# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-06-02 08:40:10 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO (In Situ) # Arlyn Andrews # tel: (303) 497-6773 # email: Arlyn.Andrews@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "Blackland Research and Extension Center-Texas Agricultural # Experiment Station" without whom these measurements would not # be possible. # # URL: http://www.pinnacletowers.com/ # # Sensors were installed on the KWKT-TV transmitter tower in February # 2001. In May 2006, this site became the first to use our newly # redesigned instrumentation suite. The upgrades were made in # time for the Texas Air Quality Study 2006 . We also carried # out a demonstration study during 2006 where an O3 sensor was # mounted at our highest sampling level (457 m above ground level). # The O3 data showed clear evidence of nighttime transport of # ozone in the nocturnal jet at the top of the planetary boundary # layer. This site periodically samples air that has passed over # the Dallas - Fort Worth and Houston metropolitan areas. At other # times, the site samples relatively clean air from the Gulf of # Mexico. Summertime weather patterns are dominated by a monsoonal # circulation over the Gulf. WKT thus provides a measurement of # the initial CO2 concentration for air passing over the continent # from the south. As air moves northward, the CO2 concentration # is modified by the action of sources (fossil fuel combustion, # plant respiration, biomass burning, cement production) and sinks # (photosynthesis). Partners: Blackland Research and Extension # Center-Texas Agricultural Experiment Station (Onyango Okello). # # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # code yr mo dy hr mn sc lat lon elev(masl) ht(magl) value totunc atmvar measunc scaleunc flag WKT 2010 09 01 00 09 55 31.3200 -97.3300 251.000 457.0 80.739 7.930 -999.990 -999.990 0.807 ..P WKT 2010 09 01 00 10 25 31.3200 -97.3300 251.000 457.0 75.572 6.640 -999.990 -999.990 0.756 ..P WKT 2010 09 01 00 10 55 31.3200 -97.3300 251.000 457.0 79.215 6.610 -999.990 -999.990 0.792 ..P WKT 2010 09 01 00 11 25 31.3200 -97.3300 251.000 457.0 78.383 6.690 -999.990 -999.990 0.784 ..P WKT 2010 09 01 00 11 55 31.3200 -97.3300 251.000 457.0 75.734 6.730 -999.990 -999.990 0.757 ..P WKT 2010 09 01 00 12 25 31.3200 -97.3300 251.000 457.0 75.322 6.880 -999.990 -999.990 0.753 ..P WKT 2010 09 01 00 12 55 31.3200 -97.3300 251.000 457.0 80.922 6.680 -999.990 -999.990 0.809 ..P WKT 2010 09 01 00 13 25 31.3200 -97.3300 251.000 457.0 81.069 6.580 -999.990 -999.990 0.811 ..P WKT 2010 09 01 00 13 55 31.3200 -97.3300 251.000 457.0 81.496 6.550 -999.990 -999.990 0.815 ..P WKT 2010 09 01 00 14 25 31.3200 -97.3300 251.000 457.0 78.147 7.000 -999.990 -999.990 0.781 ..P WKT 2010 09 01 00 14 55 31.3200 -97.3300 251.000 457.0 74.379 6.790 -999.990 -999.990 0.744 ..P WKT 2010 09 01 00 19 55 31.3200 -97.3300 251.000 30.0 73.193 6.900 -999.990 -999.990 0.732 ..P WKT 2010 09 01 00 24 55 31.3200 -97.3300 251.000 122.0 81.656 6.260 -999.990 -999.990 0.817 ..P WKT 2010 09 01 00 29 55 31.3200 -97.3300 251.000 457.0 78.932 6.740 -999.990 -999.990 0.789 ..P WKT 2010 09 01 00 34 55 31.3200 -97.3300 251.000 30.0 74.251 7.180 -999.990 -999.990 0.743 ..P WKT 2010 09 01 00 39 55 31.3200 -97.3300 251.000 122.0 85.369 6.030 -999.990 -999.990 0.854 ..P WKT 2010 09 01 00 44 55 31.3200 -97.3300 251.000 457.0 79.849 6.340 -999.990 -999.990 0.798 ..P WKT 2010 09 01 00 54 55 31.3200 -97.3300 251.000 30.0 78.714 6.130 -999.990 -999.990 0.787 ..P WKT 2010 09 01 00 59 55 31.3200 -97.3300 251.000 122.0 82.539 5.910 -999.990 -999.990 0.825 ..P WKT 2010 09 01 01 04 55 31.3200 -97.3300 251.000 457.0 82.589 5.990 -999.990 -999.990 0.826 ..P WKT 2010 09 01 01 09 55 31.3200 -97.3300 251.000 30.0 85.435 5.640 -999.990 -999.990 0.854 ..P WKT 2010 09 01 01 14 55 31.3200 -97.3300 251.000 122.0 93.873 5.320 -999.990 -999.990 0.939 ..P WKT 2010 09 01 01 19 55 31.3200 -97.3300 251.000 457.0 77.708 5.240 -999.990 -999.990 0.777 ..P WKT 2010 09 01 01 29 55 31.3200 -97.3300 251.000 30.0 76.930 5.510 -999.990 -999.990 0.769 ..P WKT 2010 09 01 01 34 55 31.3200 -97.3300 251.000 122.0 89.801 5.200 -999.990 -999.990 0.898 ..P WKT 2010 09 01 01 39 55 31.3200 -97.3300 251.000 457.0 86.177 5.190 -999.990 -999.990 0.862 ..P WKT 2010 09 01 01 44 55 31.3200 -97.3300 251.000 30.0 78.919 5.850 -999.990 -999.990 0.789 ..P WKT 2010 09 01 01 49 55 31.3200 -97.3300 251.000 122.0 80.048 5.230 -999.990 -999.990 0.800 ..P WKT 2010 09 01 01 54 55 31.3200 -97.3300 251.000 457.0 70.274 5.370 -999.990 -999.990 0.703 ..P WKT 2010 09 01 02 04 55 31.3200 -97.3300 251.000 30.0 70.775 4.910 -999.990 -999.990 0.708 ..P WKT 2010 09 01 02 09 55 31.3200 -97.3300 251.000 122.0 80.210 4.960 -999.990 -999.990 0.802 ..P WKT 2010 09 01 02 14 55 31.3200 -97.3300 251.000 457.0 80.979 5.190 -999.990 -999.990 0.810 ..P WKT 2010 09 01 02 19 55 31.3200 -97.3300 251.000 30.0 79.233 5.680 -999.990 -999.990 0.792 ..P WKT 2010 09 01 02 24 55 31.3200 -97.3300 251.000 122.0 82.518 5.940 -999.990 -999.990 0.825 ..P WKT 2010 09 01 02 29 55 31.3200 -97.3300 251.000 457.0 82.169 5.570 -999.990 -999.990 0.822 ..P WKT 2010 09 01 02 39 55 31.3200 -97.3300 251.000 30.0 80.393 6.130 -999.990 -999.990 0.804 ..P WKT 2010 09 01 02 44 55 31.3200 -97.3300 251.000 122.0 87.071 5.450 -999.990 -999.990 0.871 ..P WKT 2010 09 01 02 49 55 31.3200 -97.3300 251.000 457.0 78.378 5.270 -999.990 -999.990 0.784 ..P WKT 2010 09 01 02 54 55 31.3200 -97.3300 251.000 30.0 84.497 5.030 -999.990 -999.990 0.845 ..P WKT 2010 09 01 02 59 55 31.3200 -97.3300 251.000 122.0 89.778 4.830 -999.990 -999.990 0.898 ..P WKT 2010 09 01 03 04 55 31.3200 -97.3300 251.000 457.0 77.451 4.750 -999.990 -999.990 0.775 ..P WKT 2010 09 01 03 14 55 31.3200 -97.3300 251.000 30.0 82.842 5.030 -999.990 -999.990 0.828 ..P WKT 2010 09 01 03 19 55 31.3200 -97.3300 251.000 122.0 91.196 4.990 -999.990 -999.990 0.912 ..P WKT 2010 09 01 03 24 55 31.3200 -97.3300 251.000 457.0 72.164 5.460 -999.990 -999.990 0.722 ..P WKT 2010 09 01 03 29 55 31.3200 -97.3300 251.000 30.0 86.945 4.600 -999.990 -999.990 0.869 ..P WKT 2010 09 01 03 34 55 31.3200 -97.3300 251.000 122.0 109.410 5.750 -999.990 -999.990 1.094 ..P WKT 2010 09 01 03 39 55 31.3200 -97.3300 251.000 457.0 70.260 5.220 -999.990 -999.990 0.703 ..P WKT 2010 09 01 03 49 55 31.3200 -97.3300 251.000 30.0 105.129 5.380 -999.990 -999.990 1.051 ..P WKT 2010 09 01 03 54 55 31.3200 -97.3300 251.000 122.0 101.607 4.740 -999.990 -999.990 1.016 ..P WKT 2010 09 01 03 59 55 31.3200 -97.3300 251.000 457.0 77.269 4.850 -999.990 -999.990 0.773 ..P WKT 2010 09 01 04 04 55 31.3200 -97.3300 251.000 30.0 97.636 4.880 -999.990 -999.990 0.976 ..P WKT 2010 09 01 04 09 55 31.3200 -97.3300 251.000 122.0 100.121 4.930 -999.990 -999.990 1.001 ..P WKT 2010 09 01 04 14 55 31.3200 -97.3300 251.000 457.0 73.828 4.540 -999.990 -999.990 0.738 ..P WKT 2010 09 01 04 24 55 31.3200 -97.3300 251.000 30.0 103.244 4.650 -999.990 -999.990 1.032 ..P WKT 2010 09 01 04 29 55 31.3200 -97.3300 251.000 122.0 102.516 5.580 -999.990 -999.990 1.025 ..P WKT 2010 09 01 04 34 55 31.3200 -97.3300 251.000 457.0 78.879 4.950 -999.990 -999.990 0.789 ..P WKT 2010 09 01 04 39 55 31.3200 -97.3300 251.000 30.0 99.383 5.470 -999.990 -999.990 0.994 ..P WKT 2010 09 01 04 44 55 31.3200 -97.3300 251.000 122.0 95.583 4.830 -999.990 -999.990 0.956 ..P WKT 2010 09 01 04 49 55 31.3200 -97.3300 251.000 457.0 76.557 5.580 -999.990 -999.990 0.766 ..P WKT 2010 09 01 05 04 55 31.3200 -97.3300 251.000 30.0 93.484 5.130 -999.990 -999.990 0.935 ..P WKT 2010 09 01 05 09 55 31.3200 -97.3300 251.000 122.0 92.114 4.720 -999.990 -999.990 0.921 ..P WKT 2010 09 01 05 14 55 31.3200 -97.3300 251.000 457.0 72.589 5.910 -999.990 -999.990 0.726 ..P WKT 2010 09 01 05 19 55 31.3200 -97.3300 251.000 30.0 87.142 4.420 -999.990 -999.990 0.871 ..P WKT 2010 09 01 05 24 55 31.3200 -97.3300 251.000 122.0 89.964 4.410 -999.990 -999.990 0.900 ..P WKT 2010 09 01 05 29 55 31.3200 -97.3300 251.000 457.0 78.260 4.340 -999.990 -999.990 0.783 ..P WKT 2010 09 01 05 39 55 31.3200 -97.3300 251.000 30.0 80.893 4.170 -999.990 -999.990 0.809 ..P WKT 2010 09 01 05 44 55 31.3200 -97.3300 251.000 122.0 82.379 4.990 -999.990 -999.990 0.824 ..P WKT 2010 09 01 05 49 55 31.3200 -97.3300 251.000 457.0 74.929 4.230 -999.990 -999.990 0.749 ..P WKT 2010 09 01 05 54 55 31.3200 -97.3300 251.000 30.0 76.974 4.820 -999.990 -999.990 0.770 ..P WKT 2010 09 01 05 59 55 31.3200 -97.3300 251.000 122.0 77.903 4.220 -999.990 -999.990 0.779 ..P WKT 2010 09 01 06 04 55 31.3200 -97.3300 251.000 457.0 77.435 4.180 -999.990 -999.990 0.774 ..P WKT 2010 09 01 06 14 55 31.3200 -97.3300 251.000 30.0 74.504 4.400 -999.990 -999.990 0.745 ..P WKT 2010 09 01 06 19 55 31.3200 -97.3300 251.000 122.0 79.302 5.020 -999.990 -999.990 0.793 ..P WKT 2010 09 01 06 24 55 31.3200 -97.3300 251.000 457.0 75.163 4.960 -999.990 -999.990 0.752 ..P WKT 2010 09 01 06 29 55 31.3200 -97.3300 251.000 30.0 79.403 4.250 -999.990 -999.990 0.794 ..P WKT 2010 09 01 06 34 55 31.3200 -97.3300 251.000 122.0 81.407 4.550 -999.990 -999.990 0.814 ..P WKT 2010 09 01 06 39 55 31.3200 -97.3300 251.000 457.0 78.387 4.670 -999.990 -999.990 0.784 ..P WKT 2010 09 01 06 49 55 31.3200 -97.3300 251.000 30.0 74.778 4.820 -999.990 -999.990 0.748 ..P WKT 2010 09 01 06 54 55 31.3200 -97.3300 251.000 122.0 80.333 4.260 -999.990 -999.990 0.803 ..P WKT 2010 09 01 06 59 55 31.3200 -97.3300 251.000 457.0 73.185 5.080 -999.990 -999.990 0.732 ..P WKT 2010 09 01 07 04 55 31.3200 -97.3300 251.000 30.0 70.224 4.570 -999.990 -999.990 0.702 ..P WKT 2010 09 01 07 09 55 31.3200 -97.3300 251.000 122.0 80.385 5.280 -999.990 -999.990 0.804 ..P WKT 2010 09 01 07 14 55 31.3200 -97.3300 251.000 457.0 66.397 4.370 -999.990 -999.990 0.664 ..P WKT 2010 09 01 07 24 55 31.3200 -97.3300 251.000 30.0 76.987 4.600 -999.990 -999.990 0.770 ..P WKT 2010 09 01 07 29 55 31.3200 -97.3300 251.000 122.0 84.814 4.620 -999.990 -999.990 0.848 ..P WKT 2010 09 01 07 34 55 31.3200 -97.3300 251.000 457.0 67.238 4.050 -999.990 -999.990 0.672 ..P WKT 2010 09 01 07 39 55 31.3200 -97.3300 251.000 30.0 83.020 4.500 -999.990 -999.990 0.830 ..P WKT 2010 09 01 07 44 55 31.3200 -97.3300 251.000 122.0 83.869 4.280 -999.990 -999.990 0.839 ..P WKT 2010 09 01 07 49 55 31.3200 -97.3300 251.000 457.0 65.734 5.160 -999.990 -999.990 0.657 ..P WKT 2010 09 01 07 59 55 31.3200 -97.3300 251.000 30.0 75.925 3.910 -999.990 -999.990 0.759 ..P WKT 2010 09 01 08 04 55 31.3200 -97.3300 251.000 122.0 74.519 4.960 -999.990 -999.990 0.745 ..P WKT 2010 09 01 08 09 55 31.3200 -97.3300 251.000 457.0 58.461 4.340 -999.990 -999.990 0.585 ..P WKT 2010 09 01 08 14 55 31.3200 -97.3300 251.000 30.0 69.477 4.880 -999.990 -999.990 0.695 ..P WKT 2010 09 01 08 19 55 31.3200 -97.3300 251.000 122.0 77.841 4.590 -999.990 -999.990 0.778 ..P WKT 2010 09 01 08 24 55 31.3200 -97.3300 251.000 457.0 57.597 7.260 -999.990 -999.990 0.576 ..P WKT 2010 09 01 08 34 55 31.3200 -97.3300 251.000 30.0 74.903 4.130 -999.990 -999.990 0.749 ..P WKT 2010 09 01 08 39 55 31.3200 -97.3300 251.000 122.0 83.287 6.600 -999.990 -999.990 0.833 ..P WKT 2010 09 01 08 44 55 31.3200 -97.3300 251.000 457.0 62.226 5.470 -999.990 -999.990 0.622 ..P WKT 2010 09 01 08 49 55 31.3200 -97.3300 251.000 30.0 77.726 4.360 -999.990 -999.990 0.777 ..P WKT 2010 09 01 08 54 55 31.3200 -97.3300 251.000 122.0 81.086 4.300 -999.990 -999.990 0.811 ..P WKT 2010 09 01 08 59 55 31.3200 -97.3300 251.000 457.0 68.818 4.020 -999.990 -999.990 0.688 ..P WKT 2010 09 01 09 09 55 31.3200 -97.3300 251.000 30.0 79.582 3.820 -999.990 -999.990 0.796 ..P WKT 2010 09 01 09 14 55 31.3200 -97.3300 251.000 122.0 80.710 4.890 -999.990 -999.990 0.807 ..P WKT 2010 09 01 09 19 55 31.3200 -97.3300 251.000 457.0 70.395 4.140 -999.990 -999.990 0.704 ..P WKT 2010 09 01 09 24 55 31.3200 -97.3300 251.000 30.0 81.289 4.640 -999.990 -999.990 0.813 ..P WKT 2010 09 01 09 29 55 31.3200 -97.3300 251.000 122.0 78.230 4.610 -999.990 -999.990 0.782 ..P WKT 2010 09 01 09 34 55 31.3200 -97.3300 251.000 457.0 68.196 3.680 -999.990 -999.990 0.682 ..P WKT 2010 09 01 09 44 55 31.3200 -97.3300 251.000 30.0 78.621 4.300 -999.990 -999.990 0.786 ..P WKT 2010 09 01 09 49 55 31.3200 -97.3300 251.000 122.0 82.059 3.890 -999.990 -999.990 0.821 ..P WKT 2010 09 01 09 54 55 31.3200 -97.3300 251.000 457.0 66.805 4.710 -999.990 -999.990 0.668 ..P WKT 2010 09 01 09 59 55 31.3200 -97.3300 251.000 30.0 70.522 3.830 -999.990 -999.990 0.705 ..P WKT 2010 09 01 10 04 55 31.3200 -97.3300 251.000 122.0 81.772 3.880 -999.990 -999.990 0.818 ..P WKT 2010 09 01 10 09 55 31.3200 -97.3300 251.000 457.0 65.403 4.830 -999.990 -999.990 0.654 ..P WKT 2010 09 01 10 19 55 31.3200 -97.3300 251.000 30.0 81.525 4.180 -999.990 -999.990 0.815 ..P WKT 2010 09 01 10 24 55 31.3200 -97.3300 251.000 122.0 75.518 5.070 -999.990 -999.990 0.755 ..P WKT 2010 09 01 10 29 55 31.3200 -97.3300 251.000 457.0 65.884 5.150 -999.990 -999.990 0.659 ..P WKT 2010 09 01 10 34 55 31.3200 -97.3300 251.000 30.0 75.220 4.340 -999.990 -999.990 0.752 ..P WKT 2010 09 01 10 39 55 31.3200 -97.3300 251.000 122.0 81.487 3.940 -999.990 -999.990 0.815 ..P WKT 2010 09 01 10 44 55 31.3200 -97.3300 251.000 457.0 69.623 4.160 -999.990 -999.990 0.696 ..P WKT 2010 09 01 10 54 55 31.3200 -97.3300 251.000 30.0 74.048 4.090 -999.990 -999.990 0.740 ..P WKT 2010 09 01 10 59 55 31.3200 -97.3300 251.000 122.0 84.199 4.140 -999.990 -999.990 0.842 ..P WKT 2010 09 01 11 04 55 31.3200 -97.3300 251.000 457.0 70.503 4.070 -999.990 -999.990 0.705 ..P WKT 2010 09 01 11 09 55 31.3200 -97.3300 251.000 30.0 77.308 3.980 -999.990 -999.990 0.773 ..P WKT 2010 09 01 11 14 55 31.3200 -97.3300 251.000 122.0 78.255 3.900 -999.990 -999.990 0.783 ..P WKT 2010 09 01 11 19 55 31.3200 -97.3300 251.000 457.0 72.230 4.360 -999.990 -999.990 0.722 ..P WKT 2010 09 01 11 29 55 31.3200 -97.3300 251.000 30.0 79.759 5.470 -999.990 -999.990 0.798 ..P WKT 2010 09 01 11 34 55 31.3200 -97.3300 251.000 122.0 79.508 4.350 -999.990 -999.990 0.795 ..P WKT 2010 09 01 11 39 55 31.3200 -97.3300 251.000 457.0 64.476 3.880 -999.990 -999.990 0.645 ..P WKT 2010 09 01 11 44 55 31.3200 -97.3300 251.000 30.0 83.886 4.090 -999.990 -999.990 0.839 ..P WKT 2010 09 01 11 49 55 31.3200 -97.3300 251.000 122.0 81.544 3.950 -999.990 -999.990 0.815 ..P WKT 2010 09 01 12 09 55 31.3200 -97.3300 251.000 457.0 58.005 5.120 -999.990 -999.990 0.580 ..P WKT 2010 09 01 12 10 25 31.3200 -97.3300 251.000 457.0 65.333 3.820 -999.990 -999.990 0.653 ..P WKT 2010 09 01 12 10 55 31.3200 -97.3300 251.000 457.0 63.600 4.120 -999.990 -999.990 0.636 ..P WKT 2010 09 01 12 11 25 31.3200 -97.3300 251.000 457.0 61.169 4.950 -999.990 -999.990 0.612 ..P WKT 2010 09 01 12 11 55 31.3200 -97.3300 251.000 457.0 68.915 5.030 -999.990 -999.990 0.689 ..P WKT 2010 09 01 12 12 25 31.3200 -97.3300 251.000 457.0 64.952 4.210 -999.990 -999.990 0.650 ..P WKT 2010 09 01 12 12 55 31.3200 -97.3300 251.000 457.0 61.547 4.880 -999.990 -999.990 0.615 ..P WKT 2010 09 01 12 13 25 31.3200 -97.3300 251.000 457.0 61.765 4.470 -999.990 -999.990 0.618 ..P WKT 2010 09 01 12 13 55 31.3200 -97.3300 251.000 457.0 65.050 4.930 -999.990 -999.990 0.650 ..P WKT 2010 09 01 12 14 25 31.3200 -97.3300 251.000 457.0 54.397 4.320 -999.990 -999.990 0.544 ..P WKT 2010 09 01 12 14 55 31.3200 -97.3300 251.000 457.0 62.700 4.740 -999.990 -999.990 0.627 ..P WKT 2010 09 01 12 19 55 31.3200 -97.3300 251.000 30.0 86.067 4.950 -999.990 -999.990 0.861 ..P WKT 2010 09 01 12 24 55 31.3200 -97.3300 251.000 122.0 86.437 4.190 -999.990 -999.990 0.864 ..P WKT 2010 09 01 12 29 55 31.3200 -97.3300 251.000 457.0 63.957 4.880 -999.990 -999.990 0.640 ..P WKT 2010 09 01 12 34 55 31.3200 -97.3300 251.000 30.0 83.138 4.530 -999.990 -999.990 0.831 ..P WKT 2010 09 01 12 39 55 31.3200 -97.3300 251.000 122.0 74.871 4.360 -999.990 -999.990 0.749 ..P WKT 2010 09 01 12 44 55 31.3200 -97.3300 251.000 457.0 61.315 4.330 -999.990 -999.990 0.613 ..P WKT 2010 09 01 12 54 55 31.3200 -97.3300 251.000 30.0 73.844 4.800 -999.990 -999.990 0.738 ..P WKT 2010 09 01 12 59 55 31.3200 -97.3300 251.000 122.0 73.605 3.900 -999.990 -999.990 0.736 ..P WKT 2010 09 01 13 04 55 31.3200 -97.3300 251.000 457.0 55.826 4.530 -999.990 -999.990 0.558 ..P WKT 2010 09 01 13 09 55 31.3200 -97.3300 251.000 30.0 69.510 3.500 -999.990 -999.990 0.695 ..P WKT 2010 09 01 13 14 55 31.3200 -97.3300 251.000 122.0 74.004 3.450 -999.990 -999.990 0.740 ..P WKT 2010 09 01 13 19 55 31.3200 -97.3300 251.000 457.0 65.694 3.420 -999.990 -999.990 0.657 ..P WKT 2010 09 01 13 29 55 31.3200 -97.3300 251.000 30.0 71.181 3.200 -999.990 -999.990 0.712 ..P WKT 2010 09 01 13 34 55 31.3200 -97.3300 251.000 122.0 78.853 3.250 -999.990 -999.990 0.789 ..P WKT 2010 09 01 13 39 55 31.3200 -97.3300 251.000 457.0 61.764 3.580 -999.990 -999.990 0.618 ..P WKT 2010 09 01 13 44 55 31.3200 -97.3300 251.000 30.0 82.230 4.090 -999.990 -999.990 0.822 ..P WKT 2010 09 01 13 49 55 31.3200 -97.3300 251.000 122.0 78.772 3.330 -999.990 -999.990 0.788 ..P WKT 2010 09 01 13 54 55 31.3200 -97.3300 251.000 457.0 66.695 4.060 -999.990 -999.990 0.667 ..P WKT 2010 09 01 14 04 55 31.3200 -97.3300 251.000 30.0 81.155 3.110 -999.990 -999.990 0.812 ..P WKT 2010 09 01 14 09 55 31.3200 -97.3300 251.000 122.0 83.219 3.580 -999.990 -999.990 0.832 ..P WKT 2010 09 01 14 14 55 31.3200 -97.3300 251.000 457.0 60.266 4.090 -999.990 -999.990 0.603 ..P WKT 2010 09 01 14 19 55 31.3200 -97.3300 251.000 30.0 69.003 3.180 -999.990 -999.990 0.690 ..P WKT 2010 09 01 14 24 55 31.3200 -97.3300 251.000 122.0 74.958 3.520 -999.990 -999.990 0.750 ..P WKT 2010 09 01 14 29 55 31.3200 -97.3300 251.000 457.0 66.464 3.650 -999.990 -999.990 0.665 ..P WKT 2010 09 01 14 39 55 31.3200 -97.3300 251.000 30.0 73.014 3.650 -999.990 -999.990 0.730 ..P WKT 2010 09 01 14 44 55 31.3200 -97.3300 251.000 122.0 82.220 3.410 -999.990 -999.990 0.822 ..P WKT 2010 09 01 14 49 55 31.3200 -97.3300 251.000 457.0 66.706 3.780 -999.990 -999.990 0.667 ..P WKT 2010 09 01 14 54 55 31.3200 -97.3300 251.000 30.0 75.494 4.220 -999.990 -999.990 0.755 ..P WKT 2010 09 01 14 59 55 31.3200 -97.3300 251.000 122.0 81.503 4.470 -999.990 -999.990 0.815 ..P WKT 2010 09 01 15 04 55 31.3200 -97.3300 251.000 457.0 70.159 4.260 -999.990 -999.990 0.702 ..P WKT 2010 09 01 15 14 55 31.3200 -97.3300 251.000 30.0 68.099 4.000 -999.990 -999.990 0.681 ..P WKT 2010 09 01 15 19 55 31.3200 -97.3300 251.000 122.0 87.091 4.780 -999.990 -999.990 0.871 ..P WKT 2010 09 01 15 24 55 31.3200 -97.3300 251.000 457.0 69.865 5.160 -999.990 -999.990 0.699 ..P WKT 2010 09 01 15 29 55 31.3200 -97.3300 251.000 30.0 77.753 3.920 -999.990 -999.990 0.778 ..P WKT 2010 09 01 15 34 55 31.3200 -97.3300 251.000 122.0 86.888 3.340 -999.990 -999.990 0.869 ..P WKT 2010 09 01 15 39 55 31.3200 -97.3300 251.000 457.0 77.713 3.100 -999.990 -999.990 0.777 ..P WKT 2010 09 01 15 49 55 31.3200 -97.3300 251.000 30.0 70.441 3.680 -999.990 -999.990 0.704 ..P WKT 2010 09 01 15 54 55 31.3200 -97.3300 251.000 122.0 85.100 3.470 -999.990 -999.990 0.851 ..P WKT 2010 09 01 15 59 55 31.3200 -97.3300 251.000 457.0 75.632 3.630 -999.990 -999.990 0.756 ..P WKT 2010 09 01 16 04 55 31.3200 -97.3300 251.000 30.0 70.186 3.200 -999.990 -999.990 0.702 ..P WKT 2010 09 01 16 09 55 31.3200 -97.3300 251.000 122.0 77.354 3.450 -999.990 -999.990 0.774 ..P WKT 2010 09 01 16 14 55 31.3200 -97.3300 251.000 457.0 72.464 3.760 -999.990 -999.990 0.725 ..P WKT 2010 09 01 16 24 55 31.3200 -97.3300 251.000 30.0 76.225 3.650 -999.990 -999.990 0.762 ..P WKT 2010 09 01 16 29 55 31.3200 -97.3300 251.000 122.0 80.718 3.500 -999.990 -999.990 0.807 ..P WKT 2010 09 01 16 34 55 31.3200 -97.3300 251.000 457.0 76.344 3.990 -999.990 -999.990 0.763 ..P WKT 2010 09 01 16 39 55 31.3200 -97.3300 251.000 30.0 73.494 3.460 -999.990 -999.990 0.735 ..P WKT 2010 09 01 16 44 55 31.3200 -97.3300 251.000 122.0 85.741 4.250 -999.990 -999.990 0.857 ..P WKT 2010 09 01 16 49 55 31.3200 -97.3300 251.000 457.0 82.337 4.750 -999.990 -999.990 0.823 ..P WKT 2010 09 01 17 04 55 31.3200 -97.3300 251.000 30.0 74.158 3.690 -999.990 -999.990 0.742 ..P WKT 2010 09 01 17 09 55 31.3200 -97.3300 251.000 122.0 80.144 3.340 -999.990 -999.990 0.801 ..P WKT 2010 09 01 17 14 55 31.3200 -97.3300 251.000 457.0 66.478 3.610 -999.990 -999.990 0.665 ..P WKT 2010 09 01 17 19 55 31.3200 -97.3300 251.000 30.0 72.187 4.000 -999.990 -999.990 0.722 ..P WKT 2010 09 01 17 24 55 31.3200 -97.3300 251.000 122.0 78.171 3.260 -999.990 -999.990 0.782 ..P WKT 2010 09 01 17 29 55 31.3200 -97.3300 251.000 457.0 68.107 3.140 -999.990 -999.990 0.681 ..P WKT 2010 09 01 17 39 55 31.3200 -97.3300 251.000 30.0 67.016 3.160 -999.990 -999.990 0.670 ..P WKT 2010 09 01 17 44 55 31.3200 -97.3300 251.000 122.0 82.071 3.540 -999.990 -999.990 0.821 ..P WKT 2010 09 01 17 49 55 31.3200 -97.3300 251.000 457.0 70.021 3.580 -999.990 -999.990 0.700 ..P WKT 2010 09 01 17 54 55 31.3200 -97.3300 251.000 30.0 68.758 4.040 -999.990 -999.990 0.688 ..P WKT 2010 09 01 17 59 55 31.3200 -97.3300 251.000 122.0 77.171 5.270 -999.990 -999.990 0.772 ..P WKT 2010 09 01 18 04 55 31.3200 -97.3300 251.000 457.0 72.313 3.700 -999.990 -999.990 0.723 ..P WKT 2010 09 01 18 14 55 31.3200 -97.3300 251.000 30.0 75.295 3.310 -999.990 -999.990 0.753 ..P WKT 2010 09 01 18 19 55 31.3200 -97.3300 251.000 122.0 78.157 3.990 -999.990 -999.990 0.782 ..P WKT 2010 09 01 18 24 55 31.3200 -97.3300 251.000 457.0 71.071 4.710 -999.990 -999.990 0.711 ..P WKT 2010 09 01 18 29 55 31.3200 -97.3300 251.000 30.0 77.802 3.310 -999.990 -999.990 0.778 ..P WKT 2010 09 01 18 34 55 31.3200 -97.3300 251.000 122.0 90.055 3.780 -999.990 -999.990 0.901 ..P WKT 2010 09 01 18 39 55 31.3200 -97.3300 251.000 457.0 76.065 2.870 -999.990 -999.990 0.761 ..P WKT 2010 09 01 18 49 55 31.3200 -97.3300 251.000 30.0 76.656 3.050 -999.990 -999.990 0.767 ..P WKT 2010 09 01 18 54 55 31.3200 -97.3300 251.000 122.0 86.813 3.330 -999.990 -999.990 0.868 ..P WKT 2010 09 01 18 59 55 31.3200 -97.3300 251.000 457.0 72.949 3.440 -999.990 -999.990 0.729 ..P WKT 2010 09 01 19 04 55 31.3200 -97.3300 251.000 30.0 75.098 4.920 -999.990 -999.990 0.751 ..P WKT 2010 09 01 19 09 55 31.3200 -97.3300 251.000 122.0 87.459 4.620 -999.990 -999.990 0.875 ..P WKT 2010 09 01 19 14 55 31.3200 -97.3300 251.000 457.0 77.463 3.250 -999.990 -999.990 0.775 ..P WKT 2010 09 01 19 24 55 31.3200 -97.3300 251.000 30.0 81.385 3.660 -999.990 -999.990 0.814 ..P WKT 2010 09 01 19 29 55 31.3200 -97.3300 251.000 122.0 84.124 3.840 -999.990 -999.990 0.841 ..P WKT 2010 09 01 19 34 55 31.3200 -97.3300 251.000 457.0 74.586 5.320 -999.990 -999.990 0.746 ..P WKT 2010 09 01 19 39 55 31.3200 -97.3300 251.000 30.0 72.084 5.330 -999.990 -999.990 0.721 ..P WKT 2010 09 01 19 44 55 31.3200 -97.3300 251.000 122.0 84.613 4.510 -999.990 -999.990 0.846 ..P WKT 2010 09 01 19 49 55 31.3200 -97.3300 251.000 457.0 72.045 3.390 -999.990 -999.990 0.720 ..P WKT 2010 09 01 19 59 55 31.3200 -97.3300 251.000 30.0 73.799 4.850 -999.990 -999.990 0.738 ..P WKT 2010 09 01 20 04 55 31.3200 -97.3300 251.000 122.0 84.530 4.520 -999.990 -999.990 0.845 ..P WKT 2010 09 01 20 09 55 31.3200 -97.3300 251.000 457.0 72.381 5.020 -999.990 -999.990 0.724 ..P WKT 2010 09 01 20 14 55 31.3200 -97.3300 251.000 30.0 77.599 5.110 -999.990 -999.990 0.776 ..P WKT 2010 09 01 20 19 55 31.3200 -97.3300 251.000 122.0 81.574 4.200 -999.990 -999.990 0.816 ..P WKT 2010 09 01 20 24 55 31.3200 -97.3300 251.000 457.0 76.594 3.360 -999.990 -999.990 0.766 ..P WKT 2010 09 01 20 34 55 31.3200 -97.3300 251.000 30.0 75.374 3.050 -999.990 -999.990 0.754 ..P WKT 2010 09 01 20 39 55 31.3200 -97.3300 251.000 122.0 87.670 4.090 -999.990 -999.990 0.877 ..P WKT 2010 09 01 20 44 55 31.3200 -97.3300 251.000 457.0 75.866 4.570 -999.990 -999.990 0.759 ..P WKT 2010 09 01 20 49 55 31.3200 -97.3300 251.000 30.0 73.427 3.940 -999.990 -999.990 0.734 ..P WKT 2010 09 01 20 54 55 31.3200 -97.3300 251.000 122.0 87.509 3.660 -999.990 -999.990 0.875 ..P WKT 2010 09 01 20 59 55 31.3200 -97.3300 251.000 457.0 78.461 3.260 -999.990 -999.990 0.785 ..P WKT 2010 09 01 21 09 55 31.3200 -97.3300 251.000 30.0 73.782 2.900 -999.990 -999.990 0.738 ..P WKT 2010 09 01 21 14 55 31.3200 -97.3300 251.000 122.0 88.053 3.920 -999.990 -999.990 0.881 ..P WKT 2010 09 01 21 19 55 31.3200 -97.3300 251.000 457.0 78.381 4.030 -999.990 -999.990 0.784 ..P WKT 2010 09 01 21 24 55 31.3200 -97.3300 251.000 30.0 79.167 3.670 -999.990 -999.990 0.792 ..P WKT 2010 09 01 21 29 55 31.3200 -97.3300 251.000 122.0 86.831 4.540 -999.990 -999.990 0.868 ..P WKT 2010 09 01 21 34 55 31.3200 -97.3300 251.000 457.0 76.062 3.290 -999.990 -999.990 0.761 ..P WKT 2010 09 01 21 44 55 31.3200 -97.3300 251.000 30.0 82.191 3.400 -999.990 -999.990 0.822 ..P WKT 2010 09 01 21 49 55 31.3200 -97.3300 251.000 122.0 94.957 4.260 -999.990 -999.990 0.950 ..P WKT 2010 09 01 21 54 55 31.3200 -97.3300 251.000 457.0 86.824 3.460 -999.990 -999.990 0.868 ..P WKT 2010 09 01 21 59 55 31.3200 -97.3300 251.000 30.0 83.366 3.140 -999.990 -999.990 0.834 ..P WKT 2010 09 01 22 04 55 31.3200 -97.3300 251.000 122.0 87.607 3.390 -999.990 -999.990 0.876 ..P WKT 2010 09 01 22 09 55 31.3200 -97.3300 251.000 457.0 79.203 2.840 -999.990 -999.990 0.792 ..P WKT 2010 09 01 22 19 55 31.3200 -97.3300 251.000 30.0 76.062 2.840 -999.990 -999.990 0.761 ..P WKT 2010 09 01 22 24 55 31.3200 -97.3300 251.000 122.0 87.365 3.180 -999.990 -999.990 0.874 ..P WKT 2010 09 01 22 29 55 31.3200 -97.3300 251.000 457.0 80.535 2.680 -999.990 -999.990 0.805 ..P WKT 2010 09 01 22 34 55 31.3200 -97.3300 251.000 30.0 75.080 3.020 -999.990 -999.990 0.751 ..P WKT 2010 09 01 22 39 55 31.3200 -97.3300 251.000 122.0 85.557 3.500 -999.990 -999.990 0.856 ..P WKT 2010 09 01 22 44 55 31.3200 -97.3300 251.000 457.0 85.869 2.940 -999.990 -999.990 0.859 ..P WKT 2010 09 01 22 54 55 31.3200 -97.3300 251.000 30.0 78.767 3.160 -999.990 -999.990 0.788 ..P WKT 2010 09 01 22 59 55 31.3200 -97.3300 251.000 122.0 89.885 2.690 -999.990 -999.990 0.899 ..P WKT 2010 09 01 23 04 55 31.3200 -97.3300 251.000 457.0 82.609 2.500 -999.990 -999.990 0.826 ..P WKT 2010 09 01 23 09 55 31.3200 -97.3300 251.000 30.0 79.864 3.830 -999.990 -999.990 0.799 ..P WKT 2010 09 01 23 14 55 31.3200 -97.3300 251.000 122.0 89.331 3.050 -999.990 -999.990 0.893 ..P WKT 2010 09 01 23 19 55 31.3200 -97.3300 251.000 457.0 79.863 2.730 -999.990 -999.990 0.799 ..P WKT 2010 09 01 23 29 55 31.3200 -97.3300 251.000 30.0 83.754 3.090 -999.990 -999.990 0.838 ..P WKT 2010 09 01 23 34 55 31.3200 -97.3300 251.000 122.0 97.519 4.690 -999.990 -999.990 0.975 ..P WKT 2010 09 01 23 39 55 31.3200 -97.3300 251.000 457.0 88.243 2.590 -999.990 -999.990 0.882 ..P WKT 2010 09 01 23 44 55 31.3200 -97.3300 251.000 30.0 88.156 3.670 -999.990 -999.990 0.882 ..P WKT 2010 09 01 23 49 55 31.3200 -97.3300 251.000 122.0 97.254 3.590 -999.990 -999.990 0.973 ..P WKT 2010 09 02 00 09 55 31.3200 -97.3300 251.000 457.0 84.282 2.510 -999.990 -999.990 0.843 ..P WKT 2010 09 02 00 10 25 31.3200 -97.3300 251.000 457.0 82.038 3.410 -999.990 -999.990 0.820 ..P WKT 2010 09 02 00 10 55 31.3200 -97.3300 251.000 457.0 85.002 2.690 -999.990 -999.990 0.850 ..P WKT 2010 09 02 00 11 25 31.3200 -97.3300 251.000 457.0 88.652 3.830 -999.990 -999.990 0.887 ..P WKT 2010 09 02 00 11 55 31.3200 -97.3300 251.000 457.0 94.769 2.890 -999.990 -999.990 0.948 ..P WKT 2010 09 02 00 12 25 31.3200 -97.3300 251.000 457.0 91.428 2.590 -999.990 -999.990 0.914 ..P WKT 2010 09 02 00 12 55 31.3200 -97.3300 251.000 457.0 92.337 2.480 -999.990 -999.990 0.923 ..P WKT 2010 09 02 00 13 25 31.3200 -97.3300 251.000 457.0 91.463 3.530 -999.990 -999.990 0.915 ..P WKT 2010 09 02 00 13 55 31.3200 -97.3300 251.000 457.0 86.339 2.250 -999.990 -999.990 0.863 ..P WKT 2010 09 02 00 14 25 31.3200 -97.3300 251.000 457.0 88.618 2.560 -999.990 -999.990 0.886 ..P WKT 2010 09 02 00 14 55 31.3200 -97.3300 251.000 457.0 91.034 2.390 -999.990 -999.990 0.910 ..P WKT 2010 09 02 00 19 55 31.3200 -97.3300 251.000 30.0 85.723 3.360 -999.990 -999.990 0.857 ..P WKT 2010 09 02 00 24 55 31.3200 -97.3300 251.000 122.0 83.427 2.990 -999.990 -999.990 0.834 ..P WKT 2010 09 02 00 29 55 31.3200 -97.3300 251.000 457.0 84.970 2.490 -999.990 -999.990 0.850 ..P WKT 2010 09 02 00 34 55 31.3200 -97.3300 251.000 30.0 87.200 2.500 -999.990 -999.990 0.872 ..P WKT 2010 09 02 00 39 55 31.3200 -97.3300 251.000 122.0 91.074 3.340 -999.990 -999.990 0.911 ..P WKT 2010 09 02 00 44 55 31.3200 -97.3300 251.000 457.0 85.624 2.390 -999.990 -999.990 0.856 ..P WKT 2010 09 02 00 54 55 31.3200 -97.3300 251.000 30.0 85.076 2.510 -999.990 -999.990 0.851 ..P WKT 2010 09 02 00 59 55 31.3200 -97.3300 251.000 122.0 88.607 3.790 -999.990 -999.990 0.886 ..P WKT 2010 09 02 01 04 55 31.3200 -97.3300 251.000 457.0 87.201 3.770 -999.990 -999.990 0.872 ..P WKT 2010 09 02 01 09 55 31.3200 -97.3300 251.000 30.0 89.361 3.000 -999.990 -999.990 0.894 ..P WKT 2010 09 02 01 14 55 31.3200 -97.3300 251.000 122.0 92.619 2.940 -999.990 -999.990 0.926 ..P WKT 2010 09 02 01 19 55 31.3200 -97.3300 251.000 457.0 86.548 4.170 -999.990 -999.990 0.865 ..P WKT 2010 09 02 01 29 55 31.3200 -97.3300 251.000 30.0 92.398 3.870 -999.990 -999.990 0.924 ..P WKT 2010 09 02 01 34 55 31.3200 -97.3300 251.000 122.0 93.618 4.560 -999.990 -999.990 0.936 ..P WKT 2010 09 02 01 39 55 31.3200 -97.3300 251.000 457.0 90.173 5.410 -999.990 -999.990 0.902 ..P WKT 2010 09 02 01 44 55 31.3200 -97.3300 251.000 30.0 92.216 5.120 -999.990 -999.990 0.922 ..P WKT 2010 09 02 01 49 55 31.3200 -97.3300 251.000 122.0 99.200 5.150 -999.990 -999.990 0.992 ..P WKT 2010 09 02 01 54 55 31.3200 -97.3300 251.000 457.0 100.969 3.100 -999.990 -999.990 1.010 ..P WKT 2010 09 02 02 04 55 31.3200 -97.3300 251.000 30.0 95.177 3.250 -999.990 -999.990 0.952 ..P WKT 2010 09 02 02 09 55 31.3200 -97.3300 251.000 122.0 102.162 5.410 -999.990 -999.990 1.022 ..P WKT 2010 09 02 02 14 55 31.3200 -97.3300 251.000 457.0 97.343 5.050 -999.990 -999.990 0.973 ..P WKT 2010 09 02 02 19 55 31.3200 -97.3300 251.000 30.0 92.250 4.000 -999.990 -999.990 0.922 ..P WKT 2010 09 02 02 24 55 31.3200 -97.3300 251.000 122.0 103.904 3.070 -999.990 -999.990 1.039 ..P WKT 2010 09 02 02 29 55 31.3200 -97.3300 251.000 457.0 101.968 3.350 -999.990 -999.990 1.020 ..P WKT 2010 09 02 02 39 55 31.3200 -97.3300 251.000 30.0 114.826 2.930 -999.990 -999.990 1.148 ..P WKT 2010 09 02 02 44 55 31.3200 -97.3300 251.000 122.0 128.799 3.090 -999.990 -999.990 1.288 ..P WKT 2010 09 02 02 49 55 31.3200 -97.3300 251.000 457.0 122.724 4.080 -999.990 -999.990 1.227 ..P WKT 2010 09 02 02 54 55 31.3200 -97.3300 251.000 30.0 136.973 3.560 -999.990 -999.990 1.370 ..P WKT 2010 09 02 02 59 55 31.3200 -97.3300 251.000 122.0 135.567 4.110 -999.990 -999.990 1.356 ..P WKT 2010 09 02 03 04 55 31.3200 -97.3300 251.000 457.0 118.780 3.860 -999.990 -999.990 1.188 ..P WKT 2010 09 02 03 14 55 31.3200 -97.3300 251.000 30.0 134.981 4.410 -999.990 -999.990 1.350 ..P WKT 2010 09 02 03 19 55 31.3200 -97.3300 251.000 122.0 141.601 3.530 -999.990 -999.990 1.416 ..P WKT 2010 09 02 03 24 55 31.3200 -97.3300 251.000 457.0 117.589 4.290 -999.990 -999.990 1.176 ..P WKT 2010 09 02 03 29 55 31.3200 -97.3300 251.000 30.0 139.870 4.130 -999.990 -999.990 1.399 ..P WKT 2010 09 02 03 34 55 31.3200 -97.3300 251.000 122.0 144.705 4.720 -999.990 -999.990 1.447 ..P WKT 2010 09 02 03 39 55 31.3200 -97.3300 251.000 457.0 118.628 4.270 -999.990 -999.990 1.186 ..P WKT 2010 09 02 03 49 55 31.3200 -97.3300 251.000 30.0 140.292 3.770 -999.990 -999.990 1.403 ..P WKT 2010 09 02 03 54 55 31.3200 -97.3300 251.000 122.0 144.343 3.830 -999.990 -999.990 1.443 ..P WKT 2010 09 02 03 59 55 31.3200 -97.3300 251.000 457.0 112.666 3.660 -999.990 -999.990 1.127 ..P WKT 2010 09 02 04 04 55 31.3200 -97.3300 251.000 30.0 147.501 3.590 -999.990 -999.990 1.475 ..P WKT 2010 09 02 04 09 55 31.3200 -97.3300 251.000 122.0 143.856 3.460 -999.990 -999.990 1.439 ..P WKT 2010 09 02 04 14 55 31.3200 -97.3300 251.000 457.0 122.757 3.980 -999.990 -999.990 1.228 ..P WKT 2010 09 02 04 24 55 31.3200 -97.3300 251.000 30.0 125.754 4.970 -999.990 -999.990 1.258 ..P WKT 2010 09 02 04 29 55 31.3200 -97.3300 251.000 122.0 126.212 3.660 -999.990 -999.990 1.262 ..P WKT 2010 09 02 04 34 55 31.3200 -97.3300 251.000 457.0 112.648 3.450 -999.990 -999.990 1.126 ..P WKT 2010 09 02 04 39 55 31.3200 -97.3300 251.000 30.0 117.231 4.380 -999.990 -999.990 1.172 ..P WKT 2010 09 02 04 44 55 31.3200 -97.3300 251.000 122.0 126.488 3.760 -999.990 -999.990 1.265 ..P WKT 2010 09 02 04 49 55 31.3200 -97.3300 251.000 457.0 106.046 4.080 -999.990 -999.990 1.060 ..P WKT 2010 09 02 05 04 55 31.3200 -97.3300 251.000 30.0 116.554 3.890 -999.990 -999.990 1.166 ..P WKT 2010 09 02 05 09 55 31.3200 -97.3300 251.000 122.0 121.029 3.900 -999.990 -999.990 1.210 ..P WKT 2010 09 02 05 14 55 31.3200 -97.3300 251.000 457.0 108.177 5.100 -999.990 -999.990 1.082 ..P WKT 2010 09 02 05 19 55 31.3200 -97.3300 251.000 30.0 107.151 4.480 -999.990 -999.990 1.072 ..P WKT 2010 09 02 05 24 55 31.3200 -97.3300 251.000 122.0 103.374 4.110 -999.990 -999.990 1.034 ..P WKT 2010 09 02 05 29 55 31.3200 -97.3300 251.000 457.0 101.797 4.610 -999.990 -999.990 1.018 ..P WKT 2010 09 02 05 39 55 31.3200 -97.3300 251.000 30.0 100.973 3.050 -999.990 -999.990 1.010 ..P WKT 2010 09 02 05 44 55 31.3200 -97.3300 251.000 122.0 108.329 4.100 -999.990 -999.990 1.083 ..P WKT 2010 09 02 05 49 55 31.3200 -97.3300 251.000 457.0 106.330 4.860 -999.990 -999.990 1.063 ..P WKT 2010 09 02 05 54 55 31.3200 -97.3300 251.000 30.0 110.109 4.300 -999.990 -999.990 1.101 ..P WKT 2010 09 02 05 59 55 31.3200 -97.3300 251.000 122.0 113.339 3.520 -999.990 -999.990 1.133 ..P WKT 2010 09 02 06 04 55 31.3200 -97.3300 251.000 457.0 110.790 3.160 -999.990 -999.990 1.108 ..P WKT 2010 09 02 06 14 55 31.3200 -97.3300 251.000 30.0 104.215 3.440 -999.990 -999.990 1.042 ..P WKT 2010 09 02 06 19 55 31.3200 -97.3300 251.000 122.0 113.678 3.710 -999.990 -999.990 1.137 ..P WKT 2010 09 02 06 24 55 31.3200 -97.3300 251.000 457.0 116.535 3.590 -999.990 -999.990 1.165 ..P WKT 2010 09 02 06 29 55 31.3200 -97.3300 251.000 30.0 108.931 4.260 -999.990 -999.990 1.089 ..P WKT 2010 09 02 06 34 55 31.3200 -97.3300 251.000 122.0 117.157 4.280 -999.990 -999.990 1.172 ..P WKT 2010 09 02 06 39 55 31.3200 -97.3300 251.000 457.0 112.031 3.230 -999.990 -999.990 1.120 ..P WKT 2010 09 02 06 49 55 31.3200 -97.3300 251.000 30.0 116.448 3.130 -999.990 -999.990 1.164 ..P WKT 2010 09 02 06 54 55 31.3200 -97.3300 251.000 122.0 121.175 4.480 -999.990 -999.990 1.212 ..P WKT 2010 09 02 06 59 55 31.3200 -97.3300 251.000 457.0 122.597 4.430 -999.990 -999.990 1.226 ..P WKT 2010 09 02 07 04 55 31.3200 -97.3300 251.000 30.0 118.925 5.030 -999.990 -999.990 1.189 ..P WKT 2010 09 02 07 09 55 31.3200 -97.3300 251.000 122.0 119.659 3.520 -999.990 -999.990 1.197 ..P WKT 2010 09 02 07 14 55 31.3200 -97.3300 251.000 457.0 118.052 3.130 -999.990 -999.990 1.181 ..P WKT 2010 09 02 07 24 55 31.3200 -97.3300 251.000 30.0 116.471 2.780 -999.990 -999.990 1.165 ..P WKT 2010 09 02 07 29 55 31.3200 -97.3300 251.000 122.0 119.252 2.930 -999.990 -999.990 1.193 ..P WKT 2010 09 02 07 34 55 31.3200 -97.3300 251.000 457.0 128.783 3.660 -999.990 -999.990 1.288 ..P WKT 2010 09 02 07 39 55 31.3200 -97.3300 251.000 30.0 109.523 3.870 -999.990 -999.990 1.095 ..P WKT 2010 09 02 07 44 55 31.3200 -97.3300 251.000 122.0 118.228 2.970 -999.990 -999.990 1.182 ..P WKT 2010 09 02 07 49 55 31.3200 -97.3300 251.000 457.0 135.200 2.950 -999.990 -999.990 1.352 ..P WKT 2010 09 02 07 59 55 31.3200 -97.3300 251.000 30.0 112.341 4.170 -999.990 -999.990 1.123 ..P WKT 2010 09 02 08 04 55 31.3200 -97.3300 251.000 122.0 120.596 3.460 -999.990 -999.990 1.206 ..P WKT 2010 09 02 08 09 55 31.3200 -97.3300 251.000 457.0 119.618 3.900 -999.990 -999.990 1.196 ..P WKT 2010 09 02 08 14 55 31.3200 -97.3300 251.000 30.0 112.714 4.590 -999.990 -999.990 1.127 ..P WKT 2010 09 02 08 19 55 31.3200 -97.3300 251.000 122.0 110.358 4.610 -999.990 -999.990 1.104 ..P WKT 2010 09 02 08 24 55 31.3200 -97.3300 251.000 457.0 108.001 4.920 -999.990 -999.990 1.080 ..P WKT 2010 09 02 08 34 55 31.3200 -97.3300 251.000 30.0 109.903 5.360 -999.990 -999.990 1.099 ..P WKT 2010 09 02 08 39 55 31.3200 -97.3300 251.000 122.0 116.643 4.490 -999.990 -999.990 1.166 ..P WKT 2010 09 02 08 44 55 31.3200 -97.3300 251.000 457.0 104.360 4.020 -999.990 -999.990 1.044 ..P WKT 2010 09 02 08 49 55 31.3200 -97.3300 251.000 30.0 105.036 4.400 -999.990 -999.990 1.050 ..P WKT 2010 09 02 08 54 55 31.3200 -97.3300 251.000 122.0 122.530 3.740 -999.990 -999.990 1.225 ..P WKT 2010 09 02 08 59 55 31.3200 -97.3300 251.000 457.0 105.283 4.620 -999.990 -999.990 1.053 ..P WKT 2010 09 02 09 09 55 31.3200 -97.3300 251.000 30.0 111.913 2.770 -999.990 -999.990 1.119 ..P WKT 2010 09 02 09 14 55 31.3200 -97.3300 251.000 122.0 112.903 2.810 -999.990 -999.990 1.129 ..P WKT 2010 09 02 09 19 55 31.3200 -97.3300 251.000 457.0 101.207 3.830 -999.990 -999.990 1.012 ..P WKT 2010 09 02 09 24 55 31.3200 -97.3300 251.000 30.0 110.748 3.910 -999.990 -999.990 1.107 ..P WKT 2010 09 02 09 29 55 31.3200 -97.3300 251.000 122.0 115.601 3.470 -999.990 -999.990 1.156 ..P WKT 2010 09 02 09 34 55 31.3200 -97.3300 251.000 457.0 97.283 3.460 -999.990 -999.990 0.973 ..P WKT 2010 09 02 09 44 55 31.3200 -97.3300 251.000 30.0 111.718 2.930 -999.990 -999.990 1.117 ..P WKT 2010 09 02 09 49 55 31.3200 -97.3300 251.000 122.0 118.818 3.850 -999.990 -999.990 1.188 ..P WKT 2010 09 02 09 54 55 31.3200 -97.3300 251.000 457.0 101.363 4.330 -999.990 -999.990 1.014 ..P WKT 2010 09 02 09 59 55 31.3200 -97.3300 251.000 30.0 115.638 4.380 -999.990 -999.990 1.156 ..P WKT 2010 09 02 10 04 55 31.3200 -97.3300 251.000 122.0 126.327 6.250 -999.990 -999.990 1.263 ..P WKT 2010 09 02 10 09 55 31.3200 -97.3300 251.000 457.0 100.866 3.390 -999.990 -999.990 1.009 ..P WKT 2010 09 02 10 19 55 31.3200 -97.3300 251.000 30.0 116.254 2.890 -999.990 -999.990 1.163 ..P WKT 2010 09 02 10 24 55 31.3200 -97.3300 251.000 122.0 123.023 3.890 -999.990 -999.990 1.230 ..P WKT 2010 09 02 10 29 55 31.3200 -97.3300 251.000 457.0 98.187 4.150 -999.990 -999.990 0.982 ..P WKT 2010 09 02 10 34 55 31.3200 -97.3300 251.000 30.0 115.444 4.450 -999.990 -999.990 1.154 ..P WKT 2010 09 02 10 39 55 31.3200 -97.3300 251.000 122.0 119.730 2.720 -999.990 -999.990 1.197 ..P WKT 2010 09 02 10 44 55 31.3200 -97.3300 251.000 457.0 91.715 2.670 -999.990 -999.990 0.917 ..P WKT 2010 09 02 10 54 55 31.3200 -97.3300 251.000 30.0 111.564 3.720 -999.990 -999.990 1.116 ..P WKT 2010 09 02 10 59 55 31.3200 -97.3300 251.000 122.0 109.322 3.390 -999.990 -999.990 1.093 ..P WKT 2010 09 02 11 04 55 31.3200 -97.3300 251.000 457.0 93.825 3.820 -999.990 -999.990 0.938 ..P WKT 2010 09 02 11 09 55 31.3200 -97.3300 251.000 30.0 106.079 4.100 -999.990 -999.990 1.061 ..P WKT 2010 09 02 11 14 55 31.3200 -97.3300 251.000 122.0 105.216 4.710 -999.990 -999.990 1.052 ..P WKT 2010 09 02 11 19 55 31.3200 -97.3300 251.000 457.0 94.136 3.950 -999.990 -999.990 0.941 ..P WKT 2010 09 02 11 29 55 31.3200 -97.3300 251.000 30.0 104.671 4.670 -999.990 -999.990 1.047 ..P WKT 2010 09 02 11 34 55 31.3200 -97.3300 251.000 122.0 107.784 4.100 -999.990 -999.990 1.078 ..P WKT 2010 09 02 11 39 55 31.3200 -97.3300 251.000 457.0 99.019 3.760 -999.990 -999.990 0.990 ..P WKT 2010 09 02 11 44 55 31.3200 -97.3300 251.000 30.0 94.812 5.130 -999.990 -999.990 0.948 ..P WKT 2010 09 02 11 49 55 31.3200 -97.3300 251.000 122.0 89.636 5.170 -999.990 -999.990 0.896 ..P WKT 2010 09 02 12 09 55 31.3200 -97.3300 251.000 457.0 99.886 2.970 -999.990 -999.990 0.999 ..P WKT 2010 09 02 12 10 25 31.3200 -97.3300 251.000 457.0 100.174 3.460 -999.990 -999.990 1.002 ..P WKT 2010 09 02 12 10 55 31.3200 -97.3300 251.000 457.0 104.467 3.040 -999.990 -999.990 1.045 ..P WKT 2010 09 02 12 11 25 31.3200 -97.3300 251.000 457.0 99.090 3.310 -999.990 -999.990 0.991 ..P WKT 2010 09 02 12 11 55 31.3200 -97.3300 251.000 457.0 102.831 3.910 -999.990 -999.990 1.028 ..P WKT 2010 09 02 12 12 25 31.3200 -97.3300 251.000 457.0 98.560 2.840 -999.990 -999.990 0.986 ..P WKT 2010 09 02 12 12 55 31.3200 -97.3300 251.000 457.0 94.013 4.960 -999.990 -999.990 0.940 ..P WKT 2010 09 02 12 13 25 31.3200 -97.3300 251.000 457.0 95.543 6.220 -999.990 -999.990 0.955 ..P WKT 2010 09 02 12 13 55 31.3200 -97.3300 251.000 457.0 97.765 4.220 -999.990 -999.990 0.978 ..P WKT 2010 09 02 12 14 25 31.3200 -97.3300 251.000 457.0 94.461 3.210 -999.990 -999.990 0.945 ..P WKT 2010 09 02 12 14 55 31.3200 -97.3300 251.000 457.0 98.616 2.840 -999.990 -999.990 0.986 ..P WKT 2010 09 02 12 19 55 31.3200 -97.3300 251.000 30.0 83.255 2.850 -999.990 -999.990 0.833 ..P WKT 2010 09 02 12 24 55 31.3200 -97.3300 251.000 122.0 84.195 3.170 -999.990 -999.990 0.842 ..P WKT 2010 09 02 12 29 55 31.3200 -97.3300 251.000 457.0 96.737 2.830 -999.990 -999.990 0.967 ..P WKT 2010 09 02 12 34 55 31.3200 -97.3300 251.000 30.0 87.731 2.660 -999.990 -999.990 0.877 ..P WKT 2010 09 02 12 39 55 31.3200 -97.3300 251.000 122.0 94.195 2.570 -999.990 -999.990 0.942 ..P WKT 2010 09 02 12 44 55 31.3200 -97.3300 251.000 457.0 102.315 2.810 -999.990 -999.990 1.023 ..P WKT 2010 09 02 12 54 55 31.3200 -97.3300 251.000 30.0 81.857 2.510 -999.990 -999.990 0.819 ..P WKT 2010 09 02 12 59 55 31.3200 -97.3300 251.000 122.0 101.059 2.800 -999.990 -999.990 1.011 ..P WKT 2010 09 02 13 04 55 31.3200 -97.3300 251.000 457.0 100.100 3.840 -999.990 -999.990 1.001 ..P WKT 2010 09 02 13 09 55 31.3200 -97.3300 251.000 30.0 100.521 3.920 -999.990 -999.990 1.005 ..P WKT 2010 09 02 13 14 55 31.3200 -97.3300 251.000 122.0 96.801 4.130 -999.990 -999.990 0.968 ..P WKT 2010 09 02 13 19 55 31.3200 -97.3300 251.000 457.0 98.326 4.580 -999.990 -999.990 0.983 ..P WKT 2010 09 02 13 29 55 31.3200 -97.3300 251.000 30.0 97.867 4.370 -999.990 -999.990 0.979 ..P WKT 2010 09 02 13 34 55 31.3200 -97.3300 251.000 122.0 99.748 4.400 -999.990 -999.990 0.997 ..P WKT 2010 09 02 13 39 55 31.3200 -97.3300 251.000 457.0 95.003 3.530 -999.990 -999.990 0.950 ..P WKT 2010 09 02 13 44 55 31.3200 -97.3300 251.000 30.0 99.092 3.400 -999.990 -999.990 0.991 ..P WKT 2010 09 02 13 49 55 31.3200 -97.3300 251.000 122.0 99.592 3.210 -999.990 -999.990 0.996 ..P WKT 2010 09 02 13 54 55 31.3200 -97.3300 251.000 457.0 100.093 2.990 -999.990 -999.990 1.001 ..P WKT 2010 09 02 14 04 55 31.3200 -97.3300 251.000 30.0 98.372 2.920 -999.990 -999.990 0.984 ..P WKT 2010 09 02 14 09 55 31.3200 -97.3300 251.000 122.0 105.536 4.100 -999.990 -999.990 1.055 ..P WKT 2010 09 02 14 14 55 31.3200 -97.3300 251.000 457.0 94.483 3.880 -999.990 -999.990 0.945 ..P WKT 2010 09 02 14 19 55 31.3200 -97.3300 251.000 30.0 96.541 3.600 -999.990 -999.990 0.965 ..P WKT 2010 09 02 14 24 55 31.3200 -97.3300 251.000 122.0 111.570 4.510 -999.990 -999.990 1.116 ..P WKT 2010 09 02 14 29 55 31.3200 -97.3300 251.000 457.0 99.137 3.280 -999.990 -999.990 0.991 ..P WKT 2010 09 02 14 39 55 31.3200 -97.3300 251.000 30.0 105.736 3.660 -999.990 -999.990 1.057 ..P WKT 2010 09 02 14 44 55 31.3200 -97.3300 251.000 122.0 103.929 3.260 -999.990 -999.990 1.039 ..P WKT 2010 09 02 14 49 55 31.3200 -97.3300 251.000 457.0 104.468 4.320 -999.990 -999.990 1.045 ..P WKT 2010 09 02 14 54 55 31.3200 -97.3300 251.000 30.0 96.040 3.510 -999.990 -999.990 0.960 ..P WKT 2010 09 02 14 59 55 31.3200 -97.3300 251.000 122.0 102.788 3.660 -999.990 -999.990 1.028 ..P WKT 2010 09 02 15 04 55 31.3200 -97.3300 251.000 457.0 95.602 3.030 -999.990 -999.990 0.956 ..P WKT 2010 09 02 15 14 55 31.3200 -97.3300 251.000 30.0 94.533 3.160 -999.990 -999.990 0.945 ..P WKT 2010 09 02 15 19 55 31.3200 -97.3300 251.000 122.0 94.579 3.320 -999.990 -999.990 0.946 ..P WKT 2010 09 02 15 24 55 31.3200 -97.3300 251.000 457.0 96.695 3.290 -999.990 -999.990 0.967 ..P WKT 2010 09 02 15 29 55 31.3200 -97.3300 251.000 30.0 87.087 3.540 -999.990 -999.990 0.871 ..P WKT 2010 09 02 15 34 55 31.3200 -97.3300 251.000 122.0 98.857 3.130 -999.990 -999.990 0.989 ..P WKT 2010 09 02 15 39 55 31.3200 -97.3300 251.000 457.0 103.869 3.140 -999.990 -999.990 1.039 ..P WKT 2010 09 02 15 49 55 31.3200 -97.3300 251.000 30.0 90.072 3.620 -999.990 -999.990 0.901 ..P WKT 2010 09 02 15 54 55 31.3200 -97.3300 251.000 122.0 100.226 3.320 -999.990 -999.990 1.002 ..P WKT 2010 09 02 15 59 55 31.3200 -97.3300 251.000 457.0 101.277 2.950 -999.990 -999.990 1.013 ..P WKT 2010 09 02 16 04 55 31.3200 -97.3300 251.000 30.0 91.297 3.630 -999.990 -999.990 0.913 ..P WKT 2010 09 02 16 09 55 31.3200 -97.3300 251.000 122.0 95.796 3.640 -999.990 -999.990 0.958 ..P WKT 2010 09 02 16 14 55 31.3200 -97.3300 251.000 457.0 94.779 3.070 -999.990 -999.990 0.948 ..P WKT 2010 09 02 16 24 55 31.3200 -97.3300 251.000 30.0 94.833 2.950 -999.990 -999.990 0.948 ..P WKT 2010 09 02 16 29 55 31.3200 -97.3300 251.000 122.0 95.490 3.630 -999.990 -999.990 0.955 ..P WKT 2010 09 02 16 34 55 31.3200 -97.3300 251.000 457.0 99.732 3.790 -999.990 -999.990 0.997 ..P WKT 2010 09 02 16 39 55 31.3200 -97.3300 251.000 30.0 86.052 3.640 -999.990 -999.990 0.861 ..P WKT 2010 09 02 16 44 55 31.3200 -97.3300 251.000 122.0 91.673 3.830 -999.990 -999.990 0.917 ..P WKT 2010 09 02 16 49 55 31.3200 -97.3300 251.000 457.0 97.293 3.830 -999.990 -999.990 0.973 ..P WKT 2010 09 02 17 04 55 31.3200 -97.3300 251.000 30.0 89.104 3.460 -999.990 -999.990 0.891 ..P WKT 2010 09 02 17 09 55 31.3200 -97.3300 251.000 122.0 96.396 3.420 -999.990 -999.990 0.964 ..P WKT 2010 09 02 17 14 55 31.3200 -97.3300 251.000 457.0 105.342 3.680 -999.990 -999.990 1.053 ..P WKT 2010 09 02 17 19 55 31.3200 -97.3300 251.000 30.0 96.923 5.210 -999.990 -999.990 0.969 ..P WKT 2010 09 02 17 24 55 31.3200 -97.3300 251.000 122.0 99.804 3.160 -999.990 -999.990 0.998 ..P WKT 2010 09 02 17 29 55 31.3200 -97.3300 251.000 457.0 102.134 3.290 -999.990 -999.990 1.021 ..P WKT 2010 09 02 17 39 55 31.3200 -97.3300 251.000 30.0 99.295 3.750 -999.990 -999.990 0.993 ..P WKT 2010 09 02 17 44 55 31.3200 -97.3300 251.000 122.0 105.147 3.350 -999.990 -999.990 1.051 ..P WKT 2010 09 02 17 49 55 31.3200 -97.3300 251.000 457.0 96.672 2.800 -999.990 -999.990 0.967 ..P WKT 2010 09 02 17 54 55 31.3200 -97.3300 251.000 30.0 98.391 3.530 -999.990 -999.990 0.984 ..P WKT 2010 09 02 17 59 55 31.3200 -97.3300 251.000 122.0 105.345 3.100 -999.990 -999.990 1.053 ..P WKT 2010 09 02 18 04 55 31.3200 -97.3300 251.000 457.0 96.319 3.320 -999.990 -999.990 0.963 ..P WKT 2010 09 02 18 14 55 31.3200 -97.3300 251.000 30.0 95.704 3.260 -999.990 -999.990 0.957 ..P WKT 2010 09 02 18 19 55 31.3200 -97.3300 251.000 122.0 99.982 3.510 -999.990 -999.990 1.000 ..P WKT 2010 09 02 18 24 55 31.3200 -97.3300 251.000 457.0 84.011 3.370 -999.990 -999.990 0.840 ..P WKT 2010 09 02 18 29 55 31.3200 -97.3300 251.000 30.0 90.080 4.310 -999.990 -999.990 0.901 ..P WKT 2010 09 02 18 34 55 31.3200 -97.3300 251.000 122.0 98.075 4.020 -999.990 -999.990 0.981 ..P WKT 2010 09 02 18 39 55 31.3200 -97.3300 251.000 457.0 73.292 4.330 -999.990 -999.990 0.733 ..P WKT 2010 09 02 18 49 55 31.3200 -97.3300 251.000 30.0 87.926 4.930 -999.990 -999.990 0.879 ..P WKT 2010 09 02 18 54 55 31.3200 -97.3300 251.000 122.0 92.773 3.540 -999.990 -999.990 0.928 ..P WKT 2010 09 02 18 59 55 31.3200 -97.3300 251.000 457.0 93.076 4.560 -999.990 -999.990 0.931 ..P WKT 2010 09 02 19 04 55 31.3200 -97.3300 251.000 30.0 90.900 4.730 -999.990 -999.990 0.909 ..P WKT 2010 09 02 19 09 55 31.3200 -97.3300 251.000 122.0 92.854 4.330 -999.990 -999.990 0.929 ..P WKT 2010 09 02 19 14 55 31.3200 -97.3300 251.000 457.0 94.672 4.550 -999.990 -999.990 0.947 ..P WKT 2010 09 02 19 24 55 31.3200 -97.3300 251.000 30.0 86.603 5.240 -999.990 -999.990 0.866 ..P WKT 2010 09 02 19 29 55 31.3200 -97.3300 251.000 122.0 95.441 4.730 -999.990 -999.990 0.954 ..P WKT 2010 09 02 19 34 55 31.3200 -97.3300 251.000 457.0 88.585 5.050 -999.990 -999.990 0.886 ..P WKT 2010 09 02 19 39 55 31.3200 -97.3300 251.000 30.0 77.875 5.060 -999.990 -999.990 0.779 ..P WKT 2010 09 02 19 44 55 31.3200 -97.3300 251.000 122.0 83.684 5.990 -999.990 -999.990 0.837 ..P WKT 2010 09 02 19 49 55 31.3200 -97.3300 251.000 457.0 89.906 5.170 -999.990 -999.990 0.899 ..P WKT 2010 09 02 19 59 55 31.3200 -97.3300 251.000 30.0 76.275 5.330 -999.990 -999.990 0.763 ..P WKT 2010 09 02 20 04 55 31.3200 -97.3300 251.000 122.0 93.448 4.720 -999.990 -999.990 0.934 ..P WKT 2010 09 02 20 09 55 31.3200 -97.3300 251.000 457.0 99.747 7.280 -999.990 -999.990 0.997 ..P WKT 2010 09 02 20 14 55 31.3200 -97.3300 251.000 30.0 94.486 9.240 -999.990 -999.990 0.945 ..P WKT 2010 09 02 20 19 55 31.3200 -97.3300 251.000 122.0 96.105 8.000 -999.990 -999.990 0.961 ..P WKT 2010 09 02 20 24 55 31.3200 -97.3300 251.000 457.0 96.899 5.250 -999.990 -999.990 0.969 ..P WKT 2010 09 02 20 34 55 31.3200 -97.3300 251.000 30.0 93.316 5.980 -999.990 -999.990 0.933 ..P WKT 2010 09 02 20 39 55 31.3200 -97.3300 251.000 122.0 106.552 7.910 -999.990 -999.990 1.066 ..P WKT 2010 09 02 20 44 55 31.3200 -97.3300 251.000 457.0 107.129 9.130 -999.990 -999.990 1.071 ..P WKT 2010 09 02 20 49 55 31.3200 -97.3300 251.000 30.0 105.505 11.090 -999.990 -999.990 1.055 ..P WKT 2010 09 02 20 54 55 31.3200 -97.3300 251.000 122.0 108.008 9.390 -999.990 -999.990 1.080 ..P WKT 2010 09 02 20 59 55 31.3200 -97.3300 251.000 457.0 111.336 6.340 -999.990 -999.990 1.113 ..P WKT 2010 09 02 21 09 55 31.3200 -97.3300 251.000 30.0 102.860 6.520 -999.990 -999.990 1.029 ..P WKT 2010 09 02 21 14 55 31.3200 -97.3300 251.000 122.0 104.263 9.380 -999.990 -999.990 1.043 ..P WKT 2010 09 02 21 19 55 31.3200 -97.3300 251.000 457.0 109.791 11.110 -999.990 -999.990 1.098 ..P WKT 2010 09 02 21 24 55 31.3200 -97.3300 251.000 30.0 106.517 8.810 -999.990 -999.990 1.065 ..P WKT 2010 09 02 21 29 55 31.3200 -97.3300 251.000 122.0 108.744 4.680 -999.990 -999.990 1.087 ..P WKT 2010 09 02 21 34 55 31.3200 -97.3300 251.000 457.0 106.295 3.570 -999.990 -999.990 1.063 ..P WKT 2010 09 02 21 44 55 31.3200 -97.3300 251.000 30.0 96.977 3.460 -999.990 -999.990 0.970 ..P WKT 2010 09 02 21 49 55 31.3200 -97.3300 251.000 122.0 104.961 3.660 -999.990 -999.990 1.050 ..P WKT 2010 09 02 21 54 55 31.3200 -97.3300 251.000 457.0 107.167 4.150 -999.990 -999.990 1.072 ..P WKT 2010 09 02 21 59 55 31.3200 -97.3300 251.000 30.0 101.399 4.700 -999.990 -999.990 1.014 ..P WKT 2010 09 02 22 04 55 31.3200 -97.3300 251.000 122.0 111.032 4.330 -999.990 -999.990 1.110 ..P WKT 2010 09 02 22 09 55 31.3200 -97.3300 251.000 457.0 105.814 4.760 -999.990 -999.990 1.058 ..P WKT 2010 09 02 22 19 55 31.3200 -97.3300 251.000 30.0 124.821 4.170 -999.990 -999.990 1.248 ..P WKT 2010 09 02 22 24 55 31.3200 -97.3300 251.000 122.0 124.572 4.390 -999.990 -999.990 1.246 ..P WKT 2010 09 02 22 29 55 31.3200 -97.3300 251.000 457.0 114.424 7.730 -999.990 -999.990 1.144 ..P WKT 2010 09 02 22 34 55 31.3200 -97.3300 251.000 30.0 127.785 4.570 -999.990 -999.990 1.278 ..P WKT 2010 09 02 22 39 55 31.3200 -97.3300 251.000 122.0 129.736 4.160 -999.990 -999.990 1.297 ..P WKT 2010 09 02 22 44 55 31.3200 -97.3300 251.000 457.0 116.015 4.010 -999.990 -999.990 1.160 ..P WKT 2010 09 02 22 54 55 31.3200 -97.3300 251.000 30.0 117.403 4.400 -999.990 -999.990 1.174 ..P WKT 2010 09 02 22 59 55 31.3200 -97.3300 251.000 122.0 119.177 4.050 -999.990 -999.990 1.192 ..P WKT 2010 09 02 23 04 55 31.3200 -97.3300 251.000 457.0 112.291 5.810 -999.990 -999.990 1.123 ..P WKT 2010 09 02 23 09 55 31.3200 -97.3300 251.000 30.0 101.833 6.490 -999.990 -999.990 1.018 ..P WKT 2010 09 02 23 14 55 31.3200 -97.3300 251.000 122.0 109.104 5.730 -999.990 -999.990 1.091 ..P WKT 2010 09 02 23 19 55 31.3200 -97.3300 251.000 457.0 105.930 4.570 -999.990 -999.990 1.059 ..P WKT 2010 09 02 23 29 55 31.3200 -97.3300 251.000 30.0 114.477 4.160 -999.990 -999.990 1.145 ..P WKT 2010 09 02 23 34 55 31.3200 -97.3300 251.000 122.0 114.240 5.650 -999.990 -999.990 1.142 ..P WKT 2010 09 02 23 39 55 31.3200 -97.3300 251.000 457.0 98.478 6.270 -999.990 -999.990 0.985 ..P WKT 2010 09 02 23 44 55 31.3200 -97.3300 251.000 30.0 102.363 6.610 -999.990 -999.990 1.024 ..P WKT 2010 09 02 23 49 55 31.3200 -97.3300 251.000 122.0 108.860 4.940 -999.990 -999.990 1.089 ..P WKT 2010 09 03 00 09 55 31.3200 -97.3300 251.000 457.0 108.788 3.860 -999.990 -999.990 1.088 ..P WKT 2010 09 03 00 10 25 31.3200 -97.3300 251.000 457.0 109.330 3.680 -999.990 -999.990 1.093 ..P WKT 2010 09 03 00 10 55 31.3200 -97.3300 251.000 457.0 106.575 4.080 -999.990 -999.990 1.066 ..P WKT 2010 09 03 00 11 25 31.3200 -97.3300 251.000 457.0 101.346 6.950 -999.990 -999.990 1.013 ..P WKT 2010 09 03 00 11 55 31.3200 -97.3300 251.000 457.0 101.339 5.240 -999.990 -999.990 1.013 ..P WKT 2010 09 03 00 12 25 31.3200 -97.3300 251.000 457.0 103.530 3.670 -999.990 -999.990 1.035 ..P WKT 2010 09 03 00 12 55 31.3200 -97.3300 251.000 457.0 105.721 4.100 -999.990 -999.990 1.057 ..P WKT 2010 09 03 00 13 25 31.3200 -97.3300 251.000 457.0 99.393 3.630 -999.990 -999.990 0.994 ..P WKT 2010 09 03 00 13 55 31.3200 -97.3300 251.000 457.0 103.508 3.530 -999.990 -999.990 1.035 ..P WKT 2010 09 03 00 14 25 31.3200 -97.3300 251.000 457.0 107.073 3.560 -999.990 -999.990 1.071 ..P WKT 2010 09 03 00 14 55 31.3200 -97.3300 251.000 457.0 105.692 4.510 -999.990 -999.990 1.057 ..P WKT 2010 09 03 00 19 55 31.3200 -97.3300 251.000 30.0 104.244 4.250 -999.990 -999.990 1.042 ..P WKT 2010 09 03 00 24 55 31.3200 -97.3300 251.000 122.0 103.620 5.130 -999.990 -999.990 1.036 ..P WKT 2010 09 03 00 29 55 31.3200 -97.3300 251.000 457.0 108.769 6.300 -999.990 -999.990 1.088 ..P WKT 2010 09 03 00 34 55 31.3200 -97.3300 251.000 30.0 94.951 5.450 -999.990 -999.990 0.950 ..P WKT 2010 09 03 00 39 55 31.3200 -97.3300 251.000 122.0 107.523 4.740 -999.990 -999.990 1.075 ..P WKT 2010 09 03 00 44 55 31.3200 -97.3300 251.000 457.0 97.276 3.930 -999.990 -999.990 0.973 ..P WKT 2010 09 03 00 54 55 31.3200 -97.3300 251.000 30.0 109.304 3.950 -999.990 -999.990 1.093 ..P WKT 2010 09 03 00 59 55 31.3200 -97.3300 251.000 122.0 112.057 5.540 -999.990 -999.990 1.121 ..P WKT 2010 09 03 01 04 55 31.3200 -97.3300 251.000 457.0 94.183 5.820 -999.990 -999.990 0.942 ..P WKT 2010 09 03 01 09 55 31.3200 -97.3300 251.000 30.0 115.914 5.790 -999.990 -999.990 1.159 ..P WKT 2010 09 03 01 14 55 31.3200 -97.3300 251.000 122.0 114.267 3.670 -999.990 -999.990 1.143 ..P WKT 2010 09 03 01 19 55 31.3200 -97.3300 251.000 457.0 101.890 5.020 -999.990 -999.990 1.019 ..P WKT 2010 09 03 01 29 55 31.3200 -97.3300 251.000 30.0 109.875 3.930 -999.990 -999.990 1.099 ..P WKT 2010 09 03 01 34 55 31.3200 -97.3300 251.000 122.0 112.354 4.470 -999.990 -999.990 1.124 ..P WKT 2010 09 03 01 39 55 31.3200 -97.3300 251.000 457.0 108.230 3.950 -999.990 -999.990 1.082 ..P WKT 2010 09 03 01 44 55 31.3200 -97.3300 251.000 30.0 115.663 3.700 -999.990 -999.990 1.157 ..P WKT 2010 09 03 01 49 55 31.3200 -97.3300 251.000 122.0 102.180 4.400 -999.990 -999.990 1.022 ..P WKT 2010 09 03 01 54 55 31.3200 -97.3300 251.000 457.0 105.210 3.800 -999.990 -999.990 1.052 ..P WKT 2010 09 03 02 04 55 31.3200 -97.3300 251.000 30.0 95.502 4.210 -999.990 -999.990 0.955 ..P WKT 2010 09 03 02 09 55 31.3200 -97.3300 251.000 122.0 103.271 4.300 -999.990 -999.990 1.033 ..P WKT 2010 09 03 02 14 55 31.3200 -97.3300 251.000 457.0 112.281 4.100 -999.990 -999.990 1.123 ..P WKT 2010 09 03 02 19 55 31.3200 -97.3300 251.000 30.0 108.765 5.100 -999.990 -999.990 1.088 ..P WKT 2010 09 03 02 24 55 31.3200 -97.3300 251.000 122.0 98.086 4.930 -999.990 -999.990 0.981 ..P WKT 2010 09 03 02 29 55 31.3200 -97.3300 251.000 457.0 117.976 4.630 -999.990 -999.990 1.180 ..P WKT 2010 09 03 02 39 55 31.3200 -97.3300 251.000 30.0 100.061 4.430 -999.990 -999.990 1.001 ..P WKT 2010 09 03 02 44 55 31.3200 -97.3300 251.000 122.0 104.392 4.150 -999.990 -999.990 1.044 ..P WKT 2010 09 03 02 49 55 31.3200 -97.3300 251.000 457.0 138.888 5.190 -999.990 -999.990 1.389 ..P WKT 2010 09 03 02 54 55 31.3200 -97.3300 251.000 30.0 106.580 4.260 -999.990 -999.990 1.066 ..P WKT 2010 09 03 02 59 55 31.3200 -97.3300 251.000 122.0 112.153 4.350 -999.990 -999.990 1.122 ..P WKT 2010 09 03 03 04 55 31.3200 -97.3300 251.000 457.0 126.681 3.980 -999.990 -999.990 1.267 ..P WKT 2010 09 03 03 14 55 31.3200 -97.3300 251.000 30.0 109.268 3.890 -999.990 -999.990 1.093 ..P WKT 2010 09 03 03 19 55 31.3200 -97.3300 251.000 122.0 115.492 3.940 -999.990 -999.990 1.155 ..P WKT 2010 09 03 03 24 55 31.3200 -97.3300 251.000 457.0 132.466 5.010 -999.990 -999.990 1.325 ..P WKT 2010 09 03 03 29 55 31.3200 -97.3300 251.000 30.0 103.135 5.130 -999.990 -999.990 1.031 ..P WKT 2010 09 03 03 34 55 31.3200 -97.3300 251.000 122.0 122.730 3.740 -999.990 -999.990 1.227 ..P WKT 2010 09 03 03 39 55 31.3200 -97.3300 251.000 457.0 128.818 3.980 -999.990 -999.990 1.288 ..P WKT 2010 09 03 03 49 55 31.3200 -97.3300 251.000 30.0 115.336 3.990 -999.990 -999.990 1.153 ..P WKT 2010 09 03 03 54 55 31.3200 -97.3300 251.000 122.0 116.856 4.030 -999.990 -999.990 1.169 ..P WKT 2010 09 03 03 59 55 31.3200 -97.3300 251.000 457.0 136.716 5.060 -999.990 -999.990 1.367 ..P WKT 2010 09 03 04 04 55 31.3200 -97.3300 251.000 30.0 107.624 4.380 -999.990 -999.990 1.076 ..P WKT 2010 09 03 04 09 55 31.3200 -97.3300 251.000 122.0 119.350 4.600 -999.990 -999.990 1.194 ..P WKT 2010 09 03 04 14 55 31.3200 -97.3300 251.000 457.0 142.662 4.520 -999.990 -999.990 1.427 ..P WKT 2010 09 03 04 24 55 31.3200 -97.3300 251.000 30.0 117.942 5.280 -999.990 -999.990 1.179 ..P WKT 2010 09 03 04 29 55 31.3200 -97.3300 251.000 122.0 135.012 4.580 -999.990 -999.990 1.350 ..P WKT 2010 09 03 04 34 55 31.3200 -97.3300 251.000 457.0 137.461 4.610 -999.990 -999.990 1.375 ..P WKT 2010 09 03 04 39 55 31.3200 -97.3300 251.000 30.0 110.660 4.570 -999.990 -999.990 1.107 ..P WKT 2010 09 03 04 44 55 31.3200 -97.3300 251.000 122.0 130.769 4.790 -999.990 -999.990 1.308 ..P WKT 2010 09 03 04 49 55 31.3200 -97.3300 251.000 457.0 131.562 4.680 -999.990 -999.990 1.316 ..P WKT 2010 09 03 05 04 55 31.3200 -97.3300 251.000 30.0 117.389 6.100 -999.990 -999.990 1.174 ..P WKT 2010 09 03 05 09 55 31.3200 -97.3300 251.000 122.0 132.404 4.210 -999.990 -999.990 1.324 ..P WKT 2010 09 03 05 14 55 31.3200 -97.3300 251.000 457.0 137.482 4.570 -999.990 -999.990 1.375 ..P WKT 2010 09 03 05 19 55 31.3200 -97.3300 251.000 30.0 121.853 6.270 -999.990 -999.990 1.219 ..P WKT 2010 09 03 05 24 55 31.3200 -97.3300 251.000 122.0 129.968 4.000 -999.990 -999.990 1.300 ..P WKT 2010 09 03 05 29 55 31.3200 -97.3300 251.000 457.0 139.190 4.130 -999.990 -999.990 1.392 ..P WKT 2010 09 03 05 39 55 31.3200 -97.3300 251.000 30.0 121.982 4.100 -999.990 -999.990 1.220 ..P WKT 2010 09 03 05 44 55 31.3200 -97.3300 251.000 122.0 132.009 4.270 -999.990 -999.990 1.320 ..P WKT 2010 09 03 05 49 55 31.3200 -97.3300 251.000 457.0 122.700 4.640 -999.990 -999.990 1.227 ..P WKT 2010 09 03 05 54 55 31.3200 -97.3300 251.000 30.0 116.706 4.510 -999.990 -999.990 1.167 ..P WKT 2010 09 03 05 59 55 31.3200 -97.3300 251.000 122.0 127.011 4.390 -999.990 -999.990 1.270 ..P WKT 2010 09 03 06 04 55 31.3200 -97.3300 251.000 457.0 118.390 4.910 -999.990 -999.990 1.184 ..P WKT 2010 09 03 06 14 55 31.3200 -97.3300 251.000 30.0 116.206 4.580 -999.990 -999.990 1.162 ..P WKT 2010 09 03 06 19 55 31.3200 -97.3300 251.000 122.0 126.515 4.860 -999.990 -999.990 1.265 ..P WKT 2010 09 03 06 24 55 31.3200 -97.3300 251.000 457.0 125.907 5.140 -999.990 -999.990 1.259 ..P WKT 2010 09 03 06 29 55 31.3200 -97.3300 251.000 30.0 114.795 4.640 -999.990 -999.990 1.148 ..P WKT 2010 09 03 06 34 55 31.3200 -97.3300 251.000 122.0 121.098 4.810 -999.990 -999.990 1.211 ..P WKT 2010 09 03 06 39 55 31.3200 -97.3300 251.000 457.0 127.954 5.490 -999.990 -999.990 1.280 ..P WKT 2010 09 03 06 49 55 31.3200 -97.3300 251.000 30.0 111.254 4.980 -999.990 -999.990 1.113 ..P WKT 2010 09 03 06 54 55 31.3200 -97.3300 251.000 122.0 125.715 4.780 -999.990 -999.990 1.257 ..P WKT 2010 09 03 06 59 55 31.3200 -97.3300 251.000 457.0 106.994 4.900 -999.990 -999.990 1.070 ..P WKT 2010 09 03 07 04 55 31.3200 -97.3300 251.000 30.0 112.054 4.700 -999.990 -999.990 1.121 ..P WKT 2010 09 03 07 09 55 31.3200 -97.3300 251.000 122.0 121.125 4.930 -999.990 -999.990 1.211 ..P WKT 2010 09 03 07 14 55 31.3200 -97.3300 251.000 457.0 109.591 6.820 -999.990 -999.990 1.096 ..P WKT 2010 09 03 07 24 55 31.3200 -97.3300 251.000 30.0 114.537 4.890 -999.990 -999.990 1.145 ..P WKT 2010 09 03 07 29 55 31.3200 -97.3300 251.000 122.0 118.295 5.120 -999.990 -999.990 1.183 ..P WKT 2010 09 03 07 34 55 31.3200 -97.3300 251.000 457.0 124.821 5.270 -999.990 -999.990 1.248 ..P WKT 2010 09 03 07 39 55 31.3200 -97.3300 251.000 30.0 111.424 4.850 -999.990 -999.990 1.114 ..P WKT 2010 09 03 07 44 55 31.3200 -97.3300 251.000 122.0 117.397 5.140 -999.990 -999.990 1.174 ..P WKT 2010 09 03 07 49 55 31.3200 -97.3300 251.000 457.0 125.446 6.270 -999.990 -999.990 1.254 ..P WKT 2010 09 03 07 59 55 31.3200 -97.3300 251.000 30.0 114.778 4.970 -999.990 -999.990 1.148 ..P WKT 2010 09 03 08 04 55 31.3200 -97.3300 251.000 122.0 128.306 4.940 -999.990 -999.990 1.283 ..P WKT 2010 09 03 08 09 55 31.3200 -97.3300 251.000 457.0 129.655 4.790 -999.990 -999.990 1.297 ..P WKT 2010 09 03 08 14 55 31.3200 -97.3300 251.000 30.0 127.128 4.590 -999.990 -999.990 1.271 ..P WKT 2010 09 03 08 19 55 31.3200 -97.3300 251.000 122.0 127.647 4.700 -999.990 -999.990 1.276 ..P WKT 2010 09 03 08 24 55 31.3200 -97.3300 251.000 457.0 128.442 4.310 -999.990 -999.990 1.284 ..P WKT 2010 09 03 08 34 55 31.3200 -97.3300 251.000 30.0 134.544 4.450 -999.990 -999.990 1.345 ..P WKT 2010 09 03 08 39 55 31.3200 -97.3300 251.000 122.0 121.294 4.900 -999.990 -999.990 1.213 ..P WKT 2010 09 03 08 44 55 31.3200 -97.3300 251.000 457.0 128.816 5.640 -999.990 -999.990 1.288 ..P WKT 2010 09 03 08 49 55 31.3200 -97.3300 251.000 30.0 128.029 5.400 -999.990 -999.990 1.280 ..P WKT 2010 09 03 08 54 55 31.3200 -97.3300 251.000 122.0 128.073 7.070 -999.990 -999.990 1.281 ..P WKT 2010 09 03 08 59 55 31.3200 -97.3300 251.000 457.0 119.806 6.000 -999.990 -999.990 1.198 ..P WKT 2010 09 03 09 09 55 31.3200 -97.3300 251.000 30.0 125.474 6.970 -999.990 -999.990 1.255 ..P WKT 2010 09 03 09 14 55 31.3200 -97.3300 251.000 122.0 130.268 7.580 -999.990 -999.990 1.303 ..P WKT 2010 09 03 09 19 55 31.3200 -97.3300 251.000 457.0 130.075 5.840 -999.990 -999.990 1.301 ..P WKT 2010 09 03 09 24 55 31.3200 -97.3300 251.000 30.0 139.028 5.730 -999.990 -999.990 1.390 ..P WKT 2010 09 03 09 29 55 31.3200 -97.3300 251.000 122.0 128.857 5.570 -999.990 -999.990 1.289 ..P WKT 2010 09 03 09 34 55 31.3200 -97.3300 251.000 457.0 128.941 6.000 -999.990 -999.990 1.289 ..P WKT 2010 09 03 09 44 55 31.3200 -97.3300 251.000 30.0 129.604 6.460 -999.990 -999.990 1.296 ..P WKT 2010 09 03 09 49 55 31.3200 -97.3300 251.000 122.0 151.809 4.970 -999.990 -999.990 1.518 ..P WKT 2010 09 03 09 54 55 31.3200 -97.3300 251.000 457.0 125.909 4.920 -999.990 -999.990 1.259 ..P WKT 2010 09 03 09 59 55 31.3200 -97.3300 251.000 30.0 129.815 5.480 -999.990 -999.990 1.298 ..P WKT 2010 09 03 10 04 55 31.3200 -97.3300 251.000 122.0 148.005 4.990 -999.990 -999.990 1.480 ..P WKT 2010 09 03 10 09 55 31.3200 -97.3300 251.000 457.0 127.645 4.230 -999.990 -999.990 1.276 ..P WKT 2010 09 03 10 19 55 31.3200 -97.3300 251.000 30.0 131.478 4.410 -999.990 -999.990 1.315 ..P WKT 2010 09 03 10 24 55 31.3200 -97.3300 251.000 122.0 131.404 4.810 -999.990 -999.990 1.314 ..P WKT 2010 09 03 10 29 55 31.3200 -97.3300 251.000 457.0 123.977 4.730 -999.990 -999.990 1.240 ..P WKT 2010 09 03 10 34 55 31.3200 -97.3300 251.000 30.0 139.994 5.000 -999.990 -999.990 1.400 ..P WKT 2010 09 03 10 39 55 31.3200 -97.3300 251.000 122.0 140.337 6.060 -999.990 -999.990 1.403 ..P WKT 2010 09 03 10 44 55 31.3200 -97.3300 251.000 457.0 132.632 4.680 -999.990 -999.990 1.326 ..P WKT 2010 09 03 10 54 55 31.3200 -97.3300 251.000 30.0 131.511 5.310 -999.990 -999.990 1.315 ..P WKT 2010 09 03 10 59 55 31.3200 -97.3300 251.000 122.0 153.503 4.580 -999.990 -999.990 1.535 ..P WKT 2010 09 03 11 04 55 31.3200 -97.3300 251.000 457.0 123.589 5.150 -999.990 -999.990 1.236 ..P WKT 2010 09 03 11 09 55 31.3200 -97.3300 251.000 30.0 128.094 6.880 -999.990 -999.990 1.281 ..P WKT 2010 09 03 11 14 55 31.3200 -97.3300 251.000 122.0 135.794 4.720 -999.990 -999.990 1.358 ..P WKT 2010 09 03 11 19 55 31.3200 -97.3300 251.000 457.0 119.477 5.640 -999.990 -999.990 1.195 ..P WKT 2010 09 03 11 29 55 31.3200 -97.3300 251.000 30.0 125.358 4.590 -999.990 -999.990 1.254 ..P WKT 2010 09 03 11 34 55 31.3200 -97.3300 251.000 122.0 128.955 4.630 -999.990 -999.990 1.290 ..P WKT 2010 09 03 11 39 55 31.3200 -97.3300 251.000 457.0 120.611 5.190 -999.990 -999.990 1.206 ..P WKT 2010 09 03 11 44 55 31.3200 -97.3300 251.000 30.0 133.096 5.860 -999.990 -999.990 1.331 ..P WKT 2010 09 03 11 49 55 31.3200 -97.3300 251.000 122.0 127.806 5.260 -999.990 -999.990 1.278 ..P WKT 2010 09 03 12 09 55 31.3200 -97.3300 251.000 457.0 141.464 4.400 -999.990 -999.990 1.415 ..P WKT 2010 09 03 12 10 25 31.3200 -97.3300 251.000 457.0 136.719 5.090 -999.990 -999.990 1.367 ..P WKT 2010 09 03 12 10 55 31.3200 -97.3300 251.000 457.0 134.198 4.690 -999.990 -999.990 1.342 ..P WKT 2010 09 03 12 11 25 31.3200 -97.3300 251.000 457.0 137.512 4.540 -999.990 -999.990 1.375 ..P WKT 2010 09 03 12 11 55 31.3200 -97.3300 251.000 457.0 132.767 4.430 -999.990 -999.990 1.328 ..P WKT 2010 09 03 12 12 25 31.3200 -97.3300 251.000 457.0 130.245 4.770 -999.990 -999.990 1.302 ..P WKT 2010 09 03 12 12 55 31.3200 -97.3300 251.000 457.0 133.560 4.570 -999.990 -999.990 1.336 ..P WKT 2010 09 03 12 13 25 31.3200 -97.3300 251.000 457.0 134.095 4.700 -999.990 -999.990 1.341 ..P WKT 2010 09 03 12 13 55 31.3200 -97.3300 251.000 457.0 133.241 4.740 -999.990 -999.990 1.332 ..P WKT 2010 09 03 12 14 25 31.3200 -97.3300 251.000 457.0 131.831 4.700 -999.990 -999.990 1.318 ..P WKT 2010 09 03 12 14 55 31.3200 -97.3300 251.000 457.0 129.865 5.000 -999.990 -999.990 1.299 ..P WKT 2010 09 03 12 19 55 31.3200 -97.3300 251.000 30.0 133.550 5.160 -999.990 -999.990 1.336 ..P WKT 2010 09 03 12 24 55 31.3200 -97.3300 251.000 122.0 138.626 5.330 -999.990 -999.990 1.386 ..P WKT 2010 09 03 12 29 55 31.3200 -97.3300 251.000 457.0 126.189 5.820 -999.990 -999.990 1.262 ..P WKT 2010 09 03 12 34 55 31.3200 -97.3300 251.000 30.0 134.323 4.500 -999.990 -999.990 1.343 ..P WKT 2010 09 03 12 39 55 31.3200 -97.3300 251.000 122.0 140.791 4.700 -999.990 -999.990 1.408 ..P WKT 2010 09 03 12 44 55 31.3200 -97.3300 251.000 457.0 120.844 4.320 -999.990 -999.990 1.208 ..P WKT 2010 09 03 12 54 55 31.3200 -97.3300 251.000 30.0 135.546 4.190 -999.990 -999.990 1.355 ..P WKT 2010 09 03 12 59 55 31.3200 -97.3300 251.000 122.0 130.709 4.360 -999.990 -999.990 1.307 ..P WKT 2010 09 03 13 04 55 31.3200 -97.3300 251.000 457.0 129.487 5.540 -999.990 -999.990 1.295 ..P WKT 2010 09 03 13 09 55 31.3200 -97.3300 251.000 30.0 124.649 6.420 -999.990 -999.990 1.246 ..P WKT 2010 09 03 13 14 55 31.3200 -97.3300 251.000 122.0 129.270 5.820 -999.990 -999.990 1.293 ..P WKT 2010 09 03 13 19 55 31.3200 -97.3300 251.000 457.0 129.439 6.010 -999.990 -999.990 1.294 ..P WKT 2010 09 03 13 29 55 31.3200 -97.3300 251.000 30.0 116.417 6.190 -999.990 -999.990 1.164 ..P WKT 2010 09 03 13 34 55 31.3200 -97.3300 251.000 122.0 122.987 5.780 -999.990 -999.990 1.230 ..P WKT 2010 09 03 13 39 55 31.3200 -97.3300 251.000 457.0 115.640 6.700 -999.990 -999.990 1.156 ..P WKT 2010 09 03 13 44 55 31.3200 -97.3300 251.000 30.0 111.910 8.070 -999.990 -999.990 1.119 ..P WKT 2010 09 03 13 49 55 31.3200 -97.3300 251.000 122.0 112.078 7.350 -999.990 -999.990 1.121 ..P WKT 2010 09 03 13 54 55 31.3200 -97.3300 251.000 457.0 105.701 5.520 -999.990 -999.990 1.057 ..P WKT 2010 09 03 14 04 55 31.3200 -97.3300 251.000 30.0 118.807 5.550 -999.990 -999.990 1.188 ..P WKT 2010 09 03 14 09 55 31.3200 -97.3300 251.000 122.0 118.519 7.240 -999.990 -999.990 1.185 ..P WKT 2010 09 03 14 14 55 31.3200 -97.3300 251.000 457.0 110.290 8.230 -999.990 -999.990 1.103 ..P WKT 2010 09 03 14 19 55 31.3200 -97.3300 251.000 30.0 117.104 6.650 -999.990 -999.990 1.171 ..P WKT 2010 09 03 14 24 55 31.3200 -97.3300 251.000 122.0 120.437 5.710 -999.990 -999.990 1.204 ..P WKT 2010 09 03 14 29 55 31.3200 -97.3300 251.000 457.0 122.517 6.310 -999.990 -999.990 1.225 ..P WKT 2010 09 03 14 39 55 31.3200 -97.3300 251.000 30.0 124.606 5.420 -999.990 -999.990 1.246 ..P WKT 2010 09 03 14 44 55 31.3200 -97.3300 251.000 122.0 131.027 5.580 -999.990 -999.990 1.310 ..P WKT 2010 09 03 14 49 55 31.3200 -97.3300 251.000 457.0 125.183 6.210 -999.990 -999.990 1.252 ..P WKT 2010 09 03 14 54 55 31.3200 -97.3300 251.000 30.0 115.296 5.590 -999.990 -999.990 1.153 ..P WKT 2010 09 03 14 59 55 31.3200 -97.3300 251.000 122.0 120.044 4.760 -999.990 -999.990 1.200 ..P WKT 2010 09 03 15 04 55 31.3200 -97.3300 251.000 457.0 113.919 4.460 -999.990 -999.990 1.139 ..P WKT 2010 09 03 15 14 55 31.3200 -97.3300 251.000 30.0 114.335 5.410 -999.990 -999.990 1.143 ..P WKT 2010 09 03 15 19 55 31.3200 -97.3300 251.000 122.0 122.553 5.010 -999.990 -999.990 1.226 ..P WKT 2010 09 03 15 24 55 31.3200 -97.3300 251.000 457.0 117.800 4.600 -999.990 -999.990 1.178 ..P WKT 2010 09 03 15 29 55 31.3200 -97.3300 251.000 30.0 114.860 4.580 -999.990 -999.990 1.149 ..P WKT 2010 09 03 15 34 55 31.3200 -97.3300 251.000 122.0 121.545 4.800 -999.990 -999.990 1.215 ..P WKT 2010 09 03 15 39 55 31.3200 -97.3300 251.000 457.0 117.768 4.650 -999.990 -999.990 1.178 ..P WKT 2010 09 03 15 49 55 31.3200 -97.3300 251.000 30.0 119.381 5.080 -999.990 -999.990 1.194 ..P WKT 2010 09 03 15 54 55 31.3200 -97.3300 251.000 122.0 126.727 4.480 -999.990 -999.990 1.267 ..P WKT 2010 09 03 15 59 55 31.3200 -97.3300 251.000 457.0 117.326 4.540 -999.990 -999.990 1.173 ..P WKT 2010 09 03 16 04 55 31.3200 -97.3300 251.000 30.0 121.323 5.250 -999.990 -999.990 1.213 ..P WKT 2010 09 03 16 09 55 31.3200 -97.3300 251.000 122.0 122.251 5.080 -999.990 -999.990 1.223 ..P WKT 2010 09 03 16 14 55 31.3200 -97.3300 251.000 457.0 121.781 4.610 -999.990 -999.990 1.218 ..P WKT 2010 09 03 16 24 55 31.3200 -97.3300 251.000 30.0 119.406 5.040 -999.990 -999.990 1.194 ..P WKT 2010 09 03 16 29 55 31.3200 -97.3300 251.000 122.0 126.439 4.770 -999.990 -999.990 1.264 ..P WKT 2010 09 03 16 34 55 31.3200 -97.3300 251.000 457.0 122.019 5.290 -999.990 -999.990 1.220 ..P WKT 2010 09 03 16 39 55 31.3200 -97.3300 251.000 30.0 126.260 6.330 -999.990 -999.990 1.263 ..P WKT 2010 09 03 16 44 55 31.3200 -97.3300 251.000 122.0 125.750 5.900 -999.990 -999.990 1.258 ..P WKT 2010 09 03 16 49 55 31.3200 -97.3300 251.000 457.0 119.094 4.900 -999.990 -999.990 1.191 ..P WKT 2010 09 03 17 04 55 31.3200 -97.3300 251.000 30.0 123.914 6.240 -999.990 -999.990 1.239 ..P WKT 2010 09 03 17 09 55 31.3200 -97.3300 251.000 122.0 131.053 5.920 -999.990 -999.990 1.311 ..P WKT 2010 09 03 17 14 55 31.3200 -97.3300 251.000 457.0 129.805 6.340 -999.990 -999.990 1.298 ..P WKT 2010 09 03 17 19 55 31.3200 -97.3300 251.000 30.0 131.913 5.490 -999.990 -999.990 1.319 ..P WKT 2010 09 03 17 24 55 31.3200 -97.3300 251.000 122.0 143.249 4.990 -999.990 -999.990 1.432 ..P WKT 2010 09 03 17 29 55 31.3200 -97.3300 251.000 457.0 134.171 4.810 -999.990 -999.990 1.342 ..P WKT 2010 09 03 17 39 55 31.3200 -97.3300 251.000 30.0 138.249 5.030 -999.990 -999.990 1.382 ..P WKT 2010 09 03 17 44 55 31.3200 -97.3300 251.000 122.0 139.799 6.030 -999.990 -999.990 1.398 ..P WKT 2010 09 03 17 49 55 31.3200 -97.3300 251.000 457.0 130.297 5.520 -999.990 -999.990 1.303 ..P WKT 2010 09 03 17 54 55 31.3200 -97.3300 251.000 30.0 134.505 5.040 -999.990 -999.990 1.345 ..P WKT 2010 09 03 17 59 55 31.3200 -97.3300 251.000 122.0 135.775 5.090 -999.990 -999.990 1.358 ..P WKT 2010 09 03 18 04 55 31.3200 -97.3300 251.000 457.0 135.366 4.860 -999.990 -999.990 1.354 ..P WKT 2010 09 03 18 14 55 31.3200 -97.3300 251.000 30.0 127.950 5.520 -999.990 -999.990 1.280 ..P WKT 2010 09 03 18 19 55 31.3200 -97.3300 251.000 122.0 133.819 5.150 -999.990 -999.990 1.338 ..P WKT 2010 09 03 18 24 55 31.3200 -97.3300 251.000 457.0 132.130 4.990 -999.990 -999.990 1.321 ..P WKT 2010 09 03 18 29 55 31.3200 -97.3300 251.000 30.0 128.060 4.700 -999.990 -999.990 1.281 ..P WKT 2010 09 03 18 34 55 31.3200 -97.3300 251.000 122.0 135.612 4.940 -999.990 -999.990 1.356 ..P WKT 2010 09 03 18 39 55 31.3200 -97.3300 251.000 457.0 129.301 5.560 -999.990 -999.990 1.293 ..P WKT 2010 09 03 18 49 55 31.3200 -97.3300 251.000 30.0 133.064 5.150 -999.990 -999.990 1.331 ..P WKT 2010 09 03 18 54 55 31.3200 -97.3300 251.000 122.0 140.619 5.960 -999.990 -999.990 1.406 ..P WKT 2010 09 03 18 59 55 31.3200 -97.3300 251.000 457.0 137.809 4.940 -999.990 -999.990 1.378 ..P WKT 2010 09 03 19 04 55 31.3200 -97.3300 251.000 30.0 132.756 5.030 -999.990 -999.990 1.328 ..P WKT 2010 09 03 19 09 55 31.3200 -97.3300 251.000 122.0 133.447 4.800 -999.990 -999.990 1.334 ..P WKT 2010 09 03 19 14 55 31.3200 -97.3300 251.000 457.0 129.514 5.000 -999.990 -999.990 1.295 ..P WKT 2010 09 03 19 24 55 31.3200 -97.3300 251.000 30.0 127.712 4.710 -999.990 -999.990 1.277 ..P WKT 2010 09 03 19 29 55 31.3200 -97.3300 251.000 122.0 134.191 5.240 -999.990 -999.990 1.342 ..P WKT 2010 09 03 19 34 55 31.3200 -97.3300 251.000 457.0 136.185 5.950 -999.990 -999.990 1.362 ..P WKT 2010 09 03 19 39 55 31.3200 -97.3300 251.000 30.0 128.644 5.640 -999.990 -999.990 1.286 ..P WKT 2010 09 03 19 44 55 31.3200 -97.3300 251.000 122.0 134.003 6.030 -999.990 -999.990 1.340 ..P WKT 2010 09 03 19 49 55 31.3200 -97.3300 251.000 457.0 128.985 6.550 -999.990 -999.990 1.290 ..P WKT 2010 09 03 19 59 55 31.3200 -97.3300 251.000 30.0 126.822 6.070 -999.990 -999.990 1.268 ..P WKT 2010 09 03 20 04 55 31.3200 -97.3300 251.000 122.0 135.569 5.860 -999.990 -999.990 1.356 ..P WKT 2010 09 03 20 09 55 31.3200 -97.3300 251.000 457.0 133.656 5.750 -999.990 -999.990 1.337 ..P WKT 2010 09 03 20 14 55 31.3200 -97.3300 251.000 30.0 139.039 4.860 -999.990 -999.990 1.390 ..P WKT 2010 09 03 20 19 55 31.3200 -97.3300 251.000 122.0 141.336 4.690 -999.990 -999.990 1.413 ..P WKT 2010 09 03 20 24 55 31.3200 -97.3300 251.000 457.0 131.564 4.880 -999.990 -999.990 1.316 ..P WKT 2010 09 03 20 34 55 31.3200 -97.3300 251.000 30.0 141.972 4.850 -999.990 -999.990 1.420 ..P WKT 2010 09 03 20 39 55 31.3200 -97.3300 251.000 122.0 141.102 5.840 -999.990 -999.990 1.411 ..P WKT 2010 09 03 20 44 55 31.3200 -97.3300 251.000 457.0 132.368 5.150 -999.990 -999.990 1.324 ..P WKT 2010 09 03 20 49 55 31.3200 -97.3300 251.000 30.0 130.935 4.820 -999.990 -999.990 1.309 ..P WKT 2010 09 03 20 54 55 31.3200 -97.3300 251.000 122.0 134.556 5.150 -999.990 -999.990 1.346 ..P WKT 2010 09 03 20 59 55 31.3200 -97.3300 251.000 457.0 133.965 4.680 -999.990 -999.990 1.340 ..P WKT 2010 09 03 21 09 55 31.3200 -97.3300 251.000 30.0 132.462 5.140 -999.990 -999.990 1.325 ..P WKT 2010 09 03 21 14 55 31.3200 -97.3300 251.000 122.0 144.193 4.810 -999.990 -999.990 1.442 ..P WKT 2010 09 03 21 19 55 31.3200 -97.3300 251.000 457.0 137.381 4.910 -999.990 -999.990 1.374 ..P WKT 2010 09 03 21 24 55 31.3200 -97.3300 251.000 30.0 130.287 4.820 -999.990 -999.990 1.303 ..P WKT 2010 09 03 21 29 55 31.3200 -97.3300 251.000 122.0 128.952 5.690 -999.990 -999.990 1.290 ..P WKT 2010 09 03 21 34 55 31.3200 -97.3300 251.000 457.0 129.163 5.090 -999.990 -999.990 1.292 ..P WKT 2010 09 03 21 44 55 31.3200 -97.3300 251.000 30.0 132.719 4.910 -999.990 -999.990 1.327 ..P WKT 2010 09 03 21 49 55 31.3200 -97.3300 251.000 122.0 140.843 5.160 -999.990 -999.990 1.408 ..P WKT 2010 09 03 21 54 55 31.3200 -97.3300 251.000 457.0 136.033 5.270 -999.990 -999.990 1.360 ..P WKT 2010 09 03 21 59 55 31.3200 -97.3300 251.000 30.0 135.864 5.150 -999.990 -999.990 1.359 ..P WKT 2010 09 03 22 04 55 31.3200 -97.3300 251.000 122.0 138.507 5.120 -999.990 -999.990 1.385 ..P WKT 2010 09 03 22 09 55 31.3200 -97.3300 251.000 457.0 141.713 5.110 -999.990 -999.990 1.417 ..P WKT 2010 09 03 22 19 55 31.3200 -97.3300 251.000 30.0 144.369 5.010 -999.990 -999.990 1.444 ..P WKT 2010 09 03 22 24 55 31.3200 -97.3300 251.000 122.0 146.210 5.130 -999.990 -999.990 1.462 ..P WKT 2010 09 03 22 29 55 31.3200 -97.3300 251.000 457.0 146.362 5.370 -999.990 -999.990 1.464 ..P WKT 2010 09 03 22 34 55 31.3200 -97.3300 251.000 30.0 158.617 6.010 -999.990 -999.990 1.586 ..P WKT 2010 09 03 22 39 55 31.3200 -97.3300 251.000 122.0 167.778 5.120 -999.990 -999.990 1.678 ..P WKT 2010 09 03 22 44 55 31.3200 -97.3300 251.000 457.0 153.155 5.060 -999.990 -999.990 1.532 ..P WKT 2010 09 03 22 54 55 31.3200 -97.3300 251.000 30.0 155.413 5.420 -999.990 -999.990 1.554 ..P WKT 2010 09 03 22 59 55 31.3200 -97.3300 251.000 122.0 164.134 5.410 -999.990 -999.990 1.641 ..P WKT 2010 09 03 23 04 55 31.3200 -97.3300 251.000 457.0 156.243 5.050 -999.990 -999.990 1.562 ..P WKT 2010 09 03 23 09 55 31.3200 -97.3300 251.000 30.0 159.194 5.070 -999.990 -999.990 1.592 ..P WKT 2010 09 03 23 14 55 31.3200 -97.3300 251.000 122.0 162.989 5.590 -999.990 -999.990 1.630 ..P WKT 2010 09 03 23 19 55 31.3200 -97.3300 251.000 457.0 149.884 5.270 -999.990 -999.990 1.499 ..P WKT 2010 09 03 23 29 55 31.3200 -97.3300 251.000 30.0 153.904 5.290 -999.990 -999.990 1.539 ..P WKT 2010 09 03 23 34 55 31.3200 -97.3300 251.000 122.0 158.355 5.390 -999.990 -999.990 1.584 ..P WKT 2010 09 03 23 39 55 31.3200 -97.3300 251.000 457.0 158.861 5.820 -999.990 -999.990 1.589 ..P WKT 2010 09 03 23 44 55 31.3200 -97.3300 251.000 30.0 153.168 5.160 -999.990 -999.990 1.532 ..P WKT 2010 09 03 23 49 55 31.3200 -97.3300 251.000 122.0 152.265 5.580 -999.990 -999.990 1.523 ..P WKT 2010 09 04 00 09 55 31.3200 -97.3300 251.000 457.0 142.823 5.720 -999.990 -999.990 1.428 ..P WKT 2010 09 04 00 10 25 31.3200 -97.3300 251.000 457.0 148.716 4.680 -999.990 -999.990 1.487 ..P WKT 2010 09 04 00 10 55 31.3200 -97.3300 251.000 457.0 152.918 6.070 -999.990 -999.990 1.529 ..P WKT 2010 09 04 00 11 25 31.3200 -97.3300 251.000 457.0 144.999 4.800 -999.990 -999.990 1.450 ..P WKT 2010 09 04 00 11 55 31.3200 -97.3300 251.000 457.0 144.691 4.670 -999.990 -999.990 1.447 ..P WKT 2010 09 04 00 12 25 31.3200 -97.3300 251.000 457.0 148.047 4.880 -999.990 -999.990 1.480 ..P WKT 2010 09 04 00 12 55 31.3200 -97.3300 251.000 457.0 143.509 5.720 -999.990 -999.990 1.435 ..P WKT 2010 09 04 00 13 25 31.3200 -97.3300 251.000 457.0 139.537 5.090 -999.990 -999.990 1.395 ..P WKT 2010 09 04 00 13 55 31.3200 -97.3300 251.000 457.0 139.228 4.990 -999.990 -999.990 1.392 ..P WKT 2010 09 04 00 14 25 31.3200 -97.3300 251.000 457.0 141.738 6.070 -999.990 -999.990 1.417 ..P WKT 2010 09 04 00 14 55 31.3200 -97.3300 251.000 457.0 154.114 4.770 -999.990 -999.990 1.541 ..P WKT 2010 09 04 00 19 55 31.3200 -97.3300 251.000 30.0 142.291 4.580 -999.990 -999.990 1.423 ..P WKT 2010 09 04 00 24 55 31.3200 -97.3300 251.000 122.0 146.535 4.580 -999.990 -999.990 1.465 ..P WKT 2010 09 04 00 29 55 31.3200 -97.3300 251.000 457.0 138.660 4.940 -999.990 -999.990 1.387 ..P WKT 2010 09 04 00 34 55 31.3200 -97.3300 251.000 30.0 136.139 4.950 -999.990 -999.990 1.361 ..P WKT 2010 09 04 00 39 55 31.3200 -97.3300 251.000 122.0 146.582 5.030 -999.990 -999.990 1.466 ..P WKT 2010 09 04 00 44 55 31.3200 -97.3300 251.000 457.0 142.652 5.960 -999.990 -999.990 1.427 ..P WKT 2010 09 04 00 54 55 31.3200 -97.3300 251.000 30.0 135.559 4.550 -999.990 -999.990 1.356 ..P WKT 2010 09 04 00 59 55 31.3200 -97.3300 251.000 122.0 137.749 5.300 -999.990 -999.990 1.377 ..P WKT 2010 09 04 01 04 55 31.3200 -97.3300 251.000 457.0 143.037 5.270 -999.990 -999.990 1.430 ..P WKT 2010 09 04 01 09 55 31.3200 -97.3300 251.000 30.0 132.830 5.290 -999.990 -999.990 1.328 ..P WKT 2010 09 04 01 14 55 31.3200 -97.3300 251.000 122.0 137.555 5.920 -999.990 -999.990 1.376 ..P WKT 2010 09 04 01 19 55 31.3200 -97.3300 251.000 457.0 145.096 4.980 -999.990 -999.990 1.451 ..P WKT 2010 09 04 01 29 55 31.3200 -97.3300 251.000 30.0 129.094 5.220 -999.990 -999.990 1.291 ..P WKT 2010 09 04 01 34 55 31.3200 -97.3300 251.000 122.0 137.519 5.260 -999.990 -999.990 1.375 ..P WKT 2010 09 04 01 39 55 31.3200 -97.3300 251.000 457.0 141.015 4.710 -999.990 -999.990 1.410 ..P WKT 2010 09 04 01 44 55 31.3200 -97.3300 251.000 30.0 126.910 5.090 -999.990 -999.990 1.269 ..P WKT 2010 09 04 01 49 55 31.3200 -97.3300 251.000 122.0 136.180 5.250 -999.990 -999.990 1.362 ..P WKT 2010 09 04 01 54 55 31.3200 -97.3300 251.000 457.0 136.859 5.120 -999.990 -999.990 1.369 ..P WKT 2010 09 04 02 04 55 31.3200 -97.3300 251.000 30.0 134.578 4.610 -999.990 -999.990 1.346 ..P WKT 2010 09 04 02 09 55 31.3200 -97.3300 251.000 122.0 133.589 5.200 -999.990 -999.990 1.336 ..P WKT 2010 09 04 02 14 55 31.3200 -97.3300 251.000 457.0 129.925 4.910 -999.990 -999.990 1.299 ..P WKT 2010 09 04 02 19 55 31.3200 -97.3300 251.000 30.0 127.248 6.370 -999.990 -999.990 1.272 ..P WKT 2010 09 04 02 24 55 31.3200 -97.3300 251.000 122.0 126.118 5.190 -999.990 -999.990 1.261 ..P WKT 2010 09 04 02 29 55 31.3200 -97.3300 251.000 457.0 124.425 5.500 -999.990 -999.990 1.244 ..P WKT 2010 09 04 02 39 55 31.3200 -97.3300 251.000 30.0 129.565 4.680 -999.990 -999.990 1.296 ..P WKT 2010 09 04 02 44 55 31.3200 -97.3300 251.000 122.0 122.184 5.170 -999.990 -999.990 1.222 ..P WKT 2010 09 04 02 49 55 31.3200 -97.3300 251.000 457.0 126.905 5.870 -999.990 -999.990 1.269 ..P WKT 2010 09 04 02 54 55 31.3200 -97.3300 251.000 30.0 135.846 5.740 -999.990 -999.990 1.358 ..P WKT 2010 09 04 02 59 55 31.3200 -97.3300 251.000 122.0 132.546 5.410 -999.990 -999.990 1.325 ..P WKT 2010 09 04 03 04 55 31.3200 -97.3300 251.000 457.0 131.356 5.200 -999.990 -999.990 1.314 ..P WKT 2010 09 04 03 14 55 31.3200 -97.3300 251.000 30.0 150.983 4.960 -999.990 -999.990 1.510 ..P WKT 2010 09 04 03 19 55 31.3200 -97.3300 251.000 122.0 145.633 5.370 -999.990 -999.990 1.456 ..P WKT 2010 09 04 03 24 55 31.3200 -97.3300 251.000 457.0 134.516 5.570 -999.990 -999.990 1.345 ..P WKT 2010 09 04 03 29 55 31.3200 -97.3300 251.000 30.0 150.125 5.010 -999.990 -999.990 1.501 ..P WKT 2010 09 04 03 34 55 31.3200 -97.3300 251.000 122.0 154.480 6.400 -999.990 -999.990 1.545 ..P WKT 2010 09 04 03 39 55 31.3200 -97.3300 251.000 457.0 131.832 4.040 -999.990 -999.990 1.318 ..P WKT 2010 09 04 03 49 55 31.3200 -97.3300 251.000 30.0 146.611 3.810 -999.990 -999.990 1.466 ..P WKT 2010 09 04 03 54 55 31.3200 -97.3300 251.000 122.0 148.032 4.110 -999.990 -999.990 1.480 ..P WKT 2010 09 04 03 59 55 31.3200 -97.3300 251.000 457.0 125.831 4.040 -999.990 -999.990 1.258 ..P WKT 2010 09 04 04 04 55 31.3200 -97.3300 251.000 30.0 137.378 4.590 -999.990 -999.990 1.374 ..P WKT 2010 09 04 04 09 55 31.3200 -97.3300 251.000 122.0 152.296 4.700 -999.990 -999.990 1.523 ..P WKT 2010 09 04 04 14 55 31.3200 -97.3300 251.000 457.0 132.348 3.970 -999.990 -999.990 1.323 ..P WKT 2010 09 04 04 24 55 31.3200 -97.3300 251.000 30.0 146.598 3.640 -999.990 -999.990 1.466 ..P WKT 2010 09 04 04 29 55 31.3200 -97.3300 251.000 122.0 138.341 3.940 -999.990 -999.990 1.383 ..P WKT 2010 09 04 04 34 55 31.3200 -97.3300 251.000 457.0 132.052 3.670 -999.990 -999.990 1.321 ..P WKT 2010 09 04 04 39 55 31.3200 -97.3300 251.000 30.0 148.814 3.780 -999.990 -999.990 1.488 ..P WKT 2010 09 04 04 44 55 31.3200 -97.3300 251.000 122.0 141.119 3.840 -999.990 -999.990 1.411 ..P WKT 2010 09 04 04 49 55 31.3200 -97.3300 251.000 457.0 123.589 4.230 -999.990 -999.990 1.236 ..P WKT 2010 09 04 05 04 55 31.3200 -97.3300 251.000 30.0 145.192 3.470 -999.990 -999.990 1.452 ..P WKT 2010 09 04 05 09 55 31.3200 -97.3300 251.000 122.0 142.416 4.030 -999.990 -999.990 1.424 ..P WKT 2010 09 04 05 14 55 31.3200 -97.3300 251.000 457.0 128.400 3.620 -999.990 -999.990 1.284 ..P WKT 2010 09 04 05 19 55 31.3200 -97.3300 251.000 30.0 146.275 3.800 -999.990 -999.990 1.463 ..P WKT 2010 09 04 05 24 55 31.3200 -97.3300 251.000 122.0 148.416 3.290 -999.990 -999.990 1.484 ..P WKT 2010 09 04 05 29 55 31.3200 -97.3300 251.000 457.0 134.261 4.180 -999.990 -999.990 1.343 ..P WKT 2010 09 04 05 39 55 31.3200 -97.3300 251.000 30.0 150.122 4.380 -999.990 -999.990 1.501 ..P WKT 2010 09 04 05 44 55 31.3200 -97.3300 251.000 122.0 153.027 4.080 -999.990 -999.990 1.530 ..P WKT 2010 09 04 05 49 55 31.3200 -97.3300 251.000 457.0 126.017 3.740 -999.990 -999.990 1.260 ..P WKT 2010 09 04 05 54 55 31.3200 -97.3300 251.000 30.0 149.988 3.270 -999.990 -999.990 1.500 ..P WKT 2010 09 04 05 59 55 31.3200 -97.3300 251.000 122.0 153.313 3.570 -999.990 -999.990 1.533 ..P WKT 2010 09 04 06 04 55 31.3200 -97.3300 251.000 457.0 132.627 3.660 -999.990 -999.990 1.326 ..P WKT 2010 09 04 06 14 55 31.3200 -97.3300 251.000 30.0 145.857 4.450 -999.990 -999.990 1.459 ..P WKT 2010 09 04 06 19 55 31.3200 -97.3300 251.000 122.0 147.056 4.880 -999.990 -999.990 1.471 ..P WKT 2010 09 04 06 24 55 31.3200 -97.3300 251.000 457.0 127.899 5.500 -999.990 -999.990 1.279 ..P WKT 2010 09 04 06 29 55 31.3200 -97.3300 251.000 30.0 146.786 3.500 -999.990 -999.990 1.468 ..P WKT 2010 09 04 06 34 55 31.3200 -97.3300 251.000 122.0 144.335 3.690 -999.990 -999.990 1.443 ..P WKT 2010 09 04 06 39 55 31.3200 -97.3300 251.000 457.0 127.567 4.000 -999.990 -999.990 1.276 ..P WKT 2010 09 04 06 49 55 31.3200 -97.3300 251.000 30.0 146.528 4.120 -999.990 -999.990 1.465 ..P WKT 2010 09 04 06 54 55 31.3200 -97.3300 251.000 122.0 143.235 5.460 -999.990 -999.990 1.432 ..P WKT 2010 09 04 06 59 55 31.3200 -97.3300 251.000 457.0 120.016 5.120 -999.990 -999.990 1.200 ..P WKT 2010 09 04 07 04 55 31.3200 -97.3300 251.000 30.0 151.245 4.820 -999.990 -999.990 1.512 ..P WKT 2010 09 04 07 09 55 31.3200 -97.3300 251.000 122.0 137.710 4.800 -999.990 -999.990 1.377 ..P WKT 2010 09 04 07 14 55 31.3200 -97.3300 251.000 457.0 124.597 6.650 -999.990 -999.990 1.246 ..P WKT 2010 09 04 07 24 55 31.3200 -97.3300 251.000 30.0 144.351 5.290 -999.990 -999.990 1.444 ..P WKT 2010 09 04 07 29 55 31.3200 -97.3300 251.000 122.0 139.477 4.220 -999.990 -999.990 1.395 ..P WKT 2010 09 04 07 34 55 31.3200 -97.3300 251.000 457.0 134.323 4.660 -999.990 -999.990 1.343 ..P WKT 2010 09 04 07 39 55 31.3200 -97.3300 251.000 30.0 143.196 3.940 -999.990 -999.990 1.432 ..P WKT 2010 09 04 07 44 55 31.3200 -97.3300 251.000 122.0 148.421 4.470 -999.990 -999.990 1.484 ..P WKT 2010 09 04 07 49 55 31.3200 -97.3300 251.000 457.0 130.925 3.670 -999.990 -999.990 1.309 ..P WKT 2010 09 04 07 59 55 31.3200 -97.3300 251.000 30.0 152.314 3.640 -999.990 -999.990 1.523 ..P WKT 2010 09 04 08 04 55 31.3200 -97.3300 251.000 122.0 143.235 3.950 -999.990 -999.990 1.432 ..P WKT 2010 09 04 08 09 55 31.3200 -97.3300 251.000 457.0 130.230 4.480 -999.990 -999.990 1.302 ..P WKT 2010 09 04 08 14 55 31.3200 -97.3300 251.000 30.0 154.804 3.660 -999.990 -999.990 1.548 ..P WKT 2010 09 04 08 19 55 31.3200 -97.3300 251.000 122.0 149.371 3.650 -999.990 -999.990 1.494 ..P WKT 2010 09 04 08 24 55 31.3200 -97.3300 251.000 457.0 138.891 3.760 -999.990 -999.990 1.389 ..P WKT 2010 09 04 08 34 55 31.3200 -97.3300 251.000 30.0 157.107 5.650 -999.990 -999.990 1.571 ..P WKT 2010 09 04 08 39 55 31.3200 -97.3300 251.000 122.0 149.072 3.810 -999.990 -999.990 1.491 ..P WKT 2010 09 04 08 44 55 31.3200 -97.3300 251.000 457.0 136.272 3.940 -999.990 -999.990 1.363 ..P WKT 2010 09 04 08 49 55 31.3200 -97.3300 251.000 30.0 155.149 4.330 -999.990 -999.990 1.551 ..P WKT 2010 09 04 08 54 55 31.3200 -97.3300 251.000 122.0 146.275 3.550 -999.990 -999.990 1.463 ..P WKT 2010 09 04 08 59 55 31.3200 -97.3300 251.000 457.0 130.955 3.530 -999.990 -999.990 1.310 ..P WKT 2010 09 04 09 09 55 31.3200 -97.3300 251.000 30.0 152.848 3.760 -999.990 -999.990 1.528 ..P WKT 2010 09 04 09 14 55 31.3200 -97.3300 251.000 122.0 151.522 4.120 -999.990 -999.990 1.515 ..P WKT 2010 09 04 09 19 55 31.3200 -97.3300 251.000 457.0 136.044 3.740 -999.990 -999.990 1.360 ..P WKT 2010 09 04 09 24 55 31.3200 -97.3300 251.000 30.0 155.034 4.450 -999.990 -999.990 1.550 ..P WKT 2010 09 04 09 29 55 31.3200 -97.3300 251.000 122.0 146.284 3.660 -999.990 -999.990 1.463 ..P WKT 2010 09 04 09 34 55 31.3200 -97.3300 251.000 457.0 129.968 4.480 -999.990 -999.990 1.300 ..P WKT 2010 09 04 09 44 55 31.3200 -97.3300 251.000 30.0 151.532 3.980 -999.990 -999.990 1.515 ..P WKT 2010 09 04 09 49 55 31.3200 -97.3300 251.000 122.0 143.044 3.230 -999.990 -999.990 1.430 ..P WKT 2010 09 04 09 54 55 31.3200 -97.3300 251.000 457.0 125.592 4.430 -999.990 -999.990 1.256 ..P WKT 2010 09 04 09 59 55 31.3200 -97.3300 251.000 30.0 155.200 3.740 -999.990 -999.990 1.552 ..P WKT 2010 09 04 10 04 55 31.3200 -97.3300 251.000 122.0 149.513 2.550 -999.990 -999.990 1.495 ..P WKT 2010 09 04 10 09 55 31.3200 -97.3300 251.000 457.0 126.463 3.010 -999.990 -999.990 1.265 ..P WKT 2010 09 04 10 19 55 31.3200 -97.3300 251.000 30.0 153.660 3.550 -999.990 -999.990 1.537 ..P WKT 2010 09 04 10 24 55 31.3200 -97.3300 251.000 122.0 156.155 3.740 -999.990 -999.990 1.562 ..P WKT 2010 09 04 10 29 55 31.3200 -97.3300 251.000 457.0 146.190 3.650 -999.990 -999.990 1.462 ..P WKT 2010 09 04 10 34 55 31.3200 -97.3300 251.000 30.0 159.325 4.490 -999.990 -999.990 1.593 ..P WKT 2010 09 04 10 39 55 31.3200 -97.3300 251.000 122.0 159.860 5.520 -999.990 -999.990 1.599 ..P WKT 2010 09 04 10 44 55 31.3200 -97.3300 251.000 457.0 145.697 4.320 -999.990 -999.990 1.457 ..P WKT 2010 09 04 10 54 55 31.3200 -97.3300 251.000 30.0 154.045 4.240 -999.990 -999.990 1.540 ..P WKT 2010 09 04 10 59 55 31.3200 -97.3300 251.000 122.0 151.641 4.240 -999.990 -999.990 1.516 ..P WKT 2010 09 04 11 04 55 31.3200 -97.3300 251.000 457.0 142.240 5.300 -999.990 -999.990 1.422 ..P WKT 2010 09 04 11 09 55 31.3200 -97.3300 251.000 30.0 151.872 4.080 -999.990 -999.990 1.519 ..P WKT 2010 09 04 11 14 55 31.3200 -97.3300 251.000 122.0 160.383 3.880 -999.990 -999.990 1.604 ..P WKT 2010 09 04 11 19 55 31.3200 -97.3300 251.000 457.0 132.234 2.500 -999.990 -999.990 1.322 ..P WKT 2010 09 04 11 29 55 31.3200 -97.3300 251.000 30.0 148.944 2.630 -999.990 -999.990 1.489 ..P WKT 2010 09 04 11 34 55 31.3200 -97.3300 251.000 122.0 148.191 3.810 -999.990 -999.990 1.482 ..P WKT 2010 09 04 11 39 55 31.3200 -97.3300 251.000 457.0 133.728 3.920 -999.990 -999.990 1.337 ..P WKT 2010 09 04 11 44 55 31.3200 -97.3300 251.000 30.0 151.159 4.290 -999.990 -999.990 1.512 ..P WKT 2010 09 04 11 49 55 31.3200 -97.3300 251.000 122.0 146.208 4.660 -999.990 -999.990 1.462 ..P WKT 2010 09 04 12 09 55 31.3200 -97.3300 251.000 457.0 149.635 3.320 -999.990 -999.990 1.496 ..P WKT 2010 09 04 12 10 25 31.3200 -97.3300 251.000 457.0 149.343 3.620 -999.990 -999.990 1.493 ..P WKT 2010 09 04 12 10 55 31.3200 -97.3300 251.000 457.0 146.815 2.160 -999.990 -999.990 1.468 ..P WKT 2010 09 04 12 11 25 31.3200 -97.3300 251.000 457.0 147.082 2.350 -999.990 -999.990 1.471 ..P WKT 2010 09 04 12 11 55 31.3200 -97.3300 251.000 457.0 141.477 2.820 -999.990 -999.990 1.415 ..P WKT 2010 09 04 12 12 25 31.3200 -97.3300 251.000 457.0 135.034 3.410 -999.990 -999.990 1.350 ..P WKT 2010 09 04 12 12 55 31.3200 -97.3300 251.000 457.0 129.430 2.300 -999.990 -999.990 1.294 ..P WKT 2010 09 04 12 13 25 31.3200 -97.3300 251.000 457.0 135.290 3.540 -999.990 -999.990 1.353 ..P WKT 2010 09 04 12 13 55 31.3200 -97.3300 251.000 457.0 132.203 3.360 -999.990 -999.990 1.322 ..P WKT 2010 09 04 12 14 25 31.3200 -97.3300 251.000 457.0 127.158 2.560 -999.990 -999.990 1.272 ..P WKT 2010 09 04 12 14 55 31.3200 -97.3300 251.000 457.0 133.018 2.610 -999.990 -999.990 1.330 ..P WKT 2010 09 04 12 19 55 31.3200 -97.3300 251.000 30.0 150.796 2.290 -999.990 -999.990 1.508 ..P WKT 2010 09 04 12 24 55 31.3200 -97.3300 251.000 122.0 149.558 3.140 -999.990 -999.990 1.496 ..P WKT 2010 09 04 12 29 55 31.3200 -97.3300 251.000 457.0 130.992 2.490 -999.990 -999.990 1.310 ..P WKT 2010 09 04 12 34 55 31.3200 -97.3300 251.000 30.0 150.719 3.090 -999.990 -999.990 1.507 ..P WKT 2010 09 04 12 39 55 31.3200 -97.3300 251.000 122.0 158.983 2.490 -999.990 -999.990 1.590 ..P WKT 2010 09 04 12 44 55 31.3200 -97.3300 251.000 457.0 132.599 3.890 -999.990 -999.990 1.326 ..P WKT 2010 09 04 12 54 55 31.3200 -97.3300 251.000 30.0 157.021 3.020 -999.990 -999.990 1.570 ..P WKT 2010 09 04 12 59 55 31.3200 -97.3300 251.000 122.0 169.683 2.610 -999.990 -999.990 1.697 ..P WKT 2010 09 04 13 04 55 31.3200 -97.3300 251.000 457.0 131.236 3.320 -999.990 -999.990 1.312 ..P WKT 2010 09 04 13 09 55 31.3200 -97.3300 251.000 30.0 170.565 3.130 -999.990 -999.990 1.706 ..P WKT 2010 09 04 13 14 55 31.3200 -97.3300 251.000 122.0 168.423 3.180 -999.990 -999.990 1.684 ..P WKT 2010 09 04 13 19 55 31.3200 -97.3300 251.000 457.0 132.084 3.700 -999.990 -999.990 1.321 ..P WKT 2010 09 04 13 29 55 31.3200 -97.3300 251.000 30.0 169.216 3.810 -999.990 -999.990 1.692 ..P WKT 2010 09 04 13 34 55 31.3200 -97.3300 251.000 122.0 167.036 3.550 -999.990 -999.990 1.670 ..P WKT 2010 09 04 13 39 55 31.3200 -97.3300 251.000 457.0 137.372 3.370 -999.990 -999.990 1.374 ..P WKT 2010 09 04 13 44 55 31.3200 -97.3300 251.000 30.0 171.464 4.220 -999.990 -999.990 1.715 ..P WKT 2010 09 04 13 49 55 31.3200 -97.3300 251.000 122.0 165.379 3.190 -999.990 -999.990 1.654 ..P WKT 2010 09 04 13 54 55 31.3200 -97.3300 251.000 457.0 128.615 3.680 -999.990 -999.990 1.286 ..P WKT 2010 09 04 14 04 55 31.3200 -97.3300 251.000 30.0 167.588 3.140 -999.990 -999.990 1.676 ..P WKT 2010 09 04 14 09 55 31.3200 -97.3300 251.000 122.0 164.812 3.560 -999.990 -999.990 1.648 ..P WKT 2010 09 04 14 14 55 31.3200 -97.3300 251.000 457.0 133.323 2.960 -999.990 -999.990 1.333 ..P WKT 2010 09 04 14 19 55 31.3200 -97.3300 251.000 30.0 159.680 3.640 -999.990 -999.990 1.597 ..P WKT 2010 09 04 14 24 55 31.3200 -97.3300 251.000 122.0 166.103 3.590 -999.990 -999.990 1.661 ..P WKT 2010 09 04 14 29 55 31.3200 -97.3300 251.000 457.0 129.331 3.610 -999.990 -999.990 1.293 ..P WKT 2010 09 04 14 39 55 31.3200 -97.3300 251.000 30.0 161.703 3.220 -999.990 -999.990 1.617 ..P WKT 2010 09 04 14 44 55 31.3200 -97.3300 251.000 122.0 167.168 4.160 -999.990 -999.990 1.672 ..P WKT 2010 09 04 14 49 55 31.3200 -97.3300 251.000 457.0 131.687 4.470 -999.990 -999.990 1.317 ..P WKT 2010 09 04 14 54 55 31.3200 -97.3300 251.000 30.0 162.776 4.620 -999.990 -999.990 1.628 ..P WKT 2010 09 04 14 59 55 31.3200 -97.3300 251.000 122.0 164.898 3.830 -999.990 -999.990 1.649 ..P WKT 2010 09 04 15 04 55 31.3200 -97.3300 251.000 457.0 149.477 4.420 -999.990 -999.990 1.495 ..P WKT 2010 09 04 15 14 55 31.3200 -97.3300 251.000 30.0 161.714 4.150 -999.990 -999.990 1.617 ..P WKT 2010 09 04 15 19 55 31.3200 -97.3300 251.000 122.0 163.477 4.390 -999.990 -999.990 1.635 ..P WKT 2010 09 04 15 24 55 31.3200 -97.3300 251.000 457.0 134.070 4.740 -999.990 -999.990 1.341 ..P WKT 2010 09 04 15 29 55 31.3200 -97.3300 251.000 30.0 146.966 5.580 -999.990 -999.990 1.470 ..P WKT 2010 09 04 15 34 55 31.3200 -97.3300 251.000 122.0 160.415 6.170 -999.990 -999.990 1.604 ..P WKT 2010 09 04 15 39 55 31.3200 -97.3300 251.000 457.0 137.696 3.750 -999.990 -999.990 1.377 ..P WKT 2010 09 04 15 49 55 31.3200 -97.3300 251.000 30.0 152.031 3.360 -999.990 -999.990 1.520 ..P WKT 2010 09 04 15 54 55 31.3200 -97.3300 251.000 122.0 154.031 4.800 -999.990 -999.990 1.540 ..P WKT 2010 09 04 15 59 55 31.3200 -97.3300 251.000 457.0 140.739 6.050 -999.990 -999.990 1.407 ..P WKT 2010 09 04 16 04 55 31.3200 -97.3300 251.000 30.0 152.471 4.610 -999.990 -999.990 1.525 ..P WKT 2010 09 04 16 09 55 31.3200 -97.3300 251.000 122.0 160.308 5.240 -999.990 -999.990 1.603 ..P WKT 2010 09 04 16 14 55 31.3200 -97.3300 251.000 457.0 163.418 3.860 -999.990 -999.990 1.634 ..P WKT 2010 09 04 16 24 55 31.3200 -97.3300 251.000 30.0 163.166 3.230 -999.990 -999.990 1.632 ..P WKT 2010 09 04 16 29 55 31.3200 -97.3300 251.000 122.0 162.583 4.620 -999.990 -999.990 1.626 ..P WKT 2010 09 04 16 34 55 31.3200 -97.3300 251.000 457.0 157.278 4.600 -999.990 -999.990 1.573 ..P WKT 2010 09 04 16 39 55 31.3200 -97.3300 251.000 30.0 153.919 4.360 -999.990 -999.990 1.539 ..P WKT 2010 09 04 16 44 55 31.3200 -97.3300 251.000 122.0 163.335 4.420 -999.990 -999.990 1.633 ..P WKT 2010 09 04 16 49 55 31.3200 -97.3300 251.000 457.0 156.921 4.700 -999.990 -999.990 1.569 ..P WKT 2010 09 04 17 04 55 31.3200 -97.3300 251.000 30.0 152.783 4.720 -999.990 -999.990 1.528 ..P WKT 2010 09 04 17 09 55 31.3200 -97.3300 251.000 122.0 157.667 4.680 -999.990 -999.990 1.577 ..P WKT 2010 09 04 17 14 55 31.3200 -97.3300 251.000 457.0 141.319 4.910 -999.990 -999.990 1.413 ..P WKT 2010 09 04 17 19 55 31.3200 -97.3300 251.000 30.0 156.747 4.110 -999.990 -999.990 1.567 ..P WKT 2010 09 04 17 24 55 31.3200 -97.3300 251.000 122.0 163.987 4.360 -999.990 -999.990 1.640 ..P WKT 2010 09 04 17 29 55 31.3200 -97.3300 251.000 457.0 157.215 3.770 -999.990 -999.990 1.572 ..P WKT 2010 09 04 17 39 55 31.3200 -97.3300 251.000 30.0 159.454 4.970 -999.990 -999.990 1.595 ..P WKT 2010 09 04 17 44 55 31.3200 -97.3300 251.000 122.0 157.089 3.450 -999.990 -999.990 1.571 ..P WKT 2010 09 04 17 49 55 31.3200 -97.3300 251.000 457.0 155.558 3.330 -999.990 -999.990 1.556 ..P WKT 2010 09 04 17 54 55 31.3200 -97.3300 251.000 30.0 155.413 3.010 -999.990 -999.990 1.554 ..P WKT 2010 09 04 17 59 55 31.3200 -97.3300 251.000 122.0 159.011 3.160 -999.990 -999.990 1.590 ..P WKT 2010 09 04 18 04 55 31.3200 -97.3300 251.000 457.0 147.224 3.160 -999.990 -999.990 1.472 ..P WKT 2010 09 04 18 14 55 31.3200 -97.3300 251.000 30.0 148.263 5.150 -999.990 -999.990 1.483 ..P WKT 2010 09 04 18 19 55 31.3200 -97.3300 251.000 122.0 157.758 4.010 -999.990 -999.990 1.578 ..P WKT 2010 09 04 18 24 55 31.3200 -97.3300 251.000 457.0 156.583 4.550 -999.990 -999.990 1.566 ..P WKT 2010 09 04 18 29 55 31.3200 -97.3300 251.000 30.0 159.011 2.710 -999.990 -999.990 1.590 ..P WKT 2010 09 04 18 34 55 31.3200 -97.3300 251.000 122.0 152.852 3.340 -999.990 -999.990 1.529 ..P WKT 2010 09 04 18 39 55 31.3200 -97.3300 251.000 457.0 143.094 2.890 -999.990 -999.990 1.431 ..P WKT 2010 09 04 18 49 55 31.3200 -97.3300 251.000 30.0 149.789 2.840 -999.990 -999.990 1.498 ..P WKT 2010 09 04 18 54 55 31.3200 -97.3300 251.000 122.0 153.639 3.470 -999.990 -999.990 1.536 ..P WKT 2010 09 04 18 59 55 31.3200 -97.3300 251.000 457.0 150.707 4.150 -999.990 -999.990 1.507 ..P WKT 2010 09 04 19 04 55 31.3200 -97.3300 251.000 30.0 147.222 3.180 -999.990 -999.990 1.472 ..P WKT 2010 09 04 19 09 55 31.3200 -97.3300 251.000 122.0 152.317 4.760 -999.990 -999.990 1.523 ..P WKT 2010 09 04 19 14 55 31.3200 -97.3300 251.000 457.0 148.280 2.780 -999.990 -999.990 1.483 ..P WKT 2010 09 04 19 24 55 31.3200 -97.3300 251.000 30.0 147.696 2.870 -999.990 -999.990 1.477 ..P WKT 2010 09 04 19 29 55 31.3200 -97.3300 251.000 122.0 150.595 3.080 -999.990 -999.990 1.506 ..P WKT 2010 09 04 19 34 55 31.3200 -97.3300 251.000 457.0 146.303 3.780 -999.990 -999.990 1.463 ..P WKT 2010 09 04 19 39 55 31.3200 -97.3300 251.000 30.0 147.266 4.050 -999.990 -999.990 1.473 ..P WKT 2010 09 04 19 44 55 31.3200 -97.3300 251.000 122.0 156.247 3.740 -999.990 -999.990 1.562 ..P WKT 2010 09 04 19 49 55 31.3200 -97.3300 251.000 457.0 148.638 2.880 -999.990 -999.990 1.486 ..P WKT 2010 09 04 19 59 55 31.3200 -97.3300 251.000 30.0 141.323 2.690 -999.990 -999.990 1.413 ..P WKT 2010 09 04 20 04 55 31.3200 -97.3300 251.000 122.0 147.142 3.460 -999.990 -999.990 1.471 ..P WKT 2010 09 04 20 09 55 31.3200 -97.3300 251.000 457.0 149.367 4.590 -999.990 -999.990 1.494 ..P WKT 2010 09 04 20 14 55 31.3200 -97.3300 251.000 30.0 141.369 4.120 -999.990 -999.990 1.414 ..P WKT 2010 09 04 20 19 55 31.3200 -97.3300 251.000 122.0 151.881 3.380 -999.990 -999.990 1.519 ..P WKT 2010 09 04 20 24 55 31.3200 -97.3300 251.000 457.0 145.819 3.100 -999.990 -999.990 1.458 ..P WKT 2010 09 04 20 34 55 31.3200 -97.3300 251.000 30.0 143.324 3.400 -999.990 -999.990 1.433 ..P WKT 2010 09 04 20 39 55 31.3200 -97.3300 251.000 122.0 157.105 3.390 -999.990 -999.990 1.571 ..P WKT 2010 09 04 20 44 55 31.3200 -97.3300 251.000 457.0 141.620 4.190 -999.990 -999.990 1.416 ..P WKT 2010 09 04 20 49 55 31.3200 -97.3300 251.000 30.0 144.632 3.500 -999.990 -999.990 1.446 ..P WKT 2010 09 04 20 54 55 31.3200 -97.3300 251.000 122.0 156.061 3.220 -999.990 -999.990 1.561 ..P WKT 2010 09 04 20 59 55 31.3200 -97.3300 251.000 457.0 142.651 3.120 -999.990 -999.990 1.427 ..P WKT 2010 09 04 21 09 55 31.3200 -97.3300 251.000 30.0 136.119 2.830 -999.990 -999.990 1.361 ..P WKT 2010 09 04 21 14 55 31.3200 -97.3300 251.000 122.0 146.716 3.820 -999.990 -999.990 1.467 ..P WKT 2010 09 04 21 19 55 31.3200 -97.3300 251.000 457.0 144.899 4.680 -999.990 -999.990 1.449 ..P WKT 2010 09 04 21 24 55 31.3200 -97.3300 251.000 30.0 145.426 3.430 -999.990 -999.990 1.454 ..P WKT 2010 09 04 21 29 55 31.3200 -97.3300 251.000 122.0 152.019 4.160 -999.990 -999.990 1.520 ..P WKT 2010 09 04 21 34 55 31.3200 -97.3300 251.000 457.0 148.685 3.170 -999.990 -999.990 1.487 ..P WKT 2010 09 04 21 44 55 31.3200 -97.3300 251.000 30.0 148.380 3.580 -999.990 -999.990 1.484 ..P WKT 2010 09 04 21 49 55 31.3200 -97.3300 251.000 122.0 148.926 3.060 -999.990 -999.990 1.489 ..P WKT 2010 09 04 21 54 55 31.3200 -97.3300 251.000 457.0 147.129 4.670 -999.990 -999.990 1.471 ..P WKT 2010 09 04 21 59 55 31.3200 -97.3300 251.000 30.0 144.368 3.330 -999.990 -999.990 1.444 ..P WKT 2010 09 04 22 04 55 31.3200 -97.3300 251.000 122.0 146.568 3.260 -999.990 -999.990 1.466 ..P WKT 2010 09 04 22 09 55 31.3200 -97.3300 251.000 457.0 141.191 3.090 -999.990 -999.990 1.412 ..P WKT 2010 09 04 22 19 55 31.3200 -97.3300 251.000 30.0 146.376 3.460 -999.990 -999.990 1.464 ..P WKT 2010 09 04 22 24 55 31.3200 -97.3300 251.000 122.0 141.925 3.170 -999.990 -999.990 1.419 ..P WKT 2010 09 04 22 29 55 31.3200 -97.3300 251.000 457.0 146.425 5.220 -999.990 -999.990 1.464 ..P WKT 2010 09 04 22 34 55 31.3200 -97.3300 251.000 30.0 137.984 6.000 -999.990 -999.990 1.380 ..P WKT 2010 09 04 22 39 55 31.3200 -97.3300 251.000 122.0 136.426 5.880 -999.990 -999.990 1.364 ..P WKT 2010 09 04 22 44 55 31.3200 -97.3300 251.000 457.0 137.760 3.550 -999.990 -999.990 1.378 ..P WKT 2010 09 04 22 54 55 31.3200 -97.3300 251.000 30.0 137.693 4.200 -999.990 -999.990 1.377 ..P WKT 2010 09 04 22 59 55 31.3200 -97.3300 251.000 122.0 146.199 5.100 -999.990 -999.990 1.462 ..P WKT 2010 09 04 23 04 55 31.3200 -97.3300 251.000 457.0 134.620 6.130 -999.990 -999.990 1.346 ..P WKT 2010 09 04 23 09 55 31.3200 -97.3300 251.000 30.0 142.574 4.850 -999.990 -999.990 1.426 ..P WKT 2010 09 04 23 14 55 31.3200 -97.3300 251.000 122.0 145.575 3.640 -999.990 -999.990 1.456 ..P WKT 2010 09 04 23 19 55 31.3200 -97.3300 251.000 457.0 141.151 4.800 -999.990 -999.990 1.412 ..P WKT 2010 09 04 23 29 55 31.3200 -97.3300 251.000 30.0 146.429 3.820 -999.990 -999.990 1.464 ..P WKT 2010 09 04 23 34 55 31.3200 -97.3300 251.000 122.0 149.532 3.640 -999.990 -999.990 1.495 ..P WKT 2010 09 04 23 39 55 31.3200 -97.3300 251.000 457.0 148.786 4.130 -999.990 -999.990 1.488 ..P WKT 2010 09 04 23 44 55 31.3200 -97.3300 251.000 30.0 146.115 4.250 -999.990 -999.990 1.461 ..P WKT 2010 09 04 23 49 55 31.3200 -97.3300 251.000 122.0 152.514 3.230 -999.990 -999.990 1.525 ..P WKT 2010 09 05 00 09 55 31.3200 -97.3300 251.000 457.0 147.837 2.620 -999.990 -999.990 1.478 ..P WKT 2010 09 05 00 10 25 31.3200 -97.3300 251.000 457.0 146.738 2.620 -999.990 -999.990 1.467 ..P WKT 2010 09 05 00 10 55 31.3200 -97.3300 251.000 457.0 144.815 2.400 -999.990 -999.990 1.448 ..P WKT 2010 09 05 00 11 25 31.3200 -97.3300 251.000 457.0 146.463 2.500 -999.990 -999.990 1.465 ..P WKT 2010 09 05 00 11 55 31.3200 -97.3300 251.000 457.0 147.836 2.540 -999.990 -999.990 1.478 ..P WKT 2010 09 05 00 12 25 31.3200 -97.3300 251.000 457.0 145.912 2.780 -999.990 -999.990 1.459 ..P WKT 2010 09 05 00 12 55 31.3200 -97.3300 251.000 457.0 144.264 2.430 -999.990 -999.990 1.443 ..P WKT 2010 09 05 00 13 25 31.3200 -97.3300 251.000 457.0 144.539 2.430 -999.990 -999.990 1.445 ..P WKT 2010 09 05 00 13 55 31.3200 -97.3300 251.000 457.0 141.518 3.780 -999.990 -999.990 1.415 ..P WKT 2010 09 05 00 14 25 31.3200 -97.3300 251.000 457.0 144.538 4.710 -999.990 -999.990 1.445 ..P WKT 2010 09 05 00 14 55 31.3200 -97.3300 251.000 457.0 147.558 4.420 -999.990 -999.990 1.476 ..P WKT 2010 09 05 00 19 55 31.3200 -97.3300 251.000 30.0 142.338 2.750 -999.990 -999.990 1.423 ..P WKT 2010 09 05 00 24 55 31.3200 -97.3300 251.000 122.0 147.277 3.020 -999.990 -999.990 1.473 ..P WKT 2010 09 05 00 29 55 31.3200 -97.3300 251.000 457.0 143.979 3.810 -999.990 -999.990 1.440 ..P WKT 2010 09 05 00 34 55 31.3200 -97.3300 251.000 30.0 145.898 3.540 -999.990 -999.990 1.459 ..P WKT 2010 09 05 00 39 55 31.3200 -97.3300 251.000 122.0 148.914 2.750 -999.990 -999.990 1.489 ..P WKT 2010 09 05 00 44 55 31.3200 -97.3300 251.000 457.0 148.498 2.710 -999.990 -999.990 1.485 ..P WKT 2010 09 05 00 54 55 31.3200 -97.3300 251.000 30.0 150.040 2.570 -999.990 -999.990 1.500 ..P WKT 2010 09 05 00 59 55 31.3200 -97.3300 251.000 122.0 145.549 2.610 -999.990 -999.990 1.455 ..P WKT 2010 09 05 01 04 55 31.3200 -97.3300 251.000 457.0 138.727 4.000 -999.990 -999.990 1.387 ..P WKT 2010 09 05 01 09 55 31.3200 -97.3300 251.000 30.0 147.266 3.260 -999.990 -999.990 1.473 ..P WKT 2010 09 05 01 14 55 31.3200 -97.3300 251.000 122.0 142.777 4.970 -999.990 -999.990 1.428 ..P WKT 2010 09 05 01 19 55 31.3200 -97.3300 251.000 457.0 142.128 2.550 -999.990 -999.990 1.421 ..P WKT 2010 09 05 01 29 55 31.3200 -97.3300 251.000 30.0 142.807 2.510 -999.990 -999.990 1.428 ..P WKT 2010 09 05 01 34 55 31.3200 -97.3300 251.000 122.0 143.313 2.650 -999.990 -999.990 1.433 ..P WKT 2010 09 05 01 39 55 31.3200 -97.3300 251.000 457.0 148.890 3.250 -999.990 -999.990 1.489 ..P WKT 2010 09 05 01 44 55 31.3200 -97.3300 251.000 30.0 150.080 3.350 -999.990 -999.990 1.501 ..P WKT 2010 09 05 01 49 55 31.3200 -97.3300 251.000 122.0 140.447 4.030 -999.990 -999.990 1.404 ..P WKT 2010 09 05 01 54 55 31.3200 -97.3300 251.000 457.0 142.734 3.310 -999.990 -999.990 1.427 ..P WKT 2010 09 05 02 04 55 31.3200 -97.3300 251.000 30.0 141.104 3.320 -999.990 -999.990 1.411 ..P WKT 2010 09 05 02 09 55 31.3200 -97.3300 251.000 122.0 141.297 4.010 -999.990 -999.990 1.413 ..P WKT 2010 09 05 02 14 55 31.3200 -97.3300 251.000 457.0 140.532 3.250 -999.990 -999.990 1.405 ..P WKT 2010 09 05 02 19 55 31.3200 -97.3300 251.000 30.0 142.368 3.040 -999.990 -999.990 1.424 ..P WKT 2010 09 05 02 24 55 31.3200 -97.3300 251.000 122.0 140.918 2.880 -999.990 -999.990 1.409 ..P WKT 2010 09 05 02 29 55 31.3200 -97.3300 251.000 457.0 142.069 2.930 -999.990 -999.990 1.421 ..P WKT 2010 09 05 02 39 55 31.3200 -97.3300 251.000 30.0 149.102 2.840 -999.990 -999.990 1.491 ..P WKT 2010 09 05 02 44 55 31.3200 -97.3300 251.000 122.0 144.582 3.670 -999.990 -999.990 1.446 ..P WKT 2010 09 05 02 49 55 31.3200 -97.3300 251.000 457.0 152.925 2.570 -999.990 -999.990 1.529 ..P WKT 2010 09 05 02 54 55 31.3200 -97.3300 251.000 30.0 145.533 3.560 -999.990 -999.990 1.455 ..P WKT 2010 09 05 02 59 55 31.3200 -97.3300 251.000 122.0 142.247 3.090 -999.990 -999.990 1.422 ..P WKT 2010 09 05 03 04 55 31.3200 -97.3300 251.000 457.0 154.281 2.840 -999.990 -999.990 1.543 ..P WKT 2010 09 05 03 14 55 31.3200 -97.3300 251.000 30.0 143.411 3.190 -999.990 -999.990 1.434 ..P WKT 2010 09 05 03 19 55 31.3200 -97.3300 251.000 122.0 152.784 2.390 -999.990 -999.990 1.528 ..P WKT 2010 09 05 03 24 55 31.3200 -97.3300 251.000 457.0 145.475 3.300 -999.990 -999.990 1.455 ..P WKT 2010 09 05 03 29 55 31.3200 -97.3300 251.000 30.0 148.831 4.720 -999.990 -999.990 1.488 ..P WKT 2010 09 05 03 34 55 31.3200 -97.3300 251.000 122.0 157.379 2.660 -999.990 -999.990 1.574 ..P WKT 2010 09 05 03 39 55 31.3200 -97.3300 251.000 457.0 155.266 3.070 -999.990 -999.990 1.553 ..P WKT 2010 09 05 03 49 55 31.3200 -97.3300 251.000 30.0 167.437 3.370 -999.990 -999.990 1.674 ..P WKT 2010 09 05 03 54 55 31.3200 -97.3300 251.000 122.0 160.678 3.920 -999.990 -999.990 1.607 ..P WKT 2010 09 05 03 59 55 31.3200 -97.3300 251.000 457.0 151.736 4.720 -999.990 -999.990 1.517 ..P WKT 2010 09 05 04 04 55 31.3200 -97.3300 251.000 30.0 157.820 4.560 -999.990 -999.990 1.578 ..P WKT 2010 09 05 04 09 55 31.3200 -97.3300 251.000 122.0 158.439 5.570 -999.990 -999.990 1.584 ..P WKT 2010 09 05 04 14 55 31.3200 -97.3300 251.000 457.0 153.051 5.450 -999.990 -999.990 1.531 ..P WKT 2010 09 05 04 24 55 31.3200 -97.3300 251.000 30.0 158.425 5.770 -999.990 -999.990 1.584 ..P WKT 2010 09 05 04 29 55 31.3200 -97.3300 251.000 122.0 168.093 5.640 -999.990 -999.990 1.681 ..P WKT 2010 09 05 04 34 55 31.3200 -97.3300 251.000 457.0 149.369 5.890 -999.990 -999.990 1.494 ..P WKT 2010 09 05 04 39 55 31.3200 -97.3300 251.000 30.0 159.855 5.300 -999.990 -999.990 1.599 ..P WKT 2010 09 05 04 44 55 31.3200 -97.3300 251.000 122.0 159.148 5.220 -999.990 -999.990 1.591 ..P WKT 2010 09 05 04 49 55 31.3200 -97.3300 251.000 457.0 176.725 6.850 -999.990 -999.990 1.767 ..P WKT 2010 09 05 05 04 55 31.3200 -97.3300 251.000 30.0 163.864 4.450 -999.990 -999.990 1.639 ..P WKT 2010 09 05 05 09 55 31.3200 -97.3300 251.000 122.0 166.245 4.360 -999.990 -999.990 1.662 ..P WKT 2010 09 05 05 14 55 31.3200 -97.3300 251.000 457.0 165.353 6.960 -999.990 -999.990 1.654 ..P WKT 2010 09 05 05 19 55 31.3200 -97.3300 251.000 30.0 163.371 4.050 -999.990 -999.990 1.634 ..P WKT 2010 09 05 05 24 55 31.3200 -97.3300 251.000 122.0 161.116 5.380 -999.990 -999.990 1.611 ..P WKT 2010 09 05 05 29 55 31.3200 -97.3300 251.000 457.0 160.634 3.810 -999.990 -999.990 1.606 ..P WKT 2010 09 05 05 39 55 31.3200 -97.3300 251.000 30.0 156.759 3.540 -999.990 -999.990 1.568 ..P WKT 2010 09 05 05 44 55 31.3200 -97.3300 251.000 122.0 168.221 3.860 -999.990 -999.990 1.682 ..P WKT 2010 09 05 05 49 55 31.3200 -97.3300 251.000 457.0 159.650 3.710 -999.990 -999.990 1.597 ..P WKT 2010 09 05 05 54 55 31.3200 -97.3300 251.000 30.0 158.576 4.060 -999.990 -999.990 1.586 ..P WKT 2010 09 05 05 59 55 31.3200 -97.3300 251.000 122.0 204.362 5.440 -999.990 -999.990 2.044 ..P WKT 2010 09 05 06 04 55 31.3200 -97.3300 251.000 457.0 172.090 3.400 -999.990 -999.990 1.721 ..P WKT 2010 09 05 06 14 55 31.3200 -97.3300 251.000 30.0 156.961 3.480 -999.990 -999.990 1.570 ..P WKT 2010 09 05 06 19 55 31.3200 -97.3300 251.000 122.0 184.987 3.580 -999.990 -999.990 1.850 ..P WKT 2010 09 05 06 24 55 31.3200 -97.3300 251.000 457.0 178.016 4.020 -999.990 -999.990 1.780 ..P WKT 2010 09 05 06 29 55 31.3200 -97.3300 251.000 30.0 160.973 3.480 -999.990 -999.990 1.610 ..P WKT 2010 09 05 06 34 55 31.3200 -97.3300 251.000 122.0 181.775 3.220 -999.990 -999.990 1.818 ..P WKT 2010 09 05 06 39 55 31.3200 -97.3300 251.000 457.0 188.144 2.850 -999.990 -999.990 1.881 ..P WKT 2010 09 05 06 49 55 31.3200 -97.3300 251.000 30.0 164.200 2.600 -999.990 -999.990 1.642 ..P WKT 2010 09 05 06 54 55 31.3200 -97.3300 251.000 122.0 185.729 2.570 -999.990 -999.990 1.857 ..P WKT 2010 09 05 06 59 55 31.3200 -97.3300 251.000 457.0 193.923 3.150 -999.990 -999.990 1.939 ..P WKT 2010 09 05 07 04 55 31.3200 -97.3300 251.000 30.0 169.741 3.970 -999.990 -999.990 1.697 ..P WKT 2010 09 05 07 09 55 31.3200 -97.3300 251.000 122.0 185.007 5.080 -999.990 -999.990 1.850 ..P WKT 2010 09 05 07 14 55 31.3200 -97.3300 251.000 457.0 199.997 2.870 -999.990 -999.990 2.000 ..P WKT 2010 09 05 07 24 55 31.3200 -97.3300 251.000 30.0 170.145 3.080 -999.990 -999.990 1.701 ..P WKT 2010 09 05 07 29 55 31.3200 -97.3300 251.000 122.0 180.509 3.660 -999.990 -999.990 1.805 ..P WKT 2010 09 05 07 34 55 31.3200 -97.3300 251.000 457.0 200.114 3.700 -999.990 -999.990 2.001 ..P WKT 2010 09 05 07 39 55 31.3200 -97.3300 251.000 30.0 166.166 3.310 -999.990 -999.990 1.662 ..P WKT 2010 09 05 07 44 55 31.3200 -97.3300 251.000 122.0 164.568 3.660 -999.990 -999.990 1.646 ..P WKT 2010 09 05 07 49 55 31.3200 -97.3300 251.000 457.0 192.593 3.780 -999.990 -999.990 1.926 ..P WKT 2010 09 05 07 59 55 31.3200 -97.3300 251.000 30.0 173.945 4.050 -999.990 -999.990 1.739 ..P WKT 2010 09 05 08 04 55 31.3200 -97.3300 251.000 122.0 178.092 3.190 -999.990 -999.990 1.781 ..P WKT 2010 09 05 08 09 55 31.3200 -97.3300 251.000 457.0 189.299 3.220 -999.990 -999.990 1.893 ..P WKT 2010 09 05 08 14 55 31.3200 -97.3300 251.000 30.0 174.159 3.140 -999.990 -999.990 1.742 ..P WKT 2010 09 05 08 19 55 31.3200 -97.3300 251.000 122.0 175.860 3.890 -999.990 -999.990 1.759 ..P WKT 2010 09 05 08 24 55 31.3200 -97.3300 251.000 457.0 196.839 3.140 -999.990 -999.990 1.968 ..P WKT 2010 09 05 08 34 55 31.3200 -97.3300 251.000 30.0 179.485 3.300 -999.990 -999.990 1.795 ..P WKT 2010 09 05 08 39 55 31.3200 -97.3300 251.000 122.0 189.211 3.730 -999.990 -999.990 1.892 ..P WKT 2010 09 05 08 44 55 31.3200 -97.3300 251.000 457.0 191.471 2.750 -999.990 -999.990 1.915 ..P WKT 2010 09 05 08 49 55 31.3200 -97.3300 251.000 30.0 183.282 4.240 -999.990 -999.990 1.833 ..P WKT 2010 09 05 08 54 55 31.3200 -97.3300 251.000 122.0 176.317 3.180 -999.990 -999.990 1.763 ..P WKT 2010 09 05 08 59 55 31.3200 -97.3300 251.000 457.0 196.891 3.180 -999.990 -999.990 1.969 ..P WKT 2010 09 05 09 09 55 31.3200 -97.3300 251.000 30.0 184.841 3.870 -999.990 -999.990 1.848 ..P WKT 2010 09 05 09 14 55 31.3200 -97.3300 251.000 122.0 169.451 3.210 -999.990 -999.990 1.695 ..P WKT 2010 09 05 09 19 55 31.3200 -97.3300 251.000 457.0 181.862 3.250 -999.990 -999.990 1.819 ..P WKT 2010 09 05 09 24 55 31.3200 -97.3300 251.000 30.0 178.813 4.350 -999.990 -999.990 1.788 ..P WKT 2010 09 05 09 29 55 31.3200 -97.3300 251.000 122.0 171.970 3.320 -999.990 -999.990 1.720 ..P WKT 2010 09 05 09 34 55 31.3200 -97.3300 251.000 457.0 162.959 2.670 -999.990 -999.990 1.630 ..P WKT 2010 09 05 09 44 55 31.3200 -97.3300 251.000 30.0 178.302 2.710 -999.990 -999.990 1.783 ..P WKT 2010 09 05 09 49 55 31.3200 -97.3300 251.000 122.0 173.378 4.200 -999.990 -999.990 1.734 ..P WKT 2010 09 05 09 54 55 31.3200 -97.3300 251.000 457.0 174.146 3.930 -999.990 -999.990 1.741 ..P WKT 2010 09 05 09 59 55 31.3200 -97.3300 251.000 30.0 174.235 3.110 -999.990 -999.990 1.742 ..P WKT 2010 09 05 10 04 55 31.3200 -97.3300 251.000 122.0 178.525 2.400 -999.990 -999.990 1.785 ..P WKT 2010 09 05 10 09 55 31.3200 -97.3300 251.000 457.0 164.123 2.540 -999.990 -999.990 1.641 ..P WKT 2010 09 05 10 19 55 31.3200 -97.3300 251.000 30.0 179.607 3.980 -999.990 -999.990 1.796 ..P WKT 2010 09 05 10 24 55 31.3200 -97.3300 251.000 122.0 175.229 3.620 -999.990 -999.990 1.752 ..P WKT 2010 09 05 10 29 55 31.3200 -97.3300 251.000 457.0 186.014 5.180 -999.990 -999.990 1.860 ..P WKT 2010 09 05 10 34 55 31.3200 -97.3300 251.000 30.0 175.138 3.070 -999.990 -999.990 1.751 ..P WKT 2010 09 05 10 39 55 31.3200 -97.3300 251.000 122.0 172.657 3.070 -999.990 -999.990 1.727 ..P WKT 2010 09 05 10 44 55 31.3200 -97.3300 251.000 457.0 175.859 2.850 -999.990 -999.990 1.759 ..P WKT 2010 09 05 10 54 55 31.3200 -97.3300 251.000 30.0 178.784 4.160 -999.990 -999.990 1.788 ..P WKT 2010 09 05 10 59 55 31.3200 -97.3300 251.000 122.0 161.732 2.870 -999.990 -999.990 1.617 ..P WKT 2010 09 05 11 04 55 31.3200 -97.3300 251.000 457.0 160.374 3.110 -999.990 -999.990 1.604 ..P WKT 2010 09 05 11 09 55 31.3200 -97.3300 251.000 30.0 176.599 3.450 -999.990 -999.990 1.766 ..P WKT 2010 09 05 11 14 55 31.3200 -97.3300 251.000 122.0 167.396 3.280 -999.990 -999.990 1.674 ..P WKT 2010 09 05 11 19 55 31.3200 -97.3300 251.000 457.0 158.736 3.200 -999.990 -999.990 1.587 ..P WKT 2010 09 05 11 29 55 31.3200 -97.3300 251.000 30.0 173.598 3.650 -999.990 -999.990 1.736 ..P WKT 2010 09 05 11 34 55 31.3200 -97.3300 251.000 122.0 166.563 3.470 -999.990 -999.990 1.666 ..P WKT 2010 09 05 11 39 55 31.3200 -97.3300 251.000 457.0 165.475 3.810 -999.990 -999.990 1.655 ..P WKT 2010 09 05 11 44 55 31.3200 -97.3300 251.000 30.0 174.389 3.080 -999.990 -999.990 1.744 ..P WKT 2010 09 05 11 49 55 31.3200 -97.3300 251.000 122.0 165.735 3.080 -999.990 -999.990 1.657 ..P WKT 2010 09 05 12 09 55 31.3200 -97.3300 251.000 457.0 150.023 3.520 -999.990 -999.990 1.500 ..P WKT 2010 09 05 12 10 25 31.3200 -97.3300 251.000 457.0 151.129 3.410 -999.990 -999.990 1.511 ..P WKT 2010 09 05 12 10 55 31.3200 -97.3300 251.000 457.0 153.317 3.190 -999.990 -999.990 1.533 ..P WKT 2010 09 05 12 11 25 31.3200 -97.3300 251.000 457.0 150.640 2.740 -999.990 -999.990 1.506 ..P WKT 2010 09 05 12 11 55 31.3200 -97.3300 251.000 457.0 154.179 3.160 -999.990 -999.990 1.542 ..P WKT 2010 09 05 12 12 25 31.3200 -97.3300 251.000 457.0 158.529 2.980 -999.990 -999.990 1.585 ..P WKT 2010 09 05 12 12 55 31.3200 -97.3300 251.000 457.0 153.690 2.940 -999.990 -999.990 1.537 ..P WKT 2010 09 05 12 13 25 31.3200 -97.3300 251.000 457.0 158.310 3.150 -999.990 -999.990 1.583 ..P WKT 2010 09 05 12 13 55 31.3200 -97.3300 251.000 457.0 158.336 3.130 -999.990 -999.990 1.583 ..P WKT 2010 09 05 12 14 25 31.3200 -97.3300 251.000 457.0 159.983 3.880 -999.990 -999.990 1.600 ..P WKT 2010 09 05 12 14 55 31.3200 -97.3300 251.000 457.0 160.550 3.470 -999.990 -999.990 1.606 ..P WKT 2010 09 05 12 19 55 31.3200 -97.3300 251.000 30.0 168.917 2.510 -999.990 -999.990 1.689 ..P WKT 2010 09 05 12 24 55 31.3200 -97.3300 251.000 122.0 162.821 2.320 -999.990 -999.990 1.628 ..P WKT 2010 09 05 12 29 55 31.3200 -97.3300 251.000 457.0 157.941 2.320 -999.990 -999.990 1.579 ..P WKT 2010 09 05 12 34 55 31.3200 -97.3300 251.000 30.0 171.177 2.150 -999.990 -999.990 1.712 ..P WKT 2010 09 05 12 39 55 31.3200 -97.3300 251.000 122.0 168.461 2.490 -999.990 -999.990 1.685 ..P WKT 2010 09 05 12 44 55 31.3200 -97.3300 251.000 457.0 152.220 2.410 -999.990 -999.990 1.522 ..P WKT 2010 09 05 12 54 55 31.3200 -97.3300 251.000 30.0 174.486 2.220 -999.990 -999.990 1.745 ..P WKT 2010 09 05 12 59 55 31.3200 -97.3300 251.000 122.0 169.040 5.340 -999.990 -999.990 1.690 ..P WKT 2010 09 05 13 04 55 31.3200 -97.3300 251.000 457.0 161.563 1.990 -999.990 -999.990 1.616 ..P WKT 2010 09 05 13 09 55 31.3200 -97.3300 251.000 30.0 176.275 2.500 -999.990 -999.990 1.763 ..P WKT 2010 09 05 13 14 55 31.3200 -97.3300 251.000 122.0 175.292 2.430 -999.990 -999.990 1.753 ..P WKT 2010 09 05 13 19 55 31.3200 -97.3300 251.000 457.0 166.460 2.240 -999.990 -999.990 1.665 ..P WKT 2010 09 05 13 29 55 31.3200 -97.3300 251.000 30.0 172.865 3.120 -999.990 -999.990 1.729 ..P WKT 2010 09 05 13 34 55 31.3200 -97.3300 251.000 122.0 171.051 3.460 -999.990 -999.990 1.711 ..P WKT 2010 09 05 13 39 55 31.3200 -97.3300 251.000 457.0 168.829 3.140 -999.990 -999.990 1.688 ..P WKT 2010 09 05 13 44 55 31.3200 -97.3300 251.000 30.0 174.732 3.830 -999.990 -999.990 1.747 ..P WKT 2010 09 05 13 49 55 31.3200 -97.3300 251.000 122.0 171.562 3.910 -999.990 -999.990 1.716 ..P WKT 2010 09 05 13 54 55 31.3200 -97.3300 251.000 457.0 172.591 4.350 -999.990 -999.990 1.726 ..P WKT 2010 09 05 14 04 55 31.3200 -97.3300 251.000 30.0 163.133 4.440 -999.990 -999.990 1.631 ..P WKT 2010 09 05 14 09 55 31.3200 -97.3300 251.000 122.0 169.851 3.590 -999.990 -999.990 1.699 ..P WKT 2010 09 05 14 14 55 31.3200 -97.3300 251.000 457.0 169.389 4.660 -999.990 -999.990 1.694 ..P WKT 2010 09 05 14 19 55 31.3200 -97.3300 251.000 30.0 166.488 3.900 -999.990 -999.990 1.665 ..P WKT 2010 09 05 14 24 55 31.3200 -97.3300 251.000 122.0 161.553 3.700 -999.990 -999.990 1.616 ..P WKT 2010 09 05 14 29 55 31.3200 -97.3300 251.000 457.0 248.920 12.350 -999.990 -999.990 2.489 ..P WKT 2010 09 05 14 39 55 31.3200 -97.3300 251.000 30.0 159.892 3.630 -999.990 -999.990 1.599 ..P WKT 2010 09 05 14 44 55 31.3200 -97.3300 251.000 122.0 167.293 3.360 -999.990 -999.990 1.673 ..P WKT 2010 09 05 14 49 55 31.3200 -97.3300 251.000 457.0 181.476 4.230 -999.990 -999.990 1.815 ..P WKT 2010 09 05 14 54 55 31.3200 -97.3300 251.000 30.0 168.267 4.140 -999.990 -999.990 1.683 ..P WKT 2010 09 05 14 59 55 31.3200 -97.3300 251.000 122.0 174.857 5.180 -999.990 -999.990 1.749 ..P WKT 2010 09 05 15 04 55 31.3200 -97.3300 251.000 457.0 183.077 3.280 -999.990 -999.990 1.831 ..P WKT 2010 09 05 15 14 55 31.3200 -97.3300 251.000 30.0 173.821 2.540 -999.990 -999.990 1.738 ..P WKT 2010 09 05 15 19 55 31.3200 -97.3300 251.000 122.0 181.577 5.290 -999.990 -999.990 1.816 ..P WKT 2010 09 05 15 24 55 31.3200 -97.3300 251.000 457.0 187.165 4.820 -999.990 -999.990 1.872 ..P WKT 2010 09 05 15 29 55 31.3200 -97.3300 251.000 30.0 178.909 4.070 -999.990 -999.990 1.789 ..P WKT 2010 09 05 15 34 55 31.3200 -97.3300 251.000 122.0 193.456 2.560 -999.990 -999.990 1.935 ..P WKT 2010 09 05 15 39 55 31.3200 -97.3300 251.000 457.0 181.128 2.490 -999.990 -999.990 1.811 ..P WKT 2010 09 05 15 49 55 31.3200 -97.3300 251.000 30.0 175.841 2.930 -999.990 -999.990 1.758 ..P WKT 2010 09 05 15 54 55 31.3200 -97.3300 251.000 122.0 179.627 2.710 -999.990 -999.990 1.796 ..P WKT 2010 09 05 15 59 55 31.3200 -97.3300 251.000 457.0 177.438 3.640 -999.990 -999.990 1.774 ..P WKT 2010 09 05 16 04 55 31.3200 -97.3300 251.000 30.0 179.323 2.860 -999.990 -999.990 1.793 ..P WKT 2010 09 05 16 09 55 31.3200 -97.3300 251.000 122.0 174.418 2.870 -999.990 -999.990 1.744 ..P WKT 2010 09 05 16 14 55 31.3200 -97.3300 251.000 457.0 176.575 4.810 -999.990 -999.990 1.766 ..P WKT 2010 09 05 16 24 55 31.3200 -97.3300 251.000 30.0 169.691 3.770 -999.990 -999.990 1.697 ..P WKT 2010 09 05 16 29 55 31.3200 -97.3300 251.000 122.0 175.867 3.810 -999.990 -999.990 1.759 ..P WKT 2010 09 05 16 34 55 31.3200 -97.3300 251.000 457.0 163.969 2.730 -999.990 -999.990 1.640 ..P WKT 2010 09 05 16 39 55 31.3200 -97.3300 251.000 30.0 166.204 4.480 -999.990 -999.990 1.662 ..P WKT 2010 09 05 16 44 55 31.3200 -97.3300 251.000 122.0 172.518 2.830 -999.990 -999.990 1.725 ..P WKT 2010 09 05 16 49 55 31.3200 -97.3300 251.000 457.0 174.211 2.750 -999.990 -999.990 1.742 ..P WKT 2010 09 05 17 04 55 31.3200 -97.3300 251.000 30.0 163.365 3.730 -999.990 -999.990 1.634 ..P WKT 2010 09 05 17 09 55 31.3200 -97.3300 251.000 122.0 169.674 3.220 -999.990 -999.990 1.697 ..P WKT 2010 09 05 17 14 55 31.3200 -97.3300 251.000 457.0 152.860 4.860 -999.990 -999.990 1.529 ..P WKT 2010 09 05 17 19 55 31.3200 -97.3300 251.000 30.0 159.035 3.240 -999.990 -999.990 1.590 ..P WKT 2010 09 05 17 24 55 31.3200 -97.3300 251.000 122.0 166.297 2.800 -999.990 -999.990 1.663 ..P WKT 2010 09 05 17 29 55 31.3200 -97.3300 251.000 457.0 165.807 3.000 -999.990 -999.990 1.658 ..P WKT 2010 09 05 17 39 55 31.3200 -97.3300 251.000 30.0 168.370 3.430 -999.990 -999.990 1.684 ..P WKT 2010 09 05 17 44 55 31.3200 -97.3300 251.000 122.0 177.823 3.360 -999.990 -999.990 1.778 ..P WKT 2010 09 05 17 49 55 31.3200 -97.3300 251.000 457.0 169.308 3.960 -999.990 -999.990 1.693 ..P WKT 2010 09 05 17 54 55 31.3200 -97.3300 251.000 30.0 164.060 3.220 -999.990 -999.990 1.641 ..P WKT 2010 09 05 17 59 55 31.3200 -97.3300 251.000 122.0 174.605 3.930 -999.990 -999.990 1.746 ..P WKT 2010 09 05 18 04 55 31.3200 -97.3300 251.000 457.0 163.772 3.140 -999.990 -999.990 1.638 ..P WKT 2010 09 05 18 14 55 31.3200 -97.3300 251.000 30.0 160.917 3.370 -999.990 -999.990 1.609 ..P WKT 2010 09 05 18 19 55 31.3200 -97.3300 251.000 122.0 164.810 3.740 -999.990 -999.990 1.648 ..P WKT 2010 09 05 18 24 55 31.3200 -97.3300 251.000 457.0 169.658 4.080 -999.990 -999.990 1.697 ..P WKT 2010 09 05 18 29 55 31.3200 -97.3300 251.000 30.0 157.886 3.150 -999.990 -999.990 1.579 ..P WKT 2010 09 05 18 34 55 31.3200 -97.3300 251.000 122.0 161.644 3.780 -999.990 -999.990 1.616 ..P WKT 2010 09 05 18 39 55 31.3200 -97.3300 251.000 457.0 158.044 2.420 -999.990 -999.990 1.580 ..P WKT 2010 09 05 18 49 55 31.3200 -97.3300 251.000 30.0 161.610 2.540 -999.990 -999.990 1.616 ..P WKT 2010 09 05 18 54 55 31.3200 -97.3300 251.000 122.0 166.052 3.850 -999.990 -999.990 1.661 ..P WKT 2010 09 05 18 59 55 31.3200 -97.3300 251.000 457.0 156.043 3.240 -999.990 -999.990 1.560 ..P WKT 2010 09 05 19 04 55 31.3200 -97.3300 251.000 30.0 155.850 4.270 -999.990 -999.990 1.558 ..P WKT 2010 09 05 19 09 55 31.3200 -97.3300 251.000 122.0 155.383 3.480 -999.990 -999.990 1.554 ..P WKT 2010 09 05 19 14 55 31.3200 -97.3300 251.000 457.0 154.372 3.740 -999.990 -999.990 1.544 ..P WKT 2010 09 05 19 24 55 31.3200 -97.3300 251.000 30.0 155.231 4.220 -999.990 -999.990 1.552 ..P WKT 2010 09 05 19 29 55 31.3200 -97.3300 251.000 122.0 165.016 3.730 -999.990 -999.990 1.650 ..P WKT 2010 09 05 19 34 55 31.3200 -97.3300 251.000 457.0 157.611 3.430 -999.990 -999.990 1.576 ..P WKT 2010 09 05 19 39 55 31.3200 -97.3300 251.000 30.0 152.116 2.910 -999.990 -999.990 1.521 ..P WKT 2010 09 05 19 44 55 31.3200 -97.3300 251.000 122.0 150.440 2.890 -999.990 -999.990 1.504 ..P WKT 2010 09 05 19 49 55 31.3200 -97.3300 251.000 457.0 152.313 2.820 -999.990 -999.990 1.523 ..P WKT 2010 09 05 19 59 55 31.3200 -97.3300 251.000 30.0 150.696 2.380 -999.990 -999.990 1.507 ..P WKT 2010 09 05 20 04 55 31.3200 -97.3300 251.000 122.0 154.578 2.700 -999.990 -999.990 1.546 ..P WKT 2010 09 05 20 09 55 31.3200 -97.3300 251.000 457.0 150.268 2.420 -999.990 -999.990 1.503 ..P WKT 2010 09 05 20 14 55 31.3200 -97.3300 251.000 30.0 148.962 2.460 -999.990 -999.990 1.490 ..P WKT 2010 09 05 20 19 55 31.3200 -97.3300 251.000 122.0 159.263 2.930 -999.990 -999.990 1.593 ..P WKT 2010 09 05 20 24 55 31.3200 -97.3300 251.000 457.0 154.542 2.600 -999.990 -999.990 1.545 ..P WKT 2010 09 05 20 34 55 31.3200 -97.3300 251.000 30.0 149.217 2.920 -999.990 -999.990 1.492 ..P WKT 2010 09 05 20 39 55 31.3200 -97.3300 251.000 122.0 151.618 2.830 -999.990 -999.990 1.516 ..P WKT 2010 09 05 20 44 55 31.3200 -97.3300 251.000 457.0 151.560 3.010 -999.990 -999.990 1.516 ..P WKT 2010 09 05 20 49 55 31.3200 -97.3300 251.000 30.0 146.309 3.230 -999.990 -999.990 1.463 ..P WKT 2010 09 05 20 54 55 31.3200 -97.3300 251.000 122.0 154.587 2.800 -999.990 -999.990 1.546 ..P WKT 2010 09 05 20 59 55 31.3200 -97.3300 251.000 457.0 149.200 2.640 -999.990 -999.990 1.492 ..P WKT 2010 09 05 21 09 55 31.3200 -97.3300 251.000 30.0 140.568 2.730 -999.990 -999.990 1.406 ..P WKT 2010 09 05 21 14 55 31.3200 -97.3300 251.000 122.0 153.049 3.620 -999.990 -999.990 1.530 ..P WKT 2010 09 05 21 19 55 31.3200 -97.3300 251.000 457.0 146.526 4.230 -999.990 -999.990 1.465 ..P WKT 2010 09 05 21 24 55 31.3200 -97.3300 251.000 30.0 149.300 3.250 -999.990 -999.990 1.493 ..P WKT 2010 09 05 21 29 55 31.3200 -97.3300 251.000 122.0 152.895 2.650 -999.990 -999.990 1.529 ..P WKT 2010 09 05 21 34 55 31.3200 -97.3300 251.000 457.0 148.558 2.630 -999.990 -999.990 1.486 ..P WKT 2010 09 05 21 44 55 31.3200 -97.3300 251.000 30.0 145.529 2.800 -999.990 -999.990 1.455 ..P WKT 2010 09 05 21 49 55 31.3200 -97.3300 251.000 122.0 153.544 2.620 -999.990 -999.990 1.535 ..P WKT 2010 09 05 21 54 55 31.3200 -97.3300 251.000 457.0 147.465 3.830 -999.990 -999.990 1.475 ..P WKT 2010 09 05 21 59 55 31.3200 -97.3300 251.000 30.0 142.754 3.880 -999.990 -999.990 1.428 ..P WKT 2010 09 05 22 04 55 31.3200 -97.3300 251.000 122.0 151.181 3.720 -999.990 -999.990 1.512 ..P WKT 2010 09 05 22 09 55 31.3200 -97.3300 251.000 457.0 150.439 2.770 -999.990 -999.990 1.504 ..P WKT 2010 09 05 22 19 55 31.3200 -97.3300 251.000 30.0 149.834 3.370 -999.990 -999.990 1.498 ..P WKT 2010 09 05 22 24 55 31.3200 -97.3300 251.000 122.0 154.216 3.350 -999.990 -999.990 1.542 ..P WKT 2010 09 05 22 29 55 31.3200 -97.3300 251.000 457.0 146.821 3.430 -999.990 -999.990 1.468 ..P WKT 2010 09 05 22 34 55 31.3200 -97.3300 251.000 30.0 141.343 3.200 -999.990 -999.990 1.413 ..P WKT 2010 09 05 22 39 55 31.3200 -97.3300 251.000 122.0 153.397 2.810 -999.990 -999.990 1.534 ..P WKT 2010 09 05 22 44 55 31.3200 -97.3300 251.000 457.0 144.631 2.880 -999.990 -999.990 1.446 ..P WKT 2010 09 05 22 54 55 31.3200 -97.3300 251.000 30.0 147.175 3.300 -999.990 -999.990 1.472 ..P WKT 2010 09 05 22 59 55 31.3200 -97.3300 251.000 122.0 144.787 2.990 -999.990 -999.990 1.448 ..P WKT 2010 09 05 23 04 55 31.3200 -97.3300 251.000 457.0 139.109 4.230 -999.990 -999.990 1.391 ..P WKT 2010 09 05 23 09 55 31.3200 -97.3300 251.000 30.0 144.669 3.160 -999.990 -999.990 1.447 ..P WKT 2010 09 05 23 14 55 31.3200 -97.3300 251.000 122.0 148.860 3.180 -999.990 -999.990 1.489 ..P WKT 2010 09 05 23 19 55 31.3200 -97.3300 251.000 457.0 142.084 3.560 -999.990 -999.990 1.421 ..P WKT 2010 09 05 23 29 55 31.3200 -97.3300 251.000 30.0 146.652 3.090 -999.990 -999.990 1.467 ..P WKT 2010 09 05 23 34 55 31.3200 -97.3300 251.000 122.0 149.773 3.290 -999.990 -999.990 1.498 ..P WKT 2010 09 05 23 39 55 31.3200 -97.3300 251.000 457.0 142.196 4.830 -999.990 -999.990 1.422 ..P WKT 2010 09 05 23 44 55 31.3200 -97.3300 251.000 30.0 142.572 3.570 -999.990 -999.990 1.426 ..P WKT 2010 09 05 23 49 55 31.3200 -97.3300 251.000 122.0 155.021 3.290 -999.990 -999.990 1.550 ..P WKT 2010 09 06 00 09 55 31.3200 -97.3300 251.000 457.0 146.865 3.300 -999.990 -999.990 1.469 ..P WKT 2010 09 06 00 10 25 31.3200 -97.3300 251.000 457.0 148.733 2.950 -999.990 -999.990 1.487 ..P WKT 2010 09 06 00 10 55 31.3200 -97.3300 251.000 457.0 147.582 3.500 -999.990 -999.990 1.476 ..P WKT 2010 09 06 00 11 25 31.3200 -97.3300 251.000 457.0 147.116 3.220 -999.990 -999.990 1.471 ..P WKT 2010 09 06 00 11 55 31.3200 -97.3300 251.000 457.0 146.789 3.370 -999.990 -999.990 1.468 ..P WKT 2010 09 06 00 12 25 31.3200 -97.3300 251.000 457.0 141.657 3.790 -999.990 -999.990 1.417 ..P WKT 2010 09 06 00 12 55 31.3200 -97.3300 251.000 457.0 141.055 3.380 -999.990 -999.990 1.411 ..P WKT 2010 09 06 00 13 25 31.3200 -97.3300 251.000 457.0 139.766 3.260 -999.990 -999.990 1.398 ..P WKT 2010 09 06 00 13 55 31.3200 -97.3300 251.000 457.0 140.948 3.100 -999.990 -999.990 1.409 ..P WKT 2010 09 06 00 14 25 31.3200 -97.3300 251.000 457.0 144.051 3.920 -999.990 -999.990 1.441 ..P WKT 2010 09 06 00 14 55 31.3200 -97.3300 251.000 457.0 144.683 4.030 -999.990 -999.990 1.447 ..P WKT 2010 09 06 00 19 55 31.3200 -97.3300 251.000 30.0 142.089 3.540 -999.990 -999.990 1.421 ..P WKT 2010 09 06 00 24 55 31.3200 -97.3300 251.000 122.0 143.200 3.400 -999.990 -999.990 1.432 ..P WKT 2010 09 06 00 29 55 31.3200 -97.3300 251.000 457.0 141.566 3.880 -999.990 -999.990 1.416 ..P WKT 2010 09 06 00 34 55 31.3200 -97.3300 251.000 30.0 137.049 3.620 -999.990 -999.990 1.370 ..P WKT 2010 09 06 00 39 55 31.3200 -97.3300 251.000 122.0 147.771 3.120 -999.990 -999.990 1.478 ..P WKT 2010 09 06 00 44 55 31.3200 -97.3300 251.000 457.0 138.723 3.200 -999.990 -999.990 1.387 ..P WKT 2010 09 06 00 54 55 31.3200 -97.3300 251.000 30.0 143.418 3.450 -999.990 -999.990 1.434 ..P WKT 2010 09 06 00 59 55 31.3200 -97.3300 251.000 122.0 147.690 3.620 -999.990 -999.990 1.477 ..P WKT 2010 09 06 01 04 55 31.3200 -97.3300 251.000 457.0 145.506 3.970 -999.990 -999.990 1.455 ..P WKT 2010 09 06 01 09 55 31.3200 -97.3300 251.000 30.0 143.459 4.330 -999.990 -999.990 1.435 ..P WKT 2010 09 06 01 14 55 31.3200 -97.3300 251.000 122.0 140.038 4.750 -999.990 -999.990 1.400 ..P WKT 2010 09 06 01 19 55 31.3200 -97.3300 251.000 457.0 142.799 5.030 -999.990 -999.990 1.428 ..P WKT 2010 09 06 01 29 55 31.3200 -97.3300 251.000 30.0 144.141 5.050 -999.990 -999.990 1.441 ..P WKT 2010 09 06 01 34 55 31.3200 -97.3300 251.000 122.0 151.243 4.560 -999.990 -999.990 1.512 ..P WKT 2010 09 06 01 39 55 31.3200 -97.3300 251.000 457.0 143.225 4.920 -999.990 -999.990 1.432 ..P WKT 2010 09 06 01 44 55 31.3200 -97.3300 251.000 30.0 143.317 6.270 -999.990 -999.990 1.433 ..P WKT 2010 09 06 01 49 55 31.3200 -97.3300 251.000 122.0 147.396 5.560 -999.990 -999.990 1.474 ..P WKT 2010 09 06 01 54 55 31.3200 -97.3300 251.000 457.0 147.351 4.170 -999.990 -999.990 1.474 ..P WKT 2010 09 06 02 04 55 31.3200 -97.3300 251.000 30.0 141.328 3.900 -999.990 -999.990 1.413 ..P WKT 2010 09 06 02 09 55 31.3200 -97.3300 251.000 122.0 150.614 5.950 -999.990 -999.990 1.506 ..P WKT 2010 09 06 02 14 55 31.3200 -97.3300 251.000 457.0 140.922 6.920 -999.990 -999.990 1.409 ..P WKT 2010 09 06 02 19 55 31.3200 -97.3300 251.000 30.0 142.507 5.250 -999.990 -999.990 1.425 ..P WKT 2010 09 06 02 24 55 31.3200 -97.3300 251.000 122.0 141.342 4.700 -999.990 -999.990 1.413 ..P WKT 2010 09 06 02 29 55 31.3200 -97.3300 251.000 457.0 135.498 4.260 -999.990 -999.990 1.355 ..P WKT 2010 09 06 02 39 55 31.3200 -97.3300 251.000 30.0 144.016 2.930 -999.990 -999.990 1.440 ..P WKT 2010 09 06 02 44 55 31.3200 -97.3300 251.000 122.0 138.013 3.670 -999.990 -999.990 1.380 ..P WKT 2010 09 06 02 49 55 31.3200 -97.3300 251.000 457.0 139.442 3.860 -999.990 -999.990 1.394 ..P WKT 2010 09 06 02 54 55 31.3200 -97.3300 251.000 30.0 136.191 4.430 -999.990 -999.990 1.362 ..P WKT 2010 09 06 02 59 55 31.3200 -97.3300 251.000 122.0 138.721 2.990 -999.990 -999.990 1.387 ..P WKT 2010 09 06 03 04 55 31.3200 -97.3300 251.000 457.0 136.295 2.890 -999.990 -999.990 1.363 ..P WKT 2010 09 06 03 14 55 31.3200 -97.3300 251.000 30.0 140.491 2.890 -999.990 -999.990 1.405 ..P WKT 2010 09 06 03 19 55 31.3200 -97.3300 251.000 122.0 151.796 3.080 -999.990 -999.990 1.518 ..P WKT 2010 09 06 03 24 55 31.3200 -97.3300 251.000 457.0 153.462 3.150 -999.990 -999.990 1.535 ..P WKT 2010 09 06 03 29 55 31.3200 -97.3300 251.000 30.0 143.010 5.140 -999.990 -999.990 1.430 ..P WKT 2010 09 06 03 34 55 31.3200 -97.3300 251.000 122.0 153.491 2.980 -999.990 -999.990 1.535 ..P WKT 2010 09 06 03 39 55 31.3200 -97.3300 251.000 457.0 155.985 3.130 -999.990 -999.990 1.560 ..P WKT 2010 09 06 03 49 55 31.3200 -97.3300 251.000 30.0 147.275 3.550 -999.990 -999.990 1.473 ..P WKT 2010 09 06 03 54 55 31.3200 -97.3300 251.000 122.0 157.289 4.020 -999.990 -999.990 1.573 ..P WKT 2010 09 06 03 59 55 31.3200 -97.3300 251.000 457.0 170.611 3.300 -999.990 -999.990 1.706 ..P WKT 2010 09 06 04 04 55 31.3200 -97.3300 251.000 30.0 145.624 3.610 -999.990 -999.990 1.456 ..P WKT 2010 09 06 04 09 55 31.3200 -97.3300 251.000 122.0 155.915 3.900 -999.990 -999.990 1.559 ..P WKT 2010 09 06 04 14 55 31.3200 -97.3300 251.000 457.0 170.619 4.010 -999.990 -999.990 1.706 ..P WKT 2010 09 06 04 24 55 31.3200 -97.3300 251.000 30.0 146.801 5.230 -999.990 -999.990 1.468 ..P WKT 2010 09 06 04 29 55 31.3200 -97.3300 251.000 122.0 163.419 3.730 -999.990 -999.990 1.634 ..P WKT 2010 09 06 04 34 55 31.3200 -97.3300 251.000 457.0 173.283 3.550 -999.990 -999.990 1.733 ..P WKT 2010 09 06 04 39 55 31.3200 -97.3300 251.000 30.0 159.844 3.100 -999.990 -999.990 1.598 ..P WKT 2010 09 06 04 44 55 31.3200 -97.3300 251.000 122.0 173.572 3.600 -999.990 -999.990 1.736 ..P WKT 2010 09 06 04 49 55 31.3200 -97.3300 251.000 457.0 170.612 3.670 -999.990 -999.990 1.706 ..P WKT 2010 09 06 05 04 55 31.3200 -97.3300 251.000 30.0 156.509 3.770 -999.990 -999.990 1.565 ..P WKT 2010 09 06 05 09 55 31.3200 -97.3300 251.000 122.0 175.564 3.270 -999.990 -999.990 1.756 ..P WKT 2010 09 06 05 14 55 31.3200 -97.3300 251.000 457.0 166.611 3.110 -999.990 -999.990 1.666 ..P WKT 2010 09 06 05 19 55 31.3200 -97.3300 251.000 30.0 167.041 4.160 -999.990 -999.990 1.670 ..P WKT 2010 09 06 05 24 55 31.3200 -97.3300 251.000 122.0 182.790 3.250 -999.990 -999.990 1.828 ..P WKT 2010 09 06 05 29 55 31.3200 -97.3300 251.000 457.0 176.320 3.550 -999.990 -999.990 1.763 ..P WKT 2010 09 06 05 39 55 31.3200 -97.3300 251.000 30.0 163.159 3.420 -999.990 -999.990 1.632 ..P WKT 2010 09 06 05 44 55 31.3200 -97.3300 251.000 122.0 178.558 3.300 -999.990 -999.990 1.786 ..P WKT 2010 09 06 05 49 55 31.3200 -97.3300 251.000 457.0 176.978 3.180 -999.990 -999.990 1.770 ..P WKT 2010 09 06 05 54 55 31.3200 -97.3300 251.000 30.0 168.354 4.050 -999.990 -999.990 1.684 ..P WKT 2010 09 06 05 59 55 31.3200 -97.3300 251.000 122.0 173.400 3.820 -999.990 -999.990 1.734 ..P WKT 2010 09 06 06 04 55 31.3200 -97.3300 251.000 457.0 174.581 3.570 -999.990 -999.990 1.746 ..P WKT 2010 09 06 06 14 55 31.3200 -97.3300 251.000 30.0 178.422 3.220 -999.990 -999.990 1.784 ..P WKT 2010 09 06 06 19 55 31.3200 -97.3300 251.000 122.0 180.807 3.110 -999.990 -999.990 1.808 ..P WKT 2010 09 06 06 24 55 31.3200 -97.3300 251.000 457.0 177.665 3.490 -999.990 -999.990 1.777 ..P WKT 2010 09 06 06 29 55 31.3200 -97.3300 251.000 30.0 175.076 4.680 -999.990 -999.990 1.751 ..P WKT 2010 09 06 06 34 55 31.3200 -97.3300 251.000 122.0 183.265 4.060 -999.990 -999.990 1.833 ..P WKT 2010 09 06 06 39 55 31.3200 -97.3300 251.000 457.0 176.531 3.020 -999.990 -999.990 1.765 ..P WKT 2010 09 06 06 49 55 31.3200 -97.3300 251.000 30.0 178.143 3.450 -999.990 -999.990 1.781 ..P WKT 2010 09 06 06 54 55 31.3200 -97.3300 251.000 122.0 177.094 3.460 -999.990 -999.990 1.771 ..P WKT 2010 09 06 06 59 55 31.3200 -97.3300 251.000 457.0 166.643 4.650 -999.990 -999.990 1.666 ..P WKT 2010 09 06 07 04 55 31.3200 -97.3300 251.000 30.0 175.547 3.890 -999.990 -999.990 1.755 ..P WKT 2010 09 06 07 09 55 31.3200 -97.3300 251.000 122.0 173.943 2.960 -999.990 -999.990 1.739 ..P WKT 2010 09 06 07 14 55 31.3200 -97.3300 251.000 457.0 162.937 3.110 -999.990 -999.990 1.629 ..P WKT 2010 09 06 07 24 55 31.3200 -97.3300 251.000 30.0 170.712 2.760 -999.990 -999.990 1.707 ..P WKT 2010 09 06 07 29 55 31.3200 -97.3300 251.000 122.0 173.179 3.130 -999.990 -999.990 1.732 ..P WKT 2010 09 06 07 34 55 31.3200 -97.3300 251.000 457.0 157.109 3.070 -999.990 -999.990 1.571 ..P WKT 2010 09 06 07 39 55 31.3200 -97.3300 251.000 30.0 167.045 3.770 -999.990 -999.990 1.670 ..P WKT 2010 09 06 07 44 55 31.3200 -97.3300 251.000 122.0 169.234 4.720 -999.990 -999.990 1.692 ..P WKT 2010 09 06 07 49 55 31.3200 -97.3300 251.000 457.0 148.455 3.890 -999.990 -999.990 1.485 ..P WKT 2010 09 06 07 59 55 31.3200 -97.3300 251.000 30.0 170.409 5.180 -999.990 -999.990 1.704 ..P WKT 2010 09 06 08 04 55 31.3200 -97.3300 251.000 122.0 171.493 3.890 -999.990 -999.990 1.715 ..P WKT 2010 09 06 08 09 55 31.3200 -97.3300 251.000 457.0 156.382 3.800 -999.990 -999.990 1.564 ..P WKT 2010 09 06 08 14 55 31.3200 -97.3300 251.000 30.0 165.632 3.930 -999.990 -999.990 1.656 ..P WKT 2010 09 06 08 19 55 31.3200 -97.3300 251.000 122.0 171.284 4.260 -999.990 -999.990 1.713 ..P WKT 2010 09 06 08 24 55 31.3200 -97.3300 251.000 457.0 154.646 4.240 -999.990 -999.990 1.546 ..P WKT 2010 09 06 08 34 55 31.3200 -97.3300 251.000 30.0 171.788 3.380 -999.990 -999.990 1.718 ..P WKT 2010 09 06 08 39 55 31.3200 -97.3300 251.000 122.0 169.429 3.730 -999.990 -999.990 1.694 ..P WKT 2010 09 06 08 44 55 31.3200 -97.3300 251.000 457.0 149.619 2.790 -999.990 -999.990 1.496 ..P WKT 2010 09 06 08 49 55 31.3200 -97.3300 251.000 30.0 175.932 3.680 -999.990 -999.990 1.759 ..P WKT 2010 09 06 08 54 55 31.3200 -97.3300 251.000 122.0 172.188 3.580 -999.990 -999.990 1.722 ..P WKT 2010 09 06 08 59 55 31.3200 -97.3300 251.000 457.0 139.488 3.380 -999.990 -999.990 1.395 ..P WKT 2010 09 06 09 09 55 31.3200 -97.3300 251.000 30.0 178.156 4.100 -999.990 -999.990 1.782 ..P WKT 2010 09 06 09 14 55 31.3200 -97.3300 251.000 122.0 169.026 3.970 -999.990 -999.990 1.690 ..P WKT 2010 09 06 09 19 55 31.3200 -97.3300 251.000 457.0 137.858 4.510 -999.990 -999.990 1.379 ..P WKT 2010 09 06 09 24 55 31.3200 -97.3300 251.000 30.0 174.186 2.890 -999.990 -999.990 1.742 ..P WKT 2010 09 06 09 29 55 31.3200 -97.3300 251.000 122.0 173.233 3.310 -999.990 -999.990 1.732 ..P WKT 2010 09 06 09 34 55 31.3200 -97.3300 251.000 457.0 145.522 2.750 -999.990 -999.990 1.455 ..P WKT 2010 09 06 09 44 55 31.3200 -97.3300 251.000 30.0 176.985 3.970 -999.990 -999.990 1.770 ..P WKT 2010 09 06 09 49 55 31.3200 -97.3300 251.000 122.0 166.284 3.980 -999.990 -999.990 1.663 ..P WKT 2010 09 06 09 54 55 31.3200 -97.3300 251.000 457.0 140.049 4.540 -999.990 -999.990 1.400 ..P WKT 2010 09 06 09 59 55 31.3200 -97.3300 251.000 30.0 172.339 4.440 -999.990 -999.990 1.723 ..P WKT 2010 09 06 10 04 55 31.3200 -97.3300 251.000 122.0 159.970 4.440 -999.990 -999.990 1.600 ..P WKT 2010 09 06 10 09 55 31.3200 -97.3300 251.000 457.0 135.670 6.550 -999.990 -999.990 1.357 ..P WKT 2010 09 06 10 19 55 31.3200 -97.3300 251.000 30.0 171.947 5.020 -999.990 -999.990 1.719 ..P WKT 2010 09 06 10 24 55 31.3200 -97.3300 251.000 122.0 158.167 4.900 -999.990 -999.990 1.582 ..P WKT 2010 09 06 10 29 55 31.3200 -97.3300 251.000 457.0 81.660 4.820 -999.990 -999.990 0.817 ..P WKT 2010 09 06 10 34 55 31.3200 -97.3300 251.000 30.0 166.682 4.370 -999.990 -999.990 1.667 ..P WKT 2010 09 06 10 39 55 31.3200 -97.3300 251.000 122.0 160.949 4.220 -999.990 -999.990 1.609 ..P WKT 2010 09 06 10 44 55 31.3200 -97.3300 251.000 457.0 95.248 3.440 -999.990 -999.990 0.952 ..P WKT 2010 09 06 10 54 55 31.3200 -97.3300 251.000 30.0 164.485 3.830 -999.990 -999.990 1.645 ..P WKT 2010 09 06 10 59 55 31.3200 -97.3300 251.000 122.0 160.890 3.800 -999.990 -999.990 1.609 ..P WKT 2010 09 06 11 04 55 31.3200 -97.3300 251.000 457.0 98.974 3.940 -999.990 -999.990 0.990 ..P WKT 2010 09 06 11 09 55 31.3200 -97.3300 251.000 30.0 158.699 4.570 -999.990 -999.990 1.587 ..P WKT 2010 09 06 11 14 55 31.3200 -97.3300 251.000 122.0 168.713 4.660 -999.990 -999.990 1.687 ..P WKT 2010 09 06 11 19 55 31.3200 -97.3300 251.000 457.0 95.391 5.840 -999.990 -999.990 0.954 ..P WKT 2010 09 06 11 29 55 31.3200 -97.3300 251.000 30.0 175.741 5.060 -999.990 -999.990 1.757 ..P WKT 2010 09 06 11 34 55 31.3200 -97.3300 251.000 122.0 173.014 4.680 -999.990 -999.990 1.730 ..P WKT 2010 09 06 11 39 55 31.3200 -97.3300 251.000 457.0 82.749 3.890 -999.990 -999.990 0.827 ..P WKT 2010 09 06 11 44 55 31.3200 -97.3300 251.000 30.0 167.835 4.150 -999.990 -999.990 1.678 ..P WKT 2010 09 06 11 49 55 31.3200 -97.3300 251.000 122.0 165.246 3.660 -999.990 -999.990 1.652 ..P WKT 2010 09 06 12 09 55 31.3200 -97.3300 251.000 457.0 81.243 2.700 -999.990 -999.990 0.812 ..P WKT 2010 09 06 12 10 25 31.3200 -97.3300 251.000 457.0 81.087 2.610 -999.990 -999.990 0.811 ..P WKT 2010 09 06 12 10 55 31.3200 -97.3300 251.000 457.0 84.408 2.920 -999.990 -999.990 0.844 ..P WKT 2010 09 06 12 11 25 31.3200 -97.3300 251.000 457.0 83.002 3.070 -999.990 -999.990 0.830 ..P WKT 2010 09 06 12 11 55 31.3200 -97.3300 251.000 457.0 80.204 3.590 -999.990 -999.990 0.802 ..P WKT 2010 09 06 12 12 25 31.3200 -97.3300 251.000 457.0 80.884 3.420 -999.990 -999.990 0.809 ..P WKT 2010 09 06 12 12 55 31.3200 -97.3300 251.000 457.0 82.953 2.930 -999.990 -999.990 0.830 ..P WKT 2010 09 06 12 13 25 31.3200 -97.3300 251.000 457.0 81.407 2.540 -999.990 -999.990 0.814 ..P WKT 2010 09 06 12 13 55 31.3200 -97.3300 251.000 457.0 84.311 3.100 -999.990 -999.990 0.843 ..P WKT 2010 09 06 12 14 25 31.3200 -97.3300 251.000 457.0 84.851 2.850 -999.990 -999.990 0.849 ..P WKT 2010 09 06 12 14 55 31.3200 -97.3300 251.000 457.0 85.808 3.070 -999.990 -999.990 0.858 ..P WKT 2010 09 06 12 19 55 31.3200 -97.3300 251.000 30.0 171.995 3.360 -999.990 -999.990 1.720 ..P WKT 2010 09 06 12 24 55 31.3200 -97.3300 251.000 122.0 146.254 4.510 -999.990 -999.990 1.463 ..P WKT 2010 09 06 12 29 55 31.3200 -97.3300 251.000 457.0 87.130 3.700 -999.990 -999.990 0.871 ..P WKT 2010 09 06 12 34 55 31.3200 -97.3300 251.000 30.0 170.419 3.960 -999.990 -999.990 1.704 ..P WKT 2010 09 06 12 39 55 31.3200 -97.3300 251.000 122.0 146.479 3.390 -999.990 -999.990 1.465 ..P WKT 2010 09 06 12 44 55 31.3200 -97.3300 251.000 457.0 89.011 3.520 -999.990 -999.990 0.890 ..P WKT 2010 09 06 12 54 55 31.3200 -97.3300 251.000 30.0 169.160 3.570 -999.990 -999.990 1.692 ..P WKT 2010 09 06 12 59 55 31.3200 -97.3300 251.000 122.0 131.075 4.150 -999.990 -999.990 1.311 ..P WKT 2010 09 06 13 04 55 31.3200 -97.3300 251.000 457.0 81.016 3.310 -999.990 -999.990 0.810 ..P WKT 2010 09 06 13 09 55 31.3200 -97.3300 251.000 30.0 171.784 4.040 -999.990 -999.990 1.718 ..P WKT 2010 09 06 13 14 55 31.3200 -97.3300 251.000 122.0 100.008 4.360 -999.990 -999.990 1.000 ..P WKT 2010 09 06 13 19 55 31.3200 -97.3300 251.000 457.0 84.313 2.900 -999.990 -999.990 0.843 ..P WKT 2010 09 06 13 29 55 31.3200 -97.3300 251.000 30.0 164.327 4.230 -999.990 -999.990 1.643 ..P WKT 2010 09 06 13 34 55 31.3200 -97.3300 251.000 122.0 95.768 3.700 -999.990 -999.990 0.958 ..P WKT 2010 09 06 13 39 55 31.3200 -97.3300 251.000 457.0 86.094 3.490 -999.990 -999.990 0.861 ..P WKT 2010 09 06 13 44 55 31.3200 -97.3300 251.000 30.0 152.589 3.170 -999.990 -999.990 1.526 ..P WKT 2010 09 06 13 49 55 31.3200 -97.3300 251.000 122.0 143.058 3.840 -999.990 -999.990 1.431 ..P WKT 2010 09 06 13 54 55 31.3200 -97.3300 251.000 457.0 84.222 2.910 -999.990 -999.990 0.842 ..P WKT 2010 09 06 14 04 55 31.3200 -97.3300 251.000 30.0 147.230 3.510 -999.990 -999.990 1.472 ..P WKT 2010 09 06 14 09 55 31.3200 -97.3300 251.000 122.0 129.795 3.800 -999.990 -999.990 1.298 ..P WKT 2010 09 06 14 14 55 31.3200 -97.3300 251.000 457.0 89.507 2.910 -999.990 -999.990 0.895 ..P WKT 2010 09 06 14 19 55 31.3200 -97.3300 251.000 30.0 159.008 3.250 -999.990 -999.990 1.590 ..P WKT 2010 09 06 14 24 55 31.3200 -97.3300 251.000 122.0 148.814 3.410 -999.990 -999.990 1.488 ..P WKT 2010 09 06 14 29 55 31.3200 -97.3300 251.000 457.0 86.501 3.220 -999.990 -999.990 0.865 ..P WKT 2010 09 06 14 39 55 31.3200 -97.3300 251.000 30.0 129.893 3.540 -999.990 -999.990 1.299 ..P WKT 2010 09 06 14 44 55 31.3200 -97.3300 251.000 122.0 138.890 3.200 -999.990 -999.990 1.389 ..P WKT 2010 09 06 14 49 55 31.3200 -97.3300 251.000 457.0 93.522 3.140 -999.990 -999.990 0.935 ..P WKT 2010 09 06 14 54 55 31.3200 -97.3300 251.000 30.0 119.527 3.840 -999.990 -999.990 1.195 ..P WKT 2010 09 06 14 59 55 31.3200 -97.3300 251.000 122.0 113.188 3.760 -999.990 -999.990 1.132 ..P WKT 2010 09 06 15 04 55 31.3200 -97.3300 251.000 457.0 90.395 3.100 -999.990 -999.990 0.904 ..P WKT 2010 09 06 15 14 55 31.3200 -97.3300 251.000 30.0 116.361 3.290 -999.990 -999.990 1.164 ..P WKT 2010 09 06 15 19 55 31.3200 -97.3300 251.000 122.0 106.554 3.610 -999.990 -999.990 1.066 ..P WKT 2010 09 06 15 24 55 31.3200 -97.3300 251.000 457.0 96.187 3.900 -999.990 -999.990 0.962 ..P WKT 2010 09 06 15 29 55 31.3200 -97.3300 251.000 30.0 103.673 3.860 -999.990 -999.990 1.037 ..P WKT 2010 09 06 15 34 55 31.3200 -97.3300 251.000 122.0 105.860 3.480 -999.990 -999.990 1.059 ..P WKT 2010 09 06 15 39 55 31.3200 -97.3300 251.000 457.0 93.397 3.990 -999.990 -999.990 0.934 ..P WKT 2010 09 06 15 49 55 31.3200 -97.3300 251.000 30.0 97.829 3.600 -999.990 -999.990 0.978 ..P WKT 2010 09 06 15 54 55 31.3200 -97.3300 251.000 122.0 104.403 4.310 -999.990 -999.990 1.044 ..P WKT 2010 09 06 15 59 55 31.3200 -97.3300 251.000 457.0 93.670 3.940 -999.990 -999.990 0.937 ..P WKT 2010 09 06 16 04 55 31.3200 -97.3300 251.000 30.0 99.964 5.370 -999.990 -999.990 1.000 ..P WKT 2010 09 06 16 09 55 31.3200 -97.3300 251.000 122.0 113.379 4.710 -999.990 -999.990 1.134 ..P WKT 2010 09 06 16 14 55 31.3200 -97.3300 251.000 457.0 97.200 3.930 -999.990 -999.990 0.972 ..P WKT 2010 09 06 16 24 55 31.3200 -97.3300 251.000 30.0 100.020 3.990 -999.990 -999.990 1.000 ..P WKT 2010 09 06 16 29 55 31.3200 -97.3300 251.000 122.0 111.066 4.220 -999.990 -999.990 1.111 ..P WKT 2010 09 06 16 34 55 31.3200 -97.3300 251.000 457.0 107.589 4.010 -999.990 -999.990 1.076 ..P WKT 2010 09 06 16 39 55 31.3200 -97.3300 251.000 30.0 104.671 4.180 -999.990 -999.990 1.047 ..P WKT 2010 09 06 16 44 55 31.3200 -97.3300 251.000 122.0 109.015 4.000 -999.990 -999.990 1.090 ..P WKT 2010 09 06 16 49 55 31.3200 -97.3300 251.000 457.0 107.354 4.200 -999.990 -999.990 1.074 ..P WKT 2010 09 06 17 04 55 31.3200 -97.3300 251.000 30.0 103.935 4.330 -999.990 -999.990 1.039 ..P WKT 2010 09 06 17 09 55 31.3200 -97.3300 251.000 122.0 111.091 5.030 -999.990 -999.990 1.111 ..P WKT 2010 09 06 17 14 55 31.3200 -97.3300 251.000 457.0 101.198 4.250 -999.990 -999.990 1.012 ..P WKT 2010 09 06 17 19 55 31.3200 -97.3300 251.000 30.0 94.379 3.960 -999.990 -999.990 0.944 ..P WKT 2010 09 06 17 24 55 31.3200 -97.3300 251.000 122.0 106.707 4.640 -999.990 -999.990 1.067 ..P WKT 2010 09 06 17 29 55 31.3200 -97.3300 251.000 457.0 91.641 4.060 -999.990 -999.990 0.916 ..P WKT 2010 09 06 17 39 55 31.3200 -97.3300 251.000 30.0 89.026 3.360 -999.990 -999.990 0.890 ..P WKT 2010 09 06 17 44 55 31.3200 -97.3300 251.000 122.0 102.322 4.250 -999.990 -999.990 1.023 ..P WKT 2010 09 06 17 49 55 31.3200 -97.3300 251.000 457.0 96.044 3.850 -999.990 -999.990 0.960 ..P WKT 2010 09 06 17 54 55 31.3200 -97.3300 251.000 30.0 94.240 3.970 -999.990 -999.990 0.942 ..P WKT 2010 09 06 17 59 55 31.3200 -97.3300 251.000 122.0 104.183 4.300 -999.990 -999.990 1.042 ..P WKT 2010 09 06 18 04 55 31.3200 -97.3300 251.000 457.0 92.868 5.700 -999.990 -999.990 0.929 ..P WKT 2010 09 06 18 14 55 31.3200 -97.3300 251.000 30.0 96.412 4.950 -999.990 -999.990 0.964 ..P WKT 2010 09 06 18 19 55 31.3200 -97.3300 251.000 122.0 102.602 5.070 -999.990 -999.990 1.026 ..P WKT 2010 09 06 18 24 55 31.3200 -97.3300 251.000 457.0 101.237 5.150 -999.990 -999.990 1.012 ..P WKT 2010 09 06 18 29 55 31.3200 -97.3300 251.000 30.0 103.230 4.890 -999.990 -999.990 1.032 ..P WKT 2010 09 06 18 34 55 31.3200 -97.3300 251.000 122.0 106.623 5.920 -999.990 -999.990 1.066 ..P WKT 2010 09 06 18 39 55 31.3200 -97.3300 251.000 457.0 102.459 5.150 -999.990 -999.990 1.025 ..P WKT 2010 09 06 18 49 55 31.3200 -97.3300 251.000 30.0 97.008 6.010 -999.990 -999.990 0.970 ..P WKT 2010 09 06 18 54 55 31.3200 -97.3300 251.000 122.0 106.361 5.170 -999.990 -999.990 1.064 ..P WKT 2010 09 06 18 59 55 31.3200 -97.3300 251.000 457.0 100.316 5.360 -999.990 -999.990 1.003 ..P WKT 2010 09 06 19 04 55 31.3200 -97.3300 251.000 30.0 98.470 4.770 -999.990 -999.990 0.985 ..P WKT 2010 09 06 19 09 55 31.3200 -97.3300 251.000 122.0 100.264 4.130 -999.990 -999.990 1.003 ..P WKT 2010 09 06 19 14 55 31.3200 -97.3300 251.000 457.0 98.978 4.240 -999.990 -999.990 0.990 ..P WKT 2010 09 06 19 24 55 31.3200 -97.3300 251.000 30.0 95.205 3.860 -999.990 -999.990 0.952 ..P WKT 2010 09 06 19 29 55 31.3200 -97.3300 251.000 122.0 102.241 4.280 -999.990 -999.990 1.022 ..P WKT 2010 09 06 19 34 55 31.3200 -97.3300 251.000 457.0 101.155 4.870 -999.990 -999.990 1.012 ..P WKT 2010 09 06 19 39 55 31.3200 -97.3300 251.000 30.0 98.668 4.570 -999.990 -999.990 0.987 ..P WKT 2010 09 06 19 44 55 31.3200 -97.3300 251.000 122.0 108.229 4.750 -999.990 -999.990 1.082 ..P WKT 2010 09 06 19 49 55 31.3200 -97.3300 251.000 457.0 102.799 4.060 -999.990 -999.990 1.028 ..P WKT 2010 09 06 19 59 55 31.3200 -97.3300 251.000 30.0 93.819 4.110 -999.990 -999.990 0.938 ..P WKT 2010 09 06 20 04 55 31.3200 -97.3300 251.000 122.0 106.386 4.110 -999.990 -999.990 1.064 ..P WKT 2010 09 06 20 09 55 31.3200 -97.3300 251.000 457.0 99.613 4.070 -999.990 -999.990 0.996 ..P WKT 2010 09 06 20 14 55 31.3200 -97.3300 251.000 30.0 93.680 3.940 -999.990 -999.990 0.937 ..P WKT 2010 09 06 20 19 55 31.3200 -97.3300 251.000 122.0 102.044 4.260 -999.990 -999.990 1.020 ..P WKT 2010 09 06 20 24 55 31.3200 -97.3300 251.000 457.0 98.072 4.410 -999.990 -999.990 0.981 ..P WKT 2010 09 06 20 34 55 31.3200 -97.3300 251.000 30.0 97.419 4.750 -999.990 -999.990 0.974 ..P WKT 2010 09 06 20 39 55 31.3200 -97.3300 251.000 122.0 105.926 4.610 -999.990 -999.990 1.059 ..P WKT 2010 09 06 20 44 55 31.3200 -97.3300 251.000 457.0 98.449 4.610 -999.990 -999.990 0.984 ..P WKT 2010 09 06 20 49 55 31.3200 -97.3300 251.000 30.0 96.159 5.030 -999.990 -999.990 0.962 ..P WKT 2010 09 06 20 54 55 31.3200 -97.3300 251.000 122.0 105.089 4.810 -999.990 -999.990 1.051 ..P WKT 2010 09 06 20 59 55 31.3200 -97.3300 251.000 457.0 101.537 5.600 -999.990 -999.990 1.015 ..P WKT 2010 09 06 21 09 55 31.3200 -97.3300 251.000 30.0 92.827 6.700 -999.990 -999.990 0.928 ..P WKT 2010 09 06 21 14 55 31.3200 -97.3300 251.000 122.0 94.123 4.570 -999.990 -999.990 0.941 ..P WKT 2010 09 06 21 19 55 31.3200 -97.3300 251.000 457.0 94.577 4.700 -999.990 -999.990 0.946 ..P WKT 2010 09 06 21 24 55 31.3200 -97.3300 251.000 30.0 88.436 4.390 -999.990 -999.990 0.884 ..P WKT 2010 09 06 21 29 55 31.3200 -97.3300 251.000 122.0 107.556 4.510 -999.990 -999.990 1.076 ..P WKT 2010 09 06 21 34 55 31.3200 -97.3300 251.000 457.0 96.924 4.920 -999.990 -999.990 0.969 ..P WKT 2010 09 06 21 44 55 31.3200 -97.3300 251.000 30.0 102.828 4.830 -999.990 -999.990 1.028 ..P WKT 2010 09 06 21 49 55 31.3200 -97.3300 251.000 122.0 99.713 4.990 -999.990 -999.990 0.997 ..P WKT 2010 09 06 21 54 55 31.3200 -97.3300 251.000 457.0 96.599 4.500 -999.990 -999.990 0.966 ..P WKT 2010 09 06 21 59 55 31.3200 -97.3300 251.000 30.0 93.484 5.580 -999.990 -999.990 0.935 ..P WKT 2010 09 06 22 04 55 31.3200 -97.3300 251.000 122.0 104.551 4.550 -999.990 -999.990 1.046 ..P WKT 2010 09 06 22 09 55 31.3200 -97.3300 251.000 457.0 98.627 4.880 -999.990 -999.990 0.986 ..P WKT 2010 09 06 22 19 55 31.3200 -97.3300 251.000 30.0 93.739 6.600 -999.990 -999.990 0.937 ..P WKT 2010 09 06 22 24 55 31.3200 -97.3300 251.000 122.0 100.394 5.130 -999.990 -999.990 1.004 ..P WKT 2010 09 06 22 29 55 31.3200 -97.3300 251.000 457.0 94.689 4.390 -999.990 -999.990 0.947 ..P WKT 2010 09 06 22 34 55 31.3200 -97.3300 251.000 30.0 98.958 4.380 -999.990 -999.990 0.990 ..P WKT 2010 09 06 22 39 55 31.3200 -97.3300 251.000 122.0 98.731 4.660 -999.990 -999.990 0.987 ..P WKT 2010 09 06 22 44 55 31.3200 -97.3300 251.000 457.0 85.576 4.790 -999.990 -999.990 0.856 ..P WKT 2010 09 06 22 54 55 31.3200 -97.3300 251.000 30.0 92.569 5.260 -999.990 -999.990 0.926 ..P WKT 2010 09 06 22 59 55 31.3200 -97.3300 251.000 122.0 97.261 4.970 -999.990 -999.990 0.973 ..P WKT 2010 09 06 23 04 55 31.3200 -97.3300 251.000 457.0 80.307 4.840 -999.990 -999.990 0.803 ..P WKT 2010 09 06 23 09 55 31.3200 -97.3300 251.000 30.0 82.187 5.370 -999.990 -999.990 0.822 ..P WKT 2010 09 06 23 14 55 31.3200 -97.3300 251.000 122.0 87.723 4.750 -999.990 -999.990 0.877 ..P WKT 2010 09 06 23 19 55 31.3200 -97.3300 251.000 457.0 89.323 4.950 -999.990 -999.990 0.893 ..P WKT 2010 09 06 23 29 55 31.3200 -97.3300 251.000 30.0 92.781 4.970 -999.990 -999.990 0.928 ..P WKT 2010 09 06 23 34 55 31.3200 -97.3300 251.000 122.0 90.700 5.060 -999.990 -999.990 0.907 ..P WKT 2010 09 06 23 39 55 31.3200 -97.3300 251.000 457.0 83.836 4.880 -999.990 -999.990 0.838 ..P WKT 2010 09 06 23 44 55 31.3200 -97.3300 251.000 30.0 91.038 5.180 -999.990 -999.990 0.910 ..P WKT 2010 09 06 23 49 55 31.3200 -97.3300 251.000 122.0 92.332 4.850 -999.990 -999.990 0.923 ..P WKT 2010 09 07 00 09 55 31.3200 -97.3300 251.000 457.0 83.605 5.140 -999.990 -999.990 0.836 ..P WKT 2010 09 07 00 10 25 31.3200 -97.3300 251.000 457.0 79.981 4.880 -999.990 -999.990 0.800 ..P WKT 2010 09 07 00 10 55 31.3200 -97.3300 251.000 457.0 80.295 5.160 -999.990 -999.990 0.803 ..P WKT 2010 09 07 00 11 25 31.3200 -97.3300 251.000 457.0 82.857 4.670 -999.990 -999.990 0.829 ..P WKT 2010 09 07 00 11 55 31.3200 -97.3300 251.000 457.0 77.828 4.750 -999.990 -999.990 0.778 ..P WKT 2010 09 07 00 12 25 31.3200 -97.3300 251.000 457.0 78.985 4.680 -999.990 -999.990 0.790 ..P WKT 2010 09 07 00 12 55 31.3200 -97.3300 251.000 457.0 75.924 4.730 -999.990 -999.990 0.759 ..P WKT 2010 09 07 00 13 25 31.3200 -97.3300 251.000 457.0 78.768 4.880 -999.990 -999.990 0.788 ..P WKT 2010 09 07 00 13 55 31.3200 -97.3300 251.000 457.0 79.643 4.720 -999.990 -999.990 0.796 ..P WKT 2010 09 07 00 14 25 31.3200 -97.3300 251.000 457.0 84.172 4.750 -999.990 -999.990 0.842 ..P WKT 2010 09 07 00 14 55 31.3200 -97.3300 251.000 457.0 82.518 4.740 -999.990 -999.990 0.825 ..P WKT 2010 09 07 00 19 55 31.3200 -97.3300 251.000 30.0 87.893 4.720 -999.990 -999.990 0.879 ..P WKT 2010 09 07 00 24 55 31.3200 -97.3300 251.000 122.0 83.295 4.560 -999.990 -999.990 0.833 ..P WKT 2010 09 07 00 29 55 31.3200 -97.3300 251.000 457.0 81.929 4.420 -999.990 -999.990 0.819 ..P WKT 2010 09 07 00 34 55 31.3200 -97.3300 251.000 30.0 87.299 4.490 -999.990 -999.990 0.873 ..P WKT 2010 09 07 00 39 55 31.3200 -97.3300 251.000 122.0 85.511 5.210 -999.990 -999.990 0.855 ..P WKT 2010 09 07 00 44 55 31.3200 -97.3300 251.000 457.0 81.481 4.300 -999.990 -999.990 0.815 ..P WKT 2010 09 07 00 54 55 31.3200 -97.3300 251.000 30.0 81.410 4.070 -999.990 -999.990 0.814 ..P WKT 2010 09 07 00 59 55 31.3200 -97.3300 251.000 122.0 91.246 4.560 -999.990 -999.990 0.912 ..P WKT 2010 09 07 01 04 55 31.3200 -97.3300 251.000 457.0 84.692 4.160 -999.990 -999.990 0.847 ..P WKT 2010 09 07 01 09 55 31.3200 -97.3300 251.000 30.0 76.185 5.040 -999.990 -999.990 0.762 ..P WKT 2010 09 07 01 14 55 31.3200 -97.3300 251.000 122.0 87.410 4.520 -999.990 -999.990 0.874 ..P WKT 2010 09 07 01 19 55 31.3200 -97.3300 251.000 457.0 88.138 4.320 -999.990 -999.990 0.881 ..P WKT 2010 09 07 01 29 55 31.3200 -97.3300 251.000 30.0 80.630 4.410 -999.990 -999.990 0.806 ..P WKT 2010 09 07 01 34 55 31.3200 -97.3300 251.000 122.0 80.222 4.610 -999.990 -999.990 0.802 ..P WKT 2010 09 07 01 39 55 31.3200 -97.3300 251.000 457.0 78.139 4.480 -999.990 -999.990 0.781 ..P WKT 2010 09 07 01 44 55 31.3200 -97.3300 251.000 30.0 93.367 4.720 -999.990 -999.990 0.934 ..P WKT 2010 09 07 01 49 55 31.3200 -97.3300 251.000 122.0 84.862 4.670 -999.990 -999.990 0.849 ..P WKT 2010 09 07 01 54 55 31.3200 -97.3300 251.000 457.0 79.711 4.970 -999.990 -999.990 0.797 ..P WKT 2010 09 07 02 04 55 31.3200 -97.3300 251.000 30.0 76.389 4.900 -999.990 -999.990 0.764 ..P WKT 2010 09 07 02 09 55 31.3200 -97.3300 251.000 122.0 77.935 5.600 -999.990 -999.990 0.779 ..P WKT 2010 09 07 02 14 55 31.3200 -97.3300 251.000 457.0 83.798 4.740 -999.990 -999.990 0.838 ..P WKT 2010 09 07 02 19 55 31.3200 -97.3300 251.000 30.0 79.909 4.580 -999.990 -999.990 0.799 ..P WKT 2010 09 07 02 24 55 31.3200 -97.3300 251.000 122.0 88.550 5.390 -999.990 -999.990 0.885 ..P WKT 2010 09 07 02 29 55 31.3200 -97.3300 251.000 457.0 86.611 4.680 -999.990 -999.990 0.866 ..P WKT 2010 09 07 02 39 55 31.3200 -97.3300 251.000 30.0 85.339 4.440 -999.990 -999.990 0.853 ..P WKT 2010 09 07 02 44 55 31.3200 -97.3300 251.000 122.0 87.671 4.830 -999.990 -999.990 0.877 ..P WKT 2010 09 07 02 49 55 31.3200 -97.3300 251.000 457.0 80.000 4.750 -999.990 -999.990 0.800 ..P WKT 2010 09 07 02 54 55 31.3200 -97.3300 251.000 30.0 82.889 4.730 -999.990 -999.990 0.829 ..P WKT 2010 09 07 02 59 55 31.3200 -97.3300 251.000 122.0 79.944 4.610 -999.990 -999.990 0.799 ..P WKT 2010 09 07 03 04 55 31.3200 -97.3300 251.000 457.0 75.614 4.870 -999.990 -999.990 0.756 ..P WKT 2010 09 07 03 14 55 31.3200 -97.3300 251.000 30.0 79.643 5.670 -999.990 -999.990 0.796 ..P WKT 2010 09 07 03 19 55 31.3200 -97.3300 251.000 122.0 83.833 4.740 -999.990 -999.990 0.838 ..P WKT 2010 09 07 03 24 55 31.3200 -97.3300 251.000 457.0 80.537 4.730 -999.990 -999.990 0.805 ..P WKT 2010 09 07 03 29 55 31.3200 -97.3300 251.000 30.0 77.799 3.890 -999.990 -999.990 0.778 ..P WKT 2010 09 07 03 34 55 31.3200 -97.3300 251.000 122.0 87.523 4.440 -999.990 -999.990 0.875 ..P WKT 2010 09 07 03 39 55 31.3200 -97.3300 251.000 457.0 83.953 3.680 -999.990 -999.990 0.840 ..P WKT 2010 09 07 03 49 55 31.3200 -97.3300 251.000 30.0 86.977 3.700 -999.990 -999.990 0.870 ..P WKT 2010 09 07 03 54 55 31.3200 -97.3300 251.000 122.0 83.885 3.990 -999.990 -999.990 0.839 ..P WKT 2010 09 07 03 59 55 31.3200 -97.3300 251.000 457.0 82.731 4.620 -999.990 -999.990 0.827 ..P WKT 2010 09 07 04 04 55 31.3200 -97.3300 251.000 30.0 81.577 3.590 -999.990 -999.990 0.816 ..P WKT 2010 09 07 04 09 55 31.3200 -97.3300 251.000 122.0 88.711 3.790 -999.990 -999.990 0.887 ..P WKT 2010 09 07 04 14 55 31.3200 -97.3300 251.000 457.0 82.586 3.830 -999.990 -999.990 0.826 ..P WKT 2010 09 07 04 24 55 31.3200 -97.3300 251.000 30.0 83.711 3.650 -999.990 -999.990 0.837 ..P WKT 2010 09 07 04 29 55 31.3200 -97.3300 251.000 122.0 90.538 3.690 -999.990 -999.990 0.905 ..P WKT 2010 09 07 04 34 55 31.3200 -97.3300 251.000 457.0 88.537 3.440 -999.990 -999.990 0.885 ..P WKT 2010 09 07 04 39 55 31.3200 -97.3300 251.000 30.0 88.741 4.610 -999.990 -999.990 0.887 ..P WKT 2010 09 07 04 44 55 31.3200 -97.3300 251.000 122.0 95.145 3.700 -999.990 -999.990 0.951 ..P WKT 2010 09 07 04 49 55 31.3200 -97.3300 251.000 457.0 83.369 3.700 -999.990 -999.990 0.834 ..P WKT 2010 09 07 05 04 55 31.3200 -97.3300 251.000 30.0 89.713 3.890 -999.990 -999.990 0.897 ..P WKT 2010 09 07 05 09 55 31.3200 -97.3300 251.000 122.0 92.021 3.470 -999.990 -999.990 0.920 ..P WKT 2010 09 07 05 14 55 31.3200 -97.3300 251.000 457.0 90.342 3.940 -999.990 -999.990 0.903 ..P WKT 2010 09 07 05 19 55 31.3200 -97.3300 251.000 30.0 87.978 4.750 -999.990 -999.990 0.880 ..P WKT 2010 09 07 05 24 55 31.3200 -97.3300 251.000 122.0 98.113 3.480 -999.990 -999.990 0.981 ..P WKT 2010 09 07 05 29 55 31.3200 -97.3300 251.000 457.0 82.980 3.850 -999.990 -999.990 0.830 ..P WKT 2010 09 07 05 39 55 31.3200 -97.3300 251.000 30.0 88.942 3.410 -999.990 -999.990 0.889 ..P WKT 2010 09 07 05 44 55 31.3200 -97.3300 251.000 122.0 91.771 5.040 -999.990 -999.990 0.918 ..P WKT 2010 09 07 05 49 55 31.3200 -97.3300 251.000 457.0 84.591 3.420 -999.990 -999.990 0.846 ..P WKT 2010 09 07 05 54 55 31.3200 -97.3300 251.000 30.0 86.324 3.670 -999.990 -999.990 0.863 ..P WKT 2010 09 07 05 59 55 31.3200 -97.3300 251.000 122.0 89.426 3.360 -999.990 -999.990 0.894 ..P WKT 2010 09 07 06 04 55 31.3200 -97.3300 251.000 457.0 81.433 3.370 -999.990 -999.990 0.814 ..P WKT 2010 09 07 06 14 55 31.3200 -97.3300 251.000 30.0 91.092 3.500 -999.990 -999.990 0.911 ..P WKT 2010 09 07 06 19 55 31.3200 -97.3300 251.000 122.0 97.509 3.880 -999.990 -999.990 0.975 ..P WKT 2010 09 07 06 24 55 31.3200 -97.3300 251.000 457.0 91.615 3.780 -999.990 -999.990 0.916 ..P WKT 2010 09 07 06 29 55 31.3200 -97.3300 251.000 30.0 92.834 3.860 -999.990 -999.990 0.928 ..P WKT 2010 09 07 06 34 55 31.3200 -97.3300 251.000 122.0 96.784 3.670 -999.990 -999.990 0.968 ..P WKT 2010 09 07 06 39 55 31.3200 -97.3300 251.000 457.0 81.609 3.630 -999.990 -999.990 0.816 ..P WKT 2010 09 07 06 49 55 31.3200 -97.3300 251.000 30.0 98.029 4.300 -999.990 -999.990 0.980 ..P WKT 2010 09 07 06 54 55 31.3200 -97.3300 251.000 122.0 103.121 3.720 -999.990 -999.990 1.031 ..P WKT 2010 09 07 06 59 55 31.3200 -97.3300 251.000 457.0 90.207 3.290 -999.990 -999.990 0.902 ..P WKT 2010 09 07 07 04 55 31.3200 -97.3300 251.000 30.0 98.843 2.930 -999.990 -999.990 0.988 ..P WKT 2010 09 07 07 09 55 31.3200 -97.3300 251.000 122.0 100.931 3.620 -999.990 -999.990 1.009 ..P WKT 2010 09 07 07 14 55 31.3200 -97.3300 251.000 457.0 72.501 2.740 -999.990 -999.990 0.725 ..P WKT 2010 09 07 07 24 55 31.3200 -97.3300 251.000 30.0 102.791 2.580 -999.990 -999.990 1.028 ..P WKT 2010 09 07 07 29 55 31.3200 -97.3300 251.000 122.0 103.747 3.170 -999.990 -999.990 1.037 ..P WKT 2010 09 07 07 34 55 31.3200 -97.3300 251.000 457.0 74.230 2.560 -999.990 -999.990 0.742 ..P WKT 2010 09 07 07 39 55 31.3200 -97.3300 251.000 30.0 103.209 2.510 -999.990 -999.990 1.032 ..P WKT 2010 09 07 07 44 55 31.3200 -97.3300 251.000 122.0 102.260 2.540 -999.990 -999.990 1.023 ..P WKT 2010 09 07 07 49 55 31.3200 -97.3300 251.000 457.0 77.940 2.350 -999.990 -999.990 0.779 ..P WKT 2010 09 07 07 59 55 31.3200 -97.3300 251.000 30.0 106.597 2.510 -999.990 -999.990 1.066 ..P WKT 2010 09 07 08 04 55 31.3200 -97.3300 251.000 122.0 103.050 2.910 -999.990 -999.990 1.030 ..P WKT 2010 09 07 08 09 55 31.3200 -97.3300 251.000 457.0 71.555 2.670 -999.990 -999.990 0.716 ..P WKT 2010 09 07 08 14 55 31.3200 -97.3300 251.000 30.0 105.188 4.440 -999.990 -999.990 1.052 ..P WKT 2010 09 07 08 19 55 31.3200 -97.3300 251.000 122.0 114.662 3.220 -999.990 -999.990 1.147 ..P WKT 2010 09 07 08 24 55 31.3200 -97.3300 251.000 457.0 76.692 3.620 -999.990 -999.990 0.767 ..P WKT 2010 09 07 08 34 55 31.3200 -97.3300 251.000 30.0 122.128 3.340 -999.990 -999.990 1.221 ..P WKT 2010 09 07 08 39 55 31.3200 -97.3300 251.000 122.0 122.453 5.090 -999.990 -999.990 1.225 ..P WKT 2010 09 07 08 44 55 31.3200 -97.3300 251.000 457.0 74.192 4.220 -999.990 -999.990 0.742 ..P WKT 2010 09 07 08 49 55 31.3200 -97.3300 251.000 30.0 124.726 3.500 -999.990 -999.990 1.247 ..P WKT 2010 09 07 08 54 55 31.3200 -97.3300 251.000 122.0 120.046 3.540 -999.990 -999.990 1.200 ..P WKT 2010 09 07 08 59 55 31.3200 -97.3300 251.000 457.0 79.949 2.920 -999.990 -999.990 0.799 ..P WKT 2010 09 07 09 09 55 31.3200 -97.3300 251.000 30.0 108.496 3.370 -999.990 -999.990 1.085 ..P WKT 2010 09 07 09 14 55 31.3200 -97.3300 251.000 122.0 101.032 3.280 -999.990 -999.990 1.010 ..P WKT 2010 09 07 09 19 55 31.3200 -97.3300 251.000 457.0 87.363 4.250 -999.990 -999.990 0.874 ..P WKT 2010 09 07 09 24 55 31.3200 -97.3300 251.000 30.0 101.233 4.210 -999.990 -999.990 1.012 ..P WKT 2010 09 07 09 29 55 31.3200 -97.3300 251.000 122.0 100.119 4.230 -999.990 -999.990 1.001 ..P WKT 2010 09 07 09 34 55 31.3200 -97.3300 251.000 457.0 86.600 3.550 -999.990 -999.990 0.866 ..P WKT 2010 09 07 09 44 55 31.3200 -97.3300 251.000 30.0 91.412 3.980 -999.990 -999.990 0.914 ..P WKT 2010 09 07 09 49 55 31.3200 -97.3300 251.000 122.0 99.347 2.900 -999.990 -999.990 0.993 ..P WKT 2010 09 07 09 54 55 31.3200 -97.3300 251.000 457.0 87.753 3.310 -999.990 -999.990 0.878 ..P WKT 2010 09 07 09 59 55 31.3200 -97.3300 251.000 30.0 96.895 3.510 -999.990 -999.990 0.969 ..P WKT 2010 09 07 10 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 10 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 10 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 10 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 10 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 10 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 10 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 10 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 10 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 10 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 11 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 11 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 11 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 11 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 11 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 11 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 11 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 11 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 11 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 10 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 10 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 11 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 11 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 12 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 12 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 13 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 13 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 14 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 07 12 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 12 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 12 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 12 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 12 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 13 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 13 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 13 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 13 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 13 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 13 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 13 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 13 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 13 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 13 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 14 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 14 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 14 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 14 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 14 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 14 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 14 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 14 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 14 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 14 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 14 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 15 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 15 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 15 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 15 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 15 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 15 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 15 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 15 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 15 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 15 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 16 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 16 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 16 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 16 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 16 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 16 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 16 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 16 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 16 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 17 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 17 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 17 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 17 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 17 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 17 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 17 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 17 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 17 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 17 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 17 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 18 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 18 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 18 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 18 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 18 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 18 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 18 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 18 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 18 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 18 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 19 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 19 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 19 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 19 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 19 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 19 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 19 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 19 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 19 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 19 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 20 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 20 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 20 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 20 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 20 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 20 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 20 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 20 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 20 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 20 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 20 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 21 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 21 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 21 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 21 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 21 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 21 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 21 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 21 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 21 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 21 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 22 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 22 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 22 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 22 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 22 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 22 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 22 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 22 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 22 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 22 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 23 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 23 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 23 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 23 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 23 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 23 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 23 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 23 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 07 23 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 10 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 10 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 11 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 11 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 12 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 12 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 13 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 13 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 14 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 00 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 01 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 01 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 01 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 01 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 01 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 01 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 01 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 01 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 01 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 01 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 02 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 02 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 02 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 02 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 02 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 02 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 02 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 02 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 02 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 02 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 02 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 03 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 03 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 03 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 03 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 03 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 03 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 03 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 03 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 03 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 03 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 04 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 04 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 04 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 04 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 04 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 04 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 04 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 04 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 04 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 05 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 05 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 05 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 05 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 05 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 05 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 05 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 05 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 05 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 05 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 05 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 06 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 06 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 06 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 06 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 06 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 06 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 06 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 06 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 06 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 06 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 07 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 07 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 07 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 07 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 07 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 07 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 07 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 07 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 07 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 07 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 08 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 08 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 08 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 08 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 08 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 08 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 08 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 08 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 08 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 08 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 08 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 09 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 09 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 09 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 09 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 09 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 09 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 09 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 09 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 09 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 09 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 10 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 10 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 10 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 10 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 10 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 10 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 10 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 10 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 10 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 10 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 11 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 11 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 11 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 11 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 11 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 11 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 11 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 11 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 11 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 10 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 10 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 11 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 11 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 12 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 12 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 13 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 13 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 14 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 12 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 13 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 13 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 13 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 13 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 13 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 13 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 13 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 13 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 13 