 ..P WKT 2010 08 11 12 29 55 31.3200 -97.3300 251.000 457.0 87.845 4.320 -999.990 -999.990 0.878 ..P WKT 2010 08 11 12 34 55 31.3200 -97.3300 251.000 30.0 111.873 4.350 -999.990 -999.990 1.119 ..P WKT 2010 08 11 12 39 55 31.3200 -97.3300 251.000 122.0 108.322 3.390 -999.990 -999.990 1.083 ..P WKT 2010 08 11 12 44 55 31.3200 -97.3300 251.000 457.0 86.680 3.490 -999.990 -999.990 0.867 ..P WKT 2010 08 11 12 54 55 31.3200 -97.3300 251.000 30.0 141.836 3.710 -999.990 -999.990 1.418 ..P WKT 2010 08 11 12 59 55 31.3200 -97.3300 251.000 122.0 110.677 3.290 -999.990 -999.990 1.107 ..P WKT 2010 08 11 13 04 55 31.3200 -97.3300 251.000 457.0 84.051 5.030 -999.990 -999.990 0.841 ..P WKT 2010 08 11 13 09 55 31.3200 -97.3300 251.000 30.0 139.606 4.040 -999.990 -999.990 1.396 ..P WKT 2010 08 11 13 14 55 31.3200 -97.3300 251.000 122.0 114.538 4.810 -999.990 -999.990 1.145 ..P WKT 2010 08 11 13 19 55 31.3200 -97.3300 251.000 457.0 84.402 4.780 -999.990 -999.990 0.844 ..P WKT 2010 08 11 13 29 55 31.3200 -97.3300 251.000 30.0 124.921 4.080 -999.990 -999.990 1.249 ..P WKT 2010 08 11 13 34 55 31.3200 -97.3300 251.000 122.0 126.855 4.000 -999.990 -999.990 1.269 ..P WKT 2010 08 11 13 39 55 31.3200 -97.3300 251.000 457.0 88.749 4.300 -999.990 -999.990 0.887 ..P WKT 2010 08 11 13 44 55 31.3200 -97.3300 251.000 30.0 120.713 4.410 -999.990 -999.990 1.207 ..P WKT 2010 08 11 13 49 55 31.3200 -97.3300 251.000 122.0 117.151 3.850 -999.990 -999.990 1.172 ..P WKT 2010 08 11 13 54 55 31.3200 -97.3300 251.000 457.0 89.218 5.010 -999.990 -999.990 0.892 ..P WKT 2010 08 11 14 04 55 31.3200 -97.3300 251.000 30.0 113.253 4.150 -999.990 -999.990 1.133 ..P WKT 2010 08 11 14 09 55 31.3200 -97.3300 251.000 122.0 125.061 4.530 -999.990 -999.990 1.251 ..P WKT 2010 08 11 14 14 55 31.3200 -97.3300 251.000 457.0 94.076 4.360 -999.990 -999.990 0.941 ..P WKT 2010 08 11 14 19 55 31.3200 -97.3300 251.000 30.0 111.934 4.710 -999.990 -999.990 1.119 ..P WKT 2010 08 11 14 24 55 31.3200 -97.3300 251.000 122.0 114.871 3.530 -999.990 -999.990 1.149 ..P WKT 2010 08 11 14 29 55 31.3200 -97.3300 251.000 457.0 91.505 4.330 -999.990 -999.990 0.915 ..P WKT 2010 08 11 14 39 55 31.3200 -97.3300 251.000 30.0 108.310 3.350 -999.990 -999.990 1.083 ..P WKT 2010 08 11 14 44 55 31.3200 -97.3300 251.000 122.0 115.843 3.540 -999.990 -999.990 1.158 ..P WKT 2010 08 11 14 49 55 31.3200 -97.3300 251.000 457.0 101.171 3.660 -999.990 -999.990 1.012 ..P WKT 2010 08 11 14 54 55 31.3200 -97.3300 251.000 30.0 106.735 3.980 -999.990 -999.990 1.067 ..P WKT 2010 08 11 14 59 55 31.3200 -97.3300 251.000 122.0 114.264 4.650 -999.990 -999.990 1.143 ..P WKT 2010 08 11 15 04 55 31.3200 -97.3300 251.000 457.0 99.321 5.220 -999.990 -999.990 0.993 ..P WKT 2010 08 11 15 14 55 31.3200 -97.3300 251.000 30.0 105.148 4.580 -999.990 -999.990 1.051 ..P WKT 2010 08 11 15 19 55 31.3200 -97.3300 251.000 122.0 106.535 7.140 -999.990 -999.990 1.065 ..P WKT 2010 08 11 15 24 55 31.3200 -97.3300 251.000 457.0 102.592 4.960 -999.990 -999.990 1.026 ..P WKT 2010 08 11 15 29 55 31.3200 -97.3300 251.000 30.0 101.735 4.580 -999.990 -999.990 1.017 ..P WKT 2010 08 11 15 34 55 31.3200 -97.3300 251.000 122.0 117.425 5.310 -999.990 -999.990 1.174 ..P WKT 2010 08 11 15 39 55 31.3200 -97.3300 251.000 457.0 107.594 4.000 -999.990 -999.990 1.076 ..P WKT 2010 08 11 15 49 55 31.3200 -97.3300 251.000 30.0 102.196 4.860 -999.990 -999.990 1.022 ..P WKT 2010 08 11 15 54 55 31.3200 -97.3300 251.000 122.0 115.310 3.850 -999.990 -999.990 1.153 ..P WKT 2010 08 11 15 59 55 31.3200 -97.3300 251.000 457.0 107.409 4.250 -999.990 -999.990 1.074 ..P WKT 2010 08 11 16 04 55 31.3200 -97.3300 251.000 30.0 93.630 3.620 -999.990 -999.990 0.936 ..P WKT 2010 08 11 16 09 55 31.3200 -97.3300 251.000 122.0 106.177 3.690 -999.990 -999.990 1.062 ..P WKT 2010 08 11 16 14 55 31.3200 -97.3300 251.000 457.0 107.521 4.600 -999.990 -999.990 1.075 ..P WKT 2010 08 11 16 24 55 31.3200 -97.3300 251.000 30.0 96.156 3.590 -999.990 -999.990 0.962 ..P WKT 2010 08 11 16 29 55 31.3200 -97.3300 251.000 122.0 114.786 3.780 -999.990 -999.990 1.148 ..P WKT 2010 08 11 16 34 55 31.3200 -97.3300 251.000 457.0 101.523 4.040 -999.990 -999.990 1.015 ..P WKT 2010 08 11 16 39 55 31.3200 -97.3300 251.000 30.0 102.108 3.980 -999.990 -999.990 1.021 ..P WKT 2010 08 11 16 44 55 31.3200 -97.3300 251.000 122.0 125.055 4.380 -999.990 -999.990 1.251 ..P WKT 2010 08 11 16 49 55 31.3200 -97.3300 251.000 457.0 101.878 4.310 -999.990 -999.990 1.019 ..P WKT 2010 08 11 17 04 55 31.3200 -97.3300 251.000 30.0 103.620 3.880 -999.990 -999.990 1.036 ..P WKT 2010 08 11 17 09 55 31.3200 -97.3300 251.000 122.0 121.928 4.000 -999.990 -999.990 1.219 ..P WKT 2010 08 11 17 14 55 31.3200 -97.3300 251.000 457.0 102.682 3.920 -999.990 -999.990 1.027 ..P WKT 2010 08 11 17 19 55 31.3200 -97.3300 251.000 30.0 100.051 3.730 -999.990 -999.990 1.001 ..P WKT 2010 08 11 17 24 55 31.3200 -97.3300 251.000 122.0 118.766 4.380 -999.990 -999.990 1.188 ..P WKT 2010 08 11 17 29 55 31.3200 -97.3300 251.000 457.0 109.298 3.110 -999.990 -999.990 1.093 ..P WKT 2010 08 11 17 39 55 31.3200 -97.3300 251.000 30.0 100.994 3.410 -999.990 -999.990 1.010 ..P WKT 2010 08 11 17 44 55 31.3200 -97.3300 251.000 122.0 119.856 3.520 -999.990 -999.990 1.199 ..P WKT 2010 08 11 17 49 55 31.3200 -97.3300 251.000 457.0 104.150 3.620 -999.990 -999.990 1.042 ..P WKT 2010 08 11 17 54 55 31.3200 -97.3300 251.000 30.0 103.498 3.720 -999.990 -999.990 1.035 ..P WKT 2010 08 11 17 59 55 31.3200 -97.3300 251.000 122.0 121.371 4.130 -999.990 -999.990 1.214 ..P WKT 2010 08 11 18 04 55 31.3200 -97.3300 251.000 457.0 102.056 4.380 -999.990 -999.990 1.021 ..P WKT 2010 08 11 18 14 55 31.3200 -97.3300 251.000 30.0 99.004 5.290 -999.990 -999.990 0.990 ..P WKT 2010 08 11 18 19 55 31.3200 -97.3300 251.000 122.0 109.268 5.570 -999.990 -999.990 1.093 ..P WKT 2010 08 11 18 24 55 31.3200 -97.3300 251.000 457.0 103.944 4.280 -999.990 -999.990 1.039 ..P WKT 2010 08 11 18 29 55 31.3200 -97.3300 251.000 30.0 99.458 3.800 -999.990 -999.990 0.995 ..P WKT 2010 08 11 18 34 55 31.3200 -97.3300 251.000 122.0 106.239 5.160 -999.990 -999.990 1.062 ..P WKT 2010 08 11 18 39 55 31.3200 -97.3300 251.000 457.0 97.306 4.520 -999.990 -999.990 0.973 ..P WKT 2010 08 11 18 49 55 31.3200 -97.3300 251.000 30.0 100.236 2.980 -999.990 -999.990 1.002 ..P WKT 2010 08 11 18 54 55 31.3200 -97.3300 251.000 122.0 115.980 4.400 -999.990 -999.990 1.160 ..P WKT 2010 08 11 18 59 55 31.3200 -97.3300 251.000 457.0 106.438 3.760 -999.990 -999.990 1.064 ..P WKT 2010 08 11 19 04 55 31.3200 -97.3300 251.000 30.0 105.788 3.600 -999.990 -999.990 1.058 ..P WKT 2010 08 11 19 09 55 31.3200 -97.3300 251.000 122.0 114.855 3.040 -999.990 -999.990 1.149 ..P WKT 2010 08 11 19 14 55 31.3200 -97.3300 251.000 457.0 112.260 3.330 -999.990 -999.990 1.123 ..P WKT 2010 08 11 19 24 55 31.3200 -97.3300 251.000 30.0 110.126 2.820 -999.990 -999.990 1.101 ..P WKT 2010 08 11 19 29 55 31.3200 -97.3300 251.000 122.0 121.404 2.810 -999.990 -999.990 1.214 ..P WKT 2010 08 11 19 34 55 31.3200 -97.3300 251.000 457.0 111.598 3.720 -999.990 -999.990 1.116 ..P WKT 2010 08 11 19 39 55 31.3200 -97.3300 251.000 30.0 110.947 3.400 -999.990 -999.990 1.109 ..P WKT 2010 08 11 19 44 55 31.3200 -97.3300 251.000 122.0 122.772 3.950 -999.990 -999.990 1.228 ..P WKT 2010 08 11 19 49 55 31.3200 -97.3300 251.000 457.0 116.021 2.910 -999.990 -999.990 1.160 ..P WKT 2010 08 11 19 59 55 31.3200 -97.3300 251.000 30.0 102.946 4.600 -999.990 -999.990 1.029 ..P WKT 2010 08 11 20 04 55 31.3200 -97.3300 251.000 122.0 125.701 3.280 -999.990 -999.990 1.257 ..P WKT 2010 08 11 20 09 55 31.3200 -97.3300 251.000 457.0 113.280 3.240 -999.990 -999.990 1.133 ..P WKT 2010 08 11 20 14 55 31.3200 -97.3300 251.000 30.0 104.740 3.570 -999.990 -999.990 1.047 ..P WKT 2010 08 11 20 19 55 31.3200 -97.3300 251.000 122.0 120.837 3.400 -999.990 -999.990 1.208 ..P WKT 2010 08 11 20 24 55 31.3200 -97.3300 251.000 457.0 106.765 2.670 -999.990 -999.990 1.068 ..P WKT 2010 08 11 20 34 55 31.3200 -97.3300 251.000 30.0 108.255 2.940 -999.990 -999.990 1.083 ..P WKT 2010 08 11 20 39 55 31.3200 -97.3300 251.000 122.0 116.890 3.450 -999.990 -999.990 1.169 ..P WKT 2010 08 11 20 44 55 31.3200 -97.3300 251.000 457.0 111.698 2.920 -999.990 -999.990 1.117 ..P WKT 2010 08 11 20 49 55 31.3200 -97.3300 251.000 30.0 111.898 2.800 -999.990 -999.990 1.119 ..P WKT 2010 08 11 20 54 55 31.3200 -97.3300 251.000 122.0 119.006 3.410 -999.990 -999.990 1.190 ..P WKT 2010 08 11 20 59 55 31.3200 -97.3300 251.000 457.0 112.436 2.640 -999.990 -999.990 1.124 ..P WKT 2010 08 11 21 09 55 31.3200 -97.3300 251.000 30.0 113.408 2.750 -999.990 -999.990 1.134 ..P WKT 2010 08 11 21 14 55 31.3200 -97.3300 251.000 122.0 123.428 3.210 -999.990 -999.990 1.234 ..P WKT 2010 08 11 21 19 55 31.3200 -97.3300 251.000 457.0 114.261 3.070 -999.990 -999.990 1.143 ..P WKT 2010 08 11 21 24 55 31.3200 -97.3300 251.000 30.0 112.687 3.650 -999.990 -999.990 1.127 ..P WKT 2010 08 11 21 29 55 31.3200 -97.3300 251.000 122.0 119.114 3.380 -999.990 -999.990 1.191 ..P WKT 2010 08 11 21 34 55 31.3200 -97.3300 251.000 457.0 112.574 2.600 -999.990 -999.990 1.126 ..P WKT 2010 08 11 21 44 55 31.3200 -97.3300 251.000 30.0 115.002 2.730 -999.990 -999.990 1.150 ..P WKT 2010 08 11 21 49 55 31.3200 -97.3300 251.000 122.0 123.961 3.020 -999.990 -999.990 1.240 ..P WKT 2010 08 11 21 54 55 31.3200 -97.3300 251.000 457.0 115.143 3.190 -999.990 -999.990 1.151 ..P WKT 2010 08 11 21 59 55 31.3200 -97.3300 251.000 30.0 115.145 3.510 -999.990 -999.990 1.151 ..P WKT 2010 08 11 22 04 55 31.3200 -97.3300 251.000 122.0 123.686 3.060 -999.990 -999.990 1.237 ..P WKT 2010 08 11 22 09 55 31.3200 -97.3300 251.000 457.0 116.526 2.820 -999.990 -999.990 1.165 ..P WKT 2010 08 11 22 19 55 31.3200 -97.3300 251.000 30.0 115.999 2.840 -999.990 -999.990 1.160 ..P WKT 2010 08 11 22 24 55 31.3200 -97.3300 251.000 122.0 119.047 3.340 -999.990 -999.990 1.190 ..P WKT 2010 08 11 22 29 55 31.3200 -97.3300 251.000 457.0 109.439 2.770 -999.990 -999.990 1.094 ..P WKT 2010 08 11 22 34 55 31.3200 -97.3300 251.000 30.0 109.737 3.030 -999.990 -999.990 1.097 ..P WKT 2010 08 11 22 39 55 31.3200 -97.3300 251.000 122.0 116.911 3.010 -999.990 -999.990 1.169 ..P WKT 2010 08 11 22 44 55 31.3200 -97.3300 251.000 457.0 111.433 2.950 -999.990 -999.990 1.114 ..P WKT 2010 08 11 22 54 55 31.3200 -97.3300 251.000 30.0 116.190 2.560 -999.990 -999.990 1.162 ..P WKT 2010 08 11 22 59 55 31.3200 -97.3300 251.000 122.0 128.888 2.490 -999.990 -999.990 1.289 ..P WKT 2010 08 11 23 04 55 31.3200 -97.3300 251.000 457.0 118.783 2.700 -999.990 -999.990 1.188 ..P WKT 2010 08 11 23 09 55 31.3200 -97.3300 251.000 30.0 115.548 2.960 -999.990 -999.990 1.155 ..P WKT 2010 08 11 23 14 55 31.3200 -97.3300 251.000 122.0 129.885 2.480 -999.990 -999.990 1.299 ..P WKT 2010 08 11 23 19 55 31.3200 -97.3300 251.000 457.0 110.179 2.260 -999.990 -999.990 1.102 ..P WKT 2010 08 11 23 29 55 31.3200 -97.3300 251.000 30.0 109.230 2.710 -999.990 -999.990 1.092 ..P WKT 2010 08 11 23 34 55 31.3200 -97.3300 251.000 122.0 115.078 2.390 -999.990 -999.990 1.151 ..P WKT 2010 08 11 23 39 55 31.3200 -97.3300 251.000 457.0 112.969 2.780 -999.990 -999.990 1.130 ..P WKT 2010 08 11 23 44 55 31.3200 -97.3300 251.000 30.0 105.104 2.720 -999.990 -999.990 1.051 ..P WKT 2010 08 11 23 49 55 31.3200 -97.3300 251.000 122.0 117.252 4.580 -999.990 -999.990 1.173 ..P WKT 2010 08 12 00 09 55 31.3200 -97.3300 251.000 457.0 112.595 2.600 -999.990 -999.990 1.126 ..P WKT 2010 08 12 00 10 25 31.3200 -97.3300 251.000 457.0 113.664 3.130 -999.990 -999.990 1.137 ..P WKT 2010 08 12 00 10 55 31.3200 -97.3300 251.000 457.0 119.665 2.640 -999.990 -999.990 1.197 ..P WKT 2010 08 12 00 11 25 31.3200 -97.3300 251.000 457.0 114.980 2.630 -999.990 -999.990 1.150 ..P WKT 2010 08 12 00 11 55 31.3200 -97.3300 251.000 457.0 119.064 2.820 -999.990 -999.990 1.191 ..P WKT 2010 08 12 00 12 25 31.3200 -97.3300 251.000 457.0 117.940 3.650 -999.990 -999.990 1.179 ..P WKT 2010 08 12 00 12 55 31.3200 -97.3300 251.000 457.0 115.172 2.620 -999.990 -999.990 1.152 ..P WKT 2010 08 12 00 13 25 31.3200 -97.3300 251.000 457.0 110.212 2.930 -999.990 -999.990 1.102 ..P WKT 2010 08 12 00 13 55 31.3200 -97.3300 251.000 457.0 118.680 3.280 -999.990 -999.990 1.187 ..P WKT 2010 08 12 00 14 25 31.3200 -97.3300 251.000 457.0 107.692 2.600 -999.990 -999.990 1.077 ..P WKT 2010 08 12 00 14 55 31.3200 -97.3300 251.000 457.0 111.227 2.820 -999.990 -999.990 1.112 ..P WKT 2010 08 12 00 19 55 31.3200 -97.3300 251.000 30.0 106.296 3.150 -999.990 -999.990 1.063 ..P WKT 2010 08 12 00 24 55 31.3200 -97.3300 251.000 122.0 112.602 3.490 -999.990 -999.990 1.126 ..P WKT 2010 08 12 00 29 55 31.3200 -97.3300 251.000 457.0 117.127 3.190 -999.990 -999.990 1.171 ..P WKT 2010 08 12 00 34 55 31.3200 -97.3300 251.000 30.0 110.550 4.930 -999.990 -999.990 1.105 ..P WKT 2010 08 12 00 39 55 31.3200 -97.3300 251.000 122.0 116.583 3.090 -999.990 -999.990 1.166 ..P WKT 2010 08 12 00 44 55 31.3200 -97.3300 251.000 457.0 116.174 3.820 -999.990 -999.990 1.162 ..P WKT 2010 08 12 00 54 55 31.3200 -97.3300 251.000 30.0 106.680 3.440 -999.990 -999.990 1.067 ..P WKT 2010 08 12 00 59 55 31.3200 -97.3300 251.000 122.0 119.532 3.530 -999.990 -999.990 1.195 ..P WKT 2010 08 12 01 04 55 31.3200 -97.3300 251.000 457.0 114.833 3.750 -999.990 -999.990 1.148 ..P WKT 2010 08 12 01 09 55 31.3200 -97.3300 251.000 30.0 116.441 3.090 -999.990 -999.990 1.164 ..P WKT 2010 08 12 01 14 55 31.3200 -97.3300 251.000 122.0 122.851 3.010 -999.990 -999.990 1.229 ..P WKT 2010 08 12 01 19 55 31.3200 -97.3300 251.000 457.0 116.780 4.130 -999.990 -999.990 1.168 ..P WKT 2010 08 12 01 29 55 31.3200 -97.3300 251.000 30.0 119.077 3.790 -999.990 -999.990 1.191 ..P WKT 2010 08 12 01 34 55 31.3200 -97.3300 251.000 122.0 109.202 3.150 -999.990 -999.990 1.092 ..P WKT 2010 08 12 01 39 55 31.3200 -97.3300 251.000 457.0 117.711 3.600 -999.990 -999.990 1.177 ..P WKT 2010 08 12 01 44 55 31.3200 -97.3300 251.000 30.0 106.187 3.150 -999.990 -999.990 1.062 ..P WKT 2010 08 12 01 49 55 31.3200 -97.3300 251.000 122.0 115.245 3.420 -999.990 -999.990 1.152 ..P WKT 2010 08 12 01 54 55 31.3200 -97.3300 251.000 457.0 110.856 4.070 -999.990 -999.990 1.109 ..P WKT 2010 08 12 02 04 55 31.3200 -97.3300 251.000 30.0 102.311 3.770 -999.990 -999.990 1.023 ..P WKT 2010 08 12 02 09 55 31.3200 -97.3300 251.000 122.0 113.530 3.690 -999.990 -999.990 1.135 ..P WKT 2010 08 12 02 14 55 31.3200 -97.3300 251.000 457.0 108.825 3.810 -999.990 -999.990 1.088 ..P WKT 2010 08 12 02 19 55 31.3200 -97.3300 251.000 30.0 106.454 4.060 -999.990 -999.990 1.065 ..P WKT 2010 08 12 02 24 55 31.3200 -97.3300 251.000 122.0 108.064 3.680 -999.990 -999.990 1.081 ..P WKT 2010 08 12 02 29 55 31.3200 -97.3300 251.000 457.0 113.244 2.720 -999.990 -999.990 1.132 ..P WKT 2010 08 12 02 39 55 31.3200 -97.3300 251.000 30.0 114.190 2.340 -999.990 -999.990 1.142 ..P WKT 2010 08 12 02 44 55 31.3200 -97.3300 251.000 122.0 115.174 3.580 -999.990 -999.990 1.152 ..P WKT 2010 08 12 02 49 55 31.3200 -97.3300 251.000 457.0 111.762 2.670 -999.990 -999.990 1.118 ..P WKT 2010 08 12 02 54 55 31.3200 -97.3300 251.000 30.0 102.306 3.720 -999.990 -999.990 1.023 ..P WKT 2010 08 12 02 59 55 31.3200 -97.3300 251.000 122.0 117.025 3.570 -999.990 -999.990 1.170 ..P WKT 2010 08 12 03 04 55 31.3200 -97.3300 251.000 457.0 117.460 5.250 -999.990 -999.990 1.175 ..P WKT 2010 08 12 03 14 55 31.3200 -97.3300 251.000 30.0 109.574 2.540 -999.990 -999.990 1.096 ..P WKT 2010 08 12 03 19 55 31.3200 -97.3300 251.000 122.0 119.117 3.330 -999.990 -999.990 1.191 ..P WKT 2010 08 12 03 24 55 31.3200 -97.3300 251.000 457.0 113.269 2.720 -999.990 -999.990 1.133 ..P WKT 2010 08 12 03 29 55 31.3200 -97.3300 251.000 30.0 107.145 4.100 -999.990 -999.990 1.071 ..P WKT 2010 08 12 03 34 55 31.3200 -97.3300 251.000 122.0 118.065 3.010 -999.990 -999.990 1.181 ..P WKT 2010 08 12 03 39 55 31.3200 -97.3300 251.000 457.0 126.786 3.410 -999.990 -999.990 1.268 ..P WKT 2010 08 12 03 49 55 31.3200 -97.3300 251.000 30.0 112.102 3.230 -999.990 -999.990 1.121 ..P WKT 2010 08 12 03 54 55 31.3200 -97.3300 251.000 122.0 120.039 3.100 -999.990 -999.990 1.200 ..P WKT 2010 08 12 03 59 55 31.3200 -97.3300 251.000 457.0 125.227 3.110 -999.990 -999.990 1.252 ..P WKT 2010 08 12 04 04 55 31.3200 -97.3300 251.000 30.0 114.740 4.110 -999.990 -999.990 1.147 ..P WKT 2010 08 12 04 09 55 31.3200 -97.3300 251.000 122.0 129.281 4.100 -999.990 -999.990 1.293 ..P WKT 2010 08 12 04 14 55 31.3200 -97.3300 251.000 457.0 129.520 5.530 -999.990 -999.990 1.295 ..P WKT 2010 08 12 04 24 55 31.3200 -97.3300 251.000 30.0 114.652 3.800 -999.990 -999.990 1.147 ..P WKT 2010 08 12 04 29 55 31.3200 -97.3300 251.000 122.0 125.403 3.980 -999.990 -999.990 1.254 ..P WKT 2010 08 12 04 34 55 31.3200 -97.3300 251.000 457.0 138.495 3.270 -999.990 -999.990 1.385 ..P WKT 2010 08 12 04 39 55 31.3200 -97.3300 251.000 30.0 118.570 4.280 -999.990 -999.990 1.186 ..P WKT 2010 08 12 04 44 55 31.3200 -97.3300 251.000 122.0 133.040 3.330 -999.990 -999.990 1.330 ..P WKT 2010 08 12 04 49 55 31.3200 -97.3300 251.000 457.0 132.513 3.200 -999.990 -999.990 1.325 ..P WKT 2010 08 12 05 04 55 31.3200 -97.3300 251.000 30.0 118.126 3.630 -999.990 -999.990 1.181 ..P WKT 2010 08 12 05 09 55 31.3200 -97.3300 251.000 122.0 124.409 3.240 -999.990 -999.990 1.244 ..P WKT 2010 08 12 05 14 55 31.3200 -97.3300 251.000 457.0 134.134 5.830 -999.990 -999.990 1.341 ..P WKT 2010 08 12 05 19 55 31.3200 -97.3300 251.000 30.0 112.885 3.740 -999.990 -999.990 1.129 ..P WKT 2010 08 12 05 24 55 31.3200 -97.3300 251.000 122.0 122.473 4.910 -999.990 -999.990 1.225 ..P WKT 2010 08 12 05 29 55 31.3200 -97.3300 251.000 457.0 125.867 3.670 -999.990 -999.990 1.259 ..P WKT 2010 08 12 05 39 55 31.3200 -97.3300 251.000 30.0 114.490 3.530 -999.990 -999.990 1.145 ..P WKT 2010 08 12 05 44 55 31.3200 -97.3300 251.000 122.0 128.363 4.110 -999.990 -999.990 1.284 ..P WKT 2010 08 12 05 49 55 31.3200 -97.3300 251.000 457.0 134.800 3.930 -999.990 -999.990 1.348 ..P WKT 2010 08 12 05 54 55 31.3200 -97.3300 251.000 30.0 119.200 3.500 -999.990 -999.990 1.192 ..P WKT 2010 08 12 05 59 55 31.3200 -97.3300 251.000 122.0 129.357 4.100 -999.990 -999.990 1.294 ..P WKT 2010 08 12 06 04 55 31.3200 -97.3300 251.000 457.0 135.934 4.030 -999.990 -999.990 1.359 ..P WKT 2010 08 12 06 14 55 31.3200 -97.3300 251.000 30.0 114.585 3.570 -999.990 -999.990 1.146 ..P WKT 2010 08 12 06 19 55 31.3200 -97.3300 251.000 122.0 130.198 3.800 -999.990 -999.990 1.302 ..P WKT 2010 08 12 06 24 55 31.3200 -97.3300 251.000 457.0 126.657 3.350 -999.990 -999.990 1.267 ..P WKT 2010 08 12 06 29 55 31.3200 -97.3300 251.000 30.0 115.261 4.780 -999.990 -999.990 1.153 ..P WKT 2010 08 12 06 34 55 31.3200 -97.3300 251.000 122.0 130.326 3.990 -999.990 -999.990 1.303 ..P WKT 2010 08 12 06 39 55 31.3200 -97.3300 251.000 457.0 132.713 3.010 -999.990 -999.990 1.327 ..P WKT 2010 08 12 06 49 55 31.3200 -97.3300 251.000 30.0 118.915 3.170 -999.990 -999.990 1.189 ..P WKT 2010 08 12 06 54 55 31.3200 -97.3300 251.000 122.0 133.611 3.660 -999.990 -999.990 1.336 ..P WKT 2010 08 12 06 59 55 31.3200 -97.3300 251.000 457.0 137.003 4.090 -999.990 -999.990 1.370 ..P WKT 2010 08 12 07 04 55 31.3200 -97.3300 251.000 30.0 125.778 4.380 -999.990 -999.990 1.258 ..P WKT 2010 08 12 07 09 55 31.3200 -97.3300 251.000 122.0 129.997 3.950 -999.990 -999.990 1.300 ..P WKT 2010 08 12 07 14 55 31.3200 -97.3300 251.000 457.0 143.319 3.170 -999.990 -999.990 1.433 ..P WKT 2010 08 12 07 24 55 31.3200 -97.3300 251.000 30.0 133.634 2.960 -999.990 -999.990 1.336 ..P WKT 2010 08 12 07 29 55 31.3200 -97.3300 251.000 122.0 135.726 3.520 -999.990 -999.990 1.357 ..P WKT 2010 08 12 07 34 55 31.3200 -97.3300 251.000 457.0 136.992 3.850 -999.990 -999.990 1.370 ..P WKT 2010 08 12 07 39 55 31.3200 -97.3300 251.000 30.0 135.221 4.060 -999.990 -999.990 1.352 ..P WKT 2010 08 12 07 44 55 31.3200 -97.3300 251.000 122.0 140.627 3.430 -999.990 -999.990 1.406 ..P WKT 2010 08 12 07 49 55 31.3200 -97.3300 251.000 457.0 142.996 4.280 -999.990 -999.990 1.430 ..P WKT 2010 08 12 07 59 55 31.3200 -97.3300 251.000 30.0 142.079 3.430 -999.990 -999.990 1.421 ..P WKT 2010 08 12 08 04 55 31.3200 -97.3300 251.000 122.0 129.405 3.900 -999.990 -999.990 1.294 ..P WKT 2010 08 12 08 09 55 31.3200 -97.3300 251.000 457.0 138.814 4.130 -999.990 -999.990 1.388 ..P WKT 2010 08 12 08 14 55 31.3200 -97.3300 251.000 30.0 144.360 3.710 -999.990 -999.990 1.444 ..P WKT 2010 08 12 08 19 55 31.3200 -97.3300 251.000 122.0 168.957 4.190 -999.990 -999.990 1.690 ..P WKT 2010 08 12 08 24 55 31.3200 -97.3300 251.000 457.0 140.543 3.480 -999.990 -999.990 1.405 ..P WKT 2010 08 12 08 34 55 31.3200 -97.3300 251.000 30.0 170.575 4.010 -999.990 -999.990 1.706 ..P WKT 2010 08 12 08 39 55 31.3200 -97.3300 251.000 122.0 142.174 3.780 -999.990 -999.990 1.422 ..P WKT 2010 08 12 08 44 55 31.3200 -97.3300 251.000 457.0 213.480 4.290 -999.990 -999.990 2.135 ..P WKT 2010 08 12 08 49 55 31.3200 -97.3300 251.000 30.0 153.311 3.760 -999.990 -999.990 1.533 ..P WKT 2010 08 12 08 54 55 31.3200 -97.3300 251.000 122.0 175.732 4.100 -999.990 -999.990 1.757 ..P WKT 2010 08 12 08 59 55 31.3200 -97.3300 251.000 457.0 134.476 2.960 -999.990 -999.990 1.345 ..P WKT 2010 08 12 09 09 55 31.3200 -97.3300 251.000 30.0 146.602 3.520 -999.990 -999.990 1.466 ..P WKT 2010 08 12 09 14 55 31.3200 -97.3300 251.000 122.0 144.732 3.570 -999.990 -999.990 1.447 ..P WKT 2010 08 12 09 19 55 31.3200 -97.3300 251.000 457.0 137.472 4.280 -999.990 -999.990 1.375 ..P WKT 2010 08 12 09 24 55 31.3200 -97.3300 251.000 30.0 154.671 5.280 -999.990 -999.990 1.547 ..P WKT 2010 08 12 09 29 55 31.3200 -97.3300 251.000 122.0 152.663 3.980 -999.990 -999.990 1.527 ..P WKT 2010 08 12 09 34 55 31.3200 -97.3300 251.000 457.0 136.281 4.220 -999.990 -999.990 1.363 ..P WKT 2010 08 12 09 44 55 31.3200 -97.3300 251.000 30.0 152.363 3.800 -999.990 -999.990 1.524 ..P WKT 2010 08 12 09 49 55 31.3200 -97.3300 251.000 122.0 142.672 4.320 -999.990 -999.990 1.427 ..P WKT 2010 08 12 09 54 55 31.3200 -97.3300 251.000 457.0 136.434 5.170 -999.990 -999.990 1.364 ..P WKT 2010 08 12 09 59 55 31.3200 -97.3300 251.000 30.0 160.062 5.220 -999.990 -999.990 1.601 ..P WKT 2010 08 12 10 04 55 31.3200 -97.3300 251.000 122.0 161.016 4.560 -999.990 -999.990 1.610 ..P WKT 2010 08 12 10 09 55 31.3200 -97.3300 251.000 457.0 139.430 4.060 -999.990 -999.990 1.394 ..P WKT 2010 08 12 10 19 55 31.3200 -97.3300 251.000 30.0 167.831 4.340 -999.990 -999.990 1.678 ..P WKT 2010 08 12 10 24 55 31.3200 -97.3300 251.000 122.0 173.706 4.700 -999.990 -999.990 1.737 ..P WKT 2010 08 12 10 29 55 31.3200 -97.3300 251.000 457.0 140.297 5.090 -999.990 -999.990 1.403 ..P WKT 2010 08 12 10 34 55 31.3200 -97.3300 251.000 30.0 161.942 5.580 -999.990 -999.990 1.619 ..P WKT 2010 08 12 10 39 55 31.3200 -97.3300 251.000 122.0 148.725 4.920 -999.990 -999.990 1.487 ..P WKT 2010 08 12 10 44 55 31.3200 -97.3300 251.000 457.0 134.123 3.810 -999.990 -999.990 1.341 ..P WKT 2010 08 12 10 54 55 31.3200 -97.3300 251.000 30.0 149.531 3.860 -999.990 -999.990 1.495 ..P WKT 2010 08 12 10 59 55 31.3200 -97.3300 251.000 122.0 146.886 5.160 -999.990 -999.990 1.469 ..P WKT 2010 08 12 11 04 55 31.3200 -97.3300 251.000 457.0 133.724 5.550 -999.990 -999.990 1.337 ..P WKT 2010 08 12 11 09 55 31.3200 -97.3300 251.000 30.0 164.851 4.800 -999.990 -999.990 1.649 ..P WKT 2010 08 12 11 14 55 31.3200 -97.3300 251.000 122.0 154.179 3.610 -999.990 -999.990 1.542 ..P WKT 2010 08 12 11 19 55 31.3200 -97.3300 251.000 457.0 136.306 3.780 -999.990 -999.990 1.363 ..P WKT 2010 08 12 11 29 55 31.3200 -97.3300 251.000 30.0 164.055 3.400 -999.990 -999.990 1.641 ..P WKT 2010 08 12 11 34 55 31.3200 -97.3300 251.000 122.0 150.145 3.430 -999.990 -999.990 1.501 ..P WKT 2010 08 12 11 39 55 31.3200 -97.3300 251.000 457.0 137.894 3.920 -999.990 -999.990 1.379 ..P WKT 2010 08 12 11 44 55 31.3200 -97.3300 251.000 30.0 164.419 5.200 -999.990 -999.990 1.644 ..P WKT 2010 08 12 11 49 55 31.3200 -97.3300 251.000 122.0 146.074 3.800 -999.990 -999.990 1.461 ..P WKT 2010 08 12 12 09 55 31.3200 -97.3300 251.000 457.0 129.940 3.630 -999.990 -999.990 1.299 ..P WKT 2010 08 12 12 10 25 31.3200 -97.3300 251.000 457.0 131.556 3.880 -999.990 -999.990 1.316 ..P WKT 2010 08 12 12 10 55 31.3200 -97.3300 251.000 457.0 131.787 3.610 -999.990 -999.990 1.318 ..P WKT 2010 08 12 12 11 25 31.3200 -97.3300 251.000 457.0 135.066 3.800 -999.990 -999.990 1.351 ..P WKT 2010 08 12 12 11 55 31.3200 -97.3300 251.000 457.0 132.248 4.160 -999.990 -999.990 1.322 ..P WKT 2010 08 12 12 12 25 31.3200 -97.3300 251.000 457.0 132.202 3.870 -999.990 -999.990 1.322 ..P WKT 2010 08 12 12 12 55 31.3200 -97.3300 251.000 457.0 140.469 4.180 -999.990 -999.990 1.405 ..P WKT 2010 08 12 12 13 25 31.3200 -97.3300 251.000 457.0 134.603 4.050 -999.990 -999.990 1.346 ..P WKT 2010 08 12 12 13 55 31.3200 -97.3300 251.000 457.0 137.604 3.760 -999.990 -999.990 1.376 ..P WKT 2010 08 12 12 14 25 31.3200 -97.3300 251.000 457.0 137.142 3.720 -999.990 -999.990 1.371 ..P WKT 2010 08 12 12 14 55 31.3200 -97.3300 251.000 457.0 133.909 3.900 -999.990 -999.990 1.339 ..P WKT 2010 08 12 12 19 55 31.3200 -97.3300 251.000 30.0 156.866 4.170 -999.990 -999.990 1.569 ..P WKT 2010 08 12 12 24 55 31.3200 -97.3300 251.000 122.0 139.217 5.550 -999.990 -999.990 1.392 ..P WKT 2010 08 12 12 29 55 31.3200 -97.3300 251.000 457.0 137.644 4.410 -999.990 -999.990 1.376 ..P WKT 2010 08 12 12 34 55 31.3200 -97.3300 251.000 30.0 157.005 3.700 -999.990 -999.990 1.570 ..P WKT 2010 08 12 12 39 55 31.3200 -97.3300 251.000 122.0 138.655 3.900 -999.990 -999.990 1.387 ..P WKT 2010 08 12 12 44 55 31.3200 -97.3300 251.000 457.0 136.250 3.920 -999.990 -999.990 1.363 ..P WKT 2010 08 12 12 54 55 31.3200 -97.3300 251.000 30.0 149.962 3.360 -999.990 -999.990 1.500 ..P WKT 2010 08 12 12 59 55 31.3200 -97.3300 251.000 122.0 139.032 3.310 -999.990 -999.990 1.390 ..P WKT 2010 08 12 13 04 55 31.3200 -97.3300 251.000 457.0 137.812 3.300 -999.990 -999.990 1.378 ..P WKT 2010 08 12 13 09 55 31.3200 -97.3300 251.000 30.0 157.269 3.140 -999.990 -999.990 1.573 ..P WKT 2010 08 12 13 14 55 31.3200 -97.3300 251.000 122.0 139.951 3.030 -999.990 -999.990 1.400 ..P WKT 2010 08 12 13 19 55 31.3200 -97.3300 251.000 457.0 136.371 2.880 -999.990 -999.990 1.364 ..P WKT 2010 08 12 13 29 55 31.3200 -97.3300 251.000 30.0 152.970 4.030 -999.990 -999.990 1.530 ..P WKT 2010 08 12 13 34 55 31.3200 -97.3300 251.000 122.0 147.466 3.170 -999.990 -999.990 1.475 ..P WKT 2010 08 12 13 39 55 31.3200 -97.3300 251.000 457.0 136.960 3.620 -999.990 -999.990 1.370 ..P WKT 2010 08 12 13 44 55 31.3200 -97.3300 251.000 30.0 147.426 4.500 -999.990 -999.990 1.474 ..P WKT 2010 08 12 13 49 55 31.3200 -97.3300 251.000 122.0 149.004 3.930 -999.990 -999.990 1.490 ..P WKT 2010 08 12 13 54 55 31.3200 -97.3300 251.000 457.0 140.717 5.570 -999.990 -999.990 1.407 ..P WKT 2010 08 12 14 04 55 31.3200 -97.3300 251.000 30.0 148.935 4.830 -999.990 -999.990 1.489 ..P WKT 2010 08 12 14 09 55 31.3200 -97.3300 251.000 122.0 158.635 5.050 -999.990 -999.990 1.586 ..P WKT 2010 08 12 14 14 55 31.3200 -97.3300 251.000 457.0 143.315 3.900 -999.990 -999.990 1.433 ..P WKT 2010 08 12 14 19 55 31.3200 -97.3300 251.000 30.0 153.851 3.830 -999.990 -999.990 1.539 ..P WKT 2010 08 12 14 24 55 31.3200 -97.3300 251.000 122.0 152.432 6.380 -999.990 -999.990 1.524 ..P WKT 2010 08 12 14 29 55 31.3200 -97.3300 251.000 457.0 140.721 3.680 -999.990 -999.990 1.407 ..P WKT 2010 08 12 14 39 55 31.3200 -97.3300 251.000 30.0 142.627 4.460 -999.990 -999.990 1.426 ..P WKT 2010 08 12 14 44 55 31.3200 -97.3300 251.000 122.0 160.146 4.050 -999.990 -999.990 1.601 ..P WKT 2010 08 12 14 49 55 31.3200 -97.3300 251.000 457.0 143.162 3.880 -999.990 -999.990 1.432 ..P WKT 2010 08 12 14 54 55 31.3200 -97.3300 251.000 30.0 144.543 4.590 -999.990 -999.990 1.445 ..P WKT 2010 08 12 14 59 55 31.3200 -97.3300 251.000 122.0 150.935 4.530 -999.990 -999.990 1.509 ..P WKT 2010 08 12 15 04 55 31.3200 -97.3300 251.000 457.0 137.284 4.450 -999.990 -999.990 1.373 ..P WKT 2010 08 12 15 14 55 31.3200 -97.3300 251.000 30.0 149.833 4.480 -999.990 -999.990 1.498 ..P WKT 2010 08 12 15 19 55 31.3200 -97.3300 251.000 122.0 155.155 3.670 -999.990 -999.990 1.552 ..P WKT 2010 08 12 15 24 55 31.3200 -97.3300 251.000 457.0 137.357 4.410 -999.990 -999.990 1.374 ..P WKT 2010 08 12 15 29 55 31.3200 -97.3300 251.000 30.0 142.958 3.820 -999.990 -999.990 1.430 ..P WKT 2010 08 12 15 34 55 31.3200 -97.3300 251.000 122.0 150.511 3.580 -999.990 -999.990 1.505 ..P WKT 2010 08 12 15 39 55 31.3200 -97.3300 251.000 457.0 138.000 3.250 -999.990 -999.990 1.380 ..P WKT 2010 08 12 15 49 55 31.3200 -97.3300 251.000 30.0 140.527 3.750 -999.990 -999.990 1.405 ..P WKT 2010 08 12 15 54 55 31.3200 -97.3300 251.000 122.0 145.534 3.640 -999.990 -999.990 1.455 ..P WKT 2010 08 12 15 59 55 31.3200 -97.3300 251.000 457.0 134.649 4.060 -999.990 -999.990 1.346 ..P WKT 2010 08 12 16 04 55 31.3200 -97.3300 251.000 30.0 131.570 5.130 -999.990 -999.990 1.316 ..P WKT 2010 08 12 16 09 55 31.3200 -97.3300 251.000 122.0 141.878 4.490 -999.990 -999.990 1.419 ..P WKT 2010 08 12 16 14 55 31.3200 -97.3300 251.000 457.0 148.840 4.530 -999.990 -999.990 1.488 ..P WKT 2010 08 12 16 24 55 31.3200 -97.3300 251.000 30.0 140.212 4.700 -999.990 -999.990 1.402 ..P WKT 2010 08 12 16 29 55 31.3200 -97.3300 251.000 122.0 153.217 5.110 -999.990 -999.990 1.532 ..P WKT 2010 08 12 16 34 55 31.3200 -97.3300 251.000 457.0 152.968 4.340 -999.990 -999.990 1.530 ..P WKT 2010 08 12 16 39 55 31.3200 -97.3300 251.000 30.0 146.300 4.640 -999.990 -999.990 1.463 ..P WKT 2010 08 12 16 44 55 31.3200 -97.3300 251.000 122.0 160.566 4.830 -999.990 -999.990 1.606 ..P WKT 2010 08 12 16 49 55 31.3200 -97.3300 251.000 457.0 150.687 4.160 -999.990 -999.990 1.507 ..P WKT 2010 08 12 17 04 55 31.3200 -97.3300 251.000 30.0 143.690 4.220 -999.990 -999.990 1.437 ..P WKT 2010 08 12 17 09 55 31.3200 -97.3300 251.000 122.0 160.079 4.390 -999.990 -999.990 1.601 ..P WKT 2010 08 12 17 14 55 31.3200 -97.3300 251.000 457.0 151.327 4.300 -999.990 -999.990 1.513 ..P WKT 2010 08 12 17 19 55 31.3200 -97.3300 251.000 30.0 144.808 4.370 -999.990 -999.990 1.448 ..P WKT 2010 08 12 17 24 55 31.3200 -97.3300 251.000 122.0 163.719 4.070 -999.990 -999.990 1.637 ..P WKT 2010 08 12 17 29 55 31.3200 -97.3300 251.000 457.0 152.729 3.460 -999.990 -999.990 1.527 ..P WKT 2010 08 12 17 39 55 31.3200 -97.3300 251.000 30.0 148.134 3.540 -999.990 -999.990 1.481 ..P WKT 2010 08 12 17 44 55 31.3200 -97.3300 251.000 122.0 155.095 4.050 -999.990 -999.990 1.551 ..P WKT 2010 08 12 17 49 55 31.3200 -97.3300 251.000 457.0 157.443 4.970 -999.990 -999.990 1.574 ..P WKT 2010 08 12 17 54 55 31.3200 -97.3300 251.000 30.0 151.961 5.750 -999.990 -999.990 1.520 ..P WKT 2010 08 12 17 59 55 31.3200 -97.3300 251.000 122.0 165.918 4.640 -999.990 -999.990 1.659 ..P WKT 2010 08 12 18 04 55 31.3200 -97.3300 251.000 457.0 165.051 3.920 -999.990 -999.990 1.651 ..P WKT 2010 08 12 18 14 55 31.3200 -97.3300 251.000 30.0 159.759 4.170 -999.990 -999.990 1.598 ..P WKT 2010 08 12 18 19 55 31.3200 -97.3300 251.000 122.0 169.046 5.640 -999.990 -999.990 1.690 ..P WKT 2010 08 12 18 24 55 31.3200 -97.3300 251.000 457.0 150.905 5.970 -999.990 -999.990 1.509 ..P WKT 2010 08 12 18 29 55 31.3200 -97.3300 251.000 30.0 155.435 5.570 -999.990 -999.990 1.554 ..P WKT 2010 08 12 18 34 55 31.3200 -97.3300 251.000 122.0 159.406 4.160 -999.990 -999.990 1.594 ..P WKT 2010 08 12 18 39 55 31.3200 -97.3300 251.000 457.0 149.656 4.270 -999.990 -999.990 1.497 ..P WKT 2010 08 12 18 49 55 31.3200 -97.3300 251.000 30.0 142.974 4.030 -999.990 -999.990 1.430 ..P WKT 2010 08 12 18 54 55 31.3200 -97.3300 251.000 122.0 160.052 4.370 -999.990 -999.990 1.601 ..P WKT 2010 08 12 18 59 55 31.3200 -97.3300 251.000 457.0 143.233 4.430 -999.990 -999.990 1.432 ..P WKT 2010 08 12 19 04 55 31.3200 -97.3300 251.000 30.0 148.827 5.060 -999.990 -999.990 1.488 ..P WKT 2010 08 12 19 09 55 31.3200 -97.3300 251.000 122.0 158.626 4.920 -999.990 -999.990 1.586 ..P WKT 2010 08 12 19 14 55 31.3200 -97.3300 251.000 457.0 147.686 5.350 -999.990 -999.990 1.477 ..P WKT 2010 08 12 19 24 55 31.3200 -97.3300 251.000 30.0 150.750 5.990 -999.990 -999.990 1.508 ..P WKT 2010 08 12 19 29 55 31.3200 -97.3300 251.000 122.0 165.042 4.620 -999.990 -999.990 1.650 ..P WKT 2010 08 12 19 34 55 31.3200 -97.3300 251.000 457.0 152.414 4.130 -999.990 -999.990 1.524 ..P WKT 2010 08 12 19 39 55 31.3200 -97.3300 251.000 30.0 147.917 3.750 -999.990 -999.990 1.479 ..P WKT 2010 08 12 19 44 55 31.3200 -97.3300 251.000 122.0 161.372 4.500 -999.990 -999.990 1.614 ..P WKT 2010 08 12 19 49 55 31.3200 -97.3300 251.000 457.0 156.875 3.330 -999.990 -999.990 1.569 ..P WKT 2010 08 12 19 59 55 31.3200 -97.3300 251.000 30.0 154.372 3.170 -999.990 -999.990 1.544 ..P WKT 2010 08 12 20 04 55 31.3200 -97.3300 251.000 122.0 167.033 3.550 -999.990 -999.990 1.670 ..P WKT 2010 08 12 20 09 55 31.3200 -97.3300 251.000 457.0 155.136 3.290 -999.990 -999.990 1.551 ..P WKT 2010 08 12 20 14 55 31.3200 -97.3300 251.000 30.0 152.219 3.660 -999.990 -999.990 1.522 ..P WKT 2010 08 12 20 19 55 31.3200 -97.3300 251.000 122.0 165.166 2.880 -999.990 -999.990 1.652 ..P WKT 2010 08 12 20 24 55 31.3200 -97.3300 251.000 457.0 153.263 3.370 -999.990 -999.990 1.533 ..P WKT 2010 08 12 20 34 55 31.3200 -97.3300 251.000 30.0 156.074 2.750 -999.990 -999.990 1.561 ..P WKT 2010 08 12 20 39 55 31.3200 -97.3300 251.000 122.0 162.928 3.260 -999.990 -999.990 1.629 ..P WKT 2010 08 12 20 44 55 31.3200 -97.3300 251.000 457.0 156.297 3.240 -999.990 -999.990 1.563 ..P WKT 2010 08 12 20 49 55 31.3200 -97.3300 251.000 30.0 152.896 4.600 -999.990 -999.990 1.529 ..P WKT 2010 08 12 20 54 55 31.3200 -97.3300 251.000 122.0 169.449 3.440 -999.990 -999.990 1.694 ..P WKT 2010 08 12 20 59 55 31.3200 -97.3300 251.000 457.0 165.627 3.670 -999.990 -999.990 1.656 ..P WKT 2010 08 12 21 09 55 31.3200 -97.3300 251.000 30.0 152.979 3.520 -999.990 -999.990 1.530 ..P WKT 2010 08 12 21 14 55 31.3200 -97.3300 251.000 122.0 170.867 3.190 -999.990 -999.990 1.709 ..P WKT 2010 08 12 21 19 55 31.3200 -97.3300 251.000 457.0 153.041 4.100 -999.990 -999.990 1.530 ..P WKT 2010 08 12 21 24 55 31.3200 -97.3300 251.000 30.0 154.057 4.650 -999.990 -999.990 1.541 ..P WKT 2010 08 12 21 29 55 31.3200 -97.3300 251.000 122.0 173.780 3.010 -999.990 -999.990 1.738 ..P WKT 2010 08 12 21 34 55 31.3200 -97.3300 251.000 457.0 154.260 2.320 -999.990 -999.990 1.543 ..P WKT 2010 08 12 21 44 55 31.3200 -97.3300 251.000 30.0 156.634 2.460 -999.990 -999.990 1.566 ..P WKT 2010 08 12 21 49 55 31.3200 -97.3300 251.000 122.0 166.577 4.370 -999.990 -999.990 1.666 ..P WKT 2010 08 12 21 54 55 31.3200 -97.3300 251.000 457.0 162.025 3.210 -999.990 -999.990 1.620 ..P WKT 2010 08 12 21 59 55 31.3200 -97.3300 251.000 30.0 150.011 2.850 -999.990 -999.990 1.500 ..P WKT 2010 08 12 22 04 55 31.3200 -97.3300 251.000 122.0 171.221 3.610 -999.990 -999.990 1.712 ..P WKT 2010 08 12 22 09 55 31.3200 -97.3300 251.000 457.0 149.770 2.700 -999.990 -999.990 1.498 ..P WKT 2010 08 12 22 19 55 31.3200 -97.3300 251.000 30.0 153.634 2.690 -999.990 -999.990 1.536 ..P WKT 2010 08 12 22 24 55 31.3200 -97.3300 251.000 122.0 166.987 2.670 -999.990 -999.990 1.670 ..P WKT 2010 08 12 22 29 55 31.3200 -97.3300 251.000 457.0 161.465 3.300 -999.990 -999.990 1.615 ..P WKT 2010 08 12 22 34 55 31.3200 -97.3300 251.000 30.0 159.605 3.000 -999.990 -999.990 1.596 ..P WKT 2010 08 12 22 39 55 31.3200 -97.3300 251.000 122.0 163.099 2.610 -999.990 -999.990 1.631 ..P WKT 2010 08 12 22 44 55 31.3200 -97.3300 251.000 457.0 167.722 4.140 -999.990 -999.990 1.677 ..P WKT 2010 08 12 22 54 55 31.3200 -97.3300 251.000 30.0 161.343 2.430 -999.990 -999.990 1.613 ..P WKT 2010 08 12 22 59 55 31.3200 -97.3300 251.000 122.0 172.334 4.640 -999.990 -999.990 1.723 ..P WKT 2010 08 12 23 04 55 31.3200 -97.3300 251.000 457.0 164.148 3.300 -999.990 -999.990 1.641 ..P WKT 2010 08 12 23 09 55 31.3200 -97.3300 251.000 30.0 154.831 3.200 -999.990 -999.990 1.548 ..P WKT 2010 08 12 23 14 55 31.3200 -97.3300 251.000 122.0 164.978 4.310 -999.990 -999.990 1.650 ..P WKT 2010 08 12 23 19 55 31.3200 -97.3300 251.000 457.0 159.327 4.960 -999.990 -999.990 1.593 ..P WKT 2010 08 12 23 29 55 31.3200 -97.3300 251.000 30.0 152.048 4.380 -999.990 -999.990 1.520 ..P WKT 2010 08 12 23 34 55 31.3200 -97.3300 251.000 122.0 161.147 4.200 -999.990 -999.990 1.611 ..P WKT 2010 08 12 23 39 55 31.3200 -97.3300 251.000 457.0 151.052 3.750 -999.990 -999.990 1.511 ..P WKT 2010 08 12 23 44 55 31.3200 -97.3300 251.000 30.0 153.094 4.250 -999.990 -999.990 1.531 ..P WKT 2010 08 12 23 49 55 31.3200 -97.3300 251.000 122.0 167.561 4.000 -999.990 -999.990 1.676 ..P WKT 2010 08 13 00 09 55 31.3200 -97.3300 251.000 457.0 162.671 3.210 -999.990 -999.990 1.627 ..P WKT 2010 08 13 00 10 25 31.3200 -97.3300 251.000 457.0 155.983 3.010 -999.990 -999.990 1.560 ..P WKT 2010 08 13 00 10 55 31.3200 -97.3300 251.000 457.0 151.979 3.420 -999.990 -999.990 1.520 ..P WKT 2010 08 13 00 11 25 31.3200 -97.3300 251.000 457.0 154.752 4.120 -999.990 -999.990 1.548 ..P WKT 2010 08 13 00 11 55 31.3200 -97.3300 251.000 457.0 153.855 3.100 -999.990 -999.990 1.539 ..P WKT 2010 08 13 00 12 25 31.3200 -97.3300 251.000 457.0 159.029 2.920 -999.990 -999.990 1.590 ..P WKT 2010 08 13 00 12 55 31.3200 -97.3300 251.000 457.0 155.166 3.850 -999.990 -999.990 1.552 ..P WKT 2010 08 13 00 13 25 31.3200 -97.3300 251.000 457.0 157.516 3.260 -999.990 -999.990 1.575 ..P WKT 2010 08 13 00 13 55 31.3200 -97.3300 251.000 457.0 156.618 3.190 -999.990 -999.990 1.566 ..P WKT 2010 08 13 00 14 25 31.3200 -97.3300 251.000 457.0 155.015 3.480 -999.990 -999.990 1.550 ..P WKT 2010 08 13 00 14 55 31.3200 -97.3300 251.000 457.0 158.635 3.780 -999.990 -999.990 1.586 ..P WKT 2010 08 13 00 19 55 31.3200 -97.3300 251.000 30.0 149.942 2.670 -999.990 -999.990 1.499 ..P WKT 2010 08 13 00 24 55 31.3200 -97.3300 251.000 122.0 163.839 5.210 -999.990 -999.990 1.638 ..P WKT 2010 08 13 00 29 55 31.3200 -97.3300 251.000 457.0 159.099 3.200 -999.990 -999.990 1.591 ..P WKT 2010 08 13 00 34 55 31.3200 -97.3300 251.000 30.0 153.513 3.410 -999.990 -999.990 1.535 ..P WKT 2010 08 13 00 39 55 31.3200 -97.3300 251.000 122.0 156.820 3.470 -999.990 -999.990 1.568 ..P WKT 2010 08 13 00 44 55 31.3200 -97.3300 251.000 457.0 156.174 4.100 -999.990 -999.990 1.562 ..P WKT 2010 08 13 00 54 55 31.3200 -97.3300 251.000 30.0 151.741 4.800 -999.990 -999.990 1.517 ..P WKT 2010 08 13 00 59 55 31.3200 -97.3300 251.000 122.0 160.794 3.900 -999.990 -999.990 1.608 ..P WKT 2010 08 13 01 04 55 31.3200 -97.3300 251.000 457.0 166.743 3.990 -999.990 -999.990 1.667 ..P WKT 2010 08 13 01 09 55 31.3200 -97.3300 251.000 30.0 159.286 4.860 -999.990 -999.990 1.593 ..P WKT 2010 08 13 01 14 55 31.3200 -97.3300 251.000 122.0 167.915 3.650 -999.990 -999.990 1.679 ..P WKT 2010 08 13 01 19 55 31.3200 -97.3300 251.000 457.0 167.654 3.800 -999.990 -999.990 1.677 ..P WKT 2010 08 13 01 29 55 31.3200 -97.3300 251.000 30.0 172.855 3.900 -999.990 -999.990 1.729 ..P WKT 2010 08 13 01 34 55 31.3200 -97.3300 251.000 122.0 175.072 6.010 -999.990 -999.990 1.751 ..P WKT 2010 08 13 01 39 55 31.3200 -97.3300 251.000 457.0 171.366 3.590 -999.990 -999.990 1.714 ..P WKT 2010 08 13 01 44 55 31.3200 -97.3300 251.000 30.0 171.609 3.300 -999.990 -999.990 1.716 ..P WKT 2010 08 13 01 49 55 31.3200 -97.3300 251.000 122.0 176.222 3.300 -999.990 -999.990 1.762 ..P WKT 2010 08 13 01 54 55 31.3200 -97.3300 251.000 457.0 163.635 2.960 -999.990 -999.990 1.636 ..P WKT 2010 08 13 02 04 55 31.3200 -97.3300 251.000 30.0 174.371 4.260 -999.990 -999.990 1.744 ..P WKT 2010 08 13 02 09 55 31.3200 -97.3300 251.000 122.0 183.877 2.910 -999.990 -999.990 1.839 ..P WKT 2010 08 13 02 14 55 31.3200 -97.3300 251.000 457.0 174.494 3.070 -999.990 -999.990 1.745 ..P WKT 2010 08 13 02 19 55 31.3200 -97.3300 251.000 30.0 177.796 3.940 -999.990 -999.990 1.778 ..P WKT 2010 08 13 02 24 55 31.3200 -97.3300 251.000 122.0 184.762 3.330 -999.990 -999.990 1.848 ..P WKT 2010 08 13 02 29 55 31.3200 -97.3300 251.000 457.0 174.254 3.420 -999.990 -999.990 1.743 ..P WKT 2010 08 13 02 39 55 31.3200 -97.3300 251.000 30.0 182.609 3.540 -999.990 -999.990 1.826 ..P WKT 2010 08 13 02 44 55 31.3200 -97.3300 251.000 122.0 187.379 4.080 -999.990 -999.990 1.874 ..P WKT 2010 08 13 02 49 55 31.3200 -97.3300 251.000 457.0 176.089 2.730 -999.990 -999.990 1.761 ..P WKT 2010 08 13 02 54 55 31.3200 -97.3300 251.000 30.0 184.521 2.990 -999.990 -999.990 1.845 ..P WKT 2010 08 13 02 59 55 31.3200 -97.3300 251.000 122.0 188.726 4.930 -999.990 -999.990 1.887 ..P WKT 2010 08 13 03 04 55 31.3200 -97.3300 251.000 457.0 176.030 2.920 -999.990 -999.990 1.760 ..P WKT 2010 08 13 03 14 55 31.3200 -97.3300 251.000 30.0 186.935 2.830 -999.990 -999.990 1.869 ..P WKT 2010 08 13 03 19 55 31.3200 -97.3300 251.000 122.0 189.690 3.230 -999.990 -999.990 1.897 ..P WKT 2010 08 13 03 24 55 31.3200 -97.3300 251.000 457.0 186.814 3.320 -999.990 -999.990 1.868 ..P WKT 2010 08 13 03 29 55 31.3200 -97.3300 251.000 30.0 181.967 2.670 -999.990 -999.990 1.820 ..P WKT 2010 08 13 03 34 55 31.3200 -97.3300 251.000 122.0 185.004 2.530 -999.990 -999.990 1.850 ..P WKT 2010 08 13 03 39 55 31.3200 -97.3300 251.000 457.0 172.837 2.650 -999.990 -999.990 1.728 ..P WKT 2010 08 13 03 49 55 31.3200 -97.3300 251.000 30.0 179.434 3.280 -999.990 -999.990 1.794 ..P WKT 2010 08 13 03 54 55 31.3200 -97.3300 251.000 122.0 181.304 2.720 -999.990 -999.990 1.813 ..P WKT 2010 08 13 03 59 55 31.3200 -97.3300 251.000 457.0 168.961 2.930 -999.990 -999.990 1.690 ..P WKT 2010 08 13 04 04 55 31.3200 -97.3300 251.000 30.0 164.922 3.670 -999.990 -999.990 1.649 ..P WKT 2010 08 13 04 09 55 31.3200 -97.3300 251.000 122.0 171.999 4.900 -999.990 -999.990 1.720 ..P WKT 2010 08 13 04 14 55 31.3200 -97.3300 251.000 457.0 166.835 3.100 -999.990 -999.990 1.668 ..P WKT 2010 08 13 04 24 55 31.3200 -97.3300 251.000 30.0 165.953 3.510 -999.990 -999.990 1.660 ..P WKT 2010 08 13 04 29 55 31.3200 -97.3300 251.000 122.0 168.406 4.670 -999.990 -999.990 1.684 ..P WKT 2010 08 13 04 34 55 31.3200 -97.3300 251.000 457.0 160.872 3.560 -999.990 -999.990 1.609 ..P WKT 2010 08 13 04 39 55 31.3200 -97.3300 251.000 30.0 157.559 3.340 -999.990 -999.990 1.576 ..P WKT 2010 08 13 04 44 55 31.3200 -97.3300 251.000 122.0 169.012 4.480 -999.990 -999.990 1.690 ..P WKT 2010 08 13 04 49 55 31.3200 -97.3300 251.000 457.0 161.761 5.380 -999.990 -999.990 1.618 ..P WKT 2010 08 13 05 04 55 31.3200 -97.3300 251.000 30.0 159.994 3.770 -999.990 -999.990 1.600 ..P WKT 2010 08 13 05 09 55 31.3200 -97.3300 251.000 122.0 161.891 4.290 -999.990 -999.990 1.619 ..P WKT 2010 08 13 05 14 55 31.3200 -97.3300 251.000 457.0 145.656 6.070 -999.990 -999.990 1.457 ..P WKT 2010 08 13 05 19 55 31.3200 -97.3300 251.000 30.0 157.532 5.960 -999.990 -999.990 1.575 ..P WKT 2010 08 13 05 24 55 31.3200 -97.3300 251.000 122.0 159.289 4.890 -999.990 -999.990 1.593 ..P WKT 2010 08 13 05 29 55 31.3200 -97.3300 251.000 457.0 144.040 3.720 -999.990 -999.990 1.440 ..P WKT 2010 08 13 05 39 55 31.3200 -97.3300 251.000 30.0 155.676 3.610 -999.990 -999.990 1.557 ..P WKT 2010 08 13 05 44 55 31.3200 -97.3300 251.000 122.0 153.892 5.110 -999.990 -999.990 1.539 ..P WKT 2010 08 13 05 49 55 31.3200 -97.3300 251.000 457.0 147.893 6.070 -999.990 -999.990 1.479 ..P WKT 2010 08 13 05 54 55 31.3200 -97.3300 251.000 30.0 156.505 4.680 -999.990 -999.990 1.565 ..P WKT 2010 08 13 05 59 55 31.3200 -97.3300 251.000 122.0 158.795 5.110 -999.990 -999.990 1.588 ..P WKT 2010 08 13 06 04 55 31.3200 -97.3300 251.000 457.0 157.854 3.810 -999.990 -999.990 1.579 ..P WKT 2010 08 13 06 14 55 31.3200 -97.3300 251.000 30.0 153.946 3.040 -999.990 -999.990 1.539 ..P WKT 2010 08 13 06 19 55 31.3200 -97.3300 251.000 122.0 156.175 4.500 -999.990 -999.990 1.562 ..P WKT 2010 08 13 06 24 55 31.3200 -97.3300 251.000 457.0 146.890 4.670 -999.990 -999.990 1.469 ..P WKT 2010 08 13 06 29 55 31.3200 -97.3300 251.000 30.0 152.208 3.890 -999.990 -999.990 1.522 ..P WKT 2010 08 13 06 34 55 31.3200 -97.3300 251.000 122.0 153.876 2.780 -999.990 -999.990 1.539 ..P WKT 2010 08 13 06 39 55 31.3200 -97.3300 251.000 457.0 144.031 2.430 -999.990 -999.990 1.440 ..P WKT 2010 08 13 06 49 55 31.3200 -97.3300 251.000 30.0 151.176 3.120 -999.990 -999.990 1.512 ..P WKT 2010 08 13 06 54 55 31.3200 -97.3300 251.000 122.0 153.002 2.770 -999.990 -999.990 1.530 ..P WKT 2010 08 13 06 59 55 31.3200 -97.3300 251.000 457.0 130.691 2.650 -999.990 -999.990 1.307 ..P WKT 2010 08 13 07 04 55 31.3200 -97.3300 251.000 30.0 151.884 5.910 -999.990 -999.990 1.519 ..P WKT 2010 08 13 07 09 55 31.3200 -97.3300 251.000 122.0 143.609 3.160 -999.990 -999.990 1.436 ..P WKT 2010 08 13 07 14 55 31.3200 -97.3300 251.000 457.0 127.477 3.360 -999.990 -999.990 1.275 ..P WKT 2010 08 13 07 24 55 31.3200 -97.3300 251.000 30.0 146.323 3.740 -999.990 -999.990 1.463 ..P WKT 2010 08 13 07 29 55 31.3200 -97.3300 251.000 122.0 151.557 3.290 -999.990 -999.990 1.516 ..P WKT 2010 08 13 07 34 55 31.3200 -97.3300 251.000 457.0 127.053 3.040 -999.990 -999.990 1.271 ..P WKT 2010 08 13 07 39 55 31.3200 -97.3300 251.000 30.0 147.995 4.620 -999.990 -999.990 1.480 ..P WKT 2010 08 13 07 44 55 31.3200 -97.3300 251.000 122.0 150.982 2.580 -999.990 -999.990 1.510 ..P WKT 2010 08 13 07 49 55 31.3200 -97.3300 251.000 457.0 134.338 3.500 -999.990 -999.990 1.343 ..P WKT 2010 08 13 07 59 55 31.3200 -97.3300 251.000 30.0 140.875 2.640 -999.990 -999.990 1.409 ..P WKT 2010 08 13 08 04 55 31.3200 -97.3300 251.000 122.0 150.452 3.350 -999.990 -999.990 1.505 ..P WKT 2010 08 13 08 09 55 31.3200 -97.3300 251.000 457.0 133.953 3.210 -999.990 -999.990 1.340 ..P WKT 2010 08 13 08 14 55 31.3200 -97.3300 251.000 30.0 141.846 3.180 -999.990 -999.990 1.418 ..P WKT 2010 08 13 08 19 55 31.3200 -97.3300 251.000 122.0 158.009 2.940 -999.990 -999.990 1.580 ..P WKT 2010 08 13 08 24 55 31.3200 -97.3300 251.000 457.0 130.300 2.910 -999.990 -999.990 1.303 ..P WKT 2010 08 13 08 34 55 31.3200 -97.3300 251.000 30.0 150.167 3.710 -999.990 -999.990 1.502 ..P WKT 2010 08 13 08 39 55 31.3200 -97.3300 251.000 122.0 158.777 3.430 -999.990 -999.990 1.588 ..P WKT 2010 08 13 08 44 55 31.3200 -97.3300 251.000 457.0 133.900 3.520 -999.990 -999.990 1.339 ..P WKT 2010 08 13 08 49 55 31.3200 -97.3300 251.000 30.0 145.031 3.610 -999.990 -999.990 1.450 ..P WKT 2010 08 13 08 54 55 31.3200 -97.3300 251.000 122.0 152.239 3.850 -999.990 -999.990 1.522 ..P WKT 2010 08 13 08 59 55 31.3200 -97.3300 251.000 457.0 134.651 3.410 -999.990 -999.990 1.347 ..P WKT 2010 08 13 09 09 55 31.3200 -97.3300 251.000 30.0 143.183 2.910 -999.990 -999.990 1.432 ..P WKT 2010 08 13 09 14 55 31.3200 -97.3300 251.000 122.0 139.044 3.220 -999.990 -999.990 1.390 ..P WKT 2010 08 13 09 19 55 31.3200 -97.3300 251.000 457.0 131.686 4.050 -999.990 -999.990 1.317 ..P WKT 2010 08 13 09 24 55 31.3200 -97.3300 251.000 30.0 142.112 3.060 -999.990 -999.990 1.421 ..P WKT 2010 08 13 09 29 55 31.3200 -97.3300 251.000 122.0 146.655 3.520 -999.990 -999.990 1.467 ..P WKT 2010 08 13 09 34 55 31.3200 -97.3300 251.000 457.0 134.677 3.850 -999.990 -999.990 1.347 ..P WKT 2010 08 13 09 44 55 31.3200 -97.3300 251.000 30.0 143.344 3.650 -999.990 -999.990 1.433 ..P WKT 2010 08 13 09 49 55 31.3200 -97.3300 251.000 122.0 136.548 2.900 -999.990 -999.990 1.365 ..P WKT 2010 08 13 09 54 55 31.3200 -97.3300 251.000 457.0 129.613 3.400 -999.990 -999.990 1.296 ..P WKT 2010 08 13 09 59 55 31.3200 -97.3300 251.000 30.0 140.314 3.730 -999.990 -999.990 1.403 ..P WKT 2010 08 13 10 04 55 31.3200 -97.3300 251.000 122.0 131.142 3.420 -999.990 -999.990 1.311 ..P WKT 2010 08 13 10 09 55 31.3200 -97.3300 251.000 457.0 125.888 3.000 -999.990 -999.990 1.259 ..P WKT 2010 08 13 10 19 55 31.3200 -97.3300 251.000 30.0 135.211 3.050 -999.990 -999.990 1.352 ..P WKT 2010 08 13 10 24 55 31.3200 -97.3300 251.000 122.0 143.908 3.330 -999.990 -999.990 1.439 ..P WKT 2010 08 13 10 29 55 31.3200 -97.3300 251.000 457.0 129.103 3.780 -999.990 -999.990 1.291 ..P WKT 2010 08 13 10 34 55 31.3200 -97.3300 251.000 30.0 137.799 4.670 -999.990 -999.990 1.378 ..P WKT 2010 08 13 10 39 55 31.3200 -97.3300 251.000 122.0 145.096 3.970 -999.990 -999.990 1.451 ..P WKT 2010 08 13 10 44 55 31.3200 -97.3300 251.000 457.0 131.693 3.170 -999.990 -999.990 1.317 ..P WKT 2010 08 13 10 54 55 31.3200 -97.3300 251.000 30.0 144.366 3.050 -999.990 -999.990 1.444 ..P WKT 2010 08 13 10 59 55 31.3200 -97.3300 251.000 122.0 132.963 4.060 -999.990 -999.990 1.330 ..P WKT 2010 08 13 11 04 55 31.3200 -97.3300 251.000 457.0 126.596 4.850 -999.990 -999.990 1.266 ..P WKT 2010 08 13 11 09 55 31.3200 -97.3300 251.000 30.0 140.082 3.850 -999.990 -999.990 1.401 ..P WKT 2010 08 13 11 14 55 31.3200 -97.3300 251.000 122.0 130.080 3.750 -999.990 -999.990 1.301 ..P WKT 2010 08 13 11 19 55 31.3200 -97.3300 251.000 457.0 125.950 2.810 -999.990 -999.990 1.260 ..P WKT 2010 08 13 11 29 55 31.3200 -97.3300 251.000 30.0 139.730 4.050 -999.990 -999.990 1.397 ..P WKT 2010 08 13 11 34 55 31.3200 -97.3300 251.000 122.0 134.718 3.350 -999.990 -999.990 1.347 ..P WKT 2010 08 13 11 39 55 31.3200 -97.3300 251.000 457.0 125.514 4.140 -999.990 -999.990 1.255 ..P WKT 2010 08 13 11 44 55 31.3200 -97.3300 251.000 30.0 148.729 4.090 -999.990 -999.990 1.487 ..P WKT 2010 08 13 11 49 55 31.3200 -97.3300 251.000 122.0 132.539 3.350 -999.990 -999.990 1.325 ..P WKT 2010 08 13 12 09 55 31.3200 -97.3300 251.000 457.0 128.237 3.710 -999.990 -999.990 1.282 ..P WKT 2010 08 13 12 10 25 31.3200 -97.3300 251.000 457.0 133.008 4.100 -999.990 -999.990 1.330 ..P WKT 2010 08 13 12 10 55 31.3200 -97.3300 251.000 457.0 128.003 4.770 -999.990 -999.990 1.280 ..P WKT 2010 08 13 12 11 25 31.3200 -97.3300 251.000 457.0 123.137 3.340 -999.990 -999.990 1.231 ..P WKT 2010 08 13 12 11 55 31.3200 -97.3300 251.000 457.0 131.540 5.330 -999.990 -999.990 1.315 ..P WKT 2010 08 13 12 12 25 31.3200 -97.3300 251.000 457.0 131.842 3.730 -999.990 -999.990 1.318 ..P WKT 2010 08 13 12 12 55 31.3200 -97.3300 251.000 457.0 133.261 3.540 -999.990 -999.990 1.333 ..P WKT 2010 08 13 12 13 25 31.3200 -97.3300 251.000 457.0 134.262 3.410 -999.990 -999.990 1.343 ..P WKT 2010 08 13 12 13 55 31.3200 -97.3300 251.000 457.0 130.514 3.360 -999.990 -999.990 1.305 ..P WKT 2010 08 13 12 14 25 31.3200 -97.3300 251.000 457.0 130.396 3.860 -999.990 -999.990 1.304 ..P WKT 2010 08 13 12 14 55 31.3200 -97.3300 251.000 457.0 133.911 4.370 -999.990 -999.990 1.339 ..P WKT 2010 08 13 12 19 55 31.3200 -97.3300 251.000 30.0 138.886 3.090 -999.990 -999.990 1.389 ..P WKT 2010 08 13 12 24 55 31.3200 -97.3300 251.000 122.0 134.225 3.680 -999.990 -999.990 1.342 ..P WKT 2010 08 13 12 29 55 31.3200 -97.3300 251.000 457.0 137.105 4.290 -999.990 -999.990 1.371 ..P WKT 2010 08 13 12 34 55 31.3200 -97.3300 251.000 30.0 142.635 5.130 -999.990 -999.990 1.426 ..P WKT 2010 08 13 12 39 55 31.3200 -97.3300 251.000 122.0 142.304 3.790 -999.990 -999.990 1.423 ..P WKT 2010 08 13 12 44 55 31.3200 -97.3300 251.000 457.0 127.458 2.930 -999.990 -999.990 1.275 ..P WKT 2010 08 13 12 54 55 31.3200 -97.3300 251.000 30.0 141.254 5.740 -999.990 -999.990 1.413 ..P WKT 2010 08 13 12 59 55 31.3200 -97.3300 251.000 122.0 134.452 4.360 -999.990 -999.990 1.345 ..P WKT 2010 08 13 13 04 55 31.3200 -97.3300 251.000 457.0 121.933 4.630 -999.990 -999.990 1.219 ..P WKT 2010 08 13 13 09 55 31.3200 -97.3300 251.000 30.0 140.936 5.790 -999.990 -999.990 1.409 ..P WKT 2010 08 13 13 14 55 31.3200 -97.3300 251.000 122.0 143.201 5.350 -999.990 -999.990 1.432 ..P WKT 2010 08 13 13 19 55 31.3200 -97.3300 251.000 457.0 119.250 3.300 -999.990 -999.990 1.193 ..P WKT 2010 08 13 13 29 55 31.3200 -97.3300 251.000 30.0 134.577 3.370 -999.990 -999.990 1.346 ..P WKT 2010 08 13 13 34 55 31.3200 -97.3300 251.000 122.0 147.635 4.890 -999.990 -999.990 1.476 ..P WKT 2010 08 13 13 39 55 31.3200 -97.3300 251.000 457.0 118.458 6.190 -999.990 -999.990 1.185 ..P WKT 2010 08 13 13 44 55 31.3200 -97.3300 251.000 30.0 141.130 5.990 -999.990 -999.990 1.411 ..P WKT 2010 08 13 13 49 55 31.3200 -97.3300 251.000 122.0 145.683 4.860 -999.990 -999.990 1.457 ..P WKT 2010 08 13 13 54 55 31.3200 -97.3300 251.000 457.0 106.345 3.270 -999.990 -999.990 1.063 ..P WKT 2010 08 13 14 04 55 31.3200 -97.3300 251.000 30.0 142.916 3.350 -999.990 -999.990 1.429 ..P WKT 2010 08 13 14 09 55 31.3200 -97.3300 251.000 122.0 146.650 5.790 -999.990 -999.990 1.467 ..P WKT 2010 08 13 14 14 55 31.3200 -97.3300 251.000 457.0 113.617 5.190 -999.990 -999.990 1.136 ..P WKT 2010 08 13 14 19 55 31.3200 -97.3300 251.000 30.0 138.520 4.220 -999.990 -999.990 1.385 ..P WKT 2010 08 13 14 24 55 31.3200 -97.3300 251.000 122.0 149.493 3.530 -999.990 -999.990 1.495 ..P WKT 2010 08 13 14 29 55 31.3200 -97.3300 251.000 457.0 105.055 3.670 -999.990 -999.990 1.051 ..P WKT 2010 08 13 14 39 55 31.3200 -97.3300 251.000 30.0 122.270 4.040 -999.990 -999.990 1.223 ..P WKT 2010 08 13 14 44 55 31.3200 -97.3300 251.000 122.0 138.529 3.720 -999.990 -999.990 1.385 ..P WKT 2010 08 13 14 49 55 31.3200 -97.3300 251.000 457.0 118.883 4.040 -999.990 -999.990 1.189 ..P WKT 2010 08 13 14 54 55 31.3200 -97.3300 251.000 30.0 121.780 3.750 -999.990 -999.990 1.218 ..P WKT 2010 08 13 14 59 55 31.3200 -97.3300 251.000 122.0 127.461 3.640 -999.990 -999.990 1.275 ..P WKT 2010 08 13 15 04 55 31.3200 -97.3300 251.000 457.0 100.588 3.660 -999.990 -999.990 1.006 ..P WKT 2010 08 13 15 14 55 31.3200 -97.3300 251.000 30.0 123.234 2.960 -999.990 -999.990 1.232 ..P WKT 2010 08 13 15 19 55 31.3200 -97.3300 251.000 122.0 130.461 3.140 -999.990 -999.990 1.305 ..P WKT 2010 08 13 15 24 55 31.3200 -97.3300 251.000 457.0 105.428 2.830 -999.990 -999.990 1.054 ..P WKT 2010 08 13 15 29 55 31.3200 -97.3300 251.000 30.0 129.894 2.990 -999.990 -999.990 1.299 ..P WKT 2010 08 13 15 34 55 31.3200 -97.3300 251.000 122.0 133.504 3.110 -999.990 -999.990 1.335 ..P WKT 2010 08 13 15 39 55 31.3200 -97.3300 251.000 457.0 109.591 2.860 -999.990 -999.990 1.096 ..P WKT 2010 08 13 15 49 55 31.3200 -97.3300 251.000 30.0 124.594 3.350 -999.990 -999.990 1.246 ..P WKT 2010 08 13 15 54 55 31.3200 -97.3300 251.000 122.0 132.787 3.960 -999.990 -999.990 1.328 ..P WKT 2010 08 13 15 59 55 31.3200 -97.3300 251.000 457.0 115.415 3.440 -999.990 -999.990 1.154 ..P WKT 2010 08 13 16 04 55 31.3200 -97.3300 251.000 30.0 110.272 3.330 -999.990 -999.990 1.103 ..P WKT 2010 08 13 16 09 55 31.3200 -97.3300 251.000 122.0 129.299 3.580 -999.990 -999.990 1.293 ..P WKT 2010 08 13 16 14 55 31.3200 -97.3300 251.000 457.0 109.850 4.250 -999.990 -999.990 1.099 ..P WKT 2010 08 13 16 24 55 31.3200 -97.3300 251.000 30.0 114.962 3.810 -999.990 -999.990 1.150 ..P WKT 2010 08 13 16 29 55 31.3200 -97.3300 251.000 122.0 126.879 3.240 -999.990 -999.990 1.269 ..P WKT 2010 08 13 16 34 55 31.3200 -97.3300 251.000 457.0 120.746 3.020 -999.990 -999.990 1.207 ..P WKT 2010 08 13 16 39 55 31.3200 -97.3300 251.000 30.0 112.533 4.930 -999.990 -999.990 1.125 ..P WKT 2010 08 13 16 44 55 31.3200 -97.3300 251.000 122.0 125.417 2.550 -999.990 -999.990 1.254 ..P WKT 2010 08 13 16 49 55 31.3200 -97.3300 251.000 457.0 123.311 2.240 -999.990 -999.990 1.233 ..P WKT 2010 08 13 17 04 55 31.3200 -97.3300 251.000 30.0 121.232 3.440 -999.990 -999.990 1.212 ..P WKT 2010 08 13 17 09 55 31.3200 -97.3300 251.000 122.0 133.798 3.180 -999.990 -999.990 1.338 ..P WKT 2010 08 13 17 14 55 31.3200 -97.3300 251.000 457.0 132.493 3.200 -999.990 -999.990 1.325 ..P WKT 2010 08 13 17 19 55 31.3200 -97.3300 251.000 30.0 125.363 4.020 -999.990 -999.990 1.254 ..P WKT 2010 08 13 17 24 55 31.3200 -97.3300 251.000 122.0 126.416 3.400 -999.990 -999.990 1.264 ..P WKT 2010 08 13 17 29 55 31.3200 -97.3300 251.000 457.0 114.158 3.020 -999.990 -999.990 1.142 ..P WKT 2010 08 13 17 39 55 31.3200 -97.3300 251.000 30.0 114.912 3.880 -999.990 -999.990 1.149 ..P WKT 2010 08 13 17 44 55 31.3200 -97.3300 251.000 122.0 121.126 3.820 -999.990 -999.990 1.211 ..P WKT 2010 08 13 17 49 55 31.3200 -97.3300 251.000 457.0 106.274 3.410 -999.990 -999.990 1.063 ..P WKT 2010 08 13 17 54 55 31.3200 -97.3300 251.000 30.0 103.757 2.870 -999.990 -999.990 1.038 ..P WKT 2010 08 13 17 59 55 31.3200 -97.3300 251.000 122.0 117.313 2.890 -999.990 -999.990 1.173 ..P WKT 2010 08 13 18 04 55 31.3200 -97.3300 251.000 457.0 108.423 2.880 -999.990 -999.990 1.084 ..P WKT 2010 08 13 18 14 55 31.3200 -97.3300 251.000 30.0 102.067 3.550 -999.990 -999.990 1.021 ..P WKT 2010 08 13 18 19 55 31.3200 -97.3300 251.000 122.0 106.259 3.100 -999.990 -999.990 1.063 ..P WKT 2010 08 13 18 24 55 31.3200 -97.3300 251.000 457.0 97.711 4.470 -999.990 -999.990 0.977 ..P WKT 2010 08 13 18 29 55 31.3200 -97.3300 251.000 30.0 98.580 3.310 -999.990 -999.990 0.986 ..P WKT 2010 08 13 18 34 55 31.3200 -97.3300 251.000 122.0 103.048 2.770 -999.990 -999.990 1.030 ..P WKT 2010 08 13 18 39 55 31.3200 -97.3300 251.000 457.0 91.458 3.600 -999.990 -999.990 0.915 ..P WKT 2010 08 13 18 49 55 31.3200 -97.3300 251.000 30.0 98.890 3.260 -999.990 -999.990 0.989 ..P WKT 2010 08 13 18 54 55 31.3200 -97.3300 251.000 122.0 108.496 3.470 -999.990 -999.990 1.085 ..P WKT 2010 08 13 18 59 55 31.3200 -97.3300 251.000 457.0 103.987 2.910 -999.990 -999.990 1.040 ..P WKT 2010 08 13 19 04 55 31.3200 -97.3300 251.000 30.0 104.736 4.480 -999.990 -999.990 1.047 ..P WKT 2010 08 13 19 09 55 31.3200 -97.3300 251.000 122.0 116.828 3.010 -999.990 -999.990 1.168 ..P WKT 2010 08 13 19 14 55 31.3200 -97.3300 251.000 457.0 113.979 3.150 -999.990 -999.990 1.140 ..P WKT 2010 08 13 19 24 55 31.3200 -97.3300 251.000 30.0 109.646 3.090 -999.990 -999.990 1.096 ..P WKT 2010 08 13 19 29 55 31.3200 -97.3300 251.000 122.0 118.671 3.420 -999.990 -999.990 1.187 ..P WKT 2010 08 13 19 34 55 31.3200 -97.3300 251.000 457.0 107.508 3.020 -999.990 -999.990 1.075 ..P WKT 2010 08 13 19 39 55 31.3200 -97.3300 251.000 30.0 108.236 3.470 -999.990 -999.990 1.082 ..P WKT 2010 08 13 19 44 55 31.3200 -97.3300 251.000 122.0 116.705 2.900 -999.990 -999.990 1.167 ..P WKT 2010 08 13 19 49 55 31.3200 -97.3300 251.000 457.0 112.594 3.210 -999.990 -999.990 1.126 ..P WKT 2010 08 13 19 59 55 31.3200 -97.3300 251.000 30.0 111.818 2.920 -999.990 -999.990 1.118 ..P WKT 2010 08 13 20 04 55 31.3200 -97.3300 251.000 122.0 118.467 3.440 -999.990 -999.990 1.185 ..P WKT 2010 08 13 20 09 55 31.3200 -97.3300 251.000 457.0 102.321 2.620 -999.990 -999.990 1.023 ..P WKT 2010 08 13 20 14 55 31.3200 -97.3300 251.000 30.0 108.553 3.730 -999.990 -999.990 1.086 ..P WKT 2010 08 13 20 19 55 31.3200 -97.3300 251.000 122.0 114.647 4.070 -999.990 -999.990 1.146 ..P WKT 2010 08 13 20 24 55 31.3200 -97.3300 251.000 457.0 104.997 3.780 -999.990 -999.990 1.050 ..P WKT 2010 08 13 20 34 55 31.3200 -97.3300 251.000 30.0 94.520 3.970 -999.990 -999.990 0.945 ..P WKT 2010 08 13 20 39 55 31.3200 -97.3300 251.000 122.0 107.357 2.890 -999.990 -999.990 1.074 ..P WKT 2010 08 13 20 44 55 31.3200 -97.3300 251.000 457.0 99.073 2.210 -999.990 -999.990 0.991 ..P WKT 2010 08 13 20 49 55 31.3200 -97.3300 251.000 30.0 97.140 2.660 -999.990 -999.990 0.971 ..P WKT 2010 08 13 20 54 55 31.3200 -97.3300 251.000 122.0 109.420 3.420 -999.990 -999.990 1.094 ..P WKT 2010 08 13 20 59 55 31.3200 -97.3300 251.000 457.0 94.515 3.810 -999.990 -999.990 0.945 ..P WKT 2010 08 13 21 09 55 31.3200 -97.3300 251.000 30.0 95.636 2.230 -999.990 -999.990 0.956 ..P WKT 2010 08 13 21 14 55 31.3200 -97.3300 251.000 122.0 109.035 2.440 -999.990 -999.990 1.090 ..P WKT 2010 08 13 21 19 55 31.3200 -97.3300 251.000 457.0 100.225 4.390 -999.990 -999.990 1.002 ..P WKT 2010 08 13 21 24 55 31.3200 -97.3300 251.000 30.0 100.795 2.560 -999.990 -999.990 1.008 ..P WKT 2010 08 13 21 29 55 31.3200 -97.3300 251.000 122.0 106.466 2.960 -999.990 -999.990 1.065 ..P WKT 2010 08 13 21 34 55 31.3200 -97.3300 251.000 457.0 102.071 3.620 -999.990 -999.990 1.021 ..P WKT 2010 08 13 21 44 55 31.3200 -97.3300 251.000 30.0 98.366 2.940 -999.990 -999.990 0.984 ..P WKT 2010 08 13 21 49 55 31.3200 -97.3300 251.000 122.0 106.910 2.860 -999.990 -999.990 1.069 ..P WKT 2010 08 13 21 54 55 31.3200 -97.3300 251.000 457.0 104.151 2.420 -999.990 -999.990 1.042 ..P WKT 2010 08 13 21 59 55 31.3200 -97.3300 251.000 30.0 101.393 2.390 -999.990 -999.990 1.014 ..P WKT 2010 08 13 22 04 55 31.3200 -97.3300 251.000 122.0 104.698 2.530 -999.990 -999.990 1.047 ..P WKT 2010 08 13 22 09 55 31.3200 -97.3300 251.000 457.0 102.216 3.030 -999.990 -999.990 1.022 ..P WKT 2010 08 13 22 19 55 31.3200 -97.3300 251.000 30.0 98.435 2.330 -999.990 -999.990 0.984 ..P WKT 2010 08 13 22 24 55 31.3200 -97.3300 251.000 122.0 96.309 3.460 -999.990 -999.990 0.963 ..P WKT 2010 08 13 22 29 55 31.3200 -97.3300 251.000 457.0 94.734 3.450 -999.990 -999.990 0.947 ..P WKT 2010 08 13 22 34 55 31.3200 -97.3300 251.000 30.0 92.609 2.600 -999.990 -999.990 0.926 ..P WKT 2010 08 13 22 39 55 31.3200 -97.3300 251.000 122.0 101.498 1.920 -999.990 -999.990 1.015 ..P WKT 2010 08 13 22 44 55 31.3200 -97.3300 251.000 457.0 88.635 2.080 -999.990 -999.990 0.886 ..P WKT 2010 08 13 22 54 55 31.3200 -97.3300 251.000 30.0 94.729 1.730 -999.990 -999.990 0.947 ..P WKT 2010 08 13 22 59 55 31.3200 -97.3300 251.000 122.0 103.220 3.350 -999.990 -999.990 1.032 ..P WKT 2010 08 13 23 04 55 31.3200 -97.3300 251.000 457.0 100.978 1.780 -999.990 -999.990 1.010 ..P WKT 2010 08 13 23 09 55 31.3200 -97.3300 251.000 30.0 97.635 3.060 -999.990 -999.990 0.976 ..P WKT 2010 08 13 23 14 55 31.3200 -97.3300 251.000 122.0 108.323 1.790 -999.990 -999.990 1.083 ..P WKT 2010 08 13 23 19 55 31.3200 -97.3300 251.000 457.0 98.379 3.960 -999.990 -999.990 0.984 ..P WKT 2010 08 13 23 29 55 31.3200 -97.3300 251.000 30.0 92.853 1.720 -999.990 -999.990 0.929 ..P WKT 2010 08 13 23 34 55 31.3200 -97.3300 251.000 122.0 99.469 3.910 -999.990 -999.990 0.995 ..P WKT 2010 08 13 23 39 55 31.3200 -97.3300 251.000 457.0 96.185 2.010 -999.990 -999.990 0.962 ..P WKT 2010 08 13 23 44 55 31.3200 -97.3300 251.000 30.0 95.377 2.600 -999.990 -999.990 0.954 ..P WKT 2010 08 13 23 49 55 31.3200 -97.3300 251.000 122.0 104.052 3.160 -999.990 -999.990 1.041 ..P WKT 2010 08 14 00 09 55 31.3200 -97.3300 251.000 457.0 100.784 2.660 -999.990 -999.990 1.008 ..P WKT 2010 08 14 00 10 25 31.3200 -97.3300 251.000 457.0 99.642 2.170 -999.990 -999.990 0.996 ..P WKT 2010 08 14 00 10 55 31.3200 -97.3300 251.000 457.0 101.799 2.180 -999.990 -999.990 1.018 ..P WKT 2010 08 14 00 11 25 31.3200 -97.3300 251.000 457.0 105.605 3.390 -999.990 -999.990 1.056 ..P WKT 2010 08 14 00 11 55 31.3200 -97.3300 251.000 457.0 99.239 2.600 -999.990 -999.990 0.992 ..P WKT 2010 08 14 00 12 25 31.3200 -97.3300 251.000 457.0 103.871 2.800 -999.990 -999.990 1.039 ..P WKT 2010 08 14 00 12 55 31.3200 -97.3300 251.000 457.0 103.966 2.650 -999.990 -999.990 1.040 ..P WKT 2010 08 14 00 13 25 31.3200 -97.3300 251.000 457.0 105.710 3.280 -999.990 -999.990 1.057 ..P WKT 2010 08 14 00 13 55 31.3200 -97.3300 251.000 457.0 102.506 3.630 -999.990 -999.990 1.025 ..P WKT 2010 08 14 00 14 25 31.3200 -97.3300 251.000 457.0 103.839 3.090 -999.990 -999.990 1.038 ..P WKT 2010 08 14 00 14 55 31.3200 -97.3300 251.000 457.0 99.260 3.770 -999.990 -999.990 0.993 ..P WKT 2010 08 14 00 19 55 31.3200 -97.3300 251.000 30.0 95.260 3.210 -999.990 -999.990 0.953 ..P WKT 2010 08 14 00 24 55 31.3200 -97.3300 251.000 122.0 98.410 3.080 -999.990 -999.990 0.984 ..P WKT 2010 08 14 00 29 55 