# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-06-02 08:40:10 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO (In Situ) # Arlyn Andrews # tel: (303) 497-6773 # email: Arlyn.Andrews@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "Blackland Research and Extension Center-Texas Agricultural # Experiment Station" without whom these measurements would not # be possible. # # URL: http://www.pinnacletowers.com/ # # Sensors were installed on the KWKT-TV transmitter tower in February # 2001. In May 2006, this site became the first to use our newly # redesigned instrumentation suite. The upgrades were made in # time for the Texas Air Quality Study 2006 . We also carried # out a demonstration study during 2006 where an O3 sensor was # mounted at our highest sampling level (457 m above ground level). # The O3 data showed clear evidence of nighttime transport of # ozone in the nocturnal jet at the top of the planetary boundary # layer. This site periodically samples air that has passed over # the Dallas - Fort Worth and Houston metropolitan areas. At other # times, the site samples relatively clean air from the Gulf of # Mexico. Summertime weather patterns are dominated by a monsoonal # circulation over the Gulf. WKT thus provides a measurement of # the initial CO2 concentration for air passing over the continent # from the south. As air moves northward, the CO2 concentration # is modified by the action of sources (fossil fuel combustion, # plant respiration, biomass burning, cement production) and sinks # (photosynthesis). Partners: Blackland Research and Extension # Center-Texas Agricultural Experiment Station (Onyango Okello). # # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # code yr mo dy hr mn sc lat lon elev(masl) ht(magl) value totunc atmvar measunc scaleunc flag WKT 2010 12 01 00 09 55 31.3200 -97.3300 251.000 457.0 122.646 2.610 -999.990 -999.990 1.226 ..P WKT 2010 12 01 00 10 25 31.3200 -97.3300 251.000 457.0 123.693 2.880 -999.990 -999.990 1.237 ..P WKT 2010 12 01 00 10 55 31.3200 -97.3300 251.000 457.0 125.007 2.860 -999.990 -999.990 1.250 ..P WKT 2010 12 01 00 11 25 31.3200 -97.3300 251.000 457.0 117.784 5.540 -999.990 -999.990 1.178 ..P WKT 2010 12 01 00 11 55 31.3200 -97.3300 251.000 457.0 118.031 3.210 -999.990 -999.990 1.180 ..P WKT 2010 12 01 00 12 25 31.3200 -97.3300 251.000 457.0 114.543 3.430 -999.990 -999.990 1.145 ..P WKT 2010 12 01 00 12 55 31.3200 -97.3300 251.000 457.0 115.057 2.690 -999.990 -999.990 1.151 ..P WKT 2010 12 01 00 13 25 31.3200 -97.3300 251.000 457.0 120.372 3.220 -999.990 -999.990 1.204 ..P WKT 2010 12 01 00 13 55 31.3200 -97.3300 251.000 457.0 120.886 2.850 -999.990 -999.990 1.209 ..P WKT 2010 12 01 00 14 25 31.3200 -97.3300 251.000 457.0 119.266 3.390 -999.990 -999.990 1.193 ..P WKT 2010 12 01 00 14 55 31.3200 -97.3300 251.000 457.0 117.645 2.760 -999.990 -999.990 1.176 ..P WKT 2010 12 01 00 19 55 31.3200 -97.3300 251.000 30.0 118.780 3.920 -999.990 -999.990 1.188 ..P WKT 2010 12 01 00 24 55 31.3200 -97.3300 251.000 122.0 119.382 4.590 -999.990 -999.990 1.194 ..P WKT 2010 12 01 00 29 55 31.3200 -97.3300 251.000 457.0 118.115 3.640 -999.990 -999.990 1.181 ..P WKT 2010 12 01 00 34 55 31.3200 -97.3300 251.000 30.0 129.123 3.280 -999.990 -999.990 1.291 ..P WKT 2010 12 01 00 39 55 31.3200 -97.3300 251.000 122.0 124.388 3.490 -999.990 -999.990 1.244 ..P WKT 2010 12 01 00 44 55 31.3200 -97.3300 251.000 457.0 116.184 2.990 -999.990 -999.990 1.162 ..P WKT 2010 12 01 00 54 55 31.3200 -97.3300 251.000 30.0 130.290 3.050 -999.990 -999.990 1.303 ..P WKT 2010 12 01 00 59 55 31.3200 -97.3300 251.000 122.0 124.313 3.800 -999.990 -999.990 1.243 ..P WKT 2010 12 01 01 04 55 31.3200 -97.3300 251.000 457.0 121.538 3.980 -999.990 -999.990 1.215 ..P WKT 2010 12 01 01 09 55 31.3200 -97.3300 251.000 30.0 120.098 4.290 -999.990 -999.990 1.201 ..P WKT 2010 12 01 01 14 55 31.3200 -97.3300 251.000 122.0 123.463 3.740 -999.990 -999.990 1.235 ..P WKT 2010 12 01 01 19 55 31.3200 -97.3300 251.000 457.0 120.420 3.400 -999.990 -999.990 1.204 ..P WKT 2010 12 01 01 29 55 31.3200 -97.3300 251.000 30.0 121.315 3.030 -999.990 -999.990 1.213 ..P WKT 2010 12 01 01 34 55 31.3200 -97.3300 251.000 122.0 123.115 3.900 -999.990 -999.990 1.231 ..P WKT 2010 12 01 01 39 55 31.3200 -97.3300 251.000 457.0 124.116 4.120 -999.990 -999.990 1.241 ..P WKT 2010 12 01 01 44 55 31.3200 -97.3300 251.000 30.0 122.180 3.690 -999.990 -999.990 1.222 ..P WKT 2010 12 01 01 49 55 31.3200 -97.3300 251.000 122.0 116.772 3.300 -999.990 -999.990 1.168 ..P WKT 2010 12 01 01 54 55 31.3200 -97.3300 251.000 457.0 123.112 2.970 -999.990 -999.990 1.231 ..P WKT 2010 12 01 02 04 55 31.3200 -97.3300 251.000 30.0 123.664 4.560 -999.990 -999.990 1.237 ..P WKT 2010 12 01 02 09 55 31.3200 -97.3300 251.000 122.0 112.266 3.040 -999.990 -999.990 1.123 ..P WKT 2010 12 01 02 14 55 31.3200 -97.3300 251.000 457.0 119.428 3.420 -999.990 -999.990 1.194 ..P WKT 2010 12 01 02 19 55 31.3200 -97.3300 251.000 30.0 120.981 4.900 -999.990 -999.990 1.210 ..P WKT 2010 12 01 02 24 55 31.3200 -97.3300 251.000 122.0 118.129 4.330 -999.990 -999.990 1.181 ..P WKT 2010 12 01 02 29 55 31.3200 -97.3300 251.000 457.0 111.536 4.020 -999.990 -999.990 1.115 ..P WKT 2010 12 01 02 39 55 31.3200 -97.3300 251.000 30.0 119.642 3.450 -999.990 -999.990 1.196 ..P WKT 2010 12 01 02 44 55 31.3200 -97.3300 251.000 122.0 121.120 3.650 -999.990 -999.990 1.211 ..P WKT 2010 12 01 02 49 55 31.3200 -97.3300 251.000 457.0 119.258 3.320 -999.990 -999.990 1.193 ..P WKT 2010 12 01 02 54 55 31.3200 -97.3300 251.000 30.0 120.069 3.870 -999.990 -999.990 1.201 ..P WKT 2010 12 01 02 59 55 31.3200 -97.3300 251.000 122.0 117.806 3.270 -999.990 -999.990 1.178 ..P WKT 2010 12 01 03 04 55 31.3200 -97.3300 251.000 457.0 124.227 3.610 -999.990 -999.990 1.242 ..P WKT 2010 12 01 03 14 55 31.3200 -97.3300 251.000 30.0 121.248 3.030 -999.990 -999.990 1.212 ..P WKT 2010 12 01 03 19 55 31.3200 -97.3300 251.000 122.0 122.535 3.320 -999.990 -999.990 1.225 ..P WKT 2010 12 01 03 24 55 31.3200 -97.3300 251.000 457.0 122.353 3.790 -999.990 -999.990 1.224 ..P WKT 2010 12 01 03 29 55 31.3200 -97.3300 251.000 30.0 123.774 3.340 -999.990 -999.990 1.238 ..P WKT 2010 12 01 03 34 55 31.3200 -97.3300 251.000 122.0 120.519 3.090 -999.990 -999.990 1.205 ..P WKT 2010 12 01 03 39 55 31.3200 -97.3300 251.000 457.0 117.397 3.470 -999.990 -999.990 1.174 ..P WKT 2010 12 01 03 49 55 31.3200 -97.3300 251.000 30.0 125.584 3.320 -999.990 -999.990 1.256 ..P WKT 2010 12 01 03 54 55 31.3200 -97.3300 251.000 122.0 129.278 3.130 -999.990 -999.990 1.293 ..P WKT 2010 12 01 03 59 55 31.3200 -97.3300 251.000 457.0 118.939 3.990 -999.990 -999.990 1.189 ..P WKT 2010 12 01 04 04 55 31.3200 -97.3300 251.000 30.0 127.444 3.440 -999.990 -999.990 1.274 ..P WKT 2010 12 01 04 09 55 31.3200 -97.3300 251.000 122.0 126.327 3.140 -999.990 -999.990 1.263 ..P WKT 2010 12 01 04 14 55 31.3200 -97.3300 251.000 457.0 119.595 3.090 -999.990 -999.990 1.196 ..P WKT 2010 12 01 04 24 55 31.3200 -97.3300 251.000 30.0 123.679 3.290 -999.990 -999.990 1.237 ..P WKT 2010 12 01 04 29 55 31.3200 -97.3300 251.000 122.0 127.813 3.010 -999.990 -999.990 1.278 ..P WKT 2010 12 01 04 34 55 31.3200 -97.3300 251.000 457.0 126.867 4.110 -999.990 -999.990 1.269 ..P WKT 2010 12 01 04 39 55 31.3200 -97.3300 251.000 30.0 125.653 3.200 -999.990 -999.990 1.257 ..P WKT 2010 12 01 04 44 55 31.3200 -97.3300 251.000 122.0 124.173 2.690 -999.990 -999.990 1.242 ..P WKT 2010 12 01 04 49 55 31.3200 -97.3300 251.000 457.0 119.215 3.210 -999.990 -999.990 1.192 ..P WKT 2010 12 01 05 04 55 31.3200 -97.3300 251.000 30.0 131.124 3.860 -999.990 -999.990 1.311 ..P WKT 2010 12 01 05 09 55 31.3200 -97.3300 251.000 122.0 127.522 2.890 -999.990 -999.990 1.275 ..P WKT 2010 12 01 05 14 55 31.3200 -97.3300 251.000 457.0 122.582 6.430 -999.990 -999.990 1.226 ..P WKT 2010 12 01 05 19 55 31.3200 -97.3300 251.000 30.0 123.527 3.360 -999.990 -999.990 1.235 ..P WKT 2010 12 01 05 24 55 31.3200 -97.3300 251.000 122.0 125.810 3.600 -999.990 -999.990 1.258 ..P WKT 2010 12 01 05 29 55 31.3200 -97.3300 251.000 457.0 123.277 3.700 -999.990 -999.990 1.233 ..P WKT 2010 12 01 05 39 55 31.3200 -97.3300 251.000 30.0 120.390 4.250 -999.990 -999.990 1.204 ..P WKT 2010 12 01 05 44 55 31.3200 -97.3300 251.000 122.0 120.036 4.420 -999.990 -999.990 1.200 ..P WKT 2010 12 01 05 49 55 31.3200 -97.3300 251.000 457.0 119.280 4.090 -999.990 -999.990 1.193 ..P WKT 2010 12 01 05 54 55 31.3200 -97.3300 251.000 30.0 126.016 3.860 -999.990 -999.990 1.260 ..P WKT 2010 12 01 05 59 55 31.3200 -97.3300 251.000 122.0 122.718 3.870 -999.990 -999.990 1.227 ..P WKT 2010 12 01 06 04 55 31.3200 -97.3300 251.000 457.0 122.497 4.270 -999.990 -999.990 1.225 ..P WKT 2010 12 01 06 14 55 31.3200 -97.3300 251.000 30.0 126.186 4.260 -999.990 -999.990 1.262 ..P WKT 2010 12 01 06 19 55 31.3200 -97.3300 251.000 122.0 118.050 3.740 -999.990 -999.990 1.181 ..P WKT 2010 12 01 06 24 55 31.3200 -97.3300 251.000 457.0 123.297 3.650 -999.990 -999.990 1.233 ..P WKT 2010 12 01 06 29 55 31.3200 -97.3300 251.000 30.0 124.797 3.710 -999.990 -999.990 1.248 ..P WKT 2010 12 01 06 34 55 31.3200 -97.3300 251.000 122.0 120.542 3.470 -999.990 -999.990 1.205 ..P WKT 2010 12 01 06 39 55 31.3200 -97.3300 251.000 457.0 126.325 3.670 -999.990 -999.990 1.263 ..P WKT 2010 12 01 06 49 55 31.3200 -97.3300 251.000 30.0 127.777 4.300 -999.990 -999.990 1.278 ..P WKT 2010 12 01 06 54 55 31.3200 -97.3300 251.000 122.0 126.792 3.740 -999.990 -999.990 1.268 ..P WKT 2010 12 01 06 59 55 31.3200 -97.3300 251.000 457.0 122.459 4.160 -999.990 -999.990 1.225 ..P WKT 2010 12 01 07 04 55 31.3200 -97.3300 251.000 30.0 141.421 4.920 -999.990 -999.990 1.414 ..P WKT 2010 12 01 07 09 55 31.3200 -97.3300 251.000 122.0 126.913 3.550 -999.990 -999.990 1.269 ..P WKT 2010 12 01 07 14 55 31.3200 -97.3300 251.000 457.0 126.329 4.270 -999.990 -999.990 1.263 ..P WKT 2010 12 01 07 24 55 31.3200 -97.3300 251.000 30.0 123.000 3.670 -999.990 -999.990 1.230 ..P WKT 2010 12 01 07 29 55 31.3200 -97.3300 251.000 122.0 121.325 4.220 -999.990 -999.990 1.213 ..P WKT 2010 12 01 07 34 55 31.3200 -97.3300 251.000 457.0 119.248 3.670 -999.990 -999.990 1.192 ..P WKT 2010 12 01 07 39 55 31.3200 -97.3300 251.000 30.0 119.984 4.530 -999.990 -999.990 1.200 ..P WKT 2010 12 01 07 44 55 31.3200 -97.3300 251.000 122.0 120.184 4.360 -999.990 -999.990 1.202 ..P WKT 2010 12 01 07 49 55 31.3200 -97.3300 251.000 457.0 117.304 3.500 -999.990 -999.990 1.173 ..P WKT 2010 12 01 07 59 55 31.3200 -97.3300 251.000 30.0 118.431 2.870 -999.990 -999.990 1.184 ..P WKT 2010 12 01 08 04 55 31.3200 -97.3300 251.000 122.0 118.822 4.120 -999.990 -999.990 1.188 ..P WKT 2010 12 01 08 09 55 31.3200 -97.3300 251.000 457.0 114.659 5.280 -999.990 -999.990 1.147 ..P WKT 2010 12 01 08 14 55 31.3200 -97.3300 251.000 30.0 130.589 4.250 -999.990 -999.990 1.306 ..P WKT 2010 12 01 08 19 55 31.3200 -97.3300 251.000 122.0 120.264 3.680 -999.990 -999.990 1.203 ..P WKT 2010 12 01 08 24 55 31.3200 -97.3300 251.000 457.0 119.048 3.790 -999.990 -999.990 1.190 ..P WKT 2010 12 01 08 34 55 31.3200 -97.3300 251.000 30.0 153.976 2.960 -999.990 -999.990 1.540 ..P WKT 2010 12 01 08 39 55 31.3200 -97.3300 251.000 122.0 117.771 2.690 -999.990 -999.990 1.178 ..P WKT 2010 12 01 08 44 55 31.3200 -97.3300 251.000 457.0 124.709 3.010 -999.990 -999.990 1.247 ..P WKT 2010 12 01 08 49 55 31.3200 -97.3300 251.000 30.0 160.592 3.640 -999.990 -999.990 1.606 ..P WKT 2010 12 01 08 54 55 31.3200 -97.3300 251.000 122.0 128.134 3.010 -999.990 -999.990 1.281 ..P WKT 2010 12 01 08 59 55 31.3200 -97.3300 251.000 457.0 124.084 2.740 -999.990 -999.990 1.241 ..P WKT 2010 12 01 09 09 55 31.3200 -97.3300 251.000 30.0 150.371 3.190 -999.990 -999.990 1.504 ..P WKT 2010 12 01 09 14 55 31.3200 -97.3300 251.000 122.0 120.664 3.040 -999.990 -999.990 1.207 ..P WKT 2010 12 01 09 19 55 31.3200 -97.3300 251.000 457.0 123.661 3.420 -999.990 -999.990 1.237 ..P WKT 2010 12 01 09 24 55 31.3200 -97.3300 251.000 30.0 154.000 3.250 -999.990 -999.990 1.540 ..P WKT 2010 12 01 09 29 55 31.3200 -97.3300 251.000 122.0 110.886 3.040 -999.990 -999.990 1.109 ..P WKT 2010 12 01 09 34 55 31.3200 -97.3300 251.000 457.0 128.628 3.260 -999.990 -999.990 1.286 ..P WKT 2010 12 01 09 44 55 31.3200 -97.3300 251.000 30.0 144.484 3.860 -999.990 -999.990 1.445 ..P WKT 2010 12 01 09 49 55 31.3200 -97.3300 251.000 122.0 124.498 3.480 -999.990 -999.990 1.245 ..P WKT 2010 12 01 09 54 55 31.3200 -97.3300 251.000 457.0 124.086 3.210 -999.990 -999.990 1.241 ..P WKT 2010 12 01 09 59 55 31.3200 -97.3300 251.000 30.0 132.523 3.450 -999.990 -999.990 1.325 ..P WKT 2010 12 01 10 04 55 31.3200 -97.3300 251.000 122.0 113.070 3.430 -999.990 -999.990 1.131 ..P WKT 2010 12 01 10 09 55 31.3200 -97.3300 251.000 457.0 118.557 4.420 -999.990 -999.990 1.186 ..P WKT 2010 12 01 10 19 55 31.3200 -97.3300 251.000 30.0 140.797 3.460 -999.990 -999.990 1.408 ..P WKT 2010 12 01 10 24 55 31.3200 -97.3300 251.000 122.0 122.549 4.220 -999.990 -999.990 1.225 ..P WKT 2010 12 01 10 29 55 31.3200 -97.3300 251.000 457.0 121.331 3.710 -999.990 -999.990 1.213 ..P WKT 2010 12 01 10 34 55 31.3200 -97.3300 251.000 30.0 133.392 3.710 -999.990 -999.990 1.334 ..P WKT 2010 12 01 10 39 55 31.3200 -97.3300 251.000 122.0 112.860 5.330 -999.990 -999.990 1.129 ..P WKT 2010 12 01 10 44 55 31.3200 -97.3300 251.000 457.0 120.897 3.780 -999.990 -999.990 1.209 ..P WKT 2010 12 01 10 54 55 31.3200 -97.3300 251.000 30.0 142.914 4.610 -999.990 -999.990 1.429 ..P WKT 2010 12 01 10 59 55 31.3200 -97.3300 251.000 122.0 125.503 5.040 -999.990 -999.990 1.255 ..P WKT 2010 12 01 11 04 55 31.3200 -97.3300 251.000 457.0 125.665 3.510 -999.990 -999.990 1.257 ..P WKT 2010 12 01 11 09 55 31.3200 -97.3300 251.000 30.0 151.453 4.150 -999.990 -999.990 1.515 ..P WKT 2010 12 01 11 14 55 31.3200 -97.3300 251.000 122.0 121.428 4.140 -999.990 -999.990 1.214 ..P WKT 2010 12 01 11 19 55 31.3200 -97.3300 251.000 457.0 127.359 2.850 -999.990 -999.990 1.274 ..P WKT 2010 12 01 11 29 55 31.3200 -97.3300 251.000 30.0 139.054 3.130 -999.990 -999.990 1.391 ..P WKT 2010 12 01 11 34 55 31.3200 -97.3300 251.000 122.0 127.506 4.130 -999.990 -999.990 1.275 ..P WKT 2010 12 01 11 39 55 31.3200 -97.3300 251.000 457.0 130.988 4.170 -999.990 -999.990 1.310 ..P WKT 2010 12 01 11 44 55 31.3200 -97.3300 251.000 30.0 142.119 4.420 -999.990 -999.990 1.421 ..P WKT 2010 12 01 11 49 55 31.3200 -97.3300 251.000 122.0 127.483 3.370 -999.990 -999.990 1.275 ..P WKT 2010 12 01 12 09 55 31.3200 -97.3300 251.000 457.0 118.904 2.980 -999.990 -999.990 1.189 ..P WKT 2010 12 01 12 10 25 31.3200 -97.3300 251.000 457.0 126.093 2.940 -999.990 -999.990 1.261 ..P WKT 2010 12 01 12 10 55 31.3200 -97.3300 251.000 457.0 126.569 3.160 -999.990 -999.990 1.266 ..P WKT 2010 12 01 12 11 25 31.3200 -97.3300 251.000 457.0 123.824 3.330 -999.990 -999.990 1.238 ..P WKT 2010 12 01 12 11 55 31.3200 -97.3300 251.000 457.0 123.763 3.060 -999.990 -999.990 1.238 ..P WKT 2010 12 01 12 12 25 31.3200 -97.3300 251.000 457.0 126.119 3.340 -999.990 -999.990 1.261 ..P WKT 2010 12 01 12 12 55 31.3200 -97.3300 251.000 457.0 122.300 3.010 -999.990 -999.990 1.223 ..P WKT 2010 12 01 12 13 25 31.3200 -97.3300 251.000 457.0 124.925 3.160 -999.990 -999.990 1.249 ..P WKT 2010 12 01 12 13 55 31.3200 -97.3300 251.000 457.0 122.716 3.070 -999.990 -999.990 1.227 ..P WKT 2010 12 01 12 14 25 31.3200 -97.3300 251.000 457.0 123.998 3.900 -999.990 -999.990 1.240 ..P WKT 2010 12 01 12 14 55 31.3200 -97.3300 251.000 457.0 125.549 3.680 -999.990 -999.990 1.255 ..P WKT 2010 12 01 12 19 55 31.3200 -97.3300 251.000 30.0 131.120 4.650 -999.990 -999.990 1.311 ..P WKT 2010 12 01 12 24 55 31.3200 -97.3300 251.000 122.0 117.090 3.900 -999.990 -999.990 1.171 ..P WKT 2010 12 01 12 29 55 31.3200 -97.3300 251.000 457.0 125.616 5.340 -999.990 -999.990 1.256 ..P WKT 2010 12 01 12 34 55 31.3200 -97.3300 251.000 30.0 133.336 4.020 -999.990 -999.990 1.333 ..P WKT 2010 12 01 12 39 55 31.3200 -97.3300 251.000 122.0 117.693 3.230 -999.990 -999.990 1.177 ..P WKT 2010 12 01 12 44 55 31.3200 -97.3300 251.000 457.0 119.505 3.110 -999.990 -999.990 1.195 ..P WKT 2010 12 01 12 54 55 31.3200 -97.3300 251.000 30.0 121.770 3.900 -999.990 -999.990 1.218 ..P WKT 2010 12 01 12 59 55 31.3200 -97.3300 251.000 122.0 120.880 4.070 -999.990 -999.990 1.209 ..P WKT 2010 12 01 13 04 55 31.3200 -97.3300 251.000 457.0 122.139 4.570 -999.990 -999.990 1.221 ..P WKT 2010 12 01 13 09 55 31.3200 -97.3300 251.000 30.0 127.428 3.940 -999.990 -999.990 1.274 ..P WKT 2010 12 01 13 14 55 31.3200 -97.3300 251.000 122.0 126.806 3.650 -999.990 -999.990 1.268 ..P WKT 2010 12 01 13 19 55 31.3200 -97.3300 251.000 457.0 128.603 3.570 -999.990 -999.990 1.286 ..P WKT 2010 12 01 13 29 55 31.3200 -97.3300 251.000 30.0 133.061 3.350 -999.990 -999.990 1.331 ..P WKT 2010 12 01 13 34 55 31.3200 -97.3300 251.000 122.0 125.778 3.590 -999.990 -999.990 1.258 ..P WKT 2010 12 01 13 39 55 31.3200 -97.3300 251.000 457.0 129.111 3.910 -999.990 -999.990 1.291 ..P WKT 2010 12 01 13 44 55 31.3200 -97.3300 251.000 30.0 131.504 3.690 -999.990 -999.990 1.315 ..P WKT 2010 12 01 13 49 55 31.3200 -97.3300 251.000 122.0 122.204 3.810 -999.990 -999.990 1.222 ..P WKT 2010 12 01 13 54 55 31.3200 -97.3300 251.000 457.0 123.656 3.410 -999.990 -999.990 1.237 ..P WKT 2010 12 01 14 04 55 31.3200 -97.3300 251.000 30.0 136.852 3.540 -999.990 -999.990 1.369 ..P WKT 2010 12 01 14 09 55 31.3200 -97.3300 251.000 122.0 125.745 3.720 -999.990 -999.990 1.257 ..P WKT 2010 12 01 14 14 55 31.3200 -97.3300 251.000 457.0 125.257 4.260 -999.990 -999.990 1.253 ..P WKT 2010 12 01 14 19 55 31.3200 -97.3300 251.000 30.0 137.273 4.300 -999.990 -999.990 1.373 ..P WKT 2010 12 01 14 24 55 31.3200 -97.3300 251.000 122.0 120.115 3.930 -999.990 -999.990 1.201 ..P WKT 2010 12 01 14 29 55 31.3200 -97.3300 251.000 457.0 119.357 3.920 -999.990 -999.990 1.194 ..P WKT 2010 12 01 14 39 55 31.3200 -97.3300 251.000 30.0 129.484 4.080 -999.990 -999.990 1.295 ..P WKT 2010 12 01 14 44 55 31.3200 -97.3300 251.000 122.0 127.864 4.220 -999.990 -999.990 1.279 ..P WKT 2010 12 01 14 49 55 31.3200 -97.3300 251.000 457.0 123.150 4.500 -999.990 -999.990 1.232 ..P WKT 2010 12 01 14 54 55 31.3200 -97.3300 251.000 30.0 141.030 4.680 -999.990 -999.990 1.410 ..P WKT 2010 12 01 14 59 55 31.3200 -97.3300 251.000 122.0 133.087 5.020 -999.990 -999.990 1.331 ..P WKT 2010 12 01 15 04 55 31.3200 -97.3300 251.000 457.0 121.916 4.740 -999.990 -999.990 1.219 ..P WKT 2010 12 01 15 14 55 31.3200 -97.3300 251.000 30.0 138.928 6.460 -999.990 -999.990 1.389 ..P WKT 2010 12 01 15 19 55 31.3200 -97.3300 251.000 122.0 133.482 5.580 -999.990 -999.990 1.335 ..P WKT 2010 12 01 15 24 55 31.3200 -97.3300 251.000 457.0 118.752 7.730 -999.990 -999.990 1.188 ..P WKT 2010 12 01 15 29 55 31.3200 -97.3300 251.000 30.0 146.269 7.440 -999.990 -999.990 1.463 ..P WKT 2010 12 01 15 34 55 31.3200 -97.3300 251.000 122.0 136.786 7.510 -999.990 -999.990 1.368 ..P WKT 2010 12 01 15 39 55 31.3200 -97.3300 251.000 457.0 114.922 7.690 -999.990 -999.990 1.149 ..P WKT 2010 12 01 15 49 55 31.3200 -97.3300 251.000 30.0 135.766 8.300 -999.990 -999.990 1.358 ..P WKT 2010 12 01 15 54 55 31.3200 -97.3300 251.000 122.0 132.452 6.620 -999.990 -999.990 1.325 ..P WKT 2010 12 01 15 59 55 31.3200 -97.3300 251.000 457.0 110.834 6.160 -999.990 -999.990 1.108 ..P WKT 2010 12 01 16 04 55 31.3200 -97.3300 251.000 30.0 129.861 5.190 -999.990 -999.990 1.299 ..P WKT 2010 12 01 16 09 55 31.3200 -97.3300 251.000 122.0 126.546 4.970 -999.990 -999.990 1.265 ..P WKT 2010 12 01 16 14 55 31.3200 -97.3300 251.000 457.0 109.500 5.380 -999.990 -999.990 1.095 ..P WKT 2010 12 01 16 24 55 31.3200 -97.3300 251.000 30.0 135.718 4.290 -999.990 -999.990 1.357 ..P WKT 2010 12 01 16 29 55 31.3200 -97.3300 251.000 122.0 139.942 3.770 -999.990 -999.990 1.399 ..P WKT 2010 12 01 16 34 55 31.3200 -97.3300 251.000 457.0 122.355 3.770 -999.990 -999.990 1.224 ..P WKT 2010 12 01 16 39 55 31.3200 -97.3300 251.000 30.0 150.008 3.890 -999.990 -999.990 1.500 ..P WKT 2010 12 01 16 44 55 31.3200 -97.3300 251.000 122.0 142.922 3.810 -999.990 -999.990 1.429 ..P WKT 2010 12 01 16 49 55 31.3200 -97.3300 251.000 457.0 122.370 3.510 -999.990 -999.990 1.224 ..P WKT 2010 12 01 17 04 55 31.3200 -97.3300 251.000 30.0 131.967 4.960 -999.990 -999.990 1.320 ..P WKT 2010 12 01 17 09 55 31.3200 -97.3300 251.000 122.0 131.826 4.140 -999.990 -999.990 1.318 ..P WKT 2010 12 01 17 14 55 31.3200 -97.3300 251.000 457.0 121.177 5.110 -999.990 -999.990 1.212 ..P WKT 2010 12 01 17 19 55 31.3200 -97.3300 251.000 30.0 134.775 4.910 -999.990 -999.990 1.348 ..P WKT 2010 12 01 17 24 55 31.3200 -97.3300 251.000 122.0 128.706 4.630 -999.990 -999.990 1.287 ..P WKT 2010 12 01 17 29 55 31.3200 -97.3300 251.000 457.0 131.123 5.400 -999.990 -999.990 1.311 ..P WKT 2010 12 01 17 39 55 31.3200 -97.3300 251.000 30.0 131.917 5.070 -999.990 -999.990 1.319 ..P WKT 2010 12 01 17 44 55 31.3200 -97.3300 251.000 122.0 136.222 4.810 -999.990 -999.990 1.362 ..P WKT 2010 12 01 17 49 55 31.3200 -97.3300 251.000 457.0 132.307 5.540 -999.990 -999.990 1.323 ..P WKT 2010 12 01 17 54 55 31.3200 -97.3300 251.000 30.0 127.853 4.800 -999.990 -999.990 1.279 ..P WKT 2010 12 01 17 59 55 31.3200 -97.3300 251.000 122.0 133.237 4.710 -999.990 -999.990 1.332 ..P WKT 2010 12 01 18 04 55 31.3200 -97.3300 251.000 457.0 128.108 4.450 -999.990 -999.990 1.281 ..P WKT 2010 12 01 18 14 55 31.3200 -97.3300 251.000 30.0 129.461 5.390 -999.990 -999.990 1.295 ..P WKT 2010 12 01 18 19 55 31.3200 -97.3300 251.000 122.0 130.551 4.100 -999.990 -999.990 1.306 ..P WKT 2010 12 01 18 24 55 31.3200 -97.3300 251.000 457.0 127.328 4.610 -999.990 -999.990 1.273 ..P WKT 2010 12 01 18 29 55 31.3200 -97.3300 251.000 30.0 127.879 4.330 -999.990 -999.990 1.279 ..P WKT 2010 12 01 18 34 55 31.3200 -97.3300 251.000 122.0 132.880 5.710 -999.990 -999.990 1.329 ..P WKT 2010 12 01 18 39 55 31.3200 -97.3300 251.000 457.0 129.791 4.500 -999.990 -999.990 1.298 ..P WKT 2010 12 01 18 49 55 31.3200 -97.3300 251.000 30.0 125.750 4.660 -999.990 -999.990 1.258 ..P WKT 2010 12 01 18 54 55 31.3200 -97.3300 251.000 122.0 130.597 5.280 -999.990 -999.990 1.306 ..P WKT 2010 12 01 18 59 55 31.3200 -97.3300 251.000 457.0 126.544 3.940 -999.990 -999.990 1.265 ..P WKT 2010 12 01 19 04 55 31.3200 -97.3300 251.000 30.0 121.547 3.960 -999.990 -999.990 1.215 ..P WKT 2010 12 01 19 09 55 31.3200 -97.3300 251.000 122.0 130.305 6.250 -999.990 -999.990 1.303 ..P WKT 2010 12 01 19 14 55 31.3200 -97.3300 251.000 457.0 125.982 4.250 -999.990 -999.990 1.260 ..P WKT 2010 12 01 19 24 55 31.3200 -97.3300 251.000 30.0 123.230 3.580 -999.990 -999.990 1.232 ..P WKT 2010 12 01 19 29 55 31.3200 -97.3300 251.000 122.0 122.375 3.480 -999.990 -999.990 1.224 ..P WKT 2010 12 01 19 34 55 31.3200 -97.3300 251.000 457.0 128.130 3.660 -999.990 -999.990 1.281 ..P WKT 2010 12 01 19 39 55 31.3200 -97.3300 251.000 30.0 119.989 3.870 -999.990 -999.990 1.200 ..P WKT 2010 12 01 19 44 55 31.3200 -97.3300 251.000 122.0 121.292 3.660 -999.990 -999.990 1.213 ..P WKT 2010 12 01 19 49 55 31.3200 -97.3300 251.000 457.0 119.356 3.710 -999.990 -999.990 1.194 ..P WKT 2010 12 01 19 59 55 31.3200 -97.3300 251.000 30.0 118.994 3.700 -999.990 -999.990 1.190 ..P WKT 2010 12 01 20 04 55 31.3200 -97.3300 251.000 122.0 118.678 3.760 -999.990 -999.990 1.187 ..P WKT 2010 12 01 20 09 55 31.3200 -97.3300 251.000 457.0 121.331 4.000 -999.990 -999.990 1.213 ..P WKT 2010 12 01 20 14 55 31.3200 -97.3300 251.000 30.0 121.825 5.050 -999.990 -999.990 1.218 ..P WKT 2010 12 01 20 19 55 31.3200 -97.3300 251.000 122.0 123.128 4.330 -999.990 -999.990 1.231 ..P WKT 2010 12 01 20 24 55 31.3200 -97.3300 251.000 457.0 124.702 4.030 -999.990 -999.990 1.247 ..P WKT 2010 12 01 20 34 55 31.3200 -97.3300 251.000 30.0 126.114 4.670 -999.990 -999.990 1.261 ..P WKT 2010 12 01 20 39 55 31.3200 -97.3300 251.000 122.0 130.272 4.180 -999.990 -999.990 1.303 ..P WKT 2010 12 01 20 44 55 31.3200 -97.3300 251.000 457.0 132.001 4.320 -999.990 -999.990 1.320 ..P WKT 2010 12 01 20 49 55 31.3200 -97.3300 251.000 30.0 135.890 4.590 -999.990 -999.990 1.359 ..P WKT 2010 12 01 20 54 55 31.3200 -97.3300 251.000 122.0 127.087 3.860 -999.990 -999.990 1.271 ..P WKT 2010 12 01 20 59 55 31.3200 -97.3300 251.000 457.0 130.976 3.940 -999.990 -999.990 1.310 ..P WKT 2010 12 01 21 09 55 31.3200 -97.3300 251.000 30.0 127.702 4.100 -999.990 -999.990 1.277 ..P WKT 2010 12 01 21 14 55 31.3200 -97.3300 251.000 122.0 131.610 4.900 -999.990 -999.990 1.316 ..P WKT 2010 12 01 21 19 55 31.3200 -97.3300 251.000 457.0 132.009 3.940 -999.990 -999.990 1.320 ..P WKT 2010 12 01 21 24 55 31.3200 -97.3300 251.000 30.0 128.085 4.620 -999.990 -999.990 1.281 ..P WKT 2010 12 01 21 29 55 31.3200 -97.3300 251.000 122.0 133.076 4.500 -999.990 -999.990 1.331 ..P WKT 2010 12 01 21 34 55 31.3200 -97.3300 251.000 457.0 129.151 4.510 -999.990 -999.990 1.292 ..P WKT 2010 12 01 21 44 55 31.3200 -97.3300 251.000 30.0 132.147 5.750 -999.990 -999.990 1.321 ..P WKT 2010 12 01 21 49 55 31.3200 -97.3300 251.000 122.0 125.693 4.110 -999.990 -999.990 1.257 ..P WKT 2010 12 01 21 54 55 31.3200 -97.3300 251.000 457.0 126.941 5.760 -999.990 -999.990 1.269 ..P WKT 2010 12 01 21 59 55 31.3200 -97.3300 251.000 30.0 126.161 4.810 -999.990 -999.990 1.262 ..P WKT 2010 12 01 22 04 55 31.3200 -97.3300 251.000 122.0 121.868 5.050 -999.990 -999.990 1.219 ..P WKT 2010 12 01 22 09 55 31.3200 -97.3300 251.000 457.0 122.845 4.520 -999.990 -999.990 1.228 ..P WKT 2010 12 01 22 19 55 31.3200 -97.3300 251.000 30.0 123.930 4.360 -999.990 -999.990 1.239 ..P WKT 2010 12 01 22 24 55 31.3200 -97.3300 251.000 122.0 126.877 4.660 -999.990 -999.990 1.269 ..P WKT 2010 12 01 22 29 55 31.3200 -97.3300 251.000 457.0 128.742 4.830 -999.990 -999.990 1.287 ..P WKT 2010 12 01 22 34 55 31.3200 -97.3300 251.000 30.0 132.770 5.280 -999.990 -999.990 1.328 ..P WKT 2010 12 01 22 39 55 31.3200 -97.3300 251.000 122.0 132.474 5.610 -999.990 -999.990 1.325 ..P WKT 2010 12 01 22 44 55 31.3200 -97.3300 251.000 457.0 137.720 4.570 -999.990 -999.990 1.377 ..P WKT 2010 12 01 22 54 55 31.3200 -97.3300 251.000 30.0 135.350 4.850 -999.990 -999.990 1.353 ..P WKT 2010 12 01 22 59 55 31.3200 -97.3300 251.000 122.0 138.550 4.870 -999.990 -999.990 1.386 ..P WKT 2010 12 01 23 04 55 31.3200 -97.3300 251.000 457.0 136.205 4.710 -999.990 -999.990 1.362 ..P WKT 2010 12 01 23 09 55 31.3200 -97.3300 251.000 30.0 136.971 5.260 -999.990 -999.990 1.370 ..P WKT 2010 12 01 23 14 55 31.3200 -97.3300 251.000 122.0 137.331 4.830 -999.990 -999.990 1.373 ..P WKT 2010 12 01 23 19 55 31.3200 -97.3300 251.000 457.0 138.503 5.210 -999.990 -999.990 1.385 ..P WKT 2010 12 01 23 29 55 31.3200 -97.3300 251.000 30.0 137.876 5.440 -999.990 -999.990 1.379 ..P WKT 2010 12 01 23 34 55 31.3200 -97.3300 251.000 122.0 150.550 4.520 -999.990 -999.990 1.506 ..P WKT 2010 12 01 23 39 55 31.3200 -97.3300 251.000 457.0 148.617 4.540 -999.990 -999.990 1.486 ..P WKT 2010 12 01 23 44 55 31.3200 -97.3300 251.000 30.0 159.399 4.780 -999.990 -999.990 1.594 ..P WKT 2010 12 01 23 49 55 31.3200 -97.3300 251.000 122.0 171.806 4.710 -999.990 -999.990 1.718 ..P WKT 2010 12 02 00 09 55 31.3200 -97.3300 251.000 457.0 170.045 5.040 -999.990 -999.990 1.700 ..P WKT 2010 12 02 00 10 25 31.3200 -97.3300 251.000 457.0 165.928 4.440 -999.990 -999.990 1.659 ..P WKT 2010 12 02 00 10 55 31.3200 -97.3300 251.000 457.0 166.142 4.620 -999.990 -999.990 1.661 ..P WKT 2010 12 02 00 11 25 31.3200 -97.3300 251.000 457.0 166.356 4.650 -999.990 -999.990 1.664 ..P WKT 2010 12 02 00 11 55 31.3200 -97.3300 251.000 457.0 171.170 4.390 -999.990 -999.990 1.712 ..P WKT 2010 12 02 00 12 25 31.3200 -97.3300 251.000 457.0 172.195 4.450 -999.990 -999.990 1.722 ..P WKT 2010 12 02 00 12 55 31.3200 -97.3300 251.000 457.0 172.679 4.680 -999.990 -999.990 1.727 ..P WKT 2010 12 02 00 13 25 31.3200 -97.3300 251.000 457.0 171.269 4.780 -999.990 -999.990 1.713 ..P WKT 2010 12 02 00 13 55 31.3200 -97.3300 251.000 457.0 175.271 4.620 -999.990 -999.990 1.753 ..P WKT 2010 12 02 00 14 25 31.3200 -97.3300 251.000 457.0 176.026 4.700 -999.990 -999.990 1.760 ..P WKT 2010 12 02 00 14 55 31.3200 -97.3300 251.000 457.0 176.511 5.000 -999.990 -999.990 1.765 ..P WKT 2010 12 02 00 19 55 31.3200 -97.3300 251.000 30.0 169.984 5.250 -999.990 -999.990 1.700 ..P WKT 2010 12 02 00 24 55 31.3200 -97.3300 251.000 122.0 150.196 5.210 -999.990 -999.990 1.502 ..P WKT 2010 12 02 00 29 55 31.3200 -97.3300 251.000 457.0 162.887 5.010 -999.990 -999.990 1.629 ..P WKT 2010 12 02 00 34 55 31.3200 -97.3300 251.000 30.0 159.879 4.760 -999.990 -999.990 1.599 ..P WKT 2010 12 02 00 39 55 31.3200 -97.3300 251.000 122.0 144.147 6.550 -999.990 -999.990 1.441 ..P WKT 2010 12 02 00 44 55 31.3200 -97.3300 251.000 457.0 160.629 4.980 -999.990 -999.990 1.606 ..P WKT 2010 12 02 00 54 55 31.3200 -97.3300 251.000 30.0 162.300 4.840 -999.990 -999.990 1.623 ..P WKT 2010 12 02 00 59 55 31.3200 -97.3300 251.000 122.0 129.073 4.640 -999.990 -999.990 1.291 ..P WKT 2010 12 02 01 04 55 31.3200 -97.3300 251.000 457.0 152.976 4.900 -999.990 -999.990 1.530 ..P WKT 2010 12 02 01 09 55 31.3200 -97.3300 251.000 30.0 151.428 5.300 -999.990 -999.990 1.514 ..P WKT 2010 12 02 01 14 55 31.3200 -97.3300 251.000 122.0 130.382 4.410 -999.990 -999.990 1.304 ..P WKT 2010 12 02 01 19 55 31.3200 -97.3300 251.000 457.0 145.893 4.700 -999.990 -999.990 1.459 ..P WKT 2010 12 02 01 29 55 31.3200 -97.3300 251.000 30.0 148.793 4.900 -999.990 -999.990 1.488 ..P WKT 2010 12 02 01 34 55 31.3200 -97.3300 251.000 122.0 134.146 4.980 -999.990 -999.990 1.341 ..P WKT 2010 12 02 01 39 55 31.3200 -97.3300 251.000 457.0 149.700 5.350 -999.990 -999.990 1.497 ..P WKT 2010 12 02 01 44 55 31.3200 -97.3300 251.000 30.0 144.126 4.600 -999.990 -999.990 1.441 ..P WKT 2010 12 02 01 49 55 31.3200 -97.3300 251.000 122.0 131.644 4.830 -999.990 -999.990 1.316 ..P WKT 2010 12 02 01 54 55 31.3200 -97.3300 251.000 457.0 148.149 4.410 -999.990 -999.990 1.481 ..P WKT 2010 12 02 02 04 55 31.3200 -97.3300 251.000 30.0 142.998 4.510 -999.990 -999.990 1.430 ..P WKT 2010 12 02 02 09 55 31.3200 -97.3300 251.000 122.0 128.656 4.630 -999.990 -999.990 1.287 ..P WKT 2010 12 02 02 14 55 31.3200 -97.3300 251.000 457.0 134.363 5.060 -999.990 -999.990 1.344 ..P WKT 2010 12 02 02 19 55 31.3200 -97.3300 251.000 30.0 141.968 4.950 -999.990 -999.990 1.420 ..P WKT 2010 12 02 02 24 55 31.3200 -97.3300 251.000 122.0 133.449 6.010 -999.990 -999.990 1.334 ..P WKT 2010 12 02 02 29 55 31.3200 -97.3300 251.000 457.0 138.480 6.010 -999.990 -999.990 1.385 ..P WKT 2010 12 02 02 39 55 31.3200 -97.3300 251.000 30.0 148.622 5.600 -999.990 -999.990 1.486 ..P WKT 2010 12 02 02 44 55 31.3200 -97.3300 251.000 122.0 130.015 5.170 -999.990 -999.990 1.300 ..P WKT 2010 12 02 02 49 55 31.3200 -97.3300 251.000 457.0 131.194 5.470 -999.990 -999.990 1.312 ..P WKT 2010 12 02 02 54 55 31.3200 -97.3300 251.000 30.0 145.656 5.080 -999.990 -999.990 1.457 ..P WKT 2010 12 02 02 59 55 31.3200 -97.3300 251.000 122.0 120.811 4.840 -999.990 -999.990 1.208 ..P WKT 2010 12 02 03 04 55 31.3200 -97.3300 251.000 457.0 134.732 4.590 -999.990 -999.990 1.347 ..P WKT 2010 12 02 03 14 55 31.3200 -97.3300 251.000 30.0 153.243 4.670 -999.990 -999.990 1.532 ..P WKT 2010 12 02 03 19 55 31.3200 -97.3300 251.000 122.0 126.379 5.820 -999.990 -999.990 1.264 ..P WKT 2010 12 02 03 24 55 31.3200 -97.3300 251.000 457.0 126.222 4.730 -999.990 -999.990 1.262 ..P WKT 2010 12 02 03 29 55 31.3200 -97.3300 251.000 30.0 150.198 5.200 -999.990 -999.990 1.502 ..P WKT 2010 12 02 03 34 55 31.3200 -97.3300 251.000 122.0 123.195 4.610 -999.990 -999.990 1.232 ..P WKT 2010 12 02 03 39 55 31.3200 -97.3300 251.000 457.0 131.716 4.860 -999.990 -999.990 1.317 ..P WKT 2010 12 02 03 49 55 31.3200 -97.3300 251.000 30.0 147.055 4.970 -999.990 -999.990 1.471 ..P WKT 2010 12 02 03 54 55 31.3200 -97.3300 251.000 122.0 146.551 4.860 -999.990 -999.990 1.466 ..P WKT 2010 12 02 03 59 55 31.3200 -97.3300 251.000 457.0 130.042 4.830 -999.990 -999.990 1.300 ..P WKT 2010 12 02 04 04 55 31.3200 -97.3300 251.000 30.0 139.844 4.960 -999.990 -999.990 1.398 ..P WKT 2010 12 02 04 09 55 31.3200 -97.3300 251.000 122.0 125.504 4.850 -999.990 -999.990 1.255 ..P WKT 2010 12 02 04 14 55 31.3200 -97.3300 251.000 457.0 120.657 5.030 -999.990 -999.990 1.207 ..P WKT 2010 12 02 04 24 55 31.3200 -97.3300 251.000 30.0 134.683 4.960 -999.990 -999.990 1.347 ..P WKT 2010 12 02 04 29 55 31.3200 -97.3300 251.000 122.0 123.711 4.960 -999.990 -999.990 1.237 ..P WKT 2010 12 02 04 34 55 31.3200 -97.3300 251.000 457.0 121.422 5.030 -999.990 -999.990 1.214 ..P WKT 2010 12 02 04 39 55 31.3200 -97.3300 251.000 30.0 133.785 5.250 -999.990 -999.990 1.338 ..P WKT 2010 12 02 04 44 55 31.3200 -97.3300 251.000 122.0 130.682 5.410 -999.990 -999.990 1.307 ..P WKT 2010 12 02 04 49 55 31.3200 -97.3300 251.000 457.0 118.894 5.840 -999.990 -999.990 1.189 ..P WKT 2010 12 02 05 04 55 31.3200 -97.3300 251.000 30.0 131.459 6.050 -999.990 -999.990 1.315 ..P WKT 2010 12 02 05 09 55 31.3200 -97.3300 251.000 122.0 127.352 5.310 -999.990 -999.990 1.274 ..P WKT 2010 12 02 05 14 55 31.3200 -97.3300 251.000 457.0 119.172 5.620 -999.990 -999.990 1.192 ..P WKT 2010 12 02 05 19 55 31.3200 -97.3300 251.000 30.0 132.573 5.050 -999.990 -999.990 1.326 ..P WKT 2010 12 02 05 24 55 31.3200 -97.3300 251.000 122.0 133.487 5.070 -999.990 -999.990 1.335 ..P WKT 2010 12 02 05 29 55 31.3200 -97.3300 251.000 457.0 115.262 4.680 -999.990 -999.990 1.153 ..P WKT 2010 12 02 05 39 55 31.3200 -97.3300 251.000 30.0 142.665 4.860 -999.990 -999.990 1.427 ..P WKT 2010 12 02 05 44 55 31.3200 -97.3300 251.000 122.0 139.560 5.990 -999.990 -999.990 1.396 ..P WKT 2010 12 02 05 49 55 31.3200 -97.3300 251.000 457.0 123.964 5.180 -999.990 -999.990 1.240 ..P WKT 2010 12 02 05 54 55 31.3200 -97.3300 251.000 30.0 144.348 5.440 -999.990 -999.990 1.443 ..P WKT 2010 12 02 05 59 55 31.3200 -97.3300 251.000 122.0 136.219 5.300 -999.990 -999.990 1.362 ..P WKT 2010 12 02 06 04 55 31.3200 -97.3300 251.000 457.0 123.880 5.470 -999.990 -999.990 1.239 ..P WKT 2010 12 02 06 14 55 31.3200 -97.3300 251.000 30.0 139.337 5.560 -999.990 -999.990 1.393 ..P WKT 2010 12 02 06 19 55 31.3200 -97.3300 251.000 122.0 137.395 5.770 -999.990 -999.990 1.374 ..P WKT 2010 12 02 06 24 55 31.3200 -97.3300 251.000 457.0 130.021 5.350 -999.990 -999.990 1.300 ..P WKT 2010 12 02 06 29 55 31.3200 -97.3300 251.000 30.0 136.499 5.480 -999.990 -999.990 1.365 ..P WKT 2010 12 02 06 34 55 31.3200 -97.3300 251.000 122.0 137.953 6.100 -999.990 -999.990 1.380 ..P WKT 2010 12 02 06 39 55 31.3200 -97.3300 251.000 457.0 124.328 5.490 -999.990 -999.990 1.243 ..P WKT 2010 12 02 06 49 55 31.3200 -97.3300 251.000 30.0 136.531 5.690 -999.990 -999.990 1.365 ..P WKT 2010 12 02 06 54 55 31.3200 -97.3300 251.000 122.0 145.923 5.390 -999.990 -999.990 1.459 ..P WKT 2010 12 02 06 59 55 31.3200 -97.3300 251.000 457.0 123.523 5.790 -999.990 -999.990 1.235 ..P WKT 2010 12 02 07 04 55 31.3200 -97.3300 251.000 30.0 135.497 5.860 -999.990 -999.990 1.355 ..P WKT 2010 12 02 07 09 55 31.3200 -97.3300 251.000 122.0 143.939 5.680 -999.990 -999.990 1.439 ..P WKT 2010 12 02 07 14 55 31.3200 -97.3300 251.000 457.0 124.253 6.330 -999.990 -999.990 1.243 ..P WKT 2010 12 02 07 24 55 31.3200 -97.3300 251.000 30.0 132.247 6.620 -999.990 -999.990 1.322 ..P WKT 2010 12 02 07 29 55 31.3200 -97.3300 251.000 122.0 143.622 6.630 -999.990 -999.990 1.436 ..P WKT 2010 12 02 07 34 55 31.3200 -97.3300 251.000 457.0 123.467 5.480 -999.990 -999.990 1.235 ..P WKT 2010 12 02 07 39 55 31.3200 -97.3300 251.000 30.0 146.532 5.410 -999.990 -999.990 1.465 ..P WKT 2010 12 02 07 44 55 31.3200 -97.3300 251.000 122.0 144.589 5.900 -999.990 -999.990 1.446 ..P WKT 2010 12 02 07 49 55 31.3200 -97.3300 251.000 457.0 128.237 5.410 -999.990 -999.990 1.282 ..P WKT 2010 12 02 07 59 55 31.3200 -97.3300 251.000 30.0 140.856 5.220 -999.990 -999.990 1.409 ..P WKT 2010 12 02 08 04 55 31.3200 -97.3300 251.000 122.0 145.089 5.470 -999.990 -999.990 1.451 ..P WKT 2010 12 02 08 09 55 31.3200 -97.3300 251.000 457.0 131.103 5.640 -999.990 -999.990 1.311 ..P WKT 2010 12 02 08 14 55 31.3200 -97.3300 251.000 30.0 149.475 5.670 -999.990 -999.990 1.495 ..P WKT 2010 12 02 08 19 55 31.3200 -97.3300 251.000 122.0 138.208 6.060 -999.990 -999.990 1.382 ..P WKT 2010 12 02 08 24 55 31.3200 -97.3300 251.000 457.0 115.518 5.820 -999.990 -999.990 1.155 ..P WKT 2010 12 02 08 34 55 31.3200 -97.3300 251.000 30.0 150.093 6.290 -999.990 -999.990 1.501 ..P WKT 2010 12 02 08 39 55 31.3200 -97.3300 251.000 122.0 135.559 5.880 -999.990 -999.990 1.356 ..P WKT 2010 12 02 08 44 55 31.3200 -97.3300 251.000 457.0 121.024 5.610 -999.990 -999.990 1.210 ..P WKT 2010 12 02 08 49 55 31.3200 -97.3300 251.000 30.0 153.548 5.520 -999.990 -999.990 1.535 ..P WKT 2010 12 02 08 54 55 31.3200 -97.3300 251.000 122.0 135.748 5.760 -999.990 -999.990 1.357 ..P WKT 2010 12 02 08 59 55 31.3200 -97.3300 251.000 457.0 117.675 5.470 -999.990 -999.990 1.177 ..P WKT 2010 12 02 09 09 55 31.3200 -97.3300 251.000 30.0 147.364 5.770 -999.990 -999.990 1.474 ..P WKT 2010 12 02 09 14 55 31.3200 -97.3300 251.000 122.0 131.465 5.590 -999.990 -999.990 1.315 ..P WKT 2010 12 02 09 19 55 31.3200 -97.3300 251.000 457.0 113.388 5.760 -999.990 -999.990 1.134 ..P WKT 2010 12 02 09 24 55 31.3200 -97.3300 251.000 30.0 143.745 6.940 -999.990 -999.990 1.437 ..P WKT 2010 12 02 09 29 55 31.3200 -97.3300 251.000 122.0 129.204 6.720 -999.990 -999.990 1.292 ..P WKT 2010 12 02 09 34 55 31.3200 -97.3300 251.000 457.0 117.248 5.450 -999.990 -999.990 1.172 ..P WKT 2010 12 02 09 44 55 31.3200 -97.3300 251.000 30.0 151.010 5.280 -999.990 -999.990 1.510 ..P WKT 2010 12 02 09 49 55 31.3200 -97.3300 251.000 122.0 127.874 5.650 -999.990 -999.990 1.279 ..P WKT 2010 12 02 09 54 55 31.3200 -97.3300 251.000 457.0 116.984 6.040 -999.990 -999.990 1.170 ..P WKT 2010 12 02 09 59 55 31.3200 -97.3300 251.000 30.0 156.452 5.840 -999.990 -999.990 1.565 ..P WKT 2010 12 02 10 04 55 31.3200 -97.3300 251.000 122.0 125.826 5.790 -999.990 -999.990 1.258 ..P WKT 2010 12 02 10 09 55 31.3200 -97.3300 251.000 457.0 115.615 5.270 -999.990 -999.990 1.156 ..P WKT 2010 12 02 10 19 55 31.3200 -97.3300 251.000 30.0 151.178 5.530 -999.990 -999.990 1.512 ..P WKT 2010 12 02 10 24 55 31.3200 -97.3300 251.000 122.0 128.754 5.740 -999.990 -999.990 1.288 ..P WKT 2010 12 02 10 29 55 31.3200 -97.3300 251.000 457.0 111.500 5.800 -999.990 -999.990 1.115 ..P WKT 2010 12 02 10 34 55 31.3200 -97.3300 251.000 30.0 147.480 5.370 -999.990 -999.990 1.475 ..P WKT 2010 12 02 10 39 55 31.3200 -97.3300 251.000 122.0 131.587 5.550 -999.990 -999.990 1.316 ..P WKT 2010 12 02 10 44 55 31.3200 -97.3300 251.000 457.0 120.050 5.760 -999.990 -999.990 1.200 ..P WKT 2010 12 02 10 54 55 31.3200 -97.3300 251.000 30.0 152.047 5.400 -999.990 -999.990 1.520 ..P WKT 2010 12 02 10 59 55 31.3200 -97.3300 251.000 122.0 124.497 5.810 -999.990 -999.990 1.245 ..P WKT 2010 12 02 11 04 55 31.3200 -97.3300 251.000 457.0 113.016 5.520 -999.990 -999.990 1.130 ..P WKT 2010 12 02 11 09 55 31.3200 -97.3300 251.000 30.0 147.704 5.940 -999.990 -999.990 1.477 ..P WKT 2010 12 02 11 14 55 31.3200 -97.3300 251.000 122.0 132.000 6.100 -999.990 -999.990 1.320 ..P WKT 2010 12 02 11 19 55 31.3200 -97.3300 251.000 457.0 122.289 5.270 -999.990 -999.990 1.223 ..P WKT 2010 12 02 11 29 55 31.3200 -97.3300 251.000 30.0 148.809 5.460 -999.990 -999.990 1.488 ..P WKT 2010 12 02 11 34 55 31.3200 -97.3300 251.000 122.0 125.103 5.420 -999.990 -999.990 1.251 ..P WKT 2010 12 02 11 39 55 31.3200 -97.3300 251.000 457.0 136.273 5.650 -999.990 -999.990 1.363 ..P WKT 2010 12 02 11 44 55 31.3200 -97.3300 251.000 30.0 155.345 5.650 -999.990 -999.990 1.553 ..P WKT 2010 12 02 11 49 55 31.3200 -97.3300 251.000 122.0 128.639 5.710 -999.990 -999.990 1.286 ..P WKT 2010 12 02 12 09 55 31.3200 -97.3300 251.000 457.0 131.014 5.890 -999.990 -999.990 1.310 ..P WKT 2010 12 02 12 10 25 31.3200 -97.3300 251.000 457.0 129.945 5.440 -999.990 -999.990 1.299 ..P WKT 2010 12 02 12 10 55 31.3200 -97.3300 251.000 457.0 131.055 5.580 -999.990 -999.990 1.311 ..P WKT 2010 12 02 12 11 25 31.3200 -97.3300 251.000 457.0 130.258 5.890 -999.990 -999.990 1.303 ..P WKT 2010 12 02 12 11 55 31.3200 -97.3300 251.000 457.0 129.734 6.030 -999.990 -999.990 1.297 ..P WKT 2010 12 02 12 12 25 31.3200 -97.3300 251.000 457.0 136.020 5.420 -999.990 -999.990 1.360 ..P WKT 2010 12 02 12 12 55 31.3200 -97.3300 251.000 457.0 126.777 5.670 -999.990 -999.990 1.268 ..P WKT 2010 12 02 12 13 25 31.3200 -97.3300 251.000 457.0 130.067 5.430 -999.990 -999.990 1.301 ..P WKT 2010 12 02 12 13 55 31.3200 -97.3300 251.000 457.0 126.000 5.660 -999.990 -999.990 1.260 ..P WKT 2010 12 02 12 14 25 31.3200 -97.3300 251.000 457.0 128.201 6.020 -999.990 -999.990 1.282 ..P WKT 2010 12 02 12 14 55 31.3200 -97.3300 251.000 457.0 132.308 7.480 -999.990 -999.990 1.323 ..P WKT 2010 12 02 12 19 55 31.3200 -97.3300 251.000 30.0 146.405 5.630 -999.990 -999.990 1.464 ..P WKT 2010 12 02 12 24 55 31.3200 -97.3300 251.000 122.0 131.624 5.610 -999.990 -999.990 1.316 ..P WKT 2010 12 02 12 29 55 31.3200 -97.3300 251.000 457.0 121.749 5.480 -999.990 -999.990 1.217 ..P WKT 2010 12 02 12 34 55 31.3200 -97.3300 251.000 30.0 151.097 5.750 -999.990 -999.990 1.511 ..P WKT 2010 12 02 12 39 55 31.3200 -97.3300 251.000 122.0 134.141 5.540 -999.990 -999.990 1.341 ..P WKT 2010 12 02 12 44 55 31.3200 -97.3300 251.000 457.0 123.450 5.330 -999.990 -999.990 1.235 ..P WKT 2010 12 02 12 54 55 31.3200 -97.3300 251.000 30.0 150.329 5.980 -999.990 -999.990 1.503 ..P WKT 2010 12 02 12 59 55 31.3200 -97.3300 251.000 122.0 122.821 7.470 -999.990 -999.990 1.228 ..P WKT 2010 12 02 13 04 55 31.3200 -97.3300 251.000 457.0 139.012 5.440 -999.990 -999.990 1.390 ..P WKT 2010 12 02 13 09 55 31.3200 -97.3300 251.000 30.0 149.483 5.460 -999.990 -999.990 1.495 ..P WKT 2010 12 02 13 14 55 31.3200 -97.3300 251.000 122.0 123.070 5.860 -999.990 -999.990 1.231 ..P WKT 2010 12 02 13 19 55 31.3200 -97.3300 251.000 457.0 139.393 6.410 -999.990 -999.990 1.394 ..P WKT 2010 12 02 13 29 55 31.3200 -97.3300 251.000 30.0 151.017 5.450 -999.990 -999.990 1.510 ..P WKT 2010 12 02 13 34 55 31.3200 -97.3300 251.000 122.0 127.140 5.570 -999.990 -999.990 1.271 ..P WKT 2010 12 02 13 39 55 31.3200 -97.3300 251.000 457.0 122.176 5.470 -999.990 -999.990 1.222 ..P WKT 2010 12 02 13 44 55 31.3200 -97.3300 251.000 30.0 162.782 5.560 -999.990 -999.990 1.628 ..P WKT 2010 12 02 13 49 55 31.3200 -97.3300 251.000 122.0 130.340 5.560 -999.990 -999.990 1.303 ..P WKT 2010 12 02 13 54 55 31.3200 -97.3300 251.000 457.0 129.594 5.540 -999.990 -999.990 1.296 ..P WKT 2010 12 02 14 04 55 31.3200 -97.3300 251.000 30.0 153.452 5.910 -999.990 -999.990 1.535 ..P WKT 2010 12 02 14 09 55 31.3200 -97.3300 251.000 122.0 120.400 5.680 -999.990 -999.990 1.204 ..P WKT 2010 12 02 14 14 55 31.3200 -97.3300 251.000 457.0 121.752 6.030 -999.990 -999.990 1.218 ..P WKT 2010 12 02 14 19 55 31.3200 -97.3300 251.000 30.0 156.004 5.690 -999.990 -999.990 1.560 ..P WKT 2010 12 02 14 24 55 31.3200 -97.3300 251.000 122.0 125.542 6.350 -999.990 -999.990 1.255 ..P WKT 2010 12 02 14 29 55 31.3200 -97.3300 251.000 457.0 123.223 5.640 -999.990 -999.990 1.232 ..P WKT 2010 12 02 14 39 55 31.3200 -97.3300 251.000 30.0 166.504 6.160 -999.990 -999.990 1.665 ..P WKT 2010 12 02 14 44 55 31.3200 -97.3300 251.000 122.0 126.481 5.960 -999.990 -999.990 1.265 ..P WKT 2010 12 02 14 49 55 31.3200 -97.3300 251.000 457.0 131.306 5.530 -999.990 -999.990 1.313 ..P WKT 2010 12 02 14 54 55 31.3200 -97.3300 251.000 30.0 162.084 5.810 -999.990 -999.990 1.621 ..P WKT 2010 12 02 14 59 55 31.3200 -97.3300 251.000 122.0 143.129 5.630 -999.990 -999.990 1.431 ..P WKT 2010 12 02 15 04 55 31.3200 -97.3300 251.000 457.0 135.318 5.870 -999.990 -999.990 1.353 ..P WKT 2010 12 02 15 14 55 31.3200 -97.3300 251.000 30.0 160.526 6.060 -999.990 -999.990 1.605 ..P WKT 2010 12 02 15 19 55 31.3200 -97.3300 251.000 122.0 143.285 5.400 -999.990 -999.990 1.433 ..P WKT 2010 12 02 15 24 55 31.3200 -97.3300 251.000 457.0 122.516 5.390 -999.990 -999.990 1.225 ..P WKT 2010 12 02 15 29 55 31.3200 -97.3300 251.000 30.0 151.724 5.510 -999.990 -999.990 1.517 ..P WKT 2010 12 02 15 34 55 31.3200 -97.3300 251.000 122.0 132.859 5.700 -999.990 -999.990 1.329 ..P WKT 2010 12 02 15 39 55 31.3200 -97.3300 251.000 457.0 115.626 5.350 -999.990 -999.990 1.156 ..P WKT 2010 12 02 15 49 55 31.3200 -97.3300 251.000 30.0 136.827 5.740 -999.990 -999.990 1.368 ..P WKT 2010 12 02 15 54 55 31.3200 -97.3300 251.000 122.0 135.073 5.860 -999.990 -999.990 1.351 ..P WKT 2010 12 02 15 59 55 31.3200 -97.3300 251.000 457.0 126.805 5.440 -999.990 -999.990 1.268 ..P WKT 2010 12 02 16 04 55 31.3200 -97.3300 251.000 30.0 131.565 5.700 -999.990 -999.990 1.316 ..P WKT 2010 12 02 16 09 55 31.3200 -97.3300 251.000 122.0 129.541 5.490 -999.990 -999.990 1.295 ..P WKT 2010 12 02 16 14 55 31.3200 -97.3300 251.000 457.0 127.516 5.630 -999.990 -999.990 1.275 ..P WKT 2010 12 02 16 24 55 31.3200 -97.3300 251.000 30.0 133.973 5.670 -999.990 -999.990 1.340 ..P WKT 2010 12 02 16 29 55 31.3200 -97.3300 251.000 122.0 131.600 5.490 -999.990 -999.990 1.316 ..P WKT 2010 12 02 16 34 55 31.3200 -97.3300 251.000 457.0 127.871 6.000 -999.990 -999.990 1.279 ..P WKT 2010 12 02 16 39 55 31.3200 -97.3300 251.000 30.0 136.621 5.770 -999.990 -999.990 1.366 ..P WKT 2010 12 02 16 44 55 31.3200 -97.3300 251.000 122.0 141.572 5.750 -999.990 -999.990 1.416 ..P WKT 2010 12 02 16 49 55 31.3200 -97.3300 251.000 457.0 126.994 5.720 -999.990 -999.990 1.270 ..P WKT 2010 12 02 17 04 55 31.3200 -97.3300 251.000 30.0 134.368 5.990 -999.990 -999.990 1.344 ..P WKT 2010 12 02 17 09 55 31.3200 -97.3300 251.000 122.0 132.800 6.030 -999.990 -999.990 1.328 ..P WKT 2010 12 02 17 14 55 31.3200 -97.3300 251.000 457.0 120.116 5.690 -999.990 -999.990 1.201 ..P WKT 2010 12 02 17 19 55 31.3200 -97.3300 251.000 30.0 135.358 6.050 -999.990 -999.990 1.354 ..P WKT 2010 12 02 17 24 55 31.3200 -97.3300 251.000 122.0 132.706 5.630 -999.990 -999.990 1.327 ..P WKT 2010 12 02 17 29 55 31.3200 -97.3300 251.000 457.0 128.022 5.480 -999.990 -999.990 1.280 ..P WKT 2010 12 02 17 39 55 31.3200 -97.3300 251.000 30.0 135.293 5.640 -999.990 -999.990 1.353 ..P WKT 2010 12 02 17 44 55 31.3200 -97.3300 251.000 122.0 132.478 5.640 -999.990 -999.990 1.325 ..P WKT 2010 12 02 17 49 55 31.3200 -97.3300 251.000 457.0 132.508 7.140 -999.990 -999.990 1.325 ..P WKT 2010 12 02 17 54 55 31.3200 -97.3300 251.000 30.0 138.906 5.410 -999.990 -999.990 1.389 ..P WKT 2010 12 02 17 59 55 31.3200 -97.3300 251.000 122.0 135.278 5.520 -999.990 -999.990 1.353 ..P WKT 2010 12 02 18 04 55 31.3200 -97.3300 251.000 457.0 128.264 5.360 -999.990 -999.990 1.283 ..P WKT 2010 12 02 18 14 55 31.3200 -97.3300 251.000 30.0 129.254 5.210 -999.990 -999.990 1.293 ..P WKT 2010 12 02 18 19 55 31.3200 -97.3300 251.000 122.0 126.421 5.650 -999.990 -999.990 1.264 ..P WKT 2010 12 02 18 24 55 31.3200 -97.3300 251.000 457.0 122.370 5.890 -999.990 -999.990 1.224 ..P WKT 2010 12 02 18 29 55 31.3200 -97.3300 251.000 30.0 128.068 5.180 -999.990 -999.990 1.281 ..P WKT 2010 12 02 18 34 55 31.3200 -97.3300 251.000 122.0 129.568 5.240 -999.990 -999.990 1.296 ..P WKT 2010 12 02 18 39 55 31.3200 -97.3300 251.000 457.0 127.819 5.340 -999.990 -999.990 1.278 ..P WKT 2010 12 02 18 49 55 31.3200 -97.3300 251.000 30.0 130.297 6.170 -999.990 -999.990 1.303 ..P WKT 2010 12 02 18 54 55 31.3200 -97.3300 251.000 122.0 131.140 5.800 -999.990 -999.990 1.311 ..P WKT 2010 12 02 18 59 55 31.3200 -97.3300 251.000 457.0 131.305 5.380 -999.990 -999.990 1.313 ..P WKT 2010 12 02 19 04 55 31.3200 -97.3300 251.000 30.0 129.711 5.660 -999.990 -999.990 1.297 ..P WKT 2010 12 02 19 09 55 31.3200 -97.3300 251.000 122.0 126.494 5.700 -999.990 -999.990 1.265 ..P WKT 2010 12 02 19 14 55 31.3200 -97.3300 251.000 457.0 127.336 6.220 -999.990 -999.990 1.273 ..P WKT 2010 12 02 19 24 55 31.3200 -97.3300 251.000 30.0 131.687 5.520 -999.990 -999.990 1.317 ..P WKT 2010 12 02 19 29 55 31.3200 -97.3300 251.000 122.0 134.384 5.620 -999.990 -999.990 1.344 ..P WKT 2010 12 02 19 34 55 31.3200 -97.3300 251.000 457.0 124.636 5.640 -999.990 -999.990 1.246 ..P WKT 2010 12 02 19 39 55 31.3200 -97.3300 251.000 30.0 131.932 6.110 -999.990 -999.990 1.319 ..P WKT 2010 12 02 19 44 55 31.3200 -97.3300 251.000 122.0 128.948 6.290 -999.990 -999.990 1.289 ..P WKT 2010 12 02 19 49 55 31.3200 -97.3300 251.000 457.0 132.456 5.710 -999.990 -999.990 1.325 ..P WKT 2010 12 02 19 59 55 31.3200 -97.3300 251.000 30.0 130.430 5.660 -999.990 -999.990 1.304 ..P WKT 2010 12 02 20 04 55 31.3200 -97.3300 251.000 122.0 125.169 5.660 -999.990 -999.990 1.252 ..P WKT 2010 12 02 20 09 55 31.3200 -97.3300 251.000 457.0 129.911 6.080 -999.990 -999.990 1.299 ..P WKT 2010 12 02 20 14 55 31.3200 -97.3300 251.000 30.0 122.758 5.660 -999.990 -999.990 1.228 ..P WKT 2010 12 02 20 19 55 31.3200 -97.3300 251.000 122.0 128.581 5.640 -999.990 -999.990 1.286 ..P WKT 2010 12 02 20 24 55 31.3200 -97.3300 251.000 457.0 125.484 5.490 -999.990 -999.990 1.255 ..P WKT 2010 12 02 20 34 55 31.3200 -97.3300 251.000 30.0 122.128 5.520 -999.990 -999.990 1.221 ..P WKT 2010 12 02 20 39 55 31.3200 -97.3300 251.000 122.0 130.787 5.650 -999.990 -999.990 1.308 ..P WKT 2010 12 02 20 44 55 31.3200 -97.3300 251.000 457.0 131.068 6.030 -999.990 -999.990 1.311 ..P WKT 2010 12 02 20 49 55 31.3200 -97.3300 251.000 30.0 135.942 5.970 -999.990 -999.990 1.359 ..P WKT 2010 12 02 20 54 55 31.3200 -97.3300 251.000 122.0 134.602 6.100 -999.990 -999.990 1.346 ..P WKT 2010 12 02 20 59 55 31.3200 -97.3300 251.000 457.0 138.259 6.690 -999.990 -999.990 1.383 ..P WKT 2010 12 02 21 09 55 31.3200 -97.3300 251.000 30.0 132.395 6.450 -999.990 -999.990 1.324 ..P WKT 2010 12 02 21 14 55 31.3200 -97.3300 251.000 122.0 137.055 6.480 -999.990 -999.990 1.371 ..P WKT 2010 12 02 21 19 55 31.3200 -97.3300 251.000 457.0 136.583 6.710 -999.990 -999.990 1.366 ..P WKT 2010 12 02 21 24 55 31.3200 -97.3300 251.000 30.0 144.483 5.640 -999.990 -999.990 1.445 ..P WKT 2010 12 02 21 29 55 31.3200 -97.3300 251.000 122.0 136.045 6.070 -999.990 -999.990 1.360 ..P WKT 2010 12 02 21 34 55 31.3200 -97.3300 251.000 457.0 128.959 5.480 -999.990 -999.990 1.290 ..P WKT 2010 12 02 21 44 55 31.3200 -97.3300 251.000 30.0 144.290 7.000 -999.990 -999.990 1.443 ..P WKT 2010 12 02 21 49 55 31.3200 -97.3300 251.000 122.0 134.448 5.580 -999.990 -999.990 1.344 ..P WKT 2010 12 02 21 54 55 31.3200 -97.3300 251.000 457.0 134.593 5.500 -999.990 -999.990 1.346 ..P WKT 2010 12 02 21 59 55 31.3200 -97.3300 251.000 30.0 130.826 5.270 -999.990 -999.990 1.308 ..P WKT 2010 12 02 22 04 55 31.3200 -97.3300 251.000 122.0 134.884 5.120 -999.990 -999.990 1.349 ..P WKT 2010 12 02 22 09 55 31.3200 -97.3300 251.000 457.0 125.855 5.160 -999.990 -999.990 1.259 ..P WKT 2010 12 02 22 19 55 31.3200 -97.3300 251.000 30.0 133.104 5.180 -999.990 -999.990 1.331 ..P WKT 2010 12 02 22 24 55 31.3200 -97.3300 251.000 122.0 133.057 5.890 -999.990 -999.990 1.331 ..P WKT 2010 12 02 22 29 55 31.3200 -97.3300 251.000 457.0 134.223 5.830 -999.990 -999.990 1.342 ..P WKT 2010 12 02 22 34 55 31.3200 -97.3300 251.000 30.0 134.850 6.340 -999.990 -999.990 1.349 ..P WKT 2010 12 02 22 39 55 31.3200 -97.3300 251.000 122.0 138.309 6.410 -999.990 -999.990 1.383 ..P WKT 2010 12 02 22 44 55 31.3200 -97.3300 251.000 457.0 142.307 6.210 -999.990 -999.990 1.423 ..P WKT 2010 12 02 22 54 55 31.3200 -97.3300 251.000 30.0 144.079 6.370 -999.990 -999.990 1.441 ..P WKT 2010 12 02 22 59 55 31.3200 -97.3300 251.000 122.0 142.529 6.350 -999.990 -999.990 1.425 ..P WKT 2010 12 02 23 04 55 31.3200 -97.3300 251.000 457.0 149.606 6.710 -999.990 -999.990 1.496 ..P WKT 2010 12 02 23 09 55 31.3200 -97.3300 251.000 30.0 145.629 6.460 -999.990 -999.990 1.456 ..P WKT 2010 12 02 23 14 55 31.3200 -97.3300 251.000 122.0 156.209 6.380 -999.990 -999.990 1.562 ..P WKT 2010 12 02 23 19 55 31.3200 -97.3300 251.000 457.0 156.815 5.530 -999.990 -999.990 1.568 ..P WKT 2010 12 02 23 29 55 31.3200 -97.3300 251.000 30.0 150.740 5.410 -999.990 -999.990 1.507 ..P WKT 2010 12 02 23 34 55 31.3200 -97.3300 251.000 122.0 153.761 6.120 -999.990 -999.990 1.538 ..P WKT 2010 12 02 23 39 55 31.3200 -97.3300 251.000 457.0 154.627 6.650 -999.990 -999.990 1.546 ..P WKT 2010 12 02 23 44 55 31.3200 -97.3300 251.000 30.0 149.835 6.650 -999.990 -999.990 1.498 ..P WKT 2010 12 02 23 49 55 31.3200 -97.3300 251.000 122.0 151.239 5.760 -999.990 -999.990 1.512 ..P WKT 2010 12 03 00 09 55 31.3200 -97.3300 251.000 457.0 146.933 5.970 -999.990 -999.990 1.469 ..P WKT 2010 12 03 00 10 25 31.3200 -97.3300 251.000 457.0 141.230 5.500 -999.990 -999.990 1.412 ..P WKT 2010 12 03 00 10 55 31.3200 -97.3300 251.000 457.0 143.610 5.500 -999.990 -999.990 1.436 ..P WKT 2010 12 03 00 11 25 31.3200 -97.3300 251.000 457.0 142.488 5.230 -999.990 -999.990 1.425 ..P WKT 2010 12 03 00 11 55 31.3200 -97.3300 251.000 457.0 142.713 5.380 -999.990 -999.990 1.427 ..P WKT 2010 12 03 00 12 25 31.3200 -97.3300 251.000 457.0 137.010 5.240 -999.990 -999.990 1.370 ..P WKT 2010 12 03 00 12 55 31.3200 -97.3300 251.000 457.0 141.546 5.390 -999.990 -999.990 1.415 ..P WKT 2010 12 03 00 13 25 31.3200 -97.3300 251.000 457.0 136.652 6.340 -999.990 -999.990 1.367 ..P WKT 2010 12 03 00 13 55 31.3200 -97.3300 251.000 457.0 136.607 5.450 -999.990 -999.990 1.366 ..P WKT 2010 12 03 00 14 25 31.3200 -97.3300 251.000 457.0 137.371 5.210 -999.990 -999.990 1.374 ..P WKT 2010 12 03 00 14 55 31.3200 -97.3300 251.000 457.0 139.751 5.460 -999.990 -999.990 1.398 ..P WKT 2010 12 03 00 19 55 31.3200 -97.3300 251.000 30.0 151.434 5.630 -999.990 -999.990 1.514 ..P WKT 2010 12 03 00 24 55 31.3200 -97.3300 251.000 122.0 138.051 5.430 -999.990 -999.990 1.381 ..P WKT 2010 12 03 00 29 55 31.3200 -97.3300 251.000 457.0 150.275 5.720 -999.990 -999.990 1.503 ..P WKT 2010 12 03 00 34 55 31.3200 -97.3300 251.000 30.0 148.753 5.840 -999.990 -999.990 1.488 ..P WKT 2010 12 03 00 39 55 31.3200 -97.3300 251.000 122.0 138.870 5.400 -999.990 -999.990 1.389 ..P WKT 2010 12 03 00 44 55 31.3200 -97.3300 251.000 457.0 139.503 6.010 -999.990 -999.990 1.395 ..P WKT 2010 12 03 00 54 55 31.3200 -97.3300 251.000 30.0 159.793 6.230 -999.990 -999.990 1.598 ..P WKT 2010 12 03 00 59 55 31.3200 -97.3300 251.000 122.0 125.362 5.560 -999.990 -999.990 1.254 ..P WKT 2010 12 03 01 04 55 31.3200 -97.3300 251.000 457.0 127.214 5.540 -999.990 -999.990 1.272 ..P WKT 2010 12 03 01 09 55 31.3200 -97.3300 251.000 30.0 149.441 5.850 -999.990 -999.990 1.494 ..P WKT 2010 12 03 01 14 55 31.3200 -97.3300 251.000 122.0 136.182 5.830 -999.990 -999.990 1.362 ..P WKT 2010 12 03 01 19 55 31.3200 -97.3300 251.000 457.0 133.178 6.170 -999.990 -999.990 1.332 ..P WKT 2010 12 03 01 29 55 31.3200 -97.3300 251.000 30.0 143.579 6.970 -999.990 -999.990 1.436 ..P WKT 2010 12 03 01 34 55 31.3200 -97.3300 251.000 122.0 140.786 6.650 -999.990 -999.990 1.408 ..P WKT 2010 12 03 01 39 55 31.3200 -97.3300 251.000 457.0 143.934 6.070 -999.990 -999.990 1.439 ..P WKT 2010 12 03 01 44 55 31.3200 -97.3300 251.000 30.0 150.324 5.950 -999.990 -999.990 1.503 ..P WKT 2010 12 03 01 49 55 31.3200 -97.3300 251.000 122.0 134.429 6.450 -999.990 -999.990 1.344 ..P WKT 2010 12 03 01 54 55 31.3200 -97.3300 251.000 457.0 148.656 5.890 -999.990 -999.990 1.487 ..P WKT 2010 12 03 02 04 55 31.3200 -97.3300 251.000 30.0 158.550 6.100 -999.990 -999.990 1.586 ..P WKT 2010 12 03 02 09 55 31.3200 -97.3300 251.000 122.0 126.640 6.050 -999.990 -999.990 1.266 ..P WKT 2010 12 03 02 14 55 31.3200 -97.3300 251.000 457.0 151.764 6.330 -999.990 -999.990 1.518 ..P WKT 2010 12 03 02 19 55 31.3200 -97.3300 251.000 30.0 155.806 6.370 -999.990 -999.990 1.558 ..P WKT 2010 12 03 02 24 55 31.3200 -97.3300 251.000 122.0 136.323 6.210 -999.990 -999.990 1.363 ..P WKT 2010 12 03 02 29 55 31.3200 -97.3300 251.000 457.0 150.235 6.230 -999.990 -999.990 1.502 ..P WKT 2010 12 03 02 39 55 31.3200 -97.3300 251.000 30.0 159.655 6.150 -999.990 -999.990 1.597 ..P WKT 2010 12 03 02 44 55 31.3200 -97.3300 251.000 122.0 133.919 6.030 -999.990 -999.990 1.339 ..P WKT 2010 12 03 02 49 55 31.3200 -97.3300 251.000 457.0 145.248 5.880 -999.990 -999.990 1.452 ..P WKT 2010 12 03 02 54 55 31.3200 -97.3300 251.000 30.0 151.709 6.420 -999.990 -999.990 1.517 ..P WKT 2010 12 03 02 59 55 31.3200 -97.3300 251.000 122.0 138.684 6.320 -999.990 -999.990 1.387 ..P WKT 2010 12 03 03 04 55 31.3200 -97.3300 251.000 457.0 139.190 6.560 -999.990 -999.990 1.392 ..P WKT 2010 12 03 03 14 55 31.3200 -97.3300 251.000 30.0 159.157 5.800 -999.990 -999.990 1.592 ..P WKT 2010 12 03 03 19 55 31.3200 -97.3300 251.000 122.0 146.667 5.700 -999.990 -999.990 1.467 ..P WKT 2010 12 03 03 24 55 31.3200 -97.3300 251.000 457.0 130.381 6.470 -999.990 -999.990 1.304 ..P WKT 2010 12 03 03 29 55 31.3200 -97.3300 251.000 30.0 132.783 6.460 -999.990 -999.990 1.328 ..P WKT 2010 12 03 03 34 55 31.3200 -97.3300 251.000 122.0 148.190 6.220 -999.990 -999.990 1.482 ..P WKT 2010 12 03 03 39 55 31.3200 -97.3300 251.000 457.0 123.769 5.770 -999.990 -999.990 1.238 ..P WKT 2010 12 03 03 49 55 31.3200 -97.3300 251.000 30.0 140.267 6.230 -999.990 -999.990 1.403 ..P WKT 2010 12 03 03 54 55 31.3200 -97.3300 251.000 122.0 163.853 6.320 -999.990 -999.990 1.639 ..P WKT 2010 12 03 03 59 55 31.3200 -97.3300 251.000 457.0 124.549 6.460 -999.990 -999.990 1.245 ..P WKT 2010 12 03 04 04 55 31.3200 -97.3300 251.000 30.0 147.327 6.240 -999.990 -999.990 1.473 ..P WKT 2010 12 03 04 09 55 31.3200 -97.3300 251.000 122.0 150.315 6.480 -999.990 -999.990 1.503 ..P WKT 2010 12 03 04 14 55 31.3200 -97.3300 251.000 457.0 123.198 6.310 -999.990 -999.990 1.232 ..P WKT 2010 12 03 04 24 55 31.3200 -97.3300 251.000 30.0 146.996 6.050 -999.990 -999.990 1.470 ..P WKT 2010 12 03 04 29 55 31.3200 -97.3300 251.000 122.0 155.335 6.340 -999.990 -999.990 1.553 ..P WKT 2010 12 03 04 34 55 31.3200 -97.3300 251.000 457.0 130.297 6.530 -999.990 -999.990 1.303 ..P WKT 2010 12 03 04 39 55 31.3200 -97.3300 251.000 30.0 143.793 6.060 -999.990 -999.990 1.438 ..P WKT 2010 12 03 04 44 55 31.3200 -97.3300 251.000 122.0 140.733 6.480 -999.990 -999.990 1.407 ..P WKT 2010 12 03 04 49 55 31.3200 -97.3300 251.000 457.0 131.294 6.410 -999.990 -999.990 1.313 ..P WKT 2010 12 03 05 04 55 31.3200 -97.3300 251.000 30.0 201.903 6.410 -999.990 -999.990 2.019 ..P WKT 2010 12 03 05 09 55 31.3200 -97.3300 251.000 122.0 170.984 6.810 -999.990 -999.990 1.710 ..P WKT 2010 12 03 05 14 55 31.3200 -97.3300 251.000 457.0 137.748 7.270 -999.990 -999.990 1.377 ..P WKT 2010 12 03 05 19 55 31.3200 -97.3300 251.000 30.0 220.516 6.790 -999.990 -999.990 2.205 ..P WKT 2010 12 03 05 24 55 31.3200 -97.3300 251.000 122.0 156.571 6.420 -999.990 -999.990 1.566 ..P WKT 2010 12 03 05 29 55 31.3200 -97.3300 251.000 457.0 142.479 6.250 -999.990 -999.990 1.425 ..P WKT 2010 12 03 05 39 55 31.3200 -97.3300 251.000 30.0 191.278 6.740 -999.990 -999.990 1.913 ..P WKT 2010 12 03 05 44 55 31.3200 -97.3300 251.000 122.0 131.300 7.400 -999.990 -999.990 1.313 ..P WKT 2010 12 03 05 49 55 31.3200 -97.3300 251.000 457.0 144.045 6.640 -999.990 -999.990 1.440 ..P WKT 2010 12 03 05 54 55 31.3200 -97.3300 251.000 30.0 186.298 6.720 -999.990 -999.990 1.863 ..P WKT 2010 12 03 05 59 55 31.3200 -97.3300 251.000 122.0 136.087 6.530 -999.990 -999.990 1.361 ..P WKT 2010 12 03 06 04 55 31.3200 -97.3300 251.000 457.0 127.211 6.490 -999.990 -999.990 1.272 ..P WKT 2010 12 03 06 14 55 31.3200 -97.3300 251.000 30.0 164.025 7.240 -999.990 -999.990 1.640 ..P WKT 2010 12 03 06 19 55 31.3200 -97.3300 251.000 122.0 129.724 6.520 -999.990 -999.990 1.297 ..P WKT 2010 12 03 06 24 55 31.3200 -97.3300 251.000 457.0 123.175 7.210 -999.990 -999.990 1.232 ..P WKT 2010 12 03 06 29 55 31.3200 -97.3300 251.000 30.0 161.402 7.870 -999.990 -999.990 1.614 ..P WKT 2010 12 03 06 34 55 31.3200 -97.3300 251.000 122.0 138.520 7.350 -999.990 -999.990 1.385 ..P WKT 2010 12 03 06 39 55 31.3200 -97.3300 251.000 457.0 124.074 6.730 -999.990 -999.990 1.241 ..P WKT 2010 12 03 06 49 55 31.3200 -97.3300 251.000 30.0 164.093 7.220 -999.990 -999.990 1.641 ..P WKT 2010 12 03 06 54 55 31.3200 -97.3300 251.000 122.0 146.259 7.390 -999.990 -999.990 1.463 ..P WKT 2010 12 03 06 59 55 31.3200 -97.3300 251.000 457.0 131.960 7.790 -999.990 -999.990 1.320 ..P WKT 2010 12 03 07 04 55 31.3200 -97.3300 251.000 30.0 159.618 8.790 -999.990 -999.990 1.596 ..P WKT 2010 12 03 07 09 55 31.3200 -97.3300 251.000 122.0 148.588 8.260 -999.990 -999.990 1.486 ..P WKT 2010 12 03 07 14 55 31.3200 -97.3300 251.000 457.0 133.467 7.050 -999.990 -999.990 1.335 ..P WKT 2010 12 03 07 24 55 31.3200 -97.3300 251.000 30.0 158.182 7.340 -999.990 -999.990 1.582 ..P WKT 2010 12 03 07 29 55 31.3200 -97.3300 251.000 122.0 144.323 8.040 -999.990 -999.990 1.443 ..P WKT 2010 12 03 07 34 55 31.3200 -97.3300 251.000 457.0 137.549 8.450 -999.990 -999.990 1.375 ..P WKT 2010 12 03 07 39 55 31.3200 -97.3300 251.000 30.0 160.500 7.910 -999.990 -999.990 1.605 ..P WKT 2010 12 03 07 44 55 31.3200 -97.3300 251.000 122.0 136.816 7.240 -999.990 -999.990 1.368 ..P WKT 2010 12 03 07 49 55 31.3200 -97.3300 251.000 457.0 129.765 7.780 -999.990 -999.990 1.298 ..P WKT 2010 12 03 07 59 55 31.3200 -97.3300 251.000 30.0 157.017 7.150 -999.990 -999.990 1.570 ..P WKT 2010 12 03 08 04 55 31.3200 -97.3300 251.000 122.0 144.119 7.070 -999.990 -999.990 1.441 ..P WKT 2010 12 03 08 09 55 31.3200 -97.3300 251.000 457.0 133.947 7.540 -999.990 -999.990 1.339 ..P WKT 2010 12 03 08 14 