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 13 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 14 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 14 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 14 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 14 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 14 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 14 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 14 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 14 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 14 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 14 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 14 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 15 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 15 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 15 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 15 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 15 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 15 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 15 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 15 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 15 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 15 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 16 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 16 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 16 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 16 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 16 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 16 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 16 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 16 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 16 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 17 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 17 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 17 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 17 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 17 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 17 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 17 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 17 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 17 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 17 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 17 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 18 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 18 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 18 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 18 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 18 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 18 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 18 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 18 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 18 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 18 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 19 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 19 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 19 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 19 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 19 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 19 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 19 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 19 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 19 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 19 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 20 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 20 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 20 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 20 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 20 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 20 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 20 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 20 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 20 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 20 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 20 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 21 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 21 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 21 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 21 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 21 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 21 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 21 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 21 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 21 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 21 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 22 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 22 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 22 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 22 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 22 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 22 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 22 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 22 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 22 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 22 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 23 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 23 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 23 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 23 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 23 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 23 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 23 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 23 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 08 23 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 10 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 10 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 11 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 11 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 12 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 12 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 13 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 13 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 14 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 00 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 01 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 01 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 01 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 01 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 01 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 01 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 01 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 01 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 01 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 01 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 02 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 02 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 02 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 02 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 02 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 02 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 02 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 02 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 02 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 02 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 02 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 03 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 03 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 03 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 03 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 03 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 03 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 03 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 03 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 03 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 03 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 04 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 04 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 04 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 04 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 04 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 04 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 04 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 04 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 04 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 05 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 05 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 05 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 05 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 05 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 05 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 05 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 05 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 05 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 05 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 05 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 06 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 06 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 06 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 06 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 06 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 06 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 06 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 06 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 06 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 06 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 07 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 07 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 07 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 07 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 07 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 07 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 07 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 07 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 07 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 07 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 08 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 08 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 08 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 08 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 08 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 08 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 08 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 08 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 08 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 08 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 08 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 09 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 09 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 09 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 09 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 09 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 09 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 09 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 09 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 09 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 09 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 10 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 10 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 10 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 10 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 10 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 10 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 10 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 10 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 10 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 10 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 11 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 11 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 11 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 11 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 11 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 11 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 11 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 11 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 11 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 10 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 10 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 11 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 11 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 12 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 12 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 13 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 13 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 14 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 12 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 13 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 13 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 13 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 13 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 13 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 13 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 13 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 13 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 13 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 13 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 14 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 14 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 14 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 14 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 14 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 14 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 14 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 14 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 14 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 14 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 14 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 15 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 15 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 15 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 15 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 15 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 15 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 15 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 15 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 15 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 15 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 16 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 16 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 16 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 16 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 16 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 16 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 16 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 16 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 16 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 17 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 17 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 17 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 17 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 17 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 17 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 17 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 17 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 17 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 17 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 17 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 18 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 18 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 18 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 18 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 18 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 18 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 18 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 18 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 18 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 18 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 19 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 19 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 19 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 19 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 19 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 19 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 19 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 19 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 19 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 19 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 20 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 20 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 20 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 20 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 20 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 20 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 20 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 20 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 20 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 20 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 20 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 21 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 21 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 21 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 21 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 21 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 21 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 21 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 21 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 21 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 21 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 22 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 22 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 22 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 22 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 22 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 22 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 22 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 22 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 22 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 22 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 23 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 23 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 23 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 23 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 23 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 23 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 23 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 23 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 09 23 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 10 00 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 10 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 10 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 11 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 11 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 12 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 12 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 13 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 13 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 14 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 00 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 01 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 01 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 01 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 01 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 01 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 01 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 01 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 01 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 01 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 01 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 02 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 02 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 02 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 02 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 02 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 02 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 02 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 02 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 02 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 02 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 02 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 03 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 03 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 03 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 03 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 03 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 03 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 03 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 03 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 03 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 03 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 04 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 04 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 04 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 04 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 04 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 04 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 04 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 04 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 04 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 05 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 05 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 05 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 05 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 05 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 05 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 05 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 05 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 05 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 05 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 05 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 06 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 06 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 06 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 06 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 06 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 06 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 06 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 06 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 06 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 06 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 07 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 07 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 07 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 07 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 07 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 07 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 07 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 07 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 07 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 07 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 08 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 08 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 08 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 08 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 08 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 08 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 08 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 08 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 08 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 08 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 08 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 09 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 09 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 09 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 09 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 09 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 09 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 09 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 09 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 09 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 09 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 10 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 10 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 10 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 10 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 10 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 10 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 10 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 10 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 10 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 10 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 11 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 11 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 11 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 11 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 11 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 11 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 11 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 11 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 11 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 10 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 10 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 11 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 11 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 12 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 12 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 13 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 13 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 14 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 12 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 13 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 13 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 13 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 13 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 13 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 13 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 13 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 13 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 13 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 13 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 14 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 14 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 14 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 14 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 14 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 14 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 14 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 14 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 14 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 14 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 14 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 15 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 15 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 15 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 15 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 15 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 15 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 15 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 15 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 15 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 15 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 16 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 16 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 16 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 16 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 16 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 16 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 16 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 16 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 16 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 17 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 17 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 17 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 17 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 17 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 17 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 17 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 17 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 17 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 17 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 17 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 18 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 18 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 18 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 18 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 18 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 18 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 18 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 18 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 18 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 18 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 19 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 19 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 19 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 19 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 19 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 19 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 19 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 19 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 19 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 19 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 20 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 20 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 20 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 20 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 20 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 20 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 20 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 20 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 20 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 20 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 20 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 21 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 21 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 21 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 21 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 21 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 21 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 21 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 21 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 21 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 21 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 22 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 22 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 22 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 22 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 22 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 22 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 22 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 22 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 22 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 22 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 23 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 23 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 23 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 23 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 23 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 23 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 23 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 23 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 10 23 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2010 09 11 00 09 55 31.3200 -97.3300 251.000 457.0 105.897 3.070 -999.990 -999.990 1.059 ..P WKT 2010 09 11 00 10 25 31.3200 -97.3300 251.000 457.0 104.714 3.080 -999.990 -999.990 1.047 ..P WKT 2010 09 11 00 10 55 31.3200 -97.3300 251.000 457.0 106.842 2.820 -999.990 -999.990 1.068 ..P WKT 2010 09 11 00 11 25 31.3200 -97.3300 251.000 457.0 101.247 4.080 -999.990 -999.990 1.012 ..P WKT 2010 09 11 00 11 55 31.3200 -97.3300 251.000 457.0 96.894 3.460 -999.990 -999.990 0.969 ..P WKT 2010 09 11 00 12 25 31.3200 -97.3300 251.000 457.0 103.156 2.880 -999.990 -999.990 1.032 ..P WKT 2010 09 11 00 12 55 31.3200 -97.3300 251.000 457.0 100.457 3.730 -999.990 -999.990 1.005 ..P WKT 2010 09 11 00 13 25 31.3200 -97.3300 251.000 457.0 98.586 3.570 -999.990 -999.990 0.986 ..P WKT 2010 09 11 00 13 55 31.3200 -97.3300 251.000 457.0 104.987 2.540 -999.990 -999.990 1.050 ..P WKT 2010 09 11 00 14 25 31.3200 -97.3300 251.000 457.0 98.289 4.320 -999.990 -999.990 0.983 ..P WKT 2010 09 11 00 14 55 31.3200 -97.3300 251.000 457.0 99.175 3.640 -999.990 -999.990 0.992 ..P WKT 2010 09 11 00 19 55 31.3200 -97.3300 251.000 30.0 102.794 2.760 -999.990 -999.990 1.028 ..P WKT 2010 09 11 00 24 55 31.3200 -97.3300 251.000 122.0 98.278 2.850 -999.990 -999.990 0.983 ..P WKT 2010 09 11 00 29 55 31.3200 -97.3300 251.000 457.0 101.620 2.230 -999.990 -999.990 1.016 ..P WKT 2010 09 11 00 34 55 31.3200 -97.3300 251.000 30.0 96.692 3.750 -999.990 -999.990 0.967 ..P WKT 2010 09 11 00 39 55 31.3200 -97.3300 251.000 122.0 103.343 2.520 -999.990 -999.990 1.033 ..P WKT 2010 09 11 00 44 55 31.3200 -97.3300 251.000 457.0 92.349 2.400 -999.990 -999.990 0.923 ..P WKT 2010 09 11 00 54 55 31.3200 -97.3300 251.000 30.0 98.209 2.480 -999.990 -999.990 0.982 ..P WKT 2010 09 11 00 59 55 31.3200 -97.3300 251.000 122.0 115.335 2.700 -999.990 -999.990 1.153 ..P WKT 2010 09 11 01 04 55 31.3200 -97.3300 251.000 457.0 99.935 2.680 -999.990 -999.990 0.999 ..P WKT 2010 09 11 01 09 55 31.3200 -97.3300 251.000 30.0 103.279 2.970 -999.990 -999.990 1.033 ..P WKT 2010 09 11 01 14 55 31.3200 -97.3300 251.000 122.0 116.268 3.890 -999.990 -999.990 1.163 ..P WKT 2010 09 11 01 19 55 31.3200 -97.3300 251.000 457.0 98.941 3.410 -999.990 -999.990 0.989 ..P WKT 2010 09 11 01 29 55 31.3200 -97.3300 251.000 30.0 126.334 4.820 -999.990 -999.990 1.263 ..P WKT 2010 09 11 01 34 55 31.3200 -97.3300 251.000 122.0 104.365 3.520 -999.990 -999.990 1.044 ..P WKT 2010 09 11 01 39 55 31.3200 -97.3300 251.000 457.0 96.449 3.430 -999.990 -999.990 0.964 ..P WKT 2010 09 11 01 44 55 31.3200 -97.3300 251.000 30.0 105.618 4.760 -999.990 -999.990 1.056 ..P WKT 2010 09 11 01 49 55 31.3200 -97.3300 251.000 122.0 107.621 3.740 -999.990 -999.990 1.076 ..P WKT 2010 09 11 01 54 55 31.3200 -97.3300 251.000 457.0 87.586 3.220 -999.990 -999.990 0.876 ..P WKT 2010 09 11 02 04 55 31.3200 -97.3300 251.000 30.0 102.476 3.070 -999.990 -999.990 1.025 ..P WKT 2010 09 11 02 09 55 31.3200 -97.3300 251.000 122.0 91.947 3.900 -999.990 -999.990 0.919 ..P WKT 2010 09 11 02 14 55 31.3200 -97.3300 251.000 457.0 95.190 4.910 -999.990 -999.990 0.952 ..P WKT 2010 09 11 02 19 55 31.3200 -97.3300 251.000 30.0 101.188 3.980 -999.990 -999.990 1.012 ..P WKT 2010 09 11 02 24 55 31.3200 -97.3300 251.000 122.0 89.283 2.120 -999.990 -999.990 0.893 ..P WKT 2010 09 11 02 29 55 31.3200 -97.3300 251.000 457.0 96.106 5.230 -999.990 -999.990 0.961 ..P WKT 2010 09 11 02 39 55 31.3200 -97.3300 251.000 30.0 117.894 4.350 -999.990 -999.990 1.179 ..P WKT 2010 09 11 02 44 55 31.3200 -97.3300 251.000 122.0 94.584 1.980 -999.990 -999.990 0.946 ..P WKT 2010 09 11 02 49 55 31.3200 -97.3300 251.000 457.0 92.751 3.310 -999.990 -999.990 0.928 ..P WKT 2010 09 11 02 54 55 31.3200 -97.3300 251.000 30.0 106.889 3.350 -999.990 -999.990 1.069 ..P WKT 2010 09 11 02 59 55 31.3200 -97.3300 251.000 122.0 94.595 2.310 -999.990 -999.990 0.946 ..P WKT 2010 09 11 03 04 55 31.3200 -97.3300 251.000 457.0 98.270 2.160 -999.990 -999.990 0.983 ..P WKT 2010 09 11 03 14 55 31.3200 -97.3300 251.000 30.0 101.665 4.280 -999.990 -999.990 1.017 ..P WKT 2010 09 11 03 19 55 31.3200 -97.3300 251.000 122.0 100.836 2.940 -999.990 -999.990 1.008 ..P WKT 2010 09 11 03 24 55 31.3200 -97.3300 251.000 457.0 92.301 2.410 -999.990 -999.990 0.923 ..P WKT 2010 09 11 03 29 55 31.3200 -97.3300 251.000 30.0 105.509 2.680 -999.990 -999.990 1.055 ..P WKT 2010 09 11 03 34 55 31.3200 -97.3300 251.000 122.0 93.671 2.520 -999.990 -999.990 0.937 ..P WKT 2010 09 11 03 39 55 31.3200 -97.3300 251.000 457.0 91.054 2.640 -999.990 -999.990 0.911 ..P WKT 2010 09 11 03 49 55 31.3200 -97.3300 251.000 30.0 95.649 3.770 -999.990 -999.990 0.956 ..P WKT 2010 09 11 03 54 55 31.3200 -97.3300 251.000 122.0 101.896 2.770 -999.990 -999.990 1.019 ..P WKT 2010 09 11 03 59 55 31.3200 -97.3300 251.000 457.0 89.020 2.490 -999.990 -999.990 0.890 ..P WKT 2010 09 11 04 04 55 31.3200 -97.3300 251.000 30.0 96.918 2.790 -999.990 -999.990 0.969 ..P WKT 2010 09 11 04 09 55 31.3200 -97.3300 251.000 122.0 91.885 2.120 -999.990 -999.990 0.919 ..P WKT 2010 09 11 04 14 55 31.3200 -97.3300 251.000 457.0 90.704 2.000 -999.990 -999.990 0.907 ..P WKT 2010 09 11 04 24 55 31.3200 -97.3300 251.000 30.0 97.182 2.980 -999.990 -999.990 0.972 ..P WKT 2010 09 11 04 29 55 31.3200 -97.3300 251.000 122.0 101.679 3.090 -999.990 -999.990 1.017 ..P WKT 2010 09 11 04 34 55 31.3200 -97.3300 251.000 457.0 89.948 2.350 -999.990 -999.990 0.899 ..P WKT 2010 09 11 04 39 55 31.3200 -97.3300 251.000 30.0 107.095 2.750 -999.990 -999.990 1.071 ..P WKT 2010 09 11 04 44 55 31.3200 -97.3300 251.000 122.0 97.565 2.370 -999.990 -999.990 0.976 ..P WKT 2010 09 11 04 49 55 31.3200 -97.3300 251.000 457.0 90.510 2.600 -999.990 -999.990 0.905 ..P WKT 2010 09 11 05 04 55 31.3200 -97.3300 251.000 30.0 110.182 2.630 -999.990 -999.990 1.102 ..P WKT 2010 09 11 05 09 55 31.3200 -97.3300 251.000 122.0 112.546 2.500 -999.990 -999.990 1.125 ..P WKT 2010 09 11 05 14 55 31.3200 -97.3300 251.000 457.0 96.213 2.340 -999.990 -999.990 0.962 ..P WKT 2010 09 11 05 19 55 31.3200 -97.3300 251.000 30.0 111.223 2.760 -999.990 -999.990 1.112 ..P WKT 2010 09 11 05 24 55 31.3200 -97.3300 251.000 122.0 107.263 2.400 -999.990 -999.990 1.073 ..P WKT 2010 09 11 05 29 55 31.3200 -97.3300 251.000 457.0 100.280 3.570 -999.990 -999.990 1.003 ..P WKT 2010 09 11 05 39 55 31.3200 -97.3300 251.000 30.0 112.103 2.740 -999.990 -999.990 1.121 ..P WKT 2010 09 11 05 44 55 31.3200 -97.3300 251.000 122.0 106.995 3.620 -999.990 -999.990 1.070 ..P WKT 2010 09 11 05 49 55 31.3200 -97.3300 251.000 457.0 95.017 2.910 -999.990 -999.990 0.950 ..P WKT 2010 09 11 05 54 55 31.3200 -97.3300 251.000 30.0 109.423 2.210 -999.990 -999.990 1.094 ..P WKT 2010 09 11 05 59 55 31.3200 -97.3300 251.000 122.0 110.911 1.810 -999.990 -999.990 1.109 ..P WKT 2010 09 11 06 04 55 31.3200 -97.3300 251.000 457.0 91.242 1.430 -999.990 -999.990 0.912 ..P WKT 2010 09 11 06 14 55 31.3200 -97.3300 251.000 30.0 102.639 1.810 -999.990 -999.990 1.026 ..P WKT 2010 09 11 06 19 55 31.3200 -97.3300 251.000 122.0 105.953 3.250 -999.990 -999.990 1.060 ..P WKT 2010 09 11 06 24 55 31.3200 -97.3300 251.000 457.0 92.234 2.510 -999.990 -999.990 0.922 ..P WKT 2010 09 11 06 29 55 31.3200 -97.3300 251.000 30.0 102.690 2.070 -999.990 -999.990 1.027 ..P WKT 2010 09 11 06 34 55 31.3200 -97.3300 251.000 122.0 104.491 2.850 -999.990 -999.990 1.045 ..P WKT 2010 09 11 06 39 55 31.3200 -97.3300 251.000 457.0 87.066 2.800 -999.990 -999.990 0.871 ..P WKT 2010 09 11 06 49 55 31.3200 -97.3300 251.000 30.0 105.660 3.330 -999.990 -999.990 1.057 ..P WKT 2010 09 11 06 54 55 31.3200 -97.3300 251.000 122.0 107.893 2.380 -999.990 -999.990 1.079 ..P WKT 2010 09 11 06 59 55 31.3200 -97.3300 251.000 457.0 94.061 2.200 -999.990 -999.990 0.941 ..P WKT 2010 09 11 07 04 55 31.3200 -97.3300 251.000 30.0 97.805 3.090 -999.990 -999.990 0.978 ..P WKT 2010 09 11 07 09 55 31.3200 -97.3300 251.000 122.0 103.197 2.180 -999.990 -999.990 1.032 ..P WKT 2010 09 11 07 14 55 31.3200 -97.3300 251.000 457.0 92.936 2.310 -999.990 -999.990 0.929 ..P WKT 2010 09 11 07 24 55 31.3200 -97.3300 251.000 30.0 103.973 2.080 -999.990 -999.990 1.040 ..P WKT 2010 09 11 07 29 55 31.3200 -97.3300 251.000 122.0 105.636 2.680 -999.990 -999.990 1.056 ..P WKT 2010 09 11 07 34 55 31.3200 -97.3300 251.000 457.0 97.281 3.300 -999.990 -999.990 0.973 ..P WKT 2010 09 11 07 39 55 31.3200 -97.3300 251.000 30.0 105.532 3.290 -999.990 -999.990 1.055 ..P WKT 2010 09 11 07 44 55 31.3200 -97.3300 251.000 122.0 108.843 2.640 -999.990 -999.990 1.088 ..P WKT 2010 09 11 07 49 55 31.3200 -97.3300 251.000 457.0 99.665 2.690 -999.990 -999.990 0.997 ..P WKT 2010 09 11 07 59 55 31.3200 -97.3300 251.000 30.0 110.617 2.750 -999.990 -999.990 1.106 ..P WKT 2010 09 11 08 04 55 31.3200 -97.3300 251.000 122.0 115.652 3.090 -999.990 -999.990 1.157 ..P WKT 2010 09 11 08 09 55 31.3200 -97.3300 251.000 457.0 90.913 3.550 -999.990 -999.990 0.909 ..P WKT 2010 09 11 08 14 55 31.3200 -97.3300 251.000 30.0 108.158 3.130 -999.990 -999.990 1.082 ..P WKT 2010 09 11 08 19 55 31.3200 -97.3300 251.000 122.0 104.137 2.450 -999.990 -999.990 1.041 ..P WKT 2010 09 11 08 24 55 31.3200 -97.3300 251.000 457.0 86.674 2.570 -999.990 -999.990 0.867 ..P WKT 2010 09 11 08 34 55 31.3200 -97.3300 251.000 30.0 98.898 2.680 -999.990 -999.990 0.989 ..P WKT 2010 09 11 08 39 55 31.3200 -97.3300 251.000 122.0 100.188 2.220 -999.990 -999.990 1.002 ..P WKT 2010 09 11 08 44 55 31.3200 -97.3300 251.000 457.0 83.102 2.860 -999.990 -999.990 0.831 ..P WKT 2010 09 11 08 49 55 31.3200 -97.3300 251.000 30.0 97.010 3.780 -999.990 -999.990 0.970 ..P WKT 2010 09 11 08 54 55 31.3200 -97.3300 251.000 122.0 98.026 2.630 -999.990 -999.990 0.980 ..P WKT 2010 09 11 08 59 55 31.3200 -97.3300 251.000 457.0 89.444 2.370 -999.990 -999.990 0.894 ..P WKT 2010 09 11 09 09 55 31.3200 -97.3300 251.000 30.0 93.749 3.360 -999.990 -999.990 0.937 ..P WKT 2010 09 11 09 14 55 31.3200 -97.3300 251.000 122.0 92.924 3.750 -999.990 -999.990 0.929 ..P WKT 2010 09 11 09 19 55 31.3200 -97.3300 251.000 457.0 85.520 2.970 -999.990 -999.990 0.855 ..P WKT 2010 09 11 09 24 55 31.3200 -97.3300 251.000 30.0 87.711 3.120 -999.990 -999.990 0.877 ..P WKT 2010 09 11 09 29 55 31.3200 -97.3300 251.000 122.0 92.096 3.070 -999.990 -999.990 0.921 ..P WKT 2010 09 11 09 34 55 31.3200 -97.3300 251.000 457.0 81.130 2.810 -999.990 -999.990 0.811 ..P WKT 2010 09 11 09 44 55 31.3200 -97.3300 251.000 30.0 89.663 3.350 -999.990 -999.990 0.897 ..P WKT 2010 09 11 09 49 55 31.3200 -97.3300 251.000 122.0 92.441 3.120 -999.990 -999.990 0.924 ..P WKT 2010 09 11 09 54 55 31.3200 -97.3300 251.000 457.0 85.901 3.380 -999.990 -999.990 0.859 ..P WKT 2010 09 11 09 59 55 31.3200 -97.3300 251.000 30.0 96.899 3.970 -999.990 -999.990 0.969 ..P WKT 2010 09 11 10 04 55 31.3200 -97.3300 251.000 122.0 93.648 3.350 -999.990 -999.990 0.936 ..P WKT 2010 09 11 10 09 55 31.3200 -97.3300 251.000 457.0 89.302 2.870 -999.990 -999.990 0.893 ..P WKT 2010 09 11 10 19 55 31.3200 -97.3300 251.000 30.0 87.694 3.660 -999.990 -999.990 0.877 ..P WKT 2010 09 11 10 24 55 31.3200 -97.3300 251.000 122.0 93.444 4.090 -999.990 -999.990 0.934 ..P WKT 2010 09 11 10 29 55 31.3200 -97.3300 251.000 457.0 84.677 3.290 -999.990 -999.990 0.847 ..P WKT 2010 09 11 10 34 55 31.3200 -97.3300 251.000 30.0 87.825 3.990 -999.990 -999.990 0.878 ..P WKT 2010 09 11 10 39 55 31.3200 -97.3300 251.000 122.0 94.534 3.560 -999.990 -999.990 0.945 ..P WKT 2010 09 11 10 44 55 31.3200 -97.3300 251.000 457.0 82.207 4.380 -999.990 -999.990 0.822 ..P WKT 2010 09 11 10 54 55 31.3200 -97.3300 251.000 30.0 83.711 4.260 -999.990 -999.990 0.837 ..P WKT 2010 09 11 10 59 55 31.3200 -97.3300 251.000 122.0 90.419 3.790 -999.990 -999.990 0.904 ..P WKT 2010 09 11 11 04 55 31.3200 -97.3300 251.000 457.0 75.631 3.700 -999.990 -999.990 0.756 ..P WKT 2010 09 11 11 09 55 31.3200 -97.3300 251.000 30.0 84.939 4.310 -999.990 -999.990 0.849 ..P WKT 2010 09 11 11 14 55 31.3200 -97.3300 251.000 122.0 88.634 4.110 -999.990 -999.990 0.886 ..P WKT 2010 09 11 11 19 55 31.3200 -97.3300 251.000 457.0 78.777 3.490 -999.990 -999.990 0.788 ..P WKT 2010 09 11 11 29 55 31.3200 -97.3300 251.000 30.0 85.904 4.430 -999.990 -999.990 0.859 ..P WKT 2010 09 11 11 34 55 31.3200 -97.3300 251.000 122.0 90.021 4.420 -999.990 -999.990 0.900 ..P WKT 2010 09 11 11 39 55 31.3200 -97.3300 251.000 457.0 84.283 4.840 -999.990 -999.990 0.843 ..P WKT 2010 09 11 11 44 55 31.3200 -97.3300 251.000 30.0 89.084 6.730 -999.990 -999.990 0.891 ..P WKT 2010 09 11 11 49 55 31.3200 -97.3300 251.000 122.0 98.536 6.370 -999.990 -999.990 0.985 ..P WKT 2010 09 11 12 09 55 31.3200 -97.3300 251.000 457.0 93.952 4.430 -999.990 -999.990 0.940 ..P WKT 2010 09 11 12 10 25 31.3200 -97.3300 251.000 457.0 96.286 4.150 -999.990 -999.990 0.963 ..P WKT 2010 09 11 12 10 55 31.3200 -97.3300 251.000 457.0 92.190 4.330 -999.990 -999.990 0.922 ..P WKT 2010 09 11 12 11 25 31.3200 -97.3300 251.000 457.0 87.957 4.950 -999.990 -999.990 0.880 ..P WKT 2010 09 11 12 11 55 31.3200 -97.3300 251.000 457.0 86.597 5.480 -999.990 -999.990 0.866 ..P WKT 2010 09 11 12 12 25 31.3200 -97.3300 251.000 457.0 92.900 4.690 -999.990 -999.990 0.929 ..P WKT 2010 09 11 12 12 55 31.3200 -97.3300 251.000 457.0 93.318 5.130 -999.990 -999.990 0.933 ..P WKT 2010 09 11 12 13 25 31.3200 -97.3300 251.000 457.0 86.349 5.100 -999.990 -999.990 0.863 ..P WKT 2010 09 11 12 13 55 31.3200 -97.3300 251.000 457.0 88.410 6.050 -999.990 -999.990 0.884 ..P WKT 2010 09 11 12 14 25 31.3200 -97.3300 251.000 457.0 96.080 5.010 -999.990 -999.990 0.961 ..P WKT 2010 09 11 12 14 55 31.3200 -97.3300 251.000 457.0 89.110 5.330 -999.990 -999.990 0.891 ..P WKT 2010 09 11 12 19 55 31.3200 -97.3300 251.000 30.0 91.931 6.390 -999.990 -999.990 0.919 ..P WKT 2010 09 11 12 24 55 31.3200 -97.3300 251.000 122.0 94.752 6.640 -999.990 -999.990 0.948 ..P WKT 2010 09 11 12 29 55 31.3200 -97.3300 251.000 457.0 87.995 5.770 -999.990 -999.990 0.880 ..P WKT 2010 09 11 12 34 55 31.3200 -97.3300 251.000 30.0 91.089 5.010 -999.990 -999.990 0.911 ..P WKT 2010 09 11 12 39 55 31.3200 -97.3300 251.000 122.0 90.899 4.340 -999.990 -999.990 0.909 ..P WKT 2010 09 11 12 44 55 31.3200 -97.3300 251.000 457.0 91.257 4.670 -999.990 -999.990 0.913 ..P WKT 2010 09 11 12 54 55 31.3200 -97.3300 251.000 30.0 86.423 4.350 -999.990 -999.990 0.864 ..P WKT 2010 09 11 12 59 55 31.3200 -97.3300 251.000 122.0 88.894 6.860 -999.990 -999.990 0.889 ..P WKT 2010 09 11 13 04 55 31.3200 -97.3300 251.000 457.0 90.271 5.350 -999.990 -999.990 0.903 ..P WKT 2010 09 11 13 09 55 31.3200 -97.3300 251.000 30.0 91.101 4.970 -999.990 -999.990 0.911 ..P WKT 2010 09 11 13 14 55 31.3200 -97.3300 251.000 122.0 92.752 5.550 -999.990 -999.990 0.928 ..P WKT 2010 09 11 13 19 55 31.3200 -97.3300 251.000 457.0 93.581 4.590 -999.990 -999.990 0.936 ..P WKT 2010 09 11 13 29 55 31.3200 -97.3300 251.000 30.0 91.603 4.900 -999.990 -999.990 0.916 ..P WKT 2010 09 11 13 34 55 31.3200 -97.3300 251.000 122.0 100.842 4.050 -999.990 -999.990 1.008 ..P WKT 2010 09 11 13 39 55 31.3200 -97.3300 251.000 457.0 96.117 4.600 -999.990 -999.990 0.961 ..P WKT 2010 09 11 13 44 55 31.3200 -97.3300 251.000 30.0 89.476 3.610 -999.990 -999.990 0.895 ..P WKT 2010 09 11 13 49 55 31.3200 -97.3300 251.000 122.0 101.728 3.340 -999.990 -999.990 1.017 ..P WKT 2010 09 11 13 54 55 31.3200 -97.3300 251.000 457.0 96.456 3.940 -999.990 -999.990 0.965 ..P WKT 2010 09 11 14 04 55 31.3200 -97.3300 251.000 30.0 96.062 3.160 -999.990 -999.990 0.961 ..P WKT 2010 09 11 14 09 55 31.3200 -97.3300 251.000 122.0 97.107 3.310 -999.990 -999.990 0.971 ..P WKT 2010 09 11 14 14 55 31.3200 -97.3300 251.000 457.0 92.948 5.220 -999.990 -999.990 0.929 ..P WKT 2010 09 11 14 19 55 31.3200 -97.3300 251.000 30.0 94.267 3.510 -999.990 -999.990 0.943 ..P WKT 2010 09 11 14 24 55 31.3200 -97.3300 251.000 122.0 100.379 3.480 -999.990 -999.990 1.004 ..P WKT 2010 09 11 14 29 55 31.3200 -97.3300 251.000 457.0 92.112 3.660 -999.990 -999.990 0.921 ..P WKT 2010 09 11 14 39 55 31.3200 -97.3300 251.000 30.0 101.050 3.630 -999.990 -999.990 1.010 ..P WKT 2010 09 11 14 44 55 31.3200 -97.3300 251.000 122.0 111.410 4.000 -999.990 -999.990 1.114 ..P WKT 2010 09 11 14 49 55 31.3200 -97.3300 251.000 457.0 100.265 4.780 -999.990 -999.990 1.003 ..P WKT 2010 09 11 14 54 55 31.3200 -97.3300 251.000 30.0 101.996 5.360 -999.990 -999.990 1.020 ..P WKT 2010 09 11 14 59 55 31.3200 -97.3300 251.000 122.0 115.095 5.110 -999.990 -999.990 1.151 ..P WKT 2010 09 11 15 04 55 31.3200 -97.3300 251.000 457.0 99.978 3.600 -999.990 -999.990 1.000 ..P WKT 2010 09 11 15 14 55 31.3200 -97.3300 251.000 30.0 100.718 4.890 -999.990 -999.990 1.007 ..P WKT 2010 09 11 15 19 55 31.3200 -97.3300 251.000 122.0 104.798 4.660 -999.990 -999.990 1.048 ..P WKT 2010 09 11 15 24 55 31.3200 -97.3300 251.000 457.0 100.932 5.020 -999.990 -999.990 1.009 ..P WKT 2010 09 11 15 29 55 31.3200 -97.3300 251.000 30.0 98.709 6.140 -999.990 -999.990 0.987 ..P WKT 2010 09 11 15 34 55 31.3200 -97.3300 251.000 122.0 98.677 5.140 -999.990 -999.990 0.987 ..P WKT 2010 09 11 15 39 55 31.3200 -97.3300 251.000 457.0 99.332 4.150 -999.990 -999.990 0.993 ..P WKT 2010 09 11 15 49 55 31.3200 -97.3300 251.000 30.0 101.189 5.160 -999.990 -999.990 1.012 ..P WKT 2010 09 11 15 54 55 31.3200 -97.3300 251.000 122.0 99.926 5.300 -999.990 -999.990 0.999 ..P WKT 2010 09 11 15 59 55 31.3200 -97.3300 251.000 457.0 99.894 8.050 -999.990 -999.990 0.999 ..P WKT 2010 09 11 16 04 55 31.3200 -97.3300 251.000 30.0 103.291 5.350 -999.990 -999.990 1.033 ..P WKT 2010 09 11 16 09 55 31.3200 -97.3300 251.000 122.0 114.224 5.840 -999.990 -999.990 1.142 ..P WKT 2010 09 11 16 14 55 31.3200 -97.3300 251.000 457.0 105.285 3.650 -999.990 -999.990 1.053 ..P WKT 2010 09 11 16 24 55 31.3200 -97.3300 251.000 30.0 107.554 4.280 -999.990 -999.990 1.076 ..P WKT 2010 09 11 16 29 55 31.3200 -97.3300 251.000 122.0 116.571 5.120 -999.990 -999.990 1.166 ..P WKT 2010 09 11 16 34 55 31.3200 -97.3300 251.000 457.0 110.235 6.230 -999.990 -999.990 1.102 ..P WKT 2010 09 11 16 39 55 31.3200 -97.3300 251.000 30.0 103.625 4.740 -999.990 -999.990 1.036 ..P WKT 2010 09 11 16 44 55 31.3200 -97.3300 251.000 122.0 115.658 3.600 -999.990 -999.990 1.157 ..P WKT 2010 09 11 16 49 55 31.3200 -97.3300 251.000 457.0 109.596 3.540 -999.990 -999.990 1.096 ..P WKT 2010 09 11 17 04 55 31.3200 -97.3300 251.000 30.0 108.076 6.260 -999.990 -999.990 1.081 ..P WKT 2010 09 11 17 09 55 31.3200 -97.3300 251.000 122.0 111.992 3.500 -999.990 -999.990 1.120 ..P WKT 2010 09 11 17 14 55 31.3200 -97.3300 251.000 457.0 110.150 3.730 -999.990 -999.990 1.102 ..P WKT 2010 09 11 17 19 55 31.3200 -97.3300 251.000 30.0 116.261 3.660 -999.990 -999.990 1.163 ..P WKT 2010 09 11 17 24 55 31.3200 -97.3300 251.000 122.0 126.212 4.270 -999.990 -999.990 1.262 ..P WKT 2010 09 11 17 29 55 31.3200 -97.3300 251.000 457.0 122.999 4.950 -999.990 -999.990 1.230 ..P WKT 2010 09 11 17 39 55 31.3200 -97.3300 251.000 30.0 123.909 3.840 -999.990 -999.990 1.239 ..P WKT 2010 09 11 17 44 55 31.3200 -97.3300 251.000 122.0 128.307 4.130 -999.990 -999.990 1.283 ..P WKT 2010 09 11 17 49 55 31.3200 -97.3300 251.000 457.0 125.025 4.840 -999.990 -999.990 1.250 ..P WKT 2010 09 11 17 54 55 31.3200 -97.3300 251.000 30.0 128.052 4.940 -999.990 -999.990 1.281 ..P WKT 2010 09 11 17 59 55 31.3200 -97.3300 251.000 122.0 135.194 4.890 -999.990 -999.990 1.352 ..P WKT 2010 09 11 18 04 55 31.3200 -97.3300 251.000 457.0 130.814 5.410 -999.990 -999.990 1.308 ..P WKT 2010 09 11 18 14 55 31.3200 -97.3300 251.000 30.0 125.072 5.410 -999.990 -999.990 1.251 ..P WKT 2010 09 11 18 19 55 31.3200 -97.3300 251.000 122.0 139.485 5.440 -999.990 -999.990 1.395 ..P WKT 2010 09 11 18 24 55 31.3200 -97.3300 251.000 457.0 133.048 4.440 -999.990 -999.990 1.330 ..P WKT 2010 09 11 18 29 55 31.3200 -97.3300 251.000 30.0 124.002 4.400 -999.990 -999.990 1.240 ..P WKT 2010 09 11 18 34 55 31.3200 -97.3300 251.000 122.0 131.009 3.920 -999.990 -999.990 1.310 ..P WKT 2010 09 11 18 39 55 31.3200 -97.3300 251.000 457.0 131.156 3.620 -999.990 -999.990 1.312 ..P WKT 2010 09 11 18 49 55 31.3200 -97.3300 251.000 30.0 120.218 4.170 -999.990 -999.990 1.202 ..P WKT 2010 09 11 18 54 55 31.3200 -97.3300 251.000 122.0 133.009 3.550 -999.990 -999.990 1.330 ..P WKT 2010 09 11 18 59 55 31.3200 -97.3300 251.000 457.0 115.336 3.550 -999.990 -999.990 1.153 ..P WKT 2010 09 11 19 04 55 31.3200 -97.3300 251.000 30.0 114.953 3.490 -999.990 -999.990 1.150 ..P WKT 2010 09 11 19 09 55 31.3200 -97.3300 251.000 122.0 125.822 3.890 -999.990 -999.990 1.258 ..P WKT 2010 09 11 19 14 55 31.3200 -97.3300 251.000 457.0 118.852 3.640 -999.990 -999.990 1.189 ..P WKT 2010 09 11 19 24 55 31.3200 -97.3300 251.000 30.0 117.224 3.160 -999.990 -999.990 1.172 ..P WKT 2010 09 11 19 29 55 31.3200 -97.3300 251.000 122.0 122.017 3.640 -999.990 -999.990 1.220 ..P WKT 2010 09 11 19 34 55 31.3200 -97.3300 251.000 457.0 115.144 4.060 -999.990 -999.990 1.151 ..P WKT 2010 09 11 19 39 55 31.3200 -97.3300 251.000 30.0 113.898 3.860 -999.990 -999.990 1.139 ..P WKT 2010 09 11 19 44 55 31.3200 -97.3300 251.000 122.0 123.633 3.330 -999.990 -999.990 1.236 ..P WKT 2010 09 11 19 49 55 31.3200 -97.3300 251.000 457.0 121.427 3.900 -999.990 -999.990 1.214 ..P WKT 2010 09 11 19 59 55 31.3200 -97.3300 251.000 30.0 115.581 3.440 -999.990 -999.990 1.156 ..P WKT 2010 09 11 20 04 55 31.3200 -97.3300 251.000 122.0 125.123 3.540 -999.990 -999.990 1.251 ..P WKT 2010 09 11 20 09 55 31.3200 -97.3300 251.000 457.0 123.681 4.300 -999.990 -999.990 1.237 ..P WKT 2010 09 11 20 14 55 31.3200 -97.3300 251.000 30.0 112.628 3.910 -999.990 -999.990 1.126 ..P WKT 2010 09 11 20 19 55 31.3200 -97.3300 251.000 122.0 122.719 4.500 -999.990 -999.990 1.227 ..P WKT 2010 09 11 20 24 55 31.3200 -97.3300 251.000 457.0 119.080 3.740 -999.990 -999.990 1.191 ..P WKT 2010 09 11 20 34 55 31.3200 -97.3300 251.000 30.0 108.348 3.680 -999.990 -999.990 1.083 ..P WKT 2010 09 11 20 39 55 31.3200 -97.3300 251.000 122.0 124.051 4.720 -999.990 -999.990 1.241 ..P WKT 2010 09 11 20 44 55 31.3200 -97.3300 251.000 457.0 116.410 4.090 -999.990 -999.990 1.164 ..P WKT 2010 09 11 20 49 55 31.3200 -97.3300 251.000 30.0 113.162 3.980 -999.990 -999.990 1.132 ..P WKT 2010 09 11 20 54 55 31.3200 -97.3300 251.000 122.0 124.197 3.590 -999.990 -999.990 1.242 ..P WKT 2010 09 11 20 59 55 31.3200 -97.3300 251.000 457.0 116.555 3.130 -999.990 -999.990 1.166 ..P WKT 2010 09 11 21 09 55 31.3200 -97.3300 251.000 30.0 104.250 3.780 -999.990 -999.990 1.042 ..P WKT 2010 09 11 21 14 55 31.3200 -97.3300 251.000 122.0 125.138 3.410 -999.990 -999.990 1.251 ..P WKT 2010 09 11 21 19 55 31.3200 -97.3300 251.000 457.0 114.982 4.790 -999.990 -999.990 1.150 ..P WKT 2010 09 11 21 24 55 31.3200 -97.3300 251.000 30.0 104.826 4.090 -999.990 -999.990 1.048 ..P WKT 2010 09 11 21 29 55 31.3200 -97.3300 251.000 122.0 119.121 4.960 -999.990 -999.990 1.191 ..P WKT 2010 09 11 21 34 55 31.3200 -97.3300 251.000 457.0 112.811 4.150 -999.990 -999.990 1.128 ..P WKT 2010 09 11 21 44 55 31.3200 -97.3300 251.000 30.0 105.685 3.350 -999.990 -999.990 1.057 ..P WKT 2010 09 11 21 49 55 31.3200 -97.3300 251.000 122.0 114.762 3.500 -999.990 -999.990 1.148 ..P WKT 2010 09 11 21 54 55 31.3200 -97.3300 251.000 457.0 109.001 3.640 -999.990 -999.990 1.090 ..P WKT 2010 09 11 21 59 55 31.3200 -97.3300 251.000 30.0 109.284 3.700 -999.990 -999.990 1.093 ..P WKT 2010 09 11 22 04 55 31.3200 -97.3300 251.000 122.0 118.636 3.460 -999.990 -999.990 1.186 ..P WKT 2010 09 11 22 09 55 31.3200 -97.3300 251.000 457.0 111.225 2.860 -999.990 -999.990 1.112 ..P WKT 2010 09 11 22 19 55 31.3200 -97.3300 251.000 30.0 106.924 3.190 -999.990 -999.990 1.069 ..P WKT 2010 09 11 22 24 55 31.3200 -97.3300 251.000 122.0 116.632 3.050 -999.990 -999.990 1.166 ..P WKT 2010 09 11 22 29 55 31.3200 -97.3300 251.000 457.0 110.259 3.380 -999.990 -999.990 1.103 ..P WKT 2010 09 11 22 34 55 31.3200 -97.3300 251.000 30.0 106.361 3.230 -999.990 -999.990 1.064 ..P WKT 2010 09 11 22 39 55 31.3200 -97.3300 251.000 122.0 113.733 5.570 -999.990 -999.990 1.137 ..P WKT 2010 09 11 22 44 55 31.3200 -97.3300 251.000 457.0 109.835 3.350 -999.990 -999.990 1.098 ..P WKT 2010 09 11 22 54 55 31.3200 -97.3300 251.000 30.0 108.085 3.230 -999.990 -999.990 1.081 ..P WKT 2010 09 11 22 59 55 31.3200 -97.3300 251.000 122.0 118.345 3.410 -999.990 -999.990 1.183 ..P WKT 2010 09 11 23 04 55 31.3200 -97.3300 251.000 457.0 113.209 3.210 -999.990 -999.990 1.132 ..P WKT 2010 09 11 23 09 55 31.3200 -97.3300 251.000 30.0 107.935 3.460 -999.990 -999.990 1.079 ..P WKT 2010 09 11 23 14 55 31.3200 -97.3300 251.000 122.0 123.420 3.570 -999.990 -999.990 1.234 ..P WKT 2010 09 11 23 19 55 31.3200 -97.3300 251.000 457.0 117.321 3.600 -999.990 -999.990 1.173 ..P WKT 2010 09 11 23 29 55 31.3200 -97.3300 251.000 30.0 108.430 2.980 -999.990 -999.990 1.084 ..P WKT 2010 09 11 23 34 55 31.3200 -97.3300 251.000 122.0 114.574 3.000 -999.990 -999.990 1.146 ..P WKT 2010 09 11 23 39 55 31.3200 -97.3300 251.000 457.0 108.619 3.190 -999.990 -999.990 1.086 ..P WKT 2010 09 11 23 44 55 31.3200 -97.3300 251.000 30.0 106.376 3.480 -999.990 -999.990 1.064 ..P WKT 2010 09 11 23 49 55 31.3200 -97.3300 251.000 122.0 112.246 3.480 -999.990 -999.990 1.122 ..P WKT 2010 09 12 00 09 55 31.3200 -97.3300 251.000 457.0 101.531 4.050 -999.990 -999.990 1.015 ..P WKT 2010 09 12 00 10 25 31.3200 -97.3300 251.000 457.0 107.831 4.250 -999.990 -999.990 1.078 ..P WKT 2010 09 12 00 10 55 31.3200 -97.3300 251.000 457.0 101.477 4.050 -999.990 -999.990 1.015 ..P WKT 2010 09 12 00 11 25 31.3200 -97.3300 251.000 457.0 108.052 3.720 -999.990 -999.990 1.081 ..P WKT 2010 09 12 00 11 55 31.3200 -97.3300 251.000 457.0 100.323 3.340 -999.990 -999.990 1.003 ..P WKT 2010 09 12 00 12 25 31.3200 -97.3300 251.000 457.0 103.047 4.220 -999.990 -999.990 1.030 ..P WKT 2010 09 12 00 12 55 31.3200 -97.3300 251.000 457.0 106.595 3.800 -999.990 -999.990 1.066 ..P WKT 2010 09 12 00 13 25 31.3200 -97.3300 251.000 457.0 105.743 3.550 -999.990 -999.990 1.057 ..P WKT 2010 09 12 00 13 55 31.3200 -97.3300 251.000 457.0 106.542 3.800 -999.990 -999.990 1.065 ..P WKT 2010 09 12 00 14 25 31.3200 -97.3300 251.000 457.0 105.140 3.550 -999.990 -999.990 1.051 ..P WKT 2010 09 12 00 14 55 31.3200 -97.3300 251.000 457.0 108.689 3.850 -999.990 -999.990 1.087 ..P WKT 2010 09 12 00 19 55 31.3200 -97.3300 251.000 30.0 103.469 3.330 -999.990 -999.990 1.035 ..P WKT 2010 09 12 00 24 55 31.3200 -97.3300 251.000 122.0 112.003 3.450 -999.990 -999.990 1.120 ..P WKT 2010 09 12 00 29 55 31.3200 -97.3300 251.000 457.0 107.058 3.550 -999.990 -999.990 1.071 ..P WKT 2010 09 12 00 34 55 31.3200 -97.3300 251.000 30.0 105.413 3.640 -999.990 -999.990 1.054 ..P WKT 2010 09 12 00 39 55 31.3200 -97.3300 251.000 122.0 103.769 4.480 -999.990 -999.990 1.038 ..P WKT 2010 09 12 00 44 55 31.3200 -97.3300 251.000 457.0 102.950 4.090 -999.990 -999.990 1.030 ..P WKT 2010 09 12 00 54 55 31.3200 -97.3300 251.000 30.0 109.567 3.670 -999.990 -999.990 1.096 ..P WKT 2010 09 12 00 59 55 31.3200 -97.3300 251.000 122.0 109.022 3.210 -999.990 -999.990 1.090 ..P WKT 2010 09 12 01 04 55 31.3200 -97.3300 251.000 457.0 104.626 4.450 -999.990 -999.990 1.046 ..P WKT 2010 09 12 01 09 55 31.3200 -97.3300 251.000 30.0 114.540 3.180 -999.990 -999.990 1.145 ..P WKT 2010 09 12 01 14 55 31.3200 -97.3300 251.000 122.0 104.639 3.480 -999.990 -999.990 1.046 ..P WKT 2010 09 12 01 19 55 31.3200 -97.3300 251.000 457.0 106.572 3.040 -999.990 -999.990 1.066 ..P WKT 2010 09 12 01 29 55 31.3200 -97.3300 251.000 30.0 117.043 3.500 -999.990 -999.990 1.170 ..P WKT 2010 09 12 01 34 55 31.3200 -97.3300 251.000 122.0 110.170 3.950 -999.990 -999.990 1.102 ..P WKT 2010 09 12 01 39 55 31.3200 -97.3300 251.000 457.0 109.075 3.910 -999.990 -999.990 1.091 ..P WKT 2010 09 12 01 44 55 31.3200 -97.3300 251.000 30.0 109.356 2.920 -999.990 -999.990 1.094 ..P WKT 2010 09 12 01 49 55 31.3200 -97.3300 251.000 122.0 107.161 3.440 -999.990 -999.990 1.072 ..P WKT 2010 09 12 01 54 55 31.3200 -97.3300 251.000 457.0 115.150 4.930 -999.990 -999.990 1.152 ..P WKT 2010 09 12 02 04 55 31.3200 -97.3300 251.000 30.0 102.598 4.420 -999.990 -999.990 1.026 ..P WKT 2010 09 12 02 09 55 31.3200 -97.3300 251.000 122.0 102.428 2.860 -999.990 -999.990 1.024 ..P WKT 2010 09 12 02 14 55 31.3200 -97.3300 251.000 457.0 106.249 3.580 -999.990 -999.990 1.062 ..P WKT 2010 09 12 02 19 55 31.3200 -97.3300 251.000 30.0 102.912 4.330 -999.990 -999.990 1.029 ..P WKT 2010 09 12 02 24 55 31.3200 -97.3300 251.000 122.0 104.531 3.420 -999.990 -999.990 1.045 ..P WKT 2010 09 12 02 29 55 31.3200 -97.3300 251.000 457.0 100.781 3.580 -999.990 -999.990 1.008 ..P WKT 2010 09 12 02 39 55 31.3200 -97.3300 251.000 30.0 106.871 3.390 -999.990 -999.990 1.069 ..P WKT 2010 09 12 02 44 55 31.3200 -97.3300 251.000 122.0 112.032 3.990 -999.990 -999.990 1.120 ..P WKT 2010 09 12 02 49 55 31.3200 -97.3300 251.000 457.0 107.140 3.670 -999.990 -999.990 1.071 ..P WKT 2010 09 12 02 54 55 31.3200 -97.3300 251.000 30.0 104.727 4.190 -999.990 -999.990 1.047 ..P WKT 2010 09 12 02 59 55 31.3200 -97.3300 251.000 122.0 104.792 3.490 -999.990 -999.990 1.048 ..P WKT 2010 09 12 03 04 55 31.3200 -97.3300 251.000 457.0 101.965 3.340 -999.990 -999.990 1.020 ..P WKT 2010 09 12 03 14 55 31.3200 -97.3300 251.000 30.0 102.765 3.350 -999.990 -999.990 1.028 ..P WKT 2010 09 12 03 19 55 31.3200 -97.3300 251.000 122.0 99.780 3.250 -999.990 -999.990 0.998 ..P WKT 2010 09 12 03 24 55 31.3200 -97.3300 251.000 457.0 91.424 4.180 -999.990 -999.990 0.914 ..P WKT 2010 09 12 03 29 55 31.3200 -97.3300 251.000 30.0 107.172 4.160 -999.990 -999.990 1.072 ..P WKT 2010 09 12 03 34 55 31.3200 -97.3300 251.000 122.0 95.509 2.880 -999.990 -999.990 0.955 ..P WKT 2010 09 12 03 39 55 31.3200 -97.3300 251.000 457.0 101.065 3.280 -999.990 -999.990 1.011 ..P WKT 2010 09 12 03 49 55 31.3200 -97.3300 251.000 30.0 112.452 3.240 -999.990 -999.990 1.125 ..P WKT 2010 09 12 03 54 55 31.3200 -97.3300 251.000 122.0 107.263 3.610 -999.990 -999.990 1.073 ..P WKT 2010 09 12 03 59 55 31.3200 -97.3300 251.000 457.0 101.109 2.940 -999.990 -999.990 1.011 ..P WKT 2010 09 12 04 04 55 31.3200 -97.3300 251.000 30.0 103.772 3.760 -999.990 -999.990 1.038 ..P WKT 2010 09 12 04 09 55 31.3200 -97.3300 251.000 122.0 98.996 3.310 -999.990 -999.990 0.990 ..P WKT 2010 09 12 04 14 55 31.3200 -97.3300 251.000 457.0 98.628 3.270 -999.990 -999.990 0.986 ..P WKT 2010 09 12 04 24 55 31.3200 -97.3300 251.000 30.0 116.299 3.400 -999.990 -999.990 1.163 ..P WKT 2010 09 12 04 29 55 31.3200 -97.3300 251.000 122.0 97.682 3.370 -999.990 -999.990 0.977 ..P WKT 2010 09 12 04 34 55 31.3200 -97.3300 251.000 457.0 106.626 4.060 -999.990 -999.990 1.066 ..P WKT 2010 09 12 04 39 55 31.3200 -97.3300 251.000 30.0 108.405 4.210 -999.990 -999.990 1.084 ..P WKT 2010 09 12 04 44 55 31.3200 -97.3300 251.000 122.0 104.118 3.830 -999.990 -999.990 1.041 ..P WKT 2010 09 12 04 49 55 31.3200 -97.3300 251.000 457.0 106.173 3.130 -999.990 -999.990 1.062 ..P WKT 2010 09 12 05 04 55 31.3200 -97.3300 251.000 30.0 109.894 4.240 -999.990 -999.990 1.099 ..P WKT 2010 09 12 05 09 55 31.3200 -97.3300 251.000 122.0 101.354 4.490 -999.990 -999.990 1.014 ..P WKT 2010 09 12 05 14 55 31.3200 -97.3300 251.000 457.0 106.047 4.900 -999.990 -999.990 1.060 ..P WKT 2010 09 12 05 19 55 31.3200 -97.3300 251.000 30.0 106.605 4.740 -999.990 -999.990 1.066 ..P WKT 2010 09 12 05 24 55 31.3200 -97.3300 251.000 122.0 100.546 3.280 -999.990 -999.990 1.005 ..P WKT 2010 09 12 05 29 55 31.3200 -97.3300 251.000 457.0 98.898 3.740 -999.990 -999.990 0.989 ..P WKT 2010 09 12 05 39 55 31.3200 -97.3300 251.000 30.0 118.252 3.940 -999.990 -999.990 1.183 ..P WKT 2010 09 12 05 44 55 31.3200 -97.3300 251.000 122.0 95.134 5.580 -999.990 -999.990 0.951 ..P WKT 2010 09 12 05 49 55 31.3200 -97.3300 251.000 457.0 94.077 3.860 -999.990 -999.990 0.941 ..P WKT 2010 09 12 05 54 55 31.3200 -97.3300 251.000 30.0 113.702 3.120 -999.990 -999.990 1.137 ..P WKT 2010 09 12 05 59 55 31.3200 -97.3300 251.000 122.0 98.579 2.950 -999.990 -999.990 0.986 ..P WKT 2010 09 12 06 04 55 31.3200 -97.3300 251.000 457.0 91.454 4.290 -999.990 -999.990 0.915 ..P WKT 2010 09 12 06 14 55 31.3200 -97.3300 251.000 30.0 107.976 3.420 -999.990 -999.990 1.080 ..P WKT 2010 09 12 06 19 55 31.3200 -97.3300 251.000 122.0 89.561 3.580 -999.990 -999.990 0.896 ..P WKT 2010 09 12 06 24 55 31.3200 -97.3300 251.000 457.0 99.418 2.690 -999.990 -999.990 0.994 ..P WKT 2010 09 12 06 29 55 31.3200 -97.3300 251.000 30.0 106.655 3.010 -999.990 -999.990 1.067 ..P WKT 2010 09 12 06 34 55 31.3200 -97.3300 251.000 122.0 93.342 2.600 -999.990 -999.990 0.933 ..P WKT 2010 09 12 06 39 55 31.3200 -97.3300 251.000 457.0 115.063 2.760 -999.990 -999.990 1.151 ..P WKT 2010 09 12 06 49 55 31.3200 -97.3300 251.000 30.0 107.726 2.900 -999.990 -999.990 1.077 ..P WKT 2010 09 12 06 54 55 31.3200 -97.3300 251.000 122.0 99.908 2.850 -999.990 -999.990 0.999 ..P WKT 2010 09 12 06 59 55 31.3200 -97.3300 251.000 457.0 98.575 3.630 -999.990 -999.990 0.986 ..P WKT 2010 09 12 07 04 55 31.3200 -97.3300 251.000 30.0 104.553 2.980 -999.990 -999.990 1.046 ..P WKT 2010 09 12 07 09 55 31.3200 -97.3300 251.000 122.0 93.285 3.200 -999.990 -999.990 0.933 ..P WKT 2010 09 12 07 14 55 31.3200 -97.3300 251.000 457.0 102.574 3.230 -999.990 -999.990 1.026 ..P WKT 2010 09 12 07 24 55 31.3200 -97.3300 251.000 30.0 111.299 3.540 -999.990 -999.990 1.113 ..P WKT 2010 09 12 07 29 55 31.3200 -97.3300 251.000 122.0 99.834 2.980 -999.990 -999.990 0.998 ..P WKT 2010 09 12 07 34 55 31.3200 -97.3300 251.000 457.0 99.544 3.760 -999.990 -999.990 0.995 ..P WKT 2010 09 12 07 39 55 31.3200 -97.3300 251.000 30.0 110.846 3.640 -999.990 -999.990 1.108 ..P WKT 2010 09 12 07 44 55 31.3200 -97.3300 251.000 122.0 90.409 4.080 -999.990 -999.990 0.904 ..P WKT 2010 09 12 07 49 55 31.3200 -97.3300 251.000 457.0 103.230 2.880 -999.990 -999.990 1.032 ..P WKT 2010 09 12 07 59 55 31.3200 -97.3300 251.000 30.0 109.512 3.150 -999.990 -999.990 1.095 ..P WKT 2010 09 12 08 04 55 31.3200 -97.3300 251.000 122.0 94.691 3.320 -999.990 -999.990 0.947 ..P WKT 2010 09 12 08 09 55 31.3200 -97.3300 251.000 457.0 99.883 4.990 -999.990 -999.990 0.999 ..P WKT 2010 09 12 08 14 55 31.3200 -97.3300 251.000 30.0 110.045 3.350 -999.990 -999.990 1.100 ..P WKT 2010 09 12 08 19 55 31.3200 -97.3300 251.000 122.0 96.188 3.360 -999.990 -999.990 0.962 ..P WKT 2010 09 12 08 24 55 31.3200 -97.3300 251.000 457.0 103.314 3.800 -999.990 -999.990 1.033 ..P WKT 2010 09 12 08 34 55 31.3200 -97.3300 251.000 30.0 106.146 3.170 -999.990 -999.990 1.061 ..P WKT 2010 09 12 08 39 55 31.3200 -97.3300 251.000 122.0 126.980 4.650 -999.990 -999.990 1.270 ..P WKT 2010 09 12 08 44 55 31.3200 -97.3300 251.000 457.0 106.396 3.400 -999.990 -999.990 1.064 ..P WKT 2010 09 12 08 49 55 31.3200 -97.3300 251.000 30.0 114.805 3.370 -999.990 -999.990 1.148 ..P WKT 2010 09 12 08 54 55 31.3200 -97.3300 251.000 122.0 110.235 3.450 -999.990 -999.990 1.102 ..P WKT 2010 09 12 08 59 55 31.3200 -97.3300 251.000 457.0 96.000 3.330 -999.990 -999.990 0.960 ..P WKT 2010 09 12 09 09 55 31.3200 -97.3300 251.000 30.0 111.438 3.360 -999.990 -999.990 1.114 ..P WKT 2010 09 12 09 14 55 31.3200 -97.3300 251.000 122.0 107.697 3.640 -999.990 -999.990 1.077 ..P WKT 2010 09 12 09 19 55 31.3200 -97.3300 251.000 457.0 110.308 3.350 -999.990 -999.990 1.103 ..P WKT 2010 09 12 09 24 55 31.3200 -97.3300 251.000 30.0 115.957 3.720 -999.990 -999.990 1.160 ..P WKT 2010 09 12 09 29 55 31.3200 -97.3300 251.000 122.0 112.491 4.120 -999.990 -999.990 1.125 ..P WKT 2010 09 12 09 34 55 31.3200 -97.3300 251.000 457.0 89.689 3.440 -999.990 -999.990 0.897 ..P WKT 2010 09 12 09 44 55 31.3200 -97.3300 251.000 30.0 112.926 4.540 -999.990 -999.990 1.129 ..P WKT 2010 09 12 09 49 55 31.3200 -97.3300 251.000 122.0 121.397 3.260 -999.990 -999.990 1.214 ..P WKT 2010 09 12 09 54 55 31.3200 -97.3300 251.000 457.0 100.033 3.830 -999.990 -999.990 1.000 ..P WKT 2010 09 12 09 59 55 31.3200 -97.3300 251.000 30.0 112.097 3.860 -999.990 -999.990 1.121 ..P WKT 2010 09 12 10 04 55 31.3200 -97.3300 251.000 122.0 122.918 3.340 -999.990 -999.990 1.229 ..P WKT 2010 09 12 10 09 55 31.3200 -97.3300 251.000 457.0 90.913 4.800 -999.990 -999.990 0.909 ..P WKT 2010 09 12 10 19 55 31.3200 -97.3300 251.000 30.0 116.051 3.710 -999.990 -999.990 1.161 ..P WKT 2010 09 12 10 24 55 31.3200 -97.3300 251.000 122.0 112.544 4.020 -999.990 -999.990 1.125 ..P WKT 2010 09 12 10 29 55 31.3200 -97.3300 251.000 457.0 90.522 3.480 -999.990 -999.990 0.905 ..P WKT 2010 09 12 10 34 55 31.3200 -97.3300 251.000 30.0 119.486 4.240 -999.990 -999.990 1.195 ..P WKT 2010 09 12 10 39 55 31.3200 -97.3300 251.000 122.0 102.714 3.620 -999.990 -999.990 1.027 ..P WKT 2010 09 12 10 44 55 31.3200 -97.3300 251.000 457.0 87.599 3.820 -999.990 -999.990 0.876 ..P WKT 2010 09 12 10 54 55 31.3200 -97.3300 251.000 30.0 116.059 3.540 -999.990 -999.990 1.161 ..P WKT 2010 09 12 10 59 55 31.3200 -97.3300 251.000 122.0 94.822 5.350 -999.990 -999.990 0.948 ..P WKT 2010 09 12 11 04 55 31.3200 -97.3300 251.000 457.0 85.469 4.010 -999.990 -999.990 0.855 ..P WKT 2010 09 12 11 09 55 31.3200 -97.3300 251.000 30.0 119.515 4.080 -999.990 -999.990 1.195 ..P WKT 2010 09 12 11 14 55 31.3200 -97.3300 251.000 122.0 99.382 3.820 -999.990 -999.990 0.994 ..P WKT 2010 09 12 11 19 55 31.3200 -97.3300 251.000 457.0 93.345 3.310 -999.990 -999.990 0.933 ..P WKT 2010 09 12 11 29 55 31.3200 -97.3300 251.000 30.0 124.326 3.630 -999.990 -999.990 1.243 ..P WKT 2010 09 12 11 34 55 31.3200 -97.3300 251.000 122.0 89.601 3.480 -999.990 -999.990 0.896 ..P WKT 2010 09 12 11 39 55 31.3200 -97.3300 251.000 457.0 95.517 5.050 -999.990 -999.990 0.955 ..P WKT 2010 09 12 11 44 55 31.3200 -97.3300 251.000 30.0 121.479 4.230 -999.990 -999.990 1.215 ..P WKT 2010 09 12 11 49 55 31.3200 -97.3300 251.000 122.0 87.302 3.460 -999.990 -999.990 0.873 ..P WKT 2010 09 12 12 09 55 31.3200 -97.3300 251.000 457.0 90.391 3.900 -999.990 -999.990 0.904 ..P WKT 2010 09 12 12 10 25 31.3200 -97.3300 251.000 457.0 82.139 2.860 -999.990 -999.990 0.821 ..P WKT 2010 09 12 12 10 55 31.3200 -97.3300 251.000 457.0 83.841 3.450 -999.990 -999.990 0.838 ..P WKT 2010 09 12 12 11 25 31.3200 -97.3300 251.000 457.0 88.030 3.470 -999.990 -999.990 0.880 ..P WKT 2010 09 12 12 11 55 31.3200 -97.3300 251.000 457.0 84.478 3.900 -999.990 -999.990 0.845 ..P WKT 2010 09 12 12 12 25 31.3200 -97.3300 251.000 457.0 87.838 2.820 -999.990 -999.990 0.878 ..P WKT 2010 09 12 12 12 55 31.3200 -97.3300 251.000 457.0 89.817 3.140 -999.990 -999.990 0.898 ..P WKT 2010 09 12 12 13 25 31.3200 -97.3300 251.000 457.0 90.689 3.220 -999.990 -999.990 0.907 ..P WKT 2010 09 12 12 13 55 31.3200 -97.3300 251.000 457.0 89.625 3.810 -999.990 -999.990 0.896 ..P WKT 2010 09 12 12 14 25 31.3200 -97.3300 251.000 457.0 83.309 3.280 -999.990 -999.990 0.833 ..P WKT 2010 09 12 12 14 55 31.3200 -97.3300 251.000 457.0 82.798 3.040 -999.990 -999.990 0.828 ..P WKT 2010 09 12 12 19 55 31.3200 -97.3300 251.000 30.0 116.674 3.510 -999.990 -999.990 1.167 ..P WKT 2010 09 12 12 24 55 31.3200 -97.3300 251.000 122.0 93.048 3.470 -999.990 -999.990 0.930 ..P WKT 2010 09 12 12 29 55 31.3200 -97.3300 251.000 457.0 97.066 3.840 -999.990 -999.990 0.971 ..P WKT 2010 09 12 12 34 55 31.3200 -97.3300 251.000 30.0 110.480 3.430 -999.990 -999.990 1.105 ..P WKT 2010 09 12 12 39 55 31.3200 -97.3300 251.000 122.0 101.231 3.320 -999.990 -999.990 1.012 ..P WKT 2010 09 12 12 44 55 31.3200 -97.3300 251.000 457.0 101.102 4.360 -999.990 -999.990 1.011 ..P WKT 2010 09 12 12 54 55 31.3200 -97.3300 251.000 30.0 119.007 3.380 -999.990 -999.990 1.190 ..P WKT 2010 09 12 12 59 55 31.3200 -97.3300 251.000 122.0 94.213 3.590 -999.990 -999.990 0.942 ..P WKT 2010 09 12 13 04 55 31.3200 -97.3300 251.000 457.0 98.430 3.140 -999.990 -999.990 0.984 ..P WKT 2010 09 12 13 09 55 31.3200 -97.3300 251.000 30.0 115.078 5.240 -999.990 -999.990 1.151 ..P WKT 2010 09 12 13 14 55 31.3200 -97.3300 251.000 122.0 84.490 3.370 -999.990 -999.990 0.845 ..P WKT 2010 09 12 13 19 55 31.3200 -97.3300 251.000 457.0 89.812 3.080 -999.990 -999.990 0.898 ..P WKT 2010 09 12 13 29 55 31.3200 -97.3300 251.000 30.0 110.908 3.260 -999.990 -999.990 1.109 ..P WKT 2010 09 12 13 34 55 31.3200 -97.3300 251.000 122.0 84.432 3.660 -999.990 -999.990 0.844 ..P WKT 2010 09 12 13 39 55 31.3200 -97.3300 251.000 457.0 97.168 4.030 -999.990 -999.990 0.972 ..P WKT 2010 09 12 13 44 55 31.3200 -97.3300 251.000 30.0 119.565 3.900 -999.990 -999.990 1.196 ..P WKT 2010 09 12 13 49 55 31.3200 -97.3300 251.000 122.0 115.180 4.240 -999.990 -999.990 1.152 ..P WKT 2010 09 12 13 54 55 31.3200 -97.3300 251.000 457.0 94.785 4.850 -999.990 -999.990 0.948 ..P WKT 2010 09 12 14 04 55 31.3200 -97.3300 251.000 30.0 107.747 5.090 -999.990 -999.990 1.077 ..P WKT 2010 09 12 14 09 55 31.3200 -97.3300 251.000 122.0 111.151 4.490 -999.990 -999.990 1.112 ..P WKT 2010 09 12 14 14 55 31.3200 -97.3300 251.000 457.0 100.618 4.670 -999.990 -999.990 1.006 ..P WKT 2010 09 12 14 19 55 31.3200 -97.3300 251.000 30.0 104.574 4.140 -999.990 -999.990 1.046 ..P WKT 2010 09 12 14 24 55 31.3200 -97.3300 251.000 122.0 107.288 4.060 -999.990 -999.990 1.073 ..P WKT 2010 09 12 14 29 55 31.3200 -97.3300 251.000 457.0 99.103 3.740 -999.990 -999.990 0.991 ..P WKT 2010 09 12 14 39 55 31.3200 -97.3300 251.000 30.0 99.604 3.430 -999.990 -999.990 0.996 ..P WKT 2010 09 12 14 44 55 31.3200 -97.3300 251.000 122.0 114.769 3.650 -999.990 -999.990 1.148 ..P WKT 2010 09 12 14 49 55 31.3200 -97.3300 251.000 457.0 99.041 4.190 -999.990 -999.990 0.990 ..P WKT 2010 09 12 14 54 55 31.3200 -97.3300 251.000 30.0 99.311 3.180 -999.990 -999.990 0.993 ..P WKT 2010 09 12 14 59 55 31.3200 -97.3300 251.000 122.0 111.577 3.490 -999.990 -999.990 1.116 ..P WKT 2010 09 12 15 04 55 31.3200 -97.3300 251.000 457.0 102.195 4.210 -999.990 -999.990 1.022 ..P WKT 2010 09 12 15 14 55 31.3200 -97.3300 251.000 30.0 107.559 2.880 -999.990 -999.990 1.076 ..P WKT 2010 09 12 15 19 55 31.3200 -97.3300 251.000 122.0 114.996 3.910 -999.990 -999.990 1.150 ..P WKT 2010 09 12 15 24 55 31.3200 -97.3300 251.000 457.0 105.892 3.310 -999.990 -999.990 1.059 ..P WKT 2010 09 12 15 29 55 31.3200 -97.3300 251.000 30.0 100.649 3.440 -999.990 -999.990 1.006 ..P WKT 2010 09 12 15 34 55 31.3200 -97.3300 251.000 122.0 110.979 3.790 -999.990 -999.990 1.110 ..P WKT 2010 09 12 15 39 55 31.3200 -97.3300 251.000 457.0 106.562 2.600 -999.990 -999.990 1.066 ..P WKT 2010 09 12 15 49 55 31.3200 -97.3300 251.000 30.0 100.016 4.050 -999.990 -999.990 1.000 ..P WKT 2010 09 12 15 54 55 31.3200 -97.3300 251.000 122.0 113.727 2.620 -999.990 -999.990 1.137 ..P WKT 2010 09 12 15 59 55 31.3200 -97.3300 251.000 457.0 111.733 3.050 -999.990 -999.990 1.117 ..P WKT 2010 09 12 16 04 55 31.3200 -97.3300 251.000 30.0 101.749 3.660 -999.990 -999.990 1.017 ..P WKT 2010 09 12 16 09 55 31.3200 -97.3300 251.000 122.0 117.387 4.350 -999.990 -999.990 1.174 ..P WKT 2010 09 12 16 14 55 31.3200 -97.3300 251.000 457.0 105.476 2.640 -999.990 -999.990 1.055 ..P WKT 2010 09 12 16 24 55 31.3200 -97.3300 251.000 30.0 100.959 2.750 -999.990 -999.990 1.010 ..P WKT 2010 09 12 16 29 55 31.3200 -97.3300 251.000 122.0 113.581 3.170 -999.990 -999.990 1.136 ..P WKT 2010 09 12 16 34 55 31.3200 -97.3300 251.000 457.0 109.405 3.580 -999.990 -999.990 1.094 ..P WKT 2010 09 12 16 39 55 31.3200 -97.3300 251.000 30.0 105.780 3.290 -999.990 -999.990 1.058 ..P WKT 2010 09 12 16 44 55 31.3200 -97.3300 251.000 122.0 118.399 4.390 -999.990 -999.990 1.184 ..P WKT 2010 09 12 16 49 55 31.3200 -97.3300 251.000 457.0 115.600 3.740 -999.990 -999.990 1.156 ..P WKT 2010 09 12 17 04 55 31.3200 -97.3300 251.000 30.0 119.187 4.150 -999.990 -999.990 1.192 ..P WKT 2010 09 12 17 09 55 31.3200 -97.3300 251.000 122.0 110.545 3.740 -999.990 -999.990 1.105 ..P WKT 2010 09 12 17 14 55 31.3200 -97.3300 251.000 457.0 104.105 4.230 -999.990 -999.990 1.041 ..P WKT 2010 09 12 17 19 55 31.3200 -97.3300 251.000 30.0 105.372 3.850 -999.990 -999.990 1.054 ..P WKT 2010 09 12 17 24 55 31.3200 -97.3300 251.000 122.0 108.014 4.610 -999.990 -999.990 1.080 ..P WKT 2010 09 12 17 29 55 31.3200 -97.3300 251.000 457.0 107.354 4.230 -999.990 -999.990 1.074 ..P WKT 2010 09 12 17 39 55 31.3200 -97.3300 251.000 30.0 100.852 4.020 -999.990 -999.990 1.009 ..P WKT 2010 09 12 17 44 55 31.3200 -97.3300 251.000 122.0 122.518 4.580 -999.990 -999.990 1.225 ..P WKT 2010 09 12 17 49 55 31.3200 -97.3300 251.000 457.0 113.100 4.320 -999.990 -999.990 1.131 ..P WKT 2010 09 12 17 54 55 31.3200 -97.3300 251.000 30.0 112.209 4.590 -999.990 -999.990 1.122 ..P WKT 2010 09 12 17 59 55 31.3200 -97.3300 251.000 122.0 119.569 3.960 -999.990 -999.990 1.196 ..P WKT 2010 09 12 18 04 55 31.3200 -97.3300 251.000 457.0 110.703 4.400 -999.990 -999.990 1.107 ..P WKT 2010 09 12 18 14 55 31.3200 -97.3300 251.000 30.0 107.567 4.120 -999.990 -999.990 1.076 ..P WKT 2010 09 12 18 19 55 31.3200 -97.3300 251.000 122.0 115.907 5.450 -999.990 -999.990 1.159 ..P WKT 2010 09 12 18 24 55 31.3200 -97.3300 251.000 457.0 112.149 3.560 -999.990 -999.990 1.121 ..P WKT 2010 09 12 18 29 55 31.3200 -97.3300 251.000 30.0 111.141 3.370 -999.990 -999.990 1.111 ..P WKT 2010 09 12 18 34 55 31.3200 -97.3300 251.000 122.0 110.821 3.350 -999.990 -999.990 1.108 ..P WKT 2010 09 12 18 39 55 31.3200 -97.3300 251.000 457.0 110.500 4.010 -999.990 -999.990 1.105 ..P WKT 2010 09 12 18 49 55 31.3200 -97.3300 251.000 30.0 109.820 4.160 -999.990 -999.990 1.098 ..P WKT 2010 09 12 18 54 55 31.3200 -97.3300 251.000 122.0 116.604 3.150 -999.990 -999.990 1.166 ..P WKT 2010 09 12 18 59 55 31.3200 -97.3300 251.000 457.0 111.573 3.490 -999.990 -999.990 1.116 ..P WKT 2010 09 12 19 04 55 31.3200 -97.3300 251.000 30.0 109.289 3.580 -999.990 -999.990 1.093 ..P WKT 2010 09 12 19 09 55 31.3200 -97.3300 251.000 122.0 117.034 3.610 -999.990 -999.990 1.170 ..P WKT 2010 09 12 19 14 55 31.3200 -97.3300 251.000 457.0 105.411 4.040 -999.990 -999.990 1.054 ..P WKT 2010 09 12 19 24 55 31.3200 -97.3300 251.000 30.0 109.028 3.020 -999.990 -999.990 1.090 ..P WKT 2010 09 12 19 29 55 31.3200 -97.3300 251.000 122.0 122.617 3.200 -999.990 -999.990 1.226 ..P WKT 2010 09 12 19 34 55 31.3200 -97.3300 251.000 457.0 106.681 3.040 -999.990 -999.990 1.067 ..P WKT 2010 09 12 19 39 55 31.3200 -97.3300 251.000 30.0 108.460 3.040 -999.990 -999.990 1.085 ..P WKT 2010 09 12 19 44 55 31.3200 -97.3300 251.000 122.0 113.945 4.240 -999.990 -999.990 1.139 ..P WKT 2010 09 12 19 49 55 31.3200 -97.3300 251.000 457.0 112.017 4.240 -999.990 -999.990 1.120 ..P WKT 2010 09 12 19 59 55 31.3200 -97.3300 251.000 30.0 108.238 2.710 -999.990 -999.990 1.082 ..P WKT 2010 09 12 20 04 55 31.3200 -97.3300 251.000 122.0 116.546 4.460 -999.990 -999.990 1.165 ..P WKT 2010 09 12 20 09 55 31.3200 -97.3300 251.000 457.0 108.108 4.110 -999.990 -999.990 1.081 ..P WKT 2010 09 12 20 14 55 31.3200 -97.3300 251.000 30.0 98.849 3.770 -999.990 -999.990 0.988 ..P WKT 2010 09 12 20 19 55 31.3200 -97.3300 251.000 122.0 108.252 3.300 -999.990 -999.990 1.083 ..P WKT 2010 09 12 20 24 55 31.3200 -97.3300 251.000 457.0 107.226 3.840 -999.990 -999.990 1.072 ..P WKT 2010 09 12 20 34 55 31.3200 -97.3300 251.000 30.0 100.864 3.290 -999.990 -999.990 1.009 ..P WKT 2010 09 12 20 39 55 31.3200 -97.3300 251.000 122.0 109.794 3.960 -999.990 -999.990 1.098 ..P WKT 2010 09 12 20 44 55 31.3200 -97.3300 251.000 457.0 111.865 3.000 -999.990 -999.990 1.119 ..P WKT 2010 09 12 20 49 55 31.3200 -97.3300 251.000 30.0 113.112 3.040 -999.990 -999.990 1.131 ..P WKT 2010 09 12 20 54 55 31.3200 -97.3300 251.000 122.0 117.651 3.210 -999.990 -999.990 1.177 ..P WKT 2010 09 12 20 59 55 31.3200 -97.3300 251.000 457.0 115.058 2.830 -999.990 -999.990 1.151 ..P WKT 2010 09 12 21 09 55 31.3200 -97.3300 251.000 30.0 109.285 3.400 -999.990 -999.990 1.093 ..P WKT 2010 09 12 21 14 55 31.3200 -97.3300 251.000 122.0 125.849 2.890 -999.990 -999.990 1.258 ..P WKT 2010 09 12 21 19 55 31.3200 -97.3300 251.000 457.0 121.023 3.320 -999.990 -999.990 1.210 ..P WKT 2010 09 12 21 24 55 31.3200 -97.3300 251.000 30.0 110.441 2.930 -999.990 -999.990 1.104 ..P WKT 2010 09 12 21 29 55 31.3200 -97.3300 251.000 122.0 121.244 2.510 -999.990 -999.990 1.212 ..P WKT 2010 09 12 21 34 55 31.3200 -97.3300 251.000 457.0 115.323 2.690 -999.990 -999.990 1.153 ..P WKT 2010 09 12 21 44 55 31.3200 -97.3300 251.000 30.0 105.443 2.630 -999.990 -999.990 1.054 ..P WKT 2010 09 12 21 49 55 31.3200 -97.3300 251.000 122.0 117.515 2.280 -999.990 -999.990 1.175 ..P WKT 2010 09 12 21 54 55 31.3200 -97.3300 251.000 457.0 111.361 2.840 -999.990 -999.990 1.114 ..P WKT 2010 09 12 21 59 55 31.3200 -97.3300 251.000 30.0 110.141 2.430 -999.990 -999.990 1.101 ..P WKT 2010 09 12 22 04 55 31.3200 -97.3300 251.000 122.0 115.634 2.670 -999.990 -999.990 1.156 ..P WKT 2010 09 12 22 09 55 31.3200 -97.3300 251.000 457.0 110.852 2.270 -999.990 -999.990 1.109 ..P WKT 2010 09 12 22 19 55 31.3200 -97.3300 251.000 30.0 104.460 2.620 -999.990 -999.990 1.045 ..P WKT 2010 09 12 22 24 55 31.3200 -97.3300 251.000 122.0 112.436 3.370 -999.990 -999.990 1.124 ..P WKT 2010 09 12 22 29 55 31.3200 -97.3300 251.000 457.0 104.390 3.170 -999.990 -999.990 1.044 ..P WKT 2010 09 12 22 34 55 31.3200 -97.3300 251.000 30.0 103.464 2.890 -999.990 -999.990 1.035 ..P WKT 2010 09 12 22 39 55 31.3200 -97.3300 251.000 122.0 116.916 4.560 -999.990 -999.990 1.169 ..P WKT 2010 09 12 22 44 55 31.3200 -97.3300 251.000 457.0 105.721 4.500 -999.990 -999.990 1.057 ..P WKT 2010 09 12 22 54 55 31.3200 -97.3300 251.000 30.0 120.903 4.210 -999.990 -999.990 1.209 ..P WKT 2010 09 12 22 59 55 31.3200 -97.3300 251.000 122.0 114.697 3.570 -999.990 -999.990 1.147 ..P WKT 2010 09 12 23 04 55 31.3200 -97.3300 251.000 457.0 119.305 3.650 -999.990 -999.990 1.193 ..P WKT 2010 09 12 23 09 55 31.3200 -97.3300 251.000 30.0 112.416 3.620 -999.990 -999.990 1.124 ..P WKT 2010 09 12 23 14 55 31.3200 -97.3300 251.000 122.0 119.760 5.020 -999.990 -999.990 1.198 ..P WKT 2010 09 12 23 19 55 31.3200 -97.3300 251.000 457.0 116.155 3.930 -999.990 -999.990 1.162 ..P WKT 2010 09 12 23 29 55 31.3200 -97.3300 251.000 30.0 110.852 4.250 -999.990 -999.990 1.109 ..P WKT 2010 09 12 23 34 55 31.3200 -97.3300 251.000 122.0 120.645 5.050 -999.990 -999.990 1.206 ..P WKT 2010 09 12 23 39 55 31.3200 -97.3300 251.000 457.0 111.284 4.410 -999.990 -999.990 1.113 ..P WKT 2010 09 12 23 44 55 31.3200 -97.3300 251.000 30.0 115.603 3.430 -999.990 -999.990 1.156 ..P WKT 2010 09 12 23 49 55 31.3200 -97.3300 251.000 122.0 117.049 3.430 -999.990 -999.990 1.170 ..P WKT 2010 09 13 00 09 55 31.3200 -97.3300 251.000 457.0 104.910 3.660 -999.990 -999.990 1.049 ..P WKT 2010 09 13 00 10 25 31.3200 -97.3300 251.000 457.0 100.517 3.260 -999.990 -999.990 1.005 ..P WKT 2010 09 13 00 10 55 31.3200 -97.3300 251.000 457.0 96.945 3.430 -999.990 -999.990 0.969 ..P WKT 2010 09 13 00 11 25 31.3200 -97.3300 251.000 457.0 106.505 4.920 -999.990 -999.990 1.065 ..P WKT 2010 09 13 00 11 55 31.3200 -97.3300 251.000 457.0 108.405 3.050 -999.990 -999.990 1.084 ..P WKT 2010 09 13 00 12 25 31.3200 -97.3300 251.000 457.0 109.758 3.290 -999.990 -999.990 1.098 ..P WKT 2010 09 13 00 12 55 31.3200 -97.3300 251.000 457.0 104.271 4.260 -999.990 -999.990 1.043 ..P WKT 2010 09 13 00 13 25 31.3200 -97.3300 251.000 457.0 103.708 3.050 -999.990 -999.990 1.037 ..P WKT 2010 09 13 00 13 55 31.3200 -97.3300 251.000 457.0 103.147 3.260 -999.990 -999.990 1.031 ..P WKT 2010 09 13 00 14 25 31.3200 -97.3300 251.000 457.0 103.405 3.170 -999.990 -999.990 1.034 ..P WKT 2010 09 13 00 14 55 31.3200 -97.3300 251.000 457.0 101.748 2.940 -999.990 -999.990 1.017 ..P WKT 2010 09 13 00 19 55 31.3200 -97.3300 251.000 30.0 112.266 3.460 -999.990 -999.990 1.123 ..P WKT 2010 09 13 00 24 55 31.3200 -97.3300 251.000 122.0 111.568 3.540 -999.990 -999.990 1.116 ..P WKT 2010 09 13 00 29 55 31.3200 -97.3300 251.000 457.0 104.028 2.960 -999.990 -999.990 1.040 ..P WKT 2010 09 13 00 34 55 31.3200 -97.3300 251.000 30.0 108.528 3.030 -999.990 -999.990 1.085 ..P WKT 2010 09 13 00 39 55 31.3200 -97.3300 251.000 122.0 111.387 3.410 -999.990 -999.990 1.114 ..P WKT 2010 09 13 00 44 55 31.3200 -97.3300 251.000 457.0 102.751 2.960 -999.990 -999.990 1.028 ..P WKT 2010 09 13 00 54 55 31.3200 -97.3300 251.000 30.0 115.395 3.330 -999.990 -999.990 1.154 ..P WKT 2010 09 13 00 59 55 31.3200 -97.3300 251.000 122.0 108.210 3.140 -999.990 -999.990 1.082 ..P WKT 2010 09 13 01 04 55 31.3200 -97.3300 251.000 457.0 104.034 3.180 -999.990 -999.990 1.040 ..P WKT 2010 09 13 01 09 55 31.3200 -97.3300 251.000 30.0 113.547 4.620 -999.990 -999.990 1.135 ..P WKT 2010 09 13 01 14 55 31.3200 -97.3300 251.000 122.0 106.907 3.730 -999.990 -999.990 1.069 ..P WKT 2010 09 13 01 19 55 31.3200 -97.3300 251.000 457.0 101.909 3.670 -999.990 -999.990 1.019 ..P WKT 2010 09 13 01 29 55 31.3200 -97.3300 251.000 30.0 118.983 3.790 -999.990 -999.990 1.190 ..P WKT 2010 09 13 01 34 55 31.3200 -97.3300 251.000 122.0 106.279 3.750 -999.990 -999.990 1.063 ..P WKT 2010 09 13 01 39 55 31.3200 -97.3300 251.000 457.0 99.597 4.000 -999.990 -999.990 0.996 ..P WKT 2010 09 13 01 44 55 31.3200 -97.3300 251.000 30.0 120.990 4.090 -999.990 -999.990 1.210 ..P WKT 2010 09 13 01 49 55 31.3200 -97.3300 251.000 122.0 107.460 3.810 -999.990 -999.990 1.075 ..P WKT 2010 09 13 01 54 55 31.3200 -97.3300 251.000 457.0 100.915 3.970 -999.990 -999.990 1.009 ..P WKT 2010 09 13 02 04 55 31.3200 -97.3300 251.000 30.0 121.323 4.960 -999.990 -999.990 1.213 ..P WKT 2010 09 13 02 09 55 31.3200 -97.3300 251.000 122.0 106.362 3.850 -999.990 -999.990 1.064 ..P WKT 2010 09 13 02 14 55 31.3200 -97.3300 251.000 457.0 91.811 4.110 -999.990 -999.990 0.918 ..P WKT 2010 09 13 02 19 55 31.3200 -97.3300 251.000 30.0 127.539 4.000 -999.990 -999.990 1.275 ..P WKT 2010 09 13 02 24 55 31.3200 -97.3300 251.000 122.0 108.602 4.900 -999.990 -999.990 1.086 ..P WKT 2010 09 13 02 29 55 31.3200 -97.3300 251.000 457.0 99.254 4.020 -999.990 -999.990 0.993 ..P WKT 2010 09 13 02 39 55 31.3200 -97.3300 251.000 30.0 122.823 4.080 -999.990 -999.990 1.228 ..P WKT 2010 09 13 02 44 55 31.3200 -97.3300 251.000 122.0 112.712 4.760 -999.990 -999.990 1.127 ..P WKT 2010 09 13 02 49 55 31.3200 -97.3300 251.000 457.0 106.299 4.840 -999.990 -999.990 1.063 ..P WKT 2010 09 13 02 54 55 31.3200 -97.3300 251.000 30.0 109.754 5.770 -999.990 -999.990 1.098 ..P WKT 2010 09 13 02 59 55 31.3200 -97.3300 251.000 122.0 113.896 5.430 -999.990 -999.990 1.139 ..P WKT 2010 09 13 03 04 55 31.3200 -97.3300 251.000 457.0 108.167 4.550 -999.990 -999.990 1.082 ..P WKT 2010 09 13 03 14 55 31.3200 -97.3300 251.000 30.0 113.612 4.890 -999.990 -999.990 1.136 ..P WKT 2010 09 13 03 19 55 31.3200 -97.3300 251.000 122.0 112.720 5.280 -999.990 -999.990 1.127 ..P WKT 2010 09 13 03 24 55 31.3200 -97.3300 251.000 457.0 105.247 6.530 -999.990 -999.990 1.052 ..P WKT 2010 09 13 03 29 55 31.3200 -97.3300 251.000 30.0 113.406 5.260 -999.990 -999.990 1.134 ..P WKT 2010 09 13 03 34 55 31.3200 -97.3300 251.000 122.0 113.200 4.700 -999.990 -999.990 1.132 ..P WKT 2010 09 13 03 39 55 31.3200 -97.3300 251.000 457.0 99.691 4.130 -999.990 -999.990 0.997 ..P WKT 2010 09 13 03 49 55 31.3200 -97.3300 251.000 30.0 113.464 4.600 -999.990 -999.990 1.135 ..P WKT 2010 09 13 03 54 55 31.3200 -97.3300 251.000 122.0 104.539 4.820 -999.990 -999.990 1.045 ..P WKT 2010 09 13 03 59 55 31.3200 -97.3300 251.000 457.0 100.276 5.980 -999.990 -999.990 1.003 ..P WKT 2010 09 13 04 04 55 31.3200 -97.3300 251.000 30.0 117.413 5.500 -999.990 -999.990 1.174 ..P WKT 2010 09 13 04 09 55 31.3200 -97.3300 251.000 122.0 110.132 5.130 -999.990 -999.990 1.101 ..P WKT 2010 09 13 04 14 55 31.3200 -97.3300 251.000 457.0 108.064 4.880 -999.990 -999.990 1.081 ..P WKT 2010 09 13 04 24 55 31.3200 -97.3300 251.000 30.0 113.257 5.000 -999.990 -999.990 1.133 ..P WKT 2010 09 13 04 29 55 31.3200 -97.3300 251.000 122.0 123.814 5.120 -999.990 -999.990 1.238 ..P WKT 2010 09 13 04 34 55 31.3200 -97.3300 251.000 457.0 91.556 5.480 -999.990 -999.990 0.916 ..P WKT 2010 09 13 04 39 55 31.3200 -97.3300 251.000 30.0 114.189 6.070 -999.990 -999.990 1.142 ..P WKT 2010 09 13 04 44 55 31.3200 -97.3300 251.000 122.0 116.787 5.810 -999.990 -999.990 1.168 ..P WKT 2010 09 13 04 49 55 31.3200 -97.3300 251.000 457.0 96.052 4.860 -999.990 -999.990 0.961 ..P WKT 2010 09 13 05 04 55 31.3200 -97.3300 251.000 30.0 105.555 5.380 -999.990 -999.990 1.056 ..P WKT 2010 09 13 05 09 55 31.3200 -97.3300 251.000 122.0 116.011 7.600 -999.990 -999.990 1.160 ..P WKT 