31.3200 -97.3300 251.000 457.0 98.121 5.340 -999.990 -999.990 0.981 ..P WKT 2010 08 14 00 34 55 31.3200 -97.3300 251.000 30.0 90.269 2.070 -999.990 -999.990 0.903 ..P WKT 2010 08 14 00 39 55 31.3200 -97.3300 251.000 122.0 105.249 2.760 -999.990 -999.990 1.052 ..P WKT 2010 08 14 00 44 55 31.3200 -97.3300 251.000 457.0 97.946 2.500 -999.990 -999.990 0.979 ..P WKT 2010 08 14 00 54 55 31.3200 -97.3300 251.000 30.0 95.184 2.490 -999.990 -999.990 0.952 ..P WKT 2010 08 14 00 59 55 31.3200 -97.3300 251.000 122.0 105.645 3.070 -999.990 -999.990 1.056 ..P WKT 2010 08 14 01 04 55 31.3200 -97.3300 251.000 457.0 96.152 2.750 -999.990 -999.990 0.962 ..P WKT 2010 08 14 01 09 55 31.3200 -97.3300 251.000 30.0 103.725 3.840 -999.990 -999.990 1.037 ..P WKT 2010 08 14 01 14 55 31.3200 -97.3300 251.000 122.0 106.344 3.270 -999.990 -999.990 1.063 ..P WKT 2010 08 14 01 19 55 31.3200 -97.3300 251.000 457.0 96.710 3.470 -999.990 -999.990 0.967 ..P WKT 2010 08 14 01 29 55 31.3200 -97.3300 251.000 30.0 105.076 3.940 -999.990 -999.990 1.051 ..P WKT 2010 08 14 01 34 55 31.3200 -97.3300 251.000 122.0 109.034 3.280 -999.990 -999.990 1.090 ..P WKT 2010 08 14 01 39 55 31.3200 -97.3300 251.000 457.0 101.561 2.890 -999.990 -999.990 1.016 ..P WKT 2010 08 14 01 44 55 31.3200 -97.3300 251.000 30.0 105.932 3.000 -999.990 -999.990 1.059 ..P WKT 2010 08 14 01 49 55 31.3200 -97.3300 251.000 122.0 106.172 2.790 -999.990 -999.990 1.062 ..P WKT 2010 08 14 01 54 55 31.3200 -97.3300 251.000 457.0 96.216 2.160 -999.990 -999.990 0.962 ..P WKT 2010 08 14 02 04 55 31.3200 -97.3300 251.000 30.0 115.082 2.180 -999.990 -999.990 1.151 ..P WKT 2010 08 14 02 09 55 31.3200 -97.3300 251.000 122.0 109.455 2.710 -999.990 -999.990 1.095 ..P WKT 2010 08 14 02 14 55 31.3200 -97.3300 251.000 457.0 92.247 3.250 -999.990 -999.990 0.922 ..P WKT 2010 08 14 02 19 55 31.3200 -97.3300 251.000 30.0 111.156 3.100 -999.990 -999.990 1.112 ..P WKT 2010 08 14 02 24 55 31.3200 -97.3300 251.000 122.0 113.524 3.550 -999.990 -999.990 1.135 ..P WKT 2010 08 14 02 29 55 31.3200 -97.3300 251.000 457.0 87.211 3.150 -999.990 -999.990 0.872 ..P WKT 2010 08 14 02 39 55 31.3200 -97.3300 251.000 30.0 102.661 3.140 -999.990 -999.990 1.027 ..P WKT 2010 08 14 02 44 55 31.3200 -97.3300 251.000 122.0 91.195 2.430 -999.990 -999.990 0.912 ..P WKT 2010 08 14 02 49 55 31.3200 -97.3300 251.000 457.0 86.900 2.730 -999.990 -999.990 0.869 ..P WKT 2010 08 14 02 54 55 31.3200 -97.3300 251.000 30.0 104.129 3.260 -999.990 -999.990 1.041 ..P WKT 2010 08 14 02 59 55 31.3200 -97.3300 251.000 122.0 94.591 4.850 -999.990 -999.990 0.946 ..P WKT 2010 08 14 03 04 55 31.3200 -97.3300 251.000 457.0 90.019 3.550 -999.990 -999.990 0.900 ..P WKT 2010 08 14 03 14 55 31.3200 -97.3300 251.000 30.0 102.427 3.720 -999.990 -999.990 1.024 ..P WKT 2010 08 14 03 19 55 31.3200 -97.3300 251.000 122.0 97.874 3.010 -999.990 -999.990 0.979 ..P WKT 2010 08 14 03 24 55 31.3200 -97.3300 251.000 457.0 97.462 3.190 -999.990 -999.990 0.975 ..P WKT 2010 08 14 03 29 55 31.3200 -97.3300 251.000 30.0 99.260 5.010 -999.990 -999.990 0.993 ..P WKT 2010 08 14 03 34 55 31.3200 -97.3300 251.000 122.0 90.838 3.100 -999.990 -999.990 0.908 ..P WKT 2010 08 14 03 39 55 31.3200 -97.3300 251.000 457.0 92.912 3.170 -999.990 -999.990 0.929 ..P WKT 2010 08 14 03 49 55 31.3200 -97.3300 251.000 30.0 95.521 3.060 -999.990 -999.990 0.955 ..P WKT 2010 08 14 03 54 55 31.3200 -97.3300 251.000 122.0 91.082 3.550 -999.990 -999.990 0.911 ..P WKT 2010 08 14 03 59 55 31.3200 -97.3300 251.000 457.0 89.406 2.650 -999.990 -999.990 0.894 ..P WKT 2010 08 14 04 04 55 31.3200 -97.3300 251.000 30.0 99.062 2.530 -999.990 -999.990 0.991 ..P WKT 2010 08 14 04 09 55 31.3200 -97.3300 251.000 122.0 101.118 4.110 -999.990 -999.990 1.011 ..P WKT 2010 08 14 04 14 55 31.3200 -97.3300 251.000 457.0 94.052 3.660 -999.990 -999.990 0.941 ..P WKT 2010 08 14 04 24 55 31.3200 -97.3300 251.000 30.0 106.618 2.650 -999.990 -999.990 1.066 ..P WKT 2010 08 14 04 29 55 31.3200 -97.3300 251.000 122.0 107.036 2.230 -999.990 -999.990 1.070 ..P WKT 2010 08 14 04 34 55 31.3200 -97.3300 251.000 457.0 100.264 2.450 -999.990 -999.990 1.003 ..P WKT 2010 08 14 04 39 55 31.3200 -97.3300 251.000 30.0 102.894 2.590 -999.990 -999.990 1.029 ..P WKT 2010 08 14 04 44 55 31.3200 -97.3300 251.000 122.0 109.260 2.310 -999.990 -999.990 1.093 ..P WKT 2010 08 14 04 49 55 31.3200 -97.3300 251.000 457.0 100.964 2.400 -999.990 -999.990 1.010 ..P WKT 2010 08 14 05 04 55 31.3200 -97.3300 251.000 30.0 101.561 2.960 -999.990 -999.990 1.016 ..P WKT 2010 08 14 05 09 55 31.3200 -97.3300 251.000 122.0 104.072 3.550 -999.990 -999.990 1.041 ..P WKT 2010 08 14 05 14 55 31.3200 -97.3300 251.000 457.0 91.636 5.160 -999.990 -999.990 0.916 ..P WKT 2010 08 14 05 19 55 31.3200 -97.3300 251.000 30.0 96.777 3.860 -999.990 -999.990 0.968 ..P WKT 2010 08 14 05 24 55 31.3200 -97.3300 251.000 122.0 103.997 3.500 -999.990 -999.990 1.040 ..P WKT 2010 08 14 05 29 55 31.3200 -97.3300 251.000 457.0 93.494 3.180 -999.990 -999.990 0.935 ..P WKT 2010 08 14 05 39 55 31.3200 -97.3300 251.000 30.0 90.072 3.080 -999.990 -999.990 0.901 ..P WKT 2010 08 14 05 44 55 31.3200 -97.3300 251.000 122.0 100.206 3.020 -999.990 -999.990 1.002 ..P WKT 2010 08 14 05 49 55 31.3200 -97.3300 251.000 457.0 88.176 3.440 -999.990 -999.990 0.882 ..P WKT 2010 08 14 05 54 55 31.3200 -97.3300 251.000 30.0 94.987 4.340 -999.990 -999.990 0.950 ..P WKT 2010 08 14 05 59 55 31.3200 -97.3300 251.000 122.0 98.749 3.220 -999.990 -999.990 0.987 ..P WKT 2010 08 14 06 04 55 31.3200 -97.3300 251.000 457.0 86.439 2.740 -999.990 -999.990 0.864 ..P WKT 2010 08 14 06 14 55 31.3200 -97.3300 251.000 30.0 97.689 3.230 -999.990 -999.990 0.977 ..P WKT 2010 08 14 06 19 55 31.3200 -97.3300 251.000 122.0 102.958 4.880 -999.990 -999.990 1.030 ..P WKT 2010 08 14 06 24 55 31.3200 -97.3300 251.000 457.0 92.148 2.810 -999.990 -999.990 0.921 ..P WKT 2010 08 14 06 29 55 31.3200 -97.3300 251.000 30.0 96.586 4.100 -999.990 -999.990 0.966 ..P WKT 2010 08 14 06 34 55 31.3200 -97.3300 251.000 122.0 99.640 3.450 -999.990 -999.990 0.996 ..P WKT 2010 08 14 06 39 55 31.3200 -97.3300 251.000 457.0 92.431 3.370 -999.990 -999.990 0.924 ..P WKT 2010 08 14 06 49 55 31.3200 -97.3300 251.000 30.0 99.331 3.930 -999.990 -999.990 0.993 ..P WKT 2010 08 14 06 54 55 31.3200 -97.3300 251.000 122.0 103.456 4.030 -999.990 -999.990 1.035 ..P WKT 2010 08 14 06 59 55 31.3200 -97.3300 251.000 457.0 89.545 3.680 -999.990 -999.990 0.895 ..P WKT 2010 08 14 07 04 55 31.3200 -97.3300 251.000 30.0 95.890 3.700 -999.990 -999.990 0.959 ..P WKT 2010 08 14 07 09 55 31.3200 -97.3300 251.000 122.0 101.959 4.440 -999.990 -999.990 1.020 ..P WKT 2010 08 14 07 14 55 31.3200 -97.3300 251.000 457.0 96.371 4.870 -999.990 -999.990 0.964 ..P WKT 2010 08 14 07 24 55 31.3200 -97.3300 251.000 30.0 99.549 4.890 -999.990 -999.990 0.995 ..P WKT 2010 08 14 07 29 55 31.3200 -97.3300 251.000 122.0 99.988 4.070 -999.990 -999.990 1.000 ..P WKT 2010 08 14 07 34 55 31.3200 -97.3300 251.000 457.0 98.623 3.150 -999.990 -999.990 0.986 ..P WKT 2010 08 14 07 39 55 31.3200 -97.3300 251.000 30.0 92.812 3.210 -999.990 -999.990 0.928 ..P WKT 2010 08 14 07 44 55 31.3200 -97.3300 251.000 122.0 107.974 4.170 -999.990 -999.990 1.080 ..P WKT 2010 08 14 07 49 55 31.3200 -97.3300 251.000 457.0 103.552 2.830 -999.990 -999.990 1.036 ..P WKT 2010 08 14 07 59 55 31.3200 -97.3300 251.000 30.0 94.925 1.940 -999.990 -999.990 0.949 ..P WKT 2010 08 14 08 04 55 31.3200 -97.3300 251.000 122.0 105.031 3.280 -999.990 -999.990 1.050 ..P WKT 2010 08 14 08 09 55 31.3200 -97.3300 251.000 457.0 94.572 2.950 -999.990 -999.990 0.946 ..P WKT 2010 08 14 08 14 55 31.3200 -97.3300 251.000 30.0 98.566 3.480 -999.990 -999.990 0.986 ..P WKT 2010 08 14 08 19 55 31.3200 -97.3300 251.000 122.0 103.394 3.150 -999.990 -999.990 1.034 ..P WKT 2010 08 14 08 24 55 31.3200 -97.3300 251.000 457.0 96.545 4.130 -999.990 -999.990 0.965 ..P WKT 2010 08 14 08 34 55 31.3200 -97.3300 251.000 30.0 98.636 2.310 -999.990 -999.990 0.986 ..P WKT 2010 08 14 08 39 55 31.3200 -97.3300 251.000 122.0 97.844 3.960 -999.990 -999.990 0.978 ..P WKT 2010 08 14 08 44 55 31.3200 -97.3300 251.000 457.0 89.680 2.730 -999.990 -999.990 0.897 ..P WKT 2010 08 14 08 49 55 31.3200 -97.3300 251.000 30.0 98.207 3.410 -999.990 -999.990 0.982 ..P WKT 2010 08 14 08 54 55 31.3200 -97.3300 251.000 122.0 95.466 3.800 -999.990 -999.990 0.955 ..P WKT 2010 08 14 08 59 55 31.3200 -97.3300 251.000 457.0 86.325 3.070 -999.990 -999.990 0.863 ..P WKT 2010 08 14 09 09 55 31.3200 -97.3300 251.000 30.0 89.987 2.210 -999.990 -999.990 0.900 ..P WKT 2010 08 14 09 14 55 31.3200 -97.3300 251.000 122.0 90.684 2.380 -999.990 -999.990 0.907 ..P WKT 2010 08 14 09 19 55 31.3200 -97.3300 251.000 457.0 92.913 2.930 -999.990 -999.990 0.929 ..P WKT 2010 08 14 09 24 55 31.3200 -97.3300 251.000 30.0 89.435 3.780 -999.990 -999.990 0.894 ..P WKT 2010 08 14 09 29 55 31.3200 -97.3300 251.000 122.0 94.449 3.350 -999.990 -999.990 0.944 ..P WKT 2010 08 14 09 34 55 31.3200 -97.3300 251.000 457.0 89.299 2.510 -999.990 -999.990 0.893 ..P WKT 2010 08 14 09 44 55 31.3200 -97.3300 251.000 30.0 83.154 2.460 -999.990 -999.990 0.832 ..P WKT 2010 08 14 09 49 55 31.3200 -97.3300 251.000 122.0 94.418 3.510 -999.990 -999.990 0.944 ..P WKT 2010 08 14 09 54 55 31.3200 -97.3300 251.000 457.0 90.081 4.070 -999.990 -999.990 0.901 ..P WKT 2010 08 14 09 59 55 31.3200 -97.3300 251.000 30.0 88.252 4.890 -999.990 -999.990 0.883 ..P WKT 2010 08 14 10 04 55 31.3200 -97.3300 251.000 122.0 95.061 4.710 -999.990 -999.990 0.951 ..P WKT 2010 08 14 10 09 55 31.3200 -97.3300 251.000 457.0 87.936 4.760 -999.990 -999.990 0.879 ..P WKT 2010 08 14 10 19 55 31.3200 -97.3300 251.000 30.0 89.493 4.710 -999.990 -999.990 0.895 ..P WKT 2010 08 14 10 24 55 31.3200 -97.3300 251.000 122.0 99.851 4.420 -999.990 -999.990 0.999 ..P WKT 2010 08 14 10 29 55 31.3200 -97.3300 251.000 457.0 90.413 4.870 -999.990 -999.990 0.904 ..P WKT 2010 08 14 10 34 55 31.3200 -97.3300 251.000 30.0 82.367 5.370 -999.990 -999.990 0.824 ..P WKT 2010 08 14 10 39 55 31.3200 -97.3300 251.000 122.0 88.544 3.760 -999.990 -999.990 0.885 ..P WKT 2010 08 14 10 44 55 31.3200 -97.3300 251.000 457.0 86.354 6.970 -999.990 -999.990 0.864 ..P WKT 2010 08 14 10 54 55 31.3200 -97.3300 251.000 30.0 87.951 3.620 -999.990 -999.990 0.880 ..P WKT 2010 08 14 10 59 55 31.3200 -97.3300 251.000 122.0 90.623 3.650 -999.990 -999.990 0.906 ..P WKT 2010 08 14 11 04 55 31.3200 -97.3300 251.000 457.0 82.133 3.770 -999.990 -999.990 0.821 ..P WKT 2010 08 14 11 09 55 31.3200 -97.3300 251.000 30.0 94.295 3.060 -999.990 -999.990 0.943 ..P WKT 2010 08 14 11 14 55 31.3200 -97.3300 251.000 122.0 95.015 3.010 -999.990 -999.990 0.950 ..P WKT 2010 08 14 11 19 55 31.3200 -97.3300 251.000 457.0 93.502 2.890 -999.990 -999.990 0.935 ..P WKT 2010 08 14 11 29 55 31.3200 -97.3300 251.000 30.0 85.882 4.140 -999.990 -999.990 0.859 ..P WKT 2010 08 14 11 34 55 31.3200 -97.3300 251.000 122.0 101.977 5.160 -999.990 -999.990 1.020 ..P WKT 2010 08 14 11 39 55 31.3200 -97.3300 251.000 457.0 97.406 4.510 -999.990 -999.990 0.974 ..P WKT 2010 08 14 11 44 55 31.3200 -97.3300 251.000 30.0 95.349 3.270 -999.990 -999.990 0.953 ..P WKT 2010 08 14 11 49 55 31.3200 -97.3300 251.000 122.0 92.872 4.240 -999.990 -999.990 0.929 ..P WKT 2010 08 14 12 09 55 31.3200 -97.3300 251.000 457.0 96.235 3.770 -999.990 -999.990 0.962 ..P WKT 2010 08 14 12 10 25 31.3200 -97.3300 251.000 457.0 94.436 3.820 -999.990 -999.990 0.944 ..P WKT 2010 08 14 12 10 55 31.3200 -97.3300 251.000 457.0 92.218 3.620 -999.990 -999.990 0.922 ..P WKT 2010 08 14 12 11 25 31.3200 -97.3300 251.000 457.0 98.103 3.780 -999.990 -999.990 0.981 ..P WKT 2010 08 14 12 11 55 31.3200 -97.3300 251.000 457.0 95.885 4.170 -999.990 -999.990 0.959 ..P WKT 2010 08 14 12 12 25 31.3200 -97.3300 251.000 457.0 94.365 4.210 -999.990 -999.990 0.944 ..P WKT 2010 08 14 12 12 55 31.3200 -97.3300 251.000 457.0 95.221 3.500 -999.990 -999.990 0.952 ..P WKT 2010 08 14 12 13 25 31.3200 -97.3300 251.000 457.0 95.517 3.540 -999.990 -999.990 0.955 ..P WKT 2010 08 14 12 13 55 31.3200 -97.3300 251.000 457.0 96.234 3.910 -999.990 -999.990 0.962 ..P WKT 2010 08 14 12 14 25 31.3200 -97.3300 251.000 457.0 91.780 3.540 -999.990 -999.990 0.918 ..P WKT 2010 08 14 12 14 55 31.3200 -97.3300 251.000 457.0 88.305 3.860 -999.990 -999.990 0.883 ..P WKT 2010 08 14 12 19 55 31.3200 -97.3300 251.000 30.0 102.028 3.990 -999.990 -999.990 1.020 ..P WKT 2010 08 14 12 24 55 31.3200 -97.3300 251.000 122.0 93.260 4.150 -999.990 -999.990 0.933 ..P WKT 2010 08 14 12 29 55 31.3200 -97.3300 251.000 457.0 96.786 3.070 -999.990 -999.990 0.968 ..P WKT 2010 08 14 12 34 55 31.3200 -97.3300 251.000 30.0 93.745 3.120 -999.990 -999.990 0.937 ..P WKT 2010 08 14 12 39 55 31.3200 -97.3300 251.000 122.0 99.645 2.830 -999.990 -999.990 0.996 ..P WKT 2010 08 14 12 44 55 31.3200 -97.3300 251.000 457.0 92.973 2.830 -999.990 -999.990 0.930 ..P WKT 2010 08 14 12 54 55 31.3200 -97.3300 251.000 30.0 92.808 2.770 -999.990 -999.990 0.928 ..P WKT 2010 08 14 12 59 55 31.3200 -97.3300 251.000 122.0 100.292 2.490 -999.990 -999.990 1.003 ..P WKT 2010 08 14 13 04 55 31.3200 -97.3300 251.000 457.0 82.078 2.340 -999.990 -999.990 0.821 ..P WKT 2010 08 14 13 09 55 31.3200 -97.3300 251.000 30.0 96.265 2.880 -999.990 -999.990 0.963 ..P WKT 2010 08 14 13 14 55 31.3200 -97.3300 251.000 122.0 103.609 3.040 -999.990 -999.990 1.036 ..P WKT 2010 08 14 13 19 55 31.3200 -97.3300 251.000 457.0 86.095 2.880 -999.990 -999.990 0.861 ..P WKT 2010 08 14 13 29 55 31.3200 -97.3300 251.000 30.0 101.639 3.710 -999.990 -999.990 1.016 ..P WKT 2010 08 14 13 34 55 31.3200 -97.3300 251.000 122.0 104.394 2.760 -999.990 -999.990 1.044 ..P WKT 2010 08 14 13 39 55 31.3200 -97.3300 251.000 457.0 88.018 4.220 -999.990 -999.990 0.880 ..P WKT 2010 08 14 13 44 55 31.3200 -97.3300 251.000 30.0 97.056 5.020 -999.990 -999.990 0.971 ..P WKT 2010 08 14 13 49 55 31.3200 -97.3300 251.000 122.0 106.373 4.680 -999.990 -999.990 1.064 ..P WKT 2010 08 14 13 54 55 31.3200 -97.3300 251.000 457.0 84.414 2.570 -999.990 -999.990 0.844 ..P WKT 2010 08 14 14 04 55 31.3200 -97.3300 251.000 30.0 99.676 2.700 -999.990 -999.990 0.997 ..P WKT 2010 08 14 14 09 55 31.3200 -97.3300 251.000 122.0 107.855 3.730 -999.990 -999.990 1.079 ..P WKT 2010 08 14 14 14 55 31.3200 -97.3300 251.000 457.0 83.924 4.140 -999.990 -999.990 0.839 ..P WKT 2010 08 14 14 19 55 31.3200 -97.3300 251.000 30.0 90.428 3.550 -999.990 -999.990 0.904 ..P WKT 2010 08 14 14 24 55 31.3200 -97.3300 251.000 122.0 105.586 3.180 -999.990 -999.990 1.056 ..P WKT 2010 08 14 14 29 55 31.3200 -97.3300 251.000 457.0 89.474 2.650 -999.990 -999.990 0.895 ..P WKT 2010 08 14 14 39 55 31.3200 -97.3300 251.000 30.0 90.914 2.850 -999.990 -999.990 0.909 ..P WKT 2010 08 14 14 44 55 31.3200 -97.3300 251.000 122.0 102.322 3.140 -999.990 -999.990 1.023 ..P WKT 2010 08 14 14 49 55 31.3200 -97.3300 251.000 457.0 93.351 3.400 -999.990 -999.990 0.934 ..P WKT 2010 08 14 14 54 55 31.3200 -97.3300 251.000 30.0 96.662 3.210 -999.990 -999.990 0.967 ..P WKT 2010 08 14 14 59 55 31.3200 -97.3300 251.000 122.0 102.207 3.430 -999.990 -999.990 1.022 ..P WKT 2010 08 14 15 04 55 31.3200 -97.3300 251.000 457.0 83.467 3.210 -999.990 -999.990 0.835 ..P WKT 2010 08 14 15 14 55 31.3200 -97.3300 251.000 30.0 92.303 3.350 -999.990 -999.990 0.923 ..P WKT 2010 08 14 15 19 55 31.3200 -97.3300 251.000 122.0 99.502 4.690 -999.990 -999.990 0.995 ..P WKT 2010 08 14 15 24 55 31.3200 -97.3300 251.000 457.0 92.467 3.290 -999.990 -999.990 0.925 ..P WKT 2010 08 14 15 29 55 31.3200 -97.3300 251.000 30.0 94.920 3.600 -999.990 -999.990 0.949 ..P WKT 2010 08 14 15 34 55 31.3200 -97.3300 251.000 122.0 101.002 3.710 -999.990 -999.990 1.010 ..P WKT 2010 08 14 15 39 55 31.3200 -97.3300 251.000 457.0 91.316 4.070 -999.990 -999.990 0.913 ..P WKT 2010 08 14 15 49 55 31.3200 -97.3300 251.000 30.0 90.682 3.890 -999.990 -999.990 0.907 ..P WKT 2010 08 14 15 54 55 31.3200 -97.3300 251.000 122.0 105.036 3.860 -999.990 -999.990 1.050 ..P WKT 2010 08 14 15 59 55 31.3200 -97.3300 251.000 457.0 95.251 3.830 -999.990 -999.990 0.953 ..P WKT 2010 08 14 16 04 55 31.3200 -97.3300 251.000 30.0 90.070 3.980 -999.990 -999.990 0.901 ..P WKT 2010 08 14 16 09 55 31.3200 -97.3300 251.000 122.0 102.470 5.270 -999.990 -999.990 1.025 ..P WKT 2010 08 14 16 14 55 31.3200 -97.3300 251.000 457.0 92.964 4.820 -999.990 -999.990 0.930 ..P WKT 2010 08 14 16 24 55 31.3200 -97.3300 251.000 30.0 92.829 4.990 -999.990 -999.990 0.928 ..P WKT 2010 08 14 16 29 55 31.3200 -97.3300 251.000 122.0 110.985 4.650 -999.990 -999.990 1.110 ..P WKT 2010 08 14 16 34 55 31.3200 -97.3300 251.000 457.0 91.617 4.040 -999.990 -999.990 0.916 ..P WKT 2010 08 14 16 39 55 31.3200 -97.3300 251.000 30.0 95.963 4.150 -999.990 -999.990 0.960 ..P WKT 2010 08 14 16 44 55 31.3200 -97.3300 251.000 122.0 110.631 3.850 -999.990 -999.990 1.106 ..P WKT 2010 08 14 16 49 55 31.3200 -97.3300 251.000 457.0 99.772 2.970 -999.990 -999.990 0.998 ..P WKT 2010 08 14 17 04 55 31.3200 -97.3300 251.000 30.0 96.729 2.660 -999.990 -999.990 0.967 ..P WKT 2010 08 14 17 09 55 31.3200 -97.3300 251.000 122.0 103.077 3.720 -999.990 -999.990 1.031 ..P WKT 2010 08 14 17 14 55 31.3200 -97.3300 251.000 457.0 95.895 3.430 -999.990 -999.990 0.959 ..P WKT 2010 08 14 17 19 55 31.3200 -97.3300 251.000 30.0 90.528 3.700 -999.990 -999.990 0.905 ..P WKT 2010 08 14 17 24 55 31.3200 -97.3300 251.000 122.0 99.665 3.320 -999.990 -999.990 0.997 ..P WKT 2010 08 14 17 29 55 31.3200 -97.3300 251.000 457.0 100.712 4.150 -999.990 -999.990 1.007 ..P WKT 2010 08 14 17 39 55 31.3200 -97.3300 251.000 30.0 94.411 3.750 -999.990 -999.990 0.944 ..P WKT 2010 08 14 17 44 55 31.3200 -97.3300 251.000 122.0 102.540 3.600 -999.990 -999.990 1.025 ..P WKT 2010 08 14 17 49 55 31.3200 -97.3300 251.000 457.0 97.004 3.930 -999.990 -999.990 0.970 ..P WKT 2010 08 14 17 54 55 31.3200 -97.3300 251.000 30.0 97.882 4.110 -999.990 -999.990 0.979 ..P WKT 2010 08 14 17 59 55 31.3200 -97.3300 251.000 122.0 99.597 4.090 -999.990 -999.990 0.996 ..P WKT 2010 08 14 18 04 55 31.3200 -97.3300 251.000 457.0 100.196 3.870 -999.990 -999.990 1.002 ..P WKT 2010 08 14 18 14 55 31.3200 -97.3300 251.000 30.0 103.107 3.810 -999.990 -999.990 1.031 ..P WKT 2010 08 14 18 19 55 31.3200 -97.3300 251.000 122.0 101.516 3.840 -999.990 -999.990 1.015 ..P WKT 2010 08 14 18 24 55 31.3200 -97.3300 251.000 457.0 91.560 4.120 -999.990 -999.990 0.916 ..P WKT 2010 08 14 18 29 55 31.3200 -97.3300 251.000 30.0 99.727 4.000 -999.990 -999.990 0.997 ..P WKT 2010 08 14 18 34 55 31.3200 -97.3300 251.000 122.0 105.384 4.220 -999.990 -999.990 1.054 ..P WKT 2010 08 14 18 39 55 31.3200 -97.3300 251.000 457.0 101.283 4.630 -999.990 -999.990 1.013 ..P WKT 2010 08 14 18 49 55 31.3200 -97.3300 251.000 30.0 102.800 3.520 -999.990 -999.990 1.028 ..P WKT 2010 08 14 18 54 55 31.3200 -97.3300 251.000 122.0 107.302 3.450 -999.990 -999.990 1.073 ..P WKT 2010 08 14 18 59 55 31.3200 -97.3300 251.000 457.0 92.011 4.990 -999.990 -999.990 0.920 ..P WKT 2010 08 14 19 04 55 31.3200 -97.3300 251.000 30.0 97.350 3.120 -999.990 -999.990 0.973 ..P WKT 2010 08 14 19 09 55 31.3200 -97.3300 251.000 122.0 103.524 2.270 -999.990 -999.990 1.035 ..P WKT 2010 08 14 19 14 55 31.3200 -97.3300 251.000 457.0 96.039 3.660 -999.990 -999.990 0.960 ..P WKT 2010 08 14 19 24 55 31.3200 -97.3300 251.000 30.0 96.561 2.030 -999.990 -999.990 0.966 ..P WKT 2010 08 14 19 29 55 31.3200 -97.3300 251.000 122.0 109.164 3.360 -999.990 -999.990 1.092 ..P WKT 2010 08 14 19 34 55 31.3200 -97.3300 251.000 457.0 100.168 2.550 -999.990 -999.990 1.002 ..P WKT 2010 08 14 19 39 55 31.3200 -97.3300 251.000 30.0 101.762 3.010 -999.990 -999.990 1.018 ..P WKT 2010 08 14 19 44 55 31.3200 -97.3300 251.000 122.0 110.602 2.970 -999.990 -999.990 1.106 ..P WKT 2010 08 14 19 49 55 31.3200 -97.3300 251.000 457.0 107.737 2.350 -999.990 -999.990 1.077 ..P WKT 2010 08 14 19 59 55 31.3200 -97.3300 251.000 30.0 102.843 2.550 -999.990 -999.990 1.028 ..P WKT 2010 08 14 20 04 55 31.3200 -97.3300 251.000 122.0 115.723 2.680 -999.990 -999.990 1.157 ..P WKT 2010 08 14 20 09 55 31.3200 -97.3300 251.000 457.0 104.916 2.740 -999.990 -999.990 1.049 ..P WKT 2010 08 14 20 14 55 31.3200 -97.3300 251.000 30.0 97.872 2.670 -999.990 -999.990 0.979 ..P WKT 2010 08 14 20 19 55 31.3200 -97.3300 251.000 122.0 114.930 4.790 -999.990 -999.990 1.149 ..P WKT 2010 08 14 20 24 55 31.3200 -97.3300 251.000 457.0 104.543 4.220 -999.990 -999.990 1.045 ..P WKT 2010 08 14 20 34 55 31.3200 -97.3300 251.000 30.0 102.874 2.740 -999.990 -999.990 1.029 ..P WKT 2010 08 14 20 39 55 31.3200 -97.3300 251.000 122.0 110.896 3.500 -999.990 -999.990 1.109 ..P WKT 2010 08 14 20 44 55 31.3200 -97.3300 251.000 457.0 101.783 2.590 -999.990 -999.990 1.018 ..P WKT 2010 08 14 20 49 55 31.3200 -97.3300 251.000 30.0 101.586 3.080 -999.990 -999.990 1.016 ..P WKT 2010 08 14 20 54 55 31.3200 -97.3300 251.000 122.0 109.746 2.410 -999.990 -999.990 1.097 ..P WKT 2010 08 14 20 59 55 31.3200 -97.3300 251.000 457.0 106.344 2.770 -999.990 -999.990 1.063 ..P WKT 2010 08 14 21 09 55 31.3200 -97.3300 251.000 30.0 103.483 3.620 -999.990 -999.990 1.035 ..P WKT 2010 08 14 21 14 55 31.3200 -97.3300 251.000 122.0 112.518 3.400 -999.990 -999.990 1.125 ..P WKT 2010 08 14 21 19 55 31.3200 -97.3300 251.000 457.0 103.446 2.850 -999.990 -999.990 1.034 ..P WKT 2010 08 14 21 24 55 31.3200 -97.3300 251.000 30.0 108.581 2.350 -999.990 -999.990 1.086 ..P WKT 2010 08 14 21 29 55 31.3200 -97.3300 251.000 122.0 112.601 2.980 -999.990 -999.990 1.126 ..P WKT 2010 08 14 21 34 55 31.3200 -97.3300 251.000 457.0 104.087 3.480 -999.990 -999.990 1.041 ..P WKT 2010 08 14 21 44 55 31.3200 -97.3300 251.000 30.0 109.343 3.010 -999.990 -999.990 1.093 ..P WKT 2010 08 14 21 49 55 31.3200 -97.3300 251.000 122.0 115.590 2.650 -999.990 -999.990 1.156 ..P WKT 2010 08 14 21 54 55 31.3200 -97.3300 251.000 457.0 104.850 2.290 -999.990 -999.990 1.048 ..P WKT 2010 08 14 21 59 55 31.3200 -97.3300 251.000 30.0 102.743 3.340 -999.990 -999.990 1.027 ..P WKT 2010 08 14 22 04 55 31.3200 -97.3300 251.000 122.0 111.218 3.380 -999.990 -999.990 1.112 ..P WKT 2010 08 14 22 09 55 31.3200 -97.3300 251.000 457.0 109.946 3.250 -999.990 -999.990 1.099 ..P WKT 2010 08 14 22 19 55 31.3200 -97.3300 251.000 30.0 108.517 2.670 -999.990 -999.990 1.085 ..P WKT 2010 08 14 22 24 55 31.3200 -97.3300 251.000 122.0 114.207 3.410 -999.990 -999.990 1.142 ..P WKT 2010 08 14 22 29 55 31.3200 -97.3300 251.000 457.0 109.037 2.740 -999.990 -999.990 1.090 ..P WKT 2010 08 14 22 34 55 31.3200 -97.3300 251.000 30.0 96.629 3.040 -999.990 -999.990 0.966 ..P WKT 2010 08 14 22 39 55 31.3200 -97.3300 251.000 122.0 104.824 2.680 -999.990 -999.990 1.048 ..P WKT 2010 08 14 22 44 55 31.3200 -97.3300 251.000 457.0 102.161 3.070 -999.990 -999.990 1.022 ..P WKT 2010 08 14 22 54 55 31.3200 -97.3300 251.000 30.0 97.134 2.990 -999.990 -999.990 0.971 ..P WKT 2010 08 14 22 59 55 31.3200 -97.3300 251.000 122.0 107.018 3.570 -999.990 -999.990 1.070 ..P WKT 2010 08 14 23 04 55 31.3200 -97.3300 251.000 457.0 96.580 2.830 -999.990 -999.990 0.966 ..P WKT 2010 08 14 23 09 55 31.3200 -97.3300 251.000 30.0 93.381 2.610 -999.990 -999.990 0.934 ..P WKT 2010 08 14 23 14 55 31.3200 -97.3300 251.000 122.0 103.265 4.310 -999.990 -999.990 1.033 ..P WKT 2010 08 14 23 19 55 31.3200 -97.3300 251.000 457.0 100.622 2.730 -999.990 -999.990 1.006 ..P WKT 2010 08 14 23 29 55 31.3200 -97.3300 251.000 30.0 89.979 4.180 -999.990 -999.990 0.900 ..P WKT 2010 08 14 23 34 55 31.3200 -97.3300 251.000 122.0 105.219 2.430 -999.990 -999.990 1.052 ..P WKT 2010 08 14 23 39 55 31.3200 -97.3300 251.000 457.0 93.323 2.790 -999.990 -999.990 0.933 ..P WKT 2010 08 14 23 44 55 31.3200 -97.3300 251.000 30.0 92.560 3.590 -999.990 -999.990 0.926 ..P WKT 2010 08 14 23 49 55 31.3200 -97.3300 251.000 122.0 108.912 2.530 -999.990 -999.990 1.089 ..P WKT 2010 08 15 00 09 55 31.3200 -97.3300 251.000 457.0 95.605 2.290 -999.990 -999.990 0.956 ..P WKT 2010 08 15 00 10 25 31.3200 -97.3300 251.000 457.0 96.260 2.300 -999.990 -999.990 0.963 ..P WKT 2010 08 15 00 10 55 31.3200 -97.3300 251.000 457.0 93.854 2.400 -999.990 -999.990 0.939 ..P WKT 2010 08 15 00 11 25 31.3200 -97.3300 251.000 457.0 95.623 3.640 -999.990 -999.990 0.956 ..P WKT 2010 08 15 00 11 55 31.3200 -97.3300 251.000 457.0 95.721 2.690 -999.990 -999.990 0.957 ..P WKT 2010 08 15 00 12 25 31.3200 -97.3300 251.000 457.0 98.882 2.400 -999.990 -999.990 0.989 ..P WKT 2010 08 15 00 12 55 31.3200 -97.3300 251.000 457.0 93.554 3.490 -999.990 -999.990 0.936 ..P WKT 2010 08 15 00 13 25 31.3200 -97.3300 251.000 457.0 95.740 3.190 -999.990 -999.990 0.957 ..P WKT 2010 08 15 00 13 55 31.3200 -97.3300 251.000 457.0 100.152 2.450 -999.990 -999.990 1.002 ..P WKT 2010 08 15 00 14 25 31.3200 -97.3300 251.000 457.0 99.972 2.890 -999.990 -999.990 1.000 ..P WKT 2010 08 15 00 14 55 31.3200 -97.3300 251.000 457.0 96.871 2.660 -999.990 -999.990 0.969 ..P WKT 2010 08 15 00 19 55 31.3200 -97.3300 251.000 30.0 96.049 2.940 -999.990 -999.990 0.960 ..P WKT 2010 08 15 00 24 55 31.3200 -97.3300 251.000 122.0 111.507 3.770 -999.990 -999.990 1.115 ..P WKT 2010 08 15 00 29 55 31.3200 -97.3300 251.000 457.0 100.390 4.410 -999.990 -999.990 1.004 ..P WKT 2010 08 15 00 34 55 31.3200 -97.3300 251.000 30.0 98.316 4.540 -999.990 -999.990 0.983 ..P WKT 2010 08 15 00 39 55 31.3200 -97.3300 251.000 122.0 105.286 3.490 -999.990 -999.990 1.053 ..P WKT 2010 08 15 00 44 55 31.3200 -97.3300 251.000 457.0 107.246 2.800 -999.990 -999.990 1.072 ..P WKT 2010 08 15 00 54 55 31.3200 -97.3300 251.000 30.0 95.855 3.020 -999.990 -999.990 0.959 ..P WKT 2010 08 15 00 59 55 31.3200 -97.3300 251.000 122.0 100.865 3.830 -999.990 -999.990 1.009 ..P WKT 2010 08 15 01 04 55 31.3200 -97.3300 251.000 457.0 94.886 4.520 -999.990 -999.990 0.949 ..P WKT 2010 08 15 01 09 55 31.3200 -97.3300 251.000 30.0 104.904 3.640 -999.990 -999.990 1.049 ..P WKT 2010 08 15 01 14 55 31.3200 -97.3300 251.000 122.0 106.993 4.450 -999.990 -999.990 1.070 ..P WKT 2010 08 15 01 19 55 31.3200 -97.3300 251.000 457.0 96.563 3.820 -999.990 -999.990 0.966 ..P WKT 2010 08 15 01 29 55 31.3200 -97.3300 251.000 30.0 102.648 4.420 -999.990 -999.990 1.026 ..P WKT 2010 08 15 01 34 55 31.3200 -97.3300 251.000 122.0 111.929 3.800 -999.990 -999.990 1.119 ..P WKT 2010 08 15 01 39 55 31.3200 -97.3300 251.000 457.0 97.845 3.250 -999.990 -999.990 0.978 ..P WKT 2010 08 15 01 44 55 31.3200 -97.3300 251.000 30.0 108.516 4.180 -999.990 -999.990 1.085 ..P WKT 2010 08 15 01 49 55 31.3200 -97.3300 251.000 122.0 107.227 3.340 -999.990 -999.990 1.072 ..P WKT 2010 08 15 01 54 55 31.3200 -97.3300 251.000 457.0 93.979 3.200 -999.990 -999.990 0.940 ..P WKT 2010 08 15 02 04 55 31.3200 -97.3300 251.000 30.0 103.082 4.920 -999.990 -999.990 1.031 ..P WKT 2010 08 15 02 09 55 31.3200 -97.3300 251.000 122.0 107.355 3.060 -999.990 -999.990 1.074 ..P WKT 2010 08 15 02 14 55 31.3200 -97.3300 251.000 457.0 92.718 3.520 -999.990 -999.990 0.927 ..P WKT 2010 08 15 02 19 55 31.3200 -97.3300 251.000 30.0 91.985 3.230 -999.990 -999.990 0.920 ..P WKT 2010 08 15 02 24 55 31.3200 -97.3300 251.000 122.0 116.280 4.260 -999.990 -999.990 1.163 ..P WKT 2010 08 15 02 29 55 31.3200 -97.3300 251.000 457.0 103.312 2.640 -999.990 -999.990 1.033 ..P WKT 2010 08 15 02 39 55 31.3200 -97.3300 251.000 30.0 107.130 2.820 -999.990 -999.990 1.071 ..P WKT 2010 08 15 02 44 55 31.3200 -97.3300 251.000 122.0 109.734 2.520 -999.990 -999.990 1.097 ..P WKT 2010 08 15 02 49 55 31.3200 -97.3300 251.000 457.0 100.938 2.430 -999.990 -999.990 1.009 ..P WKT 2010 08 15 02 54 55 31.3200 -97.3300 251.000 30.0 104.376 2.470 -999.990 -999.990 1.044 ..P WKT 2010 08 15 02 59 55 31.3200 -97.3300 251.000 122.0 103.088 2.550 -999.990 -999.990 1.031 ..P WKT 2010 08 15 03 04 55 31.3200 -97.3300 251.000 457.0 96.239 3.070 -999.990 -999.990 0.962 ..P WKT 2010 08 15 03 14 55 31.3200 -97.3300 251.000 30.0 107.623 2.620 -999.990 -999.990 1.076 ..P WKT 2010 08 15 03 19 55 31.3200 -97.3300 251.000 122.0 108.339 2.950 -999.990 -999.990 1.083 ..P WKT 2010 08 15 03 24 55 31.3200 -97.3300 251.000 457.0 99.327 2.880 -999.990 -999.990 0.993 ..P WKT 2010 08 15 03 29 55 31.3200 -97.3300 251.000 30.0 107.828 3.820 -999.990 -999.990 1.078 ..P WKT 2010 08 15 03 34 55 31.3200 -97.3300 251.000 122.0 108.962 3.430 -999.990 -999.990 1.090 ..P WKT 2010 08 15 03 39 55 31.3200 -97.3300 251.000 457.0 99.255 4.110 -999.990 -999.990 0.993 ..P WKT 2010 08 15 03 49 55 31.3200 -97.3300 251.000 30.0 109.286 4.800 -999.990 -999.990 1.093 ..P WKT 2010 08 15 03 54 55 31.3200 -97.3300 251.000 122.0 104.285 5.160 -999.990 -999.990 1.043 ..P WKT 2010 08 15 03 59 55 31.3200 -97.3300 251.000 457.0 99.285 3.530 -999.990 -999.990 0.993 ..P WKT 2010 08 15 04 04 55 31.3200 -97.3300 251.000 30.0 106.097 4.170 -999.990 -999.990 1.061 ..P WKT 2010 08 15 04 09 55 31.3200 -97.3300 251.000 122.0 105.404 3.620 -999.990 -999.990 1.054 ..P WKT 2010 08 15 04 14 55 31.3200 -97.3300 251.000 457.0 102.766 2.870 -999.990 -999.990 1.028 ..P WKT 2010 08 15 04 24 55 31.3200 -97.3300 251.000 30.0 104.101 3.180 -999.990 -999.990 1.041 ..P WKT 2010 08 15 04 29 55 31.3200 -97.3300 251.000 122.0 110.296 4.060 -999.990 -999.990 1.103 ..P WKT 2010 08 15 04 34 55 31.3200 -97.3300 251.000 457.0 97.735 4.340 -999.990 -999.990 0.977 ..P WKT 2010 08 15 04 39 55 31.3200 -97.3300 251.000 30.0 96.705 3.940 -999.990 -999.990 0.967 ..P WKT 2010 08 15 04 44 55 31.3200 -97.3300 251.000 122.0 106.929 3.500 -999.990 -999.990 1.069 ..P WKT 2010 08 15 04 49 55 31.3200 -97.3300 251.000 457.0 96.730 3.160 -999.990 -999.990 0.967 ..P WKT 2010 08 15 05 04 55 31.3200 -97.3300 251.000 30.0 94.624 4.010 -999.990 -999.990 0.946 ..P WKT 2010 08 15 05 09 55 31.3200 -97.3300 251.000 122.0 99.851 4.550 -999.990 -999.990 0.999 ..P WKT 2010 08 15 05 14 55 31.3200 -97.3300 251.000 457.0 98.271 3.830 -999.990 -999.990 0.983 ..P WKT 2010 08 15 05 19 55 31.3200 -97.3300 251.000 30.0 96.413 2.810 -999.990 -999.990 0.964 ..P WKT 2010 08 15 05 24 55 31.3200 -97.3300 251.000 122.0 105.389 3.500 -999.990 -999.990 1.054 ..P WKT 2010 08 15 05 29 55 31.3200 -97.3300 251.000 457.0 96.587 3.290 -999.990 -999.990 0.966 ..P WKT 2010 08 15 05 39 55 31.3200 -97.3300 251.000 30.0 102.966 2.680 -999.990 -999.990 1.030 ..P WKT 2010 08 15 05 44 55 31.3200 -97.3300 251.000 122.0 105.647 3.220 -999.990 -999.990 1.056 ..P WKT 2010 08 15 05 49 55 31.3200 -97.3300 251.000 457.0 96.106 3.710 -999.990 -999.990 0.961 ..P WKT 2010 08 15 05 54 55 31.3200 -97.3300 251.000 30.0 105.175 3.250 -999.990 -999.990 1.052 ..P WKT 2010 08 15 05 59 55 31.3200 -97.3300 251.000 122.0 101.468 4.020 -999.990 -999.990 1.015 ..P WKT 2010 08 15 06 04 55 31.3200 -97.3300 251.000 457.0 93.594 3.620 -999.990 -999.990 0.936 ..P WKT 2010 08 15 06 14 55 31.3200 -97.3300 251.000 30.0 96.734 4.030 -999.990 -999.990 0.967 ..P WKT 2010 08 15 06 19 55 31.3200 -97.3300 251.000 122.0 96.082 3.590 -999.990 -999.990 0.961 ..P WKT 2010 08 15 06 24 55 31.3200 -97.3300 251.000 457.0 85.710 6.070 -999.990 -999.990 0.857 ..P WKT 2010 08 15 06 29 55 31.3200 -97.3300 251.000 30.0 88.669 4.490 -999.990 -999.990 0.887 ..P WKT 2010 08 15 06 34 55 31.3200 -97.3300 251.000 122.0 99.957 3.360 -999.990 -999.990 1.000 ..P WKT 2010 08 15 06 39 55 31.3200 -97.3300 251.000 457.0 80.145 3.140 -999.990 -999.990 0.801 ..P WKT 2010 08 15 06 49 55 31.3200 -97.3300 251.000 30.0 96.157 3.210 -999.990 -999.990 0.962 ..P WKT 2010 08 15 06 54 55 31.3200 -97.3300 251.000 122.0 108.377 3.380 -999.990 -999.990 1.084 ..P WKT 2010 08 15 06 59 55 31.3200 -97.3300 251.000 457.0 91.997 3.800 -999.990 -999.990 0.920 ..P WKT 2010 08 15 07 04 55 31.3200 -97.3300 251.000 30.0 99.774 4.180 -999.990 -999.990 0.998 ..P WKT 2010 08 15 07 09 55 31.3200 -97.3300 251.000 122.0 95.334 4.080 -999.990 -999.990 0.953 ..P WKT 2010 08 15 07 14 55 31.3200 -97.3300 251.000 457.0 91.034 4.560 -999.990 -999.990 0.910 ..P WKT 2010 08 15 07 24 55 31.3200 -97.3300 251.000 30.0 96.175 3.990 -999.990 -999.990 0.962 ..P WKT 2010 08 15 07 29 55 31.3200 -97.3300 251.000 122.0 97.843 3.820 -999.990 -999.990 0.978 ..P WKT 2010 08 15 07 34 55 31.3200 -97.3300 251.000 457.0 86.743 4.280 -999.990 -999.990 0.867 ..P WKT 2010 08 15 07 39 55 31.3200 -97.3300 251.000 30.0 87.439 5.780 -999.990 -999.990 0.874 ..P WKT 2010 08 15 07 44 55 31.3200 -97.3300 251.000 122.0 98.823 4.360 -999.990 -999.990 0.988 ..P WKT 2010 08 15 07 49 55 31.3200 -97.3300 251.000 457.0 86.196 3.780 -999.990 -999.990 0.862 ..P WKT 2010 08 15 07 59 55 31.3200 -97.3300 251.000 30.0 95.341 3.680 -999.990 -999.990 0.953 ..P WKT 2010 08 15 08 04 55 31.3200 -97.3300 251.000 122.0 101.847 4.390 -999.990 -999.990 1.018 ..P WKT 2010 08 15 08 09 55 31.3200 -97.3300 251.000 457.0 81.985 5.710 -999.990 -999.990 0.820 ..P WKT 2010 08 15 08 14 55 31.3200 -97.3300 251.000 30.0 89.462 5.440 -999.990 -999.990 0.895 ..P WKT 2010 08 15 08 19 55 31.3200 -97.3300 251.000 122.0 101.378 3.540 -999.990 -999.990 1.014 ..P WKT 2010 08 15 08 24 55 31.3200 -97.3300 251.000 457.0 90.538 3.520 -999.990 -999.990 0.905 ..P WKT 2010 08 15 08 34 55 31.3200 -97.3300 251.000 30.0 100.513 4.650 -999.990 -999.990 1.005 ..P WKT 2010 08 15 08 39 55 31.3200 -97.3300 251.000 122.0 99.684 3.490 -999.990 -999.990 0.997 ..P WKT 2010 08 15 08 44 55 31.3200 -97.3300 251.000 457.0 86.645 3.550 -999.990 -999.990 0.866 ..P WKT 2010 08 15 08 49 55 31.3200 -97.3300 251.000 30.0 94.694 3.720 -999.990 -999.990 0.947 ..P WKT 2010 08 15 08 54 55 31.3200 -97.3300 251.000 122.0 103.714 3.460 -999.990 -999.990 1.037 ..P WKT 2010 08 15 08 59 55 31.3200 -97.3300 251.000 457.0 97.196 3.790 -999.990 -999.990 0.972 ..P WKT 2010 08 15 09 09 55 31.3200 -97.3300 251.000 30.0 91.435 4.220 -999.990 -999.990 0.914 ..P WKT 2010 08 15 09 14 55 31.3200 -97.3300 251.000 122.0 96.907 3.500 -999.990 -999.990 0.969 ..P WKT 2010 08 15 09 19 55 31.3200 -97.3300 251.000 457.0 96.692 3.990 -999.990 -999.990 0.967 ..P WKT 2010 08 15 09 24 55 31.3200 -97.3300 251.000 30.0 98.140 3.830 -999.990 -999.990 0.981 ..P WKT 2010 08 15 09 29 55 31.3200 -97.3300 251.000 122.0 102.086 4.000 -999.990 -999.990 1.021 ..P WKT 2010 08 15 09 34 55 31.3200 -97.3300 251.000 457.0 83.284 3.580 -999.990 -999.990 0.833 ..P WKT 2010 08 15 09 44 55 31.3200 -97.3300 251.000 30.0 94.188 4.530 -999.990 -999.990 0.942 ..P WKT 2010 08 15 09 49 55 31.3200 -97.3300 251.000 122.0 101.423 4.210 -999.990 -999.990 1.014 ..P WKT 2010 08 15 09 54 55 31.3200 -97.3300 251.000 457.0 83.693 4.150 -999.990 -999.990 0.837 ..P WKT 2010 08 15 09 59 55 31.3200 -97.3300 251.000 30.0 95.642 4.160 -999.990 -999.990 0.956 ..P WKT 2010 08 15 10 04 55 31.3200 -97.3300 251.000 122.0 101.212 4.390 -999.990 -999.990 1.012 ..P WKT 2010 08 15 10 09 55 31.3200 -97.3300 251.000 457.0 81.266 4.340 -999.990 -999.990 0.813 ..P WKT 2010 08 15 10 19 55 31.3200 -97.3300 251.000 30.0 101.160 4.780 -999.990 -999.990 1.012 ..P WKT 2010 08 15 10 24 55 31.3200 -97.3300 251.000 122.0 109.106 4.120 -999.990 -999.990 1.091 ..P WKT 2010 08 15 10 29 55 31.3200 -97.3300 251.000 457.0 89.320 4.440 -999.990 -999.990 0.893 ..P WKT 2010 08 15 10 34 55 31.3200 -97.3300 251.000 30.0 105.030 4.510 -999.990 -999.990 1.050 ..P WKT 2010 08 15 10 39 55 31.3200 -97.3300 251.000 122.0 104.656 4.000 -999.990 -999.990 1.047 ..P WKT 2010 08 15 10 44 55 31.3200 -97.3300 251.000 457.0 83.208 3.850 -999.990 -999.990 0.832 ..P WKT 2010 08 15 10 54 55 31.3200 -97.3300 251.000 30.0 105.535 3.690 -999.990 -999.990 1.055 ..P WKT 2010 08 15 10 59 55 31.3200 -97.3300 251.000 122.0 99.398 3.370 -999.990 -999.990 0.994 ..P WKT 2010 08 15 11 04 55 31.3200 -97.3300 251.000 457.0 79.398 3.970 -999.990 -999.990 0.794 ..P WKT 2010 08 15 11 09 55 31.3200 -97.3300 251.000 30.0 96.967 3.630 -999.990 -999.990 0.970 ..P WKT 2010 08 15 11 14 55 31.3200 -97.3300 251.000 122.0 94.712 3.420 -999.990 -999.990 0.947 ..P WKT 2010 08 15 11 19 55 31.3200 -97.3300 251.000 457.0 75.546 3.940 -999.990 -999.990 0.755 ..P WKT 2010 08 15 11 29 55 31.3200 -97.3300 251.000 30.0 103.631 4.330 -999.990 -999.990 1.036 ..P WKT 2010 08 15 11 34 55 31.3200 -97.3300 251.000 122.0 100.841 3.950 -999.990 -999.990 1.008 ..P WKT 2010 08 15 11 39 55 31.3200 -97.3300 251.000 457.0 78.649 4.330 -999.990 -999.990 0.786 ..P WKT 2010 08 15 11 44 55 31.3200 -97.3300 251.000 30.0 102.193 4.740 -999.990 -999.990 1.022 ..P WKT 2010 08 15 11 49 55 31.3200 -97.3300 251.000 122.0 93.583 3.680 -999.990 -999.990 0.936 ..P WKT 2010 08 15 12 09 55 31.3200 -97.3300 251.000 457.0 76.384 6.040 -999.990 -999.990 0.764 ..P WKT 2010 08 15 12 10 25 31.3200 -97.3300 251.000 457.0 77.203 6.710 -999.990 -999.990 0.772 ..P WKT 2010 08 15 12 10 55 31.3200 -97.3300 251.000 457.0 74.144 6.070 -999.990 -999.990 0.741 ..P WKT 2010 08 15 12 11 25 31.3200 -97.3300 251.000 457.0 80.227 5.020 -999.990 -999.990 0.802 ..P WKT 2010 08 15 12 11 55 31.3200 -97.3300 251.000 457.0 75.367 3.930 -999.990 -999.990 0.754 ..P WKT 2010 08 15 12 12 25 31.3200 -97.3300 251.000 457.0 75.771 3.800 -999.990 -999.990 0.758 ..P WKT 2010 08 15 12 12 55 31.3200 -97.3300 251.000 457.0 72.850 4.090 -999.990 -999.990 0.728 ..P WKT 2010 08 15 12 13 25 31.3200 -97.3300 251.000 457.0 75.332 4.760 -999.990 -999.990 0.753 ..P WKT 2010 08 15 12 13 55 31.3200 -97.3300 251.000 457.0 81.969 4.230 -999.990 -999.990 0.820 ..P WKT 2010 08 15 12 14 25 31.3200 -97.3300 251.000 457.0 77.108 4.020 -999.990 -999.990 0.771 ..P WKT 2010 08 15 12 14 55 31.3200 -97.3300 251.000 457.0 73.357 4.010 -999.990 -999.990 0.734 ..P WKT 2010 08 15 12 19 55 31.3200 -97.3300 251.000 30.0 100.522 5.680 -999.990 -999.990 1.005 ..P WKT 2010 08 15 12 24 55 31.3200 -97.3300 251.000 122.0 93.060 4.640 -999.990 -999.990 0.931 ..P WKT 2010 08 15 12 29 55 31.3200 -97.3300 251.000 457.0 90.724 3.750 -999.990 -999.990 0.907 ..P WKT 2010 08 15 12 34 55 31.3200 -97.3300 251.000 30.0 99.324 4.590 -999.990 -999.990 0.993 ..P WKT 2010 08 15 12 39 55 31.3200 -97.3300 251.000 122.0 99.894 3.960 -999.990 -999.990 0.999 ..P WKT 2010 08 15 12 44 55 31.3200 -97.3300 251.000 457.0 87.456 3.850 -999.990 -999.990 0.875 ..P WKT 2010 08 15 12 54 55 31.3200 -97.3300 251.000 30.0 103.962 3.820 -999.990 -999.990 1.040 ..P WKT 2010 08 15 12 59 55 31.3200 -97.3300 251.000 122.0 97.348 4.210 -999.990 -999.990 0.973 ..P WKT 2010 08 15 13 04 55 31.3200 -97.3300 251.000 457.0 89.491 4.560 -999.990 -999.990 0.895 ..P WKT 2010 08 15 13 09 55 31.3200 -97.3300 251.000 30.0 100.579 3.780 -999.990 -999.990 1.006 ..P WKT 2010 08 15 13 14 55 31.3200 -97.3300 251.000 122.0 98.668 4.080 -999.990 -999.990 0.987 ..P WKT 2010 08 15 13 19 55 31.3200 -97.3300 251.000 457.0 94.270 4.490 -999.990 -999.990 0.943 ..P WKT 2010 08 15 13 29 55 31.3200 -97.3300 251.000 30.0 105.178 4.030 -999.990 -999.990 1.052 ..P WKT 2010 08 15 13 34 55 31.3200 -97.3300 251.000 122.0 106.111 4.060 -999.990 -999.990 1.061 ..P WKT 2010 08 15 13 39 55 31.3200 -97.3300 251.000 457.0 94.334 4.690 -999.990 -999.990 0.943 ..P WKT 2010 08 15 13 44 55 31.3200 -97.3300 251.000 30.0 93.886 4.620 -999.990 -999.990 0.939 ..P WKT 2010 08 15 13 49 55 31.3200 -97.3300 251.000 122.0 106.695 4.300 -999.990 -999.990 1.067 ..P WKT 2010 08 15 13 54 55 31.3200 -97.3300 251.000 457.0 91.886 4.150 -999.990 -999.990 0.919 ..P WKT 2010 08 15 14 04 55 31.3200 -97.3300 251.000 30.0 89.061 4.020 -999.990 -999.990 0.891 ..P WKT 2010 08 15 14 09 55 31.3200 -97.3300 251.000 122.0 99.654 4.090 -999.990 -999.990 0.997 ..P WKT 2010 08 15 14 14 55 31.3200 -97.3300 251.000 457.0 86.236 4.670 -999.990 -999.990 0.862 ..P WKT 2010 08 15 14 19 55 31.3200 -97.3300 251.000 30.0 87.722 3.820 -999.990 -999.990 0.877 ..P WKT 2010 08 15 14 24 55 31.3200 -97.3300 251.000 122.0 97.758 3.800 -999.990 -999.990 0.978 ..P WKT 2010 08 15 14 29 55 31.3200 -97.3300 251.000 457.0 92.070 4.070 -999.990 -999.990 0.921 ..P WKT 2010 08 15 14 39 55 31.3200 -97.3300 251.000 30.0 93.895 3.850 -999.990 -999.990 0.939 ..P WKT 2010 08 15 14 44 55 31.3200 -97.3300 251.000 122.0 100.853 4.270 -999.990 -999.990 1.009 ..P WKT 2010 08 15 14 49 55 31.3200 -97.3300 251.000 457.0 95.680 3.790 -999.990 -999.990 0.957 ..P WKT 2010 08 15 14 54 55 31.3200 -97.3300 251.000 30.0 87.752 4.380 -999.990 -999.990 0.878 ..P WKT 2010 08 15 14 59 55 31.3200 -97.3300 251.000 122.0 98.840 4.280 -999.990 -999.990 0.988 ..P WKT 2010 08 15 15 04 55 31.3200 -97.3300 251.000 457.0 91.328 4.430 -999.990 -999.990 0.913 ..P WKT 2010 08 15 15 14 55 31.3200 -97.3300 251.000 30.0 101.197 4.280 -999.990 -999.990 1.012 ..P WKT 2010 08 15 15 19 55 31.3200 -97.3300 251.000 122.0 101.910 4.200 -999.990 -999.990 1.019 ..P WKT 2010 08 15 15 24 55 31.3200 -97.3300 251.000 457.0 95.327 4.350 -999.990 -999.990 0.953 ..P WKT 2010 08 15 15 29 55 31.3200 -97.3300 251.000 30.0 94.389 4.480 -999.990 -999.990 0.944 ..P WKT 2010 08 15 15 34 55 31.3200 -97.3300 251.000 122.0 102.672 4.350 -999.990 -999.990 1.027 ..P WKT 2010 08 15 15 39 55 31.3200 -97.3300 251.000 457.0 91.826 4.070 -999.990 -999.990 0.918 ..P WKT 2010 08 15 15 49 55 31.3200 -97.3300 251.000 30.0 94.000 4.470 -999.990 -999.990 0.940 ..P WKT 2010 08 15 15 54 55 31.3200 -97.3300 251.000 122.0 99.586 4.460 -999.990 -999.990 0.996 ..P WKT 2010 08 15 15 59 55 31.3200 -97.3300 251.000 457.0 91.145 5.530 -999.990 -999.990 0.911 ..P WKT 2010 08 15 16 04 55 31.3200 -97.3300 251.000 30.0 91.917 4.920 -999.990 -999.990 0.919 ..P WKT 2010 08 15 16 09 55 31.3200 -97.3300 251.000 122.0 102.586 5.230 -999.990 -999.990 1.026 ..P WKT 2010 08 15 16 14 55 31.3200 -97.3300 251.000 457.0 95.935 5.830 -999.990 -999.990 0.959 ..P WKT 2010 08 15 16 24 55 31.3200 -97.3300 251.000 30.0 93.965 5.440 -999.990 -999.990 0.940 ..P WKT 2010 08 15 16 29 55 31.3200 -97.3300 251.000 122.0 100.153 5.530 -999.990 -999.990 1.002 ..P WKT 2010 08 15 16 34 55 31.3200 -97.3300 251.000 457.0 93.977 5.210 -999.990 -999.990 0.940 ..P WKT 2010 08 15 16 39 55 31.3200 -97.3300 251.000 30.0 96.867 5.110 -999.990 -999.990 0.969 ..P WKT 2010 08 15 16 44 55 31.3200 -97.3300 251.000 122.0 107.995 4.670 -999.990 -999.990 1.080 ..P WKT 2010 08 15 16 49 55 31.3200 -97.3300 251.000 457.0 102.370 4.000 -999.990 -999.990 1.024 ..P WKT 2010 08 15 17 04 55 31.3200 -97.3300 251.000 30.0 93.665 4.390 -999.990 -999.990 0.937 ..P WKT 2010 08 15 17 09 55 31.3200 -97.3300 251.000 122.0 96.859 5.950 -999.990 -999.990 0.969 ..P WKT 2010 08 15 17 14 55 31.3200 -97.3300 251.000 457.0 90.175 5.080 -999.990 -999.990 0.902 ..P WKT 2010 08 15 17 19 55 31.3200 -97.3300 251.000 30.0 87.060 4.890 -999.990 -999.990 0.871 ..P WKT 2010 08 15 17 24 55 31.3200 -97.3300 251.000 122.0 97.658 4.530 -999.990 -999.990 0.977 ..P WKT 2010 08 15 17 29 55 31.3200 -97.3300 251.000 457.0 104.139 4.780 -999.990 -999.990 1.041 ..P WKT 2010 08 15 17 39 55 31.3200 -97.3300 251.000 30.0 92.940 4.790 -999.990 -999.990 0.929 ..P WKT 2010 08 15 17 44 55 31.3200 -97.3300 251.000 122.0 102.402 5.260 -999.990 -999.990 1.024 ..P WKT 2010 08 15 17 49 55 31.3200 -97.3300 251.000 457.0 95.967 5.240 -999.990 -999.990 0.960 ..P WKT 2010 08 15 17 54 55 31.3200 -97.3300 251.000 30.0 100.220 7.410 -999.990 -999.990 1.002 ..P WKT 2010 08 15 17 59 55 31.3200 -97.3300 251.000 122.0 105.293 5.330 -999.990 -999.990 1.053 ..P WKT 2010 08 15 18 04 55 31.3200 -97.3300 251.000 457.0 99.135 6.870 -999.990 -999.990 0.991 ..P WKT 2010 08 15 18 14 55 31.3200 -97.3300 251.000 30.0 103.213 5.610 -999.990 -999.990 1.032 ..P WKT 2010 08 15 18 19 55 31.3200 -97.3300 251.000 122.0 111.529 4.900 -999.990 -999.990 1.115 ..P WKT 2010 08 15 18 24 55 31.3200 -97.3300 251.000 457.0 98.217 4.930 -999.990 -999.990 0.982 ..P WKT 2010 08 15 18 29 55 31.3200 -97.3300 251.000 30.0 95.310 4.770 -999.990 -999.990 0.953 ..P WKT 2010 08 15 18 34 55 31.3200 -97.3300 251.000 122.0 108.275 4.720 -999.990 -999.990 1.083 ..P WKT 2010 08 15 18 39 55 31.3200 -97.3300 251.000 457.0 98.800 5.430 -999.990 -999.990 0.988 ..P WKT 2010 08 15 18 49 55 31.3200 -97.3300 251.000 30.0 94.747 4.460 -999.990 -999.990 0.947 ..P WKT 2010 08 15 18 54 55 31.3200 -97.3300 251.000 122.0 103.992 4.130 -999.990 -999.990 1.040 ..P WKT 2010 08 15 18 59 55 31.3200 -97.3300 251.000 457.0 96.008 4.850 -999.990 -999.990 0.960 ..P WKT 2010 08 15 19 04 55 31.3200 -97.3300 251.000 30.0 95.135 3.780 -999.990 -999.990 0.951 ..P WKT 2010 08 15 19 09 55 31.3200 -97.3300 251.000 122.0 106.290 4.030 -999.990 -999.990 1.063 ..P WKT 2010 08 15 19 14 55 31.3200 -97.3300 251.000 457.0 95.030 3.640 -999.990 -999.990 0.950 ..P WKT 2010 08 15 19 24 55 31.3200 -97.3300 251.000 30.0 88.544 4.400 -999.990 -999.990 0.885 ..P WKT 2010 08 15 19 29 55 31.3200 -97.3300 251.000 122.0 99.731 4.650 -999.990 -999.990 0.997 ..P WKT 2010 08 15 19 34 55 31.3200 -97.3300 251.000 457.0 87.699 5.030 -999.990 -999.990 0.877 ..P WKT 2010 08 15 19 39 55 31.3200 -97.3300 251.000 30.0 85.776 5.490 -999.990 -999.990 0.858 ..P WKT 2010 08 15 19 44 55 31.3200 -97.3300 251.000 122.0 101.189 4.990 -999.990 -999.990 1.012 ..P WKT 2010 08 15 19 49 55 31.3200 -97.3300 251.000 457.0 89.437 5.270 -999.990 -999.990 0.894 ..P WKT 2010 08 15 19 59 55 31.3200 -97.3300 251.000 30.0 86.507 5.990 -999.990 -999.990 0.865 ..P WKT 2010 08 15 20 04 55 31.3200 -97.3300 251.000 122.0 96.687 5.730 -999.990 -999.990 0.967 ..P WKT 2010 08 15 20 09 55 31.3200 -97.3300 251.000 457.0 89.951 4.610 -999.990 -999.990 0.900 ..P WKT 2010 08 15 20 14 55 31.3200 -97.3300 251.000 30.0 85.672 4.670 -999.990 -999.990 0.857 ..P WKT 2010 08 15 20 19 55 31.3200 -97.3300 251.000 122.0 101.438 4.110 -999.990 -999.990 1.014 ..P WKT 2010 08 15 20 24 55 31.3200 -97.3300 251.000 457.0 96.613 3.930 -999.990 -999.990 0.966 ..P WKT 2010 08 15 20 34 55 31.3200 -97.3300 251.000 30.0 93.606 3.730 -999.990 -999.990 0.936 ..P WKT 2010 08 15 20 39 55 31.3200 -97.3300 251.000 122.0 109.050 4.540 -999.990 -999.990 1.091 ..P WKT 2010 08 15 20 44 55 31.3200 -97.3300 251.000 457.0 100.509 3.730 -999.990 -999.990 1.005 ..P WKT 2010 08 15 20 49 55 31.3200 -97.3300 251.000 30.0 89.927 3.890 -999.990 -999.990 0.899 ..P WKT 2010 08 15 20 54 55 31.3200 -97.3300 251.000 122.0 104.274 4.120 -999.990 -999.990 1.043 ..P WKT 2010 08 15 20 59 55 31.3200 -97.3300 251.000 457.0 99.688 3.990 -999.990 -999.990 0.997 ..P WKT 2010 08 15 21 09 55 31.3200 -97.3300 251.000 30.0 92.073 3.490 -999.990 -999.990 0.921 ..P WKT 2010 08 15 21 14 55 31.3200 -97.3300 251.000 122.0 107.695 3.690 -999.990 -999.990 1.077 ..P WKT 2010 08 15 21 19 55 31.3200 -97.3300 251.000 457.0 92.825 3.730 -999.990 -999.990 0.928 ..P WKT 2010 08 15 21 24 55 31.3200 -97.3300 251.000 30.0 88.302 3.940 -999.990 -999.990 0.883 ..P WKT 2010 08 15 21 29 55 31.3200 -97.3300 251.000 122.0 97.930 3.790 -999.990 -999.990 0.979 ..P WKT 2010 08 15 21 34 55 31.3200 -97.3300 251.000 457.0 89.598 3.440 -999.990 -999.990 0.896 ..P WKT 2010 08 15 21 44 55 31.3200 -97.3300 251.000 30.0 86.814 3.380 -999.990 -999.990 0.868 ..P WKT 2010 08 15 21 49 55 31.3200 -97.3300 251.000 122.0 100.243 3.590 -999.990 -999.990 1.002 ..P WKT 2010 08 15 21 54 55 31.3200 -97.3300 251.000 457.0 86.751 4.110 -999.990 -999.990 0.868 ..P WKT 2010 08 15 21 59 55 31.3200 -97.3300 251.000 30.0 87.671 3.370 -999.990 -999.990 0.877 ..P WKT 2010 08 15 22 04 55 31.3200 -97.3300 251.000 122.0 99.463 3.670 -999.990 -999.990 0.995 ..P WKT 2010 08 15 22 09 55 31.3200 -97.3300 251.000 457.0 88.422 3.180 -999.990 -999.990 0.884 ..P WKT 2010 08 15 22 19 55 31.3200 -97.3300 251.000 30.0 86.380 3.950 -999.990 -999.990 0.864 ..P WKT 2010 08 15 22 24 55 31.3200 -97.3300 251.000 122.0 92.925 3.330 -999.990 -999.990 0.929 ..P WKT 2010 08 15 22 29 55 31.3200 -97.3300 251.000 457.0 84.260 3.240 -999.990 -999.990 0.843 ..P WKT 2010 08 15 22 34 55 31.3200 -97.3300 251.000 30.0 83.744 3.640 -999.990 -999.990 0.837 ..P WKT 2010 08 15 22 39 55 31.3200 -97.3300 251.000 122.0 105.492 4.680 -999.990 -999.990 1.055 ..P WKT 2010 08 15 22 44 55 31.3200 -97.3300 251.000 457.0 90.856 3.690 -999.990 -999.990 0.909 ..P WKT 2010 08 15 22 54 55 31.3200 -97.3300 251.000 30.0 87.826 5.340 -999.990 -999.990 0.878 ..P WKT 2010 08 15 22 59 55 31.3200 -97.3300 251.000 122.0 102.136 3.970 -999.990 -999.990 1.021 ..P WKT 2010 08 15 23 04 55 31.3200 -97.3300 251.000 457.0 95.145 3.370 -999.990 -999.990 0.951 ..P WKT 2010 08 15 23 09 55 31.3200 -97.3300 251.000 30.0 92.497 4.030 -999.990 -999.990 0.925 ..P WKT 2010 08 15 23 14 55 31.3200 -97.3300 251.000 122.0 95.680 3.810 -999.990 -999.990 0.957 ..P WKT 2010 08 15 23 19 55 31.3200 -97.3300 251.000 457.0 96.964 4.550 -999.990 -999.990 0.970 ..P WKT 2010 08 15 23 29 55 31.3200 -97.3300 251.000 30.0 86.188 3.340 -999.990 -999.990 0.862 ..P WKT 2010 08 15 23 34 55 31.3200 -97.3300 251.000 122.0 93.511 3.500 -999.990 -999.990 0.935 ..P WKT 2010 08 15 23 39 55 31.3200 -97.3300 251.000 457.0 89.314 3.800 -999.990 -999.990 0.893 ..P WKT 2010 08 15 23 44 55 31.3200 -97.3300 251.000 30.0 89.861 3.380 -999.990 -999.990 0.899 ..P WKT 2010 08 15 23 49 55 31.3200 -97.3300 251.000 122.0 102.326 4.570 -999.990 -999.990 1.023 ..P WKT 2010 08 16 00 09 55 31.3200 -97.3300 251.000 457.0 97.130 3.620 -999.990 -999.990 0.971 ..P WKT 2010 08 16 00 10 25 31.3200 -97.3300 251.000 457.0 97.768 3.860 -999.990 -999.990 0.978 ..P WKT 2010 08 16 00 10 55 31.3200 -97.3300 251.000 457.0 96.105 4.030 -999.990 -999.990 0.961 ..P WKT 2010 08 16 00 11 25 31.3200 -97.3300 251.000 457.0 96.879 4.420 -999.990 -999.990 0.969 ..P WKT 2010 08 16 00 11 55 31.3200 -97.3300 251.000 457.0 97.247 4.060 -999.990 -999.990 0.972 ..P WKT 2010 08 16 00 12 25 31.3200 -97.3300 251.000 457.0 92.875 3.630 -999.990 -999.990 0.929 ..P WKT 2010 08 16 00 12 55 31.3200 -97.3300 251.000 457.0 92.159 3.960 -999.990 -999.990 0.922 ..P WKT 2010 08 16 00 13 25 31.3200 -97.3300 251.000 457.0 97.403 4.570 -999.990 -999.990 0.974 ..P WKT 2010 08 16 00 13 55 31.3200 -97.3300 251.000 457.0 96.416 4.140 -999.990 -999.990 0.964 ..P WKT 2010 08 16 00 14 25 31.3200 -97.3300 251.000 457.0 98.139 4.240 -999.990 -999.990 0.981 ..P WKT 2010 08 16 00 14 55 31.3200 -97.3300 251.000 457.0 91.193 3.510 -999.990 -999.990 0.912 ..P WKT 2010 08 16 00 19 55 31.3200 -97.3300 251.000 30.0 89.995 3.710 -999.990 -999.990 0.900 ..P WKT 2010 08 16 00 24 55 31.3200 -97.3300 251.000 122.0 100.584 3.550 -999.990 -999.990 1.006 ..P WKT 2010 08 16 00 29 55 31.3200 -97.3300 251.000 457.0 89.766 4.440 -999.990 -999.990 0.898 ..P WKT 2010 08 16 00 34 55 31.3200 -97.3300 251.000 30.0 86.129 3.480 -999.990 -999.990 0.861 ..P WKT 2010 08 16 00 39 55 31.3200 -97.3300 251.000 122.0 104.041 3.910 -999.990 -999.990 1.040 ..P WKT 2010 08 16 00 44 55 31.3200 -97.3300 251.000 457.0 94.576 4.780 -999.990 -999.990 0.946 ..P WKT 2010 08 16 00 54 55 31.3200 -97.3300 251.000 30.0 90.785 3.480 -999.990 -999.990 0.908 ..P WKT 2010 08 16 00 59 55 31.3200 -97.3300 251.000 122.0 99.717 3.960 -999.990 -999.990 0.997 ..P WKT 2010 08 16 01 04 55 31.3200 -97.3300 251.000 457.0 90.072 4.330 -999.990 -999.990 0.901 ..P WKT 2010 08 16 01 09 55 31.3200 -97.3300 251.000 30.0 88.020 4.860 -999.990 -999.990 0.880 ..P WKT 2010 08 16 01 14 55 31.3200 -97.3300 251.000 122.0 100.348 4.480 -999.990 -999.990 1.003 ..P WKT 2010 08 16 01 19 55 31.3200 -97.3300 251.000 457.0 94.769 3.960 -999.990 -999.990 0.948 ..P WKT 2010 08 16 01 29 55 31.3200 -97.3300 251.000 30.0 97.741 3.820 -999.990 -999.990 0.977 ..P WKT 2010 08 16 01 34 55 31.3200 -97.3300 251.000 122.0 107.923 3.780 -999.990 -999.990 1.079 ..P WKT 2010 08 16 01 39 55 31.3200 -97.3300 251.000 457.0 98.019 3.500 -999.990 -999.990 0.980 ..P WKT 2010 08 16 01 44 55 31.3200 -97.3300 251.000 30.0 111.734 5.370 -999.990 -999.990 1.117 ..P WKT 2010 08 16 01 49 55 31.3200 -97.3300 251.000 122.0 103.999 3.330 -999.990 -999.990 1.040 ..P WKT 2010 08 16 01 54 55 31.3200 -97.3300 251.000 457.0 91.374 3.190 -999.990 -999.990 0.914 ..P WKT 2010 08 16 02 04 55 31.3200 -97.3300 251.000 30.0 92.659 5.390 -999.990 -999.990 0.927 ..P WKT 2010 08 16 02 09 55 31.3200 -97.3300 251.000 122.0 92.720 3.280 -999.990 -999.990 0.927 ..P WKT 2010 08 16 02 14 55 31.3200 -97.3300 251.000 457.0 93.867 4.070 -999.990 -999.990 0.939 ..P WKT 2010 08 16 02 19 55 31.3200 -97.3300 251.000 30.0 96.646 4.920 -999.990 -999.990 0.966 ..P WKT 2010 08 16 02 24 55 31.3200 -97.3300 251.000 122.0 96.707 4.190 -999.990 -999.990 0.967 ..P WKT 2010 08 16 02 29 55 31.3200 -97.3300 251.000 457.0 92.147 3.510 -999.990 -999.990 0.921 ..P WKT 2010 08 16 02 39 55 31.3200 -97.3300 251.000 30.0 89.355 3.540 -999.990 -999.990 0.894 ..P WKT 2010 08 16 02 44 55 31.3200 -97.3300 251.000 122.0 88.678 4.110 -999.990 -999.990 0.887 ..P WKT 2010 08 16 02 49 55 31.3200 -97.3300 251.000 457.0 91.535 4.740 -999.990 -999.990 0.915 ..P WKT 2010 08 16 02 54 55 31.3200 -97.3300 251.000 30.0 95.073 5.550 -999.990 -999.990 0.951 ..P WKT 2010 08 16 02 59 55 31.3200 -97.3300 251.000 122.0 102.558 4.850 -999.990 -999.990 1.026 ..P WKT 2010 08 16 03 04 55 31.3200 -97.3300 251.000 457.0 100.929 3.840 -999.990 -999.990 1.009 ..P WKT 2010 08 16 03 14 55 31.3200 -97.3300 251.000 30.0 100.256 3.950 -999.990 -999.990 1.003 ..P WKT 2010 08 16 03 19 55 31.3200 -97.3300 251.000 122.0 99.851 4.960 -999.990 -999.990 0.999 ..P WKT 2010 08 16 03 24 55 31.3200 -97.3300 251.000 457.0 104.890 6.450 -999.990 -999.990 1.049 ..P WKT 2010 08 16 03 29 55 31.3200 -97.3300 251.000 30.0 93.187 4.480 -999.990 -999.990 0.932 ..P WKT 2010 08 16 03 34 55 31.3200 -97.3300 251.000 122.0 97.955 4.570 -999.990 -999.990 0.980 ..P WKT 2010 08 16 03 39 55 31.3200 -97.3300 251.000 457.0 94.146 4.270 -999.990 -999.990 0.941 ..P WKT 2010 08 16 03 49 55 31.3200 -97.3300 251.000 30.0 93.003 3.470 -999.990 -999.990 0.930 ..P WKT 2010 08 16 03 54 55 31.3200 -97.3300 251.000 122.0 100.303 5.120 -999.990 -999.990 1.003 ..P WKT 2010 08 16 03 59 55 31.3200 -97.3300 251.000 457.0 90.984 4.390 -999.990 -999.990 0.910 ..P WKT 2010 08 16 04 04 55 31.3200 -97.3300 251.000 30.0 92.019 5.430 -999.990 -999.990 0.920 ..P WKT 2010 08 16 04 09 55 31.3200 -97.3300 251.000 122.0 101.638 4.610 -999.990 -999.990 1.016 ..P WKT 2010 08 16 04 14 55 31.3200 -97.3300 251.000 457.0 96.404 4.410 -999.990 -999.990 0.964 ..P WKT 2010 08 16 04 24 55 31.3200 -97.3300 251.000 30.0 99.350 3.720 -999.990 -999.990 0.993 ..P WKT 2010 08 16 04 29 55 31.3200 -97.3300 251.000 122.0 100.308 4.890 -999.990 -999.990 1.003 ..P WKT 2010 08 16 04 34 55 31.3200 -97.3300 251.000 457.0 95.949 5.130 -999.990 -999.990 0.959 ..P WKT 2010 08 16 04 39 55 31.3200 -97.3300 251.000 30.0 106.180 6.400 -999.990 -999.990 1.062 ..P WKT 2010 08 16 04 44 55 31.3200 -97.3300 251.000 122.0 101.683 5.400 -999.990 -999.990 1.017 ..P WKT 2010 08 16 04 49 55 31.3200 -97.3300 251.000 457.0 92.274 3.770 -999.990 -999.990 0.923 ..P WKT 2010 08 16 05 04 55 31.3200 -97.3300 251.000 30.0 106.240 5.290 -999.990 -999.990 1.062 ..P WKT 2010 08 16 05 09 55 31.3200 -97.3300 251.000 122.0 99.576 6.230 -999.990 -999.990 0.996 ..P WKT 2010 08 16 05 14 55 31.3200 -97.3300 251.000 457.0 94.548 6.320 -999.990 -999.990 0.945 ..P WKT 2010 08 16 05 19 55 31.3200 -97.3300 251.000 30.0 113.546 4.180 -999.990 -999.990 1.135 ..P WKT 2010 08 16 05 24 55 31.3200 -97.3300 251.000 122.0 103.877 3.640 -999.990 -999.990 1.039 ..P WKT 2010 08 16 05 29 55 31.3200 -97.3300 251.000 457.0 99.667 4.350 -999.990 -999.990 0.997 ..P WKT 2010 08 16 05 39 55 31.3200 -97.3300 251.000 30.0 110.972 2.910 -999.990 -999.990 1.110 ..P WKT 2010 08 16 05 44 55 31.3200 -97.3300 251.000 122.0 101.356 4.880 -999.990 -999.990 1.014 ..P WKT 2010 08 16 05 49 55 31.3200 -97.3300 251.000 457.0 100.208 3.860 -999.990 -999.990 1.002 ..P WKT 2010 08 16 05 54 55 31.3200 -97.3300 251.000 30.0 110.811 3.470 -999.990 -999.990 1.108 ..P WKT 2010 08 16 05 59 55 31.3200 -97.3300 251.000 122.0 94.631 3.790 -999.990 -999.990 0.946 ..P WKT 2010 08 16 06 04 55 31.3200 -97.3300 251.000 457.0 94.849 2.730 -999.990 -999.990 0.948 ..P WKT 2010 08 16 06 14 55 31.3200 -97.3300 251.000 30.0 102.471 2.900 -999.990 -999.990 1.025 ..P WKT 2010 08 16 06 19 55 31.3200 -97.3300 251.000 122.0 98.940 4.600 -999.990 -999.990 0.989 ..P WKT 2010 08 16 06 24 55 31.3200 -97.3300 251.000 457.0 97.596 3.570 -999.990 -999.990 0.976 ..P WKT 2010 08 16 06 29 55 31.3200 -97.3300 251.000 30.0 106.644 3.740 -999.990 -999.990 1.066 ..P WKT 2010 08 16 06 34 55 31.3200 -97.3300 251.000 122.0 101.471 3.850 -999.990 -999.990 1.015 ..P WKT 2010 08 16 06 39 55 31.3200 -97.3300 251.000 457.0 92.739 4.020 -999.990 -999.990 0.927 ..P WKT 2010 08 16 06 49 55 31.3200 -97.3300 251.000 30.0 109.163 3.700 -999.990 -999.990 1.092 ..P WKT 2010 08 16 06 54 55 31.3200 -97.3300 251.000 122.0 106.138 3.170 -999.990 -999.990 1.061 ..P WKT 2010 08 16 06 59 55 31.3200 -97.3300 251.000 457.0 96.405 3.350 -999.990 -999.990 0.964 ..P WKT 2010 08 16 07 04 55 31.3200 -97.3300 251.000 30.0 109.940 3.390 -999.990 -999.990 1.099 ..P WKT 2010 08 16 07 09 55 31.3200 -97.3300 251.000 122.0 108.009 3.500 -999.990 -999.990 1.080 ..P WKT 2010 08 16 07 14 55 31.3200 -97.3300 251.000 457.0 100.874 3.120 -999.990 -999.990 1.009 ..P WKT 2010 08 16 07 24 55 31.3200 -97.3300 251.000 30.0 113.325 3.890 -999.990 -999.990 1.133 ..P WKT 2010 08 16 07 29 55 31.3200 -97.3300 251.000 122.0 109.906 4.730 -999.990 -999.990 1.099 ..P WKT 2010 08 16 07 34 55 31.3200 -97.3300 251.000 457.0 97.856 3.070 -999.990 -999.990 0.979 ..P WKT 2010 08 16 07 39 55 31.3200 -97.3300 251.000 30.0 118.546 2.930 -999.990 -999.990 1.185 ..P WKT 2010 08 16 07 44 55 31.3200 -97.3300 251.000 122.0 118.552 3.330 -999.990 -999.990 1.186 ..P WKT 2010 08 16 07 49 55 31.3200 -97.3300 251.000 457.0 94.713 2.880 -999.990 -999.990 0.947 ..P WKT 2010 08 16 07 59 55 31.3200 -97.3300 251.000 30.0 111.579 3.110 -999.990 -999.990 1.116 ..P WKT 2010 08 16 08 04 55 31.3200 -97.3300 251.000 122.0 122.551 2.730 -999.990 -999.990 1.226 ..P WKT 2010 08 16 08 09 55 31.3200 -97.3300 251.000 457.0 93.353 2.510 -999.990 -999.990 0.934 ..P WKT 2010 08 16 08 14 55 31.3200 -97.3300 251.000 30.0 107.206 3.950 -999.990 -999.990 1.072 ..P WKT 2010 08 16 08 19 55 31.3200 -97.3300 251.000 122.0 139.165 3.250 -999.990 -999.990 1.392 ..P WKT 2010 08 16 08 24 55 31.3200 -97.3300 251.000 457.0 90.344 2.710 -999.990 -999.990 0.903 ..P WKT 2010 08 16 08 34 55 31.3200 -97.3300 251.000 30.0 117.650 3.930 -999.990 -999.990 1.177 ..P WKT 2010 08 16 08 39 55 31.3200 -97.3300 251.000 122.0 126.987 2.630 -999.990 -999.990 1.270 ..P WKT 2010 08 16 08 44 55 31.3200 -97.3300 251.000 457.0 98.312 2.710 -999.990 -999.990 0.983 ..P WKT 2010 08 16 08 49 55 31.3200 -97.3300 251.000 30.0 130.707 3.160 -999.990 -999.990 1.307 ..P WKT 2010 08 16 08 54 55 31.3200 -97.3300 251.000 122.0 126.596 3.420 -999.990 -999.990 1.266 ..P WKT 2010 08 16 08 59 55 31.3200 -97.3300 251.000 457.0 96.811 3.070 -999.990 -999.990 0.968 ..P WKT 2010 08 16 09 09 55 31.3200 -97.3300 251.000 30.0 129.618 2.580 -999.990 -999.990 1.296 ..P WKT 2010 08 16 09 14 55 31.3200 -97.3300 251.000 122.0 124.112 2.860 -999.990 -999.990 1.241 ..P WKT 2010 08 16 09 19 55 31.3200 -97.3300 251.000 457.0 94.705 3.340 -999.990 -999.990 0.947 ..P WKT 2010 08 16 09 24 55 31.3200 -97.3300 251.000 30.0 132.878 3.850 -999.990 -999.990 1.329 ..P WKT 2010 08 16 09 29 55 31.3200 -97.3300 251.000 122.0 115.555 3.110 -999.990 -999.990 1.156 ..P WKT 2010 08 16 09 34 55 31.3200 -97.3300 251.000 457.0 91.082 2.520 -999.990 -999.990 0.911 ..P WKT 2010 08 16 09 44 55 31.3200 -97.3300 251.000 30.0 125.173 3.240 -999.990 -999.990 1.252 ..P WKT 2010 08 16 09 49 55 31.3200 -97.3300 251.000 122.0 108.154 2.870 -999.990 -999.990 1.082 ..P WKT 2010 08 16 09 54 55 31.3200 -97.3300 251.000 457.0 95.805 3.890 -999.990 -999.990 0.958 ..P WKT 2010 08 16 09 59 55 31.3200 -97.3300 251.000 30.0 123.052 3.420 -999.990 -999.990 1.231 ..P WKT 2010 08 16 10 04 55 31.3200 -97.3300 251.000 122.0 107.676 3.390 -999.990 -999.990 1.077 ..P WKT 2010 08 16 10 09 55 31.3200 -97.3300 251.000 457.0 91.747 3.300 -999.990 -999.990 0.917 ..P WKT 2010 08 16 10 19 55 31.3200 -97.3300 251.000 30.0 121.742 3.040 -999.990 -999.990 1.217 ..P WKT 2010 08 16 10 24 55 31.3200 -97.3300 251.000 122.0 110.171 3.050 -999.990 -999.990 1.102 ..P WKT 2010 08 16 10 29 55 31.3200 -97.3300 251.000 457.0 94.470 4.270 -999.990 -999.990 0.945 ..P WKT 2010 08 16 10 34 55 31.3200 -97.3300 251.000 30.0 121.702 4.950 -999.990 -999.990 1.217 ..P WKT 2010 08 16 10 39 55 31.3200 -97.3300 251.000 122.0 113.705 4.250 -999.990 -999.990 1.137 ..P WKT 2010 08 16 10 44 55 31.3200 -97.3300 251.000 457.0 92.767 3.060 -999.990 -999.990 0.928 ..P WKT 2010 08 16 10 54 55 31.3200 -97.3300 251.000 30.0 114.311 3.740 -999.990 -999.990 1.143 ..P WKT 2010 08 16 10 59 55 31.3200 -97.3300 251.000 122.0 110.126 4.240 -999.990 -999.990 1.101 ..P WKT 2010 08 16 11 04 55 31.3200 -97.3300 251.000 457.0 93.131 4.780 -999.990 -999.990 0.931 ..P WKT 2010 08 16 11 09 55 31.3200 -97.3300 251.000 30.0 121.313 4.450 -999.990 -999.990 1.213 ..P WKT 2010 08 16 11 14 55 31.3200 -97.3300 251.000 122.0 115.199 4.280 -999.990 -999.990 1.152 ..P WKT 2010 08 16 11 19 55 31.3200 -97.3300 251.000 457.0 99.300 3.260 -999.990 -999.990 0.993 ..P WKT 2010 08 16 11 29 55 31.3200 -97.3300 251.000 30.0 127.193 3.410 -999.990 -999.990 1.272 ..P WKT 2010 08 16 11 34 55 31.3200 -97.3300 251.000 122.0 123.308 3.870 -999.990 -999.990 1.233 ..P WKT 2010 08 16 11 39 55 31.3200 -97.3300 251.000 457.0 106.741 5.040 -999.990 -999.990 1.067 ..P WKT 2010 08 16 11 44 55 31.3200 -97.3300 251.000 30.0 119.948 3.930 -999.990 -999.990 1.199 ..P WKT 2010 08 16 11 49 55 31.3200 -97.3300 251.000 122.0 121.164 3.110 -999.990 -999.990 1.212 ..P WKT 2010 08 16 12 09 55 31.3200 -97.3300 251.000 457.0 101.245 3.050 -999.990 -999.990 1.012 ..P WKT 2010 08 16 12 10 25 31.3200 -97.3300 251.000 457.0 99.419 2.840 -999.990 -999.990 0.994 ..P WKT 2010 08 16 12 10 55 31.3200 -97.3300 251.000 457.0 99.937 2.880 -999.990 -999.990 0.999 ..P WKT 2010 08 16 12 11 25 31.3200 -97.3300 251.000 457.0 100.180 4.130 -999.990 -999.990 1.002 ..P WKT 2010 08 16 12 11 55 31.3200 -97.3300 251.000 457.0 103.457 3.530 -999.990 -999.990 1.035 ..P WKT 2010 08 16 12 12 25 31.3200 -97.3300 251.000 457.0 99.286 3.050 -999.990 -999.990 0.993 ..P WKT 2010 08 16 12 12 55 31.3200 -97.3300 251.000 457.0 96.080 3.580 -999.990 -999.990 0.961 ..P WKT 2010 08 16 12 13 25 31.3200 -97.3300 251.000 457.0 98.943 4.620 -999.990 -999.990 0.989 ..P WKT 2010 08 16 12 13 55 31.3200 -97.3300 251.000 457.0 103.462 2.910 -999.990 -999.990 1.035 ..P WKT 2010 08 16 12 14 25 31.3200 -97.3300 251.000 457.0 102.601 4.020 -999.990 -999.990 1.026 ..P WKT 2010 08 16 12 14 55 31.3200 -97.3300 251.000 457.0 97.188 2.870 -999.990 -999.990 0.972 ..P WKT 2010 08 16 12 19 55 31.3200 -97.3300 251.000 30.0 118.237 4.440 -999.990 -999.990 1.182 ..P WKT 2010 08 16 12 24 55 31.3200 -97.3300 251.000 122.0 113.077 4.290 -999.990 -999.990 1.131 ..P WKT 2010 08 16 12 29 55 31.3200 -97.3300 251.000 457.0 95.638 3.160 -999.990 -999.990 0.956 ..P WKT 2010 08 16 12 34 55 31.3200 -97.3300 251.000 30.0 124.139 3.940 -999.990 -999.990 1.241 ..P WKT 2010 08 16 12 39 55 31.3200 -97.3300 251.000 122.0 114.839 2.250 -999.990 -999.990 1.148 ..P WKT 2010 08 16 12 44 55 31.3200 -97.3300 251.000 457.0 102.090 2.450 -999.990 -999.990 1.021 ..P WKT 2010 08 16 12 54 