# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-06-02 08:40:10 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO (In Situ) # Arlyn Andrews # tel: (303) 497-6773 # email: Arlyn.Andrews@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "Blackland Research and Extension Center-Texas Agricultural # Experiment Station" without whom these measurements would not # be possible. # # URL: http://www.pinnacletowers.com/ # # Sensors were installed on the KWKT-TV transmitter tower in February # 2001. In May 2006, this site became the first to use our newly # redesigned instrumentation suite. The upgrades were made in # time for the Texas Air Quality Study 2006 . We also carried # out a demonstration study during 2006 where an O3 sensor was # mounted at our highest sampling level (457 m above ground level). # The O3 data showed clear evidence of nighttime transport of # ozone in the nocturnal jet at the top of the planetary boundary # layer. This site periodically samples air that has passed over # the Dallas - Fort Worth and Houston metropolitan areas. At other # times, the site samples relatively clean air from the Gulf of # Mexico. Summertime weather patterns are dominated by a monsoonal # circulation over the Gulf. WKT thus provides a measurement of # the initial CO2 concentration for air passing over the continent # from the south. As air moves northward, the CO2 concentration # is modified by the action of sources (fossil fuel combustion, # plant respiration, biomass burning, cement production) and sinks # (photosynthesis). Partners: Blackland Research and Extension # Center-Texas Agricultural Experiment Station (Onyango Okello). # # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # code yr mo dy hr mn sc lat lon elev(masl) ht(magl) value totunc atmvar measunc scaleunc flag WKT 2010 10 01 00 09 55 31.3200 -97.3300 251.000 457.0 156.163 3.510 -999.990 -999.990 1.562 ..P WKT 2010 10 01 00 10 25 31.3200 -97.3300 251.000 457.0 164.072 4.430 -999.990 -999.990 1.641 ..P WKT 2010 10 01 00 10 55 31.3200 -97.3300 251.000 457.0 161.990 3.970 -999.990 -999.990 1.620 ..P WKT 2010 10 01 00 11 25 31.3200 -97.3300 251.000 457.0 163.282 3.480 -999.990 -999.990 1.633 ..P WKT 2010 10 01 00 11 55 31.3200 -97.3300 251.000 457.0 160.119 3.660 -999.990 -999.990 1.601 ..P WKT 2010 10 01 00 12 25 31.3200 -97.3300 251.000 457.0 158.577 3.420 -999.990 -999.990 1.586 ..P WKT 2010 10 01 00 12 55 31.3200 -97.3300 251.000 457.0 161.625 3.450 -999.990 -999.990 1.616 ..P WKT 2010 10 01 00 13 25 31.3200 -97.3300 251.000 457.0 155.086 3.580 -999.990 -999.990 1.551 ..P WKT 2010 10 01 00 13 55 31.3200 -97.3300 251.000 457.0 158.810 3.420 -999.990 -999.990 1.588 ..P WKT 2010 10 01 00 14 25 31.3200 -97.3300 251.000 457.0 160.912 3.560 -999.990 -999.990 1.609 ..P WKT 2010 10 01 00 14 55 31.3200 -97.3300 251.000 457.0 160.855 3.330 -999.990 -999.990 1.609 ..P WKT 2010 10 01 00 19 55 31.3200 -97.3300 251.000 30.0 157.580 3.940 -999.990 -999.990 1.576 ..P WKT 2010 10 01 00 24 55 31.3200 -97.3300 251.000 122.0 157.005 3.830 -999.990 -999.990 1.570 ..P WKT 2010 10 01 00 29 55 31.3200 -97.3300 251.000 457.0 156.565 3.740 -999.990 -999.990 1.566 ..P WKT 2010 10 01 00 34 55 31.3200 -97.3300 251.000 30.0 150.178 3.060 -999.990 -999.990 1.502 ..P WKT 2010 10 01 00 39 55 31.3200 -97.3300 251.000 122.0 154.333 3.420 -999.990 -999.990 1.543 ..P WKT 2010 10 01 00 44 55 31.3200 -97.3300 251.000 457.0 154.704 4.550 -999.990 -999.990 1.547 ..P WKT 2010 10 01 00 54 55 31.3200 -97.3300 251.000 30.0 151.935 3.820 -999.990 -999.990 1.519 ..P WKT 2010 10 01 00 59 55 31.3200 -97.3300 251.000 122.0 143.652 3.280 -999.990 -999.990 1.437 ..P WKT 2010 10 01 01 04 55 31.3200 -97.3300 251.000 457.0 153.636 3.670 -999.990 -999.990 1.536 ..P WKT 2010 10 01 01 09 55 31.3200 -97.3300 251.000 30.0 149.140 3.840 -999.990 -999.990 1.491 ..P WKT 2010 10 01 01 14 55 31.3200 -97.3300 251.000 122.0 151.006 3.320 -999.990 -999.990 1.510 ..P WKT 2010 10 01 01 19 55 31.3200 -97.3300 251.000 457.0 145.967 3.340 -999.990 -999.990 1.460 ..P WKT 2010 10 01 01 29 55 31.3200 -97.3300 251.000 30.0 148.015 3.200 -999.990 -999.990 1.480 ..P WKT 2010 10 01 01 34 55 31.3200 -97.3300 251.000 122.0 148.198 4.120 -999.990 -999.990 1.482 ..P WKT 2010 10 01 01 39 55 31.3200 -97.3300 251.000 457.0 151.633 4.440 -999.990 -999.990 1.516 ..P WKT 2010 10 01 01 44 55 31.3200 -97.3300 251.000 30.0 148.835 3.500 -999.990 -999.990 1.488 ..P WKT 2010 10 01 01 49 55 31.3200 -97.3300 251.000 122.0 147.662 3.590 -999.990 -999.990 1.477 ..P WKT 2010 10 01 01 54 55 31.3200 -97.3300 251.000 457.0 152.457 3.470 -999.990 -999.990 1.525 ..P WKT 2010 10 01 02 04 55 31.3200 -97.3300 251.000 30.0 144.761 3.420 -999.990 -999.990 1.448 ..P WKT 2010 10 01 02 09 55 31.3200 -97.3300 251.000 122.0 138.101 3.860 -999.990 -999.990 1.381 ..P WKT 2010 10 01 02 14 55 31.3200 -97.3300 251.000 457.0 148.268 3.410 -999.990 -999.990 1.483 ..P WKT 2010 10 01 02 19 55 31.3200 -97.3300 251.000 30.0 145.678 3.640 -999.990 -999.990 1.457 ..P WKT 2010 10 01 02 24 55 31.3200 -97.3300 251.000 122.0 134.940 4.330 -999.990 -999.990 1.349 ..P WKT 2010 10 01 02 29 55 31.3200 -97.3300 251.000 457.0 150.545 3.400 -999.990 -999.990 1.505 ..P WKT 2010 10 01 02 39 55 31.3200 -97.3300 251.000 30.0 150.330 4.290 -999.990 -999.990 1.503 ..P WKT 2010 10 01 02 44 55 31.3200 -97.3300 251.000 122.0 141.836 4.170 -999.990 -999.990 1.418 ..P WKT 2010 10 01 02 49 55 31.3200 -97.3300 251.000 457.0 145.572 3.900 -999.990 -999.990 1.456 ..P WKT 2010 10 01 02 54 55 31.3200 -97.3300 251.000 30.0 148.493 3.910 -999.990 -999.990 1.485 ..P WKT 2010 10 01 02 59 55 31.3200 -97.3300 251.000 122.0 151.688 3.220 -999.990 -999.990 1.517 ..P WKT 2010 10 01 03 04 55 31.3200 -97.3300 251.000 457.0 148.628 3.290 -999.990 -999.990 1.486 ..P WKT 2010 10 01 03 14 55 31.3200 -97.3300 251.000 30.0 152.144 3.130 -999.990 -999.990 1.521 ..P WKT 2010 10 01 03 19 55 31.3200 -97.3300 251.000 122.0 148.382 3.030 -999.990 -999.990 1.484 ..P WKT 2010 10 01 03 24 55 31.3200 -97.3300 251.000 457.0 153.603 4.030 -999.990 -999.990 1.536 ..P WKT 2010 10 01 03 29 55 31.3200 -97.3300 251.000 30.0 157.736 3.450 -999.990 -999.990 1.577 ..P WKT 2010 10 01 03 34 55 31.3200 -97.3300 251.000 122.0 145.529 3.370 -999.990 -999.990 1.455 ..P WKT 2010 10 01 03 39 55 31.3200 -97.3300 251.000 457.0 151.025 3.900 -999.990 -999.990 1.510 ..P WKT 2010 10 01 03 49 55 31.3200 -97.3300 251.000 30.0 148.202 2.920 -999.990 -999.990 1.482 ..P WKT 2010 10 01 03 54 55 31.3200 -97.3300 251.000 122.0 157.868 2.990 -999.990 -999.990 1.579 ..P WKT 2010 10 01 03 59 55 31.3200 -97.3300 251.000 457.0 157.451 3.070 -999.990 -999.990 1.575 ..P WKT 2010 10 01 04 04 55 31.3200 -97.3300 251.000 30.0 136.987 3.740 -999.990 -999.990 1.370 ..P WKT 2010 10 01 04 09 55 31.3200 -97.3300 251.000 122.0 157.160 3.630 -999.990 -999.990 1.572 ..P WKT 2010 10 01 04 14 55 31.3200 -97.3300 251.000 457.0 148.148 3.310 -999.990 -999.990 1.481 ..P WKT 2010 10 01 04 24 55 31.3200 -97.3300 251.000 30.0 137.111 3.400 -999.990 -999.990 1.371 ..P WKT 2010 10 01 04 29 55 31.3200 -97.3300 251.000 122.0 149.832 4.260 -999.990 -999.990 1.498 ..P WKT 2010 10 01 04 34 55 31.3200 -97.3300 251.000 457.0 152.728 4.220 -999.990 -999.990 1.527 ..P WKT 2010 10 01 04 39 55 31.3200 -97.3300 251.000 30.0 144.836 4.770 -999.990 -999.990 1.448 ..P WKT 2010 10 01 04 44 55 31.3200 -97.3300 251.000 122.0 152.377 3.990 -999.990 -999.990 1.524 ..P WKT 2010 10 01 04 49 55 31.3200 -97.3300 251.000 457.0 162.243 3.790 -999.990 -999.990 1.622 ..P WKT 2010 10 01 05 04 55 31.3200 -97.3300 251.000 30.0 139.091 3.690 -999.990 -999.990 1.391 ..P WKT 2010 10 01 05 09 55 31.3200 -97.3300 251.000 122.0 158.737 3.910 -999.990 -999.990 1.587 ..P WKT 2010 10 01 05 14 55 31.3200 -97.3300 251.000 457.0 153.499 6.770 -999.990 -999.990 1.535 ..P WKT 2010 10 01 05 19 55 31.3200 -97.3300 251.000 30.0 138.547 4.710 -999.990 -999.990 1.385 ..P WKT 2010 10 01 05 24 55 31.3200 -97.3300 251.000 122.0 173.256 4.430 -999.990 -999.990 1.733 ..P WKT 2010 10 01 05 29 55 31.3200 -97.3300 251.000 457.0 151.460 6.870 -999.990 -999.990 1.515 ..P WKT 2010 10 01 05 39 55 31.3200 -97.3300 251.000 30.0 146.401 4.300 -999.990 -999.990 1.464 ..P WKT 2010 10 01 05 44 55 31.3200 -97.3300 251.000 122.0 167.400 4.220 -999.990 -999.990 1.674 ..P WKT 2010 10 01 05 49 55 31.3200 -97.3300 251.000 457.0 136.908 4.870 -999.990 -999.990 1.369 ..P WKT 2010 10 01 05 54 55 31.3200 -97.3300 251.000 30.0 157.367 4.060 -999.990 -999.990 1.574 ..P WKT 2010 10 01 05 59 55 31.3200 -97.3300 251.000 122.0 164.130 4.070 -999.990 -999.990 1.641 ..P WKT 2010 10 01 06 04 55 31.3200 -97.3300 251.000 457.0 135.126 4.610 -999.990 -999.990 1.351 ..P WKT 2010 10 01 06 14 55 31.3200 -97.3300 251.000 30.0 157.546 4.390 -999.990 -999.990 1.575 ..P WKT 2010 10 01 06 19 55 31.3200 -97.3300 251.000 122.0 170.605 5.370 -999.990 -999.990 1.706 ..P WKT 2010 10 01 06 24 55 31.3200 -97.3300 251.000 457.0 121.669 4.630 -999.990 -999.990 1.217 ..P WKT 2010 10 01 06 29 55 31.3200 -97.3300 251.000 30.0 158.049 4.470 -999.990 -999.990 1.580 ..P WKT 2010 10 01 06 34 55 31.3200 -97.3300 251.000 122.0 166.176 4.300 -999.990 -999.990 1.662 ..P WKT 2010 10 01 06 39 55 31.3200 -97.3300 251.000 457.0 115.286 4.750 -999.990 -999.990 1.153 ..P WKT 2010 10 01 06 49 55 31.3200 -97.3300 251.000 30.0 163.272 4.760 -999.990 -999.990 1.633 ..P WKT 2010 10 01 06 54 55 31.3200 -97.3300 251.000 122.0 157.005 4.330 -999.990 -999.990 1.570 ..P WKT 2010 10 01 06 59 55 31.3200 -97.3300 251.000 457.0 116.667 5.750 -999.990 -999.990 1.167 ..P WKT 2010 10 01 07 04 55 31.3200 -97.3300 251.000 30.0 169.746 5.170 -999.990 -999.990 1.697 ..P WKT 2010 10 01 07 09 55 31.3200 -97.3300 251.000 122.0 157.430 4.650 -999.990 -999.990 1.574 ..P WKT 2010 10 01 07 14 55 31.3200 -97.3300 251.000 457.0 117.616 4.710 -999.990 -999.990 1.176 ..P WKT 2010 10 01 07 24 55 31.3200 -97.3300 251.000 30.0 173.925 4.440 -999.990 -999.990 1.739 ..P WKT 2010 10 01 07 29 55 31.3200 -97.3300 251.000 122.0 153.189 4.750 -999.990 -999.990 1.532 ..P WKT 2010 10 01 07 34 55 31.3200 -97.3300 251.000 457.0 111.809 5.450 -999.990 -999.990 1.118 ..P WKT 2010 10 01 07 39 55 31.3200 -97.3300 251.000 30.0 167.009 5.340 -999.990 -999.990 1.670 ..P WKT 2010 10 01 07 44 55 31.3200 -97.3300 251.000 122.0 138.552 5.530 -999.990 -999.990 1.386 ..P WKT 2010 10 01 07 49 55 31.3200 -97.3300 251.000 457.0 106.503 5.710 -999.990 -999.990 1.065 ..P WKT 2010 10 01 07 59 55 31.3200 -97.3300 251.000 30.0 157.008 7.350 -999.990 -999.990 1.570 ..P WKT 2010 10 01 08 04 55 31.3200 -97.3300 251.000 122.0 134.506 5.550 -999.990 -999.990 1.345 ..P WKT 2010 10 01 08 09 55 31.3200 -97.3300 251.000 457.0 104.555 5.840 -999.990 -999.990 1.046 ..P WKT 2010 10 01 08 14 55 31.3200 -97.3300 251.000 30.0 162.237 5.870 -999.990 -999.990 1.622 ..P WKT 2010 10 01 08 19 55 31.3200 -97.3300 251.000 122.0 141.928 5.580 -999.990 -999.990 1.419 ..P WKT 2010 10 01 08 24 55 31.3200 -97.3300 251.000 457.0 111.270 4.900 -999.990 -999.990 1.113 ..P WKT 2010 10 01 08 34 55 31.3200 -97.3300 251.000 30.0 160.629 4.910 -999.990 -999.990 1.606 ..P WKT 2010 10 01 08 39 55 31.3200 -97.3300 251.000 122.0 134.331 4.930 -999.990 -999.990 1.343 ..P WKT 2010 10 01 08 44 55 31.3200 -97.3300 251.000 457.0 112.576 5.500 -999.990 -999.990 1.126 ..P WKT 2010 10 01 08 49 55 31.3200 -97.3300 251.000 30.0 163.129 5.210 -999.990 -999.990 1.631 ..P WKT 2010 10 01 08 54 55 31.3200 -97.3300 251.000 122.0 140.127 5.960 -999.990 -999.990 1.401 ..P WKT 2010 10 01 08 59 55 31.3200 -97.3300 251.000 457.0 113.664 5.620 -999.990 -999.990 1.137 ..P WKT 2010 10 01 09 09 55 31.3200 -97.3300 251.000 30.0 153.369 5.460 -999.990 -999.990 1.534 ..P WKT 2010 10 01 09 14 55 31.3200 -97.3300 251.000 122.0 128.531 5.410 -999.990 -999.990 1.285 ..P WKT 2010 10 01 09 19 55 31.3200 -97.3300 251.000 457.0 115.428 4.710 -999.990 -999.990 1.154 ..P WKT 2010 10 01 09 24 55 31.3200 -97.3300 251.000 30.0 150.003 4.640 -999.990 -999.990 1.500 ..P WKT 2010 10 01 09 29 55 31.3200 -97.3300 251.000 122.0 122.522 5.560 -999.990 -999.990 1.225 ..P WKT 2010 10 01 09 34 55 31.3200 -97.3300 251.000 457.0 127.800 4.720 -999.990 -999.990 1.278 ..P WKT 2010 10 01 09 44 55 31.3200 -97.3300 251.000 30.0 143.124 4.670 -999.990 -999.990 1.431 ..P WKT 2010 10 01 09 49 55 31.3200 -97.3300 251.000 122.0 125.778 4.920 -999.990 -999.990 1.258 ..P WKT 2010 10 01 09 54 55 31.3200 -97.3300 251.000 457.0 126.553 5.000 -999.990 -999.990 1.266 ..P WKT 2010 10 01 09 59 55 31.3200 -97.3300 251.000 30.0 141.032 4.930 -999.990 -999.990 1.410 ..P WKT 2010 10 01 10 04 55 31.3200 -97.3300 251.000 122.0 128.105 5.100 -999.990 -999.990 1.281 ..P WKT 2010 10 01 10 09 55 31.3200 -97.3300 251.000 457.0 129.019 5.030 -999.990 -999.990 1.290 ..P WKT 2010 10 01 10 19 55 31.3200 -97.3300 251.000 30.0 147.672 5.930 -999.990 -999.990 1.477 ..P WKT 2010 10 01 10 24 55 31.3200 -97.3300 251.000 122.0 132.716 4.920 -999.990 -999.990 1.327 ..P WKT 2010 10 01 10 29 55 31.3200 -97.3300 251.000 457.0 116.367 6.220 -999.990 -999.990 1.164 ..P WKT 2010 10 01 10 34 55 31.3200 -97.3300 251.000 30.0 144.372 4.990 -999.990 -999.990 1.444 ..P WKT 2010 10 01 10 39 55 31.3200 -97.3300 251.000 122.0 141.052 4.730 -999.990 -999.990 1.411 ..P WKT 2010 10 01 10 44 55 31.3200 -97.3300 251.000 457.0 126.637 4.640 -999.990 -999.990 1.266 ..P WKT 2010 10 01 10 54 55 31.3200 -97.3300 251.000 30.0 151.579 6.120 -999.990 -999.990 1.516 ..P WKT 2010 10 01 10 59 55 31.3200 -97.3300 251.000 122.0 130.178 5.070 -999.990 -999.990 1.302 ..P WKT 2010 10 01 11 04 55 31.3200 -97.3300 251.000 457.0 124.037 4.630 -999.990 -999.990 1.240 ..P WKT 2010 10 01 11 09 55 31.3200 -97.3300 251.000 30.0 138.716 4.720 -999.990 -999.990 1.387 ..P WKT 2010 10 01 11 14 55 31.3200 -97.3300 251.000 122.0 123.410 4.780 -999.990 -999.990 1.234 ..P WKT 2010 10 01 11 19 55 31.3200 -97.3300 251.000 457.0 120.596 6.610 -999.990 -999.990 1.206 ..P WKT 2010 10 01 11 29 55 31.3200 -97.3300 251.000 30.0 131.435 4.660 -999.990 -999.990 1.314 ..P WKT 2010 10 01 11 34 55 31.3200 -97.3300 251.000 122.0 127.028 4.900 -999.990 -999.990 1.270 ..P WKT 2010 10 01 11 39 55 31.3200 -97.3300 251.000 457.0 117.059 5.320 -999.990 -999.990 1.171 ..P WKT 2010 10 01 11 44 55 31.3200 -97.3300 251.000 30.0 134.336 5.260 -999.990 -999.990 1.343 ..P WKT 2010 10 01 11 49 55 31.3200 -97.3300 251.000 122.0 127.703 5.360 -999.990 -999.990 1.277 ..P WKT 2010 10 01 12 09 55 31.3200 -97.3300 251.000 457.0 118.151 5.330 -999.990 -999.990 1.182 ..P WKT 2010 10 01 12 10 25 31.3200 -97.3300 251.000 457.0 124.829 5.300 -999.990 -999.990 1.248 ..P WKT 2010 10 01 12 10 55 31.3200 -97.3300 251.000 457.0 121.355 5.510 -999.990 -999.990 1.214 ..P WKT 2010 10 01 12 11 25 31.3200 -97.3300 251.000 457.0 121.914 5.540 -999.990 -999.990 1.219 ..P WKT 2010 10 01 12 11 55 31.3200 -97.3300 251.000 457.0 117.050 6.100 -999.990 -999.990 1.171 ..P WKT 2010 10 01 12 12 25 31.3200 -97.3300 251.000 457.0 122.476 5.090 -999.990 -999.990 1.225 ..P WKT 2010 10 01 12 12 55 31.3200 -97.3300 251.000 457.0 123.035 5.460 -999.990 -999.990 1.230 ..P WKT 2010 10 01 12 13 25 31.3200 -97.3300 251.000 457.0 116.224 5.480 -999.990 -999.990 1.162 ..P WKT 2010 10 01 12 13 55 31.3200 -97.3300 251.000 457.0 115.393 5.330 -999.990 -999.990 1.154 ..P WKT 2010 10 01 12 14 25 31.3200 -97.3300 251.000 457.0 120.957 5.250 -999.990 -999.990 1.210 ..P WKT 2010 10 01 12 14 55 31.3200 -97.3300 251.000 457.0 119.848 5.360 -999.990 -999.990 1.198 ..P WKT 2010 10 01 12 19 55 31.3200 -97.3300 251.000 30.0 131.555 6.070 -999.990 -999.990 1.316 ..P WKT 2010 10 01 12 24 55 31.3200 -97.3300 251.000 122.0 123.796 5.730 -999.990 -999.990 1.238 ..P WKT 2010 10 01 12 29 55 31.3200 -97.3300 251.000 457.0 117.429 5.080 -999.990 -999.990 1.174 ..P WKT 2010 10 01 12 34 55 31.3200 -97.3300 251.000 30.0 127.047 5.120 -999.990 -999.990 1.270 ..P WKT 2010 10 01 12 39 55 31.3200 -97.3300 251.000 122.0 127.074 4.840 -999.990 -999.990 1.271 ..P WKT 2010 10 01 12 44 55 31.3200 -97.3300 251.000 457.0 120.848 5.020 -999.990 -999.990 1.208 ..P WKT 2010 10 01 12 54 55 31.3200 -97.3300 251.000 30.0 134.282 4.880 -999.990 -999.990 1.343 ..P WKT 2010 10 01 12 59 55 31.3200 -97.3300 251.000 122.0 121.296 4.760 -999.990 -999.990 1.213 ..P WKT 2010 10 01 13 04 55 31.3200 -97.3300 251.000 457.0 114.702 4.990 -999.990 -999.990 1.147 ..P WKT 2010 10 01 13 09 55 31.3200 -97.3300 251.000 30.0 130.882 4.840 -999.990 -999.990 1.309 ..P WKT 2010 10 01 13 14 55 31.3200 -97.3300 251.000 122.0 123.872 4.910 -999.990 -999.990 1.239 ..P WKT 2010 10 01 13 19 55 31.3200 -97.3300 251.000 457.0 127.829 4.890 -999.990 -999.990 1.278 ..P WKT 2010 10 01 13 29 55 31.3200 -97.3300 251.000 30.0 128.388 4.980 -999.990 -999.990 1.284 ..P WKT 2010 10 01 13 34 55 31.3200 -97.3300 251.000 122.0 128.597 5.580 -999.990 -999.990 1.286 ..P WKT 2010 10 01 13 39 55 31.3200 -97.3300 251.000 457.0 123.811 5.270 -999.990 -999.990 1.238 ..P WKT 2010 10 01 13 44 55 31.3200 -97.3300 251.000 30.0 130.264 4.950 -999.990 -999.990 1.303 ..P WKT 2010 10 01 13 49 55 31.3200 -97.3300 251.000 122.0 129.641 4.950 -999.990 -999.990 1.296 ..P WKT 2010 10 01 13 54 55 31.3200 -97.3300 251.000 457.0 129.018 4.900 -999.990 -999.990 1.290 ..P WKT 2010 10 01 14 04 55 31.3200 -97.3300 251.000 30.0 127.098 4.790 -999.990 -999.990 1.271 ..P WKT 2010 10 01 14 09 55 31.3200 -97.3300 251.000 122.0 137.171 4.940 -999.990 -999.990 1.372 ..P WKT 2010 10 01 14 14 55 31.3200 -97.3300 251.000 457.0 126.171 4.650 -999.990 -999.990 1.262 ..P WKT 2010 10 01 14 19 55 31.3200 -97.3300 251.000 30.0 134.300 5.260 -999.990 -999.990 1.343 ..P WKT 2010 10 01 14 24 55 31.3200 -97.3300 251.000 122.0 145.753 4.680 -999.990 -999.990 1.458 ..P WKT 2010 10 01 14 29 55 31.3200 -97.3300 251.000 457.0 133.648 4.730 -999.990 -999.990 1.336 ..P WKT 2010 10 01 14 39 55 31.3200 -97.3300 251.000 30.0 145.542 4.440 -999.990 -999.990 1.455 ..P WKT 2010 10 01 14 44 55 31.3200 -97.3300 251.000 122.0 150.141 4.580 -999.990 -999.990 1.501 ..P WKT 2010 10 01 14 49 55 31.3200 -97.3300 251.000 457.0 136.459 5.070 -999.990 -999.990 1.365 ..P WKT 2010 10 01 14 54 55 31.3200 -97.3300 251.000 30.0 154.628 4.620 -999.990 -999.990 1.546 ..P WKT 2010 10 01 14 59 55 31.3200 -97.3300 251.000 122.0 150.641 4.750 -999.990 -999.990 1.506 ..P WKT 2010 10 01 15 04 55 31.3200 -97.3300 251.000 457.0 136.964 5.890 -999.990 -999.990 1.370 ..P WKT 2010 10 01 15 14 55 31.3200 -97.3300 251.000 30.0 141.926 4.340 -999.990 -999.990 1.419 ..P WKT 2010 10 01 15 19 55 31.3200 -97.3300 251.000 122.0 146.443 4.780 -999.990 -999.990 1.464 ..P WKT 2010 10 01 15 24 55 31.3200 -97.3300 251.000 457.0 177.799 4.280 -999.990 -999.990 1.778 ..P WKT 2010 10 01 15 29 55 31.3200 -97.3300 251.000 30.0 146.342 3.900 -999.990 -999.990 1.463 ..P WKT 2010 10 01 15 34 55 31.3200 -97.3300 251.000 122.0 143.387 4.650 -999.990 -999.990 1.434 ..P WKT 2010 10 01 15 39 55 31.3200 -97.3300 251.000 457.0 159.794 4.770 -999.990 -999.990 1.598 ..P WKT 2010 10 01 15 49 55 31.3200 -97.3300 251.000 30.0 140.215 3.990 -999.990 -999.990 1.402 ..P WKT 2010 10 01 15 54 55 31.3200 -97.3300 251.000 122.0 142.120 4.080 -999.990 -999.990 1.421 ..P WKT 2010 10 01 15 59 55 31.3200 -97.3300 251.000 457.0 161.026 6.990 -999.990 -999.990 1.610 ..P WKT 2010 10 01 16 04 55 31.3200 -97.3300 251.000 30.0 139.019 4.490 -999.990 -999.990 1.390 ..P WKT 2010 10 01 16 09 55 31.3200 -97.3300 251.000 122.0 142.997 4.300 -999.990 -999.990 1.430 ..P WKT 2010 10 01 16 14 55 31.3200 -97.3300 251.000 457.0 150.980 3.790 -999.990 -999.990 1.510 ..P WKT 2010 10 01 16 24 55 31.3200 -97.3300 251.000 30.0 141.031 3.800 -999.990 -999.990 1.410 ..P WKT 2010 10 01 16 29 55 31.3200 -97.3300 251.000 122.0 141.199 4.530 -999.990 -999.990 1.412 ..P WKT 2010 10 01 16 34 55 31.3200 -97.3300 251.000 457.0 144.818 4.690 -999.990 -999.990 1.448 ..P WKT 2010 10 01 16 39 55 31.3200 -97.3300 251.000 30.0 141.533 4.420 -999.990 -999.990 1.415 ..P WKT 2010 10 01 16 44 55 31.3200 -97.3300 251.000 122.0 140.596 4.820 -999.990 -999.990 1.406 ..P WKT 2010 10 01 16 49 55 31.3200 -97.3300 251.000 457.0 141.454 4.140 -999.990 -999.990 1.415 ..P WKT 2010 10 01 17 04 55 31.3200 -97.3300 251.000 30.0 132.222 3.390 -999.990 -999.990 1.322 ..P WKT 2010 10 01 17 09 55 31.3200 -97.3300 251.000 122.0 134.561 3.630 -999.990 -999.990 1.346 ..P WKT 2010 10 01 17 14 55 31.3200 -97.3300 251.000 457.0 139.106 4.270 -999.990 -999.990 1.391 ..P WKT 2010 10 01 17 19 55 31.3200 -97.3300 251.000 30.0 139.237 4.420 -999.990 -999.990 1.392 ..P WKT 2010 10 01 17 24 55 31.3200 -97.3300 251.000 122.0 138.402 4.170 -999.990 -999.990 1.384 ..P WKT 2010 10 01 17 29 55 31.3200 -97.3300 251.000 457.0 135.361 3.620 -999.990 -999.990 1.354 ..P WKT 2010 10 01 17 39 55 31.3200 -97.3300 251.000 30.0 127.290 3.650 -999.990 -999.990 1.273 ..P WKT 2010 10 01 17 44 55 31.3200 -97.3300 251.000 122.0 141.419 3.880 -999.990 -999.990 1.414 ..P WKT 2010 10 01 17 49 55 31.3200 -97.3300 251.000 457.0 137.766 4.150 -999.990 -999.990 1.378 ..P WKT 2010 10 01 17 54 55 31.3200 -97.3300 251.000 30.0 137.147 4.320 -999.990 -999.990 1.371 ..P WKT 2010 10 01 17 59 55 31.3200 -97.3300 251.000 122.0 137.353 4.200 -999.990 -999.990 1.374 ..P WKT 2010 10 01 18 04 55 31.3200 -97.3300 251.000 457.0 131.223 4.620 -999.990 -999.990 1.312 ..P WKT 2010 10 01 18 14 55 31.3200 -97.3300 251.000 30.0 143.875 3.440 -999.990 -999.990 1.439 ..P WKT 2010 10 01 18 19 55 31.3200 -97.3300 251.000 122.0 138.416 4.850 -999.990 -999.990 1.384 ..P WKT 2010 10 01 18 24 55 31.3200 -97.3300 251.000 457.0 133.508 6.430 -999.990 -999.990 1.335 ..P WKT 2010 10 01 18 29 55 31.3200 -97.3300 251.000 30.0 142.645 4.090 -999.990 -999.990 1.426 ..P WKT 2010 10 01 18 34 55 31.3200 -97.3300 251.000 122.0 145.996 3.190 -999.990 -999.990 1.460 ..P WKT 2010 10 01 18 39 55 31.3200 -97.3300 251.000 457.0 142.191 3.610 -999.990 -999.990 1.422 ..P WKT 2010 10 01 18 49 55 31.3200 -97.3300 251.000 30.0 134.465 3.370 -999.990 -999.990 1.345 ..P WKT 2010 10 01 18 54 55 31.3200 -97.3300 251.000 122.0 136.323 3.860 -999.990 -999.990 1.363 ..P WKT 2010 10 01 18 59 55 31.3200 -97.3300 251.000 457.0 140.381 5.600 -999.990 -999.990 1.404 ..P WKT 2010 10 01 19 04 55 31.3200 -97.3300 251.000 30.0 128.484 7.270 -999.990 -999.990 1.285 ..P WKT 2010 10 01 19 09 55 31.3200 -97.3300 251.000 122.0 135.293 6.120 -999.990 -999.990 1.353 ..P WKT 2010 10 01 19 14 55 31.3200 -97.3300 251.000 457.0 131.924 5.540 -999.990 -999.990 1.319 ..P WKT 2010 10 01 19 24 55 31.3200 -97.3300 251.000 30.0 127.095 4.110 -999.990 -999.990 1.271 ..P WKT 2010 10 01 19 29 55 31.3200 -97.3300 251.000 122.0 127.283 6.210 -999.990 -999.990 1.273 ..P WKT 2010 10 01 19 34 55 31.3200 -97.3300 251.000 457.0 128.021 7.130 -999.990 -999.990 1.280 ..P WKT 2010 10 01 19 39 55 31.3200 -97.3300 251.000 30.0 139.201 7.940 -999.990 -999.990 1.392 ..P WKT 2010 10 01 19 44 55 31.3200 -97.3300 251.000 122.0 125.374 6.400 -999.990 -999.990 1.254 ..P WKT 2010 10 01 19 49 55 31.3200 -97.3300 251.000 457.0 123.227 4.060 -999.990 -999.990 1.232 ..P WKT 2010 10 01 19 59 55 31.3200 -97.3300 251.000 30.0 121.427 5.460 -999.990 -999.990 1.214 ..P WKT 2010 10 01 20 04 55 31.3200 -97.3300 251.000 122.0 132.208 5.990 -999.990 -999.990 1.322 ..P WKT 2010 10 01 20 09 55 31.3200 -97.3300 251.000 457.0 123.628 7.230 -999.990 -999.990 1.236 ..P WKT 2010 10 01 20 14 55 31.3200 -97.3300 251.000 30.0 129.052 5.540 -999.990 -999.990 1.291 ..P WKT 2010 10 01 20 19 55 31.3200 -97.3300 251.000 122.0 118.142 3.300 -999.990 -999.990 1.181 ..P WKT 2010 10 01 20 24 55 31.3200 -97.3300 251.000 457.0 118.350 3.270 -999.990 -999.990 1.183 ..P WKT 2010 10 01 20 34 55 31.3200 -97.3300 251.000 30.0 122.492 4.580 -999.990 -999.990 1.225 ..P WKT 2010 10 01 20 39 55 31.3200 -97.3300 251.000 122.0 121.484 5.400 -999.990 -999.990 1.215 ..P WKT 2010 10 01 20 44 55 31.3200 -97.3300 251.000 457.0 114.855 2.820 -999.990 -999.990 1.149 ..P WKT 2010 10 01 20 49 55 31.3200 -97.3300 251.000 30.0 110.969 2.810 -999.990 -999.990 1.110 ..P WKT 2010 10 01 20 54 55 31.3200 -97.3300 251.000 122.0 115.448 3.970 -999.990 -999.990 1.154 ..P WKT 2010 10 01 20 59 55 31.3200 -97.3300 251.000 457.0 114.443 2.680 -999.990 -999.990 1.144 ..P WKT 2010 10 01 21 09 55 31.3200 -97.3300 251.000 30.0 115.898 2.560 -999.990 -999.990 1.159 ..P WKT 2010 10 01 21 14 55 31.3200 -97.3300 251.000 122.0 123.156 3.790 -999.990 -999.990 1.232 ..P WKT 2010 10 01 21 19 55 31.3200 -97.3300 251.000 457.0 120.682 2.800 -999.990 -999.990 1.207 ..P WKT 2010 10 01 21 24 55 31.3200 -97.3300 251.000 30.0 111.632 2.840 -999.990 -999.990 1.116 ..P WKT 2010 10 01 21 29 55 31.3200 -97.3300 251.000 122.0 120.119 3.900 -999.990 -999.990 1.201 ..P WKT 2010 10 01 21 34 55 31.3200 -97.3300 251.000 457.0 112.716 2.230 -999.990 -999.990 1.127 ..P WKT 2010 10 01 21 44 55 31.3200 -97.3300 251.000 30.0 117.378 3.820 -999.990 -999.990 1.174 ..P WKT 2010 10 01 21 49 55 31.3200 -97.3300 251.000 122.0 120.129 3.800 -999.990 -999.990 1.201 ..P WKT 2010 10 01 21 54 55 31.3200 -97.3300 251.000 457.0 121.511 3.460 -999.990 -999.990 1.215 ..P WKT 2010 10 01 21 59 55 31.3200 -97.3300 251.000 30.0 119.880 3.530 -999.990 -999.990 1.199 ..P WKT 2010 10 01 22 04 55 31.3200 -97.3300 251.000 122.0 123.998 2.670 -999.990 -999.990 1.240 ..P WKT 2010 10 01 22 09 55 31.3200 -97.3300 251.000 457.0 122.915 2.320 -999.990 -999.990 1.229 ..P WKT 2010 10 01 22 19 55 31.3200 -97.3300 251.000 30.0 120.555 3.870 -999.990 -999.990 1.206 ..P WKT 2010 10 01 22 24 55 31.3200 -97.3300 251.000 122.0 125.569 2.530 -999.990 -999.990 1.256 ..P WKT 2010 10 01 22 29 55 31.3200 -97.3300 251.000 457.0 121.556 2.390 -999.990 -999.990 1.216 ..P WKT 2010 10 01 22 34 55 31.3200 -97.3300 251.000 30.0 114.810 2.170 -999.990 -999.990 1.148 ..P WKT 2010 10 01 22 39 55 31.3200 -97.3300 251.000 122.0 121.737 4.040 -999.990 -999.990 1.217 ..P WKT 2010 10 01 22 44 55 31.3200 -97.3300 251.000 457.0 116.633 2.890 -999.990 -999.990 1.166 ..P WKT 2010 10 01 22 54 55 31.3200 -97.3300 251.000 30.0 118.767 2.560 -999.990 -999.990 1.188 ..P WKT 2010 10 01 22 59 55 31.3200 -97.3300 251.000 122.0 120.809 2.600 -999.990 -999.990 1.208 ..P WKT 2010 10 01 23 04 55 31.3200 -97.3300 251.000 457.0 126.677 2.490 -999.990 -999.990 1.267 ..P WKT 2010 10 01 23 09 55 31.3200 -97.3300 251.000 30.0 118.062 2.850 -999.990 -999.990 1.181 ..P WKT 2010 10 01 23 14 55 31.3200 -97.3300 251.000 122.0 121.197 2.020 -999.990 -999.990 1.212 ..P WKT 2010 10 01 23 19 55 31.3200 -97.3300 251.000 457.0 120.507 3.730 -999.990 -999.990 1.205 ..P WKT 2010 10 01 23 29 55 31.3200 -97.3300 251.000 30.0 121.605 3.730 -999.990 -999.990 1.216 ..P WKT 2010 10 01 23 34 55 31.3200 -97.3300 251.000 122.0 124.210 2.260 -999.990 -999.990 1.242 ..P WKT 2010 10 01 23 39 55 31.3200 -97.3300 251.000 457.0 122.448 3.360 -999.990 -999.990 1.224 ..P WKT 2010 10 01 23 44 55 31.3200 -97.3300 251.000 30.0 121.368 2.830 -999.990 -999.990 1.214 ..P WKT 2010 10 01 23 49 55 31.3200 -97.3300 251.000 122.0 120.698 5.730 -999.990 -999.990 1.207 ..P WKT 2010 10 02 00 09 55 31.3200 -97.3300 251.000 457.0 129.221 4.150 -999.990 -999.990 1.292 ..P WKT 2010 10 02 00 10 25 31.3200 -97.3300 251.000 457.0 127.619 3.390 -999.990 -999.990 1.276 ..P WKT 2010 10 02 00 10 55 31.3200 -97.3300 251.000 457.0 127.109 3.040 -999.990 -999.990 1.271 ..P WKT 2010 10 02 00 11 25 31.3200 -97.3300 251.000 457.0 120.595 4.490 -999.990 -999.990 1.206 ..P WKT 2010 10 02 00 11 55 31.3200 -97.3300 251.000 457.0 121.449 3.870 -999.990 -999.990 1.214 ..P WKT 2010 10 02 00 12 25 31.3200 -97.3300 251.000 457.0 126.942 3.060 -999.990 -999.990 1.269 ..P WKT 2010 10 02 00 12 55 31.3200 -97.3300 251.000 457.0 123.566 3.790 -999.990 -999.990 1.236 ..P WKT 2010 10 02 00 13 25 31.3200 -97.3300 251.000 457.0 124.148 3.690 -999.990 -999.990 1.241 ..P WKT 2010 10 02 00 13 55 31.3200 -97.3300 251.000 457.0 126.775 2.990 -999.990 -999.990 1.268 ..P WKT 2010 10 02 00 14 25 31.3200 -97.3300 251.000 457.0 127.493 3.430 -999.990 -999.990 1.275 ..P WKT 2010 10 02 00 14 55 31.3200 -97.3300 251.000 457.0 125.891 3.380 -999.990 -999.990 1.259 ..P WKT 2010 10 02 00 19 55 31.3200 -97.3300 251.000 30.0 120.650 3.490 -999.990 -999.990 1.207 ..P WKT 2010 10 02 00 24 55 31.3200 -97.3300 251.000 122.0 124.415 2.880 -999.990 -999.990 1.244 ..P WKT 2010 10 02 00 29 55 31.3200 -97.3300 251.000 457.0 127.906 2.940 -999.990 -999.990 1.279 ..P WKT 2010 10 02 00 34 55 31.3200 -97.3300 251.000 30.0 126.213 2.980 -999.990 -999.990 1.262 ..P WKT 2010 10 02 00 39 55 31.3200 -97.3300 251.000 122.0 132.434 2.530 -999.990 -999.990 1.324 ..P WKT 2010 10 02 00 44 55 31.3200 -97.3300 251.000 457.0 132.106 4.250 -999.990 -999.990 1.321 ..P WKT 2010 10 02 00 54 55 31.3200 -97.3300 251.000 30.0 140.637 3.950 -999.990 -999.990 1.406 ..P WKT 2010 10 02 00 59 55 31.3200 -97.3300 251.000 122.0 127.527 3.400 -999.990 -999.990 1.275 ..P WKT 2010 10 02 01 04 55 31.3200 -97.3300 251.000 457.0 130.519 3.040 -999.990 -999.990 1.305 ..P WKT 2010 10 02 01 09 55 31.3200 -97.3300 251.000 30.0 133.238 3.300 -999.990 -999.990 1.332 ..P WKT 2010 10 02 01 14 55 31.3200 -97.3300 251.000 122.0 118.626 3.400 -999.990 -999.990 1.186 ..P WKT 2010 10 02 01 19 55 31.3200 -97.3300 251.000 457.0 116.568 3.110 -999.990 -999.990 1.166 ..P WKT 2010 10 02 01 29 55 31.3200 -97.3300 251.000 30.0 133.744 3.110 -999.990 -999.990 1.337 ..P WKT 2010 10 02 01 34 55 31.3200 -97.3300 251.000 122.0 123.361 2.950 -999.990 -999.990 1.234 ..P WKT 2010 10 02 01 39 55 31.3200 -97.3300 251.000 457.0 122.396 3.020 -999.990 -999.990 1.224 ..P WKT 2010 10 02 01 44 55 31.3200 -97.3300 251.000 30.0 143.813 4.500 -999.990 -999.990 1.438 ..P WKT 2010 10 02 01 49 55 31.3200 -97.3300 251.000 122.0 130.291 3.770 -999.990 -999.990 1.303 ..P WKT 2010 10 02 01 54 55 31.3200 -97.3300 251.000 457.0 130.691 2.310 -999.990 -999.990 1.307 ..P WKT 2010 10 02 02 04 55 31.3200 -97.3300 251.000 30.0 157.911 3.020 -999.990 -999.990 1.579 ..P WKT 2010 10 02 02 09 55 31.3200 -97.3300 251.000 122.0 129.588 3.650 -999.990 -999.990 1.296 ..P WKT 2010 10 02 02 14 55 31.3200 -97.3300 251.000 457.0 129.383 4.680 -999.990 -999.990 1.294 ..P WKT 2010 10 02 02 19 55 31.3200 -97.3300 251.000 30.0 167.945 3.750 -999.990 -999.990 1.679 ..P WKT 2010 10 02 02 24 55 31.3200 -97.3300 251.000 122.0 122.693 3.600 -999.990 -999.990 1.227 ..P WKT 2010 10 02 02 29 55 31.3200 -97.3300 251.000 457.0 129.040 3.740 -999.990 -999.990 1.290 ..P WKT 2010 10 02 02 39 55 31.3200 -97.3300 251.000 30.0 155.738 4.360 -999.990 -999.990 1.557 ..P WKT 2010 10 02 02 44 55 31.3200 -97.3300 251.000 122.0 155.884 4.060 -999.990 -999.990 1.559 ..P WKT 2010 10 02 02 49 55 31.3200 -97.3300 251.000 457.0 122.719 3.700 -999.990 -999.990 1.227 ..P WKT 2010 10 02 02 54 55 31.3200 -97.3300 251.000 30.0 163.277 3.590 -999.990 -999.990 1.633 ..P WKT 2010 10 02 02 59 55 31.3200 -97.3300 251.000 122.0 157.143 4.330 -999.990 -999.990 1.571 ..P WKT 2010 10 02 03 04 55 31.3200 -97.3300 251.000 457.0 114.418 4.730 -999.990 -999.990 1.144 ..P WKT 2010 10 02 03 14 55 31.3200 -97.3300 251.000 30.0 142.447 3.320 -999.990 -999.990 1.424 ..P WKT 2010 10 02 03 19 55 31.3200 -97.3300 251.000 122.0 117.625 3.450 -999.990 -999.990 1.176 ..P WKT 2010 10 02 03 24 55 31.3200 -97.3300 251.000 457.0 126.666 4.110 -999.990 -999.990 1.267 ..P WKT 2010 10 02 03 29 55 31.3200 -97.3300 251.000 30.0 141.715 4.240 -999.990 -999.990 1.417 ..P WKT 2010 10 02 03 34 55 31.3200 -97.3300 251.000 122.0 117.166 4.180 -999.990 -999.990 1.172 ..P WKT 2010 10 02 03 39 55 31.3200 -97.3300 251.000 457.0 126.889 4.550 -999.990 -999.990 1.269 ..P WKT 2010 10 02 03 49 55 31.3200 -97.3300 251.000 30.0 137.345 4.480 -999.990 -999.990 1.373 ..P WKT 2010 10 02 03 54 55 31.3200 -97.3300 251.000 122.0 132.477 3.640 -999.990 -999.990 1.325 ..P WKT 2010 10 02 03 59 55 31.3200 -97.3300 251.000 457.0 116.274 5.560 -999.990 -999.990 1.163 ..P WKT 2010 10 02 04 04 55 31.3200 -97.3300 251.000 30.0 140.768 3.900 -999.990 -999.990 1.408 ..P WKT 2010 10 02 04 09 55 31.3200 -97.3300 251.000 122.0 123.335 3.110 -999.990 -999.990 1.233 ..P WKT 2010 10 02 04 14 55 31.3200 -97.3300 251.000 457.0 115.872 2.550 -999.990 -999.990 1.159 ..P WKT 2010 10 02 04 24 55 31.3200 -97.3300 251.000 30.0 141.294 3.570 -999.990 -999.990 1.413 ..P WKT 2010 10 02 04 29 55 31.3200 -97.3300 251.000 122.0 109.168 3.100 -999.990 -999.990 1.092 ..P WKT 2010 10 02 04 34 55 31.3200 -97.3300 251.000 457.0 116.923 3.790 -999.990 -999.990 1.169 ..P WKT 2010 10 02 04 39 55 31.3200 -97.3300 251.000 30.0 143.527 2.790 -999.990 -999.990 1.435 ..P WKT 2010 10 02 04 44 55 31.3200 -97.3300 251.000 122.0 118.775 2.700 -999.990 -999.990 1.188 ..P WKT 2010 10 02 04 49 55 31.3200 -97.3300 251.000 457.0 124.619 2.280 -999.990 -999.990 1.246 ..P WKT 2010 10 02 05 04 55 31.3200 -97.3300 251.000 30.0 140.244 2.480 -999.990 -999.990 1.402 ..P WKT 2010 10 02 05 09 55 31.3200 -97.3300 251.000 122.0 112.623 2.720 -999.990 -999.990 1.126 ..P WKT 2010 10 02 05 14 55 31.3200 -97.3300 251.000 457.0 116.966 5.190 -999.990 -999.990 1.170 ..P WKT 2010 10 02 05 19 55 31.3200 -97.3300 251.000 30.0 139.343 2.780 -999.990 -999.990 1.393 ..P WKT 2010 10 02 05 24 55 31.3200 -97.3300 251.000 122.0 118.551 4.190 -999.990 -999.990 1.186 ..P WKT 2010 10 02 05 29 55 31.3200 -97.3300 251.000 457.0 125.218 3.160 -999.990 -999.990 1.252 ..P WKT 2010 10 02 05 39 55 31.3200 -97.3300 251.000 30.0 150.630 3.020 -999.990 -999.990 1.506 ..P WKT 2010 10 02 05 44 55 31.3200 -97.3300 251.000 122.0 113.225 2.330 -999.990 -999.990 1.132 ..P WKT 2010 10 02 05 49 55 31.3200 -97.3300 251.000 457.0 128.283 4.520 -999.990 -999.990 1.283 ..P WKT 2010 10 02 05 54 55 31.3200 -97.3300 251.000 30.0 155.090 5.370 -999.990 -999.990 1.551 ..P WKT 2010 10 02 05 59 55 31.3200 -97.3300 251.000 122.0 124.515 3.970 -999.990 -999.990 1.245 ..P WKT 2010 10 02 06 04 55 31.3200 -97.3300 251.000 457.0 124.544 2.760 -999.990 -999.990 1.245 ..P WKT 2010 10 02 06 14 55 31.3200 -97.3300 251.000 30.0 154.467 3.240 -999.990 -999.990 1.545 ..P WKT 2010 10 02 06 19 55 31.3200 -97.3300 251.000 122.0 122.054 4.480 -999.990 -999.990 1.221 ..P WKT 2010 10 02 06 24 55 31.3200 -97.3300 251.000 457.0 121.614 4.750 -999.990 -999.990 1.216 ..P WKT 2010 10 02 06 29 55 31.3200 -97.3300 251.000 30.0 142.218 6.470 -999.990 -999.990 1.422 ..P WKT 2010 10 02 06 34 55 31.3200 -97.3300 251.000 122.0 126.474 5.220 -999.990 -999.990 1.265 ..P WKT 2010 10 02 06 39 55 31.3200 -97.3300 251.000 457.0 112.095 3.560 -999.990 -999.990 1.121 ..P WKT 2010 10 02 06 49 55 31.3200 -97.3300 251.000 30.0 140.343 4.040 -999.990 -999.990 1.403 ..P WKT 2010 10 02 06 54 55 31.3200 -97.3300 251.000 122.0 122.840 5.120 -999.990 -999.990 1.228 ..P WKT 2010 10 02 06 59 55 31.3200 -97.3300 251.000 457.0 115.177 5.890 -999.990 -999.990 1.152 ..P WKT 2010 10 02 07 04 55 31.3200 -97.3300 251.000 30.0 151.793 6.670 -999.990 -999.990 1.518 ..P WKT 2010 10 02 07 09 55 31.3200 -97.3300 251.000 122.0 118.162 5.570 -999.990 -999.990 1.182 ..P WKT 2010 10 02 07 14 55 31.3200 -97.3300 251.000 457.0 129.086 3.650 -999.990 -999.990 1.291 ..P WKT 2010 10 02 07 24 55 31.3200 -97.3300 251.000 30.0 159.565 4.100 -999.990 -999.990 1.596 ..P WKT 2010 10 02 07 29 55 31.3200 -97.3300 251.000 122.0 121.304 5.650 -999.990 -999.990 1.213 ..P WKT 2010 10 02 07 34 55 31.3200 -97.3300 251.000 457.0 120.903 6.290 -999.990 -999.990 1.209 ..P WKT 2010 10 02 07 39 55 31.3200 -97.3300 251.000 30.0 151.531 5.690 -999.990 -999.990 1.515 ..P WKT 2010 10 02 07 44 55 31.3200 -97.3300 251.000 122.0 126.252 5.900 -999.990 -999.990 1.263 ..P WKT 2010 10 02 07 49 55 31.3200 -97.3300 251.000 457.0 114.233 3.330 -999.990 -999.990 1.142 ..P WKT 2010 10 02 07 59 55 31.3200 -97.3300 251.000 30.0 154.909 4.080 -999.990 -999.990 1.549 ..P WKT 2010 10 02 08 04 55 31.3200 -97.3300 251.000 122.0 122.853 5.120 -999.990 -999.990 1.229 ..P WKT 2010 10 02 08 09 55 31.3200 -97.3300 251.000 457.0 116.769 5.590 -999.990 -999.990 1.168 ..P WKT 2010 10 02 08 14 55 31.3200 -97.3300 251.000 30.0 157.985 4.470 -999.990 -999.990 1.580 ..P WKT 2010 10 02 08 19 55 31.3200 -97.3300 251.000 122.0 119.638 3.470 -999.990 -999.990 1.196 ..P WKT 2010 10 02 08 24 55 31.3200 -97.3300 251.000 457.0 122.167 3.100 -999.990 -999.990 1.222 ..P WKT 2010 10 02 08 34 55 31.3200 -97.3300 251.000 30.0 162.068 2.950 -999.990 -999.990 1.621 ..P WKT 2010 10 02 08 39 55 31.3200 -97.3300 251.000 122.0 118.640 3.570 -999.990 -999.990 1.186 ..P WKT 2010 10 02 08 44 55 31.3200 -97.3300 251.000 457.0 118.551 4.360 -999.990 -999.990 1.186 ..P WKT 2010 10 02 08 49 55 31.3200 -97.3300 251.000 30.0 159.755 3.340 -999.990 -999.990 1.598 ..P WKT 2010 10 02 08 54 55 31.3200 -97.3300 251.000 122.0 111.538 2.750 -999.990 -999.990 1.115 ..P WKT 2010 10 02 08 59 55 31.3200 -97.3300 251.000 457.0 115.552 2.510 -999.990 -999.990 1.156 ..P WKT 2010 10 02 09 09 55 31.3200 -97.3300 251.000 30.0 150.770 4.010 -999.990 -999.990 1.508 ..P WKT 2010 10 02 09 14 55 31.3200 -97.3300 251.000 122.0 108.820 4.080 -999.990 -999.990 1.088 ..P WKT 2010 10 02 09 19 55 31.3200 -97.3300 251.000 457.0 117.326 3.220 -999.990 -999.990 1.173 ..P WKT 2010 10 02 09 24 55 31.3200 -97.3300 251.000 30.0 152.636 3.820 -999.990 -999.990 1.526 ..P WKT 2010 10 02 09 29 55 31.3200 -97.3300 251.000 122.0 117.794 3.000 -999.990 -999.990 1.178 ..P WKT 2010 10 02 09 34 55 31.3200 -97.3300 251.000 457.0 125.617 3.470 -999.990 -999.990 1.256 ..P WKT 2010 10 02 09 44 55 31.3200 -97.3300 251.000 30.0 154.179 2.970 -999.990 -999.990 1.542 ..P WKT 2010 10 02 09 49 55 31.3200 -97.3300 251.000 122.0 114.744 2.940 -999.990 -999.990 1.147 ..P WKT 2010 10 02 09 54 55 31.3200 -97.3300 251.000 457.0 124.815 4.570 -999.990 -999.990 1.248 ..P WKT 2010 10 02 09 59 55 31.3200 -97.3300 251.000 30.0 153.486 4.440 -999.990 -999.990 1.535 ..P WKT 2010 10 02 10 04 55 31.3200 -97.3300 251.000 122.0 123.075 3.870 -999.990 -999.990 1.231 ..P WKT 2010 10 02 10 09 55 31.3200 -97.3300 251.000 457.0 115.640 3.010 -999.990 -999.990 1.156 ..P WKT 2010 10 02 10 19 55 31.3200 -97.3300 251.000 30.0 162.905 3.330 -999.990 -999.990 1.629 ..P WKT 2010 10 02 10 24 55 31.3200 -97.3300 251.000 122.0 121.040 3.960 -999.990 -999.990 1.210 ..P WKT 2010 10 02 10 29 55 31.3200 -97.3300 251.000 457.0 118.568 3.300 -999.990 -999.990 1.186 ..P WKT 2010 10 02 10 34 55 31.3200 -97.3300 251.000 30.0 176.828 4.560 -999.990 -999.990 1.768 ..P WKT 2010 10 02 10 39 55 31.3200 -97.3300 251.000 122.0 128.122 3.330 -999.990 -999.990 1.281 ..P WKT 2010 10 02 10 44 55 31.3200 -97.3300 251.000 457.0 122.093 3.330 -999.990 -999.990 1.221 ..P WKT 2010 10 02 10 54 55 31.3200 -97.3300 251.000 30.0 178.863 3.720 -999.990 -999.990 1.789 ..P WKT 2010 10 02 10 59 55 31.3200 -97.3300 251.000 122.0 128.941 3.890 -999.990 -999.990 1.289 ..P WKT 2010 10 02 11 04 55 31.3200 -97.3300 251.000 457.0 123.069 4.000 -999.990 -999.990 1.231 ..P WKT 2010 10 02 11 09 55 31.3200 -97.3300 251.000 30.0 173.285 3.810 -999.990 -999.990 1.733 ..P WKT 2010 10 02 11 14 55 31.3200 -97.3300 251.000 122.0 128.286 3.640 -999.990 -999.990 1.283 ..P WKT 2010 10 02 11 19 55 31.3200 -97.3300 251.000 457.0 118.445 4.610 -999.990 -999.990 1.184 ..P WKT 2010 10 02 11 29 55 31.3200 -97.3300 251.000 30.0 172.229 4.680 -999.990 -999.990 1.722 ..P WKT 2010 10 02 11 34 55 31.3200 -97.3300 251.000 122.0 134.338 3.130 -999.990 -999.990 1.343 ..P WKT 2010 10 02 11 39 55 31.3200 -97.3300 251.000 457.0 117.106 4.690 -999.990 -999.990 1.171 ..P WKT 2010 10 02 11 44 55 31.3200 -97.3300 251.000 30.0 175.400 5.130 -999.990 -999.990 1.754 ..P WKT 2010 10 02 11 49 55 31.3200 -97.3300 251.000 122.0 142.706 4.450 -999.990 -999.990 1.427 ..P WKT 2010 10 02 12 09 55 31.3200 -97.3300 251.000 457.0 115.230 3.190 -999.990 -999.990 1.152 ..P WKT 2010 10 02 12 10 25 31.3200 -97.3300 251.000 457.0 116.257 3.470 -999.990 -999.990 1.163 ..P WKT 2010 10 02 12 10 55 31.3200 -97.3300 251.000 457.0 114.547 3.130 -999.990 -999.990 1.145 ..P WKT 2010 10 02 12 11 25 31.3200 -97.3300 251.000 457.0 115.847 3.180 -999.990 -999.990 1.158 ..P WKT 2010 10 02 12 11 55 31.3200 -97.3300 251.000 457.0 114.685 3.300 -999.990 -999.990 1.147 ..P WKT 2010 10 02 12 12 25 31.3200 -97.3300 251.000 457.0 117.628 3.290 -999.990 -999.990 1.176 ..P WKT 2010 10 02 12 12 55 31.3200 -97.3300 251.000 457.0 117.696 3.320 -999.990 -999.990 1.177 ..P WKT 2010 10 02 12 13 25 31.3200 -97.3300 251.000 457.0 117.218 3.590 -999.990 -999.990 1.172 ..P WKT 2010 10 02 12 13 55 31.3200 -97.3300 251.000 457.0 117.697 3.970 -999.990 -999.990 1.177 ..P WKT 2010 10 02 12 14 25 31.3200 -97.3300 251.000 457.0 114.893 3.560 -999.990 -999.990 1.149 ..P WKT 2010 10 02 12 14 55 31.3200 -97.3300 251.000 457.0 116.193 3.490 -999.990 -999.990 1.162 ..P WKT 2010 10 02 12 19 55 31.3200 -97.3300 251.000 30.0 176.952 4.700 -999.990 -999.990 1.770 ..P WKT 2010 10 02 12 24 55 31.3200 -97.3300 251.000 122.0 133.991 4.240 -999.990 -999.990 1.340 ..P WKT 2010 10 02 12 29 55 31.3200 -97.3300 251.000 457.0 113.881 4.960 -999.990 -999.990 1.139 ..P WKT 2010 10 02 12 34 55 31.3200 -97.3300 251.000 30.0 172.725 4.170 -999.990 -999.990 1.727 ..P WKT 2010 10 02 12 39 55 31.3200 -97.3300 251.000 122.0 136.605 3.870 -999.990 -999.990 1.366 ..P WKT 2010 10 02 12 44 55 31.3200 -97.3300 251.000 457.0 109.517 4.720 -999.990 -999.990 1.095 ..P WKT 2010 10 02 12 54 55 31.3200 -97.3300 251.000 30.0 184.088 4.050 -999.990 -999.990 1.841 ..P WKT 2010 10 02 12 59 55 31.3200 -97.3300 251.000 122.0 113.470 3.970 -999.990 -999.990 1.135 ..P WKT 2010 10 02 13 04 55 31.3200 -97.3300 251.000 457.0 111.954 4.530 -999.990 -999.990 1.120 ..P WKT 2010 10 02 13 09 55 31.3200 -97.3300 251.000 30.0 182.690 4.410 -999.990 -999.990 1.827 ..P WKT 2010 10 02 13 14 55 31.3200 -97.3300 251.000 122.0 137.933 3.170 -999.990 -999.990 1.379 ..P WKT 2010 10 02 13 19 55 31.3200 -97.3300 251.000 457.0 117.807 3.180 -999.990 -999.990 1.178 ..P WKT 2010 10 02 13 29 55 31.3200 -97.3300 251.000 30.0 183.335 3.660 -999.990 -999.990 1.833 ..P WKT 2010 10 02 13 34 55 31.3200 -97.3300 251.000 122.0 132.419 6.850 -999.990 -999.990 1.324 ..P WKT 2010 10 02 13 39 55 31.3200 -97.3300 251.000 457.0 120.639 3.580 -999.990 -999.990 1.206 ..P WKT 2010 10 02 13 44 55 31.3200 -97.3300 251.000 30.0 185.220 4.040 -999.990 -999.990 1.852 ..P WKT 2010 10 02 13 49 55 31.3200 -97.3300 251.000 122.0 139.230 4.570 -999.990 -999.990 1.392 ..P WKT 2010 10 02 13 54 55 31.3200 -97.3300 251.000 457.0 126.356 4.480 -999.990 -999.990 1.264 ..P WKT 2010 10 02 14 04 55 31.3200 -97.3300 251.000 30.0 182.209 5.870 -999.990 -999.990 1.822 ..P WKT 2010 10 02 14 09 55 31.3200 -97.3300 251.000 122.0 147.478 6.050 -999.990 -999.990 1.475 ..P WKT 2010 10 02 14 14 55 31.3200 -97.3300 251.000 457.0 124.790 3.750 -999.990 -999.990 1.248 ..P WKT 2010 10 02 14 19 55 31.3200 -97.3300 251.000 30.0 173.811 4.180 -999.990 -999.990 1.738 ..P WKT 2010 10 02 14 24 55 31.3200 -97.3300 251.000 122.0 152.765 3.450 -999.990 -999.990 1.528 ..P WKT 2010 10 02 14 29 55 31.3200 -97.3300 251.000 457.0 121.866 3.640 -999.990 -999.990 1.219 ..P WKT 2010 10 02 14 39 55 31.3200 -97.3300 251.000 30.0 168.726 3.430 -999.990 -999.990 1.687 ..P WKT 2010 10 02 14 44 55 31.3200 -97.3300 251.000 122.0 151.238 3.610 -999.990 -999.990 1.512 ..P WKT 2010 10 02 14 49 55 31.3200 -97.3300 251.000 457.0 124.171 3.350 -999.990 -999.990 1.242 ..P WKT 2010 10 02 14 54 55 31.3200 -97.3300 251.000 30.0 168.267 4.860 -999.990 -999.990 1.683 ..P WKT 2010 10 02 14 59 55 31.3200 -97.3300 251.000 122.0 159.811 3.340 -999.990 -999.990 1.598 ..P WKT 2010 10 02 15 04 55 31.3200 -97.3300 251.000 457.0 119.056 3.390 -999.990 -999.990 1.191 ..P WKT 2010 10 02 15 14 55 31.3200 -97.3300 251.000 30.0 159.018 4.010 -999.990 -999.990 1.590 ..P WKT 2010 10 02 15 19 55 31.3200 -97.3300 251.000 122.0 164.188 3.450 -999.990 -999.990 1.642 ..P WKT 2010 10 02 15 24 55 31.3200 -97.3300 251.000 457.0 122.827 4.340 -999.990 -999.990 1.228 ..P WKT 2010 10 02 15 29 55 31.3200 -97.3300 251.000 30.0 161.392 3.770 -999.990 -999.990 1.614 ..P WKT 2010 10 02 15 34 55 31.3200 -97.3300 251.000 122.0 153.014 4.850 -999.990 -999.990 1.530 ..P WKT 2010 10 02 15 39 55 31.3200 -97.3300 251.000 457.0 125.749 3.320 -999.990 -999.990 1.257 ..P WKT 2010 10 02 15 49 55 31.3200 -97.3300 251.000 30.0 158.888 3.710 -999.990 -999.990 1.589 ..P WKT 2010 10 02 15 54 55 31.3200 -97.3300 251.000 122.0 160.442 4.250 -999.990 -999.990 1.604 ..P WKT 2010 10 02 15 59 55 31.3200 -97.3300 251.000 457.0 119.021 3.210 -999.990 -999.990 1.190 ..P WKT 2010 10 02 16 04 55 31.3200 -97.3300 251.000 30.0 151.779 4.560 -999.990 -999.990 1.518 ..P WKT 2010 10 02 16 09 55 31.3200 -97.3300 251.000 122.0 146.354 3.280 -999.990 -999.990 1.464 ..P WKT 2010 10 02 16 14 55 31.3200 -97.3300 251.000 457.0 119.303 3.290 -999.990 -999.990 1.193 ..P WKT 2010 10 02 16 24 55 31.3200 -97.3300 251.000 30.0 144.173 3.500 -999.990 -999.990 1.442 ..P WKT 2010 10 02 16 29 55 31.3200 -97.3300 251.000 122.0 148.737 4.970 -999.990 -999.990 1.487 ..P WKT 2010 10 02 16 34 55 31.3200 -97.3300 251.000 457.0 117.444 3.390 -999.990 -999.990 1.174 ..P WKT 2010 10 02 16 39 55 31.3200 -97.3300 251.000 30.0 143.633 4.400 -999.990 -999.990 1.436 ..P WKT 2010 10 02 16 44 55 31.3200 -97.3300 251.000 122.0 149.977 3.590 -999.990 -999.990 1.500 ..P WKT 2010 10 02 16 49 55 31.3200 -97.3300 251.000 457.0 117.999 3.650 -999.990 -999.990 1.180 ..P WKT 2010 10 02 17 04 55 31.3200 -97.3300 251.000 30.0 152.209 3.870 -999.990 -999.990 1.522 ..P WKT 2010 10 02 17 09 55 31.3200 -97.3300 251.000 122.0 150.540 3.850 -999.990 -999.990 1.505 ..P WKT 2010 10 02 17 14 55 31.3200 -97.3300 251.000 457.0 124.371 3.990 -999.990 -999.990 1.244 ..P WKT 2010 10 02 17 19 55 31.3200 -97.3300 251.000 30.0 145.284 4.100 -999.990 -999.990 1.453 ..P WKT 2010 10 02 17 24 55 31.3200 -97.3300 251.000 122.0 140.740 4.270 -999.990 -999.990 1.407 ..P WKT 2010 10 02 17 29 55 31.3200 -97.3300 251.000 457.0 137.291 3.920 -999.990 -999.990 1.373 ..P WKT 2010 10 02 17 39 55 31.3200 -97.3300 251.000 30.0 142.005 4.110 -999.990 -999.990 1.420 ..P WKT 2010 10 02 17 44 55 31.3200 -97.3300 251.000 122.0 145.788 3.930 -999.990 -999.990 1.458 ..P WKT 2010 10 02 17 49 55 31.3200 -97.3300 251.000 457.0 139.443 3.940 -999.990 -999.990 1.394 ..P WKT 2010 10 02 17 54 55 31.3200 -97.3300 251.000 30.0 143.773 4.190 -999.990 -999.990 1.438 ..P WKT 2010 10 02 17 59 55 31.3200 -97.3300 251.000 122.0 149.473 4.140 -999.990 -999.990 1.495 ..P WKT 2010 10 02 18 04 55 31.3200 -97.3300 251.000 457.0 141.485 4.170 -999.990 -999.990 1.415 ..P WKT 2010 10 02 18 14 55 31.3200 -97.3300 251.000 30.0 134.855 3.950 -999.990 -999.990 1.349 ..P WKT 2010 10 02 18 19 55 31.3200 -97.3300 251.000 122.0 141.141 3.880 -999.990 -999.990 1.411 ..P WKT 2010 10 02 18 24 55 31.3200 -97.3300 251.000 457.0 132.918 4.980 -999.990 -999.990 1.329 ..P WKT 2010 10 02 18 29 55 31.3200 -97.3300 251.000 30.0 138.109 3.930 -999.990 -999.990 1.381 ..P WKT 2010 10 02 18 34 55 31.3200 -97.3300 251.000 122.0 136.730 3.880 -999.990 -999.990 1.367 ..P WKT 2010 10 02 18 39 55 31.3200 -97.3300 251.000 457.0 131.793 4.120 -999.990 -999.990 1.318 ..P WKT 2010 10 02 18 49 55 31.3200 -97.3300 251.000 30.0 138.772 3.660 -999.990 -999.990 1.388 ..P WKT 2010 10 02 18 54 55 31.3200 -97.3300 251.000 122.0 142.478 4.600 -999.990 -999.990 1.425 ..P WKT 2010 10 02 18 59 55 31.3200 -97.3300 251.000 457.0 136.875 4.130 -999.990 -999.990 1.369 ..P WKT 2010 10 02 19 04 55 31.3200 -97.3300 251.000 30.0 134.010 4.690 -999.990 -999.990 1.340 ..P WKT 2010 10 02 19 09 55 31.3200 -97.3300 251.000 122.0 139.357 3.900 -999.990 -999.990 1.394 ..P WKT 2010 10 02 19 14 55 31.3200 -97.3300 251.000 457.0 139.504 4.240 -999.990 -999.990 1.395 ..P WKT 2010 10 02 19 24 55 31.3200 -97.3300 251.000 30.0 137.625 4.030 -999.990 -999.990 1.376 ..P WKT 2010 10 02 19 29 55 31.3200 -97.3300 251.000 122.0 143.540 5.890 -999.990 -999.990 1.435 ..P WKT 2010 10 02 19 34 55 31.3200 -97.3300 251.000 457.0 140.147 4.360 -999.990 -999.990 1.401 ..P WKT 2010 10 02 19 39 55 31.3200 -97.3300 251.000 30.0 141.271 4.120 -999.990 -999.990 1.413 ..P WKT 2010 10 02 19 44 55 31.3200 -97.3300 251.000 122.0 135.687 4.390 -999.990 -999.990 1.357 ..P WKT 2010 10 02 19 49 55 31.3200 -97.3300 251.000 457.0 132.157 5.170 -999.990 -999.990 1.322 ..P WKT 2010 10 02 19 59 55 31.3200 -97.3300 251.000 30.0 136.986 4.730 -999.990 -999.990 1.370 ..P WKT 2010 10 02 20 04 55 31.3200 -97.3300 251.000 122.0 137.680 4.180 -999.990 -999.990 1.377 ..P WKT 2010 10 02 20 09 55 31.3200 -97.3300 251.000 457.0 133.446 4.900 -999.990 -999.990 1.334 ..P WKT 2010 10 02 20 14 55 31.3200 -97.3300 251.000 30.0 134.414 4.540 -999.990 -999.990 1.344 ..P WKT 2010 10 02 20 19 55 31.3200 -97.3300 251.000 122.0 139.488 4.630 -999.990 -999.990 1.395 ..P WKT 2010 10 02 20 24 55 31.3200 -97.3300 251.000 457.0 134.707 4.520 -999.990 -999.990 1.347 ..P WKT 2010 10 02 20 34 55 31.3200 -97.3300 251.000 30.0 137.874 4.300 -999.990 -999.990 1.379 ..P WKT 2010 10 02 20 39 55 31.3200 -97.3300 251.000 122.0 138.156 4.330 -999.990 -999.990 1.382 ..P WKT 2010 10 02 20 44 55 31.3200 -97.3300 251.000 457.0 137.892 4.900 -999.990 -999.990 1.379 ..P WKT 2010 10 02 20 49 55 31.3200 -97.3300 251.000 30.0 135.848 4.140 -999.990 -999.990 1.358 ..P WKT 2010 10 02 20 54 55 31.3200 -97.3300 251.000 122.0 135.447 4.930 -999.990 -999.990 1.354 ..P WKT 2010 10 02 20 59 55 31.3200 -97.3300 251.000 457.0 134.771 4.140 -999.990 -999.990 1.348 ..P WKT 2010 10 02 21 09 55 31.3200 -97.3300 251.000 30.0 136.080 3.970 -999.990 -999.990 1.361 ..P WKT 2010 10 02 21 14 55 31.3200 -97.3300 251.000 122.0 132.452 3.960 -999.990 -999.990 1.325 ..P WKT 2010 10 02 21 19 55 31.3200 -97.3300 251.000 457.0 142.103 4.050 -999.990 -999.990 1.421 ..P WKT 2010 10 02 21 24 55 31.3200 -97.3300 251.000 30.0 135.052 4.010 -999.990 -999.990 1.351 ..P WKT 2010 10 02 21 29 55 31.3200 -97.3300 251.000 122.0 139.502 4.050 -999.990 -999.990 1.395 ..P WKT 2010 10 02 21 34 55 31.3200 -97.3300 251.000 457.0 137.106 4.180 -999.990 -999.990 1.371 ..P WKT 2010 10 02 21 44 55 31.3200 -97.3300 251.000 30.0 136.224 4.590 -999.990 -999.990 1.362 ..P WKT 2010 10 02 21 49 55 31.3200 -97.3300 251.000 122.0 139.109 5.470 -999.990 -999.990 1.391 ..P WKT 2010 10 02 21 54 55 31.3200 -97.3300 251.000 457.0 134.052 4.240 -999.990 -999.990 1.341 ..P WKT 2010 10 02 21 59 55 31.3200 -97.3300 251.000 30.0 137.484 4.020 -999.990 -999.990 1.375 ..P WKT 2010 10 02 22 04 55 31.3200 -97.3300 251.000 122.0 137.630 4.110 -999.990 -999.990 1.376 ..P WKT 2010 10 02 22 09 55 31.3200 -97.3300 251.000 457.0 138.324 4.130 -999.990 -999.990 1.383 ..P WKT 2010 10 02 22 19 55 31.3200 -97.3300 251.000 30.0 143.271 4.270 -999.990 -999.990 1.433 ..P WKT 2010 10 02 22 24 55 31.3200 -97.3300 251.000 122.0 145.335 4.600 -999.990 -999.990 1.453 ..P WKT 2010 10 02 22 29 55 31.3200 -97.3300 251.000 457.0 140.279 5.260 -999.990 -999.990 1.403 ..P WKT 2010 10 02 22 34 55 31.3200 -97.3300 251.000 30.0 141.246 4.720 -999.990 -999.990 1.412 ..P WKT 2010 10 02 22 39 55 31.3200 -97.3300 251.000 122.0 148.238 5.200 -999.990 -999.990 1.482 ..P WKT 2010 10 02 22 44 55 31.3200 -97.3300 251.000 457.0 142.907 6.050 -999.990 -999.990 1.429 ..P WKT 2010 10 02 22 54 55 31.3200 -97.3300 251.000 30.0 142.301 5.280 -999.990 -999.990 1.423 ..P WKT 2010 10 02 22 59 55 31.3200 -97.3300 251.000 122.0 145.928 5.130 -999.990 -999.990 1.459 ..P WKT 2010 10 02 23 04 55 31.3200 -97.3300 251.000 457.0 143.258 4.610 -999.990 -999.990 1.433 ..P WKT 2010 10 02 23 09 55 31.3200 -97.3300 251.000 30.0 144.148 4.640 -999.990 -999.990 1.441 ..P WKT 2010 10 02 23 14 55 31.3200 -97.3300 251.000 122.0 146.543 5.030 -999.990 -999.990 1.465 ..P WKT 2010 10 02 23 19 55 31.3200 -97.3300 251.000 457.0 147.022 4.060 -999.990 -999.990 1.470 ..P WKT 2010 10 02 23 29 55 31.3200 -97.3300 251.000 30.0 146.771 4.440 -999.990 -999.990 1.468 ..P WKT 2010 10 02 23 34 55 31.3200 -97.3300 251.000 122.0 161.650 4.270 -999.990 -999.990 1.617 ..P WKT 2010 10 02 23 39 55 31.3200 -97.3300 251.000 457.0 151.748 4.300 -999.990 -999.990 1.517 ..P WKT 2010 10 02 23 44 55 31.3200 -97.3300 251.000 30.0 154.305 5.140 -999.990 -999.990 1.543 ..P WKT 2010 10 02 23 49 55 31.3200 -97.3300 251.000 122.0 167.130 5.060 -999.990 -999.990 1.671 ..P WKT 2010 10 03 00 09 55 31.3200 -97.3300 251.000 457.0 166.690 5.000 -999.990 -999.990 1.667 ..P WKT 2010 10 03 00 10 25 31.3200 -97.3300 251.000 457.0 170.327 5.250 -999.990 -999.990 1.703 ..P WKT 2010 10 03 00 10 55 31.3200 -97.3300 251.000 457.0 173.006 4.880 -999.990 -999.990 1.730 ..P WKT 2010 10 03 00 11 25 31.3200 -97.3300 251.000 457.0 165.281 4.660 -999.990 -999.990 1.653 ..P WKT 2010 10 03 00 11 55 31.3200 -97.3300 251.000 457.0 170.835 4.760 -999.990 -999.990 1.708 ..P WKT 2010 10 03 00 12 25 31.3200 -97.3300 251.000 457.0 172.008 4.560 -999.990 -999.990 1.720 ..P WKT 2010 10 03 00 12 55 31.3200 -97.3300 251.000 457.0 172.223 4.400 -999.990 -999.990 1.722 ..P WKT 2010 10 03 00 13 25 31.3200 -97.3300 251.000 457.0 170.932 4.550 -999.990 -999.990 1.709 ..P WKT 2010 10 03 00 13 55 31.3200 -97.3300 251.000 457.0 172.242 4.670 -999.990 -999.990 1.722 ..P WKT 2010 10 03 00 14 25 31.3200 -97.3300 251.000 457.0 166.434 4.910 -999.990 -999.990 1.664 ..P WKT 2010 10 03 00 14 55 31.3200 -97.3300 251.000 457.0 166.238 4.820 -999.990 -999.990 1.662 ..P WKT 2010 10 03 00 19 55 31.3200 -97.3300 251.000 30.0 165.239 5.240 -999.990 -999.990 1.652 ..P WKT 2010 10 03 00 24 55 31.3200 -97.3300 251.000 122.0 168.483 5.240 -999.990 -999.990 1.685 ..P WKT 2010 10 03 00 29 55 31.3200 -97.3300 251.000 457.0 161.599 4.700 -999.990 -999.990 1.616 ..P WKT 2010 10 03 00 34 55 31.3200 -97.3300 251.000 30.0 164.022 4.500 -999.990 -999.990 1.640 ..P WKT 2010 10 03 00 39 55 31.3200 -97.3300 251.000 122.0 158.508 4.840 -999.990 -999.990 1.585 ..P WKT 2010 10 03 00 44 55 31.3200 -97.3300 251.000 457.0 151.764 4.500 -999.990 -999.990 1.518 ..P WKT 2010 10 03 00 54 55 31.3200 -97.3300 251.000 30.0 165.648 5.070 -999.990 -999.990 1.656 ..P WKT 2010 10 03 00 59 55 31.3200 -97.3300 251.000 122.0 151.393 4.630 -999.990 -999.990 1.514 ..P WKT 2010 10 03 01 04 55 31.3200 -97.3300 251.000 457.0 145.073 4.520 -999.990 -999.990 1.451 ..P WKT 2010 10 03 01 09 55 31.3200 -97.3300 251.000 30.0 153.250 4.690 -999.990 -999.990 1.532 ..P WKT 2010 10 03 01 14 55 31.3200 -97.3300 251.000 122.0 140.641 5.650 -999.990 -999.990 1.406 ..P WKT 2010 10 03 01 19 55 31.3200 -97.3300 251.000 457.0 157.977 5.970 -999.990 -999.990 1.580 ..P WKT 2010 10 03 01 29 55 31.3200 -97.3300 251.000 30.0 154.285 5.920 -999.990 -999.990 1.543 ..P WKT 2010 10 03 01 34 55 31.3200 -97.3300 251.000 122.0 142.833 4.700 -999.990 -999.990 1.428 ..P WKT 2010 10 03 01 39 55 31.3200 -97.3300 251.000 457.0 147.783 4.650 -999.990 -999.990 1.478 ..P WKT 2010 10 03 01 44 55 31.3200 -97.3300 251.000 30.0 154.647 4.610 -999.990 -999.990 1.546 ..P WKT 2010 10 03 01 49 55 31.3200 -97.3300 251.000 122.0 141.284 4.890 -999.990 -999.990 1.413 ..P WKT 2010 10 03 01 54 55 31.3200 -97.3300 251.000 457.0 147.326 4.980 -999.990 -999.990 1.473 ..P WKT 2010 10 03 02 04 55 31.3200 -97.3300 251.000 30.0 152.422 5.160 -999.990 -999.990 1.524 ..P WKT 2010 10 03 02 09 55 31.3200 -97.3300 251.000 122.0 142.459 4.480 -999.990 -999.990 1.425 ..P WKT 2010 10 03 02 14 55 31.3200 -97.3300 251.000 457.0 147.798 4.660 -999.990 -999.990 1.478 ..P WKT 2010 10 03 02 19 55 31.3200 -97.3300 251.000 30.0 153.682 5.110 -999.990 -999.990 1.537 ..P WKT 2010 10 03 02 24 55 31.3200 -97.3300 251.000 122.0 136.892 4.790 -999.990 -999.990 1.369 ..P WKT 2010 10 03 02 29 55 31.3200 -97.3300 251.000 457.0 150.150 4.630 -999.990 -999.990 1.502 ..P WKT 2010 10 03 02 39 55 31.3200 -97.3300 251.000 30.0 150.327 4.700 -999.990 -999.990 1.503 ..P WKT 2010 10 03 02 44 55 31.3200 -97.3300 251.000 122.0 142.711 5.040 -999.990 -999.990 1.427 ..P WKT 2010 10 03 02 49 55 31.3200 -97.3300 251.000 457.0 147.382 6.000 -999.990 -999.990 1.474 ..P WKT 2010 10 03 02 54 55 31.3200 -97.3300 251.000 30.0 149.597 5.470 -999.990 -999.990 1.496 ..P WKT 2010 10 03 02 59 55 31.3200 -97.3300 251.000 122.0 136.522 4.620 -999.990 -999.990 1.365 ..P WKT 2010 10 03 03 04 55 31.3200 -97.3300 251.000 457.0 138.054 4.820 -999.990 -999.990 1.381 ..P WKT 2010 10 03 03 14 55 31.3200 -97.3300 251.000 30.0 150.846 4.980 -999.990 -999.990 1.508 ..P WKT 2010 10 03 03 19 55 31.3200 -97.3300 251.000 122.0 139.998 4.580 -999.990 -999.990 1.400 ..P WKT 2010 10 03 03 24 55 31.3200 -97.3300 251.000 457.0 142.115 5.720 -999.990 -999.990 1.421 ..P WKT 2010 10 03 03 29 55 31.3200 -97.3300 251.000 30.0 149.142 4.510 -999.990 -999.990 1.491 ..P WKT 2010 10 03 03 34 55 31.3200 -97.3300 251.000 122.0 140.070 5.380 -999.990 -999.990 1.401 ..P WKT 2010 10 03 03 39 55 31.3200 -97.3300 251.000 457.0 146.278 5.220 -999.990 -999.990 1.463 ..P WKT 2010 10 03 03 49 55 31.3200 -97.3300 251.000 30.0 160.347 4.640 -999.990 -999.990 1.603 ..P WKT 2010 10 03 03 54 55 31.3200 -97.3300 251.000 122.0 143.524 4.960 -999.990 -999.990 1.435 ..P WKT 2010 10 03 03 59 55 31.3200 -97.3300 251.000 457.0 140.749 4.800 -999.990 -999.990 1.407 ..P WKT 2010 10 03 04 04 55 31.3200 -97.3300 251.000 30.0 142.747 4.910 -999.990 -999.990 1.427 ..P WKT 2010 10 03 04 09 55 31.3200 -97.3300 251.000 122.0 142.836 5.010 -999.990 -999.990 1.428 ..P WKT 2010 10 03 04 14 55 31.3200 -97.3300 251.000 457.0 139.516 4.650 -999.990 -999.990 1.395 ..P WKT 2010 10 03 04 24 55 31.3200 -97.3300 251.000 30.0 151.260 4.860 -999.990 -999.990 1.513 ..P WKT 2010 10 03 04 29 55 31.3200 -97.3300 251.000 122.0 128.704 4.410 -999.990 -999.990 1.287 ..P WKT 2010 10 03 04 34 55 31.3200 -97.3300 251.000 457.0 139.950 5.240 -999.990 -999.990 1.399 ..P WKT 2010 10 03 04 39 55 31.3200 -97.3300 251.000 30.0 145.879 4.940 -999.990 -999.990 1.459 ..P WKT 2010 10 03 04 44 55 31.3200 -97.3300 251.000 122.0 142.269 4.540 -999.990 -999.990 1.423 ..P WKT 2010 10 03 04 49 55 31.3200 -97.3300 251.000 457.0 138.932 4.800 -999.990 -999.990 1.389 ..P WKT 2010 10 03 05 04 55 31.3200 -97.3300 251.000 30.0 139.802 4.950 -999.990 -999.990 1.398 ..P WKT 2010 10 03 05 09 55 31.3200 -97.3300 251.000 122.0 124.266 5.480 -999.990 -999.990 1.243 ..P WKT 2010 10 03 05 14 55 31.3200 -97.3300 251.000 457.0 125.757 5.040 -999.990 -999.990 1.258 ..P WKT 2010 10 03 05 19 55 31.3200 -97.3300 251.000 30.0 142.772 4.570 -999.990 -999.990 1.428 ..P WKT 2010 10 03 05 24 55 31.3200 -97.3300 251.000 122.0 144.807 4.260 -999.990 -999.990 1.448 ..P WKT 2010 10 03 05 29 55 31.3200 -97.3300 251.000 457.0 135.130 4.240 -999.990 -999.990 1.351 ..P WKT 2010 10 03 05 39 55 31.3200 -97.3300 251.000 30.0 154.193 5.210 -999.990 -999.990 1.542 ..P WKT 2010 10 03 05 44 55 31.3200 -97.3300 251.000 122.0 151.072 4.730 -999.990 -999.990 1.511 ..P WKT 2010 10 03 05 49 55 31.3200 -97.3300 251.000 457.0 139.240 4.140 -999.990 -999.990 1.392 ..P WKT 2010 10 03 05 54 55 31.3200 -97.3300 251.000 30.0 150.548 4.060 -999.990 -999.990 1.505 ..P WKT 2010 10 03 05 59 55 31.3200 -97.3300 251.000 122.0 142.801 4.510 -999.990 -999.990 1.428 ..P WKT 2010 10 03 06 04 55 31.3200 -97.3300 251.000 457.0 128.523 4.660 -999.990 -999.990 1.285 ..P WKT 2010 10 03 06 14 55 31.3200 -97.3300 251.000 30.0 149.773 4.120 -999.990 -999.990 1.498 ..P WKT 2010 10 03 06 19 55 31.3200 -97.3300 251.000 122.0 149.102 5.440 -999.990 -999.990 1.491 ..P WKT 2010 10 03 06 24 55 31.3200 -97.3300 251.000 457.0 134.285 4.010 -999.990 -999.990 1.343 ..P WKT 2010 10 03 06 29 55 31.3200 -97.3300 251.000 30.0 145.314 4.080 -999.990 -999.990 1.453 ..P WKT 2010 10 03 06 34 55 31.3200 -97.3300 251.000 122.0 146.276 4.620 -999.990 -999.990 1.463 ..P WKT 2010 10 03 06 39 55 31.3200 -97.3300 251.000 457.0 126.567 4.590 -999.990 -999.990 1.266 ..P WKT 2010 10 03 06 49 55 31.3200 -97.3300 251.000 30.0 145.880 4.490 -999.990 -999.990 1.459 ..P WKT 2010 10 03 06 54 55 31.3200 -97.3300 251.000 122.0 147.639 4.690 -999.990 -999.990 1.476 ..P WKT 2010 10 03 06 59 55 31.3200 -97.3300 251.000 457.0 114.864 5.900 -999.990 -999.990 1.149 ..P WKT 2010 10 03 07 04 55 31.3200 -97.3300 251.000 30.0 141.096 5.800 -999.990 -999.990 1.411 ..P WKT 2010 10 03 07 09 55 31.3200 -97.3300 251.000 122.0 133.883 5.750 -999.990 -999.990 1.339 ..P WKT 2010 10 03 07 14 55 31.3200 -97.3300 251.000 457.0 120.962 6.000 -999.990 -999.990 1.210 ..P WKT 2010 10 03 07 24 55 31.3200 -97.3300 251.000 30.0 142.867 6.570 -999.990 -999.990 1.429 ..P WKT 2010 10 03 07 29 55 31.3200 -97.3300 251.000 122.0 127.678 5.880 -999.990 -999.990 1.277 ..P WKT 2010 10 03 07 34 55 31.3200 -97.3300 251.000 457.0 106.647 5.260 -999.990 -999.990 1.066 ..P WKT 2010 10 03 07 39 55 31.3200 -97.3300 251.000 30.0 121.627 4.580 -999.990 -999.990 1.216 ..P WKT 2010 10 03 07 44 55 31.3200 -97.3300 251.000 122.0 125.734 4.690 -999.990 -999.990 1.257 ..P WKT 2010 10 03 07 49 55 31.3200 -97.3300 251.000 457.0 104.574 3.870 -999.990 -999.990 1.046 ..P WKT 2010 10 03 07 59 55 31.3200 -97.3300 251.000 30.0 116.263 3.990 -999.990 -999.990 1.163 ..P WKT 2010 10 03 08 04 55 31.3200 -97.3300 251.000 122.0 118.817 5.310 -999.990 -999.990 1.188 ..P WKT 2010 10 03 08 09 55 31.3200 -97.3300 251.000 457.0 110.644 4.460 -999.990 -999.990 1.106 ..P WKT 2010 10 03 08 14 55 31.3200 -97.3300 251.000 30.0 124.468 4.320 -999.990 -999.990 1.245 ..P WKT 2010 10 03 08 19 55 31.3200 -97.3300 251.000 122.0 115.345 4.140 -999.990 -999.990 1.153 ..P WKT 2010 10 03 08 24 55 31.3200 -97.3300 251.000 457.0 111.110 4.240 -999.990 -999.990 1.111 ..P WKT 2010 10 03 08 34 55 31.3200 -97.3300 251.000 30.0 124.867 4.260 -999.990 -999.990 1.249 ..P WKT 2010 10 03 08 39 55 31.3200 -97.3300 251.000 122.0 117.879 4.510 -999.990 -999.990 1.179 ..P WKT 2010 10 03 08 44 55 31.3200 -97.3300 251.000 457.0 117.407 4.160 -999.990 -999.990 1.174 ..P WKT 2010 10 03 08 49 55 31.3200 -97.3300 251.000 30.0 121.007 4.090 -999.990 -999.990 1.210 ..P WKT 2010 10 03 08 54 55 31.3200 -97.3300 251.000 122.0 123.384 4.420 -999.990 -999.990 1.234 ..P WKT 2010 10 03 08 59 55 31.3200 -97.3300 251.000 457.0 119.519 4.050 -999.990 -999.990 1.195 ..P WKT 2010 10 03 09 09 55 31.3200 -97.3300 251.000 30.0 115.843 3.830 -999.990 -999.990 1.158 ..P WKT 2010 10 03 09 14 55 31.3200 -97.3300 251.000 122.0 113.046 4.010 -999.990 -999.990 1.130 ..P WKT 2010 10 03 09 19 55 31.3200 -97.3300 251.000 457.0 116.217 5.450 -999.990 -999.990 1.162 ..P WKT 2010 10 03 09 24 55 31.3200 -97.3300 251.000 30.0 116.947 4.260 -999.990 -999.990 1.169 ..P WKT 2010 10 03 09 29 55 31.3200 -97.3300 251.000 122.0 106.556 4.420 -999.990 -999.990 1.066 ..P WKT 2010 10 03 09 34 55 31.3200 -97.3300 251.000 457.0 114.610 4.750 -999.990 -999.990 1.146 ..P WKT 2010 10 03 09 44 55 31.3200 -97.3300 251.000 30.0 102.665 5.260 -999.990 -999.990 1.027 ..P WKT 2010 10 03 09 49 55 31.3200 -97.3300 251.000 122.0 113.584 4.330 -999.990 -999.990 1.136 ..P WKT 2010 10 03 09 54 55 31.3200 -97.3300 251.000 457.0 117.180 4.260 -999.990 -999.990 1.172 ..P WKT 2010 10 03 09 59 55 31.3200 -97.3300 251.000 30.0 113.997 4.170 -999.990 -999.990 1.140 ..P WKT 2010 10 03 10 04 55 31.3200 -97.3300 251.000 122.0 110.815 4.140 -999.990 -999.990 1.108 ..P WKT 2010 10 03 10 09 55 31.3200 -97.3300 251.000 457.0 113.055 4.030 -999.990 -999.990 1.131 ..P WKT 2010 10 03 10 19 55 31.3200 -97.3300 251.000 30.0 109.404 4.040 -999.990 -999.990 1.094 ..P WKT 2010 10 03 10 24 55 31.3200 -97.3300 251.000 122.0 105.682 3.600 -999.990 -999.990 1.057 ..P WKT 2010 10 03 10 29 55 31.3200 -97.3300 251.000 457.0 106.838 3.900 -999.990 -999.990 1.068 ..P WKT 2010 10 03 10 34 55 31.3200 -97.3300 251.000 30.0 100.948 4.200 -999.990 -999.990 1.009 ..P WKT 2010 10 03 10 39 55 31.3200 -97.3300 251.000 122.0 115.108 5.100 -999.990 -999.990 1.151 ..P WKT 2010 10 03 10 44 55 31.3200 -97.3300 251.000 457.0 114.638 4.020 -999.990 -999.990 1.146 ..P WKT 2010 10 03 10 54 55 31.3200 -97.3300 251.000 30.0 112.652 4.080 -999.990 -999.990 1.127 ..P WKT 2010 10 03 10 59 55 31.3200 -97.3300 251.000 122.0 116.012 4.080 -999.990 -999.990 1.160 ..P WKT 2010 10 03 11 04 55 31.3200 -97.3300 251.000 457.0 115.038 4.350 -999.990 -999.990 1.150 ..P WKT 2010 10 03 11 09 55 31.3200 -97.3300 251.000 30.0 111.086 4.260 -999.990 -999.990 1.111 ..P WKT 2010 10 03 11 14 55 31.3200 -97.3300 251.000 122.0 111.738 4.120 -999.990 -999.990 1.117 ..P WKT 2010 10 03 11 19 55 31.3200 -97.3300 251.000 457.0 117.533 4.450 -999.990 -999.990 1.175 ..P WKT 2010 10 03 11 29 55 31.3200 -97.3300 251.000 30.0 115.538 3.940 -999.990 -999.990 1.155 ..P WKT 2010 10 03 11 34 55 31.3200 -97.3300 251.000 122.0 111.133 4.500 -999.990 -999.990 1.111 ..P WKT 2010 10 03 11 39 55 31.3200 -97.3300 251.000 457.0 118.232 4.060 -999.990 -999.990 1.182 ..P WKT 2010 10 03 11 44 55 31.3200 -97.3300 251.000 30.0 111.122 4.180 -999.990 -999.990 1.111 ..P WKT 2010 10 03 11 49 55 31.3200 -97.3300 251.000 122.0 116.731 3.770 -999.990 -999.990 1.167 ..P WKT 2010 10 03 12 09 55 31.3200 -97.3300 251.000 457.0 121.118 4.430 -999.990 -999.990 1.211 ..P WKT 2010 10 03 12 10 25 31.3200 -97.3300 251.000 457.0 111.494 4.000 -999.990 -999.990 1.115 ..P WKT 2010 10 03 12 10 55 31.3200 -97.3300 251.000 457.0 109.177 4.120 -999.990 -999.990 1.092 ..P WKT 2010 10 03 12 11 25 31.3200 -97.3300 251.000 457.0 116.331 3.820 -999.990 -999.990 1.163 ..P WKT 2010 10 03 12 11 55 31.3200 -97.3300 251.000 457.0 115.502 4.010 -999.990 -999.990 1.155 ..P WKT 2010 10 03 12 12 25 31.3200 -97.3300 251.000 457.0 115.484 4.250 -999.990 -999.990 1.155 ..P WKT 2010 10 03 12 12 55 31.3200 -97.3300 251.000 457.0 117.497 4.380 -999.990 -999.990 1.175 ..P WKT 2010 10 03 12 13 25 31.3200 -97.3300 251.000 457.0 114.638 4.150 -999.990 -999.990 1.146 ..P WKT 2010 10 03 12 13 55 31.3200 -97.3300 251.000 457.0 118.274 3.850 -999.990 -999.990 1.183 ..P WKT 2010 10 03 12 14 25 31.3200 -97.3300 251.000 457.0 115.822 3.780 -999.990 -999.990 1.158 ..P WKT 2010 10 03 12 14 55 31.3200 -97.3300 251.000 457.0 121.894 4.270 -999.990 -999.990 1.219 ..P WKT 2010 10 03 12 19 55 31.3200 -97.3300 251.000 30.0 115.497 3.690 -999.990 -999.990 1.155 ..P WKT 2010 10 03 12 24 55 31.3200 -97.3300 251.000 122.0 120.468 4.130 -999.990 -999.990 1.205 ..P WKT 2010 10 03 12 29 55 31.3200 -97.3300 251.000 457.0 115.694 4.650 -999.990 -999.990 1.157 ..P WKT 2010 10 03 12 34 55 31.3200 -97.3300 251.000 30.0 114.440 3.540 -999.990 -999.990 1.144 ..P WKT 2010 10 03 12 39 55 31.3200 -97.3300 251.000 122.0 114.132 3.670 -999.990 -999.990 1.141 ..P WKT 2010 10 03 12 44 55 31.3200 -97.3300 251.000 457.0 117.885 3.660 -999.990 -999.990 1.179 ..P WKT 2010 10 03 12 54 55 31.3200 -97.3300 251.000 30.0 117.234 4.390 -999.990 -999.990 1.172 ..P WKT 2010 10 03 12 59 55 31.3200 -97.3300 251.000 122.0 113.776 3.830 -999.990 -999.990 1.138 ..P WKT 2010 10 03 13 04 55 31.3200 -97.3300 251.000 457.0 115.869 4.150 -999.990 -999.990 1.159 ..P WKT 2010 10 03 13 09 55 31.3200 -97.3300 251.000 30.0 116.067 3.740 -999.990 -999.990 1.161 ..P WKT 2010 10 03 13 14 55 31.3200 -97.3300 251.000 122.0 117.077 3.770 -999.990 -999.990 1.171 ..P WKT 2010 10 03 13 19 55 31.3200 -97.3300 251.000 457.0 114.566 4.250 -999.990 -999.990 1.146 ..P WKT 2010 10 03 13 29 55 31.3200 -97.3300 251.000 30.0 115.677 4.440 -999.990 -999.990 1.157 ..P WKT 2010 10 03 13 34 55 31.3200 -97.3300 251.000 122.0 118.759 4.520 -999.990 -999.990 1.188 ..P WKT 2010 10 03 13 39 55 31.3200 -97.3300 251.000 457.0 119.130 4.190 -999.990 -999.990 1.191 ..P WKT 2010 10 03 13 44 55 31.3200 -97.3300 251.000 30.0 121.400 3.950 -999.990 -999.990 1.214 ..P WKT 2010 10 03 13 49 55 31.3200 -97.3300 251.000 122.0 117.978 3.680 -999.990 -999.990 1.180 ..P WKT 2010 10 03 13 54 55 31.3200 -97.3300 251.000 457.0 117.808 3.880 -999.990 -999.990 1.178 ..P WKT 2010 10 03 14 04 55 31.3200 -97.3300 251.000 30.0 108.445 3.570 -999.990 -999.990 1.084 ..P WKT 2010 10 03 14 09 55 31.3200 -97.3300 251.000 122.0 118.228 3.730 -999.990 -999.990 1.182 ..P WKT 2010 10 03 14 14 55 31.3200 -97.3300 251.000 457.0 121.234 3.640 -999.990 -999.990 1.212 ..P WKT 2010 10 03 14 19 55 31.3200 -97.3300 251.000 30.0 123.156 5.440 -999.990 -999.990 1.232 ..P WKT 2010 10 03 14 24 55 31.3200 -97.3300 251.000 122.0 121.824 3.960 -999.990 -999.990 1.218 ..P WKT 2010 10 03 14 29 55 31.3200 -97.3300 251.000 457.0 116.966 3.680 -999.990 -999.990 1.170 ..P WKT 2010 10 03 14 39 55 31.3200 -97.3300 251.000 30.0 125.616 3.720 -999.990 -999.990 1.256 ..P WKT 2010 10 03 14 44 55 31.3200 -97.3300 251.000 122.0 120.951 3.800 -999.990 -999.990 1.210 ..P WKT 2010 10 03 14 49 55 31.3200 -97.3300 251.000 457.0 123.068 4.880 -999.990 -999.990 1.231 ..P WKT 2010 10 03 14 54 55 31.3200 -97.3300 251.000 30.0 120.030 3.710 -999.990 -999.990 1.200 ..P WKT 2010 10 03 14 59 55 31.3200 -97.3300 251.000 122.0 120.791 3.890 -999.990 -999.990 1.208 ..P WKT 2010 10 03 15 04 55 31.3200 -97.3300 251.000 457.0 117.617 4.960 -999.990 -999.990 1.176 ..P WKT 2010 10 03 15 14 55 31.3200 -97.3300 251.000 30.0 111.402 3.710 -999.990 -999.990 1.114 ..P WKT 2010 10 03 15 19 55 31.3200 -97.3300 251.000 122.0 117.319 3.790 -999.990 -999.990 1.173 ..P WKT 2010 10 03 15 24 55 31.3200 -97.3300 251.000 457.0 113.330 4.570 -999.990 -999.990 1.133 ..P WKT 2010 10 03 15 29 55 31.3200 -97.3300 251.000 30.0 117.347 3.570 -999.990 -999.990 1.173 ..P WKT 2010 10 03 15 34 55 31.3200 -97.3300 251.000 122.0 109.827 3.320 -999.990 -999.990 1.098 ..P WKT 2010 10 03 15 39 55 31.3200 -97.3300 251.000 457.0 108.008 3.150 -999.990 -999.990 1.080 ..P WKT 2010 10 03 15 49 55 31.3200 -97.3300 251.000 30.0 114.144 3.300 -999.990 -999.990 1.141 ..P WKT 2010 10 03 15 54 55 31.3200 -97.3300 251.000 122.0 115.584 3.200 -999.990 -999.990 1.156 ..P WKT 2010 10 03 15 59 55 31.3200 -97.3300 251.000 457.0 106.161 3.430 -999.990 -999.990 1.062 ..P WKT 2010 10 03 16 04 55 31.3200 -97.3300 251.000 30.0 107.328 3.850 -999.990 -999.990 1.073 ..P WKT 2010 10 03 16 09 55 31.3200 -97.3300 251.000 122.0 119.903 3.380 -999.990 -999.990 1.199 ..P WKT 2010 10 03 16 14 55 31.3200 -97.3300 251.000 457.0 113.602 4.610 -999.990 -999.990 1.136 ..P WKT 2010 10 03 16 24 55 31.3200 -97.3300 251.000 30.0 115.531 3.660 -999.990 -999.990 1.155 ..P WKT 2010 10 03 16 29 55 31.3200 -97.3300 251.000 122.0 114.526 3.290 -999.990 -999.990 1.145 ..P WKT 2010 10 03 16 34 55 31.3200 -97.3300 251.000 457.0 110.940 3.690 -999.990 -999.990 1.109 ..P WKT 2010 10 03 16 39 55 31.3200 -97.3300 251.000 30.0 115.369 4.510 -999.990 -999.990 1.154 ..P WKT 2010 10 03 16 44 55 31.3200 -97.3300 251.000 122.0 108.929 4.560 -999.990 -999.990 1.089 ..P WKT 2010 10 03 16 49 55 31.3200 -97.3300 251.000 457.0 115.261 3.340 -999.990 -999.990 1.153 ..P WKT 2010 10 03 17 04 55 31.3200 -97.3300 251.000 30.0 115.661 3.970 -999.990 -999.990 1.157 ..P WKT 2010 10 03 17 09 55 31.3200 -97.3300 251.000 122.0 113.579 4.550 -999.990 -999.990 1.136 ..P WKT 2010 10 03 17 14 55 31.3200 -97.3300 251.000 457.0 115.573 5.180 -999.990 -999.990 1.156 ..P WKT 2010 10 03 17 19 55 31.3200 -97.3300 251.000 30.0 117.024 3.470 -999.990 -999.990 1.170 ..P WKT 2010 10 03 17 24 55 31.3200 -97.3300 251.000 122.0 116.028 3.700 -999.990 -999.990 1.160 ..P WKT 2010 10 03 17 29 55 31.3200 -97.3300 251.000 457.0 121.287 4.220 -999.990 -999.990 1.213 ..P WKT 2010 10 03 17 39 55 31.3200 -97.3300 251.000 30.0 123.928 3.700 -999.990 -999.990 1.239 ..P WKT 2010 10 03 17 44 55 31.3200 -97.3300 251.000 122.0 121.310 3.810 -999.990 -999.990 1.213 ..P WKT 2010 10 03 17 49 55 31.3200 -97.3300 251.000 457.0 121.411 4.640 -999.990 -999.990 1.214 ..P WKT 2010 10 03 17 54 55 31.3200 -97.3300 251.000 30.0 116.889 3.830 -999.990 -999.990 1.169 ..P WKT 2010 10 03 17 59 55 31.3200 -97.3300 251.000 122.0 121.071 3.930 -999.990 -999.990 1.211 ..P WKT 2010 10 03 18 04 55 31.3200 -97.3300 251.000 457.0 120.901 3.890 -999.990 -999.990 1.209 ..P WKT 2010 10 03 18 14 55 31.3200 -97.3300 251.000 30.0 122.037 3.440 -999.990 -999.990 1.220 ..P WKT 2010 10 03 18 19 55 31.3200 -97.3300 251.000 122.0 124.161 4.860 -999.990 -999.990 1.242 ..P WKT 2010 10 03 18 24 55 31.3200 -97.3300 251.000 457.0 120.297 3.400 -999.990 -999.990 1.203 ..P WKT 2010 10 03 18 29 55 31.3200 -97.3300 251.000 30.0 121.876 3.330 -999.990 -999.990 1.219 ..P WKT 2010 10 03 18 34 55 31.3200 -97.3300 251.000 122.0 126.178 5.000 -999.990 -999.990 1.262 ..P WKT 2010 10 03 18 39 55 31.3200 -97.3300 251.000 457.0 118.775 3.180 -999.990 -999.990 1.188 ..P WKT 2010 10 03 18 49 55 31.3200 -97.3300 251.000 30.0 124.695 3.500 -999.990 -999.990 1.247 ..P WKT 2010 10 03 18 54 55 31.3200 -97.3300 251.000 122.0 124.544 3.740 -999.990 -999.990 1.245 ..P WKT 2010 10 03 18 59 55 31.3200 -97.3300 251.000 457.0 125.075 4.300 -999.990 -999.990 1.251 ..P WKT 2010 10 03 19 04 55 31.3200 -97.3300 251.000 30.0 120.295 5.930 -999.990 -999.990 1.203 ..P WKT 2010 10 03 19 09 55 31.3200 -97.3300 251.000 122.0 124.637 4.840 -999.990 -999.990 1.246 ..P WKT 2010 10 03 19 14 55 31.3200 -97.3300 251.000 457.0 120.265 4.870 -999.990 -999.990 1.203 ..P WKT 2010 10 03 19 24 55 31.3200 -97.3300 251.000 30.0 122.745 3.510 -999.990 -999.990 1.227 ..P WKT 2010 10 03 19 29 55 31.3200 -97.3300 251.000 122.0 121.699 5.160 -999.990 -999.990 1.217 ..P WKT 2010 10 03 19 34 55 31.3200 -97.3300 251.000 457.0 119.290 5.090 -999.990 -999.990 1.193 ..P WKT 2010 10 03 19 39 55 31.3200 -97.3300 251.000 30.0 115.111 4.950 -999.990 -999.990 1.151 ..P WKT 2010 10 03 19 44 55 31.3200 -97.3300 251.000 122.0 121.966 4.970 -999.990 -999.990 1.220 ..P WKT 2010 10 03 19 49 55 31.3200 -97.3300 251.000 457.0 113.153 4.400 -999.990 -999.990 1.132 ..P WKT 2010 10 03 19 59 55 31.3200 -97.3300 251.000 30.0 109.404 4.530 -999.990 -999.990 1.094 ..P WKT 2010 10 03 20 04 55 31.3200 -97.3300 251.000 122.0 116.378 4.460 -999.990 -999.990 1.164 ..P WKT 2010 10 03 20 09 55 31.3200 -97.3300 251.000 457.0 114.903 5.170 -999.990 -999.990 1.149 ..P WKT 2010 10 03 20 14 55 31.3200 -97.3300 251.000 30.0 117.516 4.100 -999.990 -999.990 1.175 ..P WKT 2010 10 03 20 19 55 31.3200 -97.3300 251.000 122.0 121.220 3.530 -999.990 -999.990 1.212 ..P WKT 2010 10 03 20 24 55 31.3200 -97.3300 251.000 457.0 120.426 4.460 -999.990 -999.990 1.204 ..P WKT 2010 10 03 20 34 55 31.3200 -97.3300 251.000 30.0 113.170 3.070 -999.990 -999.990 1.132 ..P WKT 2010 10 03 20 39 55 31.3200 -97.3300 251.000 122.0 119.388 2.640 -999.990 -999.990 1.194 ..P WKT 2010 10 03 20 44 55 31.3200 -97.3300 251.000 457.0 118.107 3.230 -999.990 -999.990 1.181 ..P WKT 2010 10 03 20 49 55 31.3200 -97.3300 251.000 30.0 121.053 3.290 -999.990 -999.990 1.211 ..P WKT 2010 10 03 20 54 55 31.3200 -97.3300 251.000 122.0 121.409 3.890 -999.990 -999.990 1.214 ..P WKT 2010 10 03 20 59 55 31.3200 -97.3300 251.000 457.0 111.942 2.930 -999.990 -999.990 1.119 ..P WKT 2010 10 03 21 09 55 31.3200 -97.3300 251.000 30.0 117.622 3.020 -999.990 -999.990 1.176 ..P WKT 2010 10 03 21 14 55 31.3200 -97.3300 251.000 122.0 115.853 3.220 -999.990 -999.990 1.159 ..P WKT 2010 10 03 21 19 55 31.3200 -97.3300 251.000 457.0 120.359 3.100 -999.990 -999.990 1.204 ..P WKT 2010 10 03 21 24 55 31.3200 -97.3300 251.000 30.0 118.590 3.980 -999.990 -999.990 1.186 ..P WKT 2010 10 03 21 29 55 31.3200 -97.3300 251.000 122.0 122.552 3.120 -999.990 -999.990 1.226 ..P WKT 2010 10 03 21 34 55 31.3200 -97.3300 251.000 457.0 117.781 3.400 -999.990 -999.990 1.178 ..P WKT 2010 10 03 21 44 55 31.3200 -97.3300 251.000 30.0 123.561 2.740 -999.990 -999.990 1.236 ..P WKT 2010 10 03 21 49 55 31.3200 -97.3300 251.000 122.0 121.830 3.160 -999.990 -999.990 1.218 ..P WKT 2010 10 03 21 54 55 31.3200 -97.3300 251.000 457.0 120.372 3.950 -999.990 -999.990 1.204 ..P WKT 2010 10 03 21 59 55 31.3200 -97.3300 251.000 30.0 118.094 3.740 -999.990 -999.990 1.181 ..P WKT 2010 10 03 22 04 55 31.3200 -97.3300 251.000 122.0 121.006 2.720 -999.990 -999.990 1.210 ..P WKT 2010 10 03 22 09 55 31.3200 -97.3300 251.000 457.0 115.451 2.900 -999.990 -999.990 1.155 ..P WKT 2010 10 03 22 19 55 31.3200 -97.3300 251.000 30.0 112.299 2.530 -999.990 -999.990 1.123 ..P WKT 2010 10 03 22 24 55 31.3200 -97.3300 251.000 122.0 116.887 2.470 -999.990 -999.990 1.169 ..P WKT 2010 10 03 22 29 55 31.3200 -97.3300 251.000 457.0 117.380 2.400 -999.990 -999.990 1.174 ..P WKT 2010 10 03 22 34 55 31.3200 -97.3300 251.000 30.0 118.418 2.300 -999.990 -999.990 1.184 ..P WKT 2010 10 03 22 39 55 31.3200 -97.3300 251.000 122.0 116.725 2.300 -999.990 -999.990 1.167 ..P WKT 2010 10 03 22 44 55 31.3200 -97.3300 251.000 457.0 112.846 2.560 -999.990 -999.990 1.128 ..P WKT 2010 10 03 22 54 55 31.3200 -97.3300 251.000 30.0 117.754 2.330 -999.990 -999.990 1.178 ..P WKT 2010 10 03 22 59 55 31.3200 -97.3300 251.000 122.0 116.294 2.290 -999.990 -999.990 1.163 ..P WKT 2010 10 03 23 04 55 31.3200 -97.3300 251.000 457.0 116.474 4.330 -999.990 -999.990 1.165 ..P WKT 2010 10 03 23 09 55 31.3200 -97.3300 251.000 30.0 116.791 3.820 -999.990 -999.990 1.168 ..P WKT 2010 10 03 23 14 55 31.3200 -97.3300 251.000 122.0 114.784 3.740 -999.990 -999.990 1.148 ..P WKT 2010 10 03 23 19 55 31.3200 -97.3300 251.000 457.0 119.474 3.420 -999.990 -999.990 1.195 ..P WKT 2010 10 03 23 29 55 31.3200 -97.3300 251.000 30.0 121.507 2.290 -999.990 -999.990 1.215 ..P WKT 2010 10 03 23 34 55 31.3200 -97.3300 251.000 122.0 119.258 2.770 -999.990 -999.990 1.193 ..P WKT 2010 10 03 23 39 55 31.3200 -97.3300 251.000 457.0 124.803 3.530 -999.990 -999.990 1.248 ..P WKT 2010 10 03 23 44 55 31.3200 -97.3300 251.000 30.0 123.375 2.770 -999.990 -999.990 1.234 ..P WKT 2010 10 03 23 49 55 31.3200 -97.3300 251.000 122.0 124.134 2.530 -999.990 -999.990 1.241 ..P WKT 2010 10 04 00 09 55 31.3200 -97.3300 251.000 457.0 121.141 2.890 -999.990 -999.990 1.211 ..P WKT 2010 10 04 00 10 25 31.3200 -97.3300 251.000 457.0 123.974 2.760 -999.990 -999.990 1.240 ..P WKT 2010 10 04 00 10 55 31.3200 -97.3300 251.000 457.0 121.747 3.000 -999.990 -999.990 1.217 ..P WKT 2010 10 04 00 11 25 31.3200 -97.3300 251.000 457.0 116.785 2.660 -999.990 -999.990 1.168 ..P WKT 2010 10 04 00 11 55 31.3200 -97.3300 251.000 457.0 117.294 2.530 -999.990 -999.990 1.173 ..P WKT 2010 10 04 00 12 25 31.3200 -97.3300 251.000 457.0 120.128 2.830 -999.990 -999.990 1.201 ..P WKT 2010 10 04 00 12 55 31.3200 -97.3300 251.000 457.0 120.500 3.280 -999.990 -999.990 1.205 ..P WKT 2010 10 04 00 13 25 31.3200 -97.3300 251.000 457.0 119.231 2.500 -999.990 -999.990 1.192 ..P WKT 2010 10 04 00 13 55 31.3200 -97.3300 251.000 457.0 123.021 3.260 -999.990 -999.990 1.230 ..P WKT 2010 10 04 00 14 25 31.3200 -97.3300 251.000 457.0 116.828 3.520 -999.990 -999.990 1.168 ..P WKT 2010 10 04 00 14 55 31.3200 -97.3300 251.000 457.0 123.492 4.950 -999.990 -999.990 1.235 ..P WKT 2010 10 04 00 19 55 31.3200 -97.3300 251.000 30.0 120.099 2.580 -999.990 -999.990 1.201 ..P WKT 2010 10 04 00 24 55 31.3200 -97.3300 251.000 122.0 113.561 2.640 -999.990 -999.990 1.136 ..P WKT 2010 10 04 00 29 55 31.3200 -97.3300 251.000 457.0 115.914 4.590 -999.990 -999.990 1.159 ..P WKT 2010 10 04 00 34 55 31.3200 -97.3300 251.000 30.0 119.633 4.490 -999.990 -999.990 1.196 ..P WKT 2010 10 04 00 39 55 31.3200 -97.3300 251.000 122.0 125.676 3.520 -999.990 -999.990 1.257 ..P WKT 2010 10 04 00 44 55 31.3200 -97.3300 251.000 457.0 120.507 3.880 -999.990 -999.990 1.205 ..P WKT 2010 10 04 00 54 55 31.3200 -97.3300 251.000 30.0 124.777 3.090 -999.990 -999.990 1.248 ..P WKT 2010 10 04 00 59 55 31.3200 -97.3300 251.000 122.0 130.524 3.810 -999.990 -999.990 1.305 ..P WKT 2010 10 04 01 04 55 31.3200 -97.3300 251.000 457.0 124.513 3.400 -999.990 -999.990 1.245 ..P WKT 2010 10 04 01 09 55 31.3200 -97.3300 251.000 30.0 130.807 4.010 -999.990 -999.990 1.308 ..P WKT 2010 10 04 01 14 55 31.3200 -97.3300 251.000 122.0 136.007 3.640 -999.990 -999.990 1.360 ..P WKT 2010 10 04 01 19 55 31.3200 -97.3300 251.000 457.0 128.629 3.660 -999.990 -999.990 1.286 ..P WKT 2010 10 04 01 29 55 31.3200 -97.3300 251.000 30.0 137.700 3.240 -999.990 -999.990 1.377 ..P WKT 2010 10 04 01 34 55 31.3200 -97.3300 251.000 122.0 135.009 3.200 -999.990 -999.990 1.350 ..P WKT 2010 10 04 01 39 55 31.3200 -97.3300 251.000 457.0 116.462 2.910 -999.990 -999.990 1.165 ..P WKT 2010 10 04 01 44 55 31.3200 -97.3300 251.000 30.0 137.283 3.410 -999.990 -999.990 1.373 ..P WKT 2010 10 04 01 49 55 31.3200 -97.3300 251.000 122.0 139.241 2.840 -999.990 -999.990 1.392 ..P WKT 2010 10 04 01 54 55 31.3200 -97.3300 251.000 457.0 113.587 4.050 -999.990 -999.990 1.136 ..P WKT 2010 10 04 02 04 55 31.3200 -97.3300 251.000 30.0 138.004 3.690 -999.990 -999.990 1.380 ..P WKT 2010 10 04 02 09 55 31.3200 -97.3300 251.000 122.0 125.474 2.760 -999.990 -999.990 1.255 ..P WKT 2010 10 04 02 14 55 31.3200 -97.3300 251.000 457.0 114.311 3.110 -999.990 -999.990 1.143 ..P WKT 2010 10 04 02 19 55 31.3200 -97.3300 251.000 30.0 139.501 3.320 -999.990 -999.990 1.395 ..P WKT 2010 10 04 02 24 55 31.3200 -97.3300 251.000 122.0 120.140 3.530 -999.990 -999.990 1.201 ..P WKT 2010 10 04 02 29 55 31.3200 -97.3300 251.000 457.0 118.544 3.310 -999.990 -999.990 1.185 ..P WKT 2010 10 04 02 39 55 31.3200 -97.3300 251.000 30.0 142.134 3.400 -999.990 -999.990 1.421 ..P WKT 2010 10 04 02 44 55 31.3200 -97.3300 251.000 122.0 130.427 3.990 -999.990 -999.990 1.304 ..P WKT 2010 10 04 02 49 55 31.3200 -97.3300 251.000 457.0 123.775 3.830 -999.990 -999.990 1.238 ..P WKT 2010 10 04 02 54 55 31.3200 -97.3300 251.000 30.0 133.110 3.360 -999.990 -999.990 1.331 ..P WKT 2010 10 04 02 59 55 31.3200 -97.3300 251.000 122.0 124.547 3.710 -999.990 -999.990 1.245 ..P WKT 2010 10 04 03 04 55 31.3200 -97.3300 251.000 457.0 118.852 3.390 -999.990 -999.990 1.189 ..P WKT 2010 10 04 03 14 55 31.3200 -97.3300 251.000 30.0 133.617 3.230 -999.990 -999.990 1.336 ..P WKT 2010 10 04 03 19 55 31.3200 -97.3300 251.000 122.0 113.774 3.620 -999.990 -999.990 1.138 ..P WKT 2010 10 04 03 24 55 31.3200 -97.3300 251.000 457.0 108.276 4.310 -999.990 -999.990 1.083 ..P WKT 2010 10 04 03 29 55 31.3200 -97.3300 251.000 30.0 123.268 4.730 -999.990 -999.990 1.233 ..P WKT 2010 10 04 03 34 55 31.3200 -97.3300 251.000 122.0 120.092 4.080 -999.990 -999.990 1.201 ..P WKT 2010 10 04 03 39 55 31.3200 -97.3300 251.000 457.0 107.219 3.810 -999.990 -999.990 1.072 ..P WKT 2010 10 04 03 49 55 31.3200 -97.3300 251.000 30.0 131.775 3.530 -999.990 -999.990 1.318 ..P WKT 2010 10 04 03 54 55 31.3200 -97.3300 251.000 122.0 120.444 4.350 -999.990 -999.990 1.204 ..P WKT 2010 10 04 03 59 55 31.3200 -97.3300 251.000 457.0 111.026 5.110 -999.990 -999.990 1.110 ..P WKT 2010 10 04 04 04 55 31.3200 -97.3300 251.000 30.0 130.150 5.330 -999.990 -999.990 1.302 ..P WKT 2010 10 04 04 09 55 31.3200 -97.3300 251.000 122.0 118.274 4.730 -999.990 -999.990 1.183 ..P WKT 2010 10 04 04 14 55 31.3200 -97.3300 251.000 457.0 117.733 4.770 -999.990 -999.990 1.177 ..P WKT 2010 10 04 04 24 55 31.3200 -97.3300 251.000 30.0 135.748 4.550 -999.990 -999.990 1.357 ..P WKT 2010 10 04 04 29 55 31.3200 -97.3300 251.000 122.0 109.108 5.130 -999.990 -999.990 1.091 ..P WKT 2010 10 04 04 34 55 31.3200 -97.3300 251.000 457.0 108.275 5.660 -999.990 -999.990 1.083 ..P WKT 2010 10 04 04 39 55 31.3200 -97.3300 251.000 30.0 139.663 6.340 -999.990 -999.990 1.397 ..P WKT 2010 10 04 04 44 55 31.3200 -97.3300 251.000 122.0 112.616 5.750 -999.990 -999.990 1.126 ..P WKT 2010 10 04 04 49 55 31.3200 -97.3300 251.000 457.0 108.233 4.050 -999.990 -999.990 1.082 ..P WKT 2010 10 04 05 04 55 31.3200 -97.3300 251.000 30.0 130.129 5.160 -999.990 -999.990 1.301 ..P WKT 2010 10 04 05 09 55 31.3200 -97.3300 251.000 122.0 118.356 6.250 -999.990 -999.990 1.184 ..P WKT 2010 10 04 05 14 55 31.3200 -97.3300 251.000 457.0 107.675 6.510 -999.990 -999.990 1.077 ..P WKT 2010 10 04 05 19 55 31.3200 -97.3300 251.000 30.0 134.394 5.480 -999.990 -999.990 1.344 ..P WKT 2010 10 04 05 24 55 31.3200 -97.3300 251.000 122.0 120.165 4.830 -999.990 -999.990 1.202 ..P WKT 2010 10 04 05 29 55 31.3200 -97.3300 251.000 457.0 106.756 5.220 -999.990 -999.990 1.068 ..P WKT 2010 10 04 05 39 55 31.3200 -97.3300 251.000 30.0 135.816 5.270 -999.990 -999.990 1.358 ..P WKT 2010 10 04 05 44 55 31.3200 -97.3300 251.000 122.0 120.965 5.400 -999.990 -999.990 1.210 ..P WKT 2010 10 04 05 49 55 31.3200 -97.3300 251.000 457.0 102.841 5.770 -999.990 -999.990 1.028 ..P WKT 2010 10 04 05 54 55 31.3200 -97.3300 251.000 30.0 136.843 5.700 -999.990 -999.990 1.368 ..P WKT 2010 10 04 05 59 55 31.3200 -97.3300 251.000 122.0 110.805 5.510 -999.990 -999.990 1.108 ..P WKT 2010 10 04 06 04 55 31.3200 -97.3300 251.000 457.0 104.145 5.480 -999.990 -999.990 1.041 ..P WKT 2010 10 04 06 14 55 31.3200 -97.3300 251.000 30.0 129.007 6.320 -999.990 -999.990 1.290 ..P WKT 2010 10 04 06 19 55 31.3200 -97.3300 251.000 122.0 104.591 4.900 -999.990 -999.990 1.046 ..P WKT 2010 10 04 06 24 55 31.3200 -97.3300 251.000 457.0 105.551 6.600 -999.990 -999.990 1.056 ..P WKT 2010 10 04 06 29 55 31.3200 -97.3300 251.000 30.0 128.066 6.000 -999.990 -999.990 1.281 ..P WKT 2010 10 04 06 34 55 31.3200 -97.3300 251.000 122.0 104.472 4.790 -999.990 -999.990 1.045 ..P WKT 2010 10 04 06 39 55 31.3200 -97.3300 251.000 457.0 109.252 4.940 -999.990 -999.990 1.093 ..P WKT 2010 10 04 06 49 55 31.3200 -97.3300 251.000 30.0 132.587 4.060 -999.990 -999.990 1.326 ..P WKT 2010 10 04 06 54 55 31.3200 -97.3300 251.000 122.0 122.226 5.050 -999.990 -999.990 1.222 ..P WKT 2010 10 04 06 59 55 31.3200 -97.3300 251.000 457.0 118.549 4.460 -999.990 -999.990 1.185 ..P WKT 2010 10 04 07 04 55 31.3200 -97.3300 251.000 30.0 120.600 4.390 -999.990 -999.990 1.206 ..P WKT 2010 10 04 07 09 55 31.3200 -97.3300 251.000 122.0 115.831 4.640 -999.990 -999.990 1.158 ..P WKT 2010 10 04 07 14 55 31.3200 -97.3300 251.000 457.0 114.746 4.560 -999.990 -999.990 1.147 ..P WKT 2010 10 04 07 24 55 31.3200 -97.3300 251.000 30.0 126.211 4.590 -999.990 -999.990 1.262 ..P WKT 2010 10 04 07 29 55 31.3200 -97.3300 251.000 122.0 110.944 4.930 -999.990 -999.990 1.109 ..P WKT 2010 10 04 07 34 55 31.3200 -97.3300 251.000 457.0 123.221 5.170 -999.990 -999.990 1.232 ..P WKT 2010 10 04 07 39 55 31.3200 -97.3300 251.000 30.0 126.771 5.540 -999.990 -999.990 1.268 ..P WKT 2010 10 04 07 44 55 31.3200 -97.3300 251.000 122.0 116.414 4.790 -999.990 -999.990 1.164 ..P WKT 2010 10 04 07 49 55 31.3200 -97.3300 251.000 457.0 112.057 5.200 -999.990 -999.990 1.121 ..P WKT 2010 10 04 07 59 55 31.3200 -97.3300 251.000 30.0 129.615 6.350 -999.990 -999.990 1.296 ..P WKT 2010 10 04 08 04 55 31.3200 -97.3300 251.000 122.0 111.722 5.580 -999.990 -999.990 1.117 ..P WKT 2010 10 04 08 09 55 31.3200 -97.3300 251.000 457.0 108.418 5.330 -999.990 -999.990 1.084 ..P WKT 2010 10 04 08 14 55 31.3200 -97.3300 251.000 30.0 128.967 5.130 -999.990 -999.990 1.290 ..P WKT 2010 10 04 08 19 55 31.3200 -97.3300 251.000 122.0 116.665 5.370 -999.990 -999.990 1.167 ..P WKT 2010 10 04 08 24 55 31.3200 -97.3300 251.000 457.0 101.230 5.600 -999.990 -999.990 1.012 ..P WKT 2010 10 04 08 34 55 31.3200 -97.3300 251.000 30.0 118.317 4.980 -999.990 -999.990 1.183 ..P WKT 2010 10 04 08 39 55 31.3200 -97.3300 251.000 122.0 114.993 4.940 -999.990 -999.990 1.150 ..P WKT 2010 10 04 08 44 55 31.3200 -97.3300 251.000 457.0 107.990 5.380 -999.990 -999.990 1.080 ..P WKT 2010 10 04 08 49 55 31.3200 -97.3300 251.000 30.0 125.516 4.930 -999.990 -999.990 1.255 ..P WKT 2010 10 04 08 54 55 31.3200 -97.3300 251.000 122.0 119.876 5.360 -999.990 -999.990 1.199 ..P WKT 2010 10 04 08 59 55 31.3200 -97.3300 251.000 457.0 104.971 4.780 -999.990 -999.990 1.050 ..P WKT 2010 10 04 09 09 55 31.3200 -97.3300 251.000 30.0 117.050 4.970 -999.990 -999.990 1.171 ..P WKT 2010 10 04 09 14 55 31.3200 -97.3300 251.000 122.0 105.884 4.820 -999.990 -999.990 1.059 ..P WKT 2010 10 04 09 19 55 31.3200 -97.3300 251.000 457.0 101.802 4.930 -999.990 -999.990 1.018 ..P WKT 2010 10 04 09 24 55 31.3200 -97.3300 251.000 30.0 115.431 5.400 -999.990 -999.990 1.154 ..P WKT 2010 10 04 09 29 55 31.3200 -97.3300 251.000 122.0 104.266 5.900 -999.990 -999.990 1.043 ..P WKT 2010 10 04 09 34 55 31.3200 -97.3300 251.000 457.0 103.455 5.160 -999.990 -999.990 1.035 ..P WKT 2010 10 04 09 44 55 31.3200 -97.3300 251.000 30.0 114.908 5.150 -999.990 -999.990 1.149 ..P WKT 2010 10 04 09 49 55 31.3200 -97.3300 251.000 122.0 110.282 5.180 -999.990 -999.990 1.103 ..P WKT 2010 10 04 09 54 55 31.3200 -97.3300 251.000 457.0 109.199 6.030 -999.990 -999.990 1.092 ..P WKT 2010 10 04 09 59 55 31.3200 -97.3300 251.000 30.0 119.555 6.340 -999.990 -999.990 1.196 ..P WKT 2010 10 04 10 04 55 31.3200 -97.3300 251.000 122.0 111.389 5.920 -999.990 -999.990 1.114 ..P WKT 2010 10 04 10 09 55 31.3200 -97.3300 251.000 457.0 106.765 5.450 -999.990 -999.990 1.068 ..P WKT 2010 10 04 10 19 55 31.3200 -97.3300 251.000 30.0 114.830 6.020 -999.990 -999.990 1.148 ..P WKT 2010 10 04 10 24 55 31.3200 -97.3300 251.000 122.0 112.539 6.370 -999.990 -999.990 1.125 ..P WKT 2010 10 04 10 29 55 31.3200 -97.3300 251.000 457.0 105.893 6.770 -999.990 -999.990 1.059 ..P WKT 2010 10 04 10 34 55 31.3200 -97.3300 251.000 30.0 120.486 6.320 -999.990 -999.990 1.205 ..P WKT 2010 10 04 10 39 55 31.3200 -97.3300 251.000 122.0 121.056 6.160 -999.990 -999.990 1.211 ..P WKT 2010 10 04 10 44 55 31.3200 -97.3300 251.000 457.0 113.321 5.510 -999.990 -999.990 1.133 ..P WKT 2010 10 04 10 54 55 31.3200 -97.3300 251.000 30.0 117.376 5.500 -999.990 -999.990 1.174 ..P WKT 2010 10 04 10 59 55 31.3200 -97.3300 251.000 122.0 105.889 6.430 -999.990 -999.990 1.059 ..P WKT 2010 10 04 11 04 55 31.3200 -97.3300 251.000 457.0 105.837 6.490 -999.990 -999.990 1.058 ..P WKT 2010 10 04 11 09 55 31.3200 -97.3300 251.000 30.0 111.365 5.600 -999.990 -999.990 1.114 ..P WKT 2010 10 04 11 14 55 31.3200 -97.3300 251.000 122.0 115.668 6.010 -999.990 -999.990 1.157 ..P WKT 2010 10 04 11 19 55 31.3200 -97.3300 251.000 457.0 105.272 5.680 -999.990 -999.990 1.053 ..P WKT 2010 10 04 11 29 55 31.3200 -97.3300 251.000 30.0 121.346 5.630 -999.990 -999.990 1.213 ..P WKT 2010 10 04 11 34 55 31.3200 -97.3300 251.000 122.0 143.596 5.780 -999.990 -999.990 1.436 ..P WKT 2010 10 04 11 39 55 31.3200 -97.3300 251.000 457.0 111.006 6.130 -999.990 -999.990 1.110 ..P WKT 2010 10 04 11 44 55 31.3200 -97.3300 251.000 30.0 126.314 6.430 -999.990 -999.990 1.263 ..P WKT 2010 10 04 11 49 55 31.3200 -97.3300 251.000 122.0 126.110 6.370 -999.990 -999.990 1.261 ..P WKT 2010 10 04 12 09 55 31.3200 -97.3300 251.000 457.0 128.823 5.680 -999.990 -999.990 1.288 ..P WKT 2010 10 04 12 10 25 31.3200 -97.3300 251.000 457.0 129.025 5.870 -999.990 -999.990 1.290 ..P WKT 2010 10 04 12 10 55 31.3200 -97.3300 251.000 457.0 125.417 5.720 -999.990 -999.990 1.254 ..P WKT 2010 10 04 12 11 25 31.3200 -97.3300 251.000 457.0 125.076 5.710 -999.990 -999.990 1.251 ..P WKT 2010 10 04 12 11 55 31.3200 -97.3300 251.000 457.0 123.917 5.790 -999.990 -999.990 1.239 ..P WKT 2010 10 04 12 12 25 31.3200 -97.3300 251.000 457.0 121.670 5.810 -999.990 -999.990 1.217 ..P WKT 2010 10 04 12 12 55 31.3200 -97.3300 251.000 457.0 123.097 5.910 -999.990 -999.990 1.231 ..P WKT 2010 10 04 12 13 25 31.3200 -97.3300 251.000 457.0 119.625 5.890 -999.990 -999.990 1.196 ..P WKT 2010 10 04 12 13 55 31.3200 -97.3300 251.000 457.0 119.691 5.890 -999.990 -999.990 1.197 ..P WKT 2010 10 04 12 14 25 31.3200 -97.3300 251.000 457.0 116.492 6.160 -999.990 -999.990 1.165 ..P WKT 2010 10 04 12 14 55 31.3200 -97.3300 251.000 457.0 120.912 6.100 -999.990 -999.990 1.209 ..P WKT 2010 10 04 12 19 55 31.3200 -97.3300 251.000 30.0 128.103 6.120 -999.990 -999.990 1.281 ..P WKT 2010 10 04 12 24 55 31.3200 -97.3300 251.000 122.0 124.138 6.340 -999.990 -999.990 1.241 ..P WKT 2010 10 04 12 29 55 31.3200 -97.3300 251.000 457.0 115.682 6.530 -999.990 -999.990 1.157 ..P WKT 2010 10 04 12 34 55 31.3200 -97.3300 251.000 30.0 129.813 6.110 -999.990 -999.990 1.298 ..P WKT 2010 10 04 12 39 55 31.3200 -97.3300 251.000 122.0 124.759 5.850 -999.990 -999.990 1.248 ..P WKT 2010 10 04 12 44 55 31.3200 -97.3300 251.000 457.0 105.009 5.580 -999.990 -999.990 1.050 ..P WKT 2010 10 04 12 54 55 31.3200 -97.3300 251.000 30.0 127.568 5.620 -999.990 -999.990 1.276 ..P WKT 2010 10 04 12 59 55 31.3200 -97.3300 251.000 122.0 115.448 6.220 -999.990 -999.990 1.154 ..P WKT 2010 10 04 13 04 55 31.3200 -97.3300 251.000 457.0 108.771 6.240 -999.990 -999.990 1.088 ..P WKT 2010 10 04 13 09 55 31.3200 -97.3300 251.000 30.0 134.210 6.050 -999.990 -999.990 1.342 ..P WKT 2010 10 04 13 14 55 31.3200 -97.3300 251.000 122.0 122.906 6.050 -999.990 -999.990 1.229 ..P WKT 2010 10 04 13 19 55 31.3200 -97.3300 251.000 457.0 100.987 5.540 -999.990 -999.990 1.010 ..P WKT 2010 10 04 13 29 55 31.3200 -97.3300 251.000 30.0 128.498 5.760 -999.990 -999.990 1.285 ..P WKT 2010 10 04 13 34 55 31.3200 -97.3300 251.000 122.0 119.954 5.770 -999.990 -999.990 1.200 ..P WKT 2010 10 04 13 39 55 31.3200 -97.3300 251.000 457.0 109.777 6.250 -999.990 -999.990 1.098 ..P WKT 2010 10 04 13 44 55 31.3200 -97.3300 251.000 30.0 136.891 5.730 -999.990 -999.990 1.369 ..P WKT 2010 10 04 13 49 55 31.3200 -97.3300 251.000 122.0 132.429 5.760 -999.990 -999.990 1.324 ..P WKT 2010 10 04 13 54 55 31.3200 -97.3300 251.000 457.0 111.634 6.220 -999.990 -999.990 1.116 ..P WKT 2010 10 04 14 04 55 31.3200 -97.3300 251.000 30.0 136.000 6.080 -999.990 -999.990 1.360 ..P WKT 2010 10 04 14 09 55 31.3200 -97.3300 251.000 122.0 129.439 5.890 -999.990 -999.990 1.294 ..P WKT 2010 10 04 14 14 55 31.3200 -97.3300 251.000 457.0 101.642 5.680 -999.990 -999.990 1.016 ..P WKT 2010 10 04 14 19 55 31.3200 -97.3300 251.000 30.0 131.015 5.840 -999.990 -999.990 1.310 ..P WKT 2010 10 04 14 24 55 31.3200 -97.3300 251.000 122.0 122.275 5.590 -999.990 -999.990 1.223 ..P WKT 2010 10 04 14 29 55 31.3200 -97.3300 251.000 457.0 104.005 5.600 -999.990 -999.990 1.040 ..P WKT 2010 10 04 14 39 55 31.3200 -97.3300 251.000 30.0 119.331 5.680 -999.990 -999.990 1.193 ..P WKT 2010 10 04 14 44 55 31.3200 -97.3300 251.000 122.0 122.706 5.740 -999.990 -999.990 1.227 ..P WKT 2010 10 04 14 49 55 31.3200 -97.3300 251.000 457.0 109.472 6.090 -999.990 -999.990 1.095 ..P WKT 2010 10 04 14 54 55 31.3200 -97.3300 251.000 30.0 125.236 5.620 -999.990 -999.990 1.252 ..P WKT 2010 10 04 14 59 55 31.3200 -97.3300 251.000 122.0 122.757 5.560 -999.990 -999.990 1.228 ..P WKT 2010 10 04 15 04 55 31.3200 -97.3300 251.000 457.0 104.894 5.730 -999.990 -999.990 1.049 ..P WKT 2010 10 04 15 14 55 31.3200 -97.3300 251.000 30.0 119.890 5.590 -999.990 -999.990 1.199 ..P WKT 2010 10 04 15 19 55 31.3200 -97.3300 251.000 122.0 127.428 5.480 -999.990 -999.990 1.274 ..P WKT 2010 10 04 15 24 55 31.3200 -97.3300 251.000 457.0 108.688 5.700 -999.990 -999.990 1.087 ..P WKT 2010 10 04 15 29 55 31.3200 -97.3300 251.000 30.0 114.728 5.940 -999.990 -999.990 1.147 ..P WKT 2010 10 04 15 34 55 31.3200 -97.3300 251.000 122.0 122.811 6.280 -999.990 -999.990 1.228 ..P WKT 2010 10 04 15 39 55 31.3200 -97.3300 251.000 457.0 103.253 6.020 -999.990 -999.990 1.033 ..P WKT 2010 10 04 15 49 55 31.3200 -97.3300 251.000 30.0 124.068 5.880 -999.990 -999.990 1.241 ..P WKT 2010 10 04 15 54 55 31.3200 -97.3300 251.000 122.0 126.180 6.440 -999.990 -999.990 1.262 ..P WKT 2010 10 04 15 59 55 31.3200 -97.3300 251.000 457.0 113.312 6.040 -999.990 -999.990 1.133 ..P WKT 2010 10 04 16 04 55 31.3200 -97.3300 251.000 30.0 116.512 5.880 -999.990 -999.990 1.165 ..P WKT 2010 10 04 16 09 55 31.3200 -97.3300 251.000 122.0 121.756 5.900 -999.990 -999.990 1.218 ..P WKT 2010 10 04 16 14 55 31.3200 -97.3300 251.000 457.0 120.736 6.080 -999.990 -999.990 1.207 ..P WKT 2010 10 04 16 24 55 31.3200 -97.3300 251.000 30.0 123.519 6.600 -999.990 -999.990 1.235 ..P WKT 2010 10 04 16 29 55 31.3200 -97.3300 251.000 122.0 122.148 6.460 -999.990 -999.990 1.221 ..P WKT 2010 10 04 16 34 55 31.3200 -97.3300 251.000 457.0 115.465 6.140 -999.990 -999.990 1.155 ..P WKT 2010 10 04 16 39 55 31.3200 -97.3300 251.000 30.0 116.137 5.840 -999.990 -999.990 1.161 ..P WKT 2010 10 04 16 44 55 31.3200 -97.3300 251.000 122.0 111.906 5.530 -999.990 -999.990 1.119 ..P WKT 2010 10 04 16 49 55 31.3200 -97.3300 251.000 457.0 116.392 5.730 -999.990 -999.990 1.164 ..P WKT 2010 10 04 17 04 55 31.3200 -97.3300 251.000 30.0 114.292 5.570 -999.990 -999.990 1.143 ..P WKT 2010 10 04 17 09 55 31.3200 -97.3300 251.000 122.0 110.182 6.550 -999.990 -999.990 1.102 ..P WKT 2010 10 04 17 14 55 31.3200 -97.3300 251.000 457.0 118.331 5.670 -999.990 -999.990 1.183 ..P WKT 2010 10 04 17 19 55 31.3200 -97.3300 251.000 30.0 116.401 5.530 -999.990 -999.990 1.164 ..P WKT 2010 10 04 17 24 55 31.3200 -97.3300 251.000 122.0 117.467 5.180 -999.990 -999.990 1.175 ..P WKT 2010 10 04 17 29 55 31.3200 -97.3300 251.000 457.0 113.356 5.860 -999.990 -999.990 1.134 ..P WKT 2010 10 04 17 39 55 31.3200 -97.3300 251.000 30.0 114.082 5.190 -999.990 -999.990 1.141 ..P WKT 2010 10 04 17 44 55 31.3200 -97.3300 251.000 122.0 116.740 5.310 -999.990 -999.990 1.167 ..P WKT 2010 10 04 17 49 55 31.3200 -97.3300 251.000 457.0 120.759 5.530 -999.990 -999.990 1.208 ..P WKT 2010 10 04 17 54 55 31.3200 -97.3300 251.000 30.0 124.780 5.080 -999.990 -999.990 1.248 ..P WKT 2010 10 04 17 59 55 31.3200 -97.3300 251.000 122.0 115.448 5.680 -999.990 -999.990 1.154 ..P WKT 2010 10 04 18 04 55 31.3200 -97.3300 251.000 457.0 117.560 5.060 -999.990 -999.990 1.176 ..P WKT 2010 10 04 18 14 55 31.3200 -97.3300 251.000 30.0 126.515 5.060 -999.990 -999.990 1.265 ..P WKT 2010 10 04 18 19 55 31.3200 -97.3300 251.000 122.0 122.185 5.070 -999.990 -999.990 1.222 ..P WKT 2010 10 04 18 24 55 31.3200 -97.3300 251.000 457.0 113.494 5.370 -999.990 -999.990 1.135 ..P WKT 2010 10 04 18 29 55 31.3200 -97.3300 251.000 30.0 119.519 5.060 -999.990 -999.990 1.195 ..P WKT 2010 10 04 18 34 55 31.3200 -97.3300 251.000 122.0 119.958 5.530 -999.990 -999.990 1.200 ..P WKT 2010 10 04 18 39 55 31.3200 -97.3300 251.000 457.0 118.625 5.020 -999.990 -999.990 1.186 ..P WKT 2010 10 04 18 49 55 31.3200 -97.3300 251.000 30.0 121.410 6.260 -999.990 -999.990 1.214 ..P WKT 2010 10 04 18 54 55 31.3200 -97.3300 251.000 122.0 120.214 6.270 -999.990 -999.990 1.202 ..P WKT 2010 10 04 18 59 55 31.3200 -97.3300 251.000 457.0 116.428 5.530 -999.990 -999.990 1.164 ..P WKT 2010 10 04 19 04 55 31.3200 -97.3300 251.000 