2010 09 13 05 14 55 31.3200 -97.3300 251.000 457.0 87.202 6.150 -999.990 -999.990 0.872 ..P WKT 2010 09 13 05 19 55 31.3200 -97.3300 251.000 30.0 113.584 4.960 -999.990 -999.990 1.136 ..P WKT 2010 09 13 05 24 55 31.3200 -97.3300 251.000 122.0 110.859 4.980 -999.990 -999.990 1.109 ..P WKT 2010 09 13 05 29 55 31.3200 -97.3300 251.000 457.0 92.756 5.070 -999.990 -999.990 0.928 ..P WKT 2010 09 13 05 39 55 31.3200 -97.3300 251.000 30.0 121.390 5.360 -999.990 -999.990 1.214 ..P WKT 2010 09 13 05 44 55 31.3200 -97.3300 251.000 122.0 112.786 5.260 -999.990 -999.990 1.128 ..P WKT 2010 09 13 05 49 55 31.3200 -97.3300 251.000 457.0 87.290 4.870 -999.990 -999.990 0.873 ..P WKT 2010 09 13 05 54 55 31.3200 -97.3300 251.000 30.0 121.675 5.130 -999.990 -999.990 1.217 ..P WKT 2010 09 13 05 59 55 31.3200 -97.3300 251.000 122.0 110.873 5.430 -999.990 -999.990 1.109 ..P WKT 2010 09 13 06 04 55 31.3200 -97.3300 251.000 457.0 92.790 5.100 -999.990 -999.990 0.928 ..P WKT 2010 09 13 06 14 55 31.3200 -97.3300 251.000 30.0 116.457 4.970 -999.990 -999.990 1.165 ..P WKT 2010 09 13 06 19 55 31.3200 -97.3300 251.000 122.0 102.159 5.700 -999.990 -999.990 1.022 ..P WKT 2010 09 13 06 24 55 31.3200 -97.3300 251.000 457.0 89.508 5.040 -999.990 -999.990 0.895 ..P WKT 2010 09 13 06 29 55 31.3200 -97.3300 251.000 30.0 111.894 5.230 -999.990 -999.990 1.119 ..P WKT 2010 09 13 06 34 55 31.3200 -97.3300 251.000 122.0 114.770 6.330 -999.990 -999.990 1.148 ..P WKT 2010 09 13 06 39 55 31.3200 -97.3300 251.000 457.0 90.987 5.420 -999.990 -999.990 0.910 ..P WKT 2010 09 13 06 49 55 31.3200 -97.3300 251.000 30.0 116.115 5.640 -999.990 -999.990 1.161 ..P WKT 2010 09 13 06 54 55 31.3200 -97.3300 251.000 122.0 154.040 15.620 -999.990 -999.990 1.540 ..P WKT 2010 09 13 06 59 55 31.3200 -97.3300 251.000 457.0 94.242 6.240 -999.990 -999.990 0.942 ..P WKT 2010 09 13 07 04 55 31.3200 -97.3300 251.000 30.0 115.124 6.670 -999.990 -999.990 1.151 ..P WKT 2010 09 13 07 09 55 31.3200 -97.3300 251.000 122.0 121.025 8.640 -999.990 -999.990 1.210 ..P WKT 2010 09 13 07 14 55 31.3200 -97.3300 251.000 457.0 92.422 5.360 -999.990 -999.990 0.924 ..P WKT 2010 09 13 07 24 55 31.3200 -97.3300 251.000 30.0 110.175 5.970 -999.990 -999.990 1.102 ..P WKT 2010 09 13 07 29 55 31.3200 -97.3300 251.000 122.0 127.392 5.770 -999.990 -999.990 1.274 ..P WKT 2010 09 13 07 34 55 31.3200 -97.3300 251.000 457.0 99.647 5.640 -999.990 -999.990 0.996 ..P WKT 2010 09 13 07 39 55 31.3200 -97.3300 251.000 30.0 118.652 5.730 -999.990 -999.990 1.187 ..P WKT 2010 09 13 07 44 55 31.3200 -97.3300 251.000 122.0 115.381 6.230 -999.990 -999.990 1.154 ..P WKT 2010 09 13 07 49 55 31.3200 -97.3300 251.000 457.0 103.034 6.850 -999.990 -999.990 1.030 ..P WKT 2010 09 13 07 59 55 31.3200 -97.3300 251.000 30.0 112.190 5.710 -999.990 -999.990 1.122 ..P WKT 2010 09 13 08 04 55 31.3200 -97.3300 251.000 122.0 115.265 5.670 -999.990 -999.990 1.153 ..P WKT 2010 09 13 08 09 55 31.3200 -97.3300 251.000 457.0 97.157 5.770 -999.990 -999.990 0.972 ..P WKT 2010 09 13 08 14 55 31.3200 -97.3300 251.000 30.0 118.115 5.860 -999.990 -999.990 1.181 ..P WKT 2010 09 13 08 19 55 31.3200 -97.3300 251.000 122.0 116.789 6.060 -999.990 -999.990 1.168 ..P WKT 2010 09 13 08 24 55 31.3200 -97.3300 251.000 457.0 98.954 5.850 -999.990 -999.990 0.990 ..P WKT 2010 09 13 08 34 55 31.3200 -97.3300 251.000 30.0 114.264 7.640 -999.990 -999.990 1.143 ..P WKT 2010 09 13 08 39 55 31.3200 -97.3300 251.000 122.0 112.466 5.800 -999.990 -999.990 1.125 ..P WKT 2010 09 13 08 44 55 31.3200 -97.3300 251.000 457.0 102.686 6.260 -999.990 -999.990 1.027 ..P WKT 2010 09 13 08 49 55 31.3200 -97.3300 251.000 30.0 117.126 6.200 -999.990 -999.990 1.171 ..P WKT 2010 09 13 08 54 55 31.3200 -97.3300 251.000 122.0 108.721 8.570 -999.990 -999.990 1.087 ..P WKT 2010 09 13 08 59 55 31.3200 -97.3300 251.000 457.0 104.171 6.270 -999.990 -999.990 1.042 ..P WKT 2010 09 13 09 09 55 31.3200 -97.3300 251.000 30.0 115.830 6.120 -999.990 -999.990 1.158 ..P WKT 2010 09 13 09 14 55 31.3200 -97.3300 251.000 122.0 108.918 6.640 -999.990 -999.990 1.089 ..P WKT 2010 09 13 09 19 55 31.3200 -97.3300 251.000 457.0 95.399 7.120 -999.990 -999.990 0.954 ..P WKT 2010 09 13 09 24 55 31.3200 -97.3300 251.000 30.0 106.106 7.360 -999.990 -999.990 1.061 ..P WKT 2010 09 13 09 29 55 31.3200 -97.3300 251.000 122.0 104.975 7.020 -999.990 -999.990 1.050 ..P WKT 2010 09 13 09 34 55 31.3200 -97.3300 251.000 457.0 94.207 6.770 -999.990 -999.990 0.942 ..P WKT 2010 09 13 09 44 55 31.3200 -97.3300 251.000 30.0 108.781 6.760 -999.990 -999.990 1.088 ..P WKT 2010 09 13 09 49 55 31.3200 -97.3300 251.000 122.0 99.841 7.160 -999.990 -999.990 0.998 ..P WKT 2010 09 13 09 54 55 31.3200 -97.3300 251.000 457.0 111.417 8.010 -999.990 -999.990 1.114 ..P WKT 2010 09 13 09 59 55 31.3200 -97.3300 251.000 30.0 112.942 7.190 -999.990 -999.990 1.129 ..P WKT 2010 09 13 10 04 55 31.3200 -97.3300 251.000 122.0 107.168 6.950 -999.990 -999.990 1.072 ..P WKT 2010 09 13 10 09 55 31.3200 -97.3300 251.000 457.0 113.513 8.070 -999.990 -999.990 1.135 ..P WKT 2010 09 13 10 19 55 31.3200 -97.3300 251.000 30.0 123.234 6.880 -999.990 -999.990 1.232 ..P WKT 2010 09 13 10 24 55 31.3200 -97.3300 251.000 122.0 107.326 7.230 -999.990 -999.990 1.073 ..P WKT 2010 09 13 10 29 55 31.3200 -97.3300 251.000 457.0 106.292 7.460 -999.990 -999.990 1.063 ..P WKT 2010 09 13 10 34 55 31.3200 -97.3300 251.000 30.0 113.387 7.080 -999.990 -999.990 1.134 ..P WKT 2010 09 13 10 39 55 31.3200 -97.3300 251.000 122.0 106.706 6.940 -999.990 -999.990 1.067 ..P WKT 2010 09 13 10 44 55 31.3200 -97.3300 251.000 457.0 103.606 7.010 -999.990 -999.990 1.036 ..P WKT 2010 09 13 10 54 55 31.3200 -97.3300 251.000 30.0 112.090 7.060 -999.990 -999.990 1.121 ..P WKT 2010 09 13 10 59 55 31.3200 -97.3300 251.000 122.0 105.348 7.110 -999.990 -999.990 1.053 ..P WKT 2010 09 13 11 04 55 31.3200 -97.3300 251.000 457.0 100.673 7.310 -999.990 -999.990 1.007 ..P WKT 2010 09 13 11 09 55 31.3200 -97.3300 251.000 30.0 109.226 7.210 -999.990 -999.990 1.092 ..P WKT 2010 09 13 11 14 55 31.3200 -97.3300 251.000 122.0 98.487 7.170 -999.990 -999.990 0.985 ..P WKT 2010 09 13 11 19 55 31.3200 -97.3300 251.000 457.0 100.289 7.020 -999.990 -999.990 1.003 ..P WKT 2010 09 13 11 29 55 31.3200 -97.3300 251.000 30.0 112.725 7.200 -999.990 -999.990 1.127 ..P WKT 2010 09 13 11 34 55 31.3200 -97.3300 251.000 122.0 116.330 7.210 -999.990 -999.990 1.163 ..P WKT 2010 09 13 11 39 55 31.3200 -97.3300 251.000 457.0 100.089 8.540 -999.990 -999.990 1.001 ..P WKT 2010 09 13 11 44 55 31.3200 -97.3300 251.000 30.0 122.992 7.260 -999.990 -999.990 1.230 ..P WKT 2010 09 13 11 49 55 31.3200 -97.3300 251.000 122.0 114.469 7.390 -999.990 -999.990 1.145 ..P WKT 2010 09 13 12 09 55 31.3200 -97.3300 251.000 457.0 103.805 7.600 -999.990 -999.990 1.038 ..P WKT 2010 09 13 12 10 25 31.3200 -97.3300 251.000 457.0 106.830 7.670 -999.990 -999.990 1.068 ..P WKT 2010 09 13 12 10 55 31.3200 -97.3300 251.000 457.0 99.930 7.890 -999.990 -999.990 0.999 ..P WKT 2010 09 13 12 11 25 31.3200 -97.3300 251.000 457.0 94.409 7.840 -999.990 -999.990 0.944 ..P WKT 2010 09 13 12 11 55 31.3200 -97.3300 251.000 457.0 103.775 7.570 -999.990 -999.990 1.038 ..P WKT 2010 09 13 12 12 25 31.3200 -97.3300 251.000 457.0 105.974 7.430 -999.990 -999.990 1.060 ..P WKT 2010 09 13 12 12 55 31.3200 -97.3300 251.000 457.0 102.106 7.380 -999.990 -999.990 1.021 ..P WKT 2010 09 13 12 13 25 31.3200 -97.3300 251.000 457.0 107.889 7.470 -999.990 -999.990 1.079 ..P WKT 2010 09 13 12 13 55 31.3200 -97.3300 251.000 457.0 112.292 8.240 -999.990 -999.990 1.123 ..P WKT 2010 09 13 12 14 25 31.3200 -97.3300 251.000 457.0 116.420 8.100 -999.990 -999.990 1.164 ..P WKT 2010 09 13 12 14 55 31.3200 -97.3300 251.000 457.0 114.759 7.350 -999.990 -999.990 1.148 ..P WKT 2010 09 13 12 19 55 31.3200 -97.3300 251.000 30.0 133.157 8.070 -999.990 -999.990 1.332 ..P WKT 2010 09 13 12 24 55 31.3200 -97.3300 251.000 122.0 117.369 7.280 -999.990 -999.990 1.174 ..P WKT 2010 09 13 12 29 55 31.3200 -97.3300 251.000 457.0 88.072 7.430 -999.990 -999.990 0.881 ..P WKT 2010 09 13 12 34 55 31.3200 -97.3300 251.000 30.0 125.491 7.650 -999.990 -999.990 1.255 ..P WKT 2010 09 13 12 39 55 31.3200 -97.3300 251.000 122.0 114.666 7.700 -999.990 -999.990 1.147 ..P WKT 2010 09 13 12 44 55 31.3200 -97.3300 251.000 457.0 87.576 7.020 -999.990 -999.990 0.876 ..P WKT 2010 09 13 12 54 55 31.3200 -97.3300 251.000 30.0 117.845 7.100 -999.990 -999.990 1.178 ..P WKT 2010 09 13 12 59 55 31.3200 -97.3300 251.000 122.0 116.209 6.950 -999.990 -999.990 1.162 ..P WKT 2010 09 13 13 04 55 31.3200 -97.3300 251.000 457.0 95.553 7.010 -999.990 -999.990 0.956 ..P WKT 2010 09 13 13 09 55 31.3200 -97.3300 251.000 30.0 117.348 7.120 -999.990 -999.990 1.173 ..P WKT 2010 09 13 13 14 55 31.3200 -97.3300 251.000 122.0 115.712 6.820 -999.990 -999.990 1.157 ..P WKT 2010 09 13 13 19 55 31.3200 -97.3300 251.000 457.0 93.678 7.010 -999.990 -999.990 0.937 ..P WKT 2010 09 13 13 29 55 31.3200 -97.3300 251.000 30.0 124.331 7.330 -999.990 -999.990 1.243 ..P WKT 2010 09 13 13 34 55 31.3200 -97.3300 251.000 122.0 116.514 6.720 -999.990 -999.990 1.165 ..P WKT 2010 09 13 13 39 55 31.3200 -97.3300 251.000 457.0 98.911 7.120 -999.990 -999.990 0.989 ..P WKT 2010 09 13 13 44 55 31.3200 -97.3300 251.000 30.0 125.133 6.950 -999.990 -999.990 1.251 ..P WKT 2010 09 13 13 49 55 31.3200 -97.3300 251.000 122.0 114.008 7.250 -999.990 -999.990 1.140 ..P WKT 2010 09 13 13 54 55 31.3200 -97.3300 251.000 457.0 90.894 7.250 -999.990 -999.990 0.909 ..P WKT 2010 09 13 14 04 55 31.3200 -97.3300 251.000 30.0 121.525 7.490 -999.990 -999.990 1.215 ..P WKT 2010 09 13 14 09 55 31.3200 -97.3300 251.000 122.0 115.321 7.030 -999.990 -999.990 1.153 ..P WKT 2010 09 13 14 14 55 31.3200 -97.3300 251.000 457.0 90.653 7.070 -999.990 -999.990 0.907 ..P WKT 2010 09 13 14 19 55 31.3200 -97.3300 251.000 30.0 116.007 7.250 -999.990 -999.990 1.160 ..P WKT 2010 09 13 14 24 55 31.3200 -97.3300 251.000 122.0 125.100 7.120 -999.990 -999.990 1.251 ..P WKT 2010 09 13 14 29 55 31.3200 -97.3300 251.000 457.0 105.945 7.040 -999.990 -999.990 1.059 ..P WKT 2010 09 13 14 39 55 31.3200 -97.3300 251.000 30.0 122.576 6.860 -999.990 -999.990 1.226 ..P WKT 2010 09 13 14 44 55 31.3200 -97.3300 251.000 122.0 125.980 6.830 -999.990 -999.990 1.260 ..P WKT 2010 09 13 14 49 55 31.3200 -97.3300 251.000 457.0 90.803 6.860 -999.990 -999.990 0.908 ..P WKT 2010 09 13 14 54 55 31.3200 -97.3300 251.000 30.0 124.933 6.850 -999.990 -999.990 1.249 ..P WKT 2010 09 13 14 59 55 31.3200 -97.3300 251.000 122.0 127.924 6.660 -999.990 -999.990 1.279 ..P WKT 2010 09 13 15 04 55 31.3200 -97.3300 251.000 457.0 98.122 6.940 -999.990 -999.990 0.981 ..P WKT 2010 09 13 15 14 55 31.3200 -97.3300 251.000 30.0 119.889 7.420 -999.990 -999.990 1.199 ..P WKT 2010 09 13 15 19 55 31.3200 -97.3300 251.000 122.0 124.060 7.010 -999.990 -999.990 1.241 ..P WKT 2010 09 13 15 24 55 31.3200 -97.3300 251.000 457.0 101.777 7.020 -999.990 -999.990 1.018 ..P WKT 2010 09 13 15 29 55 31.3200 -97.3300 251.000 30.0 122.206 6.520 -999.990 -999.990 1.222 ..P WKT 2010 09 13 15 34 55 31.3200 -97.3300 251.000 122.0 129.408 6.530 -999.990 -999.990 1.294 ..P WKT 2010 09 13 15 39 55 31.3200 -97.3300 251.000 457.0 106.576 6.590 -999.990 -999.990 1.066 ..P WKT 2010 09 13 15 49 55 31.3200 -97.3300 251.000 30.0 121.236 6.700 -999.990 -999.990 1.212 ..P WKT 2010 09 13 15 54 55 31.3200 -97.3300 251.000 122.0 127.866 6.740 -999.990 -999.990 1.279 ..P WKT 2010 09 13 15 59 55 31.3200 -97.3300 251.000 457.0 121.547 6.950 -999.990 -999.990 1.215 ..P WKT 2010 09 13 16 04 55 31.3200 -97.3300 251.000 30.0 125.698 7.180 -999.990 -999.990 1.257 ..P WKT 2010 09 13 16 09 55 31.3200 -97.3300 251.000 122.0 125.716 6.480 -999.990 -999.990 1.257 ..P WKT 2010 09 13 16 14 55 31.3200 -97.3300 251.000 457.0 123.806 6.590 -999.990 -999.990 1.238 ..P WKT 2010 09 13 16 24 55 31.3200 -97.3300 251.000 30.0 126.282 6.530 -999.990 -999.990 1.263 ..P WKT 2010 09 13 16 29 55 31.3200 -97.3300 251.000 122.0 125.710 7.280 -999.990 -999.990 1.257 ..P WKT 2010 09 13 16 34 55 31.3200 -97.3300 251.000 457.0 118.250 6.560 -999.990 -999.990 1.183 ..P WKT 2010 09 13 16 39 55 31.3200 -97.3300 251.000 30.0 115.199 7.640 -999.990 -999.990 1.152 ..P WKT 2010 09 13 16 44 55 31.3200 -97.3300 251.000 122.0 125.095 7.150 -999.990 -999.990 1.251 ..P WKT 2010 09 13 16 49 55 31.3200 -97.3300 251.000 457.0 115.156 6.370 -999.990 -999.990 1.152 ..P WKT 2010 09 13 17 04 55 31.3200 -97.3300 251.000 30.0 108.526 6.270 -999.990 -999.990 1.085 ..P WKT 2010 09 13 17 09 55 31.3200 -97.3300 251.000 122.0 117.618 7.060 -999.990 -999.990 1.176 ..P WKT 2010 09 13 17 14 55 31.3200 -97.3300 251.000 457.0 111.559 7.310 -999.990 -999.990 1.116 ..P WKT 2010 09 13 17 19 55 31.3200 -97.3300 251.000 30.0 106.050 6.550 -999.990 -999.990 1.060 ..P WKT 2010 09 13 17 24 55 31.3200 -97.3300 251.000 122.0 110.459 7.100 -999.990 -999.990 1.105 ..P WKT 2010 09 13 17 29 55 31.3200 -97.3300 251.000 457.0 117.759 6.540 -999.990 -999.990 1.178 ..P WKT 2010 09 13 17 39 55 31.3200 -97.3300 251.000 30.0 113.548 6.660 -999.990 -999.990 1.135 ..P WKT 2010 09 13 17 44 55 31.3200 -97.3300 251.000 122.0 118.427 6.000 -999.990 -999.990 1.184 ..P WKT 2010 09 13 17 49 55 31.3200 -97.3300 251.000 457.0 112.424 6.410 -999.990 -999.990 1.124 ..P WKT 2010 09 13 17 54 55 31.3200 -97.3300 251.000 30.0 115.512 6.240 -999.990 -999.990 1.155 ..P WKT 2010 09 13 17 59 55 31.3200 -97.3300 251.000 122.0 120.802 6.120 -999.990 -999.990 1.208 ..P WKT 2010 09 13 18 04 55 31.3200 -97.3300 251.000 457.0 122.237 7.620 -999.990 -999.990 1.222 ..P WKT 2010 09 13 18 14 55 31.3200 -97.3300 251.000 30.0 115.349 6.880 -999.990 -999.990 1.153 ..P WKT 2010 09 13 18 19 55 31.3200 -97.3300 251.000 122.0 119.970 5.990 -999.990 -999.990 1.200 ..P WKT 2010 09 13 18 24 55 31.3200 -97.3300 251.000 457.0 114.815 6.010 -999.990 -999.990 1.148 ..P WKT 2010 09 13 18 29 55 31.3200 -97.3300 251.000 30.0 114.342 6.030 -999.990 -999.990 1.143 ..P WKT 2010 09 13 18 34 55 31.3200 -97.3300 251.000 122.0 117.310 6.160 -999.990 -999.990 1.173 ..P WKT 2010 09 13 18 39 55 31.3200 -97.3300 251.000 457.0 116.974 6.020 -999.990 -999.990 1.170 ..P WKT 2010 09 13 18 49 55 31.3200 -97.3300 251.000 30.0 109.851 6.080 -999.990 -999.990 1.099 ..P WKT 2010 09 13 18 54 55 31.3200 -97.3300 251.000 122.0 122.202 6.070 -999.990 -999.990 1.222 ..P WKT 2010 09 13 18 59 55 31.3200 -97.3300 251.000 457.0 111.835 5.870 -999.990 -999.990 1.118 ..P WKT 2010 09 13 19 04 55 31.3200 -97.3300 251.000 30.0 110.142 5.680 -999.990 -999.990 1.101 ..P WKT 2010 09 13 19 09 55 31.3200 -97.3300 251.000 122.0 119.326 6.400 -999.990 -999.990 1.193 ..P WKT 2010 09 13 19 14 55 31.3200 -97.3300 251.000 457.0 115.705 5.880 -999.990 -999.990 1.157 ..P WKT 2010 09 13 19 24 55 31.3200 -97.3300 251.000 30.0 118.043 6.560 -999.990 -999.990 1.180 ..P WKT 2010 09 13 19 29 55 31.3200 -97.3300 251.000 122.0 118.494 6.200 -999.990 -999.990 1.185 ..P WKT 2010 09 13 19 34 55 31.3200 -97.3300 251.000 457.0 113.163 7.420 -999.990 -999.990 1.132 ..P WKT 2010 09 13 19 39 55 31.3200 -97.3300 251.000 30.0 111.136 6.130 -999.990 -999.990 1.111 ..P WKT 2010 09 13 19 44 55 31.3200 -97.3300 251.000 122.0 120.672 6.500 -999.990 -999.990 1.207 ..P WKT 2010 09 13 19 49 55 31.3200 -97.3300 251.000 457.0 116.718 6.450 -999.990 -999.990 1.167 ..P WKT 2010 09 13 19 59 55 31.3200 -97.3300 251.000 30.0 110.895 6.150 -999.990 -999.990 1.109 ..P WKT 2010 09 13 20 04 55 31.3200 -97.3300 251.000 122.0 114.256 6.240 -999.990 -999.990 1.143 ..P WKT 2010 09 13 20 09 55 31.3200 -97.3300 251.000 457.0 109.083 6.150 -999.990 -999.990 1.091 ..P WKT 2010 09 13 20 14 55 31.3200 -97.3300 251.000 30.0 105.011 6.090 -999.990 -999.990 1.050 ..P WKT 2010 09 13 20 19 55 31.3200 -97.3300 251.000 122.0 108.923 5.660 -999.990 -999.990 1.089 ..P WKT 2010 09 13 20 24 55 31.3200 -97.3300 251.000 457.0 100.172 5.250 -999.990 -999.990 1.002 ..P WKT 2010 09 13 20 34 55 31.3200 -97.3300 251.000 30.0 98.517 6.830 -999.990 -999.990 0.985 ..P WKT 2010 09 13 20 39 55 31.3200 -97.3300 251.000 122.0 109.744 5.790 -999.990 -999.990 1.097 ..P WKT 2010 09 13 20 44 55 31.3200 -97.3300 251.000 457.0 102.251 6.060 -999.990 -999.990 1.023 ..P WKT 2010 09 13 20 49 55 31.3200 -97.3300 251.000 30.0 103.843 5.570 -999.990 -999.990 1.038 ..P WKT 2010 09 13 20 54 55 31.3200 -97.3300 251.000 122.0 110.664 5.750 -999.990 -999.990 1.107 ..P WKT 2010 09 13 20 59 55 31.3200 -97.3300 251.000 457.0 105.649 5.100 -999.990 -999.990 1.056 ..P WKT 2010 09 13 21 09 55 31.3200 -97.3300 251.000 30.0 102.993 5.190 -999.990 -999.990 1.030 ..P WKT 2010 09 13 21 14 55 31.3200 -97.3300 251.000 122.0 109.204 5.870 -999.990 -999.990 1.092 ..P WKT 2010 09 13 21 19 55 31.3200 -97.3300 251.000 457.0 110.186 5.230 -999.990 -999.990 1.102 ..P WKT 2010 09 13 21 24 55 31.3200 -97.3300 251.000 30.0 108.140 5.330 -999.990 -999.990 1.081 ..P WKT 2010 09 13 21 29 55 31.3200 -97.3300 251.000 122.0 119.718 5.910 -999.990 -999.990 1.197 ..P WKT 2010 09 13 21 34 55 31.3200 -97.3300 251.000 457.0 111.479 5.560 -999.990 -999.990 1.115 ..P WKT 2010 09 13 21 44 55 31.3200 -97.3300 251.000 30.0 117.925 5.740 -999.990 -999.990 1.179 ..P WKT 2010 09 13 21 49 55 31.3200 -97.3300 251.000 122.0 123.251 5.590 -999.990 -999.990 1.233 ..P WKT 2010 09 13 21 54 55 31.3200 -97.3300 251.000 457.0 125.550 5.520 -999.990 -999.990 1.256 ..P WKT 2010 09 13 21 59 55 31.3200 -97.3300 251.000 30.0 119.454 5.440 -999.990 -999.990 1.195 ..P WKT 2010 09 13 22 04 55 31.3200 -97.3300 251.000 122.0 128.220 5.740 -999.990 -999.990 1.282 ..P WKT 2010 09 13 22 09 55 31.3200 -97.3300 251.000 457.0 124.051 5.450 -999.990 -999.990 1.241 ..P WKT 2010 09 13 22 19 55 31.3200 -97.3300 251.000 30.0 116.108 4.930 -999.990 -999.990 1.161 ..P WKT 2010 09 13 22 24 55 31.3200 -97.3300 251.000 122.0 121.688 4.980 -999.990 -999.990 1.217 ..P WKT 2010 09 13 22 29 55 31.3200 -97.3300 251.000 457.0 114.336 5.180 -999.990 -999.990 1.143 ..P WKT 2010 09 13 22 34 55 31.3200 -97.3300 251.000 30.0 109.322 5.390 -999.990 -999.990 1.093 ..P WKT 2010 09 13 22 39 55 31.3200 -97.3300 251.000 122.0 118.205 5.230 -999.990 -999.990 1.182 ..P WKT 2010 09 13 22 44 55 31.3200 -97.3300 251.000 457.0 109.340 5.530 -999.990 -999.990 1.093 ..P WKT 2010 09 13 22 54 55 31.3200 -97.3300 251.000 30.0 120.716 6.220 -999.990 -999.990 1.207 ..P WKT 2010 09 13 22 59 55 31.3200 -97.3300 251.000 122.0 114.956 5.150 -999.990 -999.990 1.150 ..P WKT 2010 09 13 23 04 55 31.3200 -97.3300 251.000 457.0 114.837 4.980 -999.990 -999.990 1.148 ..P WKT 2010 09 13 23 09 55 31.3200 -97.3300 251.000 30.0 112.242 4.790 -999.990 -999.990 1.122 ..P WKT 2010 09 13 23 14 55 31.3200 -97.3300 251.000 122.0 118.589 4.830 -999.990 -999.990 1.186 ..P WKT 2010 09 13 23 19 55 31.3200 -97.3300 251.000 457.0 108.152 5.020 -999.990 -999.990 1.082 ..P WKT 2010 09 13 23 29 55 31.3200 -97.3300 251.000 30.0 107.897 4.560 -999.990 -999.990 1.079 ..P WKT 2010 09 13 23 34 55 31.3200 -97.3300 251.000 122.0 119.453 4.390 -999.990 -999.990 1.195 ..P WKT 2010 09 13 23 39 55 31.3200 -97.3300 251.000 457.0 109.825 4.870 -999.990 -999.990 1.098 ..P WKT 2010 09 13 23 44 55 31.3200 -97.3300 251.000 30.0 115.603 4.350 -999.990 -999.990 1.156 ..P WKT 2010 09 13 23 49 55 31.3200 -97.3300 251.000 122.0 117.942 4.340 -999.990 -999.990 1.179 ..P WKT 2010 09 14 00 09 55 31.3200 -97.3300 251.000 457.0 119.843 4.570 -999.990 -999.990 1.198 ..P WKT 2010 09 14 00 10 25 31.3200 -97.3300 251.000 457.0 118.341 4.660 -999.990 -999.990 1.183 ..P WKT 2010 09 14 00 10 55 31.3200 -97.3300 251.000 457.0 115.464 4.560 -999.990 -999.990 1.155 ..P WKT 2010 09 14 00 11 25 31.3200 -97.3300 251.000 457.0 121.113 4.870 -999.990 -999.990 1.211 ..P WKT 2010 09 14 00 11 55 31.3200 -97.3300 251.000 457.0 116.724 5.020 -999.990 -999.990 1.167 ..P WKT 2010 09 14 00 12 25 31.3200 -97.3300 251.000 457.0 115.772 4.510 -999.990 -999.990 1.158 ..P WKT 2010 09 14 00 12 55 31.3200 -97.3300 251.000 457.0 121.697 4.810 -999.990 -999.990 1.217 ..P WKT 2010 09 14 00 13 25 31.3200 -97.3300 251.000 457.0 121.707 4.540 -999.990 -999.990 1.217 ..P WKT 2010 09 14 00 13 55 31.3200 -97.3300 251.000 457.0 119.930 4.460 -999.990 -999.990 1.199 ..P WKT 2010 09 14 00 14 25 31.3200 -97.3300 251.000 457.0 125.442 4.740 -999.990 -999.990 1.254 ..P WKT 2010 09 14 00 14 55 31.3200 -97.3300 251.000 457.0 125.315 4.870 -999.990 -999.990 1.253 ..P WKT 2010 09 14 00 19 55 31.3200 -97.3300 251.000 30.0 112.773 4.790 -999.990 -999.990 1.128 ..P WKT 2010 09 14 00 24 55 31.3200 -97.3300 251.000 122.0 125.945 5.760 -999.990 -999.990 1.259 ..P WKT 2010 09 14 00 29 55 31.3200 -97.3300 251.000 457.0 122.479 4.660 -999.990 -999.990 1.225 ..P WKT 2010 09 14 00 34 55 31.3200 -97.3300 251.000 30.0 122.863 4.810 -999.990 -999.990 1.229 ..P WKT 2010 09 14 00 39 55 31.3200 -97.3300 251.000 122.0 122.422 4.820 -999.990 -999.990 1.224 ..P WKT 2010 09 14 00 44 55 31.3200 -97.3300 251.000 457.0 115.106 5.200 -999.990 -999.990 1.151 ..P WKT 2010 09 14 00 54 55 31.3200 -97.3300 251.000 30.0 129.020 5.060 -999.990 -999.990 1.290 ..P WKT 2010 09 14 00 59 55 31.3200 -97.3300 251.000 122.0 118.354 5.020 -999.990 -999.990 1.184 ..P WKT 2010 09 14 01 04 55 31.3200 -97.3300 251.000 457.0 120.610 5.540 -999.990 -999.990 1.206 ..P WKT 2010 09 14 01 09 55 31.3200 -97.3300 251.000 30.0 118.468 5.100 -999.990 -999.990 1.185 ..P WKT 2010 09 14 01 14 55 31.3200 -97.3300 251.000 122.0 123.747 4.920 -999.990 -999.990 1.237 ..P WKT 2010 09 14 01 19 55 31.3200 -97.3300 251.000 457.0 118.581 5.700 -999.990 -999.990 1.186 ..P WKT 2010 09 14 01 29 55 31.3200 -97.3300 251.000 30.0 119.518 5.440 -999.990 -999.990 1.195 ..P WKT 2010 09 14 01 34 55 31.3200 -97.3300 251.000 122.0 121.499 4.720 -999.990 -999.990 1.215 ..P WKT 2010 09 14 01 39 55 31.3200 -97.3300 251.000 457.0 125.953 4.400 -999.990 -999.990 1.260 ..P WKT 2010 09 14 01 44 55 31.3200 -97.3300 251.000 30.0 119.413 4.140 -999.990 -999.990 1.194 ..P WKT 2010 09 14 01 49 55 31.3200 -97.3300 251.000 122.0 134.859 4.220 -999.990 -999.990 1.349 ..P WKT 2010 09 14 01 54 55 31.3200 -97.3300 251.000 457.0 124.748 3.950 -999.990 -999.990 1.247 ..P WKT 2010 09 14 02 04 55 31.3200 -97.3300 251.000 30.0 115.538 3.930 -999.990 -999.990 1.155 ..P WKT 2010 09 14 02 09 55 31.3200 -97.3300 251.000 122.0 124.957 4.340 -999.990 -999.990 1.250 ..P WKT 2010 09 14 02 14 55 31.3200 -97.3300 251.000 457.0 133.138 4.520 -999.990 -999.990 1.331 ..P WKT 2010 09 14 02 19 55 31.3200 -97.3300 251.000 30.0 139.807 4.840 -999.990 -999.990 1.398 ..P WKT 2010 09 14 02 24 55 31.3200 -97.3300 251.000 122.0 130.542 5.230 -999.990 -999.990 1.305 ..P WKT 2010 09 14 02 29 55 31.3200 -97.3300 251.000 457.0 126.772 4.890 -999.990 -999.990 1.268 ..P WKT 2010 09 14 02 39 55 31.3200 -97.3300 251.000 30.0 132.437 4.260 -999.990 -999.990 1.324 ..P WKT 2010 09 14 02 44 55 31.3200 -97.3300 251.000 122.0 127.039 4.340 -999.990 -999.990 1.270 ..P WKT 2010 09 14 02 49 55 31.3200 -97.3300 251.000 457.0 137.297 4.500 -999.990 -999.990 1.373 ..P WKT 2010 09 14 02 54 55 31.3200 -97.3300 251.000 30.0 128.878 4.410 -999.990 -999.990 1.289 ..P WKT 2010 09 14 02 59 55 31.3200 -97.3300 251.000 122.0 131.445 4.120 -999.990 -999.990 1.314 ..P WKT 2010 09 14 03 04 55 31.3200 -97.3300 251.000 457.0 138.406 4.630 -999.990 -999.990 1.384 ..P WKT 2010 09 14 03 14 55 31.3200 -97.3300 251.000 30.0 132.437 4.110 -999.990 -999.990 1.324 ..P WKT 2010 09 14 03 19 55 31.3200 -97.3300 251.000 122.0 130.767 4.340 -999.990 -999.990 1.308 ..P WKT 2010 09 14 03 24 55 31.3200 -97.3300 251.000 457.0 134.863 4.850 -999.990 -999.990 1.349 ..P WKT 2010 09 14 03 29 55 31.3200 -97.3300 251.000 30.0 130.585 4.410 -999.990 -999.990 1.306 ..P WKT 2010 09 14 03 34 55 31.3200 -97.3300 251.000 122.0 134.818 4.140 -999.990 -999.990 1.348 ..P WKT 2010 09 14 03 39 55 31.3200 -97.3300 251.000 457.0 128.344 4.610 -999.990 -999.990 1.283 ..P WKT 2010 09 14 03 49 55 31.3200 -97.3300 251.000 30.0 131.358 3.730 -999.990 -999.990 1.314 ..P WKT 2010 09 14 03 54 55 31.3200 -97.3300 251.000 122.0 137.688 3.950 -999.990 -999.990 1.377 ..P WKT 2010 09 14 03 59 55 31.3200 -97.3300 251.000 457.0 140.450 3.960 -999.990 -999.990 1.404 ..P WKT 2010 09 14 04 04 55 31.3200 -97.3300 251.000 30.0 134.154 3.990 -999.990 -999.990 1.342 ..P WKT 2010 09 14 04 09 55 31.3200 -97.3300 251.000 122.0 127.995 4.320 -999.990 -999.990 1.280 ..P WKT 2010 09 14 04 14 55 31.3200 -97.3300 251.000 457.0 142.969 4.440 -999.990 -999.990 1.430 ..P WKT 2010 09 14 04 24 55 31.3200 -97.3300 251.000 30.0 142.315 4.470 -999.990 -999.990 1.423 ..P WKT 2010 09 14 04 29 55 31.3200 -97.3300 251.000 122.0 142.332 4.020 -999.990 -999.990 1.423 ..P WKT 2010 09 14 04 34 55 31.3200 -97.3300 251.000 457.0 127.805 4.070 -999.990 -999.990 1.278 ..P WKT 2010 09 14 04 39 55 31.3200 -97.3300 251.000 30.0 138.524 3.690 -999.990 -999.990 1.385 ..P WKT 2010 09 14 04 44 55 31.3200 -97.3300 251.000 122.0 130.583 3.600 -999.990 -999.990 1.306 ..P WKT 2010 09 14 04 49 55 31.3200 -97.3300 251.000 457.0 135.539 4.100 -999.990 -999.990 1.355 ..P WKT 2010 09 14 05 04 55 31.3200 -97.3300 251.000 30.0 144.504 3.480 -999.990 -999.990 1.445 ..P WKT 2010 09 14 05 09 55 31.3200 -97.3300 251.000 122.0 129.090 4.670 -999.990 -999.990 1.291 ..P WKT 2010 09 14 05 14 55 31.3200 -97.3300 251.000 457.0 138.090 5.200 -999.990 -999.990 1.381 ..P WKT 2010 09 14 05 19 55 31.3200 -97.3300 251.000 30.0 135.569 3.670 -999.990 -999.990 1.356 ..P WKT 2010 09 14 05 24 55 31.3200 -97.3300 251.000 122.0 141.552 3.570 -999.990 -999.990 1.416 ..P WKT 2010 09 14 05 29 55 31.3200 -97.3300 251.000 457.0 140.402 3.380 -999.990 -999.990 1.404 ..P WKT 2010 09 14 05 39 55 31.3200 -97.3300 251.000 30.0 138.839 4.390 -999.990 -999.990 1.388 ..P WKT 2010 09 14 05 44 55 31.3200 -97.3300 251.000 122.0 132.666 4.130 -999.990 -999.990 1.327 ..P WKT 2010 09 14 05 49 55 31.3200 -97.3300 251.000 457.0 142.123 3.270 -999.990 -999.990 1.421 ..P WKT 2010 09 14 05 54 55 31.3200 -97.3300 251.000 30.0 135.676 3.160 -999.990 -999.990 1.357 ..P WKT 2010 09 14 05 59 55 31.3200 -97.3300 251.000 122.0 149.245 3.580 -999.990 -999.990 1.492 ..P WKT 2010 09 14 06 04 55 31.3200 -97.3300 251.000 457.0 134.300 3.570 -999.990 -999.990 1.343 ..P WKT 2010 09 14 06 14 55 31.3200 -97.3300 251.000 30.0 135.723 2.700 -999.990 -999.990 1.357 ..P WKT 2010 09 14 06 19 55 31.3200 -97.3300 251.000 122.0 123.444 4.300 -999.990 -999.990 1.234 ..P WKT 2010 09 14 06 24 55 31.3200 -97.3300 251.000 457.0 135.972 3.560 -999.990 -999.990 1.360 ..P WKT 2010 09 14 06 29 55 31.3200 -97.3300 251.000 30.0 136.028 3.110 -999.990 -999.990 1.360 ..P WKT 2010 09 14 06 34 55 31.3200 -97.3300 251.000 122.0 125.669 3.390 -999.990 -999.990 1.257 ..P WKT 2010 09 14 06 39 55 31.3200 -97.3300 251.000 457.0 143.676 3.540 -999.990 -999.990 1.437 ..P WKT 2010 09 14 06 49 55 31.3200 -97.3300 251.000 30.0 132.943 3.160 -999.990 -999.990 1.329 ..P WKT 2010 09 14 06 54 55 31.3200 -97.3300 251.000 122.0 128.321 3.070 -999.990 -999.990 1.283 ..P WKT 2010 09 14 06 59 55 31.3200 -97.3300 251.000 457.0 134.112 3.310 -999.990 -999.990 1.341 ..P WKT 2010 09 14 07 04 55 31.3200 -97.3300 251.000 30.0 134.970 3.390 -999.990 -999.990 1.350 ..P WKT 2010 09 14 07 09 55 31.3200 -97.3300 251.000 122.0 126.650 3.330 -999.990 -999.990 1.267 ..P WKT 2010 09 14 07 14 55 31.3200 -97.3300 251.000 457.0 138.468 3.520 -999.990 -999.990 1.385 ..P WKT 2010 09 14 07 24 55 31.3200 -97.3300 251.000 30.0 142.825 4.050 -999.990 -999.990 1.428 ..P WKT 2010 09 14 07 29 55 31.3200 -97.3300 251.000 122.0 131.121 3.750 -999.990 -999.990 1.311 ..P WKT 2010 09 14 07 34 55 31.3200 -97.3300 251.000 457.0 141.469 3.460 -999.990 -999.990 1.415 ..P WKT 2010 09 14 07 39 55 31.3200 -97.3300 251.000 30.0 138.394 4.450 -999.990 -999.990 1.384 ..P WKT 2010 09 14 07 44 55 31.3200 -97.3300 251.000 122.0 134.086 3.340 -999.990 -999.990 1.341 ..P WKT 2010 09 14 07 49 55 31.3200 -97.3300 251.000 457.0 154.567 3.800 -999.990 -999.990 1.546 ..P WKT 2010 09 14 07 59 55 31.3200 -97.3300 251.000 30.0 127.447 3.710 -999.990 -999.990 1.274 ..P WKT 2010 09 14 08 04 55 31.3200 -97.3300 251.000 122.0 108.059 3.060 -999.990 -999.990 1.081 ..P WKT 2010 09 14 08 09 55 31.3200 -97.3300 251.000 457.0 155.764 3.530 -999.990 -999.990 1.558 ..P WKT 2010 09 14 08 14 55 31.3200 -97.3300 251.000 30.0 132.954 3.190 -999.990 -999.990 1.330 ..P WKT 2010 09 14 08 19 55 31.3200 -97.3300 251.000 122.0 102.755 3.130 -999.990 -999.990 1.028 ..P WKT 2010 09 14 08 24 55 31.3200 -97.3300 251.000 457.0 161.815 3.330 -999.990 -999.990 1.618 ..P WKT 2010 09 14 08 34 55 31.3200 -97.3300 251.000 30.0 121.035 3.060 -999.990 -999.990 1.210 ..P WKT 2010 09 14 08 39 55 31.3200 -97.3300 251.000 122.0 114.286 2.710 -999.990 -999.990 1.143 ..P WKT 2010 09 14 08 44 55 31.3200 -97.3300 251.000 457.0 163.108 3.590 -999.990 -999.990 1.631 ..P WKT 2010 09 14 08 49 55 31.3200 -97.3300 251.000 30.0 119.131 3.560 -999.990 -999.990 1.191 ..P WKT 2010 09 14 08 54 55 31.3200 -97.3300 251.000 122.0 114.026 4.140 -999.990 -999.990 1.140 ..P WKT 2010 09 14 08 59 55 31.3200 -97.3300 251.000 457.0 164.210 4.840 -999.990 -999.990 1.642 ..P WKT 2010 09 14 09 09 55 31.3200 -97.3300 251.000 30.0 113.884 4.950 -999.990 -999.990 1.139 ..P WKT 2010 09 14 09 14 55 31.3200 -97.3300 251.000 122.0 113.003 5.070 -999.990 -999.990 1.130 ..P WKT 2010 09 14 09 19 55 31.3200 -97.3300 251.000 457.0 164.936 4.630 -999.990 -999.990 1.649 ..P WKT 2010 09 14 09 24 55 31.3200 -97.3300 251.000 30.0 123.280 4.050 -999.990 -999.990 1.233 ..P WKT 2010 09 14 09 29 55 31.3200 -97.3300 251.000 122.0 113.917 3.470 -999.990 -999.990 1.139 ..P WKT 2010 09 14 09 34 55 31.3200 -97.3300 251.000 457.0 154.897 3.360 -999.990 -999.990 1.549 ..P WKT 2010 09 14 09 44 55 31.3200 -97.3300 251.000 30.0 119.461 4.120 -999.990 -999.990 1.195 ..P WKT 2010 09 14 09 49 55 31.3200 -97.3300 251.000 122.0 110.080 2.500 -999.990 -999.990 1.101 ..P WKT 2010 09 14 09 54 55 31.3200 -97.3300 251.000 457.0 114.923 4.480 -999.990 -999.990 1.149 ..P WKT 2010 09 14 09 59 55 31.3200 -97.3300 251.000 30.0 110.467 2.260 -999.990 -999.990 1.105 ..P WKT 2010 09 14 10 04 55 31.3200 -97.3300 251.000 122.0 118.867 2.970 -999.990 -999.990 1.189 ..P WKT 2010 09 14 10 09 55 31.3200 -97.3300 251.000 457.0 119.060 3.010 -999.990 -999.990 1.191 ..P WKT 2010 09 14 10 19 55 31.3200 -97.3300 251.000 30.0 125.483 2.760 -999.990 -999.990 1.255 ..P WKT 2010 09 14 10 24 55 31.3200 -97.3300 251.000 122.0 121.320 2.720 -999.990 -999.990 1.213 ..P WKT 2010 09 14 10 29 55 31.3200 -97.3300 251.000 457.0 109.910 2.200 -999.990 -999.990 1.099 ..P WKT 2010 09 14 10 34 55 31.3200 -97.3300 251.000 30.0 128.991 2.670 -999.990 -999.990 1.290 ..P WKT 2010 09 14 10 39 55 31.3200 -97.3300 251.000 122.0 122.504 2.520 -999.990 -999.990 1.225 ..P WKT 2010 09 14 10 44 55 31.3200 -97.3300 251.000 457.0 128.048 3.580 -999.990 -999.990 1.280 ..P WKT 2010 09 14 10 54 55 31.3200 -97.3300 251.000 30.0 125.700 2.800 -999.990 -999.990 1.257 ..P WKT 2010 09 14 10 59 55 31.3200 -97.3300 251.000 122.0 128.470 2.900 -999.990 -999.990 1.285 ..P WKT 2010 09 14 11 04 55 31.3200 -97.3300 251.000 457.0 113.199 2.640 -999.990 -999.990 1.132 ..P WKT 2010 09 14 11 09 55 31.3200 -97.3300 251.000 30.0 123.350 2.900 -999.990 -999.990 1.234 ..P WKT 2010 09 14 11 14 55 31.3200 -97.3300 251.000 122.0 126.940 3.290 -999.990 -999.990 1.269 ..P WKT 2010 09 14 11 19 55 31.3200 -97.3300 251.000 457.0 130.939 2.720 -999.990 -999.990 1.309 ..P WKT 2010 09 14 11 29 55 31.3200 -97.3300 251.000 30.0 128.704 2.860 -999.990 -999.990 1.287 ..P WKT 2010 09 14 11 34 55 31.3200 -97.3300 251.000 122.0 125.476 3.210 -999.990 -999.990 1.255 ..P WKT 2010 09 14 11 39 55 31.3200 -97.3300 251.000 457.0 116.100 6.280 -999.990 -999.990 1.161 ..P WKT 2010 09 14 11 44 55 31.3200 -97.3300 251.000 30.0 119.157 2.340 -999.990 -999.990 1.192 ..P WKT 2010 09 14 11 49 55 31.3200 -97.3300 251.000 122.0 117.706 3.220 -999.990 -999.990 1.177 ..P WKT 2010 09 14 12 09 55 31.3200 -97.3300 251.000 457.0 105.216 2.680 -999.990 -999.990 1.052 ..P WKT 2010 09 14 12 10 25 31.3200 -97.3300 251.000 457.0 107.592 2.480 -999.990 -999.990 1.076 ..P WKT 2010 09 14 12 10 55 31.3200 -97.3300 251.000 457.0 103.410 3.250 -999.990 -999.990 1.034 ..P WKT 2010 09 14 12 11 25 31.3200 -97.3300 251.000 457.0 104.693 2.750 -999.990 -999.990 1.047 ..P WKT 2010 09 14 12 11 55 31.3200 -97.3300 251.000 457.0 107.616 2.600 -999.990 -999.990 1.076 ..P WKT 2010 09 14 12 12 25 31.3200 -97.3300 251.000 457.0 105.347 3.340 -999.990 -999.990 1.053 ..P WKT 2010 09 14 12 12 55 31.3200 -97.3300 251.000 457.0 105.810 2.590 -999.990 -999.990 1.058 ..P WKT 2010 09 14 12 13 25 31.3200 -97.3300 251.000 457.0 106.546 3.210 -999.990 -999.990 1.065 ..P WKT 2010 09 14 12 13 55 31.3200 -97.3300 251.000 457.0 107.010 4.320 -999.990 -999.990 1.070 ..P WKT 2010 09 14 12 14 25 31.3200 -97.3300 251.000 457.0 102.007 2.170 -999.990 -999.990 1.020 ..P WKT 2010 09 14 12 14 55 31.3200 -97.3300 251.000 457.0 109.850 4.450 -999.990 -999.990 1.099 ..P WKT 2010 09 14 12 19 55 31.3200 -97.3300 251.000 30.0 113.939 2.460 -999.990 -999.990 1.139 ..P WKT 2010 09 14 12 24 55 31.3200 -97.3300 251.000 122.0 115.840 5.190 -999.990 -999.990 1.158 ..P WKT 2010 09 14 12 29 55 31.3200 -97.3300 251.000 457.0 108.721 4.720 -999.990 -999.990 1.087 ..P WKT 2010 09 14 12 34 55 31.3200 -97.3300 251.000 30.0 113.630 4.730 -999.990 -999.990 1.136 ..P WKT 2010 09 14 12 39 55 31.3200 -97.3300 251.000 122.0 113.072 5.690 -999.990 -999.990 1.131 ..P WKT 2010 09 14 12 44 55 31.3200 -97.3300 251.000 457.0 104.857 2.470 -999.990 -999.990 1.049 ..P WKT 2010 09 14 12 54 55 31.3200 -97.3300 251.000 30.0 115.773 3.000 -999.990 -999.990 1.158 ..P WKT 2010 09 14 12 59 55 31.3200 -97.3300 251.000 122.0 112.205 4.280 -999.990 -999.990 1.122 ..P WKT 2010 09 14 13 04 55 31.3200 -97.3300 251.000 457.0 114.109 4.770 -999.990 -999.990 1.141 ..P WKT 2010 09 14 13 09 55 31.3200 -97.3300 251.000 30.0 116.560 4.110 -999.990 -999.990 1.166 ..P WKT 2010 09 14 13 14 55 31.3200 -97.3300 251.000 122.0 114.633 3.640 -999.990 -999.990 1.146 ..P WKT 2010 09 14 13 19 55 31.3200 -97.3300 251.000 457.0 116.538 3.140 -999.990 -999.990 1.165 ..P WKT 2010 09 14 13 29 55 31.3200 -97.3300 251.000 30.0 113.896 2.680 -999.990 -999.990 1.139 ..P WKT 2010 09 14 13 34 55 31.3200 -97.3300 251.000 122.0 118.382 3.800 -999.990 -999.990 1.184 ..P WKT 2010 09 14 13 39 55 31.3200 -97.3300 251.000 457.0 116.845 3.850 -999.990 -999.990 1.168 ..P WKT 2010 09 14 13 44 55 31.3200 -97.3300 251.000 30.0 120.785 3.990 -999.990 -999.990 1.208 ..P WKT 2010 09 14 13 49 55 31.3200 -97.3300 251.000 122.0 121.166 3.200 -999.990 -999.990 1.212 ..P WKT 2010 09 14 13 54 55 31.3200 -97.3300 251.000 457.0 124.285 3.440 -999.990 -999.990 1.243 ..P WKT 2010 09 14 14 04 55 31.3200 -97.3300 251.000 30.0 110.803 2.940 -999.990 -999.990 1.108 ..P WKT 2010 09 14 14 09 55 31.3200 -97.3300 251.000 122.0 118.305 3.050 -999.990 -999.990 1.183 ..P WKT 2010 09 14 14 14 55 31.3200 -97.3300 251.000 457.0 115.808 3.650 -999.990 -999.990 1.158 ..P WKT 2010 09 14 14 19 55 31.3200 -97.3300 251.000 30.0 115.093 3.140 -999.990 -999.990 1.151 ..P WKT 2010 09 14 14 24 55 31.3200 -97.3300 251.000 122.0 122.050 3.730 -999.990 -999.990 1.220 ..P WKT 2010 09 14 14 29 55 31.3200 -97.3300 251.000 457.0 125.035 3.440 -999.990 -999.990 1.250 ..P WKT 2010 09 14 14 39 55 31.3200 -97.3300 251.000 30.0 126.189 4.350 -999.990 -999.990 1.262 ..P WKT 2010 09 14 14 44 55 31.3200 -97.3300 251.000 122.0 130.526 3.200 -999.990 -999.990 1.305 ..P WKT 2010 09 14 14 49 55 31.3200 -97.3300 251.000 457.0 120.058 3.470 -999.990 -999.990 1.201 ..P WKT 2010 09 14 14 54 55 31.3200 -97.3300 251.000 30.0 121.379 4.090 -999.990 -999.990 1.214 ..P WKT 2010 09 14 14 59 55 31.3200 -97.3300 251.000 122.0 125.717 3.130 -999.990 -999.990 1.257 ..P WKT 2010 09 14 15 04 55 31.3200 -97.3300 251.000 457.0 115.383 3.250 -999.990 -999.990 1.154 ..P WKT 2010 09 14 15 14 55 31.3200 -97.3300 251.000 30.0 121.944 3.230 -999.990 -999.990 1.219 ..P WKT 2010 09 14 15 19 55 31.3200 -97.3300 251.000 122.0 126.911 3.250 -999.990 -999.990 1.269 ..P WKT 2010 09 14 15 24 55 31.3200 -97.3300 251.000 457.0 127.762 3.350 -999.990 -999.990 1.278 ..P WKT 2010 09 14 15 29 55 31.3200 -97.3300 251.000 30.0 130.536 2.760 -999.990 -999.990 1.305 ..P WKT 2010 09 14 15 34 55 31.3200 -97.3300 251.000 122.0 138.798 2.570 -999.990 -999.990 1.388 ..P WKT 2010 09 14 15 39 55 31.3200 -97.3300 251.000 457.0 133.339 3.220 -999.990 -999.990 1.333 ..P WKT 2010 09 14 15 49 55 31.3200 -97.3300 251.000 30.0 135.105 2.680 -999.990 -999.990 1.351 ..P WKT 2010 09 14 15 54 55 31.3200 -97.3300 251.000 122.0 142.057 3.760 -999.990 -999.990 1.421 ..P WKT 2010 09 14 15 59 55 31.3200 -97.3300 251.000 457.0 139.401 4.430 -999.990 -999.990 1.394 ..P WKT 2010 09 14 16 04 55 31.3200 -97.3300 251.000 30.0 135.509 3.270 -999.990 -999.990 1.355 ..P WKT 2010 09 14 16 09 55 31.3200 -97.3300 251.000 122.0 141.502 2.590 -999.990 -999.990 1.415 ..P WKT 2010 09 14 16 14 55 31.3200 -97.3300 251.000 457.0 139.669 2.830 -999.990 -999.990 1.397 ..P WKT 2010 09 14 16 24 55 31.3200 -97.3300 251.000 30.0 139.003 3.100 -999.990 -999.990 1.390 ..P WKT 2010 09 14 16 29 55 31.3200 -97.3300 251.000 122.0 154.458 3.800 -999.990 -999.990 1.545 ..P WKT 2010 09 14 16 34 55 31.3200 -97.3300 251.000 457.0 151.507 3.370 -999.990 -999.990 1.515 ..P WKT 2010 09 14 16 39 55 31.3200 -97.3300 251.000 30.0 144.158 3.720 -999.990 -999.990 1.442 ..P WKT 2010 09 14 16 44 55 31.3200 -97.3300 251.000 122.0 152.198 3.850 -999.990 -999.990 1.522 ..P WKT 2010 09 14 16 49 55 31.3200 -97.3300 251.000 457.0 155.842 4.620 -999.990 -999.990 1.558 ..P WKT 2010 09 14 17 04 55 31.3200 -97.3300 251.000 30.0 136.243 3.830 -999.990 -999.990 1.362 ..P WKT 2010 09 14 17 09 55 31.3200 -97.3300 251.000 122.0 139.464 3.710 -999.990 -999.990 1.395 ..P WKT 2010 09 14 17 14 55 31.3200 -97.3300 251.000 457.0 136.912 3.740 -999.990 -999.990 1.369 ..P WKT 2010 09 14 17 19 55 31.3200 -97.3300 251.000 30.0 133.809 3.620 -999.990 -999.990 1.338 ..P WKT 2010 09 14 17 24 55 31.3200 -97.3300 251.000 122.0 145.557 3.920 -999.990 -999.990 1.456 ..P WKT 2010 09 14 17 29 55 31.3200 -97.3300 251.000 457.0 142.454 3.830 -999.990 -999.990 1.425 ..P WKT 2010 09 14 17 39 55 31.3200 -97.3300 251.000 30.0 142.349 3.660 -999.990 -999.990 1.423 ..P WKT 2010 09 14 17 44 55 31.3200 -97.3300 251.000 122.0 150.024 3.360 -999.990 -999.990 1.500 ..P WKT 2010 09 14 17 49 55 31.3200 -97.3300 251.000 457.0 143.668 3.790 -999.990 -999.990 1.437 ..P WKT 2010 09 14 17 54 55 31.3200 -97.3300 251.000 30.0 137.861 4.170 -999.990 -999.990 1.379 ..P WKT 2010 09 14 17 59 55 31.3200 -97.3300 251.000 122.0 142.236 3.720 -999.990 -999.990 1.422 ..P WKT 2010 09 14 18 04 55 31.3200 -97.3300 251.000 457.0 144.409 4.360 -999.990 -999.990 1.444 ..P WKT 2010 09 14 18 14 55 31.3200 -97.3300 251.000 30.0 139.477 4.420 -999.990 -999.990 1.395 ..P WKT 2010 09 14 18 19 55 31.3200 -97.3300 251.000 122.0 146.410 3.980 -999.990 -999.990 1.464 ..P WKT 2010 09 14 18 24 55 31.3200 -97.3300 251.000 457.0 136.273 4.120 -999.990 -999.990 1.363 ..P WKT 2010 09 14 18 29 55 31.3200 -97.3300 251.000 30.0 134.395 4.330 -999.990 -999.990 1.344 ..P WKT 2010 09 14 18 34 55 31.3200 -97.3300 251.000 122.0 146.838 5.010 -999.990 -999.990 1.468 ..P WKT 2010 09 14 18 39 55 31.3200 -97.3300 251.000 457.0 138.212 5.090 -999.990 -999.990 1.382 ..P WKT 2010 09 14 18 49 55 31.3200 -97.3300 251.000 30.0 135.007 5.930 -999.990 -999.990 1.350 ..P WKT 2010 09 14 18 54 55 31.3200 -97.3300 251.000 122.0 144.700 5.000 -999.990 -999.990 1.447 ..P WKT 2010 09 14 18 59 55 31.3200 -97.3300 251.000 457.0 133.178 4.860 -999.990 -999.990 1.332 ..P WKT 2010 09 14 19 04 55 31.3200 -97.3300 251.000 30.0 140.943 4.730 -999.990 -999.990 1.409 ..P WKT 2010 09 14 19 09 55 31.3200 -97.3300 251.000 122.0 145.679 5.680 -999.990 -999.990 1.457 ..P WKT 2010 09 14 19 14 55 31.3200 -97.3300 251.000 457.0 139.390 4.520 -999.990 -999.990 1.394 ..P WKT 2010 09 14 19 24 55 31.3200 -97.3300 251.000 30.0 137.798 4.330 -999.990 -999.990 1.378 ..P WKT 2010 09 14 19 29 55 31.3200 -97.3300 251.000 122.0 145.528 3.990 -999.990 -999.990 1.455 ..P WKT 2010 09 14 19 34 55 31.3200 -97.3300 251.000 457.0 143.609 4.100 -999.990 -999.990 1.436 ..P WKT 2010 09 14 19 39 55 31.3200 -97.3300 251.000 30.0 139.760 4.480 -999.990 -999.990 1.398 ..P WKT 2010 09 14 19 44 55 31.3200 -97.3300 251.000 122.0 142.115 5.590 -999.990 -999.990 1.421 ..P WKT 2010 09 14 19 49 55 31.3200 -97.3300 251.000 457.0 136.886 4.050 -999.990 -999.990 1.369 ..P WKT 2010 09 14 19 59 55 31.3200 -97.3300 251.000 30.0 139.035 3.880 -999.990 -999.990 1.390 ..P WKT 2010 09 14 20 04 55 31.3200 -97.3300 251.000 122.0 139.795 3.720 -999.990 -999.990 1.398 ..P WKT 2010 09 14 20 09 55 31.3200 -97.3300 251.000 457.0 139.313 4.800 -999.990 -999.990 1.393 ..P WKT 2010 09 14 20 14 55 31.3200 -97.3300 251.000 30.0 133.036 4.090 -999.990 -999.990 1.330 ..P WKT 2010 09 14 20 19 55 31.3200 -97.3300 251.000 122.0 140.556 4.440 -999.990 -999.990 1.406 ..P WKT 2010 09 14 20 24 55 31.3200 -97.3300 251.000 457.0 134.555 5.020 -999.990 -999.990 1.346 ..P WKT 2010 09 14 20 34 55 31.3200 -97.3300 251.000 30.0 128.936 4.870 -999.990 -999.990 1.289 ..P WKT 2010 09 14 20 39 55 31.3200 -97.3300 251.000 122.0 134.842 4.400 -999.990 -999.990 1.348 ..P WKT 2010 09 14 20 44 55 31.3200 -97.3300 251.000 457.0 128.324 4.130 -999.990 -999.990 1.283 ..P WKT 2010 09 14 20 49 55 31.3200 -97.3300 251.000 30.0 130.089 4.330 -999.990 -999.990 1.301 ..P WKT 2010 09 14 20 54 55 31.3200 -97.3300 251.000 122.0 138.207 5.160 -999.990 -999.990 1.382 ..P WKT 2010 09 14 20 59 55 31.3200 -97.3300 251.000 457.0 131.964 4.050 -999.990 -999.990 1.320 ..P WKT 2010 09 14 21 09 55 31.3200 -97.3300 251.000 30.0 124.920 4.640 -999.990 -999.990 1.249 ..P WKT 2010 09 14 21 14 55 31.3200 -97.3300 251.000 122.0 135.171 4.060 -999.990 -999.990 1.352 ..P WKT 2010 09 14 21 19 55 31.3200 -97.3300 251.000 457.0 128.571 4.040 -999.990 -999.990 1.286 ..P WKT 2010 09 14 21 24 55 31.3200 -97.3300 251.000 30.0 129.429 4.130 -999.990 -999.990 1.294 ..P WKT 2010 09 14 21 29 55 31.3200 -97.3300 251.000 122.0 142.171 4.040 -999.990 -999.990 1.422 ..P WKT 2010 09 14 21 34 55 31.3200 -97.3300 251.000 457.0 127.277 4.130 -999.990 -999.990 1.273 ..P WKT 2010 09 14 21 44 55 31.3200 -97.3300 251.000 30.0 119.813 4.110 -999.990 -999.990 1.198 ..P WKT 2010 09 14 21 49 55 31.3200 -97.3300 251.000 122.0 130.841 3.850 -999.990 -999.990 1.308 ..P WKT 2010 09 14 21 54 55 31.3200 -97.3300 251.000 457.0 125.835 4.130 -999.990 -999.990 1.258 ..P WKT 2010 09 14 21 59 55 31.3200 -97.3300 251.000 30.0 123.040 5.260 -999.990 -999.990 1.230 ..P WKT 2010 09 14 22 04 55 31.3200 -97.3300 251.000 122.0 133.380 4.340 -999.990 -999.990 1.334 ..P WKT 2010 09 14 22 09 55 31.3200 -97.3300 251.000 457.0 123.118 4.240 -999.990 -999.990 1.231 ..P WKT 2010 09 14 22 19 55 31.3200 -97.3300 251.000 30.0 112.407 4.310 -999.990 -999.990 1.124 ..P WKT 2010 09 14 22 24 55 31.3200 -97.3300 251.000 122.0 123.027 4.600 -999.990 -999.990 1.230 ..P WKT 2010 09 14 22 29 55 31.3200 -97.3300 251.000 457.0 118.293 4.600 -999.990 -999.990 1.183 ..P WKT 2010 09 14 22 34 55 31.3200 -97.3300 251.000 30.0 114.942 4.730 -999.990 -999.990 1.149 ..P WKT 2010 09 14 22 39 55 31.3200 -97.3300 251.000 122.0 124.874 5.020 -999.990 -999.990 1.249 ..P WKT 2010 09 14 22 44 55 31.3200 -97.3300 251.000 457.0 119.031 5.190 -999.990 -999.990 1.190 ..P WKT 2010 09 14 22 54 55 31.3200 -97.3300 251.000 30.0 130.103 5.190 -999.990 -999.990 1.301 ..P WKT 2010 09 14 22 59 55 31.3200 -97.3300 251.000 122.0 125.149 5.090 -999.990 -999.990 1.251 ..P WKT 2010 09 14 23 04 55 31.3200 -97.3300 251.000 457.0 121.025 5.560 -999.990 -999.990 1.210 ..P WKT 2010 09 14 23 09 55 31.3200 -97.3300 251.000 30.0 120.224 5.270 -999.990 -999.990 1.202 ..P WKT 2010 09 14 23 14 55 31.3200 -97.3300 251.000 122.0 126.344 5.250 -999.990 -999.990 1.263 ..P WKT 2010 09 14 23 19 55 31.3200 -97.3300 251.000 457.0 124.297 5.860 -999.990 -999.990 1.243 ..P WKT 2010 09 14 23 29 55 31.3200 -97.3300 251.000 30.0 117.979 5.690 -999.990 -999.990 1.180 ..P WKT 2010 09 14 23 34 55 31.3200 -97.3300 251.000 122.0 120.496 6.430 -999.990 -999.990 1.205 ..P WKT 2010 09 14 23 39 55 31.3200 -97.3300 251.000 457.0 123.568 5.780 -999.990 -999.990 1.236 ..P WKT 2010 09 14 23 44 55 31.3200 -97.3300 251.000 30.0 119.298 5.220 -999.990 -999.990 1.193 ..P WKT 2010 09 14 23 49 55 31.3200 -97.3300 251.000 122.0 123.340 7.140 -999.990 -999.990 1.233 ..P WKT 2010 09 15 00 09 55 31.3200 -97.3300 251.000 457.0 122.435 4.790 -999.990 -999.990 1.224 ..P WKT 2010 09 15 00 10 25 31.3200 -97.3300 251.000 457.0 124.079 5.080 -999.990 -999.990 1.241 ..P WKT 2010 09 15 00 10 55 31.3200 -97.3300 251.000 457.0 119.627 6.850 -999.990 -999.990 1.196 ..P WKT 2010 09 15 00 11 25 31.3200 -97.3300 251.000 457.0 116.284 4.780 -999.990 -999.990 1.163 ..P WKT 2010 09 15 00 11 55 31.3200 -97.3300 251.000 457.0 124.024 6.180 -999.990 -999.990 1.240 ..P WKT 2010 09 15 00 12 25 31.3200 -97.3300 251.000 457.0 120.403 5.710 -999.990 -999.990 1.204 ..P WKT 2010 09 15 00 12 55 31.3200 -97.3300 251.000 457.0 118.446 5.140 -999.990 -999.990 1.184 ..P WKT 2010 09 15 00 13 25 31.3200 -97.3300 251.000 457.0 125.907 4.790 -999.990 -999.990 1.259 ..P WKT 2010 09 15 00 13 55 31.3200 -97.3300 251.000 457.0 129.490 5.050 -999.990 -999.990 1.295 ..P WKT 2010 09 15 00 14 25 31.3200 -97.3300 251.000 457.0 125.039 4.640 -999.990 -999.990 1.250 ..P WKT 2010 09 15 00 14 55 31.3200 -97.3300 251.000 457.0 126.128 4.900 -999.990 -999.990 1.261 ..P WKT 2010 09 15 00 19 55 31.3200 -97.3300 251.000 30.0 126.774 4.990 -999.990 -999.990 1.268 ..P WKT 2010 09 15 00 24 55 31.3200 -97.3300 251.000 122.0 127.143 4.640 -999.990 -999.990 1.271 ..P WKT 2010 09 15 00 29 55 31.3200 -97.3300 251.000 457.0 125.020 4.850 -999.990 -999.990 1.250 ..P WKT 2010 09 15 00 34 55 31.3200 -97.3300 251.000 30.0 124.005 4.800 -999.990 -999.990 1.240 ..P WKT 2010 09 15 00 39 55 31.3200 -97.3300 251.000 122.0 130.464 4.670 -999.990 -999.990 1.305 ..P WKT 2010 09 15 00 44 55 31.3200 -97.3300 251.000 457.0 116.994 5.240 -999.990 -999.990 1.170 ..P WKT 2010 09 15 00 54 55 31.3200 -97.3300 251.000 30.0 131.435 4.810 -999.990 -999.990 1.314 ..P WKT 2010 09 15 00 59 55 31.3200 -97.3300 251.000 122.0 123.095 4.560 -999.990 -999.990 1.231 ..P WKT 2010 09 15 01 04 55 31.3200 -97.3300 251.000 457.0 125.822 4.630 -999.990 -999.990 1.258 ..P WKT 2010 09 15 01 09 55 31.3200 -97.3300 251.000 30.0 122.463 5.420 -999.990 -999.990 1.225 ..P WKT 2010 09 15 01 14 55 31.3200 -97.3300 251.000 122.0 126.019 6.400 -999.990 -999.990 1.260 ..P WKT 2010 09 15 01 19 55 31.3200 -97.3300 251.000 457.0 124.873 4.980 -999.990 -999.990 1.249 ..P WKT 2010 09 15 01 29 55 31.3200 -97.3300 251.000 30.0 123.669 4.980 -999.990 -999.990 1.237 ..P WKT 2010 09 15 01 34 55 31.3200 -97.3300 251.000 122.0 129.135 4.680 -999.990 -999.990 1.291 ..P WKT 2010 09 15 01 39 55 31.3200 -97.3300 251.000 457.0 127.970 4.590 -999.990 -999.990 1.280 ..P WKT 2010 09 15 01 44 55 31.3200 -97.3300 251.000 30.0 134.540 4.680 -999.990 -999.990 1.345 ..P WKT 2010 09 15 01 49 55 31.3200 -97.3300 251.000 122.0 142.213 4.740 -999.990 -999.990 1.422 ..P WKT 2010 09 15 01 54 55 31.3200 -97.3300 251.000 457.0 131.105 5.360 -999.990 -999.990 1.311 ..P WKT 2010 09 15 02 04 55 31.3200 -97.3300 251.000 30.0 127.889 6.180 -999.990 -999.990 1.279 ..P WKT 2010 09 15 02 09 55 31.3200 -97.3300 251.000 122.0 138.673 4.860 -999.990 -999.990 1.387 ..P WKT 2010 09 15 02 14 55 31.3200 -97.3300 251.000 457.0 127.375 4.780 -999.990 -999.990 1.274 ..P WKT 2010 09 15 02 19 55 31.3200 -97.3300 251.000 30.0 136.224 5.990 -999.990 -999.990 1.362 ..P WKT 2010 09 15 02 24 55 31.3200 -97.3300 251.000 122.0 138.725 4.290 -999.990 -999.990 1.387 ..P WKT 2010 09 15 02 29 55 31.3200 -97.3300 251.000 457.0 127.708 4.730 -999.990 -999.990 1.277 ..P WKT 2010 09 15 02 39 55 31.3200 -97.3300 251.000 30.0 133.183 4.320 -999.990 -999.990 1.332 ..P WKT 2010 09 15 02 44 55 31.3200 -97.3300 251.000 122.0 132.019 4.620 -999.990 -999.990 1.320 ..P WKT 2010 09 15 02 49 55 31.3200 -97.3300 251.000 457.0 138.713 4.790 -999.990 -999.990 1.387 ..P WKT 2010 09 15 02 54 55 31.3200 -97.3300 251.000 30.0 139.340 5.300 -999.990 -999.990 1.393 ..P WKT 2010 09 15 02 59 55 31.3200 -97.3300 251.000 122.0 132.390 5.760 -999.990 -999.990 1.324 ..P WKT 2010 09 15 03 04 55 31.3200 -97.3300 251.000 457.0 126.542 5.010 -999.990 -999.990 1.265 ..P WKT 2010 09 15 03 14 55 31.3200 -97.3300 251.000 30.0 133.881 5.030 -999.990 -999.990 1.339 ..P WKT 2010 09 15 03 19 55 31.3200 -97.3300 251.000 122.0 134.804 5.490 -999.990 -999.990 1.348 ..P WKT 2010 09 15 03 24 55 31.3200 -97.3300 251.000 457.0 125.676 5.870 -999.990 -999.990 1.257 ..P WKT 2010 09 15 03 29 55 31.3200 -97.3300 251.000 30.0 138.989 4.730 -999.990 -999.990 1.390 ..P WKT 2010 09 15 03 34 55 31.3200 -97.3300 251.000 122.0 133.579 4.900 -999.990 -999.990 1.336 ..P WKT 2010 09 15 03 39 55 31.3200 -97.3300 251.000 457.0 136.979 4.950 -999.990 -999.990 1.370 ..P WKT 2010 09 15 03 49 55 31.3200 -97.3300 251.000 30.0 127.856 4.390 -999.990 -999.990 1.279 ..P WKT 2010 09 15 03 54 55 31.3200 -97.3300 251.000 122.0 133.357 4.500 -999.990 -999.990 1.334 ..P WKT 2010 09 15 03 59 55 31.3200 -97.3300 251.000 457.0 125.929 5.350 -999.990 -999.990 1.259 ..P WKT 2010 09 15 04 04 55 31.3200 -97.3300 251.000 30.0 131.154 4.600 -999.990 -999.990 1.312 ..P WKT 2010 09 15 04 09 55 31.3200 -97.3300 251.000 122.0 135.553 4.770 -999.990 -999.990 1.356 ..P WKT 2010 09 15 04 14 55 31.3200 -97.3300 251.000 457.0 135.001 5.090 -999.990 -999.990 1.350 ..P WKT 2010 09 15 04 24 55 31.3200 -97.3300 251.000 30.0 134.487 4.710 -999.990 -999.990 1.345 ..P WKT 2010 09 15 04 29 55 31.3200 -97.3300 251.000 122.0 134.250 4.800 -999.990 -999.990 1.343 ..P WKT 2010 09 15 04 34 55 31.3200 -97.3300 251.000 457.0 136.486 4.310 -999.990 -999.990 1.365 ..P WKT 2010 09 15 04 39 55 31.3200 -97.3300 251.000 30.0 128.281 3.850 -999.990 -999.990 1.283 ..P WKT 2010 09 15 04 44 55 31.3200 -97.3300 251.000 122.0 129.419 4.620 -999.990 -999.990 1.294 ..P WKT 2010 09 15 04 49 55 31.3200 -97.3300 251.000 457.0 133.851 3.660 -999.990 -999.990 1.339 ..P WKT 2010 09 15 05 04 55 31.3200 -97.3300 251.000 30.0 132.582 4.620 -999.990 -999.990 1.326 ..P WKT 2010 09 15 05 09 55 31.3200 -97.3300 251.000 122.0 137.143 4.440 -999.990 -999.990 1.371 ..P WKT 2010 09 15 05 14 55 31.3200 -97.3300 251.000 457.0 130.727 4.890 -999.990 -999.990 1.307 ..P WKT 2010 09 15 05 19 55 31.3200 -97.3300 251.000 30.0 144.068 5.530 -999.990 -999.990 1.441 ..P WKT 2010 09 15 05 24 55 31.3200 -97.3300 251.000 122.0 143.413 4.750 -999.990 -999.990 1.434 ..P WKT 2010 09 15 05 29 55 31.3200 -97.3300 251.000 457.0 137.272 4.270 -999.990 -999.990 1.373 ..P WKT 2010 09 15 05 39 55 31.3200 -97.3300 251.000 30.0 158.691 4.380 -999.990 -999.990 1.587 ..P WKT 2010 09 15 05 44 55 31.3200 -97.3300 251.000 122.0 141.550 4.530 -999.990 -999.990 1.416 ..P WKT 2010 09 15 05 49 55 31.3200 -97.3300 251.000 457.0 137.710 5.570 -999.990 -999.990 1.377 ..P WKT 2010 09 15 05 54 55 31.3200 -97.3300 251.000 30.0 141.818 6.180 -999.990 -999.990 1.418 ..P WKT 2010 09 15 05 59 55 31.3200 -97.3300 251.000 122.0 140.994 4.230 -999.990 -999.990 1.410 ..P WKT 2010 09 15 06 04 55 31.3200 -97.3300 251.000 457.0 137.292 4.170 -999.990 -999.990 1.373 ..P WKT 2010 09 15 06 14 55 31.3200 -97.3300 251.000 30.0 144.742 3.680 -999.990 -999.990 1.447 ..P WKT 2010 09 15 06 19 55 31.3200 -97.3300 251.000 122.0 146.167 4.250 -999.990 -999.990 1.462 ..P WKT 2010 09 15 06 24 55 31.3200 -97.3300 251.000 457.0 131.299 3.350 -999.990 -999.990 1.313 ..P WKT 2010 09 15 06 29 55 31.3200 -97.3300 251.000 30.0 144.498 4.530 -999.990 -999.990 1.445 ..P WKT 2010 09 15 06 34 55 31.3200 -97.3300 251.000 122.0 135.109 3.210 -999.990 -999.990 1.351 ..P WKT 2010 09 15 06 39 55 31.3200 -97.3300 251.000 457.0 131.061 4.260 -999.990 -999.990 1.311 ..P WKT 2010 09 15 06 49 55 31.3200 -97.3300 251.000 30.0 132.427 3.340 -999.990 -999.990 1.324 ..P WKT 2010 09 15 06 54 55 31.3200 -97.3300 251.000 122.0 130.452 2.870 -999.990 -999.990 1.305 ..P WKT 2010 09 15 06 59 55 31.3200 -97.3300 251.000 457.0 125.195 3.000 -999.990 -999.990 1.252 ..P WKT 2010 09 15 07 04 55 31.3200 -97.3300 251.000 30.0 132.794 4.880 -999.990 -999.990 1.328 ..P WKT 2010 09 15 07 09 55 31.3200 -97.3300 251.000 122.0 132.324 3.030 -999.990 -999.990 1.323 ..P WKT 2010 09 15 07 14 55 31.3200 -97.3300 251.000 457.0 123.789 3.680 -999.990 -999.990 1.238 ..P WKT 2010 09 15 07 24 55 31.3200 -97.3300 251.000 30.0 129.627 3.170 -999.990 -999.990 1.296 ..P WKT 2010 09 15 07 29 55 31.3200 -97.3300 251.000 122.0 131.421 3.810 -999.990 -999.990 1.314 ..P WKT 2010 09 15 07 34 55 31.3200 -97.3300 251.000 457.0 127.887 3.870 -999.990 -999.990 1.279 ..P WKT 2010 09 15 07 39 55 31.3200 -97.3300 251.000 30.0 128.589 3.300 -999.990 -999.990 1.286 ..P WKT 2010 09 15 07 44 55 31.3200 -97.3300 251.000 122.0 128.608 3.860 -999.990 -999.990 1.286 ..P WKT 2010 09 15 07 49 55 31.3200 -97.3300 251.000 457.0 130.539 3.980 -999.990 -999.990 1.305 ..P WKT 2010 09 15 07 59 55 31.3200 -97.3300 251.000 30.0 122.952 3.450 -999.990 -999.990 1.230 ..P WKT 2010 09 15 08 04 55 31.3200 -97.3300 251.000 122.0 126.539 4.470 -999.990 -999.990 1.265 ..P WKT 2010 09 15 08 09 55 31.3200 -97.3300 251.000 457.0 125.213 3.410 -999.990 -999.990 1.252 ..P WKT 2010 09 15 08 14 55 31.3200 -97.3300 251.000 30.0 125.525 3.420 -999.990 -999.990 1.255 ..P WKT 2010 09 15 08 19 55 31.3200 -97.3300 251.000 122.0 126.655 3.210 -999.990 -999.990 1.267 ..P WKT 2010 09 15 08 24 55 31.3200 -97.3300 251.000 457.0 125.875 3.770 -999.990 -999.990 1.259 ..P WKT 2010 09 15 08 34 55 31.3200 -97.3300 251.000 30.0 130.861 3.110 -999.990 -999.990 1.309 ..P WKT 2010 09 15 08 39 55 31.3200 -97.3300 251.000 122.0 132.263 3.280 -999.990 -999.990 1.323 ..P WKT 2010 09 15 08 44 55 31.3200 -97.3300 251.000 457.0 132.845 3.080 -999.990 -999.990 1.328 ..P WKT 2010 09 15 08 49 55 31.3200 -97.3300 251.000 30.0 129.068 2.920 -999.990 -999.990 1.291 ..P WKT 2010 09 15 08 54 55 31.3200 -97.3300 251.000 122.0 129.650 3.150 -999.990 -999.990 1.296 ..P WKT 2010 09 15 08 59 55 31.3200 -97.3300 251.000 457.0 121.787 3.780 -999.990 -999.990 1.218 ..P WKT 2010 09 15 09 09 55 31.3200 -97.3300 251.000 30.0 126.963 2.910 -999.990 -999.990 1.270 ..P WKT 2010 09 15 09 14 55 31.3200 -97.3300 251.000 122.0 129.647 2.780 -999.990 -999.990 1.296 ..P WKT 2010 09 15 09 19 55 31.3200 -97.3300 251.000 457.0 126.612 3.950 -999.990 -999.990 1.266 ..P WKT 2010 09 15 09 24 55 31.3200 -97.3300 251.000 30.0 127.390 3.050 -999.990 -999.990 1.274 ..P WKT 2010 09 15 09 29 55 31.3200 -97.3300 251.000 122.0 125.989 2.780 -999.990 -999.990 1.260 ..P WKT 2010 09 15 09 34 55 31.3200 -97.3300 251.000 457.0 125.405 4.250 -999.990 -999.990 1.254 ..P WKT 2010 09 15 09 44 55 31.3200 -97.3300 251.000 30.0 119.866 3.070 -999.990 -999.990 1.199 ..P WKT 2010 09 15 09 49 55 31.3200 -97.3300 251.000 122.0 128.786 3.060 -999.990 -999.990 1.288 ..P WKT 2010 09 15 09 54 55 31.3200 -97.3300 251.000 457.0 120.839 3.630 -999.990 -999.990 1.208 ..P WKT 2010 09 15 09 59 55 31.3200 -97.3300 251.000 30.0 125.677 4.570 -999.990 -999.990 1.257 ..P WKT 2010 09 15 10 04 55 31.3200 -97.3300 251.000 122.0 130.105 3.640 -999.990 -999.990 1.301 ..P WKT 2010 09 15 10 09 55 31.3200 -97.3300 251.000 457.0 120.666 3.220 -999.990 -999.990 1.207 ..P WKT 2010 09 15 10 19 55 31.3200 -97.3300 251.000 30.0 126.744 3.700 -999.990 -999.990 1.267 ..P WKT 2010 09 15 10 24 55 31.3200 -97.3300 251.000 122.0 130.567 4.720 -999.990 -999.990 1.306 ..P WKT 2010 09 15 10 29 55 31.3200 -97.3300 251.000 457.0 128.548 4.570 -999.990 -999.990 1.285 ..P WKT 2010 09 15 10 34 55 31.3200 -97.3300 251.000 30.0 128.703 5.570 -999.990 -999.990 1.287 ..P WKT 2010 09 15 10 39 55 31.3200 -97.3300 251.000 122.0 139.722 5.840 -999.990 -999.990 1.397 ..P WKT 2010 09 15 10 44 55 31.3200 -97.3300 251.000 457.0 135.258 3.520 -999.990 -999.990 1.353 ..P WKT 2010 09 15 10 54 55 31.3200 -97.3300 251.000 30.0 138.435 3.490 -999.990 -999.990 1.384 ..P WKT 2010 09 15 10 59 55 31.3200 -97.3300 251.000 122.0 140.643 4.610 -999.990 -999.990 1.406 ..P WKT 2010 09 15 11 04 55 31.3200 -97.3300 251.000 457.0 134.030 5.320 -999.990 -999.990 1.340 ..P WKT 2010 09 15 11 09 55 31.3200 -97.3300 251.000 30.0 130.268 5.840 -999.990 -999.990 1.303 ..P WKT 2010 09 15 11 14 55 31.3200 -97.3300 251.000 122.0 135.596 4.550 -999.990 -999.990 1.356 ..P WKT 2010 09 15 11 19 55 31.3200 -97.3300 251.000 457.0 127.360 3.750 -999.990 -999.990 1.274 ..P WKT 2010 09 15 11 29 55 31.3200 -97.3300 251.000 30.0 132.381 5.360 -999.990 -999.990 1.324 ..P WKT 2010 09 15 11 34 55 31.3200 -97.3300 251.000 122.0 133.024 4.370 -999.990 -999.990 1.330 ..P WKT 2010 09 15 11 39 55 31.3200 -97.3300 251.000 457.0 127.024 5.000 -999.990 -999.990 1.270 ..P WKT 2010 09 15 11 44 55 31.3200 -97.3300 251.000 30.0 130.649 5.310 -999.990 -999.990 1.306 ..P WKT 2010 09 15 11 49 55 31.3200 -97.3300 251.000 122.0 131.156 3.570 -999.990 -999.990 1.312 ..P WKT 2010 09 15 12 09 55 31.3200 -97.3300 251.000 457.0 127.988 4.250 -999.990 -999.990 1.280 ..P WKT 2010 09 15 12 10 25 31.3200 -97.3300 251.000 457.0 128.226 3.950 -999.990 -999.990 1.282 ..P WKT 2010 09 15 12 10 55 31.3200 -97.3300 251.000 457.0 130.361 3.230 -999.990 -999.990 1.304 ..P WKT 2010 09 15 12 11 25 31.3200 -97.3300 251.000 457.0 131.412 4.320 -999.990 -999.990 1.314 ..P WKT 2010 09 15 12 11 55 31.3200 -97.3300 251.000 457.0 126.500 3.030 -999.990 -999.990 1.265 ..P WKT 2010 09 15 12 12 25 31.3200 -97.3300 251.000 457.0 126.466 2.790 -999.990 -999.990 1.265 ..P WKT 2010 09 15 12 12 55 31.3200 -97.3300 251.000 457.0 126.704 3.190 -999.990 -999.990 1.267 ..P WKT 2010 09 15 12 13 25 31.3200 -97.3300 251.000 457.0 130.466 3.680 -999.990 -999.990 1.305 ..P WKT 2010 09 15 12 13 55 31.3200 -97.3300 251.000 457.0 128.535 2.790 -999.990 -999.990 1.285 ..P WKT 2010 09 15 12 14 25 31.3200 -97.3300 251.000 457.0 123.351 3.390 -999.990 -999.990 1.234 ..P WKT 2010 09 15 12 14 55 31.3200 -97.3300 251.000 457.0 124.674 4.580 -999.990 -999.990 1.247 ..P WKT 2010 09 15 12 19 55 31.3200 -97.3300 251.000 30.0 134.372 3.750 -999.990 -999.990 1.344 ..P WKT 2010 09 15 12 24 55 31.3200 -97.3300 251.000 122.0 143.802 3.540 -999.990 -999.990 1.438 ..P WKT 2010 09 15 12 29 55 31.3200 -97.3300 251.000 457.0 121.777 3.250 -999.990 -999.990 1.218 ..P WKT 2010 09 15 12 34 55 31.3200 -97.3300 251.000 30.0 130.123 2.640 -999.990 -999.990 1.301 ..P WKT 2010 09 15 12 39 55 31.3200 -97.3300 251.000 122.0 133.318 1.980 -999.990 -999.990 1.333 ..P WKT 2010 09 15 12 44 55 31.3200 -97.3300 251.000 457.0 125.931 4.730 -999.990 -999.990 1.259 ..P WKT 2010 09 15 12 54 55 31.3200 -97.3300 251.000 30.0 133.972 2.370 -999.990 -999.990 1.340 ..P WKT 2010 09 15 12 59 55 31.3200 -97.3300 251.000 122.0 138.005 2.240 -999.990 -999.990 1.380 ..P WKT 2010 09 15 13 04 55 31.3200 -97.3300 251.000 457.0 119.506 2.370 -999.990 -999.990 1.195 ..P WKT 2010 09 15 13 09 55 31.3200 -97.3300 251.000 30.0 124.895 2.180 -999.990 -999.990 1.249 ..P WKT 2010 09 15 13 14 55 31.3200 -97.3300 251.000 122.0 135.718 2.240 -999.990 -999.990 1.357 ..P WKT 2010 09 15 13 19 55 31.3200 -97.3300 251.000 457.0 124.815 2.730 -999.990 -999.990 1.248 ..P WKT 2010 09 15 13 29 55 31.3200 -97.3300 251.000 30.0 133.041 3.680 -999.990 -999.990 1.330 ..P WKT 2010 09 15 13 34 55 31.3200 -97.3300 251.000 122.0 139.407 3.750 -999.990 -999.990 1.394 ..P WKT 2010 09 15 13 39 55 31.3200 -97.3300 251.000 457.0 128.654 3.120 -999.990 -999.990 1.287 ..P WKT 2010 09 15 13 44 55 31.3200 -97.3300 251.000 30.0 136.379 2.780 -999.990 -999.990 1.364 ..P WKT 2010 09 15 13 49 55 31.3200 -97.3300 251.000 122.0 134.458 3.570 -999.990 -999.990 1.345 ..P WKT 2010 09 15 13 54 55 31.3200 -97.3300 251.000 457.0 127.233 3.120 -999.990 -999.990 1.272 ..P WKT 2010 09 15 14 04 55 31.3200 -97.3300 251.000 30.0 137.080 2.960 -999.990 -999.990 1.371 ..P WKT 2010 09 15 14 09 55 31.3200 -97.3300 251.000 122.0 137.158 3.190 -999.990 -999.990 1.372 ..P WKT 2010 09 15 14 14 55 31.3200 -97.3300 251.000 457.0 130.435 3.600 -999.990 -999.990 1.304 ..P WKT 2010 09 15 14 19 55 31.3200 -97.3300 251.000 30.0 126.840 3.110 -999.990 -999.990 1.268 ..P WKT 2010 09 15 14 24 55 31.3200 -97.3300 251.000 122.0 140.387 4.400 -999.990 -999.990 1.404 ..P WKT 2010 09 15 14 29 55 31.3200 -97.3300 251.000 457.0 130.668 2.660 -999.990 -999.990 1.307 ..P WKT 2010 09 15 14 39 55 31.3200 -97.3300 251.000 30.0 136.423 2.690 -999.990 -999.990 1.364 ..P WKT 2010 09 15 14 44 55 31.3200 -97.3300 251.000 122.0 140.061 3.300 -999.990 -999.990 1.401 ..P WKT 2010 09 15 14 49 55 31.3200 -97.3300 251.000 457.0 132.261 4.140 -999.990 -999.990 1.323 ..P WKT 2010 09 15 14 54 55 31.3200 -97.3300 251.000 30.0 138.895 3.200 -999.990 -999.990 1.389 ..P WKT 2010 09 15 14 59 55 31.3200 -97.3300 251.000 122.0 135.315 3.780 -999.990 -999.990 1.353 ..P WKT 2010 09 15 15 04 55 31.3200 -97.3300 251.000 457.0 124.243 3.150 -999.990 -999.990 1.242 ..P WKT 2010 09 15 15 14 55 31.3200 -97.3300 251.000 30.0 133.506 3.160 -999.990 -999.990 1.335 ..P WKT 2010 09 15 15 19 55 31.3200 -97.3300 251.000 122.0 135.590 4.160 -999.990 -999.990 1.356 ..P WKT 2010 09 15 15 24 55 31.3200 -97.3300 251.000 457.0 132.494 3.380 -999.990 -999.990 1.325 ..P WKT 2010 09 15 15 29 55 31.3200 -97.3300 251.000 30.0 131.033 3.340 -999.990 -999.990 1.310 ..P WKT 2010 09 15 15 34 55 31.3200 -97.3300 251.000 122.0 137.070 2.750 -999.990 -999.990 1.371 ..P WKT 2010 09 15 15 39 55 31.3200 -97.3300 251.000 457.0 135.746 2.840 -999.990 -999.990 1.357 ..P WKT 2010 09 15 15 49 55 31.3200 -97.3300 251.000 30.0 139.469 2.820 -999.990 -999.990 1.395 ..P WKT 2010 09 15 15 54 55 31.3200 -97.3300 251.000 122.0 149.293 2.820 -999.990 -999.990 1.493 ..P WKT 2010 09 15 15 59 55 31.3200 -97.3300 251.000 457.0 140.562 3.660 -999.990 -999.990 1.406 ..P WKT 2010 09 15 16 04 55 31.3200 -97.3300 251.000 30.0 136.469 4.060 -999.990 -999.990 1.365 ..P WKT 2010 09 15 16 09 55 31.3200 -97.3300 251.000 122.0 144.386 4.700 -999.990 -999.990 1.444 ..P WKT 2010 09 15 16 14 55 31.3200 -97.3300 251.000 457.0 129.644 3.120 -999.990 -999.990 1.296 ..P WKT 2010 09 15 16 24 55 31.3200 -97.3300 251.000 30.0 134.715 3.540 -999.990 -999.990 1.347 ..P WKT 2010 09 15 16 29 55 31.3200 -97.3300 251.000 122.0 136.237 5.940 -999.990 -999.990 1.362 ..P WKT 2010 09 15 16 34 55 31.3200 -97.3300 251.000 457.0 133.115 3.480 -999.990 -999.990 1.331 ..P WKT 2010 09 15 16 39 55 31.3200 -97.3300 251.000 30.0 127.807 3.530 -999.990 -999.990 1.278 ..P WKT 2010 09 15 16 44 55 31.3200 -97.3300 251.000 122.0 129.055 3.370 -999.990 -999.990 1.291 ..P WKT 2010 09 15 16 49 55 31.3200 -97.3300 251.000 457.0 126.204 3.440 -999.990 -999.990 1.262 ..P WKT 2010 09 15 17 04 55 31.3200 -97.3300 251.000 30.0 117.402 3.960 -999.990 -999.990 1.174 ..P WKT 2010 09 15 17 09 55 31.3200 -97.3300 251.000 122.0 133.159 4.720 -999.990 -999.990 1.332 ..P WKT 2010 09 15 17 14 55 31.3200 -97.3300 251.000 457.0 133.877 4.410 -999.990 -999.990 1.339 ..P WKT 2010 09 15 17 19 55 31.3200 -97.3300 251.000 30.0 126.388 4.710 -999.990 -999.990 1.264 ..P WKT 2010 09 15 17 24 55 31.3200 -97.3300 251.000 122.0 131.756 4.950 -999.990 -999.990 1.318 ..P WKT 2010 09 15 17 29 55 31.3200 -97.3300 251.000 457.0 132.200 5.380 -999.990 -999.990 1.322 ..P WKT 2010 09 15 17 39 55 31.3200 -97.3300 251.000 30.0 135.186 5.760 -999.990 -999.990 1.352 ..P WKT 2010 09 15 17 44 55 31.3200 -97.3300 251.000 122.0 138.687 5.130 -999.990 -999.990 1.387 ..P WKT 2010 09 15 17 49 55 31.3200 -97.3300 251.000 457.0 137.671 4.750 -999.990 -999.990 1.377 ..P WKT 2010 09 15 17 54 55 31.3200 -97.3300 251.000 30.0 131.725 4.580 -999.990 -999.990 1.317 ..P WKT 2010 09 15 17 59 55 31.3200 -97.3300 251.000 122.0 136.459 4.820 -999.990 -999.990 1.365 ..P WKT 2010 09 15 18 04 55 31.3200 -97.3300 251.000 457.0 135.990 3.870 -999.990 -999.990 1.360 ..P WKT 2010 09 15 18 14 55 31.3200 -97.3300 251.000 30.0 131.861 4.720 -999.990 -999.990 1.319 ..P WKT 2010 09 15 18 19 55 31.3200 -97.3300 251.000 122.0 129.433 3.880 -999.990 -999.990 1.294 ..P WKT 2010 09 15 18 24 55 31.3200 -97.3300 251.000 457.0 121.524 4.850 -999.990 -999.990 1.215 ..P WKT 2010 09 15 18 29 55 31.3200 -97.3300 251.000 30.0 117.039 3.690 -999.990 -999.990 1.170 ..P WKT 2010 09 15 18 34 55 31.3200 -97.3300 251.000 122.0 126.671 4.150 -999.990 -999.990 1.267 ..P WKT 2010 09 15 18 39 55 31.3200 -97.3300 251.000 457.0 122.871 3.500 -999.990 -999.990 1.229 ..P WKT 2010 09 15 18 49 55 31.3200 -97.3300 251.000 30.0 122.985 4.480 -999.990 -999.990 1.230 ..P WKT 2010 09 15 18 54 55 31.3200 -97.3300 251.000 122.0 117.575 3.880 -999.990 -999.990 1.176 ..P WKT 2010 09 15 18 59 55 31.3200 -97.3300 251.000 457.0 116.690 3.700 -999.990 -999.990 1.167 ..P WKT 2010 09 15 19 04 55 31.3200 -97.3300 251.000 30.0 118.688 3.860 -999.990 -999.990 1.187 ..P WKT 2010 09 15 19 09 55 31.3200 -97.3300 251.000 122.0 117.529 4.380 -999.990 -999.990 1.175 ..P WKT 2010 09 15 19 14 55 31.3200 -97.3300 251.000 457.0 116.094 4.130 -999.990 -999.990 1.161 ..P WKT 2010 09 15 19 24 55 31.3200 -97.3300 251.000 30.0 109.245 4.860 -999.990 -999.990 1.092 ..P WKT 2010 09 15 19 29 55 31.3200 -97.3300 251.000 122.0 116.597 4.230 -999.990 -999.990 1.166 ..P WKT 2010 09 15 19 34 55 31.3200 -97.3300 251.000 457.0 111.866 4.010 -999.990 -999.990 1.119 ..P WKT 2010 09 15 19 39 55 31.3200 -97.3300 251.000 30.0 108.097 4.170 -999.990 -999.990 1.081 ..P WKT 2010 09 15 19 44 55 31.3200 -97.3300 251.000 122.0 114.627 3.800 -999.990 -999.990 1.146 ..P WKT 2010 09 15 19 49 55 31.3200 -97.3300 251.000 457.0 110.719 3.740 -999.990 -999.990 1.107 ..P WKT 2010 09 15 19 59 55 31.3200 -97.3300 251.000 30.0 112.538 3.660 -999.990 -999.990 1.125 ..P WKT 2010 09 15 20 04 55 31.3200 -97.3300 251.000 122.0 118.543 4.090 -999.990 -999.990 1.185 ..P WKT 2010 09 15 20 09 55 31.3200 -97.3300 251.000 457.0 117.677 3.640 -999.990 -999.990 1.177 ..P WKT 2010 09 15 20 14 55 31.3200 -97.3300 251.000 30.0 106.911 3.680 -999.990 -999.990 1.069 ..P WKT 2010 09 15 20 19 55 31.3200 -97.3300 251.000 122.0 121.444 4.360 -999.990 -999.990 1.214 ..P WKT 2010 09 15 20 24 55 31.3200 -97.3300 251.000 457.0 115.902 3.980 -999.990 -999.990 1.159 ..P WKT 2010 09 15 20 34 55 31.3200 -97.3300 251.000 30.0 120.456 4.200 -999.990 -999.990 1.205 ..P WKT 2010 09 15 20 39 55 31.3200 -97.3300 251.000 122.0 123.127 4.050 -999.990 -999.990 1.231 ..P WKT 2010 09 15 20 44 55 31.3200 -97.3300 251.000 457.0 124.148 4.710 -999.990 -999.990 1.241 ..P WKT 2010 09 15 20 49 55 31.3200 -97.3300 251.000 30.0 119.939 5.090 -999.990 -999.990 1.199 ..P WKT 2010 09 15 20 54 55 31.3200 -97.3300 251.000 122.0 129.769 5.210 -999.990 -999.990 1.298 ..P WKT 2010 09 15 20 59 55 31.3200 -97.3300 251.000 457.0 125.285 3.880 -999.990 -999.990 1.253 ..P WKT 2010 09 15 21 09 55 31.3200 -97.3300 251.000 30.0 119.085 4.530 -999.990 -999.990 1.191 ..P WKT 2010 09 15 21 14 55 31.3200 -97.3300 251.000 122.0 127.839 4.610 -999.990 -999.990 1.278 ..P WKT 2010 09 15 21 19 55 31.3200 -97.3300 251.000 457.0 115.657 4.850 -999.990 -999.990 1.157 ..P WKT 2010 09 15 21 24 55 31.3200 -97.3300 251.000 30.0 116.422 5.830 -999.990 -999.990 1.164 ..P WKT 2010 09 15 21 29 55 31.3200 -97.3300 251.000 122.0 121.872 5.070 -999.990 -999.990 1.219 ..P WKT 2010 09 15 21 34 55 31.3200 -97.3300 251.000 457.0 120.709 4.520 -999.990 -999.990 1.207 ..P WKT 2010 09 15 21 44 55 31.3200 -97.3300 251.000 30.0 111.882 4.380 -999.990 -999.990 1.119 ..P WKT 2010 09 15 21 49 55 31.3200 -97.3300 251.000 122.0 118.832 5.720 -999.990 -999.990 1.188 ..P WKT 2010 09 15 21 54 55 31.3200 -97.3300 251.000 457.0 119.165 6.140 -999.990 -999.990 1.192 ..P WKT 2010 09 15 21 59 55 31.3200 -97.3300 251.000 30.0 113.430 5.310 -999.990 -999.990 1.134 ..P WKT 2010 09 15 22 04 55 31.3200 -97.3300 251.000 122.0 125.624 4.530 -999.990 -999.990 1.256 ..P WKT 2010 09 15 22 09 55 31.3200 -97.3300 251.000 457.0 120.991 4.300 -999.990 -999.990 1.210 ..P WKT 2010 09 15 22 19 55 31.3200 -97.3300 251.000 30.0 117.262 4.250 -999.990 -999.990 1.173 ..P WKT 2010 09 15 22 24 55 31.3200 -97.3300 251.000 122.0 120.237 4.430 -999.990 -999.990 1.202 ..P WKT 2010 09 15 22 29 55 31.3200 -97.3300 251.000 457.0 119.486 5.370 -999.990 -999.990 1.195 ..P WKT 2010 09 15 22 34 55 31.3200 -97.3300 251.000 30.0 121.910 4.400 -999.990 -999.990 1.219 ..P WKT 2010 09 15 22 39 55 31.3200 -97.3300 251.000 122.0 129.581 4.760 -999.990 -999.990 1.296 ..P WKT 2010 09 15 22 44 55 31.3200 -97.3300 251.000 457.0 123.583 4.630 -999.990 -999.990 1.236 ..P WKT 2010 09 15 22 54 55 31.3200 -97.3300 251.000 30.0 115.035 4.150 -999.990 -999.990 1.150 ..P WKT 2010 09 15 22 59 55 31.3200 -97.3300 251.000 122.0 121.329 5.050 -999.990 -999.990 1.213 ..P WKT 2010 09 15 23 04 55 31.3200 -97.3300 251.000 457.0 122.097 4.960 -999.990 -999.990 1.221 ..P WKT 2010 09 15 23 09 55 31.3200 -97.3300 251.000 30.0 120.516 4.310 -999.990 -999.990 1.205 ..P WKT 2010 09 15 23 14 55 31.3200 -97.3300 251.000 122.0 125.016 4.360 -999.990 -999.990 1.250 ..P WKT 2010 09 15 23 19 55 31.3200 -97.3300 251.000 457.0 127.306 4.370 -999.990 -999.990 1.273 ..P WKT 2010 09 15 23 29 55 31.3200 -97.3300 251.000 30.0 119.622 4.450 -999.990 -999.990 1.196 ..P WKT 2010 09 15 23 34 55 31.3200 -97.3300 251.000 122.0 128.039 4.400 -999.990 -999.990 1.280 ..P WKT 2010 09 15 23 39 55 31.3200 -97.3300 251.000 457.0 118.062 4.330 -999.990 -999.990 1.181 ..P WKT 2010 09 15 23 44 55 31.3200 -97.3300 251.000 30.0 121.085 4.860 -999.990 -999.990 1.211 ..P WKT 2010 09 15 23 49 55 31.3200 -97.3300 251.000 122.0 129.092 4.840 -999.990 -999.990 1.291 ..P WKT 2010 09 16 00 09 55 31.3200 -97.3300 251.000 457.0 122.582 4.840 -999.990 -999.990 1.226 ..P WKT 2010 09 16 00 10 25 31.3200 -97.3300 251.000 457.0 122.541 4.740 -999.990 -999.990 1.225 ..P WKT 2010 09 16 00 10 55 31.3200 -97.3300 251.000 457.0 120.285 5.050 -999.990 -999.990 1.203 ..P WKT 2010 09 16 00 11 25 31.3200 -97.3300 251.000 457.0 118.583 4.950 -999.990 -999.990 1.186 ..P WKT 2010 09 16 00 11 55 31.3200 -97.3300 251.000 457.0 123.523 4.670 -999.990 -999.990 1.235 ..P WKT 2010 09 16 00 12 25 31.3200 -97.3300 251.000 457.0 120.991 4.760 -999.990 -999.990 1.210 ..P WKT 2010 09 16 00 12 55 31.3200 -97.3300 251.000 457.0 120.119 5.220 -999.990 -999.990 1.201 ..P WKT 2010 09 16 00 13 25 31.3200 -97.3300 251.000 457.0 123.953 6.460 -999.990 -999.990 1.240 ..P WKT 2010 09 16 00 13 55 31.3200 -97.3300 251.000 457.0 121.697 4.940 -999.990 -999.990 1.217 ..P WKT 2010 09 16 00 14 25 31.3200 -97.3300 251.000 457.0 119.441 4.710 -999.990 -999.990 1.194 ..P WKT 2010 09 16 00 14 55 31.3200 -97.3300 251.000 457.0 120.784 4.750 -999.990 -999.990 1.208 ..P WKT 2010 09 16 00 19 55 31.3200 -97.3300 251.000 30.0 127.287 4.610 -999.990 -999.990 1.273 ..P WKT 2010 09 16 00 24 55 31.3200 -97.3300 251.000 122.0 126.873 5.410 -999.990 -999.990 1.269 ..P WKT 2010 09 16 00 29 55 31.3200 -97.3300 251.000 457.0 124.245 4.970 -999.990 -999.990 1.242 ..P WKT 2010 09 16 00 34 55 31.3200 -97.3300 251.000 30.0 131.577 4.840 -999.990 -999.990 1.316 ..P WKT 2010 09 16 00 39 55 31.3200 -97.3300 251.000 122.0 125.629 5.160 -999.990 -999.990 1.256 ..P WKT 2010 09 16 00 44 55 31.3200 -97.3300 251.000 457.0 126.322 4.570 -999.990 -999.990 1.263 ..P WKT 2010 09 16 00 54 55 31.3200 -97.3300 251.000 30.0 132.244 4.530 -999.990 -999.990 1.322 ..P WKT 2010 09 16 00 59 55 31.3200 -97.3300 251.000 122.0 129.178 4.760 -999.990 -999.990 1.292 ..P WKT 2010 09 16 01 04 55 31.3200 -97.3300 251.000 457.0 115.605 4.990 -999.990 -999.990 1.156 ..P WKT 2010 09 16 01 09 55 31.3200 -97.3300 251.000 30.0 143.785 5.490 -999.990 -999.990 1.438 ..P WKT 2010 09 16 01 14 55 31.3200 -97.3300 251.000 122.0 120.259 5.510 -999.990 -999.990 1.203 ..P WKT 2010 09 16 01 19 55 31.3200 -97.3300 251.000 457.0 124.383 4.380 -999.990 -999.990 1.244 ..P WKT 2010 09 16 01 29 55 31.3200 -97.3300 251.000 30.0 134.523 4.440 -999.990 -999.990 1.345 ..P WKT 2010 09 16 01 34 55 31.3200 -97.3300 251.000 122.0 120.916 5.120 -999.990 -999.990 1.209 ..P WKT 2010 09 16 01 39 55 31.3200 -97.3300 251.000 457.0 124.585 5.480 -999.990 -999.990 1.246 ..P WKT 2010 09 16 01 44 55 31.3200 -97.3300 251.000 30.0 130.464 5.090 -999.990 -999.990 1.305 ..P WKT 2010 09 16 01 49 55 31.3200 -97.3300 251.000 122.0 118.656 5.030 -999.990 -999.990 1.187 ..P WKT 2010 09 16 01 54 55 31.3200 -97.3300 251.000 457.0 122.461 4.420 -999.990 -999.990 1.225 ..P WKT 2010 09 16 02 04 55 31.3200 -97.3300 251.000 30.0 150.318 4.190 -999.990 -999.990 1.503 ..P WKT 2010 09 16 02 09 55 31.3200 -97.3300 251.000 122.0 125.746 4.860 -999.990 -999.990 1.257 ..P WKT 2010 09 16 02 14 55 31.3200 -97.3300 251.000 457.0 123.690 5.520 -999.990 -999.990 1.237 ..P WKT 2010 09 16 02 19 55 31.3200 -97.3300 251.000 30.0 159.612 5.100 -999.990 -999.990 1.596 ..P WKT 2010 09 16 02 24 55 31.3200 -97.3300 251.000 122.0 126.898 4.050 -999.990 -999.990 1.269 ..P WKT 2010 09 16 02 29 55 31.3200 -97.3300 251.000 457.0 124.704 4.130 -999.990 -999.990 1.247 ..P WKT 2010 09 16 02 39 55 31.3200 -97.3300 251.000 30.0 183.846 4.460 -999.990 -999.990 1.838 ..P WKT 2010 09 16 02 44 55 31.3200 -97.3300 251.000 122.0 129.209 5.000 -999.990 -999.990 1.292 ..P WKT 2010 09 16 02 49 55 31.3200 -97.3300 251.000 457.0 124.137 4.570 -999.990 -999.990 1.241 ..P WKT 2010 09 16 02 54 55 31.3200 -97.3300 251.000 30.0 190.287 3.970 -999.990 -999.990 1.903 ..P WKT 2010 09 16 02 59 55 31.3200 -97.3300 251.000 122.0 132.765 3.730 -999.990 -999.990 1.328 ..P WKT 2010 09 16 03 04 55 31.3200 -97.3300 251.000 457.0 127.142 3.550 -999.990 -999.990 1.271 ..P WKT 2010 09 16 03 14 55 31.3200 -97.3300 251.000 30.0 131.490 5.360 -999.990 -999.990 1.315 ..P WKT 2010 09 16 03 19 55 31.3200 -97.3300 251.000 122.0 132.077 4.060 -999.990 -999.990 1.321 ..P WKT 2010 09 16 03 24 55 31.3200 -97.3300 251.000 457.0 130.319 4.840 -999.990 -999.990 1.303 ..P WKT 2010 09 16 03 29 55 31.3200 -97.3300 251.000 30.0 135.596 4.710 -999.990 -999.990 1.356 ..P WKT 2010 09 16 03 34 55 31.3200 -97.3300 251.000 122.0 135.493 4.130 -999.990 -999.990 1.355 ..P WKT 2010 09 16 03 39 55 31.3200 -97.3300 251.000 457.0 125.460 3.680 -999.990 -999.990 1.255 ..P WKT 2010 09 16 03 49 55 31.3200 -97.3300 251.000 30.0 130.732 3.790 -999.990 -999.990 1.307 ..P WKT 2010 09 16 03 54 55 31.3200 -97.3300 251.000 122.0 134.726 4.030 -999.990 -999.990 1.347 ..P WKT 2010 09 16 03 59 55 31.3200 -97.3300 251.000 457.0 127.966 4.040 -999.990 -999.990 1.280 ..P WKT 2010 09 16 04 04 55 31.3200 -97.3300 251.000 30.0 131.409 3.690 -999.990 -999.990 1.314 ..P WKT 2010 09 16 04 09 55 31.3200 -97.3300 251.000 122.0 133.472 3.770 -999.990 -999.990 1.335 ..P WKT 2010 09 16 04 14 55 31.3200 -97.3300 251.000 457.0 124.507 3.960 -999.990 -999.990 1.245 ..P WKT 2010 09 16 04 24 55 31.3200 -97.3300 251.000 30.0 130.761 4.110 -999.990 -999.990 1.308 ..P WKT 2010 09 16 04 29 55 31.3200 -97.3300 251.000 122.0 131.368 3.970 -999.990 -999.990 1.314 ..P WKT 2010 09 16 04 34 55 31.3200 -97.3300 251.000 457.0 129.217 3.830 -999.990 -999.990 1.292 ..P WKT 2010 09 16 04 39 55 31.3200 -97.3300 251.000 30.0 124.311 4.290 -999.990 -999.990 1.243 ..P WKT 2010 09 16 04 44 55 31.3200 -97.3300 251.000 122.0 134.562 4.020 -999.990 -999.990 1.346 ..P WKT 2010 09 16 04 49 55 31.3200 -97.3300 251.000 457.0 131.586 3.200 -999.990 -999.990 1.316 ..P WKT 2010 09 16 05 04 55 31.3200 -97.3300 251.000 30.0 131.671 3.370 -999.990 -999.990 1.317 ..P WKT 2010 09 16 05 09 55 31.3200 -97.3300 251.000 122.0 126.867 3.570 -999.990 -999.990 1.269 ..P WKT 2010 09 16 05 14 55 31.3200 -97.3300 251.000 457.0 142.169 3.820 -999.990 -999.990 1.422 ..P WKT 2010 09 16 05 19 55 31.3200 -97.3300 251.000 30.0 130.203 3.620 -999.990 -999.990 1.302 ..P WKT 2010 09 16 05 24 55 31.3200 -97.3300 251.000 122.0 127.051 3.400 -999.990 -999.990 1.271 ..P WKT 2010 09 16 05 29 55 31.3200 -97.3300 251.000 457.0 145.518 3.150 -999.990 -999.990 1.455 ..P WKT 2010 09 16 05 39 55 31.3200 -97.3300 251.000 30.0 136.185 3.880 -999.990 -999.990 1.362 ..P WKT 2010 09 16 05 44 55 31.3200 -97.3300 251.000 122.0 130.556 3.090 -999.990 -999.990 1.306 ..P WKT 2010 09 16 05 49 55 31.3200 -97.3300 251.000 457.0 141.308 3.390 -999.990 -999.990 1.413 ..P WKT 2010 09 16 05 54 55 31.3200 -97.3300 251.000 30.0 137.607 3.010 -999.990 -999.990 1.376 ..P WKT 2010 09 16 05 59 55 31.3200 -97.3300 251.000 122.0 132.529 2.800 -999.990 -999.990 1.325 ..P WKT 2010 09 16 06 04 55 31.3200 -97.3300 251.000 457.0 143.554 3.240 -999.990 -999.990 1.436 ..P WKT 2010 09 16 06 14 55 31.3200 -97.3300 251.000 30.0 123.809 3.370 -999.990 -999.990 1.238 ..P WKT 2010 09 16 06 19 55 31.3200 -97.3300 251.000 122.0 129.780 3.220 -999.990 -999.990 1.298 ..P WKT 2010 09 16 06 24 55 31.3200 -97.3300 251.000 457.0 148.545 4.390 -999.990 -999.990 1.485 ..P WKT 2010 09 16 06 29 55 31.3200 -97.3300 251.000 30.0 121.774 4.270 -999.990 -999.990 1.218 ..P WKT 2010 09 16 06 34 55 31.3200 -97.3300 251.000 122.0 118.803 3.880 -999.990 -999.990 1.188 ..P WKT 2010 09 16 06 39 55 31.3200 -97.3300 251.000 457.0 150.079 4.030 -999.990 -999.990 1.501 ..P WKT 2010 09 16 06 49 55 31.3200 -97.3300 251.000 30.0 126.357 4.010 -999.990 -999.990 1.264 ..P WKT 2010 09 16 06 54 55 31.3200 -97.3300 251.000 122.0 125.135 3.650 -999.990 -999.990 1.251 ..P WKT 2010 09 16 06 59 55 31.3200 -97.3300 251.000 457.0 114.977 4.480 -999.990 -999.990 1.150 ..P WKT 2010 09 16 07 04 55 31.3200 -97.3300 251.000 30.0 125.442 3.870 -999.990 -999.990 1.254 ..P WKT 2010 09 16 07 09 55 31.3200 -97.3300 251.000 122.0 129.032 3.140 -999.990 -999.990 1.290 ..P WKT 2010 09 16 07 14 55 31.3200 -97.3300 251.000 457.0 113.927 6.260 -999.990 -999.990 1.139 ..P WKT 2010 09 16 07 24 55 31.3200 -97.3300 251.000 30.0 117.416 3.640 -999.990 -999.990 1.174 ..P WKT 2010 09 16 07 29 55 31.3200 -97.3300 251.000 122.0 123.362 2.770 -999.990 -999.990 1.234 ..P WKT 2010 09 16 07 34 55 31.3200 -97.3300 251.000 457.0 113.916 3.270 -999.990 -999.990 1.139 ..P WKT 2010 09 16 07 39 55 31.3200 -97.3300 251.000 30.0 118.487 4.130 -999.990 -999.990 1.185 ..P WKT 2010 09 16 07 44 55 31.3200 -97.3300 251.000 122.0 123.881 3.760 -999.990 -999.990 1.239 ..P WKT 2010 09 16 07 49 55 31.3200 -97.3300 251.000 457.0 102.897 3.430 -999.990 -999.990 1.029 ..P WKT 2010 09 16 07 59 55 31.3200 -97.3300 251.000 30.0 118.670 3.610 -999.990 -999.990 1.187 ..P WKT 2010 09 16 08 04 55 31.3200 -97.3300 251.000 122.0 115.037 5.300 -999.990 -999.990 1.150 ..P WKT 2010 09 16 08 09 55 31.3200 -97.3300 251.000 457.0 108.933 3.880 -999.990 -999.990 1.089 ..P WKT 2010 09 16 08 14 55 31.3200 -97.3300 251.000 30.0 124.252 3.750 -999.990 -999.990 1.243 ..P WKT 2010 09 16 08 19 55 31.3200 -97.3300 251.000 122.0 124.739 3.460 -999.990 -999.990 1.247 ..P WKT 2010 09 16 08 24 55 31.3200 -97.3300 251.000 457.0 160.649 4.080 -999.990 -999.990 1.606 ..P WKT 2010 09 16 08 34 55 31.3200 -97.3300 251.000 30.0 127.885 3.400 -999.990 -999.990 1.279 ..P WKT 2010 09 16 08 39 55 31.3200 -97.3300 251.000 122.0 131.980 4.320 -999.990 -999.990 1.320 ..P WKT 2010 09 16 08 44 55 31.3200 -97.3300 251.000 457.0 162.976 3.370 -999.990 -999.990 1.630 ..P WKT 2010 09 16 08 49 55 31.3200 -97.3300 251.000 30.0 123.698 3.280 -999.990 -999.990 1.237 ..P WKT 2010 09 16 08 54 55 31.3200 -97.3300 251.000 122.0 131.634 3.870 -999.990 -999.990 1.316 ..P WKT 2010 09 16 08 59 55 31.3200 -97.3300 251.000 457.0 156.311 3.570 -999.990 -999.990 1.563 ..P WKT 2010 09 16 09 09 55 31.3200 -97.3300 251.000 30.0 132.895 4.130 -999.990 -999.990 1.329 ..P WKT 2010 09 16 09 14 55 31.3200 -97.3300 251.000 122.0 128.991 3.330 -999.990 -999.990 1.290 ..P WKT 2010 09 16 09 19 55 31.3200 -97.3300 251.000 457.0 156.364 3.630 -999.990 -999.990 1.564 ..P WKT 2010 09 16 09 24 55 31.3200 -97.3300 251.000 30.0 128.042 3.330 -999.990 -999.990 1.280 ..P WKT 2010 09 16 09 29 55 31.3200 -97.3300 251.000 122.0 132.506 3.540 -999.990 -999.990 1.325 ..P WKT 2010 09 16 09 34 55 31.3200 -97.3300 251.000 457.0 158.363 3.720 -999.990 -999.990 1.584 ..P WKT 2010 09 16 09 44 55 31.3200 -97.3300 251.000 30.0 134.980 3.340 -999.990 -999.990 1.350 ..P WKT 2010 09 16 09 49 55 31.3200 -97.3300 251.000 122.0 128.258 3.530 -999.990 -999.990 1.283 ..P WKT 2010 09 16 09 54 55 31.3200 -97.3300 251.000 457.0 146.899 3.100 -999.990 -999.990 1.469 ..P WKT 2010 09 16 09 59 55 31.3200 -97.3300 251.000 30.0 131.951 4.430 -999.990 -999.990 1.320 ..P WKT 2010 09 16 10 04 55 31.3200 -97.3300 251.000 122.0 132.907 4.110 -999.990 -999.990 1.329 ..P WKT 2010 09 16 10 09 55 31.3200 -97.3300 251.000 457.0 156.477 5.640 -999.990 -999.990 1.565 ..P WKT 2010 09 16 10 19 55 31.3200 -97.3300 251.000 30.0 128.685 2.320 -999.990 -999.990 1.287 ..P WKT 2010 09 16 10 24 55 31.3200 -97.3300 251.000 122.0 128.035 3.610 -999.990 -999.990 1.280 ..P WKT 2010 09 16 10 29 55 31.3200 -97.3300 251.000 457.0 153.281 3.730 -999.990 -999.990 1.533 ..P WKT 2010 09 16 10 34 55 31.3200 -97.3300 251.000 30.0 125.776 3.030 -999.990 -999.990 1.258 ..P WKT 2010 09 16 10 39 55 31.3200 -97.3300 251.000 122.0 120.332 3.000 -999.990 -999.990 1.203 ..P WKT 2010 09 16 10 44 55 31.3200 -97.3300 251.000 457.0 157.491 3.950 -999.990 -999.990 1.575 ..P WKT 2010 09 16 10 54 55 31.3200 -97.3300 251.000 30.0 122.279 3.620 -999.990 -999.990 1.223 ..P WKT 2010 09 16 10 59 55 31.3200 -97.3300 251.000 122.0 125.250 2.700 -999.990 -999.990 1.252 ..P WKT 2010 09 16 11 04 55 31.3200 -97.3300 251.000 457.0 146.569 3.390 -999.990 -999.990 1.466 ..P WKT 2010 09 16 11 09 55 31.3200 -97.3300 251.000 30.0 124.890 2.750 -999.990 -999.990 1.249 ..P WKT 2010 09 16 11 14 55 31.3200 -97.3300 251.000 122.0 121.288 2.670 -999.990 -999.990 1.213 ..P WKT 2010 09 16 11 19 55 31.3200 -97.3300 251.000 457.0 157.936 3.140 -999.990 -999.990 1.579 ..P WKT 2010 09 16 11 29 55 31.3200 -97.3300 251.000 30.0 127.242 2.660 -999.990 -999.990 1.272 ..P WKT 2010 09 16 11 34 55 31.3200 -97.3300 251.000 122.0 127.395 3.330 -999.990 -999.990 1.274 ..P WKT 2010 09 16 11 39 55 31.3200 -97.3300 251.000 457.0 154.919 4.450 -999.990 -999.990 1.549 ..P WKT 2010 09 16 11 44 55 31.3200 -97.3300 251.000 30.0 130.163 3.340 -999.990 -999.990 1.302 ..P WKT 2010 09 16 11 49 55 31.3200 -97.3300 251.000 122.0 121.010 2.640 -999.990 -999.990 1.210 ..P WKT 2010 09 16 12 09 55 31.3200 -97.3300 251.000 457.0 124.292 2.750 -999.990 -999.990 1.243 ..P WKT 2010 09 16 12 10 25 31.3200 -97.3300 251.000 457.0 128.959 3.780 -999.990 -999.990 1.290 ..P WKT 2010 09 16 12 10 55 31.3200 -97.3300 251.000 457.0 136.089 2.820 -999.990 -999.990 1.361 ..P WKT 2010 09 16 12 11 25 31.3200 -97.3300 251.000 457.0 131.180 3.080 -999.990 -999.990 1.312 ..P WKT 2010 09 16 12 11 55 31.3200 -97.3300 251.000 457.0 135.027 2.630 -999.990 -999.990 1.350 ..P WKT 2010 09 16 12 12 25 31.3200 -97.3300 251.000 457.0 136.137 2.750 -999.990 -999.990 1.361 ..P WKT 2010 09 16 12 12 55 31.3200 -97.3300 251.000 457.0 136.974 2.740 -999.990 -999.990 1.370 ..P WKT 2010 09 16 12 13 25 31.3200 -97.3300 251.000 457.0 135.348 3.630 -999.990 -999.990 1.353 ..P WKT 2010 09 16 12 13 55 31.3200 -97.3300 251.000 457.0 133.449 2.540 -999.990 -999.990 1.334 ..P WKT 2010 09 16 12 14 25 31.3200 -97.3300 251.000 457.0 132.918 2.480 -999.990 -999.990 1.329 ..P WKT 2010 09 16 12 14 55 31.3200 -97.3300 251.000 457.0 130.745 3.590 -999.990 -999.990 1.307 ..P WKT 2010 09 16 12 19 55 31.3200 -97.3300 251.000 30.0 124.338 2.340 -999.990 -999.990 1.243 ..P WKT 2010 09 16 12 24 55 31.3200 -97.3300 251.000 122.0 125.319 2.450 -999.990 -999.990 1.253 ..P WKT 2010 09 16 12 29 55 31.3200 -97.3300 251.000 457.0 154.751 2.430 -999.990 -999.990 1.548 ..P WKT 2010 09 16 12 34 55 31.3200 -97.3300 251.000 30.0 125.639 2.420 -999.990 -999.990 1.256 ..P WKT 2010 09 16 12 39 55 31.3200 -97.3300 251.000 122.0 139.477 2.060 -999.990 -999.990 1.395 ..P WKT 2010 09 16 12 44 55 31.3200 -97.3300 251.000 457.0 185.590 2.390 -999.990 -999.990 1.856 ..P WKT 2010 09 16 12 54 55 31.3200 -97.3300 251.000 30.0 138.385 2.320 -999.990 -999.990 1.384 ..P WKT 2010 09 16 12 59 55 31.3200 -97.3300 251.000 122.0 142.445 2.740 -999.990 -999.990 1.424 ..P WKT 2010 09 16 13 04 55 31.3200 -97.3300 251.000 457.0 179.050 3.300 -999.990 -999.990 1.791 ..P WKT 2010 09 16 13 09 55 31.3200 -97.3300 251.000 30.0 136.343 2.920 -999.990 -999.990 1.363 ..P WKT 2010 09 16 13 14 55 31.3200 -97.3300 251.000 122.0 184.157 3.400 -999.990 -999.990 1.842 ..P WKT 2010 09 16 13 19 55 31.3200 -97.3300 251.000 457.0 150.478 2.840 -999.990 -999.990 1.505 ..P WKT 2010 09 16 13 29 55 31.3200 -97.3300 251.000 30.0 140.939 3.400 -999.990 -999.990 1.409 ..P WKT 2010 09 16 13 34 55 31.3200 -97.3300 251.000 122.0 155.915 4.330 -999.990 -999.990 1.559 ..P WKT 2010 09 16 13 39 55 31.3200 -97.3300 251.000 457.0 164.191 4.880 -999.990 -999.990 1.642 ..P WKT 2010 09 16 13 44 55 31.3200 -97.3300 251.000 30.0 142.393 4.010 -999.990 -999.990 1.424 ..P WKT 2010 09 16 13 49 55 31.3200 -97.3300 251.000 122.0 128.252 2.850 -999.990 -999.990 1.283 ..P WKT 2010 09 16 13 54 55 31.3200 -97.3300 251.000 457.0 166.462 4.170 -999.990 -999.990 1.665 ..P WKT 2010 09 16 14 04 55 31.3200 -97.3300 251.000 30.0 136.229 3.380 -999.990 -999.990 1.362 ..P WKT 2010 09 16 14 09 55 31.3200 -97.3300 251.000 122.0 124.511 2.630 -999.990 -999.990 1.245 ..P WKT 2010 09 16 14 14 55 31.3200 -97.3300 251.000 457.0 154.613 3.830 -999.990 -999.990 1.546 ..P WKT 2010 09 16 14 19 55 31.3200 -97.3300 251.000 30.0 142.759 2.660 -999.990 -999.990 1.428 ..P WKT 2010 09 16 14 24 55 31.3200 -97.3300 251.000 122.0 130.906 4.830 -999.990 -999.990 1.309 ..P WKT 2010 09 16 14 29 55 31.3200 -97.3300 251.000 457.0 127.663 3.020 -999.990 -999.990 1.277 ..P WKT 2010 09 16 14 39 55 31.3200 -97.3300 251.000 30.0 132.614 3.800 -999.990 -999.990 1.326 ..P WKT 2010 09 16 14 44 55 31.3200 -97.3300 251.000 122.0 131.519 3.270 -999.990 -999.990 1.315 ..P WKT 2010 09 16 14 49 55 31.3200 -97.3300 251.000 457.0 109.247 2.990 -999.990 -999.990 1.092 ..P WKT 2010 09 16 14 54 55 31.3200 -97.3300 251.000 30.0 127.824 3.650 -999.990 -999.990 1.278 ..P WKT 2010 09 16 14 59 55 31.3200 -97.3300 251.000 122.0 131.646 2.750 -999.990 -999.990 1.316 ..P WKT 2010 09 16 15 04 55 31.3200 -97.3300 251.000 457.0 96.264 2.720 -999.990 -999.990 0.963 ..P WKT 2010 09 16 15 14 55 31.3200 -97.3300 251.000 30.0 123.851 2.500 -999.990 -999.990 1.239 ..P WKT 2010 09 16 15 19 55 31.3200 -97.3300 251.000 122.0 134.502 3.100 -999.990 -999.990 1.345 ..P WKT 2010 09 16 15 24 55 31.3200 -97.3300 251.000 457.0 92.844 2.260 -999.990 -999.990 0.928 ..P WKT 2010 09 16 15 29 55 31.3200 -97.3300 251.000 30.0 129.853 2.830 -999.990 -999.990 1.299 ..P WKT 2010 09 16 15 34 55 31.3200 -97.3300 251.000 122.0 141.730 2.870 -999.990 -999.990 1.417 ..P WKT 2010 09 16 15 39 55 31.3200 -97.3300 251.000 457.0 95.707 2.280 -999.990 -999.990 0.957 ..P WKT 2010 09 16 15 49 55 31.3200 -97.3300 251.000 30.0 145.913 2.750 -999.990 -999.990 1.459 ..P WKT 2010 09 16 15 54 55 31.3200 -97.3300 251.000 122.0 155.838 2.780 -999.990 -999.990 1.558 ..P WKT 2010 09 16 15 59 55 31.3200 -97.3300 251.000 457.0 97.769 3.110 -999.990 -999.990 0.978 ..P WKT 2010 09 16 16 04 55 31.3200 -97.3300 251.000 30.0 143.191 5.260 -999.990 -999.990 1.432 ..P WKT 2010 09 16 16 09 55 31.3200 -97.3300 251.000 122.0 148.200 3.630 -999.990 -999.990 1.482 ..P WKT 2010 09 16 16 14 55 31.3200 -97.3300 251.000 457.0 137.645 4.190 -999.990 -999.990 1.376 ..P WKT 2010 09 16 16 24 55 31.3200 -97.3300 251.000 30.0 138.223 4.350 -999.990 -999.990 1.382 ..P WKT 2010 09 16 16 29 55 31.3200 -97.3300 251.000 122.0 142.529 3.960 -999.990 -999.990 1.425 ..P WKT 2010 09 16 16 34 55 31.3200 -97.3300 251.000 457.0 132.095 4.000 -999.990 -999.990 1.321 ..P WKT 2010 09 16 16 39 55 31.3200 -97.3300 251.000 30.0 132.033 4.280 -999.990 -999.990 1.320 ..P WKT 2010 09 16 16 44 55 31.3200 -97.3300 251.000 122.0 138.249 3.960 -999.990 -999.990 1.382 ..P WKT 2010 09 16 16 49 55 31.3200 -97.3300 251.000 457.0 137.096 5.950 -999.990 -999.990 1.371 ..P WKT 2010 09 16 17 04 55 31.3200 -97.3300 251.000 30.0 122.217 4.380 -999.990 -999.990 1.222 ..P WKT 2010 09 16 17 09 55 31.3200 -97.3300 251.000 122.0 132.685 4.630 -999.990 -999.990 1.327 ..P WKT 2010 09 16 17 14 55 31.3200 -97.3300 251.000 457.0 119.137 4.670 -999.990 -999.990 1.191 ..P WKT 2010 09 16 17 19 55 31.3200 -97.3300 251.000 30.0 123.600 3.090 -999.990 -999.990 1.236 ..P WKT 2010 09 16 17 24 55 31.3200 -97.3300 251.000 122.0 132.429 2.720 -999.990 -999.990 1.324 ..P WKT 2010 09 16 17 29 55 31.3200 -97.3300 251.000 457.0 123.794 2.570 -999.990 -999.990 1.238 ..P WKT 2010 09 16 17 39 55 31.3200 -97.3300 251.000 30.0 122.759 4.280 -999.990 -999.990 1.228 ..P WKT 2010 09 16 17 44 55 31.3200 -97.3300 251.000 122.0 137.722 3.010 -999.990 -999.990 1.377 ..P WKT 2010 09 16 17 49 55 31.3200 -97.3300 251.000 457.0 124.449 5.260 -999.990 -999.990 1.244 ..P WKT 2010 09 16 17 54 55 31.3200 -97.3300 251.000 30.0 120.724 3.710 -999.990 -999.990 1.207 ..P WKT 2010 09 16 17 59 55 31.3200 -97.3300 251.000 122.0 126.820 4.470 -999.990 -999.990 1.268 ..P WKT 2010 09 16 18 04 55 31.3200 -97.3300 251.000 457.0 129.234 4.900 -999.990 -999.990 1.292 ..P WKT 2010 09 16 18 14 55 31.3200 -97.3300 251.000 30.0 120.150 4.260 -999.990 -999.990 1.202 ..P WKT 2010 09 16 18 19 55 31.3200 -97.3300 251.000 122.0 128.017 3.470 -999.990 -999.990 1.280 ..P WKT 2010 09 16 18 24 55 31.3200 -97.3300 251.000 457.0 123.339 3.040 -999.990 -999.990 1.233 ..P WKT 2010 09 16 18 29 55 31.3200 -97.3300 251.000 30.0 120.434 3.840 -999.990 -999.990 1.204 ..P WKT 2010 09 16 18 34 55 31.3200 -97.3300 251.000 122.0 129.664 3.740 -999.990 -999.990 1.297 ..P WKT 2010 09 16 18 39 55 31.3200 -97.3300 251.000 457.0 117.625 3.800 -999.990 -999.990 1.176 ..P WKT 