55 31.3200 -97.3300 251.000 30.0 158.439 7.090 -999.990 -999.990 1.584 ..P WKT 2010 12 03 08 19 55 31.3200 -97.3300 251.000 122.0 163.281 7.570 -999.990 -999.990 1.633 ..P WKT 2010 12 03 08 24 55 31.3200 -97.3300 251.000 457.0 120.888 7.480 -999.990 -999.990 1.209 ..P WKT 2010 12 03 08 34 55 31.3200 -97.3300 251.000 30.0 158.756 7.040 -999.990 -999.990 1.588 ..P WKT 2010 12 03 08 39 55 31.3200 -97.3300 251.000 122.0 155.464 7.010 -999.990 -999.990 1.555 ..P WKT 2010 12 03 08 44 55 31.3200 -97.3300 251.000 457.0 132.093 8.290 -999.990 -999.990 1.321 ..P WKT 2010 12 03 08 49 55 31.3200 -97.3300 251.000 30.0 166.503 7.280 -999.990 -999.990 1.665 ..P WKT 2010 12 03 08 54 55 31.3200 -97.3300 251.000 122.0 150.368 7.050 -999.990 -999.990 1.504 ..P WKT 2010 12 03 08 59 55 31.3200 -97.3300 251.000 457.0 132.179 6.980 -999.990 -999.990 1.322 ..P WKT 2010 12 03 09 09 55 31.3200 -97.3300 251.000 30.0 166.747 7.130 -999.990 -999.990 1.667 ..P WKT 2010 12 03 09 14 55 31.3200 -97.3300 251.000 122.0 141.874 7.070 -999.990 -999.990 1.419 ..P WKT 2010 12 03 09 19 55 31.3200 -97.3300 251.000 457.0 124.650 7.030 -999.990 -999.990 1.247 ..P WKT 2010 12 03 09 24 55 31.3200 -97.3300 251.000 30.0 176.204 7.250 -999.990 -999.990 1.762 ..P WKT 2010 12 03 09 29 55 31.3200 -97.3300 251.000 122.0 142.706 7.190 -999.990 -999.990 1.427 ..P WKT 2010 12 03 09 34 55 31.3200 -97.3300 251.000 457.0 121.372 7.300 -999.990 -999.990 1.214 ..P WKT 2010 12 03 09 44 55 31.3200 -97.3300 251.000 30.0 188.844 7.360 -999.990 -999.990 1.888 ..P WKT 2010 12 03 09 49 55 31.3200 -97.3300 251.000 122.0 132.088 7.740 -999.990 -999.990 1.321 ..P WKT 2010 12 03 09 54 55 31.3200 -97.3300 251.000 457.0 121.710 7.590 -999.990 -999.990 1.217 ..P WKT 2010 12 03 09 59 55 31.3200 -97.3300 251.000 30.0 190.576 7.680 -999.990 -999.990 1.906 ..P WKT 2010 12 03 10 04 55 31.3200 -97.3300 251.000 122.0 131.744 8.370 -999.990 -999.990 1.317 ..P WKT 2010 12 03 10 09 55 31.3200 -97.3300 251.000 457.0 127.111 7.760 -999.990 -999.990 1.271 ..P WKT 2010 12 03 10 19 55 31.3200 -97.3300 251.000 30.0 193.767 7.960 -999.990 -999.990 1.938 ..P WKT 2010 12 03 10 24 55 31.3200 -97.3300 251.000 122.0 132.908 7.800 -999.990 -999.990 1.329 ..P WKT 2010 12 03 10 29 55 31.3200 -97.3300 251.000 457.0 119.291 7.920 -999.990 -999.990 1.193 ..P WKT 2010 12 03 10 34 55 31.3200 -97.3300 251.000 30.0 189.651 9.150 -999.990 -999.990 1.897 ..P WKT 2010 12 03 10 39 55 31.3200 -97.3300 251.000 122.0 128.492 8.450 -999.990 -999.990 1.285 ..P WKT 2010 12 03 10 44 55 31.3200 -97.3300 251.000 457.0 124.873 7.430 -999.990 -999.990 1.249 ..P WKT 2010 12 03 10 54 55 31.3200 -97.3300 251.000 30.0 182.956 7.640 -999.990 -999.990 1.830 ..P WKT 2010 12 03 10 59 55 31.3200 -97.3300 251.000 122.0 126.092 8.250 -999.990 -999.990 1.261 ..P WKT 2010 12 03 11 04 55 31.3200 -97.3300 251.000 457.0 121.315 8.960 -999.990 -999.990 1.213 ..P WKT 2010 12 03 11 09 55 31.3200 -97.3300 251.000 30.0 170.839 9.420 -999.990 -999.990 1.708 ..P WKT 2010 12 03 11 14 55 31.3200 -97.3300 251.000 122.0 132.602 8.700 -999.990 -999.990 1.326 ..P WKT 2010 12 03 11 19 55 31.3200 -97.3300 251.000 457.0 136.054 8.080 -999.990 -999.990 1.361 ..P WKT 2010 12 03 11 29 55 31.3200 -97.3300 251.000 30.0 178.201 8.180 -999.990 -999.990 1.782 ..P WKT 2010 12 03 11 34 55 31.3200 -97.3300 251.000 122.0 136.495 8.740 -999.990 -999.990 1.365 ..P WKT 2010 12 03 11 39 55 31.3200 -97.3300 251.000 457.0 128.812 9.230 -999.990 -999.990 1.288 ..P WKT 2010 12 03 11 44 55 31.3200 -97.3300 251.000 30.0 171.089 9.520 -999.990 -999.990 1.711 ..P WKT 2010 12 03 11 49 55 31.3200 -97.3300 251.000 122.0 135.406 8.450 -999.990 -999.990 1.354 ..P WKT 2010 12 03 12 09 55 31.3200 -97.3300 251.000 457.0 125.598 7.660 -999.990 -999.990 1.256 ..P WKT 2010 12 03 12 10 25 31.3200 -97.3300 251.000 457.0 124.007 7.660 -999.990 -999.990 1.240 ..P WKT 2010 12 03 12 10 55 31.3200 -97.3300 251.000 457.0 123.790 7.640 -999.990 -999.990 1.238 ..P WKT 2010 12 03 12 11 25 31.3200 -97.3300 251.000 457.0 126.044 7.530 -999.990 -999.990 1.260 ..P WKT 2010 12 03 12 11 55 31.3200 -97.3300 251.000 457.0 128.024 7.690 -999.990 -999.990 1.280 ..P WKT 2010 12 03 12 12 25 31.3200 -97.3300 251.000 457.0 127.258 7.600 -999.990 -999.990 1.273 ..P WKT 2010 12 03 12 12 55 31.3200 -97.3300 251.000 457.0 124.293 7.590 -999.990 -999.990 1.243 ..P WKT 2010 12 03 12 13 25 31.3200 -97.3300 251.000 457.0 126.548 7.610 -999.990 -999.990 1.265 ..P WKT 2010 12 03 12 13 55 31.3200 -97.3300 251.000 457.0 130.450 7.720 -999.990 -999.990 1.304 ..P WKT 2010 12 03 12 14 25 31.3200 -97.3300 251.000 457.0 123.641 7.700 -999.990 -999.990 1.236 ..P WKT 2010 12 03 12 14 55 31.3200 -97.3300 251.000 457.0 123.149 7.750 -999.990 -999.990 1.231 ..P WKT 2010 12 03 12 19 55 31.3200 -97.3300 251.000 30.0 165.469 8.140 -999.990 -999.990 1.655 ..P WKT 2010 12 03 12 24 55 31.3200 -97.3300 251.000 122.0 131.709 8.240 -999.990 -999.990 1.317 ..P WKT 2010 12 03 12 29 55 31.3200 -97.3300 251.000 457.0 126.239 7.940 -999.990 -999.990 1.262 ..P WKT 2010 12 03 12 34 55 31.3200 -97.3300 251.000 30.0 165.268 8.540 -999.990 -999.990 1.653 ..P WKT 2010 12 03 12 39 55 31.3200 -97.3300 251.000 122.0 135.899 8.180 -999.990 -999.990 1.359 ..P WKT 2010 12 03 12 44 55 31.3200 -97.3300 251.000 457.0 134.961 7.460 -999.990 -999.990 1.350 ..P WKT 2010 12 03 12 54 55 31.3200 -97.3300 251.000 30.0 178.062 7.670 -999.990 -999.990 1.781 ..P WKT 2010 12 03 12 59 55 31.3200 -97.3300 251.000 122.0 143.528 7.810 -999.990 -999.990 1.435 ..P WKT 2010 12 03 13 04 55 31.3200 -97.3300 251.000 457.0 133.582 7.670 -999.990 -999.990 1.336 ..P WKT 2010 12 03 13 09 55 31.3200 -97.3300 251.000 30.0 171.444 7.630 -999.990 -999.990 1.714 ..P WKT 2010 12 03 13 14 55 31.3200 -97.3300 251.000 122.0 141.440 7.650 -999.990 -999.990 1.414 ..P WKT 2010 12 03 13 19 55 31.3200 -97.3300 251.000 457.0 135.615 7.530 -999.990 -999.990 1.356 ..P WKT 2010 12 03 13 29 55 31.3200 -97.3300 251.000 30.0 185.990 7.450 -999.990 -999.990 1.860 ..P WKT 2010 12 03 13 34 55 31.3200 -97.3300 251.000 122.0 144.911 8.080 -999.990 -999.990 1.449 ..P WKT 2010 12 03 13 39 55 31.3200 -97.3300 251.000 457.0 163.190 7.190 -999.990 -999.990 1.632 ..P WKT 2010 12 03 13 44 55 31.3200 -97.3300 251.000 30.0 186.419 7.720 -999.990 -999.990 1.864 ..P WKT 2010 12 03 13 49 55 31.3200 -97.3300 251.000 122.0 142.862 7.180 -999.990 -999.990 1.429 ..P WKT 2010 12 03 13 54 55 31.3200 -97.3300 251.000 457.0 159.632 8.090 -999.990 -999.990 1.596 ..P WKT 2010 12 03 14 04 55 31.3200 -97.3300 251.000 30.0 182.280 7.480 -999.990 -999.990 1.823 ..P WKT 2010 12 03 14 09 55 31.3200 -97.3300 251.000 122.0 146.923 7.250 -999.990 -999.990 1.469 ..P WKT 2010 12 03 14 14 55 31.3200 -97.3300 251.000 457.0 148.674 7.240 -999.990 -999.990 1.487 ..P WKT 2010 12 03 14 19 55 31.3200 -97.3300 251.000 30.0 181.903 7.510 -999.990 -999.990 1.819 ..P WKT 2010 12 03 14 24 55 31.3200 -97.3300 251.000 122.0 150.116 7.900 -999.990 -999.990 1.501 ..P WKT 2010 12 03 14 29 55 31.3200 -97.3300 251.000 457.0 171.388 7.530 -999.990 -999.990 1.714 ..P WKT 2010 12 03 14 39 55 31.3200 -97.3300 251.000 30.0 178.212 8.710 -999.990 -999.990 1.782 ..P WKT 2010 12 03 14 44 55 31.3200 -97.3300 251.000 122.0 152.902 7.580 -999.990 -999.990 1.529 ..P WKT 2010 12 03 14 49 55 31.3200 -97.3300 251.000 457.0 158.661 7.310 -999.990 -999.990 1.587 ..P WKT 2010 12 03 14 54 55 31.3200 -97.3300 251.000 30.0 199.068 7.460 -999.990 -999.990 1.991 ..P WKT 2010 12 03 14 59 55 31.3200 -97.3300 251.000 122.0 149.556 7.330 -999.990 -999.990 1.496 ..P WKT 2010 12 03 15 04 55 31.3200 -97.3300 251.000 457.0 150.916 7.860 -999.990 -999.990 1.509 ..P WKT 2010 12 03 15 14 55 31.3200 -97.3300 251.000 30.0 199.682 7.920 -999.990 -999.990 1.997 ..P WKT 2010 12 03 15 19 55 31.3200 -97.3300 251.000 122.0 156.331 7.830 -999.990 -999.990 1.563 ..P WKT 2010 12 03 15 24 55 31.3200 -97.3300 251.000 457.0 144.332 7.270 -999.990 -999.990 1.443 ..P WKT 2010 12 03 15 29 55 31.3200 -97.3300 251.000 30.0 175.240 8.570 -999.990 -999.990 1.752 ..P WKT 2010 12 03 15 34 55 31.3200 -97.3300 251.000 122.0 153.614 7.670 -999.990 -999.990 1.536 ..P WKT 2010 12 03 15 39 55 31.3200 -97.3300 251.000 457.0 140.513 6.750 -999.990 -999.990 1.405 ..P WKT 2010 12 03 15 49 55 31.3200 -97.3300 251.000 30.0 155.651 6.800 -999.990 -999.990 1.557 ..P WKT 2010 12 03 15 54 55 31.3200 -97.3300 251.000 122.0 150.605 7.520 -999.990 -999.990 1.506 ..P WKT 2010 12 03 15 59 55 31.3200 -97.3300 251.000 457.0 147.760 7.780 -999.990 -999.990 1.478 ..P WKT 2010 12 03 16 04 55 31.3200 -97.3300 251.000 30.0 150.967 7.020 -999.990 -999.990 1.510 ..P WKT 2010 12 03 16 09 55 31.3200 -97.3300 251.000 122.0 148.948 6.830 -999.990 -999.990 1.489 ..P WKT 2010 12 03 16 14 55 31.3200 -97.3300 251.000 457.0 149.679 7.010 -999.990 -999.990 1.497 ..P WKT 2010 12 03 16 24 55 31.3200 -97.3300 251.000 30.0 158.454 6.780 -999.990 -999.990 1.585 ..P WKT 2010 12 03 16 29 55 31.3200 -97.3300 251.000 122.0 153.564 7.270 -999.990 -999.990 1.536 ..P WKT 2010 12 03 16 34 55 31.3200 -97.3300 251.000 457.0 149.499 7.350 -999.990 -999.990 1.495 ..P WKT 2010 12 03 16 39 55 31.3200 -97.3300 251.000 30.0 164.836 7.270 -999.990 -999.990 1.648 ..P WKT 2010 12 03 16 44 55 31.3200 -97.3300 251.000 122.0 166.276 7.400 -999.990 -999.990 1.663 ..P WKT 2010 12 03 16 49 55 31.3200 -97.3300 251.000 457.0 150.652 6.830 -999.990 -999.990 1.507 ..P WKT 2010 12 03 17 04 55 31.3200 -97.3300 251.000 30.0 169.308 6.540 -999.990 -999.990 1.693 ..P WKT 2010 12 03 17 09 55 31.3200 -97.3300 251.000 122.0 167.251 6.620 -999.990 -999.990 1.673 ..P WKT 2010 12 03 17 14 55 31.3200 -97.3300 251.000 457.0 154.734 6.600 -999.990 -999.990 1.547 ..P WKT 2010 12 03 17 19 55 31.3200 -97.3300 251.000 30.0 166.439 7.020 -999.990 -999.990 1.664 ..P WKT 2010 12 03 17 24 55 31.3200 -97.3300 251.000 122.0 165.897 8.220 -999.990 -999.990 1.659 ..P WKT 2010 12 03 17 29 55 31.3200 -97.3300 251.000 457.0 161.774 7.660 -999.990 -999.990 1.618 ..P WKT 2010 12 03 17 39 55 31.3200 -97.3300 251.000 30.0 166.113 6.780 -999.990 -999.990 1.661 ..P WKT 2010 12 03 17 44 55 31.3200 -97.3300 251.000 122.0 171.683 6.480 -999.990 -999.990 1.717 ..P WKT 2010 12 03 17 49 55 31.3200 -97.3300 251.000 457.0 161.835 6.540 -999.990 -999.990 1.618 ..P WKT 2010 12 03 17 54 55 31.3200 -97.3300 251.000 30.0 158.870 6.360 -999.990 -999.990 1.589 ..P WKT 2010 12 03 17 59 55 31.3200 -97.3300 251.000 122.0 164.716 6.930 -999.990 -999.990 1.647 ..P WKT 2010 12 03 18 04 55 31.3200 -97.3300 251.000 457.0 148.946 7.200 -999.990 -999.990 1.489 ..P WKT 2010 12 03 18 14 55 31.3200 -97.3300 251.000 30.0 144.725 6.490 -999.990 -999.990 1.447 ..P WKT 2010 12 03 18 19 55 31.3200 -97.3300 251.000 122.0 155.863 6.120 -999.990 -999.990 1.559 ..P WKT 2010 12 03 18 24 55 31.3200 -97.3300 251.000 457.0 147.723 6.020 -999.990 -999.990 1.477 ..P WKT 2010 12 03 18 29 55 31.3200 -97.3300 251.000 30.0 142.200 6.830 -999.990 -999.990 1.422 ..P WKT 2010 12 03 18 34 55 31.3200 -97.3300 251.000 122.0 146.729 5.870 -999.990 -999.990 1.467 ..P WKT 2010 12 03 18 39 55 31.3200 -97.3300 251.000 457.0 145.749 6.010 -999.990 -999.990 1.457 ..P WKT 2010 12 03 18 49 55 31.3200 -97.3300 251.000 30.0 144.557 5.840 -999.990 -999.990 1.446 ..P WKT 2010 12 03 18 54 55 31.3200 -97.3300 251.000 122.0 148.201 6.430 -999.990 -999.990 1.482 ..P WKT 2010 12 03 18 59 55 31.3200 -97.3300 251.000 457.0 144.683 6.170 -999.990 -999.990 1.447 ..P WKT 2010 12 03 19 04 55 31.3200 -97.3300 251.000 30.0 139.512 5.830 -999.990 -999.990 1.395 ..P WKT 2010 12 03 19 09 55 31.3200 -97.3300 251.000 122.0 142.330 5.960 -999.990 -999.990 1.423 ..P WKT 2010 12 03 19 14 55 31.3200 -97.3300 251.000 457.0 146.250 6.290 -999.990 -999.990 1.463 ..P WKT 2010 12 03 19 24 55 31.3200 -97.3300 251.000 30.0 139.489 6.300 -999.990 -999.990 1.395 ..P WKT 2010 12 03 19 29 55 31.3200 -97.3300 251.000 122.0 145.613 6.250 -999.990 -999.990 1.456 ..P WKT 2010 12 03 19 34 55 31.3200 -97.3300 251.000 457.0 152.014 6.070 -999.990 -999.990 1.520 ..P WKT 2010 12 03 19 39 55 31.3200 -97.3300 251.000 30.0 141.606 7.500 -999.990 -999.990 1.416 ..P WKT 2010 12 03 19 44 55 31.3200 -97.3300 251.000 122.0 140.567 5.850 -999.990 -999.990 1.406 ..P WKT 2010 12 03 19 49 55 31.3200 -97.3300 251.000 457.0 143.661 5.880 -999.990 -999.990 1.437 ..P WKT 2010 12 03 19 59 55 31.3200 -97.3300 251.000 30.0 146.563 5.710 -999.990 -999.990 1.466 ..P WKT 2010 12 03 20 04 55 31.3200 -97.3300 251.000 122.0 152.433 6.180 -999.990 -999.990 1.524 ..P WKT 2010 12 03 20 09 55 31.3200 -97.3300 251.000 457.0 153.068 5.820 -999.990 -999.990 1.531 ..P WKT 2010 12 03 20 14 55 31.3200 -97.3300 251.000 30.0 151.773 5.950 -999.990 -999.990 1.518 ..P WKT 2010 12 03 20 19 55 31.3200 -97.3300 251.000 122.0 153.510 5.990 -999.990 -999.990 1.535 ..P WKT 2010 12 03 20 24 55 31.3200 -97.3300 251.000 457.0 152.353 5.900 -999.990 -999.990 1.524 ..P WKT 2010 12 03 20 34 55 31.3200 -97.3300 251.000 30.0 149.112 6.050 -999.990 -999.990 1.491 ..P WKT 2010 12 03 20 39 55 31.3200 -97.3300 251.000 122.0 150.475 6.060 -999.990 -999.990 1.505 ..P WKT 2010 12 03 20 44 55 31.3200 -97.3300 251.000 457.0 148.392 5.850 -999.990 -999.990 1.484 ..P WKT 2010 12 03 20 49 55 31.3200 -97.3300 251.000 30.0 152.374 6.820 -999.990 -999.990 1.524 ..P WKT 2010 12 03 20 54 55 31.3200 -97.3300 251.000 122.0 154.702 6.100 -999.990 -999.990 1.547 ..P WKT 2010 12 03 20 59 55 31.3200 -97.3300 251.000 457.0 151.654 6.040 -999.990 -999.990 1.517 ..P WKT 2010 12 03 21 09 55 31.3200 -97.3300 251.000 30.0 150.462 7.410 -999.990 -999.990 1.505 ..P WKT 2010 12 03 21 14 55 31.3200 -97.3300 251.000 122.0 162.244 5.870 -999.990 -999.990 1.622 ..P WKT 2010 12 03 21 19 55 31.3200 -97.3300 251.000 457.0 154.724 6.090 -999.990 -999.990 1.547 ..P WKT 2010 12 03 21 24 55 31.3200 -97.3300 251.000 30.0 158.373 6.070 -999.990 -999.990 1.584 ..P WKT 2010 12 03 21 29 55 31.3200 -97.3300 251.000 122.0 164.917 5.860 -999.990 -999.990 1.649 ..P WKT 2010 12 03 21 34 55 31.3200 -97.3300 251.000 457.0 162.223 5.520 -999.990 -999.990 1.622 ..P WKT 2010 12 03 21 44 55 31.3200 -97.3300 251.000 30.0 163.316 5.370 -999.990 -999.990 1.633 ..P WKT 2010 12 03 21 49 55 31.3200 -97.3300 251.000 122.0 168.758 5.500 -999.990 -999.990 1.688 ..P WKT 2010 12 03 21 54 55 31.3200 -97.3300 251.000 457.0 164.133 6.490 -999.990 -999.990 1.641 ..P WKT 2010 12 03 21 59 55 31.3200 -97.3300 251.000 30.0 165.300 5.400 -999.990 -999.990 1.653 ..P WKT 2010 12 03 22 04 55 31.3200 -97.3300 251.000 122.0 155.572 5.250 -999.990 -999.990 1.556 ..P WKT 2010 12 03 22 09 55 31.3200 -97.3300 251.000 457.0 157.429 5.600 -999.990 -999.990 1.574 ..P WKT 2010 12 03 22 19 55 31.3200 -97.3300 251.000 30.0 153.162 5.430 -999.990 -999.990 1.532 ..P WKT 2010 12 03 22 24 55 31.3200 -97.3300 251.000 122.0 156.831 5.470 -999.990 -999.990 1.568 ..P WKT 2010 12 03 22 29 55 31.3200 -97.3300 251.000 457.0 150.845 5.500 -999.990 -999.990 1.508 ..P WKT 2010 12 03 22 34 55 31.3200 -97.3300 251.000 30.0 146.790 6.330 -999.990 -999.990 1.468 ..P WKT 2010 12 03 22 39 55 31.3200 -97.3300 251.000 122.0 146.045 6.120 -999.990 -999.990 1.460 ..P WKT 2010 12 03 22 44 55 31.3200 -97.3300 251.000 457.0 155.233 5.450 -999.990 -999.990 1.552 ..P WKT 2010 12 03 22 54 55 31.3200 -97.3300 251.000 30.0 152.345 6.120 -999.990 -999.990 1.523 ..P WKT 2010 12 03 22 59 55 31.3200 -97.3300 251.000 122.0 154.616 5.510 -999.990 -999.990 1.546 ..P WKT 2010 12 03 23 04 55 31.3200 -97.3300 251.000 457.0 154.128 5.760 -999.990 -999.990 1.541 ..P WKT 2010 12 03 23 09 55 31.3200 -97.3300 251.000 30.0 150.328 6.750 -999.990 -999.990 1.503 ..P WKT 2010 12 03 23 14 55 31.3200 -97.3300 251.000 122.0 156.462 7.230 -999.990 -999.990 1.565 ..P WKT 2010 12 03 23 19 55 31.3200 -97.3300 251.000 457.0 154.870 6.710 -999.990 -999.990 1.549 ..P WKT 2010 12 03 23 29 55 31.3200 -97.3300 251.000 30.0 161.271 5.030 -999.990 -999.990 1.613 ..P WKT 2010 12 03 23 34 55 31.3200 -97.3300 251.000 122.0 162.641 5.750 -999.990 -999.990 1.626 ..P WKT 2010 12 03 23 39 55 31.3200 -97.3300 251.000 457.0 160.423 6.910 -999.990 -999.990 1.604 ..P WKT 2010 12 03 23 44 55 31.3200 -97.3300 251.000 30.0 159.585 6.160 -999.990 -999.990 1.596 ..P WKT 2010 12 03 23 49 55 31.3200 -97.3300 251.000 122.0 163.991 5.840 -999.990 -999.990 1.640 ..P WKT 2010 12 04 00 09 55 31.3200 -97.3300 251.000 457.0 151.492 5.660 -999.990 -999.990 1.515 ..P WKT 2010 12 04 00 10 25 31.3200 -97.3300 251.000 457.0 152.597 5.440 -999.990 -999.990 1.526 ..P WKT 2010 12 04 00 10 55 31.3200 -97.3300 251.000 457.0 149.837 5.460 -999.990 -999.990 1.498 ..P WKT 2010 12 04 00 11 25 31.3200 -97.3300 251.000 457.0 153.701 5.450 -999.990 -999.990 1.537 ..P WKT 2010 12 04 00 11 55 31.3200 -97.3300 251.000 457.0 152.874 5.760 -999.990 -999.990 1.529 ..P WKT 2010 12 04 00 12 25 31.3200 -97.3300 251.000 457.0 155.633 5.440 -999.990 -999.990 1.556 ..P WKT 2010 12 04 00 12 55 31.3200 -97.3300 251.000 457.0 150.666 5.620 -999.990 -999.990 1.507 ..P WKT 2010 12 04 00 13 25 31.3200 -97.3300 251.000 457.0 160.049 5.390 -999.990 -999.990 1.600 ..P WKT 2010 12 04 00 13 55 31.3200 -97.3300 251.000 457.0 147.908 5.850 -999.990 -999.990 1.479 ..P WKT 2010 12 04 00 14 25 31.3200 -97.3300 251.000 457.0 145.149 5.730 -999.990 -999.990 1.451 ..P WKT 2010 12 04 00 14 55 31.3200 -97.3300 251.000 457.0 148.323 6.320 -999.990 -999.990 1.483 ..P WKT 2010 12 04 00 19 55 31.3200 -97.3300 251.000 30.0 156.189 6.180 -999.990 -999.990 1.562 ..P WKT 2010 12 04 00 24 55 31.3200 -97.3300 251.000 122.0 157.433 5.250 -999.990 -999.990 1.574 ..P WKT 2010 12 04 00 29 55 31.3200 -97.3300 251.000 457.0 158.263 5.200 -999.990 -999.990 1.583 ..P WKT 2010 12 04 00 34 55 31.3200 -97.3300 251.000 30.0 158.540 5.380 -999.990 -999.990 1.585 ..P WKT 2010 12 04 00 39 55 31.3200 -97.3300 251.000 122.0 153.580 5.430 -999.990 -999.990 1.536 ..P WKT 2010 12 04 00 44 55 31.3200 -97.3300 251.000 457.0 164.610 6.160 -999.990 -999.990 1.646 ..P WKT 2010 12 04 00 54 55 31.3200 -97.3300 251.000 30.0 161.191 4.950 -999.990 -999.990 1.612 ..P WKT 2010 12 04 00 59 55 31.3200 -97.3300 251.000 122.0 161.768 4.970 -999.990 -999.990 1.618 ..P WKT 2010 12 04 01 04 55 31.3200 -97.3300 251.000 457.0 171.574 5.380 -999.990 -999.990 1.716 ..P WKT 2010 12 04 01 09 55 31.3200 -97.3300 251.000 30.0 157.825 4.830 -999.990 -999.990 1.578 ..P WKT 2010 12 04 01 14 55 31.3200 -97.3300 251.000 122.0 167.628 4.880 -999.990 -999.990 1.676 ..P WKT 2010 12 04 01 19 55 31.3200 -97.3300 251.000 457.0 162.559 4.810 -999.990 -999.990 1.626 ..P WKT 2010 12 04 01 29 55 31.3200 -97.3300 251.000 30.0 166.149 5.250 -999.990 -999.990 1.661 ..P WKT 2010 12 04 01 34 55 31.3200 -97.3300 251.000 122.0 185.264 5.140 -999.990 -999.990 1.853 ..P WKT 2010 12 04 01 39 55 31.3200 -97.3300 251.000 457.0 147.958 5.090 -999.990 -999.990 1.480 ..P WKT 2010 12 04 01 44 55 31.3200 -97.3300 251.000 30.0 167.206 5.440 -999.990 -999.990 1.672 ..P WKT 2010 12 04 01 49 55 31.3200 -97.3300 251.000 122.0 186.312 5.880 -999.990 -999.990 1.863 ..P WKT 2010 12 04 01 54 55 31.3200 -97.3300 251.000 457.0 141.321 5.880 -999.990 -999.990 1.413 ..P WKT 2010 12 04 02 04 55 31.3200 -97.3300 251.000 30.0 171.921 5.650 -999.990 -999.990 1.719 ..P WKT 2010 12 04 02 09 55 31.3200 -97.3300 251.000 122.0 169.255 5.630 -999.990 -999.990 1.693 ..P WKT 2010 12 04 02 14 55 31.3200 -97.3300 251.000 457.0 138.687 5.030 -999.990 -999.990 1.387 ..P WKT 2010 12 04 02 19 55 31.3200 -97.3300 251.000 30.0 176.705 4.820 -999.990 -999.990 1.767 ..P WKT 2010 12 04 02 24 55 31.3200 -97.3300 251.000 122.0 203.169 6.800 -999.990 -999.990 2.032 ..P WKT 2010 12 04 02 29 55 31.3200 -97.3300 251.000 457.0 139.226 4.990 -999.990 -999.990 1.392 ..P WKT 2010 12 04 02 39 55 31.3200 -97.3300 251.000 30.0 185.451 5.160 -999.990 -999.990 1.855 ..P WKT 2010 12 04 02 44 55 31.3200 -97.3300 251.000 122.0 213.446 5.290 -999.990 -999.990 2.134 ..P WKT 2010 12 04 02 49 55 31.3200 -97.3300 251.000 457.0 142.305 5.490 -999.990 -999.990 1.423 ..P WKT 2010 12 04 02 54 55 31.3200 -97.3300 251.000 30.0 187.869 6.800 -999.990 -999.990 1.879 ..P WKT 2010 12 04 02 59 55 31.3200 -97.3300 251.000 122.0 213.655 5.900 -999.990 -999.990 2.137 ..P WKT 2010 12 04 03 04 55 31.3200 -97.3300 251.000 457.0 140.900 4.920 -999.990 -999.990 1.409 ..P WKT 2010 12 04 03 14 55 31.3200 -97.3300 251.000 30.0 200.342 5.100 -999.990 -999.990 2.003 ..P WKT 2010 12 04 03 19 55 31.3200 -97.3300 251.000 122.0 191.191 5.860 -999.990 -999.990 1.912 ..P WKT 2010 12 04 03 24 55 31.3200 -97.3300 251.000 457.0 138.978 6.400 -999.990 -999.990 1.390 ..P WKT 2010 12 04 03 29 55 31.3200 -97.3300 251.000 30.0 179.204 7.340 -999.990 -999.990 1.792 ..P WKT 2010 12 04 03 34 55 31.3200 -97.3300 251.000 122.0 159.092 6.460 -999.990 -999.990 1.591 ..P WKT 2010 12 04 03 39 55 31.3200 -97.3300 251.000 457.0 126.101 5.740 -999.990 -999.990 1.261 ..P WKT 2010 12 04 03 49 55 31.3200 -97.3300 251.000 30.0 147.385 5.350 -999.990 -999.990 1.474 ..P WKT 2010 12 04 03 54 55 31.3200 -97.3300 251.000 122.0 142.166 6.430 -999.990 -999.990 1.422 ..P WKT 2010 12 04 03 59 55 31.3200 -97.3300 251.000 457.0 124.895 6.900 -999.990 -999.990 1.249 ..P WKT 2010 12 04 04 04 55 31.3200 -97.3300 251.000 30.0 144.611 6.210 -999.990 -999.990 1.446 ..P WKT 2010 12 04 04 09 55 31.3200 -97.3300 251.000 122.0 138.301 5.250 -999.990 -999.990 1.383 ..P WKT 2010 12 04 04 14 55 31.3200 -97.3300 251.000 457.0 130.074 5.130 -999.990 -999.990 1.301 ..P WKT 2010 12 04 04 24 55 31.3200 -97.3300 251.000 30.0 141.341 4.550 -999.990 -999.990 1.413 ..P WKT 2010 12 04 04 29 55 31.3200 -97.3300 251.000 122.0 137.557 5.990 -999.990 -999.990 1.376 ..P WKT 2010 12 04 04 34 55 31.3200 -97.3300 251.000 457.0 132.679 6.000 -999.990 -999.990 1.327 ..P WKT 2010 12 04 04 39 55 31.3200 -97.3300 251.000 30.0 133.960 5.290 -999.990 -999.990 1.340 ..P WKT 2010 12 04 04 44 55 31.3200 -97.3300 251.000 122.0 130.999 4.210 -999.990 -999.990 1.310 ..P WKT 2010 12 04 04 49 55 31.3200 -97.3300 251.000 457.0 125.305 4.280 -999.990 -999.990 1.253 ..P WKT 2010 12 04 05 04 55 31.3200 -97.3300 251.000 30.0 129.885 4.500 -999.990 -999.990 1.299 ..P WKT 2010 12 04 05 09 55 31.3200 -97.3300 251.000 122.0 130.030 4.420 -999.990 -999.990 1.300 ..P WKT 2010 12 04 05 14 55 31.3200 -97.3300 251.000 457.0 129.082 7.830 -999.990 -999.990 1.291 ..P WKT 2010 12 04 05 19 55 31.3200 -97.3300 251.000 30.0 136.606 4.530 -999.990 -999.990 1.366 ..P WKT 2010 12 04 05 24 55 31.3200 -97.3300 251.000 122.0 137.297 5.160 -999.990 -999.990 1.373 ..P WKT 2010 12 04 05 29 55 31.3200 -97.3300 251.000 457.0 126.511 4.880 -999.990 -999.990 1.265 ..P WKT 2010 12 04 05 39 55 31.3200 -97.3300 251.000 30.0 137.555 4.650 -999.990 -999.990 1.376 ..P WKT 2010 12 04 05 44 55 31.3200 -97.3300 251.000 122.0 141.895 4.900 -999.990 -999.990 1.419 ..P WKT 2010 12 04 05 49 55 31.3200 -97.3300 251.000 457.0 131.899 5.010 -999.990 -999.990 1.319 ..P WKT 2010 12 04 05 54 55 31.3200 -97.3300 251.000 30.0 139.925 4.980 -999.990 -999.990 1.399 ..P WKT 2010 12 04 05 59 55 31.3200 -97.3300 251.000 122.0 138.804 4.500 -999.990 -999.990 1.388 ..P WKT 2010 12 04 06 04 55 31.3200 -97.3300 251.000 457.0 146.553 4.580 -999.990 -999.990 1.466 ..P WKT 2010 12 04 06 14 55 31.3200 -97.3300 251.000 30.0 138.013 4.470 -999.990 -999.990 1.380 ..P WKT 2010 12 04 06 19 55 31.3200 -97.3300 251.000 122.0 143.830 5.730 -999.990 -999.990 1.438 ..P WKT 2010 12 04 06 24 55 31.3200 -97.3300 251.000 457.0 130.278 5.210 -999.990 -999.990 1.303 ..P WKT 2010 12 04 06 29 55 31.3200 -97.3300 251.000 30.0 142.366 4.810 -999.990 -999.990 1.424 ..P WKT 2010 12 04 06 34 55 31.3200 -97.3300 251.000 122.0 143.271 5.260 -999.990 -999.990 1.433 ..P WKT 2010 12 04 06 39 55 31.3200 -97.3300 251.000 457.0 125.909 5.370 -999.990 -999.990 1.259 ..P WKT 2010 12 04 06 49 55 31.3200 -97.3300 251.000 30.0 146.315 4.940 -999.990 -999.990 1.463 ..P WKT 2010 12 04 06 54 55 31.3200 -97.3300 251.000 122.0 150.820 6.270 -999.990 -999.990 1.508 ..P WKT 2010 12 04 06 59 55 31.3200 -97.3300 251.000 457.0 133.798 4.500 -999.990 -999.990 1.338 ..P WKT 2010 12 04 07 04 55 31.3200 -97.3300 251.000 30.0 143.752 4.500 -999.990 -999.990 1.438 ..P WKT 2010 12 04 07 09 55 31.3200 -97.3300 251.000 122.0 146.620 4.420 -999.990 -999.990 1.466 ..P WKT 2010 12 04 07 14 55 31.3200 -97.3300 251.000 457.0 123.072 4.560 -999.990 -999.990 1.231 ..P WKT 2010 12 04 07 24 55 31.3200 -97.3300 251.000 30.0 147.132 4.400 -999.990 -999.990 1.471 ..P WKT 2010 12 04 07 29 55 31.3200 -97.3300 251.000 122.0 145.176 3.820 -999.990 -999.990 1.452 ..P WKT 2010 12 04 07 34 55 31.3200 -97.3300 251.000 457.0 125.803 3.720 -999.990 -999.990 1.258 ..P WKT 2010 12 04 07 39 55 31.3200 -97.3300 251.000 30.0 146.165 3.830 -999.990 -999.990 1.462 ..P WKT 2010 12 04 07 44 55 31.3200 -97.3300 251.000 122.0 139.857 4.170 -999.990 -999.990 1.399 ..P WKT 2010 12 04 07 49 55 31.3200 -97.3300 251.000 457.0 144.433 4.610 -999.990 -999.990 1.444 ..P WKT 2010 12 04 07 59 55 31.3200 -97.3300 251.000 30.0 145.712 3.930 -999.990 -999.990 1.457 ..P WKT 2010 12 04 08 04 55 31.3200 -97.3300 251.000 122.0 135.078 4.010 -999.990 -999.990 1.351 ..P WKT 2010 12 04 08 09 55 31.3200 -97.3300 251.000 457.0 135.185 4.220 -999.990 -999.990 1.352 ..P WKT 2010 12 04 08 14 55 31.3200 -97.3300 251.000 30.0 135.428 4.530 -999.990 -999.990 1.354 ..P WKT 2010 12 04 08 19 55 31.3200 -97.3300 251.000 122.0 134.176 4.820 -999.990 -999.990 1.342 ..P WKT 2010 12 04 08 24 55 31.3200 -97.3300 251.000 457.0 133.196 5.380 -999.990 -999.990 1.332 ..P WKT 2010 12 04 08 34 55 31.3200 -97.3300 251.000 30.0 129.763 5.620 -999.990 -999.990 1.298 ..P WKT 2010 12 04 08 39 55 31.3200 -97.3300 251.000 122.0 127.853 5.280 -999.990 -999.990 1.279 ..P WKT 2010 12 04 08 44 55 31.3200 -97.3300 251.000 457.0 129.882 4.930 -999.990 -999.990 1.299 ..P WKT 2010 12 04 08 49 55 31.3200 -97.3300 251.000 30.0 135.847 4.950 -999.990 -999.990 1.358 ..P WKT 2010 12 04 08 54 55 31.3200 -97.3300 251.000 122.0 127.285 4.650 -999.990 -999.990 1.273 ..P WKT 2010 12 04 08 59 55 31.3200 -97.3300 251.000 457.0 136.099 4.490 -999.990 -999.990 1.361 ..P WKT 2010 12 04 09 09 55 31.3200 -97.3300 251.000 30.0 128.734 4.260 -999.990 -999.990 1.287 ..P WKT 2010 12 04 09 14 55 31.3200 -97.3300 251.000 122.0 131.962 4.710 -999.990 -999.990 1.320 ..P WKT 2010 12 04 09 19 55 31.3200 -97.3300 251.000 457.0 132.070 4.840 -999.990 -999.990 1.321 ..P WKT 2010 12 04 09 24 55 31.3200 -97.3300 251.000 30.0 133.397 5.010 -999.990 -999.990 1.334 ..P WKT 2010 12 04 09 29 55 31.3200 -97.3300 251.000 122.0 135.538 6.060 -999.990 -999.990 1.355 ..P WKT 2010 12 04 09 34 55 31.3200 -97.3300 251.000 457.0 132.798 5.440 -999.990 -999.990 1.328 ..P WKT 2010 12 04 09 44 55 31.3200 -97.3300 251.000 30.0 125.520 4.400 -999.990 -999.990 1.255 ..P WKT 2010 12 04 09 49 55 31.3200 -97.3300 251.000 122.0 126.537 4.470 -999.990 -999.990 1.265 ..P WKT 2010 12 04 09 54 55 31.3200 -97.3300 251.000 457.0 148.963 4.070 -999.990 -999.990 1.490 ..P WKT 2010 12 04 09 59 55 31.3200 -97.3300 251.000 30.0 123.154 4.180 -999.990 -999.990 1.232 ..P WKT 2010 12 04 10 04 55 31.3200 -97.3300 251.000 122.0 126.204 4.530 -999.990 -999.990 1.262 ..P WKT 2010 12 04 10 09 55 31.3200 -97.3300 251.000 457.0 134.805 4.240 -999.990 -999.990 1.348 ..P WKT 2010 12 04 10 19 55 31.3200 -97.3300 251.000 30.0 127.398 4.360 -999.990 -999.990 1.274 ..P WKT 2010 12 04 10 24 55 31.3200 -97.3300 251.000 122.0 125.340 3.960 -999.990 -999.990 1.253 ..P WKT 2010 12 04 10 29 55 31.3200 -97.3300 251.000 457.0 134.381 4.320 -999.990 -999.990 1.344 ..P WKT 2010 12 04 10 34 55 31.3200 -97.3300 251.000 30.0 123.121 4.440 -999.990 -999.990 1.231 ..P WKT 2010 12 04 10 39 55 31.3200 -97.3300 251.000 122.0 130.536 4.350 -999.990 -999.990 1.305 ..P WKT 2010 12 04 10 44 55 31.3200 -97.3300 251.000 457.0 137.948 3.670 -999.990 -999.990 1.379 ..P WKT 2010 12 04 10 54 55 31.3200 -97.3300 251.000 30.0 120.038 4.170 -999.990 -999.990 1.200 ..P WKT 2010 12 04 10 59 55 31.3200 -97.3300 251.000 122.0 132.858 5.110 -999.990 -999.990 1.329 ..P WKT 2010 12 04 11 04 55 31.3200 -97.3300 251.000 457.0 133.506 5.640 -999.990 -999.990 1.335 ..P WKT 2010 12 04 11 09 55 31.3200 -97.3300 251.000 30.0 126.313 5.220 -999.990 -999.990 1.263 ..P WKT 2010 12 04 11 14 55 31.3200 -97.3300 251.000 122.0 135.070 6.000 -999.990 -999.990 1.351 ..P WKT 2010 12 04 11 19 55 31.3200 -97.3300 251.000 457.0 138.691 6.110 -999.990 -999.990 1.387 ..P WKT 2010 12 04 11 29 55 31.3200 -97.3300 251.000 30.0 129.567 7.120 -999.990 -999.990 1.296 ..P WKT 2010 12 04 11 34 55 31.3200 -97.3300 251.000 122.0 142.761 6.480 -999.990 -999.990 1.428 ..P WKT 2010 12 04 11 39 55 31.3200 -97.3300 251.000 457.0 153.791 5.860 -999.990 -999.990 1.538 ..P WKT 2010 12 04 11 44 55 31.3200 -97.3300 251.000 30.0 130.251 6.650 -999.990 -999.990 1.303 ..P WKT 2010 12 04 11 49 55 31.3200 -97.3300 251.000 122.0 140.469 5.250 -999.990 -999.990 1.405 ..P WKT 2010 12 04 12 09 55 31.3200 -97.3300 251.000 457.0 125.818 6.340 -999.990 -999.990 1.258 ..P WKT 2010 12 04 12 10 25 31.3200 -97.3300 251.000 457.0 124.948 6.690 -999.990 -999.990 1.249 ..P WKT 2010 12 04 12 10 55 31.3200 -97.3300 251.000 457.0 135.145 4.930 -999.990 -999.990 1.351 ..P WKT 2010 12 04 12 11 25 31.3200 -97.3300 251.000 457.0 133.464 4.620 -999.990 -999.990 1.335 ..P WKT 2010 12 04 12 11 55 31.3200 -97.3300 251.000 457.0 132.189 4.540 -999.990 -999.990 1.322 ..P WKT 2010 12 04 12 12 25 31.3200 -97.3300 251.000 457.0 133.612 4.480 -999.990 -999.990 1.336 ..P WKT 2010 12 04 12 12 55 31.3200 -97.3300 251.000 457.0 133.011 4.650 -999.990 -999.990 1.330 ..P WKT 2010 12 04 12 13 25 31.3200 -97.3300 251.000 457.0 132.816 4.520 -999.990 -999.990 1.328 ..P WKT 2010 12 04 12 13 55 31.3200 -97.3300 251.000 457.0 130.055 4.350 -999.990 -999.990 1.301 ..P WKT 2010 12 04 12 14 25 31.3200 -97.3300 251.000 457.0 128.375 4.530 -999.990 -999.990 1.284 ..P WKT 2010 12 04 12 14 55 31.3200 -97.3300 251.000 457.0 129.259 5.700 -999.990 -999.990 1.293 ..P WKT 2010 12 04 12 19 55 31.3200 -97.3300 251.000 30.0 133.915 5.290 -999.990 -999.990 1.339 ..P WKT 2010 12 04 12 24 55 31.3200 -97.3300 251.000 122.0 133.712 4.760 -999.990 -999.990 1.337 ..P WKT 2010 12 04 12 29 55 31.3200 -97.3300 251.000 457.0 130.000 5.170 -999.990 -999.990 1.300 ..P WKT 2010 12 04 12 34 55 31.3200 -97.3300 251.000 30.0 126.963 4.790 -999.990 -999.990 1.270 ..P WKT 2010 12 04 12 39 55 31.3200 -97.3300 251.000 122.0 129.594 4.750 -999.990 -999.990 1.296 ..P WKT 2010 12 04 12 44 55 31.3200 -97.3300 251.000 457.0 123.182 4.470 -999.990 -999.990 1.232 ..P WKT 2010 12 04 12 54 55 31.3200 -97.3300 251.000 30.0 131.454 3.670 -999.990 -999.990 1.315 ..P WKT 2010 12 04 12 59 55 31.3200 -97.3300 251.000 122.0 132.642 4.530 -999.990 -999.990 1.326 ..P WKT 2010 12 04 13 04 55 31.3200 -97.3300 251.000 457.0 123.437 5.300 -999.990 -999.990 1.234 ..P WKT 2010 12 04 13 09 55 31.3200 -97.3300 251.000 30.0 135.420 5.460 -999.990 -999.990 1.354 ..P WKT 2010 12 04 13 14 55 31.3200 -97.3300 251.000 122.0 137.013 4.460 -999.990 -999.990 1.370 ..P WKT 2010 12 04 13 19 55 31.3200 -97.3300 251.000 457.0 129.697 4.680 -999.990 -999.990 1.297 ..P WKT 2010 12 04 13 29 55 31.3200 -97.3300 251.000 30.0 141.191 4.020 -999.990 -999.990 1.412 ..P WKT 2010 12 04 13 34 55 31.3200 -97.3300 251.000 122.0 136.922 4.510 -999.990 -999.990 1.369 ..P WKT 2010 12 04 13 39 55 31.3200 -97.3300 251.000 457.0 135.217 4.300 -999.990 -999.990 1.352 ..P WKT 2010 12 04 13 44 55 31.3200 -97.3300 251.000 30.0 139.720 3.970 -999.990 -999.990 1.397 ..P WKT 2010 12 04 13 49 55 31.3200 -97.3300 251.000 122.0 131.269 5.530 -999.990 -999.990 1.313 ..P WKT 2010 12 04 13 54 55 31.3200 -97.3300 251.000 457.0 139.145 3.970 -999.990 -999.990 1.391 ..P WKT 2010 12 04 14 04 55 31.3200 -97.3300 251.000 30.0 136.989 3.920 -999.990 -999.990 1.370 ..P WKT 2010 12 04 14 09 55 31.3200 -97.3300 251.000 122.0 130.060 4.420 -999.990 -999.990 1.301 ..P WKT 2010 12 04 14 14 55 31.3200 -97.3300 251.000 457.0 133.522 4.450 -999.990 -999.990 1.335 ..P WKT 2010 12 04 14 19 55 31.3200 -97.3300 251.000 30.0 139.413 4.140 -999.990 -999.990 1.394 ..P WKT 2010 12 04 14 24 55 31.3200 -97.3300 251.000 122.0 125.602 4.170 -999.990 -999.990 1.256 ..P WKT 2010 12 04 14 29 55 31.3200 -97.3300 251.000 457.0 130.953 3.530 -999.990 -999.990 1.310 ..P WKT 2010 12 04 14 39 55 31.3200 -97.3300 251.000 30.0 135.293 3.560 -999.990 -999.990 1.353 ..P WKT 2010 12 04 14 44 55 31.3200 -97.3300 251.000 122.0 133.203 5.060 -999.990 -999.990 1.332 ..P WKT 2010 12 04 14 49 55 31.3200 -97.3300 251.000 457.0 131.652 4.700 -999.990 -999.990 1.317 ..P WKT 2010 12 04 14 54 55 31.3200 -97.3300 251.000 30.0 141.167 4.250 -999.990 -999.990 1.412 ..P WKT 2010 12 04 14 59 55 31.3200 -97.3300 251.000 122.0 129.092 4.580 -999.990 -999.990 1.291 ..P WKT 2010 12 04 15 04 55 31.3200 -97.3300 251.000 457.0 127.272 3.730 -999.990 -999.990 1.273 ..P WKT 2010 12 04 15 14 55 31.3200 -97.3300 251.000 30.0 131.882 3.940 -999.990 -999.990 1.319 ..P WKT 2010 12 04 15 19 55 31.3200 -97.3300 251.000 122.0 141.011 4.270 -999.990 -999.990 1.410 ..P WKT 2010 12 04 15 24 55 31.3200 -97.3300 251.000 457.0 138.265 4.980 -999.990 -999.990 1.383 ..P WKT 2010 12 04 15 29 55 31.3200 -97.3300 251.000 30.0 132.821 3.820 -999.990 -999.990 1.328 ..P WKT 2010 12 04 15 34 55 31.3200 -97.3300 251.000 122.0 137.092 3.440 -999.990 -999.990 1.371 ..P WKT 2010 12 04 15 39 55 31.3200 -97.3300 251.000 457.0 132.997 3.910 -999.990 -999.990 1.330 ..P WKT 2010 12 04 15 49 55 31.3200 -97.3300 251.000 30.0 134.620 3.570 -999.990 -999.990 1.346 ..P WKT 2010 12 04 15 54 55 31.3200 -97.3300 251.000 122.0 148.702 3.650 -999.990 -999.990 1.487 ..P WKT 2010 12 04 15 59 55 31.3200 -97.3300 251.000 457.0 136.878 4.180 -999.990 -999.990 1.369 ..P WKT 2010 12 04 16 04 55 31.3200 -97.3300 251.000 30.0 130.856 3.710 -999.990 -999.990 1.309 ..P WKT 2010 12 04 16 09 55 31.3200 -97.3300 251.000 122.0 133.739 3.930 -999.990 -999.990 1.337 ..P WKT 2010 12 04 16 14 55 31.3200 -97.3300 251.000 457.0 137.162 5.880 -999.990 -999.990 1.372 ..P WKT 2010 12 04 16 24 55 31.3200 -97.3300 251.000 30.0 140.614 4.870 -999.990 -999.990 1.406 ..P WKT 2010 12 04 16 29 55 31.3200 -97.3300 251.000 122.0 140.915 4.320 -999.990 -999.990 1.409 ..P WKT 2010 12 04 16 34 55 31.3200 -97.3300 251.000 457.0 135.278 4.450 -999.990 -999.990 1.353 ..P WKT 2010 12 04 16 39 55 31.3200 -97.3300 251.000 30.0 135.848 4.160 -999.990 -999.990 1.358 ..P WKT 2010 12 04 16 44 55 31.3200 -97.3300 251.000 122.0 143.704 5.450 -999.990 -999.990 1.437 ..P WKT 2010 12 04 16 49 55 31.3200 -97.3300 251.000 457.0 143.735 5.090 -999.990 -999.990 1.437 ..P WKT 2010 12 04 17 04 55 31.3200 -97.3300 251.000 30.0 136.902 4.180 -999.990 -999.990 1.369 ..P WKT 2010 12 04 17 09 55 31.3200 -97.3300 251.000 122.0 139.136 4.620 -999.990 -999.990 1.391 ..P WKT 2010 12 04 17 14 55 31.3200 -97.3300 251.000 457.0 145.689 4.340 -999.990 -999.990 1.457 ..P WKT 2010 12 04 17 19 55 31.3200 -97.3300 251.000 30.0 147.383 4.900 -999.990 -999.990 1.474 ..P WKT 2010 12 04 17 24 55 31.3200 -97.3300 251.000 122.0 147.324 5.110 -999.990 -999.990 1.473 ..P WKT 2010 12 04 17 29 55 31.3200 -97.3300 251.000 457.0 149.289 5.750 -999.990 -999.990 1.493 ..P WKT 2010 12 04 17 39 55 31.3200 -97.3300 251.000 30.0 139.490 5.150 -999.990 -999.990 1.395 ..P WKT 2010 12 04 17 44 55 31.3200 -97.3300 251.000 122.0 142.295 6.100 -999.990 -999.990 1.423 ..P WKT 2010 12 04 17 49 55 31.3200 -97.3300 251.000 457.0 143.617 4.610 -999.990 -999.990 1.436 ..P WKT 2010 12 04 17 54 55 31.3200 -97.3300 251.000 30.0 150.199 5.370 -999.990 -999.990 1.502 ..P WKT 2010 12 04 17 59 55 31.3200 -97.3300 251.000 122.0 149.767 5.190 -999.990 -999.990 1.498 ..P WKT 2010 12 04 18 04 55 31.3200 -97.3300 251.000 457.0 147.716 4.360 -999.990 -999.990 1.477 ..P WKT 2010 12 04 18 14 55 31.3200 -97.3300 251.000 30.0 150.552 4.760 -999.990 -999.990 1.506 ..P WKT 2010 12 04 18 19 55 31.3200 -97.3300 251.000 122.0 143.567 4.790 -999.990 -999.990 1.436 ..P WKT 2010 12 04 18 24 55 31.3200 -97.3300 251.000 457.0 147.644 4.730 -999.990 -999.990 1.476 ..P WKT 2010 12 04 18 29 55 31.3200 -97.3300 251.000 30.0 143.628 4.360 -999.990 -999.990 1.436 ..P WKT 2010 12 04 18 34 55 31.3200 -97.3300 251.000 122.0 146.086 4.370 -999.990 -999.990 1.461 ..P WKT 2010 12 04 18 39 55 31.3200 -97.3300 251.000 457.0 146.656 5.100 -999.990 -999.990 1.467 ..P WKT 2010 12 04 18 49 55 31.3200 -97.3300 251.000 30.0 148.335 4.250 -999.990 -999.990 1.483 ..P WKT 2010 12 04 18 54 55 31.3200 -97.3300 251.000 122.0 144.049 4.900 -999.990 -999.990 1.440 ..P WKT 2010 12 04 18 59 55 31.3200 -97.3300 251.000 457.0 149.745 4.790 -999.990 -999.990 1.497 ..P WKT 2010 12 04 19 04 55 31.3200 -97.3300 251.000 30.0 153.822 4.710 -999.990 -999.990 1.538 ..P WKT 2010 12 04 19 09 55 31.3200 -97.3300 251.000 122.0 157.089 6.170 -999.990 -999.990 1.571 ..P WKT 2010 12 04 19 14 55 31.3200 -97.3300 251.000 457.0 157.929 7.050 -999.990 -999.990 1.579 ..P WKT 2010 12 04 19 24 55 31.3200 -97.3300 251.000 30.0 156.255 5.610 -999.990 -999.990 1.563 ..P WKT 2010 12 04 19 29 55 31.3200 -97.3300 251.000 122.0 162.375 5.530 -999.990 -999.990 1.624 ..P WKT 2010 12 04 19 34 55 31.3200 -97.3300 251.000 457.0 159.052 4.860 -999.990 -999.990 1.591 ..P WKT 2010 12 04 19 39 55 31.3200 -97.3300 251.000 30.0 167.600 4.420 -999.990 -999.990 1.676 ..P WKT 2010 12 04 19 44 55 31.3200 -97.3300 251.000 122.0 173.719 4.380 -999.990 -999.990 1.737 ..P WKT 2010 12 04 19 49 55 31.3200 -97.3300 251.000 457.0 177.680 5.350 -999.990 -999.990 1.777 ..P WKT 2010 12 04 19 59 55 31.3200 -97.3300 251.000 30.0 176.025 4.310 -999.990 -999.990 1.760 ..P WKT 2010 12 04 20 04 55 31.3200 -97.3300 251.000 122.0 177.423 4.110 -999.990 -999.990 1.774 ..P WKT 2010 12 04 20 09 55 31.3200 -97.3300 251.000 457.0 180.845 4.080 -999.990 -999.990 1.808 ..P WKT 2010 12 04 20 14 55 31.3200 -97.3300 251.000 30.0 184.536 4.200 -999.990 -999.990 1.845 ..P WKT 2010 12 04 20 19 55 31.3200 -97.3300 251.000 122.0 183.236 4.370 -999.990 -999.990 1.832 ..P WKT 2010 12 04 20 24 55 31.3200 -97.3300 251.000 457.0 181.667 3.930 -999.990 -999.990 1.817 ..P WKT 2010 12 04 20 34 55 31.3200 -97.3300 251.000 30.0 186.717 4.710 -999.990 -999.990 1.867 ..P WKT 2010 12 04 20 39 55 31.3200 -97.3300 251.000 122.0 194.550 4.390 -999.990 -999.990 1.946 ..P WKT 2010 12 04 20 44 55 31.3200 -97.3300 251.000 457.0 200.361 4.570 -999.990 -999.990 2.004 ..P WKT 2010 12 04 20 49 55 31.3200 -97.3300 251.000 30.0 201.990 4.600 -999.990 -999.990 2.020 ..P WKT 2010 12 04 20 54 55 31.3200 -97.3300 251.000 122.0 206.316 5.000 -999.990 -999.990 2.063 ..P WKT 2010 12 04 20 59 55 31.3200 -97.3300 251.000 457.0 190.413 5.130 -999.990 -999.990 1.904 ..P WKT 2010 12 04 21 09 55 31.3200 -97.3300 251.000 30.0 188.102 5.900 -999.990 -999.990 1.881 ..P WKT 2010 12 04 21 14 55 31.3200 -97.3300 251.000 122.0 188.749 5.020 -999.990 -999.990 1.887 ..P WKT 2010 12 04 21 19 55 31.3200 -97.3300 251.000 457.0 186.833 5.480 -999.990 -999.990 1.868 ..P WKT 2010 12 04 21 24 55 31.3200 -97.3300 251.000 30.0 183.164 5.880 -999.990 -999.990 1.832 ..P WKT 2010 12 04 21 29 55 31.3200 -97.3300 251.000 122.0 187.992 4.680 -999.990 -999.990 1.880 ..P WKT 2010 12 04 21 34 55 31.3200 -97.3300 251.000 457.0 184.862 5.110 -999.990 -999.990 1.849 ..P WKT 2010 12 04 21 44 55 31.3200 -97.3300 251.000 30.0 185.943 4.540 -999.990 -999.990 1.859 ..P WKT 2010 12 04 21 49 55 31.3200 -97.3300 251.000 122.0 188.805 4.490 -999.990 -999.990 1.888 ..P WKT 2010 12 04 21 54 55 31.3200 -97.3300 251.000 457.0 192.072 4.710 -999.990 -999.990 1.921 ..P WKT 2010 12 04 21 59 55 31.3200 -97.3300 251.000 30.0 179.830 4.950 -999.990 -999.990 1.798 ..P WKT 2010 12 04 22 04 55 31.3200 -97.3300 251.000 122.0 184.849 4.620 -999.990 -999.990 1.848 ..P WKT 2010 12 04 22 09 55 31.3200 -97.3300 251.000 457.0 178.811 4.500 -999.990 -999.990 1.788 ..P WKT 2010 12 04 22 19 55 31.3200 -97.3300 251.000 30.0 173.766 4.620 -999.990 -999.990 1.738 ..P WKT 2010 12 04 22 24 55 31.3200 -97.3300 251.000 122.0 167.747 4.890 -999.990 -999.990 1.677 ..P WKT 2010 12 04 22 29 55 31.3200 -97.3300 251.000 457.0 169.819 5.150 -999.990 -999.990 1.698 ..P WKT 2010 12 04 22 34 55 31.3200 -97.3300 251.000 30.0 165.149 5.430 -999.990 -999.990 1.651 ..P WKT 2010 12 04 22 39 55 31.3200 -97.3300 251.000 122.0 159.130 4.980 -999.990 -999.990 1.591 ..P WKT 2010 12 04 22 44 55 31.3200 -97.3300 251.000 457.0 163.360 4.420 -999.990 -999.990 1.634 ..P WKT 2010 12 04 22 54 55 31.3200 -97.3300 251.000 30.0 155.252 4.410 -999.990 -999.990 1.553 ..P WKT 2010 12 04 22 59 55 31.3200 -97.3300 251.000 122.0 154.781 5.230 -999.990 -999.990 1.548 ..P WKT 2010 12 04 23 04 55 31.3200 -97.3300 251.000 457.0 152.423 5.360 -999.990 -999.990 1.524 ..P WKT 2010 12 04 23 09 55 31.3200 -97.3300 251.000 30.0 148.986 5.160 -999.990 -999.990 1.490 ..P WKT 2010 12 04 23 14 55 31.3200 -97.3300 251.000 122.0 152.291 4.710 -999.990 -999.990 1.523 ..P WKT 2010 12 04 23 19 55 31.3200 -97.3300 251.000 457.0 150.471 5.710 -999.990 -999.990 1.505 ..P WKT 2010 12 04 23 29 55 31.3200 -97.3300 251.000 30.0 151.779 5.000 -999.990 -999.990 1.518 ..P WKT 2010 12 04 23 34 55 31.3200 -97.3300 251.000 122.0 144.388 5.750 -999.990 -999.990 1.444 ..P WKT 2010 12 04 23 39 55 31.3200 -97.3300 251.000 457.0 148.055 5.590 -999.990 -999.990 1.481 ..P WKT 2010 12 04 23 44 55 31.3200 -97.3300 251.000 30.0 147.675 5.360 -999.990 -999.990 1.477 ..P WKT 2010 12 04 23 49 55 31.3200 -97.3300 251.000 122.0 146.757 6.190 -999.990 -999.990 1.468 ..P WKT 2010 12 05 00 09 55 31.3200 -97.3300 251.000 457.0 144.788 5.250 -999.990 -999.990 1.448 ..P WKT 2010 12 05 00 10 25 31.3200 -97.3300 251.000 457.0 141.830 5.210 -999.990 -999.990 1.418 ..P WKT 2010 12 05 00 10 55 31.3200 -97.3300 251.000 457.0 142.107 5.140 -999.990 -999.990 1.421 ..P WKT 2010 12 05 00 11 25 31.3200 -97.3300 251.000 457.0 136.858 5.890 -999.990 -999.990 1.369 ..P WKT 2010 12 05 00 11 55 31.3200 -97.3300 251.000 457.0 137.405 5.680 -999.990 -999.990 1.374 ..P WKT 2010 12 05 00 12 25 31.3200 -97.3300 251.000 457.0 138.492 4.910 -999.990 -999.990 1.385 ..P WKT 2010 12 05 00 12 55 31.3200 -97.3300 251.000 457.0 138.096 5.380 -999.990 -999.990 1.381 ..P WKT 2010 12 05 00 13 25 31.3200 -97.3300 251.000 457.0 137.025 5.290 -999.990 -999.990 1.370 ..P WKT 2010 12 05 00 13 55 31.3200 -97.3300 251.000 457.0 139.595 5.030 -999.990 -999.990 1.396 ..P WKT 2010 12 05 00 14 25 31.3200 -97.3300 251.000 457.0 136.772 4.770 -999.990 -999.990 1.368 ..P WKT 2010 12 05 00 14 55 31.3200 -97.3300 251.000 457.0 136.915 5.070 -999.990 -999.990 1.369 ..P WKT 2010 12 05 00 19 55 31.3200 -97.3300 251.000 30.0 132.683 5.540 -999.990 -999.990 1.327 ..P WKT 2010 12 05 00 24 55 31.3200 -97.3300 251.000 122.0 135.864 5.550 -999.990 -999.990 1.359 ..P WKT 2010 12 05 00 29 55 31.3200 -97.3300 251.000 457.0 133.790 5.340 -999.990 -999.990 1.338 ..P WKT 2010 12 05 00 34 55 31.3200 -97.3300 251.000 30.0 132.658 4.510 -999.990 -999.990 1.327 ..P WKT 2010 12 05 00 39 55 31.3200 -97.3300 251.000 122.0 134.761 5.280 -999.990 -999.990 1.348 ..P WKT 2010 12 05 00 44 55 31.3200 -97.3300 251.000 457.0 139.828 4.290 -999.990 -999.990 1.398 ..P WKT 2010 12 05 00 54 55 31.3200 -97.3300 251.000 30.0 133.641 4.940 -999.990 -999.990 1.336 ..P WKT 2010 12 05 00 59 55 31.3200 -97.3300 251.000 122.0 135.187 4.750 -999.990 -999.990 1.352 ..P WKT 2010 12 05 01 04 55 31.3200 -97.3300 251.000 457.0 135.926 5.190 -999.990 -999.990 1.359 ..P WKT 2010 12 05 01 09 55 31.3200 -97.3300 251.000 30.0 128.176 5.250 -999.990 -999.990 1.282 ..P WKT 2010 12 05 01 14 55 31.3200 -97.3300 251.000 122.0 127.028 4.500 -999.990 -999.990 1.270 ..P WKT 2010 12 05 01 19 55 31.3200 -97.3300 251.000 457.0 127.901 5.230 -999.990 -999.990 1.279 ..P WKT 2010 12 05 01 29 55 31.3200 -97.3300 251.000 30.0 127.164 4.670 -999.990 -999.990 1.272 ..P WKT 2010 12 05 01 34 55 31.3200 -97.3300 251.000 122.0 131.212 4.700 -999.990 -999.990 1.312 ..P WKT 2010 12 05 01 39 55 31.3200 -97.3300 251.000 457.0 133.238 4.540 -999.990 -999.990 1.332 ..P WKT 2010 12 05 01 44 55 31.3200 -97.3300 251.000 30.0 124.761 4.770 -999.990 -999.990 1.248 ..P WKT 2010 12 05 01 49 55 31.3200 -97.3300 251.000 122.0 137.291 4.080 -999.990 -999.990 1.373 ..P WKT 2010 12 05 01 54 55 31.3200 -97.3300 251.000 457.0 138.913 3.940 -999.990 -999.990 1.389 ..P WKT 2010 12 05 02 04 55 31.3200 -97.3300 251.000 30.0 133.367 4.400 -999.990 -999.990 1.334 ..P WKT 2010 12 05 02 09 55 31.3200 -97.3300 251.000 122.0 131.721 3.820 -999.990 -999.990 1.317 ..P WKT 2010 12 05 02 14 55 31.3200 -97.3300 251.000 457.0 137.881 4.720 -999.990 -999.990 1.379 ..P WKT 2010 12 05 02 19 55 31.3200 -97.3300 251.000 30.0 128.965 4.760 -999.990 -999.990 1.290 ..P WKT 2010 12 05 02 24 55 31.3200 -97.3300 251.000 122.0 137.279 4.310 -999.990 -999.990 1.373 ..P WKT 2010 12 05 02 29 55 31.3200 -97.3300 251.000 457.0 132.940 4.290 -999.990 -999.990 1.329 ..P WKT 2010 12 05 02 39 55 31.3200 -97.3300 251.000 30.0 131.530 4.270 -999.990 -999.990 1.315 ..P WKT 2010 12 05 02 44 55 31.3200 -97.3300 251.000 122.0 132.844 4.480 -999.990 -999.990 1.328 ..P WKT 2010 12 05 02 49 55 31.3200 -97.3300 251.000 457.0 131.736 4.020 -999.990 -999.990 1.317 ..P WKT 2010 12 05 02 54 55 31.3200 -97.3300 251.000 30.0 132.242 4.290 -999.990 -999.990 1.322 ..P WKT 2010 12 05 02 59 55 31.3200 -97.3300 251.000 122.0 133.556 3.740 -999.990 -999.990 1.336 ..P WKT 2010 12 05 03 04 55 31.3200 -97.3300 251.000 457.0 137.291 3.740 -999.990 -999.990 1.373 ..P WKT 2010 12 05 03 14 55 31.3200 -97.3300 251.000 30.0 139.763 3.710 -999.990 -999.990 1.398 ..P WKT 2010 12 05 03 19 55 31.3200 -97.3300 251.000 122.0 137.425 4.020 -999.990 -999.990 1.374 ..P WKT 2010 12 05 03 24 55 31.3200 -97.3300 251.000 457.0 136.702 4.560 -999.990 -999.990 1.367 ..P WKT 2010 12 05 03 29 55 31.3200 -97.3300 251.000 30.0 132.481 4.830 -999.990 -999.990 1.325 ..P WKT 2010 12 05 03 34 55 31.3200 -97.3300 251.000 122.0 135.792 5.010 -999.990 -999.990 1.358 ..P WKT 2010 12 05 03 39 55 31.3200 -97.3300 251.000 457.0 124.849 5.970 -999.990 -999.990 1.248 ..P WKT 2010 12 05 03 49 55 31.3200 -97.3300 251.000 30.0 136.158 6.270 -999.990 -999.990 1.362 ..P WKT 2010 12 05 03 54 55 31.3200 -97.3300 251.000 122.0 142.810 5.910 -999.990 -999.990 1.428 ..P WKT 2010 12 05 03 59 55 31.3200 -97.3300 251.000 457.0 127.547 6.640 -999.990 -999.990 1.275 ..P WKT 2010 12 05 04 04 55 31.3200 -97.3300 251.000 30.0 141.189 7.640 -999.990 -999.990 1.412 ..P WKT 2010 12 05 04 09 55 31.3200 -97.3300 251.000 122.0 141.926 6.060 -999.990 -999.990 1.419 ..P WKT 2010 12 05 04 14 55 31.3200 -97.3300 251.000 457.0 130.160 6.090 -999.990 -999.990 1.302 ..P WKT 2010 12 05 04 24 55 31.3200 -97.3300 251.000 30.0 140.139 6.330 -999.990 -999.990 1.401 ..P WKT 2010 12 05 04 29 55 31.3200 -97.3300 251.000 122.0 141.719 5.180 -999.990 -999.990 1.417 ..P WKT 2010 12 05 04 34 55 31.3200 -97.3300 251.000 457.0 137.655 4.670 -999.990 -999.990 1.377 ..P WKT 2010 12 05 04 39 55 31.3200 -97.3300 251.000 30.0 136.952 4.960 -999.990 -999.990 1.370 ..P WKT 2010 12 05 04 44 55 31.3200 -97.3300 251.000 122.0 135.442 4.980 -999.990 -999.990 1.354 ..P WKT 2010 12 05 04 49 55 31.3200 -97.3300 251.000 457.0 138.903 3.650 -999.990 -999.990 1.389 ..P WKT 2010 12 05 05 04 55 31.3200 -97.3300 251.000 30.0 134.921 3.660 -999.990 -999.990 1.349 ..P WKT 2010 12 05 05 09 55 31.3200 -97.3300 251.000 122.0 131.132 4.240 -999.990 -999.990 1.311 ..P WKT 2010 12 05 05 14 55 31.3200 -97.3300 251.000 457.0 143.732 3.580 -999.990 -999.990 1.437 ..P WKT 2010 12 05 05 19 55 31.3200 -97.3300 251.000 30.0 131.213 3.610 -999.990 -999.990 1.312 ..P WKT 2010 12 05 05 24 55 31.3200 -97.3300 251.000 122.0 129.037 3.620 -999.990 -999.990 1.290 ..P WKT 2010 12 05 05 29 55 31.3200 -97.3300 251.000 457.0 140.426 3.700 -999.990 -999.990 1.404 ..P WKT 2010 12 05 05 39 55 31.3200 -97.3300 251.000 30.0 136.242 4.020 -999.990 -999.990 1.362 ..P WKT 2010 12 05 05 44 55 31.3200 -97.3300 251.000 122.0 137.860 3.660 -999.990 -999.990 1.379 ..P WKT 2010 12 05 05 49 55 31.3200 -97.3300 251.000 457.0 141.760 3.470 -999.990 -999.990 1.418 ..P WKT 2010 12 05 05 54 55 31.3200 -97.3300 251.000 30.0 135.590 3.990 -999.990 -999.990 1.356 ..P WKT 2010 12 05 05 59 55 31.3200 -97.3300 251.000 122.0 131.838 4.770 -999.990 -999.990 1.318 ..P WKT 2010 12 05 06 04 55 31.3200 -97.3300 251.000 457.0 139.631 3.160 -999.990 -999.990 1.396 ..P WKT 2010 12 05 06 14 55 31.3200 -97.3300 251.000 30.0 129.097 3.520 -999.990 -999.990 1.291 ..P WKT 2010 12 05 06 19 55 31.3200 -97.3300 251.000 122.0 128.221 3.990 -999.990 -999.990 1.282 ..P WKT 2010 12 05 06 24 55 31.3200 -97.3300 251.000 457.0 134.057 3.120 -999.990 -999.990 1.341 ..P WKT 2010 12 05 06 29 55 31.3200 -97.3300 251.000 30.0 134.524 3.650 -999.990 -999.990 1.345 ..P WKT 2010 12 05 06 34 55 31.3200 -97.3300 251.000 122.0 136.868 3.370 -999.990 -999.990 1.369 ..P WKT 2010 12 05 06 39 55 31.3200 -97.3300 251.000 457.0 129.821 3.840 -999.990 -999.990 1.298 ..P WKT 2010 12 05 06 49 55 31.3200 -97.3300 251.000 30.0 138.038 3.990 -999.990 -999.990 1.380 ..P WKT 2010 12 05 06 54 55 31.3200 -97.3300 251.000 122.0 146.324 3.530 -999.990 -999.990 1.463 ..P WKT 2010 12 05 06 59 55 31.3200 -97.3300 251.000 457.0 135.023 3.530 -999.990 -999.990 1.350 ..P WKT 2010 12 05 07 04 55 31.3200 -97.3300 251.000 30.0 138.210 3.820 -999.990 -999.990 1.382 ..P WKT 2010 12 05 07 09 55 31.3200 -97.3300 251.000 122.0 142.739 3.990 -999.990 -999.990 1.427 ..P WKT 2010 12 05 07 14 55 31.3200 -97.3300 251.000 457.0 129.830 3.940 -999.990 -999.990 1.298 ..P WKT 2010 12 05 07 24 55 31.3200 -97.3300 251.000 30.0 141.416 4.530 -999.990 -999.990 1.414 ..P WKT 2010 12 05 07 29 55 31.3200 -97.3300 251.000 122.0 139.621 3.530 -999.990 -999.990 1.396 ..P WKT 2010 12 05 07 34 55 31.3200 -97.3300 251.000 457.0 132.463 3.320 -999.990 -999.990 1.325 ..P WKT 2010 12 05 07 39 55 31.3200 -97.3300 251.000 30.0 141.396 3.780 -999.990 -999.990 1.414 ..P WKT 2010 12 05 07 44 55 31.3200 -97.3300 251.000 122.0 136.384 3.120 -999.990 -999.990 1.364 ..P WKT 2010 12 05 07 49 55 31.3200 -97.3300 251.000 457.0 130.702 3.240 -999.990 -999.990 1.307 ..P WKT 2010 12 05 07 59 55 31.3200 -97.3300 251.000 30.0 142.971 3.700 -999.990 -999.990 1.430 ..P WKT 2010 12 05 08 04 55 31.3200 -97.3300 251.000 122.0 142.423 2.890 -999.990 -999.990 1.424 ..P WKT 2010 12 05 08 09 55 31.3200 -97.3300 251.000 457.0 132.357 2.870 -999.990 -999.990 1.324 ..P WKT 2010 12 05 08 14 55 31.3200 -97.3300 251.000 30.0 136.365 5.110 -999.990 -999.990 1.364 ..P WKT 2010 12 05 08 19 55 31.3200 -97.3300 251.000 122.0 143.456 3.280 -999.990 -999.990 1.435 ..P WKT 2010 12 05 08 24 55 31.3200 -97.3300 251.000 457.0 138.484 3.710 -999.990 -999.990 1.385 ..P WKT 2010 12 05 08 34 55 31.3200 -97.3300 251.000 30.0 143.015 2.960 -999.990 -999.990 1.430 ..P WKT 2010 12 05 08 39 55 31.3200 -97.3300 251.000 122.0 144.609 3.090 -999.990 -999.990 1.446 ..P WKT 2010 12 05 08 44 55 31.3200 -97.3300 251.000 457.0 132.001 3.160 -999.990 -999.990 1.320 ..P WKT 2010 12 05 08 49 55 31.3200 -97.3300 251.000 30.0 143.377 3.540 -999.990 -999.990 1.434 ..P WKT 2010 12 05 08 54 55 31.3200 -97.3300 251.000 122.0 138.273 3.270 -999.990 -999.990 1.383 ..P WKT 2010 12 05 08 59 55 31.3200 -97.3300 251.000 457.0 133.304 3.670 -999.990 -999.990 1.333 ..P WKT 2010 12 05 09 09 55 31.3200 -97.3300 251.000 30.0 137.239 2.900 -999.990 -999.990 1.372 ..P WKT 2010 12 05 09 14 55 31.3200 -97.3300 251.000 122.0 134.758 3.010 -999.990 -999.990 1.348 ..P WKT 2010 12 05 09 19 55 31.3200 -97.3300 251.000 457.0 125.180 3.830 -999.990 -999.990 1.252 ..P WKT 2010 12 05 09 24 55 31.3200 -97.3300 251.000 30.0 135.288 3.310 -999.990 -999.990 1.353 ..P WKT 2010 12 05 09 29 55 31.3200 -97.3300 251.000 122.0 139.235 2.820 -999.990 -999.990 1.392 ..P WKT 2010 12 05 09 34 55 31.3200 -97.3300 251.000 457.0 131.533 3.040 -999.990 -999.990 1.315 ..P WKT 2010 12 05 09 44 55 31.3200 -97.3300 251.000 30.0 140.516 2.950 -999.990 -999.990 1.405 ..P WKT 2010 12 05 09 49 55 31.3200 -97.3300 251.000 122.0 137.386 3.050 -999.990 -999.990 1.374 ..P WKT 2010 12 05 09 54 55 31.3200 -97.3300 251.000 457.0 136.933 3.600 -999.990 -999.990 1.369 ..P WKT 2010 12 05 09 59 55 31.3200 -97.3300 251.000 30.0 142.371 3.520 -999.990 -999.990 1.424 ..P WKT 2010 12 05 10 04 55 31.3200 -97.3300 251.000 122.0 142.453 4.100 -999.990 -999.990 1.425 ..P WKT 2010 12 05 10 09 55 31.3200 -97.3300 251.000 457.0 130.490 4.100 -999.990 -999.990 1.305 ..P WKT 2010 12 05 10 19 55 31.3200 -97.3300 251.000 30.0 135.665 4.040 -999.990 -999.990 1.357 ..P WKT 2010 12 05 10 24 55 31.3200 -97.3300 251.000 122.0 132.996 4.470 -999.990 -999.990 1.330 ..P WKT 2010 12 05 10 29 55 31.3200 -97.3300 251.000 457.0 125.242 3.640 -999.990 -999.990 1.252 ..P WKT 2010 12 05 10 34 55 31.3200 -97.3300 251.000 30.0 132.206 4.120 -999.990 -999.990 1.322 ..P WKT 2010 12 05 10 39 55 31.3200 -97.3300 251.000 122.0 131.410 4.570 -999.990 -999.990 1.314 ..P WKT 2010 12 05 10 44 55 31.3200 -97.3300 251.000 457.0 123.658 3.120 -999.990 -999.990 1.237 ..P WKT 2010 12 05 10 54 55 31.3200 -97.3300 251.000 30.0 137.508 3.900 -999.990 -999.990 1.375 ..P WKT 2010 12 05 10 59 55 31.3200 -97.3300 251.000 122.0 140.915 3.730 -999.990 -999.990 1.409 ..P WKT 2010 12 05 11 04 55 31.3200 -97.3300 251.000 457.0 125.865 2.940 -999.990 -999.990 1.259 ..P WKT 2010 12 05 11 09 55 31.3200 -97.3300 251.000 30.0 128.738 4.640 -999.990 -999.990 1.287 ..P WKT 2010 12 05 11 14 55 31.3200 -97.3300 251.000 122.0 128.668 2.960 -999.990 -999.990 1.287 ..P WKT 2010 12 05 11 19 55 31.3200 -97.3300 251.000 457.0 119.773 2.870 -999.990 -999.990 1.198 ..P WKT 2010 12 05 11 29 55 31.3200 -97.3300 251.000 30.0 126.597 3.150 -999.990 -999.990 1.266 ..P WKT 2010 12 05 11 34 55 31.3200 -97.3300 251.000 122.0 134.024 4.480 -999.990 -999.990 1.340 ..P WKT 2010 12 05 11 39 55 31.3200 -97.3300 251.000 457.0 116.183 4.060 -999.990 -999.990 1.162 ..P WKT 2010 12 05 11 44 55 31.3200 -97.3300 251.000 30.0 132.701 3.950 -999.990 -999.990 1.327 ..P WKT 2010 12 05 11 49 55 31.3200 -97.3300 251.000 122.0 135.983 3.210 -999.990 -999.990 1.360 ..P WKT 2010 12 05 12 09 55 31.3200 -97.3300 251.000 457.0 123.055 2.930 -999.990 -999.990 1.231 ..P WKT 2010 12 05 12 10 25 31.3200 -97.3300 251.000 457.0 124.980 3.250 -999.990 -999.990 1.250 ..P WKT 2010 12 05 12 10 55 31.3200 -97.3300 251.000 457.0 123.964 2.920 -999.990 -999.990 1.240 ..P WKT 2010 12 05 12 11 25 31.3200 -97.3300 251.000 457.0 121.611 2.860 -999.990 -999.990 1.216 ..P WKT 2010 12 05 12 11 55 31.3200 -97.3300 251.000 457.0 122.868 2.700 -999.990 -999.990 1.229 ..P WKT 2010 12 05 12 12 25 31.3200 -97.3300 251.000 457.0 123.055 3.030 -999.990 -999.990 1.231 ..P WKT 2010 12 05 12 12 55 31.3200 -97.3300 251.000 457.0 121.905 4.020 -999.990 -999.990 1.219 ..P WKT 2010 12 05 12 13 25 31.3200 -97.3300 251.000 457.0 119.552 3.340 -999.990 -999.990 1.196 ..P WKT 2010 12 05 12 13 55 31.3200 -97.3300 251.000 457.0 119.873 3.040 -999.990 -999.990 1.199 ..P WKT 2010 12 05 12 14 25 31.3200 -97.3300 251.000 457.0 121.131 3.550 -999.990 -999.990 1.211 ..P WKT 2010 12 05 12 14 55 31.3200 -97.3300 251.000 457.0 117.440 3.760 -999.990 -999.990 1.174 ..P WKT 2010 12 05 12 19 55 31.3200 -97.3300 251.000 30.0 123.993 3.040 -999.990 -999.990 1.240 ..P WKT 2010 12 05 12 24 55 31.3200 -97.3300 251.000 122.0 125.733 3.790 -999.990 -999.990 1.257 ..P WKT 2010 12 05 12 29 55 31.3200 -97.3300 251.000 457.0 121.054 4.990 -999.990 -999.990 1.211 ..P WKT 2010 12 05 12 34 55 31.3200 -97.3300 251.000 30.0 128.948 3.500 -999.990 -999.990 1.289 ..P WKT 2010 12 05 12 39 55 31.3200 -97.3300 251.000 122.0 123.196 4.590 -999.990 -999.990 1.232 ..P WKT 2010 12 05 12 44 55 31.3200 -97.3300 251.000 457.0 118.782 4.240 -999.990 -999.990 1.188 ..P WKT 2010 12 05 12 54 55 31.3200 -97.3300 251.000 30.0 125.748 3.820 -999.990 -999.990 1.257 ..P WKT 2010 12 05 12 59 55 31.3200 -97.3300 251.000 122.0 128.297 3.830 -999.990 -999.990 1.283 ..P WKT 2010 12 05 13 04 55 31.3200 -97.3300 251.000 457.0 118.396 3.570 -999.990 -999.990 1.184 ..P WKT 2010 12 05 13 09 55 31.3200 -97.3300 251.000 30.0 125.364 3.860 -999.990 -999.990 1.254 ..P WKT 2010 12 05 13 14 55 31.3200 -97.3300 251.000 122.0 125.771 3.790 -999.990 -999.990 1.258 ..P WKT 2010 12 05 13 19 55 31.3200 -97.3300 251.000 457.0 116.269 4.130 -999.990 -999.990 1.163 ..P WKT 2010 12 05 13 29 55 31.3200 -97.3300 251.000 30.0 126.517 3.360 -999.990 -999.990 1.265 ..P WKT 2010 12 05 13 34 55 31.3200 -97.3300 251.000 122.0 122.293 3.130 -999.990 -999.990 1.223 ..P WKT 2010 12 05 13 39 55 31.3200 -97.3300 251.000 457.0 117.264 3.520 -999.990 -999.990 1.173 ..P WKT 2010 12 05 13 44 55 31.3200 -97.3300 251.000 30.0 127.511 3.780 -999.990 -999.990 1.275 ..P WKT 2010 12 05 13 49 55 31.3200 -97.3300 251.000 122.0 118.193 4.920 -999.990 -999.990 1.182 ..P WKT 2010 12 05 13 54 55 31.3200 -97.3300 251.000 457.0 126.030 2.910 -999.990 -999.990 1.260 ..P WKT 2010 12 05 14 04 55 31.3200 -97.3300 251.000 30.0 126.847 2.830 -999.990 -999.990 1.268 ..P WKT 2010 12 05 14 09 55 31.3200 -97.3300 251.000 122.0 132.427 3.090 -999.990 -999.990 1.324 ..P WKT 2010 12 05 14 14 55 31.3200 -97.3300 251.000 457.0 126.744 4.690 -999.990 -999.990 1.267 ..P WKT 2010 12 05 14 19 55 31.3200 -97.3300 251.000 30.0 132.594 4.370 -999.990 -999.990 1.326 ..P WKT 2010 12 05 14 24 55 31.3200 -97.3300 251.000 122.0 132.274 4.280 -999.990 -999.990 1.323 ..P WKT 2010 12 05 14 29 55 31.3200 -97.3300 251.000 457.0 129.272 5.130 -999.990 -999.990 1.293 ..P WKT 2010 12 05 14 39 55 31.3200 -97.3300 251.000 30.0 131.624 4.120 -999.990 -999.990 1.316 ..P WKT 2010 12 05 14 44 55 31.3200 -97.3300 251.000 122.0 139.396 4.160 -999.990 -999.990 1.394 ..P WKT 2010 12 05 14 49 55 31.3200 -97.3300 251.000 457.0 131.062 5.110 -999.990 -999.990 1.311 ..P WKT 2010 12 05 14 54 55 31.3200 -97.3300 251.000 30.0 135.614 4.410 -999.990 -999.990 1.356 ..P WKT 2010 12 05 14 59 55 31.3200 -97.3300 251.000 122.0 130.500 4.210 -999.990 -999.990 1.305 ..P WKT 2010 12 05 15 04 55 31.3200 -97.3300 251.000 457.0 127.533 3.430 -999.990 -999.990 1.275 ..P WKT 2010 12 05 15 14 55 31.3200 -97.3300 251.000 30.0 134.472 3.310 -999.990 -999.990 1.345 ..P WKT 2010 12 05 15 19 55 31.3200 -97.3300 251.000 122.0 133.635 3.960 -999.990 -999.990 1.336 ..P WKT 2010 12 05 15 24 55 31.3200 -97.3300 251.000 457.0 131.454 3.380 -999.990 -999.990 1.315 ..P WKT 2010 12 05 15 29 55 31.3200 -97.3300 251.000 30.0 125.242 4.170 -999.990 -999.990 1.252 ..P WKT 2010 12 05 15 34 55 31.3200 -97.3300 251.000 122.0 128.300 3.390 -999.990 -999.990 1.283 ..P WKT 2010 12 05 15 39 55 31.3200 -97.3300 251.000 457.0 132.165 3.360 -999.990 -999.990 1.322 ..P WKT 2010 12 05 15 49 55 31.3200 -97.3300 251.000 30.0 133.888 4.910 -999.990 -999.990 1.339 ..P WKT 2010 12 05 15 54 55 31.3200 -97.3300 251.000 122.0 130.130 3.680 -999.990 -999.990 1.301 ..P WKT 2010 12 05 15 59 55 31.3200 -97.3300 251.000 457.0 132.557 3.680 -999.990 -999.990 1.326 ..P WKT 2010 12 05 16 04 55 31.3200 -97.3300 251.000 30.0 132.161 5.100 -999.990 -999.990 1.322 ..P WKT 2010 12 05 16 09 55 31.3200 -97.3300 251.000 122.0 131.361 4.080 -999.990 -999.990 1.314 ..P WKT 2010 12 05 16 14 55 31.3200 -97.3300 251.000 457.0 131.906 4.320 -999.990 -999.990 1.319 ..P WKT 2010 12 05 16 24 55 31.3200 -97.3300 251.000 30.0 129.421 4.420 -999.990 -999.990 1.294 ..P WKT 2010 12 05 16 29 55 31.3200 -97.3300 251.000 122.0 137.961 4.190 -999.990 -999.990 1.380 ..P WKT 2010 12 05 16 34 55 31.3200 -97.3300 251.000 457.0 138.968 4.340 -999.990 -999.990 1.390 ..P WKT 2010 12 05 16 39 55 31.3200 -97.3300 251.000 30.0 129.344 4.180 -999.990 -999.990 1.293 ..P WKT 2010 12 05 16 44 55 31.3200 -97.3300 251.000 122.0 129.677 4.500 -999.990 -999.990 1.297 ..P WKT 2010 12 05 16 49 55 31.3200 -97.3300 251.000 457.0 128.530 5.390 -999.990 -999.990 1.285 ..P WKT 2010 12 05 17 04 55 31.3200 -97.3300 251.000 30.0 134.156 4.890 -999.990 -999.990 1.342 ..P WKT 2010 12 05 17 09 55 31.3200 -97.3300 251.000 122.0 127.512 4.590 -999.990 -999.990 1.275 ..P WKT 2010 12 05 17 14 55 31.3200 -97.3300 251.000 457.0 129.620 4.320 -999.990 -999.990 1.296 ..P WKT 2010 12 05 17 19 55 31.3200 -97.3300 251.000 30.0 129.843 5.020 -999.990 -999.990 1.298 ..P WKT 2010 12 05 17 24 55 31.3200 -97.3300 251.000 122.0 132.895 4.990 -999.990 -999.990 1.329 ..P WKT 2010 12 05 17 29 55 31.3200 -97.3300 251.000 457.0 135.005 4.360 -999.990 -999.990 1.350 ..P WKT 2010 12 05 17 39 55 31.3200 -97.3300 251.000 30.0 134.601 4.180 -999.990 -999.990 1.346 ..P WKT 2010 12 05 17 44 55 31.3200 -97.3300 251.000 122.0 131.276 4.270 -999.990 -999.990 1.313 ..P WKT 2010 12 05 17 49 55 31.3200 -97.3300 251.000 457.0 137.118 4.390 -999.990 -999.990 1.371 ..P WKT 2010 12 05 17 54 55 31.3200 -97.3300 251.000 30.0 132.176 4.350 -999.990 -999.990 1.322 ..P WKT 2010 12 05 17 59 55 31.3200 -97.3300 251.000 122.0 133.705 4.850 -999.990 -999.990 1.337 ..P WKT 2010 12 05 18 04 55 31.3200 -97.3300 251.000 457.0 135.233 4.670 -999.990 -999.990 1.352 ..P WKT 2010 12 05 18 14 55 31.3200 -97.3300 251.000 30.0 134.979 4.500 -999.990 -999.990 1.350 ..P WKT 2010 12 05 18 19 55 31.3200 -97.3300 251.000 122.0 133.733 4.830 -999.990 -999.990 1.337 ..P WKT 2010 12 05 18 24 55 