30.0 118.503 5.620 -999.990 -999.990 1.185 ..P WKT 2010 10 04 19 09 55 31.3200 -97.3300 251.000 122.0 116.079 5.390 -999.990 -999.990 1.161 ..P WKT 2010 10 04 19 14 55 31.3200 -97.3300 251.000 457.0 114.338 5.890 -999.990 -999.990 1.143 ..P WKT 2010 10 04 19 24 55 31.3200 -97.3300 251.000 30.0 116.675 4.960 -999.990 -999.990 1.167 ..P WKT 2010 10 04 19 29 55 31.3200 -97.3300 251.000 122.0 118.983 5.530 -999.990 -999.990 1.190 ..P WKT 2010 10 04 19 34 55 31.3200 -97.3300 251.000 457.0 123.472 5.280 -999.990 -999.990 1.235 ..P WKT 2010 10 04 19 39 55 31.3200 -97.3300 251.000 30.0 119.510 5.340 -999.990 -999.990 1.195 ..P WKT 2010 10 04 19 44 55 31.3200 -97.3300 251.000 122.0 121.954 5.090 -999.990 -999.990 1.220 ..P WKT 2010 10 04 19 49 55 31.3200 -97.3300 251.000 457.0 113.767 5.860 -999.990 -999.990 1.138 ..P WKT 2010 10 04 19 59 55 31.3200 -97.3300 251.000 30.0 115.365 5.120 -999.990 -999.990 1.154 ..P WKT 2010 10 04 20 04 55 31.3200 -97.3300 251.000 122.0 121.198 5.050 -999.990 -999.990 1.212 ..P WKT 2010 10 04 20 09 55 31.3200 -97.3300 251.000 457.0 116.262 5.470 -999.990 -999.990 1.163 ..P WKT 2010 10 04 20 14 55 31.3200 -97.3300 251.000 30.0 114.734 5.140 -999.990 -999.990 1.147 ..P WKT 2010 10 04 20 19 55 31.3200 -97.3300 251.000 122.0 117.704 5.140 -999.990 -999.990 1.177 ..P WKT 2010 10 04 20 24 55 31.3200 -97.3300 251.000 457.0 112.359 6.900 -999.990 -999.990 1.124 ..P WKT 2010 10 04 20 34 55 31.3200 -97.3300 251.000 30.0 111.289 5.440 -999.990 -999.990 1.113 ..P WKT 2010 10 04 20 39 55 31.3200 -97.3300 251.000 122.0 108.612 5.650 -999.990 -999.990 1.086 ..P WKT 2010 10 04 20 44 55 31.3200 -97.3300 251.000 457.0 117.387 5.180 -999.990 -999.990 1.174 ..P WKT 2010 10 04 20 49 55 31.3200 -97.3300 251.000 30.0 111.983 5.060 -999.990 -999.990 1.120 ..P WKT 2010 10 04 20 54 55 31.3200 -97.3300 251.000 122.0 114.214 5.650 -999.990 -999.990 1.142 ..P WKT 2010 10 04 20 59 55 31.3200 -97.3300 251.000 457.0 111.263 5.470 -999.990 -999.990 1.113 ..P WKT 2010 10 04 21 09 55 31.3200 -97.3300 251.000 30.0 109.687 5.960 -999.990 -999.990 1.097 ..P WKT 2010 10 04 21 14 55 31.3200 -97.3300 251.000 122.0 111.606 5.710 -999.990 -999.990 1.116 ..P WKT 2010 10 04 21 19 55 31.3200 -97.3300 251.000 457.0 113.525 5.040 -999.990 -999.990 1.135 ..P WKT 2010 10 04 21 24 55 31.3200 -97.3300 251.000 30.0 113.808 5.020 -999.990 -999.990 1.138 ..P WKT 2010 10 04 21 29 55 31.3200 -97.3300 251.000 122.0 116.273 5.400 -999.990 -999.990 1.163 ..P WKT 2010 10 04 21 34 55 31.3200 -97.3300 251.000 457.0 113.557 5.110 -999.990 -999.990 1.136 ..P WKT 2010 10 04 21 44 55 31.3200 -97.3300 251.000 30.0 119.304 5.490 -999.990 -999.990 1.193 ..P WKT 2010 10 04 21 49 55 31.3200 -97.3300 251.000 122.0 110.587 4.820 -999.990 -999.990 1.106 ..P WKT 2010 10 04 21 54 55 31.3200 -97.3300 251.000 457.0 120.143 5.580 -999.990 -999.990 1.201 ..P WKT 2010 10 04 21 59 55 31.3200 -97.3300 251.000 30.0 118.517 4.860 -999.990 -999.990 1.185 ..P WKT 2010 10 04 22 04 55 31.3200 -97.3300 251.000 122.0 116.073 5.450 -999.990 -999.990 1.161 ..P WKT 2010 10 04 22 09 55 31.3200 -97.3300 251.000 457.0 116.628 4.690 -999.990 -999.990 1.166 ..P WKT 2010 10 04 22 19 55 31.3200 -97.3300 251.000 30.0 112.246 4.640 -999.990 -999.990 1.122 ..P WKT 2010 10 04 22 24 55 31.3200 -97.3300 251.000 122.0 116.036 4.810 -999.990 -999.990 1.160 ..P WKT 2010 10 04 22 29 55 31.3200 -97.3300 251.000 457.0 113.417 4.960 -999.990 -999.990 1.134 ..P WKT 2010 10 04 22 34 55 31.3200 -97.3300 251.000 30.0 115.024 6.050 -999.990 -999.990 1.150 ..P WKT 2010 10 04 22 39 55 31.3200 -97.3300 251.000 122.0 120.179 5.250 -999.990 -999.990 1.202 ..P WKT 2010 10 04 22 44 55 31.3200 -97.3300 251.000 457.0 120.832 5.130 -999.990 -999.990 1.208 ..P WKT 2010 10 04 22 54 55 31.3200 -97.3300 251.000 30.0 117.307 5.900 -999.990 -999.990 1.173 ..P WKT 2010 10 04 22 59 55 31.3200 -97.3300 251.000 122.0 118.311 5.560 -999.990 -999.990 1.183 ..P WKT 2010 10 04 23 04 55 31.3200 -97.3300 251.000 457.0 116.451 7.420 -999.990 -999.990 1.165 ..P WKT 2010 10 04 23 09 55 31.3200 -97.3300 251.000 30.0 111.317 6.250 -999.990 -999.990 1.113 ..P WKT 2010 10 04 23 14 55 31.3200 -97.3300 251.000 122.0 113.821 5.870 -999.990 -999.990 1.138 ..P WKT 2010 10 04 23 19 55 31.3200 -97.3300 251.000 457.0 113.870 6.150 -999.990 -999.990 1.139 ..P WKT 2010 10 04 23 29 55 31.3200 -97.3300 251.000 30.0 112.720 6.070 -999.990 -999.990 1.127 ..P WKT 2010 10 04 23 34 55 31.3200 -97.3300 251.000 122.0 121.205 5.940 -999.990 -999.990 1.212 ..P WKT 2010 10 04 23 39 55 31.3200 -97.3300 251.000 457.0 116.458 5.720 -999.990 -999.990 1.165 ..P WKT 2010 10 04 23 44 55 31.3200 -97.3300 251.000 30.0 119.487 5.650 -999.990 -999.990 1.195 ..P WKT 2010 10 04 23 49 55 31.3200 -97.3300 251.000 122.0 122.789 5.460 -999.990 -999.990 1.228 ..P WKT 2010 10 05 00 09 55 31.3200 -97.3300 251.000 457.0 122.503 5.110 -999.990 -999.990 1.225 ..P WKT 2010 10 05 00 10 25 31.3200 -97.3300 251.000 457.0 125.181 5.050 -999.990 -999.990 1.252 ..P WKT 2010 10 05 00 10 55 31.3200 -97.3300 251.000 457.0 123.083 5.350 -999.990 -999.990 1.231 ..P WKT 2010 10 05 00 11 25 31.3200 -97.3300 251.000 457.0 116.345 5.310 -999.990 -999.990 1.163 ..P WKT 2010 10 05 00 11 55 31.3200 -97.3300 251.000 457.0 120.114 5.290 -999.990 -999.990 1.201 ..P WKT 2010 10 05 00 12 25 31.3200 -97.3300 251.000 457.0 118.835 5.260 -999.990 -999.990 1.188 ..P WKT 2010 10 05 00 12 55 31.3200 -97.3300 251.000 457.0 119.739 4.990 -999.990 -999.990 1.197 ..P WKT 2010 10 05 00 13 25 31.3200 -97.3300 251.000 457.0 117.367 4.920 -999.990 -999.990 1.174 ..P WKT 2010 10 05 00 13 55 31.3200 -97.3300 251.000 457.0 117.862 5.140 -999.990 -999.990 1.179 ..P WKT 2010 10 05 00 14 25 31.3200 -97.3300 251.000 457.0 118.220 5.160 -999.990 -999.990 1.182 ..P WKT 2010 10 05 00 14 55 31.3200 -97.3300 251.000 457.0 117.077 4.880 -999.990 -999.990 1.171 ..P WKT 2010 10 05 00 19 55 31.3200 -97.3300 251.000 30.0 120.248 6.700 -999.990 -999.990 1.202 ..P WKT 2010 10 05 00 24 55 31.3200 -97.3300 251.000 122.0 115.093 4.920 -999.990 -999.990 1.151 ..P WKT 2010 10 05 00 29 55 31.3200 -97.3300 251.000 457.0 113.897 5.330 -999.990 -999.990 1.139 ..P WKT 2010 10 05 00 34 55 31.3200 -97.3300 251.000 30.0 118.569 6.010 -999.990 -999.990 1.186 ..P WKT 2010 10 05 00 39 55 31.3200 -97.3300 251.000 122.0 115.051 4.720 -999.990 -999.990 1.151 ..P WKT 2010 10 05 00 44 55 31.3200 -97.3300 251.000 457.0 117.541 4.460 -999.990 -999.990 1.175 ..P WKT 2010 10 05 00 54 55 31.3200 -97.3300 251.000 30.0 128.317 4.940 -999.990 -999.990 1.283 ..P WKT 2010 10 05 00 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 10 05 01 04 55 31.3200 -97.3300 251.000 457.0 116.764 5.760 -999.990 -999.990 1.168 ..P WKT 2010 10 05 01 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 10 05 01 14 55 31.3200 -97.3300 251.000 122.0 119.685 4.870 -999.990 -999.990 1.197 ..P WKT 2010 10 05 01 19 55 31.3200 -97.3300 251.000 457.0 119.233 4.410 -999.990 -999.990 1.192 ..P WKT 2010 10 05 01 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 10 05 01 34 55 31.3200 -97.3300 251.000 122.0 123.928 4.570 -999.990 -999.990 1.239 ..P WKT 2010 10 05 01 39 55 31.3200 -97.3300 251.000 457.0 120.628 4.800 -999.990 -999.990 1.206 ..P WKT 2010 10 05 01 44 55 31.3200 -97.3300 251.000 30.0 129.622 4.840 -999.990 -999.990 1.296 ..P WKT 2010 10 05 01 49 55 31.3200 -97.3300 251.000 122.0 120.310 5.840 -999.990 -999.990 1.203 ..P WKT 2010 10 05 01 54 55 31.3200 -97.3300 251.000 457.0 128.485 5.010 -999.990 -999.990 1.285 ..P WKT 2010 10 05 02 04 55 31.3200 -97.3300 251.000 30.0 121.590 4.660 -999.990 -999.990 1.216 ..P WKT 2010 10 05 02 09 55 31.3200 -97.3300 251.000 122.0 128.108 4.970 -999.990 -999.990 1.281 ..P WKT 2010 10 05 02 14 55 31.3200 -97.3300 251.000 457.0 124.240 4.950 -999.990 -999.990 1.242 ..P WKT 2010 10 05 02 19 55 31.3200 -97.3300 251.000 30.0 120.918 4.800 -999.990 -999.990 1.209 ..P WKT 2010 10 05 02 24 55 31.3200 -97.3300 251.000 122.0 123.747 5.460 -999.990 -999.990 1.237 ..P WKT 2010 10 05 02 29 55 31.3200 -97.3300 251.000 457.0 122.748 4.730 -999.990 -999.990 1.227 ..P WKT 2010 10 05 02 39 55 31.3200 -97.3300 251.000 30.0 132.117 5.160 -999.990 -999.990 1.321 ..P WKT 2010 10 05 02 44 55 31.3200 -97.3300 251.000 122.0 137.291 4.600 -999.990 -999.990 1.373 ..P WKT 2010 10 05 02 49 55 31.3200 -97.3300 251.000 457.0 124.965 4.690 -999.990 -999.990 1.250 ..P WKT 2010 10 05 02 54 55 31.3200 -97.3300 251.000 30.0 130.959 4.830 -999.990 -999.990 1.310 ..P WKT 2010 10 05 02 59 55 31.3200 -97.3300 251.000 122.0 121.366 4.770 -999.990 -999.990 1.214 ..P WKT 2010 10 05 03 04 55 31.3200 -97.3300 251.000 457.0 130.642 4.490 -999.990 -999.990 1.306 ..P WKT 2010 10 05 03 14 55 31.3200 -97.3300 251.000 30.0 131.401 4.600 -999.990 -999.990 1.314 ..P WKT 2010 10 05 03 19 55 31.3200 -97.3300 251.000 122.0 129.718 5.380 -999.990 -999.990 1.297 ..P WKT 2010 10 05 03 24 55 31.3200 -97.3300 251.000 457.0 121.196 5.150 -999.990 -999.990 1.212 ..P WKT 2010 10 05 03 29 55 31.3200 -97.3300 251.000 30.0 124.711 5.370 -999.990 -999.990 1.247 ..P WKT 2010 10 05 03 34 55 31.3200 -97.3300 251.000 122.0 124.943 4.810 -999.990 -999.990 1.249 ..P WKT 2010 10 05 03 39 55 31.3200 -97.3300 251.000 457.0 116.283 4.240 -999.990 -999.990 1.163 ..P WKT 2010 10 05 03 49 55 31.3200 -97.3300 251.000 30.0 145.304 4.260 -999.990 -999.990 1.453 ..P WKT 2010 10 05 03 54 55 31.3200 -97.3300 251.000 122.0 132.773 4.250 -999.990 -999.990 1.328 ..P WKT 2010 10 05 03 59 55 31.3200 -97.3300 251.000 457.0 116.134 4.900 -999.990 -999.990 1.161 ..P WKT 2010 10 05 04 04 55 31.3200 -97.3300 251.000 30.0 136.718 4.790 -999.990 -999.990 1.367 ..P WKT 2010 10 05 04 09 55 31.3200 -97.3300 251.000 122.0 119.531 4.650 -999.990 -999.990 1.195 ..P WKT 2010 10 05 04 14 55 31.3200 -97.3300 251.000 457.0 119.176 4.690 -999.990 -999.990 1.192 ..P WKT 2010 10 05 04 24 55 31.3200 -97.3300 251.000 30.0 125.526 4.350 -999.990 -999.990 1.255 ..P WKT 2010 10 05 04 29 55 31.3200 -97.3300 251.000 122.0 114.982 7.790 -999.990 -999.990 1.150 ..P WKT 2010 10 05 04 34 55 31.3200 -97.3300 251.000 457.0 109.367 4.560 -999.990 -999.990 1.094 ..P WKT 2010 10 05 04 39 55 31.3200 -97.3300 251.000 30.0 131.406 5.130 -999.990 -999.990 1.314 ..P WKT 2010 10 05 04 44 55 31.3200 -97.3300 251.000 122.0 127.159 4.960 -999.990 -999.990 1.272 ..P WKT 2010 10 05 04 49 55 31.3200 -97.3300 251.000 457.0 110.589 5.960 -999.990 -999.990 1.106 ..P WKT 2010 10 05 05 04 55 31.3200 -97.3300 251.000 30.0 133.216 4.650 -999.990 -999.990 1.332 ..P WKT 2010 10 05 05 09 55 31.3200 -97.3300 251.000 122.0 143.506 5.010 -999.990 -999.990 1.435 ..P WKT 2010 10 05 05 14 55 31.3200 -97.3300 251.000 457.0 116.266 5.830 -999.990 -999.990 1.163 ..P WKT 2010 10 05 05 19 55 31.3200 -97.3300 251.000 30.0 127.105 4.900 -999.990 -999.990 1.271 ..P WKT 2010 10 05 05 24 55 31.3200 -97.3300 251.000 122.0 150.273 4.460 -999.990 -999.990 1.503 ..P WKT 2010 10 05 05 29 55 31.3200 -97.3300 251.000 457.0 130.701 4.580 -999.990 -999.990 1.307 ..P WKT 2010 10 05 05 39 55 31.3200 -97.3300 251.000 30.0 134.240 4.620 -999.990 -999.990 1.342 ..P WKT 2010 10 05 05 44 55 31.3200 -97.3300 251.000 122.0 131.321 5.030 -999.990 -999.990 1.313 ..P WKT 2010 10 05 05 49 55 31.3200 -97.3300 251.000 457.0 171.705 6.050 -999.990 -999.990 1.717 ..P WKT 2010 10 05 05 54 55 31.3200 -97.3300 251.000 30.0 138.365 4.860 -999.990 -999.990 1.384 ..P WKT 2010 10 05 05 59 55 31.3200 -97.3300 251.000 122.0 123.386 4.750 -999.990 -999.990 1.234 ..P WKT 2010 10 05 06 04 55 31.3200 -97.3300 251.000 457.0 133.349 4.840 -999.990 -999.990 1.333 ..P WKT 2010 10 05 06 14 55 31.3200 -97.3300 251.000 30.0 133.267 4.970 -999.990 -999.990 1.333 ..P WKT 2010 10 05 06 19 55 31.3200 -97.3300 251.000 122.0 133.501 4.940 -999.990 -999.990 1.335 ..P WKT 2010 10 05 06 24 55 31.3200 -97.3300 251.000 457.0 136.476 4.650 -999.990 -999.990 1.365 ..P WKT 2010 10 05 06 29 55 31.3200 -97.3300 251.000 30.0 126.289 5.090 -999.990 -999.990 1.263 ..P WKT 2010 10 05 06 34 55 31.3200 -97.3300 251.000 122.0 120.489 5.580 -999.990 -999.990 1.205 ..P WKT 2010 10 05 06 39 55 31.3200 -97.3300 251.000 457.0 145.403 4.640 -999.990 -999.990 1.454 ..P WKT 2010 10 05 06 49 55 31.3200 -97.3300 251.000 30.0 139.347 4.520 -999.990 -999.990 1.393 ..P WKT 2010 10 05 06 54 55 31.3200 -97.3300 251.000 122.0 129.354 4.920 -999.990 -999.990 1.294 ..P WKT 2010 10 05 06 59 55 31.3200 -97.3300 251.000 457.0 189.993 6.110 -999.990 -999.990 1.900 ..P WKT 2010 10 05 07 04 55 31.3200 -97.3300 251.000 30.0 138.853 5.650 -999.990 -999.990 1.389 ..P WKT 2010 10 05 07 09 55 31.3200 -97.3300 251.000 122.0 130.915 5.170 -999.990 -999.990 1.309 ..P WKT 2010 10 05 07 14 55 31.3200 -97.3300 251.000 457.0 121.331 4.160 -999.990 -999.990 1.213 ..P WKT 2010 10 05 07 24 55 31.3200 -97.3300 251.000 30.0 142.061 5.040 -999.990 -999.990 1.421 ..P WKT 2010 10 05 07 29 55 31.3200 -97.3300 251.000 122.0 123.949 5.000 -999.990 -999.990 1.239 ..P WKT 2010 10 05 07 34 55 31.3200 -97.3300 251.000 457.0 123.397 5.400 -999.990 -999.990 1.234 ..P WKT 2010 10 05 07 39 55 31.3200 -97.3300 251.000 30.0 136.568 4.660 -999.990 -999.990 1.366 ..P WKT 2010 10 05 07 44 55 31.3200 -97.3300 251.000 122.0 121.745 4.030 -999.990 -999.990 1.217 ..P WKT 2010 10 05 07 49 55 31.3200 -97.3300 251.000 457.0 124.625 3.970 -999.990 -999.990 1.246 ..P WKT 2010 10 05 07 59 55 31.3200 -97.3300 251.000 30.0 131.679 3.890 -999.990 -999.990 1.317 ..P WKT 2010 10 05 08 04 55 31.3200 -97.3300 251.000 122.0 112.931 4.390 -999.990 -999.990 1.129 ..P WKT 2010 10 05 08 09 55 31.3200 -97.3300 251.000 457.0 113.398 4.190 -999.990 -999.990 1.134 ..P WKT 2010 10 05 08 14 55 31.3200 -97.3300 251.000 30.0 131.301 4.200 -999.990 -999.990 1.313 ..P WKT 2010 10 05 08 19 55 31.3200 -97.3300 251.000 122.0 123.943 3.830 -999.990 -999.990 1.239 ..P WKT 2010 10 05 08 24 55 31.3200 -97.3300 251.000 457.0 115.900 4.310 -999.990 -999.990 1.159 ..P WKT 2010 10 05 08 34 55 31.3200 -97.3300 251.000 30.0 138.590 4.180 -999.990 -999.990 1.386 ..P WKT 2010 10 05 08 39 55 31.3200 -97.3300 251.000 122.0 116.322 3.970 -999.990 -999.990 1.163 ..P WKT 2010 10 05 08 44 55 31.3200 -97.3300 251.000 457.0 115.475 5.260 -999.990 -999.990 1.155 ..P WKT 2010 10 05 08 49 55 31.3200 -97.3300 251.000 30.0 139.625 6.040 -999.990 -999.990 1.396 ..P WKT 2010 10 05 08 54 55 31.3200 -97.3300 251.000 122.0 121.749 5.180 -999.990 -999.990 1.217 ..P WKT 2010 10 05 08 59 55 31.3200 -97.3300 251.000 457.0 112.386 4.290 -999.990 -999.990 1.124 ..P WKT 2010 10 05 09 09 55 31.3200 -97.3300 251.000 30.0 129.453 4.460 -999.990 -999.990 1.295 ..P WKT 2010 10 05 09 14 55 31.3200 -97.3300 251.000 122.0 119.343 5.090 -999.990 -999.990 1.193 ..P WKT 2010 10 05 09 19 55 31.3200 -97.3300 251.000 457.0 123.521 6.250 -999.990 -999.990 1.235 ..P WKT 2010 10 05 09 24 55 31.3200 -97.3300 251.000 30.0 135.120 6.210 -999.990 -999.990 1.351 ..P WKT 2010 10 05 09 29 55 31.3200 -97.3300 251.000 122.0 128.856 4.590 -999.990 -999.990 1.289 ..P WKT 2010 10 05 09 34 55 31.3200 -97.3300 251.000 457.0 123.966 4.050 -999.990 -999.990 1.240 ..P WKT 2010 10 05 09 44 55 31.3200 -97.3300 251.000 30.0 140.453 4.180 -999.990 -999.990 1.405 ..P WKT 2010 10 05 09 49 55 31.3200 -97.3300 251.000 122.0 134.345 5.150 -999.990 -999.990 1.343 ..P WKT 2010 10 05 09 54 55 31.3200 -97.3300 251.000 457.0 132.635 4.180 -999.990 -999.990 1.326 ..P WKT 2010 10 05 09 59 55 31.3200 -97.3300 251.000 30.0 144.671 4.890 -999.990 -999.990 1.447 ..P WKT 2010 10 05 10 04 55 31.3200 -97.3300 251.000 122.0 124.265 4.580 -999.990 -999.990 1.243 ..P WKT 2010 10 05 10 09 55 31.3200 -97.3300 251.000 457.0 124.479 5.040 -999.990 -999.990 1.245 ..P WKT 2010 10 05 10 19 55 31.3200 -97.3300 251.000 30.0 139.480 4.840 -999.990 -999.990 1.395 ..P WKT 2010 10 05 10 24 55 31.3200 -97.3300 251.000 122.0 128.557 4.840 -999.990 -999.990 1.286 ..P WKT 2010 10 05 10 29 55 31.3200 -97.3300 251.000 457.0 122.584 5.060 -999.990 -999.990 1.226 ..P WKT 2010 10 05 10 34 55 31.3200 -97.3300 251.000 30.0 144.113 5.140 -999.990 -999.990 1.441 ..P WKT 2010 10 05 10 39 55 31.3200 -97.3300 251.000 122.0 146.528 5.790 -999.990 -999.990 1.465 ..P WKT 2010 10 05 10 44 55 31.3200 -97.3300 251.000 457.0 117.585 7.300 -999.990 -999.990 1.176 ..P WKT 2010 10 05 10 54 55 31.3200 -97.3300 251.000 30.0 138.154 5.630 -999.990 -999.990 1.382 ..P WKT 2010 10 05 10 59 55 31.3200 -97.3300 251.000 122.0 117.930 5.320 -999.990 -999.990 1.179 ..P WKT 2010 10 05 11 04 55 31.3200 -97.3300 251.000 457.0 111.874 7.160 -999.990 -999.990 1.119 ..P WKT 2010 10 05 11 09 55 31.3200 -97.3300 251.000 30.0 136.360 5.630 -999.990 -999.990 1.364 ..P WKT 2010 10 05 11 14 55 31.3200 -97.3300 251.000 122.0 121.774 3.900 -999.990 -999.990 1.218 ..P WKT 2010 10 05 11 19 55 31.3200 -97.3300 251.000 457.0 111.727 3.560 -999.990 -999.990 1.117 ..P WKT 2010 10 05 11 29 55 31.3200 -97.3300 251.000 30.0 141.224 4.070 -999.990 -999.990 1.412 ..P WKT 2010 10 05 11 34 55 31.3200 -97.3300 251.000 122.0 122.835 3.680 -999.990 -999.990 1.228 ..P WKT 2010 10 05 11 39 55 31.3200 -97.3300 251.000 457.0 112.839 3.590 -999.990 -999.990 1.128 ..P WKT 2010 10 05 11 44 55 31.3200 -97.3300 251.000 30.0 144.961 4.240 -999.990 -999.990 1.450 ..P WKT 2010 10 05 11 49 55 31.3200 -97.3300 251.000 122.0 126.569 3.530 -999.990 -999.990 1.266 ..P WKT 2010 10 05 12 09 55 31.3200 -97.3300 251.000 457.0 119.188 4.040 -999.990 -999.990 1.192 ..P WKT 2010 10 05 12 10 25 31.3200 -97.3300 251.000 457.0 114.323 3.400 -999.990 -999.990 1.143 ..P WKT 2010 10 05 12 10 55 31.3200 -97.3300 251.000 457.0 113.036 3.430 -999.990 -999.990 1.130 ..P WKT 2010 10 05 12 11 25 31.3200 -97.3300 251.000 457.0 116.567 3.680 -999.990 -999.990 1.166 ..P WKT 2010 10 05 12 11 55 31.3200 -97.3300 251.000 457.0 112.527 3.670 -999.990 -999.990 1.125 ..P WKT 2010 10 05 12 12 25 31.3200 -97.3300 251.000 457.0 106.698 4.060 -999.990 -999.990 1.067 ..P WKT 2010 10 05 12 12 55 31.3200 -97.3300 251.000 457.0 108.440 4.080 -999.990 -999.990 1.084 ..P WKT 2010 10 05 12 13 25 31.3200 -97.3300 251.000 457.0 111.007 3.820 -999.990 -999.990 1.110 ..P WKT 2010 10 05 12 13 55 31.3200 -97.3300 251.000 457.0 104.765 4.410 -999.990 -999.990 1.048 ..P WKT 2010 10 05 12 14 25 31.3200 -97.3300 251.000 457.0 107.194 3.460 -999.990 -999.990 1.072 ..P WKT 2010 10 05 12 14 55 31.3200 -97.3300 251.000 457.0 107.697 3.750 -999.990 -999.990 1.077 ..P WKT 2010 10 05 12 19 55 31.3200 -97.3300 251.000 30.0 136.395 4.450 -999.990 -999.990 1.364 ..P WKT 2010 10 05 12 24 55 31.3200 -97.3300 251.000 122.0 114.445 4.070 -999.990 -999.990 1.144 ..P WKT 2010 10 05 12 29 55 31.3200 -97.3300 251.000 457.0 109.287 4.450 -999.990 -999.990 1.093 ..P WKT 2010 10 05 12 34 55 31.3200 -97.3300 251.000 30.0 126.145 4.390 -999.990 -999.990 1.261 ..P WKT 2010 10 05 12 39 55 31.3200 -97.3300 251.000 122.0 120.435 4.340 -999.990 -999.990 1.204 ..P WKT 2010 10 05 12 44 55 31.3200 -97.3300 251.000 457.0 113.902 3.750 -999.990 -999.990 1.139 ..P WKT 2010 10 05 12 54 55 31.3200 -97.3300 251.000 30.0 134.286 3.550 -999.990 -999.990 1.343 ..P WKT 2010 10 05 12 59 55 31.3200 -97.3300 251.000 122.0 115.533 4.200 -999.990 -999.990 1.155 ..P WKT 2010 10 05 13 04 55 31.3200 -97.3300 251.000 457.0 111.086 4.420 -999.990 -999.990 1.111 ..P WKT 2010 10 05 13 09 55 31.3200 -97.3300 251.000 30.0 129.470 3.990 -999.990 -999.990 1.295 ..P WKT 2010 10 05 13 14 55 31.3200 -97.3300 251.000 122.0 125.298 4.890 -999.990 -999.990 1.253 ..P WKT 2010 10 05 13 19 55 31.3200 -97.3300 251.000 457.0 112.052 3.300 -999.990 -999.990 1.121 ..P WKT 2010 10 05 13 29 55 31.3200 -97.3300 251.000 30.0 144.369 3.470 -999.990 -999.990 1.444 ..P WKT 2010 10 05 13 34 55 31.3200 -97.3300 251.000 122.0 123.111 3.420 -999.990 -999.990 1.231 ..P WKT 2010 10 05 13 39 55 31.3200 -97.3300 251.000 457.0 115.878 3.680 -999.990 -999.990 1.159 ..P WKT 2010 10 05 13 44 55 31.3200 -97.3300 251.000 30.0 146.309 3.560 -999.990 -999.990 1.463 ..P WKT 2010 10 05 13 49 55 31.3200 -97.3300 251.000 122.0 131.103 3.700 -999.990 -999.990 1.311 ..P WKT 2010 10 05 13 54 55 31.3200 -97.3300 251.000 457.0 122.497 3.400 -999.990 -999.990 1.225 ..P WKT 2010 10 05 14 04 55 31.3200 -97.3300 251.000 30.0 142.979 3.490 -999.990 -999.990 1.430 ..P WKT 2010 10 05 14 09 55 31.3200 -97.3300 251.000 122.0 140.458 3.850 -999.990 -999.990 1.405 ..P WKT 2010 10 05 14 14 55 31.3200 -97.3300 251.000 457.0 118.015 4.170 -999.990 -999.990 1.180 ..P WKT 2010 10 05 14 19 55 31.3200 -97.3300 251.000 30.0 139.128 3.920 -999.990 -999.990 1.391 ..P WKT 2010 10 05 14 24 55 31.3200 -97.3300 251.000 122.0 142.240 3.510 -999.990 -999.990 1.422 ..P WKT 2010 10 05 14 29 55 31.3200 -97.3300 251.000 457.0 126.946 3.890 -999.990 -999.990 1.269 ..P WKT 2010 10 05 14 39 55 31.3200 -97.3300 251.000 30.0 138.194 4.330 -999.990 -999.990 1.382 ..P WKT 2010 10 05 14 44 55 31.3200 -97.3300 251.000 122.0 143.033 3.730 -999.990 -999.990 1.430 ..P WKT 2010 10 05 14 49 55 31.3200 -97.3300 251.000 457.0 122.053 4.040 -999.990 -999.990 1.221 ..P WKT 2010 10 05 14 54 55 31.3200 -97.3300 251.000 30.0 140.486 5.740 -999.990 -999.990 1.405 ..P WKT 2010 10 05 14 59 55 31.3200 -97.3300 251.000 122.0 132.829 4.480 -999.990 -999.990 1.328 ..P WKT 2010 10 05 15 04 55 31.3200 -97.3300 251.000 457.0 119.680 5.120 -999.990 -999.990 1.197 ..P WKT 2010 10 05 15 14 55 31.3200 -97.3300 251.000 30.0 127.218 4.800 -999.990 -999.990 1.272 ..P WKT 2010 10 05 15 19 55 31.3200 -97.3300 251.000 122.0 132.113 4.460 -999.990 -999.990 1.321 ..P WKT 2010 10 05 15 24 55 31.3200 -97.3300 251.000 457.0 111.753 4.320 -999.990 -999.990 1.118 ..P WKT 2010 10 05 15 29 55 31.3200 -97.3300 251.000 30.0 132.844 4.600 -999.990 -999.990 1.328 ..P WKT 2010 10 05 15 34 55 31.3200 -97.3300 251.000 122.0 130.465 4.270 -999.990 -999.990 1.305 ..P WKT 2010 10 05 15 39 55 31.3200 -97.3300 251.000 457.0 113.265 4.930 -999.990 -999.990 1.133 ..P WKT 2010 10 05 15 49 55 31.3200 -97.3300 251.000 30.0 133.247 3.540 -999.990 -999.990 1.332 ..P WKT 2010 10 05 15 54 55 31.3200 -97.3300 251.000 122.0 130.633 3.770 -999.990 -999.990 1.306 ..P WKT 2010 10 05 15 59 55 31.3200 -97.3300 251.000 457.0 111.968 3.950 -999.990 -999.990 1.120 ..P WKT 2010 10 05 16 04 55 31.3200 -97.3300 251.000 30.0 134.733 4.760 -999.990 -999.990 1.347 ..P WKT 2010 10 05 16 09 55 31.3200 -97.3300 251.000 122.0 132.120 4.280 -999.990 -999.990 1.321 ..P WKT 2010 10 05 16 14 55 31.3200 -97.3300 251.000 457.0 115.517 4.820 -999.990 -999.990 1.155 ..P WKT 2010 10 05 16 24 55 31.3200 -97.3300 251.000 30.0 124.850 4.800 -999.990 -999.990 1.248 ..P WKT 2010 10 05 16 29 55 31.3200 -97.3300 251.000 122.0 125.549 5.600 -999.990 -999.990 1.255 ..P WKT 2010 10 05 16 34 55 31.3200 -97.3300 251.000 457.0 124.053 4.520 -999.990 -999.990 1.241 ..P WKT 2010 10 05 16 39 55 31.3200 -97.3300 251.000 30.0 122.558 4.600 -999.990 -999.990 1.226 ..P WKT 2010 10 05 16 44 55 31.3200 -97.3300 251.000 122.0 132.306 4.060 -999.990 -999.990 1.323 ..P WKT 2010 10 05 16 49 55 31.3200 -97.3300 251.000 457.0 125.601 3.830 -999.990 -999.990 1.256 ..P WKT 2010 10 05 17 04 55 31.3200 -97.3300 251.000 30.0 126.902 3.830 -999.990 -999.990 1.269 ..P WKT 2010 10 05 17 09 55 31.3200 -97.3300 251.000 122.0 131.041 4.140 -999.990 -999.990 1.310 ..P WKT 2010 10 05 17 14 55 31.3200 -97.3300 251.000 457.0 133.261 3.970 -999.990 -999.990 1.333 ..P WKT 2010 10 05 17 19 55 31.3200 -97.3300 251.000 30.0 128.903 3.860 -999.990 -999.990 1.289 ..P WKT 2010 10 05 17 24 55 31.3200 -97.3300 251.000 122.0 133.863 4.670 -999.990 -999.990 1.339 ..P WKT 2010 10 05 17 29 55 31.3200 -97.3300 251.000 457.0 131.972 3.620 -999.990 -999.990 1.320 ..P WKT 2010 10 05 17 39 55 31.3200 -97.3300 251.000 30.0 126.512 4.070 -999.990 -999.990 1.265 ..P WKT 2010 10 05 17 44 55 31.3200 -97.3300 251.000 122.0 134.176 4.100 -999.990 -999.990 1.342 ..P WKT 2010 10 05 17 49 55 31.3200 -97.3300 251.000 457.0 131.430 3.850 -999.990 -999.990 1.314 ..P WKT 2010 10 05 17 54 55 31.3200 -97.3300 251.000 30.0 128.684 3.820 -999.990 -999.990 1.287 ..P WKT 2010 10 05 17 59 55 31.3200 -97.3300 251.000 122.0 126.486 3.350 -999.990 -999.990 1.265 ..P WKT 2010 10 05 18 04 55 31.3200 -97.3300 251.000 457.0 127.985 3.550 -999.990 -999.990 1.280 ..P WKT 2010 10 05 18 14 55 31.3200 -97.3300 251.000 30.0 124.686 3.200 -999.990 -999.990 1.247 ..P WKT 2010 10 05 18 19 55 31.3200 -97.3300 251.000 122.0 132.072 4.210 -999.990 -999.990 1.321 ..P WKT 2010 10 05 18 24 55 31.3200 -97.3300 251.000 457.0 121.113 3.450 -999.990 -999.990 1.211 ..P WKT 2010 10 05 18 29 55 31.3200 -97.3300 251.000 30.0 128.088 3.390 -999.990 -999.990 1.281 ..P WKT 2010 10 05 18 34 55 31.3200 -97.3300 251.000 122.0 129.039 3.950 -999.990 -999.990 1.290 ..P WKT 2010 10 05 18 39 55 31.3200 -97.3300 251.000 457.0 123.969 5.090 -999.990 -999.990 1.240 ..P WKT 2010 10 05 18 49 55 31.3200 -97.3300 251.000 30.0 129.723 4.180 -999.990 -999.990 1.297 ..P WKT 2010 10 05 18 54 55 31.3200 -97.3300 251.000 122.0 129.188 4.630 -999.990 -999.990 1.292 ..P WKT 2010 10 05 18 59 55 31.3200 -97.3300 251.000 457.0 131.116 4.410 -999.990 -999.990 1.311 ..P WKT 2010 10 05 19 04 55 31.3200 -97.3300 251.000 30.0 127.298 3.840 -999.990 -999.990 1.273 ..P WKT 2010 10 05 19 09 55 31.3200 -97.3300 251.000 122.0 132.373 3.450 -999.990 -999.990 1.324 ..P WKT 2010 10 05 19 14 55 31.3200 -97.3300 251.000 457.0 131.154 3.250 -999.990 -999.990 1.312 ..P WKT 2010 10 05 19 24 55 31.3200 -97.3300 251.000 30.0 127.095 3.070 -999.990 -999.990 1.271 ..P WKT 2010 10 05 19 29 55 31.3200 -97.3300 251.000 122.0 124.802 3.250 -999.990 -999.990 1.248 ..P WKT 2010 10 05 19 34 55 31.3200 -97.3300 251.000 457.0 125.928 3.560 -999.990 -999.990 1.259 ..P WKT 2010 10 05 19 39 55 31.3200 -97.3300 251.000 30.0 120.218 3.820 -999.990 -999.990 1.202 ..P WKT 2010 10 05 19 44 55 31.3200 -97.3300 251.000 122.0 128.728 3.410 -999.990 -999.990 1.287 ..P WKT 2010 10 05 19 49 55 31.3200 -97.3300 251.000 457.0 131.085 3.500 -999.990 -999.990 1.311 ..P WKT 2010 10 05 19 59 55 31.3200 -97.3300 251.000 30.0 121.384 3.420 -999.990 -999.990 1.214 ..P WKT 2010 10 05 20 04 55 31.3200 -97.3300 251.000 122.0 123.272 3.460 -999.990 -999.990 1.233 ..P WKT 2010 10 05 20 09 55 31.3200 -97.3300 251.000 457.0 124.476 4.000 -999.990 -999.990 1.245 ..P WKT 2010 10 05 20 14 55 31.3200 -97.3300 251.000 30.0 126.774 3.860 -999.990 -999.990 1.268 ..P WKT 2010 10 05 20 19 55 31.3200 -97.3300 251.000 122.0 121.691 3.680 -999.990 -999.990 1.217 ..P WKT 2010 10 05 20 24 55 31.3200 -97.3300 251.000 457.0 130.548 3.820 -999.990 -999.990 1.305 ..P WKT 2010 10 05 20 34 55 31.3200 -97.3300 251.000 30.0 131.432 3.650 -999.990 -999.990 1.314 ..P WKT 2010 10 05 20 39 55 31.3200 -97.3300 251.000 122.0 130.839 3.790 -999.990 -999.990 1.308 ..P WKT 2010 10 05 20 44 55 31.3200 -97.3300 251.000 457.0 138.717 3.610 -999.990 -999.990 1.387 ..P WKT 2010 10 05 20 49 55 31.3200 -97.3300 251.000 30.0 132.387 4.730 -999.990 -999.990 1.324 ..P WKT 2010 10 05 20 54 55 31.3200 -97.3300 251.000 122.0 138.350 3.970 -999.990 -999.990 1.383 ..P WKT 2010 10 05 20 59 55 31.3200 -97.3300 251.000 457.0 134.480 4.530 -999.990 -999.990 1.345 ..P WKT 2010 10 05 21 09 55 31.3200 -97.3300 251.000 30.0 130.250 3.880 -999.990 -999.990 1.302 ..P WKT 2010 10 05 21 14 55 31.3200 -97.3300 251.000 122.0 133.170 3.980 -999.990 -999.990 1.332 ..P WKT 2010 10 05 21 19 55 31.3200 -97.3300 251.000 457.0 131.446 4.040 -999.990 -999.990 1.314 ..P WKT 2010 10 05 21 24 55 31.3200 -97.3300 251.000 30.0 131.361 3.540 -999.990 -999.990 1.314 ..P WKT 2010 10 05 21 29 55 31.3200 -97.3300 251.000 122.0 135.099 4.580 -999.990 -999.990 1.351 ..P WKT 2010 10 05 21 34 55 31.3200 -97.3300 251.000 457.0 132.010 3.940 -999.990 -999.990 1.320 ..P WKT 2010 10 05 21 44 55 31.3200 -97.3300 251.000 30.0 129.656 3.660 -999.990 -999.990 1.297 ..P WKT 2010 10 05 21 49 55 31.3200 -97.3300 251.000 122.0 132.573 3.450 -999.990 -999.990 1.326 ..P WKT 2010 10 05 21 54 55 31.3200 -97.3300 251.000 457.0 125.665 3.770 -999.990 -999.990 1.257 ..P WKT 2010 10 05 21 59 55 31.3200 -97.3300 251.000 30.0 124.488 4.000 -999.990 -999.990 1.245 ..P WKT 2010 10 05 22 04 55 31.3200 -97.3300 251.000 122.0 128.224 3.630 -999.990 -999.990 1.282 ..P WKT 2010 10 05 22 09 55 31.3200 -97.3300 251.000 457.0 129.505 3.220 -999.990 -999.990 1.295 ..P WKT 2010 10 05 22 19 55 31.3200 -97.3300 251.000 30.0 129.003 3.280 -999.990 -999.990 1.290 ..P WKT 2010 10 05 22 24 55 31.3200 -97.3300 251.000 122.0 129.542 4.510 -999.990 -999.990 1.295 ..P WKT 2010 10 05 22 29 55 31.3200 -97.3300 251.000 457.0 128.308 5.580 -999.990 -999.990 1.283 ..P WKT 2010 10 05 22 34 55 31.3200 -97.3300 251.000 30.0 130.484 3.830 -999.990 -999.990 1.305 ..P WKT 2010 10 05 22 39 55 31.3200 -97.3300 251.000 122.0 135.250 3.890 -999.990 -999.990 1.353 ..P WKT 2010 10 05 22 44 55 31.3200 -97.3300 251.000 457.0 130.879 4.880 -999.990 -999.990 1.309 ..P WKT 2010 10 05 22 54 55 31.3200 -97.3300 251.000 30.0 134.644 3.960 -999.990 -999.990 1.346 ..P WKT 2010 10 05 22 59 55 31.3200 -97.3300 251.000 122.0 138.142 5.020 -999.990 -999.990 1.381 ..P WKT 2010 10 05 23 04 55 31.3200 -97.3300 251.000 457.0 130.870 3.840 -999.990 -999.990 1.309 ..P WKT 2010 10 05 23 09 55 31.3200 -97.3300 251.000 30.0 135.459 3.610 -999.990 -999.990 1.355 ..P WKT 2010 10 05 23 14 55 31.3200 -97.3300 251.000 122.0 134.459 3.970 -999.990 -999.990 1.345 ..P WKT 2010 10 05 23 19 55 31.3200 -97.3300 251.000 457.0 136.185 3.500 -999.990 -999.990 1.362 ..P WKT 2010 10 05 23 29 55 31.3200 -97.3300 251.000 30.0 131.037 3.870 -999.990 -999.990 1.310 ..P WKT 2010 10 05 23 34 55 31.3200 -97.3300 251.000 122.0 134.658 3.760 -999.990 -999.990 1.347 ..P WKT 2010 10 05 23 39 55 31.3200 -97.3300 251.000 457.0 132.147 3.260 -999.990 -999.990 1.321 ..P WKT 2010 10 05 23 44 55 31.3200 -97.3300 251.000 30.0 132.498 3.570 -999.990 -999.990 1.325 ..P WKT 2010 10 05 23 49 55 31.3200 -97.3300 251.000 122.0 136.527 3.450 -999.990 -999.990 1.365 ..P WKT 2010 10 06 00 09 55 31.3200 -97.3300 251.000 457.0 131.034 5.930 -999.990 -999.990 1.310 ..P WKT 2010 10 06 00 10 25 31.3200 -97.3300 251.000 457.0 138.105 4.090 -999.990 -999.990 1.381 ..P WKT 2010 10 06 00 10 55 31.3200 -97.3300 251.000 457.0 131.549 3.600 -999.990 -999.990 1.315 ..P WKT 2010 10 06 00 11 25 31.3200 -97.3300 251.000 457.0 126.902 3.330 -999.990 -999.990 1.269 ..P WKT 2010 10 06 00 11 55 31.3200 -97.3300 251.000 457.0 127.159 3.640 -999.990 -999.990 1.272 ..P WKT 2010 10 06 00 12 25 31.3200 -97.3300 251.000 457.0 122.511 3.580 -999.990 -999.990 1.225 ..P WKT 2010 10 06 00 12 55 31.3200 -97.3300 251.000 457.0 131.218 4.630 -999.990 -999.990 1.312 ..P WKT 2010 10 06 00 13 25 31.3200 -97.3300 251.000 457.0 128.478 4.180 -999.990 -999.990 1.285 ..P WKT 2010 10 06 00 13 55 31.3200 -97.3300 251.000 457.0 127.918 4.900 -999.990 -999.990 1.279 ..P WKT 2010 10 06 00 14 25 31.3200 -97.3300 251.000 457.0 134.444 3.680 -999.990 -999.990 1.344 ..P WKT 2010 10 06 00 14 55 31.3200 -97.3300 251.000 457.0 129.795 3.500 -999.990 -999.990 1.298 ..P WKT 2010 10 06 00 19 55 31.3200 -97.3300 251.000 30.0 132.100 3.410 -999.990 -999.990 1.321 ..P WKT 2010 10 06 00 24 55 31.3200 -97.3300 251.000 122.0 127.046 4.550 -999.990 -999.990 1.270 ..P WKT 2010 10 06 00 29 55 31.3200 -97.3300 251.000 457.0 132.622 3.430 -999.990 -999.990 1.326 ..P WKT 2010 10 06 00 34 55 31.3200 -97.3300 251.000 30.0 134.383 3.960 -999.990 -999.990 1.344 ..P WKT 2010 10 06 00 39 55 31.3200 -97.3300 251.000 122.0 128.781 4.580 -999.990 -999.990 1.288 ..P WKT 2010 10 06 00 44 55 31.3200 -97.3300 251.000 457.0 129.996 3.730 -999.990 -999.990 1.300 ..P WKT 2010 10 06 00 54 55 31.3200 -97.3300 251.000 30.0 134.799 3.880 -999.990 -999.990 1.348 ..P WKT 2010 10 06 00 59 55 31.3200 -97.3300 251.000 122.0 131.023 3.390 -999.990 -999.990 1.310 ..P WKT 2010 10 06 01 04 55 31.3200 -97.3300 251.000 457.0 133.792 4.070 -999.990 -999.990 1.338 ..P WKT 2010 10 06 01 09 55 31.3200 -97.3300 251.000 30.0 128.379 3.980 -999.990 -999.990 1.284 ..P WKT 2010 10 06 01 14 55 31.3200 -97.3300 251.000 122.0 138.242 3.570 -999.990 -999.990 1.382 ..P WKT 2010 10 06 01 19 55 31.3200 -97.3300 251.000 457.0 134.466 3.440 -999.990 -999.990 1.345 ..P WKT 2010 10 06 01 29 55 31.3200 -97.3300 251.000 30.0 132.835 3.270 -999.990 -999.990 1.328 ..P WKT 2010 10 06 01 34 55 31.3200 -97.3300 251.000 122.0 135.256 3.580 -999.990 -999.990 1.353 ..P WKT 2010 10 06 01 39 55 31.3200 -97.3300 251.000 457.0 134.675 3.940 -999.990 -999.990 1.347 ..P WKT 2010 10 06 01 44 55 31.3200 -97.3300 251.000 30.0 137.369 5.010 -999.990 -999.990 1.374 ..P WKT 2010 10 06 01 49 55 31.3200 -97.3300 251.000 122.0 134.604 3.810 -999.990 -999.990 1.346 ..P WKT 2010 10 06 01 54 55 31.3200 -97.3300 251.000 457.0 135.933 4.230 -999.990 -999.990 1.359 ..P WKT 2010 10 06 02 04 55 31.3200 -97.3300 251.000 30.0 131.650 4.830 -999.990 -999.990 1.317 ..P WKT 2010 10 06 02 09 55 31.3200 -97.3300 251.000 122.0 130.951 4.470 -999.990 -999.990 1.310 ..P WKT 2010 10 06 02 14 55 31.3200 -97.3300 251.000 457.0 131.754 4.630 -999.990 -999.990 1.318 ..P WKT 2010 10 06 02 19 55 31.3200 -97.3300 251.000 30.0 135.971 5.190 -999.990 -999.990 1.360 ..P WKT 2010 10 06 02 24 55 31.3200 -97.3300 251.000 122.0 131.449 3.790 -999.990 -999.990 1.314 ..P WKT 2010 10 06 02 29 55 31.3200 -97.3300 251.000 457.0 134.984 4.200 -999.990 -999.990 1.350 ..P WKT 2010 10 06 02 39 55 31.3200 -97.3300 251.000 30.0 137.821 3.450 -999.990 -999.990 1.378 ..P WKT 2010 10 06 02 44 55 31.3200 -97.3300 251.000 122.0 139.034 3.580 -999.990 -999.990 1.390 ..P WKT 2010 10 06 02 49 55 31.3200 -97.3300 251.000 457.0 141.751 3.730 -999.990 -999.990 1.418 ..P WKT 2010 10 06 02 54 55 31.3200 -97.3300 251.000 30.0 142.418 4.070 -999.990 -999.990 1.424 ..P WKT 2010 10 06 02 59 55 31.3200 -97.3300 251.000 122.0 143.087 3.730 -999.990 -999.990 1.431 ..P WKT 2010 10 06 03 04 55 31.3200 -97.3300 251.000 457.0 135.965 4.140 -999.990 -999.990 1.360 ..P WKT 2010 10 06 03 14 55 31.3200 -97.3300 251.000 30.0 149.543 5.110 -999.990 -999.990 1.495 ..P WKT 2010 10 06 03 19 55 31.3200 -97.3300 251.000 122.0 146.325 3.710 -999.990 -999.990 1.463 ..P WKT 2010 10 06 03 24 55 31.3200 -97.3300 251.000 457.0 139.007 3.620 -999.990 -999.990 1.390 ..P WKT 2010 10 06 03 29 55 31.3200 -97.3300 251.000 30.0 153.425 5.080 -999.990 -999.990 1.534 ..P WKT 2010 10 06 03 34 55 31.3200 -97.3300 251.000 122.0 155.949 4.280 -999.990 -999.990 1.559 ..P WKT 2010 10 06 03 39 55 31.3200 -97.3300 251.000 457.0 147.672 4.780 -999.990 -999.990 1.477 ..P WKT 2010 10 06 03 49 55 31.3200 -97.3300 251.000 30.0 148.170 4.310 -999.990 -999.990 1.482 ..P WKT 2010 10 06 03 54 55 31.3200 -97.3300 251.000 122.0 137.389 3.990 -999.990 -999.990 1.374 ..P WKT 2010 10 06 03 59 55 31.3200 -97.3300 251.000 457.0 188.980 4.190 -999.990 -999.990 1.890 ..P WKT 2010 10 06 04 04 55 31.3200 -97.3300 251.000 30.0 146.053 3.600 -999.990 -999.990 1.461 ..P WKT 2010 10 06 04 09 55 31.3200 -97.3300 251.000 122.0 173.986 3.780 -999.990 -999.990 1.740 ..P WKT 2010 10 06 04 14 55 31.3200 -97.3300 251.000 457.0 144.460 3.470 -999.990 -999.990 1.445 ..P WKT 2010 10 06 04 24 55 31.3200 -97.3300 251.000 30.0 162.786 3.790 -999.990 -999.990 1.628 ..P WKT 2010 10 06 04 29 55 31.3200 -97.3300 251.000 122.0 140.582 4.220 -999.990 -999.990 1.406 ..P WKT 2010 10 06 04 34 55 31.3200 -97.3300 251.000 457.0 138.358 3.630 -999.990 -999.990 1.384 ..P WKT 2010 10 06 04 39 55 31.3200 -97.3300 251.000 30.0 160.496 3.870 -999.990 -999.990 1.605 ..P WKT 2010 10 06 04 44 55 31.3200 -97.3300 251.000 122.0 137.466 4.240 -999.990 -999.990 1.375 ..P WKT 2010 10 06 04 49 55 31.3200 -97.3300 251.000 457.0 139.347 4.050 -999.990 -999.990 1.393 ..P WKT 2010 10 06 05 04 55 31.3200 -97.3300 251.000 30.0 143.634 4.510 -999.990 -999.990 1.436 ..P WKT 2010 10 06 05 09 55 31.3200 -97.3300 251.000 122.0 133.470 4.330 -999.990 -999.990 1.335 ..P WKT 2010 10 06 05 14 55 31.3200 -97.3300 251.000 457.0 137.548 4.180 -999.990 -999.990 1.375 ..P WKT 2010 10 06 05 19 55 31.3200 -97.3300 251.000 30.0 133.682 4.980 -999.990 -999.990 1.337 ..P WKT 2010 10 06 05 24 55 31.3200 -97.3300 251.000 122.0 123.241 4.490 -999.990 -999.990 1.232 ..P WKT 2010 10 06 05 29 55 31.3200 -97.3300 251.000 457.0 135.539 4.430 -999.990 -999.990 1.355 ..P WKT 2010 10 06 05 39 55 31.3200 -97.3300 251.000 30.0 133.397 4.590 -999.990 -999.990 1.334 ..P WKT 2010 10 06 05 44 55 31.3200 -97.3300 251.000 122.0 132.109 4.530 -999.990 -999.990 1.321 ..P WKT 2010 10 06 05 49 55 31.3200 -97.3300 251.000 457.0 137.398 4.370 -999.990 -999.990 1.374 ..P WKT 2010 10 06 05 54 55 31.3200 -97.3300 251.000 30.0 130.353 4.570 -999.990 -999.990 1.304 ..P WKT 2010 10 06 05 59 55 31.3200 -97.3300 251.000 122.0 132.354 4.810 -999.990 -999.990 1.324 ..P WKT 2010 10 06 06 04 55 31.3200 -97.3300 251.000 457.0 142.852 4.300 -999.990 -999.990 1.429 ..P WKT 2010 10 06 06 14 55 31.3200 -97.3300 251.000 30.0 130.973 4.450 -999.990 -999.990 1.310 ..P WKT 2010 10 06 06 19 55 31.3200 -97.3300 251.000 122.0 131.760 3.840 -999.990 -999.990 1.318 ..P WKT 2010 10 06 06 24 55 31.3200 -97.3300 251.000 457.0 136.386 3.940 -999.990 -999.990 1.364 ..P WKT 2010 10 06 06 29 55 31.3200 -97.3300 251.000 30.0 128.671 4.010 -999.990 -999.990 1.287 ..P WKT 2010 10 06 06 34 55 31.3200 -97.3300 251.000 122.0 125.344 3.650 -999.990 -999.990 1.253 ..P WKT 2010 10 06 06 39 55 31.3200 -97.3300 251.000 457.0 128.873 3.640 -999.990 -999.990 1.289 ..P WKT 2010 10 06 06 49 55 31.3200 -97.3300 251.000 30.0 145.967 5.470 -999.990 -999.990 1.460 ..P WKT 2010 10 06 06 54 55 31.3200 -97.3300 251.000 122.0 136.898 3.660 -999.990 -999.990 1.369 ..P WKT 2010 10 06 06 59 55 31.3200 -97.3300 251.000 457.0 136.608 4.210 -999.990 -999.990 1.366 ..P WKT 2010 10 06 07 04 55 31.3200 -97.3300 251.000 30.0 143.315 4.670 -999.990 -999.990 1.433 ..P WKT 2010 10 06 07 09 55 31.3200 -97.3300 251.000 122.0 143.849 6.380 -999.990 -999.990 1.438 ..P WKT 2010 10 06 07 14 55 31.3200 -97.3300 251.000 457.0 136.012 4.150 -999.990 -999.990 1.360 ..P WKT 2010 10 06 07 24 55 31.3200 -97.3300 251.000 30.0 143.980 4.870 -999.990 -999.990 1.440 ..P WKT 2010 10 06 07 29 55 31.3200 -97.3300 251.000 122.0 137.690 4.170 -999.990 -999.990 1.377 ..P WKT 2010 10 06 07 34 55 31.3200 -97.3300 251.000 457.0 128.103 4.410 -999.990 -999.990 1.281 ..P WKT 2010 10 06 07 39 55 31.3200 -97.3300 251.000 30.0 143.502 4.850 -999.990 -999.990 1.435 ..P WKT 2010 10 06 07 44 55 31.3200 -97.3300 251.000 122.0 124.442 4.200 -999.990 -999.990 1.244 ..P WKT 2010 10 06 07 49 55 31.3200 -97.3300 251.000 457.0 126.798 4.240 -999.990 -999.990 1.268 ..P WKT 2010 10 06 07 59 55 31.3200 -97.3300 251.000 30.0 134.906 3.770 -999.990 -999.990 1.349 ..P WKT 2010 10 06 08 04 55 31.3200 -97.3300 251.000 122.0 132.556 4.340 -999.990 -999.990 1.326 ..P WKT 2010 10 06 08 09 55 31.3200 -97.3300 251.000 457.0 131.853 4.590 -999.990 -999.990 1.319 ..P WKT 2010 10 06 08 14 55 31.3200 -97.3300 251.000 30.0 139.941 4.670 -999.990 -999.990 1.399 ..P WKT 2010 10 06 08 19 55 31.3200 -97.3300 251.000 122.0 133.743 3.880 -999.990 -999.990 1.337 ..P WKT 2010 10 06 08 24 55 31.3200 -97.3300 251.000 457.0 126.995 3.700 -999.990 -999.990 1.270 ..P WKT 2010 10 06 08 34 55 31.3200 -97.3300 251.000 30.0 138.230 3.690 -999.990 -999.990 1.382 ..P WKT 2010 10 06 08 39 55 31.3200 -97.3300 251.000 122.0 122.135 3.880 -999.990 -999.990 1.221 ..P WKT 2010 10 06 08 44 55 31.3200 -97.3300 251.000 457.0 127.752 4.270 -999.990 -999.990 1.278 ..P WKT 2010 10 06 08 49 55 31.3200 -97.3300 251.000 30.0 143.543 3.950 -999.990 -999.990 1.435 ..P WKT 2010 10 06 08 54 55 31.3200 -97.3300 251.000 122.0 140.916 3.810 -999.990 -999.990 1.409 ..P WKT 2010 10 06 08 59 55 31.3200 -97.3300 251.000 457.0 132.239 3.970 -999.990 -999.990 1.322 ..P WKT 2010 10 06 09 09 55 31.3200 -97.3300 251.000 30.0 140.731 4.000 -999.990 -999.990 1.407 ..P WKT 2010 10 06 09 14 55 31.3200 -97.3300 251.000 122.0 130.953 3.960 -999.990 -999.990 1.310 ..P WKT 2010 10 06 09 19 55 31.3200 -97.3300 251.000 457.0 128.324 4.100 -999.990 -999.990 1.283 ..P WKT 2010 10 06 09 24 55 31.3200 -97.3300 251.000 30.0 140.822 4.060 -999.990 -999.990 1.408 ..P WKT 2010 10 06 09 29 55 31.3200 -97.3300 251.000 122.0 138.469 4.410 -999.990 -999.990 1.385 ..P WKT 2010 10 06 09 34 55 31.3200 -97.3300 251.000 457.0 133.914 4.180 -999.990 -999.990 1.339 ..P WKT 2010 10 06 09 44 55 31.3200 -97.3300 251.000 30.0 142.863 5.190 -999.990 -999.990 1.429 ..P WKT 2010 10 06 09 49 55 31.3200 -97.3300 251.000 122.0 135.182 4.330 -999.990 -999.990 1.352 ..P WKT 2010 10 06 09 54 55 31.3200 -97.3300 251.000 457.0 133.417 4.150 -999.990 -999.990 1.334 ..P WKT 2010 10 06 09 59 55 31.3200 -97.3300 251.000 30.0 143.623 4.300 -999.990 -999.990 1.436 ..P WKT 2010 10 06 10 04 55 31.3200 -97.3300 251.000 122.0 133.600 4.600 -999.990 -999.990 1.336 ..P WKT 2010 10 06 10 09 55 31.3200 -97.3300 251.000 457.0 127.431 3.930 -999.990 -999.990 1.274 ..P WKT 2010 10 06 10 19 55 31.3200 -97.3300 251.000 30.0 145.843 4.490 -999.990 -999.990 1.458 ..P WKT 2010 10 06 10 24 55 31.3200 -97.3300 251.000 122.0 134.775 4.130 -999.990 -999.990 1.348 ..P WKT 2010 10 06 10 29 55 31.3200 -97.3300 251.000 457.0 130.727 4.930 -999.990 -999.990 1.307 ..P WKT 2010 10 06 10 34 55 31.3200 -97.3300 251.000 30.0 147.608 4.260 -999.990 -999.990 1.476 ..P WKT 2010 10 06 10 39 55 31.3200 -97.3300 251.000 122.0 137.226 5.620 -999.990 -999.990 1.372 ..P WKT 2010 10 06 10 44 55 31.3200 -97.3300 251.000 457.0 128.769 4.260 -999.990 -999.990 1.288 ..P WKT 2010 10 06 10 54 55 31.3200 -97.3300 251.000 30.0 150.027 4.570 -999.990 -999.990 1.500 ..P WKT 2010 10 06 10 59 55 31.3200 -97.3300 251.000 122.0 135.528 4.600 -999.990 -999.990 1.355 ..P WKT 2010 10 06 11 04 55 31.3200 -97.3300 251.000 457.0 127.503 4.980 -999.990 -999.990 1.275 ..P WKT 2010 10 06 11 09 55 31.3200 -97.3300 251.000 30.0 140.692 4.680 -999.990 -999.990 1.407 ..P WKT 2010 10 06 11 14 55 31.3200 -97.3300 251.000 122.0 127.429 4.790 -999.990 -999.990 1.274 ..P WKT 2010 10 06 11 19 55 31.3200 -97.3300 251.000 457.0 128.220 4.990 -999.990 -999.990 1.282 ..P WKT 2010 10 06 11 29 55 31.3200 -97.3300 251.000 30.0 141.349 5.140 -999.990 -999.990 1.413 ..P WKT 2010 10 06 11 34 55 31.3200 -97.3300 251.000 122.0 132.738 5.170 -999.990 -999.990 1.327 ..P WKT 2010 10 06 11 39 55 31.3200 -97.3300 251.000 457.0 135.291 4.890 -999.990 -999.990 1.353 ..P WKT 2010 10 06 11 44 55 31.3200 -97.3300 251.000 30.0 143.911 4.490 -999.990 -999.990 1.439 ..P WKT 2010 10 06 11 49 55 31.3200 -97.3300 251.000 122.0 134.609 4.540 -999.990 -999.990 1.346 ..P WKT 2010 10 06 12 09 55 31.3200 -97.3300 251.000 457.0 129.778 4.010 -999.990 -999.990 1.298 ..P WKT 2010 10 06 12 10 25 31.3200 -97.3300 251.000 457.0 136.404 4.150 -999.990 -999.990 1.364 ..P WKT 2010 10 06 12 10 55 31.3200 -97.3300 251.000 457.0 133.379 3.910 -999.990 -999.990 1.334 ..P WKT 2010 10 06 12 11 25 31.3200 -97.3300 251.000 457.0 125.114 4.110 -999.990 -999.990 1.251 ..P WKT 2010 10 06 12 11 55 31.3200 -97.3300 251.000 457.0 131.464 3.970 -999.990 -999.990 1.315 ..P WKT 2010 10 06 12 12 25 31.3200 -97.3300 251.000 457.0 136.159 4.400 -999.990 -999.990 1.362 ..P WKT 2010 10 06 12 12 55 31.3200 -97.3300 251.000 457.0 135.064 4.420 -999.990 -999.990 1.351 ..P WKT 2010 10 06 12 13 25 31.3200 -97.3300 251.000 457.0 133.141 3.920 -999.990 -999.990 1.331 ..P WKT 2010 10 06 12 13 55 31.3200 -97.3300 251.000 457.0 133.425 4.040 -999.990 -999.990 1.334 ..P WKT 2010 10 06 12 14 25 31.3200 -97.3300 251.000 457.0 136.190 4.300 -999.990 -999.990 1.362 ..P WKT 2010 10 06 12 14 55 31.3200 -97.3300 251.000 457.0 132.614 4.810 -999.990 -999.990 1.326 ..P WKT 2010 10 06 12 19 55 31.3200 -97.3300 251.000 30.0 138.756 4.170 -999.990 -999.990 1.388 ..P WKT 2010 10 06 12 24 55 31.3200 -97.3300 251.000 122.0 130.562 4.370 -999.990 -999.990 1.306 ..P WKT 2010 10 06 12 29 55 31.3200 -97.3300 251.000 457.0 152.696 6.090 -999.990 -999.990 1.527 ..P WKT 2010 10 06 12 34 55 31.3200 -97.3300 251.000 30.0 139.814 4.430 -999.990 -999.990 1.398 ..P WKT 2010 10 06 12 39 55 31.3200 -97.3300 251.000 122.0 131.620 4.210 -999.990 -999.990 1.316 ..P WKT 2010 10 06 12 44 55 31.3200 -97.3300 251.000 457.0 128.941 4.200 -999.990 -999.990 1.289 ..P WKT 2010 10 06 12 54 55 31.3200 -97.3300 251.000 30.0 144.480 4.460 -999.990 -999.990 1.445 ..P WKT 2010 10 06 12 59 55 31.3200 -97.3300 251.000 122.0 136.234 4.440 -999.990 -999.990 1.362 ..P WKT 2010 10 06 13 04 55 31.3200 -97.3300 251.000 457.0 132.676 4.800 -999.990 -999.990 1.327 ..P WKT 2010 10 06 13 09 55 31.3200 -97.3300 251.000 30.0 149.237 4.980 -999.990 -999.990 1.492 ..P WKT 2010 10 06 13 14 55 31.3200 -97.3300 251.000 122.0 141.544 4.950 -999.990 -999.990 1.415 ..P WKT 2010 10 06 13 19 55 31.3200 -97.3300 251.000 457.0 135.781 4.930 -999.990 -999.990 1.358 ..P WKT 2010 10 06 13 29 55 31.3200 -97.3300 251.000 30.0 153.820 4.760 -999.990 -999.990 1.538 ..P WKT 2010 10 06 13 34 55 31.3200 -97.3300 251.000 122.0 146.758 4.850 -999.990 -999.990 1.468 ..P WKT 2010 10 06 13 39 55 31.3200 -97.3300 251.000 457.0 124.955 4.620 -999.990 -999.990 1.250 ..P WKT 2010 10 06 13 44 55 31.3200 -97.3300 251.000 30.0 162.393 4.720 -999.990 -999.990 1.624 ..P WKT 2010 10 06 13 49 55 31.3200 -97.3300 251.000 122.0 144.036 4.910 -999.990 -999.990 1.440 ..P WKT 2010 10 06 13 54 55 31.3200 -97.3300 251.000 457.0 126.231 4.360 -999.990 -999.990 1.262 ..P WKT 2010 10 06 14 04 55 31.3200 -97.3300 251.000 30.0 166.620 4.770 -999.990 -999.990 1.666 ..P WKT 2010 10 06 14 09 55 31.3200 -97.3300 251.000 122.0 148.638 4.820 -999.990 -999.990 1.486 ..P WKT 2010 10 06 14 14 55 31.3200 -97.3300 251.000 457.0 125.838 5.220 -999.990 -999.990 1.258 ..P WKT 2010 10 06 14 19 55 31.3200 -97.3300 251.000 30.0 189.119 5.650 -999.990 -999.990 1.891 ..P WKT 2010 10 06 14 24 55 31.3200 -97.3300 251.000 122.0 146.074 4.690 -999.990 -999.990 1.461 ..P WKT 2010 10 06 14 29 55 31.3200 -97.3300 251.000 457.0 127.270 4.890 -999.990 -999.990 1.273 ..P WKT 2010 10 06 14 39 55 31.3200 -97.3300 251.000 30.0 189.384 6.250 -999.990 -999.990 1.894 ..P WKT 2010 10 06 14 44 55 31.3200 -97.3300 251.000 122.0 146.780 4.900 -999.990 -999.990 1.468 ..P WKT 2010 10 06 14 49 55 31.3200 -97.3300 251.000 457.0 124.281 4.590 -999.990 -999.990 1.243 ..P WKT 2010 10 06 14 54 55 31.3200 -97.3300 251.000 30.0 172.418 5.010 -999.990 -999.990 1.724 ..P WKT 2010 10 06 14 59 55 31.3200 -97.3300 251.000 122.0 146.065 4.930 -999.990 -999.990 1.461 ..P WKT 2010 10 06 15 04 55 31.3200 -97.3300 251.000 457.0 123.982 4.880 -999.990 -999.990 1.240 ..P WKT 2010 10 06 15 14 55 31.3200 -97.3300 251.000 30.0 149.736 6.040 -999.990 -999.990 1.497 ..P WKT 2010 10 06 15 19 55 31.3200 -97.3300 251.000 122.0 147.872 6.220 -999.990 -999.990 1.479 ..P WKT 2010 10 06 15 24 55 31.3200 -97.3300 251.000 457.0 121.368 6.440 -999.990 -999.990 1.214 ..P WKT 2010 10 06 15 29 55 31.3200 -97.3300 251.000 30.0 145.521 6.530 -999.990 -999.990 1.455 ..P WKT 2010 10 06 15 34 55 31.3200 -97.3300 251.000 122.0 145.171 6.290 -999.990 -999.990 1.452 ..P WKT 2010 10 06 15 39 55 31.3200 -97.3300 251.000 457.0 121.287 6.700 -999.990 -999.990 1.213 ..P WKT 2010 10 06 15 49 55 31.3200 -97.3300 251.000 30.0 134.981 6.650 -999.990 -999.990 1.350 ..P WKT 2010 10 06 15 54 55 31.3200 -97.3300 251.000 122.0 146.132 6.020 -999.990 -999.990 1.461 ..P WKT 2010 10 06 15 59 55 31.3200 -97.3300 251.000 457.0 130.587 5.940 -999.990 -999.990 1.306 ..P WKT 2010 10 06 16 04 55 31.3200 -97.3300 251.000 30.0 137.060 5.690 -999.990 -999.990 1.371 ..P WKT 2010 10 06 16 09 55 31.3200 -97.3300 251.000 122.0 130.597 5.090 -999.990 -999.990 1.306 ..P WKT 2010 10 06 16 14 55 31.3200 -97.3300 251.000 457.0 138.720 4.920 -999.990 -999.990 1.387 ..P WKT 2010 10 06 16 24 55 31.3200 -97.3300 251.000 30.0 131.261 4.560 -999.990 -999.990 1.313 ..P WKT 2010 10 06 16 29 55 31.3200 -97.3300 251.000 122.0 137.142 4.950 -999.990 -999.990 1.371 ..P WKT 2010 10 06 16 34 55 31.3200 -97.3300 251.000 457.0 137.245 5.320 -999.990 -999.990 1.372 ..P WKT 2010 10 06 16 39 55 31.3200 -97.3300 251.000 30.0 133.496 5.030 -999.990 -999.990 1.335 ..P WKT 2010 10 06 16 44 55 31.3200 -97.3300 251.000 122.0 136.075 4.860 -999.990 -999.990 1.361 ..P WKT 2010 10 06 16 49 55 31.3200 -97.3300 251.000 457.0 133.702 4.550 -999.990 -999.990 1.337 ..P WKT 2010 10 06 17 04 55 31.3200 -97.3300 251.000 30.0 134.085 5.530 -999.990 -999.990 1.341 ..P WKT 2010 10 06 17 09 55 31.3200 -97.3300 251.000 122.0 137.389 5.080 -999.990 -999.990 1.374 ..P WKT 2010 10 06 17 14 55 31.3200 -97.3300 251.000 457.0 138.491 5.160 -999.990 -999.990 1.385 ..P WKT 2010 10 06 17 19 55 31.3200 -97.3300 251.000 30.0 137.393 4.700 -999.990 -999.990 1.374 ..P WKT 2010 10 06 17 24 55 31.3200 -97.3300 251.000 122.0 140.971 4.860 -999.990 -999.990 1.410 ..P WKT 2010 10 06 17 29 55 31.3200 -97.3300 251.000 457.0 142.623 4.840 -999.990 -999.990 1.426 ..P WKT 2010 10 06 17 39 55 31.3200 -97.3300 251.000 30.0 142.060 4.950 -999.990 -999.990 1.421 ..P WKT 2010 10 06 17 44 55 31.3200 -97.3300 251.000 122.0 144.795 5.450 -999.990 -999.990 1.448 ..P WKT 2010 10 06 17 49 55 31.3200 -97.3300 251.000 457.0 141.755 5.080 -999.990 -999.990 1.418 ..P WKT 2010 10 06 17 54 55 31.3200 -97.3300 251.000 30.0 145.314 5.060 -999.990 -999.990 1.453 ..P WKT 2010 10 06 17 59 55 31.3200 -97.3300 251.000 122.0 146.949 4.830 -999.990 -999.990 1.469 ..P WKT 2010 10 06 18 04 55 31.3200 -97.3300 251.000 457.0 142.947 5.160 -999.990 -999.990 1.429 ..P WKT 2010 10 06 18 14 55 31.3200 -97.3300 251.000 30.0 139.342 5.170 -999.990 -999.990 1.393 ..P WKT 2010 10 06 18 19 55 31.3200 -97.3300 251.000 122.0 143.589 4.710 -999.990 -999.990 1.436 ..P WKT 2010 10 06 18 24 55 31.3200 -97.3300 251.000 457.0 141.375 5.840 -999.990 -999.990 1.414 ..P WKT 2010 10 06 18 29 55 31.3200 -97.3300 251.000 30.0 138.336 4.740 -999.990 -999.990 1.383 ..P WKT 2010 10 06 18 34 55 31.3200 -97.3300 251.000 122.0 143.268 5.420 -999.990 -999.990 1.433 ..P WKT 2010 10 06 18 39 55 31.3200 -97.3300 251.000 457.0 137.893 4.940 -999.990 -999.990 1.379 ..P WKT 2010 10 06 18 49 55 31.3200 -97.3300 251.000 30.0 138.237 4.730 -999.990 -999.990 1.382 ..P WKT 2010 10 06 18 54 55 31.3200 -97.3300 251.000 122.0 138.183 5.270 -999.990 -999.990 1.382 ..P WKT 2010 10 06 18 59 55 31.3200 -97.3300 251.000 457.0 132.494 5.020 -999.990 -999.990 1.325 ..P WKT 2010 10 06 19 04 55 31.3200 -97.3300 251.000 30.0 127.357 5.340 -999.990 -999.990 1.274 ..P WKT 2010 10 06 19 09 55 31.3200 -97.3300 251.000 122.0 137.882 5.280 -999.990 -999.990 1.379 ..P WKT 2010 10 06 19 14 55 31.3200 -97.3300 251.000 457.0 134.393 5.300 -999.990 -999.990 1.344 ..P WKT 2010 10 06 19 24 55 31.3200 -97.3300 251.000 30.0 129.713 5.200 -999.990 -999.990 1.297 ..P WKT 2010 10 06 19 29 55 31.3200 -97.3300 251.000 122.0 137.587 5.650 -999.990 -999.990 1.376 ..P WKT 2010 10 06 19 34 55 31.3200 -97.3300 251.000 457.0 128.154 5.180 -999.990 -999.990 1.282 ..P WKT 2010 10 06 19 39 55 31.3200 -97.3300 251.000 30.0 132.593 5.000 -999.990 -999.990 1.326 ..P WKT 2010 10 06 19 44 55 31.3200 -97.3300 251.000 122.0 133.736 4.970 -999.990 -999.990 1.337 ..P WKT 2010 10 06 19 49 55 31.3200 -97.3300 251.000 457.0 142.844 5.010 -999.990 -999.990 1.428 ..P WKT 2010 10 06 19 59 55 31.3200 -97.3300 251.000 30.0 131.769 5.040 -999.990 -999.990 1.318 ..P WKT 2010 10 06 20 04 55 31.3200 -97.3300 251.000 122.0 132.186 5.160 -999.990 -999.990 1.322 ..P WKT 2010 10 06 20 09 55 31.3200 -97.3300 251.000 457.0 131.779 5.420 -999.990 -999.990 1.318 ..P WKT 2010 10 06 20 14 55 31.3200 -97.3300 251.000 30.0 122.309 5.260 -999.990 -999.990 1.223 ..P WKT 2010 10 06 20 19 55 31.3200 -97.3300 251.000 122.0 126.022 5.620 -999.990 -999.990 1.260 ..P WKT 2010 10 06 20 24 55 31.3200 -97.3300 251.000 457.0 127.262 5.440 -999.990 -999.990 1.273 ..P WKT 2010 10 06 20 34 55 31.3200 -97.3300 251.000 30.0 122.565 4.980 -999.990 -999.990 1.226 ..P WKT 2010 10 06 20 39 55 31.3200 -97.3300 251.000 122.0 128.435 5.330 -999.990 -999.990 1.284 ..P WKT 2010 10 06 20 44 55 31.3200 -97.3300 251.000 457.0 124.420 5.590 -999.990 -999.990 1.244 ..P WKT 2010 10 06 20 49 55 31.3200 -97.3300 251.000 30.0 128.641 6.290 -999.990 -999.990 1.286 ..P WKT 2010 10 06 20 54 55 31.3200 -97.3300 251.000 122.0 133.411 5.240 -999.990 -999.990 1.334 ..P WKT 2010 10 06 20 59 55 31.3200 -97.3300 251.000 457.0 133.789 5.290 -999.990 -999.990 1.338 ..P WKT 2010 10 06 21 09 55 31.3200 -97.3300 251.000 30.0 124.407 5.170 -999.990 -999.990 1.244 ..P WKT 2010 10 06 21 14 55 31.3200 -97.3300 251.000 122.0 127.824 5.750 -999.990 -999.990 1.278 ..P WKT 2010 10 06 21 19 55 31.3200 -97.3300 251.000 457.0 130.691 5.560 -999.990 -999.990 1.307 ..P WKT 2010 10 06 21 24 55 31.3200 -97.3300 251.000 30.0 125.599 5.440 -999.990 -999.990 1.256 ..P WKT 2010 10 06 21 29 55 31.3200 -97.3300 251.000 122.0 129.290 5.130 -999.990 -999.990 1.293 ..P WKT 2010 10 06 21 34 55 31.3200 -97.3300 251.000 457.0 129.824 5.330 -999.990 -999.990 1.298 ..P WKT 2010 10 06 21 44 55 31.3200 -97.3300 251.000 30.0 130.599 5.510 -999.990 -999.990 1.306 ..P WKT 2010 10 06 21 49 55 31.3200 -97.3300 251.000 122.0 128.095 5.860 -999.990 -999.990 1.281 ..P WKT 2010 10 06 21 54 55 31.3200 -97.3300 251.000 457.0 125.180 5.470 -999.990 -999.990 1.252 ..P WKT 2010 10 06 21 59 55 31.3200 -97.3300 251.000 30.0 127.341 5.630 -999.990 -999.990 1.273 ..P WKT 2010 10 06 22 04 55 31.3200 -97.3300 251.000 122.0 127.444 5.730 -999.990 -999.990 1.274 ..P WKT 2010 10 06 22 09 55 31.3200 -97.3300 251.000 457.0 123.021 5.500 -999.990 -999.990 1.230 ..P WKT 2010 10 06 22 19 55 31.3200 -97.3300 251.000 30.0 123.913 5.690 -999.990 -999.990 1.239 ..P WKT 2010 10 06 22 24 55 31.3200 -97.3300 251.000 122.0 134.304 5.320 -999.990 -999.990 1.343 ..P WKT 2010 10 06 22 29 55 31.3200 -97.3300 251.000 457.0 128.371 6.170 -999.990 -999.990 1.284 ..P WKT 2010 10 06 22 34 55 31.3200 -97.3300 251.000 30.0 127.789 5.200 -999.990 -999.990 1.278 ..P WKT 2010 10 06 22 39 55 31.3200 -97.3300 251.000 122.0 131.595 5.440 -999.990 -999.990 1.316 ..P WKT 2010 10 06 22 44 55 31.3200 -97.3300 251.000 457.0 134.715 5.160 -999.990 -999.990 1.347 ..P WKT 2010 10 06 22 54 55 31.3200 -97.3300 251.000 30.0 127.849 5.990 -999.990 -999.990 1.278 ..P WKT 2010 10 06 22 59 55 31.3200 -97.3300 251.000 122.0 128.970 5.300 -999.990 -999.990 1.290 ..P WKT 2010 10 06 23 04 55 31.3200 -97.3300 251.000 457.0 130.091 6.070 -999.990 -999.990 1.301 ..P WKT 2010 10 06 23 09 55 31.3200 -97.3300 251.000 30.0 125.317 5.430 -999.990 -999.990 1.253 ..P WKT 2010 10 06 23 14 55 31.3200 -97.3300 251.000 122.0 124.108 5.350 -999.990 -999.990 1.241 ..P WKT 2010 10 06 23 19 55 31.3200 -97.3300 251.000 457.0 127.149 5.860 -999.990 -999.990 1.271 ..P WKT 2010 10 06 23 29 55 31.3200 -97.3300 251.000 30.0 133.363 5.340 -999.990 -999.990 1.334 ..P WKT 2010 10 06 23 34 55 31.3200 -97.3300 251.000 122.0 129.955 5.320 -999.990 -999.990 1.300 ..P WKT 2010 10 06 23 39 55 31.3200 -97.3300 251.000 457.0 125.177 5.340 -999.990 -999.990 1.252 ..P WKT 2010 10 06 23 44 55 31.3200 -97.3300 251.000 30.0 128.623 5.570 -999.990 -999.990 1.286 ..P WKT 2010 10 06 23 49 55 31.3200 -97.3300 251.000 122.0 128.780 5.730 -999.990 -999.990 1.288 ..P WKT 2010 10 07 00 09 55 31.3200 -97.3300 251.000 457.0 125.683 5.690 -999.990 -999.990 1.257 ..P WKT 2010 10 07 00 10 25 31.3200 -97.3300 251.000 457.0 128.147 6.010 -999.990 -999.990 1.281 ..P WKT 2010 10 07 00 10 55 31.3200 -97.3300 251.000 457.0 130.884 5.610 -999.990 -999.990 1.309 ..P WKT 2010 10 07 00 11 25 31.3200 -97.3300 251.000 457.0 130.059 5.640 -999.990 -999.990 1.301 ..P WKT 2010 10 07 00 11 55 31.3200 -97.3300 251.000 457.0 128.960 5.770 -999.990 -999.990 1.290 ..P WKT 2010 10 07 00 12 25 31.3200 -97.3300 251.000 457.0 128.135 5.690 -999.990 -999.990 1.281 ..P WKT 2010 10 07 00 12 55 31.3200 -97.3300 251.000 457.0 128.405 5.630 -999.990 -999.990 1.284 ..P WKT 2010 10 07 00 13 25 31.3200 -97.3300 251.000 457.0 124.565 5.640 -999.990 -999.990 1.246 ..P WKT 2010 10 07 00 13 55 31.3200 -97.3300 251.000 457.0 126.755 5.710 -999.990 -999.990 1.268 ..P WKT 2010 10 07 00 14 25 31.3200 -97.3300 251.000 457.0 124.011 5.630 -999.990 -999.990 1.240 ..P WKT 2010 10 07 00 14 55 31.3200 -97.3300 251.000 457.0 130.860 6.520 -999.990 -999.990 1.309 ..P WKT 2010 10 07 00 19 55 31.3200 -97.3300 251.000 30.0 126.718 5.680 -999.990 -999.990 1.267 ..P WKT 2010 10 07 00 24 55 31.3200 -97.3300 251.000 122.0 129.153 6.010 -999.990 -999.990 1.292 ..P WKT 2010 10 07 00 29 55 31.3200 -97.3300 251.000 457.0 127.752 5.540 -999.990 -999.990 1.278 ..P WKT 2010 10 07 00 34 55 31.3200 -97.3300 251.000 30.0 123.337 5.530 -999.990 -999.990 1.233 ..P WKT 2010 10 07 00 39 55 31.3200 -97.3300 251.000 122.0 129.335 5.580 -999.990 -999.990 1.293 ..P WKT 2010 10 07 00 44 55 31.3200 -97.3300 251.000 457.0 123.002 5.860 -999.990 -999.990 1.230 ..P WKT 2010 10 07 00 54 55 31.3200 -97.3300 251.000 30.0 122.717 5.780 -999.990 -999.990 1.227 ..P WKT 2010 10 07 00 59 55 31.3200 -97.3300 251.000 122.0 119.723 5.800 -999.990 -999.990 1.197 ..P WKT 2010 10 07 01 04 55 31.3200 -97.3300 251.000 457.0 127.139 5.440 -999.990 -999.990 1.271 ..P WKT 2010 10 07 01 09 55 31.3200 -97.3300 251.000 30.0 123.050 5.470 -999.990 -999.990 1.230 ..P WKT 2010 10 07 01 14 55 31.3200 -97.3300 251.000 122.0 117.590 5.440 -999.990 -999.990 1.176 ..P WKT 2010 10 07 01 19 55 31.3200 -97.3300 251.000 457.0 115.281 6.250 -999.990 -999.990 1.153 ..P WKT 2010 10 07 01 29 55 31.3200 -97.3300 251.000 30.0 116.025 5.220 -999.990 -999.990 1.160 ..P WKT 2010 10 07 01 34 55 31.3200 -97.3300 251.000 122.0 119.077 5.320 -999.990 -999.990 1.191 ..P WKT 2010 10 07 01 39 55 31.3200 -97.3300 251.000 457.0 112.132 5.460 -999.990 -999.990 1.121 ..P WKT 2010 10 07 01 44 55 31.3200 -97.3300 251.000 30.0 113.951 6.310 -999.990 -999.990 1.140 ..P WKT 2010 10 07 01 49 55 31.3200 -97.3300 251.000 122.0 124.397 5.770 -999.990 -999.990 1.244 ..P WKT 2010 10 07 01 54 55 31.3200 -97.3300 251.000 457.0 119.233 6.250 -999.990 -999.990 1.192 ..P WKT 2010 10 07 02 04 55 31.3200 -97.3300 251.000 30.0 118.020 5.300 -999.990 -999.990 1.180 ..P WKT 2010 10 07 02 09 55 31.3200 -97.3300 251.000 122.0 117.590 5.230 -999.990 -999.990 1.176 ..P WKT 2010 10 07 02 14 55 31.3200 -97.3300 251.000 457.0 115.243 5.530 -999.990 -999.990 1.152 ..P WKT 2010 10 07 02 19 55 31.3200 -97.3300 251.000 30.0 121.111 5.890 -999.990 -999.990 1.211 ..P WKT 2010 10 07 02 24 55 31.3200 -97.3300 251.000 122.0 120.132 5.530 -999.990 -999.990 1.201 ..P WKT 2010 10 07 02 29 55 31.3200 -97.3300 251.000 457.0 116.828 5.040 -999.990 -999.990 1.168 ..P WKT 2010 10 07 02 39 55 31.3200 -97.3300 251.000 30.0 121.658 5.070 -999.990 -999.990 1.217 ..P WKT 2010 10 07 02 44 55 31.3200 -97.3300 251.000 122.0 123.085 5.880 -999.990 -999.990 1.231 ..P WKT 2010 10 07 02 49 55 31.3200 -97.3300 251.000 457.0 126.155 5.490 -999.990 -999.990 1.262 ..P WKT 2010 10 07 02 54 55 31.3200 -97.3300 251.000 30.0 117.042 5.970 -999.990 -999.990 1.170 ..P WKT 2010 10 07 02 59 55 31.3200 -97.3300 251.000 122.0 117.923 6.030 -999.990 -999.990 1.179 ..P WKT 2010 10 07 03 04 55 31.3200 -97.3300 251.000 457.0 122.360 6.540 -999.990 -999.990 1.224 ..P WKT 2010 10 07 03 14 55 31.3200 -97.3300 251.000 30.0 107.347 7.800 -999.990 -999.990 1.073 ..P WKT 2010 10 07 03 19 55 31.3200 -97.3300 251.000 122.0 119.643 6.190 -999.990 -999.990 1.196 ..P WKT 2010 10 07 03 24 55 31.3200 -97.3300 251.000 457.0 122.496 6.290 -999.990 -999.990 1.225 ..P WKT 2010 10 07 03 29 55 31.3200 -97.3300 251.000 30.0 118.783 5.820 -999.990 -999.990 1.188 ..P WKT 2010 10 07 03 34 55 31.3200 -97.3300 251.000 122.0 114.248 5.630 -999.990 -999.990 1.142 ..P WKT 2010 10 07 03 39 55 31.3200 -97.3300 251.000 457.0 111.629 5.540 -999.990 -999.990 1.116 ..P WKT 2010 10 07 03 49 55 31.3200 -97.3300 251.000 30.0 118.235 5.420 -999.990 -999.990 1.182 ..P WKT 2010 10 07 03 54 55 31.3200 -97.3300 251.000 122.0 114.326 6.580 -999.990 -999.990 1.143 ..P WKT 2010 10 07 03 59 55 31.3200 -97.3300 251.000 457.0 127.928 7.040 -999.990 -999.990 1.279 ..P WKT 2010 10 07 04 04 55 31.3200 -97.3300 251.000 30.0 116.086 5.810 -999.990 -999.990 1.161 ..P WKT 2010 10 07 04 09 55 31.3200 -97.3300 251.000 122.0 120.385 6.230 -999.990 -999.990 1.204 ..P WKT 2010 10 07 04 14 55 31.3200 -97.3300 251.000 457.0 127.419 5.270 -999.990 -999.990 1.274 ..P WKT 2010 10 07 04 24 55 31.3200 -97.3300 251.000 30.0 120.541 5.620 -999.990 -999.990 1.205 ..P WKT 2010 10 07 04 29 55 31.3200 -97.3300 251.000 122.0 114.015 5.650 -999.990 -999.990 1.140 ..P WKT 2010 10 07 04 34 55 31.3200 -97.3300 251.000 457.0 121.986 6.370 -999.990 -999.990 1.220 ..P WKT 2010 10 07 04 39 55 31.3200 -97.3300 251.000 30.0 115.735 5.360 -999.990 -999.990 1.157 ..P WKT 2010 10 07 04 44 55 31.3200 -97.3300 251.000 122.0 114.953 5.680 -999.990 -999.990 1.150 ..P WKT 2010 10 07 04 49 55 31.3200 -97.3300 251.000 457.0 118.274 5.460 -999.990 -999.990 1.183 ..P WKT 2010 10 07 05 04 55 31.3200 -97.3300 251.000 30.0 119.783 5.160 -999.990 -999.990 1.198 ..P WKT 2010 10 07 05 09 55 31.3200 -97.3300 251.000 122.0 122.979 5.930 -999.990 -999.990 1.230 ..P WKT 2010 10 07 05 14 55 31.3200 -97.3300 251.000 457.0 114.963 5.360 -999.990 -999.990 1.150 ..P WKT 2010 10 07 05 19 55 31.3200 -97.3300 251.000 30.0 118.296 5.080 -999.990 -999.990 1.183 ..P WKT 2010 10 07 05 24 55 31.3200 -97.3300 251.000 122.0 117.391 5.520 -999.990 -999.990 1.174 ..P WKT 2010 10 07 05 29 55 31.3200 -97.3300 251.000 457.0 115.391 5.390 -999.990 -999.990 1.154 ..P WKT 2010 10 07 05 39 55 31.3200 -97.3300 251.000 30.0 122.257 5.320 -999.990 -999.990 1.223 ..P WKT 2010 10 07 05 44 55 31.3200 -97.3300 251.000 122.0 120.188 5.420 -999.990 -999.990 1.202 ..P WKT 2010 10 07 05 49 55 31.3200 -97.3300 251.000 457.0 121.808 5.630 -999.990 -999.990 1.218 ..P WKT 2010 10 07 05 54 55 31.3200 -97.3300 251.000 30.0 134.226 6.650 -999.990 -999.990 1.342 ..P WKT 2010 10 07 05 59 55 31.3200 -97.3300 251.000 122.0 121.222 5.800 -999.990 -999.990 1.212 ..P WKT 2010 10 07 06 04 55 31.3200 -97.3300 251.000 457.0 124.209 5.890 -999.990 -999.990 1.242 ..P WKT 2010 10 07 06 14 55 31.3200 -97.3300 251.000 30.0 127.528 5.970 -999.990 -999.990 1.275 ..P WKT 2010 10 07 06 19 55 31.3200 -97.3300 251.000 122.0 115.151 6.100 -999.990 -999.990 1.152 ..P WKT 2010 10 07 06 24 55 31.3200 -97.3300 251.000 457.0 116.303 7.030 -999.990 -999.990 1.163 ..P WKT 2010 10 07 06 29 55 31.3200 -97.3300 251.000 30.0 125.789 5.780 -999.990 -999.990 1.258 ..P WKT 2010 10 07 06 34 55 31.3200 -97.3300 251.000 122.0 122.432 5.630 -999.990 -999.990 1.224 ..P WKT 2010 10 07 06 39 55 31.3200 -97.3300 251.000 457.0 122.080 5.880 -999.990 -999.990 1.221 ..P WKT 2010 10 07 06 49 55 31.3200 -97.3300 251.000 30.0 129.321 5.600 -999.990 -999.990 1.293 ..P WKT 2010 10 07 06 54 55 31.3200 -97.3300 251.000 122.0 137.322 6.120 -999.990 -999.990 1.373 ..P WKT 2010 10 07 06 59 55 31.3200 -97.3300 251.000 457.0 121.416 5.540 -999.990 -999.990 1.214 ..P WKT 2010 10 07 07 04 55 31.3200 -97.3300 251.000 30.0 126.412 5.530 -999.990 -999.990 1.264 ..P WKT 2010 10 07 07 09 55 31.3200 -97.3300 251.000 122.0 140.969 5.670 -999.990 -999.990 1.410 ..P WKT 2010 10 07 07 14 55 31.3200 -97.3300 251.000 457.0 122.060 5.130 -999.990 -999.990 1.221 ..P WKT 2010 10 07 07 24 55 31.3200 -97.3300 251.000 30.0 129.864 6.500 -999.990 -999.990 1.299 ..P WKT 2010 10 07 07 29 55 31.3200 -97.3300 251.000 122.0 139.776 5.340 -999.990 -999.990 1.398 ..P WKT 2010 10 07 07 34 55 31.3200 -97.3300 251.000 457.0 113.358 5.450 -999.990 -999.990 1.134 ..P WKT 2010 10 07 07 39 55 31.3200 -97.3300 251.000 30.0 128.458 6.110 -999.990 -999.990 1.285 ..P WKT 2010 10 07 07 44 55 31.3200 -97.3300 251.000 122.0 134.817 7.110 -999.990 -999.990 1.348 ..P WKT 2010 10 07 07 49 55 31.3200 -97.3300 251.000 457.0 114.958 5.050 -999.990 -999.990 1.150 ..P WKT 2010 10 07 07 59 55 31.3200 -97.3300 251.000 30.0 132.982 5.090 -999.990 -999.990 1.330 ..P WKT 2010 10 07 08 04 55 31.3200 -97.3300 251.000 122.0 144.100 5.650 -999.990 -999.990 1.441 ..P WKT 2010 10 07 08 09 55 31.3200 -97.3300 251.000 457.0 126.272 6.440 -999.990 -999.990 1.263 ..P WKT 2010 10 07 08 14 55 31.3200 -97.3300 251.000 30.0 125.101 8.130 -999.990 -999.990 1.251 ..P WKT 2010 10 07 08 19 55 31.3200 -97.3300 251.000 122.0 141.679 5.070 -999.990 -999.990 1.417 ..P WKT 2010 10 07 08 24 55 31.3200 -97.3300 251.000 457.0 131.224 5.070 -999.990 -999.990 1.312 ..P WKT 2010 10 07 08 34 55 31.3200 -97.3300 251.000 30.0 141.871 5.270 -999.990 -999.990 1.419 ..P WKT 2010 10 07 08 39 55 31.3200 -97.3300 251.000 122.0 131.574 5.470 -999.990 -999.990 1.316 ..P WKT 2010 10 07 08 44 55 31.3200 -97.3300 251.000 457.0 136.292 5.490 -999.990 -999.990 1.363 ..P WKT 2010 10 07 08 49 55 31.3200 -97.3300 251.000 30.0 149.473 5.300 -999.990 -999.990 1.495 ..P WKT 2010 10 07 08 54 55 31.3200 -97.3300 251.000 122.0 129.076 5.090 -999.990 -999.990 1.291 ..P WKT 2010 10 07 08 59 55 31.3200 -97.3300 251.000 457.0 139.254 5.410 -999.990 -999.990 1.393 ..P WKT 2010 10 07 09 09 55 31.3200 -97.3300 251.000 30.0 228.544 5.780 -999.990 -999.990 2.285 ..P WKT 2010 10 07 09 14 55 31.3200 -97.3300 251.000 122.0 134.202 5.180 -999.990 -999.990 1.342 ..P WKT 2010 10 07 09 19 55 31.3200 -97.3300 251.000 457.0 128.158 5.040 -999.990 -999.990 1.282 ..P WKT 2010 10 07 09 24 55 31.3200 -97.3300 251.000 30.0 216.270 5.530 -999.990 -999.990 2.163 ..P WKT 2010 10 07 09 29 55 31.3200 -97.3300 251.000 122.0 116.618 5.310 -999.990 -999.990 1.166 ..P WKT 2010 10 07 09 34 55 31.3200 -97.3300 251.000 457.0 130.360 4.970 -999.990 -999.990 1.304 ..P WKT 2010 10 07 09 44 55 31.3200 -97.3300 251.000 30.0 263.891 11.460 -999.990 -999.990 2.639 ..P WKT 2010 10 07 09 49 55 31.3200 -97.3300 251.000 122.0 128.819 4.880 -999.990 -999.990 1.288 ..P WKT 2010 10 07 09 54 55 31.3200 -97.3300 251.000 457.0 127.864 4.910 -999.990 -999.990 1.279 ..P WKT 2010 10 07 09 59 55 31.3200 -97.3300 251.000 30.0 135.502 5.530 -999.990 -999.990 1.355 ..P WKT 2010 10 07 10 04 55 31.3200 -97.3300 251.000 122.0 126.908 5.190 -999.990 -999.990 1.269 ..P WKT 2010 10 07 10 09 55 31.3200 -97.3300 251.000 457.0 125.135 5.360 -999.990 -999.990 1.251 ..P WKT 2010 10 07 10 19 55 31.3200 -97.3300 251.000 30.0 141.774 5.690 -999.990 -999.990 1.418 ..P WKT 2010 10 07 10 24 55 31.3200 -97.3300 251.000 122.0 127.998 5.100 -999.990 -999.990 1.280 ..P WKT 2010 10 07 10 29 55 31.3200 -97.3300 251.000 457.0 118.996 4.930 -999.990 -999.990 1.190 ..P WKT 2010 10 07 10 34 55 31.3200 -97.3300 251.000 30.0 140.681 5.700 -999.990 -999.990 1.407 ..P WKT 2010 10 07 10 39 55 31.3200 -97.3300 251.000 122.0 129.633 5.110 -999.990 -999.990 1.296 ..P WKT 2010 10 07 10 44 55 31.3200 -97.3300 251.000 457.0 127.314 5.360 -999.990 -999.990 1.273 ..P WKT 2010 10 07 10 54 55 31.3200 -97.3300 251.000 30.0 148.333 5.850 -999.990 -999.990 1.483 ..P WKT 2010 10 07 10 59 55 31.3200 -97.3300 251.000 122.0 132.125 4.880 -999.990 -999.990 1.321 ..P WKT 2010 10 07 11 04 55 31.3200 -97.3300 251.000 457.0 126.826 4.810 -999.990 -999.990 1.268 ..P WKT 2010 10 07 11 09 55 31.3200 -97.3300 251.000 30.0 150.434 5.570 -999.990 -999.990 1.504 ..P WKT 2010 10 07 11 14 55 31.3200 -97.3300 251.000 122.0 131.091 5.560 -999.990 -999.990 1.311 ..P WKT 2010 10 07 11 19 55 31.3200 -97.3300 251.000 457.0 124.702 5.140 -999.990 -999.990 1.247 ..P WKT 2010 10 07 11 29 55 31.3200 -97.3300 251.000 30.0 160.746 5.020 -999.990 -999.990 1.607 ..P WKT 2010 10 07 11 34 55 31.3200 -97.3300 251.000 122.0 130.651 5.140 -999.990 -999.990 1.307 ..P WKT 2010 10 07 11 39 55 31.3200 -97.3300 251.000 457.0 134.092 4.860 -999.990 -999.990 1.341 ..P WKT 2010 10 07 11 44 55 31.3200 -97.3300 251.000 30.0 154.709 5.160 -999.990 -999.990 1.547 ..P WKT 2010 10 07 11 49 55 31.3200 -97.3300 251.000 122.0 138.521 5.080 -999.990 -999.990 1.385 ..P WKT 2010 10 07 12 09 55 31.3200 -97.3300 251.000 457.0 130.111 5.030 -999.990 -999.990 1.301 ..P WKT 2010 10 07 12 10 25 31.3200 -97.3300 251.000 457.0 130.633 5.170 -999.990 -999.990 1.306 ..P WKT 2010 10 07 12 10 55 31.3200 -97.3300 251.000 457.0 119.978 5.140 -999.990 -999.990 1.200 ..P WKT 2010 10 07 12 11 25 31.3200 -97.3300 251.000 457.0 123.227 5.650 -999.990 -999.990 1.232 ..P WKT 2010 10 07 12 11 55 31.3200 -97.3300 251.000 457.0 126.477 4.990 -999.990 -999.990 1.265 ..P WKT 2010 10 07 12 12 25 31.3200 -97.3300 251.000 457.0 122.638 5.070 -999.990 -999.990 1.226 ..P WKT 2010 10 07 12 12 55 31.3200 -97.3300 251.000 457.0 127.523 5.420 -999.990 -999.990 1.275 ..P WKT 2010 10 07 12 13 25 31.3200 -97.3300 251.000 457.0 126.955 4.840 -999.990 -999.990 1.270 ..P WKT 2010 10 07 12 13 55 31.3200 -97.3300 251.000 457.0 126.660 4.810 -999.990 -999.990 1.267 ..P WKT 2010 10 07 12 14 25 31.3200 -97.3300 251.000 457.0 119.276 4.980 -999.990 -999.990 1.193 ..P WKT 2010 10 07 12 14 55 31.3200 -97.3300 251.000 457.0 123.344 5.420 -999.990 -999.990 1.233 ..P WKT 2010 10 07 12 19 55 31.3200 -97.3300 251.000 30.0 148.479 4.940 -999.990 -999.990 1.485 ..P WKT 2010 10 07 12 24 55 31.3200 -97.3300 251.000 122.0 131.349 5.250 -999.990 -999.990 1.313 ..P WKT 2010 10 07 12 29 55 31.3200 -97.3300 251.000 457.0 127.853 4.910 -999.990 -999.990 1.279 ..P WKT 2010 10 07 12 34 55 31.3200 -97.3300 251.000 30.0 155.449 5.520 -999.990 -999.990 1.554 ..P WKT 2010 10 07 12 39 55 31.3200 -97.3300 251.000 122.0 134.770 5.320 -999.990 -999.990 1.348 ..P WKT 2010 10 07 12 44 55 31.3200 -97.3300 251.000 457.0 130.183 5.050 -999.990 -999.990 1.302 ..P WKT 2010 10 07 12 54 55 31.3200 -97.3300 251.000 30.0 155.702 5.120 -999.990 -999.990 1.557 ..P WKT 2010 10 07 12 59 55 31.3200 -97.3300 251.000 122.0 138.338 5.140 -999.990 -999.990 1.383 ..P WKT 2010 10 07 13 04 55 31.3200 -97.3300 251.000 457.0 119.199 5.400 -999.990 -999.990 1.192 ..P WKT 2010 10 07 13 09 55 31.3200 -97.3300 251.000 30.0 155.044 6.090 -999.990 -999.990 1.550 ..P WKT 2010 10 07 13 14 55 31.3200 -97.3300 251.000 122.0 139.041 5.650 -999.990 -999.990 1.390 ..P WKT 2010 10 07 13 19 55 31.3200 -97.3300 251.000 457.0 123.991 4.960 -999.990 -999.990 1.240 ..P WKT 2010 10 07 13 29 55 31.3200 -97.3300 251.000 30.0 149.064 5.270 -999.990 -999.990 1.491 ..P WKT 2010 10 07 13 34 55 31.3200 -97.3300 251.000 122.0 136.370 5.300 -999.990 -999.990 1.364 ..P WKT 2010 10 07 13 39 55 31.3200 -97.3300 251.000 457.0 126.814 5.840 -999.990 -999.990 1.268 ..P WKT 2010 10 07 13 44 55 31.3200 -97.3300 251.000 30.0 155.484 5.170 -999.990 -999.990 1.555 ..P WKT 2010 10 07 13 49 55 31.3200 -97.3300 251.000 122.0 138.282 5.720 -999.990 -999.990 1.383 ..P WKT 2010 10 07 13 54 55 31.3200 -97.3300 251.000 457.0 125.992 4.730 -999.990 -999.990 1.260 ..P WKT 2010 10 07 14 04 55 31.3200 -97.3300 251.000 30.0 156.933 4.600 -999.990 -999.990 1.569 ..P WKT 2010 10 07 14 09 55 31.3200 -97.3300 251.000 122.0 144.721 4.670 -999.990 -999.990 1.447 ..P WKT 2010 10 07 14 14 55 31.3200 -97.3300 251.000 457.0 129.502 5.500 -999.990 -999.990 1.295 ..P WKT 2010 10 07 14 19 55 31.3200 -97.3300 251.000 30.0 160.041 4.850 -999.990 -999.990 1.600 ..P WKT 2010 10 07 14 24 55 31.3200 -97.3300 251.000 122.0 157.798 4.940 -999.990 -999.990 1.578 ..P WKT 2010 10 07 14 29 55 31.3200 -97.3300 251.000 457.0 122.492 4.920 -999.990 -999.990 1.225 ..P WKT 2010 10 07 14 39 55 31.3200 -97.3300 251.000 30.0 158.682 4.730 -999.990 -999.990 1.587 ..P WKT 2010 10 07 14 44 55 31.3200 -97.3300 251.000 122.0 172.252 5.570 -999.990 -999.990 1.723 ..P WKT 2010 10 07 14 49 55 31.3200 -97.3300 251.000 457.0 136.761 4.540 -999.990 -999.990 1.368 ..P WKT 2010 10 07 14 54 55 31.3200 -97.3300 251.000 30.0 161.812 4.650 -999.990 -999.990 1.618 ..P WKT 2010 10 07 14 59 55 31.3200 -97.3300 251.000 122.0 159.939 4.740 -999.990 -999.990 1.599 ..P WKT 2010 10 07 15 04 55 31.3200 -97.3300 251.000 457.0 133.597 4.480 -999.990 -999.990 1.336 ..P WKT 2010 10 07 15 14 55 31.3200 -97.3300 251.000 30.0 155.120 4.940 -999.990 -999.990 1.551 ..P WKT 2010 10 07 15 19 55 31.3200 -97.3300 251.000 122.0 156.783 5.510 -999.990 -999.990 1.568 ..P WKT 2010 10 07 15 24 55 31.3200 -97.3300 251.000 457.0 135.471 4.450 -999.990 -999.990 1.355 ..P WKT 2010 10 07 15 29 55 31.3200 -97.3300 251.000 30.0 163.389 4.520 -999.990 -999.990 1.634 ..P WKT 2010 10 07 15 34 55 31.3200 -97.3300 251.000 122.0 160.402 4.860 -999.990 -999.990 1.604 ..P WKT 2010 10 07 15 39 55 31.3200 -97.3300 251.000 457.0 131.973 4.640 -999.990 -999.990 1.320 ..P WKT 2010 10 07 15 49 55 31.3200 -97.3300 251.000 30.0 162.655 5.340 -999.990 -999.990 1.627 ..P WKT 2010 10 07 15 54 55 31.3200 -97.3300 251.000 122.0 168.149 4.980 -999.990 -999.990 1.681 ..P WKT 2010 10 07 15 59 55 31.3200 -97.3300 251.000 457.0 140.806 4.900 -999.990 -999.990 1.408 ..P WKT 2010 10 07 16 04 55 31.3200 -97.3300 251.000 30.0 146.847 4.540 -999.990 -999.990 1.468 ..P WKT 2010 10 07 16 09 55 31.3200 -97.3300 251.000 122.0 145.772 4.390 -999.990 -999.990 1.458 ..P WKT 2010 10 07 16 14 55 31.3200 -97.3300 251.000 457.0 128.275 4.430 -999.990 -999.990 1.283 ..P WKT 2010 10 07 16 24 55 31.3200 -97.3300 251.000 30.0 144.660 4.500 -999.990 -999.990 1.447 ..P WKT 2010 10 07 16 29 55 31.3200 -97.3300 251.000 122.0 148.709 4.370 -999.990 -999.990 1.487 ..P WKT 2010 10 07 16 34 55 31.3200 -97.3300 251.000 457.0 143.996 4.780 -999.990 -999.990 1.440 ..P WKT 2010 10 07 16 39 55 31.3200 -97.3300 251.000 30.0 137.366 4.430 -999.990 -999.990 1.374 ..P WKT 2010 10 07 16 44 55 31.3200 -97.3300 251.000 122.0 143.606 4.690 -999.990 -999.990 1.436 ..P WKT 2010 10 07 16 49 55 31.3200 -97.3300 251.000 457.0 143.548 4.400 -999.990 -999.990 1.435 ..P WKT 2010 10 07 17 04 55 31.3200 -97.3300 251.000 30.0 138.668 4.460 -999.990 -999.990 1.387 ..P WKT 2010 10 07 17 09 55 31.3200 -97.3300 251.000 122.0 137.284 5.830 -999.990 -999.990 1.373 ..P WKT 2010 10 07 17 14 55 31.3200 -97.3300 251.000 457.0 133.433 4.580 -999.990 -999.990 1.334 ..P WKT 2010 10 07 17 19 55 31.3200 -97.3300 251.000 30.0 138.350 4.510 -999.990 -999.990 1.383 ..P WKT 2010 10 07 17 24 55 31.3200 -97.3300 251.000 122.0 135.733 4.980 -999.990 -999.990 1.357 ..P WKT 2010 10 07 17 29 55 31.3200 -97.3300 251.000 457.0 136.952 5.020 -999.990 -999.990 1.370 ..P WKT 2010 10 07 17 39 55 31.3200 -97.3300 251.000 30.0 127.441 4.830 -999.990 -999.990 1.274 ..P WKT 2010 10 07 17 44 55 31.3200 -97.3300 251.000 122.0 134.254 5.030 -999.990 -999.990 1.343 ..P WKT 2010 10 07 17 49 55 31.3200 -97.3300 251.000 457.0 132.708 5.140 -999.990 -999.990 1.327 ..P WKT 2010 10 07 17 54 55 31.3200 -97.3300 251.000 30.0 140.207 4.770 -999.990 -999.990 1.402 ..P WKT 2010 10 07 17 59 55 31.3200 -97.3300 251.000 122.0 135.918 5.190 -999.990 -999.990 1.359 ..P WKT 2010 10 07 18 04 55 31.3200 -97.3300 251.000 457.0 134.371 5.810 -999.990 -999.990 1.344 ..P WKT 2010 10 07 18 14 55 31.3200 -97.3300 251.000 30.0 140.326 6.190 -999.990 -999.990 1.403 ..P WKT 2010 10 07 18 19 55 31.3200 -97.3300 251.000 122.0 142.344 4.600 -999.990 -999.990 1.423 ..P WKT 2010 10 07 18 24 55 31.3200 -97.3300 251.000 457.0 134.488 4.470 -999.990 -999.990 1.345 ..P WKT 2010 10 07 18 29 55 31.3200 -97.3300 251.000 30.0 132.665 6.190 -999.990 -999.990 1.327 ..P WKT 2010 10 07 18 34 55 31.3200 -97.3300 251.000 122.0 133.587 4.610 -999.990 -999.990 1.336 ..P WKT 2010 10 07 18 39 55 31.3200 -97.3300 251.000 457.0 128.608 4.540 -999.990 -999.990 1.286 ..P WKT 2010 10 07 18 49 55 31.3200 -97.3300 251.000 30.0 127.138 3.880 -999.990 -999.990 1.271 ..P WKT 2010 10 07 18 54 55 31.3200 -97.3300 251.000 122.0 127.627 4.180 -999.990 -999.990 1.276 ..P WKT 2010 10 07 18 59 55 31.3200 -97.3300 251.000 457.0 122.627 3.970 -999.990 -999.990 1.226 ..P WKT 2010 10 07 19 04 55 31.3200 -97.3300 251.000 30.0 117.490 4.110 -999.990 -999.990 1.175 ..P WKT 2010 10 07 19 09 55 31.3200 -97.3300 251.000 122.0 122.508 6.450 -999.990 -999.990 1.225 ..P WKT 2010 10 07 19 14 55 31.3200 -97.3300 251.000 457.0 112.977 4.140 -999.990 -999.990 1.130 ..P WKT 2010 10 07 19 24 55 31.3200 -97.3300 251.000 30.0 120.484 4.600 -999.990 -999.990 1.205 ..P WKT 2010 10 07 19 29 55 31.3200 -97.3300 251.000 122.0 133.682 4.370 -999.990 -999.990 1.337 ..P WKT 2010 10 07 19 34 55 31.3200 -97.3300 251.000 457.0 125.463 5.020 -999.990 -999.990 1.255 ..P WKT 2010 10 07 19 39 55 31.3200 -97.3300 251.000 30.0 123.560 4.300 -999.990 -999.990 1.236 ..P WKT 2010 10 07 19 44 55 31.3200 -97.3300 251.000 122.0 131.818 6.350 -999.990 -999.990 1.318 ..P WKT 2010 10 07 19 49 55 31.3200 -97.3300 251.000 457.0 124.146 4.280 -999.990 -999.990 1.241 ..P WKT 2010 10 07 19 59 55 31.3200 -97.3300 251.000 30.0 131.365 4.050 -999.990 -999.990 1.314 ..P WKT 2010 10 07 20 04 55 31.3200 -97.3300 251.000 122.0 125.655 4.370 -999.990 -999.990 1.257 ..P WKT 2010 10 07 20 09 55 31.3200 -97.3300 251.000 457.0 121.316 4.730 -999.990 -999.990 1.213 ..P WKT 2010 10 07 20 14 55 31.3200 -97.3300 251.000 30.0 125.496 4.790 -999.990 -999.990 1.255 ..P WKT 2010 10 07 20 19 55 31.3200 -97.3300 251.000 122.0 131.874 4.010 -999.990 -999.990 1.319 ..P WKT 2010 10 07 20 24 55 31.3200 -97.3300 251.000 457.0 127.535 3.970 -999.990 -999.990 1.275 ..P WKT 2010 10 07 20 34 55 31.3200 -97.3300 251.000 30.0 133.934 3.900 -999.990 -999.990 1.339 ..P WKT 2010 10 07 20 39 55 31.3200 -97.3300 251.000 122.0 132.854 3.930 -999.990 -999.990 1.329 ..P WKT 2010 10 07 20 44 55 31.3200 -97.3300 251.000 457.0 132.323 4.000 -999.990 -999.990 1.323 ..P WKT 2010 10 07 20 49 55 31.3200 -97.3300 251.000 30.0 136.192 4.550 -999.990 -999.990 1.362 ..P WKT 2010 10 07 20 54 55 31.3200 -97.3300 251.000 122.0 134.837 4.140 -999.990 -999.990 1.348 ..P WKT 2010 10 07 20 59 55 31.3200 -97.3300 251.000 457.0 132.243 4.590 -999.990 -999.990 1.322 ..P WKT 2010 10 07 21 09 55 31.3200 -97.3300 251.000 30.0 127.705 4.200 -999.990 -999.990 1.277 ..P WKT 2010 10 07 21 14 55 31.3200 -97.3300 251.000 122.0 131.673 4.530 -999.990 -999.990 1.317 ..P WKT 2010 10 07 21 19 55 31.3200 -97.3300 251.000 457.0 133.303 4.310 -999.990 -999.990 1.333 ..P WKT 2010 10 07 21 24 55 31.3200 -97.3300 251.000 30.0 131.771 4.460 -999.990 -999.990 1.318 ..P WKT 2010 10 07 21 29 55 31.3200 -97.3300 251.000 122.0 139.041 5.020 -999.990 -999.990 1.390 ..P WKT 2010 10 07 21 34 55 31.3200 -97.3300 251.000 457.0 139.297 4.610 -999.990 -999.990 1.393 ..P WKT 2010 10 07 21 44 55 31.3200 -97.3300 251.000 30.0 130.512 4.430 -999.990 -999.990 1.305 ..P WKT 2010 10 07 21 49 55 31.3200 -97.3300 251.000 122.0 133.715 4.430 -999.990 -999.990 1.337 ..P WKT 2010 10 07 21 54 55 31.3200 -97.3300 251.000 457.0 134.167 4.570 -999.990 -999.990 1.342 ..P WKT 2010 10 07 21 59 55 31.3200 -97.3300 251.000 30.0 131.041 4.510 -999.990 -999.990 1.310 ..P WKT 2010 10 07 22 04 55 31.3200 -97.3300 251.000 122.0 138.787 5.260 -999.990 -999.990 1.388 ..P WKT 2010 10 07 22 09 55 31.3200 -97.3300 251.000 457.0 142.130 4.310 -999.990 -999.990 1.421 ..P WKT 2010 10 07 22 19 55 31.3200 -97.3300 251.000 30.0 132.061 4.640 -999.990 -999.990 1.321 ..P WKT 2010 10 07 22 24 55 31.3200 -97.3300 251.000 122.0 140.539 4.870 -999.990 -999.990 1.405 ..P WKT 2010 10 07 22 29 55 31.3200 -97.3300 251.000 457.0 140.067 4.510 -999.990 -999.990 1.401 ..P WKT 2010 10 07 22 34 55 31.3200 -97.3300 251.000 30.0 140.008 4.970 -999.990 -999.990 1.400 ..P WKT 2010 10 07 22 39 55 31.3200 -97.3300 251.000 122.0 139.673 4.580 -999.990 -999.990 1.397 ..P WKT 2010 10 07 22 44 55 31.3200 -97.3300 251.000 457.0 137.273 4.860 -999.990 -999.990 1.373 ..P WKT 2010 10 07 22 54 55 31.3200 -97.3300 251.000 30.0 119.032 4.550 -999.990 -999.990 1.190 ..P WKT 2010 10 07 22 59 55 31.3200 -97.3300 251.000 122.0 125.230 4.410 -999.990 -999.990 1.252 ..P WKT 2010 10 07 23 04 55 31.3200 -97.3300 251.000 457.0 123.851 5.080 -999.990 -999.990 1.239 ..P WKT 2010 10 07 23 09 55 31.3200 -97.3300 251.000 30.0 123.574 4.490 -999.990 -999.990 1.236 ..P WKT 2010 10 07 23 14 55 31.3200 -97.3300 251.000 122.0 126.881 4.490 -999.990 -999.990 1.269 ..P WKT 2010 10 07 23 19 55 31.3200 -97.3300 251.000 457.0 123.572 4.540 -999.990 -999.990 1.236 ..P WKT 2010 10 07 23 29 55 31.3200 -97.3300 251.000 30.0 122.178 4.420 -999.990 -999.990 1.222 ..P WKT 2010 10 07 23 34 55 31.3200 -97.3300 251.000 122.0 129.880 3.930 -999.990 -999.990 1.299 ..P WKT 2010 10 07 23 39 55 31.3200 -97.3300 251.000 457.0 130.417 3.880 -999.990 -999.990 1.304 ..P WKT 2010 10 07 23 44 55 31.3200 -97.3300 251.000 30.0 123.233 4.290 -999.990 -999.990 1.232 ..P WKT 2010 10 07 23 49 55 31.3200 -97.3300 251.000 122.0 125.147 3.890 -999.990 -999.990 1.251 ..P WKT 2010 10 08 00 09 55 31.3200 -97.3300 251.000 457.0 127.415 3.580 -999.990 -999.990 1.274 ..P WKT 2010 10 08 00 10 25 31.3200 -97.3300 251.000 457.0 128.532 3.410 -999.990 -999.990 1.285 ..P WKT 2010 10 08 00 10 55 31.3200 -97.3300 251.000 457.0 121.930 4.330 -999.990 -999.990 1.219 ..P WKT 2010 10 08 00 11 25 31.3200 -97.3300 251.000 457.0 124.977 3.440 -999.990 -999.990 1.250 ..P WKT 2010 10 08 00 11 55 31.3200 -97.3300 251.000 457.0 123.338 3.570 -999.990 -999.990 1.233 ..P WKT 2010 10 08 00 12 25 31.3200 -97.3300 251.000 457.0 128.315 3.460 -999.990 -999.990 1.283 ..P WKT 2010 10 08 00 12 55 31.3200 -97.3300 251.000 457.0 127.502 3.650 -999.990 -999.990 1.275 ..P WKT 2010 10 08 00 13 25 31.3200 -97.3300 251.000 457.0 125.311 3.720 -999.990 -999.990 1.253 ..P WKT 2010 10 08 00 13 55 31.3200 -97.3300 251.000 457.0 126.152 3.470 -999.990 -999.990 1.262 ..P WKT 2010 10 08 00 14 25 31.3200 -97.3300 251.000 457.0 124.237 3.640 -999.990 -999.990 1.242 ..P WKT 2010 10 08 00 14 55 31.3200 -97.3300 251.000 457.0 125.630 3.530 -999.990 -999.990 1.256 ..P WKT 2010 10 08 00 19 55 31.3200 -97.3300 251.000 30.0 118.056 3.380 -999.990 -999.990 1.181 ..P WKT 2010 10 08 00 24 55 31.3200 -97.3300 251.000 122.0 123.715 4.160 -999.990 -999.990 1.237 ..P WKT 2010 10 08 00 29 55 31.3200 -97.3300 251.000 457.0 133.505 4.430 -999.990 -999.990 1.335 ..P WKT 2010 10 08 00 34 55 31.3200 -97.3300 251.000 30.0 118.770 3.700 -999.990 -999.990 1.188 ..P WKT 2010 10 08 00 39 55 31.3200 -97.3300 251.000 122.0 126.078 3.960 -999.990 -999.990 1.261 ..P WKT 2010 10 08 00 44 55 31.3200 -97.3300 251.000 457.0 124.295 3.640 -999.990 -999.990 1.243 ..P WKT 2010 10 08 00 54 55 31.3200 -97.3300 251.000 30.0 122.169 3.560 -999.990 -999.990 1.222 ..P WKT 2010 10 08 00 59 55 31.3200 -97.3300 251.000 122.0 120.725 3.480 -999.990 -999.990 1.207 ..P WKT 2010 10 08 01 04 55 31.3200 -97.3300 251.000 457.0 124.376 3.890 -999.990 -999.990 1.244 ..P WKT 2010 10 08 01 09 55 31.3200 -97.3300 251.000 30.0 118.114 4.880 -999.990 -999.990 1.181 ..P WKT 2010 10 08 01 14 55 31.3200 -97.3300 251.000 122.0 123.141 3.880 -999.990 -999.990 1.231 ..P WKT 2010 10 08 01 19 55 31.3200 -97.3300 251.000 457.0 120.183 3.700 -999.990 -999.990 1.202 ..P WKT 2010 10 08 01 29 55 31.3200 -97.3300 251.000 30.0 122.665 4.860 -999.990 -999.990 1.227 ..P WKT 2010 10 08 01 34 55 31.3200 -97.3300 251.000 122.0 123.149 3.910 -999.990 -999.990 1.231 ..P WKT 2010 10 08 01 39 55 31.3200 -97.3300 251.000 457.0 120.743 4.330 -999.990 -999.990 1.207 ..P WKT 2010 10 08 01 44 55 31.3200 -97.3300 251.000 30.0 121.364 5.300 -999.990 -999.990 1.214 ..P WKT 2010 10 08 01 49 55 31.3200 -97.3300 251.000 122.0 124.048 4.010 -999.990 -999.990 1.240 ..P WKT 2010 10 08 01 54 55 31.3200 -97.3300 251.000 457.0 123.019 4.100 -999.990 -999.990 1.230 ..P WKT 2010 10 08 02 04 55 31.3200 -97.3300 251.000 30.0 120.116 4.670 -999.990 -999.990 1.201 ..P WKT 2010 10 08 02 09 55 31.3200 -97.3300 251.000 122.0 121.817 4.380 -999.990 -999.990 1.218 ..P WKT 2010 10 08 02 14 55 31.3200 -97.3300 251.000 457.0 116.370 4.950 -999.990 -999.990 1.164 ..P WKT 2010 10 08 02 19 55 31.3200 -97.3300 251.000 30.0 108.590 5.520 -999.990 -999.990 1.086 ..P WKT 2010 10 08 02 24 55 31.3200 -97.3300 251.000 122.0 116.062 4.850 -999.990 -999.990 1.161 ..P WKT 2010 10 08 02 29 55 31.3200 -97.3300 251.000 457.0 111.717 3.850 -999.990 -999.990 1.117 ..P WKT 2010 10 08 02 39 55 31.3200 -97.3300 251.000 30.0 118.218 3.790 -999.990 -999.990 1.182 ..P WKT 2010 10 08 02 44 55 31.3200 -97.3300 251.000 122.0 122.193 4.840 -999.990 -999.990 1.222 ..P WKT 2010 10 08 02 49 55 31.3200 -97.3300 251.000 457.0 119.440 5.460 -999.990 -999.990 1.194 ..P WKT 2010 10 08 02 54 55 31.3200 -97.3300 251.000 30.0 127.121 4.830 -999.990 -999.990 1.271 ..P WKT 2010 10 08 02 59 55 31.3200 -97.3300 251.000 122.0 131.368 4.430 -999.990 -999.990 1.314 ..P WKT 2010 10 08 03 04 55 31.3200 -97.3300 251.000 457.0 123.810 3.850 -999.990 -999.990 1.238 ..P WKT 2010 10 08 03 14 55 31.3200 -97.3300 251.000 30.0 126.087 3.570 -999.990 -999.990 1.261 ..P WKT 2010 10 08 03 19 55 31.3200 -97.3300 251.000 122.0 130.979 4.530 -999.990 -999.990 1.310 ..P WKT 2010 10 08 03 24 55 31.3200 -97.3300 251.000 457.0 125.718 4.500 -999.990 -999.990 1.257 ..P WKT 2010 10 08 03 29 55 31.3200 -97.3300 251.000 30.0 131.158 3.990 -999.990 -999.990 1.312 ..P WKT 2010 10 08 03 34 55 31.3200 -97.3300 251.000 122.0 134.950 4.980 -999.990 -999.990 1.349 ..P WKT 2010 10 08 03 39 55 31.3200 -97.3300 251.000 457.0 132.981 4.070 -999.990 -999.990 1.330 ..P WKT 2010 10 08 03 49 55 31.3200 -97.3300 251.000 30.0 133.119 3.550 -999.990 -999.990 1.331 ..P WKT 2010 10 08 03 54 55 31.3200 -97.3300 251.000 122.0 134.403 3.840 -999.990 -999.990 1.344 ..P WKT 2010 10 08 03 59 55 31.3200 -97.3300 251.000 457.0 125.817 4.660 -999.990 -999.990 1.258 ..P WKT 2010 10 08 04 04 55 31.3200 -97.3300 251.000 30.0 127.649 4.700 -999.990 -999.990 1.276 ..P WKT 2010 10 08 04 09 55 31.3200 -97.3300 251.000 122.0 136.059 4.600 -999.990 -999.990 1.361 ..P WKT 2010 10 08 04 14 55 31.3200 -97.3300 251.000 457.0 138.985 5.320 -999.990 -999.990 1.390 ..P WKT 2010 10 08 04 24 55 31.3200 -97.3300 251.000 30.0 143.917 4.970 -999.990 -999.990 1.439 ..P WKT 2010 10 08 04 29 55 31.3200 -97.3300 251.000 122.0 137.977 5.330 -999.990 -999.990 1.380 ..P WKT 2010 10 08 04 34 55 31.3200 -97.3300 251.000 457.0 130.944 4.390 -999.990 -999.990 1.309 ..P WKT 2010 10 08 04 39 55 31.3200 -97.3300 251.000 30.0 126.925 5.260 -999.990 -999.990 1.269 ..P WKT 2010 10 08 04 44 55 31.3200 -97.3300 251.000 122.0 123.454 4.890 -999.990 -999.990 1.235 ..P WKT 2010 10 08 04 49 55 31.3200 -97.3300 251.000 457.0 140.657 3.800 -999.990 -999.990 1.407 ..P WKT 2010 10 08 05 04 55 31.3200 -97.3300 251.000 30.0 118.349 5.510 -999.990 -999.990 1.183 ..P WKT 2010 10 08 05 09 55 31.3200 -97.3300 251.000 122.0 123.713 5.440 -999.990 -999.990 1.237 ..P WKT 2010 10 08 05 14 55 31.3200 -97.3300 251.000 457.0 138.515 7.070 -999.990 -999.990 1.385 ..P WKT 2010 10 08 05 19 55 31.3200 -97.3300 251.000 30.0 128.690 5.120 -999.990 -999.990 1.287 ..P WKT 2010 10 08 05 24 55 31.3200 -97.3300 251.000 122.0 134.186 4.770 -999.990 -999.990 1.342 ..P WKT 2010 10 08 05 29 55 31.3200 -97.3300 251.000 457.0 138.588 3.740 -999.990 -999.990 1.386 ..P WKT 2010 10 08 05 39 55 31.3200 -97.3300 251.000 30.0 134.618 4.050 -999.990 -999.990 1.346 ..P WKT 2010 10 08 05 44 55 31.3200 -97.3300 251.000 122.0 136.503 4.590 -999.990 -999.990 1.365 ..P WKT 2010 10 08 05 49 55 31.3200 -97.3300 251.000 457.0 139.345 5.160 -999.990 -999.990 1.393 ..P WKT 2010 10 08 05 54 55 31.3200 -97.3300 251.000 30.0 157.631 4.330 -999.990 -999.990 1.576 ..P WKT 2010 10 08 05 59 55 31.3200 -97.3300 251.000 122.0 144.616 3.570 -999.990 -999.990 1.446 ..P WKT 2010 10 08 06 04 55 31.3200 -97.3300 251.000 457.0 138.437 3.040 -999.990 -999.990 1.384 ..P WKT 2010 10 08 06 14 55 31.3200 -97.3300 251.000 30.0 140.290 3.140 -999.990 -999.990 1.403 ..P WKT 2010 10 08 06 19 55 31.3200 -97.3300 251.000 122.0 138.349 3.330 -999.990 -999.990 1.383 ..P WKT 2010 10 08 06 24 55 31.3200 -97.3300 251.000 457.0 151.568 3.320 -999.990 -999.990 1.516 ..P WKT 2010 10 08 06 29 55 31.3200 -97.3300 251.000 30.0 152.629 4.090 -999.990 -999.990 1.526 ..P WKT 2010 10 08 06 34 55 31.3200 -97.3300 251.000 122.0 132.662 3.010 -999.990 -999.990 1.327 ..P WKT 2010 10 08 06 39 55 31.3200 -97.3300 251.000 457.0 136.593 3.690 -999.990 -999.990 1.366 ..P WKT 2010 10 08 06 49 55 31.3200 -97.3300 251.000 30.0 154.006 2.990 -999.990 -999.990 1.540 ..P WKT 2010 10 08 06 54 55 31.3200 -97.3300 251.000 122.0 194.646 4.730 -999.990 -999.990 1.946 ..P WKT 2010 10 08 06 59 55 31.3200 -97.3300 251.000 457.0 136.749 3.320 -999.990 -999.990 1.367 ..P WKT 2010 10 08 07 04 55 31.3200 -97.3300 251.000 30.0 150.911 3.050 -999.990 -999.990 1.509 ..P WKT 2010 10 08 07 09 55 31.3200 -97.3300 251.000 122.0 131.780 3.320 -999.990 -999.990 1.318 ..P WKT 2010 10 08 07 14 55 31.3200 -97.3300 251.000 457.0 144.574 3.380 -999.990 -999.990 1.446 ..P WKT 2010 10 08 07 24 55 31.3200 -97.3300 251.000 30.0 174.693 3.360 -999.990 -999.990 1.747 ..P WKT 2010 10 08 07 29 55 31.3200 -97.3300 251.000 122.0 137.199 4.120 -999.990 -999.990 1.372 ..P WKT 2010 10 08 07 34 55 31.3200 -97.3300 251.000 457.0 126.438 3.000 -999.990 -999.990 1.264 ..P WKT 2010 10 08 07 39 55 31.3200 -97.3300 251.000 30.0 181.389 4.280 -999.990 -999.990 1.814 ..P WKT 2010 10 08 07 44 55 31.3200 -97.3300 251.000 122.0 170.624 4.180 -999.990 -999.990 1.706 ..P WKT 2010 10 08 07 49 55 31.3200 -97.3300 251.000 457.0 134.513 3.280 -999.990 -999.990 1.345 ..P WKT 2010 10 08 07 59 55 31.3200 -97.3300 251.000 30.0 167.469 3.280 -999.990 -999.990 1.675 ..P WKT 2010 10 08 08 04 55 31.3200 -97.3300 251.000 122.0 136.509 3.290 -999.990 -999.990 1.365 ..P WKT 2010 10 08 08 09 55 31.3200 -97.3300 251.000 457.0 129.260 3.400 -999.990 -999.990 1.293 ..P WKT 2010 10 08 08 14 55 31.3200 -97.3300 251.000 30.0 156.883 4.380 -999.990 -999.990 1.569 ..P WKT 2010 10 08 08 19 55 31.3200 -97.3300 251.000 122.0 123.212 4.370 -999.990 -999.990 1.232 ..P WKT 2010 10 08 08 24 55 31.3200 -97.3300 251.000 457.0 129.585 3.170 -999.990 -999.990 1.296 ..P WKT 2010 10 08 08 34 55 31.3200 -97.3300 251.000 30.0 157.476 4.680 -999.990 -999.990 1.575 ..P WKT 2010 10 08 08 39 55 31.3200 -97.3300 251.000 122.0 131.076 4.580 -999.990 -999.990 1.311 ..P WKT 2010 10 08 08 44 55 31.3200 -97.3300 251.000 457.0 131.495 4.470 -999.990 -999.990 1.315 ..P WKT 2010 10 08 08 49 55 31.3200 -97.3300 251.000 30.0 164.983 5.630 -999.990 -999.990 1.650 ..P WKT 2010 10 08 08 54 55 31.3200 -97.3300 251.000 122.0 133.829 4.870 -999.990 -999.990 1.338 ..P WKT 2010 10 08 08 59 55 31.3200 -97.3300 251.000 457.0 127.308 3.720 -999.990 -999.990 1.273 ..P WKT 2010 10 08 09 09 55 31.3200 -97.3300 251.000 30.0 155.506 4.100 -999.990 -999.990 1.555 ..P WKT 2010 10 08 09 14 55 31.3200 -97.3300 251.000 122.0 138.533 4.410 -999.990 -999.990 1.385 ..P WKT 2010 10 08 09 19 55 31.3200 -97.3300 251.000 457.0 128.363 5.600 -999.990 -999.990 1.284 ..P WKT 2010 10 08 09 24 55 31.3200 -97.3300 251.000 30.0 156.675 4.850 -999.990 -999.990 1.567 ..P WKT 2010 10 08 09 29 55 31.3200 -97.3300 251.000 122.0 140.116 5.580 -999.990 -999.990 1.401 ..P WKT 2010 10 08 09 34 55 31.3200 -97.3300 251.000 457.0 126.279 5.950 -999.990 -999.990 1.263 ..P WKT 2010 10 08 09 44 55 31.3200 -97.3300 251.000 30.0 160.744 5.370 -999.990 -999.990 1.607 ..P WKT 2010 10 08 09 49 55 31.3200 -97.3300 251.000 122.0 143.260 5.340 -999.990 -999.990 1.433 ..P WKT 2010 10 08 09 54 55 31.3200 -97.3300 251.000 457.0 131.759 4.490 -999.990 -999.990 1.318 ..P WKT 2010 10 08 09 59 55 31.3200 -97.3300 251.000 30.0 150.556 4.190 -999.990 -999.990 1.506 ..P WKT 2010 10 08 10 04 55 31.3200 -97.3300 251.000 122.0 135.254 4.450 -999.990 -999.990 1.353 ..P WKT 2010 10 08 10 09 55 31.3200 -97.3300 251.000 457.0 131.771 3.570 -999.990 -999.990 1.318 ..P WKT 2010 10 08 10 19 55 31.3200 -97.3300 251.000 30.0 147.504 3.540 -999.990 -999.990 1.475 ..P WKT 2010 10 08 10 24 55 31.3200 -97.3300 251.000 122.0 134.401 3.210 -999.990 -999.990 1.344 ..P WKT 2010 10 08 10 29 55 31.3200 -97.3300 251.000 457.0 125.917 3.800 -999.990 -999.990 1.259 ..P WKT 2010 10 08 10 34 55 31.3200 -97.3300 251.000 30.0 147.433 4.230 -999.990 -999.990 1.474 ..P WKT 2010 10 08 10 39 55 31.3200 -97.3300 251.000 122.0 140.578 3.800 -999.990 -999.990 1.406 ..P WKT 2010 10 08 10 44 55 31.3200 -97.3300 251.000 457.0 136.439 4.190 -999.990 -999.990 1.364 ..P WKT 2010 10 08 10 54 55 31.3200 -97.3300 251.000 30.0 152.622 3.570 -999.990 -999.990 1.526 ..P WKT 2010 10 08 10 59 55 31.3200 -97.3300 251.000 122.0 139.976 4.120 -999.990 -999.990 1.400 ..P WKT 2010 10 08 11 04 55 31.3200 -97.3300 251.000 457.0 132.487 3.450 -999.990 -999.990 1.325 ..P WKT 2010 10 08 11 09 55 31.3200 -97.3300 251.000 30.0 151.038 3.520 -999.990 -999.990 1.510 ..P WKT 2010 10 08 11 14 55 31.3200 -97.3300 251.000 122.0 132.159 3.560 -999.990 -999.990 1.322 ..P WKT 2010 10 08 11 19 55 31.3200 -97.3300 251.000 457.0 131.995 3.860 -999.990 -999.990 1.320 ..P WKT 2010 10 08 11 29 55 31.3200 -97.3300 251.000 30.0 154.561 3.360 -999.990 -999.990 1.546 ..P WKT 2010 10 08 11 34 55 31.3200 -97.3300 251.000 122.0 133.101 3.050 -999.990 -999.990 1.331 ..P WKT 2010 10 08 11 39 55 31.3200 -97.3300 251.000 457.0 126.554 3.230 -999.990 -999.990 1.266 ..P WKT 2010 10 08 11 44 55 31.3200 -97.3300 251.000 30.0 145.753 3.170 -999.990 -999.990 1.458 ..P WKT 2010 10 08 11 49 55 31.3200 -97.3300 251.000 122.0 137.850 3.130 -999.990 -999.990 1.379 ..P WKT 2010 10 08 12 09 55 31.3200 -97.3300 251.000 457.0 127.656 3.620 -999.990 -999.990 1.277 ..P WKT 2010 10 08 12 10 25 31.3200 -97.3300 251.000 457.0 126.513 3.680 -999.990 -999.990 1.265 ..P WKT 2010 10 08 12 10 55 31.3200 -97.3300 251.000 457.0 129.165 3.320 -999.990 -999.990 1.292 ..P WKT 2010 10 08 12 11 25 31.3200 -97.3300 251.000 457.0 126.396 3.310 -999.990 -999.990 1.264 ..P WKT 2010 10 08 12 11 55 31.3200 -97.3300 251.000 457.0 130.944 3.110 -999.990 -999.990 1.309 ..P WKT 2010 10 08 12 12 25 31.3200 -97.3300 251.000 457.0 125.195 3.230 -999.990 -999.990 1.252 ..P WKT 2010 10 08 12 12 55 31.3200 -97.3300 251.000 457.0 127.305 3.340 -999.990 -999.990 1.273 ..P WKT 2010 10 08 12 13 25 31.3200 -97.3300 251.000 457.0 126.704 3.120 -999.990 -999.990 1.267 ..P WKT 2010 10 08 12 13 55 31.3200 -97.3300 251.000 457.0 126.103 3.220 -999.990 -999.990 1.261 ..P WKT 2010 10 08 12 14 25 31.3200 -97.3300 251.000 457.0 126.045 3.610 -999.990 -999.990 1.260 ..P WKT 2010 10 08 12 14 55 31.3200 -97.3300 251.000 457.0 125.715 3.140 -999.990 -999.990 1.257 ..P WKT 2010 10 08 12 19 55 31.3200 -97.3300 251.000 30.0 148.705 3.310 -999.990 -999.990 1.487 ..P WKT 2010 10 08 12 24 55 31.3200 -97.3300 251.000 122.0 121.833 3.500 -999.990 -999.990 1.218 ..P WKT 2010 10 08 12 29 55 31.3200 -97.3300 251.000 457.0 129.105 4.480 -999.990 -999.990 1.291 ..P WKT 2010 10 08 12 34 55 31.3200 -97.3300 251.000 30.0 146.408 4.200 -999.990 -999.990 1.464 ..P WKT 2010 10 08 12 39 55 31.3200 -97.3300 251.000 122.0 128.746 3.600 -999.990 -999.990 1.287 ..P WKT 2010 10 08 12 44 55 31.3200 -97.3300 251.000 457.0 129.652 3.860 -999.990 -999.990 1.297 ..P WKT 2010 10 08 12 54 55 31.3200 -97.3300 251.000 30.0 144.075 4.130 -999.990 -999.990 1.441 ..P WKT 2010 10 08 12 59 55 31.3200 -97.3300 251.000 122.0 129.668 4.100 -999.990 -999.990 1.297 ..P WKT 2010 10 08 13 04 55 31.3200 -97.3300 251.000 457.0 122.580 4.150 -999.990 -999.990 1.226 ..P WKT 2010 10 08 13 09 55 31.3200 -97.3300 251.000 30.0 139.626 4.580 -999.990 -999.990 1.396 ..P WKT 2010 10 08 13 14 55 31.3200 -97.3300 251.000 122.0 126.571 4.240 -999.990 -999.990 1.266 ..P WKT 2010 10 08 13 19 55 31.3200 -97.3300 251.000 457.0 128.161 4.370 -999.990 -999.990 1.282 ..P WKT 2010 10 08 13 29 55 31.3200 -97.3300 251.000 30.0 147.616 4.560 -999.990 -999.990 1.476 ..P WKT 2010 10 08 13 34 55 31.3200 -97.3300 251.000 122.0 135.915 3.920 -999.990 -999.990 1.359 ..P WKT 2010 10 08 13 39 55 31.3200 -97.3300 251.000 457.0 125.840 3.530 -999.990 -999.990 1.258 ..P WKT 2010 10 08 13 44 55 31.3200 -97.3300 251.000 30.0 145.880 5.690 -999.990 -999.990 1.459 ..P WKT 2010 10 08 13 49 55 31.3200 -97.3300 251.000 122.0 133.768 4.070 -999.990 -999.990 1.338 ..P WKT 2010 10 08 13 54 55 31.3200 -97.3300 251.000 457.0 124.505 3.500 -999.990 -999.990 1.245 ..P WKT 2010 10 08 14 04 55 31.3200 -97.3300 251.000 30.0 148.060 3.500 -999.990 -999.990 1.481 ..P WKT 2010 10 08 14 09 55 31.3200 -97.3300 251.000 122.0 127.416 4.570 -999.990 -999.990 1.274 ..P WKT 2010 10 08 14 14 55 31.3200 -97.3300 251.000 457.0 125.905 3.930 -999.990 -999.990 1.259 ..P WKT 2010 10 08 14 19 55 31.3200 -97.3300 251.000 30.0 151.674 4.050 -999.990 -999.990 1.517 ..P WKT 2010 10 08 14 24 55 31.3200 -97.3300 251.000 122.0 134.012 3.600 -999.990 -999.990 1.340 ..P WKT 2010 10 08 14 29 55 31.3200 -97.3300 251.000 457.0 129.786 3.230 -999.990 -999.990 1.298 ..P WKT 2010 10 08 14 39 55 31.3200 -97.3300 251.000 30.0 152.268 4.230 -999.990 -999.990 1.523 ..P WKT 2010 10 08 14 44 55 31.3200 -97.3300 251.000 122.0 154.132 3.990 -999.990 -999.990 1.541 ..P WKT 2010 10 08 14 49 55 31.3200 -97.3300 251.000 457.0 135.494 3.680 -999.990 -999.990 1.355 ..P WKT 2010 10 08 14 54 55 31.3200 -97.3300 251.000 30.0 152.975 5.380 -999.990 -999.990 1.530 ..P WKT 2010 10 08 14 59 55 31.3200 -97.3300 251.000 122.0 143.568 4.330 -999.990 -999.990 1.436 ..P WKT 2010 10 08 15 04 55 31.3200 -97.3300 251.000 457.0 126.826 4.310 -999.990 -999.990 1.268 ..P WKT 2010 10 08 15 14 55 31.3200 -97.3300 251.000 30.0 144.195 3.690 -999.990 -999.990 1.442 ..P WKT 2010 10 08 15 19 55 31.3200 -97.3300 251.000 122.0 142.994 3.570 -999.990 -999.990 1.430 ..P WKT 2010 10 08 15 24 55 31.3200 -97.3300 251.000 457.0 124.132 4.200 -999.990 -999.990 1.241 ..P WKT 2010 10 08 15 29 55 31.3200 -97.3300 251.000 30.0 144.124 3.930 -999.990 -999.990 1.441 ..P WKT 2010 10 08 15 34 55 31.3200 -97.3300 251.000 122.0 145.640 3.410 -999.990 -999.990 1.456 ..P WKT 2010 10 08 15 39 55 31.3200 -97.3300 251.000 457.0 132.753 4.100 -999.990 -999.990 1.328 ..P WKT 2010 10 08 15 49 55 31.3200 -97.3300 251.000 30.0 144.677 3.960 -999.990 -999.990 1.447 ..P WKT 2010 10 08 15 54 55 31.3200 -97.3300 251.000 122.0 141.223 3.600 -999.990 -999.990 1.412 ..P WKT 2010 10 08 15 59 55 31.3200 -97.3300 251.000 457.0 125.808 3.520 -999.990 -999.990 1.258 ..P WKT 2010 10 08 16 04 55 31.3200 -97.3300 251.000 30.0 134.586 3.140 -999.990 -999.990 1.346 ..P WKT 2010 10 08 16 09 55 31.3200 -97.3300 251.000 122.0 142.278 5.090 -999.990 -999.990 1.423 ..P WKT 2010 10 08 16 14 55 31.3200 -97.3300 251.000 457.0 131.481 4.490 -999.990 -999.990 1.315 ..P WKT 2010 10 08 16 24 55 31.3200 -97.3300 251.000 30.0 143.508 3.440 -999.990 -999.990 1.435 ..P WKT 2010 10 08 16 29 55 31.3200 -97.3300 251.000 122.0 143.763 3.460 -999.990 -999.990 1.438 ..P WKT 2010 10 08 16 34 55 31.3200 -97.3300 251.000 457.0 134.770 3.220 -999.990 -999.990 1.348 ..P WKT 2010 10 08 16 39 55 31.3200 -97.3300 251.000 30.0 139.376 3.420 -999.990 -999.990 1.394 ..P WKT 2010 10 08 16 44 55 31.3200 -97.3300 251.000 122.0 139.086 3.620 -999.990 -999.990 1.391 ..P WKT 2010 10 08 16 49 55 31.3200 -97.3300 251.000 457.0 133.765 5.440 -999.990 -999.990 1.338 ..P WKT 2010 10 08 17 04 55 31.3200 -97.3300 251.000 30.0 132.899 3.790 -999.990 -999.990 1.329 ..P WKT 2010 10 08 17 09 55 31.3200 -97.3300 251.000 122.0 141.727 3.460 -999.990 -999.990 1.417 ..P WKT 2010 10 08 17 14 55 31.3200 -97.3300 251.000 457.0 136.270 3.660 -999.990 -999.990 1.363 ..P WKT 2010 10 08 17 19 55 31.3200 -97.3300 251.000 30.0 145.780 4.610 -999.990 -999.990 1.458 ..P WKT 2010 10 08 17 24 55 31.3200 -97.3300 251.000 122.0 138.961 3.510 -999.990 -999.990 1.390 ..P WKT 2010 10 08 17 29 55 31.3200 -97.3300 251.000 457.0 144.798 3.890 -999.990 -999.990 1.448 ..P WKT 2010 10 08 17 39 55 31.3200 -97.3300 251.000 30.0 142.588 3.580 -999.990 -999.990 1.426 ..P WKT 2010 10 08 17 44 55 31.3200 -97.3300 251.000 122.0 142.571 4.350 -999.990 -999.990 1.426 ..P WKT 2010 10 08 17 49 55 31.3200 -97.3300 251.000 457.0 144.323 4.670 -999.990 -999.990 1.443 ..P WKT 2010 10 08 17 54 55 31.3200 -97.3300 251.000 30.0 147.983 4.140 -999.990 -999.990 1.480 ..P WKT 2010 10 08 17 59 55 31.3200 -97.3300 251.000 122.0 146.331 3.700 -999.990 -999.990 1.463 ..P WKT 2010 10 08 18 04 55 31.3200 -97.3300 251.000 457.0 143.455 3.890 -999.990 -999.990 1.435 ..P WKT 2010 10 08 18 14 55 31.3200 -97.3300 251.000 30.0 151.377 3.560 -999.990 -999.990 1.514 ..P WKT 2010 10 08 18 19 55 31.3200 -97.3300 251.000 122.0 144.473 4.000 -999.990 -999.990 1.445 ..P WKT 2010 10 08 18 24 55 31.3200 -97.3300 251.000 457.0 153.231 4.340 -999.990 -999.990 1.532 ..P WKT 2010 10 08 18 29 55 31.3200 -97.3300 251.000 30.0 146.053 4.540 -999.990 -999.990 1.461 ..P WKT 2010 10 08 18 34 55 31.3200 -97.3300 251.000 122.0 149.773 4.610 -999.990 -999.990 1.498 ..P WKT 2010 10 08 18 39 55 31.3200 -97.3300 251.000 457.0 140.414 4.110 -999.990 -999.990 1.404 ..P WKT 2010 10 08 18 49 55 31.3200 -97.3300 251.000 30.0 138.452 3.410 -999.990 -999.990 1.385 ..P WKT 2010 10 08 18 54 55 31.3200 -97.3300 251.000 122.0 132.770 4.080 -999.990 -999.990 1.328 ..P WKT 2010 10 08 18 59 55 31.3200 -97.3300 251.000 457.0 138.261 5.450 -999.990 -999.990 1.383 ..P WKT 2010 10 08 19 04 55 31.3200 -97.3300 251.000 30.0 143.481 4.970 -999.990 -999.990 1.435 ..P WKT 2010 10 08 19 09 55 31.3200 -97.3300 251.000 122.0 141.341 4.170 -999.990 -999.990 1.413 ..P WKT 2010 10 08 19 14 55 31.3200 -97.3300 251.000 457.0 146.834 4.440 -999.990 -999.990 1.468 ..P WKT 2010 10 08 19 24 55 31.3200 -97.3300 251.000 30.0 143.684 4.100 -999.990 -999.990 1.437 ..P WKT 2010 10 08 19 29 55 31.3200 -97.3300 251.000 122.0 146.764 4.030 -999.990 -999.990 1.468 ..P WKT 2010 10 08 19 34 55 31.3200 -97.3300 251.000 457.0 144.117 4.800 -999.990 -999.990 1.441 ..P WKT 2010 10 08 19 39 55 31.3200 -97.3300 251.000 30.0 137.380 4.790 -999.990 -999.990 1.374 ..P WKT 2010 10 08 19 44 55 31.3200 -97.3300 251.000 122.0 142.368 4.330 -999.990 -999.990 1.424 ..P WKT 2010 10 08 19 49 55 31.3200 -97.3300 251.000 457.0 135.903 3.770 -999.990 -999.990 1.359 ..P WKT 2010 10 08 19 59 55 31.3200 -97.3300 251.000 30.0 133.120 3.530 -999.990 -999.990 1.331 ..P WKT 2010 10 08 20 04 55 31.3200 -97.3300 251.000 122.0 135.440 4.660 -999.990 -999.990 1.354 ..P WKT 2010 10 08 20 09 55 31.3200 -97.3300 251.000 457.0 138.034 4.960 -999.990 -999.990 1.380 ..P WKT 2010 10 08 20 14 55 31.3200 -97.3300 251.000 30.0 141.446 4.520 -999.990 -999.990 1.414 ..P WKT 2010 10 08 20 19 55 31.3200 -97.3300 251.000 122.0 151.135 4.300 -999.990 -999.990 1.511 ..P WKT 2010 10 08 20 24 55 31.3200 -97.3300 251.000 457.0 141.995 4.330 -999.990 -999.990 1.420 ..P WKT 2010 10 08 20 34 55 31.3200 -97.3300 251.000 30.0 146.288 4.720 -999.990 -999.990 1.463 ..P WKT 2010 10 08 20 39 55 31.3200 -97.3300 251.000 122.0 146.349 4.640 -999.990 -999.990 1.463 ..P WKT 2010 10 08 20 44 55 31.3200 -97.3300 251.000 457.0 141.633 4.350 -999.990 -999.990 1.416 ..P WKT 2010 10 08 20 49 55 31.3200 -97.3300 251.000 30.0 141.831 5.140 -999.990 -999.990 1.418 ..P WKT 2010 10 08 20 54 55 31.3200 -97.3300 251.000 122.0 147.215 5.110 -999.990 -999.990 1.472 ..P WKT 2010 10 08 20 59 55 31.3200 -97.3300 251.000 457.0 140.996 4.600 -999.990 -999.990 1.410 ..P WKT 2010 10 08 21 09 55 31.3200 -97.3300 251.000 30.0 140.727 3.990 -999.990 -999.990 1.407 ..P WKT 2010 10 08 21 14 55 31.3200 -97.3300 251.000 122.0 144.767 4.280 -999.990 -999.990 1.448 ..P WKT 2010 10 08 21 19 55 31.3200 -97.3300 251.000 457.0 148.398 4.010 -999.990 -999.990 1.484 ..P WKT 2010 10 08 21 24 55 31.3200 -97.3300 251.000 30.0 147.522 4.460 -999.990 -999.990 1.475 ..P WKT 2010 10 08 21 29 55 31.3200 -97.3300 251.000 122.0 149.378 4.890 -999.990 -999.990 1.494 ..P WKT 2010 10 08 21 34 55 31.3200 -97.3300 251.000 457.0 144.133 3.840 -999.990 -999.990 1.441 ..P WKT 2010 10 08 21 44 55 31.3200 -97.3300 251.000 30.0 144.898 4.800 -999.990 -999.990 1.449 ..P WKT 2010 10 08 21 49 55 31.3200 -97.3300 251.000 122.0 155.419 4.150 -999.990 -999.990 1.554 ..P WKT 2010 10 08 21 54 55 31.3200 -97.3300 251.000 457.0 152.007 4.470 -999.990 -999.990 1.520 ..P WKT 2010 10 08 21 59 55 31.3200 -97.3300 251.000 30.0 149.414 5.110 -999.990 -999.990 1.494 ..P WKT 2010 10 08 22 04 55 31.3200 -97.3300 251.000 122.0 152.695 5.250 -999.990 -999.990 1.527 ..P WKT 2010 10 08 22 09 55 31.3200 -97.3300 251.000 457.0 149.828 4.140 -999.990 -999.990 1.498 ..P WKT 2010 10 08 22 19 55 31.3200 -97.3300 251.000 30.0 156.530 4.370 -999.990 -999.990 1.565 ..P WKT 2010 10 08 22 24 55 31.3200 -97.3300 251.000 122.0 153.937 5.100 -999.990 -999.990 1.539 ..P WKT 2010 10 08 22 29 55 31.3200 -97.3300 251.000 457.0 148.335 4.790 -999.990 -999.990 1.483 ..P WKT 2010 10 08 22 34 55 31.3200 -97.3300 251.000 30.0 148.748 4.710 -999.990 -999.990 1.487 ..P WKT 2010 10 08 22 39 55 31.3200 -97.3300 251.000 122.0 149.982 4.540 -999.990 -999.990 1.500 ..P WKT 2010 10 08 22 44 55 31.3200 -97.3300 251.000 457.0 145.746 4.650 -999.990 -999.990 1.457 ..P WKT 2010 10 08 22 54 55 31.3200 -97.3300 251.000 30.0 147.880 4.350 -999.990 -999.990 1.479 ..P WKT 2010 10 08 22 59 55 31.3200 -97.3300 251.000 122.0 143.311 4.780 -999.990 -999.990 1.433 ..P WKT 2010 10 08 23 04 55 31.3200 -97.3300 251.000 457.0 137.101 5.250 -999.990 -999.990 1.371 ..P WKT 2010 10 08 23 09 55 31.3200 -97.3300 251.000 30.0 139.095 5.420 -999.990 -999.990 1.391 ..P WKT 2010 10 08 23 14 55 31.3200 -97.3300 251.000 122.0 137.260 4.350 -999.990 -999.990 1.373 ..P WKT 2010 10 08 23 19 55 31.3200 -97.3300 251.000 457.0 142.538 3.830 -999.990 -999.990 1.425 ..P WKT 2010 10 08 23 29 55 31.3200 -97.3300 251.000 30.0 145.630 5.190 -999.990 -999.990 1.456 ..P WKT 2010 10 08 23 34 55 31.3200 -97.3300 251.000 122.0 145.359 4.490 -999.990 -999.990 1.454 ..P WKT 2010 10 08 23 39 55 31.3200 -97.3300 251.000 457.0 147.003 4.910 -999.990 -999.990 1.470 ..P WKT 2010 10 08 23 44 55 31.3200 -97.3300 251.000 30.0 143.174 5.280 -999.990 -999.990 1.432 ..P WKT 2010 10 08 23 49 55 31.3200 -97.3300 251.000 122.0 142.903 4.030 -999.990 -999.990 1.429 ..P WKT 2010 10 09 00 09 55 31.3200 -97.3300 251.000 457.0 144.153 4.250 -999.990 -999.990 1.442 ..P WKT 2010 10 09 00 10 25 31.3200 -97.3300 251.000 457.0 142.499 4.800 -999.990 -999.990 1.425 ..P WKT 2010 10 09 00 10 55 31.3200 -97.3300 251.000 457.0 139.204 4.400 -999.990 -999.990 1.392 ..P WKT 2010 10 09 00 11 25 31.3200 -97.3300 251.000 457.0 140.013 4.310 -999.990 -999.990 1.400 ..P WKT 2010 10 09 00 11 55 31.3200 -97.3300 251.000 457.0 140.549 4.410 -999.990 -999.990 1.405 ..P WKT 2010 10 09 00 12 25 31.3200 -97.3300 251.000 457.0 141.632 4.540 -999.990 -999.990 1.416 ..P WKT 2010 10 09 00 12 55 31.3200 -97.3300 251.000 457.0 141.074 4.440 -999.990 -999.990 1.411 ..P WKT 2010 10 09 00 13 25 31.3200 -97.3300 251.000 457.0 139.967 4.840 -999.990 -999.990 1.400 ..P WKT 2010 10 09 00 13 55 31.3200 -97.3300 251.000 457.0 134.483 4.230 -999.990 -999.990 1.345 ..P WKT 2010 10 09 00 14 25 31.3200 -97.3300 251.000 457.0 138.302 4.260 -999.990 -999.990 1.383 ..P WKT 2010 10 09 00 14 55 31.3200 -97.3300 251.000 457.0 137.196 4.300 -999.990 -999.990 1.372 ..P WKT 2010 10 09 00 19 55 31.3200 -97.3300 251.000 30.0 136.533 4.560 -999.990 -999.990 1.365 ..P WKT 2010 10 09 00 24 55 31.3200 -97.3300 251.000 122.0 136.965 5.560 -999.990 -999.990 1.370 ..P WKT 2010 10 09 00 29 55 31.3200 -97.3300 251.000 457.0 143.415 4.630 -999.990 -999.990 1.434 ..P WKT 2010 10 09 00 34 55 31.3200 -97.3300 251.000 30.0 140.154 5.060 -999.990 -999.990 1.402 ..P WKT 2010 10 09 00 39 55 31.3200 -97.3300 251.000 122.0 142.500 4.850 -999.990 -999.990 1.425 ..P WKT 2010 10 09 00 44 55 31.3200 -97.3300 251.000 457.0 138.007 4.950 -999.990 -999.990 1.380 ..P WKT 2010 10 09 00 54 55 31.3200 -97.3300 251.000 30.0 142.864 4.940 -999.990 -999.990 1.429 ..P WKT 2010 10 09 00 59 55 31.3200 -97.3300 251.000 122.0 140.588 4.610 -999.990 -999.990 1.406 ..P WKT 2010 10 09 01 04 55 31.3200 -97.3300 251.000 457.0 139.954 4.350 -999.990 -999.990 1.400 ..P WKT 2010 10 09 01 09 55 31.3200 -97.3300 251.000 30.0 146.291 4.630 -999.990 -999.990 1.463 ..P WKT 2010 10 09 01 14 55 31.3200 -97.3300 251.000 122.0 137.591 4.540 -999.990 -999.990 1.376 ..P WKT 2010 10 09 01 19 55 31.3200 -97.3300 251.000 457.0 135.591 3.800 -999.990 -999.990 1.356 ..P WKT 2010 10 09 01 29 55 31.3200 -97.3300 251.000 30.0 151.522 3.900 -999.990 -999.990 1.515 ..P WKT 2010 10 09 01 34 55 31.3200 -97.3300 251.000 122.0 146.221 4.280 -999.990 -999.990 1.462 ..P WKT 2010 10 09 01 39 55 31.3200 -97.3300 251.000 457.0 135.320 5.020 -999.990 -999.990 1.353 ..P WKT 2010 10 09 01 44 55 31.3200 -97.3300 251.000 30.0 148.739 6.710 -999.990 -999.990 1.487 ..P WKT 2010 10 09 01 49 55 31.3200 -97.3300 251.000 122.0 140.434 5.360 -999.990 -999.990 1.404 ..P WKT 2010 10 09 01 54 55 31.3200 -97.3300 251.000 457.0 138.552 4.530 -999.990 -999.990 1.386 ..P WKT 2010 10 09 02 04 55 31.3200 -97.3300 251.000 30.0 160.404 4.940 -999.990 -999.990 1.604 ..P WKT 2010 10 09 02 09 55 31.3200 -97.3300 251.000 122.0 133.608 5.580 -999.990 -999.990 1.336 ..P WKT 2010 10 09 02 14 55 31.3200 -97.3300 251.000 457.0 136.993 6.310 -999.990 -999.990 1.370 ..P WKT 2010 10 09 02 19 55 31.3200 -97.3300 251.000 30.0 183.523 6.120 -999.990 -999.990 1.835 ..P WKT 2010 10 09 02 24 55 31.3200 -97.3300 251.000 122.0 146.629 5.330 -999.990 -999.990 1.466 ..P WKT 2010 10 09 02 29 55 31.3200 -97.3300 251.000 457.0 140.320 4.570 -999.990 -999.990 1.403 ..P WKT 2010 10 09 02 39 55 31.3200 -97.3300 251.000 30.0 191.348 5.410 -999.990 -999.990 1.913 ..P WKT 2010 10 09 02 44 55 31.3200 -97.3300 251.000 122.0 139.630 5.070 -999.990 -999.990 1.396 ..P WKT 2010 10 09 02 49 55 31.3200 -97.3300 251.000 457.0 143.324 5.700 -999.990 -999.990 1.433 ..P WKT 2010 10 09 02 54 55 31.3200 -97.3300 251.000 30.0 166.122 5.260 -999.990 -999.990 1.661 ..P WKT 2010 10 09 02 59 55 31.3200 -97.3300 251.000 122.0 137.068 4.020 -999.990 -999.990 1.371 ..P WKT 2010 10 09 03 04 55 31.3200 -97.3300 251.000 457.0 142.945 4.260 -999.990 -999.990 1.429 ..P WKT 2010 10 09 03 14 55 31.3200 -97.3300 251.000 30.0 162.529 4.280 -999.990 -999.990 1.625 ..P WKT 2010 10 09 03 19 55 31.3200 -97.3300 251.000 122.0 124.678 4.450 -999.990 -999.990 1.247 ..P WKT 2010 10 09 03 24 55 31.3200 -97.3300 251.000 457.0 139.477 3.980 -999.990 -999.990 1.395 ..P WKT 2010 10 09 03 29 55 31.3200 -97.3300 251.000 30.0 182.367 6.020 -999.990 -999.990 1.824 ..P WKT 2010 10 09 03 34 55 31.3200 -97.3300 251.000 122.0 135.251 4.130 -999.990 -999.990 1.353 ..P WKT 2010 10 09 03 39 55 31.3200 -97.3300 251.000 457.0 133.956 4.180 -999.990 -999.990 1.340 ..P WKT 2010 10 09 03 49 55 31.3200 -97.3300 251.000 30.0 179.627 4.820 -999.990 -999.990 1.796 ..P WKT 2010 10 09 03 54 55 31.3200 -97.3300 251.000 122.0 133.891 4.780 -999.990 -999.990 1.339 ..P WKT 2010 10 09 03 59 55 31.3200 -97.3300 251.000 457.0 126.054 5.080 -999.990 -999.990 1.261 ..P WKT 2010 10 09 04 04 55 31.3200 -97.3300 251.000 30.0 156.653 4.630 -999.990 -999.990 1.567 ..P WKT 2010 10 09 04 09 55 31.3200 -97.3300 251.000 122.0 133.825 4.720 -999.990 -999.990 1.338 ..P WKT 2010 10 09 04 14 55 31.3200 -97.3300 251.000 457.0 131.169 4.820 -999.990 -999.990 1.312 ..P WKT 2010 10 09 04 24 55 31.3200 -97.3300 251.000 30.0 151.919 4.940 -999.990 -999.990 1.519 ..P WKT 2010 10 09 04 29 55 31.3200 -97.3300 251.000 122.0 127.367 4.860 -999.990 -999.990 1.274 ..P WKT 2010 10 09 04 34 55 31.3200 -97.3300 251.000 457.0 132.379 4.480 -999.990 -999.990 1.324 ..P WKT 2010 10 09 04 39 55 31.3200 -97.3300 251.000 30.0 149.105 4.550 -999.990 -999.990 1.491 ..P WKT 2010 10 09 04 44 55 31.3200 -97.3300 251.000 122.0 132.731 4.690 -999.990 -999.990 1.327 ..P WKT 2010 10 09 04 49 55 31.3200 -97.3300 251.000 457.0 139.377 4.770 -999.990 -999.990 1.394 ..P WKT 2010 10 09 05 04 55 31.3200 -97.3300 251.000 30.0 155.259 4.530 -999.990 -999.990 1.553 ..P WKT 2010 10 09 05 09 55 31.3200 -97.3300 251.000 122.0 134.759 4.350 -999.990 -999.990 1.348 ..P WKT 2010 10 09 05 14 55 31.3200 -97.3300 251.000 457.0 137.405 5.930 -999.990 -999.990 1.374 ..P WKT 2010 10 09 05 19 55 31.3200 -97.3300 251.000 30.0 150.123 4.770 -999.990 -999.990 1.501 ..P WKT 2010 10 09 05 24 55 31.3200 -97.3300 251.000 122.0 133.984 4.740 -999.990 -999.990 1.340 ..P WKT 2010 10 09 05 29 55 31.3200 -97.3300 251.000 457.0 144.386 4.590 -999.990 -999.990 1.444 ..P WKT 2010 10 09 05 39 55 31.3200 -97.3300 251.000 30.0 153.182 4.890 -999.990 -999.990 1.532 ..P WKT 2010 10 09 05 44 55 31.3200 -97.3300 251.000 122.0 136.067 6.180 -999.990 -999.990 1.361 ..P WKT 2010 10 09 05 49 55 31.3200 -97.3300 251.000 457.0 139.090 4.820 -999.990 -999.990 1.391 ..P WKT 2010 10 09 05 54 55 31.3200 -97.3300 251.000 30.0 146.330 4.400 -999.990 -999.990 1.463 ..P WKT 2010 10 09 05 59 55 31.3200 -97.3300 251.000 122.0 131.668 4.660 -999.990 -999.990 1.317 ..P WKT 2010 10 09 06 04 55 31.3200 -97.3300 251.000 457.0 127.210 4.510 -999.990 -999.990 1.272 ..P WKT 2010 10 09 06 14 55 31.3200 -97.3300 251.000 30.0 142.677 4.340 -999.990 -999.990 1.427 ..P WKT 2010 10 09 06 19 55 31.3200 -97.3300 251.000 122.0 134.858 4.740 -999.990 -999.990 1.349 ..P WKT 2010 10 09 06 24 55 31.3200 -97.3300 251.000 457.0 114.124 5.870 -999.990 -999.990 1.141 ..P WKT 2010 10 09 06 29 55 31.3200 -97.3300 251.000 30.0 144.513 4.180 -999.990 -999.990 1.445 ..P WKT 2010 10 09 06 34 55 31.3200 -97.3300 251.000 122.0 132.753 4.990 -999.990 -999.990 1.328 ..P WKT 2010 10 09 06 39 55 31.3200 -97.3300 251.000 457.0 123.171 4.390 -999.990 -999.990 1.232 ..P WKT 2010 10 09 06 49 55 31.3200 -97.3300 251.000 30.0 148.493 4.420 -999.990 -999.990 1.485 ..P WKT 2010 10 09 06 54 55 31.3200 -97.3300 251.000 122.0 137.999 3.960 -999.990 -999.990 1.380 ..P WKT 2010 10 09 06 59 55 31.3200 -97.3300 251.000 457.0 130.225 3.970 -999.990 -999.990 1.302 ..P WKT 2010 10 09 07 04 55 31.3200 -97.3300 251.000 30.0 156.149 4.010 -999.990 -999.990 1.561 ..P WKT 2010 10 09 07 09 55 31.3200 -97.3300 251.000 122.0 133.701 4.750 -999.990 -999.990 1.337 ..P WKT 2010 10 09 07 14 55 31.3200 -97.3300 251.000 457.0 125.386 4.170 -999.990 -999.990 1.254 ..P WKT 2010 10 09 07 24 55 31.3200 -97.3300 251.000 30.0 149.703 3.950 -999.990 -999.990 1.497 ..P WKT 2010 10 09 07 29 55 31.3200 -97.3300 251.000 122.0 133.162 4.500 -999.990 -999.990 1.332 ..P WKT 2010 10 09 07 34 55 31.3200 -97.3300 251.000 457.0 134.007 3.920 -999.990 -999.990 1.340 ..P WKT 2010 10 09 07 39 55 31.3200 -97.3300 251.000 30.0 152.505 4.750 -999.990 -999.990 1.525 ..P WKT 2010 10 09 07 44 55 31.3200 -97.3300 251.000 122.0 131.079 4.050 -999.990 -999.990 1.311 ..P WKT 2010 10 09 07 49 55 31.3200 -97.3300 251.000 457.0 121.334 4.160 -999.990 -999.990 1.213 ..P WKT 2010 10 09 07 59 55 31.3200 -97.3300 251.000 30.0 165.283 4.260 -999.990 -999.990 1.653 ..P WKT 2010 10 09 08 04 55 31.3200 -97.3300 251.000 122.0 124.762 4.360 -999.990 -999.990 1.248 ..P WKT 2010 10 09 08 09 55 31.3200 -97.3300 251.000 457.0 119.539 4.330 -999.990 -999.990 1.195 ..P WKT 2010 10 09 08 14 55 31.3200 -97.3300 251.000 30.0 164.259 4.420 -999.990 -999.990 1.643 ..P WKT 2010 10 09 08 19 55 31.3200 -97.3300 251.000 122.0 130.806 4.930 -999.990 -999.990 1.308 ..P WKT 2010 10 09 08 24 55 31.3200 -97.3300 251.000 457.0 121.920 3.980 -999.990 -999.990 1.219 ..P WKT 2010 10 09 08 34 55 31.3200 -97.3300 251.000 30.0 180.630 4.220 -999.990 -999.990 1.806 ..P WKT 2010 10 09 08 39 55 31.3200 -97.3300 251.000 122.0 142.265 4.270 -999.990 -999.990 1.423 ..P WKT 2010 10 09 08 44 55 31.3200 -97.3300 251.000 457.0 125.609 4.140 -999.990 -999.990 1.256 ..P WKT 2010 10 09 08 49 55 31.3200 -97.3300 251.000 30.0 193.865 5.200 -999.990 -999.990 1.939 ..P WKT 2010 10 09 08 54 55 31.3200 -97.3300 251.000 122.0 141.267 3.960 -999.990 -999.990 1.413 ..P WKT 2010 10 09 08 59 55 31.3200 -97.3300 251.000 457.0 126.650 4.340 -999.990 -999.990 1.267 ..P WKT 2010 10 09 09 09 55 31.3200 -97.3300 251.000 30.0 187.766 3.770 -999.990 -999.990 1.878 ..P WKT 2010 10 09 09 14 55 31.3200 -97.3300 251.000 122.0 138.615 4.320 -999.990 -999.990 1.386 ..P WKT 2010 10 09 09 19 55 31.3200 -97.3300 251.000 457.0 121.059 4.390 -999.990 -999.990 1.211 ..P WKT 2010 10 09 09 24 55 31.3200 -97.3300 251.000 30.0 185.247 4.280 -999.990 -999.990 1.852 ..P WKT 2010 10 09 09 29 55 31.3200 -97.3300 251.000 122.0 138.684 4.370 -999.990 -999.990 1.387 ..P WKT 2010 10 09 09 34 55 31.3200 -97.3300 251.000 457.0 123.165 4.800 -999.990 -999.990 1.232 ..P WKT 2010 10 09 09 44 55 31.3200 -97.3300 251.000 30.0 184.343 4.280 -999.990 -999.990 1.843 ..P WKT 2010 10 09 09 49 55 31.3200 -97.3300 251.000 122.0 137.176 4.010 -999.990 -999.990 1.372 ..P WKT 2010 10 09 09 54 55 31.3200 -97.3300 251.000 457.0 130.663 4.150 -999.990 -999.990 1.307 ..P WKT 2010 10 09 09 59 55 31.3200 -97.3300 251.000 30.0 176.175 5.050 -999.990 -999.990 1.762 ..P WKT 2010 10 09 10 04 55 31.3200 -97.3300 251.000 122.0 128.614 4.500 -999.990 -999.990 1.286 ..P WKT 2010 10 09 10 09 55 31.3200 -97.3300 251.000 457.0 129.554 3.830 -999.990 -999.990 1.296 ..P WKT 2010 10 09 10 19 55 31.3200 -97.3300 251.000 30.0 177.751 4.960 -999.990 -999.990 1.778 ..P WKT 2010 10 09 10 24 55 31.3200 -97.3300 251.000 122.0 140.362 4.330 -999.990 -999.990 1.404 ..P WKT 2010 10 09 10 29 55 31.3200 -97.3300 251.000 457.0 126.270 3.850 -999.990 -999.990 1.263 ..P WKT 2010 10 09 10 34 55 31.3200 -97.3300 251.000 30.0 170.944 4.230 -999.990 -999.990 1.709 ..P WKT 2010 10 09 10 39 55 31.3200 -97.3300 251.000 122.0 135.460 4.040 -999.990 -999.990 1.355 ..P WKT 2010 10 09 10 44 55 31.3200 -97.3300 251.000 457.0 133.285 3.790 -999.990 -999.990 1.333 ..P WKT 2010 10 09 10 54 55 31.3200 -97.3300 251.000 30.0 171.669 4.150 -999.990 -999.990 1.717 ..P WKT 2010 10 09 10 59 55 31.3200 -97.3300 251.000 122.0 141.302 4.060 -999.990 -999.990 1.413 ..P WKT 2010 10 09 11 04 55 31.3200 -97.3300 251.000 457.0 118.519 3.930 -999.990 -999.990 1.185 ..P WKT 2010 10 09 11 09 55 31.3200 -97.3300 251.000 30.0 154.196 4.680 -999.990 -999.990 1.542 ..P WKT 2010 10 09 11 14 55 31.3200 -97.3300 251.000 122.0 133.039 4.130 -999.990 -999.990 1.330 ..P WKT 2010 10 09 11 19 55 31.3200 -97.3300 251.000 457.0 119.192 4.410 -999.990 -999.990 1.192 ..P WKT 2010 10 09 11 29 55 31.3200 -97.3300 251.000 30.0 155.358 4.350 -999.990 -999.990 1.554 ..P WKT 2010 10 09 11 34 55 31.3200 -97.3300 251.000 122.0 140.705 4.060 -999.990 -999.990 1.407 ..P WKT 2010 10 09 11 39 55 31.3200 -97.3300 251.000 457.0 118.210 4.420 -999.990 -999.990 1.182 ..P WKT 2010 10 09 11 44 55 31.3200 -97.3300 251.000 30.0 158.740 4.770 -999.990 -999.990 1.587 ..P WKT 2010 10 09 11 49 55 31.3200 -97.3300 251.000 122.0 140.576 3.770 -999.990 -999.990 1.406 ..P WKT 2010 10 09 12 09 55 31.3200 -97.3300 251.000 457.0 114.266 3.720 -999.990 -999.990 1.143 ..P WKT 2010 10 09 12 10 25 31.3200 -97.3300 251.000 457.0 114.512 3.800 -999.990 -999.990 1.145 ..P WKT 2010 10 09 12 10 55 31.3200 -97.3300 251.000 457.0 119.357 3.700 -999.990 -999.990 1.194 ..P WKT 2010 10 09 12 11 25 31.3200 -97.3300 251.000 457.0 120.957 3.870 -999.990 -999.990 1.210 ..P WKT 2010 10 09 12 11 55 31.3200 -97.3300 251.000 457.0 117.687 4.340 -999.990 -999.990 1.177 ..P WKT 2010 10 09 12 12 25 31.3200 -97.3300 251.000 457.0 120.369 4.240 -999.990 -999.990 1.204 ..P WKT 2010 10 09 12 12 55 31.3200 -97.3300 251.000 457.0 114.395 4.620 -999.990 -999.990 1.144 ..P WKT 2010 10 09 12 13 25 31.3200 -97.3300 251.000 457.0 111.667 3.700 -999.990 -999.990 1.117 ..P WKT 2010 10 09 12 13 55 31.3200 -97.3300 251.000 457.0 117.053 3.790 -999.990 -999.990 1.171 ..P WKT 2010 10 09 12 14 25 31.3200 -97.3300 251.000 457.0 116.894 3.820 -999.990 -999.990 1.169 ..P WKT 2010 10 09 12 14 55 31.3200 -97.3300 251.000 457.0 112.949 4.410 -999.990 -999.990 1.129 ..P WKT 2010 10 09 12 19 55 31.3200 -97.3300 251.000 30.0 151.668 3.890 -999.990 -999.990 1.517 ..P WKT 2010 10 09 12 24 55 31.3200 -97.3300 251.000 122.0 121.406 4.020 -999.990 -999.990 1.214 ..P WKT 2010 10 09 12 29 55 31.3200 -97.3300 251.000 457.0 114.136 3.730 -999.990 -999.990 1.141 ..P WKT 2010 10 09 12 34 55 31.3200 -97.3300 251.000 30.0 146.509 4.160 -999.990 -999.990 1.465 ..P WKT 2010 10 09 12 39 55 31.3200 -97.3300 251.000 122.0 125.708 4.070 -999.990 -999.990 1.257 ..P WKT 2010 10 09 12 44 55 31.3200 -97.3300 251.000 457.0 111.806 4.710 -999.990 -999.990 1.118 ..P WKT 2010 10 09 12 54 55 31.3200 -97.3300 251.000 30.0 151.622 3.870 -999.990 -999.990 1.516 ..P WKT 2010 10 09 12 59 55 31.3200 -97.3300 251.000 122.0 125.215 3.590 -999.990 -999.990 1.252 ..P WKT 2010 10 09 13 04 55 31.3200 -97.3300 251.000 457.0 114.371 4.460 -999.990 -999.990 1.144 ..P WKT 2010 10 09 13 09 55 31.3200 -97.3300 251.000 30.0 147.529 4.700 -999.990 -999.990 1.475 ..P WKT 2010 10 09 13 14 55 31.3200 -97.3300 251.000 122.0 123.551 4.690 -999.990 -999.990 1.236 ..P WKT 2010 10 09 13 19 55 31.3200 -97.3300 251.000 457.0 109.047 3.700 -999.990 -999.990 1.090 ..P WKT 2010 10 09 13 29 55 31.3200 -97.3300 251.000 30.0 138.372 3.500 -999.990 -999.990 1.384 ..P WKT 2010 10 09 13 34 55 31.3200 -97.3300 251.000 122.0 122.608 4.540 -999.990 -999.990 1.226 ..P WKT 2010 10 09 13 39 55 31.3200 -97.3300 251.000 457.0 111.853 3.900 -999.990 -999.990 1.119 ..P WKT 2010 10 09 13 44 55 31.3200 -97.3300 251.000 30.0 147.977 4.480 -999.990 -999.990 1.480 ..P WKT 2010 10 09 13 49 55 31.3200 -97.3300 251.000 122.0 130.176 4.660 -999.990 -999.990 1.302 ..P WKT 2010 10 09 13 54 55 31.3200 -97.3300 251.000 457.0 116.031 4.960 -999.990 -999.990 1.160 ..P WKT 2010 10 09 14 04 55 31.3200 -97.3300 251.000 30.0 135.676 5.170 -999.990 -999.990 1.357 ..P WKT 2010 10 09 14 09 55 31.3200 -97.3300 251.000 122.0 130.571 5.900 -999.990 -999.990 1.306 ..P WKT 2010 10 09 14 14 55 31.3200 -97.3300 251.000 457.0 118.009 4.180 -999.990 -999.990 1.180 ..P WKT 2010 10 09 14 19 55 31.3200 -97.3300 251.000 30.0 139.069 4.810 -999.990 -999.990 1.391 ..P WKT 2010 10 09 14 24 55 31.3200 -97.3300 251.000 122.0 131.387 3.840 -999.990 -999.990 1.314 ..P WKT 2010 10 09 14 29 55 31.3200 -97.3300 251.000 457.0 116.108 4.070 -999.990 -999.990 1.161 ..P WKT 2010 10 09 14 39 55 31.3200 -97.3300 251.000 30.0 136.407 3.590 -999.990 -999.990 1.364 ..P WKT 2010 10 09 14 44 55 31.3200 -97.3300 251.000 122.0 136.182 3.850 -999.990 -999.990 1.362 ..P WKT 2010 10 09 14 49 55 31.3200 -97.3300 251.000 457.0 116.963 3.740 -999.990 -999.990 1.170 ..P WKT 2010 10 09 14 54 55 31.3200 -97.3300 251.000 30.0 137.632 4.390 -999.990 -999.990 1.376 ..P WKT 2010 10 09 14 59 55 31.3200 -97.3300 251.000 122.0 130.893 3.400 -999.990 -999.990 1.309 ..P WKT 2010 10 09 15 04 55 31.3200 -97.3300 251.000 457.0 110.581 3.690 -999.990 -999.990 1.106 ..P WKT 2010 10 09 15 14 55 31.3200 -97.3300 251.000 30.0 133.086 4.930 -999.990 -999.990 1.331 ..P WKT 2010 10 09 15 19 55 31.3200 -97.3300 251.000 122.0 136.545 3.830 -999.990 -999.990 1.365 ..P WKT 2010 10 09 15 24 55 31.3200 -97.3300 251.000 457.0 118.553 4.210 -999.990 -999.990 1.186 ..P WKT 2010 10 09 15 29 55 31.3200 -97.3300 251.000 30.0 131.517 3.950 -999.990 -999.990 1.315 ..P WKT 2010 10 09 15 34 55 31.3200 -97.3300 251.000 122.0 131.446 4.790 -999.990 -999.990 1.314 ..P WKT 2010 10 09 15 39 55 31.3200 -97.3300 251.000 457.0 114.807 4.450 -999.990 -999.990 1.148 ..P WKT 2010 10 09 15 49 55 31.3200 -97.3300 251.000 30.0 132.574 4.470 -999.990 -999.990 1.326 ..P WKT 2010 10 09 15 54 55 31.3200 -97.3300 251.000 122.0 136.831 4.240 -999.990 -999.990 1.368 ..P WKT 2010 10 09 15 59 55 31.3200 -97.3300 251.000 457.0 125.601 4.210 -999.990 -999.990 1.256 ..P WKT 2010 10 09 16 04 55 31.3200 -97.3300 251.000 30.0 134.750 4.070 -999.990 -999.990 1.347 ..P WKT 2010 10 09 16 09 55 31.3200 -97.3300 251.000 122.0 134.117 4.360 -999.990 -999.990 1.341 ..P WKT 2010 10 09 16 14 55 31.3200 -97.3300 251.000 457.0 135.114 4.430 -999.990 -999.990 1.351 ..P WKT 2010 10 09 16 24 55 31.3200 -97.3300 251.000 30.0 136.507 5.060 -999.990 -999.990 1.365 ..P WKT 2010 10 09 16 29 55 31.3200 -97.3300 251.000 122.0 129.835 4.510 -999.990 -999.990 1.298 ..P WKT 2010 10 09 16 34 55 31.3200 -97.3300 251.000 457.0 130.230 4.430 -999.990 -999.990 1.302 ..P WKT 2010 10 09 16 39 55 31.3200 -97.3300 251.000 30.0 121.515 4.120 -999.990 -999.990 1.215 ..P WKT 2010 10 09 16 44 55 31.3200 -97.3300 251.000 122.0 125.717 4.310 -999.990 -999.990 1.257 ..P WKT 2010 10 09 16 49 55 31.3200 -97.3300 251.000 457.0 125.568 4.160 -999.990 -999.990 1.256 ..P WKT 2010 10 09 17 04 55 31.3200 -97.3300 251.000 30.0 113.290 3.940 -999.990 -999.990 1.133 ..P WKT 2010 10 09 17 09 55 31.3200 -97.3300 251.000 122.0 126.476 4.960 -999.990 -999.990 1.265 ..P WKT 2010 10 09 17 14 55 31.3200 -97.3300 251.000 457.0 124.152 4.970 -999.990 -999.990 1.242 ..P WKT 2010 10 09 17 19 55 31.3200 -97.3300 251.000 30.0 116.520 4.100 -999.990 -999.990 1.165 ..P WKT 2010 10 09 17 24 55 31.3200 -97.3300 251.000 122.0 117.870 4.510 -999.990 -999.990 1.179 ..P WKT 2010 10 09 17 29 55 31.3200 -97.3300 251.000 457.0 121.534 4.080 -999.990 -999.990 1.215 ..P WKT 2010 10 09 17 39 55 31.3200 -97.3300 251.000 30.0 120.712 4.950 -999.990 -999.990 1.207 ..P WKT 2010 10 09 17 44 55 31.3200 -97.3300 251.000 122.0 124.939 4.260 -999.990 -999.990 1.249 ..P WKT 2010 10 09 17 49 55 31.3200 -97.3300 251.000 457.0 127.532 4.000 -999.990 -999.990 1.275 ..P WKT 2010 10 09 17 54 55 31.3200 -97.3300 251.000 30.0 127.131 3.950 -999.990 -999.990 1.271 ..P WKT 2010 10 09 17 59 55 31.3200 -97.3300 251.000 122.0 125.775 3.890 -999.990 -999.990 1.258 ..P WKT 2010 10 09 18 04 55 31.3200 -97.3300 251.000 457.0 113.659 4.190 -999.990 -999.990 1.137 ..P WKT 2010 10 09 18 14 55 31.3200 -97.3300 251.000 30.0 116.920 4.010 -999.990 -999.990 1.169 ..P WKT 2010 10 09 18 19 55 31.3200 -97.3300 251.000 122.0 124.400 4.020 -999.990 -999.990 1.244 ..P WKT 2010 10 09 18 24 55 31.3200 -97.3300 251.000 457.0 126.158 4.110 -999.990 -999.990 1.262 ..P WKT 2010 10 09 18 29 55 31.3200 -97.3300 251.000 30.0 114.834 4.920 -999.990 -999.990 1.148 ..P WKT 2010 10 09 18 34 55 31.3200 -97.3300 251.000 122.0 117.955 4.070 -999.990 -999.990 1.180 ..P WKT 2010 10 09 18 39 55 31.3200 -97.3300 251.000 457.0 115.351 4.730 -999.990 -999.990 1.154 ..P WKT 2010 10 09 18 49 55 31.3200 -97.3300 251.000 30.0 117.622 4.230 -999.990 -999.990 1.176 ..P WKT 2010 10 09 18 54 55 31.3200 -97.3300 251.000 122.0 120.315 3.940 -999.990 -999.990 1.203 ..P WKT 2010 10 09 18 59 55 31.3200 -97.3300 251.000 457.0 117.282 4.480 -999.990 -999.990 1.173 ..P WKT 2010 10 09 19 04 55 31.3200 -97.3300 251.000 30.0 109.612 4.090 -999.990 -999.990 1.096 ..P WKT 2010 10 09 19 09 55 31.3200 -97.3300 251.000 122.0 113.124 4.820 -999.990 -999.990 1.131 ..P WKT 2010 10 09 19 14 55 31.3200 -97.3300 251.000 457.0 105.179 4.170 -999.990 -999.990 1.052 ..P WKT 2010 10 09 19 24 55 31.3200 -97.3300 251.000 30.0 109.592 4.650 -999.990 -999.990 1.096 ..P WKT 2010 10 09 19 29 55 31.3200 -97.3300 251.000 122.0 111.585 4.600 -999.990 -999.990 1.116 ..P WKT 2010 10 09 19 34 55 31.3200 -97.3300 251.000 457.0 110.849 5.260 -999.990 -999.990 1.108 ..P WKT 2010 10 09 19 39 55 31.3200 -97.3300 251.000 30.0 110.660 5.480 -999.990 -999.990 1.107 ..P WKT 2010 10 09 19 44 55 31.3200 -97.3300 251.000 122.0 113.472 4.930 -999.990 -999.990 1.135 ..P WKT 2010 10 09 19 49 55 31.3200 -97.3300 251.000 457.0 116.286 4.970 -999.990 -999.990 1.163 ..P WKT 2010 10 09 19 59 55 31.3200 -97.3300 251.000 30.0 109.470 5.000 -999.990 -999.990 1.095 ..P WKT 2010 10 09 20 04 55 31.3200 -97.3300 251.000 122.0 112.401 4.970 -999.990 -999.990 1.124 ..P WKT 2010 10 09 20 09 55 31.3200 -97.3300 251.000 457.0 113.421 4.930 -999.990 -999.990 1.134 ..P WKT 2010 10 09 20 14 55 31.3200 -97.3300 251.000 30.0 120.859 5.610 -999.990 -999.990 1.209 ..P WKT 2010 10 09 20 19 55 31.3200 -97.3300 251.000 122.0 124.748 4.340 -999.990 -999.990 1.247 ..P WKT 2010 10 09 20 24 55 31.3200 -97.3300 251.000 457.0 122.491 4.180 -999.990 -999.990 1.225 ..P WKT 2010 10 09 20 34 55 31.3200 -97.3300 251.000 30.0 115.789 4.620 -999.990 -999.990 1.158 ..P WKT 2010 10 09 20 39 55 31.3200 -97.3300 251.000 122.0 122.822 4.160 -999.990 -999.990 1.228 ..P WKT 2010 10 09 20 44 55 31.3200 -97.3300 251.000 457.0 116.737 4.340 -999.990 -999.990 1.167 ..P WKT 2010 10 09 20 49 55 31.3200 -97.3300 251.000 30.0 117.348 4.900 -999.990 -999.990 1.173 ..P WKT 2010 10 09 20 54 55 31.3200 -97.3300 251.000 122.0 118.505 4.550 -999.990 -999.990 1.185 ..P WKT 2010 10 09 20 59 55 31.3200 -97.3300 251.000 457.0 113.922 5.680 -999.990 -999.990 1.139 ..P WKT 2010 10 09 21 09 55 31.3200 -97.3300 251.000 30.0 116.843 5.180 -999.990 -999.990 1.168 ..P WKT 2010 10 09 21 14 55 31.3200 -97.3300 251.000 122.0 124.076 4.810 -999.990 -999.990 1.241 ..P WKT 2010 10 09 21 19 55 31.3200 -97.3300 251.000 457.0 117.499 4.820 -999.990 -999.990 1.175 ..P WKT 2010 10 09 21 24 55 31.3200 -97.3300 251.000 30.0 109.279 4.800 -999.990 -999.990 1.093 ..P WKT 2010 10 09 21 29 55 31.3200 -97.3300 251.000 122.0 116.925 4.690 -999.990 -999.990 1.169 ..P WKT 2010 10 09 21 34 55 31.3200 -97.3300 251.000 457.0 116.774 6.050 -999.990 -999.990 1.168 ..P WKT 2010 10 09 21 44 55 31.3200 -97.3300 251.000 30.0 120.988 4.170 -999.990 -999.990 1.210 ..P WKT 2010 10 09 21 49 55 31.3200 -97.3300 251.000 122.0 120.290 4.280 -999.990 -999.990 1.203 ..P WKT 2010 10 09 21 54 55 31.3200 -97.3300 251.000 457.0 115.624 3.980 -999.990 -999.990 1.156 ..P WKT 2010 10 09 21 59 55 31.3200 -97.3300 251.000 30.0 115.062 4.370 -999.990 -999.990 1.151 ..P WKT 2010 10 09 22 04 55 31.3200 -97.3300 251.000 122.0 112.447 4.630 -999.990 -999.990 1.124 ..P WKT 2010 10 09 22 09 55 31.3200 -97.3300 251.000 457.0 111.200 5.750 -999.990 -999.990 1.112 ..P WKT 2010 10 09 22 19 55 31.3200 -97.3300 251.000 30.0 106.868 3.890 -999.990 -999.990 1.069 ..P WKT 2010 10 09 22 24 55 31.3200 -97.3300 251.000 122.0 113.642 4.480 -999.990 -999.990 1.136 ..P WKT 2010 10 09 22 29 55 31.3200 -97.3300 251.000 457.0 111.377 5.460 -999.990 -999.990 1.114 ..P WKT 2010 10 09 22 34 55 31.3200 -97.3300 251.000 30.0 103.360 4.570 -999.990 -999.990 1.034 ..P WKT 2010 10 09 22 39 55 31.3200 -97.3300 251.000 122.0 107.670 4.450 -999.990 -999.990 1.077 ..P WKT 2010 10 09 22 44 55 31.3200 -97.3300 251.000 457.0 111.157 5.050 -999.990 -999.990 1.112 ..P WKT 2010 10 09 22 54 55 31.3200 -97.3300 251.000 30.0 101.655 4.440 -999.990 -999.990 1.017 ..P WKT 2010 10 09 22 59 55 31.3200 -97.3300 251.000 122.0 106.475 5.000 -999.990 -999.990 1.065 ..P WKT 2010 10 09 23 04 55 31.3200 -97.3300 251.000 457.0 107.458 4.780 -999.990 -999.990 1.075 ..P WKT 2010 10 09 23 09 55 31.3200 -97.3300 251.000 30.0 98.573 4.360 -999.990 -999.990 0.986 ..P WKT 2010 10 09 23 14 55 31.3200 -97.3300 251.000 122.0 105.040 4.220 -999.990 -999.990 1.050 ..P WKT 2010 10 09 23 19 55 31.3200 -97.3300 251.000 457.0 106.023 4.970 -999.990 -999.990 1.060 ..P WKT 2010 10 09 23 29 55 31.3200 -97.3300 251.000 30.0 103.360 4.660 -999.990 -999.990 1.034 ..P WKT 2010 10 09 23 34 55 31.3200 -97.3300 251.000 122.0 110.684 5.090 -999.990 -999.990 1.107 ..P WKT 2010 10 09 23 39 55 31.3200 -97.3300 251.000 457.0 108.683 4.240 -999.990 -999.990 1.087 ..P WKT 2010 10 09 23 44 55 31.3200 -97.3300 251.000 30.0 106.408 4.200 -999.990 -999.990 1.064 ..P WKT 2010 10 09 23 49 55 31.3200 -97.3300 251.000 122.0 110.442 4.570 -999.990 -999.990 1.104 ..P WKT 2010 10 10 00 09 55 31.3200 -97.3300 251.000 457.0 103.619 4.790 -999.990 -999.990 1.036 ..P WKT 2010 10 10 00 10 25 31.3200 -97.3300 251.000 457.0 104.937 4.550 -999.990 -999.990 1.049 ..P WKT 2010 10 10 00 10 55 31.3200 -97.3300 251.000 457.0 101.865 4.290 -999.990 -999.990 1.019 ..P WKT 2010 10 10 00 11 25 31.3200 -97.3300 251.000 457.0 103.458 4.260 -999.990 -999.990 1.035 ..P WKT 2010 10 10 00 11 55 31.3200 -97.3300 251.000 457.0 105.326 4.530 -999.990 -999.990 1.053 ..P WKT 2010 10 10 00 12 25 31.3200 -97.3300 251.000 457.0 106.233 4.470 -999.990 -999.990 1.062 ..P WKT 2010 10 10 00 12 55 31.3200 -97.3300 251.000 457.0 106.179 4.470 -999.990 -999.990 1.062 ..P WKT 2010 10 10 00 13 25 31.3200 -97.3300 251.000 457.0 104.204 4.250 -999.990 -999.990 1.042 ..P WKT 2010 10 10 00 13 55 31.3200 -97.3300 251.000 457.0 105.112 4.430 -999.990 -999.990 1.051 ..P WKT 2010 10 10 00 14 25 31.3200 -97.3300 251.000 457.0 101.627 4.940 -999.990 -999.990 1.016 ..P WKT 2010 10 10 00 14 55 31.3200 -97.3300 251.000 457.0 103.220 4.510 -999.990 -999.990 1.032 ..P WKT 2010 10 10 00 19 55 31.3200 -97.3300 251.000 30.0 98.706 4.480 -999.990 -999.990 0.987 ..P WKT 2010 10 10 00 24 55 31.3200 -97.3300 251.000 122.0 110.933 5.320 -999.990 -999.990 1.109 ..P WKT 2010 10 10 00 29 55 31.3200 -97.3300 251.000 457.0 101.752 4.600 -999.990 -999.990 1.018 ..P WKT 2010 10 10 00 34 55 31.3200 -97.3300 251.000 30.0 107.942 4.490 -999.990 -999.990 1.079 ..P WKT 2010 10 10 00 39 55 31.3200 -97.3300 251.000 122.0 111.112 4.520 -999.990 -999.990 1.111 ..P WKT 2010 10 10 00 44 55 31.3200 -97.3300 251.000 457.0 97.125 4.730 -999.990 -999.990 0.971 ..P WKT 2010 10 10 00 54 55 31.3200 -97.3300 251.000 30.0 110.236 5.170 -999.990 -999.990 1.102 ..P WKT 2010 10 10 00 59 55 31.3200 -97.3300 251.000 122.0 108.235 4.440 -999.990 -999.990 1.082 ..P WKT 2010 10 10 01 04 55 31.3200 -97.3300 251.000 457.0 106.507 5.920 -999.990 -999.990 1.065 ..P WKT 2010 10 10 01 09 55 31.3200 -97.3300 251.000 30.0 111.918 5.060 -999.990 -999.990 1.119 ..P WKT 2010 10 10 01 14 55 31.3200 -97.3300 251.000 122.0 101.817 5.120 -999.990 -999.990 1.018 ..P WKT 2010 10 10 01 19 55 31.3200 -97.3300 251.000 457.0 117.113 4.930 -999.990 -999.990 1.171 ..P WKT 2010 10 10 01 29 55 31.3200 -97.3300 251.000 30.0 110.835 4.280 -999.990 -999.990 1.108 ..P WKT 2010 10 10 01 34 55 31.3200 -97.3300 251.000 122.0 106.282 4.580 -999.990 -999.990 1.063 ..P WKT 2010 10 10 01 39 55 31.3200 -97.3300 251.000 457.0 112.303 4.590 -999.990 -999.990 1.123 ..P WKT 2010 10 10 01 44 55 31.3200 -97.3300 251.000 30.0 116.264 4.890 -999.990 -999.990 1.163 ..P WKT 2010 10 10 01 49 55 31.3200 -97.3300 251.000 122.0 119.952 4.870 -999.990 -999.990 1.200 ..P WKT 2010 10 10 01 54 55 31.3200 -97.3300 251.000 457.0 117.871 5.360 -999.990 -999.990 1.179 ..P WKT 2010 10 10 02 04 55 31.3200 -97.3300 251.000 30.0 111.590 6.040 -999.990 -999.990 1.116 ..P WKT 2010 10 10 02 09 55 31.3200 -97.3300 251.000 122.0 104.368 4.680 -999.990 -999.990 1.044 ..P WKT 2010 10 10 02 14 55 31.3200 -97.3300 251.000 457.0 120.222 5.100 -999.990 -999.990 1.202 ..P WKT 2010 10 10 02 19 55 31.3200 -97.3300 251.000 30.0 112.450 6.450 -999.990 -999.990 1.125 ..P WKT 2010 10 10 02 24 55 31.3200 -97.3300 251.000 122.0 112.920 4.580 -999.990 -999.990 1.129 ..P WKT 2010 10 10 02 29 55 31.3200 -97.3300 251.000 457.0 110.092 4.530 -999.990 -999.990 1.101 ..P WKT 2010 10 10 02 39 55 31.3200 -97.3300 251.000 30.0 117.116 4.490 -999.990 -999.990 1.171 ..P WKT 2010 10 10 02 44 55 31.3200 -97.3300 251.000 122.0 104.434 4.600 -999.990 -999.990 1.044 ..P WKT 2010 10 10 02 49 55 31.3200 -97.3300 251.000 457.0 109.066 5.160 -999.990 -999.990 1.091 ..P WKT 2010 10 10 02 54 55 31.3200 -97.3300 251.000 30.0 122.767 5.190 -999.990 -999.990 1.228 ..P WKT 2010 10 10 02 59 55 31.3200 -97.3300 251.000 122.0 101.838 5.280 -999.990 -999.990 1.018 ..P WKT 2010 10 10 03 04 55 31.3200 -97.3300 251.000 457.0 106.745 5.490 -999.990 -999.990 1.067 ..P WKT 2010 10 10 03 14 55 31.3200 -97.3300 251.000 30.0 124.178 5.500 -999.990 -999.990 1.242 ..P WKT 2010 10 10 03 19 55 31.3200 -97.3300 251.000 122.0 102.067 5.360 -999.990 -999.990 1.021 ..P WKT 2010 10 10 03 24 55 31.3200 -97.3300 251.000 457.0 107.720 5.070 -999.990 -999.990 1.077 ..P WKT 2010 10 10 03 29 55 31.3200 -97.3300 251.000 30.0 123.822 5.830 -999.990 -999.990 1.238 ..P WKT 2010 10 10 03 34 55 31.3200 -97.3300 251.000 122.0 104.732 5.370 -999.990 -999.990 1.047 ..P WKT 2010 10 10 03 39 55 31.3200 -97.3300 251.000 457.0 104.887 5.610 -999.990 -999.990 1.049 ..P WKT 2010 10 10 03 49 55 31.3200 -97.3300 251.000 30.0 122.993 4.830 -999.990 -999.990 1.230 ..P WKT 2010 10 10 03 54 55 31.3200 -97.3300 251.000 122.0 112.071 4.480 -999.990 -999.990 1.121 ..P WKT 2010 10 10 03 59 55 31.3200 -97.3300 251.000 457.0 105.549 4.790 -999.990 -999.990 1.055 ..P WKT 2010 10 10 04 04 55 31.3200 -97.3300 251.000 30.0 119.377 4.920 -999.990 -999.990 1.194 ..P WKT 2010 10 10 04 09 55 31.3200 -97.3300 251.000 122.0 109.141 4.850 -999.990 -999.990 1.091 ..P WKT 2010 10 10 04 14 55 31.3200 -97.3300 251.000 457.0 103.305 4.670 -999.990 -999.990 1.033 ..P WKT 2010 10 10 04 24 55 31.3200 -97.3300 251.000 30.0 118.194 4.630 -999.990 -999.990 1.182 ..P WKT 2010 10 10 04 29 55 31.3200 -97.3300 251.000 122.0 104.124 4.670 -999.990 -999.990 1.041 ..P WKT 2010 10 10 04 34 55 31.3200 -97.3300 251.000 457.0 102.295 5.040 -999.990 -999.990 1.023 ..P WKT 2010 10 10 04 39 55 31.3200 -97.3300 251.000 30.0 115.184 5.330 -999.990 -999.990 1.152 ..P WKT 2010 10 10 04 44 55 31.3200 -97.3300 251.000 122.0 107.991 4.830 -999.990 -999.990 1.080 ..P WKT 2010 10 10 04 49 55 31.3200 -97.3300 251.000 457.0 100.384 5.710 -999.990 -999.990 1.004 ..P WKT 2010 10 10 05 04 55 31.3200 -97.3300 251.000 30.0 105.670 5.000 -999.990 -999.990 1.057 ..P WKT 2010 10 10 05 09 55 31.3200 -97.3300 251.000 122.0 105.515 5.260 -999.990 -999.990 1.055 ..P WKT 2010 10 10 05 14 55 31.3200 -97.3300 251.000 457.0 108.935 4.920 -999.990 -999.990 1.089 ..P WKT 2010 10 10 05 19 55 31.3200 -97.3300 251.000 30.0 114.971 5.270 -999.990 -999.990 1.150 ..P WKT 2010 10 10 05 24 55 31.3200 -97.3300 251.000 122.0 109.999 5.240 -999.990 -999.990 1.100 ..P WKT 2010 10 10 05 29 55 31.3200 -97.3300 251.000 457.0 108.330 4.970 -999.990 -999.990 1.083 ..P WKT 2010 10 10 05 39 55 31.3200 -97.3300 251.000 30.0 121.305 5.050 -999.990 -999.990 1.213 ..P WKT 2010 10 10 05 44 55 31.3200 -97.3300 251.000 122.0 111.866 4.760 -999.990 -999.990 1.119 ..P WKT 2010 10 10 05 49 55 31.3200 -97.3300 251.000 457.0 111.649 5.440 -999.990 -999.990 1.116 ..P WKT 2010 10 10 05 54 55 31.3200 -97.3300 251.000 30.0 124.645 5.510 -999.990 -999.990 1.246 ..P WKT 2010 10 10 05 59 55 31.3200 -97.3300 251.000 122.0 120.298 5.270 -999.990 -999.990 1.203 ..P WKT 2010 10 10 06 04 55 31.3200 -97.3300 251.000 457.0 105.489 6.510 -999.990 -999.990 1.055 ..P WKT 2010 10 10 06 14 55 31.3200 -97.3300 251.000 30.0 115.221 4.590 -999.990 -999.990 1.152 ..P WKT 2010 10 10 06 19 55 31.3200 -97.3300 251.000 122.0 115.810 5.620 -999.990 -999.990 1.158 ..P WKT 2010 10 10 06 24 55 31.3200 -97.3300 251.000 457.0 98.225 4.690 -999.990 -999.990 0.982 ..P WKT 2010 10 10 06 29 55 31.3200 -97.3300 251.000 30.0 119.191 4.890 -999.990 -999.990 1.192 ..P WKT 2010 10 10 06 34 55 31.3200 -97.3300 251.000 122.0 116.200 5.050 -999.990 -999.990 1.162 ..P WKT 2010 10 10 06 39 55 31.3200 -97.3300 251.000 457.0 99.990 5.760 -999.990 -999.990 1.000 ..P WKT 2010 10 10 06 49 55 31.3200 -97.3300 251.000 30.0 119.974 5.180 -999.990 -999.990 1.200 ..P WKT 2010 10 10 06 54 55 31.3200 -97.3300 251.000 122.0 122.845 5.110 -999.990 -999.990 1.228 ..P WKT 2010 10 10 06 59 55 31.3200 -97.3300 251.000 457.0 111.394 5.060 -999.990 -999.990 1.114 ..P WKT 2010 10 10 07 04 55 31.3200 -97.3300 251.000 30.0 116.744 5.350 -999.990 -999.990 1.167 ..P WKT 2010 10 10 07 09 55 31.3200 -97.3300 251.000 122.0 114.383 5.110 -999.990 -999.990 1.144 ..P WKT 2010 10 10 07 14 55 31.3200 -97.3300 251.000 457.0 110.092 4.960 -999.990 -999.990 1.101 ..P WKT 2010 10 10 07 24 55 31.3200 -97.3300 251.000 30.0 113.729 5.160 -999.990 -999.990 1.137 ..P WKT 2010 10 10 07 29 55 31.3200 -97.3300 251.000 122.0 116.425 4.820 -999.990 -999.990 1.164 ..P WKT 2010 10 10 07 34 55 31.3200 -97.3300 251.000 457.0 109.200 6.060 -999.990 -999.990 1.092 ..P WKT 2010 10 10 07 39 55 31.3200 -97.3300 251.000 30.0 117.406 4.980 -999.990 -999.990 1.174 ..P WKT 2010 10 10 07 44 55 31.3200 -97.3300 251.000 122.0 116.520 4.860 -999.990 -999.990 1.165 ..P WKT 2010 10 10 07 49 55 31.3200 -97.3300 251.000 457.0 110.121 5.090 -999.990 -999.990 1.101 ..P WKT 2010 10 10 07 59 55 31.3200 -97.3300 251.000 30.0 119.528 6.260 -999.990 -999.990 1.195 ..P WKT 2010 10 10 08 04 55 31.3200 -97.3300 251.000 122.0 113.149 5.200 -999.990 -999.990 1.131 ..P WKT 2010 10 10 08 09 55 31.3200 -97.3300 251.000 457.0 102.496 4.960 -999.990 -999.990 1.025 ..P WKT 2010 10 10 08 14 55 31.3200 -97.3300 251.000 30.0 114.308 7.950 -999.990 -999.990 1.143 ..P WKT 2010 10 10 08 19 55 31.3200 -97.3300 251.000 122.0 115.094 4.990 -999.990 -999.990 1.151 ..P WKT 2010 10 10 08 24 55 31.3200 -97.3300 251.000 457.0 104.165 4.930 -999.990 -999.990 1.042 ..P WKT 2010 10 10 08 34 55 31.3200 -97.3300 251.000 30.0 123.204 5.990 -999.990 -999.990 1.232 ..P WKT 2010 10 10 08 39 55 31.3200 -97.3300 251.000 122.0 124.916 5.260 -999.990 -999.990 1.249 ..P WKT 2010 10 10 08 44 55 31.3200 -97.3300 251.000 457.0 110.913 5.000 -999.990 -999.990 1.109 ..P WKT 2010 10 10 08 49 55 31.3200 -97.3300 251.000 30.0 126.274 5.670 -999.990 -999.990 1.263 ..P WKT 2010 10 10 08 54 55 31.3200 -97.3300 251.000 122.0 118.336 4.970 -999.990 -999.990 1.183 ..P WKT 2010 10 10 08 59 55 31.3200 -97.3300 251.000 457.0 113.155 5.160 -999.990 -999.990 1.132 ..P WKT 2010 10 10 09 09 55 31.3200 -97.3300 251.000 30.0 124.203 4.890 -999.990 -999.990 1.242 ..P WKT 2010 10 10 09 14 55 31.3200 -97.3300 251.000 122.0 126.645 4.990 -999.990 -999.990 1.266 ..P WKT 2010 10 10 09 19 55 31.3200 -97.3300 251.000 457.0 111.160 5.290 -999.990 -999.990 1.112 ..P WKT 2010 10 10 09 24 55 31.3200 -97.3300 251.000 30.0 121.876 5.080 -999.990 -999.990 1.219 ..P WKT 2010 10 10 09 29 55 31.3200 -97.3300 251.000 122.0 122.939 4.790 -999.990 -999.990 1.229 ..P WKT 2010 10 10 09 34 55 31.3200 -97.3300 251.000 457.0 113.796 4.830 -999.990 -999.990 1.138 ..P WKT 2010 10 10 09 44 55 31.3200 -97.3300 251.000 30.0 123.271 4.810 -999.990 -999.990 1.233 ..P WKT 2010 10 10 09 49 55 31.3200 -97.3300 251.000 122.0 123.822 5.070 -999.990 -999.990 1.238 ..P WKT 2010 10 10 09 54 55 31.3200 -97.3300 251.000 457.0 117.338 5.430 -999.990 -999.990 1.173 ..P WKT 2010 10 10 09 59 55 31.3200 -97.3300 251.000 30.0 116.372 5.630 -999.990 -999.990 1.164 ..P WKT 2010 10 10 10 04 55 31.3200 -97.3300 251.000 122.0 121.475 5.690 -999.990 -999.990 1.215 ..P WKT 2010 10 10 10 09 55 31.3200 -97.3300 251.000 457.0 112.507 5.200 -999.990 -999.990 1.125 ..P WKT 2010 10 10 10 19 55 31.3200 -97.3300 251.000 30.0 119.896 5.200 -999.990 -999.990 1.199 ..P WKT 2010 10 10 10 24 55 31.3200 -97.3300 251.000 122.0 114.730 5.680 -999.990 -999.990 1.147 ..P WKT 2010 10 10 10 29 55 31.3200 -97.3300 251.000 457.0 107.081 6.130 -999.990 -999.990 1.071 ..P WKT 2010 10 10 10 34 55 31.3200 -97.3300 251.000 30.0 121.233 6.080 -999.990 -999.990 1.212 ..P WKT 2010 10 10 10 39 55 31.3200 -97.3300 251.000 122.0 112.204 5.620 -999.990 -999.990 1.122 ..P WKT 2010 10 10 10 44 55 31.3200 -97.3300 251.000 457.0 104.001 5.600 -999.990 -999.990 1.040 ..P WKT 2010 10 10 10 54 55 31.3200 -97.3300 251.000 30.0 122.333 5.110 -999.990 -999.990 1.223 ..P WKT 2010 10 10 10 59 55 31.3200 -97.3300 251.000 122.0 117.680 5.490 -999.990 -999.990 1.177 ..P WKT 2010 10 10 11 04 55 31.3200 -97.3300 251.000 457.0 101.155 5.930 -999.990 -999.990 1.012 ..P WKT 2010 10 10 11 09 55 31.3200 -97.3300 251.000 30.0 118.585 5.410 -999.990 -999.990 1.186 ..P WKT 2010 10 10 11 14 55 31.3200 -97.3300 251.000 122.0 122.488 5.390 -999.990 -999.990 1.225 ..P WKT 2010 10 10 11 19 55 31.3200 -97.3300 251.000 457.0 109.274 5.880 -999.990 -999.990 1.093 ..P WKT 2010 10 10 11 29 55 31.3200 -97.3300 251.000 30.0 122.961 5.530 -999.990 -999.990 1.230 ..P WKT 2010 10 10 11 34 55 31.3200 -97.3300 251.000 122.0 126.395 5.470 -999.990 -999.990 1.264 ..P WKT 2010 10 10 11 39 55 31.3200 -97.3300 251.000 457.0 111.327 5.660 -999.990 -999.990 1.113 ..P WKT 2010 10 10 11 44 55 31.3200 -97.3300 251.000 30.0 126.083 5.240 -999.990 -999.990 1.261 ..P WKT 2010 10 10 11 49 55 31.3200 -97.3300 251.000 122.0 126.065 5.510 -999.990 -999.990 1.261 ..P WKT 2010 10 10 12 09 55 31.3200 -97.3300 251.000 457.0 100.853 5.040 -999.990 -999.990 1.009 ..P WKT 2010 10 10 12 10 25 31.3200 -97.3300 251.000 457.0 103.875 5.180 -999.990 -999.990 1.039 ..P WKT 2010 10 10 12 10 55 31.3200 -97.3300 251.000 457.0 105.240 5.560 -999.990 -999.990 1.052 ..P WKT 2010 10 10 12 11 25 31.3200 -97.3300 251.000 457.0 105.224 5.280 -999.990 -999.990 1.052 ..P WKT 2010 10 10 12 11 55 31.3200 -97.3300 251.000 457.0 106.587 5.260 -999.990 -999.990 1.066 ..P WKT 2010 10 10 12 12 25 31.3200 -97.3300 251.000 457.0 109.609 5.050 -999.990 -999.990 1.096 ..P WKT 2010 10 10 12 12 55 31.3200 -97.3300 251.000 457.0 105.589 6.120 -999.990 -999.990 1.056 ..P WKT 2010 10 10 12 13 25 31.3200 -97.3300 251.000 457.0 103.503 5.870 -999.990 -999.990 1.035 ..P WKT 2010 10 10 12 13 55 31.3200 -97.3300 251.000 457.0 105.281 5.300 -999.990 -999.990 1.053 ..P WKT 2010 10 10 12 14 25 31.3200 -97.3300 251.000 457.0 108.992 5.230 -999.990 -999.990 1.090 ..P WKT 2010 10 10 12 14 55 31.3200 -97.3300 251.000 457.0 111.874 5.020 -999.990 -999.990 1.119 ..P WKT 2010 10 10 12 19 55 31.3200 -97.3300 251.000 30.0 123.169 5.260 -999.990 -999.990 1.232 ..P WKT 2010 10 10 12 24 55 31.3200 -97.3300 251.000 122.0 121.901 5.600 -999.990 -999.990 1.219 ..P WKT 2010 10 10 12 29 55 31.3200 -97.3300 251.000 457.0 105.732 4.950 -999.990 -999.990 1.057 ..P WKT 2010 10 10 12 34 55 31.3200 -97.3300 251.000 30.0 121.575 4.960 -999.990 -999.990 1.216 ..P WKT 2010 10 10 12 39 55 31.3200 -97.3300 251.000 122.0 118.240 5.010 -999.990 -999.990 1.182 ..P WKT 2010 10 10 12 44 55 31.3200 -97.3300 251.000 457.0 103.594 5.310 -999.990 -999.990 1.036 ..P WKT 2010 10 10 12 54 55 31.3200 -97.3300 251.000 30.0 125.825 5.560 -999.990 -999.990 1.258 ..P WKT 2010 10 10 12 59 55 31.3200 -97.3300 251.000 122.0 111.258 4.970 -999.990 -999.990 1.113 ..P WKT 2010 10 10 13 04 55 31.3200 -97.3300 251.000 457.0 104.002 5.780 -999.990 -999.990 1.040 ..P WKT 2010 10 10 13 09 55 31.3200 -97.3300 251.000 30.0 126.109 6.410 -999.990 -999.990 1.261 ..P WKT 2010 10 10 13 14 55 31.3200 -97.3300 251.000 122.0 102.727 6.140 -999.990 -999.990 1.027 ..P WKT 2010 10 10 13 19 55 31.3200 -97.3300 251.000 457.0 100.987 5.280 -999.990 -999.990 1.010 ..P WKT 2010 10 10 13 29 55 31.3200 -97.3300 251.000 30.0 127.228 5.540 -999.990 -999.990 1.272 ..P WKT 2010 10 10 13 34 55 31.3200 -97.3300 251.000 122.0 97.483 5.880 -999.990 -999.990 0.975 ..P WKT 2010 10 10 13 39 55 31.3200 -97.3300 251.000 457.0 111.407 6.530 -999.990 -999.990 1.114 ..P WKT 2010 10 10 13 44 55 31.3200 -97.3300 251.000 30.0 124.502 7.630 -999.990 -999.990 1.245 ..P WKT 2010 10 10 13 49 55 31.3200 -97.3300 251.000 122.0 112.394 6.760 -999.990 -999.990 1.124 ..P WKT 2010 10 10 13 54 55 31.3200 -97.3300 251.000 457.0 119.426 5.750 -999.990 -999.990 1.194 ..P WKT 2010 10 10 14 04 55 31.3200 -97.3300 251.000 30.0 130.223 6.160 -999.990 -999.990 1.302 ..P WKT 2010 10 10 14 09 55 31.3200 -97.3300 251.000 122.0 122.701 6.760 -999.990 -999.990 1.227 ..P WKT 2010 10 10 14 14 55 31.3200 -97.3300 251.000 457.0 111.604 7.750 -999.990 -999.990 1.116 ..P WKT 2010 10 10 14 19 55 31.3200 -97.3300 251.000 30.0 121.699 6.660 -999.990 -999.990 1.217 ..P WKT 2010 10 10 14 24 55 31.3200 -97.3300 251.000 122.0 112.806 5.830 -999.990 -999.990 1.128 ..P WKT 2010 10 10 14 29 55 31.3200 -97.3300 251.000 457.0 102.539 5.000 -999.990 -999.990 1.025 ..P WKT 2010 10 10 14 39 55 31.3200 -97.3300 251.000 30.0 110.343 5.070 -999.990 -999.990 1.103 ..P WKT 2010 10 10 14 44 55 31.3200 -97.3300 251.000 122.0 118.232 6.650 -999.990 -999.990 1.182 ..P WKT 2010 10 10 14 49 55 31.3200 -97.3300 251.000 457.0 107.970 6.040 -999.990 -999.990 1.080 ..P WKT 2010 10 10 14 54 55 31.3200 -97.3300 251.000 30.0 115.307 5.630 -999.990 -999.990 1.153 ..P WKT 2010 10 10 14 59 55 31.3200 -97.3300 251.000 122.0 116.869 5.500 -999.990 -999.990 1.169 ..P WKT 2010 10 10 15 04 55 31.3200 -97.3300 251.000 457.0 106.611 5.060 -999.990 -999.990 1.066 ..P WKT 2010 10 10 15 14 55 31.3200 -97.3300 251.000 30.0 114.800 5.040 -999.990 -999.990 1.148 ..P WKT 2010 10 10 15 19 55 31.3200 -97.3300 251.000 122.0 112.632 5.060 -999.990 -999.990 1.126 ..P WKT 2010 10 10 15 24 55 31.3200 -97.3300 251.000 457.0 106.344 5.400 -999.990 -999.990 1.063 ..P WKT 2010 10 10 15 29 55 31.3200 -97.3300 251.000 30.0 111.870 4.770 -999.990 -999.990 1.119 ..P WKT 2010 10 10 15 34 55 31.3200 -97.3300 251.000 122.0 119.866 4.820 -999.990 -999.990 1.199 ..P WKT 2010 10 10 15 39 55 31.3200 -97.3300 251.000 457.0 106.165 5.190 -999.990 -999.990 1.062 ..P WKT 2010 10 10 15 49 55 31.3200 -97.3300 251.000 30.0 117.367 5.350 -999.990 -999.990 1.174 ..P WKT 2010 10 10 15 54 55 31.3200 -97.3300 251.000 122.0 118.926 5.020 -999.990 -999.990 1.189 ..P WKT 2010 10 10 15 59 55 31.3200 -97.3300 251.000 457.0 116.368 5.560 -999.990 -999.990 1.164 ..P WKT 2010 10 10 16 04 55 31.3200 -97.3300 251.000 30.0 119.711 5.620 -999.990 -999.990 1.197 ..P WKT 2010 10 10 16 09 55 31.3200 -97.3300 251.000 122.0 114.821 5.680 -999.990 -999.990 1.148 ..P WKT 2010 10 10 16 14 55 31.3200 -97.3300 251.000 457.0 112.539 4.830 -999.990 -999.990 1.125 ..P WKT 2010 10 10 16 24 55 31.3200 -97.3300 251.000 30.0 116.009 4.940 -999.990 -999.990 1.160 ..P WKT 2010 10 10 16 29 55 31.3200 -97.3300 251.000 122.0 113.532 6.750 -999.990 -999.990 1.135 ..P WKT 2010 10 10 16 34 55 31.3200 -97.3300 251.000 457.0 114.347 6.080 -999.990 -999.990 1.143 ..P WKT 2010 10 10 16 39 55 31.3200 -97.3300 251.000 30.0 107.756 5.540 -999.990 -999.990 1.078 ..P WKT 2010 10 10 16 44 55 31.3200 -97.3300 251.000 122.0 109.942 5.680 -999.990 -999.990 1.099 ..P WKT 2010 10 10 16 49 55 31.3200 -97.3300 251.000 457.0 102.258 5.180 -999.990 -999.990 1.023 ..P WKT 2010 10 10 17 04 55 31.3200 -97.3300 251.000 30.0 99.017 5.400 -999.990 -999.990 0.990 ..P WKT 2010 10 10 17 09 55 31.3200 -97.3300 251.000 122.0 102.264 5.520 -999.990 -999.990 1.023 ..P WKT 2010 10 10 17 14 55 31.3200 -97.3300 251.000 457.0 100.989 5.570 -999.990 -999.990 1.010 ..P WKT 2010 10 10 17 19 55 31.3200 -97.3300 251.000 30.0 97.250 5.060 -999.990 -999.990 0.973 ..P WKT 2010 10 10 17 24 55 31.3200 -97.3300 251.000 122.0 105.563 4.880 -999.990 -999.990 1.056 ..P WKT 2010 10 10 17 29 55 31.3200 -97.3300 251.000 457.0 107.849 4.720 -999.990 -999.990 1.078 ..P WKT 2010 10 10 17 39 55 31.3200 -97.3300 251.000 30.0 104.475 6.830 -999.990 -999.990 1.045 ..P WKT 2010 10 10 17 44 55 31.3200 -97.3300 251.000 122.0 109.903 4.660 -999.990 -999.990 1.099 ..P WKT 2010 10 10 17 49 55 31.3200 -97.3300 251.000 457.0 107.803 4.570 -999.990 -999.990 1.078 ..P WKT 2010 10 10 17 54 55 31.3200 -97.3300 251.000 30.0 107.619 4.610 -999.990 -999.990 1.076 ..P WKT 2010 10 10 17 59 55 31.3200 -97.3300 251.000 122.0 111.266 4.440 -999.990 -999.990 1.113 ..P WKT 2010 10 10 18 04 55 31.3200 -97.3300 251.000 457.0 103.968 4.500 -999.990 -999.990 1.040 ..P WKT 2010 10 10 18 14 55 31.3200 -97.3300 251.000 30.0 99.596 5.160 -999.990 -999.990 0.996 ..P WKT 2010 10 10 18 19 55 31.3200 -97.3300 251.000 122.0 107.169 4.640 -999.990 -999.990 1.072 ..P WKT 2010 10 10 18 24 55 31.3200 -97.3300 251.000 457.0 108.451 4.700 -999.990 -999.990 1.085 ..P WKT 2010 10 10 18 29 55 31.3200 -97.3300 251.000 30.0 107.271 5.370 -999.990 -999.990 1.073 ..P WKT 2010 10 10 18 34 55 31.3200 -97.3300 251.000 122.0 103.631 4.540 -999.990 -999.990 1.036 ..P WKT 2010 10 10 18 39 55 31.3200 -97.3300 251.000 457.0 102.453 4.560 -999.990 -999.990 1.025 ..P WKT 2010 10 10 18 49 55 31.3200 -97.3300 251.000 30.0 108.918 6.250 -999.990 -999.990 1.089 ..P WKT 2010 10 10 18 54 55 31.3200 -97.3300 251.000 122.0 112.463 4.970 -999.990 -999.990 1.125 ..P WKT 2010 10 10 18 59 55 31.3200 -97.3300 251.000 457.0 104.531 5.200 -999.990 -999.990 1.045 ..P WKT 2010 10 10 19 04 55 31.3200 -97.3300 251.000 30.0 109.714 4.860 -999.990 -999.990 1.097 ..P WKT 2010 10 10 19 09 55 31.3200 -97.3300 251.000 122.0 109.979 4.480 -999.990 -999.990 1.100 ..P WKT 2010 10 10 19 14 55 31.3200 -97.3300 251.000 457.0 101.504 5.190 -999.990 -999.990 1.015 ..P WKT 2010 10 10 19 24 55 31.3200 -97.3300 251.000 30.0 107.927 4.590 -999.990 -999.990 1.079 ..P WKT 2010 10 10 19 29 55 31.3200 -97.3300 251.000 122.0 113.807 5.190 -999.990 -999.990 1.138 ..P WKT 2010 10 10 19 34 55 31.3200 -97.3300 251.000 457.0 114.227 5.940 -999.990 -999.990 1.142 ..P WKT 2010 10 10 19 39 55 31.3200 -97.3300 251.000 30.0 110.008 4.900 -999.990 -999.990 1.100 ..P WKT 2010 10 10 19 44 55 31.3200 -97.3300 251.000 122.0 105.107 5.280 -999.990 -999.990 1.051 ..P WKT 2010 10 10 19 49 55 31.3200 -97.3300 251.000 457.0 114.260 5.600 -999.990 -999.990 1.143 ..P WKT 2010 10 10 19 59 55 31.3200 -97.3300 251.000 30.0 104.539 5.120 -999.990 -999.990 1.045 ..P WKT 2010 10 10 20 04 55 31.3200 -97.3300 251.000 122.0 110.084 4.940 -999.990 -999.990 1.101 ..P WKT 2010 10 10 20 09 55 31.3200 -97.3300 251.000 457.0 105.810 5.180 -999.990 -999.990 1.058 ..P WKT 2010 10 10 20 14 55 31.3200 -97.3300 251.000 30.0 114.898 5.750 -999.990 -999.990 1.149 ..P WKT 2010 10 10 20 19 55 31.3200 -97.3300 251.000 122.0 110.624 6.180 -999.990 -999.990 1.106 ..P WKT 2010 10 10 20 24 55 31.3200 -97.3300 251.000 457.0 107.851 4.860 -999.990 -999.990 1.079 ..P WKT 2010 10 10 20 34 55 31.3200 -97.3300 251.000 30.0 109.218 4.600 -999.990 -999.990 1.092 ..P WKT 2010 10 10 20 39 55 31.3200 -97.3300 251.000 122.0 114.309 4.880 -999.990 -999.990 1.143 ..P WKT 2010 10 10 20 44 55 31.3200 -97.3300 251.000 457.0 101.008 4.910 -999.990 -999.990 1.010 ..P WKT 2010 10 10 20 49 55 31.3200 -97.3300 251.000 30.0 100.242 4.710 -999.990 -999.990 1.002 ..P WKT 2010 10 10 20 54 55 31.3200 -97.3300 251.000 122.0 107.240 4.760 -999.990 -999.990 1.072 ..P WKT 2010 10 10 20 59 55 31.3200 -97.3300 251.000 457.0 105.384 4.410 -999.990 -999.990 1.054 ..P WKT 2010 10 10 21 09 55 31.3200 -97.3300 251.000 30.0 97.160 5.040 -999.990 -999.990 0.972 ..P WKT 2010 10 10 21 14 55 31.3200 -97.3300 251.000 122.0 101.277 4.180 -999.990 -999.990 1.013 ..P WKT 2010 10 10 21 19 55 31.3200 -97.3300 251.000 457.0 101.173 4.230 -999.990 -999.990 1.012 ..P WKT 2010 10 10 21 24 55 31.3200 -97.3300 251.000 30.0 108.418 6.090 -999.990 -999.990 1.084 ..P WKT 2010 10 10 21 29 55 31.3200 -97.3300 251.000 122.0 106.544 4.360 -999.990 -999.990 1.065 ..P WKT 2010 10 10 21 34 55 31.3200 -97.3300 251.000 457.0 105.350 4.640 -999.990 -999.990 1.053 ..P WKT 2010 10 10 21 44 55 31.3200 -97.3300 251.000 30.0 100.439 5.180 -999.990 -999.990 1.004 ..P WKT 2010 10 10 21 49 55 31.3200 -97.3300 251.000 122.0 105.289 4.490 -999.990 -999.990 1.053 ..P WKT 2010 10 10 21 54 55 31.3200 -97.3300 251.000 457.0 103.611 4.740 -999.990 -999.990 1.036 ..P WKT 2010 10 10 21 59 55 31.3200 -97.3300 251.000 30.0 98.942 5.190 -999.990 -999.990 0.989 ..P WKT 2010 10 10 22 04 55 31.3200 -97.3300 251.000 122.0 99.712 5.440 -999.990 -999.990 0.997 ..P WKT 2010 10 10 22 09 55 31.3200 -97.3300 251.000 457.0 95.588 4.730 -999.990 -999.990 0.956 ..P WKT 2010 10 10 22 19 55 31.3200 -97.3300 251.000 30.0 100.235 4.780 -999.990 -999.990 1.002 ..P WKT 2010 10 10 22 24 55 31.3200 -97.3300 251.000 122.0 107.100 5.060 -999.990 -999.990 1.071 ..P WKT 2010 10 10 22 29 55 31.3200 -97.3300 251.000 457.0 99.018 5.070 -999.990 -999.990 0.990 ..P WKT 2010 10 10 22 34 55 31.3200 -97.3300 251.000 30.0 102.350 4.730 -999.990 -999.990 1.023 ..P WKT 2010 10 10 22 39 55 31.3200 -97.3300 251.000 122.0 103.779 4.710 -999.990 -999.990 1.038 ..P WKT 2010 10 10 22 44 55 31.3200 -97.3300 251.000 457.0 103.034 4.810 -999.990 -999.990 1.030 ..P WKT 2010 10 10 22 54 55 31.3200 -97.3300 251.000 30.0 99.334 4.940 -999.990 -999.990 0.993 ..P WKT 2010 10 10 22 59 55 31.3200 -97.3300 251.000 122.0 105.611 4.490 -999.990 -999.990 1.056 ..P WKT 2010 10 10 23 04 55 31.3200 -97.3300 251.000 457.0 100.756 4.670 -999.990 -999.990 1.008 ..P WKT 2010 10 10 23 09 55 31.3200 -97.3300 251.000 30.0 96.444 4.570 -999.990 -999.990 0.964 ..P WKT 2010 10 10 23 14 55 31.3200 -97.3300 251.000 122.0 102.720 4.780 -999.990 -999.990 1.027 ..P WKT 2010 10 10 23 19 55 31.3200 -97.3300 251.000 457.0 105.465 4.260 -999.990 -999.990 1.055 ..P WKT 2010 10 10 23 29 55 31.3200 -97.3300 251.000 30.0 99.791 4.260 -999.990 -999.990 0.998 ..P WKT 2010 10 10 23 34 55 31.3200 -97.3300 251.000 122.0 104.938 4.520 -999.990 -999.990 1.049 ..P WKT 2010 10 10 23 39 55 31.3200 -97.3300 251.000 457.0 104.795 4.490 -999.990 -999.990 1.048 ..P WKT 2010 10 10 23 44 55 31.3200 -97.3300 251.000 30.0 109.534 4.370 -999.990 -999.990 1.095 ..P WKT 2010 10 10 23 49 55 31.3200 -97.3300 251.000 122.0 113.458 5.700 -999.990 -999.990 1.135 ..P WKT 2010 10 11 00 09 55 31.3200 -97.3300 251.000 457.0 98.446 4.430 -999.990 -999.990 0.984 ..P WKT 2010 10 11 00 10 25 31.3200 -97.3300 251.000 457.0 102.586 5.270 -999.990 -999.990 1.026 ..P WKT 2010 10 11 00 10 55 31.3200 -97.3300 251.000 457.0 100.626 4.550 -999.990 -999.990 1.006 ..P WKT 2010 10 11 00 11 25 31.3200 -97.3300 251.000 457.0 101.647 4.380 -999.990 -999.990 1.016 ..P WKT 2010 10 11 00 11 55 31.3200 -97.3300 251.000 457.0 96.975 4.730 -999.990 -999.990 0.970 ..P WKT 2010 10 11 00 12 25 31.3200 -97.3300 251.000 457.0 102.335 6.580 -999.990 -999.990 1.023 ..P WKT 2010 10 11 00 12 55 31.3200 -97.3300 251.000 457.0 104.713 5.650 -999.990 -999.990 1.047 ..P WKT 2010 10 11 00 13 25 31.3200 -97.3300 251.000 457.0 97.735 4.400 -999.990 -999.990 0.977 ..P WKT 2010 10 11 00 13 55 31.3200 -97.3300 251.000 457.0 98.622 4.640 -999.990 -999.990 0.986 ..P WKT 2010 10 11 00 14 25 31.3200 -97.3300 251.000 457.0 97.203 4.440 -999.990 -999.990 0.972 ..P WKT 2010 10 11 00 14 55 31.3200 -97.3300 251.000 457.0 97.547 4.380 -999.990 -999.990 0.975 ..P WKT 2010 10 11 00 19 55 31.3200 -97.3300 251.000 30.0 101.801 4.450 -999.990 -999.990 1.018 ..P WKT 2010 10 11 00 24 55 31.3200 -97.3300 251.000 122.0 104.564 4.920 -999.990 -999.990 1.046 ..P WKT 2010 10 11 00 29 55 31.3200 -97.3300 251.000 457.0 97.154 4.830 -999.990 -999.990 0.972 ..P WKT 2010 10 11 00 34 55 31.3200 -97.3300 251.000 30.0 107.243 4.620 -999.990 -999.990 1.072 ..P WKT 2010 10 11 00 39 55 31.3200 -97.3300 251.000 122.0 95.490 5.480 -999.990 -999.990 0.955 ..P WKT 2010 10 11 00 44 55 31.3200 -97.3300 251.000 457.0 93.640 4.540 -999.990 -999.990 0.936 ..P WKT 2010 10 11 00 54 55 31.3200 -97.3300 251.000 30.0 106.995 4.640 -999.990 -999.990 1.070 ..P WKT 2010 10 11 00 59 55 31.3200 -97.3300 251.000 122.0 96.005 4.800 -999.990 -999.990 0.960 ..P WKT 2010 10 11 01 04 55 31.3200 -97.3300 251.000 457.0 94.516 4.630 -999.990 -999.990 0.945 ..P WKT 2010 10 11 01 09 55 31.3200 -97.3300 251.000 30.0 103.346 5.170 -999.990 -999.990 1.033 ..P WKT 2010 10 11 01 14 55 31.3200 -97.3300 251.000 122.0 99.006 4.710 -999.990 -999.990 0.990 ..P WKT 2010 10 11 01 19 55 31.3200 -97.3300 251.000 457.0 97.381 4.870 -999.990 -999.990 0.974 ..P WKT 2010 10 11 01 29 55 31.3200 -97.3300 251.000 30.0 106.725 4.850 -999.990 -999.990 1.067 ..P WKT 2010 10 11 01 34 55 31.3200 -97.3300 251.000 122.0 101.665 4.830 -999.990 -999.990 1.017 ..P WKT 2010 10 11 01 39 55 31.3200 -97.3300 251.000 457.0 99.458 5.150 -999.990 -999.990 0.995 ..P WKT 2010 10 11 01 44 55 31.3200 -97.3300 251.000 30.0 100.103 4.480 -999.990 -999.990 1.001 ..P WKT 2010 10 11 01 49 55 31.3200 -97.3300 251.000 122.0 98.030 4.420 -999.990 -999.990 0.980 ..P WKT 2010 10 11 01 54 55 31.3200 -97.3300 251.000 457.0 100.579 4.340 -999.990 -999.990 1.006 ..P WKT 2010 10 11 02 04 55 31.3200 -97.3300 251.000 30.0 103.327 4.520 -999.990 -999.990 1.033 ..P WKT 2010 10 11 02 09 55 31.3200 -97.3300 251.000 122.0 104.886 5.030 -999.990 -999.990 1.049 ..P WKT 2010 10 11 02 14 55 31.3200 -97.3300 251.000 457.0 104.270 4.780 -999.990 -999.990 1.043 ..P WKT 2010 10 11 02 19 55 31.3200 -97.3300 251.000 30.0 99.030 4.650 -999.990 -999.990 0.990 ..P WKT 2010 10 11 02 24 55 31.3200 -97.3300 251.000 122.0 98.141 4.230 -999.990 -999.990 0.981 ..P WKT 2010 10 11 02 29 55 31.3200 -97.3300 251.000 457.0 100.244 5.260 -999.990 -999.990 1.002 ..P WKT 2010 10 11 02 39 55 31.3200 -97.3300 251.000 30.0 104.958 4.610 -999.990 -999.990 1.050 ..P WKT 2010 10 11 02 44 55 31.3200 -97.3300 251.000 122.0 103.486 4.180 -999.990 -999.990 1.035 ..P WKT 2010 10 11 02 49 55 31.3200 -97.3300 251.000 457.0 108.819 4.330 -999.990 -999.990 1.088 ..P WKT 2010 10 11 02 54 55 31.3200 -97.3300 251.000 30.0 106.803 4.490 -999.990 -999.990 1.068 ..P WKT 2010 10 11 02 59 55 31.3200 -97.3300 251.000 122.0 105.875 4.590 -999.990 -999.990 1.059 ..P WKT 2010 10 11 03 04 55 31.3200 -97.3300 251.000 457.0 104.403 4.430 -999.990 -999.990 1.044 ..P WKT 2010 10 11 03 14 55 31.3200 -97.3300 251.000 30.0 103.460 4.440 -999.990 -999.990 1.035 ..P WKT 2010 10 11 03 19 55 31.3200 -97.3300 251.000 122.0 99.905 5.350 -999.990 -999.990 0.999 ..P WKT 2010 10 11 03 24 55 31.3200 -97.3300 251.000 457.0 99.074 5.330 -999.990 -999.990 0.991 ..P WKT 2010 10 11 03 29 55 31.3200 -97.3300 251.000 30.0 111.046 5.190 -999.990 -999.990 1.110 ..P WKT 2010 10 11 03 34 55 31.3200 -97.3300 251.000 122.0 107.900 5.090 -999.990 -999.990 1.079 ..P WKT 2010 10 11 03 39 55 31.3200 -97.3300 251.000 457.0 99.711 4.900 -999.990 -999.990 0.997 ..P WKT 2010 10 11 03 49 55 31.3200 -97.3300 251.000 30.0 111.052 5.300 -999.990 -999.990 1.111 ..P WKT 2010 10 11 03 54 55 31.3200 -97.3300 251.000 122.0 111.506 4.840 -999.990 -999.990 1.115 ..P WKT 2010 10 11 03 59 55 31.3200 -97.3300 251.000 457.0 105.008 5.470 -999.990 -999.990 1.050 ..P WKT 2010 10 11 04 04 55 31.3200 -97.3300 251.000 30.0 108.870 5.450 -999.990 -999.990 1.089 ..P WKT 2010 10 11 04 09 55 31.3200 -97.3300 251.000 122.0 108.097 5.580 -999.990 -999.990 1.081 ..P WKT 2010 10 11 04 14 55 31.3200 -97.3300 251.000 457.0 101.187 5.780 -999.990 -999.990 1.012 ..P WKT 2010 10 11 04 24 55 31.3200 -97.3300 251.000 30.0 109.693 5.280 -999.990 -999.990 1.097 ..P WKT 2010 10 11 04 29 55 31.3200 -97.3300 251.000 122.0 106.425 5.730 -999.990 -999.990 1.064 ..P WKT 2010 10 11 04 34 55 31.3200 -97.3300 251.000 457.0 107.249 5.300 -999.990 -999.990 1.072 ..P WKT 2010 10 11 04 39 55 31.3200 -97.3300 251.000 30.0 106.300 5.570 -999.990 -999.990 1.063 ..P WKT 2010 10 11 04 44 55 31.3200 -97.3300 251.000 122.0 110.672 5.510 -999.990 -999.990 1.107 ..P WKT 2010 10 11 04 49 55 31.3200 -97.3300 251.000 457.0 100.853 5.950 -999.990 -999.990 1.009 ..P WKT 2010 10 11 05 04 55 31.3200 -97.3300 251.000 30.0 98.854 5.020 -999.990 -999.990 0.989 ..P WKT 2010 10 11 05 09 55 31.3200 -97.3300 251.000 122.0 93.552 5.180 -999.990 -999.990 0.936 ..P WKT 2010 10 11 05 14 55 31.3200 -97.3300 251.000 457.0 98.625 6.690 -999.990 -999.990 0.986 ..P WKT 2010 10 11 05 19 55 31.3200 -97.3300 251.000 30.0 99.740 6.380 -999.990 -999.990 0.997 ..P WKT 2010 10 11 05 24 55 31.3200 -97.3300 251.000 122.0 101.537 6.220 -999.990 -999.990 1.015 ..P WKT 2010 10 11 05 29 55 31.3200 -97.3300 251.000 457.0 92.954 5.310 -999.990 -999.990 0.930 ..P WKT 2010 10 11 05 39 55 31.3200 -97.3300 251.000 30.0 96.610 5.280 -999.990 -999.990 0.966 ..P WKT 2010 10 11 05 44 55 31.3200 -97.3300 251.000 122.0 109.810 6.140 -999.990 -999.990 1.098 ..P WKT 2010 10 11 05 49 55 31.3200 -97.3300 251.000 457.0 103.608 6.680 -999.990 -999.990 1.036 ..P WKT 2010 10 11 05 54 55 31.3200 -97.3300 251.000 30.0 110.799 6.000 -999.990 -999.990 1.108 ..P WKT 2010 10 11 05 59 55 31.3200 -97.3300 251.000 122.0 108.696 6.480 -999.990 -999.990 1.087 ..P WKT 2010 10 11 06 04 55 31.3200 -97.3300 251.000 457.0 107.686 6.110 -999.990 -999.990 1.077 ..P WKT 2010 10 11 06 14 55 31.3200 -97.3300 251.000 30.0 110.667 6.260 -999.990 -999.990 1.107 ..P WKT 2010 10 11 06 19 55 31.3200 -97.3300 251.000 122.0 113.018 5.570 -999.990 -999.990 1.130 ..P WKT 2010 10 11 06 24 55 31.3200 -97.3300 251.000 457.0 103.880 6.130 -999.990 -999.990 1.039 ..P WKT 2010 10 11 06 29 55 31.3200 -97.3300 251.000 30.0 108.967 5.280 -999.990 -999.990 1.090 ..P WKT 2010 10 11 06 34 55 31.3200 -97.3300 251.000 122.0 113.233 5.190 -999.990 -999.990 1.132 ..P WKT 2010 10 11 06 39 55 31.3200 -97.3300 251.000 457.0 101.082 4.740 -999.990 -999.990 1.011 ..P WKT 2010 10 11 06 49 55 31.3200 -97.3300 251.000 30.0 107.192 4.640 -999.990 -999.990 1.072 ..P WKT 2010 10 11 06 54 55 31.3200 -97.3300 251.000 122.0 109.857 4.610 -999.990 -999.990 1.099 ..P WKT 2010 10 11 06 59 55 31.3200 -97.3300 251.000 457.0 96.370 4.810 -999.990 -999.990 0.964 ..P WKT 2010 10 11 07 04 55 31.3200 -97.3300 251.000 30.0 105.332 4.760 -999.990 -999.990 1.053 ..P WKT 2010 10 11 07 09 55 31.3200 -97.3300 251.000 122.0 109.914 5.740 -999.990 -999.990 1.099 ..P WKT 2010 10 11 07 14 55 31.3200 -97.3300 251.000 457.0 93.136 4.800 -999.990 -999.990 0.931 ..P WKT 2010 10 11 07 24 55 31.3200 -97.3300 251.000 30.0 113.651 5.720 -999.990 -999.990 1.137 ..P WKT 2010 10 11 07 29 55 31.3200 -97.3300 251.000 122.0 107.669 5.700 -999.990 -999.990 1.077 ..P WKT 2010 10 11 07 34 55 31.3200 -97.3300 251.000 457.0 98.536 5.030 -999.990 -999.990 0.985 ..P WKT 2010 10 11 07 39 55 31.3200 -97.3300 251.000 30.0 111.048 5.200 -999.990 -999.990 1.110 ..P WKT 2010 10 11 07 44 55 31.3200 -97.3300 251.000 122.0 109.586 4.870 -999.990 -999.990 1.096 ..P WKT 2010 10 11 07 49 55 31.3200 -97.3300 251.000 457.0 94.419 5.460 -999.990 -999.990 0.944 ..P WKT 2010 10 11 07 59 55 31.3200 -97.3300 251.000 30.0 109.447 6.030 -999.990 -999.990 1.094 ..P WKT 2010 10 11 08 04 55 31.3200 -97.3300 251.000 122.0 103.049 5.000 -999.990 -999.990 1.030 ..P WKT 2010 10 11 08 09 55 31.3200 -97.3300 251.000 457.0 95.416 5.640 -999.990 -999.990 0.954 ..P WKT 2010 10 11 08 14 55 31.3200 -97.3300 251.000 30.0 100.533 5.240 -999.990 -999.990 1.005 ..P WKT 2010 10 11 08 19 55 31.3200 -97.3300 251.000 122.0 103.183 5.560 -999.990 -999.990 1.032 ..P WKT 2010 10 11 08 24 55 31.3200 -97.3300 251.000 457.0 99.799 5.270 -999.990 -999.990 0.998 ..P WKT 2010 10 11 08 34 55 31.3200 -97.3300 251.000 30.0 105.277 5.950 -999.990 -999.990 1.053 ..P WKT 2010 10 11 08 39 55 31.3200 -97.3300 251.000 122.0 111.123 6.010 -999.990 -999.990 1.111 ..P WKT 2010 10 11 08 44 55 31.3200 -97.3300 251.000 457.0 95.840 5.400 -999.990 -999.990 0.958 ..P WKT 2010 10 11 08 49 55 31.3200 -97.3300 251.000 30.0 104.568 6.190 -999.990 -999.990 1.046 ..P WKT 2010 10 11 08 54 55 31.3200 -97.3300 251.000 122.0 116.181 5.710 -999.990 -999.990 1.162 ..P WKT 2010 10 11 08 59 55 31.3200 -97.3300 251.000 457.0 97.049 5.110 -999.990 -999.990 0.970 ..P WKT 2010 10 11 09 09 55 31.3200 -97.3300 251.000 30.0 112.475 5.520 -999.990 -999.990 1.125 ..P WKT 2010 10 11 09 14 55 31.3200 -97.3300 251.000 122.0 108.735 5.600 -999.990 -999.990 1.087 ..P WKT 2010 10 11 09 19 55 31.3200 -97.3300 251.000 457.0 100.874 6.430 -999.990 -999.990 1.009 ..P WKT 2010 10 11 09 24 55 31.3200 -97.3300 251.000 30.0 109.218 5.510 -999.990 -999.990 1.092 ..P WKT 2010 10 11 09 29 55 31.3200 -97.3300 251.000 122.0 115.229 5.390 -999.990 -999.990 1.152 ..P WKT 2010 10 11 09 34 55 31.3200 -97.3300 251.000 457.0 101.184 5.040 -999.990 -999.990 1.012 ..P WKT 2010 10 11 09 44 55 31.3200 -97.3300 251.000 30.0 105.434 5.680 -999.990 -999.990 1.054 ..P WKT 2010 10 11 09 49 55 31.3200 -97.3300 251.000 122.0 111.644 5.330 -999.990 -999.990 1.116 ..P WKT 2010 10 11 09 54 55 31.3200 -97.3300 251.000 457.0 113.731 5.830 -999.990 -999.990 1.137 ..P WKT 2010 10 11 09 59 55 31.3200 -97.3300 251.000 30.0 104.548 5.470 -999.990 -999.990 1.045 ..P WKT 2010 10 11 10 04 55 31.3200 -97.3300 251.000 122.0 113.509 5.300 -999.990 -999.990 1.135 ..P WKT 2010 10 11 10 09 55 31.3200 -97.3300 251.000 457.0 116.148 4.920 -999.990 -999.990 1.161 ..P WKT 2010 10 11 10 19 55 31.3200 -97.3300 251.000 30.0 104.806 5.200 -999.990 -999.990 1.048 ..P WKT 2010 10 11 10 24 55 31.3200 -97.3300 251.000 122.0 114.203 5.410 -999.990 -999.990 1.142 ..P WKT 2010 10 11 10 29 55 31.3200 -97.3300 251.000 457.0 102.145 5.790 -999.990 -999.990 1.021 ..P WKT 2010 10 11 10 34 55 31.3200 -97.3300 251.000 30.0 108.517 5.190 -999.990 -999.990 1.085 ..P WKT 2010 10 11 10 39 55 31.3200 -97.3300 251.000 122.0 107.462 4.870 -999.990 -999.990 1.075 ..P WKT 2010 10 11 10 44 55 31.3200 -97.3300 251.000 457.0 109.709 4.910 -999.990 -999.990 1.097 ..P WKT 2010 10 11 10 54 55 31.3200 -97.3300 251.000 30.0 106.949 5.730 -999.990 -999.990 1.069 ..P WKT 2010 10 11 10 59 55 31.3200 -97.3300 251.000 122.0 105.795 5.140 -999.990 -999.990 1.058 ..P WKT 2010 10 11 11 04 55 31.3200 -97.3300 251.000 457.0 87.844 5.650 -999.990 -999.990 0.878 ..P WKT 2010 10 11 11 09 55 31.3200 -97.3300 251.000 30.0 106.790 6.380 -999.990 -999.990 1.068 ..P WKT 2010 10 11 11 14 55 31.3200 -97.3300 251.000 122.0 107.287 6.150 -999.990 -999.990 1.073 ..P WKT 2010 10 11 11 19 55 31.3200 -97.3300 251.000 457.0 80.793 5.250 -999.990 -999.990 0.808 ..P WKT 2010 10 11 11 29 55 31.3200 -97.3300 251.000 30.0 107.445 5.790 -999.990 -999.990 1.074 ..P WKT 2010 10 11 11 34 55 31.3200 -97.3300 251.000 122.0 115.562 5.890 -999.990 -999.990 1.156 ..P WKT 2010 10 11 11 39 55 31.3200 -97.3300 251.000 457.0 91.853 6.230 -999.990 -999.990 0.919 ..P WKT 2010 10 11 11 44 55 31.3200 -97.3300 251.000 30.0 107.686 6.330 -999.990 -999.990 1.077 ..P WKT 2010 10 11 11 49 55 31.3200 -97.3300 251.000 122.0 109.466 6.430 -999.990 -999.990 1.095 ..P WKT 2010 10 11 12 09 55 31.3200 -97.3300 251.000 457.0 91.758 6.780 -999.990 -999.990 0.918 ..P WKT 2010 10 11 12 10 25 31.3200 -97.3300 251.000 457.0 93.770 7.070 -999.990 -999.990 0.938 ..P WKT 2010 10 11 12 10 55 31.3200 -97.3300 251.000 457.0 98.538 6.780 -999.990 -999.990 0.985 ..P WKT 2010 10 11 12 11 25 31.3200 -97.3300 251.000 457.0 92.417 7.430 -999.990 -999.990 0.924 ..P WKT 2010 10 11 12 11 55 31.3200 -97.3300 251.000 457.0 93.464 6.920 -999.990 -999.990 0.935 ..P WKT 2010 10 11 12 12 25 31.3200 -97.3300 251.000 457.0 91.892 7.040 -999.990 -999.990 0.919 ..P WKT 2010 10 11 12 12 55 31.3200 -97.3300 251.000 457.0 92.525 7.310 -999.990 -999.990 0.925 ..P WKT 2010 10 11 12 13 25 31.3200 -97.3300 251.000 457.0 96.604 6.940 -999.990 -999.990 0.966 ..P WKT 2010 10 11 12 13 55 31.3200 -97.3300 251.000 457.0 95.859 6.760 -999.990 -999.990 0.959 ..P WKT 2010 10 11 12 14 25 31.3200 -97.3300 251.000 457.0 99.662 6.640 -999.990 -999.990 0.997 ..P WKT 2010 10 11 12 14 55 31.3200 -97.3300 251.000 457.0 98.228 6.750 -999.990 -999.990 0.982 ..P WKT 2010 10 11 12 19 55 31.3200 -97.3300 251.000 30.0 109.523 6.770 -999.990 -999.990 1.095 ..P WKT 2010 10 11 12 24 55 31.3200 -97.3300 251.000 122.0 111.445 6.520 -999.990 -999.990 1.114 ..P WKT 2010 10 11 12 29 55 31.3200 -97.3300 251.000 457.0 99.443 5.920 -999.990 -999.990 0.994 ..P WKT 2010 10 11 12 34 55 31.3200 -97.3300 251.000 30.0 111.704 6.330 -999.990 -999.990 1.117 ..P WKT 2010 10 11 12 39 55 31.3200 -97.3300 251.000 122.0 113.487 6.280 -999.990 -999.990 1.135 ..P WKT 2010 10 11 12 44 55 31.3200 -97.3300 251.000 457.0 90.179 6.170 -999.990 -999.990 0.902 ..P WKT 2010 10 11 12 54 55 31.3200 -97.3300 251.000 30.0 120.395 5.540 -999.990 -999.990 1.204 ..P WKT 2010 10 11 12 59 55 31.3200 -97.3300 251.000 122.0 112.843 5.890 -999.990 -999.990 1.128 ..P WKT 2010 10 11 13 04 55 31.3200 -97.3300 251.000 457.0 99.224 5.980 -999.990 -999.990 0.992 ..P WKT 2010 10 11 13 09 55 31.3200 -97.3300 251.000 30.0 115.938 5.490 -999.990 -999.990 1.159 ..P WKT 2010 10 11 13 14 55 31.3200 -97.3300 251.000 122.0 111.833 5.560 -999.990 -999.990 1.118 ..P WKT 2010 10 11 13 19 55 31.3200 -97.3300 251.000 457.0 98.350 5.440 -999.990 -999.990 0.983 ..P WKT 2010 10 11 13 29 55 31.3200 -97.3300 251.000 30.0 118.584 5.820 -999.990 -999.990 1.186 ..P WKT 2010 10 11 13 34 55 31.3200 -97.3300 251.000 122.0 116.172 5.590 -999.990 -999.990 1.162 ..P WKT 2010 10 11 13 39 55 31.3200 -97.3300 251.000 457.0 102.452 5.450 -999.990 -999.990 1.025 ..P WKT 2010 10 11 13 44 55 31.3200 -97.3300 251.000 30.0 114.933 5.500 -999.990 -999.990 1.149 ..P WKT 2010 10 11 13 49 55 31.3200 -97.3300 251.000 122.0 118.865 5.610 -999.990 -999.990 1.189 ..P WKT 2010 10 11 13 54 55 31.3200 -97.3300 251.000 457.0 97.698 5.700 -999.990 -999.990 0.977 ..P WKT 2010 10 11 14 04 55 31.3200 -97.3300 251.000 30.0 114.742 6.940 -999.990 -999.990 1.147 ..P WKT 2010 10 11 14 09 55 31.3200 -97.3300 251.000 122.0 117.925 5.550 -999.990 -999.990 1.179 ..P WKT 2010 10 11 14 14 55 31.3200 -97.3300 251.000 457.0 104.559 5.640 -999.990 -999.990 1.046 ..P WKT 2010 10 11 14 19 55 31.3200 -97.3300 251.000 30.0 119.051 6.650 -999.990 -999.990 1.191 ..P WKT 2010 10 11 14 24 55 31.3200 -97.3300 251.000 122.0 120.855 6.160 -999.990 -999.990 1.209 ..P WKT 2010 10 11 14 29 55 31.3200 -97.3300 251.000 457.0 110.523 5.700 -999.990 -999.990 1.105 ..P WKT 2010 10 11 14 39 55 31.3200 -97.3300 251.000 30.0 126.978 5.910 -999.990 -999.990 1.270 ..P WKT 2010 10 11 14 44 55 31.3200 -97.3300 251.000 122.0 130.043 5.730 -999.990 -999.990 1.300 ..P WKT 2010 10 11 14 49 55 31.3200 -97.3300 251.000 457.0 111.040 6.510 -999.990 -999.990 1.110 ..P WKT 2010 10 11 14 54 55 31.3200 -97.3300 251.000 30.0 124.312 6.000 -999.990 -999.990 1.243 ..P WKT 2010 10 11 14 59 55 31.3200 -97.3300 251.000 122.0 132.069 6.020 -999.990 -999.990 1.321 ..P WKT 2010 10 11 15 04 55 31.3200 -97.3300 251.000 457.0 111.960 5.890 -999.990 -999.990 1.120 ..P WKT 2010 10 11 15 14 55 31.3200 -97.3300 251.000 30.0 115.136 6.800 -999.990 -999.990 1.151 ..P WKT 2010 10 11 15 19 55 31.3200 -97.3300 251.000 122.0 114.417 5.990 -999.990 -999.990 1.144 ..P WKT 2010 10 11 15 24 55 31.3200 -97.3300 251.000 457.0 111.769 5.850 -999.990 -999.990 1.118 ..P WKT 2010 10 11 15 29 55 31.3200 -97.3300 251.000 30.0 113.258 6.850 -999.990 -999.990 1.133 ..P WKT 2010 10 11 15 34 55 31.3200 -97.3300 251.000 122.0 117.782 5.740 -999.990 -999.990 1.178 ..P WKT 2010 10 11 15 39 55 31.3200 -97.3300 251.000 457.0 107.683 5.620 -999.990 -999.990 1.077 ..P WKT 2010 10 11 15 49 55 31.3200 -97.3300 251.000 30.0 113.145 6.100 -999.990 -999.990 1.131 ..P WKT 2010 10 11 15 54 55 31.3200 -97.3300 251.000 122.0 118.773 5.790 -999.990 -999.990 1.188 ..P WKT 2010 10 11 15 59 55 31.3200 -97.3300 251.000 457.0 119.850 6.540 -999.990 -999.990 1.198 ..P WKT 2010 10 11 16 04 55 31.3200 -97.3300 251.000 30.0 110.715 5.920 -999.990 -999.990 1.107 ..P WKT 2010 10 11 16 09 55 31.3200 -97.3300 251.000 122.0 118.689 5.900 -999.990 -999.990 1.187 ..P WKT 2010 10 11 16 14 55 31.3200 -97.3300 251.000 457.0 114.660 5.780 -999.990 -999.990 1.147 ..P WKT 2010 10 11 16 24 55 31.3200 -97.3300 251.000 30.0 113.894 6.600 -999.990 -999.990 1.139 ..P WKT 2010 10 11 16 29 55 31.3200 -97.3300 251.000 122.0 115.915 5.780 -999.990 -999.990 1.159 ..P WKT 2010 10 11 16 34 55 31.3200 -97.3300 251.000 457.0 109.520 6.180 -999.990 -999.990 1.095 ..P WKT 2010 10 11 16 39 55 31.3200 -97.3300 251.000 30.0 113.750 6.210 -999.990 -999.990 1.137 ..P WKT 2010 10 11 16 44 55 31.3200 -97.3300 251.000 122.0 114.530 6.030 -999.990 -999.990 1.145 ..P WKT 2010 10 11 16 49 55 31.3200 -97.3300 251.000 457.0 110.756 5.940 -999.990 -999.990 1.108 ..P WKT 2010 10 11 17 04 55 31.3200 -97.3300 251.000 30.0 103.825 6.750 -999.990 -999.990 1.038 ..P WKT 2010 10 11 17 09 55 31.3200 -97.3300 251.000 122.0 113.287 6.280 -999.990 -999.990 1.133 ..P WKT 2010 10 11 17 14 55 31.3200 -97.3300 251.000 457.0 102.876 6.410 -999.990 -999.990 1.029 ..P WKT 2010 10 11 17 19 55 31.3200 -97.3300 251.000 30.0 103.230 6.510 -999.990 -999.990 1.032 ..P WKT 2010 10 11 17 24 55 31.3200 -97.3300 251.000 122.0 112.692 6.240 -999.990 -999.990 1.127 ..P WKT 2010 10 11 17 29 55 31.3200 -97.3300 251.000 457.0 112.770 6.300 -999.990 -999.990 1.128 ..P WKT 2010 10 11 17 39 55 31.3200 -97.3300 251.000 30.0 107.200 6.540 -999.990 -999.990 1.072 ..P WKT 2010 10 11 17 44 55 31.3200 -97.3300 251.000 122.0 111.214 6.350 -999.990 -999.990 1.112 ..P WKT 2010 10 11 17 49 55 31.3200 -97.3300 251.000 457.0 110.535 5.950 -999.990 -999.990 1.105 ..P WKT 2010 10 11 17 54 55 31.3200 -97.3300 251.000 30.0 114.273 5.860 -999.990 -999.990 1.143 ..P WKT 2010 10 11 17 59 55 31.3200 -97.3300 251.000 122.0 110.281 6.600 -999.990 -999.990 1.103 ..P WKT 2010 10 11 18 04 55 31.3200 -97.3300 251.000 457.0 105.462 5.790 -999.990 -999.990 1.055 ..P WKT 2010 10 11 18 14 55 31.3200 -97.3300 251.000 30.0 109.309 5.990 -999.990 -999.990 1.093 ..P WKT 2010 10 11 18 19 55 31.3200 -97.3300 251.000 122.0 115.493 6.310 -999.990 -999.990 1.155 ..P WKT 2010 10 11 18 24 55 31.3200 -97.3300 251.000 457.0 114.498 5.950 -999.990 -999.990 1.145 ..P WKT 2010 10 11 18 29 55 31.3200 -97.3300 251.000 30.0 111.572 6.000 -999.990 -999.990 1.116 ..P WKT 2010 10 11 18 34 55 31.3200 -97.3300 251.000 122.0 116.927 6.090 -999.990 -999.990 1.169 ..P WKT 2010 10 11 18 39 55 31.3200 -97.3300 251.000 457.0 112.620 5.920 -999.990 -999.990 1.126 ..P WKT 2010 10 11 18 49 55 31.3200 -97.3300 251.000 30.0 110.769 6.270 -999.990 -999.990 1.108 ..P WKT 2010 10 11 18 54 55 31.3200 -97.3300 251.000 122.0 115.434 6.100 -999.990 -999.990 1.154 ..P WKT 2010 10 11 18 59 55 31.3200 -97.3300 251.000 457.0 107.951 6.080 -999.990 -999.990 1.080 ..P WKT 2010 10 11 19 04 55 31.3200 -97.3300 251.000 30.0 102.952 6.870 -999.990 -999.990 1.030 ..P WKT 2010 10 11 19 09 55 31.3200 -97.3300 251.000 122.0 107.066 6.450 -999.990 -999.990 1.071 ..P WKT 2010 10 11 19 14 55 31.3200 -97.3300 251.000 457.0 102.619 6.220 -999.990 -999.990 1.026 ..P WKT 2010 10 11 19 24 55 31.3200 -97.3300 251.000 30.0 106.961 6.330 -999.990 -999.990 1.070 ..P WKT 2010 10 11 19 29 55 31.3200 -97.3300 251.000 122.0 109.812 6.360 -999.990 -999.990 1.098 ..P WKT 2010 10 11 19 34 55 31.3200 -97.3300 251.000 457.0 107.831 6.140 -999.990 -999.990 1.078 ..P WKT 2010 10 11 19 39 55 31.3200 -97.3300 251.000 30.0 110.407 6.690 -999.990 -999.990 1.104 ..P WKT 2010 10 11 19 44 55 31.3200 -97.3300 251.000 122.0 109.668 6.380 -999.990 -999.990 1.097 ..P WKT 2010 10 11 19 49 55 31.3200 -97.3300 251.000 457.0 110.311 6.680 -999.990 -999.990 1.103 ..P WKT 2010 10 11 19 59 55 31.3200 -97.3300 251.000 30.0 101.752 6.140 -999.990 -999.990 1.018 ..P WKT 2010 10 11 20 04 55 31.3200 -97.3300 251.000 122.0 111.193 7.810 -999.990 -999.990 1.112 ..P WKT 2010 10 11 20 09 55 31.3200 -97.3300 251.000 457.0 111.382 6.950 -999.990 -999.990 1.114 ..P WKT 2010 10 11 20 14 55 31.3200 -97.3300 251.000 30.0 110.604 6.180 -999.990 -999.990 1.106 ..P WKT 2010 10 11 20 19 55 31.3200 -97.3300 251.000 122.0 116.040 6.630 -999.990 -999.990 1.160 ..P WKT 2010 10 11 20 24 55 31.3200 -97.3300 251.000 457.0 109.324 6.200 -999.990 -999.990 1.093 ..P WKT 2010 10 11 20 34 55 31.3200 -97.3300 251.000 30.0 109.859 6.990 -999.990 -999.990 1.099 ..P WKT 2010 10 11 20 39 55 31.3200 -97.3300 251.000 122.0 117.526 6.470 -999.990 -999.990 1.175 ..P WKT 2010 10 11 20 44 55 31.3200 -97.3300 251.000 457.0 116.630 6.280 -999.990 -999.990 1.166 ..P WKT 2010 10 11 20 49 55 31.3200 -97.3300 251.000 30.0 113.385 6.530 -999.990 -999.990 1.134 ..P WKT 2010 10 11 20 54 55 31.3200 -97.3300 251.000 122.0 124.091 6.450 -999.990 -999.990 1.241 ..P WKT 2010 10 11 20 59 55 31.3200 -97.3300 251.000 457.0 112.698 6.300 -999.990 -999.990 1.127 ..P WKT 2010 10 11 21 09 55 31.3200 -97.3300 251.000 30.0 110.569 6.610 -999.990 -999.990 1.106 ..P WKT 2010 10 11 21 14 55 31.3200 -97.3300 251.000 122.0 119.973 6.520 -999.990 -999.990 1.200 ..P WKT 2010 10 11 21 19 55 31.3200 -97.3300 251.000 457.0 105.757 6.420 -999.990 -999.990 1.058 ..P WKT 2010 10 11 21 24 55 31.3200 -97.3300 251.000 30.0 114.747 6.910 -999.990 -999.990 1.147 ..P WKT 2010 10 11 21 29 55 31.3200 -97.3300 251.000 122.0 117.935 6.940 -999.990 -999.990 1.179 ..P WKT 2010 10 11 21 34 55 31.3200 -97.3300 251.000 457.0 119.743 6.280 -999.990 -999.990 1.197 ..P WKT 2010 10 11 21 44 55 31.3200 -97.3300 251.000 30.0 119.607 6.460 -999.990 -999.990 1.196 ..P WKT 2010 10 11 21 49 55 31.3200 -97.3300 251.000 122.0 119.875 6.400 -999.990 -999.990 1.199 ..P WKT 2010 10 11 21 54 55 31.3200 -97.3300 251.000 457.0 113.512 6.330 -999.990 -999.990 1.135 ..P WKT 2010 10 11 21 59 55 31.3200 -97.3300 251.000 30.0 115.161 6.480 -999.990 -999.990 1.152 ..P WKT 2010 10 11 22 04 55 31.3200 -97.3300 251.000 122.0 112.667 7.690 -999.990 -999.990 1.127 ..P WKT 2010 10 11 22 09 55 31.3200 -97.3300 251.000 457.0 115.698 6.450 -999.990 -999.990 1.157 ..P WKT 2010 10 11 22 19 55 31.3200 -97.3300 251.000 30.0 109.996 6.720 -999.990 -999.990 1.100 ..P WKT 2010 10 11 22 24 55 31.3200 -97.3300 251.000 122.0 113.145 6.430 -999.990 -999.990 1.131 ..P WKT 2010 10 11 22 29 55 31.3200 -97.3300 251.000 457.0 116.434 6.810 -999.990 -999.990 1.164 ..P WKT 2010 10 11 22 34 55 31.3200 -97.3300 251.000 30.0 112.261 6.700 -999.990 -999.990 1.123 ..P WKT 2010 10 11 22 39 55 31.3200 -97.3300 251.000 122.0 122.457 6.980 -999.990 -999.990 1.225 ..P WKT 2010 10 11 22 44 55 31.3200 -97.3300 251.000 457.0 117.869 7.040 -999.990 -999.990 1.179 ..P WKT 2010 10 11 22 54 55 31.3200 -97.3300 251.000 30.0 115.523 6.830 -999.990 -999.990 1.155 ..P WKT 2010 10 11 22 59 55 31.3200 -97.3300 251.000 122.0 114.725 6.660 -999.990 -999.990 1.147 ..P WKT 2010 10 11 23 04 55 31.3200 -97.3300 251.000 457.0 109.782 6.940 -999.990 -999.990 1.098 ..P WKT 2010 10 11 23 09 55 31.3200 -97.3300 251.000 30.0 115.202 7.260 -999.990 -999.990 1.152 ..P WKT 2010 10 11 23 14 55 31.3200 -97.3300 251.000 122.0 109.153 6.700 -999.990 -999.990 1.092 ..P WKT 2010 10 11 23 19 55 31.3200 -97.3300 251.000 457.0 111.118 6.910 -999.990 -999.990 1.111 ..P WKT 2010 10 11 23 29 55 31.3200 -97.3300 251.000 30.0 108.757 6.800 -999.990 -999.990 1.088 ..P WKT 2010 10 11 23 34 55 31.3200 -97.3300 251.000 122.0 114.380 6.740 -999.990 -999.990 1.144 ..P WKT 2010 10 11 23 39 55 31.3200 -97.3300 251.000 457.0 115.166 7.300 -999.990 -999.990 1.152 ..P WKT 2010 10 11 23 44 55 31.3200 -97.3300 251.000 30.0 108.351 6.830 -999.990 -999.990 1.084 ..P WKT 2010 10 11 23 49 55 31.3200 -97.3300 251.000 122.0 110.519 7.280 -999.990 -999.990 1.105 ..P WKT 2010 10 12 00 09 55 31.3200 -97.3300 251.000 457.0 105.378 6.700 -999.990 -999.990 1.054 ..P WKT 2010 10 12 00 10 25 31.3200 -97.3300 251.000 457.0 102.594 6.470 -999.990 -999.990 1.026 ..P WKT 2010 10 12 00 10 55 31.3200 -97.3300 251.000 457.0 102.022 6.660 -999.990 -999.990 1.020 ..P WKT 2010 10 12 00 11 25 31.3200 -97.3300 251.000 457.0 104.351 6.850 -999.990 -999.990 1.044 ..P WKT 2010 10 12 00 11 55 31.3200 -97.3300 251.000 457.0 102.120 6.600 -999.990 -999.990 1.021 ..P WKT 2010 10 12 00 12 25 31.3200 -97.3300 251.000 457.0 105.001 6.640 -999.990 -999.990 1.050 ..P WKT 2010 10 12 00 12 55 31.3200 -97.3300 251.000 457.0 103.600 6.570 -999.990 -999.990 1.036 ..P WKT 2010 10 12 00 13 25 31.3200 -97.3300 251.000 457.0 100.955 6.970 -999.990 -999.990 1.010 ..P WKT 2010 10 12 00 13 55 31.3200 -97.3300 251.000 457.0 108.671 6.830 -999.990 -999.990 1.087 ..P WKT 2010 10 12 00 14 25 31.3200 -97.3300 251.000 457.0 110.033 6.740 -999.990 -999.990 1.100 ..P WKT 2010 10 12 00 14 55 31.3200 -97.3300 251.000 457.0 103.520 6.630 -999.990 -999.990 1.035 ..P WKT 2010 10 12 00 19 55 31.3200 -97.3300 251.000 30.0 101.387 7.300 -999.990 -999.990 1.014 ..P WKT 2010 10 12 00 24 55 31.3200 -97.3300 251.000 122.0 98.011 6.770 -999.990 -999.990 0.980 ..P WKT 2010 10 12 00 29 55 31.3200 -97.3300 251.000 457.0 107.755 7.130 -999.990 -999.990 1.078 ..P WKT 2010 10 12 00 34 55 31.3200 -97.3300 251.000 30.0 100.651 6.650 -999.990 -999.990 1.007 ..P WKT 2010 10 12 00 39 55 31.3200 -97.3300 251.000 122.0 105.422 6.780 -999.990 -999.990 1.054 ..P WKT 2010 10 12 00 44 55 31.3200 -97.3300 251.000 457.0 102.186 6.800 -999.990 -999.990 1.022 ..P WKT 2010 10 12 00 54 55 31.3200 -97.3300 251.000 30.0 106.836 7.120 -999.990 -999.990 1.068 ..P WKT 2010 10 12 00 59 55 31.3200 -97.3300 251.000 122.0 109.200 7.660 -999.990 -999.990 1.092 ..P WKT 2010 10 12 01 04 55 31.3200 -97.3300 251.000 457.0 107.978 7.120 -999.990 -999.990 1.080 ..P WKT 2010 10 12 01 09 55 31.3200 -97.3300 251.000 30.0 99.307 7.760 -999.990 -999.990 0.993 ..P WKT 2010 10 12 01 14 55 31.3200 -97.3300 251.000 122.0 104.430 6.770 -999.990 -999.990 1.044 ..P WKT 2010 10 12 01 19 55 31.3200 -97.3300 251.000 457.0 116.722 6.860 -999.990 -999.990 1.167 ..P WKT 2010 10 12 01 29 55 31.3200 -97.3300 251.000 30.0 100.569 7.140 -999.990 -999.990 1.006 ..P WKT 2010 10 12 01 34 55 31.3200 -97.3300 251.000 122.0 109.351 6.590 -999.990 -999.990 1.094 ..P WKT 2010 10 12 01 39 55 31.3200 -97.3300 251.000 457.0 123.919 6.570 -999.990 -999.990 1.239 ..P WKT 2010 10 12 01 44 55 31.3200 -97.3300 251.000 30.0 107.342 6.690 -999.990 -999.990 1.073 ..P WKT 2010 10 12 01 49 55 31.3200 -97.3300 251.000 122.0 111.159 6.470 -999.990 -999.990 1.112 ..P WKT 2010 10 12 01 54 55 31.3200 -97.3300 251.000 457.0 116.904 6.420 -999.990 -999.990 1.169 ..P WKT 2010 10 12 02 04 55 31.3200 -97.3300 251.000 30.0 101.122 6.230 -999.990 -999.990 1.011 ..P WKT 2010 10 12 02 09 55 31.3200 -97.3300 251.000 122.0 101.083 6.400 -999.990 -999.990 1.011 ..P WKT 2010 10 12 02 14 55 31.3200 -97.3300 251.000 457.0 121.694 6.630 -999.990 -999.990 1.217 ..P WKT 2010 10 12 02 19 55 31.3200 -97.3300 251.000 30.0 103.207 6.570 -999.990 -999.990 1.032 ..P WKT 2010 10 12 02 24 55 31.3200 -97.3300 251.000 122.0 113.215 6.480 -999.990 -999.990 1.132 ..P WKT 2010 10 12 02 29 55 31.3200 -97.3300 251.000 457.0 113.724 6.350 -999.990 -999.990 1.137 ..P WKT 2010 10 12 02 39 55 31.3200 -97.3300 251.000 30.0 109.142 6.300 -999.990 -999.990 1.091 ..P WKT 2010 10 12 02 44 55 31.3200 -97.3300 251.000 122.0 112.443 6.440 -999.990 -999.990 1.124 ..P WKT 2010 10 12 02 49 55 31.3200 -97.3300 251.000 457.0 113.267 6.950 -999.990 -999.990 1.133 ..P WKT 2010 10 12 02 54 55 31.3200 -97.3300 251.000 30.0 108.727 6.200 -999.990 -999.990 1.087 ..P WKT 2010 10 12 02 59 55 31.3200 -97.3300 251.000 122.0 118.213 6.200 -999.990 -999.990 1.182 ..P WKT 2010 10 12 03 04 55 31.3200 -97.3300 251.000 457.0 115.050 6.120 -999.990 -999.990 1.151 ..P WKT 2010 10 12 03 14 55 31.3200 -97.3300 251.000 30.0 113.220 6.110 -999.990 -999.990 1.132 ..P WKT 2010 10 12 03 19 55 31.3200 -97.3300 251.000 122.0 118.813 7.100 -999.990 -999.990 1.188 ..P WKT 2010 10 12 03 24 55 31.3200 -97.3300 251.000 457.0 127.291 6.190 -999.990 -999.990 1.273 ..P WKT 2010 10 12 03 29 55 31.3200 -97.3300 251.000 30.0 118.731 6.930 -999.990 -999.990 1.187 ..P WKT 2010 10 12 03 34 55 31.3200 -97.3300 251.000 122.0 121.024 6.390 -999.990 -999.990 1.210 ..P WKT 2010 10 12 03 39 55 31.3200 -97.3300 251.000 457.0 117.687 6.420 -999.990 -999.990 1.177 ..P WKT 2010 10 12 03 49 55 31.3200 -97.3300 251.000 30.0 113.347 6.430 -999.990 -999.990 1.133 ..P WKT 2010 10 12 03 54 55 31.3200 -97.3300 251.000 122.0 121.131 6.470 -999.990 -999.990 1.211 ..P WKT 2010 10 12 03 59 55 31.3200 -97.3300 251.000 457.0 117.383 6.710 -999.990 -999.990 1.174 ..P WKT 2010 10 12 04 04 55 31.3200 -97.3300 251.000 30.0 112.265 6.920 -999.990 -999.990 1.123 ..P WKT 2010 10 12 04 09 55 31.3200 -97.3300 251.000 122.0 118.947 7.380 -999.990 -999.990 1.189 ..P WKT 2010 10 12 04 14 55 31.3200 -97.3300 251.000 457.0 124.532 6.980 -999.990 -999.990 1.245 ..P WKT 2010 10 12 04 24 55 31.3200 -97.3300 251.000 30.0 114.610 7.100 -999.990 -999.990 1.146 ..P WKT 2010 10 12 04 29 55 31.3200 -97.3300 251.000 122.0 121.192 7.450 -999.990 -999.990 1.212 ..P WKT 2010 10 12 04 34 55 31.3200 -97.3300 251.000 457.0 112.687 7.340 -999.990 -999.990 1.127 ..P WKT 2010 10 12 04 39 55 31.3200 -97.3300 251.000 30.0 115.977 6.670 -999.990 -999.990 1.160 ..P WKT 2010 10 12 04 44 55 31.3200 -97.3300 251.000 122.0 122.555 6.580 -999.990 -999.990 1.226 ..P WKT 2010 10 12 04 49 55 31.3200 -97.3300 251.000 457.0 114.603 6.530 -999.990 -999.990 1.146 ..P WKT 2010 10 12 05 04 55 31.3200 -97.3300 251.000 30.0 104.665 6.930 -999.990 -999.990 1.047 ..P WKT 2010 10 12 05 09 55 31.3200 -97.3300 251.000 122.0 114.219 7.370 -999.990 -999.990 1.142 ..P WKT 2010 10 12 05 14 55 31.3200 -97.3300 251.000 457.0 120.484 6.530 -999.990 -999.990 1.205 ..P WKT 2010 10 12 05 19 55 31.3200 -97.3300 251.000 30.0 114.970 6.480 -999.990 -999.990 1.150 ..P WKT 2010 10 12 05 24 55 31.3200 -97.3300 251.000 122.0 109.183 6.960 -999.990 -999.990 1.092 ..P WKT 2010 10 12 05 29 55 31.3200 -97.3300 251.000 457.0 121.469 6.760 -999.990 -999.990 1.215 ..P WKT 2010 10 12 05 39 55 31.3200 -97.3300 251.000 30.0 108.447 6.470 -999.990 -999.990 1.084 ..P WKT 2010 10 12 05 44 55 31.3200 -97.3300 251.000 122.0 119.277 6.380 -999.990 -999.990 1.193 ..P WKT 2010 10 12 05 49 55 31.3200 -97.3300 251.000 457.0 128.187 6.180 -999.990 -999.990 1.282 ..P WKT 2010 10 12 05 54 55 31.3200 -97.3300 251.000 30.0 124.236 5.830 -999.990 -999.990 1.242 ..P WKT 2010 10 12 05 59 55 31.3200 -97.3300 251.000 122.0 109.343 5.550 -999.990 -999.990 1.093 ..P WKT 2010 10 12 06 04 55 31.3200 -97.3300 251.000 457.0 128.920 5.590 -999.990 -999.990 1.289 ..P WKT 2010 10 12 06 14 55 31.3200 -97.3300 251.000 30.0 108.715 5.490 -999.990 -999.990 1.087 ..P WKT 2010 10 12 06 19 55 31.3200 -97.3300 251.000 122.0 112.561 5.380 -999.990 -999.990 1.126 ..P WKT 2010 10 12 06 24 55 31.3200 -97.3300 251.000 457.0 124.472 5.670 -999.990 -999.990 1.245 ..P WKT 2010 10 12 06 29 55 31.3200 -97.3300 251.000 30.0 106.038 6.030 -999.990 -999.990 1.060 ..P WKT 2010 10 12 06 34 55 31.3200 -97.3300 251.000 122.0 111.660 6.600 -999.990 -999.990 1.117 ..P WKT 2010 10 12 06 39 55 31.3200 -97.3300 251.000 457.0 113.864 5.870 -999.990 -999.990 1.139 ..P WKT 2010 10 12 06 49 55 31.3200 -97.3300 251.000 30.0 118.720 5.690 -999.990 -999.990 1.187 ..P WKT 2010 10 12 06 54 55 31.3200 -97.3300 251.000 122.0 111.265 5.880 -999.990 -999.990 1.113 ..P WKT 2010 10 12 06 59 55 31.3200 -97.3300 251.000 457.0 118.832 6.710 -999.990 -999.990 1.188 ..P WKT 2010 10 12 07 04 55 31.3200 -97.3300 251.000 30.0 109.604 5.760 -999.990 -999.990 1.096 ..P WKT 2010 10 12 07 09 55 31.3200 -97.3300 251.000 122.0 113.348 5.550 -999.990 -999.990 1.133 ..P WKT 2010 10 12 07 14 55 31.3200 -97.3300 251.000 457.0 127.464 5.910 -999.990 -999.990 1.275 ..P WKT 2010 10 12 07 24 55 31.3200 -97.3300 251.000 30.0 108.256 6.180 -999.990 -999.990 1.083 ..P WKT 2010 10 12 07 29 55 31.3200 -97.3300 251.000 122.0 112.738 5.650 -999.990 -999.990 1.127 ..P WKT 2010 10 12 07 34 55 31.3200 -97.3300 251.000 457.0 117.219 5.530 -999.990 -999.990 1.172 ..P WKT 2010 10 12 07 39 55 31.3200 -97.3300 251.000 30.0 113.106 5.370 -999.990 -999.990 1.131 ..P WKT 2010 10 12 07 44 55 31.3200 -97.3300 251.000 122.0 115.403 5.420 -999.990 -999.990 1.154 ..P WKT 2010 10 12 07 49 55 31.3200 -97.3300 251.000 457.0 121.109 5.250 -999.990 -999.990 1.211 ..P WKT 2010 10 12 07 59 55 31.3200 -97.3300 251.000 30.0 110.374 5.560 -999.990 -999.990 1.104 ..P WKT 2010 10 12 08 04 55 31.3200 -97.3300 251.000 122.0 116.020 5.720 -999.990 -999.990 1.160 ..P WKT 2010 10 12 08 09 55 31.3200 -97.3300 251.000 457.0 121.664 5.490 -999.990 -999.990 1.217 ..P WKT 2010 10 12 08 14 55 31.3200 -97.3300 251.000 30.0 112.999 5.050 -999.990 -999.990 1.130 ..P WKT 2010 10 12 08 19 55 31.3200 -97.3300 251.000 122.0 116.326 5.150 -999.990 -999.990 1.163 ..P WKT 2010 10 12 08 24 55 31.3200 -97.3300 251.000 457.0 124.556 5.540 -999.990 -999.990 1.246 ..P WKT 2010 10 12 08 34 55 31.3200 -97.3300 251.000 30.0 107.488 5.070 -999.990 -999.990 1.075 ..P WKT 2010 10 12 08 39 55 31.3200 -97.3300 251.000 122.0 112.156 5.060 -999.990 -999.990 1.122 ..P WKT 2010 10 12 08 44 55 31.3200 -97.3300 251.000 457.0 131.254 4.970 -999.990 -999.990 1.313 ..P WKT 2010 10 12 08 49 55 31.3200 -97.3300 251.000 30.0 114.681 5.540 -999.990 -999.990 1.147 ..P WKT 2010 10 12 08 54 55 31.3200 -97.3300 251.000 122.0 115.535 5.750 -999.990 -999.990 1.155 ..P WKT 2010 10 12 08 59 55 31.3200 -97.3300 251.000 457.0 126.459 4.880 -999.990 -999.990 1.265 ..P WKT 2010 10 12 09 09 55 31.3200 -97.3300 251.000 30.0 108.805 5.400 -999.990 -999.990 1.088 ..P WKT 2010 10 12 09 14 55 31.3200 -97.3300 251.000 122.0 110.709 5.770 -999.990 -999.990 1.107 ..P WKT 2010 10 12 09 19 55 31.3200 -97.3300 251.000 457.0 128.661 5.730 -999.990 -999.990 1.287 ..P WKT 2010 10 12 09 24 55 31.3200 -97.3300 251.000 30.0 108.259 5.330 -999.990 -999.990 1.083 ..P WKT 2010 10 12 09 29 55 31.3200 -97.3300 251.000 122.0 114.513 4.990 -999.990 -999.990 1.145 ..P WKT 2010 10 12 09 34 55 31.3200 -97.3300 251.000 457.0 127.019 5.200 -999.990 -999.990 1.270 ..P WKT 2010 10 12 09 44 55 31.3200 -97.3300 251.000 30.0 111.033 4.910 -999.990 -999.990 1.110 ..P WKT 2010 10 12 09 49 55 31.3200 -97.3300 251.000 122.0 126.310 5.010 -999.990 -999.990 1.263 ..P WKT 2010 10 12 09 54 55 31.3200 -97.3300 251.000 457.0 136.147 5.540 -999.990 -999.990 1.361 ..P WKT 2010 10 12 09 59 55 31.3200 -97.3300 251.000 30.0 113.378 5.640 -999.990 -999.990 1.134 ..P WKT 2010 10 12 10 04 55 31.3200 -97.3300 251.000 122.0 122.943 5.500 -999.990 -999.990 1.229 ..P WKT 2010 10 12 10 09 55 31.3200 -97.3300 251.000 457.0 127.480 4.990 -999.990 -999.990 1.275 ..P WKT 2010 10 12 10 19 55 31.3200 -97.3300 251.000 30.0 117.329 5.090 -999.990 -999.990 1.173 ..P WKT 2010 10 12 10 24 55 31.3200 -97.3300 251.000 122.0 124.639 6.560 -999.990 -999.990 1.246 ..P WKT 2010 10 12 10 29 55 31.3200 -97.3300 251.000 457.0 125.023 5.600 -999.990 -999.990 1.250 ..P WKT 2010 10 12 10 34 55 31.3200 -97.3300 251.000 30.0 126.494 5.450 -999.990 -999.990 1.265 ..P WKT 2010 10 12 10 39 55 31.3200 -97.3300 251.000 122.0 131.221 5.180 -999.990 -999.990 1.312 ..P WKT 2010 10 12 10 44 55 31.3200 -97.3300 251.000 457.0 124.956 5.950 -999.990 -999.990 1.250 ..P WKT 2010 10 12 10 54 55 31.3200 -97.3300 251.000 30.0 132.584 5.020 -999.990 -999.990 1.326 ..P WKT 2010 10 12 10 59 55 31.3200 -97.3300 251.000 122.0 127.621 5.070 -999.990 -999.990 1.276 ..P WKT 2010 10 12 11 04 55 31.3200 -97.3300 251.000 457.0 117.234 5.730 -999.990 -999.990 1.172 ..P WKT 2010 10 12 11 09 55 31.3200 -97.3300 251.000 30.0 118.510 4.810 -999.990 -999.990 1.185 ..P WKT 2010 10 12 11 14 55 31.3200 -97.3300 251.000 122.0 128.327 5.370 -999.990 -999.990 1.283 ..P WKT 2010 10 12 11 19 55 31.3200 -97.3300 251.000 457.0 118.622 5.510 -999.990 -999.990 1.186 ..P WKT 2010 10 12 11 29 55 31.3200 -97.3300 251.000 30.0 125.926 4.990 -999.990 -999.990 1.259 ..P WKT 2010 10 12 11 34 55 31.3200 -97.3300 251.000 122.0 127.887 4.790 -999.990 -999.990 1.279 ..P WKT 2010 10 12 11 39 55 31.3200 -97.3300 251.000 457.0 121.720 4.510 -999.990 -999.990 1.217 ..P WKT 2010 10 12 11 44 55 31.3200 -97.3300 251.000 30.0 124.494 5.590 -999.990 -999.990 1.245 ..P WKT 2010 10 12 11 49 55 31.3200 -97.3300 251.000 122.0 128.622 5.140 -999.990 -999.990 1.286 ..P WKT 2010 10 12 12 09 55 31.3200 -97.3300 251.000 457.0 124.970 5.460 -999.990 -999.990 1.250 ..P WKT 2010 10 12 12 10 25 31.3200 -97.3300 251.000 457.0 125.978 4.820 -999.990 -999.990 1.260 ..P WKT 2010 10 12 12 10 55 31.3200 -97.3300 251.000 457.0 124.817 4.590 -999.990 -999.990 1.248 ..P WKT 2010 10 12 12 11 25 31.3200 -97.3300 251.000 457.0 129.617 4.600 -999.990 -999.990 1.296 ..P WKT 2010 10 12 12 11 55 31.3200 -97.3300 251.000 457.0 129.270 4.820 -999.990 -999.990 1.293 ..P WKT 2010 10 12 12 12 25 31.3200 -97.3300 251.000 457.0 127.297 4.690 -999.990 -999.990 1.273 ..P WKT 2010 10 12 12 12 55 31.3200 -97.3300 251.000 457.0 123.156 4.860 -999.990 -999.990 1.232 ..P WKT 2010 10 12 12 13 25 31.3200 -97.3300 251.000 457.0 122.537 4.510 -999.990 -999.990 1.225 ..P WKT 2010 10 12 12 13 55 31.3200 -97.3300 251.000 457.0 122.731 4.580 -999.990 -999.990 1.227 ..P WKT 2010 10 12 12 14 25 31.3200 -97.3300 251.000 457.0 124.822 4.720 -999.990 -999.990 1.248 ..P WKT 2010 10 12 12 14 55 31.3200 -97.3300 251.000 457.0 130.436 4.560 -999.990 -999.990 1.304 ..P WKT 2010 10 12 12 19 55 31.3200 -97.3300 251.000 30.0 119.913 5.140 -999.990 -999.990 1.199 ..P WKT 2010 10 12 12 24 55 31.3200 -97.3300 251.000 122.0 122.398 5.310 -999.990 -999.990 1.224 ..P WKT 2010 10 12 12 29 55 31.3200 -97.3300 251.000 457.0 120.274 5.990 -999.990 -999.990 1.203 ..P WKT 2010 10 12 12 34 55 31.3200 -97.3300 251.000 30.0 124.387 5.690 -999.990 -999.990 1.244 ..P WKT 2010 10 12 12 39 55 31.3200 -97.3300 251.000 122.0 119.550 5.460 -999.990 -999.990 1.196 ..P WKT 2010 10 12 12 44 55 31.3200 -97.3300 251.000 457.0 120.409 4.530 -999.990 -999.990 1.204 ..P WKT 2010 10 12 12 54 55 31.3200 -97.3300 251.000 30.0 126.263 4.950 -999.990 -999.990 1.263 ..P WKT 2010 10 12 12 59 55 31.3200 -97.3300 251.000 122.0 140.762 5.380 -999.990 -999.990 1.408 ..P WKT 2010 10 12 13 04 55 31.3200 -97.3300 251.000 457.0 115.074 6.520 -999.990 -999.990 1.151 ..P WKT 2010 10 12 13 09 55 31.3200 -97.3300 251.000 30.0 123.330 6.450 -999.990 -999.990 