2010 09 16 18 49 55 31.3200 -97.3300 251.000 30.0 115.380 3.490 -999.990 -999.990 1.154 ..P WKT 2010 09 16 18 54 55 31.3200 -97.3300 251.000 122.0 124.219 3.350 -999.990 -999.990 1.242 ..P WKT 2010 09 16 18 59 55 31.3200 -97.3300 251.000 457.0 119.562 3.260 -999.990 -999.990 1.196 ..P WKT 2010 09 16 19 04 55 31.3200 -97.3300 251.000 30.0 115.587 3.530 -999.990 -999.990 1.156 ..P WKT 2010 09 16 19 09 55 31.3200 -97.3300 251.000 122.0 117.747 2.530 -999.990 -999.990 1.177 ..P WKT 2010 09 16 19 14 55 31.3200 -97.3300 251.000 457.0 113.091 2.440 -999.990 -999.990 1.131 ..P WKT 2010 09 16 19 24 55 31.3200 -97.3300 251.000 30.0 111.392 3.820 -999.990 -999.990 1.114 ..P WKT 2010 09 16 19 29 55 31.3200 -97.3300 251.000 122.0 123.479 3.340 -999.990 -999.990 1.235 ..P WKT 2010 09 16 19 34 55 31.3200 -97.3300 251.000 457.0 117.033 3.250 -999.990 -999.990 1.170 ..P WKT 2010 09 16 19 39 55 31.3200 -97.3300 251.000 30.0 115.766 3.140 -999.990 -999.990 1.158 ..P WKT 2010 09 16 19 44 55 31.3200 -97.3300 251.000 122.0 123.491 3.290 -999.990 -999.990 1.235 ..P WKT 2010 09 16 19 49 55 31.3200 -97.3300 251.000 457.0 125.221 3.560 -999.990 -999.990 1.252 ..P WKT 2010 09 16 19 59 55 31.3200 -97.3300 251.000 30.0 115.756 3.790 -999.990 -999.990 1.158 ..P WKT 2010 09 16 20 04 55 31.3200 -97.3300 251.000 122.0 115.734 3.120 -999.990 -999.990 1.157 ..P WKT 2010 09 16 20 09 55 31.3200 -97.3300 251.000 457.0 112.988 3.180 -999.990 -999.990 1.130 ..P WKT 2010 09 16 20 14 55 31.3200 -97.3300 251.000 30.0 119.778 3.330 -999.990 -999.990 1.198 ..P WKT 2010 09 16 20 19 55 31.3200 -97.3300 251.000 122.0 127.384 3.580 -999.990 -999.990 1.274 ..P WKT 2010 09 16 20 24 55 31.3200 -97.3300 251.000 457.0 125.455 2.660 -999.990 -999.990 1.255 ..P WKT 2010 09 16 20 34 55 31.3200 -97.3300 251.000 30.0 123.931 3.270 -999.990 -999.990 1.239 ..P WKT 2010 09 16 20 39 55 31.3200 -97.3300 251.000 122.0 132.780 4.310 -999.990 -999.990 1.328 ..P WKT 2010 09 16 20 44 55 31.3200 -97.3300 251.000 457.0 125.015 5.390 -999.990 -999.990 1.250 ..P WKT 2010 09 16 20 49 55 31.3200 -97.3300 251.000 30.0 131.141 6.260 -999.990 -999.990 1.311 ..P WKT 2010 09 16 20 54 55 31.3200 -97.3300 251.000 122.0 139.171 4.710 -999.990 -999.990 1.392 ..P WKT 2010 09 16 20 59 55 31.3200 -97.3300 251.000 457.0 136.036 3.280 -999.990 -999.990 1.360 ..P WKT 2010 09 16 21 09 55 31.3200 -97.3300 251.000 30.0 124.418 3.210 -999.990 -999.990 1.244 ..P WKT 2010 09 16 21 14 55 31.3200 -97.3300 251.000 122.0 137.991 4.490 -999.990 -999.990 1.380 ..P WKT 2010 09 16 21 19 55 31.3200 -97.3300 251.000 457.0 128.964 5.550 -999.990 -999.990 1.290 ..P WKT 2010 09 16 21 24 55 31.3200 -97.3300 251.000 30.0 126.063 4.010 -999.990 -999.990 1.261 ..P WKT 2010 09 16 21 29 55 31.3200 -97.3300 251.000 122.0 132.691 3.710 -999.990 -999.990 1.327 ..P WKT 2010 09 16 21 34 55 31.3200 -97.3300 251.000 457.0 126.252 3.640 -999.990 -999.990 1.263 ..P WKT 2010 09 16 21 44 55 31.3200 -97.3300 251.000 30.0 121.541 4.340 -999.990 -999.990 1.215 ..P WKT 2010 09 16 21 49 55 31.3200 -97.3300 251.000 122.0 123.950 3.470 -999.990 -999.990 1.240 ..P WKT 2010 09 16 21 54 55 31.3200 -97.3300 251.000 457.0 123.499 3.770 -999.990 -999.990 1.235 ..P WKT 2010 09 16 21 59 55 31.3200 -97.3300 251.000 30.0 118.151 4.460 -999.990 -999.990 1.182 ..P WKT 2010 09 16 22 04 55 31.3200 -97.3300 251.000 122.0 121.919 3.600 -999.990 -999.990 1.219 ..P WKT 2010 09 16 22 09 55 31.3200 -97.3300 251.000 457.0 122.015 3.880 -999.990 -999.990 1.220 ..P WKT 2010 09 16 22 19 55 31.3200 -97.3300 251.000 30.0 114.060 3.830 -999.990 -999.990 1.141 ..P WKT 2010 09 16 22 24 55 31.3200 -97.3300 251.000 122.0 126.283 4.320 -999.990 -999.990 1.263 ..P WKT 2010 09 16 22 29 55 31.3200 -97.3300 251.000 457.0 120.682 5.720 -999.990 -999.990 1.207 ..P WKT 2010 09 16 22 34 55 31.3200 -97.3300 251.000 30.0 118.756 4.910 -999.990 -999.990 1.188 ..P WKT 2010 09 16 22 39 55 31.3200 -97.3300 251.000 122.0 130.025 4.190 -999.990 -999.990 1.300 ..P WKT 2010 09 16 22 44 55 31.3200 -97.3300 251.000 457.0 115.992 4.410 -999.990 -999.990 1.160 ..P WKT 2010 09 16 22 54 55 31.3200 -97.3300 251.000 30.0 115.793 4.350 -999.990 -999.990 1.158 ..P WKT 2010 09 16 22 59 55 31.3200 -97.3300 251.000 122.0 124.729 3.990 -999.990 -999.990 1.247 ..P WKT 2010 09 16 23 04 55 31.3200 -97.3300 251.000 457.0 123.734 4.430 -999.990 -999.990 1.237 ..P WKT 2010 09 16 23 09 55 31.3200 -97.3300 251.000 30.0 125.597 5.010 -999.990 -999.990 1.256 ..P WKT 2010 09 16 23 14 55 31.3200 -97.3300 251.000 122.0 137.794 3.640 -999.990 -999.990 1.378 ..P WKT 2010 09 16 23 19 55 31.3200 -97.3300 251.000 457.0 129.729 5.500 -999.990 -999.990 1.297 ..P WKT 2010 09 16 23 29 55 31.3200 -97.3300 251.000 30.0 135.002 3.650 -999.990 -999.990 1.350 ..P WKT 2010 09 16 23 34 55 31.3200 -97.3300 251.000 122.0 143.987 3.640 -999.990 -999.990 1.440 ..P WKT 2010 09 16 23 39 55 31.3200 -97.3300 251.000 457.0 136.656 4.020 -999.990 -999.990 1.367 ..P WKT 2010 09 16 23 44 55 31.3200 -97.3300 251.000 30.0 135.852 4.550 -999.990 -999.990 1.359 ..P WKT 2010 09 16 23 49 55 31.3200 -97.3300 251.000 122.0 139.670 3.410 -999.990 -999.990 1.397 ..P WKT 2010 09 17 00 09 55 31.3200 -97.3300 251.000 457.0 128.280 3.500 -999.990 -999.990 1.283 ..P WKT 2010 09 17 00 10 25 31.3200 -97.3300 251.000 457.0 133.740 3.510 -999.990 -999.990 1.337 ..P WKT 2010 09 17 00 10 55 31.3200 -97.3300 251.000 457.0 134.847 3.660 -999.990 -999.990 1.348 ..P WKT 2010 09 17 00 11 25 31.3200 -97.3300 251.000 457.0 134.596 3.710 -999.990 -999.990 1.346 ..P WKT 2010 09 17 00 11 55 31.3200 -97.3300 251.000 457.0 135.161 3.800 -999.990 -999.990 1.352 ..P WKT 2010 09 17 00 12 25 31.3200 -97.3300 251.000 457.0 138.716 4.290 -999.990 -999.990 1.387 ..P WKT 2010 09 17 00 12 55 31.3200 -97.3300 251.000 457.0 131.665 3.800 -999.990 -999.990 1.317 ..P WKT 2010 09 17 00 13 25 31.3200 -97.3300 251.000 457.0 129.238 4.080 -999.990 -999.990 1.292 ..P WKT 2010 09 17 00 13 55 31.3200 -97.3300 251.000 457.0 131.706 3.700 -999.990 -999.990 1.317 ..P WKT 2010 09 17 00 14 25 31.3200 -97.3300 251.000 457.0 136.350 4.310 -999.990 -999.990 1.363 ..P WKT 2010 09 17 00 14 55 31.3200 -97.3300 251.000 457.0 138.003 4.990 -999.990 -999.990 1.380 ..P WKT 2010 09 17 00 19 55 31.3200 -97.3300 251.000 30.0 137.391 3.730 -999.990 -999.990 1.374 ..P WKT 2010 09 17 00 24 55 31.3200 -97.3300 251.000 122.0 138.956 3.890 -999.990 -999.990 1.390 ..P WKT 2010 09 17 00 29 55 31.3200 -97.3300 251.000 457.0 136.711 3.960 -999.990 -999.990 1.367 ..P WKT 2010 09 17 00 34 55 31.3200 -97.3300 251.000 30.0 132.016 4.400 -999.990 -999.990 1.320 ..P WKT 2010 09 17 00 39 55 31.3200 -97.3300 251.000 122.0 147.463 4.270 -999.990 -999.990 1.475 ..P WKT 2010 09 17 00 44 55 31.3200 -97.3300 251.000 457.0 136.507 4.620 -999.990 -999.990 1.365 ..P WKT 2010 09 17 00 54 55 31.3200 -97.3300 251.000 30.0 131.558 4.150 -999.990 -999.990 1.316 ..P WKT 2010 09 17 00 59 55 31.3200 -97.3300 251.000 122.0 147.108 4.930 -999.990 -999.990 1.471 ..P WKT 2010 09 17 01 04 55 31.3200 -97.3300 251.000 457.0 133.782 4.430 -999.990 -999.990 1.338 ..P WKT 2010 09 17 01 09 55 31.3200 -97.3300 251.000 30.0 141.980 3.920 -999.990 -999.990 1.420 ..P WKT 2010 09 17 01 14 55 31.3200 -97.3300 251.000 122.0 170.213 4.490 -999.990 -999.990 1.702 ..P WKT 2010 09 17 01 19 55 31.3200 -97.3300 251.000 457.0 157.293 4.590 -999.990 -999.990 1.573 ..P WKT 2010 09 17 01 29 55 31.3200 -97.3300 251.000 30.0 153.528 4.310 -999.990 -999.990 1.535 ..P WKT 2010 09 17 01 34 55 31.3200 -97.3300 251.000 122.0 204.286 4.730 -999.990 -999.990 2.043 ..P WKT 2010 09 17 01 39 55 31.3200 -97.3300 251.000 457.0 189.725 5.730 -999.990 -999.990 1.897 ..P WKT 2010 09 17 01 44 55 31.3200 -97.3300 251.000 30.0 166.702 4.050 -999.990 -999.990 1.667 ..P WKT 2010 09 17 01 49 55 31.3200 -97.3300 251.000 122.0 148.719 4.050 -999.990 -999.990 1.487 ..P WKT 2010 09 17 01 54 55 31.3200 -97.3300 251.000 457.0 139.327 3.890 -999.990 -999.990 1.393 ..P WKT 2010 09 17 02 04 55 31.3200 -97.3300 251.000 30.0 152.401 5.080 -999.990 -999.990 1.524 ..P WKT 2010 09 17 02 09 55 31.3200 -97.3300 251.000 122.0 151.393 4.990 -999.990 -999.990 1.514 ..P WKT 2010 09 17 02 14 55 31.3200 -97.3300 251.000 457.0 132.631 3.890 -999.990 -999.990 1.326 ..P WKT 2010 09 17 02 19 55 31.3200 -97.3300 251.000 30.0 153.337 3.820 -999.990 -999.990 1.533 ..P WKT 2010 09 17 02 24 55 31.3200 -97.3300 251.000 122.0 143.995 4.020 -999.990 -999.990 1.440 ..P WKT 2010 09 17 02 29 55 31.3200 -97.3300 251.000 457.0 149.270 3.480 -999.990 -999.990 1.493 ..P WKT 2010 09 17 02 39 55 31.3200 -97.3300 251.000 30.0 159.864 4.030 -999.990 -999.990 1.599 ..P WKT 2010 09 17 02 44 55 31.3200 -97.3300 251.000 122.0 143.993 4.180 -999.990 -999.990 1.440 ..P WKT 2010 09 17 02 49 55 31.3200 -97.3300 251.000 457.0 140.013 4.340 -999.990 -999.990 1.400 ..P WKT 2010 09 17 02 54 55 31.3200 -97.3300 251.000 30.0 154.220 4.050 -999.990 -999.990 1.542 ..P WKT 2010 09 17 02 59 55 31.3200 -97.3300 251.000 122.0 140.528 4.020 -999.990 -999.990 1.405 ..P WKT 2010 09 17 03 04 55 31.3200 -97.3300 251.000 457.0 135.724 4.450 -999.990 -999.990 1.357 ..P WKT 2010 09 17 03 14 55 31.3200 -97.3300 251.000 30.0 136.082 4.260 -999.990 -999.990 1.361 ..P WKT 2010 09 17 03 19 55 31.3200 -97.3300 251.000 122.0 146.586 4.170 -999.990 -999.990 1.466 ..P WKT 2010 09 17 03 24 55 31.3200 -97.3300 251.000 457.0 137.927 4.000 -999.990 -999.990 1.379 ..P WKT 2010 09 17 03 29 55 31.3200 -97.3300 251.000 30.0 152.817 4.000 -999.990 -999.990 1.528 ..P WKT 2010 09 17 03 34 55 31.3200 -97.3300 251.000 122.0 148.264 4.120 -999.990 -999.990 1.483 ..P WKT 2010 09 17 03 39 55 31.3200 -97.3300 251.000 457.0 134.944 4.010 -999.990 -999.990 1.349 ..P WKT 2010 09 17 03 49 55 31.3200 -97.3300 251.000 30.0 170.263 5.320 -999.990 -999.990 1.703 ..P WKT 2010 09 17 03 54 55 31.3200 -97.3300 251.000 122.0 152.867 3.850 -999.990 -999.990 1.529 ..P WKT 2010 09 17 03 59 55 31.3200 -97.3300 251.000 457.0 141.770 5.100 -999.990 -999.990 1.418 ..P WKT 2010 09 17 04 04 55 31.3200 -97.3300 251.000 30.0 171.525 4.260 -999.990 -999.990 1.715 ..P WKT 2010 09 17 04 09 55 31.3200 -97.3300 251.000 122.0 146.990 5.870 -999.990 -999.990 1.470 ..P WKT 2010 09 17 04 14 55 31.3200 -97.3300 251.000 457.0 147.681 3.840 -999.990 -999.990 1.477 ..P WKT 2010 09 17 04 24 55 31.3200 -97.3300 251.000 30.0 166.702 4.000 -999.990 -999.990 1.667 ..P WKT 2010 09 17 04 29 55 31.3200 -97.3300 251.000 122.0 145.246 3.980 -999.990 -999.990 1.452 ..P WKT 2010 09 17 04 34 55 31.3200 -97.3300 251.000 457.0 144.368 4.150 -999.990 -999.990 1.444 ..P WKT 2010 09 17 04 39 55 31.3200 -97.3300 251.000 30.0 158.589 5.040 -999.990 -999.990 1.586 ..P WKT 2010 09 17 04 44 55 31.3200 -97.3300 251.000 122.0 143.985 3.580 -999.990 -999.990 1.440 ..P WKT 2010 09 17 04 49 55 31.3200 -97.3300 251.000 457.0 132.945 3.630 -999.990 -999.990 1.329 ..P WKT 2010 09 17 05 04 55 31.3200 -97.3300 251.000 30.0 171.231 3.730 -999.990 -999.990 1.712 ..P WKT 2010 09 17 05 09 55 31.3200 -97.3300 251.000 122.0 137.371 5.370 -999.990 -999.990 1.374 ..P WKT 2010 09 17 05 14 55 31.3200 -97.3300 251.000 457.0 140.331 4.950 -999.990 -999.990 1.403 ..P WKT 2010 09 17 05 19 55 31.3200 -97.3300 251.000 30.0 160.751 4.340 -999.990 -999.990 1.608 ..P WKT 2010 09 17 05 24 55 31.3200 -97.3300 251.000 122.0 133.195 4.840 -999.990 -999.990 1.332 ..P WKT 2010 09 17 05 29 55 31.3200 -97.3300 251.000 457.0 143.170 4.450 -999.990 -999.990 1.432 ..P WKT 2010 09 17 05 39 55 31.3200 -97.3300 251.000 30.0 173.120 5.050 -999.990 -999.990 1.731 ..P WKT 2010 09 17 05 44 55 31.3200 -97.3300 251.000 122.0 140.542 4.580 -999.990 -999.990 1.405 ..P WKT 2010 09 17 05 49 55 31.3200 -97.3300 251.000 457.0 144.556 4.730 -999.990 -999.990 1.446 ..P WKT 2010 09 17 05 54 55 31.3200 -97.3300 251.000 30.0 161.234 5.690 -999.990 -999.990 1.612 ..P WKT 2010 09 17 05 59 55 31.3200 -97.3300 251.000 122.0 134.969 4.470 -999.990 -999.990 1.350 ..P WKT 2010 09 17 06 04 55 31.3200 -97.3300 251.000 457.0 144.079 4.490 -999.990 -999.990 1.441 ..P WKT 2010 09 17 06 14 55 31.3200 -97.3300 251.000 30.0 135.391 5.030 -999.990 -999.990 1.354 ..P WKT 2010 09 17 06 19 55 31.3200 -97.3300 251.000 122.0 131.084 4.310 -999.990 -999.990 1.311 ..P WKT 2010 09 17 06 24 55 31.3200 -97.3300 251.000 457.0 158.328 4.140 -999.990 -999.990 1.583 ..P WKT 2010 09 17 06 29 55 31.3200 -97.3300 251.000 30.0 135.420 5.440 -999.990 -999.990 1.354 ..P WKT 2010 09 17 06 34 55 31.3200 -97.3300 251.000 122.0 130.146 4.400 -999.990 -999.990 1.301 ..P WKT 2010 09 17 06 39 55 31.3200 -97.3300 251.000 457.0 143.067 3.750 -999.990 -999.990 1.431 ..P WKT 2010 09 17 06 49 55 31.3200 -97.3300 251.000 30.0 141.323 3.850 -999.990 -999.990 1.413 ..P WKT 2010 09 17 06 54 55 31.3200 -97.3300 251.000 122.0 148.992 3.980 -999.990 -999.990 1.490 ..P WKT 2010 09 17 06 59 55 31.3200 -97.3300 251.000 457.0 135.143 3.770 -999.990 -999.990 1.351 ..P WKT 2010 09 17 07 04 55 31.3200 -97.3300 251.000 30.0 141.986 4.070 -999.990 -999.990 1.420 ..P WKT 2010 09 17 07 09 55 31.3200 -97.3300 251.000 122.0 139.723 3.850 -999.990 -999.990 1.397 ..P WKT 2010 09 17 07 14 55 31.3200 -97.3300 251.000 457.0 140.910 3.540 -999.990 -999.990 1.409 ..P WKT 2010 09 17 07 24 55 31.3200 -97.3300 251.000 30.0 148.394 4.020 -999.990 -999.990 1.484 ..P WKT 2010 09 17 07 29 55 31.3200 -97.3300 251.000 122.0 128.178 3.800 -999.990 -999.990 1.282 ..P WKT 2010 09 17 07 34 55 31.3200 -97.3300 251.000 457.0 127.844 4.510 -999.990 -999.990 1.278 ..P WKT 2010 09 17 07 39 55 31.3200 -97.3300 251.000 30.0 138.562 3.890 -999.990 -999.990 1.386 ..P WKT 2010 09 17 07 44 55 31.3200 -97.3300 251.000 122.0 129.939 4.710 -999.990 -999.990 1.299 ..P WKT 2010 09 17 07 49 55 31.3200 -97.3300 251.000 457.0 127.395 4.040 -999.990 -999.990 1.274 ..P WKT 2010 09 17 07 59 55 31.3200 -97.3300 251.000 30.0 151.137 4.370 -999.990 -999.990 1.511 ..P WKT 2010 09 17 08 04 55 31.3200 -97.3300 251.000 122.0 135.400 4.680 -999.990 -999.990 1.354 ..P WKT 2010 09 17 08 09 55 31.3200 -97.3300 251.000 457.0 135.976 4.440 -999.990 -999.990 1.360 ..P WKT 2010 09 17 08 14 55 31.3200 -97.3300 251.000 30.0 142.915 4.490 -999.990 -999.990 1.429 ..P WKT 2010 09 17 08 19 55 31.3200 -97.3300 251.000 122.0 133.808 4.410 -999.990 -999.990 1.338 ..P WKT 2010 09 17 08 24 55 31.3200 -97.3300 251.000 457.0 136.875 4.270 -999.990 -999.990 1.369 ..P WKT 2010 09 17 08 34 55 31.3200 -97.3300 251.000 30.0 146.966 4.670 -999.990 -999.990 1.470 ..P WKT 2010 09 17 08 39 55 31.3200 -97.3300 251.000 122.0 127.688 4.590 -999.990 -999.990 1.277 ..P WKT 2010 09 17 08 44 55 31.3200 -97.3300 251.000 457.0 134.990 4.200 -999.990 -999.990 1.350 ..P WKT 2010 09 17 08 49 55 31.3200 -97.3300 251.000 30.0 134.814 4.470 -999.990 -999.990 1.348 ..P WKT 2010 09 17 08 54 55 31.3200 -97.3300 251.000 122.0 118.848 4.070 -999.990 -999.990 1.188 ..P WKT 2010 09 17 08 59 55 31.3200 -97.3300 251.000 457.0 133.633 4.490 -999.990 -999.990 1.336 ..P WKT 2010 09 17 09 09 55 31.3200 -97.3300 251.000 30.0 131.283 3.980 -999.990 -999.990 1.313 ..P WKT 2010 09 17 09 14 55 31.3200 -97.3300 251.000 122.0 110.117 4.310 -999.990 -999.990 1.101 ..P WKT 2010 09 17 09 19 55 31.3200 -97.3300 251.000 457.0 139.684 5.410 -999.990 -999.990 1.397 ..P WKT 2010 09 17 09 24 55 31.3200 -97.3300 251.000 30.0 139.866 5.470 -999.990 -999.990 1.399 ..P WKT 2010 09 17 09 29 55 31.3200 -97.3300 251.000 122.0 114.947 4.890 -999.990 -999.990 1.149 ..P WKT 2010 09 17 09 34 55 31.3200 -97.3300 251.000 457.0 127.053 3.720 -999.990 -999.990 1.271 ..P WKT 2010 09 17 09 44 55 31.3200 -97.3300 251.000 30.0 159.547 5.500 -999.990 -999.990 1.595 ..P WKT 2010 09 17 09 49 55 31.3200 -97.3300 251.000 122.0 109.155 4.620 -999.990 -999.990 1.092 ..P WKT 2010 09 17 09 54 55 31.3200 -97.3300 251.000 457.0 132.315 4.910 -999.990 -999.990 1.323 ..P WKT 2010 09 17 09 59 55 31.3200 -97.3300 251.000 30.0 137.712 4.010 -999.990 -999.990 1.377 ..P WKT 2010 09 17 10 04 55 31.3200 -97.3300 251.000 122.0 109.785 3.180 -999.990 -999.990 1.098 ..P WKT 2010 09 17 10 09 55 31.3200 -97.3300 251.000 457.0 128.235 3.780 -999.990 -999.990 1.282 ..P WKT 2010 09 17 10 19 55 31.3200 -97.3300 251.000 30.0 140.386 3.760 -999.990 -999.990 1.404 ..P WKT 2010 09 17 10 24 55 31.3200 -97.3300 251.000 122.0 109.064 3.580 -999.990 -999.990 1.091 ..P WKT 2010 09 17 10 29 55 31.3200 -97.3300 251.000 457.0 126.932 3.990 -999.990 -999.990 1.269 ..P WKT 2010 09 17 10 34 55 31.3200 -97.3300 251.000 30.0 140.775 3.390 -999.990 -999.990 1.408 ..P WKT 2010 09 17 10 39 55 31.3200 -97.3300 251.000 122.0 99.287 3.450 -999.990 -999.990 0.993 ..P WKT 2010 09 17 10 44 55 31.3200 -97.3300 251.000 457.0 145.948 4.370 -999.990 -999.990 1.459 ..P WKT 2010 09 17 10 54 55 31.3200 -97.3300 251.000 30.0 136.201 3.630 -999.990 -999.990 1.362 ..P WKT 2010 09 17 10 59 55 31.3200 -97.3300 251.000 122.0 97.425 3.650 -999.990 -999.990 0.974 ..P WKT 2010 09 17 11 04 55 31.3200 -97.3300 251.000 457.0 128.911 3.780 -999.990 -999.990 1.289 ..P WKT 2010 09 17 11 09 55 31.3200 -97.3300 251.000 30.0 121.438 4.720 -999.990 -999.990 1.214 ..P WKT 2010 09 17 11 14 55 31.3200 -97.3300 251.000 122.0 99.761 4.050 -999.990 -999.990 0.998 ..P WKT 2010 09 17 11 19 55 31.3200 -97.3300 251.000 457.0 148.808 3.880 -999.990 -999.990 1.488 ..P WKT 2010 09 17 11 29 55 31.3200 -97.3300 251.000 30.0 132.582 3.930 -999.990 -999.990 1.326 ..P WKT 2010 09 17 11 34 55 31.3200 -97.3300 251.000 122.0 102.375 3.770 -999.990 -999.990 1.024 ..P WKT 2010 09 17 11 39 55 31.3200 -97.3300 251.000 457.0 145.446 5.410 -999.990 -999.990 1.454 ..P WKT 2010 09 17 11 44 55 31.3200 -97.3300 251.000 30.0 116.624 4.450 -999.990 -999.990 1.166 ..P WKT 2010 09 17 11 49 55 31.3200 -97.3300 251.000 122.0 93.367 4.930 -999.990 -999.990 0.934 ..P WKT 2010 09 17 12 09 55 31.3200 -97.3300 251.000 457.0 150.871 3.710 -999.990 -999.990 1.509 ..P WKT 2010 09 17 12 10 25 31.3200 -97.3300 251.000 457.0 150.608 4.130 -999.990 -999.990 1.506 ..P WKT 2010 09 17 12 10 55 31.3200 -97.3300 251.000 457.0 153.692 4.360 -999.990 -999.990 1.537 ..P WKT 2010 09 17 12 11 25 31.3200 -97.3300 251.000 457.0 143.390 4.410 -999.990 -999.990 1.434 ..P WKT 2010 09 17 12 11 55 31.3200 -97.3300 251.000 457.0 142.011 3.830 -999.990 -999.990 1.420 ..P WKT 2010 09 17 12 12 25 31.3200 -97.3300 251.000 457.0 138.402 3.920 -999.990 -999.990 1.384 ..P WKT 2010 09 17 12 12 55 31.3200 -97.3300 251.000 457.0 138.697 4.030 -999.990 -999.990 1.387 ..P WKT 2010 09 17 12 13 25 31.3200 -97.3300 251.000 457.0 136.761 3.630 -999.990 -999.990 1.368 ..P WKT 2010 09 17 12 13 55 31.3200 -97.3300 251.000 457.0 128.968 3.990 -999.990 -999.990 1.290 ..P WKT 2010 09 17 12 14 25 31.3200 -97.3300 251.000 457.0 133.167 3.900 -999.990 -999.990 1.332 ..P WKT 2010 09 17 12 14 55 31.3200 -97.3300 251.000 457.0 135.136 3.680 -999.990 -999.990 1.351 ..P WKT 2010 09 17 12 19 55 31.3200 -97.3300 251.000 30.0 161.791 4.630 -999.990 -999.990 1.618 ..P WKT 2010 09 17 12 24 55 31.3200 -97.3300 251.000 122.0 117.608 4.480 -999.990 -999.990 1.176 ..P WKT 2010 09 17 12 29 55 31.3200 -97.3300 251.000 457.0 124.184 4.640 -999.990 -999.990 1.242 ..P WKT 2010 09 17 12 34 55 31.3200 -97.3300 251.000 30.0 145.541 6.170 -999.990 -999.990 1.455 ..P WKT 2010 09 17 12 39 55 31.3200 -97.3300 251.000 122.0 115.860 5.880 -999.990 -999.990 1.159 ..P WKT 2010 09 17 12 44 55 31.3200 -97.3300 251.000 457.0 117.694 6.520 -999.990 -999.990 1.177 ..P WKT 2010 09 17 12 54 55 31.3200 -97.3300 251.000 30.0 144.019 5.780 -999.990 -999.990 1.440 ..P WKT 2010 09 17 12 59 55 31.3200 -97.3300 251.000 122.0 116.072 5.020 -999.990 -999.990 1.161 ..P WKT 2010 09 17 13 04 55 31.3200 -97.3300 251.000 457.0 113.647 4.830 -999.990 -999.990 1.136 ..P WKT 2010 09 17 13 09 55 31.3200 -97.3300 251.000 30.0 132.003 4.710 -999.990 -999.990 1.320 ..P WKT 2010 09 17 13 14 55 31.3200 -97.3300 251.000 122.0 120.931 4.370 -999.990 -999.990 1.209 ..P WKT 2010 09 17 13 19 55 31.3200 -97.3300 251.000 457.0 111.811 3.550 -999.990 -999.990 1.118 ..P WKT 2010 09 17 13 29 55 31.3200 -97.3300 251.000 30.0 147.887 4.360 -999.990 -999.990 1.479 ..P WKT 2010 09 17 13 34 55 31.3200 -97.3300 251.000 122.0 127.669 3.470 -999.990 -999.990 1.277 ..P WKT 2010 09 17 13 39 55 31.3200 -97.3300 251.000 457.0 99.360 3.770 -999.990 -999.990 0.994 ..P WKT 2010 09 17 13 44 55 31.3200 -97.3300 251.000 30.0 144.279 3.670 -999.990 -999.990 1.443 ..P WKT 2010 09 17 13 49 55 31.3200 -97.3300 251.000 122.0 110.948 3.910 -999.990 -999.990 1.109 ..P WKT 2010 09 17 13 54 55 31.3200 -97.3300 251.000 457.0 100.213 4.330 -999.990 -999.990 1.002 ..P WKT 2010 09 17 14 04 55 31.3200 -97.3300 251.000 30.0 123.997 4.390 -999.990 -999.990 1.240 ..P WKT 2010 09 17 14 09 55 31.3200 -97.3300 251.000 122.0 115.832 3.840 -999.990 -999.990 1.158 ..P WKT 2010 09 17 14 14 55 31.3200 -97.3300 251.000 457.0 100.413 3.790 -999.990 -999.990 1.004 ..P WKT 2010 09 17 14 19 55 31.3200 -97.3300 251.000 30.0 137.447 3.820 -999.990 -999.990 1.374 ..P WKT 2010 09 17 14 24 55 31.3200 -97.3300 251.000 122.0 115.192 3.970 -999.990 -999.990 1.152 ..P WKT 2010 09 17 14 29 55 31.3200 -97.3300 251.000 457.0 107.444 3.940 -999.990 -999.990 1.074 ..P WKT 2010 09 17 14 39 55 31.3200 -97.3300 251.000 30.0 129.538 4.510 -999.990 -999.990 1.295 ..P WKT 2010 09 17 14 44 55 31.3200 -97.3300 251.000 122.0 130.501 3.960 -999.990 -999.990 1.305 ..P WKT 2010 09 17 14 49 55 31.3200 -97.3300 251.000 457.0 129.510 5.400 -999.990 -999.990 1.295 ..P WKT 2010 09 17 14 54 55 31.3200 -97.3300 251.000 30.0 126.427 5.850 -999.990 -999.990 1.264 ..P WKT 2010 09 17 14 59 55 31.3200 -97.3300 251.000 122.0 122.506 4.620 -999.990 -999.990 1.225 ..P WKT 2010 09 17 15 04 55 31.3200 -97.3300 251.000 457.0 132.259 4.040 -999.990 -999.990 1.323 ..P WKT 2010 09 17 15 14 55 31.3200 -97.3300 251.000 30.0 127.945 4.060 -999.990 -999.990 1.279 ..P WKT 2010 09 17 15 19 55 31.3200 -97.3300 251.000 122.0 143.180 5.820 -999.990 -999.990 1.432 ..P WKT 2010 09 17 15 24 55 31.3200 -97.3300 251.000 457.0 138.044 5.660 -999.990 -999.990 1.380 ..P WKT 2010 09 17 15 29 55 31.3200 -97.3300 251.000 30.0 126.767 4.510 -999.990 -999.990 1.268 ..P WKT 2010 09 17 15 34 55 31.3200 -97.3300 251.000 122.0 138.654 4.100 -999.990 -999.990 1.387 ..P WKT 2010 09 17 15 39 55 31.3200 -97.3300 251.000 457.0 137.982 4.170 -999.990 -999.990 1.380 ..P WKT 2010 09 17 15 49 55 31.3200 -97.3300 251.000 30.0 131.535 5.920 -999.990 -999.990 1.315 ..P WKT 2010 09 17 15 54 55 31.3200 -97.3300 251.000 122.0 157.856 4.450 -999.990 -999.990 1.579 ..P WKT 2010 09 17 15 59 55 31.3200 -97.3300 251.000 457.0 133.940 4.580 -999.990 -999.990 1.339 ..P WKT 2010 09 17 16 04 55 31.3200 -97.3300 251.000 30.0 141.561 4.630 -999.990 -999.990 1.416 ..P WKT 2010 09 17 16 09 55 31.3200 -97.3300 251.000 122.0 145.834 4.950 -999.990 -999.990 1.458 ..P WKT 2010 09 17 16 14 55 31.3200 -97.3300 251.000 457.0 134.476 3.840 -999.990 -999.990 1.345 ..P WKT 2010 09 17 16 24 55 31.3200 -97.3300 251.000 30.0 130.381 3.650 -999.990 -999.990 1.304 ..P WKT 2010 09 17 16 29 55 31.3200 -97.3300 251.000 122.0 130.666 4.010 -999.990 -999.990 1.307 ..P WKT 2010 09 17 16 34 55 31.3200 -97.3300 251.000 457.0 116.435 5.040 -999.990 -999.990 1.164 ..P WKT 2010 09 17 16 39 55 31.3200 -97.3300 251.000 30.0 117.837 6.650 -999.990 -999.990 1.178 ..P WKT 2010 09 17 16 44 55 31.3200 -97.3300 251.000 122.0 134.033 5.570 -999.990 -999.990 1.340 ..P WKT 2010 09 17 16 49 55 31.3200 -97.3300 251.000 457.0 127.339 4.110 -999.990 -999.990 1.273 ..P WKT 2010 09 17 17 04 55 31.3200 -97.3300 251.000 30.0 131.230 5.400 -999.990 -999.990 1.312 ..P WKT 2010 09 17 17 09 55 31.3200 -97.3300 251.000 122.0 134.150 6.300 -999.990 -999.990 1.342 ..P WKT 2010 09 17 17 14 55 31.3200 -97.3300 251.000 457.0 119.621 6.340 -999.990 -999.990 1.196 ..P WKT 2010 09 17 17 19 55 31.3200 -97.3300 251.000 30.0 127.008 5.090 -999.990 -999.990 1.270 ..P WKT 2010 09 17 17 24 55 31.3200 -97.3300 251.000 122.0 130.067 3.390 -999.990 -999.990 1.301 ..P WKT 2010 09 17 17 29 55 31.3200 -97.3300 251.000 457.0 127.403 3.910 -999.990 -999.990 1.274 ..P WKT 2010 09 17 17 39 55 31.3200 -97.3300 251.000 30.0 116.628 3.630 -999.990 -999.990 1.166 ..P WKT 2010 09 17 17 44 55 31.3200 -97.3300 251.000 122.0 122.338 3.950 -999.990 -999.990 1.223 ..P WKT 2010 09 17 17 49 55 31.3200 -97.3300 251.000 457.0 112.412 4.450 -999.990 -999.990 1.124 ..P WKT 2010 09 17 17 54 55 31.3200 -97.3300 251.000 30.0 111.838 5.330 -999.990 -999.990 1.118 ..P WKT 2010 09 17 17 59 55 31.3200 -97.3300 251.000 122.0 117.827 5.570 -999.990 -999.990 1.178 ..P WKT 2010 09 17 18 04 55 31.3200 -97.3300 251.000 457.0 119.768 6.000 -999.990 -999.990 1.198 ..P WKT 2010 09 17 18 14 55 31.3200 -97.3300 251.000 30.0 121.635 6.140 -999.990 -999.990 1.216 ..P WKT 2010 09 17 18 19 55 31.3200 -97.3300 251.000 122.0 121.700 5.480 -999.990 -999.990 1.217 ..P WKT 2010 09 17 18 24 55 31.3200 -97.3300 251.000 457.0 118.415 4.850 -999.990 -999.990 1.184 ..P WKT 2010 09 17 18 29 55 31.3200 -97.3300 251.000 30.0 120.435 4.420 -999.990 -999.990 1.204 ..P WKT 2010 09 17 18 34 55 31.3200 -97.3300 251.000 122.0 129.158 4.520 -999.990 -999.990 1.292 ..P WKT 2010 09 17 18 39 55 31.3200 -97.3300 251.000 457.0 120.985 3.560 -999.990 -999.990 1.210 ..P WKT 2010 09 17 18 49 55 31.3200 -97.3300 251.000 30.0 110.145 4.150 -999.990 -999.990 1.101 ..P WKT 2010 09 17 18 54 55 31.3200 -97.3300 251.000 122.0 111.527 4.070 -999.990 -999.990 1.115 ..P WKT 2010 09 17 18 59 55 31.3200 -97.3300 251.000 457.0 110.815 4.160 -999.990 -999.990 1.108 ..P WKT 2010 09 17 19 04 55 31.3200 -97.3300 251.000 30.0 116.526 4.840 -999.990 -999.990 1.165 ..P WKT 2010 09 17 19 09 55 31.3200 -97.3300 251.000 122.0 116.651 4.130 -999.990 -999.990 1.167 ..P WKT 2010 09 17 19 14 55 31.3200 -97.3300 251.000 457.0 113.704 4.140 -999.990 -999.990 1.137 ..P WKT 2010 09 17 19 24 55 31.3200 -97.3300 251.000 30.0 114.074 3.900 -999.990 -999.990 1.141 ..P WKT 2010 09 17 19 29 55 31.3200 -97.3300 251.000 122.0 120.464 4.730 -999.990 -999.990 1.205 ..P WKT 2010 09 17 19 34 55 31.3200 -97.3300 251.000 457.0 112.889 5.900 -999.990 -999.990 1.129 ..P WKT 2010 09 17 19 39 55 31.3200 -97.3300 251.000 30.0 114.531 5.240 -999.990 -999.990 1.145 ..P WKT 2010 09 17 19 44 55 31.3200 -97.3300 251.000 122.0 118.686 4.040 -999.990 -999.990 1.187 ..P WKT 2010 09 17 19 49 55 31.3200 -97.3300 251.000 457.0 115.859 3.380 -999.990 -999.990 1.159 ..P WKT 2010 09 17 19 59 55 31.3200 -97.3300 251.000 30.0 118.224 3.770 -999.990 -999.990 1.182 ..P WKT 2010 09 17 20 04 55 31.3200 -97.3300 251.000 122.0 120.066 4.780 -999.990 -999.990 1.201 ..P WKT 2010 09 17 20 09 55 31.3200 -97.3300 251.000 457.0 125.539 4.690 -999.990 -999.990 1.255 ..P WKT 2010 09 17 20 14 55 31.3200 -97.3300 251.000 30.0 122.631 4.700 -999.990 -999.990 1.226 ..P WKT 2010 09 17 20 19 55 31.3200 -97.3300 251.000 122.0 126.987 4.110 -999.990 -999.990 1.270 ..P WKT 2010 09 17 20 24 55 31.3200 -97.3300 251.000 457.0 121.286 3.790 -999.990 -999.990 1.213 ..P WKT 2010 09 17 20 34 55 31.3200 -97.3300 251.000 30.0 115.032 4.080 -999.990 -999.990 1.150 ..P WKT 2010 09 17 20 39 55 31.3200 -97.3300 251.000 122.0 122.860 4.230 -999.990 -999.990 1.229 ..P WKT 2010 09 17 20 44 55 31.3200 -97.3300 251.000 457.0 117.278 4.010 -999.990 -999.990 1.173 ..P WKT 2010 09 17 20 49 55 31.3200 -97.3300 251.000 30.0 118.681 4.790 -999.990 -999.990 1.187 ..P WKT 2010 09 17 20 54 55 31.3200 -97.3300 251.000 122.0 123.995 3.950 -999.990 -999.990 1.240 ..P WKT 2010 09 17 20 59 55 31.3200 -97.3300 251.000 457.0 124.141 3.870 -999.990 -999.990 1.241 ..P WKT 2010 09 17 21 09 55 31.3200 -97.3300 251.000 30.0 120.161 4.910 -999.990 -999.990 1.202 ..P WKT 2010 09 17 21 14 55 31.3200 -97.3300 251.000 122.0 138.109 4.640 -999.990 -999.990 1.381 ..P WKT 2010 09 17 21 19 55 31.3200 -97.3300 251.000 457.0 127.418 4.410 -999.990 -999.990 1.274 ..P WKT 2010 09 17 21 24 55 31.3200 -97.3300 251.000 30.0 126.226 4.980 -999.990 -999.990 1.262 ..P WKT 2010 09 17 21 29 55 31.3200 -97.3300 251.000 122.0 128.946 4.450 -999.990 -999.990 1.289 ..P WKT 2010 09 17 21 34 55 31.3200 -97.3300 251.000 457.0 126.357 4.200 -999.990 -999.990 1.264 ..P WKT 2010 09 17 21 44 55 31.3200 -97.3300 251.000 30.0 120.660 3.760 -999.990 -999.990 1.207 ..P WKT 2010 09 17 21 49 55 31.3200 -97.3300 251.000 122.0 129.848 4.040 -999.990 -999.990 1.298 ..P WKT 2010 09 17 21 54 55 31.3200 -97.3300 251.000 457.0 119.474 4.440 -999.990 -999.990 1.195 ..P WKT 2010 09 17 21 59 55 31.3200 -97.3300 251.000 30.0 123.352 3.980 -999.990 -999.990 1.234 ..P WKT 2010 09 17 22 04 55 31.3200 -97.3300 251.000 122.0 123.178 4.460 -999.990 -999.990 1.232 ..P WKT 2010 09 17 22 09 55 31.3200 -97.3300 251.000 457.0 123.423 3.090 -999.990 -999.990 1.234 ..P WKT 2010 09 17 22 19 55 31.3200 -97.3300 251.000 30.0 129.504 3.220 -999.990 -999.990 1.295 ..P WKT 2010 09 17 22 24 55 31.3200 -97.3300 251.000 122.0 131.008 3.680 -999.990 -999.990 1.310 ..P WKT 2010 09 17 22 29 55 31.3200 -97.3300 251.000 457.0 123.985 4.530 -999.990 -999.990 1.240 ..P WKT 2010 09 17 22 34 55 31.3200 -97.3300 251.000 30.0 120.737 3.590 -999.990 -999.990 1.207 ..P WKT 2010 09 17 22 39 55 31.3200 -97.3300 251.000 122.0 128.110 3.100 -999.990 -999.990 1.281 ..P WKT 2010 09 17 22 44 55 31.3200 -97.3300 251.000 457.0 122.486 3.340 -999.990 -999.990 1.225 ..P WKT 2010 09 17 22 54 55 31.3200 -97.3300 251.000 30.0 123.975 3.440 -999.990 -999.990 1.240 ..P WKT 2010 09 17 22 59 55 31.3200 -97.3300 251.000 122.0 132.207 4.020 -999.990 -999.990 1.322 ..P WKT 2010 09 17 23 04 55 31.3200 -97.3300 251.000 457.0 130.655 3.980 -999.990 -999.990 1.307 ..P WKT 2010 09 17 23 09 55 31.3200 -97.3300 251.000 30.0 128.545 4.450 -999.990 -999.990 1.285 ..P WKT 2010 09 17 23 14 55 31.3200 -97.3300 251.000 122.0 137.336 4.400 -999.990 -999.990 1.373 ..P WKT 2010 09 17 23 19 55 31.3200 -97.3300 251.000 457.0 124.044 3.840 -999.990 -999.990 1.240 ..P WKT 2010 09 17 23 29 55 31.3200 -97.3300 251.000 30.0 114.600 3.530 -999.990 -999.990 1.146 ..P WKT 2010 09 17 23 34 55 31.3200 -97.3300 251.000 122.0 124.321 3.850 -999.990 -999.990 1.243 ..P WKT 2010 09 17 23 39 55 31.3200 -97.3300 251.000 457.0 117.268 4.180 -999.990 -999.990 1.173 ..P WKT 2010 09 17 23 44 55 31.3200 -97.3300 251.000 30.0 123.913 4.120 -999.990 -999.990 1.239 ..P WKT 2010 09 17 23 49 55 31.3200 -97.3300 251.000 122.0 130.000 3.240 -999.990 -999.990 1.300 ..P WKT 2010 09 18 00 09 55 31.3200 -97.3300 251.000 457.0 130.442 3.160 -999.990 -999.990 1.304 ..P WKT 2010 09 18 00 10 25 31.3200 -97.3300 251.000 457.0 127.880 3.150 -999.990 -999.990 1.279 ..P WKT 2010 09 18 00 10 55 31.3200 -97.3300 251.000 457.0 129.790 3.190 -999.990 -999.990 1.298 ..P WKT 2010 09 18 00 11 25 31.3200 -97.3300 251.000 457.0 126.670 3.260 -999.990 -999.990 1.267 ..P WKT 2010 09 18 00 11 55 31.3200 -97.3300 251.000 457.0 129.698 3.420 -999.990 -999.990 1.297 ..P WKT 2010 09 18 00 12 25 31.3200 -97.3300 251.000 457.0 130.490 3.430 -999.990 -999.990 1.305 ..P WKT 2010 09 18 00 12 55 31.3200 -97.3300 251.000 457.0 131.003 3.990 -999.990 -999.990 1.310 ..P WKT 2010 09 18 00 13 25 31.3200 -97.3300 251.000 457.0 129.559 3.440 -999.990 -999.990 1.296 ..P WKT 2010 09 18 00 13 55 31.3200 -97.3300 251.000 457.0 127.557 3.350 -999.990 -999.990 1.276 ..P WKT 2010 09 18 00 14 25 31.3200 -97.3300 251.000 457.0 124.995 3.410 -999.990 -999.990 1.250 ..P WKT 2010 09 18 00 14 55 31.3200 -97.3300 251.000 457.0 131.098 3.260 -999.990 -999.990 1.311 ..P WKT 2010 09 18 00 19 55 31.3200 -97.3300 251.000 30.0 133.989 3.350 -999.990 -999.990 1.340 ..P WKT 2010 09 18 00 24 55 31.3200 -97.3300 251.000 122.0 124.027 3.370 -999.990 -999.990 1.240 ..P WKT 2010 09 18 00 29 55 31.3200 -97.3300 251.000 457.0 129.992 4.800 -999.990 -999.990 1.300 ..P WKT 2010 09 18 00 34 55 31.3200 -97.3300 251.000 30.0 117.797 3.620 -999.990 -999.990 1.178 ..P WKT 2010 09 18 00 39 55 31.3200 -97.3300 251.000 122.0 125.717 3.920 -999.990 -999.990 1.257 ..P WKT 2010 09 18 00 44 55 31.3200 -97.3300 251.000 457.0 128.049 4.120 -999.990 -999.990 1.280 ..P WKT 2010 09 18 00 54 55 31.3200 -97.3300 251.000 30.0 122.510 4.130 -999.990 -999.990 1.225 ..P WKT 2010 09 18 00 59 55 31.3200 -97.3300 251.000 122.0 125.531 3.780 -999.990 -999.990 1.255 ..P WKT 2010 09 18 01 04 55 31.3200 -97.3300 251.000 457.0 116.686 4.270 -999.990 -999.990 1.167 ..P WKT 2010 09 18 01 09 55 31.3200 -97.3300 251.000 30.0 126.545 3.820 -999.990 -999.990 1.265 ..P WKT 2010 09 18 01 14 55 31.3200 -97.3300 251.000 122.0 132.077 3.900 -999.990 -999.990 1.321 ..P WKT 2010 09 18 01 19 55 31.3200 -97.3300 251.000 457.0 122.955 4.360 -999.990 -999.990 1.230 ..P WKT 2010 09 18 01 29 55 31.3200 -97.3300 251.000 30.0 109.898 3.840 -999.990 -999.990 1.099 ..P WKT 2010 09 18 01 34 55 31.3200 -97.3300 251.000 122.0 114.751 3.640 -999.990 -999.990 1.148 ..P WKT 2010 09 18 01 39 55 31.3200 -97.3300 251.000 457.0 125.463 3.240 -999.990 -999.990 1.255 ..P WKT 2010 09 18 01 44 55 31.3200 -97.3300 251.000 30.0 110.508 4.930 -999.990 -999.990 1.105 ..P WKT 2010 09 18 01 49 55 31.3200 -97.3300 251.000 122.0 113.268 3.580 -999.990 -999.990 1.133 ..P WKT 2010 09 18 01 54 55 31.3200 -97.3300 251.000 457.0 129.414 3.570 -999.990 -999.990 1.294 ..P WKT 2010 09 18 02 04 55 31.3200 -97.3300 251.000 30.0 110.590 3.470 -999.990 -999.990 1.106 ..P WKT 2010 09 18 02 09 55 31.3200 -97.3300 251.000 122.0 115.778 3.670 -999.990 -999.990 1.158 ..P WKT 2010 09 18 02 14 55 31.3200 -97.3300 251.000 457.0 129.468 4.570 -999.990 -999.990 1.295 ..P WKT 2010 09 18 02 19 55 31.3200 -97.3300 251.000 30.0 113.050 5.120 -999.990 -999.990 1.131 ..P WKT 2010 09 18 02 24 55 31.3200 -97.3300 251.000 122.0 111.827 4.270 -999.990 -999.990 1.118 ..P WKT 2010 09 18 02 29 55 31.3200 -97.3300 251.000 457.0 128.578 3.360 -999.990 -999.990 1.286 ..P WKT 2010 09 18 02 39 55 31.3200 -97.3300 251.000 30.0 115.679 3.510 -999.990 -999.990 1.157 ..P WKT 2010 09 18 02 44 55 31.3200 -97.3300 251.000 122.0 119.191 4.500 -999.990 -999.990 1.192 ..P WKT 2010 09 18 02 49 55 31.3200 -97.3300 251.000 457.0 127.299 5.150 -999.990 -999.990 1.273 ..P WKT 2010 09 18 02 54 55 31.3200 -97.3300 251.000 30.0 115.769 4.740 -999.990 -999.990 1.158 ..P WKT 2010 09 18 02 59 55 31.3200 -97.3300 251.000 122.0 113.153 4.050 -999.990 -999.990 1.132 ..P WKT 2010 09 18 03 04 55 31.3200 -97.3300 251.000 457.0 112.766 3.210 -999.990 -999.990 1.128 ..P WKT 2010 09 18 03 14 55 31.3200 -97.3300 251.000 30.0 108.550 3.710 -999.990 -999.990 1.085 ..P WKT 2010 09 18 03 19 55 31.3200 -97.3300 251.000 122.0 115.302 4.030 -999.990 -999.990 1.153 ..P WKT 2010 09 18 03 24 55 31.3200 -97.3300 251.000 457.0 120.660 5.080 -999.990 -999.990 1.207 ..P WKT 2010 09 18 03 29 55 31.3200 -97.3300 251.000 30.0 118.781 3.800 -999.990 -999.990 1.188 ..P WKT 2010 09 18 03 34 55 31.3200 -97.3300 251.000 122.0 109.110 2.870 -999.990 -999.990 1.091 ..P WKT 2010 09 18 03 39 55 31.3200 -97.3300 251.000 457.0 212.969 4.320 -999.990 -999.990 2.130 ..P WKT 2010 09 18 03 49 55 31.3200 -97.3300 251.000 30.0 114.885 4.240 -999.990 -999.990 1.149 ..P WKT 2010 09 18 03 54 55 31.3200 -97.3300 251.000 122.0 116.067 3.300 -999.990 -999.990 1.161 ..P WKT 2010 09 18 03 59 55 31.3200 -97.3300 251.000 457.0 202.636 5.000 -999.990 -999.990 2.026 ..P WKT 2010 09 18 04 04 55 31.3200 -97.3300 251.000 30.0 126.774 4.870 -999.990 -999.990 1.268 ..P WKT 2010 09 18 04 09 55 31.3200 -97.3300 251.000 122.0 118.779 4.390 -999.990 -999.990 1.188 ..P WKT 2010 09 18 04 14 55 31.3200 -97.3300 251.000 457.0 133.306 3.620 -999.990 -999.990 1.333 ..P WKT 2010 09 18 04 24 55 31.3200 -97.3300 251.000 30.0 125.161 4.080 -999.990 -999.990 1.252 ..P WKT 2010 09 18 04 29 55 31.3200 -97.3300 251.000 122.0 112.225 3.650 -999.990 -999.990 1.122 ..P WKT 2010 09 18 04 34 55 31.3200 -97.3300 251.000 457.0 148.207 4.730 -999.990 -999.990 1.482 ..P WKT 2010 09 18 04 39 55 31.3200 -97.3300 251.000 30.0 113.874 4.250 -999.990 -999.990 1.139 ..P WKT 2010 09 18 04 44 55 31.3200 -97.3300 251.000 122.0 115.948 3.560 -999.990 -999.990 1.159 ..P WKT 2010 09 18 04 49 55 31.3200 -97.3300 251.000 457.0 124.551 3.230 -999.990 -999.990 1.246 ..P WKT 2010 09 18 05 04 55 31.3200 -97.3300 251.000 30.0 116.880 3.540 -999.990 -999.990 1.169 ..P WKT 2010 09 18 05 09 55 31.3200 -97.3300 251.000 122.0 125.827 3.830 -999.990 -999.990 1.258 ..P WKT 2010 09 18 05 14 55 31.3200 -97.3300 251.000 457.0 123.664 4.610 -999.990 -999.990 1.237 ..P WKT 2010 09 18 05 19 55 31.3200 -97.3300 251.000 30.0 113.450 5.780 -999.990 -999.990 1.135 ..P WKT 2010 09 18 05 24 55 31.3200 -97.3300 251.000 122.0 117.535 4.140 -999.990 -999.990 1.175 ..P WKT 2010 09 18 05 29 55 31.3200 -97.3300 251.000 457.0 123.285 4.600 -999.990 -999.990 1.233 ..P WKT 2010 09 18 05 39 55 31.3200 -97.3300 251.000 30.0 121.291 4.680 -999.990 -999.990 1.213 ..P WKT 2010 09 18 05 44 55 31.3200 -97.3300 251.000 122.0 116.881 5.310 -999.990 -999.990 1.169 ..P WKT 2010 09 18 05 49 55 31.3200 -97.3300 251.000 457.0 115.800 4.020 -999.990 -999.990 1.158 ..P WKT 2010 09 18 05 54 55 31.3200 -97.3300 251.000 30.0 121.379 4.380 -999.990 -999.990 1.214 ..P WKT 2010 09 18 05 59 55 31.3200 -97.3300 251.000 122.0 121.547 4.950 -999.990 -999.990 1.215 ..P WKT 2010 09 18 06 04 55 31.3200 -97.3300 251.000 457.0 124.766 4.530 -999.990 -999.990 1.248 ..P WKT 2010 09 18 06 14 55 31.3200 -97.3300 251.000 30.0 122.624 4.070 -999.990 -999.990 1.226 ..P WKT 2010 09 18 06 19 55 31.3200 -97.3300 251.000 122.0 120.316 3.970 -999.990 -999.990 1.203 ..P WKT 2010 09 18 06 24 55 31.3200 -97.3300 251.000 457.0 119.949 3.670 -999.990 -999.990 1.199 ..P WKT 2010 09 18 06 29 55 31.3200 -97.3300 251.000 30.0 117.642 3.760 -999.990 -999.990 1.176 ..P WKT 2010 09 18 06 34 55 31.3200 -97.3300 251.000 122.0 113.118 3.370 -999.990 -999.990 1.131 ..P WKT 2010 09 18 06 39 55 31.3200 -97.3300 251.000 457.0 117.047 3.050 -999.990 -999.990 1.170 ..P WKT 2010 09 18 06 49 55 31.3200 -97.3300 251.000 30.0 117.146 3.020 -999.990 -999.990 1.171 ..P WKT 2010 09 18 06 54 55 31.3200 -97.3300 251.000 122.0 118.443 3.360 -999.990 -999.990 1.184 ..P WKT 2010 09 18 06 59 55 31.3200 -97.3300 251.000 457.0 129.158 4.660 -999.990 -999.990 1.292 ..P WKT 2010 09 18 07 04 55 31.3200 -97.3300 251.000 30.0 125.744 3.780 -999.990 -999.990 1.257 ..P WKT 2010 09 18 07 09 55 31.3200 -97.3300 251.000 122.0 117.621 3.250 -999.990 -999.990 1.176 ..P WKT 2010 09 18 07 14 55 31.3200 -97.3300 251.000 457.0 119.747 4.350 -999.990 -999.990 1.197 ..P WKT 2010 09 18 07 24 55 31.3200 -97.3300 251.000 30.0 119.252 4.050 -999.990 -999.990 1.193 ..P WKT 2010 09 18 07 29 55 31.3200 -97.3300 251.000 122.0 109.433 3.530 -999.990 -999.990 1.094 ..P WKT 2010 09 18 07 34 55 31.3200 -97.3300 251.000 457.0 122.593 3.700 -999.990 -999.990 1.226 ..P WKT 2010 09 18 07 39 55 31.3200 -97.3300 251.000 30.0 119.696 4.530 -999.990 -999.990 1.197 ..P WKT 2010 09 18 07 44 55 31.3200 -97.3300 251.000 122.0 116.522 4.220 -999.990 -999.990 1.165 ..P WKT 2010 09 18 07 49 55 31.3200 -97.3300 251.000 457.0 126.080 3.840 -999.990 -999.990 1.261 ..P WKT 2010 09 18 07 59 55 31.3200 -97.3300 251.000 30.0 120.129 3.440 -999.990 -999.990 1.201 ..P WKT 2010 09 18 08 04 55 31.3200 -97.3300 251.000 122.0 119.012 4.190 -999.990 -999.990 1.190 ..P WKT 2010 09 18 08 09 55 31.3200 -97.3300 251.000 457.0 129.514 5.890 -999.990 -999.990 1.295 ..P WKT 2010 09 18 08 14 55 31.3200 -97.3300 251.000 30.0 122.311 7.030 -999.990 -999.990 1.223 ..P WKT 2010 09 18 08 19 55 31.3200 -97.3300 251.000 122.0 117.046 6.000 -999.990 -999.990 1.170 ..P WKT 2010 09 18 08 24 55 31.3200 -97.3300 251.000 457.0 125.609 5.140 -999.990 -999.990 1.256 ..P WKT 2010 09 18 08 34 55 31.3200 -97.3300 251.000 30.0 135.619 4.230 -999.990 -999.990 1.356 ..P WKT 2010 09 18 08 39 55 31.3200 -97.3300 251.000 122.0 126.011 5.750 -999.990 -999.990 1.260 ..P WKT 2010 09 18 08 44 55 31.3200 -97.3300 251.000 457.0 138.932 6.890 -999.990 -999.990 1.389 ..P WKT 2010 09 18 08 49 55 31.3200 -97.3300 251.000 30.0 124.212 6.380 -999.990 -999.990 1.242 ..P WKT 2010 09 18 08 54 55 31.3200 -97.3300 251.000 122.0 124.142 5.640 -999.990 -999.990 1.241 ..P WKT 2010 09 18 08 59 55 31.3200 -97.3300 251.000 457.0 128.217 4.000 -999.990 -999.990 1.282 ..P WKT 2010 09 18 09 09 55 31.3200 -97.3300 251.000 30.0 120.025 5.040 -999.990 -999.990 1.200 ..P WKT 2010 09 18 09 14 55 31.3200 -97.3300 251.000 122.0 117.706 5.370 -999.990 -999.990 1.177 ..P WKT 2010 09 18 09 19 55 31.3200 -97.3300 251.000 457.0 131.960 6.540 -999.990 -999.990 1.320 ..P WKT 2010 09 18 09 24 55 31.3200 -97.3300 251.000 30.0 122.874 4.970 -999.990 -999.990 1.229 ..P WKT 2010 09 18 09 29 55 31.3200 -97.3300 251.000 122.0 118.485 3.880 -999.990 -999.990 1.185 ..P WKT 2010 09 18 09 34 55 31.3200 -97.3300 251.000 457.0 131.353 4.320 -999.990 -999.990 1.314 ..P WKT 2010 09 18 09 44 55 31.3200 -97.3300 251.000 30.0 122.339 3.220 -999.990 -999.990 1.223 ..P WKT 2010 09 18 09 49 55 31.3200 -97.3300 251.000 122.0 117.853 3.720 -999.990 -999.990 1.179 ..P WKT 2010 09 18 09 54 55 31.3200 -97.3300 251.000 457.0 119.578 3.670 -999.990 -999.990 1.196 ..P WKT 2010 09 18 09 59 55 31.3200 -97.3300 251.000 30.0 110.401 3.650 -999.990 -999.990 1.104 ..P WKT 2010 09 18 10 04 55 31.3200 -97.3300 251.000 122.0 117.094 4.170 -999.990 -999.990 1.171 ..P WKT 2010 09 18 10 09 55 31.3200 -97.3300 251.000 457.0 119.783 3.050 -999.990 -999.990 1.198 ..P WKT 2010 09 18 10 19 55 31.3200 -97.3300 251.000 30.0 110.285 4.220 -999.990 -999.990 1.103 ..P WKT 2010 09 18 10 24 55 31.3200 -97.3300 251.000 122.0 115.339 3.530 -999.990 -999.990 1.153 ..P WKT 2010 09 18 10 29 55 31.3200 -97.3300 251.000 457.0 117.083 3.300 -999.990 -999.990 1.171 ..P WKT 2010 09 18 10 34 55 31.3200 -97.3300 251.000 30.0 110.553 3.850 -999.990 -999.990 1.106 ..P WKT 2010 09 18 10 39 55 31.3200 -97.3300 251.000 122.0 107.058 4.070 -999.990 -999.990 1.071 ..P WKT 2010 09 18 10 44 55 31.3200 -97.3300 251.000 457.0 109.353 3.280 -999.990 -999.990 1.094 ..P WKT 2010 09 18 10 54 55 31.3200 -97.3300 251.000 30.0 114.414 4.090 -999.990 -999.990 1.144 ..P WKT 2010 09 18 10 59 55 31.3200 -97.3300 251.000 122.0 110.428 4.360 -999.990 -999.990 1.104 ..P WKT 2010 09 18 11 04 55 31.3200 -97.3300 251.000 457.0 110.852 4.320 -999.990 -999.990 1.109 ..P WKT 2010 09 18 11 09 55 31.3200 -97.3300 251.000 30.0 108.521 3.880 -999.990 -999.990 1.085 ..P WKT 2010 09 18 11 14 55 31.3200 -97.3300 251.000 122.0 111.975 3.880 -999.990 -999.990 1.120 ..P WKT 2010 09 18 11 19 55 31.3200 -97.3300 251.000 457.0 115.154 5.020 -999.990 -999.990 1.152 ..P WKT 2010 09 18 11 29 55 31.3200 -97.3300 251.000 30.0 113.260 4.240 -999.990 -999.990 1.133 ..P WKT 2010 09 18 11 34 55 31.3200 -97.3300 251.000 122.0 110.944 4.070 -999.990 -999.990 1.109 ..P WKT 2010 09 18 11 39 55 31.3200 -97.3300 251.000 457.0 116.614 3.980 -999.990 -999.990 1.166 ..P WKT 2010 09 18 11 44 55 31.3200 -97.3300 251.000 30.0 112.921 4.210 -999.990 -999.990 1.129 ..P WKT 2010 09 18 11 49 55 31.3200 -97.3300 251.000 122.0 110.881 3.580 -999.990 -999.990 1.109 ..P WKT 2010 09 18 12 09 55 31.3200 -97.3300 251.000 457.0 120.444 2.940 -999.990 -999.990 1.204 ..P WKT 2010 09 18 12 10 25 31.3200 -97.3300 251.000 457.0 116.889 3.570 -999.990 -999.990 1.169 ..P WKT 2010 09 18 12 10 55 31.3200 -97.3300 251.000 457.0 114.711 3.120 -999.990 -999.990 1.147 ..P WKT 2010 09 18 12 11 25 31.3200 -97.3300 251.000 457.0 110.881 3.590 -999.990 -999.990 1.109 ..P WKT 2010 09 18 12 11 55 31.3200 -97.3300 251.000 457.0 120.264 3.070 -999.990 -999.990 1.203 ..P WKT 2010 09 18 12 12 25 31.3200 -97.3300 251.000 457.0 115.883 2.970 -999.990 -999.990 1.159 ..P WKT 2010 09 18 12 12 55 31.3200 -97.3300 251.000 457.0 116.458 3.360 -999.990 -999.990 1.165 ..P WKT 2010 09 18 12 13 25 31.3200 -97.3300 251.000 457.0 119.234 3.250 -999.990 -999.990 1.192 ..P WKT 2010 09 18 12 13 55 31.3200 -97.3300 251.000 457.0 115.954 3.010 -999.990 -999.990 1.160 ..P WKT 2010 09 18 12 14 25 31.3200 -97.3300 251.000 457.0 114.878 3.120 -999.990 -999.990 1.149 ..P WKT 2010 09 18 12 14 55 31.3200 -97.3300 251.000 457.0 114.626 2.820 -999.990 -999.990 1.146 ..P WKT 2010 09 18 12 19 55 31.3200 -97.3300 251.000 30.0 110.185 2.990 -999.990 -999.990 1.102 ..P WKT 2010 09 18 12 24 55 31.3200 -97.3300 251.000 122.0 104.642 3.100 -999.990 -999.990 1.046 ..P WKT 2010 09 18 12 29 55 31.3200 -97.3300 251.000 457.0 113.690 2.600 -999.990 -999.990 1.137 ..P WKT 2010 09 18 12 34 55 31.3200 -97.3300 251.000 30.0 114.203 3.610 -999.990 -999.990 1.142 ..P WKT 2010 09 18 12 39 55 31.3200 -97.3300 251.000 122.0 107.422 2.560 -999.990 -999.990 1.074 ..P WKT 2010 09 18 12 44 55 31.3200 -97.3300 251.000 457.0 115.644 2.780 -999.990 -999.990 1.156 ..P WKT 2010 09 18 12 54 55 31.3200 -97.3300 251.000 30.0 116.658 2.820 -999.990 -999.990 1.167 ..P WKT 2010 09 18 12 59 55 31.3200 -97.3300 251.000 122.0 108.349 3.020 -999.990 -999.990 1.083 ..P WKT 2010 09 18 13 04 55 31.3200 -97.3300 251.000 457.0 121.376 2.540 -999.990 -999.990 1.214 ..P WKT 2010 09 18 13 09 55 31.3200 -97.3300 251.000 30.0 118.572 3.960 -999.990 -999.990 1.186 ..P WKT 2010 09 18 13 14 55 31.3200 -97.3300 251.000 122.0 113.980 3.480 -999.990 -999.990 1.140 ..P WKT 2010 09 18 13 19 55 31.3200 -97.3300 251.000 457.0 116.270 3.670 -999.990 -999.990 1.163 ..P WKT 2010 09 18 13 29 55 31.3200 -97.3300 251.000 30.0 116.504 3.110 -999.990 -999.990 1.165 ..P WKT 2010 09 18 13 34 55 31.3200 -97.3300 251.000 122.0 103.160 2.870 -999.990 -999.990 1.032 ..P WKT 2010 09 18 13 39 55 31.3200 -97.3300 251.000 457.0 119.138 2.740 -999.990 -999.990 1.191 ..P WKT 2010 09 18 13 44 55 31.3200 -97.3300 251.000 30.0 129.885 4.900 -999.990 -999.990 1.299 ..P WKT 2010 09 18 13 49 55 31.3200 -97.3300 251.000 122.0 110.759 2.450 -999.990 -999.990 1.108 ..P WKT 2010 09 18 13 54 55 31.3200 -97.3300 251.000 457.0 127.701 3.830 -999.990 -999.990 1.277 ..P WKT 2010 09 18 14 04 55 31.3200 -97.3300 251.000 30.0 133.246 3.050 -999.990 -999.990 1.332 ..P WKT 2010 09 18 14 09 55 31.3200 -97.3300 251.000 122.0 126.391 2.420 -999.990 -999.990 1.264 ..P WKT 2010 09 18 14 14 55 31.3200 -97.3300 251.000 457.0 119.398 2.370 -999.990 -999.990 1.194 ..P WKT 2010 09 18 14 19 55 31.3200 -97.3300 251.000 30.0 132.782 3.390 -999.990 -999.990 1.328 ..P WKT 2010 09 18 14 24 55 31.3200 -97.3300 251.000 122.0 131.572 3.130 -999.990 -999.990 1.316 ..P WKT 2010 09 18 14 29 55 31.3200 -97.3300 251.000 457.0 127.332 4.750 -999.990 -999.990 1.273 ..P WKT 2010 09 18 14 39 55 31.3200 -97.3300 251.000 30.0 137.913 2.720 -999.990 -999.990 1.379 ..P WKT 2010 09 18 14 44 55 31.3200 -97.3300 251.000 122.0 134.145 3.950 -999.990 -999.990 1.341 ..P WKT 2010 09 18 14 49 55 31.3200 -97.3300 251.000 457.0 133.683 4.040 -999.990 -999.990 1.337 ..P WKT 2010 09 18 14 54 55 31.3200 -97.3300 251.000 30.0 139.279 4.240 -999.990 -999.990 1.393 ..P WKT 2010 09 18 14 59 55 31.3200 -97.3300 251.000 122.0 143.497 3.270 -999.990 -999.990 1.435 ..P WKT 2010 09 18 15 04 55 31.3200 -97.3300 251.000 457.0 148.267 2.810 -999.990 -999.990 1.483 ..P WKT 2010 09 18 15 14 55 31.3200 -97.3300 251.000 30.0 142.306 2.930 -999.990 -999.990 1.423 ..P WKT 2010 09 18 15 19 55 31.3200 -97.3300 251.000 122.0 145.620 3.340 -999.990 -999.990 1.456 ..P WKT 2010 09 18 15 24 55 31.3200 -97.3300 251.000 457.0 137.919 4.430 -999.990 -999.990 1.379 ..P WKT 2010 09 18 15 29 55 31.3200 -97.3300 251.000 30.0 133.521 3.510 -999.990 -999.990 1.335 ..P WKT 2010 09 18 15 34 55 31.3200 -97.3300 251.000 122.0 147.301 3.070 -999.990 -999.990 1.473 ..P WKT 2010 09 18 15 39 55 31.3200 -97.3300 251.000 457.0 143.179 3.580 -999.990 -999.990 1.432 ..P WKT 2010 09 18 15 49 55 31.3200 -97.3300 251.000 30.0 137.060 3.270 -999.990 -999.990 1.371 ..P WKT 2010 09 18 15 54 55 31.3200 -97.3300 251.000 122.0 143.050 3.330 -999.990 -999.990 1.431 ..P WKT 2010 09 18 15 59 55 31.3200 -97.3300 251.000 457.0 136.646 3.500 -999.990 -999.990 1.366 ..P WKT 2010 09 18 16 04 55 31.3200 -97.3300 251.000 30.0 136.301 3.130 -999.990 -999.990 1.363 ..P WKT 2010 09 18 16 09 55 31.3200 -97.3300 251.000 122.0 145.872 3.270 -999.990 -999.990 1.459 ..P WKT 2010 09 18 16 14 55 31.3200 -97.3300 251.000 457.0 134.785 4.040 -999.990 -999.990 1.348 ..P WKT 2010 09 18 16 24 55 31.3200 -97.3300 251.000 30.0 132.246 2.660 -999.990 -999.990 1.322 ..P WKT 2010 09 18 16 29 55 31.3200 -97.3300 251.000 122.0 141.070 3.540 -999.990 -999.990 1.411 ..P WKT 2010 09 18 16 34 55 31.3200 -97.3300 251.000 457.0 127.168 3.890 -999.990 -999.990 1.272 ..P WKT 2010 09 18 16 39 55 31.3200 -97.3300 251.000 30.0 130.896 3.150 -999.990 -999.990 1.309 ..P WKT 2010 09 18 16 44 55 31.3200 -97.3300 251.000 122.0 132.007 3.500 -999.990 -999.990 1.320 ..P WKT 2010 09 18 16 49 55 31.3200 -97.3300 251.000 457.0 133.256 3.320 -999.990 -999.990 1.333 ..P WKT 2010 09 18 17 04 55 31.3200 -97.3300 251.000 30.0 124.641 3.050 -999.990 -999.990 1.246 ..P WKT 2010 09 18 17 09 55 31.3200 -97.3300 251.000 122.0 130.728 3.670 -999.990 -999.990 1.307 ..P WKT 2010 09 18 17 14 55 31.3200 -97.3300 251.000 457.0 136.264 3.400 -999.990 -999.990 1.363 ..P WKT 2010 09 18 17 19 55 31.3200 -97.3300 251.000 30.0 124.995 4.120 -999.990 -999.990 1.250 ..P WKT 2010 09 18 17 24 55 31.3200 -97.3300 251.000 122.0 124.195 2.940 -999.990 -999.990 1.242 ..P WKT 2010 09 18 17 29 55 31.3200 -97.3300 251.000 457.0 125.048 3.710 -999.990 -999.990 1.250 ..P WKT 2010 09 18 17 39 55 31.3200 -97.3300 251.000 30.0 121.482 2.590 -999.990 -999.990 1.215 ..P WKT 2010 09 18 17 44 55 31.3200 -97.3300 251.000 122.0 125.466 5.130 -999.990 -999.990 1.255 ..P WKT 2010 09 18 17 49 55 31.3200 -97.3300 251.000 457.0 118.705 3.710 -999.990 -999.990 1.187 ..P WKT 2010 09 18 17 54 55 31.3200 -97.3300 251.000 30.0 117.455 3.780 -999.990 -999.990 1.175 ..P WKT 2010 09 18 17 59 55 31.3200 -97.3300 251.000 122.0 117.445 4.730 -999.990 -999.990 1.174 ..P WKT 2010 09 18 18 04 55 31.3200 -97.3300 251.000 457.0 119.500 4.810 -999.990 -999.990 1.195 ..P WKT 2010 09 18 18 14 55 31.3200 -97.3300 251.000 30.0 115.287 5.540 -999.990 -999.990 1.153 ..P WKT 2010 09 18 18 19 55 31.3200 -97.3300 251.000 122.0 133.403 4.610 -999.990 -999.990 1.334 ..P WKT 2010 09 18 18 24 55 31.3200 -97.3300 251.000 457.0 126.031 4.410 -999.990 -999.990 1.260 ..P WKT 2010 09 18 18 29 55 31.3200 -97.3300 251.000 30.0 125.410 4.350 -999.990 -999.990 1.254 ..P WKT 2010 09 18 18 34 55 31.3200 -97.3300 251.000 122.0 135.398 3.980 -999.990 -999.990 1.354 ..P WKT 2010 09 18 18 39 55 31.3200 -97.3300 251.000 457.0 133.951 5.950 -999.990 -999.990 1.340 ..P WKT 2010 09 18 18 49 55 31.3200 -97.3300 251.000 30.0 124.561 2.570 -999.990 -999.990 1.246 ..P WKT 2010 09 18 18 54 55 31.3200 -97.3300 251.000 122.0 133.979 3.980 -999.990 -999.990 1.340 ..P WKT 2010 09 18 18 59 55 31.3200 -97.3300 251.000 457.0 127.965 3.460 -999.990 -999.990 1.280 ..P WKT 2010 09 18 19 04 55 31.3200 -97.3300 251.000 30.0 130.770 4.280 -999.990 -999.990 1.308 ..P WKT 2010 09 18 19 09 55 31.3200 -97.3300 251.000 122.0 144.321 3.220 -999.990 -999.990 1.443 ..P WKT 2010 09 18 19 14 55 31.3200 -97.3300 251.000 457.0 144.370 2.670 -999.990 -999.990 1.444 ..P WKT 2010 09 18 19 24 55 31.3200 -97.3300 251.000 30.0 132.696 2.480 -999.990 -999.990 1.327 ..P WKT 2010 09 18 19 29 55 31.3200 -97.3300 251.000 122.0 139.713 3.180 -999.990 -999.990 1.397 ..P WKT 2010 09 18 19 34 55 31.3200 -97.3300 251.000 457.0 137.360 4.040 -999.990 -999.990 1.374 ..P WKT 2010 09 18 19 39 55 31.3200 -97.3300 251.000 30.0 135.834 4.750 -999.990 -999.990 1.358 ..P WKT 2010 09 18 19 44 55 31.3200 -97.3300 251.000 122.0 145.607 4.250 -999.990 -999.990 1.456 ..P WKT 2010 09 18 19 49 55 31.3200 -97.3300 251.000 457.0 145.459 2.850 -999.990 -999.990 1.455 ..P WKT 2010 09 18 19 59 55 31.3200 -97.3300 251.000 30.0 134.257 4.150 -999.990 -999.990 1.343 ..P WKT 2010 09 18 20 04 55 31.3200 -97.3300 251.000 122.0 145.251 4.840 -999.990 -999.990 1.453 ..P WKT 2010 09 18 20 09 55 31.3200 -97.3300 251.000 457.0 143.568 6.570 -999.990 -999.990 1.436 ..P WKT 2010 09 18 20 14 55 31.3200 -97.3300 251.000 30.0 138.853 5.010 -999.990 -999.990 1.389 ..P WKT 2010 09 18 20 19 55 31.3200 -97.3300 251.000 122.0 143.508 2.880 -999.990 -999.990 1.435 ..P WKT 2010 09 18 20 24 55 31.3200 -97.3300 251.000 457.0 137.966 2.300 -999.990 -999.990 1.380 ..P WKT 2010 09 18 20 34 55 31.3200 -97.3300 251.000 30.0 137.158 4.310 -999.990 -999.990 1.372 ..P WKT 2010 09 18 20 39 55 31.3200 -97.3300 251.000 122.0 139.273 4.460 -999.990 -999.990 1.393 ..P WKT 2010 09 18 20 44 55 31.3200 -97.3300 251.000 457.0 125.540 3.520 -999.990 -999.990 1.255 ..P WKT 2010 09 18 20 49 55 31.3200 -97.3300 251.000 30.0 119.662 3.170 -999.990 -999.990 1.197 ..P WKT 2010 09 18 20 54 55 31.3200 -97.3300 251.000 122.0 129.910 2.550 -999.990 -999.990 1.299 ..P WKT 2010 09 18 20 59 55 31.3200 -97.3300 251.000 457.0 122.516 2.480 -999.990 -999.990 1.225 ..P WKT 2010 09 18 21 09 55 31.3200 -97.3300 251.000 30.0 128.775 2.780 -999.990 -999.990 1.288 ..P WKT 2010 09 18 21 14 55 31.3200 -97.3300 251.000 122.0 136.779 3.560 -999.990 -999.990 1.368 ..P WKT 2010 09 18 21 19 55 31.3200 -97.3300 251.000 457.0 131.689 4.000 -999.990 -999.990 1.317 ..P WKT 2010 09 18 21 24 55 31.3200 -97.3300 251.000 30.0 140.106 3.260 -999.990 -999.990 1.401 ..P WKT 2010 09 18 21 29 55 31.3200 -97.3300 251.000 122.0 131.707 4.560 -999.990 -999.990 1.317 ..P WKT 2010 09 18 21 34 55 31.3200 -97.3300 251.000 457.0 131.578 3.380 -999.990 -999.990 1.316 ..P WKT 2010 09 18 21 44 55 31.3200 -97.3300 251.000 30.0 121.239 3.430 -999.990 -999.990 1.212 ..P WKT 2010 09 18 21 49 55 31.3200 -97.3300 251.000 122.0 125.364 2.850 -999.990 -999.990 1.254 ..P WKT 2010 09 18 21 54 55 31.3200 -97.3300 251.000 457.0 124.112 2.980 -999.990 -999.990 1.241 ..P WKT 2010 09 18 21 59 55 31.3200 -97.3300 251.000 30.0 111.971 3.560 -999.990 -999.990 1.120 ..P WKT 2010 09 18 22 04 55 31.3200 -97.3300 251.000 122.0 121.197 3.220 -999.990 -999.990 1.212 ..P WKT 2010 09 18 22 09 55 31.3200 -97.3300 251.000 457.0 123.253 3.800 -999.990 -999.990 1.233 ..P WKT 2010 09 18 22 19 55 31.3200 -97.3300 251.000 30.0 123.823 2.410 -999.990 -999.990 1.238 ..P WKT 2010 09 18 22 24 55 31.3200 -97.3300 251.000 122.0 127.160 2.980 -999.990 -999.990 1.272 ..P WKT 2010 09 18 22 29 55 31.3200 -97.3300 251.000 457.0 124.018 3.330 -999.990 -999.990 1.240 ..P WKT 2010 09 18 22 34 55 31.3200 -97.3300 251.000 30.0 124.461 4.170 -999.990 -999.990 1.245 ..P WKT 2010 09 18 22 39 55 31.3200 -97.3300 251.000 122.0 125.455 3.760 -999.990 -999.990 1.255 ..P WKT 2010 09 18 22 44 55 31.3200 -97.3300 251.000 457.0 122.589 4.970 -999.990 -999.990 1.226 ..P WKT 2010 09 18 22 54 55 31.3200 -97.3300 251.000 30.0 124.655 2.400 -999.990 -999.990 1.247 ..P WKT 2010 09 18 22 59 55 31.3200 -97.3300 251.000 122.0 125.177 3.610 -999.990 -999.990 1.252 ..P WKT 2010 09 18 23 04 55 31.3200 -97.3300 251.000 457.0 121.562 4.200 -999.990 -999.990 1.216 ..P WKT 2010 09 18 23 09 55 31.3200 -97.3300 251.000 30.0 122.083 2.910 -999.990 -999.990 1.221 ..P WKT 2010 09 18 23 14 55 31.3200 -97.3300 251.000 122.0 124.534 3.260 -999.990 -999.990 1.245 ..P WKT 2010 09 18 23 19 55 31.3200 -97.3300 251.000 457.0 123.125 3.690 -999.990 -999.990 1.231 ..P WKT 2010 09 18 23 29 55 31.3200 -97.3300 251.000 30.0 117.658 3.010 -999.990 -999.990 1.177 ..P WKT 2010 09 18 23 34 55 31.3200 -97.3300 251.000 122.0 125.181 2.930 -999.990 -999.990 1.252 ..P WKT 2010 09 18 23 39 55 31.3200 -97.3300 251.000 457.0 116.159 2.870 -999.990 -999.990 1.162 ..P WKT 2010 09 18 23 44 55 31.3200 -97.3300 251.000 30.0 114.031 3.310 -999.990 -999.990 1.140 ..P WKT 2010 09 18 23 49 55 31.3200 -97.3300 251.000 122.0 125.416 4.350 -999.990 -999.990 1.254 ..P WKT 2010 09 19 00 09 55 31.3200 -97.3300 251.000 457.0 129.280 2.480 -999.990 -999.990 1.293 ..P WKT 2010 09 19 00 10 25 31.3200 -97.3300 251.000 457.0 127.825 3.110 -999.990 -999.990 1.278 ..P WKT 2010 09 19 00 10 55 31.3200 -97.3300 251.000 457.0 124.991 3.410 -999.990 -999.990 1.250 ..P WKT 2010 09 19 00 11 25 31.3200 -97.3300 251.000 457.0 121.054 2.870 -999.990 -999.990 1.211 ..P WKT 2010 09 19 00 11 55 31.3200 -97.3300 251.000 457.0 125.668 2.320 -999.990 -999.990 1.257 ..P WKT 2010 09 19 00 12 25 31.3200 -97.3300 251.000 457.0 125.316 2.610 -999.990 -999.990 1.253 ..P WKT 2010 09 19 00 12 55 31.3200 -97.3300 251.000 457.0 123.310 2.210 -999.990 -999.990 1.233 ..P WKT 2010 09 19 00 13 25 31.3200 -97.3300 251.000 457.0 123.786 2.960 -999.990 -999.990 1.238 ..P WKT 2010 09 19 00 13 55 31.3200 -97.3300 251.000 457.0 128.124 2.290 -999.990 -999.990 1.281 ..P WKT 2010 09 19 00 14 25 31.3200 -97.3300 251.000 457.0 127.496 2.460 -999.990 -999.990 1.275 ..P WKT 2010 09 19 00 14 55 31.3200 -97.3300 251.000 457.0 119.422 3.040 -999.990 -999.990 1.194 ..P WKT 2010 09 19 00 19 55 31.3200 -97.3300 251.000 30.0 129.976 2.990 -999.990 -999.990 1.300 ..P WKT 2010 09 19 00 24 55 31.3200 -97.3300 251.000 122.0 125.359 2.840 -999.990 -999.990 1.254 ..P WKT 2010 09 19 00 29 55 31.3200 -97.3300 251.000 457.0 123.776 2.940 -999.990 -999.990 1.238 ..P WKT 2010 09 19 00 34 55 31.3200 -97.3300 251.000 30.0 125.641 3.370 -999.990 -999.990 1.256 ..P WKT 2010 09 19 00 39 55 31.3200 -97.3300 251.000 122.0 129.301 5.090 -999.990 -999.990 1.293 ..P WKT 2010 09 19 00 44 55 31.3200 -97.3300 251.000 457.0 123.992 3.500 -999.990 -999.990 1.240 ..P WKT 2010 09 19 00 54 55 31.3200 -97.3300 251.000 30.0 127.213 3.430 -999.990 -999.990 1.272 ..P WKT 2010 09 19 00 59 55 31.3200 -97.3300 251.000 122.0 139.747 3.800 -999.990 -999.990 1.397 ..P WKT 2010 09 19 01 04 55 31.3200 -97.3300 251.000 457.0 132.134 3.270 -999.990 -999.990 1.321 ..P WKT 2010 09 19 01 09 55 31.3200 -97.3300 251.000 30.0 129.764 3.080 -999.990 -999.990 1.298 ..P WKT 2010 09 19 01 14 55 31.3200 -97.3300 251.000 122.0 144.233 4.940 -999.990 -999.990 1.442 ..P WKT 2010 09 19 01 19 55 31.3200 -97.3300 251.000 457.0 138.274 2.630 -999.990 -999.990 1.383 ..P WKT 2010 09 19 01 29 55 31.3200 -97.3300 251.000 30.0 138.662 2.930 -999.990 -999.990 1.387 ..P WKT 2010 09 19 01 34 55 31.3200 -97.3300 251.000 122.0 141.419 2.670 -999.990 -999.990 1.414 ..P WKT 2010 09 19 01 39 55 31.3200 -97.3300 251.000 457.0 134.651 4.680 -999.990 -999.990 1.347 ..P WKT 2010 09 19 01 44 55 31.3200 -97.3300 251.000 30.0 141.827 5.470 -999.990 -999.990 1.418 ..P WKT 2010 09 19 01 49 55 31.3200 -97.3300 251.000 122.0 137.958 4.660 -999.990 -999.990 1.380 ..P WKT 2010 09 19 01 54 55 31.3200 -97.3300 251.000 457.0 128.563 3.140 -999.990 -999.990 1.286 ..P WKT 2010 09 19 02 04 55 31.3200 -97.3300 251.000 30.0 133.922 3.830 -999.990 -999.990 1.339 ..P WKT 2010 09 19 02 09 55 31.3200 -97.3300 251.000 122.0 133.483 4.580 -999.990 -999.990 1.335 ..P WKT 2010 09 19 02 14 55 31.3200 -97.3300 251.000 457.0 130.006 5.130 -999.990 -999.990 1.300 ..P WKT 2010 09 19 02 19 55 31.3200 -97.3300 251.000 30.0 140.205 4.340 -999.990 -999.990 1.402 ..P WKT 2010 09 19 02 24 55 31.3200 -97.3300 251.000 122.0 131.754 3.900 -999.990 -999.990 1.318 ..P WKT 2010 09 19 02 29 55 31.3200 -97.3300 251.000 457.0 127.447 3.640 -999.990 -999.990 1.274 ..P WKT 2010 09 19 02 39 55 31.3200 -97.3300 251.000 30.0 137.921 3.930 -999.990 -999.990 1.379 ..P WKT 2010 09 19 02 44 55 31.3200 -97.3300 251.000 122.0 138.194 3.970 -999.990 -999.990 1.382 ..P WKT 2010 09 19 02 49 55 31.3200 -97.3300 251.000 457.0 127.964 4.270 -999.990 -999.990 1.280 ..P WKT 2010 09 19 02 54 55 31.3200 -97.3300 251.000 30.0 131.553 3.900 -999.990 -999.990 1.316 ..P WKT 2010 09 19 02 59 55 31.3200 -97.3300 251.000 122.0 132.378 3.940 -999.990 -999.990 1.324 ..P WKT 2010 09 19 03 04 55 31.3200 -97.3300 251.000 457.0 133.756 4.300 -999.990 -999.990 1.338 ..P WKT 2010 09 19 03 14 55 31.3200 -97.3300 251.000 30.0 142.636 3.690 -999.990 -999.990 1.426 ..P WKT 2010 09 19 03 19 55 31.3200 -97.3300 251.000 122.0 135.206 3.600 -999.990 -999.990 1.352 ..P WKT 2010 09 19 03 24 55 31.3200 -97.3300 251.000 457.0 127.223 4.580 -999.990 -999.990 1.272 ..P WKT 2010 09 19 03 29 55 31.3200 -97.3300 251.000 30.0 134.724 5.350 -999.990 -999.990 1.347 ..P WKT 2010 09 19 03 34 55 31.3200 -97.3300 251.000 122.0 131.995 3.730 -999.990 -999.990 1.320 ..P WKT 2010 09 19 03 39 55 31.3200 -97.3300 251.000 457.0 128.711 3.380 -999.990 -999.990 1.287 ..P WKT 2010 09 19 03 49 55 31.3200 -97.3300 251.000 30.0 144.351 2.850 -999.990 -999.990 1.444 ..P WKT 2010 09 19 03 54 55 31.3200 -97.3300 251.000 122.0 133.678 4.370 -999.990 -999.990 1.337 ..P WKT 2010 09 19 03 59 55 31.3200 -97.3300 251.000 457.0 125.770 4.980 -999.990 -999.990 1.258 ..P WKT 2010 09 19 04 04 55 31.3200 -97.3300 251.000 30.0 139.164 3.530 -999.990 -999.990 1.392 ..P WKT 2010 09 19 04 09 55 31.3200 -97.3300 251.000 122.0 139.280 2.430 -999.990 -999.990 1.393 ..P WKT 2010 09 19 04 14 55 31.3200 -97.3300 251.000 457.0 128.880 4.780 -999.990 -999.990 1.289 ..P WKT 2010 09 19 04 24 55 31.3200 -97.3300 251.000 30.0 133.774 2.900 -999.990 -999.990 1.338 ..P WKT 2010 09 19 04 29 55 31.3200 -97.3300 251.000 122.0 129.836 3.430 -999.990 -999.990 1.298 ..P WKT 2010 09 19 04 34 55 31.3200 -97.3300 251.000 457.0 129.772 4.470 -999.990 -999.990 1.298 ..P WKT 2010 09 19 04 39 55 31.3200 -97.3300 251.000 30.0 132.062 3.970 -999.990 -999.990 1.321 ..P WKT 2010 09 19 04 44 55 31.3200 -97.3300 251.000 122.0 130.061 4.260 -999.990 -999.990 1.301 ..P WKT 2010 09 19 04 49 55 31.3200 -97.3300 251.000 457.0 130.275 4.290 -999.990 -999.990 1.303 ..P WKT 2010 09 19 05 04 55 31.3200 -97.3300 251.000 30.0 138.855 4.690 -999.990 -999.990 1.389 ..P WKT 2010 09 19 05 09 55 31.3200 -97.3300 251.000 122.0 149.685 4.660 -999.990 -999.990 1.497 ..P WKT 2010 09 19 05 14 55 31.3200 -97.3300 251.000 457.0 139.056 4.830 -999.990 -999.990 1.391 ..P WKT 2010 09 19 05 19 55 31.3200 -97.3300 251.000 30.0 139.640 4.620 -999.990 -999.990 1.396 ..P WKT 2010 09 19 05 24 55 31.3200 -97.3300 251.000 122.0 144.242 4.660 -999.990 -999.990 1.442 ..P WKT 2010 09 19 05 29 55 31.3200 -97.3300 251.000 457.0 136.795 4.770 -999.990 -999.990 1.368 ..P WKT 2010 09 19 05 39 55 31.3200 -97.3300 251.000 30.0 147.230 5.690 -999.990 -999.990 1.472 ..P WKT 2010 09 19 05 44 55 31.3200 -97.3300 251.000 122.0 149.324 4.930 -999.990 -999.990 1.493 ..P WKT 2010 09 19 05 49 55 31.3200 -97.3300 251.000 457.0 141.584 5.590 -999.990 -999.990 1.416 ..P WKT 2010 09 19 05 54 55 31.3200 -97.3300 251.000 30.0 144.232 4.700 -999.990 -999.990 1.442 ..P WKT 2010 09 19 05 59 55 31.3200 -97.3300 251.000 122.0 117.649 6.400 -999.990 -999.990 1.176 ..P WKT 2010 09 19 06 04 55 31.3200 -97.3300 251.000 457.0 145.235 5.000 -999.990 -999.990 1.452 ..P WKT 2010 09 19 06 14 55 31.3200 -97.3300 251.000 30.0 158.610 4.860 -999.990 -999.990 1.586 ..P WKT 2010 09 19 06 19 55 31.3200 -97.3300 251.000 122.0 138.990 4.300 -999.990 -999.990 1.390 ..P WKT 2010 09 19 06 24 55 31.3200 -97.3300 251.000 457.0 132.810 4.020 -999.990 -999.990 1.328 ..P WKT 2010 09 19 06 29 55 31.3200 -97.3300 251.000 30.0 156.980 5.420 -999.990 -999.990 1.570 ..P WKT 2010 09 19 06 34 55 31.3200 -97.3300 251.000 122.0 121.001 4.090 -999.990 -999.990 1.210 ..P WKT 2010 09 19 06 39 55 31.3200 -97.3300 251.000 457.0 140.184 3.290 -999.990 -999.990 1.402 ..P WKT 2010 09 19 06 49 55 31.3200 -97.3300 251.000 30.0 157.268 3.590 -999.990 -999.990 1.573 ..P WKT 2010 09 19 06 54 55 31.3200 -97.3300 251.000 122.0 123.557 3.460 -999.990 -999.990 1.236 ..P WKT 2010 09 19 06 59 55 31.3200 -97.3300 251.000 457.0 146.687 2.790 -999.990 -999.990 1.467 ..P WKT 2010 09 19 07 04 55 31.3200 -97.3300 251.000 30.0 146.802 2.870 -999.990 -999.990 1.468 ..P WKT 2010 09 19 07 09 55 31.3200 -97.3300 251.000 122.0 113.916 3.000 -999.990 -999.990 1.139 ..P WKT 2010 09 19 07 14 55 31.3200 -97.3300 251.000 457.0 132.058 3.030 -999.990 -999.990 1.321 ..P WKT 2010 09 19 07 24 55 31.3200 -97.3300 251.000 30.0 136.963 3.320 -999.990 -999.990 1.370 ..P WKT 2010 09 19 07 29 55 31.3200 -97.3300 251.000 122.0 112.350 2.970 -999.990 -999.990 1.123 ..P WKT 2010 09 19 07 34 55 31.3200 -97.3300 251.000 457.0 121.024 3.530 -999.990 -999.990 1.210 ..P WKT 2010 09 19 07 39 55 31.3200 -97.3300 251.000 30.0 136.357 2.700 -999.990 -999.990 1.364 ..P WKT 2010 09 19 07 44 55 31.3200 -97.3300 251.000 122.0 109.520 2.480 -999.990 -999.990 1.095 ..P WKT 2010 09 19 07 49 55 31.3200 -97.3300 251.000 457.0 121.802 3.400 -999.990 -999.990 1.218 ..P WKT 2010 09 19 07 59 55 31.3200 -97.3300 251.000 30.0 132.478 2.720 -999.990 -999.990 1.325 ..P WKT 2010 09 19 08 04 55 31.3200 -97.3300 251.000 122.0 113.384 3.970 -999.990 -999.990 1.134 ..P WKT 2010 09 19 08 09 55 31.3200 -97.3300 251.000 457.0 116.768 3.320 -999.990 -999.990 1.168 ..P WKT 2010 09 19 08 14 55 31.3200 -97.3300 251.000 30.0 135.697 3.690 -999.990 -999.990 1.357 ..P WKT 2010 09 19 08 19 55 31.3200 -97.3300 251.000 122.0 117.294 3.660 -999.990 -999.990 1.173 ..P WKT 2010 09 19 08 24 55 31.3200 -97.3300 251.000 457.0 116.099 4.010 -999.990 -999.990 1.161 ..P WKT 2010 09 19 08 34 55 31.3200 -97.3300 251.000 30.0 140.045 3.760 -999.990 -999.990 1.400 ..P WKT 2010 09 19 08 39 55 31.3200 -97.3300 251.000 122.0 115.767 3.600 -999.990 -999.990 1.158 ..P WKT 2010 09 19 08 44 55 31.3200 -97.3300 251.000 457.0 110.229 3.670 -999.990 -999.990 1.102 ..P WKT 2010 09 19 08 49 55 31.3200 -97.3300 251.000 30.0 141.344 4.580 -999.990 -999.990 1.413 ..P WKT 2010 09 19 08 54 55 31.3200 -97.3300 251.000 122.0 120.255 3.780 -999.990 -999.990 1.203 ..P WKT 2010 09 19 08 59 55 31.3200 -97.3300 251.000 457.0 117.077 3.510 -999.990 -999.990 1.171 ..P WKT 2010 09 19 09 09 55 31.3200 -97.3300 251.000 30.0 138.612 3.450 -999.990 -999.990 1.386 ..P WKT 2010 09 19 09 14 55 31.3200 -97.3300 251.000 122.0 103.054 3.940 -999.990 -999.990 1.031 ..P WKT 2010 09 19 09 19 55 31.3200 -97.3300 251.000 457.0 113.049 3.850 -999.990 -999.990 1.130 ..P WKT 2010 09 19 09 24 55 31.3200 -97.3300 251.000 30.0 126.240 3.650 -999.990 -999.990 1.262 ..P WKT 2010 09 19 09 29 55 31.3200 -97.3300 251.000 122.0 98.175 4.560 -999.990 -999.990 0.982 ..P WKT 2010 09 19 09 34 55 31.3200 -97.3300 251.000 457.0 106.365 4.460 -999.990 -999.990 1.064 ..P WKT 2010 09 19 09 44 55 31.3200 -97.3300 251.000 30.0 120.407 3.660 -999.990 -999.990 1.204 ..P WKT 2010 09 19 09 49 55 31.3200 -97.3300 251.000 122.0 102.636 3.770 -999.990 -999.990 1.026 ..P WKT 2010 09 19 09 54 55 31.3200 -97.3300 251.000 457.0 107.931 3.660 -999.990 -999.990 1.079 ..P WKT 2010 09 19 09 59 55 31.3200 -97.3300 251.000 30.0 106.138 4.390 -999.990 -999.990 1.061 ..P WKT 2010 09 19 10 04 55 31.3200 -97.3300 251.000 122.0 133.947 4.140 -999.990 -999.990 1.339 ..P WKT 2010 09 19 10 09 55 31.3200 -97.3300 251.000 457.0 105.750 4.290 -999.990 -999.990 1.058 ..P WKT 2010 09 19 10 19 55 31.3200 -97.3300 251.000 30.0 139.734 4.110 -999.990 -999.990 1.397 ..P WKT 2010 09 19 10 24 55 31.3200 -97.3300 251.000 122.0 99.338 3.880 -999.990 -999.990 0.993 ..P WKT 2010 09 19 10 29 55 31.3200 -97.3300 251.000 457.0 104.535 3.570 -999.990 -999.990 1.045 ..P WKT 2010 09 19 10 34 55 31.3200 -97.3300 251.000 30.0 126.695 5.480 -999.990 -999.990 1.267 ..P WKT 2010 09 19 10 39 55 31.3200 -97.3300 251.000 122.0 133.007 3.790 -999.990 -999.990 1.330 ..P WKT 2010 09 19 10 44 55 31.3200 -97.3300 251.000 457.0 106.783 4.200 -999.990 -999.990 1.068 ..P WKT 2010 09 19 10 54 55 31.3200 -97.3300 251.000 30.0 157.272 3.830 -999.990 -999.990 1.573 ..P WKT 2010 09 19 10 59 55 31.3200 -97.3300 251.000 122.0 127.468 3.660 -999.990 -999.990 1.275 ..P WKT 2010 09 19 11 04 55 31.3200 -97.3300 251.000 457.0 105.450 3.650 -999.990 -999.990 1.054 ..P WKT 2010 09 19 11 09 55 31.3200 -97.3300 251.000 30.0 155.754 3.780 -999.990 -999.990 1.558 ..P WKT 2010 09 19 11 14 55 31.3200 -97.3300 251.000 122.0 109.253 3.640 -999.990 -999.990 1.093 ..P WKT 2010 09 19 11 19 55 31.3200 -97.3300 251.000 457.0 112.547 3.630 -999.990 -999.990 1.125 ..P WKT 2010 09 19 11 29 55 31.3200 -97.3300 251.000 30.0 153.260 4.010 -999.990 -999.990 1.533 ..P WKT 2010 09 19 11 34 55 31.3200 -97.3300 251.000 122.0 106.926 3.890 -999.990 -999.990 1.069 ..P WKT 2010 09 19 11 39 55 31.3200 -97.3300 251.000 457.0 104.555 3.790 -999.990 -999.990 1.046 ..P WKT 2010 09 19 11 44 55 31.3200 -97.3300 251.000 30.0 149.495 4.520 -999.990 -999.990 1.495 ..P WKT 2010 09 19 11 49 55 31.3200 -97.3300 251.000 122.0 142.952 4.330 -999.990 -999.990 1.430 ..P WKT 2010 09 19 12 09 55 31.3200 -97.3300 251.000 457.0 108.099 3.320 -999.990 -999.990 1.081 ..P WKT 2010 09 19 12 10 25 31.3200 -97.3300 251.000 457.0 111.170 4.370 -999.990 -999.990 1.112 ..P WKT 2010 09 19 12 10 55 31.3200 -97.3300 251.000 457.0 117.301 3.550 -999.990 -999.990 1.173 ..P WKT 2010 09 19 12 11 25 31.3200 -97.3300 251.000 457.0 112.578 5.110 -999.990 -999.990 1.126 ..P WKT 2010 09 19 12 11 55 31.3200 -97.3300 251.000 457.0 106.742 3.850 -999.990 -999.990 1.067 ..P WKT 2010 09 19 12 12 25 31.3200 -97.3300 251.000 457.0 114.544 3.140 -999.990 -999.990 1.145 ..P WKT 2010 09 19 12 12 55 31.3200 -97.3300 251.000 457.0 107.038 3.030 -999.990 -999.990 1.070 ..P WKT 2010 09 19 12 13 25 31.3200 -97.3300 251.000 457.0 113.448 3.050 -999.990 -999.990 1.134 ..P WKT 2010 09 19 12 13 55 31.3200 -97.3300 251.000 457.0 109.004 3.230 -999.990 -999.990 1.090 ..P WKT 2010 09 19 12 14 25 31.3200 -97.3300 251.000 457.0 104.977 4.420 -999.990 -999.990 1.050 ..P WKT 2010 09 19 12 14 55 31.3200 -97.3300 251.000 457.0 104.986 4.230 -999.990 -999.990 1.050 ..P WKT 2010 09 19 12 19 55 31.3200 -97.3300 251.000 30.0 144.313 4.380 -999.990 -999.990 1.443 ..P WKT 2010 09 19 12 24 55 31.3200 -97.3300 251.000 122.0 119.909 3.450 -999.990 -999.990 1.199 ..P WKT 2010 09 19 12 29 55 31.3200 -97.3300 251.000 457.0 109.421 3.770 -999.990 -999.990 1.094 ..P WKT 2010 09 19 12 34 55 31.3200 -97.3300 251.000 30.0 141.090 3.460 -999.990 -999.990 1.411 ..P WKT 2010 09 19 12 39 55 31.3200 -97.3300 251.000 122.0 114.603 3.840 -999.990 -999.990 1.146 ..P WKT 2010 09 19 12 44 55 31.3200 -97.3300 251.000 457.0 109.542 3.000 -999.990 -999.990 1.095 ..P WKT 2010 09 19 12 54 55 31.3200 -97.3300 251.000 30.0 139.053 3.690 -999.990 -999.990 1.391 ..P WKT 2010 09 19 12 59 55 31.3200 -97.3300 251.000 122.0 119.930 3.390 -999.990 -999.990 1.199 ..P WKT 2010 09 19 13 04 55 31.3200 -97.3300 251.000 457.0 113.327 3.950 -999.990 -999.990 1.133 ..P WKT 2010 09 19 13 09 55 31.3200 -97.3300 251.000 30.0 137.461 5.340 -999.990 -999.990 1.375 ..P WKT 2010 09 19 13 14 55 31.3200 -97.3300 251.000 122.0 123.069 4.070 -999.990 -999.990 1.231 ..P WKT 2010 09 19 13 19 55 31.3200 -97.3300 251.000 457.0 109.375 3.300 -999.990 -999.990 1.094 ..P WKT 2010 09 19 13 29 55 31.3200 -97.3300 251.000 30.0 132.922 3.440 -999.990 -999.990 1.329 ..P WKT 2010 09 19 13 34 55 31.3200 -97.3300 251.000 122.0 118.435 4.550 -999.990 -999.990 1.184 ..P WKT 2010 09 19 13 39 55 31.3200 -97.3300 251.000 457.0 110.762 4.130 -999.990 -999.990 1.108 ..P WKT 2010 09 19 13 44 55 31.3200 -97.3300 251.000 30.0 135.622 4.070 -999.990 -999.990 1.356 ..P WKT 2010 09 19 13 49 55 31.3200 -97.3300 251.000 122.0 119.468 4.020 -999.990 -999.990 1.195 ..P WKT 2010 09 19 13 54 55 31.3200 -97.3300 251.000 457.0 115.550 4.050 -999.990 -999.990 1.155 ..P WKT 2010 09 19 14 04 55 31.3200 -97.3300 251.000 30.0 145.919 6.260 -999.990 -999.990 1.459 ..P WKT 2010 09 19 14 09 55 31.3200 -97.3300 251.000 122.0 125.996 5.850 -999.990 -999.990 1.260 ..P WKT 2010 09 19 14 14 55 31.3200 -97.3300 251.000 457.0 123.587 4.220 -999.990 -999.990 1.236 ..P WKT 2010 09 19 14 19 55 31.3200 -97.3300 251.000 30.0 139.523 5.020 -999.990 -999.990 1.395 ..P WKT 2010 09 19 14 24 55 31.3200 -97.3300 251.000 122.0 141.839 4.570 -999.990 -999.990 1.418 ..P WKT 2010 09 19 14 29 55 31.3200 -97.3300 251.000 457.0 129.423 3.840 -999.990 -999.990 1.294 ..P WKT 2010 09 19 14 39 55 31.3200 -97.3300 251.000 30.0 148.963 4.260 -999.990 -999.990 1.490 ..P WKT 2010 09 19 14 44 55 31.3200 -97.3300 251.000 122.0 148.677 4.840 -999.990 -999.990 1.487 ..P WKT 2010 09 19 14 49 55 31.3200 -97.3300 251.000 457.0 130.606 5.440 -999.990 -999.990 1.306 ..P WKT 2010 09 19 14 54 55 31.3200 -97.3300 251.000 30.0 141.437 4.380 -999.990 -999.990 1.414 ..P WKT 2010 09 19 14 59 55 31.3200 -97.3300 251.000 122.0 148.098 4.690 -999.990 -999.990 1.481 ..P WKT 2010 09 19 15 04 55 31.3200 -97.3300 251.000 457.0 121.416 3.720 -999.990 -999.990 1.214 ..P WKT 2010 09 19 15 14 55 31.3200 -97.3300 251.000 30.0 142.121 4.040 -999.990 -999.990 1.421 ..P WKT 2010 09 19 15 19 55 31.3200 -97.3300 251.000 122.0 144.217 4.280 -999.990 -999.990 1.442 ..P WKT 2010 09 19 15 24 55 31.3200 -97.3300 251.000 457.0 117.700 3.570 -999.990 -999.990 1.177 ..P WKT 2010 09 19 15 29 55 31.3200 -97.3300 251.000 30.0 140.908 3.710 -999.990 -999.990 1.409 ..P WKT 2010 09 19 15 34 55 31.3200 -97.3300 251.000 122.0 137.726 3.550 -999.990 -999.990 1.377 ..P WKT 2010 09 19 15 39 55 31.3200 -97.3300 251.000 457.0 132.600 4.450 -999.990 -999.990 1.326 ..P WKT 2010 09 19 15 49 55 31.3200 -97.3300 251.000 30.0 135.086 3.380 -999.990 -999.990 1.351 ..P WKT 2010 09 19 15 54 55 31.3200 -97.3300 251.000 122.0 140.474 4.820 -999.990 -999.990 1.405 ..P WKT 2010 09 19 15 59 55 31.3200 -97.3300 251.000 457.0 132.255 3.580 -999.990 -999.990 1.323 ..P WKT 2010 09 19 16 04 55 31.3200 -97.3300 251.000 30.0 144.030 3.610 -999.990 -999.990 1.440 ..P WKT 2010 09 19 16 09 55 31.3200 -97.3300 251.000 122.0 145.529 4.150 -999.990 -999.990 1.455 ..P WKT 2010 09 19 16 14 55 31.3200 -97.3300 251.000 457.0 135.784 3.440 -999.990 -999.990 1.358 ..P WKT 2010 09 19 16 24 55 31.3200 -97.3300 251.000 30.0 135.254 3.480 -999.990 -999.990 1.353 ..P WKT 2010 09 19 16 29 55 31.3200 -97.3300 251.000 122.0 140.858 3.670 -999.990 -999.990 1.409 ..P WKT 2010 09 19 16 34 55 31.3200 -97.3300 251.000 457.0 126.891 4.070 -999.990 -999.990 1.269 ..P WKT 2010 09 19 16 39 55 31.3200 -97.3300 251.000 30.0 127.222 4.150 -999.990 -999.990 1.272 ..P WKT 2010 09 19 16 44 55 31.3200 -97.3300 251.000 122.0 137.683 4.020 -999.990 -999.990 1.377 ..P WKT 2010 09 19 16 49 55 31.3200 -97.3300 251.000 457.0 130.103 3.480 -999.990 -999.990 1.301 ..P WKT 2010 09 19 17 04 55 31.3200 -97.3300 251.000 30.0 128.407 4.690 -999.990 -999.990 1.284 ..P WKT 2010 09 19 17 09 55 31.3200 -97.3300 251.000 122.0 135.789 3.680 -999.990 -999.990 1.358 ..P WKT 2010 09 19 17 14 55 31.3200 -97.3300 251.000 457.0 137.620 3.730 -999.990 -999.990 1.376 ..P WKT 2010 09 19 17 19 55 31.3200 -97.3300 251.000 30.0 139.728 3.940 -999.990 -999.990 1.397 ..P WKT 2010 09 19 17 24 55 31.3200 -97.3300 251.000 122.0 134.068 4.870 -999.990 -999.990 1.341 ..P WKT 2010 09 19 17 29 55 31.3200 -97.3300 251.000 457.0 141.032 3.720 -999.990 -999.990 1.410 ..P WKT 2010 09 19 17 39 55 31.3200 -97.3300 251.000 30.0 137.227 4.110 -999.990 -999.990 1.372 ..P WKT 2010 09 19 17 44 55 31.3200 -97.3300 251.000 122.0 143.105 4.320 -999.990 -999.990 1.431 ..P WKT 2010 09 19 17 49 55 31.3200 -97.3300 251.000 457.0 132.061 5.270 -999.990 -999.990 1.321 ..P WKT 2010 09 19 17 54 55 31.3200 -97.3300 251.000 30.0 140.019 6.880 -999.990 -999.990 1.400 ..P WKT 2010 09 19 17 59 55 31.3200 -97.3300 251.000 122.0 138.129 5.650 -999.990 -999.990 1.381 ..P WKT 2010 09 19 18 04 55 31.3200 -97.3300 251.000 457.0 137.488 4.250 -999.990 -999.990 1.375 ..P WKT 2010 09 19 18 14 55 31.3200 -97.3300 251.000 30.0 139.474 4.220 -999.990 -999.990 1.395 ..P WKT 2010 09 19 18 19 55 31.3200 -97.3300 251.000 122.0 145.707 5.290 -999.990 -999.990 1.457 ..P WKT 2010 09 19 18 24 55 31.3200 -97.3300 251.000 457.0 141.400 6.480 -999.990 -999.990 1.414 ..P WKT 2010 09 19 18 29 55 31.3200 -97.3300 251.000 30.0 145.968 7.620 -999.990 -999.990 1.460 ..P WKT 2010 09 19 18 34 55 31.3200 -97.3300 251.000 122.0 148.872 6.650 -999.990 -999.990 1.489 ..P WKT 2010 09 19 18 39 55 31.3200 -97.3300 251.000 457.0 146.508 4.810 -999.990 -999.990 1.465 ..P WKT 2010 09 19 18 49 55 31.3200 -97.3300 251.000 30.0 145.007 5.930 -999.990 -999.990 1.450 ..P WKT 2010 09 19 18 54 55 31.3200 -97.3300 251.000 122.0 153.632 6.670 -999.990 -999.990 1.536 ..P WKT 2010 09 19 18 59 55 31.3200 -97.3300 251.000 457.0 151.170 8.030 -999.990 -999.990 1.512 ..P WKT 2010 09 19 19 04 55 31.3200 -97.3300 251.000 30.0 144.271 6.310 -999.990 -999.990 1.443 ..P WKT 2010 09 19 19 09 55 31.3200 -97.3300 251.000 122.0 152.064 5.020 -999.990 -999.990 1.521 ..P WKT 2010 09 19 19 14 55 31.3200 -97.3300 251.000 457.0 148.492 4.190 -999.990 -999.990 1.485 ..P WKT 2010 09 19 19 24 55 31.3200 -97.3300 251.000 30.0 144.558 4.330 -999.990 -999.990 1.446 ..P WKT 2010 09 19 19 29 55 31.3200 -97.3300 251.000 122.0 146.134 5.800 -999.990 -999.990 1.461 ..P WKT 2010 09 19 19 34 55 31.3200 -97.3300 251.000 457.0 149.927 6.170 -999.990 -999.990 1.499 ..P WKT 2010 09 19 19 39 55 31.3200 -97.3300 251.000 30.0 140.418 4.800 -999.990 -999.990 1.404 ..P WKT 2010 09 19 19 44 55 31.3200 -97.3300 251.000 122.0 142.271 5.220 -999.990 -999.990 1.423 ..P WKT 2010 09 19 19 49 55 31.3200 -97.3300 251.000 457.0 145.232 4.900 -999.990 -999.990 1.452 ..P WKT 2010 09 19 19 59 55 31.3200 -97.3300 251.000 30.0 140.230 4.840 -999.990 -999.990 1.402 ..P WKT 2010 09 19 20 04 55 31.3200 -97.3300 251.000 122.0 151.107 4.950 -999.990 -999.990 1.511 ..P WKT 2010 09 19 20 09 55 31.3200 -97.3300 251.000 457.0 142.036 4.500 -999.990 -999.990 1.420 ..P WKT 2010 09 19 20 14 55 31.3200 -97.3300 251.000 30.0 142.384 4.440 -999.990 -999.990 1.424 ..P WKT 2010 09 19 20 19 55 31.3200 -97.3300 251.000 122.0 148.965 4.110 -999.990 -999.990 1.490 ..P WKT 2010 09 19 20 24 55 31.3200 -97.3300 251.000 457.0 141.420 4.470 -999.990 -999.990 1.414 ..P WKT 2010 09 19 20 34 55 31.3200 -97.3300 251.000 30.0 138.913 4.280 -999.990 -999.990 1.389 ..P WKT 2010 09 19 20 39 55 31.3200 -97.3300 251.000 122.0 142.703 3.660 -999.990 -999.990 1.427 ..P WKT 2010 09 19 20 44 55 31.3200 -97.3300 251.000 457.0 137.078 3.750 -999.990 -999.990 1.371 ..P WKT 2010 09 19 20 49 55 31.3200 -97.3300 251.000 30.0 145.991 4.280 -999.990 -999.990 1.460 ..P WKT 2010 09 19 20 54 55 31.3200 -97.3300 251.000 122.0 142.166 4.070 -999.990 -999.990 1.422 ..P WKT 2010 09 19 20 59 55 31.3200 -97.3300 251.000 457.0 142.910 4.430 -999.990 -999.990 1.429 ..P WKT 2010 09 19 21 09 55 31.3200 -97.3300 251.000 30.0 142.203 5.490 -999.990 -999.990 1.422 ..P WKT 2010 09 19 21 14 55 31.3200 -97.3300 251.000 122.0 154.318 5.160 -999.990 -999.990 1.543 ..P WKT 2010 09 19 21 19 55 31.3200 -97.3300 251.000 457.0 150.097 4.070 -999.990 -999.990 1.501 ..P WKT 2010 09 19 21 24 55 31.3200 -97.3300 251.000 30.0 150.722 5.190 -999.990 -999.990 1.507 ..P WKT 2010 09 19 21 29 55 31.3200 -97.3300 251.000 122.0 154.946 4.270 -999.990 -999.990 1.549 ..P WKT 2010 09 19 21 34 55 31.3200 -97.3300 251.000 457.0 153.079 4.090 -999.990 -999.990 1.531 ..P WKT 2010 09 19 21 44 55 31.3200 -97.3300 251.000 30.0 144.760 3.830 -999.990 -999.990 1.448 ..P WKT 2010 09 19 21 49 55 31.3200 -97.3300 251.000 122.0 150.624 4.570 -999.990 -999.990 1.506 ..P WKT 2010 09 19 21 54 55 31.3200 -97.3300 251.000 457.0 147.493 4.720 -999.990 -999.990 1.475 ..P WKT 2010 09 19 21 59 55 31.3200 -97.3300 251.000 30.0 144.639 4.530 -999.990 -999.990 1.446 ..P WKT 2010 09 19 22 04 55 31.3200 -97.3300 251.000 122.0 153.545 4.970 -999.990 -999.990 1.535 ..P WKT 2010 09 19 22 09 55 31.3200 -97.3300 251.000 457.0 148.063 3.490 -999.990 -999.990 1.481 ..P WKT 2010 09 19 22 19 55 31.3200 -97.3300 251.000 30.0 151.446 4.050 -999.990 -999.990 1.514 ..P WKT 2010 09 19 22 24 55 31.3200 -97.3300 251.000 122.0 152.980 4.270 -999.990 -999.990 1.530 ..P WKT 2010 09 19 22 29 55 31.3200 -97.3300 251.000 457.0 151.193 4.580 -999.990 -999.990 1.512 ..P WKT 2010 09 19 22 34 55 31.3200 -97.3300 251.000 30.0 152.726 4.450 -999.990 -999.990 1.527 ..P WKT 2010 09 19 22 39 55 31.3200 -97.3300 251.000 122.0 152.600 5.200 -999.990 -999.990 1.526 ..P WKT 2010 09 19 22 44 55 31.3200 -97.3300 251.000 457.0 150.537 3.730 -999.990 -999.990 1.505 ..P WKT 2010 09 19 22 54 55 31.3200 -97.3300 251.000 30.0 143.686 3.920 -999.990 -999.990 1.437 ..P WKT 2010 09 19 22 59 55 31.3200 -97.3300 251.000 122.0 156.598 4.640 -999.990 -999.990 1.566 ..P WKT 2010 09 19 23 04 55 31.3200 -97.3300 251.000 457.0 149.597 3.700 -999.990 -999.990 1.496 ..P WKT 2010 09 19 23 09 55 31.3200 -97.3300 251.000 30.0 155.318 3.780 -999.990 -999.990 1.553 ..P WKT 2010 09 19 23 14 55 31.3200 -97.3300 251.000 122.0 157.166 3.880 -999.990 -999.990 1.572 ..P WKT 2010 09 19 23 19 55 31.3200 -97.3300 251.000 457.0 154.037 4.800 -999.990 -999.990 1.540 ..P WKT 2010 09 19 23 29 55 31.3200 -97.3300 251.000 30.0 152.110 4.040 -999.990 -999.990 1.521 ..P WKT 2010 09 19 23 34 55 31.3200 -97.3300 251.000 122.0 149.165 3.710 -999.990 -999.990 1.492 ..P WKT 2010 09 19 23 39 55 31.3200 -97.3300 251.000 457.0 150.367 3.580 -999.990 -999.990 1.504 ..P WKT 2010 09 19 23 44 55 31.3200 -97.3300 251.000 30.0 134.982 4.490 -999.990 -999.990 1.350 ..P WKT 2010 09 19 23 49 55 31.3200 -97.3300 251.000 122.0 137.842 3.990 -999.990 -999.990 1.378 ..P WKT 2010 09 20 00 09 55 31.3200 -97.3300 251.000 457.0 147.425 4.100 -999.990 -999.990 1.474 ..P WKT 2010 09 20 00 10 25 31.3200 -97.3300 251.000 457.0 144.827 4.030 -999.990 -999.990 1.448 ..P WKT 2010 09 20 00 10 55 31.3200 -97.3300 251.000 457.0 144.717 3.480 -999.990 -999.990 1.447 ..P WKT 2010 09 20 00 11 25 31.3200 -97.3300 251.000 457.0 140.599 4.680 -999.990 -999.990 1.406 ..P WKT 2010 09 20 00 11 55 31.3200 -97.3300 251.000 457.0 138.968 3.970 -999.990 -999.990 1.390 ..P WKT 2010 09 20 00 12 25 31.3200 -97.3300 251.000 457.0 141.897 3.520 -999.990 -999.990 1.419 ..P WKT 2010 09 20 00 12 55 31.3200 -97.3300 251.000 457.0 142.063 3.490 -999.990 -999.990 1.421 ..P WKT 2010 09 20 00 13 25 31.3200 -97.3300 251.000 457.0 138.912 3.710 -999.990 -999.990 1.389 ..P WKT 2010 09 20 00 13 55 31.3200 -97.3300 251.000 457.0 135.899 3.490 -999.990 -999.990 1.359 ..P WKT 2010 09 20 00 14 25 31.3200 -97.3300 251.000 457.0 137.862 4.120 -999.990 -999.990 1.379 ..P WKT 2010 09 20 00 14 55 31.3200 -97.3300 251.000 457.0 139.133 3.670 -999.990 -999.990 1.391 ..P WKT 2010 09 20 00 19 55 31.3200 -97.3300 251.000 30.0 137.473 4.600 -999.990 -999.990 1.375 ..P WKT 2010 09 20 00 24 55 31.3200 -97.3300 251.000 122.0 138.301 4.370 -999.990 -999.990 1.383 ..P WKT 2010 09 20 00 29 55 31.3200 -97.3300 251.000 457.0 136.642 3.800 -999.990 -999.990 1.366 ..P WKT 2010 09 20 00 34 55 31.3200 -97.3300 251.000 30.0 130.422 3.230 -999.990 -999.990 1.304 ..P WKT 2010 09 20 00 39 55 31.3200 -97.3300 251.000 122.0 131.388 3.420 -999.990 -999.990 1.314 ..P WKT 2010 09 20 00 44 55 31.3200 -97.3300 251.000 457.0 134.841 3.200 -999.990 -999.990 1.348 ..P WKT 2010 09 20 00 54 55 31.3200 -97.3300 251.000 30.0 130.432 3.990 -999.990 -999.990 1.304 ..P WKT 2010 09 20 00 59 55 31.3200 -97.3300 251.000 122.0 131.828 3.760 -999.990 -999.990 1.318 ..P WKT 2010 09 20 01 04 55 31.3200 -97.3300 251.000 457.0 130.322 4.140 -999.990 -999.990 1.303 ..P WKT 2010 09 20 01 09 55 31.3200 -97.3300 251.000 30.0 130.336 4.610 -999.990 -999.990 1.303 ..P WKT 2010 09 20 01 14 55 31.3200 -97.3300 251.000 122.0 130.903 4.340 -999.990 -999.990 1.309 ..P WKT 2010 09 20 01 19 55 31.3200 -97.3300 251.000 457.0 138.792 4.070 -999.990 -999.990 1.388 ..P WKT 2010 09 20 01 29 55 31.3200 -97.3300 251.000 30.0 125.044 4.290 -999.990 -999.990 1.250 ..P WKT 2010 09 20 01 34 55 31.3200 -97.3300 251.000 122.0 121.229 4.350 -999.990 -999.990 1.212 ..P WKT 2010 09 20 01 39 55 31.3200 -97.3300 251.000 457.0 140.211 4.630 -999.990 -999.990 1.402 ..P WKT 2010 09 20 01 44 55 31.3200 -97.3300 251.000 30.0 127.968 4.650 -999.990 -999.990 1.280 ..P WKT 2010 09 20 01 49 55 31.3200 -97.3300 251.000 122.0 124.706 4.730 -999.990 -999.990 1.247 ..P WKT 2010 09 20 01 54 55 31.3200 -97.3300 251.000 457.0 145.482 4.900 -999.990 -999.990 1.455 ..P WKT 2010 09 20 02 04 55 31.3200 -97.3300 251.000 30.0 132.702 4.580 -999.990 -999.990 1.327 ..P WKT 2010 09 20 02 09 55 31.3200 -97.3300 251.000 122.0 127.605 4.160 -999.990 -999.990 1.276 ..P WKT 2010 09 20 02 14 55 31.3200 -97.3300 251.000 457.0 147.373 5.240 -999.990 -999.990 1.474 ..P WKT 2010 09 20 02 19 55 31.3200 -97.3300 251.000 30.0 130.948 4.050 -999.990 -999.990 1.309 ..P WKT 2010 09 20 02 24 55 31.3200 -97.3300 251.000 122.0 117.839 5.270 -999.990 -999.990 1.178 ..P WKT 2010 09 20 02 29 55 31.3200 -97.3300 251.000 457.0 141.751 3.370 -999.990 -999.990 1.418 ..P WKT 2010 09 20 02 39 55 31.3200 -97.3300 251.000 30.0 120.329 3.560 -999.990 -999.990 1.203 ..P WKT 2010 09 20 02 44 55 31.3200 -97.3300 251.000 122.0 115.055 4.210 -999.990 -999.990 1.151 ..P WKT 2010 09 20 02 49 55 31.3200 -97.3300 251.000 457.0 137.959 3.410 -999.990 -999.990 1.380 ..P WKT 2010 09 20 02 54 55 31.3200 -97.3300 251.000 30.0 118.320 3.470 -999.990 -999.990 1.183 ..P WKT 2010 09 20 02 59 55 31.3200 -97.3300 251.000 122.0 114.703 4.360 -999.990 -999.990 1.147 ..P WKT 2010 09 20 03 04 55 31.3200 -97.3300 251.000 457.0 142.855 4.370 -999.990 -999.990 1.429 ..P WKT 2010 09 20 03 14 55 31.3200 -97.3300 251.000 30.0 118.100 3.590 -999.990 -999.990 1.181 ..P WKT 2010 09 20 03 19 55 31.3200 -97.3300 251.000 122.0 105.527 3.580 -999.990 -999.990 1.055 ..P WKT 2010 09 20 03 24 55 31.3200 -97.3300 251.000 457.0 137.978 3.770 -999.990 -999.990 1.380 ..P WKT 2010 09 20 03 29 55 31.3200 -97.3300 251.000 30.0 108.555 3.510 -999.990 -999.990 1.086 ..P WKT 2010 09 20 03 34 55 31.3200 -97.3300 251.000 122.0 103.992 5.550 -999.990 -999.990 1.040 ..P WKT 2010 09 20 03 39 55 31.3200 -97.3300 251.000 457.0 130.366 4.230 -999.990 -999.990 1.304 ..P WKT 2010 09 20 03 49 55 31.3200 -97.3300 251.000 30.0 104.194 3.940 -999.990 -999.990 1.042 ..P WKT 2010 09 20 03 54 55 31.3200 -97.3300 251.000 122.0 105.234 3.840 -999.990 -999.990 1.052 ..P WKT 2010 09 20 03 59 55 31.3200 -97.3300 251.000 457.0 115.527 3.400 -999.990 -999.990 1.155 ..P WKT 2010 09 20 04 04 55 31.3200 -97.3300 251.000 30.0 108.005 3.330 -999.990 -999.990 1.080 ..P WKT 2010 09 20 04 09 55 31.3200 -97.3300 251.000 122.0 108.493 3.540 -999.990 -999.990 1.085 ..P WKT 2010 09 20 04 14 55 31.3200 -97.3300 251.000 457.0 129.281 3.210 -999.990 -999.990 1.293 ..P WKT 2010 09 20 04 24 55 31.3200 -97.3300 251.000 30.0 118.755 3.080 -999.990 -999.990 1.188 ..P WKT 2010 09 20 04 29 55 31.3200 -97.3300 251.000 122.0 107.466 3.530 -999.990 -999.990 1.075 ..P WKT 2010 09 20 04 34 55 31.3200 -97.3300 251.000 457.0 101.700 2.770 -999.990 -999.990 1.017 ..P WKT 2010 09 20 04 39 55 31.3200 -97.3300 251.000 30.0 115.681 3.420 -999.990 -999.990 1.157 ..P WKT 2010 09 20 04 44 55 31.3200 -97.3300 251.000 122.0 109.364 3.520 -999.990 -999.990 1.094 ..P WKT 2010 09 20 04 49 55 31.3200 -97.3300 251.000 457.0 99.318 3.200 -999.990 -999.990 0.993 ..P WKT 2010 09 20 05 04 55 31.3200 -97.3300 251.000 30.0 115.156 3.900 -999.990 -999.990 1.152 ..P WKT 2010 09 20 05 09 55 31.3200 -97.3300 251.000 122.0 106.075 3.220 -999.990 -999.990 1.061 ..P WKT 2010 09 20 05 14 55 31.3200 -97.3300 251.000 457.0 117.705 3.550 -999.990 -999.990 1.177 ..P WKT 2010 09 20 05 19 55 31.3200 -97.3300 251.000 30.0 120.222 3.940 -999.990 -999.990 1.202 ..P WKT 2010 09 20 05 24 55 31.3200 -97.3300 251.000 122.0 105.480 3.390 -999.990 -999.990 1.055 ..P WKT 2010 09 20 05 29 55 31.3200 -97.3300 251.000 457.0 106.478 3.560 -999.990 -999.990 1.065 ..P WKT 2010 09 20 05 39 55 31.3200 -97.3300 251.000 30.0 110.824 3.310 -999.990 -999.990 1.108 ..P WKT 2010 09 20 05 44 55 31.3200 -97.3300 251.000 122.0 109.063 4.350 -999.990 -999.990 1.091 ..P WKT 2010 09 20 05 49 55 31.3200 -97.3300 251.000 457.0 109.512 3.590 -999.990 -999.990 1.095 ..P WKT 2010 09 20 05 54 55 31.3200 -97.3300 251.000 30.0 110.374 4.010 -999.990 -999.990 1.104 ..P WKT 2010 09 20 05 59 55 31.3200 -97.3300 251.000 122.0 99.089 3.430 -999.990 -999.990 0.991 ..P WKT 2010 09 20 06 04 55 31.3200 -97.3300 251.000 457.0 103.954 4.070 -999.990 -999.990 1.040 ..P WKT 2010 09 20 06 14 55 31.3200 -97.3300 251.000 30.0 109.071 2.390 -999.990 -999.990 1.091 ..P WKT 2010 09 20 06 19 55 31.3200 -97.3300 251.000 122.0 98.003 3.120 -999.990 -999.990 0.980 ..P WKT 2010 09 20 06 24 55 31.3200 -97.3300 251.000 457.0 104.052 3.690 -999.990 -999.990 1.041 ..P WKT 2010 09 20 06 29 55 31.3200 -97.3300 251.000 30.0 104.027 3.410 -999.990 -999.990 1.040 ..P WKT 2010 09 20 06 34 55 31.3200 -97.3300 251.000 122.0 98.481 2.340 -999.990 -999.990 0.985 ..P WKT 2010 09 20 06 39 55 31.3200 -97.3300 251.000 457.0 105.910 2.030 -999.990 -999.990 1.059 ..P WKT 2010 09 20 06 49 55 31.3200 -97.3300 251.000 30.0 115.837 2.530 -999.990 -999.990 1.158 ..P WKT 2010 09 20 06 54 55 31.3200 -97.3300 251.000 122.0 100.117 2.170 -999.990 -999.990 1.001 ..P WKT 2010 09 20 06 59 55 31.3200 -97.3300 251.000 457.0 109.793 3.400 -999.990 -999.990 1.098 ..P WKT 2010 09 20 07 04 55 31.3200 -97.3300 251.000 30.0 113.948 4.150 -999.990 -999.990 1.139 ..P WKT 2010 09 20 07 09 55 31.3200 -97.3300 251.000 122.0 97.124 2.100 -999.990 -999.990 0.971 ..P WKT 2010 09 20 07 14 55 31.3200 -97.3300 251.000 457.0 114.805 2.430 -999.990 -999.990 1.148 ..P WKT 2010 09 20 07 24 55 31.3200 -97.3300 251.000 30.0 119.290 4.030 -999.990 -999.990 1.193 ..P WKT 2010 09 20 07 29 55 31.3200 -97.3300 251.000 122.0 97.538 3.520 -999.990 -999.990 0.975 ..P WKT 2010 09 20 07 34 55 31.3200 -97.3300 251.000 457.0 98.696 3.440 -999.990 -999.990 0.987 ..P WKT 2010 09 20 07 39 55 31.3200 -97.3300 251.000 30.0 110.067 3.470 -999.990 -999.990 1.101 ..P WKT 2010 09 20 07 44 55 31.3200 -97.3300 251.000 122.0 102.944 3.200 -999.990 -999.990 1.029 ..P WKT 2010 09 20 07 49 55 31.3200 -97.3300 251.000 457.0 98.307 4.020 -999.990 -999.990 0.983 ..P WKT 2010 09 20 07 59 55 31.3200 -97.3300 251.000 30.0 114.324 3.850 -999.990 -999.990 1.143 ..P WKT 2010 09 20 08 04 55 31.3200 -97.3300 251.000 122.0 105.586 4.250 -999.990 -999.990 1.056 ..P WKT 2010 09 20 08 09 55 31.3200 -97.3300 251.000 457.0 108.714 3.880 -999.990 -999.990 1.087 ..P WKT 2010 09 20 08 14 55 31.3200 -97.3300 251.000 30.0 120.399 3.830 -999.990 -999.990 