31.3200 -97.3300 251.000 457.0 135.725 4.960 -999.990 -999.990 1.357 ..P WKT 2010 12 05 18 29 55 31.3200 -97.3300 251.000 30.0 137.718 4.770 -999.990 -999.990 1.377 ..P WKT 2010 12 05 18 34 55 31.3200 -97.3300 251.000 122.0 136.742 4.600 -999.990 -999.990 1.367 ..P WKT 2010 12 05 18 39 55 31.3200 -97.3300 251.000 457.0 134.147 6.520 -999.990 -999.990 1.341 ..P WKT 2010 12 05 18 49 55 31.3200 -97.3300 251.000 30.0 135.087 4.730 -999.990 -999.990 1.351 ..P WKT 2010 12 05 18 54 55 31.3200 -97.3300 251.000 122.0 130.522 5.630 -999.990 -999.990 1.305 ..P WKT 2010 12 05 18 59 55 31.3200 -97.3300 251.000 457.0 130.009 4.520 -999.990 -999.990 1.300 ..P WKT 2010 12 05 19 04 55 31.3200 -97.3300 251.000 30.0 132.465 5.050 -999.990 -999.990 1.325 ..P WKT 2010 12 05 19 09 55 31.3200 -97.3300 251.000 122.0 134.112 4.530 -999.990 -999.990 1.341 ..P WKT 2010 12 05 19 14 55 31.3200 -97.3300 251.000 457.0 129.276 5.170 -999.990 -999.990 1.293 ..P WKT 2010 12 05 19 24 55 31.3200 -97.3300 251.000 30.0 135.446 4.630 -999.990 -999.990 1.354 ..P WKT 2010 12 05 19 29 55 31.3200 -97.3300 251.000 122.0 138.348 4.600 -999.990 -999.990 1.383 ..P WKT 2010 12 05 19 34 55 31.3200 -97.3300 251.000 457.0 138.279 5.090 -999.990 -999.990 1.383 ..P WKT 2010 12 05 19 39 55 31.3200 -97.3300 251.000 30.0 137.128 5.080 -999.990 -999.990 1.371 ..P WKT 2010 12 05 19 44 55 31.3200 -97.3300 251.000 122.0 141.113 4.730 -999.990 -999.990 1.411 ..P WKT 2010 12 05 19 49 55 31.3200 -97.3300 251.000 457.0 136.448 4.880 -999.990 -999.990 1.364 ..P WKT 2010 12 05 19 59 55 31.3200 -97.3300 251.000 30.0 134.414 6.200 -999.990 -999.990 1.344 ..P WKT 2010 12 05 20 04 55 31.3200 -97.3300 251.000 122.0 130.287 5.490 -999.990 -999.990 1.303 ..P WKT 2010 12 05 20 09 55 31.3200 -97.3300 251.000 457.0 134.545 5.140 -999.990 -999.990 1.345 ..P WKT 2010 12 05 20 14 55 31.3200 -97.3300 251.000 30.0 131.499 5.250 -999.990 -999.990 1.315 ..P WKT 2010 12 05 20 19 55 31.3200 -97.3300 251.000 122.0 132.376 5.150 -999.990 -999.990 1.324 ..P WKT 2010 12 05 20 24 55 31.3200 -97.3300 251.000 457.0 125.676 5.030 -999.990 -999.990 1.257 ..P WKT 2010 12 05 20 34 55 31.3200 -97.3300 251.000 30.0 133.440 5.230 -999.990 -999.990 1.334 ..P WKT 2010 12 05 20 39 55 31.3200 -97.3300 251.000 122.0 132.481 5.730 -999.990 -999.990 1.325 ..P WKT 2010 12 05 20 44 55 31.3200 -97.3300 251.000 457.0 130.844 5.650 -999.990 -999.990 1.308 ..P WKT 2010 12 05 20 49 55 31.3200 -97.3300 251.000 30.0 135.434 5.350 -999.990 -999.990 1.354 ..P WKT 2010 12 05 20 54 55 31.3200 -97.3300 251.000 122.0 129.330 5.730 -999.990 -999.990 1.293 ..P WKT 2010 12 05 20 59 55 31.3200 -97.3300 251.000 457.0 131.483 6.230 -999.990 -999.990 1.315 ..P WKT 2010 12 05 21 09 55 31.3200 -97.3300 251.000 30.0 136.141 5.720 -999.990 -999.990 1.361 ..P WKT 2010 12 05 21 14 55 31.3200 -97.3300 251.000 122.0 134.446 5.420 -999.990 -999.990 1.344 ..P WKT 2010 12 05 21 19 55 31.3200 -97.3300 251.000 457.0 140.742 5.330 -999.990 -999.990 1.407 ..P WKT 2010 12 05 21 24 55 31.3200 -97.3300 251.000 30.0 138.370 5.580 -999.990 -999.990 1.384 ..P WKT 2010 12 05 21 29 55 31.3200 -97.3300 251.000 122.0 136.403 5.230 -999.990 -999.990 1.364 ..P WKT 2010 12 05 21 34 55 31.3200 -97.3300 251.000 457.0 137.824 5.160 -999.990 -999.990 1.378 ..P WKT 2010 12 05 21 44 55 31.3200 -97.3300 251.000 30.0 140.666 5.390 -999.990 -999.990 1.407 ..P WKT 2010 12 05 21 49 55 31.3200 -97.3300 251.000 122.0 140.732 5.430 -999.990 -999.990 1.407 ..P WKT 2010 12 05 21 54 55 31.3200 -97.3300 251.000 457.0 141.882 6.040 -999.990 -999.990 1.419 ..P WKT 2010 12 05 21 59 55 31.3200 -97.3300 251.000 30.0 138.695 6.490 -999.990 -999.990 1.387 ..P WKT 2010 12 05 22 04 55 31.3200 -97.3300 251.000 122.0 139.845 5.920 -999.990 -999.990 1.398 ..P WKT 2010 12 05 22 09 55 31.3200 -97.3300 251.000 457.0 137.741 6.320 -999.990 -999.990 1.377 ..P WKT 2010 12 05 22 19 55 31.3200 -97.3300 251.000 30.0 142.059 5.830 -999.990 -999.990 1.421 ..P WKT 2010 12 05 22 24 55 31.3200 -97.3300 251.000 122.0 138.443 6.020 -999.990 -999.990 1.384 ..P WKT 2010 12 05 22 29 55 31.3200 -97.3300 251.000 457.0 138.354 6.270 -999.990 -999.990 1.384 ..P WKT 2010 12 05 22 34 55 31.3200 -97.3300 251.000 30.0 140.164 6.990 -999.990 -999.990 1.402 ..P WKT 2010 12 05 22 39 55 31.3200 -97.3300 251.000 122.0 140.075 6.720 -999.990 -999.990 1.401 ..P WKT 2010 12 05 22 44 55 31.3200 -97.3300 251.000 457.0 137.543 6.420 -999.990 -999.990 1.375 ..P WKT 2010 12 05 22 54 55 31.3200 -97.3300 251.000 30.0 128.190 5.910 -999.990 -999.990 1.282 ..P WKT 2010 12 05 22 59 55 31.3200 -97.3300 251.000 122.0 134.947 6.720 -999.990 -999.990 1.349 ..P WKT 2010 12 05 23 04 55 31.3200 -97.3300 251.000 457.0 129.484 7.030 -999.990 -999.990 1.295 ..P WKT 2010 12 05 23 09 55 31.3200 -97.3300 251.000 30.0 140.860 6.600 -999.990 -999.990 1.409 ..P WKT 2010 12 05 23 14 55 31.3200 -97.3300 251.000 122.0 143.273 6.300 -999.990 -999.990 1.433 ..P WKT 2010 12 05 23 19 55 31.3200 -97.3300 251.000 457.0 136.859 6.470 -999.990 -999.990 1.369 ..P WKT 2010 12 05 23 29 55 31.3200 -97.3300 251.000 30.0 148.415 6.410 -999.990 -999.990 1.484 ..P WKT 2010 12 05 23 34 55 31.3200 -97.3300 251.000 122.0 146.010 7.030 -999.990 -999.990 1.460 ..P WKT 2010 12 05 23 39 55 31.3200 -97.3300 251.000 457.0 140.886 6.450 -999.990 -999.990 1.409 ..P WKT 2010 12 05 23 44 55 31.3200 -97.3300 251.000 30.0 147.721 6.740 -999.990 -999.990 1.477 ..P WKT 2010 12 05 23 49 55 31.3200 -97.3300 251.000 122.0 147.762 6.440 -999.990 -999.990 1.478 ..P WKT 2010 12 06 00 09 55 31.3200 -97.3300 251.000 457.0 159.622 6.480 -999.990 -999.990 1.596 ..P WKT 2010 12 06 00 10 25 31.3200 -97.3300 251.000 457.0 156.791 6.980 -999.990 -999.990 1.568 ..P WKT 2010 12 06 00 10 55 31.3200 -97.3300 251.000 457.0 150.834 6.110 -999.990 -999.990 1.508 ..P WKT 2010 12 06 00 11 25 31.3200 -97.3300 251.000 457.0 151.131 6.720 -999.990 -999.990 1.511 ..P WKT 2010 12 06 00 11 55 31.3200 -97.3300 251.000 457.0 161.216 6.350 -999.990 -999.990 1.612 ..P WKT 2010 12 06 00 12 25 31.3200 -97.3300 251.000 457.0 156.347 6.320 -999.990 -999.990 1.563 ..P WKT 2010 12 06 00 12 55 31.3200 -97.3300 251.000 457.0 158.274 6.690 -999.990 -999.990 1.583 ..P WKT 2010 12 06 00 13 25 31.3200 -97.3300 251.000 457.0 159.387 6.350 -999.990 -999.990 1.594 ..P WKT 2010 12 06 00 13 55 31.3200 -97.3300 251.000 457.0 156.829 6.070 -999.990 -999.990 1.568 ..P WKT 2010 12 06 00 14 25 31.3200 -97.3300 251.000 457.0 158.349 6.020 -999.990 -999.990 1.583 ..P WKT 2010 12 06 00 14 55 31.3200 -97.3300 251.000 457.0 159.870 6.170 -999.990 -999.990 1.599 ..P WKT 2010 12 06 00 19 55 31.3200 -97.3300 251.000 30.0 151.688 5.990 -999.990 -999.990 1.517 ..P WKT 2010 12 06 00 24 55 31.3200 -97.3300 251.000 122.0 151.664 5.990 -999.990 -999.990 1.517 ..P WKT 2010 12 06 00 29 55 31.3200 -97.3300 251.000 457.0 163.604 6.200 -999.990 -999.990 1.636 ..P WKT 2010 12 06 00 34 55 31.3200 -97.3300 251.000 30.0 154.199 6.430 -999.990 -999.990 1.542 ..P WKT 2010 12 06 00 39 55 31.3200 -97.3300 251.000 122.0 151.864 5.930 -999.990 -999.990 1.519 ..P WKT 2010 12 06 00 44 55 31.3200 -97.3300 251.000 457.0 163.260 6.790 -999.990 -999.990 1.633 ..P WKT 2010 12 06 00 54 55 31.3200 -97.3300 251.000 30.0 156.596 6.030 -999.990 -999.990 1.566 ..P WKT 2010 12 06 00 59 55 31.3200 -97.3300 251.000 122.0 161.647 7.000 -999.990 -999.990 1.616 ..P WKT 2010 12 06 01 04 55 31.3200 -97.3300 251.000 457.0 165.474 6.080 -999.990 -999.990 1.655 ..P WKT 2010 12 06 01 09 55 31.3200 -97.3300 251.000 30.0 155.572 6.340 -999.990 -999.990 1.556 ..P WKT 2010 12 06 01 14 55 31.3200 -97.3300 251.000 122.0 158.991 6.390 -999.990 -999.990 1.590 ..P WKT 2010 12 06 01 19 55 31.3200 -97.3300 251.000 457.0 168.801 6.300 -999.990 -999.990 1.688 ..P WKT 2010 12 06 01 29 55 31.3200 -97.3300 251.000 30.0 156.938 6.230 -999.990 -999.990 1.569 ..P WKT 2010 12 06 01 34 55 31.3200 -97.3300 251.000 122.0 157.426 5.860 -999.990 -999.990 1.574 ..P WKT 2010 12 06 01 39 55 31.3200 -97.3300 251.000 457.0 160.904 5.830 -999.990 -999.990 1.609 ..P WKT 2010 12 06 01 44 55 31.3200 -97.3300 251.000 30.0 163.838 6.080 -999.990 -999.990 1.638 ..P WKT 2010 12 06 01 49 55 31.3200 -97.3300 251.000 122.0 160.248 6.320 -999.990 -999.990 1.602 ..P WKT 2010 12 06 01 54 55 31.3200 -97.3300 251.000 457.0 170.250 5.620 -999.990 -999.990 1.703 ..P WKT 2010 12 06 02 04 55 31.3200 -97.3300 251.000 30.0 160.738 5.540 -999.990 -999.990 1.607 ..P WKT 2010 12 06 02 09 55 31.3200 -97.3300 251.000 122.0 154.817 5.430 -999.990 -999.990 1.548 ..P WKT 2010 12 06 02 14 55 31.3200 -97.3300 251.000 457.0 162.762 6.380 -999.990 -999.990 1.628 ..P WKT 2010 12 06 02 19 55 31.3200 -97.3300 251.000 30.0 160.919 6.540 -999.990 -999.990 1.609 ..P WKT 2010 12 06 02 24 55 31.3200 -97.3300 251.000 122.0 156.901 5.740 -999.990 -999.990 1.569 ..P WKT 2010 12 06 02 29 55 31.3200 -97.3300 251.000 457.0 173.273 5.760 -999.990 -999.990 1.733 ..P WKT 2010 12 06 02 39 55 31.3200 -97.3300 251.000 30.0 163.761 5.910 -999.990 -999.990 1.638 ..P WKT 2010 12 06 02 44 55 31.3200 -97.3300 251.000 122.0 149.840 5.720 -999.990 -999.990 1.498 ..P WKT 2010 12 06 02 49 55 31.3200 -97.3300 251.000 457.0 165.279 6.000 -999.990 -999.990 1.653 ..P WKT 2010 12 06 02 54 55 31.3200 -97.3300 251.000 30.0 169.029 6.590 -999.990 -999.990 1.690 ..P WKT 2010 12 06 02 59 55 31.3200 -97.3300 251.000 122.0 163.263 5.620 -999.990 -999.990 1.633 ..P WKT 2010 12 06 03 04 55 31.3200 -97.3300 251.000 457.0 159.945 5.430 -999.990 -999.990 1.599 ..P WKT 2010 12 06 03 14 55 31.3200 -97.3300 251.000 30.0 171.657 5.320 -999.990 -999.990 1.717 ..P WKT 2010 12 06 03 19 55 31.3200 -97.3300 251.000 122.0 158.688 6.190 -999.990 -999.990 1.587 ..P WKT 2010 12 06 03 24 55 31.3200 -97.3300 251.000 457.0 170.185 5.480 -999.990 -999.990 1.702 ..P WKT 2010 12 06 03 29 55 31.3200 -97.3300 251.000 30.0 168.905 6.500 -999.990 -999.990 1.689 ..P WKT 2010 12 06 03 34 55 31.3200 -97.3300 251.000 122.0 167.761 5.500 -999.990 -999.990 1.678 ..P WKT 2010 12 06 03 39 55 31.3200 -97.3300 251.000 457.0 158.054 6.650 -999.990 -999.990 1.581 ..P WKT 2010 12 06 03 49 55 31.3200 -97.3300 251.000 30.0 171.456 5.250 -999.990 -999.990 1.715 ..P WKT 2010 12 06 03 54 55 31.3200 -97.3300 251.000 122.0 159.225 5.440 -999.990 -999.990 1.592 ..P WKT 2010 12 06 03 59 55 31.3200 -97.3300 251.000 457.0 161.945 5.620 -999.990 -999.990 1.619 ..P WKT 2010 12 06 04 04 55 31.3200 -97.3300 251.000 30.0 166.976 5.400 -999.990 -999.990 1.670 ..P WKT 2010 12 06 04 09 55 31.3200 -97.3300 251.000 122.0 155.425 5.340 -999.990 -999.990 1.554 ..P WKT 2010 12 06 04 14 55 31.3200 -97.3300 251.000 457.0 153.932 5.320 -999.990 -999.990 1.539 ..P WKT 2010 12 06 04 24 55 31.3200 -97.3300 251.000 30.0 161.857 5.140 -999.990 -999.990 1.619 ..P WKT 2010 12 06 04 29 55 31.3200 -97.3300 251.000 122.0 155.918 5.190 -999.990 -999.990 1.559 ..P WKT 2010 12 06 04 34 55 31.3200 -97.3300 251.000 457.0 161.395 5.360 -999.990 -999.990 1.614 ..P WKT 2010 12 06 04 39 55 31.3200 -97.3300 251.000 30.0 166.872 5.450 -999.990 -999.990 1.669 ..P WKT 2010 12 06 04 44 55 31.3200 -97.3300 251.000 122.0 159.574 5.620 -999.990 -999.990 1.596 ..P WKT 2010 12 06 04 49 55 31.3200 -97.3300 251.000 457.0 155.537 5.260 -999.990 -999.990 1.555 ..P WKT 2010 12 06 05 04 55 31.3200 -97.3300 251.000 30.0 160.615 5.100 -999.990 -999.990 1.606 ..P WKT 2010 12 06 05 09 55 31.3200 -97.3300 251.000 122.0 161.502 5.070 -999.990 -999.990 1.615 ..P WKT 2010 12 06 05 14 55 31.3200 -97.3300 251.000 457.0 136.842 5.760 -999.990 -999.990 1.368 ..P WKT 2010 12 06 05 19 55 31.3200 -97.3300 251.000 30.0 162.463 5.610 -999.990 -999.990 1.625 ..P WKT 2010 12 06 05 24 55 31.3200 -97.3300 251.000 122.0 159.001 5.240 -999.990 -999.990 1.590 ..P WKT 2010 12 06 05 29 55 31.3200 -97.3300 251.000 457.0 143.309 5.310 -999.990 -999.990 1.433 ..P WKT 2010 12 06 05 39 55 31.3200 -97.3300 251.000 30.0 181.337 5.000 -999.990 -999.990 1.813 ..P WKT 2010 12 06 05 44 55 31.3200 -97.3300 251.000 122.0 152.433 4.970 -999.990 -999.990 1.524 ..P WKT 2010 12 06 05 49 55 31.3200 -97.3300 251.000 457.0 136.303 5.540 -999.990 -999.990 1.363 ..P WKT 2010 12 06 05 54 55 31.3200 -97.3300 251.000 30.0 188.116 6.410 -999.990 -999.990 1.881 ..P WKT 2010 12 06 05 59 55 31.3200 -97.3300 251.000 122.0 144.265 5.820 -999.990 -999.990 1.443 ..P WKT 2010 12 06 06 04 55 31.3200 -97.3300 251.000 457.0 130.038 4.850 -999.990 -999.990 1.300 ..P WKT 2010 12 06 06 14 55 31.3200 -97.3300 251.000 30.0 165.140 5.290 -999.990 -999.990 1.651 ..P WKT 2010 12 06 06 19 55 31.3200 -97.3300 251.000 122.0 142.992 5.190 -999.990 -999.990 1.430 ..P WKT 2010 12 06 06 24 55 31.3200 -97.3300 251.000 457.0 133.619 5.620 -999.990 -999.990 1.336 ..P WKT 2010 12 06 06 29 55 31.3200 -97.3300 251.000 30.0 161.476 5.070 -999.990 -999.990 1.615 ..P WKT 2010 12 06 06 34 55 31.3200 -97.3300 251.000 122.0 159.168 4.480 -999.990 -999.990 1.592 ..P WKT 2010 12 06 06 39 55 31.3200 -97.3300 251.000 457.0 135.120 4.350 -999.990 -999.990 1.351 ..P WKT 2010 12 06 06 49 55 31.3200 -97.3300 251.000 30.0 177.089 5.650 -999.990 -999.990 1.771 ..P WKT 2010 12 06 06 54 55 31.3200 -97.3300 251.000 122.0 171.908 4.530 -999.990 -999.990 1.719 ..P WKT 2010 12 06 06 59 55 31.3200 -97.3300 251.000 457.0 134.934 4.700 -999.990 -999.990 1.349 ..P WKT 2010 12 06 07 04 55 31.3200 -97.3300 251.000 30.0 167.253 4.930 -999.990 -999.990 1.673 ..P WKT 2010 12 06 07 09 55 31.3200 -97.3300 251.000 122.0 181.909 4.640 -999.990 -999.990 1.819 ..P WKT 2010 12 06 07 14 55 31.3200 -97.3300 251.000 457.0 128.495 4.940 -999.990 -999.990 1.285 ..P WKT 2010 12 06 07 24 55 31.3200 -97.3300 251.000 30.0 176.013 5.020 -999.990 -999.990 1.760 ..P WKT 2010 12 06 07 29 55 31.3200 -97.3300 251.000 122.0 180.072 4.970 -999.990 -999.990 1.801 ..P WKT 2010 12 06 07 34 55 31.3200 -97.3300 251.000 457.0 136.170 4.890 -999.990 -999.990 1.362 ..P WKT 2010 12 06 07 39 55 31.3200 -97.3300 251.000 30.0 181.666 4.360 -999.990 -999.990 1.817 ..P WKT 2010 12 06 07 44 55 31.3200 -97.3300 251.000 122.0 176.485 4.480 -999.990 -999.990 1.765 ..P WKT 2010 12 06 07 49 55 31.3200 -97.3300 251.000 457.0 144.813 6.050 -999.990 -999.990 1.448 ..P WKT 2010 12 06 07 59 55 31.3200 -97.3300 251.000 30.0 183.497 4.330 -999.990 -999.990 1.835 ..P WKT 2010 12 06 08 04 55 31.3200 -97.3300 251.000 122.0 180.626 4.910 -999.990 -999.990 1.806 ..P WKT 2010 12 06 08 09 55 31.3200 -97.3300 251.000 457.0 136.320 4.290 -999.990 -999.990 1.363 ..P WKT 2010 12 06 08 14 55 31.3200 -97.3300 251.000 30.0 180.319 4.710 -999.990 -999.990 1.803 ..P WKT 2010 12 06 08 19 55 31.3200 -97.3300 251.000 122.0 182.203 4.840 -999.990 -999.990 1.822 ..P WKT 2010 12 06 08 24 55 31.3200 -97.3300 251.000 457.0 133.960 5.400 -999.990 -999.990 1.340 ..P WKT 2010 12 06 08 34 55 31.3200 -97.3300 251.000 30.0 182.189 5.630 -999.990 -999.990 1.822 ..P WKT 2010 12 06 08 39 55 31.3200 -97.3300 251.000 122.0 192.941 5.370 -999.990 -999.990 1.929 ..P WKT 2010 12 06 08 44 55 31.3200 -97.3300 251.000 457.0 133.735 5.810 -999.990 -999.990 1.337 ..P WKT 2010 12 06 08 49 55 31.3200 -97.3300 251.000 30.0 185.240 5.030 -999.990 -999.990 1.852 ..P WKT 2010 12 06 08 54 55 31.3200 -97.3300 251.000 122.0 174.394 5.550 -999.990 -999.990 1.744 ..P WKT 2010 12 06 08 59 55 31.3200 -97.3300 251.000 457.0 137.467 3.870 -999.990 -999.990 1.375 ..P WKT 2010 12 06 09 09 55 31.3200 -97.3300 251.000 30.0 192.348 4.940 -999.990 -999.990 1.923 ..P WKT 2010 12 06 09 14 55 31.3200 -97.3300 251.000 122.0 172.770 5.120 -999.990 -999.990 1.728 ..P WKT 2010 12 06 09 19 55 31.3200 -97.3300 251.000 457.0 132.546 4.860 -999.990 -999.990 1.325 ..P WKT 2010 12 06 09 24 55 31.3200 -97.3300 251.000 30.0 197.455 4.810 -999.990 -999.990 1.975 ..P WKT 2010 12 06 09 29 55 31.3200 -97.3300 251.000 122.0 168.098 4.570 -999.990 -999.990 1.681 ..P WKT 2010 12 06 09 34 55 31.3200 -97.3300 251.000 457.0 131.679 6.430 -999.990 -999.990 1.317 ..P WKT 2010 12 06 09 44 55 31.3200 -97.3300 251.000 30.0 194.667 4.770 -999.990 -999.990 1.947 ..P WKT 2010 12 06 09 49 55 31.3200 -97.3300 251.000 122.0 170.473 4.620 -999.990 -999.990 1.705 ..P WKT 2010 12 06 09 54 55 31.3200 -97.3300 251.000 457.0 130.524 4.330 -999.990 -999.990 1.305 ..P WKT 2010 12 06 09 59 55 31.3200 -97.3300 251.000 30.0 200.589 4.850 -999.990 -999.990 2.006 ..P WKT 2010 12 06 10 04 55 31.3200 -97.3300 251.000 122.0 168.518 4.450 -999.990 -999.990 1.685 ..P WKT 2010 12 06 10 09 55 31.3200 -97.3300 251.000 457.0 129.385 4.010 -999.990 -999.990 1.294 ..P WKT 2010 12 06 10 19 55 31.3200 -97.3300 251.000 30.0 206.531 4.270 -999.990 -999.990 2.065 ..P WKT 2010 12 06 10 24 55 31.3200 -97.3300 251.000 122.0 172.871 4.360 -999.990 -999.990 1.729 ..P WKT 2010 12 06 10 29 55 31.3200 -97.3300 251.000 457.0 131.606 3.700 -999.990 -999.990 1.316 ..P WKT 2010 12 06 10 34 55 31.3200 -97.3300 251.000 30.0 205.235 4.630 -999.990 -999.990 2.052 ..P WKT 2010 12 06 10 39 55 31.3200 -97.3300 251.000 122.0 179.181 4.370 -999.990 -999.990 1.792 ..P WKT 2010 12 06 10 44 55 31.3200 -97.3300 251.000 457.0 130.312 3.400 -999.990 -999.990 1.303 ..P WKT 2010 12 06 10 54 55 31.3200 -97.3300 251.000 30.0 206.870 4.620 -999.990 -999.990 2.069 ..P WKT 2010 12 06 10 59 55 31.3200 -97.3300 251.000 122.0 174.764 3.730 -999.990 -999.990 1.748 ..P WKT 2010 12 06 11 04 55 31.3200 -97.3300 251.000 457.0 140.487 3.590 -999.990 -999.990 1.405 ..P WKT 2010 12 06 11 09 55 31.3200 -97.3300 251.000 30.0 203.983 5.370 -999.990 -999.990 2.040 ..P WKT 2010 12 06 11 14 55 31.3200 -97.3300 251.000 122.0 174.594 4.760 -999.990 -999.990 1.746 ..P WKT 2010 12 06 11 19 55 31.3200 -97.3300 251.000 457.0 133.935 4.310 -999.990 -999.990 1.339 ..P WKT 2010 12 06 11 29 55 31.3200 -97.3300 251.000 30.0 191.696 3.960 -999.990 -999.990 1.917 ..P WKT 2010 12 06 11 34 55 31.3200 -97.3300 251.000 122.0 161.522 4.180 -999.990 -999.990 1.615 ..P WKT 2010 12 06 11 39 55 31.3200 -97.3300 251.000 457.0 135.964 3.520 -999.990 -999.990 1.360 ..P WKT 2010 12 06 11 44 55 31.3200 -97.3300 251.000 30.0 198.938 3.480 -999.990 -999.990 1.989 ..P WKT 2010 12 06 11 49 55 31.3200 -97.3300 251.000 122.0 163.469 4.140 -999.990 -999.990 1.635 ..P WKT 2010 12 06 12 09 55 31.3200 -97.3300 251.000 457.0 134.065 3.180 -999.990 -999.990 1.341 ..P WKT 2010 12 06 12 10 25 31.3200 -97.3300 251.000 457.0 130.907 3.570 -999.990 -999.990 1.309 ..P WKT 2010 12 06 12 10 55 31.3200 -97.3300 251.000 457.0 134.675 4.110 -999.990 -999.990 1.347 ..P WKT 2010 12 06 12 11 25 31.3200 -97.3300 251.000 457.0 129.617 4.080 -999.990 -999.990 1.296 ..P WKT 2010 12 06 12 11 55 31.3200 -97.3300 251.000 457.0 133.520 4.130 -999.990 -999.990 1.335 ..P WKT 2010 12 06 12 12 25 31.3200 -97.3300 251.000 457.0 133.757 3.370 -999.990 -999.990 1.338 ..P WKT 2010 12 06 12 12 55 31.3200 -97.3300 251.000 457.0 138.067 3.660 -999.990 -999.990 1.381 ..P WKT 2010 12 06 12 13 25 31.3200 -97.3300 251.000 457.0 138.847 2.890 -999.990 -999.990 1.388 ..P WKT 2010 12 06 12 13 55 31.3200 -97.3300 251.000 457.0 140.442 3.080 -999.990 -999.990 1.404 ..P WKT 2010 12 06 12 14 25 31.3200 -97.3300 251.000 457.0 134.571 3.430 -999.990 -999.990 1.346 ..P WKT 2010 12 06 12 14 55 31.3200 -97.3300 251.000 457.0 134.808 3.920 -999.990 -999.990 1.348 ..P WKT 2010 12 06 12 19 55 31.3200 -97.3300 251.000 30.0 196.085 3.670 -999.990 -999.990 1.961 ..P WKT 2010 12 06 12 24 55 31.3200 -97.3300 251.000 122.0 161.130 3.770 -999.990 -999.990 1.611 ..P WKT 2010 12 06 12 29 55 31.3200 -97.3300 251.000 457.0 129.574 3.700 -999.990 -999.990 1.296 ..P WKT 2010 12 06 12 34 55 31.3200 -97.3300 251.000 30.0 188.390 3.540 -999.990 -999.990 1.884 ..P WKT 2010 12 06 12 39 55 31.3200 -97.3300 251.000 122.0 165.793 3.290 -999.990 -999.990 1.658 ..P WKT 2010 12 06 12 44 55 31.3200 -97.3300 251.000 457.0 136.960 3.370 -999.990 -999.990 1.370 ..P WKT 2010 12 06 12 54 55 31.3200 -97.3300 251.000 30.0 187.543 3.540 -999.990 -999.990 1.875 ..P WKT 2010 12 06 12 59 55 31.3200 -97.3300 251.000 122.0 154.244 3.360 -999.990 -999.990 1.542 ..P WKT 2010 12 06 13 04 55 31.3200 -97.3300 251.000 457.0 128.545 4.130 -999.990 -999.990 1.285 ..P WKT 2010 12 06 13 09 55 31.3200 -97.3300 251.000 30.0 181.354 3.730 -999.990 -999.990 1.814 ..P WKT 2010 12 06 13 14 55 31.3200 -97.3300 251.000 122.0 154.709 3.720 -999.990 -999.990 1.547 ..P WKT 2010 12 06 13 19 55 31.3200 -97.3300 251.000 457.0 134.847 3.660 -999.990 -999.990 1.348 ..P WKT 2010 12 06 13 29 55 31.3200 -97.3300 251.000 30.0 184.796 4.100 -999.990 -999.990 1.848 ..P WKT 2010 12 06 13 34 55 31.3200 -97.3300 251.000 122.0 158.916 4.430 -999.990 -999.990 1.589 ..P WKT 2010 12 06 13 39 55 31.3200 -97.3300 251.000 457.0 133.856 3.770 -999.990 -999.990 1.339 ..P WKT 2010 12 06 13 44 55 31.3200 -97.3300 251.000 30.0 181.690 3.960 -999.990 -999.990 1.817 ..P WKT 2010 12 06 13 49 55 31.3200 -97.3300 251.000 122.0 157.987 4.370 -999.990 -999.990 1.580 ..P WKT 2010 12 06 13 54 55 31.3200 -97.3300 251.000 457.0 133.476 4.880 -999.990 -999.990 1.335 ..P WKT 2010 12 06 14 04 55 31.3200 -97.3300 251.000 30.0 185.883 4.470 -999.990 -999.990 1.859 ..P WKT 2010 12 06 14 09 55 31.3200 -97.3300 251.000 122.0 150.119 4.040 -999.990 -999.990 1.501 ..P WKT 2010 12 06 14 14 55 31.3200 -97.3300 251.000 457.0 137.920 4.010 -999.990 -999.990 1.379 ..P WKT 2010 12 06 14 19 55 31.3200 -97.3300 251.000 30.0 179.066 4.200 -999.990 -999.990 1.791 ..P WKT 2010 12 06 14 24 55 31.3200 -97.3300 251.000 122.0 152.789 3.560 -999.990 -999.990 1.528 ..P WKT 2010 12 06 14 29 55 31.3200 -97.3300 251.000 457.0 141.677 3.640 -999.990 -999.990 1.417 ..P WKT 2010 12 06 14 39 55 31.3200 -97.3300 251.000 30.0 172.857 3.670 -999.990 -999.990 1.729 ..P WKT 2010 12 06 14 44 55 31.3200 -97.3300 251.000 122.0 163.989 4.010 -999.990 -999.990 1.640 ..P WKT 2010 12 06 14 49 55 31.3200 -97.3300 251.000 457.0 126.981 4.040 -999.990 -999.990 1.270 ..P WKT 2010 12 06 14 54 55 31.3200 -97.3300 251.000 30.0 165.469 4.660 -999.990 -999.990 1.655 ..P WKT 2010 12 06 14 59 55 31.3200 -97.3300 251.000 122.0 161.744 5.120 -999.990 -999.990 1.617 ..P WKT 2010 12 06 15 04 55 31.3200 -97.3300 251.000 457.0 130.429 5.260 -999.990 -999.990 1.304 ..P WKT 2010 12 06 15 14 55 31.3200 -97.3300 251.000 30.0 170.996 5.660 -999.990 -999.990 1.710 ..P WKT 2010 12 06 15 19 55 31.3200 -97.3300 251.000 122.0 164.974 4.730 -999.990 -999.990 1.650 ..P WKT 2010 12 06 15 24 55 31.3200 -97.3300 251.000 457.0 142.730 4.370 -999.990 -999.990 1.427 ..P WKT 2010 12 06 15 29 55 31.3200 -97.3300 251.000 30.0 168.751 4.270 -999.990 -999.990 1.688 ..P WKT 2010 12 06 15 34 55 31.3200 -97.3300 251.000 122.0 175.302 4.450 -999.990 -999.990 1.753 ..P WKT 2010 12 06 15 39 55 31.3200 -97.3300 251.000 457.0 136.574 3.830 -999.990 -999.990 1.366 ..P WKT 2010 12 06 15 49 55 31.3200 -97.3300 251.000 30.0 166.203 3.820 -999.990 -999.990 1.662 ..P WKT 2010 12 06 15 54 55 31.3200 -97.3300 251.000 122.0 169.413 3.370 -999.990 -999.990 1.694 ..P WKT 2010 12 06 15 59 55 31.3200 -97.3300 251.000 457.0 136.415 3.340 -999.990 -999.990 1.364 ..P WKT 2010 12 06 16 04 55 31.3200 -97.3300 251.000 30.0 169.075 4.000 -999.990 -999.990 1.691 ..P WKT 2010 12 06 16 09 55 31.3200 -97.3300 251.000 122.0 165.260 3.720 -999.990 -999.990 1.653 ..P WKT 2010 12 06 16 14 55 31.3200 -97.3300 251.000 457.0 123.359 4.030 -999.990 -999.990 1.234 ..P WKT 2010 12 06 16 24 55 31.3200 -97.3300 251.000 30.0 160.396 3.580 -999.990 -999.990 1.604 ..P WKT 2010 12 06 16 29 55 31.3200 -97.3300 251.000 122.0 153.574 4.280 -999.990 -999.990 1.536 ..P WKT 2010 12 06 16 34 55 31.3200 -97.3300 251.000 457.0 122.453 3.420 -999.990 -999.990 1.225 ..P WKT 2010 12 06 16 39 55 31.3200 -97.3300 251.000 30.0 156.538 3.320 -999.990 -999.990 1.565 ..P WKT 2010 12 06 16 44 55 31.3200 -97.3300 251.000 122.0 161.461 4.690 -999.990 -999.990 1.615 ..P WKT 2010 12 06 16 49 55 31.3200 -97.3300 251.000 457.0 124.681 3.310 -999.990 -999.990 1.247 ..P WKT 2010 12 06 17 04 55 31.3200 -97.3300 251.000 30.0 153.736 3.660 -999.990 -999.990 1.537 ..P WKT 2010 12 06 17 09 55 31.3200 -97.3300 251.000 122.0 155.814 3.300 -999.990 -999.990 1.558 ..P WKT 2010 12 06 17 14 55 31.3200 -97.3300 251.000 457.0 131.589 3.320 -999.990 -999.990 1.316 ..P WKT 2010 12 06 17 19 55 31.3200 -97.3300 251.000 30.0 155.113 3.720 -999.990 -999.990 1.551 ..P WKT 2010 12 06 17 24 55 31.3200 -97.3300 251.000 122.0 145.189 4.220 -999.990 -999.990 1.452 ..P WKT 2010 12 06 17 29 55 31.3200 -97.3300 251.000 457.0 144.166 3.370 -999.990 -999.990 1.442 ..P WKT 2010 12 06 17 39 55 31.3200 -97.3300 251.000 30.0 155.265 3.190 -999.990 -999.990 1.553 ..P WKT 2010 12 06 17 44 55 31.3200 -97.3300 251.000 122.0 156.330 3.930 -999.990 -999.990 1.563 ..P WKT 2010 12 06 17 49 55 31.3200 -97.3300 251.000 457.0 148.500 4.220 -999.990 -999.990 1.485 ..P WKT 2010 12 06 17 54 55 31.3200 -97.3300 251.000 30.0 153.609 3.170 -999.990 -999.990 1.536 ..P WKT 2010 12 06 17 59 55 31.3200 -97.3300 251.000 122.0 146.858 5.440 -999.990 -999.990 1.469 ..P WKT 2010 12 06 18 04 55 31.3200 -97.3300 251.000 457.0 140.918 3.650 -999.990 -999.990 1.409 ..P WKT 2010 12 06 18 14 55 31.3200 -97.3300 251.000 30.0 144.706 3.540 -999.990 -999.990 1.447 ..P WKT 2010 12 06 18 19 55 31.3200 -97.3300 251.000 122.0 145.810 3.080 -999.990 -999.990 1.458 ..P WKT 2010 12 06 18 24 55 31.3200 -97.3300 251.000 457.0 149.877 4.400 -999.990 -999.990 1.499 ..P WKT 2010 12 06 18 29 55 31.3200 -97.3300 251.000 30.0 150.443 3.130 -999.990 -999.990 1.504 ..P WKT 2010 12 06 18 34 55 31.3200 -97.3300 251.000 122.0 143.196 3.050 -999.990 -999.990 1.432 ..P WKT 2010 12 06 18 39 55 31.3200 -97.3300 251.000 457.0 143.493 4.050 -999.990 -999.990 1.435 ..P WKT 2010 12 06 18 49 55 31.3200 -97.3300 251.000 30.0 139.816 3.610 -999.990 -999.990 1.398 ..P WKT 2010 12 06 18 54 55 31.3200 -97.3300 251.000 122.0 138.535 4.670 -999.990 -999.990 1.385 ..P WKT 2010 12 06 18 59 55 31.3200 -97.3300 251.000 457.0 136.313 3.020 -999.990 -999.990 1.363 ..P WKT 2010 12 06 19 04 55 31.3200 -97.3300 251.000 30.0 141.762 3.170 -999.990 -999.990 1.418 ..P WKT 2010 12 06 19 09 55 31.3200 -97.3300 251.000 122.0 137.926 4.060 -999.990 -999.990 1.379 ..P WKT 2010 12 06 19 14 55 31.3200 -97.3300 251.000 457.0 133.956 2.700 -999.990 -999.990 1.340 ..P WKT 2010 12 06 19 24 55 31.3200 -97.3300 251.000 30.0 139.757 3.160 -999.990 -999.990 1.398 ..P WKT 2010 12 06 19 29 55 31.3200 -97.3300 251.000 122.0 137.959 2.750 -999.990 -999.990 1.380 ..P WKT 2010 12 06 19 34 55 31.3200 -97.3300 251.000 457.0 140.330 3.300 -999.990 -999.990 1.403 ..P WKT 2010 12 06 19 39 55 31.3200 -97.3300 251.000 30.0 137.053 3.480 -999.990 -999.990 1.371 ..P WKT 2010 12 06 19 44 55 31.3200 -97.3300 251.000 122.0 136.332 3.020 -999.990 -999.990 1.363 ..P WKT 2010 12 06 19 49 55 31.3200 -97.3300 251.000 457.0 134.803 2.930 -999.990 -999.990 1.348 ..P WKT 2010 12 06 19 59 55 31.3200 -97.3300 251.000 30.0 132.919 3.150 -999.990 -999.990 1.329 ..P WKT 2010 12 06 20 04 55 31.3200 -97.3300 251.000 122.0 138.477 3.010 -999.990 -999.990 1.385 ..P WKT 2010 12 06 20 09 55 31.3200 -97.3300 251.000 457.0 124.950 2.720 -999.990 -999.990 1.250 ..P WKT 2010 12 06 20 14 55 31.3200 -97.3300 251.000 30.0 140.720 3.290 -999.990 -999.990 1.407 ..P WKT 2010 12 06 20 19 55 31.3200 -97.3300 251.000 122.0 145.201 3.100 -999.990 -999.990 1.452 ..P WKT 2010 12 06 20 24 55 31.3200 -97.3300 251.000 457.0 139.469 4.360 -999.990 -999.990 1.395 ..P WKT 2010 12 06 20 34 55 31.3200 -97.3300 251.000 30.0 134.304 2.570 -999.990 -999.990 1.343 ..P WKT 2010 12 06 20 39 55 31.3200 -97.3300 251.000 122.0 136.079 3.180 -999.990 -999.990 1.361 ..P WKT 2010 12 06 20 44 55 31.3200 -97.3300 251.000 457.0 135.300 3.010 -999.990 -999.990 1.353 ..P WKT 2010 12 06 20 49 55 31.3200 -97.3300 251.000 30.0 137.342 3.040 -999.990 -999.990 1.373 ..P WKT 2010 12 06 20 54 55 31.3200 -97.3300 251.000 122.0 136.967 2.920 -999.990 -999.990 1.370 ..P WKT 2010 12 06 20 59 55 31.3200 -97.3300 251.000 457.0 140.619 2.990 -999.990 -999.990 1.406 ..P WKT 2010 12 06 21 09 55 31.3200 -97.3300 251.000 30.0 134.518 3.270 -999.990 -999.990 1.345 ..P WKT 2010 12 06 21 14 55 31.3200 -97.3300 251.000 122.0 141.410 4.040 -999.990 -999.990 1.414 ..P WKT 2010 12 06 21 19 55 31.3200 -97.3300 251.000 457.0 133.271 3.250 -999.990 -999.990 1.333 ..P WKT 2010 12 06 21 24 55 31.3200 -97.3300 251.000 30.0 131.573 3.060 -999.990 -999.990 1.316 ..P WKT 2010 12 06 21 29 55 31.3200 -97.3300 251.000 122.0 137.657 3.680 -999.990 -999.990 1.377 ..P WKT 2010 12 06 21 34 55 31.3200 -97.3300 251.000 457.0 135.424 2.520 -999.990 -999.990 1.354 ..P WKT 2010 12 06 21 44 55 31.3200 -97.3300 251.000 30.0 141.227 2.550 -999.990 -999.990 1.412 ..P WKT 2010 12 06 21 49 55 31.3200 -97.3300 251.000 122.0 131.560 4.150 -999.990 -999.990 1.316 ..P WKT 2010 12 06 21 54 55 31.3200 -97.3300 251.000 457.0 134.231 2.770 -999.990 -999.990 1.342 ..P WKT 2010 12 06 21 59 55 31.3200 -97.3300 251.000 30.0 133.148 2.930 -999.990 -999.990 1.331 ..P WKT 2010 12 06 22 04 55 31.3200 -97.3300 251.000 122.0 122.144 2.860 -999.990 -999.990 1.221 ..P WKT 2010 12 06 22 09 55 31.3200 -97.3300 251.000 457.0 127.765 2.890 -999.990 -999.990 1.278 ..P WKT 2010 12 06 22 19 55 31.3200 -97.3300 251.000 30.0 132.322 3.090 -999.990 -999.990 1.323 ..P WKT 2010 12 06 22 24 55 31.3200 -97.3300 251.000 122.0 133.938 2.830 -999.990 -999.990 1.339 ..P WKT 2010 12 06 22 29 55 31.3200 -97.3300 251.000 457.0 136.091 2.890 -999.990 -999.990 1.361 ..P WKT 2010 12 06 22 34 55 31.3200 -97.3300 251.000 30.0 139.583 3.430 -999.990 -999.990 1.396 ..P WKT 2010 12 06 22 39 55 31.3200 -97.3300 251.000 122.0 138.520 3.230 -999.990 -999.990 1.385 ..P WKT 2010 12 06 22 44 55 31.3200 -97.3300 251.000 457.0 137.858 3.200 -999.990 -999.990 1.379 ..P WKT 2010 12 06 22 54 55 31.3200 -97.3300 251.000 30.0 138.429 3.110 -999.990 -999.990 1.384 ..P WKT 2010 12 06 22 59 55 31.3200 -97.3300 251.000 122.0 136.581 3.630 -999.990 -999.990 1.366 ..P WKT 2010 12 06 23 04 55 31.3200 -97.3300 251.000 457.0 134.332 4.070 -999.990 -999.990 1.343 ..P WKT 2010 12 06 23 09 55 31.3200 -97.3300 251.000 30.0 131.950 3.870 -999.990 -999.990 1.319 ..P WKT 2010 12 06 23 14 55 31.3200 -97.3300 251.000 122.0 131.041 4.300 -999.990 -999.990 1.310 ..P WKT 2010 12 06 23 19 55 31.3200 -97.3300 251.000 457.0 136.423 4.040 -999.990 -999.990 1.364 ..P WKT 2010 12 06 23 29 55 31.3200 -97.3300 251.000 30.0 134.165 4.240 -999.990 -999.990 1.342 ..P WKT 2010 12 06 23 34 55 31.3200 -97.3300 251.000 122.0 132.817 3.530 -999.990 -999.990 1.328 ..P WKT 2010 12 06 23 39 55 31.3200 -97.3300 251.000 457.0 130.933 3.820 -999.990 -999.990 1.309 ..P WKT 2010 12 06 23 44 55 31.3200 -97.3300 251.000 30.0 133.732 3.750 -999.990 -999.990 1.337 ..P WKT 2010 12 06 23 49 55 31.3200 -97.3300 251.000 122.0 131.983 3.270 -999.990 -999.990 1.320 ..P WKT 2010 12 07 00 09 55 31.3200 -97.3300 251.000 457.0 133.211 2.820 -999.990 -999.990 1.332 ..P WKT 2010 12 07 00 10 25 31.3200 -97.3300 251.000 457.0 132.107 3.240 -999.990 -999.990 1.321 ..P WKT 2010 12 07 00 10 55 31.3200 -97.3300 251.000 457.0 132.474 3.040 -999.990 -999.990 1.325 ..P WKT 2010 12 07 00 11 25 31.3200 -97.3300 251.000 457.0 131.906 2.860 -999.990 -999.990 1.319 ..P WKT 2010 12 07 00 11 55 31.3200 -97.3300 251.000 457.0 136.152 3.140 -999.990 -999.990 1.362 ..P WKT 2010 12 07 00 12 25 31.3200 -97.3300 251.000 457.0 132.373 3.560 -999.990 -999.990 1.324 ..P WKT 2010 12 07 00 12 55 31.3200 -97.3300 251.000 457.0 125.385 3.320 -999.990 -999.990 1.254 ..P WKT 2010 12 07 00 13 25 31.3200 -97.3300 251.000 457.0 132.841 3.520 -999.990 -999.990 1.328 ..P WKT 2010 12 07 00 13 55 31.3200 -97.3300 251.000 457.0 134.145 3.160 -999.990 -999.990 1.341 ..P WKT 2010 12 07 00 14 25 31.3200 -97.3300 251.000 457.0 130.901 2.860 -999.990 -999.990 1.309 ..P WKT 2010 12 07 00 14 55 31.3200 -97.3300 251.000 457.0 129.931 4.140 -999.990 -999.990 1.299 ..P WKT 2010 12 07 00 19 55 31.3200 -97.3300 251.000 30.0 134.810 3.850 -999.990 -999.990 1.348 ..P WKT 2010 12 07 00 24 55 31.3200 -97.3300 251.000 122.0 135.677 4.750 -999.990 -999.990 1.357 ..P WKT 2010 12 07 00 29 55 31.3200 -97.3300 251.000 457.0 134.939 3.990 -999.990 -999.990 1.349 ..P WKT 2010 12 07 00 34 55 31.3200 -97.3300 251.000 30.0 140.086 2.990 -999.990 -999.990 1.401 ..P WKT 2010 12 07 00 39 55 31.3200 -97.3300 251.000 122.0 135.202 4.120 -999.990 -999.990 1.352 ..P WKT 2010 12 07 00 44 55 31.3200 -97.3300 251.000 457.0 136.871 2.840 -999.990 -999.990 1.369 ..P WKT 2010 12 07 00 54 55 31.3200 -97.3300 251.000 30.0 138.932 3.120 -999.990 -999.990 1.389 ..P WKT 2010 12 07 00 59 55 31.3200 -97.3300 251.000 122.0 138.119 2.770 -999.990 -999.990 1.381 ..P WKT 2010 12 07 01 04 55 31.3200 -97.3300 251.000 457.0 136.236 3.350 -999.990 -999.990 1.362 ..P WKT 2010 12 07 01 09 55 31.3200 -97.3300 251.000 30.0 130.340 3.350 -999.990 -999.990 1.303 ..P WKT 2010 12 07 01 14 55 31.3200 -97.3300 251.000 122.0 135.146 3.290 -999.990 -999.990 1.351 ..P WKT 2010 12 07 01 19 55 31.3200 -97.3300 251.000 457.0 134.333 3.960 -999.990 -999.990 1.343 ..P WKT 2010 12 07 01 29 55 31.3200 -97.3300 251.000 30.0 139.779 4.000 -999.990 -999.990 1.398 ..P WKT 2010 12 07 01 34 55 31.3200 -97.3300 251.000 122.0 135.335 3.360 -999.990 -999.990 1.353 ..P WKT 2010 12 07 01 39 55 31.3200 -97.3300 251.000 457.0 138.116 3.900 -999.990 -999.990 1.381 ..P WKT 2010 12 07 01 44 55 31.3200 -97.3300 251.000 30.0 135.812 4.040 -999.990 -999.990 1.358 ..P WKT 2010 12 07 01 49 55 31.3200 -97.3300 251.000 122.0 134.847 3.010 -999.990 -999.990 1.348 ..P WKT 2010 12 07 01 54 55 31.3200 -97.3300 251.000 457.0 138.430 3.360 -999.990 -999.990 1.384 ..P WKT 2010 12 07 02 04 55 31.3200 -97.3300 251.000 30.0 141.010 4.400 -999.990 -999.990 1.410 ..P WKT 2010 12 07 02 09 55 31.3200 -97.3300 251.000 122.0 141.345 3.180 -999.990 -999.990 1.413 ..P WKT 2010 12 07 02 14 55 31.3200 -97.3300 251.000 457.0 133.917 3.700 -999.990 -999.990 1.339 ..P WKT 2010 12 07 02 19 55 31.3200 -97.3300 251.000 30.0 138.266 3.510 -999.990 -999.990 1.383 ..P WKT 2010 12 07 02 24 55 31.3200 -97.3300 251.000 122.0 130.303 4.570 -999.990 -999.990 1.303 ..P WKT 2010 12 07 02 29 55 31.3200 -97.3300 251.000 457.0 133.849 4.320 -999.990 -999.990 1.338 ..P WKT 2010 12 07 02 39 55 31.3200 -97.3300 251.000 30.0 144.554 4.490 -999.990 -999.990 1.446 ..P WKT 2010 12 07 02 44 55 31.3200 -97.3300 251.000 122.0 161.351 4.840 -999.990 -999.990 1.614 ..P WKT 2010 12 07 02 49 55 31.3200 -97.3300 251.000 457.0 138.263 4.490 -999.990 -999.990 1.383 ..P WKT 2010 12 07 02 54 55 31.3200 -97.3300 251.000 30.0 141.141 4.750 -999.990 -999.990 1.411 ..P WKT 2010 12 07 02 59 55 31.3200 -97.3300 251.000 122.0 144.152 4.820 -999.990 -999.990 1.442 ..P WKT 2010 12 07 03 04 55 31.3200 -97.3300 251.000 457.0 137.660 4.760 -999.990 -999.990 1.377 ..P WKT 2010 12 07 03 14 55 31.3200 -97.3300 251.000 30.0 136.474 4.910 -999.990 -999.990 1.365 ..P WKT 2010 12 07 03 19 55 31.3200 -97.3300 251.000 122.0 136.292 4.130 -999.990 -999.990 1.363 ..P WKT 2010 12 07 03 24 55 31.3200 -97.3300 251.000 457.0 131.693 3.920 -999.990 -999.990 1.317 ..P WKT 2010 12 07 03 29 55 31.3200 -97.3300 251.000 30.0 129.904 3.960 -999.990 -999.990 1.299 ..P WKT 2010 12 07 03 34 55 31.3200 -97.3300 251.000 122.0 142.573 4.120 -999.990 -999.990 1.426 ..P WKT 2010 12 07 03 39 55 31.3200 -97.3300 251.000 457.0 129.138 3.670 -999.990 -999.990 1.291 ..P WKT 2010 12 07 03 49 55 31.3200 -97.3300 251.000 30.0 132.234 3.240 -999.990 -999.990 1.322 ..P WKT 2010 12 07 03 54 55 31.3200 -97.3300 251.000 122.0 139.798 3.190 -999.990 -999.990 1.398 ..P WKT 2010 12 07 03 59 55 31.3200 -97.3300 251.000 457.0 135.447 3.770 -999.990 -999.990 1.354 ..P WKT 2010 12 07 04 04 55 31.3200 -97.3300 251.000 30.0 141.002 3.900 -999.990 -999.990 1.410 ..P WKT 2010 12 07 04 09 55 31.3200 -97.3300 251.000 122.0 134.910 3.480 -999.990 -999.990 1.349 ..P WKT 2010 12 07 04 14 55 31.3200 -97.3300 251.000 457.0 130.692 3.340 -999.990 -999.990 1.307 ..P WKT 2010 12 07 04 24 55 31.3200 -97.3300 251.000 30.0 137.501 3.570 -999.990 -999.990 1.375 ..P WKT 2010 12 07 04 29 55 31.3200 -97.3300 251.000 122.0 139.958 3.980 -999.990 -999.990 1.400 ..P WKT 2010 12 07 04 34 55 31.3200 -97.3300 251.000 457.0 134.114 3.990 -999.990 -999.990 1.341 ..P WKT 2010 12 07 04 39 55 31.3200 -97.3300 251.000 30.0 142.597 3.880 -999.990 -999.990 1.426 ..P WKT 2010 12 07 04 44 55 31.3200 -97.3300 251.000 122.0 134.610 4.360 -999.990 -999.990 1.346 ..P WKT 2010 12 07 04 49 55 31.3200 -97.3300 251.000 457.0 130.641 3.990 -999.990 -999.990 1.306 ..P WKT 2010 12 07 05 04 55 31.3200 -97.3300 251.000 30.0 138.301 3.860 -999.990 -999.990 1.383 ..P WKT 2010 12 07 05 09 55 31.3200 -97.3300 251.000 122.0 127.912 3.640 -999.990 -999.990 1.279 ..P WKT 2010 12 07 05 14 55 31.3200 -97.3300 251.000 457.0 127.969 4.830 -999.990 -999.990 1.280 ..P WKT 2010 12 07 05 19 55 31.3200 -97.3300 251.000 30.0 131.240 3.400 -999.990 -999.990 1.312 ..P WKT 2010 12 07 05 24 55 31.3200 -97.3300 251.000 122.0 137.458 3.470 -999.990 -999.990 1.375 ..P WKT 2010 12 07 05 29 55 31.3200 -97.3300 251.000 457.0 134.033 3.380 -999.990 -999.990 1.340 ..P WKT 2010 12 07 05 39 55 31.3200 -97.3300 251.000 30.0 140.125 3.580 -999.990 -999.990 1.401 ..P WKT 2010 12 07 05 44 55 31.3200 -97.3300 251.000 122.0 128.483 4.210 -999.990 -999.990 1.285 ..P WKT 2010 12 07 05 49 55 31.3200 -97.3300 251.000 457.0 130.233 3.820 -999.990 -999.990 1.302 ..P WKT 2010 12 07 05 54 55 31.3200 -97.3300 251.000 30.0 140.555 4.020 -999.990 -999.990 1.406 ..P WKT 2010 12 07 05 59 55 31.3200 -97.3300 251.000 122.0 125.965 3.980 -999.990 -999.990 1.260 ..P WKT 2010 12 07 06 04 55 31.3200 -97.3300 251.000 457.0 132.805 4.220 -999.990 -999.990 1.328 ..P WKT 2010 12 07 06 14 55 31.3200 -97.3300 251.000 30.0 128.613 4.440 -999.990 -999.990 1.286 ..P WKT 2010 12 07 06 19 55 31.3200 -97.3300 251.000 122.0 123.207 3.940 -999.990 -999.990 1.232 ..P WKT 2010 12 07 06 24 55 31.3200 -97.3300 251.000 457.0 131.999 4.840 -999.990 -999.990 1.320 ..P WKT 2010 12 07 06 29 55 31.3200 -97.3300 251.000 30.0 133.826 4.030 -999.990 -999.990 1.338 ..P WKT 2010 12 07 06 34 55 31.3200 -97.3300 251.000 122.0 128.420 3.850 -999.990 -999.990 1.284 ..P WKT 2010 12 07 06 39 55 31.3200 -97.3300 251.000 457.0 131.988 3.410 -999.990 -999.990 1.320 ..P WKT 2010 12 07 06 49 55 31.3200 -97.3300 251.000 30.0 129.480 3.840 -999.990 -999.990 1.295 ..P WKT 2010 12 07 06 54 55 31.3200 -97.3300 251.000 122.0 126.216 3.700 -999.990 -999.990 1.262 ..P WKT 2010 12 07 06 59 55 31.3200 -97.3300 251.000 457.0 136.752 3.760 -999.990 -999.990 1.368 ..P WKT 2010 12 07 07 04 55 31.3200 -97.3300 251.000 30.0 129.737 4.610 -999.990 -999.990 1.297 ..P WKT 2010 12 07 07 09 55 31.3200 -97.3300 251.000 122.0 130.761 4.040 -999.990 -999.990 1.308 ..P WKT 2010 12 07 07 14 55 31.3200 -97.3300 251.000 457.0 148.800 4.500 -999.990 -999.990 1.488 ..P WKT 2010 12 07 07 24 55 31.3200 -97.3300 251.000 30.0 133.372 4.440 -999.990 -999.990 1.334 ..P WKT 2010 12 07 07 29 55 31.3200 -97.3300 251.000 122.0 124.824 4.720 -999.990 -999.990 1.248 ..P WKT 2010 12 07 07 34 55 31.3200 -97.3300 251.000 457.0 141.602 4.760 -999.990 -999.990 1.416 ..P WKT 2010 12 07 07 39 55 31.3200 -97.3300 251.000 30.0 129.973 4.030 -999.990 -999.990 1.300 ..P WKT 2010 12 07 07 44 55 31.3200 -97.3300 251.000 122.0 126.383 4.200 -999.990 -999.990 1.264 ..P WKT 2010 12 07 07 49 55 31.3200 -97.3300 251.000 457.0 138.202 4.150 -999.990 -999.990 1.382 ..P WKT 2010 12 07 07 59 55 31.3200 -97.3300 251.000 30.0 134.718 5.560 -999.990 -999.990 1.347 ..P WKT 2010 12 07 08 04 55 31.3200 -97.3300 251.000 122.0 127.854 3.970 -999.990 -999.990 1.279 ..P WKT 2010 12 07 08 09 55 31.3200 -97.3300 251.000 457.0 133.453 3.810 -999.990 -999.990 1.335 ..P WKT 2010 12 07 08 14 55 31.3200 -97.3300 251.000 30.0 135.300 3.990 -999.990 -999.990 1.353 ..P WKT 2010 12 07 08 19 55 31.3200 -97.3300 251.000 122.0 128.303 3.990 -999.990 -999.990 1.283 ..P WKT 2010 12 07 08 24 55 31.3200 -97.3300 251.000 457.0 138.056 3.730 -999.990 -999.990 1.381 ..P WKT 2010 12 07 08 34 55 31.3200 -97.3300 251.000 30.0 127.161 4.900 -999.990 -999.990 1.272 ..P WKT 2010 12 07 08 39 55 31.3200 -97.3300 251.000 122.0 130.502 3.740 -999.990 -999.990 1.305 ..P WKT 2010 12 07 08 44 55 31.3200 -97.3300 251.000 457.0 138.801 4.120 -999.990 -999.990 1.388 ..P WKT 2010 12 07 08 49 55 31.3200 -97.3300 251.000 30.0 129.945 4.060 -999.990 -999.990 1.299 ..P WKT 2010 12 07 08 54 55 31.3200 -97.3300 251.000 122.0 130.204 4.090 -999.990 -999.990 1.302 ..P WKT 2010 12 07 08 59 55 31.3200 -97.3300 251.000 457.0 133.410 4.500 -999.990 -999.990 1.334 ..P WKT 2010 12 07 09 09 55 31.3200 -97.3300 251.000 30.0 131.246 4.750 -999.990 -999.990 1.312 ..P WKT 2010 12 07 09 14 55 31.3200 -97.3300 251.000 122.0 127.214 4.220 -999.990 -999.990 1.272 ..P WKT 2010 12 07 09 19 55 31.3200 -97.3300 251.000 457.0 136.855 4.500 -999.990 -999.990 1.369 ..P WKT 2010 12 07 09 24 55 31.3200 -97.3300 251.000 30.0 127.730 5.100 -999.990 -999.990 1.277 ..P WKT 2010 12 07 09 29 55 31.3200 -97.3300 251.000 122.0 127.184 4.960 -999.990 -999.990 1.272 ..P WKT 2010 12 07 09 34 55 31.3200 -97.3300 251.000 457.0 168.997 4.220 -999.990 -999.990 1.690 ..P WKT 2010 12 07 09 44 55 31.3200 -97.3300 251.000 30.0 128.839 4.330 -999.990 -999.990 1.288 ..P WKT 2010 12 07 09 49 55 31.3200 -97.3300 251.000 122.0 133.195 4.330 -999.990 -999.990 1.332 ..P WKT 2010 12 07 09 54 55 31.3200 -97.3300 251.000 457.0 156.856 5.000 -999.990 -999.990 1.569 ..P WKT 2010 12 07 09 59 55 31.3200 -97.3300 251.000 30.0 130.111 4.580 -999.990 -999.990 1.301 ..P WKT 2010 12 07 10 04 55 31.3200 -97.3300 251.000 122.0 123.742 4.770 -999.990 -999.990 1.237 ..P WKT 2010 12 07 10 09 55 31.3200 -97.3300 251.000 457.0 166.710 6.290 -999.990 -999.990 1.667 ..P WKT 2010 12 07 10 19 55 31.3200 -97.3300 251.000 30.0 132.560 4.930 -999.990 -999.990 1.326 ..P WKT 2010 12 07 10 24 55 31.3200 -97.3300 251.000 122.0 126.497 4.660 -999.990 -999.990 1.265 ..P WKT 2010 12 07 10 29 55 31.3200 -97.3300 251.000 457.0 147.251 4.550 -999.990 -999.990 1.473 ..P WKT 2010 12 07 10 34 55 31.3200 -97.3300 251.000 30.0 137.299 5.260 -999.990 -999.990 1.373 ..P WKT 2010 12 07 10 39 55 31.3200 -97.3300 251.000 122.0 123.326 4.490 -999.990 -999.990 1.233 ..P WKT 2010 12 07 10 44 55 31.3200 -97.3300 251.000 457.0 157.890 4.560 -999.990 -999.990 1.579 ..P WKT 2010 12 07 10 54 55 31.3200 -97.3300 251.000 30.0 131.417 3.990 -999.990 -999.990 1.314 ..P WKT 2010 12 07 10 59 55 31.3200 -97.3300 251.000 122.0 121.466 4.810 -999.990 -999.990 1.215 ..P WKT 2010 12 07 11 04 55 31.3200 -97.3300 251.000 457.0 173.598 4.860 -999.990 -999.990 1.736 ..P WKT 2010 12 07 11 09 55 31.3200 -97.3300 251.000 30.0 136.426 5.090 -999.990 -999.990 1.364 ..P WKT 2010 12 07 11 14 55 31.3200 -97.3300 251.000 122.0 134.251 4.710 -999.990 -999.990 1.343 ..P WKT 2010 12 07 11 19 55 31.3200 -97.3300 251.000 457.0 146.692 4.560 -999.990 -999.990 1.467 ..P WKT 2010 12 07 11 29 55 31.3200 -97.3300 251.000 30.0 129.790 4.220 -999.990 -999.990 1.298 ..P WKT 2010 12 07 11 34 55 31.3200 -97.3300 251.000 122.0 133.032 4.350 -999.990 -999.990 1.330 ..P WKT 2010 12 07 11 39 55 31.3200 -97.3300 251.000 457.0 151.965 5.030 -999.990 -999.990 1.520 ..P WKT 2010 12 07 11 44 55 31.3200 -97.3300 251.000 30.0 135.761 4.870 -999.990 -999.990 1.358 ..P WKT 2010 12 07 11 49 55 31.3200 -97.3300 251.000 122.0 131.493 4.350 -999.990 -999.990 1.315 ..P WKT 2010 12 07 12 09 55 31.3200 -97.3300 251.000 457.0 142.795 5.230 -999.990 -999.990 1.428 ..P WKT 2010 12 07 12 10 25 31.3200 -97.3300 251.000 457.0 142.333 5.820 -999.990 -999.990 1.423 ..P WKT 2010 12 07 12 10 55 31.3200 -97.3300 251.000 457.0 147.505 4.430 -999.990 -999.990 1.475 ..P WKT 2010 12 07 12 11 25 31.3200 -97.3300 251.000 457.0 147.044 4.650 -999.990 -999.990 1.470 ..P WKT 2010 12 07 12 11 55 31.3200 -97.3300 251.000 457.0 143.095 4.470 -999.990 -999.990 1.431 ..P WKT 2010 12 07 12 12 25 31.3200 -97.3300 251.000 457.0 141.694 4.640 -999.990 -999.990 1.417 ..P WKT 2010 12 07 12 12 55 31.3200 -97.3300 251.000 457.0 141.634 4.880 -999.990 -999.990 1.416 ..P WKT 2010 12 07 12 13 25 31.3200 -97.3300 251.000 457.0 143.050 4.880 -999.990 -999.990 1.431 ..P WKT 2010 12 07 12 13 55 31.3200 -97.3300 251.000 457.0 142.723 4.610 -999.990 -999.990 1.427 ..P WKT 2010 12 07 12 14 25 31.3200 -97.3300 251.000 457.0 148.566 5.190 -999.990 -999.990 1.486 ..P WKT 2010 12 07 12 14 55 31.3200 -97.3300 251.000 457.0 151.861 5.030 -999.990 -999.990 1.519 ..P WKT 2010 12 07 12 19 55 31.3200 -97.3300 251.000 30.0 130.475 4.720 -999.990 -999.990 1.305 ..P WKT 2010 12 07 12 24 55 31.3200 -97.3300 251.000 122.0 131.357 5.340 -999.990 -999.990 1.314 ..P WKT 2010 12 07 12 29 55 31.3200 -97.3300 251.000 457.0 135.460 5.460 -999.990 -999.990 1.355 ..P WKT 2010 12 07 12 34 55 31.3200 -97.3300 251.000 30.0 139.966 4.740 -999.990 -999.990 1.400 ..P WKT 2010 12 07 12 39 55 31.3200 -97.3300 251.000 122.0 134.006 4.600 -999.990 -999.990 1.340 ..P WKT 2010 12 07 12 44 55 31.3200 -97.3300 251.000 457.0 135.828 5.000 -999.990 -999.990 1.358 ..P WKT 2010 12 07 12 54 55 31.3200 -97.3300 251.000 30.0 141.757 4.190 -999.990 -999.990 1.418 ..P WKT 2010 12 07 12 59 55 31.3200 -97.3300 251.000 122.0 144.790 4.460 -999.990 -999.990 1.448 ..P WKT 2010 12 07 13 04 55 31.3200 -97.3300 251.000 457.0 137.085 5.520 -999.990 -999.990 1.371 ..P WKT 2010 12 07 13 09 55 31.3200 -97.3300 251.000 30.0 143.609 5.070 -999.990 -999.990 1.436 ..P WKT 2010 12 07 13 14 55 31.3200 -97.3300 251.000 122.0 166.782 4.740 -999.990 -999.990 1.668 ..P WKT 2010 12 07 13 19 55 31.3200 -97.3300 251.000 457.0 133.297 4.820 -999.990 -999.990 1.333 ..P WKT 2010 12 07 13 29 55 31.3200 -97.3300 251.000 30.0 151.873 4.850 -999.990 -999.990 1.519 ..P WKT 2010 12 07 13 34 55 31.3200 -97.3300 251.000 122.0 168.492 4.940 -999.990 -999.990 1.685 ..P WKT 2010 12 07 13 39 55 31.3200 -97.3300 251.000 457.0 145.358 4.600 -999.990 -999.990 1.454 ..P WKT 2010 12 07 13 44 55 31.3200 -97.3300 251.000 30.0 157.144 5.790 -999.990 -999.990 1.571 ..P WKT 2010 12 07 13 49 55 31.3200 -97.3300 251.000 122.0 139.379 4.900 -999.990 -999.990 1.394 ..P WKT 2010 12 07 13 54 55 31.3200 -97.3300 251.000 457.0 146.867 4.340 -999.990 -999.990 1.469 ..P WKT 2010 12 07 14 04 55 31.3200 -97.3300 251.000 30.0 166.145 4.350 -999.990 -999.990 1.661 ..P WKT 2010 12 07 14 09 55 31.3200 -97.3300 251.000 122.0 136.553 5.130 -999.990 -999.990 1.366 ..P WKT 2010 12 07 14 14 55 31.3200 -97.3300 251.000 457.0 147.268 4.720 -999.990 -999.990 1.473 ..P WKT 2010 12 07 14 19 55 31.3200 -97.3300 251.000 30.0 145.351 5.820 -999.990 -999.990 1.454 ..P WKT 2010 12 07 14 24 55 31.3200 -97.3300 251.000 122.0 133.222 5.000 -999.990 -999.990 1.332 ..P WKT 2010 12 07 14 29 55 31.3200 -97.3300 251.000 457.0 146.762 4.470 -999.990 -999.990 1.468 ..P WKT 2010 12 07 14 39 55 31.3200 -97.3300 251.000 30.0 151.896 5.040 -999.990 -999.990 1.519 ..P WKT 2010 12 07 14 44 55 31.3200 -97.3300 251.000 122.0 139.457 4.990 -999.990 -999.990 1.395 ..P WKT 2010 12 07 14 49 55 31.3200 -97.3300 251.000 457.0 140.593 5.430 -999.990 -999.990 1.406 ..P WKT 2010 12 07 14 54 55 31.3200 -97.3300 251.000 30.0 147.780 5.060 -999.990 -999.990 1.478 ..P WKT 2010 12 07 14 59 55 31.3200 -97.3300 251.000 122.0 132.514 4.640 -999.990 -999.990 1.325 ..P WKT 2010 12 07 15 04 55 31.3200 -97.3300 251.000 457.0 132.709 4.610 -999.990 -999.990 1.327 ..P WKT 2010 12 07 15 14 55 31.3200 -97.3300 251.000 30.0 145.145 5.060 -999.990 -999.990 1.451 ..P WKT 2010 12 07 15 19 55 31.3200 -97.3300 251.000 122.0 141.652 4.760 -999.990 -999.990 1.417 ..P WKT 2010 12 07 15 24 55 31.3200 -97.3300 251.000 457.0 128.744 5.110 -999.990 -999.990 1.287 ..P WKT 2010 12 07 15 29 55 31.3200 -97.3300 251.000 30.0 142.197 5.020 -999.990 -999.990 1.422 ..P WKT 2010 12 07 15 34 55 31.3200 -97.3300 251.000 122.0 146.102 4.990 -999.990 -999.990 1.461 ..P WKT 2010 12 07 15 39 55 31.3200 -97.3300 251.000 457.0 133.326 4.630 -999.990 -999.990 1.333 ..P WKT 2010 12 07 15 49 55 31.3200 -97.3300 251.000 30.0 144.442 4.680 -999.990 -999.990 1.444 ..P WKT 2010 12 07 15 54 55 31.3200 -97.3300 251.000 122.0 145.061 7.570 -999.990 -999.990 1.451 ..P WKT 2010 12 07 15 59 55 31.3200 -97.3300 251.000 457.0 132.089 6.610 -999.990 -999.990 1.321 ..P WKT 2010 12 07 16 04 55 31.3200 -97.3300 251.000 30.0 139.840 4.420 -999.990 -999.990 1.398 ..P WKT 2010 12 07 16 09 55 31.3200 -97.3300 251.000 122.0 140.593 4.550 -999.990 -999.990 1.406 ..P WKT 2010 12 07 16 14 55 31.3200 -97.3300 251.000 457.0 134.078 4.560 -999.990 -999.990 1.341 ..P WKT 2010 12 07 16 24 55 31.3200 -97.3300 251.000 30.0 136.334 4.670 -999.990 -999.990 1.363 ..P WKT 2010 12 07 16 29 55 31.3200 -97.3300 251.000 122.0 139.722 4.890 -999.990 -999.990 1.397 ..P WKT 2010 12 07 16 34 55 31.3200 -97.3300 251.000 457.0 128.033 5.490 -999.990 -999.990 1.280 ..P WKT 2010 12 07 16 39 55 31.3200 -97.3300 251.000 30.0 144.615 5.680 -999.990 -999.990 1.446 ..P WKT 2010 12 07 16 44 55 31.3200 -97.3300 251.000 122.0 141.542 6.260 -999.990 -999.990 1.415 ..P WKT 2010 12 07 16 49 55 31.3200 -97.3300 251.000 457.0 129.849 4.640 -999.990 -999.990 1.298 ..P WKT 2010 12 07 17 04 55 31.3200 -97.3300 251.000 30.0 144.962 6.040 -999.990 -999.990 1.450 ..P WKT 2010 12 07 17 09 55 31.3200 -97.3300 251.000 122.0 143.551 5.590 -999.990 -999.990 1.436 ..P WKT 2010 12 07 17 14 55 31.3200 -97.3300 251.000 457.0 132.711 5.670 -999.990 -999.990 1.327 ..P WKT 2010 12 07 17 19 55 31.3200 -97.3300 251.000 30.0 145.580 4.780 -999.990 -999.990 1.456 ..P WKT 2010 12 07 17 24 55 31.3200 -97.3300 251.000 122.0 150.366 4.570 -999.990 -999.990 1.504 ..P WKT 2010 12 07 17 29 55 31.3200 -97.3300 251.000 457.0 147.339 4.420 -999.990 -999.990 1.473 ..P WKT 2010 12 07 17 39 55 31.3200 -97.3300 251.000 30.0 161.909 4.960 -999.990 -999.990 1.619 ..P WKT 2010 12 07 17 44 55 31.3200 -97.3300 251.000 122.0 159.027 5.070 -999.990 -999.990 1.590 ..P WKT 2010 12 07 17 49 55 31.3200 -97.3300 251.000 457.0 141.589 5.410 -999.990 -999.990 1.416 ..P WKT 2010 12 07 17 54 55 31.3200 -97.3300 251.000 30.0 164.312 5.110 -999.990 -999.990 1.643 ..P WKT 2010 12 07 17 59 55 31.3200 -97.3300 251.000 122.0 167.630 4.890 -999.990 -999.990 1.676 ..P WKT 2010 12 07 18 04 55 31.3200 -97.3300 251.000 457.0 163.129 6.890 -999.990 -999.990 1.631 ..P WKT 2010 12 07 18 14 55 31.3200 -97.3300 251.000 30.0 165.335 5.690 -999.990 -999.990 1.653 ..P WKT 2010 12 07 18 19 55 31.3200 -97.3300 251.000 122.0 164.762 5.810 -999.990 -999.990 1.648 ..P WKT 2010 12 07 18 24 55 31.3200 -97.3300 251.000 457.0 149.223 5.620 -999.990 -999.990 1.492 ..P WKT 2010 12 07 18 29 55 31.3200 -97.3300 251.000 30.0 153.099 5.280 -999.990 -999.990 1.531 ..P WKT 2010 12 07 18 34 55 31.3200 -97.3300 251.000 122.0 146.458 5.040 -999.990 -999.990 1.465 ..P WKT 2010 12 07 18 39 55 31.3200 -97.3300 251.000 457.0 141.973 4.680 -999.990 -999.990 1.420 ..P WKT 2010 12 07 18 49 55 31.3200 -97.3300 251.000 30.0 146.065 4.910 -999.990 -999.990 1.461 ..P WKT 2010 12 07 18 54 55 31.3200 -97.3300 251.000 122.0 140.480 5.240 -999.990 -999.990 1.405 ..P WKT 2010 12 07 18 59 55 31.3200 -97.3300 251.000 457.0 145.283 5.330 -999.990 -999.990 1.453 ..P WKT 2010 12 07 19 04 55 31.3200 -97.3300 251.000 30.0 144.015 6.270 -999.990 -999.990 1.440 ..P WKT 2010 12 07 19 09 55 31.3200 -97.3300 251.000 122.0 146.794 5.200 -999.990 -999.990 1.468 ..P WKT 2010 12 07 19 14 55 31.3200 -97.3300 251.000 457.0 147.415 5.040 -999.990 -999.990 1.474 ..P WKT 2010 12 07 19 24 55 31.3200 -97.3300 251.000 30.0 149.929 5.090 -999.990 -999.990 1.499 ..P WKT 2010 12 07 19 29 55 31.3200 -97.3300 251.000 122.0 146.965 5.050 -999.990 -999.990 1.470 ..P WKT 2010 12 07 19 34 55 31.3200 -97.3300 251.000 457.0 145.619 5.590 -999.990 -999.990 1.456 ..P WKT 2010 12 07 19 39 55 31.3200 -97.3300 251.000 30.0 149.537 5.460 -999.990 -999.990 1.495 ..P WKT 2010 12 07 19 44 55 31.3200 -97.3300 251.000 122.0 144.412 5.140 -999.990 -999.990 1.444 ..P WKT 2010 12 07 19 49 55 31.3200 -97.3300 251.000 457.0 143.201 5.380 -999.990 -999.990 1.432 ..P WKT 2010 12 07 19 59 55 31.3200 -97.3300 251.000 30.0 148.647 5.780 -999.990 -999.990 1.486 ..P WKT 2010 12 07 20 04 55 31.3200 -97.3300 251.000 122.0 142.209 5.090 -999.990 -999.990 1.422 ..P WKT 2010 12 07 20 09 55 31.3200 -97.3300 251.000 457.0 143.197 5.160 -999.990 -999.990 1.432 ..P WKT 2010 12 07 20 14 55 31.3200 -97.3300 251.000 30.0 150.126 5.060 -999.990 -999.990 1.501 ..P WKT 2010 12 07 20 19 55 31.3200 -97.3300 251.000 122.0 144.092 5.060 -999.990 -999.990 1.441 ..P WKT 2010 12 07 20 24 55 31.3200 -97.3300 251.000 457.0 142.919 4.730 -999.990 -999.990 1.429 ..P WKT 2010 12 07 20 34 55 31.3200 -97.3300 251.000 30.0 155.527 5.420 -999.990 -999.990 1.555 ..P WKT 2010 12 07 20 39 55 31.3200 -97.3300 251.000 122.0 139.592 5.200 -999.990 -999.990 1.396 ..P WKT 2010 12 07 20 44 55 31.3200 -97.3300 251.000 457.0 143.919 5.050 -999.990 -999.990 1.439 ..P WKT 2010 12 07 20 49 55 31.3200 -97.3300 251.000 30.0 146.625 5.240 -999.990 -999.990 1.466 ..P WKT 2010 12 07 20 54 55 31.3200 -97.3300 251.000 122.0 145.007 5.330 -999.990 -999.990 1.450 ..P WKT 2010 12 07 20 59 55 31.3200 -97.3300 251.000 457.0 145.822 5.120 -999.990 -999.990 1.458 ..P WKT 2010 12 07 21 09 55 31.3200 -97.3300 251.000 30.0 149.343 5.090 -999.990 -999.990 1.493 ..P WKT 2010 12 07 21 14 55 31.3200 -97.3300 251.000 122.0 149.618 5.010 -999.990 -999.990 1.496 ..P WKT 2010 12 07 21 19 55 31.3200 -97.3300 251.000 457.0 144.756 5.280 -999.990 -999.990 1.448 ..P WKT 2010 12 07 21 24 55 31.3200 -97.3300 251.000 30.0 146.112 5.620 -999.990 -999.990 1.461 ..P WKT 2010 12 07 21 29 55 31.3200 -97.3300 251.000 122.0 144.764 5.170 -999.990 -999.990 1.448 ..P WKT 2010 12 07 21 34 55 31.3200 -97.3300 251.000 457.0 146.931 6.090 -999.990 -999.990 1.469 ..P WKT 2010 12 07 21 44 55 31.3200 -97.3300 251.000 30.0 150.068 5.360 -999.990 -999.990 1.501 ..P WKT 2010 12 07 21 49 55 31.3200 -97.3300 251.000 122.0 151.038 4.900 -999.990 -999.990 1.510 ..P WKT 2010 12 07 21 54 55 31.3200 -97.3300 251.000 457.0 146.059 4.860 -999.990 -999.990 1.461 ..P WKT 2010 12 07 21 59 55 31.3200 -97.3300 251.000 30.0 143.512 5.120 -999.990 -999.990 1.435 ..P WKT 2010 12 07 22 04 55 31.3200 -97.3300 251.000 122.0 144.482 5.380 -999.990 -999.990 1.445 ..P WKT 2010 12 07 22 09 55 31.3200 -97.3300 251.000 457.0 146.535 5.160 -999.990 -999.990 1.465 ..P WKT 2010 12 07 22 19 55 31.3200 -97.3300 251.000 30.0 134.793 5.700 -999.990 -999.990 1.348 ..P WKT 2010 12 07 22 24 55 31.3200 -97.3300 251.000 122.0 142.237 5.700 -999.990 -999.990 1.422 ..P WKT 2010 12 07 22 29 55 31.3200 -97.3300 251.000 457.0 139.129 6.390 -999.990 -999.990 1.391 ..P WKT 2010 12 07 22 34 55 31.3200 -97.3300 251.000 30.0 142.785 5.150 -999.990 -999.990 1.428 ..P WKT 2010 12 07 22 39 55 31.3200 -97.3300 251.000 122.0 150.773 5.840 -999.990 -999.990 1.508 ..P WKT 2010 12 07 22 44 55 31.3200 -97.3300 251.000 457.0 147.664 7.330 -999.990 -999.990 1.477 ..P WKT 2010 12 07 22 54 55 31.3200 -97.3300 251.000 30.0 150.805 5.340 -999.990 -999.990 1.508 ..P WKT 2010 12 07 22 59 55 31.3200 -97.3300 251.000 122.0 144.332 6.100 -999.990 -999.990 1.443 ..P WKT 2010 12 07 23 04 55 31.3200 -97.3300 251.000 457.0 145.302 5.480 -999.990 -999.990 1.453 ..P WKT 2010 12 07 23 09 55 31.3200 -97.3300 251.000 30.0 145.190 5.380 -999.990 -999.990 1.452 ..P WKT 2010 12 07 23 14 55 31.3200 -97.3300 251.000 122.0 145.350 5.310 -999.990 -999.990 1.454 ..P WKT 2010 12 07 23 19 55 31.3200 -97.3300 251.000 457.0 142.123 5.480 -999.990 -999.990 1.421 ..P WKT 2010 12 07 23 29 55 31.3200 -97.3300 251.000 30.0 146.382 5.380 -999.990 -999.990 1.464 ..P WKT 2010 12 07 23 34 55 31.3200 -97.3300 251.000 122.0 143.440 5.650 -999.990 -999.990 1.434 ..P WKT 2010 12 07 23 39 55 31.3200 -97.3300 251.000 457.0 144.561 5.240 -999.990 -999.990 1.446 ..P WKT 2010 12 07 23 44 55 31.3200 -97.3300 251.000 30.0 148.527 5.310 -999.990 -999.990 1.485 ..P WKT 2010 12 07 23 49 55 31.3200 -97.3300 251.000 122.0 152.763 5.180 -999.990 -999.990 1.528 ..P WKT 2010 12 08 00 09 55 31.3200 -97.3300 251.000 457.0 146.211 5.570 -999.990 -999.990 1.462 ..P WKT 2010 12 08 00 10 25 31.3200 -97.3300 251.000 457.0 147.301 5.930 -999.990 -999.990 1.473 ..P WKT 2010 12 08 00 10 55 31.3200 -97.3300 251.000 457.0 145.411 5.910 -999.990 -999.990 1.454 ..P WKT 2010 12 08 00 11 25 31.3200 -97.3300 251.000 457.0 142.438 4.890 -999.990 -999.990 1.424 ..P WKT 2010 12 08 00 11 55 31.3200 -97.3300 251.000 457.0 142.986 5.390 -999.990 -999.990 1.430 ..P WKT 2010 12 08 00 12 25 31.3200 -97.3300 251.000 457.0 149.224 4.910 -999.990 -999.990 1.492 ..P WKT 2010 12 08 00 12 55 31.3200 -97.3300 251.000 457.0 143.542 4.980 -999.990 -999.990 1.435 ..P WKT 2010 12 08 00 13 25 31.3200 -97.3300 251.000 457.0 144.089 5.160 -999.990 -999.990 1.441 ..P WKT 2010 12 08 00 13 55 31.3200 -97.3300 251.000 457.0 139.762 5.380 -999.990 -999.990 1.398 ..P WKT 2010 12 08 00 14 25 31.3200 -97.3300 251.000 457.0 147.353 5.120 -999.990 -999.990 1.474 ..P WKT 2010 12 08 00 14 55 31.3200 -97.3300 251.000 457.0 150.610 5.620 -999.990 -999.990 1.506 ..P WKT 2010 12 08 00 19 55 31.3200 -97.3300 251.000 30.0 155.823 5.750 -999.990 -999.990 1.558 ..P WKT 2010 12 08 00 24 55 31.3200 -97.3300 251.000 122.0 150.742 4.950 -999.990 -999.990 1.507 ..P WKT 2010 12 08 00 29 55 31.3200 -97.3300 251.000 457.0 153.517 4.950 -999.990 -999.990 1.535 ..P WKT 2010 12 08 00 34 55 31.3200 -97.3300 251.000 30.0 153.040 6.410 -999.990 -999.990 1.530 ..P WKT 2010 12 08 00 39 55 31.3200 -97.3300 251.000 122.0 152.293 5.560 -999.990 -999.990 1.523 ..P WKT 2010 12 08 00 44 55 31.3200 -97.3300 251.000 457.0 154.796 5.020 -999.990 -999.990 1.548 ..P WKT 2010 12 08 00 54 55 31.3200 -97.3300 251.000 30.0 164.321 5.550 -999.990 -999.990 1.643 ..P WKT 2010 12 08 00 59 55 31.3200 -97.3300 251.000 122.0 154.825 4.900 -999.990 -999.990 1.548 ..P WKT 2010 12 08 01 04 55 31.3200 -97.3300 251.000 457.0 156.432 5.240 -999.990 -999.990 1.564 ..P WKT 2010 12 08 01 09 55 31.3200 -97.3300 251.000 30.0 159.121 5.040 -999.990 -999.990 1.591 ..P WKT 2010 12 08 01 14 55 31.3200 -97.3300 251.000 122.0 155.041 4.610 -999.990 -999.990 1.550 ..P WKT 2010 12 08 01 19 55 31.3200 -97.3300 251.000 457.0 164.500 4.770 -999.990 -999.990 1.645 ..P WKT 2010 12 08 01 29 55 31.3200 -97.3300 251.000 30.0 161.910 4.940 -999.990 -999.990 1.619 ..P WKT 2010 12 08 01 34 55 31.3200 -97.3300 251.000 122.0 168.272 4.630 -999.990 -999.990 1.683 ..P WKT 2010 12 08 01 39 55 31.3200 -97.3300 251.000 457.0 161.099 4.590 -999.990 -999.990 1.611 ..P WKT 2010 12 08 01 44 55 31.3200 -97.3300 251.000 30.0 161.506 5.130 -999.990 -999.990 1.615 ..P WKT 2010 12 08 01 49 55 31.3200 -97.3300 251.000 122.0 164.619 4.530 -999.990 -999.990 1.646 ..P WKT 2010 12 08 01 54 55 31.3200 -97.3300 251.000 457.0 160.695 4.650 -999.990 -999.990 1.607 ..P WKT 2010 12 08 02 04 55 31.3200 -97.3300 251.000 30.0 162.418 4.520 -999.990 -999.990 1.624 ..P WKT 2010 12 08 02 09 55 31.3200 -97.3300 251.000 122.0 166.710 4.660 -999.990 -999.990 1.667 ..P WKT 2010 12 08 02 14 55 31.3200 -97.3300 251.000 457.0 159.636 4.860 -999.990 -999.990 1.596 ..P WKT 2010 12 08 02 19 55 31.3200 -97.3300 251.000 30.0 172.454 5.020 -999.990 -999.990 1.725 ..P WKT 2010 12 08 02 24 55 31.3200 -97.3300 251.000 122.0 163.754 5.160 -999.990 -999.990 1.638 ..P WKT 2010 12 08 02 29 55 31.3200 -97.3300 251.000 457.0 161.957 5.020 -999.990 -999.990 1.620 ..P WKT 2010 12 08 02 39 55 31.3200 -97.3300 251.000 30.0 175.180 5.210 -999.990 -999.990 1.752 ..P WKT 2010 12 08 02 44 55 31.3200 -97.3300 251.000 122.0 171.257 5.150 -999.990 -999.990 1.713 ..P WKT 2010 12 08 02 49 55 31.3200 -97.3300 251.000 457.0 165.304 5.040 -999.990 -999.990 1.653 ..P WKT 2010 12 08 02 54 55 31.3200 -97.3300 251.000 30.0 179.646 4.590 -999.990 -999.990 1.796 ..P WKT 2010 12 08 02 59 55 31.3200 -97.3300 251.000 122.0 173.017 4.740 -999.990 -999.990 1.730 ..P WKT 2010 12 08 03 04 55 31.3200 -97.3300 251.000 457.0 167.471 4.600 -999.990 -999.990 1.675 ..P WKT 2010 12 08 03 14 55 31.3200 -97.3300 251.000 30.0 172.496 4.470 -999.990 -999.990 1.725 ..P WKT 2010 12 08 03 19 55 31.3200 -97.3300 251.000 122.0 172.651 4.890 -999.990 -999.990 1.727 ..P WKT 2010 12 08 03 24 55 31.3200 -97.3300 251.000 457.0 159.009 4.440 -999.990 -999.990 1.590 ..P WKT 2010 12 08 03 29 55 31.3200 -97.3300 251.000 30.0 189.192 4.660 -999.990 -999.990 1.892 ..P WKT 2010 12 08 03 34 55 31.3200 -97.3300 251.000 122.0 164.460 3.990 -999.990 -999.990 1.645 ..P WKT 2010 12 08 03 39 55 31.3200 -97.3300 251.000 457.0 153.254 5.090 -999.990 -999.990 1.533 ..P WKT 2010 12 08 03 49 55 31.3200 -97.3300 251.000 30.0 194.446 4.200 -999.990 -999.990 1.944 ..P WKT 2010 12 08 03 54 55 31.3200 -97.3300 251.000 122.0 174.083 4.480 -999.990 -999.990 1.741 ..P WKT 2010 12 08 03 59 55 31.3200 -97.3300 251.000 457.0 162.512 4.490 -999.990 -999.990 1.625 ..P WKT 2010 12 08 04 04 55 31.3200 -97.3300 251.000 30.0 187.587 4.470 -999.990 -999.990 1.876 ..P WKT 2010 12 08 04 09 55 31.3200 -97.3300 251.000 122.0 184.806 4.450 -999.990 -999.990 1.848 ..P WKT 2010 12 08 04 14 55 31.3200 -97.3300 251.000 457.0 161.606 4.280 -999.990 -999.990 1.616 ..P WKT 2010 12 08 04 24 55 31.3200 -97.3300 251.000 30.0 187.529 5.380 -999.990 -999.990 1.875 ..P WKT 2010 12 08 04 29 55 