55 31.3200 -97.3300 251.000 30.0 120.275 2.890 -999.990 -999.990 1.203 ..P WKT 2010 08 16 12 59 55 31.3200 -97.3300 251.000 122.0 112.578 4.090 -999.990 -999.990 1.126 ..P WKT 2010 08 16 13 04 55 31.3200 -97.3300 251.000 457.0 113.159 3.790 -999.990 -999.990 1.132 ..P WKT 2010 08 16 13 09 55 31.3200 -97.3300 251.000 30.0 120.915 3.280 -999.990 -999.990 1.209 ..P WKT 2010 08 16 13 14 55 31.3200 -97.3300 251.000 122.0 120.392 2.970 -999.990 -999.990 1.204 ..P WKT 2010 08 16 13 19 55 31.3200 -97.3300 251.000 457.0 109.382 2.950 -999.990 -999.990 1.094 ..P WKT 2010 08 16 13 29 55 31.3200 -97.3300 251.000 30.0 127.499 3.750 -999.990 -999.990 1.275 ..P WKT 2010 08 16 13 34 55 31.3200 -97.3300 251.000 122.0 128.751 2.630 -999.990 -999.990 1.288 ..P WKT 2010 08 16 13 39 55 31.3200 -97.3300 251.000 457.0 117.030 3.070 -999.990 -999.990 1.170 ..P WKT 2010 08 16 13 44 55 31.3200 -97.3300 251.000 30.0 122.974 3.150 -999.990 -999.990 1.230 ..P WKT 2010 08 16 13 49 55 31.3200 -97.3300 251.000 122.0 134.163 3.430 -999.990 -999.990 1.342 ..P WKT 2010 08 16 13 54 55 31.3200 -97.3300 251.000 457.0 113.608 3.270 -999.990 -999.990 1.136 ..P WKT 2010 08 16 14 04 55 31.3200 -97.3300 251.000 30.0 117.886 4.170 -999.990 -999.990 1.179 ..P WKT 2010 08 16 14 09 55 31.3200 -97.3300 251.000 122.0 130.575 3.820 -999.990 -999.990 1.306 ..P WKT 2010 08 16 14 14 55 31.3200 -97.3300 251.000 457.0 117.590 3.200 -999.990 -999.990 1.176 ..P WKT 2010 08 16 14 19 55 31.3200 -97.3300 251.000 30.0 117.855 3.480 -999.990 -999.990 1.179 ..P WKT 2010 08 16 14 24 55 31.3200 -97.3300 251.000 122.0 124.195 3.740 -999.990 -999.990 1.242 ..P WKT 2010 08 16 14 29 55 31.3200 -97.3300 251.000 457.0 112.037 4.310 -999.990 -999.990 1.120 ..P WKT 2010 08 16 14 39 55 31.3200 -97.3300 251.000 30.0 116.573 4.310 -999.990 -999.990 1.166 ..P WKT 2010 08 16 14 44 55 31.3200 -97.3300 251.000 122.0 132.439 4.060 -999.990 -999.990 1.324 ..P WKT 2010 08 16 14 49 55 31.3200 -97.3300 251.000 457.0 105.783 4.610 -999.990 -999.990 1.058 ..P WKT 2010 08 16 14 54 55 31.3200 -97.3300 251.000 30.0 117.095 4.050 -999.990 -999.990 1.171 ..P WKT 2010 08 16 14 59 55 31.3200 -97.3300 251.000 122.0 126.059 4.210 -999.990 -999.990 1.261 ..P WKT 2010 08 16 15 04 55 31.3200 -97.3300 251.000 457.0 106.443 4.040 -999.990 -999.990 1.064 ..P WKT 2010 08 16 15 14 55 31.3200 -97.3300 251.000 30.0 112.221 4.710 -999.990 -999.990 1.122 ..P WKT 2010 08 16 15 19 55 31.3200 -97.3300 251.000 122.0 127.400 3.690 -999.990 -999.990 1.274 ..P WKT 2010 08 16 15 24 55 31.3200 -97.3300 251.000 457.0 118.691 3.840 -999.990 -999.990 1.187 ..P WKT 2010 08 16 15 29 55 31.3200 -97.3300 251.000 30.0 116.057 5.040 -999.990 -999.990 1.161 ..P WKT 2010 08 16 15 34 55 31.3200 -97.3300 251.000 122.0 120.052 4.400 -999.990 -999.990 1.201 ..P WKT 2010 08 16 15 39 55 31.3200 -97.3300 251.000 457.0 103.883 3.740 -999.990 -999.990 1.039 ..P WKT 2010 08 16 15 49 55 31.3200 -97.3300 251.000 30.0 106.151 3.530 -999.990 -999.990 1.062 ..P WKT 2010 08 16 15 54 55 31.3200 -97.3300 251.000 122.0 117.959 3.930 -999.990 -999.990 1.180 ..P WKT 2010 08 16 15 59 55 31.3200 -97.3300 251.000 457.0 107.945 3.970 -999.990 -999.990 1.079 ..P WKT 2010 08 16 16 04 55 31.3200 -97.3300 251.000 30.0 104.975 4.010 -999.990 -999.990 1.050 ..P WKT 2010 08 16 16 09 55 31.3200 -97.3300 251.000 122.0 117.198 4.240 -999.990 -999.990 1.172 ..P WKT 2010 08 16 16 14 55 31.3200 -97.3300 251.000 457.0 103.593 3.890 -999.990 -999.990 1.036 ..P WKT 2010 08 16 16 24 55 31.3200 -97.3300 251.000 30.0 104.755 4.040 -999.990 -999.990 1.048 ..P WKT 2010 08 16 16 29 55 31.3200 -97.3300 251.000 122.0 125.604 3.630 -999.990 -999.990 1.256 ..P WKT 2010 08 16 16 34 55 31.3200 -97.3300 251.000 457.0 111.089 3.560 -999.990 -999.990 1.111 ..P WKT 2010 08 16 16 39 55 31.3200 -97.3300 251.000 30.0 113.704 4.360 -999.990 -999.990 1.137 ..P WKT 2010 08 16 16 44 55 31.3200 -97.3300 251.000 122.0 126.956 4.720 -999.990 -999.990 1.270 ..P WKT 2010 08 16 16 49 55 31.3200 -97.3300 251.000 457.0 115.342 4.120 -999.990 -999.990 1.153 ..P WKT 2010 08 16 17 04 55 31.3200 -97.3300 251.000 30.0 108.333 3.660 -999.990 -999.990 1.083 ..P WKT 2010 08 16 17 09 55 31.3200 -97.3300 251.000 122.0 114.092 4.470 -999.990 -999.990 1.141 ..P WKT 2010 08 16 17 14 55 31.3200 -97.3300 251.000 457.0 107.691 4.450 -999.990 -999.990 1.077 ..P WKT 2010 08 16 17 19 55 31.3200 -97.3300 251.000 30.0 107.646 5.360 -999.990 -999.990 1.076 ..P WKT 2010 08 16 17 24 55 31.3200 -97.3300 251.000 122.0 113.957 3.880 -999.990 -999.990 1.140 ..P WKT 2010 08 16 17 29 55 31.3200 -97.3300 251.000 457.0 106.173 3.090 -999.990 -999.990 1.062 ..P WKT 2010 08 16 17 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 08 16 17 44 55 31.3200 -97.3300 251.000 122.0 107.372 4.070 -999.990 -999.990 1.074 ..P WKT 2010 08 16 17 49 55 31.3200 -97.3300 251.000 457.0 103.017 4.590 -999.990 -999.990 1.030 ..P WKT 2010 08 16 17 54 55 31.3200 -97.3300 251.000 30.0 95.346 3.930 -999.990 -999.990 0.953 ..P WKT 2010 08 16 17 59 55 31.3200 -97.3300 251.000 122.0 112.276 4.110 -999.990 -999.990 1.123 ..P WKT 2010 08 16 18 04 55 31.3200 -97.3300 251.000 457.0 106.540 4.330 -999.990 -999.990 1.065 ..P WKT 2010 08 16 18 14 55 31.3200 -97.3300 251.000 30.0 104.643 3.220 -999.990 -999.990 1.046 ..P WKT 2010 08 16 18 19 55 31.3200 -97.3300 251.000 122.0 121.753 3.250 -999.990 -999.990 1.218 ..P WKT 2010 08 16 18 24 55 31.3200 -97.3300 251.000 457.0 102.094 4.520 -999.990 -999.990 1.021 ..P WKT 2010 08 16 18 29 55 31.3200 -97.3300 251.000 30.0 101.787 6.170 -999.990 -999.990 1.018 ..P WKT 2010 08 16 18 34 55 31.3200 -97.3300 251.000 122.0 113.370 5.020 -999.990 -999.990 1.134 ..P WKT 2010 08 16 18 39 55 31.3200 -97.3300 251.000 457.0 108.087 3.890 -999.990 -999.990 1.081 ..P WKT 2010 08 16 18 49 55 31.3200 -97.3300 251.000 30.0 106.367 4.130 -999.990 -999.990 1.064 ..P WKT 2010 08 16 18 54 55 31.3200 -97.3300 251.000 122.0 125.416 5.470 -999.990 -999.990 1.254 ..P WKT 2010 08 16 18 59 55 31.3200 -97.3300 251.000 457.0 108.934 5.370 -999.990 -999.990 1.089 ..P WKT 2010 08 16 19 04 55 31.3200 -97.3300 251.000 30.0 101.852 4.760 -999.990 -999.990 1.019 ..P WKT 2010 08 16 19 09 55 31.3200 -97.3300 251.000 122.0 122.976 3.570 -999.990 -999.990 1.230 ..P WKT 2010 08 16 19 14 55 31.3200 -97.3300 251.000 457.0 106.907 3.750 -999.990 -999.990 1.069 ..P WKT 2010 08 16 19 24 55 31.3200 -97.3300 251.000 30.0 103.706 3.020 -999.990 -999.990 1.037 ..P WKT 2010 08 16 19 29 55 31.3200 -97.3300 251.000 122.0 120.586 4.520 -999.990 -999.990 1.206 ..P WKT 2010 08 16 19 34 55 31.3200 -97.3300 251.000 457.0 102.618 3.570 -999.990 -999.990 1.026 ..P WKT 2010 08 16 19 39 55 31.3200 -97.3300 251.000 30.0 100.969 4.120 -999.990 -999.990 1.010 ..P WKT 2010 08 16 19 44 55 31.3200 -97.3300 251.000 122.0 117.711 4.470 -999.990 -999.990 1.177 ..P WKT 2010 08 16 19 49 55 31.3200 -97.3300 251.000 457.0 100.295 3.150 -999.990 -999.990 1.003 ..P WKT 2010 08 16 19 59 55 31.3200 -97.3300 251.000 30.0 109.007 3.950 -999.990 -999.990 1.090 ..P WKT 2010 08 16 20 04 55 31.3200 -97.3300 251.000 122.0 117.156 4.960 -999.990 -999.990 1.172 ..P WKT 2010 08 16 20 09 55 31.3200 -97.3300 251.000 457.0 107.050 3.600 -999.990 -999.990 1.071 ..P WKT 2010 08 16 20 14 55 31.3200 -97.3300 251.000 30.0 100.262 4.040 -999.990 -999.990 1.003 ..P WKT 2010 08 16 20 19 55 31.3200 -97.3300 251.000 122.0 115.605 3.840 -999.990 -999.990 1.156 ..P WKT 2010 08 16 20 24 55 31.3200 -97.3300 251.000 457.0 102.178 3.670 -999.990 -999.990 1.022 ..P WKT 2010 08 16 20 34 55 31.3200 -97.3300 251.000 30.0 102.215 4.080 -999.990 -999.990 1.022 ..P WKT 2010 08 16 20 39 55 31.3200 -97.3300 251.000 122.0 115.406 4.470 -999.990 -999.990 1.154 ..P WKT 2010 08 16 20 44 55 31.3200 -97.3300 251.000 457.0 98.024 4.060 -999.990 -999.990 0.980 ..P WKT 2010 08 16 20 49 55 31.3200 -97.3300 251.000 30.0 97.796 4.220 -999.990 -999.990 0.978 ..P WKT 2010 08 16 20 54 55 31.3200 -97.3300 251.000 122.0 121.363 4.540 -999.990 -999.990 1.214 ..P WKT 2010 08 16 20 59 55 31.3200 -97.3300 251.000 457.0 102.044 4.670 -999.990 -999.990 1.020 ..P WKT 2010 08 16 21 09 55 31.3200 -97.3300 251.000 30.0 104.849 4.500 -999.990 -999.990 1.048 ..P WKT 2010 08 16 21 14 55 31.3200 -97.3300 251.000 122.0 120.335 4.720 -999.990 -999.990 1.203 ..P WKT 2010 08 16 21 19 55 31.3200 -97.3300 251.000 457.0 103.168 4.120 -999.990 -999.990 1.032 ..P WKT 2010 08 16 21 24 55 31.3200 -97.3300 251.000 30.0 104.265 4.380 -999.990 -999.990 1.043 ..P WKT 2010 08 16 21 29 55 31.3200 -97.3300 251.000 122.0 121.412 4.570 -999.990 -999.990 1.214 ..P WKT 2010 08 16 21 34 55 31.3200 -97.3300 251.000 457.0 106.181 4.330 -999.990 -999.990 1.062 ..P WKT 2010 08 16 21 44 55 31.3200 -97.3300 251.000 30.0 105.705 3.540 -999.990 -999.990 1.057 ..P WKT 2010 08 16 21 49 55 31.3200 -97.3300 251.000 122.0 118.248 3.580 -999.990 -999.990 1.182 ..P WKT 2010 08 16 21 54 55 31.3200 -97.3300 251.000 457.0 108.373 4.020 -999.990 -999.990 1.084 ..P WKT 2010 08 16 21 59 55 31.3200 -97.3300 251.000 30.0 106.524 3.670 -999.990 -999.990 1.065 ..P WKT 2010 08 16 22 04 55 31.3200 -97.3300 251.000 122.0 119.345 3.850 -999.990 -999.990 1.193 ..P WKT 2010 08 16 22 09 55 31.3200 -97.3300 251.000 457.0 111.960 3.980 -999.990 -999.990 1.120 ..P WKT 2010 08 16 22 19 55 31.3200 -97.3300 251.000 30.0 115.340 5.210 -999.990 -999.990 1.153 ..P WKT 2010 08 16 22 24 55 31.3200 -97.3300 251.000 122.0 125.968 3.900 -999.990 -999.990 1.260 ..P WKT 2010 08 16 22 29 55 31.3200 -97.3300 251.000 457.0 116.249 5.070 -999.990 -999.990 1.162 ..P WKT 2010 08 16 22 34 55 31.3200 -97.3300 251.000 30.0 106.392 4.100 -999.990 -999.990 1.064 ..P WKT 2010 08 16 22 39 55 31.3200 -97.3300 251.000 122.0 111.760 4.080 -999.990 -999.990 1.118 ..P WKT 2010 08 16 22 44 55 31.3200 -97.3300 251.000 457.0 116.021 4.030 -999.990 -999.990 1.160 ..P WKT 2010 08 16 22 54 55 31.3200 -97.3300 251.000 30.0 104.056 4.150 -999.990 -999.990 1.041 ..P WKT 2010 08 16 22 59 55 31.3200 -97.3300 251.000 122.0 109.425 4.470 -999.990 -999.990 1.094 ..P WKT 2010 08 16 23 04 55 31.3200 -97.3300 251.000 457.0 116.179 4.280 -999.990 -999.990 1.162 ..P WKT 2010 08 16 23 09 55 31.3200 -97.3300 251.000 30.0 109.504 4.920 -999.990 -999.990 1.095 ..P WKT 2010 08 16 23 14 55 31.3200 -97.3300 251.000 122.0 115.288 4.940 -999.990 -999.990 1.153 ..P WKT 2010 08 16 23 19 55 31.3200 -97.3300 251.000 457.0 118.997 4.620 -999.990 -999.990 1.190 ..P WKT 2010 08 16 23 29 55 31.3200 -97.3300 251.000 30.0 102.947 4.070 -999.990 -999.990 1.029 ..P WKT 2010 08 16 23 34 55 31.3200 -97.3300 251.000 122.0 117.389 4.880 -999.990 -999.990 1.174 ..P WKT 2010 08 16 23 39 55 31.3200 -97.3300 251.000 457.0 107.599 4.780 -999.990 -999.990 1.076 ..P WKT 2010 08 16 23 44 55 31.3200 -97.3300 251.000 30.0 107.641 5.250 -999.990 -999.990 1.076 ..P WKT 2010 08 16 23 49 55 31.3200 -97.3300 251.000 122.0 112.114 4.030 -999.990 -999.990 1.121 ..P WKT 2010 08 17 00 09 55 31.3200 -97.3300 251.000 457.0 106.413 4.070 -999.990 -999.990 1.064 ..P WKT 2010 08 17 00 10 25 31.3200 -97.3300 251.000 457.0 109.469 4.880 -999.990 -999.990 1.095 ..P WKT 2010 08 17 00 10 55 31.3200 -97.3300 251.000 457.0 104.216 4.540 -999.990 -999.990 1.042 ..P WKT 2010 08 17 00 11 25 31.3200 -97.3300 251.000 457.0 110.041 4.130 -999.990 -999.990 1.100 ..P WKT 2010 08 17 00 11 55 31.3200 -97.3300 251.000 457.0 108.110 3.890 -999.990 -999.990 1.081 ..P WKT 2010 08 17 00 12 25 31.3200 -97.3300 251.000 457.0 107.842 4.160 -999.990 -999.990 1.078 ..P WKT 2010 08 17 00 12 55 31.3200 -97.3300 251.000 457.0 104.804 4.330 -999.990 -999.990 1.048 ..P WKT 2010 08 17 00 13 25 31.3200 -97.3300 251.000 457.0 102.598 4.050 -999.990 -999.990 1.026 ..P WKT 2010 08 17 00 13 55 31.3200 -97.3300 251.000 457.0 103.714 4.140 -999.990 -999.990 1.037 ..P WKT 2010 08 17 00 14 25 31.3200 -97.3300 251.000 457.0 105.385 4.140 -999.990 -999.990 1.054 ..P WKT 2010 08 17 00 14 55 31.3200 -97.3300 251.000 457.0 108.718 3.800 -999.990 -999.990 1.087 ..P WKT 2010 08 17 00 19 55 31.3200 -97.3300 251.000 30.0 107.421 3.980 -999.990 -999.990 1.074 ..P WKT 2010 08 17 00 24 55 31.3200 -97.3300 251.000 122.0 115.820 4.610 -999.990 -999.990 1.158 ..P WKT 2010 08 17 00 29 55 31.3200 -97.3300 251.000 457.0 112.031 4.540 -999.990 -999.990 1.120 ..P WKT 2010 08 17 00 34 55 31.3200 -97.3300 251.000 30.0 109.349 4.690 -999.990 -999.990 1.093 ..P WKT 2010 08 17 00 39 55 31.3200 -97.3300 251.000 122.0 119.134 4.630 -999.990 -999.990 1.191 ..P WKT 2010 08 17 00 44 55 31.3200 -97.3300 251.000 457.0 118.946 3.940 -999.990 -999.990 1.189 ..P WKT 2010 08 17 00 54 55 31.3200 -97.3300 251.000 30.0 116.198 5.870 -999.990 -999.990 1.162 ..P WKT 2010 08 17 00 59 55 31.3200 -97.3300 251.000 122.0 122.503 4.090 -999.990 -999.990 1.225 ..P WKT 2010 08 17 01 04 55 31.3200 -97.3300 251.000 457.0 110.798 4.310 -999.990 -999.990 1.108 ..P WKT 2010 08 17 01 09 55 31.3200 -97.3300 251.000 30.0 114.887 5.060 -999.990 -999.990 1.149 ..P WKT 2010 08 17 01 14 55 31.3200 -97.3300 251.000 122.0 121.193 4.450 -999.990 -999.990 1.212 ..P WKT 2010 08 17 01 19 55 31.3200 -97.3300 251.000 457.0 123.066 5.140 -999.990 -999.990 1.231 ..P WKT 2010 08 17 01 29 55 31.3200 -97.3300 251.000 30.0 112.995 5.070 -999.990 -999.990 1.130 ..P WKT 2010 08 17 01 34 55 31.3200 -97.3300 251.000 122.0 125.161 5.180 -999.990 -999.990 1.252 ..P WKT 2010 08 17 01 39 55 31.3200 -97.3300 251.000 457.0 126.796 4.760 -999.990 -999.990 1.268 ..P WKT 2010 08 17 01 44 55 31.3200 -97.3300 251.000 30.0 118.177 4.890 -999.990 -999.990 1.182 ..P WKT 2010 08 17 01 49 55 31.3200 -97.3300 251.000 122.0 111.497 4.280 -999.990 -999.990 1.115 ..P WKT 2010 08 17 01 54 55 31.3200 -97.3300 251.000 457.0 117.845 4.150 -999.990 -999.990 1.178 ..P WKT 2010 08 17 02 04 55 31.3200 -97.3300 251.000 30.0 116.720 4.260 -999.990 -999.990 1.167 ..P WKT 2010 08 17 02 09 55 31.3200 -97.3300 251.000 122.0 120.475 6.010 -999.990 -999.990 1.205 ..P WKT 2010 08 17 02 14 55 31.3200 -97.3300 251.000 457.0 115.219 4.540 -999.990 -999.990 1.152 ..P WKT 2010 08 17 02 19 55 31.3200 -97.3300 251.000 30.0 115.232 5.710 -999.990 -999.990 1.152 ..P WKT 2010 08 17 02 24 55 31.3200 -97.3300 251.000 122.0 119.263 4.530 -999.990 -999.990 1.193 ..P WKT 2010 08 17 02 29 55 31.3200 -97.3300 251.000 457.0 106.106 4.760 -999.990 -999.990 1.061 ..P WKT 2010 08 17 02 39 55 31.3200 -97.3300 251.000 30.0 113.912 4.870 -999.990 -999.990 1.139 ..P WKT 2010 08 17 02 44 55 31.3200 -97.3300 251.000 122.0 120.737 5.000 -999.990 -999.990 1.207 ..P WKT 2010 08 17 02 49 55 31.3200 -97.3300 251.000 457.0 101.221 4.680 -999.990 -999.990 1.012 ..P WKT 2010 08 17 02 54 55 31.3200 -97.3300 251.000 30.0 117.612 4.600 -999.990 -999.990 1.176 ..P WKT 2010 08 17 02 59 55 31.3200 -97.3300 251.000 122.0 115.842 4.850 -999.990 -999.990 1.158 ..P WKT 2010 08 17 03 04 55 31.3200 -97.3300 251.000 457.0 112.546 4.620 -999.990 -999.990 1.125 ..P WKT 2010 08 17 03 14 55 31.3200 -97.3300 251.000 30.0 119.285 4.070 -999.990 -999.990 1.193 ..P WKT 2010 08 17 03 19 55 31.3200 -97.3300 251.000 122.0 123.080 4.720 -999.990 -999.990 1.231 ..P WKT 2010 08 17 03 24 55 31.3200 -97.3300 251.000 457.0 104.688 4.430 -999.990 -999.990 1.047 ..P WKT 2010 08 17 03 29 55 31.3200 -97.3300 251.000 30.0 124.432 4.580 -999.990 -999.990 1.244 ..P WKT 2010 08 17 03 34 55 31.3200 -97.3300 251.000 122.0 118.382 4.530 -999.990 -999.990 1.184 ..P WKT 2010 08 17 03 39 55 31.3200 -97.3300 251.000 457.0 116.769 3.710 -999.990 -999.990 1.168 ..P WKT 2010 08 17 03 49 55 31.3200 -97.3300 251.000 30.0 122.638 3.540 -999.990 -999.990 1.226 ..P WKT 2010 08 17 03 54 55 31.3200 -97.3300 251.000 122.0 123.047 4.430 -999.990 -999.990 1.230 ..P WKT 2010 08 17 03 59 55 31.3200 -97.3300 251.000 457.0 109.584 4.230 -999.990 -999.990 1.096 ..P WKT 2010 08 17 04 04 55 31.3200 -97.3300 251.000 30.0 121.783 4.290 -999.990 -999.990 1.218 ..P WKT 2010 08 17 04 09 55 31.3200 -97.3300 251.000 122.0 120.111 3.990 -999.990 -999.990 1.201 ..P WKT 2010 08 17 04 14 55 31.3200 -97.3300 251.000 457.0 104.566 3.710 -999.990 -999.990 1.046 ..P WKT 2010 08 17 04 24 55 31.3200 -97.3300 251.000 30.0 123.912 3.730 -999.990 -999.990 1.239 ..P WKT 2010 08 17 04 29 55 31.3200 -97.3300 251.000 122.0 109.139 4.060 -999.990 -999.990 1.091 ..P WKT 2010 08 17 04 34 55 31.3200 -97.3300 251.000 457.0 110.737 4.840 -999.990 -999.990 1.107 ..P WKT 2010 08 17 04 39 55 31.3200 -97.3300 251.000 30.0 121.492 4.120 -999.990 -999.990 1.215 ..P WKT 2010 08 17 04 44 55 31.3200 -97.3300 251.000 122.0 118.927 4.380 -999.990 -999.990 1.189 ..P WKT 2010 08 17 04 49 55 31.3200 -97.3300 251.000 457.0 105.817 4.050 -999.990 -999.990 1.058 ..P WKT 2010 08 17 05 04 55 31.3200 -97.3300 251.000 30.0 114.376 3.660 -999.990 -999.990 1.144 ..P WKT 2010 08 17 05 09 55 31.3200 -97.3300 251.000 122.0 120.355 3.710 -999.990 -999.990 1.204 ..P WKT 2010 08 17 05 14 55 31.3200 -97.3300 251.000 457.0 111.901 3.590 -999.990 -999.990 1.119 ..P WKT 2010 08 17 05 19 55 31.3200 -97.3300 251.000 30.0 115.105 3.770 -999.990 -999.990 1.151 ..P WKT 2010 08 17 05 24 55 31.3200 -97.3300 251.000 122.0 117.476 3.310 -999.990 -999.990 1.175 ..P WKT 2010 08 17 05 29 55 31.3200 -97.3300 251.000 457.0 98.473 3.780 -999.990 -999.990 0.985 ..P WKT 2010 08 17 05 39 55 31.3200 -97.3300 251.000 30.0 122.747 3.690 -999.990 -999.990 1.227 ..P WKT 2010 08 17 05 44 55 31.3200 -97.3300 251.000 122.0 124.108 3.820 -999.990 -999.990 1.241 ..P WKT 2010 08 17 05 49 55 31.3200 -97.3300 251.000 457.0 106.590 3.650 -999.990 -999.990 1.066 ..P WKT 2010 08 17 05 54 55 31.3200 -97.3300 251.000 30.0 123.498 3.860 -999.990 -999.990 1.235 ..P WKT 2010 08 17 05 59 55 31.3200 -97.3300 251.000 122.0 113.198 4.100 -999.990 -999.990 1.132 ..P WKT 2010 08 17 06 04 55 31.3200 -97.3300 251.000 457.0 106.367 4.750 -999.990 -999.990 1.064 ..P WKT 2010 08 17 06 14 55 31.3200 -97.3300 251.000 30.0 125.907 4.630 -999.990 -999.990 1.259 ..P WKT 2010 08 17 06 19 55 31.3200 -97.3300 251.000 122.0 123.262 4.880 -999.990 -999.990 1.233 ..P WKT 2010 08 17 06 24 55 31.3200 -97.3300 251.000 457.0 102.288 4.060 -999.990 -999.990 1.023 ..P WKT 2010 08 17 06 29 55 31.3200 -97.3300 251.000 30.0 122.274 3.880 -999.990 -999.990 1.223 ..P WKT 2010 08 17 06 34 55 31.3200 -97.3300 251.000 122.0 114.491 4.210 -999.990 -999.990 1.145 ..P WKT 2010 08 17 06 39 55 31.3200 -97.3300 251.000 457.0 106.289 3.470 -999.990 -999.990 1.063 ..P WKT 2010 08 17 06 49 55 31.3200 -97.3300 251.000 30.0 122.798 3.360 -999.990 -999.990 1.228 ..P WKT 2010 08 17 06 54 55 31.3200 -97.3300 251.000 122.0 109.876 5.100 -999.990 -999.990 1.099 ..P WKT 2010 08 17 06 59 55 31.3200 -97.3300 251.000 457.0 110.701 4.630 -999.990 -999.990 1.107 ..P WKT 2010 08 17 07 04 55 31.3200 -97.3300 251.000 30.0 117.915 5.380 -999.990 -999.990 1.179 ..P WKT 2010 08 17 07 09 55 31.3200 -97.3300 251.000 122.0 113.323 4.420 -999.990 -999.990 1.133 ..P WKT 2010 08 17 07 14 55 31.3200 -97.3300 251.000 457.0 110.816 3.360 -999.990 -999.990 1.108 ..P WKT 2010 08 17 07 24 55 31.3200 -97.3300 251.000 30.0 116.118 3.530 -999.990 -999.990 1.161 ..P WKT 2010 08 17 07 29 55 31.3200 -97.3300 251.000 122.0 117.260 5.180 -999.990 -999.990 1.173 ..P WKT 2010 08 17 07 34 55 31.3200 -97.3300 251.000 457.0 123.821 4.580 -999.990 -999.990 1.238 ..P WKT 2010 08 17 07 39 55 31.3200 -97.3300 251.000 30.0 121.075 4.490 -999.990 -999.990 1.211 ..P WKT 2010 08 17 07 44 55 31.3200 -97.3300 251.000 122.0 121.802 4.530 -999.990 -999.990 1.218 ..P WKT 2010 08 17 07 49 55 31.3200 -97.3300 251.000 457.0 114.054 5.160 -999.990 -999.990 1.141 ..P WKT 2010 08 17 07 59 55 31.3200 -97.3300 251.000 30.0 123.010 4.910 -999.990 -999.990 1.230 ..P WKT 2010 08 17 08 04 55 31.3200 -97.3300 251.000 122.0 115.955 4.560 -999.990 -999.990 1.160 ..P WKT 2010 08 17 08 09 55 31.3200 -97.3300 251.000 457.0 113.903 4.440 -999.990 -999.990 1.139 ..P WKT 2010 08 17 08 14 55 31.3200 -97.3300 251.000 30.0 119.910 4.560 -999.990 -999.990 1.199 ..P WKT 2010 08 17 08 19 55 31.3200 -97.3300 251.000 122.0 113.132 4.080 -999.990 -999.990 1.131 ..P WKT 2010 08 17 08 24 55 31.3200 -97.3300 251.000 457.0 109.968 4.260 -999.990 -999.990 1.100 ..P WKT 2010 08 17 08 34 55 31.3200 -97.3300 251.000 30.0 123.968 4.170 -999.990 -999.990 1.240 ..P WKT 2010 08 17 08 39 55 31.3200 -97.3300 251.000 122.0 118.898 4.230 -999.990 -999.990 1.189 ..P WKT 2010 08 17 08 44 55 31.3200 -97.3300 251.000 457.0 108.824 4.420 -999.990 -999.990 1.088 ..P WKT 2010 08 17 08 49 55 31.3200 -97.3300 251.000 30.0 121.821 4.140 -999.990 -999.990 1.218 ..P WKT 2010 08 17 08 54 55 31.3200 -97.3300 251.000 122.0 114.526 3.900 -999.990 -999.990 1.145 ..P WKT 2010 08 17 08 59 55 31.3200 -97.3300 251.000 457.0 110.289 3.330 -999.990 -999.990 1.103 ..P WKT 2010 08 17 09 09 55 31.3200 -97.3300 251.000 30.0 116.031 3.330 -999.990 -999.990 1.160 ..P WKT 2010 08 17 09 14 55 31.3200 -97.3300 251.000 122.0 115.447 3.720 -999.990 -999.990 1.154 ..P WKT 2010 08 17 09 19 55 31.3200 -97.3300 251.000 457.0 127.375 4.500 -999.990 -999.990 1.274 ..P WKT 2010 08 17 09 24 55 31.3200 -97.3300 251.000 30.0 117.894 4.120 -999.990 -999.990 1.179 ..P WKT 2010 08 17 09 29 55 31.3200 -97.3300 251.000 122.0 116.754 3.390 -999.990 -999.990 1.168 ..P WKT 2010 08 17 09 34 55 31.3200 -97.3300 251.000 457.0 124.512 3.520 -999.990 -999.990 1.245 ..P WKT 2010 08 17 09 44 55 31.3200 -97.3300 251.000 30.0 124.160 3.200 -999.990 -999.990 1.242 ..P WKT 2010 08 17 09 49 55 31.3200 -97.3300 251.000 122.0 112.989 3.930 -999.990 -999.990 1.130 ..P WKT 2010 08 17 09 54 55 31.3200 -97.3300 251.000 457.0 121.145 4.100 -999.990 -999.990 1.211 ..P WKT 2010 08 17 09 59 55 31.3200 -97.3300 251.000 30.0 111.781 4.150 -999.990 -999.990 1.118 ..P WKT 2010 08 17 10 04 55 31.3200 -97.3300 251.000 122.0 114.653 3.330 -999.990 -999.990 1.147 ..P WKT 2010 08 17 10 09 55 31.3200 -97.3300 251.000 457.0 121.976 5.610 -999.990 -999.990 1.220 ..P WKT 2010 08 17 10 19 55 31.3200 -97.3300 251.000 30.0 112.285 3.270 -999.990 -999.990 1.123 ..P WKT 2010 08 17 10 24 55 31.3200 -97.3300 251.000 122.0 111.125 3.680 -999.990 -999.990 1.111 ..P WKT 2010 08 17 10 29 55 31.3200 -97.3300 251.000 457.0 117.753 3.810 -999.990 -999.990 1.178 ..P WKT 2010 08 17 10 34 55 31.3200 -97.3300 251.000 30.0 113.255 3.070 -999.990 -999.990 1.133 ..P WKT 2010 08 17 10 39 55 31.3200 -97.3300 251.000 122.0 107.365 4.320 -999.990 -999.990 1.074 ..P WKT 2010 08 17 10 44 55 31.3200 -97.3300 251.000 457.0 115.246 3.700 -999.990 -999.990 1.152 ..P WKT 2010 08 17 10 54 55 31.3200 -97.3300 251.000 30.0 118.131 4.170 -999.990 -999.990 1.181 ..P WKT 2010 08 17 10 59 55 31.3200 -97.3300 251.000 122.0 105.345 3.650 -999.990 -999.990 1.053 ..P WKT 2010 08 17 11 04 55 31.3200 -97.3300 251.000 457.0 113.843 3.780 -999.990 -999.990 1.138 ..P WKT 2010 08 17 11 09 55 31.3200 -97.3300 251.000 30.0 109.681 3.800 -999.990 -999.990 1.097 ..P WKT 2010 08 17 11 14 55 31.3200 -97.3300 251.000 122.0 104.545 4.740 -999.990 -999.990 1.045 ..P WKT 2010 08 17 11 19 55 31.3200 -97.3300 251.000 457.0 117.357 4.020 -999.990 -999.990 1.174 ..P WKT 2010 08 17 11 29 55 31.3200 -97.3300 251.000 30.0 115.068 4.160 -999.990 -999.990 1.151 ..P WKT 2010 08 17 11 34 55 31.3200 -97.3300 251.000 122.0 106.923 3.570 -999.990 -999.990 1.069 ..P WKT 2010 08 17 11 39 55 31.3200 -97.3300 251.000 457.0 119.231 3.300 -999.990 -999.990 1.192 ..P WKT 2010 08 17 11 44 55 31.3200 -97.3300 251.000 30.0 121.662 3.360 -999.990 -999.990 1.217 ..P WKT 2010 08 17 11 49 55 31.3200 -97.3300 251.000 122.0 119.360 3.190 -999.990 -999.990 1.194 ..P WKT 2010 08 17 12 09 55 31.3200 -97.3300 251.000 457.0 120.356 3.070 -999.990 -999.990 1.204 ..P WKT 2010 08 17 12 10 25 31.3200 -97.3300 251.000 457.0 120.637 2.920 -999.990 -999.990 1.206 ..P WKT 2010 08 17 12 10 55 31.3200 -97.3300 251.000 457.0 121.751 2.830 -999.990 -999.990 1.218 ..P WKT 2010 08 17 12 11 25 31.3200 -97.3300 251.000 457.0 119.248 2.760 -999.990 -999.990 1.192 ..P WKT 2010 08 17 12 11 55 31.3200 -97.3300 251.000 457.0 115.352 2.950 -999.990 -999.990 1.154 ..P WKT 2010 08 17 12 12 25 31.3200 -97.3300 251.000 457.0 115.911 3.320 -999.990 -999.990 1.159 ..P WKT 2010 08 17 12 12 55 31.3200 -97.3300 251.000 457.0 112.015 3.130 -999.990 -999.990 1.120 ..P WKT 2010 08 17 12 13 25 31.3200 -97.3300 251.000 457.0 111.739 3.120 -999.990 -999.990 1.117 ..P WKT 2010 08 17 12 13 55 31.3200 -97.3300 251.000 457.0 111.463 3.020 -999.990 -999.990 1.115 ..P WKT 2010 08 17 12 14 25 31.3200 -97.3300 251.000 457.0 115.917 2.950 -999.990 -999.990 1.159 ..P WKT 2010 08 17 12 14 55 31.3200 -97.3300 251.000 457.0 114.249 3.540 -999.990 -999.990 1.142 ..P WKT 2010 08 17 12 19 55 31.3200 -97.3300 251.000 30.0 123.728 3.550 -999.990 -999.990 1.237 ..P WKT 2010 08 17 12 24 55 31.3200 -97.3300 251.000 122.0 116.229 3.870 -999.990 -999.990 1.162 ..P WKT 2010 08 17 12 29 55 31.3200 -97.3300 251.000 457.0 116.801 3.510 -999.990 -999.990 1.168 ..P WKT 2010 08 17 12 34 55 31.3200 -97.3300 251.000 30.0 119.600 3.270 -999.990 -999.990 1.196 ..P WKT 2010 08 17 12 39 55 31.3200 -97.3300 251.000 122.0 134.645 5.220 -999.990 -999.990 1.346 ..P WKT 2010 08 17 12 44 55 31.3200 -97.3300 251.000 457.0 114.622 3.100 -999.990 -999.990 1.146 ..P WKT 2010 08 17 12 54 55 31.3200 -97.3300 251.000 30.0 133.349 3.970 -999.990 -999.990 1.333 ..P WKT 2010 08 17 12 59 55 31.3200 -97.3300 251.000 122.0 132.856 3.390 -999.990 -999.990 1.329 ..P WKT 2010 08 17 13 04 55 31.3200 -97.3300 251.000 457.0 119.563 4.580 -999.990 -999.990 1.196 ..P WKT 2010 08 17 13 09 55 31.3200 -97.3300 251.000 30.0 126.028 3.740 -999.990 -999.990 1.260 ..P WKT 2010 08 17 13 14 55 31.3200 -97.3300 251.000 122.0 136.667 3.530 -999.990 -999.990 1.367 ..P WKT 2010 08 17 13 19 55 31.3200 -97.3300 251.000 457.0 110.296 3.520 -999.990 -999.990 1.103 ..P WKT 2010 08 17 13 29 55 31.3200 -97.3300 251.000 30.0 132.765 6.220 -999.990 -999.990 1.328 ..P WKT 2010 08 17 13 34 55 31.3200 -97.3300 251.000 122.0 127.900 4.030 -999.990 -999.990 1.279 ..P WKT 2010 08 17 13 39 55 31.3200 -97.3300 251.000 457.0 115.522 3.110 -999.990 -999.990 1.155 ..P WKT 2010 08 17 13 44 55 31.3200 -97.3300 251.000 30.0 126.796 3.230 -999.990 -999.990 1.268 ..P WKT 2010 08 17 13 49 55 31.3200 -97.3300 251.000 122.0 124.992 4.230 -999.990 -999.990 1.250 ..P WKT 2010 08 17 13 54 55 31.3200 -97.3300 251.000 457.0 118.458 3.500 -999.990 -999.990 1.185 ..P WKT 2010 08 17 14 04 55 31.3200 -97.3300 251.000 30.0 122.959 3.280 -999.990 -999.990 1.230 ..P WKT 2010 08 17 14 09 55 31.3200 -97.3300 251.000 122.0 132.047 3.750 -999.990 -999.990 1.320 ..P WKT 2010 08 17 14 14 55 31.3200 -97.3300 251.000 457.0 129.587 3.700 -999.990 -999.990 1.296 ..P WKT 2010 08 17 14 19 55 31.3200 -97.3300 251.000 30.0 124.762 3.610 -999.990 -999.990 1.248 ..P WKT 2010 08 17 14 24 55 31.3200 -97.3300 251.000 122.0 139.552 4.080 -999.990 -999.990 1.396 ..P WKT 2010 08 17 14 29 55 31.3200 -97.3300 251.000 457.0 123.321 4.870 -999.990 -999.990 1.233 ..P WKT 2010 08 17 14 39 55 31.3200 -97.3300 251.000 30.0 118.681 4.130 -999.990 -999.990 1.187 ..P WKT 2010 08 17 14 44 55 31.3200 -97.3300 251.000 122.0 131.383 4.970 -999.990 -999.990 1.314 ..P WKT 2010 08 17 14 49 55 31.3200 -97.3300 251.000 457.0 124.333 4.270 -999.990 -999.990 1.243 ..P WKT 2010 08 17 14 54 55 31.3200 -97.3300 251.000 30.0 114.503 4.890 -999.990 -999.990 1.145 ..P WKT 2010 08 17 14 59 55 31.3200 -97.3300 251.000 122.0 128.178 4.660 -999.990 -999.990 1.282 ..P WKT 2010 08 17 15 04 55 31.3200 -97.3300 251.000 457.0 118.903 4.470 -999.990 -999.990 1.189 ..P WKT 2010 08 17 15 14 55 31.3200 -97.3300 251.000 30.0 117.026 3.840 -999.990 -999.990 1.170 ..P WKT 2010 08 17 15 19 55 31.3200 -97.3300 251.000 122.0 125.951 4.790 -999.990 -999.990 1.260 ..P WKT 2010 08 17 15 24 55 31.3200 -97.3300 251.000 457.0 128.201 5.140 -999.990 -999.990 1.282 ..P WKT 2010 08 17 15 29 55 31.3200 -97.3300 251.000 30.0 118.907 5.140 -999.990 -999.990 1.189 ..P WKT 2010 08 17 15 34 55 31.3200 -97.3300 251.000 122.0 126.859 5.340 -999.990 -999.990 1.269 ..P WKT 2010 08 17 15 39 55 31.3200 -97.3300 251.000 457.0 122.434 3.950 -999.990 -999.990 1.224 ..P WKT 2010 08 17 15 49 55 31.3200 -97.3300 251.000 30.0 120.178 3.840 -999.990 -999.990 1.202 ..P WKT 2010 08 17 15 54 55 31.3200 -97.3300 251.000 122.0 135.559 4.830 -999.990 -999.990 1.356 ..P WKT 2010 08 17 15 59 55 31.3200 -97.3300 251.000 457.0 122.016 5.830 -999.990 -999.990 1.220 ..P WKT 2010 08 17 16 04 55 31.3200 -97.3300 251.000 30.0 120.710 4.810 -999.990 -999.990 1.207 ..P WKT 2010 08 17 16 09 55 31.3200 -97.3300 251.000 122.0 128.302 5.120 -999.990 -999.990 1.283 ..P WKT 2010 08 17 16 14 55 31.3200 -97.3300 251.000 457.0 120.044 4.370 -999.990 -999.990 1.200 ..P WKT 2010 08 17 16 24 55 31.3200 -97.3300 251.000 30.0 123.053 3.790 -999.990 -999.990 1.231 ..P WKT 2010 08 17 16 29 55 31.3200 -97.3300 251.000 122.0 130.149 4.560 -999.990 -999.990 1.301 ..P WKT 2010 08 17 16 34 55 31.3200 -97.3300 251.000 457.0 120.560 4.760 -999.990 -999.990 1.206 ..P WKT 2010 08 17 16 39 55 31.3200 -97.3300 251.000 30.0 125.152 4.510 -999.990 -999.990 1.252 ..P WKT 2010 08 17 16 44 55 31.3200 -97.3300 251.000 122.0 133.082 4.530 -999.990 -999.990 1.331 ..P WKT 2010 08 17 16 49 55 31.3200 -97.3300 251.000 457.0 127.386 5.100 -999.990 -999.990 1.274 ..P WKT 2010 08 17 17 04 55 31.3200 -97.3300 251.000 30.0 128.751 4.620 -999.990 -999.990 1.288 ..P WKT 2010 08 17 17 09 55 31.3200 -97.3300 251.000 122.0 130.891 4.850 -999.990 -999.990 1.309 ..P WKT 2010 08 17 17 14 55 31.3200 -97.3300 251.000 457.0 124.133 4.480 -999.990 -999.990 1.241 ..P WKT 2010 08 17 17 19 55 31.3200 -97.3300 251.000 30.0 126.273 4.670 -999.990 -999.990 1.263 ..P WKT 2010 08 17 17 24 55 31.3200 -97.3300 251.000 122.0 134.530 4.770 -999.990 -999.990 1.345 ..P WKT 2010 08 17 17 29 55 31.3200 -97.3300 251.000 457.0 122.211 6.240 -999.990 -999.990 1.222 ..P WKT 2010 08 17 17 39 55 31.3200 -97.3300 251.000 30.0 126.242 4.640 -999.990 -999.990 1.262 ..P WKT 2010 08 17 17 44 55 31.3200 -97.3300 251.000 122.0 140.922 4.160 -999.990 -999.990 1.409 ..P WKT 2010 08 17 17 49 55 31.3200 -97.3300 251.000 457.0 130.024 5.020 -999.990 -999.990 1.300 ..P WKT 2010 08 17 17 54 55 31.3200 -97.3300 251.000 30.0 131.638 5.530 -999.990 -999.990 1.316 ..P WKT 2010 08 17 17 59 55 31.3200 -97.3300 251.000 122.0 132.277 4.150 -999.990 -999.990 1.323 ..P WKT 2010 08 17 18 04 55 31.3200 -97.3300 251.000 457.0 128.887 3.870 -999.990 -999.990 1.289 ..P WKT 2010 08 17 18 14 55 31.3200 -97.3300 251.000 30.0 128.042 4.170 -999.990 -999.990 1.280 ..P WKT 2010 08 17 18 19 55 31.3200 -97.3300 251.000 122.0 141.846 4.280 -999.990 -999.990 1.418 ..P WKT 2010 08 17 18 24 55 31.3200 -97.3300 251.000 457.0 129.799 4.230 -999.990 -999.990 1.298 ..P WKT 2010 08 17 18 29 55 31.3200 -97.3300 251.000 30.0 128.453 4.490 -999.990 -999.990 1.285 ..P WKT 2010 08 17 18 34 55 31.3200 -97.3300 251.000 122.0 139.338 4.130 -999.990 -999.990 1.393 ..P WKT 2010 08 17 18 39 55 31.3200 -97.3300 251.000 457.0 128.264 5.350 -999.990 -999.990 1.283 ..P WKT 2010 08 17 18 49 55 31.3200 -97.3300 251.000 30.0 123.648 4.730 -999.990 -999.990 1.236 ..P WKT 2010 08 17 18 54 55 31.3200 -97.3300 251.000 122.0 138.582 4.390 -999.990 -999.990 1.386 ..P WKT 2010 08 17 18 59 55 31.3200 -97.3300 251.000 457.0 130.308 5.470 -999.990 -999.990 1.303 ..P WKT 2010 08 17 19 04 55 31.3200 -97.3300 251.000 30.0 126.759 4.500 -999.990 -999.990 1.268 ..P WKT 2010 08 17 19 09 55 31.3200 -97.3300 251.000 122.0 138.357 5.010 -999.990 -999.990 1.384 ..P WKT 2010 08 17 19 14 55 31.3200 -97.3300 251.000 457.0 130.918 4.780 -999.990 -999.990 1.309 ..P WKT 2010 08 17 19 24 55 31.3200 -97.3300 251.000 30.0 121.319 4.540 -999.990 -999.990 1.213 ..P WKT 2010 08 17 19 29 55 31.3200 -97.3300 251.000 122.0 135.000 4.500 -999.990 -999.990 1.350 ..P WKT 2010 08 17 19 34 55 31.3200 -97.3300 251.000 457.0 127.561 4.670 -999.990 -999.990 1.276 ..P WKT 2010 08 17 19 39 55 31.3200 -97.3300 251.000 30.0 122.206 4.340 -999.990 -999.990 1.222 ..P WKT 2010 08 17 19 44 55 31.3200 -97.3300 251.000 122.0 140.473 4.720 -999.990 -999.990 1.405 ..P WKT 2010 08 17 19 49 55 31.3200 -97.3300 251.000 457.0 130.671 4.270 -999.990 -999.990 1.307 ..P WKT 2010 08 17 19 59 55 31.3200 -97.3300 251.000 30.0 126.929 4.450 -999.990 -999.990 1.269 ..P WKT 2010 08 17 20 04 55 31.3200 -97.3300 251.000 122.0 140.768 4.470 -999.990 -999.990 1.408 ..P WKT 2010 08 17 20 09 55 31.3200 -97.3300 251.000 457.0 128.765 4.360 -999.990 -999.990 1.288 ..P WKT 2010 08 17 20 14 55 31.3200 -97.3300 251.000 30.0 135.379 4.390 -999.990 -999.990 1.354 ..P WKT 2010 08 17 20 19 55 31.3200 -97.3300 251.000 122.0 138.380 4.950 -999.990 -999.990 1.384 ..P WKT 2010 08 17 20 24 55 31.3200 -97.3300 251.000 457.0 130.823 5.840 -999.990 -999.990 1.308 ..P WKT 2010 08 17 20 34 55 31.3200 -97.3300 251.000 30.0 123.133 5.280 -999.990 -999.990 1.231 ..P WKT 2010 08 17 20 39 55 31.3200 -97.3300 251.000 122.0 142.725 4.960 -999.990 -999.990 1.427 ..P WKT 2010 08 17 20 44 55 31.3200 -97.3300 251.000 457.0 131.755 6.120 -999.990 -999.990 1.318 ..P WKT 2010 08 17 20 49 55 31.3200 -97.3300 251.000 30.0 132.176 4.950 -999.990 -999.990 1.322 ..P WKT 2010 08 17 20 54 55 31.3200 -97.3300 251.000 122.0 138.432 5.050 -999.990 -999.990 1.384 ..P WKT 2010 08 17 20 59 55 31.3200 -97.3300 251.000 457.0 134.130 6.320 -999.990 -999.990 1.341 ..P WKT 2010 08 17 21 09 55 31.3200 -97.3300 251.000 30.0 134.457 5.030 -999.990 -999.990 1.345 ..P WKT 2010 08 17 21 14 55 31.3200 -97.3300 251.000 122.0 142.696 5.290 -999.990 -999.990 1.427 ..P WKT 2010 08 17 21 19 55 31.3200 -97.3300 251.000 457.0 133.990 4.890 -999.990 -999.990 1.340 ..P WKT 2010 08 17 21 24 55 31.3200 -97.3300 251.000 30.0 132.784 5.930 -999.990 -999.990 1.328 ..P WKT 2010 08 17 21 29 55 31.3200 -97.3300 251.000 122.0 143.801 4.790 -999.990 -999.990 1.438 ..P WKT 2010 08 17 21 34 55 31.3200 -97.3300 251.000 457.0 127.595 4.640 -999.990 -999.990 1.276 ..P WKT 2010 08 17 21 44 55 31.3200 -97.3300 251.000 30.0 132.743 4.410 -999.990 -999.990 1.327 ..P WKT 2010 08 17 21 49 55 31.3200 -97.3300 251.000 122.0 145.624 5.120 -999.990 -999.990 1.456 ..P WKT 2010 08 17 21 54 55 31.3200 -97.3300 251.000 457.0 135.172 4.470 -999.990 -999.990 1.352 ..P WKT 2010 08 17 21 59 55 31.3200 -97.3300 251.000 30.0 129.999 4.310 -999.990 -999.990 1.300 ..P WKT 2010 08 17 22 04 55 31.3200 -97.3300 251.000 122.0 147.739 5.370 -999.990 -999.990 1.477 ..P WKT 2010 08 17 22 09 55 31.3200 -97.3300 251.000 457.0 137.289 5.760 -999.990 -999.990 1.373 ..P WKT 2010 08 17 22 19 55 31.3200 -97.3300 251.000 30.0 124.344 4.390 -999.990 -999.990 1.243 ..P WKT 2010 08 17 22 24 55 31.3200 -97.3300 251.000 122.0 134.208 4.510 -999.990 -999.990 1.342 ..P WKT 2010 08 17 22 29 55 31.3200 -97.3300 251.000 457.0 126.437 4.500 -999.990 -999.990 1.264 ..P WKT 2010 08 17 22 34 55 31.3200 -97.3300 251.000 30.0 129.357 4.940 -999.990 -999.990 1.294 ..P WKT 2010 08 17 22 39 55 31.3200 -97.3300 251.000 122.0 133.944 5.270 -999.990 -999.990 1.339 ..P WKT 2010 08 17 22 44 55 31.3200 -97.3300 251.000 457.0 132.560 4.790 -999.990 -999.990 1.326 ..P WKT 2010 08 17 22 54 55 31.3200 -97.3300 251.000 30.0 126.619 4.670 -999.990 -999.990 1.266 ..P WKT 2010 08 17 22 59 55 31.3200 -97.3300 251.000 122.0 135.251 4.590 -999.990 -999.990 1.353 ..P WKT 2010 08 17 23 04 55 31.3200 -97.3300 251.000 457.0 131.944 5.090 -999.990 -999.990 1.319 ..P WKT 2010 08 17 23 09 55 31.3200 -97.3300 251.000 30.0 129.192 4.880 -999.990 -999.990 1.292 ..P WKT 2010 08 17 23 14 55 31.3200 -97.3300 251.000 122.0 143.515 4.680 -999.990 -999.990 1.435 ..P WKT 2010 08 17 23 19 55 31.3200 -97.3300 251.000 457.0 137.570 4.410 -999.990 -999.990 1.376 ..P WKT 2010 08 17 23 29 55 31.3200 -97.3300 251.000 30.0 131.592 4.530 -999.990 -999.990 1.316 ..P WKT 2010 08 17 23 34 55 31.3200 -97.3300 251.000 122.0 138.779 4.970 -999.990 -999.990 1.388 ..P WKT 2010 08 17 23 39 55 31.3200 -97.3300 251.000 457.0 132.083 5.170 -999.990 -999.990 1.321 ..P WKT 2010 08 17 23 44 55 31.3200 -97.3300 251.000 30.0 128.858 4.920 -999.990 -999.990 1.289 ..P WKT 2010 08 17 23 49 55 31.3200 -97.3300 251.000 122.0 144.788 4.630 -999.990 -999.990 1.448 ..P WKT 2010 08 18 00 09 55 31.3200 -97.3300 251.000 457.0 134.864 5.250 -999.990 -999.990 1.349 ..P WKT 2010 08 18 00 10 25 31.3200 -97.3300 251.000 457.0 139.027 4.710 -999.990 -999.990 1.390 ..P WKT 2010 08 18 00 10 55 31.3200 -97.3300 251.000 457.0 135.697 4.840 -999.990 -999.990 1.357 ..P WKT 2010 08 18 00 11 25 31.3200 -97.3300 251.000 457.0 137.639 4.570 -999.990 -999.990 1.376 ..P WKT 2010 08 18 00 11 55 31.3200 -97.3300 251.000 457.0 137.639 4.610 -999.990 -999.990 1.376 ..P WKT 2010 08 18 00 12 25 31.3200 -97.3300 251.000 457.0 136.529 4.540 -999.990 -999.990 1.365 ..P WKT 2010 08 18 00 12 55 31.3200 -97.3300 251.000 457.0 135.140 4.750 -999.990 -999.990 1.351 ..P WKT 2010 08 18 00 13 25 31.3200 -97.3300 251.000 457.0 137.916 4.560 -999.990 -999.990 1.379 ..P WKT 2010 08 18 00 13 55 31.3200 -97.3300 251.000 457.0 141.246 4.620 -999.990 -999.990 1.412 ..P WKT 2010 08 18 00 14 25 31.3200 -97.3300 251.000 457.0 138.470 4.710 -999.990 -999.990 1.385 ..P WKT 2010 08 18 00 14 55 31.3200 -97.3300 251.000 457.0 134.030 5.100 -999.990 -999.990 1.340 ..P WKT 2010 08 18 00 19 55 31.3200 -97.3300 251.000 30.0 132.918 4.470 -999.990 -999.990 1.329 ..P WKT 2010 08 18 00 24 55 31.3200 -97.3300 251.000 122.0 145.403 4.540 -999.990 -999.990 1.454 ..P WKT 2010 08 18 00 29 55 31.3200 -97.3300 251.000 457.0 138.186 4.590 -999.990 -999.990 1.382 ..P WKT 2010 08 18 00 34 55 31.3200 -97.3300 251.000 30.0 136.520 4.770 -999.990 -999.990 1.365 ..P WKT 2010 08 18 00 39 55 31.3200 -97.3300 251.000 122.0 138.459 4.520 -999.990 -999.990 1.385 ..P WKT 2010 08 18 00 44 55 31.3200 -97.3300 251.000 457.0 134.574 5.210 -999.990 -999.990 1.346 ..P WKT 2010 08 18 00 54 55 31.3200 -97.3300 251.000 30.0 128.985 4.660 -999.990 -999.990 1.290 ..P WKT 2010 08 18 00 59 55 31.3200 -97.3300 251.000 122.0 140.867 4.970 -999.990 -999.990 1.409 ..P WKT 2010 08 18 01 04 55 31.3200 -97.3300 251.000 457.0 134.448 5.600 -999.990 -999.990 1.344 ..P WKT 2010 08 18 01 09 55 31.3200 -97.3300 251.000 30.0 141.615 5.690 -999.990 -999.990 1.416 ..P WKT 2010 08 18 01 14 55 31.3200 -97.3300 251.000 122.0 139.078 4.650 -999.990 -999.990 1.391 ..P WKT 2010 08 18 01 19 55 31.3200 -97.3300 251.000 457.0 130.167 4.400 -999.990 -999.990 1.302 ..P WKT 2010 08 18 01 29 55 31.3200 -97.3300 251.000 30.0 141.406 4.590 -999.990 -999.990 1.414 ..P WKT 2010 08 18 01 34 55 31.3200 -97.3300 251.000 122.0 140.771 4.590 -999.990 -999.990 1.408 ..P WKT 2010 08 18 01 39 55 31.3200 -97.3300 251.000 457.0 139.720 4.960 -999.990 -999.990 1.397 ..P WKT 2010 08 18 01 44 55 31.3200 -97.3300 251.000 30.0 141.300 4.920 -999.990 -999.990 1.413 ..P WKT 2010 08 18 01 49 55 31.3200 -97.3300 251.000 122.0 142.327 4.970 -999.990 -999.990 1.423 ..P WKT 2010 08 18 01 54 55 31.3200 -97.3300 251.000 457.0 137.398 4.950 -999.990 -999.990 1.374 ..P WKT 2010 08 18 02 04 55 31.3200 -97.3300 251.000 30.0 143.506 5.150 -999.990 -999.990 1.435 ..P WKT 2010 08 18 02 09 55 31.3200 -97.3300 251.000 122.0 146.094 5.340 -999.990 -999.990 1.461 ..P WKT 2010 08 18 02 14 55 31.3200 -97.3300 251.000 457.0 139.684 5.140 -999.990 -999.990 1.397 ..P WKT 2010 08 18 02 19 55 31.3200 -97.3300 251.000 30.0 135.351 4.810 -999.990 -999.990 1.354 ..P WKT 2010 08 18 02 24 55 31.3200 -97.3300 251.000 122.0 144.860 5.610 -999.990 -999.990 1.449 ..P WKT 2010 08 18 02 29 55 31.3200 -97.3300 251.000 457.0 130.563 4.730 -999.990 -999.990 1.306 ..P WKT 2010 08 18 02 39 55 31.3200 -97.3300 251.000 30.0 139.969 5.120 -999.990 -999.990 1.400 ..P WKT 2010 08 18 02 44 55 31.3200 -97.3300 251.000 122.0 143.603 5.430 -999.990 -999.990 1.436 ..P WKT 2010 08 18 02 49 55 31.3200 -97.3300 251.000 457.0 131.328 4.840 -999.990 -999.990 1.313 ..P WKT 2010 08 18 02 54 55 31.3200 -97.3300 251.000 30.0 132.611 4.960 -999.990 -999.990 1.326 ..P WKT 2010 08 18 02 59 55 31.3200 -97.3300 251.000 122.0 145.651 4.820 -999.990 -999.990 1.457 ..P WKT 2010 08 18 03 04 55 31.3200 -97.3300 251.000 457.0 137.804 4.730 -999.990 -999.990 1.378 ..P WKT 2010 08 18 03 14 55 31.3200 -97.3300 251.000 30.0 141.731 4.480 -999.990 -999.990 1.417 ..P WKT 2010 08 18 03 19 55 31.3200 -97.3300 251.000 122.0 146.172 4.980 -999.990 -999.990 1.462 ..P WKT 2010 08 18 03 24 55 31.3200 -97.3300 251.000 457.0 143.977 5.030 -999.990 -999.990 1.440 ..P WKT 2010 08 18 03 29 55 31.3200 -97.3300 251.000 30.0 141.921 4.170 -999.990 -999.990 1.419 ..P WKT 2010 08 18 03 34 55 31.3200 -97.3300 251.000 122.0 143.872 4.460 -999.990 -999.990 1.439 ..P WKT 2010 08 18 03 39 55 31.3200 -97.3300 251.000 457.0 148.865 4.200 -999.990 -999.990 1.489 ..P WKT 2010 08 18 03 49 55 31.3200 -97.3300 251.000 30.0 146.865 4.190 -999.990 -999.990 1.469 ..P WKT 2010 08 18 03 54 55 31.3200 -97.3300 251.000 122.0 142.362 4.060 -999.990 -999.990 1.424 ..P WKT 2010 08 18 03 59 55 31.3200 -97.3300 251.000 457.0 150.293 5.160 -999.990 -999.990 1.503 ..P WKT 2010 08 18 04 04 55 31.3200 -97.3300 251.000 30.0 140.817 4.530 -999.990 -999.990 1.408 ..P WKT 2010 08 18 04 09 55 31.3200 -97.3300 251.000 122.0 144.328 4.610 -999.990 -999.990 1.443 ..P WKT 2010 08 18 04 14 55 31.3200 -97.3300 251.000 457.0 147.836 4.670 -999.990 -999.990 1.478 ..P WKT 2010 08 18 04 24 55 31.3200 -97.3300 251.000 30.0 145.463 4.340 -999.990 -999.990 1.455 ..P WKT 2010 08 18 04 29 55 31.3200 -97.3300 251.000 122.0 144.000 4.310 -999.990 -999.990 1.440 ..P WKT 2010 08 18 04 34 55 31.3200 -97.3300 251.000 457.0 152.755 4.520 -999.990 -999.990 1.528 ..P WKT 2010 08 18 04 39 55 31.3200 -97.3300 251.000 30.0 138.039 5.190 -999.990 -999.990 1.380 ..P WKT 2010 08 18 04 44 55 31.3200 -97.3300 251.000 122.0 143.204 5.480 -999.990 -999.990 1.432 ..P WKT 2010 08 18 04 49 55 31.3200 -97.3300 251.000 457.0 142.018 4.010 -999.990 -999.990 1.420 ..P WKT 2010 08 18 05 04 55 31.3200 -97.3300 251.000 30.0 135.136 4.340 -999.990 -999.990 1.351 ..P WKT 2010 08 18 05 09 55 31.3200 -97.3300 251.000 122.0 138.084 4.810 -999.990 -999.990 1.381 ..P WKT 2010 08 18 05 14 55 31.3200 -97.3300 251.000 457.0 136.616 4.990 -999.990 -999.990 1.366 ..P WKT 2010 08 18 05 19 55 31.3200 -97.3300 251.000 30.0 153.356 4.740 -999.990 -999.990 1.534 ..P WKT 2010 08 18 05 24 55 31.3200 -97.3300 251.000 122.0 148.301 6.000 -999.990 -999.990 1.483 ..P WKT 2010 08 18 05 29 55 31.3200 -97.3300 251.000 457.0 143.523 4.580 -999.990 -999.990 1.435 ..P WKT 2010 08 18 05 39 55 31.3200 -97.3300 251.000 30.0 145.834 5.660 -999.990 -999.990 1.458 ..P WKT 2010 08 18 05 44 55 31.3200 -97.3300 251.000 122.0 142.306 5.520 -999.990 -999.990 1.423 ..P WKT 2010 08 18 05 49 55 31.3200 -97.3300 251.000 457.0 148.841 4.980 -999.990 -999.990 1.488 ..P WKT 2010 08 18 05 54 55 31.3200 -97.3300 251.000 30.0 145.452 4.950 -999.990 -999.990 1.455 ..P WKT 2010 08 18 05 59 55 31.3200 -97.3300 251.000 122.0 148.126 5.320 -999.990 -999.990 1.481 ..P WKT 2010 08 18 06 04 55 31.3200 -97.3300 251.000 457.0 167.889 4.810 -999.990 -999.990 1.679 ..P WKT 2010 08 18 06 14 55 31.3200 -97.3300 251.000 30.0 146.148 5.160 -999.990 -999.990 1.461 ..P WKT 2010 08 18 06 19 55 31.3200 -97.3300 251.000 122.0 148.606 4.620 -999.990 -999.990 1.486 ..P WKT 2010 08 18 06 24 55 31.3200 -97.3300 251.000 457.0 142.384 5.950 -999.990 -999.990 1.424 ..P WKT 2010 08 18 06 29 55 31.3200 -97.3300 251.000 30.0 148.836 4.750 -999.990 -999.990 1.488 ..P WKT 2010 08 18 06 34 55 31.3200 -97.3300 251.000 122.0 143.165 3.800 -999.990 -999.990 1.432 ..P WKT 2010 08 18 06 39 55 31.3200 -97.3300 251.000 457.0 141.904 4.180 -999.990 -999.990 1.419 ..P WKT 2010 08 18 06 49 55 31.3200 -97.3300 251.000 30.0 141.939 4.030 -999.990 -999.990 1.419 ..P WKT 2010 08 18 06 54 55 31.3200 -97.3300 251.000 122.0 141.444 3.990 -999.990 -999.990 1.414 ..P WKT 2010 08 18 06 59 55 31.3200 -97.3300 251.000 457.0 143.015 3.980 -999.990 -999.990 1.430 ..P WKT 2010 08 18 07 04 55 31.3200 -97.3300 251.000 30.0 144.173 4.450 -999.990 -999.990 1.442 ..P WKT 2010 08 18 07 09 55 31.3200 -97.3300 251.000 122.0 139.136 4.230 -999.990 -999.990 1.391 ..P WKT 2010 08 18 07 14 55 31.3200 -97.3300 251.000 457.0 143.184 3.710 -999.990 -999.990 1.432 ..P WKT 2010 08 18 07 24 55 31.3200 -97.3300 251.000 30.0 145.597 3.710 -999.990 -999.990 1.456 ..P WKT 2010 08 18 07 29 55 31.3200 -97.3300 251.000 122.0 147.677 4.520 -999.990 -999.990 1.477 ..P WKT 2010 08 18 07 34 55 31.3200 -97.3300 251.000 457.0 136.551 4.720 -999.990 -999.990 1.366 ..P WKT 2010 08 18 07 39 55 31.3200 -97.3300 251.000 30.0 149.223 4.470 -999.990 -999.990 1.492 ..P WKT 2010 08 18 07 44 55 31.3200 -97.3300 251.000 122.0 141.263 4.170 -999.990 -999.990 1.413 ..P WKT 2010 08 18 07 49 55 31.3200 -97.3300 251.000 457.0 142.655 4.260 -999.990 -999.990 1.427 ..P WKT 2010 08 18 07 59 55 31.3200 -97.3300 251.000 30.0 146.245 3.870 -999.990 -999.990 1.462 ..P WKT 2010 08 18 08 04 55 31.3200 -97.3300 251.000 122.0 136.618 5.500 -999.990 -999.990 1.366 ..P WKT 2010 08 18 08 09 55 31.3200 -97.3300 251.000 457.0 136.616 4.520 -999.990 -999.990 1.366 ..P WKT 2010 08 18 08 14 55 31.3200 -97.3300 251.000 30.0 143.762 4.310 -999.990 -999.990 1.438 ..P WKT 2010 08 18 08 19 55 31.3200 -97.3300 251.000 122.0 146.783 4.630 -999.990 -999.990 1.468 ..P WKT 2010 08 18 08 24 55 31.3200 -97.3300 251.000 457.0 131.937 4.280 -999.990 -999.990 1.319 ..P WKT 2010 08 18 08 34 55 31.3200 -97.3300 251.000 30.0 136.527 3.460 -999.990 -999.990 1.365 ..P WKT 2010 08 18 08 39 55 31.3200 -97.3300 251.000 122.0 154.858 4.400 -999.990 -999.990 1.549 ..P WKT 2010 08 18 08 44 55 31.3200 -97.3300 251.000 457.0 131.696 3.760 -999.990 -999.990 1.317 ..P WKT 2010 08 18 08 49 55 31.3200 -97.3300 251.000 30.0 151.671 4.030 -999.990 -999.990 1.517 ..P WKT 2010 08 18 08 54 55 31.3200 -97.3300 251.000 122.0 158.182 3.750 -999.990 -999.990 1.582 ..P WKT 2010 08 18 08 59 55 31.3200 -97.3300 251.000 457.0 140.795 3.430 -999.990 -999.990 1.408 ..P WKT 2010 08 18 09 09 55 31.3200 -97.3300 251.000 30.0 147.439 3.350 -999.990 -999.990 1.474 ..P WKT 2010 08 18 09 14 55 31.3200 -97.3300 251.000 122.0 175.033 3.450 -999.990 -999.990 1.750 ..P WKT 2010 08 18 09 19 55 31.3200 -97.3300 251.000 457.0 131.235 3.380 -999.990 -999.990 1.312 ..P WKT 2010 08 18 09 24 55 31.3200 -97.3300 251.000 30.0 155.255 3.970 -999.990 -999.990 1.553 ..P WKT 2010 08 18 09 29 55 31.3200 -97.3300 251.000 122.0 145.507 4.150 -999.990 -999.990 1.455 ..P WKT 2010 08 18 09 34 55 31.3200 -97.3300 251.000 457.0 135.485 3.460 -999.990 -999.990 1.355 ..P WKT 2010 08 18 09 44 55 31.3200 -97.3300 251.000 30.0 157.847 4.910 -999.990 -999.990 1.578 ..P WKT 2010 08 18 09 49 55 31.3200 -97.3300 251.000 122.0 141.928 4.350 -999.990 -999.990 1.419 ..P WKT 2010 08 18 09 54 55 31.3200 -97.3300 251.000 457.0 123.542 3.970 -999.990 -999.990 1.235 ..P WKT 2010 08 18 09 59 55 31.3200 -97.3300 251.000 30.0 152.623 4.590 -999.990 -999.990 1.526 ..P WKT 2010 08 18 10 04 55 31.3200 -97.3300 251.000 122.0 132.868 3.860 -999.990 -999.990 1.329 ..P WKT 2010 08 18 10 09 55 31.3200 -97.3300 251.000 457.0 137.392 3.520 -999.990 -999.990 1.374 ..P WKT 2010 08 18 10 19 55 31.3200 -97.3300 251.000 30.0 162.618 3.680 -999.990 -999.990 1.626 ..P WKT 2010 08 18 10 24 55 31.3200 -97.3300 251.000 122.0 133.822 3.730 -999.990 -999.990 1.338 ..P WKT 2010 08 18 10 29 55 31.3200 -97.3300 251.000 457.0 127.788 4.600 -999.990 -999.990 1.278 ..P WKT 2010 08 18 10 34 55 31.3200 -97.3300 251.000 30.0 151.912 4.180 -999.990 -999.990 1.519 ..P WKT 2010 08 18 10 39 55 31.3200 -97.3300 251.000 122.0 131.486 3.360 -999.990 -999.990 1.315 ..P WKT 2010 08 18 10 44 55 31.3200 -97.3300 251.000 457.0 125.043 3.590 -999.990 -999.990 1.250 ..P WKT 2010 08 18 10 54 55 31.3200 -97.3300 251.000 30.0 151.859 3.430 -999.990 -999.990 1.519 ..P WKT 2010 08 18 10 59 55 31.3200 -97.3300 251.000 122.0 136.745 3.710 -999.990 -999.990 1.367 ..P WKT 2010 08 18 11 04 55 31.3200 -97.3300 251.000 457.0 128.485 4.280 -999.990 -999.990 1.285 ..P WKT 2010 08 18 11 09 55 31.3200 -97.3300 251.000 30.0 144.882 4.070 -999.990 -999.990 1.449 ..P WKT 2010 08 18 11 14 55 31.3200 -97.3300 251.000 122.0 128.951 3.770 -999.990 -999.990 1.290 ..P WKT 2010 08 18 11 19 55 31.3200 -97.3300 251.000 457.0 124.118 3.640 -999.990 -999.990 1.241 ..P WKT 2010 08 18 11 29 55 31.3200 -97.3300 251.000 30.0 148.125 3.700 -999.990 -999.990 1.481 ..P WKT 2010 08 18 11 34 55 31.3200 -97.3300 251.000 122.0 124.795 3.720 -999.990 -999.990 1.248 ..P WKT 2010 08 18 11 39 55 31.3200 -97.3300 251.000 457.0 127.892 4.240 -999.990 -999.990 1.279 ..P WKT 2010 08 18 11 44 55 31.3200 -97.3300 251.000 30.0 137.285 4.680 -999.990 -999.990 1.373 ..P WKT 2010 08 18 11 49 55 31.3200 -97.3300 251.000 122.0 125.050 4.560 -999.990 -999.990 1.250 ..P WKT 2010 08 18 12 09 55 31.3200 -97.3300 251.000 457.0 131.139 3.350 -999.990 -999.990 1.311 ..P WKT 2010 08 18 12 10 25 31.3200 -97.3300 251.000 457.0 132.158 3.810 -999.990 -999.990 1.322 ..P WKT 2010 08 18 12 10 55 31.3200 -97.3300 251.000 457.0 133.723 4.090 -999.990 -999.990 1.337 ..P WKT 2010 08 18 12 11 25 31.3200 -97.3300 251.000 457.0 127.898 3.540 -999.990 -999.990 1.279 ..P WKT 2010 08 18 12 11 55 31.3200 -97.3300 251.000 457.0 125.905 3.570 -999.990 -999.990 1.259 ..P WKT 2010 08 18 12 12 25 31.3200 -97.3300 251.000 457.0 125.555 3.770 -999.990 -999.990 1.256 ..P WKT 2010 08 18 12 12 55 31.3200 -97.3300 251.000 457.0 132.322 4.010 -999.990 -999.990 1.323 ..P WKT 2010 08 18 12 13 25 31.3200 -97.3300 251.000 457.0 124.854 3.920 -999.990 -999.990 1.249 ..P WKT 2010 08 18 12 13 55 31.3200 -97.3300 251.000 457.0 127.515 3.950 -999.990 -999.990 1.275 ..P WKT 2010 08 18 12 14 25 31.3200 -97.3300 251.000 457.0 132.092 3.890 -999.990 -999.990 1.321 ..P WKT 2010 08 18 12 14 55 31.3200 -97.3300 251.000 457.0 129.552 3.770 -999.990 -999.990 1.296 ..P WKT 2010 08 18 12 19 55 31.3200 -97.3300 251.000 30.0 140.011 4.340 -999.990 -999.990 1.400 ..P WKT 2010 08 18 12 24 55 31.3200 -97.3300 251.000 122.0 127.197 4.660 -999.990 -999.990 1.272 ..P WKT 2010 08 18 12 29 55 31.3200 -97.3300 251.000 457.0 126.157 4.010 -999.990 -999.990 1.262 ..P WKT 2010 08 18 12 34 55 31.3200 -97.3300 251.000 30.0 138.809 3.520 -999.990 -999.990 1.388 ..P WKT 2010 08 18 12 39 55 31.3200 -97.3300 251.000 122.0 130.374 3.520 -999.990 -999.990 1.304 ..P WKT 2010 08 18 12 44 55 31.3200 -97.3300 251.000 457.0 119.198 3.610 -999.990 -999.990 1.192 ..P WKT 2010 08 18 12 54 55 31.3200 -97.3300 251.000 30.0 141.194 4.640 -999.990 -999.990 1.412 ..P WKT 2010 08 18 12 59 55 31.3200 -97.3300 251.000 122.0 119.847 3.820 -999.990 -999.990 1.198 ..P WKT 2010 08 18 13 04 55 31.3200 -97.3300 251.000 457.0 124.529 3.900 -999.990 -999.990 1.245 ..P WKT 2010 08 18 13 09 55 31.3200 -97.3300 251.000 30.0 138.804 4.580 -999.990 -999.990 1.388 ..P WKT 2010 08 18 13 14 55 31.3200 -97.3300 251.000 122.0 133.896 4.770 -999.990 -999.990 1.339 ..P WKT 2010 08 18 13 19 55 31.3200 -97.3300 251.000 457.0 119.666 3.270 -999.990 -999.990 1.197 ..P WKT 2010 08 18 13 29 55 31.3200 -97.3300 251.000 30.0 136.634 2.890 -999.990 -999.990 1.366 ..P WKT 2010 08 18 13 34 55 31.3200 -97.3300 251.000 122.0 136.033 3.490 -999.990 -999.990 1.360 ..P WKT 2010 08 18 13 39 55 31.3200 -97.3300 251.000 457.0 127.341 3.850 -999.990 -999.990 1.273 ..P WKT 2010 08 18 13 44 55 31.3200 -97.3300 251.000 30.0 142.371 4.740 -999.990 -999.990 1.424 ..P WKT 2010 08 18 13 49 55 31.3200 -97.3300 251.000 122.0 132.993 4.720 -999.990 -999.990 1.330 ..P WKT 2010 08 18 13 54 55 31.3200 -97.3300 251.000 457.0 117.441 2.980 -999.990 -999.990 1.174 ..P WKT 2010 08 18 14 04 55 31.3200 -97.3300 251.000 30.0 132.911 4.990 -999.990 -999.990 1.329 ..P WKT 2010 08 18 14 09 55 31.3200 -97.3300 251.000 122.0 138.972 3.950 -999.990 -999.990 1.390 ..P WKT 2010 08 18 14 14 55 31.3200 -97.3300 251.000 457.0 113.066 5.470 -999.990 -999.990 1.131 ..P WKT 2010 08 18 14 19 55 31.3200 -97.3300 251.000 30.0 129.281 5.650 -999.990 -999.990 1.293 ..P WKT 2010 08 18 14 24 55 31.3200 -97.3300 251.000 122.0 132.873 4.610 -999.990 -999.990 1.329 ..P WKT 2010 08 18 14 29 55 31.3200 -97.3300 251.000 457.0 113.684 4.160 -999.990 -999.990 1.137 ..P WKT 2010 08 18 14 39 55 31.3200 -97.3300 251.000 30.0 123.515 3.660 -999.990 -999.990 1.235 ..P WKT 2010 08 18 14 44 55 31.3200 -97.3300 251.000 122.0 130.855 4.670 -999.990 -999.990 1.309 ..P WKT 2010 08 18 14 49 55 31.3200 -97.3300 251.000 457.0 110.187 5.800 -999.990 -999.990 1.102 ..P WKT 2010 08 18 14 54 55 31.3200 -97.3300 251.000 30.0 122.606 4.600 -999.990 -999.990 1.226 ..P WKT 2010 08 18 14 59 55 31.3200 -97.3300 251.000 122.0 134.205 3.900 -999.990 -999.990 1.342 ..P WKT 2010 08 18 15 04 55 31.3200 -97.3300 251.000 457.0 120.535 4.350 -999.990 -999.990 1.205 ..P WKT 2010 08 18 15 14 55 31.3200 -97.3300 251.000 30.0 118.758 4.230 -999.990 -999.990 1.188 ..P WKT 2010 08 18 15 19 55 31.3200 -97.3300 251.000 122.0 130.242 3.920 -999.990 -999.990 1.302 ..P WKT 2010 08 18 15 24 55 31.3200 -97.3300 251.000 457.0 127.716 4.770 -999.990 -999.990 1.277 ..P WKT 2010 08 18 15 29 55 31.3200 -97.3300 251.000 30.0 119.005 4.000 -999.990 -999.990 1.190 ..P WKT 2010 08 18 15 34 55 31.3200 -97.3300 251.000 122.0 129.256 3.940 -999.990 -999.990 1.293 ..P WKT 2010 08 18 15 39 55 31.3200 -97.3300 251.000 457.0 127.965 3.360 -999.990 -999.990 1.280 ..P WKT 2010 08 18 15 49 55 31.3200 -97.3300 251.000 30.0 117.666 3.400 -999.990 -999.990 1.177 ..P WKT 2010 08 18 15 54 55 31.3200 -97.3300 251.000 122.0 133.400 3.160 -999.990 -999.990 1.334 ..P WKT 2010 08 18 15 59 55 31.3200 -97.3300 251.000 457.0 126.865 3.250 -999.990 -999.990 1.269 ..P WKT 2010 08 18 16 04 55 31.3200 -97.3300 251.000 30.0 123.629 4.470 -999.990 -999.990 1.236 ..P WKT 2010 08 18 16 09 55 31.3200 -97.3300 251.000 122.0 128.643 3.320 -999.990 -999.990 1.286 ..P WKT 2010 08 18 16 14 55 31.3200 -97.3300 251.000 457.0 137.507 3.350 -999.990 -999.990 1.375 ..P WKT 2010 08 18 16 24 55 31.3200 -97.3300 251.000 30.0 125.965 3.450 -999.990 -999.990 1.260 ..P WKT 2010 08 18 16 29 55 31.3200 -97.3300 251.000 122.0 135.815 3.460 -999.990 -999.990 1.358 ..P WKT 2010 08 18 16 34 55 31.3200 -97.3300 251.000 457.0 123.930 3.510 -999.990 -999.990 1.239 ..P WKT 2010 08 18 16 39 55 31.3200 -97.3300 251.000 30.0 130.755 3.900 -999.990 -999.990 1.308 ..P WKT 2010 08 18 16 44 55 31.3200 -97.3300 251.000 122.0 140.608 5.630 -999.990 -999.990 1.406 ..P WKT 2010 08 18 16 49 55 31.3200 -97.3300 251.000 457.0 128.996 3.010 -999.990 -999.990 1.290 ..P WKT 2010 08 18 17 04 55 31.3200 -97.3300 251.000 30.0 129.748 3.590 -999.990 -999.990 1.297 ..P WKT 2010 08 18 17 09 55 31.3200 -97.3300 251.000 122.0 143.230 3.410 -999.990 -999.990 1.432 ..P WKT 2010 08 18 17 14 55 31.3200 -97.3300 251.000 457.0 137.163 3.400 -999.990 -999.990 1.372 ..P WKT 2010 08 18 17 19 55 31.3200 -97.3300 251.000 30.0 134.125 2.820 -999.990 -999.990 1.341 ..P WKT 2010 08 18 17 24 55 31.3200 -97.3300 251.000 122.0 148.437 2.520 -999.990 -999.990 1.484 ..P WKT 2010 08 18 17 29 55 31.3200 -97.3300 251.000 457.0 137.411 2.830 -999.990 -999.990 1.374 ..P WKT 2010 08 18 17 39 55 31.3200 -97.3300 251.000 30.0 138.234 2.340 -999.990 -999.990 1.382 ..P WKT 2010 08 18 17 44 55 31.3200 -97.3300 251.000 122.0 147.608 4.300 -999.990 -999.990 1.476 ..P WKT 2010 08 18 17 49 55 31.3200 -97.3300 251.000 457.0 139.899 4.550 -999.990 -999.990 1.399 ..P WKT 2010 08 18 17 54 55 31.3200 -97.3300 251.000 30.0 142.385 2.650 -999.990 -999.990 1.424 ..P WKT 2010 08 18 17 59 55 31.3200 -97.3300 251.000 122.0 147.076 2.990 -999.990 -999.990 1.471 ..P WKT 2010 08 18 18 04 55 31.3200 -97.3300 251.000 457.0 138.815 3.130 -999.990 -999.990 1.388 ..P WKT 2010 08 18 18 14 55 31.3200 -97.3300 251.000 30.0 139.633 2.730 -999.990 -999.990 1.396 ..P WKT 2010 08 18 18 19 55 31.3200 -97.3300 251.000 122.0 153.405 3.340 -999.990 -999.990 1.534 ..P WKT 2010 08 18 18 24 55 31.3200 -97.3300 251.000 457.0 143.604 3.850 -999.990 -999.990 1.436 ..P WKT 2010 08 18 18 29 55 31.3200 -97.3300 251.000 30.0 143.729 3.200 -999.990 -999.990 1.437 ..P WKT 2010 08 18 18 34 55 31.3200 -97.3300 251.000 122.0 152.127 3.460 -999.990 -999.990 1.521 ..P WKT 2010 08 18 18 39 55 31.3200 -97.3300 251.000 457.0 141.358 3.330 -999.990 -999.990 1.414 ..P WKT 2010 08 18 18 49 55 31.3200 -97.3300 251.000 30.0 143.834 2.940 -999.990 -999.990 1.438 ..P WKT 2010 08 18 18 54 55 31.3200 -97.3300 251.000 122.0 155.841 3.330 -999.990 -999.990 1.558 ..P WKT 2010 08 18 18 59 55 31.3200 -97.3300 251.000 457.0 141.087 4.660 -999.990 -999.990 1.411 ..P WKT 2010 08 18 19 04 55 31.3200 -97.3300 251.000 30.0 116.534 4.120 -999.990 -999.990 1.165 ..P WKT 2010 08 18 19 09 55 31.3200 -97.3300 251.000 122.0 123.437 5.370 -999.990 -999.990 1.234 ..P WKT 2010 08 18 19 14 55 31.3200 -97.3300 251.000 457.0 131.169 5.140 -999.990 -999.990 1.312 ..P WKT 2010 08 18 19 24 55 31.3200 -97.3300 251.000 30.0 119.960 6.020 -999.990 -999.990 1.200 ..P WKT 2010 08 18 19 29 55 31.3200 -97.3300 251.000 122.0 125.860 4.490 -999.990 -999.990 1.259 ..P WKT 2010 08 18 19 34 55 31.3200 -97.3300 251.000 457.0 129.138 4.250 -999.990 -999.990 1.291 ..P WKT 2010 08 18 19 39 55 31.3200 -97.3300 251.000 30.0 119.715 3.610 -999.990 -999.990 1.197 ..P WKT 2010 08 18 19 44 55 31.3200 -97.3300 251.000 122.0 135.697 3.910 -999.990 -999.990 1.357 ..P WKT 2010 08 18 19 49 55 31.3200 -97.3300 251.000 457.0 140.911 2.730 -999.990 -999.990 1.409 ..P WKT 2010 08 18 19 59 55 31.3200 -97.3300 251.000 30.0 126.855 2.990 -999.990 -999.990 1.269 ..P WKT 2010 08 18 20 04 55 31.3200 -97.3300 251.000 122.0 136.312 3.390 -999.990 -999.990 1.363 ..P WKT 2010 08 18 20 09 55 31.3200 -97.3300 251.000 457.0 134.995 3.830 -999.990 -999.990 1.350 ..P WKT 2010 08 18 20 14 55 31.3200 -97.3300 251.000 30.0 122.073 4.300 -999.990 -999.990 1.221 ..P WKT 2010 08 18 20 19 55 31.3200 -97.3300 251.000 122.0 129.597 3.280 -999.990 -999.990 1.296 ..P WKT 2010 08 18 20 24 55 31.3200 -97.3300 251.000 457.0 126.898 2.490 -999.990 -999.990 1.269 ..P WKT 2010 08 18 20 34 55 31.3200 -97.3300 251.000 30.0 122.840 2.520 -999.990 -999.990 1.228 ..P WKT 2010 08 18 20 39 55 31.3200 -97.3300 251.000 122.0 134.751 3.040 -999.990 -999.990 1.348 ..P WKT 2010 08 18 20 44 55 31.3200 -97.3300 251.000 457.0 109.341 4.230 -999.990 -999.990 1.093 ..P WKT 2010 08 18 20 49 55 31.3200 -97.3300 251.000 30.0 114.064 3.170 -999.990 -999.990 1.141 ..P WKT 2010 08 18 20 54 55 31.3200 -97.3300 251.000 122.0 125.426 3.170 -999.990 -999.990 1.254 ..P WKT 2010 08 18 20 59 55 31.3200 -97.3300 251.000 457.0 117.153 3.490 -999.990 -999.990 1.172 ..P WKT 2010 08 18 21 09 55 31.3200 -97.3300 251.000 30.0 124.728 3.660 -999.990 -999.990 1.247 ..P WKT 2010 08 18 21 14 55 31.3200 -97.3300 251.000 122.0 123.428 3.440 -999.990 -999.990 1.234 ..P WKT 2010 08 18 21 19 55 31.3200 -97.3300 251.000 457.0 132.365 3.800 -999.990 -999.990 1.324 ..P WKT 2010 08 18 21 24 55 31.3200 -97.3300 251.000 30.0 119.583 5.260 -999.990 -999.990 1.196 ..P WKT 2010 08 18 21 29 55 31.3200 -97.3300 251.000 122.0 115.654 3.770 -999.990 -999.990 1.157 ..P WKT 2010 08 18 21 34 55 31.3200 -97.3300 251.000 457.0 129.159 3.950 -999.990 -999.990 1.292 ..P WKT 2010 08 18 21 44 55 31.3200 -97.3300 251.000 30.0 120.687 3.310 -999.990 -999.990 1.207 ..P WKT 2010 08 18 21 49 55 31.3200 -97.3300 251.000 122.0 129.708 4.340 -999.990 -999.990 1.297 ..P WKT 2010 08 18 21 54 55 31.3200 -97.3300 251.000 457.0 129.455 4.500 -999.990 -999.990 1.295 ..P WKT 2010 08 18 21 59 55 31.3200 -97.3300 251.000 30.0 123.251 4.380 -999.990 -999.990 1.233 ..P WKT 2010 08 18 22 04 55 31.3200 -97.3300 251.000 122.0 131.997 3.940 -999.990 -999.990 1.320 ..P WKT 2010 08 18 22 09 55 31.3200 -97.3300 251.000 457.0 131.052 4.000 -999.990 -999.990 1.311 ..P WKT 2010 08 18 22 19 55 31.3200 -97.3300 251.000 30.0 128.847 4.400 -999.990 -999.990 1.288 ..P WKT 2010 08 18 22 24 55 31.3200 -97.3300 251.000 122.0 135.342 3.970 -999.990 -999.990 1.353 ..P WKT 2010 08 18 22 29 55 31.3200 -97.3300 251.000 457.0 113.996 4.240 -999.990 -999.990 1.140 ..P WKT 2010 08 18 22 34 55 31.3200 -97.3300 251.000 30.0 130.465 3.270 -999.990 -999.990 1.305 ..P WKT 2010 08 18 22 39 55 31.3200 -97.3300 251.000 122.0 138.070 2.960 -999.990 -999.990 1.381 ..P WKT 2010 08 18 22 44 55 31.3200 -97.3300 251.000 457.0 126.417 2.870 -999.990 -999.990 1.264 ..P WKT 2010 08 18 22 54 55 31.3200 -97.3300 251.000 30.0 123.062 3.760 -999.990 -999.990 1.231 ..P WKT 2010 08 18 22 59 55 31.3200 -97.3300 251.000 122.0 132.332 3.180 -999.990 -999.990 1.323 ..P WKT 2010 08 18 23 04 55 31.3200 -97.3300 251.000 457.0 134.951 2.830 -999.990 -999.990 1.350 ..P WKT 2010 08 18 23 09 55 31.3200 -97.3300 251.000 30.0 129.115 2.570 -999.990 -999.990 1.291 ..P WKT 2010 08 18 23 14 55 31.3200 -97.3300 251.000 122.0 129.793 3.910 -999.990 -999.990 1.298 ..P WKT 2010 08 18 23 19 55 31.3200 -97.3300 251.000 457.0 126.728 3.480 -999.990 -999.990 1.267 ..P WKT 2010 08 18 23 29 55 31.3200 -97.3300 251.000 30.0 134.122 4.120 -999.990 -999.990 1.341 ..P WKT 2010 08 18 23 34 55 31.3200 -97.3300 251.000 122.0 151.796 2.470 -999.990 -999.990 1.518 ..P WKT 2010 08 18 23 39 55 31.3200 -97.3300 251.000 457.0 143.951 2.020 -999.990 -999.990 1.440 ..P WKT 2010 08 18 23 44 55 31.3200 -97.3300 251.000 30.0 131.666 2.400 -999.990 -999.990 1.317 ..P WKT 2010 08 18 23 49 55 31.3200 -97.3300 251.000 122.0 144.905 2.780 -999.990 -999.990 1.449 ..P WKT 2010 08 19 00 09 55 31.3200 -97.3300 251.000 457.0 139.037 1.650 -999.990 -999.990 1.390 ..P WKT 2010 08 19 00 10 25 31.3200 -97.3300 251.000 457.0 133.183 3.230 -999.990 -999.990 1.332 ..P WKT 2010 08 19 00 10 55 31.3200 -97.3300 251.000 457.0 136.485 3.170 -999.990 -999.990 1.365 ..P WKT 2010 08 19 00 11 25 31.3200 -97.3300 251.000 457.0 135.625 2.860 -999.990 -999.990 1.356 ..P WKT 2010 08 19 00 11 55 31.3200 -97.3300 251.000 457.0 128.662 2.040 -999.990 -999.990 1.287 ..P WKT 2010 08 19 00 12 25 31.3200 -97.3300 251.000 457.0 133.905 1.610 -999.990 -999.990 1.339 ..P WKT 2010 08 19 00 12 55 31.3200 -97.3300 251.000 457.0 136.652 1.900 -999.990 -999.990 1.367 ..P WKT 2010 08 19 00 13 25 31.3200 -97.3300 251.000 457.0 134.960 3.580 -999.990 -999.990 1.350 ..P WKT 2010 08 19 00 13 55 31.3200 -97.3300 251.000 457.0 133.545 4.370 -999.990 -999.990 1.335 ..P WKT 2010 08 19 00 14 25 31.3200 -97.3300 251.000 457.0 137.956 1.790 -999.990 -999.990 1.380 ..P WKT 2010 08 19 00 14 55 31.3200 -97.3300 251.000 457.0 135.432 1.640 -999.990 -999.990 1.354 ..P WKT 2010 08 19 00 19 55 31.3200 -97.3300 251.000 30.0 128.498 1.680 -999.990 -999.990 1.285 ..P WKT 2010 08 19 00 24 55 31.3200 -97.3300 251.000 122.0 140.981 2.230 -999.990 -999.990 1.410 ..P WKT 2010 08 19 00 29 55 31.3200 -97.3300 251.000 457.0 134.880 2.620 -999.990 -999.990 1.349 ..P WKT 2010 08 19 00 34 55 31.3200 -97.3300 251.000 30.0 129.614 2.440 -999.990 -999.990 1.296 ..P WKT 2010 08 19 00 39 55 31.3200 -97.3300 251.000 122.0 138.764 2.230 -999.990 -999.990 1.388 ..P WKT 2010 08 19 00 44 55 31.3200 -97.3300 251.000 457.0 132.666 2.180 -999.990 -999.990 1.327 ..P WKT 2010 08 19 00 54 55 31.3200 -97.3300 251.000 