1.204 ..P WKT 2010 09 20 08 19 55 31.3200 -97.3300 251.000 122.0 112.351 2.680 -999.990 -999.990 1.124 ..P WKT 2010 09 20 08 24 55 31.3200 -97.3300 251.000 457.0 113.686 2.860 -999.990 -999.990 1.137 ..P WKT 2010 09 20 08 34 55 31.3200 -97.3300 251.000 30.0 110.837 2.840 -999.990 -999.990 1.108 ..P WKT 2010 09 20 08 39 55 31.3200 -97.3300 251.000 122.0 112.310 2.810 -999.990 -999.990 1.123 ..P WKT 2010 09 20 08 44 55 31.3200 -97.3300 251.000 457.0 103.711 2.910 -999.990 -999.990 1.037 ..P WKT 2010 09 20 08 49 55 31.3200 -97.3300 251.000 30.0 117.050 3.710 -999.990 -999.990 1.171 ..P WKT 2010 09 20 08 54 55 31.3200 -97.3300 251.000 122.0 109.968 2.200 -999.990 -999.990 1.100 ..P WKT 2010 09 20 08 59 55 31.3200 -97.3300 251.000 457.0 98.472 2.610 -999.990 -999.990 0.985 ..P WKT 2010 09 20 09 09 55 31.3200 -97.3300 251.000 30.0 118.113 2.510 -999.990 -999.990 1.181 ..P WKT 2010 09 20 09 14 55 31.3200 -97.3300 251.000 122.0 110.756 2.620 -999.990 -999.990 1.108 ..P WKT 2010 09 20 09 19 55 31.3200 -97.3300 251.000 457.0 114.436 3.150 -999.990 -999.990 1.144 ..P WKT 2010 09 20 09 24 55 31.3200 -97.3300 251.000 30.0 115.909 3.430 -999.990 -999.990 1.159 ..P WKT 2010 09 20 09 29 55 31.3200 -97.3300 251.000 122.0 108.690 2.630 -999.990 -999.990 1.087 ..P WKT 2010 09 20 09 34 55 31.3200 -97.3300 251.000 457.0 100.644 2.630 -999.990 -999.990 1.006 ..P WKT 2010 09 20 09 44 55 31.3200 -97.3300 251.000 30.0 117.011 3.360 -999.990 -999.990 1.170 ..P WKT 2010 09 20 09 49 55 31.3200 -97.3300 251.000 122.0 103.486 2.520 -999.990 -999.990 1.035 ..P WKT 2010 09 20 09 54 55 31.3200 -97.3300 251.000 457.0 102.653 2.410 -999.990 -999.990 1.027 ..P WKT 2010 09 20 09 59 55 31.3200 -97.3300 251.000 30.0 114.926 3.850 -999.990 -999.990 1.149 ..P WKT 2010 09 20 10 04 55 31.3200 -97.3300 251.000 122.0 104.023 2.760 -999.990 -999.990 1.040 ..P WKT 2010 09 20 10 09 55 31.3200 -97.3300 251.000 457.0 100.569 2.520 -999.990 -999.990 1.006 ..P WKT 2010 09 20 10 19 55 31.3200 -97.3300 251.000 30.0 117.467 2.220 -999.990 -999.990 1.175 ..P WKT 2010 09 20 10 24 55 31.3200 -97.3300 251.000 122.0 99.470 3.260 -999.990 -999.990 0.995 ..P WKT 2010 09 20 10 29 55 31.3200 -97.3300 251.000 457.0 101.337 4.070 -999.990 -999.990 1.013 ..P WKT 2010 09 20 10 34 55 31.3200 -97.3300 251.000 30.0 113.136 2.750 -999.990 -999.990 1.131 ..P WKT 2010 09 20 10 39 55 31.3200 -97.3300 251.000 122.0 102.313 4.150 -999.990 -999.990 1.023 ..P WKT 2010 09 20 10 44 55 31.3200 -97.3300 251.000 457.0 92.594 2.510 -999.990 -999.990 0.926 ..P WKT 2010 09 20 10 54 55 31.3200 -97.3300 251.000 30.0 111.066 3.160 -999.990 -999.990 1.111 ..P WKT 2010 09 20 10 59 55 31.3200 -97.3300 251.000 122.0 106.430 2.230 -999.990 -999.990 1.064 ..P WKT 2010 09 20 11 04 55 31.3200 -97.3300 251.000 457.0 103.174 3.390 -999.990 -999.990 1.032 ..P WKT 2010 09 20 11 09 55 31.3200 -97.3300 251.000 30.0 117.020 1.970 -999.990 -999.990 1.170 ..P WKT 2010 09 20 11 14 55 31.3200 -97.3300 251.000 122.0 100.248 1.720 -999.990 -999.990 1.002 ..P WKT 2010 09 20 11 19 55 31.3200 -97.3300 251.000 457.0 96.992 1.650 -999.990 -999.990 0.970 ..P WKT 2010 09 20 11 29 55 31.3200 -97.3300 251.000 30.0 106.646 2.120 -999.990 -999.990 1.066 ..P WKT 2010 09 20 11 34 55 31.3200 -97.3300 251.000 122.0 89.491 2.650 -999.990 -999.990 0.895 ..P WKT 2010 09 20 11 39 55 31.3200 -97.3300 251.000 457.0 94.678 2.160 -999.990 -999.990 0.947 ..P WKT 2010 09 20 11 44 55 31.3200 -97.3300 251.000 30.0 105.655 2.580 -999.990 -999.990 1.057 ..P WKT 2010 09 20 11 49 55 31.3200 -97.3300 251.000 122.0 96.499 3.590 -999.990 -999.990 0.965 ..P WKT 2010 09 20 12 09 55 31.3200 -97.3300 251.000 457.0 118.784 3.440 -999.990 -999.990 1.188 ..P WKT 2010 09 20 12 10 25 31.3200 -97.3300 251.000 457.0 119.320 4.150 -999.990 -999.990 1.193 ..P WKT 2010 09 20 12 10 55 31.3200 -97.3300 251.000 457.0 119.857 3.230 -999.990 -999.990 1.199 ..P WKT 2010 09 20 12 11 25 31.3200 -97.3300 251.000 457.0 116.119 3.730 -999.990 -999.990 1.161 ..P WKT 2010 09 20 12 11 55 31.3200 -97.3300 251.000 457.0 116.104 4.240 -999.990 -999.990 1.161 ..P WKT 2010 09 20 12 12 25 31.3200 -97.3300 251.000 457.0 121.330 3.260 -999.990 -999.990 1.213 ..P WKT 2010 09 20 12 12 55 31.3200 -97.3300 251.000 457.0 117.454 3.280 -999.990 -999.990 1.175 ..P WKT 2010 09 20 12 13 25 31.3200 -97.3300 251.000 457.0 117.026 3.380 -999.990 -999.990 1.170 ..P WKT 2010 09 20 12 13 55 31.3200 -97.3300 251.000 457.0 115.907 3.370 -999.990 -999.990 1.159 ..P WKT 2010 09 20 12 14 25 31.3200 -97.3300 251.000 457.0 119.065 3.690 -999.990 -999.990 1.191 ..P WKT 2010 09 20 12 14 55 31.3200 -97.3300 251.000 457.0 114.223 2.990 -999.990 -999.990 1.142 ..P WKT 2010 09 20 12 19 55 31.3200 -97.3300 251.000 30.0 106.213 3.820 -999.990 -999.990 1.062 ..P WKT 2010 09 20 12 24 55 31.3200 -97.3300 251.000 122.0 92.687 3.480 -999.990 -999.990 0.927 ..P WKT 2010 09 20 12 29 55 31.3200 -97.3300 251.000 457.0 104.814 3.830 -999.990 -999.990 1.048 ..P WKT 2010 09 20 12 34 55 31.3200 -97.3300 251.000 30.0 98.873 2.940 -999.990 -999.990 0.989 ..P WKT 2010 09 20 12 39 55 31.3200 -97.3300 251.000 122.0 98.035 3.200 -999.990 -999.990 0.980 ..P WKT 2010 09 20 12 44 55 31.3200 -97.3300 251.000 457.0 118.304 2.710 -999.990 -999.990 1.183 ..P WKT 2010 09 20 12 54 55 31.3200 -97.3300 251.000 30.0 123.249 2.910 -999.990 -999.990 1.232 ..P WKT 2010 09 20 12 59 55 31.3200 -97.3300 251.000 122.0 101.296 2.840 -999.990 -999.990 1.013 ..P WKT 2010 09 20 13 04 55 31.3200 -97.3300 251.000 457.0 120.876 2.940 -999.990 -999.990 1.209 ..P WKT 2010 09 20 13 09 55 31.3200 -97.3300 251.000 30.0 111.203 4.390 -999.990 -999.990 1.112 ..P WKT 2010 09 20 13 14 55 31.3200 -97.3300 251.000 122.0 104.426 4.040 -999.990 -999.990 1.044 ..P WKT 2010 09 20 13 19 55 31.3200 -97.3300 251.000 457.0 112.969 4.120 -999.990 -999.990 1.130 ..P WKT 2010 09 20 13 29 55 31.3200 -97.3300 251.000 30.0 110.495 3.260 -999.990 -999.990 1.105 ..P WKT 2010 09 20 13 34 55 31.3200 -97.3300 251.000 122.0 101.963 2.370 -999.990 -999.990 1.020 ..P WKT 2010 09 20 13 39 55 31.3200 -97.3300 251.000 457.0 110.270 3.130 -999.990 -999.990 1.103 ..P WKT 2010 09 20 13 44 55 31.3200 -97.3300 251.000 30.0 106.430 2.550 -999.990 -999.990 1.064 ..P WKT 2010 09 20 13 49 55 31.3200 -97.3300 251.000 122.0 99.415 2.180 -999.990 -999.990 0.994 ..P WKT 2010 09 20 13 54 55 31.3200 -97.3300 251.000 457.0 112.417 1.630 -999.990 -999.990 1.124 ..P WKT 2010 09 20 14 04 55 31.3200 -97.3300 251.000 30.0 118.327 3.040 -999.990 -999.990 1.183 ..P WKT 2010 09 20 14 09 55 31.3200 -97.3300 251.000 122.0 103.775 2.450 -999.990 -999.990 1.038 ..P WKT 2010 09 20 14 14 55 31.3200 -97.3300 251.000 457.0 117.116 2.940 -999.990 -999.990 1.171 ..P WKT 2010 09 20 14 19 55 31.3200 -97.3300 251.000 30.0 116.649 2.960 -999.990 -999.990 1.166 ..P WKT 2010 09 20 14 24 55 31.3200 -97.3300 251.000 122.0 109.276 2.890 -999.990 -999.990 1.093 ..P WKT 2010 09 20 14 29 55 31.3200 -97.3300 251.000 457.0 119.028 3.250 -999.990 -999.990 1.190 ..P WKT 2010 09 20 14 39 55 31.3200 -97.3300 251.000 30.0 103.728 2.030 -999.990 -999.990 1.037 ..P WKT 2010 09 20 14 44 55 31.3200 -97.3300 251.000 122.0 110.719 2.380 -999.990 -999.990 1.107 ..P WKT 2010 09 20 14 49 55 31.3200 -97.3300 251.000 457.0 123.236 4.720 -999.990 -999.990 1.232 ..P WKT 2010 09 20 14 54 55 31.3200 -97.3300 251.000 30.0 108.678 5.910 -999.990 -999.990 1.087 ..P WKT 2010 09 20 14 59 55 31.3200 -97.3300 251.000 122.0 101.025 4.220 -999.990 -999.990 1.010 ..P WKT 2010 09 20 15 04 55 31.3200 -97.3300 251.000 457.0 101.386 3.400 -999.990 -999.990 1.014 ..P WKT 2010 09 20 15 14 55 31.3200 -97.3300 251.000 30.0 113.101 3.090 -999.990 -999.990 1.131 ..P WKT 2010 09 20 15 19 55 31.3200 -97.3300 251.000 122.0 123.077 5.440 -999.990 -999.990 1.231 ..P WKT 2010 09 20 15 24 55 31.3200 -97.3300 251.000 457.0 109.007 5.160 -999.990 -999.990 1.090 ..P WKT 2010 09 20 15 29 55 31.3200 -97.3300 251.000 30.0 119.812 5.510 -999.990 -999.990 1.198 ..P WKT 2010 09 20 15 34 55 31.3200 -97.3300 251.000 122.0 130.065 5.410 -999.990 -999.990 1.301 ..P WKT 2010 09 20 15 39 55 31.3200 -97.3300 251.000 457.0 112.677 3.170 -999.990 -999.990 1.127 ..P WKT 2010 09 20 15 49 55 31.3200 -97.3300 251.000 30.0 126.393 3.350 -999.990 -999.990 1.264 ..P WKT 2010 09 20 15 54 55 31.3200 -97.3300 251.000 122.0 127.506 4.690 -999.990 -999.990 1.275 ..P WKT 2010 09 20 15 59 55 31.3200 -97.3300 251.000 457.0 113.549 6.370 -999.990 -999.990 1.135 ..P WKT 2010 09 20 16 04 55 31.3200 -97.3300 251.000 30.0 115.075 4.650 -999.990 -999.990 1.151 ..P WKT 2010 09 20 16 09 55 31.3200 -97.3300 251.000 122.0 118.538 3.290 -999.990 -999.990 1.185 ..P WKT 2010 09 20 16 14 55 31.3200 -97.3300 251.000 457.0 103.197 3.570 -999.990 -999.990 1.032 ..P WKT 2010 09 20 16 24 55 31.3200 -97.3300 251.000 30.0 111.366 2.340 -999.990 -999.990 1.114 ..P WKT 2010 09 20 16 29 55 31.3200 -97.3300 251.000 122.0 113.031 2.830 -999.990 -999.990 1.130 ..P WKT 2010 09 20 16 34 55 31.3200 -97.3300 251.000 457.0 105.568 3.250 -999.990 -999.990 1.056 ..P WKT 2010 09 20 16 39 55 31.3200 -97.3300 251.000 30.0 105.851 2.850 -999.990 -999.990 1.059 ..P WKT 2010 09 20 16 44 55 31.3200 -97.3300 251.000 122.0 110.144 2.720 -999.990 -999.990 1.101 ..P WKT 2010 09 20 16 49 55 31.3200 -97.3300 251.000 457.0 102.542 2.720 -999.990 -999.990 1.025 ..P WKT 2010 09 20 17 04 55 31.3200 -97.3300 251.000 30.0 113.037 3.810 -999.990 -999.990 1.130 ..P WKT 2010 09 20 17 09 55 31.3200 -97.3300 251.000 122.0 114.893 3.400 -999.990 -999.990 1.149 ..P WKT 2010 09 20 17 14 55 31.3200 -97.3300 251.000 457.0 113.429 2.640 -999.990 -999.990 1.134 ..P WKT 2010 09 20 17 19 55 31.3200 -97.3300 251.000 30.0 107.813 2.930 -999.990 -999.990 1.078 ..P WKT 2010 09 20 17 24 55 31.3200 -97.3300 251.000 122.0 117.972 3.040 -999.990 -999.990 1.180 ..P WKT 2010 09 20 17 29 55 31.3200 -97.3300 251.000 457.0 112.633 2.340 -999.990 -999.990 1.126 ..P WKT 2010 09 20 17 39 55 31.3200 -97.3300 251.000 30.0 100.023 1.730 -999.990 -999.990 1.000 ..P WKT 2010 09 20 17 44 55 31.3200 -97.3300 251.000 122.0 109.223 3.380 -999.990 -999.990 1.092 ..P WKT 2010 09 20 17 49 55 31.3200 -97.3300 251.000 457.0 105.827 1.710 -999.990 -999.990 1.058 ..P WKT 2010 09 20 17 54 55 31.3200 -97.3300 251.000 30.0 104.923 2.540 -999.990 -999.990 1.049 ..P WKT 2010 09 20 17 59 55 31.3200 -97.3300 251.000 122.0 107.065 2.170 -999.990 -999.990 1.071 ..P WKT 2010 09 20 18 04 55 31.3200 -97.3300 251.000 457.0 110.867 2.550 -999.990 -999.990 1.109 ..P WKT 2010 09 20 18 14 55 31.3200 -97.3300 251.000 30.0 102.255 1.900 -999.990 -999.990 1.023 ..P WKT 2010 09 20 18 19 55 31.3200 -97.3300 251.000 122.0 113.930 1.830 -999.990 -999.990 1.139 ..P WKT 2010 09 20 18 24 55 31.3200 -97.3300 251.000 457.0 110.652 2.550 -999.990 -999.990 1.107 ..P WKT 2010 09 20 18 29 55 31.3200 -97.3300 251.000 30.0 105.159 2.380 -999.990 -999.990 1.052 ..P WKT 2010 09 20 18 34 55 31.3200 -97.3300 251.000 122.0 112.128 2.130 -999.990 -999.990 1.121 ..P WKT 2010 09 20 18 39 55 31.3200 -97.3300 251.000 457.0 102.479 2.840 -999.990 -999.990 1.025 ..P WKT 2010 09 20 18 49 55 31.3200 -97.3300 251.000 30.0 103.202 3.660 -999.990 -999.990 1.032 ..P WKT 2010 09 20 18 54 55 31.3200 -97.3300 251.000 122.0 112.190 2.330 -999.990 -999.990 1.122 ..P WKT 2010 09 20 18 59 55 31.3200 -97.3300 251.000 457.0 106.497 2.280 -999.990 -999.990 1.065 ..P WKT 2010 09 20 19 04 55 31.3200 -97.3300 251.000 30.0 104.405 2.100 -999.990 -999.990 1.044 ..P WKT 2010 09 20 19 09 55 31.3200 -97.3300 251.000 122.0 115.334 1.850 -999.990 -999.990 1.153 ..P WKT 2010 09 20 19 14 55 31.3200 -97.3300 251.000 457.0 107.147 1.950 -999.990 -999.990 1.071 ..P WKT 2010 09 20 19 24 55 31.3200 -97.3300 251.000 30.0 102.368 3.430 -999.990 -999.990 1.024 ..P WKT 2010 09 20 19 29 55 31.3200 -97.3300 251.000 122.0 115.754 2.030 -999.990 -999.990 1.158 ..P WKT 2010 09 20 19 34 55 31.3200 -97.3300 251.000 457.0 106.694 2.680 -999.990 -999.990 1.067 ..P WKT 2010 09 20 19 39 55 31.3200 -97.3300 251.000 30.0 106.363 4.110 -999.990 -999.990 1.064 ..P WKT 2010 09 20 19 44 55 31.3200 -97.3300 251.000 122.0 106.586 2.290 -999.990 -999.990 1.066 ..P WKT 2010 09 20 19 49 55 31.3200 -97.3300 251.000 457.0 105.285 3.180 -999.990 -999.990 1.053 ..P WKT 2010 09 20 19 59 55 31.3200 -97.3300 251.000 30.0 113.236 2.190 -999.990 -999.990 1.132 ..P WKT 2010 09 20 20 04 55 31.3200 -97.3300 251.000 122.0 102.112 4.410 -999.990 -999.990 1.021 ..P WKT 2010 09 20 20 09 55 31.3200 -97.3300 251.000 457.0 103.603 3.890 -999.990 -999.990 1.036 ..P WKT 2010 09 20 20 14 55 31.3200 -97.3300 251.000 30.0 98.578 4.330 -999.990 -999.990 0.986 ..P WKT 2010 09 20 20 19 55 31.3200 -97.3300 251.000 122.0 104.643 4.720 -999.990 -999.990 1.046 ..P WKT 2010 09 20 20 24 55 31.3200 -97.3300 251.000 457.0 99.479 4.840 -999.990 -999.990 0.995 ..P WKT 2010 09 20 20 34 55 31.3200 -97.3300 251.000 30.0 92.576 6.040 -999.990 -999.990 0.926 ..P WKT 2010 09 20 20 39 55 31.3200 -97.3300 251.000 122.0 110.805 5.090 -999.990 -999.990 1.108 ..P WKT 2010 09 20 20 44 55 31.3200 -97.3300 251.000 457.0 114.753 4.830 -999.990 -999.990 1.148 ..P WKT 2010 09 20 20 49 55 31.3200 -97.3300 251.000 30.0 99.564 4.860 -999.990 -999.990 0.996 ..P WKT 2010 09 20 20 54 55 31.3200 -97.3300 251.000 122.0 116.132 4.020 -999.990 -999.990 1.161 ..P WKT 2010 09 20 20 59 55 31.3200 -97.3300 251.000 457.0 113.146 4.150 -999.990 -999.990 1.131 ..P WKT 2010 09 20 21 09 55 31.3200 -97.3300 251.000 30.0 114.723 3.810 -999.990 -999.990 1.147 ..P WKT 2010 09 20 21 14 55 31.3200 -97.3300 251.000 122.0 117.761 2.990 -999.990 -999.990 1.178 ..P WKT 2010 09 20 21 19 55 31.3200 -97.3300 251.000 457.0 113.447 3.210 -999.990 -999.990 1.134 ..P WKT 2010 09 20 21 24 55 31.3200 -97.3300 251.000 30.0 110.797 3.230 -999.990 -999.990 1.108 ..P WKT 2010 09 20 21 29 55 31.3200 -97.3300 251.000 122.0 114.667 3.210 -999.990 -999.990 1.147 ..P WKT 2010 09 20 21 34 55 31.3200 -97.3300 251.000 457.0 104.803 3.310 -999.990 -999.990 1.048 ..P WKT 2010 09 20 21 44 55 31.3200 -97.3300 251.000 30.0 107.193 3.080 -999.990 -999.990 1.072 ..P WKT 2010 09 20 21 49 55 31.3200 -97.3300 251.000 122.0 112.233 3.410 -999.990 -999.990 1.122 ..P WKT 2010 09 20 21 54 55 31.3200 -97.3300 251.000 457.0 108.393 5.200 -999.990 -999.990 1.084 ..P WKT 2010 09 20 22 00 25 31.3200 -97.3300 251.000 30.0 108.113 3.330 -999.990 -999.990 1.081 ..P WKT 2010 09 20 22 00 55 31.3200 -97.3300 251.000 30.0 111.001 3.570 -999.990 -999.990 1.110 ..P WKT 2010 09 20 22 01 25 31.3200 -97.3300 251.000 30.0 107.147 4.070 -999.990 -999.990 1.071 ..P WKT 2010 09 20 22 01 55 31.3200 -97.3300 251.000 30.0 105.792 4.040 -999.990 -999.990 1.058 ..P WKT 2010 09 20 22 02 25 31.3200 -97.3300 251.000 30.0 102.077 4.300 -999.990 -999.990 1.021 ..P WKT 2010 09 20 22 02 55 31.3200 -97.3300 251.000 30.0 111.963 4.180 -999.990 -999.990 1.120 ..P WKT 2010 09 20 22 03 25 31.3200 -97.3300 251.000 30.0 104.223 4.350 -999.990 -999.990 1.042 ..P WKT 2010 09 20 22 03 55 31.3200 -97.3300 251.000 30.0 110.778 4.260 -999.990 -999.990 1.108 ..P WKT 2010 09 20 22 04 25 31.3200 -97.3300 251.000 30.0 106.370 3.780 -999.990 -999.990 1.064 ..P WKT 2010 09 20 22 04 55 31.3200 -97.3300 251.000 30.0 107.789 3.690 -999.990 -999.990 1.078 ..P WKT 2010 09 20 22 09 55 31.3200 -97.3300 251.000 457.0 114.774 4.620 -999.990 -999.990 1.148 ..P WKT 2010 09 20 22 19 55 31.3200 -97.3300 251.000 30.0 113.597 3.890 -999.990 -999.990 1.136 ..P WKT 2010 09 20 22 24 55 31.3200 -97.3300 251.000 122.0 114.039 2.900 -999.990 -999.990 1.140 ..P WKT 2010 09 20 22 29 55 31.3200 -97.3300 251.000 457.0 109.067 3.390 -999.990 -999.990 1.091 ..P WKT 2010 09 20 22 34 55 31.3200 -97.3300 251.000 30.0 113.813 3.650 -999.990 -999.990 1.138 ..P WKT 2010 09 20 22 39 55 31.3200 -97.3300 251.000 122.0 118.420 2.800 -999.990 -999.990 1.184 ..P WKT 2010 09 20 22 44 55 31.3200 -97.3300 251.000 457.0 109.837 2.570 -999.990 -999.990 1.098 ..P WKT 2010 09 20 22 54 55 31.3200 -97.3300 251.000 30.0 111.317 1.790 -999.990 -999.990 1.113 ..P WKT 2010 09 20 22 59 55 31.3200 -97.3300 251.000 122.0 108.743 2.290 -999.990 -999.990 1.087 ..P WKT 2010 09 20 23 04 55 31.3200 -97.3300 251.000 457.0 112.836 2.370 -999.990 -999.990 1.128 ..P WKT 2010 09 20 23 09 55 31.3200 -97.3300 251.000 30.0 110.818 3.070 -999.990 -999.990 1.108 ..P WKT 2010 09 20 23 14 55 31.3200 -97.3300 251.000 122.0 112.689 2.940 -999.990 -999.990 1.127 ..P WKT 2010 09 20 23 19 55 31.3200 -97.3300 251.000 457.0 115.393 4.450 -999.990 -999.990 1.154 ..P WKT 2010 09 20 23 29 55 31.3200 -97.3300 251.000 30.0 107.824 1.880 -999.990 -999.990 1.078 ..P WKT 2010 09 20 23 34 55 31.3200 -97.3300 251.000 122.0 116.999 2.320 -999.990 -999.990 1.170 ..P WKT 2010 09 20 23 39 55 31.3200 -97.3300 251.000 457.0 107.279 2.380 -999.990 -999.990 1.073 ..P WKT 2010 09 20 23 44 55 31.3200 -97.3300 251.000 30.0 106.729 2.980 -999.990 -999.990 1.067 ..P WKT 2010 09 20 23 49 55 31.3200 -97.3300 251.000 122.0 120.074 4.880 -999.990 -999.990 1.201 ..P WKT 2010 09 21 00 09 55 31.3200 -97.3300 251.000 457.0 97.925 3.000 -999.990 -999.990 0.979 ..P WKT 2010 09 21 00 10 25 31.3200 -97.3300 251.000 457.0 101.049 2.820 -999.990 -999.990 1.010 ..P WKT 2010 09 21 00 10 55 31.3200 -97.3300 251.000 457.0 99.725 2.580 -999.990 -999.990 0.997 ..P WKT 2010 09 21 00 11 25 31.3200 -97.3300 251.000 457.0 98.124 2.900 -999.990 -999.990 0.981 ..P WKT 2010 09 21 00 11 55 31.3200 -97.3300 251.000 457.0 97.635 3.270 -999.990 -999.990 0.976 ..P WKT 2010 09 21 00 12 25 31.3200 -97.3300 251.000 457.0 108.542 2.760 -999.990 -999.990 1.085 ..P WKT 2010 09 21 00 12 55 31.3200 -97.3300 251.000 457.0 101.937 2.730 -999.990 -999.990 1.019 ..P WKT 2010 09 21 00 13 25 31.3200 -97.3300 251.000 457.0 104.505 3.480 -999.990 -999.990 1.045 ..P WKT 2010 09 21 00 13 55 31.3200 -97.3300 251.000 457.0 104.571 4.200 -999.990 -999.990 1.046 ..P WKT 2010 09 21 00 14 25 31.3200 -97.3300 251.000 457.0 101.580 3.080 -999.990 -999.990 1.016 ..P WKT 2010 09 21 00 14 55 31.3200 -97.3300 251.000 457.0 102.758 2.530 -999.990 -999.990 1.028 ..P WKT 2010 09 21 00 19 55 31.3200 -97.3300 251.000 30.0 114.263 3.030 -999.990 -999.990 1.143 ..P WKT 2010 09 21 00 24 55 31.3200 -97.3300 251.000 122.0 118.820 3.060 -999.990 -999.990 1.188 ..P WKT 2010 09 21 00 29 55 31.3200 -97.3300 251.000 457.0 93.351 3.760 -999.990 -999.990 0.934 ..P WKT 2010 09 21 00 34 55 31.3200 -97.3300 251.000 30.0 117.090 4.560 -999.990 -999.990 1.171 ..P WKT 2010 09 21 00 39 55 31.3200 -97.3300 251.000 122.0 119.702 4.190 -999.990 -999.990 1.197 ..P WKT 2010 09 21 00 44 55 31.3200 -97.3300 251.000 457.0 91.170 2.330 -999.990 -999.990 0.912 ..P WKT 2010 09 21 00 54 55 31.3200 -97.3300 251.000 30.0 109.376 2.460 -999.990 -999.990 1.094 ..P WKT 2010 09 21 00 59 55 31.3200 -97.3300 251.000 122.0 112.737 3.490 -999.990 -999.990 1.127 ..P WKT 2010 09 21 01 04 55 31.3200 -97.3300 251.000 457.0 100.108 3.900 -999.990 -999.990 1.001 ..P WKT 2010 09 21 01 09 55 31.3200 -97.3300 251.000 30.0 108.754 3.450 -999.990 -999.990 1.088 ..P WKT 2010 09 21 01 14 55 31.3200 -97.3300 251.000 122.0 102.659 2.480 -999.990 -999.990 1.027 ..P WKT 2010 09 21 01 19 55 31.3200 -97.3300 251.000 457.0 93.225 4.020 -999.990 -999.990 0.932 ..P WKT 2010 09 21 01 29 55 31.3200 -97.3300 251.000 30.0 97.783 2.590 -999.990 -999.990 0.978 ..P WKT 2010 09 21 01 34 55 31.3200 -97.3300 251.000 122.0 102.874 5.030 -999.990 -999.990 1.029 ..P WKT 2010 09 21 01 39 55 31.3200 -97.3300 251.000 457.0 94.750 2.930 -999.990 -999.990 0.948 ..P WKT 2010 09 21 01 44 55 31.3200 -97.3300 251.000 30.0 102.763 2.070 -999.990 -999.990 1.028 ..P WKT 2010 09 21 01 49 55 31.3200 -97.3300 251.000 122.0 105.212 2.150 -999.990 -999.990 1.052 ..P WKT 2010 09 21 01 54 55 31.3200 -97.3300 251.000 457.0 92.356 2.050 -999.990 -999.990 0.924 ..P WKT 2010 09 21 02 04 55 31.3200 -97.3300 251.000 30.0 105.244 2.630 -999.990 -999.990 1.052 ..P WKT 2010 09 21 02 09 55 31.3200 -97.3300 251.000 122.0 105.805 2.510 -999.990 -999.990 1.058 ..P WKT 2010 09 21 02 14 55 31.3200 -97.3300 251.000 457.0 93.424 3.230 -999.990 -999.990 0.934 ..P WKT 2010 09 21 02 19 55 31.3200 -97.3300 251.000 30.0 108.179 3.850 -999.990 -999.990 1.082 ..P WKT 2010 09 21 02 24 55 31.3200 -97.3300 251.000 122.0 109.854 3.920 -999.990 -999.990 1.099 ..P WKT 2010 09 21 02 29 55 31.3200 -97.3300 251.000 457.0 97.053 3.390 -999.990 -999.990 0.971 ..P WKT 2010 09 21 02 39 55 31.3200 -97.3300 251.000 30.0 102.967 3.430 -999.990 -999.990 1.030 ..P WKT 2010 09 21 02 44 55 31.3200 -97.3300 251.000 122.0 110.547 3.200 -999.990 -999.990 1.105 ..P WKT 2010 09 21 02 49 55 31.3200 -97.3300 251.000 457.0 94.463 2.680 -999.990 -999.990 0.945 ..P WKT 2010 09 21 02 54 55 31.3200 -97.3300 251.000 30.0 96.058 2.380 -999.990 -999.990 0.961 ..P WKT 2010 09 21 02 59 55 31.3200 -97.3300 251.000 122.0 104.336 3.630 -999.990 -999.990 1.043 ..P WKT 2010 09 21 03 04 55 31.3200 -97.3300 251.000 457.0 88.945 2.180 -999.990 -999.990 0.889 ..P WKT 2010 09 21 03 14 55 31.3200 -97.3300 251.000 30.0 105.005 3.530 -999.990 -999.990 1.050 ..P WKT 2010 09 21 03 19 55 31.3200 -97.3300 251.000 122.0 99.976 2.240 -999.990 -999.990 1.000 ..P WKT 2010 09 21 03 24 55 31.3200 -97.3300 251.000 457.0 94.947 3.600 -999.990 -999.990 0.949 ..P WKT 2010 09 21 03 29 55 31.3200 -97.3300 251.000 30.0 97.437 1.940 -999.990 -999.990 0.974 ..P WKT 2010 09 21 03 34 55 31.3200 -97.3300 251.000 122.0 94.636 2.320 -999.990 -999.990 0.946 ..P WKT 2010 09 21 03 39 55 31.3200 -97.3300 251.000 457.0 91.556 1.920 -999.990 -999.990 0.916 ..P WKT 2010 09 21 03 49 55 31.3200 -97.3300 251.000 30.0 97.056 2.510 -999.990 -999.990 0.971 ..P WKT 2010 09 21 03 54 55 31.3200 -97.3300 251.000 122.0 107.865 3.730 -999.990 -999.990 1.079 ..P WKT 2010 09 21 03 59 55 31.3200 -97.3300 251.000 457.0 92.207 2.930 -999.990 -999.990 0.922 ..P WKT 2010 09 21 04 04 55 31.3200 -97.3300 251.000 30.0 100.232 2.360 -999.990 -999.990 1.002 ..P WKT 2010 09 21 04 09 55 31.3200 -97.3300 251.000 122.0 106.863 2.950 -999.990 -999.990 1.069 ..P WKT 2010 09 21 04 14 55 31.3200 -97.3300 251.000 457.0 94.547 2.960 -999.990 -999.990 0.945 ..P WKT 2010 09 21 04 24 55 31.3200 -97.3300 251.000 30.0 101.840 4.160 -999.990 -999.990 1.018 ..P WKT 2010 09 21 04 29 55 31.3200 -97.3300 251.000 122.0 96.370 3.410 -999.990 -999.990 0.964 ..P WKT 2010 09 21 04 34 55 31.3200 -97.3300 251.000 457.0 88.948 2.980 -999.990 -999.990 0.889 ..P WKT 2010 09 21 04 39 55 31.3200 -97.3300 251.000 30.0 103.545 3.320 -999.990 -999.990 1.035 ..P WKT 2010 09 21 04 44 55 31.3200 -97.3300 251.000 122.0 92.360 2.810 -999.990 -999.990 0.924 ..P WKT 2010 09 21 04 49 55 31.3200 -97.3300 251.000 457.0 89.675 2.600 -999.990 -999.990 0.897 ..P WKT 2010 09 21 05 04 55 31.3200 -97.3300 251.000 30.0 102.500 4.420 -999.990 -999.990 1.025 ..P WKT 2010 09 21 05 09 55 31.3200 -97.3300 251.000 122.0 95.410 3.060 -999.990 -999.990 0.954 ..P WKT 2010 09 21 05 14 55 31.3200 -97.3300 251.000 457.0 97.102 3.540 -999.990 -999.990 0.971 ..P WKT 2010 09 21 05 19 55 31.3200 -97.3300 251.000 30.0 115.524 3.610 -999.990 -999.990 1.155 ..P WKT 2010 09 21 05 24 55 31.3200 -97.3300 251.000 122.0 98.673 4.460 -999.990 -999.990 0.987 ..P WKT 2010 09 21 05 29 55 31.3200 -97.3300 251.000 457.0 93.254 4.090 -999.990 -999.990 0.933 ..P WKT 2010 09 21 05 39 55 31.3200 -97.3300 251.000 30.0 110.588 3.910 -999.990 -999.990 1.106 ..P WKT 2010 09 21 05 44 55 31.3200 -97.3300 251.000 122.0 96.945 4.470 -999.990 -999.990 0.969 ..P WKT 2010 09 21 05 49 55 31.3200 -97.3300 251.000 457.0 98.364 3.250 -999.990 -999.990 0.984 ..P WKT 2010 09 21 05 54 55 31.3200 -97.3300 251.000 30.0 116.519 3.650 -999.990 -999.990 1.165 ..P WKT 2010 09 21 05 59 55 31.3200 -97.3300 251.000 122.0 101.899 3.790 -999.990 -999.990 1.019 ..P WKT 2010 09 21 06 04 55 31.3200 -97.3300 251.000 457.0 98.575 2.940 -999.990 -999.990 0.986 ..P WKT 2010 09 21 06 14 55 31.3200 -97.3300 251.000 30.0 116.438 3.830 -999.990 -999.990 1.164 ..P WKT 2010 09 21 06 19 55 31.3200 -97.3300 251.000 122.0 97.312 3.620 -999.990 -999.990 0.973 ..P WKT 2010 09 21 06 24 55 31.3200 -97.3300 251.000 457.0 99.388 3.680 -999.990 -999.990 0.994 ..P WKT 2010 09 21 06 29 55 31.3200 -97.3300 251.000 30.0 115.835 3.760 -999.990 -999.990 1.158 ..P WKT 2010 09 21 06 34 55 31.3200 -97.3300 251.000 122.0 98.659 4.030 -999.990 -999.990 0.987 ..P WKT 2010 09 21 06 39 55 31.3200 -97.3300 251.000 457.0 95.573 4.120 -999.990 -999.990 0.956 ..P WKT 2010 09 21 06 49 55 31.3200 -97.3300 251.000 30.0 117.888 3.560 -999.990 -999.990 1.179 ..P WKT 2010 09 21 06 54 55 31.3200 -97.3300 251.000 122.0 96.542 4.960 -999.990 -999.990 0.965 ..P WKT 2010 09 21 06 59 55 31.3200 -97.3300 251.000 457.0 154.741 7.330 -999.990 -999.990 1.547 ..P WKT 2010 09 21 07 04 55 31.3200 -97.3300 251.000 30.0 126.137 3.180 -999.990 -999.990 1.261 ..P WKT 2010 09 21 07 09 55 31.3200 -97.3300 251.000 122.0 96.135 3.760 -999.990 -999.990 0.961 ..P WKT 2010 09 21 07 14 55 31.3200 -97.3300 251.000 457.0 112.190 3.090 -999.990 -999.990 1.122 ..P WKT 2010 09 21 07 24 55 31.3200 -97.3300 251.000 30.0 137.167 3.950 -999.990 -999.990 1.372 ..P WKT 2010 09 21 07 29 55 31.3200 -97.3300 251.000 122.0 94.994 2.920 -999.990 -999.990 0.950 ..P WKT 2010 09 21 07 34 55 31.3200 -97.3300 251.000 457.0 101.679 5.430 -999.990 -999.990 1.017 ..P WKT 2010 09 21 07 39 55 31.3200 -97.3300 251.000 30.0 121.209 5.680 -999.990 -999.990 1.212 ..P WKT 2010 09 21 07 44 55 31.3200 -97.3300 251.000 122.0 92.433 5.140 -999.990 -999.990 0.924 ..P WKT 2010 09 21 07 49 55 31.3200 -97.3300 251.000 457.0 129.277 5.660 -999.990 -999.990 1.293 ..P WKT 2010 09 21 07 59 55 31.3200 -97.3300 251.000 30.0 112.971 3.570 -999.990 -999.990 1.130 ..P WKT 2010 09 21 08 04 55 31.3200 -97.3300 251.000 122.0 98.074 4.750 -999.990 -999.990 0.981 ..P WKT 2010 09 21 08 09 55 31.3200 -97.3300 251.000 457.0 104.681 5.050 -999.990 -999.990 1.047 ..P WKT 2010 09 21 08 14 55 31.3200 -97.3300 251.000 30.0 111.569 4.710 -999.990 -999.990 1.116 ..P WKT 2010 09 21 08 19 55 31.3200 -97.3300 251.000 122.0 100.580 4.370 -999.990 -999.990 1.006 ..P WKT 2010 09 21 08 24 55 31.3200 -97.3300 251.000 457.0 115.010 3.630 -999.990 -999.990 1.150 ..P WKT 2010 09 21 08 34 55 31.3200 -97.3300 251.000 30.0 111.029 3.600 -999.990 -999.990 1.110 ..P WKT 2010 09 21 08 39 55 31.3200 -97.3300 251.000 122.0 100.158 4.150 -999.990 -999.990 1.002 ..P WKT 2010 09 21 08 44 55 31.3200 -97.3300 251.000 457.0 97.108 4.850 -999.990 -999.990 0.971 ..P WKT 2010 09 21 08 49 55 31.3200 -97.3300 251.000 30.0 122.698 5.340 -999.990 -999.990 1.227 ..P WKT 2010 09 21 08 54 55 31.3200 -97.3300 251.000 122.0 104.002 4.290 -999.990 -999.990 1.040 ..P WKT 2010 09 21 08 59 55 31.3200 -97.3300 251.000 457.0 94.246 4.670 -999.990 -999.990 0.942 ..P WKT 2010 09 21 09 09 55 31.3200 -97.3300 251.000 30.0 114.255 5.490 -999.990 -999.990 1.143 ..P WKT 2010 09 21 09 14 55 31.3200 -97.3300 251.000 122.0 97.352 5.140 -999.990 -999.990 0.974 ..P WKT 2010 09 21 09 19 55 31.3200 -97.3300 251.000 457.0 98.474 4.830 -999.990 -999.990 0.985 ..P WKT 2010 09 21 09 24 55 31.3200 -97.3300 251.000 30.0 116.925 6.620 -999.990 -999.990 1.169 ..P WKT 2010 09 21 09 29 55 31.3200 -97.3300 251.000 122.0 102.815 4.680 -999.990 -999.990 1.028 ..P WKT 2010 09 21 09 34 55 31.3200 -97.3300 251.000 457.0 102.539 4.200 -999.990 -999.990 1.025 ..P WKT 2010 09 21 09 44 55 31.3200 -97.3300 251.000 30.0 111.494 4.190 -999.990 -999.990 1.115 ..P WKT 2010 09 21 09 49 55 31.3200 -97.3300 251.000 122.0 100.036 5.270 -999.990 -999.990 1.000 ..P WKT 2010 09 21 09 54 55 31.3200 -97.3300 251.000 457.0 92.772 5.280 -999.990 -999.990 0.928 ..P WKT 2010 09 21 09 59 55 31.3200 -97.3300 251.000 30.0 108.991 4.970 -999.990 -999.990 1.090 ..P WKT 2010 09 21 10 04 55 31.3200 -97.3300 251.000 122.0 105.780 3.990 -999.990 -999.990 1.058 ..P WKT 2010 09 21 10 09 55 31.3200 -97.3300 251.000 457.0 90.126 3.430 -999.990 -999.990 0.901 ..P WKT 2010 09 21 10 19 55 31.3200 -97.3300 251.000 30.0 102.258 5.010 -999.990 -999.990 1.023 ..P WKT 2010 09 21 10 24 55 31.3200 -97.3300 251.000 122.0 96.490 3.880 -999.990 -999.990 0.965 ..P WKT 2010 09 21 10 29 55 31.3200 -97.3300 251.000 457.0 88.623 4.530 -999.990 -999.990 0.886 ..P WKT 2010 09 21 10 34 55 31.3200 -97.3300 251.000 30.0 111.241 4.710 -999.990 -999.990 1.112 ..P WKT 2010 09 21 10 39 55 31.3200 -97.3300 251.000 122.0 104.773 3.670 -999.990 -999.990 1.048 ..P WKT 2010 09 21 10 44 55 31.3200 -97.3300 251.000 457.0 88.794 3.510 -999.990 -999.990 0.888 ..P WKT 2010 09 21 10 54 55 31.3200 -97.3300 251.000 30.0 105.166 3.770 -999.990 -999.990 1.052 ..P WKT 2010 09 21 10 59 55 31.3200 -97.3300 251.000 122.0 107.868 3.900 -999.990 -999.990 1.079 ..P WKT 2010 09 21 11 04 55 31.3200 -97.3300 251.000 457.0 90.148 4.600 -999.990 -999.990 0.901 ..P WKT 2010 09 21 11 09 55 31.3200 -97.3300 251.000 30.0 98.445 4.060 -999.990 -999.990 0.984 ..P WKT 2010 09 21 11 14 55 31.3200 -97.3300 251.000 122.0 105.624 4.100 -999.990 -999.990 1.056 ..P WKT 2010 09 21 11 19 55 31.3200 -97.3300 251.000 457.0 86.782 3.930 -999.990 -999.990 0.868 ..P WKT 2010 09 21 11 29 55 31.3200 -97.3300 251.000 30.0 99.017 4.100 -999.990 -999.990 0.990 ..P WKT 2010 09 21 11 34 55 31.3200 -97.3300 251.000 122.0 95.957 4.160 -999.990 -999.990 0.960 ..P WKT 2010 09 21 11 39 55 31.3200 -97.3300 251.000 457.0 84.223 4.500 -999.990 -999.990 0.842 ..P WKT 2010 09 21 11 44 55 31.3200 -97.3300 251.000 30.0 95.995 5.350 -999.990 -999.990 0.960 ..P WKT 2010 09 21 11 49 55 31.3200 -97.3300 251.000 122.0 108.330 4.490 -999.990 -999.990 1.083 ..P WKT 2010 09 21 12 09 55 31.3200 -97.3300 251.000 457.0 94.768 5.150 -999.990 -999.990 0.948 ..P WKT 2010 09 21 12 10 25 31.3200 -97.3300 251.000 457.0 85.534 4.850 -999.990 -999.990 0.855 ..P WKT 2010 09 21 12 10 55 31.3200 -97.3300 251.000 457.0 91.694 4.550 -999.990 -999.990 0.917 ..P WKT 2010 09 21 12 11 25 31.3200 -97.3300 251.000 457.0 88.338 4.690 -999.990 -999.990 0.883 ..P WKT 2010 09 21 12 11 55 31.3200 -97.3300 251.000 457.0 90.299 4.570 -999.990 -999.990 0.903 ..P WKT 2010 09 21 12 12 25 31.3200 -97.3300 251.000 457.0 87.502 4.420 -999.990 -999.990 0.875 ..P WKT 2010 09 21 12 12 55 31.3200 -97.3300 251.000 457.0 94.502 5.060 -999.990 -999.990 0.945 ..P WKT 2010 09 21 12 13 25 31.3200 -97.3300 251.000 457.0 90.585 5.240 -999.990 -999.990 0.906 ..P WKT 2010 09 21 12 13 55 31.3200 -97.3300 251.000 457.0 91.427 4.620 -999.990 -999.990 0.914 ..P WKT 2010 09 21 12 14 25 31.3200 -97.3300 251.000 457.0 86.391 4.650 -999.990 -999.990 0.864 ..P WKT 2010 09 21 12 14 55 31.3200 -97.3300 251.000 457.0 88.072 4.990 -999.990 -999.990 0.881 ..P WKT 2010 09 21 12 19 55 31.3200 -97.3300 251.000 30.0 102.370 4.560 -999.990 -999.990 1.024 ..P WKT 2010 09 21 12 24 55 31.3200 -97.3300 251.000 122.0 96.514 4.740 -999.990 -999.990 0.965 ..P WKT 2010 09 21 12 29 55 31.3200 -97.3300 251.000 457.0 89.398 4.540 -999.990 -999.990 0.894 ..P WKT 2010 09 21 12 34 55 31.3200 -97.3300 251.000 30.0 105.795 4.670 -999.990 -999.990 1.058 ..P WKT 2010 09 21 12 39 55 31.3200 -97.3300 251.000 122.0 92.101 4.540 -999.990 -999.990 0.921 ..P WKT 2010 09 21 12 44 55 31.3200 -97.3300 251.000 457.0 87.504 4.650 -999.990 -999.990 0.875 ..P WKT 2010 09 21 12 54 55 31.3200 -97.3300 251.000 30.0 110.244 4.050 -999.990 -999.990 1.102 ..P WKT 2010 09 21 12 59 55 31.3200 -97.3300 251.000 122.0 109.306 3.840 -999.990 -999.990 1.093 ..P WKT 2010 09 21 13 04 55 31.3200 -97.3300 251.000 457.0 90.871 3.820 -999.990 -999.990 0.909 ..P WKT 2010 09 21 13 09 55 31.3200 -97.3300 251.000 30.0 113.590 3.940 -999.990 -999.990 1.136 ..P WKT 2010 09 21 13 14 55 31.3200 -97.3300 251.000 122.0 127.491 4.440 -999.990 -999.990 1.275 ..P WKT 2010 09 21 13 19 55 31.3200 -97.3300 251.000 457.0 88.477 4.060 -999.990 -999.990 0.885 ..P WKT 2010 09 21 13 29 55 31.3200 -97.3300 251.000 30.0 111.820 4.110 -999.990 -999.990 1.118 ..P WKT 2010 09 21 13 34 55 31.3200 -97.3300 251.000 122.0 134.001 3.710 -999.990 -999.990 1.340 ..P WKT 2010 09 21 13 39 55 31.3200 -97.3300 251.000 457.0 87.586 4.720 -999.990 -999.990 0.876 ..P WKT 2010 09 21 13 44 55 31.3200 -97.3300 251.000 30.0 106.967 3.670 -999.990 -999.990 1.070 ..P WKT 2010 09 21 13 49 55 31.3200 -97.3300 251.000 122.0 132.229 4.500 -999.990 -999.990 1.322 ..P WKT 2010 09 21 13 54 55 31.3200 -97.3300 251.000 457.0 88.191 3.430 -999.990 -999.990 0.882 ..P WKT 2010 09 21 14 04 55 31.3200 -97.3300 251.000 30.0 115.416 3.480 -999.990 -999.990 1.154 ..P WKT 2010 09 21 14 09 55 31.3200 -97.3300 251.000 122.0 116.678 4.670 -999.990 -999.990 1.167 ..P WKT 2010 09 21 14 14 55 31.3200 -97.3300 251.000 457.0 92.319 4.110 -999.990 -999.990 0.923 ..P WKT 2010 09 21 14 19 55 31.3200 -97.3300 251.000 30.0 110.943 3.550 -999.990 -999.990 1.109 ..P WKT 2010 09 21 14 24 55 31.3200 -97.3300 251.000 122.0 115.146 3.720 -999.990 -999.990 1.151 ..P WKT 2010 09 21 14 29 55 31.3200 -97.3300 251.000 457.0 88.544 3.200 -999.990 -999.990 0.885 ..P WKT 2010 09 21 14 39 55 31.3200 -97.3300 251.000 30.0 113.553 3.290 -999.990 -999.990 1.136 ..P WKT 2010 09 21 14 44 55 31.3200 -97.3300 251.000 122.0 116.016 3.230 -999.990 -999.990 1.160 ..P WKT 2010 09 21 14 49 55 31.3200 -97.3300 251.000 457.0 89.632 3.390 -999.990 -999.990 0.896 ..P WKT 2010 09 21 14 54 55 31.3200 -97.3300 251.000 30.0 113.660 3.420 -999.990 -999.990 1.137 ..P WKT 2010 09 21 14 59 55 31.3200 -97.3300 251.000 122.0 117.242 4.300 -999.990 -999.990 1.172 ..P WKT 2010 09 21 15 04 55 31.3200 -97.3300 251.000 457.0 98.141 4.220 -999.990 -999.990 0.981 ..P WKT 2010 09 21 15 14 55 31.3200 -97.3300 251.000 30.0 117.870 4.030 -999.990 -999.990 1.179 ..P WKT 2010 09 21 15 19 55 31.3200 -97.3300 251.000 122.0 130.096 3.930 -999.990 -999.990 1.301 ..P WKT 2010 09 21 15 24 55 31.3200 -97.3300 251.000 457.0 103.111 3.800 -999.990 -999.990 1.031 ..P WKT 2010 09 21 15 29 55 31.3200 -97.3300 251.000 30.0 124.580 3.920 -999.990 -999.990 1.246 ..P WKT 2010 09 21 15 34 55 31.3200 -97.3300 251.000 122.0 124.763 4.340 -999.990 -999.990 1.248 ..P WKT 2010 09 21 15 39 55 31.3200 -97.3300 251.000 457.0 88.253 3.750 -999.990 -999.990 0.883 ..P WKT 2010 09 21 15 49 55 31.3200 -97.3300 251.000 30.0 134.635 4.180 -999.990 -999.990 1.346 ..P WKT 2010 09 21 15 54 55 31.3200 -97.3300 251.000 122.0 128.454 3.770 -999.990 -999.990 1.285 ..P WKT 2010 09 21 15 59 55 31.3200 -97.3300 251.000 457.0 104.627 3.770 -999.990 -999.990 1.046 ..P WKT 2010 09 21 16 04 55 31.3200 -97.3300 251.000 30.0 131.781 4.210 -999.990 -999.990 1.318 ..P WKT 2010 09 21 16 09 55 31.3200 -97.3300 251.000 122.0 131.204 3.900 -999.990 -999.990 1.312 ..P WKT 2010 09 21 16 14 55 31.3200 -97.3300 251.000 457.0 119.701 3.150 -999.990 -999.990 1.197 ..P WKT 2010 09 21 16 24 55 31.3200 -97.3300 251.000 30.0 128.230 3.290 -999.990 -999.990 1.282 ..P WKT 2010 09 21 16 29 55 31.3200 -97.3300 251.000 122.0 125.011 3.110 -999.990 -999.990 1.250 ..P WKT 2010 09 21 16 34 55 31.3200 -97.3300 251.000 457.0 113.948 3.300 -999.990 -999.990 1.139 ..P WKT 2010 09 21 16 39 55 31.3200 -97.3300 251.000 30.0 116.472 3.880 -999.990 -999.990 1.165 ..P WKT 2010 09 21 16 44 55 31.3200 -97.3300 251.000 122.0 113.113 2.810 -999.990 -999.990 1.131 ..P WKT 2010 09 21 16 49 55 31.3200 -97.3300 251.000 457.0 108.212 2.950 -999.990 -999.990 1.082 ..P WKT 2010 09 21 17 04 55 31.3200 -97.3300 251.000 30.0 109.381 2.570 -999.990 -999.990 1.094 ..P WKT 2010 09 21 17 09 55 31.3200 -97.3300 251.000 122.0 114.656 2.890 -999.990 -999.990 1.147 ..P WKT 2010 09 21 17 14 55 31.3200 -97.3300 251.000 457.0 106.203 2.830 -999.990 -999.990 1.062 ..P WKT 2010 09 21 17 19 55 31.3200 -97.3300 251.000 30.0 108.257 2.980 -999.990 -999.990 1.083 ..P WKT 2010 09 21 17 24 55 31.3200 -97.3300 251.000 122.0 110.591 3.290 -999.990 -999.990 1.106 ..P WKT 2010 09 21 17 29 55 31.3200 -97.3300 251.000 457.0 98.775 3.420 -999.990 -999.990 0.988 ..P WKT 2010 09 21 17 39 55 31.3200 -97.3300 251.000 30.0 98.209 2.950 -999.990 -999.990 0.982 ..P WKT 2010 09 21 17 44 55 31.3200 -97.3300 251.000 122.0 103.155 2.970 -999.990 -999.990 1.032 ..P WKT 2010 09 21 17 49 55 31.3200 -97.3300 251.000 457.0 100.114 3.140 -999.990 -999.990 1.001 ..P WKT 2010 09 21 17 54 55 31.3200 -97.3300 251.000 30.0 94.833 3.420 -999.990 -999.990 0.948 ..P WKT 2010 09 21 17 59 55 31.3200 -97.3300 251.000 122.0 107.485 4.710 -999.990 -999.990 1.075 ..P WKT 2010 09 21 18 04 55 31.3200 -97.3300 251.000 457.0 96.038 2.840 -999.990 -999.990 0.960 ..P WKT 2010 09 21 18 14 55 31.3200 -97.3300 251.000 30.0 102.327 2.930 -999.990 -999.990 1.023 ..P WKT 2010 09 21 18 19 55 31.3200 -97.3300 251.000 122.0 108.154 3.480 -999.990 -999.990 1.082 ..P WKT 2010 09 21 18 24 55 31.3200 -97.3300 251.000 457.0 98.429 3.370 -999.990 -999.990 0.984 ..P WKT 2010 09 21 18 29 55 31.3200 -97.3300 251.000 30.0 107.199 4.560 -999.990 -999.990 1.072 ..P WKT 2010 09 21 18 34 55 31.3200 -97.3300 251.000 122.0 106.721 4.190 -999.990 -999.990 1.067 ..P WKT 2010 09 21 18 39 55 31.3200 -97.3300 251.000 457.0 107.083 4.610 -999.990 -999.990 1.071 ..P WKT 2010 09 21 18 49 55 31.3200 -97.3300 251.000 30.0 108.189 5.180 -999.990 -999.990 1.082 ..P WKT 2010 09 21 18 54 55 31.3200 -97.3300 251.000 122.0 120.984 4.500 -999.990 -999.990 1.210 ..P WKT 2010 09 21 18 59 55 31.3200 -97.3300 251.000 457.0 117.803 4.920 -999.990 -999.990 1.178 ..P WKT 2010 09 21 19 04 55 31.3200 -97.3300 251.000 30.0 117.986 3.930 -999.990 -999.990 1.180 ..P WKT 2010 09 21 19 09 55 31.3200 -97.3300 251.000 122.0 125.176 4.250 -999.990 -999.990 1.252 ..P WKT 2010 09 21 19 14 55 31.3200 -97.3300 251.000 457.0 119.192 3.680 -999.990 -999.990 1.192 ..P WKT 2010 09 21 19 24 55 31.3200 -97.3300 251.000 30.0 109.908 2.780 -999.990 -999.990 1.099 ..P WKT 2010 09 21 19 29 55 31.3200 -97.3300 251.000 122.0 115.576 4.110 -999.990 -999.990 1.156 ..P WKT 2010 09 21 19 34 55 31.3200 -97.3300 251.000 457.0 114.798 3.210 -999.990 -999.990 1.148 ..P WKT 2010 09 21 19 39 55 31.3200 -97.3300 251.000 30.0 105.330 2.450 -999.990 -999.990 1.053 ..P WKT 2010 09 21 19 44 55 31.3200 -97.3300 251.000 122.0 115.484 2.260 -999.990 -999.990 1.155 ..P WKT 2010 09 21 19 49 55 31.3200 -97.3300 251.000 457.0 111.061 2.850 -999.990 -999.990 1.111 ..P WKT 2010 09 21 19 59 55 31.3200 -97.3300 251.000 30.0 109.204 3.060 -999.990 -999.990 1.092 ..P WKT 2010 09 21 20 04 55 31.3200 -97.3300 251.000 122.0 111.209 2.440 -999.990 -999.990 1.112 ..P WKT 2010 09 21 20 09 55 31.3200 -97.3300 251.000 457.0 106.766 3.490 -999.990 -999.990 1.068 ..P WKT 2010 09 21 20 14 55 31.3200 -97.3300 251.000 30.0 101.482 2.750 -999.990 -999.990 1.015 ..P WKT 2010 09 21 20 19 55 31.3200 -97.3300 251.000 122.0 114.701 2.480 -999.990 -999.990 1.147 ..P WKT 2010 09 21 20 24 55 31.3200 -97.3300 251.000 457.0 107.314 2.390 -999.990 -999.990 1.073 ..P WKT 2010 09 21 20 34 55 31.3200 -97.3300 251.000 30.0 106.238 2.800 -999.990 -999.990 1.062 ..P WKT 2010 09 21 20 39 55 31.3200 -97.3300 251.000 122.0 105.960 2.590 -999.990 -999.990 1.060 ..P WKT 2010 09 21 20 44 55 31.3200 -97.3300 251.000 457.0 104.841 2.150 -999.990 -999.990 1.048 ..P WKT 2010 09 21 20 49 55 31.3200 -97.3300 251.000 30.0 104.563 4.190 -999.990 -999.990 1.046 ..P WKT 2010 09 21 20 54 55 31.3200 -97.3300 251.000 122.0 110.032 4.860 -999.990 -999.990 1.100 ..P WKT 2010 09 21 20 59 55 31.3200 -97.3300 251.000 457.0 107.371 3.120 -999.990 -999.990 1.074 ..P WKT 2010 09 21 21 09 55 31.3200 -97.3300 251.000 30.0 108.137 2.190 -999.990 -999.990 1.081 ..P WKT 2010 09 21 21 14 55 31.3200 -97.3300 251.000 122.0 111.704 2.870 -999.990 -999.990 1.117 ..P WKT 2010 09 21 21 19 55 31.3200 -97.3300 251.000 457.0 114.290 2.630 -999.990 -999.990 1.143 ..P WKT 2010 09 21 21 24 55 31.3200 -97.3300 251.000 30.0 101.455 2.190 -999.990 -999.990 1.015 ..P WKT 2010 09 21 21 29 55 31.3200 -97.3300 251.000 122.0 103.480 3.780 -999.990 -999.990 1.035 ..P WKT 2010 09 21 21 34 55 31.3200 -97.3300 251.000 457.0 101.720 3.540 -999.990 -999.990 1.017 ..P WKT 2010 09 21 21 44 55 31.3200 -97.3300 251.000 30.0 99.943 2.160 -999.990 -999.990 0.999 ..P WKT 2010 09 21 21 49 55 31.3200 -97.3300 251.000 122.0 109.178 2.530 -999.990 -999.990 1.092 ..P WKT 2010 09 21 21 54 55 31.3200 -97.3300 251.000 457.0 103.412 2.920 -999.990 -999.990 1.034 ..P WKT 2010 09 21 21 59 55 31.3200 -97.3300 251.000 30.0 101.573 3.510 -999.990 -999.990 1.016 ..P WKT 2010 09 21 22 04 55 31.3200 -97.3300 251.000 122.0 106.743 3.510 -999.990 -999.990 1.067 ..P WKT 2010 09 21 22 09 55 31.3200 -97.3300 251.000 457.0 103.781 2.840 -999.990 -999.990 1.038 ..P WKT 2010 09 21 22 19 55 31.3200 -97.3300 251.000 30.0 102.604 3.170 -999.990 -999.990 1.026 ..P WKT 2010 09 21 22 24 55 31.3200 -97.3300 251.000 122.0 102.847 2.930 -999.990 -999.990 1.028 ..P WKT 2010 09 21 22 29 55 31.3200 -97.3300 251.000 457.0 106.173 3.670 -999.990 -999.990 1.062 ..P WKT 2010 09 21 22 34 55 31.3200 -97.3300 251.000 30.0 105.295 3.960 -999.990 -999.990 1.053 ..P WKT 2010 09 21 22 39 55 31.3200 -97.3300 251.000 122.0 105.257 4.260 -999.990 -999.990 1.053 ..P WKT 2010 09 21 22 44 55 31.3200 -97.3300 251.000 457.0 99.050 3.230 -999.990 -999.990 0.991 ..P WKT 2010 09 21 22 54 55 31.3200 -97.3300 251.000 30.0 101.679 3.830 -999.990 -999.990 1.017 ..P WKT 2010 09 21 22 59 55 31.3200 -97.3300 251.000 122.0 102.102 4.710 -999.990 -999.990 1.021 ..P WKT 2010 09 21 23 04 55 31.3200 -97.3300 251.000 457.0 101.965 4.300 -999.990 -999.990 1.020 ..P WKT 2010 09 21 23 09 55 31.3200 -97.3300 251.000 30.0 99.303 3.390 -999.990 -999.990 0.993 ..P WKT 2010 09 21 23 14 55 31.3200 -97.3300 251.000 122.0 107.017 2.080 -999.990 -999.990 1.070 ..P WKT 2010 09 21 23 19 55 31.3200 -97.3300 251.000 457.0 101.270 2.570 -999.990 -999.990 1.013 ..P WKT 2010 09 21 23 29 55 31.3200 -97.3300 251.000 30.0 92.355 3.800 -999.990 -999.990 0.924 ..P WKT 2010 09 21 23 34 55 31.3200 -97.3300 251.000 122.0 90.590 5.450 -999.990 -999.990 0.906 ..P WKT 2010 09 21 23 39 55 31.3200 -97.3300 251.000 457.0 86.580 2.500 -999.990 -999.990 0.866 ..P WKT 2010 09 21 23 44 55 31.3200 -97.3300 251.000 30.0 91.546 2.360 -999.990 -999.990 0.915 ..P WKT 2010 09 21 23 49 55 31.3200 -97.3300 251.000 122.0 97.073 2.610 -999.990 -999.990 0.971 ..P WKT 2010 09 22 00 09 55 31.3200 -97.3300 251.000 457.0 98.212 2.690 -999.990 -999.990 0.982 ..P WKT 2010 09 22 00 10 25 31.3200 -97.3300 251.000 457.0 99.927 2.940 -999.990 -999.990 0.999 ..P WKT 2010 09 22 00 10 55 31.3200 -97.3300 251.000 457.0 102.763 2.550 -999.990 -999.990 1.028 ..P WKT 2010 09 22 00 11 25 31.3200 -97.3300 251.000 457.0 98.588 2.340 -999.990 -999.990 0.986 ..P WKT 2010 09 22 00 11 55 31.3200 -97.3300 251.000 457.0 101.425 2.350 -999.990 -999.990 1.014 ..P WKT 2010 09 22 00 12 25 31.3200 -97.3300 251.000 457.0 102.859 3.200 -999.990 -999.990 1.029 ..P WKT 2010 09 22 00 12 55 31.3200 -97.3300 251.000 457.0 99.525 4.430 -999.990 -999.990 0.995 ..P WKT 2010 09 22 00 13 25 31.3200 -97.3300 251.000 457.0 95.771 3.270 -999.990 -999.990 0.958 ..P WKT 2010 09 22 00 13 55 31.3200 -97.3300 251.000 457.0 99.309 5.150 -999.990 -999.990 0.993 ..P WKT 2010 09 22 00 14 25 31.3200 -97.3300 251.000 457.0 101.724 3.360 -999.990 -999.990 1.017 ..P WKT 2010 09 22 00 14 55 31.3200 -97.3300 251.000 457.0 96.428 2.860 -999.990 -999.990 0.964 ..P WKT 2010 09 22 00 19 55 31.3200 -97.3300 251.000 30.0 101.795 2.850 -999.990 -999.990 1.018 ..P WKT 2010 09 22 00 24 55 31.3200 -97.3300 251.000 122.0 99.730 3.590 -999.990 -999.990 0.997 ..P WKT 2010 09 22 00 29 55 31.3200 -97.3300 251.000 457.0 91.919 3.320 -999.990 -999.990 0.919 ..P WKT 2010 09 22 00 34 55 31.3200 -97.3300 251.000 30.0 97.284 2.200 -999.990 -999.990 0.973 ..P WKT 2010 09 22 00 39 55 31.3200 -97.3300 251.000 122.0 102.929 4.460 -999.990 -999.990 1.029 ..P WKT 2010 09 22 00 44 55 31.3200 -97.3300 251.000 457.0 96.100 2.270 -999.990 -999.990 0.961 ..P WKT 2010 09 22 00 54 55 31.3200 -97.3300 251.000 30.0 95.311 2.930 -999.990 -999.990 0.953 ..P WKT 2010 09 22 00 59 55 31.3200 -97.3300 251.000 122.0 99.246 3.950 -999.990 -999.990 0.992 ..P WKT 2010 09 22 01 04 55 31.3200 -97.3300 251.000 457.0 98.977 2.670 -999.990 -999.990 0.990 ..P WKT 2010 09 22 01 09 55 31.3200 -97.3300 251.000 30.0 99.409 2.480 -999.990 -999.990 0.994 ..P WKT 2010 09 22 01 14 55 31.3200 -97.3300 251.000 122.0 102.222 2.820 -999.990 -999.990 1.022 ..P WKT 2010 09 22 01 19 55 31.3200 -97.3300 251.000 457.0 103.775 3.760 -999.990 -999.990 1.038 ..P WKT 2010 09 22 01 29 55 31.3200 -97.3300 251.000 30.0 103.758 4.880 -999.990 -999.990 1.038 ..P WKT 2010 09 22 01 34 55 31.3200 -97.3300 251.000 122.0 101.489 2.940 -999.990 -999.990 1.015 ..P WKT 2010 09 22 01 39 55 31.3200 -97.3300 251.000 457.0 101.460 2.590 -999.990 -999.990 1.015 ..P WKT 2010 09 22 01 44 55 31.3200 -97.3300 251.000 30.0 104.652 3.380 -999.990 -999.990 1.047 ..P WKT 2010 09 22 01 49 55 31.3200 -97.3300 251.000 122.0 102.664 3.770 -999.990 -999.990 1.027 ..P WKT 2010 09 22 01 54 55 31.3200 -97.3300 251.000 457.0 105.434 2.940 -999.990 -999.990 1.054 ..P WKT 2010 09 22 02 04 55 31.3200 -97.3300 251.000 30.0 105.497 3.410 -999.990 -999.990 1.055 ..P WKT 2010 09 22 02 09 55 31.3200 -97.3300 251.000 122.0 108.527 3.360 -999.990 -999.990 1.085 ..P WKT 2010 09 22 02 14 55 31.3200 -97.3300 251.000 457.0 103.441 3.780 -999.990 -999.990 1.034 ..P WKT 2010 09 22 02 19 55 31.3200 -97.3300 251.000 30.0 108.569 4.400 -999.990 -999.990 1.086 ..P WKT 2010 09 22 02 24 55 31.3200 -97.3300 251.000 122.0 107.541 3.180 -999.990 -999.990 1.075 ..P WKT 2010 09 22 02 29 55 31.3200 -97.3300 251.000 457.0 116.026 2.420 -999.990 -999.990 1.160 ..P WKT 2010 09 22 02 39 55 31.3200 -97.3300 251.000 30.0 109.073 2.460 -999.990 -999.990 1.091 ..P WKT 2010 09 22 02 44 55 31.3200 -97.3300 251.000 122.0 111.541 3.070 -999.990 -999.990 1.115 ..P WKT 2010 09 22 02 49 55 31.3200 -97.3300 251.000 457.0 114.289 3.790 -999.990 -999.990 1.143 ..P WKT 2010 09 22 02 54 55 31.3200 -97.3300 251.000 30.0 115.358 3.680 -999.990 -999.990 1.154 ..P WKT 2010 09 22 02 59 55 31.3200 -97.3300 251.000 122.0 118.944 4.770 -999.990 -999.990 1.189 ..P WKT 2010 09 22 03 04 55 31.3200 -97.3300 251.000 457.0 110.506 3.300 -999.990 -999.990 1.105 ..P WKT 2010 09 22 03 14 55 31.3200 -97.3300 251.000 30.0 118.515 3.280 -999.990 -999.990 1.185 ..P WKT 2010 09 22 03 19 55 31.3200 -97.3300 251.000 122.0 117.906 3.480 -999.990 -999.990 1.179 ..P WKT 2010 09 22 03 24 55 31.3200 -97.3300 251.000 457.0 114.503 2.980 -999.990 -999.990 1.145 ..P WKT 2010 09 22 03 29 55 31.3200 -97.3300 251.000 30.0 111.658 2.860 -999.990 -999.990 1.117 ..P WKT 2010 09 22 03 34 55 31.3200 -97.3300 251.000 122.0 112.448 5.210 -999.990 -999.990 1.124 ..P WKT 2010 09 22 03 39 55 31.3200 -97.3300 251.000 457.0 107.648 3.540 -999.990 -999.990 1.076 ..P WKT 2010 09 22 03 49 55 31.3200 -97.3300 251.000 30.0 119.464 2.570 -999.990 -999.990 1.195 ..P WKT 2010 09 22 03 54 55 31.3200 -97.3300 251.000 122.0 109.536 4.710 -999.990 -999.990 1.095 ..P WKT 2010 09 22 03 59 55 31.3200 -97.3300 251.000 457.0 111.623 3.000 -999.990 -999.990 1.116 ..P WKT 2010 09 22 04 04 55 31.3200 -97.3300 251.000 30.0 119.015 2.690 -999.990 -999.990 1.190 ..P WKT 2010 09 22 04 09 55 31.3200 -97.3300 251.000 122.0 114.257 3.810 -999.990 -999.990 1.143 ..P WKT 2010 09 22 04 14 55 31.3200 -97.3300 251.000 457.0 111.176 2.610 -999.990 -999.990 1.112 ..P WKT 2010 09 22 04 24 55 31.3200 -97.3300 251.000 30.0 115.366 2.900 -999.990 -999.990 1.154 ..P WKT 2010 09 22 04 29 55 31.3200 -97.3300 251.000 122.0 118.866 3.350 -999.990 -999.990 1.189 ..P WKT 2010 09 22 04 34 55 31.3200 -97.3300 251.000 457.0 112.315 2.540 -999.990 -999.990 1.123 ..P WKT 2010 09 22 04 39 55 31.3200 -97.3300 251.000 30.0 113.024 4.020 -999.990 -999.990 1.130 ..P WKT 2010 09 22 04 44 55 31.3200 -97.3300 251.000 122.0 112.197 2.910 -999.990 -999.990 1.122 ..P WKT 2010 09 22 04 49 55 31.3200 -97.3300 251.000 457.0 107.323 2.990 -999.990 -999.990 1.073 ..P WKT 2010 09 22 05 04 55 31.3200 -97.3300 251.000 30.0 122.107 3.190 -999.990 -999.990 1.221 ..P WKT 2010 09 22 05 09 55 31.3200 -97.3300 251.000 122.0 117.213 3.400 -999.990 -999.990 1.172 ..P WKT 2010 09 22 05 14 55 31.3200 -97.3300 251.000 457.0 116.646 3.420 -999.990 -999.990 1.166 ..P WKT 2010 09 22 05 19 55 31.3200 -97.3300 251.000 30.0 124.169 3.180 -999.990 -999.990 1.242 ..P WKT 2010 09 22 05 24 55 31.3200 -97.3300 251.000 122.0 120.532 3.420 -999.990 -999.990 1.205 ..P WKT 2010 09 22 05 29 55 31.3200 -97.3300 251.000 457.0 115.641 3.860 -999.990 -999.990 1.156 ..P WKT 2010 09 22 05 39 55 31.3200 -97.3300 251.000 30.0 118.012 3.740 -999.990 -999.990 1.180 ..P WKT 2010 09 22 05 44 55 31.3200 -97.3300 251.000 122.0 126.667 3.150 -999.990 -999.990 1.267 ..P WKT 2010 09 22 05 49 55 31.3200 -97.3300 251.000 457.0 116.639 2.790 -999.990 -999.990 1.166 ..P WKT 2010 09 22 05 54 55 31.3200 -97.3300 251.000 30.0 123.898 3.480 -999.990 -999.990 1.239 ..P WKT 2010 09 22 05 59 55 31.3200 -97.3300 251.000 122.0 130.738 3.070 -999.990 -999.990 1.307 ..P WKT 2010 09 22 06 04 55 31.3200 -97.3300 251.000 457.0 108.864 2.140 -999.990 -999.990 1.089 ..P WKT 2010 09 22 06 14 55 31.3200 -97.3300 251.000 30.0 117.566 2.510 -999.990 -999.990 1.176 ..P WKT 2010 09 22 06 19 55 31.3200 -97.3300 251.000 122.0 113.575 1.890 -999.990 -999.990 1.136 ..P WKT 2010 09 22 06 24 55 31.3200 -97.3300 251.000 457.0 103.732 5.490 -999.990 -999.990 1.037 ..P WKT 2010 09 22 06 29 55 31.3200 -97.3300 251.000 30.0 112.004 2.440 -999.990 -999.990 1.120 ..P WKT 2010 09 22 06 34 55 31.3200 -97.3300 251.000 122.0 109.129 3.030 -999.990 -999.990 1.091 ..P WKT 2010 09 22 06 39 55 31.3200 -97.3300 251.000 457.0 100.961 2.530 -999.990 -999.990 1.010 ..P WKT 2010 09 22 06 49 55 31.3200 -97.3300 251.000 30.0 112.086 2.590 -999.990 -999.990 1.121 ..P WKT 2010 09 22 06 54 55 31.3200 -97.3300 251.000 122.0 130.819 4.000 -999.990 -999.990 1.308 ..P WKT 2010 09 22 06 59 55 31.3200 -97.3300 251.000 457.0 110.834 2.830 -999.990 -999.990 1.108 ..P WKT 2010 09 22 07 04 55 31.3200 -97.3300 251.000 30.0 118.145 2.180 -999.990 -999.990 1.181 ..P WKT 2010 09 22 07 09 55 31.3200 -97.3300 251.000 122.0 112.646 3.150 -999.990 -999.990 1.126 ..P WKT 2010 09 22 07 14 55 31.3200 -97.3300 251.000 457.0 101.022 3.130 -999.990 -999.990 1.010 ..P WKT 2010 09 22 07 24 55 31.3200 -97.3300 251.000 30.0 118.027 2.330 -999.990 -999.990 1.180 ..P WKT 2010 09 22 07 29 55 31.3200 -97.3300 251.000 122.0 113.523 1.820 -999.990 -999.990 1.135 ..P WKT 2010 09 22 07 34 55 31.3200 -97.3300 251.000 457.0 109.021 2.950 -999.990 -999.990 1.090 ..P WKT 2010 09 22 07 39 55 31.3200 -97.3300 251.000 30.0 115.373 2.870 -999.990 -999.990 1.154 ..P WKT 2010 09 22 07 44 55 31.3200 -97.3300 251.000 122.0 116.438 4.100 -999.990 -999.990 1.164 ..P WKT 2010 09 22 07 49 55 31.3200 -97.3300 251.000 457.0 113.049 1.830 -999.990 -999.990 1.130 ..P WKT 2010 09 22 07 59 55 31.3200 -97.3300 251.000 30.0 129.922 3.230 -999.990 -999.990 1.299 ..P WKT 2010 09 22 08 04 55 31.3200 -97.3300 251.000 122.0 126.255 2.020 -999.990 -999.990 1.263 ..P WKT 2010 09 22 08 09 55 31.3200 -97.3300 251.000 457.0 104.786 3.220 -999.990 -999.990 1.048 ..P WKT 2010 09 22 08 14 55 31.3200 -97.3300 251.000 30.0 127.407 3.140 -999.990 -999.990 1.274 ..P WKT 2010 09 22 08 19 55 31.3200 -97.3300 251.000 122.0 119.430 3.260 -999.990 -999.990 1.194 ..P WKT 2010 09 22 08 24 55 31.3200 -97.3300 251.000 457.0 150.112 4.070 -999.990 -999.990 1.501 ..P WKT 2010 09 22 08 34 55 31.3200 -97.3300 251.000 30.0 127.564 2.510 -999.990 -999.990 1.276 ..P WKT 2010 09 22 08 39 55 31.3200 -97.3300 251.000 122.0 120.503 3.230 -999.990 -999.990 1.205 ..P WKT 2010 09 22 08 44 55 31.3200 -97.3300 251.000 457.0 109.134 3.970 -999.990 -999.990 1.091 ..P WKT 2010 09 22 08 49 55 31.3200 -97.3300 251.000 30.0 137.659 3.710 -999.990 -999.990 1.377 ..P WKT 2010 09 22 08 54 55 31.3200 -97.3300 251.000 122.0 120.593 3.300 -999.990 -999.990 1.206 ..P WKT 2010 09 22 08 59 55 31.3200 -97.3300 251.000 457.0 122.706 4.390 -999.990 -999.990 1.227 ..P WKT 2010 09 22 09 09 55 31.3200 -97.3300 251.000 30.0 129.317 3.600 -999.990 -999.990 1.293 ..P WKT 2010 09 22 09 14 55 31.3200 -97.3300 251.000 122.0 128.392 4.460 -999.990 -999.990 1.284 ..P WKT 2010 09 22 09 19 55 31.3200 -97.3300 251.000 457.0 105.241 4.000 -999.990 -999.990 1.052 ..P WKT 2010 09 22 09 24 55 31.3200 -97.3300 251.000 30.0 121.962 3.750 -999.990 -999.990 1.220 ..P WKT 2010 09 22 09 29 55 31.3200 -97.3300 251.000 122.0 119.650 4.700 -999.990 -999.990 1.197 ..P WKT 2010 09 22 09 34 55 31.3200 -97.3300 251.000 457.0 110.255 4.250 -999.990 -999.990 1.103 ..P WKT 2010 09 22 09 44 55 31.3200 -97.3300 251.000 30.0 123.965 3.290 -999.990 -999.990 1.240 ..P WKT 2010 09 22 09 49 55 31.3200 -97.3300 251.000 122.0 132.623 2.930 -999.990 -999.990 1.326 ..P WKT 2010 09 22 09 54 55 31.3200 -97.3300 251.000 457.0 113.928 3.050 -999.990 -999.990 1.139 ..P WKT 2010 09 22 09 59 55 31.3200 -97.3300 251.000 30.0 129.388 4.410 -999.990 -999.990 1.294 ..P WKT 2010 09 22 10 04 55 31.3200 -97.3300 251.000 122.0 148.178 2.140 -999.990 -999.990 1.482 ..P WKT 2010 09 22 10 09 55 31.3200 -97.3300 251.000 457.0 108.665 2.370 -999.990 -999.990 1.087 ..P WKT 2010 09 22 10 19 55 31.3200 -97.3300 251.000 30.0 121.851 1.580 -999.990 -999.990 1.219 ..P WKT 2010 09 22 10 24 55 31.3200 -97.3300 251.000 122.0 139.565 2.370 -999.990 -999.990 1.396 ..P WKT 2010 09 22 10 29 55 31.3200 -97.3300 251.000 457.0 106.211 1.970 -999.990 -999.990 1.062 ..P WKT 2010 09 22 10 34 55 31.3200 -97.3300 251.000 30.0 122.258 2.450 -999.990 -999.990 1.223 ..P WKT 2010 09 22 10 39 55 31.3200 -97.3300 251.000 122.0 109.166 1.900 -999.990 -999.990 1.092 ..P WKT 2010 09 22 10 44 55 31.3200 -97.3300 251.000 457.0 101.904 2.110 -999.990 -999.990 1.019 ..P WKT 2010 09 22 10 54 55 31.3200 -97.3300 251.000 30.0 126.379 3.910 -999.990 -999.990 1.264 ..P WKT 2010 09 22 10 59 55 31.3200 -97.3300 251.000 122.0 120.385 2.580 -999.990 -999.990 1.204 ..P WKT 2010 09 22 11 04 55 31.3200 -97.3300 251.000 457.0 105.239 1.850 -999.990 -999.990 1.052 ..P WKT 2010 09 22 11 09 55 31.3200 -97.3300 251.000 30.0 126.981 2.310 -999.990 -999.990 1.270 ..P WKT 2010 09 22 11 14 55 31.3200 -97.3300 251.000 122.0 114.333 2.210 -999.990 -999.990 1.143 ..P WKT 2010 09 22 11 19 55 31.3200 -97.3300 251.000 457.0 109.174 2.890 -999.990 -999.990 1.092 ..P WKT 2010 09 22 11 29 55 31.3200 -97.3300 251.000 30.0 132.235 2.210 -999.990 -999.990 1.322 ..P WKT 2010 09 22 11 34 55 31.3200 -97.3300 251.000 122.0 118.310 2.950 -999.990 -999.990 1.183 ..P WKT 2010 09 22 11 39 55 31.3200 -97.3300 251.000 457.0 108.824 1.880 -999.990 -999.990 1.088 ..P WKT 2010 09 22 11 44 55 31.3200 -97.3300 251.000 30.0 130.106 2.220 -999.990 -999.990 1.301 ..P WKT 2010 09 22 11 49 55 31.3200 -97.3300 251.000 122.0 115.354 1.900 -999.990 -999.990 1.154 ..P WKT 2010 09 22 12 09 55 31.3200 -97.3300 251.000 457.0 108.395 2.360 -999.990 -999.990 1.084 ..P WKT 2010 09 22 12 10 25 31.3200 -97.3300 251.000 457.0 110.876 2.910 -999.990 -999.990 1.109 ..P WKT 2010 09 22 12 10 55 31.3200 -97.3300 251.000 457.0 108.645 3.240 -999.990 -999.990 1.086 ..P WKT 2010 09 22 12 11 25 31.3200 -97.3300 251.000 457.0 115.282 2.530 -999.990 -999.990 1.153 ..P WKT 2010 09 22 12 11 55 31.3200 -97.3300 251.000 457.0 113.051 3.890 -999.990 -999.990 1.131 ..P WKT 2010 09 22 12 12 25 31.3200 -97.3300 251.000 457.0 106.664 2.080 -999.990 -999.990 1.067 ..P WKT 2010 09 22 12 12 55 31.3200 -97.3300 251.000 457.0 101.384 3.220 -999.990 -999.990 1.014 ..P WKT 2010 09 22 12 13 25 31.3200 -97.3300 251.000 457.0 108.576 4.720 -999.990 -999.990 1.086 ..P WKT 2010 09 22 12 13 55 31.3200 -97.3300 251.000 457.0 110.918 3.490 -999.990 -999.990 1.109 ..P WKT 2010 09 22 12 14 25 31.3200 -97.3300 251.000 457.0 105.500 2.690 -999.990 -999.990 1.055 ..P WKT 2010 09 22 12 14 55 31.3200 -97.3300 251.000 457.0 107.288 2.810 -999.990 -999.990 1.073 ..P WKT 2010 09 22 12 19 55 31.3200 -97.3300 251.000 30.0 144.148 2.970 -999.990 -999.990 1.441 ..P WKT 2010 09 22 12 24 55 31.3200 -97.3300 251.000 122.0 128.214 3.390 -999.990 -999.990 1.282 ..P WKT 2010 09 22 12 29 55 31.3200 -97.3300 251.000 457.0 103.273 4.400 -999.990 -999.990 1.033 ..P WKT 2010 09 22 12 34 55 31.3200 -97.3300 251.000 30.0 150.113 4.510 -999.990 -999.990 1.501 ..P WKT 2010 09 22 12 39 55 31.3200 -97.3300 251.000 122.0 123.369 5.740 -999.990 -999.990 1.234 ..P WKT 2010 09 22 12 44 55 31.3200 -97.3300 251.000 457.0 110.621 4.680 -999.990 -999.990 1.106 ..P WKT 2010 09 22 12 54 55 31.3200 -97.3300 251.000 30.0 166.317 5.520 -999.990 -999.990 1.663 ..P WKT 2010 09 22 12 59 55 31.3200 -97.3300 251.000 122.0 166.022 4.380 -999.990 -999.990 1.660 ..P WKT 2010 09 22 13 04 55 31.3200 -97.3300 251.000 457.0 108.488 4.470 -999.990 -999.990 1.085 ..P WKT 2010 09 22 13 09 55 31.3200 -97.3300 251.000 30.0 182.343 3.710 -999.990 -999.990 1.823 ..P WKT 2010 09 22 13 14 55 31.3200 -97.3300 251.000 122.0 161.259 3.640 -999.990 -999.990 1.613 ..P WKT 2010 09 22 13 19 55 31.3200 -97.3300 251.000 457.0 108.293 3.230 -999.990 -999.990 1.083 ..P WKT 2010 09 22 13 29 55 31.3200 -97.3300 251.000 30.0 158.157 2.510 -999.990 -999.990 1.582 ..P WKT 2010 09 22 13 34 55 31.3200 -97.3300 251.000 122.0 139.981 4.640 -999.990 -999.990 1.400 ..P WKT 2010 09 22 13 39 55 31.3200 -97.3300 251.000 457.0 114.734 5.300 -999.990 -999.990 1.147 ..P WKT 2010 09 22 13 44 55 31.3200 -97.3300 251.000 30.0 164.066 3.240 -999.990 -999.990 1.641 ..P WKT 2010 09 22 13 49 55 31.3200 -97.3300 251.000 122.0 155.453 5.300 -999.990 -999.990 1.555 ..P WKT 2010 09 22 13 54 55 31.3200 -97.3300 251.000 457.0 115.510 3.330 -999.990 -999.990 1.155 ..P WKT 2010 09 22 14 04 55 31.3200 -97.3300 251.000 30.0 170.453 3.190 -999.990 -999.990 1.705 ..P WKT 2010 09 22 14 09 55 31.3200 -97.3300 251.000 122.0 156.790 2.480 -999.990 -999.990 1.568 ..P WKT 2010 09 22 14 14 55 31.3200 -97.3300 251.000 457.0 115.120 2.630 -999.990 -999.990 1.151 ..P WKT 2010 09 22 14 19 55 31.3200 -97.3300 251.000 30.0 160.519 4.750 -999.990 -999.990 1.605 ..P WKT 2010 09 22 14 24 55 31.3200 -97.3300 251.000 122.0 151.014 2.900 -999.990 -999.990 1.510 ..P WKT 2010 09 22 14 29 55 31.3200 -97.3300 251.000 457.0 115.164 2.210 -999.990 -999.990 1.152 ..P WKT 2010 09 22 14 39 55 31.3200 -97.3300 251.000 30.0 152.526 2.360 -999.990 -999.990 1.525 ..P WKT 2010 09 22 14 44 55 31.3200 -97.3300 251.000 122.0 149.477 3.790 -999.990 -999.990 1.495 ..P WKT 2010 09 22 14 49 55 31.3200 -97.3300 251.000 457.0 108.434 3.460 -999.990 -999.990 1.084 ..P WKT 2010 09 22 14 54 55 31.3200 -97.3300 251.000 30.0 152.255 4.290 -999.990 -999.990 1.523 ..P WKT 2010 09 22 14 59 55 31.3200 -97.3300 251.000 122.0 150.870 3.880 -999.990 -999.990 1.509 ..P WKT 2010 09 22 15 04 55 31.3200 -97.3300 251.000 457.0 100.948 2.830 -999.990 -999.990 1.009 ..P WKT 2010 09 22 15 14 55 31.3200 -97.3300 251.000 30.0 146.597 3.490 -999.990 -999.990 1.466 ..P WKT 2010 09 22 15 19 55 31.3200 -97.3300 251.000 122.0 153.138 4.390 -999.990 -999.990 1.531 ..P WKT 2010 09 22 15 24 55 31.3200 -97.3300 251.000 457.0 100.874 4.000 -999.990 -999.990 1.009 ..P WKT 2010 09 22 15 29 55 31.3200 -97.3300 251.000 30.0 136.816 3.340 -999.990 -999.990 1.368 ..P WKT 2010 09 22 15 34 55 31.3200 -97.3300 251.000 122.0 137.393 3.110 -999.990 -999.990 1.374 ..P WKT 2010 09 22 15 39 55 31.3200 -97.3300 251.000 457.0 122.851 2.110 -999.990 -999.990 1.229 ..P WKT 2010 09 22 15 49 55 31.3200 -97.3300 251.000 30.0 121.170 3.260 -999.990 -999.990 1.212 ..P WKT 2010 09 22 15 54 55 31.3200 -97.3300 251.000 122.0 129.871 4.720 -999.990 -999.990 1.299 ..P WKT 2010 09 22 15 59 55 31.3200 -97.3300 251.000 457.0 127.613 3.870 -999.990 -999.990 1.276 ..P WKT 2010 09 22 16 04 55 31.3200 -97.3300 251.000 30.0 125.911 4.070 -999.990 -999.990 1.259 ..P WKT 2010 09 22 16 09 55 31.3200 -97.3300 251.000 122.0 127.815 5.430 -999.990 -999.990 1.278 ..P WKT 2010 09 22 16 14 55 31.3200 -97.3300 251.000 457.0 106.414 4.820 -999.990 -999.990 1.064 ..P WKT 2010 09 22 16 24 55 31.3200 -97.3300 251.000 30.0 110.042 5.120 -999.990 -999.990 1.100 ..P WKT 2010 09 22 16 29 55 31.3200 -97.3300 251.000 122.0 113.156 5.020 -999.990 -999.990 1.132 ..P WKT 2010 09 22 16 34 55 31.3200 -97.3300 251.000 457.0 113.771 4.440 -999.990 -999.990 1.138 ..P WKT 2010 09 22 16 39 55 31.3200 -97.3300 251.000 30.0 115.774 3.850 -999.990 -999.990 1.158 ..P WKT 2010 09 22 16 44 55 31.3200 -97.3300 251.000 122.0 117.500 4.270 -999.990 -999.990 1.175 ..P WKT 2010 09 22 16 49 55 31.3200 -97.3300 251.000 457.0 113.260 3.690 -999.990 -999.990 1.133 ..P WKT 2010 09 22 17 04 55 31.3200 -97.3300 251.000 30.0 114.919 3.410 -999.990 -999.990 1.149 ..P WKT 2010 09 22 17 09 55 31.3200 -97.3300 251.000 122.0 120.436 3.700 -999.990 -999.990 1.204 ..P WKT 2010 09 22 17 14 55 31.3200 -97.3300 251.000 457.0 111.661 4.060 -999.990 -999.990 1.117 ..P WKT 2010 09 22 17 19 55 31.3200 -97.3300 251.000 30.0 109.546 2.890 -999.990 -999.990 1.095 ..P WKT 2010 09 22 17 24 55 31.3200 -97.3300 251.000 122.0 115.757 2.630 -999.990 -999.990 1.158 ..P WKT 2010 09 22 17 29 55 31.3200 -97.3300 251.000 457.0 113.503 2.620 -999.990 -999.990 1.135 ..P WKT 2010 09 22 17 39 55 31.3200 -97.3300 251.000 30.0 112.916 3.070 -999.990 -999.990 1.129 ..P WKT 2010 09 22 17 44 55 31.3200 -97.3300 251.000 122.0 119.856 2.440 -999.990 -999.990 1.199 ..P WKT 2010 09 22 17 49 55 31.3200 -97.3300 251.000 457.0 111.254 3.000 -999.990 -999.990 1.113 ..P WKT 2010 09 22 17 54 55 31.3200 -97.3300 251.000 30.0 114.585 2.350 -999.990 -999.990 1.146 ..P WKT 2010 09 22 17 59 55 31.3200 -97.3300 251.000 122.0 117.363 3.510 -999.990 -999.990 1.174 ..P WKT 2010 09 22 18 04 55 31.3200 -97.3300 251.000 457.0 115.143 3.160 -999.990 -999.990 1.151 ..P WKT 2010 09 22 18 14 55 31.3200 -97.3300 251.000 30.0 111.815 3.520 -999.990 -999.990 1.118 ..P WKT 2010 09 22 18 19 55 31.3200 -97.3300 251.000 122.0 122.643 4.010 -999.990 -999.990 1.226 ..P WKT 2010 09 22 18 24 55 31.3200 -97.3300 251.000 457.0 111.540 2.540 -999.990 -999.990 1.115 ..P WKT 2010 09 22 18 29 55 31.3200 -97.3300 251.000 30.0 106.821 3.230 -999.990 -999.990 1.068 ..P WKT 2010 09 22 18 34 55 31.3200 -97.3300 251.000 122.0 111.820 3.330 -999.990 -999.990 1.118 ..P WKT 2010 09 22 18 39 55 31.3200 -97.3300 251.000 457.0 104.880 2.990 -999.990 -999.990 1.049 ..P WKT 2010 09 22 18 49 55 31.3200 -97.3300 251.000 30.0 107.024 2.980 -999.990 -999.990 1.070 ..P WKT 2010 09 22 18 54 55 31.3200 -97.3300 251.000 122.0 116.387 4.880 -999.990 -999.990 1.164 ..P WKT 2010 09 22 18 59 55 31.3200 -97.3300 251.000 457.0 111.588 4.350 -999.990 -999.990 1.116 ..P WKT 2010 09 22 19 04 55 31.3200 -97.3300 251.000 30.0 104.013 3.620 -999.990 -999.990 1.040 ..P WKT 2010 09 22 19 09 55 31.3200 -97.3300 251.000 122.0 114.209 2.040 -999.990 -999.990 1.142 ..P WKT 2010 09 22 19 14 55 31.3200 -97.3300 251.000 457.0 113.576 1.860 -999.990 -999.990 1.136 ..P WKT 2010 09 22 19 24 55 31.3200 -97.3300 251.000 30.0 108.540 1.840 -999.990 -999.990 1.085 ..P WKT 2010 09 22 19 29 55 31.3200 -97.3300 251.000 122.0 104.415 2.930 -999.990 -999.990 1.044 ..P WKT 2010 09 22 19 34 55 31.3200 -97.3300 251.000 457.0 107.511 2.100 -999.990 -999.990 1.075 ..P WKT 2010 09 22 19 39 55 31.3200 -97.3300 251.000 30.0 93.943 2.510 -999.990 -999.990 0.939 ..P WKT 2010 09 22 19 44 55 31.3200 -97.3300 251.000 122.0 102.039 3.470 -999.990 -999.990 1.020 ..P WKT 2010 09 22 19 49 55 31.3200 -97.3300 251.000 457.0 98.052 2.930 -999.990 -999.990 0.981 ..P WKT 2010 09 22 19 59 55 31.3200 -97.3300 251.000 30.0 102.617 5.120 -999.990 -999.990 1.026 ..P WKT 2010 09 22 20 04 55 31.3200 -97.3300 251.000 122.0 111.169 3.930 -999.990 -999.990 1.112 ..P WKT 2010 09 22 20 09 55 31.3200 -97.3300 251.000 457.0 104.999 3.620 -999.990 -999.990 1.050 ..P WKT 2010 09 22 20 14 55 31.3200 -97.3300 251.000 30.0 104.802 4.030 -999.990 -999.990 1.048 ..P WKT 2010 09 22 20 19 55 31.3200 -97.3300 251.000 122.0 111.410 3.560 -999.990 -999.990 1.114 ..P WKT 2010 09 22 20 24 55 31.3200 -97.3300 251.000 457.0 113.158 2.690 -999.990 -999.990 1.132 ..P WKT 2010 09 22 20 34 55 31.3200 -97.3300 251.000 30.0 110.025 3.060 -999.990 -999.990 1.100 ..P WKT 2010 09 22 20 39 55 31.3200 -97.3300 251.000 122.0 108.757 4.080 -999.990 -999.990 1.088 ..P WKT 2010 09 22 20 44 55 31.3200 -97.3300 251.000 457.0 104.988 4.750 -999.990 -999.990 1.050 ..P WKT 2010 09 22 20 49 55 31.3200 -97.3300 251.000 30.0 102.329 5.330 -999.990 -999.990 1.023 ..P WKT 2010 09 22 20 54 55 31.3200 -97.3300 251.000 122.0 102.033 4.480 -999.990 -999.990 1.020 ..P WKT 2010 09 22 20 59 55 31.3200 -97.3300 251.000 457.0 97.291 3.130 -999.990 -999.990 0.973 ..P WKT 2010 09 22 21 09 55 31.3200 -97.3300 251.000 30.0 96.162 2.940 -999.990 -999.990 0.962 ..P WKT 2010 09 22 21 14 55 31.3200 -97.3300 251.000 122.0 103.387 5.480 -999.990 -999.990 1.034 ..P WKT 2010 09 22 21 19 55 31.3200 -97.3300 251.000 457.0 105.056 5.420 -999.990 -999.990 1.051 ..P WKT 2010 09 22 21 24 55 31.3200 -97.3300 251.000 30.0 105.057 6.340 -999.990 -999.990 1.051 ..P WKT 2010 09 22 21 29 55 31.3200 -97.3300 251.000 122.0 112.421 5.490 -999.990 -999.990 1.124 ..P WKT 2010 09 22 21 34 55 31.3200 -97.3300 251.000 457.0 101.585 3.500 -999.990 -999.990 1.016 ..P WKT 2010 09 22 21 44 55 31.3200 -97.3300 251.000 30.0 97.855 4.390 -999.990 -999.990 0.979 ..P WKT 2010 09 22 21 49 55 31.3200 -97.3300 251.000 122.0 99.127 4.850 -999.990 -999.990 0.991 ..P WKT 2010 09 22 21 54 55 31.3200 -97.3300 251.000 457.0 97.897 6.250 -999.990 -999.990 0.979 ..P WKT 2010 09 22 21 59 55 31.3200 -97.3300 251.000 30.0 95.833 4.940 -999.990 -999.990 0.958 ..P WKT 2010 09 22 22 04 55 31.3200 -97.3300 251.000 122.0 99.328 4.490 -999.990 -999.990 0.993 ..P WKT 2010 09 22 22 09 55 31.3200 -97.3300 251.000 457.0 96.431 2.840 -999.990 -999.990 0.964 ..P WKT 2010 09 22 22 19 55 31.3200 -97.3300 251.000 30.0 96.194 2.810 -999.990 -999.990 0.962 ..P WKT 2010 09 22 22 24 55 31.3200 -97.3300 251.000 122.0 92.741 3.810 -999.990 -999.990 0.927 ..P WKT 2010 09 22 22 29 55 31.3200 -97.3300 251.000 457.0 94.012 4.540 -999.990 -999.990 0.940 ..P WKT 2010 09 22 22 34 55 31.3200 -97.3300 251.000 30.0 91.948 3.600 -999.990 -999.990 0.919 ..P WKT 2010 09 22 22 39 55 31.3200 -97.3300 251.000 122.0 93.220 2.810 -999.990 -999.990 0.932 ..P WKT 2010 09 22 22 44 55 31.3200 -97.3300 251.000 457.0 97.827 2.530 -999.990 -999.990 0.978 ..P WKT 2010 09 22 22 54 55 31.3200 -97.3300 251.000 30.0 97.352 2.190 -999.990 -999.990 0.974 ..P WKT 2010 09 22 22 59 55 31.3200 -97.3300 251.000 122.0 102.000 2.760 -999.990 -999.990 1.020 ..P WKT 2010 09 22 23 04 55 31.3200 -97.3300 251.000 457.0 102.755 4.270 -999.990 -999.990 1.028 ..P WKT 2010 09 22 23 09 55 31.3200 -97.3300 251.000 30.0 97.673 2.970 -999.990 -999.990 0.977 ..P WKT 2010 09 22 23 14 55 31.3200 -97.3300 251.000 122.0 99.819 4.300 -999.990 -999.990 0.998 ..P WKT 2010 09 22 23 19 55 31.3200 -97.3300 251.000 457.0 97.516 2.120 -999.990 -999.990 0.975 ..P WKT 2010 09 22 23 29 55 31.3200 -97.3300 251.000 30.0 94.328 2.850 -999.990 -999.990 0.943 ..P WKT 2010 09 22 23 34 55 31.3200 -97.3300 251.000 122.0 94.416 4.540 -999.990 -999.990 0.944 ..P WKT 2010 09 22 23 39 55 31.3200 -97.3300 251.000 457.0 96.450 2.520 -999.990 -999.990 0.965 ..P WKT 2010 09 22 23 44 55 31.3200 -97.3300 251.000 30.0 92.784 2.140 -999.990 -999.990 0.928 ..P WKT 2010 09 22 23 49 55 31.3200 -97.3300 251.000 122.0 102.882 2.610 -999.990 -999.990 1.029 ..P WKT 2010 09 23 00 09 55 31.3200 -97.3300 251.000 457.0 101.993 2.430 -999.990 -999.990 1.020 ..P WKT 2010 09 23 00 10 25 31.3200 -97.3300 251.000 457.0 95.489 3.400 -999.990 -999.990 0.955 ..P WKT 2010 09 23 00 10 55 31.3200 -97.3300 251.000 457.0 95.101 2.270 -999.990 -999.990 0.951 ..P WKT 2010 09 23 00 11 25 31.3200 -97.3300 251.000 457.0 97.494 3.430 -999.990 -999.990 0.975 ..P WKT 2010 09 23 00 11 55 31.3200 -97.3300 251.000 457.0 103.084 1.840 -999.990 -999.990 1.031 ..P WKT 2010 09 23 00 12 25 31.3200 -97.3300 251.000 457.0 96.441 4.120 -999.990 -999.990 0.964 ..P WKT 2010 09 23 00 12 55 31.3200 -97.3300 251.000 457.0 97.999 3.010 -999.990 -999.990 0.980 ..P WKT 2010 09 23 00 13 25 31.3200 -97.3300 251.000 457.0 99.419 1.840 -999.990 -999.990 0.994 ..P WKT 2010 09 23 00 13 55 31.3200 -97.3300 251.000 457.0 102.506 2.430 -999.990 -999.990 1.025 ..P WKT 2010 09 23 00 14 25 31.3200 -97.3300 251.000 457.0 96.836 2.450 -999.990 -999.990 0.968 ..P WKT 2010 09 23 00 14 55 31.3200 -97.3300 251.000 457.0 97.838 2.660 -999.990 -999.990 0.978 ..P WKT 2010 09 23 00 19 55 31.3200 -97.3300 251.000 30.0 101.328 2.160 -999.990 -999.990 1.013 ..P WKT 2010 09 23 00 24 55 31.3200 -97.3300 251.000 122.0 105.652 2.470 -999.990 -999.990 1.057 ..P WKT 2010 09 23 00 29 55 31.3200 -97.3300 251.000 457.0 95.661 3.410 -999.990 -999.990 0.957 ..P WKT 2010 09 23 00 34 55 31.3200 -97.3300 251.000 30.0 98.039 1.780 -999.990 -999.990 0.980 ..P WKT 2010 09 23 00 39 55 31.3200 -97.3300 251.000 122.0 96.526 2.960 -999.990 -999.990 0.965 ..P WKT 2010 09 23 00 44 55 31.3200 -97.3300 251.000 457.0 101.543 2.700 -999.990 -999.990 1.015 ..P WKT 2010 09 23 00 54 55 31.3200 -97.3300 251.000 30.0 103.928 5.850 -999.990 -999.990 1.039 ..P WKT 2010 09 23 00 59 55 31.3200 -97.3300 251.000 122.0 110.881 3.130 -999.990 -999.990 1.109 ..P WKT 2010 09 23 01 04 55 31.3200 -97.3300 251.000 457.0 100.890 3.320 -999.990 -999.990 1.009 ..P WKT 2010 09 23 01 09 55 31.3200 -97.3300 251.000 30.0 103.258 3.980 -999.990 -999.990 1.033 ..P WKT 2010 09 23 01 14 55 31.3200 -97.3300 251.000 122.0 101.740 4.530 -999.990 -999.990 1.017 ..P WKT 2010 09 23 01 19 55 31.3200 -97.3300 251.000 457.0 100.082 4.750 -999.990 -999.990 1.001 ..P WKT 2010 09 23 01 29 55 31.3200 -97.3300 251.000 30.0 95.835 5.120 -999.990 -999.990 0.958 ..P WKT 2010 09 23 01 34 55 31.3200 -97.3300 251.000 122.0 101.714 5.110 -999.990 -999.990 1.017 ..P WKT 2010 09 23 01 39 55 31.3200 -97.3300 251.000 457.0 93.435 4.790 -999.990 -999.990 0.934 ..P WKT 2010 09 23 01 44 55 31.3200 -97.3300 251.000 30.0 99.589 5.040 -999.990 -999.990 0.996 ..P WKT 2010 09 23 01 49 55 31.3200 -97.3300 251.000 122.0 104.079 4.570 -999.990 -999.990 1.041 ..P WKT 2010 09 23 01 54 55 31.3200 -97.3300 251.000 457.0 94.137 5.120 -999.990 -999.990 0.941 ..P WKT 2010 09 23 02 04 55 31.3200 -97.3300 251.000 30.0 96.930 4.210 -999.990 -999.990 0.969 ..P WKT 2010 09 23 02 09 55 31.3200 -97.3300 251.000 122.0 99.673 3.730 -999.990 -999.990 0.997 ..P WKT 2010 09 23 02 14 55 31.3200 -97.3300 251.000 457.0 97.977 3.860 -999.990 -999.990 0.980 ..P WKT 2010 09 23 02 19 55 31.3200 -97.3300 251.000 30.0 92.122 3.280 -999.990 -999.990 0.921 ..P WKT 2010 09 23 02 24 55 31.3200 -97.3300 251.000 122.0 95.420 3.010 -999.990 -999.990 0.954 ..P WKT 2010 09 23 02 29 55 31.3200 -97.3300 251.000 457.0 92.893 2.790 -999.990 -999.990 0.929 ..P WKT 2010 09 23 02 39 55 31.3200 -97.3300 251.000 30.0 89.148 2.600 -999.990 -999.990 0.891 ..P WKT 2010 09 23 02 44 55 31.3200 -97.3300 251.000 122.0 98.466 2.650 -999.990 -999.990 0.985 ..P WKT 2010 09 23 02 49 55 31.3200 -97.3300 251.000 457.0 116.098 3.350 -999.990 -999.990 1.161 ..P WKT 2010 09 23 02 54 55 31.3200 -97.3300 251.000 30.0 98.246 3.570 -999.990 -999.990 0.982 ..P WKT 2010 09 23 02 59 55 31.3200 -97.3300 251.000 122.0 104.234 3.270 -999.990 -999.990 1.042 ..P WKT 2010 09 23 03 04 55 31.3200 -97.3300 251.000 457.0 98.858 2.780 -999.990 -999.990 0.989 ..P WKT 2010 09 23 03 14 55 31.3200 -97.3300 251.000 30.0 95.233 2.930 -999.990 -999.990 0.952 ..P WKT 2010 09 23 03 19 55 31.3200 -97.3300 251.000 122.0 101.140 3.020 -999.990 -999.990 1.011 ..P WKT 2010 09 23 03 24 55 31.3200 -97.3300 251.000 457.0 95.133 2.770 -999.990 -999.990 0.951 ..P WKT 2010 09 23 03 29 55 31.3200 -97.3300 251.000 30.0 94.390 3.500 -999.990 -999.990 0.944 ..P WKT 2010 09 23 03 34 55 31.3200 -97.3300 251.000 122.0 104.866 3.350 -999.990 -999.990 1.049 ..P WKT 2010 09 23 03 39 55 31.3200 -97.3300 251.000 457.0 88.335 2.800 -999.990 -999.990 0.883 ..P WKT 2010 09 23 03 49 55 31.3200 -97.3300 251.000 30.0 96.444 3.800 -999.990 -999.990 0.964 ..P WKT 2010 09 23 03 54 55 31.3200 -97.3300 251.000 122.0 107.787 2.840 -999.990 -999.990 1.078 ..P WKT 2010 09 23 03 59 55 31.3200 -97.3300 251.000 457.0 87.978 4.690 -999.990 -999.990 0.880 ..P WKT 2010 09 23 04 04 55 31.3200 -97.3300 251.000 30.0 95.028 3.300 -999.990 -999.990 0.950 ..P WKT 2010 09 23 04 09 55 31.3200 -97.3300 251.000 122.0 93.771 4.050 -999.990 -999.990 0.938 ..P WKT 2010 09 23 04 14 55 31.3200 -97.3300 251.000 457.0 91.824 4.260 -999.990 -999.990 0.918 ..P WKT 2010 09 23 04 24 55 31.3200 -97.3300 251.000 30.0 93.839 2.820 -999.990 -999.990 0.938 ..P WKT 2010 09 23 04 29 55 31.3200 -97.3300 251.000 122.0 104.028 2.700 -999.990 -999.990 1.040 ..P WKT 2010 09 23 04 34 55 31.3200 -97.3300 251.000 457.0 92.632 2.970 -999.990 -999.990 0.926 ..P WKT 2010 09 23 04 39 55 31.3200 -97.3300 251.000 30.0 95.210 3.130 -999.990 -999.990 0.952 ..P WKT 2010 09 23 04 44 55 31.3200 -97.3300 251.000 122.0 103.736 4.330 -999.990 -999.990 1.037 ..P WKT 2010 09 23 04 49 55 31.3200 -97.3300 251.000 457.0 96.493 3.040 -999.990 -999.990 0.965 ..P WKT 2010 09 23 05 04 55 31.3200 -97.3300 251.000 30.0 94.792 3.130 -999.990 -999.990 0.948 ..P WKT 2010 09 23 05 09 55 31.3200 -97.3300 251.000 122.0 101.571 2.910 -999.990 -999.990 1.016 ..P WKT 2010 09 23 05 14 55 31.3200 -97.3300 251.000 457.0 96.460 3.530 -999.990 -999.990 0.965 ..P WKT 2010 09 23 05 19 55 31.3200 -97.3300 251.000 30.0 93.561 3.030 -999.990 -999.990 0.936 ..P WKT 2010 09 23 05 24 55 31.3200 -97.3300 251.000 122.0 99.785 3.180 -999.990 -999.990 0.998 ..P WKT 2010 09 23 05 29 55 31.3200 -97.3300 251.000 457.0 89.700 3.230 -999.990 -999.990 0.897 ..P WKT 2010 09 23 05 39 55 31.3200 -97.3300 251.000 30.0 94.867 4.100 -999.990 -999.990 0.949 ..P WKT 2010 09 23 05 44 55 31.3200 -97.3300 251.000 122.0 100.719 3.520 -999.990 -999.990 1.007 ..P WKT 2010 09 23 05 49 55 31.3200 -97.3300 251.000 457.0 91.372 3.110 -999.990 -999.990 0.914 ..P WKT 2010 09 23 05 54 55 31.3200 -97.3300 251.000 30.0 96.670 3.890 -999.990 -999.990 0.967 ..P WKT 2010 09 23 05 59 55 31.3200 -97.3300 251.000 122.0 103.349 3.410 -999.990 -999.990 1.033 ..P WKT 2010 09 23 06 04 55 31.3200 -97.3300 251.000 457.0 101.463 4.680 -999.990 -999.990 1.015 ..P WKT 2010 09 23 06 14 55 31.3200 -97.3300 251.000 30.0 102.467 4.800 -999.990 -999.990 1.025 ..P WKT 2010 09 23 06 19 55 31.3200 -97.3300 251.000 122.0 100.385 4.760 -999.990 -999.990 1.004 ..P WKT 2010 09 23 06 24 55 31.3200 -97.3300 251.000 457.0 88.914 4.330 -999.990 -999.990 0.889 ..P WKT 2010 09 23 06 29 55 31.3200 -97.3300 251.000 30.0 94.840 5.170 -999.990 -999.990 0.948 ..P WKT 2010 09 23 06 34 55 31.3200 -97.3300 251.000 122.0 98.557 4.130 -999.990 -999.990 0.986 ..P WKT 2010 09 23 06 39 55 31.3200 -97.3300 251.000 457.0 88.194 4.310 -999.990 -999.990 0.882 ..P WKT 2010 09 23 06 49 55 31.3200 -97.3300 251.000 30.0 92.867 4.370 -999.990 -999.990 0.929 ..P WKT 2010 09 23 06 54 55 31.3200 -97.3300 251.000 122.0 102.653 4.320 -999.990 -999.990 1.027 ..P WKT 2010 09 23 06 59 55 31.3200 -97.3300 251.000 457.0 93.398 4.700 -999.990 -999.990 0.934 ..P WKT 2010 09 23 07 04 55 31.3200 -97.3300 251.000 30.0 95.733 3.880 -999.990 -999.990 0.957 ..P WKT 2010 09 23 07 09 55 31.3200 -97.3300 251.000 122.0 101.102 3.590 -999.990 -999.990 1.011 ..P WKT 2010 09 23 07 14 55 31.3200 -97.3300 251.000 457.0 97.642 3.570 -999.990 -999.990 0.976 ..P WKT 2010 09 23 07 24 55 31.3200 -97.3300 251.000 30.0 98.094 3.360 -999.990 -999.990 0.981 ..P WKT 2010 09 23 07 29 55 31.3200 -97.3300 251.000 122.0 99.797 3.230 -999.990 -999.990 0.998 ..P WKT 2010 09 23 07 34 55 31.3200 -97.3300 251.000 457.0 81.231 3.780 -999.990 -999.990 0.812 ..P WKT 2010 09 23 07 39 55 31.3200 -97.3300 251.000 30.0 94.379 4.260 -999.990 -999.990 0.944 ..P WKT 2010 09 23 07 44 55 31.3200 -97.3300 251.000 122.0 102.147 3.310 -999.990 -999.990 1.021 ..P WKT 2010 09 23 07 49 55 31.3200 -97.3300 251.000 457.0 89.376 3.540 -999.990 -999.990 0.894 ..P WKT 2010 09 23 07 59 55 31.3200 -97.3300 251.000 30.0 101.227 3.790 -999.990 -999.990 1.012 ..P WKT 2010 09 23 08 04 55 31.3200 -97.3300 251.000 122.0 96.354 4.430 -999.990 -999.990 0.964 ..P WKT 2010 09 23 08 09 55 31.3200 -97.3300 251.000 457.0 93.272 3.690 -999.990 -999.990 0.933 ..P WKT 2010 09 23 08 14 55 31.3200 -97.3300 251.000 30.0 96.943 3.920 -999.990 -999.990 0.969 ..P WKT 2010 09 23 08 19 55 31.3200 -97.3300 251.000 122.0 102.128 4.150 -999.990 -999.990 1.021 ..P WKT 2010 09 23 08 24 55 31.3200 -97.3300 251.000 457.0 86.511 4.480 -999.990 -999.990 0.865 ..P WKT 2010 09 23 08 34 55 31.3200 -97.3300 251.000 30.0 101.446 4.900 -999.990 -999.990 1.014 ..P WKT 2010 09 23 08 39 55 31.3200 -97.3300 251.000 122.0 94.254 4.530 -999.990 -999.990 0.943 ..P WKT 2010 09 23 08 44 55 31.3200 -97.3300 251.000 457.0 82.795 4.120 -999.990 -999.990 0.828 ..P WKT 2010 09 23 08 49 55 31.3200 -97.3300 251.000 30.0 98.462 4.140 -999.990 -999.990 0.985 ..P WKT 2010 09 23 08 54 55 31.3200 -97.3300 251.000 122.0 94.439 5.220 -999.990 -999.990 0.944 ..P WKT 2010 09 23 08 59 55 31.3200 -97.3300 251.000 457.0 87.113 5.430 -999.990 -999.990 0.871 ..P WKT 2010 09 23 09 09 55 31.3200 -97.3300 251.000 30.0 103.727 4.290 -999.990 -999.990 1.037 ..P WKT 2010 09 23 09 14 55 31.3200 -97.3300 251.000 122.0 105.781 3.850 -999.990 -999.990 1.058 ..P WKT 2010 09 23 09 19 55 31.3200 -97.3300 251.000 457.0 91.733 3.570 -999.990 -999.990 0.917 ..P WKT 2010 09 23 09 24 55 31.3200 -97.3300 251.000 30.0 103.557 3.650 -999.990 -999.990 1.036 ..P WKT 2010 09 23 09 29 55 31.3200 -97.3300 251.000 122.0 106.847 3.550 -999.990 -999.990 1.068 ..P WKT 2010 09 23 09 34 55 31.3200 -97.3300 251.000 457.0 85.100 3.840 -999.990 -999.990 0.851 ..P WKT 2010 09 23 09 44 55 31.3200 -97.3300 251.000 30.0 98.069 5.960 -999.990 -999.990 0.981 ..P WKT 2010 09 23 09 49 55 31.3200 -97.3300 251.000 122.0 109.944 4.500 -999.990 -999.990 1.099 ..P WKT 2010 09 23 09 54 55 31.3200 -97.3300 251.000 457.0 91.839 3.530 -999.990 -999.990 0.918 ..P WKT 2010 09 23 09 59 55 31.3200 -97.3300 251.000 30.0 102.339 3.570 -999.990 -999.990 1.023 ..P WKT 2010 09 23 10 04 55 31.3200 -97.3300 251.000 122.0 115.586 3.830 -999.990 -999.990 1.156 ..P WKT 2010 09 23 10 09 55 31.3200 -97.3300 251.000 457.0 90.061 4.940 -999.990 -999.990 0.901 ..P WKT 2010 09 23 10 19 55 31.3200 -97.3300 251.000 30.0 105.672 4.240 -999.990 -999.990 1.057 ..P WKT 2010 09 23 10 24 55 31.3200 -97.3300 251.000 122.0 116.557 4.120 -999.990 -999.990 1.166 ..P WKT 2010 09 23 10 29 55 31.3200 -97.3300 251.000 457.0 87.312 3.750 -999.990 -999.990 0.873 ..P WKT 2010 09 23 10 34 55 31.3200 -97.3300 251.000 30.0 107.267 3.950 -999.990 -999.990 1.073 ..P WKT 2010 09 23 10 39 55 31.3200 -97.3300 251.000 122.0 100.562 3.890 -999.990 -999.990 1.006 ..P WKT 2010 09 23 10 44 55 31.3200 -97.3300 251.000 457.0 84.516 4.240 -999.990 -999.990 0.845 ..P WKT 2010 09 23 10 54 55 31.3200 -97.3300 251.000 30.0 100.510 4.330 -999.990 -999.990 1.005 ..P WKT 2010 09 23 10 59 55 31.3200 -97.3300 251.000 122.0 109.466 4.860 -999.990 -999.990 1.095 ..P WKT 2010 09 23 11 04 55 31.3200 -97.3300 251.000 457.0 86.696 4.380 -999.990 -999.990 0.867 ..P WKT 2010 09 23 11 09 55 31.3200 -97.3300 251.000 30.0 103.891 5.270 -999.990 -999.990 1.039 ..P WKT 2010 09 23 11 14 55 31.3200 -97.3300 251.000 122.0 112.844 4.850 -999.990 -999.990 1.128 ..P WKT 2010 09 23 11 19 55 31.3200 -97.3300 251.000 457.0 86.511 5.310 -999.990 -999.990 0.865 ..P WKT 2010 09 23 11 29 55 31.3200 -97.3300 251.000 30.0 104.528 5.350 -999.990 -999.990 1.045 ..P WKT 2010 09 23 11 34 55 31.3200 -97.3300 251.000 122.0 104.943 5.270 -999.990 -999.990 1.049 ..P WKT 2010 09 23 11 39 55 31.3200 -97.3300 251.000 457.0 85.184 5.310 -999.990 -999.990 0.852 ..P WKT 2010 09 23 11 44 55 31.3200 -97.3300 251.000 30.0 104.813 5.080 -999.990 -999.990 1.048 ..P WKT 2010 09 23 11 49 55 31.3200 -97.3300 251.000 122.0 97.818 5.330 -999.990 -999.990 0.978 ..P WKT 2010 09 23 12 09 55 31.3200 -97.3300 251.000 457.0 92.607 4.570 -999.990 -999.990 0.926 ..P WKT 2010 09 23 12 10 25 31.3200 -97.3300 251.000 457.0 86.821 4.650 -999.990 -999.990 0.868 ..P WKT 2010 09 23 12 10 55 31.3200 -97.3300 251.000 457.0 89.952 5.560 -999.990 -999.990 0.900 ..P WKT 2010 09 23 12 11 25 31.3200 -97.3300 251.000 457.0 90.340 6.000 -999.990 -999.990 0.903 ..P WKT 2010 09 23 12 11 55 31.3200 -97.3300 251.000 457.0 86.886 4.710 -999.990 -999.990 0.869 ..P WKT 2010 09 23 12 12 25 31.3200 -97.3300 251.000 457.0 92.076 4.360 -999.990 -999.990 0.921 ..P WKT 2010 09 23 12 12 55 31.3200 -97.3300 251.000 457.0 92.052 5.120 -999.990 -999.990 0.921 ..P WKT 2010 09 23 12 13 25 31.3200 -97.3300 251.000 457.0 98.201 4.620 -999.990 -999.990 0.982 ..P WKT 2010 09 23 12 13 55 31.3200 -97.3300 251.000 457.0 97.217 5.010 -999.990 -999.990 0.972 ..P WKT 2010 09 23 12 14 25 31.3200 -97.3300 251.000 457.0 99.388 4.590 -999.990 -999.990 0.994 ..P WKT 2010 09 23 12 14 55 31.3200 -97.3300 251.000 457.0 96.208 4.480 -999.990 -999.990 0.962 ..P WKT 2010 09 23 12 19 55 31.3200 -97.3300 251.000 30.0 99.262 4.190 -999.990 -999.990 0.993 ..P WKT 2010 09 23 12 24 55 31.3200 -97.3300 251.000 122.0 97.652 4.310 -999.990 -999.990 0.977 ..P WKT 2010 09 23 12 29 55 31.3200 -97.3300 251.000 457.0 98.236 4.710 -999.990 -999.990 0.982 ..P WKT 2010 09 23 12 34 55 31.3200 -97.3300 251.000 30.0 99.094 4.140 -999.990 -999.990 0.991 ..P WKT 2010 09 23 12 39 55 31.3200 -97.3300 251.000 122.0 100.090 3.930 -999.990 -999.990 1.001 ..P WKT 2010 09 23 12 44 55 31.3200 -97.3300 251.000 457.0 91.482 4.280 -999.990 -999.990 0.915 ..P WKT 2010 09 23 12 54 55 31.3200 -97.3300 251.000 30.0 102.925 3.790 -999.990 -999.990 1.029 ..P WKT 2010 09 23 12 59 55 31.3200 -97.3300 251.000 122.0 104.042 3.960 -999.990 -999.990 1.040 ..P WKT 2010 09 23 13 04 55 31.3200 -97.3300 251.000 457.0 98.300 3.770 -999.990 -999.990 0.983 ..P WKT 2010 09 23 13 09 55 31.3200 -97.3300 251.000 30.0 100.104 4.840 -999.990 -999.990 1.001 ..P WKT 2010 09 23 13 14 55 31.3200 -97.3300 251.000 122.0 110.964 4.030 -999.990 -999.990 1.110 ..P WKT 2010 09 23 13 19 55 31.3200 -97.3300 251.000 457.0 104.261 4.490 -999.990 -999.990 1.043 ..P WKT 2010 09 23 13 29 55 31.3200 -97.3300 251.000 30.0 104.478 3.980 -999.990 -999.990 1.045 ..P WKT 2010 09 23 13 34 55 31.3200 -97.3300 251.000 122.0 102.068 4.550 -999.990 -999.990 1.021 ..P WKT 2010 09 23 13 39 55 31.3200 -97.3300 251.000 457.0 91.151 4.440 -999.990 -999.990 0.912 ..P WKT 2010 09 23 13 44 55 31.3200 -97.3300 251.000 30.0 101.912 4.390 -999.990 -999.990 1.019 ..P WKT 2010 09 23 13 49 55 31.3200 -97.3300 251.000 122.0 101.423 4.630 -999.990 -999.990 1.014 ..P WKT 2010 09 23 13 54 55 31.3200 -97.3300 251.000 457.0 91.329 6.130 -999.990 -999.990 0.913 ..P WKT 2010 09 23 14 04 55 31.3200 -97.3300 251.000 30.0 105.248 4.790 -999.990 -999.990 1.052 ..P WKT 2010 09 23 14 09 55 31.3200 -97.3300 251.000 122.0 113.618 4.500 -999.990 -999.990 1.136 ..P WKT 2010 09 23 14 14 55 31.3200 -97.3300 251.000 457.0 104.974 4.480 -999.990 -999.990 1.050 ..P WKT 2010 09 23 14 19 55 31.3200 -97.3300 251.000 30.0 105.662 4.230 -999.990 -999.990 1.057 ..P WKT 2010 09 23 14 24 55 31.3200 -97.3300 251.000 122.0 107.171 4.340 -999.990 -999.990 1.072 ..P WKT 2010 09 23 14 29 55 31.3200 -97.3300 251.000 457.0 97.978 4.150 -999.990 -999.990 0.980 ..P WKT 2010 09 23 14 39 55 31.3200 -97.3300 251.000 30.0 99.724 3.860 -999.990 -999.990 0.997 ..P WKT 2010 09 23 14 44 55 31.3200 -97.3300 251.000 122.0 107.370 4.250 -999.990 -999.990 1.074 ..P WKT 2010 09 23 14 49 55 31.3200 -97.3300 251.000 457.0 93.335 3.650 -999.990 -999.990 0.933 ..P WKT 2010 09 23 14 54 55 31.3200 -97.3300 251.000 30.0 100.707 4.350 -999.990 -999.990 1.007 ..P WKT 2010 09 23 14 59 55 31.3200 -97.3300 251.000 122.0 113.568 3.470 -999.990 -999.990 1.136 ..P WKT 2010 09 23 15 04 55 31.3200 -97.3300 251.000 457.0 100.905 4.810 -999.990 -999.990 1.009 ..P WKT 2010 09 23 15 14 55 31.3200 -97.3300 251.000 30.0 111.884 4.140 -999.990 -999.990 1.119 ..P WKT 2010 09 23 15 19 55 31.3200 -97.3300 251.000 122.0 112.747 3.740 -999.990 -999.990 1.127 ..P WKT 2010 09 23 15 24 55 31.3200 -97.3300 251.000 457.0 105.102 3.630 -999.990 -999.990 1.051 ..P WKT 2010 09 23 15 29 55 31.3200 -97.3300 251.000 30.0 106.651 4.080 -999.990 -999.990 1.067 ..P WKT 2010 09 23 15 34 55 31.3200 -97.3300 251.000 122.0 108.750 3.790 -999.990 -999.990 1.088 ..P WKT 2010 09 23 15 39 55 31.3200 -97.3300 251.000 457.0 101.928 3.960 -999.990 -999.990 1.019 ..P WKT 2010 09 23 15 49 55 31.3200 -97.3300 251.000 30.0 104.302 4.440 -999.990 -999.990 1.043 ..P WKT 2010 09 23 15 54 55 31.3200 -97.3300 251.000 122.0 112.400 5.020 -999.990 -999.990 1.124 ..P WKT 2010 09 23 15 59 55 31.3200 -97.3300 251.000 457.0 93.598 3.890 -999.990 -999.990 0.936 ..P WKT 2010 09 23 16 04 55 31.3200 -97.3300 251.000 30.0 102.932 4.190 -999.990 -999.990 1.029 ..P WKT 2010 09 23 16 09 55 31.3200 -97.3300 251.000 122.0 103.070 4.260 -999.990 -999.990 1.031 ..P WKT 2010 09 23 16 14 55 31.3200 -97.3300 251.000 457.0 97.993 3.880 -999.990 -999.990 0.980 ..P WKT 2010 09 23 16 24 55 31.3200 -97.3300 251.000 30.0 99.366 3.770 -999.990 -999.990 0.994 ..P WKT 2010 09 23 16 29 55 31.3200 -97.3300 251.000 122.0 100.465 3.950 -999.990 -999.990 1.005 ..P WKT 2010 09 23 16 34 55 31.3200 -97.3300 251.000 457.0 99.368 4.510 -999.990 -999.990 0.994 ..P WKT 2010 09 23 16 39 55 31.3200 -97.3300 251.000 30.0 84.820 4.280 -999.990 -999.990 0.848 ..P WKT 2010 09 23 16 44 55 31.3200 -97.3300 251.000 122.0 97.036 4.550 -999.990 -999.990 0.970 ..P WKT 2010 09 23 16 49 55 31.3200 -97.3300 251.000 457.0 88.527 3.910 -999.990 -999.990 0.885 ..P WKT 2010 09 23 17 04 55 31.3200 -97.3300 251.000 30.0 95.156 4.100 -999.990 -999.990 0.952 ..P WKT 2010 09 23 17 09 55 31.3200 -97.3300 251.000 122.0 97.922 4.190 -999.990 -999.990 0.979 ..P WKT 2010 09 23 17 14 55 31.3200 -97.3300 251.000 457.0 89.432 4.450 -999.990 -999.990 0.894 ..P WKT 2010 09 23 17 19 55 31.3200 -97.3300 251.000 30.0 94.394 4.050 -999.990 -999.990 0.944 ..P WKT 2010 09 23 17 24 55 31.3200 -97.3300 251.000 122.0 102.375 3.650 -999.990 -999.990 1.024 ..P WKT 2010 09 23 17 29 55 31.3200 -97.3300 251.000 457.0 94.160 4.090 -999.990 -999.990 0.942 ..P WKT 2010 09 23 17 39 55 31.3200 -97.3300 251.000 30.0 85.768 4.360 -999.990 -999.990 0.858 ..P WKT 2010 09 23 17 44 55 31.3200 -97.3300 251.000 122.0 95.476 3.270 -999.990 -999.990 0.955 ..P WKT 2010 09 23 17 49 55 31.3200 -97.3300 251.000 457.0 92.280 3.410 -999.990 -999.990 0.923 ..P WKT 2010 09 23 17 54 55 31.3200 -97.3300 251.000 30.0 92.105 3.470 -999.990 -999.990 0.921 ..P WKT 2010 09 23 17 59 55 31.3200 -97.3300 251.000 122.0 95.497 3.570 -999.990 -999.990 0.955 ..P WKT 2010 09 23 18 04 55 31.3200 -97.3300 251.000 457.0 93.949 2.900 -999.990 -999.990 0.939 ..P WKT 2010 09 23 18 14 55 31.3200 -97.3300 251.000 30.0 93.597 3.010 -999.990 -999.990 0.936 ..P WKT 2010 09 23 18 19 55 31.3200 -97.3300 251.000 122.0 97.265 3.890 -999.990 -999.990 0.973 ..P WKT 2010 09 23 18 24 55 31.3200 -97.3300 251.000 457.0 100.659 3.950 -999.990 -999.990 1.007 ..P WKT 2010 09 23 18 29 55 31.3200 -97.3300 251.000 30.0 91.149 4.610 -999.990 -999.990 0.911 ..P WKT 2010 09 23 18 34 55 31.3200 -97.3300 251.000 122.0 104.151 4.220 -999.990 -999.990 1.042 ..P WKT 2010 09 23 18 39 55 31.3200 -97.3300 251.000 457.0 91.347 4.650 -999.990 -999.990 0.913 ..P WKT 2010 09 23 18 49 55 31.3200 -97.3300 251.000 30.0 96.917 5.050 -999.990 -999.990 0.969 ..P WKT 2010 09 23 18 54 55 31.3200 -97.3300 251.000 122.0 102.938 5.240 -999.990 -999.990 1.029 ..P WKT 2010 09 23 18 59 55 31.3200 -97.3300 251.000 457.0 99.351 5.420 -999.990 -999.990 0.994 ..P WKT 2010 09 23 19 04 55 31.3200 -97.3300 251.000 30.0 90.409 5.950 -999.990 -999.990 0.904 ..P WKT 2010 09 23 19 09 55 31.3200 -97.3300 251.000 122.0 94.371 5.000 -999.990 -999.990 0.944 ..P WKT 2010 09 23 19 14 55 31.3200 -97.3300 251.000 457.0 89.822 3.690 -999.990 -999.990 0.898 ..P WKT 2010 09 23 19 24 55 31.3200 -97.3300 251.000 30.0 92.550 4.960 -999.990 -999.990 0.925 ..P WKT 2010 09 23 19 29 55 31.3200 -97.3300 251.000 122.0 96.119 5.570 -999.990 -999.990 0.961 ..P WKT 2010 09 23 19 34 55 31.3200 -97.3300 251.000 457.0 88.844 6.220 -999.990 -999.990 0.888 ..P WKT 2010 09 23 19 39 55 31.3200 -97.3300 251.000 30.0 90.081 5.650 -999.990 -999.990 0.901 ..P WKT 2010 09 23 19 44 55 31.3200 -97.3300 251.000 122.0 94.748 4.240 -999.990 -999.990 0.947 ..P WKT 2010 09 23 19 49 55 31.3200 -97.3300 251.000 457.0 91.042 7.460 -999.990 -999.990 0.910 ..P WKT 2010 09 23 19 59 55 31.3200 -97.3300 251.000 30.0 99.556 4.280 -999.990 -999.990 0.996 ..P WKT 2010 09 23 20 04 55 31.3200 -97.3300 251.000 122.0 103.813 4.230 -999.990 -999.990 1.038 ..P WKT 2010 09 23 20 09 55 31.3200 -97.3300 251.000 457.0 101.205 4.550 -999.990 -999.990 1.012 ..P WKT 2010 09 23 20 14 55 31.3200 -97.3300 251.000 30.0 95.303 4.490 -999.990 -999.990 0.953 ..P WKT 2010 09 23 20 19 55 31.3200 -97.3300 251.000 122.0 101.207 3.970 -999.990 -999.990 1.012 ..P WKT 2010 09 23 20 24 55 31.3200 -97.3300 251.000 457.0 98.050 3.290 -999.990 -999.990 0.981 ..P WKT 2010 09 23 20 34 55 31.3200 -97.3300 251.000 30.0 92.717 3.120 -999.990 -999.990 0.927 ..P WKT 2010 09 23 20 39 55 31.3200 -97.3300 251.000 122.0 96.032 2.850 -999.990 -999.990 0.960 ..P WKT 2010 09 23 20 44 55 31.3200 -97.3300 251.000 457.0 90.149 3.250 -999.990 -999.990 0.901 ..P WKT 2010 09 23 20 49 55 31.3200 -97.3300 251.000 30.0 92.229 2.830 -999.990 -999.990 0.922 ..P WKT 2010 09 23 20 54 55 31.3200 -97.3300 251.000 122.0 99.251 4.370 -999.990 -999.990 0.993 ..P WKT 2010 09 23 20 59 55 31.3200 -97.3300 251.000 457.0 92.544 3.350 -999.990 -999.990 0.925 ..P WKT 2010 09 23 21 09 55 31.3200 -97.3300 251.000 30.0 96.625 2.370 -999.990 -999.990 0.966 ..P WKT 2010 09 23 21 14 55 31.3200 -97.3300 251.000 122.0 104.531 3.230 -999.990 -999.990 1.045 ..P WKT 2010 09 23 21 19 55 31.3200 -97.3300 251.000 457.0 102.276 2.400 -999.990 -999.990 1.023 ..P WKT 2010 09 23 21 24 55 31.3200 -97.3300 251.000 30.0 104.415 4.480 -999.990 -999.990 1.044 ..P WKT 2010 09 23 21 29 55 31.3200 -97.3300 251.000 122.0 107.652 3.010 -999.990 -999.990 1.077 ..P WKT 2010 09 23 21 34 55 31.3200 -97.3300 251.000 457.0 103.474 2.520 -999.990 -999.990 1.035 ..P WKT 2010 09 23 21 44 55 31.3200 -97.3300 251.000 30.0 95.042 2.460 -999.990 -999.990 0.950 ..P WKT 2010 09 23 21 49 55 31.3200 -97.3300 251.000 122.0 96.004 3.150 -999.990 -999.990 0.960 ..P WKT 2010 09 23 21 54 55 31.3200 -97.3300 251.000 457.0 92.572 2.970 -999.990 -999.990 0.926 ..P WKT 2010 09 23 21 59 55 31.3200 -97.3300 251.000 30.0 92.435 3.440 -999.990 -999.990 0.924 ..P WKT 2010 09 23 22 04 55 31.3200 -97.3300 251.000 122.0 96.968 2.570 -999.990 -999.990 0.970 ..P WKT 2010 09 23 22 09 55 31.3200 -97.3300 251.000 457.0 99.303 2.260 -999.990 -999.990 0.993 ..P WKT 2010 09 23 22 19 55 31.3200 -97.3300 251.000 30.0 99.972 2.480 -999.990 -999.990 1.000 ..P WKT 2010 09 23 22 24 55 31.3200 -97.3300 251.000 122.0 104.072 2.890 -999.990 -999.990 1.041 ..P WKT 2010 09 23 22 29 55 31.3200 -97.3300 251.000 457.0 99.934 3.430 -999.990 -999.990 0.999 ..P WKT 2010 09 23 22 34 55 31.3200 -97.3300 251.000 30.0 99.366 3.230 -999.990 -999.990 0.994 ..P WKT 2010 09 23 22 39 55 31.3200 -97.3300 251.000 122.0 100.721 3.130 -999.990 -999.990 1.007 ..P WKT 2010 09 23 22 44 55 31.3200 -97.3300 251.000 457.0 103.723 3.310 -999.990 -999.990 1.037 ..P WKT 2010 09 23 22 54 55 31.3200 -97.3300 251.000 30.0 93.759 3.820 -999.990 -999.990 0.938 ..P WKT 2010 09 23 22 59 55 31.3200 -97.3300 251.000 122.0 97.821 3.440 -999.990 -999.990 0.978 ..P WKT 2010 09 23 23 04 55 31.3200 -97.3300 251.000 457.0 94.192 3.450 -999.990 -999.990 0.942 ..P WKT 2010 09 23 23 09 55 31.3200 -97.3300 251.000 30.0 100.588 2.620 -999.990 -999.990 1.006 ..P WKT 2010 09 23 23 14 55 31.3200 -97.3300 251.000 122.0 106.710 2.640 -999.990 -999.990 1.067 ..P WKT 2010 09 23 23 19 55 31.3200 -97.3300 251.000 457.0 99.649 2.420 -999.990 -999.990 0.996 ..P WKT 2010 09 23 23 29 55 31.3200 -97.3300 251.000 30.0 99.474 2.080 -999.990 -999.990 0.995 ..P WKT 2010 09 23 23 34 55 31.3200 -97.3300 251.000 122.0 101.279 2.680 -999.990 -999.990 1.013 ..P WKT 2010 09 23 23 39 55 31.3200 -97.3300 251.000 457.0 98.553 3.380 -999.990 -999.990 0.986 ..P WKT 2010 09 23 23 44 55 31.3200 -97.3300 251.000 30.0 103.105 3.360 -999.990 -999.990 1.031 ..P WKT 2010 09 23 23 49 55 31.3200 -97.3300 251.000 122.0 102.164 3.310 -999.990 -999.990 1.022 ..P WKT 2010 09 24 00 09 55 31.3200 -97.3300 251.000 457.0 106.882 2.110 -999.990 -999.990 1.069 ..P WKT 2010 09 24 00 10 25 31.3200 -97.3300 251.000 457.0 110.361 2.620 -999.990 -999.990 1.104 ..P WKT 2010 09 24 00 10 55 31.3200 -97.3300 251.000 457.0 108.623 2.620 -999.990 -999.990 1.086 ..P WKT 2010 09 24 00 11 25 31.3200 -97.3300 251.000 457.0 107.297 2.330 -999.990 -999.990 1.073 ..P WKT 2010 09 24 00 11 55 31.3200 -97.3300 251.000 457.0 112.149 2.800 -999.990 -999.990 1.121 ..P WKT 2010 09 24 00 12 25 31.3200 -97.3300 251.000 457.0 108.077 2.980 -999.990 -999.990 1.081 ..P WKT 2010 09 24 00 12 55 31.3200 -97.3300 251.000 457.0 108.810 2.500 -999.990 -999.990 1.088 ..P WKT 2010 09 24 00 13 25 31.3200 -97.3300 251.000 457.0 108.720 2.370 -999.990 -999.990 1.087 ..P WKT 2010 09 24 00 13 55 31.3200 -97.3300 251.000 457.0 111.787 2.870 -999.990 -999.990 1.118 ..P WKT 2010 09 24 00 14 25 31.3200 -97.3300 251.000 457.0 108.951 2.890 -999.990 -999.990 1.090 ..P WKT 2010 09 24 00 14 55 31.3200 -97.3300 251.000 457.0 113.940 3.320 -999.990 -999.990 1.139 ..P WKT 2010 09 24 00 19 55 31.3200 -97.3300 251.000 30.0 111.799 3.660 -999.990 -999.990 1.118 ..P WKT 2010 09 24 00 24 55 31.3200 -97.3300 251.000 122.0 115.288 3.300 -999.990 -999.990 1.153 ..P WKT 2010 09 24 00 29 55 31.3200 -97.3300 251.000 457.0 101.343 3.150 -999.990 -999.990 1.013 ..P WKT 2010 09 24 00 34 55 31.3200 -97.3300 251.000 30.0 104.145 2.550 -999.990 -999.990 1.041 ..P WKT 2010 09 24 00 39 55 31.3200 -97.3300 251.000 122.0 103.653 2.620 -999.990 -999.990 1.037 ..P WKT 2010 09 24 00 44 55 31.3200 -97.3300 251.000 457.0 103.573 2.360 -999.990 -999.990 1.036 ..P WKT 2010 09 24 00 54 55 31.3200 -97.3300 251.000 30.0 100.142 2.630 -999.990 -999.990 1.001 ..P WKT 2010 09 24 00 59 55 31.3200 -97.3300 251.000 122.0 111.881 2.960 -999.990 -999.990 1.119 ..P WKT 2010 09 24 01 04 55 31.3200 -97.3300 251.000 457.0 96.732 3.350 -999.990 -999.990 0.967 ..P WKT 2010 09 24 01 09 55 31.3200 -97.3300 251.000 30.0 110.116 4.600 -999.990 -999.990 1.101 ..P WKT 2010 09 24 01 14 55 31.3200 -97.3300 251.000 122.0 116.366 4.010 -999.990 -999.990 1.164 ..P WKT 2010 09 24 01 19 55 31.3200 -97.3300 251.000 457.0 99.576 6.330 -999.990 -999.990 0.996 ..P WKT 2010 09 24 01 29 55 31.3200 -97.3300 251.000 30.0 109.919 4.440 -999.990 -999.990 1.099 ..P WKT 2010 09 24 01 34 55 31.3200 -97.3300 251.000 122.0 103.044 4.020 -999.990 -999.990 1.030 ..P WKT 2010 09 24 01 39 55 31.3200 -97.3300 251.000 457.0 92.606 4.610 -999.990 -999.990 0.926 ..P WKT 2010 09 24 01 44 55 31.3200 -97.3300 251.000 30.0 108.488 5.880 -999.990 -999.990 1.085 ..P WKT 2010 09 24 01 49 55 31.3200 -97.3300 251.000 122.0 103.535 4.890 -999.990 -999.990 1.035 ..P WKT 2010 09 24 01 54 55 31.3200 -97.3300 251.000 457.0 89.810 3.150 -999.990 -999.990 0.898 ..P WKT 2010 09 24 02 04 55 31.3200 -97.3300 251.000 30.0 107.195 4.500 -999.990 -999.990 1.072 ..P WKT 2010 09 24 02 09 55 31.3200 -97.3300 251.000 122.0 110.347 5.030 -999.990 -999.990 1.103 ..P WKT 2010 09 24 02 14 55 31.3200 -97.3300 251.000 457.0 94.865 5.910 -999.990 -999.990 0.949 ..P WKT 2010 09 24 02 19 55 31.3200 -97.3300 251.000 30.0 111.716 4.780 -999.990 -999.990 1.117 ..P WKT 2010 09 24 02 24 55 31.3200 -97.3300 251.000 122.0 109.113 3.770 -999.990 -999.990 1.091 ..P WKT 2010 09 24 02 29 55 31.3200 -97.3300 251.000 457.0 100.210 4.340 -999.990 -999.990 1.002 ..P WKT 2010 09 24 02 39 55 31.3200 -97.3300 251.000 30.0 102.853 4.160 -999.990 -999.990 1.029 ..P WKT 2010 09 24 02 44 55 31.3200 -97.3300 251.000 122.0 108.369 3.840 -999.990 -999.990 1.084 ..P WKT 2010 09 24 02 49 55 31.3200 -97.3300 251.000 457.0 95.127 4.650 -999.990 -999.990 0.951 ..P WKT 2010 09 24 02 54 55 31.3200 -97.3300 251.000 30.0 106.119 4.370 -999.990 -999.990 1.061 ..P WKT 2010 09 24 02 59 55 31.3200 -97.3300 251.000 122.0 123.407 3.650 -999.990 -999.990 1.234 ..P WKT 2010 09 24 03 04 55 31.3200 -97.3300 251.000 457.0 96.753 2.890 -999.990 -999.990 0.968 ..P WKT 2010 09 24 03 14 55 31.3200 -97.3300 251.000 30.0 110.323 3.150 -999.990 -999.990 1.103 ..P WKT 2010 09 24 03 19 55 31.3200 -97.3300 251.000 122.0 107.703 3.470 -999.990 -999.990 1.077 ..P WKT 2010 09 24 03 24 55 31.3200 -97.3300 251.000 457.0 96.053 3.800 -999.990 -999.990 0.961 ..P WKT 2010 09 24 03 29 55 31.3200 -97.3300 251.000 30.0 104.790 3.110 -999.990 -999.990 1.048 ..P WKT 2010 09 24 03 34 55 31.3200 -97.3300 251.000 122.0 101.214 2.920 -999.990 -999.990 1.012 ..P WKT 2010 09 24 03 39 55 31.3200 -97.3300 251.000 457.0 91.346 3.320 -999.990 -999.990 0.913 ..P WKT 2010 09 24 03 49 55 31.3200 -97.3300 251.000 30.0 105.534 2.950 -999.990 -999.990 1.055 ..P WKT 2010 09 24 03 54 55 31.3200 -97.3300 251.000 122.0 105.514 3.540 -999.990 -999.990 1.055 ..P WKT 2010 09 24 03 59 55 31.3200 -97.3300 251.000 457.0 88.539 3.430 -999.990 -999.990 0.885 ..P WKT 2010 09 24 04 04 55 31.3200 -97.3300 251.000 30.0 102.740 4.400 -999.990 -999.990 1.027 ..P WKT 2010 09 24 04 09 55 31.3200 -97.3300 251.000 122.0 96.980 3.820 -999.990 -999.990 0.970 ..P WKT 2010 09 24 04 14 55 31.3200 -97.3300 251.000 457.0 87.255 4.170 -999.990 -999.990 0.873 ..P WKT 2010 09 24 04 24 55 31.3200 -97.3300 251.000 30.0 95.263 4.020 -999.990 -999.990 0.953 ..P WKT 2010 09 24 04 29 55 31.3200 -97.3300 251.000 122.0 92.902 4.250 -999.990 -999.990 0.929 ..P WKT 2010 09 24 04 34 55 31.3200 -97.3300 251.000 457.0 83.845 4.210 -999.990 -999.990 0.838 ..P WKT 2010 09 24 04 39 55 31.3200 -97.3300 251.000 30.0 96.379 3.600 -999.990 -999.990 0.964 ..P WKT 2010 09 24 04 44 55 31.3200 -97.3300 251.000 122.0 100.440 3.340 -999.990 -999.990 1.004 ..P WKT 2010 09 24 04 49 55 31.3200 -97.3300 251.000 457.0 85.373 3.670 -999.990 -999.990 0.854 ..P WKT 2010 09 24 05 04 55 31.3200 -97.3300 251.000 30.0 103.671 3.660 -999.990 -999.990 1.037 ..P WKT 2010 09 24 05 09 55 31.3200 -97.3300 251.000 122.0 102.730 3.250 -999.990 -999.990 1.027 ..P WKT 2010 09 24 05 14 55 31.3200 -97.3300 251.000 457.0 96.600 3.100 -999.990 -999.990 0.966 ..P WKT 2010 09 24 05 19 55 31.3200 -97.3300 251.000 30.0 104.125 4.130 -999.990 -999.990 1.041 ..P WKT 2010 09 24 05 24 55 31.3200 -97.3300 251.000 122.0 99.634 2.770 -999.990 -999.990 0.996 ..P WKT 2010 09 24 05 29 55 31.3200 -97.3300 251.000 457.0 88.318 4.840 -999.990 -999.990 0.883 ..P WKT 2010 09 24 05 39 55 31.3200 -97.3300 251.000 30.0 92.899 2.590 -999.990 -999.990 0.929 ..P WKT 2010 09 24 05 44 55 31.3200 -97.3300 251.000 122.0 97.872 3.140 -999.990 -999.990 0.979 ..P WKT 2010 09 24 05 49 55 31.3200 -97.3300 251.000 457.0 93.837 2.540 -999.990 -999.990 0.938 ..P WKT 2010 09 24 05 54 55 31.3200 -97.3300 251.000 30.0 89.803 2.960 -999.990 -999.990 0.898 ..P WKT 2010 09 24 05 59 55 31.3200 -97.3300 251.000 122.0 98.869 5.050 -999.990 -999.990 0.989 ..P WKT 2010 09 24 06 04 55 31.3200 -97.3300 251.000 457.0 91.560 2.870 -999.990 -999.990 0.916 ..P WKT 2010 09 24 06 14 55 31.3200 -97.3300 251.000 30.0 98.403 2.810 -999.990 -999.990 0.984 ..P WKT 2010 09 24 06 19 55 31.3200 -97.3300 251.000 122.0 96.455 3.950 -999.990 -999.990 0.965 ..P WKT 2010 09 24 06 24 55 31.3200 -97.3300 251.000 457.0 89.325 3.090 -999.990 -999.990 0.893 ..P WKT 2010 09 24 06 29 55 31.3200 -97.3300 251.000 30.0 94.743 3.260 -999.990 -999.990 0.947 ..P WKT 2010 09 24 06 34 55 31.3200 -97.3300 251.000 122.0 98.387 2.710 -999.990 -999.990 0.984 ..P WKT 2010 09 24 06 39 55 31.3200 -97.3300 251.000 457.0 88.531 3.340 -999.990 -999.990 0.885 ..P WKT 2010 09 24 06 49 55 31.3200 -97.3300 251.000 30.0 99.791 3.610 -999.990 -999.990 0.998 ..P WKT 2010 09 24 06 54 55 31.3200 -97.3300 251.000 122.0 101.136 3.320 -999.990 -999.990 1.011 ..P WKT 2010 09 24 06 59 55 31.3200 -97.3300 251.000 457.0 92.666 3.570 -999.990 -999.990 0.927 ..P WKT 2010 09 24 07 04 55 31.3200 -97.3300 251.000 30.0 101.506 3.060 -999.990 -999.990 1.015 ..P WKT 2010 09 24 07 09 55 31.3200 -97.3300 251.000 122.0 104.213 3.980 -999.990 -999.990 1.042 ..P WKT 2010 09 24 07 14 55 31.3200 -97.3300 251.000 457.0 90.703 4.670 -999.990 -999.990 0.907 ..P WKT 2010 09 24 07 24 55 31.3200 -97.3300 251.000 30.0 99.075 4.270 -999.990 -999.990 0.991 ..P WKT 2010 09 24 07 29 55 31.3200 -97.3300 251.000 122.0 101.197 3.950 -999.990 -999.990 1.012 ..P WKT 2010 09 24 07 34 55 31.3200 -97.3300 251.000 457.0 84.112 4.000 -999.990 -999.990 0.841 ..P WKT 2010 09 24 07 39 55 31.3200 -97.3300 251.000 30.0 97.268 4.180 -999.990 -999.990 0.973 ..P WKT 2010 09 24 07 44 55 31.3200 -97.3300 251.000 122.0 98.164 4.300 -999.990 -999.990 0.982 ..P WKT 2010 09 24 07 49 55 31.3200 -97.3300 251.000 457.0 97.562 4.470 -999.990 -999.990 0.976 ..P WKT 2010 09 24 07 59 55 31.3200 -97.3300 251.000 30.0 102.679 4.220 -999.990 -999.990 1.027 ..P WKT 2010 09 24 08 04 55 31.3200 -97.3300 251.000 122.0 101.181 4.290 -999.990 -999.990 1.012 ..P WKT 2010 09 24 08 09 55 31.3200 -97.3300 251.000 457.0 90.292 3.900 -999.990 -999.990 0.903 ..P WKT 2010 09 24 08 14 55 31.3200 -97.3300 251.000 30.0 94.785 3.880 -999.990 -999.990 0.948 ..P WKT 2010 09 24 08 19 55 31.3200 -97.3300 251.000 122.0 105.811 3.890 -999.990 -999.990 1.058 ..P WKT 2010 09 24 08 24 55 31.3200 -97.3300 251.000 457.0 89.071 3.850 -999.990 -999.990 0.891 ..P WKT 2010 09 24 08 34 55 31.3200 -97.3300 251.000 30.0 102.837 2.870 -999.990 -999.990 1.028 ..P WKT 2010 09 24 08 39 55 31.3200 -97.3300 251.000 122.0 105.306 3.250 -999.990 -999.990 1.053 ..P WKT 2010 09 24 08 44 55 31.3200 -97.3300 251.000 457.0 95.802 4.060 -999.990 -999.990 0.958 ..P WKT 2010 09 24 08 49 55 31.3200 -97.3300 251.000 30.0 102.896 4.790 -999.990 -999.990 1.029 ..P WKT 2010 09 24 08 54 55 31.3200 -97.3300 251.000 122.0 98.563 4.220 -999.990 -999.990 0.986 ..P WKT 2010 09 24 08 59 55 31.3200 -97.3300 251.000 457.0 95.047 3.500 -999.990 -999.990 0.950 ..P WKT 2010 09 24 09 09 55 31.3200 -97.3300 251.000 30.0 104.918 3.140 -999.990 -999.990 1.049 ..P WKT 2010 09 24 09 14 55 31.3200 -97.3300 251.000 122.0 103.616 4.970 -999.990 -999.990 1.036 ..P WKT 2010 09 24 09 19 55 31.3200 -97.3300 251.000 457.0 95.789 5.570 -999.990 -999.990 0.958 ..P WKT 2010 09 24 09 24 55 31.3200 -97.3300 251.000 30.0 90.410 6.900 -999.990 -999.990 0.904 ..P WKT 2010 09 24 09 29 55 31.3200 -97.3300 251.000 122.0 101.618 6.210 -999.990 -999.990 1.016 ..P WKT 2010 09 24 09 34 55 31.3200 -97.3300 251.000 457.0 84.549 4.260 -999.990 -999.990 0.845 ..P WKT 2010 09 24 09 44 55 31.3200 -97.3300 251.000 30.0 86.455 4.000 -999.990 -999.990 0.865 ..P WKT 2010 09 24 09 49 55 31.3200 -97.3300 251.000 122.0 95.911 7.020 -999.990 -999.990 0.959 ..P WKT 2010 09 24 09 54 55 31.3200 -97.3300 251.000 457.0 81.995 7.010 -999.990 -999.990 0.820 ..P WKT 2010 09 24 09 59 55 31.3200 -97.3300 251.000 30.0 93.080 6.340 -999.990 -999.990 0.931 ..P WKT 2010 09 24 10 04 55 31.3200 -97.3300 251.000 122.0 104.163 3.450 -999.990 -999.990 1.042 ..P WKT 2010 09 24 10 09 55 31.3200 -97.3300 251.000 457.0 88.075 3.350 -999.990 -999.990 0.881 ..P WKT 2010 09 24 10 19 55 31.3200 -97.3300 251.000 30.0 100.651 3.390 -999.990 -999.990 1.007 ..P WKT 2010 09 24 10 24 55 31.3200 -97.3300 251.000 122.0 107.307 3.930 -999.990 -999.990 1.073 ..P WKT 2010 09 24 10 29 55 31.3200 -97.3300 251.000 457.0 89.517 4.200 -999.990 -999.990 0.895 ..P WKT 2010 09 24 10 34 55 31.3200 -97.3300 251.000 30.0 99.024 3.830 -999.990 -999.990 0.990 ..P WKT 2010 09 24 10 39 55 31.3200 -97.3300 251.000 122.0 105.949 3.430 -999.990 -999.990 1.059 ..P WKT 2010 09 24 10 44 55 31.3200 -97.3300 251.000 457.0 82.327 4.060 -999.990 -999.990 0.823 ..P WKT 2010 09 24 10 54 55 31.3200 -97.3300 251.000 30.0 107.656 2.560 -999.990 -999.990 1.077 ..P WKT 2010 09 24 10 59 55 31.3200 -97.3300 251.000 122.0 105.833 3.320 -999.990 -999.990 1.058 ..P WKT 2010 09 24 11 04 55 31.3200 -97.3300 251.000 457.0 88.675 2.850 -999.990 -999.990 0.887 ..P WKT 2010 09 24 11 09 55 31.3200 -97.3300 251.000 30.0 100.289 3.340 -999.990 -999.990 1.003 ..P WKT 2010 09 24 11 14 55 31.3200 -97.3300 251.000 122.0 105.794 2.970 -999.990 -999.990 1.058 ..P WKT 2010 09 24 11 19 55 31.3200 -97.3300 251.000 457.0 84.435 2.900 -999.990 -999.990 0.844 ..P WKT 2010 09 24 11 29 55 31.3200 -97.3300 251.000 30.0 90.856 2.950 -999.990 -999.990 0.909 ..P WKT 2010 09 24 11 34 55 31.3200 -97.3300 251.000 122.0 100.859 2.870 -999.990 -999.990 1.009 ..P WKT 2010 09 24 11 39 55 31.3200 -97.3300 251.000 457.0 78.716 3.590 -999.990 -999.990 0.787 ..P WKT 2010 09 24 11 44 55 31.3200 -97.3300 251.000 30.0 93.057 4.080 -999.990 -999.990 0.931 ..P WKT 2010 09 24 11 49 55 31.3200 -97.3300 251.000 122.0 97.361 4.060 -999.990 -999.990 0.974 ..P WKT 2010 09 24 12 09 55 31.3200 -97.3300 251.000 457.0 90.446 2.790 -999.990 -999.990 0.904 ..P WKT 2010 09 24 12 10 25 31.3200 -97.3300 251.000 457.0 86.739 3.810 -999.990 -999.990 0.867 ..P WKT 2010 09 24 12 10 55 31.3200 -97.3300 251.000 457.0 83.439 3.210 -999.990 -999.990 0.834 ..P WKT 2010 09 24 12 11 25 31.3200 -97.3300 251.000 457.0 86.241 4.790 -999.990 -999.990 0.862 ..P WKT 2010 09 24 12 11 55 31.3200 -97.3300 251.000 457.0 95.146 2.970 -999.990 -999.990 0.951 ..P WKT 2010 09 24 12 12 25 31.3200 -97.3300 251.000 457.0 93.608 3.590 -999.990 -999.990 0.936 ..P WKT 2010 09 24 12 12 55 31.3200 -97.3300 251.000 457.0 88.545 3.330 -999.990 -999.990 0.885 ..P WKT 2010 09 24 12 13 25 31.3200 -97.3300 251.000 457.0 88.228 3.790 -999.990 -999.990 0.882 ..P WKT 2010 09 24 12 13 55 31.3200 -97.3300 251.000 457.0 87.911 3.130 -999.990 -999.990 0.879 ..P WKT 2010 09 24 12 14 25 31.3200 -97.3300 251.000 457.0 87.866 3.160 -999.990 -999.990 0.879 ..P WKT 2010 09 24 12 14 55 31.3200 -97.3300 251.000 457.0 88.227 3.610 -999.990 -999.990 0.882 ..P WKT 2010 09 24 12 19 55 31.3200 -97.3300 251.000 30.0 97.400 4.050 -999.990 -999.990 0.974 ..P WKT 2010 09 24 12 24 55 31.3200 -97.3300 251.000 122.0 97.216 3.590 -999.990 -999.990 0.972 ..P WKT 2010 09 24 12 29 55 31.3200 -97.3300 251.000 457.0 85.366 4.340 -999.990 -999.990 0.854 ..P WKT 2010 09 24 12 34 55 31.3200 -97.3300 251.000 30.0 98.204 4.050 -999.990 -999.990 0.982 ..P WKT 2010 09 24 12 39 55 31.3200 -97.3300 251.000 122.0 101.276 4.230 -999.990 -999.990 1.013 ..P WKT 2010 09 24 12 44 55 31.3200 -97.3300 251.000 457.0 81.554 2.960 -999.990 -999.990 0.816 ..P WKT 2010 09 24 12 54 55 31.3200 -97.3300 251.000 30.0 95.438 4.520 -999.990 -999.990 0.954 ..P WKT 2010 09 24 12 59 55 31.3200 -97.3300 251.000 122.0 100.010 4.350 -999.990 -999.990 1.000 ..P WKT 2010 09 24 13 04 55 31.3200 -97.3300 251.000 457.0 90.467 3.020 -999.990 -999.990 0.905 ..P WKT 2010 09 24 13 09 55 31.3200 -97.3300 251.000 30.0 101.827 3.510 -999.990 -999.990 1.018 ..P WKT 2010 09 24 13 14 55 31.3200 -97.3300 251.000 122.0 102.871 2.980 -999.990 -999.990 1.029 ..P WKT 2010 09 24 13 19 55 31.3200 -97.3300 251.000 457.0 87.623 3.160 -999.990 -999.990 0.876 ..P WKT 2010 09 24 13 29 55 31.3200 -97.3300 251.000 30.0 95.840 3.190 -999.990 -999.990 0.958 ..P WKT 2010 09 24 13 34 55 31.3200 -97.3300 251.000 122.0 101.385 4.570 -999.990 -999.990 1.014 ..P WKT 2010 09 24 13 39 55 31.3200 -97.3300 251.000 457.0 82.484 3.400 -999.990 -999.990 0.825 ..P WKT 2010 09 24 13 44 55 31.3200 -97.3300 251.000 30.0 96.994 4.680 -999.990 -999.990 0.970 ..P WKT 2010 09 24 13 49 55 31.3200 -97.3300 251.000 122.0 96.564 3.710 -999.990 -999.990 0.966 ..P WKT 2010 09 24 13 54 55 31.3200 -97.3300 251.000 457.0 84.450 2.950 -999.990 -999.990 0.845 ..P WKT 2010 09 24 14 04 55 31.3200 -97.3300 251.000 30.0 102.997 3.030 -999.990 -999.990 1.030 ..P WKT 2010 09 24 14 09 55 31.3200 -97.3300 251.000 122.0 104.315 4.610 -999.990 -999.990 1.043 ..P WKT 2010 09 24 14 14 55 31.3200 -97.3300 251.000 457.0 90.412 4.140 -999.990 -999.990 0.904 ..P WKT 2010 09 24 14 19 55 31.3200 -97.3300 251.000 30.0 102.872 4.940 -999.990 -999.990 1.029 ..P WKT 2010 09 24 14 24 55 31.3200 -97.3300 251.000 122.0 106.364 4.320 -999.990 -999.990 1.064 ..P WKT 2010 09 24 14 29 55 31.3200 -97.3300 251.000 457.0 88.652 3.840 -999.990 -999.990 0.887 ..P WKT 2010 09 24 14 39 55 31.3200 -97.3300 251.000 30.0 102.259 3.490 -999.990 -999.990 1.023 ..P WKT 2010 09 24 14 44 55 31.3200 -97.3300 251.000 122.0 103.266 4.870 -999.990 -999.990 1.033 ..P WKT 2010 09 24 14 49 55 31.3200 -97.3300 251.000 457.0 91.899 7.000 -999.990 -999.990 0.919 ..P WKT 2010 09 24 14 54 55 31.3200 -97.3300 251.000 30.0 90.457 9.110 -999.990 -999.990 0.905 ..P WKT 2010 09 24 14 59 55 31.3200 -97.3300 251.000 122.0 98.264 7.700 -999.990 -999.990 0.983 ..P WKT 2010 09 24 15 04 55 31.3200 -97.3300 251.000 457.0 85.125 5.440 -999.990 -999.990 0.851 ..P WKT 2010 09 24 15 14 55 31.3200 -97.3300 251.000 30.0 89.936 5.590 -999.990 -999.990 0.899 ..P WKT 2010 09 24 15 19 55 31.3200 -97.3300 251.000 122.0 96.463 7.990 -999.990 -999.990 0.965 ..P WKT 2010 09 24 15 24 55 31.3200 -97.3300 251.000 457.0 94.827 9.400 -999.990 -999.990 0.948 ..P WKT 2010 09 24 15 29 55 31.3200 -97.3300 251.000 30.0 89.924 7.300 -999.990 -999.990 0.899 ..P WKT 2010 09 24 15 34 55 31.3200 -97.3300 251.000 122.0 97.542 4.640 -999.990 -999.990 0.975 ..P WKT 2010 09 24 15 39 55 31.3200 -97.3300 251.000 457.0 91.550 4.420 -999.990 -999.990 0.915 ..P WKT 2010 09 24 15 49 55 31.3200 -97.3300 251.000 30.0 92.864 3.970 -999.990 -999.990 0.929 ..P WKT 2010 09 24 15 54 55 31.3200 -97.3300 251.000 122.0 93.910 3.890 -999.990 -999.990 0.939 ..P WKT 2010 09 24 15 59 55 31.3200 -97.3300 251.000 457.0 84.474 4.170 -999.990 -999.990 0.845 ..P WKT 2010 09 24 16 04 55 31.3200 -97.3300 251.000 30.0 85.111 6.110 -999.990 -999.990 0.851 ..P WKT 2010 09 24 16 09 55 31.3200 -97.3300 251.000 122.0 96.098 3.800 -999.990 -999.990 0.961 ..P WKT 2010 09 24 16 14 55 31.3200 -97.3300 251.000 457.0 86.250 3.670 -999.990 -999.990 0.863 ..P WKT 2010 09 24 16 24 55 31.3200 -97.3300 251.000 30.0 82.058 4.100 -999.990 -999.990 0.821 ..P WKT 2010 09 24 16 29 55 31.3200 -97.3300 251.000 122.0 92.348 3.490 -999.990 -999.990 0.923 ..P WKT 2010 09 24 16 34 55 31.3200 -97.3300 251.000 457.0 88.471 3.590 -999.990 -999.990 0.885 ..P WKT 2010 09 24 16 39 55 31.3200 -97.3300 251.000 30.0 78.871 4.080 -999.990 -999.990 0.789 ..P WKT 2010 09 24 16 44 55 31.3200 -97.3300 251.000 122.0 88.618 4.840 -999.990 -999.990 0.886 ..P WKT 2010 09 24 16 49 55 31.3200 -97.3300 251.000 457.0 79.835 4.530 -999.990 -999.990 0.798 ..P WKT 2010 09 24 17 04 55 31.3200 -97.3300 251.000 30.0 84.533 5.050 -999.990 -999.990 0.845 ..P WKT 2010 09 24 17 09 55 31.3200 -97.3300 251.000 122.0 91.412 5.060 -999.990 -999.990 0.914 ..P WKT 2010 09 24 17 14 55 31.3200 -97.3300 251.000 457.0 84.660 5.590 -999.990 -999.990 0.847 ..P WKT 2010 09 24 17 19 55 31.3200 -97.3300 251.000 30.0 77.362 5.850 -999.990 -999.990 0.774 ..P WKT 2010 09 24 17 24 55 31.3200 -97.3300 251.000 122.0 83.969 5.100 -999.990 -999.990 0.840 ..P WKT 2010 09 24 17 29 55 31.3200 -97.3300 251.000 457.0 81.579 3.880 -999.990 -999.990 0.816 ..P WKT 2010 09 24 17 39 55 31.3200 -97.3300 251.000 30.0 84.209 4.200 -999.990 -999.990 0.842 ..P WKT 2010 09 24 17 44 55 31.3200 -97.3300 251.000 122.0 93.324 5.190 -999.990 -999.990 0.933 ..P WKT 2010 09 24 17 49 55 31.3200 -97.3300 251.000 457.0 81.706 6.880 -999.990 -999.990 0.817 ..P WKT 2010 09 24 17 54 55 31.3200 -97.3300 251.000 30.0 81.272 6.090 -999.990 -999.990 0.813 ..P WKT 2010 09 24 17 59 55 31.3200 -97.3300 251.000 122.0 89.297 4.060 -999.990 -999.990 0.893 ..P WKT 2010 09 24 18 04 55 31.3200 -97.3300 251.000 457.0 90.229 3.590 -999.990 -999.990 0.902 ..P WKT 2010 09 24 18 14 55 31.3200 -97.3300 251.000 30.0 93.028 3.990 -999.990 -999.990 0.930 ..P WKT 2010 09 24 18 19 55 31.3200 -97.3300 251.000 122.0 95.988 3.880 -999.990 -999.990 0.960 ..P WKT 2010 09 24 18 24 55 31.3200 -97.3300 251.000 457.0 91.851 5.850 -999.990 -999.990 0.919 ..P WKT 2010 09 24 18 29 55 31.3200 -97.3300 251.000 30.0 90.580 5.820 -999.990 -999.990 0.906 ..P WKT 2010 09 24 18 34 55 31.3200 -97.3300 251.000 122.0 96.953 5.230 -999.990 -999.990 0.970 ..P WKT 2010 09 24 18 39 55 31.3200 -97.3300 251.000 457.0 88.173 4.780 -999.990 -999.990 0.882 ..P WKT 2010 09 24 18 49 55 31.3200 -97.3300 251.000 30.0 89.160 4.240 -999.990 -999.990 0.892 ..P WKT 2010 09 24 18 54 55 31.3200 -97.3300 251.000 122.0 98.657 5.310 -999.990 -999.990 0.987 ..P WKT 2010 09 24 18 59 55 31.3200 -97.3300 251.000 457.0 88.352 6.400 -999.990 -999.990 0.884 ..P WKT 2010 09 24 19 04 55 31.3200 -97.3300 251.000 30.0 92.933 5.510 -999.990 -999.990 0.929 ..P WKT 2010 09 24 19 09 55 31.3200 -97.3300 251.000 122.0 104.071 5.190 -999.990 -999.990 1.041 ..P WKT 2010 09 24 19 14 55 31.3200 -97.3300 251.000 457.0 89.666 5.360 -999.990 -999.990 0.897 ..P WKT 2010 09 24 19 24 55 31.3200 -97.3300 251.000 30.0 87.667 5.030 -999.990 -999.990 0.877 ..P WKT 2010 09 24 19 29 55 31.3200 -97.3300 251.000 122.0 96.389 4.850 -999.990 -999.990 0.964 ..P WKT 2010 09 24 19 34 55 31.3200 -97.3300 251.000 457.0 92.949 5.650 -999.990 -999.990 0.929 ..P WKT 2010 09 24 19 39 55 31.3200 -97.3300 251.000 30.0 85.410 4.970 -999.990 -999.990 0.854 ..P WKT 2010 09 24 19 44 55 31.3200 -97.3300 251.000 122.0 90.307 4.520 -999.990 -999.990 0.903 ..P WKT 2010 09 24 19 49 55 31.3200 -97.3300 251.000 457.0 94.110 4.990 -999.990 -999.990 0.941 ..P WKT 2010 09 24 19 59 55 31.3200 -97.3300 251.000 30.0 92.561 4.600 -999.990 -999.990 0.926 ..P WKT 2010 09 24 20 04 55 31.3200 -97.3300 251.000 122.0 102.381 4.550 -999.990 -999.990 1.024 ..P WKT 2010 09 24 20 09 55 31.3200 -97.3300 251.000 457.0 95.112 4.610 -999.990 -999.990 0.951 ..P WKT 2010 09 24 20 14 55 31.3200 -97.3300 251.000 30.0 95.088 4.260 -999.990 -999.990 0.951 ..P WKT 2010 09 24 20 19 55 31.3200 -97.3300 251.000 122.0 108.058 4.030 -999.990 -999.990 1.081 ..P WKT 2010 09 24 20 24 55 31.3200 -97.3300 251.000 457.0 97.231 3.890 -999.990 -999.990 0.972 ..P WKT 2010 09 24 20 34 55 31.3200 -97.3300 251.000 30.0 83.387 3.980 -999.990 -999.990 0.834 ..P WKT 2010 09 24 20 39 55 31.3200 -97.3300 251.000 122.0 90.771 3.810 -999.990 -999.990 0.908 ..P WKT 2010 09 24 20 44 55 31.3200 -97.3300 251.000 457.0 88.851 3.910 -999.990 -999.990 0.889 ..P WKT 2010 09 24 20 49 55 31.3200 -97.3300 251.000 30.0 82.827 4.120 -999.990 -999.990 0.828 ..P WKT 2010 09 24 20 54 55 31.3200 -97.3300 251.000 122.0 88.296 4.220 -999.990 -999.990 0.883 ..P WKT 2010 09 24 20 59 55 31.3200 -97.3300 251.000 457.0 88.018 4.120 -999.990 -999.990 0.880 ..P WKT 2010 09 24 21 09 55 31.3200 -97.3300 251.000 30.0 87.424 5.780 -999.990 -999.990 0.874 ..P WKT 2010 09 24 21 14 55 31.3200 -97.3300 251.000 122.0 92.856 4.540 -999.990 -999.990 0.929 ..P WKT 2010 09 24 21 19 55 31.3200 -97.3300 251.000 457.0 87.611 4.080 -999.990 -999.990 0.876 ..P WKT 2010 09 24 21 24 55 31.3200 -97.3300 251.000 30.0 89.758 4.030 -999.990 -999.990 0.898 ..P WKT 2010 09 24 21 29 55 31.3200 -97.3300 251.000 122.0 92.728 3.860 -999.990 -999.990 0.927 ..P WKT 2010 09 24 21 34 55 31.3200 -97.3300 251.000 457.0 97.067 3.930 -999.990 -999.990 0.971 ..P WKT 2010 09 24 21 44 55 31.3200 -97.3300 251.000 30.0 90.721 4.870 -999.990 -999.990 0.907 ..P WKT 2010 09 24 21 49 55 31.3200 -97.3300 251.000 122.0 87.429 4.730 -999.990 -999.990 0.874 ..P WKT 2010 09 24 21 54 55 31.3200 -97.3300 251.000 457.0 91.809 4.480 -999.990 -999.990 0.918 ..P WKT 2010 09 24 21 59 55 31.3200 -97.3300 251.000 30.0 84.407 4.600 -999.990 -999.990 0.844 ..P WKT 2010 09 24 22 04 55 31.3200 -97.3300 251.000 122.0 97.282 4.510 -999.990 -999.990 0.973 ..P WKT 2010 09 24 22 09 55 31.3200 -97.3300 251.000 457.0 90.839 4.410 -999.990 -999.990 0.908 ..P WKT 2010 09 24 22 19 55 31.3200 -97.3300 251.000 30.0 93.533 4.320 -999.990 -999.990 0.935 ..P WKT 2010 09 24 22 24 55 31.3200 -97.3300 251.000 122.0 95.135 4.690 -999.990 -999.990 0.951 ..P WKT 2010 09 24 22 29 55 31.3200 -97.3300 251.000 457.0 87.142 4.990 -999.990 -999.990 0.871 ..P WKT 2010 09 24 22 34 55 31.3200 -97.3300 251.000 30.0 85.590 5.990 -999.990 -999.990 0.856 ..P WKT 2010 09 24 22 39 55 31.3200 -97.3300 251.000 122.0 92.950 4.990 -999.990 -999.990 0.929 ..P WKT 2010 09 24 22 44 55 31.3200 -97.3300 251.000 457.0 87.423 4.760 -999.990 -999.990 0.874 ..P WKT 2010 09 24 22 54 55 31.3200 -97.3300 251.000 30.0 93.194 4.960 -999.990 -999.990 0.932 ..P WKT 2010 09 24 22 59 55 31.3200 -97.3300 251.000 122.0 104.769 5.620 -999.990 -999.990 1.048 ..P WKT 2010 09 24 23 04 55 31.3200 -97.3300 251.000 457.0 92.618 5.730 -999.990 -999.990 0.926 ..P WKT 2010 09 24 23 09 55 31.3200 -97.3300 251.000 30.0 97.337 4.900 -999.990 -999.990 0.973 ..P WKT 2010 09 24 23 14 55 31.3200 -97.3300 251.000 122.0 96.844 4.830 -999.990 -999.990 0.968 ..P WKT 2010 09 24 23 19 55 31.3200 -97.3300 251.000 457.0 89.491 5.640 -999.990 -999.990 0.895 ..P WKT 2010 09 24 23 29 55 31.3200 -97.3300 251.000 30.0 90.091 5.460 -999.990 -999.990 0.901 ..P WKT 2010 09 24 23 34 55 31.3200 -97.3300 251.000 122.0 85.421 4.840 -999.990 -999.990 0.854 ..P WKT 2010 09 24 23 39 55 31.3200 -97.3300 251.000 457.0 86.789 5.760 -999.990 -999.990 0.868 ..P WKT 2010 09 24 23 44 55 31.3200 -97.3300 251.000 30.0 91.589 5.120 -999.990 -999.990 0.916 ..P WKT 2010 09 24 23 49 55 31.3200 -97.3300 251.000 122.0 98.585 5.170 -999.990 -999.990 0.986 ..P WKT 2010 09 25 00 09 55 31.3200 -97.3300 251.000 457.0 90.242 4.790 -999.990 -999.990 0.902 ..P WKT 2010 09 25 00 10 25 31.3200 -97.3300 251.000 457.0 96.463 4.940 -999.990 -999.990 0.965 ..P WKT 2010 09 25 00 10 55 31.3200 -97.3300 251.000 457.0 96.095 4.610 -999.990 -999.990 0.961 ..P WKT 2010 09 25 00 11 25 31.3200 -97.3300 251.000 457.0 96.826 4.670 -999.990 -999.990 0.968 ..P WKT 2010 09 25 00 11 55 31.3200 -97.3300 251.000 457.0 98.517 4.640 -999.990 -999.990 0.985 ..P WKT 2010 09 25 00 12 25 31.3200 -97.3300 251.000 457.0 97.875 4.660 -999.990 -999.990 0.979 ..P WKT 2010 09 25 00 12 55 31.3200 -97.3300 251.000 457.0 95.311 4.900 -999.990 -999.990 0.953 ..P WKT 2010 09 25 00 13 25 31.3200 -97.3300 251.000 457.0 95.218 4.620 -999.990 -999.990 0.952 ..P WKT 2010 09 25 00 13 55 31.3200 -97.3300 251.000 457.0 93.752 5.520 -999.990 -999.990 0.938 ..P WKT 2010 09 25 00 14 25 31.3200 -97.3300 251.000 457.0 97.228 4.950 -999.990 -999.990 0.972 ..P WKT 2010 09 25 00 14 55 31.3200 -97.3300 251.000 457.0 95.488 4.950 -999.990 -999.990 0.955 ..P WKT 2010 09 25 00 19 55 31.3200 -97.3300 251.000 30.0 94.282 5.320 -999.990 -999.990 0.943 ..P WKT 2010 09 25 00 24 55 31.3200 -97.3300 251.000 122.0 94.448 5.360 -999.990 -999.990 0.944 ..P WKT 2010 09 25 00 29 55 31.3200 -97.3300 251.000 457.0 89.125 6.000 -999.990 -999.990 0.891 ..P WKT 2010 09 25 00 34 55 31.3200 -97.3300 251.000 30.0 99.174 5.820 -999.990 -999.990 0.992 ..P WKT 2010 09 25 00 39 55 31.3200 -97.3300 251.000 122.0 88.361 5.090 -999.990 -999.990 0.884 ..P WKT 2010 09 25 00 44 55 31.3200 -97.3300 251.000 457.0 84.410 6.010 -999.990 -999.990 0.844 ..P WKT 2010 09 25 00 54 55 31.3200 -97.3300 251.000 30.0 95.399 5.130 -999.990 -999.990 0.954 ..P WKT 2010 09 25 00 59 55 31.3200 -97.3300 251.000 122.0 85.909 5.390 -999.990 -999.990 0.859 ..P WKT 2010 09 25 01 04 55 31.3200 -97.3300 251.000 457.0 85.203 5.760 -999.990 -999.990 0.852 ..P WKT 2010 09 25 01 09 55 31.3200 -97.3300 251.000 30.0 90.260 5.140 -999.990 -999.990 0.903 ..P WKT 2010 09 25 01 14 55 31.3200 -97.3300 251.000 122.0 95.316 5.250 -999.990 -999.990 0.953 ..P WKT 2010 09 25 01 19 55 31.3200 -97.3300 251.000 457.0 89.670 5.120 -999.990 -999.990 0.897 ..P WKT 2010 09 25 01 29 55 31.3200 -97.3300 251.000 30.0 103.937 5.310 -999.990 -999.990 1.039 ..P WKT 2010 09 25 01 34 55 31.3200 -97.3300 251.000 122.0 96.958 5.720 -999.990 -999.990 0.970 ..P WKT 2010 09 25 01 39 55 31.3200 -97.3300 251.000 457.0 95.193 4.900 -999.990 -999.990 0.952 ..P WKT 2010 09 25 01 44 55 31.3200 -97.3300 251.000 30.0 102.758 4.940 -999.990 -999.990 1.028 ..P WKT 2010 09 25 01 49 55 31.3200 -97.3300 251.000 122.0 101.816 4.610 -999.990 -999.990 1.018 ..P WKT 2010 09 25 01 54 55 31.3200 -97.3300 251.000 457.0 103.069 5.150 -999.990 -999.990 1.031 ..P WKT 2010 09 25 02 04 55 31.3200 -97.3300 251.000 30.0 110.376 4.570 -999.990 -999.990 1.104 ..P WKT 2010 09 25 02 09 55 31.3200 -97.3300 251.000 122.0 95.854 5.140 -999.990 -999.990 0.959 ..P WKT 2010 09 25 02 14 55 31.3200 -97.3300 251.000 457.0 91.483 4.900 -999.990 -999.990 0.915 ..P WKT 2010 09 25 02 19 55 31.3200 -97.3300 251.000 30.0 93.011 5.260 -999.990 -999.990 0.930 ..P WKT 2010 09 25 02 24 55 31.3200 -97.3300 251.000 122.0 100.024 5.410 -999.990 -999.990 1.000 ..P WKT 2010 09 25 02 29 55 31.3200 -97.3300 251.000 457.0 95.517 6.410 -999.990 -999.990 0.955 ..P WKT 2010 09 25 02 39 55 31.3200 -97.3300 251.000 30.0 95.260 5.990 -999.990 -999.990 0.953 ..P WKT 2010 09 25 02 44 55 31.3200 -97.3300 251.000 122.0 101.567 5.650 -999.990 -999.990 1.016 ..P WKT 2010 09 25 02 49 55 31.3200 -97.3300 251.000 457.0 99.783 5.490 -999.990 -999.990 0.998 ..P WKT 2010 09 25 02 54 55 31.3200 -97.3300 251.000 30.0 98.959 6.040 -999.990 -999.990 0.990 ..P WKT 2010 09 25 02 59 55 31.3200 -97.3300 251.000 122.0 104.306 5.690 -999.990 -999.990 1.043 ..P WKT 2010 09 25 03 04 55 31.3200 -97.3300 251.000 457.0 105.539 5.690 -999.990 -999.990 1.055 ..P WKT 2010 09 25 03 14 55 31.3200 -97.3300 251.000 30.0 103.734 4.900 -999.990 -999.990 1.037 ..P WKT 2010 09 25 03 19 55 31.3200 -97.3300 251.000 122.0 99.326 5.480 -999.990 -999.990 0.993 ..P WKT 2010 09 25 03 24 55 31.3200 -97.3300 251.000 457.0 105.474 5.260 -999.990 -999.990 1.055 ..P WKT 2010 09 25 03 29 55 31.3200 -97.3300 251.000 30.0 90.647 5.500 -999.990 -999.990 0.906 ..P WKT 2010 09 25 03 34 55 31.3200 -97.3300 251.000 122.0 95.562 4.790 -999.990 -999.990 0.956 ..P WKT 2010 09 25 03 39 55 31.3200 -97.3300 251.000 457.0 107.331 4.580 -999.990 -999.990 1.073 ..P WKT 2010 09 25 03 49 55 31.3200 -97.3300 251.000 30.0 94.482 4.180 -999.990 -999.990 0.945 ..P WKT 2010 09 25 03 54 55 31.3200 -97.3300 251.000 122.0 103.449 5.090 -999.990 -999.990 1.034 ..P WKT 2010 09 25 03 59 55 31.3200 -97.3300 251.000 457.0 94.872 4.560 -999.990 -999.990 0.949 ..P WKT 2010 09 25 04 04 55 31.3200 -97.3300 251.000 30.0 89.036 4.570 -999.990 -999.990 0.890 ..P WKT 2010 09 25 04 09 55 31.3200 -97.3300 251.000 122.0 95.947 4.260 -999.990 -999.990 0.959 ..P WKT 2010 09 25 04 14 55 31.3200 -97.3300 251.000 457.0 88.878 4.120 -999.990 -999.990 0.889 ..P WKT 2010 09 25 04 24 55 31.3200 -97.3300 251.000 30.0 93.046 4.290 -999.990 -999.990 0.930 ..P WKT 2010 09 25 04 29 55 31.3200 -97.3300 251.000 122.0 94.416 4.250 -999.990 -999.990 0.944 ..P WKT 2010 09 25 04 34 55 31.3200 -97.3300 251.000 457.0 97.977 5.000 -999.990 -999.990 0.980 ..P WKT 2010 09 25 04 39 55 31.3200 -97.3300 251.000 30.0 95.236 4.480 -999.990 -999.990 0.952 ..P WKT 2010 09 25 04 44 55 31.3200 -97.3300 251.000 122.0 96.605 4.610 -999.990 -999.990 0.966 ..P WKT 2010 09 25 04 49 55 31.3200 -97.3300 251.000 457.0 99.071 4.910 -999.990 -999.990 0.991 ..P WKT 2010 09 25 05 04 55 31.3200 -97.3300 251.000 30.0 91.258 4.420 -999.990 -999.990 0.913 ..P WKT 2010 09 25 05 09 55 31.3200 -97.3300 251.000 122.0 95.436 4.260 -999.990 -999.990 0.954 ..P WKT 2010 09 25 05 14 55 31.3200 -97.3300 251.000 457.0 101.805 4.670 -999.990 -999.990 1.018 ..P WKT 2010 09 25 05 19 55 31.3200 -97.3300 251.000 30.0 97.488 4.300 -999.990 -999.990 0.975 ..P WKT 2010 09 25 05 24 55 31.3200 -97.3300 251.000 122.0 99.473 4.480 -999.990 -999.990 0.995 ..P WKT 2010 09 25 05 29 55 31.3200 -97.3300 251.000 457.0 105.842 4.260 -999.990 -999.990 1.058 ..P WKT 2010 09 25 05 39 55 31.3200 -97.3300 251.000 30.0 103.990 4.110 -999.990 -999.990 1.040 ..P WKT 2010 09 25 05 44 55 31.3200 -97.3300 251.000 122.0 105.359 4.250 -999.990 -999.990 1.054 ..P WKT 2010 09 25 05 49 55 31.3200 -97.3300 251.000 457.0 107.823 4.960 -999.990 -999.990 1.078 ..P WKT 2010 09 25 05 54 55 31.3200 -97.3300 251.000 30.0 107.547 4.490 -999.990 -999.990 1.075 ..P WKT 2010 09 25 05 59 55 31.3200 -97.3300 251.000 122.0 104.258 4.190 -999.990 -999.990 1.043 ..P WKT 2010 09 25 06 04 55 31.3200 -97.3300 251.000 457.0 101.245 5.070 -999.990 -999.990 1.012 ..P WKT 2010 09 25 06 14 55 31.3200 -97.3300 251.000 30.0 102.181 4.710 -999.990 -999.990 1.022 ..P WKT 2010 09 25 06 19 55 31.3200 -97.3300 251.000 122.0 106.953 4.890 -999.990 -999.990 1.070 ..P WKT 2010 09 25 06 24 55 31.3200 -97.3300 251.000 457.0 96.663 4.530 -999.990 -999.990 0.967 ..P WKT 2010 09 25 06 29 55 31.3200 -97.3300 251.000 30.0 104.173 4.590 -999.990 -999.990 1.042 ..P WKT 2010 09 25 06 34 55 31.3200 -97.3300 251.000 122.0 114.969 5.310 -999.990 -999.990 1.150 ..P WKT 2010 09 25 06 39 55 31.3200 -97.3300 251.000 457.0 101.256 5.610 -999.990 -999.990 1.013 ..P WKT 2010 09 25 06 49 55 31.3200 -97.3300 251.000 30.0 105.576 4.910 -999.990 -999.990 1.056 ..P WKT 2010 09 25 06 54 55 31.3200 -97.3300 251.000 122.0 111.696 4.990 -999.990 -999.990 1.117 ..P WKT 2010 09 25 06 59 55 31.3200 -97.3300 251.000 457.0 107.138 5.160 -999.990 -999.990 1.071 ..P WKT 2010 09 25 07 04 55 31.3200 -97.3300 251.000 30.0 97.651 4.980 -999.990 -999.990 0.977 ..P WKT 2010 09 25 07 09 55 31.3200 -97.3300 251.000 122.0 105.962 5.100 -999.990 -999.990 1.060 ..P WKT 2010 09 25 07 14 55 31.3200 -97.3300 251.000 457.0 103.731 5.470 -999.990 -999.990 1.037 ..P WKT 2010 09 25 07 24 55 31.3200 -97.3300 251.000 30.0 105.020 4.620 -999.990 -999.990 1.050 ..P WKT 2010 09 25 07 29 55 31.3200 -97.3300 251.000 122.0 107.032 4.710 -999.990 -999.990 1.070 ..P WKT 2010 09 25 07 34 55 31.3200 -97.3300 251.000 457.0 106.033 6.490 -999.990 -999.990 1.060 ..P WKT 2010 09 25 07 39 55 31.3200 -97.3300 251.000 30.0 101.066 4.700 -999.990 -999.990 1.011 ..P WKT 2010 09 25 07 44 55 31.3200 -97.3300 251.000 122.0 105.953 4.870 -999.990 -999.990 1.060 ..P WKT 2010 09 25 07 49 55 31.3200 -97.3300 251.000 457.0 104.954 5.390 -999.990 -999.990 1.050 ..P WKT 2010 09 25 07 59 55 31.3200 -97.3300 251.000 30.0 106.417 4.900 -999.990 -999.990 1.064 ..P WKT 2010 09 25 08 04 55 31.3200 -97.3300 251.000 122.0 100.668 4.910 -999.990 -999.990 1.007 ..P WKT 2010 09 25 08 09 55 31.3200 -97.3300 251.000 457.0 90.816 5.010 -999.990 -999.990 0.908 ..P WKT 2010 09 25 08 14 55 31.3200 -97.3300 251.000 30.0 98.751 5.740 -999.990 -999.990 0.988 ..P WKT 2010 09 25 08 19 55 31.3200 -97.3300 251.000 122.0 102.854 5.170 -999.990 -999.990 1.029 ..P WKT 2010 09 25 08 24 55 31.3200 -97.3300 251.000 457.0 135.416 4.780 -999.990 -999.990 1.354 ..P WKT 2010 09 25 08 34 55 31.3200 -97.3300 251.000 30.0 99.293 4.600 -999.990 -999.990 0.993 ..P WKT 2010 09 25 08 39 55 31.3200 -97.3300 251.000 122.0 99.840 5.000 -999.990 -999.990 0.998 ..P WKT 2010 09 25 08 44 55 31.3200 -97.3300 251.000 457.0 112.424 4.960 -999.990 -999.990 1.124 ..P WKT 2010 09 25 08 49 55 31.3200 -97.3300 251.000 30.0 113.517 5.290 -999.990 -999.990 1.135 ..P WKT 2010 09 25 08 54 55 31.3200 -97.3300 251.000 122.0 105.582 5.500 -999.990 -999.990 1.056 ..P WKT 2010 09 25 08 59 55 31.3200 -97.3300 251.000 457.0 92.448 4.590 -999.990 -999.990 0.924 ..P WKT 2010 09 25 09 09 55 31.3200 -97.3300 251.000 30.0 105.577 5.630 -999.990 -999.990 1.056 ..P WKT 2010 09 25 09 14 55 31.3200 -97.3300 251.000 122.0 103.388 5.180 -999.990 -999.990 1.034 ..P WKT 2010 09 25 09 19 55 31.3200 -97.3300 251.000 457.0 86.153 5.110 -999.990 -999.990 0.862 ..P WKT 2010 09 25 09 24 55 31.3200 -97.3300 251.000 30.0 105.846 5.680 -999.990 -999.990 1.058 ..P WKT 2010 09 25 09 29 55 31.3200 -97.3300 251.000 122.0 103.657 4.240 -999.990 -999.990 1.037 ..P WKT 2010 09 25 09 34 55 31.3200 -97.3300 251.000 457.0 88.065 4.180 -999.990 -999.990 0.881 ..P WKT 2010 09 25 09 44 55 31.3200 -97.3300 251.000 30.0 105.157 4.750 -999.990 -999.990 1.052 ..P WKT 2010 09 25 09 49 55 31.3200 -97.3300 251.000 122.0 109.669 4.250 -999.990 -999.990 1.097 ..P WKT 2010 09 25 09 54 55 31.3200 -97.3300 251.000 457.0 93.121 4.210 -999.990 -999.990 0.931 ..P WKT 2010 09 25 09 59 55 31.3200 -97.3300 251.000 30.0 106.931 5.100 -999.990 -999.990 1.069 ..P WKT 2010 09 25 10 04 55 31.3200 -97.3300 251.000 122.0 102.964 4.740 -999.990 -999.990 1.030 ..P WKT 2010 09 25 10 09 55 31.3200 -97.3300 251.000 457.0 90.247 4.660 -999.990 -999.990 0.902 ..P WKT 2010 09 25 10 19 55 31.3200 -97.3300 251.000 30.0 99.816 5.620 -999.990 -999.990 0.998 ..P WKT 2010 09 25 10 24 55 31.3200 -97.3300 251.000 122.0 103.233 4.440 -999.990 -999.990 1.032 ..P WKT 2010 09 25 10 29 55 31.3200 -97.3300 251.000 457.0 87.783 4.260 -999.990 -999.990 0.878 ..P WKT 2010 09 25 10 34 55 31.3200 -97.3300 251.000 30.0 104.597 4.510 -999.990 -999.990 1.046 ..P WKT 2010 09 25 10 39 55 31.3200 -97.3300 251.000 122.0 102.682 4.340 -999.990 -999.990 1.027 ..P WKT 2010 09 25 10 44 55 31.3200 -97.3300 251.000 457.0 89.148 4.640 -999.990 -999.990 0.891 ..P WKT 2010 09 25 10 54 55 31.3200 -97.3300 251.000 30.0 104.065 4.180 -999.990 -999.990 1.041 ..P WKT 2010 09 25 10 59 55 31.3200 -97.3300 251.000 122.0 96.292 5.250 -999.990 -999.990 0.963 ..P WKT 2010 09 25 11 04 55 31.3200 -97.3300 251.000 457.0 83.191 4.610 -999.990 -999.990 0.832 ..P WKT 2010 09 25 11 09 55 31.3200 -97.3300 251.000 30.0 101.523 5.260 -999.990 -999.990 1.015 ..P WKT 2010 09 25 11 14 55 31.3200 -97.3300 251.000 122.0 97.168 4.610 -999.990 -999.990 0.972 ..P WKT 2010 09 25 11 19 55 31.3200 -97.3300 251.000 457.0 83.384 4.470 -999.990 -999.990 0.834 ..P WKT 2010 09 25 11 29 55 31.3200 -97.3300 251.000 30.0 98.246 4.240 -999.990 -999.990 0.982 ..P WKT 2010 09 25 11 34 55 31.3200 -97.3300 251.000 122.0 91.225 4.330 -999.990 -999.990 0.912 ..P WKT 2010 09 25 11 39 55 31.3200 -97.3300 251.000 457.0 82.154 4.300 -999.990 -999.990 0.822 ..P WKT 2010 09 25 11 44 55 31.3200 -97.3300 251.000 30.0 99.866 4.220 -999.990 -999.990 0.999 ..P WKT 2010 09 25 11 49 55 31.3200 -97.3300 251.000 122.0 94.074 4.350 -999.990 -999.990 0.941 ..P WKT 2010 09 25 12 09 55 31.3200 -97.3300 251.000 457.0 83.165 4.400 -999.990 -999.990 0.832 ..P WKT 2010 09 25 12 10 25 31.3200 -97.3300 251.000 457.0 79.860 4.070 -999.990 -999.990 0.799 ..P WKT 2010 09 25 12 10 55 31.3200 -97.3300 251.000 457.0 81.201 4.550 -999.990 -999.990 0.812 ..P WKT 2010 09 25 12 11 25 31.3200 -97.3300 251.000 457.0 83.634 4.300 -999.990 -999.990 0.836 ..P WKT 2010 09 25 12 11 55 31.3200 -97.3300 251.000 457.0 80.329 4.130 -999.990 -999.990 0.803 ..P WKT 2010 09 25 12 12 25 31.3200 -97.3300 251.000 457.0 83.855 4.160 -999.990 -999.990 0.839 ..P WKT 2010 09 25 12 12 55 31.3200 -97.3300 251.000 457.0 77.271 4.360 -999.990 -999.990 0.773 ..P WKT 2010 09 25 12 13 25 31.3200 -97.3300 251.000 457.0 81.617 4.110 -999.990 -999.990 0.816 ..P WKT 2010 09 25 12 13 55 31.3200 -97.3300 251.000 457.0 78.039 4.600 -999.990 -999.990 0.780 ..P WKT 2010 09 25 12 14 25 31.3200 -97.3300 251.000 457.0 77.193 4.640 -999.990 -999.990 0.772 ..P WKT 2010 09 25 12 14 55 31.3200 -97.3300 251.000 457.0 80.994 4.040 -999.990 -999.990 0.810 ..P WKT 2010 09 25 12 19 55 31.3200 -97.3300 251.000 30.0 97.679 4.080 -999.990 -999.990 0.977 ..P WKT 2010 09 25 12 24 55 31.3200 -97.3300 251.000 122.0 94.962 4.980 -999.990 -999.990 0.950 ..P WKT 2010 09 25 12 29 55 31.3200 -97.3300 251.000 457.0 78.030 4.960 -999.990 -999.990 0.780 ..P WKT 2010 09 25 12 34 55 31.3200 -97.3300 251.000 30.0 98.820 5.200 -999.990 -999.990 0.988 ..P WKT 2010 09 25 12 39 55 31.3200 -97.3300 251.000 122.0 94.188 5.110 -999.990 -999.990 0.942 ..P WKT 2010 09 25 12 44 55 31.3200 -97.3300 251.000 457.0 79.167 5.340 -999.990 -999.990 0.792 ..P WKT 2010 09 25 12 54 55 31.3200 -97.3300 251.000 30.0 111.460 4.060 -999.990 -999.990 1.115 ..P WKT 2010 09 25 12 59 55 31.3200 -97.3300 251.000 122.0 96.984 4.740 -999.990 -999.990 0.970 ..P WKT 2010 09 25 13 04 55 31.3200 -97.3300 251.000 457.0 87.429 4.880 -999.990 -999.990 0.874 ..P WKT 2010 09 25 13 09 55 31.3200 -97.3300 251.000 30.0 110.963 5.240 -999.990 -999.990 1.110 ..P WKT 2010 09 25 13 14 55 31.3200 -97.3300 251.000 122.0 104.688 4.600 -999.990 -999.990 1.047 ..P WKT 2010 09 25 13 19 55 31.3200 -97.3300 251.000 457.0 92.670 4.310 -999.990 -999.990 0.927 ..P WKT 2010 09 25 13 29 55 31.3200 -97.3300 251.000 30.0 116.363 4.050 -999.990 -999.990 1.164 ..P WKT 2010 09 25 13 34 55 31.3200 -97.3300 251.000 122.0 110.771 4.680 -999.990 -999.990 1.108 ..P WKT 2010 09 25 13 39 55 31.3200 -97.3300 251.000 457.0 99.707 4.960 -999.990 -999.990 0.997 ..P WKT 2010 09 25 13 44 55 31.3200 -97.3300 251.000 30.0 118.465 4.350 -999.990 -999.990 1.185 ..P WKT 2010 09 25 13 49 55 31.3200 -97.3300 251.000 122.0 111.778 4.360 -999.990 -999.990 1.118 ..P WKT 2010 09 25 13 54 55 31.3200 -97.3300 251.000 457.0 96.881 4.040 -999.990 -999.990 0.969 ..P WKT 2010 09 25 14 04 55 31.3200 -97.3300 251.000 30.0 117.262 4.310 -999.990 -999.990 1.173 ..P WKT 2010 09 25 14 09 55 31.3200 -97.3300 251.000 122.0 116.144 4.360 -999.990 -999.990 1.161 ..P WKT 2010 09 25 14 14 55 31.3200 -97.3300 251.000 457.0 109.006 5.050 -999.990 -999.990 1.090 ..P WKT 2010 09 25 14 19 55 31.3200 -97.3300 251.000 30.0 115.142 6.070 -999.990 -999.990 1.151 ..P WKT 2010 09 25 14 24 55 31.3200 -97.3300 251.000 122.0 121.963 4.270 -999.990 -999.990 1.220 ..P WKT 2010 09 25 14 29 55 31.3200 -97.3300 251.000 457.0 105.243 4.340 -999.990 -999.990 1.052 ..P WKT 2010 09 25 14 39 55 31.3200 -97.3300 251.000 30.0 130.638 4.510 -999.990 -999.990 1.306 ..P WKT 2010 09 25 14 44 55 31.3200 -97.3300 251.000 122.0 131.555 4.310 -999.990 -999.990 1.316 ..P WKT 2010 09 25 14 49 55 31.3200 -97.3300 251.000 457.0 82.502 4.580 -999.990 -999.990 0.825 ..P WKT 2010 09 25 14 54 55 31.3200 -97.3300 251.000 30.0 140.784 4.700 -999.990 -999.990 1.408 ..P WKT 2010 09 25 14 59 55 31.3200 -97.3300 251.000 122.0 124.313 4.150 -999.990 -999.990 1.243 ..P WKT 2010 09 25 15 04 55 31.3200 -97.3300 251.000 457.0 81.001 4.860 -999.990 -999.990 0.810 ..P WKT 2010 09 25 15 14 55 31.3200 -97.3300 251.000 30.0 114.367 5.110 -999.990 -999.990 1.144 ..P WKT 2010 09 25 15 19 55 31.3200 -97.3300 251.000 122.0 113.405 4.560 -999.990 -999.990 1.134 ..P WKT 2010 09 25 15 24 55 31.3200 -97.3300 251.000 457.0 84.091 5.120 -999.990 -999.990 0.841 ..P WKT 2010 09 25 15 29 55 31.3200 -97.3300 251.000 30.0 110.934 5.150 -999.990 -999.990 1.109 ..P WKT 2010 09 25 15 34 55 31.3200 -97.3300 251.000 122.0 121.615 5.830 -999.990 -999.990 1.216 ..P WKT 2010 09 25 15 39 55 31.3200 -97.3300 251.000 457.0 111.612 5.490 -999.990 -999.990 1.116 ..P WKT 2010 09 25 15 49 55 31.3200 -97.3300 251.000 30.0 118.750 6.240 -999.990 -999.990 1.188 ..P WKT 2010 09 25 15 54 55 31.3200 -97.3300 251.000 122.0 114.657 4.730 -999.990 -999.990 1.147 ..P WKT 2010 09 25 15 59 55 31.3200 -97.3300 251.000 457.0 109.603 5.750 -999.990 -999.990 1.096 ..P WKT 2010 09 25 16 04 55 31.3200 -97.3300 251.000 30.0 109.620 4.190 -999.990 -999.990 1.096 ..P WKT 2010 09 25 16 09 55 31.3200 -97.3300 251.000 122.0 110.732 4.180 -999.990 -999.990 1.107 ..P WKT 2010 09 25 16 14 55 31.3200 -97.3300 251.000 457.0 115.683 3.720 -999.990 -999.990 1.157 ..P WKT 2010 09 25 16 24 55 31.3200 -97.3300 251.000 30.0 108.275 3.960 -999.990 -999.990 1.083 ..P WKT 2010 09 25 16 29 55 31.3200 -97.3300 251.000 122.0 116.203 4.580 -999.990 -999.990 1.162 ..P WKT 2010 09 25 16 34 55 31.3200 -97.3300 251.000 457.0 105.488 4.750 -999.990 -999.990 1.055 ..P WKT 2010 09 25 16 39 55 31.3200 -97.3300 251.000 30.0 108.755 4.850 -999.990 -999.990 1.088 ..P WKT 2010 09 25 16 44 55 31.3200 -97.3300 251.000 122.0 116.410 4.280 -999.990 -999.990 1.164 ..P WKT 2010 09 25 16 49 55 31.3200 -97.3300 251.000 457.0 104.596 3.640 -999.990 -999.990 1.046 ..P WKT 2010 09 25 17 04 55 31.3200 -97.3300 251.000 30.0 112.490 3.940 -999.990 -999.990 1.125 ..P WKT 2010 09 25 17 09 55 31.3200 -97.3300 251.000 122.0 115.627 4.470 -999.990 -999.990 1.156 ..P WKT 2010 09 25 17 14 55 31.3200 -97.3300 251.000 457.0 114.923 4.980 -999.990 -999.990 1.149 ..P WKT 2010 09 25 17 19 55 31.3200 -97.3300 251.000 30.0 115.318 3.840 -999.990 -999.990 1.153 ..P WKT 2010 09 25 17 24 55 31.3200 -97.3300 251.000 122.0 122.570 3.920 -999.990 -999.990 1.226 ..P WKT 2010 09 25 17 29 55 31.3200 -97.3300 251.000 457.0 122.141 4.760 -999.990 -999.990 1.221 ..P WKT 2010 09 25 17 39 55 31.3200 -97.3300 251.000 30.0 116.653 3.780 -999.990 -999.990 1.167 ..P WKT 2010 09 25 17 44 55 31.3200 -97.3300 251.000 122.0 120.924 3.820 -999.990 -999.990 1.209 ..P WKT 2010 09 25 17 49 55 31.3200 -97.3300 251.000 457.0 120.529 4.200 -999.990 -999.990 1.205 ..P WKT 2010 09 25 17 54 55 31.3200 -97.3300 251.000 30.0 121.919 4.490 -999.990 -999.990 1.219 ..P WKT 2010 09 25 17 59 55 31.3200 -97.3300 251.000 122.0 121.798 4.020 -999.990 -999.990 1.218 ..P WKT 2010 09 25 18 04 55 31.3200 -97.3300 251.000 457.0 115.914 4.230 -999.990 -999.990 1.159 ..P WKT 2010 09 25 18 14 55 31.3200 -97.3300 251.000 30.0 110.830 4.320 -999.990 -999.990 1.108 ..P WKT 2010 09 25 18 19 55 31.3200 -97.3300 251.000 122.0 111.631 4.090 -999.990 -999.990 1.116 ..P WKT 2010 09 25 18 24 55 31.3200 -97.3300 251.000 457.0 117.923 3.990 -999.990 -999.990 1.179 ..P WKT 2010 09 25 18 29 55 31.3200 -97.3300 251.000 30.0 106.095 4.040 -999.990 -999.990 1.061 ..P WKT 2010 09 25 18 34 55 31.3200 -97.3300 251.000 122.0 108.406 3.880 -999.990 -999.990 1.084 ..P WKT 2010 09 25 18 39 55 31.3200 -97.3300 251.000 457.0 117.856 4.180 -999.990 -999.990 1.179 ..P WKT 2010 09 25 18 49 55 31.3200 -97.3300 251.000 30.0 100.962 3.930 -999.990 -999.990 1.010 ..P WKT 2010 09 25 18 54 55 31.3200 -97.3300 251.000 122.0 110.040 3.860 -999.990 -999.990 1.100 ..P WKT 2010 09 25 18 59 55 31.3200 -97.3300 251.000 457.0 121.454 3.830 -999.990 -999.990 1.215 ..P WKT 2010 09 25 19 04 55 31.3200 -97.3300 251.000 30.0 109.386 4.060 -999.990 -999.990 1.094 ..P WKT 2010 09 25 19 09 55 31.3200 -97.3300 251.000 122.0 110.364 3.320 -999.990 -999.990 1.104 ..P WKT 2010 09 25 19 14 55 31.3200 -97.3300 251.000 457.0 115.737 3.520 -999.990 -999.990 1.157 ..P WKT 2010 09 25 19 24 55 31.3200 -97.3300 251.000 30.0 112.886 3.610 -999.990 -999.990 1.129 ..P WKT 2010 09 25 19 29 55 31.3200 -97.3300 251.000 122.0 113.452 3.470 -999.990 -999.990 1.135 ..P WKT 2010 09 25 19 34 55 31.3200 -97.3300 251.000 457.0 115.254 3.590 -999.990 -999.990 1.153 ..P WKT 2010 09 25 19 39 55 31.3200 -97.3300 251.000 30.0 115.684 5.830 -999.990 -999.990 1.157 ..P WKT 2010 09 25 19 44 55 31.3200 -97.3300 251.000 122.0 117.212 5.090 -999.990 -999.990 1.172 ..P WKT 2010 09 25 19 49 55 31.3200 -97.3300 251.000 457.0 110.770 3.300 -999.990 -999.990 1.108 ..P WKT 2010 09 25 19 59 55 31.3200 -97.3300 251.000 30.0 113.964 3.600 -999.990 -999.990 1.140 ..P WKT 2010 09 25 20 04 55 31.3200 -97.3300 251.000 122.0 118.378 3.420 -999.990 -999.990 1.184 ..P WKT 2010 09 25 20 09 55 31.3200 -97.3300 251.000 457.0 105.202 4.060 -999.990 -999.990 1.052 ..P WKT 2010 09 25 20 14 55 31.3200 -97.3300 251.000 30.0 121.437 3.980 -999.990 -999.990 1.214 ..P WKT 2010 09 25 20 19 55 31.3200 -97.3300 251.000 122.0 119.254 4.940 -999.990 -999.990 1.193 ..P WKT 2010 09 25 20 24 55 31.3200 -97.3300 251.000 457.0 99.751 5.350 -999.990 -999.990 0.998 ..P WKT 2010 09 25 20 34 55 31.3200 -97.3300 251.000 30.0 118.323 4.290 -999.990 -999.990 1.183 ..P WKT 2010 09 25 20 39 55 31.3200 -97.3300 251.000 122.0 123.958 4.270 -999.990 -999.990 1.240 ..P WKT 2010 09 25 20 44 55 31.3200 -97.3300 251.000 457.0 91.918 5.390 -999.990 -999.990 0.919 ..P WKT 2010 09 25 20 49 55 31.3200 -97.3300 251.000 30.0 131.654 4.810 -999.990 -999.990 1.317 ..P WKT 2010 09 25 20 54 55 31.3200 -97.3300 251.000 122.0 132.339 5.200 -999.990 -999.990 1.323 ..P WKT 2010 09 25 20 59 55 31.3200 -97.3300 251.000 457.0 93.693 4.400 -999.990 -999.990 0.937 ..P WKT 2010 09 25 21 09 55 31.3200 -97.3300 251.000 30.0 131.882 4.870 -999.990 -999.990 1.319 ..P WKT 2010 09 25 21 14 55 31.3200 -97.3300 251.000 122.0 133.354 5.760 -999.990 -999.990 1.334 ..P WKT 2010 09 25 21 19 55 31.3200 -97.3300 251.000 457.0 97.685 4.490 -999.990 -999.990 0.977 ..P WKT 2010 09 25 21 24 55 31.3200 -97.3300 251.000 30.0 133.272 3.500 -999.990 -999.990 1.333 ..P WKT 2010 09 25 21 29 55 31.3200 -97.3300 251.000 122.0 127.866 3.180 -999.990 -999.990 1.279 ..P WKT 2010 09 25 21 34 55 31.3200 -97.3300 251.000 457.0 94.392 3.320 -999.990 -999.990 0.944 ..P WKT 2010 09 25 21 44 55 31.3200 -97.3300 251.000 30.0 127.132 3.250 -999.990 -999.990 1.271 ..P WKT 2010 09 25 21 49 55 31.3200 -97.3300 251.000 122.0 128.408 4.790 -999.990 -999.990 1.284 ..P WKT 2010 09 25 21 54 55 31.3200 -97.3300 251.000 457.0 99.407 3.380 -999.990 -999.990 0.994 ..P WKT 2010 09 25 21 59 55 31.3200 -97.3300 251.000 30.0 122.840 3.850 -999.990 -999.990 1.228 ..P WKT 2010 09 25 22 04 55 31.3200 -97.3300 251.000 122.0 125.491 3.520 -999.990 -999.990 1.255 ..P WKT 2010 09 25 22 09 55 31.3200 -97.3300 251.000 457.0 113.003 4.640 -999.990 -999.990 1.130 ..P WKT 2010 09 25 22 19 55 31.3200 -97.3300 251.000 30.0 124.501 3.750 -999.990 -999.990 1.245 ..P WKT 2010 09 25 22 24 55 31.3200 -97.3300 251.000 122.0 124.125 4.440 -999.990 -999.990 1.241 ..P WKT 2010 09 25 22 29 55 31.3200 -97.3300 251.000 457.0 113.011 3.950 -999.990 -999.990 1.130 ..P WKT 2010 09 25 22 34 55 31.3200 -97.3300 251.000 30.0 123.786 4.160 -999.990 -999.990 1.238 ..P WKT 2010 09 25 22 39 55 31.3200 -97.3300 251.000 122.0 131.671 3.630 -999.990 -999.990 1.317 ..P WKT 2010 09 25 22 44 55 31.3200 -97.3300 251.000 457.0 131.847 3.860 -999.990 -999.990 1.318 ..P WKT 2010 09 25 22 54 55 31.3200 -97.3300 251.000 30.0 125.666 3.970 -999.990 -999.990 1.257 ..P WKT 2010 09 25 22 59 55 31.3200 -97.3300 251.000 122.0 122.889 3.850 -999.990 -999.990 1.229 ..P WKT 2010 09 25 23 04 55 31.3200 -97.3300 251.000 457.0 121.489 3.800 -999.990 -999.990 1.215 ..P WKT 2010 09 25 23 09 55 31.3200 -97.3300 251.000 30.0 98.602 4.010 -999.990 -999.990 0.986 ..P WKT 2010 09 25 23 14 55 31.3200 -97.3300 251.000 122.0 103.538 4.890 -999.990 -999.990 1.035 ..P WKT 2010 09 25 23 19 55 31.3200 -97.3300 251.000 457.0 115.087 4.180 -999.990 -999.990 1.151 ..P WKT 2010 09 25 23 29 55 31.3200 -97.3300 251.000 30.0 98.479 3.930 -999.990 -999.990 0.985 ..P WKT 2010 09 25 23 34 55 31.3200 -97.3300 251.000 122.0 104.350 3.880 -999.990 -999.990 1.043 ..P WKT 2010 09 25 23 39 55 31.3200 -97.3300 251.000 457.0 115.734 6.690 -999.990 -999.990 1.157 ..P WKT 2010 09 25 23 44 55 31.3200 -97.3300 251.000 30.0 100.111 5.340 -999.990 -999.990 1.001 ..P WKT 2010 09 25 23 49 55 31.3200 -97.3300 251.000 122.0 107.775 4.150 -999.990 -999.990 1.078 ..P WKT 2010 09 26 00 09 55 31.3200 -97.3300 251.000 457.0 109.336 3.650 -999.990 -999.990 1.093 ..P WKT 2010 09 26 00 10 25 31.3200 -97.3300 251.000 457.0 107.970 3.610 -999.990 -999.990 1.080 ..P WKT 2010 09 26 00 10 55 31.3200 -97.3300 251.000 457.0 108.810 4.550 -999.990 -999.990 1.088 ..P WKT 2010 09 26 00 11 25 31.3200 -97.3300 251.000 457.0 100.829 3.320 -999.990 -999.990 1.008 ..P WKT 2010 09 26 00 11 55 31.3200 -97.3300 251.000 457.0 101.669 3.370 -999.990 -999.990 1.017 ..P WKT 2010 09 26 00 12 25 31.3200 -97.3300 251.000 457.0 104.163 3.930 -999.990 -999.990 1.042 ..P WKT 2010 09 26 00 12 55 31.3200 -97.3300 251.000 457.0 105.555 3.720 -999.990 -999.990 1.056 ..P WKT 2010 09 26 00 13 25 31.3200 -97.3300 251.000 457.0 102.812 4.290 -999.990 -999.990 1.028 ..P WKT 2010 09 26 00 13 55 31.3200 -97.3300 251.000 457.0 102.549 3.390 -999.990 -999.990 1.025 ..P WKT 2010 09 26 00 14 25 31.3200 -97.3300 251.000 457.0 101.735 4.100 -999.990 -999.990 1.017 ..P WKT 2010 09 26 00 14 55 31.3200 -97.3300 251.000 457.0 100.646 4.180 -999.990 -999.990 1.006 ..P WKT 2010 09 26 00 19 55 31.3200 -97.3300 251.000 30.0 103.258 3.670 -999.990 -999.990 1.033 ..P WKT 2010 09 26 00 24 55 31.3200 -97.3300 251.000 122.0 111.658 4.150 -999.990 -999.990 1.117 ..P WKT 2010 09 26 00 29 55 31.3200 -97.3300 251.000 457.0 112.341 3.980 -999.990 -999.990 1.123 ..P WKT 2010 09 26 00 34 55 31.3200 -97.3300 251.000 30.0 109.165 3.570 -999.990 -999.990 1.092 ..P WKT 2010 09 26 00 39 55 31.3200 -97.3300 251.000 122.0 102.957 3.300 -999.990 -999.990 1.030 ..P WKT 2010 09 26 00 44 55 31.3200 -97.3300 251.000 457.0 119.624 3.020 -999.990 -999.990 1.196 ..P WKT 2010 09 26 00 54 55 31.3200 -97.3300 251.000 30.0 105.756 3.330 -999.990 -999.990 1.058 ..P WKT 2010 09 26 00 59 55 31.3200 -97.3300 251.000 122.0 104.160 3.810 -999.990 -999.990 1.042 ..P WKT 2010 09 26 01 04 55 31.3200 -97.3300 251.000 457.0 114.413 4.330 -999.990 -999.990 1.144 ..P WKT 2010 09 26 01 09 55 31.3200 -97.3300 251.000 30.0 108.683 3.860 -999.990 -999.990 1.087 ..P WKT 2010 09 26 01 14 55 31.3200 -97.3300 251.000 122.0 126.652 4.090 -999.990 -999.990 1.267 ..P WKT 2010 09 26 01 19 55 31.3200 -97.3300 251.000 457.0 105.766 3.450 -999.990 -999.990 1.058 ..P WKT 2010 09 26 01 29 55 31.3200 -97.3300 251.000 30.0 117.708 4.480 -999.990 -999.990 1.177 ..P WKT 2010 09 26 01 34 55 31.3200 -97.3300 251.000 122.0 110.581 4.760 -999.990 -999.990 1.106 ..P WKT 2010 09 26 01 39 55 31.3200 -97.3300 251.000 457.0 113.649 6.080 -999.990 -999.990 1.136 ..P WKT 2010 09 26 01 44 55 31.3200 -97.3300 251.000 30.0 116.442 3.500 -999.990 -999.990 1.164 ..P WKT 2010 09 26 01 49 55 31.3200 -97.3300 251.000 122.0 115.514 3.850 -999.990 -999.990 1.155 ..P WKT 2010 09 26 01 54 55 31.3200 -97.3300 251.000 457.0 102.877 4.330 -999.990 -999.990 1.029 ..P WKT 2010 09 26 02 04 55 31.3200 -97.3300 251.000 30.0 138.079 3.940 -999.990 -999.990 1.381 ..P WKT 2010 09 26 02 09 55 31.3200 -97.3300 251.000 122.0 113.320 4.050 -999.990 -999.990 1.133 ..P WKT 2010 09 26 02 14 55 31.3200 -97.3300 251.000 457.0 113.771 4.750 -999.990 -999.990 1.138 ..P WKT 2010 09 26 02 19 55 31.3200 -97.3300 251.000 30.0 132.403 4.130 -999.990 -999.990 1.324 ..P WKT 2010 09 26 02 24 55 31.3200 -97.3300 251.000 122.0 119.492 4.410 -999.990 -999.990 1.195 ..P WKT 2010 09 26 02 29 55 31.3200 -97.3300 251.000 457.0 110.714 4.350 -999.990 -999.990 1.107 ..P WKT 2010 09 26 02 39 55 31.3200 -97.3300 251.000 30.0 149.451 4.290 -999.990 -999.990 1.495 ..P WKT 2010 09 26 02 44 55 31.3200 -97.3300 251.000 122.0 127.687 3.930 -999.990 -999.990 1.277 ..P WKT 2010 09 26 02 49 55 31.3200 -97.3300 251.000 457.0 105.373 6.120 -999.990 -999.990 1.054 ..P WKT 2010 09 26 02 54 55 31.3200 -97.3300 251.000 30.0 143.106 4.660 -999.990 -999.990 1.431 ..P WKT 2010 09 26 02 59 55 31.3200 -97.3300 251.000 122.0 123.961 5.260 -999.990 -999.990 1.240 ..P WKT 2010 09 26 03 04 55 31.3200 -97.3300 251.000 457.0 102.475 4.540 -999.990 -999.990 1.025 ..P WKT 2010 09 26 03 14 55 31.3200 -97.3300 251.000 30.0 126.471 4.970 -999.990 -999.990 1.265 ..P WKT 2010 09 26 03 19 55 31.3200 -97.3300 251.000 122.0 123.616 3.920 -999.990 -999.990 1.236 ..P WKT 2010 09 26 03 24 55 31.3200 -97.3300 251.000 457.0 101.896 4.610 -999.990 -999.990 1.019 ..P WKT 2010 09 26 03 29 55 31.3200 -97.3300 251.000 30.0 124.103 4.410 -999.990 -999.990 1.241 ..P WKT 2010 09 26 03 34 55 31.3200 -97.3300 251.000 122.0 117.393 4.350 -999.990 -999.990 1.174 ..P WKT 2010 09 26 03 39 55 31.3200 -97.3300 251.000 457.0 98.428 3.460 -999.990 -999.990 0.984 ..P WKT 2010 09 26 03 49 55 31.3200 -97.3300 251.000 30.0 132.806 3.510 -999.990 -999.990 1.328 ..P WKT 2010 09 26 03 54 55 31.3200 -97.3300 251.000 122.0 116.892 4.100 -999.990 -999.990 1.169 ..P WKT 2010 09 26 03 59 55 31.3200 -97.3300 251.000 457.0 97.398 3.980 -999.990 -999.990 0.974 ..P WKT 2010 09 26 04 04 55 31.3200 -97.3300 251.000 30.0 118.933 3.730 -999.990 -999.990 1.189 ..P WKT 2010 09 26 04 09 55 31.3200 -97.3300 251.000 122.0 120.641 3.900 -999.990 -999.990 1.206 ..P WKT 2010 09 26 04 14 55 31.3200 -97.3300 251.000 457.0 97.845 3.910 -999.990 -999.990 0.978 ..P WKT 2010 09 26 04 24 55 31.3200 -97.3300 251.000 30.0 129.464 4.100 -999.990 -999.990 1.295 ..P WKT 2010 09 26 04 29 55 31.3200 -97.3300 251.000 122.0 127.160 4.310 -999.990 -999.990 1.272 ..P WKT 2010 09 26 04 34 55 31.3200 -97.3300 251.000 457.0 91.269 3.960 -999.990 -999.990 0.913 ..P WKT 2010 09 26 04 39 55 31.3200 -97.3300 251.000 30.0 126.408 4.110 -999.990 -999.990 1.264 ..P WKT 2010 09 26 04 44 55 31.3200 -97.3300 251.000 122.0 121.627 5.990 -999.990 -999.990 1.216 ..P WKT 2010 09 26 04 49 55 31.3200 -97.3300 251.000 457.0 98.401 4.310 -999.990 -999.990 0.984 ..P WKT 2010 09 26 05 04 55 31.3200 -97.3300 251.000 30.0 119.454 4.640 -999.990 -999.990 1.195 ..P WKT 2010 09 26 05 09 55 31.3200 -97.3300 251.000 122.0 128.928 5.220 -999.990 -999.990 1.289 ..P WKT 2010 09 26 05 14 55 31.3200 -97.3300 251.000 457.0 93.260 4.380 -999.990 -999.990 0.933 ..P WKT 2010 09 26 05 19 55 31.3200 -97.3300 251.000 30.0 121.176 4.720 -999.990 -999.990 1.212 ..P WKT 2010 09 26 05 24 55 31.3200 -97.3300 251.000 122.0 136.706 4.920 -999.990 -999.990 1.367 ..P WKT 2010 09 26 05 29 55 31.3200 -97.3300 251.000 457.0 109.297 5.940 -999.990 -999.990 1.093 ..P WKT 2010 09 26 05 39 55 31.3200 -97.3300 251.000 30.0 131.055 5.910 -999.990 -999.990 1.311 ..P WKT 2010 09 26 05 44 55 31.3200 -97.3300 251.000 122.0 137.284 5.300 -999.990 -999.990 1.373 ..P WKT 2010 09 26 05 49 55 31.3200 -97.3300 251.000 457.0 91.774 5.310 -999.990 -999.990 0.918 ..P WKT 2010 09 26 05 54 55 31.3200 -97.3300 251.000 30.0 129.926 4.720 -999.990 -999.990 1.299 ..P WKT 2010 09 26 05 59 55 31.3200 -97.3300 251.000 122.0 140.283 4.270 -999.990 -999.990 1.403 ..P WKT 2010 09 26 06 04 55 31.3200 -97.3300 251.000 457.0 97.253 4.400 -999.990 -999.990 0.973 ..P WKT 2010 09 26 06 14 55 31.3200 -97.3300 251.000 30.0 121.406 4.280 -999.990 -999.990 1.214 ..P WKT 2010 09 26 06 19 55 31.3200 -97.3300 251.000 122.0 139.878 5.570 -999.990 -999.990 1.399 ..P WKT 2010 09 26 06 24 55 31.3200 -97.3300 251.000 457.0 85.709 4.200 -999.990 -999.990 0.857 ..P WKT 2010 09 26 06 29 55 31.3200 -97.3300 251.000 30.0 123.993 4.850 -999.990 -999.990 1.240 ..P WKT 2010 09 26 06 34 55 31.3200 -97.3300 251.000 122.0 147.967 4.280 -999.990 -999.990 1.480 ..P WKT 2010 09 26 06 39 55 31.3200 -97.3300 251.000 457.0 98.478 4.760 -999.990 -999.990 0.985 ..P WKT 2010 09 26 06 49 55 31.3200 -97.3300 251.000 30.0 129.583 4.250 -999.990 -999.990 1.296 ..P WKT 2010 09 26 06 54 55 31.3200 -97.3300 251.000 122.0 151.295 4.510 -999.990 -999.990 1.513 ..P WKT 2010 09 26 06 59 55 31.3200 -97.3300 251.000 457.0 92.124 4.950 -999.990 -999.990 0.921 ..P WKT 2010 09 26 07 04 55 31.3200 -97.3300 251.000 30.0 125.527 5.130 -999.990 -999.990 1.255 ..P WKT 2010 09 26 07 09 55 31.3200 -97.3300 251.000 122.0 165.531 4.560 -999.990 -999.990 1.655 ..P WKT 2010 09 26 07 14 55 31.3200 -97.3300 251.000 457.0 96.049 4.550 -999.990 -999.990 0.960 ..P WKT 2010 09 26 07 24 55 31.3200 -97.3300 251.000 30.0 128.012 4.450 -999.990 -999.990 1.280 ..P WKT 2010 09 26 07 29 55 31.3200 -97.3300 251.000 122.0 185.164 4.850 -999.990 -999.990 1.852 ..P WKT 2010 09 26 07 34 55 31.3200 -97.3300 251.000 457.0 91.995 5.600 -999.990 -999.990 0.920 ..P WKT 2010 09 26 07 39 55 31.3200 -97.3300 251.000 30.0 129.341 5.290 -999.990 -999.990 1.293 ..P WKT 2010 09 26 07 44 55 31.3200 -97.3300 251.000 122.0 176.862 5.130 -999.990 -999.990 1.769 ..P WKT 2010 09 26 07 49 55 31.3200 -97.3300 251.000 457.0 95.939 5.140 -999.990 -999.990 0.959 ..P WKT 2010 09 26 07 59 55 31.3200 -97.3300 251.000 30.0 132.984 4.630 -999.990 -999.990 1.330 ..P WKT 2010 09 26 08 04 55 31.3200 -97.3300 251.000 122.0 168.439 5.560 -999.990 -999.990 1.684 ..P WKT 2010 09 26 08 09 55 31.3200 -97.3300 251.000 457.0 97.463 5.400 -999.990 -999.990 0.975 ..P WKT 2010 09 26 08 14 55 31.3200 -97.3300 251.000 30.0 136.767 5.410 -999.990 -999.990 1.368 ..P WKT 2010 09 26 08 19 55 31.3200 -97.3300 251.000 122.0 166.169 6.010 -999.990 -999.990 1.662 ..P WKT 2010 09 26 08 24 55 31.3200 -97.3300 251.000 457.0 91.900 4.710 -999.990 -999.990 0.919 ..P WKT 2010 09 26 08 34 55 31.3200 -97.3300 251.000 30.0 134.713 5.280 -999.990 -999.990 1.347 ..P WKT 2010 09 26 08 39 55 31.3200 -97.3300 251.000 122.0 147.300 5.940 -999.990 -999.990 1.473 ..P WKT 2010 09 26 08 44 55 31.3200 -97.3300 251.000 457.0 100.495 5.360 -999.990 -999.990 1.005 ..P WKT 2010 09 26 08 49 55 31.3200 -97.3300 251.000 30.0 137.553 5.500 -999.990 -999.990 1.376 ..P WKT 2010 09 26 08 54 55 31.3200 -97.3300 251.000 122.0 166.359 5.340 -999.990 -999.990 1.664 ..P WKT 2010 09 26 08 59 55 31.3200 -97.3300 251.000 457.0 95.639 5.430 -999.990 -999.990 0.956 ..P WKT 2010 09 26 09 09 55 31.3200 -97.3300 251.000 30.0 135.263 5.210 -999.990 -999.990 1.353 ..P WKT 2010 09 26 09 14 55 31.3200 -97.3300 251.000 122.0 177.970 5.190 -999.990 -999.990 1.780 ..P WKT 2010 09 26 09 19 55 31.3200 -97.3300 251.000 457.0 95.593 5.710 -999.990 -999.990 0.956 ..P WKT 2010 09 26 09 24 55 31.3200 -97.3300 251.000 30.0 130.601 5.520 -999.990 -999.990 1.306 ..P WKT 2010 09 26 09 29 55 31.3200 -97.3300 251.000 122.0 179.352 5.490 -999.990 -999.990 1.794 ..P WKT 2010 09 26 09 34 55 31.3200 -97.3300 251.000 457.0 98.081 5.600 -999.990 -999.990 0.981 ..P WKT 2010 09 26 09 44 55 31.3200 -97.3300 251.000 30.0 140.427 5.580 -999.990 -999.990 1.404 ..P WKT 2010 09 26 09 49 55 31.3200 -97.3300 251.000 122.0 170.305 5.930 -999.990 -999.990 1.703 ..P WKT 2010 09 26 09 54 55 31.3200 -97.3300 251.000 457.0 96.563 5.580 -999.990 -999.990 0.966 ..P WKT 2010 09 26 09 59 55 31.3200 -97.3300 251.000 30.0 130.701 5.530 -999.990 -999.990 1.307 ..P WKT 2010 09 26 10 04 55 31.3200 -97.3300 251.000 122.0 156.316 5.190 -999.990 -999.990 1.563 ..P WKT 2010 09 26 10 09 55 31.3200 -97.3300 251.000 457.0 114.598 5.440 -999.990 -999.990 1.146 ..P WKT 2010 09 26 10 19 55 31.3200 -97.3300 251.000 30.0 131.926 5.830 -999.990 -999.990 1.319 ..P WKT 2010 09 26 10 24 55 31.3200 -97.3300 251.000 122.0 178.740 5.810 -999.990 -999.990 1.787 ..P WKT 2010 09 26 10 29 55 31.3200 -97.3300 251.000 457.0 114.118 5.720 -999.990 -999.990 1.141 ..P WKT 2010 09 26 10 34 55 31.3200 -97.3300 251.000 30.0 127.816 5.750 -999.990 -999.990 1.278 ..P WKT 2010 09 26 10 39 55 31.3200 -97.3300 251.000 122.0 163.497 7.290 -999.990 -999.990 1.635 ..P WKT 2010 09 26 10 44 55 31.3200 -97.3300 251.000 457.0 111.796 6.870 -999.990 -999.990 1.118 ..P WKT 2010 09 26 10 54 55 31.3200 -97.3300 251.000 30.0 121.055 8.000 -999.990 -999.990 1.211 ..P WKT 2010 09 26 10 59 55 31.3200 -97.3300 251.000 122.0 136.537 6.410 -999.990 -999.990 1.365 ..P WKT 2010 09 26 11 04 55 31.3200 -97.3300 251.000 457.0 95.695 6.050 -999.990 -999.990 0.957 ..P WKT 2010 09 26 11 09 55 31.3200 -97.3300 251.000 30.0 122.991 5.950 -999.990 -999.990 1.230 ..P WKT 2010 09 26 11 14 55 31.3200 -97.3300 251.000 122.0 138.746 6.470 -999.990 -999.990 1.387 ..P WKT 2010 09 26 11 19 55 31.3200 -97.3300 251.000 457.0 99.281 5.480 -999.990 -999.990 0.993 ..P WKT 2010 09 26 11 29 55 31.3200 -97.3300 251.000 30.0 127.686 5.840 -999.990 -999.990 1.277 ..P WKT 2010 09 26 11 34 55 31.3200 -97.3300 251.000 122.0 165.881 5.690 -999.990 -999.990 1.659 ..P WKT 2010 09 26 11 39 55 31.3200 -97.3300 251.000 457.0 121.667 6.010 -999.990 -999.990 1.217 ..P WKT 2010 09 26 11 44 55 31.3200 -97.3300 251.000 30.0 132.667 5.380 -999.990 -999.990 1.327 ..P WKT 2010 09 26 11 49 55 31.3200 -97.3300 251.000 122.0 150.533 5.760 -999.990 -999.990 1.505 ..P WKT 2010 09 26 12 09 55 31.3200 -97.3300 251.000 457.0 130.941 6.040 -999.990 -999.990 1.309 ..P WKT 2010 09 26 12 10 25 31.3200 -97.3300 251.000 457.0 109.481 5.770 -999.990 -999.990 1.095 ..P WKT 2010 09 26 12 10 55 31.3200 -97.3300 251.000 457.0 120.149 5.560 -999.990 -999.990 1.201 ..P WKT 2010 09 26 12 11 25 31.3200 -97.3300 251.000 457.0 107.202 7.640 -999.990 -999.990 1.072 ..P WKT 2010 09 26 12 11 55 31.3200 -97.3300 251.000 457.0 90.960 6.170 -999.990 -999.990 0.910 ..P WKT 2010 09 26 12 12 25 31.3200 -97.3300 251.000 457.0 101.628 8.180 -999.990 -999.990 1.016 ..P WKT 2010 09 26 12 12 55 31.3200 -97.3300 251.000 457.0 99.115 6.830 -999.990 -999.990 0.991 ..P WKT 2010 09 26 12 13 25 31.3200 -97.3300 251.000 457.0 91.111 5.950 -999.990 -999.990 0.911 ..P WKT 2010 09 26 12 13 55 31.3200 -97.3300 251.000 457.0 90.796 5.680 -999.990 -999.990 0.908 ..P WKT 2010 09 26 12 14 25 31.3200 -97.3300 251.000 457.0 86.911 6.040 -999.990 -999.990 0.869 ..P WKT 2010 09 26 12 14 55 31.3200 -97.3300 251.000 457.0 89.067 5.780 -999.990 -999.990 0.891 ..P WKT 2010 09 26 12 19 55 31.3200 -97.3300 251.000 30.0 125.169 5.670 -999.990 -999.990 1.252 ..P WKT 2010 09 26 12 24 55 31.3200 -97.3300 251.000 122.0 134.913 7.100 -999.990 -999.990 1.349 ..P WKT 2010 09 26 12 29 55 31.3200 -97.3300 251.000 457.0 93.327 7.140 -999.990 -999.990 0.933 ..P WKT 2010 09 26 12 34 55 31.3200 -97.3300 251.000 30.0 122.007 6.440 -999.990 -999.990 1.220 ..P WKT 2010 09 26 12 39 55 31.3200 -97.3300 251.000 122.0 131.472 6.370 -999.990 -999.990 1.315 ..P WKT 2010 09 26 12 44 55 31.3200 -97.3300 251.000 457.0 91.273 7.790 -999.990 -999.990 0.913 ..P WKT 2010 09 26 12 54 55 31.3200 -97.3300 251.000 30.0 122.748 6.840 -999.990 -999.990 1.227 ..P WKT 2010 09 26 12 59 55 31.3200 -97.3300 251.000 122.0 124.455 6.550 -999.990 -999.990 1.245 ..P WKT 2010 09 26 13 04 55 31.3200 -97.3300 251.000 457.0 97.639 6.500 -999.990 -999.990 0.976 ..P WKT 2010 09 26 13 09 55 31.3200 -97.3300 251.000 30.0 121.835 6.120 -999.990 -999.990 1.218 ..P WKT 2010 09 26 13 14 55 31.3200 -97.3300 251.000 122.0 134.783 6.080 -999.990 -999.990 1.348 ..P WKT 2010 09 26 13 19 55 31.3200 -97.3300 251.000 457.0 98.379 6.280 -999.990 -999.990 0.984 ..P WKT 2010 09 26 13 29 55 31.3200 -97.3300 251.000 30.0 129.520 5.700 -999.990 -999.990 1.295 ..P WKT 2010 09 26 13 34 55 31.3200 -97.3300 251.000 122.0 129.208 6.240 -999.990 -999.990 1.292 ..P WKT 2010 09 26 13 39 55 31.3200 -97.3300 251.000 457.0 105.877 5.540 -999.990 -999.990 1.059 ..P WKT 2010 09 26 13 44 55 31.3200 -97.3300 251.000 30.0 126.666 5.650 -999.990 -999.990 1.267 ..P WKT 2010 09 26 13 49 55 31.3200 -97.3300 251.000 122.0 133.890 5.800 -999.990 -999.990 1.339 ..P WKT 2010 09 26 13 54 55 31.3200 -97.3300 251.000 457.0 101.663 5.810 -999.990 -999.990 1.017 ..P WKT 2010 09 26 14 04 55 31.3200 -97.3300 251.000 30.0 121.823 5.860 -999.990 -999.990 1.218 ..P WKT 2010 09 26 14 09 55 31.3200 -97.3300 251.000 122.0 115.585 5.890 -999.990 -999.990 1.156 ..P WKT 2010 09 26 14 14 55 31.3200 -97.3300 251.000 457.0 96.479 5.540 -999.990 -999.990 0.965 ..P WKT 2010 09 26 14 19 55 31.3200 -97.3300 251.000 30.0 123.512 5.790 -999.990 -999.990 1.235 ..P WKT 2010 09 26 14 24 55 31.3200 -97.3300 251.000 122.0 119.329 5.860 -999.990 -999.990 1.193 ..P WKT 2010 09 26 14 29 55 31.3200 -97.3300 251.000 457.0 97.219 5.810 -999.990 -999.990 0.972 ..P WKT 2010 09 26 14 39 55 31.3200 -97.3300 251.000 30.0 114.060 5.900 -999.990 -999.990 1.141 ..P WKT 2010 09 26 14 44 55 31.3200 -97.3300 251.000 122.0 130.285 6.630 -999.990 -999.990 1.303 ..P WKT 2010 09 26 14 49 55 31.3200 -97.3300 251.000 457.0 104.236 5.790 -999.990 -999.990 1.042 ..P WKT 2010 09 26 14 54 55 31.3200 -97.3300 251.000 30.0 121.964 6.050 -999.990 -999.990 1.220 ..P WKT 2010 09 26 14 59 55 31.3200 -97.3300 251.000 122.0 121.907 5.730 -999.990 -999.990 1.219 ..P WKT 2010 09 26 15 04 55 31.3200 -97.3300 251.000 457.0 106.535 6.060 -999.990 -999.990 1.065 ..P WKT 2010 09 26 15 14 55 31.3200 -97.3300 251.000 30.0 120.138 5.610 -999.990 -999.990 1.201 ..P WKT 2010 09 26 15 19 55 31.3200 -97.3300 251.000 122.0 123.128 6.910 -999.990 -999.990 1.231 ..P WKT 2010 09 26 15 24 55 31.3200 -97.3300 251.000 457.0 120.787 5.570 -999.990 -999.990 1.208 ..P WKT 2010 09 26 15 29 55 31.3200 -97.3300 251.000 30.0 128.424 6.370 -999.990 -999.990 1.284 ..P WKT 2010 09 26 15 34 55 31.3200 -97.3300 251.000 122.0 121.574 5.930 -999.990 -999.990 1.216 ..P WKT 2010 09 26 15 39 55 31.3200 -97.3300 251.000 457.0 101.606 5.730 -999.990 -999.990 1.016 ..P WKT 2010 09 26 15 49 55 31.3200 -97.3300 251.000 30.0 130.852 5.790 -999.990 -999.990 1.309 ..P WKT 2010 09 26 15 54 55 31.3200 -97.3300 251.000 122.0 132.785 5.980 -999.990 -999.990 1.328 ..P WKT 2010 09 26 15 59 55 31.3200 -97.3300 251.000 457.0 113.137 6.450 -999.990 -999.990 1.131 ..P WKT 2010 09 26 16 04 55 31.3200 -97.3300 251.000 30.0 123.812 5.620 -999.990 -999.990 1.238 ..P WKT 2010 09 26 16 09 55 31.3200 -97.3300 251.000 122.0 130.116 5.520 -999.990 -999.990 1.301 ..P WKT 2010 09 26 16 14 55 31.3200 -97.3300 251.000 457.0 121.125 5.620 -999.990 -999.990 1.211 ..P WKT 2010 09 26 16 24 55 31.3200 -97.3300 251.000 30.0 121.754 6.610 -999.990 -999.990 1.218 ..P WKT 2010 09 26 16 29 55 31.3200 -97.3300 251.000 122.0 123.726 5.730 -999.990 -999.990 1.237 ..P WKT 2010 09 26 16 34 55 31.3200 -97.3300 251.000 457.0 121.057 5.740 -999.990 -999.990 1.211 ..P WKT 2010 09 26 16 39 55 31.3200 -97.3300 251.000 30.0 118.935 6.340 -999.990 -999.990 1.189 ..P WKT 2010 09 26 16 44 55 31.3200 -97.3300 251.000 122.0 125.273 5.970 -999.990 -999.990 1.253 ..P WKT 2010 09 26 16 49 55 31.3200 -97.3300 251.000 457.0 125.879 6.020 -999.990 -999.990 1.259 ..P WKT 2010 09 26 17 04 55 31.3200 -97.3300 251.000 30.0 123.620 6.010 -999.990 -999.990 1.236 ..P WKT 2010 09 26 17 09 55 31.3200 -97.3300 251.000 122.0 121.915 7.660 -999.990 -999.990 1.219 ..P WKT 2010 09 26 17 14 55 31.3200 -97.3300 251.000 457.0 118.574 5.700 -999.990 -999.990 1.186 ..P WKT 2010 09 26 17 19 55 31.3200 -97.3300 251.000 30.0 119.597 5.860 -999.990 -999.990 1.196 ..P WKT 2010 09 26 17 24 55 31.3200 -97.3300 251.000 122.0 128.255 5.650 -999.990 -999.990 1.283 ..P WKT 2010 09 26 17 29 55 31.3200 -97.3300 251.000 457.0 123.551 6.670 -999.990 -999.990 1.236 ..P WKT 2010 09 26 17 39 55 31.3200 -97.3300 251.000 30.0 119.533 5.590 -999.990 -999.990 1.195 ..P WKT 2010 09 26 17 44 55 31.3200 -97.3300 251.000 122.0 124.850 6.050 -999.990 -999.990 1.248 ..P WKT 2010 09 26 17 49 55 31.3200 -97.3300 251.000 457.0 129.620 6.840 -999.990 -999.990 1.296 ..P WKT 2010 09 26 17 54 55 31.3200 -97.3300 251.000 30.0 120.086 6.040 -999.990 -999.990 1.201 ..P WKT 2010 09 26 17 59 55 31.3200 -97.3300 251.000 122.0 124.992 5.550 -999.990 -999.990 1.250 ..P WKT 2010 09 26 18 04 55 31.3200 -97.3300 251.000 457.0 130.715 6.430 -999.990 -999.990 1.307 ..P WKT 2010 09 26 18 14 55 31.3200 -97.3300 251.000 30.0 137.955 5.860 -999.990 -999.990 1.380 ..P WKT 2010 09 26 18 19 55 31.3200 -97.3300 251.000 122.0 145.735 5.880 -999.990 -999.990 1.457 ..P WKT 2010 09 26 18 24 55 31.3200 -97.3300 251.000 457.0 132.413 6.390 -999.990 -999.990 1.324 ..P WKT 2010 09 26 18 29 55 31.3200 -97.3300 251.000 30.0 137.470 6.100 -999.990 -999.990 1.375 ..P WKT 2010 09 26 18 34 55 31.3200 -97.3300 251.000 122.0 136.946 5.910 -999.990 -999.990 1.369 ..P WKT 2010 09 26 18 39 55 31.3200 -97.3300 251.000 457.0 139.552 5.860 -999.990 -999.990 1.396 ..P WKT 2010 09 26 18 49 55 31.3200 -97.3300 251.000 30.0 134.479 6.680 -999.990 -999.990 1.345 ..P WKT 2010 09 26 18 54 55 31.3200 -97.3300 251.000 122.0 146.395 5.870 -999.990 -999.990 1.464 ..P WKT 2010 09 26 18 59 55 31.3200 -97.3300 251.000 457.0 142.527 5.850 -999.990 -999.990 1.425 ..P WKT 2010 09 26 19 04 55 31.3200 -97.3300 251.000 30.0 136.348 5.860 -999.990 -999.990 1.363 ..P WKT 2010 09 26 19 09 55 31.3200 -97.3300 251.000 122.0 142.275 7.450 -999.990 -999.990 1.423 ..P WKT 2010 09 26 19 14 55 31.3200 -97.3300 251.000 457.0 142.352 5.830 -999.990 -999.990 1.424 ..P WKT 2010 09 26 19 24 55 31.3200 -97.3300 251.000 30.0 134.429 5.790 -999.990 -999.990 1.344 ..P WKT 2010 09 26 19 29 55 31.3200 -97.3300 251.000 122.0 140.974 5.760 -999.990 -999.990 1.410 ..P WKT 2010 09 26 19 34 55 31.3200 -97.3300 251.000 457.0 135.013 5.810 -999.990 -999.990 1.350 ..P WKT 2010 09 26 19 39 55 31.3200 -97.3300 251.000 30.0 131.228 6.500 -999.990 -999.990 1.312 ..P WKT 2010 09 26 19 44 55 31.3200 -97.3300 251.000 122.0 129.618 6.310 -999.990 -999.990 1.296 ..P WKT 2010 09 26 19 49 55 31.3200 -97.3300 251.000 457.0 125.834 6.080 -999.990 -999.990 1.258 ..P WKT 2010 09 26 19 59 55 31.3200 -97.3300 251.000 30.0 127.002 5.630 -999.990 -999.990 1.270 ..P WKT 2010 09 26 20 04 55 31.3200 -97.3300 251.000 122.0 119.998 5.970 -999.990 -999.990 1.200 ..P WKT 2010 09 26 20 09 55 31.3200 -97.3300 251.000 457.0 122.504 6.500 -999.990 -999.990 1.225 ..P WKT 2010 09 26 20 14 55 31.3200 -97.3300 251.000 30.0 120.120 6.140 -999.990 -999.990 1.201 ..P WKT 2010 09 26 20 19 55 31.3200 -97.3300 251.000 122.0 124.255 5.670 -999.990 -999.990 1.243 ..P WKT 2010 09 26 20 24 55 31.3200 -97.3300 251.000 457.0 132.462 6.600 -999.990 -999.990 1.325 ..P WKT 2010 09 26 20 34 55 31.3200 -97.3300 251.000 30.0 122.690 6.000 -999.990 -999.990 1.227 ..P WKT 2010 09 26 20 39 55 31.3200 -97.3300 251.000 122.0 128.064 5.940 -999.990 -999.990 1.281 ..P WKT 2010 09 26 20 44 55 31.3200 -97.3300 251.000 457.0 123.936 5.950 -999.990 -999.990 1.239 ..P WKT 2010 09 26 20 49 55 31.3200 -97.3300 251.000 30.0 126.323 5.740 -999.990 -999.990 1.263 ..P WKT 2010 09 26 20 54 55 31.3200 -97.3300 251.000 122.0 135.222 6.000 -999.990 -999.990 1.352 ..P WKT 2010 09 26 20 59 55 31.3200 -97.3300 251.000 457.0 125.939 7.000 -999.990 -999.990 1.259 ..P WKT 2010 09 26 21 09 55 31.3200 -97.3300 251.000 30.0 120.420 6.210 -999.990 -999.990 1.204 ..P WKT 2010 09 26 21 14 55 31.3200 -97.3300 251.000 122.0 129.336 5.850 -999.990 -999.990 1.293 ..P WKT 2010 09 26 21 19 55 31.3200 -97.3300 251.000 457.0 121.704 6.060 -999.990 -999.990 1.217 ..P WKT 2010 09 26 21 24 55 31.3200 -97.3300 251.000 30.0 120.990 6.280 -999.990 -999.990 1.210 ..P WKT 2010 09 26 21 29 55 31.3200 -97.3300 251.000 122.0 120.411 6.020 -999.990 -999.990 1.204 ..P WKT 2010 09 26 21 34 55 31.3200 -97.3300 251.000 457.0 121.730 5.950 -999.990 -999.990 1.217 ..P WKT 2010 09 26 21 44 55 31.3200 -97.3300 251.000 30.0 127.622 6.530 -999.990 -999.990 1.276 ..P WKT 2010 09 26 21 49 55 31.3200 -97.3300 251.000 122.0 124.604 5.950 -999.990 -999.990 1.246 ..P WKT 2010 09 26 21 54 55 31.3200 -97.3300 251.000 457.0 119.688 6.060 -999.990 -999.990 1.197 ..P WKT 2010 09 26 21 59 55 31.3200 -97.3300 251.000 30.0 128.730 6.310 -999.990 -999.990 1.287 ..P WKT 2010 09 26 22 04 55 31.3200 -97.3300 251.000 122.0 118.262 6.540 -999.990 -999.990 1.183 ..P WKT 2010 09 26 22 09 55 31.3200 -97.3300 251.000 457.0 119.174 6.080 -999.990 -999.990 1.192 ..P WKT 2010 09 26 22 19 55 31.3200 -97.3300 251.000 30.0 121.792 5.750 -999.990 -999.990 1.218 ..P WKT 2010 09 26 22 24 55 31.3200 -97.3300 251.000 122.0 117.944 6.070 -999.990 -999.990 1.179 ..P WKT 2010 09 26 22 29 55 31.3200 -97.3300 251.000 457.0 124.253 6.390 -999.990 -999.990 1.243 ..P WKT 2010 09 26 22 34 55 31.3200 -97.3300 251.000 30.0 115.939 6.280 -999.990 -999.990 1.159 ..P WKT 2010 09 26 22 39 55 31.3200 -97.3300 251.000 122.0 108.032 5.860 -999.990 -999.990 1.080 ..P WKT 2010 09 26 22 44 55 31.3200 -97.3300 251.000 457.0 108.926 6.860 -999.990 -999.990 1.089 ..P WKT 2010 09 26 22 54 55 31.3200 -97.3300 251.000 30.0 111.369 5.900 -999.990 -999.990 1.114 ..P WKT 2010 09 26 22 59 55 31.3200 -97.3300 251.000 122.0 116.707 5.880 -999.990 -999.990 1.167 ..P WKT 2010 09 26 23 04 55 31.3200 -97.3300 251.000 457.0 112.845 5.980 -999.990 -999.990 1.128 ..P WKT 2010 09 26 23 09 55 31.3200 -97.3300 251.000 30.0 112.636 5.830 -999.990 -999.990 1.126 ..P WKT 2010 09 26 23 14 55 31.3200 -97.3300 251.000 122.0 115.808 6.610 -999.990 -999.990 1.158 ..P WKT 2010 09 26 23 19 55 31.3200 -97.3300 251.000 457.0 122.361 5.730 -999.990 -999.990 1.224 ..P WKT 2010 09 26 23 29 55 31.3200 -97.3300 251.000 30.0 122.506 6.080 -999.990 -999.990 1.225 ..P WKT 2010 09 26 23 34 55 31.3200 -97.3300 251.000 122.0 125.024 6.070 -999.990 -999.990 1.250 ..P WKT 2010 09 26 23 39 55 31.3200 -97.3300 251.000 457.0 121.323 5.770 -999.990 -999.990 1.213 ..P WKT 2010 09 26 23 44 55 31.3200 -97.3300 251.000 30.0 119.515 5.960 -999.990 -999.990 1.195 ..P WKT 2010 09 26 23 49 55 31.3200 -97.3300 251.000 122.0 122.033 6.450 -999.990 -999.990 1.220 ..P WKT 2010 09 27 00 09 55 31.3200 -97.3300 251.000 457.0 123.745 5.760 -999.990 -999.990 1.237 ..P WKT 2010 09 27 00 10 25 31.3200 -97.3300 251.000 457.0 126.126 5.880 -999.990 -999.990 1.261 ..P WKT 2010 09 27 00 10 55 31.3200 -97.3300 251.000 457.0 126.075 5.800 -999.990 -999.990 1.261 ..P WKT 2010 09 27 00 11 25 31.3200 -97.3300 251.000 457.0 124.674 6.100 -999.990 -999.990 1.247 ..P WKT 2010 09 27 00 11 55 31.3200 -97.3300 251.000 457.0 121.379 5.760 -999.990 -999.990 1.214 ..P WKT 2010 09 27 00 12 25 31.3200 -97.3300 251.000 457.0 121.868 5.720 -999.990 -999.990 1.219 ..P WKT 2010 09 27 00 12 55 31.3200 -97.3300 251.000 457.0 125.061 6.310 -999.990 -999.990 1.251 ..P WKT 2010 09 27 00 13 25 31.3200 -97.3300 251.000 457.0 126.362 6.470 -999.990 -999.990 1.264 ..P WKT 2010 09 27 00 13 55 31.3200 -97.3300 251.000 457.0 123.067 5.820 -999.990 -999.990 1.231 ..P WKT 2010 09 27 00 14 25 31.3200 -97.3300 251.000 457.0 122.746 5.800 -999.990 -999.990 1.227 ..P WKT 2010 09 27 00 14 55 31.3200 -97.3300 251.000 457.0 123.506 5.950 -999.990 -999.990 1.235 ..P WKT 2010 09 27 00 19 55 31.3200 -97.3300 251.000 30.0 122.725 6.370 -999.990 -999.990 1.227 ..P WKT 2010 09 27 00 24 55 31.3200 -97.3300 251.000 122.0 120.864 6.020 -999.990 -999.990 1.209 ..P WKT 2010 09 27 00 29 55 31.3200 -97.3300 251.000 457.0 117.650 6.250 -999.990 -999.990 1.177 ..P WKT 2010 09 27 00 34 55 31.3200 -97.3300 251.000 30.0 116.870 5.950 -999.990 -999.990 1.169 ..P WKT 2010 09 27 00 39 55 31.3200 -97.3300 251.000 122.0 116.359 5.850 -999.990 -999.990 1.164 ..P WKT 2010 09 27 00 44 55 31.3200 -97.3300 251.000 457.0 113.956 5.750 -999.990 -999.990 1.140 ..P WKT 2010 09 27 00 54 55 31.3200 -97.3300 251.000 30.0 123.097 5.810 -999.990 -999.990 1.231 ..P WKT 2010 09 27 00 59 55 31.3200 -97.3300 251.000 122.0 116.249 6.270 -999.990 -999.990 1.162 ..P WKT 2010 09 27 01 04 55 31.3200 -97.3300 251.000 457.0 116.434 6.010 -999.990 -999.990 1.164 ..P WKT 2010 09 27 01 09 55 31.3200 -97.3300 251.000 30.0 121.759 5.730 -999.990 -999.990 1.218 ..P WKT 2010 09 27 01 14 55 31.3200 -97.3300 251.000 122.0 122.757 5.900 -999.990 -999.990 1.228 ..P WKT 2010 09 27 01 19 55 31.3200 -97.3300 251.000 457.0 115.366 6.780 -999.990 -999.990 1.154 ..P WKT 2010 09 27 01 29 55 31.3200 -97.3300 251.000 30.0 122.366 5.630 -999.990 -999.990 1.224 ..P WKT 2010 09 27 01 34 55 31.3200 -97.3300 251.000 122.0 120.793 5.760 -999.990 -999.990 1.208 ..P WKT 2010 09 27 01 39 55 31.3200 -97.3300 251.000 457.0 122.060 6.210 -999.990 -999.990 1.221 ..P WKT 2010 09 27 01 44 55 31.3200 -97.3300 251.000 30.0 124.411 6.110 -999.990 -999.990 1.244 ..P WKT 2010 09 27 01 49 55 31.3200 -97.3300 251.000 122.0 123.244 6.560 -999.990 -999.990 1.232 ..P WKT 2010 09 27 01 54 55 31.3200 -97.3300 251.000 457.0 120.858 6.610 -999.990 -999.990 1.209 ..P WKT 2010 09 27 02 04 55 31.3200 -97.3300 251.000 30.0 121.964 7.050 -999.990 -999.990 1.220 ..P WKT 2010 09 27 02 09 55 31.3200 -97.3300 251.000 122.0 123.426 6.540 -999.990 -999.990 1.234 ..P WKT 2010 09 27 02 14 55 31.3200 -97.3300 251.000 457.0 115.951 6.140 -999.990 -999.990 1.160 ..P WKT 2010 09 27 02 19 55 31.3200 -97.3300 251.000 30.0 121.070 5.560 -999.990 -999.990 1.211 ..P WKT 2010 09 27 02 24 55 31.3200 -97.3300 251.000 122.0 117.657 6.320 -999.990 -999.990 1.177 ..P WKT 2010 09 27 02 29 55 31.3200 -97.3300 251.000 457.0 119.797 5.240 -999.990 -999.990 1.198 ..P WKT 2010 09 27 02 39 55 31.3200 -97.3300 251.000 30.0 124.347 5.300 -999.990 -999.990 1.243 ..P WKT 2010 09 27 02 44 55 31.3200 -97.3300 251.000 122.0 125.133 5.540 -999.990 -999.990 1.251 ..P WKT 2010 09 27 02 49 55 31.3200 -97.3300 251.000 457.0 119.551 5.500 -999.990 -999.990 1.196 ..P WKT 2010 09 27 02 54 55 31.3200 -97.3300 251.000 30.0 117.221 5.280 -999.990 -999.990 1.172 ..P WKT 2010 09 27 02 59 55 31.3200 -97.3300 251.000 122.0 128.440 5.500 -999.990 -999.990 1.284 ..P WKT 2010 09 27 03 04 55 31.3200 -97.3300 251.000 457.0 115.133 5.460 -999.990 -999.990 1.151 ..P WKT 2010 09 27 03 14 55 31.3200 -97.3300 251.000 30.0 123.112 5.370 -999.990 -999.990 1.231 ..P WKT 2010 09 27 03 19 55 31.3200 -97.3300 251.000 122.0 128.953 5.180 -999.990 -999.990 1.290 ..P WKT 2010 09 27 03 24 55 31.3200 -97.3300 251.000 457.0 120.968 5.870 -999.990 -999.990 1.210 ..P WKT 2010 09 27 03 29 55 31.3200 -97.3300 251.000 30.0 122.741 5.590 -999.990 -999.990 1.227 ..P WKT 2010 09 27 03 34 55 31.3200 -97.3300 251.000 122.0 137.801 6.170 -999.990 -999.990 1.378 ..P WKT 2010 09 27 03 39 55 31.3200 -97.3300 251.000 457.0 114.088 4.950 -999.990 -999.990 1.141 ..P WKT 2010 09 27 03 49 55 31.3200 -97.3300 251.000 30.0 127.127 4.830 -999.990 -999.990 1.271 ..P WKT 2010 09 27 03 54 55 31.3200 -97.3300 251.000 122.0 122.936 4.850 -999.990 -999.990 1.229 ..P WKT 2010 09 27 03 59 55 31.3200 -97.3300 251.000 457.0 129.593 4.740 -999.990 -999.990 1.296 ..P WKT 2010 09 27 04 04 55 31.3200 -97.3300 251.000 30.0 122.417 4.680 -999.990 -999.990 1.224 ..P WKT 2010 09 27 04 09 55 31.3200 -97.3300 251.000 122.0 116.053 4.730 -999.990 -999.990 1.161 ..P WKT 2010 09 27 04 14 55 31.3200 -97.3300 251.000 457.0 148.484 5.550 -999.990 -999.990 1.485 ..P WKT 2010 09 27 04 24 55 31.3200 -97.3300 251.000 30.0 115.098 5.690 -999.990 -999.990 1.151 ..P WKT 2010 09 27 04 29 55 31.3200 -97.3300 251.000 122.0 107.607 4.610 -999.990 -999.990 1.076 ..P WKT 2010 09 27 04 34 55 31.3200 -97.3300 251.000 457.0 113.414 4.680 -999.990 -999.990 1.134 ..P WKT 2010 09 27 04 39 55 31.3200 -97.3300 251.000 30.0 108.637 4.900 -999.990 -999.990 1.086 ..P WKT 2010 09 27 04 44 55 31.3200 -97.3300 251.000 122.0 108.202 4.790 -999.990 -999.990 1.082 ..P WKT 2010 09 27 04 49 55 31.3200 -97.3300 251.000 457.0 115.367 4.880 -999.990 -999.990 1.154 ..P WKT 2010 09 27 05 04 55 31.3200 -97.3300 251.000 30.0 101.451 5.260 -999.990 -999.990 1.015 ..P WKT 2010 09 27 05 09 55 31.3200 -97.3300 251.000 122.0 111.001 5.090 -999.990 -999.990 1.110 ..P WKT 2010 09 27 05 14 55 31.3200 -97.3300 251.000 457.0 113.356 4.640 -999.990 -999.990 1.134 ..P WKT 2010 09 27 05 19 55 31.3200 -97.3300 251.000 30.0 109.738 5.240 -999.990 -999.990 1.097 ..P WKT 2010 09 27 05 24 55 31.3200 -97.3300 251.000 122.0 107.069 4.870 -999.990 -999.990 1.071 ..P WKT 2010 09 27 05 29 55 31.3200 -97.3300 251.000 457.0 111.597 4.520 -999.990 -999.990 1.116 ..P WKT 2010 09 27 05 39 55 31.3200 -97.3300 251.000 30.0 103.428 4.490 -999.990 -999.990 1.034 ..P WKT 2010 09 27 05 44 55 31.3200 -97.3300 251.000 122.0 111.647 5.020 -999.990 -999.990 1.116 ..P WKT 2010 09 27 05 49 55 31.3200 -97.3300 251.000 457.0 119.323 4.680 -999.990 -999.990 1.193 ..P WKT 2010 09 27 05 54 55 31.3200 -97.3300 251.000 30.0 101.596 5.070 -999.990 -999.990 1.016 ..P WKT 2010 09 27 05 59 55 31.3200 -97.3300 251.000 122.0 109.273 4.420 -999.990 -999.990 1.093 ..P WKT 2010 09 27 06 04 55 31.3200 -97.3300 251.000 457.0 108.526 4.630 -999.990 -999.990 1.085 ..P WKT 2010 09 27 06 14 55 31.3200 -97.3300 251.000 30.0 102.200 4.090 -999.990 -999.990 1.022 ..P WKT 2010 09 27 06 19 55 31.3200 -97.3300 251.000 122.0 104.093 4.200 -999.990 -999.990 1.041 ..P WKT 2010 09 27 06 24 55 31.3200 -97.3300 251.000 457.0 106.395 4.630 -999.990 -999.990 1.064 ..P WKT 2010 09 27 06 29 55 31.3200 -97.3300 251.000 30.0 104.483 4.230 -999.990 -999.990 1.045 ..P WKT 2010 09 27 06 34 55 31.3200 -97.3300 251.000 122.0 100.532 4.260 -999.990 -999.990 1.005 ..P WKT 2010 09 27 06 39 55 31.3200 -97.3300 251.000 457.0 99.163 4.640 -999.990 -999.990 0.992 ..P WKT 2010 09 27 06 49 55 31.3200 -97.3300 251.000 30.0 108.778 5.180 -999.990 -999.990 1.088 ..P WKT 2010 09 27 06 54 55 31.3200 -97.3300 251.000 122.0 109.294 4.720 -999.990 -999.990 1.093 ..P WKT 2010 09 27 06 59 55 31.3200 -97.3300 251.000 457.0 104.507 4.440 -999.990 -999.990 1.045 ..P WKT 2010 09 27 07 04 55 31.3200 -97.3300 251.000 30.0 103.254 5.190 -999.990 -999.990 1.033 ..P WKT 2010 09 27 07 09 55 31.3200 -97.3300 251.000 122.0 115.738 4.800 -999.990 -999.990 1.157 ..P WKT 2010 09 27 07 14 55 31.3200 -97.3300 251.000 457.0 103.742 4.310 -999.990 -999.990 1.037 ..P WKT 2010 09 27 07 24 55 31.3200 -97.3300 251.000 30.0 109.475 4.080 -999.990 -999.990 1.095 ..P WKT 2010 09 27 07 29 55 31.3200 -97.3300 251.000 122.0 109.117 4.970 -999.990 -999.990 1.091 ..P WKT 2010 09 27 07 34 55 31.3200 -97.3300 251.000 457.0 110.936 4.920 -999.990 -999.990 1.109 ..P WKT 2010 09 27 07 39 55 31.3200 -97.3300 251.000 30.0 107.856 4.600 -999.990 -999.990 1.079 ..P WKT 2010 09 27 07 44 55 31.3200 -97.3300 251.000 122.0 112.667 4.040 -999.990 -999.990 1.127 ..P WKT 2010 09 27 07 49 55 31.3200 -97.3300 251.000 457.0 107.138 4.580 -999.990 -999.990 1.071 ..P WKT 2010 09 27 07 59 55 31.3200 -97.3300 251.000 30.0 105.293 4.370 -999.990 -999.990 1.053 ..P WKT 2010 09 27 08 04 55 31.3200 -97.3300 251.000 122.0 111.973 3.980 -999.990 -999.990 1.120 ..P WKT 2010 09 27 08 09 55 31.3200 -97.3300 251.000 457.0 101.503 4.230 -999.990 -999.990 1.015 ..P WKT 2010 09 27 08 14 55 31.3200 -97.3300 251.000 30.0 103.827 4.880 -999.990 -999.990 1.038 ..P WKT 2010 09 27 08 19 55 31.3200 -97.3300 251.000 122.0 106.969 4.150 -999.990 -999.990 1.070 ..P WKT 2010 09 27 08 24 55 31.3200 -97.3300 251.000 457.0 101.125 4.450 -999.990 -999.990 1.011 ..P WKT 2010 09 27 08 34 55 31.3200 -97.3300 251.000 30.0 105.697 3.890 -999.990 -999.990 1.057 ..P WKT 2010 09 27 08 39 55 31.3200 -97.3300 251.000 122.0 102.498 5.470 -999.990 -999.990 1.025 ..P WKT 2010 09 27 08 44 55 31.3200 -97.3300 251.000 457.0 99.570 4.290 -999.990 -999.990 0.996 ..P WKT 2010 09 27 08 49 55 31.3200 -97.3300 251.000 30.0 106.994 4.710 -999.990 -999.990 1.070 ..P WKT 2010 09 27 08 54 55 31.3200 -97.3300 251.000 122.0 108.425 5.010 -999.990 -999.990 1.084 ..P WKT 2010 09 27 08 59 55 31.3200 -97.3300 251.000 457.0 101.684 4.650 -999.990 -999.990 1.017 ..P WKT 2010 09 27 09 09 55 31.3200 -97.3300 251.000 30.0 105.461 4.220 -999.990 -999.990 1.055 ..P WKT 2010 09 27 09 14 55 31.3200 -97.3300 251.000 122.0 105.899 4.270 -999.990 -999.990 1.059 ..P WKT 2010 09 27 09 19 55 31.3200 -97.3300 251.000 457.0 97.754 3.940 -999.990 -999.990 0.978 ..P WKT 2010 09 27 09 24 55 31.3200 -97.3300 251.000 30.0 106.777 4.530 -999.990 -999.990 1.068 ..P WKT 2010 09 27 09 29 55 31.3200 -97.3300 251.000 122.0 110.896 3.920 -999.990 -999.990 1.109 ..P WKT 2010 09 27 09 34 55 31.3200 -97.3300 251.000 457.0 105.611 4.060 -999.990 -999.990 1.056 ..P WKT 2010 09 27 09 44 55 31.3200 -97.3300 251.000 30.0 114.375 3.970 -999.990 -999.990 1.144 ..P WKT 2010 09 27 09 49 55 31.3200 -97.3300 251.000 122.0 117.795 3.920 -999.990 -999.990 1.178 ..P WKT 2010 09 27 09 54 55 31.3200 -97.3300 251.000 457.0 107.444 5.710 -999.990 -999.990 1.074 ..P WKT 2010 09 27 09 59 55 31.3200 -97.3300 251.000 30.0 116.727 7.040 -999.990 -999.990 1.167 ..P WKT 2010 09 27 10 04 55 31.3200 -97.3300 251.000 122.0 113.874 5.640 -999.990 -999.990 1.139 ..P WKT 2010 09 27 10 09 55 31.3200 -97.3300 251.000 457.0 108.568 4.170 -999.990 -999.990 1.086 ..P WKT 2010 09 27 10 19 55 31.3200 -97.3300 251.000 30.0 119.091 4.540 -999.990 -999.990 1.191 ..P WKT 2010 09 27 10 24 55 31.3200 -97.3300 251.000 122.0 118.284 5.740 -999.990 -999.990 1.183 ..P WKT 2010 09 27 10 29 55 31.3200 -97.3300 251.000 457.0 105.747 6.260 -999.990 -999.990 1.057 ..P WKT 2010 09 27 10 34 55 31.3200 -97.3300 251.000 30.0 108.622 6.340 -999.990 -999.990 1.086 ..P WKT 2010 09 27 10 39 55 31.3200 -97.3300 251.000 122.0 114.771 5.870 -999.990 -999.990 1.148 ..P WKT 2010 09 27 10 44 55 31.3200 -97.3300 251.000 457.0 102.913 3.990 -999.990 -999.990 1.029 ..P WKT 2010 09 27 10 54 55 31.3200 -97.3300 251.000 30.0 115.312 4.560 -999.990 -999.990 1.153 ..P WKT 2010 09 27 10 59 55 31.3200 -97.3300 251.000 122.0 108.052 5.670 -999.990 -999.990 1.081 ..P WKT 2010 09 27 11 04 55 31.3200 -97.3300 251.000 457.0 103.793 6.200 -999.990 -999.990 1.038 ..P WKT 2010 09 27 11 09 55 31.3200 -97.3300 251.000 30.0 107.177 4.940 -999.990 -999.990 