31.3200 -97.3300 251.000 122.0 192.299 5.330 -999.990 -999.990 1.923 ..P WKT 2010 12 08 04 34 55 31.3200 -97.3300 251.000 457.0 156.782 5.120 -999.990 -999.990 1.568 ..P WKT 2010 12 08 04 39 55 31.3200 -97.3300 251.000 30.0 192.916 4.730 -999.990 -999.990 1.929 ..P WKT 2010 12 08 04 44 55 31.3200 -97.3300 251.000 122.0 192.549 4.470 -999.990 -999.990 1.925 ..P WKT 2010 12 08 04 49 55 31.3200 -97.3300 251.000 457.0 152.439 5.070 -999.990 -999.990 1.524 ..P WKT 2010 12 08 05 04 55 31.3200 -97.3300 251.000 30.0 195.569 5.120 -999.990 -999.990 1.956 ..P WKT 2010 12 08 05 09 55 31.3200 -97.3300 251.000 122.0 206.772 4.750 -999.990 -999.990 2.068 ..P WKT 2010 12 08 05 14 55 31.3200 -97.3300 251.000 457.0 173.914 6.740 -999.990 -999.990 1.739 ..P WKT 2010 12 08 05 19 55 31.3200 -97.3300 251.000 30.0 201.065 5.390 -999.990 -999.990 2.011 ..P WKT 2010 12 08 05 24 55 31.3200 -97.3300 251.000 122.0 212.807 4.960 -999.990 -999.990 2.128 ..P WKT 2010 12 08 05 29 55 31.3200 -97.3300 251.000 457.0 167.521 4.620 -999.990 -999.990 1.675 ..P WKT 2010 12 08 05 39 55 31.3200 -97.3300 251.000 30.0 232.735 4.960 -999.990 -999.990 2.327 ..P WKT 2010 12 08 05 44 55 31.3200 -97.3300 251.000 122.0 230.533 4.810 -999.990 -999.990 2.305 ..P WKT 2010 12 08 05 49 55 31.3200 -97.3300 251.000 457.0 175.094 4.260 -999.990 -999.990 1.751 ..P WKT 2010 12 08 05 54 55 31.3200 -97.3300 251.000 30.0 232.884 4.340 -999.990 -999.990 2.329 ..P WKT 2010 12 08 05 59 55 31.3200 -97.3300 251.000 122.0 233.924 4.250 -999.990 -999.990 2.339 ..P WKT 2010 12 08 06 04 55 31.3200 -97.3300 251.000 457.0 217.536 5.210 -999.990 -999.990 2.175 ..P WKT 2010 12 08 06 14 55 31.3200 -97.3300 251.000 30.0 221.162 4.350 -999.990 -999.990 2.212 ..P WKT 2010 12 08 06 19 55 31.3200 -97.3300 251.000 122.0 213.209 4.060 -999.990 -999.990 2.132 ..P WKT 2010 12 08 06 24 55 31.3200 -97.3300 251.000 457.0 172.298 4.840 -999.990 -999.990 1.723 ..P WKT 2010 12 08 06 29 55 31.3200 -97.3300 251.000 30.0 204.195 4.630 -999.990 -999.990 2.042 ..P WKT 2010 12 08 06 34 55 31.3200 -97.3300 251.000 122.0 200.972 4.560 -999.990 -999.990 2.010 ..P WKT 2010 12 08 06 39 55 31.3200 -97.3300 251.000 457.0 206.123 5.140 -999.990 -999.990 2.061 ..P WKT 2010 12 08 06 49 55 31.3200 -97.3300 251.000 30.0 195.124 5.560 -999.990 -999.990 1.951 ..P WKT 2010 12 08 06 54 55 31.3200 -97.3300 251.000 122.0 190.049 5.200 -999.990 -999.990 1.900 ..P WKT 2010 12 08 06 59 55 31.3200 -97.3300 251.000 457.0 175.117 5.000 -999.990 -999.990 1.751 ..P WKT 2010 12 08 07 04 55 31.3200 -97.3300 251.000 30.0 187.463 4.640 -999.990 -999.990 1.875 ..P WKT 2010 12 08 07 09 55 31.3200 -97.3300 251.000 122.0 182.525 4.520 -999.990 -999.990 1.825 ..P WKT 2010 12 08 07 14 55 31.3200 -97.3300 251.000 457.0 177.452 5.810 -999.990 -999.990 1.775 ..P WKT 2010 12 08 07 24 55 31.3200 -97.3300 251.000 30.0 192.227 5.330 -999.990 -999.990 1.922 ..P WKT 2010 12 08 07 29 55 31.3200 -97.3300 251.000 122.0 195.737 5.130 -999.990 -999.990 1.957 ..P WKT 2010 12 08 07 34 55 31.3200 -97.3300 251.000 457.0 178.590 4.490 -999.990 -999.990 1.786 ..P WKT 2010 12 08 07 39 55 31.3200 -97.3300 251.000 30.0 183.855 5.190 -999.990 -999.990 1.839 ..P WKT 2010 12 08 07 44 55 31.3200 -97.3300 251.000 122.0 181.155 5.070 -999.990 -999.990 1.812 ..P WKT 2010 12 08 07 49 55 31.3200 -97.3300 251.000 457.0 162.796 3.490 -999.990 -999.990 1.628 ..P WKT 2010 12 08 07 59 55 31.3200 -97.3300 251.000 30.0 158.537 3.470 -999.990 -999.990 1.585 ..P WKT 2010 12 08 08 04 55 31.3200 -97.3300 251.000 122.0 153.061 4.170 -999.990 -999.990 1.531 ..P WKT 2010 12 08 08 09 55 31.3200 -97.3300 251.000 457.0 152.176 4.640 -999.990 -999.990 1.522 ..P WKT 2010 12 08 08 14 55 31.3200 -97.3300 251.000 30.0 145.351 4.060 -999.990 -999.990 1.454 ..P WKT 2010 12 08 08 19 55 31.3200 -97.3300 251.000 122.0 150.404 3.770 -999.990 -999.990 1.504 ..P WKT 2010 12 08 08 24 55 31.3200 -97.3300 251.000 457.0 163.553 4.670 -999.990 -999.990 1.636 ..P WKT 2010 12 08 08 34 55 31.3200 -97.3300 251.000 30.0 151.352 4.370 -999.990 -999.990 1.514 ..P WKT 2010 12 08 08 39 55 31.3200 -97.3300 251.000 122.0 156.770 3.550 -999.990 -999.990 1.568 ..P WKT 2010 12 08 08 44 55 31.3200 -97.3300 251.000 457.0 165.695 3.940 -999.990 -999.990 1.657 ..P WKT 2010 12 08 08 49 55 31.3200 -97.3300 251.000 30.0 155.731 3.410 -999.990 -999.990 1.557 ..P WKT 2010 12 08 08 54 55 31.3200 -97.3300 251.000 122.0 151.704 3.280 -999.990 -999.990 1.517 ..P WKT 2010 12 08 08 59 55 31.3200 -97.3300 251.000 457.0 162.247 3.480 -999.990 -999.990 1.622 ..P WKT 2010 12 08 09 09 55 31.3200 -97.3300 251.000 30.0 157.083 3.200 -999.990 -999.990 1.571 ..P WKT 2010 12 08 09 14 55 31.3200 -97.3300 251.000 122.0 155.408 3.830 -999.990 -999.990 1.554 ..P WKT 2010 12 08 09 19 55 31.3200 -97.3300 251.000 457.0 155.081 3.090 -999.990 -999.990 1.551 ..P WKT 2010 12 08 09 24 55 31.3200 -97.3300 251.000 30.0 147.202 3.280 -999.990 -999.990 1.472 ..P WKT 2010 12 08 09 29 55 31.3200 -97.3300 251.000 122.0 153.619 3.580 -999.990 -999.990 1.536 ..P WKT 2010 12 08 09 34 55 31.3200 -97.3300 251.000 457.0 163.543 2.650 -999.990 -999.990 1.635 ..P WKT 2010 12 08 09 44 55 31.3200 -97.3300 251.000 30.0 151.156 2.760 -999.990 -999.990 1.512 ..P WKT 2010 12 08 09 49 55 31.3200 -97.3300 251.000 122.0 158.517 2.990 -999.990 -999.990 1.585 ..P WKT 2010 12 08 09 54 55 31.3200 -97.3300 251.000 457.0 183.272 4.300 -999.990 -999.990 1.833 ..P WKT 2010 12 08 09 59 55 31.3200 -97.3300 251.000 30.0 154.896 3.390 -999.990 -999.990 1.549 ..P WKT 2010 12 08 10 04 55 31.3200 -97.3300 251.000 122.0 155.244 3.480 -999.990 -999.990 1.552 ..P WKT 2010 12 08 10 09 55 31.3200 -97.3300 251.000 457.0 170.289 4.230 -999.990 -999.990 1.703 ..P WKT 2010 12 08 10 19 55 31.3200 -97.3300 251.000 30.0 142.381 3.950 -999.990 -999.990 1.424 ..P WKT 2010 12 08 10 24 55 31.3200 -97.3300 251.000 122.0 151.474 3.820 -999.990 -999.990 1.515 ..P WKT 2010 12 08 10 29 55 31.3200 -97.3300 251.000 457.0 152.341 3.710 -999.990 -999.990 1.523 ..P WKT 2010 12 08 10 34 55 31.3200 -97.3300 251.000 30.0 156.848 4.160 -999.990 -999.990 1.568 ..P WKT 2010 12 08 10 39 55 31.3200 -97.3300 251.000 122.0 155.020 3.580 -999.990 -999.990 1.550 ..P WKT 2010 12 08 10 44 55 31.3200 -97.3300 251.000 457.0 152.518 3.850 -999.990 -999.990 1.525 ..P WKT 2010 12 08 10 54 55 31.3200 -97.3300 251.000 30.0 163.032 3.540 -999.990 -999.990 1.630 ..P WKT 2010 12 08 10 59 55 31.3200 -97.3300 251.000 122.0 157.720 3.450 -999.990 -999.990 1.577 ..P WKT 2010 12 08 11 04 55 31.3200 -97.3300 251.000 457.0 147.959 2.750 -999.990 -999.990 1.480 ..P WKT 2010 12 08 11 09 55 31.3200 -97.3300 251.000 30.0 151.676 2.620 -999.990 -999.990 1.517 ..P WKT 2010 12 08 11 14 55 31.3200 -97.3300 251.000 122.0 151.485 2.860 -999.990 -999.990 1.515 ..P WKT 2010 12 08 11 19 55 31.3200 -97.3300 251.000 457.0 146.038 1.990 -999.990 -999.990 1.460 ..P WKT 2010 12 08 11 29 55 31.3200 -97.3300 251.000 30.0 143.897 2.310 -999.990 -999.990 1.439 ..P WKT 2010 12 08 11 34 55 31.3200 -97.3300 251.000 122.0 150.166 3.810 -999.990 -999.990 1.502 ..P WKT 2010 12 08 11 39 55 31.3200 -97.3300 251.000 457.0 154.818 3.720 -999.990 -999.990 1.548 ..P WKT 2010 12 08 11 44 55 31.3200 -97.3300 251.000 30.0 148.422 2.190 -999.990 -999.990 1.484 ..P WKT 2010 12 08 11 49 55 31.3200 -97.3300 251.000 122.0 149.167 4.120 -999.990 -999.990 1.492 ..P WKT 2010 12 08 12 09 55 31.3200 -97.3300 251.000 457.0 158.951 2.790 -999.990 -999.990 1.590 ..P WKT 2010 12 08 12 10 25 31.3200 -97.3300 251.000 457.0 155.751 3.070 -999.990 -999.990 1.558 ..P WKT 2010 12 08 12 10 55 31.3200 -97.3300 251.000 457.0 155.783 2.930 -999.990 -999.990 1.558 ..P WKT 2010 12 08 12 11 25 31.3200 -97.3300 251.000 457.0 152.583 3.700 -999.990 -999.990 1.526 ..P WKT 2010 12 08 12 11 55 31.3200 -97.3300 251.000 457.0 154.770 3.410 -999.990 -999.990 1.548 ..P WKT 2010 12 08 12 12 25 31.3200 -97.3300 251.000 457.0 152.917 2.970 -999.990 -999.990 1.529 ..P WKT 2010 12 08 12 12 55 31.3200 -97.3300 251.000 457.0 153.489 2.850 -999.990 -999.990 1.535 ..P WKT 2010 12 08 12 13 25 31.3200 -97.3300 251.000 457.0 151.366 2.740 -999.990 -999.990 1.514 ..P WKT 2010 12 08 12 13 55 31.3200 -97.3300 251.000 457.0 155.439 2.840 -999.990 -999.990 1.554 ..P WKT 2010 12 08 12 14 25 31.3200 -97.3300 251.000 457.0 155.202 2.790 -999.990 -999.990 1.552 ..P WKT 2010 12 08 12 14 55 31.3200 -97.3300 251.000 457.0 153.079 3.060 -999.990 -999.990 1.531 ..P WKT 2010 12 08 12 19 55 31.3200 -97.3300 251.000 30.0 149.094 3.080 -999.990 -999.990 1.491 ..P WKT 2010 12 08 12 24 55 31.3200 -97.3300 251.000 122.0 152.112 2.880 -999.990 -999.990 1.521 ..P WKT 2010 12 08 12 29 55 31.3200 -97.3300 251.000 457.0 149.742 4.410 -999.990 -999.990 1.497 ..P WKT 2010 12 08 12 34 55 31.3200 -97.3300 251.000 30.0 149.527 3.470 -999.990 -999.990 1.495 ..P WKT 2010 12 08 12 39 55 31.3200 -97.3300 251.000 122.0 152.545 3.200 -999.990 -999.990 1.525 ..P WKT 2010 12 08 12 44 55 31.3200 -97.3300 251.000 457.0 151.523 3.290 -999.990 -999.990 1.515 ..P WKT 2010 12 08 12 54 55 31.3200 -97.3300 251.000 30.0 152.728 3.120 -999.990 -999.990 1.527 ..P WKT 2010 12 08 12 59 55 31.3200 -97.3300 251.000 122.0 146.335 3.030 -999.990 -999.990 1.463 ..P WKT 2010 12 08 13 04 55 31.3200 -97.3300 251.000 457.0 156.642 3.150 -999.990 -999.990 1.566 ..P WKT 2010 12 08 13 09 55 31.3200 -97.3300 251.000 30.0 145.402 3.380 -999.990 -999.990 1.454 ..P WKT 2010 12 08 13 14 55 31.3200 -97.3300 251.000 122.0 147.090 2.980 -999.990 -999.990 1.471 ..P WKT 2010 12 08 13 19 55 31.3200 -97.3300 251.000 457.0 150.933 3.050 -999.990 -999.990 1.509 ..P WKT 2010 12 08 13 29 55 31.3200 -97.3300 251.000 30.0 144.729 3.370 -999.990 -999.990 1.447 ..P WKT 2010 12 08 13 34 55 31.3200 -97.3300 251.000 122.0 148.687 2.940 -999.990 -999.990 1.487 ..P WKT 2010 12 08 13 39 55 31.3200 -97.3300 251.000 457.0 153.452 3.220 -999.990 -999.990 1.535 ..P WKT 2010 12 08 13 44 55 31.3200 -97.3300 251.000 30.0 146.100 2.870 -999.990 -999.990 1.461 ..P WKT 2010 12 08 13 49 55 31.3200 -97.3300 251.000 122.0 153.827 3.080 -999.990 -999.990 1.538 ..P WKT 2010 12 08 13 54 55 31.3200 -97.3300 251.000 457.0 151.322 4.360 -999.990 -999.990 1.513 ..P WKT 2010 12 08 14 04 55 31.3200 -97.3300 251.000 30.0 150.081 2.750 -999.990 -999.990 1.501 ..P WKT 2010 12 08 14 09 55 31.3200 -97.3300 251.000 122.0 153.364 2.650 -999.990 -999.990 1.534 ..P WKT 2010 12 08 14 14 55 31.3200 -97.3300 251.000 457.0 140.898 3.280 -999.990 -999.990 1.409 ..P WKT 2010 12 08 14 19 55 31.3200 -97.3300 251.000 30.0 149.298 2.730 -999.990 -999.990 1.493 ..P WKT 2010 12 08 14 24 55 31.3200 -97.3300 251.000 122.0 150.696 2.970 -999.990 -999.990 1.507 ..P WKT 2010 12 08 14 29 55 31.3200 -97.3300 251.000 457.0 116.827 2.390 -999.990 -999.990 1.168 ..P WKT 2010 12 08 14 39 55 31.3200 -97.3300 251.000 30.0 157.258 2.130 -999.990 -999.990 1.573 ..P WKT 2010 12 08 14 44 55 31.3200 -97.3300 251.000 122.0 153.619 3.060 -999.990 -999.990 1.536 ..P WKT 2010 12 08 14 49 55 31.3200 -97.3300 251.000 457.0 123.868 3.330 -999.990 -999.990 1.239 ..P WKT 2010 12 08 14 54 55 31.3200 -97.3300 251.000 30.0 156.166 2.590 -999.990 -999.990 1.562 ..P WKT 2010 12 08 14 59 55 31.3200 -97.3300 251.000 122.0 149.298 3.000 -999.990 -999.990 1.493 ..P WKT 2010 12 08 15 04 55 31.3200 -97.3300 251.000 457.0 131.796 2.810 -999.990 -999.990 1.318 ..P WKT 2010 12 08 15 14 55 31.3200 -97.3300 251.000 30.0 144.265 2.700 -999.990 -999.990 1.443 ..P WKT 2010 12 08 15 19 55 31.3200 -97.3300 251.000 122.0 148.932 3.910 -999.990 -999.990 1.489 ..P WKT 2010 12 08 15 24 55 31.3200 -97.3300 251.000 457.0 128.971 2.620 -999.990 -999.990 1.290 ..P WKT 2010 12 08 15 29 55 31.3200 -97.3300 251.000 30.0 147.903 2.750 -999.990 -999.990 1.479 ..P WKT 2010 12 08 15 34 55 31.3200 -97.3300 251.000 122.0 148.936 3.240 -999.990 -999.990 1.489 ..P WKT 2010 12 08 15 39 55 31.3200 -97.3300 251.000 457.0 133.553 3.220 -999.990 -999.990 1.336 ..P WKT 2010 12 08 15 49 55 31.3200 -97.3300 251.000 30.0 139.138 2.710 -999.990 -999.990 1.391 ..P WKT 2010 12 08 15 54 55 31.3200 -97.3300 251.000 122.0 141.267 2.910 -999.990 -999.990 1.413 ..P WKT 2010 12 08 15 59 55 31.3200 -97.3300 251.000 457.0 135.592 3.070 -999.990 -999.990 1.356 ..P WKT 2010 12 08 16 04 55 31.3200 -97.3300 251.000 30.0 146.332 4.020 -999.990 -999.990 1.463 ..P WKT 2010 12 08 16 09 55 31.3200 -97.3300 251.000 122.0 146.308 3.780 -999.990 -999.990 1.463 ..P WKT 2010 12 08 16 14 55 31.3200 -97.3300 251.000 457.0 140.364 4.520 -999.990 -999.990 1.404 ..P WKT 2010 12 08 16 24 55 31.3200 -97.3300 251.000 30.0 136.530 4.080 -999.990 -999.990 1.365 ..P WKT 2010 12 08 16 29 55 31.3200 -97.3300 251.000 122.0 134.335 3.720 -999.990 -999.990 1.343 ..P WKT 2010 12 08 16 34 55 31.3200 -97.3300 251.000 457.0 144.785 3.010 -999.990 -999.990 1.448 ..P WKT 2010 12 08 16 39 55 31.3200 -97.3300 251.000 30.0 140.706 2.900 -999.990 -999.990 1.407 ..P WKT 2010 12 08 16 44 55 31.3200 -97.3300 251.000 122.0 139.318 2.800 -999.990 -999.990 1.393 ..P WKT 2010 12 08 16 49 55 31.3200 -97.3300 251.000 457.0 146.001 2.320 -999.990 -999.990 1.460 ..P WKT 2010 12 08 17 04 55 31.3200 -97.3300 251.000 30.0 139.290 3.060 -999.990 -999.990 1.393 ..P WKT 2010 12 08 17 09 55 31.3200 -97.3300 251.000 122.0 137.167 2.970 -999.990 -999.990 1.372 ..P WKT 2010 12 08 17 14 55 31.3200 -97.3300 251.000 457.0 133.430 2.750 -999.990 -999.990 1.334 ..P WKT 2010 12 08 17 19 55 31.3200 -97.3300 251.000 30.0 130.769 2.560 -999.990 -999.990 1.308 ..P WKT 2010 12 08 17 24 55 31.3200 -97.3300 251.000 122.0 138.599 3.230 -999.990 -999.990 1.386 ..P WKT 2010 12 08 17 29 55 31.3200 -97.3300 251.000 457.0 131.634 2.480 -999.990 -999.990 1.316 ..P WKT 2010 12 08 17 39 55 31.3200 -97.3300 251.000 30.0 131.890 4.030 -999.990 -999.990 1.319 ..P WKT 2010 12 08 17 44 55 31.3200 -97.3300 251.000 122.0 134.268 4.040 -999.990 -999.990 1.343 ..P WKT 2010 12 08 17 49 55 31.3200 -97.3300 251.000 457.0 135.032 3.540 -999.990 -999.990 1.350 ..P WKT 2010 12 08 17 54 55 31.3200 -97.3300 251.000 30.0 136.333 4.140 -999.990 -999.990 1.363 ..P WKT 2010 12 08 17 59 55 31.3200 -97.3300 251.000 122.0 141.535 4.510 -999.990 -999.990 1.415 ..P WKT 2010 12 08 18 04 55 31.3200 -97.3300 251.000 457.0 135.172 4.300 -999.990 -999.990 1.352 ..P WKT 2010 12 08 18 14 55 31.3200 -97.3300 251.000 30.0 136.028 3.740 -999.990 -999.990 1.360 ..P WKT 2010 12 08 18 19 55 31.3200 -97.3300 251.000 122.0 140.287 3.350 -999.990 -999.990 1.403 ..P WKT 2010 12 08 18 24 55 31.3200 -97.3300 251.000 457.0 137.824 3.530 -999.990 -999.990 1.378 ..P WKT 2010 12 08 18 29 55 31.3200 -97.3300 251.000 30.0 137.646 3.470 -999.990 -999.990 1.376 ..P WKT 2010 12 08 18 34 55 31.3200 -97.3300 251.000 122.0 135.856 3.190 -999.990 -999.990 1.359 ..P WKT 2010 12 08 18 39 55 31.3200 -97.3300 251.000 457.0 137.157 2.940 -999.990 -999.990 1.372 ..P WKT 2010 12 08 18 49 55 31.3200 -97.3300 251.000 30.0 134.709 2.290 -999.990 -999.990 1.347 ..P WKT 2010 12 08 18 54 55 31.3200 -97.3300 251.000 122.0 135.665 2.720 -999.990 -999.990 1.357 ..P WKT 2010 12 08 18 59 55 31.3200 -97.3300 251.000 457.0 138.502 3.040 -999.990 -999.990 1.385 ..P WKT 2010 12 08 19 04 55 31.3200 -97.3300 251.000 30.0 135.022 3.640 -999.990 -999.990 1.350 ..P WKT 2010 12 08 19 09 55 31.3200 -97.3300 251.000 122.0 132.080 3.550 -999.990 -999.990 1.321 ..P WKT 2010 12 08 19 14 55 31.3200 -97.3300 251.000 457.0 140.831 3.820 -999.990 -999.990 1.408 ..P WKT 2010 12 08 19 24 55 31.3200 -97.3300 251.000 30.0 141.436 3.440 -999.990 -999.990 1.414 ..P WKT 2010 12 08 19 29 55 31.3200 -97.3300 251.000 122.0 141.221 3.110 -999.990 -999.990 1.412 ..P WKT 2010 12 08 19 34 55 31.3200 -97.3300 251.000 457.0 137.914 3.440 -999.990 -999.990 1.379 ..P WKT 2010 12 08 19 39 55 31.3200 -97.3300 251.000 30.0 139.983 3.720 -999.990 -999.990 1.400 ..P WKT 2010 12 08 19 44 55 31.3200 -97.3300 251.000 122.0 139.767 4.800 -999.990 -999.990 1.398 ..P WKT 2010 12 08 19 49 55 31.3200 -97.3300 251.000 457.0 140.224 4.700 -999.990 -999.990 1.402 ..P WKT 2010 12 08 19 59 55 31.3200 -97.3300 251.000 30.0 146.895 3.940 -999.990 -999.990 1.469 ..P WKT 2010 12 08 20 04 55 31.3200 -97.3300 251.000 122.0 141.822 4.290 -999.990 -999.990 1.418 ..P WKT 2010 12 08 20 09 55 31.3200 -97.3300 251.000 457.0 142.393 3.260 -999.990 -999.990 1.424 ..P WKT 2010 12 08 20 14 55 31.3200 -97.3300 251.000 30.0 145.921 3.240 -999.990 -999.990 1.459 ..P WKT 2010 12 08 20 19 55 31.3200 -97.3300 251.000 122.0 145.148 4.040 -999.990 -999.990 1.451 ..P WKT 2010 12 08 20 24 55 31.3200 -97.3300 251.000 457.0 142.763 3.060 -999.990 -999.990 1.428 ..P WKT 2010 12 08 20 34 55 31.3200 -97.3300 251.000 30.0 142.101 3.250 -999.990 -999.990 1.421 ..P WKT 2010 12 08 20 39 55 31.3200 -97.3300 251.000 122.0 141.674 2.270 -999.990 -999.990 1.417 ..P WKT 2010 12 08 20 44 55 31.3200 -97.3300 251.000 457.0 142.322 2.640 -999.990 -999.990 1.423 ..P WKT 2010 12 08 20 49 55 31.3200 -97.3300 251.000 30.0 147.001 2.740 -999.990 -999.990 1.470 ..P WKT 2010 12 08 20 54 55 31.3200 -97.3300 251.000 122.0 149.530 2.800 -999.990 -999.990 1.495 ..P WKT 2010 12 08 20 59 55 31.3200 -97.3300 251.000 457.0 142.117 2.040 -999.990 -999.990 1.421 ..P WKT 2010 12 08 21 09 55 31.3200 -97.3300 251.000 30.0 144.986 3.480 -999.990 -999.990 1.450 ..P WKT 2010 12 08 21 14 55 31.3200 -97.3300 251.000 122.0 151.506 2.940 -999.990 -999.990 1.515 ..P WKT 2010 12 08 21 19 55 31.3200 -97.3300 251.000 457.0 144.055 3.780 -999.990 -999.990 1.441 ..P WKT 2010 12 08 21 24 55 31.3200 -97.3300 251.000 30.0 137.411 4.560 -999.990 -999.990 1.374 ..P WKT 2010 12 08 21 29 55 31.3200 -97.3300 251.000 122.0 141.244 4.180 -999.990 -999.990 1.412 ..P WKT 2010 12 08 21 34 55 31.3200 -97.3300 251.000 457.0 141.316 3.280 -999.990 -999.990 1.413 ..P WKT 2010 12 08 21 44 55 31.3200 -97.3300 251.000 30.0 141.115 3.190 -999.990 -999.990 1.411 ..P WKT 2010 12 08 21 49 55 31.3200 -97.3300 251.000 122.0 144.871 4.790 -999.990 -999.990 1.449 ..P WKT 2010 12 08 21 54 55 31.3200 -97.3300 251.000 457.0 151.850 4.950 -999.990 -999.990 1.518 ..P WKT 2010 12 08 21 59 55 31.3200 -97.3300 251.000 30.0 151.039 6.320 -999.990 -999.990 1.510 ..P WKT 2010 12 08 22 04 55 31.3200 -97.3300 251.000 122.0 153.049 5.800 -999.990 -999.990 1.530 ..P WKT 2010 12 08 22 09 55 31.3200 -97.3300 251.000 457.0 154.387 4.540 -999.990 -999.990 1.544 ..P WKT 2010 12 08 22 19 55 31.3200 -97.3300 251.000 30.0 151.423 4.130 -999.990 -999.990 1.514 ..P WKT 2010 12 08 22 24 55 31.3200 -97.3300 251.000 122.0 151.418 5.320 -999.990 -999.990 1.514 ..P WKT 2010 12 08 22 29 55 31.3200 -97.3300 251.000 457.0 149.265 5.890 -999.990 -999.990 1.493 ..P WKT 2010 12 08 22 34 55 31.3200 -97.3300 251.000 30.0 147.245 4.520 -999.990 -999.990 1.472 ..P WKT 2010 12 08 22 39 55 31.3200 -97.3300 251.000 122.0 146.301 3.610 -999.990 -999.990 1.463 ..P WKT 2010 12 08 22 44 55 31.3200 -97.3300 251.000 457.0 143.611 3.740 -999.990 -999.990 1.436 ..P WKT 2010 12 08 22 54 55 31.3200 -97.3300 251.000 30.0 146.651 2.630 -999.990 -999.990 1.467 ..P WKT 2010 12 08 22 59 55 31.3200 -97.3300 251.000 122.0 142.043 3.410 -999.990 -999.990 1.420 ..P WKT 2010 12 08 23 04 55 31.3200 -97.3300 251.000 457.0 145.088 3.210 -999.990 -999.990 1.451 ..P WKT 2010 12 08 23 09 55 31.3200 -97.3300 251.000 30.0 142.897 3.450 -999.990 -999.990 1.429 ..P WKT 2010 12 08 23 14 55 31.3200 -97.3300 251.000 122.0 140.034 3.380 -999.990 -999.990 1.400 ..P WKT 2010 12 08 23 19 55 31.3200 -97.3300 251.000 457.0 144.824 2.300 -999.990 -999.990 1.448 ..P WKT 2010 12 08 23 29 55 31.3200 -97.3300 251.000 30.0 142.646 3.000 -999.990 -999.990 1.426 ..P WKT 2010 12 08 23 34 55 31.3200 -97.3300 251.000 122.0 147.356 3.520 -999.990 -999.990 1.474 ..P WKT 2010 12 08 23 39 55 31.3200 -97.3300 251.000 457.0 146.428 2.720 -999.990 -999.990 1.464 ..P WKT 2010 12 08 23 44 55 31.3200 -97.3300 251.000 30.0 148.723 4.630 -999.990 -999.990 1.487 ..P WKT 2010 12 08 23 49 55 31.3200 -97.3300 251.000 122.0 147.929 3.900 -999.990 -999.990 1.479 ..P WKT 2010 12 09 00 09 55 31.3200 -97.3300 251.000 457.0 137.180 3.630 -999.990 -999.990 1.372 ..P WKT 2010 12 09 00 10 25 31.3200 -97.3300 251.000 457.0 135.485 2.900 -999.990 -999.990 1.355 ..P WKT 2010 12 09 00 10 55 31.3200 -97.3300 251.000 457.0 134.058 2.930 -999.990 -999.990 1.341 ..P WKT 2010 12 09 00 11 25 31.3200 -97.3300 251.000 457.0 136.659 3.020 -999.990 -999.990 1.367 ..P WKT 2010 12 09 00 11 55 31.3200 -97.3300 251.000 457.0 136.574 3.030 -999.990 -999.990 1.366 ..P WKT 2010 12 09 00 12 25 31.3200 -97.3300 251.000 457.0 136.490 2.960 -999.990 -999.990 1.365 ..P WKT 2010 12 09 00 12 55 31.3200 -97.3300 251.000 457.0 135.600 2.890 -999.990 -999.990 1.356 ..P WKT 2010 12 09 00 13 25 31.3200 -97.3300 251.000 457.0 133.368 2.940 -999.990 -999.990 1.334 ..P WKT 2010 12 09 00 13 55 31.3200 -97.3300 251.000 457.0 138.653 3.820 -999.990 -999.990 1.387 ..P WKT 2010 12 09 00 14 25 31.3200 -97.3300 251.000 457.0 137.763 3.000 -999.990 -999.990 1.378 ..P WKT 2010 12 09 00 14 55 31.3200 -97.3300 251.000 457.0 134.189 3.200 -999.990 -999.990 1.342 ..P WKT 2010 12 09 00 19 55 31.3200 -97.3300 251.000 30.0 143.546 3.270 -999.990 -999.990 1.435 ..P WKT 2010 12 09 00 24 55 31.3200 -97.3300 251.000 122.0 143.776 3.810 -999.990 -999.990 1.438 ..P WKT 2010 12 09 00 29 55 31.3200 -97.3300 251.000 457.0 131.121 5.030 -999.990 -999.990 1.311 ..P WKT 2010 12 09 00 34 55 31.3200 -97.3300 251.000 30.0 146.384 4.070 -999.990 -999.990 1.464 ..P WKT 2010 12 09 00 39 55 31.3200 -97.3300 251.000 122.0 145.272 3.630 -999.990 -999.990 1.453 ..P WKT 2010 12 09 00 44 55 31.3200 -97.3300 251.000 457.0 133.423 4.210 -999.990 -999.990 1.334 ..P WKT 2010 12 09 00 54 55 31.3200 -97.3300 251.000 30.0 150.671 4.320 -999.990 -999.990 1.507 ..P WKT 2010 12 09 00 59 55 31.3200 -97.3300 251.000 122.0 145.678 4.180 -999.990 -999.990 1.457 ..P WKT 2010 12 09 01 04 55 31.3200 -97.3300 251.000 457.0 131.019 4.420 -999.990 -999.990 1.310 ..P WKT 2010 12 09 01 09 55 31.3200 -97.3300 251.000 30.0 150.186 3.670 -999.990 -999.990 1.502 ..P WKT 2010 12 09 01 14 55 31.3200 -97.3300 251.000 122.0 152.977 3.520 -999.990 -999.990 1.530 ..P WKT 2010 12 09 01 19 55 31.3200 -97.3300 251.000 457.0 135.366 3.360 -999.990 -999.990 1.354 ..P WKT 2010 12 09 01 29 55 31.3200 -97.3300 251.000 30.0 148.447 4.240 -999.990 -999.990 1.484 ..P WKT 2010 12 09 01 34 55 31.3200 -97.3300 251.000 122.0 160.077 3.930 -999.990 -999.990 1.601 ..P WKT 2010 12 09 01 39 55 31.3200 -97.3300 251.000 457.0 139.628 5.450 -999.990 -999.990 1.396 ..P WKT 2010 12 09 01 44 55 31.3200 -97.3300 251.000 30.0 144.950 4.180 -999.990 -999.990 1.450 ..P WKT 2010 12 09 01 49 55 31.3200 -97.3300 251.000 122.0 155.104 4.690 -999.990 -999.990 1.551 ..P WKT 2010 12 09 01 54 55 31.3200 -97.3300 251.000 457.0 136.535 4.730 -999.990 -999.990 1.365 ..P WKT 2010 12 09 02 04 55 31.3200 -97.3300 251.000 30.0 146.911 4.930 -999.990 -999.990 1.469 ..P WKT 2010 12 09 02 09 55 31.3200 -97.3300 251.000 122.0 149.146 4.580 -999.990 -999.990 1.491 ..P WKT 2010 12 09 02 14 55 31.3200 -97.3300 251.000 457.0 133.127 4.440 -999.990 -999.990 1.331 ..P WKT 2010 12 09 02 19 55 31.3200 -97.3300 251.000 30.0 142.744 4.400 -999.990 -999.990 1.427 ..P WKT 2010 12 09 02 24 55 31.3200 -97.3300 251.000 122.0 142.831 3.540 -999.990 -999.990 1.428 ..P WKT 2010 12 09 02 29 55 31.3200 -97.3300 251.000 457.0 136.744 3.330 -999.990 -999.990 1.367 ..P WKT 2010 12 09 02 39 55 31.3200 -97.3300 251.000 30.0 140.659 3.000 -999.990 -999.990 1.407 ..P WKT 2010 12 09 02 44 55 31.3200 -97.3300 251.000 122.0 141.532 4.200 -999.990 -999.990 1.415 ..P WKT 2010 12 09 02 49 55 31.3200 -97.3300 251.000 457.0 150.862 4.590 -999.990 -999.990 1.509 ..P WKT 2010 12 09 02 54 55 31.3200 -97.3300 251.000 30.0 137.777 3.780 -999.990 -999.990 1.378 ..P WKT 2010 12 09 02 59 55 31.3200 -97.3300 251.000 122.0 143.079 3.940 -999.990 -999.990 1.431 ..P WKT 2010 12 09 03 04 55 31.3200 -97.3300 251.000 457.0 132.678 4.510 -999.990 -999.990 1.327 ..P WKT 2010 12 09 03 14 55 31.3200 -97.3300 251.000 30.0 128.040 4.440 -999.990 -999.990 1.280 ..P WKT 2010 12 09 03 19 55 31.3200 -97.3300 251.000 122.0 138.233 5.390 -999.990 -999.990 1.382 ..P WKT 2010 12 09 03 24 55 31.3200 -97.3300 251.000 457.0 127.889 3.900 -999.990 -999.990 1.279 ..P WKT 2010 12 09 03 29 55 31.3200 -97.3300 251.000 30.0 136.069 3.420 -999.990 -999.990 1.361 ..P WKT 2010 12 09 03 34 55 31.3200 -97.3300 251.000 122.0 135.389 3.120 -999.990 -999.990 1.354 ..P WKT 2010 12 09 03 39 55 31.3200 -97.3300 251.000 457.0 136.589 3.680 -999.990 -999.990 1.366 ..P WKT 2010 12 09 03 49 55 31.3200 -97.3300 251.000 30.0 131.893 2.760 -999.990 -999.990 1.319 ..P WKT 2010 12 09 03 54 55 31.3200 -97.3300 251.000 122.0 130.696 3.770 -999.990 -999.990 1.307 ..P WKT 2010 12 09 03 59 55 31.3200 -97.3300 251.000 457.0 132.989 3.210 -999.990 -999.990 1.330 ..P WKT 2010 12 09 04 04 55 31.3200 -97.3300 251.000 30.0 125.618 4.010 -999.990 -999.990 1.256 ..P WKT 2010 12 09 04 09 55 31.3200 -97.3300 251.000 122.0 132.474 3.580 -999.990 -999.990 1.325 ..P WKT 2010 12 09 04 14 55 31.3200 -97.3300 251.000 457.0 126.713 3.850 -999.990 -999.990 1.267 ..P WKT 2010 12 09 04 24 55 31.3200 -97.3300 251.000 30.0 141.997 4.320 -999.990 -999.990 1.420 ..P WKT 2010 12 09 04 29 55 31.3200 -97.3300 251.000 122.0 129.218 3.650 -999.990 -999.990 1.292 ..P WKT 2010 12 09 04 34 55 31.3200 -97.3300 251.000 457.0 129.594 3.220 -999.990 -999.990 1.296 ..P WKT 2010 12 09 04 39 55 31.3200 -97.3300 251.000 30.0 133.728 2.850 -999.990 -999.990 1.337 ..P WKT 2010 12 09 04 44 55 31.3200 -97.3300 251.000 122.0 125.781 3.250 -999.990 -999.990 1.258 ..P WKT 2010 12 09 04 49 55 31.3200 -97.3300 251.000 457.0 127.229 2.560 -999.990 -999.990 1.272 ..P WKT 2010 12 09 05 04 55 31.3200 -97.3300 251.000 30.0 123.326 2.820 -999.990 -999.990 1.233 ..P WKT 2010 12 09 05 09 55 31.3200 -97.3300 251.000 122.0 126.824 4.660 -999.990 -999.990 1.268 ..P WKT 2010 12 09 05 14 55 31.3200 -97.3300 251.000 457.0 131.128 3.010 -999.990 -999.990 1.311 ..P WKT 2010 12 09 05 19 55 31.3200 -97.3300 251.000 30.0 125.230 3.200 -999.990 -999.990 1.252 ..P WKT 2010 12 09 05 24 55 31.3200 -97.3300 251.000 122.0 122.553 2.660 -999.990 -999.990 1.226 ..P WKT 2010 12 09 05 29 55 31.3200 -97.3300 251.000 457.0 134.374 2.680 -999.990 -999.990 1.344 ..P WKT 2010 12 09 05 39 55 31.3200 -97.3300 251.000 30.0 136.407 3.020 -999.990 -999.990 1.364 ..P WKT 2010 12 09 05 44 55 31.3200 -97.3300 251.000 122.0 122.995 3.240 -999.990 -999.990 1.230 ..P WKT 2010 12 09 05 49 55 31.3200 -97.3300 251.000 457.0 132.133 3.480 -999.990 -999.990 1.321 ..P WKT 2010 12 09 05 54 55 31.3200 -97.3300 251.000 30.0 137.513 3.530 -999.990 -999.990 1.375 ..P WKT 2010 12 09 05 59 55 31.3200 -97.3300 251.000 122.0 121.819 3.180 -999.990 -999.990 1.218 ..P WKT 2010 12 09 06 04 55 31.3200 -97.3300 251.000 457.0 135.118 4.010 -999.990 -999.990 1.351 ..P WKT 2010 12 09 06 14 55 31.3200 -97.3300 251.000 30.0 143.366 4.780 -999.990 -999.990 1.434 ..P WKT 2010 12 09 06 19 55 31.3200 -97.3300 251.000 122.0 132.677 2.800 -999.990 -999.990 1.327 ..P WKT 2010 12 09 06 24 55 31.3200 -97.3300 251.000 457.0 138.632 3.710 -999.990 -999.990 1.386 ..P WKT 2010 12 09 06 29 55 31.3200 -97.3300 251.000 30.0 150.359 3.650 -999.990 -999.990 1.504 ..P WKT 2010 12 09 06 34 55 31.3200 -97.3300 251.000 122.0 146.247 3.550 -999.990 -999.990 1.462 ..P WKT 2010 12 09 06 39 55 31.3200 -97.3300 251.000 457.0 146.162 3.650 -999.990 -999.990 1.462 ..P WKT 2010 12 09 06 49 55 31.3200 -97.3300 251.000 30.0 150.574 3.320 -999.990 -999.990 1.506 ..P WKT 2010 12 09 06 54 55 31.3200 -97.3300 251.000 122.0 147.153 3.300 -999.990 -999.990 1.472 ..P WKT 2010 12 09 06 59 55 31.3200 -97.3300 251.000 457.0 140.510 3.460 -999.990 -999.990 1.405 ..P WKT 2010 12 09 07 04 55 31.3200 -97.3300 251.000 30.0 157.357 2.970 -999.990 -999.990 1.574 ..P WKT 2010 12 09 07 09 55 31.3200 -97.3300 251.000 122.0 148.029 3.120 -999.990 -999.990 1.480 ..P WKT 2010 12 09 07 14 55 31.3200 -97.3300 251.000 457.0 139.104 3.600 -999.990 -999.990 1.391 ..P WKT 2010 12 09 07 24 55 31.3200 -97.3300 251.000 30.0 149.557 3.230 -999.990 -999.990 1.496 ..P WKT 2010 12 09 07 29 55 31.3200 -97.3300 251.000 122.0 147.995 3.220 -999.990 -999.990 1.480 ..P WKT 2010 12 09 07 34 55 31.3200 -97.3300 251.000 457.0 141.065 2.680 -999.990 -999.990 1.411 ..P WKT 2010 12 09 07 39 55 31.3200 -97.3300 251.000 30.0 151.986 3.160 -999.990 -999.990 1.520 ..P WKT 2010 12 09 07 44 55 31.3200 -97.3300 251.000 122.0 142.506 4.480 -999.990 -999.990 1.425 ..P WKT 2010 12 09 07 49 55 31.3200 -97.3300 251.000 457.0 138.931 2.790 -999.990 -999.990 1.389 ..P WKT 2010 12 09 07 59 55 31.3200 -97.3300 251.000 30.0 150.726 3.230 -999.990 -999.990 1.507 ..P WKT 2010 12 09 08 04 55 31.3200 -97.3300 251.000 122.0 149.452 2.700 -999.990 -999.990 1.495 ..P WKT 2010 12 09 08 09 55 31.3200 -97.3300 251.000 457.0 139.051 2.830 -999.990 -999.990 1.391 ..P WKT 2010 12 09 08 14 55 31.3200 -97.3300 251.000 30.0 146.367 5.100 -999.990 -999.990 1.464 ..P WKT 2010 12 09 08 19 55 31.3200 -97.3300 251.000 122.0 137.845 2.760 -999.990 -999.990 1.378 ..P WKT 2010 12 09 08 24 55 31.3200 -97.3300 251.000 457.0 136.840 2.570 -999.990 -999.990 1.368 ..P WKT 2010 12 09 08 34 55 31.3200 -97.3300 251.000 30.0 149.593 4.160 -999.990 -999.990 1.496 ..P WKT 2010 12 09 08 39 55 31.3200 -97.3300 251.000 122.0 147.513 3.020 -999.990 -999.990 1.475 ..P WKT 2010 12 09 08 44 55 31.3200 -97.3300 251.000 457.0 137.918 3.880 -999.990 -999.990 1.379 ..P WKT 2010 12 09 08 49 55 31.3200 -97.3300 251.000 30.0 142.550 3.630 -999.990 -999.990 1.426 ..P WKT 2010 12 09 08 54 55 31.3200 -97.3300 251.000 122.0 144.766 4.030 -999.990 -999.990 1.448 ..P WKT 2010 12 09 08 59 55 31.3200 -97.3300 251.000 457.0 146.176 4.720 -999.990 -999.990 1.462 ..P WKT 2010 12 09 09 09 55 31.3200 -97.3300 251.000 30.0 149.707 6.200 -999.990 -999.990 1.497 ..P WKT 2010 12 09 09 14 55 31.3200 -97.3300 251.000 122.0 146.726 4.200 -999.990 -999.990 1.467 ..P WKT 2010 12 09 09 19 55 31.3200 -97.3300 251.000 457.0 137.840 5.050 -999.990 -999.990 1.378 ..P WKT 2010 12 09 09 24 55 31.3200 -97.3300 251.000 30.0 148.550 4.450 -999.990 -999.990 1.486 ..P WKT 2010 12 09 09 29 55 31.3200 -97.3300 251.000 122.0 135.369 4.690 -999.990 -999.990 1.354 ..P WKT 2010 12 09 09 34 55 31.3200 -97.3300 251.000 457.0 139.100 3.190 -999.990 -999.990 1.391 ..P WKT 2010 12 09 09 44 55 31.3200 -97.3300 251.000 30.0 143.512 3.710 -999.990 -999.990 1.435 ..P WKT 2010 12 09 09 49 55 31.3200 -97.3300 251.000 122.0 140.973 3.940 -999.990 -999.990 1.410 ..P WKT 2010 12 09 09 54 55 31.3200 -97.3300 251.000 457.0 140.313 4.390 -999.990 -999.990 1.403 ..P WKT 2010 12 09 09 59 55 31.3200 -97.3300 251.000 30.0 141.263 4.360 -999.990 -999.990 1.413 ..P WKT 2010 12 09 10 04 55 31.3200 -97.3300 251.000 122.0 146.374 4.270 -999.990 -999.990 1.464 ..P WKT 2010 12 09 10 09 55 31.3200 -97.3300 251.000 457.0 145.311 3.420 -999.990 -999.990 1.453 ..P WKT 2010 12 09 10 19 55 31.3200 -97.3300 251.000 30.0 146.905 4.100 -999.990 -999.990 1.469 ..P WKT 2010 12 09 10 24 55 31.3200 -97.3300 251.000 122.0 139.227 4.300 -999.990 -999.990 1.392 ..P WKT 2010 12 09 10 29 55 31.3200 -97.3300 251.000 457.0 154.635 4.430 -999.990 -999.990 1.546 ..P WKT 2010 12 09 10 34 55 31.3200 -97.3300 251.000 30.0 143.869 3.890 -999.990 -999.990 1.439 ..P WKT 2010 12 09 10 39 55 31.3200 -97.3300 251.000 122.0 138.339 3.640 -999.990 -999.990 1.383 ..P WKT 2010 12 09 10 44 55 31.3200 -97.3300 251.000 457.0 165.961 4.770 -999.990 -999.990 1.660 ..P WKT 2010 12 09 10 54 55 31.3200 -97.3300 251.000 30.0 145.849 4.340 -999.990 -999.990 1.458 ..P WKT 2010 12 09 10 59 55 31.3200 -97.3300 251.000 122.0 135.295 4.220 -999.990 -999.990 1.353 ..P WKT 2010 12 09 11 04 55 31.3200 -97.3300 251.000 457.0 150.243 5.100 -999.990 -999.990 1.502 ..P WKT 2010 12 09 11 09 55 31.3200 -97.3300 251.000 30.0 141.433 4.050 -999.990 -999.990 1.414 ..P WKT 2010 12 09 11 14 55 31.3200 -97.3300 251.000 122.0 136.247 5.220 -999.990 -999.990 1.362 ..P WKT 2010 12 09 11 19 55 31.3200 -97.3300 251.000 457.0 145.021 4.180 -999.990 -999.990 1.450 ..P WKT 2010 12 09 11 29 55 31.3200 -97.3300 251.000 30.0 144.273 4.060 -999.990 -999.990 1.443 ..P WKT 2010 12 09 11 34 55 31.3200 -97.3300 251.000 122.0 141.060 4.040 -999.990 -999.990 1.411 ..P WKT 2010 12 09 11 39 55 31.3200 -97.3300 251.000 457.0 137.982 3.590 -999.990 -999.990 1.380 ..P WKT 2010 12 09 11 44 55 31.3200 -97.3300 251.000 30.0 147.788 3.880 -999.990 -999.990 1.478 ..P WKT 2010 12 09 11 49 55 31.3200 -97.3300 251.000 122.0 141.757 4.030 -999.990 -999.990 1.418 ..P WKT 2010 12 09 12 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 10 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 10 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 11 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 11 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 12 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 12 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 13 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 13 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 14 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 12 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 13 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 13 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 13 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 13 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 13 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 13 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 13 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 13 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 13 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 13 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 14 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 14 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 14 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 14 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 14 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 14 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 14 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 14 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 14 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 14 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 14 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 15 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 15 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 15 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 15 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 15 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 15 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 15 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 15 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 15 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 15 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 16 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 16 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 16 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 16 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 16 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 16 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 16 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 16 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 16 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 17 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 17 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 17 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 17 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 17 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 17 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 17 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 17 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 17 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 17 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 17 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 18 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 18 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 18 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 18 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 18 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 18 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 18 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 18 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 18 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 18 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 19 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 19 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 19 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 19 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 19 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 19 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 19 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 19 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 19 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 19 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 20 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 20 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 20 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 20 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 20 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 20 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 20 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 20 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 20 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 20 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 20 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 21 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 21 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 21 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 21 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 21 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 21 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 21 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 21 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 21 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 21 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 22 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 22 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 22 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 22 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 22 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 22 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 22 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 22 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 22 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 22 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 23 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 23 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 23 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 23 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 23 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 23 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 23 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 23 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 09 23 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 C.P WKT 2010 12 11 00 09 55 31.3200 -97.3300 251.000 457.0 137.010 4.620 -999.990 -999.990 1.370 ..P WKT 2010 12 11 00 10 25 31.3200 -97.3300 251.000 457.0 138.564 4.860 -999.990 -999.990 1.386 ..P WKT 2010 12 11 00 10 55 31.3200 -97.3300 251.000 457.0 139.580 4.490 -999.990 -999.990 1.396 ..P WKT 2010 12 11 00 11 25 31.3200 -97.3300 251.000 457.0 143.553 4.830 -999.990 -999.990 1.436 ..P WKT 2010 12 11 00 11 55 31.3200 -97.3300 251.000 457.0 137.850 5.950 -999.990 -999.990 1.379 ..P WKT 2010 12 11 00 12 25 31.3200 -97.3300 251.000 457.0 139.136 6.610 -999.990 -999.990 1.391 ..P WKT 2010 12 11 00 12 55 31.3200 -97.3300 251.000 457.0 139.883 4.790 -999.990 -999.990 1.399 ..P WKT 2010 12 11 00 13 25 31.3200 -97.3300 251.000 457.0 140.899 4.800 -999.990 -999.990 1.409 ..P WKT 2010 12 11 00 13 55 31.3200 -97.3300 251.000 457.0 138.422 4.820 -999.990 -999.990 1.384 ..P WKT 2010 12 11 00 14 25 31.3200 -97.3300 251.000 457.0 144.410 4.990 -999.990 -999.990 1.444 ..P WKT 2010 12 11 00 14 55 31.3200 -97.3300 251.000 457.0 144.755 4.590 -999.990 -999.990 1.448 ..P WKT 2010 12 11 00 19 55 31.3200 -97.3300 251.000 30.0 151.557 5.740 -999.990 -999.990 1.516 ..P WKT 2010 12 11 00 24 55 31.3200 -97.3300 251.000 122.0 142.639 5.900 -999.990 -999.990 1.426 ..P WKT 2010 12 11 00 29 55 31.3200 -97.3300 251.000 457.0 132.919 5.060 -999.990 -999.990 1.329 ..P WKT 2010 12 11 00 34 55 31.3200 -97.3300 251.000 30.0 152.476 4.890 -999.990 -999.990 1.525 ..P WKT 2010 12 11 00 39 55 31.3200 -97.3300 251.000 122.0 143.429 5.240 -999.990 -999.990 1.434 ..P WKT 2010 12 11 00 44 55 31.3200 -97.3300 251.000 457.0 146.198 5.290 -999.990 -999.990 1.462 ..P WKT 2010 12 11 00 54 55 31.3200 -97.3300 251.000 30.0 157.341 5.370 -999.990 -999.990 1.573 ..P WKT 2010 12 11 00 59 55 31.3200 -97.3300 251.000 122.0 151.492 4.930 -999.990 -999.990 1.515 ..P WKT 2010 12 11 01 04 55 31.3200 -97.3300 251.000 457.0 139.876 5.020 -999.990 -999.990 1.399 ..P WKT 2010 12 11 01 09 55 31.3200 -97.3300 251.000 30.0 148.785 4.710 -999.990 -999.990 1.488 ..P WKT 2010 12 11 01 14 55 31.3200 -97.3300 251.000 122.0 147.231 4.610 -999.990 -999.990 1.472 ..P WKT 2010 12 11 01 19 55 31.3200 -97.3300 251.000 457.0 142.058 5.670 -999.990 -999.990 1.421 ..P WKT 2010 12 11 01 29 55 31.3200 -97.3300 251.000 30.0 151.170 5.070 -999.990 -999.990 1.512 ..P WKT 2010 12 11 01 34 55 31.3200 -97.3300 251.000 122.0 134.896 4.500 -999.990 -999.990 1.349 ..P WKT 2010 12 11 01 39 55 31.3200 -97.3300 251.000 457.0 146.629 4.540 -999.990 -999.990 1.466 ..P WKT 2010 12 11 01 44 55 31.3200 -97.3300 251.000 30.0 148.177 4.850 -999.990 -999.990 1.482 ..P WKT 2010 12 11 01 49 55 31.3200 -97.3300 251.000 122.0 141.957 4.830 -999.990 -999.990 1.420 ..P WKT 2010 12 11 01 54 55 31.3200 -97.3300 251.000 457.0 151.138 4.640 -999.990 -999.990 1.511 ..P WKT 2010 12 11 02 04 55 31.3200 -97.3300 251.000 30.0 144.211 4.790 -999.990 -999.990 1.442 ..P WKT 2010 12 11 02 09 55 31.3200 -97.3300 251.000 122.0 135.472 4.670 -999.990 -999.990 1.355 ..P WKT 2010 12 11 02 14 55 31.3200 -97.3300 251.000 457.0 141.991 4.810 -999.990 -999.990 1.420 ..P WKT 2010 12 11 02 19 55 31.3200 -97.3300 251.000 30.0 144.092 4.440 -999.990 -999.990 1.441 ..P WKT 2010 12 11 02 24 55 31.3200 -97.3300 251.000 122.0 136.027 4.420 -999.990 -999.990 1.360 ..P WKT 2010 12 11 02 29 55 31.3200 -97.3300 251.000 457.0 137.861 5.480 -999.990 -999.990 1.379 ..P WKT 2010 12 11 02 39 55 31.3200 -97.3300 251.000 30.0 138.644 4.700 -999.990 -999.990 1.386 ..P WKT 2010 12 11 02 44 55 31.3200 -97.3300 251.000 122.0 136.791 4.780 -999.990 -999.990 1.368 ..P WKT 2010 12 11 02 49 55 31.3200 -97.3300 251.000 457.0 129.861 4.500 -999.990 -999.990 1.299 ..P WKT 2010 12 11 02 54 55 31.3200 -97.3300 251.000 30.0 144.847 4.380 -999.990 -999.990 1.448 ..P WKT 2010 12 11 02 59 55 31.3200 -97.3300 251.000 122.0 136.314 5.020 -999.990 -999.990 1.363 ..P WKT 2010 12 11 03 04 55 31.3200 -97.3300 251.000 457.0 128.853 4.570 -999.990 -999.990 1.289 ..P WKT 2010 12 11 03 14 55 31.3200 -97.3300 251.000 30.0 135.113 4.700 -999.990 -999.990 1.351 ..P WKT 2010 12 11 03 19 55 31.3200 -97.3300 251.000 122.0 129.868 5.280 -999.990 -999.990 1.299 ..P WKT 2010 12 11 03 24 55 31.3200 -97.3300 251.000 457.0 127.028 4.890 -999.990 -999.990 1.270 ..P WKT 2010 12 11 03 29 55 31.3200 -97.3300 251.000 30.0 134.599 4.680 -999.990 -999.990 1.346 ..P WKT 2010 12 11 03 34 55 31.3200 -97.3300 251.000 122.0 130.692 4.840 -999.990 -999.990 1.307 ..P WKT 2010 12 11 03 39 55 31.3200 -97.3300 251.000 457.0 127.319 4.900 -999.990 -999.990 1.273 ..P WKT 2010 12 11 03 49 55 31.3200 -97.3300 251.000 30.0 129.399 4.930 -999.990 -999.990 1.294 ..P WKT 2010 12 11 03 54 55 31.3200 -97.3300 251.000 122.0 132.715 5.760 -999.990 -999.990 1.327 ..P WKT 2010 12 11 03 59 55 31.3200 -97.3300 251.000 457.0 133.896 4.950 -999.990 -999.990 1.339 ..P WKT 2010 12 11 04 04 55 31.3200 -97.3300 251.000 30.0 131.612 4.570 -999.990 -999.990 1.316 ..P WKT 2010 12 11 04 09 55 31.3200 -97.3300 251.000 122.0 122.132 4.470 -999.990 -999.990 1.221 ..P WKT 2010 12 11 04 14 55 31.3200 -97.3300 251.000 457.0 129.177 4.510 -999.990 -999.990 1.292 ..P WKT 2010 12 11 04 24 55 31.3200 -97.3300 251.000 30.0 126.212 6.360 -999.990 -999.990 1.262 ..P WKT 2010 12 11 04 29 55 31.3200 -97.3300 251.000 122.0 130.723 4.930 -999.990 -999.990 1.307 ..P WKT 2010 12 11 04 34 55 31.3200 -97.3300 251.000 457.0 140.026 4.850 -999.990 -999.990 1.400 ..P WKT 2010 12 11 04 39 55 31.3200 -97.3300 251.000 30.0 130.953 4.950 -999.990 -999.990 1.310 ..P WKT 2010 12 11 04 44 55 31.3200 -97.3300 251.000 122.0 133.465 5.160 -999.990 -999.990 1.335 ..P WKT 2010 12 11 04 49 55 31.3200 -97.3300 251.000 457.0 136.374 4.670 -999.990 -999.990 1.364 ..P WKT 2010 12 11 05 04 55 31.3200 -97.3300 251.000 30.0 129.866 6.050 -999.990 -999.990 1.299 ..P WKT 2010 12 11 05 09 55 31.3200 -97.3300 251.000 122.0 129.749 5.160 -999.990 -999.990 1.297 ..P WKT 2010 12 11 05 14 55 31.3200 -97.3300 251.000 457.0 144.524 5.880 -999.990 -999.990 1.445 ..P WKT 2010 12 11 05 19 55 31.3200 -97.3300 251.000 30.0 124.328 5.590 -999.990 -999.990 1.243 ..P WKT 2010 12 11 05 24 55 31.3200 -97.3300 251.000 122.0 128.332 4.820 -999.990 -999.990 1.283 ..P WKT 2010 12 11 05 29 55 31.3200 -97.3300 251.000 457.0 137.784 4.300 -999.990 -999.990 1.378 ..P WKT 2010 12 11 05 39 55 31.3200 -97.3300 251.000 30.0 130.093 4.750 -999.990 -999.990 1.301 ..P WKT 2010 12 11 05 44 55 31.3200 -97.3300 251.000 122.0 133.548 6.260 -999.990 -999.990 1.335 ..P WKT 2010 12 11 05 49 55 31.3200 -97.3300 251.000 457.0 143.908 5.500 -999.990 -999.990 1.439 ..P WKT 2010 12 11 05 54 55 31.3200 -97.3300 251.000 30.0 134.478 4.910 -999.990 -999.990 1.345 ..P WKT 2010 12 11 05 59 55 31.3200 -97.3300 251.000 122.0 126.645 4.380 -999.990 -999.990 1.266 ..P WKT 2010 12 11 06 04 55 31.3200 -97.3300 251.000 457.0 145.099 4.430 -999.990 -999.990 1.451 ..P WKT 2010 12 11 06 14 55 31.3200 -97.3300 251.000 30.0 129.968 4.570 -999.990 -999.990 1.300 ..P WKT 2010 12 11 06 19 55 31.3200 -97.3300 251.000 122.0 133.021 4.990 -999.990 -999.990 1.330 ..P WKT 2010 12 11 06 24 55 31.3200 -97.3300 251.000 457.0 165.257 5.150 -999.990 -999.990 1.653 ..P WKT 2010 12 11 06 29 55 31.3200 -97.3300 251.000 30.0 125.595 4.790 -999.990 -999.990 1.256 ..P WKT 2010 12 11 06 34 55 31.3200 -97.3300 251.000 122.0 126.260 4.990 -999.990 -999.990 1.263 ..P WKT 2010 12 11 06 39 55 31.3200 -97.3300 251.000 457.0 166.435 4.940 -999.990 -999.990 1.664 ..P WKT 2010 12 11 06 49 55 31.3200 -97.3300 251.000 30.0 130.412 5.530 -999.990 -999.990 1.304 ..P WKT 2010 12 11 06 54 55 31.3200 -97.3300 251.000 122.0 134.029 4.570 -999.990 -999.990 1.340 ..P WKT 2010 12 11 06 59 55 31.3200 -97.3300 251.000 457.0 149.834 4.460 -999.990 -999.990 1.498 ..P WKT 2010 12 11 07 04 55 31.3200 -97.3300 251.000 30.0 126.423 4.590 -999.990 -999.990 1.264 ..P WKT 2010 12 11 07 09 55 31.3200 -97.3300 251.000 122.0 130.833 5.020 -999.990 -999.990 1.308 ..P WKT 2010 12 11 07 14 55 31.3200 -97.3300 251.000 457.0 150.603 4.100 -999.990 -999.990 1.506 ..P WKT 2010 12 11 07 24 55 31.3200 -97.3300 251.000 30.0 136.831 4.300 -999.990 -999.990 1.368 ..P WKT 2010 12 11 07 29 55 31.3200 -97.3300 251.000 122.0 128.455 4.990 -999.990 -999.990 1.285 ..P WKT 2010 12 11 07 34 55 31.3200 -97.3300 251.000 457.0 152.635 5.070 -999.990 -999.990 1.526 ..P WKT 2010 12 11 07 39 55 31.3200 -97.3300 251.000 30.0 129.705 5.590 -999.990 -999.990 1.297 ..P WKT 2010 12 11 07 44 55 31.3200 -97.3300 251.000 122.0 128.743 5.050 -999.990 -999.990 1.287 ..P WKT 2010 12 11 07 49 55 31.3200 -97.3300 251.000 457.0 153.440 4.310 -999.990 -999.990 1.534 ..P WKT 2010 12 11 07 59 55 31.3200 -97.3300 251.000 30.0 121.815 5.020 -999.990 -999.990 1.218 ..P WKT 2010 12 11 08 04 55 31.3200 -97.3300 251.000 122.0 130.562 4.810 -999.990 -999.990 1.306 ..P WKT 2010 12 11 08 09 55 31.3200 -97.3300 251.000 457.0 150.671 5.930 -999.990 -999.990 1.507 ..P WKT 2010 12 11 08 14 55 31.3200 -97.3300 251.000 30.0 129.280 4.810 -999.990 -999.990 1.293 ..P WKT 2010 12 11 08 19 55 31.3200 -97.3300 251.000 122.0 136.831 5.820 -999.990 -999.990 1.368 ..P WKT 2010 12 11 08 24 55 31.3200 -97.3300 251.000 457.0 157.326 4.470 -999.990 -999.990 1.573 ..P WKT 2010 12 11 08 34 55 31.3200 -97.3300 251.000 30.0 130.700 4.040 -999.990 -999.990 1.307 ..P WKT 2010 12 11 08 39 55 31.3200 -97.3300 251.000 122.0 141.566 5.220 -999.990 -999.990 1.416 ..P WKT 2010 12 11 08 44 55 31.3200 -97.3300 251.000 457.0 160.876 5.710 -999.990 -999.990 1.609 ..P WKT 2010 12 11 08 49 55 31.3200 -97.3300 251.000 30.0 139.659 4.880 -999.990 -999.990 1.397 ..P WKT 2010 12 11 08 54 55 31.3200 -97.3300 251.000 122.0 141.148 4.580 -999.990 -999.990 1.411 ..P WKT 2010 12 11 08 59 55 31.3200 -97.3300 251.000 457.0 153.851 4.450 -999.990 -999.990 1.539 ..P WKT 2010 12 11 09 09 55 31.3200 -97.3300 251.000 30.0 136.567 4.320 -999.990 -999.990 1.366 ..P WKT 2010 12 11 09 14 55 31.3200 -97.3300 251.000 122.0 135.079 4.450 -999.990 -999.990 1.351 ..P WKT 2010 12 11 09 19 55 31.3200 -97.3300 251.000 457.0 166.554 5.290 -999.990 -999.990 1.666 ..P WKT 2010 12 11 09 24 55 31.3200 -97.3300 251.000 30.0 135.400 6.080 -999.990 -999.990 1.354 ..P WKT 2010 12 11 09 29 55 31.3200 -97.3300 251.000 122.0 142.875 5.660 -999.990 -999.990 1.429 ..P WKT 2010 12 11 09 34 55 31.3200 -97.3300 251.000 457.0 166.821 4.330 -999.990 -999.990 1.668 ..P WKT 2010 12 11 09 44 55 31.3200 -97.3300 251.000 30.0 150.551 4.160 -999.990 -999.990 1.506 ..P WKT 2010 12 11 09 49 55 31.3200 -97.3300 251.000 122.0 145.261 5.950 -999.990 -999.990 1.453 ..P WKT 2010 12 11 09 54 55 31.3200 -97.3300 251.000 457.0 157.225 4.930 -999.990 -999.990 1.572 ..P WKT 2010 12 11 09 59 55 31.3200 -97.3300 251.000 30.0 144.562 4.650 -999.990 -999.990 1.446 ..P WKT 2010 12 11 10 04 55 31.3200 -97.3300 251.000 122.0 144.937 4.180 -999.990 -999.990 1.449 ..P WKT 2010 12 11 10 09 55 31.3200 -97.3300 251.000 457.0 155.711 4.180 -999.990 -999.990 1.557 ..P WKT 2010 12 11 10 19 55 31.3200 -97.3300 251.000 30.0 145.159 4.190 -999.990 -999.990 1.452 ..P WKT 2010 12 11 10 24 55 31.3200 -97.3300 251.000 122.0 137.922 4.250 -999.990 -999.990 1.379 ..P WKT 2010 12 11 10 29 55 31.3200 -97.3300 251.000 457.0 155.679 4.530 -999.990 -999.990 1.557 ..P WKT 2010 12 11 10 34 55 31.3200 -97.3300 251.000 30.0 137.396 6.190 -999.990 -999.990 1.374 ..P WKT 2010 12 11 10 39 55 31.3200 -97.3300 251.000 122.0 142.786 4.670 -999.990 -999.990 1.428 ..P WKT 2010 12 11 10 44 55 31.3200 -97.3300 251.000 457.0 149.227 4.010 -999.990 -999.990 1.492 ..P WKT 2010 12 11 10 54 55 31.3200 -97.3300 251.000 30.0 140.925 4.080 -999.990 -999.990 1.409 ..P WKT 2010 12 11 10 59 55 31.3200 -97.3300 251.000 122.0 147.475 4.890 -999.990 -999.990 1.475 ..P WKT 2010 12 11 11 04 55 31.3200 -97.3300 251.000 457.0 141.937 5.030 -999.990 -999.990 1.419 ..P WKT 2010 12 11 11 09 55 31.3200 -97.3300 251.000 30.0 138.240 5.010 -999.990 -999.990 1.382 ..P WKT 2010 12 11 11 14 55 31.3200 -97.3300 251.000 122.0 143.211 4.980 -999.990 -999.990 1.432 ..P WKT 2010 12 11 11 19 55 31.3200 -97.3300 251.000 457.0 138.990 5.260 -999.990 -999.990 1.390 ..P WKT 2010 12 11 11 29 55 31.3200 -97.3300 251.000 30.0 139.805 5.510 -999.990 -999.990 1.398 ..P WKT 2010 12 11 11 34 55 31.3200 -97.3300 251.000 122.0 147.200 5.740 -999.990 -999.990 1.472 ..P WKT 2010 12 11 11 39 55 31.3200 -97.3300 251.000 457.0 146.983 5.440 -999.990 -999.990 1.470 ..P WKT 2010 12 11 11 44 55 31.3200 -97.3300 251.000 30.0 151.226 5.530 -999.990 -999.990 1.512 ..P WKT 2010 12 11 11 49 55 31.3200 -97.3300 251.000 122.0 144.974 5.900 -999.990 -999.990 1.450 ..P WKT 2010 12 11 12 09 55 31.3200 -97.3300 251.000 457.0 148.681 4.480 -999.990 -999.990 1.487 ..P WKT 2010 12 11 12 10 25 31.3200 -97.3300 251.000 457.0 151.747 4.930 -999.990 -999.990 1.517 ..P WKT 2010 12 11 12 10 55 31.3200 -97.3300 251.000 457.0 151.534 4.890 -999.990 -999.990 1.515 ..P WKT 2010 12 11 12 11 25 31.3200 -97.3300 251.000 457.0 148.042 4.550 -999.990 -999.990 1.480 ..P WKT 2010 12 11 12 11 55 31.3200 -97.3300 251.000 457.0 144.944 4.650 -999.990 -999.990 1.449 ..P WKT 2010 12 11 12 12 25 31.3200 -97.3300 251.000 457.0 147.879 5.060 -999.990 -999.990 1.479 ..P WKT 2010 12 11 12 12 55 31.3200 -97.3300 251.000 457.0 148.322 4.550 -999.990 -999.990 1.483 ..P WKT 2010 12 11 12 13 25 31.3200 -97.3300 251.000 457.0 149.551 4.710 -999.990 -999.990 1.496 ..P WKT 2010 12 11 12 13 55 31.3200 -97.3300 251.000 457.0 149.994 4.480 -999.990 -999.990 1.500 ..P WKT 2010 12 11 12 14 25 31.3200 -97.3300 251.000 457.0 152.535 4.840 -999.990 -999.990 1.525 ..P WKT 2010 12 11 12 14 55 31.3200 -97.3300 251.000 457.0 147.207 4.750 -999.990 -999.990 1.472 ..P WKT 2010 12 11 12 19 55 31.3200 -97.3300 251.000 30.0 150.324 5.650 -999.990 -999.990 1.503 ..P WKT 2010 12 11 12 24 55 31.3200 -97.3300 251.000 122.0 151.867 5.420 -999.990 -999.990 1.519 ..P WKT 2010 12 11 12 29 55 31.3200 -97.3300 251.000 457.0 146.063 4.730 -999.990 -999.990 1.461 ..P WKT 2010 12 11 12 34 55 31.3200 -97.3300 251.000 30.0 146.294 5.310 -999.990 -999.990 1.463 ..P WKT 2010 12 11 12 39 55 31.3200 -97.3300 251.000 122.0 145.344 5.480 -999.990 -999.990 1.453 ..P WKT 2010 12 11 12 44 55 31.3200 -97.3300 251.000 457.0 141.768 6.130 -999.990 -999.990 1.418 ..P WKT 2010 12 11 12 54 55 31.3200 -97.3300 251.000 30.0 147.314 4.620 -999.990 -999.990 1.473 ..P WKT 2010 12 11 12 59 55 31.3200 -97.3300 251.000 122.0 144.621 4.500 -999.990 -999.990 1.446 ..P WKT 2010 12 11 13 04 55 31.3200 -97.3300 251.000 457.0 137.069 3.960 -999.990 -999.990 1.371 ..P WKT 2010 12 11 13 09 55 31.3200 -97.3300 251.000 30.0 146.456 3.880 -999.990 -999.990 1.465 ..P WKT 2010 12 11 13 14 55 31.3200 -97.3300 251.000 122.0 146.783 4.080 -999.990 -999.990 1.468 ..P WKT 2010 12 11 13 19 55 31.3200 -97.3300 251.000 457.0 143.957 3.710 -999.990 -999.990 1.440 ..P WKT 2010 12 11 13 29 55 31.3200 -97.3300 251.000 30.0 145.849 3.740 -999.990 -999.990 1.458 ..P WKT 2010 12 11 13 34 55 31.3200 -97.3300 251.000 122.0 145.839 4.010 -999.990 -999.990 1.458 ..P WKT 2010 12 11 13 39 55 31.3200 -97.3300 251.000 457.0 150.821 5.150 -999.990 -999.990 1.508 ..P WKT 2010 12 11 13 44 55 31.3200 -97.3300 251.000 30.0 150.548 4.160 -999.990 -999.990 1.505 ..P WKT 2010 12 11 13 49 55 31.3200 -97.3300 251.000 122.0 149.617 4.150 -999.990 -999.990 1.496 ..P WKT 2010 12 11 13 54 55 31.3200 -97.3300 251.000 457.0 156.837 4.060 -999.990 -999.990 1.568 ..P WKT 2010 12 11 14 04 55 31.3200 -97.3300 251.000 30.0 153.361 4.060 -999.990 -999.990 1.534 ..P WKT 2010 12 11 14 09 55 31.3200 -97.3300 251.000 122.0 153.576 4.210 -999.990 -999.990 1.536 ..P WKT 2010 12 11 14 14 55 31.3200 -97.3300 251.000 457.0 150.899 4.400 -999.990 -999.990 1.509 ..P WKT 2010 12 11 14 19 55 31.3200 -97.3300 251.000 30.0 152.692 4.360 -999.990 -999.990 1.527 ..P WKT 2010 12 11 14 24 55 31.3200 -97.3300 251.000 122.0 150.540 5.140 -999.990 -999.990 1.505 ..P WKT 2010 12 11 14 29 55 31.3200 -97.3300 251.000 457.0 157.858 4.540 -999.990 -999.990 1.579 ..P WKT 2010 12 11 14 39 55 31.3200 -97.3300 251.000 30.0 154.080 5.260 -999.990 -999.990 1.541 ..P WKT 2010 12 11 14 44 55 31.3200 -97.3300 251.000 122.0 162.980 3.870 -999.990 -999.990 1.630 ..P WKT 2010 12 11 14 49 55 31.3200 -97.3300 251.000 457.0 157.670 4.330 -999.990 -999.990 1.577 ..P WKT 2010 12 11 14 54 55 31.3200 -97.3300 251.000 30.0 162.097 4.200 -999.990 -999.990 1.621 ..P WKT 2010 12 11 14 59 55 31.3200 -97.3300 251.000 122.0 166.525 4.380 -999.990 -999.990 1.665 ..P WKT 2010 12 11 15 04 55 31.3200 -97.3300 251.000 457.0 135.150 3.800 -999.990 -999.990 1.352 ..P WKT 2010 12 11 15 14 55 31.3200 -97.3300 251.000 30.0 159.540 6.450 -999.990 -999.990 1.595 ..P WKT 2010 12 11 15 19 55 31.3200 -97.3300 251.000 122.0 160.283 4.340 -999.990 -999.990 1.603 ..P WKT 2010 12 11 15 24 55 31.3200 -97.3300 251.000 457.0 151.545 4.630 -999.990 -999.990 1.515 ..P WKT 2010 12 11 15 29 55 31.3200 -97.3300 251.000 30.0 155.184 4.360 -999.990 -999.990 1.552 ..P WKT 2010 12 11 15 34 55 31.3200 -97.3300 251.000 122.0 156.190 4.490 -999.990 -999.990 1.562 ..P WKT 2010 12 11 15 39 55 31.3200 -97.3300 251.000 457.0 146.658 3.850 -999.990 -999.990 1.467 ..P WKT 2010 12 11 15 49 55 31.3200 -97.3300 251.000 30.0 143.342 4.590 -999.990 -999.990 1.433 ..P WKT 2010 12 11 15 54 55 31.3200 -97.3300 251.000 122.0 142.710 4.410 -999.990 -999.990 1.427 ..P WKT 2010 12 11 15 59 55 31.3200 -97.3300 251.000 457.0 139.047 5.500 -999.990 -999.990 1.390 ..P WKT 2010 12 11 16 04 55 31.3200 -97.3300 251.000 30.0 145.136 5.390 -999.990 -999.990 1.451 ..P WKT 2010 12 11 16 09 55 31.3200 -97.3300 251.000 122.0 148.721 4.430 -999.990 -999.990 1.487 ..P WKT 2010 12 11 16 14 55 31.3200 -97.3300 251.000 457.0 154.945 5.880 -999.990 -999.990 1.549 ..P WKT 2010 12 11 16 24 55 31.3200 -97.3300 251.000 30.0 154.454 3.660 -999.990 -999.990 1.545 ..P WKT 2010 12 11 16 29 55 31.3200 -97.3300 251.000 122.0 159.606 3.820 -999.990 -999.990 1.596 ..P WKT 2010 12 11 16 34 55 31.3200 -97.3300 251.000 457.0 160.406 4.630 -999.990 -999.990 1.604 ..P WKT 2010 12 11 16 39 55 31.3200 -97.3300 251.000 30.0 164.901 3.680 -999.990 -999.990 1.649 ..P WKT 2010 12 11 16 44 55 31.3200 -97.3300 251.000 122.0 174.804 5.770 -999.990 -999.990 1.748 ..P WKT 2010 12 11 16 49 55 31.3200 -97.3300 251.000 457.0 173.100 3.650 -999.990 -999.990 1.731 ..P WKT 2010 12 11 17 04 55 31.3200 -97.3300 251.000 30.0 176.635 3.640 -999.990 -999.990 1.766 ..P WKT 2010 12 11 17 09 55 31.3200 -97.3300 251.000 122.0 181.169 4.070 -999.990 -999.990 1.812 ..P WKT 2010 12 11 17 14 55 31.3200 -97.3300 251.000 457.0 178.444 3.810 -999.990 -999.990 1.784 ..P WKT 2010 12 11 17 19 55 31.3200 -97.3300 251.000 30.0 182.979 5.750 -999.990 -999.990 1.830 ..P WKT 2010 12 11 17 24 55 31.3200 -97.3300 251.000 122.0 190.816 4.150 -999.990 -999.990 1.908 ..P WKT 2010 12 11 17 29 55 31.3200 -97.3300 251.000 457.0 183.206 3.550 -999.990 -999.990 1.832 ..P WKT 2010 12 11 17 39 55 31.3200 -97.3300 251.000 30.0 182.453 4.180 -999.990 -999.990 1.825 ..P WKT 2010 12 11 17 44 55 31.3200 -97.3300 251.000 122.0 183.503 4.540 -999.990 -999.990 1.835 ..P WKT 2010 12 11 17 49 55 31.3200 -97.3300 251.000 457.0 170.418 3.700 -999.990 -999.990 1.704 ..P WKT 2010 12 11 17 54 55 31.3200 -97.3300 251.000 30.0 181.375 4.220 -999.990 -999.990 1.814 ..P WKT 2010 12 11 17 59 55 31.3200 -97.3300 251.000 122.0 175.951 4.240 -999.990 -999.990 1.760 ..P WKT 2010 12 11 18 04 55 31.3200 -97.3300 251.000 457.0 175.546 4.970 -999.990 -999.990 1.755 ..P WKT 2010 12 11 18 14 55 31.3200 -97.3300 251.000 30.0 178.646 5.480 -999.990 -999.990 1.786 ..P WKT 2010 12 11 18 19 55 31.3200 -97.3300 251.000 122.0 176.600 4.640 -999.990 -999.990 1.766 ..P WKT 2010 12 11 18 24 55 31.3200 -97.3300 251.000 457.0 175.610 5.360 -999.990 -999.990 1.756 ..P WKT 2010 12 11 18 29 55 31.3200 -97.3300 251.000 30.0 168.802 4.510 -999.990 -999.990 1.688 ..P WKT 2010 12 11 18 34 55 31.3200 -97.3300 251.000 122.0 174.423 5.010 -999.990 -999.990 1.744 ..P WKT 2010 12 11 18 39 55 31.3200 -97.3300 251.000 457.0 171.581 4.490 -999.990 -999.990 1.716 ..P WKT 2010 12 11 18 49 55 31.3200 -97.3300 251.000 30.0 172.548 4.330 -999.990 -999.990 1.725 ..P WKT 2010 12 11 18 54 55 31.3200 -97.3300 251.000 122.0 175.299 5.250 -999.990 -999.990 1.753 ..P WKT 2010 12 11 18 59 55 31.3200 -97.3300 251.000 457.0 173.023 4.780 -999.990 -999.990 1.730 ..P WKT 2010 12 11 19 04 55 31.3200 -97.3300 251.000 30.0 182.654 4.040 -999.990 -999.990 1.827 ..P WKT 2010 12 11 19 09 55 31.3200 -97.3300 251.000 122.0 169.793 4.120 -999.990 -999.990 1.698 ..P WKT 2010 12 11 19 14 55 31.3200 -97.3300 251.000 457.0 168.575 3.390 -999.990 -999.990 1.686 ..P WKT 2010 12 11 19 24 55 31.3200 -97.3300 251.000 30.0 164.342 4.520 -999.990 -999.990 1.643 ..P WKT 2010 12 11 19 29 55 31.3200 -97.3300 251.000 122.0 166.885 4.840 -999.990 -999.990 1.669 ..P WKT 2010 12 11 19 34 55 31.3200 -97.3300 251.000 457.0 164.135 5.490 -999.990 -999.990 1.641 ..P WKT 2010 12 11 19 39 55 31.3200 -97.3300 251.000 30.0 162.707 4.480 -999.990 -999.990 1.627 ..P WKT 2010 12 11 19 44 55 31.3200 -97.3300 251.000 122.0 157.836 4.160 -999.990 -999.990 1.578 ..P WKT 2010 12 11 19 49 55 31.3200 -97.3300 251.000 457.0 155.745 3.470 -999.990 -999.990 1.557 ..P WKT 2010 12 11 19 59 55 31.3200 -97.3300 251.000 30.0 145.469 3.620 -999.990 -999.990 1.455 ..P WKT 2010 12 11 20 04 55 31.3200 -97.3300 251.000 122.0 141.654 4.900 -999.990 -999.990 1.417 ..P WKT 2010 12 11 20 09 55 31.3200 -97.3300 251.000 457.0 148.173 4.480 -999.990 -999.990 1.482 ..P WKT 2010 12 11 20 14 55 31.3200 -97.3300 251.000 30.0 147.537 4.050 -999.990 -999.990 1.475 ..P WKT 2010 12 11 