30.0 136.973 2.070 -999.990 -999.990 1.370 ..P WKT 2010 08 19 00 59 55 31.3200 -97.3300 251.000 122.0 137.398 2.690 -999.990 -999.990 1.374 ..P WKT 2010 08 19 01 04 55 31.3200 -97.3300 251.000 457.0 132.560 2.540 -999.990 -999.990 1.326 ..P WKT 2010 08 19 01 09 55 31.3200 -97.3300 251.000 30.0 132.431 3.170 -999.990 -999.990 1.324 ..P WKT 2010 08 19 01 14 55 31.3200 -97.3300 251.000 122.0 133.134 3.420 -999.990 -999.990 1.331 ..P WKT 2010 08 19 01 19 55 31.3200 -97.3300 251.000 457.0 132.867 3.090 -999.990 -999.990 1.329 ..P WKT 2010 08 19 01 29 55 31.3200 -97.3300 251.000 30.0 132.195 3.520 -999.990 -999.990 1.322 ..P WKT 2010 08 19 01 34 55 31.3200 -97.3300 251.000 122.0 136.358 2.680 -999.990 -999.990 1.364 ..P WKT 2010 08 19 01 39 55 31.3200 -97.3300 251.000 457.0 131.109 2.180 -999.990 -999.990 1.311 ..P WKT 2010 08 19 01 44 55 31.3200 -97.3300 251.000 30.0 133.471 2.830 -999.990 -999.990 1.335 ..P WKT 2010 08 19 01 49 55 31.3200 -97.3300 251.000 122.0 146.210 3.170 -999.990 -999.990 1.462 ..P WKT 2010 08 19 01 54 55 31.3200 -97.3300 251.000 457.0 137.642 3.260 -999.990 -999.990 1.376 ..P WKT 2010 08 19 02 04 55 31.3200 -97.3300 251.000 30.0 141.770 2.330 -999.990 -999.990 1.418 ..P WKT 2010 08 19 02 09 55 31.3200 -97.3300 251.000 122.0 142.984 3.010 -999.990 -999.990 1.430 ..P WKT 2010 08 19 02 14 55 31.3200 -97.3300 251.000 457.0 137.285 2.210 -999.990 -999.990 1.373 ..P WKT 2010 08 19 02 19 55 31.3200 -97.3300 251.000 30.0 133.937 2.210 -999.990 -999.990 1.339 ..P WKT 2010 08 19 02 24 55 31.3200 -97.3300 251.000 122.0 139.575 3.610 -999.990 -999.990 1.396 ..P WKT 2010 08 19 02 29 55 31.3200 -97.3300 251.000 457.0 126.554 2.640 -999.990 -999.990 1.266 ..P WKT 2010 08 19 02 39 55 31.3200 -97.3300 251.000 30.0 137.510 2.720 -999.990 -999.990 1.375 ..P WKT 2010 08 19 02 44 55 31.3200 -97.3300 251.000 122.0 138.822 2.680 -999.990 -999.990 1.388 ..P WKT 2010 08 19 02 49 55 31.3200 -97.3300 251.000 457.0 131.708 3.350 -999.990 -999.990 1.317 ..P WKT 2010 08 19 02 54 55 31.3200 -97.3300 251.000 30.0 128.048 3.580 -999.990 -999.990 1.280 ..P WKT 2010 08 19 02 59 55 31.3200 -97.3300 251.000 122.0 137.923 4.140 -999.990 -999.990 1.379 ..P WKT 2010 08 19 03 04 55 31.3200 -97.3300 251.000 457.0 129.156 4.410 -999.990 -999.990 1.292 ..P WKT 2010 08 19 03 14 55 31.3200 -97.3300 251.000 30.0 147.436 3.350 -999.990 -999.990 1.474 ..P WKT 2010 08 19 03 19 55 31.3200 -97.3300 251.000 122.0 137.488 4.160 -999.990 -999.990 1.375 ..P WKT 2010 08 19 03 24 55 31.3200 -97.3300 251.000 457.0 132.234 2.410 -999.990 -999.990 1.322 ..P WKT 2010 08 19 03 29 55 31.3200 -97.3300 251.000 30.0 136.363 3.020 -999.990 -999.990 1.364 ..P WKT 2010 08 19 03 34 55 31.3200 -97.3300 251.000 122.0 133.594 3.500 -999.990 -999.990 1.336 ..P WKT 2010 08 19 03 39 55 31.3200 -97.3300 251.000 457.0 126.412 2.140 -999.990 -999.990 1.264 ..P WKT 2010 08 19 03 49 55 31.3200 -97.3300 251.000 30.0 138.904 3.260 -999.990 -999.990 1.389 ..P WKT 2010 08 19 03 54 55 31.3200 -97.3300 251.000 122.0 134.304 3.060 -999.990 -999.990 1.343 ..P WKT 2010 08 19 03 59 55 31.3200 -97.3300 251.000 457.0 122.812 2.940 -999.990 -999.990 1.228 ..P WKT 2010 08 19 04 04 55 31.3200 -97.3300 251.000 30.0 138.617 2.490 -999.990 -999.990 1.386 ..P WKT 2010 08 19 04 09 55 31.3200 -97.3300 251.000 122.0 136.224 4.160 -999.990 -999.990 1.362 ..P WKT 2010 08 19 04 14 55 31.3200 -97.3300 251.000 457.0 120.602 3.540 -999.990 -999.990 1.206 ..P WKT 2010 08 19 04 24 55 31.3200 -97.3300 251.000 30.0 148.023 4.120 -999.990 -999.990 1.480 ..P WKT 2010 08 19 04 29 55 31.3200 -97.3300 251.000 122.0 142.561 2.880 -999.990 -999.990 1.426 ..P WKT 2010 08 19 04 34 55 31.3200 -97.3300 251.000 457.0 128.008 4.850 -999.990 -999.990 1.280 ..P WKT 2010 08 19 04 39 55 31.3200 -97.3300 251.000 30.0 141.280 3.250 -999.990 -999.990 1.413 ..P WKT 2010 08 19 04 44 55 31.3200 -97.3300 251.000 122.0 144.633 3.420 -999.990 -999.990 1.446 ..P WKT 2010 08 19 04 49 55 31.3200 -97.3300 251.000 457.0 125.681 2.350 -999.990 -999.990 1.257 ..P WKT 2010 08 19 05 04 55 31.3200 -97.3300 251.000 30.0 133.726 3.090 -999.990 -999.990 1.337 ..P WKT 2010 08 19 05 09 55 31.3200 -97.3300 251.000 122.0 145.014 3.740 -999.990 -999.990 1.450 ..P WKT 2010 08 19 05 14 55 31.3200 -97.3300 251.000 457.0 130.847 3.540 -999.990 -999.990 1.308 ..P WKT 2010 08 19 05 19 55 31.3200 -97.3300 251.000 30.0 139.106 3.150 -999.990 -999.990 1.391 ..P WKT 2010 08 19 05 24 55 31.3200 -97.3300 251.000 122.0 142.412 2.810 -999.990 -999.990 1.424 ..P WKT 2010 08 19 05 29 55 31.3200 -97.3300 251.000 457.0 136.914 2.400 -999.990 -999.990 1.369 ..P WKT 2010 08 19 05 39 55 31.3200 -97.3300 251.000 30.0 144.864 3.110 -999.990 -999.990 1.449 ..P WKT 2010 08 19 05 44 55 31.3200 -97.3300 251.000 122.0 142.221 3.450 -999.990 -999.990 1.422 ..P WKT 2010 08 19 05 49 55 31.3200 -97.3300 251.000 457.0 135.730 3.760 -999.990 -999.990 1.357 ..P WKT 2010 08 19 05 54 55 31.3200 -97.3300 251.000 30.0 144.634 2.980 -999.990 -999.990 1.446 ..P WKT 2010 08 19 05 59 55 31.3200 -97.3300 251.000 122.0 138.145 3.960 -999.990 -999.990 1.381 ..P WKT 2010 08 19 06 04 55 31.3200 -97.3300 251.000 457.0 137.427 2.990 -999.990 -999.990 1.374 ..P WKT 2010 08 19 06 14 55 31.3200 -97.3300 251.000 30.0 138.977 3.170 -999.990 -999.990 1.390 ..P WKT 2010 08 19 06 19 55 31.3200 -97.3300 251.000 122.0 142.342 3.600 -999.990 -999.990 1.423 ..P WKT 2010 08 19 06 24 55 31.3200 -97.3300 251.000 457.0 168.639 3.380 -999.990 -999.990 1.686 ..P WKT 2010 08 19 06 29 55 31.3200 -97.3300 251.000 30.0 139.045 3.150 -999.990 -999.990 1.390 ..P WKT 2010 08 19 06 34 55 31.3200 -97.3300 251.000 122.0 146.801 3.390 -999.990 -999.990 1.468 ..P WKT 2010 08 19 06 39 55 31.3200 -97.3300 251.000 457.0 136.847 3.790 -999.990 -999.990 1.368 ..P WKT 2010 08 19 06 49 55 31.3200 -97.3300 251.000 30.0 140.179 3.900 -999.990 -999.990 1.402 ..P WKT 2010 08 19 06 54 55 31.3200 -97.3300 251.000 122.0 139.738 3.190 -999.990 -999.990 1.397 ..P WKT 2010 08 19 06 59 55 31.3200 -97.3300 251.000 457.0 134.220 3.630 -999.990 -999.990 1.342 ..P WKT 2010 08 19 07 04 55 31.3200 -97.3300 251.000 30.0 146.674 3.400 -999.990 -999.990 1.467 ..P WKT 2010 08 19 07 09 55 31.3200 -97.3300 251.000 122.0 139.511 3.150 -999.990 -999.990 1.395 ..P WKT 2010 08 19 07 14 55 31.3200 -97.3300 251.000 457.0 131.938 2.960 -999.990 -999.990 1.319 ..P WKT 2010 08 19 07 24 55 31.3200 -97.3300 251.000 30.0 147.099 3.250 -999.990 -999.990 1.471 ..P WKT 2010 08 19 07 29 55 31.3200 -97.3300 251.000 122.0 149.535 4.370 -999.990 -999.990 1.495 ..P WKT 2010 08 19 07 34 55 31.3200 -97.3300 251.000 457.0 132.782 2.980 -999.990 -999.990 1.328 ..P WKT 2010 08 19 07 39 55 31.3200 -97.3300 251.000 30.0 148.376 3.300 -999.990 -999.990 1.484 ..P WKT 2010 08 19 07 44 55 31.3200 -97.3300 251.000 122.0 150.263 3.050 -999.990 -999.990 1.503 ..P WKT 2010 08 19 07 49 55 31.3200 -97.3300 251.000 457.0 124.473 3.270 -999.990 -999.990 1.245 ..P WKT 2010 08 19 07 59 55 31.3200 -97.3300 251.000 30.0 139.524 2.800 -999.990 -999.990 1.395 ..P WKT 2010 08 19 08 04 55 31.3200 -97.3300 251.000 122.0 145.285 3.190 -999.990 -999.990 1.453 ..P WKT 2010 08 19 08 09 55 31.3200 -97.3300 251.000 457.0 110.511 3.510 -999.990 -999.990 1.105 ..P WKT 2010 08 19 08 14 55 31.3200 -97.3300 251.000 30.0 138.730 4.130 -999.990 -999.990 1.387 ..P WKT 2010 08 19 08 19 55 31.3200 -97.3300 251.000 122.0 138.465 3.600 -999.990 -999.990 1.385 ..P WKT 2010 08 19 08 24 55 31.3200 -97.3300 251.000 457.0 104.801 3.010 -999.990 -999.990 1.048 ..P WKT 2010 08 19 08 34 55 31.3200 -97.3300 251.000 30.0 142.247 3.260 -999.990 -999.990 1.422 ..P WKT 2010 08 19 08 39 55 31.3200 -97.3300 251.000 122.0 136.431 4.710 -999.990 -999.990 1.364 ..P WKT 2010 08 19 08 44 55 31.3200 -97.3300 251.000 457.0 111.189 3.930 -999.990 -999.990 1.112 ..P WKT 2010 08 19 08 49 55 31.3200 -97.3300 251.000 30.0 149.973 5.570 -999.990 -999.990 1.500 ..P WKT 2010 08 19 08 54 55 31.3200 -97.3300 251.000 122.0 138.687 4.490 -999.990 -999.990 1.387 ..P WKT 2010 08 19 08 59 55 31.3200 -97.3300 251.000 457.0 106.617 4.680 -999.990 -999.990 1.066 ..P WKT 2010 08 19 09 09 55 31.3200 -97.3300 251.000 30.0 145.805 4.360 -999.990 -999.990 1.458 ..P WKT 2010 08 19 09 14 55 31.3200 -97.3300 251.000 122.0 132.144 4.500 -999.990 -999.990 1.321 ..P WKT 2010 08 19 09 19 55 31.3200 -97.3300 251.000 457.0 109.738 4.010 -999.990 -999.990 1.097 ..P WKT 2010 08 19 09 24 55 31.3200 -97.3300 251.000 30.0 146.513 3.760 -999.990 -999.990 1.465 ..P WKT 2010 08 19 09 29 55 31.3200 -97.3300 251.000 122.0 130.807 3.770 -999.990 -999.990 1.308 ..P WKT 2010 08 19 09 34 55 31.3200 -97.3300 251.000 457.0 110.323 4.290 -999.990 -999.990 1.103 ..P WKT 2010 08 19 09 44 55 31.3200 -97.3300 251.000 30.0 146.214 4.130 -999.990 -999.990 1.462 ..P WKT 2010 08 19 09 49 55 31.3200 -97.3300 251.000 122.0 136.877 3.880 -999.990 -999.990 1.369 ..P WKT 2010 08 19 09 54 55 31.3200 -97.3300 251.000 457.0 109.108 2.970 -999.990 -999.990 1.091 ..P WKT 2010 08 19 09 59 55 31.3200 -97.3300 251.000 30.0 134.049 4.840 -999.990 -999.990 1.340 ..P WKT 2010 08 19 10 04 55 31.3200 -97.3300 251.000 122.0 134.546 3.170 -999.990 -999.990 1.345 ..P WKT 2010 08 19 10 09 55 31.3200 -97.3300 251.000 457.0 108.426 6.220 -999.990 -999.990 1.084 ..P WKT 2010 08 19 10 19 55 31.3200 -97.3300 251.000 30.0 137.812 3.450 -999.990 -999.990 1.378 ..P WKT 2010 08 19 10 24 55 31.3200 -97.3300 251.000 122.0 136.262 3.670 -999.990 -999.990 1.363 ..P WKT 2010 08 19 10 29 55 31.3200 -97.3300 251.000 457.0 101.970 3.120 -999.990 -999.990 1.020 ..P WKT 2010 08 19 10 34 55 31.3200 -97.3300 251.000 30.0 144.757 3.730 -999.990 -999.990 1.448 ..P WKT 2010 08 19 10 39 55 31.3200 -97.3300 251.000 122.0 143.480 3.010 -999.990 -999.990 1.435 ..P WKT 2010 08 19 10 44 55 31.3200 -97.3300 251.000 457.0 121.339 3.840 -999.990 -999.990 1.213 ..P WKT 2010 08 19 10 54 55 31.3200 -97.3300 251.000 30.0 143.856 3.140 -999.990 -999.990 1.439 ..P WKT 2010 08 19 10 59 55 31.3200 -97.3300 251.000 122.0 148.967 3.220 -999.990 -999.990 1.490 ..P WKT 2010 08 19 11 04 55 31.3200 -97.3300 251.000 457.0 108.690 3.380 -999.990 -999.990 1.087 ..P WKT 2010 08 19 11 09 55 31.3200 -97.3300 251.000 30.0 138.470 3.460 -999.990 -999.990 1.385 ..P WKT 2010 08 19 11 14 55 31.3200 -97.3300 251.000 122.0 151.755 3.490 -999.990 -999.990 1.518 ..P WKT 2010 08 19 11 19 55 31.3200 -97.3300 251.000 457.0 111.902 5.280 -999.990 -999.990 1.119 ..P WKT 2010 08 19 11 29 55 31.3200 -97.3300 251.000 30.0 142.968 3.250 -999.990 -999.990 1.430 ..P WKT 2010 08 19 11 34 55 31.3200 -97.3300 251.000 122.0 152.301 5.300 -999.990 -999.990 1.523 ..P WKT 2010 08 19 11 39 55 31.3200 -97.3300 251.000 457.0 125.138 3.120 -999.990 -999.990 1.251 ..P WKT 2010 08 19 11 44 55 31.3200 -97.3300 251.000 30.0 141.277 3.900 -999.990 -999.990 1.413 ..P WKT 2010 08 19 11 49 55 31.3200 -97.3300 251.000 122.0 143.528 3.560 -999.990 -999.990 1.435 ..P WKT 2010 08 19 12 09 55 31.3200 -97.3300 251.000 457.0 110.116 3.100 -999.990 -999.990 1.101 ..P WKT 2010 08 19 12 10 25 31.3200 -97.3300 251.000 457.0 114.723 4.620 -999.990 -999.990 1.147 ..P WKT 2010 08 19 12 10 55 31.3200 -97.3300 251.000 457.0 113.886 3.890 -999.990 -999.990 1.139 ..P WKT 2010 08 19 12 11 25 31.3200 -97.3300 251.000 457.0 108.694 2.860 -999.990 -999.990 1.087 ..P WKT 2010 08 19 12 11 55 31.3200 -97.3300 251.000 457.0 108.945 2.820 -999.990 -999.990 1.089 ..P WKT 2010 08 19 12 12 25 31.3200 -97.3300 251.000 457.0 108.653 3.310 -999.990 -999.990 1.087 ..P WKT 2010 08 19 12 12 55 31.3200 -97.3300 251.000 457.0 106.727 3.770 -999.990 -999.990 1.067 ..P WKT 2010 08 19 12 13 25 31.3200 -97.3300 251.000 457.0 103.167 3.110 -999.990 -999.990 1.032 ..P WKT 2010 08 19 12 13 55 31.3200 -97.3300 251.000 457.0 105.053 3.120 -999.990 -999.990 1.051 ..P WKT 2010 08 19 12 14 25 31.3200 -97.3300 251.000 457.0 105.305 3.310 -999.990 -999.990 1.053 ..P WKT 2010 08 19 12 14 55 31.3200 -97.3300 251.000 457.0 107.190 3.000 -999.990 -999.990 1.072 ..P WKT 2010 08 19 12 19 55 31.3200 -97.3300 251.000 30.0 144.834 3.330 -999.990 -999.990 1.448 ..P WKT 2010 08 19 12 24 55 31.3200 -97.3300 251.000 122.0 128.295 3.360 -999.990 -999.990 1.283 ..P WKT 2010 08 19 12 29 55 31.3200 -97.3300 251.000 457.0 104.401 4.290 -999.990 -999.990 1.044 ..P WKT 2010 08 19 12 34 55 31.3200 -97.3300 251.000 30.0 144.506 4.010 -999.990 -999.990 1.445 ..P WKT 2010 08 19 12 39 55 31.3200 -97.3300 251.000 122.0 137.496 3.390 -999.990 -999.990 1.375 ..P WKT 2010 08 19 12 44 55 31.3200 -97.3300 251.000 457.0 99.159 3.620 -999.990 -999.990 0.992 ..P WKT 2010 08 19 12 54 55 31.3200 -97.3300 251.000 30.0 139.343 3.940 -999.990 -999.990 1.393 ..P WKT 2010 08 19 12 59 55 31.3200 -97.3300 251.000 122.0 133.964 3.500 -999.990 -999.990 1.340 ..P WKT 2010 08 19 13 04 55 31.3200 -97.3300 251.000 457.0 100.378 3.590 -999.990 -999.990 1.004 ..P WKT 2010 08 19 13 09 55 31.3200 -97.3300 251.000 30.0 139.961 4.070 -999.990 -999.990 1.400 ..P WKT 2010 08 19 13 14 55 31.3200 -97.3300 251.000 122.0 131.173 3.840 -999.990 -999.990 1.312 ..P WKT 2010 08 19 13 19 55 31.3200 -97.3300 251.000 457.0 95.398 3.040 -999.990 -999.990 0.954 ..P WKT 2010 08 19 13 29 55 31.3200 -97.3300 251.000 30.0 137.377 3.320 -999.990 -999.990 1.374 ..P WKT 2010 08 19 13 34 55 31.3200 -97.3300 251.000 122.0 128.176 3.660 -999.990 -999.990 1.282 ..P WKT 2010 08 19 13 39 55 31.3200 -97.3300 251.000 457.0 94.843 4.240 -999.990 -999.990 0.948 ..P WKT 2010 08 19 13 44 55 31.3200 -97.3300 251.000 30.0 130.222 4.010 -999.990 -999.990 1.302 ..P WKT 2010 08 19 13 49 55 31.3200 -97.3300 251.000 122.0 129.882 4.430 -999.990 -999.990 1.299 ..P WKT 2010 08 19 13 54 55 31.3200 -97.3300 251.000 457.0 95.858 5.410 -999.990 -999.990 0.959 ..P WKT 2010 08 19 14 04 55 31.3200 -97.3300 251.000 30.0 135.642 4.940 -999.990 -999.990 1.356 ..P WKT 2010 08 19 14 09 55 31.3200 -97.3300 251.000 122.0 139.083 5.090 -999.990 -999.990 1.391 ..P WKT 2010 08 19 14 14 55 31.3200 -97.3300 251.000 457.0 95.458 4.650 -999.990 -999.990 0.955 ..P WKT 2010 08 19 14 19 55 31.3200 -97.3300 251.000 30.0 134.778 4.450 -999.990 -999.990 1.348 ..P WKT 2010 08 19 14 24 55 31.3200 -97.3300 251.000 122.0 140.403 4.850 -999.990 -999.990 1.404 ..P WKT 2010 08 19 14 29 55 31.3200 -97.3300 251.000 457.0 93.082 6.250 -999.990 -999.990 0.931 ..P WKT 2010 08 19 14 39 55 31.3200 -97.3300 251.000 30.0 135.075 4.360 -999.990 -999.990 1.351 ..P WKT 2010 08 19 14 44 55 31.3200 -97.3300 251.000 122.0 144.836 3.860 -999.990 -999.990 1.448 ..P WKT 2010 08 19 14 49 55 31.3200 -97.3300 251.000 457.0 96.581 4.260 -999.990 -999.990 0.966 ..P WKT 2010 08 19 14 54 55 31.3200 -97.3300 251.000 30.0 136.921 3.350 -999.990 -999.990 1.369 ..P WKT 2010 08 19 14 59 55 31.3200 -97.3300 251.000 122.0 146.138 3.880 -999.990 -999.990 1.461 ..P WKT 2010 08 19 15 04 55 31.3200 -97.3300 251.000 457.0 97.052 3.260 -999.990 -999.990 0.971 ..P WKT 2010 08 19 15 14 55 31.3200 -97.3300 251.000 30.0 137.063 3.190 -999.990 -999.990 1.371 ..P WKT 2010 08 19 15 19 55 31.3200 -97.3300 251.000 122.0 136.450 4.420 -999.990 -999.990 1.364 ..P WKT 2010 08 19 15 24 55 31.3200 -97.3300 251.000 457.0 114.254 3.860 -999.990 -999.990 1.143 ..P WKT 2010 08 19 15 29 55 31.3200 -97.3300 251.000 30.0 130.032 3.800 -999.990 -999.990 1.300 ..P WKT 2010 08 19 15 34 55 31.3200 -97.3300 251.000 122.0 129.144 4.070 -999.990 -999.990 1.291 ..P WKT 2010 08 19 15 39 55 31.3200 -97.3300 251.000 457.0 133.995 4.510 -999.990 -999.990 1.340 ..P WKT 2010 08 19 15 49 55 31.3200 -97.3300 251.000 30.0 115.549 5.520 -999.990 -999.990 1.155 ..P WKT 2010 08 19 15 54 55 31.3200 -97.3300 251.000 122.0 129.147 4.650 -999.990 -999.990 1.291 ..P WKT 2010 08 19 15 59 55 31.3200 -97.3300 251.000 457.0 114.317 4.080 -999.990 -999.990 1.143 ..P WKT 2010 08 19 16 04 55 31.3200 -97.3300 251.000 30.0 111.787 4.020 -999.990 -999.990 1.118 ..P WKT 2010 08 19 16 09 55 31.3200 -97.3300 251.000 122.0 126.209 4.190 -999.990 -999.990 1.262 ..P WKT 2010 08 19 16 14 55 31.3200 -97.3300 251.000 457.0 116.297 3.330 -999.990 -999.990 1.163 ..P WKT 2010 08 19 16 24 55 31.3200 -97.3300 251.000 30.0 116.706 3.190 -999.990 -999.990 1.167 ..P WKT 2010 08 19 16 29 55 31.3200 -97.3300 251.000 122.0 123.201 3.670 -999.990 -999.990 1.232 ..P WKT 2010 08 19 16 34 55 31.3200 -97.3300 251.000 457.0 114.380 4.540 -999.990 -999.990 1.144 ..P WKT 2010 08 19 16 39 55 31.3200 -97.3300 251.000 30.0 115.405 3.490 -999.990 -999.990 1.154 ..P WKT 2010 08 19 16 44 55 31.3200 -97.3300 251.000 122.0 124.364 3.850 -999.990 -999.990 1.244 ..P WKT 2010 08 19 16 49 55 31.3200 -97.3300 251.000 457.0 115.814 3.500 -999.990 -999.990 1.158 ..P WKT 2010 08 20 01 44 55 31.3200 -97.3300 251.000 30.0 115.235 4.050 -999.990 -999.990 1.152 ..P WKT 2010 08 20 01 49 55 31.3200 -97.3300 251.000 122.0 116.061 3.800 -999.990 -999.990 1.161 ..P WKT 2010 08 20 01 54 55 31.3200 -97.3300 251.000 457.0 109.565 4.860 -999.990 -999.990 1.096 ..P WKT 2010 08 20 02 04 55 31.3200 -97.3300 251.000 30.0 103.352 4.130 -999.990 -999.990 1.034 ..P WKT 2010 08 20 02 09 55 31.3200 -97.3300 251.000 122.0 109.994 4.160 -999.990 -999.990 1.100 ..P WKT 2010 08 20 02 14 55 31.3200 -97.3300 251.000 457.0 112.767 4.490 -999.990 -999.990 1.128 ..P WKT 2010 08 20 02 19 55 31.3200 -97.3300 251.000 30.0 104.620 4.210 -999.990 -999.990 1.046 ..P WKT 2010 08 20 02 24 55 31.3200 -97.3300 251.000 122.0 113.753 5.720 -999.990 -999.990 1.138 ..P WKT 2010 08 20 02 29 55 31.3200 -97.3300 251.000 457.0 113.624 4.510 -999.990 -999.990 1.136 ..P WKT 2010 08 20 02 39 55 31.3200 -97.3300 251.000 30.0 111.765 4.190 -999.990 -999.990 1.118 ..P WKT 2010 08 20 02 44 55 31.3200 -97.3300 251.000 122.0 114.322 3.880 -999.990 -999.990 1.143 ..P WKT 2010 08 20 02 49 55 31.3200 -97.3300 251.000 457.0 104.155 3.520 -999.990 -999.990 1.042 ..P WKT 2010 08 20 02 54 55 31.3200 -97.3300 251.000 30.0 98.274 4.040 -999.990 -999.990 0.983 ..P WKT 2010 08 20 02 59 55 31.3200 -97.3300 251.000 122.0 107.056 3.200 -999.990 -999.990 1.071 ..P WKT 2010 08 20 03 04 55 31.3200 -97.3300 251.000 457.0 103.666 3.770 -999.990 -999.990 1.037 ..P WKT 2010 08 20 03 14 55 31.3200 -97.3300 251.000 30.0 103.879 2.900 -999.990 -999.990 1.039 ..P WKT 2010 08 20 03 19 55 31.3200 -97.3300 251.000 122.0 111.361 3.170 -999.990 -999.990 1.114 ..P WKT 2010 08 20 03 24 55 31.3200 -97.3300 251.000 457.0 110.539 3.220 -999.990 -999.990 1.105 ..P WKT 2010 08 20 03 29 55 31.3200 -97.3300 251.000 30.0 104.458 3.100 -999.990 -999.990 1.045 ..P WKT 2010 08 20 03 34 55 31.3200 -97.3300 251.000 122.0 112.218 3.590 -999.990 -999.990 1.122 ..P WKT 2010 08 20 03 39 55 31.3200 -97.3300 251.000 457.0 109.181 3.210 -999.990 -999.990 1.092 ..P WKT 2010 08 20 03 49 55 31.3200 -97.3300 251.000 30.0 96.380 3.330 -999.990 -999.990 0.964 ..P WKT 2010 08 20 03 54 55 31.3200 -97.3300 251.000 122.0 101.847 3.410 -999.990 -999.990 1.018 ..P WKT 2010 08 20 03 59 55 31.3200 -97.3300 251.000 457.0 103.438 3.340 -999.990 -999.990 1.034 ..P WKT 2010 08 20 04 04 55 31.3200 -97.3300 251.000 30.0 95.057 4.200 -999.990 -999.990 0.951 ..P WKT 2010 08 20 04 09 55 31.3200 -97.3300 251.000 122.0 100.249 3.760 -999.990 -999.990 1.002 ..P WKT 2010 08 20 04 14 55 31.3200 -97.3300 251.000 457.0 102.671 3.490 -999.990 -999.990 1.027 ..P WKT 2010 08 20 04 24 55 31.3200 -97.3300 251.000 30.0 93.047 3.300 -999.990 -999.990 0.930 ..P WKT 2010 08 20 04 29 55 31.3200 -97.3300 251.000 122.0 100.953 3.560 -999.990 -999.990 1.010 ..P WKT 2010 08 20 04 34 55 31.3200 -97.3300 251.000 457.0 95.556 3.770 -999.990 -999.990 0.956 ..P WKT 2010 08 20 04 39 55 31.3200 -97.3300 251.000 30.0 99.860 3.340 -999.990 -999.990 0.999 ..P WKT 2010 08 20 04 44 55 31.3200 -97.3300 251.000 122.0 102.224 4.310 -999.990 -999.990 1.022 ..P WKT 2010 08 20 04 49 55 31.3200 -97.3300 251.000 457.0 94.885 3.730 -999.990 -999.990 0.949 ..P WKT 2010 08 20 05 04 55 31.3200 -97.3300 251.000 30.0 92.481 3.130 -999.990 -999.990 0.925 ..P WKT 2010 08 20 05 09 55 31.3200 -97.3300 251.000 122.0 99.040 3.420 -999.990 -999.990 0.990 ..P WKT 2010 08 20 05 14 55 31.3200 -97.3300 251.000 457.0 99.637 3.870 -999.990 -999.990 0.996 ..P WKT 2010 08 20 05 19 55 31.3200 -97.3300 251.000 30.0 93.715 4.310 -999.990 -999.990 0.937 ..P WKT 2010 08 20 05 24 55 31.3200 -97.3300 251.000 122.0 99.445 3.410 -999.990 -999.990 0.994 ..P WKT 2010 08 20 05 29 55 31.3200 -97.3300 251.000 457.0 94.909 3.540 -999.990 -999.990 0.949 ..P WKT 2010 08 20 05 39 55 31.3200 -97.3300 251.000 30.0 94.741 4.460 -999.990 -999.990 0.947 ..P WKT 2010 08 20 05 44 55 31.3200 -97.3300 251.000 122.0 96.472 3.240 -999.990 -999.990 0.965 ..P WKT 2010 08 20 05 49 55 31.3200 -97.3300 251.000 457.0 97.927 3.270 -999.990 -999.990 0.979 ..P WKT 2010 08 20 05 54 55 31.3200 -97.3300 251.000 30.0 94.385 3.980 -999.990 -999.990 0.944 ..P WKT 2010 08 20 05 59 55 31.3200 -97.3300 251.000 122.0 101.670 3.830 -999.990 -999.990 1.017 ..P WKT 2010 08 20 06 04 55 31.3200 -97.3300 251.000 457.0 93.408 3.160 -999.990 -999.990 0.934 ..P WKT 2010 08 20 06 14 55 31.3200 -97.3300 251.000 30.0 100.682 3.100 -999.990 -999.990 1.007 ..P WKT 2010 08 20 06 19 55 31.3200 -97.3300 251.000 122.0 99.976 3.580 -999.990 -999.990 1.000 ..P WKT 2010 08 20 06 24 55 31.3200 -97.3300 251.000 457.0 93.854 4.100 -999.990 -999.990 0.939 ..P WKT 2010 08 20 06 29 55 31.3200 -97.3300 251.000 30.0 98.008 3.710 -999.990 -999.990 0.980 ..P WKT 2010 08 20 06 34 55 31.3200 -97.3300 251.000 122.0 104.523 4.610 -999.990 -999.990 1.045 ..P WKT 2010 08 20 06 39 55 31.3200 -97.3300 251.000 457.0 95.344 4.520 -999.990 -999.990 0.953 ..P WKT 2010 08 20 06 49 55 31.3200 -97.3300 251.000 30.0 92.720 4.530 -999.990 -999.990 0.927 ..P WKT 2010 08 20 06 54 55 31.3200 -97.3300 251.000 122.0 101.639 3.550 -999.990 -999.990 1.016 ..P WKT 2010 08 20 06 59 55 31.3200 -97.3300 251.000 457.0 87.215 3.460 -999.990 -999.990 0.872 ..P WKT 2010 08 20 07 04 55 31.3200 -97.3300 251.000 30.0 92.522 3.560 -999.990 -999.990 0.925 ..P WKT 2010 08 20 07 09 55 31.3200 -97.3300 251.000 122.0 95.329 3.430 -999.990 -999.990 0.953 ..P WKT 2010 08 20 07 14 55 31.3200 -97.3300 251.000 457.0 90.352 3.460 -999.990 -999.990 0.904 ..P WKT 2010 08 20 07 24 55 31.3200 -97.3300 251.000 30.0 95.509 3.280 -999.990 -999.990 0.955 ..P WKT 2010 08 20 07 29 55 31.3200 -97.3300 251.000 122.0 99.807 3.720 -999.990 -999.990 0.998 ..P WKT 2010 08 20 07 34 55 31.3200 -97.3300 251.000 457.0 89.923 3.230 -999.990 -999.990 0.899 ..P WKT 2010 08 20 07 39 55 31.3200 -97.3300 251.000 30.0 96.446 3.130 -999.990 -999.990 0.964 ..P WKT 2010 08 20 07 44 55 31.3200 -97.3300 251.000 122.0 97.407 5.870 -999.990 -999.990 0.974 ..P WKT 2010 08 20 07 49 55 31.3200 -97.3300 251.000 457.0 97.812 3.860 -999.990 -999.990 0.978 ..P WKT 2010 08 20 07 59 55 31.3200 -97.3300 251.000 30.0 87.374 3.130 -999.990 -999.990 0.874 ..P WKT 2010 08 20 08 04 55 31.3200 -97.3300 251.000 122.0 97.397 3.620 -999.990 -999.990 0.974 ..P WKT 2010 08 20 08 09 55 31.3200 -97.3300 251.000 457.0 86.553 3.540 -999.990 -999.990 0.866 ..P WKT 2010 08 20 08 14 55 31.3200 -97.3300 251.000 30.0 94.629 4.020 -999.990 -999.990 0.946 ..P WKT 2010 08 20 08 19 55 31.3200 -97.3300 251.000 122.0 98.533 3.090 -999.990 -999.990 0.985 ..P WKT 2010 08 20 08 24 55 31.3200 -97.3300 251.000 457.0 92.974 2.910 -999.990 -999.990 0.930 ..P WKT 2010 08 20 08 34 55 31.3200 -97.3300 251.000 30.0 91.198 4.010 -999.990 -999.990 0.912 ..P WKT 2010 08 20 08 39 55 31.3200 -97.3300 251.000 122.0 103.059 3.520 -999.990 -999.990 1.031 ..P WKT 2010 08 20 08 44 55 31.3200 -97.3300 251.000 457.0 86.797 3.780 -999.990 -999.990 0.868 ..P WKT 2010 08 20 08 49 55 31.3200 -97.3300 251.000 30.0 93.368 3.910 -999.990 -999.990 0.934 ..P WKT 2010 08 20 08 54 55 31.3200 -97.3300 251.000 122.0 101.750 5.530 -999.990 -999.990 1.018 ..P WKT 2010 08 20 08 59 55 31.3200 -97.3300 251.000 457.0 86.320 4.510 -999.990 -999.990 0.863 ..P WKT 2010 08 20 09 09 55 31.3200 -97.3300 251.000 30.0 89.815 4.360 -999.990 -999.990 0.898 ..P WKT 2010 08 20 09 14 55 31.3200 -97.3300 251.000 122.0 101.086 4.260 -999.990 -999.990 1.011 ..P WKT 2010 08 20 09 19 55 31.3200 -97.3300 251.000 457.0 80.176 4.460 -999.990 -999.990 0.802 ..P WKT 2010 08 20 09 24 55 31.3200 -97.3300 251.000 30.0 91.448 3.900 -999.990 -999.990 0.914 ..P WKT 2010 08 20 09 29 55 31.3200 -97.3300 251.000 122.0 95.336 3.980 -999.990 -999.990 0.953 ..P WKT 2010 08 20 09 34 55 31.3200 -97.3300 251.000 457.0 78.184 4.020 -999.990 -999.990 0.782 ..P WKT 2010 08 20 09 44 55 31.3200 -97.3300 251.000 30.0 87.295 4.210 -999.990 -999.990 0.873 ..P WKT 2010 08 20 09 49 55 31.3200 -97.3300 251.000 122.0 91.264 4.500 -999.990 -999.990 0.913 ..P WKT 2010 08 20 09 54 55 31.3200 -97.3300 251.000 457.0 69.724 5.070 -999.990 -999.990 0.697 ..P WKT 2010 08 20 09 59 55 31.3200 -97.3300 251.000 30.0 77.178 4.140 -999.990 -999.990 0.772 ..P WKT 2010 08 20 10 04 55 31.3200 -97.3300 251.000 122.0 81.425 4.980 -999.990 -999.990 0.814 ..P WKT 2010 08 20 10 09 55 31.3200 -97.3300 251.000 457.0 74.520 4.100 -999.990 -999.990 0.745 ..P WKT 2010 08 20 10 19 55 31.3200 -97.3300 251.000 30.0 85.509 4.270 -999.990 -999.990 0.855 ..P WKT 2010 08 20 10 24 55 31.3200 -97.3300 251.000 122.0 90.715 4.160 -999.990 -999.990 0.907 ..P WKT 2010 08 20 10 29 55 31.3200 -97.3300 251.000 457.0 92.436 5.380 -999.990 -999.990 0.924 ..P WKT 2010 08 20 10 34 55 31.3200 -97.3300 251.000 30.0 93.041 5.590 -999.990 -999.990 0.930 ..P WKT 2010 08 20 10 39 55 31.3200 -97.3300 251.000 122.0 92.530 5.060 -999.990 -999.990 0.925 ..P WKT 2010 08 20 10 44 55 31.3200 -97.3300 251.000 457.0 95.368 5.560 -999.990 -999.990 0.954 ..P WKT 2010 08 20 10 54 55 31.3200 -97.3300 251.000 30.0 92.592 3.680 -999.990 -999.990 0.926 ..P WKT 2010 08 20 10 59 55 31.3200 -97.3300 251.000 122.0 90.884 4.520 -999.990 -999.990 0.909 ..P WKT 2010 08 20 11 04 55 31.3200 -97.3300 251.000 457.0 78.847 4.930 -999.990 -999.990 0.788 ..P WKT 2010 08 20 11 09 55 31.3200 -97.3300 251.000 30.0 86.630 4.620 -999.990 -999.990 0.866 ..P WKT 2010 08 20 11 14 55 31.3200 -97.3300 251.000 122.0 88.272 4.030 -999.990 -999.990 0.883 ..P WKT 2010 08 20 11 19 55 31.3200 -97.3300 251.000 457.0 84.051 5.180 -999.990 -999.990 0.841 ..P WKT 2010 08 20 11 29 55 31.3200 -97.3300 251.000 30.0 82.452 4.530 -999.990 -999.990 0.825 ..P WKT 2010 08 20 11 34 55 31.3200 -97.3300 251.000 122.0 87.592 4.200 -999.990 -999.990 0.876 ..P WKT 2010 08 20 11 39 55 31.3200 -97.3300 251.000 457.0 84.910 4.740 -999.990 -999.990 0.849 ..P WKT 2010 08 20 11 44 55 31.3200 -97.3300 251.000 30.0 85.579 4.490 -999.990 -999.990 0.856 ..P WKT 2010 08 20 11 49 55 31.3200 -97.3300 251.000 122.0 84.852 4.380 -999.990 -999.990 0.849 ..P WKT 2010 08 20 12 09 55 31.3200 -97.3300 251.000 457.0 80.853 3.840 -999.990 -999.990 0.809 ..P WKT 2010 08 20 12 10 25 31.3200 -97.3300 251.000 457.0 83.915 4.050 -999.990 -999.990 0.839 ..P WKT 2010 08 20 12 10 55 31.3200 -97.3300 251.000 457.0 84.181 4.200 -999.990 -999.990 0.842 ..P WKT 2010 08 20 12 11 25 31.3200 -97.3300 251.000 457.0 86.124 4.330 -999.990 -999.990 0.861 ..P WKT 2010 08 20 12 11 55 31.3200 -97.3300 251.000 457.0 84.715 4.050 -999.990 -999.990 0.847 ..P WKT 2010 08 20 12 12 25 31.3200 -97.3300 251.000 457.0 81.069 4.040 -999.990 -999.990 0.811 ..P WKT 2010 08 20 12 12 55 31.3200 -97.3300 251.000 457.0 84.689 3.810 -999.990 -999.990 0.847 ..P WKT 2010 08 20 12 13 25 31.3200 -97.3300 251.000 457.0 82.720 4.150 -999.990 -999.990 0.827 ..P WKT 2010 08 20 12 13 55 31.3200 -97.3300 251.000 457.0 85.782 4.520 -999.990 -999.990 0.858 ..P WKT 2010 08 20 12 14 25 31.3200 -97.3300 251.000 457.0 89.122 3.970 -999.990 -999.990 0.891 ..P WKT 2010 08 20 12 14 55 31.3200 -97.3300 251.000 457.0 84.918 3.960 -999.990 -999.990 0.849 ..P WKT 2010 08 20 12 19 55 31.3200 -97.3300 251.000 30.0 81.437 3.950 -999.990 -999.990 0.814 ..P WKT 2010 08 20 12 24 55 31.3200 -97.3300 251.000 122.0 91.370 4.020 -999.990 -999.990 0.914 ..P WKT 2010 08 20 12 29 55 31.3200 -97.3300 251.000 457.0 80.066 5.040 -999.990 -999.990 0.801 ..P WKT 2010 08 20 12 34 55 31.3200 -97.3300 251.000 30.0 87.763 4.160 -999.990 -999.990 0.878 ..P WKT 2010 08 20 12 39 55 31.3200 -97.3300 251.000 122.0 88.753 3.880 -999.990 -999.990 0.888 ..P WKT 2010 08 20 12 44 55 31.3200 -97.3300 251.000 457.0 81.221 4.010 -999.990 -999.990 0.812 ..P WKT 2010 08 20 12 54 55 31.3200 -97.3300 251.000 30.0 84.903 3.610 -999.990 -999.990 0.849 ..P WKT 2010 08 20 12 59 55 31.3200 -97.3300 251.000 122.0 89.132 3.730 -999.990 -999.990 0.891 ..P WKT 2010 08 20 13 04 55 31.3200 -97.3300 251.000 457.0 75.756 3.790 -999.990 -999.990 0.758 ..P WKT 2010 08 20 13 09 55 31.3200 -97.3300 251.000 30.0 79.985 3.550 -999.990 -999.990 0.800 ..P WKT 2010 08 20 13 14 55 31.3200 -97.3300 251.000 122.0 87.706 3.880 -999.990 -999.990 0.877 ..P WKT 2010 08 20 13 19 55 31.3200 -97.3300 251.000 457.0 75.727 3.760 -999.990 -999.990 0.757 ..P WKT 2010 08 20 13 29 55 31.3200 -97.3300 251.000 30.0 87.118 6.630 -999.990 -999.990 0.871 ..P WKT 2010 08 20 13 34 55 31.3200 -97.3300 251.000 122.0 90.508 3.800 -999.990 -999.990 0.905 ..P WKT 2010 08 20 13 39 55 31.3200 -97.3300 251.000 457.0 79.928 4.410 -999.990 -999.990 0.799 ..P WKT 2010 08 20 13 44 55 31.3200 -97.3300 251.000 30.0 87.369 3.520 -999.990 -999.990 0.874 ..P WKT 2010 08 20 13 49 55 31.3200 -97.3300 251.000 122.0 92.574 4.080 -999.990 -999.990 0.926 ..P WKT 2010 08 20 13 54 55 31.3200 -97.3300 251.000 457.0 76.127 3.890 -999.990 -999.990 0.761 ..P WKT 2010 08 20 14 04 55 31.3200 -97.3300 251.000 30.0 79.993 4.010 -999.990 -999.990 0.800 ..P WKT 2010 08 20 14 09 55 31.3200 -97.3300 251.000 122.0 91.086 5.290 -999.990 -999.990 0.911 ..P WKT 2010 08 20 14 14 55 31.3200 -97.3300 251.000 457.0 86.254 3.880 -999.990 -999.990 0.863 ..P WKT 2010 08 20 14 19 55 31.3200 -97.3300 251.000 30.0 86.171 3.980 -999.990 -999.990 0.862 ..P WKT 2010 08 20 14 24 55 31.3200 -97.3300 251.000 122.0 97.963 3.870 -999.990 -999.990 0.980 ..P WKT 2010 08 20 14 29 55 31.3200 -97.3300 251.000 457.0 88.799 3.560 -999.990 -999.990 0.888 ..P WKT 2010 08 20 14 39 55 31.3200 -97.3300 251.000 30.0 85.999 3.400 -999.990 -999.990 0.860 ..P WKT 2010 08 20 14 44 55 31.3200 -97.3300 251.000 122.0 95.157 3.510 -999.990 -999.990 0.952 ..P WKT 2010 08 20 14 49 55 31.3200 -97.3300 251.000 457.0 90.624 4.880 -999.990 -999.990 0.906 ..P WKT 2010 08 20 14 54 55 31.3200 -97.3300 251.000 30.0 88.046 4.970 -999.990 -999.990 0.880 ..P WKT 2010 08 20 14 59 55 31.3200 -97.3300 251.000 122.0 98.878 4.050 -999.990 -999.990 0.989 ..P WKT 2010 08 20 15 04 55 31.3200 -97.3300 251.000 457.0 83.171 3.790 -999.990 -999.990 0.832 ..P WKT 2010 08 20 15 14 55 31.3200 -97.3300 251.000 30.0 94.639 3.970 -999.990 -999.990 0.946 ..P WKT 2010 08 20 15 19 55 31.3200 -97.3300 251.000 122.0 94.436 4.140 -999.990 -999.990 0.944 ..P WKT 2010 08 20 15 24 55 31.3200 -97.3300 251.000 457.0 90.323 4.340 -999.990 -999.990 0.903 ..P WKT 2010 08 20 15 29 55 31.3200 -97.3300 251.000 30.0 93.194 4.340 -999.990 -999.990 0.932 ..P WKT 2010 08 20 15 34 55 31.3200 -97.3300 251.000 122.0 97.460 4.410 -999.990 -999.990 0.975 ..P WKT 2010 08 20 15 39 55 31.3200 -97.3300 251.000 457.0 89.995 3.830 -999.990 -999.990 0.900 ..P WKT 2010 08 20 15 49 55 31.3200 -97.3300 251.000 30.0 88.512 3.560 -999.990 -999.990 0.885 ..P WKT 2010 08 20 15 54 55 31.3200 -97.3300 251.000 122.0 93.937 4.570 -999.990 -999.990 0.939 ..P WKT 2010 08 20 15 59 55 31.3200 -97.3300 251.000 457.0 88.187 4.430 -999.990 -999.990 0.882 ..P WKT 2010 08 20 16 04 55 31.3200 -97.3300 251.000 30.0 85.790 4.210 -999.990 -999.990 0.858 ..P WKT 2010 08 20 16 09 55 31.3200 -97.3300 251.000 122.0 97.081 5.440 -999.990 -999.990 0.971 ..P WKT 2010 08 20 16 14 55 31.3200 -97.3300 251.000 457.0 91.331 3.840 -999.990 -999.990 0.913 ..P WKT 2010 08 20 16 24 55 31.3200 -97.3300 251.000 30.0 90.946 3.940 -999.990 -999.990 0.909 ..P WKT 2010 08 20 16 29 55 31.3200 -97.3300 251.000 122.0 101.897 4.980 -999.990 -999.990 1.019 ..P WKT 2010 08 20 16 34 55 31.3200 -97.3300 251.000 457.0 94.412 4.160 -999.990 -999.990 0.944 ..P WKT 2010 08 20 16 39 55 31.3200 -97.3300 251.000 30.0 92.793 4.510 -999.990 -999.990 0.928 ..P WKT 2010 08 20 16 44 55 31.3200 -97.3300 251.000 122.0 98.855 4.400 -999.990 -999.990 0.989 ..P WKT 2010 08 20 16 49 55 31.3200 -97.3300 251.000 457.0 99.610 4.710 -999.990 -999.990 0.996 ..P WKT 2010 08 20 17 04 55 31.3200 -97.3300 251.000 30.0 89.222 4.240 -999.990 -999.990 0.892 ..P WKT 2010 08 20 17 09 55 31.3200 -97.3300 251.000 122.0 100.269 4.570 -999.990 -999.990 1.003 ..P WKT 2010 08 20 17 14 55 31.3200 -97.3300 251.000 457.0 93.860 3.960 -999.990 -999.990 0.939 ..P WKT 2010 08 20 17 19 55 31.3200 -97.3300 251.000 30.0 94.572 4.630 -999.990 -999.990 0.946 ..P WKT 2010 08 20 17 24 55 31.3200 -97.3300 251.000 122.0 106.318 3.990 -999.990 -999.990 1.063 ..P WKT 2010 08 20 17 29 55 31.3200 -97.3300 251.000 457.0 97.255 3.750 -999.990 -999.990 0.973 ..P WKT 2010 08 20 17 39 55 31.3200 -97.3300 251.000 30.0 95.929 3.620 -999.990 -999.990 0.959 ..P WKT 2010 08 20 17 44 55 31.3200 -97.3300 251.000 122.0 105.482 3.580 -999.990 -999.990 1.055 ..P WKT 2010 08 20 17 49 55 31.3200 -97.3300 251.000 457.0 93.669 3.600 -999.990 -999.990 0.937 ..P WKT 2010 08 20 17 54 55 31.3200 -97.3300 251.000 30.0 89.118 3.520 -999.990 -999.990 0.891 ..P WKT 2010 08 20 17 59 55 31.3200 -97.3300 251.000 122.0 94.760 3.390 -999.990 -999.990 0.948 ..P WKT 2010 08 20 18 04 55 31.3200 -97.3300 251.000 457.0 86.020 3.880 -999.990 -999.990 0.860 ..P WKT 2010 08 20 18 14 55 31.3200 -97.3300 251.000 30.0 82.124 4.220 -999.990 -999.990 0.821 ..P WKT 2010 08 20 18 19 55 31.3200 -97.3300 251.000 122.0 95.486 3.720 -999.990 -999.990 0.955 ..P WKT 2010 08 20 18 24 55 31.3200 -97.3300 251.000 457.0 82.596 4.560 -999.990 -999.990 0.826 ..P WKT 2010 08 20 18 29 55 31.3200 -97.3300 251.000 30.0 84.229 3.480 -999.990 -999.990 0.842 ..P WKT 2010 08 20 18 34 55 31.3200 -97.3300 251.000 122.0 92.983 5.850 -999.990 -999.990 0.930 ..P WKT 2010 08 20 18 39 55 31.3200 -97.3300 251.000 457.0 89.589 3.730 -999.990 -999.990 0.896 ..P WKT 2010 08 20 18 49 55 31.3200 -97.3300 251.000 30.0 79.550 3.650 -999.990 -999.990 0.795 ..P WKT 2010 08 20 18 54 55 31.3200 -97.3300 251.000 122.0 87.566 3.450 -999.990 -999.990 0.876 ..P WKT 2010 08 20 18 59 55 31.3200 -97.3300 251.000 457.0 94.744 4.010 -999.990 -999.990 0.947 ..P WKT 2010 08 20 19 04 55 31.3200 -97.3300 251.000 30.0 84.329 4.170 -999.990 -999.990 0.843 ..P WKT 2010 08 20 19 09 55 31.3200 -97.3300 251.000 122.0 88.994 4.600 -999.990 -999.990 0.890 ..P WKT 2010 08 20 19 14 55 31.3200 -97.3300 251.000 457.0 78.858 3.950 -999.990 -999.990 0.789 ..P WKT 2010 08 20 19 24 55 31.3200 -97.3300 251.000 30.0 78.931 4.870 -999.990 -999.990 0.789 ..P WKT 2010 08 20 19 29 55 31.3200 -97.3300 251.000 122.0 87.465 3.950 -999.990 -999.990 0.875 ..P WKT 2010 08 20 19 34 55 31.3200 -97.3300 251.000 457.0 82.875 3.480 -999.990 -999.990 0.829 ..P WKT 2010 08 20 19 39 55 31.3200 -97.3300 251.000 30.0 85.266 3.280 -999.990 -999.990 0.853 ..P WKT 2010 08 20 19 44 55 31.3200 -97.3300 251.000 122.0 91.845 4.120 -999.990 -999.990 0.918 ..P WKT 2010 08 20 19 49 55 31.3200 -97.3300 251.000 457.0 83.066 3.890 -999.990 -999.990 0.831 ..P WKT 2010 08 20 19 59 55 31.3200 -97.3300 251.000 30.0 76.717 3.680 -999.990 -999.990 0.767 ..P WKT 2010 08 20 20 04 55 31.3200 -97.3300 251.000 122.0 91.713 4.090 -999.990 -999.990 0.917 ..P WKT 2010 08 20 20 09 55 31.3200 -97.3300 251.000 457.0 84.650 5.340 -999.990 -999.990 0.847 ..P WKT 2010 08 20 20 14 55 31.3200 -97.3300 251.000 30.0 78.703 4.160 -999.990 -999.990 0.787 ..P WKT 2010 08 20 20 19 55 31.3200 -97.3300 251.000 122.0 94.257 5.050 -999.990 -999.990 0.943 ..P WKT 2010 08 20 20 24 55 31.3200 -97.3300 251.000 457.0 79.654 4.370 -999.990 -999.990 0.797 ..P WKT 2010 08 20 20 34 55 31.3200 -97.3300 251.000 30.0 83.059 5.280 -999.990 -999.990 0.831 ..P WKT 2010 08 20 20 39 55 31.3200 -97.3300 251.000 122.0 88.641 5.580 -999.990 -999.990 0.886 ..P WKT 2010 08 20 20 44 55 31.3200 -97.3300 251.000 457.0 81.378 5.890 -999.990 -999.990 0.814 ..P WKT 2010 08 20 20 49 55 31.3200 -97.3300 251.000 30.0 81.097 4.660 -999.990 -999.990 0.811 ..P WKT 2010 08 20 20 54 55 31.3200 -97.3300 251.000 122.0 87.096 6.010 -999.990 -999.990 0.871 ..P WKT 2010 08 20 20 59 55 31.3200 -97.3300 251.000 457.0 72.435 4.590 -999.990 -999.990 0.724 ..P WKT 2010 08 20 21 09 55 31.3200 -97.3300 251.000 30.0 76.857 4.130 -999.990 -999.990 0.769 ..P WKT 2010 08 20 21 14 55 31.3200 -97.3300 251.000 122.0 82.538 5.040 -999.990 -999.990 0.825 ..P WKT 2010 08 20 21 19 55 31.3200 -97.3300 251.000 457.0 78.726 5.200 -999.990 -999.990 0.787 ..P WKT 2010 08 20 21 24 55 31.3200 -97.3300 251.000 30.0 76.031 4.380 -999.990 -999.990 0.760 ..P WKT 2010 08 20 21 29 55 31.3200 -97.3300 251.000 122.0 85.062 5.520 -999.990 -999.990 0.851 ..P WKT 2010 08 20 21 34 55 31.3200 -97.3300 251.000 457.0 74.131 4.210 -999.990 -999.990 0.741 ..P WKT 2010 08 20 21 44 55 31.3200 -97.3300 251.000 30.0 86.429 4.980 -999.990 -999.990 0.864 ..P WKT 2010 08 20 21 49 55 31.3200 -97.3300 251.000 122.0 88.719 4.950 -999.990 -999.990 0.887 ..P WKT 2010 08 20 21 54 55 31.3200 -97.3300 251.000 457.0 78.726 4.050 -999.990 -999.990 0.787 ..P WKT 2010 08 20 21 59 55 31.3200 -97.3300 251.000 30.0 74.455 3.950 -999.990 -999.990 0.745 ..P WKT 2010 08 20 22 04 55 31.3200 -97.3300 251.000 122.0 84.144 3.920 -999.990 -999.990 0.841 ..P WKT 2010 08 20 22 09 55 31.3200 -97.3300 251.000 457.0 78.478 4.270 -999.990 -999.990 0.785 ..P WKT 2010 08 20 22 19 55 31.3200 -97.3300 251.000 30.0 85.890 5.180 -999.990 -999.990 0.859 ..P WKT 2010 08 20 22 24 55 31.3200 -97.3300 251.000 122.0 90.035 4.550 -999.990 -999.990 0.900 ..P WKT 2010 08 20 22 29 55 31.3200 -97.3300 251.000 457.0 90.132 4.260 -999.990 -999.990 0.901 ..P WKT 2010 08 20 22 34 55 31.3200 -97.3300 251.000 30.0 84.226 4.290 -999.990 -999.990 0.842 ..P WKT 2010 08 20 22 39 55 31.3200 -97.3300 251.000 122.0 93.535 4.320 -999.990 -999.990 0.935 ..P WKT 2010 08 20 22 44 55 31.3200 -97.3300 251.000 457.0 82.745 4.580 -999.990 -999.990 0.827 ..P WKT 2010 08 20 22 54 55 31.3200 -97.3300 251.000 30.0 83.716 4.400 -999.990 -999.990 0.837 ..P WKT 2010 08 20 22 59 55 31.3200 -97.3300 251.000 122.0 96.035 4.130 -999.990 -999.990 0.960 ..P WKT 2010 08 20 23 04 55 31.3200 -97.3300 251.000 457.0 85.744 3.790 -999.990 -999.990 0.857 ..P WKT 2010 08 20 23 09 55 31.3200 -97.3300 251.000 30.0 85.502 3.650 -999.990 -999.990 0.855 ..P WKT 2010 08 20 23 14 55 31.3200 -97.3300 251.000 122.0 88.330 4.230 -999.990 -999.990 0.883 ..P WKT 2010 08 20 23 19 55 31.3200 -97.3300 251.000 457.0 79.994 3.960 -999.990 -999.990 0.800 ..P WKT 2010 08 20 23 29 55 31.3200 -97.3300 251.000 30.0 80.935 3.430 -999.990 -999.990 0.809 ..P WKT 2010 08 20 23 34 55 31.3200 -97.3300 251.000 122.0 91.608 3.390 -999.990 -999.990 0.916 ..P WKT 2010 08 20 23 39 55 31.3200 -97.3300 251.000 457.0 88.326 4.030 -999.990 -999.990 0.883 ..P WKT 2010 08 20 23 44 55 31.3200 -97.3300 251.000 30.0 75.832 3.640 -999.990 -999.990 0.758 ..P WKT 2010 08 20 23 49 55 31.3200 -97.3300 251.000 122.0 95.158 3.410 -999.990 -999.990 0.952 ..P WKT 2010 08 21 00 09 55 31.3200 -97.3300 251.000 457.0 82.646 4.020 -999.990 -999.990 0.826 ..P WKT 2010 08 21 00 10 25 31.3200 -97.3300 251.000 457.0 82.604 3.780 -999.990 -999.990 0.826 ..P WKT 2010 08 21 00 10 55 31.3200 -97.3300 251.000 457.0 77.818 4.330 -999.990 -999.990 0.778 ..P WKT 2010 08 21 00 11 25 31.3200 -97.3300 251.000 457.0 78.055 3.720 -999.990 -999.990 0.781 ..P WKT 2010 08 21 00 11 55 31.3200 -97.3300 251.000 457.0 79.131 3.900 -999.990 -999.990 0.791 ..P WKT 2010 08 21 00 12 25 31.3200 -97.3300 251.000 457.0 76.578 3.650 -999.990 -999.990 0.766 ..P WKT 2010 08 21 00 12 55 31.3200 -97.3300 251.000 457.0 81.838 4.180 -999.990 -999.990 0.818 ..P WKT 2010 08 21 00 13 25 31.3200 -97.3300 251.000 457.0 83.749 3.800 -999.990 -999.990 0.837 ..P WKT 2010 08 21 00 13 55 31.3200 -97.3300 251.000 457.0 82.592 3.590 -999.990 -999.990 0.826 ..P WKT 2010 08 21 00 14 25 31.3200 -97.3300 251.000 457.0 82.271 3.550 -999.990 -999.990 0.823 ..P WKT 2010 08 21 00 14 55 31.3200 -97.3300 251.000 457.0 89.206 3.860 -999.990 -999.990 0.892 ..P WKT 2010 08 21 00 19 55 31.3200 -97.3300 251.000 30.0 75.955 5.080 -999.990 -999.990 0.760 ..P WKT 2010 08 21 00 24 55 31.3200 -97.3300 251.000 122.0 86.420 3.660 -999.990 -999.990 0.864 ..P WKT 2010 08 21 00 29 55 31.3200 -97.3300 251.000 457.0 82.656 4.000 -999.990 -999.990 0.827 ..P WKT 2010 08 21 00 34 55 31.3200 -97.3300 251.000 30.0 85.030 4.160 -999.990 -999.990 0.850 ..P WKT 2010 08 21 00 39 55 31.3200 -97.3300 251.000 122.0 85.311 4.260 -999.990 -999.990 0.853 ..P WKT 2010 08 21 00 44 55 31.3200 -97.3300 251.000 457.0 74.855 3.690 -999.990 -999.990 0.749 ..P WKT 2010 08 21 00 54 55 31.3200 -97.3300 251.000 30.0 78.471 3.940 -999.990 -999.990 0.785 ..P WKT 2010 08 21 00 59 55 31.3200 -97.3300 251.000 122.0 84.314 3.750 -999.990 -999.990 0.843 ..P WKT 2010 08 21 01 04 55 31.3200 -97.3300 251.000 457.0 79.422 4.230 -999.990 -999.990 0.794 ..P WKT 2010 08 21 01 09 55 31.3200 -97.3300 251.000 30.0 77.458 4.070 -999.990 -999.990 0.775 ..P WKT 2010 08 21 01 14 55 31.3200 -97.3300 251.000 122.0 96.818 4.580 -999.990 -999.990 0.968 ..P WKT 2010 08 21 01 19 55 31.3200 -97.3300 251.000 457.0 80.638 3.830 -999.990 -999.990 0.806 ..P WKT 2010 08 21 01 29 55 31.3200 -97.3300 251.000 30.0 86.525 3.640 -999.990 -999.990 0.865 ..P WKT 2010 08 21 01 34 55 31.3200 -97.3300 251.000 122.0 91.308 7.310 -999.990 -999.990 0.913 ..P WKT 2010 08 21 01 39 55 31.3200 -97.3300 251.000 457.0 88.847 4.200 -999.990 -999.990 0.888 ..P WKT 2010 08 21 01 44 55 31.3200 -97.3300 251.000 30.0 89.311 3.800 -999.990 -999.990 0.893 ..P WKT 2010 08 21 01 49 55 31.3200 -97.3300 251.000 122.0 93.814 5.170 -999.990 -999.990 0.938 ..P WKT 2010 08 21 01 54 55 31.3200 -97.3300 251.000 457.0 86.618 4.110 -999.990 -999.990 0.866 ..P WKT 2010 08 21 02 04 55 31.3200 -97.3300 251.000 30.0 85.040 4.690 -999.990 -999.990 0.850 ..P WKT 2010 08 21 02 09 55 31.3200 -97.3300 251.000 122.0 87.871 4.290 -999.990 -999.990 0.879 ..P WKT 2010 08 21 02 14 55 31.3200 -97.3300 251.000 457.0 86.665 4.340 -999.990 -999.990 0.867 ..P WKT 2010 08 21 02 19 55 31.3200 -97.3300 251.000 30.0 84.623 4.150 -999.990 -999.990 0.846 ..P WKT 2010 08 21 02 24 55 31.3200 -97.3300 251.000 122.0 89.403 4.450 -999.990 -999.990 0.894 ..P WKT 2010 08 21 02 29 55 31.3200 -97.3300 251.000 457.0 83.882 4.240 -999.990 -999.990 0.839 ..P WKT 2010 08 21 02 39 55 31.3200 -97.3300 251.000 30.0 83.339 4.420 -999.990 -999.990 0.833 ..P WKT 2010 08 21 02 44 55 31.3200 -97.3300 251.000 122.0 85.671 4.280 -999.990 -999.990 0.857 ..P WKT 2010 08 21 02 49 55 31.3200 -97.3300 251.000 457.0 74.926 4.490 -999.990 -999.990 0.749 ..P WKT 2010 08 21 02 54 55 31.3200 -97.3300 251.000 30.0 82.823 4.320 -999.990 -999.990 0.828 ..P WKT 2010 08 21 02 59 55 31.3200 -97.3300 251.000 122.0 89.050 4.440 -999.990 -999.990 0.890 ..P WKT 2010 08 21 03 04 55 31.3200 -97.3300 251.000 457.0 79.698 4.380 -999.990 -999.990 0.797 ..P WKT 2010 08 21 03 14 55 31.3200 -97.3300 251.000 30.0 80.229 5.110 -999.990 -999.990 0.802 ..P WKT 2010 08 21 03 19 55 31.3200 -97.3300 251.000 122.0 82.878 4.210 -999.990 -999.990 0.829 ..P WKT 2010 08 21 03 24 55 31.3200 -97.3300 251.000 457.0 80.522 5.310 -999.990 -999.990 0.805 ..P WKT 2010 08 21 03 29 55 31.3200 -97.3300 251.000 30.0 76.775 5.550 -999.990 -999.990 0.768 ..P WKT 2010 08 21 03 34 55 31.3200 -97.3300 251.000 122.0 87.208 4.050 -999.990 -999.990 0.872 ..P WKT 2010 08 21 03 39 55 31.3200 -97.3300 251.000 457.0 75.678 3.800 -999.990 -999.990 0.757 ..P WKT 2010 08 21 03 49 55 31.3200 -97.3300 251.000 30.0 81.213 4.050 -999.990 -999.990 0.812 ..P WKT 2010 08 21 03 54 55 31.3200 -97.3300 251.000 122.0 81.875 3.990 -999.990 -999.990 0.819 ..P WKT 2010 08 21 03 59 55 31.3200 -97.3300 251.000 457.0 68.643 3.920 -999.990 -999.990 0.686 ..P WKT 2010 08 21 04 04 55 31.3200 -97.3300 251.000 30.0 73.196 4.110 -999.990 -999.990 0.732 ..P WKT 2010 08 21 04 09 55 31.3200 -97.3300 251.000 122.0 77.472 4.190 -999.990 -999.990 0.775 ..P WKT 2010 08 21 04 14 55 31.3200 -97.3300 251.000 457.0 76.745 4.610 -999.990 -999.990 0.767 ..P WKT 2010 08 21 04 24 55 31.3200 -97.3300 251.000 30.0 69.161 4.610 -999.990 -999.990 0.692 ..P WKT 2010 08 21 04 29 55 31.3200 -97.3300 251.000 122.0 81.192 4.190 -999.990 -999.990 0.812 ..P WKT 2010 08 21 04 34 55 31.3200 -97.3300 251.000 457.0 74.335 4.830 -999.990 -999.990 0.743 ..P WKT 2010 08 21 04 39 55 31.3200 -97.3300 251.000 30.0 73.590 4.570 -999.990 -999.990 0.736 ..P WKT 2010 08 21 04 44 55 31.3200 -97.3300 251.000 122.0 77.564 4.040 -999.990 -999.990 0.776 ..P WKT 2010 08 21 04 49 55 31.3200 -97.3300 251.000 457.0 75.291 4.920 -999.990 -999.990 0.753 ..P WKT 2010 08 21 05 04 55 31.3200 -97.3300 251.000 30.0 71.607 5.340 -999.990 -999.990 0.716 ..P WKT 2010 08 21 05 09 55 31.3200 -97.3300 251.000 122.0 77.562 4.630 -999.990 -999.990 0.776 ..P WKT 2010 08 21 05 14 55 31.3200 -97.3300 251.000 457.0 69.085 4.250 -999.990 -999.990 0.691 ..P WKT 2010 08 21 05 19 55 31.3200 -97.3300 251.000 30.0 74.069 5.420 -999.990 -999.990 0.741 ..P WKT 2010 08 21 05 24 55 31.3200 -97.3300 251.000 122.0 80.438 4.440 -999.990 -999.990 0.804 ..P WKT 2010 08 21 05 29 55 31.3200 -97.3300 251.000 457.0 78.068 4.660 -999.990 -999.990 0.781 ..P WKT 2010 08 21 05 39 55 31.3200 -97.3300 251.000 30.0 68.651 4.630 -999.990 -999.990 0.687 ..P WKT 2010 08 21 05 44 55 31.3200 -97.3300 251.000 122.0 78.526 4.210 -999.990 -999.990 0.785 ..P WKT 2010 08 21 05 49 55 31.3200 -97.3300 251.000 457.0 74.116 4.110 -999.990 -999.990 0.741 ..P WKT 2010 08 21 05 54 55 31.3200 -97.3300 251.000 30.0 73.172 4.010 -999.990 -999.990 0.732 ..P WKT 2010 08 21 05 59 55 31.3200 -97.3300 251.000 122.0 73.201 5.210 -999.990 -999.990 0.732 ..P WKT 2010 08 21 06 04 55 31.3200 -97.3300 251.000 457.0 65.326 5.080 -999.990 -999.990 0.653 ..P WKT 2010 08 21 06 14 55 31.3200 -97.3300 251.000 30.0 77.797 4.950 -999.990 -999.990 0.778 ..P WKT 2010 08 21 06 19 55 31.3200 -97.3300 251.000 122.0 78.043 3.990 -999.990 -999.990 0.780 ..P WKT 2010 08 21 06 24 55 31.3200 -97.3300 251.000 457.0 68.449 4.540 -999.990 -999.990 0.684 ..P WKT 2010 08 21 06 29 55 31.3200 -97.3300 251.000 30.0 74.514 4.100 -999.990 -999.990 0.745 ..P WKT 2010 08 21 06 34 55 31.3200 -97.3300 251.000 122.0 78.778 4.400 -999.990 -999.990 0.788 ..P WKT 2010 08 21 06 39 55 31.3200 -97.3300 251.000 457.0 68.356 4.690 -999.990 -999.990 0.684 ..P WKT 2010 08 21 06 49 55 31.3200 -97.3300 251.000 30.0 71.458 5.140 -999.990 -999.990 0.715 ..P WKT 2010 08 21 06 54 55 31.3200 -97.3300 251.000 122.0 73.901 5.540 -999.990 -999.990 0.739 ..P WKT 2010 08 21 06 59 55 31.3200 -97.3300 251.000 457.0 69.695 5.940 -999.990 -999.990 0.697 ..P WKT 2010 08 21 07 04 55 31.3200 -97.3300 251.000 30.0 73.521 4.450 -999.990 -999.990 0.735 ..P WKT 2010 08 21 07 09 55 31.3200 -97.3300 251.000 122.0 69.315 4.480 -999.990 -999.990 0.693 ..P WKT 2010 08 21 07 14 55 31.3200 -97.3300 251.000 457.0 59.019 5.410 -999.990 -999.990 0.590 ..P WKT 2010 08 21 07 24 55 31.3200 -97.3300 251.000 30.0 67.976 4.050 -999.990 -999.990 0.680 ..P WKT 2010 08 21 07 29 55 31.3200 -97.3300 251.000 122.0 76.981 5.010 -999.990 -999.990 0.770 ..P WKT 2010 08 21 07 34 55 31.3200 -97.3300 251.000 457.0 62.457 4.240 -999.990 -999.990 0.625 ..P WKT 2010 08 21 07 39 55 31.3200 -97.3300 251.000 30.0 73.398 4.910 -999.990 -999.990 0.734 ..P WKT 2010 08 21 07 44 55 31.3200 -97.3300 251.000 122.0 79.079 4.390 -999.990 -999.990 0.791 ..P WKT 2010 08 21 07 49 55 31.3200 -97.3300 251.000 457.0 68.433 4.570 -999.990 -999.990 0.684 ..P WKT 2010 08 21 07 59 55 31.3200 -97.3300 251.000 30.0 74.536 4.050 -999.990 -999.990 0.745 ..P WKT 2010 08 21 08 04 55 31.3200 -97.3300 251.000 122.0 76.618 5.130 -999.990 -999.990 0.766 ..P WKT 2010 08 21 08 09 55 31.3200 -97.3300 251.000 457.0 61.827 4.730 -999.990 -999.990 0.618 ..P WKT 2010 08 21 08 14 55 31.3200 -97.3300 251.000 30.0 73.868 4.550 -999.990 -999.990 0.739 ..P WKT 2010 08 21 08 19 55 31.3200 -97.3300 251.000 122.0 75.120 4.430 -999.990 -999.990 0.751 ..P WKT 2010 08 21 08 24 55 31.3200 -97.3300 251.000 457.0 67.108 3.980 -999.990 -999.990 0.671 ..P WKT 2010 08 21 08 34 55 31.3200 -97.3300 251.000 30.0 75.044 4.270 -999.990 -999.990 0.750 ..P WKT 2010 08 21 08 39 55 31.3200 -97.3300 251.000 122.0 82.556 4.800 -999.990 -999.990 0.826 ..P WKT 2010 08 21 08 44 55 31.3200 -97.3300 251.000 457.0 62.561 5.250 -999.990 -999.990 0.626 ..P WKT 2010 08 21 08 49 55 31.3200 -97.3300 251.000 30.0 69.520 5.950 -999.990 -999.990 0.695 ..P WKT 2010 08 21 08 54 55 31.3200 -97.3300 251.000 122.0 79.793 5.350 -999.990 -999.990 0.798 ..P WKT 2010 08 21 08 59 55 31.3200 -97.3300 251.000 457.0 67.128 5.870 -999.990 -999.990 0.671 ..P WKT 2010 08 21 09 09 55 31.3200 -97.3300 251.000 30.0 77.131 5.490 -999.990 -999.990 0.771 ..P WKT 2010 08 21 09 14 55 31.3200 -97.3300 251.000 122.0 75.757 4.960 -999.990 -999.990 0.758 ..P WKT 2010 08 21 09 19 55 31.3200 -97.3300 251.000 457.0 66.649 5.290 -999.990 -999.990 0.666 ..P WKT 2010 08 21 09 24 55 31.3200 -97.3300 251.000 30.0 71.353 4.860 -999.990 -999.990 0.714 ..P WKT 2010 08 21 09 29 55 31.3200 -97.3300 251.000 122.0 75.919 4.820 -999.990 -999.990 0.759 ..P WKT 2010 08 21 09 34 55 31.3200 -97.3300 251.000 457.0 63.084 4.520 -999.990 -999.990 0.631 ..P WKT 2010 08 21 09 44 55 31.3200 -97.3300 251.000 30.0 70.399 4.260 -999.990 -999.990 0.704 ..P WKT 2010 08 21 09 49 55 31.3200 -97.3300 251.000 122.0 72.872 4.720 -999.990 -999.990 0.729 ..P WKT 2010 08 21 09 54 55 31.3200 -97.3300 251.000 457.0 65.131 5.020 -999.990 -999.990 0.651 ..P WKT 2010 08 21 09 59 55 31.3200 -97.3300 251.000 30.0 70.226 4.230 -999.990 -999.990 0.702 ..P WKT 2010 08 21 10 04 55 31.3200 -97.3300 251.000 122.0 72.009 4.340 -999.990 -999.990 0.720 ..P WKT 2010 08 21 10 09 55 31.3200 -97.3300 251.000 457.0 59.163 4.350 -999.990 -999.990 0.592 ..P WKT 2010 08 21 10 19 55 31.3200 -97.3300 251.000 30.0 66.592 4.230 -999.990 -999.990 0.666 ..P WKT 2010 08 21 10 24 55 31.3200 -97.3300 251.000 122.0 73.893 4.530 -999.990 -999.990 0.739 ..P WKT 2010 08 21 10 29 55 31.3200 -97.3300 251.000 457.0 62.708 4.270 -999.990 -999.990 0.627 ..P WKT 2010 08 21 10 34 55 31.3200 -97.3300 251.000 30.0 67.249 4.500 -999.990 -999.990 0.672 ..P WKT 2010 08 21 10 39 55 31.3200 -97.3300 251.000 122.0 76.203 4.260 -999.990 -999.990 0.762 ..P WKT 2010 08 21 10 44 55 31.3200 -97.3300 251.000 457.0 64.192 4.760 -999.990 -999.990 0.642 ..P WKT 2010 08 21 10 54 55 31.3200 -97.3300 251.000 30.0 69.588 4.520 -999.990 -999.990 0.696 ..P WKT 2010 08 21 10 59 55 31.3200 -97.3300 251.000 122.0 70.719 4.150 -999.990 -999.990 0.707 ..P WKT 2010 08 21 11 04 55 31.3200 -97.3300 251.000 457.0 53.375 4.510 -999.990 -999.990 0.534 ..P WKT 2010 08 21 11 09 55 31.3200 -97.3300 251.000 30.0 67.741 4.920 -999.990 -999.990 0.677 ..P WKT 2010 08 21 11 14 55 31.3200 -97.3300 251.000 122.0 66.390 4.320 -999.990 -999.990 0.664 ..P WKT 2010 08 21 11 19 55 31.3200 -97.3300 251.000 457.0 60.630 4.650 -999.990 -999.990 0.606 ..P WKT 2010 08 21 11 29 55 31.3200 -97.3300 251.000 30.0 68.090 4.020 -999.990 -999.990 0.681 ..P WKT 2010 08 21 11 34 55 31.3200 -97.3300 251.000 122.0 74.141 4.610 -999.990 -999.990 0.741 ..P WKT 2010 08 21 11 39 55 31.3200 -97.3300 251.000 457.0 59.249 4.620 -999.990 -999.990 0.592 ..P WKT 2010 08 21 11 44 55 31.3200 -97.3300 251.000 30.0 69.157 4.670 -999.990 -999.990 0.692 ..P WKT 2010 08 21 11 49 55 31.3200 -97.3300 251.000 122.0 71.350 4.600 -999.990 -999.990 0.713 ..P WKT 2010 08 21 12 09 55 31.3200 -97.3300 251.000 457.0 67.643 4.200 -999.990 -999.990 0.676 ..P WKT 2010 08 21 12 10 25 31.3200 -97.3300 251.000 457.0 65.401 4.120 -999.990 -999.990 0.654 ..P WKT 2010 08 21 12 10 55 31.3200 -97.3300 251.000 457.0 68.392 4.200 -999.990 -999.990 0.684 ..P WKT 2010 08 21 12 11 25 31.3200 -97.3300 251.000 457.0 65.049 4.310 -999.990 -999.990 0.650 ..P WKT 2010 08 21 12 11 55 31.3200 -97.3300 251.000 457.0 63.082 4.090 -999.990 -999.990 0.631 ..P WKT 2010 08 21 12 12 25 31.3200 -97.3300 251.000 457.0 63.595 4.130 -999.990 -999.990 0.636 ..P WKT 2010 08 21 12 12 55 31.3200 -97.3300 251.000 457.0 61.904 5.030 -999.990 -999.990 0.619 ..P WKT 2010 08 21 12 13 25 31.3200 -97.3300 251.000 457.0 63.243 5.620 -999.990 -999.990 0.632 ..P WKT 2010 08 21 12 13 55 31.3200 -97.3300 251.000 457.0 63.204 5.560 -999.990 -999.990 0.632 ..P WKT 2010 08 21 12 14 25 31.3200 -97.3300 251.000 457.0 65.093 4.970 -999.990 -999.990 0.651 ..P WKT 2010 08 21 12 14 55 31.3200 -97.3300 251.000 457.0 65.055 4.360 -999.990 -999.990 0.651 ..P WKT 2010 08 21 12 19 55 31.3200 -97.3300 251.000 30.0 74.308 4.770 -999.990 -999.990 0.743 ..P WKT 2010 08 21 12 24 55 31.3200 -97.3300 251.000 122.0 79.430 7.040 -999.990 -999.990 0.794 ..P WKT 2010 08 21 12 29 55 31.3200 -97.3300 251.000 457.0 59.634 4.590 -999.990 -999.990 0.596 ..P WKT 2010 08 21 12 34 55 31.3200 -97.3300 251.000 30.0 80.449 4.390 -999.990 -999.990 0.804 ..P WKT 2010 08 21 12 39 55 31.3200 -97.3300 251.000 122.0 79.789 4.470 -999.990 -999.990 0.798 ..P WKT 2010 08 21 12 44 55 31.3200 -97.3300 251.000 457.0 62.336 4.740 -999.990 -999.990 0.623 ..P WKT 2010 08 21 12 54 55 31.3200 -97.3300 251.000 30.0 68.693 4.220 -999.990 -999.990 0.687 ..P WKT 2010 08 21 12 59 55 31.3200 -97.3300 251.000 122.0 78.737 4.660 -999.990 -999.990 0.787 ..P WKT 2010 08 21 13 04 55 31.3200 -97.3300 251.000 457.0 61.808 4.370 -999.990 -999.990 0.618 ..P WKT 2010 08 21 13 09 55 31.3200 -97.3300 251.000 30.0 74.190 4.580 -999.990 -999.990 0.742 ..P WKT 2010 08 21 13 14 55 31.3200 -97.3300 251.000 122.0 83.130 4.530 -999.990 -999.990 0.831 ..P WKT 2010 08 21 13 19 55 31.3200 -97.3300 251.000 457.0 67.857 4.150 -999.990 -999.990 0.679 ..P WKT 2010 08 21 13 29 55 31.3200 -97.3300 251.000 30.0 82.688 4.230 -999.990 -999.990 0.827 ..P WKT 2010 08 21 13 34 55 31.3200 -97.3300 251.000 122.0 87.892 4.190 -999.990 -999.990 0.879 ..P WKT 2010 08 21 13 39 55 31.3200 -97.3300 251.000 457.0 70.677 4.310 -999.990 -999.990 0.707 ..P WKT 2010 08 21 13 44 55 31.3200 -97.3300 251.000 30.0 83.170 4.600 -999.990 -999.990 0.832 ..P WKT 2010 08 21 13 49 55 31.3200 -97.3300 251.000 122.0 84.935 6.600 -999.990 -999.990 0.849 ..P WKT 2010 08 21 13 54 55 31.3200 -97.3300 251.000 457.0 64.286 4.420 -999.990 -999.990 0.643 ..P WKT 2010 08 21 14 04 55 31.3200 -97.3300 251.000 30.0 69.526 4.720 -999.990 -999.990 0.695 ..P WKT 2010 08 21 14 09 55 31.3200 -97.3300 251.000 122.0 82.623 4.250 -999.990 -999.990 0.826 ..P WKT 2010 08 21 14 14 55 31.3200 -97.3300 251.000 457.0 64.925 4.740 -999.990 -999.990 0.649 ..P WKT 2010 08 21 14 19 55 31.3200 -97.3300 251.000 30.0 76.097 4.390 -999.990 -999.990 0.761 ..P WKT 2010 08 21 14 24 55 31.3200 -97.3300 251.000 122.0 82.181 4.010 -999.990 -999.990 0.822 ..P WKT 2010 08 21 14 29 55 31.3200 -97.3300 251.000 457.0 69.023 4.180 -999.990 -999.990 0.690 ..P WKT 2010 08 21 14 39 55 31.3200 -97.3300 251.000 30.0 75.262 4.020 -999.990 -999.990 0.753 ..P WKT 2010 08 21 14 44 55 31.3200 -97.3300 251.000 122.0 81.462 4.110 -999.990 -999.990 0.815 ..P WKT 2010 08 21 14 49 55 31.3200 -97.3300 251.000 457.0 69.524 3.990 -999.990 -999.990 0.695 ..P WKT 2010 08 21 14 54 55 31.3200 -97.3300 251.000 30.0 71.327 3.850 -999.990 -999.990 0.713 ..P WKT 2010 08 21 14 59 55 31.3200 -97.3300 251.000 122.0 75.603 4.140 -999.990 -999.990 0.756 ..P WKT 2010 08 21 15 04 55 31.3200 -97.3300 251.000 457.0 72.186 3.810 -999.990 -999.990 0.722 ..P WKT 2010 08 21 15 14 55 31.3200 -97.3300 251.000 30.0 67.707 3.730 -999.990 -999.990 0.677 ..P WKT 2010 08 21 15 19 55 31.3200 -97.3300 251.000 122.0 74.337 4.070 -999.990 -999.990 0.743 ..P WKT 2010 08 21 15 24 55 31.3200 -97.3300 251.000 457.0 67.506 4.650 -999.990 -999.990 0.675 ..P WKT 2010 08 21 15 29 55 31.3200 -97.3300 251.000 30.0 68.092 4.640 -999.990 -999.990 0.681 ..P WKT 2010 08 21 15 34 55 31.3200 -97.3300 251.000 122.0 71.975 3.840 -999.990 -999.990 0.720 ..P WKT 2010 08 21 15 39 55 31.3200 -97.3300 251.000 457.0 71.463 4.200 -999.990 -999.990 0.715 ..P WKT 2010 08 21 15 49 55 31.3200 -97.3300 251.000 30.0 66.436 4.890 -999.990 -999.990 0.664 ..P WKT 2010 08 21 15 54 55 31.3200 -97.3300 251.000 122.0 71.533 4.790 -999.990 -999.990 0.715 ..P WKT 2010 08 21 15 59 55 31.3200 -97.3300 251.000 457.0 66.746 4.170 -999.990 -999.990 0.667 ..P WKT 2010 08 21 16 04 55 31.3200 -97.3300 251.000 30.0 67.724 4.430 -999.990 -999.990 0.677 ..P WKT 2010 08 21 16 09 55 31.3200 -97.3300 251.000 122.0 76.114 4.590 -999.990 -999.990 0.761 ..P WKT 2010 08 21 16 14 55 31.3200 -97.3300 251.000 457.0 74.621 4.390 -999.990 -999.990 0.746 ..P WKT 2010 08 21 16 24 55 31.3200 -97.3300 251.000 30.0 70.048 4.310 -999.990 -999.990 0.700 ..P WKT 2010 08 21 16 29 55 31.3200 -97.3300 251.000 122.0 75.476 4.240 -999.990 -999.990 0.755 ..P WKT 2010 08 21 16 34 55 31.3200 -97.3300 251.000 457.0 76.375 4.280 -999.990 -999.990 0.764 ..P WKT 2010 08 21 16 39 55 31.3200 -97.3300 251.000 30.0 74.529 5.210 -999.990 -999.990 0.745 ..P WKT 2010 08 21 16 44 55 31.3200 -97.3300 251.000 122.0 80.917 5.420 -999.990 -999.990 0.809 ..P WKT 2010 08 21 16 49 55 31.3200 -97.3300 251.000 457.0 72.761 4.550 -999.990 -999.990 0.728 ..P WKT 2010 08 21 17 04 55 31.3200 -97.3300 251.000 30.0 73.243 4.950 -999.990 -999.990 0.732 ..P WKT 2010 08 21 17 09 55 31.3200 -97.3300 251.000 122.0 80.921 4.510 -999.990 -999.990 0.809 ..P WKT 2010 08 21 17 14 55 31.3200 -97.3300 251.000 457.0 75.569 4.920 -999.990 -999.990 0.756 ..P WKT 2010 08 21 17 19 55 31.3200 -97.3300 251.000 30.0 72.412 4.980 -999.990 -999.990 0.724 ..P WKT 2010 08 21 17 24 55 31.3200 -97.3300 251.000 122.0 81.872 5.070 -999.990 -999.990 0.819 ..P WKT 2010 08 21 17 29 55 31.3200 -97.3300 251.000 457.0 77.481 5.050 -999.990 -999.990 0.775 ..P WKT 2010 08 21 17 39 55 31.3200 -97.3300 251.000 30.0 76.300 5.430 -999.990 -999.990 0.763 ..P WKT 2010 08 21 17 44 55 31.3200 -97.3300 251.000 122.0 84.444 5.680 -999.990 -999.990 0.844 ..P WKT 2010 08 21 17 49 55 31.3200 -97.3300 251.000 457.0 77.234 5.000 -999.990 -999.990 0.772 ..P WKT 2010 08 21 17 54 55 31.3200 -97.3300 251.000 30.0 75.645 5.130 -999.990 -999.990 0.756 ..P WKT 2010 08 21 17 59 55 31.3200 -97.3300 251.000 122.0 83.103 5.890 -999.990 -999.990 0.831 ..P WKT 2010 08 21 18 04 55 31.3200 -97.3300 251.000 457.0 73.701 4.930 -999.990 -999.990 0.737 ..P WKT 2010 08 21 18 14 55 31.3200 -97.3300 251.000 30.0 77.043 5.000 -999.990 -999.990 0.770 ..P WKT 2010 08 21 18 19 55 31.3200 -97.3300 251.000 122.0 91.839 4.700 -999.990 -999.990 0.918 ..P WKT 2010 08 21 18 24 55 31.3200 -97.3300 251.000 457.0 77.997 4.650 -999.990 -999.990 0.780 ..P WKT 2010 08 21 18 29 55 31.3200 -97.3300 251.000 30.0 80.597 4.900 -999.990 -999.990 0.806 ..P WKT 2010 08 21 18 34 55 31.3200 -97.3300 251.000 122.0 89.225 5.430 -999.990 -999.990 0.892 ..P WKT 2010 08 21 18 39 55 31.3200 -97.3300 251.000 457.0 83.057 5.210 -999.990 -999.990 0.831 ..P WKT 2010 08 21 18 49 55 31.3200 -97.3300 251.000 30.0 79.782 4.640 -999.990 -999.990 0.798 ..P WKT 2010 08 21 18 54 55 31.3200 -97.3300 251.000 122.0 85.414 4.800 -999.990 -999.990 0.854 ..P WKT 2010 08 21 18 59 55 31.3200 -97.3300 251.000 457.0 77.077 4.790 -999.990 -999.990 0.771 ..P WKT 2010 08 21 19 04 55 31.3200 -97.3300 251.000 30.0 76.683 4.560 -999.990 -999.990 0.767 ..P WKT 2010 08 21 19 09 55 31.3200 -97.3300 251.000 122.0 86.695 5.760 -999.990 -999.990 0.867 ..P WKT 2010 08 21 19 14 55 31.3200 -97.3300 251.000 457.0 84.110 4.220 -999.990 -999.990 0.841 ..P WKT 2010 08 21 19 24 55 31.3200 -97.3300 251.000 30.0 79.097 4.060 -999.990 -999.990 0.791 ..P WKT 2010 08 21 19 29 55 31.3200 -97.3300 251.000 122.0 84.882 4.290 -999.990 -999.990 0.849 ..P WKT 2010 08 21 19 34 55 31.3200 -97.3300 251.000 457.0 84.097 4.080 -999.990 -999.990 0.841 ..P WKT 2010 08 21 19 39 55 31.3200 -97.3300 251.000 30.0 82.765 4.600 -999.990 -999.990 0.828 ..P WKT 2010 08 21 19 44 55 31.3200 -97.3300 251.000 122.0 90.465 4.800 -999.990 -999.990 0.905 ..P WKT 2010 08 21 19 49 55 31.3200 -97.3300 251.000 457.0 81.468 4.470 -999.990 -999.990 0.815 ..P WKT 2010 08 21 19 59 55 31.3200 -97.3300 251.000 30.0 81.247 4.400 -999.990 -999.990 0.812 ..P WKT 2010 08 21 20 04 55 31.3200 -97.3300 251.000 122.0 80.715 4.670 -999.990 -999.990 0.807 ..P WKT 2010 08 21 20 09 55 31.3200 -97.3300 251.000 457.0 82.647 5.140 -999.990 -999.990 0.826 ..P WKT 2010 08 21 20 14 55 31.3200 -97.3300 251.000 30.0 86.494 4.670 -999.990 -999.990 0.865 ..P WKT 2010 08 21 20 19 55 31.3200 -97.3300 251.000 122.0 93.214 5.010 -999.990 -999.990 0.932 ..P WKT 2010 08 21 20 24 55 31.3200 -97.3300 251.000 457.0 83.243 4.500 -999.990 -999.990 0.832 ..P WKT 2010 08 21 20 34 55 31.3200 -97.3300 251.000 30.0 91.072 4.900 -999.990 -999.990 0.911 ..P WKT 2010 08 21 20 39 55 31.3200 -97.3300 251.000 122.0 94.234 4.980 -999.990 -999.990 0.942 ..P WKT 2010 08 21 20 44 55 31.3200 -97.3300 251.000 457.0 83.992 4.900 -999.990 -999.990 0.840 ..P WKT 2010 08 21 20 49 55 31.3200 -97.3300 251.000 30.0 84.009 4.150 -999.990 -999.990 0.840 ..P WKT 2010 08 21 20 54 55 31.3200 -97.3300 251.000 122.0 90.316 4.300 -999.990 -999.990 0.903 ..P WKT 2010 08 21 20 59 55 31.3200 -97.3300 251.000 457.0 91.425 4.490 -999.990 -999.990 0.914 ..P WKT 2010 08 21 21 09 55 31.3200 -97.3300 251.000 30.0 80.148 3.990 -999.990 -999.990 0.801 ..P WKT 2010 08 21 21 14 55 31.3200 -97.3300 251.000 122.0 97.976 3.800 -999.990 -999.990 0.980 ..P WKT 2010 08 21 21 19 55 31.3200 -97.3300 251.000 457.0 91.469 4.040 -999.990 -999.990 0.915 ..P WKT 2010 08 21 21 24 55 31.3200 -97.3300 251.000 30.0 80.862 4.540 -999.990 -999.990 0.809 ..P WKT 2010 08 21 21 29 55 31.3200 -97.3300 251.000 122.0 95.542 4.140 -999.990 -999.990 0.955 ..P WKT 2010 08 21 21 34 55 31.3200 -97.3300 251.000 457.0 87.396 4.230 -999.990 -999.990 0.874 ..P WKT 2010 08 21 21 44 55 31.3200 -97.3300 251.000 30.0 91.469 5.460 -999.990 -999.990 0.915 ..P WKT 2010 08 21 21 49 55 31.3200 -97.3300 251.000 122.0 98.766 3.830 -999.990 -999.990 0.988 ..P WKT 2010 08 21 21 54 55 31.3200 -97.3300 251.000 457.0 85.840 3.950 -999.990 -999.990 0.858 ..P WKT 2010 08 21 21 59 55 31.3200 -97.3300 251.000 30.0 85.622 4.630 -999.990 -999.990 0.856 ..P WKT 2010 08 21 22 04 55 31.3200 -97.3300 251.000 122.0 103.847 5.000 -999.990 -999.990 1.038 ..P WKT 2010 08 21 22 09 55 31.3200 -97.3300 251.000 457.0 96.797 4.530 -999.990 -999.990 0.968 ..P WKT 2010 08 21 22 19 55 31.3200 -97.3300 251.000 30.0 89.257 4.160 -999.990 -999.990 0.893 ..P WKT 2010 08 21 22 24 55 31.3200 -97.3300 251.000 122.0 100.512 4.380 -999.990 -999.990 1.005 ..P WKT 2010 08 21 22 29 55 31.3200 -97.3300 251.000 457.0 89.640 3.970 -999.990 -999.990 0.896 ..P WKT 2010 08 21 22 34 55 31.3200 -97.3300 251.000 30.0 86.145 4.170 -999.990 -999.990 0.861 ..P WKT 2010 08 21 22 39 55 31.3200 -97.3300 251.000 122.0 90.023 3.890 -999.990 -999.990 0.900 ..P WKT 2010 08 21 22 44 55 31.3200 -97.3300 251.000 457.0 90.351 4.150 -999.990 -999.990 0.904 ..P WKT 