1.072 ..P WKT 2010 09 27 11 14 55 31.3200 -97.3300 251.000 122.0 110.015 3.410 -999.990 -999.990 1.100 ..P WKT 2010 09 27 11 19 55 31.3200 -97.3300 251.000 457.0 107.393 3.180 -999.990 -999.990 1.074 ..P WKT 2010 09 27 11 29 55 31.3200 -97.3300 251.000 30.0 117.088 3.750 -999.990 -999.990 1.171 ..P WKT 2010 09 27 11 34 55 31.3200 -97.3300 251.000 122.0 112.477 3.400 -999.990 -999.990 1.125 ..P WKT 2010 09 27 11 39 55 31.3200 -97.3300 251.000 457.0 105.408 3.340 -999.990 -999.990 1.054 ..P WKT 2010 09 27 11 44 55 31.3200 -97.3300 251.000 30.0 113.085 3.380 -999.990 -999.990 1.131 ..P WKT 2010 09 27 11 49 55 31.3200 -97.3300 251.000 122.0 109.565 3.630 -999.990 -999.990 1.096 ..P WKT 2010 09 27 12 09 55 31.3200 -97.3300 251.000 457.0 105.521 3.190 -999.990 -999.990 1.055 ..P WKT 2010 09 27 12 10 25 31.3200 -97.3300 251.000 457.0 108.746 3.650 -999.990 -999.990 1.087 ..P WKT 2010 09 27 12 10 55 31.3200 -97.3300 251.000 457.0 107.326 4.000 -999.990 -999.990 1.073 ..P WKT 2010 09 27 12 11 25 31.3200 -97.3300 251.000 457.0 102.627 3.550 -999.990 -999.990 1.026 ..P WKT 2010 09 27 12 11 55 31.3200 -97.3300 251.000 457.0 107.492 3.300 -999.990 -999.990 1.075 ..P WKT 2010 09 27 12 12 25 31.3200 -97.3300 251.000 457.0 112.084 3.530 -999.990 -999.990 1.121 ..P WKT 2010 09 27 12 12 55 31.3200 -97.3300 251.000 457.0 107.657 3.640 -999.990 -999.990 1.077 ..P WKT 2010 09 27 12 13 25 31.3200 -97.3300 251.000 457.0 105.691 3.290 -999.990 -999.990 1.057 ..P WKT 2010 09 27 12 13 55 31.3200 -97.3300 251.000 457.0 105.910 3.240 -999.990 -999.990 1.059 ..P WKT 2010 09 27 12 14 25 31.3200 -97.3300 251.000 457.0 101.757 3.150 -999.990 -999.990 1.018 ..P WKT 2010 09 27 12 14 55 31.3200 -97.3300 251.000 457.0 103.890 4.230 -999.990 -999.990 1.039 ..P WKT 2010 09 27 12 19 55 31.3200 -97.3300 251.000 30.0 108.817 3.150 -999.990 -999.990 1.088 ..P WKT 2010 09 27 12 24 55 31.3200 -97.3300 251.000 122.0 107.185 3.400 -999.990 -999.990 1.072 ..P WKT 2010 09 27 12 29 55 31.3200 -97.3300 251.000 457.0 106.101 3.150 -999.990 -999.990 1.061 ..P WKT 2010 09 27 12 34 55 31.3200 -97.3300 251.000 30.0 111.304 3.080 -999.990 -999.990 1.113 ..P WKT 2010 09 27 12 39 55 31.3200 -97.3300 251.000 122.0 109.672 3.290 -999.990 -999.990 1.097 ..P WKT 2010 09 27 12 44 55 31.3200 -97.3300 251.000 457.0 105.305 4.530 -999.990 -999.990 1.053 ..P WKT 2010 09 27 12 54 55 31.3200 -97.3300 251.000 30.0 117.984 3.900 -999.990 -999.990 1.180 ..P WKT 2010 09 27 12 59 55 31.3200 -97.3300 251.000 122.0 109.316 3.310 -999.990 -999.990 1.093 ..P WKT 2010 09 27 13 04 55 31.3200 -97.3300 251.000 457.0 104.614 3.200 -999.990 -999.990 1.046 ..P WKT 2010 09 27 13 09 55 31.3200 -97.3300 251.000 30.0 109.079 3.140 -999.990 -999.990 1.091 ..P WKT 2010 09 27 13 14 55 31.3200 -97.3300 251.000 122.0 106.155 3.640 -999.990 -999.990 1.062 ..P WKT 2010 09 27 13 19 55 31.3200 -97.3300 251.000 457.0 106.926 4.520 -999.990 -999.990 1.069 ..P WKT 2010 09 27 13 29 55 31.3200 -97.3300 251.000 30.0 110.738 3.170 -999.990 -999.990 1.107 ..P WKT 2010 09 27 13 34 55 31.3200 -97.3300 251.000 122.0 111.588 4.920 -999.990 -999.990 1.116 ..P WKT 2010 09 27 13 39 55 31.3200 -97.3300 251.000 457.0 113.945 3.670 -999.990 -999.990 1.139 ..P WKT 2010 09 27 13 44 55 31.3200 -97.3300 251.000 30.0 115.480 3.450 -999.990 -999.990 1.155 ..P WKT 2010 09 27 13 49 55 31.3200 -97.3300 251.000 122.0 115.921 3.570 -999.990 -999.990 1.159 ..P WKT 2010 09 27 13 54 55 31.3200 -97.3300 251.000 457.0 115.265 4.470 -999.990 -999.990 1.153 ..P WKT 2010 09 27 14 04 55 31.3200 -97.3300 251.000 30.0 112.934 4.990 -999.990 -999.990 1.129 ..P WKT 2010 09 27 14 09 55 31.3200 -97.3300 251.000 122.0 113.041 4.570 -999.990 -999.990 1.130 ..P WKT 2010 09 27 14 14 55 31.3200 -97.3300 251.000 457.0 108.075 3.910 -999.990 -999.990 1.081 ..P WKT 2010 09 27 14 19 55 31.3200 -97.3300 251.000 30.0 121.758 4.040 -999.990 -999.990 1.218 ..P WKT 2010 09 27 14 24 55 31.3200 -97.3300 251.000 122.0 124.198 5.230 -999.990 -999.990 1.242 ..P WKT 2010 09 27 14 29 55 31.3200 -97.3300 251.000 457.0 115.116 4.380 -999.990 -999.990 1.151 ..P WKT 2010 09 27 14 39 55 31.3200 -97.3300 251.000 30.0 121.173 4.630 -999.990 -999.990 1.212 ..P WKT 2010 09 27 14 44 55 31.3200 -97.3300 251.000 122.0 120.810 4.830 -999.990 -999.990 1.208 ..P WKT 2010 09 27 14 49 55 31.3200 -97.3300 251.000 457.0 118.527 4.120 -999.990 -999.990 1.185 ..P WKT 2010 09 27 14 54 55 31.3200 -97.3300 251.000 30.0 121.322 4.090 -999.990 -999.990 1.213 ..P WKT 2010 09 27 14 59 55 31.3200 -97.3300 251.000 122.0 117.939 3.960 -999.990 -999.990 1.179 ..P WKT 2010 09 27 15 04 55 31.3200 -97.3300 251.000 457.0 108.788 3.830 -999.990 -999.990 1.088 ..P WKT 2010 09 27 15 14 55 31.3200 -97.3300 251.000 30.0 113.594 4.550 -999.990 -999.990 1.136 ..P WKT 2010 09 27 15 19 55 31.3200 -97.3300 251.000 122.0 121.923 4.460 -999.990 -999.990 1.219 ..P WKT 2010 09 27 15 24 55 31.3200 -97.3300 251.000 457.0 115.967 4.160 -999.990 -999.990 1.160 ..P WKT 2010 09 27 15 29 55 31.3200 -97.3300 251.000 30.0 117.704 4.900 -999.990 -999.990 1.177 ..P WKT 2010 09 27 15 34 55 31.3200 -97.3300 251.000 122.0 122.190 4.370 -999.990 -999.990 1.222 ..P WKT 2010 09 27 15 39 55 31.3200 -97.3300 251.000 457.0 118.431 4.330 -999.990 -999.990 1.184 ..P WKT 2010 09 27 15 49 55 31.3200 -97.3300 251.000 30.0 119.983 4.190 -999.990 -999.990 1.200 ..P WKT 2010 09 27 15 54 55 31.3200 -97.3300 251.000 122.0 121.447 3.940 -999.990 -999.990 1.214 ..P WKT 2010 09 27 15 59 55 31.3200 -97.3300 251.000 457.0 117.135 4.390 -999.990 -999.990 1.171 ..P WKT 2010 09 27 16 04 55 31.3200 -97.3300 251.000 30.0 120.800 4.830 -999.990 -999.990 1.208 ..P WKT 2010 09 27 16 09 55 31.3200 -97.3300 251.000 122.0 120.889 3.930 -999.990 -999.990 1.209 ..P WKT 2010 09 27 16 14 55 31.3200 -97.3300 251.000 457.0 119.052 3.670 -999.990 -999.990 1.191 ..P WKT 2010 09 27 16 24 55 31.3200 -97.3300 251.000 30.0 116.674 3.310 -999.990 -999.990 1.167 ..P WKT 2010 09 27 16 29 55 31.3200 -97.3300 251.000 122.0 116.408 3.230 -999.990 -999.990 1.164 ..P WKT 2010 09 27 16 34 55 31.3200 -97.3300 251.000 457.0 114.215 3.620 -999.990 -999.990 1.142 ..P WKT 2010 09 27 16 39 55 31.3200 -97.3300 251.000 30.0 119.456 4.490 -999.990 -999.990 1.195 ..P WKT 2010 09 27 16 44 55 31.3200 -97.3300 251.000 122.0 115.611 4.040 -999.990 -999.990 1.156 ..P WKT 2010 09 27 16 49 55 31.3200 -97.3300 251.000 457.0 120.854 4.720 -999.990 -999.990 1.209 ..P WKT 2010 09 27 17 04 55 31.3200 -97.3300 251.000 30.0 112.515 3.730 -999.990 -999.990 1.125 ..P WKT 2010 09 27 17 09 55 31.3200 -97.3300 251.000 122.0 107.236 3.790 -999.990 -999.990 1.072 ..P WKT 2010 09 27 17 14 55 31.3200 -97.3300 251.000 457.0 110.638 4.000 -999.990 -999.990 1.106 ..P WKT 2010 09 27 17 19 55 31.3200 -97.3300 251.000 30.0 114.042 4.240 -999.990 -999.990 1.140 ..P WKT 2010 09 27 17 24 55 31.3200 -97.3300 251.000 122.0 115.240 3.790 -999.990 -999.990 1.152 ..P WKT 2010 09 27 17 29 55 31.3200 -97.3300 251.000 457.0 114.096 4.340 -999.990 -999.990 1.141 ..P WKT 2010 09 27 17 39 55 31.3200 -97.3300 251.000 30.0 117.353 3.940 -999.990 -999.990 1.174 ..P WKT 2010 09 27 17 44 55 31.3200 -97.3300 251.000 122.0 119.136 3.660 -999.990 -999.990 1.191 ..P WKT 2010 09 27 17 49 55 31.3200 -97.3300 251.000 457.0 115.401 4.130 -999.990 -999.990 1.154 ..P WKT 2010 09 27 17 54 55 31.3200 -97.3300 251.000 30.0 121.049 3.830 -999.990 -999.990 1.210 ..P WKT 2010 09 27 17 59 55 31.3200 -97.3300 251.000 122.0 118.142 3.790 -999.990 -999.990 1.181 ..P WKT 2010 09 27 18 04 55 31.3200 -97.3300 251.000 457.0 112.749 3.820 -999.990 -999.990 1.127 ..P WKT 2010 09 27 18 14 55 31.3200 -97.3300 251.000 30.0 120.006 3.400 -999.990 -999.990 1.200 ..P WKT 2010 09 27 18 19 55 31.3200 -97.3300 251.000 122.0 121.200 3.840 -999.990 -999.990 1.212 ..P WKT 2010 09 27 18 24 55 31.3200 -97.3300 251.000 457.0 117.698 5.490 -999.990 -999.990 1.177 ..P WKT 2010 09 27 18 29 55 31.3200 -97.3300 251.000 30.0 118.892 3.730 -999.990 -999.990 1.189 ..P WKT 2010 09 27 18 34 55 31.3200 -97.3300 251.000 122.0 121.054 4.910 -999.990 -999.990 1.211 ..P WKT 2010 09 27 18 39 55 31.3200 -97.3300 251.000 457.0 120.314 4.640 -999.990 -999.990 1.203 ..P WKT 2010 09 27 18 49 55 31.3200 -97.3300 251.000 30.0 119.407 4.740 -999.990 -999.990 1.194 ..P WKT 2010 09 27 18 54 55 31.3200 -97.3300 251.000 122.0 130.160 5.060 -999.990 -999.990 1.302 ..P WKT 2010 09 27 18 59 55 31.3200 -97.3300 251.000 457.0 114.095 4.660 -999.990 -999.990 1.141 ..P WKT 2010 09 27 19 04 55 31.3200 -97.3300 251.000 30.0 119.457 4.600 -999.990 -999.990 1.195 ..P WKT 2010 09 27 19 09 55 31.3200 -97.3300 251.000 122.0 122.886 5.040 -999.990 -999.990 1.229 ..P WKT 2010 09 27 19 14 55 31.3200 -97.3300 251.000 457.0 112.484 6.470 -999.990 -999.990 1.125 ..P WKT 2010 09 27 19 24 55 31.3200 -97.3300 251.000 30.0 114.143 4.910 -999.990 -999.990 1.141 ..P WKT 2010 09 27 19 29 55 31.3200 -97.3300 251.000 122.0 120.952 4.670 -999.990 -999.990 1.210 ..P WKT 2010 09 27 19 34 55 31.3200 -97.3300 251.000 457.0 115.308 5.280 -999.990 -999.990 1.153 ..P WKT 2010 09 27 19 39 55 31.3200 -97.3300 251.000 30.0 117.691 5.440 -999.990 -999.990 1.177 ..P WKT 2010 09 27 19 44 55 31.3200 -97.3300 251.000 122.0 117.582 5.300 -999.990 -999.990 1.176 ..P WKT 2010 09 27 19 49 55 31.3200 -97.3300 251.000 457.0 114.981 3.750 -999.990 -999.990 1.150 ..P WKT 2010 09 27 19 59 55 31.3200 -97.3300 251.000 30.0 119.709 3.600 -999.990 -999.990 1.197 ..P WKT 2010 09 27 20 04 55 31.3200 -97.3300 251.000 122.0 119.283 5.220 -999.990 -999.990 1.193 ..P WKT 2010 09 27 20 09 55 31.3200 -97.3300 251.000 457.0 122.183 3.980 -999.990 -999.990 1.222 ..P WKT 2010 09 27 20 14 55 31.3200 -97.3300 251.000 30.0 120.650 4.330 -999.990 -999.990 1.207 ..P WKT 2010 09 27 20 19 55 31.3200 -97.3300 251.000 122.0 122.996 5.640 -999.990 -999.990 1.230 ..P WKT 2010 09 27 20 24 55 31.3200 -97.3300 251.000 457.0 122.295 4.470 -999.990 -999.990 1.223 ..P WKT 2010 09 27 20 34 55 31.3200 -97.3300 251.000 30.0 122.970 4.940 -999.990 -999.990 1.230 ..P WKT 2010 09 27 20 39 55 31.3200 -97.3300 251.000 122.0 122.960 4.540 -999.990 -999.990 1.230 ..P WKT 2010 09 27 20 44 55 31.3200 -97.3300 251.000 457.0 123.506 4.150 -999.990 -999.990 1.235 ..P WKT 2010 09 27 20 49 55 31.3200 -97.3300 251.000 30.0 129.322 3.990 -999.990 -999.990 1.293 ..P WKT 2010 09 27 20 54 55 31.3200 -97.3300 251.000 122.0 130.423 5.540 -999.990 -999.990 1.304 ..P WKT 2010 09 27 20 59 55 31.3200 -97.3300 251.000 457.0 119.873 3.660 -999.990 -999.990 1.199 ..P WKT 2010 09 27 21 09 55 31.3200 -97.3300 251.000 30.0 127.862 4.290 -999.990 -999.990 1.279 ..P WKT 2010 09 27 21 14 55 31.3200 -97.3300 251.000 122.0 130.451 4.130 -999.990 -999.990 1.305 ..P WKT 2010 09 27 21 19 55 31.3200 -97.3300 251.000 457.0 124.158 4.250 -999.990 -999.990 1.242 ..P WKT 2010 09 27 21 24 55 31.3200 -97.3300 251.000 30.0 133.827 3.860 -999.990 -999.990 1.338 ..P WKT 2010 09 27 21 29 55 31.3200 -97.3300 251.000 122.0 131.697 4.030 -999.990 -999.990 1.317 ..P WKT 2010 09 27 21 34 55 31.3200 -97.3300 251.000 457.0 133.178 3.810 -999.990 -999.990 1.332 ..P WKT 2010 09 27 21 44 55 31.3200 -97.3300 251.000 30.0 137.171 4.110 -999.990 -999.990 1.372 ..P WKT 2010 09 27 21 49 55 31.3200 -97.3300 251.000 122.0 140.240 4.270 -999.990 -999.990 1.402 ..P WKT 2010 09 27 21 54 55 31.3200 -97.3300 251.000 457.0 144.422 4.550 -999.990 -999.990 1.444 ..P WKT 2010 09 27 21 59 55 31.3200 -97.3300 251.000 30.0 142.490 5.900 -999.990 -999.990 1.425 ..P WKT 2010 09 27 22 00 25 31.3200 -97.3300 251.000 30.0 137.280 4.600 -999.990 -999.990 1.373 ..P WKT 2010 09 27 22 00 55 31.3200 -97.3300 251.000 30.0 140.797 4.840 -999.990 -999.990 1.408 ..P WKT 2010 09 27 22 01 25 31.3200 -97.3300 251.000 30.0 140.646 4.480 -999.990 -999.990 1.406 ..P WKT 2010 09 27 22 01 55 31.3200 -97.3300 251.000 30.0 133.824 5.310 -999.990 -999.990 1.338 ..P WKT 2010 09 27 22 02 25 31.3200 -97.3300 251.000 30.0 139.231 4.930 -999.990 -999.990 1.392 ..P WKT 2010 09 27 22 02 55 31.3200 -97.3300 251.000 30.0 142.971 4.900 -999.990 -999.990 1.430 ..P WKT 2010 09 27 22 03 25 31.3200 -97.3300 251.000 30.0 141.151 5.090 -999.990 -999.990 1.412 ..P WKT 2010 09 27 22 03 55 31.3200 -97.3300 251.000 30.0 148.089 6.090 -999.990 -999.990 1.481 ..P WKT 2010 09 27 22 04 25 31.3200 -97.3300 251.000 30.0 143.073 5.230 -999.990 -999.990 1.431 ..P WKT 2010 09 27 22 04 55 31.3200 -97.3300 251.000 30.0 140.141 5.490 -999.990 -999.990 1.401 ..P WKT 2010 09 27 22 09 55 31.3200 -97.3300 251.000 457.0 142.935 4.940 -999.990 -999.990 1.429 ..P WKT 2010 09 27 22 19 55 31.3200 -97.3300 251.000 30.0 140.697 5.610 -999.990 -999.990 1.407 ..P WKT 2010 09 27 22 24 55 31.3200 -97.3300 251.000 122.0 137.195 4.810 -999.990 -999.990 1.372 ..P WKT 2010 09 27 22 29 55 31.3200 -97.3300 251.000 457.0 138.002 5.020 -999.990 -999.990 1.380 ..P WKT 2010 09 27 22 34 55 31.3200 -97.3300 251.000 30.0 138.810 4.600 -999.990 -999.990 1.388 ..P WKT 2010 09 27 22 39 55 31.3200 -97.3300 251.000 122.0 140.870 4.450 -999.990 -999.990 1.409 ..P WKT 2010 09 27 22 44 55 31.3200 -97.3300 251.000 457.0 137.226 5.220 -999.990 -999.990 1.372 ..P WKT 2010 09 27 22 54 55 31.3200 -97.3300 251.000 30.0 142.382 4.310 -999.990 -999.990 1.424 ..P WKT 2010 09 27 22 59 55 31.3200 -97.3300 251.000 122.0 129.469 4.500 -999.990 -999.990 1.295 ..P WKT 2010 09 27 23 04 55 31.3200 -97.3300 251.000 457.0 137.855 4.980 -999.990 -999.990 1.379 ..P WKT 2010 09 27 23 09 55 31.3200 -97.3300 251.000 30.0 135.380 5.000 -999.990 -999.990 1.354 ..P WKT 2010 09 27 23 14 55 31.3200 -97.3300 251.000 122.0 132.767 4.130 -999.990 -999.990 1.328 ..P WKT 2010 09 27 23 19 55 31.3200 -97.3300 251.000 457.0 138.232 4.370 -999.990 -999.990 1.382 ..P WKT 2010 09 27 23 29 55 31.3200 -97.3300 251.000 30.0 133.610 4.210 -999.990 -999.990 1.336 ..P WKT 2010 09 27 23 34 55 31.3200 -97.3300 251.000 122.0 135.504 5.000 -999.990 -999.990 1.355 ..P WKT 2010 09 27 23 39 55 31.3200 -97.3300 251.000 457.0 129.315 5.190 -999.990 -999.990 1.293 ..P WKT 2010 09 27 23 44 55 31.3200 -97.3300 251.000 30.0 126.469 4.650 -999.990 -999.990 1.265 ..P WKT 2010 09 27 23 49 55 31.3200 -97.3300 251.000 122.0 140.073 4.440 -999.990 -999.990 1.401 ..P WKT 2010 09 28 00 09 55 31.3200 -97.3300 251.000 457.0 131.496 5.080 -999.990 -999.990 1.315 ..P WKT 2010 09 28 00 10 25 31.3200 -97.3300 251.000 457.0 135.732 5.030 -999.990 -999.990 1.357 ..P WKT 2010 09 28 00 10 55 31.3200 -97.3300 251.000 457.0 132.716 5.080 -999.990 -999.990 1.327 ..P WKT 2010 09 28 00 11 25 31.3200 -97.3300 251.000 457.0 132.769 4.870 -999.990 -999.990 1.328 ..P WKT 2010 09 28 00 11 55 31.3200 -97.3300 251.000 457.0 137.841 5.150 -999.990 -999.990 1.378 ..P WKT 2010 09 28 00 12 25 31.3200 -97.3300 251.000 457.0 137.893 5.310 -999.990 -999.990 1.379 ..P WKT 2010 09 28 00 12 55 31.3200 -97.3300 251.000 457.0 137.667 4.800 -999.990 -999.990 1.377 ..P WKT 2010 09 28 00 13 25 31.3200 -97.3300 251.000 457.0 133.537 4.970 -999.990 -999.990 1.335 ..P WKT 2010 09 28 00 13 55 31.3200 -97.3300 251.000 457.0 135.263 5.140 -999.990 -999.990 1.353 ..P WKT 2010 09 28 00 14 25 31.3200 -97.3300 251.000 457.0 140.335 6.130 -999.990 -999.990 1.403 ..P WKT 2010 09 28 00 14 55 31.3200 -97.3300 251.000 457.0 136.761 4.930 -999.990 -999.990 1.368 ..P WKT 2010 09 28 00 19 55 31.3200 -97.3300 251.000 30.0 137.287 5.050 -999.990 -999.990 1.373 ..P WKT 2010 09 28 00 24 55 31.3200 -97.3300 251.000 122.0 138.370 4.660 -999.990 -999.990 1.384 ..P WKT 2010 09 28 00 29 55 31.3200 -97.3300 251.000 457.0 136.107 4.480 -999.990 -999.990 1.361 ..P WKT 2010 09 28 00 34 55 31.3200 -97.3300 251.000 30.0 133.844 4.130 -999.990 -999.990 1.338 ..P WKT 2010 09 28 00 39 55 31.3200 -97.3300 251.000 122.0 139.108 4.600 -999.990 -999.990 1.391 ..P WKT 2010 09 28 00 44 55 31.3200 -97.3300 251.000 457.0 138.519 4.680 -999.990 -999.990 1.385 ..P WKT 2010 09 28 00 54 55 31.3200 -97.3300 251.000 30.0 136.593 3.950 -999.990 -999.990 1.366 ..P WKT 2010 09 28 00 59 55 31.3200 -97.3300 251.000 122.0 136.651 4.290 -999.990 -999.990 1.367 ..P WKT 2010 09 28 01 04 55 31.3200 -97.3300 251.000 457.0 134.480 4.080 -999.990 -999.990 1.345 ..P WKT 2010 09 28 01 09 55 31.3200 -97.3300 251.000 30.0 128.408 4.150 -999.990 -999.990 1.284 ..P WKT 2010 09 28 01 14 55 31.3200 -97.3300 251.000 122.0 131.811 4.420 -999.990 -999.990 1.318 ..P WKT 2010 09 28 01 19 55 31.3200 -97.3300 251.000 457.0 127.969 3.760 -999.990 -999.990 1.280 ..P WKT 2010 09 28 01 29 55 31.3200 -97.3300 251.000 30.0 126.177 4.910 -999.990 -999.990 1.262 ..P WKT 2010 09 28 01 34 55 31.3200 -97.3300 251.000 122.0 129.200 3.860 -999.990 -999.990 1.292 ..P WKT 2010 09 28 01 39 55 31.3200 -97.3300 251.000 457.0 134.451 3.700 -999.990 -999.990 1.345 ..P WKT 2010 09 28 01 44 55 31.3200 -97.3300 251.000 30.0 127.865 4.870 -999.990 -999.990 1.279 ..P WKT 2010 09 28 01 49 55 31.3200 -97.3300 251.000 122.0 128.242 5.020 -999.990 -999.990 1.282 ..P WKT 2010 09 28 01 54 55 31.3200 -97.3300 251.000 457.0 128.898 3.930 -999.990 -999.990 1.289 ..P WKT 2010 09 28 02 04 55 31.3200 -97.3300 251.000 30.0 137.626 3.990 -999.990 -999.990 1.376 ..P WKT 2010 09 28 02 09 55 31.3200 -97.3300 251.000 122.0 117.023 4.320 -999.990 -999.990 1.170 ..P WKT 2010 09 28 02 14 55 31.3200 -97.3300 251.000 457.0 131.498 4.260 -999.990 -999.990 1.315 ..P WKT 2010 09 28 02 19 55 31.3200 -97.3300 251.000 30.0 122.172 4.220 -999.990 -999.990 1.222 ..P WKT 2010 09 28 02 24 55 31.3200 -97.3300 251.000 122.0 123.703 4.150 -999.990 -999.990 1.237 ..P WKT 2010 09 28 02 29 55 31.3200 -97.3300 251.000 457.0 130.104 5.210 -999.990 -999.990 1.301 ..P WKT 2010 09 28 02 39 55 31.3200 -97.3300 251.000 30.0 120.739 4.920 -999.990 -999.990 1.207 ..P WKT 2010 09 28 02 44 55 31.3200 -97.3300 251.000 122.0 123.899 4.750 -999.990 -999.990 1.239 ..P WKT 2010 09 28 02 49 55 31.3200 -97.3300 251.000 457.0 127.058 4.300 -999.990 -999.990 1.271 ..P WKT 2010 09 28 02 54 55 31.3200 -97.3300 251.000 30.0 123.402 3.950 -999.990 -999.990 1.234 ..P WKT 2010 09 28 02 59 55 31.3200 -97.3300 251.000 122.0 128.368 4.380 -999.990 -999.990 1.284 ..P WKT 2010 09 28 03 04 55 31.3200 -97.3300 251.000 457.0 127.354 4.270 -999.990 -999.990 1.274 ..P WKT 2010 09 28 03 14 55 31.3200 -97.3300 251.000 30.0 125.902 4.080 -999.990 -999.990 1.259 ..P WKT 2010 09 28 03 19 55 31.3200 -97.3300 251.000 122.0 124.909 4.000 -999.990 -999.990 1.249 ..P WKT 2010 09 28 03 24 55 31.3200 -97.3300 251.000 457.0 135.456 4.560 -999.990 -999.990 1.355 ..P WKT 2010 09 28 03 29 55 31.3200 -97.3300 251.000 30.0 125.702 3.760 -999.990 -999.990 1.257 ..P WKT 2010 09 28 03 34 55 31.3200 -97.3300 251.000 122.0 129.296 4.550 -999.990 -999.990 1.293 ..P WKT 2010 09 28 03 39 55 31.3200 -97.3300 251.000 457.0 132.890 4.480 -999.990 -999.990 1.329 ..P WKT 2010 09 28 03 49 55 31.3200 -97.3300 251.000 30.0 129.453 3.910 -999.990 -999.990 1.295 ..P WKT 2010 09 28 03 54 55 31.3200 -97.3300 251.000 122.0 135.766 3.790 -999.990 -999.990 1.358 ..P WKT 2010 09 28 03 59 55 31.3200 -97.3300 251.000 457.0 128.736 3.740 -999.990 -999.990 1.287 ..P WKT 2010 09 28 04 04 55 31.3200 -97.3300 251.000 30.0 133.659 4.150 -999.990 -999.990 1.337 ..P WKT 2010 09 28 04 09 55 31.3200 -97.3300 251.000 122.0 134.968 5.210 -999.990 -999.990 1.350 ..P WKT 2010 09 28 04 14 55 31.3200 -97.3300 251.000 457.0 128.217 4.660 -999.990 -999.990 1.282 ..P WKT 2010 09 28 04 24 55 31.3200 -97.3300 251.000 30.0 133.376 4.470 -999.990 -999.990 1.334 ..P WKT 2010 09 28 04 29 55 31.3200 -97.3300 251.000 122.0 133.057 3.750 -999.990 -999.990 1.331 ..P WKT 2010 09 28 04 34 55 31.3200 -97.3300 251.000 457.0 126.626 3.980 -999.990 -999.990 1.266 ..P WKT 2010 09 28 04 39 55 31.3200 -97.3300 251.000 30.0 126.308 4.410 -999.990 -999.990 1.263 ..P WKT 2010 09 28 04 44 55 31.3200 -97.3300 251.000 122.0 138.490 5.050 -999.990 -999.990 1.385 ..P WKT 2010 09 28 04 49 55 31.3200 -97.3300 251.000 457.0 126.504 4.240 -999.990 -999.990 1.265 ..P WKT 2010 09 28 05 04 55 31.3200 -97.3300 251.000 30.0 131.287 5.640 -999.990 -999.990 1.313 ..P WKT 2010 09 28 05 09 55 31.3200 -97.3300 251.000 122.0 133.977 3.740 -999.990 -999.990 1.340 ..P WKT 2010 09 28 05 14 55 31.3200 -97.3300 251.000 457.0 120.004 4.480 -999.990 -999.990 1.200 ..P WKT 2010 09 28 05 19 55 31.3200 -97.3300 251.000 30.0 127.554 3.800 -999.990 -999.990 1.276 ..P WKT 2010 09 28 05 24 55 31.3200 -97.3300 251.000 122.0 135.795 3.700 -999.990 -999.990 1.358 ..P WKT 2010 09 28 05 29 55 31.3200 -97.3300 251.000 457.0 126.685 3.750 -999.990 -999.990 1.267 ..P WKT 2010 09 28 05 39 55 31.3200 -97.3300 251.000 30.0 136.569 3.520 -999.990 -999.990 1.366 ..P WKT 2010 09 28 05 44 55 31.3200 -97.3300 251.000 122.0 138.352 4.200 -999.990 -999.990 1.384 ..P WKT 2010 09 28 05 49 55 31.3200 -97.3300 251.000 457.0 123.066 3.760 -999.990 -999.990 1.231 ..P WKT 2010 09 28 05 54 55 31.3200 -97.3300 251.000 30.0 141.363 4.340 -999.990 -999.990 1.414 ..P WKT 2010 09 28 05 59 55 31.3200 -97.3300 251.000 122.0 136.484 3.890 -999.990 -999.990 1.365 ..P WKT 2010 09 28 06 04 55 31.3200 -97.3300 251.000 457.0 129.803 3.840 -999.990 -999.990 1.298 ..P WKT 2010 09 28 06 14 55 31.3200 -97.3300 251.000 30.0 132.080 3.950 -999.990 -999.990 1.321 ..P WKT 2010 09 28 06 19 55 31.3200 -97.3300 251.000 122.0 139.094 4.830 -999.990 -999.990 1.391 ..P WKT 2010 09 28 06 24 55 31.3200 -97.3300 251.000 457.0 126.411 5.590 -999.990 -999.990 1.264 ..P WKT 2010 09 28 06 29 55 31.3200 -97.3300 251.000 30.0 136.060 4.860 -999.990 -999.990 1.361 ..P WKT 2010 09 28 06 34 55 31.3200 -97.3300 251.000 122.0 136.969 3.420 -999.990 -999.990 1.370 ..P WKT 2010 09 28 06 39 55 31.3200 -97.3300 251.000 457.0 128.865 4.190 -999.990 -999.990 1.289 ..P WKT 2010 09 28 06 49 55 31.3200 -97.3300 251.000 30.0 146.750 3.560 -999.990 -999.990 1.468 ..P WKT 2010 09 28 06 54 55 31.3200 -97.3300 251.000 122.0 137.380 4.220 -999.990 -999.990 1.374 ..P WKT 2010 09 28 06 59 55 31.3200 -97.3300 251.000 457.0 122.603 4.500 -999.990 -999.990 1.226 ..P WKT 2010 09 28 07 04 55 31.3200 -97.3300 251.000 30.0 116.978 3.330 -999.990 -999.990 1.170 ..P WKT 2010 09 28 07 09 55 31.3200 -97.3300 251.000 122.0 141.712 4.670 -999.990 -999.990 1.417 ..P WKT 2010 09 28 07 14 55 31.3200 -97.3300 251.000 457.0 119.314 5.460 -999.990 -999.990 1.193 ..P WKT 2010 09 28 07 24 55 31.3200 -97.3300 251.000 30.0 122.086 3.680 -999.990 -999.990 1.221 ..P WKT 2010 09 28 07 29 55 31.3200 -97.3300 251.000 122.0 139.348 5.450 -999.990 -999.990 1.393 ..P WKT 2010 09 28 07 34 55 31.3200 -97.3300 251.000 457.0 130.003 4.150 -999.990 -999.990 1.300 ..P WKT 2010 09 28 07 39 55 31.3200 -97.3300 251.000 30.0 111.238 4.310 -999.990 -999.990 1.112 ..P WKT 2010 09 28 07 44 55 31.3200 -97.3300 251.000 122.0 136.810 4.330 -999.990 -999.990 1.368 ..P WKT 2010 09 28 07 49 55 31.3200 -97.3300 251.000 457.0 128.576 4.910 -999.990 -999.990 1.286 ..P WKT 2010 09 28 07 59 55 31.3200 -97.3300 251.000 30.0 113.297 5.790 -999.990 -999.990 1.133 ..P WKT 2010 09 28 08 04 55 31.3200 -97.3300 251.000 122.0 136.726 4.790 -999.990 -999.990 1.367 ..P WKT 2010 09 28 08 09 55 31.3200 -97.3300 251.000 457.0 113.336 4.510 -999.990 -999.990 1.133 ..P WKT 2010 09 28 08 14 55 31.3200 -97.3300 251.000 30.0 123.466 4.670 -999.990 -999.990 1.235 ..P WKT 2010 09 28 08 19 55 31.3200 -97.3300 251.000 122.0 128.056 4.150 -999.990 -999.990 1.281 ..P WKT 2010 09 28 08 24 55 31.3200 -97.3300 251.000 457.0 116.582 3.990 -999.990 -999.990 1.166 ..P WKT 2010 09 28 08 34 55 31.3200 -97.3300 251.000 30.0 123.781 3.710 -999.990 -999.990 1.238 ..P WKT 2010 09 28 08 39 55 31.3200 -97.3300 251.000 122.0 132.206 4.160 -999.990 -999.990 1.322 ..P WKT 2010 09 28 08 44 55 31.3200 -97.3300 251.000 457.0 111.835 3.310 -999.990 -999.990 1.118 ..P WKT 2010 09 28 08 49 55 31.3200 -97.3300 251.000 30.0 128.011 3.430 -999.990 -999.990 1.280 ..P WKT 2010 09 28 08 54 55 31.3200 -97.3300 251.000 122.0 144.185 3.260 -999.990 -999.990 1.442 ..P WKT 2010 09 28 08 59 55 31.3200 -97.3300 251.000 457.0 122.710 3.710 -999.990 -999.990 1.227 ..P WKT 2010 09 28 09 09 55 31.3200 -97.3300 251.000 30.0 126.664 2.900 -999.990 -999.990 1.267 ..P WKT 2010 09 28 09 14 55 31.3200 -97.3300 251.000 122.0 144.335 3.240 -999.990 -999.990 1.443 ..P WKT 2010 09 28 09 19 55 31.3200 -97.3300 251.000 457.0 129.765 4.510 -999.990 -999.990 1.298 ..P WKT 2010 09 28 09 24 55 31.3200 -97.3300 251.000 30.0 123.084 3.300 -999.990 -999.990 1.231 ..P WKT 2010 09 28 09 29 55 31.3200 -97.3300 251.000 122.0 145.179 3.720 -999.990 -999.990 1.452 ..P WKT 2010 09 28 09 34 55 31.3200 -97.3300 251.000 457.0 131.719 3.650 -999.990 -999.990 1.317 ..P WKT 2010 09 28 09 44 55 31.3200 -97.3300 251.000 30.0 130.927 4.080 -999.990 -999.990 1.309 ..P WKT 2010 09 28 09 49 55 31.3200 -97.3300 251.000 122.0 150.091 3.910 -999.990 -999.990 1.501 ..P WKT 2010 09 28 09 54 55 31.3200 -97.3300 251.000 457.0 126.795 4.070 -999.990 -999.990 1.268 ..P WKT 2010 09 28 09 59 55 31.3200 -97.3300 251.000 30.0 131.437 5.340 -999.990 -999.990 1.314 ..P WKT 2010 09 28 10 04 55 31.3200 -97.3300 251.000 122.0 150.735 3.790 -999.990 -999.990 1.507 ..P WKT 2010 09 28 10 09 55 31.3200 -97.3300 251.000 457.0 127.722 4.240 -999.990 -999.990 1.277 ..P WKT 2010 09 28 10 19 55 31.3200 -97.3300 251.000 30.0 130.979 3.670 -999.990 -999.990 1.310 ..P WKT 2010 09 28 10 24 55 31.3200 -97.3300 251.000 122.0 143.834 3.370 -999.990 -999.990 1.438 ..P WKT 2010 09 28 10 29 55 31.3200 -97.3300 251.000 457.0 134.156 4.120 -999.990 -999.990 1.342 ..P WKT 2010 09 28 10 34 55 31.3200 -97.3300 251.000 30.0 131.252 2.970 -999.990 -999.990 1.313 ..P WKT 2010 09 28 10 39 55 31.3200 -97.3300 251.000 122.0 139.682 3.580 -999.990 -999.990 1.397 ..P WKT 2010 09 28 10 44 55 31.3200 -97.3300 251.000 457.0 121.852 3.730 -999.990 -999.990 1.219 ..P WKT 2010 09 28 10 54 55 31.3200 -97.3300 251.000 30.0 135.630 3.620 -999.990 -999.990 1.356 ..P WKT 2010 09 28 10 59 55 31.3200 -97.3300 251.000 122.0 140.287 4.240 -999.990 -999.990 1.403 ..P WKT 2010 09 28 11 04 55 31.3200 -97.3300 251.000 457.0 127.258 3.510 -999.990 -999.990 1.273 ..P WKT 2010 09 28 11 09 55 31.3200 -97.3300 251.000 30.0 138.409 4.190 -999.990 -999.990 1.384 ..P WKT 2010 09 28 11 14 55 31.3200 -97.3300 251.000 122.0 138.643 3.740 -999.990 -999.990 1.386 ..P WKT 2010 09 28 11 19 55 31.3200 -97.3300 251.000 457.0 128.380 3.610 -999.990 -999.990 1.284 ..P WKT 2010 09 28 11 29 55 31.3200 -97.3300 251.000 30.0 137.213 3.240 -999.990 -999.990 1.372 ..P WKT 2010 09 28 11 34 55 31.3200 -97.3300 251.000 122.0 150.228 4.000 -999.990 -999.990 1.502 ..P WKT 2010 09 28 11 39 55 31.3200 -97.3300 251.000 457.0 123.470 5.560 -999.990 -999.990 1.235 ..P WKT 2010 09 28 11 44 55 31.3200 -97.3300 251.000 30.0 136.207 3.980 -999.990 -999.990 1.362 ..P WKT 2010 09 28 11 49 55 31.3200 -97.3300 251.000 122.0 137.345 3.290 -999.990 -999.990 1.373 ..P WKT 2010 09 28 12 09 55 31.3200 -97.3300 251.000 457.0 111.389 2.870 -999.990 -999.990 1.114 ..P WKT 2010 09 28 12 10 25 31.3200 -97.3300 251.000 457.0 115.219 2.920 -999.990 -999.990 1.152 ..P WKT 2010 09 28 12 10 55 31.3200 -97.3300 251.000 457.0 114.631 3.130 -999.990 -999.990 1.146 ..P WKT 2010 09 28 12 11 25 31.3200 -97.3300 251.000 457.0 111.007 2.770 -999.990 -999.990 1.110 ..P WKT 2010 09 28 12 11 55 31.3200 -97.3300 251.000 457.0 111.524 2.620 -999.990 -999.990 1.115 ..P WKT 2010 09 28 12 12 25 31.3200 -97.3300 251.000 457.0 113.973 2.810 -999.990 -999.990 1.140 ..P WKT 2010 09 28 12 12 55 31.3200 -97.3300 251.000 457.0 115.319 2.720 -999.990 -999.990 1.153 ..P WKT 2010 09 28 12 13 25 31.3200 -97.3300 251.000 457.0 112.799 2.730 -999.990 -999.990 1.128 ..P WKT 2010 09 28 12 13 55 31.3200 -97.3300 251.000 457.0 116.904 3.620 -999.990 -999.990 1.169 ..P WKT 2010 09 28 12 14 25 31.3200 -97.3300 251.000 457.0 115.765 3.040 -999.990 -999.990 1.158 ..P WKT 2010 09 28 12 14 55 31.3200 -97.3300 251.000 457.0 117.386 3.480 -999.990 -999.990 1.174 ..P WKT 2010 09 28 12 19 55 31.3200 -97.3300 251.000 30.0 117.585 3.840 -999.990 -999.990 1.176 ..P WKT 2010 09 28 12 24 55 31.3200 -97.3300 251.000 122.0 123.581 3.040 -999.990 -999.990 1.236 ..P WKT 2010 09 28 12 29 55 31.3200 -97.3300 251.000 457.0 114.673 2.810 -999.990 -999.990 1.147 ..P WKT 2010 09 28 12 34 55 31.3200 -97.3300 251.000 30.0 117.356 3.370 -999.990 -999.990 1.174 ..P WKT 2010 09 28 12 39 55 31.3200 -97.3300 251.000 122.0 128.042 3.090 -999.990 -999.990 1.280 ..P WKT 2010 09 28 12 44 55 31.3200 -97.3300 251.000 457.0 110.582 3.390 -999.990 -999.990 1.106 ..P WKT 2010 09 28 12 54 55 31.3200 -97.3300 251.000 30.0 121.250 3.480 -999.990 -999.990 1.213 ..P WKT 2010 09 28 12 59 55 31.3200 -97.3300 251.000 122.0 140.268 3.070 -999.990 -999.990 1.403 ..P WKT 2010 09 28 13 04 55 31.3200 -97.3300 251.000 457.0 114.876 3.030 -999.990 -999.990 1.149 ..P WKT 2010 09 28 13 09 55 31.3200 -97.3300 251.000 30.0 118.722 3.450 -999.990 -999.990 1.187 ..P WKT 2010 09 28 13 14 55 31.3200 -97.3300 251.000 122.0 129.186 3.420 -999.990 -999.990 1.292 ..P WKT 2010 09 28 13 19 55 31.3200 -97.3300 251.000 457.0 113.315 3.040 -999.990 -999.990 1.133 ..P WKT 2010 09 28 13 29 55 31.3200 -97.3300 251.000 30.0 120.335 2.830 -999.990 -999.990 1.203 ..P WKT 2010 09 28 13 34 55 31.3200 -97.3300 251.000 122.0 137.570 3.850 -999.990 -999.990 1.376 ..P WKT 2010 09 28 13 39 55 31.3200 -97.3300 251.000 457.0 123.239 3.640 -999.990 -999.990 1.232 ..P WKT 2010 09 28 13 44 55 31.3200 -97.3300 251.000 30.0 129.307 4.460 -999.990 -999.990 1.293 ..P WKT 2010 09 28 13 49 55 31.3200 -97.3300 251.000 122.0 139.784 4.630 -999.990 -999.990 1.398 ..P WKT 2010 09 28 13 54 55 31.3200 -97.3300 251.000 457.0 127.110 3.150 -999.990 -999.990 1.271 ..P WKT 2010 09 28 14 04 55 31.3200 -97.3300 251.000 30.0 129.735 3.750 -999.990 -999.990 1.297 ..P WKT 2010 09 28 14 09 55 31.3200 -97.3300 251.000 122.0 142.412 5.130 -999.990 -999.990 1.424 ..P WKT 2010 09 28 14 14 55 31.3200 -97.3300 251.000 457.0 124.921 4.240 -999.990 -999.990 1.249 ..P WKT 2010 09 28 14 19 55 31.3200 -97.3300 251.000 30.0 132.363 5.690 -999.990 -999.990 1.324 ..P WKT 2010 09 28 14 24 55 31.3200 -97.3300 251.000 122.0 150.133 4.730 -999.990 -999.990 1.501 ..P WKT 2010 09 28 14 29 55 31.3200 -97.3300 251.000 457.0 116.396 4.700 -999.990 -999.990 1.164 ..P WKT 2010 09 28 14 39 55 31.3200 -97.3300 251.000 30.0 140.205 4.410 -999.990 -999.990 1.402 ..P WKT 2010 09 28 14 44 55 31.3200 -97.3300 251.000 122.0 144.456 4.080 -999.990 -999.990 1.445 ..P WKT 2010 09 28 14 49 55 31.3200 -97.3300 251.000 457.0 123.514 4.370 -999.990 -999.990 1.235 ..P WKT 2010 09 28 14 54 55 31.3200 -97.3300 251.000 30.0 138.502 5.160 -999.990 -999.990 1.385 ..P WKT 2010 09 28 14 59 55 31.3200 -97.3300 251.000 122.0 137.935 4.650 -999.990 -999.990 1.379 ..P WKT 2010 09 28 15 04 55 31.3200 -97.3300 251.000 457.0 120.715 4.520 -999.990 -999.990 1.207 ..P WKT 2010 09 28 15 14 55 31.3200 -97.3300 251.000 30.0 141.895 4.060 -999.990 -999.990 1.419 ..P WKT 2010 09 28 15 19 55 31.3200 -97.3300 251.000 122.0 144.512 4.790 -999.990 -999.990 1.445 ..P WKT 2010 09 28 15 24 55 31.3200 -97.3300 251.000 457.0 117.136 5.220 -999.990 -999.990 1.171 ..P WKT 2010 09 28 15 29 55 31.3200 -97.3300 251.000 30.0 145.893 4.650 -999.990 -999.990 1.459 ..P WKT 2010 09 28 15 34 55 31.3200 -97.3300 251.000 122.0 146.858 4.370 -999.990 -999.990 1.469 ..P WKT 2010 09 28 15 39 55 31.3200 -97.3300 251.000 457.0 117.288 3.700 -999.990 -999.990 1.173 ..P WKT 2010 09 28 15 49 55 31.3200 -97.3300 251.000 30.0 199.379 3.950 -999.990 -999.990 1.994 ..P WKT 2010 09 28 15 54 55 31.3200 -97.3300 251.000 122.0 208.434 5.960 -999.990 -999.990 2.084 ..P WKT 2010 09 28 15 59 55 31.3200 -97.3300 251.000 457.0 123.435 4.680 -999.990 -999.990 1.234 ..P WKT 2010 09 28 16 04 55 31.3200 -97.3300 251.000 30.0 176.491 5.750 -999.990 -999.990 1.765 ..P WKT 2010 09 28 16 09 55 31.3200 -97.3300 251.000 122.0 185.544 5.110 -999.990 -999.990 1.855 ..P WKT 2010 09 28 16 14 55 31.3200 -97.3300 251.000 457.0 113.765 3.690 -999.990 -999.990 1.138 ..P WKT 2010 09 28 16 24 55 31.3200 -97.3300 251.000 30.0 152.024 3.490 -999.990 -999.990 1.520 ..P WKT 2010 09 28 16 29 55 31.3200 -97.3300 251.000 122.0 152.085 4.400 -999.990 -999.990 1.521 ..P WKT 2010 09 28 16 34 55 31.3200 -97.3300 251.000 457.0 116.417 3.530 -999.990 -999.990 1.164 ..P WKT 2010 09 28 16 39 55 31.3200 -97.3300 251.000 30.0 167.046 4.290 -999.990 -999.990 1.670 ..P WKT 2010 09 28 16 44 55 31.3200 -97.3300 251.000 122.0 166.006 3.850 -999.990 -999.990 1.660 ..P WKT 2010 09 28 16 49 55 31.3200 -97.3300 251.000 457.0 149.305 3.410 -999.990 -999.990 1.493 ..P WKT 2010 09 28 17 04 55 31.3200 -97.3300 251.000 30.0 152.353 3.520 -999.990 -999.990 1.524 ..P WKT 2010 09 28 17 09 55 31.3200 -97.3300 251.000 122.0 171.356 4.230 -999.990 -999.990 1.714 ..P WKT 2010 09 28 17 14 55 31.3200 -97.3300 251.000 457.0 137.485 4.080 -999.990 -999.990 1.375 ..P WKT 2010 09 28 17 19 55 31.3200 -97.3300 251.000 30.0 136.576 4.390 -999.990 -999.990 1.366 ..P WKT 2010 09 28 17 24 55 31.3200 -97.3300 251.000 122.0 142.258 4.870 -999.990 -999.990 1.423 ..P WKT 2010 09 28 17 29 55 31.3200 -97.3300 251.000 457.0 132.561 4.800 -999.990 -999.990 1.326 ..P WKT 2010 09 28 17 39 55 31.3200 -97.3300 251.000 30.0 124.146 5.100 -999.990 -999.990 1.241 ..P WKT 2010 09 28 17 44 55 31.3200 -97.3300 251.000 122.0 133.797 5.450 -999.990 -999.990 1.338 ..P WKT 2010 09 28 17 49 55 31.3200 -97.3300 251.000 457.0 129.722 5.830 -999.990 -999.990 1.297 ..P WKT 2010 09 28 17 54 55 31.3200 -97.3300 251.000 30.0 132.098 5.880 -999.990 -999.990 1.321 ..P WKT 2010 09 28 17 59 55 31.3200 -97.3300 251.000 122.0 133.925 5.810 -999.990 -999.990 1.339 ..P WKT 2010 09 28 18 04 55 31.3200 -97.3300 251.000 457.0 126.146 5.770 -999.990 -999.990 1.261 ..P WKT 2010 09 28 18 14 55 31.3200 -97.3300 251.000 30.0 127.173 5.710 -999.990 -999.990 1.272 ..P WKT 2010 09 28 18 19 55 31.3200 -97.3300 251.000 122.0 124.728 5.540 -999.990 -999.990 1.247 ..P WKT 2010 09 28 18 24 55 31.3200 -97.3300 251.000 457.0 129.278 5.380 -999.990 -999.990 1.293 ..P WKT 2010 09 28 18 29 55 31.3200 -97.3300 251.000 30.0 124.089 4.630 -999.990 -999.990 1.241 ..P WKT 2010 09 28 18 34 55 31.3200 -97.3300 251.000 122.0 132.478 4.770 -999.990 -999.990 1.325 ..P WKT 2010 09 28 18 39 55 31.3200 -97.3300 251.000 457.0 123.176 4.070 -999.990 -999.990 1.232 ..P WKT 2010 09 28 18 49 55 31.3200 -97.3300 251.000 30.0 127.475 3.970 -999.990 -999.990 1.275 ..P WKT 2010 09 28 18 54 55 31.3200 -97.3300 251.000 122.0 130.514 4.350 -999.990 -999.990 1.305 ..P WKT 2010 09 28 18 59 55 31.3200 -97.3300 251.000 457.0 118.885 4.230 -999.990 -999.990 1.189 ..P WKT 2010 09 28 19 04 55 31.3200 -97.3300 251.000 30.0 132.205 4.540 -999.990 -999.990 1.322 ..P WKT 2010 09 28 19 09 55 31.3200 -97.3300 251.000 122.0 126.334 4.630 -999.990 -999.990 1.263 ..P WKT 2010 09 28 19 14 55 31.3200 -97.3300 251.000 457.0 124.850 4.790 -999.990 -999.990 1.248 ..P WKT 2010 09 28 19 24 55 31.3200 -97.3300 251.000 30.0 127.227 4.580 -999.990 -999.990 1.272 ..P WKT 2010 09 28 19 29 55 31.3200 -97.3300 251.000 122.0 134.101 4.620 -999.990 -999.990 1.341 ..P WKT 2010 09 28 19 34 55 31.3200 -97.3300 251.000 457.0 127.821 5.330 -999.990 -999.990 1.278 ..P WKT 2010 09 28 19 39 55 31.3200 -97.3300 251.000 30.0 129.489 3.960 -999.990 -999.990 1.295 ..P WKT 2010 09 28 19 44 55 31.3200 -97.3300 251.000 122.0 129.238 3.510 -999.990 -999.990 1.292 ..P WKT 2010 09 28 19 49 55 31.3200 -97.3300 251.000 457.0 129.535 3.950 -999.990 -999.990 1.295 ..P WKT 2010 09 28 19 59 55 31.3200 -97.3300 251.000 30.0 122.852 3.870 -999.990 -999.990 1.229 ..P WKT 2010 09 28 20 04 55 31.3200 -97.3300 251.000 122.0 129.840 4.080 -999.990 -999.990 1.298 ..P WKT 2010 09 28 20 09 55 31.3200 -97.3300 251.000 457.0 131.623 3.200 -999.990 -999.990 1.316 ..P WKT 2010 09 28 20 14 55 31.3200 -97.3300 251.000 30.0 127.382 5.390 -999.990 -999.990 1.274 ..P WKT 2010 09 28 20 19 55 31.3200 -97.3300 251.000 122.0 130.261 3.610 -999.990 -999.990 1.303 ..P WKT 2010 09 28 20 24 55 31.3200 -97.3300 251.000 457.0 117.261 3.280 -999.990 -999.990 1.173 ..P WKT 2010 09 28 20 34 55 31.3200 -97.3300 251.000 30.0 122.236 3.300 -999.990 -999.990 1.222 ..P WKT 2010 09 28 20 39 55 31.3200 -97.3300 251.000 122.0 128.985 3.560 -999.990 -999.990 1.290 ..P WKT 2010 09 28 20 44 55 31.3200 -97.3300 251.000 457.0 118.491 3.350 -999.990 -999.990 1.185 ..P WKT 2010 09 28 20 49 55 31.3200 -97.3300 251.000 30.0 124.692 4.360 -999.990 -999.990 1.247 ..P WKT 2010 09 28 20 54 55 31.3200 -97.3300 251.000 122.0 125.419 3.490 -999.990 -999.990 1.254 ..P WKT 2010 09 28 20 59 55 31.3200 -97.3300 251.000 457.0 121.632 4.680 -999.990 -999.990 1.216 ..P WKT 2010 09 28 21 09 55 31.3200 -97.3300 251.000 30.0 122.852 3.930 -999.990 -999.990 1.229 ..P WKT 2010 09 28 21 14 55 31.3200 -97.3300 251.000 122.0 118.421 4.060 -999.990 -999.990 1.184 ..P WKT 2010 09 28 21 19 55 31.3200 -97.3300 251.000 457.0 126.846 5.670 -999.990 -999.990 1.268 ..P WKT 2010 09 28 21 24 55 31.3200 -97.3300 251.000 30.0 121.732 4.280 -999.990 -999.990 1.217 ..P WKT 2010 09 28 21 29 55 31.3200 -97.3300 251.000 122.0 128.241 4.230 -999.990 -999.990 1.282 ..P WKT 2010 09 28 21 34 55 31.3200 -97.3300 251.000 457.0 121.623 4.860 -999.990 -999.990 1.216 ..P WKT 2010 09 28 21 44 55 31.3200 -97.3300 251.000 30.0 120.069 3.980 -999.990 -999.990 1.201 ..P WKT 2010 09 28 21 49 55 31.3200 -97.3300 251.000 122.0 128.138 4.250 -999.990 -999.990 1.281 ..P WKT 2010 09 28 21 54 55 31.3200 -97.3300 251.000 457.0 118.574 4.580 -999.990 -999.990 1.186 ..P WKT 2010 09 28 21 59 55 31.3200 -97.3300 251.000 30.0 120.356 3.900 -999.990 -999.990 1.204 ..P WKT 2010 09 28 22 04 55 31.3200 -97.3300 251.000 122.0 116.397 4.370 -999.990 -999.990 1.164 ..P WKT 2010 09 28 22 09 55 31.3200 -97.3300 251.000 457.0 126.514 3.660 -999.990 -999.990 1.265 ..P WKT 2010 09 28 22 19 55 31.3200 -97.3300 251.000 30.0 118.265 3.860 -999.990 -999.990 1.183 ..P WKT 2010 09 28 22 24 55 31.3200 -97.3300 251.000 122.0 121.490 4.930 -999.990 -999.990 1.215 ..P WKT 2010 09 28 22 29 55 31.3200 -97.3300 251.000 457.0 120.343 3.790 -999.990 -999.990 1.203 ..P WKT 2010 09 28 22 34 55 31.3200 -97.3300 251.000 30.0 119.743 3.610 -999.990 -999.990 1.197 ..P WKT 2010 09 28 22 39 55 31.3200 -97.3300 251.000 122.0 125.972 4.180 -999.990 -999.990 1.260 ..P WKT 2010 09 28 22 44 55 31.3200 -97.3300 251.000 457.0 127.829 3.910 -999.990 -999.990 1.278 ..P WKT 2010 09 28 22 54 55 31.3200 -97.3300 251.000 30.0 121.652 3.290 -999.990 -999.990 1.217 ..P WKT 2010 09 28 22 59 55 31.3200 -97.3300 251.000 122.0 128.776 3.580 -999.990 -999.990 1.288 ..P WKT 2010 09 28 23 04 55 31.3200 -97.3300 251.000 457.0 130.164 3.830 -999.990 -999.990 1.302 ..P WKT 2010 09 28 23 09 55 31.3200 -97.3300 251.000 30.0 127.457 4.820 -999.990 -999.990 1.275 ..P WKT 2010 09 28 23 14 55 31.3200 -97.3300 251.000 122.0 133.760 3.770 -999.990 -999.990 1.338 ..P WKT 2010 09 28 23 19 55 31.3200 -97.3300 251.000 457.0 128.050 3.480 -999.990 -999.990 1.281 ..P WKT 2010 09 28 23 29 55 31.3200 -97.3300 251.000 30.0 129.184 3.640 -999.990 -999.990 1.292 ..P WKT 2010 09 28 23 34 55 31.3200 -97.3300 251.000 122.0 135.752 4.130 -999.990 -999.990 1.358 ..P WKT 2010 09 28 23 39 55 31.3200 -97.3300 251.000 457.0 131.131 3.850 -999.990 -999.990 1.311 ..P WKT 2010 09 28 23 44 55 31.3200 -97.3300 251.000 30.0 131.695 4.100 -999.990 -999.990 1.317 ..P WKT 2010 09 28 23 49 55 31.3200 -97.3300 251.000 122.0 139.625 3.960 -999.990 -999.990 1.396 ..P WKT 2010 09 29 00 09 55 31.3200 -97.3300 251.000 457.0 125.152 3.910 -999.990 -999.990 1.252 ..P WKT 2010 09 29 00 10 25 31.3200 -97.3300 251.000 457.0 122.222 4.040 -999.990 -999.990 1.222 ..P WKT 2010 09 29 00 10 55 31.3200 -97.3300 251.000 457.0 126.386 4.060 -999.990 -999.990 1.264 ..P WKT 2010 09 29 00 11 25 31.3200 -97.3300 251.000 457.0 121.819 3.820 -999.990 -999.990 1.218 ..P WKT 2010 09 29 00 11 55 31.3200 -97.3300 251.000 457.0 122.709 4.050 -999.990 -999.990 1.227 ..P WKT 2010 09 29 00 12 25 31.3200 -97.3300 251.000 457.0 123.325 4.630 -999.990 -999.990 1.233 ..P WKT 2010 09 29 00 12 55 31.3200 -97.3300 251.000 457.0 129.673 3.960 -999.990 -999.990 1.297 ..P WKT 2010 09 29 00 13 25 31.3200 -97.3300 251.000 457.0 131.109 3.930 -999.990 -999.990 1.311 ..P WKT 2010 09 29 00 13 55 31.3200 -97.3300 251.000 457.0 130.089 4.710 -999.990 -999.990 1.301 ..P WKT 2010 09 29 00 14 25 31.3200 -97.3300 251.000 457.0 126.340 3.920 -999.990 -999.990 1.263 ..P WKT 2010 09 29 00 14 55 31.3200 -97.3300 251.000 457.0 129.140 4.030 -999.990 -999.990 1.291 ..P WKT 2010 09 29 00 19 55 31.3200 -97.3300 251.000 30.0 133.675 4.010 -999.990 -999.990 1.337 ..P WKT 2010 09 29 00 24 55 31.3200 -97.3300 251.000 122.0 139.303 4.360 -999.990 -999.990 1.393 ..P WKT 2010 09 29 00 29 55 31.3200 -97.3300 251.000 457.0 131.552 4.760 -999.990 -999.990 1.316 ..P WKT 2010 09 29 00 34 55 31.3200 -97.3300 251.000 30.0 132.812 4.680 -999.990 -999.990 1.328 ..P WKT 2010 09 29 00 39 55 31.3200 -97.3300 251.000 122.0 125.605 4.220 -999.990 -999.990 1.256 ..P WKT 2010 09 29 00 44 55 31.3200 -97.3300 251.000 457.0 126.318 7.360 -999.990 -999.990 1.263 ..P WKT 2010 09 29 00 54 55 31.3200 -97.3300 251.000 30.0 133.059 5.390 -999.990 -999.990 1.331 ..P WKT 2010 09 29 00 59 55 31.3200 -97.3300 251.000 122.0 129.932 4.400 -999.990 -999.990 1.299 ..P WKT 2010 09 29 01 04 55 31.3200 -97.3300 251.000 457.0 126.257 4.720 -999.990 -999.990 1.263 ..P WKT 2010 09 29 01 09 55 31.3200 -97.3300 251.000 30.0 125.042 5.750 -999.990 -999.990 1.250 ..P WKT 2010 09 29 01 14 55 31.3200 -97.3300 251.000 122.0 121.366 5.560 -999.990 -999.990 1.214 ..P WKT 2010 09 29 01 19 55 31.3200 -97.3300 251.000 457.0 116.457 4.610 -999.990 -999.990 1.165 ..P WKT 2010 09 29 01 29 55 31.3200 -97.3300 251.000 30.0 120.197 4.870 -999.990 -999.990 1.202 ..P WKT 2010 09 29 01 34 55 31.3200 -97.3300 251.000 122.0 123.377 4.410 -999.990 -999.990 1.234 ..P WKT 2010 09 29 01 39 55 31.3200 -97.3300 251.000 457.0 116.159 4.530 -999.990 -999.990 1.162 ..P WKT 2010 09 29 01 44 55 31.3200 -97.3300 251.000 30.0 122.077 3.920 -999.990 -999.990 1.221 ..P WKT 2010 09 29 01 49 55 31.3200 -97.3300 251.000 122.0 127.586 3.860 -999.990 -999.990 1.276 ..P WKT 2010 09 29 01 54 55 31.3200 -97.3300 251.000 457.0 125.841 4.760 -999.990 -999.990 1.258 ..P WKT 2010 09 29 02 04 55 31.3200 -97.3300 251.000 30.0 124.873 4.430 -999.990 -999.990 1.249 ..P WKT 2010 09 29 02 09 55 31.3200 -97.3300 251.000 122.0 125.514 3.950 -999.990 -999.990 1.255 ..P WKT 2010 09 29 02 14 55 31.3200 -97.3300 251.000 457.0 115.744 3.750 -999.990 -999.990 1.157 ..P WKT 2010 09 29 02 19 55 31.3200 -97.3300 251.000 30.0 122.002 3.700 -999.990 -999.990 1.220 ..P WKT 2010 09 29 02 24 55 31.3200 -97.3300 251.000 122.0 123.190 3.620 -999.990 -999.990 1.232 ..P WKT 2010 09 29 02 29 55 31.3200 -97.3300 251.000 457.0 109.851 3.990 -999.990 -999.990 1.099 ..P WKT 2010 09 29 02 39 55 31.3200 -97.3300 251.000 30.0 117.966 4.190 -999.990 -999.990 1.180 ..P WKT 2010 09 29 02 44 55 31.3200 -97.3300 251.000 122.0 124.346 3.460 -999.990 -999.990 1.243 ..P WKT 2010 09 29 02 49 55 31.3200 -97.3300 251.000 457.0 124.968 3.970 -999.990 -999.990 1.250 ..P WKT 2010 09 29 02 54 55 31.3200 -97.3300 251.000 30.0 125.179 3.820 -999.990 -999.990 1.252 ..P WKT 2010 09 29 02 59 55 31.3200 -97.3300 251.000 122.0 120.725 3.630 -999.990 -999.990 1.207 ..P WKT 2010 09 29 03 04 55 31.3200 -97.3300 251.000 457.0 125.326 4.050 -999.990 -999.990 1.253 ..P WKT 2010 09 29 03 14 55 31.3200 -97.3300 251.000 30.0 128.337 5.740 -999.990 -999.990 1.283 ..P WKT 2010 09 29 03 19 55 31.3200 -97.3300 251.000 122.0 121.528 4.320 -999.990 -999.990 1.215 ..P WKT 2010 09 29 03 24 55 31.3200 -97.3300 251.000 457.0 120.208 4.220 -999.990 -999.990 1.202 ..P WKT 2010 09 29 03 29 55 31.3200 -97.3300 251.000 30.0 121.360 3.780 -999.990 -999.990 1.214 ..P WKT 2010 09 29 03 34 55 31.3200 -97.3300 251.000 122.0 121.963 4.330 -999.990 -999.990 1.220 ..P WKT 2010 09 29 03 39 55 31.3200 -97.3300 251.000 457.0 117.346 4.390 -999.990 -999.990 1.173 ..P WKT 2010 09 29 03 49 55 31.3200 -97.3300 251.000 30.0 125.109 4.270 -999.990 -999.990 1.251 ..P WKT 2010 09 29 03 54 55 31.3200 -97.3300 251.000 122.0 125.673 4.530 -999.990 -999.990 1.257 ..P WKT 2010 09 29 03 59 55 31.3200 -97.3300 251.000 457.0 124.039 4.900 -999.990 -999.990 1.240 ..P WKT 2010 09 29 04 04 55 31.3200 -97.3300 251.000 30.0 118.829 5.380 -999.990 -999.990 1.188 ..P WKT 2010 09 29 04 09 55 31.3200 -97.3300 251.000 122.0 120.493 4.140 -999.990 -999.990 1.205 ..P WKT 2010 09 29 04 14 55 31.3200 -97.3300 251.000 457.0 125.458 4.280 -999.990 -999.990 1.255 ..P WKT 2010 09 29 04 24 55 31.3200 -97.3300 251.000 30.0 121.341 4.570 -999.990 -999.990 1.213 ..P WKT 2010 09 29 04 29 55 31.3200 -97.3300 251.000 122.0 128.766 4.270 -999.990 -999.990 1.288 ..P WKT 2010 09 29 04 34 55 31.3200 -97.3300 251.000 457.0 126.285 4.390 -999.990 -999.990 1.263 ..P WKT 2010 09 29 04 39 55 31.3200 -97.3300 251.000 30.0 116.370 4.440 -999.990 -999.990 1.164 ..P WKT 2010 09 29 04 44 55 31.3200 -97.3300 251.000 122.0 127.653 4.070 -999.990 -999.990 1.277 ..P WKT 2010 09 29 04 49 55 31.3200 -97.3300 251.000 457.0 122.279 4.150 -999.990 -999.990 1.223 ..P WKT 2010 09 29 05 04 55 31.3200 -97.3300 251.000 30.0 123.198 4.220 -999.990 -999.990 1.232 ..P WKT 2010 09 29 05 09 55 31.3200 -97.3300 251.000 122.0 122.627 4.320 -999.990 -999.990 1.226 ..P WKT 2010 09 29 05 14 55 31.3200 -97.3300 251.000 457.0 117.232 4.570 -999.990 -999.990 1.172 ..P WKT 2010 09 29 05 19 55 31.3200 -97.3300 251.000 30.0 131.683 4.580 -999.990 -999.990 1.317 ..P WKT 2010 09 29 05 24 55 31.3200 -97.3300 251.000 122.0 125.324 3.980 -999.990 -999.990 1.253 ..P WKT 2010 09 29 05 29 55 31.3200 -97.3300 251.000 457.0 125.856 4.030 -999.990 -999.990 1.259 ..P WKT 2010 09 29 05 39 55 31.3200 -97.3300 251.000 30.0 132.353 4.930 -999.990 -999.990 1.324 ..P WKT 2010 09 29 05 44 55 31.3200 -97.3300 251.000 122.0 128.389 4.750 -999.990 -999.990 1.284 ..P WKT 2010 09 29 05 49 55 31.3200 -97.3300 251.000 457.0 129.804 4.100 -999.990 -999.990 1.298 ..P WKT 2010 09 29 05 54 55 31.3200 -97.3300 251.000 30.0 137.428 4.490 -999.990 -999.990 1.374 ..P WKT 2010 09 29 05 59 55 31.3200 -97.3300 251.000 122.0 126.287 7.070 -999.990 -999.990 1.263 ..P WKT 2010 09 29 06 04 55 31.3200 -97.3300 251.000 457.0 125.356 4.300 -999.990 -999.990 1.254 ..P WKT 2010 09 29 06 14 55 31.3200 -97.3300 251.000 30.0 139.509 4.930 -999.990 -999.990 1.395 ..P WKT 2010 09 29 06 19 55 31.3200 -97.3300 251.000 122.0 125.046 4.460 -999.990 -999.990 1.250 ..P WKT 2010 09 29 06 24 55 31.3200 -97.3300 251.000 457.0 133.506 4.460 -999.990 -999.990 1.335 ..P WKT 2010 09 29 06 29 55 31.3200 -97.3300 251.000 30.0 128.569 4.750 -999.990 -999.990 1.286 ..P WKT 2010 09 29 06 34 55 31.3200 -97.3300 251.000 122.0 130.124 4.560 -999.990 -999.990 1.301 ..P WKT 2010 09 29 06 39 55 31.3200 -97.3300 251.000 457.0 128.087 5.050 -999.990 -999.990 1.281 ..P WKT 2010 09 29 06 49 55 31.3200 -97.3300 251.000 30.0 125.965 4.770 -999.990 -999.990 1.260 ..P WKT 2010 09 29 06 54 55 31.3200 -97.3300 251.000 122.0 131.274 4.680 -999.990 -999.990 1.313 ..P WKT 2010 09 29 06 59 55 31.3200 -97.3300 251.000 457.0 131.329 4.380 -999.990 -999.990 1.313 ..P WKT 2010 09 29 07 04 55 31.3200 -97.3300 251.000 30.0 125.853 4.030 -999.990 -999.990 1.259 ..P WKT 2010 09 29 07 09 55 31.3200 -97.3300 251.000 122.0 118.438 3.950 -999.990 -999.990 1.184 ..P WKT 2010 09 29 07 14 55 31.3200 -97.3300 251.000 457.0 132.326 3.780 -999.990 -999.990 1.323 ..P WKT 2010 09 29 07 24 55 31.3200 -97.3300 251.000 30.0 128.168 4.820 -999.990 -999.990 1.282 ..P WKT 2010 09 29 07 29 55 31.3200 -97.3300 251.000 122.0 118.416 5.060 -999.990 -999.990 1.184 ..P WKT 2010 09 29 07 34 55 31.3200 -97.3300 251.000 457.0 129.702 4.620 -999.990 -999.990 1.297 ..P WKT 2010 09 29 07 39 55 31.3200 -97.3300 251.000 30.0 117.177 4.030 -999.990 -999.990 1.172 ..P WKT 2010 09 29 07 44 55 31.3200 -97.3300 251.000 122.0 125.698 4.190 -999.990 -999.990 1.257 ..P WKT 2010 09 29 07 49 55 31.3200 -97.3300 251.000 457.0 129.235 4.060 -999.990 -999.990 1.292 ..P WKT 2010 09 29 07 59 55 31.3200 -97.3300 251.000 30.0 119.014 3.950 -999.990 -999.990 1.190 ..P WKT 2010 09 29 08 04 55 31.3200 -97.3300 251.000 122.0 126.313 4.780 -999.990 -999.990 1.263 ..P WKT 2010 09 29 08 09 55 31.3200 -97.3300 251.000 457.0 122.249 4.710 -999.990 -999.990 1.222 ..P WKT 2010 09 29 08 14 55 31.3200 -97.3300 251.000 30.0 120.125 5.210 -999.990 -999.990 1.201 ..P WKT 2010 09 29 08 19 55 31.3200 -97.3300 251.000 122.0 131.033 3.980 -999.990 -999.990 1.310 ..P WKT 2010 09 29 08 24 55 31.3200 -97.3300 251.000 457.0 119.203 4.130 -999.990 -999.990 1.192 ..P WKT 2010 09 29 08 34 55 31.3200 -97.3300 251.000 30.0 125.314 4.270 -999.990 -999.990 1.253 ..P WKT 2010 09 29 08 39 55 31.3200 -97.3300 251.000 122.0 132.167 4.380 -999.990 -999.990 1.322 ..P WKT 2010 09 29 08 44 55 31.3200 -97.3300 251.000 457.0 128.199 4.460 -999.990 -999.990 1.282 ..P WKT 2010 09 29 08 49 55 31.3200 -97.3300 251.000 30.0 137.691 4.620 -999.990 -999.990 1.377 ..P WKT 2010 09 29 08 54 55 31.3200 -97.3300 251.000 122.0 135.528 5.450 -999.990 -999.990 1.355 ..P WKT 2010 09 29 08 59 55 31.3200 -97.3300 251.000 457.0 125.033 7.310 -999.990 -999.990 1.250 ..P WKT 2010 09 29 09 09 55 31.3200 -97.3300 251.000 30.0 131.828 4.740 -999.990 -999.990 1.318 ..P WKT 2010 09 29 09 14 55 31.3200 -97.3300 251.000 122.0 132.876 4.500 -999.990 -999.990 1.329 ..P WKT 2010 09 29 09 19 55 31.3200 -97.3300 251.000 457.0 126.007 4.410 -999.990 -999.990 1.260 ..P WKT 2010 09 29 09 24 55 31.3200 -97.3300 251.000 30.0 137.474 4.680 -999.990 -999.990 1.375 ..P WKT 2010 09 29 09 29 55 31.3200 -97.3300 251.000 122.0 135.189 4.990 -999.990 -999.990 1.352 ..P WKT 2010 09 29 09 34 55 31.3200 -97.3300 251.000 457.0 120.394 4.630 -999.990 -999.990 1.204 ..P WKT 2010 09 29 09 44 55 31.3200 -97.3300 251.000 30.0 141.079 4.520 -999.990 -999.990 1.411 ..P WKT 2010 09 29 09 49 55 31.3200 -97.3300 251.000 122.0 158.776 4.500 -999.990 -999.990 1.588 ..P WKT 2010 09 29 09 54 55 31.3200 -97.3300 251.000 457.0 140.737 5.110 -999.990 -999.990 1.407 ..P WKT 2010 09 29 09 59 55 31.3200 -97.3300 251.000 30.0 144.947 5.390 -999.990 -999.990 1.449 ..P WKT 2010 09 29 10 04 55 31.3200 -97.3300 251.000 122.0 142.898 5.740 -999.990 -999.990 1.429 ..P WKT 2010 09 29 10 09 55 31.3200 -97.3300 251.000 457.0 127.909 4.540 -999.990 -999.990 1.279 ..P WKT 2010 09 29 10 19 55 31.3200 -97.3300 251.000 30.0 154.824 4.850 -999.990 -999.990 1.548 ..P WKT 2010 09 29 10 24 55 31.3200 -97.3300 251.000 122.0 149.415 4.990 -999.990 -999.990 1.494 ..P WKT 2010 09 29 10 29 55 31.3200 -97.3300 251.000 457.0 114.625 5.260 -999.990 -999.990 1.146 ..P WKT 2010 09 29 10 34 55 31.3200 -97.3300 251.000 30.0 160.733 5.710 -999.990 -999.990 1.607 ..P WKT 2010 09 29 10 39 55 31.3200 -97.3300 251.000 122.0 149.054 5.000 -999.990 -999.990 1.491 ..P WKT 2010 09 29 10 44 55 31.3200 -97.3300 251.000 457.0 114.247 4.680 -999.990 -999.990 1.142 ..P WKT 2010 09 29 10 54 55 31.3200 -97.3300 251.000 30.0 156.776 5.160 -999.990 -999.990 1.568 ..P WKT 2010 09 29 10 59 55 31.3200 -97.3300 251.000 122.0 139.235 5.250 -999.990 -999.990 1.392 ..P WKT 2010 09 29 11 04 55 31.3200 -97.3300 251.000 457.0 107.749 4.660 -999.990 -999.990 1.077 ..P WKT 2010 09 29 11 09 55 31.3200 -97.3300 251.000 30.0 164.644 4.920 -999.990 -999.990 1.646 ..P WKT 2010 09 29 11 14 55 31.3200 -97.3300 251.000 122.0 135.384 4.460 -999.990 -999.990 1.354 ..P WKT 2010 09 29 11 19 55 31.3200 -97.3300 251.000 457.0 116.433 4.300 -999.990 -999.990 1.164 ..P WKT 2010 09 29 11 29 55 31.3200 -97.3300 251.000 30.0 171.672 4.360 -999.990 -999.990 1.717 ..P WKT 2010 09 29 11 34 55 31.3200 -97.3300 251.000 122.0 133.707 4.160 -999.990 -999.990 1.337 ..P WKT 2010 09 29 11 39 55 31.3200 -97.3300 251.000 457.0 112.197 4.430 -999.990 -999.990 1.122 ..P WKT 2010 09 29 11 44 55 31.3200 -97.3300 251.000 30.0 174.428 4.410 -999.990 -999.990 1.744 ..P WKT 2010 09 29 11 49 55 31.3200 -97.3300 251.000 122.0 132.256 4.400 -999.990 -999.990 1.323 ..P WKT 2010 09 29 12 09 55 31.3200 -97.3300 251.000 457.0 108.303 6.060 -999.990 -999.990 1.083 ..P WKT 2010 09 29 12 10 25 31.3200 -97.3300 251.000 457.0 116.944 6.170 -999.990 -999.990 1.169 ..P WKT 2010 09 29 12 10 55 31.3200 -97.3300 251.000 457.0 111.068 5.300 -999.990 -999.990 1.111 ..P WKT 2010 09 29 12 11 25 31.3200 -97.3300 251.000 457.0 107.147 4.930 -999.990 -999.990 1.071 ..P WKT 2010 09 29 12 11 55 31.3200 -97.3300 251.000 457.0 108.250 5.760 -999.990 -999.990 1.083 ..P WKT 2010 09 29 12 12 25 31.3200 -97.3300 251.000 457.0 111.587 4.540 -999.990 -999.990 1.116 ..P WKT 2010 09 29 12 12 55 31.3200 -97.3300 251.000 457.0 113.527 4.870 -999.990 -999.990 1.135 ..P WKT 2010 09 29 12 13 25 31.3200 -97.3300 251.000 457.0 109.326 4.560 -999.990 -999.990 1.093 ..P WKT 2010 09 29 12 13 55 31.3200 -97.3300 251.000 457.0 110.988 4.360 -999.990 -999.990 1.110 ..P WKT 2010 09 29 12 14 25 31.3200 -97.3300 251.000 457.0 116.279 4.380 -999.990 -999.990 1.163 ..P WKT 2010 09 29 12 14 55 31.3200 -97.3300 251.000 457.0 110.961 4.630 -999.990 -999.990 1.110 ..P WKT 2010 09 29 12 19 55 31.3200 -97.3300 251.000 30.0 171.947 4.720 -999.990 -999.990 1.719 ..P WKT 2010 09 29 12 24 55 31.3200 -97.3300 251.000 122.0 125.483 4.560 -999.990 -999.990 1.255 ..P WKT 2010 09 29 12 29 55 31.3200 -97.3300 251.000 457.0 114.745 4.750 -999.990 -999.990 1.147 ..P WKT 2010 09 29 12 34 55 31.3200 -97.3300 251.000 30.0 174.301 4.890 -999.990 -999.990 1.743 ..P WKT 2010 09 29 12 39 55 31.3200 -97.3300 251.000 122.0 125.632 5.610 -999.990 -999.990 1.256 ..P WKT 2010 09 29 12 44 55 31.3200 -97.3300 251.000 457.0 112.809 4.750 -999.990 -999.990 1.128 ..P WKT 2010 09 29 12 54 55 31.3200 -97.3300 251.000 30.0 178.023 5.180 -999.990 -999.990 1.780 ..P WKT 2010 09 29 12 59 55 31.3200 -97.3300 251.000 122.0 121.711 5.020 -999.990 -999.990 1.217 ..P WKT 2010 09 29 13 04 55 31.3200 -97.3300 251.000 457.0 110.695 4.870 -999.990 -999.990 1.107 ..P WKT 2010 09 29 13 09 55 31.3200 -97.3300 251.000 30.0 176.423 5.610 -999.990 -999.990 1.764 ..P WKT 2010 09 29 13 14 55 31.3200 -97.3300 251.000 122.0 122.651 4.860 -999.990 -999.990 1.227 ..P WKT 2010 09 29 13 19 55 31.3200 -97.3300 251.000 457.0 116.095 5.200 -999.990 -999.990 1.161 ..P WKT 2010 09 29 13 29 55 31.3200 -97.3300 251.000 30.0 176.552 4.830 -999.990 -999.990 1.766 ..P WKT 2010 09 29 13 34 55 31.3200 -97.3300 251.000 122.0 125.406 5.050 -999.990 -999.990 1.254 ..P WKT 2010 09 29 13 39 55 31.3200 -97.3300 251.000 457.0 111.283 4.920 -999.990 -999.990 1.113 ..P WKT 2010 09 29 13 44 55 31.3200 -97.3300 251.000 30.0 180.759 5.520 -999.990 -999.990 1.808 ..P WKT 2010 09 29 13 49 55 31.3200 -97.3300 251.000 122.0 124.355 4.120 -999.990 -999.990 1.244 ..P WKT 2010 09 29 13 54 55 31.3200 -97.3300 251.000 457.0 116.775 4.370 -999.990 -999.990 1.168 ..P WKT 2010 09 29 14 04 55 31.3200 -97.3300 251.000 30.0 173.003 4.520 -999.990 -999.990 1.730 ..P WKT 2010 09 29 14 09 55 31.3200 -97.3300 251.000 122.0 116.446 4.240 -999.990 -999.990 1.164 ..P WKT 2010 09 29 14 14 55 31.3200 -97.3300 251.000 457.0 117.150 4.430 -999.990 -999.990 1.171 ..P WKT 2010 09 29 14 19 55 31.3200 -97.3300 251.000 30.0 168.414 4.330 -999.990 -999.990 1.684 ..P WKT 2010 09 29 14 24 55 31.3200 -97.3300 251.000 122.0 125.084 4.500 -999.990 -999.990 1.251 ..P WKT 2010 09 29 14 29 55 31.3200 -97.3300 251.000 457.0 126.619 4.610 -999.990 -999.990 1.266 ..P WKT 2010 09 29 14 39 55 31.3200 -97.3300 251.000 30.0 161.233 4.070 -999.990 -999.990 1.612 ..P WKT 2010 09 29 14 44 55 31.3200 -97.3300 251.000 122.0 131.160 5.850 -999.990 -999.990 1.312 ..P WKT 2010 09 29 14 49 55 31.3200 -97.3300 251.000 457.0 130.929 4.280 -999.990 -999.990 1.309 ..P WKT 2010 09 29 14 54 55 31.3200 -97.3300 251.000 30.0 149.286 4.680 -999.990 -999.990 1.493 ..P WKT 2010 09 29 14 59 55 31.3200 -97.3300 251.000 122.0 129.634 5.720 -999.990 -999.990 1.296 ..P WKT 2010 09 29 15 04 55 31.3200 -97.3300 251.000 457.0 130.790 3.750 -999.990 -999.990 1.308 ..P WKT 2010 09 29 15 14 55 31.3200 -97.3300 251.000 30.0 145.158 3.720 -999.990 -999.990 1.452 ..P WKT 2010 09 29 15 19 55 31.3200 -97.3300 251.000 122.0 146.171 5.350 -999.990 -999.990 1.462 ..P WKT 2010 09 29 15 24 55 31.3200 -97.3300 251.000 457.0 130.003 4.410 -999.990 -999.990 1.300 ..P WKT 2010 09 29 15 29 55 31.3200 -97.3300 251.000 30.0 138.777 4.110 -999.990 -999.990 1.388 ..P WKT 2010 09 29 15 34 55 31.3200 -97.3300 251.000 122.0 152.257 4.850 -999.990 -999.990 1.523 ..P WKT 2010 09 29 15 39 55 31.3200 -97.3300 251.000 457.0 123.356 4.400 -999.990 -999.990 1.234 ..P WKT 2010 09 29 15 49 55 31.3200 -97.3300 251.000 30.0 143.819 4.590 -999.990 -999.990 1.438 ..P WKT 2010 09 29 15 54 55 31.3200 -97.3300 251.000 122.0 143.606 4.540 -999.990 -999.990 1.436 ..P WKT 2010 09 29 15 59 55 31.3200 -97.3300 251.000 457.0 112.397 3.860 -999.990 -999.990 1.124 ..P WKT 2010 09 29 16 04 55 31.3200 -97.3300 251.000 30.0 145.669 3.950 -999.990 -999.990 1.457 ..P WKT 2010 09 29 16 09 55 31.3200 -97.3300 251.000 122.0 147.668 4.090 -999.990 -999.990 1.477 ..P WKT 2010 09 29 16 14 55 31.3200 -97.3300 251.000 457.0 115.923 3.910 -999.990 -999.990 1.159 ..P WKT 2010 09 29 16 24 55 31.3200 -97.3300 251.000 30.0 139.147 3.710 -999.990 -999.990 1.391 ..P WKT 2010 09 29 16 29 55 31.3200 -97.3300 251.000 122.0 142.942 3.720 -999.990 -999.990 1.429 ..P WKT 2010 09 29 16 34 55 31.3200 -97.3300 251.000 457.0 139.275 4.650 -999.990 -999.990 1.393 ..P WKT 2010 09 29 16 39 55 31.3200 -97.3300 251.000 30.0 143.345 4.060 -999.990 -999.990 1.433 ..P WKT 2010 09 29 16 44 55 31.3200 -97.3300 251.000 122.0 137.331 3.830 -999.990 -999.990 1.373 ..P WKT 2010 09 29 16 49 55 31.3200 -97.3300 251.000 457.0 123.998 4.320 -999.990 -999.990 1.240 ..P WKT 2010 09 29 17 04 55 31.3200 -97.3300 251.000 30.0 121.211 4.230 -999.990 -999.990 1.212 ..P WKT 2010 09 29 17 09 55 31.3200 -97.3300 251.000 122.0 121.580 3.850 -999.990 -999.990 1.216 ..P WKT 2010 09 29 17 14 55 31.3200 -97.3300 251.000 457.0 113.945 3.890 -999.990 -999.990 1.139 ..P WKT 2010 09 29 17 19 55 31.3200 -97.3300 251.000 30.0 113.624 4.290 -999.990 -999.990 1.136 ..P WKT 2010 09 29 17 24 55 31.3200 -97.3300 251.000 122.0 117.717 4.100 -999.990 -999.990 1.177 ..P WKT 2010 09 29 17 29 55 31.3200 -97.3300 251.000 457.0 121.533 4.910 -999.990 -999.990 1.215 ..P WKT 2010 09 29 17 39 55 31.3200 -97.3300 251.000 30.0 119.309 3.830 -999.990 -999.990 1.193 ..P WKT 2010 09 29 17 44 55 31.3200 -97.3300 251.000 122.0 124.161 4.030 -999.990 -999.990 1.242 ..P WKT 2010 09 29 17 49 55 31.3200 -97.3300 251.000 457.0 126.532 3.840 -999.990 -999.990 1.265 ..P WKT 2010 09 29 17 54 55 31.3200 -97.3300 251.000 30.0 120.772 5.420 -999.990 -999.990 1.208 ..P WKT 2010 09 29 17 59 55 31.3200 -97.3300 251.000 122.0 121.351 3.880 -999.990 -999.990 1.214 ..P WKT 2010 09 29 18 04 55 31.3200 -97.3300 251.000 457.0 118.073 4.240 -999.990 -999.990 1.181 ..P WKT 2010 09 29 18 14 55 31.3200 -97.3300 251.000 30.0 118.209 4.540 -999.990 -999.990 1.182 ..P WKT 2010 09 29 18 19 55 31.3200 -97.3300 251.000 122.0 129.327 3.920 -999.990 -999.990 1.293 ..P WKT 2010 09 29 18 24 55 31.3200 -97.3300 251.000 457.0 125.992 5.670 -999.990 -999.990 1.260 ..P WKT 2010 09 29 18 29 55 31.3200 -97.3300 251.000 30.0 124.584 4.160 -999.990 -999.990 1.246 ..P WKT 2010 09 29 18 34 55 31.3200 -97.3300 251.000 122.0 124.552 3.950 -999.990 -999.990 1.246 ..P WKT 2010 09 29 18 39 55 31.3200 -97.3300 251.000 457.0 118.744 4.330 -999.990 -999.990 1.187 ..P WKT 2010 09 29 18 49 55 31.3200 -97.3300 251.000 30.0 128.130 3.730 -999.990 -999.990 1.281 ..P WKT 2010 09 29 18 54 55 31.3200 -97.3300 251.000 122.0 133.419 4.420 -999.990 -999.990 1.334 ..P WKT 2010 09 29 18 59 55 31.3200 -97.3300 251.000 457.0 125.788 4.000 -999.990 -999.990 1.258 ..P WKT 2010 09 29 19 04 55 31.3200 -97.3300 251.000 30.0 125.854 3.500 -999.990 -999.990 1.259 ..P WKT 2010 09 29 19 09 55 31.3200 -97.3300 251.000 122.0 130.316 3.540 -999.990 -999.990 1.303 ..P WKT 2010 09 29 19 14 55 31.3200 -97.3300 251.000 457.0 121.866 3.240 -999.990 -999.990 1.219 ..P WKT 2010 09 29 19 24 55 31.3200 -97.3300 251.000 30.0 118.901 3.530 -999.990 -999.990 1.189 ..P WKT 2010 09 29 19 29 55 31.3200 -97.3300 251.000 122.0 128.499 3.340 -999.990 -999.990 1.285 ..P WKT 2010 09 29 19 34 55 31.3200 -97.3300 251.000 457.0 133.152 3.490 -999.990 -999.990 1.332 ..P WKT 2010 09 29 19 39 55 31.3200 -97.3300 251.000 30.0 129.022 4.640 -999.990 -999.990 1.290 ..P WKT 2010 09 29 19 44 55 31.3200 -97.3300 251.000 122.0 130.381 3.820 -999.990 -999.990 1.304 ..P WKT 2010 09 29 19 49 55 31.3200 -97.3300 251.000 457.0 131.190 3.960 -999.990 -999.990 1.312 ..P WKT 2010 09 29 19 59 55 31.3200 -97.3300 251.000 30.0 136.022 4.390 -999.990 -999.990 1.360 ..P WKT 2010 09 29 20 04 55 31.3200 -97.3300 251.000 122.0 130.720 3.760 -999.990 -999.990 1.307 ..P WKT 2010 09 29 20 09 55 31.3200 -97.3300 251.000 457.0 127.065 3.450 -999.990 -999.990 1.271 ..P WKT 2010 09 29 20 14 55 31.3200 -97.3300 251.000 30.0 124.782 3.250 -999.990 -999.990 1.248 ..P WKT 2010 09 29 20 19 55 31.3200 -97.3300 251.000 122.0 130.720 4.810 -999.990 -999.990 1.307 ..P WKT 2010 09 29 20 24 55 31.3200 -97.3300 251.000 457.0 128.985 3.490 -999.990 -999.990 1.290 ..P WKT 2010 09 29 20 34 55 31.3200 -97.3300 251.000 30.0 125.692 2.970 -999.990 -999.990 1.257 ..P WKT 2010 09 29 20 39 55 31.3200 -97.3300 251.000 122.0 135.498 3.460 -999.990 -999.990 1.355 ..P WKT 2010 09 29 20 44 55 31.3200 -97.3300 251.000 457.0 128.464 3.480 -999.990 -999.990 1.285 ..P WKT 2010 09 29 20 49 55 31.3200 -97.3300 251.000 30.0 140.455 3.940 -999.990 -999.990 1.405 ..P WKT 2010 09 29 20 54 55 31.3200 -97.3300 251.000 122.0 133.012 4.550 -999.990 -999.990 1.330 ..P WKT 2010 09 29 20 59 55 31.3200 -97.3300 251.000 457.0 130.908 4.500 -999.990 -999.990 1.309 ..P WKT 2010 09 29 21 09 55 31.3200 -97.3300 251.000 30.0 126.954 4.480 -999.990 -999.990 1.270 ..P WKT 2010 09 29 21 14 55 31.3200 -97.3300 251.000 122.0 131.942 4.410 -999.990 -999.990 1.319 ..P WKT 2010 09 29 21 19 55 31.3200 -97.3300 251.000 457.0 130.503 4.810 -999.990 -999.990 1.305 ..P WKT 2010 09 29 21 24 55 31.3200 -97.3300 251.000 30.0 132.755 4.560 -999.990 -999.990 1.328 ..P WKT 2010 09 29 21 29 55 31.3200 -97.3300 251.000 122.0 132.409 4.760 -999.990 -999.990 1.324 ..P WKT 2010 09 29 21 34 55 31.3200 -97.3300 251.000 457.0 130.697 4.330 -999.990 -999.990 1.307 ..P WKT 2010 09 29 21 44 55 31.3200 -97.3300 251.000 30.0 131.705 4.660 -999.990 -999.990 1.317 ..P WKT 2010 09 29 21 49 55 31.3200 -97.3300 251.000 122.0 127.459 4.160 -999.990 -999.990 1.275 ..P WKT 2010 09 29 21 54 55 31.3200 -97.3300 251.000 457.0 123.351 4.180 -999.990 -999.990 1.234 ..P WKT 2010 09 29 21 59 55 31.3200 -97.3300 251.000 30.0 126.342 3.810 -999.990 -999.990 1.263 ..P WKT 2010 09 29 22 04 55 31.3200 -97.3300 251.000 122.0 126.330 3.750 -999.990 -999.990 1.263 ..P WKT 2010 09 29 22 09 55 31.3200 -97.3300 251.000 457.0 129.183 3.520 -999.990 -999.990 1.292 ..P WKT 2010 09 29 22 19 55 31.3200 -97.3300 251.000 30.0 121.285 3.620 -999.990 -999.990 1.213 ..P WKT 2010 09 29 22 24 55 31.3200 -97.3300 251.000 122.0 129.085 3.440 -999.990 -999.990 1.291 ..P WKT 2010 09 29 22 29 55 31.3200 -97.3300 251.000 457.0 125.431 3.800 -999.990 -999.990 1.254 ..P WKT 2010 09 29 22 34 55 31.3200 -97.3300 251.000 30.0 123.004 3.660 -999.990 -999.990 1.230 ..P WKT 2010 09 29 22 39 55 31.3200 -97.3300 251.000 122.0 133.934 3.670 -999.990 -999.990 1.339 ..P WKT 2010 09 29 22 44 55 31.3200 -97.3300 251.000 457.0 130.417 4.230 -999.990 -999.990 1.304 ..P WKT 2010 09 29 22 54 55 31.3200 -97.3300 251.000 30.0 129.262 4.780 -999.990 -999.990 1.293 ..P WKT 2010 09 29 22 59 55 31.3200 -97.3300 251.000 122.0 132.712 3.790 -999.990 -999.990 1.327 ..P WKT 2010 09 29 23 04 55 31.3200 -97.3300 251.000 457.0 129.353 5.740 -999.990 -999.990 1.294 ..P WKT 2010 09 29 23 09 55 31.3200 -97.3300 251.000 30.0 137.430 3.930 -999.990 -999.990 1.374 ..P WKT 2010 09 29 23 14 55 31.3200 -97.3300 251.000 122.0 135.705 4.740 -999.990 -999.990 1.357 ..P WKT 2010 09 29 23 19 55 31.3200 -97.3300 251.000 457.0 132.347 4.140 -999.990 -999.990 1.323 ..P WKT 2010 09 29 23 29 55 31.3200 -97.3300 251.000 30.0 146.355 5.140 -999.990 -999.990 1.464 ..P WKT 2010 09 29 23 34 55 31.3200 -97.3300 251.000 122.0 139.777 3.470 -999.990 -999.990 1.398 ..P WKT 2010 09 29 23 39 55 31.3200 -97.3300 251.000 457.0 133.474 3.540 -999.990 -999.990 1.335 ..P WKT 2010 09 29 23 44 55 31.3200 -97.3300 251.000 30.0 140.224 3.820 -999.990 -999.990 1.402 ..P WKT 2010 09 29 23 49 55 31.3200 -97.3300 251.000 122.0 143.981 3.300 -999.990 -999.990 1.440 ..P WKT 2010 09 30 00 09 55 31.3200 -97.3300 251.000 457.0 142.696 3.730 -999.990 -999.990 1.427 ..P WKT 2010 09 30 00 10 25 31.3200 -97.3300 251.000 457.0 138.070 3.950 -999.990 -999.990 1.381 ..P WKT 2010 09 30 00 10 55 31.3200 -97.3300 251.000 457.0 137.248 3.590 -999.990 -999.990 1.372 ..P WKT 2010 09 30 00 11 25 31.3200 -97.3300 251.000 457.0 136.153 2.590 -999.990 -999.990 1.362 ..P WKT 2010 09 30 00 11 55 31.3200 -97.3300 251.000 457.0 139.950 2.670 -999.990 -999.990 1.399 ..P WKT 2010 09 30 00 12 25 31.3200 -97.3300 251.000 457.0 141.573 3.270 -999.990 -999.990 1.416 ..P WKT 2010 09 30 00 12 55 31.3200 -97.3300 251.000 457.0 138.849 3.080 -999.990 -999.990 1.388 ..P WKT 2010 09 30 00 13 25 31.3200 -97.3300 251.000 457.0 138.570 3.490 -999.990 -999.990 1.386 ..P WKT 2010 09 30 00 13 55 31.3200 -97.3300 251.000 457.0 139.921 2.680 -999.990 -999.990 1.399 ..P WKT 2010 09 30 00 14 25 31.3200 -97.3300 251.000 457.0 143.175 2.940 -999.990 -999.990 1.432 ..P WKT 2010 09 30 00 14 55 31.3200 -97.3300 251.000 457.0 140.722 2.690 -999.990 -999.990 1.407 ..P WKT 2010 09 30 00 19 55 31.3200 -97.3300 251.000 30.0 144.725 2.990 -999.990 -999.990 1.447 ..P WKT 2010 09 30 00 24 55 31.3200 -97.3300 251.000 122.0 150.629 3.490 -999.990 -999.990 1.506 ..P WKT 2010 09 30 00 29 55 31.3200 -97.3300 251.000 457.0 146.754 2.930 -999.990 -999.990 1.468 ..P WKT 2010 09 30 00 34 55 31.3200 -97.3300 251.000 30.0 151.164 3.720 -999.990 -999.990 1.512 ..P WKT 2010 09 30 00 39 55 31.3200 -97.3300 251.000 122.0 150.276 4.630 -999.990 -999.990 1.503 ..P WKT 2010 09 30 00 44 55 31.3200 -97.3300 251.000 457.0 144.093 3.160 -999.990 -999.990 1.441 ..P WKT 2010 09 30 00 54 55 31.3200 -97.3300 251.000 30.0 152.034 3.380 -999.990 -999.990 1.520 ..P WKT 2010 09 30 00 59 55 31.3200 -97.3300 251.000 122.0 146.742 4.270 -999.990 -999.990 1.467 ..P WKT 2010 09 30 01 04 55 31.3200 -97.3300 251.000 457.0 142.672 4.290 -999.990 -999.990 1.427 ..P WKT 2010 09 30 01 09 55 31.3200 -97.3300 251.000 30.0 152.178 4.120 -999.990 -999.990 1.522 ..P WKT 2010 09 30 01 14 55 31.3200 -97.3300 251.000 122.0 143.901 5.170 -999.990 -999.990 1.439 ..P WKT 2010 09 30 01 19 55 31.3200 -97.3300 251.000 457.0 143.904 4.630 -999.990 -999.990 1.439 ..P WKT 2010 09 30 01 29 55 31.3200 -97.3300 251.000 30.0 143.968 4.500 -999.990 -999.990 1.440 ..P WKT 2010 09 30 01 34 55 31.3200 -97.3300 251.000 122.0 143.080 4.480 -999.990 -999.990 1.431 ..P WKT 2010 09 30 01 39 55 31.3200 -97.3300 251.000 457.0 135.134 5.280 -999.990 -999.990 1.351 ..P WKT 2010 09 30 01 44 55 31.3200 -97.3300 251.000 30.0 147.409 3.570 -999.990 -999.990 1.474 ..P WKT 2010 09 30 01 49 55 31.3200 -97.3300 251.000 122.0 142.721 3.670 -999.990 -999.990 1.427 ..P WKT 2010 09 30 01 54 55 31.3200 -97.3300 251.000 457.0 138.712 3.060 -999.990 -999.990 1.387 ..P WKT 2010 09 30 02 04 55 31.3200 -97.3300 251.000 30.0 156.975 3.090 -999.990 -999.990 1.570 ..P WKT 2010 09 30 02 09 55 31.3200 -97.3300 251.000 122.0 162.695 3.450 -999.990 -999.990 1.627 ..P WKT 2010 09 30 02 14 55 31.3200 -97.3300 251.000 457.0 135.180 4.480 -999.990 -999.990 1.352 ..P WKT 2010 09 30 02 19 55 31.3200 -97.3300 251.000 30.0 171.012 5.890 -999.990 -999.990 1.710 ..P WKT 2010 09 30 02 24 55 31.3200 -97.3300 251.000 122.0 133.056 6.050 -999.990 -999.990 1.331 ..P WKT 2010 09 30 02 29 55 31.3200 -97.3300 251.000 457.0 124.127 3.700 -999.990 -999.990 1.241 ..P WKT 2010 09 30 02 39 55 31.3200 -97.3300 251.000 30.0 159.608 4.990 -999.990 -999.990 1.596 ..P WKT 2010 09 30 02 44 55 31.3200 -97.3300 251.000 122.0 128.615 4.890 -999.990 -999.990 1.286 ..P WKT 2010 09 30 02 49 55 31.3200 -97.3300 251.000 457.0 136.678 5.980 -999.990 -999.990 1.367 ..P WKT 2010 09 30 02 54 55 31.3200 -97.3300 251.000 30.0 166.704 5.580 -999.990 -999.990 1.667 ..P WKT 2010 09 30 02 59 55 31.3200 -97.3300 251.000 122.0 132.463 4.280 -999.990 -999.990 1.325 ..P WKT 2010 09 30 03 04 55 31.3200 -97.3300 251.000 457.0 140.794 3.340 -999.990 -999.990 1.408 ..P WKT 2010 09 30 03 14 55 31.3200 -97.3300 251.000 30.0 180.421 3.260 -999.990 -999.990 1.804 ..P WKT 2010 09 30 03 19 55 31.3200 -97.3300 251.000 122.0 127.134 4.390 -999.990 -999.990 1.271 ..P WKT 2010 09 30 03 24 55 31.3200 -97.3300 251.000 457.0 145.958 5.030 -999.990 -999.990 1.460 ..P WKT 2010 09 30 03 29 55 31.3200 -97.3300 251.000 30.0 173.996 4.890 -999.990 -999.990 1.740 ..P WKT 2010 09 30 03 34 55 31.3200 -97.3300 251.000 122.0 120.720 3.960 -999.990 -999.990 1.207 ..P WKT 2010 09 30 03 39 55 31.3200 -97.3300 251.000 457.0 142.251 2.270 -999.990 -999.990 1.423 ..P WKT 2010 09 30 03 49 55 31.3200 -97.3300 251.000 30.0 168.079 3.620 -999.990 -999.990 1.681 ..P WKT 2010 09 30 03 54 55 31.3200 -97.3300 251.000 122.0 127.396 2.690 -999.990 -999.990 1.274 ..P WKT 2010 09 30 03 59 55 31.3200 -97.3300 251.000 457.0 147.683 2.940 -999.990 -999.990 1.477 ..P WKT 2010 09 30 04 04 55 31.3200 -97.3300 251.000 30.0 166.071 3.340 -999.990 -999.990 1.661 ..P WKT 2010 09 30 04 09 55 31.3200 -97.3300 251.000 122.0 132.982 3.510 -999.990 -999.990 1.330 ..P WKT 2010 09 30 04 14 55 31.3200 -97.3300 251.000 457.0 140.803 3.360 -999.990 -999.990 1.408 ..P WKT 2010 09 30 04 24 55 31.3200 -97.3300 251.000 30.0 167.259 4.820 -999.990 -999.990 1.673 ..P WKT 2010 09 30 04 29 55 31.3200 -97.3300 251.000 122.0 128.064 3.330 -999.990 -999.990 1.281 ..P WKT 2010 09 30 04 34 55 31.3200 -97.3300 251.000 457.0 150.625 3.740 -999.990 -999.990 1.506 ..P WKT 2010 09 30 04 39 55 31.3200 -97.3300 251.000 30.0 159.101 4.000 -999.990 -999.990 1.591 ..P WKT 2010 09 30 04 44 55 31.3200 -97.3300 251.000 122.0 120.049 3.500 -999.990 -999.990 1.200 ..P WKT 2010 09 30 04 49 55 31.3200 -97.3300 251.000 457.0 155.604 3.480 -999.990 -999.990 1.556 ..P WKT 2010 09 30 05 04 55 31.3200 -97.3300 251.000 30.0 151.695 3.280 -999.990 -999.990 1.517 ..P WKT 2010 09 30 05 09 55 31.3200 -97.3300 251.000 122.0 113.154 3.620 -999.990 -999.990 1.132 ..P WKT 2010 09 30 05 14 55 31.3200 -97.3300 251.000 457.0 153.663 3.700 -999.990 -999.990 1.537 ..P WKT 2010 09 30 05 19 55 31.3200 -97.3300 251.000 30.0 163.309 3.090 -999.990 -999.990 1.633 ..P WKT 2010 09 30 05 24 55 31.3200 -97.3300 251.000 122.0 122.203 3.500 -999.990 -999.990 1.222 ..P WKT 2010 09 30 05 29 55 31.3200 -97.3300 251.000 457.0 159.457 3.380 -999.990 -999.990 1.595 ..P WKT 2010 09 30 05 39 55 31.3200 -97.3300 251.000 30.0 166.338 2.880 -999.990 -999.990 1.663 ..P WKT 2010 09 30 05 44 55 31.3200 -97.3300 251.000 122.0 127.179 2.780 -999.990 -999.990 1.272 ..P WKT 2010 09 30 05 49 55 31.3200 -97.3300 251.000 457.0 168.120 3.320 -999.990 -999.990 1.681 ..P WKT 2010 09 30 05 54 55 31.3200 -97.3300 251.000 30.0 170.364 4.520 -999.990 -999.990 1.704 ..P WKT 2010 09 30 05 59 55 31.3200 -97.3300 251.000 122.0 122.825 2.300 -999.990 -999.990 1.228 ..P WKT 2010 09 30 06 04 55 31.3200 -97.3300 251.000 457.0 177.285 4.270 -999.990 -999.990 1.773 ..P WKT 2010 09 30 06 14 55 31.3200 -97.3300 251.000 30.0 149.097 2.200 -999.990 -999.990 1.491 ..P WKT 2010 09 30 06 19 55 31.3200 -97.3300 251.000 122.0 125.026 2.790 -999.990 -999.990 1.250 ..P WKT 2010 09 30 06 24 55 31.3200 -97.3300 251.000 457.0 127.058 2.360 -999.990 -999.990 1.271 ..P WKT 2010 09 30 06 29 55 31.3200 -97.3300 251.000 30.0 143.290 3.150 -999.990 -999.990 1.433 ..P WKT 2010 09 30 06 34 55 31.3200 -97.3300 251.000 122.0 120.847 2.560 -999.990 -999.990 1.208 ..P WKT 2010 09 30 06 39 55 31.3200 -97.3300 251.000 457.0 114.902 4.420 -999.990 -999.990 1.149 ..P WKT 2010 09 30 06 49 55 31.3200 -97.3300 251.000 30.0 139.363 2.350 -999.990 -999.990 1.394 ..P WKT 2010 09 30 06 54 55 31.3200 -97.3300 251.000 122.0 131.101 2.390 -999.990 -999.990 1.311 ..P WKT 2010 09 30 06 59 55 31.3200 -97.3300 251.000 457.0 115.269 2.690 -999.990 -999.990 1.153 ..P WKT 2010 09 30 07 04 55 31.3200 -97.3300 251.000 30.0 140.802 3.190 -999.990 -999.990 1.408 ..P WKT 2010 09 30 07 09 55 31.3200 -97.3300 251.000 122.0 118.755 3.410 -999.990 -999.990 1.188 ..P WKT 2010 09 30 07 14 55 31.3200 -97.3300 251.000 457.0 114.010 2.230 -999.990 -999.990 1.140 ..P WKT 2010 09 30 07 24 55 31.3200 -97.3300 251.000 30.0 154.561 2.830 -999.990 -999.990 1.546 ..P WKT 2010 09 30 07 29 55 31.3200 -97.3300 251.000 122.0 125.530 4.360 -999.990 -999.990 1.255 ..P WKT 2010 09 30 07 34 55 31.3200 -97.3300 251.000 457.0 112.177 3.150 -999.990 -999.990 1.122 ..P WKT 2010 09 30 07 39 55 31.3200 -97.3300 251.000 30.0 156.653 3.750 -999.990 -999.990 1.567 ..P WKT 2010 09 30 07 44 55 31.3200 -97.3300 251.000 122.0 118.711 3.680 -999.990 -999.990 1.187 ..P WKT 2010 09 30 07 49 55 31.3200 -97.3300 251.000 457.0 115.088 3.420 -999.990 -999.990 1.151 ..P WKT 2010 09 30 07 59 55 31.3200 -97.3300 251.000 30.0 152.572 3.800 -999.990 -999.990 1.526 ..P WKT 2010 09 30 08 04 55 31.3200 -97.3300 251.000 122.0 118.576 3.200 -999.990 -999.990 1.186 ..P WKT 2010 09 30 08 09 55 31.3200 -97.3300 251.000 457.0 112.947 3.520 -999.990 -999.990 1.129 ..P WKT 2010 09 30 08 14 55 31.3200 -97.3300 251.000 30.0 153.236 3.670 -999.990 -999.990 1.532 ..P WKT 2010 09 30 08 19 55 31.3200 -97.3300 251.000 122.0 120.596 3.470 -999.990 -999.990 1.206 ..P WKT 2010 09 30 08 24 55 31.3200 -97.3300 251.000 457.0 119.289 3.050 -999.990 -999.990 1.193 ..P WKT 2010 09 30 08 34 55 31.3200 -97.3300 251.000 30.0 152.359 2.820 -999.990 -999.990 1.524 ..P WKT 2010 09 30 08 39 55 31.3200 -97.3300 251.000 122.0 120.306 2.960 -999.990 -999.990 1.203 ..P WKT 2010 09 30 08 44 55 31.3200 -97.3300 251.000 457.0 113.638 4.330 -999.990 -999.990 1.136 ..P WKT 2010 09 30 08 49 55 31.3200 -97.3300 251.000 30.0 147.469 2.720 -999.990 -999.990 1.475 ..P WKT 2010 09 30 08 54 55 31.3200 -97.3300 251.000 122.0 121.226 3.420 -999.990 -999.990 1.212 ..P WKT 2010 09 30 08 59 55 31.3200 -97.3300 251.000 457.0 109.565 4.510 -999.990 -999.990 1.096 ..P WKT 2010 09 30 09 09 55 31.3200 -97.3300 251.000 30.0 152.880 3.410 -999.990 -999.990 1.529 ..P WKT 2010 09 30 09 14 55 31.3200 -97.3300 251.000 122.0 116.213 3.000 -999.990 -999.990 1.162 ..P WKT 2010 09 30 09 19 55 31.3200 -97.3300 251.000 457.0 113.422 3.350 -999.990 -999.990 1.134 ..P WKT 2010 09 30 09 24 55 31.3200 -97.3300 251.000 30.0 150.439 3.680 -999.990 -999.990 1.504 ..P WKT 2010 09 30 09 29 55 31.3200 -97.3300 251.000 122.0 114.724 4.090 -999.990 -999.990 1.147 ..P WKT 2010 09 30 09 34 55 31.3200 -97.3300 251.000 457.0 115.982 4.020 -999.990 -999.990 1.160 ..P WKT 2010 09 30 09 44 55 31.3200 -97.3300 251.000 30.0 158.101 4.630 -999.990 -999.990 1.581 ..P WKT 2010 09 30 09 49 55 31.3200 -97.3300 251.000 122.0 125.844 5.130 -999.990 -999.990 1.258 ..P WKT 2010 09 30 09 54 55 31.3200 -97.3300 251.000 457.0 113.420 3.000 -999.990 -999.990 1.134 ..P WKT 2010 09 30 09 59 55 31.3200 -97.3300 251.000 30.0 155.488 2.950 -999.990 -999.990 1.555 ..P WKT 2010 09 30 10 04 55 31.3200 -97.3300 251.000 122.0 116.493 3.010 -999.990 -999.990 1.165 ..P WKT 2010 09 30 10 09 55 31.3200 -97.3300 251.000 457.0 103.667 2.580 -999.990 -999.990 1.037 ..P WKT 2010 09 30 10 19 55 31.3200 -97.3300 251.000 30.0 153.012 3.190 -999.990 -999.990 1.530 ..P WKT 2010 09 30 10 24 55 31.3200 -97.3300 251.000 122.0 123.486 2.340 -999.990 -999.990 1.235 ..P WKT 2010 09 30 10 29 55 31.3200 -97.3300 251.000 457.0 110.007 2.540 -999.990 -999.990 1.100 ..P WKT 2010 09 30 10 34 55 31.3200 -97.3300 251.000 30.0 152.077 2.020 -999.990 -999.990 1.521 ..P WKT 2010 09 30 10 39 55 31.3200 -97.3300 251.000 122.0 125.656 1.830 -999.990 -999.990 1.257 ..P WKT 2010 09 30 10 44 55 31.3200 -97.3300 251.000 457.0 119.999 2.410 -999.990 -999.990 1.200 ..P WKT 2010 09 30 10 54 55 31.3200 -97.3300 251.000 30.0 156.285 2.920 -999.990 -999.990 1.563 ..P WKT 2010 09 30 10 59 55 31.3200 -97.3300 251.000 122.0 120.860 1.760 -999.990 -999.990 1.209 ..P WKT 2010 09 30 11 04 55 31.3200 -97.3300 251.000 457.0 140.156 2.810 -999.990 -999.990 1.402 ..P WKT 2010 09 30 11 09 55 31.3200 -97.3300 251.000 30.0 155.407 2.620 -999.990 -999.990 1.554 ..P WKT 2010 09 30 11 14 55 31.3200 -97.3300 251.000 122.0 115.676 1.810 -999.990 -999.990 1.157 ..P WKT 2010 09 30 11 19 55 31.3200 -97.3300 251.000 457.0 132.274 2.470 -999.990 -999.990 1.323 ..P WKT 2010 09 30 11 29 55 31.3200 -97.3300 251.000 30.0 158.573 2.230 -999.990 -999.990 1.586 ..P WKT 2010 09 30 11 34 55 31.3200 -97.3300 251.000 122.0 115.464 2.060 -999.990 -999.990 1.155 ..P WKT 2010 09 30 11 39 55 31.3200 -97.3300 251.000 457.0 128.133 1.900 -999.990 -999.990 1.281 ..P WKT 2010 09 30 11 44 55 31.3200 -97.3300 251.000 30.0 169.626 3.510 -999.990 -999.990 1.696 ..P WKT 2010 09 30 11 49 55 31.3200 -97.3300 251.000 122.0 122.753 2.440 -999.990 -999.990 1.228 ..P WKT 2010 09 30 12 09 55 31.3200 -97.3300 251.000 457.0 132.631 2.110 -999.990 -999.990 1.326 ..P WKT 2010 09 30 12 10 25 31.3200 -97.3300 251.000 457.0 132.057 2.610 -999.990 -999.990 1.321 ..P WKT 2010 09 30 12 10 55 31.3200 -97.3300 251.000 457.0 128.790 3.400 -999.990 -999.990 1.288 ..P WKT 2010 09 30 12 11 25 31.3200 -97.3300 251.000 457.0 127.678 2.120 -999.990 -999.990 1.277 ..P WKT 2010 09 30 12 11 55 31.3200 -97.3300 251.000 457.0 128.451 1.800 -999.990 -999.990 1.285 ..P WKT 2010 09 30 12 12 25 31.3200 -97.3300 251.000 457.0 130.033 2.050 -999.990 -999.990 1.300 ..P WKT 2010 09 30 12 12 55 31.3200 -97.3300 251.000 457.0 125.957 2.920 -999.990 -999.990 1.260 ..P WKT 2010 09 30 12 13 25 31.3200 -97.3300 251.000 457.0 126.191 3.020 -999.990 -999.990 1.262 ..P WKT 2010 09 30 12 13 55 31.3200 -97.3300 251.000 457.0 131.544 1.880 -999.990 -999.990 1.315 ..P WKT 2010 09 30 12 14 25 31.3200 -97.3300 251.000 457.0 129.624 1.920 -999.990 -999.990 1.296 ..P WKT 2010 09 30 12 14 55 31.3200 -97.3300 251.000 457.0 123.932 2.010 -999.990 -999.990 1.239 ..P WKT 2010 09 30 12 19 55 31.3200 -97.3300 251.000 30.0 181.500 2.360 -999.990 -999.990 1.815 ..P WKT 2010 09 30 12 24 55 31.3200 -97.3300 251.000 122.0 112.593 2.370 -999.990 -999.990 1.126 ..P WKT 2010 09 30 12 29 55 31.3200 -97.3300 251.000 457.0 117.362 2.630 -999.990 -999.990 1.174 ..P WKT 2010 09 30 12 34 55 31.3200 -97.3300 251.000 30.0 174.933 3.070 -999.990 -999.990 1.749 ..P WKT 2010 09 30 12 39 55 31.3200 -97.3300 251.000 122.0 113.431 3.160 -999.990 -999.990 1.134 ..P WKT 2010 09 30 12 44 55 31.3200 -97.3300 251.000 457.0 119.682 3.160 -999.990 -999.990 1.197 ..P WKT 2010 09 30 12 54 55 31.3200 -97.3300 251.000 30.0 183.717 3.670 -999.990 -999.990 1.837 ..P WKT 2010 09 30 12 59 55 31.3200 -97.3300 251.000 122.0 108.547 3.580 -999.990 -999.990 1.085 ..P WKT 2010 09 30 13 04 55 31.3200 -97.3300 251.000 457.0 117.702 3.610 -999.990 -999.990 1.177 ..P WKT 2010 09 30 13 09 55 31.3200 -97.3300 251.000 30.0 190.845 4.430 -999.990 -999.990 1.908 ..P WKT 2010 09 30 13 14 55 31.3200 -97.3300 251.000 122.0 117.019 2.790 -999.990 -999.990 1.170 ..P WKT 2010 09 30 13 19 55 31.3200 -97.3300 251.000 457.0 123.614 2.860 -999.990 -999.990 1.236 ..P WKT 2010 09 30 13 29 55 31.3200 -97.3300 251.000 30.0 211.922 4.150 -999.990 -999.990 2.119 ..P WKT 2010 09 30 13 34 55 31.3200 -97.3300 251.000 122.0 120.925 3.880 -999.990 -999.990 1.209 ..P WKT 2010 09 30 13 39 55 31.3200 -97.3300 251.000 457.0 130.023 2.920 -999.990 -999.990 1.300 ..P WKT 2010 09 30 13 44 55 31.3200 -97.3300 251.000 30.0 204.733 4.560 -999.990 -999.990 2.047 ..P WKT 2010 09 30 13 49 55 31.3200 -97.3300 251.000 122.0 146.065 2.600 -999.990 -999.990 1.461 ..P WKT 2010 09 30 13 54 55 31.3200 -97.3300 251.000 457.0 125.929 2.280 -999.990 -999.990 1.259 ..P WKT 2010 09 30 14 04 55 31.3200 -97.3300 251.000 30.0 197.962 2.830 -999.990 -999.990 1.980 ..P WKT 2010 09 30 14 09 55 31.3200 -97.3300 251.000 122.0 178.980 7.040 -999.990 -999.990 1.790 ..P WKT 2010 09 30 14 14 55 31.3200 -97.3300 251.000 457.0 130.356 2.570 -999.990 -999.990 1.304 ..P WKT 2010 09 30 14 19 55 31.3200 -97.3300 251.000 30.0 202.724 2.750 -999.990 -999.990 2.027 ..P WKT 2010 09 30 14 24 55 31.3200 -97.3300 251.000 122.0 164.878 3.820 -999.990 -999.990 1.649 ..P WKT 2010 09 30 14 29 55 31.3200 -97.3300 251.000 457.0 134.037 2.820 -999.990 -999.990 1.340 ..P WKT 2010 09 30 14 39 55 31.3200 -97.3300 251.000 30.0 189.428 4.060 -999.990 -999.990 1.894 ..P WKT 2010 09 30 14 44 55 31.3200 -97.3300 251.000 122.0 143.610 4.350 -999.990 -999.990 1.436 ..P WKT 2010 09 30 14 49 55 31.3200 -97.3300 251.000 457.0 150.612 3.550 -999.990 -999.990 1.506 ..P WKT 2010 09 30 14 54 55 31.3200 -97.3300 251.000 30.0 188.607 3.370 -999.990 -999.990 1.886 ..P WKT 2010 09 30 14 59 55 31.3200 -97.3300 251.000 122.0 153.837 3.340 -999.990 -999.990 1.538 ..P WKT 2010 09 30 15 04 55 31.3200 -97.3300 251.000 457.0 147.903 3.140 -999.990 -999.990 1.479 ..P WKT 2010 09 30 15 14 55 31.3200 -97.3300 251.000 30.0 162.833 3.450 -999.990 -999.990 1.628 ..P WKT 2010 09 30 15 19 55 31.3200 -97.3300 251.000 122.0 140.035 2.780 -999.990 -999.990 1.400 ..P WKT 2010 09 30 15 24 55 31.3200 -97.3300 251.000 457.0 149.041 2.980 -999.990 -999.990 1.490 ..P WKT 2010 09 30 15 29 55 31.3200 -97.3300 251.000 30.0 165.863 3.170 -999.990 -999.990 1.659 ..P WKT 2010 09 30 15 34 55 31.3200 -97.3300 251.000 122.0 175.946 3.120 -999.990 -999.990 1.759 ..P WKT 2010 09 30 15 39 55 31.3200 -97.3300 251.000 457.0 152.609 3.970 -999.990 -999.990 1.526 ..P WKT 2010 09 30 15 49 55 31.3200 -97.3300 251.000 30.0 161.918 3.950 -999.990 -999.990 1.619 ..P WKT 2010 09 30 15 54 55 31.3200 -97.3300 251.000 122.0 152.248 2.850 -999.990 -999.990 1.522 ..P WKT 2010 09 30 15 59 55 31.3200 -97.3300 251.000 457.0 138.805 3.250 -999.990 -999.990 1.388 ..P WKT 2010 09 30 16 04 55 31.3200 -97.3300 251.000 30.0 160.673 3.260 -999.990 -999.990 1.607 ..P WKT 2010 09 30 16 09 55 31.3200 -97.3300 251.000 122.0 158.281 3.300 -999.990 -999.990 1.583 ..P WKT 2010 09 30 16 14 55 31.3200 -97.3300 251.000 457.0 119.767 3.700 -999.990 -999.990 1.198 ..P WKT 2010 09 30 16 24 55 31.3200 -97.3300 251.000 30.0 153.204 3.470 -999.990 -999.990 1.532 ..P WKT 2010 09 30 16 29 55 31.3200 -97.3300 251.000 122.0 149.002 2.260 -999.990 -999.990 1.490 ..P WKT 2010 09 30 16 34 55 31.3200 -97.3300 251.000 457.0 121.886 3.490 -999.990 -999.990 1.219 ..P WKT 2010 09 30 16 39 55 31.3200 -97.3300 251.000 30.0 140.866 3.210 -999.990 -999.990 1.409 ..P WKT 2010 09 30 16 44 55 31.3200 -97.3300 251.000 122.0 145.291 3.650 -999.990 -999.990 1.453 ..P WKT 2010 09 30 16 49 55 31.3200 -97.3300 251.000 457.0 150.254 4.700 -999.990 -999.990 1.503 ..P WKT 2010 09 30 17 04 55 31.3200 -97.3300 251.000 30.0 135.192 3.250 -999.990 -999.990 1.352 ..P WKT 2010 09 30 17 09 55 31.3200 -97.3300 251.000 122.0 140.546 3.300 -999.990 -999.990 1.405 ..P WKT 2010 09 30 17 14 55 31.3200 -97.3300 251.000 457.0 132.823 4.440 -999.990 -999.990 1.328 ..P WKT 2010 09 30 17 19 55 31.3200 -97.3300 251.000 30.0 134.942 4.290 -999.990 -999.990 1.349 ..P WKT 2010 09 30 17 24 55 31.3200 -97.3300 251.000 122.0 139.756 3.930 -999.990 -999.990 1.398 ..P WKT 2010 09 30 17 29 55 31.3200 -97.3300 251.000 457.0 133.652 3.100 -999.990 -999.990 1.337 ..P WKT 2010 09 30 17 39 55 31.3200 -97.3300 251.000 30.0 125.712 2.910 -999.990 -999.990 1.257 ..P WKT 2010 09 30 17 44 55 31.3200 -97.3300 251.000 122.0 133.989 3.480 -999.990 -999.990 1.340 ..P WKT 2010 09 30 17 49 55 31.3200 -97.3300 251.000 457.0 129.054 3.170 -999.990 -999.990 1.291 ..P WKT 2010 09 30 17 54 55 31.3200 -97.3300 251.000 30.0 144.746 4.540 -999.990 -999.990 1.447 ..P WKT 2010 09 30 17 59 55 31.3200 -97.3300 251.000 122.0 133.070 3.580 -999.990 -999.990 1.331 ..P WKT 2010 09 30 18 04 55 31.3200 -97.3300 251.000 457.0 132.988 4.820 -999.990 -999.990 1.330 ..P WKT 2010 09 30 18 14 55 31.3200 -97.3300 251.000 30.0 138.603 3.490 -999.990 -999.990 1.386 ..P WKT 2010 09 30 18 19 55 31.3200 -97.3300 251.000 122.0 151.581 3.360 -999.990 -999.990 1.516 ..P WKT 2010 09 30 18 24 55 31.3200 -97.3300 251.000 457.0 147.569 3.220 -999.990 -999.990 1.476 ..P WKT 2010 09 30 18 29 55 31.3200 -97.3300 251.000 30.0 148.413 2.730 -999.990 -999.990 1.484 ..P WKT 2010 09 30 18 34 55 31.3200 -97.3300 251.000 122.0 144.671 2.950 -999.990 -999.990 1.447 ..P WKT 2010 09 30 18 39 55 31.3200 -97.3300 251.000 457.0 153.605 3.070 -999.990 -999.990 1.536 ..P WKT 2010 09 30 18 49 55 31.3200 -97.3300 251.000 30.0 147.932 4.270 -999.990 -999.990 1.479 ..P WKT 2010 09 30 18 54 55 31.3200 -97.3300 251.000 122.0 161.644 4.070 -999.990 -999.990 1.616 ..P WKT 2010 09 30 18 59 55 31.3200 -97.3300 251.000 457.0 150.273 2.770 -999.990 -999.990 1.503 ..P WKT 2010 09 30 19 04 55 31.3200 -97.3300 251.000 30.0 155.355 2.930 -999.990 -999.990 1.554 ..P WKT 2010 09 30 19 09 55 31.3200 -97.3300 251.000 122.0 149.918 3.330 -999.990 -999.990 1.499 ..P WKT 2010 09 30 19 14 55 31.3200 -97.3300 251.000 457.0 149.605 3.360 -999.990 -999.990 1.496 ..P WKT 2010 09 30 19 24 55 31.3200 -97.3300 251.000 30.0 149.674 3.490 -999.990 -999.990 1.497 ..P WKT 2010 09 30 19 29 55 31.3200 -97.3300 251.000 122.0 147.626 3.310 -999.990 -999.990 1.476 ..P WKT 2010 09 30 19 34 55 31.3200 -97.3300 251.000 457.0 153.132 3.310 -999.990 -999.990 1.531 ..P WKT 2010 09 30 19 39 55 31.3200 -97.3300 251.000 30.0 143.263 3.180 -999.990 -999.990 1.433 ..P WKT 2010 09 30 19 44 55 31.3200 -97.3300 251.000 122.0 141.756 3.240 -999.990 -999.990 1.418 ..P WKT 2010 09 30 19 49 55 31.3200 -97.3300 251.000 457.0 139.439 2.700 -999.990 -999.990 1.394 ..P WKT 2010 09 30 19 59 55 31.3200 -97.3300 251.000 30.0 139.238 2.600 -999.990 -999.990 1.392 ..P WKT 2010 09 30 20 04 55 31.3200 -97.3300 251.000 122.0 133.530 2.980 -999.990 -999.990 1.335 ..P WKT 2010 09 30 20 09 55 31.3200 -97.3300 251.000 457.0 139.825 3.080 -999.990 -999.990 1.398 ..P WKT 2010 09 30 20 14 55 31.3200 -97.3300 251.000 30.0 136.276 4.880 -999.990 -999.990 1.363 ..P WKT 2010 09 30 20 19 55 31.3200 -97.3300 251.000 122.0 137.446 3.840 -999.990 -999.990 1.374 ..P WKT 2010 09 30 20 24 55 31.3200 -97.3300 251.000 457.0 141.585 2.170 -999.990 -999.990 1.416 ..P WKT 2010 09 30 20 34 55 31.3200 -97.3300 251.000 30.0 139.128 2.380 -999.990 -999.990 1.391 ..P WKT 2010 09 30 20 39 55 31.3200 -97.3300 251.000 122.0 144.403 2.790 -999.990 -999.990 1.444 ..P WKT 2010 09 30 20 44 55 31.3200 -97.3300 251.000 457.0 145.227 3.840 -999.990 -999.990 1.452 ..P WKT 2010 09 30 20 49 55 31.3200 -97.3300 251.000 30.0 145.242 3.140 -999.990 -999.990 1.452 ..P WKT 2010 09 30 20 54 55 31.3200 -97.3300 251.000 122.0 148.629 2.450 -999.990 -999.990 1.486 ..P WKT 2010 09 30 20 59 55 31.3200 -97.3300 251.000 457.0 141.495 2.960 -999.990 -999.990 1.415 ..P WKT 2010 09 30 21 09 55 31.3200 -97.3300 251.000 30.0 150.427 2.910 -999.990 -999.990 1.504 ..P WKT 2010 09 30 21 14 55 31.3200 -97.3300 251.000 122.0 156.782 3.220 -999.990 -999.990 1.568 ..P WKT 2010 09 30 21 19 55 31.3200 -97.3300 251.000 457.0 150.592 2.970 -999.990 -999.990 1.506 ..P WKT 2010 09 30 21 24 55 31.3200 -97.3300 251.000 30.0 153.979 2.830 -999.990 -999.990 1.540 ..P WKT 2010 09 30 21 29 55 31.3200 -97.3300 251.000 122.0 154.129 3.010 -999.990 -999.990 1.541 ..P WKT 2010 09 30 21 34 55 31.3200 -97.3300 251.000 457.0 159.270 3.590 -999.990 -999.990 1.593 ..P WKT 2010 09 30 21 44 55 31.3200 -97.3300 251.000 30.0 164.639 3.800 -999.990 -999.990 1.646 ..P WKT 2010 09 30 21 49 55 31.3200 -97.3300 251.000 122.0 168.373 3.010 -999.990 -999.990 1.684 ..P WKT 2010 09 30 21 54 55 31.3200 -97.3300 251.000 457.0 163.203 3.060 -999.990 -999.990 1.632 ..P WKT 2010 09 30 21 59 55 31.3200 -97.3300 251.000 30.0 169.906 3.070 -999.990 -999.990 1.699 ..P WKT 2010 09 30 22 04 55 31.3200 -97.3300 251.000 122.0 165.277 4.290 -999.990 -999.990 1.653 ..P WKT 2010 09 30 22 09 55 31.3200 -97.3300 251.000 457.0 162.940 2.640 -999.990 -999.990 1.629 ..P WKT 2010 09 30 22 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 09 30 22 24 55 31.3200 -97.3300 251.000 122.0 172.333 3.420 -999.990 -999.990 1.723 ..P WKT 2010 09 30 22 29 55 31.3200 -97.3300 251.000 457.0 172.869 5.250 -999.990 -999.990 1.729 ..P WKT 2010 09 30 22 34 55 31.3200 -97.3300 251.000 30.0 169.356 2.530 -999.990 -999.990 1.694 ..P WKT 2010 09 30 22 39 55 31.3200 -97.3300 251.000 122.0 168.003 2.590 -999.990 -999.990 1.680 ..P WKT 2010 09 30 22 44 55 31.3200 -97.3300 251.000 457.0 170.157 2.460 -999.990 -999.990 1.702 ..P WKT 2010 09 30 22 54 55 31.3200 -97.3300 251.000 30.0 167.759 2.490 -999.990 -999.990 1.678 ..P WKT 2010 09 30 22 59 55 31.3200 -97.3300 251.000 122.0 162.126 2.380 -999.990 -999.990 1.621 ..P WKT 2010 09 30 23 04 55 31.3200 -97.3300 251.000 457.0 158.922 2.610 -999.990 -999.990 1.589 ..P WKT 2010 09 30 23 09 55 31.3200 -97.3300 251.000 30.0 153.558 4.150 -999.990 -999.990 1.536 ..P WKT 2010 09 30 23 14 55 31.3200 -97.3300 251.000 122.0 160.070 3.090 -999.990 -999.990 1.601 ..P WKT 2010 09 30 23 19 55 31.3200 -97.3300 251.000 457.0 159.564 3.970 -999.990 -999.990 1.596 ..P WKT 2010 09 30 23 29 55 31.3200 -97.3300 251.000 30.0 160.302 3.140 -999.990 -999.990 1.603 ..P WKT 2010 09 30 23 34 55 31.3200 -97.3300 251.000 122.0 165.325 3.170 -999.990 -999.990 1.653 ..P WKT 2010 09 30 23 39 55 31.3200 -97.3300 251.000 457.0 150.645 3.960 -999.990 -999.990 1.506 ..P WKT 2010 09 30 23 44 55 31.3200 -97.3300 251.000 30.0 155.667 4.130 -999.990 -999.990 1.557 ..P WKT 2010 09 30 23 49 55 31.3200 -97.3300 251.000 122.0 159.610 4.090 -999.990 -999.990 1.596 ..P