20 19 55 31.3200 -97.3300 251.000 122.0 143.590 4.080 -999.990 -999.990 1.436 ..P WKT 2010 12 11 20 24 55 31.3200 -97.3300 251.000 457.0 143.616 3.490 -999.990 -999.990 1.436 ..P WKT 2010 12 11 20 34 55 31.3200 -97.3300 251.000 30.0 141.681 4.000 -999.990 -999.990 1.417 ..P WKT 2010 12 11 20 39 55 31.3200 -97.3300 251.000 122.0 138.791 4.290 -999.990 -999.990 1.388 ..P WKT 2010 12 11 20 44 55 31.3200 -97.3300 251.000 457.0 136.829 4.830 -999.990 -999.990 1.368 ..P WKT 2010 12 11 20 49 55 31.3200 -97.3300 251.000 30.0 137.120 4.800 -999.990 -999.990 1.371 ..P WKT 2010 12 11 20 54 55 31.3200 -97.3300 251.000 122.0 141.787 4.290 -999.990 -999.990 1.418 ..P WKT 2010 12 11 20 59 55 31.3200 -97.3300 251.000 457.0 139.692 4.520 -999.990 -999.990 1.397 ..P WKT 2010 12 11 21 09 55 31.3200 -97.3300 251.000 30.0 132.164 4.150 -999.990 -999.990 1.322 ..P WKT 2010 12 11 21 14 55 31.3200 -97.3300 251.000 122.0 134.691 3.950 -999.990 -999.990 1.347 ..P WKT 2010 12 11 21 19 55 31.3200 -97.3300 251.000 457.0 131.779 3.450 -999.990 -999.990 1.318 ..P WKT 2010 12 11 21 24 55 31.3200 -97.3300 251.000 30.0 134.572 3.580 -999.990 -999.990 1.346 ..P WKT 2010 12 11 21 29 55 31.3200 -97.3300 251.000 122.0 140.684 2.980 -999.990 -999.990 1.407 ..P WKT 2010 12 11 21 34 55 31.3200 -97.3300 251.000 457.0 133.789 3.080 -999.990 -999.990 1.338 ..P WKT 2010 12 11 21 44 55 31.3200 -97.3300 251.000 30.0 134.220 2.960 -999.990 -999.990 1.342 ..P WKT 2010 12 11 21 49 55 31.3200 -97.3300 251.000 122.0 134.644 3.080 -999.990 -999.990 1.346 ..P WKT 2010 12 11 21 54 55 31.3200 -97.3300 251.000 457.0 130.288 3.270 -999.990 -999.990 1.303 ..P WKT 2010 12 11 21 59 55 31.3200 -97.3300 251.000 30.0 130.844 4.910 -999.990 -999.990 1.308 ..P WKT 2010 12 11 22 04 55 31.3200 -97.3300 251.000 122.0 127.151 4.180 -999.990 -999.990 1.272 ..P WKT 2010 12 11 22 09 55 31.3200 -97.3300 251.000 457.0 135.145 4.390 -999.990 -999.990 1.351 ..P WKT 2010 12 11 22 19 55 31.3200 -97.3300 251.000 30.0 130.301 4.860 -999.990 -999.990 1.303 ..P WKT 2010 12 11 22 24 55 31.3200 -97.3300 251.000 122.0 127.289 4.360 -999.990 -999.990 1.273 ..P WKT 2010 12 11 22 29 55 31.3200 -97.3300 251.000 457.0 134.110 3.930 -999.990 -999.990 1.341 ..P WKT 2010 12 11 22 34 55 31.3200 -97.3300 251.000 30.0 122.062 4.950 -999.990 -999.990 1.221 ..P WKT 2010 12 11 22 39 55 31.3200 -97.3300 251.000 122.0 126.225 3.560 -999.990 -999.990 1.262 ..P WKT 2010 12 11 22 44 55 31.3200 -97.3300 251.000 457.0 125.339 3.450 -999.990 -999.990 1.253 ..P WKT 2010 12 11 22 54 55 31.3200 -97.3300 251.000 30.0 131.770 3.240 -999.990 -999.990 1.318 ..P WKT 2010 12 11 22 59 55 31.3200 -97.3300 251.000 122.0 125.793 2.910 -999.990 -999.990 1.258 ..P WKT 2010 12 11 23 04 55 31.3200 -97.3300 251.000 457.0 125.134 5.440 -999.990 -999.990 1.251 ..P WKT 2010 12 11 23 09 55 31.3200 -97.3300 251.000 30.0 123.145 3.320 -999.990 -999.990 1.231 ..P WKT 2010 12 11 23 14 55 31.3200 -97.3300 251.000 122.0 126.210 2.860 -999.990 -999.990 1.262 ..P WKT 2010 12 11 23 19 55 31.3200 -97.3300 251.000 457.0 126.615 2.710 -999.990 -999.990 1.266 ..P WKT 2010 12 11 23 29 55 31.3200 -97.3300 251.000 30.0 128.210 2.870 -999.990 -999.990 1.282 ..P WKT 2010 12 11 23 34 55 31.3200 -97.3300 251.000 122.0 125.940 3.480 -999.990 -999.990 1.259 ..P WKT 2010 12 11 23 39 55 31.3200 -97.3300 251.000 457.0 130.057 3.720 -999.990 -999.990 1.301 ..P WKT 2010 12 11 23 44 55 31.3200 -97.3300 251.000 30.0 132.045 4.660 -999.990 -999.990 1.320 ..P WKT 2010 12 11 23 49 55 31.3200 -97.3300 251.000 122.0 129.908 4.190 -999.990 -999.990 1.299 ..P WKT 2010 12 12 00 09 55 31.3200 -97.3300 251.000 457.0 125.168 3.460 -999.990 -999.990 1.252 ..P WKT 2010 12 12 00 10 25 31.3200 -97.3300 251.000 457.0 130.680 3.100 -999.990 -999.990 1.307 ..P WKT 2010 12 12 00 10 55 31.3200 -97.3300 251.000 457.0 129.801 3.350 -999.990 -999.990 1.298 ..P WKT 2010 12 12 00 11 25 31.3200 -97.3300 251.000 457.0 129.854 3.030 -999.990 -999.990 1.299 ..P WKT 2010 12 12 00 11 55 31.3200 -97.3300 251.000 457.0 129.508 2.920 -999.990 -999.990 1.295 ..P WKT 2010 12 12 00 12 25 31.3200 -97.3300 251.000 457.0 126.364 3.840 -999.990 -999.990 1.264 ..P WKT 2010 12 12 00 12 55 31.3200 -97.3300 251.000 457.0 130.146 4.460 -999.990 -999.990 1.301 ..P WKT 2010 12 12 00 13 25 31.3200 -97.3300 251.000 457.0 124.340 3.340 -999.990 -999.990 1.243 ..P WKT 2010 12 12 00 13 55 31.3200 -97.3300 251.000 457.0 128.254 3.260 -999.990 -999.990 1.283 ..P WKT 2010 12 12 00 14 25 31.3200 -97.3300 251.000 457.0 123.913 3.600 -999.990 -999.990 1.239 ..P WKT 2010 12 12 00 14 55 31.3200 -97.3300 251.000 457.0 124.365 3.690 -999.990 -999.990 1.244 ..P WKT 2010 12 12 00 19 55 31.3200 -97.3300 251.000 30.0 127.025 3.960 -999.990 -999.990 1.270 ..P WKT 2010 12 12 00 24 55 31.3200 -97.3300 251.000 122.0 126.088 4.870 -999.990 -999.990 1.261 ..P WKT 2010 12 12 00 29 55 31.3200 -97.3300 251.000 457.0 118.360 3.950 -999.990 -999.990 1.184 ..P WKT 2010 12 12 00 34 55 31.3200 -97.3300 251.000 30.0 126.746 3.620 -999.990 -999.990 1.267 ..P WKT 2010 12 12 00 39 55 31.3200 -97.3300 251.000 122.0 121.547 3.680 -999.990 -999.990 1.215 ..P WKT 2010 12 12 00 44 55 31.3200 -97.3300 251.000 457.0 121.276 2.740 -999.990 -999.990 1.213 ..P WKT 2010 12 12 00 54 55 31.3200 -97.3300 251.000 30.0 129.033 3.500 -999.990 -999.990 1.290 ..P WKT 2010 12 12 00 59 55 31.3200 -97.3300 251.000 122.0 123.338 4.140 -999.990 -999.990 1.233 ..P WKT 2010 12 12 01 04 55 31.3200 -97.3300 251.000 457.0 125.770 3.770 -999.990 -999.990 1.258 ..P WKT 2010 12 12 01 09 55 31.3200 -97.3300 251.000 30.0 125.271 3.300 -999.990 -999.990 1.253 ..P WKT 2010 12 12 01 14 55 31.3200 -97.3300 251.000 122.0 117.842 3.710 -999.990 -999.990 1.178 ..P WKT 2010 12 12 01 19 55 31.3200 -97.3300 251.000 457.0 126.405 3.970 -999.990 -999.990 1.264 ..P WKT 2010 12 12 01 29 55 31.3200 -97.3300 251.000 30.0 126.492 3.620 -999.990 -999.990 1.265 ..P WKT 2010 12 12 01 34 55 31.3200 -97.3300 251.000 122.0 124.813 3.770 -999.990 -999.990 1.248 ..P WKT 2010 12 12 01 39 55 31.3200 -97.3300 251.000 457.0 124.332 2.990 -999.990 -999.990 1.243 ..P WKT 2010 12 12 01 44 55 31.3200 -97.3300 251.000 30.0 123.318 3.350 -999.990 -999.990 1.233 ..P WKT 2010 12 12 01 49 55 31.3200 -97.3300 251.000 122.0 129.638 2.750 -999.990 -999.990 1.296 ..P WKT 2010 12 12 01 54 55 31.3200 -97.3300 251.000 457.0 128.091 3.160 -999.990 -999.990 1.281 ..P WKT 2010 12 12 02 04 55 31.3200 -97.3300 251.000 30.0 124.254 2.570 -999.990 -999.990 1.243 ..P WKT 2010 12 12 02 09 55 31.3200 -97.3300 251.000 122.0 124.364 4.850 -999.990 -999.990 1.244 ..P WKT 2010 12 12 02 14 55 31.3200 -97.3300 251.000 457.0 126.075 4.700 -999.990 -999.990 1.261 ..P WKT 2010 12 12 02 19 55 31.3200 -97.3300 251.000 30.0 124.584 5.270 -999.990 -999.990 1.246 ..P WKT 2010 12 12 02 24 55 31.3200 -97.3300 251.000 122.0 121.493 5.710 -999.990 -999.990 1.215 ..P WKT 2010 12 12 02 29 55 31.3200 -97.3300 251.000 457.0 123.471 3.340 -999.990 -999.990 1.235 ..P WKT 2010 12 12 02 39 55 31.3200 -97.3300 251.000 30.0 122.014 3.600 -999.990 -999.990 1.220 ..P WKT 2010 12 12 02 44 55 31.3200 -97.3300 251.000 122.0 125.517 5.050 -999.990 -999.990 1.255 ..P WKT 2010 12 12 02 49 55 31.3200 -97.3300 251.000 457.0 134.358 6.280 -999.990 -999.990 1.344 ..P WKT 2010 12 12 02 54 55 31.3200 -97.3300 251.000 30.0 125.852 4.210 -999.990 -999.990 1.259 ..P WKT 2010 12 12 02 59 55 31.3200 -97.3300 251.000 122.0 134.160 4.020 -999.990 -999.990 1.342 ..P WKT 2010 12 12 03 04 55 31.3200 -97.3300 251.000 457.0 124.051 3.000 -999.990 -999.990 1.241 ..P WKT 2010 12 12 03 14 55 31.3200 -97.3300 251.000 30.0 127.228 3.080 -999.990 -999.990 1.272 ..P WKT 2010 12 12 03 19 55 31.3200 -97.3300 251.000 122.0 130.637 4.290 -999.990 -999.990 1.306 ..P WKT 2010 12 12 03 24 55 31.3200 -97.3300 251.000 457.0 127.906 3.880 -999.990 -999.990 1.279 ..P WKT 2010 12 12 03 29 55 31.3200 -97.3300 251.000 30.0 127.311 3.600 -999.990 -999.990 1.273 ..P WKT 2010 12 12 03 34 55 31.3200 -97.3300 251.000 122.0 126.983 2.860 -999.990 -999.990 1.270 ..P WKT 2010 12 12 03 39 55 31.3200 -97.3300 251.000 457.0 129.459 3.470 -999.990 -999.990 1.295 ..P WKT 2010 12 12 03 49 55 31.3200 -97.3300 251.000 30.0 131.149 3.010 -999.990 -999.990 1.311 ..P WKT 2010 12 12 03 54 55 31.3200 -97.3300 251.000 122.0 133.702 3.120 -999.990 -999.990 1.337 ..P WKT 2010 12 12 03 59 55 31.3200 -97.3300 251.000 457.0 134.118 2.780 -999.990 -999.990 1.341 ..P WKT 2010 12 12 04 04 55 31.3200 -97.3300 251.000 30.0 132.130 3.150 -999.990 -999.990 1.321 ..P WKT 2010 12 12 04 09 55 31.3200 -97.3300 251.000 122.0 131.878 2.880 -999.990 -999.990 1.319 ..P WKT 2010 12 12 04 14 55 31.3200 -97.3300 251.000 457.0 134.298 2.860 -999.990 -999.990 1.343 ..P WKT 2010 12 12 04 24 55 31.3200 -97.3300 251.000 30.0 132.917 3.380 -999.990 -999.990 1.329 ..P WKT 2010 12 12 04 29 55 31.3200 -97.3300 251.000 122.0 133.257 2.890 -999.990 -999.990 1.333 ..P WKT 2010 12 12 04 34 55 31.3200 -97.3300 251.000 457.0 131.058 3.460 -999.990 -999.990 1.311 ..P WKT 2010 12 12 04 39 55 31.3200 -97.3300 251.000 30.0 133.002 4.660 -999.990 -999.990 1.330 ..P WKT 2010 12 12 04 44 55 31.3200 -97.3300 251.000 122.0 138.153 5.710 -999.990 -999.990 1.382 ..P WKT 2010 12 12 04 49 55 31.3200 -97.3300 251.000 457.0 135.419 4.090 -999.990 -999.990 1.354 ..P WKT 2010 12 12 05 04 55 31.3200 -97.3300 251.000 30.0 129.737 4.340 -999.990 -999.990 1.297 ..P WKT 2010 12 12 05 09 55 31.3200 -97.3300 251.000 122.0 126.391 4.050 -999.990 -999.990 1.264 ..P WKT 2010 12 12 05 14 55 31.3200 -97.3300 251.000 457.0 129.596 5.530 -999.990 -999.990 1.296 ..P WKT 2010 12 12 05 19 55 31.3200 -97.3300 251.000 30.0 132.266 5.120 -999.990 -999.990 1.323 ..P WKT 2010 12 12 05 24 55 31.3200 -97.3300 251.000 122.0 132.396 4.660 -999.990 -999.990 1.324 ..P WKT 2010 12 12 05 29 55 31.3200 -97.3300 251.000 457.0 128.381 3.560 -999.990 -999.990 1.284 ..P WKT 2010 12 12 05 39 55 31.3200 -97.3300 251.000 30.0 133.246 3.710 -999.990 -999.990 1.332 ..P WKT 2010 12 12 05 44 55 31.3200 -97.3300 251.000 122.0 132.363 4.590 -999.990 -999.990 1.324 ..P WKT 2010 12 12 05 49 55 31.3200 -97.3300 251.000 457.0 130.677 5.180 -999.990 -999.990 1.307 ..P WKT 2010 12 12 05 54 55 31.3200 -97.3300 251.000 30.0 132.738 6.060 -999.990 -999.990 1.327 ..P WKT 2010 12 12 05 59 55 31.3200 -97.3300 251.000 122.0 139.347 5.250 -999.990 -999.990 1.393 ..P WKT 2010 12 12 06 04 55 31.3200 -97.3300 251.000 457.0 137.394 6.700 -999.990 -999.990 1.374 ..P WKT 2010 12 12 06 14 55 31.3200 -97.3300 251.000 30.0 136.890 4.240 -999.990 -999.990 1.369 ..P WKT 2010 12 12 06 19 55 31.3200 -97.3300 251.000 122.0 133.523 5.920 -999.990 -999.990 1.335 ..P WKT 2010 12 12 06 24 55 31.3200 -97.3300 251.000 457.0 136.310 6.720 -999.990 -999.990 1.363 ..P WKT 2010 12 12 06 29 55 31.3200 -97.3300 251.000 30.0 127.321 5.520 -999.990 -999.990 1.273 ..P WKT 2010 12 12 06 34 55 31.3200 -97.3300 251.000 122.0 131.447 5.080 -999.990 -999.990 1.314 ..P WKT 2010 12 12 06 39 55 31.3200 -97.3300 251.000 457.0 128.613 4.410 -999.990 -999.990 1.286 ..P WKT 2010 12 12 06 49 55 31.3200 -97.3300 251.000 30.0 131.512 3.880 -999.990 -999.990 1.315 ..P WKT 2010 12 12 06 54 55 31.3200 -97.3300 251.000 122.0 132.962 5.590 -999.990 -999.990 1.330 ..P WKT 2010 12 12 06 59 55 31.3200 -97.3300 251.000 457.0 136.822 5.990 -999.990 -999.990 1.368 ..P WKT 2010 12 12 07 04 55 31.3200 -97.3300 251.000 30.0 131.845 4.980 -999.990 -999.990 1.318 ..P WKT 2010 12 12 07 09 55 31.3200 -97.3300 251.000 122.0 128.475 4.390 -999.990 -999.990 1.285 ..P WKT 2010 12 12 07 14 55 31.3200 -97.3300 251.000 457.0 133.942 3.930 -999.990 -999.990 1.339 ..P WKT 2010 12 12 07 24 55 31.3200 -97.3300 251.000 30.0 139.273 4.570 -999.990 -999.990 1.393 ..P WKT 2010 12 12 07 29 55 31.3200 -97.3300 251.000 122.0 140.207 5.130 -999.990 -999.990 1.402 ..P WKT 2010 12 12 07 34 55 31.3200 -97.3300 251.000 457.0 134.578 5.170 -999.990 -999.990 1.346 ..P WKT 2010 12 12 07 39 55 31.3200 -97.3300 251.000 30.0 136.853 5.920 -999.990 -999.990 1.369 ..P WKT 2010 12 12 07 44 55 31.3200 -97.3300 251.000 122.0 132.696 4.750 -999.990 -999.990 1.327 ..P WKT 2010 12 12 07 49 55 31.3200 -97.3300 251.000 457.0 131.487 5.160 -999.990 -999.990 1.315 ..P WKT 2010 12 12 07 59 55 31.3200 -97.3300 251.000 30.0 130.005 5.150 -999.990 -999.990 1.300 ..P WKT 2010 12 12 08 04 55 31.3200 -97.3300 251.000 122.0 136.166 4.860 -999.990 -999.990 1.362 ..P WKT 2010 12 12 08 09 55 31.3200 -97.3300 251.000 457.0 140.182 5.560 -999.990 -999.990 1.402 ..P WKT 2010 12 12 08 14 55 31.3200 -97.3300 251.000 30.0 138.035 5.450 -999.990 -999.990 1.380 ..P WKT 2010 12 12 08 19 55 31.3200 -97.3300 251.000 122.0 137.094 5.430 -999.990 -999.990 1.371 ..P WKT 2010 12 12 08 24 55 31.3200 -97.3300 251.000 457.0 142.318 5.620 -999.990 -999.990 1.423 ..P WKT 2010 12 12 08 34 55 31.3200 -97.3300 251.000 30.0 139.440 6.490 -999.990 -999.990 1.394 ..P WKT 2010 12 12 08 39 55 31.3200 -97.3300 251.000 122.0 143.400 5.160 -999.990 -999.990 1.434 ..P WKT 2010 12 12 08 44 55 31.3200 -97.3300 251.000 457.0 138.380 5.330 -999.990 -999.990 1.384 ..P WKT 2010 12 12 08 49 55 31.3200 -97.3300 251.000 30.0 140.062 5.170 -999.990 -999.990 1.401 ..P WKT 2010 12 12 08 54 55 31.3200 -97.3300 251.000 122.0 144.695 4.610 -999.990 -999.990 1.447 ..P WKT 2010 12 12 08 59 55 31.3200 -97.3300 251.000 457.0 125.727 4.270 -999.990 -999.990 1.257 ..P WKT 2010 12 12 09 09 55 31.3200 -97.3300 251.000 30.0 138.363 4.560 -999.990 -999.990 1.384 ..P WKT 2010 12 12 09 14 55 31.3200 -97.3300 251.000 122.0 140.468 4.690 -999.990 -999.990 1.405 ..P WKT 2010 12 12 09 19 55 31.3200 -97.3300 251.000 457.0 138.280 5.650 -999.990 -999.990 1.383 ..P WKT 2010 12 12 09 24 55 31.3200 -97.3300 251.000 30.0 140.250 4.930 -999.990 -999.990 1.403 ..P WKT 2010 12 12 09 29 55 31.3200 -97.3300 251.000 122.0 142.758 4.510 -999.990 -999.990 1.428 ..P WKT 2010 12 12 09 34 55 31.3200 -97.3300 251.000 457.0 139.497 4.200 -999.990 -999.990 1.395 ..P WKT 2010 12 12 09 44 55 31.3200 -97.3300 251.000 30.0 137.094 4.030 -999.990 -999.990 1.371 ..P WKT 2010 12 12 09 49 55 31.3200 -97.3300 251.000 122.0 146.139 4.810 -999.990 -999.990 1.461 ..P WKT 2010 12 12 09 54 55 31.3200 -97.3300 251.000 457.0 138.545 5.300 -999.990 -999.990 1.385 ..P WKT 2010 12 12 09 59 55 31.3200 -97.3300 251.000 30.0 144.370 4.390 -999.990 -999.990 1.444 ..P WKT 2010 12 12 10 04 55 31.3200 -97.3300 251.000 122.0 138.117 4.600 -999.990 -999.990 1.381 ..P WKT 2010 12 12 10 09 55 31.3200 -97.3300 251.000 457.0 145.016 3.760 -999.990 -999.990 1.450 ..P WKT 2010 12 12 10 19 55 31.3200 -97.3300 251.000 30.0 135.921 3.630 -999.990 -999.990 1.359 ..P WKT 2010 12 12 10 24 55 31.3200 -97.3300 251.000 122.0 134.959 3.730 -999.990 -999.990 1.350 ..P WKT 2010 12 12 10 29 55 31.3200 -97.3300 251.000 457.0 132.654 3.740 -999.990 -999.990 1.327 ..P WKT 2010 12 12 10 34 55 31.3200 -97.3300 251.000 30.0 138.673 3.850 -999.990 -999.990 1.387 ..P WKT 2010 12 12 10 39 55 31.3200 -97.3300 251.000 122.0 131.266 3.570 -999.990 -999.990 1.313 ..P WKT 2010 12 12 10 44 55 31.3200 -97.3300 251.000 457.0 131.109 4.700 -999.990 -999.990 1.311 ..P WKT 2010 12 12 10 54 55 31.3200 -97.3300 251.000 30.0 137.010 3.840 -999.990 -999.990 1.370 ..P WKT 2010 12 12 10 59 55 31.3200 -97.3300 251.000 122.0 141.458 4.130 -999.990 -999.990 1.415 ..P WKT 2010 12 12 11 04 55 31.3200 -97.3300 251.000 457.0 130.326 4.380 -999.990 -999.990 1.303 ..P WKT 2010 12 12 11 09 55 31.3200 -97.3300 251.000 30.0 140.147 4.140 -999.990 -999.990 1.401 ..P WKT 2010 12 12 11 14 55 31.3200 -97.3300 251.000 122.0 132.775 3.840 -999.990 -999.990 1.328 ..P WKT 2010 12 12 11 19 55 31.3200 -97.3300 251.000 457.0 138.567 4.190 -999.990 -999.990 1.386 ..P WKT 2010 12 12 11 29 55 31.3200 -97.3300 251.000 30.0 136.414 3.990 -999.990 -999.990 1.364 ..P WKT 2010 12 12 11 34 55 31.3200 -97.3300 251.000 122.0 131.825 4.420 -999.990 -999.990 1.318 ..P WKT 2010 12 12 11 39 55 31.3200 -97.3300 251.000 457.0 130.192 5.490 -999.990 -999.990 1.302 ..P WKT 2010 12 12 11 44 55 31.3200 -97.3300 251.000 30.0 132.052 4.770 -999.990 -999.990 1.321 ..P WKT 2010 12 12 11 49 55 31.3200 -97.3300 251.000 122.0 129.210 5.070 -999.990 -999.990 1.292 ..P WKT 2010 12 12 12 09 55 31.3200 -97.3300 251.000 457.0 131.587 4.360 -999.990 -999.990 1.316 ..P WKT 2010 12 12 12 10 25 31.3200 -97.3300 251.000 457.0 128.414 4.050 -999.990 -999.990 1.284 ..P WKT 2010 12 12 12 10 55 31.3200 -97.3300 251.000 457.0 129.004 4.050 -999.990 -999.990 1.290 ..P WKT 2010 12 12 12 11 25 31.3200 -97.3300 251.000 457.0 129.057 4.220 -999.990 -999.990 1.291 ..P WKT 2010 12 12 12 11 55 31.3200 -97.3300 251.000 457.0 132.606 4.250 -999.990 -999.990 1.326 ..P WKT 2010 12 12 12 12 25 31.3200 -97.3300 251.000 457.0 130.105 4.190 -999.990 -999.990 1.301 ..P WKT 2010 12 12 12 12 55 31.3200 -97.3300 251.000 457.0 128.277 4.760 -999.990 -999.990 1.283 ..P WKT 2010 12 12 12 13 25 31.3200 -97.3300 251.000 457.0 127.792 4.640 -999.990 -999.990 1.278 ..P WKT 2010 12 12 12 13 55 31.3200 -97.3300 251.000 457.0 127.576 4.350 -999.990 -999.990 1.276 ..P WKT 2010 12 12 12 14 25 31.3200 -97.3300 251.000 457.0 126.554 4.780 -999.990 -999.990 1.266 ..P WKT 2010 12 12 12 14 55 31.3200 -97.3300 251.000 457.0 124.053 5.350 -999.990 -999.990 1.241 ..P WKT 2010 12 12 12 19 55 31.3200 -97.3300 251.000 30.0 129.289 4.440 -999.990 -999.990 1.293 ..P WKT 2010 12 12 12 24 55 31.3200 -97.3300 251.000 122.0 124.981 4.780 -999.990 -999.990 1.250 ..P WKT 2010 12 12 12 29 55 31.3200 -97.3300 251.000 457.0 130.353 4.690 -999.990 -999.990 1.304 ..P WKT 2010 12 12 12 34 55 31.3200 -97.3300 251.000 30.0 129.271 4.750 -999.990 -999.990 1.293 ..P WKT 2010 12 12 12 39 55 31.3200 -97.3300 251.000 122.0 129.265 5.100 -999.990 -999.990 1.293 ..P WKT 2010 12 12 12 44 55 31.3200 -97.3300 251.000 457.0 128.318 5.050 -999.990 -999.990 1.283 ..P WKT 2010 12 12 12 54 55 31.3200 -97.3300 251.000 30.0 132.143 5.120 -999.990 -999.990 1.321 ..P WKT 2010 12 12 12 59 55 31.3200 -97.3300 251.000 122.0 129.923 4.610 -999.990 -999.990 1.299 ..P WKT 2010 12 12 13 04 55 31.3200 -97.3300 251.000 457.0 130.797 4.500 -999.990 -999.990 1.308 ..P WKT 2010 12 12 13 09 55 31.3200 -97.3300 251.000 30.0 128.442 4.290 -999.990 -999.990 1.284 ..P WKT 2010 12 12 13 14 55 31.3200 -97.3300 251.000 122.0 128.374 3.950 -999.990 -999.990 1.284 ..P WKT 2010 12 12 13 19 55 31.3200 -97.3300 251.000 457.0 126.558 4.140 -999.990 -999.990 1.266 ..P WKT 2010 12 12 13 29 55 31.3200 -97.3300 251.000 30.0 133.838 4.180 -999.990 -999.990 1.338 ..P WKT 2010 12 12 13 34 55 31.3200 -97.3300 251.000 122.0 131.772 4.350 -999.990 -999.990 1.318 ..P WKT 2010 12 12 13 39 55 31.3200 -97.3300 251.000 457.0 133.203 4.090 -999.990 -999.990 1.332 ..P WKT 2010 12 12 13 44 55 31.3200 -97.3300 251.000 30.0 133.019 4.240 -999.990 -999.990 1.330 ..P WKT 2010 12 12 13 49 55 31.3200 -97.3300 251.000 122.0 132.029 4.090 -999.990 -999.990 1.320 ..P WKT 2010 12 12 13 54 55 31.3200 -97.3300 251.000 457.0 127.271 4.420 -999.990 -999.990 1.273 ..P WKT 2010 12 12 14 04 55 31.3200 -97.3300 251.000 30.0 136.245 4.240 -999.990 -999.990 1.362 ..P WKT 2010 12 12 14 09 55 31.3200 -97.3300 251.000 122.0 130.604 3.970 -999.990 -999.990 1.306 ..P WKT 2010 12 12 14 14 55 31.3200 -97.3300 251.000 457.0 122.270 4.360 -999.990 -999.990 1.223 ..P WKT 2010 12 12 14 19 55 31.3200 -97.3300 251.000 30.0 132.774 4.010 -999.990 -999.990 1.328 ..P WKT 2010 12 12 14 24 55 31.3200 -97.3300 251.000 122.0 132.245 3.890 -999.990 -999.990 1.322 ..P WKT 2010 12 12 14 29 55 31.3200 -97.3300 251.000 457.0 117.182 5.340 -999.990 -999.990 1.172 ..P WKT 2010 12 12 14 39 55 31.3200 -97.3300 251.000 30.0 129.272 4.530 -999.990 -999.990 1.293 ..P WKT 2010 12 12 14 44 55 31.3200 -97.3300 251.000 122.0 130.588 3.640 -999.990 -999.990 1.306 ..P WKT 2010 12 12 14 49 55 31.3200 -97.3300 251.000 457.0 124.098 3.910 -999.990 -999.990 1.241 ..P WKT 2010 12 12 14 54 55 31.3200 -97.3300 251.000 30.0 127.568 3.700 -999.990 -999.990 1.276 ..P WKT 2010 12 12 14 59 55 31.3200 -97.3300 251.000 122.0 131.307 5.580 -999.990 -999.990 1.313 ..P WKT 2010 12 12 15 04 55 31.3200 -97.3300 251.000 457.0 124.547 4.020 -999.990 -999.990 1.245 ..P WKT 2010 12 12 15 14 55 31.3200 -97.3300 251.000 30.0 130.564 4.080 -999.990 -999.990 1.306 ..P WKT 2010 12 12 15 19 55 31.3200 -97.3300 251.000 122.0 132.573 4.430 -999.990 -999.990 1.326 ..P WKT 2010 12 12 15 24 55 31.3200 -97.3300 251.000 457.0 131.082 6.770 -999.990 -999.990 1.311 ..P WKT 2010 12 12 15 29 55 31.3200 -97.3300 251.000 30.0 125.552 4.960 -999.990 -999.990 1.256 ..P WKT 2010 12 12 15 34 55 31.3200 -97.3300 251.000 122.0 130.657 4.980 -999.990 -999.990 1.307 ..P WKT 2010 12 12 15 39 55 31.3200 -97.3300 251.000 457.0 131.321 4.430 -999.990 -999.990 1.313 ..P WKT 2010 12 12 15 49 55 31.3200 -97.3300 251.000 30.0 133.781 4.140 -999.990 -999.990 1.338 ..P WKT 2010 12 12 15 54 55 31.3200 -97.3300 251.000 122.0 129.519 4.590 -999.990 -999.990 1.295 ..P WKT 2010 12 12 15 59 55 31.3200 -97.3300 251.000 457.0 118.524 5.190 -999.990 -999.990 1.185 ..P WKT 2010 12 12 16 04 55 31.3200 -97.3300 251.000 30.0 125.035 4.590 -999.990 -999.990 1.250 ..P WKT 2010 12 12 16 09 55 31.3200 -97.3300 251.000 122.0 123.870 4.490 -999.990 -999.990 1.239 ..P WKT 2010 12 12 16 14 55 31.3200 -97.3300 251.000 457.0 120.819 4.470 -999.990 -999.990 1.208 ..P WKT 2010 12 12 16 24 55 31.3200 -97.3300 251.000 30.0 120.355 4.870 -999.990 -999.990 1.204 ..P WKT 2010 12 12 16 29 55 31.3200 -97.3300 251.000 122.0 117.285 4.200 -999.990 -999.990 1.173 ..P WKT 2010 12 12 16 34 55 31.3200 -97.3300 251.000 457.0 120.276 4.450 -999.990 -999.990 1.203 ..P WKT 2010 12 12 16 39 55 31.3200 -97.3300 251.000 30.0 125.961 4.040 -999.990 -999.990 1.260 ..P WKT 2010 12 12 16 44 55 31.3200 -97.3300 251.000 122.0 119.388 4.400 -999.990 -999.990 1.194 ..P WKT 2010 12 12 16 49 55 31.3200 -97.3300 251.000 457.0 122.649 4.180 -999.990 -999.990 1.226 ..P WKT 2010 12 12 17 04 55 31.3200 -97.3300 251.000 30.0 123.806 3.940 -999.990 -999.990 1.238 ..P WKT 2010 12 12 17 09 55 31.3200 -97.3300 251.000 122.0 126.324 3.620 -999.990 -999.990 1.263 ..P WKT 2010 12 12 17 14 55 31.3200 -97.3300 251.000 457.0 123.317 4.320 -999.990 -999.990 1.233 ..P WKT 2010 12 12 17 19 55 31.3200 -97.3300 251.000 30.0 124.622 3.600 -999.990 -999.990 1.246 ..P WKT 2010 12 12 17 24 55 31.3200 -97.3300 251.000 122.0 124.850 3.690 -999.990 -999.990 1.248 ..P WKT 2010 12 12 17 29 55 31.3200 -97.3300 251.000 457.0 125.347 3.540 -999.990 -999.990 1.253 ..P WKT 2010 12 12 17 39 55 31.3200 -97.3300 251.000 30.0 133.747 6.140 -999.990 -999.990 1.337 ..P WKT 2010 12 12 17 44 55 31.3200 -97.3300 251.000 122.0 127.633 3.720 -999.990 -999.990 1.276 ..P WKT 2010 12 12 17 49 55 31.3200 -97.3300 251.000 457.0 126.102 4.490 -999.990 -999.990 1.261 ..P WKT 2010 12 12 17 54 55 31.3200 -97.3300 251.000 30.0 125.918 3.950 -999.990 -999.990 1.259 ..P WKT 2010 12 12 17 59 55 31.3200 -97.3300 251.000 122.0 124.925 4.910 -999.990 -999.990 1.249 ..P WKT 2010 12 12 18 04 55 31.3200 -97.3300 251.000 457.0 132.020 6.450 -999.990 -999.990 1.320 ..P WKT 2010 12 12 18 14 55 31.3200 -97.3300 251.000 30.0 125.567 4.140 -999.990 -999.990 1.256 ..P WKT 2010 12 12 18 19 55 31.3200 -97.3300 251.000 122.0 121.455 4.400 -999.990 -999.990 1.215 ..P WKT 2010 12 12 18 24 55 31.3200 -97.3300 251.000 457.0 128.936 4.190 -999.990 -999.990 1.289 ..P WKT 2010 12 12 18 29 55 31.3200 -97.3300 251.000 30.0 124.553 4.220 -999.990 -999.990 1.246 ..P WKT 2010 12 12 18 34 55 31.3200 -97.3300 251.000 122.0 130.957 4.040 -999.990 -999.990 1.310 ..P WKT 2010 12 12 18 39 55 31.3200 -97.3300 251.000 457.0 133.045 4.090 -999.990 -999.990 1.330 ..P WKT 2010 12 12 18 49 55 31.3200 -97.3300 251.000 30.0 125.628 4.560 -999.990 -999.990 1.256 ..P WKT 2010 12 12 18 54 55 31.3200 -97.3300 251.000 122.0 124.480 4.510 -999.990 -999.990 1.245 ..P WKT 2010 12 12 18 59 55 31.3200 -97.3300 251.000 457.0 127.109 4.240 -999.990 -999.990 1.271 ..P WKT 2010 12 12 19 04 55 31.3200 -97.3300 251.000 30.0 120.837 4.430 -999.990 -999.990 1.208 ..P WKT 2010 12 12 19 09 55 31.3200 -97.3300 251.000 122.0 122.117 4.430 -999.990 -999.990 1.221 ..P WKT 2010 12 12 19 14 55 31.3200 -97.3300 251.000 457.0 119.891 4.650 -999.990 -999.990 1.199 ..P WKT 2010 12 12 19 24 55 31.3200 -97.3300 251.000 30.0 122.875 4.230 -999.990 -999.990 1.229 ..P WKT 2010 12 12 19 29 55 31.3200 -97.3300 251.000 122.0 128.221 4.590 -999.990 -999.990 1.282 ..P WKT 2010 12 12 19 34 55 31.3200 -97.3300 251.000 457.0 118.460 4.990 -999.990 -999.990 1.185 ..P WKT 2010 12 12 19 39 55 31.3200 -97.3300 251.000 30.0 123.672 3.920 -999.990 -999.990 1.237 ..P WKT 2010 12 12 19 44 55 31.3200 -97.3300 251.000 122.0 130.232 4.240 -999.990 -999.990 1.302 ..P WKT 2010 12 12 19 49 55 31.3200 -97.3300 251.000 457.0 125.461 4.000 -999.990 -999.990 1.255 ..P WKT 2010 12 12 19 59 55 31.3200 -97.3300 251.000 30.0 124.226 4.000 -999.990 -999.990 1.242 ..P WKT 2010 12 12 20 04 55 31.3200 -97.3300 251.000 122.0 123.714 3.950 -999.990 -999.990 1.237 ..P WKT 2010 12 12 20 09 55 31.3200 -97.3300 251.000 457.0 123.742 3.920 -999.990 -999.990 1.237 ..P WKT 2010 12 12 20 14 55 31.3200 -97.3300 251.000 30.0 122.826 4.430 -999.990 -999.990 1.228 ..P WKT 2010 12 12 20 19 55 31.3200 -97.3300 251.000 122.0 125.283 3.570 -999.990 -999.990 1.253 ..P WKT 2010 12 12 20 24 55 31.3200 -97.3300 251.000 457.0 125.310 3.950 -999.990 -999.990 1.253 ..P WKT 2010 12 12 20 34 55 31.3200 -97.3300 251.000 30.0 127.043 3.610 -999.990 -999.990 1.270 ..P WKT 2010 12 12 20 39 55 31.3200 -97.3300 251.000 122.0 128.749 3.610 -999.990 -999.990 1.287 ..P WKT 2010 12 12 20 44 55 31.3200 -97.3300 251.000 457.0 128.430 4.000 -999.990 -999.990 1.284 ..P WKT 2010 12 12 20 49 55 31.3200 -97.3300 251.000 30.0 130.406 3.700 -999.990 -999.990 1.304 ..P WKT 2010 12 12 20 54 55 31.3200 -97.3300 251.000 122.0 129.816 4.360 -999.990 -999.990 1.298 ..P WKT 2010 12 12 20 59 55 31.3200 -97.3300 251.000 457.0 131.657 3.960 -999.990 -999.990 1.317 ..P WKT 2010 12 12 21 09 55 31.3200 -97.3300 251.000 30.0 138.193 6.410 -999.990 -999.990 1.382 ..P WKT 2010 12 12 21 14 55 31.3200 -97.3300 251.000 122.0 132.764 4.540 -999.990 -999.990 1.328 ..P WKT 2010 12 12 21 19 55 31.3200 -97.3300 251.000 457.0 133.409 3.850 -999.990 -999.990 1.334 ..P WKT 2010 12 12 21 24 55 31.3200 -97.3300 251.000 30.0 130.544 4.500 -999.990 -999.990 1.305 ..P WKT 2010 12 12 21 29 55 31.3200 -97.3300 251.000 122.0 133.079 4.030 -999.990 -999.990 1.331 ..P WKT 2010 12 12 21 34 55 31.3200 -97.3300 251.000 457.0 130.214 4.600 -999.990 -999.990 1.302 ..P WKT 2010 12 12 21 44 55 31.3200 -97.3300 251.000 30.0 133.531 5.290 -999.990 -999.990 1.335 ..P WKT 2010 12 12 21 49 55 31.3200 -97.3300 251.000 122.0 128.100 4.100 -999.990 -999.990 1.281 ..P WKT 2010 12 12 21 54 55 31.3200 -97.3300 251.000 457.0 129.420 5.510 -999.990 -999.990 1.294 ..P WKT 2010 12 12 21 59 55 31.3200 -97.3300 251.000 30.0 135.333 4.500 -999.990 -999.990 1.353 ..P WKT 2010 12 12 22 04 55 31.3200 -97.3300 251.000 122.0 133.412 4.080 -999.990 -999.990 1.334 ..P WKT 2010 12 12 22 09 55 31.3200 -97.3300 251.000 457.0 136.354 3.660 -999.990 -999.990 1.364 ..P WKT 2010 12 12 22 19 55 31.3200 -97.3300 251.000 30.0 135.408 4.340 -999.990 -999.990 1.354 ..P WKT 2010 12 12 22 24 55 31.3200 -97.3300 251.000 122.0 133.680 4.260 -999.990 -999.990 1.337 ..P WKT 2010 12 12 22 29 55 31.3200 -97.3300 251.000 457.0 138.436 4.390 -999.990 -999.990 1.384 ..P WKT 2010 12 12 22 34 55 31.3200 -97.3300 251.000 30.0 135.357 4.640 -999.990 -999.990 1.354 ..P WKT 2010 12 12 22 39 55 31.3200 -97.3300 251.000 122.0 137.413 3.790 -999.990 -999.990 1.374 ..P WKT 2010 12 12 22 44 55 31.3200 -97.3300 251.000 457.0 133.253 4.780 -999.990 -999.990 1.333 ..P WKT 2010 12 12 22 54 55 31.3200 -97.3300 251.000 30.0 135.471 4.660 -999.990 -999.990 1.355 ..P WKT 2010 12 12 22 59 55 31.3200 -97.3300 251.000 122.0 132.933 4.820 -999.990 -999.990 1.329 ..P WKT 2010 12 12 23 04 55 31.3200 -97.3300 251.000 457.0 132.825 4.310 -999.990 -999.990 1.328 ..P WKT 2010 12 12 23 09 55 31.3200 -97.3300 251.000 30.0 133.800 4.830 -999.990 -999.990 1.338 ..P WKT 2010 12 12 23 14 55 31.3200 -97.3300 251.000 122.0 128.558 5.080 -999.990 -999.990 1.286 ..P WKT 2010 12 12 23 19 55 31.3200 -97.3300 251.000 457.0 130.072 4.600 -999.990 -999.990 1.301 ..P WKT 2010 12 12 23 29 55 31.3200 -97.3300 251.000 30.0 130.363 4.560 -999.990 -999.990 1.304 ..P WKT 2010 12 12 23 34 55 31.3200 -97.3300 251.000 122.0 128.868 4.500 -999.990 -999.990 1.289 ..P WKT 2010 12 12 23 39 55 31.3200 -97.3300 251.000 457.0 132.374 4.060 -999.990 -999.990 1.324 ..P WKT 2010 12 12 23 44 55 31.3200 -97.3300 251.000 30.0 128.717 4.410 -999.990 -999.990 1.287 ..P WKT 2010 12 12 23 49 55 31.3200 -97.3300 251.000 122.0 136.954 5.180 -999.990 -999.990 1.370 ..P WKT 2010 12 13 00 09 55 31.3200 -97.3300 251.000 457.0 130.496 4.390 -999.990 -999.990 1.305 ..P WKT 2010 12 13 00 10 25 31.3200 -97.3300 251.000 457.0 127.647 4.440 -999.990 -999.990 1.276 ..P WKT 2010 12 13 00 10 55 31.3200 -97.3300 251.000 457.0 126.826 4.210 -999.990 -999.990 1.268 ..P WKT 2010 12 13 00 11 25 31.3200 -97.3300 251.000 457.0 132.629 4.380 -999.990 -999.990 1.326 ..P WKT 2010 12 13 00 11 55 31.3200 -97.3300 251.000 457.0 135.188 4.150 -999.990 -999.990 1.352 ..P WKT 2010 12 13 00 12 25 31.3200 -97.3300 251.000 457.0 132.339 4.080 -999.990 -999.990 1.323 ..P WKT 2010 12 13 00 12 55 31.3200 -97.3300 251.000 457.0 128.543 5.010 -999.990 -999.990 1.285 ..P WKT 2010 12 13 00 13 25 31.3200 -97.3300 251.000 457.0 129.209 4.210 -999.990 -999.990 1.292 ..P WKT 2010 12 13 00 13 55 31.3200 -97.3300 251.000 457.0 131.498 4.620 -999.990 -999.990 1.315 ..P WKT 2010 12 13 00 14 25 31.3200 -97.3300 251.000 457.0 132.839 4.140 -999.990 -999.990 1.328 ..P WKT 2010 12 13 00 14 55 31.3200 -97.3300 251.000 457.0 132.694 4.310 -999.990 -999.990 1.327 ..P WKT 2010 12 13 00 19 55 31.3200 -97.3300 251.000 30.0 134.351 4.330 -999.990 -999.990 1.344 ..P WKT 2010 12 13 00 24 55 31.3200 -97.3300 251.000 122.0 130.600 4.100 -999.990 -999.990 1.306 ..P WKT 2010 12 13 00 29 55 31.3200 -97.3300 251.000 457.0 135.639 5.210 -999.990 -999.990 1.356 ..P WKT 2010 12 13 00 34 55 31.3200 -97.3300 251.000 30.0 134.592 5.410 -999.990 -999.990 1.346 ..P WKT 2010 12 13 00 39 55 31.3200 -97.3300 251.000 122.0 133.410 4.560 -999.990 -999.990 1.334 ..P WKT 2010 12 13 00 44 55 31.3200 -97.3300 251.000 457.0 131.552 4.410 -999.990 -999.990 1.316 ..P WKT 2010 12 13 00 54 55 31.3200 -97.3300 251.000 30.0 138.600 4.460 -999.990 -999.990 1.386 ..P WKT 2010 12 13 00 59 55 31.3200 -97.3300 251.000 122.0 131.819 5.390 -999.990 -999.990 1.318 ..P WKT 2010 12 13 01 04 55 31.3200 -97.3300 251.000 457.0 131.259 4.280 -999.990 -999.990 1.313 ..P WKT 2010 12 13 01 09 55 31.3200 -97.3300 251.000 30.0 132.863 4.710 -999.990 -999.990 1.329 ..P WKT 2010 12 13 01 14 55 31.3200 -97.3300 251.000 122.0 140.961 4.450 -999.990 -999.990 1.410 ..P WKT 2010 12 13 01 19 55 31.3200 -97.3300 251.000 457.0 129.985 4.750 -999.990 -999.990 1.300 ..P WKT 2010 12 13 01 29 55 31.3200 -97.3300 251.000 30.0 141.950 4.250 -999.990 -999.990 1.419 ..P WKT 2010 12 13 01 34 55 31.3200 -97.3300 251.000 122.0 137.564 4.150 -999.990 -999.990 1.376 ..P WKT 2010 12 13 01 39 55 31.3200 -97.3300 251.000 457.0 135.612 3.760 -999.990 -999.990 1.356 ..P WKT 2010 12 13 01 44 55 31.3200 -97.3300 251.000 30.0 138.803 3.580 -999.990 -999.990 1.388 ..P WKT 2010 12 13 01 49 55 31.3200 -97.3300 251.000 122.0 138.745 3.550 -999.990 -999.990 1.387 ..P WKT 2010 12 13 01 54 55 31.3200 -97.3300 251.000 457.0 133.275 3.430 -999.990 -999.990 1.333 ..P WKT 2010 12 13 02 04 55 31.3200 -97.3300 251.000 30.0 136.795 3.990 -999.990 -999.990 1.368 ..P WKT 2010 12 13 02 09 55 31.3200 -97.3300 251.000 122.0 138.208 3.610 -999.990 -999.990 1.382 ..P WKT 2010 12 13 02 14 55 31.3200 -97.3300 251.000 457.0 133.935 3.490 -999.990 -999.990 1.339 ..P WKT 2010 12 13 02 19 55 31.3200 -97.3300 251.000 30.0 131.828 4.850 -999.990 -999.990 1.318 ..P WKT 2010 12 13 02 24 55 31.3200 -97.3300 251.000 122.0 136.218 3.730 -999.990 -999.990 1.362 ..P WKT 2010 12 13 02 29 55 31.3200 -97.3300 251.000 457.0 138.713 4.070 -999.990 -999.990 1.387 ..P WKT 2010 12 13 02 39 55 31.3200 -97.3300 251.000 30.0 130.689 3.850 -999.990 -999.990 1.307 ..P WKT 2010 12 13 02 44 55 31.3200 -97.3300 251.000 122.0 139.664 4.410 -999.990 -999.990 1.397 ..P WKT 2010 12 13 02 49 55 31.3200 -97.3300 251.000 457.0 132.121 4.760 -999.990 -999.990 1.321 ..P WKT 2010 12 13 02 54 55 31.3200 -97.3300 251.000 30.0 138.660 4.290 -999.990 -999.990 1.387 ..P WKT 2010 12 13 02 59 55 31.3200 -97.3300 251.000 122.0 138.971 3.640 -999.990 -999.990 1.390 ..P WKT 2010 12 13 03 04 55 31.3200 -97.3300 251.000 457.0 134.677 3.100 -999.990 -999.990 1.347 ..P WKT 2010 12 13 03 14 55 31.3200 -97.3300 251.000 30.0 143.617 3.080 -999.990 -999.990 1.436 ..P WKT 2010 12 13 03 19 55 31.3200 -97.3300 251.000 122.0 143.308 3.930 -999.990 -999.990 1.433 ..P WKT 2010 12 13 03 24 55 31.3200 -97.3300 251.000 457.0 135.280 5.600 -999.990 -999.990 1.353 ..P WKT 2010 12 13 03 29 55 31.3200 -97.3300 251.000 30.0 139.170 3.380 -999.990 -999.990 1.392 ..P WKT 2010 12 13 03 34 55 31.3200 -97.3300 251.000 122.0 144.144 3.400 -999.990 -999.990 1.441 ..P WKT 2010 12 13 03 39 55 31.3200 -97.3300 251.000 457.0 141.668 3.300 -999.990 -999.990 1.417 ..P WKT 2010 12 13 03 49 55 31.3200 -97.3300 251.000 30.0 141.108 3.440 -999.990 -999.990 1.411 ..P WKT 2010 12 13 03 54 55 31.3200 -97.3300 251.000 122.0 139.639 3.480 -999.990 -999.990 1.396 ..P WKT 2010 12 13 03 59 55 31.3200 -97.3300 251.000 457.0 138.981 3.410 -999.990 -999.990 1.390 ..P WKT 2010 12 13 04 04 55 31.3200 -97.3300 251.000 30.0 135.072 3.650 -999.990 -999.990 1.351 ..P WKT 2010 12 13 04 09 55 31.3200 -97.3300 251.000 122.0 144.171 3.760 -999.990 -999.990 1.442 ..P WKT 2010 12 13 04 14 55 31.3200 -97.3300 251.000 457.0 134.299 3.550 -999.990 -999.990 1.343 ..P WKT 2010 12 13 04 24 55 31.3200 -97.3300 251.000 30.0 136.276 3.350 -999.990 -999.990 1.363 ..P WKT 2010 12 13 04 29 55 31.3200 -97.3300 251.000 122.0 136.063 3.570 -999.990 -999.990 1.361 ..P WKT 2010 12 13 04 34 55 31.3200 -97.3300 251.000 457.0 138.833 4.130 -999.990 -999.990 1.388 ..P WKT 2010 12 13 04 39 55 31.3200 -97.3300 251.000 30.0 139.705 4.060 -999.990 -999.990 1.397 ..P WKT 2010 12 13 04 44 55 31.3200 -97.3300 251.000 122.0 139.086 3.340 -999.990 -999.990 1.391 ..P WKT 2010 12 13 04 49 55 31.3200 -97.3300 251.000 457.0 132.504 2.820 -999.990 -999.990 1.325 ..P WKT 2010 12 13 05 04 55 31.3200 -97.3300 251.000 30.0 136.872 3.430 -999.990 -999.990 1.369 ..P WKT 2010 12 13 05 09 55 31.3200 -97.3300 251.000 122.0 133.198 3.590 -999.990 -999.990 1.332 ..P WKT 2010 12 13 05 14 55 31.3200 -97.3300 251.000 457.0 131.693 3.450 -999.990 -999.990 1.317 ..P WKT 2010 12 13 05 19 55 31.3200 -97.3300 251.000 30.0 135.611 2.900 -999.990 -999.990 1.356 ..P WKT 2010 12 13 05 24 55 31.3200 -97.3300 251.000 122.0 135.190 3.970 -999.990 -999.990 1.352 ..P WKT 2010 12 13 05 29 55 31.3200 -97.3300 251.000 457.0 132.600 3.730 -999.990 -999.990 1.326 ..P WKT 2010 12 13 05 39 55 31.3200 -97.3300 251.000 30.0 131.812 5.670 -999.990 -999.990 1.318 ..P WKT 2010 12 13 05 44 55 31.3200 -97.3300 251.000 122.0 147.176 3.590 -999.990 -999.990 1.472 ..P WKT 2010 12 13 05 49 55 31.3200 -97.3300 251.000 457.0 134.603 3.020 -999.990 -999.990 1.346 ..P WKT 2010 12 13 05 54 55 31.3200 -97.3300 251.000 30.0 137.762 3.400 -999.990 -999.990 1.378 ..P WKT 2010 12 13 05 59 55 31.3200 -97.3300 251.000 122.0 137.937 3.090 -999.990 -999.990 1.379 ..P WKT 2010 12 13 06 04 55 31.3200 -97.3300 251.000 457.0 128.617 2.870 -999.990 -999.990 1.286 ..P WKT 2010 12 13 06 14 55 31.3200 -97.3300 251.000 30.0 137.920 3.400 -999.990 -999.990 1.379 ..P WKT 2010 12 13 06 19 55 31.3200 -97.3300 251.000 122.0 140.809 3.150 -999.990 -999.990 1.408 ..P WKT 2010 12 13 06 24 55 31.3200 -97.3300 251.000 457.0 134.472 3.680 -999.990 -999.990 1.345 ..P WKT 2010 12 13 06 29 55 31.3200 -97.3300 251.000 30.0 146.044 3.670 -999.990 -999.990 1.460 ..P WKT 2010 12 13 06 34 55 31.3200 -97.3300 251.000 122.0 149.205 3.520 -999.990 -999.990 1.492 ..P WKT 2010 12 13 06 39 55 31.3200 -97.3300 251.000 457.0 136.355 3.510 -999.990 -999.990 1.364 ..P WKT 2010 12 13 06 49 55 31.3200 -97.3300 251.000 30.0 143.355 3.820 -999.990 -999.990 1.434 ..P WKT 2010 12 13 06 54 55 31.3200 -97.3300 251.000 122.0 149.366 3.410 -999.990 -999.990 1.494 ..P WKT 2010 12 13 06 59 55 31.3200 -97.3300 251.000 457.0 129.591 3.310 -999.990 -999.990 1.296 ..P WKT 2010 12 13 07 04 55 31.3200 -97.3300 251.000 30.0 134.517 5.060 -999.990 -999.990 1.345 ..P WKT 2010 12 13 07 09 55 31.3200 -97.3300 251.000 122.0 143.243 3.050 -999.990 -999.990 1.432 ..P WKT 2010 12 13 07 14 55 31.3200 -97.3300 251.000 457.0 134.460 2.770 -999.990 -999.990 1.345 ..P WKT 2010 12 13 07 24 55 31.3200 -97.3300 251.000 30.0 133.511 3.210 -999.990 -999.990 1.335 ..P WKT 2010 12 13 07 29 55 31.3200 -97.3300 251.000 122.0 143.790 3.280 -999.990 -999.990 1.438 ..P WKT 2010 12 13 07 34 55 31.3200 -97.3300 251.000 457.0 131.398 4.090 -999.990 -999.990 1.314 ..P WKT 2010 12 13 07 39 55 31.3200 -97.3300 251.000 30.0 139.913 3.770 -999.990 -999.990 1.399 ..P WKT 2010 12 13 07 44 55 31.3200 -97.3300 251.000 122.0 141.098 3.660 -999.990 -999.990 1.411 ..P WKT 2010 12 13 07 49 55 31.3200 -97.3300 251.000 457.0 133.185 3.730 -999.990 -999.990 1.332 ..P WKT 2010 12 13 07 59 55 31.3200 -97.3300 251.000 30.0 143.060 4.330 -999.990 -999.990 1.431 ..P WKT 2010 12 13 08 04 55 31.3200 -97.3300 251.000 122.0 132.876 4.730 -999.990 -999.990 1.329 ..P WKT 2010 12 13 08 09 55 31.3200 -97.3300 251.000 457.0 136.951 3.530 -999.990 -999.990 1.370 ..P WKT 2010 12 13 08 14 55 31.3200 -97.3300 251.000 30.0 149.718 3.290 -999.990 -999.990 1.497 ..P WKT 2010 12 13 08 19 55 31.3200 -97.3300 251.000 122.0 136.409 2.850 -999.990 -999.990 1.364 ..P WKT 2010 12 13 08 24 55 31.3200 -97.3300 251.000 457.0 135.595 2.830 -999.990 -999.990 1.356 ..P WKT 2010 12 13 08 34 55 31.3200 -97.3300 251.000 30.0 149.355 3.290 -999.990 -999.990 1.494 ..P WKT 2010 12 13 08 39 55 31.3200 -97.3300 251.000 122.0 155.372 3.110 -999.990 -999.990 1.554 ..P WKT 2010 12 13 08 44 55 31.3200 -97.3300 251.000 457.0 139.790 3.160 -999.990 -999.990 1.398 ..P WKT 2010 12 13 08 49 55 31.3200 -97.3300 251.000 30.0 147.166 3.240 -999.990 -999.990 1.472 ..P WKT 2010 12 13 08 54 55 31.3200 -97.3300 251.000 122.0 143.810 3.920 -999.990 -999.990 1.438 ..P WKT 2010 12 13 08 59 55 31.3200 -97.3300 251.000 457.0 133.931 3.470 -999.990 -999.990 1.339 ..P WKT 2010 12 13 09 09 55 31.3200 -97.3300 251.000 30.0 153.693 4.070 -999.990 -999.990 1.537 ..P WKT 2010 12 13 09 14 55 31.3200 -97.3300 251.000 122.0 145.018 3.230 -999.990 -999.990 1.450 ..P WKT 2010 12 13 09 19 55 31.3200 -97.3300 251.000 457.0 135.254 2.860 -999.990 -999.990 1.353 ..P WKT 2010 12 13 09 24 55 31.3200 -97.3300 251.000 30.0 144.515 3.090 -999.990 -999.990 1.445 ..P WKT 2010 12 13 09 29 55 31.3200 -97.3300 251.000 122.0 141.274 2.230 -999.990 -999.990 1.413 ..P WKT 2010 12 13 09 34 55 31.3200 -97.3300 251.000 457.0 131.509 2.500 -999.990 -999.990 1.315 ..P WKT 2010 12 13 09 44 55 31.3200 -97.3300 251.000 30.0 158.617 5.260 -999.990 -999.990 1.586 ..P WKT 2010 12 13 09 49 55 31.3200 -97.3300 251.000 122.0 139.491 2.890 -999.990 -999.990 1.395 ..P WKT 2010 12 13 09 54 55 31.3200 -97.3300 251.000 457.0 133.686 2.250 -999.990 -999.990 1.337 ..P WKT 2010 12 13 09 59 55 31.3200 -97.3300 251.000 30.0 153.981 3.340 -999.990 -999.990 1.540 ..P WKT 2010 12 13 10 04 55 31.3200 -97.3300 251.000 122.0 139.203 2.590 -999.990 -999.990 1.392 ..P WKT 2010 12 13 10 09 55 31.3200 -97.3300 251.000 457.0 130.678 1.890 -999.990 -999.990 1.307 ..P WKT 2010 12 13 10 19 55 31.3200 -97.3300 251.000 30.0 156.474 2.500 -999.990 -999.990 1.565 ..P WKT 2010 12 13 10 24 55 31.3200 -97.3300 251.000 122.0 153.270 3.430 -999.990 -999.990 1.533 ..P WKT 2010 12 13 10 29 55 31.3200 -97.3300 251.000 457.0 135.925 2.690 -999.990 -999.990 1.359 ..P WKT 2010 12 13 10 34 55 31.3200 -97.3300 251.000 30.0 157.198 2.740 -999.990 -999.990 1.572 ..P WKT 2010 12 13 10 39 55 31.3200 -97.3300 251.000 122.0 133.867 5.110 -999.990 -999.990 1.339 ..P WKT 2010 12 13 10 44 55 31.3200 -97.3300 251.000 457.0 132.295 2.590 -999.990 -999.990 1.323 ..P WKT 2010 12 13 10 54 55 31.3200 -97.3300 251.000 30.0 163.092 4.380 -999.990 -999.990 1.631 ..P WKT 2010 12 13 10 59 55 31.3200 -97.3300 251.000 122.0 136.163 3.480 -999.990 -999.990 1.362 ..P WKT 2010 12 13 11 04 55 31.3200 -97.3300 251.000 457.0 135.348 3.150 -999.990 -999.990 1.353 ..P WKT 2010 12 13 11 09 55 31.3200 -97.3300 251.000 30.0 163.643 3.130 -999.990 -999.990 1.636 ..P WKT 2010 12 13 11 14 55 31.3200 -97.3300 251.000 122.0 136.029 2.930 -999.990 -999.990 1.360 ..P WKT 2010 12 13 11 19 55 31.3200 -97.3300 251.000 457.0 136.574 3.890 -999.990 -999.990 1.366 ..P WKT 2010 12 13 11 29 55 31.3200 -97.3300 251.000 30.0 161.408 3.680 -999.990 -999.990 1.614 ..P WKT 2010 12 13 11 34 55 31.3200 -97.3300 251.000 122.0 135.085 2.820 -999.990 -999.990 1.351 ..P WKT 2010 12 13 11 39 55 31.3200 -97.3300 251.000 457.0 129.578 4.670 -999.990 -999.990 1.296 ..P WKT 2010 12 13 11 44 55 31.3200 -97.3300 251.000 30.0 165.436 4.460 -999.990 -999.990 1.654 ..P WKT 2010 12 13 11 49 55 31.3200 -97.3300 251.000 122.0 134.210 3.000 -999.990 -999.990 1.342 ..P WKT 2010 12 13 12 09 55 31.3200 -97.3300 251.000 457.0 126.996 2.900 -999.990 -999.990 1.270 ..P WKT 2010 12 13 12 10 25 31.3200 -97.3300 251.000 457.0 128.098 2.950 -999.990 -999.990 1.281 ..P WKT 2010 12 13 12 10 55 31.3200 -97.3300 251.000 457.0 130.969 2.500 -999.990 -999.990 1.310 ..P WKT 2010 12 13 12 11 25 31.3200 -97.3300 251.000 457.0 129.623 3.150 -999.990 -999.990 1.296 ..P WKT 2010 12 13 12 11 55 31.3200 -97.3300 251.000 457.0 127.053 2.860 -999.990 -999.990 1.271 ..P WKT 2010 12 13 12 12 25 31.3200 -97.3300 251.000 457.0 125.707 3.890 -999.990 -999.990 1.257 ..P WKT 2010 12 13 12 12 55 31.3200 -97.3300 251.000 457.0 133.338 2.520 -999.990 -999.990 1.333 ..P WKT 2010 12 13 12 13 25 31.3200 -97.3300 251.000 457.0 135.665 3.010 -999.990 -999.990 1.357 ..P WKT 2010 12 13 12 13 55 31.3200 -97.3300 251.000 457.0 131.326 4.980 -999.990 -999.990 1.313 ..P WKT 2010 12 13 12 14 25 31.3200 -97.3300 251.000 457.0 129.300 3.780 -999.990 -999.990 1.293 ..P WKT 2010 12 13 12 14 55 31.3200 -97.3300 251.000 457.0 127.003 3.040 -999.990 -999.990 1.270 ..P WKT 2010 12 13 12 19 55 31.3200 -97.3300 251.000 30.0 163.584 2.880 -999.990 -999.990 1.636 ..P WKT 2010 12 13 12 24 55 31.3200 -97.3300 251.000 122.0 146.183 2.550 -999.990 -999.990 1.462 ..P WKT 2010 12 13 12 29 55 31.3200 -97.3300 251.000 457.0 128.655 2.290 -999.990 -999.990 1.287 ..P WKT 2010 12 13 12 34 55 31.3200 -97.3300 251.000 30.0 169.963 3.010 -999.990 -999.990 1.700 ..P WKT 2010 12 13 12 39 55 31.3200 -97.3300 251.000 122.0 150.536 2.390 -999.990 -999.990 1.505 ..P WKT 2010 12 13 12 44 55 31.3200 -97.3300 251.000 457.0 131.663 2.350 -999.990 -999.990 1.317 ..P WKT 2010 12 13 12 54 55 31.3200 -97.3300 251.000 30.0 168.178 3.390 -999.990 -999.990 1.682 ..P WKT 2010 12 13 12 59 55 31.3200 -97.3300 251.000 122.0 179.701 3.170 -999.990 -999.990 1.797 ..P WKT 2010 12 13 13 04 55 31.3200 -97.3300 251.000 457.0 129.225 3.590 -999.990 -999.990 1.292 ..P WKT 2010 12 13 13 09 55 31.3200 -97.3300 251.000 30.0 165.843 2.510 -999.990 -999.990 1.658 ..P WKT 2010 12 13 13 14 55 31.3200 -97.3300 251.000 122.0 194.578 3.470 -999.990 -999.990 1.946 ..P WKT 2010 12 13 13 19 55 31.3200 -97.3300 251.000 457.0 135.189 2.330 -999.990 -999.990 1.352 ..P WKT 2010 12 13 13 29 55 31.3200 -97.3300 251.000 30.0 190.465 2.590 -999.990 -999.990 1.905 ..P WKT 2010 12 13 13 34 55 31.3200 -97.3300 251.000 122.0 189.636 4.520 -999.990 -999.990 1.896 ..P WKT 2010 12 13 13 39 55 31.3200 -97.3300 251.000 457.0 126.789 2.560 -999.990 -999.990 1.268 ..P WKT 2010 12 13 13 44 55 31.3200 -97.3300 251.000 30.0 168.758 2.690 -999.990 -999.990 1.688 ..P WKT 2010 12 13 13 49 55 31.3200 -97.3300 251.000 122.0 188.238 2.650 -999.990 -999.990 1.882 ..P WKT 2010 12 13 13 54 55 31.3200 -97.3300 251.000 457.0 132.744 2.360 -999.990 -999.990 1.327 ..P WKT 2010 12 13 14 04 55 31.3200 -97.3300 251.000 30.0 185.064 2.400 -999.990 -999.990 1.851 ..P WKT 2010 12 13 14 09 55 31.3200 -97.3300 251.000 122.0 166.236 3.080 -999.990 -999.990 1.662 ..P WKT 2010 12 13 14 14 55 31.3200 -97.3300 251.000 457.0 136.063 3.140 -999.990 -999.990 1.361 ..P WKT 2010 12 13 14 19 55 31.3200 -97.3300 251.000 30.0 166.449 2.730 -999.990 -999.990 1.664 ..P WKT 2010 12 13 14 24 55 31.3200 -97.3300 251.000 122.0 142.777 2.800 -999.990 -999.990 1.428 ..P WKT 2010 12 13 14 29 55 31.3200 -97.3300 251.000 457.0 128.841 2.380 -999.990 -999.990 1.288 ..P WKT 2010 12 13 14 39 55 31.3200 -97.3300 251.000 30.0 167.049 3.230 -999.990 -999.990 1.670 ..P WKT 2010 12 13 14 44 55 31.3200 -97.3300 251.000 122.0 153.022 4.400 -999.990 -999.990 1.530 ..P WKT 2010 12 13 14 49 55 31.3200 -97.3300 251.000 457.0 137.382 2.770 -999.990 -999.990 1.374 ..P WKT 2010 12 13 14 54 55 31.3200 -97.3300 251.000 30.0 179.491 3.940 -999.990 -999.990 1.795 ..P WKT 2010 12 13 14 59 55 31.3200 -97.3300 251.000 122.0 178.823 4.840 -999.990 -999.990 1.788 ..P WKT 2010 12 13 15 04 55 31.3200 -97.3300 251.000 457.0 135.681 5.150 -999.990 -999.990 1.357 ..P WKT 2010 12 13 15 14 55 31.3200 -97.3300 251.000 30.0 173.626 3.930 -999.990 -999.990 1.736 ..P WKT 2010 12 13 15 19 55 31.3200 -97.3300 251.000 122.0 171.382 4.490 -999.990 -999.990 1.714 ..P WKT 2010 12 13 15 24 55 31.3200 -97.3300 251.000 457.0 131.691 3.340 -999.990 -999.990 1.317 ..P WKT 2010 12 13 15 29 55 31.3200 -97.3300 251.000 30.0 167.571 3.600 -999.990 -999.990 1.676 ..P WKT 2010 12 13 15 34 55 31.3200 -97.3300 251.000 122.0 161.561 3.870 -999.990 -999.990 1.616 ..P WKT 2010 12 13 15 39 55 31.3200 -97.3300 251.000 457.0 133.344 3.050 -999.990 -999.990 1.333 ..P WKT 2010 12 13 15 49 55 31.3200 -97.3300 251.000 30.0 166.611 3.530 -999.990 -999.990 1.666 ..P WKT 2010 12 13 15 54 55 31.3200 -97.3300 251.000 122.0 160.396 2.840 -999.990 -999.990 1.604 ..P WKT 2010 12 13 15 59 55 31.3200 -97.3300 251.000 457.0 141.005 3.460 -999.990 -999.990 1.410 ..P WKT 2010 12 13 16 04 55 31.3200 -97.3300 251.000 30.0 161.552 3.940 -999.990 -999.990 1.616 ..P WKT 2010 12 13 16 09 55 31.3200 -97.3300 251.000 122.0 159.106 3.240 -999.990 -999.990 1.591 ..P WKT 2010 12 13 16 14 55 31.3200 -97.3300 251.000 457.0 135.968 3.200 -999.990 -999.990 1.360 ..P WKT 2010 12 13 16 24 55 31.3200 -97.3300 251.000 30.0 158.277 3.370 -999.990 -999.990 1.583 ..P WKT 2010 12 13 16 29 55 31.3200 -97.3300 251.000 122.0 163.411 3.100 -999.990 -999.990 1.634 ..P WKT 2010 12 13 16 34 55 31.3200 -97.3300 251.000 457.0 134.043 4.570 -999.990 -999.990 1.340 ..P WKT 2010 12 13 16 39 55 31.3200 -97.3300 251.000 30.0 149.380 5.430 -999.990 -999.990 1.494 ..P WKT 2010 12 13 16 44 55 31.3200 -97.3300 251.000 122.0 153.036 4.780 -999.990 -999.990 1.530 ..P WKT 2010 12 13 16 49 55 31.3200 -97.3300 251.000 457.0 129.997 3.490 -999.990 -999.990 1.300 ..P WKT 2010 12 13 17 04 55 31.3200 -97.3300 251.000 30.0 151.203 4.570 -999.990 -999.990 1.512 ..P WKT 2010 12 13 17 09 55 31.3200 -97.3300 251.000 122.0 152.667 6.300 -999.990 -999.990 1.527 ..P WKT 2010 12 13 17 14 55 31.3200 -97.3300 251.000 457.0 125.460 5.380 -999.990 -999.990 1.255 ..P WKT 2010 12 13 17 19 55 31.3200 -97.3300 251.000 30.0 151.306 4.060 -999.990 -999.990 1.513 ..P WKT 2010 12 13 17 24 55 31.3200 -97.3300 251.000 122.0 151.698 3.490 -999.990 -999.990 1.517 ..P WKT 2010 12 13 17 29 55 31.3200 -97.3300 251.000 457.0 134.686 2.600 -999.990 -999.990 1.347 ..P WKT 2010 12 13 17 39 55 31.3200 -97.3300 251.000 30.0 154.884 3.150 -999.990 -999.990 1.549 ..P WKT 2010 12 13 17 44 55 31.3200 -97.3300 251.000 122.0 156.750 3.600 -999.990 -999.990 1.568 ..P WKT 2010 12 13 17 49 55 31.3200 -97.3300 251.000 457.0 134.543 4.150 -999.990 -999.990 1.345 ..P WKT 2010 12 13 17 54 55 31.3200 -97.3300 251.000 30.0 161.550 3.510 -999.990 -999.990 1.616 ..P WKT 2010 12 13 17 59 55 31.3200 -97.3300 251.000 122.0 161.809 2.840 -999.990 -999.990 1.618 ..P WKT 2010 12 13 18 04 55 31.3200 -97.3300 251.000 457.0 131.599 2.610 -999.990 -999.990 1.316 ..P WKT 2010 12 13 18 14 55 31.3200 -97.3300 251.000 30.0 151.443 2.920 -999.990 -999.990 1.514 ..P WKT 2010 12 13 18 19 55 31.3200 -97.3300 251.000 122.0 159.794 2.690 -999.990 -999.990 1.598 ..P WKT 2010 12 13 18 24 55 31.3200 -97.3300 251.000 457.0 137.701 3.640 -999.990 -999.990 1.377 ..P WKT 2010 12 13 18 29 55 31.3200 -97.3300 251.000 30.0 149.788 2.850 -999.990 -999.990 1.498 ..P WKT 2010 12 13 18 34 55 31.3200 -97.3300 251.000 122.0 151.994 2.780 -999.990 -999.990 1.520 ..P WKT 2010 12 13 18 39 55 31.3200 -97.3300 251.000 457.0 156.067 2.960 -999.990 -999.990 1.561 ..P WKT 2010 12 13 18 49 55 31.3200 -97.3300 251.000 30.0 154.186 3.300 -999.990 -999.990 1.542 ..P WKT 2010 12 13 18 54 55 31.3200 -97.3300 251.000 122.0 153.838 3.600 -999.990 -999.990 1.538 ..P WKT 2010 12 13 18 59 55 31.3200 -97.3300 251.000 457.0 152.689 3.420 -999.990 -999.990 1.527 ..P WKT 2010 12 13 19 04 55 31.3200 -97.3300 251.000 30.0 154.207 3.450 -999.990 -999.990 1.542 ..P WKT 2010 12 13 19 09 55 31.3200 -97.3300 251.000 122.0 152.526 2.960 -999.990 -999.990 1.525 ..P WKT 2010 12 13 19 14 55 31.3200 -97.3300 251.000 457.0 150.314 2.960 -999.990 -999.990 1.503 ..P WKT 2010 12 13 19 24 55 31.3200 -97.3300 251.000 30.0 157.967 2.790 -999.990 -999.990 1.580 ..P WKT 2010 12 13 19 29 55 31.3200 -97.3300 251.000 122.0 155.716 2.760 -999.990 -999.990 1.557 ..P WKT 2010 12 13 19 34 55 31.3200 -97.3300 251.000 457.0 140.961 4.450 -999.990 -999.990 1.410 ..P WKT 2010 12 13 19 39 55 31.3200 -97.3300 251.000 30.0 152.283 3.290 -999.990 -999.990 1.523 ..P WKT 2010 12 13 19 44 55 31.3200 -97.3300 251.000 122.0 153.227 3.320 -999.990 -999.990 1.532 ..P WKT 2010 12 13 19 49 55 31.3200 -97.3300 251.000 457.0 141.541 3.070 -999.990 -999.990 1.415 ..P WKT 2010 12 13 19 59 55 31.3200 -97.3300 251.000 30.0 146.263 2.990 -999.990 -999.990 1.463 ..P WKT 2010 12 13 20 04 55 31.3200 -97.3300 251.000 122.0 144.455 3.540 -999.990 -999.990 1.445 ..P WKT 2010 12 13 20 09 55 31.3200 -97.3300 251.000 457.0 136.673 3.430 -999.990 -999.990 1.367 ..P WKT 2010 12 13 20 14 55 31.3200 -97.3300 251.000 30.0 144.163 3.110 -999.990 -999.990 1.442 ..P WKT 2010 12 13 20 19 55 31.3200 -97.3300 251.000 122.0 147.536 3.640 -999.990 -999.990 1.475 ..P WKT 2010 12 13 20 24 55 31.3200 -97.3300 251.000 457.0 142.811 3.530 -999.990 -999.990 1.428 ..P WKT 2010 12 13 20 34 55 31.3200 -97.3300 251.000 30.0 140.132 3.350 -999.990 -999.990 1.401 ..P WKT 2010 12 13 20 39 55 31.3200 -97.3300 251.000 122.0 139.656 3.480 -999.990 -999.990 1.397 ..P WKT 2010 12 13 20 44 55 31.3200 -97.3300 251.000 457.0 140.374 2.970 -999.990 -999.990 1.404 ..P WKT 2010 12 13 20 49 55 31.3200 -97.3300 251.000 30.0 145.332 2.890 -999.990 -999.990 1.453 ..P WKT 2010 12 13 20 54 55 31.3200 -97.3300 251.000 122.0 140.747 2.730 -999.990 -999.990 1.407 ..P WKT 2010 12 13 20 59 55 31.3200 -97.3300 251.000 457.0 137.488 3.160 -999.990 -999.990 1.375 ..P WKT 2010 12 13 21 09 55 31.3200 -97.3300 251.000 30.0 137.107 3.370 -999.990 -999.990 1.371 ..P WKT 2010 12 13 21 14 55 31.3200 -97.3300 251.000 122.0 143.686 3.040 -999.990 -999.990 1.437 ..P WKT 2010 12 13 21 19 55 31.3200 -97.3300 251.000 457.0 142.851 2.840 -999.990 -999.990 1.429 ..P WKT 2010 12 13 21 24 55 31.3200 -97.3300 251.000 30.0 151.808 3.370 -999.990 -999.990 1.518 ..P WKT 2010 12 13 21 29 55 31.3200 -97.3300 251.000 122.0 147.002 3.470 -999.990 -999.990 1.470 ..P WKT 2010 12 13 21 34 55 31.3200 -97.3300 251.000 457.0 147.754 2.840 -999.990 -999.990 1.478 ..P WKT 2010 12 13 21 44 55 31.3200 -97.3300 251.000 30.0 155.865 4.190 -999.990 -999.990 1.559 ..P WKT 2010 12 13 21 49 55 31.3200 -97.3300 251.000 122.0 160.050 3.160 -999.990 -999.990 1.601 ..P WKT 2010 12 13 21 54 55 31.3200 -97.3300 251.000 457.0 157.627 3.320 -999.990 -999.990 1.576 ..P WKT 2010 12 13 21 59 55 31.3200 -97.3300 251.000 30.0 154.147 3.080 -999.990 -999.990 1.541 ..P WKT 2010 12 13 22 04 55 31.3200 -97.3300 251.000 122.0 161.235 2.810 -999.990 -999.990 1.612 ..P WKT 2010 12 13 22 09 55 31.3200 -97.3300 251.000 457.0 169.904 3.990 -999.990 -999.990 1.699 ..P WKT 2010 12 13 22 19 55 31.3200 -97.3300 251.000 30.0 176.031 3.330 -999.990 -999.990 1.760 ..P WKT 2010 12 13 22 24 55 31.3200 -97.3300 251.000 122.0 179.298 3.200 -999.990 -999.990 1.793 ..P WKT 2010 12 13 22 29 55 31.3200 -97.3300 251.000 457.0 187.842 3.060 -999.990 -999.990 1.878 ..P WKT 2010 12 13 22 34 55 31.3200 -97.3300 251.000 30.0 183.192 3.280 -999.990 -999.990 1.832 ..P WKT 2010 12 13 22 39 55 31.3200 -97.3300 251.000 122.0 175.119 3.110 -999.990 -999.990 1.751 ..P WKT 2010 12 13 22 44 55 31.3200 -97.3300 251.000 457.0 175.220 3.160 -999.990 -999.990 1.752 ..P WKT 2010 12 13 22 54 55 31.3200 -97.3300 251.000 30.0 163.793 3.020 -999.990 -999.990 1.638 ..P WKT 2010 12 13 22 59 55 31.3200 -97.3300 251.000 122.0 159.645 3.170 -999.990 -999.990 1.596 ..P WKT 2010 12 13 23 04 55 31.3200 -97.3300 251.000 457.0 169.194 4.910 -999.990 -999.990 1.692 ..P WKT 2010 12 13 23 09 55 31.3200 -97.3300 251.000 30.0 159.518 3.430 -999.990 -999.990 1.595 ..P WKT 2010 12 13 23 14 55 31.3200 -97.3300 251.000 122.0 153.005 3.240 -999.990 -999.990 1.530 ..P WKT 2010 12 13 23 19 55 31.3200 -97.3300 251.000 457.0 155.969 3.350 -999.990 -999.990 1.560 ..P WKT 2010 12 13 23 29 55 31.3200 -97.3300 251.000 30.0 153.413 3.540 -999.990 -999.990 1.534 ..P WKT 2010 12 13 23 34 55 31.3200 -97.3300 251.000 122.0 158.678 3.790 -999.990 -999.990 1.587 ..P WKT 2010 12 13 23 39 55 31.3200 -97.3300 251.000 457.0 162.364 3.520 -999.990 -999.990 1.624 ..P WKT 2010 12 13 23 44 55 31.3200 -97.3300 251.000 30.0 159.871 4.670 -999.990 -999.990 1.599 ..P WKT 2010 12 13 23 49 55 31.3200 -97.3300 251.000 122.0 155.145 4.340 -999.990 -999.990 1.551 ..P WKT 2010 12 14 00 09 55 31.3200 -97.3300 251.000 457.0 154.340 3.360 -999.990 -999.990 1.543 ..P WKT 2010 12 14 00 10 25 31.3200 -97.3300 251.000 457.0 154.119 3.180 -999.990 -999.990 1.541 ..P WKT 2010 12 14 00 10 55 31.3200 -97.3300 251.000 457.0 160.598 3.800 -999.990 -999.990 1.606 ..P WKT 2010 12 14 00 11 25 31.3200 -97.3300 251.000 457.0 157.750 3.790 -999.990 -999.990 1.578 ..P WKT 2010 12 14 00 11 55 31.3200 -97.3300 251.000 457.0 153.851 3.240 -999.990 -999.990 1.539 ..P WKT 2010 12 14 00 12 25 31.3200 -97.3300 251.000 457.0 156.784 4.190 -999.990 -999.990 1.568 ..P WKT 2010 12 14 00 12 55 31.3200 -97.3300 251.000 457.0 157.745 3.370 -999.990 -999.990 1.577 ..P WKT 2010 12 14 00 13 25 31.3200 -97.3300 251.000 457.0 158.970 3.630 -999.990 -999.990 1.590 ..P WKT 2010 12 14 00 13 55 31.3200 -97.3300 251.000 457.0 158.749 4.100 -999.990 -999.990 1.587 ..P WKT 2010 12 14 00 14 25 31.3200 -97.3300 251.000 457.0 153.143 3.990 -999.990 -999.990 1.531 ..P WKT 2010 12 14 00 14 55 31.3200 -97.3300 251.000 457.0 155.286 4.560 -999.990 -999.990 1.553 ..P WKT 2010 12 14 00 19 55 31.3200 -97.3300 251.000 30.0 152.949 4.380 -999.990 -999.990 1.529 ..P WKT 2010 12 14 00 24 55 31.3200 -97.3300 251.000 122.0 146.932 4.740 -999.990 -999.990 1.469 ..P WKT 2010 12 14 00 29 55 31.3200 -97.3300 251.000 457.0 161.019 4.090 -999.990 -999.990 1.610 ..P WKT 2010 12 14 00 34 55 31.3200 -97.3300 251.000 30.0 162.098 3.690 -999.990 -999.990 1.621 ..P WKT 2010 12 14 00 39 55 31.3200 -97.3300 251.000 122.0 140.177 3.310 -999.990 -999.990 1.402 ..P WKT 2010 12 14 00 44 55 31.3200 -97.3300 251.000 457.0 162.154 3.580 -999.990 -999.990 1.622 ..P WKT 2010 12 14 00 54 55 31.3200 -97.3300 251.000 30.0 162.046 4.200 -999.990 -999.990 1.620 ..P WKT 2010 12 14 00 59 55 31.3200 -97.3300 251.000 122.0 138.242 3.840 -999.990 -999.990 1.382 ..P WKT 2010 12 14 01 04 55 31.3200 -97.3300 251.000 457.0 155.987 5.370 -999.990 -999.990 1.560 ..P WKT 2010 12 14 01 09 55 31.3200 -97.3300 251.000 30.0 157.296 4.380 -999.990 -999.990 1.573 ..P WKT 2010 12 14 01 14 55 31.3200 -97.3300 251.000 122.0 142.033 3.090 -999.990 -999.990 1.420 ..P WKT 2010 12 14 01 19 55 31.3200 -97.3300 251.000 457.0 165.176 4.470 -999.990 -999.990 1.652 ..P WKT 2010 12 14 01 29 55 31.3200 -97.3300 251.000 30.0 150.826 2.800 -999.990 -999.990 1.508 ..P WKT 2010 12 14 01 34 55 31.3200 -97.3300 251.000 122.0 145.425 3.960 -999.990 -999.990 1.454 ..P WKT 2010 12 14 01 39 55 31.3200 -97.3300 251.000 457.0 184.237 3.580 -999.990 -999.990 1.842 ..P WKT 2010 12 14 01 44 55 31.3200 -97.3300 251.000 30.0 154.886 3.280 -999.990 -999.990 1.549 ..P WKT 2010 12 14 01 49 55 31.3200 -97.3300 251.000 122.0 153.169 3.460 -999.990 -999.990 1.532 ..P WKT 2010 12 14 01 54 55 31.3200 -97.3300 251.000 457.0 194.628 4.090 -999.990 -999.990 1.946 ..P WKT 2010 12 14 02 04 55 31.3200 -97.3300 251.000 30.0 152.116 3.740 -999.990 -999.990 1.521 ..P WKT 2010 12 14 02 09 55 31.3200 -97.3300 251.000 122.0 152.655 3.040 -999.990 -999.990 1.527 ..P WKT 2010 12 14 02 14 55 31.3200 -97.3300 251.000 457.0 180.586 3.790 -999.990 -999.990 1.806 ..P WKT 2010 12 14 02 19 55 31.3200 -97.3300 251.000 30.0 154.260 3.170 -999.990 -999.990 1.543 ..P WKT 2010 12 14 02 24 55 31.3200 -97.3300 251.000 122.0 173.767 3.480 -999.990 -999.990 1.738 ..P WKT 2010 12 14 02 29 55 31.3200 -97.3300 251.000 457.0 165.615 3.270 -999.990 -999.990 1.656 ..P WKT 2010 12 14 02 39 55 31.3200 -97.3300 251.000 30.0 165.228 3.000 -999.990 -999.990 1.652 ..P WKT 2010 12 14 02 44 55 31.3200 -97.3300 251.000 122.0 164.037 3.350 -999.990 -999.990 1.640 ..P WKT 2010 12 14 02 49 55 31.3200 -97.3300 251.000 457.0 153.094 3.010 -999.990 -999.990 1.531 ..P WKT 2010 12 14 02 54 55 31.3200 -97.3300 251.000 30.0 167.981 3.370 -999.990 -999.990 1.680 ..P WKT 2010 12 14 02 59 55 31.3200 -97.3300 251.000 122.0 174.699 3.430 -999.990 -999.990 1.747 ..P WKT 2010 12 14 03 04 55 31.3200 -97.3300 251.000 457.0 156.899 3.630 -999.990 -999.990 1.569 ..P WKT 2010 12 14 03 14 55 31.3200 -97.3300 251.000 30.0 167.774 4.360 -999.990 -999.990 1.678 ..P WKT 2010 12 14 03 19 55 31.3200 -97.3300 251.000 122.0 174.570 3.720 -999.990 -999.990 1.746 ..P WKT 2010 12 14 03 24 55 31.3200 -97.3300 251.000 457.0 150.375 4.340 -999.990 -999.990 1.504 ..P WKT 2010 12 14 03 29 55 31.3200 -97.3300 251.000 30.0 168.909 4.040 -999.990 -999.990 1.689 ..P WKT 2010 12 14 03 34 55 31.3200 -97.3300 251.000 122.0 162.121 3.960 -999.990 -999.990 1.621 ..P WKT 2010 12 14 03 39 55 31.3200 -97.3300 251.000 457.0 150.581 3.910 -999.990 -999.990 1.506 ..P WKT 2010 12 14 03 49 55 31.3200 -97.3300 251.000 30.0 178.391 4.790 -999.990 -999.990 1.784 ..P WKT 2010 12 14 03 54 55 31.3200 -97.3300 251.000 122.0 171.035 4.570 -999.990 -999.990 1.710 ..P WKT 2010 12 14 03 59 55 31.3200 -97.3300 251.000 457.0 140.318 4.180 -999.990 -999.990 1.403 ..P WKT 2010 12 14 04 04 55 31.3200 -97.3300 251.000 30.0 175.722 4.880 -999.990 -999.990 1.757 ..P WKT 2010 12 14 04 09 55 31.3200 -97.3300 251.000 122.0 167.308 4.210 -999.990 -999.990 1.673 ..P WKT 2010 12 14 04 14 55 31.3200 -97.3300 251.000 457.0 136.976 4.100 -999.990 -999.990 1.370 ..P WKT 2010 12 14 04 24 55 31.3200 -97.3300 251.000 30.0 186.120 3.720 -999.990 -999.990 1.861 ..P WKT 2010 12 14 04 29 55 31.3200 -97.3300 251.000 122.0 179.117 3.790 -999.990 -999.990 1.791 ..P WKT 2010 12 14 04 34 55 31.3200 -97.3300 251.000 457.0 134.604 4.700 -999.990 -999.990 1.346 ..P WKT 2010 12 14 04 39 55 31.3200 -97.3300 251.000 30.0 169.335 3.670 -999.990 -999.990 1.693 ..P WKT 2010 12 14 04 44 55 31.3200 -97.3300 251.000 122.0 169.199 4.400 -999.990 -999.990 1.692 ..P WKT 2010 12 14 04 49 55 31.3200 -97.3300 251.000 457.0 132.334 4.950 -999.990 -999.990 1.323 ..P WKT 2010 12 14 05 04 55 31.3200 -97.3300 251.000 30.0 169.615 3.210 -999.990 -999.990 1.696 ..P WKT 2010 12 14 05 09 55 31.3200 -97.3300 251.000 122.0 169.629 3.380 -999.990 -999.990 1.696 ..P WKT 2010 12 14 05 14 55 31.3200 -97.3300 251.000 457.0 128.269 3.960 -999.990 -999.990 1.283 ..P WKT 2010 12 14 05 19 55 31.3200 -97.3300 251.000 30.0 170.584 4.390 -999.990 -999.990 1.706 ..P WKT 2010 12 14 05 24 55 31.3200 -97.3300 251.000 122.0 177.208 3.450 -999.990 -999.990 1.772 ..P WKT 2010 12 14 05 29 55 31.3200 -97.3300 251.000 457.0 124.465 3.060 -999.990 -999.990 1.245 ..P WKT 2010 12 14 05 39 55 31.3200 -97.3300 251.000 30.0 142.906 3.360 -999.990 -999.990 1.429 ..P WKT 2010 12 14 05 44 55 31.3200 -97.3300 251.000 122.0 185.017 4.970 -999.990 -999.990 1.850 ..P WKT 2010 12 14 05 49 55 31.3200 -97.3300 251.000 457.0 128.188 3.710 -999.990 -999.990 1.282 ..P WKT 2010 12 14 05 54 55 31.3200 -97.3300 251.000 30.0 154.960 3.830 -999.990 -999.990 1.550 ..P WKT 2010 12 14 05 59 55 31.3200 -97.3300 251.000 122.0 164.537 4.410 -999.990 -999.990 1.645 ..P WKT 2010 12 14 06 04 55 31.3200 -97.3300 251.000 457.0 130.978 2.720 -999.990 -999.990 1.310 ..P WKT 2010 12 14 06 14 55 31.3200 -97.3300 251.000 30.0 144.725 2.890 -999.990 -999.990 1.447 ..P WKT 2010 12 14 06 19 55 31.3200 -97.3300 251.000 122.0 171.400 3.290 -999.990 -999.990 1.714 ..P WKT 2010 12 14 06 24 55 31.3200 -97.3300 251.000 457.0 129.772 3.320 -999.990 -999.990 1.298 ..P WKT 2010 12 14 