2010 08 21 22 54 55 31.3200 -97.3300 251.000 30.0 89.349 3.840 -999.990 -999.990 0.893 ..P WKT 2010 08 21 22 59 55 31.3200 -97.3300 251.000 122.0 91.296 3.850 -999.990 -999.990 0.913 ..P WKT 2010 08 21 23 04 55 31.3200 -97.3300 251.000 457.0 83.960 4.130 -999.990 -999.990 0.840 ..P WKT 2010 08 21 23 09 55 31.3200 -97.3300 251.000 30.0 83.176 3.980 -999.990 -999.990 0.832 ..P WKT 2010 08 21 23 14 55 31.3200 -97.3300 251.000 122.0 97.680 4.110 -999.990 -999.990 0.977 ..P WKT 2010 08 21 23 19 55 31.3200 -97.3300 251.000 457.0 85.431 3.910 -999.990 -999.990 0.854 ..P WKT 2010 08 21 23 29 55 31.3200 -97.3300 251.000 30.0 83.349 4.210 -999.990 -999.990 0.833 ..P WKT 2010 08 21 23 34 55 31.3200 -97.3300 251.000 122.0 92.146 4.450 -999.990 -999.990 0.921 ..P WKT 2010 08 21 23 39 55 31.3200 -97.3300 251.000 457.0 87.299 4.000 -999.990 -999.990 0.873 ..P WKT 2010 08 21 23 44 55 31.3200 -97.3300 251.000 30.0 84.090 4.020 -999.990 -999.990 0.841 ..P WKT 2010 08 21 23 49 55 31.3200 -97.3300 251.000 122.0 92.067 4.240 -999.990 -999.990 0.921 ..P WKT 2010 08 22 00 09 55 31.3200 -97.3300 251.000 457.0 88.986 4.290 -999.990 -999.990 0.890 ..P WKT 2010 08 22 00 10 25 31.3200 -97.3300 251.000 457.0 86.796 4.350 -999.990 -999.990 0.868 ..P WKT 2010 08 22 00 10 55 31.3200 -97.3300 251.000 457.0 84.607 4.330 -999.990 -999.990 0.846 ..P WKT 2010 08 22 00 11 25 31.3200 -97.3300 251.000 457.0 88.150 4.750 -999.990 -999.990 0.882 ..P WKT 2010 08 22 00 11 55 31.3200 -97.3300 251.000 457.0 82.684 4.090 -999.990 -999.990 0.827 ..P WKT 2010 08 22 00 12 25 31.3200 -97.3300 251.000 457.0 85.135 4.140 -999.990 -999.990 0.851 ..P WKT 2010 08 22 00 12 55 31.3200 -97.3300 251.000 457.0 84.584 4.070 -999.990 -999.990 0.846 ..P WKT 2010 08 22 00 13 25 31.3200 -97.3300 251.000 457.0 80.756 4.700 -999.990 -999.990 0.808 ..P WKT 2010 08 22 00 13 55 31.3200 -97.3300 251.000 457.0 84.026 4.720 -999.990 -999.990 0.840 ..P WKT 2010 08 22 00 14 25 31.3200 -97.3300 251.000 457.0 83.474 5.110 -999.990 -999.990 0.835 ..P WKT 2010 08 22 00 14 55 31.3200 -97.3300 251.000 457.0 86.199 4.480 -999.990 -999.990 0.862 ..P WKT 2010 08 22 00 19 55 31.3200 -97.3300 251.000 30.0 75.490 4.410 -999.990 -999.990 0.755 ..P WKT 2010 08 22 00 24 55 31.3200 -97.3300 251.000 122.0 90.180 3.950 -999.990 -999.990 0.902 ..P WKT 2010 08 22 00 29 55 31.3200 -97.3300 251.000 457.0 80.013 4.630 -999.990 -999.990 0.800 ..P WKT 2010 08 22 00 34 55 31.3200 -97.3300 251.000 30.0 78.177 5.510 -999.990 -999.990 0.782 ..P WKT 2010 08 22 00 39 55 31.3200 -97.3300 251.000 122.0 91.376 4.110 -999.990 -999.990 0.914 ..P WKT 2010 08 22 00 44 55 31.3200 -97.3300 251.000 457.0 82.569 4.040 -999.990 -999.990 0.826 ..P WKT 2010 08 22 00 54 55 31.3200 -97.3300 251.000 30.0 76.522 4.000 -999.990 -999.990 0.765 ..P WKT 2010 08 22 00 59 55 31.3200 -97.3300 251.000 122.0 84.490 4.060 -999.990 -999.990 0.845 ..P WKT 2010 08 22 01 04 55 31.3200 -97.3300 251.000 457.0 81.100 3.700 -999.990 -999.990 0.811 ..P WKT 2010 08 22 01 09 55 31.3200 -97.3300 251.000 30.0 86.608 3.990 -999.990 -999.990 0.866 ..P WKT 2010 08 22 01 14 55 31.3200 -97.3300 251.000 122.0 92.257 3.880 -999.990 -999.990 0.923 ..P WKT 2010 08 22 01 19 55 31.3200 -97.3300 251.000 457.0 81.606 3.760 -999.990 -999.990 0.816 ..P WKT 2010 08 22 01 29 55 31.3200 -97.3300 251.000 30.0 85.684 4.290 -999.990 -999.990 0.857 ..P WKT 2010 08 22 01 34 55 31.3200 -97.3300 251.000 122.0 91.925 3.850 -999.990 -999.990 0.919 ..P WKT 2010 08 22 01 39 55 31.3200 -97.3300 251.000 457.0 89.394 4.190 -999.990 -999.990 0.894 ..P WKT 2010 08 22 01 44 55 31.3200 -97.3300 251.000 30.0 84.940 4.250 -999.990 -999.990 0.849 ..P WKT 2010 08 22 01 49 55 31.3200 -97.3300 251.000 122.0 94.205 3.830 -999.990 -999.990 0.942 ..P WKT 2010 08 22 01 54 55 31.3200 -97.3300 251.000 457.0 81.242 3.820 -999.990 -999.990 0.812 ..P WKT 2010 08 22 02 04 55 31.3200 -97.3300 251.000 30.0 86.975 3.870 -999.990 -999.990 0.870 ..P WKT 2010 08 22 02 09 55 31.3200 -97.3300 251.000 122.0 87.557 5.530 -999.990 -999.990 0.876 ..P WKT 2010 08 22 02 14 55 31.3200 -97.3300 251.000 457.0 78.386 4.180 -999.990 -999.990 0.784 ..P WKT 2010 08 22 02 19 55 31.3200 -97.3300 251.000 30.0 93.122 4.450 -999.990 -999.990 0.931 ..P WKT 2010 08 22 02 24 55 31.3200 -97.3300 251.000 122.0 83.397 4.170 -999.990 -999.990 0.834 ..P WKT 2010 08 22 02 29 55 31.3200 -97.3300 251.000 457.0 78.616 3.910 -999.990 -999.990 0.786 ..P WKT 2010 08 22 02 39 55 31.3200 -97.3300 251.000 30.0 88.958 3.800 -999.990 -999.990 0.890 ..P WKT 2010 08 22 02 44 55 31.3200 -97.3300 251.000 122.0 83.724 4.300 -999.990 -999.990 0.837 ..P WKT 2010 08 22 02 49 55 31.3200 -97.3300 251.000 457.0 77.384 4.700 -999.990 -999.990 0.774 ..P WKT 2010 08 22 02 54 55 31.3200 -97.3300 251.000 30.0 85.638 4.150 -999.990 -999.990 0.856 ..P WKT 2010 08 22 02 59 55 31.3200 -97.3300 251.000 122.0 150.090 4.120 -999.990 -999.990 1.501 ..P WKT 2010 08 22 03 04 55 31.3200 -97.3300 251.000 457.0 123.925 4.240 -999.990 -999.990 1.239 ..P WKT 2010 08 22 03 14 55 31.3200 -97.3300 251.000 30.0 102.272 3.990 -999.990 -999.990 1.023 ..P WKT 2010 08 22 03 19 55 31.3200 -97.3300 251.000 122.0 105.147 3.620 -999.990 -999.990 1.051 ..P WKT 2010 08 22 03 24 55 31.3200 -97.3300 251.000 457.0 108.298 3.660 -999.990 -999.990 1.083 ..P WKT 2010 08 22 03 29 55 31.3200 -97.3300 251.000 30.0 112.555 3.540 -999.990 -999.990 1.126 ..P WKT 2010 08 22 03 34 55 31.3200 -97.3300 251.000 122.0 88.112 3.770 -999.990 -999.990 0.881 ..P WKT 2010 08 22 03 39 55 31.3200 -97.3300 251.000 457.0 84.912 4.120 -999.990 -999.990 0.849 ..P WKT 2010 08 22 03 49 55 31.3200 -97.3300 251.000 30.0 112.085 3.460 -999.990 -999.990 1.121 ..P WKT 2010 08 22 03 54 55 31.3200 -97.3300 251.000 122.0 107.113 3.520 -999.990 -999.990 1.071 ..P WKT 2010 08 22 03 59 55 31.3200 -97.3300 251.000 457.0 77.542 4.340 -999.990 -999.990 0.775 ..P WKT 2010 08 22 04 04 55 31.3200 -97.3300 251.000 30.0 110.706 3.490 -999.990 -999.990 1.107 ..P WKT 2010 08 22 04 09 55 31.3200 -97.3300 251.000 122.0 170.985 5.520 -999.990 -999.990 1.710 ..P WKT 2010 08 22 04 14 55 31.3200 -97.3300 251.000 457.0 83.740 3.490 -999.990 -999.990 0.837 ..P WKT 2010 08 22 04 24 55 31.3200 -97.3300 251.000 30.0 121.896 3.770 -999.990 -999.990 1.219 ..P WKT 2010 08 22 04 29 55 31.3200 -97.3300 251.000 122.0 122.295 3.680 -999.990 -999.990 1.223 ..P WKT 2010 08 22 04 34 55 31.3200 -97.3300 251.000 457.0 83.931 4.020 -999.990 -999.990 0.839 ..P WKT 2010 08 22 04 39 55 31.3200 -97.3300 251.000 30.0 141.650 4.420 -999.990 -999.990 1.417 ..P WKT 2010 08 22 04 44 55 31.3200 -97.3300 251.000 122.0 160.616 4.670 -999.990 -999.990 1.606 ..P WKT 2010 08 22 04 49 55 31.3200 -97.3300 251.000 457.0 83.713 3.770 -999.990 -999.990 0.837 ..P WKT 2010 08 22 05 04 55 31.3200 -97.3300 251.000 30.0 165.635 4.010 -999.990 -999.990 1.656 ..P WKT 2010 08 22 05 09 55 31.3200 -97.3300 251.000 122.0 149.150 3.820 -999.990 -999.990 1.492 ..P WKT 2010 08 22 05 14 55 31.3200 -97.3300 251.000 457.0 90.478 3.500 -999.990 -999.990 0.905 ..P WKT 2010 08 22 05 19 55 31.3200 -97.3300 251.000 30.0 139.745 4.130 -999.990 -999.990 1.397 ..P WKT 2010 08 22 05 24 55 31.3200 -97.3300 251.000 122.0 122.406 3.940 -999.990 -999.990 1.224 ..P WKT 2010 08 22 05 29 55 31.3200 -97.3300 251.000 457.0 79.508 4.450 -999.990 -999.990 0.795 ..P WKT 2010 08 22 05 39 55 31.3200 -97.3300 251.000 30.0 114.925 3.570 -999.990 -999.990 1.149 ..P WKT 2010 08 22 05 44 55 31.3200 -97.3300 251.000 122.0 102.976 5.040 -999.990 -999.990 1.030 ..P WKT 2010 08 22 05 49 55 31.3200 -97.3300 251.000 457.0 80.177 4.280 -999.990 -999.990 0.802 ..P WKT 2010 08 22 05 54 55 31.3200 -97.3300 251.000 30.0 93.101 3.710 -999.990 -999.990 0.931 ..P WKT 2010 08 22 05 59 55 31.3200 -97.3300 251.000 122.0 85.447 4.150 -999.990 -999.990 0.854 ..P WKT 2010 08 22 06 04 55 31.3200 -97.3300 251.000 457.0 79.041 4.200 -999.990 -999.990 0.790 ..P WKT 2010 08 22 06 14 55 31.3200 -97.3300 251.000 30.0 75.207 5.260 -999.990 -999.990 0.752 ..P WKT 2010 08 22 06 19 55 31.3200 -97.3300 251.000 122.0 81.404 4.750 -999.990 -999.990 0.814 ..P WKT 2010 08 22 06 24 55 31.3200 -97.3300 251.000 457.0 87.603 5.120 -999.990 -999.990 0.876 ..P WKT 2010 08 22 06 29 55 31.3200 -97.3300 251.000 30.0 80.712 3.810 -999.990 -999.990 0.807 ..P WKT 2010 08 22 06 34 55 31.3200 -97.3300 251.000 122.0 86.358 4.330 -999.990 -999.990 0.864 ..P WKT 2010 08 22 06 39 55 31.3200 -97.3300 251.000 457.0 82.250 3.180 -999.990 -999.990 0.823 ..P WKT 2010 08 22 06 49 55 31.3200 -97.3300 251.000 30.0 85.344 3.360 -999.990 -999.990 0.853 ..P WKT 2010 08 22 06 54 55 31.3200 -97.3300 251.000 122.0 85.298 3.380 -999.990 -999.990 0.853 ..P WKT 2010 08 22 06 59 55 31.3200 -97.3300 251.000 457.0 73.809 3.060 -999.990 -999.990 0.738 ..P WKT 2010 08 22 07 04 55 31.3200 -97.3300 251.000 30.0 78.227 4.200 -999.990 -999.990 0.782 ..P WKT 2010 08 22 07 09 55 31.3200 -97.3300 251.000 122.0 84.321 3.760 -999.990 -999.990 0.843 ..P WKT 2010 08 22 07 14 55 31.3200 -97.3300 251.000 457.0 79.247 3.210 -999.990 -999.990 0.792 ..P WKT 2010 08 22 07 24 55 31.3200 -97.3300 251.000 30.0 79.551 3.580 -999.990 -999.990 0.796 ..P WKT 2010 08 22 07 29 55 31.3200 -97.3300 251.000 122.0 81.858 3.790 -999.990 -999.990 0.819 ..P WKT 2010 08 22 07 34 55 31.3200 -97.3300 251.000 457.0 75.220 3.430 -999.990 -999.990 0.752 ..P WKT 2010 08 22 07 39 55 31.3200 -97.3300 251.000 30.0 72.215 3.750 -999.990 -999.990 0.722 ..P WKT 2010 08 22 07 44 55 31.3200 -97.3300 251.000 122.0 87.951 4.050 -999.990 -999.990 0.880 ..P WKT 2010 08 22 07 49 55 31.3200 -97.3300 251.000 457.0 74.314 4.430 -999.990 -999.990 0.743 ..P WKT 2010 08 22 07 59 55 31.3200 -97.3300 251.000 30.0 74.935 5.660 -999.990 -999.990 0.749 ..P WKT 2010 08 22 08 04 55 31.3200 -97.3300 251.000 122.0 90.329 4.020 -999.990 -999.990 0.903 ..P WKT 2010 08 22 08 09 55 31.3200 -97.3300 251.000 457.0 75.616 4.500 -999.990 -999.990 0.756 ..P WKT 2010 08 22 08 14 55 31.3200 -97.3300 251.000 30.0 80.372 4.460 -999.990 -999.990 0.804 ..P WKT 2010 08 22 08 19 55 31.3200 -97.3300 251.000 122.0 92.837 5.220 -999.990 -999.990 0.928 ..P WKT 2010 08 22 08 24 55 31.3200 -97.3300 251.000 457.0 73.487 4.580 -999.990 -999.990 0.735 ..P WKT 2010 08 22 08 34 55 31.3200 -97.3300 251.000 30.0 89.518 4.970 -999.990 -999.990 0.895 ..P WKT 2010 08 22 08 39 55 31.3200 -97.3300 251.000 122.0 87.469 4.420 -999.990 -999.990 0.875 ..P WKT 2010 08 22 08 44 55 31.3200 -97.3300 251.000 457.0 74.331 4.590 -999.990 -999.990 0.743 ..P WKT 2010 08 22 08 49 55 31.3200 -97.3300 251.000 30.0 89.683 3.880 -999.990 -999.990 0.897 ..P WKT 2010 08 22 08 54 55 31.3200 -97.3300 251.000 122.0 92.266 3.880 -999.990 -999.990 0.923 ..P WKT 2010 08 22 08 59 55 31.3200 -97.3300 251.000 457.0 74.623 3.720 -999.990 -999.990 0.746 ..P WKT 2010 08 22 09 09 55 31.3200 -97.3300 251.000 30.0 82.495 3.920 -999.990 -999.990 0.825 ..P WKT 2010 08 22 09 14 55 31.3200 -97.3300 251.000 122.0 93.835 3.600 -999.990 -999.990 0.938 ..P WKT 2010 08 22 09 19 55 31.3200 -97.3300 251.000 457.0 71.573 3.730 -999.990 -999.990 0.716 ..P WKT 2010 08 22 09 24 55 31.3200 -97.3300 251.000 30.0 83.197 3.480 -999.990 -999.990 0.832 ..P WKT 2010 08 22 09 29 55 31.3200 -97.3300 251.000 122.0 92.436 3.500 -999.990 -999.990 0.924 ..P WKT 2010 08 22 09 34 55 31.3200 -97.3300 251.000 457.0 77.333 4.530 -999.990 -999.990 0.773 ..P WKT 2010 08 22 09 44 55 31.3200 -97.3300 251.000 30.0 86.910 3.770 -999.990 -999.990 0.869 ..P WKT 2010 08 22 09 49 55 31.3200 -97.3300 251.000 122.0 89.359 3.750 -999.990 -999.990 0.894 ..P WKT 2010 08 22 09 54 55 31.3200 -97.3300 251.000 457.0 76.031 4.490 -999.990 -999.990 0.760 ..P WKT 2010 08 22 09 59 55 31.3200 -97.3300 251.000 30.0 84.678 5.500 -999.990 -999.990 0.847 ..P WKT 2010 08 22 10 04 55 31.3200 -97.3300 251.000 122.0 88.397 4.710 -999.990 -999.990 0.884 ..P WKT 2010 08 22 10 09 55 31.3200 -97.3300 251.000 457.0 68.288 3.700 -999.990 -999.990 0.683 ..P WKT 2010 08 22 10 19 55 31.3200 -97.3300 251.000 30.0 85.801 3.910 -999.990 -999.990 0.858 ..P WKT 2010 08 22 10 24 55 31.3200 -97.3300 251.000 122.0 85.633 3.450 -999.990 -999.990 0.856 ..P WKT 2010 08 22 10 29 55 31.3200 -97.3300 251.000 457.0 75.585 3.430 -999.990 -999.990 0.756 ..P WKT 2010 08 22 10 34 55 31.3200 -97.3300 251.000 30.0 84.450 2.850 -999.990 -999.990 0.845 ..P WKT 2010 08 22 10 39 55 31.3200 -97.3300 251.000 122.0 85.695 3.520 -999.990 -999.990 0.857 ..P WKT 2010 08 22 10 44 55 31.3200 -97.3300 251.000 457.0 76.485 4.550 -999.990 -999.990 0.765 ..P WKT 2010 08 22 10 54 55 31.3200 -97.3300 251.000 30.0 80.385 3.060 -999.990 -999.990 0.804 ..P WKT 2010 08 22 10 59 55 31.3200 -97.3300 251.000 122.0 80.216 2.690 -999.990 -999.990 0.802 ..P WKT 2010 08 22 11 04 55 31.3200 -97.3300 251.000 457.0 67.601 2.850 -999.990 -999.990 0.676 ..P WKT 2010 08 22 11 09 55 31.3200 -97.3300 251.000 30.0 78.180 2.610 -999.990 -999.990 0.782 ..P WKT 2010 08 22 11 14 55 31.3200 -97.3300 251.000 122.0 79.424 2.930 -999.990 -999.990 0.794 ..P WKT 2010 08 22 11 19 55 31.3200 -97.3300 251.000 457.0 77.839 3.340 -999.990 -999.990 0.778 ..P WKT 2010 08 22 11 29 55 31.3200 -97.3300 251.000 30.0 79.932 4.320 -999.990 -999.990 0.799 ..P WKT 2010 08 22 11 34 55 31.3200 -97.3300 251.000 122.0 75.679 4.220 -999.990 -999.990 0.757 ..P WKT 2010 08 22 11 39 55 31.3200 -97.3300 251.000 457.0 74.258 5.000 -999.990 -999.990 0.743 ..P WKT 2010 08 22 11 44 55 31.3200 -97.3300 251.000 30.0 87.011 5.130 -999.990 -999.990 0.870 ..P WKT 2010 08 22 11 49 55 31.3200 -97.3300 251.000 122.0 82.756 3.300 -999.990 -999.990 0.828 ..P WKT 2010 08 22 12 09 55 31.3200 -97.3300 251.000 457.0 67.453 2.970 -999.990 -999.990 0.675 ..P WKT 2010 08 22 12 10 25 31.3200 -97.3300 251.000 457.0 69.885 4.110 -999.990 -999.990 0.699 ..P WKT 2010 08 22 12 10 55 31.3200 -97.3300 251.000 457.0 72.316 2.960 -999.990 -999.990 0.723 ..P WKT 2010 08 22 12 11 25 31.3200 -97.3300 251.000 457.0 71.628 3.580 -999.990 -999.990 0.716 ..P WKT 2010 08 22 12 11 55 31.3200 -97.3300 251.000 457.0 67.961 3.020 -999.990 -999.990 0.680 ..P WKT 2010 08 22 12 12 25 31.3200 -97.3300 251.000 457.0 69.542 2.940 -999.990 -999.990 0.695 ..P WKT 2010 08 22 12 12 55 31.3200 -97.3300 251.000 457.0 72.824 3.790 -999.990 -999.990 0.728 ..P WKT 2010 08 22 12 13 25 31.3200 -97.3300 251.000 457.0 75.539 3.260 -999.990 -999.990 0.755 ..P WKT 2010 08 22 12 13 55 31.3200 -97.3300 251.000 457.0 75.134 3.000 -999.990 -999.990 0.751 ..P WKT 2010 08 22 12 14 25 31.3200 -97.3300 251.000 457.0 72.461 2.960 -999.990 -999.990 0.725 ..P WKT 2010 08 22 12 14 55 31.3200 -97.3300 251.000 457.0 72.765 3.030 -999.990 -999.990 0.728 ..P WKT 2010 08 22 12 19 55 31.3200 -97.3300 251.000 30.0 79.209 3.160 -999.990 -999.990 0.792 ..P WKT 2010 08 22 12 24 55 31.3200 -97.3300 251.000 122.0 85.224 4.600 -999.990 -999.990 0.852 ..P WKT 2010 08 22 12 29 55 31.3200 -97.3300 251.000 457.0 81.177 3.420 -999.990 -999.990 0.812 ..P WKT 2010 08 22 12 34 55 31.3200 -97.3300 251.000 30.0 79.541 3.250 -999.990 -999.990 0.795 ..P WKT 2010 08 22 12 39 55 31.3200 -97.3300 251.000 122.0 90.933 4.210 -999.990 -999.990 0.909 ..P WKT 2010 08 22 12 44 55 31.3200 -97.3300 251.000 457.0 76.695 3.660 -999.990 -999.990 0.767 ..P WKT 2010 08 22 12 54 55 31.3200 -97.3300 251.000 30.0 79.348 4.260 -999.990 -999.990 0.793 ..P WKT 2010 08 22 12 59 55 31.3200 -97.3300 251.000 122.0 86.605 4.820 -999.990 -999.990 0.866 ..P WKT 2010 08 22 13 04 55 31.3200 -97.3300 251.000 457.0 75.470 3.050 -999.990 -999.990 0.755 ..P WKT 2010 08 22 13 09 55 31.3200 -97.3300 251.000 30.0 83.714 2.710 -999.990 -999.990 0.837 ..P WKT 2010 08 22 13 14 55 31.3200 -97.3300 251.000 122.0 86.017 2.490 -999.990 -999.990 0.860 ..P WKT 2010 08 22 13 19 55 31.3200 -97.3300 251.000 457.0 78.988 2.750 -999.990 -999.990 0.790 ..P WKT 2010 08 22 13 29 55 31.3200 -97.3300 251.000 30.0 83.572 2.350 -999.990 -999.990 0.836 ..P WKT 2010 08 22 13 34 55 31.3200 -97.3300 251.000 122.0 92.068 4.170 -999.990 -999.990 0.921 ..P WKT 2010 08 22 13 39 55 31.3200 -97.3300 251.000 457.0 78.527 3.110 -999.990 -999.990 0.785 ..P WKT 2010 08 22 13 44 55 31.3200 -97.3300 251.000 30.0 84.338 3.550 -999.990 -999.990 0.843 ..P WKT 2010 08 22 13 49 55 31.3200 -97.3300 251.000 122.0 97.204 3.240 -999.990 -999.990 0.972 ..P WKT 2010 08 22 13 54 55 31.3200 -97.3300 251.000 457.0 75.486 2.340 -999.990 -999.990 0.755 ..P WKT 2010 08 22 14 04 55 31.3200 -97.3300 251.000 30.0 86.170 2.560 -999.990 -999.990 0.862 ..P WKT 2010 08 22 14 09 55 31.3200 -97.3300 251.000 122.0 89.917 3.250 -999.990 -999.990 0.899 ..P WKT 2010 08 22 14 14 55 31.3200 -97.3300 251.000 457.0 73.074 3.260 -999.990 -999.990 0.731 ..P WKT 2010 08 22 14 19 55 31.3200 -97.3300 251.000 30.0 89.793 3.590 -999.990 -999.990 0.898 ..P WKT 2010 08 22 14 24 55 31.3200 -97.3300 251.000 122.0 105.095 3.670 -999.990 -999.990 1.051 ..P WKT 2010 08 22 14 29 55 31.3200 -97.3300 251.000 457.0 84.878 2.240 -999.990 -999.990 0.849 ..P WKT 2010 08 22 14 39 55 31.3200 -97.3300 251.000 30.0 85.601 3.560 -999.990 -999.990 0.856 ..P WKT 2010 08 22 14 44 55 31.3200 -97.3300 251.000 122.0 96.102 3.870 -999.990 -999.990 0.961 ..P WKT 2010 08 22 14 49 55 31.3200 -97.3300 251.000 457.0 83.789 3.620 -999.990 -999.990 0.838 ..P WKT 2010 08 22 14 54 55 31.3200 -97.3300 251.000 30.0 85.278 2.970 -999.990 -999.990 0.853 ..P WKT 2010 08 22 14 59 55 31.3200 -97.3300 251.000 122.0 94.646 2.380 -999.990 -999.990 0.946 ..P WKT 2010 08 22 15 04 55 31.3200 -97.3300 251.000 457.0 81.779 5.730 -999.990 -999.990 0.818 ..P WKT 2010 08 22 15 14 55 31.3200 -97.3300 251.000 30.0 83.949 2.490 -999.990 -999.990 0.839 ..P WKT 2010 08 22 15 19 55 31.3200 -97.3300 251.000 122.0 97.287 2.240 -999.990 -999.990 0.973 ..P WKT 2010 08 22 15 24 55 31.3200 -97.3300 251.000 457.0 87.564 3.560 -999.990 -999.990 0.876 ..P WKT 2010 08 22 15 29 55 31.3200 -97.3300 251.000 30.0 87.402 5.650 -999.990 -999.990 0.874 ..P WKT 2010 08 22 15 34 55 31.3200 -97.3300 251.000 122.0 96.514 3.620 -999.990 -999.990 0.965 ..P WKT 2010 08 22 15 39 55 31.3200 -97.3300 251.000 457.0 87.641 2.890 -999.990 -999.990 0.876 ..P WKT 2010 08 22 15 49 55 31.3200 -97.3300 251.000 30.0 86.274 2.430 -999.990 -999.990 0.863 ..P WKT 2010 08 22 15 54 55 31.3200 -97.3300 251.000 122.0 96.302 3.730 -999.990 -999.990 0.963 ..P WKT 2010 08 22 15 59 55 31.3200 -97.3300 251.000 457.0 92.709 4.070 -999.990 -999.990 0.927 ..P WKT 2010 08 22 16 04 55 31.3200 -97.3300 251.000 30.0 89.399 4.730 -999.990 -999.990 0.894 ..P WKT 2010 08 22 16 09 55 31.3200 -97.3300 251.000 122.0 97.455 4.110 -999.990 -999.990 0.975 ..P WKT 2010 08 22 16 14 55 31.3200 -97.3300 251.000 457.0 94.286 3.200 -999.990 -999.990 0.943 ..P WKT 2010 08 22 16 24 55 31.3200 -97.3300 251.000 30.0 91.557 2.720 -999.990 -999.990 0.916 ..P WKT 2010 08 22 16 29 55 31.3200 -97.3300 251.000 122.0 107.274 4.330 -999.990 -999.990 1.073 ..P WKT 2010 08 22 16 34 55 31.3200 -97.3300 251.000 457.0 94.396 5.220 -999.990 -999.990 0.944 ..P WKT 2010 08 22 16 39 55 31.3200 -97.3300 251.000 30.0 92.312 3.960 -999.990 -999.990 0.923 ..P WKT 2010 08 22 16 44 55 31.3200 -97.3300 251.000 122.0 97.933 3.030 -999.990 -999.990 0.979 ..P WKT 2010 08 22 16 49 55 31.3200 -97.3300 251.000 457.0 86.886 2.490 -999.990 -999.990 0.869 ..P WKT 2010 08 22 17 04 55 31.3200 -97.3300 251.000 30.0 87.148 3.070 -999.990 -999.990 0.871 ..P WKT 2010 08 22 17 09 55 31.3200 -97.3300 251.000 122.0 92.727 2.720 -999.990 -999.990 0.927 ..P WKT 2010 08 22 17 14 55 31.3200 -97.3300 251.000 457.0 86.132 3.240 -999.990 -999.990 0.861 ..P WKT 2010 08 22 17 19 55 31.3200 -97.3300 251.000 30.0 90.030 4.090 -999.990 -999.990 0.900 ..P WKT 2010 08 22 17 24 55 31.3200 -97.3300 251.000 122.0 102.036 2.470 -999.990 -999.990 1.020 ..P WKT 2010 08 22 17 29 55 31.3200 -97.3300 251.000 457.0 88.035 3.130 -999.990 -999.990 0.880 ..P WKT 2010 08 22 17 39 55 31.3200 -97.3300 251.000 30.0 97.237 2.900 -999.990 -999.990 0.972 ..P WKT 2010 08 22 17 44 55 31.3200 -97.3300 251.000 122.0 99.749 2.840 -999.990 -999.990 0.997 ..P WKT 2010 08 22 17 49 55 31.3200 -97.3300 251.000 457.0 92.762 3.330 -999.990 -999.990 0.928 ..P WKT 2010 08 22 17 54 55 31.3200 -97.3300 251.000 30.0 82.147 4.440 -999.990 -999.990 0.821 ..P WKT 2010 08 22 17 59 55 31.3200 -97.3300 251.000 122.0 103.089 3.520 -999.990 -999.990 1.031 ..P WKT 2010 08 22 18 04 55 31.3200 -97.3300 251.000 457.0 91.220 2.800 -999.990 -999.990 0.912 ..P WKT 2010 08 22 18 14 55 31.3200 -97.3300 251.000 30.0 88.964 2.330 -999.990 -999.990 0.890 ..P WKT 2010 08 22 18 19 55 31.3200 -97.3300 251.000 122.0 101.636 2.840 -999.990 -999.990 1.016 ..P WKT 2010 08 22 18 24 55 31.3200 -97.3300 251.000 457.0 87.249 4.300 -999.990 -999.990 0.872 ..P WKT 2010 08 22 18 29 55 31.3200 -97.3300 251.000 30.0 84.858 5.340 -999.990 -999.990 0.849 ..P WKT 2010 08 22 18 34 55 31.3200 -97.3300 251.000 122.0 95.849 4.650 -999.990 -999.990 0.958 ..P WKT 2010 08 22 18 39 55 31.3200 -97.3300 251.000 457.0 77.570 2.870 -999.990 -999.990 0.776 ..P WKT 2010 08 22 18 49 55 31.3200 -97.3300 251.000 30.0 79.204 2.930 -999.990 -999.990 0.792 ..P WKT 2010 08 22 18 54 55 31.3200 -97.3300 251.000 122.0 92.416 4.290 -999.990 -999.990 0.924 ..P WKT 2010 08 22 18 59 55 31.3200 -97.3300 251.000 457.0 86.407 5.070 -999.990 -999.990 0.864 ..P WKT 2010 08 22 19 04 55 31.3200 -97.3300 251.000 30.0 79.287 4.150 -999.990 -999.990 0.793 ..P WKT 2010 08 22 19 09 55 31.3200 -97.3300 251.000 122.0 97.499 3.370 -999.990 -999.990 0.975 ..P WKT 2010 08 22 19 14 55 31.3200 -97.3300 251.000 457.0 82.866 2.590 -999.990 -999.990 0.829 ..P WKT 2010 08 22 19 24 55 31.3200 -97.3300 251.000 30.0 89.344 2.690 -999.990 -999.990 0.893 ..P WKT 2010 08 22 19 29 55 31.3200 -97.3300 251.000 122.0 100.148 1.820 -999.990 -999.990 1.001 ..P WKT 2010 08 22 19 34 55 31.3200 -97.3300 251.000 457.0 89.540 2.920 -999.990 -999.990 0.895 ..P WKT 2010 08 22 19 39 55 31.3200 -97.3300 251.000 30.0 93.112 1.810 -999.990 -999.990 0.931 ..P WKT 2010 08 22 19 44 55 31.3200 -97.3300 251.000 122.0 101.964 1.960 -999.990 -999.990 1.020 ..P WKT 2010 08 22 19 49 55 31.3200 -97.3300 251.000 457.0 89.972 2.790 -999.990 -999.990 0.900 ..P WKT 2010 08 22 19 59 55 31.3200 -97.3300 251.000 30.0 88.144 3.070 -999.990 -999.990 0.881 ..P WKT 2010 08 22 20 04 55 31.3200 -97.3300 251.000 122.0 107.322 2.880 -999.990 -999.990 1.073 ..P WKT 2010 08 22 20 09 55 31.3200 -97.3300 251.000 457.0 93.734 2.610 -999.990 -999.990 0.937 ..P WKT 2010 08 22 20 14 55 31.3200 -97.3300 251.000 30.0 89.866 2.850 -999.990 -999.990 0.899 ..P WKT 2010 08 22 20 19 55 31.3200 -97.3300 251.000 122.0 100.983 3.030 -999.990 -999.990 1.010 ..P WKT 2010 08 22 20 24 55 31.3200 -97.3300 251.000 457.0 85.603 3.420 -999.990 -999.990 0.856 ..P WKT 2010 08 22 20 34 55 31.3200 -97.3300 251.000 30.0 91.801 4.490 -999.990 -999.990 0.918 ..P WKT 2010 08 22 20 39 55 31.3200 -97.3300 251.000 122.0 99.779 2.620 -999.990 -999.990 0.998 ..P WKT 2010 08 22 20 44 55 31.3200 -97.3300 251.000 457.0 90.570 2.700 -999.990 -999.990 0.906 ..P WKT 2010 08 22 20 49 55 31.3200 -97.3300 251.000 30.0 81.503 4.500 -999.990 -999.990 0.815 ..P WKT 2010 08 22 20 54 55 31.3200 -97.3300 251.000 122.0 108.457 3.430 -999.990 -999.990 1.085 ..P WKT 2010 08 22 20 59 55 31.3200 -97.3300 251.000 457.0 92.188 2.670 -999.990 -999.990 0.922 ..P WKT 2010 08 22 21 09 55 31.3200 -97.3300 251.000 30.0 88.071 2.650 -999.990 -999.990 0.881 ..P WKT 2010 08 22 21 14 55 31.3200 -97.3300 251.000 122.0 102.977 2.890 -999.990 -999.990 1.030 ..P WKT 2010 08 22 21 19 55 31.3200 -97.3300 251.000 457.0 86.468 3.230 -999.990 -999.990 0.865 ..P WKT 2010 08 22 21 24 55 31.3200 -97.3300 251.000 30.0 85.182 3.400 -999.990 -999.990 0.852 ..P WKT 2010 08 22 21 29 55 31.3200 -97.3300 251.000 122.0 98.696 2.960 -999.990 -999.990 0.987 ..P WKT 2010 08 22 21 34 55 31.3200 -97.3300 251.000 457.0 84.135 3.420 -999.990 -999.990 0.841 ..P WKT 2010 08 22 21 44 55 31.3200 -97.3300 251.000 30.0 81.192 3.400 -999.990 -999.990 0.812 ..P WKT 2010 08 22 21 49 55 31.3200 -97.3300 251.000 122.0 91.833 4.070 -999.990 -999.990 0.918 ..P WKT 2010 08 22 21 54 55 31.3200 -97.3300 251.000 457.0 86.305 2.490 -999.990 -999.990 0.863 ..P WKT 2010 08 22 21 59 55 31.3200 -97.3300 251.000 30.0 87.686 3.130 -999.990 -999.990 0.877 ..P WKT 2010 08 22 22 04 55 31.3200 -97.3300 251.000 122.0 95.694 2.180 -999.990 -999.990 0.957 ..P WKT 2010 08 22 22 09 55 31.3200 -97.3300 251.000 457.0 88.788 3.010 -999.990 -999.990 0.888 ..P WKT 2010 08 22 22 19 55 31.3200 -97.3300 251.000 30.0 80.743 2.910 -999.990 -999.990 0.807 ..P WKT 2010 08 22 22 24 55 31.3200 -97.3300 251.000 122.0 98.364 3.160 -999.990 -999.990 0.984 ..P WKT 2010 08 22 22 29 55 31.3200 -97.3300 251.000 457.0 87.562 3.430 -999.990 -999.990 0.876 ..P WKT 2010 08 22 22 34 55 31.3200 -97.3300 251.000 30.0 82.557 4.060 -999.990 -999.990 0.826 ..P WKT 2010 08 22 22 39 55 31.3200 -97.3300 251.000 122.0 92.996 2.900 -999.990 -999.990 0.930 ..P WKT 2010 08 22 22 44 55 31.3200 -97.3300 251.000 457.0 90.198 2.230 -999.990 -999.990 0.902 ..P WKT 2010 08 22 22 54 55 31.3200 -97.3300 251.000 30.0 84.290 2.560 -999.990 -999.990 0.843 ..P WKT 2010 08 22 22 59 55 31.3200 -97.3300 251.000 122.0 104.324 3.460 -999.990 -999.990 1.043 ..P WKT 2010 08 22 23 04 55 31.3200 -97.3300 251.000 457.0 86.061 3.800 -999.990 -999.990 0.861 ..P WKT 2010 08 22 23 09 55 31.3200 -97.3300 251.000 30.0 81.300 3.900 -999.990 -999.990 0.813 ..P WKT 2010 08 22 23 14 55 31.3200 -97.3300 251.000 122.0 91.134 2.940 -999.990 -999.990 0.911 ..P WKT 2010 08 22 23 19 55 31.3200 -97.3300 251.000 457.0 84.172 2.420 -999.990 -999.990 0.842 ..P WKT 2010 08 22 23 29 55 31.3200 -97.3300 251.000 30.0 75.941 1.560 -999.990 -999.990 0.759 ..P WKT 2010 08 22 23 34 55 31.3200 -97.3300 251.000 122.0 82.373 2.680 -999.990 -999.990 0.824 ..P WKT 2010 08 22 23 39 55 31.3200 -97.3300 251.000 457.0 79.727 3.230 -999.990 -999.990 0.797 ..P WKT 2010 08 22 23 44 55 31.3200 -97.3300 251.000 30.0 81.480 5.380 -999.990 -999.990 0.815 ..P WKT 2010 08 22 23 49 55 31.3200 -97.3300 251.000 122.0 85.983 2.260 -999.990 -999.990 0.860 ..P WKT 2010 08 23 00 09 55 31.3200 -97.3300 251.000 457.0 95.917 3.890 -999.990 -999.990 0.959 ..P WKT 2010 08 23 00 10 25 31.3200 -97.3300 251.000 457.0 92.529 2.790 -999.990 -999.990 0.925 ..P WKT 2010 08 23 00 10 55 31.3200 -97.3300 251.000 457.0 93.812 2.040 -999.990 -999.990 0.938 ..P WKT 2010 08 23 00 11 25 31.3200 -97.3300 251.000 457.0 91.386 2.300 -999.990 -999.990 0.914 ..P WKT 2010 08 23 00 11 55 31.3200 -97.3300 251.000 457.0 94.043 2.160 -999.990 -999.990 0.940 ..P WKT 2010 08 23 00 12 25 31.3200 -97.3300 251.000 457.0 95.189 2.140 -999.990 -999.990 0.952 ..P WKT 2010 08 23 00 12 55 31.3200 -97.3300 251.000 457.0 95.098 2.060 -999.990 -999.990 0.951 ..P WKT 2010 08 23 00 13 25 31.3200 -97.3300 251.000 457.0 93.771 2.370 -999.990 -999.990 0.938 ..P WKT 2010 08 23 00 13 55 31.3200 -97.3300 251.000 457.0 91.207 2.350 -999.990 -999.990 0.912 ..P WKT 2010 08 23 00 14 25 31.3200 -97.3300 251.000 457.0 89.880 2.240 -999.990 -999.990 0.899 ..P WKT 2010 08 23 00 14 55 31.3200 -97.3300 251.000 457.0 90.202 2.440 -999.990 -999.990 0.902 ..P WKT 2010 08 23 00 19 55 31.3200 -97.3300 251.000 30.0 89.845 2.400 -999.990 -999.990 0.898 ..P WKT 2010 08 23 00 24 55 31.3200 -97.3300 251.000 122.0 106.381 2.840 -999.990 -999.990 1.064 ..P WKT 2010 08 23 00 29 55 31.3200 -97.3300 251.000 457.0 95.311 2.520 -999.990 -999.990 0.953 ..P WKT 2010 08 23 00 34 55 31.3200 -97.3300 251.000 30.0 98.111 2.940 -999.990 -999.990 0.981 ..P WKT 2010 08 23 00 39 55 31.3200 -97.3300 251.000 122.0 104.207 3.290 -999.990 -999.990 1.042 ..P WKT 2010 08 23 00 44 55 31.3200 -97.3300 251.000 457.0 103.986 2.970 -999.990 -999.990 1.040 ..P WKT 2010 08 23 00 54 55 31.3200 -97.3300 251.000 30.0 100.880 2.910 -999.990 -999.990 1.009 ..P WKT 2010 08 23 00 59 55 31.3200 -97.3300 251.000 122.0 109.112 4.650 -999.990 -999.990 1.091 ..P WKT 2010 08 23 01 04 55 31.3200 -97.3300 251.000 457.0 105.540 2.600 -999.990 -999.990 1.055 ..P WKT 2010 08 23 01 09 55 31.3200 -97.3300 251.000 30.0 98.264 1.880 -999.990 -999.990 0.983 ..P WKT 2010 08 23 01 14 55 31.3200 -97.3300 251.000 122.0 109.789 3.540 -999.990 -999.990 1.098 ..P WKT 2010 08 23 01 19 55 31.3200 -97.3300 251.000 457.0 101.278 3.930 -999.990 -999.990 1.013 ..P WKT 2010 08 23 01 29 55 31.3200 -97.3300 251.000 30.0 106.309 1.710 -999.990 -999.990 1.063 ..P WKT 2010 08 23 01 34 55 31.3200 -97.3300 251.000 122.0 104.072 1.870 -999.990 -999.990 1.041 ..P WKT 2010 08 23 01 39 55 31.3200 -97.3300 251.000 457.0 98.269 2.070 -999.990 -999.990 0.983 ..P WKT 2010 08 23 01 44 55 31.3200 -97.3300 251.000 30.0 96.033 2.680 -999.990 -999.990 0.960 ..P WKT 2010 08 23 01 49 55 31.3200 -97.3300 251.000 122.0 99.968 2.420 -999.990 -999.990 1.000 ..P WKT 2010 08 23 01 54 55 31.3200 -97.3300 251.000 457.0 102.258 2.980 -999.990 -999.990 1.023 ..P WKT 2010 08 23 02 04 55 31.3200 -97.3300 251.000 30.0 104.270 3.120 -999.990 -999.990 1.043 ..P WKT 2010 08 23 02 09 55 31.3200 -97.3300 251.000 122.0 104.130 2.750 -999.990 -999.990 1.041 ..P WKT 2010 08 23 02 14 55 31.3200 -97.3300 251.000 457.0 97.410 2.890 -999.990 -999.990 0.974 ..P WKT 2010 08 23 02 19 55 31.3200 -97.3300 251.000 30.0 105.221 2.510 -999.990 -999.990 1.052 ..P WKT 2010 08 23 02 24 55 31.3200 -97.3300 251.000 122.0 117.690 2.220 -999.990 -999.990 1.177 ..P WKT 2010 08 23 02 29 55 31.3200 -97.3300 251.000 457.0 103.022 2.200 -999.990 -999.990 1.030 ..P WKT 2010 08 23 02 39 55 31.3200 -97.3300 251.000 30.0 112.060 2.080 -999.990 -999.990 1.121 ..P WKT 2010 08 23 02 44 55 31.3200 -97.3300 251.000 122.0 105.342 2.310 -999.990 -999.990 1.053 ..P WKT 2010 08 23 02 49 55 31.3200 -97.3300 251.000 457.0 105.203 3.020 -999.990 -999.990 1.052 ..P WKT 2010 08 23 02 54 55 31.3200 -97.3300 251.000 30.0 109.720 2.600 -999.990 -999.990 1.097 ..P WKT 2010 08 23 02 59 55 31.3200 -97.3300 251.000 122.0 92.047 2.670 -999.990 -999.990 0.920 ..P WKT 2010 08 23 03 04 55 31.3200 -97.3300 251.000 457.0 101.221 2.850 -999.990 -999.990 1.012 ..P WKT 2010 08 23 03 14 55 31.3200 -97.3300 251.000 30.0 111.662 2.820 -999.990 -999.990 1.117 ..P WKT 2010 08 23 03 19 55 31.3200 -97.3300 251.000 122.0 96.499 3.800 -999.990 -999.990 0.965 ..P WKT 2010 08 23 03 24 55 31.3200 -97.3300 251.000 457.0 103.518 4.570 -999.990 -999.990 1.035 ..P WKT 2010 08 23 03 29 55 31.3200 -97.3300 251.000 30.0 114.644 3.760 -999.990 -999.990 1.146 ..P WKT 2010 08 23 03 34 55 31.3200 -97.3300 251.000 122.0 101.675 2.820 -999.990 -999.990 1.017 ..P WKT 2010 08 23 03 39 55 31.3200 -97.3300 251.000 457.0 105.681 2.780 -999.990 -999.990 1.057 ..P WKT 2010 08 23 03 49 55 31.3200 -97.3300 251.000 30.0 109.291 2.410 -999.990 -999.990 1.093 ..P WKT 2010 08 23 03 54 55 31.3200 -97.3300 251.000 122.0 92.339 2.850 -999.990 -999.990 0.923 ..P WKT 2010 08 23 03 59 55 31.3200 -97.3300 251.000 457.0 102.482 2.650 -999.990 -999.990 1.025 ..P WKT 2010 08 23 04 04 55 31.3200 -97.3300 251.000 30.0 111.119 3.460 -999.990 -999.990 1.111 ..P WKT 2010 08 23 04 09 55 31.3200 -97.3300 251.000 122.0 105.115 2.950 -999.990 -999.990 1.051 ..P WKT 2010 08 23 04 14 55 31.3200 -97.3300 251.000 457.0 96.650 4.770 -999.990 -999.990 0.967 ..P WKT 2010 08 23 04 24 55 31.3200 -97.3300 251.000 30.0 109.796 2.600 -999.990 -999.990 1.098 ..P WKT 2010 08 23 04 29 55 31.3200 -97.3300 251.000 122.0 102.133 2.930 -999.990 -999.990 1.021 ..P WKT 2010 08 23 04 34 55 31.3200 -97.3300 251.000 457.0 100.900 3.360 -999.990 -999.990 1.009 ..P WKT 2010 08 23 04 39 55 31.3200 -97.3300 251.000 30.0 99.256 2.920 -999.990 -999.990 0.993 ..P WKT 2010 08 23 04 44 55 31.3200 -97.3300 251.000 122.0 93.785 1.840 -999.990 -999.990 0.938 ..P WKT 2010 08 23 04 49 55 31.3200 -97.3300 251.000 457.0 94.876 2.090 -999.990 -999.990 0.949 ..P WKT 2010 08 23 05 04 55 31.3200 -97.3300 251.000 30.0 88.646 2.170 -999.990 -999.990 0.886 ..P WKT 2010 08 23 05 09 55 31.3200 -97.3300 251.000 122.0 82.048 1.800 -999.990 -999.990 0.820 ..P WKT 2010 08 23 05 14 55 31.3200 -97.3300 251.000 457.0 84.607 3.450 -999.990 -999.990 0.846 ..P WKT 2010 08 23 05 19 55 31.3200 -97.3300 251.000 30.0 86.755 3.980 -999.990 -999.990 0.868 ..P WKT 2010 08 23 05 24 55 31.3200 -97.3300 251.000 122.0 87.401 3.050 -999.990 -999.990 0.874 ..P WKT 2010 08 23 05 29 55 31.3200 -97.3300 251.000 457.0 85.313 2.350 -999.990 -999.990 0.853 ..P WKT 2010 08 23 05 39 55 31.3200 -97.3300 251.000 30.0 89.431 2.030 -999.990 -999.990 0.894 ..P WKT 2010 08 23 05 44 55 31.3200 -97.3300 251.000 122.0 86.346 2.200 -999.990 -999.990 0.863 ..P WKT 2010 08 23 05 49 55 31.3200 -97.3300 251.000 457.0 79.301 2.640 -999.990 -999.990 0.793 ..P WKT 2010 08 23 05 54 55 31.3200 -97.3300 251.000 30.0 87.826 3.320 -999.990 -999.990 0.878 ..P WKT 2010 08 23 05 59 55 31.3200 -97.3300 251.000 122.0 92.526 2.310 -999.990 -999.990 0.925 ..P WKT 2010 08 23 06 04 55 31.3200 -97.3300 251.000 457.0 91.490 2.990 -999.990 -999.990 0.915 ..P WKT 2010 08 23 06 14 55 31.3200 -97.3300 251.000 30.0 86.221 2.940 -999.990 -999.990 0.862 ..P WKT 2010 08 23 06 19 55 31.3200 -97.3300 251.000 122.0 91.270 3.220 -999.990 -999.990 0.913 ..P WKT 2010 08 23 06 24 55 31.3200 -97.3300 251.000 457.0 92.496 3.730 -999.990 -999.990 0.925 ..P WKT 2010 08 23 06 29 55 31.3200 -97.3300 251.000 30.0 93.450 3.760 -999.990 -999.990 0.934 ..P WKT 2010 08 23 06 34 55 31.3200 -97.3300 251.000 122.0 93.311 3.340 -999.990 -999.990 0.933 ..P WKT 2010 08 23 06 39 55 31.3200 -97.3300 251.000 457.0 87.715 3.870 -999.990 -999.990 0.877 ..P WKT 2010 08 23 06 49 55 31.3200 -97.3300 251.000 30.0 84.242 3.360 -999.990 -999.990 0.842 ..P WKT 2010 08 23 06 54 55 31.3200 -97.3300 251.000 122.0 112.285 4.190 -999.990 -999.990 1.123 ..P WKT 2010 08 23 06 59 55 31.3200 -97.3300 251.000 457.0 78.940 4.640 -999.990 -999.990 0.789 ..P WKT 2010 08 23 07 04 55 31.3200 -97.3300 251.000 30.0 90.611 2.990 -999.990 -999.990 0.906 ..P WKT 2010 08 23 07 09 55 31.3200 -97.3300 251.000 122.0 106.643 2.560 -999.990 -999.990 1.066 ..P WKT 2010 08 23 07 14 55 31.3200 -97.3300 251.000 457.0 80.945 2.140 -999.990 -999.990 0.809 ..P WKT 2010 08 23 07 24 55 31.3200 -97.3300 251.000 30.0 88.403 1.670 -999.990 -999.990 0.884 ..P WKT 2010 08 23 07 29 55 31.3200 -97.3300 251.000 122.0 103.826 3.640 -999.990 -999.990 1.038 ..P WKT 2010 08 23 07 34 55 31.3200 -97.3300 251.000 457.0 90.347 3.630 -999.990 -999.990 0.903 ..P WKT 2010 08 23 07 39 55 31.3200 -97.3300 251.000 30.0 88.866 5.120 -999.990 -999.990 0.889 ..P WKT 2010 08 23 07 44 55 31.3200 -97.3300 251.000 122.0 101.151 4.570 -999.990 -999.990 1.012 ..P WKT 2010 08 23 07 49 55 31.3200 -97.3300 251.000 457.0 83.995 2.670 -999.990 -999.990 0.840 ..P WKT 2010 08 23 07 59 55 31.3200 -97.3300 251.000 30.0 97.503 3.230 -999.990 -999.990 0.975 ..P WKT 2010 08 23 08 04 55 31.3200 -97.3300 251.000 122.0 112.760 4.750 -999.990 -999.990 1.128 ..P WKT 2010 08 23 08 09 55 31.3200 -97.3300 251.000 457.0 82.921 5.050 -999.990 -999.990 0.829 ..P WKT 2010 08 23 08 14 55 31.3200 -97.3300 251.000 30.0 99.539 3.960 -999.990 -999.990 0.995 ..P WKT 2010 08 23 08 19 55 31.3200 -97.3300 251.000 122.0 105.258 3.940 -999.990 -999.990 1.053 ..P WKT 2010 08 23 08 24 55 31.3200 -97.3300 251.000 457.0 80.466 3.570 -999.990 -999.990 0.805 ..P WKT 2010 08 23 08 34 55 31.3200 -97.3300 251.000 30.0 101.572 3.520 -999.990 -999.990 1.016 ..P WKT 2010 08 23 08 39 55 31.3200 -97.3300 251.000 122.0 106.471 3.610 -999.990 -999.990 1.065 ..P WKT 2010 08 23 08 44 55 31.3200 -97.3300 251.000 457.0 85.636 2.760 -999.990 -999.990 0.856 ..P WKT 2010 08 23 08 49 55 31.3200 -97.3300 251.000 30.0 107.691 3.360 -999.990 -999.990 1.077 ..P WKT 2010 08 23 08 54 55 31.3200 -97.3300 251.000 122.0 110.546 3.030 -999.990 -999.990 1.105 ..P WKT 2010 08 23 08 59 55 31.3200 -97.3300 251.000 457.0 85.905 2.450 -999.990 -999.990 0.859 ..P WKT 2010 08 23 09 09 55 31.3200 -97.3300 251.000 30.0 103.634 4.810 -999.990 -999.990 1.036 ..P WKT 2010 08 23 09 14 55 31.3200 -97.3300 251.000 122.0 102.717 3.350 -999.990 -999.990 1.027 ..P WKT 2010 08 23 09 19 55 31.3200 -97.3300 251.000 457.0 81.389 3.150 -999.990 -999.990 0.814 ..P WKT 2010 08 23 09 24 55 31.3200 -97.3300 251.000 30.0 103.742 4.060 -999.990 -999.990 1.037 ..P WKT 2010 08 23 09 29 55 31.3200 -97.3300 251.000 122.0 93.166 4.480 -999.990 -999.990 0.932 ..P WKT 2010 08 23 09 34 55 31.3200 -97.3300 251.000 457.0 83.816 5.090 -999.990 -999.990 0.838 ..P WKT 2010 08 23 09 44 55 31.3200 -97.3300 251.000 30.0 97.629 4.840 -999.990 -999.990 0.976 ..P WKT 2010 08 23 09 49 55 31.3200 -97.3300 251.000 122.0 96.714 4.100 -999.990 -999.990 0.967 ..P WKT 2010 08 23 09 54 55 31.3200 -97.3300 251.000 457.0 83.560 3.430 -999.990 -999.990 0.836 ..P WKT 2010 08 23 09 59 55 31.3200 -97.3300 251.000 30.0 100.595 3.690 -999.990 -999.990 1.006 ..P WKT 2010 08 23 10 04 55 31.3200 -97.3300 251.000 122.0 84.995 3.800 -999.990 -999.990 0.850 ..P WKT 2010 08 23 10 09 55 31.3200 -97.3300 251.000 457.0 77.011 3.360 -999.990 -999.990 0.770 ..P WKT 2010 08 23 10 19 55 31.3200 -97.3300 251.000 30.0 95.963 1.870 -999.990 -999.990 0.960 ..P WKT 2010 08 23 10 24 55 31.3200 -97.3300 251.000 122.0 94.893 3.180 -999.990 -999.990 0.949 ..P WKT 2010 08 23 10 29 55 31.3200 -97.3300 251.000 457.0 75.340 3.520 -999.990 -999.990 0.753 ..P WKT 2010 08 23 10 34 55 31.3200 -97.3300 251.000 30.0 97.374 2.530 -999.990 -999.990 0.974 ..P WKT 2010 08 23 10 39 55 31.3200 -97.3300 251.000 122.0 87.608 2.570 -999.990 -999.990 0.876 ..P WKT 2010 08 23 10 44 55 31.3200 -97.3300 251.000 457.0 77.843 3.060 -999.990 -999.990 0.778 ..P WKT 2010 08 23 10 54 55 31.3200 -97.3300 251.000 30.0 92.862 2.870 -999.990 -999.990 0.929 ..P WKT 2010 08 23 10 59 55 31.3200 -97.3300 251.000 122.0 95.092 3.220 -999.990 -999.990 0.951 ..P WKT 2010 08 23 11 04 55 31.3200 -97.3300 251.000 457.0 78.849 4.140 -999.990 -999.990 0.788 ..P WKT 2010 08 23 11 09 55 31.3200 -97.3300 251.000 30.0 90.858 3.250 -999.990 -999.990 0.909 ..P WKT 2010 08 23 11 14 55 31.3200 -97.3300 251.000 122.0 92.001 3.130 -999.990 -999.990 0.920 ..P WKT 2010 08 23 11 19 55 31.3200 -97.3300 251.000 457.0 82.009 4.180 -999.990 -999.990 0.820 ..P WKT 2010 08 23 11 29 55 31.3200 -97.3300 251.000 30.0 96.861 3.460 -999.990 -999.990 0.969 ..P WKT 2010 08 23 11 34 55 31.3200 -97.3300 251.000 122.0 99.979 4.560 -999.990 -999.990 1.000 ..P WKT 2010 08 23 11 39 55 31.3200 -97.3300 251.000 457.0 80.427 3.620 -999.990 -999.990 0.804 ..P WKT 2010 08 23 11 44 55 31.3200 -97.3300 251.000 30.0 104.720 3.780 -999.990 -999.990 1.047 ..P WKT 2010 08 23 11 49 55 31.3200 -97.3300 251.000 122.0 92.636 3.790 -999.990 -999.990 0.926 ..P WKT 2010 08 23 12 09 55 31.3200 -97.3300 251.000 457.0 82.935 2.520 -999.990 -999.990 0.829 ..P WKT 2010 08 23 12 10 25 31.3200 -97.3300 251.000 457.0 77.184 3.100 -999.990 -999.990 0.772 ..P WKT 2010 08 23 12 10 55 31.3200 -97.3300 251.000 457.0 80.392 3.110 -999.990 -999.990 0.804 ..P WKT 2010 08 23 12 11 25 31.3200 -97.3300 251.000 457.0 78.577 2.580 -999.990 -999.990 0.786 ..P WKT 2010 08 23 12 11 55 31.3200 -97.3300 251.000 457.0 72.962 3.350 -999.990 -999.990 0.730 ..P WKT 2010 08 23 12 12 25 31.3200 -97.3300 251.000 457.0 78.885 2.140 -999.990 -999.990 0.789 ..P WKT 2010 08 23 12 12 55 31.3200 -97.3300 251.000 457.0 77.614 2.470 -999.990 -999.990 0.776 ..P WKT 2010 08 23 12 13 25 31.3200 -97.3300 251.000 457.0 79.737 3.070 -999.990 -999.990 0.797 ..P WKT 2010 08 23 12 13 55 31.3200 -97.3300 251.000 457.0 85.524 2.840 -999.990 -999.990 0.855 ..P WKT 2010 08 23 12 14 25 31.3200 -97.3300 251.000 457.0 79.638 2.780 -999.990 -999.990 0.796 ..P WKT 2010 08 23 12 14 55 31.3200 -97.3300 251.000 457.0 84.476 4.060 -999.990 -999.990 0.845 ..P WKT 2010 08 23 12 19 55 31.3200 -97.3300 251.000 30.0 97.831 2.540 -999.990 -999.990 0.978 ..P WKT 2010 08 23 12 24 55 31.3200 -97.3300 251.000 122.0 96.794 2.670 -999.990 -999.990 0.968 ..P WKT 2010 08 23 12 29 55 31.3200 -97.3300 251.000 457.0 83.532 3.080 -999.990 -999.990 0.835 ..P WKT 2010 08 23 12 34 55 31.3200 -97.3300 251.000 30.0 96.487 2.770 -999.990 -999.990 0.965 ..P WKT 2010 08 23 12 39 55 31.3200 -97.3300 251.000 122.0 93.955 4.210 -999.990 -999.990 0.940 ..P WKT 2010 08 23 12 44 55 31.3200 -97.3300 251.000 457.0 79.869 3.220 -999.990 -999.990 0.799 ..P WKT 2010 08 23 12 54 55 31.3200 -97.3300 251.000 30.0 95.884 3.590 -999.990 -999.990 0.959 ..P WKT 2010 08 23 12 59 55 31.3200 -97.3300 251.000 122.0 87.108 3.160 -999.990 -999.990 0.871 ..P WKT 2010 08 23 13 04 55 31.3200 -97.3300 251.000 457.0 73.159 3.940 -999.990 -999.990 0.732 ..P WKT 2010 08 23 13 09 55 31.3200 -97.3300 251.000 30.0 96.209 5.120 -999.990 -999.990 0.962 ..P WKT 2010 08 23 13 14 55 31.3200 -97.3300 251.000 122.0 93.415 2.920 -999.990 -999.990 0.934 ..P WKT 2010 08 23 13 19 55 31.3200 -97.3300 251.000 457.0 77.962 2.940 -999.990 -999.990 0.780 ..P WKT 2010 08 23 13 29 55 31.3200 -97.3300 251.000 30.0 100.040 2.760 -999.990 -999.990 1.000 ..P WKT 2010 08 23 13 34 55 31.3200 -97.3300 251.000 122.0 92.790 3.720 -999.990 -999.990 0.928 ..P WKT 2010 08 23 13 39 55 31.3200 -97.3300 251.000 457.0 87.852 2.520 -999.990 -999.990 0.879 ..P WKT 2010 08 23 13 44 55 31.3200 -97.3300 251.000 30.0 100.757 5.210 -999.990 -999.990 1.008 ..P WKT 2010 08 23 13 49 55 31.3200 -97.3300 251.000 122.0 105.493 3.630 -999.990 -999.990 1.055 ..P WKT 2010 08 23 13 54 55 31.3200 -97.3300 251.000 457.0 79.977 2.990 -999.990 -999.990 0.800 ..P WKT 2010 08 23 14 04 55 31.3200 -97.3300 251.000 30.0 104.889 2.240 -999.990 -999.990 1.049 ..P WKT 2010 08 23 14 09 55 31.3200 -97.3300 251.000 122.0 102.986 2.650 -999.990 -999.990 1.030 ..P WKT 2010 08 23 14 14 55 31.3200 -97.3300 251.000 457.0 79.808 3.110 -999.990 -999.990 0.798 ..P WKT 2010 08 23 14 19 55 31.3200 -97.3300 251.000 30.0 103.272 3.320 -999.990 -999.990 1.033 ..P WKT 2010 08 23 14 24 55 31.3200 -97.3300 251.000 122.0 101.641 3.930 -999.990 -999.990 1.016 ..P WKT 2010 08 23 14 29 55 31.3200 -97.3300 251.000 457.0 84.998 3.030 -999.990 -999.990 0.850 ..P WKT 2010 08 23 14 39 55 31.3200 -97.3300 251.000 30.0 101.930 2.760 -999.990 -999.990 1.019 ..P WKT 2010 08 23 14 44 55 31.3200 -97.3300 251.000 122.0 101.663 3.160 -999.990 -999.990 1.017 ..P WKT 2010 08 23 14 49 55 31.3200 -97.3300 251.000 457.0 76.543 2.440 -999.990 -999.990 0.765 ..P WKT 2010 08 23 14 54 55 31.3200 -97.3300 251.000 30.0 100.582 3.000 -999.990 -999.990 1.006 ..P WKT 2010 08 23 14 59 55 31.3200 -97.3300 251.000 122.0 105.232 2.990 -999.990 -999.990 1.052 ..P WKT 2010 08 23 15 04 55 31.3200 -97.3300 251.000 457.0 82.011 2.280 -999.990 -999.990 0.820 ..P WKT 2010 08 23 15 14 55 31.3200 -97.3300 251.000 30.0 88.205 2.510 -999.990 -999.990 0.882 ..P WKT 2010 08 23 15 19 55 31.3200 -97.3300 251.000 122.0 99.867 2.810 -999.990 -999.990 0.999 ..P WKT 2010 08 23 15 24 55 31.3200 -97.3300 251.000 457.0 93.759 3.010 -999.990 -999.990 0.938 ..P WKT 2010 08 23 15 29 55 31.3200 -97.3300 251.000 30.0 94.486 3.130 -999.990 -999.990 0.945 ..P WKT 2010 08 23 15 34 55 31.3200 -97.3300 251.000 122.0 108.345 2.420 -999.990 -999.990 1.083 ..P WKT 2010 08 23 15 39 55 31.3200 -97.3300 251.000 457.0 85.544 3.610 -999.990 -999.990 0.855 ..P WKT 2010 08 23 15 49 55 31.3200 -97.3300 251.000 30.0 98.160 3.470 -999.990 -999.990 0.982 ..P WKT 2010 08 23 15 54 55 31.3200 -97.3300 251.000 122.0 104.853 2.830 -999.990 -999.990 1.049 ..P WKT 2010 08 23 15 59 55 31.3200 -97.3300 251.000 457.0 88.958 2.630 -999.990 -999.990 0.890 ..P WKT 2010 08 23 16 04 55 31.3200 -97.3300 251.000 30.0 84.560 4.400 -999.990 -999.990 0.846 ..P WKT 2010 08 23 16 09 55 31.3200 -97.3300 251.000 122.0 99.609 3.890 -999.990 -999.990 0.996 ..P WKT 2010 08 23 16 14 55 31.3200 -97.3300 251.000 457.0 90.280 2.480 -999.990 -999.990 0.903 ..P WKT 2010 08 23 16 24 55 31.3200 -97.3300 251.000 30.0 87.918 2.880 -999.990 -999.990 0.879 ..P WKT 2010 08 23 16 29 55 31.3200 -97.3300 251.000 122.0 98.319 3.480 -999.990 -999.990 0.983 ..P WKT 2010 08 23 16 34 55 31.3200 -97.3300 251.000 457.0 86.514 3.580 -999.990 -999.990 0.865 ..P WKT 2010 08 23 16 39 55 31.3200 -97.3300 251.000 30.0 87.320 3.430 -999.990 -999.990 0.873 ..P WKT 2010 08 23 16 44 55 31.3200 -97.3300 251.000 122.0 94.161 3.090 -999.990 -999.990 0.942 ..P WKT 2010 08 23 16 49 55 31.3200 -97.3300 251.000 457.0 85.093 3.410 -999.990 -999.990 0.851 ..P WKT 2010 08 23 17 04 55 31.3200 -97.3300 251.000 30.0 83.503 3.980 -999.990 -999.990 0.835 ..P WKT 2010 08 23 17 09 55 31.3200 -97.3300 251.000 122.0 88.824 3.310 -999.990 -999.990 0.888 ..P WKT 2010 08 23 17 14 55 31.3200 -97.3300 251.000 457.0 78.771 3.480 -999.990 -999.990 0.788 ..P WKT 2010 08 23 17 19 55 31.3200 -97.3300 251.000 30.0 82.034 3.610 -999.990 -999.990 0.820 ..P WKT 2010 08 23 17 24 55 31.3200 -97.3300 251.000 122.0 100.681 4.120 -999.990 -999.990 1.007 ..P WKT 2010 08 23 17 29 55 31.3200 -97.3300 251.000 457.0 84.168 3.580 -999.990 -999.990 0.842 ..P WKT 2010 08 23 17 39 55 31.3200 -97.3300 251.000 30.0 84.158 4.050 -999.990 -999.990 0.842 ..P WKT 2010 08 23 17 44 55 31.3200 -97.3300 251.000 122.0 102.736 4.370 -999.990 -999.990 1.027 ..P WKT 2010 08 23 17 49 55 31.3200 -97.3300 251.000 457.0 83.928 5.340 -999.990 -999.990 0.839 ..P WKT 2010 08 23 17 54 55 31.3200 -97.3300 251.000 30.0 90.687 4.240 -999.990 -999.990 0.907 ..P WKT 2010 08 23 17 59 55 31.3200 -97.3300 251.000 122.0 100.200 4.390 -999.990 -999.990 1.002 ..P WKT 2010 08 23 18 04 55 31.3200 -97.3300 251.000 457.0 89.083 4.580 -999.990 -999.990 0.891 ..P WKT 2010 08 23 18 14 55 31.3200 -97.3300 251.000 30.0 91.449 4.600 -999.990 -999.990 0.914 ..P WKT 2010 08 23 18 19 55 31.3200 -97.3300 251.000 122.0 100.812 4.680 -999.990 -999.990 1.008 ..P WKT 2010 08 23 18 24 55 31.3200 -97.3300 251.000 457.0 90.356 4.520 -999.990 -999.990 0.904 ..P WKT 2010 08 23 18 29 55 31.3200 -97.3300 251.000 30.0 81.273 4.280 -999.990 -999.990 0.813 ..P WKT 2010 08 23 18 34 55 31.3200 -97.3300 251.000 122.0 99.177 4.440 -999.990 -999.990 0.992 ..P WKT 2010 08 23 18 39 55 31.3200 -97.3300 251.000 457.0 89.816 4.150 -999.990 -999.990 0.898 ..P WKT 2010 08 23 18 49 55 31.3200 -97.3300 251.000 30.0 88.840 4.040 -999.990 -999.990 0.888 ..P WKT 2010 08 23 18 54 55 31.3200 -97.3300 251.000 122.0 104.672 4.230 -999.990 -999.990 1.047 ..P WKT 2010 08 23 18 59 55 31.3200 -97.3300 251.000 457.0 92.942 4.380 -999.990 -999.990 0.929 ..P WKT 2010 08 23 19 04 55 31.3200 -97.3300 251.000 30.0 90.583 3.860 -999.990 -999.990 0.906 ..P WKT 2010 08 23 19 09 55 31.3200 -97.3300 251.000 122.0 105.046 4.350 -999.990 -999.990 1.050 ..P WKT 2010 08 23 19 14 55 31.3200 -97.3300 251.000 457.0 93.034 4.680 -999.990 -999.990 0.930 ..P WKT 2010 08 23 19 24 55 31.3200 -97.3300 251.000 30.0 93.318 3.690 -999.990 -999.990 0.933 ..P WKT 2010 08 23 19 29 55 31.3200 -97.3300 251.000 122.0 106.727 3.750 -999.990 -999.990 1.067 ..P WKT 2010 08 23 19 34 55 31.3200 -97.3300 251.000 457.0 91.710 3.460 -999.990 -999.990 0.917 ..P WKT 2010 08 23 19 39 55 31.3200 -97.3300 251.000 30.0 89.801 3.600 -999.990 -999.990 0.898 ..P WKT 2010 08 23 19 44 55 31.3200 -97.3300 251.000 122.0 106.945 4.090 -999.990 -999.990 1.069 ..P WKT 2010 08 23 19 49 55 31.3200 -97.3300 251.000 457.0 89.848 3.130 -999.990 -999.990 0.898 ..P WKT 2010 08 23 19 59 55 31.3200 -97.3300 251.000 30.0 88.908 3.050 -999.990 -999.990 0.889 ..P WKT 2010 08 23 20 04 55 31.3200 -97.3300 251.000 122.0 107.289 3.050 -999.990 -999.990 1.073 ..P WKT 2010 08 23 20 09 55 31.3200 -97.3300 251.000 457.0 92.232 3.340 -999.990 -999.990 0.922 ..P WKT 2010 08 23 20 14 55 31.3200 -97.3300 251.000 30.0 92.651 3.730 -999.990 -999.990 0.927 ..P WKT 2010 08 23 20 19 55 31.3200 -97.3300 251.000 122.0 108.830 3.190 -999.990 -999.990 1.088 ..P WKT 2010 08 23 20 24 55 31.3200 -97.3300 251.000 457.0 99.435 4.220 -999.990 -999.990 0.994 ..P WKT 2010 08 23 20 34 55 31.3200 -97.3300 251.000 30.0 92.865 3.420 -999.990 -999.990 0.929 ..P WKT 2010 08 23 20 39 55 31.3200 -97.3300 251.000 122.0 111.053 3.370 -999.990 -999.990 1.111 ..P WKT 2010 08 23 20 44 55 31.3200 -97.3300 251.000 457.0 100.327 3.460 -999.990 -999.990 1.003 ..P WKT 2010 08 23 20 49 55 31.3200 -97.3300 251.000 30.0 98.592 3.760 -999.990 -999.990 0.986 ..P WKT 2010 08 23 20 54 55 31.3200 -97.3300 251.000 122.0 113.885 3.450 -999.990 -999.990 1.139 ..P WKT 2010 08 23 20 59 55 31.3200 -97.3300 251.000 457.0 104.952 3.360 -999.990 -999.990 1.050 ..P WKT 2010 08 23 21 09 55 31.3200 -97.3300 251.000 30.0 97.485 3.890 -999.990 -999.990 0.975 ..P WKT 2010 08 23 21 14 55 31.3200 -97.3300 251.000 122.0 115.442 4.070 -999.990 -999.990 1.154 ..P WKT 2010 08 23 21 19 55 31.3200 -97.3300 251.000 457.0 106.384 3.620 -999.990 -999.990 1.064 ..P WKT 2010 08 23 21 24 55 31.3200 -97.3300 251.000 30.0 98.016 3.580 -999.990 -999.990 0.980 ..P WKT 2010 08 23 21 29 55 31.3200 -97.3300 251.000 122.0 115.012 3.810 -999.990 -999.990 1.150 ..P WKT 2010 08 23 21 34 55 31.3200 -97.3300 251.000 457.0 100.680 3.340 -999.990 -999.990 1.007 ..P WKT 2010 08 23 21 44 55 31.3200 -97.3300 251.000 30.0 98.829 5.350 -999.990 -999.990 0.988 ..P WKT 2010 08 23 21 49 55 31.3200 -97.3300 251.000 122.0 110.765 3.610 -999.990 -999.990 1.108 ..P WKT 2010 08 23 21 54 55 31.3200 -97.3300 251.000 457.0 102.725 4.040 -999.990 -999.990 1.027 ..P WKT 2010 08 23 21 59 55 31.3200 -97.3300 251.000 30.0 98.568 3.550 -999.990 -999.990 0.986 ..P WKT 2010 08 23 22 04 55 31.3200 -97.3300 251.000 122.0 110.233 3.880 -999.990 -999.990 1.102 ..P WKT 2010 08 23 22 09 55 31.3200 -97.3300 251.000 457.0 96.080 4.080 -999.990 -999.990 0.961 ..P WKT 2010 08 23 22 19 55 31.3200 -97.3300 251.000 30.0 96.566 4.390 -999.990 -999.990 0.966 ..P WKT 2010 08 23 22 24 55 31.3200 -97.3300 251.000 122.0 109.270 3.830 -999.990 -999.990 1.093 ..P WKT 2010 08 23 22 29 55 31.3200 -97.3300 251.000 457.0 103.364 4.160 -999.990 -999.990 1.034 ..P WKT 2010 08 23 22 34 55 31.3200 -97.3300 251.000 30.0 101.623 4.700 -999.990 -999.990 1.016 ..P WKT 2010 08 23 22 39 55 31.3200 -97.3300 251.000 122.0 116.004 4.450 -999.990 -999.990 1.160 ..P WKT 2010 08 23 22 44 55 31.3200 -97.3300 251.000 457.0 110.094 4.890 -999.990 -999.990 1.101 ..P WKT 2010 08 23 22 54 55 31.3200 -97.3300 251.000 30.0 102.282 3.640 -999.990 -999.990 1.023 ..P WKT 2010 08 23 22 59 55 31.3200 -97.3300 251.000 122.0 117.350 4.040 -999.990 -999.990 1.173 ..P WKT 2010 08 23 23 04 55 31.3200 -97.3300 251.000 457.0 108.773 4.310 -999.990 -999.990 1.088 ..P WKT 2010 08 23 23 09 55 31.3200 -97.3300 251.000 30.0 101.585 3.850 -999.990 -999.990 1.016 ..P WKT 2010 08 23 23 14 55 31.3200 -97.3300 251.000 122.0 115.548 3.610 -999.990 -999.990 1.155 ..P WKT 2010 08 23 23 19 55 31.3200 -97.3300 251.000 457.0 107.244 4.000 -999.990 -999.990 1.072 ..P WKT 2010 08 23 23 29 55 31.3200 -97.3300 251.000 30.0 96.576 4.930 -999.990 -999.990 0.966 ..P WKT 2010 08 23 23 34 55 31.3200 -97.3300 251.000 122.0 118.029 4.160 -999.990 -999.990 1.180 ..P WKT 2010 08 23 23 39 55 31.3200 -97.3300 251.000 457.0 107.870 3.840 -999.990 -999.990 1.079 ..P WKT 2010 08 23 23 44 55 31.3200 -97.3300 251.000 30.0 101.885 4.200 -999.990 -999.990 1.019 ..P WKT 2010 08 23 23 49 55 31.3200 -97.3300 251.000 122.0 113.179 4.470 -999.990 -999.990 1.132 ..P WKT 2010 08 24 00 09 55 31.3200 -97.3300 251.000 457.0 105.515 4.660 -999.990 -999.990 1.055 ..P WKT 2010 08 24 00 10 25 31.3200 -97.3300 251.000 457.0 105.011 4.490 -999.990 -999.990 1.050 ..P WKT 2010 08 24 00 10 55 31.3200 -97.3300 251.000 457.0 106.877 4.400 -999.990 -999.990 1.069 ..P WKT 2010 08 24 00 11 25 31.3200 -97.3300 251.000 457.0 107.071 4.970 -999.990 -999.990 1.071 ..P WKT 2010 08 24 00 11 55 31.3200 -97.3300 251.000 457.0 102.943 5.550 -999.990 -999.990 1.029 ..P WKT 2010 08 24 00 12 25 31.3200 -97.3300 251.000 457.0 104.391 4.590 -999.990 -999.990 1.044 ..P WKT 2010 08 24 00 12 55 31.3200 -97.3300 251.000 457.0 102.354 4.470 -999.990 -999.990 1.024 ..P WKT 2010 08 24 00 13 25 31.3200 -97.3300 251.000 457.0 104.360 5.060 -999.990 -999.990 1.044 ..P WKT 2010 08 24 00 13 55 31.3200 -97.3300 251.000 457.0 102.323 5.060 -999.990 -999.990 1.023 ..P WKT 2010 08 24 00 14 25 31.3200 -97.3300 251.000 457.0 101.401 5.800 -999.990 -999.990 1.014 ..P WKT 2010 08 24 00 14 55 31.3200 -97.3300 251.000 457.0 96.577 4.820 -999.990 -999.990 0.966 ..P WKT 2010 08 24 00 19 55 31.3200 -97.3300 251.000 30.0 98.930 4.250 -999.990 -999.990 0.989 ..P WKT 2010 08 24 00 24 55 31.3200 -97.3300 251.000 122.0 115.219 7.300 -999.990 -999.990 1.152 ..P WKT 2010 08 24 00 29 55 31.3200 -97.3300 251.000 457.0 97.780 7.310 -999.990 -999.990 0.978 ..P WKT 2010 08 24 00 34 55 31.3200 -97.3300 251.000 30.0 95.394 6.170 -999.990 -999.990 0.954 ..P WKT 2010 08 24 00 39 55 31.3200 -97.3300 251.000 122.0 104.993 5.560 -999.990 -999.990 1.050 ..P WKT 2010 08 24 00 44 55 31.3200 -97.3300 251.000 457.0 98.286 4.110 -999.990 -999.990 0.983 ..P WKT 2010 08 24 00 54 55 31.3200 -97.3300 251.000 30.0 100.139 4.910 -999.990 -999.990 1.001 ..P WKT 2010 08 24 00 59 55 31.3200 -97.3300 251.000 122.0 109.115 6.710 -999.990 -999.990 1.091 ..P WKT 2010 08 24 01 04 55 31.3200 -97.3300 251.000 457.0 100.116 6.880 -999.990 -999.990 1.001 ..P WKT 2010 08 24 01 09 55 31.3200 -97.3300 251.000 30.0 143.085 6.960 -999.990 -999.990 1.431 ..P WKT 2010 08 24 01 14 55 31.3200 -97.3300 251.000 122.0 112.352 6.080 -999.990 -999.990 1.124 ..P WKT 2010 08 24 01 19 55 31.3200 -97.3300 251.000 457.0 108.648 5.250 -999.990 -999.990 1.086 ..P WKT 2010 08 24 01 29 55 31.3200 -97.3300 251.000 30.0 112.047 4.690 -999.990 -999.990 1.120 ..P WKT 2010 08 24 01 34 55 31.3200 -97.3300 251.000 122.0 117.618 5.970 -999.990 -999.990 1.176 ..P WKT 2010 08 24 01 39 55 31.3200 -97.3300 251.000 457.0 103.965 6.800 -999.990 -999.990 1.040 ..P WKT 2010 08 24 01 44 55 31.3200 -97.3300 251.000 30.0 105.913 5.700 -999.990 -999.990 1.059 ..P WKT 2010 08 24 01 49 55 31.3200 -97.3300 251.000 122.0 107.861 4.270 -999.990 -999.990 1.079 ..P WKT 2010 08 24 01 54 55 31.3200 -97.3300 251.000 457.0 101.731 3.870 -999.990 -999.990 1.017 ..P WKT 2010 08 24 02 04 55 31.3200 -97.3300 251.000 30.0 95.362 3.630 -999.990 -999.990 0.954 ..P WKT 2010 08 24 02 09 55 31.3200 -97.3300 251.000 122.0 106.819 3.740 -999.990 -999.990 1.068 ..P WKT 2010 08 24 02 14 55 31.3200 -97.3300 251.000 457.0 98.502 4.960 -999.990 -999.990 0.985 ..P WKT 2010 08 24 02 19 55 31.3200 -97.3300 251.000 30.0 99.932 3.690 -999.990 -999.990 0.999 ..P WKT 2010 08 24 02 24 55 31.3200 -97.3300 251.000 122.0 108.046 3.580 -999.990 -999.990 1.080 ..P WKT 2010 08 24 02 29 55 31.3200 -97.3300 251.000 457.0 98.895 4.950 -999.990 -999.990 0.989 ..P WKT 2010 08 24 02 39 55 31.3200 -97.3300 251.000 30.0 99.807 3.720 -999.990 -999.990 0.998 ..P WKT 2010 08 24 02 44 55 31.3200 -97.3300 251.000 122.0 106.527 3.660 -999.990 -999.990 1.065 ..P WKT 2010 08 24 02 49 55 31.3200 -97.3300 251.000 457.0 103.780 3.830 -999.990 -999.990 1.038 ..P WKT 2010 08 24 02 54 55 31.3200 -97.3300 251.000 30.0 101.870 3.600 -999.990 -999.990 1.019 ..P WKT 2010 08 24 02 59 55 31.3200 -97.3300 251.000 122.0 106.084 4.720 -999.990 -999.990 1.061 ..P WKT 2010 08 24 03 04 55 31.3200 -97.3300 251.000 457.0 105.008 3.600 -999.990 -999.990 1.050 ..P WKT 2010 08 24 03 14 55 31.3200 -97.3300 251.000 30.0 116.596 3.690 -999.990 -999.990 1.166 ..P WKT 2010 08 24 03 19 55 31.3200 -97.3300 251.000 122.0 112.558 3.700 -999.990 -999.990 1.126 ..P WKT 2010 08 24 03 24 55 31.3200 -97.3300 251.000 457.0 118.262 5.000 -999.990 -999.990 1.183 ..P WKT 2010 08 24 03 29 55 31.3200 -97.3300 251.000 30.0 115.198 4.060 -999.990 -999.990 1.152 ..P WKT 2010 08 24 03 34 55 31.3200 -97.3300 251.000 122.0 121.736 4.870 -999.990 -999.990 1.217 ..P WKT 2010 08 24 03 39 55 31.3200 -97.3300 251.000 457.0 108.931 4.550 -999.990 -999.990 1.089 ..P WKT 2010 08 24 03 49 55 31.3200 -97.3300 251.000 30.0 105.747 4.560 -999.990 -999.990 1.057 ..P WKT 2010 08 24 03 54 55 31.3200 -97.3300 251.000 122.0 120.096 5.380 -999.990 -999.990 1.201 ..P WKT 2010 08 24 03 59 55 31.3200 -97.3300 251.000 457.0 108.844 4.830 -999.990 -999.990 1.088 ..P WKT 2010 08 24 04 04 55 31.3200 -97.3300 251.000 30.0 103.437 4.690 -999.990 -999.990 1.034 ..P WKT 2010 08 24 04 09 55 31.3200 -97.3300 251.000 122.0 113.053 5.180 -999.990 -999.990 1.131 ..P WKT 2010 08 24 04 14 55 31.3200 -97.3300 251.000 457.0 102.777 4.670 -999.990 -999.990 1.028 ..P WKT 2010 08 24 04 24 55 31.3200 -97.3300 251.000 30.0 100.468 4.460 -999.990 -999.990 1.005 ..P WKT 2010 08 24 04 29 55 31.3200 -97.3300 251.000 122.0 109.547 4.580 -999.990 -999.990 1.095 ..P WKT 2010 08 24 04 34 55 31.3200 -97.3300 251.000 457.0 98.041 4.830 -999.990 -999.990 0.980 ..P WKT 2010 08 24 04 39 55 31.3200 -97.3300 251.000 30.0 105.312 4.010 -999.990 -999.990 1.053 ..P WKT 2010 08 24 04 44 55 31.3200 -97.3300 251.000 122.0 107.714 4.970 -999.990 -999.990 1.077 ..P WKT 2010 08 24 04 49 55 31.3200 -97.3300 251.000 457.0 95.095 4.310 -999.990 -999.990 0.951 ..P WKT 2010 08 24 05 04 55 31.3200 -97.3300 251.000 30.0 103.856 3.660 -999.990 -999.990 1.039 ..P WKT 2010 08 24 05 09 55 31.3200 -97.3300 251.000 122.0 107.731 3.590 -999.990 -999.990 1.077 ..P WKT 2010 08 24 05 14 55 31.3200 -97.3300 251.000 457.0 92.000 3.570 -999.990 -999.990 0.920 ..P WKT 2010 08 24 05 19 55 31.3200 -97.3300 251.000 30.0 107.553 3.670 -999.990 -999.990 1.076 ..P WKT 2010 08 24 05 24 55 31.3200 -97.3300 251.000 122.0 112.401 3.590 -999.990 -999.990 1.124 ..P WKT 2010 08 24 05 29 55 31.3200 -97.3300 251.000 457.0 92.082 3.640 -999.990 -999.990 0.921 ..P WKT 2010 08 24 05 39 55 31.3200 -97.3300 251.000 30.0 113.531 4.580 -999.990 -999.990 1.135 ..P WKT 2010 08 24 05 44 55 31.3200 -97.3300 251.000 122.0 114.005 3.410 -999.990 -999.990 1.140 ..P WKT 2010 08 24 05 49 55 31.3200 -97.3300 251.000 457.0 94.463 3.780 -999.990 -999.990 0.945 ..P WKT 2010 08 24 05 54 55 31.3200 -97.3300 251.000 30.0 111.340 3.640 -999.990 -999.990 1.113 ..P WKT 2010 08 24 05 59 55 31.3200 -97.3300 251.000 122.0 104.309 3.530 -999.990 -999.990 1.043 ..P WKT 2010 08 24 06 04 55 31.3200 -97.3300 251.000 457.0 90.328 3.430 -999.990 -999.990 0.903 ..P WKT 2010 08 24 06 14 55 31.3200 -97.3300 251.000 30.0 105.495 3.500 -999.990 -999.990 1.055 ..P WKT 2010 08 24 06 19 55 31.3200 -97.3300 251.000 122.0 99.339 3.740 -999.990 -999.990 0.993 ..P WKT 2010 08 24 06 24 55 31.3200 -97.3300 251.000 457.0 85.122 3.390 -999.990 -999.990 0.851 ..P WKT 2010 08 24 06 29 55 31.3200 -97.3300 251.000 30.0 106.482 3.380 -999.990 -999.990 1.065 ..P WKT 2010 08 24 06 34 55 31.3200 -97.3300 251.000 122.0 100.604 3.550 -999.990 -999.990 1.006 ..P WKT 2010 08 24 06 39 55 31.3200 -97.3300 251.000 457.0 86.667 3.380 -999.990 -999.990 0.867 ..P WKT 2010 08 24 06 49 55 31.3200 -97.3300 251.000 30.0 92.024 3.520 -999.990 -999.990 0.920 ..P WKT 2010 08 24 06 54 55 31.3200 -97.3300 251.000 122.0 106.870 3.400 -999.990 -999.990 1.069 ..P WKT 2010 08 24 06 59 55 31.3200 -97.3300 251.000 457.0 88.648 3.400 -999.990 -999.990 0.886 ..P WKT 2010 08 24 07 04 55 31.3200 -97.3300 251.000 30.0 91.822 4.020 -999.990 -999.990 0.918 ..P WKT 2010 08 24 07 09 55 31.3200 -97.3300 251.000 122.0 103.887 4.410 -999.990 -999.990 1.039 ..P WKT 2010 08 24 07 14 55 31.3200 -97.3300 251.000 457.0 89.279 3.440 -999.990 -999.990 0.893 ..P WKT 2010 08 24 07 24 55 31.3200 -97.3300 251.000 30.0 97.175 4.180 -999.990 -999.990 0.972 ..P WKT 2010 08 24 07 29 55 31.3200 -97.3300 251.000 122.0 100.646 3.990 -999.990 -999.990 1.006 ..P WKT 2010 08 24 07 34 55 31.3200 -97.3300 251.000 457.0 84.255 4.010 -999.990 -999.990 0.843 ..P WKT 2010 08 24 07 39 55 31.3200 -97.3300 251.000 30.0 89.532 4.320 -999.990 -999.990 0.895 ..P WKT 2010 08 24 07 44 55 31.3200 -97.3300 251.000 122.0 99.808 4.350 -999.990 -999.990 0.998 ..P WKT 2010 08 24 07 49 55 31.3200 -97.3300 251.000 457.0 82.308 4.400 -999.990 -999.990 0.823 ..P WKT 2010 08 24 07 59 55 31.3200 -97.3300 251.000 30.0 98.375 4.360 -999.990 -999.990 0.984 ..P WKT 2010 08 24 08 04 55 31.3200 -97.3300 251.000 122.0 106.109 4.000 -999.990 -999.990 1.061 ..P WKT 2010 08 24 08 09 55 31.3200 -97.3300 251.000 457.0 88.711 4.850 -999.990 -999.990 0.887 ..P WKT 2010 08 24 08 14 55 31.3200 -97.3300 251.000 30.0 102.693 5.000 -999.990 -999.990 1.027 ..P WKT 2010 08 24 08 19 55 31.3200 -97.3300 251.000 122.0 101.542 4.450 -999.990 -999.990 1.015 ..P WKT 2010 08 24 08 24 55 31.3200 -97.3300 251.000 457.0 89.838 4.100 -999.990 -999.990 0.898 ..P WKT 2010 08 24 08 34 55 31.3200 -97.3300 251.000 30.0 100.287 4.030 -999.990 -999.990 1.003 ..P WKT 2010 08 24 08 39 55 31.3200 -97.3300 251.000 122.0 112.442 3.920 -999.990 -999.990 1.124 ..P WKT 2010 08 24 08 44 55 31.3200 -97.3300 251.000 457.0 90.864 4.630 -999.990 -999.990 0.909 ..P WKT 2010 08 24 08 49 55 31.3200 -97.3300 251.000 30.0 105.795 4.730 -999.990 -999.990 1.058 ..P WKT 2010 08 24 08 54 55 31.3200 -97.3300 251.000 122.0 110.452 4.330 -999.990 -999.990 1.105 ..P WKT 2010 08 24 08 59 55 31.3200 -97.3300 251.000 457.0 93.319 3.720 -999.990 -999.990 0.933 ..P WKT 2010 08 24 09 09 55 31.3200 -97.3300 251.000 30.0 101.009 3.760 -999.990 -999.990 1.010 ..P WKT 2010 08 24 09 14 55 31.3200 -97.3300 251.000 122.0 109.731 4.130 -999.990 -999.990 1.097 ..P WKT 2010 08 24 09 19 55 31.3200 -97.3300 251.000 457.0 91.113 4.810 -999.990 -999.990 0.911 ..P WKT 2010 08 24 09 24 55 31.3200 -97.3300 251.000 30.0 101.084 4.670 -999.990 -999.990 1.011 ..P WKT 2010 08 24 09 29 55 31.3200 -97.3300 251.000 122.0 105.779 4.380 -999.990 -999.990 1.058 ..P WKT 2010 08 24 09 34 55 31.3200 -97.3300 251.000 457.0 88.830 3.520 -999.990 -999.990 0.888 ..P WKT 2010 08 24 09 44 55 31.3200 -97.3300 251.000 30.0 110.214 3.720 -999.990 -999.990 1.102 ..P WKT 2010 08 24 09 49 55 31.3200 -97.3300 251.000 122.0 107.754 4.620 -999.990 -999.990 1.078 ..P WKT 2010 08 24 09 54 55 31.3200 -97.3300 251.000 457.0 88.924 4.820 -999.990 -999.990 0.889 ..P WKT 2010 08 24 09 59 55 31.3200 -97.3300 251.000 30.0 97.009 5.790 -999.990 -999.990 0.970 ..P WKT 2010 08 24 10 04 55 31.3200 -97.3300 251.000 122.0 106.203 4.350 -999.990 -999.990 1.062 ..P WKT 2010 08 24 10 09 55 31.3200 -97.3300 251.000 457.0 84.323 4.150 -999.990 -999.990 0.843 ..P WKT 2010 08 24 10 19 55 31.3200 -97.3300 251.000 30.0 101.482 3.960 -999.990 -999.990 1.015 ..P WKT 2010 08 24 10 24 55 31.3200 -97.3300 251.000 122.0 112.219 4.380 -999.990 -999.990 1.122 ..P WKT 2010 08 24 10 29 55 31.3200 -97.3300 251.000 457.0 89.114 5.630 -999.990 -999.990 0.891 ..P WKT 2010 08 24 10 34 55 31.3200 -97.3300 251.000 30.0 107.341 4.470 -999.990 -999.990 1.073 ..P WKT 2010 08 24 10 39 55 31.3200 -97.3300 251.000 122.0 116.413 4.030 -999.990 -999.990 1.164 ..P WKT 2010 08 24 10 44 55 31.3200 -97.3300 251.000 457.0 83.881 3.650 -999.990 -999.990 0.839 ..P WKT 2010 08 24 10 54 55 31.3200 -97.3300 251.000 30.0 93.228 3.670 -999.990 -999.990 0.932 ..P WKT 2010 08 24 10 59 55 31.3200 -97.3300 251.000 122.0 103.488 3.410 -999.990 -999.990 1.035 ..P WKT 2010 08 24 11 04 55 31.3200 -97.3300 251.000 457.0 86.848 3.680 -999.990 -999.990 0.868 ..P WKT 2010 08 24 11 09 55 31.3200 -97.3300 251.000 30.0 96.552 4.180 -999.990 -999.990 0.966 ..P WKT 2010 08 24 11 14 55 31.3200 -97.3300 251.000 122.0 