1.233 ..P WKT 2010 10 12 13 14 55 31.3200 -97.3300 251.000 122.0 145.174 5.750 -999.990 -999.990 1.452 ..P WKT 2010 10 12 13 19 55 31.3200 -97.3300 251.000 457.0 109.686 5.030 -999.990 -999.990 1.097 ..P WKT 2010 10 12 13 29 55 31.3200 -97.3300 251.000 30.0 132.425 5.200 -999.990 -999.990 1.324 ..P WKT 2010 10 12 13 34 55 31.3200 -97.3300 251.000 122.0 131.681 6.340 -999.990 -999.990 1.317 ..P WKT 2010 10 12 13 39 55 31.3200 -97.3300 251.000 457.0 111.352 5.820 -999.990 -999.990 1.114 ..P WKT 2010 10 12 13 44 55 31.3200 -97.3300 251.000 30.0 132.640 5.190 -999.990 -999.990 1.326 ..P WKT 2010 10 12 13 49 55 31.3200 -97.3300 251.000 122.0 131.624 4.860 -999.990 -999.990 1.316 ..P WKT 2010 10 12 13 54 55 31.3200 -97.3300 251.000 457.0 110.463 4.580 -999.990 -999.990 1.105 ..P WKT 2010 10 12 14 04 55 31.3200 -97.3300 251.000 30.0 123.357 4.800 -999.990 -999.990 1.234 ..P WKT 2010 10 12 14 09 55 31.3200 -97.3300 251.000 122.0 119.165 5.520 -999.990 -999.990 1.192 ..P WKT 2010 10 12 14 14 55 31.3200 -97.3300 251.000 457.0 110.068 5.190 -999.990 -999.990 1.101 ..P WKT 2010 10 12 14 19 55 31.3200 -97.3300 251.000 30.0 128.899 5.090 -999.990 -999.990 1.289 ..P WKT 2010 10 12 14 24 55 31.3200 -97.3300 251.000 122.0 125.388 5.030 -999.990 -999.990 1.254 ..P WKT 2010 10 12 14 29 55 31.3200 -97.3300 251.000 457.0 117.376 5.410 -999.990 -999.990 1.174 ..P WKT 2010 10 12 14 39 55 31.3200 -97.3300 251.000 30.0 130.723 4.820 -999.990 -999.990 1.307 ..P WKT 2010 10 12 14 44 55 31.3200 -97.3300 251.000 122.0 133.269 4.900 -999.990 -999.990 1.333 ..P WKT 2010 10 12 14 49 55 31.3200 -97.3300 251.000 457.0 120.535 4.710 -999.990 -999.990 1.205 ..P WKT 2010 10 12 14 54 55 31.3200 -97.3300 251.000 30.0 135.909 5.570 -999.990 -999.990 1.359 ..P WKT 2010 10 12 14 59 55 31.3200 -97.3300 251.000 122.0 129.858 4.610 -999.990 -999.990 1.299 ..P WKT 2010 10 12 15 04 55 31.3200 -97.3300 251.000 457.0 113.838 5.220 -999.990 -999.990 1.138 ..P WKT 2010 10 12 15 14 55 31.3200 -97.3300 251.000 30.0 124.882 6.130 -999.990 -999.990 1.249 ..P WKT 2010 10 12 15 19 55 31.3200 -97.3300 251.000 122.0 123.820 4.670 -999.990 -999.990 1.238 ..P WKT 2010 10 12 15 24 55 31.3200 -97.3300 251.000 457.0 111.687 5.830 -999.990 -999.990 1.117 ..P WKT 2010 10 12 15 29 55 31.3200 -97.3300 251.000 30.0 125.932 5.810 -999.990 -999.990 1.259 ..P WKT 2010 10 12 15 34 55 31.3200 -97.3300 251.000 122.0 128.973 6.590 -999.990 -999.990 1.290 ..P WKT 2010 10 12 15 39 55 31.3200 -97.3300 251.000 457.0 115.875 4.990 -999.990 -999.990 1.159 ..P WKT 2010 10 12 15 49 55 31.3200 -97.3300 251.000 30.0 124.749 5.740 -999.990 -999.990 1.247 ..P WKT 2010 10 12 15 54 55 31.3200 -97.3300 251.000 122.0 127.029 5.350 -999.990 -999.990 1.270 ..P WKT 2010 10 12 15 59 55 31.3200 -97.3300 251.000 457.0 115.757 6.180 -999.990 -999.990 1.158 ..P WKT 2010 10 12 16 04 55 31.3200 -97.3300 251.000 30.0 120.227 6.110 -999.990 -999.990 1.202 ..P WKT 2010 10 12 16 09 55 31.3200 -97.3300 251.000 122.0 126.478 5.360 -999.990 -999.990 1.265 ..P WKT 2010 10 12 16 14 55 31.3200 -97.3300 251.000 457.0 113.555 4.650 -999.990 -999.990 1.136 ..P WKT 2010 10 12 16 24 55 31.3200 -97.3300 251.000 30.0 132.173 4.760 -999.990 -999.990 1.322 ..P WKT 2010 10 12 16 29 55 31.3200 -97.3300 251.000 122.0 123.432 5.770 -999.990 -999.990 1.234 ..P WKT 2010 10 12 16 34 55 31.3200 -97.3300 251.000 457.0 118.528 6.230 -999.990 -999.990 1.185 ..P WKT 2010 10 12 16 39 55 31.3200 -97.3300 251.000 30.0 119.380 6.470 -999.990 -999.990 1.194 ..P WKT 2010 10 12 16 44 55 31.3200 -97.3300 251.000 122.0 116.941 5.140 -999.990 -999.990 1.169 ..P WKT 2010 10 12 16 49 55 31.3200 -97.3300 251.000 457.0 113.678 4.480 -999.990 -999.990 1.137 ..P WKT 2010 10 12 17 04 55 31.3200 -97.3300 251.000 30.0 115.069 4.950 -999.990 -999.990 1.151 ..P WKT 2010 10 12 17 09 55 31.3200 -97.3300 251.000 122.0 123.990 5.240 -999.990 -999.990 1.240 ..P WKT 2010 10 12 17 14 55 31.3200 -97.3300 251.000 457.0 112.585 5.480 -999.990 -999.990 1.126 ..P WKT 2010 10 12 17 19 55 31.3200 -97.3300 251.000 30.0 118.213 4.580 -999.990 -999.990 1.182 ..P WKT 2010 10 12 17 24 55 31.3200 -97.3300 251.000 122.0 115.597 4.720 -999.990 -999.990 1.156 ..P WKT 2010 10 12 17 29 55 31.3200 -97.3300 251.000 457.0 121.503 4.550 -999.990 -999.990 1.215 ..P WKT 2010 10 12 17 39 55 31.3200 -97.3300 251.000 30.0 125.302 4.280 -999.990 -999.990 1.253 ..P WKT 2010 10 12 17 44 55 31.3200 -97.3300 251.000 122.0 128.144 4.520 -999.990 -999.990 1.281 ..P WKT 2010 10 12 17 49 55 31.3200 -97.3300 251.000 457.0 122.731 5.170 -999.990 -999.990 1.227 ..P WKT 2010 10 12 17 54 55 31.3200 -97.3300 251.000 30.0 125.023 5.950 -999.990 -999.990 1.250 ..P WKT 2010 10 12 17 59 55 31.3200 -97.3300 251.000 122.0 122.912 5.140 -999.990 -999.990 1.229 ..P WKT 2010 10 12 18 04 55 31.3200 -97.3300 251.000 457.0 128.371 4.580 -999.990 -999.990 1.284 ..P WKT 2010 10 12 18 14 55 31.3200 -97.3300 251.000 30.0 122.217 5.130 -999.990 -999.990 1.222 ..P WKT 2010 10 12 18 19 55 31.3200 -97.3300 251.000 122.0 126.854 5.200 -999.990 -999.990 1.269 ..P WKT 2010 10 12 18 24 55 31.3200 -97.3300 251.000 457.0 120.192 4.950 -999.990 -999.990 1.202 ..P WKT 2010 10 12 18 29 55 31.3200 -97.3300 251.000 30.0 119.868 4.850 -999.990 -999.990 1.199 ..P WKT 2010 10 12 18 34 55 31.3200 -97.3300 251.000 122.0 126.162 5.060 -999.990 -999.990 1.262 ..P WKT 2010 10 12 18 39 55 31.3200 -97.3300 251.000 457.0 123.495 4.740 -999.990 -999.990 1.235 ..P WKT 2010 10 12 18 49 55 31.3200 -97.3300 251.000 30.0 119.398 4.440 -999.990 -999.990 1.194 ..P WKT 2010 10 12 18 54 55 31.3200 -97.3300 251.000 122.0 126.526 5.050 -999.990 -999.990 1.265 ..P WKT 2010 10 12 18 59 55 31.3200 -97.3300 251.000 457.0 122.199 4.530 -999.990 -999.990 1.222 ..P WKT 2010 10 12 19 04 55 31.3200 -97.3300 251.000 30.0 121.599 5.060 -999.990 -999.990 1.216 ..P WKT 2010 10 12 19 09 55 31.3200 -97.3300 251.000 122.0 121.551 5.380 -999.990 -999.990 1.216 ..P WKT 2010 10 12 19 14 55 31.3200 -97.3300 251.000 457.0 113.767 4.190 -999.990 -999.990 1.138 ..P WKT 2010 10 12 19 24 55 31.3200 -97.3300 251.000 30.0 114.714 4.420 -999.990 -999.990 1.147 ..P WKT 2010 10 12 19 29 55 31.3200 -97.3300 251.000 122.0 118.199 5.470 -999.990 -999.990 1.182 ..P WKT 2010 10 12 19 34 55 31.3200 -97.3300 251.000 457.0 112.698 4.660 -999.990 -999.990 1.127 ..P WKT 2010 10 12 19 39 55 31.3200 -97.3300 251.000 30.0 118.260 4.510 -999.990 -999.990 1.183 ..P WKT 2010 10 12 19 44 55 31.3200 -97.3300 251.000 122.0 118.981 4.630 -999.990 -999.990 1.190 ..P WKT 2010 10 12 19 49 55 31.3200 -97.3300 251.000 457.0 117.489 4.230 -999.990 -999.990 1.175 ..P WKT 2010 10 12 19 59 55 31.3200 -97.3300 251.000 30.0 115.552 5.050 -999.990 -999.990 1.156 ..P WKT 2010 10 12 20 04 55 31.3200 -97.3300 251.000 122.0 116.629 4.590 -999.990 -999.990 1.166 ..P WKT 2010 10 12 20 09 55 31.3200 -97.3300 251.000 457.0 113.414 5.330 -999.990 -999.990 1.134 ..P WKT 2010 10 12 20 14 55 31.3200 -97.3300 251.000 30.0 108.813 4.950 -999.990 -999.990 1.088 ..P WKT 2010 10 12 20 19 55 31.3200 -97.3300 251.000 122.0 115.848 5.470 -999.990 -999.990 1.158 ..P WKT 2010 10 12 20 24 55 31.3200 -97.3300 251.000 457.0 115.125 5.480 -999.990 -999.990 1.151 ..P WKT 2010 10 12 20 34 55 31.3200 -97.3300 251.000 30.0 117.640 5.780 -999.990 -999.990 1.176 ..P WKT 2010 10 12 20 39 55 31.3200 -97.3300 251.000 122.0 118.938 5.280 -999.990 -999.990 1.189 ..P WKT 2010 10 12 20 44 55 31.3200 -97.3300 251.000 457.0 113.023 5.730 -999.990 -999.990 1.130 ..P WKT 2010 10 12 20 49 55 31.3200 -97.3300 251.000 30.0 115.431 5.030 -999.990 -999.990 1.154 ..P WKT 2010 10 12 20 54 55 31.3200 -97.3300 251.000 122.0 122.836 4.870 -999.990 -999.990 1.228 ..P WKT 2010 10 12 20 59 55 31.3200 -97.3300 251.000 457.0 111.364 4.810 -999.990 -999.990 1.114 ..P WKT 2010 10 12 21 09 55 31.3200 -97.3300 251.000 30.0 112.850 4.310 -999.990 -999.990 1.129 ..P WKT 2010 10 12 21 14 55 31.3200 -97.3300 251.000 122.0 117.483 4.450 -999.990 -999.990 1.175 ..P WKT 2010 10 12 21 19 55 31.3200 -97.3300 251.000 457.0 119.617 4.410 -999.990 -999.990 1.196 ..P WKT 2010 10 12 21 24 55 31.3200 -97.3300 251.000 30.0 114.247 4.490 -999.990 -999.990 1.142 ..P WKT 2010 10 12 21 29 55 31.3200 -97.3300 251.000 122.0 120.552 4.320 -999.990 -999.990 1.206 ..P WKT 2010 10 12 21 34 55 31.3200 -97.3300 251.000 457.0 122.410 4.790 -999.990 -999.990 1.224 ..P WKT 2010 10 12 21 44 55 31.3200 -97.3300 251.000 30.0 122.413 4.130 -999.990 -999.990 1.224 ..P WKT 2010 10 12 21 49 55 31.3200 -97.3300 251.000 122.0 123.339 4.330 -999.990 -999.990 1.233 ..P WKT 2010 10 12 21 54 55 31.3200 -97.3300 251.000 457.0 122.038 4.870 -999.990 -999.990 1.220 ..P WKT 2010 10 12 21 59 55 31.3200 -97.3300 251.000 30.0 120.180 4.460 -999.990 -999.990 1.202 ..P WKT 2010 10 12 22 04 55 31.3200 -97.3300 251.000 122.0 119.992 4.280 -999.990 -999.990 1.200 ..P WKT 2010 10 12 22 09 55 31.3200 -97.3300 251.000 457.0 116.043 4.570 -999.990 -999.990 1.160 ..P WKT 2010 10 12 22 19 55 31.3200 -97.3300 251.000 30.0 109.236 4.430 -999.990 -999.990 1.092 ..P WKT 2010 10 12 22 24 55 31.3200 -97.3300 251.000 122.0 119.757 4.720 -999.990 -999.990 1.198 ..P WKT 2010 10 12 22 29 55 31.3200 -97.3300 251.000 457.0 115.366 4.870 -999.990 -999.990 1.154 ..P WKT 2010 10 12 22 34 55 31.3200 -97.3300 251.000 30.0 117.667 4.950 -999.990 -999.990 1.177 ..P WKT 2010 10 12 22 39 55 31.3200 -97.3300 251.000 122.0 119.828 4.560 -999.990 -999.990 1.198 ..P WKT 2010 10 12 22 44 55 31.3200 -97.3300 251.000 457.0 113.900 5.260 -999.990 -999.990 1.139 ..P WKT 2010 10 12 22 54 55 31.3200 -97.3300 251.000 30.0 121.436 5.010 -999.990 -999.990 1.214 ..P WKT 2010 10 12 22 59 55 31.3200 -97.3300 251.000 122.0 123.462 4.720 -999.990 -999.990 1.235 ..P WKT 2010 10 12 23 04 55 31.3200 -97.3300 251.000 457.0 119.623 5.640 -999.990 -999.990 1.196 ..P WKT 2010 10 12 23 09 55 31.3200 -97.3300 251.000 30.0 119.693 4.550 -999.990 -999.990 1.197 ..P WKT 2010 10 12 23 14 55 31.3200 -97.3300 251.000 122.0 122.140 5.700 -999.990 -999.990 1.221 ..P WKT 2010 10 12 23 19 55 31.3200 -97.3300 251.000 457.0 117.738 5.190 -999.990 -999.990 1.177 ..P WKT 2010 10 12 23 29 55 31.3200 -97.3300 251.000 30.0 123.973 4.230 -999.990 -999.990 1.240 ..P WKT 2010 10 12 23 34 55 31.3200 -97.3300 251.000 122.0 123.008 4.480 -999.990 -999.990 1.230 ..P WKT 2010 10 12 23 39 55 31.3200 -97.3300 251.000 457.0 120.365 4.490 -999.990 -999.990 1.204 ..P WKT 2010 10 12 23 44 55 31.3200 -97.3300 251.000 30.0 120.938 4.740 -999.990 -999.990 1.209 ..P WKT 2010 10 12 23 49 55 31.3200 -97.3300 251.000 122.0 124.030 4.490 -999.990 -999.990 1.240 ..P WKT 2010 10 13 00 09 55 31.3200 -97.3300 251.000 457.0 116.720 4.270 -999.990 -999.990 1.167 ..P WKT 2010 10 13 00 10 25 31.3200 -97.3300 251.000 457.0 113.891 4.530 -999.990 -999.990 1.139 ..P WKT 2010 10 13 00 10 55 31.3200 -97.3300 251.000 457.0 115.262 4.260 -999.990 -999.990 1.153 ..P WKT 2010 10 13 00 11 25 31.3200 -97.3300 251.000 457.0 114.953 4.280 -999.990 -999.990 1.150 ..P WKT 2010 10 13 00 11 55 31.3200 -97.3300 251.000 457.0 114.924 4.290 -999.990 -999.990 1.149 ..P WKT 2010 10 13 00 12 25 31.3200 -97.3300 251.000 457.0 117.694 4.280 -999.990 -999.990 1.177 ..P WKT 2010 10 13 00 12 55 31.3200 -97.3300 251.000 457.0 118.784 4.250 -999.990 -999.990 1.188 ..P WKT 2010 10 13 00 13 25 31.3200 -97.3300 251.000 457.0 114.555 4.570 -999.990 -999.990 1.146 ..P WKT 2010 10 13 00 13 55 31.3200 -97.3300 251.000 457.0 120.966 4.630 -999.990 -999.990 1.210 ..P WKT 2010 10 13 00 14 25 31.3200 -97.3300 251.000 457.0 114.777 4.320 -999.990 -999.990 1.148 ..P WKT 2010 10 13 00 14 55 31.3200 -97.3300 251.000 457.0 113.348 4.720 -999.990 -999.990 1.133 ..P WKT 2010 10 13 00 19 55 31.3200 -97.3300 251.000 30.0 121.175 4.670 -999.990 -999.990 1.212 ..P WKT 2010 10 13 00 24 55 31.3200 -97.3300 251.000 122.0 120.882 4.960 -999.990 -999.990 1.209 ..P WKT 2010 10 13 00 29 55 31.3200 -97.3300 251.000 457.0 117.790 5.250 -999.990 -999.990 1.178 ..P WKT 2010 10 13 00 34 55 31.3200 -97.3300 251.000 30.0 113.860 4.740 -999.990 -999.990 1.139 ..P WKT 2010 10 13 00 39 55 31.3200 -97.3300 251.000 122.0 118.326 5.190 -999.990 -999.990 1.183 ..P WKT 2010 10 13 00 44 55 31.3200 -97.3300 251.000 457.0 117.753 4.820 -999.990 -999.990 1.178 ..P WKT 2010 10 13 00 54 55 31.3200 -97.3300 251.000 30.0 119.487 4.820 -999.990 -999.990 1.195 ..P WKT 2010 10 13 00 59 55 31.3200 -97.3300 251.000 122.0 111.721 4.750 -999.990 -999.990 1.117 ..P WKT 2010 10 13 01 04 55 31.3200 -97.3300 251.000 457.0 114.866 5.410 -999.990 -999.990 1.149 ..P WKT 2010 10 13 01 09 55 31.3200 -97.3300 251.000 30.0 118.291 4.560 -999.990 -999.990 1.183 ..P WKT 2010 10 13 01 14 55 31.3200 -97.3300 251.000 122.0 116.401 4.700 -999.990 -999.990 1.164 ..P WKT 2010 10 13 01 19 55 31.3200 -97.3300 251.000 457.0 120.943 4.410 -999.990 -999.990 1.209 ..P WKT 2010 10 13 01 29 55 31.3200 -97.3300 251.000 30.0 117.382 5.260 -999.990 -999.990 1.174 ..P WKT 2010 10 13 01 34 55 31.3200 -97.3300 251.000 122.0 120.745 4.740 -999.990 -999.990 1.207 ..P WKT 2010 10 13 01 39 55 31.3200 -97.3300 251.000 457.0 120.473 4.840 -999.990 -999.990 1.205 ..P WKT 2010 10 13 01 44 55 31.3200 -97.3300 251.000 30.0 114.609 5.020 -999.990 -999.990 1.146 ..P WKT 2010 10 13 01 49 55 31.3200 -97.3300 251.000 122.0 123.843 5.500 -999.990 -999.990 1.238 ..P WKT 2010 10 13 01 54 55 31.3200 -97.3300 251.000 457.0 124.549 5.700 -999.990 -999.990 1.245 ..P WKT 2010 10 13 02 04 55 31.3200 -97.3300 251.000 30.0 121.149 5.730 -999.990 -999.990 1.211 ..P WKT 2010 10 13 02 09 55 31.3200 -97.3300 251.000 122.0 121.376 5.480 -999.990 -999.990 1.214 ..P WKT 2010 10 13 02 14 55 31.3200 -97.3300 251.000 457.0 119.786 5.100 -999.990 -999.990 1.198 ..P WKT 2010 10 13 02 19 55 31.3200 -97.3300 251.000 30.0 121.550 4.770 -999.990 -999.990 1.216 ..P WKT 2010 10 13 02 24 55 31.3200 -97.3300 251.000 122.0 125.549 4.730 -999.990 -999.990 1.255 ..P WKT 2010 10 13 02 29 55 31.3200 -97.3300 251.000 457.0 122.143 4.750 -999.990 -999.990 1.221 ..P WKT 2010 10 13 02 39 55 31.3200 -97.3300 251.000 30.0 124.453 4.670 -999.990 -999.990 1.245 ..P WKT 2010 10 13 02 44 55 31.3200 -97.3300 251.000 122.0 128.072 4.430 -999.990 -999.990 1.281 ..P WKT 2010 10 13 02 49 55 31.3200 -97.3300 251.000 457.0 128.477 4.660 -999.990 -999.990 1.285 ..P WKT 2010 10 13 02 54 55 31.3200 -97.3300 251.000 30.0 128.045 4.940 -999.990 -999.990 1.280 ..P WKT 2010 10 13 02 59 55 31.3200 -97.3300 251.000 122.0 122.447 4.560 -999.990 -999.990 1.224 ..P WKT 2010 10 13 03 04 55 31.3200 -97.3300 251.000 457.0 119.921 5.720 -999.990 -999.990 1.199 ..P WKT 2010 10 13 03 14 55 31.3200 -97.3300 251.000 30.0 124.184 5.040 -999.990 -999.990 1.242 ..P WKT 2010 10 13 03 19 55 31.3200 -97.3300 251.000 122.0 125.806 5.150 -999.990 -999.990 1.258 ..P WKT 2010 10 13 03 24 55 31.3200 -97.3300 251.000 457.0 121.426 4.880 -999.990 -999.990 1.214 ..P WKT 2010 10 13 03 29 55 31.3200 -97.3300 251.000 30.0 125.840 4.710 -999.990 -999.990 1.258 ..P WKT 2010 10 13 03 34 55 31.3200 -97.3300 251.000 122.0 129.556 5.170 -999.990 -999.990 1.296 ..P WKT 2010 10 13 03 39 55 31.3200 -97.3300 251.000 457.0 119.594 4.970 -999.990 -999.990 1.196 ..P WKT 2010 10 13 03 49 55 31.3200 -97.3300 251.000 30.0 120.785 4.970 -999.990 -999.990 1.208 ..P WKT 2010 10 13 03 54 55 31.3200 -97.3300 251.000 122.0 125.935 4.520 -999.990 -999.990 1.259 ..P WKT 2010 10 13 03 59 55 31.3200 -97.3300 251.000 457.0 119.504 4.570 -999.990 -999.990 1.195 ..P WKT 2010 10 13 04 04 55 31.3200 -97.3300 251.000 30.0 119.771 4.780 -999.990 -999.990 1.198 ..P WKT 2010 10 13 04 09 55 31.3200 -97.3300 251.000 122.0 120.316 5.120 -999.990 -999.990 1.203 ..P WKT 2010 10 13 04 14 55 31.3200 -97.3300 251.000 457.0 115.003 4.740 -999.990 -999.990 1.150 ..P WKT 2010 10 13 04 24 55 31.3200 -97.3300 251.000 30.0 118.644 4.440 -999.990 -999.990 1.186 ..P WKT 2010 10 13 04 29 55 31.3200 -97.3300 251.000 122.0 120.067 4.280 -999.990 -999.990 1.201 ..P WKT 2010 10 13 04 34 55 31.3200 -97.3300 251.000 457.0 124.835 4.270 -999.990 -999.990 1.248 ..P WKT 2010 10 13 04 39 55 31.3200 -97.3300 251.000 30.0 115.938 4.460 -999.990 -999.990 1.159 ..P WKT 2010 10 13 04 44 55 31.3200 -97.3300 251.000 122.0 122.100 4.570 -999.990 -999.990 1.221 ..P WKT 2010 10 13 04 49 55 31.3200 -97.3300 251.000 457.0 117.945 4.370 -999.990 -999.990 1.179 ..P WKT 2010 10 13 05 04 55 31.3200 -97.3300 251.000 30.0 118.158 4.450 -999.990 -999.990 1.182 ..P WKT 2010 10 13 05 09 55 31.3200 -97.3300 251.000 122.0 117.274 4.350 -999.990 -999.990 1.173 ..P WKT 2010 10 13 05 14 55 31.3200 -97.3300 251.000 457.0 116.948 4.390 -999.990 -999.990 1.169 ..P WKT 2010 10 13 05 19 55 31.3200 -97.3300 251.000 30.0 119.409 6.190 -999.990 -999.990 1.194 ..P WKT 2010 10 13 05 24 55 31.3200 -97.3300 251.000 122.0 120.755 4.400 -999.990 -999.990 1.208 ..P WKT 2010 10 13 05 29 55 31.3200 -97.3300 251.000 457.0 110.118 4.340 -999.990 -999.990 1.101 ..P WKT 2010 10 13 05 39 55 31.3200 -97.3300 251.000 30.0 124.310 4.510 -999.990 -999.990 1.243 ..P WKT 2010 10 13 05 44 55 31.3200 -97.3300 251.000 122.0 119.043 5.000 -999.990 -999.990 1.190 ..P WKT 2010 10 13 05 49 55 31.3200 -97.3300 251.000 457.0 120.185 4.960 -999.990 -999.990 1.202 ..P WKT 2010 10 13 05 54 55 31.3200 -97.3300 251.000 30.0 119.933 6.540 -999.990 -999.990 1.199 ..P WKT 2010 10 13 05 59 55 31.3200 -97.3300 251.000 122.0 125.114 4.650 -999.990 -999.990 1.251 ..P WKT 2010 10 13 06 04 55 31.3200 -97.3300 251.000 457.0 127.230 5.750 -999.990 -999.990 1.272 ..P WKT 2010 10 13 06 14 55 31.3200 -97.3300 251.000 30.0 128.337 5.320 -999.990 -999.990 1.283 ..P WKT 2010 10 13 06 19 55 31.3200 -97.3300 251.000 122.0 119.951 4.890 -999.990 -999.990 1.200 ..P WKT 2010 10 13 06 24 55 31.3200 -97.3300 251.000 457.0 117.134 5.130 -999.990 -999.990 1.171 ..P WKT 2010 10 13 06 29 55 31.3200 -97.3300 251.000 30.0 121.418 6.280 -999.990 -999.990 1.214 ..P WKT 2010 10 13 06 34 55 31.3200 -97.3300 251.000 122.0 119.019 5.230 -999.990 -999.990 1.190 ..P WKT 2010 10 13 06 39 55 31.3200 -97.3300 251.000 457.0 118.291 5.760 -999.990 -999.990 1.183 ..P WKT 2010 10 13 06 49 55 31.3200 -97.3300 251.000 30.0 121.964 5.570 -999.990 -999.990 1.220 ..P WKT 2010 10 13 06 54 55 31.3200 -97.3300 251.000 122.0 122.885 5.580 -999.990 -999.990 1.229 ..P WKT 2010 10 13 06 59 55 31.3200 -97.3300 251.000 457.0 123.111 6.230 -999.990 -999.990 1.231 ..P WKT 2010 10 13 07 04 55 31.3200 -97.3300 251.000 30.0 116.937 5.290 -999.990 -999.990 1.169 ..P WKT 2010 10 13 07 09 55 31.3200 -97.3300 251.000 122.0 122.728 6.280 -999.990 -999.990 1.227 ..P WKT 2010 10 13 07 14 55 31.3200 -97.3300 251.000 457.0 122.676 5.230 -999.990 -999.990 1.227 ..P WKT 2010 10 13 07 24 55 31.3200 -97.3300 251.000 30.0 115.497 5.510 -999.990 -999.990 1.155 ..P WKT 2010 10 13 07 29 55 31.3200 -97.3300 251.000 122.0 119.777 4.890 -999.990 -999.990 1.198 ..P WKT 2010 10 13 07 34 55 31.3200 -97.3300 251.000 457.0 126.976 4.830 -999.990 -999.990 1.270 ..P WKT 2010 10 13 07 39 55 31.3200 -97.3300 251.000 30.0 113.871 4.690 -999.990 -999.990 1.139 ..P WKT 2010 10 13 07 44 55 31.3200 -97.3300 251.000 122.0 123.573 4.710 -999.990 -999.990 1.236 ..P WKT 2010 10 13 07 49 55 31.3200 -97.3300 251.000 457.0 123.123 4.610 -999.990 -999.990 1.231 ..P WKT 2010 10 13 07 59 55 31.3200 -97.3300 251.000 30.0 120.575 4.580 -999.990 -999.990 1.206 ..P WKT 2010 10 13 08 04 55 31.3200 -97.3300 251.000 122.0 130.294 4.750 -999.990 -999.990 1.303 ..P WKT 2010 10 13 08 09 55 31.3200 -97.3300 251.000 457.0 113.600 6.120 -999.990 -999.990 1.136 ..P WKT 2010 10 13 08 14 55 31.3200 -97.3300 251.000 30.0 109.974 6.610 -999.990 -999.990 1.100 ..P WKT 2010 10 13 08 19 55 31.3200 -97.3300 251.000 122.0 139.984 5.880 -999.990 -999.990 1.400 ..P WKT 2010 10 13 08 24 55 31.3200 -97.3300 251.000 457.0 116.066 4.930 -999.990 -999.990 1.161 ..P WKT 2010 10 13 08 34 55 31.3200 -97.3300 251.000 30.0 116.954 6.070 -999.990 -999.990 1.170 ..P WKT 2010 10 13 08 39 55 31.3200 -97.3300 251.000 122.0 160.650 7.010 -999.990 -999.990 1.607 ..P WKT 2010 10 13 08 44 55 31.3200 -97.3300 251.000 457.0 120.979 6.320 -999.990 -999.990 1.210 ..P WKT 2010 10 13 08 49 55 31.3200 -97.3300 251.000 30.0 120.768 6.800 -999.990 -999.990 1.208 ..P WKT 2010 10 13 08 54 55 31.3200 -97.3300 251.000 122.0 176.678 6.580 -999.990 -999.990 1.767 ..P WKT 2010 10 13 08 59 55 31.3200 -97.3300 251.000 457.0 120.624 5.190 -999.990 -999.990 1.206 ..P WKT 2010 10 13 09 09 55 31.3200 -97.3300 251.000 30.0 130.440 5.230 -999.990 -999.990 1.304 ..P WKT 2010 10 13 09 14 55 31.3200 -97.3300 251.000 122.0 154.909 6.280 -999.990 -999.990 1.549 ..P WKT 2010 10 13 09 19 55 31.3200 -97.3300 251.000 457.0 124.938 6.710 -999.990 -999.990 1.249 ..P WKT 2010 10 13 09 24 55 31.3200 -97.3300 251.000 30.0 129.409 5.840 -999.990 -999.990 1.294 ..P WKT 2010 10 13 09 29 55 31.3200 -97.3300 251.000 122.0 149.151 6.180 -999.990 -999.990 1.492 ..P WKT 2010 10 13 09 34 55 31.3200 -97.3300 251.000 457.0 120.298 6.090 -999.990 -999.990 1.203 ..P WKT 2010 10 13 09 44 55 31.3200 -97.3300 251.000 30.0 126.084 6.400 -999.990 -999.990 1.261 ..P WKT 2010 10 13 09 49 55 31.3200 -97.3300 251.000 122.0 153.633 5.820 -999.990 -999.990 1.536 ..P WKT 2010 10 13 09 54 55 31.3200 -97.3300 251.000 457.0 119.832 5.420 -999.990 -999.990 1.198 ..P WKT 2010 10 13 09 59 55 31.3200 -97.3300 251.000 30.0 133.639 5.760 -999.990 -999.990 1.336 ..P WKT 2010 10 13 10 04 55 31.3200 -97.3300 251.000 122.0 123.713 4.870 -999.990 -999.990 1.237 ..P WKT 2010 10 13 10 09 55 31.3200 -97.3300 251.000 457.0 112.401 4.930 -999.990 -999.990 1.124 ..P WKT 2010 10 13 10 19 55 31.3200 -97.3300 251.000 30.0 132.951 5.840 -999.990 -999.990 1.330 ..P WKT 2010 10 13 10 24 55 31.3200 -97.3300 251.000 122.0 140.528 4.960 -999.990 -999.990 1.405 ..P WKT 2010 10 13 10 29 55 31.3200 -97.3300 251.000 457.0 113.007 5.110 -999.990 -999.990 1.130 ..P WKT 2010 10 13 10 34 55 31.3200 -97.3300 251.000 30.0 126.133 4.980 -999.990 -999.990 1.261 ..P WKT 2010 10 13 10 39 55 31.3200 -97.3300 251.000 122.0 132.461 4.870 -999.990 -999.990 1.325 ..P WKT 2010 10 13 10 44 55 31.3200 -97.3300 251.000 457.0 121.451 4.970 -999.990 -999.990 1.215 ..P WKT 2010 10 13 10 54 55 31.3200 -97.3300 251.000 30.0 130.460 4.910 -999.990 -999.990 1.305 ..P WKT 2010 10 13 10 59 55 31.3200 -97.3300 251.000 122.0 137.577 5.020 -999.990 -999.990 1.376 ..P WKT 2010 10 13 11 04 55 31.3200 -97.3300 251.000 457.0 113.637 5.550 -999.990 -999.990 1.136 ..P WKT 2010 10 13 11 09 55 31.3200 -97.3300 251.000 30.0 134.897 5.390 -999.990 -999.990 1.349 ..P WKT 2010 10 13 11 14 55 31.3200 -97.3300 251.000 122.0 132.586 5.630 -999.990 -999.990 1.326 ..P WKT 2010 10 13 11 19 55 31.3200 -97.3300 251.000 457.0 116.413 5.360 -999.990 -999.990 1.164 ..P WKT 2010 10 13 11 29 55 31.3200 -97.3300 251.000 30.0 132.284 5.870 -999.990 -999.990 1.323 ..P WKT 2010 10 13 11 34 55 31.3200 -97.3300 251.000 122.0 123.850 5.510 -999.990 -999.990 1.238 ..P WKT 2010 10 13 11 39 55 31.3200 -97.3300 251.000 457.0 107.381 5.960 -999.990 -999.990 1.074 ..P WKT 2010 10 13 11 44 55 31.3200 -97.3300 251.000 30.0 130.546 5.440 -999.990 -999.990 1.305 ..P WKT 2010 10 13 11 49 55 31.3200 -97.3300 251.000 122.0 126.410 5.430 -999.990 -999.990 1.264 ..P WKT 2010 10 13 12 09 55 31.3200 -97.3300 251.000 457.0 109.870 4.980 -999.990 -999.990 1.099 ..P WKT 2010 10 13 12 10 25 31.3200 -97.3300 251.000 457.0 111.237 5.260 -999.990 -999.990 1.112 ..P WKT 2010 10 13 12 10 55 31.3200 -97.3300 251.000 457.0 115.097 4.950 -999.990 -999.990 1.151 ..P WKT 2010 10 13 12 11 25 31.3200 -97.3300 251.000 457.0 113.415 4.940 -999.990 -999.990 1.134 ..P WKT 2010 10 13 12 11 55 31.3200 -97.3300 251.000 457.0 111.457 5.370 -999.990 -999.990 1.115 ..P WKT 2010 10 13 12 12 25 31.3200 -97.3300 251.000 457.0 110.884 5.250 -999.990 -999.990 1.109 ..P WKT 2010 10 13 12 12 55 31.3200 -97.3300 251.000 457.0 108.372 5.370 -999.990 -999.990 1.084 ..P WKT 2010 10 13 12 13 25 31.3200 -97.3300 251.000 457.0 109.462 5.370 -999.990 -999.990 1.095 ..P WKT 2010 10 13 12 13 55 31.3200 -97.3300 251.000 457.0 117.477 4.840 -999.990 -999.990 1.175 ..P WKT 2010 10 13 12 14 25 31.3200 -97.3300 251.000 457.0 114.411 5.010 -999.990 -999.990 1.144 ..P WKT 2010 10 13 12 14 55 31.3200 -97.3300 251.000 457.0 117.717 5.060 -999.990 -999.990 1.177 ..P WKT 2010 10 13 12 19 55 31.3200 -97.3300 251.000 30.0 127.226 5.230 -999.990 -999.990 1.272 ..P WKT 2010 10 13 12 24 55 31.3200 -97.3300 251.000 122.0 129.532 5.200 -999.990 -999.990 1.295 ..P WKT 2010 10 13 12 29 55 31.3200 -97.3300 251.000 457.0 118.814 5.420 -999.990 -999.990 1.188 ..P WKT 2010 10 13 12 34 55 31.3200 -97.3300 251.000 30.0 130.818 5.130 -999.990 -999.990 1.308 ..P WKT 2010 10 13 12 39 55 31.3200 -97.3300 251.000 122.0 124.533 5.200 -999.990 -999.990 1.245 ..P WKT 2010 10 13 12 44 55 31.3200 -97.3300 251.000 457.0 121.851 4.640 -999.990 -999.990 1.219 ..P WKT 2010 10 13 12 54 55 31.3200 -97.3300 251.000 30.0 127.509 4.640 -999.990 -999.990 1.275 ..P WKT 2010 10 13 12 59 55 31.3200 -97.3300 251.000 122.0 133.079 4.640 -999.990 -999.990 1.331 ..P WKT 2010 10 13 13 04 55 31.3200 -97.3300 251.000 457.0 125.070 5.230 -999.990 -999.990 1.251 ..P WKT 2010 10 13 13 09 55 31.3200 -97.3300 251.000 30.0 130.640 4.770 -999.990 -999.990 1.306 ..P WKT 2010 10 13 13 14 55 31.3200 -97.3300 251.000 122.0 133.715 4.630 -999.990 -999.990 1.337 ..P WKT 2010 10 13 13 19 55 31.3200 -97.3300 251.000 457.0 122.657 4.280 -999.990 -999.990 1.227 ..P WKT 2010 10 13 13 29 55 31.3200 -97.3300 251.000 30.0 134.945 4.510 -999.990 -999.990 1.349 ..P WKT 2010 10 13 13 34 55 31.3200 -97.3300 251.000 122.0 139.724 4.760 -999.990 -999.990 1.397 ..P WKT 2010 10 13 13 39 55 31.3200 -97.3300 251.000 457.0 128.844 5.040 -999.990 -999.990 1.288 ..P WKT 2010 10 13 13 44 55 31.3200 -97.3300 251.000 30.0 138.611 5.090 -999.990 -999.990 1.386 ..P WKT 2010 10 13 13 49 55 31.3200 -97.3300 251.000 122.0 139.786 5.140 -999.990 -999.990 1.398 ..P WKT 2010 10 13 13 54 55 31.3200 -97.3300 251.000 457.0 126.550 5.340 -999.990 -999.990 1.266 ..P WKT 2010 10 13 14 04 55 31.3200 -97.3300 251.000 30.0 131.692 5.340 -999.990 -999.990 1.317 ..P WKT 2010 10 13 14 09 55 31.3200 -97.3300 251.000 122.0 133.304 5.020 -999.990 -999.990 1.333 ..P WKT 2010 10 13 14 14 55 31.3200 -97.3300 251.000 457.0 122.997 6.150 -999.990 -999.990 1.230 ..P WKT 2010 10 13 14 19 55 31.3200 -97.3300 251.000 30.0 135.417 5.130 -999.990 -999.990 1.354 ..P WKT 2010 10 13 14 24 55 31.3200 -97.3300 251.000 122.0 130.792 4.770 -999.990 -999.990 1.308 ..P WKT 2010 10 13 14 29 55 31.3200 -97.3300 251.000 457.0 123.395 4.250 -999.990 -999.990 1.234 ..P WKT 2010 10 13 14 39 55 31.3200 -97.3300 251.000 30.0 137.981 4.000 -999.990 -999.990 1.380 ..P WKT 2010 10 13 14 44 55 31.3200 -97.3300 251.000 122.0 135.990 4.040 -999.990 -999.990 1.360 ..P WKT 2010 10 13 14 49 55 31.3200 -97.3300 251.000 457.0 128.730 4.450 -999.990 -999.990 1.287 ..P WKT 2010 10 13 14 54 55 31.3200 -97.3300 251.000 30.0 139.905 5.940 -999.990 -999.990 1.399 ..P WKT 2010 10 13 14 59 55 31.3200 -97.3300 251.000 122.0 140.963 4.650 -999.990 -999.990 1.410 ..P WKT 2010 10 13 15 04 55 31.3200 -97.3300 251.000 457.0 120.536 4.010 -999.990 -999.990 1.205 ..P WKT 2010 10 13 15 14 55 31.3200 -97.3300 251.000 30.0 134.708 3.900 -999.990 -999.990 1.347 ..P WKT 2010 10 13 15 19 55 31.3200 -97.3300 251.000 122.0 134.656 4.750 -999.990 -999.990 1.347 ..P WKT 2010 10 13 15 24 55 31.3200 -97.3300 251.000 457.0 134.883 4.820 -999.990 -999.990 1.349 ..P WKT 2010 10 13 15 29 55 31.3200 -97.3300 251.000 30.0 130.534 5.250 -999.990 -999.990 1.305 ..P WKT 2010 10 13 15 34 55 31.3200 -97.3300 251.000 122.0 141.570 5.150 -999.990 -999.990 1.416 ..P WKT 2010 10 13 15 39 55 31.3200 -97.3300 251.000 457.0 125.024 4.080 -999.990 -999.990 1.250 ..P WKT 2010 10 13 15 49 55 31.3200 -97.3300 251.000 30.0 133.098 4.560 -999.990 -999.990 1.331 ..P WKT 2010 10 13 15 54 55 31.3200 -97.3300 251.000 122.0 140.810 4.810 -999.990 -999.990 1.408 ..P WKT 2010 10 13 15 59 55 31.3200 -97.3300 251.000 457.0 130.777 5.220 -999.990 -999.990 1.308 ..P WKT 2010 10 13 16 04 55 31.3200 -97.3300 251.000 30.0 136.270 5.540 -999.990 -999.990 1.363 ..P WKT 2010 10 13 16 09 55 31.3200 -97.3300 251.000 122.0 137.050 4.980 -999.990 -999.990 1.371 ..P WKT 2010 10 13 16 14 55 31.3200 -97.3300 251.000 457.0 141.157 4.070 -999.990 -999.990 1.412 ..P WKT 2010 10 13 16 24 55 31.3200 -97.3300 251.000 30.0 144.420 3.920 -999.990 -999.990 1.444 ..P WKT 2010 10 13 16 29 55 31.3200 -97.3300 251.000 122.0 143.022 4.890 -999.990 -999.990 1.430 ..P WKT 2010 10 13 16 34 55 31.3200 -97.3300 251.000 457.0 141.900 5.470 -999.990 -999.990 1.419 ..P WKT 2010 10 13 16 39 55 31.3200 -97.3300 251.000 30.0 141.056 4.790 -999.990 -999.990 1.411 ..P WKT 2010 10 13 16 44 55 31.3200 -97.3300 251.000 122.0 142.708 4.420 -999.990 -999.990 1.427 ..P WKT 2010 10 13 16 49 55 31.3200 -97.3300 251.000 457.0 138.815 3.960 -999.990 -999.990 1.388 ..P WKT 2010 10 13 17 04 55 31.3200 -97.3300 251.000 30.0 133.519 5.180 -999.990 -999.990 1.335 ..P WKT 2010 10 13 17 09 55 31.3200 -97.3300 251.000 122.0 139.751 3.460 -999.990 -999.990 1.398 ..P WKT 2010 10 13 17 14 55 31.3200 -97.3300 251.000 457.0 134.059 7.230 -999.990 -999.990 1.341 ..P WKT 2010 10 13 17 19 55 31.3200 -97.3300 251.000 30.0 133.913 4.220 -999.990 -999.990 1.339 ..P WKT 2010 10 13 17 24 55 31.3200 -97.3300 251.000 122.0 139.036 3.990 -999.990 -999.990 1.390 ..P WKT 2010 10 13 17 29 55 31.3200 -97.3300 251.000 457.0 135.008 3.230 -999.990 -999.990 1.350 ..P WKT 2010 10 13 17 39 55 31.3200 -97.3300 251.000 30.0 138.593 3.190 -999.990 -999.990 1.386 ..P WKT 2010 10 13 17 44 55 31.3200 -97.3300 251.000 122.0 139.414 4.000 -999.990 -999.990 1.394 ..P WKT 2010 10 13 17 49 55 31.3200 -97.3300 251.000 457.0 144.393 5.010 -999.990 -999.990 1.444 ..P WKT 2010 10 13 17 54 55 31.3200 -97.3300 251.000 30.0 143.133 3.990 -999.990 -999.990 1.431 ..P WKT 2010 10 13 17 59 55 31.3200 -97.3300 251.000 122.0 140.209 3.370 -999.990 -999.990 1.402 ..P WKT 2010 10 13 18 04 55 31.3200 -97.3300 251.000 457.0 138.533 3.560 -999.990 -999.990 1.385 ..P WKT 2010 10 13 18 14 55 31.3200 -97.3300 251.000 30.0 142.431 4.230 -999.990 -999.990 1.424 ..P WKT 2010 10 13 18 19 55 31.3200 -97.3300 251.000 122.0 141.350 3.660 -999.990 -999.990 1.413 ..P WKT 2010 10 13 18 24 55 31.3200 -97.3300 251.000 457.0 138.881 3.620 -999.990 -999.990 1.389 ..P WKT 2010 10 13 18 29 55 31.3200 -97.3300 251.000 30.0 141.405 3.740 -999.990 -999.990 1.414 ..P WKT 2010 10 13 18 34 55 31.3200 -97.3300 251.000 122.0 143.928 4.010 -999.990 -999.990 1.439 ..P WKT 2010 10 13 18 39 55 31.3200 -97.3300 251.000 457.0 143.817 4.650 -999.990 -999.990 1.438 ..P WKT 2010 10 13 18 49 55 31.3200 -97.3300 251.000 30.0 138.523 3.660 -999.990 -999.990 1.385 ..P WKT 2010 10 13 18 54 55 31.3200 -97.3300 251.000 122.0 150.951 3.710 -999.990 -999.990 1.510 ..P WKT 2010 10 13 18 59 55 31.3200 -97.3300 251.000 457.0 143.550 4.080 -999.990 -999.990 1.436 ..P WKT 2010 10 13 19 04 55 31.3200 -97.3300 251.000 30.0 143.360 3.730 -999.990 -999.990 1.434 ..P WKT 2010 10 13 19 09 55 31.3200 -97.3300 251.000 122.0 144.834 3.610 -999.990 -999.990 1.448 ..P WKT 2010 10 13 19 14 55 31.3200 -97.3300 251.000 457.0 140.206 4.390 -999.990 -999.990 1.402 ..P WKT 2010 10 13 19 24 55 31.3200 -97.3300 251.000 30.0 144.143 4.420 -999.990 -999.990 1.441 ..P WKT 2010 10 13 19 29 55 31.3200 -97.3300 251.000 122.0 145.499 3.900 -999.990 -999.990 1.455 ..P WKT 2010 10 13 19 34 55 31.3200 -97.3300 251.000 457.0 136.869 3.540 -999.990 -999.990 1.369 ..P WKT 2010 10 13 19 39 55 31.3200 -97.3300 251.000 30.0 140.719 3.670 -999.990 -999.990 1.407 ..P WKT 2010 10 13 19 44 55 31.3200 -97.3300 251.000 122.0 144.571 3.960 -999.990 -999.990 1.446 ..P WKT 2010 10 13 19 49 55 31.3200 -97.3300 251.000 457.0 143.152 4.420 -999.990 -999.990 1.432 ..P WKT 2010 10 13 19 59 55 31.3200 -97.3300 251.000 30.0 132.687 3.730 -999.990 -999.990 1.327 ..P WKT 2010 10 13 20 04 55 31.3200 -97.3300 251.000 122.0 145.830 4.850 -999.990 -999.990 1.458 ..P WKT 2010 10 13 20 09 55 31.3200 -97.3300 251.000 457.0 144.827 4.220 -999.990 -999.990 1.448 ..P WKT 2010 10 13 20 14 55 31.3200 -97.3300 251.000 30.0 137.445 3.140 -999.990 -999.990 1.374 ..P WKT 2010 10 13 20 19 55 31.3200 -97.3300 251.000 122.0 138.107 3.910 -999.990 -999.990 1.381 ..P WKT 2010 10 13 20 24 55 31.3200 -97.3300 251.000 457.0 138.768 2.920 -999.990 -999.990 1.388 ..P WKT 2010 10 13 20 34 55 31.3200 -97.3300 251.000 30.0 142.746 4.100 -999.990 -999.990 1.427 ..P WKT 2010 10 13 20 39 55 31.3200 -97.3300 251.000 122.0 141.902 3.070 -999.990 -999.990 1.419 ..P WKT 2010 10 13 20 44 55 31.3200 -97.3300 251.000 457.0 141.890 4.380 -999.990 -999.990 1.419 ..P WKT 2010 10 13 20 49 55 31.3200 -97.3300 251.000 30.0 143.265 4.220 -999.990 -999.990 1.433 ..P WKT 2010 10 13 20 54 55 31.3200 -97.3300 251.000 122.0 146.859 4.160 -999.990 -999.990 1.469 ..P WKT 2010 10 13 20 59 55 31.3200 -97.3300 251.000 457.0 141.854 3.290 -999.990 -999.990 1.419 ..P WKT 2010 10 13 21 09 55 31.3200 -97.3300 251.000 30.0 137.292 3.440 -999.990 -999.990 1.373 ..P WKT 2010 10 13 21 14 55 31.3200 -97.3300 251.000 122.0 140.787 3.750 -999.990 -999.990 1.408 ..P WKT 2010 10 13 21 19 55 31.3200 -97.3300 251.000 457.0 140.676 4.440 -999.990 -999.990 1.407 ..P WKT 2010 10 13 21 24 55 31.3200 -97.3300 251.000 30.0 133.630 5.090 -999.990 -999.990 1.336 ..P WKT 2010 10 13 21 29 55 31.3200 -97.3300 251.000 122.0 139.344 4.640 -999.990 -999.990 1.393 ..P WKT 2010 10 13 21 34 55 31.3200 -97.3300 251.000 457.0 137.152 3.610 -999.990 -999.990 1.372 ..P WKT 2010 10 13 21 44 55 31.3200 -97.3300 251.000 30.0 131.838 4.000 -999.990 -999.990 1.318 ..P WKT 2010 10 13 21 49 55 31.3200 -97.3300 251.000 122.0 133.291 4.570 -999.990 -999.990 1.333 ..P WKT 2010 10 13 21 54 55 31.3200 -97.3300 251.000 457.0 136.688 5.170 -999.990 -999.990 1.367 ..P WKT 2010 10 13 21 59 55 31.3200 -97.3300 251.000 30.0 134.535 4.260 -999.990 -999.990 1.345 ..P WKT 2010 10 13 22 04 55 31.3200 -97.3300 251.000 122.0 135.296 3.030 -999.990 -999.990 1.353 ..P WKT 2010 10 13 22 09 55 31.3200 -97.3300 251.000 457.0 131.479 3.180 -999.990 -999.990 1.315 ..P WKT 2010 10 13 22 19 55 31.3200 -97.3300 251.000 30.0 129.176 2.950 -999.990 -999.990 1.292 ..P WKT 2010 10 13 22 24 55 31.3200 -97.3300 251.000 122.0 134.296 3.750 -999.990 -999.990 1.343 ..P WKT 2010 10 13 22 29 55 31.3200 -97.3300 251.000 457.0 131.510 4.460 -999.990 -999.990 1.315 ..P WKT 2010 10 13 22 34 55 31.3200 -97.3300 251.000 30.0 129.695 3.080 -999.990 -999.990 1.297 ..P WKT 2010 10 13 22 39 55 31.3200 -97.3300 251.000 122.0 133.428 3.100 -999.990 -999.990 1.334 ..P WKT 2010 10 13 22 44 55 31.3200 -97.3300 251.000 457.0 130.364 3.210 -999.990 -999.990 1.304 ..P WKT 2010 10 13 22 54 55 31.3200 -97.3300 251.000 30.0 131.667 4.970 -999.990 -999.990 1.317 ..P WKT 2010 10 13 22 59 55 31.3200 -97.3300 251.000 122.0 127.018 3.890 -999.990 -999.990 1.270 ..P WKT 2010 10 13 23 04 55 31.3200 -97.3300 251.000 457.0 133.605 4.390 -999.990 -999.990 1.336 ..P WKT 2010 10 13 23 09 55 31.3200 -97.3300 251.000 30.0 131.453 3.230 -999.990 -999.990 1.315 ..P WKT 2010 10 13 23 14 55 31.3200 -97.3300 251.000 122.0 131.381 3.560 -999.990 -999.990 1.314 ..P WKT 2010 10 13 23 19 55 31.3200 -97.3300 251.000 457.0 133.668 5.290 -999.990 -999.990 1.337 ..P WKT 2010 10 13 23 29 55 31.3200 -97.3300 251.000 30.0 120.758 3.430 -999.990 -999.990 1.208 ..P WKT 2010 10 13 23 34 55 31.3200 -97.3300 251.000 122.0 124.704 3.480 -999.990 -999.990 1.247 ..P WKT 2010 10 13 23 39 55 31.3200 -97.3300 251.000 457.0 127.124 3.120 -999.990 -999.990 1.271 ..P WKT 2010 10 13 23 44 55 31.3200 -97.3300 251.000 30.0 129.822 3.240 -999.990 -999.990 1.298 ..P WKT 2010 10 13 23 49 55 31.3200 -97.3300 251.000 122.0 132.798 2.430 -999.990 -999.990 1.328 ..P WKT 2010 10 14 00 09 55 31.3200 -97.3300 251.000 457.0 119.708 2.170 -999.990 -999.990 1.197 ..P WKT 2010 10 14 00 10 25 31.3200 -97.3300 251.000 457.0 123.315 1.980 -999.990 -999.990 1.233 ..P WKT 2010 10 14 00 10 55 31.3200 -97.3300 251.000 457.0 118.040 1.950 -999.990 -999.990 1.180 ..P WKT 2010 10 14 00 11 25 31.3200 -97.3300 251.000 457.0 119.982 1.720 -999.990 -999.990 1.200 ..P WKT 2010 10 14 00 11 55 31.3200 -97.3300 251.000 457.0 121.090 1.820 -999.990 -999.990 1.211 ..P WKT 2010 10 14 00 12 25 31.3200 -97.3300 251.000 457.0 123.863 1.890 -999.990 -999.990 1.239 ..P WKT 2010 10 14 00 12 55 31.3200 -97.3300 251.000 457.0 124.973 2.020 -999.990 -999.990 1.250 ..P WKT 2010 10 14 00 13 25 31.3200 -97.3300 251.000 457.0 115.258 1.800 -999.990 -999.990 1.153 ..P WKT 2010 10 14 00 13 55 31.3200 -97.3300 251.000 457.0 119.142 1.870 -999.990 -999.990 1.191 ..P WKT 2010 10 14 00 14 25 31.3200 -97.3300 251.000 457.0 120.527 2.010 -999.990 -999.990 1.205 ..P WKT 2010 10 14 00 14 55 31.3200 -97.3300 251.000 457.0 118.861 2.220 -999.990 -999.990 1.189 ..P WKT 2010 10 14 00 19 55 31.3200 -97.3300 251.000 30.0 121.622 2.820 -999.990 -999.990 1.216 ..P WKT 2010 10 14 00 24 55 31.3200 -97.3300 251.000 122.0 124.939 3.480 -999.990 -999.990 1.249 ..P WKT 2010 10 14 00 29 55 31.3200 -97.3300 251.000 457.0 124.369 2.150 -999.990 -999.990 1.244 ..P WKT 2010 10 14 00 34 55 31.3200 -97.3300 251.000 30.0 117.415 2.460 -999.990 -999.990 1.174 ..P WKT 2010 10 14 00 39 55 31.3200 -97.3300 251.000 122.0 120.732 2.550 -999.990 -999.990 1.207 ..P WKT 2010 10 14 00 44 55 31.3200 -97.3300 251.000 457.0 120.162 3.290 -999.990 -999.990 1.202 ..P WKT 2010 10 14 00 54 55 31.3200 -97.3300 251.000 30.0 124.815 2.490 -999.990 -999.990 1.248 ..P WKT 2010 10 14 00 59 55 31.3200 -97.3300 251.000 122.0 119.763 2.420 -999.990 -999.990 1.198 ..P WKT 2010 10 14 01 04 55 31.3200 -97.3300 251.000 457.0 116.653 3.190 -999.990 -999.990 1.167 ..P WKT 2010 10 14 01 09 55 31.3200 -97.3300 251.000 30.0 121.598 2.770 -999.990 -999.990 1.216 ..P WKT 2010 10 14 01 14 55 31.3200 -97.3300 251.000 122.0 123.767 2.320 -999.990 -999.990 1.238 ..P WKT 2010 10 14 01 19 55 31.3200 -97.3300 251.000 457.0 125.657 2.360 -999.990 -999.990 1.257 ..P WKT 2010 10 14 01 29 55 31.3200 -97.3300 251.000 30.0 124.756 2.310 -999.990 -999.990 1.248 ..P WKT 2010 10 14 01 34 55 31.3200 -97.3300 251.000 122.0 123.213 2.880 -999.990 -999.990 1.232 ..P WKT 2010 10 14 01 39 55 31.3200 -97.3300 251.000 457.0 124.728 2.290 -999.990 -999.990 1.247 ..P WKT 2010 10 14 01 44 55 31.3200 -97.3300 251.000 30.0 122.629 2.770 -999.990 -999.990 1.226 ..P WKT 2010 10 14 01 49 55 31.3200 -97.3300 251.000 122.0 128.173 3.780 -999.990 -999.990 1.282 ..P WKT 2010 10 14 01 54 55 31.3200 -97.3300 251.000 457.0 132.050 3.100 -999.990 -999.990 1.321 ..P WKT 2010 10 14 02 04 55 31.3200 -97.3300 251.000 30.0 119.317 2.710 -999.990 -999.990 1.193 ..P WKT 2010 10 14 02 09 55 31.3200 -97.3300 251.000 122.0 126.053 3.000 -999.990 -999.990 1.261 ..P WKT 2010 10 14 02 14 55 31.3200 -97.3300 251.000 457.0 127.648 2.930 -999.990 -999.990 1.276 ..P WKT 2010 10 14 02 19 55 31.3200 -97.3300 251.000 30.0 120.068 3.660 -999.990 -999.990 1.201 ..P WKT 2010 10 14 02 24 55 31.3200 -97.3300 251.000 122.0 126.805 3.830 -999.990 -999.990 1.268 ..P WKT 2010 10 14 02 29 55 31.3200 -97.3300 251.000 457.0 126.314 4.600 -999.990 -999.990 1.263 ..P WKT 2010 10 14 02 39 55 31.3200 -97.3300 251.000 30.0 124.956 3.410 -999.990 -999.990 1.250 ..P WKT 2010 10 14 02 44 55 31.3200 -97.3300 251.000 122.0 123.949 3.810 -999.990 -999.990 1.239 ..P WKT 2010 10 14 02 49 55 31.3200 -97.3300 251.000 457.0 132.119 2.820 -999.990 -999.990 1.321 ..P WKT 2010 10 14 02 54 55 31.3200 -97.3300 251.000 30.0 125.132 2.780 -999.990 -999.990 1.251 ..P WKT 2010 10 14 02 59 55 31.3200 -97.3300 251.000 122.0 129.270 3.860 -999.990 -999.990 1.293 ..P WKT 2010 10 14 03 04 55 31.3200 -97.3300 251.000 457.0 128.820 3.840 -999.990 -999.990 1.288 ..P WKT 2010 10 14 03 14 55 31.3200 -97.3300 251.000 30.0 121.598 3.050 -999.990 -999.990 1.216 ..P WKT 2010 10 14 03 19 55 31.3200 -97.3300 251.000 122.0 126.791 3.410 -999.990 -999.990 1.268 ..P WKT 2010 10 14 03 24 55 31.3200 -97.3300 251.000 457.0 130.871 2.860 -999.990 -999.990 1.309 ..P WKT 2010 10 14 03 29 55 31.3200 -97.3300 251.000 30.0 125.213 4.040 -999.990 -999.990 1.252 ..P WKT 2010 10 14 03 34 55 31.3200 -97.3300 251.000 122.0 129.850 2.680 -999.990 -999.990 1.298 ..P WKT 2010 10 14 03 39 55 31.3200 -97.3300 251.000 457.0 123.495 4.110 -999.990 -999.990 1.235 ..P WKT 2010 10 14 03 49 55 31.3200 -97.3300 251.000 30.0 124.123 2.490 -999.990 -999.990 1.241 ..P WKT 2010 10 14 03 54 55 31.3200 -97.3300 251.000 122.0 130.550 2.810 -999.990 -999.990 1.306 ..P WKT 2010 10 14 03 59 55 31.3200 -97.3300 251.000 457.0 116.379 3.310 -999.990 -999.990 1.164 ..P WKT 2010 10 14 04 04 55 31.3200 -97.3300 251.000 30.0 130.603 3.460 -999.990 -999.990 1.306 ..P WKT 2010 10 14 04 09 55 31.3200 -97.3300 251.000 122.0 126.174 3.360 -999.990 -999.990 1.262 ..P WKT 2010 10 14 04 14 55 31.3200 -97.3300 251.000 457.0 122.302 2.730 -999.990 -999.990 1.223 ..P WKT 2010 10 14 04 24 55 31.3200 -97.3300 251.000 30.0 123.507 2.730 -999.990 -999.990 1.235 ..P WKT 2010 10 14 04 29 55 31.3200 -97.3300 251.000 122.0 127.749 2.730 -999.990 -999.990 1.277 ..P WKT 2010 10 14 04 34 55 31.3200 -97.3300 251.000 457.0 117.511 3.270 -999.990 -999.990 1.175 ..P WKT 2010 10 14 04 39 55 31.3200 -97.3300 251.000 30.0 126.766 3.220 -999.990 -999.990 1.268 ..P WKT 2010 10 14 04 44 55 31.3200 -97.3300 251.000 122.0 134.074 3.440 -999.990 -999.990 1.341 ..P WKT 2010 10 14 04 49 55 31.3200 -97.3300 251.000 457.0 113.806 2.910 -999.990 -999.990 1.138 ..P WKT 2010 10 14 05 04 55 31.3200 -97.3300 251.000 30.0 131.776 3.290 -999.990 -999.990 1.318 ..P WKT 2010 10 14 05 09 55 31.3200 -97.3300 251.000 122.0 132.511 3.250 -999.990 -999.990 1.325 ..P WKT 2010 10 14 05 14 55 31.3200 -97.3300 251.000 457.0 123.495 3.400 -999.990 -999.990 1.235 ..P WKT 2010 10 14 05 19 55 31.3200 -97.3300 251.000 30.0 128.688 3.060 -999.990 -999.990 1.287 ..P WKT 2010 10 14 05 24 55 31.3200 -97.3300 251.000 122.0 131.931 3.080 -999.990 -999.990 1.319 ..P WKT 2010 10 14 05 29 55 31.3200 -97.3300 251.000 457.0 124.584 3.300 -999.990 -999.990 1.246 ..P WKT 2010 10 14 05 39 55 31.3200 -97.3300 251.000 30.0 137.609 3.730 -999.990 -999.990 1.376 ..P WKT 2010 10 14 05 44 55 31.3200 -97.3300 251.000 122.0 132.479 3.410 -999.990 -999.990 1.325 ..P WKT 2010 10 14 05 49 55 31.3200 -97.3300 251.000 457.0 133.063 3.610 -999.990 -999.990 1.331 ..P WKT 2010 10 14 05 54 55 31.3200 -97.3300 251.000 30.0 134.065 3.760 -999.990 -999.990 1.341 ..P WKT 2010 10 14 05 59 55 31.3200 -97.3300 251.000 122.0 124.612 3.930 -999.990 -999.990 1.246 ..P WKT 2010 10 14 06 04 55 31.3200 -97.3300 251.000 457.0 123.522 5.360 -999.990 -999.990 1.235 ..P WKT 2010 10 14 06 14 55 31.3200 -97.3300 251.000 30.0 132.138 4.580 -999.990 -999.990 1.321 ..P WKT 2010 10 14 06 19 55 31.3200 -97.3300 251.000 122.0 135.571 4.400 -999.990 -999.990 1.356 ..P WKT 2010 10 14 06 24 55 31.3200 -97.3300 251.000 457.0 116.554 3.940 -999.990 -999.990 1.166 ..P WKT 2010 10 14 06 29 55 31.3200 -97.3300 251.000 30.0 130.863 3.900 -999.990 -999.990 1.309 ..P WKT 2010 10 14 06 34 55 31.3200 -97.3300 251.000 122.0 134.295 3.800 -999.990 -999.990 1.343 ..P WKT 2010 10 14 06 39 55 31.3200 -97.3300 251.000 457.0 117.227 3.750 -999.990 -999.990 1.172 ..P WKT 2010 10 14 06 49 55 31.3200 -97.3300 251.000 30.0 135.212 3.720 -999.990 -999.990 1.352 ..P WKT 2010 10 14 06 54 55 31.3200 -97.3300 251.000 122.0 136.653 3.770 -999.990 -999.990 1.367 ..P WKT 2010 10 14 06 59 55 31.3200 -97.3300 251.000 457.0 115.634 5.600 -999.990 -999.990 1.156 ..P WKT 2010 10 14 07 04 55 31.3200 -97.3300 251.000 30.0 127.259 4.270 -999.990 -999.990 1.273 ..P WKT 2010 10 14 07 09 55 31.3200 -97.3300 251.000 122.0 131.630 4.090 -999.990 -999.990 1.316 ..P WKT 2010 10 14 07 14 55 31.3200 -97.3300 251.000 457.0 115.351 4.540 -999.990 -999.990 1.154 ..P WKT 2010 10 14 07 24 55 31.3200 -97.3300 251.000 30.0 120.704 6.050 -999.990 -999.990 1.207 ..P WKT 2010 10 14 07 29 55 31.3200 -97.3300 251.000 122.0 126.152 4.580 -999.990 -999.990 1.262 ..P WKT 2010 10 14 07 34 55 31.3200 -97.3300 251.000 457.0 112.480 4.690 -999.990 -999.990 1.125 ..P WKT 2010 10 14 07 39 55 31.3200 -97.3300 251.000 30.0 130.631 4.210 -999.990 -999.990 1.306 ..P WKT 2010 10 14 07 44 55 31.3200 -97.3300 251.000 122.0 126.729 3.520 -999.990 -999.990 1.267 ..P WKT 2010 10 14 07 49 55 31.3200 -97.3300 251.000 457.0 108.029 3.370 -999.990 -999.990 1.080 ..P WKT 2010 10 14 07 59 55 31.3200 -97.3300 251.000 30.0 126.328 4.370 -999.990 -999.990 1.263 ..P WKT 2010 10 14 08 04 55 31.3200 -97.3300 251.000 122.0 122.006 3.530 -999.990 -999.990 1.220 ..P WKT 2010 10 14 08 09 55 31.3200 -97.3300 251.000 457.0 105.115 4.170 -999.990 -999.990 1.051 ..P WKT 2010 10 14 08 14 55 31.3200 -97.3300 251.000 30.0 120.621 3.540 -999.990 -999.990 1.206 ..P WKT 2010 10 14 08 19 55 31.3200 -97.3300 251.000 122.0 121.604 4.750 -999.990 -999.990 1.216 ..P WKT 2010 10 14 08 24 55 31.3200 -97.3300 251.000 457.0 103.593 5.120 -999.990 -999.990 1.036 ..P WKT 2010 10 14 08 34 55 31.3200 -97.3300 251.000 30.0 119.087 4.770 -999.990 -999.990 1.191 ..P WKT 2010 10 14 08 39 55 31.3200 -97.3300 251.000 122.0 124.659 3.820 -999.990 -999.990 1.247 ..P WKT 2010 10 14 08 44 55 31.3200 -97.3300 251.000 457.0 114.588 5.740 -999.990 -999.990 1.146 ..P WKT 2010 10 14 08 49 55 31.3200 -97.3300 251.000 30.0 132.455 3.770 -999.990 -999.990 1.325 ..P WKT 2010 10 14 08 54 55 31.3200 -97.3300 251.000 122.0 131.604 5.960 -999.990 -999.990 1.316 ..P WKT 2010 10 14 08 59 55 31.3200 -97.3300 251.000 457.0 109.793 4.170 -999.990 -999.990 1.098 ..P WKT 2010 10 14 09 09 55 31.3200 -97.3300 251.000 30.0 126.971 3.600 -999.990 -999.990 1.270 ..P WKT 2010 10 14 09 14 55 31.3200 -97.3300 251.000 122.0 132.428 5.320 -999.990 -999.990 1.324 ..P WKT 2010 10 14 09 19 55 31.3200 -97.3300 251.000 457.0 113.567 4.780 -999.990 -999.990 1.136 ..P WKT 2010 10 14 09 24 55 31.3200 -97.3300 251.000 30.0 128.247 4.900 -999.990 -999.990 1.282 ..P WKT 2010 10 14 09 29 55 31.3200 -97.3300 251.000 122.0 131.189 4.390 -999.990 -999.990 1.312 ..P WKT 2010 10 14 09 34 55 31.3200 -97.3300 251.000 457.0 120.152 5.780 -999.990 -999.990 1.202 ..P WKT 2010 10 14 09 44 55 31.3200 -97.3300 251.000 30.0 131.267 4.380 -999.990 -999.990 1.313 ..P WKT 2010 10 14 09 49 55 31.3200 -97.3300 251.000 122.0 134.549 4.600 -999.990 -999.990 1.345 ..P WKT 2010 10 14 09 54 55 31.3200 -97.3300 251.000 457.0 121.613 4.970 -999.990 -999.990 1.216 ..P WKT 2010 10 14 09 59 55 31.3200 -97.3300 251.000 30.0 129.369 6.240 -999.990 -999.990 1.294 ..P WKT 2010 10 14 10 04 55 31.3200 -97.3300 251.000 122.0 128.456 4.880 -999.990 -999.990 1.285 ..P WKT 2010 10 14 10 09 55 31.3200 -97.3300 251.000 457.0 117.754 5.280 -999.990 -999.990 1.178 ..P WKT 2010 10 14 10 19 55 31.3200 -97.3300 251.000 30.0 123.979 5.020 -999.990 -999.990 1.240 ..P WKT 2010 10 14 10 24 55 31.3200 -97.3300 251.000 122.0 124.265 4.580 -999.990 -999.990 1.243 ..P WKT 2010 10 14 10 29 55 31.3200 -97.3300 251.000 457.0 111.961 5.050 -999.990 -999.990 1.120 ..P WKT 2010 10 14 10 34 55 31.3200 -97.3300 251.000 30.0 123.437 4.610 -999.990 -999.990 1.234 ..P WKT 2010 10 14 10 39 55 31.3200 -97.3300 251.000 122.0 128.339 4.390 -999.990 -999.990 1.283 ..P WKT 2010 10 14 10 44 55 31.3200 -97.3300 251.000 457.0 115.334 5.380 -999.990 -999.990 1.153 ..P WKT 2010 10 14 10 54 55 31.3200 -97.3300 251.000 30.0 128.978 3.940 -999.990 -999.990 1.290 ..P WKT 2010 10 14 10 59 55 31.3200 -97.3300 251.000 122.0 127.085 4.750 -999.990 -999.990 1.271 ..P WKT 2010 10 14 11 04 55 31.3200 -97.3300 251.000 457.0 106.020 4.100 -999.990 -999.990 1.060 ..P WKT 2010 10 14 11 09 55 31.3200 -97.3300 251.000 30.0 121.479 4.490 -999.990 -999.990 1.215 ..P WKT 2010 10 14 11 14 55 31.3200 -97.3300 251.000 122.0 126.443 4.040 -999.990 -999.990 1.264 ..P WKT 2010 10 14 11 19 55 31.3200 -97.3300 251.000 457.0 109.014 4.060 -999.990 -999.990 1.090 ..P WKT 2010 10 14 11 29 55 31.3200 -97.3300 251.000 30.0 123.971 4.400 -999.990 -999.990 1.240 ..P WKT 2010 10 14 11 34 55 31.3200 -97.3300 251.000 122.0 125.987 4.600 -999.990 -999.990 1.260 ..P WKT 2010 10 14 11 39 55 31.3200 -97.3300 251.000 457.0 111.484 4.280 -999.990 -999.990 1.115 ..P WKT 2010 10 14 11 44 55 31.3200 -97.3300 251.000 30.0 127.780 4.470 -999.990 -999.990 1.278 ..P WKT 2010 10 14 11 49 55 31.3200 -97.3300 251.000 122.0 126.436 4.550 -999.990 -999.990 1.264 ..P WKT 2010 10 14 12 09 55 31.3200 -97.3300 251.000 457.0 101.300 4.910 -999.990 -999.990 1.013 ..P WKT 2010 10 14 12 10 25 31.3200 -97.3300 251.000 457.0 101.347 4.850 -999.990 -999.990 1.013 ..P WKT 2010 10 14 12 10 55 31.3200 -97.3300 251.000 457.0 103.913 5.040 -999.990 -999.990 1.039 ..P WKT 2010 10 14 12 11 25 31.3200 -97.3300 251.000 457.0 101.161 4.800 -999.990 -999.990 1.012 ..P WKT 2010 10 14 12 11 55 31.3200 -97.3300 251.000 457.0 100.088 4.740 -999.990 -999.990 1.001 ..P WKT 2010 10 14 12 12 25 31.3200 -97.3300 251.000 457.0 101.535 5.240 -999.990 -999.990 1.015 ..P WKT 2010 10 14 12 12 55 31.3200 -97.3300 251.000 457.0 99.623 5.420 -999.990 -999.990 0.996 ..P WKT 2010 10 14 12 13 25 31.3200 -97.3300 251.000 457.0 104.428 5.150 -999.990 -999.990 1.044 ..P WKT 2010 10 14 12 13 55 31.3200 -97.3300 251.000 457.0 101.676 5.080 -999.990 -999.990 1.017 ..P WKT 2010 10 14 12 14 25 31.3200 -97.3300 251.000 457.0 101.444 4.750 -999.990 -999.990 1.014 ..P WKT 2010 10 14 12 14 55 31.3200 -97.3300 251.000 457.0 102.050 4.840 -999.990 -999.990 1.020 ..P WKT 2010 10 14 12 19 55 31.3200 -97.3300 251.000 30.0 124.071 5.030 -999.990 -999.990 1.241 ..P WKT 2010 10 14 12 24 55 31.3200 -97.3300 251.000 122.0 125.657 5.030 -999.990 -999.990 1.257 ..P WKT 2010 10 14 12 29 55 31.3200 -97.3300 251.000 457.0 106.540 5.090 -999.990 -999.990 1.065 ..P WKT 2010 10 14 12 34 55 31.3200 -97.3300 251.000 30.0 137.219 4.660 -999.990 -999.990 1.372 ..P WKT 2010 10 14 12 39 55 31.3200 -97.3300 251.000 122.0 125.098 4.370 -999.990 -999.990 1.251 ..P WKT 2010 10 14 12 44 55 31.3200 -97.3300 251.000 457.0 107.110 4.590 -999.990 -999.990 1.071 ..P WKT 2010 10 14 12 54 55 31.3200 -97.3300 251.000 30.0 135.523 5.230 -999.990 -999.990 1.355 ..P WKT 2010 10 14 12 59 55 31.3200 -97.3300 251.000 122.0 127.685 4.730 -999.990 -999.990 1.277 ..P WKT 2010 10 14 13 04 55 31.3200 -97.3300 251.000 457.0 109.791 4.770 -999.990 -999.990 1.098 ..P WKT 2010 10 14 13 09 55 31.3200 -97.3300 251.000 30.0 132.411 5.270 -999.990 -999.990 1.324 ..P WKT 2010 10 14 13 14 55 31.3200 -97.3300 251.000 122.0 129.048 4.630 -999.990 -999.990 1.290 ..P WKT 2010 10 14 13 19 55 31.3200 -97.3300 251.000 457.0 102.646 4.730 -999.990 -999.990 1.026 ..P WKT 2010 10 14 13 29 55 31.3200 -97.3300 251.000 30.0 128.614 4.900 -999.990 -999.990 1.286 ..P WKT 2010 10 14 13 34 55 31.3200 -97.3300 251.000 122.0 124.576 4.950 -999.990 -999.990 1.246 ..P WKT 2010 10 14 13 39 55 31.3200 -97.3300 251.000 457.0 109.375 5.160 -999.990 -999.990 1.094 ..P WKT 2010 10 14 13 44 55 31.3200 -97.3300 251.000 30.0 131.290 5.330 -999.990 -999.990 1.313 ..P WKT 2010 10 14 13 49 55 31.3200 -97.3300 251.000 122.0 125.998 5.850 -999.990 -999.990 1.260 ..P WKT 2010 10 14 13 54 55 31.3200 -97.3300 251.000 457.0 108.992 6.230 -999.990 -999.990 1.090 ..P WKT 2010 10 14 14 04 55 31.3200 -97.3300 251.000 30.0 127.319 5.830 -999.990 -999.990 1.273 ..P WKT 2010 10 14 14 09 55 31.3200 -97.3300 251.000 122.0 133.082 6.480 -999.990 -999.990 1.331 ..P WKT 2010 10 14 14 14 55 31.3200 -97.3300 251.000 457.0 108.323 5.230 -999.990 -999.990 1.083 ..P WKT 2010 10 14 14 19 55 31.3200 -97.3300 251.000 30.0 130.252 5.540 -999.990 -999.990 1.303 ..P WKT 2010 10 14 14 24 55 31.3200 -97.3300 251.000 122.0 127.931 5.360 -999.990 -999.990 1.279 ..P WKT 2010 10 14 14 29 55 31.3200 -97.3300 251.000 457.0 113.633 4.810 -999.990 -999.990 1.136 ..P WKT 2010 10 14 14 39 55 31.3200 -97.3300 251.000 30.0 128.753 5.030 -999.990 -999.990 1.288 ..P WKT 2010 10 14 14 44 55 31.3200 -97.3300 251.000 122.0 128.781 5.490 -999.990 -999.990 1.288 ..P WKT 2010 10 14 14 49 55 31.3200 -97.3300 251.000 457.0 117.953 5.770 -999.990 -999.990 1.180 ..P WKT 2010 10 14 14 54 55 31.3200 -97.3300 251.000 30.0 125.080 5.190 -999.990 -999.990 1.251 ..P WKT 2010 10 14 14 59 55 31.3200 -97.3300 251.000 122.0 127.335 5.600 -999.990 -999.990 1.273 ..P WKT 2010 10 14 15 04 55 31.3200 -97.3300 251.000 457.0 114.705 5.340 -999.990 -999.990 1.147 ..P WKT 2010 10 14 15 14 55 31.3200 -97.3300 251.000 30.0 119.991 5.690 -999.990 -999.990 1.200 ..P WKT 2010 10 14 15 19 55 31.3200 -97.3300 251.000 122.0 124.272 4.940 -999.990 -999.990 1.243 ..P WKT 2010 10 14 15 24 55 31.3200 -97.3300 251.000 457.0 122.294 5.480 -999.990 -999.990 1.223 ..P WKT 2010 10 14 15 29 55 31.3200 -97.3300 251.000 30.0 131.021 5.370 -999.990 -999.990 1.310 ..P WKT 2010 10 14 15 34 55 31.3200 -97.3300 251.000 122.0 128.627 5.170 -999.990 -999.990 1.286 ..P WKT 2010 10 14 15 39 55 31.3200 -97.3300 251.000 457.0 121.787 4.980 -999.990 -999.990 1.218 ..P WKT 2010 10 14 15 49 55 31.3200 -97.3300 251.000 30.0 128.692 5.300 -999.990 -999.990 1.287 ..P WKT 2010 10 14 15 54 55 31.3200 -97.3300 251.000 122.0 124.376 4.940 -999.990 -999.990 1.244 ..P WKT 2010 10 14 15 59 55 31.3200 -97.3300 251.000 457.0 126.725 5.680 -999.990 -999.990 1.267 ..P WKT 2010 10 14 16 04 55 31.3200 -97.3300 251.000 30.0 124.354 5.260 -999.990 -999.990 1.244 ..P WKT 2010 10 14 16 09 55 31.3200 -97.3300 251.000 122.0 122.540 4.920 -999.990 -999.990 1.225 ..P WKT 2010 10 14 16 14 55 31.3200 -97.3300 251.000 457.0 125.999 5.760 -999.990 -999.990 1.260 ..P WKT 2010 10 14 16 24 55 31.3200 -97.3300 251.000 30.0 128.474 5.120 -999.990 -999.990 1.285 ..P WKT 2010 10 14 16 29 55 31.3200 -97.3300 251.000 122.0 118.061 5.360 -999.990 -999.990 1.181 ..P WKT 2010 10 14 16 34 55 31.3200 -97.3300 251.000 457.0 126.233 5.050 -999.990 -999.990 1.262 ..P WKT 2010 10 14 16 39 55 31.3200 -97.3300 251.000 30.0 118.041 6.380 -999.990 -999.990 1.180 ..P WKT 2010 10 14 16 44 55 31.3200 -97.3300 251.000 122.0 124.547 5.740 -999.990 -999.990 1.245 ..P WKT 2010 10 14 16 49 55 31.3200 -97.3300 251.000 457.0 123.012 5.000 -999.990 -999.990 1.230 ..P WKT 2010 10 14 17 04 55 31.3200 -97.3300 251.000 30.0 116.638 5.300 -999.990 -999.990 1.166 ..P WKT 2010 10 14 17 09 55 31.3200 -97.3300 251.000 122.0 116.575 5.210 -999.990 -999.990 1.166 ..P WKT 2010 10 14 17 14 55 31.3200 -97.3300 251.000 457.0 122.604 5.270 -999.990 -999.990 1.226 ..P WKT 2010 10 14 17 19 55 31.3200 -97.3300 251.000 30.0 122.816 5.190 -999.990 -999.990 1.228 ..P WKT 2010 10 14 17 24 55 31.3200 -97.3300 251.000 122.0 117.353 5.660 -999.990 -999.990 1.174 ..P WKT 2010 10 14 17 29 55 31.3200 -97.3300 251.000 457.0 113.275 5.510 -999.990 -999.990 1.133 ..P WKT 2010 10 14 17 39 55 31.3200 -97.3300 251.000 30.0 113.283 5.130 -999.990 -999.990 1.133 ..P WKT 2010 10 14 17 44 55 31.3200 -97.3300 251.000 122.0 119.578 6.340 -999.990 -999.990 1.196 ..P WKT 2010 10 14 17 49 55 31.3200 -97.3300 251.000 457.0 122.137 5.510 -999.990 -999.990 1.221 ..P WKT 2010 10 14 17 54 55 31.3200 -97.3300 251.000 30.0 119.302 5.700 -999.990 -999.990 1.193 ..P WKT 2010 10 14 17 59 55 31.3200 -97.3300 251.000 122.0 121.306 5.450 -999.990 -999.990 1.213 ..P WKT 2010 10 14 18 04 55 31.3200 -97.3300 251.000 457.0 126.213 5.070 -999.990 -999.990 1.262 ..P WKT 2010 10 14 18 14 55 31.3200 -97.3300 251.000 30.0 122.184 5.000 -999.990 -999.990 1.222 ..P WKT 2010 10 14 18 19 55 31.3200 -97.3300 251.000 122.0 123.477 5.280 -999.990 -999.990 1.235 ..P WKT 2010 10 14 18 24 55 31.3200 -97.3300 251.000 457.0 113.718 5.200 -999.990 -999.990 1.137 ..P WKT 2010 10 14 18 29 55 31.3200 -97.3300 251.000 30.0 116.255 5.820 -999.990 -999.990 1.163 ..P WKT 2010 10 14 18 34 55 31.3200 -97.3300 251.000 122.0 117.685 5.390 -999.990 -999.990 1.177 ..P WKT 2010 10 14 18 39 55 31.3200 -97.3300 251.000 457.0 117.321 5.450 -999.990 -999.990 1.173 ..P WKT 2010 10 14 18 49 55 31.3200 -97.3300 251.000 30.0 123.118 5.470 -999.990 -999.990 1.231 ..P WKT 2010 10 14 18 54 55 31.3200 -97.3300 251.000 122.0 124.724 5.620 -999.990 -999.990 1.247 ..P WKT 2010 10 14 18 59 55 31.3200 -97.3300 251.000 457.0 124.398 5.900 -999.990 -999.990 1.244 ..P WKT 2010 10 14 19 04 55 31.3200 -97.3300 251.000 30.0 119.521 6.150 -999.990 -999.990 1.195 ..P WKT 2010 10 14 19 09 55 31.3200 -97.3300 251.000 122.0 123.608 5.620 -999.990 -999.990 1.236 ..P WKT 2010 10 14 19 14 55 31.3200 -97.3300 251.000 457.0 128.109 5.420 -999.990 -999.990 1.281 ..P WKT 2010 10 14 19 24 55 31.3200 -97.3300 251.000 30.0 128.146 5.020 -999.990 -999.990 1.281 ..P WKT 2010 10 14 19 29 55 31.3200 -97.3300 251.000 122.0 124.099 5.820 -999.990 -999.990 1.241 ..P WKT 2010 10 14 19 34 55 31.3200 -97.3300 251.000 457.0 128.320 6.020 -999.990 -999.990 1.283 ..P WKT 2010 10 14 19 39 55 31.3200 -97.3300 251.000 30.0 120.693 5.960 -999.990 -999.990 1.207 ..P WKT 2010 10 14 19 44 55 31.3200 -97.3300 251.000 122.0 121.057 5.020 -999.990 -999.990 1.211 ..P WKT 2010 10 14 19 49 55 31.3200 -97.3300 251.000 457.0 118.115 5.220 -999.990 -999.990 1.181 ..P WKT 2010 10 14 19 59 55 31.3200 -97.3300 251.000 30.0 110.426 5.240 -999.990 -999.990 1.104 ..P WKT 2010 10 14 20 04 55 31.3200 -97.3300 251.000 122.0 115.039 5.270 -999.990 -999.990 1.150 ..P WKT 2010 10 14 20 09 55 31.3200 -97.3300 251.000 457.0 113.044 5.310 -999.990 -999.990 1.130 ..P WKT 2010 10 14 20 14 55 31.3200 -97.3300 251.000 30.0 119.306 5.780 -999.990 -999.990 1.193 ..P WKT 2010 10 14 20 19 55 31.3200 -97.3300 251.000 122.0 116.487 5.570 -999.990 -999.990 1.165 ..P WKT 2010 10 14 20 24 55 31.3200 -97.3300 251.000 457.0 112.292 5.870 -999.990 -999.990 1.123 ..P WKT 2010 10 14 20 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 10 14 20 39 55 31.3200 -97.3300 251.000 122.0 123.245 5.580 -999.990 -999.990 1.232 ..P WKT 2010 10 14 20 44 55 31.3200 -97.3300 251.000 457.0 117.449 5.460 -999.990 -999.990 1.174 ..P WKT 2010 10 14 20 49 55 31.3200 -97.3300 251.000 30.0 118.283 5.360 -999.990 -999.990 1.183 ..P WKT 2010 10 14 20 54 55 31.3200 -97.3300 251.000 122.0 114.997 5.500 -999.990 -999.990 1.150 ..P WKT 2010 10 14 20 59 55 31.3200 -97.3300 251.000 457.0 110.889 5.330 -999.990 -999.990 1.109 ..P WKT 2010 10 14 21 09 55 31.3200 -97.3300 251.000 30.0 112.912 5.060 -999.990 -999.990 1.129 ..P WKT 2010 10 14 21 14 55 31.3200 -97.3300 251.000 122.0 113.139 5.230 -999.990 -999.990 1.131 ..P WKT 2010 10 14 21 19 55 31.3200 -97.3300 251.000 457.0 111.032 5.030 -999.990 -999.990 1.110 ..P WKT 2010 10 14 21 24 55 31.3200 -97.3300 251.000 30.0 116.199 4.980 -999.990 -999.990 1.162 ..P WKT 2010 10 14 21 29 55 31.3200 -97.3300 251.000 122.0 127.947 5.240 -999.990 -999.990 1.279 ..P WKT 2010 10 14 21 34 55 31.3200 -97.3300 251.000 457.0 122.411 5.390 -999.990 -999.990 1.224 ..P WKT 2010 10 14 21 44 55 31.3200 -97.3300 251.000 30.0 130.440 4.860 -999.990 -999.990 1.304 ..P WKT 2010 10 14 21 49 55 31.3200 -97.3300 251.000 122.0 121.519 4.940 -999.990 -999.990 1.215 ..P WKT 2010 10 14 21 54 55 31.3200 -97.3300 251.000 457.0 118.357 5.690 -999.990 -999.990 1.184 ..P WKT 2010 10 14 21 59 55 31.3200 -97.3300 251.000 30.0 124.925 5.770 -999.990 -999.990 1.249 ..P WKT 2010 10 14 22 04 55 31.3200 -97.3300 251.000 122.0 127.381 5.540 -999.990 -999.990 1.274 ..P WKT 2010 10 14 22 09 55 31.3200 -97.3300 251.000 457.0 122.575 5.310 -999.990 -999.990 1.226 ..P WKT 2010 10 14 22 19 55 31.3200 -97.3300 251.000 30.0 122.046 5.170 -999.990 -999.990 1.220 ..P WKT 2010 10 14 22 24 55 31.3200 -97.3300 251.000 122.0 131.658 5.400 -999.990 -999.990 1.317 ..P WKT 2010 10 14 22 29 55 31.3200 -97.3300 251.000 457.0 121.283 6.130 -999.990 -999.990 1.213 ..P WKT 2010 10 14 22 34 55 31.3200 -97.3300 251.000 30.0 124.597 5.470 -999.990 -999.990 1.246 ..P WKT 2010 10 14 22 39 55 31.3200 -97.3300 251.000 122.0 131.467 6.410 -999.990 -999.990 1.315 ..P WKT 2010 10 14 22 44 55 31.3200 -97.3300 251.000 457.0 129.579 6.070 -999.990 -999.990 1.296 ..P WKT 2010 10 14 22 54 55 31.3200 -97.3300 251.000 30.0 129.205 5.960 -999.990 -999.990 1.292 ..P WKT 2010 10 14 22 59 55 31.3200 -97.3300 251.000 122.0 131.948 6.930 -999.990 -999.990 1.319 ..P WKT 2010 10 14 23 04 55 31.3200 -97.3300 251.000 457.0 131.136 5.660 -999.990 -999.990 1.311 ..P WKT 2010 10 14 23 09 55 31.3200 -97.3300 251.000 30.0 135.654 5.280 -999.990 -999.990 1.357 ..P WKT 2010 10 14 23 14 55 31.3200 -97.3300 251.000 122.0 132.245 5.720 -999.990 -999.990 1.322 ..P WKT 2010 10 14 23 19 55 31.3200 -97.3300 251.000 457.0 138.401 5.520 -999.990 -999.990 1.384 ..P WKT 2010 10 14 23 29 55 31.3200 -97.3300 251.000 30.0 142.508 5.230 -999.990 -999.990 1.425 ..P WKT 2010 10 14 23 34 55 31.3200 -97.3300 251.000 122.0 137.183 5.320 -999.990 -999.990 1.372 ..P WKT 2010 10 14 23 39 55 31.3200 -97.3300 251.000 457.0 133.771 5.140 -999.990 -999.990 1.338 ..P WKT 2010 10 14 23 44 55 31.3200 -97.3300 251.000 30.0 137.732 5.270 -999.990 -999.990 1.377 ..P WKT 2010 10 14 23 49 55 31.3200 -97.3300 251.000 122.0 147.699 5.660 -999.990 -999.990 1.477 ..P WKT 2010 10 15 00 09 55 31.3200 -97.3300 251.000 457.0 145.693 5.630 -999.990 -999.990 1.457 ..P WKT 2010 10 15 00 10 25 31.3200 -97.3300 251.000 457.0 148.666 5.640 -999.990 -999.990 1.487 ..P WKT 2010 10 15 00 10 55 31.3200 -97.3300 251.000 457.0 145.092 6.430 -999.990 -999.990 1.451 ..P WKT 2010 10 15 00 11 25 31.3200 -97.3300 251.000 457.0 141.790 6.320 -999.990 -999.990 1.418 ..P WKT 2010 10 15 00 11 55 31.3200 -97.3300 251.000 457.0 149.129 5.300 -999.990 -999.990 1.491 ..P WKT 2010 10 15 00 12 25 31.3200 -97.3300 251.000 457.0 144.463 5.350 -999.990 -999.990 1.445 ..P WKT 2010 10 15 00 12 55 31.3200 -97.3300 251.000 457.0 147.164 5.440 -999.990 -999.990 1.472 ..P WKT 2010 10 15 00 13 25 31.3200 -97.3300 251.000 457.0 144.407 5.510 -999.990 -999.990 1.444 ..P WKT 2010 10 15 00 13 55 31.3200 -97.3300 251.000 457.0 139.468 5.340 -999.990 -999.990 1.395 ..P WKT 2010 10 15 00 14 25 31.3200 -97.3300 251.000 457.0 144.352 5.520 -999.990 -999.990 1.444 ..P WKT 2010 10 15 00 14 55 31.3200 -97.3300 251.000 457.0 144.598 5.680 -999.990 -999.990 1.446 ..P WKT 2010 10 15 00 19 55 31.3200 -97.3300 251.000 30.0 142.684 5.320 -999.990 -999.990 1.427 ..P WKT 2010 10 15 00 24 55 31.3200 -97.3300 251.000 122.0 142.408 5.490 -999.990 -999.990 1.424 ..P WKT 2010 10 15 00 29 55 31.3200 -97.3300 251.000 457.0 143.495 5.300 -999.990 -999.990 1.435 ..P WKT 2010 10 15 00 34 55 31.3200 -97.3300 251.000 30.0 143.765 5.590 -999.990 -999.990 1.438 ..P WKT 2010 10 15 00 39 55 31.3200 -97.3300 251.000 122.0 141.579 5.650 -999.990 -999.990 1.416 ..P WKT 2010 10 15 00 44 55 31.3200 -97.3300 251.000 457.0 145.395 5.590 -999.990 -999.990 1.454 ..P WKT 2010 10 15 00 54 55 31.3200 -97.3300 251.000 30.0 144.219 5.800 -999.990 -999.990 1.442 ..P WKT 2010 10 15 00 59 55 31.3200 -97.3300 251.000 122.0 138.136 6.090 -999.990 -999.990 1.381 ..P WKT 2010 10 15 01 04 55 31.3200 -97.3300 251.000 457.0 133.146 5.720 -999.990 -999.990 1.331 ..P WKT 2010 10 15 01 09 55 31.3200 -97.3300 251.000 30.0 133.338 5.820 -999.990 -999.990 1.333 ..P WKT 2010 10 15 01 14 55 31.3200 -97.3300 251.000 122.0 128.620 6.000 -999.990 -999.990 1.286 ..P WKT 2010 10 15 01 19 55 31.3200 -97.3300 251.000 457.0 125.949 6.300 -999.990 -999.990 1.259 ..P WKT 2010 10 15 01 29 55 31.3200 -97.3300 251.000 30.0 126.372 5.830 -999.990 -999.990 1.264 ..P WKT 2010 10 15 01 34 55 31.3200 -97.3300 251.000 122.0 126.740 5.780 -999.990 -999.990 1.267 ..P WKT 2010 10 15 01 39 55 31.3200 -97.3300 251.000 457.0 130.242 6.470 -999.990 -999.990 1.302 ..P WKT 2010 10 15 01 44 55 31.3200 -97.3300 251.000 30.0 133.336 5.960 -999.990 -999.990 1.333 ..P WKT 2010 10 15 01 49 55 31.3200 -97.3300 251.000 122.0 130.976 6.440 -999.990 -999.990 1.310 ..P WKT 2010 10 15 01 54 55 31.3200 -97.3300 251.000 457.0 129.571 5.400 -999.990 -999.990 1.296 ..P WKT 2010 10 15 02 04 55 31.3200 -97.3300 251.000 30.0 130.110 5.840 -999.990 -999.990 1.301 ..P WKT 2010 10 15 02 09 55 31.3200 -97.3300 251.000 122.0 128.374 5.530 -999.990 -999.990 1.284 ..P WKT 2010 10 15 02 14 55 31.3200 -97.3300 251.000 457.0 126.912 5.770 -999.990 -999.990 1.269 ..P WKT 2010 10 15 02 19 55 31.3200 -97.3300 251.000 30.0 128.992 5.490 -999.990 -999.990 1.290 ..P WKT 2010 10 15 02 24 55 31.3200 -97.3300 251.000 122.0 129.709 5.900 -999.990 -999.990 1.297 ..P WKT 2010 10 15 02 29 55 31.3200 -97.3300 251.000 457.0 132.744 5.490 -999.990 -999.990 1.327 ..P WKT 2010 10 15 02 39 55 31.3200 -97.3300 251.000 30.0 133.905 6.760 -999.990 -999.990 1.339 ..P WKT 2010 10 15 02 44 55 31.3200 -97.3300 251.000 122.0 135.713 6.010 -999.990 -999.990 1.357 ..P WKT 2010 10 15 02 49 55 31.3200 -97.3300 251.000 457.0 136.974 5.810 -999.990 -999.990 1.370 ..P WKT 2010 10 15 02 54 55 31.3200 -97.3300 251.000 30.0 137.692 5.730 -999.990 -999.990 1.377 ..P WKT 2010 10 15 02 59 55 31.3200 -97.3300 251.000 122.0 125.193 6.410 -999.990 -999.990 1.252 ..P WKT 2010 10 15 03 04 55 31.3200 -97.3300 251.000 457.0 136.537 6.330 -999.990 -999.990 1.365 ..P WKT 2010 10 15 03 14 55 31.3200 -97.3300 251.000 30.0 125.438 5.160 -999.990 -999.990 1.254 ..P WKT 2010 10 15 03 19 55 31.3200 -97.3300 251.000 122.0 125.474 5.590 -999.990 -999.990 1.255 ..P WKT 2010 10 15 03 24 55 31.3200 -97.3300 251.000 457.0 134.228 5.830 -999.990 -999.990 1.342 ..P WKT 2010 10 15 03 29 55 31.3200 -97.3300 251.000 30.0 130.450 5.340 -999.990 -999.990 1.304 ..P WKT 2010 10 15 03 34 55 31.3200 -97.3300 251.000 122.0 126.128 5.580 -999.990 -999.990 1.261 ..P WKT 2010 10 15 03 39 55 31.3200 -97.3300 251.000 457.0 136.787 5.530 -999.990 -999.990 1.368 ..P WKT 2010 10 15 03 49 55 31.3200 -97.3300 251.000 30.0 131.956 5.900 -999.990 -999.990 1.320 ..P WKT 2010 10 15 03 54 55 31.3200 -97.3300 251.000 122.0 128.178 5.210 -999.990 -999.990 1.282 ..P WKT 2010 10 15 03 59 55 31.3200 -97.3300 251.000 457.0 119.228 5.650 -999.990 -999.990 1.192 ..P WKT 2010 10 15 04 04 55 31.3200 -97.3300 251.000 30.0 124.166 6.090 -999.990 -999.990 1.242 ..P WKT 2010 10 15 04 09 55 31.3200 -97.3300 251.000 122.0 120.117 5.740 -999.990 -999.990 1.201 ..P WKT 2010 10 15 04 14 55 31.3200 -97.3300 251.000 457.0 116.342 5.370 -999.990 -999.990 1.163 ..P WKT 2010 10 15 04 24 55 31.3200 -97.3300 251.000 30.0 116.453 5.650 -999.990 -999.990 1.165 ..P WKT 2010 10 15 04 29 55 31.3200 -97.3300 251.000 122.0 129.325 5.700 -999.990 -999.990 1.293 ..P WKT 2010 10 15 04 34 55 31.3200 -97.3300 251.000 457.0 121.232 5.990 -999.990 -999.990 1.212 ..P WKT 2010 10 15 04 39 55 31.3200 -97.3300 251.000 30.0 122.941 5.800 -999.990 -999.990 1.229 ..P WKT 2010 10 15 04 44 55 31.3200 -97.3300 251.000 122.0 129.822 6.780 -999.990 -999.990 1.298 ..P WKT 2010 10 15 04 49 55 31.3200 -97.3300 251.000 457.0 131.802 5.740 -999.990 -999.990 1.318 ..P WKT 2010 10 15 05 04 55 31.3200 -97.3300 251.000 30.0 133.980 6.150 -999.990 -999.990 1.340 ..P WKT 2010 10 15 05 09 55 31.3200 -97.3300 251.000 122.0 129.317 8.480 -999.990 -999.990 1.293 ..P WKT 2010 10 15 05 14 55 31.3200 -97.3300 251.000 457.0 130.504 6.090 -999.990 -999.990 1.305 ..P WKT 2010 10 15 05 19 55 31.3200 -97.3300 251.000 30.0 128.426 5.380 -999.990 -999.990 1.284 ..P WKT 2010 10 15 05 24 55 31.3200 -97.3300 251.000 122.0 132.607 5.260 -999.990 -999.990 1.326 ..P WKT 2010 10 15 05 29 55 31.3200 -97.3300 251.000 457.0 131.754 5.590 -999.990 -999.990 1.318 ..P WKT 2010 10 15 05 39 55 31.3200 -97.3300 251.000 30.0 127.866 5.170 -999.990 -999.990 1.279 ..P WKT 2010 10 15 05 44 55 31.3200 -97.3300 251.000 122.0 130.273 5.290 -999.990 -999.990 1.303 ..P WKT 2010 10 15 05 49 55 31.3200 -97.3300 251.000 457.0 137.169 6.190 -999.990 -999.990 1.372 ..P WKT 2010 10 15 05 54 55 31.3200 -97.3300 251.000 30.0 128.013 5.130 -999.990 -999.990 1.280 ..P WKT 2010 10 15 05 59 55 31.3200 -97.3300 251.000 122.0 131.508 5.780 -999.990 -999.990 1.315 ..P WKT 2010 10 15 06 04 55 31.3200 -97.3300 251.000 457.0 119.224 6.100 -999.990 -999.990 1.192 ..P WKT 2010 10 15 06 14 55 31.3200 -97.3300 251.000 30.0 125.495 5.850 -999.990 -999.990 1.255 ..P WKT 2010 10 15 06 19 55 31.3200 -97.3300 251.000 122.0 128.271 5.110 -999.990 -999.990 1.283 ..P WKT 2010 10 15 06 24 55 31.3200 -97.3300 251.000 457.0 120.574 6.050 -999.990 -999.990 1.206 ..P WKT 2010 10 15 06 29 55 31.3200 -97.3300 251.000 30.0 118.590 6.540 -999.990 -999.990 1.186 ..P WKT 2010 10 15 06 34 55 31.3200 -97.3300 251.000 122.0 120.685 5.260 -999.990 -999.990 1.207 ..P WKT 2010 10 15 06 39 55 31.3200 -97.3300 251.000 457.0 118.158 5.360 -999.990 -999.990 1.182 ..P WKT 2010 10 15 06 49 55 31.3200 -97.3300 251.000 30.0 129.030 5.340 -999.990 -999.990 1.290 ..P WKT 2010 10 15 06 54 55 31.3200 -97.3300 251.000 122.0 123.531 5.110 -999.990 -999.990 1.235 ..P WKT 2010 10 15 06 59 55 31.3200 -97.3300 251.000 457.0 124.965 5.180 -999.990 -999.990 1.250 ..P WKT 2010 10 15 07 04 55 31.3200 -97.3300 251.000 30.0 139.858 5.810 -999.990 -999.990 1.399 ..P WKT 2010 10 15 07 09 55 31.3200 -97.3300 251.000 122.0 129.737 5.230 -999.990 -999.990 1.297 ..P WKT 2010 10 15 07 14 55 31.3200 -97.3300 251.000 457.0 119.617 4.750 -999.990 -999.990 1.196 ..P WKT 2010 10 15 07 24 55 31.3200 -97.3300 251.000 30.0 135.981 5.660 -999.990 -999.990 1.360 ..P WKT 2010 10 15 07 29 55 31.3200 -97.3300 251.000 122.0 146.425 5.510 -999.990 -999.990 1.464 ..P WKT 2010 10 15 07 34 55 31.3200 -97.3300 251.000 457.0 117.179 5.590 -999.990 -999.990 1.172 ..P WKT 2010 10 15 07 39 55 31.3200 -97.3300 251.000 30.0 130.884 5.160 -999.990 -999.990 1.309 ..P WKT 2010 10 15 07 44 55 31.3200 -97.3300 251.000 122.0 142.958 5.580 -999.990 -999.990 1.430 ..P WKT 2010 10 15 07 49 55 31.3200 -97.3300 251.000 457.0 122.143 6.410 -999.990 -999.990 1.221 ..P WKT 2010 10 15 07 59 55 31.3200 -97.3300 251.000 30.0 131.883 5.500 -999.990 -999.990 1.319 ..P WKT 2010 10 15 08 04 55 31.3200 -97.3300 251.000 122.0 143.410 5.450 -999.990 -999.990 1.434 ..P WKT 2010 10 15 08 09 55 31.3200 -97.3300 251.000 457.0 120.424 5.950 -999.990 -999.990 1.204 ..P WKT 2010 10 15 08 14 55 31.3200 -97.3300 251.000 30.0 131.135 5.280 -999.990 -999.990 1.311 ..P WKT 2010 10 15 08 19 55 31.3200 -97.3300 251.000 122.0 139.945 5.150 -999.990 -999.990 1.399 ..P WKT 2010 10 15 08 24 55 31.3200 -97.3300 251.000 457.0 118.048 5.760 -999.990 -999.990 1.180 ..P WKT 2010 10 15 08 34 55 31.3200 -97.3300 251.000 30.0 144.048 5.320 -999.990 -999.990 1.440 ..P WKT 2010 10 15 08 39 55 31.3200 -97.3300 251.000 122.0 140.591 5.000 -999.990 -999.990 1.406 ..P WKT 2010 10 15 08 44 55 31.3200 -97.3300 251.000 457.0 117.302 4.840 -999.990 -999.990 1.173 ..P WKT 2010 10 15 08 49 55 31.3200 -97.3300 251.000 30.0 138.838 5.280 -999.990 -999.990 1.388 ..P WKT 2010 10 15 08 54 55 31.3200 -97.3300 251.000 122.0 137.825 4.910 -999.990 -999.990 1.378 ..P WKT 2010 10 15 08 59 55 31.3200 -97.3300 251.000 457.0 117.799 5.450 -999.990 -999.990 1.178 ..P WKT 2010 10 15 09 09 55 31.3200 -97.3300 251.000 30.0 143.093 4.920 -999.990 -999.990 1.431 ..P WKT 2010 10 15 09 14 55 31.3200 -97.3300 251.000 122.0 149.840 5.120 -999.990 -999.990 1.498 ..P WKT 2010 10 15 09 19 55 31.3200 -97.3300 251.000 457.0 117.615 5.010 -999.990 -999.990 1.176 ..P WKT 2010 10 15 09 24 55 31.3200 -97.3300 251.000 30.0 134.411 5.020 -999.990 -999.990 1.344 ..P WKT 2010 10 15 09 29 55 31.3200 -97.3300 251.000 122.0 133.555 5.080 -999.990 -999.990 1.336 ..P WKT 2010 10 15 09 34 55 31.3200 -97.3300 251.000 457.0 109.073 6.170 -999.990 -999.990 1.091 ..P WKT 2010 10 15 09 44 55 31.3200 -97.3300 251.000 30.0 136.610 5.270 -999.990 -999.990 1.366 ..P WKT 2010 10 15 09 49 55 31.3200 -97.3300 251.000 122.0 153.868 5.010 -999.990 -999.990 1.539 ..P WKT 2010 10 15 09 54 55 31.3200 -97.3300 251.000 457.0 121.303 5.970 -999.990 -999.990 1.213 ..P WKT 2010 10 15 09 59 55 31.3200 -97.3300 251.000 30.0 142.496 5.390 -999.990 -999.990 1.425 ..P WKT 2010 10 15 10 04 55 31.3200 -97.3300 251.000 122.0 142.376 6.110 -999.990 -999.990 1.424 ..P WKT 2010 10 15 10 09 55 31.3200 -97.3300 251.000 457.0 113.888 5.680 -999.990 -999.990 1.139 ..P WKT 2010 10 15 10 19 55 31.3200 -97.3300 251.000 30.0 129.608 4.820 -999.990 -999.990 1.296 ..P WKT 2010 10 15 10 24 55 31.3200 -97.3300 251.000 122.0 154.809 5.000 -999.990 -999.990 1.548 ..P WKT 2010 10 15 10 29 55 31.3200 -97.3300 251.000 457.0 114.189 5.500 -999.990 -999.990 1.142 ..P WKT 2010 10 15 10 34 55 31.3200 -97.3300 251.000 30.0 134.232 6.530 -999.990 -999.990 1.342 ..P WKT 2010 10 15 10 39 55 31.3200 -97.3300 251.000 122.0 150.746 5.720 -999.990 -999.990 1.507 ..P WKT 2010 10 15 10 44 55 31.3200 -97.3300 251.000 457.0 106.738 5.220 -999.990 -999.990 1.067 ..P WKT 2010 10 15 10 54 55 31.3200 -97.3300 251.000 30.0 133.173 4.890 -999.990 -999.990 1.332 ..P WKT 2010 10 15 10 59 55 31.3200 -97.3300 251.000 122.0 142.822 5.680 -999.990 -999.990 1.428 ..P WKT 2010 10 15 11 04 55 31.3200 -97.3300 251.000 457.0 109.599 6.670 -999.990 -999.990 1.096 ..P WKT 2010 10 15 11 09 55 31.3200 -97.3300 251.000 30.0 132.815 7.030 -999.990 -999.990 1.328 ..P WKT 2010 10 15 11 14 55 31.3200 -97.3300 251.000 122.0 142.192 6.610 -999.990 -999.990 1.422 ..P WKT 2010 10 15 11 19 55 31.3200 -97.3300 251.000 457.0 112.228 5.250 -999.990 -999.990 1.122 ..P WKT 2010 10 15 11 29 55 31.3200 -97.3300 251.000 30.0 142.559 5.050 -999.990 -999.990 1.426 ..P WKT 2010 10 15 11 34 55 31.3200 -97.3300 251.000 122.0 134.486 6.350 -999.990 -999.990 1.345 ..P WKT 2010 10 15 11 39 55 31.3200 -97.3300 251.000 457.0 118.546 6.760 -999.990 -999.990 1.185 ..P WKT 2010 10 15 11 44 55 31.3200 -97.3300 251.000 30.0 142.481 7.310 -999.990 -999.990 1.425 ..P WKT 2010 10 15 11 49 55 31.3200 -97.3300 251.000 122.0 140.647 5.470 -999.990 -999.990 1.406 ..P WKT 2010 10 15 12 09 55 31.3200 -97.3300 251.000 457.0 102.600 5.050 -999.990 -999.990 1.026 ..P WKT 2010 10 15 12 10 25 31.3200 -97.3300 251.000 457.0 102.872 5.150 -999.990 -999.990 1.029 ..P WKT 2010 10 15 12 10 55 31.3200 -97.3300 251.000 457.0 106.941 4.760 -999.990 -999.990 1.069 ..P WKT 2010 10 15 12 11 25 31.3200 -97.3300 251.000 457.0 102.873 4.750 -999.990 -999.990 1.029 ..P WKT 2010 10 15 12 11 55 31.3200 -97.3300 251.000 457.0 109.655 5.380 -999.990 -999.990 1.097 ..P WKT 2010 10 15 12 12 25 31.3200 -97.3300 251.000 457.0 110.469 5.210 -999.990 -999.990 1.105 ..P WKT 2010 10 15 12 12 55 31.3200 -97.3300 251.000 457.0 103.690 5.110 -999.990 -999.990 1.037 ..P WKT 2010 10 15 12 13 25 31.3200 -97.3300 251.000 457.0 107.217 4.950 -999.990 -999.990 1.072 ..P WKT 2010 10 15 12 13 55 31.3200 -97.3300 251.000 457.0 99.895 4.930 -999.990 -999.990 0.999 ..P WKT 2010 10 15 12 14 25 31.3200 -97.3300 251.000 457.0 99.896 4.800 -999.990 -999.990 0.999 ..P WKT 2010 10 15 12 14 55 31.3200 -97.3300 251.000 457.0 108.847 5.300 -999.990 -999.990 1.088 ..P WKT 2010 10 15 12 19 55 31.3200 -97.3300 251.000 30.0 144.924 5.140 -999.990 -999.990 1.449 ..P WKT 2010 10 15 12 24 55 31.3200 -97.3300 251.000 122.0 143.034 5.740 -999.990 -999.990 1.430 ..P WKT 2010 10 15 12 29 55 31.3200 -97.3300 251.000 457.0 107.788 5.320 -999.990 -999.990 1.078 ..P WKT 2010 10 15 12 34 55 31.3200 -97.3300 251.000 30.0 136.813 4.910 -999.990 -999.990 1.368 ..P WKT 2010 10 15 12 39 55 31.3200 -97.3300 251.000 122.0 148.211 5.920 -999.990 -999.990 1.482 ..P WKT 2010 10 15 12 44 55 31.3200 -97.3300 251.000 457.0 102.663 5.360 -999.990 -999.990 1.027 ..P WKT 2010 10 15 12 54 55 31.3200 -97.3300 251.000 30.0 145.856 7.020 -999.990 -999.990 1.459 ..P WKT 2010 10 15 12 59 55 31.3200 -97.3300 251.000 122.0 142.402 5.240 -999.990 -999.990 1.424 ..P WKT 2010 10 15 13 04 55 31.3200 -97.3300 251.000 457.0 112.241 5.190 -999.990 -999.990 1.122 ..P WKT 2010 10 15 13 09 55 31.3200 -97.3300 251.000 30.0 135.765 5.050 -999.990 -999.990 1.358 ..P WKT 2010 10 15 13 14 55 31.3200 -97.3300 251.000 122.0 139.766 5.020 -999.990 -999.990 1.398 ..P WKT 2010 10 15 13 19 55 31.3200 -97.3300 251.000 457.0 109.471 4.740 -999.990 -999.990 1.095 ..P WKT 2010 10 15 13 29 55 31.3200 -97.3300 251.000 30.0 136.880 4.910 -999.990 -999.990 1.369 ..P WKT 2010 10 15 13 34 55 31.3200 -97.3300 251.000 122.0 146.730 5.250 -999.990 -999.990 1.467 ..P WKT 2010 10 15 13 39 55 31.3200 -97.3300 251.000 457.0 109.409 4.920 -999.990 -999.990 1.094 ..P WKT 2010 10 15 13 44 55 31.3200 -97.3300 251.000 30.0 145.961 4.980 -999.990 -999.990 1.460 ..P WKT 2010 10 15 13 49 55 31.3200 -97.3300 251.000 122.0 153.777 4.890 -999.990 -999.990 1.538 ..P WKT 2010 10 15 13 54 55 31.3200 -97.3300 251.000 457.0 109.138 5.110 -999.990 -999.990 1.091 ..P WKT 2010 10 15 14 04 55 31.3200 -97.3300 251.000 30.0 140.996 5.230 -999.990 -999.990 1.410 ..P WKT 2010 10 15 14 09 55 31.3200 -97.3300 251.000 122.0 145.112 5.130 -999.990 -999.990 1.451 ..P WKT 2010 10 15 14 14 55 31.3200 -97.3300 251.000 457.0 113.586 5.010 -999.990 -999.990 1.136 ..P WKT 2010 10 15 14 19 55 31.3200 -97.3300 251.000 30.0 142.776 4.990 -999.990 -999.990 1.428 ..P WKT 2010 10 15 14 24 55 31.3200 -97.3300 251.000 122.0 147.570 6.120 -999.990 -999.990 1.476 ..P WKT 2010 10 15 14 29 55 31.3200 -97.3300 251.000 457.0 115.232 5.130 -999.990 -999.990 1.152 ..P WKT 2010 10 15 14 39 55 31.3200 -97.3300 251.000 30.0 137.114 4.790 -999.990 -999.990 1.371 ..P WKT 2010 10 15 14 44 55 31.3200 -97.3300 251.000 122.0 143.495 4.860 -999.990 -999.990 1.435 ..P WKT 2010 10 15 14 49 55 31.3200 -97.3300 251.000 457.0 112.071 4.850 -999.990 -999.990 1.121 ..P WKT 2010 10 15 14 54 55 31.3200 -97.3300 251.000 30.0 144.198 4.810 -999.990 -999.990 1.442 ..P WKT 2010 10 15 14 59 55 31.3200 -97.3300 251.000 122.0 134.047 5.050 -999.990 -999.990 1.340 ..P WKT 2010 10 15 15 04 55 31.3200 -97.3300 251.000 457.0 112.245 4.800 -999.990 -999.990 1.122 ..P WKT 2010 10 15 15 14 55 31.3200 -97.3300 251.000 30.0 133.021 5.730 -999.990 -999.990 1.330 ..P WKT 2010 10 15 15 19 55 31.3200 -97.3300 251.000 122.0 133.865 5.150 -999.990 -999.990 1.339 ..P WKT 2010 10 15 15 24 55 31.3200 -97.3300 251.000 457.0 107.072 5.200 -999.990 -999.990 1.071 ..P WKT 2010 10 15 15 29 55 31.3200 -97.3300 251.000 30.0 125.801 5.440 -999.990 -999.990 1.258 ..P WKT 2010 10 15 15 34 55 31.3200 -97.3300 251.000 122.0 131.794 5.610 -999.990 -999.990 1.318 ..P WKT 2010 10 15 15 39 55 31.3200 -97.3300 251.000 457.0 109.879 6.000 -999.990 -999.990 1.099 ..P WKT 2010 10 15 15 49 55 31.3200 -97.3300 251.000 30.0 134.986 6.090 -999.990 -999.990 1.350 ..P WKT 2010 10 15 15 54 55 31.3200 -97.3300 251.000 122.0 136.218 5.770 -999.990 -999.990 1.362 ..P WKT 2010 10 15 15 59 55 31.3200 -97.3300 251.000 457.0 113.067 5.840 -999.990 -999.990 1.131 ..P WKT 2010 10 15 16 04 55 31.3200 -97.3300 251.000 30.0 127.303 7.340 -999.990 -999.990 1.273 ..P WKT 2010 10 15 16 09 55 31.3200 -97.3300 251.000 122.0 125.826 5.350 -999.990 -999.990 1.258 ..P WKT 2010 10 15 16 14 55 31.3200 -97.3300 251.000 457.0 106.198 5.080 -999.990 -999.990 1.062 ..P WKT 2010 10 15 16 24 55 31.3200 -97.3300 251.000 30.0 120.350 5.480 -999.990 -999.990 1.204 ..P WKT 2010 10 15 16 29 55 31.3200 -97.3300 251.000 122.0 127.309 5.250 -999.990 -999.990 1.273 ..P WKT 2010 10 15 16 34 55 31.3200 -97.3300 251.000 457.0 110.159 7.980 -999.990 -999.990 1.102 ..P WKT 2010 10 15 16 39 55 31.3200 -97.3300 251.000 30.0 122.807 5.200 -999.990 -999.990 1.228 ..P WKT 2010 10 15 16 44 55 31.3200 -97.3300 251.000 122.0 115.680 5.170 -999.990 -999.990 1.157 ..P WKT 2010 10 15 16 49 55 31.3200 -97.3300 251.000 457.0 106.658 5.040 -999.990 -999.990 1.067 ..P WKT 2010 10 15 17 04 55 31.3200 -97.3300 251.000 30.0 118.344 5.420 -999.990 -999.990 1.183 ..P WKT 2010 10 15 17 09 55 31.3200 -97.3300 251.000 122.0 119.759 5.210 -999.990 -999.990 1.198 ..P WKT 2010 10 15 17 14 55 31.3200 -97.3300 251.000 457.0 118.331 5.300 -999.990 -999.990 1.183 ..P WKT 2010 10 15 17 19 55 31.3200 -97.3300 251.000 30.0 114.059 5.560 -999.990 -999.990 1.141 ..P WKT 2010 10 15 17 24 55 31.3200 -97.3300 251.000 122.0 121.162 5.070 -999.990 -999.990 1.212 ..P WKT 2010 10 15 17 29 55 31.3200 -97.3300 251.000 457.0 120.546 5.070 -999.990 -999.990 1.205 ..P WKT 2010 10 15 17 39 55 31.3200 -97.3300 251.000 30.0 117.255 4.820 -999.990 -999.990 1.173 ..P WKT 2010 10 15 17 44 55 31.3200 -97.3300 251.000 122.0 124.463 4.980 -999.990 -999.990 1.245 ..P WKT 2010 10 15 17 49 55 31.3200 -97.3300 251.000 457.0 124.631 5.240 -999.990 -999.990 1.246 ..P WKT 2010 10 15 17 54 55 31.3200 -97.3300 251.000 30.0 121.820 6.110 -999.990 -999.990 1.218 ..P WKT 2010 10 15 17 59 55 31.3200 -97.3300 251.000 122.0 126.997 4.940 -999.990 -999.990 1.270 ..P WKT 2010 10 15 18 04 55 31.3200 -97.3300 251.000 457.0 124.592 5.010 -999.990 -999.990 1.246 ..P WKT 2010 10 15 18 14 55 31.3200 -97.3300 251.000 30.0 120.788 4.830 -999.990 -999.990 1.208 ..P WKT 2010 10 15 18 19 55 31.3200 -97.3300 251.000 122.0 118.577 4.790 -999.990 -999.990 1.186 ..P WKT 2010 10 15 18 24 55 31.3200 -97.3300 251.000 457.0 116.095 5.190 -999.990 -999.990 1.161 ..P WKT 2010 10 15 18 29 55 31.3200 -97.3300 251.000 30.0 114.020 5.150 -999.990 -999.990 1.140 ..P WKT 2010 10 15 18 34 55 31.3200 -97.3300 251.000 122.0 120.608 5.180 -999.990 -999.990 1.206 ..P WKT 2010 10 15 18 39 55 31.3200 -97.3300 251.000 457.0 121.510 5.420 -999.990 -999.990 1.215 ..P WKT 2010 10 15 18 49 55 31.3200 -97.3300 251.000 30.0 116.992 4.760 -999.990 -999.990 1.170 ..P WKT 2010 10 15 18 54 55 31.3200 -97.3300 251.000 122.0 120.234 6.940 -999.990 -999.990 1.202 ..P WKT 2010 10 15 18 59 55 31.3200 -97.3300 251.000 457.0 113.189 5.220 -999.990 -999.990 1.132 ..P WKT 2010 10 15 19 04 55 31.3200 -97.3300 251.000 30.0 122.928 5.400 -999.990 -999.990 1.229 ..P WKT 2010 10 15 19 09 55 31.3200 -97.3300 251.000 122.0 116.696 5.330 -999.990 -999.990 1.167 ..P WKT 2010 10 15 19 14 55 31.3200 -97.3300 251.000 457.0 115.336 5.630 -999.990 -999.990 1.153 ..P WKT 2010 10 15 19 24 55 31.3200 -97.3300 251.000 30.0 113.274 5.740 -999.990 -999.990 1.133 ..P WKT 2010 10 15 19 29 55 31.3200 -97.3300 251.000 122.0 116.361 5.410 -999.990 -999.990 1.164 ..P WKT 2010 10 15 19 34 55 31.3200 -97.3300 251.000 457.0 119.719 5.470 -999.990 -999.990 1.197 ..P WKT 2010 10 15 19 39 55 31.3200 -97.3300 251.000 30.0 113.603 5.950 -999.990 -999.990 1.136 ..P WKT 2010 10 15 19 44 55 31.3200 -97.3300 251.000 122.0 122.373 5.730 -999.990 -999.990 1.224 ..P WKT 2010 10 15 19 49 55 31.3200 -97.3300 251.000 457.0 117.070 6.010 -999.990 -999.990 1.171 ..P WKT 2010 10 15 19 59 55 31.3200 -97.3300 251.000 30.0 107.817 5.050 -999.990 -999.990 1.078 ..P WKT 2010 10 15 20 04 55 31.3200 -97.3300 251.000 122.0 111.715 5.610 -999.990 -999.990 1.117 ..P WKT 2010 10 15 20 09 55 31.3200 -97.3300 251.000 457.0 117.509 5.710 -999.990 -999.990 1.175 ..P WKT 2010 10 15 20 14 55 31.3200 -97.3300 251.000 30.0 118.430 5.220 -999.990 -999.990 1.184 ..P WKT 2010 10 15 20 19 55 31.3200 -97.3300 251.000 122.0 119.893 5.380 -999.990 -999.990 1.199 ..P WKT 2010 10 15 20 24 55 31.3200 -97.3300 251.000 457.0 115.402 5.740 -999.990 -999.990 1.154 ..P WKT 2010 10 15 20 34 55 31.3200 -97.3300 251.000 30.0 110.403 5.800 -999.990 -999.990 1.104 ..P WKT 2010 10 15 20 39 55 31.3200 -97.3300 251.000 122.0 118.553 5.870 -999.990 -999.990 1.186 ..P WKT 2010 10 15 20 44 55 31.3200 -97.3300 251.000 457.0 124.267 6.120 -999.990 -999.990 1.243 ..P WKT 2010 10 15 20 49 55 31.3200 -97.3300 251.000 30.0 124.029 6.780 -999.990 -999.990 1.240 ..P WKT 2010 10 15 20 54 55 31.3200 -97.3300 251.000 122.0 124.737 6.700 -999.990 -999.990 1.247 ..P WKT 2010 10 15 20 59 55 31.3200 -97.3300 251.000 457.0 128.828 5.500 -999.990 -999.990 1.288 ..P WKT 2010 10 15 21 09 55 31.3200 -97.3300 251.000 30.0 126.090 5.500 -999.990 -999.990 1.261 ..P WKT 2010 10 15 21 14 55 31.3200 -97.3300 251.000 122.0 127.378 6.320 -999.990 -999.990 1.274 ..P WKT 2010 10 15 21 19 55 31.3200 -97.3300 251.000 457.0 124.878 7.850 -999.990 -999.990 1.249 ..P WKT 2010 10 15 21 24 55 31.3200 -97.3300 251.000 30.0 125.761 6.310 -999.990 -999.990 1.258 ..P WKT 2010 10 15 21 29 55 31.3200 -97.3300 251.000 122.0 120.962 5.490 -999.990 -999.990 1.210 ..P WKT 2010 10 15 21 34 55 31.3200 -97.3300 251.000 457.0 120.762 5.140 -999.990 -999.990 1.208 ..P WKT 2010 10 15 21 44 55 31.3200 -97.3300 251.000 30.0 125.464 5.400 -999.990 -999.990 1.255 ..P WKT 2010 10 15 21 49 55 31.3200 -97.3300 251.000 122.0 127.795 5.790 -999.990 -999.990 1.278 ..P WKT 2010 10 15 21 54 55 31.3200 -97.3300 251.000 457.0 124.041 5.720 -999.990 -999.990 1.240 ..P WKT 2010 10 15 21 59 55 31.3200 -97.3300 251.000 30.0 123.126 5.330 -999.990 -999.990 1.231 ..P WKT 2010 10 15 22 04 55 31.3200 -97.3300 251.000 122.0 122.617 5.200 -999.990 -999.990 1.226 ..P WKT 2010 10 15 22 09 55 31.3200 -97.3300 251.000 457.0 131.440 5.430 -999.990 -999.990 1.314 ..P WKT 2010 10 15 22 19 55 31.3200 -97.3300 251.000 30.0 131.446 5.260 -999.990 -999.990 1.314 ..P WKT 2010 10 15 22 24 55 31.3200 -97.3300 251.000 122.0 127.498 4.950 -999.990 -999.990 1.275 ..P WKT 2010 10 15 22 29 55 31.3200 -97.3300 251.000 457.0 130.988 5.340 -999.990 -999.990 1.310 ..P WKT 2010 10 15 22 34 55 31.3200 -97.3300 251.000 30.0 128.258 5.640 -999.990 -999.990 1.283 ..P WKT 2010 10 15 22 39 55 31.3200 -97.3300 251.000 122.0 128.232 5.650 -999.990 -999.990 1.282 ..P WKT 2010 10 15 22 44 55 31.3200 -97.3300 251.000 457.0 134.967 5.560 -999.990 -999.990 1.350 ..P WKT 2010 10 15 22 54 55 31.3200 -97.3300 251.000 30.0 133.562 5.720 -999.990 -999.990 1.336 ..P WKT 2010 10 15 22 59 55 31.3200 -97.3300 251.000 122.0 131.779 5.250 -999.990 -999.990 1.318 ..P WKT 2010 10 15 23 04 55 31.3200 -97.3300 251.000 457.0 131.888 5.520 -999.990 -999.990 1.319 ..P WKT 2010 10 15 23 09 55 31.3200 -97.3300 251.000 30.0 126.049 5.280 -999.990 -999.990 1.260 ..P WKT 2010 10 15 23 14 55 31.3200 -97.3300 251.000 122.0 124.265 5.460 -999.990 -999.990 1.243 ..P WKT 2010 10 15 23 19 55 31.3200 -97.3300 251.000 457.0 131.405 5.210 -999.990 -999.990 1.314 ..P WKT 2010 10 15 23 29 55 31.3200 -97.3300 251.000 30.0 135.867 5.660 -999.990 -999.990 1.359 ..P WKT 2010 10 15 23 34 55 31.3200 -97.3300 251.000 122.0 128.865 5.170 -999.990 -999.990 1.289 ..P WKT 2010 10 15 23 39 55 31.3200 -97.3300 251.000 457.0 127.540 6.170 -999.990 -999.990 1.275 ..P WKT 2010 10 15 23 44 55 31.3200 -97.3300 251.000 30.0 134.597 5.300 -999.990 -999.990 1.346 ..P WKT 2010 10 15 23 49 55 31.3200 -97.3300 251.000 122.0 128.675 5.140 -999.990 -999.990 1.287 ..P WKT 2010 10 16 00 09 55 31.3200 -97.3300 251.000 457.0 125.668 5.040 -999.990 -999.990 1.257 ..P WKT 2010 10 16 00 10 25 31.3200 -97.3300 251.000 457.0 124.030 5.300 -999.990 -999.990 1.240 ..P WKT 2010 10 16 00 10 55 31.3200 -97.3300 251.000 457.0 124.825 5.710 -999.990 -999.990 1.248 ..P WKT 2010 10 16 00 11 25 31.3200 -97.3300 251.000 457.0 123.187 5.720 -999.990 -999.990 1.232 ..P WKT 2010 10 16 00 11 55 31.3200 -97.3300 251.000 457.0 127.227 5.780 -999.990 -999.990 1.272 ..P WKT 2010 10 16 00 12 25 31.3200 -97.3300 251.000 457.0 123.155 5.740 -999.990 -999.990 1.232 ..P WKT 2010 10 16 00 12 55 31.3200 -97.3300 251.000 457.0 126.113 5.360 -999.990 -999.990 1.261 ..P WKT 2010 10 16 00 13 25 31.3200 -97.3300 251.000 457.0 123.934 5.200 -999.990 -999.990 1.239 ..P WKT 2010 10 16 00 13 55 31.3200 -97.3300 251.000 457.0 123.377 5.160 -999.990 -999.990 1.234 ..P WKT 2010 10 16 00 14 25 31.3200 -97.3300 251.000 457.0 127.147 5.320 -999.990 -999.990 1.271 ..P WKT 2010 10 16 00 14 55 31.3200 -97.3300 251.000 457.0 124.968 5.440 -999.990 -999.990 1.250 ..P WKT 2010 10 16 00 19 55 31.3200 -97.3300 251.000 30.0 125.890 5.970 -999.990 -999.990 1.259 ..P WKT 2010 10 16 00 24 55 31.3200 -97.3300 251.000 122.0 120.051 5.710 -999.990 -999.990 1.201 ..P WKT 2010 10 16 00 29 55 31.3200 -97.3300 251.000 457.0 125.030 5.870 -999.990 -999.990 1.250 ..P WKT 2010 10 16 00 34 55 31.3200 -97.3300 251.000 30.0 121.084 6.750 -999.990 -999.990 1.211 ..P WKT 2010 10 16 00 39 55 31.3200 -97.3300 251.000 122.0 124.170 7.060 -999.990 -999.990 1.242 ..P WKT 2010 10 16 00 44 55 31.3200 -97.3300 251.000 457.0 139.699 6.510 -999.990 -999.990 1.397 ..P WKT 2010 10 16 00 54 55 31.3200 -97.3300 251.000 30.0 120.894 6.400 -999.990 -999.990 1.209 ..P WKT 2010 10 16 00 59 55 31.3200 -97.3300 251.000 122.0 128.626 6.090 -999.990 -999.990 1.286 ..P WKT 2010 10 16 01 04 55 31.3200 -97.3300 251.000 457.0 143.394 6.060 -999.990 -999.990 1.434 ..P WKT 2010 10 16 01 09 55 31.3200 -97.3300 251.000 30.0 125.692 6.260 -999.990 -999.990 1.257 ..P WKT 2010 10 16 01 14 55 31.3200 -97.3300 251.000 122.0 134.237 5.780 -999.990 -999.990 1.342 ..P WKT 2010 10 16 01 19 55 31.3200 -97.3300 251.000 457.0 154.827 6.340 -999.990 -999.990 1.548 ..P WKT 2010 10 16 01 29 55 31.3200 -97.3300 251.000 30.0 127.244 5.230 -999.990 -999.990 1.272 ..P WKT 2010 10 16 01 34 55 31.3200 -97.3300 251.000 122.0 128.599 5.570 -999.990 -999.990 1.286 ..P WKT 2010 10 16 01 39 55 31.3200 -97.3300 251.000 457.0 142.543 5.780 -999.990 -999.990 1.425 ..P WKT 2010 10 16 01 44 55 31.3200 -97.3300 251.000 30.0 127.655 5.570 -999.990 -999.990 1.277 ..P WKT 2010 10 16 01 49 55 31.3200 -97.3300 251.000 122.0 127.927 5.460 -999.990 -999.990 1.279 ..P WKT 2010 10 16 01 54 55 31.3200 -97.3300 251.000 457.0 142.822 5.780 -999.990 -999.990 1.428 ..P WKT 2010 10 16 02 04 55 31.3200 -97.3300 251.000 30.0 125.998 5.160 -999.990 -999.990 1.260 ..P WKT 2010 10 16 02 09 55 31.3200 -97.3300 251.000 122.0 130.023 5.230 -999.990 -999.990 1.300 ..P WKT 2010 10 16 02 14 55 31.3200 -97.3300 251.000 457.0 142.716 5.240 -999.990 -999.990 1.427 ..P WKT 2010 10 16 02 19 55 31.3200 -97.3300 251.000 30.0 129.679 5.140 -999.990 -999.990 1.297 ..P WKT 2010 10 16 02 24 55 31.3200 -97.3300 251.000 122.0 133.027 4.960 -999.990 -999.990 1.330 ..P WKT 2010 10 16 02 29 55 31.3200 -97.3300 251.000 457.0 133.126 4.970 -999.990 -999.990 1.331 ..P WKT 2010 10 16 02 39 55 31.3200 -97.3300 251.000 30.0 122.254 5.120 -999.990 -999.990 1.223 ..P WKT 2010 10 16 02 44 55 31.3200 -97.3300 251.000 122.0 131.467 4.710 -999.990 -999.990 1.315 ..P WKT 2010 10 16 02 49 55 31.3200 -97.3300 251.000 457.0 134.992 5.650 -999.990 -999.990 1.350 ..P WKT 2010 10 16 02 54 55 31.3200 -97.3300 251.000 30.0 125.238 4.990 -999.990 -999.990 1.252 ..P WKT 2010 10 16 02 59 55 31.3200 -97.3300 251.000 122.0 130.118 4.520 -999.990 -999.990 1.301 ..P WKT 2010 10 16 03 04 55 31.3200 -97.3300 251.000 457.0 136.353 5.100 -999.990 -999.990 1.364 ..P WKT 2010 10 16 03 14 55 31.3200 -97.3300 251.000 30.0 119.222 4.820 -999.990 -999.990 1.192 ..P WKT 2010 10 16 03 19 55 31.3200 -97.3300 251.000 122.0 120.791 4.900 -999.990 -999.990 1.208 ..P WKT 2010 10 16 03 24 55 31.3200 -97.3300 251.000 457.0 140.797 4.930 -999.990 -999.990 1.408 ..P WKT 2010 10 16 03 29 55 31.3200 -97.3300 251.000 30.0 126.914 5.190 -999.990 -999.990 1.269 ..P WKT 2010 10 16 03 34 55 31.3200 -97.3300 251.000 122.0 123.874 5.010 -999.990 -999.990 1.239 ..P WKT 2010 10 16 03 39 55 31.3200 -97.3300 251.000 457.0 141.171 5.240 -999.990 -999.990 1.412 ..P WKT 2010 10 16 03 49 55 31.3200 -97.3300 251.000 30.0 123.316 6.220 -999.990 -999.990 1.233 ..P WKT 2010 10 16 03 54 55 31.3200 -97.3300 251.000 122.0 135.077 5.190 -999.990 -999.990 1.351 ..P WKT 2010 10 16 03 59 55 31.3200 -97.3300 251.000 457.0 129.208 6.680 -999.990 -999.990 1.292 ..P WKT 2010 10 16 04 04 55 31.3200 -97.3300 251.000 30.0 123.068 4.970 -999.990 -999.990 1.231 ..P WKT 2010 10 16 04 09 55 31.3200 -97.3300 251.000 122.0 124.794 4.710 -999.990 -999.990 1.248 ..P WKT 2010 10 16 04 14 55 31.3200 -97.3300 251.000 457.0 143.612 5.040 -999.990 -999.990 1.436 ..P WKT 2010 10 16 04 24 55 31.3200 -97.3300 251.000 30.0 126.581 4.700 -999.990 -999.990 1.266 ..P WKT 2010 10 16 04 29 55 31.3200 -97.3300 251.000 122.0 125.458 4.790 -999.990 -999.990 1.255 ..P WKT 2010 10 16 04 34 55 31.3200 -97.3300 251.000 457.0 128.135 4.700 -999.990 -999.990 1.281 ..P WKT 2010 10 16 04 39 55 31.3200 -97.3300 251.000 30.0 129.590 5.100 -999.990 -999.990 1.296 ..P WKT 2010 10 16 04 44 55 31.3200 -97.3300 251.000 122.0 130.232 5.090 -999.990 -999.990 1.302 ..P WKT 2010 10 16 04 49 55 31.3200 -97.3300 251.000 457.0 121.374 5.260 -999.990 -999.990 1.214 ..P WKT 2010 10 16 05 04 55 31.3200 -97.3300 251.000 30.0 127.113 4.920 -999.990 -999.990 1.271 ..P WKT 2010 10 16 05 09 55 31.3200 -97.3300 251.000 122.0 123.350 4.890 -999.990 -999.990 1.234 ..P WKT 2010 10 16 05 14 55 31.3200 -97.3300 251.000 457.0 118.092 4.770 -999.990 -999.990 1.181 ..P WKT 2010 10 16 05 19 55 31.3200 -97.3300 251.000 30.0 124.104 4.860 -999.990 -999.990 1.241 ..P WKT 2010 10 16 05 24 55 31.3200 -97.3300 251.000 122.0 124.685 4.430 -999.990 -999.990 1.247 ..P WKT 2010 10 16 05 29 55 31.3200 -97.3300 251.000 457.0 124.315 4.500 -999.990 -999.990 1.243 ..P WKT 2010 10 16 05 39 55 31.3200 -97.3300 251.000 30.0 132.968 4.400 -999.990 -999.990 1.330 ..P WKT 2010 10 16 05 44 55 31.3200 -97.3300 251.000 122.0 125.830 4.990 -999.990 -999.990 1.258 ..P WKT 2010 10 16 05 49 55 31.3200 -97.3300 251.000 457.0 154.141 4.690 -999.990 -999.990 1.541 ..P WKT 2010 10 16 05 54 55 31.3200 -97.3300 251.000 30.0 134.778 4.530 -999.990 -999.990 1.348 ..P WKT 2010 10 16 05 59 55 31.3200 -97.3300 251.000 122.0 119.352 4.220 -999.990 -999.990 1.194 ..P WKT 2010 10 16 06 04 55 31.3200 -97.3300 251.000 457.0 134.898 4.250 -999.990 -999.990 1.349 ..P WKT 2010 10 16 06 14 55 31.3200 -97.3300 251.000 30.0 129.177 4.400 -999.990 -999.990 1.292 ..P WKT 2010 10 16 06 19 55 31.3200 -97.3300 251.000 122.0 120.813 4.680 -999.990 -999.990 1.208 ..P WKT 2010 10 16 06 24 55 31.3200 -97.3300 251.000 457.0 180.935 4.750 -999.990 -999.990 1.809 ..P WKT 2010 10 16 06 29 55 31.3200 -97.3300 251.000 30.0 121.067 6.130 -999.990 -999.990 1.211 ..P WKT 2010 10 16 06 34 55 31.3200 -97.3300 251.000 122.0 130.368 4.620 -999.990 -999.990 1.304 ..P WKT 2010 10 16 06 39 55 31.3200 -97.3300 251.000 457.0 122.681 5.400 -999.990 -999.990 1.227 ..P WKT 2010 10 16 06 49 55 31.3200 -97.3300 251.000 30.0 132.568 5.120 -999.990 -999.990 1.326 ..P WKT 2010 10 16 06 54 55 31.3200 -97.3300 251.000 122.0 130.841 4.750 -999.990 -999.990 1.308 ..P WKT 2010 10 16 06 59 55 31.3200 -97.3300 251.000 457.0 125.308 4.800 -999.990 -999.990 1.253 ..P WKT 2010 10 16 07 04 55 31.3200 -97.3300 251.000 30.0 132.282 5.200 -999.990 -999.990 1.323 ..P WKT 2010 10 16 07 09 55 31.3200 -97.3300 251.000 122.0 124.844 4.650 -999.990 -999.990 1.248 ..P WKT 2010 10 16 07 14 55 31.3200 -97.3300 251.000 457.0 121.485 4.580 -999.990 -999.990 1.215 ..P WKT 2010 10 16 07 24 55 31.3200 -97.3300 251.000 30.0 128.598 5.530 -999.990 -999.990 1.286 ..P WKT 2010 10 16 07 29 55 31.3200 -97.3300 251.000 122.0 128.192 4.430 -999.990 -999.990 1.282 ..P WKT 2010 10 16 07 34 55 31.3200 -97.3300 251.000 457.0 114.456 5.100 -999.990 -999.990 1.145 ..P WKT 2010 10 16 07 39 55 31.3200 -97.3300 251.000 30.0 128.740 4.570 -999.990 -999.990 1.287 ..P WKT 2010 10 16 07 44 55 31.3200 -97.3300 251.000 122.0 125.340 4.640 -999.990 -999.990 1.253 ..P WKT 2010 10 16 07 49 55 31.3200 -97.3300 251.000 457.0 119.764 3.940 -999.990 -999.990 1.198 ..P WKT 2010 10 16 07 59 55 31.3200 -97.3300 251.000 30.0 138.388 4.760 -999.990 -999.990 1.384 ..P WKT 2010 10 16 08 04 55 31.3200 -97.3300 251.000 122.0 120.136 4.270 -999.990 -999.990 1.201 ..P WKT 2010 10 16 08 09 55 31.3200 -97.3300 251.000 457.0 124.473 4.330 -999.990 -999.990 1.245 ..P WKT 2010 10 16 08 14 55 31.3200 -97.3300 251.000 30.0 138.880 4.260 -999.990 -999.990 1.389 ..P WKT 2010 10 16 08 19 55 31.3200 -97.3300 251.000 122.0 127.703 4.510 -999.990 -999.990 1.277 ..P WKT 2010 10 16 08 24 55 31.3200 -97.3300 251.000 457.0 125.780 3.910 -999.990 -999.990 1.258 ..P WKT 2010 10 16 08 34 55 31.3200 -97.3300 251.000 30.0 141.632 4.540 -999.990 -999.990 1.416 ..P WKT 2010 10 16 08 39 55 31.3200 -97.3300 251.000 122.0 129.324 4.360 -999.990 -999.990 1.293 ..P WKT 2010 10 16 08 44 55 31.3200 -97.3300 251.000 457.0 121.643 4.360 -999.990 -999.990 1.216 ..P WKT 2010 10 16 08 49 55 31.3200 -97.3300 251.000 30.0 154.808 4.460 -999.990 -999.990 1.548 ..P WKT 2010 10 16 08 54 55 31.3200 -97.3300 251.000 122.0 133.102 4.890 -999.990 -999.990 1.331 ..P WKT 2010 10 16 08 59 55 31.3200 -97.3300 251.000 457.0 123.514 4.850 -999.990 -999.990 1.235 ..P WKT 2010 10 16 09 09 55 31.3200 -97.3300 251.000 30.0 155.736 5.200 -999.990 -999.990 1.557 ..P WKT 2010 10 16 09 14 55 31.3200 -97.3300 251.000 122.0 128.635 5.660 -999.990 -999.990 1.286 ..P WKT 2010 10 16 09 19 55 31.3200 -97.3300 251.000 457.0 124.278 5.560 -999.990 -999.990 1.243 ..P WKT 2010 10 16 09 24 55 31.3200 -97.3300 251.000 30.0 142.261 5.410 -999.990 -999.990 1.423 ..P WKT 2010 10 16 09 29 55 31.3200 -97.3300 251.000 122.0 124.417 4.790 -999.990 -999.990 1.244 ..P WKT 2010 10 16 09 34 55 31.3200 -97.3300 251.000 457.0 122.375 4.670 -999.990 -999.990 1.224 ..P WKT 2010 10 16 09 44 55 31.3200 -97.3300 251.000 30.0 142.797 4.680 -999.990 -999.990 1.428 ..P WKT 2010 10 16 09 49 55 31.3200 -97.3300 251.000 122.0 129.834 4.290 -999.990 -999.990 1.298 ..P WKT 2010 10 16 09 54 55 31.3200 -97.3300 251.000 457.0 125.319 5.600 -999.990 -999.990 1.253 ..P WKT 2010 10 16 09 59 55 31.3200 -97.3300 251.000 30.0 151.060 5.740 -999.990 -999.990 1.511 ..P WKT 2010 10 16 10 04 55 31.3200 -97.3300 251.000 122.0 123.239 5.480 -999.990 -999.990 1.232 ..P WKT 2010 10 16 10 09 55 31.3200 -97.3300 251.000 457.0 127.037 4.260 -999.990 -999.990 1.270 ..P WKT 2010 10 16 10 19 55 31.3200 -97.3300 251.000 30.0 163.614 4.260 -999.990 -999.990 1.636 ..P WKT 2010 10 16 10 24 55 31.3200 -97.3300 251.000 122.0 114.870 4.040 -999.990 -999.990 1.149 ..P WKT 2010 10 16 10 29 55 31.3200 -97.3300 251.000 457.0 121.473 5.170 -999.990 -999.990 1.215 ..P WKT 2010 10 16 10 34 55 31.3200 -97.3300 251.000 30.0 203.071 5.910 -999.990 -999.990 2.031 ..P WKT 2010 10 16 10 39 55 31.3200 -97.3300 251.000 122.0 122.411 5.060 -999.990 -999.990 1.224 ..P WKT 2010 10 16 10 44 55 31.3200 -97.3300 251.000 457.0 122.743 4.190 -999.990 -999.990 1.227 ..P WKT 2010 10 16 10 54 55 31.3200 -97.3300 251.000 30.0 190.434 4.810 -999.990 -999.990 1.904 ..P WKT 2010 10 16 10 59 55 31.3200 -97.3300 251.000 122.0 