06 29 55 31.3200 -97.3300 251.000 30.0 145.858 4.720 -999.990 -999.990 1.459 ..P WKT 2010 12 14 06 34 55 31.3200 -97.3300 251.000 122.0 184.723 3.640 -999.990 -999.990 1.847 ..P WKT 2010 12 14 06 39 55 31.3200 -97.3300 251.000 457.0 130.634 2.480 -999.990 -999.990 1.306 ..P WKT 2010 12 14 06 49 55 31.3200 -97.3300 251.000 30.0 142.197 4.600 -999.990 -999.990 1.422 ..P WKT 2010 12 14 06 54 55 31.3200 -97.3300 251.000 122.0 176.346 3.260 -999.990 -999.990 1.763 ..P WKT 2010 12 14 06 59 55 31.3200 -97.3300 251.000 457.0 134.461 3.440 -999.990 -999.990 1.345 ..P WKT 2010 12 14 07 04 55 31.3200 -97.3300 251.000 30.0 145.563 4.020 -999.990 -999.990 1.456 ..P WKT 2010 12 14 07 09 55 31.3200 -97.3300 251.000 122.0 165.942 3.670 -999.990 -999.990 1.659 ..P WKT 2010 12 14 07 14 55 31.3200 -97.3300 251.000 457.0 135.969 3.970 -999.990 -999.990 1.360 ..P WKT 2010 12 14 07 24 55 31.3200 -97.3300 251.000 30.0 149.586 3.880 -999.990 -999.990 1.496 ..P WKT 2010 12 14 07 29 55 31.3200 -97.3300 251.000 122.0 170.127 4.020 -999.990 -999.990 1.701 ..P WKT 2010 12 14 07 34 55 31.3200 -97.3300 251.000 457.0 131.809 4.720 -999.990 -999.990 1.318 ..P WKT 2010 12 14 07 39 55 31.3200 -97.3300 251.000 30.0 149.699 3.790 -999.990 -999.990 1.497 ..P WKT 2010 12 14 07 44 55 31.3200 -97.3300 251.000 122.0 162.953 3.880 -999.990 -999.990 1.630 ..P WKT 2010 12 14 07 49 55 31.3200 -97.3300 251.000 457.0 142.392 3.520 -999.990 -999.990 1.424 ..P WKT 2010 12 14 07 59 55 31.3200 -97.3300 251.000 30.0 154.467 3.330 -999.990 -999.990 1.545 ..P WKT 2010 12 14 08 04 55 31.3200 -97.3300 251.000 122.0 161.113 3.330 -999.990 -999.990 1.611 ..P WKT 2010 12 14 08 09 55 31.3200 -97.3300 251.000 457.0 132.734 4.850 -999.990 -999.990 1.327 ..P WKT 2010 12 14 08 14 55 31.3200 -97.3300 251.000 30.0 149.065 3.690 -999.990 -999.990 1.491 ..P WKT 2010 12 14 08 19 55 31.3200 -97.3300 251.000 122.0 157.172 3.580 -999.990 -999.990 1.572 ..P WKT 2010 12 14 08 24 55 31.3200 -97.3300 251.000 457.0 133.694 3.990 -999.990 -999.990 1.337 ..P WKT 2010 12 14 08 34 55 31.3200 -97.3300 251.000 30.0 143.444 3.790 -999.990 -999.990 1.434 ..P WKT 2010 12 14 08 39 55 31.3200 -97.3300 251.000 122.0 162.212 4.430 -999.990 -999.990 1.622 ..P WKT 2010 12 14 08 44 55 31.3200 -97.3300 251.000 457.0 136.639 4.010 -999.990 -999.990 1.366 ..P WKT 2010 12 14 08 49 55 31.3200 -97.3300 251.000 30.0 145.452 3.990 -999.990 -999.990 1.455 ..P WKT 2010 12 14 08 54 55 31.3200 -97.3300 251.000 122.0 162.234 4.460 -999.990 -999.990 1.622 ..P WKT 2010 12 14 08 59 55 31.3200 -97.3300 251.000 457.0 141.567 4.200 -999.990 -999.990 1.416 ..P WKT 2010 12 14 09 09 55 31.3200 -97.3300 251.000 30.0 143.108 3.570 -999.990 -999.990 1.431 ..P WKT 2010 12 14 09 14 55 31.3200 -97.3300 251.000 122.0 160.277 3.530 -999.990 -999.990 1.603 ..P WKT 2010 12 14 09 19 55 31.3200 -97.3300 251.000 457.0 129.750 4.100 -999.990 -999.990 1.298 ..P WKT 2010 12 14 09 24 55 31.3200 -97.3300 251.000 30.0 142.536 3.470 -999.990 -999.990 1.425 ..P WKT 2010 12 14 09 29 55 31.3200 -97.3300 251.000 122.0 154.527 3.690 -999.990 -999.990 1.545 ..P WKT 2010 12 14 09 34 55 31.3200 -97.3300 251.000 457.0 129.306 3.170 -999.990 -999.990 1.293 ..P WKT 2010 12 14 09 44 55 31.3200 -97.3300 251.000 30.0 145.525 2.950 -999.990 -999.990 1.455 ..P WKT 2010 12 14 09 49 55 31.3200 -97.3300 251.000 122.0 155.870 4.030 -999.990 -999.990 1.559 ..P WKT 2010 12 14 09 54 55 31.3200 -97.3300 251.000 457.0 132.177 3.640 -999.990 -999.990 1.322 ..P WKT 2010 12 14 09 59 55 31.3200 -97.3300 251.000 30.0 144.649 4.410 -999.990 -999.990 1.446 ..P WKT 2010 12 14 10 04 55 31.3200 -97.3300 251.000 122.0 164.040 4.060 -999.990 -999.990 1.640 ..P WKT 2010 12 14 10 09 55 31.3200 -97.3300 251.000 457.0 141.671 3.870 -999.990 -999.990 1.417 ..P WKT 2010 12 14 10 19 55 31.3200 -97.3300 251.000 30.0 144.849 4.040 -999.990 -999.990 1.448 ..P WKT 2010 12 14 10 24 55 31.3200 -97.3300 251.000 122.0 159.230 3.870 -999.990 -999.990 1.592 ..P WKT 2010 12 14 10 29 55 31.3200 -97.3300 251.000 457.0 128.107 4.730 -999.990 -999.990 1.281 ..P WKT 2010 12 14 10 34 55 31.3200 -97.3300 251.000 30.0 139.561 4.420 -999.990 -999.990 1.396 ..P WKT 2010 12 14 10 39 55 31.3200 -97.3300 251.000 122.0 151.817 3.270 -999.990 -999.990 1.518 ..P WKT 2010 12 14 10 44 55 31.3200 -97.3300 251.000 457.0 135.857 3.530 -999.990 -999.990 1.359 ..P WKT 2010 12 14 10 54 55 31.3200 -97.3300 251.000 30.0 147.518 3.520 -999.990 -999.990 1.475 ..P WKT 2010 12 14 10 59 55 31.3200 -97.3300 251.000 122.0 148.785 4.170 -999.990 -999.990 1.488 ..P WKT 2010 12 14 11 04 55 31.3200 -97.3300 251.000 457.0 136.205 3.960 -999.990 -999.990 1.362 ..P WKT 2010 12 14 11 09 55 31.3200 -97.3300 251.000 30.0 140.934 4.110 -999.990 -999.990 1.409 ..P WKT 2010 12 14 11 14 55 31.3200 -97.3300 251.000 122.0 146.730 3.740 -999.990 -999.990 1.467 ..P WKT 2010 12 14 11 19 55 31.3200 -97.3300 251.000 457.0 134.411 4.510 -999.990 -999.990 1.344 ..P WKT 2010 12 14 11 29 55 31.3200 -97.3300 251.000 30.0 147.230 4.560 -999.990 -999.990 1.472 ..P WKT 2010 12 14 11 34 55 31.3200 -97.3300 251.000 122.0 150.789 3.630 -999.990 -999.990 1.508 ..P WKT 2010 12 14 11 39 55 31.3200 -97.3300 251.000 457.0 139.824 3.700 -999.990 -999.990 1.398 ..P WKT 2010 12 14 11 44 55 31.3200 -97.3300 251.000 30.0 146.716 3.830 -999.990 -999.990 1.467 ..P WKT 2010 12 14 11 49 55 31.3200 -97.3300 251.000 122.0 144.813 4.190 -999.990 -999.990 1.448 ..P WKT 2010 12 14 12 09 55 31.3200 -97.3300 251.000 457.0 131.859 3.180 -999.990 -999.990 1.319 ..P WKT 2010 12 14 12 10 25 31.3200 -97.3300 251.000 457.0 133.070 3.150 -999.990 -999.990 1.331 ..P WKT 2010 12 14 12 10 55 31.3200 -97.3300 251.000 457.0 136.281 4.200 -999.990 -999.990 1.363 ..P WKT 2010 12 14 12 11 25 31.3200 -97.3300 251.000 457.0 141.760 3.120 -999.990 -999.990 1.418 ..P WKT 2010 12 14 12 11 55 31.3200 -97.3300 251.000 457.0 137.237 3.520 -999.990 -999.990 1.372 ..P WKT 2010 12 14 12 12 25 31.3200 -97.3300 251.000 457.0 136.714 3.440 -999.990 -999.990 1.367 ..P WKT 2010 12 14 12 12 55 31.3200 -97.3300 251.000 457.0 134.991 3.370 -999.990 -999.990 1.350 ..P WKT 2010 12 14 12 13 25 31.3200 -97.3300 251.000 457.0 134.469 4.130 -999.990 -999.990 1.345 ..P WKT 2010 12 14 12 13 55 31.3200 -97.3300 251.000 457.0 140.748 3.100 -999.990 -999.990 1.407 ..P WKT 2010 12 14 12 14 25 31.3200 -97.3300 251.000 457.0 138.758 3.800 -999.990 -999.990 1.388 ..P WKT 2010 12 14 12 14 55 31.3200 -97.3300 251.000 457.0 132.367 3.570 -999.990 -999.990 1.324 ..P WKT 2010 12 14 12 19 55 31.3200 -97.3300 251.000 30.0 138.879 4.550 -999.990 -999.990 1.389 ..P WKT 2010 12 14 12 24 55 31.3200 -97.3300 251.000 122.0 137.387 4.110 -999.990 -999.990 1.374 ..P WKT 2010 12 14 12 29 55 31.3200 -97.3300 251.000 457.0 147.371 3.830 -999.990 -999.990 1.474 ..P WKT 2010 12 14 12 34 55 31.3200 -97.3300 251.000 30.0 142.277 3.310 -999.990 -999.990 1.423 ..P WKT 2010 12 14 12 39 55 31.3200 -97.3300 251.000 122.0 148.394 3.700 -999.990 -999.990 1.484 ..P WKT 2010 12 14 12 44 55 31.3200 -97.3300 251.000 457.0 155.581 3.150 -999.990 -999.990 1.556 ..P WKT 2010 12 14 12 54 55 31.3200 -97.3300 251.000 30.0 144.846 3.270 -999.990 -999.990 1.448 ..P WKT 2010 12 14 12 59 55 31.3200 -97.3300 251.000 122.0 146.150 3.510 -999.990 -999.990 1.462 ..P WKT 2010 12 14 13 04 55 31.3200 -97.3300 251.000 457.0 160.546 4.570 -999.990 -999.990 1.605 ..P WKT 2010 12 14 13 09 55 31.3200 -97.3300 251.000 30.0 143.549 3.290 -999.990 -999.990 1.435 ..P WKT 2010 12 14 13 14 55 31.3200 -97.3300 251.000 122.0 148.729 3.120 -999.990 -999.990 1.487 ..P WKT 2010 12 14 13 19 55 31.3200 -97.3300 251.000 457.0 140.679 3.120 -999.990 -999.990 1.407 ..P WKT 2010 12 14 13 29 55 31.3200 -97.3300 251.000 30.0 144.969 3.670 -999.990 -999.990 1.450 ..P WKT 2010 12 14 13 34 55 31.3200 -97.3300 251.000 122.0 147.688 3.180 -999.990 -999.990 1.477 ..P WKT 2010 12 14 13 39 55 31.3200 -97.3300 251.000 457.0 134.895 3.640 -999.990 -999.990 1.349 ..P WKT 2010 12 14 13 44 55 31.3200 -97.3300 251.000 30.0 142.696 3.840 -999.990 -999.990 1.427 ..P WKT 2010 12 14 13 49 55 31.3200 -97.3300 251.000 122.0 148.091 3.380 -999.990 -999.990 1.481 ..P WKT 2010 12 14 13 54 55 31.3200 -97.3300 251.000 457.0 132.350 3.630 -999.990 -999.990 1.323 ..P WKT 2010 12 14 14 04 55 31.3200 -97.3300 251.000 30.0 156.793 3.690 -999.990 -999.990 1.568 ..P WKT 2010 12 14 14 09 55 31.3200 -97.3300 251.000 122.0 142.384 3.400 -999.990 -999.990 1.424 ..P WKT 2010 12 14 14 14 55 31.3200 -97.3300 251.000 457.0 124.758 3.710 -999.990 -999.990 1.248 ..P WKT 2010 12 14 14 19 55 31.3200 -97.3300 251.000 30.0 144.080 3.670 -999.990 -999.990 1.441 ..P WKT 2010 12 14 14 24 55 31.3200 -97.3300 251.000 122.0 136.625 3.570 -999.990 -999.990 1.366 ..P WKT 2010 12 14 14 29 55 31.3200 -97.3300 251.000 457.0 133.723 3.780 -999.990 -999.990 1.337 ..P WKT 2010 12 14 14 39 55 31.3200 -97.3300 251.000 30.0 151.762 4.170 -999.990 -999.990 1.518 ..P WKT 2010 12 14 14 44 55 31.3200 -97.3300 251.000 122.0 145.376 4.300 -999.990 -999.990 1.454 ..P WKT 2010 12 14 14 49 55 31.3200 -97.3300 251.000 457.0 135.771 3.830 -999.990 -999.990 1.358 ..P WKT 2010 12 14 14 54 55 31.3200 -97.3300 251.000 30.0 150.291 4.120 -999.990 -999.990 1.503 ..P WKT 2010 12 14 14 59 55 31.3200 -97.3300 251.000 122.0 144.975 4.160 -999.990 -999.990 1.450 ..P WKT 2010 12 14 15 04 55 31.3200 -97.3300 251.000 457.0 126.517 3.910 -999.990 -999.990 1.265 ..P WKT 2010 12 14 15 14 55 31.3200 -97.3300 251.000 30.0 149.938 4.280 -999.990 -999.990 1.499 ..P WKT 2010 12 14 15 19 55 31.3200 -97.3300 251.000 122.0 139.387 4.250 -999.990 -999.990 1.394 ..P WKT 2010 12 14 15 24 55 31.3200 -97.3300 251.000 457.0 126.552 4.900 -999.990 -999.990 1.266 ..P WKT 2010 12 14 15 29 55 31.3200 -97.3300 251.000 30.0 152.222 5.430 -999.990 -999.990 1.522 ..P WKT 2010 12 14 15 34 55 31.3200 -97.3300 251.000 122.0 147.169 4.790 -999.990 -999.990 1.472 ..P WKT 2010 12 14 15 39 55 31.3200 -97.3300 251.000 457.0 132.584 5.180 -999.990 -999.990 1.326 ..P WKT 2010 12 14 15 49 55 31.3200 -97.3300 251.000 30.0 164.337 5.030 -999.990 -999.990 1.643 ..P WKT 2010 12 14 15 54 55 31.3200 -97.3300 251.000 122.0 153.624 5.080 -999.990 -999.990 1.536 ..P WKT 2010 12 14 15 59 55 31.3200 -97.3300 251.000 457.0 136.191 5.300 -999.990 -999.990 1.362 ..P WKT 2010 12 14 16 04 55 31.3200 -97.3300 251.000 30.0 149.379 5.260 -999.990 -999.990 1.494 ..P WKT 2010 12 14 16 09 55 31.3200 -97.3300 251.000 122.0 145.510 5.320 -999.990 -999.990 1.455 ..P WKT 2010 12 14 16 14 55 31.3200 -97.3300 251.000 457.0 138.011 5.550 -999.990 -999.990 1.380 ..P WKT 2010 12 14 16 24 55 31.3200 -97.3300 251.000 30.0 144.167 5.690 -999.990 -999.990 1.442 ..P WKT 2010 12 14 16 29 55 31.3200 -97.3300 251.000 122.0 140.486 4.600 -999.990 -999.990 1.405 ..P WKT 2010 12 14 16 34 55 31.3200 -97.3300 251.000 457.0 132.771 5.420 -999.990 -999.990 1.328 ..P WKT 2010 12 14 16 39 55 31.3200 -97.3300 251.000 30.0 147.779 4.870 -999.990 -999.990 1.478 ..P WKT 2010 12 14 16 44 55 31.3200 -97.3300 251.000 122.0 146.652 4.630 -999.990 -999.990 1.467 ..P WKT 2010 12 14 16 49 55 31.3200 -97.3300 251.000 457.0 142.836 4.240 -999.990 -999.990 1.428 ..P WKT 2010 12 14 17 04 55 31.3200 -97.3300 251.000 30.0 147.911 4.440 -999.990 -999.990 1.479 ..P WKT 2010 12 14 17 09 55 31.3200 -97.3300 251.000 122.0 147.245 4.390 -999.990 -999.990 1.472 ..P WKT 2010 12 14 17 14 55 31.3200 -97.3300 251.000 457.0 148.194 6.310 -999.990 -999.990 1.482 ..P WKT 2010 12 14 17 19 55 31.3200 -97.3300 251.000 30.0 153.048 5.510 -999.990 -999.990 1.530 ..P WKT 2010 12 14 17 24 55 31.3200 -97.3300 251.000 122.0 162.482 4.910 -999.990 -999.990 1.625 ..P WKT 2010 12 14 17 29 55 31.3200 -97.3300 251.000 457.0 147.678 5.070 -999.990 -999.990 1.477 ..P WKT 2010 12 14 17 39 55 31.3200 -97.3300 251.000 30.0 163.935 5.450 -999.990 -999.990 1.639 ..P WKT 2010 12 14 17 44 55 31.3200 -97.3300 251.000 122.0 169.950 6.600 -999.990 -999.990 1.700 ..P WKT 2010 12 14 17 49 55 31.3200 -97.3300 251.000 457.0 172.194 5.010 -999.990 -999.990 1.722 ..P WKT 2010 12 14 17 54 55 31.3200 -97.3300 251.000 30.0 168.777 6.110 -999.990 -999.990 1.688 ..P WKT 2010 12 14 17 59 55 31.3200 -97.3300 251.000 122.0 173.179 5.100 -999.990 -999.990 1.732 ..P WKT 2010 12 14 18 04 55 31.3200 -97.3300 251.000 457.0 165.447 6.040 -999.990 -999.990 1.654 ..P WKT 2010 12 14 18 14 55 31.3200 -97.3300 251.000 30.0 174.522 5.260 -999.990 -999.990 1.745 ..P WKT 2010 12 14 18 19 55 31.3200 -97.3300 251.000 122.0 175.419 5.350 -999.990 -999.990 1.754 ..P WKT 2010 12 14 18 24 55 31.3200 -97.3300 251.000 457.0 171.730 6.790 -999.990 -999.990 1.717 ..P WKT 2010 12 14 18 29 55 31.3200 -97.3300 251.000 30.0 166.152 4.920 -999.990 -999.990 1.662 ..P WKT 2010 12 14 18 34 55 31.3200 -97.3300 251.000 122.0 159.222 4.960 -999.990 -999.990 1.592 ..P WKT 2010 12 14 18 39 55 31.3200 -97.3300 251.000 457.0 169.026 4.380 -999.990 -999.990 1.690 ..P WKT 2010 12 14 18 49 55 31.3200 -97.3300 251.000 30.0 170.840 4.520 -999.990 -999.990 1.708 ..P WKT 2010 12 14 18 54 55 31.3200 -97.3300 251.000 122.0 166.896 5.520 -999.990 -999.990 1.669 ..P WKT 2010 12 14 18 59 55 31.3200 -97.3300 251.000 457.0 161.601 4.910 -999.990 -999.990 1.616 ..P WKT 2010 12 14 19 04 55 31.3200 -97.3300 251.000 30.0 163.598 5.360 -999.990 -999.990 1.636 ..P WKT 2010 12 14 19 09 55 31.3200 -97.3300 251.000 122.0 174.645 5.070 -999.990 -999.990 1.746 ..P WKT 2010 12 14 19 14 55 31.3200 -97.3300 251.000 457.0 162.999 5.810 -999.990 -999.990 1.630 ..P WKT 2010 12 14 19 24 55 31.3200 -97.3300 251.000 30.0 165.875 5.000 -999.990 -999.990 1.659 ..P WKT 2010 12 14 19 29 55 31.3200 -97.3300 251.000 122.0 167.565 5.860 -999.990 -999.990 1.676 ..P WKT 2010 12 14 19 34 55 31.3200 -97.3300 251.000 457.0 154.655 5.730 -999.990 -999.990 1.547 ..P WKT 2010 12 14 19 39 55 31.3200 -97.3300 251.000 30.0 152.423 5.140 -999.990 -999.990 1.524 ..P WKT 2010 12 14 19 44 55 31.3200 -97.3300 251.000 122.0 161.954 5.000 -999.990 -999.990 1.620 ..P WKT 2010 12 14 19 49 55 31.3200 -97.3300 251.000 457.0 151.202 4.550 -999.990 -999.990 1.512 ..P WKT 2010 12 14 19 59 55 31.3200 -97.3300 251.000 30.0 158.485 4.970 -999.990 -999.990 1.585 ..P WKT 2010 12 14 20 04 55 31.3200 -97.3300 251.000 122.0 155.014 4.960 -999.990 -999.990 1.550 ..P WKT 2010 12 14 20 09 55 31.3200 -97.3300 251.000 457.0 154.655 5.720 -999.990 -999.990 1.547 ..P WKT 2010 12 14 20 14 55 31.3200 -97.3300 251.000 30.0 163.094 5.020 -999.990 -999.990 1.631 ..P WKT 2010 12 14 20 19 55 31.3200 -97.3300 251.000 122.0 166.662 5.080 -999.990 -999.990 1.667 ..P WKT 2010 12 14 20 24 55 31.3200 -97.3300 251.000 457.0 167.930 5.140 -999.990 -999.990 1.679 ..P WKT 2010 12 14 20 34 55 31.3200 -97.3300 251.000 30.0 160.462 5.230 -999.990 -999.990 1.605 ..P WKT 2010 12 14 20 39 55 31.3200 -97.3300 251.000 122.0 159.039 4.740 -999.990 -999.990 1.590 ..P WKT 2010 12 14 20 44 55 31.3200 -97.3300 251.000 457.0 162.900 5.070 -999.990 -999.990 1.629 ..P WKT 2010 12 14 20 49 55 31.3200 -97.3300 251.000 30.0 161.070 4.720 -999.990 -999.990 1.611 ..P WKT 2010 12 14 20 54 55 31.3200 -97.3300 251.000 122.0 155.582 5.030 -999.990 -999.990 1.556 ..P WKT 2010 12 14 20 59 55 31.3200 -97.3300 251.000 457.0 156.597 4.900 -999.990 -999.990 1.566 ..P WKT 2010 12 14 21 09 55 31.3200 -97.3300 251.000 30.0 154.735 5.000 -999.990 -999.990 1.547 ..P WKT 2010 12 14 21 14 55 31.3200 -97.3300 251.000 122.0 151.721 4.900 -999.990 -999.990 1.517 ..P WKT 2010 12 14 21 19 55 31.3200 -97.3300 251.000 457.0 155.759 5.610 -999.990 -999.990 1.558 ..P WKT 2010 12 14 21 24 55 31.3200 -97.3300 251.000 30.0 145.962 5.060 -999.990 -999.990 1.460 ..P WKT 2010 12 14 21 29 55 31.3200 -97.3300 251.000 122.0 150.543 4.840 -999.990 -999.990 1.505 ..P WKT 2010 12 14 21 34 55 31.3200 -97.3300 251.000 457.0 145.627 4.700 -999.990 -999.990 1.456 ..P WKT 2010 12 14 21 44 55 31.3200 -97.3300 251.000 30.0 150.411 5.820 -999.990 -999.990 1.504 ..P WKT 2010 12 14 21 49 55 31.3200 -97.3300 251.000 122.0 150.884 4.770 -999.990 -999.990 1.509 ..P WKT 2010 12 14 21 54 55 31.3200 -97.3300 251.000 457.0 142.124 4.750 -999.990 -999.990 1.421 ..P WKT 2010 12 14 21 59 55 31.3200 -97.3300 251.000 30.0 147.757 4.770 -999.990 -999.990 1.478 ..P WKT 2010 12 14 22 04 55 31.3200 -97.3300 251.000 122.0 144.426 5.330 -999.990 -999.990 1.444 ..P WKT 2010 12 14 22 09 55 31.3200 -97.3300 251.000 457.0 135.390 5.220 -999.990 -999.990 1.354 ..P WKT 2010 12 14 22 19 55 31.3200 -97.3300 251.000 30.0 135.906 5.490 -999.990 -999.990 1.359 ..P WKT 2010 12 14 22 24 55 31.3200 -97.3300 251.000 122.0 134.047 5.400 -999.990 -999.990 1.340 ..P WKT 2010 12 14 22 29 55 31.3200 -97.3300 251.000 457.0 132.732 5.170 -999.990 -999.990 1.327 ..P WKT 2010 12 14 22 34 55 31.3200 -97.3300 251.000 30.0 141.476 5.100 -999.990 -999.990 1.415 ..P WKT 2010 12 14 22 39 55 31.3200 -97.3300 251.000 122.0 136.354 5.390 -999.990 -999.990 1.364 ..P WKT 2010 12 14 22 44 55 31.3200 -97.3300 251.000 457.0 135.311 5.300 -999.990 -999.990 1.353 ..P WKT 2010 12 14 22 54 55 31.3200 -97.3300 251.000 30.0 139.344 5.170 -999.990 -999.990 1.393 ..P WKT 2010 12 14 22 59 55 31.3200 -97.3300 251.000 122.0 139.525 5.110 -999.990 -999.990 1.395 ..P WKT 2010 12 14 23 04 55 31.3200 -97.3300 251.000 457.0 132.494 5.700 -999.990 -999.990 1.325 ..P WKT 2010 12 14 23 09 55 31.3200 -97.3300 251.000 30.0 138.390 5.800 -999.990 -999.990 1.384 ..P WKT 2010 12 14 23 14 55 31.3200 -97.3300 251.000 122.0 137.209 5.590 -999.990 -999.990 1.372 ..P WKT 2010 12 14 23 19 55 31.3200 -97.3300 251.000 457.0 142.291 5.240 -999.990 -999.990 1.423 ..P WKT 2010 12 14 23 29 55 31.3200 -97.3300 251.000 30.0 140.606 5.450 -999.990 -999.990 1.406 ..P WKT 2010 12 14 23 34 55 31.3200 -97.3300 251.000 122.0 150.589 5.540 -999.990 -999.990 1.506 ..P WKT 2010 12 14 23 39 55 31.3200 -97.3300 251.000 457.0 141.504 5.770 -999.990 -999.990 1.415 ..P WKT 2010 12 14 23 44 55 31.3200 -97.3300 251.000 30.0 143.179 6.070 -999.990 -999.990 1.432 ..P WKT 2010 12 14 23 49 55 31.3200 -97.3300 251.000 122.0 143.492 5.440 -999.990 -999.990 1.435 ..P WKT 2010 12 15 00 09 55 31.3200 -97.3300 251.000 457.0 141.920 5.010 -999.990 -999.990 1.419 ..P WKT 2010 12 15 00 10 25 31.3200 -97.3300 251.000 457.0 139.912 6.440 -999.990 -999.990 1.399 ..P WKT 2010 12 15 00 10 55 31.3200 -97.3300 251.000 457.0 136.950 5.720 -999.990 -999.990 1.369 ..P WKT 2010 12 15 00 11 25 31.3200 -97.3300 251.000 457.0 135.486 5.360 -999.990 -999.990 1.355 ..P WKT 2010 12 15 00 11 55 31.3200 -97.3300 251.000 457.0 139.609 5.110 -999.990 -999.990 1.396 ..P WKT 2010 12 15 00 12 25 31.3200 -97.3300 251.000 457.0 132.287 5.960 -999.990 -999.990 1.323 ..P WKT 2010 12 15 00 12 55 31.3200 -97.3300 251.000 457.0 133.822 5.310 -999.990 -999.990 1.338 ..P WKT 2010 12 15 00 13 25 31.3200 -97.3300 251.000 457.0 135.493 5.450 -999.990 -999.990 1.355 ..P WKT 2010 12 15 00 13 55 31.3200 -97.3300 251.000 457.0 136.209 5.080 -999.990 -999.990 1.362 ..P WKT 2010 12 15 00 14 25 31.3200 -97.3300 251.000 457.0 136.654 5.190 -999.990 -999.990 1.367 ..P WKT 2010 12 15 00 14 55 31.3200 -97.3300 251.000 457.0 136.553 5.950 -999.990 -999.990 1.366 ..P WKT 2010 12 15 00 19 55 31.3200 -97.3300 251.000 30.0 144.811 5.450 -999.990 -999.990 1.448 ..P WKT 2010 12 15 00 24 55 31.3200 -97.3300 251.000 122.0 144.757 5.750 -999.990 -999.990 1.448 ..P WKT 2010 12 15 00 29 55 31.3200 -97.3300 251.000 457.0 140.345 5.360 -999.990 -999.990 1.403 ..P WKT 2010 12 15 00 34 55 31.3200 -97.3300 251.000 30.0 143.152 5.620 -999.990 -999.990 1.432 ..P WKT 2010 12 15 00 39 55 31.3200 -97.3300 251.000 122.0 150.862 5.330 -999.990 -999.990 1.509 ..P WKT 2010 12 15 00 44 55 31.3200 -97.3300 251.000 457.0 143.317 5.060 -999.990 -999.990 1.433 ..P WKT 2010 12 15 00 54 55 31.3200 -97.3300 251.000 30.0 146.621 5.690 -999.990 -999.990 1.466 ..P WKT 2010 12 15 00 59 55 31.3200 -97.3300 251.000 122.0 147.390 5.560 -999.990 -999.990 1.474 ..P WKT 2010 12 15 01 04 55 31.3200 -97.3300 251.000 457.0 142.578 5.890 -999.990 -999.990 1.426 ..P WKT 2010 12 15 01 09 55 31.3200 -97.3300 251.000 30.0 150.018 6.300 -999.990 -999.990 1.500 ..P WKT 2010 12 15 01 14 55 31.3200 -97.3300 251.000 122.0 149.018 6.760 -999.990 -999.990 1.490 ..P WKT 2010 12 15 01 19 55 31.3200 -97.3300 251.000 457.0 140.668 7.150 -999.990 -999.990 1.407 ..P WKT 2010 12 15 01 29 55 31.3200 -97.3300 251.000 30.0 154.979 7.450 -999.990 -999.990 1.550 ..P WKT 2010 12 15 01 34 55 31.3200 -97.3300 251.000 122.0 147.156 6.920 -999.990 -999.990 1.472 ..P WKT 2010 12 15 01 39 55 31.3200 -97.3300 251.000 457.0 145.865 6.080 -999.990 -999.990 1.459 ..P WKT 2010 12 15 01 44 55 31.3200 -97.3300 251.000 30.0 147.839 6.150 -999.990 -999.990 1.478 ..P WKT 2010 12 15 01 49 55 31.3200 -97.3300 251.000 122.0 149.813 6.020 -999.990 -999.990 1.498 ..P WKT 2010 12 15 01 54 55 31.3200 -97.3300 251.000 457.0 135.464 4.910 -999.990 -999.990 1.355 ..P WKT 2010 12 15 02 04 55 31.3200 -97.3300 251.000 30.0 142.637 4.910 -999.990 -999.990 1.426 ..P WKT 2010 12 15 02 09 55 31.3200 -97.3300 251.000 122.0 150.827 5.450 -999.990 -999.990 1.508 ..P WKT 2010 12 15 02 14 55 31.3200 -97.3300 251.000 457.0 132.365 5.740 -999.990 -999.990 1.324 ..P WKT 2010 12 15 02 19 55 31.3200 -97.3300 251.000 30.0 155.237 5.050 -999.990 -999.990 1.552 ..P WKT 2010 12 15 02 24 55 31.3200 -97.3300 251.000 122.0 149.014 4.990 -999.990 -999.990 1.490 ..P WKT 2010 12 15 02 29 55 31.3200 -97.3300 251.000 457.0 133.820 5.810 -999.990 -999.990 1.338 ..P WKT 2010 12 15 02 39 55 31.3200 -97.3300 251.000 30.0 139.358 4.940 -999.990 -999.990 1.394 ..P WKT 2010 12 15 02 44 55 31.3200 -97.3300 251.000 122.0 138.885 5.160 -999.990 -999.990 1.389 ..P WKT 2010 12 15 02 49 55 31.3200 -97.3300 251.000 457.0 133.655 4.970 -999.990 -999.990 1.337 ..P WKT 2010 12 15 02 54 55 31.3200 -97.3300 251.000 30.0 142.965 5.910 -999.990 -999.990 1.430 ..P WKT 2010 12 15 02 59 55 31.3200 -97.3300 251.000 122.0 135.291 5.150 -999.990 -999.990 1.353 ..P WKT 2010 12 15 03 04 55 31.3200 -97.3300 251.000 457.0 130.878 4.930 -999.990 -999.990 1.309 ..P WKT 2010 12 15 03 14 55 31.3200 -97.3300 251.000 30.0 135.424 6.090 -999.990 -999.990 1.354 ..P WKT 2010 12 15 03 19 55 31.3200 -97.3300 251.000 122.0 132.836 4.940 -999.990 -999.990 1.328 ..P WKT 2010 12 15 03 24 55 31.3200 -97.3300 251.000 457.0 127.533 4.850 -999.990 -999.990 1.275 ..P WKT 2010 12 15 03 29 55 31.3200 -97.3300 251.000 30.0 134.180 5.050 -999.990 -999.990 1.342 ..P WKT 2010 12 15 03 34 55 31.3200 -97.3300 251.000 122.0 133.494 5.220 -999.990 -999.990 1.335 ..P WKT 2010 12 15 03 39 55 31.3200 -97.3300 251.000 457.0 137.152 4.970 -999.990 -999.990 1.372 ..P WKT 2010 12 15 03 49 55 31.3200 -97.3300 251.000 30.0 141.558 5.240 -999.990 -999.990 1.416 ..P WKT 2010 12 15 03 54 55 31.3200 -97.3300 251.000 122.0 139.592 5.050 -999.990 -999.990 1.396 ..P WKT 2010 12 15 03 59 55 31.3200 -97.3300 251.000 457.0 135.726 5.010 -999.990 -999.990 1.357 ..P WKT 2010 12 15 04 04 55 31.3200 -97.3300 251.000 30.0 137.696 4.970 -999.990 -999.990 1.377 ..P WKT 2010 12 15 04 09 55 31.3200 -97.3300 251.000 122.0 138.851 5.270 -999.990 -999.990 1.389 ..P WKT 2010 12 15 04 14 55 31.3200 -97.3300 251.000 457.0 130.238 5.510 -999.990 -999.990 1.302 ..P WKT 2010 12 15 04 24 55 31.3200 -97.3300 251.000 30.0 136.445 5.310 -999.990 -999.990 1.364 ..P WKT 2010 12 15 04 29 55 31.3200 -97.3300 251.000 122.0 136.205 5.260 -999.990 -999.990 1.362 ..P WKT 2010 12 15 04 34 55 31.3200 -97.3300 251.000 457.0 138.677 5.070 -999.990 -999.990 1.387 ..P WKT 2010 12 15 04 39 55 31.3200 -97.3300 251.000 30.0 140.200 5.890 -999.990 -999.990 1.402 ..P WKT 2010 12 15 04 44 55 31.3200 -97.3300 251.000 122.0 143.350 4.890 -999.990 -999.990 1.433 ..P WKT 2010 12 15 04 49 55 31.3200 -97.3300 251.000 457.0 138.364 4.870 -999.990 -999.990 1.384 ..P WKT 2010 12 15 05 04 55 31.3200 -97.3300 251.000 30.0 133.974 4.790 -999.990 -999.990 1.340 ..P WKT 2010 12 15 05 09 55 31.3200 -97.3300 251.000 122.0 138.339 4.700 -999.990 -999.990 1.383 ..P WKT 2010 12 15 05 14 55 31.3200 -97.3300 251.000 457.0 138.907 5.090 -999.990 -999.990 1.389 ..P WKT 2010 12 15 05 19 55 31.3200 -97.3300 251.000 30.0 135.410 5.240 -999.990 -999.990 1.354 ..P WKT 2010 12 15 05 24 55 31.3200 -97.3300 251.000 122.0 134.352 5.520 -999.990 -999.990 1.344 ..P WKT 2010 12 15 05 29 55 31.3200 -97.3300 251.000 457.0 141.966 4.610 -999.990 -999.990 1.420 ..P WKT 2010 12 15 05 39 55 31.3200 -97.3300 251.000 30.0 131.998 5.510 -999.990 -999.990 1.320 ..P WKT 2010 12 15 05 44 55 31.3200 -97.3300 251.000 122.0 138.532 4.860 -999.990 -999.990 1.385 ..P WKT 2010 12 15 05 49 55 31.3200 -97.3300 251.000 457.0 150.212 6.340 -999.990 -999.990 1.502 ..P WKT 2010 12 15 05 54 55 31.3200 -97.3300 251.000 30.0 136.156 6.920 -999.990 -999.990 1.362 ..P WKT 2010 12 15 05 59 55 31.3200 -97.3300 251.000 122.0 142.146 6.880 -999.990 -999.990 1.421 ..P WKT 2010 12 15 06 04 55 31.3200 -97.3300 251.000 457.0 150.843 5.200 -999.990 -999.990 1.508 ..P WKT 2010 12 15 06 14 55 31.3200 -97.3300 251.000 30.0 140.904 5.400 -999.990 -999.990 1.409 ..P WKT 2010 12 15 06 19 55 31.3200 -97.3300 251.000 122.0 139.059 6.230 -999.990 -999.990 1.391 ..P WKT 2010 12 15 06 24 55 31.3200 -97.3300 251.000 457.0 135.049 7.360 -999.990 -999.990 1.350 ..P WKT 2010 12 15 06 29 55 31.3200 -97.3300 251.000 30.0 133.475 7.180 -999.990 -999.990 1.335 ..P WKT 2010 12 15 06 34 55 31.3200 -97.3300 251.000 122.0 137.044 6.830 -999.990 -999.990 1.370 ..P WKT 2010 12 15 06 39 55 31.3200 -97.3300 251.000 457.0 141.019 5.360 -999.990 -999.990 1.410 ..P WKT 2010 12 15 06 49 55 31.3200 -97.3300 251.000 30.0 124.265 5.220 -999.990 -999.990 1.243 ..P WKT 2010 12 15 06 54 55 31.3200 -97.3300 251.000 122.0 133.981 6.580 -999.990 -999.990 1.340 ..P WKT 2010 12 15 06 59 55 31.3200 -97.3300 251.000 457.0 141.935 7.410 -999.990 -999.990 1.419 ..P WKT 2010 12 15 07 04 55 31.3200 -97.3300 251.000 30.0 133.116 6.450 -999.990 -999.990 1.331 ..P WKT 2010 12 15 07 09 55 31.3200 -97.3300 251.000 122.0 129.032 6.170 -999.990 -999.990 1.290 ..P WKT 2010 12 15 07 14 55 31.3200 -97.3300 251.000 457.0 144.288 5.460 -999.990 -999.990 1.443 ..P WKT 2010 12 15 07 24 55 31.3200 -97.3300 251.000 30.0 135.617 5.000 -999.990 -999.990 1.356 ..P WKT 2010 12 15 07 29 55 31.3200 -97.3300 251.000 122.0 136.035 5.830 -999.990 -999.990 1.360 ..P WKT 2010 12 15 07 34 55 31.3200 -97.3300 251.000 457.0 138.751 6.960 -999.990 -999.990 1.388 ..P WKT 2010 12 15 07 39 55 31.3200 -97.3300 251.000 30.0 128.759 6.440 -999.990 -999.990 1.288 ..P WKT 2010 12 15 07 44 55 31.3200 -97.3300 251.000 122.0 134.584 5.670 -999.990 -999.990 1.346 ..P WKT 2010 12 15 07 49 55 31.3200 -97.3300 251.000 457.0 136.218 6.080 -999.990 -999.990 1.362 ..P WKT 2010 12 15 07 59 55 31.3200 -97.3300 251.000 30.0 130.953 6.220 -999.990 -999.990 1.310 ..P WKT 2010 12 15 08 04 55 31.3200 -97.3300 251.000 122.0 136.350 6.290 -999.990 -999.990 1.363 ..P WKT 2010 12 15 08 09 55 31.3200 -97.3300 251.000 457.0 132.965 6.270 -999.990 -999.990 1.330 ..P WKT 2010 12 15 08 14 55 31.3200 -97.3300 251.000 30.0 129.446 5.360 -999.990 -999.990 1.294 ..P WKT 2010 12 15 08 19 55 31.3200 -97.3300 251.000 122.0 127.548 5.350 -999.990 -999.990 1.275 ..P WKT 2010 12 15 08 24 55 31.3200 -97.3300 251.000 457.0 134.294 5.300 -999.990 -999.990 1.343 ..P WKT 2010 12 15 08 34 55 31.3200 -97.3300 251.000 30.0 141.727 5.160 -999.990 -999.990 1.417 ..P WKT 2010 12 15 08 39 55 31.3200 -97.3300 251.000 122.0 138.362 6.060 -999.990 -999.990 1.384 ..P WKT 2010 12 15 08 44 55 31.3200 -97.3300 251.000 457.0 143.775 4.980 -999.990 -999.990 1.438 ..P WKT 2010 12 15 08 49 55 31.3200 -97.3300 251.000 30.0 134.065 5.130 -999.990 -999.990 1.341 ..P WKT 2010 12 15 08 54 55 31.3200 -97.3300 251.000 122.0 138.938 5.260 -999.990 -999.990 1.389 ..P WKT 2010 12 15 08 59 55 31.3200 -97.3300 251.000 457.0 143.809 4.930 -999.990 -999.990 1.438 ..P WKT 2010 12 15 09 09 55 31.3200 -97.3300 251.000 30.0 137.334 4.660 -999.990 -999.990 1.373 ..P WKT 2010 12 15 09 14 55 31.3200 -97.3300 251.000 122.0 140.295 5.260 -999.990 -999.990 1.403 ..P WKT 2010 12 15 09 19 55 31.3200 -97.3300 251.000 457.0 140.827 5.490 -999.990 -999.990 1.408 ..P WKT 2010 12 15 09 24 55 31.3200 -97.3300 251.000 30.0 140.010 4.930 -999.990 -999.990 1.400 ..P WKT 2010 12 15 09 29 55 31.3200 -97.3300 251.000 122.0 142.431 4.410 -999.990 -999.990 1.424 ..P WKT 2010 12 15 09 34 55 31.3200 -97.3300 251.000 457.0 137.027 4.300 -999.990 -999.990 1.370 ..P WKT 2010 12 15 09 44 55 31.3200 -97.3300 251.000 30.0 137.744 5.390 -999.990 -999.990 1.377 ..P WKT 2010 12 15 09 49 55 31.3200 -97.3300 251.000 122.0 141.975 4.400 -999.990 -999.990 1.420 ..P WKT 2010 12 15 09 54 55 31.3200 -97.3300 251.000 457.0 148.364 5.010 -999.990 -999.990 1.484 ..P WKT 2010 12 15 09 59 55 31.3200 -97.3300 251.000 30.0 141.805 4.800 -999.990 -999.990 1.418 ..P WKT 2010 12 15 10 04 55 31.3200 -97.3300 251.000 122.0 144.148 4.960 -999.990 -999.990 1.441 ..P WKT 2010 12 15 10 09 55 31.3200 -97.3300 251.000 457.0 139.209 5.140 -999.990 -999.990 1.392 ..P WKT 2010 12 15 10 19 55 31.3200 -97.3300 251.000 30.0 136.305 6.800 -999.990 -999.990 1.363 ..P WKT 2010 12 15 10 24 55 31.3200 -97.3300 251.000 122.0 137.530 6.570 -999.990 -999.990 1.375 ..P WKT 2010 12 15 10 29 55 31.3200 -97.3300 251.000 457.0 143.068 4.870 -999.990 -999.990 1.431 ..P WKT 2010 12 15 10 34 55 31.3200 -97.3300 251.000 30.0 135.127 5.080 -999.990 -999.990 1.351 ..P WKT 2010 12 15 10 39 55 31.3200 -97.3300 251.000 122.0 138.239 4.820 -999.990 -999.990 1.382 ..P WKT 2010 12 15 10 44 55 31.3200 -97.3300 251.000 457.0 139.329 5.230 -999.990 -999.990 1.393 ..P WKT 2010 12 15 10 54 55 31.3200 -97.3300 251.000 30.0 135.156 4.640 -999.990 -999.990 1.352 ..P WKT 2010 12 15 10 59 55 31.3200 -97.3300 251.000 122.0 135.284 5.010 -999.990 -999.990 1.353 ..P WKT 2010 12 15 11 04 55 31.3200 -97.3300 251.000 457.0 137.297 4.830 -999.990 -999.990 1.373 ..P WKT 2010 12 15 11 09 55 31.3200 -97.3300 251.000 30.0 135.808 5.020 -999.990 -999.990 1.358 ..P WKT 2010 12 15 11 14 55 31.3200 -97.3300 251.000 122.0 129.875 4.660 -999.990 -999.990 1.299 ..P WKT 2010 12 15 11 19 55 31.3200 -97.3300 251.000 457.0 141.449 4.400 -999.990 -999.990 1.414 ..P WKT 2010 12 15 11 29 55 31.3200 -97.3300 251.000 30.0 137.562 4.520 -999.990 -999.990 1.376 ..P WKT 2010 12 15 11 34 55 31.3200 -97.3300 251.000 122.0 135.166 4.570 -999.990 -999.990 1.352 ..P WKT 2010 12 15 11 39 55 31.3200 -97.3300 251.000 457.0 153.364 4.720 -999.990 -999.990 1.534 ..P WKT 2010 12 15 11 44 55 31.3200 -97.3300 251.000 30.0 139.526 5.260 -999.990 -999.990 1.395 ..P WKT 2010 12 15 11 49 55 31.3200 -97.3300 251.000 122.0 135.110 4.820 -999.990 -999.990 1.351 ..P WKT 2010 12 15 12 09 55 31.3200 -97.3300 251.000 457.0 148.895 5.290 -999.990 -999.990 1.489 ..P WKT 2010 12 15 12 10 25 31.3200 -97.3300 251.000 457.0 147.009 5.760 -999.990 -999.990 1.470 ..P WKT 2010 12 15 12 10 55 31.3200 -97.3300 251.000 457.0 151.177 5.390 -999.990 -999.990 1.512 ..P WKT 2010 12 15 12 11 25 31.3200 -97.3300 251.000 457.0 145.928 5.420 -999.990 -999.990 1.459 ..P WKT 2010 12 15 12 11 55 31.3200 -97.3300 251.000 457.0 149.558 6.190 -999.990 -999.990 1.496 ..P WKT 2010 12 15 12 12 25 31.3200 -97.3300 251.000 457.0 154.534 5.370 -999.990 -999.990 1.545 ..P WKT 2010 12 15 12 12 55 31.3200 -97.3300 251.000 457.0 151.975 5.550 -999.990 -999.990 1.520 ..P WKT 2010 12 15 12 13 25 31.3200 -97.3300 251.000 457.0 147.400 6.120 -999.990 -999.990 1.474 ..P WKT 2010 12 15 12 13 55 31.3200 -97.3300 251.000 457.0 146.994 5.560 -999.990 -999.990 1.470 ..P WKT 2010 12 15 12 14 25 31.3200 -97.3300 251.000 457.0 150.624 5.470 -999.990 -999.990 1.506 ..P WKT 2010 12 15 12 14 55 31.3200 -97.3300 251.000 457.0 152.370 5.250 -999.990 -999.990 1.524 ..P WKT 2010 12 15 12 19 55 31.3200 -97.3300 251.000 30.0 135.534 5.020 -999.990 -999.990 1.355 ..P WKT 2010 12 15 12 24 55 31.3200 -97.3300 251.000 122.0 141.431 6.000 -999.990 -999.990 1.414 ..P WKT 2010 12 15 12 29 55 31.3200 -97.3300 251.000 457.0 155.531 5.160 -999.990 -999.990 1.555 ..P WKT 2010 12 15 12 34 55 31.3200 -97.3300 251.000 30.0 142.062 5.150 -999.990 -999.990 1.421 ..P WKT 2010 12 15 12 39 55 31.3200 -97.3300 251.000 122.0 144.057 4.850 -999.990 -999.990 1.441 ..P WKT 2010 12 15 12 44 55 31.3200 -97.3300 251.000 457.0 158.019 4.650 -999.990 -999.990 1.580 ..P WKT 2010 12 15 12 54 55 31.3200 -97.3300 251.000 30.0 143.470 5.080 -999.990 -999.990 1.435 ..P WKT 2010 12 15 12 59 55 31.3200 -97.3300 251.000 122.0 145.077 4.490 -999.990 -999.990 1.451 ..P WKT 2010 12 15 13 04 55 31.3200 -97.3300 251.000 457.0 152.328 4.780 -999.990 -999.990 1.523 ..P WKT 2010 12 15 13 09 55 31.3200 -97.3300 251.000 30.0 146.676 4.880 -999.990 -999.990 1.467 ..P WKT 2010 12 15 13 14 55 31.3200 -97.3300 251.000 122.0 147.745 4.680 -999.990 -999.990 1.477 ..P WKT 2010 12 15 13 19 55 31.3200 -97.3300 251.000 457.0 153.919 4.370 -999.990 -999.990 1.539 ..P WKT 2010 12 15 13 29 55 31.3200 -97.3300 251.000 30.0 146.689 4.560 -999.990 -999.990 1.467 ..P WKT 2010 12 15 13 34 55 31.3200 -97.3300 251.000 122.0 144.034 5.490 -999.990 -999.990 1.440 ..P WKT 2010 12 15 13 39 55 31.3200 -97.3300 251.000 457.0 150.513 4.950 -999.990 -999.990 1.505 ..P WKT 2010 12 15 13 44 55 31.3200 -97.3300 251.000 30.0 145.172 5.180 -999.990 -999.990 1.452 ..P WKT 2010 12 15 13 49 55 31.3200 -97.3300 251.000 122.0 151.918 6.490 -999.990 -999.990 1.519 ..P WKT 2010 12 15 13 54 55 31.3200 -97.3300 251.000 457.0 150.607 5.020 -999.990 -999.990 1.506 ..P WKT 2010 12 15 14 04 55 31.3200 -97.3300 251.000 30.0 148.445 5.050 -999.990 -999.990 1.484 ..P WKT 2010 12 15 14 09 55 31.3200 -97.3300 251.000 122.0 150.010 4.740 -999.990 -999.990 1.500 ..P WKT 2010 12 15 14 14 55 31.3200 -97.3300 251.000 457.0 147.817 4.870 -999.990 -999.990 1.478 ..P WKT 2010 12 15 14 19 55 31.3200 -97.3300 251.000 30.0 154.752 5.170 -999.990 -999.990 1.548 ..P WKT 2010 12 15 14 24 55 31.3200 -97.3300 251.000 122.0 150.143 4.670 -999.990 -999.990 1.501 ..P WKT 2010 12 15 14 29 55 31.3200 -97.3300 251.000 457.0 148.487 4.690 -999.990 -999.990 1.485 ..P WKT 2010 12 15 14 39 55 31.3200 -97.3300 251.000 30.0 161.278 5.420 -999.990 -999.990 1.613 ..P WKT 2010 12 15 14 44 55 31.3200 -97.3300 251.000 122.0 152.377 4.850 -999.990 -999.990 1.524 ..P WKT 2010 12 15 14 49 55 31.3200 -97.3300 251.000 457.0 150.587 4.260 -999.990 -999.990 1.506 ..P WKT 2010 12 15 14 54 55 31.3200 -97.3300 251.000 30.0 154.164 4.360 -999.990 -999.990 1.542 ..P WKT 2010 12 15 14 59 55 31.3200 -97.3300 251.000 122.0 161.629 5.220 -999.990 -999.990 1.616 ..P WKT 2010 12 15 15 04 55 31.3200 -97.3300 251.000 457.0 156.889 4.980 -999.990 -999.990 1.569 ..P WKT 2010 12 15 15 14 55 31.3200 -97.3300 251.000 30.0 158.387 5.130 -999.990 -999.990 1.584 ..P WKT 2010 12 15 15 19 55 31.3200 -97.3300 251.000 122.0 158.188 5.040 -999.990 -999.990 1.582 ..P WKT 2010 12 15 15 24 55 31.3200 -97.3300 251.000 457.0 151.554 4.590 -999.990 -999.990 1.516 ..P WKT 2010 12 15 15 29 55 31.3200 -97.3300 251.000 30.0 156.181 5.030 -999.990 -999.990 1.562 ..P WKT 2010 12 15 15 34 55 31.3200 -97.3300 251.000 122.0 158.260 6.970 -999.990 -999.990 1.583 ..P WKT 2010 12 15 15 39 55 31.3200 -97.3300 251.000 457.0 154.175 4.770 -999.990 -999.990 1.542 ..P WKT 2010 12 15 15 49 55 31.3200 -97.3300 251.000 30.0 161.530 4.830 -999.990 -999.990 1.615 ..P WKT 2010 12 15 15 54 55 31.3200 -97.3300 251.000 122.0 165.733 4.790 -999.990 -999.990 1.657 ..P WKT 2010 12 15 15 59 55 31.3200 -97.3300 251.000 457.0 149.972 5.810 -999.990 -999.990 1.500 ..P WKT 2010 12 15 16 04 55 31.3200 -97.3300 251.000 30.0 163.420 5.240 -999.990 -999.990 1.634 ..P WKT 2010 12 15 16 09 55 31.3200 -97.3300 251.000 122.0 157.977 4.560 -999.990 -999.990 1.580 ..P WKT 2010 12 15 16 14 55 31.3200 -97.3300 251.000 457.0 156.151 4.940 -999.990 -999.990 1.562 ..P WKT 2010 12 15 16 24 55 31.3200 -97.3300 251.000 30.0 157.322 4.840 -999.990 -999.990 1.573 ..P WKT 2010 12 15 16 29 55 31.3200 -97.3300 251.000 122.0 152.953 4.040 -999.990 -999.990 1.530 ..P WKT 2010 12 15 16 34 55 31.3200 -97.3300 251.000 457.0 157.690 4.100 -999.990 -999.990 1.577 ..P WKT 2010 12 15 16 39 55 31.3200 -97.3300 251.000 30.0 158.409 4.150 -999.990 -999.990 1.584 ..P WKT 2010 12 15 16 44 55 31.3200 -97.3300 251.000 122.0 159.664 4.640 -999.990 -999.990 1.597 ..P WKT 2010 12 15 16 49 55 31.3200 -97.3300 251.000 457.0 150.744 4.320 -999.990 -999.990 1.507 ..P WKT 2010 12 15 17 04 55 31.3200 -97.3300 251.000 30.0 148.506 3.980 -999.990 -999.990 1.485 ..P WKT 2010 12 15 17 09 55 31.3200 -97.3300 251.000 122.0 152.513 4.710 -999.990 -999.990 1.525 ..P WKT 2010 12 15 17 14 55 31.3200 -97.3300 251.000 457.0 151.168 6.280 -999.990 -999.990 1.512 ..P WKT 2010 12 15 17 19 55 31.3200 -97.3300 251.000 30.0 147.950 5.180 -999.990 -999.990 1.479 ..P WKT 2010 12 15 17 24 55 31.3200 -97.3300 251.000 122.0 152.224 4.960 -999.990 -999.990 1.522 ..P WKT 2010 12 15 17 29 55 31.3200 -97.3300 251.000 457.0 143.656 4.280 -999.990 -999.990 1.437 ..P WKT 2010 12 15 17 39 55 31.3200 -97.3300 251.000 30.0 149.490 4.450 -999.990 -999.990 1.495 ..P WKT 2010 12 15 17 44 55 31.3200 -97.3300 251.000 122.0 157.201 5.000 -999.990 -999.990 1.572 ..P WKT 2010 12 15 17 49 55 31.3200 -97.3300 251.000 457.0 149.132 5.070 -999.990 -999.990 1.491 ..P WKT 2010 12 15 17 54 55 31.3200 -97.3300 251.000 30.0 154.168 5.710 -999.990 -999.990 1.542 ..P WKT 2010 12 15 17 59 55 31.3200 -97.3300 251.000 122.0 156.796 5.360 -999.990 -999.990 1.568 ..P WKT 2010 12 15 18 04 55 31.3200 -97.3300 251.000 457.0 148.997 4.230 -999.990 -999.990 1.490 ..P WKT 2010 12 15 18 14 55 31.3200 -97.3300 251.000 30.0 157.690 5.120 -999.990 -999.990 1.577 ..P WKT 2010 12 15 18 19 55 31.3200 -97.3300 251.000 122.0 157.072 5.220 -999.990 -999.990 1.571 ..P WKT 2010 12 15 18 24 55 31.3200 -97.3300 251.000 457.0 157.388 5.860 -999.990 -999.990 1.574 ..P WKT 2010 12 15 18 29 55 31.3200 -97.3300 251.000 30.0 151.425 6.480 -999.990 -999.990 1.514 ..P WKT 2010 12 15 18 34 55 31.3200 -97.3300 251.000 122.0 159.625 4.490 -999.990 -999.990 1.596 ..P WKT 2010 12 15 18 39 55 31.3200 -97.3300 251.000 457.0 156.870 5.050 -999.990 -999.990 1.569 ..P WKT 2010 12 15 18 49 55 31.3200 -97.3300 251.000 30.0 152.580 4.750 -999.990 -999.990 1.526 ..P WKT 2010 12 15 18 54 55 31.3200 -97.3300 251.000 122.0 157.190 4.650 -999.990 -999.990 1.572 ..P WKT 2010 12 15 18 59 55 31.3200 -97.3300 251.000 457.0 146.441 4.690 -999.990 -999.990 1.464 ..P WKT 2010 12 15 19 04 55 31.3200 -97.3300 251.000 30.0 151.852 4.980 -999.990 -999.990 1.519 ..P WKT 2010 12 15 19 09 55 31.3200 -97.3300 251.000 122.0 153.390 4.840 -999.990 -999.990 1.534 ..P WKT 2010 12 15 19 14 55 31.3200 -97.3300 251.000 457.0 151.457 5.080 -999.990 -999.990 1.515 ..P WKT 2010 12 15 19 24 55 31.3200 -97.3300 251.000 30.0 155.696 5.070 -999.990 -999.990 1.557 ..P WKT 2010 12 15 19 29 55 31.3200 -97.3300 251.000 122.0 159.464 5.130 -999.990 -999.990 1.595 ..P WKT 2010 12 15 19 34 55 31.3200 -97.3300 251.000 457.0 162.831 4.640 -999.990 -999.990 1.628 ..P WKT 2010 12 15 19 39 55 31.3200 -97.3300 251.000 30.0 158.857 4.380 -999.990 -999.990 1.589 ..P WKT 2010 12 15 19 44 55 31.3200 -97.3300 251.000 122.0 158.220 5.130 -999.990 -999.990 1.582 ..P WKT 2010 12 15 19 49 55 31.3200 -97.3300 251.000 457.0 157.717 3.830 -999.990 -999.990 1.577 ..P WKT 2010 12 15 19 59 55 31.3200 -97.3300 251.000 30.0 159.703 3.880 -999.990 -999.990 1.597 ..P WKT 2010 12 15 20 04 55 31.3200 -97.3300 251.000 122.0 159.390 3.870 -999.990 -999.990 1.594 ..P WKT 2010 12 15 20 09 55 31.3200 -97.3300 251.000 457.0 153.475 3.930 -999.990 -999.990 1.535 ..P WKT 2010 12 15 20 14 55 31.3200 -97.3300 251.000 30.0 161.433 4.640 -999.990 -999.990 1.614 ..P WKT 2010 12 15 20 19 55 31.3200 -97.3300 251.000 122.0 164.321 3.990 -999.990 -999.990 1.643 ..P WKT 2010 12 15 20 24 55 31.3200 -97.3300 251.000 457.0 164.941 3.760 -999.990 -999.990 1.649 ..P WKT 2010 12 15 20 34 55 31.3200 -97.3300 251.000 30.0 175.076 3.740 -999.990 -999.990 1.751 ..P WKT 2010 12 15 20 39 55 31.3200 -97.3300 251.000 122.0 173.924 4.080 -999.990 -999.990 1.739 ..P WKT 2010 12 15 20 44 55 31.3200 -97.3300 251.000 457.0 170.906 5.070 -999.990 -999.990 1.709 ..P WKT 2010 12 15 20 49 55 31.3200 -97.3300 251.000 30.0 167.889 5.870 -999.990 -999.990 1.679 ..P WKT 2010 12 15 20 54 55 31.3200 -97.3300 251.000 122.0 172.336 5.290 -999.990 -999.990 1.723 ..P WKT 2010 12 15 20 59 55 31.3200 -97.3300 251.000 457.0 164.255 5.330 -999.990 -999.990 1.643 ..P WKT 2010 12 15 21 09 55 31.3200 -97.3300 251.000 30.0 167.056 4.810 -999.990 -999.990 1.671 ..P WKT 2010 12 15 21 14 55 31.3200 -97.3300 251.000 122.0 170.473 5.260 -999.990 -999.990 1.705 ..P WKT 2010 12 15 21 19 55 31.3200 -97.3300 251.000 457.0 166.163 6.140 -999.990 -999.990 1.662 ..P WKT 2010 12 15 21 24 55 31.3200 -97.3300 251.000 30.0 167.183 4.940 -999.990 -999.990 1.672 ..P WKT 2010 12 15 21 29 55 31.3200 -97.3300 251.000 122.0 162.342 4.800 -999.990 -999.990 1.623 ..P WKT 2010 12 15 21 34 55 31.3200 -97.3300 251.000 457.0 161.230 4.570 -999.990 -999.990 1.612 ..P WKT 2010 12 15 21 44 55 31.3200 -97.3300 251.000 30.0 152.692 3.870 -999.990 -999.990 1.527 ..P WKT 2010 12 15 21 49 55 31.3200 -97.3300 251.000 122.0 159.913 5.040 -999.990 -999.990 1.599 ..P WKT 2010 12 15 21 54 55 31.3200 -97.3300 251.000 457.0 159.677 5.140 -999.990 -999.990 1.597 ..P WKT 2010 12 15 21 59 55 31.3200 -97.3300 251.000 30.0 152.785 4.450 -999.990 -999.990 1.528 ..P WKT 2010 12 15 22 04 55 31.3200 -97.3300 251.000 122.0 148.290 3.860 -999.990 -999.990 1.483 ..P WKT 2010 12 15 22 09 55 31.3200 -97.3300 251.000 457.0 152.581 5.060 -999.990 -999.990 1.526 ..P WKT 2010 12 15 22 19 55 31.3200 -97.3300 251.000 30.0 146.122 3.790 -999.990 -999.990 1.461 ..P WKT 2010 12 15 22 24 55 31.3200 -97.3300 251.000 122.0 156.133 3.920 -999.990 -999.990 1.561 ..P WKT 2010 12 15 22 29 55 31.3200 -97.3300 251.000 457.0 154.300 4.420 -999.990 -999.990 1.543 ..P WKT 2010 12 15 22 34 55 31.3200 -97.3300 251.000 30.0 149.010 4.900 -999.990 -999.990 1.490 ..P WKT 2010 12 15 22 39 55 31.3200 -97.3300 251.000 122.0 147.445 4.440 -999.990 -999.990 1.474 ..P WKT 2010 12 15 22 44 55 31.3200 -97.3300 251.000 457.0 153.195 7.090 -999.990 -999.990 1.532 ..P WKT 2010 12 15 22 54 55 31.3200 -97.3300 251.000 30.0 143.169 4.870 -999.990 -999.990 1.432 ..P WKT 2010 12 15 22 59 55 31.3200 -97.3300 251.000 122.0 146.012 5.250 -999.990 -999.990 1.460 ..P WKT 2010 12 15 23 04 55 31.3200 -97.3300 251.000 457.0 142.605 5.260 -999.990 -999.990 1.426 ..P WKT 2010 12 15 23 09 55 31.3200 -97.3300 251.000 30.0 141.193 4.390 -999.990 -999.990 1.412 ..P WKT 2010 12 15 23 14 55 31.3200 -97.3300 251.000 122.0 138.054 4.700 -999.990 -999.990 1.381 ..P WKT 2010 12 15 23 19 55 31.3200 -97.3300 251.000 457.0 145.815 4.590 -999.990 -999.990 1.458 ..P WKT 2010 12 15 23 29 55 31.3200 -97.3300 251.000 30.0 145.676 4.060 -999.990 -999.990 1.457 ..P WKT 2010 12 15 23 34 55 31.3200 -97.3300 251.000 122.0 146.683 4.650 -999.990 -999.990 1.467 ..P WKT 2010 12 15 23 39 55 31.3200 -97.3300 251.000 457.0 138.255 4.960 -999.990 -999.990 1.383 ..P WKT 2010 12 15 23 44 55 31.3200 -97.3300 251.000 30.0 141.654 5.770 -999.990 -999.990 1.417 ..P WKT 2010 12 15 23 49 55 31.3200 -97.3300 251.000 122.0 145.451 6.130 -999.990 -999.990 1.455 ..P WKT 2010 12 16 00 09 55 31.3200 -97.3300 251.000 457.0 141.690 5.080 -999.990 -999.990 1.417 ..P WKT 2010 12 16 00 10 25 31.3200 -97.3300 251.000 457.0 138.803 5.260 -999.990 -999.990 1.388 ..P WKT 2010 12 16 00 10 55 31.3200 -97.3300 251.000 457.0 139.105 4.800 -999.990 -999.990 1.391 ..P WKT 2010 12 16 00 11 25 31.3200 -97.3300 251.000 457.0 135.288 5.340 -999.990 -999.990 1.353 ..P WKT 2010 12 16 00 11 55 31.3200 -97.3300 251.000 457.0 137.982 5.700 -999.990 -999.990 1.380 ..P WKT 2010 12 16 00 12 25 31.3200 -97.3300 251.000 457.0 139.081 4.730 -999.990 -999.990 1.391 ..P WKT 2010 12 16 00 12 55 31.3200 -97.3300 251.000 457.0 139.117 5.080 -999.990 -999.990 1.391 ..P WKT 2010 12 16 00 13 25 31.3200 -97.3300 251.000 457.0 142.209 4.930 -999.990 -999.990 1.422 ..P WKT 2010 12 16 00 13 55 31.3200 -97.3300 251.000 457.0 140.651 5.830 -999.990 -999.990 1.407 ..P WKT 2010 12 16 00 14 25 31.3200 -97.3300 251.000 457.0 144.408 5.030 -999.990 -999.990 1.444 ..P WKT 2010 12 16 00 14 55 31.3200 -97.3300 251.000 457.0 140.856 4.700 -999.990 -999.990 1.409 ..P WKT 2010 12 16 00 19 55 31.3200 -97.3300 251.000 30.0 137.231 5.050 -999.990 -999.990 1.372 ..P WKT 2010 12 16 00 24 55 31.3200 -97.3300 251.000 122.0 141.845 5.470 -999.990 -999.990 1.418 ..P WKT 2010 12 16 00 29 55 31.3200 -97.3300 251.000 457.0 140.080 5.240 -999.990 -999.990 1.401 ..P WKT 2010 12 16 00 34 55 31.3200 -97.3300 251.000 30.0 144.430 4.300 -999.990 -999.990 1.444 ..P WKT 2010 12 16 00 39 55 31.3200 -97.3300 251.000 122.0 139.472 5.400 -999.990 -999.990 1.395 ..P WKT 2010 12 16 00 44 55 31.3200 -97.3300 251.000 457.0 138.238 3.930 -999.990 -999.990 1.382 ..P WKT 2010 12 16 00 54 55 31.3200 -97.3300 251.000 30.0 133.147 3.730 -999.990 -999.990 1.331 ..P WKT 2010 12 16 00 59 55 31.3200 -97.3300 251.000 122.0 136.741 3.890 -999.990 -999.990 1.367 ..P WKT 2010 12 16 01 04 55 31.3200 -97.3300 251.000 457.0 131.288 4.590 -999.990 -999.990 1.313 ..P WKT 2010 12 16 01 09 55 31.3200 -97.3300 251.000 30.0 135.947 3.770 -999.990 -999.990 1.359 ..P WKT 2010 12 16 01 14 55 31.3200 -97.3300 251.000 122.0 132.356 3.920 -999.990 -999.990 1.324 ..P WKT 2010 12 16 01 19 55 31.3200 -97.3300 251.000 457.0 130.893 3.970 -999.990 -999.990 1.309 ..P WKT 2010 12 16 01 29 55 31.3200 -97.3300 251.000 30.0 135.043 4.150 -999.990 -999.990 1.350 ..P WKT 2010 12 16 01 34 55 31.3200 -97.3300 251.000 122.0 133.466 3.840 -999.990 -999.990 1.335 ..P WKT 2010 12 16 01 39 55 31.3200 -97.3300 251.000 457.0 135.085 3.790 -999.990 -999.990 1.351 ..P WKT 2010 12 16 01 44 55 31.3200 -97.3300 251.000 30.0 139.636 3.630 -999.990 -999.990 1.396 ..P WKT 2010 12 16 01 49 55 31.3200 -97.3300 251.000 122.0 146.320 3.760 -999.990 -999.990 1.463 ..P WKT 2010 12 16 01 54 55 31.3200 -97.3300 251.000 457.0 149.541 4.750 -999.990 -999.990 1.495 ..P WKT 2010 12 16 02 04 55 31.3200 -97.3300 251.000 30.0 134.200 3.560 -999.990 -999.990 1.342 ..P WKT 2010 12 16 02 09 55 31.3200 -97.3300 251.000 122.0 135.363 3.290 -999.990 -999.990 1.354 ..P WKT 2010 12 16 02 14 55 31.3200 -97.3300 251.000 457.0 139.194 3.880 -999.990 -999.990 1.392 ..P WKT 2010 12 16 02 19 55 31.3200 -97.3300 251.000 30.0 136.092 3.730 -999.990 -999.990 1.361 ..P WKT 2010 12 16 02 24 55 31.3200 -97.3300 251.000 122.0 140.457 3.500 -999.990 -999.990 1.405 ..P WKT 2010 12 16 02 29 55 31.3200 -97.3300 251.000 457.0 141.623 4.740 -999.990 -999.990 1.416 ..P WKT 2010 12 16 02 39 55 31.3200 -97.3300 251.000 30.0 138.674 3.700 -999.990 -999.990 1.387 ..P WKT 2010 12 16 02 44 55 31.3200 -97.3300 251.000 122.0 148.570 3.330 -999.990 -999.990 1.486 ..P WKT 2010 12 16 02 49 55 31.3200 -97.3300 251.000 457.0 142.187 3.590 -999.990 -999.990 1.422 ..P WKT 2010 12 16 02 54 55 31.3200 -97.3300 251.000 30.0 139.005 3.370 -999.990 -999.990 1.390 ..P WKT 2010 12 16 02 59 55 31.3200 -97.3300 251.000 122.0 149.040 3.750 -999.990 -999.990 1.490 ..P WKT 2010 12 16 03 04 55 31.3200 -97.3300 251.000 457.0 134.107 3.170 -999.990 -999.990 1.341 ..P WKT 2010 12 16 03 14 55 31.3200 -97.3300 251.000 30.0 144.510 3.520 -999.990 -999.990 1.445 ..P WKT 2010 12 16 03 19 55 31.3200 -97.3300 251.000 122.0 146.346 3.630 -999.990 -999.990 1.463 ..P WKT 2010 12 16 03 24 55 31.3200 -97.3300 251.000 457.0 171.163 4.350 -999.990 -999.990 1.712 ..P WKT 2010 12 16 03 29 55 31.3200 -97.3300 251.000 30.0 143.203 4.440 -999.990 -999.990 1.432 ..P WKT 2010 12 16 03 34 55 31.3200 -97.3300 251.000 122.0 137.422 3.880 -999.990 -999.990 1.374 ..P WKT 2010 12 16 03 39 55 31.3200 -97.3300 251.000 457.0 138.856 4.940 -999.990 -999.990 1.389 ..P WKT 2010 12 16 03 49 55 31.3200 -97.3300 251.000 30.0 146.998 4.210 -999.990 -999.990 1.470 ..P WKT 2010 12 16 03 54 55 31.3200 -97.3300 251.000 122.0 137.126 4.490 -999.990 -999.990 1.371 ..P WKT 2010 12 16 03 59 55 31.3200 -97.3300 251.000 457.0 125.244 4.530 -999.990 -999.990 1.252 ..P WKT 2010 12 16 04 04 55 31.3200 -97.3300 251.000 30.0 136.366 3.780 -999.990 -999.990 1.364 ..P WKT 2010 12 16 04 09 55 31.3200 -97.3300 251.000 122.0 138.260 3.730 -999.990 -999.990 1.383 ..P WKT 2010 12 16 04 14 55 31.3200 -97.3300 251.000 457.0 136.944 3.910 -999.990 -999.990 1.369 ..P WKT 2010 12 16 04 24 55 31.3200 -97.3300 251.000 30.0 134.558 3.550 -999.990 -999.990 1.346 ..P WKT 2010 12 16 04 29 55 31.3200 -97.3300 251.000 122.0 140.583 3.480 -999.990 -999.990 1.406 ..P WKT 2010 12 16 04 34 55 31.3200 -97.3300 251.000 457.0 133.491 3.490 -999.990 -999.990 1.335 ..P WKT 2010 12 16 04 39 55 31.3200 -97.3300 251.000 30.0 139.250 3.890 -999.990 -999.990 1.393 ..P WKT 2010 12 16 04 44 55 31.3200 -97.3300 251.000 122.0 136.708 3.570 -999.990 -999.990 1.367 ..P WKT 2010 12 16 04 49 55 31.3200 -97.3300 251.000 457.0 124.523 3.280 -999.990 -999.990 1.245 ..P WKT 2010 12 16 05 04 55 31.3200 -97.3300 251.000 30.0 130.391 3.380 -999.990 -999.990 1.304 ..P WKT 2010 12 16 05 09 55 31.3200 -97.3300 251.000 122.0 141.300 3.720 -999.990 -999.990 1.413 ..P WKT 2010 12 16 05 14 55 31.3200 -97.3300 251.000 457.0 130.767 4.550 -999.990 -999.990 1.308 ..P WKT 2010 12 16 05 19 55 31.3200 -97.3300 251.000 30.0 141.411 3.670 -999.990 -999.990 1.414 ..P WKT 2010 12 16 05 24 55 31.3200 -97.3300 251.000 122.0 142.941 3.760 -999.990 -999.990 1.429 ..P WKT 2010 12 16 05 29 55 31.3200 -97.3300 251.000 457.0 142.326 3.990 -999.990 -999.990 1.423 ..P WKT 2010 12 16 05 39 55 31.3200 -97.3300 251.000 30.0 142.194 3.300 -999.990 -999.990 1.422 ..P WKT 2010 12 16 05 44 55 31.3200 -97.3300 251.000 122.0 143.748 3.870 -999.990 -999.990 1.437 ..P WKT 2010 12 16 05 49 55 31.3200 -97.3300 251.000 457.0 139.133 4.000 -999.990 -999.990 1.391 ..P WKT 2010 12 16 05 54 55 31.3200 -97.3300 251.000 30.0 139.346 4.010 -999.990 -999.990 1.393 ..P WKT 2010 12 16 05 59 55 31.3200 -97.3300 251.000 122.0 143.317 3.520 -999.990 -999.990 1.433 ..P WKT 2010 12 16 06 04 55 31.3200 -97.3300 251.000 457.0 136.284 3.860 -999.990 -999.990 1.363 ..P WKT 2010 12 16 06 14 55 31.3200 -97.3300 251.000 30.0 138.225 4.220 -999.990 -999.990 1.382 ..P WKT 2010 12 16 06 19 55 31.3200 -97.3300 251.000 122.0 137.940 3.960 -999.990 -999.990 1.379 ..P WKT 2010 12 16 06 24 55 31.3200 -97.3300 251.000 457.0 129.329 4.280 -999.990 -999.990 1.293 ..P WKT 2010 12 16 06 29 55 31.3200 -97.3300 251.000 30.0 133.071 4.050 -999.990 -999.990 1.331 ..P WKT 2010 12 16 06 34 55 31.3200 -97.3300 251.000 122.0 137.218 4.250 -999.990 -999.990 1.372 ..P WKT 2010 12 16 06 39 55 31.3200 -97.3300 251.000 457.0 123.362 3.500 -999.990 -999.990 1.234 ..P WKT 2010 12 16 06 49 55 31.3200 -97.3300 251.000 30.0 137.148 4.560 -999.990 -999.990 1.371 ..P WKT 2010 12 16 06 54 55 31.3200 -97.3300 251.000 122.0 143.563 3.700 -999.990 -999.990 1.436 ..P WKT 2010 12 16 06 59 55 31.3200 -97.3300 251.000 457.0 127.531 4.160 -999.990 -999.990 1.275 ..P WKT 2010 12 16 07 04 55 31.3200 -97.3300 251.000 30.0 135.695 3.950 -999.990 -999.990 1.357 ..P WKT 2010 12 16 07 09 55 31.3200 -97.3300 251.000 122.0 141.037 3.370 -999.990 -999.990 1.410 ..P WKT 2010 12 16 07 14 55 31.3200 -97.3300 251.000 457.0 138.850 3.290 -999.990 -999.990 1.389 ..P WKT 2010 12 16 07 24 55 31.3200 -97.3300 251.000 30.0 134.415 3.530 -999.990 -999.990 1.344 ..P WKT 2010 12 16 07 29 55 31.3200 -97.3300 251.000 122.0 139.434 4.610 -999.990 -999.990 1.394 ..P WKT 2010 12 16 07 34 55 31.3200 -97.3300 251.000 457.0 136.111 3.940 -999.990 -999.990 1.361 ..P WKT 2010 12 16 07 39 55 31.3200 -97.3300 251.000 30.0 144.361 4.940 -999.990 -999.990 1.444 ..P WKT 2010 12 16 07 44 55 31.3200 -97.3300 251.000 122.0 140.768 4.740 -999.990 -999.990 1.408 ..P WKT 2010 12 16 07 49 55 31.3200 -97.3300 251.000 457.0 136.098 4.560 -999.990 -999.990 1.361 ..P WKT 2010 12 16 07 59 55 31.3200 -97.3300 251.000 30.0 130.812 4.290 -999.990 -999.990 1.308 ..P WKT 2010 12 16 08 04 55 31.3200 -97.3300 251.000 122.0 139.087 4.230 -999.990 -999.990 1.391 ..P WKT 2010 12 16 08 09 55 31.3200 -97.3300 251.000 457.0 132.008 3.900 -999.990 -999.990 1.320 ..P WKT 2010 12 16 08 14 55 31.3200 -97.3300 251.000 30.0 134.088 4.550 -999.990 -999.990 1.341 ..P WKT 2010 12 16 08 19 55 31.3200 -97.3300 251.000 122.0 137.247 3.640 -999.990 -999.990 1.372 ..P WKT 2010 12 16 08 24 55 31.3200 -97.3300 251.000 457.0 131.782 4.810 -999.990 -999.990 1.318 ..P WKT 2010 12 16 08 34 55 31.3200 -97.3300 251.000 30.0 134.692 3.340 -999.990 -999.990 1.347 ..P WKT 2010 12 16 08 39 55 31.3200 -97.3300 251.000 122.0 134.984 3.380 -999.990 -999.990 1.350 ..P WKT 2010 12 16 08 44 55 31.3200 -97.3300 251.000 457.0 140.398 3.670 -999.990 -999.990 1.404 ..P WKT 2010 12 16 08 49 55 31.3200 -97.3300 251.000 30.0 137.992 3.890 -999.990 -999.990 1.380 ..P WKT 2010 12 16 08 54 55 31.3200 -97.3300 251.000 122.0 137.205 4.260 -999.990 -999.990 1.372 ..P WKT 2010 12 16 08 59 55 31.3200 -97.3300 251.000 457.0 139.115 3.760 -999.990 -999.990 1.391 ..P WKT 2010 12 16 09 09 55 31.3200 -97.3300 251.000 30.0 134.494 3.800 -999.990 -999.990 1.345 ..P WKT 2010 12 16 09 14 55 31.3200 -97.3300 251.000 122.0 132.819 3.830 -999.990 -999.990 1.328 ..P WKT 2010 12 16 09 19 55 31.3200 -97.3300 251.000 457.0 147.340 3.570 -999.990 -999.990 1.473 ..P WKT 2010 12 16 09 24 55 31.3200 -97.3300 251.000 30.0 135.137 5.460 -999.990 -999.990 1.351 ..P WKT 2010 12 16 09 29 55 31.3200 -97.3300 251.000 122.0 138.051 4.420 -999.990 -999.990 1.381 ..P WKT 2010 12 16 09 34 55 31.3200 -97.3300 251.000 457.0 139.886 3.490 -999.990 -999.990 1.399 ..P WKT 2010 12 16 09 44 55 31.3200 -97.3300 251.000 30.0 131.787 3.480 -999.990 -999.990 1.318 ..P WKT 2010 12 16 09 49 55 31.3200 -97.3300 251.000 122.0 133.468 4.930 -999.990 -999.990 1.335 ..P WKT 2010 12 16 09 54 55 31.3200 -97.3300 251.000 457.0 144.336 4.460 -999.990 -999.990 1.443 ..P WKT 2010 12 16 09 59 55 31.3200 -97.3300 251.000 30.0 135.209 4.640 -999.990 -999.990 1.352 ..P WKT 2010 12 16 10 04 55 31.3200 -97.3300 251.000 122.0 132.971 4.740 -999.990 -999.990 1.330 ..P WKT 2010 12 16 10 09 55 31.3200 -97.3300 251.000 457.0 141.411 5.040 -999.990 -999.990 1.414 ..P WKT 2010 12 16 10 19 55 31.3200 -97.3300 251.000 30.0 133.246 5.080 -999.990 -999.990 1.332 ..P WKT 2010 12 16 10 24 55 31.3200 -97.3300 251.000 122.0 145.573 5.320 -999.990 -999.990 1.456 ..P WKT 2010 12 16 10 29 55 31.3200 -97.3300 251.000 457.0 152.087 4.980 -999.990 -999.990 1.521 ..P WKT 2010 12 16 10 34 55 31.3200 -97.3300 251.000 30.0 137.503 5.130 -999.990 -999.990 1.375 ..P WKT 2010 12 16 10 39 55 31.3200 -97.3300 251.000 122.0 144.829 4.640 -999.990 -999.990 1.448 ..P WKT 2010 12 16 10 44 55 31.3200 -97.3300 251.000 457.0 147.829 4.120 -999.990 -999.990 1.478 ..P WKT 2010 12 16 10 54 55 31.3200 -97.3300 251.000 30.0 165.315 4.320 -999.990 -999.990 1.653 ..P WKT 2010 12 16 10 59 55 31.3200 -97.3300 251.000 122.0 172.901 4.230 -999.990 -999.990 1.729 ..P WKT 2010 12 16 11 04 55 31.3200 -97.3300 251.000 457.0 155.986 5.700 -999.990 -999.990 1.560 ..P WKT 2010 12 16 11 09 55 31.3200 -97.3300 251.000 30.0 186.457 5.020 -999.990 -999.990 1.865 ..P WKT 2010 12 16 11 14 55 31.3200 -97.3300 251.000 122.0 183.487 4.110 -999.990 -999.990 1.835 ..P WKT 2010 12 16 11 19 55 31.3200 -97.3300 251.000 457.0 157.220 3.920 -999.990 -999.990 1.572 ..P WKT 2010 12 16 11 29 55 31.3200 -97.3300 251.000 30.0 186.361 4.090 -999.990 -999.990 1.864 ..P WKT 2010 12 16 11 34 55 31.3200 -97.3300 251.000 122.0 186.915 4.890 -999.990 -999.990 1.869 ..P WKT 2010 12 16 11 39 55 31.3200 -97.3300 251.000 457.0 159.146 4.110 -999.990 -999.990 1.591 ..P WKT 2010 12 16 11 44 55 31.3200 -97.3300 251.000 30.0 188.023 4.330 -999.990 -999.990 1.880 ..P WKT 2010 12 16 11 49 55 31.3200 -97.3300 251.000 122.0 183.020 5.320 -999.990 -999.990 1.830 ..P WKT 2010 12 16 12 09 55 31.3200 -97.3300 251.000 457.0 165.715 3.970 -999.990 -999.990 1.657 ..P WKT 2010 12 16 12 10 25 31.3200 -97.3300 251.000 457.0 167.597 3.820 -999.990 -999.990 1.676 ..P WKT 2010 12 16 12 10 55 31.3200 -97.3300 251.000 457.0 162.972 3.910 -999.990 -999.990 1.630 ..P WKT 2010 12 16 12 11 25 31.3200 -97.3300 251.000 457.0 163.769 3.750 -999.990 -999.990 1.638 ..P WKT 2010 12 16 12 11 55 31.3200 -97.3300 251.000 457.0 166.193 4.000 -999.990 -999.990 1.662 ..P WKT 2010 12 16 12 12 25 31.3200 -97.3300 251.000 457.0 164.550 4.850 -999.990 -999.990 1.646 ..P WKT 2010 12 16 12 12 55 31.3200 -97.3300 251.000 457.0 162.636 3.920 -999.990 -999.990 1.626 ..P WKT 2010 12 16 12 13 25 31.3200 -97.3300 251.000 457.0 164.246 3.820 -999.990 -999.990 1.642 ..P WKT 2010 12 16 12 13 55 31.3200 -97.3300 251.000 457.0 159.893 3.880 -999.990 -999.990 1.599 ..P WKT 2010 12 16 12 14 25 31.3200 -97.3300 251.000 457.0 160.419 5.140 -999.990 -999.990 1.604 ..P WKT 2010 12 16 12 14 55 31.3200 -97.3300 251.000 457.0 157.692 4.060 -999.990 -999.990 1.577 ..P WKT 2010 12 16 12 19 55 31.3200 -97.3300 251.000 30.0 179.211 4.570 -999.990 -999.990 1.792 ..P WKT 2010 12 16 12 24 55 31.3200 -97.3300 251.000 122.0 179.046 4.780 -999.990 -999.990 1.790 ..P WKT 2010 12 16 12 29 55 31.3200 -97.3300 251.000 457.0 171.838 4.360 -999.990 -999.990 1.718 ..P WKT 2010 12 16 12 34 55 31.3200 -97.3300 251.000 30.0 177.904 4.580 -999.990 -999.990 1.779 ..P WKT 2010 12 16 12 39 55 31.3200 -97.3300 251.000 122.0 178.822 5.590 -999.990 -999.990 1.788 ..P WKT 2010 12 16 12 44 55 31.3200 -97.3300 251.000 457.0 179.469 5.020 -999.990 -999.990 1.795 ..P WKT 2010 12 16 12 54 55 31.3200 -97.3300 251.000 30.0 179.376 5.460 -999.990 -999.990 1.794 ..P WKT 2010 12 16 12 59 55 31.3200 -97.3300 251.000 122.0 185.400 4.570 -999.990 -999.990 1.854 ..P WKT 2010 12 16 13 04 55 31.3200 -97.3300 251.000 457.0 179.518 4.380 -999.990 -999.990 1.795 ..P WKT 2010 12 16 13 09 55 31.3200 -97.3300 251.000 30.0 183.106 4.410 -999.990 -999.990 1.831 ..P WKT 2010 12 16 13 14 55 31.3200 -97.3300 251.000 122.0 182.365 4.240 -999.990 -999.990 1.824 ..P WKT 2010 12 16 13 19 55 31.3200 -97.3300 251.000 457.0 180.543 4.500 -999.990 -999.990 1.805 ..P WKT 2010 12 16 13 29 55 31.3200 -97.3300 251.000 30.0 179.025 4.570 -999.990 -999.990 1.790 ..P WKT 2010 12 16 13 34 55 31.3200 -97.3300 251.000 122.0 187.434 4.030 -999.990 -999.990 1.874 ..P WKT 2010 12 16 13 39 55 31.3200 -97.3300 251.000 457.0 182.873 3.930 -999.990 -999.990 1.829 ..P WKT 2010 12 16 13 44 55 31.3200 -97.3300 251.000 30.0 184.796 4.380 -999.990 -999.990 1.848 ..P WKT 2010 12 16 13 49 55 31.3200 -97.3300 251.000 122.0 185.097 4.710 -999.990 -999.990 1.851 ..P WKT 2010 12 16 13 54 55 31.3200 -97.3300 251.000 457.0 183.103 4.380 -999.990 -999.990 1.831 ..P WKT 2010 12 16 14 04 55 31.3200 -97.3300 251.000 30.0 187.563 4.270 -999.990 -999.990 1.876 ..P WKT 2010 12 16 14 09 55 31.3200 -97.3300 251.000 122.0 184.703 4.610 -999.990 -999.990 1.847 ..P WKT 2010 12 16 14 14 55 31.3200 -97.3300 251.000 457.0 178.876 4.220 -999.990 -999.990 1.789 ..P WKT 2010 12 16 14 19 55 31.3200 -97.3300 251.000 30.0 179.660 4.140 -999.990 -999.990 1.797 ..P WKT 2010 12 16 14 24 55 31.3200 -97.3300 251.000 122.0 180.579 5.250 -999.990 -999.990 1.806 ..P WKT 2010 12 16 14 29 55 31.3200 -97.3300 251.000 457.0 180.553 4.480 -999.990 -999.990 1.806 ..P WKT 2010 12 16 14 39 55 31.3200 -97.3300 251.000 30.0 183.371 4.180 -999.990 -999.990 1.834 ..P WKT 2010 12 16 14 44 55 31.3200 -97.3300 251.000 122.0 179.072 5.420 -999.990 -999.990 1.791 ..P WKT 2010 12 16 14 49 55 31.3200 -97.3300 251.000 457.0 182.049 5.130 -999.990 -999.990 1.820 ..P WKT 2010 12 16 14 54 55 31.3200 -97.3300 251.000 30.0 179.906 4.760 -999.990 -999.990 1.799 ..P WKT 2010 12 16 14 59 55 31.3200 -97.3300 251.000 122.0 185.171 4.340 -999.990 -999.990 1.852 ..P WKT 2010 12 16 15 04 55 31.3200 -97.3300 251.000 457.0 184.510 4.120 -999.990 -999.990 1.845 ..P WKT 2010 12 16 15 14 55 31.3200 -97.3300 251.000 30.0 183.593 4.170 -999.990 -999.990 1.836 ..P WKT 2010 12 16 15 19 55 31.3200 -97.3300 251.000 122.0 178.761 4.470 -999.990 -999.990 1.788 ..P WKT 2010 12 16 15 24 55 31.3200 -97.3300 251.000 457.0 176.757 4.910 -999.990 -999.990 1.768 ..P WKT 2010 12 16 15 29 55 31.3200 -97.3300 251.000 30.0 177.174 5.040 -999.990 -999.990 1.772 ..P WKT 2010 12 16 15 34 55 31.3200 -97.3300 251.000 122.0 177.457 5.050 -999.990 -999.990 1.775 ..P WKT 2010 12 16 15 39 55 31.3200 -97.3300 251.000 457.0 179.756 3.920 -999.990 -999.990 1.798 ..P WKT 2010 12 16 15 49 55 31.3200 -97.3300 251.000 30.0 179.955 4.440 -999.990 -999.990 1.800 ..P WKT 2010 12 16 15 54 55 31.3200 -97.3300 251.000 122.0 177.722 4.520 -999.990 -999.990 1.777 ..P WKT 2010 12 16 15 59 55 31.3200 -97.3300 251.000 457.0 174.819 4.990 -999.990 -999.990 1.748 ..P WKT 2010 12 16 16 04 55 31.3200 -97.3300 251.000 30.0 178.095 4.690 -999.990 -999.990 1.781 ..P WKT 2010 12 16 16 09 55 31.3200 -97.3300 251.000 122.0 175.729 4.950 -999.990 -999.990 1.757 ..P WKT 2010 12 16 16 14 55 31.3200 -97.3300 251.000 457.0 173.633 5.770 -999.990 -999.990 1.736 ..P WKT 2010 12 16 16 24 55 31.3200 -97.3300 251.000 30.0 175.560 4.840 -999.990 -999.990 1.756 ..P WKT 2010 12 16 16 29 55 31.3200 -97.3300 251.000 122.0 168.845 4.650 -999.990 -999.990 1.688 ..P WKT 2010 12 16 