99.324 4.730 -999.990 -999.990 0.993 ..P WKT 2010 08 24 11 19 55 31.3200 -97.3300 251.000 457.0 96.827 3.560 -999.990 -999.990 0.968 ..P WKT 2010 08 24 11 29 55 31.3200 -97.3300 251.000 30.0 104.379 3.640 -999.990 -999.990 1.044 ..P WKT 2010 08 24 11 34 55 31.3200 -97.3300 251.000 122.0 101.951 3.840 -999.990 -999.990 1.020 ..P WKT 2010 08 24 11 39 55 31.3200 -97.3300 251.000 457.0 87.880 3.760 -999.990 -999.990 0.879 ..P WKT 2010 08 24 11 44 55 31.3200 -97.3300 251.000 30.0 109.017 4.340 -999.990 -999.990 1.090 ..P WKT 2010 08 24 11 49 55 31.3200 -97.3300 251.000 122.0 100.629 4.010 -999.990 -999.990 1.006 ..P WKT 2010 08 24 12 09 55 31.3200 -97.3300 251.000 457.0 94.603 4.550 -999.990 -999.990 0.946 ..P WKT 2010 08 24 12 10 25 31.3200 -97.3300 251.000 457.0 90.056 4.340 -999.990 -999.990 0.901 ..P WKT 2010 08 24 12 10 55 31.3200 -97.3300 251.000 457.0 94.105 3.980 -999.990 -999.990 0.941 ..P WKT 2010 08 24 12 11 25 31.3200 -97.3300 251.000 457.0 93.440 4.140 -999.990 -999.990 0.934 ..P WKT 2010 08 24 12 11 55 31.3200 -97.3300 251.000 457.0 93.191 4.810 -999.990 -999.990 0.932 ..P WKT 2010 08 24 12 12 25 31.3200 -97.3300 251.000 457.0 86.702 3.980 -999.990 -999.990 0.867 ..P WKT 2010 08 24 12 12 55 31.3200 -97.3300 251.000 457.0 90.336 3.950 -999.990 -999.990 0.903 ..P WKT 2010 08 24 12 13 25 31.3200 -97.3300 251.000 457.0 91.196 3.850 -999.990 -999.990 0.912 ..P WKT 2010 08 24 12 13 55 31.3200 -97.3300 251.000 457.0 89.282 3.890 -999.990 -999.990 0.893 ..P WKT 2010 08 24 12 14 25 31.3200 -97.3300 251.000 457.0 94.581 5.510 -999.990 -999.990 0.946 ..P WKT 2010 08 24 12 14 55 31.3200 -97.3300 251.000 457.0 94.331 5.230 -999.990 -999.990 0.943 ..P WKT 2010 08 24 12 19 55 31.3200 -97.3300 251.000 30.0 119.302 3.910 -999.990 -999.990 1.193 ..P WKT 2010 08 24 12 24 55 31.3200 -97.3300 251.000 122.0 106.411 4.430 -999.990 -999.990 1.064 ..P WKT 2010 08 24 12 29 55 31.3200 -97.3300 251.000 457.0 84.496 4.910 -999.990 -999.990 0.845 ..P WKT 2010 08 24 12 34 55 31.3200 -97.3300 251.000 30.0 117.667 5.350 -999.990 -999.990 1.177 ..P WKT 2010 08 24 12 39 55 31.3200 -97.3300 251.000 122.0 106.988 4.720 -999.990 -999.990 1.070 ..P WKT 2010 08 24 12 44 55 31.3200 -97.3300 251.000 457.0 90.337 4.420 -999.990 -999.990 0.903 ..P WKT 2010 08 24 12 54 55 31.3200 -97.3300 251.000 30.0 126.653 4.000 -999.990 -999.990 1.267 ..P WKT 2010 08 24 12 59 55 31.3200 -97.3300 251.000 122.0 104.221 4.310 -999.990 -999.990 1.042 ..P WKT 2010 08 24 13 04 55 31.3200 -97.3300 251.000 457.0 85.811 5.240 -999.990 -999.990 0.858 ..P WKT 2010 08 24 13 09 55 31.3200 -97.3300 251.000 30.0 134.508 6.460 -999.990 -999.990 1.345 ..P WKT 2010 08 24 13 14 55 31.3200 -97.3300 251.000 122.0 97.751 5.620 -999.990 -999.990 0.978 ..P WKT 2010 08 24 13 19 55 31.3200 -97.3300 251.000 457.0 73.352 4.200 -999.990 -999.990 0.734 ..P WKT 2010 08 24 13 29 55 31.3200 -97.3300 251.000 30.0 129.851 4.280 -999.990 -999.990 1.299 ..P WKT 2010 08 24 13 34 55 31.3200 -97.3300 251.000 122.0 106.338 5.530 -999.990 -999.990 1.063 ..P WKT 2010 08 24 13 39 55 31.3200 -97.3300 251.000 457.0 86.712 6.100 -999.990 -999.990 0.867 ..P WKT 2010 08 24 13 44 55 31.3200 -97.3300 251.000 30.0 122.731 6.940 -999.990 -999.990 1.227 ..P WKT 2010 08 24 13 49 55 31.3200 -97.3300 251.000 122.0 105.606 5.990 -999.990 -999.990 1.056 ..P WKT 2010 08 24 13 54 55 31.3200 -97.3300 251.000 457.0 85.411 4.520 -999.990 -999.990 0.854 ..P WKT 2010 08 24 14 04 55 31.3200 -97.3300 251.000 30.0 123.171 4.780 -999.990 -999.990 1.232 ..P WKT 2010 08 24 14 09 55 31.3200 -97.3300 251.000 122.0 115.702 6.080 -999.990 -999.990 1.157 ..P WKT 2010 08 24 14 14 55 31.3200 -97.3300 251.000 457.0 83.436 7.350 -999.990 -999.990 0.834 ..P WKT 2010 08 24 14 19 55 31.3200 -97.3300 251.000 30.0 118.586 6.590 -999.990 -999.990 1.186 ..P WKT 2010 08 24 14 24 55 31.3200 -97.3300 251.000 122.0 117.800 6.050 -999.990 -999.990 1.178 ..P WKT 2010 08 24 14 29 55 31.3200 -97.3300 251.000 457.0 82.729 4.680 -999.990 -999.990 0.827 ..P WKT 2010 08 24 14 39 55 31.3200 -97.3300 251.000 30.0 109.743 4.440 -999.990 -999.990 1.097 ..P WKT 2010 08 24 14 44 55 31.3200 -97.3300 251.000 122.0 111.065 6.190 -999.990 -999.990 1.111 ..P WKT 2010 08 24 14 49 55 31.3200 -97.3300 251.000 457.0 84.774 7.600 -999.990 -999.990 0.848 ..P WKT 2010 08 24 14 54 55 31.3200 -97.3300 251.000 30.0 108.691 5.820 -999.990 -999.990 1.087 ..P WKT 2010 08 24 14 59 55 31.3200 -97.3300 251.000 122.0 123.130 4.770 -999.990 -999.990 1.231 ..P WKT 2010 08 24 15 04 55 31.3200 -97.3300 251.000 457.0 90.128 3.980 -999.990 -999.990 0.901 ..P WKT 2010 08 24 15 14 55 31.3200 -97.3300 251.000 30.0 98.134 4.190 -999.990 -999.990 0.981 ..P WKT 2010 08 24 15 19 55 31.3200 -97.3300 251.000 122.0 116.970 4.900 -999.990 -999.990 1.170 ..P WKT 2010 08 24 15 24 55 31.3200 -97.3300 251.000 457.0 84.841 5.650 -999.990 -999.990 0.848 ..P WKT 2010 08 24 15 29 55 31.3200 -97.3300 251.000 30.0 107.731 5.550 -999.990 -999.990 1.077 ..P WKT 2010 08 24 15 34 55 31.3200 -97.3300 251.000 122.0 111.770 4.300 -999.990 -999.990 1.118 ..P WKT 2010 08 24 15 39 55 31.3200 -97.3300 251.000 457.0 96.389 4.490 -999.990 -999.990 0.964 ..P WKT 2010 08 24 15 49 55 31.3200 -97.3300 251.000 30.0 100.275 4.560 -999.990 -999.990 1.003 ..P WKT 2010 08 24 15 54 55 31.3200 -97.3300 251.000 122.0 114.521 5.070 -999.990 -999.990 1.145 ..P WKT 2010 08 24 15 59 55 31.3200 -97.3300 251.000 457.0 104.582 5.080 -999.990 -999.990 1.046 ..P WKT 2010 08 24 16 04 55 31.3200 -97.3300 251.000 30.0 106.247 5.450 -999.990 -999.990 1.062 ..P WKT 2010 08 24 16 09 55 31.3200 -97.3300 251.000 122.0 113.929 5.400 -999.990 -999.990 1.139 ..P WKT 2010 08 24 16 14 55 31.3200 -97.3300 251.000 457.0 102.585 5.590 -999.990 -999.990 1.026 ..P WKT 2010 08 24 16 24 55 31.3200 -97.3300 251.000 30.0 110.336 5.330 -999.990 -999.990 1.103 ..P WKT 2010 08 24 16 29 55 31.3200 -97.3300 251.000 122.0 119.364 5.850 -999.990 -999.990 1.194 ..P WKT 2010 08 24 16 34 55 31.3200 -97.3300 251.000 457.0 104.733 6.860 -999.990 -999.990 1.047 ..P WKT 2010 08 24 16 39 55 31.3200 -97.3300 251.000 30.0 120.905 8.170 -999.990 -999.990 1.209 ..P WKT 2010 08 24 16 44 55 31.3200 -97.3300 251.000 122.0 126.997 7.310 -999.990 -999.990 1.270 ..P WKT 2010 08 24 16 49 55 31.3200 -97.3300 251.000 457.0 110.679 5.250 -999.990 -999.990 1.107 ..P WKT 2010 08 24 17 04 55 31.3200 -97.3300 251.000 30.0 118.053 6.800 -999.990 -999.990 1.181 ..P WKT 2010 08 24 17 09 55 31.3200 -97.3300 251.000 122.0 120.235 8.140 -999.990 -999.990 1.202 ..P WKT 2010 08 24 17 14 55 31.3200 -97.3300 251.000 457.0 115.128 8.300 -999.990 -999.990 1.151 ..P WKT 2010 08 24 17 19 55 31.3200 -97.3300 251.000 30.0 106.091 7.290 -999.990 -999.990 1.061 ..P WKT 2010 08 24 17 24 55 31.3200 -97.3300 251.000 122.0 117.531 6.280 -999.990 -999.990 1.175 ..P WKT 2010 08 24 17 29 55 31.3200 -97.3300 251.000 457.0 103.441 4.910 -999.990 -999.990 1.034 ..P WKT 2010 08 24 17 39 55 31.3200 -97.3300 251.000 30.0 101.500 5.490 -999.990 -999.990 1.015 ..P WKT 2010 08 24 17 44 55 31.3200 -97.3300 251.000 122.0 123.766 7.150 -999.990 -999.990 1.238 ..P WKT 2010 08 24 17 49 55 31.3200 -97.3300 251.000 457.0 106.167 7.620 -999.990 -999.990 1.062 ..P WKT 2010 08 24 17 54 55 31.3200 -97.3300 251.000 30.0 107.659 6.950 -999.990 -999.990 1.077 ..P WKT 2010 08 24 17 59 55 31.3200 -97.3300 251.000 122.0 117.860 5.120 -999.990 -999.990 1.179 ..P WKT 2010 08 24 18 04 55 31.3200 -97.3300 251.000 457.0 115.140 4.970 -999.990 -999.990 1.151 ..P WKT 2010 08 24 18 14 55 31.3200 -97.3300 251.000 30.0 122.186 5.010 -999.990 -999.990 1.222 ..P WKT 2010 08 24 18 19 55 31.3200 -97.3300 251.000 122.0 130.269 5.100 -999.990 -999.990 1.303 ..P WKT 2010 08 24 18 24 55 31.3200 -97.3300 251.000 457.0 129.498 5.770 -999.990 -999.990 1.295 ..P WKT 2010 08 24 18 29 55 31.3200 -97.3300 251.000 30.0 131.539 5.420 -999.990 -999.990 1.315 ..P WKT 2010 08 24 18 34 55 31.3200 -97.3300 251.000 122.0 134.142 5.220 -999.990 -999.990 1.341 ..P WKT 2010 08 24 18 39 55 31.3200 -97.3300 251.000 457.0 114.242 5.050 -999.990 -999.990 1.142 ..P WKT 2010 08 24 18 49 55 31.3200 -97.3300 251.000 30.0 109.456 5.620 -999.990 -999.990 1.095 ..P WKT 2010 08 24 18 54 55 31.3200 -97.3300 251.000 122.0 110.791 6.090 -999.990 -999.990 1.108 ..P WKT 2010 08 24 18 59 55 31.3200 -97.3300 251.000 457.0 110.578 5.310 -999.990 -999.990 1.106 ..P WKT 2010 08 24 19 04 55 31.3200 -97.3300 251.000 30.0 105.016 4.980 -999.990 -999.990 1.050 ..P WKT 2010 08 24 19 09 55 31.3200 -97.3300 251.000 122.0 128.460 5.110 -999.990 -999.990 1.285 ..P WKT 2010 08 24 19 14 55 31.3200 -97.3300 251.000 457.0 134.588 5.310 -999.990 -999.990 1.346 ..P WKT 2010 08 24 19 24 55 31.3200 -97.3300 251.000 30.0 119.719 5.280 -999.990 -999.990 1.197 ..P WKT 2010 08 24 19 29 55 31.3200 -97.3300 251.000 122.0 131.124 6.030 -999.990 -999.990 1.311 ..P WKT 2010 08 24 19 34 55 31.3200 -97.3300 251.000 457.0 123.646 5.910 -999.990 -999.990 1.236 ..P WKT 2010 08 24 19 39 55 31.3200 -97.3300 251.000 30.0 116.306 5.020 -999.990 -999.990 1.163 ..P WKT 2010 08 24 19 44 55 31.3200 -97.3300 251.000 122.0 126.589 5.190 -999.990 -999.990 1.266 ..P WKT 2010 08 24 19 49 55 31.3200 -97.3300 251.000 457.0 118.965 5.360 -999.990 -999.990 1.190 ..P WKT 2010 08 24 19 59 55 31.3200 -97.3300 251.000 30.0 118.702 5.210 -999.990 -999.990 1.187 ..P WKT 2010 08 24 20 04 55 31.3200 -97.3300 251.000 122.0 130.162 5.580 -999.990 -999.990 1.302 ..P WKT 2010 08 24 20 09 55 31.3200 -97.3300 251.000 457.0 123.420 5.340 -999.990 -999.990 1.234 ..P WKT 2010 08 24 20 14 55 31.3200 -97.3300 251.000 30.0 117.664 5.060 -999.990 -999.990 1.177 ..P WKT 2010 08 24 20 19 55 31.3200 -97.3300 251.000 122.0 134.071 5.110 -999.990 -999.990 1.341 ..P WKT 2010 08 24 20 24 55 31.3200 -97.3300 251.000 457.0 129.021 6.340 -999.990 -999.990 1.290 ..P WKT 2010 08 24 20 34 55 31.3200 -97.3300 251.000 30.0 132.697 5.020 -999.990 -999.990 1.327 ..P WKT 2010 08 24 20 39 55 31.3200 -97.3300 251.000 122.0 141.712 4.950 -999.990 -999.990 1.417 ..P WKT 2010 08 24 20 44 55 31.3200 -97.3300 251.000 457.0 128.685 4.760 -999.990 -999.990 1.287 ..P WKT 2010 08 24 20 49 55 31.3200 -97.3300 251.000 30.0 115.370 5.230 -999.990 -999.990 1.154 ..P WKT 2010 08 24 20 54 55 31.3200 -97.3300 251.000 122.0 120.146 5.250 -999.990 -999.990 1.201 ..P WKT 2010 08 24 20 59 55 31.3200 -97.3300 251.000 457.0 118.985 5.560 -999.990 -999.990 1.190 ..P WKT 2010 08 24 21 09 55 31.3200 -97.3300 251.000 30.0 116.580 4.630 -999.990 -999.990 1.166 ..P WKT 2010 08 24 21 14 55 31.3200 -97.3300 251.000 122.0 119.864 5.670 -999.990 -999.990 1.199 ..P WKT 2010 08 24 21 19 55 31.3200 -97.3300 251.000 457.0 117.489 5.100 -999.990 -999.990 1.175 ..P WKT 2010 08 24 21 24 55 31.3200 -97.3300 251.000 30.0 121.907 5.310 -999.990 -999.990 1.219 ..P WKT 2010 08 24 21 29 55 31.3200 -97.3300 251.000 122.0 120.097 5.000 -999.990 -999.990 1.201 ..P WKT 2010 08 24 21 34 55 31.3200 -97.3300 251.000 457.0 133.295 5.430 -999.990 -999.990 1.333 ..P WKT 2010 08 24 21 44 55 31.3200 -97.3300 251.000 30.0 121.382 5.250 -999.990 -999.990 1.214 ..P WKT 2010 08 24 21 49 55 31.3200 -97.3300 251.000 122.0 121.474 5.390 -999.990 -999.990 1.215 ..P WKT 2010 08 24 21 54 55 31.3200 -97.3300 251.000 457.0 126.950 5.380 -999.990 -999.990 1.270 ..P WKT 2010 08 24 21 59 55 31.3200 -97.3300 251.000 30.0 116.555 5.790 -999.990 -999.990 1.166 ..P WKT 2010 08 24 22 04 55 31.3200 -97.3300 251.000 122.0 123.733 5.410 -999.990 -999.990 1.237 ..P WKT 2010 08 24 22 09 55 31.3200 -97.3300 251.000 457.0 142.254 4.870 -999.990 -999.990 1.423 ..P WKT 2010 08 24 22 19 55 31.3200 -97.3300 251.000 30.0 131.668 5.980 -999.990 -999.990 1.317 ..P WKT 2010 08 24 22 24 55 31.3200 -97.3300 251.000 122.0 145.520 5.370 -999.990 -999.990 1.455 ..P WKT 2010 08 24 22 29 55 31.3200 -97.3300 251.000 457.0 145.190 5.810 -999.990 -999.990 1.452 ..P WKT 2010 08 24 22 34 55 31.3200 -97.3300 251.000 30.0 134.503 5.550 -999.990 -999.990 1.345 ..P WKT 2010 08 24 22 39 55 31.3200 -97.3300 251.000 122.0 142.402 5.090 -999.990 -999.990 1.424 ..P WKT 2010 08 24 22 44 55 31.3200 -97.3300 251.000 457.0 147.182 5.430 -999.990 -999.990 1.472 ..P WKT 2010 08 24 22 54 55 31.3200 -97.3300 251.000 30.0 148.471 5.300 -999.990 -999.990 1.485 ..P WKT 2010 08 24 22 59 55 31.3200 -97.3300 251.000 122.0 161.026 6.000 -999.990 -999.990 1.610 ..P WKT 2010 08 24 23 04 55 31.3200 -97.3300 251.000 457.0 146.879 5.700 -999.990 -999.990 1.469 ..P WKT 2010 08 24 23 09 55 31.3200 -97.3300 251.000 30.0 156.738 5.450 -999.990 -999.990 1.567 ..P WKT 2010 08 24 23 14 55 31.3200 -97.3300 251.000 122.0 169.870 5.380 -999.990 -999.990 1.699 ..P WKT 2010 08 24 23 19 55 31.3200 -97.3300 251.000 457.0 158.134 7.480 -999.990 -999.990 1.581 ..P WKT 2010 08 24 23 29 55 31.3200 -97.3300 251.000 30.0 170.100 6.470 -999.990 -999.990 1.701 ..P WKT 2010 08 24 23 34 55 31.3200 -97.3300 251.000 122.0 173.479 6.440 -999.990 -999.990 1.735 ..P WKT 2010 08 24 23 39 55 31.3200 -97.3300 251.000 457.0 156.947 5.470 -999.990 -999.990 1.569 ..P WKT 2010 08 24 23 44 55 31.3200 -97.3300 251.000 30.0 162.175 6.190 -999.990 -999.990 1.622 ..P WKT 2010 08 24 23 49 55 31.3200 -97.3300 251.000 122.0 164.274 5.780 -999.990 -999.990 1.643 ..P WKT 2010 08 25 00 09 55 31.3200 -97.3300 251.000 457.0 158.502 5.140 -999.990 -999.990 1.585 ..P WKT 2010 08 25 00 10 25 31.3200 -97.3300 251.000 457.0 161.933 5.710 -999.990 -999.990 1.619 ..P WKT 2010 08 25 00 10 55 31.3200 -97.3300 251.000 457.0 164.938 5.460 -999.990 -999.990 1.649 ..P WKT 2010 08 25 00 11 25 31.3200 -97.3300 251.000 457.0 158.979 5.640 -999.990 -999.990 1.590 ..P WKT 2010 08 25 00 11 55 31.3200 -97.3300 251.000 457.0 159.850 5.260 -999.990 -999.990 1.599 ..P WKT 2010 08 25 00 12 25 31.3200 -97.3300 251.000 457.0 162.001 5.700 -999.990 -999.990 1.620 ..P WKT 2010 08 25 00 12 55 31.3200 -97.3300 251.000 457.0 163.156 6.670 -999.990 -999.990 1.632 ..P WKT 2010 08 25 00 13 25 31.3200 -97.3300 251.000 457.0 164.168 7.060 -999.990 -999.990 1.642 ..P WKT 2010 08 25 00 13 55 31.3200 -97.3300 251.000 457.0 166.319 6.060 -999.990 -999.990 1.663 ..P WKT 2010 08 25 00 14 25 31.3200 -97.3300 251.000 457.0 158.654 5.270 -999.990 -999.990 1.587 ..P WKT 2010 08 25 00 14 55 31.3200 -97.3300 251.000 457.0 160.805 5.190 -999.990 -999.990 1.608 ..P WKT 2010 08 25 00 19 55 31.3200 -97.3300 251.000 30.0 151.587 5.470 -999.990 -999.990 1.516 ..P WKT 2010 08 25 00 24 55 31.3200 -97.3300 251.000 122.0 171.094 5.180 -999.990 -999.990 1.711 ..P WKT 2010 08 25 00 29 55 31.3200 -97.3300 251.000 457.0 165.859 5.220 -999.990 -999.990 1.659 ..P WKT 2010 08 25 00 34 55 31.3200 -97.3300 251.000 30.0 147.836 5.770 -999.990 -999.990 1.478 ..P WKT 2010 08 25 00 39 55 31.3200 -97.3300 251.000 122.0 162.783 5.720 -999.990 -999.990 1.628 ..P WKT 2010 08 25 00 44 55 31.3200 -97.3300 251.000 457.0 163.519 5.320 -999.990 -999.990 1.635 ..P WKT 2010 08 25 00 54 55 31.3200 -97.3300 251.000 30.0 146.522 5.930 -999.990 -999.990 1.465 ..P WKT 2010 08 25 00 59 55 31.3200 -97.3300 251.000 122.0 167.122 5.440 -999.990 -999.990 1.671 ..P WKT 2010 08 25 01 04 55 31.3200 -97.3300 251.000 457.0 162.452 4.980 -999.990 -999.990 1.625 ..P WKT 2010 08 25 01 09 55 31.3200 -97.3300 251.000 30.0 152.962 5.560 -999.990 -999.990 1.530 ..P WKT 2010 08 25 01 14 55 31.3200 -97.3300 251.000 122.0 166.737 5.120 -999.990 -999.990 1.667 ..P WKT 2010 08 25 01 19 55 31.3200 -97.3300 251.000 457.0 169.445 4.940 -999.990 -999.990 1.694 ..P WKT 2010 08 25 01 29 55 31.3200 -97.3300 251.000 30.0 158.293 4.830 -999.990 -999.990 1.583 ..P WKT 2010 08 25 01 34 55 31.3200 -97.3300 251.000 122.0 169.667 5.480 -999.990 -999.990 1.697 ..P WKT 2010 08 25 01 39 55 31.3200 -97.3300 251.000 457.0 171.683 5.710 -999.990 -999.990 1.717 ..P WKT 2010 08 25 01 44 55 31.3200 -97.3300 251.000 30.0 165.483 6.280 -999.990 -999.990 1.655 ..P WKT 2010 08 25 01 49 55 31.3200 -97.3300 251.000 122.0 177.413 6.280 -999.990 -999.990 1.774 ..P WKT 2010 08 25 01 54 55 31.3200 -97.3300 251.000 457.0 173.197 4.700 -999.990 -999.990 1.732 ..P WKT 2010 08 25 02 04 55 31.3200 -97.3300 251.000 30.0 173.382 4.700 -999.990 -999.990 1.734 ..P WKT 2010 08 25 02 09 55 31.3200 -97.3300 251.000 122.0 192.493 5.500 -999.990 -999.990 1.925 ..P WKT 2010 08 25 02 14 55 31.3200 -97.3300 251.000 457.0 185.287 5.650 -999.990 -999.990 1.853 ..P WKT 2010 08 25 02 19 55 31.3200 -97.3300 251.000 30.0 197.175 7.560 -999.990 -999.990 1.972 ..P WKT 2010 08 25 02 24 55 31.3200 -97.3300 251.000 122.0 205.382 6.160 -999.990 -999.990 2.054 ..P WKT 2010 08 25 02 29 55 31.3200 -97.3300 251.000 457.0 183.902 5.520 -999.990 -999.990 1.839 ..P WKT 2010 08 25 02 39 55 31.3200 -97.3300 251.000 30.0 186.867 5.380 -999.990 -999.990 1.869 ..P WKT 2010 08 25 02 44 55 31.3200 -97.3300 251.000 122.0 171.884 5.960 -999.990 -999.990 1.719 ..P WKT 2010 08 25 02 49 55 31.3200 -97.3300 251.000 457.0 167.640 6.220 -999.990 -999.990 1.676 ..P WKT 2010 08 25 02 54 55 31.3200 -97.3300 251.000 30.0 161.703 6.660 -999.990 -999.990 1.617 ..P WKT 2010 08 25 02 59 55 31.3200 -97.3300 251.000 122.0 168.896 6.230 -999.990 -999.990 1.689 ..P WKT 2010 08 25 03 04 55 31.3200 -97.3300 251.000 457.0 198.664 5.070 -999.990 -999.990 1.987 ..P WKT 2010 08 25 03 14 55 31.3200 -97.3300 251.000 30.0 173.005 6.110 -999.990 -999.990 1.730 ..P WKT 2010 08 25 03 19 55 31.3200 -97.3300 251.000 122.0 175.293 5.880 -999.990 -999.990 1.753 ..P WKT 2010 08 25 03 24 55 31.3200 -97.3300 251.000 457.0 197.882 6.590 -999.990 -999.990 1.979 ..P WKT 2010 08 25 03 29 55 31.3200 -97.3300 251.000 30.0 168.591 6.090 -999.990 -999.990 1.686 ..P WKT 2010 08 25 03 34 55 31.3200 -97.3300 251.000 122.0 173.979 5.130 -999.990 -999.990 1.740 ..P WKT 2010 08 25 03 39 55 31.3200 -97.3300 251.000 457.0 184.295 5.110 -999.990 -999.990 1.843 ..P WKT 2010 08 25 03 49 55 31.3200 -97.3300 251.000 30.0 160.919 5.510 -999.990 -999.990 1.609 ..P WKT 2010 08 25 03 54 55 31.3200 -97.3300 251.000 122.0 167.088 5.220 -999.990 -999.990 1.671 ..P WKT 2010 08 25 03 59 55 31.3200 -97.3300 251.000 457.0 170.017 5.400 -999.990 -999.990 1.700 ..P WKT 2010 08 25 04 04 55 31.3200 -97.3300 251.000 30.0 162.250 4.960 -999.990 -999.990 1.623 ..P WKT 2010 08 25 04 09 55 31.3200 -97.3300 251.000 122.0 166.726 4.530 -999.990 -999.990 1.667 ..P WKT 2010 08 25 04 14 55 31.3200 -97.3300 251.000 457.0 173.732 3.870 -999.990 -999.990 1.737 ..P WKT 2010 08 25 04 24 55 31.3200 -97.3300 251.000 30.0 152.547 4.250 -999.990 -999.990 1.525 ..P WKT 2010 08 25 04 29 55 31.3200 -97.3300 251.000 122.0 160.213 3.920 -999.990 -999.990 1.602 ..P WKT 2010 08 25 04 34 55 31.3200 -97.3300 251.000 457.0 173.497 3.920 -999.990 -999.990 1.735 ..P WKT 2010 08 25 04 39 55 31.3200 -97.3300 251.000 30.0 154.183 4.410 -999.990 -999.990 1.542 ..P WKT 2010 08 25 04 44 55 31.3200 -97.3300 251.000 122.0 162.124 4.210 -999.990 -999.990 1.621 ..P WKT 2010 08 25 04 49 55 31.3200 -97.3300 251.000 457.0 172.028 4.010 -999.990 -999.990 1.720 ..P WKT 2010 08 25 05 04 55 31.3200 -97.3300 251.000 30.0 150.195 4.320 -999.990 -999.990 1.502 ..P WKT 2010 08 25 05 09 55 31.3200 -97.3300 251.000 122.0 154.962 3.490 -999.990 -999.990 1.550 ..P WKT 2010 08 25 05 14 55 31.3200 -97.3300 251.000 457.0 156.361 4.190 -999.990 -999.990 1.564 ..P WKT 2010 08 25 05 19 55 31.3200 -97.3300 251.000 30.0 151.589 3.420 -999.990 -999.990 1.516 ..P WKT 2010 08 25 05 24 55 31.3200 -97.3300 251.000 122.0 160.558 3.360 -999.990 -999.990 1.606 ..P WKT 2010 08 25 05 29 55 31.3200 -97.3300 251.000 457.0 153.545 3.260 -999.990 -999.990 1.535 ..P WKT 2010 08 25 05 39 55 31.3200 -97.3300 251.000 30.0 145.733 3.280 -999.990 -999.990 1.457 ..P WKT 2010 08 25 05 44 55 31.3200 -97.3300 251.000 122.0 158.376 3.370 -999.990 -999.990 1.584 ..P WKT 2010 08 25 05 49 55 31.3200 -97.3300 251.000 457.0 157.291 4.040 -999.990 -999.990 1.573 ..P WKT 2010 08 25 05 54 55 31.3200 -97.3300 251.000 30.0 150.328 4.090 -999.990 -999.990 1.503 ..P WKT 2010 08 25 05 59 55 31.3200 -97.3300 251.000 122.0 149.245 2.970 -999.990 -999.990 1.492 ..P WKT 2010 08 25 06 04 55 31.3200 -97.3300 251.000 457.0 147.604 2.850 -999.990 -999.990 1.476 ..P WKT 2010 08 25 06 14 55 31.3200 -97.3300 251.000 30.0 154.212 3.340 -999.990 -999.990 1.542 ..P WKT 2010 08 25 06 19 55 31.3200 -97.3300 251.000 122.0 162.597 5.190 -999.990 -999.990 1.626 ..P WKT 2010 08 25 06 24 55 31.3200 -97.3300 251.000 457.0 166.086 3.670 -999.990 -999.990 1.661 ..P WKT 2010 08 25 06 29 55 31.3200 -97.3300 251.000 30.0 159.651 3.460 -999.990 -999.990 1.597 ..P WKT 2010 08 25 06 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 08 25 06 39 55 31.3200 -97.3300 251.000 457.0 162.994 3.360 -999.990 -999.990 1.630 ..P WKT 2010 08 25 06 49 55 31.3200 -97.3300 251.000 30.0 162.783 3.900 -999.990 -999.990 1.628 ..P WKT 2010 08 25 06 54 55 31.3200 -97.3300 251.000 122.0 175.141 3.710 -999.990 -999.990 1.751 ..P WKT 2010 08 25 06 59 55 31.3200 -97.3300 251.000 457.0 159.861 3.890 -999.990 -999.990 1.599 ..P WKT 2010 08 25 07 04 55 31.3200 -97.3300 251.000 30.0 166.074 3.290 -999.990 -999.990 1.661 ..P WKT 2010 08 25 07 09 55 31.3200 -97.3300 251.000 122.0 169.356 3.690 -999.990 -999.990 1.694 ..P WKT 2010 08 25 07 14 55 31.3200 -97.3300 251.000 457.0 164.826 3.310 -999.990 -999.990 1.648 ..P WKT 2010 08 25 07 24 55 31.3200 -97.3300 251.000 30.0 171.186 3.340 -999.990 -999.990 1.712 ..P WKT 2010 08 25 07 29 55 31.3200 -97.3300 251.000 122.0 177.190 3.510 -999.990 -999.990 1.772 ..P WKT 2010 08 25 07 34 55 31.3200 -97.3300 251.000 457.0 172.603 3.330 -999.990 -999.990 1.726 ..P WKT 2010 08 25 07 39 55 31.3200 -97.3300 251.000 30.0 171.779 3.470 -999.990 -999.990 1.718 ..P WKT 2010 08 25 07 44 55 31.3200 -97.3300 251.000 122.0 181.260 3.530 -999.990 -999.990 1.813 ..P WKT 2010 08 25 07 49 55 31.3200 -97.3300 251.000 457.0 181.131 3.390 -999.990 -999.990 1.811 ..P WKT 2010 08 25 07 59 55 31.3200 -97.3300 251.000 30.0 175.882 3.570 -999.990 -999.990 1.759 ..P WKT 2010 08 25 08 04 55 31.3200 -97.3300 251.000 122.0 181.895 3.630 -999.990 -999.990 1.819 ..P WKT 2010 08 25 08 09 55 31.3200 -97.3300 251.000 457.0 184.428 4.080 -999.990 -999.990 1.844 ..P WKT 2010 08 25 08 14 55 31.3200 -97.3300 251.000 30.0 175.836 4.780 -999.990 -999.990 1.758 ..P WKT 2010 08 25 08 19 55 31.3200 -97.3300 251.000 122.0 188.101 4.630 -999.990 -999.990 1.881 ..P WKT 2010 08 25 08 24 55 31.3200 -97.3300 251.000 457.0 188.407 3.800 -999.990 -999.990 1.884 ..P WKT 2010 08 25 08 34 55 31.3200 -97.3300 251.000 30.0 178.540 4.830 -999.990 -999.990 1.785 ..P WKT 2010 08 25 08 39 55 31.3200 -97.3300 251.000 122.0 180.038 4.060 -999.990 -999.990 1.800 ..P WKT 2010 08 25 08 44 55 31.3200 -97.3300 251.000 457.0 187.367 4.480 -999.990 -999.990 1.874 ..P WKT 2010 08 25 08 49 55 31.3200 -97.3300 251.000 30.0 173.038 4.470 -999.990 -999.990 1.730 ..P WKT 2010 08 25 08 54 55 31.3200 -97.3300 251.000 122.0 179.532 3.810 -999.990 -999.990 1.795 ..P WKT 2010 08 25 08 59 55 31.3200 -97.3300 251.000 457.0 180.196 3.870 -999.990 -999.990 1.802 ..P WKT 2010 08 25 09 09 55 31.3200 -97.3300 251.000 30.0 170.666 2.920 -999.990 -999.990 1.707 ..P WKT 2010 08 25 09 14 55 31.3200 -97.3300 251.000 122.0 171.293 4.260 -999.990 -999.990 1.713 ..P WKT 2010 08 25 09 19 55 31.3200 -97.3300 251.000 457.0 172.196 5.470 -999.990 -999.990 1.722 ..P WKT 2010 08 25 09 24 55 31.3200 -97.3300 251.000 30.0 160.626 4.340 -999.990 -999.990 1.606 ..P WKT 2010 08 25 09 29 55 31.3200 -97.3300 251.000 122.0 160.423 2.760 -999.990 -999.990 1.604 ..P WKT 2010 08 25 09 34 55 31.3200 -97.3300 251.000 457.0 172.964 3.440 -999.990 -999.990 1.730 ..P WKT 2010 08 25 09 44 55 31.3200 -97.3300 251.000 30.0 142.032 3.040 -999.990 -999.990 1.420 ..P WKT 2010 08 25 09 49 55 31.3200 -97.3300 251.000 122.0 143.159 3.860 -999.990 -999.990 1.432 ..P WKT 2010 08 25 09 54 55 31.3200 -97.3300 251.000 457.0 155.633 4.670 -999.990 -999.990 1.556 ..P WKT 2010 08 25 09 59 55 31.3200 -97.3300 251.000 30.0 132.405 3.850 -999.990 -999.990 1.324 ..P WKT 2010 08 25 10 04 55 31.3200 -97.3300 251.000 122.0 137.958 4.640 -999.990 -999.990 1.380 ..P WKT 2010 08 25 10 09 55 31.3200 -97.3300 251.000 457.0 164.253 3.950 -999.990 -999.990 1.643 ..P WKT 2010 08 25 10 19 55 31.3200 -97.3300 251.000 30.0 137.386 4.110 -999.990 -999.990 1.374 ..P WKT 2010 08 25 10 24 55 31.3200 -97.3300 251.000 122.0 138.847 3.270 -999.990 -999.990 1.388 ..P WKT 2010 08 25 10 29 55 31.3200 -97.3300 251.000 457.0 177.196 3.780 -999.990 -999.990 1.772 ..P WKT 2010 08 25 10 34 55 31.3200 -97.3300 251.000 30.0 135.276 3.790 -999.990 -999.990 1.353 ..P WKT 2010 08 25 10 39 55 31.3200 -97.3300 251.000 122.0 134.942 4.200 -999.990 -999.990 1.349 ..P WKT 2010 08 25 10 44 55 31.3200 -97.3300 251.000 457.0 180.028 4.560 -999.990 -999.990 1.800 ..P WKT 2010 08 25 10 54 55 31.3200 -97.3300 251.000 30.0 126.587 4.270 -999.990 -999.990 1.266 ..P WKT 2010 08 25 10 59 55 31.3200 -97.3300 251.000 122.0 131.320 3.790 -999.990 -999.990 1.313 ..P WKT 2010 08 25 11 04 55 31.3200 -97.3300 251.000 457.0 172.462 4.590 -999.990 -999.990 1.725 ..P WKT 2010 08 25 11 09 55 31.3200 -97.3300 251.000 30.0 130.437 2.880 -999.990 -999.990 1.304 ..P WKT 2010 08 25 11 14 55 31.3200 -97.3300 251.000 122.0 133.787 2.880 -999.990 -999.990 1.338 ..P WKT 2010 08 25 11 19 55 31.3200 -97.3300 251.000 457.0 172.418 3.160 -999.990 -999.990 1.724 ..P WKT 2010 08 25 11 29 55 31.3200 -97.3300 251.000 30.0 132.837 1.940 -999.990 -999.990 1.328 ..P WKT 2010 08 25 11 34 55 31.3200 -97.3300 251.000 122.0 136.074 3.500 -999.990 -999.990 1.361 ..P WKT 2010 08 25 11 39 55 31.3200 -97.3300 251.000 457.0 163.131 2.840 -999.990 -999.990 1.631 ..P WKT 2010 08 25 11 44 55 31.3200 -97.3300 251.000 30.0 132.771 2.220 -999.990 -999.990 1.328 ..P WKT 2010 08 25 11 49 55 31.3200 -97.3300 251.000 122.0 135.182 2.890 -999.990 -999.990 1.352 ..P WKT 2010 08 25 12 09 55 31.3200 -97.3300 251.000 457.0 155.495 3.820 -999.990 -999.990 1.555 ..P WKT 2010 08 25 12 10 25 31.3200 -97.3300 251.000 457.0 161.541 2.360 -999.990 -999.990 1.615 ..P WKT 2010 08 25 12 10 55 31.3200 -97.3300 251.000 457.0 158.786 3.050 -999.990 -999.990 1.588 ..P WKT 2010 08 25 12 11 25 31.3200 -97.3300 251.000 457.0 155.755 2.320 -999.990 -999.990 1.558 ..P WKT 2010 08 25 12 11 55 31.3200 -97.3300 251.000 457.0 156.850 3.520 -999.990 -999.990 1.569 ..P WKT 2010 08 25 12 12 25 31.3200 -97.3300 251.000 457.0 160.971 2.390 -999.990 -999.990 1.610 ..P WKT 2010 08 25 12 12 55 31.3200 -97.3300 251.000 457.0 157.941 2.280 -999.990 -999.990 1.579 ..P WKT 2010 08 25 12 13 25 31.3200 -97.3300 251.000 457.0 156.010 2.800 -999.990 -999.990 1.560 ..P WKT 2010 08 25 12 13 55 31.3200 -97.3300 251.000 457.0 158.480 3.050 -999.990 -999.990 1.585 ..P WKT 2010 08 25 12 14 25 31.3200 -97.3300 251.000 457.0 153.525 2.620 -999.990 -999.990 1.535 ..P WKT 2010 08 25 12 14 55 31.3200 -97.3300 251.000 457.0 156.820 2.270 -999.990 -999.990 1.568 ..P WKT 2010 08 25 12 19 55 31.3200 -97.3300 251.000 30.0 140.548 3.470 -999.990 -999.990 1.405 ..P WKT 2010 08 25 12 24 55 31.3200 -97.3300 251.000 122.0 139.400 2.190 -999.990 -999.990 1.394 ..P WKT 2010 08 25 12 29 55 31.3200 -97.3300 251.000 457.0 152.548 3.600 -999.990 -999.990 1.525 ..P WKT 2010 08 25 12 34 55 31.3200 -97.3300 251.000 30.0 143.429 2.340 -999.990 -999.990 1.434 ..P WKT 2010 08 25 12 39 55 31.3200 -97.3300 251.000 122.0 148.054 2.620 -999.990 -999.990 1.481 ..P WKT 2010 08 25 12 44 55 31.3200 -97.3300 251.000 457.0 162.019 2.450 -999.990 -999.990 1.620 ..P WKT 2010 08 25 12 54 55 31.3200 -97.3300 251.000 30.0 142.901 2.730 -999.990 -999.990 1.429 ..P WKT 2010 08 25 12 59 55 31.3200 -97.3300 251.000 122.0 147.185 2.640 -999.990 -999.990 1.472 ..P WKT 2010 08 25 13 04 55 31.3200 -97.3300 251.000 457.0 152.840 2.860 -999.990 -999.990 1.528 ..P WKT 2010 08 25 13 09 55 31.3200 -97.3300 251.000 30.0 140.922 3.580 -999.990 -999.990 1.409 ..P WKT 2010 08 25 13 14 55 31.3200 -97.3300 251.000 122.0 143.008 3.400 -999.990 -999.990 1.430 ..P WKT 2010 08 25 13 19 55 31.3200 -97.3300 251.000 457.0 164.856 4.090 -999.990 -999.990 1.649 ..P WKT 2010 08 25 13 29 55 31.3200 -97.3300 251.000 30.0 146.557 2.230 -999.990 -999.990 1.466 ..P WKT 2010 08 25 13 34 55 31.3200 -97.3300 251.000 122.0 148.680 2.310 -999.990 -999.990 1.487 ..P WKT 2010 08 25 13 39 55 31.3200 -97.3300 251.000 457.0 170.279 2.880 -999.990 -999.990 1.703 ..P WKT 2010 08 25 13 44 55 31.3200 -97.3300 251.000 30.0 147.713 3.210 -999.990 -999.990 1.477 ..P WKT 2010 08 25 13 49 55 31.3200 -97.3300 251.000 122.0 146.818 2.490 -999.990 -999.990 1.468 ..P WKT 2010 08 25 13 54 55 31.3200 -97.3300 251.000 457.0 166.213 3.470 -999.990 -999.990 1.662 ..P WKT 2010 08 25 14 04 55 31.3200 -97.3300 251.000 30.0 140.219 3.330 -999.990 -999.990 1.402 ..P WKT 2010 08 25 14 09 55 31.3200 -97.3300 251.000 122.0 150.622 2.550 -999.990 -999.990 1.506 ..P WKT 2010 08 25 14 14 55 31.3200 -97.3300 251.000 457.0 167.050 2.410 -999.990 -999.990 1.671 ..P WKT 2010 08 25 14 19 55 31.3200 -97.3300 251.000 30.0 140.593 2.370 -999.990 -999.990 1.406 ..P WKT 2010 08 25 14 24 55 31.3200 -97.3300 251.000 122.0 149.074 2.060 -999.990 -999.990 1.491 ..P WKT 2010 08 25 14 29 55 31.3200 -97.3300 251.000 457.0 155.771 2.890 -999.990 -999.990 1.558 ..P WKT 2010 08 25 14 39 55 31.3200 -97.3300 251.000 30.0 144.848 3.430 -999.990 -999.990 1.448 ..P WKT 2010 08 25 14 44 55 31.3200 -97.3300 251.000 122.0 152.012 1.950 -999.990 -999.990 1.520 ..P WKT 2010 08 25 14 49 55 31.3200 -97.3300 251.000 457.0 165.333 3.230 -999.990 -999.990 1.653 ..P WKT 2010 08 25 14 54 55 31.3200 -97.3300 251.000 30.0 143.890 2.630 -999.990 -999.990 1.439 ..P WKT 2010 08 25 14 59 55 31.3200 -97.3300 251.000 122.0 147.493 3.180 -999.990 -999.990 1.475 ..P WKT 2010 08 25 15 04 55 31.3200 -97.3300 251.000 457.0 165.461 3.580 -999.990 -999.990 1.655 ..P WKT 2010 08 25 15 14 55 31.3200 -97.3300 251.000 30.0 147.883 2.450 -999.990 -999.990 1.479 ..P WKT 2010 08 25 15 19 55 31.3200 -97.3300 251.000 122.0 154.336 2.630 -999.990 -999.990 1.543 ..P WKT 2010 08 25 15 24 55 31.3200 -97.3300 251.000 457.0 172.956 2.460 -999.990 -999.990 1.730 ..P WKT 2010 08 25 15 29 55 31.3200 -97.3300 251.000 30.0 153.292 3.090 -999.990 -999.990 1.533 ..P WKT 2010 08 25 15 34 55 31.3200 -97.3300 251.000 122.0 161.655 2.830 -999.990 -999.990 1.617 ..P WKT 2010 08 25 15 39 55 31.3200 -97.3300 251.000 457.0 177.259 3.290 -999.990 -999.990 1.773 ..P WKT 2010 08 25 15 49 55 31.3200 -97.3300 251.000 30.0 151.343 2.660 -999.990 -999.990 1.513 ..P WKT 2010 08 25 15 54 55 31.3200 -97.3300 251.000 122.0 163.526 3.090 -999.990 -999.990 1.635 ..P WKT 2010 08 25 15 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 08 25 16 04 55 31.3200 -97.3300 251.000 30.0 157.564 3.880 -999.990 -999.990 1.576 ..P WKT 2010 08 25 16 09 55 31.3200 -97.3300 251.000 122.0 163.187 3.050 -999.990 -999.990 1.632 ..P WKT 2010 08 25 16 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 08 25 16 24 55 31.3200 -97.3300 251.000 30.0 165.305 3.180 -999.990 -999.990 1.653 ..P WKT 2010 08 25 16 29 55 31.3200 -97.3300 251.000 122.0 172.287 4.970 -999.990 -999.990 1.723 ..P WKT 2010 08 25 16 34 55 31.3200 -97.3300 251.000 457.0 174.902 2.740 -999.990 -999.990 1.749 ..P WKT 2010 08 25 16 39 55 31.3200 -97.3300 251.000 30.0 167.420 3.510 -999.990 -999.990 1.674 ..P WKT 2010 08 25 16 44 55 31.3200 -97.3300 251.000 122.0 173.854 2.790 -999.990 -999.990 1.739 ..P WKT 2010 08 25 16 49 55 31.3200 -97.3300 251.000 457.0 177.013 4.390 -999.990 -999.990 1.770 ..P WKT 2010 08 25 17 04 55 31.3200 -97.3300 251.000 30.0 163.395 2.440 -999.990 -999.990 1.634 ..P WKT 2010 08 25 17 09 55 31.3200 -97.3300 251.000 122.0 175.730 3.010 -999.990 -999.990 1.757 ..P WKT 2010 08 25 17 14 55 31.3200 -97.3300 251.000 457.0 168.436 4.120 -999.990 -999.990 1.684 ..P WKT 2010 08 25 17 19 55 31.3200 -97.3300 251.000 30.0 169.048 4.110 -999.990 -999.990 1.690 ..P WKT 2010 08 25 17 24 55 31.3200 -97.3300 251.000 122.0 176.471 3.480 -999.990 -999.990 1.765 ..P WKT 2010 08 25 17 29 55 31.3200 -97.3300 251.000 457.0 174.902 3.650 -999.990 -999.990 1.749 ..P WKT 2010 08 25 17 39 55 31.3200 -97.3300 251.000 30.0 175.300 2.710 -999.990 -999.990 1.753 ..P WKT 2010 08 25 17 44 55 31.3200 -97.3300 251.000 122.0 179.173 3.610 -999.990 -999.990 1.792 ..P WKT 2010 08 25 17 49 55 31.3200 -97.3300 251.000 457.0 181.684 4.980 -999.990 -999.990 1.817 ..P WKT 2010 08 25 17 54 55 31.3200 -97.3300 251.000 30.0 179.565 5.480 -999.990 -999.990 1.796 ..P WKT 2010 08 25 17 59 55 31.3200 -97.3300 251.000 122.0 188.880 5.640 -999.990 -999.990 1.889 ..P WKT 2010 08 25 18 04 55 31.3200 -97.3300 251.000 457.0 181.589 3.680 -999.990 -999.990 1.816 ..P WKT 2010 08 25 18 14 55 31.3200 -97.3300 251.000 30.0 184.760 4.400 -999.990 -999.990 1.848 ..P WKT 2010 08 25 18 19 55 31.3200 -97.3300 251.000 122.0 193.583 4.880 -999.990 -999.990 1.936 ..P WKT 2010 08 25 18 24 55 31.3200 -97.3300 251.000 457.0 186.762 5.430 -999.990 -999.990 1.868 ..P WKT 2010 08 25 18 29 55 31.3200 -97.3300 251.000 30.0 184.704 4.300 -999.990 -999.990 1.847 ..P WKT 2010 08 25 18 34 55 31.3200 -97.3300 251.000 122.0 185.229 4.060 -999.990 -999.990 1.852 ..P WKT 2010 08 25 18 39 55 31.3200 -97.3300 251.000 457.0 183.035 3.990 -999.990 -999.990 1.830 ..P WKT 2010 08 25 18 49 55 31.3200 -97.3300 251.000 30.0 186.590 3.980 -999.990 -999.990 1.866 ..P WKT 2010 08 25 18 54 55 31.3200 -97.3300 251.000 122.0 188.532 4.640 -999.990 -999.990 1.885 ..P WKT 2010 08 25 18 59 55 31.3200 -97.3300 251.000 457.0 190.337 5.270 -999.990 -999.990 1.903 ..P WKT 2010 08 25 19 04 55 31.3200 -97.3300 251.000 30.0 182.361 3.870 -999.990 -999.990 1.824 ..P WKT 2010 08 25 19 09 55 31.3200 -97.3300 251.000 122.0 190.007 2.950 -999.990 -999.990 1.900 ..P WKT 2010 08 25 19 14 55 31.3200 -97.3300 251.000 457.0 185.835 3.540 -999.990 -999.990 1.858 ..P WKT 2010 08 25 19 24 55 31.3200 -97.3300 251.000 30.0 193.381 2.970 -999.990 -999.990 1.934 ..P WKT 2010 08 25 19 29 55 31.3200 -97.3300 251.000 122.0 192.333 3.550 -999.990 -999.990 1.923 ..P WKT 2010 08 25 19 34 55 31.3200 -97.3300 251.000 457.0 188.436 3.370 -999.990 -999.990 1.884 ..P WKT 2010 08 25 19 39 55 31.3200 -97.3300 251.000 30.0 193.495 3.660 -999.990 -999.990 1.935 ..P WKT 2010 08 25 19 44 55 31.3200 -97.3300 251.000 122.0 195.433 4.070 -999.990 -999.990 1.954 ..P WKT 2010 08 25 19 49 55 31.3200 -97.3300 251.000 457.0 195.471 2.950 -999.990 -999.990 1.955 ..P WKT 2010 08 25 19 59 55 31.3200 -97.3300 251.000 30.0 191.808 3.670 -999.990 -999.990 1.918 ..P WKT 2010 08 25 20 04 55 31.3200 -97.3300 251.000 122.0 197.193 3.330 -999.990 -999.990 1.972 ..P WKT 2010 08 25 20 09 55 31.3200 -97.3300 251.000 457.0 190.645 4.100 -999.990 -999.990 1.906 ..P WKT 2010 08 25 20 14 55 31.3200 -97.3300 251.000 30.0 193.317 5.620 -999.990 -999.990 1.933 ..P WKT 2010 08 25 20 19 55 31.3200 -97.3300 251.000 122.0 190.838 5.220 -999.990 -999.990 1.908 ..P WKT 2010 08 25 20 24 55 31.3200 -97.3300 251.000 457.0 185.650 3.700 -999.990 -999.990 1.857 ..P WKT 2010 08 25 20 34 55 31.3200 -97.3300 251.000 30.0 190.915 3.220 -999.990 -999.990 1.909 ..P WKT 2010 08 25 20 39 55 31.3200 -97.3300 251.000 122.0 196.488 3.000 -999.990 -999.990 1.965 ..P WKT 2010 08 25 20 44 55 31.3200 -97.3300 251.000 457.0 192.037 3.240 -999.990 -999.990 1.920 ..P WKT 2010 08 25 20 49 55 31.3200 -97.3300 251.000 30.0 192.733 2.810 -999.990 -999.990 1.927 ..P WKT 2010 08 25 20 54 55 31.3200 -97.3300 251.000 122.0 197.491 3.380 -999.990 -999.990 1.975 ..P WKT 2010 08 25 20 59 55 31.3200 -97.3300 251.000 457.0 198.727 2.960 -999.990 -999.990 1.987 ..P WKT 2010 08 25 21 09 55 31.3200 -97.3300 251.000 30.0 183.142 2.360 -999.990 -999.990 1.831 ..P WKT 2010 08 25 21 14 55 31.3200 -97.3300 251.000 122.0 197.177 3.060 -999.990 -999.990 1.972 ..P WKT 2010 08 25 21 19 55 31.3200 -97.3300 251.000 457.0 198.490 2.790 -999.990 -999.990 1.985 ..P WKT 2010 08 25 21 24 55 31.3200 -97.3300 251.000 30.0 194.662 3.500 -999.990 -999.990 1.947 ..P WKT 2010 08 25 21 29 55 31.3200 -97.3300 251.000 122.0 195.434 3.350 -999.990 -999.990 1.954 ..P WKT 2010 08 25 21 34 55 31.3200 -97.3300 251.000 457.0 203.509 3.920 -999.990 -999.990 2.035 ..P WKT 2010 08 25 21 44 55 31.3200 -97.3300 251.000 30.0 197.092 3.520 -999.990 -999.990 1.971 ..P WKT 2010 08 25 21 49 55 31.3200 -97.3300 251.000 122.0 207.480 4.230 -999.990 -999.990 2.075 ..P WKT 2010 08 25 21 54 55 31.3200 -97.3300 251.000 457.0 203.539 3.680 -999.990 -999.990 2.035 ..P WKT 2010 08 25 21 59 55 31.3200 -97.3300 251.000 30.0 191.355 3.370 -999.990 -999.990 1.914 ..P WKT 2010 08 25 22 04 55 31.3200 -97.3300 251.000 122.0 196.065 3.830 -999.990 -999.990 1.961 ..P WKT 2010 08 25 22 09 55 31.3200 -97.3300 251.000 457.0 191.991 3.480 -999.990 -999.990 1.920 ..P WKT 2010 08 25 22 19 55 31.3200 -97.3300 251.000 30.0 194.615 3.790 -999.990 -999.990 1.946 ..P WKT 2010 08 25 22 24 55 31.3200 -97.3300 251.000 122.0 204.414 3.460 -999.990 -999.990 2.044 ..P WKT 2010 08 25 22 29 55 31.3200 -97.3300 251.000 457.0 196.523 3.340 -999.990 -999.990 1.965 ..P WKT 2010 08 25 22 34 55 31.3200 -97.3300 251.000 30.0 199.164 3.220 -999.990 -999.990 1.992 ..P WKT 2010 08 25 22 39 55 31.3200 -97.3300 251.000 122.0 211.252 3.620 -999.990 -999.990 2.113 ..P WKT 2010 08 25 22 44 55 31.3200 -97.3300 251.000 457.0 196.887 4.600 -999.990 -999.990 1.969 ..P WKT 2010 08 25 22 54 55 31.3200 -97.3300 251.000 30.0 190.890 3.570 -999.990 -999.990 1.909 ..P WKT 2010 08 25 22 59 55 31.3200 -97.3300 251.000 122.0 197.095 6.310 -999.990 -999.990 1.971 ..P WKT 2010 08 25 23 04 55 31.3200 -97.3300 251.000 457.0 178.751 3.550 -999.990 -999.990 1.788 ..P WKT 2010 08 25 23 09 55 31.3200 -97.3300 251.000 30.0 196.823 3.720 -999.990 -999.990 1.968 ..P WKT 2010 08 25 23 14 55 31.3200 -97.3300 251.000 122.0 201.272 2.870 -999.990 -999.990 2.013 ..P WKT 2010 08 25 23 19 55 31.3200 -97.3300 251.000 457.0 191.293 3.140 -999.990 -999.990 1.913 ..P WKT 2010 08 25 23 29 55 31.3200 -97.3300 251.000 30.0 194.270 3.390 -999.990 -999.990 1.943 ..P WKT 2010 08 25 23 34 55 31.3200 -97.3300 251.000 122.0 197.111 3.360 -999.990 -999.990 1.971 ..P WKT 2010 08 25 23 39 55 31.3200 -97.3300 251.000 457.0 195.101 3.220 -999.990 -999.990 1.951 ..P WKT 2010 08 25 23 44 55 31.3200 -97.3300 251.000 30.0 191.205 3.790 -999.990 -999.990 1.912 ..P WKT 2010 08 25 23 49 55 31.3200 -97.3300 251.000 122.0 196.470 3.500 -999.990 -999.990 1.965 ..P WKT 2010 08 26 00 09 55 31.3200 -97.3300 251.000 457.0 200.400 3.920 -999.990 -999.990 2.004 ..P WKT 2010 08 26 00 10 25 31.3200 -97.3300 251.000 457.0 195.007 4.720 -999.990 -999.990 1.950 ..P WKT 2010 08 26 00 10 55 31.3200 -97.3300 251.000 457.0 193.385 5.100 -999.990 -999.990 1.934 ..P WKT 2010 08 26 00 11 25 31.3200 -97.3300 251.000 457.0 200.652 3.810 -999.990 -999.990 2.007 ..P WKT 2010 08 26 00 11 55 31.3200 -97.3300 251.000 457.0 200.107 4.390 -999.990 -999.990 2.001 ..P WKT 2010 08 26 00 12 25 31.3200 -97.3300 251.000 457.0 198.486 3.960 -999.990 -999.990 1.985 ..P WKT 2010 08 26 00 12 55 31.3200 -97.3300 251.000 457.0 198.750 4.000 -999.990 -999.990 1.988 ..P WKT 2010 08 26 00 13 25 31.3200 -97.3300 251.000 457.0 196.858 3.920 -999.990 -999.990 1.969 ..P WKT 2010 08 26 00 13 55 31.3200 -97.3300 251.000 457.0 196.583 4.160 -999.990 -999.990 1.966 ..P WKT 2010 08 26 00 14 25 31.3200 -97.3300 251.000 457.0 207.082 3.880 -999.990 -999.990 2.071 ..P WKT 2010 08 26 00 14 55 31.3200 -97.3300 251.000 457.0 201.420 3.840 -999.990 -999.990 2.014 ..P WKT 2010 08 26 00 19 55 31.3200 -97.3300 251.000 30.0 202.441 3.800 -999.990 -999.990 2.024 ..P WKT 2010 08 26 00 24 55 31.3200 -97.3300 251.000 122.0 210.466 3.840 -999.990 -999.990 2.105 ..P WKT 2010 08 26 00 29 55 31.3200 -97.3300 251.000 457.0 206.368 3.480 -999.990 -999.990 2.064 ..P WKT 2010 08 26 00 34 55 31.3200 -97.3300 251.000 30.0 209.007 3.320 -999.990 -999.990 2.090 ..P WKT 2010 08 26 00 39 55 31.3200 -97.3300 251.000 122.0 221.345 3.660 -999.990 -999.990 2.213 ..P WKT 2010 08 26 00 44 55 31.3200 -97.3300 251.000 457.0 215.091 4.130 -999.990 -999.990 2.151 ..P WKT 2010 08 26 00 54 55 31.3200 -97.3300 251.000 30.0 203.143 3.470 -999.990 -999.990 2.031 ..P WKT 2010 08 26 00 59 55 31.3200 -97.3300 251.000 122.0 216.314 4.020 -999.990 -999.990 2.163 ..P WKT 2010 08 26 01 04 55 31.3200 -97.3300 251.000 457.0 214.123 3.580 -999.990 -999.990 2.141 ..P WKT 2010 08 26 01 09 55 31.3200 -97.3300 251.000 30.0 209.237 3.750 -999.990 -999.990 2.092 ..P WKT 2010 08 26 01 14 55 31.3200 -97.3300 251.000 122.0 216.210 4.550 -999.990 -999.990 2.162 ..P WKT 2010 08 26 01 19 55 31.3200 -97.3300 251.000 457.0 220.760 4.030 -999.990 -999.990 2.208 ..P WKT 2010 08 26 01 29 55 31.3200 -97.3300 251.000 30.0 208.365 4.030 -999.990 -999.990 2.084 ..P WKT 2010 08 26 01 34 55 31.3200 -97.3300 251.000 122.0 210.024 4.790 -999.990 -999.990 2.100 ..P WKT 2010 08 26 01 39 55 31.3200 -97.3300 251.000 457.0 220.584 4.440 -999.990 -999.990 2.206 ..P WKT 2010 08 26 01 44 55 31.3200 -97.3300 251.000 30.0 202.557 4.110 -999.990 -999.990 2.026 ..P WKT 2010 08 26 01 49 55 31.3200 -97.3300 251.000 122.0 204.082 4.320 -999.990 -999.990 2.041 ..P WKT 2010 08 26 01 54 55 31.3200 -97.3300 251.000 457.0 217.475 3.900 -999.990 -999.990 2.175 ..P WKT 2010 08 26 02 04 55 31.3200 -97.3300 251.000 30.0 199.756 3.830 -999.990 -999.990 1.998 ..P WKT 2010 08 26 02 09 55 31.3200 -97.3300 251.000 122.0 209.105 4.430 -999.990 -999.990 2.091 ..P WKT 2010 08 26 02 14 55 31.3200 -97.3300 251.000 457.0 209.417 4.640 -999.990 -999.990 2.094 ..P WKT 2010 08 26 02 19 55 31.3200 -97.3300 251.000 30.0 208.110 4.860 -999.990 -999.990 2.081 ..P WKT 2010 08 26 02 24 55 31.3200 -97.3300 251.000 122.0 206.398 4.760 -999.990 -999.990 2.064 ..P WKT 2010 08 26 02 29 55 31.3200 -97.3300 251.000 457.0 214.940 4.180 -999.990 -999.990 2.149 ..P WKT 2010 08 26 02 39 55 31.3200 -97.3300 251.000 30.0 195.593 4.060 -999.990 -999.990 1.956 ..P WKT 2010 08 26 02 44 55 31.3200 -97.3300 251.000 122.0 201.437 4.280 -999.990 -999.990 2.014 ..P WKT 2010 08 26 02 49 55 31.3200 -97.3300 251.000 457.0 195.270 4.250 -999.990 -999.990 1.953 ..P WKT 2010 08 26 02 54 55 31.3200 -97.3300 251.000 30.0 206.784 3.810 -999.990 -999.990 2.068 ..P WKT 2010 08 26 02 59 55 31.3200 -97.3300 251.000 122.0 217.760 4.040 -999.990 -999.990 2.178 ..P WKT 2010 08 26 03 04 55 31.3200 -97.3300 251.000 457.0 190.263 3.820 -999.990 -999.990 1.903 ..P WKT 2010 08 26 03 14 55 31.3200 -97.3300 251.000 30.0 221.244 3.550 -999.990 -999.990 2.212 ..P WKT 2010 08 26 03 19 55 31.3200 -97.3300 251.000 122.0 222.482 4.030 -999.990 -999.990 2.225 ..P WKT 2010 08 26 03 24 55 31.3200 -97.3300 251.000 457.0 172.140 3.840 -999.990 -999.990 1.721 ..P WKT 2010 08 26 03 29 55 31.3200 -97.3300 251.000 30.0 226.581 4.900 -999.990 -999.990 2.266 ..P WKT 2010 08 26 03 34 55 31.3200 -97.3300 251.000 122.0 225.119 3.690 -999.990 -999.990 2.251 ..P WKT 2010 08 26 03 39 55 31.3200 -97.3300 251.000 457.0 168.418 3.690 -999.990 -999.990 1.684 ..P WKT 2010 08 26 03 49 55 31.3200 -97.3300 251.000 30.0 218.109 4.570 -999.990 -999.990 2.181 ..P WKT 2010 08 26 03 54 55 31.3200 -97.3300 251.000 122.0 218.885 4.930 -999.990 -999.990 2.189 ..P WKT 2010 08 26 03 59 55 31.3200 -97.3300 251.000 457.0 165.352 3.540 -999.990 -999.990 1.654 ..P WKT 2010 08 26 04 04 55 31.3200 -97.3300 251.000 30.0 212.331 4.060 -999.990 -999.990 2.123 ..P WKT 2010 08 26 04 09 55 31.3200 -97.3300 251.000 122.0 217.971 4.460 -999.990 -999.990 2.180 ..P WKT 2010 08 26 04 14 55 31.3200 -97.3300 251.000 457.0 166.319 4.290 -999.990 -999.990 1.663 ..P WKT 2010 08 26 04 24 55 31.3200 -97.3300 251.000 30.0 215.937 4.120 -999.990 -999.990 2.159 ..P WKT 2010 08 26 04 29 55 31.3200 -97.3300 251.000 122.0 213.971 4.370 -999.990 -999.990 2.140 ..P WKT 2010 08 26 04 34 55 31.3200 -97.3300 251.000 457.0 175.783 4.040 -999.990 -999.990 1.758 ..P WKT 2010 08 26 04 39 55 31.3200 -97.3300 251.000 30.0 214.636 4.970 -999.990 -999.990 2.146 ..P WKT 2010 08 26 04 44 55 31.3200 -97.3300 251.000 122.0 209.967 3.880 -999.990 -999.990 2.100 ..P WKT 2010 08 26 04 49 55 31.3200 -97.3300 251.000 457.0 176.636 3.870 -999.990 -999.990 1.766 ..P WKT 2010 08 26 05 04 55 31.3200 -97.3300 251.000 30.0 213.206 3.790 -999.990 -999.990 2.132 ..P WKT 2010 08 26 05 09 55 31.3200 -97.3300 251.000 122.0 209.626 3.830 -999.990 -999.990 2.096 ..P WKT 2010 08 26 05 14 55 31.3200 -97.3300 251.000 457.0 173.861 3.830 -999.990 -999.990 1.739 ..P WKT 2010 08 26 05 19 55 31.3200 -97.3300 251.000 30.0 208.687 4.790 -999.990 -999.990 2.087 ..P WKT 2010 08 26 05 24 55 31.3200 -97.3300 251.000 122.0 219.984 4.180 -999.990 -999.990 2.200 ..P WKT 2010 08 26 05 29 55 31.3200 -97.3300 251.000 457.0 172.578 3.560 -999.990 -999.990 1.726 ..P WKT 2010 08 26 05 39 55 31.3200 -97.3300 251.000 30.0 218.606 3.690 -999.990 -999.990 2.186 ..P WKT 2010 08 26 05 44 55 31.3200 -97.3300 251.000 122.0 229.394 4.190 -999.990 -999.990 2.294 ..P WKT 2010 08 26 05 49 55 31.3200 -97.3300 251.000 457.0 173.346 4.280 -999.990 -999.990 1.733 ..P WKT 2010 08 26 05 54 55 31.3200 -97.3300 251.000 30.0 226.079 4.360 -999.990 -999.990 2.261 ..P WKT 2010 08 26 05 59 55 31.3200 -97.3300 251.000 122.0 230.375 4.360 -999.990 -999.990 2.304 ..P WKT 2010 08 26 06 04 55 31.3200 -97.3300 251.000 457.0 171.338 5.070 -999.990 -999.990 1.713 ..P WKT 2010 08 26 06 14 55 31.3200 -97.3300 251.000 30.0 233.735 4.870 -999.990 -999.990 2.337 ..P WKT 2010 08 26 06 19 55 31.3200 -97.3300 251.000 122.0 231.748 5.020 -999.990 -999.990 2.317 ..P WKT 2010 08 26 06 24 55 31.3200 -97.3300 251.000 457.0 180.624 5.090 -999.990 -999.990 1.806 ..P WKT 2010 08 26 06 29 55 31.3200 -97.3300 251.000 30.0 236.303 4.850 -999.990 -999.990 2.363 ..P WKT 2010 08 26 06 34 55 31.3200 -97.3300 251.000 122.0 236.753 4.880 -999.990 -999.990 2.368 ..P WKT 2010 08 26 06 39 55 31.3200 -97.3300 251.000 457.0 179.256 4.930 -999.990 -999.990 1.793 ..P WKT 2010 08 26 06 49 55 31.3200 -97.3300 251.000 30.0 232.785 6.710 -999.990 -999.990 2.328 ..P WKT 2010 08 26 06 54 55 31.3200 -97.3300 251.000 122.0 231.029 4.520 -999.990 -999.990 2.310 ..P WKT 2010 08 26 06 59 55 31.3200 -97.3300 251.000 457.0 181.873 3.930 -999.990 -999.990 1.819 ..P WKT 2010 08 26 07 04 55 31.3200 -97.3300 251.000 30.0 226.841 4.070 -999.990 -999.990 2.268 ..P WKT 2010 08 26 07 09 55 31.3200 -97.3300 251.000 122.0 230.367 4.160 -999.990 -999.990 2.304 ..P WKT 2010 08 26 07 14 55 31.3200 -97.3300 251.000 457.0 184.993 3.690 -999.990 -999.990 1.850 ..P WKT 2010 08 26 07 24 55 31.3200 -97.3300 251.000 30.0 231.717 4.080 -999.990 -999.990 2.317 ..P WKT 2010 08 26 07 29 55 31.3200 -97.3300 251.000 122.0 230.077 3.950 -999.990 -999.990 2.301 ..P WKT 2010 08 26 07 34 55 31.3200 -97.3300 251.000 457.0 185.349 3.510 -999.990 -999.990 1.853 ..P WKT 2010 08 26 07 39 55 31.3200 -97.3300 251.000 30.0 222.324 5.020 -999.990 -999.990 2.223 ..P WKT 2010 08 26 07 44 55 31.3200 -97.3300 251.000 122.0 223.800 3.750 -999.990 -999.990 2.238 ..P WKT 2010 08 26 07 49 55 31.3200 -97.3300 251.000 457.0 190.040 4.320 -999.990 -999.990 1.900 ..P WKT 2010 08 26 07 59 55 31.3200 -97.3300 251.000 30.0 215.139 3.810 -999.990 -999.990 2.151 ..P WKT 2010 08 26 08 04 55 31.3200 -97.3300 251.000 122.0 219.248 3.790 -999.990 -999.990 2.192 ..P WKT 2010 08 26 08 09 55 31.3200 -97.3300 251.000 457.0 185.401 4.210 -999.990 -999.990 1.854 ..P WKT 2010 08 26 08 14 55 31.3200 -97.3300 251.000 30.0 215.537 4.610 -999.990 -999.990 2.155 ..P WKT 2010 08 26 08 19 55 31.3200 -97.3300 251.000 122.0 218.292 4.560 -999.990 -999.990 2.183 ..P WKT 2010 08 26 08 24 55 31.3200 -97.3300 251.000 457.0 181.997 4.130 -999.990 -999.990 1.820 ..P WKT 2010 08 26 08 34 55 31.3200 -97.3300 251.000 30.0 211.175 4.060 -999.990 -999.990 2.112 ..P WKT 2010 08 26 08 39 55 31.3200 -97.3300 251.000 122.0 215.635 4.950 -999.990 -999.990 2.156 ..P WKT 2010 08 26 08 44 55 31.3200 -97.3300 251.000 457.0 180.493 4.020 -999.990 -999.990 1.805 ..P WKT 2010 08 26 08 49 55 31.3200 -97.3300 251.000 30.0 215.875 3.860 -999.990 -999.990 2.159 ..P WKT 2010 08 26 08 54 55 31.3200 -97.3300 251.000 122.0 218.165 4.150 -999.990 -999.990 2.182 ..P WKT 2010 08 26 08 59 55 31.3200 -97.3300 251.000 457.0 176.505 3.840 -999.990 -999.990 1.765 ..P WKT 2010 08 26 09 09 55 31.3200 -97.3300 251.000 30.0 201.781 3.480 -999.990 -999.990 2.018 ..P WKT 2010 08 26 09 14 55 31.3200 -97.3300 251.000 122.0 207.405 3.790 -999.990 -999.990 2.074 ..P WKT 2010 08 26 09 19 55 31.3200 -97.3300 251.000 457.0 188.063 4.080 -999.990 -999.990 1.881 ..P WKT 2010 08 26 09 24 55 31.3200 -97.3300 251.000 30.0 204.271 3.730 -999.990 -999.990 2.043 ..P WKT 2010 08 26 09 29 55 31.3200 -97.3300 251.000 122.0 208.268 3.780 -999.990 -999.990 2.083 ..P WKT 2010 08 26 09 34 55 31.3200 -97.3300 251.000 457.0 182.408 3.440 -999.990 -999.990 1.824 ..P WKT 2010 08 26 09 44 55 31.3200 -97.3300 251.000 30.0 203.818 4.750 -999.990 -999.990 2.038 ..P WKT 2010 08 26 09 49 55 31.3200 -97.3300 251.000 122.0 203.453 4.270 -999.990 -999.990 2.035 ..P WKT 2010 08 26 09 54 55 31.3200 -97.3300 251.000 457.0 169.692 5.360 -999.990 -999.990 1.697 ..P WKT 2010 08 26 09 59 55 31.3200 -97.3300 251.000 30.0 201.229 3.840 -999.990 -999.990 2.012 ..P WKT 2010 08 26 10 04 55 31.3200 -97.3300 251.000 122.0 208.059 4.530 -999.990 -999.990 2.081 ..P WKT 2010 08 26 10 09 55 31.3200 -97.3300 251.000 457.0 171.033 4.080 -999.990 -999.990 1.710 ..P WKT 2010 08 26 10 19 55 31.3200 -97.3300 251.000 30.0 206.304 4.430 -999.990 -999.990 2.063 ..P WKT 2010 08 26 10 24 55 31.3200 -97.3300 251.000 122.0 209.896 4.810 -999.990 -999.990 2.099 ..P WKT 2010 08 26 10 29 55 31.3200 -97.3300 251.000 457.0 174.102 5.130 -999.990 -999.990 1.741 ..P WKT 2010 08 26 10 34 55 31.3200 -97.3300 251.000 30.0 209.748 5.130 -999.990 -999.990 2.097 ..P WKT 2010 08 26 10 39 55 31.3200 -97.3300 251.000 122.0 214.292 5.670 -999.990 -999.990 2.143 ..P WKT 2010 08 26 10 44 55 31.3200 -97.3300 251.000 457.0 177.540 5.620 -999.990 -999.990 1.775 ..P WKT 2010 08 26 10 54 55 31.3200 -97.3300 251.000 30.0 208.481 5.950 -999.990 -999.990 2.085 ..P WKT 2010 08 26 10 59 55 31.3200 -97.3300 251.000 122.0 213.415 5.410 -999.990 -999.990 2.134 ..P WKT 2010 08 26 11 04 55 31.3200 -97.3300 251.000 457.0 173.780 5.100 -999.990 -999.990 1.738 ..P WKT 2010 08 26 11 09 55 31.3200 -97.3300 251.000 30.0 204.531 6.080 -999.990 -999.990 2.045 ..P WKT 2010 08 26 11 14 55 31.3200 -97.3300 251.000 122.0 206.068 4.910 -999.990 -999.990 2.061 ..P WKT 2010 08 26 11 19 55 31.3200 -97.3300 251.000 457.0 175.530 4.160 -999.990 -999.990 1.755 ..P WKT 2010 08 26 11 29 55 31.3200 -97.3300 251.000 30.0 211.440 4.380 -999.990 -999.990 2.114 ..P WKT 2010 08 26 11 34 55 31.3200 -97.3300 251.000 122.0 216.184 3.980 -999.990 -999.990 2.162 ..P WKT 2010 08 26 11 39 55 31.3200 -97.3300 251.000 457.0 187.894 4.220 -999.990 -999.990 1.879 ..P WKT 2010 08 26 11 44 55 31.3200 -97.3300 251.000 30.0 215.070 4.450 -999.990 -999.990 2.151 ..P WKT 2010 08 26 11 49 55 31.3200 -97.3300 251.000 122.0 206.627 4.080 -999.990 -999.990 2.066 ..P WKT 2010 08 26 12 09 55 31.3200 -97.3300 251.000 457.0 187.020 3.710 -999.990 -999.990 1.870 ..P WKT 2010 08 26 12 10 25 31.3200 -97.3300 251.000 457.0 185.058 3.910 -999.990 -999.990 1.851 ..P WKT 2010 08 26 12 10 55 31.3200 -97.3300 251.000 457.0 188.264 4.100 -999.990 -999.990 1.883 ..P WKT 2010 08 26 12 11 25 31.3200 -97.3300 251.000 457.0 181.679 3.680 -999.990 -999.990 1.817 ..P WKT 2010 08 26 12 11 55 31.3200 -97.3300 251.000 457.0 182.981 3.930 -999.990 -999.990 1.830 ..P WKT 2010 08 26 12 12 25 31.3200 -97.3300 251.000 457.0 185.371 3.960 -999.990 -999.990 1.854 ..P WKT 2010 08 26 12 12 55 31.3200 -97.3300 251.000 457.0 186.945 3.630 -999.990 -999.990 1.869 ..P WKT 2010 08 26 12 13 25 31.3200 -97.3300 251.000 457.0 185.528 4.300 -999.990 -999.990 1.855 ..P WKT 2010 08 26 12 13 55 31.3200 -97.3300 251.000 457.0 181.934 3.750 -999.990 -999.990 1.819 ..P WKT 2010 08 26 12 14 25 31.3200 -97.3300 251.000 457.0 184.596 3.890 -999.990 -999.990 1.846 ..P WKT 2010 08 26 12 14 55 31.3200 -97.3300 251.000 457.0 182.907 3.780 -999.990 -999.990 1.829 ..P WKT 2010 08 26 12 19 55 31.3200 -97.3300 251.000 30.0 210.071 3.930 -999.990 -999.990 2.101 ..P WKT 2010 08 26 12 24 55 31.3200 -97.3300 251.000 122.0 207.047 4.190 -999.990 -999.990 2.070 ..P WKT 2010 08 26 12 29 55 31.3200 -97.3300 251.000 457.0 180.902 4.190 -999.990 -999.990 1.809 ..P WKT 2010 08 26 12 34 55 31.3200 -97.3300 251.000 30.0 206.709 4.460 -999.990 -999.990 2.067 ..P WKT 2010 08 26 12 39 55 31.3200 -97.3300 251.000 122.0 206.404 4.880 -999.990 -999.990 2.064 ..P WKT 2010 08 26 12 44 55 31.3200 -97.3300 251.000 457.0 182.978 4.260 -999.990 -999.990 1.830 ..P WKT 2010 08 26 12 54 55 31.3200 -97.3300 251.000 30.0 205.083 4.900 -999.990 -999.990 2.051 ..P WKT 2010 08 26 12 59 55 31.3200 -97.3300 251.000 122.0 193.491 4.020 -999.990 -999.990 1.935 ..P WKT 2010 08 26 13 04 55 31.3200 -97.3300 251.000 457.0 186.795 4.480 -999.990 -999.990 1.868 ..P WKT 2010 08 26 13 09 55 31.3200 -97.3300 251.000 30.0 201.318 4.690 -999.990 -999.990 2.013 ..P WKT 2010 08 26 13 14 55 31.3200 -97.3300 251.000 122.0 197.343 4.360 -999.990 -999.990 1.973 ..P WKT 2010 08 26 13 19 55 31.3200 -97.3300 251.000 457.0 185.206 4.780 -999.990 -999.990 1.852 ..P WKT 2010 08 26 13 29 55 31.3200 -97.3300 251.000 30.0 207.568 3.840 -999.990 -999.990 2.076 ..P WKT 2010 08 26 13 34 55 31.3200 -97.3300 251.000 122.0 204.798 4.060 -999.990 -999.990 2.048 ..P WKT 2010 08 26 13 39 55 31.3200 -97.3300 251.000 457.0 185.839 4.940 -999.990 -999.990 1.858 ..P WKT 2010 08 26 13 44 55 31.3200 -97.3300 251.000 30.0 205.785 5.350 -999.990 -999.990 2.058 ..P WKT 2010 08 26 13 49 55 31.3200 -97.3300 251.000 122.0 202.607 4.860 -999.990 -999.990 2.026 ..P WKT 2010 08 26 13 54 55 31.3200 -97.3300 251.000 457.0 183.510 3.930 -999.990 -999.990 1.835 ..P WKT 2010 08 26 14 04 55 31.3200 -97.3300 251.000 30.0 209.802 4.680 -999.990 -999.990 2.098 ..P WKT 2010 08 26 14 09 55 31.3200 -97.3300 251.000 122.0 210.432 4.800 -999.990 -999.990 2.104 ..P WKT 2010 08 26 14 14 55 31.3200 -97.3300 251.000 457.0 182.900 5.040 -999.990 -999.990 1.829 ..P WKT 2010 08 26 14 19 55 31.3200 -97.3300 251.000 30.0 203.393 5.040 -999.990 -999.990 2.034 ..P WKT 2010 08 26 14 24 55 31.3200 -97.3300 251.000 122.0 208.240 4.520 -999.990 -999.990 2.082 ..P WKT 2010 08 26 14 29 55 31.3200 -97.3300 251.000 457.0 176.488 3.480 -999.990 -999.990 1.765 ..P WKT 2010 08 26 14 39 55 31.3200 -97.3300 251.000 30.0 204.494 4.240 -999.990 -999.990 2.045 ..P WKT 2010 08 26 14 44 55 31.3200 -97.3300 251.000 122.0 210.373 4.090 -999.990 -999.990 2.104 ..P WKT 2010 08 26 14 49 55 31.3200 -97.3300 251.000 457.0 168.899 5.000 -999.990 -999.990 1.689 ..P WKT 2010 08 26 14 54 55 31.3200 -97.3300 251.000 30.0 193.282 3.890 -999.990 -999.990 1.933 ..P WKT 2010 08 26 14 59 55 31.3200 -97.3300 251.000 122.0 204.332 4.260 -999.990 -999.990 2.043 ..P WKT 2010 08 26 15 04 55 31.3200 -97.3300 251.000 457.0 172.517 3.300 -999.990 -999.990 1.725 ..P WKT 2010 08 26 15 14 55 31.3200 -97.3300 251.000 30.0 203.053 3.190 -999.990 -999.990 2.031 ..P WKT 2010 08 26 15 19 55 31.3200 -97.3300 251.000 122.0 201.720 3.610 -999.990 -999.990 2.017 ..P WKT 2010 08 26 15 24 55 31.3200 -97.3300 251.000 457.0 167.589 3.580 -999.990 -999.990 1.676 ..P WKT 2010 08 26 15 29 55 31.3200 -97.3300 251.000 30.0 199.733 4.400 -999.990 -999.990 1.997 ..P WKT 2010 08 26 15 34 55 31.3200 -97.3300 251.000 122.0 199.896 3.560 -999.990 -999.990 1.999 ..P WKT 2010 08 26 15 39 55 31.3200 -97.3300 251.000 457.0 161.408 4.240 -999.990 -999.990 1.614 ..P WKT 2010 08 26 15 49 55 31.3200 -97.3300 251.000 30.0 193.251 5.780 -999.990 -999.990 1.933 ..P WKT 2010 08 26 15 54 55 31.3200 -97.3300 251.000 122.0 199.345 4.670 -999.990 -999.990 1.993 ..P WKT 2010 08 26 15 59 55 31.3200 -97.3300 251.000 457.0 153.990 3.610 -999.990 -999.990 1.540 ..P WKT 2010 08 26 16 04 55 31.3200 -97.3300 251.000 30.0 197.921 4.410 -999.990 -999.990 1.979 ..P WKT 2010 08 26 16 09 55 31.3200 -97.3300 251.000 122.0 204.287 4.280 -999.990 -999.990 2.043 ..P WKT 2010 08 26 16 14 55 31.3200 -97.3300 251.000 457.0 159.203 3.300 -999.990 -999.990 1.592 ..P WKT 2010 08 26 16 24 55 31.3200 -97.3300 251.000 30.0 198.031 3.380 -999.990 -999.990 1.980 ..P WKT 2010 08 26 16 29 55 31.3200 -97.3300 251.000 122.0 195.919 4.870 -999.990 -999.990 1.959 ..P WKT 2010 08 26 16 34 55 31.3200 -97.3300 251.000 457.0 167.944 3.360 -999.990 -999.990 1.679 ..P WKT 2010 08 26 16 39 55 31.3200 -97.3300 251.000 30.0 191.151 3.270 -999.990 -999.990 1.912 ..P WKT 2010 08 26 16 44 55 31.3200 -97.3300 251.000 122.0 199.113 3.430 -999.990 -999.990 1.991 ..P WKT 2010 08 26 16 49 55 31.3200 -97.3300 251.000 457.0 195.366 3.710 -999.990 -999.990 1.954 ..P WKT 2010 08 26 17 04 55 31.3200 -97.3300 251.000 30.0 180.138 3.600 -999.990 -999.990 1.801 ..P WKT 2010 08 26 17 09 55 31.3200 -97.3300 251.000 122.0 185.695 2.910 -999.990 -999.990 1.857 ..P WKT 2010 08 26 17 14 55 31.3200 -97.3300 251.000 457.0 171.921 3.210 -999.990 -999.990 1.719 ..P WKT 2010 08 26 17 19 55 31.3200 -97.3300 251.000 30.0 175.300 3.670 -999.990 -999.990 1.753 ..P WKT 2010 08 26 17 24 55 31.3200 -97.3300 251.000 122.0 184.398 3.320 -999.990 -999.990 1.844 ..P WKT 2010 08 26 17 29 55 31.3200 -97.3300 251.000 457.0 177.703 5.430 -999.990 -999.990 1.777 ..P WKT 2010 08 26 17 39 55 31.3200 -97.3300 251.000 30.0 183.190 3.850 -999.990 -999.990 1.832 ..P WKT 2010 08 26 17 44 55 31.3200 -97.3300 251.000 122.0 193.741 4.760 -999.990 -999.990 1.937 ..P WKT 2010 08 26 17 49 55 31.3200 -97.3300 251.000 457.0 182.505 3.610 -999.990 -999.990 1.825 ..P WKT 2010 08 26 17 54 55 31.3200 -97.3300 251.000 30.0 185.022 4.520 -999.990 -999.990 1.850 ..P WKT 2010 08 26 17 59 55 31.3200 -97.3300 251.000 122.0 183.045 4.270 -999.990 -999.990 1.830 ..P WKT 2010 08 26 18 04 55 31.3200 -97.3300 251.000 457.0 175.758 4.290 -999.990 -999.990 1.758 ..P WKT 2010 08 26 18 14 55 31.3200 -97.3300 251.000 30.0 177.873 4.310 -999.990 -999.990 1.779 ..P WKT 2010 08 26 18 19 55 31.3200 -97.3300 251.000 122.0 184.826 3.630 -999.990 -999.990 1.848 ..P WKT 2010 08 26 18 24 55 31.3200 -97.3300 251.000 457.0 184.153 4.260 -999.990 -999.990 1.842 ..P WKT 2010 08 26 18 29 55 31.3200 -97.3300 251.000 30.0 179.666 4.730 -999.990 -999.990 1.797 ..P WKT 2010 08 26 18 34 55 31.3200 -97.3300 251.000 122.0 178.039 3.300 -999.990 -999.990 1.780 ..P WKT 2010 08 26 18 39 55 31.3200 -97.3300 251.000 457.0 178.183 3.880 -999.990 -999.990 1.782 ..P WKT 2010 08 26 18 49 55 31.3200 -97.3300 251.000 30.0 175.494 4.000 -999.990 -999.990 1.755 ..P WKT 2010 08 26 18 54 55 31.3200 -97.3300 251.000 122.0 183.828 3.520 -999.990 -999.990 1.838 ..P WKT 2010 08 26 18 59 55 31.3200 -97.3300 251.000 457.0 172.824 4.370 -999.990 -999.990 1.728 ..P WKT 2010 08 26 19 04 55 31.3200 -97.3300 251.000 30.0 177.753 4.730 -999.990 -999.990 1.778 ..P WKT 2010 08 26 19 09 55 31.3200 -97.3300 251.000 122.0 188.540 4.330 -999.990 -999.990 1.885 ..P WKT 2010 08 26 19 14 55 31.3200 -97.3300 251.000 457.0 180.804 4.760 -999.990 -999.990 1.808 ..P WKT 2010 08 26 19 24 55 31.3200 -97.3300 251.000 30.0 188.077 3.360 -999.990 -999.990 1.881 ..P WKT 2010 08 26 19 29 55 31.3200 -97.3300 251.000 122.0 191.509 5.110 -999.990 -999.990 1.915 ..P WKT 2010 08 26 19 34 55 31.3200 -97.3300 251.000 457.0 184.861 5.590 -999.990 -999.990 1.849 ..P WKT 2010 08 26 19 39 55 31.3200 -97.3300 251.000 30.0 187.204 3.960 -999.990 -999.990 1.872 ..P WKT 2010 08 26 19 44 55 31.3200 -97.3300 251.000 122.0 194.178 3.830 -999.990 -999.990 1.942 ..P WKT 2010 08 26 19 49 55 31.3200 -97.3300 251.000 457.0 183.444 3.160 -999.990 -999.990 1.834 ..P WKT 2010 08 26 19 59 55 31.3200 -97.3300 251.000 30.0 177.640 2.910 -999.990 -999.990 1.776 ..P WKT 2010 08 26 20 04 55 31.3200 -97.3300 251.000 122.0 184.751 3.650 -999.990 -999.990 1.848 ..P WKT 2010 08 26 20 09 55 31.3200 -97.3300 251.000 457.0 177.422 3.870 -999.990 -999.990 1.774 ..P WKT 2010 08 26 20 14 55 31.3200 -97.3300 251.000 30.0 184.533 3.330 -999.990 -999.990 1.845 ..P WKT 2010 08 26 20 19 55 31.3200 -97.3300 251.000 122.0 193.006 2.670 -999.990 -999.990 1.930 ..P WKT 2010 08 26 20 24 55 31.3200 -97.3300 251.000 457.0 189.218 3.040 -999.990 -999.990 1.892 ..P WKT 2010 08 26 20 34 55 31.3200 -97.3300 251.000 30.0 185.847 3.890 -999.990 -999.990 1.858 ..P WKT 2010 08 26 20 39 55 31.3200 -97.3300 251.000 122.0 192.802 2.870 -999.990 -999.990 1.928 ..P WKT 2010 08 26 20 44 55 31.3200 -97.3300 251.000 457.0 186.952 3.340 -999.990 -999.990 1.870 ..P WKT 2010 08 26 20 49 55 31.3200 -97.3300 251.000 30.0 183.553 3.760 -999.990 -999.990 1.836 ..P WKT 2010 08 26 20 54 55 31.3200 -97.3300 251.000 122.0 186.967 3.320 -999.990 -999.990 1.870 ..P WKT 2010 08 26 20 59 55 31.3200 -97.3300 251.000 457.0 183.841 3.130 -999.990 -999.990 1.838 ..P WKT 2010 08 26 21 09 55 31.3200 -97.3300 251.000 30.0 189.442 2.150 -999.990 -999.990 1.894 ..P WKT 2010 08 26 21 14 55 31.3200 -97.3300 251.000 122.0 193.264 2.500 -999.990 -999.990 1.933 ..P WKT 2010 08 26 21 19 55 31.3200 -97.3300 251.000 457.0 179.647 3.320 -999.990 -999.990 1.796 ..P WKT 2010 08 26 21 24 55 31.3200 -97.3300 251.000 30.0 187.012 3.790 -999.990 -999.990 1.870 ..P WKT 2010 08 26 21 29 55 31.3200 -97.3300 251.000 122.0 187.564 3.070 -999.990 -999.990 1.876 ..P WKT 2010 08 26 21 34 55 31.3200 -97.3300 251.000 457.0 186.890 3.570 -999.990 -999.990 1.869 ..P WKT 2010 08 26 21 44 55 31.3200 -97.3300 251.000 30.0 181.962 3.570 -999.990 -999.990 1.820 ..P WKT 2010 08 26 21 49 55 31.3200 -97.3300 251.000 122.0 183.973 3.630 -999.990 -999.990 1.840 ..P WKT 2010 08 26 21 54 55 31.3200 -97.3300 251.000 457.0 175.494 3.720 -999.990 -999.990 1.755 ..P WKT 2010 08 26 21 59 55 31.3200 -97.3300 251.000 30.0 178.460 4.120 -999.990 -999.990 1.785 ..P WKT 2010 08 26 22 04 55 31.3200 -97.3300 251.000 122.0 190.965 3.350 -999.990 -999.990 1.910 ..P WKT 2010 08 26 22 09 55 31.3200 -97.3300 251.000 457.0 184.393 3.250 -999.990 -999.990 1.844 ..P WKT 2010 08 26 22 19 55 31.3200 -97.3300 251.000 30.0 181.137 3.470 -999.990 -999.990 1.811 ..P WKT 2010 08 26 22 24 55 31.3200 -97.3300 251.000 122.0 184.863 3.460 -999.990 -999.990 1.849 ..P WKT 2010 08 26 22 29 55 31.3200 -97.3300 251.000 457.0 190.361 3.920 -999.990 -999.990 1.904 ..P WKT 2010 08 26 22 34 55 31.3200 -97.3300 251.000 30.0 186.864 3.920 -999.990 -999.990 1.869 ..P WKT 2010 08 26 22 39 55 31.3200 -97.3300 251.000 122.0 192.498 4.950 -999.990 -999.990 1.925 ..P WKT 2010 08 26 22 44 55 31.3200 -97.3300 251.000 457.0 183.004 3.830 -999.990 -999.990 1.830 ..P WKT 2010 08 26 22 54 55 31.3200 -97.3300 251.000 30.0 174.745 3.590 -999.990 -999.990 1.747 ..P WKT 2010 08 26 22 59 55 31.3200 -97.3300 251.000 122.0 187.291 3.880 -999.990 -999.990 1.873 ..P WKT 2010 08 26 23 04 55 31.3200 -97.3300 251.000 457.0 184.027 4.700 -999.990 -999.990 1.840 ..P WKT 2010 08 26 23 09 55 31.3200 -97.3300 251.000 30.0 183.081 3.370 -999.990 -999.990 1.831 ..P WKT 2010 08 26 23 14 55 31.3200 -97.3300 251.000 122.0 183.770 4.020 -999.990 -999.990 1.838 ..P WKT 2010 08 26 23 19 55 31.3200 -97.3300 251.000 457.0 182.687 3.360 -999.990 -999.990 1.827 ..P WKT 2010 08 26 23 29 55 31.3200 -97.3300 251.000 30.0 176.928 3.090 -999.990 -999.990 1.769 ..P WKT 2010 08 26 23 34 55 31.3200 -97.3300 251.000 122.0 186.565 2.810 -999.990 -999.990 1.866 ..P WKT 2010 08 26 23 39 55 31.3200 -97.3300 251.000 457.0 179.572 2.950 -999.990 -999.990 1.796 ..P WKT 2010 08 26 23 44 55 31.3200 -97.3300 251.000 30.0 190.844 3.550 -999.990 -999.990 1.908 ..P WKT 2010 08 26 23 49 55 31.3200 -97.3300 251.000 122.0 190.121 3.350 -999.990 -999.990 1.901 ..P WKT 2010 08 27 00 09 55 31.3200 -97.3300 251.000 457.0 192.905 2.470 -999.990 -999.990 1.929 ..P WKT 2010 08 27 00 10 25 31.3200 -97.3300 251.000 457.0 189.590 2.660 -999.990 -999.990 1.896 ..P WKT 2010 08 27 00 10 55 31.3200 -97.3300 251.000 457.0 192.818 3.180 -999.990 -999.990 1.928 ..P WKT 2010 08 27 00 11 25 31.3200 -97.3300 251.000 457.0 193.866 4.080 -999.990 -999.990 1.939 ..P WKT 2010 08 27 00 11 55 31.3200 -97.3300 251.000 457.0 194.095 3.030 -999.990 -999.990 1.941 ..P WKT 2010 08 27 00 12 25 31.3200 -97.3300 251.000 457.0 193.234 2.590 -999.990 -999.990 1.932 ..P WKT 2010 08 27 00 12 55 31.3200 -97.3300 251.000 457.0 192.100 3.050 -999.990 -999.990 1.921 ..P WKT 2010 08 27 00 13 25 31.3200 -97.3300 251.000 457.0 186.331 3.060 -999.990 -999.990 1.863 ..P WKT 2010 08 27 00 13 55 31.3200 -97.3300 251.000 457.0 194.739 3.590 -999.990 -999.990 1.947 ..P WKT 2010 08 27 00 14 25 31.3200 -97.3300 251.000 457.0 197.422 2.920 -999.990 -999.990 1.974 ..P WKT 2010 08 27 00 14 55 31.3200 -97.3300 251.000 457.0 195.743 2.960 -999.990 -999.990 1.957 ..P WKT 2010 08 27 00 19 55 31.3200 -97.3300 251.000 30.0 191.763 3.630 -999.990 -999.990 1.918 ..P WKT 2010 08 27 00 24 55 31.3200 -97.3300 251.000 122.0 193.782 3.470 -999.990 -999.990 1.938 ..P WKT 2010 08 27 00 29 55 31.3200 -97.3300 251.000 457.0 189.803 3.110 -999.990 -999.990 1.898 ..P WKT 2010 08 27 00 34 55 31.3200 -97.3300 251.000 30.0 187.459 2.660 -999.990 -999.990 1.875 ..P WKT 2010 08 27 00 39 55 31.3200 -97.3300 251.000 122.0 184.570 2.600 -999.990 -999.990 1.846 ..P WKT 2010 08 27 00 44 55 31.3200 -97.3300 251.000 457.0 188.225 2.260 -999.990 -999.990 1.882 ..P WKT 2010 08 27 00 54 55 31.3200 -97.3300 251.000 30.0 175.684 3.090 -999.990 -999.990 1.757 ..P WKT 2010 08 27 00 59 55 31.3200 -97.3300 251.000 122.0 179.121 2.820 -999.990 -999.990 1.791 ..P WKT 2010 08 27 01 04 55 31.3200 -97.3300 251.000 457.0 179.285 3.210 -999.990 -999.990 1.793 ..P WKT 2010 08 27 01 09 55 31.3200 -97.3300 251.000 30.0 176.178 3.270 -999.990 -999.990 1.762 ..P WKT 2010 08 27 01 14 55 31.3200 -97.3300 251.000 122.0 190.250 3.370 -999.990 -999.990 1.903 ..P WKT 2010 08 27 01 19 55 31.3200 -97.3300 251.000 457.0 181.006 3.270 -999.990 -999.990 1.810 ..P WKT 2010 08 27 01 29 55 31.3200 -97.3300 251.000 30.0 180.380 3.640 -999.990 -999.990 1.804 ..P WKT 2010 08 27 01 34 55 31.3200 -97.3300 251.000 122.0 185.999 4.740 -999.990 -999.990 1.860 ..P WKT 2010 08 27 01 39 55 31.3200 -97.3300 251.000 457.0 181.255 3.790 -999.990 -999.990 1.813 ..P WKT 2010 08 27 01 44 55 31.3200 -97.3300 251.000 30.0 190.010 3.050 -999.990 -999.990 1.900 ..P WKT 2010 08 27 01 49 55 31.3200 -97.3300 251.000 122.0 177.356 3.810 -999.990 -999.990 1.774 ..P WKT 2010 08 27 01 54 55 31.3200 -97.3300 251.000 457.0 167.839 2.940 -999.990 -999.990 1.678 ..P WKT 2010 08 27 02 04 55 31.3200 -97.3300 251.000 30.0 182.018 2.240 -999.990 -999.990 1.820 ..P WKT 2010 08 27 02 09 55 31.3200 -97.3300 251.000 122.0 177.488 3.770 -999.990 -999.990 1.775 ..P WKT 2010 08 27 02 14 55 31.3200 -97.3300 251.000 457.0 174.321 3.300 -999.990 -999.990 1.743 ..P WKT 2010 08 27 02 19 55 31.3200 -97.3300 251.000 30.0 184.382 3.390 -999.990 -999.990 1.844 ..P WKT 2010 08 27 02 24 55 31.3200 -97.3300 251.000 122.0 178.624 3.310 -999.990 -999.990 1.786 ..P WKT 2010 08 27 02 29 55 31.3200 -97.3300 251.000 457.0 175.457 4.220 -999.990 -999.990 1.755 ..P WKT 2010 08 27 02 39 55 31.3200 -97.3300 251.000 30.0 180.987 3.420 -999.990 -999.990 1.810 ..P WKT 2010 08 27 02 44 55 31.3200 -97.3300 251.000 122.0 184.230 3.660 -999.990 -999.990 1.842 ..P WKT 2010 08 27 02 49 55 31.3200 -97.3300 251.000 457.0 176.426 3.380 -999.990 -999.990 1.764 ..P WKT 2010 08 27 02 54 55 31.3200 -97.3300 251.000 30.0 181.033 4.320 -999.990 -999.990 1.810 ..P WKT 2010 08 27 02 59 55 31.3200 -97.3300 251.000 122.0 177.729 2.990 -999.990 -999.990 1.777 ..P WKT 2010 08 27 03 04 55 31.3200 -97.3300 251.000 457.0 170.060 4.010 -999.990 -999.990 1.701 ..P WKT 2010 08 27 03 14 55 31.3200 -97.3300 251.000 30.0 186.114 3.040 -999.990 -999.990 1.861 ..P WKT 2010 08 27 03 19 55 31.3200 -97.3300 251.000 122.0 167.280 2.870 -999.990 -999.990 1.673 ..P WKT 2010 08 27 03 24 55 31.3200 -97.3300 251.000 457.0 161.540 2.390 -999.990 -999.990 1.615 ..P WKT 2010 08 27 03 29 55 31.3200 -97.3300 251.000 30.0 185.536 3.000 -999.990 -999.990 1.855 ..P WKT 2010 08 27 03 34 55 31.3200 -97.3300 251.000 122.0 176.249 2.730 -999.990 -999.990 1.762 ..P WKT 2010 08 27 03 39 55 31.3200 -97.3300 251.000 457.0 175.693 3.590 -999.990 -999.990 1.757 ..P WKT 2010 08 27 03 49 55 31.3200 -97.3300 251.000 30.0 173.840 3.380 -999.990 -999.990 1.738 ..P WKT 2010 08 27 03 54 55 31.3200 -97.3300 251.000 122.0 174.179 2.930 -999.990 -999.990 1.742 ..P WKT 2010 08 27 03 59 55 31.3200 -97.3300 251.000 457.0 168.244 2.920 -999.990 -999.990 1.682 ..P WKT 2010 08 27 04 04 55 31.3200 -97.3300 251.000 30.0 176.223 2.890 -999.990 -999.990 1.762 ..P WKT 2010 08 27 04 09 55 31.3200 -97.3300 251.000 122.0 168.923 3.360 -999.990 -999.990 1.689 ..P WKT 2010 08 27 04 14 55 31.3200 -97.3300 251.000 457.0 173.901 3.040 -999.990 -999.990 1.739 ..P WKT 2010 08 27 04 24 55 31.3200 -97.3300 251.000 30.0 179.999 2.600 -999.990 -999.990 1.800 ..P WKT 2010 08 27 04 29 55 31.3200 -97.3300 251.000 122.0 173.479 2.580 -999.990 -999.990 1.735 ..P WKT 2010 08 27 04 34 55 31.3200 -97.3300 251.000 457.0 171.597 2.670 -999.990 -999.990 1.716 ..P WKT 2010 08 27 04 39 55 31.3200 -97.3300 251.000 30.0 177.355 5.010 -999.990 -999.990 1.774 ..P WKT 2010 08 27 04 44 55 31.3200 -97.3300 251.000 122.0 173.290 3.040 -999.990 -999.990 1.733 ..P WKT 2010 08 27 04 49 55 31.3200 -97.3300 251.000 457.0 166.769 2.800 -999.990 -999.990 1.668 ..P WKT 2010 08 27 05 04 55 31.3200 -97.3300 251.000 30.0 173.392 2.690 -999.990 -999.990 1.734 ..P WKT 2010 08 27 05 09 55 31.3200 -97.3300 251.000 122.0 176.553 2.690 -999.990 -999.990 1.766 ..P WKT 2010 08 27 05 14 55 31.3200 -97.3300 251.000 457.0 161.704 2.700 -999.990 -999.990 1.617 ..P WKT 2010 08 27 05 19 55 31.3200 -97.3300 251.000 30.0 176.599 2.960 -999.990 -999.990 1.766 ..P WKT 2010 08 27 05 24 55 31.3200 -97.3300 251.000 122.0 176.760 2.660 -999.990 -999.990 1.768 ..P WKT 2010 08 27 05 29 55 31.3200 -97.3300 251.000 457.0 167.231 2.860 -999.990 -999.990 1.672 ..P WKT 2010 08 27 05 39 55 31.3200 -97.3300 251.000 30.0 178.919 3.530 -999.990 -999.990 1.789 ..P WKT 2010 08 27 05 44 55 31.3200 -97.3300 251.000 122.0 179.668 3.790 -999.990 -999.990 1.797 ..P WKT 2010 08 27 05 49 55 31.3200 -97.3300 251.000 457.0 168.000 3.680 -999.990 -999.990 1.680 ..P WKT 2010 08 27 05 54 55 31.3200 -97.3300 251.000 30.0 176.391 4.900 -999.990 -999.990 1.764 ..P WKT 2010 08 27 05 59 55 31.3200 -97.3300 251.000 122.0 179.324 4.940 -999.990 -999.990 1.793 ..P WKT 2010 08 27 06 04 55 31.3200 -97.3300 251.000 457.0 168.474 5.490 -999.990 -999.990 1.685 ..P WKT 2010 08 27 06 14 55 31.3200 -97.3300 251.000 30.0 177.868 5.860 -999.990 -999.990 1.779 ..P WKT 2010 08 27 06 19 55 31.3200 -97.3300 251.000 122.0 188.832 4.830 -999.990 -999.990 1.888 ..P WKT 2010 08 27 06 24 55 31.3200 -97.3300 251.000 457.0 169.501 4.530 -999.990 -999.990 1.695 ..P WKT 2010 08 27 06 29 55 31.3200 -97.3300 251.000 30.0 178.829 4.260 -999.990 -999.990 1.788 ..P WKT 2010 08 27 06 34 55 31.3200 -97.3300 251.000 122.0 183.790 3.660 -999.990 -999.990 1.838 ..P WKT 2010 08 27 06 39 55 31.3200 -97.3300 251.000 457.0 177.832 3.540 -999.990 -999.990 1.778 ..P WKT 2010 08 27 06 49 55 31.3200 -97.3300 251.000 30.0 175.724 3.390 -999.990 -999.990 1.757 ..P WKT 2010 08 27 06 54 55 31.3200 -97.3300 251.000 122.0 179.711 4.210 -999.990 -999.990 1.797 ..P WKT 2010 08 27 06 59 55 31.3200 -97.3300 251.000 457.0 177.145 3.320 -999.990 -999.990 1.771 ..P WKT 2010 08 27 07 04 55 31.3200 -97.3300 251.000 30.0 174.171 3.310 -999.990 -999.990 1.742 ..P WKT 2010 08 27 07 09 55 31.3200 -97.3300 251.000 122.0 185.937 3.180 -999.990 -999.990 1.859 ..P WKT 2010 08 27 07 14 55 31.3200 -97.3300 251.000 457.0 181.324 2.770 -999.990 -999.990 1.813 ..P WKT 2010 08 27 07 24 55 31.3200 -97.3300 251.000 30.0 180.971 3.850 -999.990 -999.990 1.810 ..P WKT 2010 08 27 07 29 55 31.3200 -97.3300 251.000 122.0 190.826 2.930 -999.990 -999.990 1.908 ..P WKT 2010 08 27 07 34 55 31.3200 -97.3300 251.000 457.0 183.757 3.080 -999.990 -999.990 1.838 ..P WKT 2010 08 27 07 39 55 31.3200 -97.3300 251.000 30.0 186.241 2.730 -999.990 -999.990 1.862 ..P WKT 2010 08 27 07 44 55 31.3200 -97.3300 251.000 122.0 185.724 4.780 -999.990 -999.990 1.857 ..P WKT 2010 08 27 07 49 55 31.3200 -97.3300 251.000 457.0 180.019 3.660 -999.990 -999.990 1.800 ..P WKT 2010 08 27 07 59 55 31.3200 -97.3300 251.000 30.0 175.512 3.890 -999.990 -999.990 1.755 ..P WKT 2010 08 27 08 04 55 31.3200 -97.3300 251.000 122.0 181.897 3.050 -999.990 -999.990 1.819 ..P WKT 2010 08 27 08 09 55 31.3200 -97.3300 251.000 457.0 188.282 2.740 -999.990 -999.990 1.883 ..P WKT 2010 08 27 08 14 55 31.3200 -97.3300 251.000 30.0 178.833 3.550 -999.990 -999.990 1.788 ..P WKT 2010 08 27 08 19 55 31.3200 -97.3300 251.000 122.0 190.952 2.800 -999.990 -999.990 1.910 ..P WKT 2010 08 27 08 24 55 31.3200 -97.3300 251.000 457.0 186.690 2.810 -999.990 -999.990 1.867 ..P WKT 2010 08 27 08 34 55 31.3200 -97.3300 251.000 30.0 186.513 2.810 -999.990 -999.990 1.865 ..P WKT 2010 08 27 08 39 55 31.3200 -97.3300 251.000 122.0 202.338 3.430 -999.990 -999.990 2.023 ..P WKT 2010 08 27 08 44 55 31.3200 -97.3300 251.000 457.0 188.402 2.950 -999.990 -999.990 1.884 ..P WKT 2010 08 27 08 49 55 31.3200 -97.3300 251.000 30.0 178.015 2.500 -999.990 -999.990 1.780 ..P WKT 2010 08 27 08 54 55 31.3200 -97.3300 251.000 122.0 206.947 4.720 -999.990 -999.990 2.069 ..P WKT 2010 08 27 08 59 55 31.3200 -97.3300 251.000 457.0 244.070 4.960 -999.990 -999.990 2.441 ..P WKT 2010 08 27 09 09 55 31.3200 -97.3300 251.000 30.0 185.091 2.870 -999.990 -999.990 1.851 ..P WKT 2010 08 27 09 14 55 31.3200 -97.3300 251.000 122.0 221.552 3.300 -999.990 -999.990 2.216 ..P WKT 2010 08 27 09 19 55 31.3200 -97.3300 251.000 457.0 207.362 5.040 -999.990 -999.990 2.074 ..P WKT 2010 08 27 09 24 55 31.3200 -97.3300 251.000 30.0 180.202 5.280 -999.990 -999.990 1.802 ..P WKT 2010 08 27 09 29 55 31.3200 -97.3300 251.000 122.0 221.716 3.930 -999.990 -999.990 2.217 ..P WKT 2010 08 27 09 34 55 31.3200 -97.3300 251.000 457.0 219.268 4.540 -999.990 -999.990 2.193 ..P WKT 2010 08 27 09 44 55 31.3200 -97.3300 251.000 30.0 185.054 3.990 -999.990 -999.990 1.851 ..P WKT 2010 08 27 09 49 55 31.3200 -97.3300 251.000 122.0 199.847 3.870 -999.990 -999.990 1.998 ..P WKT 2010 08 27 09 54 55 31.3200 -97.3300 251.000 457.0 192.385 4.390 -999.990 -999.990 1.924 ..P WKT 2010 08 27 09 59 55 31.3200 -97.3300 251.000 30.0 180.827 6.210 -999.990 -999.990 1.808 ..P WKT 2010 08 27 10 04 55 31.3200 -97.3300 251.000 122.0 176.096 4.690 -999.990 -999.990 1.761 ..P WKT 2010 08 27 10 09 55 31.3200 -97.3300 251.000 457.0 198.264 3.900 -999.990 -999.990 1.983 ..P WKT 2010 08 27 10 19 55 31.3200 -97.3300 251.000 30.0 181.603 3.450 -999.990 -999.990 1.816 ..P WKT 2010 08 27 10 24 55 31.3200 -97.3300 251.000 122.0 187.698 4.800 -999.990 -999.990 1.877 ..P WKT 2010 08 27 10 29 55 31.3200 -97.3300 251.000 457.0 210.316 5.690 -999.990 -999.990 2.103 ..P WKT 2010 08 27 10 34 55 31.3200 -97.3300 251.000 30.0 179.542 5.830 -999.990 -999.990 1.795 ..P WKT 2010 08 27 10 39 55 31.3200 -97.3300 251.000 122.0 179.902 6.610 -999.990 -999.990 1.799 ..P WKT 2010 08 27 10 44 55 31.3200 -97.3300 251.000 457.0 204.295 4.040 -999.990 -999.990 2.043 ..P WKT 2010 08 27 10 54 55 31.3200 -97.3300 251.000 30.0 188.687 3.450 -999.990 -999.990 1.887 ..P WKT 2010 08 27 10 59 55 31.3200 -97.3300 251.000 122.0 179.682 4.480 -999.990 -999.990 1.797 ..P WKT 2010 08 27 11 04 55 31.3200 -97.3300 251.000 457.0 188.703 5.730 -999.990 -999.990 1.887 ..P WKT 2010 08 27 11 09 55 31.3200 -97.3300 251.000 30.0 188.166 4.080 -999.990 -999.990 1.882 ..P WKT 2010 08 27 11 14 55 31.3200 -97.3300 251.000 122.0 182.029 3.970 -999.990 -999.990 1.820 ..P WKT 2010 08 27 11 19 55 31.3200 -97.3300 251.000 457.0 191.871 3.410 -999.990 -999.990 1.919 ..P WKT 2010 08 27 11 29 55 31.3200 -97.3300 251.000 30.0 189.035 4.130 -999.990 -999.990 1.890 ..P WKT 2010 08 27 11 34 55 31.3200 -97.3300 251.000 122.0 189.467 3.870 -999.990 -999.990 1.895 ..P WKT 2010 08 27 11 39 55 31.3200 -97.3300 251.000 457.0 194.544 4.020 -999.990 -999.990 1.945 ..P WKT 2010 08 27 11 44 55 31.3200 -97.3300 251.000 30.0 186.509 4.300 -999.990 -999.990 1.865 ..P WKT 2010 08 27 11 49 55 31.3200 -97.3300 251.000 122.0 187.216 3.830 -999.990 -999.990 1.872 ..P WKT 2010 08 27 12 09 55 31.3200 -97.3300 251.000 457.0 178.287 3.110 -999.990 -999.990 1.783 ..P WKT 2010 08 27 12 10 25 31.3200 -97.3300 251.000 457.0 177.943 2.750 -999.990 -999.990 1.779 ..P WKT 2010 08 27 12 10 55 31.3200 -97.3300 251.000 457.0 181.697 2.850 -999.990 -999.990 1.817 ..P WKT 2010 08 27 12 11 25 31.3200 -97.3300 251.000 457.0 176.708 2.790 -999.990 -999.990 1.767 ..P WKT 2010 08 27 12 11 55 31.3200 -97.3300 251.000 457.0 178.549 4.530 -999.990 -999.990 1.785 ..P WKT 2010 08 27 12 12 25 31.3200 -97.3300 251.000 457.0 170.829 3.800 -999.990 -999.990 1.708 ..P WKT 2010 08 27 12 12 55 31.3200 -97.3300 251.000 457.0 180.046 3.240 -999.990 -999.990 1.800 ..P WKT 2010 08 27 12 13 25 31.3200 -97.3300 251.000 457.0 185.712 3.320 -999.990 -999.990 1.857 ..P WKT 2010 08 27 12 13 55 31.3200 -97.3300 251.000 457.0 179.084 3.530 -999.990 -999.990 1.791 ..P WKT 2010 08 27 12 14 25 31.3200 -97.3300 251.000 457.0 182.564 4.020 -999.990 -999.990 1.826 ..P WKT 2010 08 27 12 14 55 31.3200 -97.3300 251.000 457.0 177.849 4.150 -999.990 -999.990 1.778 ..P WKT 2010 08 27 12 19 55 31.3200 -97.3300 251.000 30.0 184.514 4.160 -999.990 -999.990 1.845 ..P WKT 2010 08 27 12 24 55 31.3200 -97.3300 251.000 122.0 186.261 4.720 -999.990 -999.990 1.863 ..P WKT 2010 08 27 12 29 55 31.3200 -97.3300 251.000 457.0 180.904 5.170 -999.990 -999.990 1.809 ..P WKT 2010 08 27 12 34 55 31.3200 -97.3300 251.000 30.0 191.121 3.460 -999.990 -999.990 1.911 ..P WKT 2010 08 27 12 39 55 31.3200 -97.3300 251.000 122.0 189.590 3.670 -999.990 -999.990 1.896 ..P WKT 2010 08 27 12 44 55 31.3200 -97.3300 251.000 457.0 173.577 3.680 -999.990 -999.990 1.736 ..P WKT 2010 08 27 12 54 55 31.3200 -97.3300 251.000 30.0 195.133 3.070 -999.990 -999.990 1.951 ..P WKT 2010 08 27 12 59 55 31.3200 -97.3300 251.000 122.0 178.324 3.490 -999.990 -999.990 1.783 ..P WKT 2010 08 27 13 04 55 31.3200 -97.3300 251.000 457.0 173.265 3.920 -999.990 -999.990 1.733 ..P WKT 2010 08 27 13 09 55 31.3200 -97.3300 251.000 30.0 191.984 3.180 -999.990 -999.990 1.920 ..P WKT 2010 08 27 13 14 55 31.3200 -97.3300 251.000 122.0 178.042 3.000 -999.990 -999.990 1.780 ..P WKT 2010 08 27 13 19 55 31.3200 -97.3300 251.000 457.0 182.276 2.720 -999.990 -999.990 1.823 ..P WKT 2010 08 27 13 29 55 31.3200 -97.3300 251.000 30.0 201.269 3.270 -999.990 -999.990 2.013 ..P WKT 2010 08 27 13 34 55 31.3200 -97.3300 251.000 122.0 189.375 3.490 -999.990 -999.990 1.894 ..P WKT 2010 08 27 13 39 55 31.3200 -97.3300 251.000 457.0 187.322 5.520 -999.990 -999.990 1.873 ..P WKT 2010 08 27 13 44 55 31.3200 -97.3300 251.000 30.0 199.759 4.050 -999.990 -999.990 1.998 ..P WKT 2010 08 27 13 49 55 31.3200 -97.3300 251.000 122.0 188.137 5.270 -999.990 -999.990 1.881 ..P WKT 2010 08 27 13 54 55 31.3200 -97.3300 251.000 457.0 189.228 2.830 -999.990 -999.990 1.892 ..P WKT 2010 08 27 14 04 55 31.3200 -97.3300 251.000 30.0 193.032 3.710 -999.990 -999.990 1.930 ..P WKT 2010 08 27 14 09 55 31.3200 -97.3300 251.000 122.0 195.882 3.460 -999.990 -999.990 1.959 ..P WKT 2010 08 27 14 14 55 31.3200 -97.3300 251.000 457.0 197.501 4.490 -999.990 -999.990 1.975 ..P WKT 2010 08 27 14 19 55 31.3200 -97.3300 251.000 30.0 200.761 4.360 -999.990 -999.990 2.008 ..P WKT 2010 08 27 14 24 55 31.3200 -97.3300 251.000 122.0 204.978 3.390 -999.990 -999.990 2.050 ..P WKT 2010 08 27 14 29 55 31.3200 -97.3300 251.000 457.0 189.094 2.700 -999.990 -999.990 1.891 ..P WKT 2010 08 27 14 39 55 31.3200 -97.3300 251.000 30.0 191.531 3.830 -999.990 -999.990 1.915 ..P WKT 2010 08 27 14 44 55 31.3200 -97.3300 251.000 122.0 201.787 3.310 -999.990 -999.990 2.018 ..P WKT 2010 08 27 14 49 55 31.3200 -97.3300 251.000 457.0 188.518 3.740 -999.990 -999.990 1.885 ..P WKT 2010 08 27 14 54 55 31.3200 -97.3300 251.000 30.0 193.576 5.370 -999.990 -999.990 1.936 ..P WKT 2010 08 27 14 59 55 31.3200 -97.3300 251.000 122.0 196.172 3.640 -999.990 -999.990 1.962 ..P WKT 2010 08 27 15 04 55 31.3200 -97.3300 251.000 457.0 181.944 2.310 -999.990 -999.990 1.819 ..P WKT 2010 08 27 15 14 55 31.3200 -97.3300 251.000 30.0 195.345 2.510 -999.990 -999.990 1.953 ..P WKT 2010 08 27 15 19 55 31.3200 -97.3300 251.000 122.0 200.405 3.260 -999.990 -999.990 2.004 ..P WKT 2010 08 27 15 24 55 31.3200 -97.3300 251.000 457.0 194.520 2.680 -999.990 -999.990 1.945 ..P WKT 2010 08 27 15 29 55 31.3200 -97.3300 251.000 30.0 190.277 2.530 -999.990 -999.990 1.903 ..P WKT 2010 08 27 15 34 55 31.3200 -97.3300 251.000 122.0 199.988 3.750 -999.990 -999.990 2.000 ..P WKT 2010 08 27 15 39 55 31.3200 -97.3300 251.000 457.0 196.839 3.310 -999.990 -999.990 1.968 ..P WKT 2010 08 27 15 49 55 31.3200 -97.3300 251.000 30.0 195.350 2.720 -999.990 -999.990 1.954 ..P WKT 2010 08 27 15 54 55 31.3200 -97.3300 251.000 122.0 206.589 2.620 -999.990 -999.990 2.066 ..P WKT 2010 08 27 15 59 55 31.3200 -97.3300 251.000 457.0 200.858 2.790 -999.990 -999.990 2.009 ..P WKT 2010 08 27 16 04 55 31.3200 -97.3300 251.000 30.0 199.781 2.770 -999.990 -999.990 1.998 ..P WKT 2010 08 27 16 09 55 31.3200 -97.3300 251.000 122.0 197.062 2.820 -999.990 -999.990 1.971 ..P WKT 2010 08 27 16 14 55 31.3200 -97.3300 251.000 457.0 195.711 5.010 -999.990 -999.990 1.957 ..P WKT 2010 08 27 16 24 55 31.3200 -97.3300 251.000 30.0 192.343 2.770 -999.990 -999.990 1.923 ..P WKT 2010 08 27 16 29 55 31.3200 -97.3300 251.000 122.0 196.623 3.620 -999.990 -999.990 1.966 ..P WKT 2010 08 27 16 34 55 31.3200 -97.3300 251.000 457.0 195.976 2.770 -999.990 -999.990 1.960 ..P WKT 2010 08 27 16 39 55 31.3200 -97.3300 251.000 30.0 193.959 3.820 -999.990 -999.990 1.940 ..P WKT 2010 08 27 16 44 55 31.3200 -97.3300 251.000 122.0 196.597 3.610 -999.990 -999.990 1.966 ..P WKT 2010 08 27 16 49 55 31.3200 -97.3300 251.000 457.0 193.758 2.600 -999.990 -999.990 1.938 ..P WKT 2010 08 27 17 04 55 31.3200 -97.3300 251.000 30.0 195.336 2.980 -999.990 -999.990 1.953 ..P WKT 2010 08 27 17 09 55 31.3200 -97.3300 251.000 122.0 199.872 4.290 -999.990 -999.990 1.999 ..P WKT 2010 08 27 17 14 55 31.3200 -97.3300 251.000 457.0 193.180 4.560 -999.990 -999.990 1.932 ..P WKT 2010 08 27 17 19 55 31.3200 -97.3300 251.000 30.0 188.267 3.970 -999.990 -999.990 1.883 ..P WKT 2010 08 27 17 24 55 31.3200 -97.3300 251.000 122.0 203.622 4.610 -999.990 -999.990 2.036 ..P WKT 2010 08 27 17 29 55 31.3200 -97.3300 251.000 457.0 197.204 4.890 -999.990 -999.990 1.972 ..P WKT 2010 08 27 17 39 55 31.3200 -97.3300 251.000 30.0 188.727 4.020 -999.990 -999.990 1.887 ..P WKT 2010 08 27 17 44 55 31.3200 -97.3300 251.000 122.0 192.560 3.880 -999.990 -999.990 1.926 ..P WKT 2010 08 27 17 49 55 31.3200 -97.3300 251.000 457.0 191.873 6.840 -999.990 -999.990 1.919 ..P WKT 2010 08 27 17 54 55 31.3200 -97.3300 251.000 30.0 187.487 3.740 -999.990 -999.990 1.875 ..P WKT 2010 08 27 17 59 55 31.3200 -97.3300 251.000 122.0 194.881 3.340 -999.990 -999.990 1.949 ..P WKT 2010 08 27 18 04 55 31.3200 -97.3300 251.000 457.0 186.934 2.970 -999.990 -999.990 1.869 ..P WKT 2010 08 27 18 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 08 27 18 19 55 31.3200 -97.3300 251.000 122.0 191.839 3.310 -999.990 -999.990 1.918 ..P WKT 2010 08 27 18 24 55 31.3200 -97.3300 251.000 457.0 180.523 5.050 -999.990 -999.990 1.805 ..P WKT 2010 08 27 18 29 55 31.3200 -97.3300 251.000 30.0 184.689 6.910 -999.990 -999.990 1.847 ..P WKT 2010 08 27 18 34 55 31.3200 -97.3300 251.000 122.0 191.734 5.660 -999.990 -999.990 1.917 ..P WKT 2010 08 27 18 39 55 31.3200 -97.3300 251.000 457.0 190.968 4.070 -999.990 -999.990 1.910 ..P WKT 2010 08 27 18 49 55 31.3200 -97.3300 251.000 30.0 182.604 3.910 -999.990 -999.990 1.826 ..P WKT 2010 08 27 18 54 55 31.3200 -97.3300 251.000 122.0 188.846 6.150 -999.990 -999.990 1.888 ..P WKT 2010 08 27 18 59 55 31.3200 -97.3300 251.000 457.0 189.196 6.790 -999.990 -999.990 1.892 ..P WKT 2010 08 27 19 04 55 31.3200 -97.3300 251.000 30.0 191.054 5.150 -999.990 -999.990 1.911 ..P WKT 2010 08 27 19 09 55 31.3200 -97.3300 251.000 122.0 197.297 5.020 -999.990 -999.990 1.973 ..P WKT 2010 08 27 19 14 55 31.3200 -97.3300 251.000 457.0 195.866 2.950 -999.990 -999.990 1.959 ..P WKT 2010 08 27 19 24 55 31.3200 -97.3300 251.000 30.0 183.211 3.200 -999.990 -999.990 1.832 ..P WKT 2010 08 27 19 29 55 31.3200 -97.3300 251.000 122.0 189.808 3.600 -999.990 -999.990 1.898 ..P WKT 2010 08 27 19 34 55 31.3200 -97.3300 251.000 457.0 174.470 4.490 -999.990 -999.990 1.745 ..P WKT 2010 08 27 19 39 55 31.3200 -97.3300 251.000 30.0 177.503 3.490 -999.990 -999.990 1.775 ..P WKT 2010 08 27 19 44 55 31.3200 -97.3300 251.000 122.0 178.068 2.560 -999.990 -999.990 1.781 ..P WKT 2010 08 27 19 49 55 31.3200 -97.3300 251.000 457.0 174.794 2.960 -999.990 -999.990 1.748 ..P WKT 2010 08 27 19 59 55 31.3200 -97.3300 251.000 30.0 174.945 2.560 -999.990 -999.990 1.749 ..P WKT 2010 08 27 20 04 55 31.3200 -97.3300 251.000 122.0 187.969 2.390 -999.990 -999.990 1.880 ..P WKT 2010 08 27 20 09 55 31.3200 -97.3300 251.000 457.0 180.698 2.880 -999.990 -999.990 1.807 ..P WKT 2010 08 27 20 14 55 31.3200 -97.3300 251.000 30.0 190.158 2.420 -999.990 -999.990 1.902 ..P WKT 2010 08 27 20 19 55 31.3200 -97.3300 251.000 122.0 193.584 2.540 -999.990 -999.990 1.936 ..P WKT 2010 08 27 20 24 55 31.3200 -97.3300 251.000 457.0 185.216 2.330 -999.990 -999.990 1.852 ..P WKT 2010 08 27 20 34 55 31.3200 -97.3300 251.000 30.0 188.463 3.380 -999.990 -999.990 1.885 ..P WKT 2010 08 27 20 39 55 31.3200 -97.3300 251.000 122.0 199.807 3.630 -999.990 -999.990 1.998 ..P WKT 2010 08 27 20 44 55 31.3200 -97.3300 251.000 457.0 184.814 3.580 -999.990 -999.990 1.848 ..P WKT 2010 08 27 20 49 55 31.3200 -97.3300 251.000 30.0 186.829 3.250 -999.990 -999.990 1.868 ..P WKT 2010 08 27 20 54 55 31.3200 -97.3300 251.000 122.0 197.076 3.420 -999.990 -999.990 1.971 ..P WKT 2010 08 27 20 59 55 31.3200 -97.3300 251.000 457.0 187.294 3.060 -999.990 -999.990 1.873 ..P WKT 2010 08 27 21 09 55 31.3200 -97.3300 251.000 30.0 190.543 3.930 -999.990 -999.990 1.905 ..P WKT 2010 08 27 21 14 55 31.3200 -97.3300 251.000 122.0 202.066 3.370 -999.990 -999.990 2.021 ..P WKT 2010 08 27 21 19 55 31.3200 -97.3300 251.000 457.0 188.068 2.880 -999.990 -999.990 1.881 ..P WKT 2010 08 27 21 24 55 31.3200 -97.3300 251.000 30.0 188.752 2.970 -999.990 -999.990 1.888 ..P WKT 2010 08 27 21 29 55 31.3200 -97.3300 251.000 122.0 194.238 3.590 -999.990 -999.990 1.942 ..P WKT 2010 08 27 21 34 55 31.3200 -97.3300 251.000 457.0 186.551 2.960 -999.990 -999.990 1.866 ..P WKT 2010 08 27 21 44 55 31.3200 -97.3300 251.000 30.0 186.781 3.150 -999.990 -999.990 1.868 ..P WKT 2010 08 27 21 49 55 31.3200 -97.3300 251.000 122.0 197.994 3.670 -999.990 -999.990 1.980 ..P WKT 2010 08 27 21 54 55 31.3200 -97.3300 251.000 457.0 182.580 2.880 -999.990 -999.990 1.826 ..P WKT 2010 08 27 21 59 55 31.3200 -97.3300 251.000 30.0 186.930 2.910 -999.990 -999.990 1.869 ..P WKT 2010 08 27 22 04 55 31.3200 -97.3300 251.000 122.0 192.653 4.060 -999.990 -999.990 1.927 ..P WKT 2010 08 27 22 09 55 31.3200 -97.3300 251.000 457.0 191.926 3.470 -999.990 -999.990 1.919 ..P WKT 2010 08 27 22 19 55 31.3200 -97.3300 251.000 30.0 174.447 2.450 -999.990 -999.990 1.744 ..P WKT 2010 08 27 22 24 55 31.3200 -97.3300 251.000 122.0 183.779 2.910 -999.990 -999.990 1.838 ..P WKT 2010 08 27 22 29 55 31.3200 -97.3300 251.000 457.0 184.875 3.890 -999.990 -999.990 1.849 ..P WKT 2010 08 27 22 34 55 31.3200 -97.3300 251.000 30.0 182.676 3.650 -999.990 -999.990 1.827 ..P WKT 2010 08 27 22 39 55 31.3200 -97.3300 251.000 122.0 186.381 3.590 -999.990 -999.990 1.864 ..P WKT 2010 08 27 22 44 55 31.3200 -97.3300 251.000 457.0 187.201 2.410 -999.990 -999.990 1.872 ..P WKT 2010 08 27 22 54 55 31.3200 -97.3300 251.000 30.0 184.391 2.490 -999.990 -999.990 1.844 ..P WKT 2010 08 27 22 59 55 31.3200 -97.3300 251.000 122.0 186.939 2.450 -999.990 -999.990 1.869 ..P WKT 2010 08 27 23 04 55 31.3200 -97.3300 251.000 457.0 181.521 3.410 -999.990 -999.990 1.815 ..P WKT 2010 08 27 23 09 55 31.3200 -97.3300 251.000 30.0 176.103 3.080 -999.990 -999.990 1.761 ..P WKT 2010 08 27 23 14 55 31.3200 -97.3300 251.000 122.0 181.123 2.760 -999.990 -999.990 1.811 ..P WKT 2010 08 27 23 19 55 31.3200 -97.3300 251.000 457.0 172.683 3.830 -999.990 -999.990 1.727 ..P WKT 2010 08 27 23 29 55 31.3200 -97.3300 251.000 30.0 181.051 3.240 -999.990 -999.990 1.811 ..P WKT 2010 08 27 23 34 55 31.3200 -97.3300 251.000 122.0 186.047 3.650 -999.990 -999.990 1.860 ..P WKT 2010 08 27 23 39 55 31.3200 -97.3300 251.000 457.0 181.153 2.470 -999.990 -999.990 1.812 ..P WKT 2010 08 27 23 44 55 31.3200 -97.3300 251.000 30.0 175.160 4.350 -999.990 -999.990 1.752 ..P WKT 2010 08 27 23 49 55 31.3200 -97.3300 251.000 122.0 183.728 3.030 -999.990 -999.990 1.837 ..P WKT 2010 08 28 00 09 55 31.3200 -97.3300 251.000 457.0 181.941 2.260 -999.990 -999.990 1.819 ..P WKT 2010 08 28 00 10 25 31.3200 -97.3300 251.000 457.0 176.668 2.600 -999.990 -999.990 1.767 ..P WKT 2010 08 28 00 10 55 31.3200 -97.3300 251.000 457.0 178.816 3.350 -999.990 -999.990 1.788 ..P WKT 2010 08 28 00 11 25 31.3200 -97.3300 251.000 457.0 178.491 2.620 -999.990 -999.990 1.785 ..P WKT 2010 08 28 00 11 55 31.3200 -97.3300 251.000 457.0 176.516 2.020 -999.990 -999.990 1.765 ..P WKT 2010 08 28 00 12 25 31.3200 -97.3300 251.000 457.0 177.565 2.620 -999.990 -999.990 1.776 ..P WKT 2010 08 28 00 12 55 31.3200 -97.3300 251.000 457.0 175.590 2.940 -999.990 -999.990 1.756 ..P WKT 2010 08 28 00 13 25 31.3200 -97.3300 251.000 457.0 184.883 3.140 -999.990 -999.990 1.849 ..P WKT 2010 08 28 00 13 55 31.3200 -97.3300 251.000 457.0 178.237 4.920 -999.990 -999.990 1.782 ..P WKT 2010 08 28 00 14 25 31.3200 -97.3300 251.000 457.0 172.415 3.080 -999.990 -999.990 1.724 ..P WKT 2010 08 28 00 14 55 31.3200 -97.3300 251.000 457.0 173.738 2.610 -999.990 -999.990 1.737 ..P WKT 2010 08 28 00 19 55 31.3200 -97.3300 251.000 30.0 173.505 2.520 -999.990 -999.990 1.735 ..P WKT 2010 08 28 00 24 55 31.3200 -97.3300 251.000 122.0 184.814 2.840 -999.990 -999.990 1.848 ..P WKT 2010 08 28 00 29 55 31.3200 -97.3300 251.000 457.0 177.436 3.270 -999.990 -999.990 1.774 ..P WKT 2010 08 28 00 34 55 31.3200 -97.3300 251.000 30.0 173.630 3.600 -999.990 -999.990 1.736 ..P WKT 2010 08 28 00 39 55 31.3200 -97.3300 251.000 122.0 181.641 2.820 -999.990 -999.990 1.816 ..P WKT 2010 08 28 00 44 55 31.3200 -97.3300 251.000 457.0 178.935 3.530 -999.990 -999.990 1.789 ..P WKT 2010 08 28 00 54 55 31.3200 -97.3300 251.000 30.0 177.269 2.770 -999.990 -999.990 1.773 ..P WKT 2010 08 28 00 59 55 31.3200 -97.3300 251.000 122.0 177.897 2.880 -999.990 -999.990 1.779 ..P WKT 2010 08 28 01 04 55 31.3200 -97.3300 251.000 457.0 179.487 3.600 -999.990 -999.990 1.795 ..P WKT 2010 08 28 01 09 55 31.3200 -97.3300 251.000 30.0 181.353 3.040 -999.990 -999.990 1.814 ..P WKT 2010 08 28 01 14 55 31.3200 -97.3300 251.000 122.0 189.127 3.400 -999.990 -999.990 1.891 ..P WKT 2010 08 28 01 19 55 31.3200 -97.3300 251.000 457.0 185.770 3.480 -999.990 -999.990 1.858 ..P WKT 2010 08 28 01 29 55 31.3200 -97.3300 251.000 30.0 188.087 3.140 -999.990 -999.990 1.881 ..P WKT 2010 08 28 01 34 55 31.3200 -97.3300 251.000 122.0 178.644 4.880 -999.990 -999.990 1.786 ..P WKT 2010 08 28 01 39 55 31.3200 -97.3300 251.000 457.0 182.669 4.050 -999.990 -999.990 1.827 ..P WKT 2010 08 28 01 44 55 31.3200 -97.3300 251.000 30.0 186.557 3.440 -999.990 -999.990 1.866 ..P WKT 2010 08 28 01 49 55 31.3200 -97.3300 251.000 122.0 192.917 2.520 -999.990 -999.990 1.929 ..P WKT 2010 08 28 01 54 55 31.3200 -97.3300 251.000 457.0 181.688 2.970 -999.990 -999.990 1.817 ..P WKT 2010 08 28 02 04 55 31.3200 -97.3300 251.000 30.0 184.928 4.200 -999.990 -999.990 1.849 ..P WKT 2010 08 28 02 09 55 31.3200 -97.3300 251.000 122.0 193.213 3.210 -999.990 -999.990 1.932 ..P WKT 2010 08 28 02 14 55 31.3200 -97.3300 251.000 457.0 186.106 4.520 -999.990 -999.990 1.861 ..P WKT 2010 08 28 02 19 55 31.3200 -97.3300 251.000 30.0 194.941 4.580 -999.990 -999.990 1.949 ..P WKT 2010 08 28 02 24 55 31.3200 -97.3300 251.000 122.0 194.431 3.990 -999.990 -999.990 1.944 ..P WKT 2010 08 28 02 29 55 31.3200 -97.3300 251.000 457.0 196.531 3.870 -999.990 -999.990 1.965 ..P WKT 2010 08 28 02 39 55 31.3200 -97.3300 251.000 30.0 195.334 4.600 -999.990 -999.990 1.953 ..P WKT 2010 08 28 02 44 55 31.3200 -97.3300 251.000 122.0 194.510 3.670 -999.990 -999.990 1.945 ..P WKT 2010 08 28 02 49 55 31.3200 -97.3300 251.000 457.0 196.434 4.320 -999.990 -999.990 1.964 ..P WKT 2010 08 28 02 54 55 31.3200 -97.3300 251.000 30.0 187.777 3.560 -999.990 -999.990 1.878 ..P WKT 2010 08 28 02 59 55 31.3200 -97.3300 251.000 122.0 188.877 3.820 -999.990 -999.990 1.889 ..P WKT 2010 08 28 03 04 55 31.3200 -97.3300 251.000 457.0 185.990 3.100 -999.990 -999.990 1.860 ..P WKT 2010 08 28 03 14 55 31.3200 -97.3300 251.000 30.0 191.999 3.480 -999.990 -999.990 1.920 ..P WKT 2010 08 28 03 19 55 31.3200 -97.3300 251.000 122.0 188.799 3.230 -999.990 -999.990 1.888 ..P WKT 2010 08 28 03 24 55 31.3200 -97.3300 251.000 457.0 193.020 2.690 -999.990 -999.990 1.930 ..P WKT 2010 08 28 03 29 55 31.3200 -97.3300 251.000 30.0 194.768 2.990 -999.990 -999.990 1.948 ..P WKT 2010 08 28 03 34 55 31.3200 -97.3300 251.000 122.0 196.516 2.650 -999.990 -999.990 1.965 ..P WKT 2010 08 28 03 39 55 31.3200 -97.3300 251.000 457.0 196.064 2.770 -999.990 -999.990 1.961 ..P WKT 2010 08 28 03 49 55 31.3200 -97.3300 251.000 30.0 193.355 2.760 -999.990 -999.990 1.934 ..P WKT 2010 08 28 03 54 55 31.3200 -97.3300 251.000 122.0 189.448 3.380 -999.990 -999.990 1.894 ..P WKT 2010 08 28 03 59 55 31.3200 -97.3300 251.000 457.0 192.413 3.150 -999.990 -999.990 1.924 ..P WKT 2010 08 28 04 04 55 31.3200 -97.3300 251.000 30.0 183.833 2.390 -999.990 -999.990 1.838 ..P WKT 2010 08 28 04 09 55 31.3200 -97.3300 251.000 122.0 200.817 4.170 -999.990 -999.990 2.008 ..P WKT 2010 08 28 04 14 55 31.3200 -97.3300 251.000 457.0 192.238 2.610 -999.990 -999.990 1.922 ..P WKT 2010 08 28 04 24 55 31.3200 -97.3300 251.000 30.0 191.511 2.560 -999.990 -999.990 1.915 ..P WKT 2010 08 28 04 29 55 31.3200 -97.3300 251.000 122.0 194.693 3.240 -999.990 -999.990 1.947 ..P WKT 2010 08 28 04 34 55 31.3200 -97.3300 251.000 457.0 196.224 2.880 -999.990 -999.990 1.962 ..P WKT 2010 08 28 04 39 55 31.3200 -97.3300 251.000 30.0 187.860 3.110 -999.990 -999.990 1.879 ..P WKT 2010 08 28 04 44 55 31.3200 -97.3300 251.000 122.0 190.766 4.150 -999.990 -999.990 1.908 ..P WKT 2010 08 28 04 49 55 31.3200 -97.3300 251.000 457.0 193.672 2.740 -999.990 -999.990 1.937 ..P WKT 2010 08 28 05 04 55 31.3200 -97.3300 251.000 30.0 186.437 3.400 -999.990 -999.990 1.864 ..P WKT 2010 08 28 05 09 55 31.3200 -97.3300 251.000 122.0 191.675 3.580 -999.990 -999.990 1.917 ..P WKT 2010 08 28 05 14 55 31.3200 -97.3300 251.000 457.0 189.628 4.230 -999.990 -999.990 1.896 ..P WKT 2010 08 28 05 19 55 31.3200 -97.3300 251.000 30.0 188.132 2.850 -999.990 -999.990 1.881 ..P WKT 2010 08 28 05 24 55 31.3200 -97.3300 251.000 122.0 186.635 3.350 -999.990 -999.990 1.866 ..P WKT 2010 08 28 05 29 55 31.3200 -97.3300 251.000 457.0 185.962 3.110 -999.990 -999.990 1.860 ..P WKT 2010 08 28 05 39 55 31.3200 -97.3300 251.000 30.0 191.750 3.090 -999.990 -999.990 1.917 ..P WKT 2010 08 28 05 44 55 31.3200 -97.3300 251.000 122.0 193.950 3.270 -999.990 -999.990 1.940 ..P WKT 2010 08 28 05 49 55 31.3200 -97.3300 251.000 457.0 188.039 3.640 -999.990 -999.990 1.880 ..P WKT 2010 08 28 05 54 55 31.3200 -97.3300 251.000 30.0 188.177 4.030 -999.990 -999.990 1.882 ..P WKT 2010 08 28 05 59 55 31.3200 -97.3300 251.000 122.0 185.153 4.070 -999.990 -999.990 1.852 ..P WKT 2010 08 28 06 04 55 31.3200 -97.3300 251.000 457.0 178.556 4.200 -999.990 -999.990 1.786 ..P WKT 2010 08 28 06 14 55 31.3200 -97.3300 251.000 30.0 186.489 4.760 -999.990 -999.990 1.865 ..P WKT 2010 08 28 06 19 55 31.3200 -97.3300 251.000 122.0 188.786 3.740 -999.990 -999.990 1.888 ..P WKT 2010 08 28 06 24 55 31.3200 -97.3300 251.000 457.0 184.624 3.950 -999.990 -999.990 1.846 ..P WKT 2010 08 28 06 29 55 31.3200 -97.3300 251.000 30.0 190.220 3.420 -999.990 -999.990 1.902 ..P WKT 2010 08 28 06 34 55 31.3200 -97.3300 251.000 122.0 190.181 3.240 -999.990 -999.990 1.902 ..P WKT 2010 08 28 06 39 55 31.3200 -97.3300 251.000 457.0 186.568 3.720 -999.990 -999.990 1.866 ..P WKT 2010 08 28 06 49 55 31.3200 -97.3300 251.000 30.0 188.375 3.020 -999.990 -999.990 1.884 ..P WKT 2010 08 28 06 54 55 31.3200 -97.3300 251.000 122.0 182.249 3.400 -999.990 -999.990 1.822 ..P WKT 2010 08 28 06 59 55 31.3200 -97.3300 251.000 457.0 181.895 3.900 -999.990 -999.990 1.819 ..P WKT 2010 08 28 07 04 55 31.3200 -97.3300 251.000 30.0 187.590 6.580 -999.990 -999.990 1.876 ..P WKT 2010 08 28 07 09 55 31.3200 -97.3300 251.000 122.0 185.862 4.330 -999.990 -999.990 1.859 ..P WKT 2010 08 28 07 14 55 31.3200 -97.3300 251.000 457.0 183.585 3.290 -999.990 -999.990 1.836 ..P WKT 2010 08 28 07 24 55 31.3200 -97.3300 251.000 30.0 188.710 3.470 -999.990 -999.990 1.887 ..P WKT 2010 08 28 07 29 55 31.3200 -97.3300 251.000 122.0 185.941 4.360 -999.990 -999.990 1.859 ..P WKT 2010 08 28 07 34 55 31.3200 -97.3300 251.000 457.0 184.822 4.470 -999.990 -999.990 1.848 ..P WKT 2010 08 28 07 39 55 31.3200 -97.3300 251.000 30.0 189.202 3.810 -999.990 -999.990 1.892 ..P WKT 2010 08 28 07 44 55 31.3200 -97.3300 251.000 122.0 178.186 4.350 -999.990 -999.990 1.782 ..P WKT 2010 08 28 07 49 55 31.3200 -97.3300 251.000 457.0 188.338 4.710 -999.990 -999.990 1.883 ..P WKT 2010 08 28 07 59 55 31.3200 -97.3300 251.000 30.0 179.816 4.470 -999.990 -999.990 1.798 ..P WKT 2010 08 28 08 04 55 31.3200 -97.3300 251.000 122.0 185.609 4.010 -999.990 -999.990 1.856 ..P WKT 2010 08 28 08 09 55 31.3200 -97.3300 251.000 457.0 183.155 4.190 -999.990 -999.990 1.832 ..P WKT 2010 08 28 08 14 55 31.3200 -97.3300 251.000 30.0 180.425 4.070 -999.990 -999.990 1.804 ..P WKT 2010 08 28 08 19 55 31.3200 -97.3300 251.000 122.0 192.266 3.790 -999.990 -999.990 1.923 ..P WKT 2010 08 28 08 24 55 31.3200 -97.3300 251.000 457.0 180.464 3.260 -999.990 -999.990 1.805 ..P WKT 2010 08 28 08 34 55 31.3200 -97.3300 251.000 30.0 186.926 3.330 -999.990 -999.990 1.869 ..P WKT 2010 08 28 08 39 55 31.3200 -97.3300 251.000 122.0 196.940 4.030 -999.990 -999.990 1.969 ..P WKT 2010 08 28 08 44 55 31.3200 -97.3300 251.000 457.0 180.288 4.190 -999.990 -999.990 1.803 ..P WKT 2010 08 28 08 49 55 31.3200 -97.3300 251.000 30.0 192.228 4.390 -999.990 -999.990 1.922 ..P WKT 2010 08 28 08 54 55 31.3200 -97.3300 251.000 122.0 201.555 4.820 -999.990 -999.990 2.016 ..P WKT 2010 08 28 08 59 55 31.3200 -97.3300 251.000 457.0 187.240 4.680 -999.990 -999.990 1.872 ..P WKT 2010 08 28 09 09 55 31.3200 -97.3300 251.000 30.0 191.089 5.380 -999.990 -999.990 1.911 ..P WKT 2010 08 28 09 14 55 31.3200 -97.3300 251.000 122.0 199.632 4.840 -999.990 -999.990 1.996 ..P WKT 2010 08 28 09 19 55 31.3200 -97.3300 251.000 457.0 188.792 4.420 -999.990 -999.990 1.888 ..P WKT 2010 08 28 09 24 55 31.3200 -97.3300 251.000 30.0 196.235 4.520 -999.990 -999.990 1.962 ..P WKT 2010 08 28 09 29 55 31.3200 -97.3300 251.000 122.0 194.880 3.810 -999.990 -999.990 1.949 ..P WKT 2010 08 28 09 34 55 31.3200 -97.3300 251.000 457.0 184.178 3.940 -999.990 -999.990 1.842 ..P WKT 2010 08 28 09 44 55 31.3200 -97.3300 251.000 30.0 196.707 4.260 -999.990 -999.990 1.967 ..P WKT 2010 08 28 09 49 55 31.3200 -97.3300 251.000 122.0 179.525 3.750 -999.990 -999.990 1.795 ..P WKT 2010 08 28 09 54 55 31.3200 -97.3300 251.000 457.0 188.734 3.390 -999.990 -999.990 1.887 ..P WKT 2010 08 28 09 59 55 31.3200 -97.3300 251.000 30.0 191.621 3.480 -999.990 -999.990 1.916 ..P WKT 2010 08 28 10 04 55 31.3200 -97.3300 251.000 122.0 190.109 4.250 -999.990 -999.990 1.901 ..P WKT 2010 08 28 10 09 55 31.3200 -97.3300 251.000 457.0 185.847 5.550 -999.990 -999.990 1.858 ..P WKT 2010 08 28 10 19 55 31.3200 -97.3300 251.000 30.0 194.469 3.570 -999.990 -999.990 1.945 ..P WKT 2010 08 28 10 24 55 31.3200 -97.3300 251.000 122.0 196.629 3.530 -999.990 -999.990 1.966 ..P WKT 2010 08 28 10 29 55 31.3200 -97.3300 251.000 457.0 188.754 4.840 -999.990 -999.990 1.888 ..P WKT 2010 08 28 10 34 55 31.3200 -97.3300 251.000 30.0 191.465 4.160 -999.990 -999.990 1.915 ..P WKT 2010 08 28 10 39 55 31.3200 -97.3300 251.000 122.0 200.498 4.310 -999.990 -999.990 2.005 ..P WKT 2010 08 28 10 44 55 31.3200 -97.3300 251.000 457.0 185.888 3.700 -999.990 -999.990 1.859 ..P WKT 2010 08 28 10 54 55 31.3200 -97.3300 251.000 30.0 192.643 5.650 -999.990 -999.990 1.926 ..P WKT 2010 08 28 10 59 55 31.3200 -97.3300 251.000 122.0 192.977 4.170 -999.990 -999.990 1.930 ..P WKT 2010 08 28 11 04 55 31.3200 -97.3300 251.000 457.0 184.239 4.190 -999.990 -999.990 1.842 ..P WKT 2010 08 28 11 09 55 31.3200 -97.3300 251.000 30.0 193.920 4.310 -999.990 -999.990 1.939 ..P WKT 2010 08 28 11 14 55 31.3200 -97.3300 251.000 122.0 201.402 5.270 -999.990 -999.990 2.014 ..P WKT 2010 08 28 11 19 55 31.3200 -97.3300 251.000 457.0 183.316 4.660 -999.990 -999.990 1.833 ..P WKT 2010 08 28 11 29 55 31.3200 -97.3300 251.000 30.0 197.618 5.150 -999.990 -999.990 1.976 ..P WKT 2010 08 28 11 34 55 31.3200 -97.3300 251.000 122.0 204.162 4.540 -999.990 -999.990 2.042 ..P WKT 2010 08 28 11 39 55 31.3200 -97.3300 251.000 457.0 187.887 5.210 -999.990 -999.990 1.879 ..P WKT 2010 08 28 11 44 55 31.3200 -97.3300 251.000 30.0 202.954 5.410 -999.990 -999.990 2.030 ..P WKT 2010 08 28 11 49 55 31.3200 -97.3300 251.000 122.0 210.873 5.680 -999.990 -999.990 2.109 ..P WKT 2010 08 28 12 09 55 31.3200 -97.3300 251.000 457.0 186.351 5.630 -999.990 -999.990 1.864 ..P WKT 2010 08 28 12 10 25 31.3200 -97.3300 251.000 457.0 186.523 4.290 -999.990 -999.990 1.865 ..P WKT 2010 08 28 12 10 55 31.3200 -97.3300 251.000 457.0 183.122 4.000 -999.990 -999.990 1.831 ..P WKT 2010 08 28 12 11 25 31.3200 -97.3300 251.000 457.0 187.692 4.150 -999.990 -999.990 1.877 ..P WKT 2010 08 28 12 11 55 31.3200 -97.3300 251.000 457.0 184.566 4.540 -999.990 -999.990 1.846 ..P WKT 2010 08 28 12 12 25 31.3200 -97.3300 251.000 457.0 182.264 4.930 -999.990 -999.990 1.823 ..P WKT 2010 08 28 12 12 55 31.3200 -97.3300 251.000 457.0 188.209 5.010 -999.990 -999.990 1.882 ..P WKT 2010 08 28 12 13 25 31.3200 -97.3300 251.000 457.0 183.983 4.470 -999.990 -999.990 1.840 ..P WKT 2010 08 28 12 13 55 31.3200 -97.3300 251.000 457.0 183.880 4.630 -999.990 -999.990 1.839 ..P WKT 2010 08 28 12 14 25 31.3200 -97.3300 251.000 457.0 184.877 5.510 -999.990 -999.990 1.849 ..P WKT 2010 08 28 12 14 55 31.3200 -97.3300 251.000 457.0 181.476 5.040 -999.990 -999.990 1.815 ..P WKT 2010 08 28 12 19 55 31.3200 -97.3300 251.000 30.0 202.436 5.530 -999.990 -999.990 2.024 ..P WKT 2010 08 28 12 24 55 31.3200 -97.3300 251.000 122.0 203.606 5.700 -999.990 -999.990 2.036 ..P WKT 2010 08 28 12 29 55 31.3200 -97.3300 251.000 457.0 183.893 4.950 -999.990 -999.990 1.839 ..P WKT 2010 08 28 12 34 55 31.3200 -97.3300 251.000 30.0 202.100 4.390 -999.990 -999.990 2.021 ..P WKT 2010 08 28 12 39 55 31.3200 -97.3300 251.000 122.0 201.896 4.030 -999.990 -999.990 2.019 ..P WKT 2010 08 28 12 44 55 31.3200 -97.3300 251.000 457.0 183.561 4.160 -999.990 -999.990 1.836 ..P WKT 2010 08 28 12 54 55 31.3200 -97.3300 251.000 30.0 209.842 4.860 -999.990 -999.990 2.098 ..P WKT 2010 08 28 12 59 55 31.3200 -97.3300 251.000 122.0 201.577 4.370 -999.990 -999.990 2.016 ..P WKT 2010 08 28 13 04 55 31.3200 -97.3300 251.000 457.0 175.598 4.330 -999.990 -999.990 1.756 ..P WKT 2010 08 28 13 09 55 31.3200 -97.3300 251.000 30.0 199.055 4.690 -999.990 -999.990 1.991 ..P WKT 2010 08 28 13 14 55 31.3200 -97.3300 251.000 122.0 203.287 5.160 -999.990 -999.990 2.033 ..P WKT 2010 08 28 13 19 55 31.3200 -97.3300 251.000 457.0 176.078 5.310 -999.990 -999.990 1.761 ..P WKT 2010 08 28 13 29 55 31.3200 -97.3300 251.000 30.0 201.878 5.140 -999.990 -999.990 2.019 ..P WKT 2010 08 28 13 34 55 31.3200 -97.3300 251.000 122.0 197.638 6.210 -999.990 -999.990 1.976 ..P WKT 2010 08 28 13 39 55 31.3200 -97.3300 251.000 457.0 182.419 5.460 -999.990 -999.990 1.824 ..P WKT 2010 08 28 13 44 55 31.3200 -97.3300 251.000 30.0 208.372 5.440 -999.990 -999.990 2.084 ..P WKT 2010 08 28 13 49 55 31.3200 -97.3300 251.000 122.0 207.975 6.230 -999.990 -999.990 2.080 ..P WKT 2010 08 28 13 54 55 31.3200 -97.3300 251.000 457.0 184.250 4.990 -999.990 -999.990 1.843 ..P WKT 2010 08 28 14 04 55 31.3200 -97.3300 251.000 30.0 208.820 6.010 -999.990 -999.990 2.088 ..P WKT 2010 08 28 14 09 55 31.3200 -97.3300 251.000 122.0 204.835 5.210 -999.990 -999.990 2.048 ..P WKT 2010 08 28 14 14 55 31.3200 -97.3300 251.000 457.0 193.582 5.130 -999.990 -999.990 1.936 ..P WKT 2010 08 28 14 19 55 31.3200 -97.3300 251.000 30.0 209.900 4.820 -999.990 -999.990 2.099 ..P WKT 2010 08 28 14 24 55 31.3200 -97.3300 251.000 122.0 214.694 4.500 -999.990 -999.990 2.147 ..P WKT 2010 08 28 14 29 55 31.3200 -97.3300 251.000 457.0 197.134 5.360 -999.990 -999.990 1.971 ..P WKT 2010 08 28 14 39 55 31.3200 -97.3300 251.000 30.0 208.995 4.650 -999.990 -999.990 2.090 ..P WKT 2010 08 28 14 44 55 31.3200 -97.3300 251.000 122.0 217.569 4.530 -999.990 -999.990 2.176 ..P WKT 2010 08 28 14 49 55 31.3200 -97.3300 251.000 457.0 192.140 4.560 -999.990 -999.990 1.921 ..P WKT 2010 08 28 14 54 55 31.3200 -97.3300 251.000 30.0 220.181 4.850 -999.990 -999.990 2.202 ..P WKT 2010 08 28 14 59 55 31.3200 -97.3300 251.000 122.0 224.639 5.410 -999.990 -999.990 2.246 ..P WKT 2010 08 28 15 04 55 31.3200 -97.3300 251.000 457.0 196.199 5.760 -999.990 -999.990 1.962 ..P WKT 2010 08 28 15 14 55 31.3200 -97.3300 251.000 30.0 210.090 5.440 -999.990 -999.990 2.101 ..P WKT 2010 08 28 15 19 55 31.3200 -97.3300 251.000 122.0 209.380 4.960 -999.990 -999.990 2.094 ..P WKT 2010 08 28 15 24 55 31.3200 -97.3300 251.000 457.0 192.500 4.660 -999.990 -999.990 1.925 ..P WKT 2010 08 28 15 29 55 31.3200 -97.3300 251.000 30.0 205.218 4.560 -999.990 -999.990 2.052 ..P WKT 2010 08 28 15 34 55 31.3200 -97.3300 251.000 122.0 212.181 4.580 -999.990 -999.990 2.122 ..P WKT 2010 08 28 15 39 55 31.3200 -97.3300 251.000 457.0 199.140 4.620 -999.990 -999.990 1.991 ..P WKT 2010 08 28 15 49 55 31.3200 -97.3300 251.000 30.0 207.975 4.170 -999.990 -999.990 2.080 ..P WKT 2010 08 28 15 54 55 31.3200 -97.3300 251.000 122.0 217.244 4.430 -999.990 -999.990 2.172 ..P WKT 2010 08 28 15 59 55 31.3200 -97.3300 251.000 457.0 191.451 4.620 -999.990 -999.990 1.915 ..P WKT 2010 08 28 16 04 55 31.3200 -97.3300 251.000 30.0 210.032 5.090 -999.990 -999.990 2.100 ..P WKT 2010 08 28 16 09 55 31.3200 -97.3300 251.000 122.0 211.630 4.600 -999.990 -999.990 2.116 ..P WKT 2010 08 28 16 14 55 31.3200 -97.3300 251.000 457.0 197.893 5.270 -999.990 -999.990 1.979 ..P WKT 2010 08 28 16 24 55 31.3200 -97.3300 251.000 30.0 202.773 3.850 -999.990 -999.990 2.028 ..P WKT 2010 08 28 16 29 55 31.3200 -97.3300 251.000 122.0 201.124 5.220 -999.990 -999.990 2.011 ..P WKT 2010 08 28 16 34 55 31.3200 -97.3300 251.000 457.0 194.959 6.910 -999.990 -999.990 1.950 ..P WKT 2010 08 28 16 39 55 31.3200 -97.3300 251.000 30.0 199.882 5.410 -999.990 -999.990 1.999 ..P WKT 2010 08 28 16 44 55 31.3200 -97.3300 251.000 122.0 195.224 5.590 -999.990 -999.990 1.952 ..P WKT 2010 08 28 16 49 55 31.3200 -97.3300 251.000 457.0 190.566 4.130 -999.990 -999.990 1.906 ..P WKT 2010 08 28 17 04 55 31.3200 -97.3300 251.000 30.0 185.217 6.650 -999.990 -999.990 1.852 ..P WKT 2010 08 28 17 09 55 31.3200 -97.3300 251.000 122.0 190.822 5.120 -999.990 -999.990 1.908 ..P WKT 2010 08 28 17 14 55 31.3200 -97.3300 251.000 457.0 196.837 5.330 -999.990 -999.990 1.968 ..P WKT 2010 08 28 17 19 55 31.3200 -97.3300 251.000 30.0 189.172 3.940 -999.990 -999.990 1.892 ..P WKT 2010 08 28 17 24 55 31.3200 -97.3300 251.000 122.0 194.502 4.010 -999.990 -999.990 1.945 ..P WKT 2010 08 28 17 29 55 31.3200 -97.3300 251.000 457.0 191.762 4.210 -999.990 -999.990 1.918 ..P WKT 2010 08 28 17 39 55 31.3200 -97.3300 251.000 30.0 191.362 5.010 -999.990 -999.990 1.914 ..P WKT 2010 08 28 17 44 55 31.3200 -97.3300 251.000 122.0 199.992 5.330 -999.990 -999.990 2.000 ..P WKT 2010 08 28 17 49 55 31.3200 -97.3300 251.000 457.0 195.904 5.270 -999.990 -999.990 1.959 ..P WKT 2010 08 28 17 54 55 31.3200 -97.3300 251.000 30.0 193.596 6.170 -999.990 -999.990 1.936 ..P WKT 2010 08 28 17 59 55 31.3200 -97.3300 251.000 122.0 195.387 4.910 -999.990 -999.990 1.954 ..P WKT 2010 08 28 18 04 55 31.3200 -97.3300 251.000 457.0 184.877 5.320 -999.990 -999.990 1.849 ..P WKT 2010 08 28 18 14 55 31.3200 -97.3300 251.000 30.0 182.897 6.000 -999.990 -999.990 1.829 ..P WKT 2010 08 28 18 19 55 31.3200 -97.3300 251.000 122.0 193.611 4.620 -999.990 -999.990 1.936 ..P WKT 2010 08 28 18 24 55 31.3200 -97.3300 251.000 457.0 190.386 4.750 -999.990 -999.990 1.904 ..P WKT 2010 08 28 18 29 55 31.3200 -97.3300 251.000 30.0 187.434 4.820 -999.990 -999.990 1.874 ..P WKT 2010 08 28 18 34 55 31.3200 -97.3300 251.000 122.0 191.588 3.880 -999.990 -999.990 1.916 ..P WKT 2010 08 28 18 39 55 31.3200 -97.3300 251.000 457.0 184.538 3.400 -999.990 -999.990 1.845 ..P WKT 2010 08 28 18 49 55 31.3200 -97.3300 251.000 30.0 188.491 4.110 -999.990 -999.990 1.885 ..P WKT 2010 08 28 18 54 55 31.3200 -97.3300 251.000 122.0 195.121 4.040 -999.990 -999.990 1.951 ..P WKT 2010 08 28 18 59 55 31.3200 -97.3300 251.000 457.0 182.630 4.390 -999.990 -999.990 1.826 ..P WKT 2010 08 28 19 04 55 31.3200 -97.3300 251.000 30.0 179.153 4.050 -999.990 -999.990 1.792 ..P WKT 2010 08 28 19 09 55 31.3200 -97.3300 251.000 122.0 186.055 3.790 -999.990 -999.990 1.861 ..P WKT 2010 08 28 19 14 55 31.3200 -97.3300 251.000 457.0 188.587 4.100 -999.990 -999.990 1.886 ..P WKT 2010 08 28 19 24 55 31.3200 -97.3300 251.000 30.0 176.174 4.870 -999.990 -999.990 1.762 ..P WKT 2010 08 28 19 29 55 31.3200 -97.3300 251.000 122.0 181.164 4.190 -999.990 -999.990 1.812 ..P WKT 2010 08 28 19 34 55 31.3200 -97.3300 251.000 457.0 184.241 4.220 -999.990 -999.990 1.842 ..P WKT 2010 08 28 19 39 55 31.3200 -97.3300 251.000 30.0 182.677 5.640 -999.990 -999.990 1.827 ..P WKT 2010 08 28 19 44 55 31.3200 -97.3300 251.000 122.0 187.938 4.110 -999.990 -999.990 1.879 ..P WKT 2010 08 28 19 49 55 31.3200 -97.3300 251.000 457.0 178.459 3.890 -999.990 -999.990 1.785 ..P WKT 2010 08 28 19 59 55 31.3200 -97.3300 251.000 30.0 179.330 3.640 -999.990 -999.990 1.793 ..P WKT 2010 08 28 20 04 55 31.3200 -97.3300 251.000 122.0 179.579 4.010 -999.990 -999.990 1.796 ..P WKT 2010 08 28 20 09 55 31.3200 -97.3300 251.000 457.0 177.373 4.740 -999.990 -999.990 1.774 ..P WKT 2010 08 28 20 14 55 31.3200 -97.3300 251.000 30.0 172.712 6.310 -999.990 -999.990 1.727 ..P WKT 2010 08 28 20 19 55 31.3200 -97.3300 251.000 122.0 183.056 4.870 -999.990 -999.990 1.831 ..P WKT 2010 08 28 20 24 55 31.3200 -97.3300 251.000 457.0 175.122 4.030 -999.990 -999.990 1.751 ..P WKT 2010 08 28 20 34 55 31.3200 -97.3300 251.000 30.0 172.914 3.810 -999.990 -999.990 1.729 ..P WKT 2010 08 28 20 39 55 31.3200 -97.3300 251.000 122.0 189.003 5.430 -999.990 -999.990 1.890 ..P WKT 2010 08 28 20 44 55 31.3200 -97.3300 251.000 457.0 177.408 5.410 -999.990 -999.990 1.774 ..P WKT 2010 08 28 20 49 55 31.3200 -97.3300 251.000 30.0 179.995 5.490 -999.990 -999.990 1.800 ..P WKT 2010 08 28 20 54 55 31.3200 -97.3300 251.000 122.0 182.855 4.490 -999.990 -999.990 1.829 ..P WKT 2010 08 28 20 59 55 31.3200 -97.3300 251.000 457.0 170.445 3.610 -999.990 -999.990 1.704 ..P WKT 2010 08 28 21 09 55 31.3200 -97.3300 251.000 30.0 166.039 3.720 -999.990 -999.990 1.660 ..P WKT 2010 08 28 21 14 55 31.3200 -97.3300 251.000 122.0 176.356 4.470 -999.990 -999.990 1.764 ..P WKT 2010 08 28 21 19 55 31.3200 -97.3300 251.000 457.0 174.542 5.060 -999.990 -999.990 1.745 ..P WKT 2010 08 28 21 24 55 31.3200 -97.3300 251.000 30.0 170.957 4.200 -999.990 -999.990 1.710 ..P WKT 2010 08 28 21 29 55 31.3200 -97.3300 251.000 122.0 177.456 3.710 -999.990 -999.990 1.775 ..P WKT 2010 08 28 21 34 55 31.3200 -97.3300 251.000 457.0 174.416 4.360 -999.990 -999.990 1.744 ..P WKT 2010 08 28 21 44 55 31.3200 -97.3300 251.000 30.0 164.387 3.930 -999.990 -999.990 1.644 ..P WKT 2010 08 28 21 49 55 31.3200 -97.3300 251.000 122.0 173.473 5.490 -999.990 -999.990 1.735 ..P WKT 2010 08 28 21 54 55 31.3200 -97.3300 251.000 457.0 169.889 3.990 -999.990 -999.990 1.699 ..P WKT 2010 08 28 21 59 55 31.3200 -97.3300 251.000 30.0 168.486 4.190 -999.990 -999.990 1.685 ..P WKT 2010 08 28 22 04 55 31.3200 -97.3300 251.000 122.0 170.759 4.240 -999.990 -999.990 1.708 ..P WKT 2010 08 28 22 09 55 31.3200 -97.3300 251.000 457.0 169.764 3.930 -999.990 -999.990 1.698 ..P WKT 2010 08 28 22 19 55 31.3200 -97.3300 251.000 30.0 167.697 5.170 -999.990 -999.990 1.677 ..P WKT 2010 08 28 22 24 55 31.3200 -97.3300 251.000 122.0 167.305 4.340 -999.990 -999.990 1.673 ..P WKT 2010 08 28 22 29 55 31.3200 -97.3300 251.000 457.0 165.553 4.220 -999.990 -999.990 1.656 ..P WKT 2010 08 28 22 34 55 31.3200 -97.3300 251.000 30.0 167.339 3.830 -999.990 -999.990 1.673 ..P WKT 2010 08 28 22 39 55 31.3200 -97.3300 251.000 122.0 168.853 4.850 -999.990 -999.990 1.689 ..P WKT 2010 08 28 22 44 55 31.3200 -97.3300 251.000 457.0 156.484 4.640 -999.990 -999.990 1.565 ..P WKT 2010 08 28 22 54 55 31.3200 -97.3300 251.000 30.0 162.274 3.420 -999.990 -999.990 1.623 ..P WKT 2010 08 28 22 59 55 31.3200 -97.3300 251.000 122.0 164.372 3.480 -999.990 -999.990 1.644 ..P WKT 2010 08 28 23 04 55 31.3200 -97.3300 251.000 457.0 159.665 3.220 -999.990 -999.990 1.597 ..P WKT 2010 08 28 23 09 55 31.3200 -97.3300 251.000 30.0 157.681 4.130 -999.990 -999.990 1.577 ..P WKT 2010 08 28 23 14 55 31.3200 -97.3300 251.000 122.0 168.756 3.680 -999.990 -999.990 1.688 ..P WKT 2010 08 28 23 19 55 31.3200 -97.3300 251.000 457.0 155.889 2.720 -999.990 -999.990 1.559 ..P WKT 2010 08 28 23 29 55 31.3200 -97.3300 251.000 30.0 160.841 3.300 -999.990 -999.990 1.608 ..P WKT 2010 08 28 23 34 55 31.3200 -97.3300 251.000 122.0 171.311 3.600 -999.990 -999.990 1.713 ..P WKT 2010 08 28 23 39 55 31.3200 -97.3300 251.000 457.0 162.196 5.650 -999.990 -999.990 1.622 ..P WKT 2010 08 28 23 44 55 31.3200 -97.3300 251.000 30.0 161.786 4.910 -999.990 -999.990 1.618 ..P WKT 2010 08 28 23 49 55 31.3200 -97.3300 251.000 122.0 170.622 5.780 -999.990 -999.990 1.706 ..P WKT 2010 08 29 00 09 55 31.3200 -97.3300 251.000 457.0 170.835 3.060 -999.990 -999.990 1.708 ..P WKT 2010 08 29 00 10 25 31.3200 -97.3300 251.000 457.0 171.849 2.850 -999.990 -999.990 1.718 ..P WKT 2010 08 29 00 10 55 31.3200 -97.3300 251.000 457.0 172.592 3.610 -999.990 -999.990 1.726 ..P WKT 2010 08 29 00 11 25 31.3200 -97.3300 251.000 457.0 170.616 3.040 -999.990 -999.990 1.706 ..P WKT 2010 08 29 00 11 55 31.3200 -97.3300 251.000 457.0 174.622 3.130 -999.990 -999.990 1.746 ..P WKT 2010 08 29 00 12 25 31.3200 -97.3300 251.000 457.0 172.917 3.590 -999.990 -999.990 1.729 ..P WKT 2010 08 29 00 12 55 31.3200 -97.3300 251.000 457.0 173.116 3.960 -999.990 -999.990 1.731 ..P WKT 2010 08 29 00 13 25 31.3200 -97.3300 251.000 457.0 168.691 3.450 -999.990 -999.990 1.687 ..P WKT 2010 08 29 00 13 55 31.3200 -97.3300 251.000 457.0 170.250 3.520 -999.990 -999.990 1.703 ..P WKT 2010 08 29 00 14 25 31.3200 -97.3300 251.000 457.0 168.001 4.530 -999.990 -999.990 1.680 ..P WKT 2010 08 29 00 14 55 31.3200 -97.3300 251.000 457.0 172.824 4.400 -999.990 -999.990 1.728 ..P WKT 2010 08 29 00 19 55 31.3200 -97.3300 251.000 30.0 170.189 4.410 -999.990 -999.990 1.702 ..P WKT 2010 08 29 00 24 55 31.3200 -97.3300 251.000 122.0 182.789 4.520 -999.990 -999.990 1.828 ..P WKT 2010 08 29 00 29 55 31.3200 -97.3300 251.000 457.0 174.576 4.070 -999.990 -999.990 1.746 ..P WKT 2010 08 29 00 34 55 31.3200 -97.3300 251.000 30.0 167.994 3.500 -999.990 -999.990 1.680 ..P WKT 2010 08 29 00 39 55 31.3200 -97.3300 251.000 122.0 176.244 2.980 -999.990 -999.990 1.762 ..P WKT 2010 08 29 00 44 55 31.3200 -97.3300 251.000 457.0 169.660 3.050 -999.990 -999.990 1.697 ..P WKT 2010 08 29 00 54 55 31.3200 -97.3300 251.000 30.0 163.083 3.210 -999.990 -999.990 1.631 ..P WKT 2010 08 29 00 59 55 31.3200 -97.3300 251.000 122.0 169.899 3.150 -999.990 -999.990 1.699 ..P WKT 2010 08 29 01 04 55 31.3200 -97.3300 251.000 457.0 167.866 3.050 -999.990 -999.990 1.679 ..P WKT 2010 08 29 01 09 55 31.3200 -97.3300 251.000 30.0 169.100 3.120 -999.990 -999.990 1.691 ..P WKT 2010 08 29 01 14 55 31.3200 -97.3300 251.000 122.0 169.654 3.500 -999.990 -999.990 1.697 ..P WKT 2010 08 29 01 19 55 31.3200 -97.3300 251.000 457.0 173.886 3.870 -999.990 -999.990 1.739 ..P WKT 2010 08 29 01 29 55 31.3200 -97.3300 251.000 30.0 170.402 3.690 -999.990 -999.990 1.704 ..P WKT 2010 08 29 01 34 55 31.3200 -97.3300 251.000 122.0 174.402 3.170 -999.990 -999.990 1.744 ..P WKT 2010 08 29 01 39 55 31.3200 -97.3300 251.000 457.0 176.631 3.180 -999.990 -999.990 1.766 ..P WKT 2010 08 29 01 44 55 31.3200 -97.3300 251.000 30.0 167.138 3.700 -999.990 -999.990 1.671 ..P WKT 2010 08 29 01 49 55 31.3200 -97.3300 251.000 122.0 181.229 4.130 -999.990 -999.990 1.812 ..P WKT 2010 08 29 01 54 55 31.3200 -97.3300 251.000 457.0 171.325 4.200 -999.990 -999.990 1.713 ..P WKT 2010 08 29 02 04 55 31.3200 -97.3300 251.000 30.0 171.304 4.070 -999.990 -999.990 1.713 ..P WKT 2010 08 29 02 09 55 31.3200 -97.3300 251.000 122.0 177.510 5.080 -999.990 -999.990 1.775 ..P WKT 2010 08 29 02 14 55 31.3200 -97.3300 251.000 457.0 175.805 5.550 -999.990 -999.990 1.758 ..P WKT 2010 08 29 02 19 55 31.3200 -97.3300 251.000 30.0 171.644 4.690 -999.990 -999.990 1.716 ..P WKT 2010 08 29 02 24 55 31.3200 -97.3300 251.000 122.0 179.900 4.250 -999.990 -999.990 1.799 ..P WKT 2010 08 29 02 29 55 31.3200 -97.3300 251.000 457.0 177.921 4.030 -999.990 -999.990 1.779 ..P WKT 2010 08 29 02 39 55 31.3200 -97.3300 251.000 30.0 177.044 4.280 -999.990 -999.990 1.770 ..P WKT 2010 08 29 02 44 55 31.3200 -97.3300 251.000 122.0 177.055 6.160 -999.990 -999.990 1.771 ..P WKT 2010 08 29 02 49 55 31.3200 -97.3300 251.000 457.0 165.868 4.540 -999.990 -999.990 1.659 ..P WKT 2010 08 29 02 54 55 31.3200 -97.3300 251.000 30.0 178.987 3.870 -999.990 -999.990 1.790 ..P WKT 2010 08 29 02 59 55 31.3200 -97.3300 251.000 122.0 182.002 3.910 -999.990 -999.990 1.820 ..P WKT 2010 08 29 03 04 55 31.3200 -97.3300 251.000 457.0 168.352 3.460 -999.990 -999.990 1.684 ..P WKT 2010 08 29 03 14 55 31.3200 -97.3300 251.000 30.0 174.265 3.690 -999.990 -999.990 1.743 ..P WKT 2010 08 29 03 19 55 31.3200 -97.3300 251.000 122.0 186.730 3.250 -999.990 -999.990 1.867 ..P WKT 2010 08 29 03 24 55 31.3200 -97.3300 251.000 457.0 175.417 3.030 -999.990 -999.990 1.754 ..P WKT 2010 08 29 03 29 55 31.3200 -97.3300 251.000 30.0 177.770 3.410 -999.990 -999.990 1.778 ..P WKT 2010 08 29 03 34 55 31.3200 -97.3300 251.000 122.0 186.685 3.770 -999.990 -999.990 1.867 ..P WKT 2010 08 29 03 39 55 31.3200 -97.3300 251.000 457.0 176.736 2.970 -999.990 -999.990 1.767 ..P WKT 2010 08 29 03 49 55 31.3200 -97.3300 251.000 30.0 177.147 3.050 -999.990 -999.990 1.771 ..P WKT 2010 08 29 03 54 55 31.3200 -97.3300 251.000 122.0 183.136 3.740 -999.990 -999.990 1.831 ..P WKT 2010 08 29 03 59 55 31.3200 -97.3300 251.000 457.0 178.183 3.140 -999.990 -999.990 1.782 ..P WKT 2010 08 29 04 04 55 31.3200 -97.3300 251.000 30.0 178.154 3.440 -999.990 -999.990 1.782 ..P WKT 2010 08 29 04 09 55 31.3200 -97.3300 251.000 122.0 189.346 3.210 -999.990 -999.990 1.893 ..P WKT 2010 08 29 04 14 55 31.3200 -97.3300 251.000 457.0 174.265 3.290 -999.990 -999.990 1.743 ..P WKT 2010 08 29 04 24 55 31.3200 -97.3300 251.000 30.0 185.313 3.220 -999.990 -999.990 1.853 ..P WKT 2010 08 29 04 29 55 31.3200 -97.3300 251.000 122.0 174.079 3.470 -999.990 -999.990 1.741 ..P WKT 2010 08 29 04 34 55 31.3200 -97.3300 251.000 457.0 168.319 3.340 -999.990 -999.990 1.683 ..P WKT 2010 08 29 04 39 55 31.3200 -97.3300 251.000 30.0 180.358 4.540 -999.990 -999.990 1.804 ..P WKT 2010 08 29 04 44 55 31.3200 -97.3300 251.000 122.0 156.383 3.880 -999.990 -999.990 1.564 ..P WKT 2010 08 29 04 49 55 31.3200 -97.3300 251.000 457.0 139.114 3.890 -999.990 -999.990 1.391 ..P WKT 2010 08 29 05 04 55 31.3200 -97.3300 251.000 30.0 164.355 3.780 -999.990 -999.990 1.644 ..P WKT 2010 08 29 05 09 55 31.3200 -97.3300 251.000 122.0 144.168 4.670 -999.990 -999.990 1.442 ..P WKT 2010 08 29 05 14 55 31.3200 -97.3300 251.000 457.0 120.275 4.190 -999.990 -999.990 1.203 ..P WKT 2010 08 29 05 19 55 31.3200 -97.3300 251.000 30.0 154.632 3.340 -999.990 -999.990 1.546 ..P WKT 2010 08 29 05 24 55 31.3200 -97.3300 251.000 122.0 144.306 4.060 -999.990 -999.990 1.443 ..P WKT 2010 08 29 05 29 55 31.3200 -97.3300 251.000 457.0 141.656 4.410 -999.990 -999.990 1.417 ..P WKT 2010 08 29 05 39 55 31.3200 -97.3300 251.000 30.0 152.684 3.220 -999.990 -999.990 1.527 ..P WKT 2010 08 29 05 44 55 31.3200 -97.3300 251.000 122.0 146.206 4.270 -999.990 -999.990 1.462 ..P WKT 2010 08 29 05 49 55 31.3200 -97.3300 251.000 457.0 149.328 3.550 -999.990 -999.990 1.493 ..P WKT 2010 08 29 05 54 55 31.3200 -97.3300 251.000 30.0 153.274 3.510 -999.990 -999.990 1.533 ..P WKT 2010 08 29 05 59 55 31.3200 -97.3300 251.000 122.0 149.263 3.300 -999.990 -999.990 1.493 ..P WKT 2010 08 29 06 04 55 31.3200 -97.3300 251.000 457.0 158.836 3.610 -999.990 -999.990 1.588 ..P WKT 2010 08 29 06 14 55 31.3200 -97.3300 251.000 30.0 146.125 4.430 -999.990 -999.990 1.461 ..P WKT 2010 08 29 06 19 55 31.3200 -97.3300 251.000 122.0 170.234 3.330 -999.990 -999.990 1.702 ..P WKT 2010 08 29 06 24 55 31.3200 -97.3300 251.000 457.0 169.772 4.750 -999.990 -999.990 1.698 ..P WKT 2010 08 29 06 29 55 31.3200 -97.3300 251.000 30.0 157.914 3.270 -999.990 -999.990 1.579 ..P WKT 2010 08 29 06 34 55 31.3200 -97.3300 251.000 122.0 179.012 3.470 -999.990 -999.990 1.790 ..P WKT 2010 08 29 06 39 55 31.3200 -97.3300 251.000 457.0 164.953 3.280 -999.990 -999.990 1.650 ..P WKT 2010 08 29 06 49 55 31.3200 -97.3300 251.000 30.0 170.407 3.800 -999.990 -999.990 1.704 ..P WKT 2010 08 29 06 54 55 31.3200 -97.3300 251.000 122.0 192.127 3.770 -999.990 -999.990 1.921 ..P WKT 2010 08 29 06 59 55 31.3200 -97.3300 251.000 457.0 167.677 3.890 -999.990 -999.990 1.677 ..P WKT 2010 08 29 07 04 55 31.3200 -97.3300 251.000 30.0 183.904 4.930 -999.990 -999.990 1.839 ..P WKT 2010 08 29 07 09 55 31.3200 -97.3300 251.000 122.0 186.939 4.330 -999.990 -999.990 1.869 ..P WKT 2010 08 29 07 14 55 31.3200 -97.3300 251.000 457.0 165.230 4.160 -999.990 -999.990 1.652 ..P WKT 2010 08 29 07 24 55 31.3200 -97.3300 251.000 30.0 190.391 4.450 -999.990 -999.990 1.904 ..P WKT 2010 08 29 07 29 55 31.3200 -97.3300 251.000 122.0 193.822 4.270 -999.990 -999.990 1.938 ..P WKT 2010 08 29 07 34 55 31.3200 -97.3300 251.000 457.0 168.918 4.110 -999.990 -999.990 1.689 ..P WKT 2010 08 29 07 39 55 31.3200 -97.3300 251.000 30.0 188.030 4.340 -999.990 -999.990 1.880 ..P WKT 2010 08 29 07 44 55 31.3200 -97.3300 251.000 122.0 196.689 4.180 -999.990 -999.990 1.967 ..P WKT 2010 08 29 07 49 55 31.3200 -97.3300 251.000 457.0 179.207 4.060 -999.990 -999.990 1.792 ..P WKT 2010 08 29 07 59 55 31.3200 -97.3300 251.000 30.0 189.629 4.340 -999.990 -999.990 1.896 ..P WKT 2010 08 29 08 04 55 31.3200 -97.3300 251.000 122.0 194.420 5.020 -999.990 -999.990 1.944 ..P WKT 2010 08 29 08 09 55 31.3200 -97.3300 251.000 457.0 183.792 4.620 -999.990 -999.990 1.838 ..P WKT 2010 08 29 08 14 55 31.3200 -97.3300 251.000 30.0 190.785 5.110 -999.990 -999.990 1.908 ..P WKT 2010 08 29 08 19 55 31.3200 -97.3300 251.000 122.0 188.142 4.480 -999.990 -999.990 1.881 ..P WKT 2010 08 29 08 24 55 31.3200 -97.3300 251.000 457.0 178.336 4.610 -999.990 -999.990 1.783 ..P WKT 2010 08 29 08 34 55 31.3200 -97.3300 251.000 30.0 193.312 4.450 -999.990 -999.990 1.933 ..P WKT 2010 08 29 08 39 55 31.3200 -97.3300 251.000 122.0 195.097 6.540 -999.990 -999.990 1.951 ..P WKT 2010 08 29 08 44 55 31.3200 -97.3300 251.000 457.0 171.113 4.730 -999.990 -999.990 1.711 ..P WKT 2010 08 29 08 49 55 31.3200 -97.3300 251.000 30.0 190.396 5.150 -999.990 -999.990 1.904 ..P WKT 2010 08 29 08 54 55 31.3200 -97.3300 251.000 122.0 189.423 4.110 -999.990 -999.990 1.894 ..P WKT 2010 08 29 08 59 55 31.3200 -97.3300 251.000 457.0 176.596 4.330 -999.990 -999.990 1.766 ..P WKT 2010 08 29 09 09 55 31.3200 -97.3300 251.000 30.0 191.370 4.530 -999.990 -999.990 1.914 ..P WKT 2010 08 29 09 14 55 31.3200 -97.3300 251.000 122.0 197.469 4.270 -999.990 -999.990 1.975 ..P WKT 2010 08 29 09 19 55 31.3200 -97.3300 251.000 457.0 184.261 4.090 -999.990 -999.990 1.843 ..P WKT 2010 08 29 09 24 55 31.3200 -97.3300 251.000 30.0 193.120 4.400 -999.990 -999.990 1.931 ..P WKT 2010 08 29 09 29 55 31.3200 -97.3300 251.000 122.0 190.393 4.240 -999.990 -999.990 1.904 ..P WKT 2010 08 29 09 34 55 31.3200 -97.3300 251.000 457.0 194.701 4.700 -999.990 -999.990 1.947 ..P WKT 2010 08 29 09 44 55 31.3200 -97.3300 251.000 30.0 193.563 4.090 -999.990 -999.990 1.936 ..P WKT 2010 08 29 09 49 55 31.3200 -97.3300 251.000 122.0 197.361 4.310 -999.990 -999.990 1.974 ..P WKT 2010 08 29 09 54 55 31.3200 -97.3300 251.000 457.0 180.040 4.240 -999.990 -999.990 1.800 ..P WKT 2010 08 29 09 59 55 31.3200 -97.3300 251.000 30.0 191.431 4.850 -999.990 -999.990 1.914 ..P WKT 2010 08 29 10 04 55 31.3200 -97.3300 251.000 122.0 193.849 4.760 -999.990 -999.990 1.938 ..P WKT 2010 08 29 10 09 55 31.3200 -97.3300 251.000 457.0 184.945 4.410 -999.990 -999.990 1.849 ..P WKT 2010 08 29 10 19 55 31.3200 -97.3300 251.000 30.0 197.261 4.480 -999.990 -999.990 1.973 ..P WKT 2010 08 29 10 24 55 31.3200 -97.3300 251.000 122.0 191.826 4.530 -999.990 -999.990 1.918 ..P WKT 2010 08 29 10 29 55 31.3200 -97.3300 251.000 457.0 186.253 4.850 -999.990 -999.990 1.863 ..P WKT 2010 08 29 10 34 55 31.3200 -97.3300 251.000 30.0 194.495 5.530 -999.990 -999.990 1.945 ..P WKT 2010 08 29 10 39 55 31.3200 -97.3300 251.000 122.0 198.594 4.900 -999.990 -999.990 1.986 ..P WKT 2010 08 29 10 44 55 31.3200 -97.3300 251.000 457.0 194.402 4.790 -999.990 -999.990 1.944 ..P WKT 2010 08 29 10 54 55 31.3200 -97.3300 251.000 30.0 189.785 4.390 -999.990 -999.990 1.898 ..P WKT 2010 08 29 10 59 55 31.3200 -97.3300 251.000 122.0 191.851 4.960 -999.990 -999.990 1.919 ..P WKT 2010 08 29 11 04 55 31.3200 -97.3300 251.000 457.0 181.748 5.420 -999.990 -999.990 1.817 ..P WKT 2010 08 29 11 09 55 31.3200 -97.3300 251.000 30.0 201.241 5.100 -999.990 -999.990 2.012 ..P WKT 2010 08 29 11 14 55 31.3200 -97.3300 251.000 122.0 193.073 4.720 -999.990 -999.990 1.931 ..P WKT 2010 08 29 11 19 55 31.3200 -97.3300 251.000 457.0 200.951 4.330 -999.990 -999.990 2.010 ..P WKT 2010 08 29 11 29 55 31.3200 -97.3300 251.000 30.0 201.580 4.100 -999.990 -999.990 2.016 ..P WKT 2010 08 29 11 34 55 31.3200 -97.3300 251.000 122.0 194.881 4.600 -999.990 -999.990 1.949 ..P WKT 2010 08 29 11 39 55 31.3200 -97.3300 251.000 457.0 193.440 5.600 -999.990 -999.990 1.934 ..P WKT 2010 08 29 11 44 55 31.3200 -97.3300 251.000 30.0 205.288 5.240 -999.990 -999.990 2.053 ..P WKT 2010 08 29 11 49 55 31.3200 -97.3300 251.000 122.0 191.942 4.620 -999.990 -999.990 1.919 ..P WKT 2010 08 29 12 09 55 31.3200 -97.3300 251.000 457.0 183.566 5.010 -999.990 -999.990 1.836 ..P WKT 2010 08 29 12 10 25 31.3200 -97.3300 251.000 457.0 182.492 4.250 -999.990 -999.990 1.825 ..P WKT 2010 08 29 12 10 55 31.3200 -97.3300 251.000 457.0 183.080 4.320 -999.990 -999.990 1.831 ..P WKT 2010 08 29 12 11 25 31.3200 -97.3300 251.000 457.0 186.992 4.290 -999.990 -999.990 1.870 ..P WKT 2010 08 29 12 11 55 31.3200 -97.3300 251.000 457.0 190.073 4.390 -999.990 -999.990 1.901 ..P WKT 2010 08 29 12 12 25 31.3200 -97.3300 251.000 457.0 184.844 4.540 -999.990 -999.990 1.848 ..P WKT 2010 08 29 12 12 55 31.3200 -97.3300 251.000 457.0 181.000 5.220 -999.990 -999.990 1.810 ..P WKT 2010 08 29 12 13 25 31.3200 -97.3300 251.000 457.0 179.648 4.310 -999.990 -999.990 1.796 ..P WKT 2010 08 29 12 13 55 31.3200 -97.3300 251.000 457.0 183.700 4.730 -999.990 -999.990 1.837 ..P WKT 2010 08 29 12 14 25 31.3200 -97.3300 251.000 457.0 184.287 5.830 -999.990 -999.990 1.843 ..P WKT 2010 08 29 12 14 55 31.3200 -97.3300 251.000 457.0 176.565 4.950 -999.990 -999.990 1.766 ..P WKT 2010 08 29 12 19 55 31.3200 -97.3300 251.000 30.0 209.596 4.920 -999.990 -999.990 2.096 ..P WKT 2010 08 29 12 24 55 31.3200 -97.3300 251.000 122.0 175.720 4.440 -999.990 -999.990 1.757 ..P WKT 2010 08 29 12 29 55 31.3200 -97.3300 251.000 457.0 189.222 4.880 -999.990 -999.990 1.892 ..P WKT 2010 08 29 12 34 55 31.3200 -97.3300 251.000 30.0 204.943 4.420 -999.990 -999.990 2.049 ..P WKT 2010 08 29 12 39 55 31.3200 -97.3300 251.000 122.0 175.907 4.510 -999.990 -999.990 1.759 ..P WKT 2010 08 29 12 44 55 31.3200 -97.3300 251.000 457.0 174.584 5.010 -999.990 -999.990 1.746 ..P WKT 2010 08 29 12 54 55 31.3200 -97.3300 251.000 30.0 206.914 5.030 -999.990 -999.990 2.069 ..P WKT 2010 08 29 12 59 55 31.3200 -97.3300 251.000 122.0 177.362 4.930 -999.990 -999.990 1.774 ..P WKT 2010 08 29 13 04 55 31.3200 -97.3300 251.000 457.0 167.214 4.180 -999.990 -999.990 1.672 ..P WKT 2010 08 29 13 09 55 31.3200 -97.3300 251.000 30.0 205.591 4.830 -999.990 -999.990 2.056 ..P WKT 2010 08 29 13 14 55 31.3200 -97.3300 251.000 122.0 180.606 4.460 -999.990 -999.990 1.806 ..P WKT 2010 08 29 13 19 55 31.3200 -97.3300 251.000 457.0 169.069 4.650 -999.990 -999.990 1.691 ..P WKT 2010 08 29 13 29 55 31.3200 -97.3300 251.000 30.0 204.043 4.230 -999.990 -999.990 2.040 ..P WKT 2010 08 29 13 34 55 31.3200 -97.3300 251.000 122.0 184.678 4.810 -999.990 -999.990 1.847 ..P WKT 2010 08 29 13 39 55 31.3200 -97.3300 251.000 457.0 164.893 4.350 -999.990 -999.990 1.649 ..P WKT 2010 08 29 13 44 55 31.3200 -97.3300 251.000 30.0 216.136 5.610 -999.990 -999.990 2.161 ..P WKT 2010 08 29 13 49 55 31.3200 -97.3300 251.000 122.0 194.824 5.060 -999.990 -999.990 1.948 ..P WKT 2010 08 29 13 54 55 31.3200 -97.3300 251.000 457.0 166.154 5.430 -999.990 -999.990 1.662 ..P WKT 2010 08 29 14 04 55 31.3200 -97.3300 251.000 30.0 203.390 4.150 -999.990 -999.990 2.034 ..P WKT 2010 08 29 14 09 55 31.3200 -97.3300 251.000 122.0 200.330 4.320 -999.990 -999.990 2.003 ..P WKT 2010 08 29 14 14 55 31.3200 -97.3300 251.000 457.0 168.399 4.380 -999.990 -999.990 1.684 ..P WKT 2010 08 29 14 19 55 31.3200 -97.3300 251.000 30.0 201.984 4.270 -999.990 -999.990 2.020 ..P WKT 2010 08 29 14 24 55 31.3200 -97.3300 251.000 122.0 205.033 4.120 -999.990 -999.990 2.050 ..P WKT 2010 08 29 14 29 55 31.3200 -97.3300 251.000 457.0 163.096 4.260 -999.990 -999.990 1.631 ..P WKT 2010 08 29 14 39 55 31.3200 -97.3300 251.000 30.0 199.740 4.130 -999.990 -999.990 1.997 ..P WKT 2010 08 29 14 44 55 31.3200 -97.3300 251.000 122.0 198.344 3.830 -999.990 -999.990 1.983 ..P WKT 2010 08 29 14 49 55 31.3200 -97.3300 251.000 457.0 164.449 4.940 -999.990 -999.990 1.644 ..P WKT 2010 08 29 14 54 55 31.3200 -97.3300 251.000 30.0 187.220 3.910 -999.990 -999.990 1.872 ..P WKT 2010 08 29 14 59 55 31.3200 -97.3300 251.000 122.0 183.601 3.840 -999.990 -999.990 1.836 ..P WKT 2010 08 29 15 04 55 31.3200 -97.3300 251.000 457.0 143.859 5.620 -999.990 -999.990 1.439 ..P WKT 2010 08 29 15 14 55 31.3200 -97.3300 251.000 30.0 169.524 3.520 -999.990 -999.990 1.695 ..P WKT 2010 08 29 15 19 55 31.3200 -97.3300 251.000 122.0 176.306 3.700 -999.990 -999.990 1.763 ..P WKT 2010 08 29 15 24 55 31.3200 -97.3300 251.000 457.0 169.190 4.570 -999.990 -999.990 1.692 ..P WKT 2010 08 29 15 29 55 31.3200 -97.3300 251.000 30.0 165.686 3.720 -999.990 -999.990 1.657 ..P WKT 2010 08 29 15 34 55 31.3200 -97.3300 251.000 122.0 171.912 3.770 -999.990 -999.990 1.719 ..P WKT 2010 08 29 15 39 55 31.3200 -97.3300 251.000 457.0 163.683 4.410 -999.990 -999.990 1.637 ..P WKT 2010 08 29 15 49 55 31.3200 -97.3300 251.000 30.0 162.671 4.450 -999.990 -999.990 1.627 ..P WKT 2010 08 29 15 54 55 31.3200 -97.3300 251.000 122.0 172.395 4.250 -999.990 -999.990 1.724 ..P WKT 2010 08 29 15 59 55 31.3200 -97.3300 251.000 457.0 160.427 5.380 -999.990 -999.990 1.604 ..P WKT 2010 08 29 16 04 55 31.3200 -97.3300 251.000 30.0 156.524 4.160 -999.990 -999.990 1.565 ..P WKT 2010 08 29 16 09 55 31.3200 -97.3300 251.000 122.0 176.265 4.560 -999.990 -999.990 1.763 ..P WKT 2010 08 29 16 14 55 31.3200 -97.3300 251.000 457.0 158.730 5.630 -999.990 -999.990 1.587 ..P WKT 2010 08 29 16 24 55 31.3200 -97.3300 251.000 30.0 150.622 4.400 -999.990 -999.990 1.506 ..P WKT 2010 08 29 16 29 55 31.3200 -97.3300 251.000 122.0 162.279 4.280 -999.990 -999.990 1.623 ..P WKT 2010 08 29 16 34 55 31.3200 -97.3300 251.000 457.0 157.658 4.860 -999.990 -999.990 1.577 ..P WKT 2010 08 29 16 39 55 31.3200 -97.3300 251.000 30.0 149.418 3.850 -999.990 -999.990 1.494 ..P WKT 2010 08 29 16 44 55 31.3200 -97.3300 251.000 122.0 154.816 3.580 -999.990 -999.990 1.548 ..P WKT 2010 08 29 16 49 55 31.3200 -97.3300 251.000 457.0 148.662 4.520 -999.990 -999.990 1.487 ..P WKT 2010 08 29 17 04 55 31.3200 -97.3300 251.000 30.0 136.995 4.850 -999.990 -999.990 1.370 ..P WKT 2010 08 29 17 09 55 31.3200 -97.3300 251.000 122.0 145.586 4.840 -999.990 -999.990 1.456 ..P WKT 2010 08 29 17 14 55 31.3200 -97.3300 251.000 457.0 126.469 3.570 -999.990 -999.990 1.265 ..P WKT 2010 08 29 17 19 55 31.3200 -97.3300 251.000 30.0 123.084 3.160 -999.990 -999.990 1.231 ..P WKT 2010 08 29 17 24 55 31.3200 -97.3300 251.000 122.0 134.602 3.570 -999.990 -999.990 1.346 ..P WKT 2010 08 29 17 29 55 31.3200 -97.3300 251.000 457.0 124.253 4.010 -999.990 -999.990 1.243 ..P WKT 2010 08 29 17 39 55 31.3200 -97.3300 251.000 30.0 123.183 3.490 -999.990 -999.990 1.232 ..P WKT 2010 08 29 17 44 55 31.3200 -97.3300 251.000 122.0 134.694 3.100 -999.990 -999.990 1.347 ..P WKT 2010 08 29 17 49 55 31.3200 -97.3300 251.000 457.0 123.078 3.590 -999.990 -999.990 1.231 ..P WKT 2010 08 29 17 54 55 31.3200 -97.3300 251.000 30.0 117.312 4.360 -999.990 -999.990 1.173 ..P WKT 2010 08 29 17 59 55 31.3200 -97.3300 251.000 122.0 121.719 4.380 -999.990 -999.990 1.217 ..P WKT 2010 08 29 18 04 55 31.3200 -97.3300 251.000 457.0 111.214 3.630 -999.990 -999.990 1.112 ..P WKT 2010 08 29 18 14 55 31.3200 -97.3300 251.000 30.0 115.886 3.360 -999.990 -999.990 1.159 ..P WKT 2010 08 29 18 19 55 31.3200 -97.3300 251.000 122.0 127.024 3.740 -999.990 -999.990 1.270 ..P WKT 2010 08 29 18 24 55 31.3200 -97.3300 251.000 457.0 115.580 5.920 -999.990 -999.990 1.156 ..P WKT 2010 08 29 18 29 55 31.3200 -97.3300 251.000 30.0 111.105 5.370 -999.990 -999.990 1.111 ..P WKT 2010 08 29 18 34 55 31.3200 -97.3300 251.000 122.0 118.063 4.460 -999.990 -999.990 1.181 ..P WKT 2010 08 29 18 39 55 31.3200 -97.3300 251.000 457.0 103.267 3.810 -999.990 -999.990 1.033 ..P WKT 2010 08 29 18 49 55 31.3200 -97.3300 251.000 30.0 104.793 4.090 -999.990 -999.990 1.048 ..P WKT 2010 08 29 18 54 55 31.3200 -97.3300 251.000 122.0 105.775 4.400 -999.990 -999.990 1.058 ..P WKT 2010 08 29 18 59 55 31.3200 -97.3300 251.000 457.0 107.873 5.730 -999.990 -999.990 1.079 ..P WKT 2010 08 29 19 04 55 31.3200 -97.3300 251.000 30.0 99.927 4.590 -999.990 -999.990 0.999 ..P WKT 2010 08 29 19 09 55 31.3200 -97.3300 251.000 122.0 107.048 5.120 -999.990 -999.990 1.070 ..P WKT 2010 08 29 19 14 55 31.3200 -97.3300 251.000 457.0 106.635 5.010 -999.990 -999.990 1.066 ..P WKT 2010 08 29 19 24 55 31.3200 -97.3300 251.000 30.0 111.432 4.830 -999.990 -999.990 1.114 ..P WKT 2010 08 29 19 29 55 31.3200 -97.3300 251.000 122.0 115.525 5.460 -999.990 -999.990 1.155 ..P WKT 2010 08 29 19 34 55 31.3200 -97.3300 251.000 457.0 104.544 3.910 -999.990 -999.990 1.045 ..P WKT 2010 08 29 19 39 55 31.3200 -97.3300 251.000 30.0 106.964 3.240 -999.990 -999.990 1.070 ..P WKT 2010 08 29 19 44 55 31.3200 -97.3300 251.000 122.0 116.921 3.780 -999.990 -999.990 1.169 ..P WKT 2010 08 29 19 49 55 31.3200 -97.3300 251.000 457.0 106.217 2.610 -999.990 -999.990 1.062 ..P WKT 2010 08 29 19 59 55 31.3200 -97.3300 251.000 30.0 105.989 3.320 -999.990 -999.990 1.060 ..P WKT 2010 08 29 20 04 55 31.3200 -97.3300 251.000 122.0 114.793 4.170 -999.990 -999.990 1.148 ..P WKT 2010 08 29 20 09 55 31.3200 -97.3300 251.000 457.0 105.023 3.000 -999.990 -999.990 1.050 ..P WKT 2010 08 29 20 14 55 31.3200 -97.3300 251.000 30.0 107.264 3.310 -999.990 -999.990 1.073 ..P WKT 2010 08 29 20 19 55 31.3200 -97.3300 251.000 122.0 113.696 3.450 -999.990 -999.990 1.137 ..P WKT 2010 08 29 20 24 55 31.3200 -97.3300 251.000 457.0 114.819 2.780 -999.990 -999.990 1.148 ..P WKT 2010 08 29 20 34 55 31.3200 -97.3300 251.000 30.0 107.128 2.880 -999.990 -999.990 1.071 ..P WKT 2010 08 29 20 39 55 31.3200 -97.3300 251.000 122.0 111.166 3.480 -999.990 -999.990 1.112 ..P WKT 2010 08 29 20 44 55 31.3200 -97.3300 251.000 457.0 105.143 3.520 -999.990 -999.990 1.051 ..P WKT 2010 08 29 20 49 55 31.3200 -97.3300 251.000 30.0 97.861 3.180 -999.990 -999.990 0.979 ..P WKT 2010 08 29 20 54 55 31.3200 -97.3300 251.000 122.0 112.102 3.000 -999.990 -999.990 1.121 ..P WKT 2010 08 29 20 59 55 31.3200 -97.3300 251.000 457.0 100.067 3.070 -999.990 -999.990 1.001 ..P WKT 2010 08 29 21 09 55 31.3200 -97.3300 251.000 30.0 100.817 2.850 -999.990 -999.990 1.008 ..P WKT 2010 08 29 21 14 55 31.3200 -97.3300 251.000 122.0 108.013 4.330 -999.990 -999.990 1.080 ..P WKT 2010 08 29 21 19 55 31.3200 -97.3300 251.000 457.0 101.506 3.200 -999.990 -999.990 1.015 ..P WKT 2010 08 29 21 24 55 31.3200 -97.3300 251.000 30.0 99.894 2.850 -999.990 -999.990 0.999 ..P WKT 2010 08 29 21 29 55 31.3200 -97.3300 251.000 122.0 107.092 2.420 -999.990 -999.990 1.071 ..P WKT 2010 08 29 21 34 55 31.3200 -97.3300 251.000 457.0 103.381 2.870 -999.990 -999.990 1.034 ..P WKT 2010 08 29 21 44 55 31.3200 -97.3300 251.000 30.0 100.534 2.320 -999.990 -999.990 1.005 ..P WKT 2010 08 29 21 49 55 31.3200 -97.3300 251.000 122.0 113.011 2.730 -999.990 -999.990 1.130 ..P WKT 2010 08 29 21 54 55 31.3200 -97.3300 251.000 457.0 105.342 3.740 -999.990 -999.990 1.053 ..P WKT 2010 08 29 21 59 55 31.3200 -97.3300 251.000 30.0 102.849 3.200 -999.990 -999.990 1.028 ..P WKT 2010 08 29 22 04 55 31.3200 -97.3300 251.000 122.0 111.271 2.690 -999.990 -999.990 1.113 ..P WKT 2010 08 29 22 09 55 31.3200 -97.3300 251.000 457.0 108.778 2.620 -999.990 -999.990 1.088 ..P WKT 2010 08 29 22 19 55 31.3200 -97.3300 251.000 30.0 94.592 2.550 -999.990 -999.990 0.946 ..P WKT 2010 08 29 22 24 55 31.3200 -97.3300 251.000 122.0 107.536 2.810 -999.990 -999.990 1.075 ..P WKT 2010 08 29 22 29 55 31.3200 -97.3300 251.000 457.0 96.402 3.060 -999.990 -999.990 0.964 ..P WKT 2010 08 29 22 34 55 31.3200 -97.3300 251.000 30.0 99.828 2.550 -999.990 -999.990 0.998 ..P WKT 2010 08 29 22 39 55 31.3200 -97.3300 251.000 122.0 106.614 2.340 -999.990 -999.990 1.066 ..P WKT 2010 08 29 22 44 55 31.3200 -97.3300 251.000 457.0 98.837 2.610 -999.990 -999.990 0.988 ..P WKT 2010 08 29 22 54 55 31.3200 -97.3300 251.000 30.0 91.524 2.020 -999.990 -999.990 0.915 ..P WKT 2010 08 29 22 59 55 31.3200 -97.3300 251.000 122.0 103.475 2.760 -999.990 -999.990 1.035 ..P WKT 2010 08 29 23 04 55 31.3200 -97.3300 251.000 457.0 99.458 2.370 -999.990 -999.990 0.995 ..P WKT 2010 08 29 23 09 55 31.3200 -97.3300 251.000 30.0 98.803 1.800 -999.990 -999.990 0.988 ..P WKT 2010 08 29 23 14 55 31.3200 -97.3300 251.000 122.0 104.593 2.140 -999.990 -999.990 1.046 ..P WKT 2010 08 29 23 19 55 31.3200 -97.3300 251.000 457.0 102.537 1.930 -999.990 -999.990 1.025 ..P WKT 2010 08 29 23 29 55 31.3200 -97.3300 251.000 30.0 97.756 2.880 -999.990 -999.990 0.978 ..P WKT 2010 08 29 23 34 55 31.3200 -97.3300 251.000 122.0 109.046 2.200 -999.990 -999.990 1.090 ..P WKT 2010 08 29 23 39 55 31.3200 -97.3300 251.000 457.0 99.313 2.990 -999.990 -999.990 0.993 ..P WKT 2010 08 29 23 44 55 31.3200 -97.3300 251.000 30.0 102.755 3.620 -999.990 -999.990 1.028 ..P WKT 2010 08 29 23 49 55 31.3200 -97.3300 251.000 122.0 106.478 4.170 -999.990 -999.990 1.065 ..P WKT 2010 08 30 00 09 55 31.3200 -97.3300 251.000 457.0 99.520 3.210 -999.990 -999.990 0.995 ..P WKT 2010 08 30 00 10 25 31.3200 -97.3300 251.000 457.0 101.752 3.200 -999.990 -999.990 1.018 ..P WKT 2010 08 30 00 10 55 31.3200 -97.3300 251.000 457.0 97.675 4.000 -999.990 -999.990 0.977 ..P WKT 2010 08 30 00 11 25 31.3200 -97.3300 251.000 457.0 102.151 3.780 -999.990 -999.990 1.022 ..P WKT 2010 08 30 00 11 55 31.3200 -97.3300 251.000 457.0 104.383 3.810 -999.990 -999.990 1.044 ..P WKT 2010 08 30 00 12 25 31.3200 -97.3300 251.000 457.0 101.147 3.250 -999.990 -999.990 1.011 ..P WKT 2010 08 30 00 12 55 31.3200 -97.3300 251.000 457.0 100.715 3.220 -999.990 -999.990 1.007 ..P WKT 2010 08 30 00 13 25 31.3200 -97.3300 251.000 457.0 100.844 5.040 -999.990 -999.990 1.008 ..P WKT 2010 08 30 00 13 55 31.3200 -97.3300 251.000 457.0 110.226 3.800 -999.990 -999.990 1.102 ..P WKT 2010 08 30 00 14 25 31.3200 -97.3300 251.000 457.0 105.167 3.480 -999.990 -999.990 1.052 ..P WKT 2010 08 30 00 14 55 31.3200 -97.3300 251.000 457.0 105.016 3.900 -999.990 -999.990 1.050 ..P WKT 2010 08 30 00 19 55 31.3200 -97.3300 251.000 30.0 108.549 4.350 -999.990 -999.990 1.085 ..P WKT 2010 08 30 00 24 55 31.3200 -97.3300 251.000 122.0 118.528 5.070 -999.990 -999.990 1.185 ..P WKT 2010 08 30 00 29 55 31.3200 -97.3300 251.000 457.0 109.867 6.280 -999.990 -999.990 1.099 ..P WKT 2010 08 30 00 34 55 31.3200 -97.3300 251.000 30.0 109.754 5.930 -999.990 -999.990 1.098 ..P WKT 2010 08 30 00 39 55 31.3200 -97.3300 251.000 122.0 118.749 5.420 -999.990 -999.990 1.187 ..P WKT 2010 08 30 00 44 55 31.3200 -97.3300 251.000 457.0 113.873 3.210 -999.990 -999.990 1.139 ..P WKT 2010 08 30 00 54 55 31.3200 -97.3300 251.000 30.0 116.522 4.090 -999.990 -999.990 1.165 ..P WKT 2010 08 30 00 59 55 31.3200 -97.3300 251.000 122.0 114.662 5.490 -999.990 -999.990 1.147 ..P WKT 2010 08 30 01 04 55 31.3200 -97.3300 251.000 457.0 108.742 6.080 -999.990 -999.990 1.087 ..P WKT 2010 08 30 01 09 55 31.3200 -97.3300 251.000 30.0 110.383 5.010 -999.990 -999.990 1.104 ..P WKT 2010 08 30 01 14 55 31.3200 -97.3300 251.000 122.0 112.024 4.350 -999.990 -999.990 1.120 ..P WKT 2010 08 30 01 19 55 31.3200 -97.3300 251.000 457.0 107.926 3.290 -999.990 -999.990 1.079 ..P WKT 2010 08 30 01 29 55 31.3200 -97.3300 251.000 30.0 113.867 3.180 -999.990 -999.990 1.139 ..P WKT 2010 08 30 01 34 55 31.3200 -97.3300 251.000 122.0 141.673 4.430 -999.990 -999.990 1.417 ..P WKT 2010 08 30 01 39 55 31.3200 -97.3300 251.000 457.0 143.450 4.980 -999.990 -999.990 1.434 ..P WKT 2010 08 30 01 44 55 31.3200 -97.3300 251.000 30.0 141.589 5.070 -999.990 -999.990 1.416 ..P WKT 2010 08 30 01 49 55 31.3200 -97.3300 251.000 122.0 138.469 4.440 -999.990 -999.990 1.385 ..P WKT 2010 08 30 01 54 55 31.3200 -97.3300 251.000 457.0 121.923 3.130 -999.990 -999.990 1.219 ..P WKT 2010 08 30 02 04 55 31.3200 -97.3300 251.000 30.0 113.213 3.510 -999.990 -999.990 1.132 ..P WKT 2010 08 30 02 09 55 31.3200 -97.3300 251.000 122.0 114.193 3.870 -999.990 -999.990 1.142 ..P WKT 2010 08 30 02 14 55 31.3200 -97.3300 251.000 457.0 96.160 4.200 -999.990 -999.990 0.962 ..P WKT 2010 08 30 02 19 55 31.3200 -97.3300 251.000 30.0 105.248 6.130 -999.990 -999.990 1.052 ..P WKT 2010 08 30 02 24 55 31.3200 -97.3300 251.000 122.0 106.229 4.390 -999.990 -999.990 1.062 ..P WKT 2010 08 30 02 29 55 31.3200 -97.3300 251.000 457.0 85.687 3.300 -999.990 -999.990 0.857 ..P WKT 2010 08 30 02 39 55 31.3200 -97.3300 251.000 30.0 90.644 3.530 -999.990 -999.990 0.906 ..P WKT 2010 08 30 02 44 55 31.3200 -97.3300 251.000 122.0 96.296 4.370 -999.990 -999.990 0.963 ..P WKT 2010 08 30 02 49 55 31.3200 -97.3300 251.000 457.0 113.401 5.160 -999.990 -999.990 1.134 ..P WKT 2010 08 30 02 54 55 31.3200 -97.3300 251.000 30.0 89.438 3.890 -999.990 -999.990 0.894 ..P WKT 2010 08 30 02 59 55 31.3200 -97.3300 251.000 122.0 99.836 5.060 -999.990 -999.990 0.998 ..P WKT 2010 08 30 03 04 55 31.3200 -97.3300 251.000 457.0 118.890 2.870 -999.990 -999.990 1.189 ..P WKT 2010 08 30 03 14 55 31.3200 -97.3300 251.000 30.0 97.789 2.800 -999.990 -999.990 0.978 ..P WKT 2010 08 30 03 19 55 31.3200 -97.3300 251.000 122.0 102.318 3.130 -999.990 -999.990 1.023 ..P WKT 2010 08 30 03 24 55 31.3200 -97.3300 251.000 457.0 94.284 3.550 -999.990 -999.990 0.943 ..P WKT 2010 08 30 03 29 55 31.3200 -97.3300 251.000 30.0 92.393 4.040 -999.990 -999.990 0.924 ..P WKT 2010 08 30 03 34 55 31.3200 -97.3300 251.000 122.0 100.550 3.390 -999.990 -999.990 1.006 ..P WKT 2010 08 30 03 39 55 31.3200 -97.3300 251.000 457.0 86.938 3.200 -999.990 -999.990 0.869 ..P WKT 2010 08 30 03 49 55 31.3200 -97.3300 251.000 30.0 91.868 3.210 -999.990 -999.990 0.919 ..P WKT 2010 08 30 03 54 55 31.3200 -97.3300 251.000 122.0 99.802 3.370 -999.990 -999.990 0.998 ..P WKT 2010 08 30 03 59 55 31.3200 -97.3300 251.000 457.0 83.049 2.950 -999.990 -999.990 0.830 ..P WKT 2010 08 30 04 04 55 31.3200 -97.3300 251.000 30.0 93.910 4.130 -999.990 -999.990 0.939 ..P WKT 2010 08 30 04 09 55 31.3200 -97.3300 251.000 122.0 94.591 4.150 -999.990 -999.990 0.946 ..P WKT 2010 08 30 04 14 55 31.3200 -97.3300 251.000 457.0 78.958 3.010 -999.990 -999.990 0.790 ..P WKT 2010 08 30 04 24 55 31.3200 -97.3300 251.000 30.0 91.613 3.850 -999.990 -999.990 0.916 ..P WKT 2010 08 30 04 29 55 31.3200 -97.3300 251.000 122.0 97.171 3.220 -999.990 -999.990 0.972 ..P WKT 2010 08 30 04 34 55 31.3200 -97.3300 251.000 457.0 75.274 3.860 -999.990 -999.990 0.753 ..P WKT 2010 08 30 04 39 55 31.3200 -97.3300 251.000 30.0 96.579 3.050 -999.990 -999.990 0.966 ..P WKT 2010 08 30 04 44 55 31.3200 -97.3300 251.000 122.0 99.070 3.260 -999.990 -999.990 0.991 ..P WKT 2010 08 30 04 49 55 31.3200 -97.3300 251.000 457.0 75.091 2.700 -999.990 -999.990 0.751 ..P WKT 2010 08 30 05 04 55 31.3200 -97.3300 251.000 30.0 89.774 2.660 -999.990 -999.990 0.898 ..P WKT 2010 08 30 05 09 55 31.3200 -97.3300 251.000 122.0 97.748 3.220 -999.990 -999.990 0.977 ..P WKT 2010 08 30 05 14 55 31.3200 -97.3300 251.000 457.0 75.504 4.750 -999.990 -999.990 0.755 ..P WKT 2010 08 30 05 19 55 31.3200 -97.3300 251.000 30.0 90.717 4.660 -999.990 -999.990 0.907 ..P WKT 2010 08 30 05 24 55 31.3200 -97.3300 251.000 122.0 88.386 4.950 -999.990 -999.990 0.884 ..P WKT 2010 08 30 05 29 55 31.3200 -97.3300 251.000 457.0 74.503 3.210 -999.990 -999.990 0.745 ..P WKT 2010 08 30 05 39 55 31.3200 -97.3300 251.000 30.0 82.995 2.970 -999.990 -999.990 0.830 ..P WKT 2010 08 30 05 44 55 31.3200 -97.3300 251.000 122.0 92.283 4.510 -999.990 -999.990 0.923 ..P WKT 2010 08 30 05 49 55 31.3200 -97.3300 251.000 457.0 76.664 5.020 -999.990 -999.990 0.767 ..P WKT 2010 08 30 05 54 55 31.3200 -97.3300 251.000 30.0 91.375 5.850 -999.990 -999.990 0.914 ..P WKT 2010 08 30 05 59 55 31.3200 -97.3300 251.000 122.0 96.624 4.920 -999.990 -999.990 0.966 ..P WKT 2010 08 30 06 04 55 31.3200 -97.3300 251.000 457.0 82.401 3.950 -999.990 -999.990 0.824 ..P WKT 2010 08 30 06 14 55 31.3200 -97.3300 251.000 30.0 93.474 3.280 -999.990 -999.990 0.935 ..P WKT 2010 08 30 06 19 55 31.3200 -97.3300 251.000 122.0 97.906 4.930 -999.990 -999.990 0.979 ..P WKT 2010 08 30 06 24 55 31.3200 -97.3300 251.000 457.0 88.158 5.880 -999.990 -999.990 0.882 ..P WKT 2010 08 30 06 29 55 31.3200 -97.3300 251.000 30.0 96.204 4.850 -999.990 -999.990 0.962 ..P WKT 2010 08 30 06 34 55 31.3200 -97.3300 251.000 122.0 95.075 3.900 -999.990 -999.990 0.951 ..P WKT 2010 08 30 06 39 55 31.3200 -97.3300 251.000 457.0 88.943 3.930 -999.990 -999.990 0.889 ..P WKT 2010 08 30 06 49 55 31.3200 -97.3300 251.000 30.0 87.402 2.670 -999.990 -999.990 0.874 ..P WKT 2010 08 30 06 54 55 31.3200 -97.3300 251.000 122.0 91.991 3.590 -999.990 -999.990 0.920 ..P WKT 2010 08 30 06 59 55 31.3200 -97.3300 251.000 457.0 81.854 4.430 -999.990 -999.990 0.819 ..P WKT 2010 08 30 07 04 55 31.3200 -97.3300 251.000 30.0 81.997 4.170 -999.990 -999.990 0.820 ..P WKT 2010 08 30 07 09 55 31.3200 -97.3300 251.000 122.0 91.306 4.130 -999.990 -999.990 0.913 ..P WKT 2010 08 30 07 14 55 31.3200 -97.3300 251.000 457.0 92.837 2.780 -999.990 -999.990 0.928 ..P WKT 2010 08 30 07 24 55 31.3200 -97.3300 251.000 30.0 86.636 2.950 -999.990 -999.990 0.866 ..P WKT 2010 08 30 07 29 55 31.3200 -97.3300 251.000 122.0 95.563 3.960 -999.990 -999.990 0.956 ..P WKT 2010 08 30 07 34 55 31.3200 -97.3300 251.000 457.0 80.616 5.570 -999.990 -999.990 0.806 ..P WKT 2010 08 30 07 39 55 31.3200 -97.3300 251.000 30.0 82.880 4.450 -999.990 -999.990 0.829 ..P WKT 2010 08 30 07 44 55 31.3200 -97.3300 251.000 122.0 86.255 3.870 -999.990 -999.990 0.863 ..P WKT 2010 08 30 07 49 55 31.3200 -97.3300 251.000 457.0 76.724 4.480 -999.990 -999.990 0.767 ..P WKT 2010 08 30 07 59 55 31.3200 -97.3300 251.000 30.0 68.767 4.170 -999.990 -999.990 0.688 ..P WKT 2010 08 30 08 04 55 31.3200 -97.3300 251.000 122.0 78.800 3.860 -999.990 -999.990 0.788 ..P WKT 2010 08 30 08 09 55 31.3200 -97.3300 251.000 457.0 77.458 4.980 -999.990 -999.990 0.775 ..P WKT 2010 08 30 08 14 55 31.3200 -97.3300 251.000 30.0 79.998 3.600 -999.990 -999.990 0.800 ..P WKT 2010 08 30 08 19 55 31.3200 -97.3300 251.000 122.0 88.778 3.650 -999.990 -999.990 0.888 ..P WKT 2010 08 30 08 24 55 31.3200 -97.3300 251.000 457.0 80.919 3.140 -999.990 -999.990 0.809 ..P WKT 2010 08 30 08 34 55 31.3200 -97.3300 251.000 30.0 81.363 4.000 -999.990 -999.990 0.814 ..P WKT 2010 08 30 08 39 55 31.3200 -97.3300 251.000 122.0 90.634 3.700 -999.990 -999.990 0.906 ..P WKT 2010 08 30 08 44 55 31.3200 -97.3300 251.000 457.0 86.460 3.140 -999.990 -999.990 0.865 ..P WKT 2010 08 30 08 49 55 31.3200 -97.3300 251.000 30.0 84.504 3.780 -999.990 -999.990 0.845 ..P WKT 2010 08 30 08 54 55 31.3200 -97.3300 251.000 122.0 85.736 3.030 -999.990 -999.990 0.857 ..P WKT 2010 08 30 08 59 55 31.3200 -97.3300 251.000 457.0 83.503 3.420 -999.990 -999.990 0.835 ..P WKT 2010 08 30 09 09 55 31.3200 -97.3300 251.000 30.0 86.539 3.810 -999.990 -999.990 0.865 ..P WKT 2010 08 30 09 14 55 31.3200 -97.3300 251.000 122.0 92.498 3.490 -999.990 -999.990 0.925 ..P WKT 2010 08 30 09 19 55 31.3200 -97.3300 251.000 457.0 85.024 3.910 -999.990 -999.990 0.850 ..P WKT 2010 08 30 09 24 55 31.3200 -97.3300 251.000 30.0 79.352 3.580 -999.990 -999.990 0.794 ..P WKT 2010 08 30 09 29 55 31.3200 -97.3300 251.000 122.0 88.078 3.490 -999.990 -999.990 0.881 ..P WKT 2010 08 30 09 34 55 31.3200 -97.3300 251.000 457.0 81.576 4.110 -999.990 -999.990 0.816 ..P WKT 2010 08 30 09 44 55 31.3200 -97.3300 251.000 30.0 73.913 3.790 -999.990 -999.990 0.739 ..P WKT 2010 08 30 09 49 55 31.3200 -97.3300 251.000 122.0 85.483 3.600 -999.990 -999.990 0.855 ..P WKT 2010 08 30 09 54 55 31.3200 -97.3300 251.000 457.0 77.957 3.740 -999.990 -999.990 0.780 ..P WKT 2010 08 30 09 59 55 31.3200 -97.3300 251.000 30.0 78.456 2.720 -999.990 -999.990 0.785 ..P WKT 2010 08 30 10 04 55 31.3200 -97.3300 251.000 122.0 83.104 2.860 -999.990 -999.990 0.831 ..P WKT 2010 08 30 10 09 55 31.3200 -97.3300 251.000 457.0 70.325 3.310 -999.990 -999.990 0.703 ..P WKT 2010 08 30 10 19 55 31.3200 -97.3300 251.000 30.0 82.742 2.270 -999.990 -999.990 0.827 ..P WKT 2010 08 30 10 24 55 31.3200 -97.3300 251.000 122.0 85.531 2.660 -999.990 -999.990 0.855 ..P WKT 2010 08 30 10 29 55 31.3200 -97.3300 251.000 457.0 85.002 3.980 -999.990 -999.990 0.850 ..P WKT 2010 08 30 10 34 55 31.3200 -97.3300 251.000 30.0 85.855 3.000 -999.990 -999.990 0.859 ..P WKT 2010 08 30 10 39 55 31.3200 -97.3300 251.000 122.0 83.667 3.070 -999.990 -999.990 0.837 ..P WKT 2010 08 30 10 44 55 31.3200 -97.3300 251.000 457.0 81.756 3.180 -999.990 -999.990 0.818 ..P WKT 2010 08 30 10 54 55 31.3200 -97.3300 251.000 30.0 84.016 4.310 -999.990 -999.990 0.840 ..P WKT 2010 08 30 10 59 55 31.3200 -97.3300 251.000 122.0 91.500 3.240 -999.990 -999.990 0.915 ..P WKT 2010 08 30 11 04 55 31.3200 -97.3300 251.000 457.0 76.051 3.680 -999.990 -999.990 0.761 ..P WKT 2010 08 30 11 09 55 31.3200 -97.3300 251.000 30.0 79.391 3.850 -999.990 -999.990 0.794 ..P WKT 2010 08 30 11 14 55 31.3200 -97.3300 251.000 122.0 83.559 2.850 -999.990 -999.990 0.836 ..P WKT 2010 08 30 11 19 55 31.3200 -97.3300 251.000 457.0 77.506 3.360 -999.990 -999.990 0.775 ..P WKT 2010 08 30 11 29 55 31.3200 -97.3300 251.000 30.0 83.953 3.340 -999.990 -999.990 0.840 ..P WKT 2010 08 30 11 34 55 31.3200 -97.3300 251.000 122.0 80.435 3.810 -999.990 -999.990 0.804 ..P WKT 2010 08 30 11 39 55 31.3200 -97.3300 251.000 457.0 74.984 3.540 -999.990 -999.990 0.750 ..P WKT 2010 08 30 11 44 55 31.3200 -97.3300 251.000 30.0 88.720 3.890 -999.990 -999.990 0.887 ..P WKT 2010 08 30 11 49 55 31.3200 -97.3300 251.000 122.0 86.445 2.830 -999.990 -999.990 0.864 ..P WKT 2010 08 30 12 09 55 31.3200 -97.3300 251.000 457.0 82.481 3.470 -999.990 -999.990 0.825 ..P WKT 2010 08 30 12 10 25 31.3200 -97.3300 251.000 457.0 80.670 2.900 -999.990 -999.990 0.807 ..P WKT 2010 08 30 12 10 55 31.3200 -97.3300 251.000 457.0 75.409 4.340 -999.990 -999.990 0.754 ..P WKT 2010 08 30 12 11 25 31.3200 -97.3300 251.000 457.0 74.839 5.310 -999.990 -999.990 0.748 ..P WKT 2010 08 30 12 11 55 31.3200 -97.3300 251.000 457.0 83.789 2.940 -999.990 -999.990 0.838 ..P WKT 2010 08 30 12 12 25 31.3200 -97.3300 251.000 457.0 82.254 3.160 -999.990 -999.990 0.823 ..P WKT 2010 08 30 12 12 55 31.3200 -97.3300 251.000 457.0 84.306 2.690 -999.990 -999.990 0.843 ..P WKT 2010 08 30 12 13 25 31.3200 -97.3300 251.000 457.0 81.252 3.570 -999.990 -999.990 0.813 ..P WKT 2010 08 30 12 13 55 31.3200 -97.3300 251.000 457.0 76.957 2.560 -999.990 -999.990 0.770 ..P WKT 2010 08 30 12 14 25 31.3200 -97.3300 251.000 457.0 79.008 2.790 -999.990 -999.990 0.790 ..P WKT 2010 08 30 12 14 55 31.3200 -97.3300 251.000 457.0 77.059 2.610 -999.990 -999.990 0.771 ..P WKT 2010 08 30 12 19 55 31.3200 -97.3300 251.000 30.0 90.400 2.820 -999.990 -999.990 0.904 ..P WKT 2010 08 30 12 24 55 31.3200 -97.3300 251.000 122.0 91.876 2.930 -999.990 -999.990 0.919 ..P WKT 2010 08 30 12 29 55 31.3200 -97.3300 251.000 457.0 79.281 3.380 -999.990 -999.990 0.793 ..P WKT 2010 08 30 12 34 55 31.3200 -97.3300 251.000 30.0 88.759 2.510 -999.990 -999.990 0.888 ..P WKT 2010 08 30 12 39 55 31.3200 -97.3300 251.000 122.0 86.510 3.080 -999.990 -999.990 0.865 ..P WKT 2010 08 30 12 44 55 31.3200 -97.3300 251.000 457.0 78.468 2.310 -999.990 -999.990 0.785 ..P WKT 2010 08 30 12 54 55 31.3200 -97.3300 251.000 30.0 88.229 3.240 -999.990 -999.990 0.882 ..P WKT 2010 08 30 12 59 55 31.3200 -97.3300 251.000 122.0 94.445 2.820 -999.990 -999.990 0.944 ..P WKT 2010 08 30 13 04 55 31.3200 -97.3300 251.000 457.0 81.488 3.540 -999.990 -999.990 0.815 ..P WKT 2010 08 30 13 09 55 31.3200 -97.3300 251.000 30.0 85.221 3.180 -999.990 -999.990 0.852 ..P WKT 2010 08 30 13 14 55 31.3200 -97.3300 251.000 122.0 91.437 2.730 -999.990 -999.990 0.914 ..P WKT 2010 08 30 13 19 55 31.3200 -97.3300 251.000 457.0 81.101 3.000 -999.990 -999.990 0.811 ..P WKT 2010 08 30 13 29 55 31.3200 -97.3300 251.000 30.0 84.922 3.500 -999.990 -999.990 0.849 ..P WKT 2010 08 30 13 34 55 31.3200 -97.3300 251.000 122.0 95.215 3.500 -999.990 -999.990 0.952 ..P WKT 2010 08 30 13 39 55 31.3200 -97.3300 251.000 457.0 87.304 3.290 -999.990 -999.990 0.873 ..P WKT 2010 08 30 13 44 55 31.3200 -97.3300 251.000 30.0 84.634 3.530 -999.990 -999.990 0.846 ..P WKT 2010 08 30 13 49 55 31.3200 -97.3300 251.000 122.0 93.271 3.960 -999.990 -999.990 0.933 ..P WKT 2010 08 30 13 54 55 31.3200 -97.3300 251.000 457.0 85.637 3.760 -999.990 -999.990 0.856 ..P WKT 2010 08 30 14 04 55 31.3200 -97.3300 251.000 30.0 78.386 3.970 -999.990 -999.990 0.784 ..P WKT 2010 08 30 14 09 55 31.3200 -97.3300 251.000 122.0 84.561 4.550 -999.990 -999.990 0.846 ..P WKT 2010 08 30 14 14 55 31.3200 -97.3300 251.000 457.0 81.360 4.380 -999.990 -999.990 0.814 ..P WKT 2010 08 30 14 19 55 31.3200 -97.3300 251.000 30.0 82.294 4.020 -999.990 -999.990 0.823 ..P WKT 2010 08 30 14 24 55 31.3200 -97.3300 251.000 122.0 89.020 4.530 -999.990 -999.990 0.890 ..P WKT 2010 08 30 14 29 55 31.3200 -97.3300 251.000 457.0 76.167 3.880 -999.990 -999.990 0.762 ..P WKT 2010 08 30 14 39 55 31.3200 -97.3300 251.000 30.0 74.019 3.810 -999.990 -999.990 0.740 ..P WKT 2010 08 30 14 44 55 31.3200 -97.3300 251.000 122.0 88.583 4.180 -999.990 -999.990 0.886 ..P WKT 2010 08 30 14 49 55 31.3200 -97.3300 251.000 457.0 78.606 5.150 -999.990 -999.990 0.786 ..P WKT 2010 08 30 14 54 55 31.3200 -97.3300 251.000 30.0 77.730 4.950 -999.990 -999.990 0.777 ..P WKT 2010 08 30 14 59 55 31.3200 -97.3300 251.000 122.0 83.470 3.580 -999.990 -999.990 0.835 ..P WKT 2010 08 30 15 04 55 31.3200 -97.3300 251.000 457.0 78.733 3.570 -999.990 -999.990 0.787 ..P WKT 2010 08 30 15 14 55 31.3200 -97.3300 251.000 30.0 72.647 3.500 -999.990 -999.990 0.726 ..P WKT 2010 08 30 15 19 55 31.3200 -97.3300 251.000 122.0 83.703 3.900 -999.990 -999.990 0.837 ..P WKT 2010 08 30 15 24 55 31.3200 -97.3300 251.000 457.0 81.250 5.040 -999.990 -999.990 0.812 ..P WKT 2010 08 30 15 29 55 31.3200 -97.3300 251.000 30.0 77.971 4.250 -999.990 -999.990 0.780 ..P WKT 2010 08 30 15 34 55 31.3200 -97.3300 251.000 122.0 85.166 3.850 -999.990 -999.990 0.852 ..P WKT 2010 08 30 15 39 55 31.3200 -97.3300 251.000 457.0 80.095 3.430 -999.990 -999.990 0.801 ..P WKT 2010 08 30 15 49 55 31.3200 -97.3300 251.000 30.0 79.720 4.610 -999.990 -999.990 0.797 ..P WKT 2010 08 30 15 54 55 31.3200 -97.3300 251.000 122.0 88.274 5.160 -999.990 -999.990 0.883 ..P WKT 2010 08 30 15 59 55 31.3200 -97.3300 251.000 457.0 85.251 4.360 -999.990 -999.990 0.853 ..P WKT 2010 08 30 16 04 55 31.3200 -97.3300 251.000 30.0 80.850 4.320 -999.990 -999.990 0.808 ..P WKT 2010 08 30 16 09 55 31.3200 -97.3300 251.000 122.0 87.336 4.120 -999.990 -999.990 0.873 ..P WKT 2010 08 30 16 14 55 31.3200 -97.3300 251.000 457.0 84.727 3.590 -999.990 -999.990 0.847 ..P WKT 2010 08 30 16 24 55 31.3200 -97.3300 251.000 30.0 81.950 4.210 -999.990 -999.990 0.820 ..P WKT 2010 08 30 16 29 55 31.3200 -97.3300 251.000 122.0 92.667 3.900 -999.990 -999.990 0.927 ..P WKT 2010 08 30 16 34 55 31.3200 -97.3300 251.000 457.0 84.507 4.460 -999.990 -999.990 0.845 ..P WKT 2010 08 30 16 39 55 31.3200 -97.3300 251.000 30.0 85.304 4.890 -999.990 -999.990 0.853 ..P WKT 2010 08 30 16 44 55 31.3200 -97.3300 251.000 122.0 93.815 4.900 -999.990 -999.990 0.938 ..P WKT 2010 08 30 16 49 55 31.3200 -97.3300 251.000 457.0 84.692 3.880 -999.990 -999.990 0.847 ..P WKT 2010 08 30 17 04 55 31.3200 -97.3300 251.000 30.0 72.860 3.930 -999.990 -999.990 0.729 ..P WKT 2010 08 30 17 09 55 31.3200 -97.3300 251.000 122.0 83.493 4.620 -999.990 -999.990 0.835 ..P WKT 2010 08 30 17 14 55 31.3200 -97.3300 251.000 457.0 75.113 5.430 -999.990 -999.990 0.751 ..P WKT 2010 08 30 17 19 55 31.3200 -97.3300 251.000 30.0 77.617 5.140 -999.990 -999.990 0.776 ..P WKT 2010 08 30 17 24 55 31.3200 -97.3300 251.000 122.0 79.431 5.060 -999.990 -999.990 0.794 ..P WKT 2010 08 30 17 29 55 31.3200 -97.3300 251.000 457.0 76.425 5.520 -999.990 -999.990 0.764 ..P WKT 2010 08 30 17 39 55 31.3200 -97.3300 251.000 30.0 74.077 4.760 -999.990 -999.990 0.741 ..P WKT 2010 08 30 17 44 55 31.3200 -97.3300 251.000 122.0 81.898 4.650 -999.990 -999.990 0.819 ..P WKT 2010 08 30 17 49 55 31.3200 -97.3300 251.000 457.0 78.149 5.280 -999.990 -999.990 0.781 ..P WKT 2010 08 30 17 54 55 31.3200 -97.3300 251.000 30.0 68.615 5.220 -999.990 -999.990 0.686 ..P WKT 2010 08 30 17 59 55 31.3200 -97.3300 251.000 122.0 80.292 3.460 -999.990 -999.990 0.803 ..P WKT 2010 08 30 18 04 55 31.3200 -97.3300 251.000 457.0 80.675 3.440 -999.990 -999.990 0.807 ..P WKT 2010 08 30 18 14 55 31.3200 -97.3300 251.000 30.0 74.988 3.340 -999.990 -999.990 0.750 ..P WKT 2010 08 30 18 19 55 31.3200 -97.3300 251.000 122.0 88.198 3.370 -999.990 -999.990 0.882 ..P WKT 2010 08 30 18 24 55 31.3200 -97.3300 251.000 457.0 81.577 4.250 -999.990 -999.990 0.816 ..P WKT 2010 08 30 18 29 55 31.3200 -97.3300 251.000 30.0 82.118 3.430 -999.990 -999.990 0.821 ..P WKT 2010 08 30 18 34 55 31.3200 -97.3300 251.000 122.0 83.760 4.320 -999.990 -999.990 0.838 ..P WKT 2010 08 30 18 39 55 31.3200 -97.3300 251.000 457.0 77.139 4.420 -999.990 -999.990 0.771 ..P WKT 2010 08 30 18 49 55 31.3200 -97.3300 251.000 30.0 77.866 4.470 -999.990 -999.990 0.779 ..P WKT 2010 08 30 18 54 55 31.3200 -97.3300 251.000 122.0 84.111 3.520 -999.990 -999.990 0.841 ..P WKT 2010 08 30 18 59 55 31.3200 -97.3300 251.000 457.0 77.687 5.410 -999.990 -999.990 0.777 ..P WKT 2010 08 30 19 04 55 31.3200 -97.3300 251.000 30.0 76.772 3.650 -999.990 -999.990 0.768 ..P WKT 2010 08 30 19 09 55 31.3200 -97.3300 251.000 122.0 86.596 4.240 -999.990 -999.990 0.866 ..P WKT 2010 08 30 19 14 55 31.3200 -97.3300 251.000 457.0 83.477 5.910 -999.990 -999.990 0.835 ..P WKT 2010 08 30 19 24 55 31.3200 -97.3300 251.000 30.0 82.178 3.280 -999.990 -999.990 0.822 ..P WKT 2010 08 30 19 29 55 31.3200 -97.3300 251.000 122.0 90.880 3.450 -999.990 -999.990 0.909 ..P WKT 2010 08 30 19 34 55 31.3200 -97.3300 251.000 457.0 83.337 3.840 -999.990 -999.990 0.833 ..P WKT 2010 08 30 19 39 55 31.3200 -97.3300 251.000 30.0 75.106 4.330 -999.990 -999.990 0.751 ..P WKT 2010 08 30 19 44 55 31.3200 -97.3300 251.000 122.0 94.407 4.120 -999.990 -999.990 0.944 ..P WKT 2010 08 30 19 49 55 31.3200 -97.3300 251.000 457.0 80.669 4.310 -999.990 -999.990 0.807 ..P WKT 2010 08 30 19 59 55 31.3200 -97.3300 251.000 30.0 83.283 4.360 -999.990 -999.990 0.833 ..P WKT 2010 08 30 20 04 55 31.3200 -97.3300 251.000 122.0 90.273 5.750 -999.990 -999.990 0.903 ..P WKT 2010 08 30 20 09 55 31.3200 -97.3300 251.000 457.0 83.774 4.540 -999.990 -999.990 0.838 ..P WKT 2010 08 30 20 14 55 31.3200 -97.3300 251.000 30.0 81.954 4.570 -999.990 -999.990 0.820 ..P WKT 2010 08 30 20 19 55 31.3200 -97.3300 251.000 122.0 85.502 4.660 -999.990 -999.990 0.855 ..P WKT 2010 08 30 20 24 55 31.3200 -97.3300 251.000 457.0 81.343 4.560 -999.990 -999.990 0.813 ..P WKT 2010 08 30 20 34 55 31.3200 -97.3300 251.000 30.0 81.715 4.030 -999.990 -999.990 0.817 ..P WKT 2010 08 30 20 39 55 31.3200 -97.3300 251.000 122.0 88.585 3.830 -999.990 -999.990 0.886 ..P WKT 2010 08 30 20 44 55 31.3200 -97.3300 251.000 457.0 84.997 5.510 -999.990 -999.990 0.850 ..P WKT 2010 08 30 20 49 55 31.3200 -97.3300 251.000 30.0 80.170 3.750 -999.990 -999.990 0.802 ..P WKT 2010 08 30 20 54 55 31.3200 -97.3300 251.000 122.0 90.481 3.660 -999.990 -999.990 0.905 ..P WKT 2010 08 30 20 59 55 31.3200 -97.3300 251.000 457.0 80.974 3.480 -999.990 -999.990 0.810 ..P WKT 2010 08 30 21 09 55 31.3200 -97.3300 251.000 30.0 79.007 3.410 -999.990 -999.990 0.790 ..P WKT 2010 08 30 21 14 55 31.3200 -97.3300 251.000 122.0 89.710 4.640 -999.990 -999.990 0.897 ..P WKT 2010 08 30 21 19 55 31.3200 -97.3300 251.000 457.0 79.773 3.680 -999.990 -999.990 0.798 ..P WKT 2010 08 30 21 24 55 31.3200 -97.3300 251.000 30.0 77.541 3.600 -999.990 -999.990 0.775 ..P WKT 2010 08 30 21 29 55 31.3200 -97.3300 251.000 122.0 85.629 3.530 -999.990 -999.990 0.856 ..P WKT 2010 08 30 21 34 55 31.3200 -97.3300 251.000 457.0 80.508 4.610 -999.990 -999.990 0.805 ..P WKT 2010 08 30 21 44 55 31.3200 -97.3300 251.000 30.0 83.041 3.850 -999.990 -999.990 0.830 ..P WKT 2010 08 30 21 49 55 31.3200 -97.3300 251.000 122.0 89.045 3.250 -999.990 -999.990 0.890 ..P WKT 2010 08 30 21 54 55 31.3200 -97.3300 251.000 457.0 82.116 4.170 -999.990 -999.990 0.821 ..P WKT 2010 08 30 21 59 55 31.3200 -97.3300 251.000 30.0 79.315 3.850 -999.990 -999.990 0.793 ..P WKT 2010 08 30 22 04 55 31.3200 -97.3300 251.000 122.0 86.694 3.260 -999.990 -999.990 0.867 ..P WKT 2010 08 30 22 09 55 31.3200 -97.3300 251.000 457.0 76.740 3.550 -999.990 -999.990 0.767 ..P WKT 2010 08 30 22 19 55 31.3200 -97.3300 251.000 30.0 84.461 3.980 -999.990 -999.990 0.845 ..P WKT 2010 08 30 22 24 55 31.3200 -97.3300 251.000 122.0 90.856 3.690 -999.990 -999.990 0.909 ..P WKT 2010 08 30 22 29 55 31.3200 -97.3300 251.000 457.0 83.771 3.610 -999.990 -999.990 0.838 ..P WKT 2010 08 30 22 34 55 31.3200 -97.3300 251.000 30.0 83.289 3.530 -999.990 -999.990 0.833 ..P WKT 2010 08 30 22 39 55 31.3200 -97.3300 251.000 122.0 92.160 3.560 -999.990 -999.990 0.922 ..P WKT 2010 08 30 22 44 55 31.3200 -97.3300 251.000 457.0 83.150 4.470 -999.990 -999.990 0.832 ..P WKT 2010 08 30 22 54 55 31.3200 -97.3300 251.000 30.0 82.343 3.970 -999.990 -999.990 0.823 ..P WKT 2010 08 30 22 59 55 31.3200 -97.3300 251.000 122.0 96.596 4.680 -999.990 -999.990 0.966 ..P WKT 2010 08 30 23 04 55 31.3200 -97.3300 251.000 457.0 87.194 4.640 -999.990 -999.990 0.872 ..P WKT 2010 08 30 23 09 55 31.3200 -97.3300 251.000 30.0 76.418 3.760 -999.990 -999.990 0.764 ..P WKT 2010 08 30 23 14 55 31.3200 -97.3300 251.000 122.0 87.920 3.840 -999.990 -999.990 0.879 ..P WKT 2010 08 30 23 19 55 31.3200 -97.3300 251.000 457.0 86.219 3.990 -999.990 -999.990 0.862 ..P WKT 2010 08 30 23 29 55 31.3200 -97.3300 251.000 30.0 90.937 4.080 -999.990 -999.990 0.909 ..P WKT 2010 08 30 23 34 55 31.3200 -97.3300 251.000 122.0 94.879 4.220 -999.990 -999.990 0.949 ..P WKT 2010 08 30 23 39 55 31.3200 -97.3300 251.000 457.0 92.772 4.120 -999.990 -999.990 0.928 ..P WKT 2010 08 30 23 44 55 31.3200 -97.3300 251.000 30.0 92.176 4.550 -999.990 -999.990 0.922 ..P WKT 2010 08 30 23 49 55 31.3200 -97.3300 251.000 122.0 101.206 4.470 -999.990 -999.990 1.012 ..P WKT 2010 08 31 00 09 55 31.3200 -97.3300 251.000 457.0 91.361 4.250 -999.990 -999.990 0.914 ..P WKT 2010 08 31 00 10 25 31.3200 -97.3300 251.000 457.0 91.254 3.500 -999.990 -999.990 0.913 ..P WKT 2010 08 31 00 10 55 31.3200 -97.3300 251.000 457.0 92.659 4.510 -999.990 -999.990 0.927 ..P WKT 2010 08 31 00 11 25 31.3200 -97.3300 251.000 457.0 95.439 4.430 -999.990 -999.990 0.954 ..P WKT 2010 08 31 00 11 55 31.3200 -97.3300 251.000 457.0 91.621 3.480 -999.990 -999.990 0.916 ..P WKT 2010 08 31 00 12 25 31.3200 -97.3300 251.000 457.0 88.489 4.110 -999.990 -999.990 0.885 ..P WKT 2010 08 31 00 12 55 31.3200 -97.3300 251.000 457.0 89.482 4.760 -999.990 -999.990 0.895 ..P WKT 2010 08 31 00 13 25 31.3200 -97.3300 251.000 457.0 92.674 3.820 -999.990 -999.990 0.927 ..P WKT 2010 08 31 00 13 55 31.3200 -97.3300 251.000 457.0 89.544 3.510 -999.990 -999.990 0.895 ..P WKT 2010 08 31 00 14 25 31.3200 -97.3300 251.000 457.0 92.461 3.860 -999.990 -999.990 0.925 ..P WKT 2010 08 31 00 14 55 31.3200 -97.3300 251.000 457.0 92.353 3.480 -999.990 -999.990 0.924 ..P WKT 2010 08 31 00 19 55 31.3200 -97.3300 251.000 30.0 86.061 4.080 -999.990 -999.990 0.861 ..P WKT 2010 08 31 00 24 55 31.3200 -97.3300 251.000 122.0 92.552 4.150 -999.990 -999.990 0.926 ..P WKT 2010 08 31 00 29 55 31.3200 -97.3300 251.000 457.0 94.644 4.190 -999.990 -999.990 0.946 ..P WKT 2010 08 31 00 34 55 31.3200 -97.3300 251.000 30.0 86.704 4.520 -999.990 -999.990 0.867 ..P WKT 2010 08 31 00 39 55 31.3200 -97.3300 251.000 122.0 96.216 3.920 -999.990 -999.990 0.962 ..P WKT 2010 08 31 00 44 55 31.3200 -97.3300 251.000 457.0 91.163 4.290 -999.990 -999.990 0.912 ..P WKT 2010 08 31 00 54 55 31.3200 -97.3300 251.000 30.0 88.720 4.240 -999.990 -999.990 0.887 ..P WKT 2010 08 31 00 59 55 31.3200 -97.3300 251.000 122.0 96.001 4.310 -999.990 -999.990 0.960 ..P WKT 2010 08 31 01 04 55 31.3200 -97.3300 251.000 457.0 89.681 4.320 -999.990 -999.990 0.897 ..P WKT 2010 08 31 01 09 55 31.3200 -97.3300 251.000 30.0 90.368 4.310 -999.990 -999.990 0.904 ..P WKT 2010 08 31 01 14 55 31.3200 -97.3300 251.000 122.0 90.918 4.290 -999.990 -999.990 0.909 ..P WKT 2010 08 31 01 19 55 31.3200 -97.3300 251.000 457.0 88.171 6.110 -999.990 -999.990 0.882 ..P WKT 2010 08 31 01 29 55 31.3200 -97.3300 251.000 30.0 80.637 4.490 -999.990 -999.990 0.806 ..P WKT 2010 08 31 01 34 55 31.3200 -97.3300 251.000 122.0 92.879 4.090 -999.990 -999.990 0.929 ..P WKT 2010 08 31 01 39 55 31.3200 -97.3300 251.000 457.0 84.385 3.860 -999.990 -999.990 0.844 ..P WKT 2010 08 31 01 44 55 31.3200 -97.3300 251.000 30.0 82.208 4.550 -999.990 -999.990 0.822 ..P WKT 2010 08 31 01 49 55 31.3200 -97.3300 251.000 122.0 87.171 3.860 -999.990 -999.990 0.872 ..P WKT 2010 08 31 01 54 55 31.3200 -97.3300 251.000 457.0 74.011 5.260 -999.990 -999.990 0.740 ..P WKT 2010 08 31 02 04 55 31.3200 -97.3300 251.000 30.0 80.739 3.940 -999.990 -999.990 0.807 ..P WKT 2010 08 31 02 09 55 31.3200 -97.3300 251.000 122.0 87.171 3.850 -999.990 -999.990 0.872 ..P WKT 2010 08 31 02 14 55 31.3200 -97.3300 251.000 457.0 85.916 4.280 -999.990 -999.990 0.859 ..P WKT 2010 08 31 02 19 55 31.3200 -97.3300 251.000 30.0 81.643 4.230 -999.990 -999.990 0.816 ..P WKT 2010 08 31 02 24 55 31.3200 -97.3300 251.000 122.0 90.544 3.780 -999.990 -999.990 0.905 ..P WKT 2010 08 31 02 29 55 31.3200 -97.3300 251.000 457.0 84.898 4.070 -999.990 -999.990 0.849 ..P WKT 2010 08 31 02 39 55 31.3200 -97.3300 251.000 30.0 81.762 3.700 -999.990 -999.990 0.818 ..P WKT 2010 08 31 02 44 55 31.3200 -97.3300 251.000 122.0 89.760 4.000 -999.990 -999.990 0.898 ..P WKT 2010 08 31 02 49 55 31.3200 -97.3300 251.000 457.0 87.604 4.120 -999.990 -999.990 0.876 ..P WKT 2010 08 31 02 54 55 31.3200 -97.3300 251.000 30.0 83.254 4.020 -999.990 -999.990 0.833 ..P WKT 2010 08 31 02 59 55 31.3200 -97.3300 251.000 122.0 85.488 3.520 -999.990 -999.990 0.855 ..P WKT 2010 08 31 03 04 55 31.3200 -97.3300 251.000 457.0 86.351 3.760 -999.990 -999.990 0.864 ..P WKT 2010 08 31 03 14 55 31.3200 -97.3300 251.000 30.0 83.000 3.940 -999.990 -999.990 0.830 ..P WKT 2010 08 31 03 19 55 31.3200 -97.3300 251.000 122.0 86.195 3.430 -999.990 -999.990 0.862 ..P WKT 2010 08 31 03 24 55 31.3200 -97.3300 251.000 457.0 86.097 3.610 -999.990 -999.990 0.861 ..P WKT 2010 08 31 03 29 55 31.3200 -97.3300 251.000 30.0 80.788 5.050 -999.990 -999.990 0.808 ..P WKT 2010 08 31 03 34 55 31.3200 -97.3300 251.000 122.0 93.717 3.760 -999.990 -999.990 0.937 ..P WKT 2010 08 31 03 39 55 31.3200 -97.3300 251.000 457.0 81.279 4.120 -999.990 -999.990 0.813 ..P WKT 2010 08 31 03 49 55 31.3200 -97.3300 251.000 30.0 95.871 4.310 -999.990 -999.990 0.959 ..P WKT 2010 08 31 03 54 55 31.3200 -97.3300 251.000 122.0 93.148 3.770 -999.990 -999.990 0.931 ..P WKT 2010 08 31 03 59 55 31.3200 -97.3300 251.000 457.0 83.162 3.820 -999.990 -999.990 0.832 ..P WKT 2010 08 31 04 04 55 31.3200 -97.3300 251.000 30.0 83.729 3.840 -999.990 -999.990 0.837 ..P WKT 2010 08 31 04 09 55 31.3200 -97.3300 251.000 122.0 84.709 3.800 -999.990 -999.990 0.847 ..P WKT 2010 08 31 04 14 55 31.3200 -97.3300 251.000 457.0 74.588 4.400 -999.990 -999.990 0.746 ..P WKT 2010 08 31 04 24 55 31.3200 -97.3300 251.000 30.0 80.815 4.590 -999.990 -999.990 0.808 ..P WKT 2010 08 31 04 29 55 31.3200 -97.3300 251.000 122.0 79.347 4.320 -999.990 -999.990 0.793 ..P WKT 2010 08 31 04 34 55 31.3200 -97.3300 251.000 457.0 76.784 4.210 -999.990 -999.990 0.768 ..P WKT 2010 08 31 04 39 55 31.3200 -97.3300 251.000 30.0 82.714 4.330 -999.990 -999.990 0.827 ..P WKT 2010 08 31 04 44 55 31.3200 -97.3300 251.000 122.0 81.932 4.480 -999.990 -999.990 0.819 ..P WKT 2010 08 31 04 49 55 31.3200 -97.3300 251.000 457.0 76.766 4.560 -999.990 -999.990 0.768 ..P WKT 2010 08 31 05 04 55 31.3200 -97.3300 251.000 30.0 80.814 4.430 -999.990 -999.990 0.808 ..P WKT 2010 08 31 05 09 55 31.3200 -97.3300 251.000 122.0 81.311 4.330 -999.990 -999.990 0.813 ..P WKT 2010 08 31 05 14 55 31.3200 -97.3300 251.000 457.0 74.276 4.480 -999.990 -999.990 0.743 ..P WKT 2010 08 31 05 19 55 31.3200 -97.3300 251.000 30.0 79.018 4.410 -999.990 -999.990 0.790 ..P WKT 2010 08 31 05 24 55 31.3200 -97.3300 251.000 122.0 86.362 4.180 -999.990 -999.990 0.864 ..P WKT 2010 08 31 05 29 55 31.3200 -97.3300 251.000 457.0 79.191 4.500 -999.990 -999.990 0.792 ..P WKT 2010 08 31 05 39 55 31.3200 -97.3300 251.000 30.0 80.687 3.710 -999.990 -999.990 0.807 ..P WKT 2010 08 31 05 44 55 31.3200 -97.3300 251.000 122.0 84.559 3.580 -999.990 -999.990 0.846 ..P WKT 2010 08 31 05 49 55 31.3200 -97.3300 251.000 457.0 73.647 3.460 -999.990 -999.990 0.736 ..P WKT 2010 08 31 05 54 55 31.3200 -97.3300 251.000 30.0 74.782 4.660 -999.990 -999.990 0.748 ..P WKT 2010 08 31 05 59 55 31.3200 -97.3300 251.000 122.0 77.286 4.900 -999.990 -999.990 0.773 ..P WKT 2010 08 31 06 04 55 31.3200 -97.3300 251.000 457.0 70.209 3.550 -999.990 -999.990 0.702 ..P WKT 2010 08 31 06 14 55 31.3200 -97.3300 251.000 30.0 75.060 3.060 -999.990 -999.990 0.751 ..P WKT 2010 08 31 06 19 55 31.3200 -97.3300 251.000 122.0 83.701 3.350 -999.990 -999.990 0.837 ..P WKT 2010 08 31 06 24 55 31.3200 -97.3300 251.000 457.0 64.428 4.810 -999.990 -999.990 0.644 ..P WKT 2010 08 31 06 29 55 31.3200 -97.3300 251.000 30.0 82.920 3.800 -999.990 -999.990 0.829 ..P WKT 2010 08 31 06 34 55 31.3200 -97.3300 251.000 122.0 82.803 3.540 -999.990 -999.990 0.828 ..P WKT 2010 08 31 06 39 55 31.3200 -97.3300 251.000 457.0 74.752 3.490 -999.990 -999.990 0.748 ..P WKT 2010 08 31 06 49 55 31.3200 -97.3300 251.000 30.0 82.531 3.230 -999.990 -999.990 0.825 ..P WKT 2010 08 31 06 54 55 31.3200 -97.3300 251.000 122.0 86.869 3.950 -999.990 -999.990 0.869 ..P WKT 2010 08 31 06 59 55 31.3200 -97.3300 251.000 457.0 70.145 3.750 -999.990 -999.990 0.701 ..P WKT 2010 08 31 07 04 55 31.3200 -97.3300 251.000 30.0 72.022 4.230 -999.990 -999.990 0.720 ..P WKT 2010 08 31 07 09 55 31.3200 -97.3300 251.000 122.0 79.915 3.700 -999.990 -999.990 0.799 ..P WKT 2010 08 31 07 14 55 31.3200 -97.3300 251.000 457.0 70.032 3.250 -999.990 -999.990 0.700 ..P WKT 2010 08 31 07 24 55 31.3200 -97.3300 251.000 30.0 77.925 5.160 -999.990 -999.990 0.779 ..P WKT 2010 08 31 07 29 55 31.3200 -97.3300 251.000 122.0 78.883 3.770 -999.990 -999.990 0.789 ..P WKT 2010 08 31 07 34 55 31.3200 -97.3300 251.000 457.0 67.947 4.040 -999.990 -999.990 0.679 ..P WKT 2010 08 31 07 39 55 31.3200 -97.3300 251.000 30.0 75.740 3.680 -999.990 -999.990 0.757 ..P WKT 2010 08 31 07 44 55 31.3200 -97.3300 251.000 122.0 88.999 4.480 -999.990 -999.990 0.890 ..P WKT 2010 08 31 07 49 55 31.3200 -97.3300 251.000 457.0 64.123 3.600 -999.990 -999.990 0.641 ..P WKT 2010 08 31 07 59 55 31.3200 -97.3300 251.000 30.0 77.696 3.720 -999.990 -999.990 0.777 ..P WKT 2010 08 31 08 04 55 31.3200 -97.3300 251.000 122.0 83.066 3.480 -999.990 -999.990 0.831 ..P WKT 2010 08 31 08 09 55 31.3200 -97.3300 251.000 457.0 67.390 5.490 -999.990 -999.990 0.674 ..P WKT 2010 08 31 08 14 55 31.3200 -97.3300 251.000 30.0 77.952 3.680 -999.990 -999.990 0.780 ..P WKT 2010 08 31 08 19 55 31.3200 -97.3300 251.000 122.0 84.550 3.970 -999.990 -999.990 0.846 ..P WKT 2010 08 31 08 24 55 31.3200 -97.3300 251.000 457.0 66.829 3.220 -999.990 -999.990 0.668 ..P WKT 2010 08 31 08 34 55 31.3200 -97.3300 251.000 30.0 79.321 2.860 -999.990 -999.990 0.793 ..P WKT 2010 08 31 08 39 55 31.3200 -97.3300 251.000 122.0 77.703 3.040 -999.990 -999.990 0.777 ..P WKT 2010 08 31 08 44 55 31.3200 -97.3300 251.000 457.0 67.068 2.930 -999.990 -999.990 0.671 ..P WKT 2010 08 31 08 49 55 31.3200 -97.3300 251.000 30.0 75.421 3.090 -999.990 -999.990 0.754 ..P WKT 2010 08 31 08 54 55 31.3200 -97.3300 251.000 122.0 80.495 3.790 -999.990 -999.990 0.805 ..P WKT 2010 08 31 08 59 55 31.3200 -97.3300 251.000 457.0 68.907 3.140 -999.990 -999.990 0.689 ..P WKT 2010 08 31 09 09 55 31.3200 -97.3300 251.000 30.0 72.245 3.160 -999.990 -999.990 0.722 ..P WKT 2010 08 31 09 14 55 31.3200 -97.3300 251.000 122.0 80.477 3.640 -999.990 -999.990 0.805 ..P WKT 2010 08 31 09 19 55 31.3200 -97.3300 251.000 457.0 68.502 3.240 -999.990 -999.990 0.685 ..P WKT 2010 08 31 09 24 55 31.3200 -97.3300 251.000 30.0 69.908 3.540 -999.990 -999.990 0.699 ..P WKT 2010 08 31 09 29 55 31.3200 -97.3300 251.000 122.0 75.954 3.120 -999.990 -999.990 0.760 ..P WKT 2010 08 31 09 34 55 31.3200 -97.3300 251.000 457.0 61.798 3.060 -999.990 -999.990 0.618 ..P WKT 2010 08 31 09 44 55 31.3200 -97.3300 251.000 30.0 67.573 3.470 -999.990 -999.990 0.676 ..P WKT 2010 08 31 09 49 55 31.3200 -97.3300 251.000 122.0 75.491 3.310 -999.990 -999.990 0.755 ..P WKT 2010 08 31 09 54 55 31.3200 -97.3300 251.000 457.0 70.032 3.290 -999.990 -999.990 0.700 ..P WKT 2010 08 31 09 59 55 31.3200 -97.3300 251.000 30.0 70.034 3.930 -999.990 -999.990 0.700 ..P WKT 2010 08 31 10 04 55 31.3200 -97.3300 251.000 122.0 71.945 3.840 -999.990 -999.990 0.719 ..P WKT 2010 08 31 10 09 55 31.3200 -97.3300 251.000 457.0 64.305 5.630 -999.990 -999.990 0.643 ..P WKT 2010 08 31 10 19 55 31.3200 -97.3300 251.000 30.0 70.506 3.620 -999.990 -999.990 0.705 ..P WKT 2010 08 31 10 24 55 31.3200 -97.3300 251.000 122.0 75.068 3.870 -999.990 -999.990 0.751 ..P WKT 2010 08 31 10 29 55 31.3200 -97.3300 251.000 457.0 58.622 3.750 -999.990 -999.990 0.586 ..P WKT 2010 08 31 10 34 55 31.3200 -97.3300 251.000 30.0 64.275 4.440 -999.990 -999.990 0.643 ..P WKT 2010 08 31 10 39 55 31.3200 -97.3300 251.000 122.0 70.745 3.780 -999.990 -999.990 0.707 ..P WKT 2010 08 31 10 44 55 31.3200 -97.3300 251.000 457.0 56.757 3.860 -999.990 -999.990 0.568 ..P WKT 2010 08 31 10 54 55 31.3200 -97.3300 251.000 30.0 60.482 5.090 -999.990 -999.990 0.605 ..P WKT 2010 08 31 10 59 55 31.3200 -97.3300 251.000 122.0 66.191 3.680 -999.990 -999.990 0.662 ..P WKT 2010 08 31 11 04 55 31.3200 -97.3300 251.000 457.0 62.083 3.540 -999.990 -999.990 0.621 ..P WKT 2010 08 31 11 09 55 31.3200 -97.3300 251.000 30.0 66.701 3.570 -999.990 -999.990 0.667 ..P WKT 2010 08 31 11 14 55 31.3200 -97.3300 251.000 122.0 69.409 3.720 -999.990 -999.990 0.694 ..P WKT 2010 08 31 11 19 55 31.3200 -97.3300 251.000 457.0 62.575 3.350 -999.990 -999.990 0.626 ..P WKT 2010 08 31 11 29 55 31.3200 -97.3300 251.000 30.0 65.933 4.530 -999.990 -999.990 0.659 ..P WKT 2010 08 31 11 34 55 31.3200 -97.3300 251.000 122.0 77.077 4.350 -999.990 -999.990 0.771 ..P WKT 2010 08 31 11 39 55 31.3200 -97.3300 251.000 457.0 70.365 3.260 -999.990 -999.990 0.704 ..P WKT 2010 08 31 11 44 55 31.3200 -97.3300 251.000 30.0 70.878 3.660 -999.990 -999.990 0.709 ..P WKT 2010 08 31 11 49 55 31.3200 -97.3300 251.000 122.0 80.930 4.430 -999.990 -999.990 0.809 ..P WKT 2010 08 31 12 09 55 31.3200 -97.3300 251.000 457.0 57.336 4.450 -999.990 -999.990 0.573 ..P WKT 2010 08 31 12 10 25 31.3200 -97.3300 251.000 457.0 61.300 3.910 -999.990 -999.990 0.613 ..P WKT 2010 08 31 12 10 55 31.3200 -97.3300 251.000 457.0 58.992 3.720 -999.990 -999.990 0.590 ..P WKT 2010 08 31 12 11 25 31.3200 -97.3300 251.000 457.0 60.229 4.160 -999.990 -999.990 0.602 ..P WKT 2010 08 31 12 11 55 31.3200 -97.3300 251.000 457.0 64.737 3.770 -999.990 -999.990 0.647 ..P WKT 2010 08 31 12 12 25 31.3200 -97.3300 251.000 457.0 67.883 3.730 -999.990 -999.990 0.679 ..P WKT 2010 08 31 12 12 55 31.3200 -97.3300 251.000 457.0 65.031 4.580 -999.990 -999.990 0.650 ..P WKT 2010 08 31 12 13 25 31.3200 -97.3300 251.000 457.0 59.451 4.150 -999.990 -999.990 0.595 ..P WKT 2010 08 31 12 13 55 31.3200 -97.3300 251.000 457.0 62.051 4.220 -999.990 -999.990 0.621 ..P WKT 2010 08 31 12 14 25 31.3200 -97.3300 251.000 457.0 59.744 3.860 -999.990 -999.990 0.597 ..P WKT 2010 08 31 12 14 55 31.3200 -97.3300 251.000 457.0 65.343 4.070 -999.990 -999.990 0.653 ..P WKT 2010 08 31 12 19 55 31.3200 -97.3300 251.000 30.0 70.626 4.770 -999.990 -999.990 0.706 ..P WKT 2010 08 31 12 24 55 31.3200 -97.3300 251.000 122.0 74.683 3.900 -999.990 -999.990 0.747 ..P WKT 2010 08 31 12 29 55 31.3200 -97.3300 251.000 457.0 65.919 3.930 -999.990 -999.990 0.659 ..P WKT 2010 08 31 12 34 55 31.3200 -97.3300 251.000 30.0 74.752 4.380 -999.990 -999.990 0.748 ..P WKT 2010 08 31 12 39 55 31.3200 -97.3300 251.000 122.0 74.172 4.140 -999.990 -999.990 0.742 ..P WKT 2010 08 31 12 44 55 31.3200 -97.3300 251.000 457.0 63.083 4.290 -999.990 -999.990 0.631 ..P WKT 2010 08 31 12 54 55 31.3200 -97.3300 251.000 30.0 74.686 4.110 -999.990 -999.990 0.747 ..P WKT 2010 08 31 12 59 55 31.3200 -97.3300 251.000 122.0 75.814 4.890 -999.990 -999.990 0.758 ..P WKT 2010 08 31 13 04 55 31.3200 -97.3300 251.000 457.0 61.509 3.660 -999.990 -999.990 0.615 ..P WKT 2010 08 31 13 09 55 31.3200 -97.3300 251.000 30.0 73.154 3.380 -999.990 -999.990 0.732 ..P WKT 2010 08 31 13 14 55 31.3200 -97.3300 251.000 122.0 81.251 3.340 -999.990 -999.990 0.813 ..P WKT 2010 08 31 13 19 55 31.3200 -97.3300 251.000 457.0 74.044 3.400 -999.990 -999.990 0.740 ..P WKT 2010 08 31 13 29 55 31.3200 -97.3300 251.000 30.0 73.647 3.480 -999.990 -999.990 0.736 ..P WKT 2010 08 31 13 34 55 31.3200 -97.3300 251.000 122.0 80.870 4.010 -999.990 -999.990 0.809 ..P WKT 2010 08 31 13 39 55 31.3200 -97.3300 251.000 457.0 71.139 3.080 -999.990 -999.990 0.711 ..P WKT 2010 08 31 13 44 55 31.3200 -97.3300 251.000 30.0 73.441 3.330 -999.990 -999.990 0.734 ..P WKT 2010 08 31 13 49 55 31.3200 -97.3300 251.000 122.0 76.017 4.360 -999.990 -999.990 0.760 ..P WKT 2010 08 31 13 54 55 31.3200 -97.3300 251.000 457.0 74.763 4.020 -999.990 -999.990 0.748 ..P WKT 2010 08 31 14 04 55 31.3200 -97.3300 251.000 30.0 79.253 3.130 -999.990 -999.990 0.793 ..P WKT 2010 08 31 14 09 55 31.3200 -97.3300 251.000 122.0 86.643 3.290 -999.990 -999.990 0.866 ..P WKT 2010 08 31 14 14 55 31.3200 -97.3300 251.000 457.0 63.639 3.580 -999.990 -999.990 0.636 ..P WKT 2010 08 31 14 19 55 31.3200 -97.3300 251.000 30.0 73.493 3.750 -999.990 -999.990 0.735 ..P WKT 2010 08 31 14 24 55 31.3200 -97.3300 251.000 122.0 74.860 3.800 -999.990 -999.990 0.749 ..P WKT 2010 08 31 14 29 55 31.3200 -97.3300 251.000 457.0 72.117 4.440 -999.990 -999.990 0.721 ..P WKT 2010 08 31 14 39 55 31.3200 -97.3300 251.000 30.0 75.438 4.260 -999.990 -999.990 0.754 ..P WKT 2010 08 31 14 44 55 31.3200 -97.3300 251.000 122.0 88.358 4.030 -999.990 -999.990 0.884 ..P WKT 2010 08 31 14 49 55 31.3200 -97.3300 251.000 457.0 76.880 4.600 -999.990 -999.990 0.769 ..P WKT 2010 08 31 14 54 55 31.3200 -97.3300 251.000 30.0 73.900 4.680 -999.990 -999.990 0.739 ..P WKT 2010 08 31 14 59 55 31.3200 -97.3300 251.000 122.0 80.519 4.190 -999.990 -999.990 0.805 ..P WKT 2010 08 31 15 04 55 31.3200 -97.3300 251.000 457.0 76.714 3.800 -999.990 -999.990 0.767 ..P WKT 2010 08 31 15 14 55 31.3200 -97.3300 251.000 30.0 73.748 4.150 -999.990 -999.990 0.737 ..P WKT 2010 08 31 15 19 55 31.3200 -97.3300 251.000 122.0 81.725 4.750 -999.990 -999.990 0.817 ..P WKT 2010 08 31 15 24 55 31.3200 -97.3300 251.000 457.0 70.211 4.770 -999.990 -999.990 0.702 ..P WKT 2010 08 31 15 29 55 31.3200 -97.3300 251.000 30.0 72.973 4.650 -999.990 -999.990 0.730 ..P WKT 2010 08 31 15 34 55 31.3200 -97.3300 251.000 122.0 83.013 7.240 -999.990 -999.990 0.830 ..P WKT 2010 08 31 15 39 55 31.3200 -97.3300 251.000 457.0 70.807 5.240 -999.990 -999.990 0.708 ..P WKT 2010 08 31 15 49 55 31.3200 -97.3300 251.000 30.0 74.705 5.280 -999.990 -999.990 0.747 ..P WKT 2010 08 31 15 54 55 31.3200 -97.3300 251.000 122.0 81.749 4.840 -999.990 -999.990 0.817 ..P WKT 2010 08 31 15 59 55 31.3200 -97.3300 251.000 457.0 79.587 4.750 -999.990 -999.990 0.796 ..P WKT 2010 08 31 16 04 55 31.3200 -97.3300 251.000 30.0 76.187 4.640 -999.990 -999.990 0.762 ..P WKT 2010 08 31 16 09 55 31.3200 -97.3300 251.000 122.0 76.223 4.790 -999.990 -999.990 0.762 ..P WKT 2010 08 31 16 14 55 31.3200 -97.3300 251.000 457.0 75.985 4.080 -999.990 -999.990 0.760 ..P WKT 2010 08 31 16 24 55 31.3200 -97.3300 251.000 30.0 74.288 3.960 -999.990 -999.990 0.743 ..P WKT 2010 08 31 16 29 55 31.3200 -97.3300 251.000 122.0 80.536 4.100 -999.990 -999.990 0.805 ..P WKT 2010 08 31 16 34 55 31.3200 -97.3300 251.000 457.0 79.217 5.310 -999.990 -999.990 0.792 ..P WKT 2010 08 31 16 39 55 31.3200 -97.3300 251.000 30.0 68.261 5.580 -999.990 -999.990 0.683 ..P WKT 2010 08 31 16 44 55 31.3200 -97.3300 251.000 122.0 82.634 5.330 -999.990 -999.990 0.826 ..P WKT 2010 08 31 16 49 55 31.3200 -97.3300 251.000 457.0 72.914 4.390 -999.990 -999.990 0.729 ..P WKT 2010 08 31 17 04 55 31.3200 -97.3300 251.000 30.0 66.522 4.980 -999.990 -999.990 0.665 ..P WKT 2010 08 31 17 09 55 31.3200 -97.3300 251.000 122.0 82.104 5.500 -999.990 -999.990 0.821 ..P WKT 2010 08 31 17 14 55 31.3200 -97.3300 251.000 457.0 76.883 6.240 -999.990 -999.990 0.769 ..P WKT 2010 08 31 17 19 55 31.3200 -97.3300 251.000 30.0 76.070 7.170 -999.990 -999.990 0.761 ..P WKT 2010 08 31 17 24 55 31.3200 -97.3300 251.000 122.0 84.632 5.650 -999.990 -999.990 0.846 ..P WKT 2010 08 31 17 29 55 31.3200 -97.3300 251.000 457.0 79.408 5.070 -999.990 -999.990 0.794 ..P WKT 2010 08 31 17 39 55 31.3200 -97.3300 251.000 30.0 80.484 4.630 -999.990 -999.990 0.805 ..P WKT 2010 08 31 17 44 55 31.3200 -97.3300 251.000 122.0 94.515 4.440 -999.990 -999.990 0.945 ..P WKT 2010 08 31 17 49 55 31.3200 -97.3300 251.000 457.0 78.193 4.580 -999.990 -999.990 0.782 ..P WKT 2010 08 31 17 54 55 31.3200 -97.3300 251.000 30.0 80.635 4.740 -999.990 -999.990 0.806 ..P WKT 2010 08 31 17 59 55 31.3200 -97.3300 251.000 122.0 83.631 5.540 -999.990 -999.990 0.836 ..P WKT 2010 08 31 18 04 55 31.3200 -97.3300 251.000 457.0 79.171 5.000 -999.990 -999.990 0.792 ..P WKT 2010 08 31 18 14 55 31.3200 -97.3300 251.000 30.0 74.352 5.160 -999.990 -999.990 0.744 ..P WKT 2010 08 31 18 19 55 31.3200 -97.3300 251.000 122.0 78.138 4.910 -999.990 -999.990 0.781 ..P WKT 2010 08 31 18 24 55 31.3200 -97.3300 251.000 457.0 78.609 4.890 -999.990 -999.990 0.786 ..P WKT 2010 08 31 18 29 55 31.3200 -97.3300 251.000 30.0 78.251 4.690 -999.990 -999.990 0.783 ..P WKT 2010 08 31 18 34 55 31.3200 -97.3300 251.000 122.0 83.422 5.040 -999.990 -999.990 0.834 ..P WKT 2010 08 31 18 39 55 31.3200 -97.3300 251.000 457.0 80.299 4.560 -999.990 -999.990 0.803 ..P WKT 2010 08 31 18 49 55 31.3200 -97.3300 251.000 30.0 76.897 4.790 -999.990 -999.990 0.769 ..P WKT 2010 08 31 18 54 55 31.3200 -97.3300 251.000 122.0 77.724 5.250 -999.990 -999.990 0.777 ..P WKT 2010 08 31 18 59 55 31.3200 -97.3300 251.000 457.0 67.761 5.110 -999.990 -999.990 0.678 ..P WKT 2010 08 31 19 04 55 31.3200 -97.3300 251.000 30.0 68.586 5.500 -999.990 -999.990 0.686 ..P WKT 2010 08 31 19 09 55 31.3200 -97.3300 251.000 122.0 77.162 5.770 -999.990 -999.990 0.772 ..P WKT 2010 08 31 19 14 55 31.3200 -97.3300 251.000 457.0 68.300 6.270 -999.990 -999.990 0.683 ..P WKT 2010 08 31 19 24 55 31.3200 -97.3300 251.000 30.0 67.639 6.390 -999.990 -999.990 0.676 ..P WKT 2010 08 31 19 29 55 31.3200 -97.3300 251.000 122.0 81.384 5.860 -999.990 -999.990 0.814 ..P WKT 2010 08 31 19 34 55 31.3200 -97.3300 251.000 457.0 74.774 5.540 -999.990 -999.990 0.748 ..P WKT 2010 08 31 19 39 55 31.3200 -97.3300 251.000 30.0 73.009 5.040 -999.990 -999.990 0.730 ..P WKT 2010 08 31 19 44 55 31.3200 -97.3300 251.000 122.0 82.605 4.810 -999.990 -999.990 0.826 ..P WKT 2010 08 31 19 49 55 31.3200 -97.3300 251.000 457.0 71.972 4.590 -999.990 -999.990 0.720 ..P WKT 2010 08 31 19 59 55 31.3200 -97.3300 251.000 30.0 78.837 4.350 -999.990 -999.990 0.788 ..P WKT 2010 08 31 20 04 55 31.3200 -97.3300 251.000 122.0 86.362 4.400 -999.990 -999.990 0.864 ..P WKT 2010 08 31 20 09 55 31.3200 -97.3300 251.000 457.0 80.020 5.990 -999.990 -999.990 0.800 ..P WKT 2010 08 31 20 14 55 31.3200 -97.3300 251.000 30.0 74.648 4.590 -999.990 -999.990 0.746 ..P WKT 2010 08 31 20 19 55 31.3200 -97.3300 251.000 122.0 81.483 4.980 -999.990 -999.990 0.815 ..P WKT 2010 08 31 20 24 55 31.3200 -97.3300 251.000 457.0 73.888 5.380 -999.990 -999.990 0.739 ..P WKT 2010 08 31 20 34 55 31.3200 -97.3300 251.000 30.0 70.946 5.420 -999.990 -999.990 0.709 ..P WKT 2010 08 31 20 39 55 31.3200 -97.3300 251.000 122.0 79.075 4.900 -999.990 -999.990 0.791 ..P WKT 2010 08 31 20 44 55 31.3200 -97.3300 251.000 457.0 76.235 4.910 -999.990 -999.990 0.762 ..P WKT 2010 08 31 20 49 55 31.3200 -97.3300 251.000 30.0 71.034 5.120 -999.990 -999.990 0.710 ..P WKT 2010 08 31 20 54 55 31.3200 -97.3300 251.000 122.0 84.167 4.650 -999.990 -999.990 0.842 ..P WKT 2010 08 31 20 59 55 31.3200 -97.3300 251.000 457.0 72.852 4.940 -999.990 -999.990 0.729 ..P WKT 2010 08 31 21 09 55 31.3200 -97.3300 251.000 30.0 81.621 4.410 -999.990 -999.990 0.816 ..P WKT 2010 08 31 21 14 55 31.3200 -97.3300 251.000 122.0 83.506 4.830 -999.990 -999.990 0.835 ..P WKT 2010 08 31 21 19 55 31.3200 -97.3300 251.000 457.0 76.771 5.090 -999.990 -999.990 0.768 ..P WKT 2010 08 31 21 24 55 31.3200 -97.3300 251.000 30.0 75.040 4.950 -999.990 -999.990 0.750 ..P WKT 2010 08 31 21 29 55 31.3200 -97.3300 251.000 122.0 87.773 5.360 -999.990 -999.990 0.878 ..P WKT 2010 08 31 21 34 55 31.3200 -97.3300 251.000 457.0 78.809 5.320 -999.990 -999.990 0.788 ..P WKT 2010 08 31 21 44 55 31.3200 -97.3300 251.000 30.0 76.280 5.790 -999.990 -999.990 0.763 ..P WKT 2010 08 31 21 49 55 31.3200 -97.3300 251.000 122.0 85.781 6.520 -999.990 -999.990 0.858 ..P WKT 2010 08 31 21 54 55 31.3200 -97.3300 251.000 457.0 78.023 6.050 -999.990 -999.990 0.780 ..P WKT 2010 08 31 21 59 55 31.3200 -97.3300 251.000 30.0 70.542 5.380 -999.990 -999.990 0.705 ..P WKT 2010 08 31 22 04 55 31.3200 -97.3300 251.000 122.0 88.960 5.070 -999.990 -999.990 0.890 ..P WKT 2010 08 31 22 09 55 31.3200 -97.3300 251.000 457.0 72.564 5.160 -999.990 -999.990 0.726 ..P WKT 2010 08 31 22 19 55 31.3200 -97.3300 251.000 30.0 79.165 5.690 -999.990 -999.990 0.792 ..P WKT 2010 08 31 22 24 55 31.3200 -97.3300 251.000 122.0 82.666 4.880 -999.990 -999.990 0.827 ..P WKT 2010 08 31 22 29 55 31.3200 -97.3300 251.000 457.0 75.018 5.280 -999.990 -999.990 0.750 ..P WKT 2010 08 31 22 34 55 31.3200 -97.3300 251.000 30.0 77.405 4.970 -999.990 -999.990 0.774 ..P WKT 2010 08 31 22 39 55 31.3200 -97.3300 251.000 122.0 87.880 4.930 -999.990 -999.990 0.879 ..P WKT 2010 08 31 22 44 55 31.3200 -97.3300 251.000 457.0 84.134 5.120 -999.990 -999.990 0.841 ..P WKT 2010 08 31 22 54 55 31.3200 -97.3300 251.000 30.0 71.754 5.000 -999.990 -999.990 0.718 ..P WKT 2010 08 31 22 59 55 31.3200 -97.3300 251.000 122.0 89.631 5.140 -999.990 -999.990 0.896 ..P WKT 2010 08 31 23 04 55 31.3200 -97.3300 251.000 457.0 89.651 5.180 -999.990 -999.990 0.897 ..P WKT 2010 08 31 23 09 55 31.3200 -97.3300 251.000 30.0 82.412 5.050 -999.990 -999.990 0.824 ..P WKT 2010 08 31 23 14 55 31.3200 -97.3300 251.000 122.0 87.596 5.510 -999.990 -999.990 0.876 ..P WKT 2010 08 31 23 19 55 31.3200 -97.3300 251.000 457.0 77.422 5.350 -999.990 -999.990 0.774 ..P WKT 2010 08 31 23 29 55 31.3200 -97.3300 251.000 30.0 76.370 5.430 -999.990 -999.990 0.764 ..P WKT 2010 08 31 23 34 55 31.3200 -97.3300 251.000 122.0 87.318 6.530 -999.990 -999.990 0.873 ..P WKT 2010 08 31 23 39 55 31.3200 -97.3300 251.000 457.0 78.845 5.820 -999.990 -999.990 0.788 ..P WKT 2010 08 31 23 44 55 31.3200 -97.3300 251.000 30.0 78.895 6.050 -999.990 -999.990 0.789 ..P WKT 2010 08 31 23 49 55 31.3200 -97.3300 251.000 122.0 89.010 6.860 -999.990 -999.990 0.890 ..P