123.039 5.290 -999.990 -999.990 1.230 ..P WKT 2010 10 16 11 04 55 31.3200 -97.3300 251.000 457.0 120.020 5.370 -999.990 -999.990 1.200 ..P WKT 2010 10 16 11 09 55 31.3200 -97.3300 251.000 30.0 165.838 4.930 -999.990 -999.990 1.658 ..P WKT 2010 10 16 11 14 55 31.3200 -97.3300 251.000 122.0 120.529 4.960 -999.990 -999.990 1.205 ..P WKT 2010 10 16 11 19 55 31.3200 -97.3300 251.000 457.0 129.243 3.970 -999.990 -999.990 1.292 ..P WKT 2010 10 16 11 29 55 31.3200 -97.3300 251.000 30.0 150.568 4.580 -999.990 -999.990 1.506 ..P WKT 2010 10 16 11 34 55 31.3200 -97.3300 251.000 122.0 122.513 4.780 -999.990 -999.990 1.225 ..P WKT 2010 10 16 11 39 55 31.3200 -97.3300 251.000 457.0 125.024 5.070 -999.990 -999.990 1.250 ..P WKT 2010 10 16 11 44 55 31.3200 -97.3300 251.000 30.0 151.011 5.180 -999.990 -999.990 1.510 ..P WKT 2010 10 16 11 49 55 31.3200 -97.3300 251.000 122.0 125.134 4.350 -999.990 -999.990 1.251 ..P WKT 2010 10 16 12 09 55 31.3200 -97.3300 251.000 457.0 122.035 4.480 -999.990 -999.990 1.220 ..P WKT 2010 10 16 12 10 25 31.3200 -97.3300 251.000 457.0 127.723 4.430 -999.990 -999.990 1.277 ..P WKT 2010 10 16 12 10 55 31.3200 -97.3300 251.000 457.0 121.672 4.840 -999.990 -999.990 1.217 ..P WKT 2010 10 16 12 11 25 31.3200 -97.3300 251.000 457.0 118.352 4.330 -999.990 -999.990 1.184 ..P WKT 2010 10 16 12 11 55 31.3200 -97.3300 251.000 457.0 121.584 4.520 -999.990 -999.990 1.216 ..P WKT 2010 10 16 12 12 25 31.3200 -97.3300 251.000 457.0 122.359 4.510 -999.990 -999.990 1.224 ..P WKT 2010 10 16 12 12 55 31.3200 -97.3300 251.000 457.0 118.766 4.900 -999.990 -999.990 1.188 ..P WKT 2010 10 16 12 13 25 31.3200 -97.3300 251.000 457.0 114.627 4.450 -999.990 -999.990 1.146 ..P WKT 2010 10 16 12 13 55 31.3200 -97.3300 251.000 457.0 121.134 4.700 -999.990 -999.990 1.211 ..P WKT 2010 10 16 12 14 25 31.3200 -97.3300 251.000 457.0 125.731 5.080 -999.990 -999.990 1.257 ..P WKT 2010 10 16 12 14 55 31.3200 -97.3300 251.000 457.0 120.499 4.740 -999.990 -999.990 1.205 ..P WKT 2010 10 16 12 19 55 31.3200 -97.3300 251.000 30.0 145.444 4.790 -999.990 -999.990 1.454 ..P WKT 2010 10 16 12 24 55 31.3200 -97.3300 251.000 122.0 129.715 4.300 -999.990 -999.990 1.297 ..P WKT 2010 10 16 12 29 55 31.3200 -97.3300 251.000 457.0 121.766 4.640 -999.990 -999.990 1.218 ..P WKT 2010 10 16 12 34 55 31.3200 -97.3300 251.000 30.0 139.474 4.890 -999.990 -999.990 1.395 ..P WKT 2010 10 16 12 39 55 31.3200 -97.3300 251.000 122.0 126.340 4.890 -999.990 -999.990 1.263 ..P WKT 2010 10 16 12 44 55 31.3200 -97.3300 251.000 457.0 118.529 3.980 -999.990 -999.990 1.185 ..P WKT 2010 10 16 12 54 55 31.3200 -97.3300 251.000 30.0 139.104 4.170 -999.990 -999.990 1.391 ..P WKT 2010 10 16 12 59 55 31.3200 -97.3300 251.000 122.0 118.235 5.220 -999.990 -999.990 1.182 ..P WKT 2010 10 16 13 04 55 31.3200 -97.3300 251.000 457.0 119.606 5.450 -999.990 -999.990 1.196 ..P WKT 2010 10 16 13 09 55 31.3200 -97.3300 251.000 30.0 143.894 5.420 -999.990 -999.990 1.439 ..P WKT 2010 10 16 13 14 55 31.3200 -97.3300 251.000 122.0 126.711 4.500 -999.990 -999.990 1.267 ..P WKT 2010 10 16 13 19 55 31.3200 -97.3300 251.000 457.0 122.079 4.960 -999.990 -999.990 1.221 ..P WKT 2010 10 16 13 29 55 31.3200 -97.3300 251.000 30.0 146.544 4.520 -999.990 -999.990 1.465 ..P WKT 2010 10 16 13 34 55 31.3200 -97.3300 251.000 122.0 126.267 4.760 -999.990 -999.990 1.263 ..P WKT 2010 10 16 13 39 55 31.3200 -97.3300 251.000 457.0 158.496 6.150 -999.990 -999.990 1.585 ..P WKT 2010 10 16 13 44 55 31.3200 -97.3300 251.000 30.0 151.175 4.880 -999.990 -999.990 1.512 ..P WKT 2010 10 16 13 49 55 31.3200 -97.3300 251.000 122.0 124.492 4.750 -999.990 -999.990 1.245 ..P WKT 2010 10 16 13 54 55 31.3200 -97.3300 251.000 457.0 176.352 5.840 -999.990 -999.990 1.764 ..P WKT 2010 10 16 14 04 55 31.3200 -97.3300 251.000 30.0 146.753 4.820 -999.990 -999.990 1.468 ..P WKT 2010 10 16 14 09 55 31.3200 -97.3300 251.000 122.0 123.250 5.950 -999.990 -999.990 1.232 ..P WKT 2010 10 16 14 14 55 31.3200 -97.3300 251.000 457.0 194.495 6.540 -999.990 -999.990 1.945 ..P WKT 2010 10 16 14 19 55 31.3200 -97.3300 251.000 30.0 154.362 5.390 -999.990 -999.990 1.544 ..P WKT 2010 10 16 14 24 55 31.3200 -97.3300 251.000 122.0 136.179 5.680 -999.990 -999.990 1.362 ..P WKT 2010 10 16 14 29 55 31.3200 -97.3300 251.000 457.0 129.583 5.830 -999.990 -999.990 1.296 ..P WKT 2010 10 16 14 39 55 31.3200 -97.3300 251.000 30.0 144.352 5.960 -999.990 -999.990 1.444 ..P WKT 2010 10 16 14 44 55 31.3200 -97.3300 251.000 122.0 142.138 5.820 -999.990 -999.990 1.421 ..P WKT 2010 10 16 14 49 55 31.3200 -97.3300 251.000 457.0 133.928 5.980 -999.990 -999.990 1.339 ..P WKT 2010 10 16 14 54 55 31.3200 -97.3300 251.000 30.0 146.430 6.210 -999.990 -999.990 1.464 ..P WKT 2010 10 16 14 59 55 31.3200 -97.3300 251.000 122.0 142.854 5.980 -999.990 -999.990 1.429 ..P WKT 2010 10 16 15 04 55 31.3200 -97.3300 251.000 457.0 138.732 5.730 -999.990 -999.990 1.387 ..P WKT 2010 10 16 15 14 55 31.3200 -97.3300 251.000 30.0 143.063 5.660 -999.990 -999.990 1.431 ..P WKT 2010 10 16 15 19 55 31.3200 -97.3300 251.000 122.0 139.526 5.530 -999.990 -999.990 1.395 ..P WKT 2010 10 16 15 24 55 31.3200 -97.3300 251.000 457.0 133.537 5.160 -999.990 -999.990 1.335 ..P WKT 2010 10 16 15 29 55 31.3200 -97.3300 251.000 30.0 141.171 5.420 -999.990 -999.990 1.412 ..P WKT 2010 10 16 15 34 55 31.3200 -97.3300 251.000 122.0 147.713 4.980 -999.990 -999.990 1.477 ..P WKT 2010 10 16 15 39 55 31.3200 -97.3300 251.000 457.0 125.654 4.660 -999.990 -999.990 1.257 ..P WKT 2010 10 16 15 49 55 31.3200 -97.3300 251.000 30.0 156.132 5.390 -999.990 -999.990 1.561 ..P WKT 2010 10 16 15 54 55 31.3200 -97.3300 251.000 122.0 153.374 5.290 -999.990 -999.990 1.534 ..P WKT 2010 10 16 15 59 55 31.3200 -97.3300 251.000 457.0 128.829 5.800 -999.990 -999.990 1.288 ..P WKT 2010 10 16 16 04 55 31.3200 -97.3300 251.000 30.0 144.318 6.570 -999.990 -999.990 1.443 ..P WKT 2010 10 16 16 09 55 31.3200 -97.3300 251.000 122.0 142.378 6.480 -999.990 -999.990 1.424 ..P WKT 2010 10 16 16 14 55 31.3200 -97.3300 251.000 457.0 113.209 5.080 -999.990 -999.990 1.132 ..P WKT 2010 10 16 16 24 55 31.3200 -97.3300 251.000 30.0 136.734 5.800 -999.990 -999.990 1.367 ..P WKT 2010 10 16 16 29 55 31.3200 -97.3300 251.000 122.0 136.194 7.220 -999.990 -999.990 1.362 ..P WKT 2010 10 16 16 34 55 31.3200 -97.3300 251.000 457.0 131.028 6.640 -999.990 -999.990 1.310 ..P WKT 2010 10 16 16 39 55 31.3200 -97.3300 251.000 30.0 142.602 6.170 -999.990 -999.990 1.426 ..P WKT 2010 10 16 16 44 55 31.3200 -97.3300 251.000 122.0 141.518 6.280 -999.990 -999.990 1.415 ..P WKT 2010 10 16 16 49 55 31.3200 -97.3300 251.000 457.0 152.411 5.170 -999.990 -999.990 1.524 ..P WKT 2010 10 16 17 04 55 31.3200 -97.3300 251.000 30.0 150.645 5.880 -999.990 -999.990 1.506 ..P WKT 2010 10 16 17 09 55 31.3200 -97.3300 251.000 122.0 143.093 5.830 -999.990 -999.990 1.431 ..P WKT 2010 10 16 17 14 55 31.3200 -97.3300 251.000 457.0 146.563 6.810 -999.990 -999.990 1.466 ..P WKT 2010 10 16 17 19 55 31.3200 -97.3300 251.000 30.0 146.087 5.730 -999.990 -999.990 1.461 ..P WKT 2010 10 16 17 24 55 31.3200 -97.3300 251.000 122.0 146.019 6.620 -999.990 -999.990 1.460 ..P WKT 2010 10 16 17 29 55 31.3200 -97.3300 251.000 457.0 145.543 6.710 -999.990 -999.990 1.455 ..P WKT 2010 10 16 17 39 55 31.3200 -97.3300 251.000 30.0 145.732 5.610 -999.990 -999.990 1.457 ..P WKT 2010 10 16 17 44 55 31.3200 -97.3300 251.000 122.0 149.118 5.550 -999.990 -999.990 1.491 ..P WKT 2010 10 16 17 49 55 31.3200 -97.3300 251.000 457.0 153.183 5.450 -999.990 -999.990 1.532 ..P WKT 2010 10 16 17 54 55 31.3200 -97.3300 251.000 30.0 148.000 5.630 -999.990 -999.990 1.480 ..P WKT 2010 10 16 17 59 55 31.3200 -97.3300 251.000 122.0 150.025 5.410 -999.990 -999.990 1.500 ..P WKT 2010 10 16 18 04 55 31.3200 -97.3300 251.000 457.0 144.163 5.320 -999.990 -999.990 1.442 ..P WKT 2010 10 16 18 14 55 31.3200 -97.3300 251.000 30.0 142.657 5.290 -999.990 -999.990 1.427 ..P WKT 2010 10 16 18 19 55 31.3200 -97.3300 251.000 122.0 143.342 5.650 -999.990 -999.990 1.433 ..P WKT 2010 10 16 18 24 55 31.3200 -97.3300 251.000 457.0 141.580 5.700 -999.990 -999.990 1.416 ..P WKT 2010 10 16 18 29 55 31.3200 -97.3300 251.000 30.0 147.566 5.700 -999.990 -999.990 1.476 ..P WKT 2010 10 16 18 34 55 31.3200 -97.3300 251.000 122.0 142.949 5.730 -999.990 -999.990 1.429 ..P WKT 2010 10 16 18 39 55 31.3200 -97.3300 251.000 457.0 140.236 5.480 -999.990 -999.990 1.402 ..P WKT 2010 10 16 18 49 55 31.3200 -97.3300 251.000 30.0 141.489 5.770 -999.990 -999.990 1.415 ..P WKT 2010 10 16 18 54 55 31.3200 -97.3300 251.000 122.0 149.532 5.710 -999.990 -999.990 1.495 ..P WKT 2010 10 16 18 59 55 31.3200 -97.3300 251.000 457.0 140.179 6.330 -999.990 -999.990 1.402 ..P WKT 2010 10 16 19 04 55 31.3200 -97.3300 251.000 30.0 146.318 6.120 -999.990 -999.990 1.463 ..P WKT 2010 10 16 19 09 55 31.3200 -97.3300 251.000 122.0 137.511 5.810 -999.990 -999.990 1.375 ..P WKT 2010 10 16 19 14 55 31.3200 -97.3300 251.000 457.0 138.758 6.120 -999.990 -999.990 1.388 ..P WKT 2010 10 16 19 24 55 31.3200 -97.3300 251.000 30.0 146.415 5.960 -999.990 -999.990 1.464 ..P WKT 2010 10 16 19 29 55 31.3200 -97.3300 251.000 122.0 153.367 6.080 -999.990 -999.990 1.534 ..P WKT 2010 10 16 19 34 55 31.3200 -97.3300 251.000 457.0 151.353 6.260 -999.990 -999.990 1.514 ..P WKT 2010 10 16 19 39 55 31.3200 -97.3300 251.000 30.0 146.352 6.100 -999.990 -999.990 1.464 ..P WKT 2010 10 16 19 44 55 31.3200 -97.3300 251.000 122.0 148.141 5.940 -999.990 -999.990 1.481 ..P WKT 2010 10 16 19 49 55 31.3200 -97.3300 251.000 457.0 155.364 6.060 -999.990 -999.990 1.554 ..P WKT 2010 10 16 19 59 55 31.3200 -97.3300 251.000 30.0 149.553 6.020 -999.990 -999.990 1.496 ..P WKT 2010 10 16 20 04 55 31.3200 -97.3300 251.000 122.0 147.656 5.930 -999.990 -999.990 1.477 ..P WKT 2010 10 16 20 09 55 31.3200 -97.3300 251.000 457.0 150.648 6.150 -999.990 -999.990 1.506 ..P WKT 2010 10 16 20 14 55 31.3200 -97.3300 251.000 30.0 154.182 6.310 -999.990 -999.990 1.542 ..P WKT 2010 10 16 20 19 55 31.3200 -97.3300 251.000 122.0 153.644 6.270 -999.990 -999.990 1.536 ..P WKT 2010 10 16 20 24 55 31.3200 -97.3300 251.000 457.0 151.340 6.420 -999.990 -999.990 1.513 ..P WKT 2010 10 16 20 34 55 31.3200 -97.3300 251.000 30.0 151.058 6.970 -999.990 -999.990 1.511 ..P WKT 2010 10 16 20 39 55 31.3200 -97.3300 251.000 122.0 152.537 6.570 -999.990 -999.990 1.525 ..P WKT 2010 10 16 20 44 55 31.3200 -97.3300 251.000 457.0 148.178 7.270 -999.990 -999.990 1.482 ..P WKT 2010 10 16 20 49 55 31.3200 -97.3300 251.000 30.0 151.285 6.570 -999.990 -999.990 1.513 ..P WKT 2010 10 16 20 54 55 31.3200 -97.3300 251.000 122.0 152.899 7.000 -999.990 -999.990 1.529 ..P WKT 2010 10 16 20 59 55 31.3200 -97.3300 251.000 457.0 146.505 6.230 -999.990 -999.990 1.465 ..P WKT 2010 10 16 21 09 55 31.3200 -97.3300 251.000 30.0 147.310 7.390 -999.990 -999.990 1.473 ..P WKT 2010 10 16 21 14 55 31.3200 -97.3300 251.000 122.0 147.586 6.500 -999.990 -999.990 1.476 ..P WKT 2010 10 16 21 19 55 31.3200 -97.3300 251.000 457.0 143.927 6.430 -999.990 -999.990 1.439 ..P WKT 2010 10 16 21 24 55 31.3200 -97.3300 251.000 30.0 139.998 6.460 -999.990 -999.990 1.400 ..P WKT 2010 10 16 21 29 55 31.3200 -97.3300 251.000 122.0 135.798 6.900 -999.990 -999.990 1.358 ..P WKT 2010 10 16 21 34 55 31.3200 -97.3300 251.000 457.0 148.689 6.700 -999.990 -999.990 1.487 ..P WKT 2010 10 16 21 44 55 31.3200 -97.3300 251.000 30.0 147.226 6.930 -999.990 -999.990 1.472 ..P WKT 2010 10 16 21 49 55 31.3200 -97.3300 251.000 122.0 147.115 6.740 -999.990 -999.990 1.471 ..P WKT 2010 10 16 21 54 55 31.3200 -97.3300 251.000 457.0 145.376 6.790 -999.990 -999.990 1.454 ..P WKT 2010 10 16 21 59 55 31.3200 -97.3300 251.000 30.0 148.519 6.900 -999.990 -999.990 1.485 ..P WKT 2010 10 16 22 04 55 31.3200 -97.3300 251.000 122.0 151.119 6.960 -999.990 -999.990 1.511 ..P WKT 2010 10 16 22 09 55 31.3200 -97.3300 251.000 457.0 150.465 6.850 -999.990 -999.990 1.505 ..P WKT 2010 10 16 22 19 55 31.3200 -97.3300 251.000 30.0 147.453 7.010 -999.990 -999.990 1.475 ..P WKT 2010 10 16 22 24 55 31.3200 -97.3300 251.000 122.0 145.773 6.760 -999.990 -999.990 1.458 ..P WKT 2010 10 16 22 29 55 31.3200 -97.3300 251.000 457.0 142.602 7.550 -999.990 -999.990 1.426 ..P WKT 2010 10 16 22 34 55 31.3200 -97.3300 251.000 30.0 143.769 7.200 -999.990 -999.990 1.438 ..P WKT 2010 10 16 22 39 55 31.3200 -97.3300 251.000 122.0 153.610 7.060 -999.990 -999.990 1.536 ..P WKT 2010 10 16 22 44 55 31.3200 -97.3300 251.000 457.0 147.457 6.890 -999.990 -999.990 1.475 ..P WKT 2010 10 16 22 54 55 31.3200 -97.3300 251.000 30.0 147.312 7.040 -999.990 -999.990 1.473 ..P WKT 2010 10 16 22 59 55 31.3200 -97.3300 251.000 122.0 146.542 7.230 -999.990 -999.990 1.465 ..P WKT 2010 10 16 23 04 55 31.3200 -97.3300 251.000 457.0 141.166 7.710 -999.990 -999.990 1.412 ..P WKT 2010 10 16 23 09 55 31.3200 -97.3300 251.000 30.0 150.152 7.230 -999.990 -999.990 1.502 ..P WKT 2010 10 16 23 14 55 31.3200 -97.3300 251.000 122.0 152.363 7.120 -999.990 -999.990 1.524 ..P WKT 2010 10 16 23 19 55 31.3200 -97.3300 251.000 457.0 152.948 7.140 -999.990 -999.990 1.529 ..P WKT 2010 10 16 23 29 55 31.3200 -97.3300 251.000 30.0 159.797 7.170 -999.990 -999.990 1.598 ..P WKT 2010 10 16 23 34 55 31.3200 -97.3300 251.000 122.0 155.496 7.840 -999.990 -999.990 1.555 ..P WKT 2010 10 16 23 39 55 31.3200 -97.3300 251.000 457.0 162.030 7.800 -999.990 -999.990 1.620 ..P WKT 2010 10 16 23 44 55 31.3200 -97.3300 251.000 30.0 163.146 7.060 -999.990 -999.990 1.631 ..P WKT 2010 10 16 23 49 55 31.3200 -97.3300 251.000 122.0 156.679 7.240 -999.990 -999.990 1.567 ..P WKT 2010 10 17 00 09 55 31.3200 -97.3300 251.000 457.0 156.728 7.560 -999.990 -999.990 1.567 ..P WKT 2010 10 17 00 10 25 31.3200 -97.3300 251.000 457.0 161.859 6.980 -999.990 -999.990 1.619 ..P WKT 2010 10 17 00 10 55 31.3200 -97.3300 251.000 457.0 163.200 6.970 -999.990 -999.990 1.632 ..P WKT 2010 10 17 00 11 25 31.3200 -97.3300 251.000 457.0 164.811 7.070 -999.990 -999.990 1.648 ..P WKT 2010 10 17 00 11 55 31.3200 -97.3300 251.000 457.0 159.921 7.330 -999.990 -999.990 1.599 ..P WKT 2010 10 17 00 12 25 31.3200 -97.3300 251.000 457.0 160.177 7.000 -999.990 -999.990 1.602 ..P WKT 2010 10 17 00 12 55 31.3200 -97.3300 251.000 457.0 158.809 7.000 -999.990 -999.990 1.588 ..P WKT 2010 10 17 00 13 25 31.3200 -97.3300 251.000 457.0 160.961 6.940 -999.990 -999.990 1.610 ..P WKT 2010 10 17 00 13 55 31.3200 -97.3300 251.000 457.0 160.135 6.960 -999.990 -999.990 1.601 ..P WKT 2010 10 17 00 14 25 31.3200 -97.3300 251.000 457.0 161.475 7.210 -999.990 -999.990 1.615 ..P WKT 2010 10 17 00 14 55 31.3200 -97.3300 251.000 457.0 159.700 7.030 -999.990 -999.990 1.597 ..P WKT 2010 10 17 00 19 55 31.3200 -97.3300 251.000 30.0 158.881 7.170 -999.990 -999.990 1.589 ..P WKT 2010 10 17 00 24 55 31.3200 -97.3300 251.000 122.0 162.125 7.330 -999.990 -999.990 1.621 ..P WKT 2010 10 17 00 29 55 31.3200 -97.3300 251.000 457.0 164.556 7.450 -999.990 -999.990 1.646 ..P WKT 2010 10 17 00 34 55 31.3200 -97.3300 251.000 30.0 154.931 7.200 -999.990 -999.990 1.549 ..P WKT 2010 10 17 00 39 55 31.3200 -97.3300 251.000 122.0 163.731 7.050 -999.990 -999.990 1.637 ..P WKT 2010 10 17 00 44 55 31.3200 -97.3300 251.000 457.0 164.944 7.630 -999.990 -999.990 1.649 ..P WKT 2010 10 17 00 54 55 31.3200 -97.3300 251.000 30.0 158.901 6.970 -999.990 -999.990 1.589 ..P WKT 2010 10 17 00 59 55 31.3200 -97.3300 251.000 122.0 149.882 7.370 -999.990 -999.990 1.499 ..P WKT 2010 10 17 01 04 55 31.3200 -97.3300 251.000 457.0 161.058 7.480 -999.990 -999.990 1.611 ..P WKT 2010 10 17 01 09 55 31.3200 -97.3300 251.000 30.0 151.360 7.380 -999.990 -999.990 1.514 ..P WKT 2010 10 17 01 14 55 31.3200 -97.3300 251.000 122.0 151.422 7.200 -999.990 -999.990 1.514 ..P WKT 2010 10 17 01 19 55 31.3200 -97.3300 251.000 457.0 158.398 7.320 -999.990 -999.990 1.584 ..P WKT 2010 10 17 01 29 55 31.3200 -97.3300 251.000 30.0 159.006 7.180 -999.990 -999.990 1.590 ..P WKT 2010 10 17 01 34 55 31.3200 -97.3300 251.000 122.0 159.010 7.120 -999.990 -999.990 1.590 ..P WKT 2010 10 17 01 39 55 31.3200 -97.3300 251.000 457.0 152.639 7.020 -999.990 -999.990 1.526 ..P WKT 2010 10 17 01 44 55 31.3200 -97.3300 251.000 30.0 156.440 7.860 -999.990 -999.990 1.564 ..P WKT 2010 10 17 01 49 55 31.3200 -97.3300 251.000 122.0 165.668 7.140 -999.990 -999.990 1.657 ..P WKT 2010 10 17 01 54 55 31.3200 -97.3300 251.000 457.0 162.281 7.060 -999.990 -999.990 1.623 ..P WKT 2010 10 17 02 04 55 31.3200 -97.3300 251.000 30.0 152.248 7.320 -999.990 -999.990 1.522 ..P WKT 2010 10 17 02 09 55 31.3200 -97.3300 251.000 122.0 156.187 7.260 -999.990 -999.990 1.562 ..P WKT 2010 10 17 02 14 55 31.3200 -97.3300 251.000 457.0 147.776 7.000 -999.990 -999.990 1.478 ..P WKT 2010 10 17 02 19 55 31.3200 -97.3300 251.000 30.0 153.616 7.090 -999.990 -999.990 1.536 ..P WKT 2010 10 17 02 24 55 31.3200 -97.3300 251.000 122.0 151.583 6.970 -999.990 -999.990 1.516 ..P WKT 2010 10 17 02 29 55 31.3200 -97.3300 251.000 457.0 153.350 7.100 -999.990 -999.990 1.534 ..P WKT 2010 10 17 02 39 55 31.3200 -97.3300 251.000 30.0 160.534 7.970 -999.990 -999.990 1.605 ..P WKT 2010 10 17 02 44 55 31.3200 -97.3300 251.000 122.0 149.385 7.160 -999.990 -999.990 1.494 ..P WKT 2010 10 17 02 49 55 31.3200 -97.3300 251.000 457.0 149.640 6.940 -999.990 -999.990 1.496 ..P WKT 2010 10 17 02 54 55 31.3200 -97.3300 251.000 30.0 158.043 6.980 -999.990 -999.990 1.580 ..P WKT 2010 10 17 02 59 55 31.3200 -97.3300 251.000 122.0 156.398 7.040 -999.990 -999.990 1.564 ..P WKT 2010 10 17 03 04 55 31.3200 -97.3300 251.000 457.0 149.863 6.860 -999.990 -999.990 1.499 ..P WKT 2010 10 17 03 14 55 31.3200 -97.3300 251.000 30.0 153.983 7.400 -999.990 -999.990 1.540 ..P WKT 2010 10 17 03 19 55 31.3200 -97.3300 251.000 122.0 147.524 7.170 -999.990 -999.990 1.475 ..P WKT 2010 10 17 03 24 55 31.3200 -97.3300 251.000 457.0 148.400 7.150 -999.990 -999.990 1.484 ..P WKT 2010 10 17 03 29 55 31.3200 -97.3300 251.000 30.0 156.614 6.990 -999.990 -999.990 1.566 ..P WKT 2010 10 17 03 34 55 31.3200 -97.3300 251.000 122.0 150.153 6.730 -999.990 -999.990 1.502 ..P WKT 2010 10 17 03 39 55 31.3200 -97.3300 251.000 457.0 141.244 6.600 -999.990 -999.990 1.412 ..P WKT 2010 10 17 03 49 55 31.3200 -97.3300 251.000 30.0 160.570 6.640 -999.990 -999.990 1.606 ..P WKT 2010 10 17 03 54 55 31.3200 -97.3300 251.000 122.0 151.020 6.770 -999.990 -999.990 1.510 ..P WKT 2010 10 17 03 59 55 31.3200 -97.3300 251.000 457.0 143.099 7.300 -999.990 -999.990 1.431 ..P WKT 2010 10 17 04 04 55 31.3200 -97.3300 251.000 30.0 158.019 6.850 -999.990 -999.990 1.580 ..P WKT 2010 10 17 04 09 55 31.3200 -97.3300 251.000 122.0 146.562 7.050 -999.990 -999.990 1.466 ..P WKT 2010 10 17 04 14 55 31.3200 -97.3300 251.000 457.0 144.622 6.990 -999.990 -999.990 1.446 ..P WKT 2010 10 17 04 24 55 31.3200 -97.3300 251.000 30.0 154.828 7.050 -999.990 -999.990 1.548 ..P WKT 2010 10 17 04 29 55 31.3200 -97.3300 251.000 122.0 146.165 6.810 -999.990 -999.990 1.462 ..P WKT 2010 10 17 04 34 55 31.3200 -97.3300 251.000 457.0 144.982 7.140 -999.990 -999.990 1.450 ..P WKT 2010 10 17 04 39 55 31.3200 -97.3300 251.000 30.0 159.172 6.860 -999.990 -999.990 1.592 ..P WKT 2010 10 17 04 44 55 31.3200 -97.3300 251.000 122.0 150.371 6.850 -999.990 -999.990 1.504 ..P WKT 2010 10 17 04 49 55 31.3200 -97.3300 251.000 457.0 147.284 6.690 -999.990 -999.990 1.473 ..P WKT 2010 10 17 05 04 55 31.3200 -97.3300 251.000 30.0 153.495 6.840 -999.990 -999.990 1.535 ..P WKT 2010 10 17 05 09 55 31.3200 -97.3300 251.000 122.0 146.372 6.720 -999.990 -999.990 1.464 ..P WKT 2010 10 17 05 14 55 31.3200 -97.3300 251.000 457.0 155.174 6.870 -999.990 -999.990 1.552 ..P WKT 2010 10 17 05 19 55 31.3200 -97.3300 251.000 30.0 158.532 6.680 -999.990 -999.990 1.585 ..P WKT 2010 10 17 05 24 55 31.3200 -97.3300 251.000 122.0 139.971 7.060 -999.990 -999.990 1.400 ..P WKT 2010 10 17 05 29 55 31.3200 -97.3300 251.000 457.0 147.959 6.400 -999.990 -999.990 1.480 ..P WKT 2010 10 17 05 39 55 31.3200 -97.3300 251.000 30.0 159.296 6.580 -999.990 -999.990 1.593 ..P WKT 2010 10 17 05 44 55 31.3200 -97.3300 251.000 122.0 154.339 6.870 -999.990 -999.990 1.543 ..P WKT 2010 10 17 05 49 55 31.3200 -97.3300 251.000 457.0 154.556 7.560 -999.990 -999.990 1.546 ..P WKT 2010 10 17 05 54 55 31.3200 -97.3300 251.000 30.0 166.761 8.670 -999.990 -999.990 1.668 ..P WKT 2010 10 17 05 59 55 31.3200 -97.3300 251.000 122.0 149.815 8.440 -999.990 -999.990 1.498 ..P WKT 2010 10 17 06 04 55 31.3200 -97.3300 251.000 457.0 155.754 7.300 -999.990 -999.990 1.558 ..P WKT 2010 10 17 06 14 55 31.3200 -97.3300 251.000 30.0 162.789 6.940 -999.990 -999.990 1.628 ..P WKT 2010 10 17 06 19 55 31.3200 -97.3300 251.000 122.0 145.487 7.810 -999.990 -999.990 1.455 ..P WKT 2010 10 17 06 24 55 31.3200 -97.3300 251.000 457.0 146.443 8.330 -999.990 -999.990 1.464 ..P WKT 2010 10 17 06 29 55 31.3200 -97.3300 251.000 30.0 153.670 7.480 -999.990 -999.990 1.537 ..P WKT 2010 10 17 06 34 55 31.3200 -97.3300 251.000 122.0 141.269 7.020 -999.990 -999.990 1.413 ..P WKT 2010 10 17 06 39 55 31.3200 -97.3300 251.000 457.0 149.042 7.010 -999.990 -999.990 1.490 ..P WKT 2010 10 17 06 49 55 31.3200 -97.3300 251.000 30.0 157.345 6.450 -999.990 -999.990 1.573 ..P WKT 2010 10 17 06 54 55 31.3200 -97.3300 251.000 122.0 146.967 7.250 -999.990 -999.990 1.470 ..P WKT 2010 10 17 06 59 55 31.3200 -97.3300 251.000 457.0 145.586 7.350 -999.990 -999.990 1.456 ..P WKT 2010 10 17 07 04 55 31.3200 -97.3300 251.000 30.0 162.480 7.150 -999.990 -999.990 1.625 ..P WKT 2010 10 17 07 09 55 31.3200 -97.3300 251.000 122.0 144.462 6.290 -999.990 -999.990 1.445 ..P WKT 2010 10 17 07 14 55 31.3200 -97.3300 251.000 457.0 151.537 6.520 -999.990 -999.990 1.515 ..P WKT 2010 10 17 07 24 55 31.3200 -97.3300 251.000 30.0 162.146 6.150 -999.990 -999.990 1.621 ..P WKT 2010 10 17 07 29 55 31.3200 -97.3300 251.000 122.0 157.219 6.420 -999.990 -999.990 1.572 ..P WKT 2010 10 17 07 34 55 31.3200 -97.3300 251.000 457.0 142.467 6.150 -999.990 -999.990 1.425 ..P WKT 2010 10 17 07 39 55 31.3200 -97.3300 251.000 30.0 165.375 6.230 -999.990 -999.990 1.654 ..P WKT 2010 10 17 07 44 55 31.3200 -97.3300 251.000 122.0 160.174 6.480 -999.990 -999.990 1.602 ..P WKT 2010 10 17 07 49 55 31.3200 -97.3300 251.000 457.0 142.416 6.460 -999.990 -999.990 1.424 ..P WKT 2010 10 17 07 59 55 31.3200 -97.3300 251.000 30.0 158.587 6.820 -999.990 -999.990 1.586 ..P WKT 2010 10 17 08 04 55 31.3200 -97.3300 251.000 122.0 173.958 6.400 -999.990 -999.990 1.740 ..P WKT 2010 10 17 08 09 55 31.3200 -97.3300 251.000 457.0 155.474 6.550 -999.990 -999.990 1.555 ..P WKT 2010 10 17 08 14 55 31.3200 -97.3300 251.000 30.0 161.973 6.950 -999.990 -999.990 1.620 ..P WKT 2010 10 17 08 19 55 31.3200 -97.3300 251.000 122.0 188.682 6.570 -999.990 -999.990 1.887 ..P WKT 2010 10 17 08 24 55 31.3200 -97.3300 251.000 457.0 150.256 7.230 -999.990 -999.990 1.503 ..P WKT 2010 10 17 08 34 55 31.3200 -97.3300 251.000 30.0 169.736 6.970 -999.990 -999.990 1.697 ..P WKT 2010 10 17 08 39 55 31.3200 -97.3300 251.000 122.0 179.848 6.900 -999.990 -999.990 1.798 ..P WKT 2010 10 17 08 44 55 31.3200 -97.3300 251.000 457.0 145.292 6.780 -999.990 -999.990 1.453 ..P WKT 2010 10 17 08 49 55 31.3200 -97.3300 251.000 30.0 183.001 7.800 -999.990 -999.990 1.830 ..P WKT 2010 10 17 08 54 55 31.3200 -97.3300 251.000 122.0 173.307 7.060 -999.990 -999.990 1.733 ..P WKT 2010 10 17 08 59 55 31.3200 -97.3300 251.000 457.0 154.046 6.540 -999.990 -999.990 1.540 ..P WKT 2010 10 17 09 09 55 31.3200 -97.3300 251.000 30.0 176.426 6.500 -999.990 -999.990 1.764 ..P WKT 2010 10 17 09 14 55 31.3200 -97.3300 251.000 122.0 156.301 6.620 -999.990 -999.990 1.563 ..P WKT 2010 10 17 09 19 55 31.3200 -97.3300 251.000 457.0 149.704 6.810 -999.990 -999.990 1.497 ..P WKT 2010 10 17 09 24 55 31.3200 -97.3300 251.000 30.0 179.196 6.970 -999.990 -999.990 1.792 ..P WKT 2010 10 17 09 29 55 31.3200 -97.3300 251.000 122.0 159.613 6.660 -999.990 -999.990 1.596 ..P WKT 2010 10 17 09 34 55 31.3200 -97.3300 251.000 457.0 145.905 6.700 -999.990 -999.990 1.459 ..P WKT 2010 10 17 09 44 55 31.3200 -97.3300 251.000 30.0 184.219 6.380 -999.990 -999.990 1.842 ..P WKT 2010 10 17 09 49 55 31.3200 -97.3300 251.000 122.0 156.795 6.400 -999.990 -999.990 1.568 ..P WKT 2010 10 17 09 54 55 31.3200 -97.3300 251.000 457.0 152.208 6.360 -999.990 -999.990 1.522 ..P WKT 2010 10 17 09 59 55 31.3200 -97.3300 251.000 30.0 182.772 6.870 -999.990 -999.990 1.828 ..P WKT 2010 10 17 10 04 55 31.3200 -97.3300 251.000 122.0 153.426 6.260 -999.990 -999.990 1.534 ..P WKT 2010 10 17 10 09 55 31.3200 -97.3300 251.000 457.0 147.469 5.940 -999.990 -999.990 1.475 ..P WKT 2010 10 17 10 19 55 31.3200 -97.3300 251.000 30.0 187.408 5.970 -999.990 -999.990 1.874 ..P WKT 2010 10 17 10 24 55 31.3200 -97.3300 251.000 122.0 145.053 6.310 -999.990 -999.990 1.451 ..P WKT 2010 10 17 10 29 55 31.3200 -97.3300 251.000 457.0 145.662 6.500 -999.990 -999.990 1.457 ..P WKT 2010 10 17 10 34 55 31.3200 -97.3300 251.000 30.0 183.771 6.140 -999.990 -999.990 1.838 ..P WKT 2010 10 17 10 39 55 31.3200 -97.3300 251.000 122.0 141.131 6.320 -999.990 -999.990 1.411 ..P WKT 2010 10 17 10 44 55 31.3200 -97.3300 251.000 457.0 138.181 6.670 -999.990 -999.990 1.382 ..P WKT 2010 10 17 10 54 55 31.3200 -97.3300 251.000 30.0 170.769 6.340 -999.990 -999.990 1.708 ..P WKT 2010 10 17 10 59 55 31.3200 -97.3300 251.000 122.0 133.200 6.780 -999.990 -999.990 1.332 ..P WKT 2010 10 17 11 04 55 31.3200 -97.3300 251.000 457.0 139.989 6.000 -999.990 -999.990 1.400 ..P WKT 2010 10 17 11 09 55 31.3200 -97.3300 251.000 30.0 160.200 6.520 -999.990 -999.990 1.602 ..P WKT 2010 10 17 11 14 55 31.3200 -97.3300 251.000 122.0 131.112 6.380 -999.990 -999.990 1.311 ..P WKT 2010 10 17 11 19 55 31.3200 -97.3300 251.000 457.0 135.985 5.960 -999.990 -999.990 1.360 ..P WKT 2010 10 17 11 29 55 31.3200 -97.3300 251.000 30.0 162.320 5.810 -999.990 -999.990 1.623 ..P WKT 2010 10 17 11 34 55 31.3200 -97.3300 251.000 122.0 143.506 5.910 -999.990 -999.990 1.435 ..P WKT 2010 10 17 11 39 55 31.3200 -97.3300 251.000 457.0 141.404 6.760 -999.990 -999.990 1.414 ..P WKT 2010 10 17 11 44 55 31.3200 -97.3300 251.000 30.0 174.381 5.900 -999.990 -999.990 1.744 ..P WKT 2010 10 17 11 49 55 31.3200 -97.3300 251.000 122.0 148.437 5.830 -999.990 -999.990 1.484 ..P WKT 2010 10 17 12 09 55 31.3200 -97.3300 251.000 457.0 140.318 6.940 -999.990 -999.990 1.403 ..P WKT 2010 10 17 12 10 25 31.3200 -97.3300 251.000 457.0 140.739 6.080 -999.990 -999.990 1.407 ..P WKT 2010 10 17 12 10 55 31.3200 -97.3300 251.000 457.0 137.869 6.260 -999.990 -999.990 1.379 ..P WKT 2010 10 17 12 11 25 31.3200 -97.3300 251.000 457.0 136.233 6.040 -999.990 -999.990 1.362 ..P WKT 2010 10 17 12 11 55 31.3200 -97.3300 251.000 457.0 143.645 6.210 -999.990 -999.990 1.436 ..P WKT 2010 10 17 12 12 25 31.3200 -97.3300 251.000 457.0 142.146 5.990 -999.990 -999.990 1.421 ..P WKT 2010 10 17 12 12 55 31.3200 -97.3300 251.000 457.0 142.841 5.830 -999.990 -999.990 1.428 ..P WKT 2010 10 17 12 13 25 31.3200 -97.3300 251.000 457.0 138.600 5.940 -999.990 -999.990 1.386 ..P WKT 2010 10 17 12 13 55 31.3200 -97.3300 251.000 457.0 140.803 6.100 -999.990 -999.990 1.408 ..P WKT 2010 10 17 12 14 25 31.3200 -97.3300 251.000 457.0 141.086 5.770 -999.990 -999.990 1.411 ..P WKT 2010 10 17 12 14 55 31.3200 -97.3300 251.000 457.0 142.192 5.820 -999.990 -999.990 1.422 ..P WKT 2010 10 17 12 19 55 31.3200 -97.3300 251.000 30.0 165.457 6.320 -999.990 -999.990 1.655 ..P WKT 2010 10 17 12 24 55 31.3200 -97.3300 251.000 122.0 142.513 7.190 -999.990 -999.990 1.425 ..P WKT 2010 10 17 12 29 55 31.3200 -97.3300 251.000 457.0 141.782 5.910 -999.990 -999.990 1.418 ..P WKT 2010 10 17 12 34 55 31.3200 -97.3300 251.000 30.0 172.324 5.920 -999.990 -999.990 1.723 ..P WKT 2010 10 17 12 39 55 31.3200 -97.3300 251.000 122.0 145.532 6.120 -999.990 -999.990 1.455 ..P WKT 2010 10 17 12 44 55 31.3200 -97.3300 251.000 457.0 140.686 6.020 -999.990 -999.990 1.407 ..P WKT 2010 10 17 12 54 55 31.3200 -97.3300 251.000 30.0 172.566 6.350 -999.990 -999.990 1.726 ..P WKT 2010 10 17 12 59 55 31.3200 -97.3300 251.000 122.0 136.703 5.930 -999.990 -999.990 1.367 ..P WKT 2010 10 17 13 04 55 31.3200 -97.3300 251.000 457.0 138.576 5.640 -999.990 -999.990 1.386 ..P WKT 2010 10 17 13 09 55 31.3200 -97.3300 251.000 30.0 164.472 5.760 -999.990 -999.990 1.645 ..P WKT 2010 10 17 13 14 55 31.3200 -97.3300 251.000 122.0 136.421 5.660 -999.990 -999.990 1.364 ..P WKT 2010 10 17 13 19 55 31.3200 -97.3300 251.000 457.0 139.943 5.780 -999.990 -999.990 1.399 ..P WKT 2010 10 17 13 29 55 31.3200 -97.3300 251.000 30.0 161.271 6.150 -999.990 -999.990 1.613 ..P WKT 2010 10 17 13 34 55 31.3200 -97.3300 251.000 122.0 133.756 6.120 -999.990 -999.990 1.338 ..P WKT 2010 10 17 13 39 55 31.3200 -97.3300 251.000 457.0 123.681 6.600 -999.990 -999.990 1.237 ..P WKT 2010 10 17 13 44 55 31.3200 -97.3300 251.000 30.0 160.997 6.020 -999.990 -999.990 1.610 ..P WKT 2010 10 17 13 49 55 31.3200 -97.3300 251.000 122.0 141.580 6.570 -999.990 -999.990 1.416 ..P WKT 2010 10 17 13 54 55 31.3200 -97.3300 251.000 457.0 135.074 6.310 -999.990 -999.990 1.351 ..P WKT 2010 10 17 14 04 55 31.3200 -97.3300 251.000 30.0 164.683 6.200 -999.990 -999.990 1.647 ..P WKT 2010 10 17 14 09 55 31.3200 -97.3300 251.000 122.0 141.704 5.910 -999.990 -999.990 1.417 ..P WKT 2010 10 17 14 14 55 31.3200 -97.3300 251.000 457.0 123.667 5.660 -999.990 -999.990 1.237 ..P WKT 2010 10 17 14 19 55 31.3200 -97.3300 251.000 30.0 169.144 5.480 -999.990 -999.990 1.691 ..P WKT 2010 10 17 14 24 55 31.3200 -97.3300 251.000 122.0 136.257 5.320 -999.990 -999.990 1.363 ..P WKT 2010 10 17 14 29 55 31.3200 -97.3300 251.000 457.0 131.690 5.130 -999.990 -999.990 1.317 ..P WKT 2010 10 17 14 39 55 31.3200 -97.3300 251.000 30.0 170.655 5.900 -999.990 -999.990 1.707 ..P WKT 2010 10 17 14 44 55 31.3200 -97.3300 251.000 122.0 150.095 5.450 -999.990 -999.990 1.501 ..P WKT 2010 10 17 14 49 55 31.3200 -97.3300 251.000 457.0 132.832 5.800 -999.990 -999.990 1.328 ..P WKT 2010 10 17 14 54 55 31.3200 -97.3300 251.000 30.0 167.299 5.440 -999.990 -999.990 1.673 ..P WKT 2010 10 17 14 59 55 31.3200 -97.3300 251.000 122.0 152.235 5.730 -999.990 -999.990 1.522 ..P WKT 2010 10 17 15 04 55 31.3200 -97.3300 251.000 457.0 131.939 6.890 -999.990 -999.990 1.319 ..P WKT 2010 10 17 15 14 55 31.3200 -97.3300 251.000 30.0 147.573 5.490 -999.990 -999.990 1.476 ..P WKT 2010 10 17 15 19 55 31.3200 -97.3300 251.000 122.0 149.650 5.570 -999.990 -999.990 1.497 ..P WKT 2010 10 17 15 24 55 31.3200 -97.3300 251.000 457.0 127.771 5.450 -999.990 -999.990 1.278 ..P WKT 2010 10 17 15 29 55 31.3200 -97.3300 251.000 30.0 149.124 5.330 -999.990 -999.990 1.491 ..P WKT 2010 10 17 15 34 55 31.3200 -97.3300 251.000 122.0 154.782 5.200 -999.990 -999.990 1.548 ..P WKT 2010 10 17 15 39 55 31.3200 -97.3300 251.000 457.0 133.447 5.280 -999.990 -999.990 1.334 ..P WKT 2010 10 17 15 49 55 31.3200 -97.3300 251.000 30.0 151.593 4.960 -999.990 -999.990 1.516 ..P WKT 2010 10 17 15 54 55 31.3200 -97.3300 251.000 122.0 150.031 5.750 -999.990 -999.990 1.500 ..P WKT 2010 10 17 15 59 55 31.3200 -97.3300 251.000 457.0 135.655 5.190 -999.990 -999.990 1.357 ..P WKT 2010 10 17 16 04 55 31.3200 -97.3300 251.000 30.0 139.603 5.440 -999.990 -999.990 1.396 ..P WKT 2010 10 17 16 09 55 31.3200 -97.3300 251.000 122.0 136.936 5.700 -999.990 -999.990 1.369 ..P WKT 2010 10 17 16 14 55 31.3200 -97.3300 251.000 457.0 137.025 5.850 -999.990 -999.990 1.370 ..P WKT 2010 10 17 16 24 55 31.3200 -97.3300 251.000 30.0 141.360 5.270 -999.990 -999.990 1.414 ..P WKT 2010 10 17 16 29 55 31.3200 -97.3300 251.000 122.0 144.228 5.640 -999.990 -999.990 1.442 ..P WKT 2010 10 17 16 34 55 31.3200 -97.3300 251.000 457.0 136.478 5.120 -999.990 -999.990 1.365 ..P WKT 2010 10 17 16 39 55 31.3200 -97.3300 251.000 30.0 138.656 5.170 -999.990 -999.990 1.387 ..P WKT 2010 10 17 16 44 55 31.3200 -97.3300 251.000 122.0 142.214 4.980 -999.990 -999.990 1.422 ..P WKT 2010 10 17 16 49 55 31.3200 -97.3300 251.000 457.0 141.358 5.110 -999.990 -999.990 1.414 ..P WKT 2010 10 17 17 04 55 31.3200 -97.3300 251.000 30.0 142.427 4.680 -999.990 -999.990 1.424 ..P WKT 2010 10 17 17 09 55 31.3200 -97.3300 251.000 122.0 139.732 4.830 -999.990 -999.990 1.397 ..P WKT 2010 10 17 17 14 55 31.3200 -97.3300 251.000 457.0 133.311 6.160 -999.990 -999.990 1.333 ..P WKT 2010 10 17 17 19 55 31.3200 -97.3300 251.000 30.0 135.446 5.070 -999.990 -999.990 1.354 ..P WKT 2010 10 17 17 24 55 31.3200 -97.3300 251.000 122.0 143.656 4.630 -999.990 -999.990 1.437 ..P WKT 2010 10 17 17 29 55 31.3200 -97.3300 251.000 457.0 143.031 5.500 -999.990 -999.990 1.430 ..P WKT 2010 10 17 17 39 55 31.3200 -97.3300 251.000 30.0 145.437 4.690 -999.990 -999.990 1.454 ..P WKT 2010 10 17 17 44 55 31.3200 -97.3300 251.000 122.0 136.452 5.020 -999.990 -999.990 1.365 ..P WKT 2010 10 17 17 49 55 31.3200 -97.3300 251.000 457.0 145.697 5.380 -999.990 -999.990 1.457 ..P WKT 2010 10 17 17 54 55 31.3200 -97.3300 251.000 30.0 144.170 5.240 -999.990 -999.990 1.442 ..P WKT 2010 10 17 17 59 55 31.3200 -97.3300 251.000 122.0 146.786 5.530 -999.990 -999.990 1.468 ..P WKT 2010 10 17 18 04 55 31.3200 -97.3300 251.000 457.0 139.732 4.800 -999.990 -999.990 1.397 ..P WKT 2010 10 17 18 14 55 31.3200 -97.3300 251.000 30.0 138.728 7.260 -999.990 -999.990 1.387 ..P WKT 2010 10 17 18 19 55 31.3200 -97.3300 251.000 122.0 151.276 5.370 -999.990 -999.990 1.513 ..P WKT 2010 10 17 18 24 55 31.3200 -97.3300 251.000 457.0 141.711 5.690 -999.990 -999.990 1.417 ..P WKT 2010 10 17 18 29 55 31.3200 -97.3300 251.000 30.0 145.416 4.830 -999.990 -999.990 1.454 ..P WKT 2010 10 17 18 34 55 31.3200 -97.3300 251.000 122.0 147.186 4.720 -999.990 -999.990 1.472 ..P WKT 2010 10 17 18 39 55 31.3200 -97.3300 251.000 457.0 145.914 5.050 -999.990 -999.990 1.459 ..P WKT 2010 10 17 18 49 55 31.3200 -97.3300 251.000 30.0 150.363 4.640 -999.990 -999.990 1.504 ..P WKT 2010 10 17 18 54 55 31.3200 -97.3300 251.000 122.0 150.830 4.820 -999.990 -999.990 1.508 ..P WKT 2010 10 17 18 59 55 31.3200 -97.3300 251.000 457.0 151.020 4.810 -999.990 -999.990 1.510 ..P WKT 2010 10 17 19 04 55 31.3200 -97.3300 251.000 30.0 139.866 5.440 -999.990 -999.990 1.399 ..P WKT 2010 10 17 19 09 55 31.3200 -97.3300 251.000 122.0 150.848 4.790 -999.990 -999.990 1.508 ..P WKT 2010 10 17 19 14 55 31.3200 -97.3300 251.000 457.0 149.655 4.770 -999.990 -999.990 1.497 ..P WKT 2010 10 17 19 24 55 31.3200 -97.3300 251.000 30.0 140.861 5.190 -999.990 -999.990 1.409 ..P WKT 2010 10 17 19 29 55 31.3200 -97.3300 251.000 122.0 137.688 4.690 -999.990 -999.990 1.377 ..P WKT 2010 10 17 19 34 55 31.3200 -97.3300 251.000 457.0 140.883 4.980 -999.990 -999.990 1.409 ..P WKT 2010 10 17 19 39 55 31.3200 -97.3300 251.000 30.0 138.264 4.960 -999.990 -999.990 1.383 ..P WKT 2010 10 17 19 44 55 31.3200 -97.3300 251.000 122.0 143.398 5.390 -999.990 -999.990 1.434 ..P WKT 2010 10 17 19 49 55 31.3200 -97.3300 251.000 457.0 136.071 5.420 -999.990 -999.990 1.361 ..P WKT 2010 10 17 19 59 55 31.3200 -97.3300 251.000 30.0 134.885 4.880 -999.990 -999.990 1.349 ..P WKT 2010 10 17 20 04 55 31.3200 -97.3300 251.000 122.0 137.983 4.620 -999.990 -999.990 1.380 ..P WKT 2010 10 17 20 09 55 31.3200 -97.3300 251.000 457.0 133.184 5.260 -999.990 -999.990 1.332 ..P WKT 2010 10 17 20 14 55 31.3200 -97.3300 251.000 30.0 130.463 5.370 -999.990 -999.990 1.305 ..P WKT 2010 10 17 20 19 55 31.3200 -97.3300 251.000 122.0 134.393 5.530 -999.990 -999.990 1.344 ..P WKT 2010 10 17 20 24 55 31.3200 -97.3300 251.000 457.0 132.364 4.180 -999.990 -999.990 1.324 ..P WKT 2010 10 17 20 34 55 31.3200 -97.3300 251.000 30.0 135.653 4.540 -999.990 -999.990 1.357 ..P WKT 2010 10 17 20 39 55 31.3200 -97.3300 251.000 122.0 141.526 4.690 -999.990 -999.990 1.415 ..P WKT 2010 10 17 20 44 55 31.3200 -97.3300 251.000 457.0 144.072 5.230 -999.990 -999.990 1.441 ..P WKT 2010 10 17 20 49 55 31.3200 -97.3300 251.000 30.0 138.716 5.500 -999.990 -999.990 1.387 ..P WKT 2010 10 17 20 54 55 31.3200 -97.3300 251.000 122.0 150.000 5.170 -999.990 -999.990 1.500 ..P WKT 2010 10 17 20 59 55 31.3200 -97.3300 251.000 457.0 141.730 4.990 -999.990 -999.990 1.417 ..P WKT 2010 10 17 21 09 55 31.3200 -97.3300 251.000 30.0 139.256 4.770 -999.990 -999.990 1.393 ..P WKT 2010 10 17 21 14 55 31.3200 -97.3300 251.000 122.0 143.251 5.310 -999.990 -999.990 1.433 ..P WKT 2010 10 17 21 19 55 31.3200 -97.3300 251.000 457.0 143.778 5.520 -999.990 -999.990 1.438 ..P WKT 2010 10 17 21 24 55 31.3200 -97.3300 251.000 30.0 137.505 4.920 -999.990 -999.990 1.375 ..P WKT 2010 10 17 21 29 55 31.3200 -97.3300 251.000 122.0 143.166 5.240 -999.990 -999.990 1.432 ..P WKT 2010 10 17 21 34 55 31.3200 -97.3300 251.000 457.0 138.142 4.070 -999.990 -999.990 1.381 ..P WKT 2010 10 17 21 44 55 31.3200 -97.3300 251.000 30.0 139.711 4.120 -999.990 -999.990 1.397 ..P WKT 2010 10 17 21 49 55 31.3200 -97.3300 251.000 122.0 142.281 4.260 -999.990 -999.990 1.423 ..P WKT 2010 10 17 21 54 55 31.3200 -97.3300 251.000 457.0 136.520 4.360 -999.990 -999.990 1.365 ..P WKT 2010 10 17 21 59 55 31.3200 -97.3300 251.000 30.0 135.757 3.980 -999.990 -999.990 1.358 ..P WKT 2010 10 17 22 04 55 31.3200 -97.3300 251.000 122.0 143.328 4.120 -999.990 -999.990 1.433 ..P WKT 2010 10 17 22 09 55 31.3200 -97.3300 251.000 457.0 138.954 4.660 -999.990 -999.990 1.390 ..P WKT 2010 10 17 22 19 55 31.3200 -97.3300 251.000 30.0 135.125 3.950 -999.990 -999.990 1.351 ..P WKT 2010 10 17 22 24 55 31.3200 -97.3300 251.000 122.0 131.503 4.520 -999.990 -999.990 1.315 ..P WKT 2010 10 17 22 29 55 31.3200 -97.3300 251.000 457.0 133.995 4.330 -999.990 -999.990 1.340 ..P WKT 2010 10 17 22 34 55 31.3200 -97.3300 251.000 30.0 132.874 4.130 -999.990 -999.990 1.329 ..P WKT 2010 10 17 22 39 55 31.3200 -97.3300 251.000 122.0 135.645 5.630 -999.990 -999.990 1.356 ..P WKT 2010 10 17 22 44 55 31.3200 -97.3300 251.000 457.0 137.304 5.000 -999.990 -999.990 1.373 ..P WKT 2010 10 17 22 54 55 31.3200 -97.3300 251.000 30.0 140.107 4.840 -999.990 -999.990 1.401 ..P WKT 2010 10 17 22 59 55 31.3200 -97.3300 251.000 122.0 137.913 4.870 -999.990 -999.990 1.379 ..P WKT 2010 10 17 23 04 55 31.3200 -97.3300 251.000 457.0 136.275 4.530 -999.990 -999.990 1.363 ..P WKT 2010 10 17 23 09 55 31.3200 -97.3300 251.000 30.0 136.862 4.740 -999.990 -999.990 1.369 ..P WKT 2010 10 17 23 14 55 31.3200 -97.3300 251.000 122.0 138.562 4.560 -999.990 -999.990 1.386 ..P WKT 2010 10 17 23 19 55 31.3200 -97.3300 251.000 457.0 139.985 4.550 -999.990 -999.990 1.400 ..P WKT 2010 10 17 23 29 55 31.3200 -97.3300 251.000 30.0 138.759 4.960 -999.990 -999.990 1.388 ..P WKT 2010 10 17 23 34 55 31.3200 -97.3300 251.000 122.0 146.410 4.300 -999.990 -999.990 1.464 ..P WKT 2010 10 17 23 39 55 31.3200 -97.3300 251.000 457.0 143.206 4.250 -999.990 -999.990 1.432 ..P WKT 2010 10 17 23 44 55 31.3200 -97.3300 251.000 30.0 149.467 4.550 -999.990 -999.990 1.495 ..P WKT 2010 10 17 23 49 55 31.3200 -97.3300 251.000 122.0 149.603 3.830 -999.990 -999.990 1.496 ..P WKT 2010 10 18 00 09 55 31.3200 -97.3300 251.000 457.0 143.061 3.540 -999.990 -999.990 1.431 ..P WKT 2010 10 18 00 10 25 31.3200 -97.3300 251.000 457.0 140.438 4.050 -999.990 -999.990 1.404 ..P WKT 2010 10 18 00 10 55 31.3200 -97.3300 251.000 457.0 139.624 3.750 -999.990 -999.990 1.396 ..P WKT 2010 10 18 00 11 25 31.3200 -97.3300 251.000 457.0 144.519 3.820 -999.990 -999.990 1.445 ..P WKT 2010 10 18 00 11 55 31.3200 -97.3300 251.000 457.0 142.035 3.850 -999.990 -999.990 1.420 ..P WKT 2010 10 18 00 12 25 31.3200 -97.3300 251.000 457.0 138.436 3.980 -999.990 -999.990 1.384 ..P WKT 2010 10 18 00 12 55 31.3200 -97.3300 251.000 457.0 142.078 4.030 -999.990 -999.990 1.421 ..P WKT 2010 10 18 00 13 25 31.3200 -97.3300 251.000 457.0 137.227 4.300 -999.990 -999.990 1.372 ..P WKT 2010 10 18 00 13 55 31.3200 -97.3300 251.000 457.0 139.476 3.510 -999.990 -999.990 1.395 ..P WKT 2010 10 18 00 14 25 31.3200 -97.3300 251.000 457.0 140.055 3.610 -999.990 -999.990 1.401 ..P WKT 2010 10 18 00 14 55 31.3200 -97.3300 251.000 457.0 139.520 3.800 -999.990 -999.990 1.395 ..P WKT 2010 10 18 00 19 55 31.3200 -97.3300 251.000 30.0 147.253 4.060 -999.990 -999.990 1.473 ..P WKT 2010 10 18 00 24 55 31.3200 -97.3300 251.000 122.0 138.980 3.640 -999.990 -999.990 1.390 ..P WKT 2010 10 18 00 29 55 31.3200 -97.3300 251.000 457.0 138.779 3.740 -999.990 -999.990 1.388 ..P WKT 2010 10 18 00 34 55 31.3200 -97.3300 251.000 30.0 147.066 3.880 -999.990 -999.990 1.471 ..P WKT 2010 10 18 00 39 55 31.3200 -97.3300 251.000 122.0 143.944 4.160 -999.990 -999.990 1.439 ..P WKT 2010 10 18 00 44 55 31.3200 -97.3300 251.000 457.0 137.761 3.760 -999.990 -999.990 1.378 ..P WKT 2010 10 18 00 54 55 31.3200 -97.3300 251.000 30.0 140.388 4.040 -999.990 -999.990 1.404 ..P WKT 2010 10 18 00 59 55 31.3200 -97.3300 251.000 122.0 137.234 3.710 -999.990 -999.990 1.372 ..P WKT 2010 10 18 01 04 55 31.3200 -97.3300 251.000 457.0 137.002 4.460 -999.990 -999.990 1.370 ..P WKT 2010 10 18 01 09 55 31.3200 -97.3300 251.000 30.0 134.961 4.060 -999.990 -999.990 1.350 ..P WKT 2010 10 18 01 14 55 31.3200 -97.3300 251.000 122.0 142.652 4.640 -999.990 -999.990 1.427 ..P WKT 2010 10 18 01 19 55 31.3200 -97.3300 251.000 457.0 135.469 4.040 -999.990 -999.990 1.355 ..P WKT 2010 10 18 01 29 55 31.3200 -97.3300 251.000 30.0 139.668 4.330 -999.990 -999.990 1.397 ..P WKT 2010 10 18 01 34 55 31.3200 -97.3300 251.000 122.0 144.933 4.480 -999.990 -999.990 1.449 ..P WKT 2010 10 18 01 39 55 31.3200 -97.3300 251.000 457.0 142.556 4.320 -999.990 -999.990 1.426 ..P WKT 2010 10 18 01 44 55 31.3200 -97.3300 251.000 30.0 140.318 4.360 -999.990 -999.990 1.403 ..P WKT 2010 10 18 01 49 55 31.3200 -97.3300 251.000 122.0 142.803 4.200 -999.990 -999.990 1.428 ..P WKT 2010 10 18 01 54 55 31.3200 -97.3300 251.000 457.0 147.371 3.720 -999.990 -999.990 1.474 ..P WKT 2010 10 18 02 04 55 31.3200 -97.3300 251.000 30.0 143.373 3.540 -999.990 -999.990 1.434 ..P WKT 2010 10 18 02 09 55 31.3200 -97.3300 251.000 122.0 132.173 3.910 -999.990 -999.990 1.322 ..P WKT 2010 10 18 02 14 55 31.3200 -97.3300 251.000 457.0 139.020 4.560 -999.990 -999.990 1.390 ..P WKT 2010 10 18 02 19 55 31.3200 -97.3300 251.000 30.0 135.317 5.510 -999.990 -999.990 1.353 ..P WKT 2010 10 18 02 24 55 31.3200 -97.3300 251.000 122.0 133.004 4.640 -999.990 -999.990 1.330 ..P WKT 2010 10 18 02 29 55 31.3200 -97.3300 251.000 457.0 132.911 4.580 -999.990 -999.990 1.329 ..P WKT 2010 10 18 02 39 55 31.3200 -97.3300 251.000 30.0 133.437 4.300 -999.990 -999.990 1.334 ..P WKT 2010 10 18 02 44 55 31.3200 -97.3300 251.000 122.0 139.329 4.940 -999.990 -999.990 1.393 ..P WKT 2010 10 18 02 49 55 31.3200 -97.3300 251.000 457.0 138.839 4.980 -999.990 -999.990 1.388 ..P WKT 2010 10 18 02 54 55 31.3200 -97.3300 251.000 30.0 135.852 5.100 -999.990 -999.990 1.359 ..P WKT 2010 10 18 02 59 55 31.3200 -97.3300 251.000 122.0 141.463 4.570 -999.990 -999.990 1.415 ..P WKT 2010 10 18 03 04 55 31.3200 -97.3300 251.000 457.0 135.982 4.010 -999.990 -999.990 1.360 ..P WKT 2010 10 18 03 14 55 31.3200 -97.3300 251.000 30.0 139.676 4.140 -999.990 -999.990 1.397 ..P WKT 2010 10 18 03 19 55 31.3200 -97.3300 251.000 122.0 136.374 4.450 -999.990 -999.990 1.364 ..P WKT 2010 10 18 03 24 55 31.3200 -97.3300 251.000 457.0 131.965 4.890 -999.990 -999.990 1.320 ..P WKT 2010 10 18 03 29 55 31.3200 -97.3300 251.000 30.0 138.364 4.800 -999.990 -999.990 1.384 ..P WKT 2010 10 18 03 34 55 31.3200 -97.3300 251.000 122.0 132.016 6.570 -999.990 -999.990 1.320 ..P WKT 2010 10 18 03 39 55 31.3200 -97.3300 251.000 457.0 127.055 4.160 -999.990 -999.990 1.271 ..P WKT 2010 10 18 03 49 55 31.3200 -97.3300 251.000 30.0 143.233 4.420 -999.990 -999.990 1.432 ..P WKT 2010 10 18 03 54 55 31.3200 -97.3300 251.000 122.0 138.470 4.280 -999.990 -999.990 1.385 ..P WKT 2010 10 18 03 59 55 31.3200 -97.3300 251.000 457.0 134.122 4.870 -999.990 -999.990 1.341 ..P WKT 2010 10 18 04 04 55 31.3200 -97.3300 251.000 30.0 147.498 4.880 -999.990 -999.990 1.475 ..P WKT 2010 10 18 04 09 55 31.3200 -97.3300 251.000 122.0 137.338 4.380 -999.990 -999.990 1.373 ..P WKT 2010 10 18 04 14 55 31.3200 -97.3300 251.000 457.0 135.484 3.930 -999.990 -999.990 1.355 ..P WKT 2010 10 18 04 24 55 31.3200 -97.3300 251.000 30.0 142.296 4.370 -999.990 -999.990 1.423 ..P WKT 2010 10 18 04 29 55 31.3200 -97.3300 251.000 122.0 142.518 3.920 -999.990 -999.990 1.425 ..P WKT 2010 10 18 04 34 55 31.3200 -97.3300 251.000 457.0 127.522 5.430 -999.990 -999.990 1.275 ..P WKT 2010 10 18 04 39 55 31.3200 -97.3300 251.000 30.0 143.101 3.770 -999.990 -999.990 1.431 ..P WKT 2010 10 18 04 44 55 31.3200 -97.3300 251.000 122.0 138.758 4.030 -999.990 -999.990 1.388 ..P WKT 2010 10 18 04 49 55 31.3200 -97.3300 251.000 457.0 137.598 4.010 -999.990 -999.990 1.376 ..P WKT 2010 10 18 05 04 55 31.3200 -97.3300 251.000 30.0 136.478 4.010 -999.990 -999.990 1.365 ..P WKT 2010 10 18 05 09 55 31.3200 -97.3300 251.000 122.0 134.908 4.940 -999.990 -999.990 1.349 ..P WKT 2010 10 18 05 14 55 31.3200 -97.3300 251.000 457.0 130.022 5.700 -999.990 -999.990 1.300 ..P WKT 2010 10 18 05 19 55 31.3200 -97.3300 251.000 30.0 130.941 5.600 -999.990 -999.990 1.309 ..P WKT 2010 10 18 05 24 55 31.3200 -97.3300 251.000 122.0 137.802 5.110 -999.990 -999.990 1.378 ..P WKT 2010 10 18 05 29 55 31.3200 -97.3300 251.000 457.0 126.423 3.940 -999.990 -999.990 1.264 ..P WKT 2010 10 18 05 39 55 31.3200 -97.3300 251.000 30.0 131.887 4.190 -999.990 -999.990 1.319 ..P WKT 2010 10 18 05 44 55 31.3200 -97.3300 251.000 122.0 130.493 6.130 -999.990 -999.990 1.305 ..P WKT 2010 10 18 05 49 55 31.3200 -97.3300 251.000 457.0 130.894 5.330 -999.990 -999.990 1.309 ..P WKT 2010 10 18 05 54 55 31.3200 -97.3300 251.000 30.0 140.132 5.170 -999.990 -999.990 1.401 ..P WKT 2010 10 18 05 59 55 31.3200 -97.3300 251.000 122.0 129.209 5.340 -999.990 -999.990 1.292 ..P WKT 2010 10 18 06 04 55 31.3200 -97.3300 251.000 457.0 134.856 4.510 -999.990 -999.990 1.349 ..P WKT 2010 10 18 06 14 55 31.3200 -97.3300 251.000 30.0 136.740 3.970 -999.990 -999.990 1.367 ..P WKT 2010 10 18 06 19 55 31.3200 -97.3300 251.000 122.0 136.568 4.940 -999.990 -999.990 1.366 ..P WKT 2010 10 18 06 24 55 31.3200 -97.3300 251.000 457.0 137.500 5.780 -999.990 -999.990 1.375 ..P WKT 2010 10 18 06 29 55 31.3200 -97.3300 251.000 30.0 131.809 5.010 -999.990 -999.990 1.318 ..P WKT 2010 10 18 06 34 55 31.3200 -97.3300 251.000 122.0 125.567 4.580 -999.990 -999.990 1.256 ..P WKT 2010 10 18 06 39 55 31.3200 -97.3300 251.000 457.0 122.085 3.730 -999.990 -999.990 1.221 ..P WKT 2010 10 18 06 49 55 31.3200 -97.3300 251.000 30.0 134.946 4.230 -999.990 -999.990 1.349 ..P WKT 2010 10 18 06 54 55 31.3200 -97.3300 251.000 122.0 136.941 4.750 -999.990 -999.990 1.369 ..P WKT 2010 10 18 06 59 55 31.3200 -97.3300 251.000 457.0 130.663 5.180 -999.990 -999.990 1.307 ..P WKT 2010 10 18 07 04 55 31.3200 -97.3300 251.000 30.0 133.486 4.960 -999.990 -999.990 1.335 ..P WKT 2010 10 18 07 09 55 31.3200 -97.3300 251.000 122.0 135.756 5.110 -999.990 -999.990 1.358 ..P WKT 2010 10 18 07 14 55 31.3200 -97.3300 251.000 457.0 131.409 4.510 -999.990 -999.990 1.314 ..P WKT 2010 10 18 07 24 55 31.3200 -97.3300 251.000 30.0 127.209 4.380 -999.990 -999.990 1.272 ..P WKT 2010 10 18 07 29 55 31.3200 -97.3300 251.000 122.0 133.140 4.930 -999.990 -999.990 1.331 ..P WKT 2010 10 18 07 34 55 31.3200 -97.3300 251.000 457.0 127.773 4.970 -999.990 -999.990 1.278 ..P WKT 2010 10 18 07 39 55 31.3200 -97.3300 251.000 30.0 127.641 4.850 -999.990 -999.990 1.276 ..P WKT 2010 10 18 07 44 55 31.3200 -97.3300 251.000 122.0 131.642 4.370 -999.990 -999.990 1.316 ..P WKT 2010 10 18 07 49 55 31.3200 -97.3300 251.000 457.0 134.816 4.040 -999.990 -999.990 1.348 ..P WKT 2010 10 18 07 59 55 31.3200 -97.3300 251.000 30.0 127.982 4.160 -999.990 -999.990 1.280 ..P WKT 2010 10 18 08 04 55 31.3200 -97.3300 251.000 122.0 127.752 5.410 -999.990 -999.990 1.278 ..P WKT 2010 10 18 08 09 55 31.3200 -97.3300 251.000 457.0 123.805 4.890 -999.990 -999.990 1.238 ..P WKT 2010 10 18 08 14 55 31.3200 -97.3300 251.000 30.0 126.054 4.970 -999.990 -999.990 1.261 ..P WKT 2010 10 18 08 19 55 31.3200 -97.3300 251.000 122.0 126.099 5.140 -999.990 -999.990 1.261 ..P WKT 2010 10 18 08 24 55 31.3200 -97.3300 251.000 457.0 130.549 4.810 -999.990 -999.990 1.305 ..P WKT 2010 10 18 08 34 55 31.3200 -97.3300 251.000 30.0 132.900 4.040 -999.990 -999.990 1.329 ..P WKT 2010 10 18 08 39 55 31.3200 -97.3300 251.000 122.0 132.316 5.440 -999.990 -999.990 1.323 ..P WKT 2010 10 18 08 44 55 31.3200 -97.3300 251.000 457.0 133.521 5.240 -999.990 -999.990 1.335 ..P WKT 2010 10 18 08 49 55 31.3200 -97.3300 251.000 30.0 127.435 4.870 -999.990 -999.990 1.274 ..P WKT 2010 10 18 08 54 55 31.3200 -97.3300 251.000 122.0 134.554 4.100 -999.990 -999.990 1.346 ..P WKT 2010 10 18 08 59 55 31.3200 -97.3300 251.000 457.0 124.345 4.320 -999.990 -999.990 1.243 ..P WKT 2010 10 18 09 09 55 31.3200 -97.3300 251.000 30.0 126.303 4.940 -999.990 -999.990 1.263 ..P WKT 2010 10 18 09 14 55 31.3200 -97.3300 251.000 122.0 127.605 3.910 -999.990 -999.990 1.276 ..P WKT 2010 10 18 09 19 55 31.3200 -97.3300 251.000 457.0 117.363 4.100 -999.990 -999.990 1.174 ..P WKT 2010 10 18 09 24 55 31.3200 -97.3300 251.000 30.0 132.546 4.530 -999.990 -999.990 1.325 ..P WKT 2010 10 18 09 29 55 31.3200 -97.3300 251.000 122.0 127.389 4.070 -999.990 -999.990 1.274 ..P WKT 2010 10 18 09 34 55 31.3200 -97.3300 251.000 457.0 121.410 3.560 -999.990 -999.990 1.214 ..P WKT 2010 10 18 09 44 55 31.3200 -97.3300 251.000 30.0 124.328 3.800 -999.990 -999.990 1.243 ..P WKT 2010 10 18 09 49 55 31.3200 -97.3300 251.000 122.0 133.634 4.430 -999.990 -999.990 1.336 ..P WKT 2010 10 18 09 54 55 31.3200 -97.3300 251.000 457.0 132.228 4.480 -999.990 -999.990 1.322 ..P WKT 2010 10 18 09 59 55 31.3200 -97.3300 251.000 30.0 122.857 4.240 -999.990 -999.990 1.229 ..P WKT 2010 10 18 10 04 55 31.3200 -97.3300 251.000 122.0 125.845 4.610 -999.990 -999.990 1.258 ..P WKT 2010 10 18 10 09 55 31.3200 -97.3300 251.000 457.0 120.596 4.910 -999.990 -999.990 1.206 ..P WKT 2010 10 18 10 19 55 31.3200 -97.3300 251.000 30.0 124.473 4.990 -999.990 -999.990 1.245 ..P WKT 2010 10 18 10 24 55 31.3200 -97.3300 251.000 122.0 127.832 6.030 -999.990 -999.990 1.278 ..P WKT 2010 10 18 10 29 55 31.3200 -97.3300 251.000 457.0 124.878 4.280 -999.990 -999.990 1.249 ..P WKT 2010 10 18 10 34 55 31.3200 -97.3300 251.000 30.0 123.298 5.430 -999.990 -999.990 1.233 ..P WKT 2010 10 18 10 39 55 31.3200 -97.3300 251.000 122.0 132.417 4.150 -999.990 -999.990 1.324 ..P WKT 2010 10 18 10 44 55 31.3200 -97.3300 251.000 457.0 122.605 4.630 -999.990 -999.990 1.226 ..P WKT 2010 10 18 10 54 55 31.3200 -97.3300 251.000 30.0 131.279 3.670 -999.990 -999.990 1.313 ..P WKT 2010 10 18 10 59 55 31.3200 -97.3300 251.000 122.0 123.430 3.880 -999.990 -999.990 1.234 ..P WKT 2010 10 18 11 04 55 31.3200 -97.3300 251.000 457.0 121.341 4.230 -999.990 -999.990 1.213 ..P WKT 2010 10 18 11 09 55 31.3200 -97.3300 251.000 30.0 126.381 4.260 -999.990 -999.990 1.264 ..P WKT 2010 10 18 11 14 55 31.3200 -97.3300 251.000 122.0 126.485 5.160 -999.990 -999.990 1.265 ..P WKT 2010 10 18 11 19 55 31.3200 -97.3300 251.000 457.0 121.656 4.890 -999.990 -999.990 1.217 ..P WKT 2010 10 18 11 29 55 31.3200 -97.3300 251.000 30.0 124.300 5.560 -999.990 -999.990 1.243 ..P WKT 2010 10 18 11 34 55 31.3200 -97.3300 251.000 122.0 129.580 4.960 -999.990 -999.990 1.296 ..P WKT 2010 10 18 11 39 55 31.3200 -97.3300 251.000 457.0 124.994 4.700 -999.990 -999.990 1.250 ..P WKT 2010 10 18 11 44 55 31.3200 -97.3300 251.000 30.0 121.916 4.270 -999.990 -999.990 1.219 ..P WKT 2010 10 18 11 49 55 31.3200 -97.3300 251.000 122.0 130.891 4.240 -999.990 -999.990 1.309 ..P WKT 2010 10 18 12 09 55 31.3200 -97.3300 251.000 457.0 133.650 3.920 -999.990 -999.990 1.337 ..P WKT 2010 10 18 12 10 25 31.3200 -97.3300 251.000 457.0 135.783 3.730 -999.990 -999.990 1.358 ..P WKT 2010 10 18 12 10 55 31.3200 -97.3300 251.000 457.0 127.647 5.210 -999.990 -999.990 1.276 ..P WKT 2010 10 18 12 11 25 31.3200 -97.3300 251.000 457.0 124.577 3.950 -999.990 -999.990 1.246 ..P WKT 2010 10 18 12 11 55 31.3200 -97.3300 251.000 457.0 126.437 3.820 -999.990 -999.990 1.264 ..P WKT 2010 10 18 12 12 25 31.3200 -97.3300 251.000 457.0 124.736 3.650 -999.990 -999.990 1.247 ..P WKT 2010 10 18 12 12 55 31.3200 -97.3300 251.000 457.0 127.965 4.950 -999.990 -999.990 1.280 ..P WKT 2010 10 18 12 13 25 31.3200 -97.3300 251.000 457.0 128.592 4.560 -999.990 -999.990 1.286 ..P WKT 2010 10 18 12 13 55 31.3200 -97.3300 251.000 457.0 126.618 3.770 -999.990 -999.990 1.266 ..P WKT 2010 10 18 12 14 25 31.3200 -97.3300 251.000 457.0 126.013 3.790 -999.990 -999.990 1.260 ..P WKT 2010 10 18 12 14 55 31.3200 -97.3300 251.000 457.0 128.146 3.890 -999.990 -999.990 1.281 ..P WKT 2010 10 18 12 19 55 31.3200 -97.3300 251.000 30.0 126.065 4.220 -999.990 -999.990 1.261 ..P WKT 2010 10 18 12 24 55 31.3200 -97.3300 251.000 122.0 128.777 4.160 -999.990 -999.990 1.288 ..P WKT 2010 10 18 12 29 55 31.3200 -97.3300 251.000 457.0 129.845 5.400 -999.990 -999.990 1.298 ..P WKT 2010 10 18 12 34 55 31.3200 -97.3300 251.000 30.0 126.122 4.310 -999.990 -999.990 1.261 ..P WKT 2010 10 18 12 39 55 31.3200 -97.3300 251.000 122.0 134.857 5.690 -999.990 -999.990 1.349 ..P WKT 2010 10 18 12 44 55 31.3200 -97.3300 251.000 457.0 123.330 5.230 -999.990 -999.990 1.233 ..P WKT 2010 10 18 12 54 55 31.3200 -97.3300 251.000 30.0 137.750 4.640 -999.990 -999.990 1.377 ..P WKT 2010 10 18 12 59 55 31.3200 -97.3300 251.000 122.0 133.166 4.630 -999.990 -999.990 1.332 ..P WKT 2010 10 18 13 04 55 31.3200 -97.3300 251.000 457.0 116.946 4.650 -999.990 -999.990 1.169 ..P WKT 2010 10 18 13 09 55 31.3200 -97.3300 251.000 30.0 140.700 4.500 -999.990 -999.990 1.407 ..P WKT 2010 10 18 13 14 55 31.3200 -97.3300 251.000 122.0 139.676 4.420 -999.990 -999.990 1.397 ..P WKT 2010 10 18 13 19 55 31.3200 -97.3300 251.000 457.0 120.445 4.350 -999.990 -999.990 1.204 ..P WKT 2010 10 18 13 29 55 31.3200 -97.3300 251.000 30.0 139.868 5.400 -999.990 -999.990 1.399 ..P WKT 2010 10 18 13 34 55 31.3200 -97.3300 251.000 122.0 142.110 5.010 -999.990 -999.990 1.421 ..P WKT 2010 10 18 13 39 55 31.3200 -97.3300 251.000 457.0 127.925 5.730 -999.990 -999.990 1.279 ..P WKT 2010 10 18 13 44 55 31.3200 -97.3300 251.000 30.0 144.950 5.250 -999.990 -999.990 1.450 ..P WKT 2010 10 18 13 49 55 31.3200 -97.3300 251.000 122.0 148.013 6.220 -999.990 -999.990 1.480 ..P WKT 2010 10 18 13 54 55 31.3200 -97.3300 251.000 457.0 126.985 5.880 -999.990 -999.990 1.270 ..P WKT 2010 10 18 14 04 55 31.3200 -97.3300 251.000 30.0 136.512 6.150 -999.990 -999.990 1.365 ..P WKT 2010 10 18 14 09 55 31.3200 -97.3300 251.000 122.0 140.239 5.540 -999.990 -999.990 1.402 ..P WKT 2010 10 18 14 14 55 31.3200 -97.3300 251.000 457.0 123.710 5.570 -999.990 -999.990 1.237 ..P WKT 2010 10 18 14 19 55 31.3200 -97.3300 251.000 30.0 141.945 5.190 -999.990 -999.990 1.419 ..P WKT 2010 10 18 14 24 55 31.3200 -97.3300 251.000 122.0 140.471 4.580 -999.990 -999.990 1.405 ..P WKT 2010 10 18 14 29 55 31.3200 -97.3300 251.000 457.0 111.351 4.430 -999.990 -999.990 1.114 ..P WKT 2010 10 18 14 39 55 31.3200 -97.3300 251.000 30.0 139.255 6.590 -999.990 -999.990 1.393 ..P WKT 2010 10 18 14 44 55 31.3200 -97.3300 251.000 122.0 132.777 4.320 -999.990 -999.990 1.328 ..P WKT 2010 10 18 14 49 55 31.3200 -97.3300 251.000 457.0 116.446 4.320 -999.990 -999.990 1.164 ..P WKT 2010 10 18 14 54 55 31.3200 -97.3300 251.000 30.0 125.842 4.490 -999.990 -999.990 1.258 ..P WKT 2010 10 18 14 59 55 31.3200 -97.3300 251.000 122.0 132.775 4.740 -999.990 -999.990 1.328 ..P WKT 2010 10 18 15 04 55 31.3200 -97.3300 251.000 457.0 119.729 4.280 -999.990 -999.990 1.197 ..P WKT 2010 10 18 15 14 55 31.3200 -97.3300 251.000 30.0 124.543 4.470 -999.990 -999.990 1.245 ..P WKT 2010 10 18 15 19 55 31.3200 -97.3300 251.000 122.0 126.256 4.660 -999.990 -999.990 1.263 ..P WKT 2010 10 18 15 24 55 31.3200 -97.3300 251.000 457.0 124.411 4.560 -999.990 -999.990 1.244 ..P WKT 2010 10 18 15 29 55 31.3200 -97.3300 251.000 30.0 126.945 4.800 -999.990 -999.990 1.269 ..P WKT 2010 10 18 15 34 55 31.3200 -97.3300 251.000 122.0 130.026 4.600 -999.990 -999.990 1.300 ..P WKT 2010 10 18 15 39 55 31.3200 -97.3300 251.000 457.0 121.751 4.570 -999.990 -999.990 1.218 ..P WKT 2010 10 18 15 49 55 31.3200 -97.3300 251.000 30.0 127.347 4.770 -999.990 -999.990 1.273 ..P WKT 2010 10 18 15 54 55 31.3200 -97.3300 251.000 122.0 127.124 5.060 -999.990 -999.990 1.271 ..P WKT 2010 10 18 15 59 55 31.3200 -97.3300 251.000 457.0 122.798 5.030 -999.990 -999.990 1.228 ..P WKT 2010 10 18 16 04 55 31.3200 -97.3300 251.000 30.0 117.104 4.890 -999.990 -999.990 1.171 ..P WKT 2010 10 18 16 09 55 31.3200 -97.3300 251.000 122.0 129.194 4.390 -999.990 -999.990 1.292 ..P WKT 2010 10 18 16 14 55 31.3200 -97.3300 251.000 457.0 129.519 4.760 -999.990 -999.990 1.295 ..P WKT 2010 10 18 16 24 55 31.3200 -97.3300 251.000 30.0 119.948 4.530 -999.990 -999.990 1.199 ..P WKT 2010 10 18 16 29 55 31.3200 -97.3300 251.000 122.0 125.647 4.780 -999.990 -999.990 1.256 ..P WKT 2010 10 18 16 34 55 31.3200 -97.3300 251.000 457.0 131.893 5.110 -999.990 -999.990 1.319 ..P WKT 2010 10 18 16 39 55 31.3200 -97.3300 251.000 30.0 133.215 4.790 -999.990 -999.990 1.332 ..P WKT 2010 10 18 16 44 55 31.3200 -97.3300 251.000 122.0 133.032 5.580 -999.990 -999.990 1.330 ..P WKT 2010 10 18 16 49 55 31.3200 -97.3300 251.000 457.0 130.250 5.230 -999.990 -999.990 1.302 ..P WKT 2010 10 18 17 04 55 31.3200 -97.3300 251.000 30.0 123.926 5.380 -999.990 -999.990 1.239 ..P WKT 2010 10 18 17 09 55 31.3200 -97.3300 251.000 122.0 128.790 5.640 -999.990 -999.990 1.288 ..P WKT 2010 10 18 17 14 55 31.3200 -97.3300 251.000 457.0 128.318 6.400 -999.990 -999.990 1.283 ..P WKT 2010 10 18 17 19 55 31.3200 -97.3300 251.000 30.0 115.402 5.770 -999.990 -999.990 1.154 ..P WKT 2010 10 18 17 24 55 31.3200 -97.3300 251.000 122.0 128.880 6.050 -999.990 -999.990 1.289 ..P WKT 2010 10 18 17 29 55 31.3200 -97.3300 251.000 457.0 121.982 5.950 -999.990 -999.990 1.220 ..P WKT 2010 10 18 17 39 55 31.3200 -97.3300 251.000 30.0 121.641 5.260 -999.990 -999.990 1.216 ..P WKT 2010 10 18 17 44 55 31.3200 -97.3300 251.000 122.0 127.513 5.230 -999.990 -999.990 1.275 ..P WKT 2010 10 18 17 49 55 31.3200 -97.3300 251.000 457.0 126.276 5.460 -999.990 -999.990 1.263 ..P WKT 2010 10 18 17 54 55 31.3200 -97.3300 251.000 30.0 121.483 5.490 -999.990 -999.990 1.215 ..P WKT 2010 10 18 17 59 55 31.3200 -97.3300 251.000 122.0 122.159 5.590 -999.990 -999.990 1.222 ..P WKT 2010 10 18 18 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 10 18 18 14 55 31.3200 -97.3300 251.000 30.0 124.150 6.610 -999.990 -999.990 1.242 ..P WKT 2010 10 18 18 19 55 31.3200 -97.3300 251.000 122.0 124.788 5.300 -999.990 -999.990 1.248 ..P WKT 2010 10 18 18 24 55 31.3200 -97.3300 251.000 457.0 116.949 5.910 -999.990 -999.990 1.169 ..P WKT 2010 10 18 18 29 55 31.3200 -97.3300 251.000 30.0 127.430 5.340 -999.990 -999.990 1.274 ..P WKT 2010 10 18 18 34 55 31.3200 -97.3300 251.000 122.0 128.067 5.940 -999.990 -999.990 1.281 ..P WKT 2010 10 18 18 39 55 31.3200 -97.3300 251.000 457.0 129.798 5.590 -999.990 -999.990 1.298 ..P WKT 2010 10 18 18 49 55 31.3200 -97.3300 251.000 30.0 123.456 5.420 -999.990 -999.990 1.235 ..P WKT 2010 10 18 18 54 55 31.3200 -97.3300 251.000 122.0 126.593 6.330 -999.990 -999.990 1.266 ..P WKT 2010 10 18 18 59 55 31.3200 -97.3300 251.000 457.0 121.802 5.770 -999.990 -999.990 1.218 ..P WKT 2010 10 18 19 04 55 31.3200 -97.3300 251.000 30.0 115.097 5.790 -999.990 -999.990 1.151 ..P WKT 2010 10 18 19 09 55 31.3200 -97.3300 251.000 122.0 121.514 6.170 -999.990 -999.990 1.215 ..P WKT 2010 10 18 19 14 55 31.3200 -97.3300 251.000 457.0 120.003 6.240 -999.990 -999.990 1.200 ..P WKT 2010 10 18 19 24 55 31.3200 -97.3300 251.000 30.0 116.299 6.840 -999.990 -999.990 1.163 ..P WKT 2010 10 18 19 29 55 31.3200 -97.3300 251.000 122.0 117.660 7.310 -999.990 -999.990 1.177 ..P WKT 2010 10 18 19 34 55 31.3200 -97.3300 251.000 457.0 123.393 6.660 -999.990 -999.990 1.234 ..P WKT 2010 10 18 19 39 55 31.3200 -97.3300 251.000 30.0 121.199 7.540 -999.990 -999.990 1.212 ..P WKT 2010 10 18 19 44 55 31.3200 -97.3300 251.000 122.0 131.442 7.480 -999.990 -999.990 1.314 ..P WKT 2010 10 18 19 49 55 31.3200 -97.3300 251.000 457.0 132.938 7.470 -999.990 -999.990 1.329 ..P WKT 2010 10 18 19 59 55 31.3200 -97.3300 251.000 30.0 125.545 7.100 -999.990 -999.990 1.255 ..P WKT 2010 10 18 20 04 55 31.3200 -97.3300 251.000 122.0 122.258 7.530 -999.990 -999.990 1.223 ..P WKT 2010 10 18 20 09 55 31.3200 -97.3300 251.000 457.0 124.437 6.990 -999.990 -999.990 1.244 ..P WKT 2010 10 18 20 14 55 31.3200 -97.3300 251.000 30.0 133.996 7.200 -999.990 -999.990 1.340 ..P WKT 2010 10 18 20 19 55 31.3200 -97.3300 251.000 122.0 131.939 6.630 -999.990 -999.990 1.319 ..P WKT 2010 10 18 20 24 55 31.3200 -97.3300 251.000 457.0 132.478 6.340 -999.990 -999.990 1.325 ..P WKT 2010 10 18 20 34 55 31.3200 -97.3300 251.000 30.0 135.762 6.470 -999.990 -999.990 1.358 ..P WKT 2010 10 18 20 39 55 31.3200 -97.3300 251.000 122.0 135.638 6.190 -999.990 -999.990 1.356 ..P WKT 2010 10 18 20 44 55 31.3200 -97.3300 251.000 457.0 133.601 6.300 -999.990 -999.990 1.336 ..P WKT 2010 10 18 20 49 55 31.3200 -97.3300 251.000 30.0 126.782 6.350 -999.990 -999.990 1.268 ..P WKT 2010 10 18 20 54 55 31.3200 -97.3300 251.000 122.0 136.221 6.680 -999.990 -999.990 1.362 ..P WKT 2010 10 18 20 59 55 31.3200 -97.3300 251.000 457.0 128.993 6.510 -999.990 -999.990 1.290 ..P WKT 2010 10 18 21 09 55 31.3200 -97.3300 251.000 30.0 120.547 6.260 -999.990 -999.990 1.205 ..P WKT 2010 10 18 21 14 55 31.3200 -97.3300 251.000 122.0 128.210 7.050 -999.990 -999.990 1.282 ..P WKT 2010 10 18 21 19 55 31.3200 -97.3300 251.000 457.0 129.179 6.150 -999.990 -999.990 1.292 ..P WKT 2010 10 18 21 24 55 31.3200 -97.3300 251.000 30.0 118.126 6.260 -999.990 -999.990 1.181 ..P WKT 2010 10 18 21 29 55 31.3200 -97.3300 251.000 122.0 116.909 6.000 -999.990 -999.990 1.169 ..P WKT 2010 10 18 21 34 55 31.3200 -97.3300 251.000 457.0 117.878 5.900 -999.990 -999.990 1.179 ..P WKT 2010 10 18 21 44 55 31.3200 -97.3300 251.000 30.0 120.186 6.070 -999.990 -999.990 1.202 ..P WKT 2010 10 18 21 49 55 31.3200 -97.3300 251.000 122.0 123.165 6.320 -999.990 -999.990 1.232 ..P WKT 2010 10 18 21 54 55 31.3200 -97.3300 251.000 457.0 119.314 6.390 -999.990 -999.990 1.193 ..P WKT 2010 10 18 21 59 55 31.3200 -97.3300 251.000 30.0 118.195 7.160 -999.990 -999.990 1.182 ..P WKT 2010 10 18 22 04 55 31.3200 -97.3300 251.000 122.0 117.622 6.400 -999.990 -999.990 1.176 ..P WKT 2010 10 18 22 09 55 31.3200 -97.3300 251.000 457.0 120.054 6.240 -999.990 -999.990 1.201 ..P WKT 2010 10 18 22 19 55 31.3200 -97.3300 251.000 30.0 119.846 6.810 -999.990 -999.990 1.198 ..P WKT 2010 10 18 22 24 55 31.3200 -97.3300 251.000 122.0 120.209 6.560 -999.990 -999.990 1.202 ..P WKT 2010 10 18 22 29 55 31.3200 -97.3300 251.000 457.0 118.935 7.010 -999.990 -999.990 1.189 ..P WKT 2010 10 18 22 34 55 31.3200 -97.3300 251.000 30.0 113.017 6.930 -999.990 -999.990 1.130 ..P WKT 2010 10 18 22 39 55 31.3200 -97.3300 251.000 122.0 125.397 6.330 -999.990 -999.990 1.254 ..P WKT 2010 10 18 22 44 55 31.3200 -97.3300 251.000 457.0 120.846 6.650 -999.990 -999.990 1.208 ..P WKT 2010 10 18 22 54 55 31.3200 -97.3300 251.000 30.0 123.016 6.570 -999.990 -999.990 1.230 ..P WKT 2010 10 18 22 59 55 31.3200 -97.3300 251.000 122.0 114.447 7.060 -999.990 -999.990 1.144 ..P WKT 2010 10 18 23 04 55 31.3200 -97.3300 251.000 457.0 119.804 7.100 -999.990 -999.990 1.198 ..P WKT 2010 10 18 23 09 55 31.3200 -97.3300 251.000 30.0 109.596 7.410 -999.990 -999.990 1.096 ..P WKT 2010 10 18 23 14 55 31.3200 -97.3300 251.000 122.0 120.687 8.200 -999.990 -999.990 1.207 ..P WKT 2010 10 18 23 19 55 31.3200 -97.3300 251.000 457.0 112.938 8.260 -999.990 -999.990 1.129 ..P WKT 2010 10 18 23 29 55 31.3200 -97.3300 251.000 30.0 115.486 8.610 -999.990 -999.990 1.155 ..P WKT 2010 10 18 23 34 55 31.3200 -97.3300 251.000 122.0 122.644 8.500 -999.990 -999.990 1.226 ..P WKT 2010 10 18 23 39 55 31.3200 -97.3300 251.000 457.0 110.554 7.850 -999.990 -999.990 1.106 ..P WKT 2010 10 18 23 44 55 31.3200 -97.3300 251.000 30.0 116.209 7.680 -999.990 -999.990 1.162 ..P WKT 2010 10 18 23 49 55 31.3200 -97.3300 251.000 122.0 116.405 7.630 -999.990 -999.990 1.164 ..P WKT 2010 10 19 00 09 55 31.3200 -97.3300 251.000 457.0 114.610 7.010 -999.990 -999.990 1.146 ..P WKT 2010 10 19 00 10 25 31.3200 -97.3300 251.000 457.0 114.748 6.910 -999.990 -999.990 1.147 ..P WKT 2010 10 19 00 10 55 31.3200 -97.3300 251.000 457.0 114.885 7.140 -999.990 -999.990 1.149 ..P WKT 2010 10 19 00 11 25 31.3200 -97.3300 251.000 457.0 117.070 6.840 -999.990 -999.990 1.171 ..P WKT 2010 10 19 00 11 55 31.3200 -97.3300 251.000 457.0 117.207 6.960 -999.990 -999.990 1.172 ..P WKT 2010 10 19 00 12 25 31.3200 -97.3300 251.000 457.0 111.885 7.260 -999.990 -999.990 1.119 ..P WKT 2010 10 19 00 12 55 31.3200 -97.3300 251.000 457.0 117.618 7.710 -999.990 -999.990 1.176 ..P WKT 2010 10 19 00 13 25 31.3200 -97.3300 251.000 457.0 114.889 7.100 -999.990 -999.990 1.149 ..P WKT 2010 10 19 00 13 55 31.3200 -97.3300 251.000 457.0 116.664 6.960 -999.990 -999.990 1.167 ..P WKT 2010 10 19 00 14 25 31.3200 -97.3300 251.000 457.0 116.802 6.830 -999.990 -999.990 1.168 ..P WKT 2010 10 19 00 14 55 31.3200 -97.3300 251.000 457.0 113.937 7.080 -999.990 -999.990 1.139 ..P WKT 2010 10 19 00 19 55 31.3200 -97.3300 251.000 30.0 119.950 6.730 -999.990 -999.990 1.200 ..P WKT 2010 10 19 00 24 55 31.3200 -97.3300 251.000 122.0 115.592 6.820 -999.990 -999.990 1.156 ..P WKT 2010 10 19 00 29 55 31.3200 -97.3300 251.000 457.0 109.050 6.710 -999.990 -999.990 1.091 ..P WKT 2010 10 19 00 34 55 31.3200 -97.3300 251.000 30.0 123.250 6.690 -999.990 -999.990 1.232 ..P WKT 2010 10 19 00 39 55 31.3200 -97.3300 251.000 122.0 117.937 7.020 -999.990 -999.990 1.179 ..P WKT 2010 10 19 00 44 55 31.3200 -97.3300 251.000 457.0 109.076 6.770 -999.990 -999.990 1.091 ..P WKT 2010 10 19 00 54 55 31.3200 -97.3300 251.000 30.0 134.882 6.670 -999.990 -999.990 1.349 ..P WKT 2010 10 19 00 59 55 31.3200 -97.3300 251.000 122.0 122.746 7.000 -999.990 -999.990 1.227 ..P WKT 2010 10 19 01 04 55 31.3200 -97.3300 251.000 457.0 111.567 6.650 -999.990 -999.990 1.116 ..P WKT 2010 10 19 01 09 55 31.3200 -97.3300 251.000 30.0 122.490 7.030 -999.990 -999.990 1.225 ..P WKT 2010 10 19 01 14 55 31.3200 -97.3300 251.000 122.0 121.134 6.920 -999.990 -999.990 1.211 ..P WKT 2010 10 19 01 19 55 31.3200 -97.3300 251.000 457.0 117.458 6.430 -999.990 -999.990 1.175 ..P WKT 2010 10 19 01 29 55 31.3200 -97.3300 251.000 30.0 123.770 6.620 -999.990 -999.990 1.238 ..P WKT 2010 10 19 01 34 55 31.3200 -97.3300 251.000 122.0 124.753 6.530 -999.990 -999.990 1.248 ..P WKT 2010 10 19 01 39 55 31.3200 -97.3300 251.000 457.0 118.233 7.030 -999.990 -999.990 1.182 ..P WKT 2010 10 19 01 44 55 31.3200 -97.3300 251.000 30.0 121.263 6.930 -999.990 -999.990 1.213 ..P WKT 2010 10 19 01 49 55 31.3200 -97.3300 251.000 122.0 124.018 6.580 -999.990 -999.990 1.240 ..P WKT 2010 10 19 01 54 55 31.3200 -97.3300 251.000 457.0 117.499 6.500 -999.990 -999.990 1.175 ..P WKT 2010 10 19 02 04 55 31.3200 -97.3300 251.000 30.0 143.761 6.620 -999.990 -999.990 1.438 ..P WKT 2010 10 19 02 09 55 31.3200 -97.3300 251.000 122.0 129.079 6.590 -999.990 -999.990 1.291 ..P WKT 2010 10 19 02 14 55 31.3200 -97.3300 251.000 457.0 116.033 7.070 -999.990 -999.990 1.160 ..P WKT 2010 10 19 02 19 55 31.3200 -97.3300 251.000 30.0 136.810 6.770 -999.990 -999.990 1.368 ..P WKT 2010 10 19 02 24 55 31.3200 -97.3300 251.000 122.0 110.945 7.000 -999.990 -999.990 1.109 ..P WKT 2010 10 19 02 29 55 31.3200 -97.3300 251.000 457.0 117.812 6.920 -999.990 -999.990 1.178 ..P WKT 2010 10 19 02 39 55 31.3200 -97.3300 251.000 30.0 137.348 6.730 -999.990 -999.990 1.373 ..P WKT 2010 10 19 02 44 55 31.3200 -97.3300 251.000 122.0 113.201 6.450 -999.990 -999.990 1.132 ..P WKT 2010 10 19 02 49 55 31.3200 -97.3300 251.000 457.0 112.236 7.200 -999.990 -999.990 1.122 ..P WKT 2010 10 19 02 54 55 31.3200 -97.3300 251.000 30.0 139.905 6.600 -999.990 -999.990 1.399 ..P WKT 2010 10 19 02 59 55 31.3200 -97.3300 251.000 122.0 106.761 6.340 -999.990 -999.990 1.068 ..P WKT 2010 10 19 03 04 55 31.3200 -97.3300 251.000 457.0 103.614 6.390 -999.990 -999.990 1.036 ..P WKT 2010 10 19 03 14 55 31.3200 -97.3300 251.000 30.0 127.821 6.910 -999.990 -999.990 1.278 ..P WKT 2010 10 19 03 19 55 31.3200 -97.3300 251.000 122.0 106.640 6.730 -999.990 -999.990 1.066 ..P WKT 2010 10 19 03 24 55 31.3200 -97.3300 251.000 457.0 105.772 6.360 -999.990 -999.990 1.058 ..P WKT 2010 10 19 03 29 55 31.3200 -97.3300 251.000 30.0 137.486 6.690 -999.990 -999.990 1.375 ..P WKT 2010 10 19 03 34 55 31.3200 -97.3300 251.000 122.0 116.579 6.650 -999.990 -999.990 1.166 ..P WKT 2010 10 19 03 39 55 31.3200 -97.3300 251.000 457.0 110.122 6.640 -999.990 -999.990 1.101 ..P WKT 2010 10 19 03 49 55 31.3200 -97.3300 251.000 30.0 125.387 6.820 -999.990 -999.990 1.254 ..P WKT 2010 10 19 03 54 55 31.3200 -97.3300 251.000 122.0 112.894 6.290 -999.990 -999.990 1.129 ..P WKT 2010 10 19 03 59 55 31.3200 -97.3300 251.000 457.0 108.989 7.150 -999.990 -999.990 1.090 ..P WKT 2010 10 19 04 04 55 31.3200 -97.3300 251.000 30.0 126.755 7.240 -999.990 -999.990 1.268 ..P WKT 2010 10 19 04 09 55 31.3200 -97.3300 251.000 122.0 110.583 6.280 -999.990 -999.990 1.106 ..P WKT 2010 10 19 04 14 55 31.3200 -97.3300 251.000 457.0 115.265 6.330 -999.990 -999.990 1.153 ..P WKT 2010 10 19 04 24 55 31.3200 -97.3300 251.000 30.0 131.831 6.130 -999.990 -999.990 1.318 ..P WKT 2010 10 19 04 29 55 31.3200 -97.3300 251.000 122.0 118.367 6.390 -999.990 -999.990 1.184 ..P WKT 2010 10 19 04 34 55 31.3200 -97.3300 251.000 457.0 107.083 6.410 -999.990 -999.990 1.071 ..P WKT 2010 10 19 04 39 55 31.3200 -97.3300 251.000 30.0 118.832 6.240 -999.990 -999.990 1.188 ..P WKT 2010 10 19 04 44 55 31.3200 -97.3300 251.000 122.0 119.949 6.210 -999.990 -999.990 1.199 ..P WKT 2010 10 19 04 49 55 31.3200 -97.3300 251.000 457.0 107.033 5.920 -999.990 -999.990 1.070 ..P WKT 2010 10 19 05 04 55 31.3200 -97.3300 251.000 30.0 118.387 5.970 -999.990 -999.990 1.184 ..P WKT 2010 10 19 05 09 55 31.3200 -97.3300 251.000 122.0 114.172 6.290 -999.990 -999.990 1.142 ..P WKT 2010 10 19 05 14 55 31.3200 -97.3300 251.000 457.0 106.688 6.400 -999.990 -999.990 1.067 ..P WKT 2010 10 19 05 19 55 31.3200 -97.3300 251.000 30.0 114.871 6.160 -999.990 -999.990 1.149 ..P WKT 2010 10 19 05 24 55 31.3200 -97.3300 251.000 122.0 119.102 6.260 -999.990 -999.990 1.191 ..P WKT 2010 10 19 05 29 55 31.3200 -97.3300 251.000 457.0 108.212 6.110 -999.990 -999.990 1.082 ..P WKT 2010 10 19 05 39 55 31.3200 -97.3300 251.000 30.0 122.378 6.320 -999.990 -999.990 1.224 ..P WKT 2010 10 19 05 44 55 31.3200 -97.3300 251.000 122.0 120.323 6.130 -999.990 -999.990 1.203 ..P WKT 2010 10 19 05 49 55 31.3200 -97.3300 251.000 457.0 109.278 6.200 -999.990 -999.990 1.093 ..P WKT 2010 10 19 05 54 55 31.3200 -97.3300 251.000 30.0 124.387 6.760 -999.990 -999.990 1.244 ..P WKT 2010 10 19 05 59 55 31.3200 -97.3300 251.000 122.0 120.699 6.110 -999.990 -999.990 1.207 ..P WKT 2010 10 19 06 04 55 31.3200 -97.3300 251.000 457.0 110.745 5.840 -999.990 -999.990 1.107 ..P WKT 2010 10 19 06 14 55 31.3200 -97.3300 251.000 30.0 127.611 6.080 -999.990 -999.990 1.276 ..P WKT 2010 10 19 06 19 55 31.3200 -97.3300 251.000 122.0 124.740 5.880 -999.990 -999.990 1.247 ..P WKT 2010 10 19 06 24 55 31.3200 -97.3300 251.000 457.0 110.157 6.060 -999.990 -999.990 1.102 ..P WKT 2010 10 19 06 29 55 31.3200 -97.3300 251.000 30.0 121.449 6.450 -999.990 -999.990 1.214 ..P WKT 2010 10 19 06 34 55 31.3200 -97.3300 251.000 122.0 118.579 6.340 -999.990 -999.990 1.186 ..P WKT 2010 10 19 06 39 55 31.3200 -97.3300 251.000 457.0 111.078 6.490 -999.990 -999.990 1.111 ..P WKT 2010 10 19 06 49 55 31.3200 -97.3300 251.000 30.0 121.872 6.610 -999.990 -999.990 1.219 ..P WKT 2010 10 19 06 54 55 31.3200 -97.3300 251.000 122.0 120.286 6.490 -999.990 -999.990 1.203 ..P WKT 2010 10 19 06 59 55 31.3200 -97.3300 251.000 457.0 111.619 6.580 -999.990 -999.990 1.116 ..P WKT 2010 10 19 07 04 55 31.3200 -97.3300 251.000 30.0 117.385 6.910 -999.990 -999.990 1.174 ..P WKT 2010 10 19 07 09 55 31.3200 -97.3300 251.000 122.0 123.967 7.380 -999.990 -999.990 1.240 ..P WKT 2010 10 19 07 14 55 31.3200 -97.3300 251.000 457.0 111.762 6.910 -999.990 -999.990 1.118 ..P WKT 2010 10 19 07 24 55 31.3200 -97.3300 251.000 30.0 126.948 5.970 -999.990 -999.990 1.269 ..P WKT 2010 10 19 07 29 55 31.3200 -97.3300 251.000 122.0 140.181 6.610 -999.990 -999.990 1.402 ..P WKT 2010 10 19 07 34 55 31.3200 -97.3300 251.000 457.0 108.763 7.870 -999.990 -999.990 1.088 ..P WKT 2010 10 19 07 39 55 31.3200 -97.3300 251.000 30.0 119.954 8.860 -999.990 -999.990 1.200 ..P WKT 2010 10 19 07 44 55 31.3200 -97.3300 251.000 122.0 128.013 7.660 -999.990 -999.990 1.280 ..P WKT 2010 10 19 07 49 55 31.3200 -97.3300 251.000 457.0 101.906 6.590 -999.990 -999.990 1.019 ..P WKT 2010 10 19 07 59 55 31.3200 -97.3300 251.000 30.0 122.554 6.410 -999.990 -999.990 1.226 ..P WKT 2010 10 19 08 04 55 31.3200 -97.3300 251.000 122.0 115.135 7.660 -999.990 -999.990 1.151 ..P WKT 2010 10 19 08 09 55 31.3200 -97.3300 251.000 457.0 99.823 8.750 -999.990 -999.990 0.998 ..P WKT 2010 10 19 08 14 55 31.3200 -97.3300 251.000 30.0 124.796 7.480 -999.990 -999.990 1.248 ..P WKT 2010 10 19 08 19 55 31.3200 -97.3300 251.000 122.0 118.874 6.110 -999.990 -999.990 1.189 ..P WKT 2010 10 19 08 24 55 31.3200 -97.3300 251.000 457.0 109.279 5.890 -999.990 -999.990 1.093 ..P WKT 2010 10 19 08 34 55 31.3200 -97.3300 251.000 30.0 131.439 6.100 -999.990 -999.990 1.314 ..P WKT 2010 10 19 08 39 55 31.3200 -97.3300 251.000 122.0 112.027 6.300 -999.990 -999.990 1.120 ..P WKT 2010 10 19 08 44 55 31.3200 -97.3300 251.000 457.0 110.713 6.650 -999.990 -999.990 1.107 ..P WKT 2010 10 19 08 49 55 31.3200 -97.3300 251.000 30.0 133.757 5.950 -999.990 -999.990 1.338 ..P WKT 2010 10 19 08 54 55 31.3200 -97.3300 251.000 122.0 120.061 5.840 -999.990 -999.990 1.201 ..P WKT 2010 10 19 08 59 55 31.3200 -97.3300 251.000 457.0 103.645 5.720 -999.990 -999.990 1.036 ..P WKT 2010 10 19 09 09 55 31.3200 -97.3300 251.000 30.0 122.049 5.490 -999.990 -999.990 1.220 ..P WKT 2010 10 19 09 14 55 31.3200 -97.3300 251.000 122.0 121.086 5.620 -999.990 -999.990 1.211 ..P WKT 2010 10 19 09 19 55 31.3200 -97.3300 251.000 457.0 97.403 5.310 -999.990 -999.990 0.974 ..P WKT 2010 10 19 09 24 55 31.3200 -97.3300 251.000 30.0 122.832 5.510 -999.990 -999.990 1.228 ..P WKT 2010 10 19 09 29 55 31.3200 -97.3300 251.000 122.0 122.142 8.340 -999.990 -999.990 1.221 ..P WKT 2010 10 19 09 34 55 31.3200 -97.3300 251.000 457.0 105.398 5.610 -999.990 -999.990 1.054 ..P WKT 2010 10 19 09 44 55 31.3200 -97.3300 251.000 30.0 129.395 5.700 -999.990 -999.990 1.294 ..P WKT 2010 10 19 09 49 55 31.3200 -97.3300 251.000 122.0 119.533 5.360 -999.990 -999.990 1.195 ..P WKT 2010 10 19 09 54 55 31.3200 -97.3300 251.000 457.0 113.479 5.430 -999.990 -999.990 1.135 ..P WKT 2010 10 19 09 59 55 31.3200 -97.3300 251.000 30.0 120.754 5.430 -999.990 -999.990 1.208 ..P WKT 2010 10 19 10 04 55 31.3200 -97.3300 251.000 122.0 115.788 5.550 -999.990 -999.990 1.158 ..P WKT 2010 10 19 10 09 55 31.3200 -97.3300 251.000 457.0 105.383 5.580 -999.990 -999.990 1.054 ..P WKT 2010 10 19 10 19 55 31.3200 -97.3300 251.000 30.0 120.166 5.320 -999.990 -999.990 1.202 ..P WKT 2010 10 19 10 24 55 31.3200 -97.3300 251.000 122.0 114.074 5.010 -999.990 -999.990 1.141 ..P WKT 2010 10 19 10 29 55 31.3200 -97.3300 251.000 457.0 109.615 5.110 -999.990 -999.990 1.096 ..P WKT 2010 10 19 10 34 55 31.3200 -97.3300 251.000 30.0 122.017 5.220 -999.990 -999.990 1.220 ..P WKT 2010 10 19 10 39 55 31.3200 -97.3300 251.000 122.0 113.207 5.290 -999.990 -999.990 1.132 ..P WKT 2010 10 19 10 44 55 31.3200 -97.3300 251.000 457.0 106.572 5.240 -999.990 -999.990 1.066 ..P WKT 2010 10 19 10 54 55 31.3200 -97.3300 251.000 30.0 120.477 5.040 -999.990 -999.990 1.205 ..P WKT 2010 10 19 10 59 55 31.3200 -97.3300 251.000 122.0 113.280 5.180 -999.990 -999.990 1.133 ..P WKT 2010 10 19 11 04 55 31.3200 -97.3300 251.000 457.0 106.083 5.650 -999.990 -999.990 1.061 ..P WKT 2010 10 19 11 09 55 31.3200 -97.3300 251.000 30.0 116.560 5.190 -999.990 -999.990 1.166 ..P WKT 2010 10 19 11 14 55 31.3200 -97.3300 251.000 122.0 118.064 5.350 -999.990 -999.990 1.181 ..P WKT 2010 10 19 11 19 55 31.3200 -97.3300 251.000 457.0 107.469 5.220 -999.990 -999.990 1.075 ..P WKT 2010 10 19 11 29 55 31.3200 -97.3300 251.000 30.0 117.308 6.140 -999.990 -999.990 1.173 ..P WKT 2010 10 19 11 34 55 31.3200 -97.3300 251.000 122.0 111.914 5.830 -999.990 -999.990 1.119 ..P WKT 2010 10 19 11 39 55 31.3200 -97.3300 251.000 457.0 102.985 5.220 -999.990 -999.990 1.030 ..P WKT 2010 10 19 11 44 55 31.3200 -97.3300 251.000 30.0 117.300 5.200 -999.990 -999.990 1.173 ..P WKT 2010 10 19 11 49 55 31.3200 -97.3300 251.000 122.0 117.206 5.090 -999.990 -999.990 1.172 ..P WKT 2010 10 19 12 09 55 31.3200 -97.3300 251.000 457.0 113.003 5.110 -999.990 -999.990 1.130 ..P WKT 2010 10 19 12 10 25 31.3200 -97.3300 251.000 457.0 109.189 5.840 -999.990 -999.990 1.092 ..P WKT 2010 10 19 12 10 55 31.3200 -97.3300 251.000 457.0 104.289 4.910 -999.990 -999.990 1.043 ..P WKT 2010 10 19 12 11 25 31.3200 -97.3300 251.000 457.0 111.482 5.780 -999.990 -999.990 1.115 ..P WKT 2010 10 19 12 11 55 31.3200 -97.3300 251.000 457.0 107.262 6.010 -999.990 -999.990 1.073 ..P WKT 2010 10 19 12 12 25 31.3200 -97.3300 251.000 457.0 108.068 4.740 -999.990 -999.990 1.081 ..P WKT 2010 10 19 12 12 55 31.3200 -97.3300 251.000 457.0 106.429 4.880 -999.990 -999.990 1.064 ..P WKT 2010 10 19 12 13 25 31.3200 -97.3300 251.000 457.0 104.925 4.910 -999.990 -999.990 1.049 ..P WKT 2010 10 19 12 13 55 31.3200 -97.3300 251.000 457.0 106.140 4.800 -999.990 -999.990 1.061 ..P WKT 2010 10 19 12 14 25 31.3200 -97.3300 251.000 457.0 108.442 5.690 -999.990 -999.990 1.084 ..P WKT 2010 10 19 12 14 55 31.3200 -97.3300 251.000 457.0 113.461 5.100 -999.990 -999.990 1.135 ..P WKT 2010 10 19 12 19 55 31.3200 -97.3300 251.000 30.0 121.257 4.940 -999.990 -999.990 1.213 ..P WKT 2010 10 19 12 24 55 31.3200 -97.3300 251.000 122.0 112.475 5.150 -999.990 -999.990 1.125 ..P WKT 2010 10 19 12 29 55 31.3200 -97.3300 251.000 457.0 111.032 5.420 -999.990 -999.990 1.110 ..P WKT 2010 10 19 12 34 55 31.3200 -97.3300 251.000 30.0 126.569 5.460 -999.990 -999.990 1.266 ..P WKT 2010 10 19 12 39 55 31.3200 -97.3300 251.000 122.0 115.615 6.200 -999.990 -999.990 1.156 ..P WKT 2010 10 19 12 44 55 31.3200 -97.3300 251.000 457.0 111.455 5.920 -999.990 -999.990 1.115 ..P WKT 2010 10 19 12 54 55 31.3200 -97.3300 251.000 30.0 120.362 5.970 -999.990 -999.990 1.204 ..P WKT 2010 10 19 12 59 55 31.3200 -97.3300 251.000 122.0 111.428 5.950 -999.990 -999.990 1.114 ..P WKT 2010 10 19 13 04 55 31.3200 -97.3300 251.000 457.0 102.087 5.890 -999.990 -999.990 1.021 ..P WKT 2010 10 19 13 09 55 31.3200 -97.3300 251.000 30.0 116.918 5.100 -999.990 -999.990 1.169 ..P WKT 2010 10 19 13 14 55 31.3200 -97.3300 251.000 122.0 106.628 5.010 -999.990 -999.990 1.066 ..P WKT 2010 10 19 13 19 55 31.3200 -97.3300 251.000 457.0 109.915 4.810 -999.990 -999.990 1.099 ..P WKT 2010 10 19 13 29 55 31.3200 -97.3300 251.000 30.0 119.050 5.390 -999.990 -999.990 1.190 ..P WKT 2010 10 19 13 34 55 31.3200 -97.3300 251.000 122.0 108.335 6.700 -999.990 -999.990 1.083 ..P WKT 2010 10 19 13 39 55 31.3200 -97.3300 251.000 457.0 108.752 5.430 -999.990 -999.990 1.088 ..P WKT 2010 10 19 13 44 55 31.3200 -97.3300 251.000 30.0 128.171 5.570 -999.990 -999.990 1.282 ..P WKT 2010 10 19 13 49 55 31.3200 -97.3300 251.000 122.0 107.686 6.890 -999.990 -999.990 1.077 ..P WKT 2010 10 19 13 54 55 31.3200 -97.3300 251.000 457.0 108.104 6.460 -999.990 -999.990 1.081 ..P WKT 2010 10 19 14 04 55 31.3200 -97.3300 251.000 30.0 113.240 6.860 -999.990 -999.990 1.132 ..P WKT 2010 10 19 14 09 55 31.3200 -97.3300 251.000 122.0 107.378 6.430 -999.990 -999.990 1.074 ..P WKT 2010 10 19 14 14 55 31.3200 -97.3300 251.000 457.0 114.539 6.190 -999.990 -999.990 1.145 ..P WKT 2010 10 19 14 19 55 31.3200 -97.3300 251.000 30.0 117.630 6.140 -999.990 -999.990 1.176 ..P WKT 2010 10 19 14 24 55 31.3200 -97.3300 251.000 122.0 107.969 5.690 -999.990 -999.990 1.080 ..P WKT 2010 10 19 14 29 55 31.3200 -97.3300 251.000 457.0 115.943 5.530 -999.990 -999.990 1.159 ..P WKT 2010 10 19 14 39 55 31.3200 -97.3300 251.000 30.0 117.938 6.000 -999.990 -999.990 1.179 ..P WKT 2010 10 19 14 44 55 31.3200 -97.3300 251.000 122.0 112.233 5.420 -999.990 -999.990 1.122 ..P WKT 2010 10 19 14 49 55 31.3200 -97.3300 251.000 457.0 109.782 5.580 -999.990 -999.990 1.098 ..P WKT 2010 10 19 14 54 55 31.3200 -97.3300 251.000 30.0 118.179 5.520 -999.990 -999.990 1.182 ..P WKT 2010 10 19 14 59 55 31.3200 -97.3300 251.000 122.0 118.169 5.230 -999.990 -999.990 1.182 ..P WKT 2010 10 19 15 04 55 31.3200 -97.3300 251.000 457.0 92.129 5.360 -999.990 -999.990 0.921 ..P WKT 2010 10 19 15 14 55 31.3200 -97.3300 251.000 30.0 111.865 5.560 -999.990 -999.990 1.119 ..P WKT 2010 10 19 15 19 55 31.3200 -97.3300 251.000 122.0 121.575 5.070 -999.990 -999.990 1.216 ..P WKT 2010 10 19 15 24 55 31.3200 -97.3300 251.000 457.0 100.653 5.930 -999.990 -999.990 1.007 ..P WKT 2010 10 19 15 29 55 31.3200 -97.3300 251.000 30.0 119.580 5.920 -999.990 -999.990 1.196 ..P WKT 2010 10 19 15 34 55 31.3200 -97.3300 251.000 122.0 127.256 5.550 -999.990 -999.990 1.273 ..P WKT 2010 10 19 15 39 55 31.3200 -97.3300 251.000 457.0 109.590 5.360 -999.990 -999.990 1.096 ..P WKT 2010 10 19 15 49 55 31.3200 -97.3300 251.000 30.0 125.249 5.260 -999.990 -999.990 1.252 ..P WKT 2010 10 19 15 54 55 31.3200 -97.3300 251.000 122.0 129.032 5.860 -999.990 -999.990 1.290 ..P WKT 2010 10 19 15 59 55 31.3200 -97.3300 251.000 457.0 110.190 5.540 -999.990 -999.990 1.102 ..P WKT 2010 10 19 16 04 55 31.3200 -97.3300 251.000 30.0 114.109 5.740 -999.990 -999.990 1.141 ..P WKT 2010 10 19 16 09 55 31.3200 -97.3300 251.000 122.0 114.099 5.690 -999.990 -999.990 1.141 ..P WKT 2010 10 19 16 14 55 31.3200 -97.3300 251.000 457.0 108.671 5.530 -999.990 -999.990 1.087 ..P WKT 2010 10 19 16 24 55 31.3200 -97.3300 251.000 30.0 116.739 5.310 -999.990 -999.990 1.167 ..P WKT 2010 10 19 16 29 55 31.3200 -97.3300 251.000 122.0 118.993 5.470 -999.990 -999.990 1.190 ..P WKT 2010 10 19 16 34 55 31.3200 -97.3300 251.000 457.0 114.340 5.500 -999.990 -999.990 1.143 ..P WKT 2010 10 19 16 39 55 31.3200 -97.3300 251.000 30.0 109.687 5.920 -999.990 -999.990 1.097 ..P WKT 2010 10 19 16 44 55 31.3200 -97.3300 251.000 122.0 116.003 5.650 -999.990 -999.990 1.160 ..P WKT 2010 10 19 16 49 55 31.3200 -97.3300 251.000 457.0 105.936 5.350 -999.990 -999.990 1.059 ..P WKT 2010 10 19 17 04 55 31.3200 -97.3300 251.000 30.0 112.130 5.440 -999.990 -999.990 1.121 ..P WKT 2010 10 19 17 09 55 31.3200 -97.3300 251.000 122.0 121.205 6.100 -999.990 -999.990 1.212 ..P WKT 2010 10 19 17 14 55 31.3200 -97.3300 251.000 457.0 114.580 5.740 -999.990 -999.990 1.146 ..P WKT 2010 10 19 17 19 55 31.3200 -97.3300 251.000 30.0 113.911 5.560 -999.990 -999.990 1.139 ..P WKT 2010 10 19 17 24 55 31.3200 -97.3300 251.000 122.0 115.677 7.020 -999.990 -999.990 1.157 ..P WKT 2010 10 19 17 29 55 31.3200 -97.3300 251.000 457.0 116.361 5.040 -999.990 -999.990 1.164 ..P WKT 2010 10 19 17 39 55 31.3200 -97.3300 251.000 30.0 121.402 5.570 -999.990 -999.990 1.214 ..P WKT 2010 10 19 17 44 55 31.3200 -97.3300 251.000 122.0 114.666 5.000 -999.990 -999.990 1.147 ..P WKT 2010 10 19 17 49 55 31.3200 -97.3300 251.000 457.0 118.212 5.640 -999.990 -999.990 1.182 ..P WKT 2010 10 19 17 54 55 31.3200 -97.3300 251.000 30.0 123.651 5.410 -999.990 -999.990 1.237 ..P WKT 2010 10 19 17 59 55 31.3200 -97.3300 251.000 122.0 124.491 5.460 -999.990 -999.990 1.245 ..P WKT 2010 10 19 18 04 55 31.3200 -97.3300 251.000 457.0 112.888 5.220 -999.990 -999.990 1.129 ..P WKT 2010 10 19 18 14 55 31.3200 -97.3300 251.000 30.0 116.152 5.550 -999.990 -999.990 1.162 ..P WKT 2010 10 19 18 19 55 31.3200 -97.3300 251.000 122.0 122.362 5.160 -999.990 -999.990 1.224 ..P WKT 2010 10 19 18 24 55 31.3200 -97.3300 251.000 457.0 125.868 5.490 -999.990 -999.990 1.259 ..P WKT 2010 10 19 18 29 55 31.3200 -97.3300 251.000 30.0 118.015 4.990 -999.990 -999.990 1.180 ..P WKT 2010 10 19 18 34 55 31.3200 -97.3300 251.000 122.0 112.868 5.150 -999.990 -999.990 1.129 ..P WKT 2010 10 19 18 39 55 31.3200 -97.3300 251.000 457.0 117.725 4.940 -999.990 -999.990 1.177 ..P WKT 2010 10 19 18 49 55 31.3200 -97.3300 251.000 30.0 111.429 4.900 -999.990 -999.990 1.114 ..P WKT 2010 10 19 18 54 55 31.3200 -97.3300 251.000 122.0 122.985 5.050 -999.990 -999.990 1.230 ..P WKT 2010 10 19 18 59 55 31.3200 -97.3300 251.000 457.0 118.863 5.090 -999.990 -999.990 1.189 ..P WKT 2010 10 19 19 04 55 31.3200 -97.3300 251.000 30.0 117.443 5.240 -999.990 -999.990 1.174 ..P WKT 2010 10 19 19 09 55 31.3200 -97.3300 251.000 122.0 118.997 5.570 -999.990 -999.990 1.190 ..P WKT 2010 10 19 19 14 55 31.3200 -97.3300 251.000 457.0 117.037 6.330 -999.990 -999.990 1.170 ..P WKT 2010 10 19 19 24 55 31.3200 -97.3300 251.000 30.0 116.226 5.820 -999.990 -999.990 1.162 ..P WKT 2010 10 19 19 29 55 31.3200 -97.3300 251.000 122.0 119.129 5.550 -999.990 -999.990 1.191 ..P WKT 2010 10 19 19 34 55 31.3200 -97.3300 251.000 457.0 116.090 5.840 -999.990 -999.990 1.161 ..P WKT 2010 10 19 19 39 55 31.3200 -97.3300 251.000 30.0 116.833 5.800 -999.990 -999.990 1.168 ..P WKT 2010 10 19 19 44 55 31.3200 -97.3300 251.000 122.0 117.440 5.550 -999.990 -999.990 1.174 ..P WKT 2010 10 19 19 49 55 31.3200 -97.3300 251.000 457.0 115.211 6.060 -999.990 -999.990 1.152 ..P WKT 2010 10 19 19 59 55 31.3200 -97.3300 251.000 30.0 115.307 5.350 -999.990 -999.990 1.153 ..P WKT 2010 10 19 20 04 55 31.3200 -97.3300 251.000 122.0 114.931 5.970 -999.990 -999.990 1.149 ..P WKT 2010 10 19 20 09 55 31.3200 -97.3300 251.000 457.0 114.285 6.050 -999.990 -999.990 1.143 ..P WKT 2010 10 19 20 14 55 31.3200 -97.3300 251.000 30.0 111.478 5.500 -999.990 -999.990 1.115 ..P WKT 2010 10 19 20 19 55 31.3200 -97.3300 251.000 122.0 119.067 5.520 -999.990 -999.990 1.191 ..P WKT 2010 10 19 20 24 55 31.3200 -97.3300 251.000 457.0 119.230 5.800 -999.990 -999.990 1.192 ..P WKT 2010 10 19 20 34 55 31.3200 -97.3300 251.000 30.0 118.342 5.430 -999.990 -999.990 1.183 ..P WKT 2010 10 19 20 39 55 31.3200 -97.3300 251.000 122.0 117.831 5.650 -999.990 -999.990 1.178 ..P WKT 2010 10 19 20 44 55 31.3200 -97.3300 251.000 457.0 121.773 5.340 -999.990 -999.990 1.218 ..P WKT 2010 10 19 20 49 55 31.3200 -97.3300 251.000 30.0 117.213 5.280 -999.990 -999.990 1.172 ..P WKT 2010 10 19 20 54 55 31.3200 -97.3300 251.000 122.0 118.860 6.240 -999.990 -999.990 1.189 ..P WKT 2010 10 19 20 59 55 31.3200 -97.3300 251.000 457.0 118.350 5.400 -999.990 -999.990 1.183 ..P WKT 2010 10 19 21 09 55 31.3200 -97.3300 251.000 30.0 111.564 5.730 -999.990 -999.990 1.116 ..P WKT 2010 10 19 21 14 55 31.3200 -97.3300 251.000 122.0 115.139 5.230 -999.990 -999.990 1.151 ..P WKT 2010 10 19 21 19 55 31.3200 -97.3300 251.000 457.0 116.556 5.200 -999.990 -999.990 1.166 ..P WKT 2010 10 19 21 24 55 31.3200 -97.3300 251.000 30.0 116.892 5.240 -999.990 -999.990 1.169 ..P WKT 2010 10 19 21 29 55 31.3200 -97.3300 251.000 122.0 122.354 5.550 -999.990 -999.990 1.224 ..P WKT 2010 10 19 21 34 55 31.3200 -97.3300 251.000 457.0 117.296 5.690 -999.990 -999.990 1.173 ..P WKT 2010 10 19 21 44 55 31.3200 -97.3300 251.000 30.0 116.159 5.690 -999.990 -999.990 1.162 ..P WKT 2010 10 19 21 49 55 31.3200 -97.3300 251.000 122.0 117.112 5.130 -999.990 -999.990 1.171 ..P WKT 2010 10 19 21 54 55 31.3200 -97.3300 251.000 457.0 115.099 5.040 -999.990 -999.990 1.151 ..P WKT 2010 10 19 21 59 55 31.3200 -97.3300 251.000 30.0 116.861 5.810 -999.990 -999.990 1.169 ..P WKT 2010 10 19 22 04 55 31.3200 -97.3300 251.000 122.0 124.824 5.820 -999.990 -999.990 1.248 ..P WKT 2010 10 19 22 09 55 31.3200 -97.3300 251.000 457.0 119.305 4.950 -999.990 -999.990 1.193 ..P WKT 2010 10 19 22 19 55 31.3200 -97.3300 251.000 30.0 120.633 5.000 -999.990 -999.990 1.206 ..P WKT 2010 10 19 22 24 55 31.3200 -97.3300 251.000 122.0 136.372 5.120 -999.990 -999.990 1.364 ..P WKT 2010 10 19 22 29 55 31.3200 -97.3300 251.000 457.0 133.512 5.260 -999.990 -999.990 1.335 ..P WKT 2010 10 19 22 34 55 31.3200 -97.3300 251.000 30.0 139.006 5.200 -999.990 -999.990 1.390 ..P WKT 2010 10 19 22 39 55 31.3200 -97.3300 251.000 122.0 140.996 5.300 -999.990 -999.990 1.410 ..P WKT 2010 10 19 22 44 55 31.3200 -97.3300 251.000 457.0 134.903 5.790 -999.990 -999.990 1.349 ..P WKT 2010 10 19 22 54 55 31.3200 -97.3300 251.000 30.0 129.915 5.080 -999.990 -999.990 1.299 ..P WKT 2010 10 19 22 59 55 31.3200 -97.3300 251.000 122.0 130.212 5.210 -999.990 -999.990 1.302 ..P WKT 2010 10 19 23 04 55 31.3200 -97.3300 251.000 457.0 134.819 5.990 -999.990 -999.990 1.348 ..P WKT 2010 10 19 23 09 55 31.3200 -97.3300 251.000 30.0 129.190 5.270 -999.990 -999.990 1.292 ..P WKT 2010 10 19 23 14 55 31.3200 -97.3300 251.000 122.0 131.641 5.670 -999.990 -999.990 1.316 ..P WKT 2010 10 19 23 19 55 31.3200 -97.3300 251.000 457.0 122.107 5.870 -999.990 -999.990 1.221 ..P WKT 2010 10 19 23 29 55 31.3200 -97.3300 251.000 30.0 133.941 5.810 -999.990 -999.990 1.339 ..P WKT 2010 10 19 23 34 55 31.3200 -97.3300 251.000 122.0 133.627 6.580 -999.990 -999.990 1.336 ..P WKT 2010 10 19 23 39 55 31.3200 -97.3300 251.000 457.0 129.947 5.610 -999.990 -999.990 1.299 ..P WKT 2010 10 19 23 44 55 31.3200 -97.3300 251.000 30.0 133.133 7.000 -999.990 -999.990 1.331 ..P WKT 2010 10 19 23 49 55 31.3200 -97.3300 251.000 122.0 129.050 6.070 -999.990 -999.990 1.291 ..P WKT 2010 10 20 00 09 55 31.3200 -97.3300 251.000 457.0 126.445 6.220 -999.990 -999.990 1.264 ..P WKT 2010 10 20 00 10 25 31.3200 -97.3300 251.000 457.0 124.917 5.550 -999.990 -999.990 1.249 ..P WKT 2010 10 20 00 10 55 31.3200 -97.3300 251.000 457.0 130.254 5.620 -999.990 -999.990 1.303 ..P WKT 2010 10 20 00 11 25 31.3200 -97.3300 251.000 457.0 129.669 5.380 -999.990 -999.990 1.297 ..P WKT 2010 10 20 00 11 55 31.3200 -97.3300 251.000 457.0 131.910 5.320 -999.990 -999.990 1.319 ..P WKT 2010 10 20 00 12 25 31.3200 -97.3300 251.000 457.0 129.575 5.210 -999.990 -999.990 1.296 ..P WKT 2010 10 20 00 12 55 31.3200 -97.3300 251.000 457.0 128.720 5.470 -999.990 -999.990 1.287 ..P WKT 2010 10 20 00 13 25 31.3200 -97.3300 251.000 457.0 131.903 5.690 -999.990 -999.990 1.319 ..P WKT 2010 10 20 00 13 55 31.3200 -97.3300 251.000 457.0 129.433 6.040 -999.990 -999.990 1.294 ..P WKT 2010 10 20 00 14 25 31.3200 -97.3300 251.000 457.0 126.558 5.300 -999.990 -999.990 1.266 ..P WKT 2010 10 20 00 14 55 31.3200 -97.3300 251.000 457.0 127.184 6.250 -999.990 -999.990 1.272 ..P WKT 2010 10 20 00 19 55 31.3200 -97.3300 251.000 30.0 136.270 6.010 -999.990 -999.990 1.363 ..P WKT 2010 10 20 00 24 55 31.3200 -97.3300 251.000 122.0 128.393 5.610 -999.990 -999.990 1.284 ..P WKT 2010 10 20 00 29 55 31.3200 -97.3300 251.000 457.0 131.825 5.590 -999.990 -999.990 1.318 ..P WKT 2010 10 20 00 34 55 31.3200 -97.3300 251.000 30.0 130.140 5.130 -999.990 -999.990 1.301 ..P WKT 2010 10 20 00 39 55 31.3200 -97.3300 251.000 122.0 123.337 5.480 -999.990 -999.990 1.233 ..P WKT 2010 10 20 00 44 55 31.3200 -97.3300 251.000 457.0 125.827 5.290 -999.990 -999.990 1.258 ..P WKT 2010 10 20 00 54 55 31.3200 -97.3300 251.000 30.0 138.908 5.710 -999.990 -999.990 1.389 ..P WKT 2010 10 20 00 59 55 31.3200 -97.3300 251.000 122.0 127.944 5.260 -999.990 -999.990 1.279 ..P WKT 2010 10 20 01 04 55 31.3200 -97.3300 251.000 457.0 122.234 5.320 -999.990 -999.990 1.222 ..P WKT 2010 10 20 01 09 55 31.3200 -97.3300 251.000 30.0 133.904 5.860 -999.990 -999.990 1.339 ..P WKT 2010 10 20 01 14 55 31.3200 -97.3300 251.000 122.0 142.882 5.790 -999.990 -999.990 1.429 ..P WKT 2010 10 20 01 19 55 31.3200 -97.3300 251.000 457.0 127.063 7.220 -999.990 -999.990 1.271 ..P WKT 2010 10 20 01 29 55 31.3200 -97.3300 251.000 30.0 139.861 7.020 -999.990 -999.990 1.399 ..P WKT 2010 10 20 01 34 55 31.3200 -97.3300 251.000 122.0 129.122 5.430 -999.990 -999.990 1.291 ..P WKT 2010 10 20 01 39 55 31.3200 -97.3300 251.000 457.0 128.358 5.930 -999.990 -999.990 1.284 ..P WKT 2010 10 20 01 44 55 31.3200 -97.3300 251.000 30.0 153.210 6.860 -999.990 -999.990 1.532 ..P WKT 2010 10 20 01 49 55 31.3200 -97.3300 251.000 122.0 131.683 6.290 -999.990 -999.990 1.317 ..P WKT 2010 10 20 01 54 55 31.3200 -97.3300 251.000 457.0 129.030 5.620 -999.990 -999.990 1.290 ..P WKT 2010 10 20 02 04 55 31.3200 -97.3300 251.000 30.0 137.867 6.120 -999.990 -999.990 1.379 ..P WKT 2010 10 20 02 09 55 31.3200 -97.3300 251.000 122.0 125.888 6.640 -999.990 -999.990 1.259 ..P WKT 2010 10 20 02 14 55 31.3200 -97.3300 251.000 457.0 118.225 6.210 -999.990 -999.990 1.182 ..P WKT 2010 10 20 02 19 55 31.3200 -97.3300 251.000 30.0 132.144 5.750 -999.990 -999.990 1.321 ..P WKT 2010 10 20 02 24 55 31.3200 -97.3300 251.000 122.0 127.987 6.250 -999.990 -999.990 1.280 ..P WKT 2010 10 20 02 29 55 31.3200 -97.3300 251.000 457.0 114.386 6.250 -999.990 -999.990 1.144 ..P WKT 2010 10 20 02 39 55 31.3200 -97.3300 251.000 30.0 146.569 5.990 -999.990 -999.990 1.466 ..P WKT 2010 10 20 02 44 55 31.3200 -97.3300 251.000 122.0 132.176 5.650 -999.990 -999.990 1.322 ..P WKT 2010 10 20 02 49 55 31.3200 -97.3300 251.000 457.0 125.067 5.660 -999.990 -999.990 1.251 ..P WKT 2010 10 20 02 54 55 31.3200 -97.3300 251.000 30.0 143.333 5.820 -999.990 -999.990 1.433 ..P WKT 2010 10 20 02 59 55 31.3200 -97.3300 251.000 122.0 136.494 5.390 -999.990 -999.990 1.365 ..P WKT 2010 10 20 03 04 55 31.3200 -97.3300 251.000 457.0 138.699 6.310 -999.990 -999.990 1.387 ..P WKT 2010 10 20 03 14 55 31.3200 -97.3300 251.000 30.0 156.246 6.090 -999.990 -999.990 1.562 ..P WKT 2010 10 20 03 19 55 31.3200 -97.3300 251.000 122.0 144.179 5.460 -999.990 -999.990 1.442 ..P WKT 2010 10 20 03 24 55 31.3200 -97.3300 251.000 457.0 142.102 5.730 -999.990 -999.990 1.421 ..P WKT 2010 10 20 03 29 55 31.3200 -97.3300 251.000 30.0 151.235 5.900 -999.990 -999.990 1.512 ..P WKT 2010 10 20 03 34 55 31.3200 -97.3300 251.000 122.0 133.627 5.530 -999.990 -999.990 1.336 ..P WKT 2010 10 20 03 39 55 31.3200 -97.3300 251.000 457.0 145.867 6.130 -999.990 -999.990 1.459 ..P WKT 2010 10 20 03 49 55 31.3200 -97.3300 251.000 30.0 145.515 7.190 -999.990 -999.990 1.455 ..P WKT 2010 10 20 03 54 55 31.3200 -97.3300 251.000 122.0 148.726 6.320 -999.990 -999.990 1.487 ..P WKT 2010 10 20 03 59 55 31.3200 -97.3300 251.000 457.0 157.477 5.960 -999.990 -999.990 1.575 ..P WKT 2010 10 20 04 04 55 31.3200 -97.3300 251.000 30.0 146.637 5.730 -999.990 -999.990 1.466 ..P WKT 2010 10 20 04 09 55 31.3200 -97.3300 251.000 122.0 130.254 5.480 -999.990 -999.990 1.303 ..P WKT 2010 10 20 04 14 55 31.3200 -97.3300 251.000 457.0 147.791 5.780 -999.990 -999.990 1.478 ..P WKT 2010 10 20 04 24 55 31.3200 -97.3300 251.000 30.0 161.980 5.670 -999.990 -999.990 1.620 ..P WKT 2010 10 20 04 29 55 31.3200 -97.3300 251.000 122.0 154.032 6.220 -999.990 -999.990 1.540 ..P WKT 2010 10 20 04 34 55 31.3200 -97.3300 251.000 457.0 141.893 5.930 -999.990 -999.990 1.419 ..P WKT 2010 10 20 04 39 55 31.3200 -97.3300 251.000 30.0 150.842 6.130 -999.990 -999.990 1.508 ..P WKT 2010 10 20 04 44 55 31.3200 -97.3300 251.000 122.0 125.585 5.510 -999.990 -999.990 1.256 ..P WKT 2010 10 20 04 49 55 31.3200 -97.3300 251.000 457.0 135.346 5.660 -999.990 -999.990 1.353 ..P WKT 2010 10 20 05 04 55 31.3200 -97.3300 251.000 30.0 146.645 6.430 -999.990 -999.990 1.466 ..P WKT 2010 10 20 05 09 55 31.3200 -97.3300 251.000 122.0 111.973 5.840 -999.990 -999.990 1.120 ..P WKT 2010 10 20 05 14 55 31.3200 -97.3300 251.000 457.0 115.985 6.660 -999.990 -999.990 1.160 ..P WKT 2010 10 20 05 19 55 31.3200 -97.3300 251.000 30.0 141.103 6.200 -999.990 -999.990 1.411 ..P WKT 2010 10 20 05 24 55 31.3200 -97.3300 251.000 122.0 123.200 6.550 -999.990 -999.990 1.232 ..P WKT 2010 10 20 05 29 55 31.3200 -97.3300 251.000 457.0 118.284 5.880 -999.990 -999.990 1.183 ..P WKT 2010 10 20 05 39 55 31.3200 -97.3300 251.000 30.0 142.332 6.360 -999.990 -999.990 1.423 ..P WKT 2010 10 20 05 44 55 31.3200 -97.3300 251.000 122.0 127.181 6.320 -999.990 -999.990 1.272 ..P WKT 2010 10 20 05 49 55 31.3200 -97.3300 251.000 457.0 110.944 6.010 -999.990 -999.990 1.109 ..P WKT 2010 10 20 05 54 55 31.3200 -97.3300 251.000 30.0 146.143 6.100 -999.990 -999.990 1.461 ..P WKT 2010 10 20 05 59 55 31.3200 -97.3300 251.000 122.0 133.696 6.250 -999.990 -999.990 1.337 ..P WKT 2010 10 20 06 04 55 31.3200 -97.3300 251.000 457.0 106.896 6.100 -999.990 -999.990 1.069 ..P WKT 2010 10 20 06 14 55 31.3200 -97.3300 251.000 30.0 148.649 6.470 -999.990 -999.990 1.486 ..P WKT 2010 10 20 06 19 55 31.3200 -97.3300 251.000 122.0 171.445 6.310 -999.990 -999.990 1.714 ..P WKT 2010 10 20 06 24 55 31.3200 -97.3300 251.000 457.0 98.092 6.780 -999.990 -999.990 0.981 ..P WKT 2010 10 20 06 29 55 31.3200 -97.3300 251.000 30.0 154.205 5.730 -999.990 -999.990 1.542 ..P WKT 2010 10 20 06 34 55 31.3200 -97.3300 251.000 122.0 163.462 6.500 -999.990 -999.990 1.635 ..P WKT 2010 10 20 06 39 55 31.3200 -97.3300 251.000 457.0 103.366 5.470 -999.990 -999.990 1.034 ..P WKT 2010 10 20 06 49 55 31.3200 -97.3300 251.000 30.0 169.451 5.480 -999.990 -999.990 1.695 ..P WKT 2010 10 20 06 54 55 31.3200 -97.3300 251.000 122.0 187.539 7.190 -999.990 -999.990 1.875 ..P WKT 2010 10 20 06 59 55 31.3200 -97.3300 251.000 457.0 104.950 5.640 -999.990 -999.990 1.050 ..P WKT 2010 10 20 07 04 55 31.3200 -97.3300 251.000 30.0 166.942 5.520 -999.990 -999.990 1.669 ..P WKT 2010 10 20 07 09 55 31.3200 -97.3300 251.000 122.0 176.632 5.970 -999.990 -999.990 1.766 ..P WKT 2010 10 20 07 14 55 31.3200 -97.3300 251.000 457.0 107.848 6.010 -999.990 -999.990 1.078 ..P WKT 2010 10 20 07 24 55 31.3200 -97.3300 251.000 30.0 173.776 5.830 -999.990 -999.990 1.738 ..P WKT 2010 10 20 07 29 55 31.3200 -97.3300 251.000 122.0 142.314 5.730 -999.990 -999.990 1.423 ..P WKT 2010 10 20 07 34 55 31.3200 -97.3300 251.000 457.0 108.407 5.570 -999.990 -999.990 1.084 ..P WKT 2010 10 20 07 39 55 31.3200 -97.3300 251.000 30.0 174.289 6.440 -999.990 -999.990 1.743 ..P WKT 2010 10 20 07 44 55 31.3200 -97.3300 251.000 122.0 133.192 5.850 -999.990 -999.990 1.332 ..P WKT 2010 10 20 07 49 55 31.3200 -97.3300 251.000 457.0 107.820 6.120 -999.990 -999.990 1.078 ..P WKT 2010 10 20 07 59 55 31.3200 -97.3300 251.000 30.0 174.056 6.580 -999.990 -999.990 1.741 ..P WKT 2010 10 20 08 04 55 31.3200 -97.3300 251.000 122.0 122.579 6.050 -999.990 -999.990 1.226 ..P WKT 2010 10 20 08 09 55 31.3200 -97.3300 251.000 457.0 104.736 5.770 -999.990 -999.990 1.047 ..P WKT 2010 10 20 08 14 55 31.3200 -97.3300 251.000 30.0 159.607 5.920 -999.990 -999.990 1.596 ..P WKT 2010 10 20 08 19 55 31.3200 -97.3300 251.000 122.0 117.208 5.680 -999.990 -999.990 1.172 ..P WKT 2010 10 20 08 24 55 31.3200 -97.3300 251.000 457.0 104.245 6.130 -999.990 -999.990 1.042 ..P WKT 2010 10 20 08 34 55 31.3200 -97.3300 251.000 30.0 152.371 5.750 -999.990 -999.990 1.524 ..P WKT 2010 10 20 08 39 55 31.3200 -97.3300 251.000 122.0 113.583 5.600 -999.990 -999.990 1.136 ..P WKT 2010 10 20 08 44 55 31.3200 -97.3300 251.000 457.0 102.205 5.660 -999.990 -999.990 1.022 ..P WKT 2010 10 20 08 49 55 31.3200 -97.3300 251.000 30.0 149.739 5.760 -999.990 -999.990 1.497 ..P WKT 2010 10 20 08 54 55 31.3200 -97.3300 251.000 122.0 119.085 6.680 -999.990 -999.990 1.191 ..P WKT 2010 10 20 08 59 55 31.3200 -97.3300 251.000 457.0 103.226 5.980 -999.990 -999.990 1.032 ..P WKT 2010 10 20 09 09 55 31.3200 -97.3300 251.000 30.0 130.333 6.170 -999.990 -999.990 1.303 ..P WKT 2010 10 20 09 14 55 31.3200 -97.3300 251.000 122.0 114.237 5.900 -999.990 -999.990 1.142 ..P WKT 2010 10 20 09 19 55 31.3200 -97.3300 251.000 457.0 103.028 5.820 -999.990 -999.990 1.030 ..P WKT 2010 10 20 09 24 55 31.3200 -97.3300 251.000 30.0 131.748 5.940 -999.990 -999.990 1.317 ..P WKT 2010 10 20 09 29 55 31.3200 -97.3300 251.000 122.0 120.810 5.760 -999.990 -999.990 1.208 ..P WKT 2010 10 20 09 34 55 31.3200 -97.3300 251.000 457.0 101.992 5.670 -999.990 -999.990 1.020 ..P WKT 2010 10 20 09 44 55 31.3200 -97.3300 251.000 30.0 130.803 5.610 -999.990 -999.990 1.308 ..P WKT 2010 10 20 09 49 55 31.3200 -97.3300 251.000 122.0 114.582 6.100 -999.990 -999.990 1.146 ..P WKT 2010 10 20 09 54 55 31.3200 -97.3300 251.000 457.0 106.783 5.980 -999.990 -999.990 1.068 ..P WKT 2010 10 20 09 59 55 31.3200 -97.3300 251.000 30.0 125.618 5.810 -999.990 -999.990 1.256 ..P WKT 2010 10 20 10 04 55 31.3200 -97.3300 251.000 122.0 118.363 5.940 -999.990 -999.990 1.184 ..P WKT 2010 10 20 10 09 55 31.3200 -97.3300 251.000 457.0 104.311 6.700 -999.990 -999.990 1.043 ..P WKT 2010 10 20 10 19 55 31.3200 -97.3300 251.000 30.0 129.565 6.480 -999.990 -999.990 1.296 ..P WKT 2010 10 20 10 24 55 31.3200 -97.3300 251.000 122.0 119.938 5.850 -999.990 -999.990 1.199 ..P WKT 2010 10 20 10 29 55 31.3200 -97.3300 251.000 457.0 116.019 6.410 -999.990 -999.990 1.160 ..P WKT 2010 10 20 10 34 55 31.3200 -97.3300 251.000 30.0 133.313 6.020 -999.990 -999.990 1.333 ..P WKT 2010 10 20 10 39 55 31.3200 -97.3300 251.000 122.0 122.596 5.680 -999.990 -999.990 1.226 ..P WKT 2010 10 20 10 44 55 31.3200 -97.3300 251.000 457.0 116.501 6.500 -999.990 -999.990 1.165 ..P WKT 2010 10 20 10 54 55 31.3200 -97.3300 251.000 30.0 132.755 5.690 -999.990 -999.990 1.328 ..P WKT 2010 10 20 10 59 55 31.3200 -97.3300 251.000 122.0 122.190 5.620 -999.990 -999.990 1.222 ..P WKT 2010 10 20 11 04 55 31.3200 -97.3300 251.000 457.0 101.829 5.850 -999.990 -999.990 1.018 ..P WKT 2010 10 20 11 09 55 31.3200 -97.3300 251.000 30.0 131.667 5.850 -999.990 -999.990 1.317 ..P WKT 2010 10 20 11 14 55 31.3200 -97.3300 251.000 122.0 125.452 6.280 -999.990 -999.990 1.255 ..P WKT 2010 10 20 11 19 55 31.3200 -97.3300 251.000 457.0 99.508 5.880 -999.990 -999.990 0.995 ..P WKT 2010 10 20 11 29 55 31.3200 -97.3300 251.000 30.0 130.957 6.230 -999.990 -999.990 1.310 ..P WKT 2010 10 20 11 34 55 31.3200 -97.3300 251.000 122.0 128.752 5.750 -999.990 -999.990 1.288 ..P WKT 2010 10 20 11 39 55 31.3200 -97.3300 251.000 457.0 104.360 5.810 -999.990 -999.990 1.044 ..P WKT 2010 10 20 11 44 55 31.3200 -97.3300 251.000 30.0 127.335 6.800 -999.990 -999.990 1.273 ..P WKT 2010 10 20 11 49 55 31.3200 -97.3300 251.000 122.0 131.119 6.330 -999.990 -999.990 1.311 ..P WKT 2010 10 20 12 09 55 31.3200 -97.3300 251.000 457.0 104.151 5.950 -999.990 -999.990 1.042 ..P WKT 2010 10 20 12 10 25 31.3200 -97.3300 251.000 457.0 107.505 5.920 -999.990 -999.990 1.075 ..P WKT 2010 10 20 12 10 55 31.3200 -97.3300 251.000 457.0 108.134 5.850 -999.990 -999.990 1.081 ..P WKT 2010 10 20 12 11 25 31.3200 -97.3300 251.000 457.0 102.910 6.080 -999.990 -999.990 1.029 ..P WKT 2010 10 20 12 11 55 31.3200 -97.3300 251.000 457.0 105.855 6.020 -999.990 -999.990 1.059 ..P WKT 2010 10 20 12 12 25 31.3200 -97.3300 251.000 457.0 102.400 5.870 -999.990 -999.990 1.024 ..P WKT 2010 10 20 12 12 55 31.3200 -97.3300 251.000 457.0 106.162 6.230 -999.990 -999.990 1.062 ..P WKT 2010 10 20 12 13 25 31.3200 -97.3300 251.000 457.0 105.839 6.170 -999.990 -999.990 1.058 ..P WKT 2010 10 20 12 13 55 31.3200 -97.3300 251.000 457.0 108.647 6.050 -999.990 -999.990 1.086 ..P WKT 2010 10 20 12 14 25 31.3200 -97.3300 251.000 457.0 104.785 5.830 -999.990 -999.990 1.048 ..P WKT 2010 10 20 12 14 55 31.3200 -97.3300 251.000 457.0 102.555 6.130 -999.990 -999.990 1.026 ..P WKT 2010 10 20 12 19 55 31.3200 -97.3300 251.000 30.0 119.476 6.120 -999.990 -999.990 1.195 ..P WKT 2010 10 20 12 24 55 31.3200 -97.3300 251.000 122.0 121.965 5.930 -999.990 -999.990 1.220 ..P WKT 2010 10 20 12 29 55 31.3200 -97.3300 251.000 457.0 102.260 6.170 -999.990 -999.990 1.023 ..P WKT 2010 10 20 12 34 55 31.3200 -97.3300 251.000 30.0 126.806 5.900 -999.990 -999.990 1.268 ..P WKT 2010 10 20 12 39 55 31.3200 -97.3300 251.000 122.0 123.303 6.240 -999.990 -999.990 1.233 ..P WKT 2010 10 20 12 44 55 31.3200 -97.3300 251.000 457.0 99.377 5.740 -999.990 -999.990 0.994 ..P WKT 2010 10 20 12 54 55 31.3200 -97.3300 251.000 30.0 135.305 5.640 -999.990 -999.990 1.353 ..P WKT 2010 10 20 12 59 55 31.3200 -97.3300 251.000 122.0 151.043 6.210 -999.990 -999.990 1.510 ..P WKT 2010 10 20 13 04 55 31.3200 -97.3300 251.000 457.0 112.729 6.820 -999.990 -999.990 1.127 ..P WKT 2010 10 20 13 09 55 31.3200 -97.3300 251.000 30.0 151.478 5.600 -999.990 -999.990 1.515 ..P WKT 2010 10 20 13 14 55 31.3200 -97.3300 251.000 122.0 140.666 6.730 -999.990 -999.990 1.407 ..P WKT 2010 10 20 13 19 55 31.3200 -97.3300 251.000 457.0 108.342 6.420 -999.990 -999.990 1.083 ..P WKT 2010 10 20 13 29 55 31.3200 -97.3300 251.000 30.0 154.349 5.730 -999.990 -999.990 1.543 ..P WKT 2010 10 20 13 34 55 31.3200 -97.3300 251.000 122.0 171.684 5.910 -999.990 -999.990 1.717 ..P WKT 2010 10 20 13 39 55 31.3200 -97.3300 251.000 457.0 109.229 5.500 -999.990 -999.990 1.092 ..P WKT 2010 10 20 13 44 55 31.3200 -97.3300 251.000 30.0 161.692 5.690 -999.990 -999.990 1.617 ..P WKT 2010 10 20 13 49 55 31.3200 -97.3300 251.000 122.0 171.129 5.730 -999.990 -999.990 1.711 ..P WKT 2010 10 20 13 54 55 31.3200 -97.3300 251.000 457.0 108.947 5.560 -999.990 -999.990 1.089 ..P WKT 2010 10 20 14 04 55 31.3200 -97.3300 251.000 30.0 162.366 6.540 -999.990 -999.990 1.624 ..P WKT 2010 10 20 14 09 55 31.3200 -97.3300 251.000 122.0 162.233 5.430 -999.990 -999.990 1.622 ..P WKT 2010 10 20 14 14 55 31.3200 -97.3300 251.000 457.0 105.459 5.290 -999.990 -999.990 1.055 ..P WKT 2010 10 20 14 19 55 31.3200 -97.3300 251.000 30.0 159.517 5.780 -999.990 -999.990 1.595 ..P WKT 2010 10 20 14 24 55 31.3200 -97.3300 251.000 122.0 164.013 6.300 -999.990 -999.990 1.640 ..P WKT 2010 10 20 14 29 55 31.3200 -97.3300 251.000 457.0 101.247 5.060 -999.990 -999.990 1.012 ..P WKT 2010 10 20 14 39 55 31.3200 -97.3300 251.000 30.0 160.852 5.240 -999.990 -999.990 1.609 ..P WKT 2010 10 20 14 44 55 31.3200 -97.3300 251.000 122.0 169.939 5.330 -999.990 -999.990 1.699 ..P WKT 2010 10 20 14 49 55 31.3200 -97.3300 251.000 457.0 107.134 5.020 -999.990 -999.990 1.071 ..P WKT 2010 10 20 14 54 55 31.3200 -97.3300 251.000 30.0 161.425 5.060 -999.990 -999.990 1.614 ..P WKT 2010 10 20 14 59 55 31.3200 -97.3300 251.000 122.0 173.780 5.300 -999.990 -999.990 1.738 ..P WKT 2010 10 20 15 04 55 31.3200 -97.3300 251.000 457.0 104.440 5.050 -999.990 -999.990 1.044 ..P WKT 2010 10 20 15 14 55 31.3200 -97.3300 251.000 30.0 168.830 5.250 -999.990 -999.990 1.688 ..P WKT 2010 10 20 15 19 55 31.3200 -97.3300 251.000 122.0 167.082 5.660 -999.990 -999.990 1.671 ..P WKT 2010 10 20 15 24 55 31.3200 -97.3300 251.000 457.0 116.726 5.730 -999.990 -999.990 1.167 ..P WKT 2010 10 20 15 29 55 31.3200 -97.3300 251.000 30.0 164.132 6.110 -999.990 -999.990 1.641 ..P WKT 2010 10 20 15 34 55 31.3200 -97.3300 251.000 122.0 170.145 7.180 -999.990 -999.990 1.701 ..P WKT 2010 10 20 15 39 55 31.3200 -97.3300 251.000 457.0 113.934 7.880 -999.990 -999.990 1.139 ..P WKT 2010 10 20 15 49 55 31.3200 -97.3300 251.000 30.0 174.959 7.520 -999.990 -999.990 1.750 ..P WKT 2010 10 20 15 54 55 31.3200 -97.3300 251.000 122.0 178.638 6.920 -999.990 -999.990 1.786 ..P WKT 2010 10 20 15 59 55 31.3200 -97.3300 251.000 457.0 115.873 6.470 -999.990 -999.990 1.159 ..P WKT 2010 10 20 16 04 55 31.3200 -97.3300 251.000 30.0 170.884 6.150 -999.990 -999.990 1.709 ..P WKT 2010 10 20 16 09 55 31.3200 -97.3300 251.000 122.0 177.696 5.820 -999.990 -999.990 1.777 ..P WKT 2010 10 20 16 14 55 31.3200 -97.3300 251.000 457.0 120.239 5.850 -999.990 -999.990 1.202 ..P WKT 2010 10 20 16 24 55 31.3200 -97.3300 251.000 30.0 170.022 5.620 -999.990 -999.990 1.700 ..P WKT 2010 10 20 16 29 55 31.3200 -97.3300 251.000 122.0 173.778 5.830 -999.990 -999.990 1.738 ..P WKT 2010 10 20 16 34 55 31.3200 -97.3300 251.000 457.0 119.668 5.490 -999.990 -999.990 1.197 ..P WKT 2010 10 20 16 39 55 31.3200 -97.3300 251.000 30.0 167.541 5.810 -999.990 -999.990 1.675 ..P WKT 2010 10 20 16 44 55 31.3200 -97.3300 251.000 122.0 170.618 6.850 -999.990 -999.990 1.706 ..P WKT 2010 10 20 16 49 55 31.3200 -97.3300 251.000 457.0 125.358 5.950 -999.990 -999.990 1.254 ..P WKT 2010 10 20 17 04 55 31.3200 -97.3300 251.000 30.0 150.537 5.440 -999.990 -999.990 1.505 ..P WKT 2010 10 20 17 09 55 31.3200 -97.3300 251.000 122.0 158.321 5.190 -999.990 -999.990 1.583 ..P WKT 2010 10 20 17 14 55 31.3200 -97.3300 251.000 457.0 151.127 4.970 -999.990 -999.990 1.511 ..P WKT 2010 10 20 17 19 55 31.3200 -97.3300 251.000 30.0 148.018 4.830 -999.990 -999.990 1.480 ..P WKT 2010 10 20 17 24 55 31.3200 -97.3300 251.000 122.0 152.534 4.930 -999.990 -999.990 1.525 ..P WKT 2010 10 20 17 29 55 31.3200 -97.3300 251.000 457.0 150.514 4.800 -999.990 -999.990 1.505 ..P WKT 2010 10 20 17 39 55 31.3200 -97.3300 251.000 30.0 151.046 4.840 -999.990 -999.990 1.510 ..P WKT 2010 10 20 17 44 55 31.3200 -97.3300 251.000 122.0 150.057 4.380 -999.990 -999.990 1.501 ..P WKT 2010 10 20 17 49 55 31.3200 -97.3300 251.000 457.0 145.528 5.960 -999.990 -999.990 1.455 ..P WKT 2010 10 20 17 54 55 31.3200 -97.3300 251.000 30.0 149.441 4.750 -999.990 -999.990 1.494 ..P WKT 2010 10 20 17 59 55 31.3200 -97.3300 251.000 122.0 152.264 4.520 -999.990 -999.990 1.523 ..P WKT 2010 10 20 18 04 55 31.3200 -97.3300 251.000 457.0 148.552 4.460 -999.990 -999.990 1.486 ..P WKT 2010 10 20 18 14 55 31.3200 -97.3300 251.000 30.0 147.897 4.750 -999.990 -999.990 1.479 ..P WKT 2010 10 20 18 19 55 31.3200 -97.3300 251.000 122.0 149.864 4.300 -999.990 -999.990 1.499 ..P WKT 2010 10 20 18 24 55 31.3200 -97.3300 251.000 457.0 144.480 4.360 -999.990 -999.990 1.445 ..P WKT 2010 10 20 18 29 55 31.3200 -97.3300 251.000 30.0 142.907 4.100 -999.990 -999.990 1.429 ..P WKT 2010 10 20 18 34 55 31.3200 -97.3300 251.000 122.0 141.336 5.570 -999.990 -999.990 1.413 ..P WKT 2010 10 20 18 39 55 31.3200 -97.3300 251.000 457.0 139.218 4.250 -999.990 -999.990 1.392 ..P WKT 2010 10 20 18 49 55 31.3200 -97.3300 251.000 30.0 123.704 4.210 -999.990 -999.990 1.237 ..P WKT 2010 10 20 18 54 55 31.3200 -97.3300 251.000 122.0 142.573 4.210 -999.990 -999.990 1.426 ..P WKT 2010 10 20 18 59 55 31.3200 -97.3300 251.000 457.0 136.800 4.580 -999.990 -999.990 1.368 ..P WKT 2010 10 20 19 04 55 31.3200 -97.3300 251.000 30.0 132.933 5.300 -999.990 -999.990 1.329 ..P WKT 2010 10 20 19 09 55 31.3200 -97.3300 251.000 122.0 141.864 4.660 -999.990 -999.990 1.419 ..P WKT 2010 10 20 19 14 55 31.3200 -97.3300 251.000 457.0 139.767 4.400 -999.990 -999.990 1.398 ..P WKT 2010 10 20 19 24 55 31.3200 -97.3300 251.000 30.0 135.241 4.740 -999.990 -999.990 1.352 ..P WKT 2010 10 20 19 29 55 31.3200 -97.3300 251.000 122.0 138.803 4.290 -999.990 -999.990 1.388 ..P WKT 2010 10 20 19 34 55 31.3200 -97.3300 251.000 457.0 132.971 5.170 -999.990 -999.990 1.330 ..P WKT 2010 10 20 19 39 55 31.3200 -97.3300 251.000 30.0 133.947 4.600 -999.990 -999.990 1.339 ..P WKT 2010 10 20 19 44 55 31.3200 -97.3300 251.000 122.0 139.416 5.070 -999.990 -999.990 1.394 ..P WKT 2010 10 20 19 49 55 31.3200 -97.3300 251.000 457.0 139.166 4.480 -999.990 -999.990 1.392 ..P WKT 2010 10 20 19 59 55 31.3200 -97.3300 251.000 30.0 133.824 5.730 -999.990 -999.990 1.338 ..P WKT 2010 10 20 20 04 55 31.3200 -97.3300 251.000 122.0 139.078 4.710 -999.990 -999.990 1.391 ..P WKT 2010 10 20 20 09 55 31.3200 -97.3300 251.000 457.0 137.254 4.900 -999.990 -999.990 1.373 ..P WKT 2010 10 20 20 14 55 31.3200 -97.3300 251.000 30.0 139.376 5.110 -999.990 -999.990 1.394 ..P WKT 2010 10 20 20 19 55 31.3200 -97.3300 251.000 122.0 138.232 4.620 -999.990 -999.990 1.382 ..P WKT 2010 10 20 20 24 55 31.3200 -97.3300 251.000 457.0 133.956 5.310 -999.990 -999.990 1.340 ..P WKT 2010 10 20 20 34 55 31.3200 -97.3300 251.000 30.0 136.258 4.330 -999.990 -999.990 1.363 ..P WKT 2010 10 20 20 39 55 31.3200 -97.3300 251.000 122.0 138.070 4.360 -999.990 -999.990 1.381 ..P WKT 2010 10 20 20 44 55 31.3200 -97.3300 251.000 457.0 133.619 4.020 -999.990 -999.990 1.336 ..P WKT 2010 10 20 20 49 55 31.3200 -97.3300 251.000 30.0 136.521 4.550 -999.990 -999.990 1.365 ..P WKT 2010 10 20 20 54 55 31.3200 -97.3300 251.000 122.0 145.820 3.960 -999.990 -999.990 1.458 ..P WKT 2010 10 20 20 59 55 31.3200 -97.3300 251.000 457.0 131.703 3.570 -999.990 -999.990 1.317 ..P WKT 2010 10 20 21 09 55 31.3200 -97.3300 251.000 30.0 136.358 4.770 -999.990 -999.990 1.364 ..P WKT 2010 10 20 21 14 55 31.3200 -97.3300 251.000 122.0 141.243 3.980 -999.990 -999.990 1.412 ..P WKT 2010 10 20 21 19 55 31.3200 -97.3300 251.000 457.0 138.504 3.980 -999.990 -999.990 1.385 ..P WKT 2010 10 20 21 24 55 31.3200 -97.3300 251.000 30.0 140.122 4.210 -999.990 -999.990 1.401 ..P WKT 2010 10 20 21 29 55 31.3200 -97.3300 251.000 122.0 142.555 3.870 -999.990 -999.990 1.426 ..P WKT 2010 10 20 21 34 55 31.3200 -97.3300 251.000 457.0 141.723 4.200 -999.990 -999.990 1.417 ..P WKT 2010 10 20 21 44 55 31.3200 -97.3300 251.000 30.0 139.784 3.980 -999.990 -999.990 1.398 ..P WKT 2010 10 20 21 49 55 31.3200 -97.3300 251.000 122.0 145.758 3.880 -999.990 -999.990 1.458 ..P WKT 2010 10 20 21 54 55 31.3200 -97.3300 251.000 457.0 143.836 4.230 -999.990 -999.990 1.438 ..P WKT 2010 10 20 21 59 55 31.3200 -97.3300 251.000 30.0 134.018 6.230 -999.990 -999.990 1.340 ..P WKT 2010 10 20 22 04 55 31.3200 -97.3300 251.000 122.0 140.808 4.160 -999.990 -999.990 1.408 ..P WKT 2010 10 20 22 09 55 31.3200 -97.3300 251.000 457.0 137.798 4.630 -999.990 -999.990 1.378 ..P WKT 2010 10 20 22 19 55 31.3200 -97.3300 251.000 30.0 137.337 4.120 -999.990 -999.990 1.373 ..P WKT 2010 10 20 22 24 55 31.3200 -97.3300 251.000 122.0 143.156 3.600 -999.990 -999.990 1.432 ..P WKT 2010 10 20 22 29 55 31.3200 -97.3300 251.000 457.0 138.627 4.150 -999.990 -999.990 1.386 ..P WKT 2010 10 20 22 34 55 31.3200 -97.3300 251.000 30.0 130.015 5.040 -999.990 -999.990 1.300 ..P WKT 2010 10 20 22 39 55 31.3200 -97.3300 251.000 122.0 139.373 5.510 -999.990 -999.990 1.394 ..P WKT 2010 10 20 22 44 55 31.3200 -97.3300 251.000 457.0 127.221 3.920 -999.990 -999.990 1.272 ..P WKT 2010 10 20 22 54 55 31.3200 -97.3300 251.000 30.0 134.248 3.500 -999.990 -999.990 1.342 ..P WKT 2010 10 20 22 59 55 31.3200 -97.3300 251.000 122.0 132.462 4.580 -999.990 -999.990 1.325 ..P WKT 2010 10 20 23 04 55 31.3200 -97.3300 251.000 457.0 133.126 5.940 -999.990 -999.990 1.331 ..P WKT 2010 10 20 23 09 55 31.3200 -97.3300 251.000 30.0 135.016 4.290 -999.990 -999.990 1.350 ..P WKT 2010 10 20 23 14 55 31.3200 -97.3300 251.000 122.0 140.989 4.190 -999.990 -999.990 1.410 ..P WKT 2010 10 20 23 19 55 31.3200 -97.3300 251.000 457.0 130.355 3.900 -999.990 -999.990 1.304 ..P WKT 2010 10 20 23 29 55 31.3200 -97.3300 251.000 30.0 142.885 3.980 -999.990 -999.990 1.429 ..P WKT 2010 10 20 23 34 55 31.3200 -97.3300 251.000 122.0 148.762 4.050 -999.990 -999.990 1.488 ..P WKT 2010 10 20 23 39 55 31.3200 -97.3300 251.000 457.0 131.088 3.840 -999.990 -999.990 1.311 ..P WKT 2010 10 20 23 44 55 31.3200 -97.3300 251.000 30.0 146.901 4.030 -999.990 -999.990 1.469 ..P WKT 2010 10 20 23 49 55 31.3200 -97.3300 251.000 122.0 151.280 4.330 -999.990 -999.990 1.513 ..P WKT 2010 10 21 00 09 55 31.3200 -97.3300 251.000 457.0 127.299 4.500 -999.990 -999.990 1.273 ..P WKT 2010 10 21 00 10 25 31.3200 -97.3300 251.000 457.0 130.005 4.450 -999.990 -999.990 1.300 ..P WKT 2010 10 21 00 10 55 31.3200 -97.3300 251.000 457.0 128.085 4.720 -999.990 -999.990 1.281 ..P WKT 2010 10 21 00 11 25 31.3200 -97.3300 251.000 457.0 132.969 5.140 -999.990 -999.990 1.330 ..P WKT 2010 10 21 00 11 55 31.3200 -97.3300 251.000 457.0 121.384 5.640 -999.990 -999.990 1.214 ..P WKT 2010 10 21 00 12 25 31.3200 -97.3300 251.000 457.0 132.393 4.940 -999.990 -999.990 1.324 ..P WKT 2010 10 21 00 12 55 31.3200 -97.3300 251.000 457.0 132.242 4.340 -999.990 -999.990 1.322 ..P WKT 2010 10 21 00 13 25 31.3200 -97.3300 251.000 457.0 127.871 4.790 -999.990 -999.990 1.279 ..P WKT 2010 10 21 00 13 55 31.3200 -97.3300 251.000 457.0 130.713 4.760 -999.990 -999.990 1.307 ..P WKT 2010 10 21 00 14 25 31.3200 -97.3300 251.000 457.0 130.018 4.250 -999.990 -999.990 1.300 ..P WKT 2010 10 21 00 14 55 31.3200 -97.3300 251.000 457.0 130.955 4.580 -999.990 -999.990 1.310 ..P WKT 2010 10 21 00 19 55 31.3200 -97.3300 251.000 30.0 142.367 5.220 -999.990 -999.990 1.424 ..P WKT 2010 10 21 00 24 55 31.3200 -97.3300 251.000 122.0 147.519 4.600 -999.990 -999.990 1.475 ..P WKT 2010 10 21 00 29 55 31.3200 -97.3300 251.000 457.0 130.354 4.770 -999.990 -999.990 1.304 ..P WKT 2010 10 21 00 34 55 31.3200 -97.3300 251.000 30.0 148.567 4.850 -999.990 -999.990 1.486 ..P WKT 2010 10 21 00 39 55 31.3200 -97.3300 251.000 122.0 149.364 4.390 -999.990 -999.990 1.494 ..P WKT 2010 10 21 00 44 55 31.3200 -97.3300 251.000 457.0 136.827 4.540 -999.990 -999.990 1.368 ..P WKT 2010 10 21 00 54 55 31.3200 -97.3300 251.000 30.0 139.723 4.860 -999.990 -999.990 1.397 ..P WKT 2010 10 21 00 59 55 31.3200 -97.3300 251.000 122.0 151.750 4.180 -999.990 -999.990 1.518 ..P WKT 2010 10 21 01 04 55 31.3200 -97.3300 251.000 457.0 131.135 4.290 -999.990 -999.990 1.311 ..P WKT 2010 10 21 01 09 55 31.3200 -97.3300 251.000 30.0 141.258 4.670 -999.990 -999.990 1.413 ..P WKT 2010 10 21 01 14 55 31.3200 -97.3300 251.000 122.0 150.835 3.860 -999.990 -999.990 1.508 ..P WKT 2010 10 21 01 19 55 31.3200 -97.3300 251.000 457.0 121.249 3.630 -999.990 -999.990 1.212 ..P WKT 2010 10 21 01 29 55 31.3200 -97.3300 251.000 30.0 150.113 3.880 -999.990 -999.990 1.501 ..P WKT 2010 10 21 01 34 55 31.3200 -97.3300 251.000 122.0 154.715 3.610 -999.990 -999.990 1.547 ..P WKT 2010 10 21 01 39 55 31.3200 -97.3300 251.000 457.0 126.691 3.610 -999.990 -999.990 1.267 ..P WKT 2010 10 21 01 44 55 31.3200 -97.3300 251.000 30.0 176.696 4.920 -999.990 -999.990 1.767 ..P WKT 2010 10 21 01 49 55 31.3200 -97.3300 251.000 122.0 150.304 4.100 -999.990 -999.990 1.503 ..P WKT 2010 10 21 01 54 55 31.3200 -97.3300 251.000 457.0 129.353 4.780 -999.990 -999.990 1.294 ..P WKT 2010 10 21 02 04 55 31.3200 -97.3300 251.000 30.0 151.058 4.390 -999.990 -999.990 1.511 ..P WKT 2010 10 21 02 09 55 31.3200 -97.3300 251.000 122.0 149.135 3.240 -999.990 -999.990 1.491 ..P WKT 2010 10 21 02 14 55 31.3200 -97.3300 251.000 457.0 133.625 3.330 -999.990 -999.990 1.336 ..P WKT 2010 10 21 02 19 55 31.3200 -97.3300 251.000 30.0 144.747 3.570 -999.990 -999.990 1.447 ..P WKT 2010 10 21 02 24 55 31.3200 -97.3300 251.000 122.0 151.792 3.810 -999.990 -999.990 1.518 ..P WKT 2010 10 21 02 29 55 31.3200 -97.3300 251.000 457.0 127.047 3.780 -999.990 -999.990 1.270 ..P WKT 2010 10 21 02 39 55 31.3200 -97.3300 251.000 30.0 154.448 3.430 -999.990 -999.990 1.544 ..P WKT 2010 10 21 02 44 55 31.3200 -97.3300 251.000 122.0 151.575 3.980 -999.990 -999.990 1.516 ..P WKT 2010 10 21 02 49 55 31.3200 -97.3300 251.000 457.0 151.826 3.720 -999.990 -999.990 1.518 ..P WKT 2010 10 21 02 54 55 31.3200 -97.3300 251.000 30.0 152.621 4.080 -999.990 -999.990 1.526 ..P WKT 2010 10 21 02 59 55 31.3200 -97.3300 251.000 122.0 157.081 3.820 -999.990 -999.990 1.571 ..P WKT 2010 10 21 03 04 55 31.3200 -97.3300 251.000 457.0 146.741 4.500 -999.990 -999.990 1.467 ..P WKT 2010 10 21 03 14 55 31.3200 -97.3300 251.000 30.0 166.057 4.080 -999.990 -999.990 1.661 ..P WKT 2010 10 21 03 19 55 31.3200 -97.3300 251.000 122.0 141.678 4.100 -999.990 -999.990 1.417 ..P WKT 2010 10 21 03 24 55 31.3200 -97.3300 251.000 457.0 146.622 4.060 -999.990 -999.990 1.466 ..P WKT 2010 10 21 03 29 55 31.3200 -97.3300 251.000 30.0 172.334 4.950 -999.990 -999.990 1.723 ..P WKT 2010 10 21 03 34 55 31.3200 -97.3300 251.000 122.0 146.738 4.490 -999.990 -999.990 1.467 ..P WKT 2010 10 21 03 39 55 31.3200 -97.3300 251.000 457.0 148.831 4.680 -999.990 -999.990 1.488 ..P WKT 2010 10 21 03 49 55 31.3200 -97.3300 251.000 30.0 170.851 4.810 -999.990 -999.990 1.709 ..P WKT 2010 10 21 03 54 55 31.3200 -97.3300 251.000 122.0 139.350 5.100 -999.990 -999.990 1.393 ..P WKT 2010 10 21 03 59 55 31.3200 -97.3300 251.000 457.0 156.969 4.900 -999.990 -999.990 1.570 ..P WKT 2010 10 21 04 04 55 31.3200 -97.3300 251.000 30.0 161.290 4.310 -999.990 -999.990 1.613 ..P WKT 2010 10 21 04 09 55 31.3200 -97.3300 251.000 122.0 146.210 6.040 -999.990 -999.990 1.462 ..P WKT 2010 10 21 04 14 55 31.3200 -97.3300 251.000 457.0 149.445 3.760 -999.990 -999.990 1.494 ..P WKT 2010 10 21 04 24 55 31.3200 -97.3300 251.000 30.0 154.443 4.200 -999.990 -999.990 1.544 ..P WKT 2010 10 21 04 29 55 31.3200 -97.3300 251.000 122.0 144.948 4.340 -999.990 -999.990 1.449 ..P WKT 2010 10 21 04 34 55 31.3200 -97.3300 251.000 457.0 158.509 4.770 -999.990 -999.990 1.585 ..P WKT 2010 10 21 04 39 55 31.3200 -97.3300 251.000 30.0 164.745 4.880 -999.990 -999.990 1.647 ..P WKT 2010 10 21 04 44 55 31.3200 -97.3300 251.000 122.0 138.167 4.410 -999.990 -999.990 1.382 ..P WKT 2010 10 21 04 49 55 31.3200 -97.3300 251.000 457.0 144.404 4.080 -999.990 -999.990 1.444 ..P WKT 2010 10 21 05 04 55 31.3200 -97.3300 251.000 30.0 145.449 4.610 -999.990 -999.990 1.454 ..P WKT 2010 10 21 05 09 55 31.3200 -97.3300 251.000 122.0 137.296 4.660 -999.990 -999.990 1.373 ..P WKT 2010 10 21 05 14 55 31.3200 -97.3300 251.000 457.0 140.258 4.800 -999.990 -999.990 1.403 ..P WKT 2010 10 21 05 19 55 31.3200 -97.3300 251.000 30.0 141.051 4.180 -999.990 -999.990 1.411 ..P WKT 2010 10 21 05 24 55 31.3200 -97.3300 251.000 122.0 139.948 3.690 -999.990 -999.990 1.399 ..P WKT 2010 10 21 05 29 55 31.3200 -97.3300 251.000 457.0 127.732 3.830 -999.990 -999.990 1.277 ..P WKT 2010 10 21 05 39 55 31.3200 -97.3300 251.000 30.0 151.077 3.900 -999.990 -999.990 1.511 ..P WKT 2010 10 21 05 44 55 31.3200 -97.3300 251.000 122.0 147.883 3.830 -999.990 -999.990 1.479 ..P WKT 2010 10 21 05 49 55 31.3200 -97.3300 251.000 457.0 117.865 4.040 -999.990 -999.990 1.179 ..P WKT 2010 10 21 05 54 55 31.3200 -97.3300 251.000 30.0 149.352 4.090 -999.990 -999.990 1.494 ..P WKT 2010 10 21 05 59 55 31.3200 -97.3300 251.000 122.0 134.509 4.150 -999.990 -999.990 1.345 ..P WKT 2010 10 21 06 04 55 31.3200 -97.3300 251.000 457.0 110.729 3.880 -999.990 -999.990 1.107 ..P WKT 2010 10 21 06 14 55 31.3200 -97.3300 251.000 30.0 147.318 3.740 -999.990 -999.990 1.473 ..P WKT 2010 10 21 06 19 55 31.3200 -97.3300 251.000 122.0 127.778 3.640 -999.990 -999.990 1.278 ..P WKT 2010 10 21 06 24 55 31.3200 -97.3300 251.000 457.0 110.407 4.510 -999.990 -999.990 1.104 ..P WKT 2010 10 21 06 29 55 31.3200 -97.3300 251.000 30.0 148.012 5.210 -999.990 -999.990 1.480 ..P WKT 2010 10 21 06 34 55 31.3200 -97.3300 251.000 122.0 119.540 4.550 -999.990 -999.990 1.195 ..P WKT 2010 10 21 06 39 55 31.3200 -97.3300 251.000 457.0 109.078 3.740 -999.990 -999.990 1.091 ..P WKT 2010 10 21 06 49 55 31.3200 -97.3300 251.000 30.0 154.255 4.130 -999.990 -999.990 1.543 ..P WKT 2010 10 21 06 54 55 31.3200 -97.3300 251.000 122.0 126.506 4.650 -999.990 -999.990 1.265 ..P WKT 2010 10 21 06 59 55 31.3200 -97.3300 251.000 457.0 119.875 5.230 -999.990 -999.990 1.199 ..P WKT 2010 10 21 07 04 55 31.3200 -97.3300 251.000 30.0 153.305 6.770 -999.990 -999.990 1.533 ..P WKT 2010 10 21 07 09 55 31.3200 -97.3300 251.000 122.0 129.350 5.720 -999.990 -999.990 1.293 ..P WKT 2010 10 21 07 14 55 31.3200 -97.3300 251.000 457.0 118.255 4.710 -999.990 -999.990 1.183 ..P WKT 2010 10 21 07 24 55 31.3200 -97.3300 251.000 30.0 155.561 4.900 -999.990 -999.990 1.556 ..P WKT 2010 10 21 07 29 55 31.3200 -97.3300 251.000 122.0 134.686 5.670 -999.990 -999.990 1.347 ..P WKT 2010 10 21 07 34 55 31.3200 -97.3300 251.000 457.0 126.802 6.410 -999.990 -999.990 1.268 ..P WKT 2010 10 21 07 39 55 31.3200 -97.3300 251.000 30.0 149.760 5.420 -999.990 -999.990 1.498 ..P WKT 2010 10 21 07 44 55 31.3200 -97.3300 251.000 122.0 137.006 5.660 -999.990 -999.990 1.370 ..P WKT 2010 10 21 07 49 55 31.3200 -97.3300 251.000 457.0 135.885 5.700 -999.990 -999.990 1.359 ..P WKT 2010 10 21 07 59 55 31.3200 -97.3300 251.000 30.0 139.209 5.420 -999.990 -999.990 1.392 ..P WKT 2010 10 21 08 04 55 31.3200 -97.3300 251.000 122.0 135.808 5.090 -999.990 -999.990 1.358 ..P WKT 2010 10 21 08 09 55 31.3200 -97.3300 251.000 457.0 119.022 5.060 -999.990 -999.990 1.190 ..P WKT 2010 10 21 08 14 55 31.3200 -97.3300 251.000 30.0 122.520 5.020 -999.990 -999.990 1.225 ..P WKT 2010 10 21 08 19 55 31.3200 -97.3300 251.000 122.0 141.565 5.540 -999.990 -999.990 1.416 ..P WKT 2010 10 21 08 24 55 31.3200 -97.3300 251.000 457.0 111.668 5.050 -999.990 -999.990 1.117 ..P WKT 2010 10 21 08 34 55 31.3200 -97.3300 251.000 30.0 129.340 4.720 -999.990 -999.990 1.293 ..P WKT 2010 10 21 08 39 55 31.3200 -97.3300 251.000 122.0 148.785 4.500 -999.990 -999.990 1.488 ..P WKT 2010 10 21 08 44 55 31.3200 -97.3300 251.000 457.0 108.084 6.110 -999.990 -999.990 1.081 ..P WKT 2010 10 21 08 49 55 31.3200 -97.3300 251.000 30.0 134.960 4.810 -999.990 -999.990 1.350 ..P WKT 2010 10 21 08 54 55 31.3200 -97.3300 251.000 122.0 146.428 6.610 -999.990 -999.990 1.464 ..P WKT 2010 10 21 08 59 55 31.3200 -97.3300 251.000 457.0 100.871 3.700 -999.990 -999.990 1.009 ..P WKT 2010 10 21 09 09 55 31.3200 -97.3300 251.000 30.0 148.066 4.130 -999.990 -999.990 1.481 ..P WKT 2010 10 21 09 14 55 31.3200 -97.3300 251.000 122.0 140.828 4.030 -999.990 -999.990 1.408 ..P WKT 2010 10 21 09 19 55 31.3200 -97.3300 251.000 457.0 100.090 5.170 -999.990 -999.990 1.001 ..P WKT 2010 10 21 09 24 55 31.3200 -97.3300 251.000 30.0 148.238 4.920 -999.990 -999.990 1.482 ..P WKT 2010 10 21 09 29 55 31.3200 -97.3300 251.000 122.0 138.570 5.810 -999.990 -999.990 1.386 ..P WKT 2010 10 21 09 34 55 31.3200 -97.3300 251.000 457.0 102.162 5.970 -999.990 -999.990 1.022 ..P WKT 2010 10 21 09 44 55 31.3200 -97.3300 251.000 30.0 139.399 3.840 -999.990 -999.990 1.394 ..P WKT 2010 10 21 09 49 55 31.3200 -97.3300 251.000 122.0 136.873 4.150 -999.990 -999.990 1.369 ..P WKT 2010 10 21 09 54 55 31.3200 -97.3300 251.000 457.0 109.501 3.760 -999.990 -999.990 1.095 ..P WKT 2010 10 21 09 59 55 31.3200 -97.3300 251.000 30.0 150.991 4.670 -999.990 -999.990 1.510 ..P WKT 2010 10 21 10 04 55 31.3200 -97.3300 251.000 122.0 136.853 4.270 -999.990 -999.990 1.369 ..P WKT 2010 10 21 10 09 55 31.3200 -97.3300 251.000 457.0 103.009 4.120 -999.990 -999.990 1.030 ..P WKT 2010 10 21 10 19 55 31.3200 -97.3300 251.000 30.0 146.340 4.530 -999.990 -999.990 1.463 ..P WKT 2010 10 21 10 24 55 31.3200 -97.3300 251.000 122.0 132.804 4.020 -999.990 -999.990 1.328 ..P WKT 2010 10 21 10 29 55 31.3200 -97.3300 251.000 457.0 97.948 5.620 -999.990 -999.990 0.979 ..P WKT 2010 10 21 10 34 55 31.3200 -97.3300 251.000 30.0 146.763 4.460 -999.990 -999.990 1.468 ..P WKT 2010 10 21 10 39 55 31.3200 -97.3300 251.000 122.0 125.943 5.660 -999.990 -999.990 1.259 ..P WKT 2010 10 21 10 44 55 31.3200 -97.3300 251.000 457.0 102.428 4.750 -999.990 -999.990 1.024 ..P WKT 2010 10 21 10 54 55 31.3200 -97.3300 251.000 30.0 147.126 5.210 -999.990 -999.990 1.471 ..P WKT 2010 10 21 10 59 55 31.3200 -97.3300 251.000 122.0 119.414 4.660 -999.990 -999.990 1.194 ..P WKT 2010 10 21 11 04 55 31.3200 -97.3300 251.000 457.0 107.217 4.570 -999.990 -999.990 1.072 ..P WKT 2010 10 21 11 09 55 31.3200 -97.3300 251.000 30.0 144.523 5.180 -999.990 -999.990 1.445 ..P WKT 2010 10 21 11 14 55 31.3200 -97.3300 251.000 122.0 108.589 4.680 -999.990 -999.990 1.086 ..P WKT 2010 10 21 11 19 55 31.3200 -97.3300 251.000 457.0 104.218 4.320 -999.990 -999.990 1.042 ..P WKT 2010 10 21 11 29 55 31.3200 -97.3300 251.000 30.0 139.171 5.320 -999.990 -999.990 1.392 ..P WKT 2010 10 21 11 34 55 31.3200 -97.3300 251.000 122.0 116.466 4.960 -999.990 -999.990 1.165 ..P WKT 2010 10 21 11 39 55 31.3200 -97.3300 251.000 457.0 106.303 4.500 -999.990 -999.990 1.063 ..P WKT 2010 10 21 11 44 55 31.3200 -97.3300 251.000 30.0 138.068 4.610 -999.990 -999.990 1.381 ..P WKT 2010 10 21 11 49 55 31.3200 -97.3300 251.000 122.0 115.233 4.530 -999.990 -999.990 1.152 ..P WKT 2010 10 21 12 09 55 31.3200 -97.3300 251.000 457.0 104.905 4.820 -999.990 -999.990 1.049 ..P WKT 2010 10 21 12 10 25 31.3200 -97.3300 251.000 457.0 106.218 4.740 -999.990 -999.990 1.062 ..P WKT 2010 10 21 12 10 55 31.3200 -97.3300 251.000 457.0 104.700 4.840 -999.990 -999.990 1.047 ..P WKT 2010 10 21 12 11 25 31.3200 -97.3300 251.000 457.0 103.856 4.670 -999.990 -999.990 1.039 ..P WKT 2010 10 21 12 11 55 31.3200 -97.3300 251.000 457.0 104.630 5.180 -999.990 -999.990 1.046 ..P WKT 2010 10 21 12 12 25 31.3200 -97.3300 251.000 457.0 103.517 5.020 -999.990 -999.990 1.035 ..P WKT 2010 10 21 12 12 55 31.3200 -97.3300 251.000 457.0 98.764 6.480 -999.990 -999.990 0.988 ..P WKT 2010 10 21 12 13 25 31.3200 -97.3300 251.000 457.0 94.010 4.980 -999.990 -999.990 0.940 ..P WKT 2010 10 21 12 13 55 31.3200 -97.3300 251.000 457.0 98.154 4.940 -999.990 -999.990 0.982 ..P WKT 2010 10 21 12 14 25 31.3200 -97.3300 251.000 457.0 103.512 4.900 -999.990 -999.990 1.035 ..P WKT 2010 10 21 12 14 55 31.3200 -97.3300 251.000 457.0 100.241 4.950 -999.990 -999.990 1.002 ..P WKT 2010 10 21 12 19 55 31.3200 -97.3300 251.000 30.0 124.021 4.860 -999.990 -999.990 1.240 ..P WKT 2010 10 21 12 24 55 31.3200 -97.3300 251.000 122.0 107.359 4.640 -999.990 -999.990 1.074 ..P WKT 2010 10 21 12 29 55 31.3200 -97.3300 251.000 457.0 105.122 4.310 -999.990 -999.990 1.051 ..P WKT 2010 10 21 12 34 55 31.3200 -97.3300 251.000 30.0 131.602 4.940 -999.990 -999.990 1.316 ..P WKT 2010 10 21 12 39 55 31.3200 -97.3300 251.000 122.0 110.488 4.610 -999.990 -999.990 1.105 ..P WKT 2010 10 21 12 44 55 31.3200 -97.3300 251.000 457.0 106.902 4.690 -999.990 -999.990 1.069 ..P WKT 2010 10 21 12 54 55 31.3200 -97.3300 251.000 30.0 139.295 4.620 -999.990 -999.990 1.393 ..P WKT 2010 10 21 12 59 55 31.3200 -97.3300 251.000 122.0 115.132 4.140 -999.990 -999.990 1.151 ..P WKT 2010 10 21 13 04 55 31.3200 -97.3300 251.000 457.0 94.205 4.320 -999.990 -999.990 0.942 ..P WKT 2010 10 21 13 09 55 31.3200 -97.3300 251.000 30.0 126.682 4.600 -999.990 -999.990 1.267 ..P WKT 2010 10 21 13 14 55 31.3200 -97.3300 251.000 122.0 114.114 4.430 -999.990 -999.990 1.141 ..P WKT 2010 10 21 13 19 55 31.3200 -97.3300 251.000 457.0 94.533 4.180 -999.990 -999.990 0.945 ..P WKT 2010 10 21 13 29 55 31.3200 -97.3300 251.000 30.0 126.161 5.520 -999.990 -999.990 1.262 ..P WKT 2010 10 21 13 34 55 31.3200 -97.3300 251.000 122.0 118.025 4.340 -999.990 -999.990 1.180 ..P WKT 2010 10 21 13 39 55 31.3200 -97.3300 251.000 457.0 92.890 4.270 -999.990 -999.990 0.929 ..P WKT 2010 10 21 13 44 55 31.3200 -97.3300 251.000 30.0 130.888 4.370 -999.990 -999.990 1.309 ..P WKT 2010 10 21 13 49 55 31.3200 -97.3300 251.000 122.0 124.908 4.340 -999.990 -999.990 1.249 ..P WKT 2010 10 21 13 54 55 31.3200 -97.3300 251.000 457.0 99.232 4.370 -999.990 -999.990 0.992 ..P WKT 2010 10 21 14 04 55 31.3200 -97.3300 251.000 30.0 120.692 4.650 -999.990 -999.990 1.207 ..P WKT 2010 10 21 14 09 55 31.3200 -97.3300 251.000 122.0 114.673 4.530 -999.990 -999.990 1.147 ..P WKT 2010 10 21 14 14 55 31.3200 -97.3300 251.000 457.0 102.177 4.460 -999.990 -999.990 1.022 ..P WKT 2010 10 21 14 19 55 31.3200 -97.3300 251.000 30.0 129.081 4.600 -999.990 -999.990 1.291 ..P WKT 2010 10 21 14 24 55 31.3200 -97.3300 251.000 122.0 114.155 4.650 -999.990 -999.990 1.142 ..P WKT 2010 10 21 14 29 55 31.3200 -97.3300 251.000 457.0 102.198 5.580 -999.990 -999.990 1.022 ..P WKT 2010 10 21 14 39 55 31.3200 -97.3300 251.000 30.0 134.172 5.560 -999.990 -999.990 1.342 ..P WKT 2010 10 21 14 44 55 31.3200 -97.3300 251.000 122.0 118.318 5.300 -999.990 -999.990 1.183 ..P WKT 2010 10 21 14 49 55 31.3200 -97.3300 251.000 457.0 101.113 5.130 -999.990 -999.990 1.011 ..P WKT 2010 10 21 14 54 55 31.3200 -97.3300 251.000 30.0 122.241 5.540 -999.990 -999.990 1.222 ..P WKT 2010 10 21 14 59 55 31.3200 -97.3300 251.000 122.0 117.994 5.120 -999.990 -999.990 1.180 ..P WKT 2010 10 21 15 04 55 31.3200 -97.3300 251.000 457.0 97.008 5.550 -999.990 -999.990 0.970 ..P WKT 2010 10 21 15 14 55 31.3200 -97.3300 251.000 30.0 110.496 5.340 -999.990 -999.990 1.105 ..P WKT 2010 10 21 15 19 55 31.3200 -97.3300 251.000 122.0 111.088 4.920 -999.990 -999.990 1.111 ..P WKT 2010 10 21 15 24 55 31.3200 -97.3300 251.000 457.0 99.394 4.880 -999.990 -999.990 0.994 ..P WKT 2010 10 21 15 29 55 31.3200 -97.3300 251.000 30.0 108.357 5.070 -999.990 -999.990 1.084 ..P WKT 2010 10 21 15 34 55 31.3200 -97.3300 251.000 122.0 116.376 4.420 -999.990 -999.990 1.164 ..P WKT 2010 10 21 15 39 55 31.3200 -97.3300 251.000 457.0 101.035 5.010 -999.990 -999.990 1.010 ..P WKT 2010 10 21 15 49 55 31.3200 -97.3300 251.000 30.0 117.846 4.770 -999.990 -999.990 1.178 ..P WKT 2010 10 21 15 54 55 31.3200 -97.3300 251.000 122.0 125.152 5.030 -999.990 -999.990 1.252 ..P WKT 2010 10 21 15 59 55 31.3200 -97.3300 251.000 457.0 102.883 4.720 -999.990 -999.990 1.029 ..P WKT 2010 10 21 16 04 55 31.3200 -97.3300 251.000 30.0 130.717 6.740 -999.990 -999.990 1.307 ..P WKT 2010 10 21 16 09 55 31.3200 -97.3300 251.000 122.0 115.876 4.490 -999.990 -999.990 1.159 ..P WKT 2010 10 21 16 14 55 31.3200 -97.3300 251.000 457.0 101.979 4.710 -999.990 -999.990 1.020 ..P WKT 2010 10 21 16 24 55 31.3200 -97.3300 251.000 30.0 117.751 4.680 -999.990 -999.990 1.178 ..P WKT 2010 10 21 16 29 55 31.3200 -97.3300 251.000 122.0 122.435 4.850 -999.990 -999.990 1.224 ..P WKT 2010 10 21 16 34 55 31.3200 -97.3300 251.000 457.0 113.205 4.830 -999.990 -999.990 1.132 ..P WKT 2010 10 21 16 39 55 31.3200 -97.3300 251.000 30.0 119.511 5.960 -999.990 -999.990 1.195 ..P WKT 2010 10 21 16 44 55 31.3200 -97.3300 251.000 122.0 115.279 5.280 -999.990 -999.990 1.153 ..P WKT 2010 10 21 16 49 55 31.3200 -97.3300 251.000 457.0 113.749 4.930 -999.990 -999.990 1.137 ..P WKT 2010 10 21 17 04 55 31.3200 -97.3300 251.000 30.0 116.666 5.190 -999.990 -999.990 1.167 ..P WKT 2010 10 21 17 09 55 31.3200 -97.3300 251.000 122.0 123.215 5.270 -999.990 -999.990 1.232 ..P WKT 2010 10 21 17 14 55 31.3200 -97.3300 251.000 457.0 113.278 5.050 -999.990 -999.990 1.133 ..P WKT 2010 10 21 17 19 55 31.3200 -97.3300 251.000 30.0 105.502 5.160 -999.990 -999.990 1.055 ..P WKT 2010 10 21 17 24 55 31.3200 -97.3300 251.000 122.0 108.538 4.940 -999.990 -999.990 1.085 ..P WKT 2010 10 21 17 29 55 31.3200 -97.3300 251.000 457.0 108.870 5.010 -999.990 -999.990 1.089 ..P WKT 2010 10 21 17 39 55 31.3200 -97.3300 251.000 30.0 102.825 5.060 -999.990 -999.990 1.028 ..P WKT 2010 10 21 17 44 55 31.3200 -97.3300 251.000 122.0 110.234 4.990 -999.990 -999.990 1.102 ..P WKT 2010 10 21 17 49 55 31.3200 -97.3300 251.000 457.0 110.344 5.000 -999.990 -999.990 1.103 ..P WKT 2010 10 21 17 54 55 31.3200 -97.3300 251.000 30.0 108.561 5.420 -999.990 -999.990 1.086 ..P WKT 2010 10 21 17 59 55 31.3200 -97.3300 251.000 122.0 108.672 4.800 -999.990 -999.990 1.087 ..P WKT 2010 10 21 18 04 55 31.3200 -97.3300 251.000 457.0 100.131 4.810 -999.990 -999.990 1.001 ..P WKT 2010 10 21 18 14 55 31.3200 -97.3300 251.000 30.0 107.033 5.450 -999.990 -999.990 1.070 ..P WKT 2010 10 21 18 19 55 31.3200 -97.3300 251.000 122.0 104.092 5.070 -999.990 -999.990 1.041 ..P WKT 2010 10 21 18 24 55 31.3200 -97.3300 251.000 457.0 102.368 5.760 -999.990 -999.990 1.024 ..P WKT 2010 10 21 18 29 55 31.3200 -97.3300 251.000 30.0 106.862 6.650 -999.990 -999.990 1.069 ..P WKT 2010 10 21 18 34 55 31.3200 -97.3300 251.000 122.0 109.735 5.750 -999.990 -999.990 1.097 ..P WKT 2010 10 21 18 39 55 31.3200 -97.3300 251.000 457.0 101.519 5.020 -999.990 -999.990 1.015 ..P WKT 2010 10 21 18 49 55 31.3200 -97.3300 251.000 30.0 102.763 5.010 -999.990 -999.990 1.028 ..P WKT 2010 10 21 18 54 55 31.3200 -97.3300 251.000 122.0 107.896 5.910 -999.990 -999.990 1.079 ..P WKT 2010 10 21 18 59 55 31.3200 -97.3300 251.000 457.0 106.133 6.510 -999.990 -999.990 1.061 ..P WKT 2010 10 21 19 04 55 31.3200 -97.3300 251.000 30.0 106.398 6.650 -999.990 -999.990 1.064 ..P WKT 2010 10 21 19 09 55 31.3200 -97.3300 251.000 122.0 110.585 5.990 -999.990 -999.990 1.106 ..P WKT 2010 10 21 19 14 55 31.3200 -97.3300 251.000 457.0 108.415 5.970 -999.990 -999.990 1.084 ..P WKT 2010 10 21 19 24 55 31.3200 -97.3300 251.000 30.0 112.423 5.120 -999.990 -999.990 1.124 ..P WKT 2010 10 21 19 29 55 31.3200 -97.3300 251.000 122.0 111.026 6.200 -999.990 -999.990 1.110 ..P WKT 2010 10 21 19 34 55 31.3200 -97.3300 251.000 457.0 114.094 6.870 -999.990 -999.990 1.141 ..P WKT 2010 10 21 19 39 55 31.3200 -97.3300 251.000 30.0 108.774 6.120 -999.990 -999.990 1.088 ..P WKT 2010 10 21 19 44 55 31.3200 -97.3300 251.000 122.0 114.817 5.510 -999.990 -999.990 1.148 ..P WKT 2010 10 21 19 49 55 31.3200 -97.3300 251.000 457.0 114.773 5.300 -999.990 -999.990 1.148 ..P WKT 2010 10 21 19 59 55 31.3200 -97.3300 251.000 30.0 109.486 5.120 -999.990 -999.990 1.095 ..P WKT 2010 10 21 20 04 55 31.3200 -97.3300 251.000 122.0 113.713 5.140 -999.990 -999.990 1.137 ..P WKT 2010 10 21 20 09 55 31.3200 -97.3300 251.000 457.0 116.047 5.260 -999.990 -999.990 1.160 ..P WKT 2010 10 21 20 14 55 31.3200 -97.3300 251.000 30.0 113.509 5.660 -999.990 -999.990 1.135 ..P WKT 2010 10 21 20 19 55 31.3200 -97.3300 251.000 122.0 117.331 5.280 -999.990 -999.990 1.173 ..P WKT 2010 10 21 20 24 55 31.3200 -97.3300 251.000 457.0 115.741 6.390 -999.990 -999.990 1.157 ..P WKT 2010 10 21 20 34 55 31.3200 -97.3300 251.000 30.0 116.891 5.240 -999.990 -999.990 1.169 ..P WKT 2010 10 21 20 39 55 31.3200 -97.3300 251.000 122.0 119.360 5.280 -999.990 -999.990 1.194 ..P WKT 2010 10 21 20 44 55 31.3200 -97.3300 251.000 457.0 114.792 6.010 -999.990 -999.990 1.148 ..P WKT 2010 10 21 20 49 55 31.3200 -97.3300 251.000 30.0 106.704 5.520 -999.990 -999.990 1.067 ..P WKT 2010 10 21 20 54 55 31.3200 -97.3300 251.000 122.0 111.339 6.260 -999.990 -999.990 1.113 ..P WKT 2010 10 21 20 59 55 31.3200 -97.3300 251.000 457.0 107.582 5.310 -999.990 -999.990 1.076 ..P WKT 2010 10 21 21 09 55 31.3200 -97.3300 251.000 30.0 109.505 5.630 -999.990 -999.990 1.095 ..P WKT 2010 10 21 21 14 55 31.3200 -97.3300 251.000 122.0 113.019 5.310 -999.990 -999.990 1.130 ..P WKT 2010 10 21 21 19 55 31.3200 -97.3300 251.000 457.0 109.223 5.680 -999.990 -999.990 1.092 ..P WKT 2010 10 21 21 24 55 31.3200 -97.3300 251.000 30.0 105.156 5.680 -999.990 -999.990 1.052 ..P WKT 2010 10 21 21 29 55 31.3200 -97.3300 251.000 122.0 115.711 5.770 -999.990 -999.990 1.157 ..P WKT 2010 10 21 21 34 55 31.3200 -97.3300 251.000 457.0 110.831 5.220 -999.990 -999.990 1.108 ..P WKT 2010 10 21 21 44 55 31.3200 -97.3300 251.000 30.0 102.695 5.290 -999.990 -999.990 1.027 ..P WKT 2010 10 21 21 49 55 31.3200 -97.3300 251.000 122.0 115.690 5.320 -999.990 -999.990 1.157 ..P WKT 2010 10 21 21 54 55 31.3200 -97.3300 251.000 457.0 113.518 5.560 -999.990 -999.990 1.135 ..P WKT 2010 10 21 21 59 55 31.3200 -97.3300 251.000 30.0 109.450 5.430 -999.990 -999.990 1.095 ..P WKT 2010 10 21 22 04 55 31.3200 -97.3300 251.000 122.0 110.798 5.750 -999.990 -999.990 1.108 ..P WKT 2010 10 21 22 09 55 31.3200 -97.3300 251.000 457.0 110.793 5.510 -999.990 -999.990 1.108 ..P WKT 2010 10 21 22 19 55 31.3200 -97.3300 251.000 30.0 100.913 6.490 -999.990 -999.990 1.009 ..P WKT 2010 10 21 22 24 55 31.3200 -97.3300 251.000 122.0 107.565 5.550 -999.990 -999.990 1.076 ..P WKT 2010 10 21 22 29 55 31.3200 -97.3300 251.000 457.0 101.212 5.260 -999.990 -999.990 1.012 ..P WKT 2010 10 21 22 34 55 31.3200 -97.3300 251.000 30.0 100.548 5.850 -999.990 -999.990 1.005 ..P WKT 2010 10 21 22 39 55 31.3200 -97.3300 251.000 122.0 113.296 5.370 -999.990 -999.990 1.133 ..P WKT 2010 10 21 22 44 55 31.3200 -97.3300 251.000 457.0 109.651 5.280 -999.990 -999.990 1.097 ..P WKT 2010 10 21 22 54 55 31.3200 -97.3300 251.000 30.0 117.557 5.420 -999.990 -999.990 1.176 ..P WKT 2010 10 21 22 59 55 31.3200 -97.3300 251.000 122.0 113.390 6.020 -999.990 -999.990 1.134 ..P WKT 2010 10 21 23 04 55 31.3200 -97.3300 251.000 457.0 107.869 6.030 -999.990 -999.990 1.079 ..P WKT 2010 10 21 23 09 55 31.3200 -97.3300 251.000 30.0 112.102 5.810 -999.990 -999.990 1.121 ..P WKT 2010 10 21 23 14 55 31.3200 -97.3300 251.000 122.0 112.000 5.630 -999.990 -999.990 1.120 ..P WKT 2010 10 21 23 19 55 31.3200 -97.3300 251.000 457.0 109.865 6.390 -999.990 -999.990 1.099 ..P WKT 2010 10 21 23 29 55 31.3200 -97.3300 251.000 30.0 114.992 5.590 -999.990 -999.990 1.150 ..P WKT 2010 10 21 23 34 55 31.3200 -97.3300 251.000 122.0 120.221 5.770 -999.990 -999.990 1.202 ..P WKT 2010 10 21 23 39 55 31.3200 -97.3300 251.000 457.0 112.711 5.740 -999.990 -999.990 1.127 ..P WKT 2010 10 21 23 44 55 31.3200 -97.3300 251.000 30.0 112.926 5.880 -999.990 -999.990 1.129 ..P WKT 2010 10 21 23 49 55 31.3200 -97.3300 251.000 122.0 111.243 5.600 -999.990 -999.990 1.112 ..P WKT 2010 10 22 00 09 55 31.3200 -97.3300 251.000 457.0 101.056 5.290 -999.990 -999.990 1.011 ..P WKT 2010 10 22 00 10 25 31.3200 -97.3300 251.000 457.0 102.763 5.420 -999.990 -999.990 1.028 ..P WKT 2010 10 22 00 10 55 31.3200 -97.3300 251.000 457.0 102.435 5.260 -999.990 -999.990 1.024 ..P WKT 2010 10 22 00 11 25 31.3200 -97.3300 251.000 457.0 101.024 5.480 -999.990 -999.990 1.010 ..P WKT 2010 10 22 00 11 55 31.3200 -97.3300 251.000 457.0 98.121 5.530 -999.990 -999.990 0.981 ..P WKT 2010 10 22 00 12 25 31.3200 -97.3300 251.000 457.0 104.031 5.330 -999.990 -999.990 1.040 ..P WKT 2010 10 22 00 12 55 31.3200 -97.3300 251.000 457.0 105.195 5.320 -999.990 -999.990 1.052 ..P WKT 2010 10 22 00 13 25 31.3200 -97.3300 251.000 457.0 103.512 5.380 -999.990 -999.990 1.035 ..P WKT 2010 10 22 00 13 55 31.3200 -97.3300 251.000 457.0 101.965 5.570 -999.990 -999.990 1.020 ..P WKT 2010 10 22 00 14 25 31.3200 -97.3300 251.000 457.0 99.875 5.330 -999.990 -999.990 0.999 ..P WKT 2010 10 22 00 14 55 31.3200 -97.3300 251.000 457.0 102.801 5.670 -999.990 -999.990 1.028 ..P WKT 2010 10 22 00 19 55 31.3200 -97.3300 251.000 30.0 107.260 5.720 -999.990 -999.990 1.073 ..P WKT 2010 10 22 00 24 55 31.3200 -97.3300 251.000 122.0 104.395 5.410 -999.990 -999.990 1.044 ..P WKT 2010 10 22 00 29 55 31.3200 -97.3300 251.000 457.0 100.851 5.470 -999.990 -999.990 1.009 ..P WKT 2010 10 22 00 34 55 31.3200 -97.3300 251.000 30.0 103.276 5.860 -999.990 -999.990 1.033 ..P WKT 2010 10 22 00 39 55 31.3200 -97.3300 251.000 122.0 110.044 5.380 -999.990 -999.990 1.100 ..P WKT 2010 10 22 00 44 55 31.3200 -97.3300 251.000 457.0 101.884 5.930 -999.990 -999.990 1.019 ..P WKT 2010 10 22 00 54 55 31.3200 -97.3300 251.000 30.0 102.229 6.000 -999.990 -999.990 1.022 ..P WKT 2010 10 22 00 59 55 31.3200 -97.3300 251.000 122.0 121.056 5.660 -999.990 -999.990 1.211 ..P WKT 2010 10 22 01 04 55 31.3200 -97.3300 251.000 457.0 115.989 6.990 -999.990 -999.990 1.160 ..P WKT 2010 10 22 01 09 55 31.3200 -97.3300 251.000 30.0 119.069 6.010 -999.990 -999.990 1.191 ..P WKT 2010 10 22 01 14 55 31.3200 -97.3300 251.000 122.0 105.579 5.980 -999.990 -999.990 1.056 ..P WKT 2010 10 22 01 19 55 31.3200 -97.3300 251.000 457.0 119.255 5.730 -999.990 -999.990 1.193 ..P WKT 2010 10 22 01 29 55 31.3200 -97.3300 251.000 30.0 114.471 5.440 -999.990 -999.990 1.145 ..P WKT 2010 10 22 01 34 55 31.3200 -97.3300 251.000 122.0 100.625 5.330 -999.990 -999.990 1.006 ..P WKT 2010 10 22 01 39 55 31.3200 -97.3300 251.000 457.0 116.947 5.940 -999.990 -999.990 1.169 ..P WKT 2010 10 22 01 44 55 31.3200 -97.3300 251.000 30.0 111.253 5.400 -999.990 -999.990 1.113 ..P WKT 2010 10 22 01 49 55 31.3200 -97.3300 251.000 122.0 103.927 5.670 -999.990 -999.990 1.039 ..P WKT 2010 10 22 01 54 55 31.3200 -97.3300 251.000 457.0 127.054 5.300 -999.990 -999.990 1.271 ..P WKT 2010 10 22 02 04 55 31.3200 -97.3300 251.000 30.0 107.191 5.280 -999.990 -999.990 1.072 ..P WKT 2010 10 22 02 09 55 31.3200 -97.3300 251.000 122.0 101.454 5.220 -999.990 -999.990 1.015 ..P WKT 2010 10 22 02 14 55 31.3200 -97.3300 251.000 457.0 102.516 5.280 -999.990 -999.990 1.025 ..P WKT 2010 10 22 02 19 55 31.3200 -97.3300 251.000 30.0 101.130 5.510 -999.990 -999.990 1.011 ..P WKT 2010 10 22 02 24 55 31.3200 -97.3300 251.000 122.0 105.458 7.920 -999.990 -999.990 1.055 ..P WKT 2010 10 22 02 29 55 31.3200 -97.3300 251.000 457.0 99.308 5.210 -999.990 -999.990 0.993 ..P WKT 2010 10 22 02 39 55 31.3200 -97.3300 251.000 30.0 110.438 5.230 -999.990 -999.990 1.104 ..P WKT 2010 10 22 02 44 55 31.3200 -97.3300 251.000 122.0 110.568 5.360 -999.990 -999.990 1.106 ..P WKT 2010 10 22 02 49 55 31.3200 -97.3300 251.000 457.0 104.163 5.880 -999.990 -999.990 1.042 ..P WKT 2010 10 22 02 54 55 31.3200 -97.3300 251.000 30.0 111.920 5.440 -999.990 -999.990 1.119 ..P WKT 2010 10 22 02 59 55 31.3200 -97.3300 251.000 122.0 108.918 5.720 -999.990 -999.990 1.089 ..P WKT 2010 10 22 03 04 55 31.3200 -97.3300 251.000 457.0 97.880 5.400 -999.990 -999.990 0.979 ..P WKT 2010 10 22 03 14 55 31.3200 -97.3300 251.000 30.0 106.488 6.780 -999.990 -999.990 1.065 ..P WKT 2010 10 22 03 19 55 31.3200 -97.3300 251.000 122.0 105.431 5.800 -999.990 -999.990 1.054 ..P WKT 2010 10 22 03 24 55 31.3200 -97.3300 251.000 457.0 96.469 5.620 -999.990 -999.990 0.965 ..P WKT 2010 10 22 03 29 55 31.3200 -97.3300 251.000 30.0 109.450 5.970 -999.990 -999.990 1.095 ..P WKT 2010 10 22 03 34 55 31.3200 -97.3300 251.000 122.0 111.937 5.700 -999.990 -999.990 1.119 ..P WKT 2010 10 22 03 39 55 31.3200 -97.3300 251.000 457.0 104.199 5.780 -999.990 -999.990 1.042 ..P WKT 2010 10 22 03 49 55 31.3200 -97.3300 251.000 30.0 114.493 6.220 -999.990 -999.990 1.145 ..P WKT 2010 10 22 03 54 55 31.3200 -97.3300 251.000 122.0 110.845 5.930 -999.990 -999.990 1.108 ..P WKT 2010 10 22 03 59 55 31.3200 -97.3300 251.000 457.0 102.966 6.230 -999.990 -999.990 1.030 ..P WKT 2010 10 22 04 04 55 31.3200 -97.3300 251.000 30.0 102.726 5.690 -999.990 -999.990 1.027 ..P WKT 2010 10 22 04 09 55 31.3200 -97.3300 251.000 122.0 102.759 5.860 -999.990 -999.990 1.028 ..P WKT 2010 10 22 04 14 55 31.3200 -97.3300 251.000 457.0 110.297 6.890 -999.990 -999.990 1.103 ..P WKT 2010 10 22 04 24 55 31.3200 -97.3300 251.000 30.0 96.227 5.800 -999.990 -999.990 0.962 ..P WKT 2010 10 22 04 29 55 31.3200 -97.3300 251.000 122.0 101.504 5.670 -999.990 -999.990 1.015 ..P WKT 2010 10 22 04 34 55 31.3200 -97.3300 251.000 457.0 111.699 6.150 -999.990 -999.990 1.117 ..P WKT 2010 10 22 04 39 55 31.3200 -97.3300 251.000 30.0 109.880 5.600 -999.990 -999.990 1.099 ..P WKT 2010 10 22 04 44 55 31.3200 -97.3300 251.000 122.0 110.246 5.950 -999.990 -999.990 1.102 ..P WKT 2010 10 22 04 49 55 31.3200 -97.3300 251.000 457.0 104.328 5.770 -999.990 -999.990 1.043 ..P WKT 2010 10 22 05 04 55 31.3200 -97.3300 251.000 30.0 104.583 5.880 -999.990 -999.990 1.046 ..P WKT 2010 10 22 05 09 55 31.3200 -97.3300 251.000 122.0 106.577 5.480 -999.990 -999.990 1.066 ..P WKT 2010 10 22 05 14 55 31.3200 -97.3300 251.000 457.0 101.466 5.750 -999.990 -999.990 1.015 ..P WKT 2010 10 22 05 19 55 31.3200 -97.3300 251.000 30.0 104.008 5.710 -999.990 -999.990 1.040 ..P WKT 2010 10 22 05 24 55 31.3200 -97.3300 251.000 122.0 104.089 5.380 -999.990 -999.990 1.041 ..P WKT 2010 10 22 05 29 55 31.3200 -97.3300 251.000 457.0 111.829 5.500 -999.990 -999.990 1.118 ..P WKT 2010 10 22 05 39 55 31.3200 -97.3300 251.000 30.0 106.533 6.460 -999.990 -999.990 1.065 ..P WKT 2010 10 22 05 44 55 31.3200 -97.3300 251.000 122.0 107.719 5.570 -999.990 -999.990 1.077 ..P WKT 2010 10 22 05 49 55 31.3200 -97.3300 251.000 457.0 108.632 5.710 -999.990 -999.990 1.086 ..P WKT 2010 10 22 05 54 55 31.3200 -97.3300 251.000 30.0 113.924 5.350 -999.990 -999.990 1.139 ..P WKT 2010 10 22 05 59 55 31.3200 -97.3300 251.000 122.0 108.543 6.240 -999.990 -999.990 1.085 ..P WKT 2010 10 22 06 04 55 31.3200 -97.3300 251.000 457.0 112.193 5.800 -999.990 -999.990 1.122 ..P WKT 2010 10 22 06 14 55 31.3200 -97.3300 251.000 30.0 102.834 5.510 -999.990 -999.990 1.028 ..P WKT 2010 10 22 06 19 55 31.3200 -97.3300 251.000 122.0 110.632 6.470 -999.990 -999.990 1.106 ..P WKT 2010 10 22 06 24 55 31.3200 -97.3300 251.000 457.0 107.204 5.990 -999.990 -999.990 1.072 ..P WKT 2010 10 22 06 29 55 31.3200 -97.3300 251.000 30.0 117.606 6.720 -999.990 -999.990 1.176 ..P WKT 2010 10 22 06 34 55 31.3200 -97.3300 251.000 122.0 115.136 6.030 -999.990 -999.990 1.151 ..P WKT 2010 10 22 06 39 55 31.3200 -97.3300 251.000 457.0 114.035 5.550 -999.990 -999.990 1.140 ..P WKT 2010 10 22 06 49 55 31.3200 -97.3300 251.000 30.0 114.691 5.850 -999.990 -999.990 1.147 ..P WKT 2010 10 22 06 54 55 31.3200 -97.3300 251.000 122.0 116.722 6.350 -999.990 -999.990 1.167 ..P WKT 2010 10 22 06 59 55 31.3200 -97.3300 251.000 457.0 105.733 6.500 -999.990 -999.990 1.057 ..P WKT 2010 10 22 07 04 55 31.3200 -97.3300 251.000 30.0 107.352 6.820 -999.990 -999.990 1.074 ..P WKT 2010 10 22 07 09 55 31.3200 -97.3300 251.000 122.0 109.658 6.960 -999.990 -999.990 1.097 ..P WKT 2010 10 22 07 14 55 31.3200 -97.3300 251.000 457.0 99.624 6.670 -999.990 -999.990 0.996 ..P WKT 2010 10 22 07 24 55 31.3200 -97.3300 251.000 30.0 103.078 6.440 -999.990 -999.990 1.031 ..P WKT 2010 10 22 07 29 55 31.3200 -97.3300 251.000 122.0 109.577 6.370 -999.990 -999.990 1.096 ..P WKT 2010 10 22 07 34 55 31.3200 -97.3300 251.000 457.0 105.653 8.670 -999.990 -999.990 1.057 ..P WKT 2010 10 22 07 39 55 31.3200 -97.3300 251.000 30.0 112.428 6.450 -999.990 -999.990 1.124 ..P WKT 2010 10 22 07 44 55 31.3200 -97.3300 251.000 122.0 114.404 6.080 -999.990 -999.990 1.144 ..P WKT 2010 10 22 07 49 55 31.3200 -97.3300 251.000 457.0 109.105 6.140 -999.990 -999.990 1.091 ..P WKT 2010 10 22 07 59 55 31.3200 -97.3300 251.000 30.0 110.447 5.460 -999.990 -999.990 1.104 ..P WKT 2010 10 22 08 04 55 31.3200 -97.3300 251.000 122.0 114.757 5.690 -999.990 -999.990 1.148 ..P WKT 2010 10 22 08 09 55 31.3200 -97.3300 251.000 457.0 101.491 5.830 -999.990 -999.990 1.015 ..P WKT 2010 10 22 08 14 55 31.3200 -97.3300 251.000 30.0 110.195 5.290 -999.990 -999.990 1.102 ..P WKT 2010 10 22 08 19 55 31.3200 -97.3300 251.000 122.0 115.605 5.560 -999.990 -999.990 1.156 ..P WKT 2010 10 22 08 24 55 31.3200 -97.3300 251.000 457.0 103.983 5.310 -999.990 -999.990 1.040 ..P WKT 2010 10 22 08 34 55 31.3200 -97.3300 251.000 30.0 113.059 5.350 -999.990 -999.990 1.131 ..P WKT 2010 10 22 08 39 55 31.3200 -97.3300 251.000 122.0 113.977 5.590 -999.990 -999.990 1.140 ..P WKT 2010 10 22 08 44 55 31.3200 -97.3300 251.000 457.0 104.724 6.170 -999.990 -999.990 1.047 ..P WKT 2010 10 22 08 49 55 31.3200 -97.3300 251.000 30.0 112.514 5.810 -999.990 -999.990 1.125 ..P WKT 2010 10 22 08 54 55 31.3200 -97.3300 251.000 122.0 119.481 6.640 -999.990 -999.990 1.195 ..P WKT 2010 10 22 08 59 55 31.3200 -97.3300 251.000 457.0 108.300 5.380 -999.990 -999.990 1.083 ..P WKT 2010 10 22 09 09 55 31.3200 -97.3300 251.000 30.0 117.877 5.360 -999.990 -999.990 1.179 ..P WKT 2010 10 22 09 14 55 31.3200 -97.3300 251.000 122.0 116.634 5.530 -999.990 -999.990 1.166 ..P WKT 2010 10 22 09 19 55 31.3200 -97.3300 251.000 457.0 104.386 6.170 -999.990 -999.990 1.044 ..P WKT 2010 10 22 09 24 55 31.3200 -97.3300 251.000 30.0 118.277 5.620 -999.990 -999.990 1.183 ..P WKT 2010 10 22 09 29 55 31.3200 -97.3300 251.000 122.0 119.510 6.010 -999.990 -999.990 1.195 ..P WKT 2010 10 22 09 34 55 31.3200 -97.3300 251.000 457.0 101.478 5.500 -999.990 -999.990 1.015 ..P WKT 2010 10 22 09 44 55 31.3200 -97.3300 251.000 30.0 129.606 6.070 -999.990 -999.990 1.296 ..P WKT 2010 10 22 09 49 55 31.3200 -97.3300 251.000 122.0 117.960 5.470 -999.990 -999.990 1.180 ..P WKT 2010 10 22 09 54 55 31.3200 -97.3300 251.000 457.0 108.237 5.500 -999.990 -999.990 1.082 ..P WKT 2010 10 22 09 59 55 31.3200 -97.3300 251.000 30.0 121.099 6.070 -999.990 -999.990 1.211 ..P WKT 2010 10 22 10 04 55 31.3200 -97.3300 251.000 122.0 124.046 6.570 -999.990 -999.990 1.240 ..P WKT 2010 10 22 10 09 55 31.3200 -97.3300 251.000 457.0 104.128 5.810 -999.990 -999.990 1.041 ..P WKT 2010 10 22 10 19 55 31.3200 -97.3300 251.000 30.0 129.153 6.400 -999.990 -999.990 1.292 ..P WKT 2010 10 22 10 24 55 31.3200 -97.3300 251.000 122.0 118.441 6.100 -999.990 -999.990 1.184 ..P WKT 2010 10 22 10 29 55 31.3200 -97.3300 251.000 457.0 108.277 5.870 -999.990 -999.990 1.083 ..P WKT 2010 10 22 10 34 55 31.3200 -97.3300 251.000 30.0 132.157 5.960 -999.990 -999.990 1.322 ..P WKT 2010 10 22 10 39 55 31.3200 -97.3300 251.000 122.0 125.163 6.260 -999.990 -999.990 1.252 ..P WKT 2010 10 22 10 44 55 31.3200 -97.3300 251.000 457.0 105.620 5.900 -999.990 -999.990 1.056 ..P WKT 2010 10 22 10 54 55 31.3200 -97.3300 251.000 30.0 129.152 5.990 -999.990 -999.990 1.292 ..P WKT 2010 10 22 10 59 55 31.3200 -97.3300 251.000 122.0 120.243 5.860 -999.990 -999.990 1.202 ..P WKT 2010 10 22 11 04 55 31.3200 -97.3300 251.000 457.0 107.468 5.740 -999.990 -999.990 1.075 ..P WKT 2010 10 22 11 09 55 31.3200 -97.3300 251.000 30.0 120.905 5.560 -999.990 -999.990 1.209 ..P WKT 2010 10 22 11 14 55 31.3200 -97.3300 251.000 122.0 120.822 5.530 -999.990 -999.990 1.208 ..P WKT 2010 10 22 11 19 55 31.3200 -97.3300 251.000 457.0 99.762 5.620 -999.990 -999.990 0.998 ..P WKT 2010 10 22 11 29 55 31.3200 -97.3300 251.000 30.0 128.627 5.580 -999.990 -999.990 1.286 ..P WKT 2010 10 22 11 34 55 31.3200 -97.3300 251.000 122.0 117.685 5.980 -999.990 -999.990 1.177 ..P WKT 2010 10 22 11 39 55 31.3200 -97.3300 251.000 457.0 102.735 5.830 -999.990 -999.990 1.027 ..P WKT 2010 10 22 11 44 55 31.3200 -97.3300 251.000 30.0 130.041 5.570 -999.990 -999.990 1.300 ..P WKT 2010 10 22 11 49 55 31.3200 -97.3300 251.000 122.0 122.824 5.740 -999.990 -999.990 1.228 ..P WKT 2010 10 22 12 09 55 31.3200 -97.3300 251.000 457.0 99.599 6.180 -999.990 -999.990 0.996 ..P WKT 2010 10 22 12 10 25 31.3200 -97.3300 251.000 457.0 100.370 5.950 -999.990 -999.990 1.004 ..P WKT 2010 10 22 12 10 55 31.3200 -97.3300 251.000 457.0 96.445 5.850 -999.990 -999.990 0.964 ..P WKT 2010 10 22 12 11 25 31.3200 -97.3300 251.000 457.0 93.073 6.110 -999.990 -999.990 0.931 ..P WKT 2010 10 22 12 11 55 31.3200 -97.3300 251.000 457.0 104.894 8.490 -999.990 -999.990 1.049 ..P WKT 2010 10 22 12 12 25 31.3200 -97.3300 251.000 457.0 108.152 7.040 -999.990 -999.990 1.082 ..P WKT 2010 10 22 12 12 55 31.3200 -97.3300 251.000 457.0 104.780 5.940 -999.990 -999.990 1.048 ..P WKT 2010 10 22 12 13 25 31.3200 -97.3300 251.000 457.0 103.618 6.000 -999.990 -999.990 1.036 ..P WKT 2010 10 22 12 13 55 31.3200 -97.3300 251.000 457.0 100.521 5.930 -999.990 -999.990 1.005 ..P WKT 2010 10 22 12 14 25 31.3200 -97.3300 251.000 457.0 103.503 5.880 -999.990 -999.990 1.035 ..P WKT 2010 10 22 12 14 55 31.3200 -97.3300 251.000 457.0 99.578 5.920 -999.990 -999.990 0.996 ..P WKT 2010 10 22 12 19 55 31.3200 -97.3300 251.000 30.0 121.655 6.200 -999.990 -999.990 1.217 ..P WKT 2010 10 22 12 24 55 31.3200 -97.3300 251.000 122.0 115.003 6.250 -999.990 -999.990 1.150 ..P WKT 2010 10 22 12 29 55 31.3200 -97.3300 251.000 457.0 98.136 6.980 -999.990 -999.990 0.981 ..P WKT 2010 10 22 12 34 55 31.3200 -97.3300 251.000 30.0 117.168 6.480 -999.990 -999.990 1.172 ..P WKT 2010 10 22 12 39 55 31.3200 -97.3300 251.000 122.0 113.557 6.200 -999.990 -999.990 1.136 ..P WKT 2010 10 22 12 44 55 31.3200 -97.3300 251.000 457.0 99.455 5.890 -999.990 -999.990 0.995 ..P WKT 2010 10 22 12 54 55 31.3200 -97.3300 251.000 30.0 126.085 5.660 -999.990 -999.990 1.261 ..P WKT 2010 10 22 12 59 55 31.3200 -97.3300 251.000 122.0 126.787 6.890 -999.990 -999.990 1.268 ..P WKT 2010 10 22 13 04 55 31.3200 -97.3300 251.000 457.0 104.308 6.840 -999.990 -999.990 1.043 ..P WKT 2010 10 22 13 09 55 31.3200 -97.3300 251.000 30.0 126.811 6.700 -999.990 -999.990 1.268 ..P WKT 2010 10 22 13 14 55 31.3200 -97.3300 251.000 122.0 128.617 6.480 -999.990 -999.990 1.286 ..P WKT 2010 10 22 13 19 55 31.3200 -97.3300 251.000 457.0 101.453 6.310 -999.990 -999.990 1.015 ..P WKT 2010 10 22 13 29 55 31.3200 -97.3300 251.000 30.0 134.306 6.520 -999.990 -999.990 1.343 ..P WKT 2010 10 22 13 34 55 31.3200 -97.3300 251.000 122.0 130.870 7.020 -999.990 -999.990 1.309 ..P WKT 2010 10 22 13 39 55 31.3200 -97.3300 251.000 457.0 105.096 6.540 -999.990 -999.990 1.051 ..P WKT 2010 10 22 13 44 55 31.3200 -97.3300 251.000 30.0 132.548 6.060 -999.990 -999.990 1.325 ..P WKT 2010 10 22 13 49 55 31.3200 -97.3300 251.000 122.0 125.804 5.520 -999.990 -999.990 1.258 ..P WKT 2010 10 22 13 54 55 31.3200 -97.3300 251.000 457.0 105.277 5.770 -999.990 -999.990 1.053 ..P WKT 2010 10 22 14 04 55 31.3200 -97.3300 251.000 30.0 121.528 5.730 -999.990 -999.990 1.215 ..P WKT 2010 10 22 14 09 55 31.3200 -97.3300 251.000 122.0 125.911 5.500 -999.990 -999.990 1.259 ..P WKT 2010 10 22 14 14 55 31.3200 -97.3300 251.000 457.0 99.840 5.440 -999.990 -999.990 0.998 ..P WKT 2010 10 22 14 19 55 31.3200 -97.3300 251.000 30.0 127.234 5.660 -999.990 -999.990 1.272 ..P WKT 2010 10 22 14 24 55 31.3200 -97.3300 251.000 122.0 120.732 5.420 -999.990 -999.990 1.207 ..P WKT 2010 10 22 14 29 55 31.3200 -97.3300 251.000 457.0 104.037 6.290 -999.990 -999.990 1.040 ..P WKT 2010 10 22 14 39 55 31.3200 -97.3300 251.000 30.0 119.352 5.520 -999.990 -999.990 1.194 ..P WKT 2010 10 22 14 44 55 31.3200 -97.3300 251.000 122.0 118.303 5.990 -999.990 -999.990 1.183 ..P WKT 2010 10 22 14 49 55 31.3200 -97.3300 251.000 457.0 103.759 5.420 -999.990 -999.990 1.038 ..P WKT 2010 10 22 14 54 55 31.3200 -97.3300 251.000 30.0 120.196 5.490 -999.990 -999.990 1.202 ..P WKT 2010 10 22 14 59 55 31.3200 -97.3300 251.000 122.0 122.038 5.830 -999.990 -999.990 1.220 ..P WKT 2010 10 22 15 04 55 31.3200 -97.3300 251.000 457.0 101.441 5.930 -999.990 -999.990 1.014 ..P WKT 2010 10 22 15 14 55 31.3200 -97.3300 251.000 30.0 112.579 6.890 -999.990 -999.990 1.126 ..P WKT 2010 10 22 15 19 55 31.3200 -97.3300 251.000 122.0 117.055 5.550 -999.990 -999.990 1.171 ..P WKT 2010 10 22 15 24 55 31.3200 -97.3300 251.000 457.0 98.963 5.890 -999.990 -999.990 0.990 ..P WKT 2010 10 22 15 29 55 31.3200 -97.3300 251.000 30.0 115.134 5.790 -999.990 -999.990 1.151 ..P WKT 2010 10 22 15 34 55 31.3200 -97.3300 251.000 122.0 123.049 5.610 -999.990 -999.990 1.230 ..P WKT 2010 10 22 15 39 55 31.3200 -97.3300 251.000 457.0 99.597 5.630 -999.990 -999.990 0.996 ..P WKT 2010 10 22 15 49 55 31.3200 -97.3300 251.000 30.0 119.352 6.390 -999.990 -999.990 1.194 ..P WKT 2010 10 22 15 54 55 31.3200 -97.3300 251.000 122.0 118.127 5.700 -999.990 -999.990 1.181 ..P WKT 2010 10 22 15 59 55 31.3200 -97.3300 251.000 457.0 99.163 5.880 -999.990 -999.990 0.992 ..P WKT 2010 10 22 16 04 55 31.3200 -97.3300 251.000 30.0 111.415 6.190 -999.990 -999.990 1.114 ..P WKT 2010 10 22 16 09 55 31.3200 -97.3300 251.000 122.0 114.591 5.950 -999.990 -999.990 1.146 ..P WKT 2010 10 22 16 14 55 31.3200 -97.3300 251.000 457.0 96.320 5.540 -999.990 -999.990 0.963 ..P WKT 2010 10 22 16 24 55 31.3200 -97.3300 251.000 30.0 104.832 5.320 -999.990 -999.990 1.048 ..P WKT 2010 10 22 16 29 55 31.3200 -97.3300 251.000 122.0 111.816 5.860 -999.990 -999.990 1.118 ..P WKT 2010 10 22 16 34 55 31.3200 -97.3300 251.000 457.0 103.408 7.010 -999.990 -999.990 1.034 ..P WKT 2010 10 22 16 39 55 31.3200 -97.3300 251.000 30.0 105.169 7.970 -999.990 -999.990 1.052 ..P WKT 2010 10 22 16 44 55 31.3200 -97.3300 251.000 122.0 112.151 7.210 -999.990 -999.990 1.122 ..P WKT 2010 10 22 16 49 55 31.3200 -97.3300 251.000 457.0 98.799 6.070 -999.990 -999.990 0.988 ..P WKT 2010 10 22 17 04 55 31.3200 -97.3300 251.000 30.0 100.756 6.980 -999.990 -999.990 1.008 ..P WKT 2010 10 22 17 09 55 31.3200 -97.3300 251.000 122.0 101.128 7.780 -999.990 -999.990 1.011 ..P WKT 2010 10 22 17 14 55 31.3200 -97.3300 251.000 457.0 102.874 8.460 -999.990 -999.990 1.029 ..P WKT 2010 10 22 17 19 55 31.3200 -97.3300 251.000 30.0 99.126 7.330 -999.990 -999.990 0.991 ..P WKT 2010 10 22 17 24 55 31.3200 -97.3300 251.000 122.0 102.244 5.910 -999.990 -999.990 1.022 ..P WKT 2010 10 22 17 29 55 31.3200 -97.3300 251.000 457.0 105.362 5.470 -999.990 -999.990 1.054 ..P WKT 2010 10 22 17 39 55 31.3200 -97.3300 251.000 30.0 104.395 5.550 -999.990 -999.990 1.044 ..P WKT 2010 10 22 17 44 55 31.3200 -97.3300 251.000 122.0 111.565 5.750 -999.990 -999.990 1.116 ..P WKT 2010 10 22 17 49 55 31.3200 -97.3300 251.000 457.0 100.895 5.980 -999.990 -999.990 1.009 ..P WKT 2010 10 22 17 54 55 31.3200 -97.3300 251.000 30.0 107.789 6.100 -999.990 -999.990 1.078 ..P WKT 2010 10 22 17 59 55 31.3200 -97.3300 251.000 122.0 106.999 6.020 -999.990 -999.990 1.070 ..P WKT 2010 10 22 18 04 55 31.3200 -97.3300 251.000 457.0 102.643 6.410 -999.990 -999.990 1.026 ..P WKT 2010 10 22 18 14 55 31.3200 -97.3300 251.000 30.0 102.770 6.490 -999.990 -999.990 1.028 ..P WKT 2010 10 22 18 19 55 31.3200 -97.3300 251.000 122.0 107.525 6.350 -999.990 -999.990 1.075 ..P WKT 2010 10 22 18 24 55 31.3200 -97.3300 251.000 457.0 103.640 6.380 -999.990 -999.990 1.036 ..P WKT 2010 10 22 18 29 55 31.3200 -97.3300 251.000 30.0 105.789 6.380 -999.990 -999.990 1.058 ..P WKT 2010 10 22 18 34 55 31.3200 -97.3300 251.000 122.0 106.567 6.180 -999.990 -999.990 1.066 ..P WKT 2010 10 22 18 39 55 31.3200 -97.3300 251.000 457.0 104.329 6.210 -999.990 -999.990 1.043 ..P WKT 2010 10 22 18 49 55 31.3200 -97.3300 251.000 30.0 105.610 6.220 -999.990 -999.990 1.056 ..P WKT 2010 10 22 18 54 55 31.3200 -97.3300 251.000 122.0 111.458 6.020 -999.990 -999.990 1.115 ..P WKT 2010 10 22 18 59 55 31.3200 -97.3300 251.000 457.0 106.068 5.950 -999.990 -999.990 1.061 ..P WKT 2010 10 22 19 04 55 31.3200 -97.3300 251.000 30.0 99.721 5.830 -999.990 -999.990 0.997 ..P WKT 2010 10 22 19 09 55 31.3200 -97.3300 251.000 122.0 104.609 5.720 -999.990 -999.990 1.046 ..P WKT 2010 10 22 19 14 55 31.3200 -97.3300 251.000 457.0 97.577 5.640 -999.990 -999.990 0.976 ..P WKT 2010 10 22 19 24 55 31.3200 -97.3300 251.000 30.0 99.896 5.660 -999.990 -999.990 0.999 ..P WKT 2010 10 22 19 29 55 31.3200 -97.3300 251.000 122.0 107.873 5.440 -999.990 -999.990 1.079 ..P WKT 2010 10 22 19 34 55 31.3200 -97.3300 251.000 457.0 99.279 6.770 -999.990 -999.990 0.993 ..P WKT 2010 10 22 19 39 55 31.3200 -97.3300 251.000 30.0 103.558 5.270 -999.990 -999.990 1.036 ..P WKT 2010 10 22 19 44 55 31.3200 -97.3300 251.000 122.0 104.824 5.150 -999.990 -999.990 1.048 ..P WKT 2010 10 22 19 49 55 31.3200 -97.3300 251.000 457.0 104.583 4.940 -999.990 -999.990 1.046 ..P WKT 2010 10 22 19 59 55 31.3200 -97.3300 251.000 30.0 93.995 4.950 -999.990 -999.990 0.940 ..P WKT 2010 10 22 20 04 55 31.3200 -97.3300 251.000 122.0 95.417 5.260 -999.990 -999.990 0.954 ..P WKT 2010 10 22 20 09 55 31.3200 -97.3300 251.000 457.0 92.461 4.990 -999.990 -999.990 0.925 ..P WKT 2010 10 22 20 14 55 31.3200 -97.3300 251.000 30.0 94.978 4.910 -999.990 -999.990 0.950 ..P WKT 2010 10 22 20 19 55 31.3200 -97.3300 251.000 122.0 96.400 5.130 -999.990 -999.990 0.964 ..P WKT 2010 10 22 20 24 55 31.3200 -97.3300 251.000 457.0 95.634 5.220 -999.990 -999.990 0.956 ..P WKT 2010 10 22 20 34 55 31.3200 -97.3300 251.000 30.0 101.115 5.030 -999.990 -999.990 1.011 ..P WKT 2010 10 22 20 39 55 31.3200 -97.3300 251.000 122.0 100.797 5.590 -999.990 -999.990 1.008 ..P WKT 2010 10 22 20 44 55 31.3200 -97.3300 251.000 457.0 99.112 5.020 -999.990 -999.990 0.991 ..P WKT 2010 10 22 20 49 55 31.3200 -97.3300 251.000 30.0 103.716 5.280 -999.990 -999.990 1.037 ..P WKT 2010 10 22 20 54 55 31.3200 -97.3300 251.000 122.0 105.860 5.310 -999.990 -999.990 1.059 ..P WKT 2010 10 22 20 59 55 31.3200 -97.3300 251.000 457.0 100.893 4.830 -999.990 -999.990 1.009 ..P WKT 2010 10 22 21 09 55 31.3200 -97.3300 251.000 30.0 96.860 4.810 -999.990 -999.990 0.969 ..P WKT 2010 10 22 21 14 55 31.3200 -97.3300 251.000 122.0 100.799 5.370 -999.990 -999.990 1.008 ..P WKT 2010 10 22 21 19 55 31.3200 -97.3300 251.000 457.0 94.625 5.460 -999.990 -999.990 0.946 ..P WKT 2010 10 22 21 24 55 31.3200 -97.3300 251.000 30.0 96.924 5.690 -999.990 -999.990 0.969 ..P WKT 2010 10 22 21 29 55 31.3200 -97.3300 251.000 122.0 95.943 5.320 -999.990 -999.990 0.959 ..P WKT 2010 10 22 21 34 55 31.3200 -97.3300 251.000 457.0 97.695 5.290 -999.990 -999.990 0.977 ..P WKT 2010 10 22 21 44 55 31.3200 -97.3300 251.000 30.0 98.505 4.940 -999.990 -999.990 0.985 ..P WKT 2010 10 22 21 49 55 31.3200 -97.3300 251.000 122.0 103.573 5.270 -999.990 -999.990 1.036 ..P WKT 2010 10 22 21 54 55 31.3200 -97.3300 251.000 457.0 103.587 5.750 -999.990 -999.990 1.036 ..P WKT 2010 10 22 21 59 55 31.3200 -97.3300 251.000 30.0 103.601 6.090 -999.990 -999.990 1.036 ..P WKT 2010 10 22 22 04 55 31.3200 -97.3300 251.000 122.0 98.563 5.610 -999.990 -999.990 0.986 ..P WKT 2010 10 22 22 09 55 31.3200 -97.3300 251.000 457.0 93.253 7.410 -999.990 -999.990 0.933 ..P WKT 2010 10 22 22 19 55 31.3200 -97.3300 251.000 30.0 95.604 6.870 -999.990 -999.990 0.956 ..P WKT 2010 10 22 22 24 55 31.3200 -97.3300 251.000 122.0 100.395 6.510 -999.990 -999.990 1.004 ..P WKT 2010 10 22 22 29 55 31.3200 -97.3300 251.000 457.0 94.269 5.880 -999.990 -999.990 0.943 ..P WKT 2010 10 22 22 34 55 31.3200 -97.3300 251.000 30.0 97.013 5.920 -999.990 -999.990 0.970 ..P WKT 2010 10 22 22 39 55 31.3200 -97.3300 251.000 122.0 96.755 5.110 -999.990 -999.990 0.968 ..P WKT 2010 10 22 22 44 55 31.3200 -97.3300 251.000 457.0 92.677 4.940 -999.990 -999.990 0.927 ..P WKT 2010 10 22 22 54 55 31.3200 -97.3300 251.000 30.0 93.369 5.650 -999.990 -999.990 0.934 ..P WKT 2010 10 22 22 59 55 31.3200 -97.3300 251.000 122.0 94.729 4.770 -999.990 -999.990 0.947 ..P WKT 2010 10 22 23 04 55 31.3200 -97.3300 251.000 457.0 95.270 4.980 -999.990 -999.990 0.953 ..P WKT 2010 10 22 23 09 55 31.3200 -97.3300 251.000 30.0 93.220 7.100 -999.990 -999.990 0.932 ..P WKT 2010 10 22 23 14 55 31.3200 -97.3300 251.000 122.0 96.896 5.100 -999.990 -999.990 0.969 ..P WKT 2010 10 22 23 19 55 31.3200 -97.3300 251.000 457.0 94.574 5.700 -999.990 -999.990 0.946 ..P WKT 2010 10 22 23 29 55 31.3200 -97.3300 251.000 30.0 90.424 5.300 -999.990 -999.990 0.904 ..P WKT 2010 10 22 23 34 55 31.3200 -97.3300 251.000 122.0 99.774 5.600 -999.990 -999.990 0.998 ..P WKT 2010 10 22 23 39 55 31.3200 -97.3300 251.000 457.0 94.948 5.360 -999.990 -999.990 0.949 ..P WKT 2010 10 22 23 44 55 31.3200 -97.3300 251.000 30.0 96.391 5.920 -999.990 -999.990 0.964 ..P WKT 2010 10 22 23 49 55 31.3200 -97.3300 251.000 122.0 101.922 5.360 -999.990 -999.990 1.019 ..P WKT 2010 10 23 00 09 55 31.3200 -97.3300 251.000 457.0 95.594 5.470 -999.990 -999.990 0.956 ..P WKT 2010 10 23 00 10 25 31.3200 -97.3300 251.000 457.0 99.092 5.120 -999.990 -999.990 0.991 ..P WKT 2010 10 23 00 10 55 31.3200 -97.3300 251.000 457.0 100.410 5.670 -999.990 -999.990 1.004 ..P WKT 2010 10 23 00 11 25 31.3200 -97.3300 251.000 457.0 95.732 5.240 -999.990 -999.990 0.957 ..P WKT 2010 10 23 00 11 55 31.3200 -97.3300 251.000 457.0 96.777 5.290 -999.990 -999.990 0.968 ..P WKT 2010 10 23 00 12 25 31.3200 -97.3300 251.000 457.0 99.185 5.160 -999.990 -999.990 0.992 ..P WKT 2010 10 23 00 12 55 31.3200 -97.3300 251.000 457.0 94.780 6.550 -999.990 -999.990 0.948 ..P WKT 2010 10 23 00 13 25 31.3200 -97.3300 251.000 457.0 93.100 5.590 -999.990 -999.990 0.931 ..P WKT 2010 10 23 00 13 55 31.3200 -97.3300 251.000 457.0 92.510 5.470 -999.990 -999.990 0.925 ..P WKT 2010 10 23 00 14 25 31.3200 -97.3300 251.000 457.0 94.100 5.140 -999.990 -999.990 0.941 ..P WKT 2010 10 23 00 14 55 31.3200 -97.3300 251.000 457.0 95.146 5.050 -999.990 -999.990 0.951 ..P WKT 2010 10 23 00 19 55 31.3200 -97.3300 251.000 30.0 100.694 6.120 -999.990 -999.990 1.007 ..P WKT 2010 10 23 00 24 55 31.3200 -97.3300 251.000 122.0 110.605 5.380 -999.990 -999.990 1.106 ..P WKT 2010 10 23 00 29 55 31.3200 -97.3300 251.000 457.0 98.162 5.310 -999.990 -999.990 0.982 ..P WKT 2010 10 23 00 34 55 31.3200 -97.3300 251.000 30.0 100.986 5.680 -999.990 -999.990 1.010 ..P WKT 2010 10 23 00 39 55 31.3200 -97.3300 251.000 122.0 97.811 4.890 -999.990 -999.990 0.978 ..P WKT 2010 10 23 00 44 55 31.3200 -97.3300 251.000 457.0 93.818 5.070 -999.990 -999.990 0.938 ..P WKT 2010 10 23 00 54 55 31.3200 -97.3300 251.000 30.0 91.661 4.910 -999.990 -999.990 0.917 ..P WKT 2010 10 23 00 59 55 31.3200 -97.3300 251.000 122.0 103.590 4.830 -999.990 -999.990 1.036 ..P WKT 2010 10 23 01 04 55 31.3200 -97.3300 251.000 457.0 96.426 5.280 -999.990 -999.990 0.964 ..P WKT 2010 10 23 01 09 55 31.3200 -97.3300 251.000 30.0 97.445 4.870 -999.990 -999.990 0.974 ..P WKT 2010 10 23 01 14 55 31.3200 -97.3300 251.000 122.0 100.648 4.840 -999.990 -999.990 1.006 ..P WKT 2010 10 23 01 19 55 31.3200 -97.3300 251.000 457.0 91.572 6.680 -999.990 -999.990 0.916 ..P WKT 2010 10 23 01 29 55 31.3200 -97.3300 251.000 30.0 92.636 4.760 -999.990 -999.990 0.926 ..P WKT 2010 10 23 01 34 55 31.3200 -97.3300 251.000 122.0 102.779 4.860 -999.990 -999.990 1.028 ..P WKT 2010 10 23 01 39 55 31.3200 -97.3300 251.000 457.0 96.001 4.880 -999.990 -999.990 0.960 ..P WKT 2010 10 23 01 44 55 31.3200 -97.3300 251.000 30.0 98.229 4.870 -999.990 -999.990 0.982 ..P WKT 2010 10 23 01 49 55 31.3200 -97.3300 251.000 122.0 108.377 5.360 -999.990 -999.990 1.084 ..P WKT 2010 10 23 01 54 55 31.3200 -97.3300 251.000 457.0 89.992 5.490 -999.990 -999.990 0.900 ..P WKT 2010 10 23 02 04 55 31.3200 -97.3300 251.000 30.0 101.804 5.650 -999.990 -999.990 1.018 ..P WKT 2010 10 23 02 09 55 31.3200 -97.3300 251.000 122.0 106.747 6.190 -999.990 -999.990 1.067 ..P WKT 2010 10 23 02 14 55 31.3200 -97.3300 251.000 457.0 96.257 5.910 -999.990 -999.990 0.963 ..P WKT 2010 10 23 02 19 55 31.3200 -97.3300 251.000 30.0 106.253 5.450 -999.990 -999.990 1.063 ..P WKT 2010 10 23 02 24 55 31.3200 -97.3300 251.000 122.0 107.646 5.600 -999.990 -999.990 1.076 ..P WKT 2010 10 23 02 29 55 31.3200 -97.3300 251.000 457.0 100.705 5.450 -999.990 -999.990 1.007 ..P WKT 2010 10 23 02 39 55 31.3200 -97.3300 251.000 30.0 103.451 5.160 -999.990 -999.990 1.035 ..P WKT 2010 10 23 02 44 55 31.3200 -97.3300 251.000 122.0 110.954 5.250 -999.990 -999.990 1.110 ..P WKT 2010 10 23 02 49 55 31.3200 -97.3300 251.000 457.0 111.489 5.380 -999.990 -999.990 1.115 ..P WKT 2010 10 23 02 54 55 31.3200 -97.3300 251.000 30.0 109.153 5.520 -999.990 -999.990 1.092 ..P WKT 2010 10 23 02 59 55 31.3200 -97.3300 251.000 122.0 111.328 5.190 -999.990 -999.990 1.113 ..P WKT 2010 10 23 03 04 55 31.3200 -97.3300 251.000 457.0 101.883 5.510 -999.990 -999.990 1.019 ..P WKT 2010 10 23 03 14 55 31.3200 -97.3300 251.000 30.0 102.600 5.140 -999.990 -999.990 1.026 ..P WKT 2010 10 23 03 19 55 31.3200 -97.3300 251.000 122.0 107.568 5.280 -999.990 -999.990 1.076 ..P WKT 2010 10 23 03 24 55 31.3200 -97.3300 251.000 457.0 101.597 5.720 -999.990 -999.990 1.016 ..P WKT 2010 10 23 03 29 55 31.3200 -97.3300 251.000 30.0 103.968 6.960 -999.990 -999.990 1.040 ..P WKT 2010 10 23 03 34 55 31.3200 -97.3300 251.000 122.0 103.876 5.740 -999.990 -999.990 1.039 ..P WKT 2010 10 23 03 39 55 31.3200 -97.3300 251.000 457.0 91.337 5.240 -999.990 -999.990 0.913 ..P WKT 2010 10 23 03 49 55 31.3200 -97.3300 251.000 30.0 97.427 5.220 -999.990 -999.990 0.974 ..P WKT 2010 10 23 03 54 55 31.3200 -97.3300 251.000 122.0 103.337 6.140 -999.990 -999.990 1.033 ..P WKT 2010 10 23 03 59 55 31.3200 -97.3300 251.000 457.0 94.878 5.860 -999.990 -999.990 0.949 ..P WKT 2010 10 23 04 04 55 31.3200 -97.3300 251.000 30.0 97.915 6.110 -999.990 -999.990 0.979 ..P WKT 2010 10 23 04 09 55 31.3200 -97.3300 251.000 122.0 93.561 5.440 -999.990 -999.990 0.936 ..P WKT 2010 10 23 04 14 55 31.3200 -97.3300 251.000 457.0 100.704 5.710 -999.990 -999.990 1.007 ..P WKT 2010 10 23 04 24 55 31.3200 -97.3300 251.000 30.0 98.468 5.230 -999.990 -999.990 0.985 ..P WKT 2010 10 23 04 29 55 31.3200 -97.3300 251.000 122.0 103.599 5.730 -999.990 -999.990 1.036 ..P WKT 2010 10 23 04 34 55 31.3200 -97.3300 251.000 457.0 95.859 5.640 -999.990 -999.990 0.959 ..P WKT 2010 10 23 04 39 55 31.3200 -97.3300 251.000 30.0 97.430 5.830 -999.990 -999.990 0.974 ..P WKT 2010 10 23 04 44 55 31.3200 -97.3300 251.000 122.0 109.137 5.250 -999.990 -999.990 1.091 ..P WKT 2010 10 23 04 49 55 31.3200 -97.3300 251.000 457.0 104.683 5.570 -999.990 -999.990 1.047 ..P WKT 2010 10 23 05 04 55 31.3200 -97.3300 251.000 30.0 112.845 5.050 -999.990 -999.990 1.128 ..P WKT 2010 10 23 05 09 55 31.3200 -97.3300 251.000 122.0 109.016 5.240 -999.990 -999.990 1.090 ..P WKT 2010 10 23 05 14 55 31.3200 -97.3300 251.000 457.0 98.882 5.910 -999.990 -999.990 0.989 ..P WKT 2010 10 23 05 19 55 31.3200 -97.3300 251.000 30.0 106.290 4.960 -999.990 -999.990 1.063 ..P WKT 2010 10 23 05 24 55 31.3200 -97.3300 251.000 122.0 109.587 4.950 -999.990 -999.990 1.096 ..P WKT 2010 10 23 05 29 55 31.3200 -97.3300 251.000 457.0 97.805 4.970 -999.990 -999.990 0.978 ..P WKT 2010 10 23 05 39 55 31.3200 -97.3300 251.000 30.0 108.492 5.530 -999.990 -999.990 1.085 ..P WKT 2010 10 23 05 44 55 31.3200 -97.3300 251.000 122.0 105.189 5.030 -999.990 -999.990 1.052 ..P WKT 2010 10 23 05 49 55 31.3200 -97.3300 251.000 457.0 105.588 5.950 -999.990 -999.990 1.056 ..P WKT 2010 10 23 05 54 55 31.3200 -97.3300 251.000 30.0 104.478 5.480 -999.990 -999.990 1.045 ..P WKT 2010 10 23 05 59 55 31.3200 -97.3300 251.000 122.0 100.076 6.030 -999.990 -999.990 1.001 ..P WKT 2010 10 23 06 04 55 31.3200 -97.3300 251.000 457.0 96.497 5.580 -999.990 -999.990 0.965 ..P WKT 2010 10 23 06 14 55 31.3200 -97.3300 251.000 30.0 105.348 5.140 -999.990 -999.990 1.053 ..P WKT 2010 10 23 06 19 55 31.3200 -97.3300 251.000 122.0 108.452 5.450 -999.990 -999.990 1.085 ..P WKT 2010 10 23 06 24 55 31.3200 -97.3300 251.000 457.0 101.402 6.480 -999.990 -999.990 1.014 ..P WKT 2010 10 23 06 29 55 31.3200 -97.3300 251.000 30.0 104.232 5.600 -999.990 -999.990 1.042 ..P WKT 2010 10 23 06 34 55 31.3200 -97.3300 251.000 122.0 106.924 5.920 -999.990 -999.990 1.069 ..P WKT 2010 10 23 06 39 55 31.3200 -97.3300 251.000 457.0 98.088 5.430 -999.990 -999.990 0.981 ..P WKT 2010 10 23 06 49 55 31.3200 -97.3300 251.000 30.0 105.436 5.110 -999.990 -999.990 1.054 ..P WKT 2010 10 23 06 54 55 31.3200 -97.3300 251.000 122.0 109.542 5.700 -999.990 -999.990 1.095 ..P WKT 2010 10 23 06 59 55 31.3200 -97.3300 251.000 457.0 102.526 5.680 -999.990 -999.990 1.025 ..P WKT 2010 10 23 07 04 55 31.3200 -97.3300 251.000 30.0 110.890 5.490 -999.990 -999.990 1.109 ..P WKT 2010 10 23 07 09 55 31.3200 -97.3300 251.000 122.0 113.350 6.350 -999.990 -999.990 1.133 ..P WKT 2010 10 23 07 14 55 31.3200 -97.3300 251.000 457.0 109.492 5.500 -999.990 -999.990 1.095 ..P WKT 2010 10 23 07 24 55 31.3200 -97.3300 251.000 30.0 113.177 6.000 -999.990 -999.990 1.132 ..P WKT 2010 10 23 07 29 55 31.3200 -97.3300 251.000 122.0 115.500 5.890 -999.990 -999.990 1.155 ..P WKT 2010 10 23 07 34 55 31.3200 -97.3300 251.000 457.0 100.650 5.310 -999.990 -999.990 1.007 ..P WKT 2010 10 23 07 39 55 31.3200 -97.3300 251.000 30.0 114.653 5.460 -999.990 -999.990 1.147 ..P WKT 2010 10 23 07 44 55 31.3200 -97.3300 251.000 122.0 113.267 5.270 -999.990 -999.990 1.133 ..P WKT 2010 10 23 07 49 55 31.3200 -97.3300 251.000 457.0 104.321 5.020 -999.990 -999.990 1.043 ..P WKT 2010 10 23 07 59 55 31.3200 -97.3300 251.000 30.0 104.315 4.970 -999.990 -999.990 1.043 ..P WKT 2010 10 23 08 04 55 31.3200 -97.3300 251.000 122.0 111.746 6.270 -999.990 -999.990 1.117 ..P WKT 2010 10 23 08 09 55 31.3200 -97.3300 251.000 457.0 105.703 5.320 -999.990 -999.990 1.057 ..P WKT 2010 10 23 08 14 55 31.3200 -97.3300 251.000 30.0 103.510 5.350 -999.990 -999.990 1.035 ..P WKT 2010 10 23 08 19 55 31.3200 -97.3300 251.000 122.0 111.218 5.180 -999.990 -999.990 1.112 ..P WKT 2010 10 23 08 24 55 31.3200 -97.3300 251.000 457.0 105.449 5.110 -999.990 -999.990 1.054 ..P WKT 2010 10 23 08 34 55 31.3200 -97.3300 251.000 30.0 108.411 5.300 -999.990 -999.990 1.084 ..P WKT 2010 10 23 08 39 55 31.3200 -97.3300 251.000 122.0 104.488 5.340 -999.990 -999.990 1.045 ..P WKT 2010 10 23 08 44 55 31.3200 -97.3300 251.000 457.0 100.013 5.120 -999.990 -999.990 1.000 ..P WKT 2010 10 23 08 49 55 31.3200 -97.3300 251.000 30.0 101.592 5.480 -999.990 -999.990 1.016 ..P WKT 2010 10 23 08 54 55 31.3200 -97.3300 251.000 122.0 111.703 4.980 -999.990 -999.990 1.117 ..P WKT 2010 10 23 08 59 55 31.3200 -97.3300 251.000 457.0 103.650 5.000 -999.990 -999.990 1.036 ..P WKT 2010 10 23 09 09 55 31.3200 -97.3300 251.000 30.0 106.731 5.280 -999.990 -999.990 1.067 ..P WKT 2010 10 23 09 14 55 31.3200 -97.3300 251.000 122.0 106.581 5.570 -999.990 -999.990 1.066 ..P WKT 2010 10 23 09 19 55 31.3200 -97.3300 251.000 457.0 98.170 5.580 -999.990 -999.990 0.982 ..P WKT 2010 10 23 09 24 55 31.3200 -97.3300 251.000 30.0 105.730 5.530 -999.990 -999.990 1.057 ..P WKT 2010 10 23 09 29 55 31.3200 -97.3300 251.000 122.0 114.667 5.710 -999.990 -999.990 1.147 ..P WKT 2010 10 23 09 34 55 31.3200 -97.3300 251.000 457.0 105.980 5.550 -999.990 -999.990 1.060 ..P WKT 2010 10 23 09 44 55 31.3200 -97.3300 251.000 30.0 118.567 5.360 -999.990 -999.990 1.186 ..P WKT 2010 10 23 09 49 55 31.3200 -97.3300 251.000 122.0 114.089 5.420 -999.990 -999.990 1.141 ..P WKT 2010 10 23 09 54 55 31.3200 -97.3300 251.000 457.0 107.818 6.110 -999.990 -999.990 1.078 ..P WKT 2010 10 23 09 59 55 31.3200 -97.3300 251.000 30.0 110.365 5.420 -999.990 -999.990 1.104 ..P WKT 2010 10 23 10 04 55 31.3200 -97.3300 251.000 122.0 116.494 5.520 -999.990 -999.990 1.165 ..P WKT 2010 10 23 10 09 55 31.3200 -97.3300 251.000 457.0 106.088 5.660 -999.990 -999.990 1.061 ..P WKT 2010 10 23 10 19 55 31.3200 -97.3300 251.000 30.0 117.837 5.460 -999.990 -999.990 1.178 ..P WKT 2010 10 23 10 24 55 31.3200 -97.3300 251.000 122.0 121.665 5.670 -999.990 -999.990 1.217 ..P WKT 2010 10 23 10 29 55 31.3200 -97.3300 251.000 457.0 107.435 5.450 -999.990 -999.990 1.074 ..P WKT 2010 10 23 10 34 55 31.3200 -97.3300 251.000 30.0 118.846 5.720 -999.990 -999.990 1.188 ..P WKT 2010 10 23 10 39 55 31.3200 -97.3300 251.000 122.0 114.954 5.490 -999.990 -999.990 1.150 ..P WKT 2010 10 23 10 44 55 31.3200 -97.3300 251.000 457.0 106.236 5.750 -999.990 -999.990 1.062 ..P WKT 2010 10 23 10 54 55 31.3200 -97.3300 251.000 30.0 115.884 5.550 -999.990 -999.990 1.159 ..P WKT 2010 10 23 10 59 55 31.3200 -97.3300 251.000 122.0 118.808 5.430 -999.990 -999.990 1.188 ..P WKT 2010 10 23 11 04 55 31.3200 -97.3300 251.000 457.0 110.421 5.310 -999.990 -999.990 1.104 ..P WKT 2010 10 23 11 09 55 31.3200 -97.3300 251.000 30.0 110.863 5.530 -999.990 -999.990 1.109 ..P WKT 2010 10 23 11 14 55 31.3200 -97.3300 251.000 122.0 116.685 5.560 -999.990 -999.990 1.167 ..P WKT 2010 10 23 11 19 55 31.3200 -97.3300 251.000 457.0 111.607 5.740 -999.990 -999.990 1.116 ..P WKT 2010 10 23 11 29 55 31.3200 -97.3300 251.000 30.0 111.107 5.720 -999.990 -999.990 1.111 ..P WKT 2010 10 23 11 34 55 31.3200 -97.3300 251.000 122.0 118.447 5.380 -999.990 -999.990 1.184 ..P WKT 2010 10 23 11 39 55 31.3200 -97.3300 251.000 457.0 110.190 5.440 -999.990 -999.990 1.102 ..P WKT 2010 10 23 11 44 55 31.3200 -97.3300 251.000 30.0 118.636 5.870 -999.990 -999.990 1.186 ..P WKT 2010 10 23 11 49 55 31.3200 -97.3300 251.000 122.0 117.971 5.690 -999.990 -999.990 1.180 ..P WKT 2010 10 23 12 09 55 31.3200 -97.3300 251.000 457.0 107.550 5.300 -999.990 -999.990 1.075 ..P WKT 2010 10 23 12 10 25 31.3200 -97.3300 251.000 457.0 105.659 5.630 -999.990 -999.990 1.057 ..P WKT 2010 10 23 12 10 55 31.3200 -97.3300 251.000 457.0 107.359 6.000 -999.990 -999.990 1.074 ..P WKT 2010 10 23 12 11 25 31.3200 -97.3300 251.000 457.0 109.611 5.220 -999.990 -999.990 1.096 ..P WKT 2010 10 23 12 11 55 31.3200 -97.3300 251.000 457.0 106.615 5.350 -999.990 -999.990 1.066 ..P WKT 2010 10 23 12 12 25 31.3200 -97.3300 251.000 457.0 108.039 5.300 -999.990 -999.990 1.080 ..P WKT 2010 10 23 12 12 55 31.3200 -97.3300 251.000 457.0 105.319 5.390 -999.990 -999.990 1.053 ..P WKT 2010 10 23 12 13 25 31.3200 -97.3300 251.000 457.0 104.810 6.200 -999.990 -999.990 1.048 ..P WKT 2010 10 23 12 13 55 31.3200 -97.3300 251.000 457.0 105.957 5.540 -999.990 -999.990 1.060 ..P WKT 2010 10 23 12 14 25 31.3200 -97.3300 251.000 457.0 106.552 5.370 -999.990 -999.990 1.066 ..P WKT 2010 10 23 12 14 55 31.3200 -97.3300 251.000 457.0 106.318 5.340 -999.990 -999.990 1.063 ..P WKT 2010 10 23 12 19 55 31.3200 -97.3300 251.000 30.0 111.713 6.400 -999.990 -999.990 1.117 ..P WKT 2010 10 23 12 24 55 31.3200 -97.3300 251.000 122.0 114.899 5.820 -999.990 -999.990 1.149 ..P WKT 2010 10 23 12 29 55 31.3200 -97.3300 251.000 457.0 108.146 5.770 -999.990 -999.990 1.081 ..P WKT 2010 10 23 12 34 55 31.3200 -97.3300 251.000 30.0 118.233 5.620 -999.990 -999.990 1.182 ..P WKT 2010 10 23 12 39 55 31.3200 -97.3300 251.000 122.0 119.485 5.430 -999.990 -999.990 1.195 ..P WKT 2010 10 23 12 44 55 31.3200 -97.3300 251.000 457.0 108.316 6.380 -999.990 -999.990 1.083 ..P WKT 2010 10 23 12 54 55 31.3200 -97.3300 251.000 30.0 118.948 6.060 -999.990 -999.990 1.189 ..P WKT 2010 10 23 12 59 55 31.3200 -97.3300 251.000 122.0 118.391 5.770 -999.990 -999.990 1.184 ..P WKT 2010 10 23 13 04 55 31.3200 -97.3300 251.000 457.0 109.555 5.840 -999.990 -999.990 1.096 ..P WKT 2010 10 23 13 09 55 31.3200 -97.3300 251.000 30.0 117.552 5.610 -999.990 -999.990 1.176 ..P WKT 2010 10 23 13 14 55 31.3200 -97.3300 251.000 122.0 117.824 5.410 -999.990 -999.990 1.178 ..P WKT 2010 10 23 13 19 55 31.3200 -97.3300 251.000 457.0 106.231 5.630 -999.990 -999.990 1.062 ..P WKT 2010 10 23 13 29 55 31.3200 -97.3300 251.000 30.0 117.040 5.270 -999.990 -999.990 1.170 ..P WKT 2010 10 23 13 34 55 31.3200 -97.3300 251.000 122.0 116.266 5.940 -999.990 -999.990 1.163 ..P WKT 2010 10 23 13 39 55 31.3200 -97.3300 251.000 457.0 108.046 6.180 -999.990 -999.990 1.080 ..P WKT 2010 10 23 13 44 55 31.3200 -97.3300 251.000 30.0 117.753 5.500 -999.990 -999.990 1.178 ..P WKT 2010 10 23 13 49 55 31.3200 -97.3300 251.000 122.0 114.084 5.860 -999.990 -999.990 1.141 ..P WKT 2010 10 23 13 54 55 31.3200 -97.3300 251.000 457.0 107.244 5.800 -999.990 -999.990 1.072 ..P WKT 2010 10 23 14 04 55 31.3200 -97.3300 251.000 30.0 115.527 5.790 -999.990 -999.990 1.155 ..P WKT 2010 10 23 14 09 55 31.3200 -97.3300 251.000 122.0 113.139 5.670 -999.990 -999.990 1.131 ..P WKT 2010 10 23 14 14 55 31.3200 -97.3300 251.000 457.0 101.377 5.720 -999.990 -999.990 1.014 ..P WKT 2010 10 23 14 19 55 31.3200 -97.3300 251.000 30.0 113.050 6.720 -999.990 -999.990 1.131 ..P WKT 2010 10 23 14 24 55 31.3200 -97.3300 251.000 122.0 120.587 5.360 -999.990 -999.990 1.206 ..P WKT 2010 10 23 14 29 55 31.3200 -97.3300 251.000 457.0 102.349 6.040 -999.990 -999.990 1.023 ..P WKT 2010 10 23 14 39 55 31.3200 -97.3300 251.000 30.0 127.658 5.290 -999.990 -999.990 1.277 ..P WKT 2010 10 23 14 44 55 31.3200 -97.3300 251.000 122.0 128.204 5.490 -999.990 -999.990 1.282 ..P WKT 2010 10 23 14 49 55 31.3200 -97.3300 251.000 457.0 106.013 5.280 -999.990 -999.990 1.060 ..P WKT 2010 10 23 14 54 55 31.3200 -97.3300 251.000 30.0 132.050 5.780 -999.990 -999.990 1.321 ..P WKT 2010 10 23 14 59 55 31.3200 -97.3300 251.000 122.0 129.151 5.580 -999.990 -999.990 1.292 ..P WKT 2010 10 23 15 04 55 31.3200 -97.3300 251.000 457.0 97.320 5.760 -999.990 -999.990 0.973 ..P WKT 2010 10 23 15 14 55 31.3200 -97.3300 251.000 30.0 128.937 5.790 -999.990 -999.990 1.289 ..P WKT 2010 10 23 15 19 55 31.3200 -97.3300 251.000 122.0 127.219 5.680 -999.990 -999.990 1.272 ..P WKT 2010 10 23 15 24 55 31.3200 -97.3300 251.000 457.0 112.279 5.490 -999.990 -999.990 1.123 ..P WKT 2010 10 23 15 29 55 31.3200 -97.3300 251.000 30.0 133.012 5.800 -999.990 -999.990 1.330 ..P WKT 2010 10 23 15 34 55 31.3200 -97.3300 251.000 122.0 134.186 5.610 -999.990 -999.990 1.342 ..P WKT 2010 10 23 15 39 55 31.3200 -97.3300 251.000 457.0 122.691 5.220 -999.990 -999.990 1.227 ..P WKT 2010 10 23 15 49 55 31.3200 -97.3300 251.000 30.0 124.195 5.290 -999.990 -999.990 1.242 ..P WKT 2010 10 23 15 54 55 31.3200 -97.3300 251.000 122.0 128.517 5.260 -999.990 -999.990 1.285 ..P WKT 2010 10 23 15 59 55 31.3200 -97.3300 251.000 457.0 122.650 6.490 -999.990 -999.990 1.227 ..P WKT 2010 10 23 16 04 55 31.3200 -97.3300 251.000 30.0 127.247 6.450 -999.990 -999.990 1.272 ..P WKT 2010 10 23 16 09 55 31.3200 -97.3300 251.000 122.0 121.381 6.150 -999.990 -999.990 1.214 ..P WKT 2010 10 23 16 14 55 31.3200 -97.3300 251.000 457.0 119.921 5.470 -999.990 -999.990 1.199 ..P WKT 2010 10 23 16 24 55 31.3200 -97.3300 251.000 30.0 116.882 5.310 -999.990 -999.990 1.169 ..P WKT 2010 10 23 16 29 55 31.3200 -97.3300 251.000 122.0 122.736 5.510 -999.990 -999.990 1.227 ..P WKT 2010 10 23 16 34 55 31.3200 -97.3300 251.000 457.0 117.855 5.450 -999.990 -999.990 1.179 ..P WKT 2010 10 23 16 39 55 31.3200 -97.3300 251.000 30.0 118.204 6.000 -999.990 -999.990 1.182 ..P WKT 2010 10 23 16 44 55 31.3200 -97.3300 251.000 122.0 124.881 5.610 -999.990 -999.990 1.249 ..P WKT 2010 10 23 16 49 55 31.3200 -97.3300 251.000 457.0 118.076 5.220 -999.990 -999.990 1.181 ..P WKT 2010 10 23 17 04 55 31.3200 -97.3300 251.000 30.0 111.295 5.730 -999.990 -999.990 1.113 ..P WKT 2010 10 23 17 09 55 31.3200 -97.3300 251.000 122.0 115.434 5.940 -999.990 -999.990 1.154 ..P WKT 2010 10 23 17 14 55 31.3200 -97.3300 251.000 457.0 111.045 6.000 -999.990 -999.990 1.110 ..P WKT 2010 10 23 17 19 55 31.3200 -97.3300 251.000 30.0 116.009 5.570 -999.990 -999.990 1.160 ..P WKT 2010 10 23 17 24 55 31.3200 -97.3300 251.000 122.0 119.322 6.800 -999.990 -999.990 1.193 ..P WKT 2010 10 23 17 29 55 31.3200 -97.3300 251.000 457.0 113.008 5.900 -999.990 -999.990 1.130 ..P WKT 2010 10 23 17 39 55 31.3200 -97.3300 251.000 30.0 114.154 6.400 -999.990 -999.990 1.142 ..P WKT 2010 10 23 17 44 55 31.3200 -97.3300 251.000 122.0 125.051 5.750 -999.990 -999.990 1.251 ..P WKT 2010 10 23 17 49 55 31.3200 -97.3300 251.000 457.0 117.936 5.420 -999.990 -999.990 1.179 ..P WKT 2010 10 23 17 54 55 31.3200 -97.3300 251.000 30.0 125.530 6.040 -999.990 -999.990 1.255 ..P WKT 2010 10 23 17 59 55 31.3200 -97.3300 251.000 122.0 124.327 5.540 -999.990 -999.990 1.243 ..P WKT 2010 10 23 18 04 55 31.3200 -97.3300 251.000 457.0 111.303 5.880 -999.990 -999.990 1.113 ..P WKT 2010 10 23 18 14 55 31.3200 -97.3300 251.000 30.0 113.374 5.450 -999.990 -999.990 1.134 ..P WKT 2010 10 23 18 19 55 31.3200 -97.3300 251.000 122.0 121.046 5.610 -999.990 -999.990 1.210 ..P WKT 2010 10 23 18 24 55 31.3200 -97.3300 251.000 457.0 114.562 5.820 -999.990 -999.990 1.146 ..P WKT 2010 10 23 18 29 55 31.3200 -97.3300 251.000 30.0 120.858 5.480 -999.990 -999.990 1.209 ..P WKT 2010 10 23 18 34 55 31.3200 -97.3300 251.000 122.0 127.291 5.580 -999.990 -999.990 1.273 ..P WKT 2010 10 23 18 39 55 31.3200 -97.3300 251.000 457.0 122.595 5.480 -999.990 -999.990 1.226 ..P WKT 2010 10 23 18 49 55 31.3200 -97.3300 251.000 30.0 118.953 6.930 -999.990 -999.990 1.190 ..P WKT 2010 10 23 18 54 55 31.3200 -97.3300 251.000 122.0 119.733 5.260 -999.990 -999.990 1.197 ..P WKT 2010 10 23 18 59 55 31.3200 -97.3300 251.000 457.0 113.645 5.230 -999.990 -999.990 1.136 ..P WKT 2010 10 23 19 04 55 31.3200 -97.3300 251.000 30.0 111.540 5.480 -999.990 -999.990 1.115 ..P WKT 2010 10 23 19 09 55 31.3200 -97.3300 251.000 122.0 119.462 5.950 -999.990 -999.990 1.195 ..P WKT 2010 10 23 19 14 55 31.3200 -97.3300 251.000 457.0 107.195 5.220 -999.990 -999.990 1.072 ..P WKT 2010 10 23 19 24 55 31.3200 -97.3300 251.000 30.0 107.383 5.270 -999.990 -999.990 1.074 ..P WKT 2010 10 23 19 29 55 31.3200 -97.3300 251.000 122.0 119.147 5.550 -999.990 -999.990 1.191 ..P WKT 2010 10 23 19 34 55 31.3200 -97.3300 251.000 457.0 112.650 5.500 -999.990 -999.990 1.127 ..P WKT 2010 10 23 19 39 55 31.3200 -97.3300 251.000 30.0 116.038 5.790 -999.990 -999.990 1.160 ..P WKT 2010 10 23 19 44 55 31.3200 -97.3300 251.000 122.0 114.758 6.160 -999.990 -999.990 1.148 ..P WKT 2010 10 23 19 49 55 31.3200 -97.3300 251.000 457.0 115.675 6.130 -999.990 -999.990 1.157 ..P WKT 2010 10 23 19 59 55 31.3200 -97.3300 251.000 30.0 109.292 5.830 -999.990 -999.990 1.093 ..P WKT 2010 10 23 20 04 55 31.3200 -97.3300 251.000 122.0 114.621 5.980 -999.990 -999.990 1.146 ..P WKT 2010 10 23 20 09 55 31.3200 -97.3300 251.000 457.0 112.263 5.770 -999.990 -999.990 1.123 ..P WKT 2010 10 23 20 14 55 31.3200 -97.3300 251.000 30.0 116.493 5.580 -999.990 -999.990 1.165 ..P WKT 2010 10 23 20 19 55 31.3200 -97.3300 251.000 122.0 114.135 6.690 -999.990 -999.990 1.141 ..P WKT 2010 10 23 20 24 55 31.3200 -97.3300 251.000 457.0 118.639 5.250 -999.990 -999.990 1.186 ..P WKT 2010 10 23 20 34 55 31.3200 -97.3300 251.000 30.0 116.865 5.140 -999.990 -999.990 1.169 ..P WKT 2010 10 23 20 39 55 31.3200 -97.3300 251.000 122.0 120.192 6.170 -999.990 -999.990 1.202 ..P WKT 2010 10 23 20 44 55 31.3200 -97.3300 251.000 457.0 110.897 5.240 -999.990 -999.990 1.109 ..P WKT 2010 10 23 20 49 55 31.3200 -97.3300 251.000 30.0 123.826 5.680 -999.990 -999.990 1.238 ..P WKT 2010 10 23 20 54 55 31.3200 -97.3300 251.000 122.0 129.072 5.320 -999.990 -999.990 1.291 ..P WKT 2010 10 23 20 59 55 31.3200 -97.3300 251.000 457.0 114.293 4.890 -999.990 -999.990 1.143 ..P WKT 2010 10 23 21 09 55 31.3200 -97.3300 251.000 30.0 122.903 5.300 -999.990 -999.990 1.229 ..P WKT 2010 10 23 21 14 55 31.3200 -97.3300 251.000 122.0 115.022 5.390 -999.990 -999.990 1.150 ..P WKT 2010 10 23 21 19 55 31.3200 -97.3300 251.000 457.0 113.724 6.720 -999.990 -999.990 1.137 ..P WKT 2010 10 23 21 24 55 31.3200 -97.3300 251.000 30.0 115.717 7.580 -999.990 -999.990 1.157 ..P WKT 2010 10 23 21 29 55 31.3200 -97.3300 251.000 122.0 118.808 7.080 -999.990 -999.990 1.188 ..P WKT 2010 10 23 21 34 55 31.3200 -97.3300 251.000 457.0 115.316 5.580 -999.990 -999.990 1.153 ..P WKT 2010 10 23 21 44 55 31.3200 -97.3300 251.000 30.0 114.425 5.800 -999.990 -999.990 1.144 ..P WKT 2010 10 23 21 49 55 31.3200 -97.3300 251.000 122.0 118.669 8.100 -999.990 -999.990 1.187 ..P WKT 2010 10 23 21 54 55 31.3200 -97.3300 251.000 457.0 110.441 7.960 -999.990 -999.990 1.104 ..P WKT 2010 10 23 21 59 55 31.3200 -97.3300 251.000 30.0 96.732 7.910 -999.990 -999.990 0.967 ..P WKT 2010 10 23 22 04 55 31.3200 -97.3300 251.000 122.0 103.443 6.970 -999.990 -999.990 1.034 ..P WKT 2010 10 23 22 09 55 31.3200 -97.3300 251.000 457.0 114.264 6.190 -999.990 -999.990 1.143 ..P WKT 2010 10 23 22 19 55 31.3200 -97.3300 251.000 30.0 92.587 5.730 -999.990 -999.990 0.926 ..P WKT 2010 10 23 22 24 55 31.3200 -97.3300 251.000 122.0 98.181 6.720 -999.990 -999.990 0.982 ..P WKT 2010 10 23 22 29 55 31.3200 -97.3300 251.000 457.0 109.117 7.740 -999.990 -999.990 1.091 ..P WKT 2010 10 23 22 34 55 31.3200 -97.3300 251.000 30.0 92.380 6.370 -999.990 -999.990 0.924 ..P WKT 2010 10 23 22 39 55 31.3200 -97.3300 251.000 122.0 96.056 5.430 -999.990 -999.990 0.961 ..P WKT 2010 10 23 22 44 55 31.3200 -97.3300 251.000 457.0 107.812 5.850 -999.990 -999.990 1.078 ..P WKT 2010 10 23 22 54 55 31.3200 -97.3300 251.000 30.0 93.462 5.000 -999.990 -999.990 0.935 ..P WKT 2010 10 23 22 59 55 31.3200 -97.3300 251.000 122.0 91.052 5.730 -999.990 -999.990 0.911 ..P WKT 2010 10 23 23 04 55 31.3200 -97.3300 251.000 457.0 106.992 5.540 -999.990 -999.990 1.070 ..P WKT 2010 10 23 23 09 55 31.3200 -97.3300 251.000 30.0 84.727 6.030 -999.990 -999.990 0.847 ..P WKT 2010 10 23 23 14 55 31.3200 -97.3300 251.000 122.0 93.408 5.350 -999.990 -999.990 0.934 ..P WKT 2010 10 23 23 19 55 31.3200 -97.3300 251.000 457.0 112.357 5.190 -999.990 -999.990 1.124 ..P WKT 2010 10 23 23 29 55 31.3200 -97.3300 251.000 30.0 96.099 4.780 -999.990 -999.990 0.961 ..P WKT 2010 10 23 23 34 55 31.3200 -97.3300 251.000 122.0 103.880 4.970 -999.990 -999.990 1.039 ..P WKT 2010 10 23 23 39 55 31.3200 -97.3300 251.000 457.0 122.885 4.950 -999.990 -999.990 1.229 ..P WKT 2010 10 23 23 44 55 31.3200 -97.3300 251.000 30.0 107.944 5.490 -999.990 -999.990 1.079 ..P WKT 2010 10 23 23 49 55 31.3200 -97.3300 251.000 122.0 109.154 5.930 -999.990 -999.990 1.092 ..P WKT 2010 10 24 00 09 55 31.3200 -97.3300 251.000 457.0 119.456 4.950 -999.990 -999.990 1.195 ..P WKT 2010 10 24 00 10 25 31.3200 -97.3300 251.000 457.0 113.360 5.570 -999.990 -999.990 1.134 ..P WKT 2010 10 24 00 10 55 31.3200 -97.3300 251.000 457.0 112.464 5.060 -999.990 -999.990 1.125 ..P WKT 2010 10 24 00 11 25 31.3200 -97.3300 251.000 457.0 116.769 5.130 -999.990 -999.990 1.168 ..P WKT 2010 10 24 00 11 55 31.3200 -97.3300 251.000 457.0 111.494 5.280 -999.990 -999.990 1.115 ..P WKT 2010 10 24 00 12 25 31.3200 -97.3300 251.000 457.0 109.229 4.930 -999.990 -999.990 1.092 ..P WKT 2010 10 24 00 12 55 31.3200 -97.3300 251.000 457.0 115.178 5.510 -999.990 -999.990 1.152 ..P WKT 2010 10 24 00 13 25 31.3200 -97.3300 251.000 457.0 111.270 5.420 -999.990 -999.990 1.113 ..P WKT 2010 10 24 00 13 55 31.3200 -97.3300 251.000 457.0 111.196 5.050 -999.990 -999.990 1.112 ..P WKT 2010 10 24 00 14 25 31.3200 -97.3300 251.000 457.0 107.836 4.980 -999.990 -999.990 1.078 ..P WKT 2010 10 24 00 14 55 31.3200 -97.3300 251.000 457.0 111.868 5.100 -999.990 -999.990 1.119 ..P WKT 2010 10 24 00 19 55 31.3200 -97.3300 251.000 30.0 114.956 5.180 -999.990 -999.990 1.150 ..P WKT 2010 10 24 00 24 55 31.3200 -97.3300 251.000 122.0 108.461 5.360 -999.990 -999.990 1.085 ..P WKT 2010 10 24 00 29 55 31.3200 -97.3300 251.000 457.0 111.275 5.450 -999.990 -999.990 1.113 ..P WKT 2010 10 24 00 34 55 31.3200 -97.3300 251.000 30.0 107.790 5.150 -999.990 -999.990 1.078 ..P WKT 2010 10 24 00 39 55 31.3200 -97.3300 251.000 122.0 116.632 5.180 -999.990 -999.990 1.166 ..P WKT 2010 10 24 00 44 55 31.3200 -97.3300 251.000 457.0 107.667 5.040 -999.990 -999.990 1.077 ..P WKT 2010 10 24 00 54 55 31.3200 -97.3300 251.000 30.0 96.875 5.070 -999.990 -999.990 0.969 ..P WKT 2010 10 24 00 59 55 31.3200 -97.3300 251.000 122.0 93.130 5.020 -999.990 -999.990 0.931 ..P WKT 2010 10 24 01 04 55 31.3200 -97.3300 251.000 457.0 101.992 5.660 -999.990 -999.990 1.020 ..P WKT 2010 10 24 01 09 55 31.3200 -97.3300 251.000 30.0 103.455 5.650 -999.990 -999.990 1.035 ..P WKT 2010 10 24 01 14 55 31.3200 -97.3300 251.000 122.0 98.613 5.220 -999.990 -999.990 0.986 ..P WKT 2010 10 24 01 19 55 31.3200 -97.3300 251.000 457.0 107.480 5.910 -999.990 -999.990 1.075 ..P WKT 2010 10 24 01 29 55 31.3200 -97.3300 251.000 30.0 108.743 5.260 -999.990 -999.990 1.087 ..P WKT 2010 10 24 01 34 55 31.3200 -97.3300 251.000 122.0 101.274 5.900 -999.990 -999.990 1.013 ..P WKT 2010 10 24 01 39 55 31.3200 -97.3300 251.000 457.0 116.024 5.210 -999.990 -999.990 1.160 ..P WKT 2010 10 24 01 44 55 31.3200 -97.3300 251.000 30.0 106.221 5.750 -999.990 -999.990 1.062 ..P WKT 2010 10 24 01 49 55 31.3200 -97.3300 251.000 122.0 101.218 5.540 -999.990 -999.990 1.012 ..P WKT 2010 10 24 01 54 55 31.3200 -97.3300 251.000 457.0 118.993 5.170 -999.990 -999.990 1.190 ..P WKT 2010 10 24 02 04 55 31.3200 -97.3300 251.000 30.0 105.064 5.470 -999.990 -999.990 1.051 ..P WKT 2010 10 24 02 09 55 31.3200 -97.3300 251.000 122.0 95.999 5.690 -999.990 -999.990 0.960 ..P WKT 2010 10 24 02 14 55 31.3200 -97.3300 251.000 457.0 114.939 5.800 -999.990 -999.990 1.149 ..P WKT 2010 10 24 02 19 55 31.3200 -97.3300 251.000 30.0 105.461 5.570 -999.990 -999.990 1.055 ..P WKT 2010 10 24 02 24 55 31.3200 -97.3300 251.000 122.0 96.531 5.460 -999.990 -999.990 0.965 ..P WKT 2010 10 24 02 29 55 31.3200 -97.3300 251.000 457.0 111.357 5.710 -999.990 -999.990 1.114 ..P WKT 2010 10 24 02 39 55 31.3200 -97.3300 251.000 30.0 100.654 5.590 -999.990 -999.990 1.007 ..P WKT 2010 10 24 02 44 55 31.3200 -97.3300 251.000 122.0 93.523 5.620 -999.990 -999.990 0.935 ..P WKT 2010 10 24 02 49 55 31.3200 -97.3300 251.000 457.0 115.521 6.150 -999.990 -999.990 1.155 ..P WKT 2010 10 24 02 54 55 31.3200 -97.3300 251.000 30.0 104.132 5.390 -999.990 -999.990 1.041 ..P WKT 2010 10 24 02 59 55 31.3200 -97.3300 251.000 122.0 103.871 5.210 -999.990 -999.990 1.039 ..P WKT 2010 10 24 03 04 55 31.3200 -97.3300 251.000 457.0 112.820 6.010 -999.990 -999.990 1.128 ..P WKT 2010 10 24 03 14 55 31.3200 -97.3300 251.000 30.0 97.629 5.970 -999.990 -999.990 0.976 ..P WKT 2010 10 24 03 19 55 31.3200 -97.3300 251.000 122.0 104.695 5.980 -999.990 -999.990 1.047 ..P WKT 2010 10 24 03 24 55 31.3200 -97.3300 251.000 457.0 108.599 5.800 -999.990 -999.990 1.086 ..P WKT 2010 10 24 03 29 55 31.3200 -97.3300 251.000 30.0 96.550 6.330 -999.990 -999.990 0.966 ..P WKT 2010 10 24 03 34 55 31.3200 -97.3300 251.000 122.0 104.305 5.320 -999.990 -999.990 1.043 ..P WKT 2010 10 24 03 39 55 31.3200 -97.3300 251.000 457.0 113.990 5.300 -999.990 -999.990 1.140 ..P WKT 2010 10 24 03 49 55 31.3200 -97.3300 251.000 30.0 101.086 6.040 -999.990 -999.990 1.011 ..P WKT 2010 10 24 03 54 55 31.3200 -97.3300 251.000 122.0 99.409 5.160 -999.990 -999.990 0.994 ..P WKT 2010 10 24 03 59 55 31.3200 -97.3300 251.000 457.0 112.872 5.690 -999.990 -999.990 1.129 ..P WKT 2010 10 24 04 04 55 31.3200 -97.3300 251.000 30.0 96.054 6.510 -999.990 -999.990 0.961 ..P WKT 2010 10 24 04 09 55 31.3200 -97.3300 251.000 122.0 105.941 5.890 -999.990 -999.990 1.059 ..P WKT 2010 10 24 04 14 55 31.3200 -97.3300 251.000 457.0 105.917 5.790 -999.990 -999.990 1.059 ..P WKT 2010 10 24 04 24 55 31.3200 -97.3300 251.000 30.0 103.940 5.590 -999.990 -999.990 1.039 ..P WKT 2010 10 24 04 29 55 31.3200 -97.3300 251.000 122.0 110.526 6.930 -999.990 -999.990 1.105 ..P WKT 2010 10 24 04 34 55 31.3200 -97.3300 251.000 457.0 110.227 7.030 -999.990 -999.990 1.102 ..P WKT 2010 10 24 04 39 55 31.3200 -97.3300 251.000 30.0 93.945 5.710 -999.990 -999.990 0.939 ..P WKT 2010 10 24 04 44 55 31.3200 -97.3300 251.000 122.0 111.831 5.530 -999.990 -999.990 1.118 ..P WKT 2010 10 24 04 49 55 31.3200 -97.3300 251.000 457.0 112.359 5.090 -999.990 -999.990 1.124 ..P WKT 2010 10 24 05 04 55 31.3200 -97.3300 251.000 30.0 94.169 5.540 -999.990 -999.990 0.942 ..P WKT 2010 10 24 05 09 55 31.3200 -97.3300 251.000 122.0 113.898 5.810 -999.990 -999.990 1.139 ..P WKT 2010 10 24 05 14 55 31.3200 -97.3300 251.000 457.0 112.949 5.780 -999.990 -999.990 1.129 ..P WKT 2010 10 24 05 19 55 31.3200 -97.3300 251.000 30.0 100.415 5.840 -999.990 -999.990 1.004 ..P WKT 2010 10 24 05 24 55 31.3200 -97.3300 251.000 122.0 112.980 5.230 -999.990 -999.990 1.130 ..P WKT 2010 10 24 05 29 55 31.3200 -97.3300 251.000 457.0 112.305 5.010 -999.990 -999.990 1.123 ..P WKT 2010 10 24 05 39 55 31.3200 -97.3300 251.000 30.0 100.116 6.020 -999.990 -999.990 1.001 ..P WKT 2010 10 24 05 44 55 31.3200 -97.3300 251.000 122.0 118.266 5.440 -999.990 -999.990 1.183 ..P WKT 2010 10 24 05 49 55 31.3200 -97.3300 251.000 457.0 119.032 5.580 -999.990 -999.990 1.190 ..P WKT 2010 10 24 05 54 55 31.3200 -97.3300 251.000 30.0 107.099 5.080 -999.990 -999.990 1.071 ..P WKT 2010 10 24 05 59 55 31.3200 -97.3300 251.000 122.0 115.870 6.100 -999.990 -999.990 1.159 ..P WKT 2010 10 24 06 04 55 31.3200 -97.3300 251.000 457.0 115.254 5.700 -999.990 -999.990 1.153 ..P WKT 2010 10 24 06 14 55 31.3200 -97.3300 251.000 30.0 101.398 5.790 -999.990 -999.990 1.014 ..P WKT 2010 10 24 06 19 55 31.3200 -97.3300 251.000 122.0 110.942 5.910 -999.990 -999.990 1.109 ..P WKT 2010 10 24 06 24 55 31.3200 -97.3300 251.000 457.0 103.361 6.660 -999.990 -999.990 1.034 ..P WKT 2010 10 24 06 29 55 31.3200 -97.3300 251.000 30.0 103.927 6.390 -999.990 -999.990 1.039 ..P WKT 2010 10 24 06 34 55 31.3200 -97.3300 251.000 122.0 108.501 6.700 -999.990 -999.990 1.085 ..P WKT 2010 10 24 06 39 55 31.3200 -97.3300 251.000 457.0 106.582 7.260 -999.990 -999.990 1.066 ..P WKT 2010 10 24 06 49 55 31.3200 -97.3300 251.000 30.0 104.282 7.430 -999.990 -999.990 1.043 ..P WKT 2010 10 24 06 54 55 31.3200 -97.3300 251.000 122.0 110.813 7.630 -999.990 -999.990 1.108 ..P WKT 2010 10 24 06 59 55 31.3200 -97.3300 251.000 457.0 97.577 6.840 -999.990 -999.990 0.976 ..P WKT 2010 10 24 07 04 55 31.3200 -97.3300 251.000 30.0 102.173 6.050 -999.990 -999.990 1.022 ..P WKT 2010 10 24 07 09 55 31.3200 -97.3300 251.000 122.0 102.621 6.690 -999.990 -999.990 1.026 ..P WKT 2010 10 24 07 14 55 31.3200 -97.3300 251.000 457.0 99.890 5.940 -999.990 -999.990 0.999 ..P WKT 2010 10 24 07 24 55 31.3200 -97.3300 251.000 30.0 109.660 5.400 -999.990 -999.990 1.097 ..P WKT 2010 10 24 07 29 55 31.3200 -97.3300 251.000 122.0 113.727 5.170 -999.990 -999.990 1.137 ..P WKT 2010 10 24 07 34 55 31.3200 -97.3300 251.000 457.0 107.418 5.170 -999.990 -999.990 1.074 ..P WKT 2010 10 24 07 39 55 31.3200 -97.3300 251.000 30.0 103.597 5.440 -999.990 -999.990 1.036 ..P WKT 2010 10 24 07 44 55 31.3200 -97.3300 251.000 122.0 113.892 5.750 -999.990 -999.990 1.139 ..P WKT 2010 10 24 07 49 55 31.3200 -97.3300 251.000 457.0 107.304 5.350 -999.990 -999.990 1.073 ..P WKT 2010 10 24 07 59 55 31.3200 -97.3300 251.000 30.0 109.074 5.630 -999.990 -999.990 1.091 ..P WKT 2010 10 24 08 04 55 31.3200 -97.3300 251.000 122.0 108.298 5.010 -999.990 -999.990 1.083 ..P WKT 2010 10 24 08 09 55 31.3200 -97.3300 251.000 457.0 114.447 4.940 -999.990 -999.990 1.144 ..P WKT 2010 10 24 08 14 55 31.3200 -97.3300 251.000 30.0 112.563 5.390 -999.990 -999.990 1.126 ..P WKT 2010 10 24 08 19 55 31.3200 -97.3300 251.000 122.0 118.713 5.120 -999.990 -999.990 1.187 ..P WKT 2010 10 24 08 24 55 31.3200 -97.3300 251.000 457.0 116.829 4.730 -999.990 -999.990 1.168 ..P WKT 2010 10 24 08 34 55 31.3200 -97.3300 251.000 30.0 109.379 4.880 -999.990 -999.990 1.094 ..P WKT 2010 10 24 08 39 55 31.3200 -97.3300 251.000 122.0 121.273 6.570 -999.990 -999.990 1.213 ..P WKT 2010 10 24 08 44 55 31.3200 -97.3300 251.000 457.0 112.380 5.370 -999.990 -999.990 1.124 ..P WKT 2010 10 24 08 49 55 31.3200 -97.3300 251.000 30.0 112.910 5.330 -999.990 -999.990 1.129 ..P WKT 2010 10 24 08 54 55 31.3200 -97.3300 251.000 122.0 122.036 4.840 -999.990 -999.990 1.220 ..P WKT 2010 10 24 08 59 55 31.3200 -97.3300 251.000 457.0 114.527 4.770 -999.990 -999.990 1.145 ..P WKT 2010 10 24 09 09 55 31.3200 -97.3300 251.000 30.0 118.758 5.150 -999.990 -999.990 1.188 ..P WKT 2010 10 24 09 14 55 31.3200 -97.3300 251.000 122.0 117.189 4.930 -999.990 -999.990 1.172 ..P WKT 2010 10 24 09 19 55 31.3200 -97.3300 251.000 457.0 105.910 4.780 -999.990 -999.990 1.059 ..P WKT 2010 10 24 09 24 55 31.3200 -97.3300 251.000 30.0 109.056 5.190 -999.990 -999.990 1.091 ..P WKT 2010 10 24 09 29 55 31.3200 -97.3300 251.000 122.0 115.394 4.900 -999.990 -999.990 1.154 ..P WKT 2010 10 24 09 34 55 31.3200 -97.3300 251.000 457.0 105.914 6.140 -999.990 -999.990 1.059 ..P WKT 2010 10 24 09 44 55 31.3200 -97.3300 251.000 30.0 122.660 5.150 -999.990 -999.990 1.227 ..P WKT 2010 10 24 09 49 55 31.3200 -97.3300 251.000 122.0 120.436 5.670 -999.990 -999.990 1.204 ..P WKT 2010 10 24 09 54 55 31.3200 -97.3300 251.000 457.0 115.018 6.330 -999.990 -999.990 1.150 ..P WKT 2010 10 24 09 59 55 31.3200 -97.3300 251.000 30.0 116.819 6.350 -999.990 -999.990 1.168 ..P WKT 2010 10 24 10 04 55 31.3200 -97.3300 251.000 122.0 125.704 5.860 -999.990 -999.990 1.257 ..P WKT 2010 10 24 10 09 55 31.3200 -97.3300 251.000 457.0 117.785 5.140 -999.990 -999.990 1.178 ..P WKT 2010 10 24 10 19 55 31.3200 -97.3300 251.000 30.0 117.857 5.400 -999.990 -999.990 1.179 ..P WKT 2010 10 24 10 24 55 31.3200 -97.3300 251.000 122.0 115.849 6.370 -999.990 -999.990 1.158 ..P WKT 2010 10 24 10 29 55 31.3200 -97.3300 251.000 457.0 112.033 6.390 -999.990 -999.990 1.120 ..P WKT 2010 10 24 10 34 55 31.3200 -97.3300 251.000 30.0 118.362 5.720 -999.990 -999.990 1.184 ..P WKT 2010 10 24 10 39 55 31.3200 -97.3300 251.000 122.0 118.994 5.560 -999.990 -999.990 1.190 ..P WKT 2010 10 24 10 44 55 31.3200 -97.3300 251.000 457.0 105.448 4.910 -999.990 -999.990 1.054 ..P WKT 2010 10 24 10 54 55 31.3200 -97.3300 251.000 30.0 117.733 5.180 -999.990 -999.990 1.177 ..P WKT 2010 10 24 10 59 55 31.3200 -97.3300 251.000 122.0 121.881 5.700 -999.990 -999.990 1.219 ..P WKT 2010 10 24 11 04 55 31.3200 -97.3300 251.000 457.0 101.831 5.840 -999.990 -999.990 1.018 ..P WKT 2010 10 24 11 09 55 31.3200 -97.3300 251.000 30.0 121.557 6.670 -999.990 -999.990 1.216 ..P WKT 2010 10 24 11 14 55 31.3200 -97.3300 251.000 122.0 116.943 5.730 -999.990 -999.990 1.169 ..P WKT 2010 10 24 11 19 55 31.3200 -97.3300 251.000 457.0 105.790 5.530 -999.990 -999.990 1.058 ..P WKT 2010 10 24 11 29 55 31.3200 -97.3300 251.000 30.0 125.645 6.000 -999.990 -999.990 1.256 ..P WKT 2010 10 24 11 34 55 31.3200 -97.3300 251.000 122.0 121.313 6.380 -999.990 -999.990 1.213 ..P WKT 2010 10 24 11 39 55 31.3200 -97.3300 251.000 457.0 110.020 5.930 -999.990 -999.990 1.100 ..P WKT 2010 10 24 11 44 55 31.3200 -97.3300 251.000 30.0 126.289 6.720 -999.990 -999.990 1.263 ..P WKT 2010 10 24 11 49 55 31.3200 -97.3300 251.000 122.0 127.803 5.330 -999.990 -999.990 1.278 ..P WKT 2010 10 24 12 09 55 31.3200 -97.3300 251.000 457.0 100.562 5.010 -999.990 -999.990 1.006 ..P WKT 2010 10 24 12 10 25 31.3200 -97.3300 251.000 457.0 103.601 5.220 -999.990 -999.990 1.036 ..P WKT 2010 10 24 12 10 55 31.3200 -97.3300 251.000 457.0 100.235 4.940 -999.990 -999.990 1.002 ..P WKT 2010 10 24 12 11 25 31.3200 -97.3300 251.000 457.0 98.262 5.000 -999.990 -999.990 0.983 ..P WKT 2010 10 24 12 11 55 31.3200 -97.3300 251.000 457.0 98.794 5.320 -999.990 -999.990 0.988 ..P WKT 2010 10 24 12 12 25 31.3200 -97.3300 251.000 457.0 100.720 4.910 -999.990 -999.990 1.007 ..P WKT 2010 10 24 12 12 55 31.3200 -97.3300 251.000 457.0 100.973 5.480 -999.990 -999.990 1.010 ..P WKT 2010 10 24 12 13 25 31.3200 -97.3300 251.000 457.0 98.443 5.300 -999.990 -999.990 0.984 ..P WKT 2010 10 24 12 13 55 31.3200 -97.3300 251.000 457.0 101.760 5.030 -999.990 -999.990 1.018 ..P WKT 2010 10 24 12 14 25 31.3200 -97.3300 251.000 457.0 96.446 5.130 -999.990 -999.990 0.964 ..P WKT 2010 10 24 12 14 55 31.3200 -97.3300 251.000 457.0 96.978 5.350 -999.990 -999.990 0.970 ..P WKT 2010 10 24 12 19 55 31.3200 -97.3300 251.000 30.0 110.376 5.100 -999.990 -999.990 1.104 ..P WKT 2010 10 24 12 24 55 31.3200 -97.3300 251.000 122.0 117.924 5.270 -999.990 -999.990 1.179 ..P WKT 2010 10 24 12 29 55 31.3200 -97.3300 251.000 457.0 103.207 5.810 -999.990 -999.990 1.032 ..P WKT 2010 10 24 12 34 55 31.3200 -97.3300 251.000 30.0 115.485 5.590 -999.990 -999.990 1.155 ..P WKT 2010 10 24 12 39 55 31.3200 -97.3300 251.000 122.0 116.074 6.340 -999.990 -999.990 1.161 ..P WKT 2010 10 24 12 44 55 31.3200 -97.3300 251.000 457.0 101.920 5.270 -999.990 -999.990 1.019 ..P WKT 2010 10 24 12 54 55 31.3200 -97.3300 251.000 30.0 120.003 5.030 -999.990 -999.990 1.200 ..P WKT 2010 10 24 12 59 55 31.3200 -97.3300 251.000 122.0 113.857 6.040 -999.990 -999.990 1.139 ..P WKT 2010 10 24 13 04 55 31.3200 -97.3300 251.000 457.0 106.322 5.620 -999.990 -999.990 1.063 ..P WKT 2010 10 24 13 09 55 31.3200 -97.3300 251.000 30.0 120.193 5.250 -999.990 -999.990 1.202 ..P WKT 2010 10 24 13 14 55 31.3200 -97.3300 251.000 122.0 116.550 5.720 -999.990 -999.990 1.165 ..P WKT 2010 10 24 13 19 55 31.3200 -97.3300 251.000 457.0 103.739 5.370 -999.990 -999.990 1.037 ..P WKT 2010 10 24 13 29 55 31.3200 -97.3300 251.000 30.0 118.943 6.070 -999.990 -999.990 1.189 ..P WKT 2010 10 24 13 34 55 31.3200 -97.3300 251.000 122.0 122.644 5.610 -999.990 -999.990 1.226 ..P WKT 2010 10 24 13 39 55 31.3200 -97.3300 251.000 457.0 106.209 5.410 -999.990 -999.990 1.062 ..P WKT 2010 10 24 13 44 55 31.3200 -97.3300 251.000 30.0 120.045 5.800 -999.990 -999.990 1.200 ..P WKT 2010 10 24 13 49 55 31.3200 -97.3300 251.000 122.0 124.022 5.450 -999.990 -999.990 1.240 ..P WKT 2010 10 24 13 54 55 31.3200 -97.3300 251.000 457.0 120.085 6.210 -999.990 -999.990 1.201 ..P WKT 2010 10 24 14 04 55 31.3200 -97.3300 251.000 30.0 118.857 5.330 -999.990 -999.990 1.189 ..P WKT 2010 10 24 14 09 55 31.3200 -97.3300 251.000 122.0 121.285 5.600 -999.990 -999.990 1.213 ..P WKT 2010 10 24 14 14 55 31.3200 -97.3300 251.000 457.0 116.776 5.470 -999.990 -999.990 1.168 ..P WKT 2010 10 24 14 19 55 31.3200 -97.3300 251.000 30.0 115.598 6.470 -999.990 -999.990 1.156 ..P WKT 2010 10 24 14 24 55 31.3200 -97.3300 251.000 122.0 114.559 5.700 -999.990 -999.990 1.146 ..P WKT 2010 10 24 14 29 55 31.3200 -97.3300 251.000 457.0 117.679 5.930 -999.990 -999.990 1.177 ..P WKT 2010 10 24 14 39 55 31.3200 -97.3300 251.000 30.0 118.314 5.890 -999.990 -999.990 1.183 ..P WKT 2010 10 24 14 44 55 31.3200 -97.3300 251.000 122.0 119.848 5.610 -999.990 -999.990 1.198 ..P WKT 2010 10 24 14 49 55 31.3200 -97.3300 251.000 457.0 107.249 5.580 -999.990 -999.990 1.072 ..P WKT 2010 10 24 14 54 55 31.3200 -97.3300 251.000 30.0 118.760 5.770 -999.990 -999.990 1.188 ..P WKT 2010 10 24 14 59 55 31.3200 -97.3300 251.000 122.0 121.680 5.690 -999.990 -999.990 1.217 ..P WKT 2010 10 24 15 04 55 31.3200 -97.3300 251.000 457.0 110.331 5.320 -999.990 -999.990 1.103 ..P WKT 2010 10 24 15 14 55 31.3200 -97.3300 251.000 30.0 111.818 5.330 -999.990 -999.990 1.118 ..P WKT 2010 10 24 15 19 55 31.3200 -97.3300 251.000 122.0 112.601 5.350 -999.990 -999.990 1.126 ..P WKT 2010 10 24 15 24 55 31.3200 -97.3300 251.000 457.0 105.077 5.800 -999.990 -999.990 1.051 ..P WKT 2010 10 24 15 29 55 31.3200 -97.3300 251.000 30.0 111.674 5.580 -999.990 -999.990 1.117 ..P WKT 2010 10 24 15 34 55 31.3200 -97.3300 251.000 122.0 121.037 7.290 -999.990 -999.990 1.210 ..P WKT 2010 10 24 15 39 55 31.3200 -97.3300 251.000 457.0 113.792 5.820 -999.990 -999.990 1.138 ..P WKT 2010 10 24 15 49 55 31.3200 -97.3300 251.000 30.0 119.999 5.690 -999.990 -999.990 1.200 ..P WKT 2010 10 24 15 54 55 31.3200 -97.3300 251.000 122.0 119.614 5.740 -999.990 -999.990 1.196 ..P WKT 2010 10 24 15 59 55 31.3200 -97.3300 251.000 457.0 118.400 5.660 -999.990 -999.990 1.184 ..P WKT 2010 10 24 16 04 55 31.3200 -97.3300 251.000 30.0 113.037 5.710 -999.990 -999.990 1.130 ..P WKT 2010 10 24 16 09 55 31.3200 -97.3300 251.000 122.0 115.142 5.490 -999.990 -999.990 1.151 ..P WKT 2010 10 24 16 14 55 31.3200 -97.3300 251.000 457.0 116.140 5.580 -999.990 -999.990 1.161 ..P WKT 2010 10 24 16 24 55 31.3200 -97.3300 251.000 30.0 110.041 5.300 -999.990 -999.990 1.100 ..P WKT 2010 10 24 16 29 55 31.3200 -97.3300 251.000 122.0 115.105 5.450 -999.990 -999.990 1.151 ..P WKT 2010 10 24 16 34 55 31.3200 -97.3300 251.000 457.0 111.880 5.750 -999.990 -999.990 1.119 ..P WKT 2010 10 24 16 39 55 31.3200 -97.3300 251.000 30.0 108.655 6.280 -999.990 -999.990 1.087 ..P WKT 2010 10 24 16 44 55 31.3200 -97.3300 251.000 122.0 116.203 5.710 -999.990 -999.990 1.162 ..P WKT 2010 10 24 16 49 55 31.3200 -97.3300 251.000 457.0 109.941 5.560 -999.990 -999.990 1.099 ..P WKT 2010 10 24 17 04 55 31.3200 -97.3300 251.000 30.0 106.456 5.740 -999.990 -999.990 1.065 ..P WKT 2010 10 24 17 09 55 31.3200 -97.3300 251.000 122.0 111.845 6.250 -999.990 -999.990 1.118 ..P WKT 2010 10 24 17 14 55 31.3200 -97.3300 251.000 457.0 106.470 6.030 -999.990 -999.990 1.065 ..P WKT 2010 10 24 17 19 55 31.3200 -97.3300 251.000 30.0 107.304 5.850 -999.990 -999.990 1.073 ..P WKT 2010 10 24 17 24 55 31.3200 -97.3300 251.000 122.0 108.415 5.930 -999.990 -999.990 1.084 ..P WKT 2010 10 24 17 29 55 31.3200 -97.3300 251.000 457.0 110.077 5.940 -999.990 -999.990 1.101 ..P WKT 2010 10 24 17 39 55 31.3200 -97.3300 251.000 30.0 111.179 5.860 -999.990 -999.990 1.112 ..P WKT 2010 10 24 17 44 55 31.3200 -97.3300 251.000 122.0 117.925 5.850 -999.990 -999.990 1.179 ..P WKT 2010 10 24 17 49 55 31.3200 -97.3300 251.000 457.0 116.952 5.840 -999.990 -999.990 1.170 ..P WKT 2010 10 24 17 54 55 31.3200 -97.3300 251.000 30.0 116.942 6.150 -999.990 -999.990 1.169 ..P WKT 2010 10 24 17 59 55 31.3200 -97.3300 251.000 122.0 119.000 6.280 -999.990 -999.990 1.190 ..P WKT 2010 10 24 18 04 55 31.3200 -97.3300 251.000 457.0 111.964 5.910 -999.990 -999.990 1.120 ..P WKT 2010 10 24 18 14 55 31.3200 -97.3300 251.000 30.0 115.941 5.910 -999.990 -999.990 1.159 ..P WKT 2010 10 24 18 19 55 31.3200 -97.3300 251.000 122.0 116.483 6.160 -999.990 -999.990 1.165 ..P WKT 2010 10 24 18 24 55 31.3200 -97.3300 251.000 457.0 114.270 7.970 -999.990 -999.990 1.143 ..P WKT 2010 10 24 18 29 55 31.3200 -97.3300 251.000 30.0 115.363 5.760 -999.990 -999.990 1.154 ..P WKT 2010 10 24 18 34 55 31.3200 -97.3300 251.000 122.0 120.998 5.990 -999.990 -999.990 1.210 ..P WKT 2010 10 24 18 39 55 31.3200 -97.3300 251.000 457.0 124.430 5.880 -999.990 -999.990 1.244 ..P WKT 2010 10 24 18 49 55 31.3200 -97.3300 251.000 30.0 114.836 5.680 -999.990 -999.990 1.148 ..P WKT 2010 10 24 18 54 55 31.3200 -97.3300 251.000 122.0 120.114 5.820 -999.990 -999.990 1.201 ..P WKT 2010 10 24 18 59 55 31.3200 -97.3300 251.000 457.0 117.274 5.820 -999.990 -999.990 1.173 ..P WKT 2010 10 24 19 04 55 31.3200 -97.3300 251.000 30.0 111.547 6.140 -999.990 -999.990 1.115 ..P WKT 2010 10 24 19 09 55 31.3200 -97.3300 251.000 122.0 122.600 7.150 -999.990 -999.990 1.226 ..P WKT 2010 10 24 19 14 55 31.3200 -97.3300 251.000 457.0 113.023 6.070 -999.990 -999.990 1.130 ..P WKT 2010 10 24 19 24 55 31.3200 -97.3300 251.000 30.0 117.091 6.020 -999.990 -999.990 1.171 ..P WKT 2010 10 24 19 29 55 31.3200 -97.3300 251.000 122.0 120.832 6.250 -999.990 -999.990 1.208 ..P WKT 2010 10 24 19 34 55 31.3200 -97.3300 251.000 457.0 116.326 6.080 -999.990 -999.990 1.163 ..P WKT 2010 10 24 19 39 55 31.3200 -97.3300 251.000 30.0 115.670 6.690 -999.990 -999.990 1.157 ..P WKT 2010 10 24 19 44 55 31.3200 -97.3300 251.000 122.0 119.684 6.400 -999.990 -999.990 1.197 ..P WKT 2010 10 24 19 49 55 31.3200 -97.3300 251.000 457.0 116.554 6.330 -999.990 -999.990 1.166 ..P WKT 2010 10 24 19 59 55 31.3200 -97.3300 251.000 30.0 118.929 6.180 -999.990 -999.990 1.189 ..P WKT 2010 10 24 20 04 55 31.3200 -97.3300 251.000 122.0 116.468 6.030 -999.990 -999.990 1.165 ..P WKT 2010 10 24 20 09 55 31.3200 -97.3300 251.000 457.0 116.204 5.950 -999.990 -999.990 1.162 ..P WKT 2010 10 24 20 14 55 31.3200 -97.3300 251.000 30.0 108.802 6.040 -999.990 -999.990 1.088 ..P WKT 2010 10 24 20 19 55 31.3200 -97.3300 251.000 122.0 113.754 6.380 -999.990 -999.990 1.138 ..P WKT 2010 10 24 20 24 55 31.3200 -97.3300 251.000 457.0 106.356 6.440 -999.990 -999.990 1.064 ..P WKT 2010 10 24 20 34 55 31.3200 -97.3300 251.000 30.0 108.535 5.930 -999.990 -999.990 1.085 ..P WKT 2010 10 24 20 39 55 31.3200 -97.3300 251.000 122.0 110.702 6.000 -999.990 -999.990 1.107 ..P WKT 2010 10 24 20 44 55 31.3200 -97.3300 251.000 457.0 110.674 6.070 -999.990 -999.990 1.107 ..P WKT 2010 10 24 20 49 55 31.3200 -97.3300 251.000 30.0 111.743 6.640 -999.990 -999.990 1.117 ..P WKT 2010 10 24 20 54 55 31.3200 -97.3300 251.000 122.0 110.070 6.790 -999.990 -999.990 1.101 ..P WKT 2010 10 24 20 59 55 31.3200 -97.3300 251.000 457.0 107.026 6.220 -999.990 -999.990 1.070 ..P WKT 2010 10 24 21 09 55 31.3200 -97.3300 251.000 30.0 102.880 6.450 -999.990 -999.990 1.029 ..P WKT 2010 10 24 21 14 55 31.3200 -97.3300 251.000 122.0 107.943 6.070 -999.990 -999.990 1.079 ..P WKT 2010 10 24 21 19 55 31.3200 -97.3300 251.000 457.0 103.277 6.120 -999.990 -999.990 1.033 ..P WKT 2010 10 24 21 24 55 31.3200 -97.3300 251.000 30.0 102.585 6.210 -999.990 -999.990 1.026 ..P WKT 2010 10 24 21 29 55 31.3200 -97.3300 251.000 122.0 106.139 6.150 -999.990 -999.990 1.061 ..P WKT 2010 10 24 21 34 55 31.3200 -97.3300 251.000 457.0 109.281 6.460 -999.990 -999.990 1.093 ..P WKT 2010 10 24 21 44 55 31.3200 -97.3300 251.000 30.0 106.860 6.320 -999.990 -999.990 1.069 ..P WKT 2010 10 24 21 49 55 31.3200 -97.3300 251.000 122.0 113.892 6.670 -999.990 -999.990 1.139 ..P WKT 2010 10 24 21 54 55 31.3200 -97.3300 251.000 457.0 113.805 6.600 -999.990 -999.990 1.138 ..P WKT 2010 10 24 21 59 55 31.3200 -97.3300 251.000 30.0 104.139 7.400 -999.990 -999.990 1.041 ..P WKT 2010 10 24 22 04 55 31.3200 -97.3300 251.000 122.0 111.305 6.870 -999.990 -999.990 1.113 ..P WKT 2010 10 24 22 09 55 31.3200 -97.3300 251.000 457.0 111.903 6.430 -999.990 -999.990 1.119 ..P WKT 2010 10 24 22 19 55 31.3200 -97.3300 251.000 30.0 112.413 6.420 -999.990 -999.990 1.124 ..P WKT 2010 10 24 22 24 55 31.3200 -97.3300 251.000 122.0 118.070 7.220 -999.990 -999.990 1.181 ..P WKT 2010 10 24 22 29 55 31.3200 -97.3300 251.000 457.0 114.702 6.890 -999.990 -999.990 1.147 ..P WKT 2010 10 24 22 34 55 31.3200 -97.3300 251.000 30.0 114.752 7.170 -999.990 -999.990 1.148 ..P WKT 2010 10 24 22 39 55 31.3200 -97.3300 251.000 122.0 113.844 7.330 -999.990 -999.990 1.138 ..P WKT 2010 10 24 22 44 55 31.3200 -97.3300 251.000 457.0 113.074 6.400 -999.990 -999.990 1.131 ..P WKT 2010 10 24 22 54 55 31.3200 -97.3300 251.000 30.0 119.596 6.670 -999.990 -999.990 1.196 ..P WKT 2010 10 24 22 59 55 31.3200 -97.3300 251.000 122.0 116.776 6.860 -999.990 -999.990 1.168 ..P WKT 2010 10 24 23 04 55 31.3200 -97.3300 251.000 457.0 119.694 7.430 -999.990 -999.990 1.197 ..P WKT 2010 10 24 23 09 55 31.3200 -97.3300 251.000 30.0 117.831 9.310 -999.990 -999.990 1.178 ..P WKT 2010 10 24 23 14 55 31.3200 -97.3300 251.000 122.0 122.796 6.980 -999.990 -999.990 1.228 ..P WKT 2010 10 24 23 19 55 31.3200 -97.3300 251.000 457.0 120.933 6.910 -999.990 -999.990 1.209 ..P WKT 2010 10 24 23 29 55 31.3200 -97.3300 251.000 30.0 122.761 7.230 -999.990 -999.990 1.228 ..P WKT 2010 10 24 23 34 55 31.3200 -97.3300 251.000 122.0 131.636 6.860 -999.990 -999.990 1.316 ..P WKT 2010 10 24 23 39 55 31.3200 -97.3300 251.000 457.0 124.408 7.730 -999.990 -999.990 1.244 ..P WKT 2010 10 24 23 44 55 31.3200 -97.3300 251.000 30.0 125.367 7.240 -999.990 -999.990 1.254 ..P WKT 2010 10 24 23 49 55 31.3200 -97.3300 251.000 122.0 134.238 7.170 -999.990 -999.990 1.342 ..P WKT 2010 10 25 00 09 55 31.3200 -97.3300 251.000 457.0 121.911 6.540 -999.990 -999.990 1.219 ..P WKT 2010 10 25 00 10 25 31.3200 -97.3300 251.000 457.0 121.310 6.730 -999.990 -999.990 1.213 ..P WKT 2010 10 25 00 10 55 31.3200 -97.3300 251.000 457.0 127.527 6.760 -999.990 -999.990 1.275 ..P WKT 2010 10 25 00 11 25 31.3200 -97.3300 251.000 457.0 129.380 6.350 -999.990 -999.990 1.294 ..P WKT 2010 10 25 00 11 55 31.3200 -97.3300 251.000 457.0 129.052 6.290 -999.990 -999.990 1.291 ..P WKT 2010 10 25 00 12 25 31.3200 -97.3300 251.000 457.0 124.360 6.240 -999.990 -999.990 1.244 ..P WKT 2010 10 25 00 12 55 31.3200 -97.3300 251.000 457.0 129.486 6.440 -999.990 -999.990 1.295 ..P WKT 2010 10 25 00 13 25 31.3200 -97.3300 251.000 457.0 128.067 6.820 -999.990 -999.990 1.281 ..P WKT 2010 10 25 00 13 55 31.3200 -97.3300 251.000 457.0 128.556 7.230 -999.990 -999.990 1.286 ..P WKT 2010 10 25 00 14 25 31.3200 -97.3300 251.000 457.0 126.592 6.880 -999.990 -999.990 1.266 ..P WKT 2010 10 25 00 14 55 31.3200 -97.3300 251.000 457.0 117.537 6.670 -999.990 -999.990 1.175 ..P WKT 2010 10 25 00 19 55 31.3200 -97.3300 251.000 30.0 131.979 6.520 -999.990 -999.990 1.320 ..P WKT 2010 10 25 00 24 55 31.3200 -97.3300 251.000 122.0 136.331 6.700 -999.990 -999.990 1.363 ..P WKT 2010 10 25 00 29 55 31.3200 -97.3300 251.000 457.0 130.866 6.640 -999.990 -999.990 1.309 ..P WKT 2010 10 25 00 34 55 31.3200 -97.3300 251.000 30.0 135.764 6.960 -999.990 -999.990 1.358 ..P WKT 2010 10 25 00 39 55 31.3200 -97.3300 251.000 122.0 127.845 6.880 -999.990 -999.990 1.278 ..P WKT 2010 10 25 00 44 55 31.3200 -97.3300 251.000 457.0 120.198 6.890 -999.990 -999.990 1.202 ..P WKT 2010 10 25 00 54 55 31.3200 -97.3300 251.000 30.0 144.201 7.060 -999.990 -999.990 1.442 ..P WKT 2010 10 25 00 59 55 31.3200 -97.3300 251.000 122.0 127.588 6.920 -999.990 -999.990 1.276 ..P WKT 2010 10 25 01 04 55 31.3200 -97.3300 251.000 457.0 128.289 6.680 -999.990 -999.990 1.283 ..P WKT 2010 10 25 01 09 55 31.3200 -97.3300 251.000 30.0 128.854 6.600 -999.990 -999.990 1.289 ..P WKT 2010 10 25 01 14 55 31.3200 -97.3300 251.000 122.0 117.422 6.770 -999.990 -999.990 1.174 ..P WKT 2010 10 25 01 19 55 31.3200 -97.3300 251.000 457.0 124.121 6.540 -999.990 -999.990 1.241 ..P WKT 2010 10 25 01 29 55 31.3200 -97.3300 251.000 30.0 116.643 6.400 -999.990 -999.990 1.166 ..P WKT 2010 10 25 01 34 55 31.3200 -97.3300 251.000 122.0 125.094 6.540 -999.990 -999.990 1.251 ..P WKT 2010 10 25 01 39 55 31.3200 -97.3300 251.000 457.0 132.454 6.530 -999.990 -999.990 1.325 ..P WKT 2010 10 25 01 44 55 31.3200 -97.3300 251.000 30.0 117.188 7.480 -999.990 -999.990 1.172 ..P WKT 2010 10 25 01 49 55 31.3200 -97.3300 251.000 122.0 123.731 6.570 -999.990 -999.990 1.237 ..P WKT 2010 10 25 01 54 55 31.3200 -97.3300 251.000 457.0 129.319 6.790 -999.990 -999.990 1.293 ..P WKT 2010 10 25 02 04 55 31.3200 -97.3300 251.000 30.0 114.346 7.210 -999.990 -999.990 1.143 ..P WKT 2010 10 25 02 09 55 31.3200 -97.3300 251.000 122.0 119.544 6.300 -999.990 -999.990 1.195 ..P WKT 2010 10 25 02 14 55 31.3200 -97.3300 251.000 457.0 113.295 6.150 -999.990 -999.990 1.133 ..P WKT 2010 10 25 02 19 55 31.3200 -97.3300 251.000 30.0 119.856 5.910 -999.990 -999.990 1.199 ..P WKT 2010 10 25 02 24 55 31.3200 -97.3300 251.000 122.0 114.151 5.910 -999.990 -999.990 1.142 ..P WKT 2010 10 25 02 29 55 31.3200 -97.3300 251.000 457.0 113.626 5.710 -999.990 -999.990 1.136 ..P WKT 2010 10 25 02 39 55 31.3200 -97.3300 251.000 30.0 114.190 5.590 -999.990 -999.990 1.142 ..P WKT 2010 10 25 02 44 55 31.3200 -97.3300 251.000 122.0 120.186 6.180 -999.990 -999.990 1.202 ..P WKT 2010 10 25 02 49 55 31.3200 -97.3300 251.000 457.0 118.415 5.760 -999.990 -999.990 1.184 ..P WKT 2010 10 25 02 54 55 31.3200 -97.3300 251.000 30.0 126.318 6.450 -999.990 -999.990 1.263 ..P WKT 2010 10 25 02 59 55 31.3200 -97.3300 251.000 122.0 123.184 6.210 -999.990 -999.990 1.232 ..P WKT 2010 10 25 03 04 55 31.3200 -97.3300 251.000 457.0 118.279 6.050 -999.990 -999.990 1.183 ..P WKT 2010 10 25 03 14 55 31.3200 -97.3300 251.000 30.0 120.868 6.710 -999.990 -999.990 1.209 ..P WKT 2010 10 25 03 19 55 31.3200 -97.3300 251.000 122.0 129.723 6.080 -999.990 -999.990 1.297 ..P WKT 2010 10 25 03 24 55 31.3200 -97.3300 251.000 457.0 105.609 5.890 -999.990 -999.990 1.056 ..P WKT 2010 10 25 03 29 55 31.3200 -97.3300 251.000 30.0 122.639 6.170 -999.990 -999.990 1.226 ..P WKT 2010 10 25 03 34 55 31.3200 -97.3300 251.000 122.0 140.757 6.110 -999.990 -999.990 1.408 ..P WKT 2010 10 25 03 39 55 31.3200 -97.3300 251.000 457.0 110.378 5.540 -999.990 -999.990 1.104 ..P WKT 2010 10 25 03 49 55 31.3200 -97.3300 251.000 30.0 125.401 5.460 -999.990 -999.990 1.254 ..P WKT 2010 10 25 03 54 55 31.3200 -97.3300 251.000 122.0 145.736 5.750 -999.990 -999.990 1.457 ..P WKT 2010 10 25 03 59 55 31.3200 -97.3300 251.000 457.0 121.120 6.460 -999.990 -999.990 1.211 ..P WKT 2010 10 25 04 04 55 31.3200 -97.3300 251.000 30.0 128.106 6.640 -999.990 -999.990 1.281 ..P WKT 2010 10 25 04 09 55 31.3200 -97.3300 251.000 122.0 137.270 6.650 -999.990 -999.990 1.373 ..P WKT 2010 10 25 04 14 55 31.3200 -97.3300 251.000 457.0 110.205 6.350 -999.990 -999.990 1.102 ..P WKT 2010 10 25 04 24 55 31.3200 -97.3300 251.000 30.0 132.113 5.370 -999.990 -999.990 1.321 ..P WKT 2010 10 25 04 29 55 31.3200 -97.3300 251.000 122.0 130.147 6.630 -999.990 -999.990 1.301 ..P WKT 2010 10 25 04 34 55 31.3200 -97.3300 251.000 457.0 106.392 6.990 -999.990 -999.990 1.064 ..P WKT 2010 10 25 04 39 55 31.3200 -97.3300 251.000 30.0 128.941 6.410 -999.990 -999.990 1.289 ..P WKT 2010 10 25 04 44 55 31.3200 -97.3300 251.000 122.0 129.972 5.530 -999.990 -999.990 1.300 ..P WKT 2010 10 25 04 49 55 31.3200 -97.3300 251.000 457.0 110.848 5.570 -999.990 -999.990 1.108 ..P WKT 2010 10 25 05 04 55 31.3200 -97.3300 251.000 30.0 119.033 5.220 -999.990 -999.990 1.190 ..P WKT 2010 10 25 05 09 55 31.3200 -97.3300 251.000 122.0 114.236 5.230 -999.990 -999.990 1.142 ..P WKT 2010 10 25 05 14 55 31.3200 -97.3300 251.000 457.0 93.644 5.740 -999.990 -999.990 0.936 ..P WKT 2010 10 25 05 19 55 31.3200 -97.3300 251.000 30.0 110.225 6.340 -999.990 -999.990 1.102 ..P WKT 2010 10 25 05 24 55 31.3200 -97.3300 251.000 122.0 106.109 5.800 -999.990 -999.990 1.061 ..P WKT 2010 10 25 05 29 55 31.3200 -97.3300 251.000 457.0 107.303 4.840 -999.990 -999.990 1.073 ..P WKT 2010 10 25 05 39 55 31.3200 -97.3300 251.000 30.0 108.478 5.190 -999.990 -999.990 1.085 ..P WKT 2010 10 25 05 44 55 31.3200 -97.3300 251.000 122.0 108.186 5.560 -999.990 -999.990 1.082 ..P WKT 2010 10 25 05 49 55 31.3200 -97.3300 251.000 457.0 108.711 5.930 -999.990 -999.990 1.087 ..P WKT 2010 10 25 05 54 55 31.3200 -97.3300 251.000 30.0 111.143 5.660 -999.990 -999.990 1.111 ..P WKT 2010 10 25 05 59 55 31.3200 -97.3300 251.000 122.0 109.218 5.360 -999.990 -999.990 1.092 ..P WKT 2010 10 25 06 04 55 31.3200 -97.3300 251.000 457.0 102.936 5.950 -999.990 -999.990 1.029 ..P WKT 2010 10 25 06 14 55 31.3200 -97.3300 251.000 30.0 111.474 5.830 -999.990 -999.990 1.115 ..P WKT 2010 10 25 06 19 55 31.3200 -97.3300 251.000 122.0 116.219 5.390 -999.990 -999.990 1.162 ..P WKT 2010 10 25 06 24 55 31.3200 -97.3300 251.000 457.0 109.122 6.140 -999.990 -999.990 1.091 ..P WKT 2010 10 25 06 29 55 31.3200 -97.3300 251.000 30.0 110.328 5.230 -999.990 -999.990 1.103 ..P WKT 2010 10 25 06 34 55 31.3200 -97.3300 251.000 122.0 110.990 4.830 -999.990 -999.990 1.110 ..P WKT 2010 10 25 06 39 55 31.3200 -97.3300 251.000 457.0 109.473 5.510 -999.990 -999.990 1.095 ..P WKT 2010 10 25 06 49 55 31.3200 -97.3300 251.000 30.0 112.585 4.610 -999.990 -999.990 1.126 ..P WKT 2010 10 25 06 54 55 31.3200 -97.3300 251.000 122.0 114.626 5.370 -999.990 -999.990 1.146 ..P WKT 2010 10 25 06 59 55 31.3200 -97.3300 251.000 457.0 112.177 5.750 -999.990 -999.990 1.122 ..P WKT 2010 10 25 07 04 55 31.3200 -97.3300 251.000 30.0 107.278 4.570 -999.990 -999.990 1.073 ..P WKT 2010 10 25 07 09 55 31.3200 -97.3300 251.000 122.0 118.981 5.490 -999.990 -999.990 1.190 ..P WKT 2010 10 25 07 14 55 31.3200 -97.3300 251.000 457.0 114.627 4.300 -999.990 -999.990 1.146 ..P WKT 2010 10 25 07 24 55 31.3200 -97.3300 251.000 30.0 114.569 4.740 -999.990 -999.990 1.146 ..P WKT 2010 10 25 07 29 55 31.3200 -97.3300 251.000 122.0 112.878 5.020 -999.990 -999.990 1.129 ..P WKT 2010 10 25 07 34 55 31.3200 -97.3300 251.000 457.0 110.915 4.420 -999.990 -999.990 1.109 ..P WKT 2010 10 25 07 39 55 31.3200 -97.3300 251.000 30.0 104.054 4.270 -999.990 -999.990 1.041 ..P WKT 2010 10 25 07 44 55 31.3200 -97.3300 251.000 122.0 111.071 4.350 -999.990 -999.990 1.111 ..P WKT 2010 10 25 07 49 55 31.3200 -97.3300 251.000 457.0 111.286 4.420 -999.990 -999.990 1.113 ..P WKT 2010 10 25 07 59 55 31.3200 -97.3300 251.000 30.0 116.029 4.320 -999.990 -999.990 1.160 ..P WKT 2010 10 25 08 04 55 31.3200 -97.3300 251.000 122.0 109.129 4.110 -999.990 -999.990 1.091 ..P WKT 2010 10 25 08 09 55 31.3200 -97.3300 251.000 457.0 113.658 5.320 -999.990 -999.990 1.137 ..P WKT 2010 10 25 08 14 55 31.3200 -97.3300 251.000 30.0 109.208 4.220 -999.990 -999.990 1.092 ..P WKT 2010 10 25 08 19 55 31.3200 -97.3300 251.000 122.0 112.104 4.510 -999.990 -999.990 1.121 ..P WKT 2010 10 25 08 24 55 31.3200 -97.3300 251.000 457.0 114.455 5.130 -999.990 -999.990 1.145 ..P WKT 2010 10 25 08 34 55 31.3200 -97.3300 251.000 30.0 113.717 4.800 -999.990 -999.990 1.137 ..P WKT 2010 10 25 08 39 55 31.3200 -97.3300 251.000 122.0 117.157 4.770 -999.990 -999.990 1.172 ..P WKT 2010 10 25 08 44 55 31.3200 -97.3300 251.000 457.0 117.604 4.420 -999.990 -999.990 1.176 ..P WKT 2010 10 25 08 49 55 31.3200 -97.3300 251.000 30.0 108.258 4.490 -999.990 -999.990 1.083 ..P WKT 2010 10 25 08 54 55 31.3200 -97.3300 251.000 122.0 114.145 4.200 -999.990 -999.990 1.141 ..P WKT 2010 10 25 08 59 55 31.3200 -97.3300 251.000 457.0 117.177 4.980 -999.990 -999.990 1.172 ..P WKT 2010 10 25 09 09 55 31.3200 -97.3300 251.000 30.0 113.797 4.950 -999.990 -999.990 1.138 ..P WKT 2010 10 25 09 14 55 31.3200 -97.3300 251.000 122.0 109.018 4.660 -999.990 -999.990 1.090 ..P WKT 2010 10 25 09 19 55 31.3200 -97.3300 251.000 457.0 116.342 3.970 -999.990 -999.990 1.163 ..P WKT 2010 10 25 09 24 55 31.3200 -97.3300 251.000 30.0 106.804 4.050 -999.990 -999.990 1.068 ..P WKT 2010 10 25 09 29 55 31.3200 -97.3300 251.000 122.0 114.128 4.480 -999.990 -999.990 1.141 ..P WKT 2010 10 25 09 34 55 31.3200 -97.3300 251.000 457.0 114.924 4.820 -999.990 -999.990 1.149 ..P WKT 2010 10 25 09 44 55 31.3200 -97.3300 251.000 30.0 111.429 4.570 -999.990 -999.990 1.114 ..P WKT 2010 10 25 09 49 55 31.3200 -97.3300 251.000 122.0 117.334 4.470 -999.990 -999.990 1.173 ..P WKT 2010 10 25 09 54 55 31.3200 -97.3300 251.000 457.0 122.015 4.900 -999.990 -999.990 1.220 ..P WKT 2010 10 25 09 59 55 31.3200 -97.3300 251.000 30.0 110.789 5.040 -999.990 -999.990 1.108 ..P WKT 2010 10 25 10 04 55 31.3200 -97.3300 251.000 122.0 115.470 7.140 -999.990 -999.990 1.155 ..P WKT 2010 10 25 10 09 55 31.3200 -97.3300 251.000 457.0 122.190 5.100 -999.990 -999.990 1.222 ..P WKT 2010 10 25 10 19 55 31.3200 -97.3300 251.000 30.0 111.470 5.550 -999.990 -999.990 1.115 ..P WKT 2010 10 25 10 24 55 31.3200 -97.3300 251.000 122.0 119.045 6.090 -999.990 -999.990 1.190 ..P WKT 2010 10 25 10 29 55 31.3200 -97.3300 251.000 457.0 116.151 5.550 -999.990 -999.990 1.162 ..P WKT 2010 10 25 10 34 55 31.3200 -97.3300 251.000 30.0 116.656 5.910 -999.990 -999.990 1.167 ..P WKT 2010 10 25 10 39 55 31.3200 -97.3300 251.000 122.0 118.792 7.580 -999.990 -999.990 1.188 ..P WKT 2010 10 25 10 44 55 31.3200 -97.3300 251.000 457.0 113.181 6.000 -999.990 -999.990 1.132 ..P WKT 2010 10 25 10 54 55 31.3200 -97.3300 251.000 30.0 119.551 6.010 -999.990 -999.990 1.196 ..P WKT 2010 10 25 10 59 55 31.3200 -97.3300 251.000 122.0 121.473 6.100 -999.990 -999.990 1.215 ..P WKT 2010 10 25 11 04 55 31.3200 -97.3300 251.000 457.0 116.328 5.000 -999.990 -999.990 1.163 ..P WKT 2010 10 25 11 09 55 31.3200 -97.3300 251.000 30.0 111.727 4.750 -999.990 -999.990 1.117 ..P WKT 2010 10 25 11 14 55 31.3200 -97.3300 251.000 122.0 109.844 6.070 -999.990 -999.990 1.098 ..P WKT 2010 10 25 11 19 55 31.3200 -97.3300 251.000 457.0 121.822 4.530 -999.990 -999.990 1.218 ..P WKT 2010 10 25 11 29 55 31.3200 -97.3300 251.000 30.0 116.290 4.110 -999.990 -999.990 1.163 ..P WKT 2010 10 25 11 34 55 31.3200 -97.3300 251.000 122.0 119.163 4.120 -999.990 -999.990 1.192 ..P WKT 2010 10 25 11 39 55 31.3200 -97.3300 251.000 457.0 136.167 5.660 -999.990 -999.990 1.362 ..P WKT 2010 10 25 11 44 55 31.3200 -97.3300 251.000 30.0 118.659 4.050 -999.990 -999.990 1.187 ..P WKT 2010 10 25 11 49 55 31.3200 -97.3300 251.000 122.0 124.249 4.530 -999.990 -999.990 1.242 ..P WKT 2010 10 25 12 09 55 31.3200 -97.3300 251.000 457.0 114.438 4.800 -999.990 -999.990 1.144 ..P WKT 2010 10 25 12 10 25 31.3200 -97.3300 251.000 457.0 116.299 5.200 -999.990 -999.990 1.163 ..P WKT 2010 10 25 12 10 55 31.3200 -97.3300 251.000 457.0 114.899 5.950 -999.990 -999.990 1.149 ..P WKT 2010 10 25 12 11 25 31.3200 -97.3300 251.000 457.0 119.749 4.150 -999.990 -999.990 1.197 ..P WKT 2010 10 25 12 11 55 31.3200 -97.3300 251.000 457.0 119.164 4.720 -999.990 -999.990 1.192 ..P WKT 2010 10 25 12 12 25 31.3200 -97.3300 251.000 457.0 113.416 4.240 -999.990 -999.990 1.134 ..P WKT 2010 10 25 12 12 55 31.3200 -97.3300 251.000 457.0 116.907 4.100 -999.990 -999.990 1.169 ..P WKT 2010 10 25 12 13 25 31.3200 -97.3300 251.000 457.0 112.246 4.070 -999.990 -999.990 1.122 ..P WKT 2010 10 25 12 13 55 31.3200 -97.3300 251.000 457.0 119.269 4.130 -999.990 -999.990 1.193 ..P WKT 2010 10 25 12 14 25 31.3200 -97.3300 251.000 457.0 115.967 4.760 -999.990 -999.990 1.160 ..P WKT 2010 10 25 12 14 55 31.3200 -97.3300 251.000 457.0 114.024 4.680 -999.990 -999.990 1.140 ..P WKT 2010 10 25 12 19 55 31.3200 -97.3300 251.000 30.0 115.239 3.950 -999.990 -999.990 1.152 ..P WKT 2010 10 25 12 24 55 31.3200 -97.3300 251.000 122.0 116.184 4.350 -999.990 -999.990 1.162 ..P WKT 2010 10 25 12 29 55 31.3200 -97.3300 251.000 457.0 117.942 4.650 -999.990 -999.990 1.179 ..P WKT 2010 10 25 12 34 55 31.3200 -97.3300 251.000 30.0 111.550 4.170 -999.990 -999.990 1.115 ..P WKT 2010 10 25 12 39 55 31.3200 -97.3300 251.000 122.0 114.940 4.670 -999.990 -999.990 1.149 ..P WKT 2010 10 25 12 44 55 31.3200 -97.3300 251.000 457.0 114.526 3.480 -999.990 -999.990 1.145 ..P WKT 2010 10 25 12 54 55 31.3200 -97.3300 251.000 30.0 119.018 3.760 -999.990 -999.990 1.190 ..P WKT 2010 10 25 12 59 55 31.3200 -97.3300 251.000 122.0 120.394 4.400 -999.990 -999.990 1.204 ..P WKT 2010 10 25 13 04 55 31.3200 -97.3300 251.000 457.0 109.134 5.300 -999.990 -999.990 1.091 ..P WKT 2010 10 25 13 09 55 31.3200 -97.3300 251.000 30.0 120.699 5.160 -999.990 -999.990 1.207 ..P WKT 2010 10 25 13 14 55 31.3200 -97.3300 251.000 122.0 119.900 4.870 -999.990 -999.990 1.199 ..P WKT 2010 10 25 13 19 55 31.3200 -97.3300 251.000 457.0 118.422 4.360 -999.990 -999.990 1.184 ..P WKT 2010 10 25 13 29 55 31.3200 -97.3300 251.000 30.0 124.918 4.120 -999.990 -999.990 1.249 ..P WKT 2010 10 25 13 34 55 31.3200 -97.3300 251.000 122.0 126.235 4.880 -999.990 -999.990 1.262 ..P WKT 2010 10 25 13 39 55 31.3200 -97.3300 251.000 457.0 114.783 5.650 -999.990 -999.990 1.148 ..P WKT 2010 10 25 13 44 55 31.3200 -97.3300 251.000 30.0 123.979 5.610 -999.990 -999.990 1.240 ..P WKT 2010 10 25 13 49 55 31.3200 -97.3300 251.000 122.0 124.888 5.410 -999.990 -999.990 1.249 ..P WKT 2010 10 25 13 54 55 31.3200 -97.3300 251.000 457.0 112.485 4.120 -999.990 -999.990 1.125 ..P WKT 2010 10 25 14 04 55 31.3200 -97.3300 251.000 30.0 117.952 4.210 -999.990 -999.990 1.180 ..P WKT 2010 10 25 14 09 55 31.3200 -97.3300 251.000 122.0 123.189 6.490 -999.990 -999.990 1.232 ..P WKT 2010 10 25 14 14 55 31.3200 -97.3300 251.000 457.0 110.359 5.470 -999.990 -999.990 1.104 ..P WKT 2010 10 25 14 19 55 31.3200 -97.3300 251.000 30.0 125.512 4.900 -999.990 -999.990 1.255 ..P WKT 2010 10 25 14 24 55 31.3200 -97.3300 251.000 122.0 132.786 5.090 -999.990 -999.990 1.328 ..P WKT 2010 10 25 14 29 55 31.3200 -97.3300 251.000 457.0 124.031 4.260 -999.990 -999.990 1.240 ..P WKT 2010 10 25 14 39 55 31.3200 -97.3300 251.000 30.0 141.218 4.640 -999.990 -999.990 1.412 ..P WKT 2010 10 25 14 44 55 31.3200 -97.3300 251.000 122.0 145.425 4.600 -999.990 -999.990 1.454 ..P WKT 2010 10 25 14 49 55 31.3200 -97.3300 251.000 457.0 126.271 4.360 -999.990 -999.990 1.263 ..P WKT 2010 10 25 14 54 55 31.3200 -97.3300 251.000 30.0 145.963 5.900 -999.990 -999.990 1.460 ..P WKT 2010 10 25 14 59 55 31.3200 -97.3300 251.000 122.0 142.836 5.780 -999.990 -999.990 1.428 ..P WKT 2010 10 25 15 04 55 31.3200 -97.3300 251.000 457.0 132.647 4.790 -999.990 -999.990 1.326 ..P WKT 2010 10 25 15 14 55 31.3200 -97.3300 251.000 30.0 137.647 4.930 -999.990 -999.990 1.376 ..P WKT 2010 10 25 15 19 55 31.3200 -97.3300 251.000 122.0 146.316 5.180 -999.990 -999.990 1.463 ..P WKT 2010 10 25 15 24 55 31.3200 -97.3300 251.000 457.0 127.823 5.360 -999.990 -999.990 1.278 ..P WKT 2010 10 25 15 29 55 31.3200 -97.3300 251.000 30.0 144.370 4.070 -999.990 -999.990 1.444 ..P WKT 2010 10 25 15 34 55 31.3200 -97.3300 251.000 122.0 142.175 4.090 -999.990 -999.990 1.422 ..P WKT 2010 10 25 15 39 55 31.3200 -97.3300 251.000 457.0 130.473 4.530 -999.990 -999.990 1.305 ..P WKT 2010 10 25 15 49 55 31.3200 -97.3300 251.000 30.0 138.732 3.940 -999.990 -999.990 1.387 ..P WKT 2010 10 25 15 54 55 31.3200 -97.3300 251.000 122.0 142.397 4.790 -999.990 -999.990 1.424 ..P WKT 2010 10 25 15 59 55 31.3200 -97.3300 251.000 457.0 135.467 4.160 -999.990 -999.990 1.355 ..P WKT 2010 10 25 16 04 55 31.3200 -97.3300 251.000 30.0 136.959 4.560 -999.990 -999.990 1.370 ..P WKT 2010 10 25 16 09 55 31.3200 -97.3300 251.000 122.0 137.634 4.140 -999.990 -999.990 1.376 ..P WKT 2010 10 25 16 14 55 31.3200 -97.3300 251.000 457.0 135.595 5.770 -999.990 -999.990 1.356 ..P WKT 2010 10 25 16 24 55 31.3200 -97.3300 251.000 30.0 129.130 4.310 -999.990 -999.990 1.291 ..P WKT 2010 10 25 16 29 55 31.3200 -97.3300 251.000 122.0 131.221 4.300 -999.990 -999.990 1.312 ..P WKT 2010 10 25 16 34 55 31.3200 -97.3300 251.000 457.0 130.598 4.390 -999.990 -999.990 1.306 ..P WKT 2010 10 25 16 39 55 31.3200 -97.3300 251.000 30.0 131.604 5.810 -999.990 -999.990 1.316 ..P WKT 2010 10 25 16 44 55 31.3200 -97.3300 251.000 122.0 136.955 5.880 -999.990 -999.990 1.370 ..P WKT 2010 10 25 16 49 55 31.3200 -97.3300 251.000 457.0 126.419 4.960 -999.990 -999.990 1.264 ..P WKT 2010 10 25 17 04 55 31.3200 -97.3300 251.000 30.0 131.794 4.740 -999.990 -999.990 1.318 ..P WKT 2010 10 25 17 09 55 31.3200 -97.3300 251.000 122.0 132.213 5.140 -999.990 -999.990 1.322 ..P WKT 2010 10 25 17 14 55 31.3200 -97.3300 251.000 457.0 133.990 5.090 -999.990 -999.990 1.340 ..P WKT 2010 10 25 17 19 55 31.3200 -97.3300 251.000 30.0 133.594 5.560 -999.990 -999.990 1.336 ..P WKT 2010 10 25 17 24 55 31.3200 -97.3300 251.000 122.0 144.332 5.200 -999.990 -999.990 1.443 ..P WKT 2010 10 25 17 29 55 31.3200 -97.3300 251.000 457.0 133.345 4.630 -999.990 -999.990 1.333 ..P WKT 2010 10 25 17 39 55 31.3200 -97.3300 251.000 30.0 146.311 4.860 -999.990 -999.990 1.463 ..P WKT 2010 10 25 17 44 55 31.3200 -97.3300 251.000 122.0 151.254 5.060 -999.990 -999.990 1.513 ..P WKT 2010 10 25 17 49 55 31.3200 -97.3300 251.000 457.0 139.905 5.800 -999.990 -999.990 1.399 ..P WKT 2010 10 25 17 54 55 31.3200 -97.3300 251.000 30.0 148.242 5.580 -999.990 -999.990 1.482 ..P WKT 2010 10 25 17 59 55 31.3200 -97.3300 251.000 122.0 145.989 5.820 -999.990 -999.990 1.460 ..P WKT 2010 10 25 18 04 55 31.3200 -97.3300 251.000 457.0 144.144 6.950 -999.990 -999.990 1.441 ..P WKT 2010 10 25 18 14 55 31.3200 -97.3300 251.000 30.0 141.306 6.200 -999.990 -999.990 1.413 ..P WKT 2010 10 25 18 19 55 31.3200 -97.3300 251.000 122.0 139.364 5.790 -999.990 -999.990 1.394 ..P WKT 2010 10 25 18 24 55 31.3200 -97.3300 251.000 457.0 142.309 6.770 -999.990 -999.990 1.423 ..P WKT 2010 10 25 18 29 55 31.3200 -97.3300 251.000 30.0 139.145 5.710 -999.990 -999.990 1.391 ..P WKT 2010 10 25 18 34 55 31.3200 -97.3300 251.000 122.0 144.940 5.550 -999.990 -999.990 1.449 ..P WKT 2010 10 25 18 39 55 31.3200 -97.3300 251.000 457.0 136.753 5.570 -999.990 -999.990 1.368 ..P WKT 2010 10 25 18 49 55 31.3200 -97.3300 251.000 30.0 138.009 5.090 -999.990 -999.990 1.380 ..P WKT 2010 10 25 18 54 55 31.3200 -97.3300 251.000 122.0 143.648 5.820 -999.990 -999.990 1.436 ..P WKT 2010 10 25 18 59 55 31.3200 -97.3300 251.000 457.0 139.244 5.890 -999.990 -999.990 1.392 ..P WKT 2010 10 25 19 04 55 31.3200 -97.3300 251.000 30.0 140.269 7.200 -999.990 -999.990 1.403 ..P WKT 2010 10 25 19 09 55 31.3200 -97.3300 251.000 122.0 139.122 6.260 -999.990 -999.990 1.391 ..P WKT 2010 10 25 19 14 55 31.3200 -97.3300 251.000 457.0 141.232 5.910 -999.990 -999.990 1.412 ..P WKT 2010 10 25 19 24 55 31.3200 -97.3300 251.000 30.0 145.531 5.370 -999.990 -999.990 1.455 ..P WKT 2010 10 25 19 29 55 31.3200 -97.3300 251.000 122.0 142.019 6.600 -999.990 -999.990 1.420 ..P WKT 2010 10 25 19 34 55 31.3200 -97.3300 251.000 457.0 134.434 6.890 -999.990 -999.990 1.344 ..P WKT 2010 10 25 19 39 55 31.3200 -97.3300 251.000 30.0 126.850 7.610 -999.990 -999.990 1.268 ..P WKT 2010 10 25 19 44 55 31.3200 -97.3300 251.000 122.0 134.195 6.660 -999.990 -999.990 1.342 ..P WKT 2010 10 25 19 49 55 31.3200 -97.3300 251.000 457.0 127.426 5.540 -999.990 -999.990 1.274 ..P WKT 2010 10 25 19 59 55 31.3200 -97.3300 251.000 30.0 121.178 6.290 -999.990 -999.990 1.212 ..P WKT 2010 10 25 20 04 55 31.3200 -97.3300 251.000 122.0 123.598 6.660 -999.990 -999.990 1.236 ..P WKT 2010 10 25 20 09 55 31.3200 -97.3300 251.000 457.0 124.390 7.230 -999.990 -999.990 1.244 ..P WKT 2010 10 25 20 14 55 31.3200 -97.3300 251.000 30.0 122.468 6.620 -999.990 -999.990 1.225 ..P WKT 2010 10 25 20 19 55 31.3200 -97.3300 251.000 122.0 129.232 6.270 -999.990 -999.990 1.292 ..P WKT 2010 10 25 20 24 55 31.3200 -97.3300 251.000 457.0 131.653 6.190 -999.990 -999.990 1.317 ..P WKT 2010 10 25 20 34 55 31.3200 -97.3300 251.000 30.0 133.296 6.000 -999.990 -999.990 1.333 ..P WKT 2010 10 25 20 39 55 31.3200 -97.3300 251.000 122.0 135.775 6.330 -999.990 -999.990 1.358 ..P WKT 2010 10 25 20 44 55 31.3200 -97.3300 251.000 457.0 134.860 7.470 -999.990 -999.990 1.349 ..P WKT 2010 10 25 20 49 55 31.3200 -97.3300 251.000 30.0 131.232 5.680 -999.990 -999.990 1.312 ..P WKT 2010 10 25 20 54 55 31.3200 -97.3300 251.000 122.0 135.203 5.890 -999.990 -999.990 1.352 ..P WKT 2010 10 25 20 59 55 31.3200 -97.3300 251.000 457.0 128.455 5.870 -999.990 -999.990 1.285 ..P WKT 2010 10 25 21 09 55 31.3200 -97.3300 251.000 30.0 128.256 5.440 -999.990 -999.990 1.283 ..P WKT 2010 10 25 21 14 55 31.3200 -97.3300 251.000 122.0 143.896 5.920 -999.990 -999.990 1.439 ..P WKT 2010 10 25 21 19 55 31.3200 -97.3300 251.000 457.0 129.142 5.450 -999.990 -999.990 1.291 ..P WKT 2010 10 25 21 24 55 31.3200 -97.3300 251.000 30.0 125.243 6.570 -999.990 -999.990 1.252 ..P WKT 2010 10 25 21 29 55 31.3200 -97.3300 251.000 122.0 144.411 6.040 -999.990 -999.990 1.444 ..P WKT 2010 10 25 21 34 55 31.3200 -97.3300 251.000 457.0 138.612 5.900 -999.990 -999.990 1.386 ..P WKT 2010 10 25 21 44 55 31.3200 -97.3300 251.000 30.0 132.714 6.510 -999.990 -999.990 1.327 ..P WKT 2010 10 25 21 49 55 31.3200 -97.3300 251.000 122.0 137.363 6.840 -999.990 -999.990 1.374 ..P WKT 2010 10 25 21 54 55 31.3200 -97.3300 251.000 457.0 131.701 6.010 -999.990 -999.990 1.317 ..P WKT 2010 10 25 21 59 55 31.3200 -97.3300 251.000 30.0 132.551 5.860 -999.990 -999.990 1.326 ..P WKT 2010 10 25 22 04 55 31.3200 -97.3300 251.000 122.0 136.793 5.980 -999.990 -999.990 1.368 ..P WKT 2010 10 25 22 09 55 31.3200 -97.3300 251.000 457.0 133.573 6.530 -999.990 -999.990 1.336 ..P WKT 2010 10 25 22 19 55 31.3200 -97.3300 251.000 30.0 132.075 6.180 -999.990 -999.990 1.321 ..P WKT 2010 10 25 22 24 55 31.3200 -97.3300 251.000 122.0 138.952 5.960 -999.990 -999.990 1.390 ..P WKT 2010 10 25 22 29 55 31.3200 -97.3300 251.000 457.0 138.232 6.030 -999.990 -999.990 1.382 ..P WKT 2010 10 25 22 34 55 31.3200 -97.3300 251.000 30.0 134.528 5.860 -999.990 -999.990 1.345 ..P WKT 2010 10 25 22 39 55 31.3200 -97.3300 251.000 122.0 131.909 6.280 -999.990 -999.990 1.319 ..P WKT 2010 10 25 22 44 55 31.3200 -97.3300 251.000 457.0 132.003 5.680 -999.990 -999.990 1.320 ..P WKT 2010 10 25 22 54 55 31.3200 -97.3300 251.000 30.0 130.059 5.700 -999.990 -999.990 1.301 ..P WKT 2010 10 25 22 59 55 31.3200 -97.3300 251.000 122.0 129.107 6.160 -999.990 -999.990 1.291 ..P WKT 2010 10 25 23 04 55 31.3200 -97.3300 251.000 457.0 129.783 6.510 -999.990 -999.990 1.298 ..P WKT 2010 10 25 23 09 55 31.3200 -97.3300 251.000 30.0 124.761 5.850 -999.990 -999.990 1.248 ..P WKT 2010 10 25 23 14 55 31.3200 -97.3300 251.000 122.0 129.234 5.760 -999.990 -999.990 1.292 ..P WKT 2010 10 25 23 19 55 31.3200 -97.3300 251.000 457.0 129.638 5.920 -999.990 -999.990 1.296 ..P WKT 2010 10 25 23 29 55 31.3200 -97.3300 251.000 30.0 135.158 6.140 -999.990 -999.990 1.352 ..P WKT 2010 10 25 23 34 55 31.3200 -97.3300 251.000 122.0 136.204 7.410 -999.990 -999.990 1.362 ..P WKT 2010 10 25 23 39 55 31.3200 -97.3300 251.000 457.0 133.453 6.170 -999.990 -999.990 1.335 ..P WKT 2010 10 25 23 44 55 31.3200 -97.3300 251.000 30.0 137.211 6.900 -999.990 -999.990 1.372 ..P WKT 2010 10 25 23 49 55 31.3200 -97.3300 251.000 122.0 136.493 6.780 -999.990 -999.990 1.365 ..P WKT 2010 10 26 00 09 55 31.3200 -97.3300 251.000 457.0 128.381 7.470 -999.990 -999.990 1.284 ..P WKT 2010 10 26 00 10 25 31.3200 -97.3300 251.000 457.0 128.878 7.460 -999.990 -999.990 1.289 ..P WKT 2010 10 26 00 10 55 31.3200 -97.3300 251.000 457.0 126.391 7.520 -999.990 -999.990 1.264 ..P WKT 2010 10 26 00 11 25 31.3200 -97.3300 251.000 457.0 122.004 7.710 -999.990 -999.990 1.220 ..P WKT 2010 10 26 00 11 55 31.3200 -97.3300 251.000 457.0 123.993 7.430 -999.990 -999.990 1.240 ..P WKT 2010 10 26 00 12 25 31.3200 -97.3300 251.000 457.0 124.083 7.500 -999.990 -999.990 1.241 ..P WKT 2010 10 26 00 12 55 31.3200 -97.3300 251.000 457.0 127.836 7.620 -999.990 -999.990 1.278 ..P WKT 2010 10 26 00 13 25 31.3200 -97.3300 251.000 457.0 122.364 7.370 -999.990 -999.990 1.224 ..P WKT 2010 10 26 00 13 55 31.3200 -97.3300 251.000 457.0 125.303 7.470 -999.990 -999.990 1.253 ..P WKT 2010 10 26 00 14 25 31.3200 -97.3300 251.000 457.0 130.682 7.470 -999.990 -999.990 1.307 ..P WKT 2010 10 26 00 14 55 31.3200 -97.3300 251.000 457.0 125.753 9.020 -999.990 -999.990 1.258 ..P WKT 2010 10 26 00 19 55 31.3200 -97.3300 251.000 30.0 129.773 7.810 -999.990 -999.990 1.298 ..P WKT 2010 10 26 00 24 55 31.3200 -97.3300 251.000 122.0 127.011 7.180 -999.990 -999.990 1.270 ..P WKT 2010 10 26 00 29 55 31.3200 -97.3300 251.000 457.0 131.031 6.970 -999.990 -999.990 1.310 ..P WKT 2010 10 26 00 34 55 31.3200 -97.3300 251.000 30.0 135.730 6.610 -999.990 -999.990 1.357 ..P WKT 2010 10 26 00 39 55 31.3200 -97.3300 251.000 122.0 127.540 6.540 -999.990 -999.990 1.275 ..P WKT 2010 10 26 00 44 55 31.3200 -97.3300 251.000 457.0 126.134 6.300 -999.990 -999.990 1.261 ..P WKT 2010 10 26 00 54 55 31.3200 -97.3300 251.000 30.0 136.718 6.480 -999.990 -999.990 1.367 ..P WKT 2010 10 26 00 59 55 31.3200 -97.3300 251.000 122.0 129.303 6.210 -999.990 -999.990 1.293 ..P WKT 2010 10 26 01 04 55 31.3200 -97.3300 251.000 457.0 123.245 6.600 -999.990 -999.990 1.232 ..P WKT 2010 10 26 01 09 55 31.3200 -97.3300 251.000 30.0 121.259 6.470 -999.990 -999.990 1.213 ..P WKT 2010 10 26 01 14 55 31.3200 -97.3300 251.000 122.0 127.144 6.290 -999.990 -999.990 1.271 ..P WKT 2010 10 26 01 19 55 31.3200 -97.3300 251.000 457.0 112.804 6.430 -999.990 -999.990 1.128 ..P WKT 2010 10 26 01 29 55 31.3200 -97.3300 251.000 30.0 124.810 6.520 -999.990 -999.990 1.248 ..P WKT 2010 10 26 01 34 55 31.3200 -97.3300 251.000 122.0 131.473 6.730 -999.990 -999.990 1.315 ..P WKT 2010 10 26 01 39 55 31.3200 -97.3300 251.000 457.0 120.621 6.020 -999.990 -999.990 1.206 ..P WKT 2010 10 26 01 44 55 31.3200 -97.3300 251.000 30.0 123.619 5.970 -999.990 -999.990 1.236 ..P WKT 2010 10 26 01 49 55 31.3200 -97.3300 251.000 122.0 125.802 5.870 -999.990 -999.990 1.258 ..P WKT 2010 10 26 01 54 55 31.3200 -97.3300 251.000 457.0 130.701 6.070 -999.990 -999.990 1.307 ..P WKT 2010 10 26 02 04 55 31.3200 -97.3300 251.000 30.0 120.323 6.070 -999.990 -999.990 1.203 ..P WKT 2010 10 26 02 09 55 31.3200 -97.3300 251.000 122.0 120.798 6.010 -999.990 -999.990 1.208 ..P WKT 2010 10 26 02 14 55 31.3200 -97.3300 251.000 457.0 128.066 6.200 -999.990 -999.990 1.281 ..P WKT 2010 10 26 02 19 55 31.3200 -97.3300 251.000 30.0 121.751 6.460 -999.990 -999.990 1.218 ..P WKT 2010 10 26 02 24 55 31.3200 -97.3300 251.000 122.0 127.932 6.020 -999.990 -999.990 1.279 ..P WKT 2010 10 26 02 29 55 31.3200 -97.3300 251.000 457.0 126.778 5.990 -999.990 -999.990 1.268 ..P WKT 2010 10 26 02 39 55 31.3200 -97.3300 251.000 30.0 123.655 6.130 -999.990 -999.990 1.237 ..P WKT 2010 10 26 02 44 55 31.3200 -97.3300 251.000 122.0 126.577 6.160 -999.990 -999.990 1.266 ..P WKT 2010 10 26 02 49 55 31.3200 -97.3300 251.000 457.0 126.782 6.210 -999.990 -999.990 1.268 ..P WKT 2010 10 26 02 54 55 31.3200 -97.3300 251.000 30.0 127.258 6.350 -999.990 -999.990 1.273 ..P WKT 2010 10 26 02 59 55 31.3200 -97.3300 251.000 122.0 132.084 6.560 -999.990 -999.990 1.321 ..P WKT 2010 10 26 03 04 55 31.3200 -97.3300 251.000 457.0 123.862 6.430 -999.990 -999.990 1.239 ..P WKT 2010 10 26 03 14 55 31.3200 -97.3300 251.000 30.0 128.214 6.540 -999.990 -999.990 1.282 ..P WKT 2010 10 26 03 19 55 31.3200 -97.3300 251.000 122.0 132.361 6.480 -999.990 -999.990 1.324 ..P WKT 2010 10 26 03 24 55 31.3200 -97.3300 251.000 457.0 126.992 6.270 -999.990 -999.990 1.270 ..P WKT 2010 10 26 03 29 55 31.3200 -97.3300 251.000 30.0 126.245 6.790 -999.990 -999.990 1.262 ..P WKT 2010 10 26 03 34 55 31.3200 -97.3300 251.000 122.0 131.208 6.340 -999.990 -999.990 1.312 ..P WKT 2010 10 26 03 39 55 31.3200 -97.3300 251.000 457.0 126.654 6.510 -999.990 -999.990 1.267 ..P WKT 2010 10 26 03 49 55 31.3200 -97.3300 251.000 30.0 127.802 5.950 -999.990 -999.990 1.278 ..P WKT 2010 10 26 03 54 55 31.3200 -97.3300 251.000 122.0 128.474 6.040 -999.990 -999.990 1.285 ..P WKT 2010 10 26 03 59 55 31.3200 -97.3300 251.000 457.0 123.433 6.100 -999.990 -999.990 1.234 ..P WKT 2010 10 26 04 04 55 31.3200 -97.3300 251.000 30.0 117.439 6.090 -999.990 -999.990 1.174 ..P WKT 2010 10 26 04 09 55 31.3200 -97.3300 251.000 122.0 126.679 5.970 -999.990 -999.990 1.267 ..P WKT 2010 10 26 04 14 55 31.3200 -97.3300 251.000 457.0 120.141 6.160 -999.990 -999.990 1.201 ..P WKT 2010 10 26 04 24 55 31.3200 -97.3300 251.000 30.0 121.657 6.160 -999.990 -999.990 1.217 ..P WKT 2010 10 26 04 29 55 31.3200 -97.3300 251.000 122.0 123.864 6.220 -999.990 -999.990 1.239 ..P WKT 2010 10 26 04 34 55 31.3200 -97.3300 251.000 457.0 129.064 6.460 -999.990 -999.990 1.291 ..P WKT 2010 10 26 04 39 55 31.3200 -97.3300 251.000 30.0 126.237 7.190 -999.990 -999.990 1.262 ..P WKT 2010 10 26 04 44 55 31.3200 -97.3300 251.000 122.0 131.438 6.350 -999.990 -999.990 1.314 ..P WKT 2010 10 26 04 49 55 31.3200 -97.3300 251.000 457.0 133.372 6.700 -999.990 -999.990 1.334 ..P WKT 2010 10 26 05 04 55 31.3200 -97.3300 251.000 30.0 128.151 5.980 -999.990 -999.990 1.282 ..P WKT 2010 10 26 05 09 55 31.3200 -97.3300 251.000 122.0 121.237 6.430 -999.990 -999.990 1.212 ..P WKT 2010 10 26 05 14 55 31.3200 -97.3300 251.000 457.0 127.389 6.310 -999.990 -999.990 1.274 ..P WKT 2010 10 26 05 19 55 31.3200 -97.3300 251.000 30.0 116.118 6.130 -999.990 -999.990 1.161 ..P WKT 2010 10 26 05 24 55 31.3200 -97.3300 251.000 122.0 126.900 6.340 -999.990 -999.990 1.269 ..P WKT 2010 10 26 05 29 55 31.3200 -97.3300 251.000 457.0 126.519 6.800 -999.990 -999.990 1.265 ..P WKT 2010 10 26 05 39 55 31.3200 -97.3300 251.000 30.0 122.511 6.080 -999.990 -999.990 1.225 ..P WKT 2010 10 26 05 44 55 31.3200 -97.3300 251.000 122.0 131.547 6.400 -999.990 -999.990 1.315 ..P WKT 2010 10 26 05 49 55 31.3200 -97.3300 251.000 457.0 130.508 6.690 -999.990 -999.990 1.305 ..P WKT 2010 10 26 05 54 55 31.3200 -97.3300 251.000 30.0 118.573 6.780 -999.990 -999.990 1.186 ..P WKT 2010 10 26 05 59 55 31.3200 -97.3300 251.000 122.0 128.973 6.450 -999.990 -999.990 1.290 ..P WKT 2010 10 26 06 04 55 31.3200 -97.3300 251.000 457.0 133.654 6.200 -999.990 -999.990 1.337 ..P WKT 2010 10 26 06 14 55 31.3200 -97.3300 251.000 30.0 129.979 6.870 -999.990 -999.990 1.300 ..P WKT 2010 10 26 06 19 55 31.3200 -97.3300 251.000 122.0 127.343 6.810 -999.990 -999.990 1.273 ..P WKT 2010 10 26 06 24 55 31.3200 -97.3300 251.000 457.0 132.608 6.850 -999.990 -999.990 1.326 ..P WKT 2010 10 26 06 29 55 31.3200 -97.3300 251.000 30.0 129.972 6.770 -999.990 -999.990 1.300 ..P WKT 2010 10 26 06 34 55 31.3200 -97.3300 251.000 122.0 128.698 6.540 -999.990 -999.990 1.287 ..P WKT 2010 10 26 06 39 55 31.3200 -97.3300 251.000 457.0 131.784 6.260 -999.990 -999.990 1.318 ..P WKT 2010 10 26 06 49 55 31.3200 -97.3300 251.000 30.0 124.720 6.410 -999.990 -999.990 1.247 ..P WKT 2010 10 26 06 54 55 31.3200 -97.3300 251.000 122.0 135.282 6.330 -999.990 -999.990 1.353 ..P WKT 2010 10 26 06 59 55 31.3200 -97.3300 251.000 457.0 136.851 6.700 -999.990 -999.990 1.369 ..P WKT 2010 10 26 07 04 55 31.3200 -97.3300 251.000 30.0 123.700 6.170 -999.990 -999.990 1.237 ..P WKT 2010 10 26 07 09 55 31.3200 -97.3300 251.000 122.0 133.446 6.350 -999.990 -999.990 1.334 ..P WKT 2010 10 26 07 14 55 31.3200 -97.3300 251.000 457.0 138.013 6.160 -999.990 -999.990 1.380 ..P WKT 2010 10 26 07 24 55 31.3200 -97.3300 251.000 30.0 128.162 6.130 -999.990 -999.990 1.282 ..P WKT 2010 10 26 07 29 55 31.3200 -97.3300 251.000 122.0 131.191 6.600 -999.990 -999.990 1.312 ..P WKT 2010 10 26 07 34 55 31.3200 -97.3300 251.000 457.0 145.538 6.650 -999.990 -999.990 1.455 ..P WKT 2010 10 26 07 39 55 31.3200 -97.3300 251.000 30.0 131.798 6.550 -999.990 -999.990 1.318 ..P WKT 2010 10 26 07 44 55 31.3200 -97.3300 251.000 122.0 134.009 6.910 -999.990 -999.990 1.340 ..P WKT 2010 10 26 07 49 55 31.3200 -97.3300 251.000 457.0 143.449 6.810 -999.990 -999.990 1.434 ..P WKT 2010 10 26 07 59 55 31.3200 -97.3300 251.000 30.0 134.530 7.630 -999.990 -999.990 1.345 ..P WKT 2010 10 26 08 04 55 31.3200 -97.3300 251.000 122.0 138.399 6.560 -999.990 -999.990 1.384 ..P WKT 2010 10 26 08 09 55 31.3200 -97.3300 251.000 457.0 139.677 6.240 -999.990 -999.990 1.397 ..P WKT 2010 10 26 08 14 55 31.3200 -97.3300 251.000 30.0 131.952 6.580 -999.990 -999.990 1.320 ..P WKT 2010 10 26 08 19 55 31.3200 -97.3300 251.000 122.0 144.006 6.130 -999.990 -999.990 1.440 ..P WKT 2010 10 26 08 24 55 31.3200 -97.3300 251.000 457.0 140.373 5.950 -999.990 -999.990 1.404 ..P WKT 2010 10 26 08 34 55 31.3200 -97.3300 251.000 30.0 138.115 5.800 -999.990 -999.990 1.381 ..P WKT 2010 10 26 08 39 55 31.3200 -97.3300 251.000 122.0 139.628 5.650 -999.990 -999.990 1.396 ..P WKT 2010 10 26 08 44 55 31.3200 -97.3300 251.000 457.0 136.637 6.290 -999.990 -999.990 1.366 ..P WKT 2010 10 26 08 49 55 31.3200 -97.3300 251.000 30.0 133.646 5.820 -999.990 -999.990 1.336 ..P WKT 2010 10 26 08 54 55 31.3200 -97.3300 251.000 122.0 143.209 6.280 -999.990 -999.990 1.432 ..P WKT 2010 10 26 08 59 55 31.3200 -97.3300 251.000 457.0 142.812 5.750 -999.990 -999.990 1.428 ..P WKT 2010 10 26 09 09 55 31.3200 -97.3300 251.000 30.0 135.522 6.160 -999.990 -999.990 1.355 ..P WKT 2010 10 26 09 14 55 31.3200 -97.3300 251.000 122.0 137.640 6.230 -999.990 -999.990 1.376 ..P WKT 2010 10 26 09 19 55 31.3200 -97.3300 251.000 457.0 142.488 5.780 -999.990 -999.990 1.425 ..P WKT 2010 10 26 09 24 55 31.3200 -97.3300 251.000 30.0 141.192 6.930 -999.990 -999.990 1.412 ..P WKT 2010 10 26 09 29 55 31.3200 -97.3300 251.000 122.0 139.897 6.060 -999.990 -999.990 1.399 ..P WKT 2010 10 26 09 34 55 31.3200 -97.3300 251.000 457.0 137.510 5.890 -999.990 -999.990 1.375 ..P WKT 2010 10 26 09 44 55 31.3200 -97.3300 251.000 30.0 139.327 6.300 -999.990 -999.990 1.393 ..P WKT 2010 10 26 09 49 55 31.3200 -97.3300 251.000 122.0 141.757 5.810 -999.990 -999.990 1.418 ..P WKT 2010 10 26 09 54 55 31.3200 -97.3300 251.000 457.0 144.734 5.880 -999.990 -999.990 1.447 ..P WKT 2010 10 26 09 59 55 31.3200 -97.3300 251.000 30.0 144.980 6.570 -999.990 -999.990 1.450 ..P WKT 2010 10 26 10 04 55 31.3200 -97.3300 251.000 122.0 143.040 6.280 -999.990 -999.990 1.430 ..P WKT 2010 10 26 10 09 55 31.3200 -97.3300 251.000 457.0 135.909 5.670 -999.990 -999.990 1.359 ..P WKT 2010 10 26 10 19 55 31.3200 -97.3300 251.000 30.0 144.675 5.740 -999.990 -999.990 1.447 ..P WKT 2010 10 26 10 24 55 31.3200 -97.3300 251.000 122.0 140.627 6.090 -999.990 -999.990 1.406 ..P WKT 2010 10 26 10 29 55 31.3200 -97.3300 251.000 457.0 137.945 6.160 -999.990 -999.990 1.379 ..P WKT 2010 10 26 10 34 55 31.3200 -97.3300 251.000 30.0 143.734 6.010 -999.990 -999.990 1.437 ..P WKT 2010 10 26 10 39 55 31.3200 -97.3300 251.000 122.0 145.151 5.880 -999.990 -999.990 1.452 ..P WKT 2010 10 26 10 44 55 31.3200 -97.3300 251.000 457.0 126.344 5.960 -999.990 -999.990 1.263 ..P WKT 2010 10 26 10 54 55 31.3200 -97.3300 251.000 30.0 136.752 6.890 -999.990 -999.990 1.368 ..P WKT 2010 10 26 10 59 55 31.3200 -97.3300 251.000 122.0 131.257 6.160 -999.990 -999.990 1.313 ..P WKT 2010 10 26 11 04 55 31.3200 -97.3300 251.000 457.0 123.575 7.540 -999.990 -999.990 1.236 ..P WKT 2010 10 26 11 09 55 31.3200 -97.3300 251.000 30.0 125.186 6.040 -999.990 -999.990 1.252 ..P WKT 2010 10 26 11 14 55 31.3200 -97.3300 251.000 122.0 112.855 5.770 -999.990 -999.990 1.129 ..P WKT 2010 10 26 11 19 55 31.3200 -97.3300 251.000 457.0 115.560 5.830 -999.990 -999.990 1.156 ..P WKT 2010 10 26 11 29 55 31.3200 -97.3300 251.000 30.0 102.586 6.170 -999.990 -999.990 1.026 ..P WKT 2010 10 26 11 34 55 31.3200 -97.3300 251.000 122.0 110.013 5.900 -999.990 -999.990 1.100 ..P WKT 2010 10 26 11 39 55 31.3200 -97.3300 251.000 457.0 116.757 6.000 -999.990 -999.990 1.168 ..P WKT 2010 10 26 11 44 55 31.3200 -97.3300 251.000 30.0 104.767 5.990 -999.990 -999.990 1.048 ..P WKT 2010 10 26 11 49 55 31.3200 -97.3300 251.000 122.0 109.871 5.840 -999.990 -999.990 1.099 ..P WKT 2010 10 26 12 09 55 31.3200 -97.3300 251.000 457.0 100.349 6.030 -999.990 -999.990 1.003 ..P WKT 2010 10 26 12 10 25 31.3200 -97.3300 251.000 457.0 102.792 6.160 -999.990 -999.990 1.028 ..P WKT 2010 10 26 12 10 55 31.3200 -97.3300 251.000 457.0 105.234 5.880 -999.990 -999.990 1.052 ..P WKT 2010 10 26 12 11 25 31.3200 -97.3300 251.000 457.0 98.378 6.520 -999.990 -999.990 0.984 ..P WKT 2010 10 26 12 11 55 31.3200 -97.3300 251.000 457.0 94.939 5.830 -999.990 -999.990 0.949 ..P WKT 2010 10 26 12 12 25 31.3200 -97.3300 251.000 457.0 97.109 6.080 -999.990 -999.990 0.971 ..P WKT 2010 10 26 12 12 55 31.3200 -97.3300 251.000 457.0 99.004 6.090 -999.990 -999.990 0.990 ..P WKT 2010 10 26 12 13 25 31.3200 -97.3300 251.000 457.0 98.165 5.960 -999.990 -999.990 0.982 ..P WKT 2010 10 26 12 13 55 31.3200 -97.3300 251.000 457.0 100.197 5.980 -999.990 -999.990 1.002 ..P WKT 2010 10 26 12 14 25 31.3200 -97.3300 251.000 457.0 104.145 6.070 -999.990 -999.990 1.041 ..P WKT 2010 10 26 12 14 55 31.3200 -97.3300 251.000 457.0 105.357 6.000 -999.990 -999.990 1.054 ..P WKT 2010 10 26 12 19 55 31.3200 -97.3300 251.000 30.0 99.013 5.920 -999.990 -999.990 0.990 ..P WKT 2010 10 26 12 24 55 31.3200 -97.3300 251.000 122.0 94.447 6.230 -999.990 -999.990 0.944 ..P WKT 2010 10 26 12 29 55 31.3200 -97.3300 251.000 457.0 99.455 5.730 -999.990 -999.990 0.995 ..P WKT 2010 10 26 12 34 55 31.3200 -97.3300 251.000 30.0 95.983 5.750 -999.990 -999.990 0.960 ..P WKT 2010 10 26 12 39 55 31.3200 -97.3300 251.000 122.0 103.177 5.900 -999.990 -999.990 1.032 ..P WKT 2010 10 26 12 44 55 31.3200 -97.3300 251.000 457.0 100.117 5.910 -999.990 -999.990 1.001 ..P WKT 2010 10 26 12 54 55 31.3200 -97.3300 251.000 30.0 101.678 6.030 -999.990 -999.990 1.017 ..P WKT 2010 10 26 12 59 55 31.3200 -97.3300 251.000 122.0 105.205 5.790 -999.990 -999.990 1.052 ..P WKT 2010 10 26 13 04 55 31.3200 -97.3300 251.000 457.0 90.004 6.390 -999.990 -999.990 0.900 ..P WKT 2010 10 26 13 09 55 31.3200 -97.3300 251.000 30.0 101.597 6.100 -999.990 -999.990 1.016 ..P WKT 2010 10 26 13 14 55 31.3200 -97.3300 251.000 122.0 103.758 6.380 -999.990 -999.990 1.038 ..P WKT 2010 10 26 13 19 55 31.3200 -97.3300 251.000 457.0 96.896 6.640 -999.990 -999.990 0.969 ..P WKT 2010 10 26 13 29 55 31.3200 -97.3300 251.000 30.0 100.494 6.440 -999.990 -999.990 1.005 ..P WKT 2010 10 26 13 34 55 31.3200 -97.3300 251.000 122.0 100.291 6.900 -999.990 -999.990 1.003 ..P WKT 2010 10 26 13 39 55 31.3200 -97.3300 251.000 457.0 92.162 6.720 -999.990 -999.990 0.922 ..P WKT 2010 10 26 13 44 55 31.3200 -97.3300 251.000 30.0 103.440 6.780 -999.990 -999.990 1.034 ..P WKT 2010 10 26 13 49 55 31.3200 -97.3300 251.000 122.0 107.063 6.950 -999.990 -999.990 1.071 ..P WKT 2010 10 26 13 54 55 31.3200 -97.3300 251.000 457.0 101.667 6.970 -999.990 -999.990 1.017 ..P WKT 2010 10 26 14 04 55 31.3200 -97.3300 251.000 30.0 108.876 7.140 -999.990 -999.990 1.089 ..P WKT 2010 10 26 14 09 55 31.3200 -97.3300 251.000 122.0 105.901 6.610 -999.990 -999.990 1.059 ..P WKT 2010 10 26 14 14 55 31.3200 -97.3300 251.000 457.0 93.635 6.350 -999.990 -999.990 0.936 ..P WKT 2010 10 26 14 19 55 31.3200 -97.3300 251.000 30.0 95.581 6.060 -999.990 -999.990 0.956 ..P WKT 2010 10 26 14 24 55 31.3200 -97.3300 251.000 122.0 104.630 5.820 -999.990 -999.990 1.046 ..P WKT 2010 10 26 14 29 55 31.3200 -97.3300 251.000 457.0 95.645 6.040 -999.990 -999.990 0.956 ..P WKT 2010 10 26 14 39 55 31.3200 -97.3300 251.000 30.0 105.272 6.080 -999.990 -999.990 1.053 ..P WKT 2010 10 26 14 44 55 31.3200 -97.3300 251.000 122.0 98.473 8.090 -999.990 -999.990 0.985 ..P WKT 2010 10 26 14 49 55 31.3200 -97.3300 251.000 457.0 92.767 5.780 -999.990 -999.990 0.928 ..P WKT 2010 10 26 14 54 55 31.3200 -97.3300 251.000 30.0 104.274 5.770 -999.990 -999.990 1.043 ..P WKT 2010 10 26 14 59 55 31.3200 -97.3300 251.000 122.0 99.934 5.760 -999.990 -999.990 0.999 ..P WKT 2010 10 26 15 04 55 31.3200 -97.3300 251.000 457.0 95.595 7.640 -999.990 -999.990 0.956 ..P WKT 2010 10 26 15 14 55 31.3200 -97.3300 251.000 30.0 96.615 6.190 -999.990 -999.990 0.966 ..P WKT 2010 10 26 15 19 55 31.3200 -97.3300 251.000 122.0 91.320 6.240 -999.990 -999.990 0.913 ..P WKT 2010 10 26 15 24 55 31.3200 -97.3300 251.000 457.0 94.221 6.060 -999.990 -999.990 0.942 ..P WKT 2010 10 26 15 29 55 31.3200 -97.3300 251.000 30.0 96.848 6.190 -999.990 -999.990 0.968 ..P WKT 2010 10 26 15 34 55 31.3200 -97.3300 251.000 122.0 95.377 6.410 -999.990 -999.990 0.954 ..P WKT 2010 10 26 15 39 55 31.3200 -97.3300 251.000 457.0 98.277 6.660 -999.990 -999.990 0.983 ..P WKT 2010 10 26 15 49 55 31.3200 -97.3300 251.000 30.0 100.974 6.530 -999.990 -999.990 1.010 ..P WKT 2010 10 26 15 54 55 31.3200 -97.3300 251.000 122.0 102.410 6.470 -999.990 -999.990 1.024 ..P WKT 2010 10 26 15 59 55 31.3200 -97.3300 251.000 457.0 101.525 6.510 -999.990 -999.990 1.015 ..P WKT 2010 10 26 16 04 55 31.3200 -97.3300 251.000 30.0 95.862 6.240 -999.990 -999.990 0.959 ..P WKT 2010 10 26 16 09 55 31.3200 -97.3300 251.000 122.0 99.755 6.710 -999.990 -999.990 0.998 ..P WKT 2010 10 26 16 14 55 31.3200 -97.3300 251.000 457.0 100.918 6.410 -999.990 -999.990 1.009 ..P WKT 2010 10 26 16 24 55 31.3200 -97.3300 251.000 30.0 104.629 7.480 -999.990 -999.990 1.046 ..P WKT 2010 10 26 16 29 55 31.3200 -97.3300 251.000 122.0 101.033 6.200 -999.990 -999.990 1.010 ..P WKT 2010 10 26 16 34 55 31.3200 -97.3300 251.000 457.0 103.990 6.100 -999.990 -999.990 1.040 ..P WKT 2010 10 26 16 39 55 31.3200 -97.3300 251.000 30.0 104.217 6.320 -999.990 -999.990 1.042 ..P WKT 2010 10 26 16 44 55 31.3200 -97.3300 251.000 122.0 106.627 6.300 -999.990 -999.990 1.066 ..P WKT 2010 10 26 16 49 55 31.3200 -97.3300 251.000 457.0 104.670 6.490 -999.990 -999.990 1.047 ..P WKT 2010 10 26 17 04 55 31.3200 -97.3300 251.000 30.0 100.549 6.250 -999.990 -999.990 1.005 ..P WKT 2010 10 26 17 09 55 31.3200 -97.3300 251.000 122.0 100.218 6.010 -999.990 -999.990 1.002 ..P WKT 2010 10 26 17 14 55 31.3200 -97.3300 251.000 457.0 105.208 5.930 -999.990 -999.990 1.052 ..P WKT 2010 10 26 17 19 55 31.3200 -97.3300 251.000 30.0 99.009 5.950 -999.990 -999.990 0.990 ..P WKT 2010 10 26 17 24 55 31.3200 -97.3300 251.000 122.0 105.910 6.740 -999.990 -999.990 1.059 ..P WKT 2010 10 26 17 29 55 31.3200 -97.3300 251.000 457.0 102.304 6.520 -999.990 -999.990 1.023 ..P WKT 2010 10 26 17 39 55 31.3200 -97.3300 251.000 30.0 105.240 5.900 -999.990 -999.990 1.052 ..P WKT 2010 10 26 17 44 55 31.3200 -97.3300 251.000 122.0 101.412 6.040 -999.990 -999.990 1.014 ..P WKT 2010 10 26 17 49 55 31.3200 -97.3300 251.000 457.0 109.590 6.330 -999.990 -999.990 1.096 ..P WKT 2010 10 26 17 54 55 31.3200 -97.3300 251.000 30.0 106.581 6.440 -999.990 -999.990 1.066 ..P WKT 2010 10 26 17 59 55 31.3200 -97.3300 251.000 122.0 106.029 6.750 -999.990 -999.990 1.060 ..P WKT 2010 10 26 18 04 55 31.3200 -97.3300 251.000 457.0 104.930 5.820 -999.990 -999.990 1.049 ..P WKT 2010 10 26 18 14 55 31.3200 -97.3300 251.000 30.0 109.124 6.590 -999.990 -999.990 1.091 ..P WKT 2010 10 26 18 19 55 31.3200 -97.3300 251.000 122.0 112.507 6.520 -999.990 -999.990 1.125 ..P WKT 2010 10 26 18 24 55 31.3200 -97.3300 251.000 457.0 106.069 6.790 -999.990 -999.990 1.061 ..P WKT 2010 10 26 18 29 55 31.3200 -97.3300 251.000 30.0 108.906 6.130 -999.990 -999.990 1.089 ..P WKT 2010 10 26 18 34 55 31.3200 -97.3300 251.000 122.0 109.015 6.010 -999.990 -999.990 1.090 ..P WKT 2010 10 26 18 39 55 31.3200 -97.3300 251.000 457.0 103.670 6.470 -999.990 -999.990 1.037 ..P WKT 2010 10 26 18 49 55 31.3200 -97.3300 251.000 30.0 108.447 5.790 -999.990 -999.990 1.084 ..P WKT 2010 10 26 18 54 55 31.3200 -97.3300 251.000 122.0 109.843 5.910 -999.990 -999.990 1.098 ..P WKT 2010 10 26 18 59 55 31.3200 -97.3300 251.000 457.0 105.238 6.160 -999.990 -999.990 1.052 ..P WKT 2010 10 26 19 04 55 31.3200 -97.3300 251.000 30.0 104.179 5.800 -999.990 -999.990 1.042 ..P WKT 2010 10 26 19 09 55 31.3200 -97.3300 251.000 122.0 106.665 5.920 -999.990 -999.990 1.067 ..P WKT 2010 10 26 19 14 55 31.3200 -97.3300 251.000 457.0 104.787 5.980 -999.990 -999.990 1.048 ..P WKT 2010 10 26 19 24 55 31.3200 -97.3300 251.000 30.0 107.188 6.510 -999.990 -999.990 1.072 ..P WKT 2010 10 26 19 29 55 31.3200 -97.3300 251.000 122.0 109.829 6.060 -999.990 -999.990 1.098 ..P WKT 2010 10 26 19 34 55 31.3200 -97.3300 251.000 457.0 105.790 6.220 -999.990 -999.990 1.058 ..P WKT 2010 10 26 19 39 55 31.3200 -97.3300 251.000 30.0 108.976 7.050 -999.990 -999.990 1.090 ..P WKT 2010 10 26 19 44 55 31.3200 -97.3300 251.000 122.0 107.119 6.010 -999.990 -999.990 1.071 ..P WKT 2010 10 26 19 49 55 31.3200 -97.3300 251.000 457.0 112.213 6.090 -999.990 -999.990 1.122 ..P WKT 2010 10 26 19 59 55 31.3200 -97.3300 251.000 30.0 104.176 6.630 -999.990 -999.990 1.042 ..P WKT 2010 10 26 20 04 55 31.3200 -97.3300 251.000 122.0 100.995 6.260 -999.990 -999.990 1.010 ..P WKT 2010 10 26 20 09 55 31.3200 -97.3300 251.000 457.0 105.855 6.730 -999.990 -999.990 1.059 ..P WKT 2010 10 26 20 14 55 31.3200 -97.3300 251.000 30.0 105.264 6.480 -999.990 -999.990 1.053 ..P WKT 2010 10 26 20 19 55 31.3200 -97.3300 251.000 122.0 108.079 6.560 -999.990 -999.990 1.081 ..P WKT 2010 10 26 20 24 55 31.3200 -97.3300 251.000 457.0 100.401 6.880 -999.990 -999.990 1.004 ..P WKT 2010 10 26 20 34 55 31.3200 -97.3300 251.000 30.0 101.477 7.420 -999.990 -999.990 1.015 ..P WKT 2010 10 26 20 39 55 31.3200 -97.3300 251.000 122.0 102.463 6.860 -999.990 -999.990 1.025 ..P WKT 2010 10 26 20 44 55 31.3200 -97.3300 251.000 457.0 103.448 7.050 -999.990 -999.990 1.034 ..P WKT 2010 10 26 20 49 55 31.3200 -97.3300 251.000 30.0 106.613 6.920 -999.990 -999.990 1.066 ..P WKT 2010 10 26 20 54 55 31.3200 -97.3300 251.000 122.0 107.734 7.020 -999.990 -999.990 1.077 ..P WKT 2010 10 26 20 59 55 31.3200 -97.3300 251.000 457.0 107.221 6.670 -999.990 -999.990 1.072 ..P WKT 2010 10 26 21 09 55 31.3200 -97.3300 251.000 30.0 101.602 6.610 -999.990 -999.990 1.016 ..P WKT 2010 10 26 21 14 55 31.3200 -97.3300 251.000 122.0 102.217 6.630 -999.990 -999.990 1.022 ..P WKT 2010 10 26 21 19 55 31.3200 -97.3300 251.000 457.0 108.690 6.860 -999.990 -999.990 1.087 ..P WKT 2010 10 26 21 24 55 31.3200 -97.3300 251.000 30.0 103.993 6.650 -999.990 -999.990 1.040 ..P WKT 2010 10 26 21 29 55 31.3200 -97.3300 251.000 122.0 108.559 6.380 -999.990 -999.990 1.086 ..P WKT 2010 10 26 21 34 55 31.3200 -97.3300 251.000 457.0 105.769 6.490 -999.990 -999.990 1.058 ..P WKT 2010 10 26 21 44 55 31.3200 -97.3300 251.000 30.0 106.007 6.800 -999.990 -999.990 1.060 ..P WKT 2010 10 26 21 49 55 31.3200 -97.3300 251.000 122.0 102.497 6.390 -999.990 -999.990 1.025 ..P WKT 2010 10 26 21 54 55 31.3200 -97.3300 251.000 457.0 109.610 6.310 -999.990 -999.990 1.096 ..P WKT 2010 10 26 21 59 55 31.3200 -97.3300 251.000 30.0 108.008 6.340 -999.990 -999.990 1.080 ..P WKT 2010 10 26 22 04 55 31.3200 -97.3300 251.000 122.0 102.592 6.160 -999.990 -999.990 1.026 ..P WKT 2010 10 26 22 09 55 31.3200 -97.3300 251.000 457.0 103.441 5.990 -999.990 -999.990 1.034 ..P WKT 2010 10 26 22 19 55 31.3200 -97.3300 251.000 30.0 104.165 5.940 -999.990 -999.990 1.042 ..P WKT 2010 10 26 22 24 55 31.3200 -97.3300 251.000 122.0 105.947 6.450 -999.990 -999.990 1.059 ..P WKT 2010 10 26 22 29 55 31.3200 -97.3300 251.000 457.0 109.907 6.710 -999.990 -999.990 1.099 ..P WKT 2010 10 26 22 34 55 31.3200 -97.3300 251.000 30.0 102.704 6.370 -999.990 -999.990 1.027 ..P WKT 2010 10 26 22 39 55 31.3200 -97.3300 251.000 122.0 120.006 6.850 -999.990 -999.990 1.200 ..P WKT 2010 10 26 22 44 55 31.3200 -97.3300 251.000 457.0 117.975 6.670 -999.990 -999.990 1.180 ..P WKT 2010 10 26 22 54 55 31.3200 -97.3300 251.000 30.0 106.641 7.160 -999.990 -999.990 1.066 ..P WKT 2010 10 26 22 59 55 31.3200 -97.3300 251.000 122.0 113.129 6.580 -999.990 -999.990 1.131 ..P WKT 2010 10 26 23 04 55 31.3200 -97.3300 251.000 457.0 110.632 6.580 -999.990 -999.990 1.106 ..P WKT 2010 10 26 23 09 55 31.3200 -97.3300 251.000 30.0 104.597 6.770 -999.990 -999.990 1.046 ..P WKT 2010 10 26 23 14 55 31.3200 -97.3300 251.000 122.0 107.546 6.530 -999.990 -999.990 1.075 ..P WKT 2010 10 26 23 19 55 31.3200 -97.3300 251.000 457.0 99.877 6.580 -999.990 -999.990 0.999 ..P WKT 2010 10 26 23 29 55 31.3200 -97.3300 251.000 30.0 109.351 6.420 -999.990 -999.990 1.094 ..P WKT 2010 10 26 23 34 55 31.3200 -97.3300 251.000 122.0 106.077 6.670 -999.990 -999.990 1.061 ..P WKT 2010 10 26 23 39 55 31.3200 -97.3300 251.000 457.0 107.839 7.300 -999.990 -999.990 1.078 ..P WKT 2010 10 26 23 44 55 31.3200 -97.3300 251.000 30.0 215.464 25.690 -999.990 -999.990 2.155 ..P WKT 2010 10 26 23 49 55 31.3200 -97.3300 251.000 122.0 107.688 7.320 -999.990 -999.990 1.077 ..P WKT 2010 10 27 00 09 55 31.3200 -97.3300 251.000 457.0 113.043 7.880 -999.990 -999.990 1.130 ..P WKT 2010 10 27 00 10 25 31.3200 -97.3300 251.000 457.0 111.604 7.650 -999.990 -999.990 1.116 ..P WKT 2010 10 27 00 10 55 31.3200 -97.3300 251.000 457.0 116.970 7.940 -999.990 -999.990 1.170 ..P WKT 2010 10 27 00 11 25 31.3200 -97.3300 251.000 457.0 115.804 7.740 -999.990 -999.990 1.158 ..P WKT 2010 10 27 00 11 55 31.3200 -97.3300 251.000 457.0 115.182 7.650 -999.990 -999.990 1.152 ..P WKT 2010 10 27 00 12 25 31.3200 -97.3300 251.000 457.0 120.412 8.090 -999.990 -999.990 1.204 ..P WKT 2010 10 27 00 12 55 31.3200 -97.3300 251.000 457.0 117.069 8.860 -999.990 -999.990 1.171 ..P WKT 2010 10 27 00 13 25 31.3200 -97.3300 251.000 457.0 115.358 8.470 -999.990 -999.990 1.154 ..P WKT 2010 10 27 00 13 55 31.3200 -97.3300 251.000 457.0 119.363 8.110 -999.990 -999.990 1.194 ..P WKT 2010 10 27 00 14 25 31.3200 -97.3300 251.000 457.0 112.618 8.040 -999.990 -999.990 1.126 ..P WKT 2010 10 27 00 14 55 31.3200 -97.3300 251.000 457.0 113.493 7.880 -999.990 -999.990 1.135 ..P WKT 2010 10 27 00 19 55 31.3200 -97.3300 251.000 30.0 186.210 17.730 -999.990 -999.990 1.862 ..P WKT 2010 10 27 00 24 55 31.3200 -97.3300 251.000 122.0 110.582 7.080 -999.990 -999.990 1.106 ..P WKT 2010 10 27 00 29 55 31.3200 -97.3300 251.000 457.0 109.944 6.990 -999.990 -999.990 1.099 ..P WKT 2010 10 27 00 34 55 31.3200 -97.3300 251.000 30.0 108.352 7.430 -999.990 -999.990 1.084 ..P WKT 2010 10 27 00 39 55 31.3200 -97.3300 251.000 122.0 113.023 6.580 -999.990 -999.990 1.130 ..P WKT 2010 10 27 00 44 55 31.3200 -97.3300 251.000 457.0 113.882 6.690 -999.990 -999.990 1.139 ..P WKT 2010 10 27 00 54 55 31.3200 -97.3300 251.000 30.0 105.473 6.330 -999.990 -999.990 1.055 ..P WKT 2010 10 27 00 59 55 31.3200 -97.3300 251.000 122.0 109.550 6.180 -999.990 -999.990 1.095 ..P WKT 2010 10 27 01 04 55 31.3200 -97.3300 251.000 457.0 103.959 6.510 -999.990 -999.990 1.040 ..P WKT 2010 10 27 01 09 55 31.3200 -97.3300 251.000 30.0 109.126 6.240 -999.990 -999.990 1.091 ..P WKT 2010 10 27 01 14 55 31.3200 -97.3300 251.000 122.0 120.151 6.320 -999.990 -999.990 1.202 ..P WKT 2010 10 27 01 19 55 31.3200 -97.3300 251.000 457.0 103.662 6.330 -999.990 -999.990 1.037 ..P WKT 2010 10 27 01 29 55 31.3200 -97.3300 251.000 30.0 111.547 6.240 -999.990 -999.990 1.115 ..P WKT 2010 10 27 01 34 55 31.3200 -97.3300 251.000 122.0 117.670 6.240 -999.990 -999.990 1.177 ..P WKT 2010 10 27 01 39 55 31.3200 -97.3300 251.000 457.0 100.085 6.160 -999.990 -999.990 1.001 ..P WKT 2010 10 27 01 44 55 31.3200 -97.3300 251.000 30.0 112.750 6.150 -999.990 -999.990 1.127 ..P WKT 2010 10 27 01 49 55 31.3200 -97.3300 251.000 122.0 112.061 6.190 -999.990 -999.990 1.121 ..P WKT 2010 10 27 01 54 55 31.3200 -97.3300 251.000 457.0 104.284 6.660 -999.990 -999.990 1.043 ..P WKT 2010 10 27 02 04 55 31.3200 -97.3300 251.000 30.0 103.255 5.970 -999.990 -999.990 1.033 ..P WKT 2010 10 27 02 09 55 31.3200 -97.3300 251.000 122.0 102.097 6.010 -999.990 -999.990 1.021 ..P WKT 2010 10 27 02 14 55 31.3200 -97.3300 251.000 457.0 100.667 6.450 -999.990 -999.990 1.007 ..P WKT 2010 10 27 02 19 55 31.3200 -97.3300 251.000 30.0 110.963 6.190 -999.990 -999.990 1.110 ..P WKT 2010 10 27 02 24 55 31.3200 -97.3300 251.000 122.0 104.897 6.220 -999.990 -999.990 1.049 ..P WKT 2010 10 27 02 29 55 31.3200 -97.3300 251.000 457.0 99.648 5.900 -999.990 -999.990 0.996 ..P WKT 2010 10 27 02 39 55 31.3200 -97.3300 251.000 30.0 115.529 6.900 -999.990 -999.990 1.155 ..P WKT 2010 10 27 02 44 55 31.3200 -97.3300 251.000 122.0 103.928 6.230 -999.990 -999.990 1.039 ..P WKT 2010 10 27 02 49 55 31.3200 -97.3300 251.000 457.0 102.146 6.310 -999.990 -999.990 1.021 ..P WKT 2010 10 27 02 54 55 31.3200 -97.3300 251.000 30.0 103.911 6.010 -999.990 -999.990 1.039 ..P WKT 2010 10 27 02 59 55 31.3200 -97.3300 251.000 122.0 104.039 6.010 -999.990 -999.990 1.040 ..P WKT 2010 10 27 03 04 55 31.3200 -97.3300 251.000 457.0 91.342 6.000 -999.990 -999.990 0.913 ..P WKT 2010 10 27 03 14 55 31.3200 -97.3300 251.000 30.0 100.232 6.750 -999.990 -999.990 1.002 ..P WKT 2010 10 27 03 19 55 31.3200 -97.3300 251.000 122.0 104.902 6.040 -999.990 -999.990 1.049 ..P WKT 2010 10 27 03 24 55 31.3200 -97.3300 251.000 457.0 100.156 6.920 -999.990 -999.990 1.002 ..P WKT 2010 10 27 03 29 55 31.3200 -97.3300 251.000 30.0 111.925 6.360 -999.990 -999.990 1.119 ..P WKT 2010 10 27 03 34 55 31.3200 -97.3300 251.000 122.0 94.893 6.190 -999.990 -999.990 0.949 ..P WKT 2010 10 27 03 39 55 31.3200 -97.3300 251.000 457.0 95.060 6.890 -999.990 -999.990 0.951 ..P WKT 2010 10 27 03 49 55 31.3200 -97.3300 251.000 30.0 108.422 6.250 -999.990 -999.990 1.084 ..P WKT 2010 10 27 03 54 55 31.3200 -97.3300 251.000 122.0 101.411 6.140 -999.990 -999.990 1.014 ..P WKT 2010 10 27 03 59 55 31.3200 -97.3300 251.000 457.0 95.355 6.610 -999.990 -999.990 0.954 ..P WKT 2010 10 27 04 04 55 31.3200 -97.3300 251.000 30.0 115.381 6.260 -999.990 -999.990 1.154 ..P WKT 2010 10 27 04 09 55 31.3200 -97.3300 251.000 122.0 110.009 6.320 -999.990 -999.990 1.100 ..P WKT 2010 10 27 04 14 55 31.3200 -97.3300 251.000 457.0 99.445 6.000 -999.990 -999.990 0.994 ..P WKT 2010 10 27 04 24 55 31.3200 -97.3300 251.000 30.0 107.018 6.040 -999.990 -999.990 1.070 ..P WKT 2010 10 27 04 29 55 31.3200 -97.3300 251.000 122.0 109.450 7.170 -999.990 -999.990 1.095 ..P WKT 2010 10 27 04 34 55 31.3200 -97.3300 251.000 457.0 98.902 7.640 -999.990 -999.990 0.989 ..P WKT 2010 10 27 04 39 55 31.3200 -97.3300 251.000 30.0 105.979 6.280 -999.990 -999.990 1.060 ..P WKT 2010 10 27 04 44 55 31.3200 -97.3300 251.000 122.0 112.646 6.440 -999.990 -999.990 1.126 ..P WKT 2010 10 27 04 49 55 31.3200 -97.3300 251.000 457.0 97.724 6.570 -999.990 -999.990 0.977 ..P WKT 2010 10 27 05 04 55 31.3200 -97.3300 251.000 30.0 107.251 5.980 -999.990 -999.990 1.073 ..P WKT 2010 10 27 05 09 55 31.3200 -97.3300 251.000 122.0 96.104 5.980 -999.990 -999.990 0.961 ..P WKT 2010 10 27 05 14 55 31.3200 -97.3300 251.000 457.0 93.432 6.400 -999.990 -999.990 0.934 ..P WKT 2010 10 27 05 19 55 31.3200 -97.3300 251.000 30.0 107.712 6.560 -999.990 -999.990 1.077 ..P WKT 2010 10 27 05 24 55 31.3200 -97.3300 251.000 122.0 100.938 6.220 -999.990 -999.990 1.009 ..P WKT 2010 10 27 05 29 55 31.3200 -97.3300 251.000 457.0 90.881 5.810 -999.990 -999.990 0.909 ..P WKT 2010 10 27 05 39 55 31.3200 -97.3300 251.000 30.0 103.379 6.110 -999.990 -999.990 1.034 ..P WKT 2010 10 27 05 44 55 31.3200 -97.3300 251.000 122.0 105.969 5.930 -999.990 -999.990 1.060 ..P WKT 2010 10 27 05 49 55 31.3200 -97.3300 251.000 457.0 91.599 5.930 -999.990 -999.990 0.916 ..P WKT 2010 10 27 05 54 55 31.3200 -97.3300 251.000 30.0 108.962 5.960 -999.990 -999.990 1.090 ..P WKT 2010 10 27 05 59 55 31.3200 -97.3300 251.000 122.0 108.270 6.220 -999.990 -999.990 1.083 ..P WKT 2010 10 27 06 04 55 31.3200 -97.3300 251.000 457.0 99.095 7.510 -999.990 -999.990 0.991 ..P WKT 2010 10 27 06 14 55 31.3200 -97.3300 251.000 30.0 112.761 6.600 -999.990 -999.990 1.128 ..P WKT 2010 10 27 06 19 55 31.3200 -97.3300 251.000 122.0 109.059 6.150 -999.990 -999.990 1.091 ..P WKT 2010 10 27 06 24 55 31.3200 -97.3300 251.000 457.0 95.502 6.010 -999.990 -999.990 0.955 ..P WKT 2010 10 27 06 29 55 31.3200 -97.3300 251.000 30.0 109.864 6.320 -999.990 -999.990 1.099 ..P WKT 2010 10 27 06 34 55 31.3200 -97.3300 251.000 122.0 102.054 6.770 -999.990 -999.990 1.021 ..P WKT 2010 10 27 06 39 55 31.3200 -97.3300 251.000 457.0 96.160 6.170 -999.990 -999.990 0.962 ..P WKT 2010 10 27 06 49 55 31.3200 -97.3300 251.000 30.0 117.773 5.980 -999.990 -999.990 1.178 ..P WKT 2010 10 27 06 54 55 31.3200 -97.3300 251.000 122.0 109.961 6.040 -999.990 -999.990 1.100 ..P WKT 2010 10 27 06 59 55 31.3200 -97.3300 251.000 457.0 91.194 6.160 -999.990 -999.990 0.912 ..P WKT 2010 10 27 07 04 55 31.3200 -97.3300 251.000 30.0 114.875 6.560 -999.990 -999.990 1.149 ..P WKT 2010 10 27 07 09 55 31.3200 -97.3300 251.000 122.0 125.686 7.240 -999.990 -999.990 1.257 ..P WKT 2010 10 27 07 14 55 31.3200 -97.3300 251.000 457.0 95.960 7.180 -999.990 -999.990 0.960 ..P WKT 2010 10 27 07 24 55 31.3200 -97.3300 251.000 30.0 117.290 6.700 -999.990 -999.990 1.173 ..P WKT 2010 10 27 07 29 55 31.3200 -97.3300 251.000 122.0 103.565 6.420 -999.990 -999.990 1.036 ..P WKT 2010 10 27 07 34 55 31.3200 -97.3300 251.000 457.0 102.029 6.110 -999.990 -999.990 1.020 ..P WKT 2010 10 27 07 39 55 31.3200 -97.3300 251.000 30.0 115.018 6.290 -999.990 -999.990 1.150 ..P WKT 2010 10 27 07 44 55 31.3200 -97.3300 251.000 122.0 107.180 6.350 -999.990 -999.990 1.072 ..P WKT 2010 10 27 07 49 55 31.3200 -97.3300 251.000 457.0 101.122 5.900 -999.990 -999.990 1.011 ..P WKT 2010 10 27 07 59 55 31.3200 -97.3300 251.000 30.0 114.262 6.190 -999.990 -999.990 1.143 ..P WKT 2010 10 27 08 04 55 31.3200 -97.3300 251.000 122.0 131.545 5.930 -999.990 -999.990 1.315 ..P WKT 2010 10 27 08 09 55 31.3200 -97.3300 251.000 457.0 100.442 6.060 -999.990 -999.990 1.004 ..P WKT 2010 10 27 08 14 55 31.3200 -97.3300 251.000 30.0 109.501 6.080 -999.990 -999.990 1.095 ..P WKT 2010 10 27 08 19 55 31.3200 -97.3300 251.000 122.0 109.923 6.840 -999.990 -999.990 1.099 ..P WKT 2010 10 27 08 24 55 31.3200 -97.3300 251.000 457.0 99.515 6.230 -999.990 -999.990 0.995 ..P WKT 2010 10 27 08 34 55 31.3200 -97.3300 251.000 30.0 124.063 6.320 -999.990 -999.990 1.241 ..P WKT 2010 10 27 08 39 55 31.3200 -97.3300 251.000 122.0 111.027 6.140 -999.990 -999.990 1.110 ..P WKT 2010 10 27 08 44 55 31.3200 -97.3300 251.000 457.0 108.002 6.170 -999.990 -999.990 1.080 ..P WKT 2010 10 27 08 49 55 31.3200 -97.3300 251.000 30.0 121.162 6.350 -999.990 -999.990 1.212 ..P WKT 2010 10 27 08 54 55 31.3200 -97.3300 251.000 122.0 136.105 5.860 -999.990 -999.990 1.361 ..P WKT 2010 10 27 08 59 55 31.3200 -97.3300 251.000 457.0 103.314 6.350 -999.990 -999.990 1.033 ..P WKT 2010 10 27 09 09 55 31.3200 -97.3300 251.000 30.0 111.294 5.840 -999.990 -999.990 1.113 ..P WKT 2010 10 27 09 14 55 31.3200 -97.3300 251.000 122.0 118.322 6.170 -999.990 -999.990 1.183 ..P WKT 2010 10 27 09 19 55 31.3200 -97.3300 251.000 457.0 110.807 6.220 -999.990 -999.990 1.108 ..P WKT 2010 10 27 09 24 55 31.3200 -97.3300 251.000 30.0 113.721 6.940 -999.990 -999.990 1.137 ..P WKT 2010 10 27 09 29 55 31.3200 -97.3300 251.000 122.0 114.712 6.900 -999.990 -999.990 1.147 ..P WKT 2010 10 27 09 34 55 31.3200 -97.3300 251.000 457.0 112.411 8.090 -999.990 -999.990 1.124 ..P WKT 2010 10 27 09 44 55 31.3200 -97.3300 251.000 30.0 119.965 7.070 -999.990 -999.990 1.200 ..P WKT 2010 10 27 09 49 55 31.3200 -97.3300 251.000 122.0 116.918 6.780 -999.990 -999.990 1.169 ..P WKT 2010 10 27 09 54 55 31.3200 -97.3300 251.000 457.0 117.166 6.780 -999.990 -999.990 1.172 ..P WKT 2010 10 27 09 59 55 31.3200 -97.3300 251.000 30.0 120.709 6.940 -999.990 -999.990 1.207 ..P WKT 2010 10 27 10 04 55 31.3200 -97.3300 251.000 122.0 109.147 6.450 -999.990 -999.990 1.091 ..P WKT 2010 10 27 10 09 55 31.3200 -97.3300 251.000 457.0 114.887 5.920 -999.990 -999.990 1.149 ..P WKT 2010 10 27 10 19 55 31.3200 -97.3300 251.000 30.0 118.954 6.100 -999.990 -999.990 1.190 ..P WKT 2010 10 27 10 24 55 31.3200 -97.3300 251.000 122.0 117.553 6.090 -999.990 -999.990 1.176 ..P WKT 2010 10 27 10 29 55 31.3200 -97.3300 251.000 457.0 117.526 5.790 -999.990 -999.990 1.175 ..P WKT 2010 10 27 10 34 55 31.3200 -97.3300 251.000 30.0 119.422 5.840 -999.990 -999.990 1.194 ..P WKT 2010 10 27 10 39 55 31.3200 -97.3300 251.000 122.0 118.845 6.220 -999.990 -999.990 1.188 ..P WKT 2010 10 27 10 44 55 31.3200 -97.3300 251.000 457.0 120.742 6.660 -999.990 -999.990 1.207 ..P WKT 2010 10 27 10 54 55 31.3200 -97.3300 251.000 30.0 114.858 5.940 -999.990 -999.990 1.149 ..P WKT 2010 10 27 10 59 55 31.3200 -97.3300 251.000 122.0 113.673 5.930 -999.990 -999.990 1.137 ..P WKT 2010 10 27 11 04 55 31.3200 -97.3300 251.000 457.0 120.871 6.070 -999.990 -999.990 1.209 ..P WKT 2010 10 27 11 09 55 31.3200 -97.3300 251.000 30.0 121.335 6.060 -999.990 -999.990 1.213 ..P WKT 2010 10 27 11 14 55 31.3200 -97.3300 251.000 122.0 120.562 6.030 -999.990 -999.990 1.206 ..P WKT 2010 10 27 11 19 55 31.3200 -97.3300 251.000 457.0 121.989 6.270 -999.990 -999.990 1.220 ..P WKT 2010 10 27 11 29 55 31.3200 -97.3300 251.000 30.0 116.536 5.950 -999.990 -999.990 1.165 ..P WKT 2010 10 27 11 34 55 31.3200 -97.3300 251.000 122.0 122.581 6.250 -999.990 -999.990 1.226 ..P WKT 2010 10 27 11 39 55 31.3200 -97.3300 251.000 457.0 159.018 5.670 -999.990 -999.990 1.590 ..P WKT 2010 10 27 11 44 55 31.3200 -97.3300 251.000 30.0 119.134 6.150 -999.990 -999.990 1.191 ..P WKT 2010 10 27 11 49 55 31.3200 -97.3300 251.000 122.0 131.370 6.110 -999.990 -999.990 1.314 ..P WKT 2010 10 27 12 09 55 31.3200 -97.3300 251.000 457.0 155.594 6.030 -999.990 -999.990 1.556 ..P WKT 2010 10 27 12 10 25 31.3200 -97.3300 251.000 457.0 150.209 5.740 -999.990 -999.990 1.502 ..P WKT 2010 10 27 12 10 55 31.3200 -97.3300 251.000 457.0 152.937 6.030 -999.990 -999.990 1.529 ..P WKT 2010 10 27 12 11 25 31.3200 -97.3300 251.000 457.0 146.591 5.960 -999.990 -999.990 1.466 ..P WKT 2010 10 27 12 11 55 31.3200 -97.3300 251.000 457.0 151.382 5.810 -999.990 -999.990 1.514 ..P WKT 2010 10 27 12 12 25 31.3200 -97.3300 251.000 457.0 147.373 5.630 -999.990 -999.990 1.474 ..P WKT 2010 10 27 12 12 55 31.3200 -97.3300 251.000 457.0 142.539 5.970 -999.990 -999.990 1.425 ..P WKT 2010 10 27 12 13 25 31.3200 -97.3300 251.000 457.0 150.080 6.690 -999.990 -999.990 1.501 ..P WKT 2010 10 27 12 13 55 31.3200 -97.3300 251.000 457.0 150.333 5.900 -999.990 -999.990 1.503 ..P WKT 2010 10 27 12 14 25 31.3200 -97.3300 251.000 457.0 151.411 5.820 -999.990 -999.990 1.514 ..P WKT 2010 10 27 12 14 55 31.3200 -97.3300 251.000 457.0 147.128 7.240 -999.990 -999.990 1.471 ..P WKT 2010 10 27 12 19 55 31.3200 -97.3300 251.000 30.0 115.575 5.880 -999.990 -999.990 1.156 ..P WKT 2010 10 27 12 24 55 31.3200 -97.3300 251.000 122.0 117.015 6.050 -999.990 -999.990 1.170 ..P WKT 2010 10 27 12 29 55 31.3200 -97.3300 251.000 457.0 127.522 5.640 -999.990 -999.990 1.275 ..P WKT 2010 10 27 12 34 55 31.3200 -97.3300 251.000 30.0 121.266 5.550 -999.990 -999.990 1.213 ..P WKT 2010 10 27 12 39 55 31.3200 -97.3300 251.000 122.0 117.211 6.160 -999.990 -999.990 1.172 ..P WKT 2010 10 27 12 44 55 31.3200 -97.3300 251.000 457.0 118.787 7.080 -999.990 -999.990 1.188 ..P WKT 2010 10 27 12 54 55 31.3200 -97.3300 251.000 30.0 135.900 5.830 -999.990 -999.990 1.359 ..P WKT 2010 10 27 12 59 55 31.3200 -97.3300 251.000 122.0 128.514 5.610 -999.990 -999.990 1.285 ..P WKT 2010 10 27 13 04 55 31.3200 -97.3300 251.000 457.0 116.192 6.210 -999.990 -999.990 1.162 ..P WKT 2010 10 27 13 09 55 31.3200 -97.3300 251.000 30.0 136.934 6.480 -999.990 -999.990 1.369 ..P WKT 2010 10 27 13 14 55 31.3200 -97.3300 251.000 122.0 125.576 5.480 -999.990 -999.990 1.256 ..P WKT 2010 10 27 13 19 55 31.3200 -97.3300 251.000 457.0 115.867 5.810 -999.990 -999.990 1.159 ..P WKT 2010 10 27 13 29 55 31.3200 -97.3300 251.000 30.0 132.627 5.610 -999.990 -999.990 1.326 ..P WKT 2010 10 27 13 34 55 31.3200 -97.3300 251.000 122.0 127.837 6.000 -999.990 -999.990 1.278 ..P WKT 2010 10 27 13 39 55 31.3200 -97.3300 251.000 457.0 120.033 5.680 -999.990 -999.990 1.200 ..P WKT 2010 10 27 13 44 55 31.3200 -97.3300 251.000 30.0 130.589 5.680 -999.990 -999.990 1.306 ..P WKT 2010 10 27 13 49 55 31.3200 -97.3300 251.000 122.0 135.389 5.820 -999.990 -999.990 1.354 ..P WKT 2010 10 27 13 54 55 31.3200 -97.3300 251.000 457.0 134.162 5.660 -999.990 -999.990 1.342 ..P WKT 2010 10 27 14 04 55 31.3200 -97.3300 251.000 30.0 144.380 6.500 -999.990 -999.990 1.444 ..P WKT 2010 10 27 14 09 55 31.3200 -97.3300 251.000 122.0 128.724 5.570 -999.990 -999.990 1.287 ..P WKT 2010 10 27 14 14 55 31.3200 -97.3300 251.000 457.0 125.389 5.830 -999.990 -999.990 1.254 ..P WKT 2010 10 27 14 19 55 31.3200 -97.3300 251.000 30.0 152.422 5.470 -999.990 -999.990 1.524 ..P WKT 2010 10 27 14 24 55 31.3200 -97.3300 251.000 122.0 131.030 5.540 -999.990 -999.990 1.310 ..P WKT 2010 10 27 14 29 55 31.3200 -97.3300 251.000 457.0 122.226 5.620 -999.990 -999.990 1.222 ..P WKT 2010 10 27 14 39 55 31.3200 -97.3300 251.000 30.0 154.519 5.620 -999.990 -999.990 1.545 ..P WKT 2010 10 27 14 44 55 31.3200 -97.3300 251.000 122.0 132.734 6.360 -999.990 -999.990 1.327 ..P WKT 2010 10 27 14 49 55 31.3200 -97.3300 251.000 457.0 130.358 5.410 -999.990 -999.990 1.304 ..P WKT 2010 10 27 14 54 55 31.3200 -97.3300 251.000 30.0 169.783 6.380 -999.990 -999.990 1.698 ..P WKT 2010 10 27 14 59 55 31.3200 -97.3300 251.000 122.0 137.902 5.410 -999.990 -999.990 1.379 ..P WKT 2010 10 27 15 04 55 31.3200 -97.3300 251.000 457.0 126.651 5.750 -999.990 -999.990 1.267 ..P WKT 2010 10 27 15 14 55 31.3200 -97.3300 251.000 30.0 162.270 5.580 -999.990 -999.990 1.623 ..P WKT 2010 10 27 15 19 55 31.3200 -97.3300 251.000 122.0 153.712 6.140 -999.990 -999.990 1.537 ..P WKT 2010 10 27 15 24 55 31.3200 -97.3300 251.000 457.0 133.559 5.530 -999.990 -999.990 1.336 ..P WKT 2010 10 27 15 29 55 31.3200 -97.3300 251.000 30.0 158.021 6.950 -999.990 -999.990 1.580 ..P WKT 2010 10 27 15 34 55 31.3200 -97.3300 251.000 122.0 154.106 5.360 -999.990 -999.990 1.541 ..P WKT 2010 10 27 15 39 55 31.3200 -97.3300 251.000 457.0 135.466 5.450 -999.990 -999.990 1.355 ..P WKT 2010 10 27 15 49 55 31.3200 -97.3300 251.000 30.0 151.307 7.070 -999.990 -999.990 1.513 ..P WKT 2010 10 27 15 54 55 31.3200 -97.3300 251.000 122.0 148.836 6.580 -999.990 -999.990 1.488 ..P WKT 2010 10 27 15 59 55 31.3200 -97.3300 251.000 457.0 123.886 5.500 -999.990 -999.990 1.239 ..P WKT 2010 10 27 16 04 55 31.3200 -97.3300 251.000 30.0 128.233 5.390 -999.990 -999.990 1.282 ..P WKT 2010 10 27 16 09 55 31.3200 -97.3300 251.000 122.0 121.138 6.310 -999.990 -999.990 1.211 ..P WKT 2010 10 27 16 14 55 31.3200 -97.3300 251.000 457.0 122.352 5.390 -999.990 -999.990 1.224 ..P WKT 2010 10 27 16 24 55 31.3200 -97.3300 251.000 30.0 123.729 5.280 -999.990 -999.990 1.237 ..P WKT 2010 10 27 16 29 55 31.3200 -97.3300 251.000 122.0 128.655 5.710 -999.990 -999.990 1.287 ..P WKT 2010 10 27 16 34 55 31.3200 -97.3300 251.000 457.0 128.817 5.080 -999.990 -999.990 1.288 ..P WKT 2010 10 27 16 39 55 31.3200 -97.3300 251.000 30.0 131.564 5.170 -999.990 -999.990 1.316 ..P WKT 2010 10 27 16 44 55 31.3200 -97.3300 251.000 122.0 131.589 5.570 -999.990 -999.990 1.316 ..P WKT 2010 10 27 16 49 55 31.3200 -97.3300 251.000 457.0 123.592 5.010 -999.990 -999.990 1.236 ..P WKT 2010 10 27 17 04 55 31.3200 -97.3300 251.000 30.0 121.625 5.160 -999.990 -999.990 1.216 ..P WKT 2010 10 27 17 09 55 31.3200 -97.3300 251.000 122.0 122.598 5.080 -999.990 -999.990 1.226 ..P WKT 2010 10 27 17 14 55 31.3200 -97.3300 251.000 457.0 124.115 6.050 -999.990 -999.990 1.241 ..P WKT 2010 10 27 17 19 55 31.3200 -97.3300 251.000 30.0 109.333 5.040 -999.990 -999.990 1.093 ..P WKT 2010 10 27 17 24 55 31.3200 -97.3300 251.000 122.0 116.554 5.070 -999.990 -999.990 1.166 ..P WKT 2010 10 27 17 29 55 31.3200 -97.3300 251.000 457.0 114.270 4.970 -999.990 -999.990 1.143 ..P WKT 2010 10 27 17 39 55 31.3200 -97.3300 251.000 30.0 122.135 5.220 -999.990 -999.990 1.221 ..P WKT 2010 10 27 17 44 55 31.3200 -97.3300 251.000 122.0 126.039 5.180 -999.990 -999.990 1.260 ..P WKT 2010 10 27 17 49 55 31.3200 -97.3300 251.000 457.0 120.988 4.940 -999.990 -999.990 1.210 ..P WKT 2010 10 27 17 54 55 31.3200 -97.3300 251.000 30.0 129.773 5.000 -999.990 -999.990 1.298 ..P WKT 2010 10 27 17 59 55 31.3200 -97.3300 251.000 122.0 124.453 4.790 -999.990 -999.990 1.245 ..P WKT 2010 10 27 18 04 55 31.3200 -97.3300 251.000 457.0 120.490 5.060 -999.990 -999.990 1.205 ..P WKT 2010 10 27 18 14 55 31.3200 -97.3300 251.000 30.0 123.333 4.750 -999.990 -999.990 1.233 ..P WKT 2010 10 27 18 19 55 31.3200 -97.3300 251.000 122.0 132.303 4.900 -999.990 -999.990 1.323 ..P WKT 2010 10 27 18 24 55 31.3200 -97.3300 251.000 457.0 118.240 6.360 -999.990 -999.990 1.182 ..P WKT 2010 10 27 18 29 55 31.3200 -97.3300 251.000 30.0 120.705 5.570 -999.990 -999.990 1.207 ..P WKT 2010 10 27 18 34 55 31.3200 -97.3300 251.000 122.0 127.232 4.950 -999.990 -999.990 1.272 ..P WKT 2010 10 27 18 39 55 31.3200 -97.3300 251.000 457.0 120.760 4.770 -999.990 -999.990 1.208 ..P WKT 2010 10 27 18 49 55 31.3200 -97.3300 251.000 30.0 121.936 4.940 -999.990 -999.990 1.219 ..P WKT 2010 10 27 18 54 55 31.3200 -97.3300 251.000 122.0 127.955 4.850 -999.990 -999.990 1.280 ..P WKT 2010 10 27 18 59 55 31.3200 -97.3300 251.000 457.0 123.150 6.540 -999.990 -999.990 1.232 ..P WKT 2010 10 27 19 04 55 31.3200 -97.3300 251.000 30.0 119.158 6.450 -999.990 -999.990 1.192 ..P WKT 2010 10 27 19 09 55 31.3200 -97.3300 251.000 122.0 128.555 5.830 -999.990 -999.990 1.286 ..P WKT 2010 10 27 19 14 55 31.3200 -97.3300 251.000 457.0 124.564 5.430 -999.990 -999.990 1.246 ..P WKT 2010 10 27 19 24 55 31.3200 -97.3300 251.000 30.0 120.582 5.200 -999.990 -999.990 1.206 ..P WKT 2010 10 27 19 29 55 31.3200 -97.3300 251.000 122.0 129.237 5.830 -999.990 -999.990 1.292 ..P WKT 2010 10 27 19 34 55 31.3200 -97.3300 251.000 457.0 125.191 6.190 -999.990 -999.990 1.252 ..P WKT 2010 10 27 19 39 55 31.3200 -97.3300 251.000 30.0 116.149 5.810 -999.990 -999.990 1.161 ..P WKT 2010 10 27 19 44 55 31.3200 -97.3300 251.000 122.0 119.939 5.440 -999.990 -999.990 1.199 ..P WKT 2010 10 27 19 49 55 31.3200 -97.3300 251.000 457.0 121.027 4.520 -999.990 -999.990 1.210 ..P WKT 2010 10 27 19 59 55 31.3200 -97.3300 251.000 30.0 110.363 4.450 -999.990 -999.990 1.104 ..P WKT 2010 10 27 20 04 55 31.3200 -97.3300 251.000 122.0 117.775 4.630 -999.990 -999.990 1.178 ..P WKT 2010 10 27 20 09 55 31.3200 -97.3300 251.000 457.0 118.438 4.790 -999.990 -999.990 1.184 ..P WKT 2010 10 27 20 14 55 31.3200 -97.3300 251.000 30.0 109.931 4.770 -999.990 -999.990 1.099 ..P WKT 2010 10 27 20 19 55 31.3200 -97.3300 251.000 122.0 117.338 4.850 -999.990 -999.990 1.173 ..P WKT 2010 10 27 20 24 55 31.3200 -97.3300 251.000 457.0 109.104 4.460 -999.990 -999.990 1.091 ..P WKT 2010 10 27 20 34 55 31.3200 -97.3300 251.000 30.0 118.424 4.820 -999.990 -999.990 1.184 ..P WKT 2010 10 27 20 39 55 31.3200 -97.3300 251.000 122.0 122.629 4.680 -999.990 -999.990 1.226 ..P WKT 2010 10 27 20 44 55 31.3200 -97.3300 251.000 457.0 119.288 4.870 -999.990 -999.990 1.193 ..P WKT 2010 10 27 20 49 55 31.3200 -97.3300 251.000 30.0 116.083 5.240 -999.990 -999.990 1.161 ..P WKT 2010 10 27 20 54 55 31.3200 -97.3300 251.000 122.0 119.747 4.900 -999.990 -999.990 1.197 ..P WKT 2010 10 27 20 59 55 31.3200 -97.3300 251.000 457.0 114.524 4.740 -999.990 -999.990 1.145 ..P WKT 2010 10 27 21 09 55 31.3200 -97.3300 251.000 30.0 111.428 4.680 -999.990 -999.990 1.114 ..P WKT 2010 10 27 21 14 55 31.3200 -97.3300 251.000 122.0 119.069 4.670 -999.990 -999.990 1.191 ..P WKT 2010 10 27 21 19 55 31.3200 -97.3300 251.000 457.0 112.716 5.020 -999.990 -999.990 1.127 ..P WKT 2010 10 27 21 24 55 31.3200 -97.3300 251.000 30.0 116.588 4.840 -999.990 -999.990 1.166 ..P WKT 2010 10 27 21 29 55 31.3200 -97.3300 251.000 122.0 122.610 4.780 -999.990 -999.990 1.226 ..P WKT 2010 10 27 21 34 55 31.3200 -97.3300 251.000 457.0 121.100 5.040 -999.990 -999.990 1.211 ..P WKT 2010 10 27 21 44 55 31.3200 -97.3300 251.000 30.0 121.078 5.110 -999.990 -999.990 1.211 ..P WKT 2010 10 27 21 49 55 31.3200 -97.3300 251.000 122.0 131.970 5.520 -999.990 -999.990 1.320 ..P WKT 2010 10 27 21 54 55 31.3200 -97.3300 251.000 457.0 127.005 4.750 -999.990 -999.990 1.270 ..P WKT 2010 10 27 21 59 55 31.3200 -97.3300 251.000 30.0 116.132 4.880 -999.990 -999.990 1.161 ..P WKT 2010 10 27 22 04 55 31.3200 -97.3300 251.000 122.0 119.767 4.690 -999.990 -999.990 1.198 ..P WKT 2010 10 27 22 09 55 31.3200 -97.3300 251.000 457.0 125.279 4.600 -999.990 -999.990 1.253 ..P WKT 2010 10 27 22 19 55 31.3200 -97.3300 251.000 30.0 117.778 4.500 -999.990 -999.990 1.178 ..P WKT 2010 10 27 22 24 55 31.3200 -97.3300 251.000 122.0 125.435 5.120 -999.990 -999.990 1.254 ..P WKT 2010 10 27 22 29 55 31.3200 -97.3300 251.000 457.0 123.698 4.660 -999.990 -999.990 1.237 ..P WKT 2010 10 27 22 34 55 31.3200 -97.3300 251.000 30.0 122.498 7.120 -999.990 -999.990 1.225 ..P WKT 2010 10 27 22 39 55 31.3200 -97.3300 251.000 122.0 130.150 4.550 -999.990 -999.990 1.302 ..P WKT 2010 10 27 22 44 55 31.3200 -97.3300 251.000 457.0 127.341 4.050 -999.990 -999.990 1.273 ..P WKT 2010 10 27 22 54 55 31.3200 -97.3300 251.000 30.0 121.419 4.360 -999.990 -999.990 1.214 ..P WKT 2010 10 27 22 59 55 31.3200 -97.3300 251.000 122.0 127.285 5.410 -999.990 -999.990 1.273 ..P WKT 2010 10 27 23 04 55 31.3200 -97.3300 251.000 457.0 125.110 4.640 -999.990 -999.990 1.251 ..P WKT 2010 10 27 23 09 55 31.3200 -97.3300 251.000 30.0 124.944 5.070 -999.990 -999.990 1.249 ..P WKT 2010 10 27 23 14 55 31.3200 -97.3300 251.000 122.0 128.530 4.310 -999.990 -999.990 1.285 ..P WKT 2010 10 27 23 19 55 31.3200 -97.3300 251.000 457.0 127.829 3.940 -999.990 -999.990 1.278 ..P WKT 2010 10 27 23 29 55 31.3200 -97.3300 251.000 30.0 128.153 4.360 -999.990 -999.990 1.282 ..P WKT 2010 10 27 23 34 55 31.3200 -97.3300 251.000 122.0 129.578 4.120 -999.990 -999.990 1.296 ..P WKT 2010 10 27 23 39 55 31.3200 -97.3300 251.000 457.0 126.053 4.500 -999.990 -999.990 1.261 ..P WKT 2010 10 27 23 44 55 31.3200 -97.3300 251.000 30.0 124.536 4.790 -999.990 -999.990 1.245 ..P WKT 2010 10 27 23 49 55 31.3200 -97.3300 251.000 122.0 132.782 4.660 -999.990 -999.990 1.328 ..P WKT 2010 10 28 00 09 55 31.3200 -97.3300 251.000 457.0 125.535 4.610 -999.990 -999.990 1.255 ..P WKT 2010 10 28 00 10 25 31.3200 -97.3300 251.000 457.0 127.948 5.510 -999.990 -999.990 1.279 ..P WKT 2010 10 28 00 10 55 31.3200 -97.3300 251.000 457.0 123.944 4.770 -999.990 -999.990 1.239 ..P WKT 2010 10 28 00 11 25 31.3200 -97.3300 251.000 457.0 126.357 4.940 -999.990 -999.990 1.264 ..P WKT 2010 10 28 00 11 55 31.3200 -97.3300 251.000 457.0 128.636 4.780 -999.990 -999.990 1.286 ..P WKT 2010 10 28 00 12 25 31.3200 -97.3300 251.000 457.0 127.172 4.440 -999.990 -999.990 1.272 ..P WKT 2010 10 28 00 12 55 31.3200 -97.3300 251.000 457.0 128.650 4.760 -999.990 -999.990 1.286 ..P WKT 2010 10 28 00 13 25 31.3200 -97.3300 251.000 457.0 127.854 5.100 -999.990 -999.990 1.279 ..P WKT 2010 10 28 00 13 55 31.3200 -97.3300 251.000 457.0 124.117 4.480 -999.990 -999.990 1.241 ..P WKT 2010 10 28 00 14 25 31.3200 -97.3300 251.000 457.0 127.733 4.670 -999.990 -999.990 1.277 ..P WKT 2010 10 28 00 14 55 31.3200 -97.3300 251.000 457.0 128.676 4.420 -999.990 -999.990 1.287 ..P WKT 2010 10 28 00 19 55 31.3200 -97.3300 251.000 30.0 124.061 4.290 -999.990 -999.990 1.241 ..P WKT 2010 10 28 00 24 55 31.3200 -97.3300 251.000 122.0 123.191 4.440 -999.990 -999.990 1.232 ..P WKT 2010 10 28 00 29 55 31.3200 -97.3300 251.000 457.0 129.004 4.350 -999.990 -999.990 1.290 ..P WKT 2010 10 28 00 34 55 31.3200 -97.3300 251.000 30.0 122.252 4.810 -999.990 -999.990 1.223 ..P WKT 2010 10 28 00 39 55 31.3200 -97.3300 251.000 122.0 128.200 4.280 -999.990 -999.990 1.282 ..P WKT 2010 10 28 00 44 55 31.3200 -97.3300 251.000 457.0 121.045 4.600 -999.990 -999.990 1.210 ..P WKT 2010 10 28 00 54 55 31.3200 -97.3300 251.000 30.0 124.111 4.380 -999.990 -999.990 1.241 ..P WKT 2010 10 28 00 59 55 31.3200 -97.3300 251.000 122.0 125.373 3.920 -999.990 -999.990 1.254 ..P WKT 2010 10 28 01 04 55 31.3200 -97.3300 251.000 457.0 119.415 3.890 -999.990 -999.990 1.194 ..P WKT 2010 10 28 01 09 55 31.3200 -97.3300 251.000 30.0 116.398 4.170 -999.990 -999.990 1.164 ..P WKT 2010 10 28 01 14 55 31.3200 -97.3300 251.000 122.0 116.859 3.650 -999.990 -999.990 1.169 ..P WKT 2010 10 28 01 19 55 31.3200 -97.3300 251.000 457.0 120.527 3.720 -999.990 -999.990 1.205 ..P WKT 2010 10 28 01 29 55 31.3200 -97.3300 251.000 30.0 120.893 3.810 -999.990 -999.990 1.209 ..P WKT 2010 10 28 01 34 55 31.3200 -97.3300 251.000 122.0 128.821 4.680 -999.990 -999.990 1.288 ..P WKT 2010 10 28 01 39 55 31.3200 -97.3300 251.000 457.0 141.297 3.950 -999.990 -999.990 1.413 ..P WKT 2010 10 28 01 44 55 31.3200 -97.3300 251.000 30.0 124.355 4.410 -999.990 -999.990 1.244 ..P WKT 2010 10 28 01 49 55 31.3200 -97.3300 251.000 122.0 129.075 3.860 -999.990 -999.990 1.291 ..P WKT 2010 10 28 01 54 55 31.3200 -97.3300 251.000 457.0 140.748 3.980 -999.990 -999.990 1.407 ..P WKT 2010 10 28 02 04 55 31.3200 -97.3300 251.000 30.0 126.653 4.520 -999.990 -999.990 1.267 ..P WKT 2010 10 28 02 09 55 31.3200 -97.3300 251.000 122.0 132.978 4.500 -999.990 -999.990 1.330 ..P WKT 2010 10 28 02 14 55 31.3200 -97.3300 251.000 457.0 145.187 3.950 -999.990 -999.990 1.452 ..P WKT 2010 10 28 02 19 55 31.3200 -97.3300 251.000 30.0 132.256 3.940 -999.990 -999.990 1.323 ..P WKT 2010 10 28 02 24 55 31.3200 -97.3300 251.000 122.0 135.638 3.930 -999.990 -999.990 1.356 ..P WKT 2010 10 28 02 29 55 31.3200 -97.3300 251.000 457.0 152.394 3.840 -999.990 -999.990 1.524 ..P WKT 2010 10 28 02 39 55 31.3200 -97.3300 251.000 30.0 138.051 3.780 -999.990 -999.990 1.381 ..P WKT 2010 10 28 02 44 55 31.3200 -97.3300 251.000 122.0 146.000 4.880 -999.990 -999.990 1.460 ..P WKT 2010 10 28 02 49 55 31.3200 -97.3300 251.000 457.0 151.409 4.170 -999.990 -999.990 1.514 ..P WKT 2010 10 28 02 54 55 31.3200 -97.3300 251.000 30.0 145.985 4.170 -999.990 -999.990 1.460 ..P WKT 2010 10 28 02 59 55 31.3200 -97.3300 251.000 122.0 143.636 3.910 -999.990 -999.990 1.436 ..P WKT 2010 10 28 03 04 55 31.3200 -97.3300 251.000 457.0 129.519 4.560 -999.990 -999.990 1.295 ..P WKT 2010 10 28 03 14 55 31.3200 -97.3300 251.000 30.0 141.463 4.160 -999.990 -999.990 1.415 ..P WKT 2010 10 28 03 19 55 31.3200 -97.3300 251.000 122.0 142.917 4.100 -999.990 -999.990 1.429 ..P WKT 2010 10 28 03 24 55 31.3200 -97.3300 251.000 457.0 128.456 4.960 -999.990 -999.990 1.285 ..P WKT 2010 10 28 03 29 55 31.3200 -97.3300 251.000 30.0 131.380 4.010 -999.990 -999.990 1.314 ..P WKT 2010 10 28 03 34 55 31.3200 -97.3300 251.000 122.0 133.101 4.020 -999.990 -999.990 1.331 ..P WKT 2010 10 28 03 39 55 31.3200 -97.3300 251.000 457.0 109.545 4.150 -999.990 -999.990 1.095 ..P WKT 2010 10 28 03 49 55 31.3200 -97.3300 251.000 30.0 124.031 4.250 -999.990 -999.990 1.240 ..P WKT 2010 10 28 03 54 55 31.3200 -97.3300 251.000 122.0 123.955 4.050 -999.990 -999.990 1.240 ..P WKT 2010 10 28 03 59 55 31.3200 -97.3300 251.000 457.0 110.505 4.170 -999.990 -999.990 1.105 ..P WKT 2010 10 28 04 04 55 31.3200 -97.3300 251.000 30.0 121.532 4.560 -999.990 -999.990 1.215 ..P WKT 2010 10 28 04 09 55 31.3200 -97.3300 251.000 122.0 125.470 3.930 -999.990 -999.990 1.255 ..P WKT 2010 10 28 04 14 55 31.3200 -97.3300 251.000 457.0 118.038 4.360 -999.990 -999.990 1.180 ..P WKT 2010 10 28 04 24 55 31.3200 -97.3300 251.000 30.0 124.653 4.110 -999.990 -999.990 1.247 ..P WKT 2010 10 28 04 29 55 31.3200 -97.3300 251.000 122.0 129.604 4.140 -999.990 -999.990 1.296 ..P WKT 2010 10 28 04 34 55 31.3200 -97.3300 251.000 457.0 128.402 4.240 -999.990 -999.990 1.284 ..P WKT 2010 10 28 04 39 55 31.3200 -97.3300 251.000 30.0 126.531 3.880 -999.990 -999.990 1.265 ..P WKT 2010 10 28 04 44 55 31.3200 -97.3300 251.000 122.0 126.800 3.540 -999.990 -999.990 1.268 ..P WKT 2010 10 28 04 49 55 31.3200 -97.3300 251.000 457.0 127.872 3.260 -999.990 -999.990 1.279 ..P WKT 2010 10 28 05 04 55 31.3200 -97.3300 251.000 30.0 128.650 3.300 -999.990 -999.990 1.286 ..P WKT 2010 10 28 05 09 55 31.3200 -97.3300 251.000 122.0 132.317 3.030 -999.990 -999.990 1.323 ..P WKT 2010 10 28 05 14 55 31.3200 -97.3300 251.000 457.0 123.943 3.040 -999.990 -999.990 1.239 ..P WKT 2010 10 28 05 19 55 31.3200 -97.3300 251.000 30.0 128.144 4.020 -999.990 -999.990 1.281 ..P WKT 2010 10 28 05 24 55 31.3200 -97.3300 251.000 122.0 134.219 2.980 -999.990 -999.990 1.342 ..P WKT 2010 10 28 05 29 55 31.3200 -97.3300 251.000 457.0 121.831 4.060 -999.990 -999.990 1.218 ..P WKT 2010 10 28 05 39 55 31.3200 -97.3300 251.000 30.0 119.478 3.550 -999.990 -999.990 1.195 ..P WKT 2010 10 28 05 44 55 31.3200 -97.3300 251.000 122.0 126.303 5.670 -999.990 -999.990 1.263 ..P WKT 2010 10 28 05 49 55 31.3200 -97.3300 251.000 457.0 116.538 3.550 -999.990 -999.990 1.165 ..P WKT 2010 10 28 05 54 55 31.3200 -97.3300 251.000 30.0 126.841 3.450 -999.990 -999.990 1.268 ..P WKT 2010 10 28 05 59 55 31.3200 -97.3300 251.000 122.0 122.696 4.500 -999.990 -999.990 1.227 ..P WKT 2010 10 28 06 04 55 31.3200 -97.3300 251.000 457.0 116.677 3.590 -999.990 -999.990 1.167 ..P WKT 2010 10 28 06 14 55 31.3200 -97.3300 251.000 30.0 122.739 3.160 -999.990 -999.990 1.227 ..P WKT 2010 10 28 06 19 55 31.3200 -97.3300 251.000 122.0 120.370 3.340 -999.990 -999.990 1.204 ..P WKT 2010 10 28 06 24 55 31.3200 -97.3300 251.000 457.0 108.368 2.870 -999.990 -999.990 1.084 ..P WKT 2010 10 28 06 29 55 31.3200 -97.3300 251.000 30.0 118.041 3.500 -999.990 -999.990 1.180 ..P WKT 2010 10 28 06 34 55 31.3200 -97.3300 251.000 122.0 115.673 3.080 -999.990 -999.990 1.157 ..P WKT 2010 10 28 06 39 55 31.3200 -97.3300 251.000 457.0 109.290 4.920 -999.990 -999.990 1.093 ..P WKT 2010 10 28 06 49 55 31.3200 -97.3300 251.000 30.0 124.413 4.990 -999.990 -999.990 1.244 ..P WKT 2010 10 28 06 54 55 31.3200 -97.3300 251.000 122.0 115.144 6.540 -999.990 -999.990 1.151 ..P WKT 2010 10 28 06 59 55 31.3200 -97.3300 251.000 457.0 112.297 3.300 -999.990 -999.990 1.123 ..P WKT 2010 10 28 07 04 55 31.3200 -97.3300 251.000 30.0 127.380 4.890 -999.990 -999.990 1.274 ..P WKT 2010 10 28 07 09 55 31.3200 -97.3300 251.000 122.0 118.914 3.010 -999.990 -999.990 1.189 ..P WKT 2010 10 28 07 14 55 31.3200 -97.3300 251.000 457.0 111.652 3.210 -999.990 -999.990 1.117 ..P WKT 2010 10 28 07 24 55 31.3200 -97.3300 251.000 30.0 119.702 3.540 -999.990 -999.990 1.197 ..P WKT 2010 10 28 07 29 55 31.3200 -97.3300 251.000 122.0 116.550 2.270 -999.990 -999.990 1.165 ..P WKT 2010 10 28 07 34 55 31.3200 -97.3300 251.000 457.0 110.587 4.250 -999.990 -999.990 1.106 ..P WKT 2010 10 28 07 39 55 31.3200 -97.3300 251.000 30.0 122.422 4.080 -999.990 -999.990 1.224 ..P WKT 2010 10 28 07 44 55 31.3200 -97.3300 251.000 122.0 112.310 4.340 -999.990 -999.990 1.123 ..P WKT 2010 10 28 07 49 55 31.3200 -97.3300 251.000 457.0 104.875 3.190 -999.990 -999.990 1.049 ..P WKT 2010 10 28 07 59 55 31.3200 -97.3300 251.000 30.0 116.348 3.960 -999.990 -999.990 1.163 ..P WKT 2010 10 28 08 04 55 31.3200 -97.3300 251.000 122.0 113.310 4.580 -999.990 -999.990 1.133 ..P WKT 2010 10 28 08 09 55 31.3200 -97.3300 251.000 457.0 99.164 3.410 -999.990 -999.990 0.992 ..P WKT 2010 10 28 08 14 55 31.3200 -97.3300 251.000 30.0 117.672 3.200 -999.990 -999.990 1.177 ..P WKT 2010 10 28 08 19 55 31.3200 -97.3300 251.000 122.0 119.318 2.770 -999.990 -999.990 1.193 ..P WKT 2010 10 28 08 24 55 31.3200 -97.3300 251.000 457.0 114.941 2.950 -999.990 -999.990 1.149 ..P WKT 2010 10 28 08 34 55 31.3200 -97.3300 251.000 30.0 129.513 2.980 -999.990 -999.990 1.295 ..P WKT 2010 10 28 08 39 55 31.3200 -97.3300 251.000 122.0 128.654 3.430 -999.990 -999.990 1.287 ..P WKT 2010 10 28 08 44 55 31.3200 -97.3300 251.000 457.0 105.178 2.510 -999.990 -999.990 1.052 ..P WKT 2010 10 28 08 49 55 31.3200 -97.3300 251.000 30.0 127.338 3.640 -999.990 -999.990 1.273 ..P WKT 2010 10 28 08 54 55 31.3200 -97.3300 251.000 122.0 129.959 2.660 -999.990 -999.990 1.300 ..P WKT 2010 10 28 08 59 55 31.3200 -97.3300 251.000 457.0 101.531 2.320 -999.990 -999.990 1.015 ..P WKT 2010 10 28 09 09 55 31.3200 -97.3300 251.000 30.0 134.687 2.640 -999.990 -999.990 1.347 ..P WKT 2010 10 28 09 14 55 31.3200 -97.3300 251.000 122.0 129.087 3.950 -999.990 -999.990 1.291 ..P WKT 2010 10 28 09 19 55 31.3200 -97.3300 251.000 457.0 99.395 2.780 -999.990 -999.990 0.994 ..P WKT 2010 10 28 09 24 55 31.3200 -97.3300 251.000 30.0 126.184 2.740 -999.990 -999.990 1.262 ..P WKT 2010 10 28 09 29 55 31.3200 -97.3300 251.000 122.0 130.755 2.890 -999.990 -999.990 1.308 ..P WKT 2010 10 28 09 34 55 31.3200 -97.3300 251.000 457.0 101.063 2.950 -999.990 -999.990 1.011 ..P WKT 2010 10 28 09 44 55 31.3200 -97.3300 251.000 30.0 136.669 2.690 -999.990 -999.990 1.367 ..P WKT 2010 10 28 09 49 55 31.3200 -97.3300 251.000 122.0 137.722 2.870 -999.990 -999.990 1.377 ..P WKT 2010 10 28 09 54 55 31.3200 -97.3300 251.000 457.0 109.596 3.130 -999.990 -999.990 1.096 ..P WKT 2010 10 28 09 59 55 31.3200 -97.3300 251.000 30.0 132.869 2.610 -999.990 -999.990 1.329 ..P WKT 2010 10 28 10 04 55 31.3200 -97.3300 251.000 122.0 124.820 3.940 -999.990 -999.990 1.248 ..P WKT 2010 10 28 10 09 55 31.3200 -97.3300 251.000 457.0 106.599 3.110 -999.990 -999.990 1.066 ..P WKT 2010 10 28 10 19 55 31.3200 -97.3300 251.000 30.0 128.803 2.280 -999.990 -999.990 1.288 ..P WKT 2010 10 28 10 24 55 31.3200 -97.3300 251.000 122.0 124.788 3.240 -999.990 -999.990 1.248 ..P WKT 2010 10 28 10 29 55 31.3200 -97.3300 251.000 457.0 106.318 2.980 -999.990 -999.990 1.063 ..P WKT 2010 10 28 10 34 55 31.3200 -97.3300 251.000 30.0 133.091 3.580 -999.990 -999.990 1.331 ..P WKT 2010 10 28 10 39 55 31.3200 -97.3300 251.000 122.0 120.242 3.110 -999.990 -999.990 1.202 ..P WKT 2010 10 28 10 44 55 31.3200 -97.3300 251.000 457.0 105.653 4.300 -999.990 -999.990 1.057 ..P WKT 2010 10 28 10 54 55 31.3200 -97.3300 251.000 30.0 125.161 4.300 -999.990 -999.990 1.252 ..P WKT 2010 10 28 10 59 55 31.3200 -97.3300 251.000 122.0 121.644 3.320 -999.990 -999.990 1.216 ..P WKT 2010 10 28 11 04 55 31.3200 -97.3300 251.000 457.0 109.561 4.100 -999.990 -999.990 1.096 ..P WKT 2010 10 28 11 09 55 31.3200 -97.3300 251.000 30.0 130.272 3.470 -999.990 -999.990 1.303 ..P WKT 2010 10 28 11 14 55 31.3200 -97.3300 251.000 122.0 121.000 2.560 -999.990 -999.990 1.210 ..P WKT 2010 10 28 11 19 55 31.3200 -97.3300 251.000 457.0 109.584 2.920 -999.990 -999.990 1.096 ..P WKT 2010 10 28 11 29 55 31.3200 -97.3300 251.000 30.0 131.389 3.880 -999.990 -999.990 1.314 ..P WKT 2010 10 28 11 34 55 31.3200 -97.3300 251.000 122.0 132.079 3.230 -999.990 -999.990 1.321 ..P WKT 2010 10 28 11 39 55 31.3200 -97.3300 251.000 457.0 114.161 2.790 -999.990 -999.990 1.142 ..P WKT 2010 10 28 11 44 55 31.3200 -97.3300 251.000 30.0 130.246 3.490 -999.990 -999.990 1.302 ..P WKT 2010 10 28 11 49 55 31.3200 -97.3300 251.000 122.0 137.229 3.660 -999.990 -999.990 1.372 ..P WKT 2010 10 28 12 09 55 31.3200 -97.3300 251.000 457.0 108.388 5.070 -999.990 -999.990 1.084 ..P WKT 2010 10 28 12 10 25 31.3200 -97.3300 251.000 457.0 110.283 4.180 -999.990 -999.990 1.103 ..P WKT 2010 10 28 12 10 55 31.3200 -97.3300 251.000 457.0 108.963 4.700 -999.990 -999.990 1.090 ..P WKT 2010 10 28 12 11 25 31.3200 -97.3300 251.000 457.0 108.044 4.460 -999.990 -999.990 1.080 ..P WKT 2010 10 28 12 11 55 31.3200 -97.3300 251.000 457.0 106.858 4.270 -999.990 -999.990 1.069 ..P WKT 2010 10 28 12 12 25 31.3200 -97.3300 251.000 457.0 105.672 4.320 -999.990 -999.990 1.057 ..P WKT 2010 10 28 12 12 55 31.3200 -97.3300 251.000 457.0 107.166 3.930 -999.990 -999.990 1.072 ..P WKT 2010 10 28 12 13 25 31.3200 -97.3300 251.000 457.0 109.999 4.520 -999.990 -999.990 1.100 ..P WKT 2010 10 28 12 13 55 31.3200 -97.3300 251.000 457.0 108.678 4.340 -999.990 -999.990 1.087 ..P WKT 2010 10 28 12 14 25 31.3200 -97.3300 251.000 457.0 111.243 4.080 -999.990 -999.990 1.112 ..P WKT 2010 10 28 12 14 55 31.3200 -97.3300 251.000 457.0 105.234 4.070 -999.990 -999.990 1.052 ..P WKT 2010 10 28 12 19 55 31.3200 -97.3300 251.000 30.0 120.303 4.470 -999.990 -999.990 1.203 ..P WKT 2010 10 28 12 24 55 31.3200 -97.3300 251.000 122.0 128.677 3.910 -999.990 -999.990 1.287 ..P WKT 2010 10 28 12 29 55 31.3200 -97.3300 251.000 457.0 106.087 4.350 -999.990 -999.990 1.061 ..P WKT 2010 10 28 12 34 55 31.3200 -97.3300 251.000 30.0 127.871 4.030 -999.990 -999.990 1.279 ..P WKT 2010 10 28 12 39 55 31.3200 -97.3300 251.000 122.0 131.558 3.780 -999.990 -999.990 1.316 ..P WKT 2010 10 28 12 44 55 31.3200 -97.3300 251.000 457.0 111.368 3.470 -999.990 -999.990 1.114 ..P WKT 2010 10 28 12 54 55 31.3200 -97.3300 251.000 30.0 128.785 4.440 -999.990 -999.990 1.288 ..P WKT 2010 10 28 12 59 55 31.3200 -97.3300 251.000 122.0 132.856 3.500 -999.990 -999.990 1.329 ..P WKT 2010 10 28 13 04 55 31.3200 -97.3300 251.000 457.0 105.780 3.700 -999.990 -999.990 1.058 ..P WKT 2010 10 28 13 09 55 31.3200 -97.3300 251.000 30.0 126.234 3.550 -999.990 -999.990 1.262 ..P WKT 2010 10 28 13 14 55 31.3200 -97.3300 251.000 122.0 120.636 4.040 -999.990 -999.990 1.206 ..P WKT 2010 10 28 13 19 55 31.3200 -97.3300 251.000 457.0 111.274 3.530 -999.990 -999.990 1.113 ..P WKT 2010 10 28 13 29 55 31.3200 -97.3300 251.000 30.0 126.604 3.210 -999.990 -999.990 1.266 ..P WKT 2010 10 28 13 34 55 31.3200 -97.3300 251.000 122.0 125.227 3.480 -999.990 -999.990 1.252 ..P WKT 2010 10 28 13 39 55 31.3200 -97.3300 251.000 457.0 114.436 3.260 -999.990 -999.990 1.144 ..P WKT 2010 10 28 13 44 55 31.3200 -97.3300 251.000 30.0 126.507 2.650 -999.990 -999.990 1.265 ..P WKT 2010 10 28 13 49 55 31.3200 -97.3300 251.000 122.0 132.394 3.770 -999.990 -999.990 1.324 ..P WKT 2010 10 28 13 54 55 31.3200 -97.3300 251.000 457.0 113.523 2.350 -999.990 -999.990 1.135 ..P WKT 2010 10 28 14 04 55 31.3200 -97.3300 251.000 30.0 126.839 2.900 -999.990 -999.990 1.268 ..P WKT 2010 10 28 14 09 55 31.3200 -97.3300 251.000 122.0 129.692 2.220 -999.990 -999.990 1.297 ..P WKT 2010 10 28 14 14 55 31.3200 -97.3300 251.000 457.0 111.266 2.770 -999.990 -999.990 1.113 ..P WKT 2010 10 28 14 19 55 31.3200 -97.3300 251.000 30.0 124.895 3.470 -999.990 -999.990 1.249 ..P WKT 2010 10 28 14 24 55 31.3200 -97.3300 251.000 122.0 129.096 2.870 -999.990 -999.990 1.291 ..P WKT 2010 10 28 14 29 55 31.3200 -97.3300 251.000 457.0 108.772 2.350 -999.990 -999.990 1.088 ..P WKT 2010 10 28 14 39 55 31.3200 -97.3300 251.000 30.0 127.537 2.470 -999.990 -999.990 1.275 ..P WKT 2010 10 28 14 44 55 31.3200 -97.3300 251.000 122.0 128.353 5.390 -999.990 -999.990 1.284 ..P WKT 2010 10 28 14 49 55 31.3200 -97.3300 251.000 457.0 111.902 3.720 -999.990 -999.990 1.119 ..P WKT 2010 10 28 14 54 55 31.3200 -97.3300 251.000 30.0 123.104 4.330 -999.990 -999.990 1.231 ..P WKT 2010 10 28 14 59 55 31.3200 -97.3300 251.000 122.0 122.030 3.770 -999.990 -999.990 1.220 ..P WKT 2010 10 28 15 04 55 31.3200 -97.3300 251.000 457.0 101.787 3.430 -999.990 -999.990 1.018 ..P WKT 2010 10 28 15 14 55 31.3200 -97.3300 251.000 30.0 121.119 3.190 -999.990 -999.990 1.211 ..P WKT 2010 10 28 15 19 55 31.3200 -97.3300 251.000 122.0 118.442 3.280 -999.990 -999.990 1.184 ..P WKT 2010 10 28 15 24 55 31.3200 -97.3300 251.000 457.0 108.738 3.710 -999.990 -999.990 1.087 ..P WKT 2010 10 28 15 29 55 31.3200 -97.3300 251.000 30.0 113.625 2.890 -999.990 -999.990 1.136 ..P WKT 2010 10 28 15 34 55 31.3200 -97.3300 251.000 122.0 117.972 4.870 -999.990 -999.990 1.180 ..P WKT 2010 10 28 15 39 55 31.3200 -97.3300 251.000 457.0 107.585 3.070 -999.990 -999.990 1.076 ..P WKT 2010 10 28 15 49 55 31.3200 -97.3300 251.000 30.0 114.236 3.090 -999.990 -999.990 1.142 ..P WKT 2010 10 28 15 54 55 31.3200 -97.3300 251.000 122.0 123.575 4.170 -999.990 -999.990 1.236 ..P WKT 2010 10 28 15 59 55 31.3200 -97.3300 251.000 457.0 121.280 3.570 -999.990 -999.990 1.213 ..P WKT 2010 10 28 16 04 55 31.3200 -97.3300 251.000 30.0 119.255 4.360 -999.990 -999.990 1.193 ..P WKT 2010 10 28 16 09 55 31.3200 -97.3300 251.000 122.0 121.289 3.690 -999.990 -999.990 1.213 ..P WKT 2010 10 28 16 14 55 31.3200 -97.3300 251.000 457.0 120.888 3.190 -999.990 -999.990 1.209 ..P WKT 2010 10 28 16 24 55 31.3200 -97.3300 251.000 30.0 119.156 4.050 -999.990 -999.990 1.192 ..P WKT 2010 10 28 16 29 55 31.3200 -97.3300 251.000 122.0 118.774 3.540 -999.990 -999.990 1.188 ..P WKT 2010 10 28 16 34 55 31.3200 -97.3300 251.000 457.0 116.359 3.760 -999.990 -999.990 1.164 ..P WKT 2010 10 28 16 39 55 31.3200 -97.3300 251.000 30.0 113.535 3.510 -999.990 -999.990 1.135 ..P WKT 2010 10 28 16 44 55 31.3200 -97.3300 251.000 122.0 126.032 3.620 -999.990 -999.990 1.260 ..P WKT 2010 10 28 16 49 55 31.3200 -97.3300 251.000 457.0 121.175 3.950 -999.990 -999.990 1.212 ..P WKT 2010 10 28 17 04 55 31.3200 -97.3300 251.000 30.0 111.642 3.610 -999.990 -999.990 1.116 ..P WKT 2010 10 28 17 09 55 31.3200 -97.3300 251.000 122.0 113.784 3.580 -999.990 -999.990 1.138 ..P WKT 2010 10 28 17 14 55 31.3200 -97.3300 251.000 457.0 107.779 4.770 -999.990 -999.990 1.078 ..P WKT 2010 10 28 17 19 55 31.3200 -97.3300 251.000 30.0 118.611 5.740 -999.990 -999.990 1.186 ..P WKT 2010 10 28 17 24 55 31.3200 -97.3300 251.000 122.0 113.148 4.930 -999.990 -999.990 1.131 ..P WKT 2010 10 28 17 29 55 31.3200 -97.3300 251.000 457.0 119.367 3.000 -999.990 -999.990 1.194 ..P WKT 2010 10 28 17 39 55 31.3200 -97.3300 251.000 30.0 119.303 3.340 -999.990 -999.990 1.193 ..P WKT 2010 10 28 17 44 55 31.3200 -97.3300 251.000 122.0 128.786 4.260 -999.990 -999.990 1.288 ..P WKT 2010 10 28 17 49 55 31.3200 -97.3300 251.000 457.0 129.841 5.580 -999.990 -999.990 1.298 ..P WKT 2010 10 28 17 54 55 31.3200 -97.3300 251.000 30.0 133.618 5.210 -999.990 -999.990 1.336 ..P WKT 2010 10 28 17 59 55 31.3200 -97.3300 251.000 122.0 140.933 4.760 -999.990 -999.990 1.409 ..P WKT 2010 10 28 18 04 55 31.3200 -97.3300 251.000 457.0 133.556 3.470 -999.990 -999.990 1.336 ..P WKT 2010 10 28 18 14 55 31.3200 -97.3300 251.000 30.0 142.400 3.840 -999.990 -999.990 1.424 ..P WKT 2010 10 28 18 19 55 31.3200 -97.3300 251.000 122.0 146.650 5.500 -999.990 -999.990 1.467 ..P WKT 2010 10 28 18 24 55 31.3200 -97.3300 251.000 457.0 137.011 5.870 -999.990 -999.990 1.370 ..P WKT 2010 10 28 18 29 55 31.3200 -97.3300 251.000 30.0 142.352 4.630 -999.990 -999.990 1.424 ..P WKT 2010 10 28 18 34 55 31.3200 -97.3300 251.000 122.0 135.977 3.590 -999.990 -999.990 1.360 ..P WKT 2010 10 28 18 39 55 31.3200 -97.3300 251.000 457.0 134.233 3.680 -999.990 -999.990 1.342 ..P WKT 2010 10 28 18 49 55 31.3200 -97.3300 251.000 30.0 132.945 3.630 -999.990 -999.990 1.329 ..P WKT 2010 10 28 18 54 55 31.3200 -97.3300 251.000 122.0 122.491 3.950 -999.990 -999.990 1.225 ..P WKT 2010 10 28 18 59 55 31.3200 -97.3300 251.000 457.0 127.445 4.270 -999.990 -999.990 1.274 ..P WKT 2010 10 28 19 04 55 31.3200 -97.3300 251.000 30.0 113.302 3.920 -999.990 -999.990 1.133 ..P WKT 2010 10 28 19 09 55 31.3200 -97.3300 251.000 122.0 107.068 4.770 -999.990 -999.990 1.071 ..P WKT 2010 10 28 19 14 55 31.3200 -97.3300 251.000 457.0 115.434 4.190 -999.990 -999.990 1.154 ..P WKT 2010 10 28 19 24 55 31.3200 -97.3300 251.000 30.0 113.862 4.060 -999.990 -999.990 1.139 ..P WKT 2010 10 28 19 29 55 31.3200 -97.3300 251.000 122.0 113.065 4.670 -999.990 -999.990 1.131 ..P WKT 2010 10 28 19 34 55 31.3200 -97.3300 251.000 457.0 111.722 5.390 -999.990 -999.990 1.117 ..P WKT 2010 10 28 19 39 55 31.3200 -97.3300 251.000 30.0 111.881 4.170 -999.990 -999.990 1.119 ..P WKT 2010 10 28 19 44 55 31.3200 -97.3300 251.000 122.0 110.947 4.220 -999.990 -999.990 1.109 ..P WKT 2010 10 28 19 49 55 31.3200 -97.3300 251.000 457.0 115.617 5.210 -999.990 -999.990 1.156 ..P WKT 2010 10 28 19 59 55 31.3200 -97.3300 251.000 30.0 115.390 5.810 -999.990 -999.990 1.154 ..P WKT 2010 10 28 20 04 55 31.3200 -97.3300 251.000 122.0 116.919 6.160 -999.990 -999.990 1.169 ..P WKT 2010 10 28 20 09 55 31.3200 -97.3300 251.000 457.0 113.384 4.710 -999.990 -999.990 1.134 ..P WKT 2010 10 28 20 14 55 31.3200 -97.3300 251.000 30.0 113.134 4.290 -999.990 -999.990 1.131 ..P WKT 2010 10 28 20 19 55 31.3200 -97.3300 251.000 122.0 120.275 4.730 -999.990 -999.990 1.203 ..P WKT 2010 10 28 20 24 55 31.3200 -97.3300 251.000 457.0 113.728 4.390 -999.990 -999.990 1.137 ..P WKT 2010 10 28 20 34 55 31.3200 -97.3300 251.000 30.0 114.752 4.820 -999.990 -999.990 1.148 ..P WKT 2010 10 28 20 39 55 31.3200 -97.3300 251.000 122.0 119.727 3.950 -999.990 -999.990 1.197 ..P WKT 2010 10 28 20 44 55 31.3200 -97.3300 251.000 457.0 122.101 4.080 -999.990 -999.990 1.221 ..P WKT 2010 10 28 20 49 55 31.3200 -97.3300 251.000 30.0 117.073 3.830 -999.990 -999.990 1.171 ..P WKT 2010 10 28 20 54 55 31.3200 -97.3300 251.000 122.0 121.915 3.740 -999.990 -999.990 1.219 ..P WKT 2010 10 28 20 59 55 31.3200 -97.3300 251.000 457.0 121.274 3.430 -999.990 -999.990 1.213 ..P WKT 2010 10 28 21 09 55 31.3200 -97.3300 251.000 30.0 117.424 3.510 -999.990 -999.990 1.174 ..P WKT 2010 10 28 21 14 55 31.3200 -97.3300 251.000 122.0 115.036 3.560 -999.990 -999.990 1.150 ..P WKT 2010 10 28 21 19 55 31.3200 -97.3300 251.000 457.0 116.491 4.380 -999.990 -999.990 1.165 ..P WKT 2010 10 28 21 24 55 31.3200 -97.3300 251.000 30.0 115.475 4.750 -999.990 -999.990 1.155 ..P WKT 2010 10 28 21 29 55 31.3200 -97.3300 251.000 122.0 120.501 3.810 -999.990 -999.990 1.205 ..P WKT 2010 10 28 21 34 55 31.3200 -97.3300 251.000 457.0 114.542 3.810 -999.990 -999.990 1.145 ..P WKT 2010 10 28 21 44 55 31.3200 -97.3300 251.000 30.0 121.968 5.420 -999.990 -999.990 1.220 ..P WKT 2010 10 28 21 49 55 31.3200 -97.3300 251.000 122.0 121.895 4.170 -999.990 -999.990 1.219 ..P WKT 2010 10 28 21 54 55 31.3200 -97.3300 251.000 457.0 122.097 5.320 -999.990 -999.990 1.221 ..P WKT 2010 10 28 21 59 55 31.3200 -97.3300 251.000 30.0 115.425 4.380 -999.990 -999.990 1.154 ..P WKT 2010 10 28 22 04 55 31.3200 -97.3300 251.000 122.0 118.926 4.620 -999.990 -999.990 1.189 ..P WKT 2010 10 28 22 09 55 31.3200 -97.3300 251.000 457.0 120.778 4.440 -999.990 -999.990 1.208 ..P WKT 2010 10 28 22 19 55 31.3200 -97.3300 251.000 30.0 117.465 5.000 -999.990 -999.990 1.175 ..P WKT 2010 10 28 22 24 55 31.3200 -97.3300 251.000 122.0 116.152 4.520 -999.990 -999.990 1.162 ..P WKT 2010 10 28 22 29 55 31.3200 -97.3300 251.000 457.0 114.976 6.020 -999.990 -999.990 1.150 ..P WKT 2010 10 28 22 34 55 31.3200 -97.3300 251.000 30.0 111.183 6.810 -999.990 -999.990 1.112 ..P WKT 2010 10 28 22 39 55 31.3200 -97.3300 251.000 122.0 116.479 6.160 -999.990 -999.990 1.165 ..P WKT 2010 10 28 22 44 55 31.3200 -97.3300 251.000 457.0 111.582 4.860 -999.990 -999.990 1.116 ..P WKT 2010 10 28 22 54 55 31.3200 -97.3300 251.000 30.0 114.660 5.100 -999.990 -999.990 1.147 ..P WKT 2010 10 28 22 59 55 31.3200 -97.3300 251.000 122.0 115.334 6.570 -999.990 -999.990 1.153 ..P WKT 2010 10 28 23 04 55 31.3200 -97.3300 251.000 457.0 113.112 6.770 -999.990 -999.990 1.131 ..P WKT 2010 10 28 23 09 55 31.3200 -97.3300 251.000 30.0 113.096 7.330 -999.990 -999.990 1.131 ..P WKT 2010 10 28 23 14 55 31.3200 -97.3300 251.000 122.0 124.667 6.520 -999.990 -999.990 1.247 ..P WKT 2010 10 28 23 19 55 31.3200 -97.3300 251.000 457.0 121.618 5.540 -999.990 -999.990 1.216 ..P WKT 2010 10 28 23 29 55 31.3200 -97.3300 251.000 30.0 125.819 5.440 -999.990 -999.990 1.258 ..P WKT 2010 10 28 23 34 55 31.3200 -97.3300 251.000 122.0 120.095 6.220 -999.990 -999.990 1.201 ..P WKT 2010 10 28 23 39 55 31.3200 -97.3300 251.000 457.0 123.208 7.620 -999.990 -999.990 1.232 ..P WKT 2010 10 28 23 44 55 31.3200 -97.3300 251.000 30.0 120.658 7.530 -999.990 -999.990 1.207 ..P WKT 2010 10 28 23 49 55 31.3200 -97.3300 251.000 122.0 121.976 5.780 -999.990 -999.990 1.220 ..P WKT 2010 10 29 00 09 55 31.3200 -97.3300 251.000 457.0 111.265 4.970 -999.990 -999.990 1.113 ..P WKT 2010 10 29 00 10 25 31.3200 -97.3300 251.000 457.0 110.309 4.210 -999.990 -999.990 1.103 ..P WKT 2010 10 29 00 10 55 31.3200 -97.3300 251.000 457.0 117.094 5.510 -999.990 -999.990 1.171 ..P WKT 2010 10 29 00 11 25 31.3200 -97.3300 251.000 457.0 114.894 5.110 -999.990 -999.990 1.149 ..P WKT 2010 10 29 00 11 55 31.3200 -97.3300 251.000 457.0 116.150 4.700 -999.990 -999.990 1.161 ..P WKT 2010 10 29 00 12 25 31.3200 -97.3300 251.000 457.0 117.682 4.690 -999.990 -999.990 1.177 ..P WKT 2010 10 29 00 12 55 31.3200 -97.3300 251.000 457.0 116.589 4.560 -999.990 -999.990 1.166 ..P WKT 2010 10 29 00 13 25 31.3200 -97.3300 251.000 457.0 110.520 5.080 -999.990 -999.990 1.105 ..P WKT 2010 10 29 00 13 55 31.3200 -97.3300 251.000 457.0 114.955 4.910 -999.990 -999.990 1.150 ..P WKT 2010 10 29 00 14 25 31.3200 -97.3300 251.000 457.0 113.032 4.650 -999.990 -999.990 1.130 ..P WKT 2010 10 29 00 14 55 31.3200 -97.3300 251.000 457.0 112.491 4.620 -999.990 -999.990 1.125 ..P WKT 2010 10 29 00 19 55 31.3200 -97.3300 251.000 30.0 114.546 4.940 -999.990 -999.990 1.145 ..P WKT 2010 10 29 00 24 55 31.3200 -97.3300 251.000 122.0 114.666 5.350 -999.990 -999.990 1.147 ..P WKT 2010 10 29 00 29 55 31.3200 -97.3300 251.000 457.0 112.576 4.930 -999.990 -999.990 1.126 ..P WKT 2010 10 29 00 34 55 31.3200 -97.3300 251.000 30.0 112.972 4.580 -999.990 -999.990 1.130 ..P WKT 2010 10 29 00 39 55 31.3200 -97.3300 251.000 122.0 118.344 4.310 -999.990 -999.990 1.183 ..P WKT 2010 10 29 00 44 55 31.3200 -97.3300 251.000 457.0 112.108 4.570 -999.990 -999.990 1.121 ..P WKT 2010 10 29 00 54 55 31.3200 -97.3300 251.000 30.0 120.714 4.450 -999.990 -999.990 1.207 ..P WKT 2010 10 29 00 59 55 31.3200 -97.3300 251.000 122.0 119.527 5.360 -999.990 -999.990 1.195 ..P WKT 2010 10 29 01 04 55 31.3200 -97.3300 251.000 457.0 114.194 4.630 -999.990 -999.990 1.142 ..P WKT 2010 10 29 01 09 55 31.3200 -97.3300 251.000 30.0 120.470 5.660 -999.990 -999.990 1.205 ..P WKT 2010 10 29 01 14 55 31.3200 -97.3300 251.000 122.0 123.427 4.680 -999.990 -999.990 1.234 ..P WKT 2010 10 29 01 19 55 31.3200 -97.3300 251.000 457.0 117.819 4.620 -999.990 -999.990 1.178 ..P WKT 2010 10 29 01 29 55 31.3200 -97.3300 251.000 30.0 125.985 5.910 -999.990 -999.990 1.260 ..P WKT 2010 10 29 01 34 55 31.3200 -97.3300 251.000 122.0 121.798 5.310 -999.990 -999.990 1.218 ..P WKT 2010 10 29 01 39 55 31.3200 -97.3300 251.000 457.0 130.322 5.860 -999.990 -999.990 1.303 ..P WKT 2010 10 29 01 44 55 31.3200 -97.3300 251.000 30.0 120.056 5.910 -999.990 -999.990 1.201 ..P WKT 2010 10 29 01 49 55 31.3200 -97.3300 251.000 122.0 130.514 6.250 -999.990 -999.990 1.305 ..P WKT 2010 10 29 01 54 55 31.3200 -97.3300 251.000 457.0 123.840 5.770 -999.990 -999.990 1.238 ..P WKT 2010 10 29 02 04 55 31.3200 -97.3300 251.000 30.0 122.690 5.600 -999.990 -999.990 1.227 ..P WKT 2010 10 29 02 09 55 31.3200 -97.3300 251.000 122.0 130.423 5.840 -999.990 -999.990 1.304 ..P WKT 2010 10 29 02 14 55 31.3200 -97.3300 251.000 457.0 129.038 5.290 -999.990 -999.990 1.290 ..P WKT 2010 10 29 02 19 55 31.3200 -97.3300 251.000 30.0 119.919 5.060 -999.990 -999.990 1.199 ..P WKT 2010 10 29 02 24 55 31.3200 -97.3300 251.000 122.0 130.138 5.300 -999.990 -999.990 1.301 ..P WKT 2010 10 29 02 29 55 31.3200 -97.3300 251.000 457.0 130.550 4.910 -999.990 -999.990 1.306 ..P WKT 2010 10 29 02 39 55 31.3200 -97.3300 251.000 30.0 112.885 5.820 -999.990 -999.990 1.129 ..P WKT 2010 10 29 02 44 55 31.3200 -97.3300 251.000 122.0 118.565 4.540 -999.990 -999.990 1.186 ..P WKT 2010 10 29 02 49 55 31.3200 -97.3300 251.000 457.0 130.874 4.740 -999.990 -999.990 1.309 ..P WKT 2010 10 29 02 54 55 31.3200 -97.3300 251.000 30.0 116.665 4.700 -999.990 -999.990 1.167 ..P WKT 2010 10 29 02 59 55 31.3200 -97.3300 251.000 122.0 121.654 4.540 -999.990 -999.990 1.217 ..P WKT 2010 10 29 03 04 55 31.3200 -97.3300 251.000 457.0 127.886 4.240 -999.990 -999.990 1.279 ..P WKT 2010 10 29 03 14 55 31.3200 -97.3300 251.000 30.0 109.041 4.950 -999.990 -999.990 1.090 ..P WKT 2010 10 29 03 19 55 31.3200 -97.3300 251.000 122.0 124.011 4.280 -999.990 -999.990 1.240 ..P WKT 2010 10 29 03 24 55 31.3200 -97.3300 251.000 457.0 130.834 4.560 -999.990 -999.990 1.308 ..P WKT 2010 10 29 03 29 55 31.3200 -97.3300 251.000 30.0 115.010 4.250 -999.990 -999.990 1.150 ..P WKT 2010 10 29 03 34 55 31.3200 -97.3300 251.000 122.0 128.184 4.320 -999.990 -999.990 1.282 ..P WKT 2010 10 29 03 39 55 31.3200 -97.3300 251.000 457.0 124.927 4.420 -999.990 -999.990 1.249 ..P WKT 2010 10 29 03 49 55 31.3200 -97.3300 251.000 30.0 124.291 4.900 -999.990 -999.990 1.243 ..P WKT 2010 10 29 03 54 55 31.3200 -97.3300 251.000 122.0 138.232 4.330 -999.990 -999.990 1.382 ..P WKT 2010 10 29 03 59 55 31.3200 -97.3300 251.000 457.0 122.076 5.100 -999.990 -999.990 1.221 ..P WKT 2010 10 29 04 04 55 31.3200 -97.3300 251.000 30.0 121.659 5.680 -999.990 -999.990 1.217 ..P WKT 2010 10 29 04 09 55 31.3200 -97.3300 251.000 122.0 136.566 4.720 -999.990 -999.990 1.366 ..P WKT 2010 10 29 04 14 55 31.3200 -97.3300 251.000 457.0 124.415 4.510 -999.990 -999.990 1.244 ..P WKT 2010 10 29 04 24 55 31.3200 -97.3300 251.000 30.0 127.269 4.640 -999.990 -999.990 1.273 ..P WKT 2010 10 29 04 29 55 31.3200 -97.3300 251.000 122.0 137.717 5.050 -999.990 -999.990 1.377 ..P WKT 2010 10 29 04 34 55 31.3200 -97.3300 251.000 457.0 122.492 4.870 -999.990 -999.990 1.225 ..P WKT 2010 10 29 04 39 55 31.3200 -97.3300 251.000 30.0 131.007 4.450 -999.990 -999.990 1.310 ..P WKT 2010 10 29 04 44 55 31.3200 -97.3300 251.000 122.0 135.658 4.970 -999.990 -999.990 1.357 ..P WKT 2010 10 29 04 49 55 31.3200 -97.3300 251.000 457.0 126.782 4.520 -999.990 -999.990 1.268 ..P WKT 2010 10 29 05 04 55 31.3200 -97.3300 251.000 30.0 123.145 4.850 -999.990 -999.990 1.231 ..P WKT 2010 10 29 05 09 55 31.3200 -97.3300 251.000 122.0 133.632 5.030 -999.990 -999.990 1.336 ..P WKT 2010 10 29 05 14 55 31.3200 -97.3300 251.000 457.0 117.343 4.900 -999.990 -999.990 1.173 ..P WKT 2010 10 29 05 19 55 31.3200 -97.3300 251.000 30.0 126.174 4.510 -999.990 -999.990 1.262 ..P WKT 2010 10 29 05 24 55 31.3200 -97.3300 251.000 122.0 141.903 4.930 -999.990 -999.990 1.419 ..P WKT 2010 10 29 05 29 55 31.3200 -97.3300 251.000 457.0 114.576 4.900 -999.990 -999.990 1.146 ..P WKT 2010 10 29 05 39 55 31.3200 -97.3300 251.000 30.0 136.768 4.570 -999.990 -999.990 1.368 ..P WKT 2010 10 29 05 44 55 31.3200 -97.3300 251.000 122.0 144.610 4.800 -999.990 -999.990 1.446 ..P WKT 2010 10 29 05 49 55 31.3200 -97.3300 251.000 457.0 120.716 5.100 -999.990 -999.990 1.207 ..P WKT 2010 10 29 05 54 55 31.3200 -97.3300 251.000 30.0 139.874 4.370 -999.990 -999.990 1.399 ..P WKT 2010 10 29 05 59 55 31.3200 -97.3300 251.000 122.0 144.127 4.460 -999.990 -999.990 1.441 ..P WKT 2010 10 29 06 04 55 31.3200 -97.3300 251.000 457.0 115.268 4.450 -999.990 -999.990 1.153 ..P WKT 2010 10 29 06 14 55 31.3200 -97.3300 251.000 30.0 128.311 4.900 -999.990 -999.990 1.283 ..P WKT 2010 10 29 06 19 55 31.3200 -97.3300 251.000 122.0 136.271 4.470 -999.990 -999.990 1.363 ..P WKT 2010 10 29 06 24 55 31.3200 -97.3300 251.000 457.0 114.292 4.630 -999.990 -999.990 1.143 ..P WKT 2010 10 29 06 29 55 31.3200 -97.3300 251.000 30.0 135.496 5.720 -999.990 -999.990 1.355 ..P WKT 2010 10 29 06 34 55 31.3200 -97.3300 251.000 122.0 127.866 5.130 -999.990 -999.990 1.279 ..P WKT 2010 10 29 06 39 55 31.3200 -97.3300 251.000 457.0 118.581 4.520 -999.990 -999.990 1.186 ..P WKT 2010 10 29 06 49 55 31.3200 -97.3300 251.000 30.0 138.677 5.350 -999.990 -999.990 1.387 ..P WKT 2010 10 29 06 54 55 31.3200 -97.3300 251.000 122.0 125.293 5.010 -999.990 -999.990 1.253 ..P WKT 2010 10 29 06 59 55 31.3200 -97.3300 251.000 457.0 118.531 4.290 -999.990 -999.990 1.185 ..P WKT 2010 10 29 07 04 55 31.3200 -97.3300 251.000 30.0 136.460 4.410 -999.990 -999.990 1.365 ..P WKT 2010 10 29 07 09 55 31.3200 -97.3300 251.000 122.0 117.837 5.120 -999.990 -999.990 1.178 ..P WKT 2010 10 29 07 14 55 31.3200 -97.3300 251.000 457.0 111.352 4.550 -999.990 -999.990 1.114 ..P WKT 2010 10 29 07 24 55 31.3200 -97.3300 251.000 30.0 131.681 4.620 -999.990 -999.990 1.317 ..P WKT 2010 10 29 07 29 55 31.3200 -97.3300 251.000 122.0 117.531 4.540 -999.990 -999.990 1.175 ..P WKT 2010 10 29 07 34 55 31.3200 -97.3300 251.000 457.0 114.830 4.730 -999.990 -999.990 1.148 ..P WKT 2010 10 29 07 39 55 31.3200 -97.3300 251.000 30.0 134.332 5.000 -999.990 -999.990 1.343 ..P WKT 2010 10 29 07 44 55 31.3200 -97.3300 251.000 122.0 127.354 5.330 -999.990 -999.990 1.274 ..P WKT 2010 10 29 07 49 55 31.3200 -97.3300 251.000 457.0 123.411 5.150 -999.990 -999.990 1.234 ..P WKT 2010 10 29 07 59 55 31.3200 -97.3300 251.000 30.0 140.564 5.630 -999.990 -999.990 1.406 ..P WKT 2010 10 29 08 04 55 31.3200 -97.3300 251.000 122.0 127.737 5.490 -999.990 -999.990 1.277 ..P WKT 2010 10 29 08 09 55 31.3200 -97.3300 251.000 457.0 119.736 5.550 -999.990 -999.990 1.197 ..P WKT 2010 10 29 08 14 55 31.3200 -97.3300 251.000 30.0 138.073 5.260 -999.990 -999.990 1.381 ..P WKT 2010 10 29 08 19 55 31.3200 -97.3300 251.000 122.0 140.138 5.770 -999.990 -999.990 1.401 ..P WKT 2010 10 29 08 24 55 31.3200 -97.3300 251.000 457.0 117.109 4.610 -999.990 -999.990 1.171 ..P WKT 2010 10 29 08 34 55 31.3200 -97.3300 251.000 30.0 129.493 4.360 -999.990 -999.990 1.295 ..P WKT 2010 10 29 08 39 55 31.3200 -97.3300 251.000 122.0 138.432 4.210 -999.990 -999.990 1.384 ..P WKT 2010 10 29 08 44 55 31.3200 -97.3300 251.000 457.0 117.867 4.190 -999.990 -999.990 1.179 ..P WKT 2010 10 29 08 49 55 31.3200 -97.3300 251.000 30.0 132.320 4.290 -999.990 -999.990 1.323 ..P WKT 2010 10 29 08 54 55 31.3200 -97.3300 251.000 122.0 133.539 4.070 -999.990 -999.990 1.335 ..P WKT 2010 10 29 08 59 55 31.3200 -97.3300 251.000 457.0 111.873 4.300 -999.990 -999.990 1.119 ..P WKT 2010 10 29 09 09 55 31.3200 -97.3300 251.000 30.0 133.569 4.340 -999.990 -999.990 1.336 ..P WKT 2010 10 29 09 14 55 31.3200 -97.3300 251.000 122.0 131.164 4.440 -999.990 -999.990 1.312 ..P WKT 2010 10 29 09 19 55 31.3200 -97.3300 251.000 457.0 109.185 4.310 -999.990 -999.990 1.092 ..P WKT 2010 10 29 09 24 55 31.3200 -97.3300 251.000 30.0 134.624 5.060 -999.990 -999.990 1.346 ..P WKT 2010 10 29 09 29 55 31.3200 -97.3300 251.000 122.0 126.153 4.580 -999.990 -999.990 1.262 ..P WKT 2010 10 29 09 34 55 31.3200 -97.3300 251.000 457.0 108.863 5.670 -999.990 -999.990 1.089 ..P WKT 2010 10 29 09 44 55 31.3200 -97.3300 251.000 30.0 138.668 4.310 -999.990 -999.990 1.387 ..P WKT 2010 10 29 09 49 55 31.3200 -97.3300 251.000 122.0 124.843 4.580 -999.990 -999.990 1.248 ..P WKT 2010 10 29 09 54 55 31.3200 -97.3300 251.000 457.0 118.186 4.450 -999.990 -999.990 1.182 ..P WKT 2010 10 29 09 59 55 31.3200 -97.3300 251.000 30.0 141.297 5.290 -999.990 -999.990 1.413 ..P WKT 2010 10 29 10 04 55 31.3200 -97.3300 251.000 122.0 124.166 4.640 -999.990 -999.990 1.242 ..P WKT 2010 10 29 10 09 55 31.3200 -97.3300 251.000 457.0 126.053 4.470 -999.990 -999.990 1.261 ..P WKT 2010 10 29 10 19 55 31.3200 -97.3300 251.000 30.0 144.769 4.430 -999.990 -999.990 1.448 ..P WKT 2010 10 29 10 24 55 31.3200 -97.3300 251.000 122.0 129.352 5.650 -999.990 -999.990 1.294 ..P WKT 2010 10 29 10 29 55 31.3200 -97.3300 251.000 457.0 119.172 4.840 -999.990 -999.990 1.192 ..P WKT 2010 10 29 10 34 55 31.3200 -97.3300 251.000 30.0 139.995 4.720 -999.990 -999.990 1.400 ..P WKT 2010 10 29 10 39 55 31.3200 -97.3300 251.000 122.0 121.962 4.570 -999.990 -999.990 1.220 ..P WKT 2010 10 29 10 44 55 31.3200 -97.3300 251.000 457.0 123.356 4.360 -999.990 -999.990 1.234 ..P WKT 2010 10 29 10 54 55 31.3200 -97.3300 251.000 30.0 145.101 4.460 -999.990 -999.990 1.451 ..P WKT 2010 10 29 10 59 55 31.3200 -97.3300 251.000 122.0 134.311 5.630 -999.990 -999.990 1.343 ..P WKT 2010 10 29 11 04 55 31.3200 -97.3300 251.000 457.0 116.083 4.560 -999.990 -999.990 1.161 ..P WKT 2010 10 29 11 09 55 31.3200 -97.3300 251.000 30.0 130.369 5.530 -999.990 -999.990 1.304 ..P WKT 2010 10 29 11 14 55 31.3200 -97.3300 251.000 122.0 119.719 4.990 -999.990 -999.990 1.197 ..P WKT 2010 10 29 11 19 55 31.3200 -97.3300 251.000 457.0 106.590 4.990 -999.990 -999.990 1.066 ..P WKT 2010 10 29 11 29 55 31.3200 -97.3300 251.000 30.0 135.973 5.060 -999.990 -999.990 1.360 ..P WKT 2010 10 29 11 34 55 31.3200 -97.3300 251.000 122.0 122.970 5.210 -999.990 -999.990 1.230 ..P WKT 2010 10 29 11 39 55 31.3200 -97.3300 251.000 457.0 119.196 5.730 -999.990 -999.990 1.192 ..P WKT 2010 10 29 11 44 55 31.3200 -97.3300 251.000 30.0 137.049 5.880 -999.990 -999.990 1.370 ..P WKT 2010 10 29 11 49 55 31.3200 -97.3300 251.000 122.0 129.557 4.860 -999.990 -999.990 1.296 ..P WKT 2010 10 29 12 09 55 31.3200 -97.3300 251.000 457.0 119.158 7.590 -999.990 -999.990 1.192 ..P WKT 2010 10 29 12 10 25 31.3200 -97.3300 251.000 457.0 115.668 5.680 -999.990 -999.990 1.157 ..P WKT 2010 10 29 12 10 55 31.3200 -97.3300 251.000 457.0 120.028 4.380 -999.990 -999.990 1.200 ..P WKT 2010 10 29 12 11 25 31.3200 -97.3300 251.000 457.0 116.676 5.270 -999.990 -999.990 1.167 ..P WKT 2010 10 29 12 11 55 31.3200 -97.3300 251.000 457.0 111.946 5.540 -999.990 -999.990 1.119 ..P WKT 2010 10 29 12 12 25 31.3200 -97.3300 251.000 457.0 112.312 5.400 -999.990 -999.990 1.123 ..P WKT 2010 10 29 12 12 55 31.3200 -97.3300 251.000 457.0 119.013 4.510 -999.990 -999.990 1.190 ..P WKT 2010 10 29 12 13 25 31.3200 -97.3300 251.000 457.0 115.386 4.510 -999.990 -999.990 1.154 ..P WKT 2010 10 29 12 13 55 31.3200 -97.3300 251.000 457.0 114.513 4.350 -999.990 -999.990 1.145 ..P WKT 2010 10 29 12 14 25 31.3200 -97.3300 251.000 457.0 115.429 4.340 -999.990 -999.990 1.154 ..P WKT 2010 10 29 12 14 55 31.3200 -97.3300 251.000 457.0 114.969 4.390 -999.990 -999.990 1.150 ..P WKT 2010 10 29 12 19 55 31.3200 -97.3300 251.000 30.0 131.711 4.690 -999.990 -999.990 1.317 ..P WKT 2010 10 29 12 24 55 31.3200 -97.3300 251.000 122.0 131.376 4.820 -999.990 -999.990 1.314 ..P WKT 2010 10 29 12 29 55 31.3200 -97.3300 251.000 457.0 119.891 4.530 -999.990 -999.990 1.199 ..P WKT 2010 10 29 12 34 55 31.3200 -97.3300 251.000 30.0 144.200 4.370 -999.990 -999.990 1.442 ..P WKT 2010 10 29 12 39 55 31.3200 -97.3300 251.000 122.0 128.310 5.210 -999.990 -999.990 1.283 ..P WKT 2010 10 29 12 44 55 31.3200 -97.3300 251.000 457.0 112.698 3.970 -999.990 -999.990 1.127 ..P WKT 2010 10 29 12 54 55 31.3200 -97.3300 251.000 30.0 132.719 4.260 -999.990 -999.990 1.327 ..P WKT 2010 10 29 12 59 55 31.3200 -97.3300 251.000 122.0 126.509 4.080 -999.990 -999.990 1.265 ..P WKT 2010 10 29 13 04 55 31.3200 -97.3300 251.000 457.0 110.392 4.180 -999.990 -999.990 1.104 ..P WKT 2010 10 29 13 09 55 31.3200 -97.3300 251.000 30.0 136.659 4.410 -999.990 -999.990 1.367 ..P WKT 2010 10 29 13 14 55 31.3200 -97.3300 251.000 122.0 124.946 4.520 -999.990 -999.990 1.249 ..P WKT 2010 10 29 13 19 55 31.3200 -97.3300 251.000 457.0 112.135 4.230 -999.990 -999.990 1.121 ..P WKT 2010 10 29 13 29 55 31.3200 -97.3300 251.000 30.0 137.101 4.500 -999.990 -999.990 1.371 ..P WKT 2010 10 29 13 34 55 31.3200 -97.3300 251.000 122.0 131.679 4.580 -999.990 -999.990 1.317 ..P WKT 2010 10 29 13 39 55 31.3200 -97.3300 251.000 457.0 113.880 5.050 -999.990 -999.990 1.139 ..P WKT 2010 10 29 13 44 55 31.3200 -97.3300 251.000 30.0 142.019 5.560 -999.990 -999.990 1.420 ..P WKT 2010 10 29 13 49 55 31.3200 -97.3300 251.000 122.0 122.572 5.110 -999.990 -999.990 1.226 ..P WKT 2010 10 29 13 54 55 31.3200 -97.3300 251.000 457.0 117.153 5.180 -999.990 -999.990 1.172 ..P WKT 2010 10 29 14 04 55 31.3200 -97.3300 251.000 30.0 145.955 5.840 -999.990 -999.990 1.460 ..P WKT 2010 10 29 14 09 55 31.3200 -97.3300 251.000 122.0 129.302 4.660 -999.990 -999.990 1.293 ..P WKT 2010 10 29 14 14 55 31.3200 -97.3300 251.000 457.0 112.651 5.480 -999.990 -999.990 1.127 ..P WKT 2010 10 29 14 19 55 31.3200 -97.3300 251.000 30.0 137.928 4.990 -999.990 -999.990 1.379 ..P WKT 2010 10 29 14 24 55 31.3200 -97.3300 251.000 122.0 130.626 4.170 -999.990 -999.990 1.306 ..P WKT 2010 10 29 14 29 55 31.3200 -97.3300 251.000 457.0 109.031 3.810 -999.990 -999.990 1.090 ..P WKT 2010 10 29 14 39 55 31.3200 -97.3300 251.000 30.0 138.782 4.730 -999.990 -999.990 1.388 ..P WKT 2010 10 29 14 44 55 31.3200 -97.3300 251.000 122.0 131.854 5.000 -999.990 -999.990 1.319 ..P WKT 2010 10 29 14 49 55 31.3200 -97.3300 251.000 457.0 113.386 4.390 -999.990 -999.990 1.134 ..P WKT 2010 10 29 14 54 55 31.3200 -97.3300 251.000 30.0 143.283 4.580 -999.990 -999.990 1.433 ..P WKT 2010 10 29 14 59 55 31.3200 -97.3300 251.000 122.0 138.280 5.940 -999.990 -999.990 1.383 ..P WKT 2010 10 29 15 04 55 31.3200 -97.3300 251.000 457.0 109.787 4.900 -999.990 -999.990 1.098 ..P WKT 2010 10 29 15 14 55 31.3200 -97.3300 251.000 30.0 138.503 5.840 -999.990 -999.990 1.385 ..P WKT 2010 10 29 15 19 55 31.3200 -97.3300 251.000 122.0 146.531 5.200 -999.990 -999.990 1.465 ..P WKT 2010 10 29 15 24 55 31.3200 -97.3300 251.000 457.0 111.707 6.120 -999.990 -999.990 1.117 ..P WKT 2010 10 29 15 29 55 31.3200 -97.3300 251.000 30.0 144.729 5.840 -999.990 -999.990 1.447 ..P WKT 2010 10 29 15 34 55 31.3200 -97.3300 251.000 122.0 146.712 4.680 -999.990 -999.990 1.467 ..P WKT 2010 10 29 15 39 55 31.3200 -97.3300 251.000 457.0 132.767 4.510 -999.990 -999.990 1.328 ..P WKT 2010 10 29 15 49 55 31.3200 -97.3300 251.000 30.0 147.521 4.450 -999.990 -999.990 1.475 ..P WKT 2010 10 29 15 54 55 31.3200 -97.3300 251.000 122.0 142.169 4.240 -999.990 -999.990 1.422 ..P WKT 2010 10 29 15 59 55 31.3200 -97.3300 251.000 457.0 131.326 4.430 -999.990 -999.990 1.313 ..P WKT 2010 10 29 16 04 55 31.3200 -97.3300 251.000 30.0 127.073 4.410 -999.990 -999.990 1.271 ..P WKT 2010 10 29 16 09 55 31.3200 -97.3300 251.000 122.0 129.410 4.990 -999.990 -999.990 1.294 ..P WKT 2010 10 29 16 14 55 31.3200 -97.3300 251.000 457.0 121.727 4.090 -999.990 -999.990 1.217 ..P WKT 2010 10 29 16 24 55 31.3200 -97.3300 251.000 30.0 121.891 3.640 -999.990 -999.990 1.219 ..P WKT 2010 10 29 16 29 55 31.3200 -97.3300 251.000 122.0 123.698 3.670 -999.990 -999.990 1.237 ..P WKT 2010 10 29 16 34 55 31.3200 -97.3300 251.000 457.0 118.095 4.440 -999.990 -999.990 1.181 ..P WKT 2010 10 29 16 39 55 31.3200 -97.3300 251.000 30.0 117.432 3.900 -999.990 -999.990 1.174 ..P WKT 2010 10 29 16 44 55 31.3200 -97.3300 251.000 122.0 124.726 3.980 -999.990 -999.990 1.247 ..P WKT 2010 10 29 16 49 55 31.3200 -97.3300 251.000 457.0 118.851 3.910 -999.990 -999.990 1.189 ..P WKT 2010 10 29 17 04 55 31.3200 -97.3300 251.000 30.0 122.310 6.020 -999.990 -999.990 1.223 ..P WKT 2010 10 29 17 09 55 31.3200 -97.3300 251.000 122.0 126.702 3.950 -999.990 -999.990 1.267 ..P WKT 2010 10 29 17 14 55 31.3200 -97.3300 251.000 457.0 119.849 3.860 -999.990 -999.990 1.198 ..P WKT 2010 10 29 17 19 55 31.3200 -97.3300 251.000 30.0 117.110 5.140 -999.990 -999.990 1.171 ..P WKT 2010 10 29 17 24 55 31.3200 -97.3300 251.000 122.0 123.420 4.840 -999.990 -999.990 1.234 ..P WKT 2010 10 29 17 29 55 31.3200 -97.3300 251.000 457.0 123.972 4.740 -999.990 -999.990 1.240 ..P WKT 2010 10 29 17 39 55 31.3200 -97.3300 251.000 30.0 128.247 3.970 -999.990 -999.990 1.282 ..P WKT 2010 10 29 17 44 55 31.3200 -97.3300 251.000 122.0 138.276 4.120 -999.990 -999.990 1.383 ..P WKT 2010 10 29 17 49 55 31.3200 -97.3300 251.000 457.0 132.404 4.000 -999.990 -999.990 1.324 ..P WKT 2010 10 29 17 54 55 31.3200 -97.3300 251.000 30.0 131.741 5.220 -999.990 -999.990 1.317 ..P WKT 2010 10 29 17 59 55 31.3200 -97.3300 251.000 122.0 131.078 3.880 -999.990 -999.990 1.311 ..P WKT 2010 10 29 18 04 55 31.3200 -97.3300 251.000 457.0 130.690 4.220 -999.990 -999.990 1.307 ..P WKT 2010 10 29 18 14 55 31.3200 -97.3300 251.000 30.0 127.505 4.800 -999.990 -999.990 1.275 ..P WKT 2010 10 29 18 19 55 31.3200 -97.3300 251.000 122.0 127.997 4.040 -999.990 -999.990 1.280 ..P WKT 2010 10 29 18 24 55 31.3200 -97.3300 251.000 457.0 126.982 3.540 -999.990 -999.990 1.270 ..P WKT 2010 10 29 18 29 55 31.3200 -97.3300 251.000 30.0 127.201 3.990 -999.990 -999.990 1.272 ..P WKT 2010 10 29 18 34 55 31.3200 -97.3300 251.000 122.0 124.680 3.660 -999.990 -999.990 1.247 ..P WKT 2010 10 29 18 39 55 31.3200 -97.3300 251.000 457.0 125.036 4.460 -999.990 -999.990 1.250 ..P WKT 2010 10 29 18 49 55 31.3200 -97.3300 251.000 30.0 133.082 4.050 -999.990 -999.990 1.331 ..P WKT 2010 10 29 18 54 55 31.3200 -97.3300 251.000 122.0 124.614 3.480 -999.990 -999.990 1.246 ..P WKT 2010 10 29 18 59 55 31.3200 -97.3300 251.000 457.0 128.471 4.470 -999.990 -999.990 1.285 ..P WKT 2010 10 29 19 04 55 31.3200 -97.3300 251.000 30.0 117.130 4.520 -999.990 -999.990 1.171 ..P WKT 2010 10 29 19 09 55 31.3200 -97.3300 251.000 122.0 122.903 4.510 -999.990 -999.990 1.229 ..P WKT 2010 10 29 19 14 55 31.3200 -97.3300 251.000 457.0 115.807 3.630 -999.990 -999.990 1.158 ..P WKT 2010 10 29 19 24 55 31.3200 -97.3300 251.000 30.0 117.731 3.390 -999.990 -999.990 1.177 ..P WKT 2010 10 29 19 29 55 31.3200 -97.3300 251.000 122.0 121.958 4.070 -999.990 -999.990 1.220 ..P WKT 2010 10 29 19 34 55 31.3200 -97.3300 251.000 457.0 122.352 5.430 -999.990 -999.990 1.224 ..P WKT 2010 10 29 19 39 55 31.3200 -97.3300 251.000 30.0 125.620 3.900 -999.990 -999.990 1.256 ..P WKT 2010 10 29 19 44 55 31.3200 -97.3300 251.000 122.0 131.077 3.320 -999.990 -999.990 1.311 ..P WKT 2010 10 29 19 49 55 31.3200 -97.3300 251.000 457.0 137.492 3.470 -999.990 -999.990 1.375 ..P WKT 2010 10 29 19 59 55 31.3200 -97.3300 251.000 30.0 131.047 3.240 -999.990 -999.990 1.310 ..P WKT 2010 10 29 20 04 55 31.3200 -97.3300 251.000 122.0 135.427 4.040 -999.990 -999.990 1.354 ..P WKT 2010 10 29 20 09 55 31.3200 -97.3300 251.000 457.0 130.369 3.890 -999.990 -999.990 1.304 ..P WKT 2010 10 29 20 14 55 31.3200 -97.3300 251.000 30.0 137.347 3.180 -999.990 -999.990 1.373 ..P WKT 2010 10 29 20 19 55 31.3200 -97.3300 251.000 122.0 134.477 4.630 -999.990 -999.990 1.345 ..P WKT 2010 10 29 20 24 55 31.3200 -97.3300 251.000 457.0 134.616 3.310 -999.990 -999.990 1.346 ..P WKT 2010 10 29 20 34 55 31.3200 -97.3300 251.000 30.0 129.055 3.090 -999.990 -999.990 1.291 ..P WKT 2010 10 29 20 39 55 31.3200 -97.3300 251.000 122.0 135.113 3.400 -999.990 -999.990 1.351 ..P WKT 2010 10 29 20 44 55 31.3200 -97.3300 251.000 457.0 137.615 4.880 -999.990 -999.990 1.376 ..P WKT 2010 10 29 20 49 55 31.3200 -97.3300 251.000 30.0 139.024 3.810 -999.990 -999.990 1.390 ..P WKT 2010 10 29 20 54 55 31.3200 -97.3300 251.000 122.0 139.611 4.180 -999.990 -999.990 1.396 ..P WKT 2010 10 29 20 59 55 31.3200 -97.3300 251.000 457.0 135.826 4.440 -999.990 -999.990 1.358 ..P WKT 2010 10 29 21 09 55 31.3200 -97.3300 251.000 30.0 135.869 4.360 -999.990 -999.990 1.359 ..P WKT 2010 10 29 21 14 55 31.3200 -97.3300 251.000 122.0 133.685 4.130 -999.990 -999.990 1.337 ..P WKT 2010 10 29 21 19 55 31.3200 -97.3300 251.000 457.0 130.135 3.880 -999.990 -999.990 1.301 ..P WKT 2010 10 29 21 24 55 31.3200 -97.3300 251.000 30.0 127.678 4.900 -999.990 -999.990 1.277 ..P WKT 2010 10 29 21 29 55 31.3200 -97.3300 251.000 122.0 133.693 5.300 -999.990 -999.990 1.337 ..P WKT 2010 10 29 21 34 55 31.3200 -97.3300 251.000 457.0 124.405 3.360 -999.990 -999.990 1.244 ..P WKT 2010 10 29 21 44 55 31.3200 -97.3300 251.000 30.0 131.183 3.410 -999.990 -999.990 1.312 ..P WKT 2010 10 29 21 49 55 31.3200 -97.3300 251.000 122.0 131.401 4.110 -999.990 -999.990 1.314 ..P WKT 2010 10 29 21 54 55 31.3200 -97.3300 251.000 457.0 134.896 4.880 -999.990 -999.990 1.349 ..P WKT 2010 10 29 21 59 55 31.3200 -97.3300 251.000 30.0 129.923 4.300 -999.990 -999.990 1.299 ..P WKT 2010 10 29 22 04 55 31.3200 -97.3300 251.000 122.0 128.502 4.490 -999.990 -999.990 1.285 ..P WKT 2010 10 29 22 09 55 31.3200 -97.3300 251.000 457.0 140.053 5.770 -999.990 -999.990 1.401 ..P WKT 2010 10 29 22 19 55 31.3200 -97.3300 251.000 30.0 141.131 3.800 -999.990 -999.990 1.411 ..P WKT 2010 10 29 22 24 55 31.3200 -97.3300 251.000 122.0 139.807 3.910 -999.990 -999.990 1.398 ..P WKT 2010 10 29 22 29 55 31.3200 -97.3300 251.000 457.0 135.479 4.710 -999.990 -999.990 1.355 ..P WKT 2010 10 29 22 34 55 31.3200 -97.3300 251.000 30.0 130.060 4.390 -999.990 -999.990 1.301 ..P WKT 2010 10 29 22 39 55 31.3200 -97.3300 251.000 122.0 137.473 4.480 -999.990 -999.990 1.375 ..P WKT 2010 10 29 22 44 55 31.3200 -97.3300 251.000 457.0 125.913 4.370 -999.990 -999.990 1.259 ..P WKT 2010 10 29 22 54 55 31.3200 -97.3300 251.000 30.0 141.048 4.250 -999.990 -999.990 1.410 ..P WKT 2010 10 29 22 59 55 31.3200 -97.3300 251.000 122.0 134.714 4.380 -999.990 -999.990 1.347 ..P WKT 2010 10 29 23 04 55 31.3200 -97.3300 251.000 457.0 134.658 4.660 -999.990 -999.990 1.347 ..P WKT 2010 10 29 23 09 55 31.3200 -97.3300 251.000 30.0 135.011 3.780 -999.990 -999.990 1.350 ..P WKT 2010 10 29 23 14 55 31.3200 -97.3300 251.000 122.0 139.048 3.960 -999.990 -999.990 1.390 ..P WKT 2010 10 29 23 19 55 31.3200 -97.3300 251.000 457.0 141.311 3.720 -999.990 -999.990 1.413 ..P WKT 2010 10 29 23 29 55 31.3200 -97.3300 251.000 30.0 140.848 3.510 -999.990 -999.990 1.408 ..P WKT 2010 10 29 23 34 55 31.3200 -97.3300 251.000 122.0 143.305 2.940 -999.990 -999.990 1.433 ..P WKT 2010 10 29 23 39 55 31.3200 -97.3300 251.000 457.0 146.034 4.320 -999.990 -999.990 1.460 ..P WKT 2010 10 29 23 44 55 31.3200 -97.3300 251.000 30.0 143.581 3.200 -999.990 -999.990 1.436 ..P WKT 2010 10 29 23 49 55 31.3200 -97.3300 251.000 122.0 139.764 3.550 -999.990 -999.990 1.398 ..P WKT 2010 10 30 00 09 55 31.3200 -97.3300 251.000 457.0 127.771 2.770 -999.990 -999.990 1.278 ..P WKT 2010 10 30 00 10 25 31.3200 -97.3300 251.000 457.0 135.939 2.810 -999.990 -999.990 1.359 ..P WKT 2010 10 30 00 10 55 31.3200 -97.3300 251.000 457.0 129.384 2.930 -999.990 -999.990 1.294 ..P WKT 2010 10 30 00 11 25 31.3200 -97.3300 251.000 457.0 133.735 3.380 -999.990 -999.990 1.337 ..P WKT 2010 10 30 00 11 55 31.3200 -97.3300 251.000 457.0 129.906 2.990 -999.990 -999.990 1.299 ..P WKT 2010 10 30 00 12 25 31.3200 -97.3300 251.000 457.0 130.985 2.640 -999.990 -999.990 1.310 ..P WKT 2010 10 30 00 12 55 31.3200 -97.3300 251.000 457.0 130.973 3.990 -999.990 -999.990 1.310 ..P WKT 2010 10 30 00 13 25 31.3200 -97.3300 251.000 457.0 129.599 4.510 -999.990 -999.990 1.296 ..P WKT 2010 10 30 00 13 55 31.3200 -97.3300 251.000 457.0 133.677 2.830 -999.990 -999.990 1.337 ..P WKT 2010 10 30 00 14 25 31.3200 -97.3300 251.000 457.0 133.666 2.840 -999.990 -999.990 1.337 ..P WKT 2010 10 30 00 14 55 31.3200 -97.3300 251.000 457.0 129.019 3.030 -999.990 -999.990 1.290 ..P WKT 2010 10 30 00 19 55 31.3200 -97.3300 251.000 30.0 123.451 3.690 -999.990 -999.990 1.235 ..P WKT 2010 10 30 00 24 55 31.3200 -97.3300 251.000 122.0 132.605 2.800 -999.990 -999.990 1.326 ..P WKT 2010 10 30 00 29 55 31.3200 -97.3300 251.000 457.0 127.855 2.700 -999.990 -999.990 1.279 ..P WKT 2010 10 30 00 34 55 31.3200 -97.3300 251.000 30.0 130.738 4.190 -999.990 -999.990 1.307 ..P WKT 2010 10 30 00 39 55 31.3200 -97.3300 251.000 122.0 120.810 3.300 -999.990 -999.990 1.208 ..P WKT 2010 10 30 00 44 55 31.3200 -97.3300 251.000 457.0 127.509 3.600 -999.990 -999.990 1.275 ..P WKT 2010 10 30 00 54 55 31.3200 -97.3300 251.000 30.0 127.773 3.190 -999.990 -999.990 1.278 ..P WKT 2010 10 30 00 59 55 31.3200 -97.3300 251.000 122.0 128.971 4.650 -999.990 -999.990 1.290 ..P WKT 2010 10 30 01 04 55 31.3200 -97.3300 251.000 457.0 129.896 3.880 -999.990 -999.990 1.299 ..P WKT 2010 10 30 01 09 55 31.3200 -97.3300 251.000 30.0 116.925 4.550 -999.990 -999.990 1.169 ..P WKT 2010 10 30 01 14 55 31.3200 -97.3300 251.000 122.0 123.572 4.130 -999.990 -999.990 1.236 ..P WKT 2010 10 30 01 19 55 31.3200 -97.3300 251.000 457.0 131.035 3.120 -999.990 -999.990 1.310 ..P WKT 2010 10 30 01 29 55 31.3200 -97.3300 251.000 30.0 123.194 3.620 -999.990 -999.990 1.232 ..P WKT 2010 10 30 01 34 55 31.3200 -97.3300 251.000 122.0 122.057 3.840 -999.990 -999.990 1.221 ..P WKT 2010 10 30 01 39 55 31.3200 -97.3300 251.000 457.0 133.448 4.550 -999.990 -999.990 1.334 ..P WKT 2010 10 30 01 44 55 31.3200 -97.3300 251.000 30.0 134.488 4.690 -999.990 -999.990 1.345 ..P WKT 2010 10 30 01 49 55 31.3200 -97.3300 251.000 122.0 132.261 4.290 -999.990 -999.990 1.323 ..P WKT 2010 10 30 01 54 55 31.3200 -97.3300 251.000 457.0 136.297 3.130 -999.990 -999.990 1.363 ..P WKT 2010 10 30 02 04 55 31.3200 -97.3300 251.000 30.0 129.451 3.180 -999.990 -999.990 1.295 ..P WKT 2010 10 30 02 09 55 31.3200 -97.3300 251.000 122.0 131.503 4.280 -999.990 -999.990 1.315 ..P WKT 2010 10 30 02 14 55 31.3200 -97.3300 251.000 457.0 136.004 5.210 -999.990 -999.990 1.360 ..P WKT 2010 10 30 02 19 55 31.3200 -97.3300 251.000 30.0 126.623 3.790 -999.990 -999.990 1.266 ..P WKT 2010 10 30 02 24 55 31.3200 -97.3300 251.000 122.0 126.361 4.410 -999.990 -999.990 1.264 ..P WKT 2010 10 30 02 29 55 31.3200 -97.3300 251.000 457.0 132.087 3.450 -999.990 -999.990 1.321 ..P WKT 2010 10 30 02 39 55 31.3200 -97.3300 251.000 30.0 121.648 3.710 -999.990 -999.990 1.216 ..P WKT 2010 10 30 02 44 55 31.3200 -97.3300 251.000 122.0 126.441 3.260 -999.990 -999.990 1.264 ..P WKT 2010 10 30 02 49 55 31.3200 -97.3300 251.000 457.0 133.817 3.980 -999.990 -999.990 1.338 ..P WKT 2010 10 30 02 54 55 31.3200 -97.3300 251.000 30.0 128.132 4.650 -999.990 -999.990 1.281 ..P WKT 2010 10 30 02 59 55 31.3200 -97.3300 251.000 122.0 128.570 3.600 -999.990 -999.990 1.286 ..P WKT 2010 10 30 03 04 55 31.3200 -97.3300 251.000 457.0 131.727 3.350 -999.990 -999.990 1.317 ..P WKT 2010 10 30 03 14 55 31.3200 -97.3300 251.000 30.0 128.056 3.170 -999.990 -999.990 1.281 ..P WKT 2010 10 30 03 19 55 31.3200 -97.3300 251.000 122.0 117.419 4.350 -999.990 -999.990 1.174 ..P WKT 2010 10 30 03 24 55 31.3200 -97.3300 251.000 457.0 133.030 4.250 -999.990 -999.990 1.330 ..P WKT 2010 10 30 03 29 55 31.3200 -97.3300 251.000 30.0 121.851 4.340 -999.990 -999.990 1.219 ..P WKT 2010 10 30 03 34 55 31.3200 -97.3300 251.000 122.0 115.704 4.180 -999.990 -999.990 1.157 ..P WKT 2010 10 30 03 39 55 31.3200 -97.3300 251.000 457.0 132.263 3.360 -999.990 -999.990 1.323 ..P WKT 2010 10 30 03 49 55 31.3200 -97.3300 251.000 30.0 126.612 4.060 -999.990 -999.990 1.266 ..P WKT 2010 10 30 03 54 55 31.3200 -97.3300 251.000 122.0 115.145 4.860 -999.990 -999.990 1.151 ..P WKT 2010 10 30 03 59 55 31.3200 -97.3300 251.000 457.0 121.215 5.160 -999.990 -999.990 1.212 ..P WKT 2010 10 30 04 04 55 31.3200 -97.3300 251.000 30.0 116.953 5.140 -999.990 -999.990 1.170 ..P WKT 2010 10 30 04 09 55 31.3200 -97.3300 251.000 122.0 116.770 5.630 -999.990 -999.990 1.168 ..P WKT 2010 10 30 04 14 55 31.3200 -97.3300 251.000 457.0 127.459 5.520 -999.990 -999.990 1.275 ..P WKT 2010 10 30 04 24 55 31.3200 -97.3300 251.000 30.0 119.034 5.890 -999.990 -999.990 1.190 ..P WKT 2010 10 30 04 29 55 31.3200 -97.3300 251.000 122.0 121.666 4.810 -999.990 -999.990 1.217 ..P WKT 2010 10 30 04 34 55 31.3200 -97.3300 251.000 457.0 122.666 4.320 -999.990 -999.990 1.227 ..P WKT 2010 10 30 04 39 55 31.3200 -97.3300 251.000 30.0 115.514 4.340 -999.990 -999.990 1.155 ..P WKT 2010 10 30 04 44 55 31.3200 -97.3300 251.000 122.0 118.689 5.020 -999.990 -999.990 1.187 ..P WKT 2010 10 30 04 49 55 31.3200 -97.3300 251.000 457.0 122.949 3.970 -999.990 -999.990 1.229 ..P WKT 2010 10 30 05 04 55 31.3200 -97.3300 251.000 30.0 108.856 2.890 -999.990 -999.990 1.089 ..P WKT 2010 10 30 05 09 55 31.3200 -97.3300 251.000 122.0 113.669 5.070 -999.990 -999.990 1.137 ..P WKT 2010 10 30 05 14 55 31.3200 -97.3300 251.000 457.0 121.197 2.680 -999.990 -999.990 1.212 ..P WKT 2010 10 30 05 19 55 31.3200 -97.3300 251.000 30.0 112.158 2.710 -999.990 -999.990 1.122 ..P WKT 2010 10 30 05 24 55 31.3200 -97.3300 251.000 122.0 119.957 3.310 -999.990 -999.990 1.200 ..P WKT 2010 10 30 05 29 55 31.3200 -97.3300 251.000 457.0 128.299 2.970 -999.990 -999.990 1.283 ..P WKT 2010 10 30 05 39 55 31.3200 -97.3300 251.000 30.0 120.144 3.470 -999.990 -999.990 1.201 ..P WKT 2010 10 30 05 44 55 31.3200 -97.3300 251.000 122.0 137.317 4.240 -999.990 -999.990 1.373 ..P WKT 2010 10 30 05 49 55 31.3200 -97.3300 251.000 457.0 147.158 3.360 -999.990 -999.990 1.472 ..P WKT 2010 10 30 05 54 55 31.3200 -97.3300 251.000 30.0 121.979 2.890 -999.990 -999.990 1.220 ..P WKT 2010 10 30 05 59 55 31.3200 -97.3300 251.000 122.0 152.449 3.020 -999.990 -999.990 1.524 ..P WKT 2010 10 30 06 04 55 31.3200 -97.3300 251.000 457.0 140.302 2.960 -999.990 -999.990 1.403 ..P WKT 2010 10 30 06 14 55 31.3200 -97.3300 251.000 30.0 113.684 3.360 -999.990 -999.990 1.137 ..P WKT 2010 10 30 06 19 55 31.3200 -97.3300 251.000 122.0 112.784 2.990 -999.990 -999.990 1.128 ..P WKT 2010 10 30 06 24 55 31.3200 -97.3300 251.000 457.0 136.171 3.320 -999.990 -999.990 1.362 ..P WKT 2010 10 30 06 29 55 31.3200 -97.3300 251.000 30.0 107.186 3.960 -999.990 -999.990 1.072 ..P WKT 2010 10 30 06 34 55 31.3200 -97.3300 251.000 122.0 116.054 3.700 -999.990 -999.990 1.161 ..P WKT 2010 10 30 06 39 55 31.3200 -97.3300 251.000 457.0 109.864 4.860 -999.990 -999.990 1.099 ..P WKT 2010 10 30 06 49 55 31.3200 -97.3300 251.000 30.0 111.397 3.510 -999.990 -999.990 1.114 ..P WKT 2010 10 30 06 54 55 31.3200 -97.3300 251.000 122.0 114.373 4.120 -999.990 -999.990 1.144 ..P WKT 2010 10 30 06 59 55 31.3200 -97.3300 251.000 457.0 114.364 3.300 -999.990 -999.990 1.144 ..P WKT 2010 10 30 07 04 55 31.3200 -97.3300 251.000 30.0 114.084 4.780 -999.990 -999.990 1.141 ..P WKT 2010 10 30 07 09 55 31.3200 -97.3300 251.000 122.0 116.517 3.170 -999.990 -999.990 1.165 ..P WKT 2010 10 30 07 14 55 31.3200 -97.3300 251.000 457.0 118.272 3.590 -999.990 -999.990 1.183 ..P WKT 2010 10 30 07 24 55 31.3200 -97.3300 251.000 30.0 116.027 3.130 -999.990 -999.990 1.160 ..P WKT 2010 10 30 07 29 55 31.3200 -97.3300 251.000 122.0 114.198 3.370 -999.990 -999.990 1.142 ..P WKT 2010 10 30 07 34 55 31.3200 -97.3300 251.000 457.0 120.502 4.070 -999.990 -999.990 1.205 ..P WKT 2010 10 30 07 39 55 31.3200 -97.3300 251.000 30.0 114.471 3.640 -999.990 -999.990 1.145 ..P WKT 2010 10 30 07 44 55 31.3200 -97.3300 251.000 122.0 119.013 3.170 -999.990 -999.990 1.190 ..P WKT 2010 10 30 07 49 55 31.3200 -97.3300 251.000 457.0 118.811 4.230 -999.990 -999.990 1.188 ..P WKT 2010 10 30 07 59 55 31.3200 -97.3300 251.000 30.0 112.308 2.640 -999.990 -999.990 1.123 ..P WKT 2010 10 30 08 04 55 31.3200 -97.3300 251.000 122.0 122.540 3.250 -999.990 -999.990 1.225 ..P WKT 2010 10 30 08 09 55 31.3200 -97.3300 251.000 457.0 119.763 3.240 -999.990 -999.990 1.198 ..P WKT 2010 10 30 08 14 55 31.3200 -97.3300 251.000 30.0 111.296 3.360 -999.990 -999.990 1.113 ..P WKT 2010 10 30 08 19 55 31.3200 -97.3300 251.000 122.0 120.171 3.950 -999.990 -999.990 1.202 ..P WKT 2010 10 30 08 24 55 31.3200 -97.3300 251.000 457.0 110.621 3.060 -999.990 -999.990 1.106 ..P WKT 2010 10 30 08 34 55 31.3200 -97.3300 251.000 30.0 107.722 3.770 -999.990 -999.990 1.077 ..P WKT 2010 10 30 08 39 55 31.3200 -97.3300 251.000 122.0 116.537 3.210 -999.990 -999.990 1.165 ..P WKT 2010 10 30 08 44 55 31.3200 -97.3300 251.000 457.0 111.537 3.850 -999.990 -999.990 1.115 ..P WKT 2010 10 30 08 49 55 31.3200 -97.3300 251.000 30.0 113.850 3.290 -999.990 -999.990 1.139 ..P WKT 2010 10 30 08 54 55 31.3200 -97.3300 251.000 122.0 116.434 3.070 -999.990 -999.990 1.164 ..P WKT 2010 10 30 08 59 55 31.3200 -97.3300 251.000 457.0 115.226 3.380 -999.990 -999.990 1.152 ..P WKT 2010 10 30 09 09 55 31.3200 -97.3300 251.000 30.0 118.459 2.810 -999.990 -999.990 1.185 ..P WKT 2010 10 30 09 14 55 31.3200 -97.3300 251.000 122.0 118.295 3.240 -999.990 -999.990 1.183 ..P WKT 2010 10 30 09 19 55 31.3200 -97.3300 251.000 457.0 125.442 3.550 -999.990 -999.990 1.254 ..P WKT 2010 10 30 09 24 55 31.3200 -97.3300 251.000 30.0 119.593 2.990 -999.990 -999.990 1.196 ..P WKT 2010 10 30 09 29 55 31.3200 -97.3300 251.000 122.0 111.307 3.570 -999.990 -999.990 1.113 ..P WKT 2010 10 30 09 34 55 31.3200 -97.3300 251.000 457.0 122.514 3.070 -999.990 -999.990 1.225 ..P WKT 2010 10 30 09 44 55 31.3200 -97.3300 251.000 30.0 130.365 4.210 -999.990 -999.990 1.304 ..P WKT 2010 10 30 09 49 55 31.3200 -97.3300 251.000 122.0 123.222 3.140 -999.990 -999.990 1.232 ..P WKT 2010 10 30 09 54 55 31.3200 -97.3300 251.000 457.0 125.552 3.770 -999.990 -999.990 1.256 ..P WKT 2010 10 30 09 59 55 31.3200 -97.3300 251.000 30.0 126.123 3.310 -999.990 -999.990 1.261 ..P WKT 2010 10 30 10 04 55 31.3200 -97.3300 251.000 122.0 109.510 4.490 -999.990 -999.990 1.095 ..P WKT 2010 10 30 10 09 55 31.3200 -97.3300 251.000 457.0 122.663 2.730 -999.990 -999.990 1.227 ..P WKT 2010 10 30 10 19 55 31.3200 -97.3300 251.000 30.0 125.661 2.790 -999.990 -999.990 1.257 ..P WKT 2010 10 30 10 24 55 31.3200 -97.3300 251.000 122.0 119.158 3.010 -999.990 -999.990 1.192 ..P WKT 2010 10 30 10 29 55 31.3200 -97.3300 251.000 457.0 124.560 2.740 -999.990 -999.990 1.246 ..P WKT 2010 10 30 10 34 55 31.3200 -97.3300 251.000 30.0 123.333 3.610 -999.990 -999.990 1.233 ..P WKT 2010 10 30 10 39 55 31.3200 -97.3300 251.000 122.0 120.214 3.290 -999.990 -999.990 1.202 ..P WKT 2010 10 30 10 44 55 31.3200 -97.3300 251.000 457.0 125.073 3.770 -999.990 -999.990 1.251 ..P WKT 2010 10 30 10 54 55 31.3200 -97.3300 251.000 30.0 129.942 3.330 -999.990 -999.990 1.299 ..P WKT 2010 10 30 10 59 55 31.3200 -97.3300 251.000 122.0 121.435 3.080 -999.990 -999.990 1.214 ..P WKT 2010 10 30 11 04 55 31.3200 -97.3300 251.000 457.0 127.393 3.590 -999.990 -999.990 1.274 ..P WKT 2010 10 30 11 09 55 31.3200 -97.3300 251.000 30.0 123.888 3.570 -999.990 -999.990 1.239 ..P WKT 2010 10 30 11 14 55 31.3200 -97.3300 251.000 122.0 113.355 3.690 -999.990 -999.990 1.134 ..P WKT 2010 10 30 11 19 55 31.3200 -97.3300 251.000 457.0 126.343 3.760 -999.990 -999.990 1.263 ..P WKT 2010 10 30 11 29 55 31.3200 -97.3300 251.000 30.0 132.763 4.200 -999.990 -999.990 1.328 ..P WKT 2010 10 30 11 34 55 31.3200 -97.3300 251.000 122.0 119.847 3.770 -999.990 -999.990 1.198 ..P WKT 2010 10 30 11 39 55 31.3200 -97.3300 251.000 457.0 124.501 3.540 -999.990 -999.990 1.245 ..P WKT 2010 10 30 11 44 55 31.3200 -97.3300 251.000 30.0 140.099 3.490 -999.990 -999.990 1.401 ..P WKT 2010 10 30 11 49 55 31.3200 -97.3300 251.000 122.0 123.537 3.270 -999.990 -999.990 1.235 ..P WKT 2010 10 30 12 09 55 31.3200 -97.3300 251.000 457.0 140.364 3.080 -999.990 -999.990 1.404 ..P WKT 2010 10 30 12 10 25 31.3200 -97.3300 251.000 457.0 138.978 3.110 -999.990 -999.990 1.390 ..P WKT 2010 10 30 12 10 55 31.3200 -97.3300 251.000 457.0 138.673 3.460 -999.990 -999.990 1.387 ..P WKT 2010 10 30 12 11 25 31.3200 -97.3300 251.000 457.0 137.828 4.740 -999.990 -999.990 1.378 ..P WKT 2010 10 30 12 11 55 31.3200 -97.3300 251.000 457.0 139.144 5.010 -999.990 -999.990 1.391 ..P WKT 2010 10 30 12 12 25 31.3200 -97.3300 251.000 457.0 141.813 3.060 -999.990 -999.990 1.418 ..P WKT 2010 10 30 12 12 55 31.3200 -97.3300 251.000 457.0 139.075 4.500 -999.990 -999.990 1.391 ..P WKT 2010 10 30 12 13 25 31.3200 -97.3300 251.000 457.0 140.662 4.040 -999.990 -999.990 1.407 ..P WKT 2010 10 30 12 13 55 31.3200 -97.3300 251.000 457.0 139.546 3.300 -999.990 -999.990 1.395 ..P WKT 2010 10 30 12 14 25 31.3200 -97.3300 251.000 457.0 140.593 3.180 -999.990 -999.990 1.406 ..P WKT 2010 10 30 12 14 55 31.3200 -97.3300 251.000 457.0 141.910 3.300 -999.990 -999.990 1.419 ..P WKT 2010 10 30 12 19 55 31.3200 -97.3300 251.000 30.0 158.325 3.870 -999.990 -999.990 1.583 ..P WKT 2010 10 30 12 24 55 31.3200 -97.3300 251.000 122.0 120.400 4.720 -999.990 -999.990 1.204 ..P WKT 2010 10 30 12 29 55 31.3200 -97.3300 251.000 457.0 130.867 4.520 -999.990 -999.990 1.309 ..P WKT 2010 10 30 12 34 55 31.3200 -97.3300 251.000 30.0 167.566 3.490 -999.990 -999.990 1.676 ..P WKT 2010 10 30 12 39 55 31.3200 -97.3300 251.000 122.0 122.600 3.350 -999.990 -999.990 1.226 ..P WKT 2010 10 30 12 44 55 31.3200 -97.3300 251.000 457.0 136.045 3.570 -999.990 -999.990 1.360 ..P WKT 2010 10 30 12 54 55 31.3200 -97.3300 251.000 30.0 154.967 4.110 -999.990 -999.990 1.550 ..P WKT 2010 10 30 12 59 55 31.3200 -97.3300 251.000 122.0 123.646 3.640 -999.990 -999.990 1.236 ..P WKT 2010 10 30 13 04 55 31.3200 -97.3300 251.000 457.0 144.540 3.700 -999.990 -999.990 1.445 ..P WKT 2010 10 30 13 09 55 31.3200 -97.3300 251.000 30.0 156.238 3.930 -999.990 -999.990 1.562 ..P WKT 2010 10 30 13 14 55 31.3200 -97.3300 251.000 122.0 120.036 4.660 -999.990 -999.990 1.200 ..P WKT 2010 10 30 13 19 55 31.3200 -97.3300 251.000 457.0 145.538 4.220 -999.990 -999.990 1.455 ..P WKT 2010 10 30 13 29 55 31.3200 -97.3300 251.000 30.0 163.104 4.520 -999.990 -999.990 1.631 ..P WKT 2010 10 30 13 34 55 31.3200 -97.3300 251.000 122.0 125.380 5.780 -999.990 -999.990 1.254 ..P WKT 2010 10 30 13 39 55 31.3200 -97.3300 251.000 457.0 152.362 3.760 -999.990 -999.990 1.524 ..P WKT 2010 10 30 13 44 55 31.3200 -97.3300 251.000 30.0 173.121 4.300 -999.990 -999.990 1.731 ..P WKT 2010 10 30 13 49 55 31.3200 -97.3300 251.000 122.0 132.408 3.720 -999.990 -999.990 1.324 ..P WKT 2010 10 30 13 54 55 31.3200 -97.3300 251.000 457.0 148.700 4.220 -999.990 -999.990 1.487 ..P WKT 2010 10 30 14 04 55 31.3200 -97.3300 251.000 30.0 165.021 3.990 -999.990 -999.990 1.650 ..P WKT 2010 10 30 14 09 55 31.3200 -97.3300 251.000 122.0 115.737 5.900 -999.990 -999.990 1.157 ..P WKT 2010 10 30 14 14 55 31.3200 -97.3300 251.000 457.0 140.008 3.980 -999.990 -999.990 1.400 ..P WKT 2010 10 30 14 19 55 31.3200 -97.3300 251.000 30.0 172.144 4.120 -999.990 -999.990 1.721 ..P WKT 2010 10 30 14 24 55 31.3200 -97.3300 251.000 122.0 122.845 3.950 -999.990 -999.990 1.228 ..P WKT 2010 10 30 14 29 55 31.3200 -97.3300 251.000 457.0 128.829 4.000 -999.990 -999.990 1.288 ..P WKT 2010 10 30 14 39 55 31.3200 -97.3300 251.000 30.0 162.314 4.680 -999.990 -999.990 1.623 ..P WKT 2010 10 30 14 44 55 31.3200 -97.3300 251.000 122.0 134.103 4.630 -999.990 -999.990 1.341 ..P WKT 2010 10 30 14 49 55 31.3200 -97.3300 251.000 457.0 125.410 4.690 -999.990 -999.990 1.254 ..P WKT 2010 10 30 14 54 55 31.3200 -97.3300 251.000 30.0 157.799 4.770 -999.990 -999.990 1.578 ..P WKT 2010 10 30 14 59 55 31.3200 -97.3300 251.000 122.0 136.766 4.470 -999.990 -999.990 1.368 ..P WKT 2010 10 30 15 04 55 31.3200 -97.3300 251.000 457.0 110.711 4.650 -999.990 -999.990 1.107 ..P WKT 2010 10 30 15 14 55 31.3200 -97.3300 251.000 30.0 145.883 5.240 -999.990 -999.990 1.459 ..P WKT 2010 10 30 15 19 55 31.3200 -97.3300 251.000 122.0 138.348 5.480 -999.990 -999.990 1.383 ..P WKT 2010 10 30 15 24 55 31.3200 -97.3300 251.000 457.0 113.176 5.080 -999.990 -999.990 1.132 ..P WKT 2010 10 30 15 29 55 31.3200 -97.3300 251.000 30.0 136.165 4.560 -999.990 -999.990 1.362 ..P WKT 2010 10 30 15 34 55 31.3200 -97.3300 251.000 122.0 131.612 4.770 -999.990 -999.990 1.316 ..P WKT 2010 10 30 15 39 55 31.3200 -97.3300 251.000 457.0 117.831 4.450 -999.990 -999.990 1.178 ..P WKT 2010 10 30 15 49 55 31.3200 -97.3300 251.000 30.0 136.895 4.420 -999.990 -999.990 1.369 ..P WKT 2010 10 30 15 54 55 31.3200 -97.3300 251.000 122.0 133.505 4.570 -999.990 -999.990 1.335 ..P WKT 2010 10 30 15 59 55 31.3200 -97.3300 251.000 457.0 117.080 5.040 -999.990 -999.990 1.171 ..P WKT 2010 10 30 16 04 55 31.3200 -97.3300 251.000 30.0 136.497 5.100 -999.990 -999.990 1.365 ..P WKT 2010 10 30 16 09 55 31.3200 -97.3300 251.000 122.0 139.080 4.700 -999.990 -999.990 1.391 ..P WKT 2010 10 30 16 14 55 31.3200 -97.3300 251.000 457.0 116.133 4.620 -999.990 -999.990 1.161 ..P WKT 2010 10 30 16 24 55 31.3200 -97.3300 251.000 30.0 146.950 4.870 -999.990 -999.990 1.469 ..P WKT 2010 10 30 16 29 55 31.3200 -97.3300 251.000 122.0 141.500 5.200 -999.990 -999.990 1.415 ..P WKT 2010 10 30 16 34 55 31.3200 -97.3300 251.000 457.0 106.705 5.070 -999.990 -999.990 1.067 ..P WKT 2010 10 30 16 39 55 31.3200 -97.3300 251.000 30.0 146.360 7.200 -999.990 -999.990 1.464 ..P WKT 2010 10 30 16 44 55 31.3200 -97.3300 251.000 122.0 152.867 7.170 -999.990 -999.990 1.529 ..P WKT 2010 10 30 16 49 55 31.3200 -97.3300 251.000 457.0 110.181 5.220 -999.990 -999.990 1.102 ..P WKT 2010 10 30 17 04 55 31.3200 -97.3300 251.000 30.0 148.663 5.490 -999.990 -999.990 1.487 ..P WKT 2010 10 30 17 09 55 31.3200 -97.3300 251.000 122.0 146.438 5.820 -999.990 -999.990 1.464 ..P WKT 2010 10 30 17 14 55 31.3200 -97.3300 251.000 457.0 114.846 5.950 -999.990 -999.990 1.148 ..P WKT 2010 10 30 17 19 55 31.3200 -97.3300 251.000 30.0 140.085 5.040 -999.990 -999.990 1.401 ..P WKT 2010 10 30 17 24 55 31.3200 -97.3300 251.000 122.0 148.195 4.810 -999.990 -999.990 1.482 ..P WKT 2010 10 30 17 29 55 31.3200 -97.3300 251.000 457.0 111.969 5.000 -999.990 -999.990 1.120 ..P WKT 2010 10 30 17 39 55 31.3200 -97.3300 251.000 30.0 139.162 4.660 -999.990 -999.990 1.392 ..P WKT 2010 10 30 17 44 55 31.3200 -97.3300 251.000 122.0 155.802 5.070 -999.990 -999.990 1.558 ..P WKT 2010 10 30 17 49 55 31.3200 -97.3300 251.000 457.0 133.396 5.480 -999.990 -999.990 1.334 ..P WKT 2010 10 30 17 54 55 31.3200 -97.3300 251.000 30.0 145.548 5.340 -999.990 -999.990 1.455 ..P WKT 2010 10 30 17 59 55 31.3200 -97.3300 251.000 122.0 132.255 4.730 -999.990 -999.990 1.323 ..P WKT 2010 10 30 18 04 55 31.3200 -97.3300 251.000 457.0 141.687 4.760 -999.990 -999.990 1.417 ..P WKT 2010 10 30 18 14 55 31.3200 -97.3300 251.000 30.0 141.072 5.300 -999.990 -999.990 1.411 ..P WKT 2010 10 30 18 19 55 31.3200 -97.3300 251.000 122.0 139.870 4.870 -999.990 -999.990 1.399 ..P WKT 2010 10 30 18 24 55 31.3200 -97.3300 251.000 457.0 140.438 7.490 -999.990 -999.990 1.404 ..P WKT 2010 10 30 18 29 55 31.3200 -97.3300 251.000 30.0 134.197 5.060 -999.990 -999.990 1.342 ..P WKT 2010 10 30 18 34 55 31.3200 -97.3300 251.000 122.0 139.940 4.890 -999.990 -999.990 1.399 ..P WKT 2010 10 30 18 39 55 31.3200 -97.3300 251.000 457.0 134.651 5.010 -999.990 -999.990 1.347 ..P WKT 2010 10 30 18 49 55 31.3200 -97.3300 251.000 30.0 141.818 5.020 -999.990 -999.990 1.418 ..P WKT 2010 10 30 18 54 55 31.3200 -97.3300 251.000 122.0 140.927 6.160 -999.990 -999.990 1.409 ..P WKT 2010 10 30 18 59 55 31.3200 -97.3300 251.000 457.0 140.716 5.180 -999.990 -999.990 1.407 ..P WKT 2010 10 30 19 04 55 31.3200 -97.3300 251.000 30.0 133.966 5.600 -999.990 -999.990 1.340 ..P WKT 2010 10 30 19 09 55 31.3200 -97.3300 251.000 122.0 134.572 5.620 -999.990 -999.990 1.346 ..P WKT 2010 10 30 19 14 55 31.3200 -97.3300 251.000 457.0 138.176 5.180 -999.990 -999.990 1.382 ..P WKT 2010 10 30 19 24 55 31.3200 -97.3300 251.000 30.0 141.903 5.340 -999.990 -999.990 1.419 ..P WKT 2010 10 30 19 29 55 31.3200 -97.3300 251.000 122.0 142.977 5.630 -999.990 -999.990 1.430 ..P WKT 2010 10 30 19 34 55 31.3200 -97.3300 251.000 457.0 130.828 5.830 -999.990 -999.990 1.308 ..P WKT 2010 10 30 19 39 55 31.3200 -97.3300 251.000 30.0 143.083 5.580 -999.990 -999.990 1.431 ..P WKT 2010 10 30 19 44 55 31.3200 -97.3300 251.000 122.0 136.249 5.540 -999.990 -999.990 1.362 ..P WKT 2010 10 30 19 49 55 31.3200 -97.3300 251.000 457.0 138.824 5.560 -999.990 -999.990 1.388 ..P WKT 2010 10 30 19 59 55 31.3200 -97.3300 251.000 30.0 136.473 5.730 -999.990 -999.990 1.365 ..P WKT 2010 10 30 20 04 55 31.3200 -97.3300 251.000 122.0 135.366 5.480 -999.990 -999.990 1.354 ..P WKT 2010 10 30 20 09 55 31.3200 -97.3300 251.000 457.0 142.989 5.500 -999.990 -999.990 1.430 ..P WKT 2010 10 30 20 14 55 31.3200 -97.3300 251.000 30.0 146.248 5.600 -999.990 -999.990 1.462 ..P WKT 2010 10 30 20 19 55 31.3200 -97.3300 251.000 122.0 146.233 5.580 -999.990 -999.990 1.462 ..P WKT 2010 10 30 20 24 55 31.3200 -97.3300 251.000 457.0 149.493 5.510 -999.990 -999.990 1.495 ..P WKT 2010 10 30 20 34 55 31.3200 -97.3300 251.000 30.0 156.677 5.540 -999.990 -999.990 1.567 ..P WKT 2010 10 30 20 39 55 31.3200 -97.3300 251.000 122.0 159.510 5.620 -999.990 -999.990 1.595 ..P WKT 2010 10 30 20 44 55 31.3200 -97.3300 251.000 457.0 154.425 5.850 -999.990 -999.990 1.544 ..P WKT 2010 10 30 20 49 55 31.3200 -97.3300 251.000 30.0 153.708 5.710 -999.990 -999.990 1.537 ..P WKT 2010 10 30 20 54 55 31.3200 -97.3300 251.000 122.0 156.814 6.120 -999.990 -999.990 1.568 ..P WKT 2010 10 30 20 59 55 31.3200 -97.3300 251.000 457.0 151.182 6.880 -999.990 -999.990 1.512 ..P WKT 2010 10 30 21 09 55 31.3200 -97.3300 251.000 30.0 148.537 5.910 -999.990 -999.990 1.485 ..P WKT 2010 10 30 21 14 55 31.3200 -97.3300 251.000 122.0 146.064 6.060 -999.990 -999.990 1.461 ..P WKT 2010 10 30 21 19 55 31.3200 -97.3300 251.000 457.0 137.033 6.230 -999.990 -999.990 1.370 ..P WKT 2010 10 30 21 24 55 31.3200 -97.3300 251.000 30.0 135.924 6.180 -999.990 -999.990 1.359 ..P WKT 2010 10 30 21 29 55 31.3200 -97.3300 251.000 122.0 141.920 6.520 -999.990 -999.990 1.419 ..P WKT 2010 10 30 21 34 55 31.3200 -97.3300 251.000 457.0 133.978 6.440 -999.990 -999.990 1.340 ..P WKT 2010 10 30 21 44 55 31.3200 -97.3300 251.000 30.0 133.731 6.530 -999.990 -999.990 1.337 ..P WKT 2010 10 30 21 49 55 31.3200 -97.3300 251.000 122.0 135.960 6.670 -999.990 -999.990 1.360 ..P WKT 2010 10 30 21 54 55 31.3200 -97.3300 251.000 457.0 125.203 7.130 -999.990 -999.990 1.252 ..P WKT 2010 10 30 21 59 55 31.3200 -97.3300 251.000 30.0 123.194 6.470 -999.990 -999.990 1.232 ..P WKT 2010 10 30 22 04 55 31.3200 -97.3300 251.000 122.0 126.517 7.000 -999.990 -999.990 1.265 ..P WKT 2010 10 30 22 09 55 31.3200 -97.3300 251.000 457.0 121.636 6.740 -999.990 -999.990 1.216 ..P WKT 2010 10 30 22 19 55 31.3200 -97.3300 251.000 30.0 130.998 6.360 -999.990 -999.990 1.310 ..P WKT 2010 10 30 22 24 55 31.3200 -97.3300 251.000 122.0 130.472 6.520 -999.990 -999.990 1.305 ..P WKT 2010 10 30 22 29 55 31.3200 -97.3300 251.000 457.0 131.589 6.830 -999.990 -999.990 1.316 ..P WKT 2010 10 30 22 34 55 31.3200 -97.3300 251.000 30.0 130.107 6.600 -999.990 -999.990 1.301 ..P WKT 2010 10 30 22 39 55 31.3200 -97.3300 251.000 122.0 138.747 6.860 -999.990 -999.990 1.387 ..P WKT 2010 10 30 22 44 55 31.3200 -97.3300 251.000 457.0 136.992 7.160 -999.990 -999.990 1.370 ..P WKT 2010 10 30 22 54 55 31.3200 -97.3300 251.000 30.0 134.751 6.970 -999.990 -999.990 1.348 ..P WKT 2010 10 30 22 59 55 31.3200 -97.3300 251.000 122.0 138.644 8.120 -999.990 -999.990 1.386 ..P WKT 2010 10 30 23 04 55 31.3200 -97.3300 251.000 457.0 131.452 6.640 -999.990 -999.990 1.315 ..P WKT 2010 10 30 23 09 55 31.3200 -97.3300 251.000 30.0 138.221 6.780 -999.990 -999.990 1.382 ..P WKT 2010 10 30 23 14 55 31.3200 -97.3300 251.000 122.0 133.629 7.110 -999.990 -999.990 1.336 ..P WKT 2010 10 30 23 19 55 31.3200 -97.3300 251.000 457.0 136.703 7.200 -999.990 -999.990 1.367 ..P WKT 2010 10 30 23 29 55 31.3200 -97.3300 251.000 30.0 137.826 6.810 -999.990 -999.990 1.378 ..P WKT 2010 10 30 23 34 55 31.3200 -97.3300 251.000 122.0 134.096 7.020 -999.990 -999.990 1.341 ..P WKT 2010 10 30 23 39 55 31.3200 -97.3300 251.000 457.0 131.734 6.890 -999.990 -999.990 1.317 ..P WKT 2010 10 30 23 44 55 31.3200 -97.3300 251.000 30.0 141.562 6.760 -999.990 -999.990 1.416 ..P WKT 2010 10 30 23 49 55 31.3200 -97.3300 251.000 122.0 145.090 7.160 -999.990 -999.990 1.451 ..P WKT 2010 10 31 00 09 55 31.3200 -97.3300 251.000 457.0 136.706 6.650 -999.990 -999.990 1.367 ..P WKT 2010 10 31 00 10 25 31.3200 -97.3300 251.000 457.0 140.502 6.680 -999.990 -999.990 1.405 ..P WKT 2010 10 31 00 10 55 31.3200 -97.3300 251.000 457.0 139.367 6.720 -999.990 -999.990 1.394 ..P WKT 2010 10 31 00 11 25 31.3200 -97.3300 251.000 457.0 135.766 7.350 -999.990 -999.990 1.358 ..P WKT 2010 10 31 00 11 55 31.3200 -97.3300 251.000 457.0 133.536 7.280 -999.990 -999.990 1.335 ..P WKT 2010 10 31 00 12 25 31.3200 -97.3300 251.000 457.0 135.688 6.840 -999.990 -999.990 1.357 ..P WKT 2010 10 31 00 12 55 31.3200 -97.3300 251.000 457.0 136.470 6.840 -999.990 -999.990 1.365 ..P WKT 2010 10 31 00 13 25 31.3200 -97.3300 251.000 457.0 135.883 6.830 -999.990 -999.990 1.359 ..P WKT 2010 10 31 00 13 55 31.3200 -97.3300 251.000 457.0 134.474 6.650 -999.990 -999.990 1.345 ..P WKT 2010 10 31 00 14 25 31.3200 -97.3300 251.000 457.0 138.817 7.440 -999.990 -999.990 1.388 ..P WKT 2010 10 31 00 14 55 31.3200 -97.3300 251.000 457.0 136.039 7.240 -999.990 -999.990 1.360 ..P WKT 2010 10 31 00 19 55 31.3200 -97.3300 251.000 30.0 132.633 7.150 -999.990 -999.990 1.326 ..P WKT 2010 10 31 00 24 55 31.3200 -97.3300 251.000 122.0 130.324 7.010 -999.990 -999.990 1.303 ..P WKT 2010 10 31 00 29 55 31.3200 -97.3300 251.000 457.0 128.837 7.100 -999.990 -999.990 1.288 ..P WKT 2010 10 31 00 34 55 31.3200 -97.3300 251.000 30.0 142.953 6.590 -999.990 -999.990 1.430 ..P WKT 2010 10 31 00 39 55 31.3200 -97.3300 251.000 122.0 126.684 6.560 -999.990 -999.990 1.267 ..P WKT 2010 10 31 00 44 55 31.3200 -97.3300 251.000 457.0 132.861 6.760 -999.990 -999.990 1.329 ..P WKT 2010 10 31 00 54 55 31.3200 -97.3300 251.000 30.0 156.158 6.760 -999.990 -999.990 1.562 ..P WKT 2010 10 31 00 59 55 31.3200 -97.3300 251.000 122.0 135.796 7.780 -999.990 -999.990 1.358 ..P WKT 2010 10 31 01 04 55 31.3200 -97.3300 251.000 457.0 138.690 6.550 -999.990 -999.990 1.387 ..P WKT 2010 10 31 01 09 55 31.3200 -97.3300 251.000 30.0 144.866 6.520 -999.990 -999.990 1.449 ..P WKT 2010 10 31 01 14 55 31.3200 -97.3300 251.000 122.0 129.709 6.900 -999.990 -999.990 1.297 ..P WKT 2010 10 31 01 19 55 31.3200 -97.3300 251.000 457.0 136.431 6.850 -999.990 -999.990 1.364 ..P WKT 2010 10 31 01 29 55 31.3200 -97.3300 251.000 30.0 158.988 6.530 -999.990 -999.990 1.590 ..P WKT 2010 10 31 01 34 55 31.3200 -97.3300 251.000 122.0 132.455 6.530 -999.990 -999.990 1.325 ..P WKT 2010 10 31 01 39 55 31.3200 -97.3300 251.000 457.0 148.426 6.990 -999.990 -999.990 1.484 ..P WKT 2010 10 31 01 44 55 31.3200 -97.3300 251.000 30.0 153.326 7.180 -999.990 -999.990 1.533 ..P WKT 2010 10 31 01 49 55 31.3200 -97.3300 251.000 122.0 137.323 7.330 -999.990 -999.990 1.373 ..P WKT 2010 10 31 01 54 55 31.3200 -97.3300 251.000 457.0 141.267 7.000 -999.990 -999.990 1.413 ..P WKT 2010 10 31 02 04 55 31.3200 -97.3300 251.000 30.0 143.085 6.940 -999.990 -999.990 1.431 ..P WKT 2010 10 31 02 09 55 31.3200 -97.3300 251.000 122.0 136.181 7.460 -999.990 -999.990 1.362 ..P WKT 2010 10 31 02 14 55 31.3200 -97.3300 251.000 457.0 141.157 7.160 -999.990 -999.990 1.412 ..P WKT 2010 10 31 02 19 55 31.3200 -97.3300 251.000 30.0 148.043 6.710 -999.990 -999.990 1.480 ..P WKT 2010 10 31 02 24 55 31.3200 -97.3300 251.000 122.0 135.000 7.280 -999.990 -999.990 1.350 ..P WKT 2010 10 31 02 29 55 31.3200 -97.3300 251.000 457.0 131.922 6.650 -999.990 -999.990 1.319 ..P WKT 2010 10 31 02 39 55 31.3200 -97.3300 251.000 30.0 143.934 6.500 -999.990 -999.990 1.439 ..P WKT 2010 10 31 02 44 55 31.3200 -97.3300 251.000 122.0 132.554 6.490 -999.990 -999.990 1.326 ..P WKT 2010 10 31 02 49 55 31.3200 -97.3300 251.000 457.0 121.996 7.570 -999.990 -999.990 1.220 ..P WKT 2010 10 31 02 54 55 31.3200 -97.3300 251.000 30.0 143.081 6.790 -999.990 -999.990 1.431 ..P WKT 2010 10 31 02 59 55 31.3200 -97.3300 251.000 122.0 138.933 6.020 -999.990 -999.990 1.389 ..P WKT 2010 10 31 03 04 55 31.3200 -97.3300 251.000 457.0 130.696 7.000 -999.990 -999.990 1.307 ..P WKT 2010 10 31 03 14 55 31.3200 -97.3300 251.000 30.0 127.197 6.320 -999.990 -999.990 1.272 ..P WKT 2010 10 31 03 19 55 31.3200 -97.3300 251.000 122.0 144.471 6.220 -999.990 -999.990 1.445 ..P WKT 2010 10 31 03 24 55 31.3200 -97.3300 251.000 457.0 132.578 6.330 -999.990 -999.990 1.326 ..P WKT 2010 10 31 03 29 55 31.3200 -97.3300 251.000 30.0 130.907 6.320 -999.990 -999.990 1.309 ..P WKT 2010 10 31 03 34 55 31.3200 -97.3300 251.000 122.0 128.827 6.090 -999.990 -999.990 1.288 ..P WKT 2010 10 31 03 39 55 31.3200 -97.3300 251.000 457.0 118.166 6.420 -999.990 -999.990 1.182 ..P WKT 2010 10 31 03 49 55 31.3200 -97.3300 251.000 30.0 131.249 5.900 -999.990 -999.990 1.312 ..P WKT 2010 10 31 03 54 55 31.3200 -97.3300 251.000 122.0 123.938 6.040 -999.990 -999.990 1.239 ..P WKT 2010 10 31 03 59 55 31.3200 -97.3300 251.000 457.0 128.338 6.350 -999.990 -999.990 1.283 ..P WKT 2010 10 31 04 04 55 31.3200 -97.3300 251.000 30.0 130.287 5.940 -999.990 -999.990 1.303 ..P WKT 2010 10 31 04 09 55 31.3200 -97.3300 251.000 122.0 114.266 6.380 -999.990 -999.990 1.143 ..P WKT 2010 10 31 04 14 55 31.3200 -97.3300 251.000 457.0 133.365 5.650 -999.990 -999.990 1.334 ..P WKT 2010 10 31 04 24 55 31.3200 -97.3300 251.000 30.0 137.686 6.250 -999.990 -999.990 1.377 ..P WKT 2010 10 31 04 29 55 31.3200 -97.3300 251.000 122.0 127.542 6.950 -999.990 -999.990 1.275 ..P WKT 2010 10 31 04 34 55 31.3200 -97.3300 251.000 457.0 140.800 5.870 -999.990 -999.990 1.408 ..P WKT 2010 10 31 04 39 55 31.3200 -97.3300 251.000 30.0 134.195 6.340 -999.990 -999.990 1.342 ..P WKT 2010 10 31 04 44 55 31.3200 -97.3300 251.000 122.0 131.400 6.080 -999.990 -999.990 1.314 ..P WKT 2010 10 31 04 49 55 31.3200 -97.3300 251.000 457.0 132.957 6.880 -999.990 -999.990 1.330 ..P WKT 2010 10 31 05 04 55 31.3200 -97.3300 251.000 30.0 134.382 6.220 -999.990 -999.990 1.344 ..P WKT 2010 10 31 05 09 55 31.3200 -97.3300 251.000 122.0 134.725 6.000 -999.990 -999.990 1.347 ..P WKT 2010 10 31 05 14 55 31.3200 -97.3300 251.000 457.0 112.509 6.250 -999.990 -999.990 1.125 ..P WKT 2010 10 31 05 19 55 31.3200 -97.3300 251.000 30.0 137.040 5.830 -999.990 -999.990 1.370 ..P WKT 2010 10 31 05 24 55 31.3200 -97.3300 251.000 122.0 132.219 5.640 -999.990 -999.990 1.322 ..P WKT 2010 10 31 05 29 55 31.3200 -97.3300 251.000 457.0 115.989 5.900 -999.990 -999.990 1.160 ..P WKT 2010 10 31 05 39 55 31.3200 -97.3300 251.000 30.0 138.223 6.220 -999.990 -999.990 1.382 ..P WKT 2010 10 31 05 44 55 31.3200 -97.3300 251.000 122.0 134.578 6.500 -999.990 -999.990 1.346 ..P WKT 2010 10 31 05 49 55 31.3200 -97.3300 251.000 457.0 109.483 5.700 -999.990 -999.990 1.095 ..P WKT 2010 10 31 05 54 55 31.3200 -97.3300 251.000 30.0 137.473 6.360 -999.990 -999.990 1.375 ..P WKT 2010 10 31 05 59 55 31.3200 -97.3300 251.000 122.0 141.566 5.310 -999.990 -999.990 1.416 ..P WKT 2010 10 31 06 04 55 31.3200 -97.3300 251.000 457.0 109.559 5.170 -999.990 -999.990 1.096 ..P WKT 2010 10 31 06 14 55 31.3200 -97.3300 251.000 30.0 143.530 5.300 -999.990 -999.990 1.435 ..P WKT 2010 10 31 06 19 55 31.3200 -97.3300 251.000 122.0 150.741 5.920 -999.990 -999.990 1.507 ..P WKT 2010 10 31 06 24 55 31.3200 -97.3300 251.000 457.0 106.133 5.280 -999.990 -999.990 1.061 ..P WKT 2010 10 31 06 29 55 31.3200 -97.3300 251.000 30.0 137.489 5.560 -999.990 -999.990 1.375 ..P WKT 2010 10 31 06 34 55 31.3200 -97.3300 251.000 122.0 147.953 6.140 -999.990 -999.990 1.480 ..P WKT 2010 10 31 06 39 55 31.3200 -97.3300 251.000 457.0 104.176 6.180 -999.990 -999.990 1.042 ..P WKT 2010 10 31 06 49 55 31.3200 -97.3300 251.000 30.0 153.610 6.020 -999.990 -999.990 1.536 ..P WKT 2010 10 31 06 54 55 31.3200 -97.3300 251.000 122.0 165.190 5.620 -999.990 -999.990 1.652 ..P WKT 2010 10 31 06 59 55 31.3200 -97.3300 251.000 457.0 114.018 5.640 -999.990 -999.990 1.140 ..P WKT 2010 10 31 07 04 55 31.3200 -97.3300 251.000 30.0 157.173 5.550 -999.990 -999.990 1.572 ..P WKT 2010 10 31 07 09 55 31.3200 -97.3300 251.000 122.0 161.430 5.430 -999.990 -999.990 1.614 ..P WKT 2010 10 31 07 14 55 31.3200 -97.3300 251.000 457.0 112.041 4.970 -999.990 -999.990 1.120 ..P WKT 2010 10 31 07 24 55 31.3200 -97.3300 251.000 30.0 151.328 5.320 -999.990 -999.990 1.513 ..P WKT 2010 10 31 07 29 55 31.3200 -97.3300 251.000 122.0 159.532 6.470 -999.990 -999.990 1.595 ..P WKT 2010 10 31 07 34 55 31.3200 -97.3300 251.000 457.0 108.833 5.550 -999.990 -999.990 1.088 ..P WKT 2010 10 31 07 39 55 31.3200 -97.3300 251.000 30.0 154.270 5.940 -999.990 -999.990 1.543 ..P WKT 2010 10 31 07 44 55 31.3200 -97.3300 251.000 122.0 154.753 5.010 -999.990 -999.990 1.548 ..P WKT 2010 10 31 07 49 55 31.3200 -97.3300 251.000 457.0 106.241 4.810 -999.990 -999.990 1.062 ..P WKT 2010 10 31 07 59 55 31.3200 -97.3300 251.000 30.0 159.973 5.180 -999.990 -999.990 1.600 ..P WKT 2010 10 31 08 04 55 31.3200 -97.3300 251.000 122.0 146.636 4.920 -999.990 -999.990 1.466 ..P WKT 2010 10 31 08 09 55 31.3200 -97.3300 251.000 457.0 103.271 4.800 -999.990 -999.990 1.033 ..P WKT 2010 10 31 08 14 55 31.3200 -97.3300 251.000 30.0 152.435 4.850 -999.990 -999.990 1.524 ..P WKT 2010 10 31 08 19 55 31.3200 -97.3300 251.000 122.0 140.186 4.710 -999.990 -999.990 1.402 ..P WKT 2010 10 31 08 24 55 31.3200 -97.3300 251.000 457.0 109.821 4.680 -999.990 -999.990 1.098 ..P WKT 2010 10 31 08 34 55 31.3200 -97.3300 251.000 30.0 155.603 4.800 -999.990 -999.990 1.556 ..P WKT 2010 10 31 08 39 55 31.3200 -97.3300 251.000 122.0 143.862 4.710 -999.990 -999.990 1.439 ..P WKT 2010 10 31 08 44 55 31.3200 -97.3300 251.000 457.0 107.527 4.900 -999.990 -999.990 1.075 ..P WKT 2010 10 31 08 49 55 31.3200 -97.3300 251.000 30.0 148.499 5.640 -999.990 -999.990 1.485 ..P WKT 2010 10 31 08 54 55 31.3200 -97.3300 251.000 122.0 137.033 5.540 -999.990 -999.990 1.370 ..P WKT 2010 10 31 08 59 55 31.3200 -97.3300 251.000 457.0 103.145 4.770 -999.990 -999.990 1.031 ..P WKT 2010 10 31 09 09 55 31.3200 -97.3300 251.000 30.0 141.768 4.790 -999.990 -999.990 1.418 ..P WKT 2010 10 31 09 14 55 31.3200 -97.3300 251.000 122.0 133.763 4.960 -999.990 -999.990 1.338 ..P WKT 2010 10 31 09 19 55 31.3200 -97.3300 251.000 457.0 108.747 5.690 -999.990 -999.990 1.087 ..P WKT 2010 10 31 09 24 55 31.3200 -97.3300 251.000 30.0 145.573 4.800 -999.990 -999.990 1.456 ..P WKT 2010 10 31 09 29 55 31.3200 -97.3300 251.000 122.0 131.091 4.600 -999.990 -999.990 1.311 ..P WKT 2010 10 31 09 34 55 31.3200 -97.3300 251.000 457.0 114.994 4.710 -999.990 -999.990 1.150 ..P WKT 2010 10 31 09 44 55 31.3200 -97.3300 251.000 30.0 145.250 4.990 -999.990 -999.990 1.453 ..P WKT 2010 10 31 09 49 55 31.3200 -97.3300 251.000 122.0 133.706 5.030 -999.990 -999.990 1.337 ..P WKT 2010 10 31 09 54 55 31.3200 -97.3300 251.000 457.0 108.539 4.520 -999.990 -999.990 1.085 ..P WKT 2010 10 31 09 59 55 31.3200 -97.3300 251.000 30.0 145.967 5.710 -999.990 -999.990 1.460 ..P WKT 2010 10 31 10 04 55 31.3200 -97.3300 251.000 122.0 131.324 4.950 -999.990 -999.990 1.313 ..P WKT 2010 10 31 10 09 55 31.3200 -97.3300 251.000 457.0 109.539 4.340 -999.990 -999.990 1.095 ..P WKT 2010 10 31 10 19 55 31.3200 -97.3300 251.000 30.0 134.416 5.240 -999.990 -999.990 1.344 ..P WKT 2010 10 31 10 24 55 31.3200 -97.3300 251.000 122.0 132.666 4.500 -999.990 -999.990 1.327 ..P WKT 2010 10 31 10 29 55 31.3200 -97.3300 251.000 457.0 107.060 4.340 -999.990 -999.990 1.071 ..P WKT 2010 10 31 10 34 55 31.3200 -97.3300 251.000 30.0 131.054 4.930 -999.990 -999.990 1.311 ..P WKT 2010 10 31 10 39 55 31.3200 -97.3300 251.000 122.0 129.036 4.740 -999.990 -999.990 1.290 ..P WKT 2010 10 31 10 44 55 31.3200 -97.3300 251.000 457.0 104.384 5.250 -999.990 -999.990 1.044 ..P WKT 2010 10 31 10 54 55 31.3200 -97.3300 251.000 30.0 133.645 4.680 -999.990 -999.990 1.336 ..P WKT 2010 10 31 10 59 55 31.3200 -97.3300 251.000 122.0 131.378 4.620 -999.990 -999.990 1.314 ..P WKT 2010 10 31 11 04 55 31.3200 -97.3300 251.000 457.0 106.353 4.510 -999.990 -999.990 1.064 ..P WKT 2010 10 31 11 09 55 31.3200 -97.3300 251.000 30.0 129.403 4.880 -999.990 -999.990 1.294 ..P WKT 2010 10 31 11 14 55 31.3200 -97.3300 251.000 122.0 125.926 6.440 -999.990 -999.990 1.259 ..P WKT 2010 10 31 11 19 55 31.3200 -97.3300 251.000 457.0 120.430 4.280 -999.990 -999.990 1.204 ..P WKT 2010 10 31 11 29 55 31.3200 -97.3300 251.000 30.0 132.165 4.810 -999.990 -999.990 1.322 ..P WKT 2010 10 31 11 34 55 31.3200 -97.3300 251.000 122.0 133.110 5.780 -999.990 -999.990 1.331 ..P WKT 2010 10 31 11 39 55 31.3200 -97.3300 251.000 457.0 127.328 4.780 -999.990 -999.990 1.273 ..P WKT 2010 10 31 11 44 55 31.3200 -97.3300 251.000 30.0 140.649 4.670 -999.990 -999.990 1.406 ..P WKT 2010 10 31 11 49 55 31.3200 -97.3300 251.000 122.0 133.522 4.240 -999.990 -999.990 1.335 ..P WKT 2010 10 31 12 09 55 31.3200 -97.3300 251.000 457.0 124.044 4.180 -999.990 -999.990 1.240 ..P WKT 2010 10 31 12 10 25 31.3200 -97.3300 251.000 457.0 114.374 5.260 -999.990 -999.990 1.144 ..P WKT 2010 10 31 12 10 55 31.3200 -97.3300 251.000 457.0 114.653 4.800 -999.990 -999.990 1.147 ..P WKT 2010 10 31 12 11 25 31.3200 -97.3300 251.000 457.0 116.546 4.520 -999.990 -999.990 1.165 ..P WKT 2010 10 31 12 11 55 31.3200 -97.3300 251.000 457.0 119.784 4.480 -999.990 -999.990 1.198 ..P WKT 2010 10 31 12 12 25 31.3200 -97.3300 251.000 457.0 121.138 4.070 -999.990 -999.990 1.211 ..P WKT 2010 10 31 12 12 55 31.3200 -97.3300 251.000 457.0 118.728 4.120 -999.990 -999.990 1.187 ..P WKT 2010 10 31 12 13 25 31.3200 -97.3300 251.000 457.0 119.008 4.320 -999.990 -999.990 1.190 ..P WKT 2010 10 31 12 13 55 31.3200 -97.3300 251.000 457.0 117.673 4.040 -999.990 -999.990 1.177 ..P WKT 2010 10 31 12 14 25 31.3200 -97.3300 251.000 457.0 120.372 4.110 -999.990 -999.990 1.204 ..P WKT 2010 10 31 12 14 55 31.3200 -97.3300 251.000 457.0 114.467 4.020 -999.990 -999.990 1.145 ..P WKT 2010 10 31 12 19 55 31.3200 -97.3300 251.000 30.0 130.972 4.120 -999.990 -999.990 1.310 ..P WKT 2010 10 31 12 24 55 31.3200 -97.3300 251.000 122.0 125.428 4.180 -999.990 -999.990 1.254 ..P WKT 2010 10 31 12 29 55 31.3200 -97.3300 251.000 457.0 120.692 3.930 -999.990 -999.990 1.207 ..P WKT 2010 10 31 12 34 55 31.3200 -97.3300 251.000 30.0 132.623 4.860 -999.990 -999.990 1.326 ..P WKT 2010 10 31 12 39 55 31.3200 -97.3300 251.000 122.0 126.543 4.020 -999.990 -999.990 1.265 ..P WKT 2010 10 31 12 44 55 31.3200 -97.3300 251.000 457.0 125.839 4.000 -999.990 -999.990 1.258 ..P WKT 2010 10 31 12 54 55 31.3200 -97.3300 251.000 30.0 138.019 4.530 -999.990 -999.990 1.380 ..P WKT 2010 10 31 12 59 55 31.3200 -97.3300 251.000 122.0 119.997 4.370 -999.990 -999.990 1.200 ..P WKT 2010 10 31 13 04 55 31.3200 -97.3300 251.000 457.0 130.998 4.170 -999.990 -999.990 1.310 ..P WKT 2010 10 31 13 09 55 31.3200 -97.3300 251.000 30.0 128.563 5.120 -999.990 -999.990 1.286 ..P WKT 2010 10 31 13 14 55 31.3200 -97.3300 251.000 122.0 126.666 5.210 -999.990 -999.990 1.267 ..P WKT 2010 10 31 13 19 55 31.3200 -97.3300 251.000 457.0 132.156 4.940 -999.990 -999.990 1.322 ..P WKT 2010 10 31 13 29 55 31.3200 -97.3300 251.000 30.0 135.039 4.230 -999.990 -999.990 1.350 ..P WKT 2010 10 31 13 34 55 31.3200 -97.3300 251.000 122.0 122.761 4.230 -999.990 -999.990 1.228 ..P WKT 2010 10 31 13 39 55 31.3200 -97.3300 251.000 457.0 129.152 4.340 -999.990 -999.990 1.292 ..P WKT 2010 10 31 13 44 55 31.3200 -97.3300 251.000 30.0 140.109 5.150 -999.990 -999.990 1.401 ..P WKT 2010 10 31 13 49 55 31.3200 -97.3300 251.000 122.0 124.610 4.620 -999.990 -999.990 1.246 ..P WKT 2010 10 31 13 54 55 31.3200 -97.3300 251.000 457.0 122.810 4.750 -999.990 -999.990 1.228 ..P WKT 2010 10 31 14 04 55 31.3200 -97.3300 251.000 30.0 131.753 4.390 -999.990 -999.990 1.318 ..P WKT 2010 10 31 14 09 55 31.3200 -97.3300 251.000 122.0 121.955 4.300 -999.990 -999.990 1.220 ..P WKT 2010 10 31 14 14 55 31.3200 -97.3300 251.000 457.0 113.367 4.330 -999.990 -999.990 1.134 ..P WKT 2010 10 31 14 19 55 31.3200 -97.3300 251.000 30.0 122.095 4.300 -999.990 -999.990 1.221 ..P WKT 2010 10 31 14 24 55 31.3200 -97.3300 251.000 122.0 125.990 4.660 -999.990 -999.990 1.260 ..P WKT 2010 10 31 14 29 55 31.3200 -97.3300 251.000 457.0 116.464 4.920 -999.990 -999.990 1.165 ..P WKT 2010 10 31 14 39 55 31.3200 -97.3300 251.000 30.0 122.816 4.930 -999.990 -999.990 1.228 ..P WKT 2010 10 31 14 44 55 31.3200 -97.3300 251.000 122.0 132.920 5.180 -999.990 -999.990 1.329 ..P WKT 2010 10 31 14 49 55 31.3200 -97.3300 251.000 457.0 118.202 5.630 -999.990 -999.990 1.182 ..P WKT 2010 10 31 14 54 55 31.3200 -97.3300 251.000 30.0 126.561 6.410 -999.990 -999.990 1.266 ..P WKT 2010 10 31 14 59 55 31.3200 -97.3300 251.000 122.0 123.517 6.200 -999.990 -999.990 1.235 ..P WKT 2010 10 31 15 04 55 31.3200 -97.3300 251.000 457.0 107.862 5.840 -999.990 -999.990 1.079 ..P WKT 2010 10 31 15 14 55 31.3200 -97.3300 251.000 30.0 131.112 6.500 -999.990 -999.990 1.311 ..P WKT 2010 10 31 15 19 55 31.3200 -97.3300 251.000 122.0 133.261 6.240 -999.990 -999.990 1.333 ..P WKT 2010 10 31 15 24 55 31.3200 -97.3300 251.000 457.0 111.670 6.160 -999.990 -999.990 1.117 ..P WKT 2010 10 31 15 29 55 31.3200 -97.3300 251.000 30.0 131.789 6.380 -999.990 -999.990 1.318 ..P WKT 2010 10 31 15 34 55 31.3200 -97.3300 251.000 122.0 132.059 5.720 -999.990 -999.990 1.321 ..P WKT 2010 10 31 15 39 55 31.3200 -97.3300 251.000 457.0 111.144 6.990 -999.990 -999.990 1.111 ..P WKT 2010 10 31 15 49 55 31.3200 -97.3300 251.000 30.0 136.949 5.760 -999.990 -999.990 1.369 ..P WKT 2010 10 31 15 54 55 31.3200 -97.3300 251.000 122.0 135.668 5.600 -999.990 -999.990 1.357 ..P WKT 2010 10 31 15 59 55 31.3200 -97.3300 251.000 457.0 112.939 4.850 -999.990 -999.990 1.129 ..P WKT 2010 10 31 16 04 55 31.3200 -97.3300 251.000 30.0 131.765 5.290 -999.990 -999.990 1.318 ..P WKT 2010 10 31 16 09 55 31.3200 -97.3300 251.000 122.0 137.723 5.130 -999.990 -999.990 1.377 ..P WKT 2010 10 31 16 14 55 31.3200 -97.3300 251.000 457.0 109.905 4.400 -999.990 -999.990 1.099 ..P WKT 2010 10 31 16 24 55 31.3200 -97.3300 251.000 30.0 135.335 5.300 -999.990 -999.990 1.353 ..P WKT 2010 10 31 16 29 55 31.3200 -97.3300 251.000 122.0 139.530 5.540 -999.990 -999.990 1.395 ..P WKT 2010 10 31 16 34 55 31.3200 -97.3300 251.000 457.0 113.441 5.610 -999.990 -999.990 1.134 ..P WKT 2010 10 31 16 39 55 31.3200 -97.3300 251.000 30.0 138.806 6.470 -999.990 -999.990 1.388 ..P WKT 2010 10 31 16 44 55 31.3200 -97.3300 251.000 122.0 132.280 5.920 -999.990 -999.990 1.323 ..P WKT 2010 10 31 16 49 55 31.3200 -97.3300 251.000 457.0 116.914 5.470 -999.990 -999.990 1.169 ..P WKT 2010 10 31 17 04 55 31.3200 -97.3300 251.000 30.0 123.922 6.900 -999.990 -999.990 1.239 ..P WKT 2010 10 31 17 09 55 31.3200 -97.3300 251.000 122.0 130.418 6.250 -999.990 -999.990 1.304 ..P WKT 2010 10 31 17 14 55 31.3200 -97.3300 251.000 457.0 128.610 7.250 -999.990 -999.990 1.286 ..P WKT 2010 10 31 17 19 55 31.3200 -97.3300 251.000 30.0 125.731 6.840 -999.990 -999.990 1.257 ..P WKT 2010 10 31 17 24 55 31.3200 -97.3300 251.000 122.0 134.769 5.860 -999.990 -999.990 1.348 ..P WKT 2010 10 31 17 29 55 31.3200 -97.3300 251.000 457.0 129.882 7.030 -999.990 -999.990 1.299 ..P WKT 2010 10 31 17 39 55 31.3200 -97.3300 251.000 30.0 135.459 5.200 -999.990 -999.990 1.355 ..P WKT 2010 10 31 17 44 55 31.3200 -97.3300 251.000 122.0 139.898 6.120 -999.990 -999.990 1.399 ..P WKT 2010 10 31 17 49 55 31.3200 -97.3300 251.000 457.0 131.886 6.810 -999.990 -999.990 1.319 ..P WKT 2010 10 31 17 54 55 31.3200 -97.3300 251.000 30.0 134.317 6.680 -999.990 -999.990 1.343 ..P WKT 2010 10 31 17 59 55 31.3200 -97.3300 251.000 122.0 125.237 5.250 -999.990 -999.990 1.252 ..P WKT 2010 10 31 18 04 55 31.3200 -97.3300 251.000 457.0 123.652 4.660 -999.990 -999.990 1.237 ..P WKT 2010 10 31 18 14 55 31.3200 -97.3300 251.000 30.0 121.842 4.670 -999.990 -999.990 1.218 ..P WKT 2010 10 31 18 19 55 31.3200 -97.3300 251.000 122.0 125.094 5.360 -999.990 -999.990 1.251 ..P WKT 2010 10 31 18 24 55 31.3200 -97.3300 251.000 457.0 122.058 4.860 -999.990 -999.990 1.221 ..P WKT 2010 10 31 18 29 55 31.3200 -97.3300 251.000 30.0 121.296 5.050 -999.990 -999.990 1.213 ..P WKT 2010 10 31 18 34 55 31.3200 -97.3300 251.000 122.0 127.759 5.230 -999.990 -999.990 1.278 ..P WKT 2010 10 31 18 39 55 31.3200 -97.3300 251.000 457.0 121.378 4.720 -999.990 -999.990 1.214 ..P WKT 2010 10 31 18 49 55 31.3200 -97.3300 251.000 30.0 121.460 4.810 -999.990 -999.990 1.215 ..P WKT 2010 10 31 18 54 55 31.3200 -97.3300 251.000 122.0 124.444 4.810 -999.990 -999.990 1.244 ..P WKT 2010 10 31 18 59 55 31.3200 -97.3300 251.000 457.0 123.949 5.210 -999.990 -999.990 1.239 ..P WKT 2010 10 31 19 04 55 31.3200 -97.3300 251.000 30.0 122.519 4.800 -999.990 -999.990 1.225 ..P WKT 2010 10 31 19 09 55 31.3200 -97.3300 251.000 122.0 133.526 6.280 -999.990 -999.990 1.335 ..P WKT 2010 10 31 19 14 55 31.3200 -97.3300 251.000 457.0 125.676 4.700 -999.990 -999.990 1.257 ..P WKT 2010 10 31 19 24 55 31.3200 -97.3300 251.000 30.0 126.083 4.630 -999.990 -999.990 1.261 ..P WKT 2010 10 31 19 29 55 31.3200 -97.3300 251.000 122.0 132.865 4.640 -999.990 -999.990 1.329 ..P WKT 2010 10 31 19 34 55 31.3200 -97.3300 251.000 457.0 134.567 5.470 -999.990 -999.990 1.346 ..P WKT 2010 10 31 19 39 55 31.3200 -97.3300 251.000 30.0 129.852 4.710 -999.990 -999.990 1.299 ..P WKT 2010 10 31 19 44 55 31.3200 -97.3300 251.000 122.0 139.574 4.710 -999.990 -999.990 1.396 ..P WKT 2010 10 31 19 49 55 31.3200 -97.3300 251.000 457.0 130.582 4.770 -999.990 -999.990 1.306 ..P WKT 2010 10 31 19 59 55 31.3200 -97.3300 251.000 30.0 131.655 5.520 -999.990 -999.990 1.317 ..P WKT 2010 10 31 20 04 55 31.3200 -97.3300 251.000 122.0 136.373 4.740 -999.990 -999.990 1.364 ..P WKT 2010 10 31 20 09 55 31.3200 -97.3300 251.000 457.0 127.460 4.810 -999.990 -999.990 1.275 ..P WKT 2010 10 31 20 14 55 31.3200 -97.3300 251.000 30.0 129.505 5.400 -999.990 -999.990 1.295 ..P WKT 2010 10 31 20 19 55 31.3200 -97.3300 251.000 122.0 133.954 4.920 -999.990 -999.990 1.340 ..P WKT 2010 10 31 20 24 55 31.3200 -97.3300 251.000 457.0 133.327 4.980 -999.990 -999.990 1.333 ..P WKT 2010 10 31 20 34 55 31.3200 -97.3300 251.000 30.0 127.911 5.080 -999.990 -999.990 1.279 ..P WKT 2010 10 31 20 39 55 31.3200 -97.3300 251.000 122.0 132.207 4.780 -999.990 -999.990 1.322 ..P WKT 2010 10 31 20 44 55 31.3200 -97.3300 251.000 457.0 129.290 5.500 -999.990 -999.990 1.293 ..P WKT 2010 10 31 20 49 55 31.3200 -97.3300 251.000 30.0 128.776 5.500 -999.990 -999.990 1.288 ..P WKT 2010 10 31 20 54 55 31.3200 -97.3300 251.000 122.0 133.873 5.530 -999.990 -999.990 1.339 ..P WKT 2010 10 31 20 59 55 31.3200 -97.3300 251.000 457.0 115.466 4.720 -999.990 -999.990 1.155 ..P WKT 2010 10 31 21 09 55 31.3200 -97.3300 251.000 30.0 127.088 5.060 -999.990 -999.990 1.271 ..P WKT 2010 10 31 21 14 55 31.3200 -97.3300 251.000 122.0 126.404 6.590 -999.990 -999.990 1.264 ..P WKT 2010 10 31 21 19 55 31.3200 -97.3300 251.000 457.0 127.989 5.790 -999.990 -999.990 1.280 ..P WKT 2010 10 31 21 24 55 31.3200 -97.3300 251.000 30.0 128.106 5.440 -999.990 -999.990 1.281 ..P WKT 2010 10 31 21 29 55 31.3200 -97.3300 251.000 122.0 138.368 5.460 -999.990 -999.990 1.384 ..P WKT 2010 10 31 21 34 55 31.3200 -97.3300 251.000 457.0 139.018 5.290 -999.990 -999.990 1.390 ..P WKT 2010 10 31 21 44 55 31.3200 -97.3300 251.000 30.0 134.656 5.130 -999.990 -999.990 1.347 ..P WKT 2010 10 31 21 49 55 31.3200 -97.3300 251.000 122.0 139.652 5.240 -999.990 -999.990 1.397 ..P WKT 2010 10 31 21 54 55 31.3200 -97.3300 251.000 457.0 138.243 5.220 -999.990 -999.990 1.382 ..P WKT 2010 10 31 21 59 55 31.3200 -97.3300 251.000 30.0 135.100 5.090 -999.990 -999.990 1.351 ..P WKT 2010 10 31 22 04 55 31.3200 -97.3300 251.000 122.0 128.487 5.060 -999.990 -999.990 1.285 ..P WKT 2010 10 31 22 09 55 31.3200 -97.3300 251.000 457.0 135.218 5.520 -999.990 -999.990 1.352 ..P WKT 2010 10 31 22 19 55 31.3200 -97.3300 251.000 30.0 136.288 4.940 -999.990 -999.990 1.363 ..P WKT 2010 10 31 22 24 55 31.3200 -97.3300 251.000 122.0 138.634 5.790 -999.990 -999.990 1.386 ..P WKT 2010 10 31 22 29 55 31.3200 -97.3300 251.000 457.0 139.246 4.990 -999.990 -999.990 1.392 ..P WKT 2010 10 31 22 34 55 31.3200 -97.3300 251.000 30.0 137.456 5.640 -999.990 -999.990 1.375 ..P WKT 2010 10 31 22 39 55 31.3200 -97.3300 251.000 122.0 132.733 5.050 -999.990 -999.990 1.327 ..P WKT 2010 10 31 22 44 55 31.3200 -97.3300 251.000 457.0 129.878 5.650 -999.990 -999.990 1.299 ..P WKT 2010 10 31 22 54 55 31.3200 -97.3300 251.000 30.0 133.463 5.240 -999.990 -999.990 1.335 ..P WKT 2010 10 31 22 59 55 31.3200 -97.3300 251.000 122.0 133.636 5.450 -999.990 -999.990 1.336 ..P WKT 2010 10 31 23 04 55 31.3200 -97.3300 251.000 457.0 128.877 5.550 -999.990 -999.990 1.289 ..P WKT 2010 10 31 23 09 55 31.3200 -97.3300 251.000 30.0 136.249 5.100 -999.990 -999.990 1.362 ..P WKT 2010 10 31 23 14 55 31.3200 -97.3300 251.000 122.0 134.157 5.560 -999.990 -999.990 1.342 ..P WKT 2010 10 31 23 19 55 31.3200 -97.3300 251.000 457.0 133.130 6.000 -999.990 -999.990 1.331 ..P WKT 2010 10 31 23 29 55 31.3200 -97.3300 251.000 30.0 141.150 5.120 -999.990 -999.990 1.411 ..P WKT 2010 10 31 23 34 55 31.3200 -97.3300 251.000 122.0 141.932 5.030 -999.990 -999.990 1.419 ..P WKT 2010 10 31 23 39 55 31.3200 -97.3300 251.000 457.0 130.454 5.650 -999.990 -999.990 1.305 ..P WKT 2010 10 31 23 44 55 31.3200 -97.3300 251.000 30.0 141.097 6.990 -999.990 -999.990 1.411 ..P WKT 2010 10 31 23 49 55 31.3200 -97.3300 251.000 122.0 147.475 6.670 -999.990 -999.990 1.475 ..P