16 34 55 31.3200 -97.3300 251.000 457.0 179.575 4.710 -999.990 -999.990 1.796 ..P WKT 2010 12 16 16 39 55 31.3200 -97.3300 251.000 30.0 171.788 4.930 -999.990 -999.990 1.718 ..P WKT 2010 12 16 16 44 55 31.3200 -97.3300 251.000 122.0 180.636 4.510 -999.990 -999.990 1.806 ..P WKT 2010 12 16 16 49 55 31.3200 -97.3300 251.000 457.0 172.852 4.070 -999.990 -999.990 1.729 ..P WKT 2010 12 16 17 04 55 31.3200 -97.3300 251.000 30.0 169.948 4.480 -999.990 -999.990 1.699 ..P WKT 2010 12 16 17 09 55 31.3200 -97.3300 251.000 122.0 165.148 4.950 -999.990 -999.990 1.651 ..P WKT 2010 12 16 17 14 55 31.3200 -97.3300 251.000 457.0 168.389 5.800 -999.990 -999.990 1.684 ..P WKT 2010 12 16 17 19 55 31.3200 -97.3300 251.000 30.0 172.164 4.180 -999.990 -999.990 1.722 ..P WKT 2010 12 16 17 24 55 31.3200 -97.3300 251.000 122.0 170.849 4.360 -999.990 -999.990 1.708 ..P WKT 2010 12 16 17 29 55 31.3200 -97.3300 251.000 457.0 170.338 4.750 -999.990 -999.990 1.703 ..P WKT 2010 12 16 17 39 55 31.3200 -97.3300 251.000 30.0 171.410 4.410 -999.990 -999.990 1.714 ..P WKT 2010 12 16 17 44 55 31.3200 -97.3300 251.000 122.0 179.683 5.120 -999.990 -999.990 1.797 ..P WKT 2010 12 16 17 49 55 31.3200 -97.3300 251.000 457.0 173.504 4.740 -999.990 -999.990 1.735 ..P WKT 2010 12 16 17 54 55 31.3200 -97.3300 251.000 30.0 178.161 4.620 -999.990 -999.990 1.782 ..P WKT 2010 12 16 17 59 55 31.3200 -97.3300 251.000 122.0 178.003 5.500 -999.990 -999.990 1.780 ..P WKT 2010 12 16 18 04 55 31.3200 -97.3300 251.000 457.0 173.833 4.720 -999.990 -999.990 1.738 ..P WKT 2010 12 16 18 14 55 31.3200 -97.3300 251.000 30.0 177.108 4.450 -999.990 -999.990 1.771 ..P WKT 2010 12 16 18 19 55 31.3200 -97.3300 251.000 122.0 174.124 5.120 -999.990 -999.990 1.741 ..P WKT 2010 12 16 18 24 55 31.3200 -97.3300 251.000 457.0 175.417 5.270 -999.990 -999.990 1.754 ..P WKT 2010 12 16 18 29 55 31.3200 -97.3300 251.000 30.0 171.500 6.460 -999.990 -999.990 1.715 ..P WKT 2010 12 16 18 34 55 31.3200 -97.3300 251.000 122.0 181.741 5.340 -999.990 -999.990 1.817 ..P WKT 2010 12 16 18 39 55 31.3200 -97.3300 251.000 457.0 176.756 4.290 -999.990 -999.990 1.768 ..P WKT 2010 12 16 18 49 55 31.3200 -97.3300 251.000 30.0 180.902 4.700 -999.990 -999.990 1.809 ..P WKT 2010 12 16 18 54 55 31.3200 -97.3300 251.000 122.0 180.686 5.470 -999.990 -999.990 1.807 ..P WKT 2010 12 16 18 59 55 31.3200 -97.3300 251.000 457.0 183.806 5.600 -999.990 -999.990 1.838 ..P WKT 2010 12 16 19 04 55 31.3200 -97.3300 251.000 30.0 185.858 6.550 -999.990 -999.990 1.859 ..P WKT 2010 12 16 19 09 55 31.3200 -97.3300 251.000 122.0 179.772 6.220 -999.990 -999.990 1.798 ..P WKT 2010 12 16 19 14 55 31.3200 -97.3300 251.000 457.0 182.491 5.390 -999.990 -999.990 1.825 ..P WKT 2010 12 16 19 24 55 31.3200 -97.3300 251.000 30.0 184.497 4.820 -999.990 -999.990 1.845 ..P WKT 2010 12 16 19 29 55 31.3200 -97.3300 251.000 122.0 180.986 6.380 -999.990 -999.990 1.810 ..P WKT 2010 12 16 19 34 55 31.3200 -97.3300 251.000 457.0 186.805 6.640 -999.990 -999.990 1.868 ..P WKT 2010 12 16 19 39 55 31.3200 -97.3300 251.000 30.0 182.896 5.690 -999.990 -999.990 1.829 ..P WKT 2010 12 16 19 44 55 31.3200 -97.3300 251.000 122.0 184.583 5.390 -999.990 -999.990 1.846 ..P WKT 2010 12 16 19 49 55 31.3200 -97.3300 251.000 457.0 179.877 4.540 -999.990 -999.990 1.799 ..P WKT 2010 12 16 19 59 55 31.3200 -97.3300 251.000 30.0 174.769 4.530 -999.990 -999.990 1.748 ..P WKT 2010 12 16 20 04 55 31.3200 -97.3300 251.000 122.0 172.900 5.240 -999.990 -999.990 1.729 ..P WKT 2010 12 16 20 09 55 31.3200 -97.3300 251.000 457.0 168.903 5.510 -999.990 -999.990 1.689 ..P WKT 2010 12 16 20 14 55 31.3200 -97.3300 251.000 30.0 175.818 5.170 -999.990 -999.990 1.758 ..P WKT 2010 12 16 20 19 55 31.3200 -97.3300 251.000 122.0 173.684 4.790 -999.990 -999.990 1.737 ..P WKT 2010 12 16 20 24 55 31.3200 -97.3300 251.000 457.0 175.541 5.150 -999.990 -999.990 1.755 ..P WKT 2010 12 16 20 34 55 31.3200 -97.3300 251.000 30.0 172.872 4.530 -999.990 -999.990 1.729 ..P WKT 2010 12 16 20 39 55 31.3200 -97.3300 251.000 122.0 177.121 4.730 -999.990 -999.990 1.771 ..P WKT 2010 12 16 20 44 55 31.3200 -97.3300 251.000 457.0 181.102 5.110 -999.990 -999.990 1.811 ..P WKT 2010 12 16 20 49 55 31.3200 -97.3300 251.000 30.0 177.907 6.460 -999.990 -999.990 1.779 ..P WKT 2010 12 16 20 54 55 31.3200 -97.3300 251.000 122.0 179.230 6.280 -999.990 -999.990 1.792 ..P WKT 2010 12 16 20 59 55 31.3200 -97.3300 251.000 457.0 178.426 6.300 -999.990 -999.990 1.784 ..P WKT 2010 12 16 21 09 55 31.3200 -97.3300 251.000 30.0 171.549 6.440 -999.990 -999.990 1.715 ..P WKT 2010 12 16 21 14 55 31.3200 -97.3300 251.000 122.0 175.299 6.270 -999.990 -999.990 1.753 ..P WKT 2010 12 16 21 19 55 31.3200 -97.3300 251.000 457.0 167.900 6.060 -999.990 -999.990 1.679 ..P WKT 2010 12 16 21 24 55 31.3200 -97.3300 251.000 30.0 179.611 5.910 -999.990 -999.990 1.796 ..P WKT 2010 12 16 21 29 55 31.3200 -97.3300 251.000 122.0 168.234 5.520 -999.990 -999.990 1.682 ..P WKT 2010 12 16 21 34 55 31.3200 -97.3300 251.000 457.0 169.860 5.200 -999.990 -999.990 1.699 ..P WKT 2010 12 16 21 44 55 31.3200 -97.3300 251.000 30.0 173.773 4.810 -999.990 -999.990 1.738 ..P WKT 2010 12 16 21 49 55 31.3200 -97.3300 251.000 122.0 176.324 4.720 -999.990 -999.990 1.763 ..P WKT 2010 12 16 21 54 55 31.3200 -97.3300 251.000 457.0 173.706 4.960 -999.990 -999.990 1.737 ..P WKT 2010 12 16 21 59 55 31.3200 -97.3300 251.000 30.0 170.824 5.710 -999.990 -999.990 1.708 ..P WKT 2010 12 16 22 04 55 31.3200 -97.3300 251.000 122.0 172.712 5.190 -999.990 -999.990 1.727 ..P WKT 2010 12 16 22 09 55 31.3200 -97.3300 251.000 457.0 167.182 4.960 -999.990 -999.990 1.672 ..P WKT 2010 12 16 22 19 55 31.3200 -97.3300 251.000 30.0 167.572 4.520 -999.990 -999.990 1.676 ..P WKT 2010 12 16 22 24 55 31.3200 -97.3300 251.000 122.0 167.398 5.950 -999.990 -999.990 1.674 ..P WKT 2010 12 16 22 29 55 31.3200 -97.3300 251.000 457.0 167.093 6.590 -999.990 -999.990 1.671 ..P WKT 2010 12 16 22 34 55 31.3200 -97.3300 251.000 30.0 162.552 7.560 -999.990 -999.990 1.626 ..P WKT 2010 12 16 22 39 55 31.3200 -97.3300 251.000 122.0 166.480 6.960 -999.990 -999.990 1.665 ..P WKT 2010 12 16 22 44 55 31.3200 -97.3300 251.000 457.0 161.016 5.930 -999.990 -999.990 1.610 ..P WKT 2010 12 16 22 54 55 31.3200 -97.3300 251.000 30.0 159.915 5.400 -999.990 -999.990 1.599 ..P WKT 2010 12 16 22 59 55 31.3200 -97.3300 251.000 122.0 168.904 6.770 -999.990 -999.990 1.689 ..P WKT 2010 12 16 23 04 55 31.3200 -97.3300 251.000 457.0 159.778 7.550 -999.990 -999.990 1.598 ..P WKT 2010 12 16 23 09 55 31.3200 -97.3300 251.000 30.0 175.504 7.500 -999.990 -999.990 1.755 ..P WKT 2010 12 16 23 14 55 31.3200 -97.3300 251.000 122.0 173.649 6.580 -999.990 -999.990 1.736 ..P WKT 2010 12 16 23 19 55 31.3200 -97.3300 251.000 457.0 177.608 5.180 -999.990 -999.990 1.776 ..P WKT 2010 12 16 23 29 55 31.3200 -97.3300 251.000 30.0 176.338 5.710 -999.990 -999.990 1.763 ..P WKT 2010 12 16 23 34 55 31.3200 -97.3300 251.000 122.0 174.149 6.240 -999.990 -999.990 1.741 ..P WKT 2010 12 16 23 39 55 31.3200 -97.3300 251.000 457.0 176.978 7.040 -999.990 -999.990 1.770 ..P WKT 2010 12 16 23 44 55 31.3200 -97.3300 251.000 30.0 181.917 7.260 -999.990 -999.990 1.819 ..P WKT 2010 12 16 23 49 55 31.3200 -97.3300 251.000 122.0 179.464 5.980 -999.990 -999.990 1.795 ..P WKT 2010 12 17 00 09 55 31.3200 -97.3300 251.000 457.0 164.418 6.900 -999.990 -999.990 1.644 ..P WKT 2010 12 17 00 10 25 31.3200 -97.3300 251.000 457.0 169.607 6.330 -999.990 -999.990 1.696 ..P WKT 2010 12 17 00 10 55 31.3200 -97.3300 251.000 457.0 168.728 6.310 -999.990 -999.990 1.687 ..P WKT 2010 12 17 00 11 25 31.3200 -97.3300 251.000 457.0 172.335 7.420 -999.990 -999.990 1.723 ..P WKT 2010 12 17 00 11 55 31.3200 -97.3300 251.000 457.0 176.996 6.520 -999.990 -999.990 1.770 ..P WKT 2010 12 17 00 12 25 31.3200 -97.3300 251.000 457.0 172.425 6.010 -999.990 -999.990 1.724 ..P WKT 2010 12 17 00 12 55 31.3200 -97.3300 251.000 457.0 170.755 5.910 -999.990 -999.990 1.708 ..P WKT 2010 12 17 00 13 25 31.3200 -97.3300 251.000 457.0 170.668 5.830 -999.990 -999.990 1.707 ..P WKT 2010 12 17 00 13 55 31.3200 -97.3300 251.000 457.0 175.329 6.880 -999.990 -999.990 1.753 ..P WKT 2010 12 17 00 14 25 31.3200 -97.3300 251.000 457.0 173.660 7.270 -999.990 -999.990 1.737 ..P WKT 2010 12 17 00 14 55 31.3200 -97.3300 251.000 457.0 172.254 5.960 -999.990 -999.990 1.723 ..P WKT 2010 12 17 00 19 55 31.3200 -97.3300 251.000 30.0 182.199 5.650 -999.990 -999.990 1.822 ..P WKT 2010 12 17 00 24 55 31.3200 -97.3300 251.000 122.0 176.055 5.630 -999.990 -999.990 1.761 ..P WKT 2010 12 17 00 29 55 31.3200 -97.3300 251.000 457.0 173.078 5.990 -999.990 -999.990 1.731 ..P WKT 2010 12 17 00 34 55 31.3200 -97.3300 251.000 30.0 170.628 5.610 -999.990 -999.990 1.706 ..P WKT 2010 12 17 00 39 55 31.3200 -97.3300 251.000 122.0 177.669 5.410 -999.990 -999.990 1.777 ..P WKT 2010 12 17 00 44 55 31.3200 -97.3300 251.000 457.0 166.255 6.050 -999.990 -999.990 1.663 ..P WKT 2010 12 17 00 54 55 31.3200 -97.3300 251.000 30.0 176.779 4.910 -999.990 -999.990 1.768 ..P WKT 2010 12 17 00 59 55 31.3200 -97.3300 251.000 122.0 171.301 5.330 -999.990 -999.990 1.713 ..P WKT 2010 12 17 01 04 55 31.3200 -97.3300 251.000 457.0 172.412 5.640 -999.990 -999.990 1.724 ..P WKT 2010 12 17 01 09 55 31.3200 -97.3300 251.000 30.0 179.583 5.750 -999.990 -999.990 1.796 ..P WKT 2010 12 17 01 14 55 31.3200 -97.3300 251.000 122.0 180.166 5.210 -999.990 -999.990 1.802 ..P WKT 2010 12 17 01 19 55 31.3200 -97.3300 251.000 457.0 178.904 5.770 -999.990 -999.990 1.789 ..P WKT 2010 12 17 01 29 55 31.3200 -97.3300 251.000 30.0 179.450 5.280 -999.990 -999.990 1.794 ..P WKT 2010 12 17 01 34 55 31.3200 -97.3300 251.000 122.0 185.733 5.230 -999.990 -999.990 1.857 ..P WKT 2010 12 17 01 39 55 31.3200 -97.3300 251.000 457.0 179.374 5.280 -999.990 -999.990 1.794 ..P WKT 2010 12 17 01 44 55 31.3200 -97.3300 251.000 30.0 184.602 5.440 -999.990 -999.990 1.846 ..P WKT 2010 12 17 01 49 55 31.3200 -97.3300 251.000 122.0 188.645 5.290 -999.990 -999.990 1.886 ..P WKT 2010 12 17 01 54 55 31.3200 -97.3300 251.000 457.0 189.001 6.100 -999.990 -999.990 1.890 ..P WKT 2010 12 17 02 04 55 31.3200 -97.3300 251.000 30.0 183.057 4.950 -999.990 -999.990 1.831 ..P WKT 2010 12 17 02 09 55 31.3200 -97.3300 251.000 122.0 176.232 4.750 -999.990 -999.990 1.762 ..P WKT 2010 12 17 02 14 55 31.3200 -97.3300 251.000 457.0 177.961 5.420 -999.990 -999.990 1.780 ..P WKT 2010 12 17 02 19 55 31.3200 -97.3300 251.000 30.0 177.980 5.220 -999.990 -999.990 1.780 ..P WKT 2010 12 17 02 24 55 31.3200 -97.3300 251.000 122.0 182.998 5.040 -999.990 -999.990 1.830 ..P WKT 2010 12 17 02 29 55 31.3200 -97.3300 251.000 457.0 189.200 5.540 -999.990 -999.990 1.892 ..P WKT 2010 12 17 02 39 55 31.3200 -97.3300 251.000 30.0 186.566 4.840 -999.990 -999.990 1.866 ..P WKT 2010 12 17 02 44 55 31.3200 -97.3300 251.000 122.0 187.599 5.020 -999.990 -999.990 1.876 ..P WKT 2010 12 17 02 49 55 31.3200 -97.3300 251.000 457.0 200.072 4.990 -999.990 -999.990 2.001 ..P WKT 2010 12 17 02 54 55 31.3200 -97.3300 251.000 30.0 184.271 4.860 -999.990 -999.990 1.843 ..P WKT 2010 12 17 02 59 55 31.3200 -97.3300 251.000 122.0 181.490 5.410 -999.990 -999.990 1.815 ..P WKT 2010 12 17 03 04 55 31.3200 -97.3300 251.000 457.0 176.081 5.160 -999.990 -999.990 1.761 ..P WKT 2010 12 17 03 14 55 31.3200 -97.3300 251.000 30.0 181.526 5.170 -999.990 -999.990 1.815 ..P WKT 2010 12 17 03 19 55 31.3200 -97.3300 251.000 122.0 179.367 4.870 -999.990 -999.990 1.794 ..P WKT 2010 12 17 03 24 55 31.3200 -97.3300 251.000 457.0 162.355 4.700 -999.990 -999.990 1.624 ..P WKT 2010 12 17 03 29 55 31.3200 -97.3300 251.000 30.0 188.715 6.210 -999.990 -999.990 1.887 ..P WKT 2010 12 17 03 34 55 31.3200 -97.3300 251.000 122.0 184.847 5.140 -999.990 -999.990 1.848 ..P WKT 2010 12 17 03 39 55 31.3200 -97.3300 251.000 457.0 158.905 4.510 -999.990 -999.990 1.589 ..P WKT 2010 12 17 03 49 55 31.3200 -97.3300 251.000 30.0 194.209 4.820 -999.990 -999.990 1.942 ..P WKT 2010 12 17 03 54 55 31.3200 -97.3300 251.000 122.0 193.701 5.190 -999.990 -999.990 1.937 ..P WKT 2010 12 17 03 59 55 31.3200 -97.3300 251.000 457.0 160.093 5.400 -999.990 -999.990 1.601 ..P WKT 2010 12 17 04 04 55 31.3200 -97.3300 251.000 30.0 180.076 5.140 -999.990 -999.990 1.801 ..P WKT 2010 12 17 04 09 55 31.3200 -97.3300 251.000 122.0 193.227 4.970 -999.990 -999.990 1.932 ..P WKT 2010 12 17 04 14 55 31.3200 -97.3300 251.000 457.0 147.285 5.260 -999.990 -999.990 1.473 ..P WKT 2010 12 17 04 24 55 31.3200 -97.3300 251.000 30.0 176.248 5.320 -999.990 -999.990 1.762 ..P WKT 2010 12 17 04 29 55 31.3200 -97.3300 251.000 122.0 193.896 5.610 -999.990 -999.990 1.939 ..P WKT 2010 12 17 04 34 55 31.3200 -97.3300 251.000 457.0 148.007 5.190 -999.990 -999.990 1.480 ..P WKT 2010 12 17 04 39 55 31.3200 -97.3300 251.000 30.0 184.292 4.980 -999.990 -999.990 1.843 ..P WKT 2010 12 17 04 44 55 31.3200 -97.3300 251.000 122.0 204.033 5.530 -999.990 -999.990 2.040 ..P WKT 2010 12 17 04 49 55 31.3200 -97.3300 251.000 457.0 150.545 4.840 -999.990 -999.990 1.505 ..P WKT 2010 12 17 05 04 55 31.3200 -97.3300 251.000 30.0 188.978 5.030 -999.990 -999.990 1.890 ..P WKT 2010 12 17 05 09 55 31.3200 -97.3300 251.000 122.0 191.237 5.120 -999.990 -999.990 1.912 ..P WKT 2010 12 17 05 14 55 31.3200 -97.3300 251.000 457.0 138.929 6.110 -999.990 -999.990 1.389 ..P WKT 2010 12 17 05 19 55 31.3200 -97.3300 251.000 30.0 195.493 4.890 -999.990 -999.990 1.955 ..P WKT 2010 12 17 05 24 55 31.3200 -97.3300 251.000 122.0 193.555 5.040 -999.990 -999.990 1.936 ..P WKT 2010 12 17 05 29 55 31.3200 -97.3300 251.000 457.0 140.473 4.630 -999.990 -999.990 1.405 ..P WKT 2010 12 17 05 39 55 31.3200 -97.3300 251.000 30.0 192.673 4.740 -999.990 -999.990 1.927 ..P WKT 2010 12 17 05 44 55 31.3200 -97.3300 251.000 122.0 204.190 5.090 -999.990 -999.990 2.042 ..P WKT 2010 12 17 05 49 55 31.3200 -97.3300 251.000 457.0 145.703 5.050 -999.990 -999.990 1.457 ..P WKT 2010 12 17 05 54 55 31.3200 -97.3300 251.000 30.0 200.609 5.420 -999.990 -999.990 2.006 ..P WKT 2010 12 17 05 59 55 31.3200 -97.3300 251.000 122.0 208.714 5.130 -999.990 -999.990 2.087 ..P WKT 2010 12 17 06 04 55 31.3200 -97.3300 251.000 457.0 154.436 5.540 -999.990 -999.990 1.544 ..P WKT 2010 12 17 06 14 55 31.3200 -97.3300 251.000 30.0 206.253 4.950 -999.990 -999.990 2.063 ..P WKT 2010 12 17 06 19 55 31.3200 -97.3300 251.000 122.0 220.344 5.330 -999.990 -999.990 2.203 ..P WKT 2010 12 17 06 24 55 31.3200 -97.3300 251.000 457.0 145.740 5.030 -999.990 -999.990 1.457 ..P WKT 2010 12 17 06 29 55 31.3200 -97.3300 251.000 30.0 210.268 5.960 -999.990 -999.990 2.103 ..P WKT 2010 12 17 06 34 55 31.3200 -97.3300 251.000 122.0 217.413 6.100 -999.990 -999.990 2.174 ..P WKT 2010 12 17 06 39 55 31.3200 -97.3300 251.000 457.0 146.890 6.520 -999.990 -999.990 1.469 ..P WKT 2010 12 17 06 49 55 31.3200 -97.3300 251.000 30.0 211.977 5.930 -999.990 -999.990 2.120 ..P WKT 2010 12 17 06 54 55 31.3200 -97.3300 251.000 122.0 225.647 5.770 -999.990 -999.990 2.256 ..P WKT 2010 12 17 06 59 55 31.3200 -97.3300 251.000 457.0 148.845 5.450 -999.990 -999.990 1.488 ..P WKT 2010 12 17 07 04 55 31.3200 -97.3300 251.000 30.0 215.146 5.860 -999.990 -999.990 2.151 ..P WKT 2010 12 17 07 09 55 31.3200 -97.3300 251.000 122.0 228.420 5.430 -999.990 -999.990 2.284 ..P WKT 2010 12 17 07 14 55 31.3200 -97.3300 251.000 457.0 146.402 5.030 -999.990 -999.990 1.464 ..P WKT 2010 12 17 07 24 55 31.3200 -97.3300 251.000 30.0 219.152 5.830 -999.990 -999.990 2.192 ..P WKT 2010 12 17 07 29 55 31.3200 -97.3300 251.000 122.0 216.456 5.070 -999.990 -999.990 2.165 ..P WKT 2010 12 17 07 34 55 31.3200 -97.3300 251.000 457.0 147.160 5.480 -999.990 -999.990 1.472 ..P WKT 2010 12 17 07 39 55 31.3200 -97.3300 251.000 30.0 215.906 5.280 -999.990 -999.990 2.159 ..P WKT 2010 12 17 07 44 55 31.3200 -97.3300 251.000 122.0 206.932 4.960 -999.990 -999.990 2.069 ..P WKT 2010 12 17 07 49 55 31.3200 -97.3300 251.000 457.0 151.653 4.720 -999.990 -999.990 1.517 ..P WKT 2010 12 17 07 59 55 31.3200 -97.3300 251.000 30.0 223.197 4.900 -999.990 -999.990 2.232 ..P WKT 2010 12 17 08 04 55 31.3200 -97.3300 251.000 122.0 206.136 5.150 -999.990 -999.990 2.061 ..P WKT 2010 12 17 08 09 55 31.3200 -97.3300 251.000 457.0 152.726 5.930 -999.990 -999.990 1.527 ..P WKT 2010 12 17 08 14 55 31.3200 -97.3300 251.000 30.0 219.094 7.050 -999.990 -999.990 2.191 ..P WKT 2010 12 17 08 19 55 31.3200 -97.3300 251.000 122.0 198.899 4.810 -999.990 -999.990 1.989 ..P WKT 2010 12 17 08 24 55 31.3200 -97.3300 251.000 457.0 167.466 5.170 -999.990 -999.990 1.675 ..P WKT 2010 12 17 08 34 55 31.3200 -97.3300 251.000 30.0 217.285 5.070 -999.990 -999.990 2.173 ..P WKT 2010 12 17 08 39 55 31.3200 -97.3300 251.000 122.0 202.066 5.000 -999.990 -999.990 2.021 ..P WKT 2010 12 17 08 44 55 31.3200 -97.3300 251.000 457.0 162.280 5.050 -999.990 -999.990 1.623 ..P WKT 2010 12 17 08 49 55 31.3200 -97.3300 251.000 30.0 221.549 4.990 -999.990 -999.990 2.215 ..P WKT 2010 12 17 08 54 55 31.3200 -97.3300 251.000 122.0 186.995 4.940 -999.990 -999.990 1.870 ..P WKT 2010 12 17 08 59 55 31.3200 -97.3300 251.000 457.0 160.025 5.160 -999.990 -999.990 1.600 ..P WKT 2010 12 17 09 09 55 31.3200 -97.3300 251.000 30.0 211.009 5.070 -999.990 -999.990 2.110 ..P WKT 2010 12 17 09 14 55 31.3200 -97.3300 251.000 122.0 177.661 4.840 -999.990 -999.990 1.777 ..P WKT 2010 12 17 09 19 55 31.3200 -97.3300 251.000 457.0 148.239 5.330 -999.990 -999.990 1.482 ..P WKT 2010 12 17 09 24 55 31.3200 -97.3300 251.000 30.0 207.100 5.080 -999.990 -999.990 2.071 ..P WKT 2010 12 17 09 29 55 31.3200 -97.3300 251.000 122.0 174.677 4.890 -999.990 -999.990 1.747 ..P WKT 2010 12 17 09 34 55 31.3200 -97.3300 251.000 457.0 160.669 5.840 -999.990 -999.990 1.607 ..P WKT 2010 12 17 09 44 55 31.3200 -97.3300 251.000 30.0 208.320 4.920 -999.990 -999.990 2.083 ..P WKT 2010 12 17 09 49 55 31.3200 -97.3300 251.000 122.0 186.555 5.400 -999.990 -999.990 1.866 ..P WKT 2010 12 17 09 54 55 31.3200 -97.3300 251.000 457.0 198.991 8.900 -999.990 -999.990 1.990 ..P WKT 2010 12 17 09 59 55 31.3200 -97.3300 251.000 30.0 204.638 5.000 -999.990 -999.990 2.046 ..P WKT 2010 12 17 10 04 55 31.3200 -97.3300 251.000 122.0 184.054 5.750 -999.990 -999.990 1.841 ..P WKT 2010 12 17 10 09 55 31.3200 -97.3300 251.000 457.0 171.042 5.360 -999.990 -999.990 1.710 ..P WKT 2010 12 17 10 19 55 31.3200 -97.3300 251.000 30.0 196.334 5.130 -999.990 -999.990 1.963 ..P WKT 2010 12 17 10 24 55 31.3200 -97.3300 251.000 122.0 172.404 4.930 -999.990 -999.990 1.724 ..P WKT 2010 12 17 10 29 55 31.3200 -97.3300 251.000 457.0 170.783 5.790 -999.990 -999.990 1.708 ..P WKT 2010 12 17 10 34 55 31.3200 -97.3300 251.000 30.0 190.030 5.840 -999.990 -999.990 1.900 ..P WKT 2010 12 17 10 39 55 31.3200 -97.3300 251.000 122.0 172.758 5.310 -999.990 -999.990 1.728 ..P WKT 2010 12 17 10 44 55 31.3200 -97.3300 251.000 457.0 161.358 5.420 -999.990 -999.990 1.614 ..P WKT 2010 12 17 10 54 55 31.3200 -97.3300 251.000 30.0 182.519 5.180 -999.990 -999.990 1.825 ..P WKT 2010 12 17 10 59 55 31.3200 -97.3300 251.000 122.0 168.140 5.400 -999.990 -999.990 1.681 ..P WKT 2010 12 17 11 04 55 31.3200 -97.3300 251.000 457.0 163.932 5.840 -999.990 -999.990 1.639 ..P WKT 2010 12 17 11 09 55 31.3200 -97.3300 251.000 30.0 170.152 6.910 -999.990 -999.990 1.702 ..P WKT 2010 12 17 11 14 55 31.3200 -97.3300 251.000 122.0 171.159 6.480 -999.990 -999.990 1.712 ..P WKT 2010 12 17 11 19 55 31.3200 -97.3300 251.000 457.0 181.548 5.730 -999.990 -999.990 1.815 ..P WKT 2010 12 17 11 29 55 31.3200 -97.3300 251.000 30.0 172.695 6.440 -999.990 -999.990 1.727 ..P WKT 2010 12 17 11 34 55 31.3200 -97.3300 251.000 122.0 173.915 6.670 -999.990 -999.990 1.739 ..P WKT 2010 12 17 11 39 55 31.3200 -97.3300 251.000 457.0 179.563 5.750 -999.990 -999.990 1.796 ..P WKT 2010 12 17 11 44 55 31.3200 -97.3300 251.000 30.0 172.966 6.020 -999.990 -999.990 1.730 ..P WKT 2010 12 17 11 49 55 31.3200 -97.3300 251.000 122.0 171.059 6.500 -999.990 -999.990 1.711 ..P WKT 2010 12 17 12 09 55 31.3200 -97.3300 251.000 457.0 165.250 5.410 -999.990 -999.990 1.653 ..P WKT 2010 12 17 12 10 25 31.3200 -97.3300 251.000 457.0 166.722 6.120 -999.990 -999.990 1.667 ..P WKT 2010 12 17 12 10 55 31.3200 -97.3300 251.000 457.0 176.531 5.340 -999.990 -999.990 1.765 ..P WKT 2010 12 17 12 11 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 12 17 12 11 55 31.3200 -97.3300 251.000 457.0 171.660 5.510 -999.990 -999.990 1.717 ..P WKT 2010 12 17 12 12 25 31.3200 -97.3300 251.000 457.0 171.830 5.310 -999.990 -999.990 1.718 ..P WKT 2010 12 17 12 12 55 31.3200 -97.3300 251.000 457.0 172.781 5.630 -999.990 -999.990 1.728 ..P WKT 2010 12 17 12 13 25 31.3200 -97.3300 251.000 457.0 168.782 5.580 -999.990 -999.990 1.688 ..P WKT 2010 12 17 12 13 55 31.3200 -97.3300 251.000 457.0 168.951 5.700 -999.990 -999.990 1.690 ..P WKT 2010 12 17 12 14 25 31.3200 -97.3300 251.000 457.0 169.382 5.370 -999.990 -999.990 1.694 ..P WKT 2010 12 17 12 14 55 31.3200 -97.3300 251.000 457.0 172.417 5.430 -999.990 -999.990 1.724 ..P WKT 2010 12 17 12 19 55 31.3200 -97.3300 251.000 30.0 169.945 5.900 -999.990 -999.990 1.699 ..P WKT 2010 12 17 12 24 55 31.3200 -97.3300 251.000 122.0 171.902 6.560 -999.990 -999.990 1.719 ..P WKT 2010 12 17 12 29 55 31.3200 -97.3300 251.000 457.0 167.865 5.770 -999.990 -999.990 1.679 ..P WKT 2010 12 17 12 34 55 31.3200 -97.3300 251.000 30.0 173.732 6.150 -999.990 -999.990 1.737 ..P WKT 2010 12 17 12 39 55 31.3200 -97.3300 251.000 122.0 170.215 5.250 -999.990 -999.990 1.702 ..P WKT 2010 12 17 12 44 55 31.3200 -97.3300 251.000 457.0 164.351 5.630 -999.990 -999.990 1.644 ..P WKT 2010 12 17 12 54 55 31.3200 -97.3300 251.000 30.0 172.250 6.100 -999.990 -999.990 1.723 ..P WKT 2010 12 17 12 59 55 31.3200 -97.3300 251.000 122.0 171.410 6.250 -999.990 -999.990 1.714 ..P WKT 2010 12 17 13 04 55 31.3200 -97.3300 251.000 457.0 148.653 5.540 -999.990 -999.990 1.487 ..P WKT 2010 12 17 13 09 55 31.3200 -97.3300 251.000 30.0 174.949 6.070 -999.990 -999.990 1.749 ..P WKT 2010 12 17 13 14 55 31.3200 -97.3300 251.000 122.0 173.326 5.510 -999.990 -999.990 1.733 ..P WKT 2010 12 17 13 19 55 31.3200 -97.3300 251.000 457.0 153.300 5.790 -999.990 -999.990 1.533 ..P WKT 2010 12 17 13 29 55 31.3200 -97.3300 251.000 30.0 183.635 5.810 -999.990 -999.990 1.836 ..P WKT 2010 12 17 13 34 55 31.3200 -97.3300 251.000 122.0 173.563 6.200 -999.990 -999.990 1.736 ..P WKT 2010 12 17 13 39 55 31.3200 -97.3300 251.000 457.0 160.224 6.010 -999.990 -999.990 1.602 ..P WKT 2010 12 17 13 44 55 31.3200 -97.3300 251.000 30.0 181.491 6.200 -999.990 -999.990 1.815 ..P WKT 2010 12 17 13 49 55 31.3200 -97.3300 251.000 122.0 174.810 6.060 -999.990 -999.990 1.748 ..P WKT 2010 12 17 13 54 55 31.3200 -97.3300 251.000 457.0 158.722 5.750 -999.990 -999.990 1.587 ..P WKT 2010 12 17 14 04 55 31.3200 -97.3300 251.000 30.0 181.490 6.240 -999.990 -999.990 1.815 ..P WKT 2010 12 17 14 09 55 31.3200 -97.3300 251.000 122.0 176.972 6.070 -999.990 -999.990 1.770 ..P WKT 2010 12 17 14 14 55 31.3200 -97.3300 251.000 457.0 142.258 5.540 -999.990 -999.990 1.423 ..P WKT 2010 12 17 14 19 55 31.3200 -97.3300 251.000 30.0 178.389 5.740 -999.990 -999.990 1.784 ..P WKT 2010 12 17 14 24 55 31.3200 -97.3300 251.000 122.0 178.053 5.800 -999.990 -999.990 1.781 ..P WKT 2010 12 17 14 29 55 31.3200 -97.3300 251.000 457.0 131.949 5.690 -999.990 -999.990 1.319 ..P WKT 2010 12 17 14 39 55 31.3200 -97.3300 251.000 30.0 179.471 5.880 -999.990 -999.990 1.795 ..P WKT 2010 12 17 14 44 55 31.3200 -97.3300 251.000 122.0 179.471 5.260 -999.990 -999.990 1.795 ..P WKT 2010 12 17 14 49 55 31.3200 -97.3300 251.000 457.0 132.370 5.390 -999.990 -999.990 1.324 ..P WKT 2010 12 17 14 54 55 31.3200 -97.3300 251.000 30.0 180.125 5.290 -999.990 -999.990 1.801 ..P WKT 2010 12 17 14 59 55 31.3200 -97.3300 251.000 122.0 176.591 5.270 -999.990 -999.990 1.766 ..P WKT 2010 12 17 15 04 55 31.3200 -97.3300 251.000 457.0 130.780 5.270 -999.990 -999.990 1.308 ..P WKT 2010 12 17 15 14 55 31.3200 -97.3300 251.000 30.0 177.375 5.220 -999.990 -999.990 1.774 ..P WKT 2010 12 17 15 19 55 31.3200 -97.3300 251.000 122.0 177.112 5.440 -999.990 -999.990 1.771 ..P WKT 2010 12 17 15 24 55 31.3200 -97.3300 251.000 457.0 133.895 5.160 -999.990 -999.990 1.339 ..P WKT 2010 12 17 15 29 55 31.3200 -97.3300 251.000 30.0 178.159 5.420 -999.990 -999.990 1.782 ..P WKT 2010 12 17 15 34 55 31.3200 -97.3300 251.000 122.0 173.442 5.980 -999.990 -999.990 1.734 ..P WKT 2010 12 17 15 39 55 31.3200 -97.3300 251.000 457.0 146.190 5.260 -999.990 -999.990 1.462 ..P WKT 2010 12 17 15 49 55 31.3200 -97.3300 251.000 30.0 185.551 5.430 -999.990 -999.990 1.856 ..P WKT 2010 12 17 15 54 55 31.3200 -97.3300 251.000 122.0 188.229 6.010 -999.990 -999.990 1.882 ..P WKT 2010 12 17 15 59 55 31.3200 -97.3300 251.000 457.0 145.815 6.370 -999.990 -999.990 1.458 ..P WKT 2010 12 17 16 04 55 31.3200 -97.3300 251.000 30.0 193.850 6.690 -999.990 -999.990 1.938 ..P WKT 2010 12 17 16 09 55 31.3200 -97.3300 251.000 122.0 192.596 6.800 -999.990 -999.990 1.926 ..P WKT 2010 12 17 16 14 55 31.3200 -97.3300 251.000 457.0 146.493 6.250 -999.990 -999.990 1.465 ..P WKT 2010 12 17 16 24 55 31.3200 -97.3300 251.000 30.0 178.640 5.660 -999.990 -999.990 1.786 ..P WKT 2010 12 17 16 29 55 31.3200 -97.3300 251.000 122.0 181.095 6.370 -999.990 -999.990 1.811 ..P WKT 2010 12 17 16 34 55 31.3200 -97.3300 251.000 457.0 143.399 6.540 -999.990 -999.990 1.434 ..P WKT 2010 12 17 16 39 55 31.3200 -97.3300 251.000 30.0 173.146 6.610 -999.990 -999.990 1.731 ..P WKT 2010 12 17 16 44 55 31.3200 -97.3300 251.000 122.0 170.088 6.920 -999.990 -999.990 1.701 ..P WKT 2010 12 17 16 49 55 31.3200 -97.3300 251.000 457.0 158.367 7.160 -999.990 -999.990 1.584 ..P WKT 2010 12 17 17 04 55 31.3200 -97.3300 251.000 30.0 167.089 6.670 -999.990 -999.990 1.671 ..P WKT 2010 12 17 17 09 55 31.3200 -97.3300 251.000 122.0 168.781 6.420 -999.990 -999.990 1.688 ..P WKT 2010 12 17 17 14 55 31.3200 -97.3300 251.000 457.0 163.379 6.690 -999.990 -999.990 1.634 ..P WKT 2010 12 17 17 19 55 31.3200 -97.3300 251.000 30.0 164.808 5.870 -999.990 -999.990 1.648 ..P WKT 2010 12 17 17 24 55 31.3200 -97.3300 251.000 122.0 166.368 6.490 -999.990 -999.990 1.664 ..P WKT 2010 12 17 17 29 55 31.3200 -97.3300 251.000 457.0 166.877 5.520 -999.990 -999.990 1.669 ..P WKT 2010 12 17 17 39 55 31.3200 -97.3300 251.000 30.0 163.779 5.430 -999.990 -999.990 1.638 ..P WKT 2010 12 17 17 44 55 31.3200 -97.3300 251.000 122.0 170.426 6.190 -999.990 -999.990 1.704 ..P WKT 2010 12 17 17 49 55 31.3200 -97.3300 251.000 457.0 165.240 5.540 -999.990 -999.990 1.652 ..P WKT 2010 12 17 17 54 55 31.3200 -97.3300 251.000 30.0 165.575 5.870 -999.990 -999.990 1.656 ..P WKT 2010 12 17 17 59 55 31.3200 -97.3300 251.000 122.0 167.490 5.760 -999.990 -999.990 1.675 ..P WKT 2010 12 17 18 04 55 31.3200 -97.3300 251.000 457.0 166.510 6.810 -999.990 -999.990 1.665 ..P WKT 2010 12 17 18 14 55 31.3200 -97.3300 251.000 30.0 166.750 5.880 -999.990 -999.990 1.667 ..P WKT 2010 12 17 18 19 55 31.3200 -97.3300 251.000 122.0 162.312 6.190 -999.990 -999.990 1.623 ..P WKT 2010 12 17 18 24 55 31.3200 -97.3300 251.000 457.0 162.216 5.810 -999.990 -999.990 1.622 ..P WKT 2010 12 17 18 29 55 31.3200 -97.3300 251.000 30.0 163.698 5.600 -999.990 -999.990 1.637 ..P WKT 2010 12 17 18 34 55 31.3200 -97.3300 251.000 122.0 167.946 5.900 -999.990 -999.990 1.679 ..P WKT 2010 12 17 18 39 55 31.3200 -97.3300 251.000 457.0 166.665 6.560 -999.990 -999.990 1.667 ..P WKT 2010 12 17 18 49 55 31.3200 -97.3300 251.000 30.0 175.409 5.730 -999.990 -999.990 1.754 ..P WKT 2010 12 17 18 54 55 31.3200 -97.3300 251.000 122.0 174.109 5.520 -999.990 -999.990 1.741 ..P WKT 2010 12 17 18 59 55 31.3200 -97.3300 251.000 457.0 174.786 5.560 -999.990 -999.990 1.748 ..P WKT 2010 12 17 19 04 55 31.3200 -97.3300 251.000 30.0 171.773 5.520 -999.990 -999.990 1.718 ..P WKT 2010 12 17 19 09 55 31.3200 -97.3300 251.000 122.0 169.288 5.650 -999.990 -999.990 1.693 ..P WKT 2010 12 17 19 14 55 31.3200 -97.3300 251.000 457.0 165.746 5.670 -999.990 -999.990 1.657 ..P WKT 2010 12 17 19 24 55 31.3200 -97.3300 251.000 30.0 172.182 6.690 -999.990 -999.990 1.722 ..P WKT 2010 12 17 19 29 55 31.3200 -97.3300 251.000 122.0 169.110 5.840 -999.990 -999.990 1.691 ..P WKT 2010 12 17 19 34 55 31.3200 -97.3300 251.000 457.0 173.423 5.820 -999.990 -999.990 1.734 ..P WKT 2010 12 17 19 39 55 31.3200 -97.3300 251.000 30.0 175.098 5.860 -999.990 -999.990 1.751 ..P WKT 2010 12 17 19 44 55 31.3200 -97.3300 251.000 122.0 168.333 6.090 -999.990 -999.990 1.683 ..P WKT 2010 12 17 19 49 55 31.3200 -97.3300 251.000 457.0 181.616 5.950 -999.990 -999.990 1.816 ..P WKT 2010 12 17 19 59 55 31.3200 -97.3300 251.000 30.0 174.717 6.280 -999.990 -999.990 1.747 ..P WKT 2010 12 17 20 04 55 31.3200 -97.3300 251.000 122.0 168.250 5.850 -999.990 -999.990 1.683 ..P WKT 2010 12 17 20 09 55 31.3200 -97.3300 251.000 457.0 174.979 6.000 -999.990 -999.990 1.750 ..P WKT 2010 12 17 20 14 55 31.3200 -97.3300 251.000 30.0 175.374 5.880 -999.990 -999.990 1.754 ..P WKT 2010 12 17 20 19 55 31.3200 -97.3300 251.000 122.0 176.562 5.810 -999.990 -999.990 1.766 ..P WKT 2010 12 17 20 24 55 31.3200 -97.3300 251.000 457.0 167.978 5.810 -999.990 -999.990 1.680 ..P WKT 2010 12 17 20 34 55 31.3200 -97.3300 251.000 30.0 168.918 5.770 -999.990 -999.990 1.689 ..P WKT 2010 12 17 20 39 55 31.3200 -97.3300 251.000 122.0 175.539 5.770 -999.990 -999.990 1.755 ..P WKT 2010 12 17 20 44 55 31.3200 -97.3300 251.000 457.0 174.500 6.100 -999.990 -999.990 1.745 ..P WKT 2010 12 17 20 49 55 31.3200 -97.3300 251.000 30.0 166.854 6.070 -999.990 -999.990 1.669 ..P WKT 2010 12 17 20 54 55 31.3200 -97.3300 251.000 122.0 169.779 5.870 -999.990 -999.990 1.698 ..P WKT 2010 12 17 20 59 55 31.3200 -97.3300 251.000 457.0 166.359 5.750 -999.990 -999.990 1.664 ..P WKT 2010 12 17 21 09 55 31.3200 -97.3300 251.000 30.0 166.695 5.730 -999.990 -999.990 1.667 ..P WKT 2010 12 17 21 14 55 31.3200 -97.3300 251.000 122.0 161.725 6.130 -999.990 -999.990 1.617 ..P WKT 2010 12 17 21 19 55 31.3200 -97.3300 251.000 457.0 158.605 6.240 -999.990 -999.990 1.586 ..P WKT 2010 12 17 21 24 55 31.3200 -97.3300 251.000 30.0 165.933 5.870 -999.990 -999.990 1.659 ..P WKT 2010 12 17 21 29 55 31.3200 -97.3300 251.000 122.0 168.765 5.940 -999.990 -999.990 1.688 ..P WKT 2010 12 17 21 34 55 31.3200 -97.3300 251.000 457.0 173.979 5.980 -999.990 -999.990 1.740 ..P WKT 2010 12 17 21 44 55 31.3200 -97.3300 251.000 30.0 166.661 6.210 -999.990 -999.990 1.667 ..P WKT 2010 12 17 21 49 55 31.3200 -97.3300 251.000 122.0 171.329 5.870 -999.990 -999.990 1.713 ..P WKT 2010 12 17 21 54 55 31.3200 -97.3300 251.000 457.0 168.453 6.690 -999.990 -999.990 1.685 ..P WKT 2010 12 17 21 59 55 31.3200 -97.3300 251.000 30.0 168.092 9.120 -999.990 -999.990 1.681 ..P WKT 2010 12 17 22 04 55 31.3200 -97.3300 251.000 122.0 168.260 6.980 -999.990 -999.990 1.683 ..P WKT 2010 12 17 22 09 55 31.3200 -97.3300 251.000 457.0 159.689 6.400 -999.990 -999.990 1.597 ..P WKT 2010 12 17 22 19 55 31.3200 -97.3300 251.000 30.0 168.444 6.490 -999.990 -999.990 1.684 ..P WKT 2010 12 17 22 24 55 31.3200 -97.3300 251.000 122.0 162.727 7.130 -999.990 -999.990 1.627 ..P WKT 2010 12 17 22 29 55 31.3200 -97.3300 251.000 457.0 163.500 7.760 -999.990 -999.990 1.635 ..P WKT 2010 12 17 22 34 55 31.3200 -97.3300 251.000 30.0 166.659 8.030 -999.990 -999.990 1.667 ..P WKT 2010 12 17 22 39 55 31.3200 -97.3300 251.000 122.0 161.867 7.310 -999.990 -999.990 1.619 ..P WKT 2010 12 17 22 44 55 31.3200 -97.3300 251.000 457.0 152.434 6.230 -999.990 -999.990 1.524 ..P WKT 2010 12 17 22 54 55 31.3200 -97.3300 251.000 30.0 161.043 6.250 -999.990 -999.990 1.610 ..P WKT 2010 12 17 22 59 55 31.3200 -97.3300 251.000 122.0 161.325 7.230 -999.990 -999.990 1.613 ..P WKT 2010 12 17 23 04 55 31.3200 -97.3300 251.000 457.0 157.230 8.270 -999.990 -999.990 1.572 ..P WKT 2010 12 17 23 09 55 31.3200 -97.3300 251.000 30.0 165.469 7.330 -999.990 -999.990 1.655 ..P WKT 2010 12 17 23 14 55 31.3200 -97.3300 251.000 122.0 164.159 6.810 -999.990 -999.990 1.642 ..P WKT 2010 12 17 23 19 55 31.3200 -97.3300 251.000 457.0 166.564 5.770 -999.990 -999.990 1.666 ..P WKT 2010 12 17 23 29 55 31.3200 -97.3300 251.000 30.0 165.735 6.360 -999.990 -999.990 1.657 ..P WKT 2010 12 17 23 34 55 31.3200 -97.3300 251.000 122.0 172.587 6.540 -999.990 -999.990 1.726 ..P WKT 2010 12 17 23 39 55 31.3200 -97.3300 251.000 457.0 166.166 6.610 -999.990 -999.990 1.662 ..P WKT 2010 12 17 23 44 55 31.3200 -97.3300 251.000 30.0 172.490 6.300 -999.990 -999.990 1.725 ..P WKT 2010 12 17 23 49 55 31.3200 -97.3300 251.000 122.0 178.549 6.210 -999.990 -999.990 1.785 ..P WKT 2010 12 18 00 09 55 31.3200 -97.3300 251.000 457.0 169.163 7.150 -999.990 -999.990 1.692 ..P WKT 2010 12 18 00 10 25 31.3200 -97.3300 251.000 457.0 174.906 6.250 -999.990 -999.990 1.749 ..P WKT 2010 12 18 00 10 55 31.3200 -97.3300 251.000 457.0 173.211 6.630 -999.990 -999.990 1.732 ..P WKT 2010 12 18 00 11 25 31.3200 -97.3300 251.000 457.0 170.983 6.230 -999.990 -999.990 1.710 ..P WKT 2010 12 18 00 11 55 31.3200 -97.3300 251.000 457.0 173.539 6.280 -999.990 -999.990 1.735 ..P WKT 2010 12 18 00 12 25 31.3200 -97.3300 251.000 457.0 172.374 6.140 -999.990 -999.990 1.724 ..P WKT 2010 12 18 00 12 55 31.3200 -97.3300 251.000 457.0 171.742 6.160 -999.990 -999.990 1.717 ..P WKT 2010 12 18 00 13 25 31.3200 -97.3300 251.000 457.0 171.374 6.930 -999.990 -999.990 1.714 ..P WKT 2010 12 18 00 13 55 31.3200 -97.3300 251.000 457.0 168.351 6.330 -999.990 -999.990 1.684 ..P WKT 2010 12 18 00 14 25 31.3200 -97.3300 251.000 457.0 173.828 6.140 -999.990 -999.990 1.738 ..P WKT 2010 12 18 00 14 55 31.3200 -97.3300 251.000 457.0 172.133 6.220 -999.990 -999.990 1.721 ..P WKT 2010 12 18 00 19 55 31.3200 -97.3300 251.000 30.0 172.711 6.110 -999.990 -999.990 1.727 ..P WKT 2010 12 18 00 24 55 31.3200 -97.3300 251.000 122.0 186.043 6.440 -999.990 -999.990 1.860 ..P WKT 2010 12 18 00 29 55 31.3200 -97.3300 251.000 457.0 172.539 6.610 -999.990 -999.990 1.725 ..P WKT 2010 12 18 00 34 55 31.3200 -97.3300 251.000 30.0 183.215 6.210 -999.990 -999.990 1.832 ..P WKT 2010 12 18 00 39 55 31.3200 -97.3300 251.000 122.0 183.528 6.380 -999.990 -999.990 1.835 ..P WKT 2010 12 18 00 44 55 31.3200 -97.3300 251.000 457.0 171.350 5.760 -999.990 -999.990 1.714 ..P WKT 2010 12 18 00 54 55 31.3200 -97.3300 251.000 30.0 184.020 6.590 -999.990 -999.990 1.840 ..P WKT 2010 12 18 00 59 55 31.3200 -97.3300 251.000 122.0 190.797 5.920 -999.990 -999.990 1.908 ..P WKT 2010 12 18 01 04 55 31.3200 -97.3300 251.000 457.0 165.677 6.090 -999.990 -999.990 1.657 ..P WKT 2010 12 18 01 09 55 31.3200 -97.3300 251.000 30.0 181.225 5.790 -999.990 -999.990 1.812 ..P WKT 2010 12 18 01 14 55 31.3200 -97.3300 251.000 122.0 188.534 6.470 -999.990 -999.990 1.885 ..P WKT 2010 12 18 01 19 55 31.3200 -97.3300 251.000 457.0 164.741 6.850 -999.990 -999.990 1.647 ..P WKT 2010 12 18 01 29 55 31.3200 -97.3300 251.000 30.0 176.549 5.960 -999.990 -999.990 1.765 ..P WKT 2010 12 18 01 34 55 31.3200 -97.3300 251.000 122.0 174.003 6.440 -999.990 -999.990 1.740 ..P WKT 2010 12 18 01 39 55 31.3200 -97.3300 251.000 457.0 169.329 5.890 -999.990 -999.990 1.693 ..P WKT 2010 12 18 01 44 55 31.3200 -97.3300 251.000 30.0 169.309 6.850 -999.990 -999.990 1.693 ..P WKT 2010 12 18 01 49 55 31.3200 -97.3300 251.000 122.0 173.675 6.560 -999.990 -999.990 1.737 ..P WKT 2010 12 18 01 54 55 31.3200 -97.3300 251.000 457.0 159.827 6.100 -999.990 -999.990 1.598 ..P WKT 2010 12 18 02 04 55 31.3200 -97.3300 251.000 30.0 164.229 6.460 -999.990 -999.990 1.642 ..P WKT 2010 12 18 02 09 55 31.3200 -97.3300 251.000 122.0 161.738 6.330 -999.990 -999.990 1.617 ..P WKT 2010 12 18 02 14 55 31.3200 -97.3300 251.000 457.0 164.301 5.820 -999.990 -999.990 1.643 ..P WKT 2010 12 18 02 19 55 31.3200 -97.3300 251.000 30.0 164.736 5.800 -999.990 -999.990 1.647 ..P WKT 2010 12 18 02 24 55 31.3200 -97.3300 251.000 122.0 165.969 5.770 -999.990 -999.990 1.660 ..P WKT 2010 12 18 02 29 55 31.3200 -97.3300 251.000 457.0 169.463 5.830 -999.990 -999.990 1.695 ..P WKT 2010 12 18 02 39 55 31.3200 -97.3300 251.000 30.0 167.008 5.660 -999.990 -999.990 1.670 ..P WKT 2010 12 18 02 44 55 31.3200 -97.3300 251.000 122.0 174.227 6.070 -999.990 -999.990 1.742 ..P WKT 2010 12 18 02 49 55 31.3200 -97.3300 251.000 457.0 173.199 5.850 -999.990 -999.990 1.732 ..P WKT 2010 12 18 02 54 55 31.3200 -97.3300 251.000 30.0 170.575 5.880 -999.990 -999.990 1.706 ..P WKT 2010 12 18 02 59 55 31.3200 -97.3300 251.000 122.0 175.667 6.310 -999.990 -999.990 1.757 ..P WKT 2010 12 18 03 04 55 31.3200 -97.3300 251.000 457.0 164.926 5.920 -999.990 -999.990 1.649 ..P WKT 2010 12 18 03 14 55 31.3200 -97.3300 251.000 30.0 166.956 6.370 -999.990 -999.990 1.670 ..P WKT 2010 12 18 03 19 55 31.3200 -97.3300 251.000 122.0 164.161 5.960 -999.990 -999.990 1.642 ..P WKT 2010 12 18 03 24 55 31.3200 -97.3300 251.000 457.0 166.687 6.070 -999.990 -999.990 1.667 ..P WKT 2010 12 18 03 29 55 31.3200 -97.3300 251.000 30.0 166.285 5.960 -999.990 -999.990 1.663 ..P WKT 2010 12 18 03 34 55 31.3200 -97.3300 251.000 122.0 161.892 6.050 -999.990 -999.990 1.619 ..P WKT 2010 12 18 03 39 55 31.3200 -97.3300 251.000 457.0 161.491 6.600 -999.990 -999.990 1.615 ..P WKT 2010 12 18 03 49 55 31.3200 -97.3300 251.000 30.0 160.953 5.850 -999.990 -999.990 1.610 ..P WKT 2010 12 18 03 54 55 31.3200 -97.3300 251.000 122.0 162.149 6.030 -999.990 -999.990 1.621 ..P WKT 2010 12 18 03 59 55 31.3200 -97.3300 251.000 457.0 156.424 5.860 -999.990 -999.990 1.564 ..P WKT 2010 12 18 04 04 55 31.3200 -97.3300 251.000 30.0 161.346 5.810 -999.990 -999.990 1.613 ..P WKT 2010 12 18 04 09 55 31.3200 -97.3300 251.000 122.0 164.672 6.140 -999.990 -999.990 1.647 ..P WKT 2010 12 18 04 14 55 31.3200 -97.3300 251.000 457.0 157.082 5.870 -999.990 -999.990 1.571 ..P WKT 2010 12 18 04 24 55 31.3200 -97.3300 251.000 30.0 159.245 5.930 -999.990 -999.990 1.592 ..P WKT 2010 12 18 04 29 55 31.3200 -97.3300 251.000 122.0 161.811 6.090 -999.990 -999.990 1.618 ..P WKT 2010 12 18 04 34 55 31.3200 -97.3300 251.000 457.0 156.121 5.560 -999.990 -999.990 1.561 ..P WKT 2010 12 18 04 39 55 31.3200 -97.3300 251.000 30.0 164.013 5.570 -999.990 -999.990 1.640 ..P WKT 2010 12 18 04 44 55 31.3200 -97.3300 251.000 122.0 167.378 5.820 -999.990 -999.990 1.674 ..P WKT 2010 12 18 04 49 55 31.3200 -97.3300 251.000 457.0 156.894 6.200 -999.990 -999.990 1.569 ..P WKT 2010 12 18 05 04 55 31.3200 -97.3300 251.000 30.0 177.141 5.590 -999.990 -999.990 1.771 ..P WKT 2010 12 18 05 09 55 31.3200 -97.3300 251.000 122.0 177.791 5.850 -999.990 -999.990 1.778 ..P WKT 2010 12 18 05 14 55 31.3200 -97.3300 251.000 457.0 147.140 5.740 -999.990 -999.990 1.471 ..P WKT 2010 12 18 05 19 55 31.3200 -97.3300 251.000 30.0 181.222 5.810 -999.990 -999.990 1.812 ..P WKT 2010 12 18 05 24 55 31.3200 -97.3300 251.000 122.0 171.483 5.880 -999.990 -999.990 1.715 ..P WKT 2010 12 18 05 29 55 31.3200 -97.3300 251.000 457.0 155.481 6.180 -999.990 -999.990 1.555 ..P WKT 2010 12 18 05 39 55 31.3200 -97.3300 251.000 30.0 184.619 6.240 -999.990 -999.990 1.846 ..P WKT 2010 12 18 05 44 55 31.3200 -97.3300 251.000 122.0 187.531 6.440 -999.990 -999.990 1.875 ..P WKT 2010 12 18 05 49 55 31.3200 -97.3300 251.000 457.0 153.134 5.670 -999.990 -999.990 1.531 ..P WKT 2010 12 18 05 54 55 31.3200 -97.3300 251.000 30.0 187.756 5.460 -999.990 -999.990 1.878 ..P WKT 2010 12 18 05 59 55 31.3200 -97.3300 251.000 122.0 193.333 6.150 -999.990 -999.990 1.933 ..P WKT 2010 12 18 06 04 55 31.3200 -97.3300 251.000 457.0 156.401 5.620 -999.990 -999.990 1.564 ..P WKT 2010 12 18 06 14 55 31.3200 -97.3300 251.000 30.0 177.168 5.340 -999.990 -999.990 1.772 ..P WKT 2010 12 18 06 19 55 31.3200 -97.3300 251.000 122.0 193.292 5.250 -999.990 -999.990 1.933 ..P WKT 2010 12 18 06 24 55 31.3200 -97.3300 251.000 457.0 153.840 6.350 -999.990 -999.990 1.538 ..P WKT 2010 12 18 06 29 55 31.3200 -97.3300 251.000 30.0 181.428 5.260 -999.990 -999.990 1.814 ..P WKT 2010 12 18 06 34 55 31.3200 -97.3300 251.000 122.0 193.423 5.250 -999.990 -999.990 1.934 ..P WKT 2010 12 18 06 39 55 31.3200 -97.3300 251.000 457.0 159.165 5.430 -999.990 -999.990 1.592 ..P WKT 2010 12 18 06 49 55 31.3200 -97.3300 251.000 30.0 175.271 5.250 -999.990 -999.990 1.753 ..P WKT 2010 12 18 06 54 55 31.3200 -97.3300 251.000 122.0 181.383 5.410 -999.990 -999.990 1.814 ..P WKT 2010 12 18 06 59 55 31.3200 -97.3300 251.000 457.0 158.699 5.270 -999.990 -999.990 1.587 ..P WKT 2010 12 18 07 04 55 31.3200 -97.3300 251.000 30.0 173.877 5.370 -999.990 -999.990 1.739 ..P WKT 2010 12 18 07 09 55 31.3200 -97.3300 251.000 122.0 173.589 5.280 -999.990 -999.990 1.736 ..P WKT 2010 12 18 07 14 55 31.3200 -97.3300 251.000 457.0 146.901 5.570 -999.990 -999.990 1.469 ..P WKT 2010 12 18 07 24 55 31.3200 -97.3300 251.000 30.0 166.136 5.410 -999.990 -999.990 1.661 ..P WKT 2010 12 18 07 29 55 31.3200 -97.3300 251.000 122.0 173.392 5.480 -999.990 -999.990 1.734 ..P WKT 2010 12 18 07 34 55 31.3200 -97.3300 251.000 457.0 145.442 6.240 -999.990 -999.990 1.454 ..P WKT 2010 12 18 07 39 55 31.3200 -97.3300 251.000 30.0 161.233 5.750 -999.990 -999.990 1.612 ..P WKT 2010 12 18 07 44 55 31.3200 -97.3300 251.000 122.0 178.627 5.860 -999.990 -999.990 1.786 ..P WKT 2010 12 18 07 49 55 31.3200 -97.3300 251.000 457.0 157.075 5.590 -999.990 -999.990 1.571 ..P WKT 2010 12 18 07 59 55 31.3200 -97.3300 251.000 30.0 169.266 5.520 -999.990 -999.990 1.693 ..P WKT 2010 12 18 08 04 55 31.3200 -97.3300 251.000 122.0 170.465 5.270 -999.990 -999.990 1.705 ..P WKT 2010 12 18 08 09 55 31.3200 -97.3300 251.000 457.0 166.061 5.670 -999.990 -999.990 1.661 ..P WKT 2010 12 18 08 14 55 31.3200 -97.3300 251.000 30.0 166.193 5.240 -999.990 -999.990 1.662 ..P WKT 2010 12 18 08 19 55 31.3200 -97.3300 251.000 122.0 159.653 5.200 -999.990 -999.990 1.597 ..P WKT 2010 12 18 08 24 55 31.3200 -97.3300 251.000 457.0 160.852 4.950 -999.990 -999.990 1.609 ..P WKT 2010 12 18 08 34 55 31.3200 -97.3300 251.000 30.0 173.714 6.650 -999.990 -999.990 1.737 ..P WKT 2010 12 18 08 39 55 31.3200 -97.3300 251.000 122.0 171.768 5.210 -999.990 -999.990 1.718 ..P WKT 2010 12 18 08 44 55 31.3200 -97.3300 251.000 457.0 158.879 5.540 -999.990 -999.990 1.589 ..P WKT 2010 12 18 08 49 55 31.3200 -97.3300 251.000 30.0 164.138 5.190 -999.990 -999.990 1.641 ..P WKT 2010 12 18 08 54 55 31.3200 -97.3300 251.000 122.0 172.068 4.990 -999.990 -999.990 1.721 ..P WKT 2010 12 18 08 59 55 31.3200 -97.3300 251.000 457.0 167.451 5.720 -999.990 -999.990 1.675 ..P WKT 2010 12 18 09 09 55 31.3200 -97.3300 251.000 30.0 172.368 4.890 -999.990 -999.990 1.724 ..P WKT 2010 12 18 09 14 55 31.3200 -97.3300 251.000 122.0 172.557 5.560 -999.990 -999.990 1.726 ..P WKT 2010 12 18 09 19 55 31.3200 -97.3300 251.000 457.0 166.872 5.000 -999.990 -999.990 1.669 ..P WKT 2010 12 18 09 24 55 31.3200 -97.3300 251.000 30.0 166.126 4.840 -999.990 -999.990 1.661 ..P WKT 2010 12 18 09 29 55 31.3200 -97.3300 251.000 122.0 170.320 5.000 -999.990 -999.990 1.703 ..P WKT 2010 12 18 09 34 55 31.3200 -97.3300 251.000 457.0 167.305 5.050 -999.990 -999.990 1.673 ..P WKT 2010 12 18 09 44 55 31.3200 -97.3300 251.000 30.0 170.505 5.220 -999.990 -999.990 1.705 ..P WKT 2010 12 18 09 49 55 31.3200 -97.3300 251.000 122.0 179.258 5.320 -999.990 -999.990 1.793 ..P WKT 2010 12 18 09 54 55 31.3200 -97.3300 251.000 457.0 178.799 5.260 -999.990 -999.990 1.788 ..P WKT 2010 12 18 09 59 55 31.3200 -97.3300 251.000 30.0 175.135 5.750 -999.990 -999.990 1.751 ..P WKT 2010 12 18 10 04 55 31.3200 -97.3300 251.000 122.0 179.483 6.040 -999.990 -999.990 1.795 ..P WKT 2010 12 18 10 09 55 31.3200 -97.3300 251.000 457.0 183.164 5.590 -999.990 -999.990 1.832 ..P WKT 2010 12 18 10 19 55 31.3200 -97.3300 251.000 30.0 175.319 5.500 -999.990 -999.990 1.753 ..P WKT 2010 12 18 10 24 55 31.3200 -97.3300 251.000 122.0 166.331 5.350 -999.990 -999.990 1.663 ..P WKT 2010 12 18 10 29 55 31.3200 -97.3300 251.000 457.0 177.778 6.030 -999.990 -999.990 1.778 ..P WKT 2010 12 18 10 34 55 31.3200 -97.3300 251.000 30.0 167.987 5.400 -999.990 -999.990 1.680 ..P WKT 2010 12 18 10 39 55 31.3200 -97.3300 251.000 122.0 158.997 5.560 -999.990 -999.990 1.590 ..P WKT 2010 12 18 10 44 55 31.3200 -97.3300 251.000 457.0 172.716 5.350 -999.990 -999.990 1.727 ..P WKT 2010 12 18 10 54 55 31.3200 -97.3300 251.000 30.0 164.029 4.850 -999.990 -999.990 1.640 ..P WKT 2010 12 18 10 59 55 31.3200 -97.3300 251.000 122.0 155.114 5.100 -999.990 -999.990 1.551 ..P WKT 2010 12 18 11 04 55 31.3200 -97.3300 251.000 457.0 174.790 5.400 -999.990 -999.990 1.748 ..P WKT 2010 12 18 11 09 55 31.3200 -97.3300 251.000 30.0 164.539 5.030 -999.990 -999.990 1.645 ..P WKT 2010 12 18 11 14 55 31.3200 -97.3300 251.000 122.0 151.346 4.790 -999.990 -999.990 1.513 ..P WKT 2010 12 18 11 19 55 31.3200 -97.3300 251.000 457.0 166.481 5.070 -999.990 -999.990 1.665 ..P WKT 2010 12 18 11 29 55 31.3200 -97.3300 251.000 30.0 170.578 5.410 -999.990 -999.990 1.706 ..P WKT 2010 12 18 11 34 55 31.3200 -97.3300 251.000 122.0 144.300 5.210 -999.990 -999.990 1.443 ..P WKT 2010 12 18 11 39 55 31.3200 -97.3300 251.000 457.0 162.393 4.990 -999.990 -999.990 1.624 ..P WKT 2010 12 18 11 44 55 31.3200 -97.3300 251.000 30.0 163.378 5.330 -999.990 -999.990 1.634 ..P WKT 2010 12 18 11 49 55 31.3200 -97.3300 251.000 122.0 150.197 5.400 -999.990 -999.990 1.502 ..P WKT 2010 12 18 12 09 55 31.3200 -97.3300 251.000 457.0 171.719 5.580 -999.990 -999.990 1.717 ..P WKT 2010 12 18 12 10 25 31.3200 -97.3300 251.000 457.0 163.905 6.150 -999.990 -999.990 1.639 ..P WKT 2010 12 18 12 10 55 31.3200 -97.3300 251.000 457.0 162.773 6.300 -999.990 -999.990 1.628 ..P WKT 2010 12 18 12 11 25 31.3200 -97.3300 251.000 457.0 176.074 5.890 -999.990 -999.990 1.761 ..P WKT 2010 12 18 12 11 55 31.3200 -97.3300 251.000 457.0 181.624 5.970 -999.990 -999.990 1.816 ..P WKT 2010 12 18 12 12 25 31.3200 -97.3300 251.000 457.0 188.511 5.620 -999.990 -999.990 1.885 ..P WKT 2010 12 18 12 12 55 31.3200 -97.3300 251.000 457.0 193.259 5.670 -999.990 -999.990 1.933 ..P WKT 2010 12 18 12 13 25 31.3200 -97.3300 251.000 457.0 189.989 5.800 -999.990 -999.990 1.900 ..P WKT 2010 12 18 12 13 55 31.3200 -97.3300 251.000 457.0 188.857 6.450 -999.990 -999.990 1.889 ..P WKT 2010 12 18 12 14 25 31.3200 -97.3300 251.000 457.0 185.853 6.310 -999.990 -999.990 1.859 ..P WKT 2010 12 18 12 14 55 31.3200 -97.3300 251.000 457.0 188.463 6.040 -999.990 -999.990 1.885 ..P WKT 2010 12 18 12 19 55 31.3200 -97.3300 251.000 30.0 157.365 5.450 -999.990 -999.990 1.574 ..P WKT 2010 12 18 12 24 55 31.3200 -97.3300 251.000 122.0 145.246 5.600 -999.990 -999.990 1.452 ..P WKT 2010 12 18 12 29 55 31.3200 -97.3300 251.000 457.0 191.916 6.410 -999.990 -999.990 1.919 ..P WKT 2010 12 18 12 34 55 31.3200 -97.3300 251.000 30.0 157.353 7.130 -999.990 -999.990 1.574 ..P WKT 2010 12 18 12 39 55 31.3200 -97.3300 251.000 122.0 142.565 5.060 -999.990 -999.990 1.426 ..P WKT 2010 12 18 12 44 55 31.3200 -97.3300 251.000 457.0 149.152 5.200 -999.990 -999.990 1.492 ..P WKT 2010 12 18 12 54 55 31.3200 -97.3300 251.000 30.0 156.519 5.000 -999.990 -999.990 1.565 ..P WKT 2010 12 18 12 59 55 31.3200 -97.3300 251.000 122.0 147.286 5.100 -999.990 -999.990 1.473 ..P WKT 2010 12 18 13 04 55 31.3200 -97.3300 251.000 457.0 140.459 5.050 -999.990 -999.990 1.405 ..P WKT 2010 12 18 13 09 55 31.3200 -97.3300 251.000 30.0 156.462 5.220 -999.990 -999.990 1.565 ..P WKT 2010 12 18 13 14 55 31.3200 -97.3300 251.000 122.0 146.831 5.520 -999.990 -999.990 1.468 ..P WKT 2010 12 18 13 19 55 31.3200 -97.3300 251.000 457.0 141.207 5.190 -999.990 -999.990 1.412 ..P WKT 2010 12 18 13 29 55 31.3200 -97.3300 251.000 30.0 161.457 5.340 -999.990 -999.990 1.615 ..P WKT 2010 12 18 13 34 55 31.3200 -97.3300 251.000 122.0 146.758 4.840 -999.990 -999.990 1.468 ..P WKT 2010 12 18 13 39 55 31.3200 -97.3300 251.000 457.0 139.134 4.950 -999.990 -999.990 1.391 ..P WKT 2010 12 18 13 44 55 31.3200 -97.3300 251.000 30.0 157.396 4.880 -999.990 -999.990 1.574 ..P WKT 2010 12 18 13 49 55 31.3200 -97.3300 251.000 122.0 150.439 4.850 -999.990 -999.990 1.504 ..P WKT 2010 12 18 13 54 55 31.3200 -97.3300 251.000 457.0 143.350 4.730 -999.990 -999.990 1.433 ..P WKT 2010 12 18 14 04 55 31.3200 -97.3300 251.000 30.0 160.330 4.830 -999.990 -999.990 1.603 ..P WKT 2010 12 18 14 09 55 31.3200 -97.3300 251.000 122.0 158.253 4.950 -999.990 -999.990 1.583 ..P WKT 2010 12 18 14 14 55 31.3200 -97.3300 251.000 457.0 143.908 4.730 -999.990 -999.990 1.439 ..P WKT 2010 12 18 14 19 55 31.3200 -97.3300 251.000 30.0 153.300 5.030 -999.990 -999.990 1.533 ..P WKT 2010 12 18 14 24 55 31.3200 -97.3300 251.000 122.0 167.490 6.370 -999.990 -999.990 1.675 ..P WKT 2010 12 18 14 29 55 31.3200 -97.3300 251.000 457.0 145.016 4.830 -999.990 -999.990 1.450 ..P WKT 2010 12 18 14 39 55 31.3200 -97.3300 251.000 30.0 161.089 5.090 -999.990 -999.990 1.611 ..P WKT 2010 12 18 14 44 55 31.3200 -97.3300 251.000 122.0 151.778 5.640 -999.990 -999.990 1.518 ..P WKT 2010 12 18 14 49 55 31.3200 -97.3300 251.000 457.0 144.068 4.700 -999.990 -999.990 1.441 ..P WKT 2010 12 18 14 54 55 31.3200 -97.3300 251.000 30.0 165.410 4.730 -999.990 -999.990 1.654 ..P WKT 2010 12 18 14 59 55 31.3200 -97.3300 251.000 122.0 163.562 4.950 -999.990 -999.990 1.636 ..P WKT 2010 12 18 15 04 55 31.3200 -97.3300 251.000 457.0 137.466 5.430 -999.990 -999.990 1.375 ..P WKT 2010 12 18 15 14 55 31.3200 -97.3300 251.000 30.0 167.956 5.830 -999.990 -999.990 1.680 ..P WKT 2010 12 18 15 19 55 31.3200 -97.3300 251.000 122.0 170.981 4.910 -999.990 -999.990 1.710 ..P WKT 2010 12 18 15 24 55 31.3200 -97.3300 251.000 457.0 136.979 4.800 -999.990 -999.990 1.370 ..P WKT 2010 12 18 15 29 55 31.3200 -97.3300 251.000 30.0 174.898 4.790 -999.990 -999.990 1.749 ..P WKT 2010 12 18 15 34 55 31.3200 -97.3300 251.000 122.0 171.263 4.640 -999.990 -999.990 1.713 ..P WKT 2010 12 18 15 39 55 31.3200 -97.3300 251.000 457.0 133.276 4.510 -999.990 -999.990 1.333 ..P WKT 2010 12 18 15 49 55 31.3200 -97.3300 251.000 30.0 169.300 4.630 -999.990 -999.990 1.693 ..P WKT 2010 12 18 15 54 55 31.3200 -97.3300 251.000 122.0 172.741 4.850 -999.990 -999.990 1.727 ..P WKT 2010 12 18 15 59 55 31.3200 -97.3300 251.000 457.0 148.229 4.840 -999.990 -999.990 1.482 ..P WKT 2010 12 18 16 04 55 31.3200 -97.3300 251.000 30.0 170.836 4.880 -999.990 -999.990 1.708 ..P WKT 2010 12 18 16 09 55 31.3200 -97.3300 251.000 122.0 169.752 5.810 -999.990 -999.990 1.698 ..P WKT 2010 12 18 16 14 55 31.3200 -97.3300 251.000 457.0 148.973 4.900 -999.990 -999.990 1.490 ..P WKT 2010 12 18 16 24 55 31.3200 -97.3300 251.000 30.0 165.186 5.510 -999.990 -999.990 1.652 ..P WKT 2010 12 18 16 29 55 31.3200 -97.3300 251.000 122.0 166.516 5.110 -999.990 -999.990 1.665 ..P WKT 2010 12 18 16 34 55 31.3200 -97.3300 251.000 457.0 160.396 5.180 -999.990 -999.990 1.604 ..P WKT 2010 12 18 16 39 55 31.3200 -97.3300 251.000 30.0 157.203 5.210 -999.990 -999.990 1.572 ..P WKT 2010 12 18 16 44 55 31.3200 -97.3300 251.000 122.0 156.938 5.370 -999.990 -999.990 1.569 ..P WKT 2010 12 18 16 49 55 31.3200 -97.3300 251.000 457.0 152.416 5.600 -999.990 -999.990 1.524 ..P WKT 2010 12 18 17 04 55 31.3200 -97.3300 251.000 30.0 151.216 5.420 -999.990 -999.990 1.512 ..P WKT 2010 12 18 17 09 55 31.3200 -97.3300 251.000 122.0 141.443 5.400 -999.990 -999.990 1.414 ..P WKT 2010 12 18 17 14 55 31.3200 -97.3300 251.000 457.0 137.654 5.000 -999.990 -999.990 1.377 ..P WKT 2010 12 18 17 19 55 31.3200 -97.3300 251.000 30.0 147.555 5.110 -999.990 -999.990 1.476 ..P WKT 2010 12 18 17 24 55 31.3200 -97.3300 251.000 122.0 144.430 6.570 -999.990 -999.990 1.444 ..P WKT 2010 12 18 17 29 55 31.3200 -97.3300 251.000 457.0 143.433 4.620 -999.990 -999.990 1.434 ..P WKT 2010 12 18 17 39 55 31.3200 -97.3300 251.000 30.0 143.955 4.770 -999.990 -999.990 1.440 ..P WKT 2010 12 18 17 44 55 31.3200 -97.3300 251.000 122.0 146.005 5.550 -999.990 -999.990 1.460 ..P WKT 2010 12 18 17 49 55 31.3200 -97.3300 251.000 457.0 148.587 5.660 -999.990 -999.990 1.486 ..P WKT 2010 12 18 17 54 55 31.3200 -97.3300 251.000 30.0 145.988 5.090 -999.990 -999.990 1.460 ..P WKT 2010 12 18 17 59 55 31.3200 -97.3300 251.000 122.0 147.773 5.730 -999.990 -999.990 1.478 ..P WKT 2010 12 18 18 04 55 31.3200 -97.3300 251.000 457.0 150.354 5.280 -999.990 -999.990 1.504 ..P WKT 2010 12 18 18 14 55 31.3200 -97.3300 251.000 30.0 147.301 5.320 -999.990 -999.990 1.473 ..P WKT 2010 12 18 18 19 55 31.3200 -97.3300 251.000 122.0 142.731 5.160 -999.990 -999.990 1.427 ..P WKT 2010 12 18 18 24 55 31.3200 -97.3300 251.000 457.0 140.418 6.420 -999.990 -999.990 1.404 ..P WKT 2010 12 18 18 29 55 31.3200 -97.3300 251.000 30.0 147.398 5.600 -999.990 -999.990 1.474 ..P WKT 2010 12 18 18 34 55 31.3200 -97.3300 251.000 122.0 144.156 5.150 -999.990 -999.990 1.442 ..P WKT 2010 12 18 18 39 55 31.3200 -97.3300 251.000 457.0 143.702 5.210 -999.990 -999.990 1.437 ..P WKT 2010 12 18 18 49 55 31.3200 -97.3300 251.000 30.0 143.250 5.040 -999.990 -999.990 1.433 ..P WKT 2010 12 18 18 54 55 31.3200 -97.3300 251.000 122.0 144.445 4.880 -999.990 -999.990 1.444 ..P WKT 2010 12 18 18 59 55 31.3200 -97.3300 251.000 457.0 140.599 5.520 -999.990 -999.990 1.406 ..P WKT 2010 12 18 19 04 55 31.3200 -97.3300 251.000 30.0 144.978 4.940 -999.990 -999.990 1.450 ..P WKT 2010 12 18 19 09 55 31.3200 -97.3300 251.000 122.0 141.928 5.580 -999.990 -999.990 1.419 ..P WKT 2010 12 18 19 14 55 31.3200 -97.3300 251.000 457.0 142.328 5.020 -999.990 -999.990 1.423 ..P WKT 2010 12 18 19 24 55 31.3200 -97.3300 251.000 30.0 140.133 5.010 -999.990 -999.990 1.401 ..P WKT 2010 12 18 19 29 55 31.3200 -97.3300 251.000 122.0 145.495 5.350 -999.990 -999.990 1.455 ..P WKT 2010 12 18 19 34 55 31.3200 -97.3300 251.000 457.0 146.879 5.110 -999.990 -999.990 1.469 ..P WKT 2010 12 18 19 39 55 31.3200 -97.3300 251.000 30.0 140.308 5.370 -999.990 -999.990 1.403 ..P WKT 2010 12 18 19 44 55 31.3200 -97.3300 251.000 122.0 135.063 4.860 -999.990 -999.990 1.351 ..P WKT 2010 12 18 19 49 55 31.3200 -97.3300 251.000 457.0 139.893 4.960 -999.990 -999.990 1.399 ..P WKT 2010 12 18 19 59 55 31.3200 -97.3300 251.000 30.0 138.684 4.830 -999.990 -999.990 1.387 ..P WKT 2010 12 18 20 04 55 31.3200 -97.3300 251.000 122.0 138.213 5.330 -999.990 -999.990 1.382 ..P WKT 2010 12 18 20 09 55 31.3200 -97.3300 251.000 457.0 132.971 4.850 -999.990 -999.990 1.330 ..P WKT 2010 12 18 20 14 55 31.3200 -97.3300 251.000 30.0 137.005 4.930 -999.990 -999.990 1.370 ..P WKT 2010 12 18 20 19 55 31.3200 -97.3300 251.000 122.0 142.893 5.050 -999.990 -999.990 1.429 ..P WKT 2010 12 18 20 24 55 31.3200 -97.3300 251.000 457.0 139.242 5.050 -999.990 -999.990 1.392 ..P WKT 2010 12 18 20 34 55 31.3200 -97.3300 251.000 30.0 144.959 5.920 -999.990 -999.990 1.450 ..P WKT 2010 12 18 20 39 55 31.3200 -97.3300 251.000 122.0 138.963 5.230 -999.990 -999.990 1.390 ..P WKT 2010 12 18 20 44 55 31.3200 -97.3300 251.000 457.0 142.634 5.670 -999.990 -999.990 1.426 ..P WKT 2010 12 18 20 49 55 31.3200 -97.3300 251.000 30.0 145.644 5.620 -999.990 -999.990 1.456 ..P WKT 2010 12 18 20 54 55 31.3200 -97.3300 251.000 122.0 142.958 5.450 -999.990 -999.990 1.430 ..P WKT 2010 12 18 20 59 55 31.3200 -97.3300 251.000 457.0 138.686 5.620 -999.990 -999.990 1.387 ..P WKT 2010 12 18 21 09 55 31.3200 -97.3300 251.000 30.0 140.599 5.610 -999.990 -999.990 1.406 ..P WKT 2010 12 18 21 14 55 31.3200 -97.3300 251.000 122.0 143.342 5.400 -999.990 -999.990 1.433 ..P WKT 2010 12 18 21 19 55 31.3200 -97.3300 251.000 457.0 144.232 5.490 -999.990 -999.990 1.442 ..P WKT 2010 12 18 21 24 55 31.3200 -97.3300 251.000 30.0 136.651 6.880 -999.990 -999.990 1.367 ..P WKT 2010 12 18 21 29 55 31.3200 -97.3300 251.000 122.0 143.629 6.120 -999.990 -999.990 1.436 ..P WKT 2010 12 18 21 34 55 31.3200 -97.3300 251.000 457.0 142.798 5.190 -999.990 -999.990 1.428 ..P WKT 2010 12 18 21 44 55 31.3200 -97.3300 251.000 30.0 146.580 6.020 -999.990 -999.990 1.466 ..P WKT 2010 12 18 21 49 55 31.3200 -97.3300 251.000 122.0 145.636 5.840 -999.990 -999.990 1.456 ..P WKT 2010 12 18 21 54 55 31.3200 -97.3300 251.000 457.0 143.634 7.430 -999.990 -999.990 1.436 ..P WKT 2010 12 18 21 59 55 31.3200 -97.3300 251.000 30.0 138.459 5.730 -999.990 -999.990 1.385 ..P WKT 2010 12 18 22 04 55 31.3200 -97.3300 251.000 122.0 134.474 6.250 -999.990 -999.990 1.345 ..P WKT 2010 12 18 22 09 55 31.3200 -97.3300 251.000 457.0 135.912 6.050 -999.990 -999.990 1.359 ..P WKT 2010 12 18 22 19 55 31.3200 -97.3300 251.000 30.0 133.498 6.020 -999.990 -999.990 1.335 ..P WKT 2010 12 18 22 24 55 31.3200 -97.3300 251.000 122.0 144.322 6.000 -999.990 -999.990 1.443 ..P WKT 2010 12 18 22 29 55 31.3200 -97.3300 251.000 457.0 139.941 6.240 -999.990 -999.990 1.399 ..P WKT 2010 12 18 22 34 55 31.3200 -97.3300 251.000 30.0 135.959 6.070 -999.990 -999.990 1.360 ..P WKT 2010 12 18 22 39 55 31.3200 -97.3300 251.000 122.0 135.677 6.130 -999.990 -999.990 1.357 ..P WKT 2010 12 18 22 44 55 31.3200 -97.3300 251.000 457.0 138.039 6.160 -999.990 -999.990 1.380 ..P WKT 2010 12 18 22 54 55 31.3200 -97.3300 251.000 30.0 135.475 5.930 -999.990 -999.990 1.355 ..P WKT 2010 12 18 22 59 55 31.3200 -97.3300 251.000 122.0 141.120 5.760 -999.990 -999.990 1.411 ..P WKT 2010 12 18 23 04 55 31.3200 -97.3300 251.000 457.0 134.611 5.850 -999.990 -999.990 1.346 ..P WKT 2010 12 18 23 09 55 31.3200 -97.3300 251.000 30.0 134.971 5.590 -999.990 -999.990 1.350 ..P WKT 2010 12 18 23 14 55 31.3200 -97.3300 251.000 122.0 138.238 5.920 -999.990 -999.990 1.382 ..P WKT 2010 12 18 23 19 55 31.3200 -97.3300 251.000 457.0 134.372 6.020 -999.990 -999.990 1.344 ..P WKT 2010 12 18 23 29 55 31.3200 -97.3300 251.000 30.0 132.669 5.450 -999.990 -999.990 1.327 ..P WKT 2010 12 18 23 34 55 31.3200 -97.3300 251.000 122.0 139.055 6.140 -999.990 -999.990 1.391 ..P WKT 2010 12 18 23 39 55 31.3200 -97.3300 251.000 457.0 139.633 5.620 -999.990 -999.990 1.396 ..P WKT 2010 12 18 23 44 55 31.3200 -97.3300 251.000 30.0 146.810 5.710 -999.990 -999.990 1.468 ..P WKT 2010 12 18 23 49 55 31.3200 -97.3300 251.000 122.0 146.329 5.830 -999.990 -999.990 1.463 ..P WKT 2010 12 19 00 09 55 31.3200 -97.3300 251.000 457.0 138.507 6.050 -999.990 -999.990 1.385 ..P WKT 2010 12 19 00 10 25 31.3200 -97.3300 251.000 457.0 138.207 6.000 -999.990 -999.990 1.382 ..P WKT 2010 12 19 00 10 55 31.3200 -97.3300 251.000 457.0 137.115 5.830 -999.990 -999.990 1.371 ..P WKT 2010 12 19 00 11 25 31.3200 -97.3300 251.000 457.0 140.247 6.040 -999.990 -999.990 1.402 ..P WKT 2010 12 19 00 11 55 31.3200 -97.3300 251.000 457.0 143.379 5.820 -999.990 -999.990 1.434 ..P WKT 2010 12 19 00 12 25 31.3200 -97.3300 251.000 457.0 145.719 6.020 -999.990 -999.990 1.457 ..P WKT 2010 12 19 00 12 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2010 12 19 00 13 25 31.3200 -97.3300 251.000 457.0 142.214 5.790 -999.990 -999.990 1.422 ..P WKT 2010 12 19 00 13 55 31.3200 -97.3300 251.000 457.0 140.066 5.980 -999.990 -999.990 1.401 ..P WKT 2010 12 19 00 14 25 31.3200 -97.3300 251.000 457.0 140.293 5.730 -999.990 -999.990 1.403 ..P WKT 2010 12 19 00 14 55 31.3200 -97.3300 251.000 457.0 142.370 5.960 -999.990 -999.990 1.424 ..P WKT 2010 12 19 00 19 55 31.3200 -97.3300 251.000 30.0 146.496 5.900 -999.990 -999.990 1.465 ..P WKT 2010 12 19 00 24 55 31.3200 -97.3300 251.000 122.0 142.966 6.140 -999.990 -999.990 1.430 ..P WKT 2010 12 19 00 29 55 31.3200 -97.3300 251.000 457.0 138.114 5.400 -999.990 -999.990 1.381 ..P WKT 2010 12 19 00 34 55 31.3200 -97.3300 251.000 30.0 141.978 5.600 -999.990 -999.990 1.420 ..P WKT 2010 12 19 00 39 55 31.3200 -97.3300 251.000 122.0 142.937 5.230 -999.990 -999.990 1.429 ..P WKT 2010 12 19 00 44 55 31.3200 -97.3300 251.000 457.0 138.479 5.410 -999.990 -999.990 1.385 ..P WKT 2010 12 19 00 54 55 31.3200 -97.3300 251.000 30.0 144.989 5.240 -999.990 -999.990 1.450 ..P WKT 2010 12 19 00 59 55 31.3200 -97.3300 251.000 122.0 141.818 5.340 -999.990 -999.990 1.418 ..P WKT 2010 12 19 01 04 55 31.3200 -97.3300 251.000 457.0 139.307 5.430 -999.990 -999.990 1.393 ..P WKT 2010 12 19 01 09 55 31.3200 -97.3300 251.000 30.0 136.928 5.370 -999.990 -999.990 1.369 ..P WKT 2010 12 19 01 14 55 31.3200 -97.3300 251.000 122.0 141.820 5.960 -999.990 -999.990 1.418 ..P WKT 2010 12 19 01 19 55 31.3200 -97.3300 251.000 457.0 138.251 6.000 -999.990 -999.990 1.383 ..P WKT 2010 12 19 01 29 55 31.3200 -97.3300 251.000 30.0 138.988 5.640 -999.990 -999.990 1.390 ..P WKT 2010 12 19 01 34 55 31.3200 -97.3300 251.000 122.0 137.873 5.480 -999.990 -999.990 1.379 ..P WKT 2010 12 19 01 39 55 31.3200 -97.3300 251.000 457.0 140.463 5.510 -999.990 -999.990 1.405 ..P WKT 2010 12 19 01 44 55 31.3200 -97.3300 251.000 30.0 143.450 5.530 -999.990 -999.990 1.434 ..P WKT 2010 12 19 01 49 55 31.3200 -97.3300 251.000 122.0 138.498 5.460 -999.990 -999.990 1.385 ..P WKT 2010 12 19 01 54 55 31.3200 -97.3300 251.000 457.0 140.560 5.620 -999.990 -999.990 1.406 ..P WKT 2010 12 19 02 04 55 31.3200 -97.3300 251.000 30.0 142.433 5.340 -999.990 -999.990 1.424 ..P WKT 2010 12 19 02 09 55 31.3200 -97.3300 251.000 122.0 139.596 5.370 -999.990 -999.990 1.396 ..P WKT 2010 12 19 02 14 55 31.3200 -97.3300 251.000 457.0 141.792 5.380 -999.990 -999.990 1.418 ..P WKT 2010 12 19 02 19 55 31.3200 -97.3300 251.000 30.0 153.391 5.520 -999.990 -999.990 1.534 ..P WKT 2010 12 19 02 24 55 31.3200 -97.3300 251.000 122.0 139.824 5.450 -999.990 -999.990 1.398 ..P WKT 2010 12 19 02 29 55 31.3200 -97.3300 251.000 457.0 139.106 5.340 -999.990 -999.990 1.391 ..P WKT 2010 12 19 02 39 55 31.3200 -97.3300 251.000 30.0 143.214 5.440 -999.990 -999.990 1.432 ..P WKT 2010 12 19 02 44 55 31.3200 -97.3300 251.000 122.0 144.863 5.240 -999.990 -999.990 1.449 ..P WKT 2010 12 19 02 49 55 31.3200 -97.3300 251.000 457.0 142.535 5.280 -999.990 -999.990 1.425 ..P WKT 2010 12 19 02 54 55 31.3200 -97.3300 251.000 30.0 143.388 5.730 -999.990 -999.990 1.434 ..P WKT 2010 12 19 02 59 55 31.3200 -97.3300 251.000 122.0 140.529 6.000 -999.990 -999.990 1.405 ..P WKT 2010 12 19 03 04 55 31.3200 -97.3300 251.000 457.0 135.547 5.780 -999.990 -999.990 1.355 ..P WKT 2010 12 19 03 14 55 31.3200 -97.3300 251.000 30.0 141.194 5.010 -999.990 -999.990 1.412 ..P WKT 2010 12 19 03 19 55 31.3200 -97.3300 251.000 122.0 138.294 5.470 -999.990 -999.990 1.383 ..P WKT 2010 12 19 03 24 55 31.3200 -97.3300 251.000 457.0 135.926 5.550 -999.990 -999.990 1.359 ..P WKT 2010 12 19 03 29 55 31.3200 -97.3300 251.000 30.0 145.233 6.330 -999.990 -999.990 1.452 ..P WKT 2010 12 19 03 34 55 31.3200 -97.3300 251.000 122.0 134.371 5.740 -999.990 -999.990 1.344 ..P WKT 2010 12 19 03 39 55 31.3200 -97.3300 251.000 457.0 141.291 5.200 -999.990 -999.990 1.413 ..P WKT 2010 12 19 03 49 55 31.3200 -97.3300 251.000 30.0 144.403 5.780 -999.990 -999.990 1.444 ..P WKT 2010 12 19 03 54 55 31.3200 -97.3300 251.000 122.0 137.936 5.820 -999.990 -999.990 1.379 ..P WKT 2010 12 19 03 59 55 31.3200 -97.3300 251.000 457.0 138.107 6.050 -999.990 -999.990 1.381 ..P WKT 2010 12 19 04 04 55 31.3200 -97.3300 251.000 30.0 142.262 5.880 -999.990 -999.990 1.423 ..P WKT 2010 12 19 04 09 55 31.3200 -97.3300 251.000 122.0 141.637 6.210 -999.990 -999.990 1.416 ..P WKT 2010 12 19 04 14 55 31.3200 -97.3300 251.000 457.0 138.620 5.220 -999.990 -999.990 1.386 ..P WKT 2010 12 19 04 24 55 31.3200 -97.3300 251.000 30.0 146.841 5.120 -999.990 -999.990 1.468 ..P WKT 2010 12 19 04 29 55 31.3200 -97.3300 251.000 122.0 144.526 5.600 -999.990 -999.990 1.445 ..P WKT 2010 12 19 04 34 55 31.3200 -97.3300 251.000 457.0 139.419 6.440 -999.990 -999.990 1.394 ..P WKT 2010 12 19 04 39 55 31.3200 -97.3300 251.000 30.0 145.876 5.610 -999.990 -999.990 1.459 ..P WKT 2010 12 19 04 44 55 31.3200 -97.3300 251.000 122.0 144.624 5.000 -999.990 -999.990 1.446 ..P WKT 2010 12 19 04 49 55 31.3200 -97.3300 251.000 457.0 131.670 4.950 -999.990 -999.990 1.317 ..P WKT 2010 12 19 05 04 55 31.3200 -97.3300 251.000 30.0 143.023 5.070 -999.990 -999.990 1.430 ..P WKT 2010 12 19 05 09 55 31.3200 -97.3300 251.000 122.0 141.945 4.950 -999.990 -999.990 1.419 ..P WKT 2010 12 19 05 14 55 31.3200 -97.3300 251.000 457.0 130.888 5.360 -999.990 -999.990 1.309 ..P WKT 2010 12 19 05 19 55 31.3200 -97.3300 251.000 30.0 140.321 5.580 -999.990 -999.990 1.403 ..P WKT 2010 12 19 05 24 55 31.3200 -97.3300 251.000 122.0 140.706 4.970 -999.990 -999.990 1.407 ..P WKT 2010 12 19 05 29 55 31.3200 -97.3300 251.000 457.0 136.699 5.020 -999.990 -999.990 1.367 ..P WKT 2010 12 19 05 39 55 31.3200 -97.3300 251.000 30.0 140.490 5.050 -999.990 -999.990 1.405 ..P WKT 2010 12 19 05 44 55 31.3200 -97.3300 251.000 122.0 134.973 4.940 -999.990 -999.990 1.350 ..P WKT 2010 12 19 05 49 55 31.3200 -97.3300 251.000 457.0 137.314 5.370 -999.990 -999.990 1.373 ..P WKT 2010 12 19 05 54 55 31.3200 -97.3300 251.000 30.0 142.850 5.290 -999.990 -999.990 1.428 ..P WKT 2010 12 19 05 59 55 31.3200 -97.3300 251.000 122.0 132.670 5.710 -999.990 -999.990 1.327 ..P WKT 2010 12 19 06 04 55 31.3200 -97.3300 251.000 457.0 137.809 5.240 -999.990 -999.990 1.378 ..P WKT 2010 12 19 06 14 55 31.3200 -97.3300 251.000 30.0 137.009 5.050 -999.990 -999.990 1.370 ..P WKT 2010 12 19 06 19 55 31.3200 -97.3300 251.000 122.0 135.733 5.600 -999.990 -999.990 1.357 ..P WKT 2010 12 19 06 24 55 31.3200 -97.3300 251.000 457.0 142.723 5.510 -999.990 -999.990 1.427 ..P WKT 2010 12 19 06 29 55 31.3200 -97.3300 251.000 30.0 135.848 6.510 -999.990 -999.990 1.358 ..P WKT 2010 12 19 06 34 55 31.3200 -97.3300 251.000 122.0 134.572 6.050 -999.990 -999.990 1.346 ..P WKT 2010 12 19 06 39 55 31.3200 -97.3300 251.000 457.0 134.628 5.060 -999.990 -999.990 1.346 ..P WKT 2010 12 19 06 49 55 31.3200 -97.3300 251.000 30.0 142.955 5.190 -999.990 -999.990 1.430 ..P WKT 2010 12 19 06 54 55 31.3200 -97.3300 251.000 122.0 135.886 5.640 -999.990 -999.990 1.359 ..P WKT 2010 12 19 06 59 55 31.3200 -97.3300 251.000 457.0 138.954 5.860 -999.990 -999.990 1.390 ..P WKT 2010 12 19 07 04 55 31.3200 -97.3300 251.000 30.0 146.293 6.550 -999.990 -999.990 1.463 ..P WKT 2010 12 19 07 09 55 31.3200 -97.3300 251.000 122.0 142.959 6.090 -999.990 -999.990 1.430 ..P WKT 2010 12 19 07 14 55 31.3200 -97.3300 251.000 457.0 134.818 5.570 -999.990 -999.990 1.348 ..P WKT 2010 12 19 07 24 55 31.3200 -97.3300 251.000 30.0 146.375 5.490 -999.990 -999.990 1.464 ..P WKT 2010 12 19 07 29 55 31.3200 -97.3300 251.000 122.0 135.103 6.280 -999.990 -999.990 1.351 ..P WKT 2010 12 19 07 34 55 31.3200 -97.3300 251.000 457.0 134.511 6.080 -999.990 -999.990 1.345 ..P WKT 2010 12 19 07 39 55 31.3200 -97.3300 251.000 30.0 147.009 6.470 -999.990 -999.990 1.470 ..P WKT 2010 12 19 07 44 55 31.3200 -97.3300 251.000 122.0 131.725 5.750 -999.990 -999.990 1.317 ..P WKT 2010 12 19 07 49 55 31.3200 -97.3300 251.000 457.0 136.744 5.530 -999.990 -999.990 1.367 ..P WKT 2010 12 19 07 59 55 31.3200 -97.3300 251.000 30.0 150.623 5.800 -999.990 -999.990 1.506 ..P WKT 2010 12 19 08 04 55 31.3200 -97.3300 251.000 122.0 135.694 6.310 -999.990 -999.990 1.357 ..P WKT 2010 12 19 08 09 55 31.3200 -97.3300 251.000 457.0 137.871 6.000 -999.990 -999.990 1.379 ..P WKT 2010 12 19 08 14 55 31.3200 -97.3300 251.000 30.0 150.208 6.230 -999.990 -999.990 1.502 ..P WKT 2010 12 19 08 19 55 31.3200 -97.3300 251.000 122.0 144.098 6.300 -999.990 -999.990 1.441 ..P WKT 2010 12 19 08 24 55 31.3200 -97.3300 251.000 457.0 142.265 6.290 -999.990 -999.990 1.423 ..P WKT 2010 12 19 08 34 55 31.3200 -97.3300 251.000 30.0 156.330 6.610 -999.990 -999.990 1.563 ..P WKT 2010 12 19 08 39 55 31.3200 -97.3300 251.000 122.0 152.434 5.950 -999.990 -999.990 1.524 ..P WKT 2010 12 19 08 44 55 31.3200 -97.3300 251.000 457.0 145.059 5.950 -999.990 -999.990 1.451 ..P WKT 2010 12 19 08 49 55 31.3200 -97.3300 251.000 30.0 153.471 6.230 -999.990 -999.990 1.535 ..P WKT 2010 12 19 08 54 55 31.3200 -97.3300 251.000 122.0 151.179 5.750 -999.990 -999.990 1.512 ..P WKT 2010 12 19 08 59 55 31.3200 -97.3300 251.000 457.0 139.384 5.660 -999.990 -999.990 1.394 ..P WKT 2010 12 19 09 09 55 31.3200 -97.3300 251.000 30.0 154.475 5.280 -999.990 -999.990 1.545 ..P WKT 2010 12 19 09 14 55 31.3200 -97.3300 251.000 122.0 145.888 5.650 -999.990 -999.990 1.459 ..P WKT 2010 12 19 09 19 55 31.3200 -97.3300 251.000 457.0 133.551 5.380 -999.990 -999.990 1.336 ..P WKT 2010 12 19 09 24 55 31.3200 -97.3300 251.000 30.0 160.720 5.220 -999.990 -999.990 1.607 ..P WKT 2010 12 19 09 29 55 31.3200 -97.3300 251.000 122.0 143.558 5.060 -999.990 -999.990 1.436 ..P WKT 2010 12 19 09 34 55 31.3200 -97.3300 251.000 457.0 146.755 4.880 -999.990 -999.990 1.468 ..P WKT 2010 12 19 09 44 55 31.3200 -97.3300 251.000 30.0 160.024 5.530 -999.990 -999.990 1.600 ..P WKT 2010 12 19 09 49 55 31.3200 -97.3300 251.000 122.0 147.449 5.940 -999.990 -999.990 1.474 ..P WKT 2010 12 19 09 54 55 31.3200 -97.3300 251.000 457.0 140.901 5.420 -999.990 -999.990 1.409 ..P WKT 2010 12 19 09 59 55 31.3200 -97.3300 251.000 30.0 160.762 5.450 -999.990 -999.990 1.608 ..P WKT 2010 12 19 10 04 55 31.3200 -97.3300 251.000 122.0 142.684 5.510 -999.990 -999.990 1.427 ..P WKT 2010 12 19 10 09 55 31.3200 -97.3300 251.000 457.0 156.113 5.770 -999.990 -999.990 1.561 ..P WKT 2010 12 19 10 19 55 31.3200 -97.3300 251.000 30.0 156.981 5.680 -999.990 -999.990 1.570 ..P WKT 2010 12 19 10 24 55 31.3200 -97.3300 251.000 122.0 150.985 5.400 -999.990 -999.990 1.510 ..P WKT 2010 12 19 10 29 55 31.3200 -97.3300 251.000 457.0 153.037 5.950 -999.990 -999.990 1.530 ..P WKT 2010 12 19 10 34 55 31.3200 -97.3300 251.000 30.0 161.532 5.650 -999.990 -999.990 1.615 ..P WKT 2010 12 19 10 39 55 31.3200 -97.3300 251.000 122.0 148.287 5.540 -999.990 -999.990 1.483 ..P WKT 2010 12 19 10 44 55 31.3200 -97.3300 251.000 457.0 153.293 5.180 -999.990 -999.990 1.533 ..P WKT 2010 12 19 10 54 55 31.3200 -97.3300 251.000 30.0 156.635 5.010 -999.990 -999.990 1.566 ..P WKT 2010 12 19 10 59 55 31.3200 -97.3300 251.000 122.0 144.227 5.130 -999.990 -999.990 1.442 ..P WKT 2010 12 19 11 04 55 31.3200 -97.3300 251.000 457.0 146.588 5.190 -999.990 -999.990 1.466 ..P WKT 2010 12 19 11 09 55 31.3200 -97.3300 251.000 30.0 152.710 5.250 -999.990 -999.990 1.527 ..P WKT 2010 12 19 11 14 55 31.3200 -97.3300 251.000 122.0 129.550 5.110 -999.990 -999.990 1.296 ..P WKT 2010 12 19 11 19 55 31.3200 -97.3300 251.000 457.0 152.331 5.010 -999.990 -999.990 1.523 ..P WKT 2010 12 19 11 29 55 31.3200 -97.3300 251.000 30.0 155.958 5.350 -999.990 -999.990 1.560 ..P WKT 2010 12 19 11 34 55 31.3200 -97.3300 251.000 122.0 153.998 5.090 -999.990 -999.990 1.540 ..P WKT 2010 12 19 11 39 55 31.3200 -97.3300 251.000 457.0 154.187 5.160 -999.990 -999.990 1.542 ..P WKT 2010 12 19 11 44 55 31.3200 -97.3300 251.000 30.0 157.604 5.810 -999.990 -999.990 1.576 ..P WKT 2010 12 19 11 49 55 31.3200 -97.3300 251.000 122.0 150.533 5.380 -999.990 -999.990 1.505 ..P WKT 2010 12 19 12 09 55 31.3200 -97.3300 251.000 457.0 147.178 5.300 -999.990 -999.990 1.472 ..P WKT 2010 12 19 12 10 25 31.3200 -97.3300 251.000 457.0 156.762 5.000 -999.990 -999.990 1.568 ..P WKT 2010 12 19 12 10 55 31.3200 -97.3300 251.000 457.0 155.590 5.080 -999.990 -999.990 1.556 ..P WKT 2010 12 19 12 11 25 31.3200 -97.3300 251.000 457.0 156.569 4.950 -999.990 -999.990 1.566 ..P WKT 2010 12 19 12 11 55 31.3200 -97.3300 251.000 457.0 157.279 5.090 -999.990 -999.990 1.573 ..P WKT 2010 12 19 12 12 25 31.3200 -97.3300 251.000 457.0 155.839 5.030 -999.990 -999.990 1.558 ..P WKT 2010 12 19 12 12 55 31.3200 -97.3300 251.000 457.0 155.473 5.090 -999.990 -999.990 1.555 ..P WKT 2010 12 19 12 13 25 31.3200 -97.3300 251.000 457.0 159.409 4.930 -999.990 -999.990 1.594 ..P WKT 2010 12 19 12 13 55 31.3200 -97.3300 251.000 457.0 152.592 5.160 -999.990 -999.990 1.526 ..P WKT 2010 12 19 12 14 25 31.3200 -97.3300 251.000 457.0 155.990 6.100 -999.990 -999.990 1.560 ..P WKT 2010 12 19 12 14 55 31.3200 -97.3300 251.000 457.0 158.583 5.210 -999.990 -999.990 1.586 ..P WKT 2010 12 19 12 19 55 31.3200 -97.3300 251.000 30.0 158.693 5.340 -999.990 -999.990 1.587 ..P WKT 2010 12 19 12 24 55 31.3200 -97.3300 251.000 122.0 175.736 8.110 -999.990 -999.990 1.757 ..P WKT 2010 12 19 12 29 55 31.3200 -97.3300 251.000 457.0 144.670 6.700 -999.990 -999.990 1.447 ..P WKT 2010 12 19 12 34 55 31.3200 -97.3300 251.000 30.0 162.114 6.210 -999.990 -999.990 1.621 ..P WKT 2010 12 19 12 39 55 31.3200 -97.3300 251.000 122.0 213.271 6.170 -999.990 -999.990 2.133 ..P WKT 2010 12 19 12 44 55 31.3200 -97.3300 251.000 457.0 151.052 5.110 -999.990 -999.990 1.511 ..P WKT 2010 12 19 12 54 55 31.3200 -97.3300 251.000 30.0 157.040 5.490 -999.990 -999.990 1.570 ..P WKT 2010 12 19 12 59 55 31.3200 -97.3300 251.000 122.0 230.583 6.660 -999.990 -999.990 2.306 ..P WKT 2010 12 19 13 04 55 31.3200 -97.3300 251.000 457.0 164.628 6.990 -999.990 -999.990 1.646 ..P WKT 2010 12 19 13 09 55 31.3200 -97.3300 251.000 30.0 161.642 5.840 -999.990 -999.990 1.616 ..P WKT 2010 12 19 13 14 55 31.3200 -97.3300 251.000 122.0 210.325 6.530 -999.990 -999.990 2.103 ..P WKT 2010 12 19 13 19 55 31.3200 -97.3300 251.000 457.0 161.979 5.010 -999.990 -999.990 1.620 ..P WKT 2010 12 19 13 29 55 31.3200 -97.3300 251.000 30.0 170.882 4.980 -999.990 -999.990 1.709 ..P WKT 2010 12 19 13 34 55 31.3200 -97.3300 251.000 122.0 201.544 4.990 -999.990 -999.990 2.015 ..P WKT 2010 12 19 13 39 55 31.3200 -97.3300 251.000 457.0 174.262 5.020 -999.990 -999.990 1.743 ..P WKT 2010 12 19 13 44 55 31.3200 -97.3300 251.000 30.0 175.818 5.160 -999.990 -999.990 1.758 ..P WKT 2010 12 19 13 49 55 31.3200 -97.3300 251.000 122.0 213.438 6.280 -999.990 -999.990 2.134 ..P WKT 2010 12 19 13 54 55 31.3200 -97.3300 251.000 457.0 181.609 4.920 -999.990 -999.990 1.816 ..P WKT 2010 12 19 14 04 55 31.3200 -97.3300 251.000 30.0 190.516 4.990 -999.990 -999.990 1.905 ..P WKT 2010 12 19 14 09 55 31.3200 -97.3300 251.000 122.0 220.916 5.300 -999.990 -999.990 2.209 ..P WKT 2010 12 19 14 14 55 31.3200 -97.3300 251.000 457.0 176.280 5.400 -999.990 -999.990 1.763 ..P WKT 2010 12 19 14 19 55 31.3200 -97.3300 251.000 30.0 193.411 5.620 -999.990 -999.990 1.934 ..P WKT 2010 12 19 14 24 55 31.3200 -97.3300 251.000 122.0 193.795 4.800 -999.990 -999.990 1.938 ..P WKT 2010 12 19 14 29 55 31.3200 -97.3300 251.000 457.0 188.151 5.300 -999.990 -999.990 1.882 ..P WKT 2010 12 19 14 39 55 31.3200 -97.3300 251.000 30.0 199.899 4.820 -999.990 -999.990 1.999 ..P WKT 2010 12 19 14 44 55 31.3200 -97.3300 251.000 122.0 192.517 4.880 -999.990 -999.990 1.925 ..P WKT 2010 12 19 14 49 55 31.3200 -97.3300 251.000 457.0 181.658 4.730 -999.990 -999.990 1.817 ..P WKT 2010 12 19 14 54 55 31.3200 -97.3300 251.000 30.0 195.961 6.320 -999.990 -999.990 1.960 ..P WKT 2010 12 19 14 59 55 31.3200 -97.3300 251.000 122.0 187.512 6.140 -999.990 -999.990 1.875 ..P WKT 2010 12 19 15 04 55 31.3200 -97.3300 251.000 457.0 165.688 4.700 -999.990 -999.990 1.657 ..P WKT 2010 12 19 15 14 55 31.3200 -97.3300 251.000 30.0 193.938 4.700 -999.990 -999.990 1.939 ..P WKT 2010 12 19 15 19 55 31.3200 -97.3300 251.000 122.0 195.048 4.690 -999.990 -999.990 1.950 ..P WKT 2010 12 19 15 24 55 31.3200 -97.3300 251.000 457.0 176.366 5.170 -999.990 -999.990 1.764 ..P WKT 2010 12 19 15 29 55 31.3200 -97.3300 251.000 30.0 199.671 4.640 -999.990 -999.990 1.997 ..P WKT 2010 12 19 15 34 55 31.3200 -97.3300 251.000 122.0 193.828 5.020 -999.990 -999.990 1.938 ..P WKT 2010 12 19 15 39 55 31.3200 -97.3300 251.000 457.0 178.630 5.570 -999.990 -999.990 1.786 ..P WKT 2010 12 19 15 49 55 31.3200 -97.3300 251.000 30.0 205.284 4.010 -999.990 -999.990 2.053 ..P WKT 2010 12 19 15 54 55 31.3200 -97.3300 251.000 122.0 213.986 4.300 -999.990 -999.990 2.140 ..P WKT 2010 12 19 15 59 55 31.3200 -97.3300 251.000 457.0 174.330 4.260 -999.990 -999.990 1.743 ..P WKT 2010 12 19 16 04 55 31.3200 -97.3300 251.000 30.0 208.411 4.200 -999.990 -999.990 2.084 ..P WKT 2010 12 19 16 09 55 31.3200 -97.3300 251.000 122.0 205.090 4.280 -999.990 -999.990 2.051 ..P WKT 2010 12 19 16 14 55 31.3200 -97.3300 251.000 457.0 173.998 3.960 -999.990 -999.990 1.740 ..P WKT 2010 12 19 16 24 55 31.3200 -97.3300 251.000 30.0 205.946 4.230 -999.990 -999.990 2.059 ..P WKT 2010 12 19 16 29 55 31.3200 -97.3300 251.000 122.0 205.297 4.330 -999.990 -999.990 2.053 ..P WKT 2010 12 19 16 34 55 31.3200 -97.3300 251.000 457.0 180.895 4.570 -999.990 -999.990 1.809 ..P WKT 2010 12 19 16 39 55 31.3200 -97.3300 251.000 30.0 198.396 3.980 -999.990 -999.990 1.984 ..P WKT 2010 12 19 16 44 55 31.3200 -97.3300 251.000 122.0 200.816 4.030 -999.990 -999.990 2.008 ..P WKT 2010 12 19 16 49 55 31.3200 -97.3300 251.000 457.0 187.097 4.320 -999.990 -999.990 1.871 ..P WKT 2010 12 19 17 04 55 31.3200 -97.3300 251.000 30.0 194.188 3.660 -999.990 -999.990 1.942 ..P WKT 2010 12 19 17 09 55 31.3200 -97.3300 251.000 122.0 192.922 3.960 -999.990 -999.990 1.929 ..P WKT 2010 12 19 17 14 55 31.3200 -97.3300 251.000 457.0 182.327 3.950 -999.990 -999.990 1.823 ..P WKT 2010 12 19 17 19 55 31.3200 -97.3300 251.000 30.0 195.990 3.830 -999.990 -999.990 1.960 ..P WKT 2010 12 19 17 24 55 31.3200 -97.3300 251.000 122.0 192.459 3.530 -999.990 -999.990 1.925 ..P WKT 2010 12 19 17 29 55 31.3200 -97.3300 251.000 457.0 193.726 4.020 -999.990 -999.990 1.937 ..P WKT 2010 12 19 17 39 55 31.3200 -97.3300 251.000 30.0 196.610 3.530 -999.990 -999.990 1.966 ..P WKT 2010 12 19 17 44 55 31.3200 -97.3300 251.000 122.0 199.027 3.460 -999.990 -999.990 1.990 ..P WKT 2010 12 19 17 49 55 31.3200 -97.3300 251.000 457.0 195.318 3.890 -999.990 -999.990 1.953 ..P WKT 2010 12 19 17 54 55 31.3200 -97.3300 251.000 30.0 190.012 3.470 -999.990 -999.990 1.900 ..P WKT 2010 12 19 17 59 55 31.3200 -97.3300 251.000 122.0 187.237 5.030 -999.990 -999.990 1.872 ..P WKT 2010 12 19 18 04 55 31.3200 -97.3300 251.000 457.0 190.053 3.270 -999.990 -999.990 1.901 ..P WKT 2010 12 19 18 14 55 31.3200 -97.3300 251.000 30.0 183.973 3.800 -999.990 -999.990 1.840 ..P WKT 2010 12 19 18 19 55 31.3200 -97.3300 251.000 122.0 193.706 5.040 -999.990 -999.990 1.937 ..P WKT 2010 12 19 18 24 55 31.3200 -97.3300 251.000 457.0 191.997 3.560 -999.990 -999.990 1.920 ..P WKT 2010 12 19 18 29 55 31.3200 -97.3300 251.000 30.0 178.583 3.320 -999.990 -999.990 1.786 ..P WKT 2010 12 19 18 34 55 31.3200 -97.3300 251.000 122.0 187.249 3.190 -999.990 -999.990 1.872 ..P WKT 2010 12 19 18 39 55 31.3200 -97.3300 251.000 457.0 182.616 3.120 -999.990 -999.990 1.826 ..P WKT 2010 12 19 18 49 55 31.3200 -97.3300 251.000 30.0 185.963 3.380 -999.990 -999.990 1.860 ..P WKT 2010 12 19 18 54 55 31.3200 -97.3300 251.000 122.0 185.168 3.060 -999.990 -999.990 1.852 ..P WKT 2010 12 19 18 59 55 31.3200 -97.3300 251.000 457.0 182.512 3.460 -999.990 -999.990 1.825 ..P WKT 2010 12 19 19 04 55 31.3200 -97.3300 251.000 30.0 180.389 3.590 -999.990 -999.990 1.804 ..P WKT 2010 12 19 19 09 55 31.3200 -97.3300 251.000 122.0 180.392 3.120 -999.990 -999.990 1.804 ..P WKT 2010 12 19 19 14 55 31.3200 -97.3300 251.000 457.0 176.143 3.850 -999.990 -999.990 1.761 ..P WKT 2010 12 19 19 24 55 31.3200 -97.3300 251.000 30.0 176.833 2.880 -999.990 -999.990 1.768 ..P WKT 2010 12 19 19 29 55 31.3200 -97.3300 251.000 122.0 176.191 4.730 -999.990 -999.990 1.762 ..P WKT 2010 12 19 19 34 55 31.3200 -97.3300 251.000 457.0 175.284 3.430 -999.990 -999.990 1.753 ..P WKT 2010 12 19 19 39 55 31.3200 -97.3300 251.000 30.0 173.582 3.870 -999.990 -999.990 1.736 ..P WKT 2010 12 19 19 44 55 31.3200 -97.3300 251.000 122.0 171.878 3.910 -999.990 -999.990 1.719 ..P WKT 2010 12 19 19 49 55 31.3200 -97.3300 251.000 457.0 176.546 2.900 -999.990 -999.990 1.765 ..P WKT 2010 12 19 19 59 55 31.3200 -97.3300 251.000 30.0 175.700 3.120 -999.990 -999.990 1.757 ..P WKT 2010 12 19 20 04 55 31.3200 -97.3300 251.000 122.0 180.005 3.500 -999.990 -999.990 1.800 ..P WKT 2010 12 19 20 09 55 31.3200 -97.3300 251.000 457.0 174.759 4.290 -999.990 -999.990 1.748 ..P WKT 2010 12 19 20 14 55 31.3200 -97.3300 251.000 30.0 180.389 4.420 -999.990 -999.990 1.804 ..P WKT 2010 12 19 20 19 55 31.3200 -97.3300 251.000 122.0 185.487 3.070 -999.990 -999.990 1.855 ..P WKT 2010 12 19 20 24 55 31.3200 -97.3300 251.000 457.0 182.496 5.970 -999.990 -999.990 1.825 ..P WKT 2010 12 19 20 34 55 31.3200 -97.3300 251.000 30.0 189.336 4.740 -999.990 -999.990 1.893 ..P WKT 2010 12 19 20 39 55 31.3200 -97.3300 251.000 122.0 186.574 2.810 -999.990 -999.990 1.866 ..P WKT 2010 12 19 20 44 55 31.3200 -97.3300 251.000 457.0 184.209 3.950 -999.990 -999.990 1.842 ..P WKT 2010 12 19 20 49 55 31.3200 -97.3300 251.000 30.0 185.556 2.770 -999.990 -999.990 1.856 ..P WKT 2010 12 19 20 54 55 31.3200 -97.3300 251.000 122.0 180.146 3.190 -999.990 -999.990 1.801 ..P WKT 2010 12 19 20 59 55 31.3200 -97.3300 251.000 457.0 180.963 3.910 -999.990 -999.990 1.810 ..P WKT 2010 12 19 21 09 55 31.3200 -97.3300 251.000 30.0 173.289 2.990 -999.990 -999.990 1.733 ..P WKT 2010 12 19 21 14 55 31.3200 -97.3300 251.000 122.0 176.847 2.800 -999.990 -999.990 1.768 ..P WKT 2010 12 19 21 19 55 31.3200 -97.3300 251.000 457.0 178.553 2.890 -999.990 -999.990 1.786 ..P WKT 2010 12 19 21 24 55 31.3200 -97.3300 251.000 30.0 170.199 2.990 -999.990 -999.990 1.702 ..P WKT 2010 12 19 21 29 55 31.3200 -97.3300 251.000 122.0 174.551 3.430 -999.990 -999.990 1.746 ..P WKT 2010 12 19 21 34 55 31.3200 -97.3300 251.000 457.0 174.006 3.770 -999.990 -999.990 1.740 ..P WKT 2010 12 19 21 44 55 31.3200 -97.3300 251.000 30.0 177.301 3.530 -999.990 -999.990 1.773 ..P WKT 2010 12 19 21 49 55 31.3200 -97.3300 251.000 122.0 176.643 3.180 -999.990 -999.990 1.766 ..P WKT 2010 12 19 21 54 55 31.3200 -97.3300 251.000 457.0 178.233 3.180 -999.990 -999.990 1.782 ..P WKT 2010 12 19 21 59 55 31.3200 -97.3300 251.000 30.0 181.276 3.670 -999.990 -999.990 1.813 ..P WKT 2010 12 19 22 04 55 31.3200 -97.3300 251.000 122.0 174.934 3.260 -999.990 -999.990 1.749 ..P WKT 2010 12 19 22 09 55 31.3200 -97.3300 251.000 457.0 173.351 2.920 -999.990 -999.990 1.734 ..P WKT 2010 12 19 22 19 55 31.3200 -97.3300 251.000 30.0 179.927 3.500 -999.990 -999.990 1.799 ..P WKT 2010 12 19 22 24 55 31.3200 -97.3300 251.000 122.0 179.760 2.680 -999.990 -999.990 1.798 ..P WKT 2010 12 19 22 29 55 31.3200 -97.3300 251.000 457.0 177.744 3.110 -999.990 -999.990 1.777 ..P WKT 2010 12 19 22 34 55 31.3200 -97.3300 251.000 30.0 173.352 2.990 -999.990 -999.990 1.734 ..P WKT 2010 12 19 22 39 55 31.3200 -97.3300 251.000 122.0 183.749 3.920 -999.990 -999.990 1.837 ..P WKT 2010 12 19 22 44 55 31.3200 -97.3300 251.000 457.0 171.435 3.570 -999.990 -999.990 1.714 ..P WKT 2010 12 19 22 54 55 31.3200 -97.3300 251.000 30.0 179.645 3.270 -999.990 -999.990 1.796 ..P WKT 2010 12 19 22 59 55 31.3200 -97.3300 251.000 122.0 174.030 3.660 -999.990 -999.990 1.740 ..P WKT 2010 12 19 23 04 55 31.3200 -97.3300 251.000 457.0 173.958 3.360 -999.990 -999.990 1.740 ..P WKT 2010 12 19 23 09 55 31.3200 -97.3300 251.000 30.0 172.831 4.820 -999.990 -999.990 1.728 ..P WKT 2010 12 19 23 14 55 31.3200 -97.3300 251.000 122.0 173.023 3.420 -999.990 -999.990 1.730 ..P WKT 2010 12 19 23 19 55 31.3200 -97.3300 251.000 457.0 166.093 3.660 -999.990 -999.990 1.661 ..P WKT 2010 12 19 23 29 55 31.3200 -97.3300 251.000 30.0 173.510 4.330 -999.990 -999.990 1.735 ..P WKT 2010 12 19 23 34 55 31.3200 -97.3300 251.000 122.0 171.239 4.570 -999.990 -999.990 1.712 ..P WKT 2010 12 19 23 39 55 31.3200 -97.3300 251.000 457.0 168.706 3.860 -999.990 -999.990 1.687 ..P WKT 2010 12 19 23 44 55 31.3200 -97.3300 251.000 30.0 177.771 4.060 -999.990 -999.990 1.778 ..P WKT 2010 12 19 23 49 55 31.3200 -97.3300 251.000 122.0 177.082 4.870 -999.990 -999.990 1.771 ..P WKT 2010 12 20 00 09 55 31.3200 -97.3300 251.000 457.0 177.489 2.270 -999.990 -999.990 1.775 ..P WKT 2010 12 20 00 10 25 31.3200 -97.3300 251.000 457.0 169.306 2.680 -999.990 -999.990 1.693 ..P WKT 2010 12 20 00 10 55 31.3200 -97.3300 251.000 457.0 168.503 2.360 -999.990 -999.990 1.685 ..P WKT 2010 12 20 00 11 25 31.3200 -97.3300 251.000 457.0 168.491 2.290 -999.990 -999.990 1.685 ..P WKT 2010 12 20 00 11 55 31.3200 -97.3300 251.000 457.0 167.425 2.390 -999.990 -999.990 1.674 ..P WKT 2010 12 20 00 12 25 31.3200 -97.3300 251.000 457.0 167.413 2.230 -999.990 -999.990 1.674 ..P WKT 2010 12 20 00 12 55 31.3200 -97.3300 251.000 457.0 173.199 2.470 -999.990 -999.990 1.732 ..P WKT 2010 12 20 00 13 25 31.3200 -97.3300 251.000 457.0 170.288 2.530 -999.990 -999.990 1.703 ..P WKT 2010 12 20 00 13 55 31.3200 -97.3300 251.000 457.0 170.012 2.450 -999.990 -999.990 1.700 ..P WKT 2010 12 20 00 14 25 31.3200 -97.3300 251.000 457.0 173.558 2.940 -999.990 -999.990 1.736 ..P WKT 2010 12 20 00 14 55 31.3200 -97.3300 251.000 457.0 171.043 2.470 -999.990 -999.990 1.710 ..P WKT 2010 12 20 00 19 55 31.3200 -97.3300 251.000 30.0 190.036 3.020 -999.990 -999.990 1.900 ..P WKT 2010 12 20 00 24 55 31.3200 -97.3300 251.000 122.0 173.965 2.990 -999.990 -999.990 1.740 ..P WKT 2010 12 20 00 29 55 31.3200 -97.3300 251.000 457.0 165.141 3.410 -999.990 -999.990 1.651 ..P WKT 2010 12 20 00 34 55 31.3200 -97.3300 251.000 30.0 187.308 3.780 -999.990 -999.990 1.873 ..P WKT 2010 12 20 00 39 55 31.3200 -97.3300 251.000 122.0 173.603 5.470 -999.990 -999.990 1.736 ..P WKT 2010 12 20 00 44 55 31.3200 -97.3300 251.000 457.0 167.281 4.720 -999.990 -999.990 1.673 ..P WKT 2010 12 20 00 54 55 31.3200 -97.3300 251.000 30.0 182.841 4.720 -999.990 -999.990 1.828 ..P WKT 2010 12 20 00 59 55 31.3200 -97.3300 251.000 122.0 162.625 4.240 -999.990 -999.990 1.626 ..P WKT 2010 12 20 01 04 55 31.3200 -97.3300 251.000 457.0 168.146 4.180 -999.990 -999.990 1.681 ..P WKT 2010 12 20 01 09 55 31.3200 -97.3300 251.000 30.0 176.572 3.860 -999.990 -999.990 1.766 ..P WKT 2010 12 20 01 14 55 31.3200 -97.3300 251.000 122.0 163.609 3.900 -999.990 -999.990 1.636 ..P WKT 2010 12 20 01 19 55 31.3200 -97.3300 251.000 457.0 167.284 3.540 -999.990 -999.990 1.673 ..P WKT 2010 12 20 01 29 55 31.3200 -97.3300 251.000 30.0 172.352 4.300 -999.990 -999.990 1.724 ..P WKT 2010 12 20 01 34 55 31.3200 -97.3300 251.000 122.0 162.117 3.300 -999.990 -999.990 1.621 ..P WKT 2010 12 20 01 39 55 31.3200 -97.3300 251.000 457.0 160.997 3.250 -999.990 -999.990 1.610 ..P WKT 2010 12 20 01 44 55 31.3200 -97.3300 251.000 30.0 176.929 2.810 -999.990 -999.990 1.769 ..P WKT 2010 12 20 01 49 55 31.3200 -97.3300 251.000 122.0 167.219 3.360 -999.990 -999.990 1.672 ..P WKT 2010 12 20 01 54 55 31.3200 -97.3300 251.000 457.0 166.894 3.410 -999.990 -999.990 1.669 ..P WKT 2010 12 20 02 04 55 31.3200 -97.3300 251.000 30.0 175.368 3.020 -999.990 -999.990 1.754 ..P WKT 2010 12 20 02 09 55 31.3200 -97.3300 251.000 122.0 164.328 3.500 -999.990 -999.990 1.643 ..P WKT 2010 12 20 02 14 55 31.3200 -97.3300 251.000 457.0 162.943 2.770 -999.990 -999.990 1.629 ..P WKT 2010 12 20 02 19 55 31.3200 -97.3300 251.000 30.0 168.175 3.350 -999.990 -999.990 1.682 ..P WKT 2010 12 20 02 24 55 31.3200 -97.3300 251.000 122.0 167.584 3.590 -999.990 -999.990 1.676 ..P WKT 2010 12 20 02 29 55 31.3200 -97.3300 251.000 457.0 168.053 3.460 -999.990 -999.990 1.681 ..P WKT 2010 12 20 02 39 55 31.3200 -97.3300 251.000 30.0 171.884 3.280 -999.990 -999.990 1.719 ..P WKT 2010 12 20 02 44 55 31.3200 -97.3300 251.000 122.0 167.567 3.010 -999.990 -999.990 1.676 ..P WKT 2010 12 20 02 49 55 31.3200 -97.3300 251.000 457.0 175.169 3.400 -999.990 -999.990 1.752 ..P WKT 2010 12 20 02 54 55 31.3200 -97.3300 251.000 30.0 171.646 2.910 -999.990 -999.990 1.716 ..P WKT 2010 12 20 02 59 55 31.3200 -97.3300 251.000 122.0 163.882 2.880 -999.990 -999.990 1.639 ..P WKT 2010 12 20 03 04 55 31.3200 -97.3300 251.000 457.0 165.921 2.740 -999.990 -999.990 1.659 ..P WKT 2010 12 20 03 14 55 31.3200 -97.3300 251.000 30.0 171.554 3.250 -999.990 -999.990 1.716 ..P WKT 2010 12 20 03 19 55 31.3200 -97.3300 251.000 122.0 162.687 3.050 -999.990 -999.990 1.627 ..P WKT 2010 12 20 03 24 55 31.3200 -97.3300 251.000 457.0 158.590 3.150 -999.990 -999.990 1.586 ..P WKT 2010 12 20 03 29 55 31.3200 -97.3300 251.000 30.0 165.366 3.700 -999.990 -999.990 1.654 ..P WKT 2010 12 20 03 34 55 31.3200 -97.3300 251.000 122.0 159.147 3.390 -999.990 -999.990 1.591 ..P WKT 2010 12 20 03 39 55 31.3200 -97.3300 251.000 457.0 154.782 3.040 -999.990 -999.990 1.548 ..P WKT 2010 12 20 03 49 55 31.3200 -97.3300 251.000 30.0 158.503 2.900 -999.990 -999.990 1.585 ..P WKT 2010 12 20 03 54 55 31.3200 -97.3300 251.000 122.0 161.284 3.720 -999.990 -999.990 1.613 ..P WKT 2010 12 20 03 59 55 31.3200 -97.3300 251.000 457.0 151.058 3.950 -999.990 -999.990 1.511 ..P WKT 2010 12 20 04 04 55 31.3200 -97.3300 251.000 30.0 167.115 3.730 -999.990 -999.990 1.671 ..P WKT 2010 12 20 04 09 55 31.3200 -97.3300 251.000 122.0 160.339 2.930 -999.990 -999.990 1.603 ..P WKT 2010 12 20 04 14 55 31.3200 -97.3300 251.000 457.0 143.998 3.680 -999.990 -999.990 1.440 ..P WKT 2010 12 20 04 24 55 31.3200 -97.3300 251.000 30.0 159.088 3.420 -999.990 -999.990 1.591 ..P WKT 2010 12 20 04 29 55 31.3200 -97.3300 251.000 122.0 158.779 3.140 -999.990 -999.990 1.588 ..P WKT 2010 12 20 04 34 55 31.3200 -97.3300 251.000 457.0 147.306 4.290 -999.990 -999.990 1.473 ..P WKT 2010 12 20 04 39 55 31.3200 -97.3300 251.000 30.0 165.203 3.470 -999.990 -999.990 1.652 ..P WKT 2010 12 20 04 44 55 31.3200 -97.3300 251.000 122.0 158.780 3.640 -999.990 -999.990 1.588 ..P WKT 2010 12 20 04 49 55 31.3200 -97.3300 251.000 457.0 145.840 3.940 -999.990 -999.990 1.458 ..P WKT 2010 12 20 05 04 55 31.3200 -97.3300 251.000 30.0 162.139 4.930 -999.990 -999.990 1.621 ..P WKT 2010 12 20 05 09 55 31.3200 -97.3300 251.000 122.0 154.684 3.770 -999.990 -999.990 1.547 ..P WKT 2010 12 20 05 14 55 31.3200 -97.3300 251.000 457.0 150.685 3.590 -999.990 -999.990 1.507 ..P WKT 2010 12 20 05 19 55 31.3200 -97.3300 251.000 30.0 158.397 3.620 -999.990 -999.990 1.584 ..P WKT 2010 12 20 05 24 55 31.3200 -97.3300 251.000 122.0 150.804 3.420 -999.990 -999.990 1.508 ..P WKT 2010 12 20 05 29 55 31.3200 -97.3300 251.000 457.0 155.589 3.680 -999.990 -999.990 1.556 ..P WKT 2010 12 20 05 39 55 31.3200 -97.3300 251.000 30.0 154.150 3.340 -999.990 -999.990 1.542 ..P WKT 2010 12 20 05 44 55 31.3200 -97.3300 251.000 122.0 153.515 4.410 -999.990 -999.990 1.535 ..P WKT 2010 12 20 05 49 55 31.3200 -97.3300 251.000 457.0 155.811 5.540 -999.990 -999.990 1.558 ..P WKT 2010 12 20 05 54 55 31.3200 -97.3300 251.000 30.0 162.770 6.590 -999.990 -999.990 1.628 ..P WKT 2010 12 20 05 59 55 31.3200 -97.3300 251.000 122.0 154.276 5.960 -999.990 -999.990 1.543 ..P WKT 2010 12 20 06 04 55 31.3200 -97.3300 251.000 457.0 167.100 4.990 -999.990 -999.990 1.671 ..P WKT 2010 12 20 06 14 55 31.3200 -97.3300 251.000 30.0 154.008 4.810 -999.990 -999.990 1.540 ..P WKT 2010 12 20 06 19 55 31.3200 -97.3300 251.000 122.0 144.212 5.620 -999.990 -999.990 1.442 ..P WKT 2010 12 20 06 24 55 31.3200 -97.3300 251.000 457.0 176.815 6.800 -999.990 -999.990 1.768 ..P WKT 2010 12 20 06 29 55 31.3200 -97.3300 251.000 30.0 148.616 6.170 -999.990 -999.990 1.486 ..P WKT 2010 12 20 06 34 55 31.3200 -97.3300 251.000 122.0 144.416 5.380 -999.990 -999.990 1.444 ..P WKT 2010 12 20 06 39 55 31.3200 -97.3300 251.000 457.0 156.224 4.920 -999.990 -999.990 1.562 ..P WKT 2010 12 20 06 49 55 31.3200 -97.3300 251.000 30.0 148.052 4.930 -999.990 -999.990 1.481 ..P WKT 2010 12 20 06 54 55 31.3200 -97.3300 251.000 122.0 143.812 5.560 -999.990 -999.990 1.438 ..P WKT 2010 12 20 06 59 55 31.3200 -97.3300 251.000 457.0 160.928 6.460 -999.990 -999.990 1.609 ..P WKT 2010 12 20 07 04 55 31.3200 -97.3300 251.000 30.0 140.668 5.610 -999.990 -999.990 1.407 ..P WKT 2010 12 20 07 09 55 31.3200 -97.3300 251.000 122.0 141.498 4.420 -999.990 -999.990 1.415 ..P WKT 2010 12 20 07 14 55 31.3200 -97.3300 251.000 457.0 165.566 5.520 -999.990 -999.990 1.656 ..P WKT 2010 12 20 07 24 55 31.3200 -97.3300 251.000 30.0 145.747 4.640 -999.990 -999.990 1.457 ..P WKT 2010 12 20 07 29 55 31.3200 -97.3300 251.000 122.0 136.043 3.840 -999.990 -999.990 1.360 ..P WKT 2010 12 20 07 34 55 31.3200 -97.3300 251.000 457.0 159.208 4.640 -999.990 -999.990 1.592 ..P WKT 2010 12 20 07 39 55 31.3200 -97.3300 251.000 30.0 151.642 4.940 -999.990 -999.990 1.516 ..P WKT 2010 12 20 07 44 55 31.3200 -97.3300 251.000 122.0 143.538 4.470 -999.990 -999.990 1.435 ..P WKT 2010 12 20 07 49 55 31.3200 -97.3300 251.000 457.0 158.426 4.850 -999.990 -999.990 1.584 ..P WKT 2010 12 20 07 59 55 31.3200 -97.3300 251.000 30.0 146.284 4.510 -999.990 -999.990 1.463 ..P WKT 2010 12 20 08 04 55 31.3200 -97.3300 251.000 122.0 150.002 5.510 -999.990 -999.990 1.500 ..P WKT 2010 12 20 08 09 55 31.3200 -97.3300 251.000 457.0 158.135 4.750 -999.990 -999.990 1.581 ..P WKT 2010 12 20 08 14 55 31.3200 -97.3300 251.000 30.0 155.568 4.920 -999.990 -999.990 1.556 ..P WKT 2010 12 20 08 19 55 31.3200 -97.3300 251.000 122.0 149.387 5.430 -999.990 -999.990 1.494 ..P WKT 2010 12 20 08 24 55 31.3200 -97.3300 251.000 457.0 170.238 4.950 -999.990 -999.990 1.702 ..P WKT 2010 12 20 08 34 55 31.3200 -97.3300 251.000 30.0 154.892 5.500 -999.990 -999.990 1.549 ..P WKT 2010 12 20 08 39 55 31.3200 -97.3300 251.000 122.0 154.158 5.600 -999.990 -999.990 1.542 ..P WKT 2010 12 20 08 44 55 31.3200 -97.3300 251.000 457.0 167.753 5.960 -999.990 -999.990 1.678 ..P WKT 2010 12 20 08 49 55 31.3200 -97.3300 251.000 30.0 150.548 5.430 -999.990 -999.990 1.505 ..P WKT 2010 12 20 08 54 55 31.3200 -97.3300 251.000 122.0 148.474 5.370 -999.990 -999.990 1.485 ..P WKT 2010 12 20 08 59 55 31.3200 -97.3300 251.000 457.0 168.371 5.910 -999.990 -999.990 1.684 ..P WKT 2010 12 20 09 09 55 31.3200 -97.3300 251.000 30.0 155.994 5.790 -999.990 -999.990 1.560 ..P WKT 2010 12 20 09 14 55 31.3200 -97.3300 251.000 122.0 146.625 5.630 -999.990 -999.990 1.466 ..P WKT 2010 12 20 09 19 55 31.3200 -97.3300 251.000 457.0 165.404 4.950 -999.990 -999.990 1.654 ..P WKT 2010 12 20 09 24 55 31.3200 -97.3300 251.000 30.0 148.524 4.930 -999.990 -999.990 1.485 ..P WKT 2010 12 20 09 29 55 31.3200 -97.3300 251.000 122.0 150.145 4.850 -999.990 -999.990 1.501 ..P WKT 2010 12 20 09 34 55 31.3200 -97.3300 251.000 457.0 167.458 4.990 -999.990 -999.990 1.675 ..P WKT 2010 12 20 09 44 55 31.3200 -97.3300 251.000 30.0 145.466 4.800 -999.990 -999.990 1.455 ..P WKT 2010 12 20 09 49 55 31.3200 -97.3300 251.000 122.0 155.924 4.650 -999.990 -999.990 1.559 ..P WKT 2010 12 20 09 54 55 31.3200 -97.3300 251.000 457.0 174.840 5.290 -999.990 -999.990 1.748 ..P WKT 2010 12 20 09 59 55 31.3200 -97.3300 251.000 30.0 149.737 4.890 -999.990 -999.990 1.497 ..P WKT 2010 12 20 10 04 55 31.3200 -97.3300 251.000 122.0 151.609 5.650 -999.990 -999.990 1.516 ..P WKT 2010 12 20 10 09 55 31.3200 -97.3300 251.000 457.0 174.695 4.930 -999.990 -999.990 1.747 ..P WKT 2010 12 20 10 19 55 31.3200 -97.3300 251.000 30.0 147.386 4.880 -999.990 -999.990 1.474 ..P WKT 2010 12 20 10 24 55 31.3200 -97.3300 251.000 122.0 151.102 6.620 -999.990 -999.990 1.511 ..P WKT 2010 12 20 10 29 55 31.3200 -97.3300 251.000 457.0 171.476 5.170 -999.990 -999.990 1.715 ..P WKT 2010 12 20 10 34 55 31.3200 -97.3300 251.000 30.0 150.741 5.310 -999.990 -999.990 1.507 ..P WKT 2010 12 20 10 39 55 31.3200 -97.3300 251.000 122.0 152.308 5.710 -999.990 -999.990 1.523 ..P WKT 2010 12 20 10 44 55 31.3200 -97.3300 251.000 457.0 188.283 5.790 -999.990 -999.990 1.883 ..P WKT 2010 12 20 10 54 55 31.3200 -97.3300 251.000 30.0 150.636 5.430 -999.990 -999.990 1.506 ..P WKT 2010 12 20 10 59 55 31.3200 -97.3300 251.000 122.0 153.356 6.020 -999.990 -999.990 1.534 ..P WKT 2010 12 20 11 04 55 31.3200 -97.3300 251.000 457.0 185.933 5.720 -999.990 -999.990 1.859 ..P WKT 2010 12 20 11 09 55 31.3200 -97.3300 251.000 30.0 150.730 5.500 -999.990 -999.990 1.507 ..P WKT 2010 12 20 11 14 55 31.3200 -97.3300 251.000 122.0 155.335 5.220 -999.990 -999.990 1.553 ..P WKT 2010 12 20 11 19 55 31.3200 -97.3300 251.000 457.0 196.536 5.170 -999.990 -999.990 1.965 ..P WKT 2010 12 20 11 29 55 31.3200 -97.3300 251.000 30.0 155.190 5.280 -999.990 -999.990 1.552 ..P WKT 2010 12 20 11 34 55 31.3200 -97.3300 251.000 122.0 159.558 5.510 -999.990 -999.990 1.596 ..P WKT 2010 12 20 11 39 55 31.3200 -97.3300 251.000 457.0 190.583 5.540 -999.990 -999.990 1.906 ..P WKT 2010 12 20 11 44 55 31.3200 -97.3300 251.000 30.0 150.525 5.720 -999.990 -999.990 1.505 ..P WKT 2010 12 20 11 49 55 31.3200 -97.3300 251.000 122.0 164.859 6.210 -999.990 -999.990 1.649 ..P WKT 2010 12 20 12 09 55 31.3200 -97.3300 251.000 457.0 183.242 6.320 -999.990 -999.990 1.832 ..P WKT 2010 12 20 12 10 25 31.3200 -97.3300 251.000 457.0 179.444 6.650 -999.990 -999.990 1.794 ..P WKT 2010 12 20 12 10 55 31.3200 -97.3300 251.000 457.0 180.630 7.090 -999.990 -999.990 1.806 ..P WKT 2010 12 20 12 11 25 31.3200 -97.3300 251.000 457.0 185.319 6.340 -999.990 -999.990 1.853 ..P WKT 2010 12 20 12 11 55 31.3200 -97.3300 251.000 457.0 187.987 6.520 -999.990 -999.990 1.880 ..P WKT 2010 12 20 12 12 25 31.3200 -97.3300 251.000 457.0 185.940 6.920 -999.990 -999.990 1.859 ..P WKT 2010 12 20 12 12 55 31.3200 -97.3300 251.000 457.0 181.872 6.960 -999.990 -999.990 1.819 ..P WKT 2010 12 20 12 13 25 31.3200 -97.3300 251.000 457.0 184.406 6.340 -999.990 -999.990 1.844 ..P WKT 2010 12 20 12 13 55 31.3200 -97.3300 251.000 457.0 181.550 6.900 -999.990 -999.990 1.816 ..P WKT 2010 12 20 12 14 25 31.3200 -97.3300 251.000 457.0 181.928 7.180 -999.990 -999.990 1.819 ..P WKT 2010 12 20 12 14 55 31.3200 -97.3300 251.000 457.0 186.078 6.490 -999.990 -999.990 1.861 ..P WKT 2010 12 20 12 19 55 31.3200 -97.3300 251.000 30.0 155.638 6.270 -999.990 -999.990 1.556 ..P WKT 2010 12 20 12 24 55 31.3200 -97.3300 251.000 122.0 168.981 6.300 -999.990 -999.990 1.690 ..P WKT 2010 12 20 12 29 55 31.3200 -97.3300 251.000 457.0 180.305 6.290 -999.990 -999.990 1.803 ..P WKT 2010 12 20 12 34 55 31.3200 -97.3300 251.000 30.0 157.811 5.800 -999.990 -999.990 1.578 ..P WKT 2010 12 20 12 39 55 31.3200 -97.3300 251.000 122.0 171.560 6.170 -999.990 -999.990 1.716 ..P WKT 2010 12 20 12 44 55 31.3200 -97.3300 251.000 457.0 181.807 5.690 -999.990 -999.990 1.818 ..P WKT 2010 12 20 12 54 55 31.3200 -97.3300 251.000 30.0 171.987 5.820 -999.990 -999.990 1.720 ..P WKT 2010 12 20 12 59 55 31.3200 -97.3300 251.000 122.0 177.793 5.680 -999.990 -999.990 1.778 ..P WKT 2010 12 20 13 04 55 31.3200 -97.3300 251.000 457.0 176.321 6.270 -999.990 -999.990 1.763 ..P WKT 2010 12 20 13 09 55 31.3200 -97.3300 251.000 30.0 170.267 5.730 -999.990 -999.990 1.703 ..P WKT 2010 12 20 13 14 55 31.3200 -97.3300 251.000 122.0 172.568 5.960 -999.990 -999.990 1.726 ..P WKT 2010 12 20 13 19 55 31.3200 -97.3300 251.000 457.0 181.070 6.080 -999.990 -999.990 1.811 ..P WKT 2010 12 20 13 29 55 31.3200 -97.3300 251.000 30.0 176.220 6.120 -999.990 -999.990 1.762 ..P WKT 2010 12 20 13 34 55 31.3200 -97.3300 251.000 122.0 174.325 6.130 -999.990 -999.990 1.743 ..P WKT 2010 12 20 13 39 55 31.3200 -97.3300 251.000 457.0 180.517 5.990 -999.990 -999.990 1.805 ..P WKT 2010 12 20 13 44 55 31.3200 -97.3300 251.000 30.0 182.935 5.940 -999.990 -999.990 1.829 ..P WKT 2010 12 20 13 49 55 31.3200 -97.3300 251.000 122.0 184.814 6.440 -999.990 -999.990 1.848 ..P WKT 2010 12 20 13 54 55 31.3200 -97.3300 251.000 457.0 188.850 7.240 -999.990 -999.990 1.889 ..P WKT 2010 12 20 14 04 55 31.3200 -97.3300 251.000 30.0 178.202 5.970 -999.990 -999.990 1.782 ..P WKT 2010 12 20 14 09 55 31.3200 -97.3300 251.000 122.0 185.494 5.890 -999.990 -999.990 1.855 ..P WKT 2010 12 20 14 14 55 31.3200 -97.3300 251.000 457.0 177.414 6.120 -999.990 -999.990 1.774 ..P WKT 2010 12 20 14 19 55 31.3200 -97.3300 251.000 30.0 184.167 5.960 -999.990 -999.990 1.842 ..P WKT 2010 12 20 14 24 55 31.3200 -97.3300 251.000 122.0 189.032 6.190 -999.990 -999.990 1.890 ..P WKT 2010 12 20 14 29 55 31.3200 -97.3300 251.000 457.0 176.099 6.260 -999.990 -999.990 1.761 ..P WKT 2010 12 20 14 39 55 31.3200 -97.3300 251.000 30.0 185.155 5.990 -999.990 -999.990 1.852 ..P WKT 2010 12 20 14 44 55 31.3200 -97.3300 251.000 122.0 187.998 6.050 -999.990 -999.990 1.880 ..P WKT 2010 12 20 14 49 55 31.3200 -97.3300 251.000 457.0 182.209 6.510 -999.990 -999.990 1.822 ..P WKT 2010 12 20 14 54 55 31.3200 -97.3300 251.000 30.0 190.447 7.390 -999.990 -999.990 1.904 ..P WKT 2010 12 20 14 59 55 31.3200 -97.3300 251.000 122.0 190.323 6.780 -999.990 -999.990 1.903 ..P WKT 2010 12 20 15 04 55 31.3200 -97.3300 251.000 457.0 174.284 8.410 -999.990 -999.990 1.743 ..P WKT 2010 12 20 15 14 55 31.3200 -97.3300 251.000 30.0 184.942 7.450 -999.990 -999.990 1.849 ..P WKT 2010 12 20 15 19 55 31.3200 -97.3300 251.000 122.0 184.394 7.340 -999.990 -999.990 1.844 ..P WKT 2010 12 20 15 24 55 31.3200 -97.3300 251.000 457.0 164.152 6.770 -999.990 -999.990 1.642 ..P WKT 2010 12 20 15 29 55 31.3200 -97.3300 251.000 30.0 188.695 6.580 -999.990 -999.990 1.887 ..P WKT 2010 12 20 15 34 55 31.3200 -97.3300 251.000 122.0 188.957 6.390 -999.990 -999.990 1.890 ..P WKT 2010 12 20 15 39 55 31.3200 -97.3300 251.000 457.0 178.156 6.680 -999.990 -999.990 1.782 ..P WKT 2010 12 20 15 49 55 31.3200 -97.3300 251.000 30.0 192.228 6.100 -999.990 -999.990 1.922 ..P WKT 2010 12 20 15 54 55 31.3200 -97.3300 251.000 122.0 191.738 6.520 -999.990 -999.990 1.917 ..P WKT 2010 12 20 15 59 55 31.3200 -97.3300 251.000 457.0 168.445 6.800 -999.990 -999.990 1.684 ..P WKT 2010 12 20 16 04 55 31.3200 -97.3300 251.000 30.0 197.505 6.960 -999.990 -999.990 1.975 ..P WKT 2010 12 20 16 09 55 31.3200 -97.3300 251.000 122.0 193.371 6.560 -999.990 -999.990 1.934 ..P WKT 2010 12 20 16 14 55 31.3200 -97.3300 251.000 457.0 163.869 6.300 -999.990 -999.990 1.639 ..P WKT 2010 12 20 16 24 55 31.3200 -97.3300 251.000 30.0 199.498 6.220 -999.990 -999.990 1.995 ..P WKT 2010 12 20 16 29 55 31.3200 -97.3300 251.000 122.0 199.856 7.640 -999.990 -999.990 1.999 ..P WKT 2010 12 20 16 34 55 31.3200 -97.3300 251.000 457.0 166.879 6.850 -999.990 -999.990 1.669 ..P WKT 2010 12 20 16 39 55 31.3200 -97.3300 251.000 30.0 195.984 6.760 -999.990 -999.990 1.960 ..P WKT 2010 12 20 16 44 55 31.3200 -97.3300 251.000 122.0 195.263 6.480 -999.990 -999.990 1.953 ..P WKT 2010 12 20 16 49 55 31.3200 -97.3300 251.000 457.0 193.462 7.210 -999.990 -999.990 1.935 ..P WKT 2010 12 20 17 04 55 31.3200 -97.3300 251.000 30.0 189.383 6.350 -999.990 -999.990 1.894 ..P WKT 2010 12 20 17 09 55 31.3200 -97.3300 251.000 122.0 192.834 6.410 -999.990 -999.990 1.928 ..P WKT 2010 12 20 17 14 55 31.3200 -97.3300 251.000 457.0 193.585 7.020 -999.990 -999.990 1.936 ..P WKT 2010 12 20 17 19 55 31.3200 -97.3300 251.000 30.0 194.741 7.570 -999.990 -999.990 1.947 ..P WKT 2010 12 20 17 24 55 31.3200 -97.3300 251.000 122.0 197.384 6.890 -999.990 -999.990 1.974 ..P WKT 2010 12 20 17 29 55 31.3200 -97.3300 251.000 457.0 167.757 7.690 -999.990 -999.990 1.678 ..P WKT 2010 12 20 17 39 55 31.3200 -97.3300 251.000 30.0 201.772 6.900 -999.990 -999.990 2.018 ..P WKT 2010 12 20 17 44 55 31.3200 -97.3300 251.000 122.0 203.037 6.970 -999.990 -999.990 2.030 ..P WKT 2010 12 20 17 49 55 31.3200 -97.3300 251.000 457.0 183.913 8.120 -999.990 -999.990 1.839 ..P WKT 2010 12 20 17 54 55 31.3200 -97.3300 251.000 30.0 205.704 7.230 -999.990 -999.990 2.057 ..P WKT 2010 12 20 17 59 55 31.3200 -97.3300 251.000 122.0 208.859 7.460 -999.990 -999.990 2.089 ..P WKT 2010 12 20 18 04 55 31.3200 -97.3300 251.000 457.0 194.595 7.660 -999.990 -999.990 1.946 ..P WKT 2010 12 20 18 14 55 31.3200 -97.3300 251.000 30.0 210.497 7.080 -999.990 -999.990 2.105 ..P WKT 2010 12 20 18 19 55 31.3200 -97.3300 251.000 122.0 207.981 7.740 -999.990 -999.990 2.080 ..P WKT 2010 12 20 18 24 55 31.3200 -97.3300 251.000 457.0 188.988 7.450 -999.990 -999.990 1.890 ..P WKT 2010 12 20 18 29 55 31.3200 -97.3300 251.000 30.0 201.598 7.460 -999.990 -999.990 2.016 ..P WKT 2010 12 20 18 34 55 31.3200 -97.3300 251.000 122.0 198.272 7.140 -999.990 -999.990 1.983 ..P WKT 2010 12 20 18 39 55 31.3200 -97.3300 251.000 457.0 190.892 6.750 -999.990 -999.990 1.909 ..P WKT 2010 12 20 18 49 55 31.3200 -97.3300 251.000 30.0 198.403 6.970 -999.990 -999.990 1.984 ..P WKT 2010 12 20 18 54 55 31.3200 -97.3300 251.000 122.0 208.430 7.170 -999.990 -999.990 2.084 ..P WKT 2010 12 20 18 59 55 31.3200 -97.3300 251.000 457.0 161.448 7.640 -999.990 -999.990 1.614 ..P WKT 2010 12 20 19 04 55 31.3200 -97.3300 251.000 30.0 204.709 7.140 -999.990 -999.990 2.047 ..P WKT 2010 12 20 19 09 55 31.3200 -97.3300 251.000 122.0 202.848 6.890 -999.990 -999.990 2.028 ..P WKT 2010 12 20 19 14 55 31.3200 -97.3300 251.000 457.0 192.611 6.880 -999.990 -999.990 1.926 ..P WKT 2010 12 20 19 24 55 31.3200 -97.3300 251.000 30.0 199.467 7.380 -999.990 -999.990 1.995 ..P WKT 2010 12 20 19 29 55 31.3200 -97.3300 251.000 122.0 206.022 6.910 -999.990 -999.990 2.060 ..P WKT 2010 12 20 19 34 55 31.3200 -97.3300 251.000 457.0 198.254 6.870 -999.990 -999.990 1.983 ..P WKT 2010 12 20 19 39 55 31.3200 -97.3300 251.000 30.0 203.188 6.890 -999.990 -999.990 2.032 ..P WKT 2010 12 20 19 44 55 31.3200 -97.3300 251.000 122.0 207.852 7.140 -999.990 -999.990 2.079 ..P WKT 2010 12 20 19 49 55 31.3200 -97.3300 251.000 457.0 199.543 6.940 -999.990 -999.990 1.995 ..P WKT 2010 12 20 19 59 55 31.3200 -97.3300 251.000 30.0 206.748 7.040 -999.990 -999.990 2.067 ..P WKT 2010 12 20 20 04 55 31.3200 -97.3300 251.000 122.0 208.343 8.480 -999.990 -999.990 2.083 ..P WKT 2010 12 20 20 09 55 31.3200 -97.3300 251.000 457.0 199.666 7.160 -999.990 -999.990 1.997 ..P WKT 2010 12 20 20 14 55 31.3200 -97.3300 251.000 30.0 204.234 7.050 -999.990 -999.990 2.042 ..P WKT 2010 12 20 20 19 55 31.3200 -97.3300 251.000 122.0 208.127 7.620 -999.990 -999.990 2.081 ..P WKT 2010 12 20 20 24 55 31.3200 -97.3300 251.000 457.0 203.369 6.870 -999.990 -999.990 2.034 ..P WKT 2010 12 20 20 34 55 31.3200 -97.3300 251.000 30.0 210.750 7.150 -999.990 -999.990 2.107 ..P WKT 2010 12 20 20 39 55 31.3200 -97.3300 251.000 122.0 211.669 7.040 -999.990 -999.990 2.117 ..P WKT 2010 12 20 20 44 55 31.3200 -97.3300 251.000 457.0 149.861 8.670 -999.990 -999.990 1.499 ..P WKT 2010 12 20 20 49 55 31.3200 -97.3300 251.000 30.0 211.751 7.800 -999.990 -999.990 2.118 ..P WKT 2010 12 20 20 54 55 31.3200 -97.3300 251.000 122.0 213.617 7.260 -999.990 -999.990 2.136 ..P WKT 2010 12 20 20 59 55 31.3200 -97.3300 251.000 457.0 194.526 7.050 -999.990 -999.990 1.945 ..P WKT 2010 12 20 21 09 55 31.3200 -97.3300 251.000 30.0 209.229 7.200 -999.990 -999.990 2.092 ..P WKT 2010 12 20 21 14 55 31.3200 -97.3300 251.000 122.0 205.571 7.160 -999.990 -999.990 2.056 ..P WKT 2010 12 20 21 19 55 31.3200 -97.3300 251.000 457.0 185.010 7.340 -999.990 -999.990 1.850 ..P WKT 2010 12 20 21 24 55 31.3200 -97.3300 251.000 30.0 210.829 7.250 -999.990 -999.990 2.108 ..P WKT 2010 12 20 21 29 55 31.3200 -97.3300 251.000 122.0 215.825 7.410 -999.990 -999.990 2.158 ..P WKT 2010 12 20 21 34 55 31.3200 -97.3300 251.000 457.0 182.009 7.590 -999.990 -999.990 1.820 ..P WKT 2010 12 20 21 44 55 31.3200 -97.3300 251.000 30.0 211.591 8.500 -999.990 -999.990 2.116 ..P WKT 2010 12 20 21 49 55 31.3200 -97.3300 251.000 122.0 212.917 7.570 -999.990 -999.990 2.129 ..P WKT 2010 12 20 21 54 55 31.3200 -97.3300 251.000 457.0 215.190 7.570 -999.990 -999.990 2.152 ..P WKT 2010 12 20 21 59 55 31.3200 -97.3300 251.000 30.0 203.937 7.720 -999.990 -999.990 2.039 ..P WKT 2010 12 20 22 04 55 31.3200 -97.3300 251.000 122.0 203.504 7.620 -999.990 -999.990 2.035 ..P WKT 2010 12 20 22 09 55 31.3200 -97.3300 251.000 457.0 210.105 7.930 -999.990 -999.990 2.101 ..P WKT 2010 12 20 22 19 55 31.3200 -97.3300 251.000 30.0 206.496 7.910 -999.990 -999.990 2.065 ..P WKT 2010 12 20 22 24 55 31.3200 -97.3300 251.000 122.0 205.213 8.110 -999.990 -999.990 2.052 ..P WKT 2010 12 20 22 29 55 31.3200 -97.3300 251.000 457.0 196.353 7.610 -999.990 -999.990 1.964 ..P WKT 2010 12 20 22 34 55 31.3200 -97.3300 251.000 30.0 204.540 7.880 -999.990 -999.990 2.045 ..P WKT 2010 12 20 22 39 55 31.3200 -97.3300 251.000 122.0 209.209 7.950 -999.990 -999.990 2.092 ..P WKT 2010 12 20 22 44 55 31.3200 -97.3300 251.000 457.0 201.973 7.770 -999.990 -999.990 2.020 ..P WKT 2010 12 20 22 54 55 31.3200 -97.3300 251.000 30.0 206.055 7.430 -999.990 -999.990 2.061 ..P WKT 2010 12 20 22 59 55 31.3200 -97.3300 251.000 122.0 202.220 7.870 -999.990 -999.990 2.022 ..P WKT 2010 12 20 23 04 55 31.3200 -97.3300 251.000 457.0 201.903 7.960 -999.990 -999.990 2.019 ..P WKT 2010 12 20 23 09 55 31.3200 -97.3300 251.000 30.0 199.150 7.940 -999.990 -999.990 1.992 ..P WKT 2010 12 20 23 14 55 31.3200 -97.3300 251.000 122.0 200.998 8.180 -999.990 -999.990 2.010 ..P WKT 2010 12 20 23 19 55 31.3200 -97.3300 251.000 457.0 177.675 8.000 -999.990 -999.990 1.777 ..P WKT 2010 12 20 23 29 55 31.3200 -97.3300 251.000 30.0 211.013 8.350 -999.990 -999.990 2.110 ..P WKT 2010 12 20 23 34 55 31.3200 -97.3300 251.000 122.0 211.919 7.720 -999.990 -999.990 2.119 ..P WKT 2010 12 20 23 39 55 31.3200 -97.3300 251.000 457.0 187.922 7.780 -999.990 -999.990 1.879 ..P WKT 2010 12 20 23 44 55 31.3200 -97.3300 251.000 30.0 211.295 7.900 -999.990 -999.990 2.113 ..P WKT 2010 12 20 23 49 55 31.3200 -97.3300 251.000 122.0 208.412 8.160 -999.990 -999.990 2.084 ..P WKT 2010 12 21 00 09 55 31.3200 -97.3300 251.000 457.0 160.088 7.620 -999.990 -999.990 1.601 ..P WKT 2010 12 21 00 10 25 31.3200 -97.3300 251.000 457.0 158.665 7.410 -999.990 -999.990 1.587 ..P WKT 2010 12 21 00 10 55 31.3200 -97.3300 251.000 457.0 156.025 7.870 -999.990 -999.990 1.560 ..P WKT 2010 12 21 00 11 25 31.3200 -97.3300 251.000 457.0 155.956 7.640 -999.990 -999.990 1.560 ..P WKT 2010 12 21 00 11 55 31.3200 -97.3300 251.000 457.0 157.239 7.740 -999.990 -999.990 1.572 ..P WKT 2010 12 21 00 12 25 31.3200 -97.3300 251.000 457.0 159.063 7.640 -999.990 -999.990 1.591 ..P WKT 2010 12 21 00 12 55 31.3200 -97.3300 251.000 457.0 161.834 7.570 -999.990 -999.990 1.618 ..P WKT 2010 12 21 00 13 25 31.3200 -97.3300 251.000 457.0 159.330 7.580 -999.990 -999.990 1.593 ..P WKT 2010 12 21 00 13 55 31.3200 -97.3300 251.000 457.0 160.478 7.630 -999.990 -999.990 1.605 ..P WKT 2010 12 21 00 14 25 31.3200 -97.3300 251.000 457.0 153.916 7.790 -999.990 -999.990 1.539 ..P WKT 2010 12 21 00 14 55 31.3200 -97.3300 251.000 457.0 154.929 7.800 -999.990 -999.990 1.549 ..P WKT 2010 12 21 00 19 55 31.3200 -97.3300 251.000 30.0 195.477 7.520 -999.990 -999.990 1.955 ..P WKT 2010 12 21 00 24 55 31.3200 -97.3300 251.000 122.0 189.770 7.430 -999.990 -999.990 1.898 ..P WKT 2010 12 21 00 29 55 31.3200 -97.3300 251.000 457.0 187.581 7.740 -999.990 -999.990 1.876 ..P WKT 2010 12 21 00 34 55 31.3200 -97.3300 251.000 30.0 188.095 7.430 -999.990 -999.990 1.881 ..P WKT 2010 12 21 00 39 55 31.3200 -97.3300 251.000 122.0 195.498 7.410 -999.990 -999.990 1.955 ..P WKT 2010 12 21 00 44 55 31.3200 -97.3300 251.000 457.0 184.530 7.290 -999.990 -999.990 1.845 ..P WKT 2010 12 21 00 54 55 31.3200 -97.3300 251.000 30.0 189.858 7.290 -999.990 -999.990 1.899 ..P WKT 2010 12 21 00 59 55 31.3200 -97.3300 251.000 122.0 187.653 7.580 -999.990 -999.990 1.877 ..P WKT 2010 12 21 01 04 55 31.3200 -97.3300 251.000 457.0 194.758 7.390 -999.990 -999.990 1.948 ..P WKT 2010 12 21 01 09 55 31.3200 -97.3300 251.000 30.0 185.808 7.480 -999.990 -999.990 1.858 ..P WKT 2010 12 21 01 14 55 31.3200 -97.3300 251.000 122.0 181.852 7.570 -999.990 -999.990 1.819 ..P WKT 2010 12 21 01 19 55 31.3200 -97.3300 251.000 457.0 192.997 7.560 -999.990 -999.990 1.930 ..P WKT 2010 12 21 01 29 55 31.3200 -97.3300 251.000 30.0 187.859 7.540 -999.990 -999.990 1.879 ..P WKT 2010 12 21 01 34 55 31.3200 -97.3300 251.000 122.0 181.964 7.930 -999.990 -999.990 1.820 ..P WKT 2010 12 21 01 39 55 31.3200 -97.3300 251.000 457.0 189.403 7.860 -999.990 -999.990 1.894 ..P WKT 2010 12 21 01 44 55 31.3200 -97.3300 251.000 30.0 177.721 7.290 -999.990 -999.990 1.777 ..P WKT 2010 12 21 01 49 55 31.3200 -97.3300 251.000 122.0 173.043 7.170 -999.990 -999.990 1.730 ..P WKT 2010 12 21 01 54 55 31.3200 -97.3300 251.000 457.0 191.918 7.750 -999.990 -999.990 1.919 ..P WKT 2010 12 21 02 04 55 31.3200 -97.3300 251.000 30.0 168.114 6.930 -999.990 -999.990 1.681 ..P WKT 2010 12 21 02 09 55 31.3200 -97.3300 251.000 122.0 171.588 6.780 -999.990 -999.990 1.716 ..P WKT 2010 12 21 02 14 55 31.3200 -97.3300 251.000 457.0 181.783 6.940 -999.990 -999.990 1.818 ..P WKT 2010 12 21 02 19 55 31.3200 -97.3300 251.000 30.0 174.231 7.950 -999.990 -999.990 1.742 ..P WKT 2010 12 21 02 24 55 31.3200 -97.3300 251.000 122.0 172.327 6.890 -999.990 -999.990 1.723 ..P WKT 2010 12 21 02 29 55 31.3200 -97.3300 251.000 457.0 191.380 6.730 -999.990 -999.990 1.914 ..P WKT 2010 12 21 02 39 55 31.3200 -97.3300 251.000 30.0 169.421 7.420 -999.990 -999.990 1.694 ..P WKT 2010 12 21 02 44 55 31.3200 -97.3300 251.000 122.0 170.588 7.230 -999.990 -999.990 1.706 ..P WKT 2010 12 21 02 49 55 31.3200 -97.3300 251.000 457.0 191.079 7.000 -999.990 -999.990 1.911 ..P WKT 2010 12 21 02 54 55 31.3200 -97.3300 251.000 30.0 175.336 6.940 -999.990 -999.990 1.753 ..P WKT 2010 12 21 02 59 55 31.3200 -97.3300 251.000 122.0 176.500 7.170 -999.990 -999.990 1.765 ..P WKT 2010 12 21 03 04 55 31.3200 -97.3300 251.000 457.0 200.729 7.880 -999.990 -999.990 2.007 ..P WKT 2010 12 21 03 14 55 31.3200 -97.3300 251.000 30.0 171.184 7.120 -999.990 -999.990 1.712 ..P WKT 2010 12 21 03 19 55 31.3200 -97.3300 251.000 122.0 184.446 7.240 -999.990 -999.990 1.844 ..P WKT 2010 12 21 03 24 55 31.3200 -97.3300 251.000 457.0 199.845 7.120 -999.990 -999.990 1.998 ..P WKT 2010 12 21 03 29 55 31.3200 -97.3300 251.000 30.0 182.290 6.930 -999.990 -999.990 1.823 ..P WKT 2010 12 21 03 34 55 31.3200 -97.3300 251.000 122.0 194.200 7.020 -999.990 -999.990 1.942 ..P WKT 2010 12 21 03 39 55 31.3200 -97.3300 251.000 457.0 203.428 6.870 -999.990 -999.990 2.034 ..P WKT 2010 12 21 03 49 55 31.3200 -97.3300 251.000 30.0 186.624 6.590 -999.990 -999.990 1.866 ..P WKT 2010 12 21 03 54 55 31.3200 -97.3300 251.000 122.0 195.387 6.790 -999.990 -999.990 1.954 ..P WKT 2010 12 21 03 59 55 31.3200 -97.3300 251.000 457.0 184.757 7.060 -999.990 -999.990 1.848 ..P WKT 2010 12 21 04 04 55 31.3200 -97.3300 251.000 30.0 189.238 6.950 -999.990 -999.990 1.892 ..P WKT 2010 12 21 04 09 55 31.3200 -97.3300 251.000 122.0 189.040 6.870 -999.990 -999.990 1.890 ..P WKT 2010 12 21 04 14 55 31.3200 -97.3300 251.000 457.0 178.285 6.320 -999.990 -999.990 1.783 ..P WKT 2010 12 21 04 24 55 31.3200 -97.3300 251.000 30.0 183.675 6.510 -999.990 -999.990 1.837 ..P WKT 2010 12 21 04 29 55 31.3200 -97.3300 251.000 122.0 184.050 7.030 -999.990 -999.990 1.841 ..P WKT 2010 12 21 04 34 55 31.3200 -97.3300 251.000 457.0 175.482 6.730 -999.990 -999.990 1.755 ..P WKT 2010 12 21 04 39 55 31.3200 -97.3300 251.000 30.0 187.069 6.660 -999.990 -999.990 1.871 ..P WKT 2010 12 21 04 44 55 31.3200 -97.3300 251.000 122.0 183.708 6.860 -999.990 -999.990 1.837 ..P WKT 2010 12 21 04 49 55 31.3200 -97.3300 251.000 457.0 172.212 6.960 -999.990 -999.990 1.722 ..P WKT 2010 12 21 05 04 55 31.3200 -97.3300 251.000 30.0 179.475 6.810 -999.990 -999.990 1.795 ..P WKT 2010 12 21 05 09 55 31.3200 -97.3300 251.000 122.0 187.379 6.580 -999.990 -999.990 1.874 ..P WKT 2010 12 21 05 14 55 31.3200 -97.3300 251.000 457.0 162.775 6.740 -999.990 -999.990 1.628 ..P WKT 2010 12 21 05 19 55 31.3200 -97.3300 251.000 30.0 171.745 6.290 -999.990 -999.990 1.717 ..P WKT 2010 12 21 05 24 55 31.3200 -97.3300 251.000 122.0 172.454 6.220 -999.990 -999.990 1.725 ..P WKT 2010 12 21 05 29 55 31.3200 -97.3300 251.000 457.0 167.839 7.130 -999.990 -999.990 1.678 ..P WKT 2010 12 21 05 39 55 31.3200 -97.3300 251.000 30.0 172.767 5.810 -999.990 -999.990 1.728 ..P WKT 2010 12 21 05 44 55 31.3200 -97.3300 251.000 122.0 166.740 6.060 -999.990 -999.990 1.667 ..P WKT 2010 12 21 05 49 55 31.3200 -97.3300 251.000 457.0 168.030 6.490 -999.990 -999.990 1.680 ..P WKT 2010 12 21 05 54 55 31.3200 -97.3300 251.000 30.0 162.805 5.900 -999.990 -999.990 1.628 ..P WKT 2010 12 21 05 59 55 31.3200 -97.3300 251.000 122.0 160.507 6.390 -999.990 -999.990 1.605 ..P WKT 2010 12 21 06 04 55 31.3200 -97.3300 251.000 457.0 157.412 6.310 -999.990 -999.990 1.574 ..P WKT 2010 12 21 06 14 55 31.3200 -97.3300 251.000 30.0 161.701 5.590 -999.990 -999.990 1.617 ..P WKT 2010 12 21 06 19 55 31.3200 -97.3300 251.000 122.0 159.253 6.800 -999.990 -999.990 1.593 ..P WKT 2010 12 21 06 24 55 31.3200 -97.3300 251.000 457.0 158.665 5.710 -999.990 -999.990 1.587 ..P WKT 2010 12 21 06 29 55 31.3200 -97.3300 251.000 30.0 159.405 7.620 -999.990 -999.990 1.594 ..P WKT 2010 12 21 06 34 55 31.3200 -97.3300 251.000 122.0 162.266 5.670 -999.990 -999.990 1.623 ..P WKT 2010 12 21 06 39 55 31.3200 -97.3300 251.000 457.0 154.516 5.420 -999.990 -999.990 1.545 ..P WKT 2010 12 21 06 49 55 31.3200 -97.3300 251.000 30.0 165.238 5.560 -999.990 -999.990 1.652 ..P WKT 2010 12 21 06 54 55 31.3200 -97.3300 251.000 122.0 165.937 5.950 -999.990 -999.990 1.659 ..P WKT 2010 12 21 06 59 55 31.3200 -97.3300 251.000 457.0 166.900 5.580 -999.990 -999.990 1.669 ..P WKT 2010 12 21 07 04 55 31.3200 -97.3300 251.000 30.0 161.770 5.710 -999.990 -999.990 1.618 ..P WKT 2010 12 21 07 09 55 31.3200 -97.3300 251.000 122.0 167.502 6.210 -999.990 -999.990 1.675 ..P WKT 2010 12 21 07 14 55 31.3200 -97.3300 251.000 457.0 167.670 7.090 -999.990 -999.990 1.677 ..P WKT 2010 12 21 07 24 55 31.3200 -97.3300 251.000 30.0 164.357 6.850 -999.990 -999.990 1.644 ..P WKT 2010 12 21 07 29 55 31.3200 -97.3300 251.000 122.0 166.435 6.770 -999.990 -999.990 1.664 ..P WKT 2010 12 21 07 34 55 31.3200 -97.3300 251.000 457.0 169.570 6.440 -999.990 -999.990 1.696 ..P WKT 2010 12 21 07 39 55 31.3200 -97.3300 251.000 30.0 170.322 5.960 -999.990 -999.990 1.703 ..P WKT 2010 12 21 07 44 55 31.3200 -97.3300 251.000 122.0 164.729 5.780 -999.990 -999.990 1.647 ..P WKT 2010 12 21 07 49 55 31.3200 -97.3300 251.000 457.0 169.581 5.880 -999.990 -999.990 1.696 ..P WKT 2010 12 21 07 59 55 31.3200 -97.3300 251.000 30.0 160.007 5.570 -999.990 -999.990 1.600 ..P WKT 2010 12 21 08 04 55 31.3200 -97.3300 251.000 122.0 165.931 5.710 -999.990 -999.990 1.659 ..P WKT 2010 12 21 08 09 55 31.3200 -97.3300 251.000 457.0 160.233 5.900 -999.990 -999.990 1.602 ..P WKT 2010 12 21 08 14 55 31.3200 -97.3300 251.000 30.0 154.801 6.670 -999.990 -999.990 1.548 ..P WKT 2010 12 21 08 19 55 31.3200 -97.3300 251.000 122.0 156.895 6.280 -999.990 -999.990 1.569 ..P WKT 2010 12 21 08 24 55 31.3200 -97.3300 251.000 457.0 161.231 5.430 -999.990 -999.990 1.612 ..P WKT 2010 12 21 08 34 55 31.3200 -97.3300 251.000 30.0 159.120 5.530 -999.990 -999.990 1.591 ..P WKT 2010 12 21 08 39 55 31.3200 -97.3300 251.000 122.0 155.447 5.390 -999.990 -999.990 1.554 ..P WKT 2010 12 21 08 44 55 31.3200 -97.3300 251.000 457.0 167.724 5.620 -999.990 -999.990 1.677 ..P WKT 2010 12 21 08 49 55 31.3200 -97.3300 251.000 30.0 160.889 5.650 -999.990 -999.990 1.609 ..P WKT 2010 12 21 08 54 55 31.3200 -97.3300 251.000 122.0 164.069 5.870 -999.990 -999.990 1.641 ..P WKT 2010 12 21 08 59 55 31.3200 -97.3300 251.000 457.0 176.071 6.130 -999.990 -999.990 1.761 ..P WKT 2010 12 21 09 09 55 31.3200 -97.3300 251.000 30.0 160.755 7.120 -999.990 -999.990 1.608 ..P WKT 2010 12 21 09 14 55 31.3200 -97.3300 251.000 122.0 150.828 6.320 -999.990 -999.990 1.508 ..P WKT 2010 12 21 09 19 55 31.3200 -97.3300 251.000 457.0 177.351 6.100 -999.990 -999.990 1.774 ..P WKT 2010 12 21 09 24 55 31.3200 -97.3300 251.000 30.0 152.166 6.360 -999.990 -999.990 1.522 ..P WKT 2010 12 21 09 29 55 31.3200 -97.3300 251.000 122.0 157.504 6.210 -999.990 -999.990 1.575 ..P WKT 2010 12 21 09 34 55 31.3200 -97.3300 251.000 457.0 165.336 5.750 -999.990 -999.990 1.653 ..P WKT 2010 12 21 09 44 55 31.3200 -97.3300 251.000 30.0 158.181 5.740 -999.990 -999.990 1.582 ..P WKT 2010 12 21 09 49 55 31.3200 -97.3300 251.000 122.0 158.050 5.580 -999.990 -999.990 1.581 ..P WKT 2010 12 21 09 54 55 31.3200 -97.3300 251.000 457.0 165.273 5.490 -999.990 -999.990 1.653 ..P WKT 2010 12 21 09 59 55 31.3200 -97.3300 251.000 30.0 154.374 5.570 -999.990 -999.990 1.544 ..P WKT 2010 12 21 10 04 55 31.3200 -97.3300 251.000 122.0 157.656 5.260 -999.990 -999.990 1.577 ..P WKT 2010 12 21 10 09 55 31.3200 -97.3300 251.000 457.0 166.450 5.720 -999.990 -999.990 1.664 ..P WKT 2010 12 21 10 19 55 31.3200 -97.3300 251.000 30.0 156.739 5.590 -999.990 -999.990 1.567 ..P WKT 2010 12 21 10 24 55 31.3200 -97.3300 251.000 122.0 155.822 4.820 -999.990 -999.990 1.558 ..P WKT 2010 12 21 10 29 55 31.3200 -97.3300 251.000 457.0 163.295 4.950 -999.990 -999.990 1.633 ..P WKT 2010 12 21 10 34 55 31.3200 -97.3300 251.000 30.0 155.037 4.770 -999.990 -999.990 1.550 ..P WKT 2010 12 21 10 39 55 31.3200 -97.3300 251.000 122.0 160.673 4.710 -999.990 -999.990 1.607 ..P WKT 2010 12 21 10 44 55 31.3200 -97.3300 251.000 457.0 156.087 5.300 -999.990 -999.990 1.561 ..P WKT 2010 12 21 10 54 55 31.3200 -97.3300 251.000 30.0 160.391 4.750 -999.990 -999.990 1.604 ..P WKT 2010 12 21 10 59 55 31.3200 -97.3300 251.000 122.0 158.539 4.580 -999.990 -999.990 1.585 ..P WKT 2010 12 21 11 04 55 31.3200 -97.3300 251.000 457.0 153.285 4.950 -999.990 -999.990 1.533 ..P WKT 2010 12 21 11 09 55 31.3200 -97.3300 251.000 30.0 159.810 5.660 -999.990 -999.990 1.598 ..P WKT 2010 12 21 11 14 55 31.3200 -97.3300 251.000 122.0 154.559 5.320 -999.990 -999.990 1.546 ..P WKT 2010 12 21 11 19 55 31.3200 -97.3300 251.000 457.0 149.833 4.840 -999.990 -999.990 1.498 ..P WKT 2010 12 21 11 29 55 31.3200 -97.3300 251.000 30.0 153.313 4.470 -999.990 -999.990 1.533 ..P WKT 2010 12 21 11 34 55 31.3200 -97.3300 251.000 122.0 159.944 4.920 -999.990 -999.990 1.599 ..P WKT 2010 12 21 11 39 55 31.3200 -97.3300 251.000 457.0 148.542 5.180 -999.990 -999.990 1.485 ..P WKT 2010 12 21 11 44 55 31.3200 -97.3300 251.000 30.0 164.836 7.560 -999.990 -999.990 1.648 ..P WKT 2010 12 21 11 49 55 31.3200 -97.3300 251.000 122.0 166.106 6.830 -999.990 -999.990 1.661 ..P WKT 2010 12 21 12 09 55 31.3200 -97.3300 251.000 457.0 159.676 4.720 -999.990 -999.990 1.597 ..P WKT 2010 12 21 12 10 25 31.3200 -97.3300 251.000 457.0 161.652 4.870 -999.990 -999.990 1.617 ..P WKT 2010 12 21 12 10 55 31.3200 -97.3300 251.000 457.0 160.886 4.830 -999.990 -999.990 1.609 ..P WKT 2010 12 21 12 11 25 31.3200 -97.3300 251.000 457.0 161.948 5.100 -999.990 -999.990 1.619 ..P WKT 2010 12 21 12 11 55 31.3200 -97.3300 251.000 457.0 160.007 5.260 -999.990 -999.990 1.600 ..P WKT 2010 12 21 12 12 25 31.3200 -97.3300 251.000 457.0 159.503 5.350 -999.990 -999.990 1.595 ..P WKT 2010 12 21 12 12 55 31.3200 -97.3300 251.000 457.0 161.609 5.460 -999.990 -999.990 1.616 ..P WKT 2010 12 21 12 13 25 31.3200 -97.3300 251.000 457.0 166.718 6.960 -999.990 -999.990 1.667 ..P WKT 2010 12 21 12 13 55 31.3200 -97.3300 251.000 457.0 168.824 5.590 -999.990 -999.990 1.688 ..P WKT 2010 12 21 12 14 25 31.3200 -97.3300 251.000 457.0 168.841 5.580 -999.990 -999.990 1.688 ..P WKT 2010 12 21 12 14 55 31.3200 -97.3300 251.000 457.0 161.418 7.090 -999.990 -999.990 1.614 ..P WKT 2010 12 21 12 19 55 31.3200 -97.3300 251.000 30.0 163.943 6.800 -999.990 -999.990 1.639 ..P WKT 2010 12 21 12 24 55 31.3200 -97.3300 251.000 122.0 161.116 7.350 -999.990 -999.990 1.611 ..P WKT 2010 12 21 12 29 55 31.3200 -97.3300 251.000 457.0 146.144 6.220 -999.990 -999.990 1.461 ..P WKT 2010 12 21 12 34 55 31.3200 -97.3300 251.000 30.0 163.686 5.470 -999.990 -999.990 1.637 ..P WKT 2010 12 21 12 39 55 31.3200 -97.3300 251.000 122.0 163.079 4.880 -999.990 -999.990 1.631 ..P WKT 2010 12 21 12 44 55 31.3200 -97.3300 251.000 457.0 157.899 4.470 -999.990 -999.990 1.579 ..P WKT 2010 12 21 12 54 55 31.3200 -97.3300 251.000 30.0 159.638 4.470 -999.990 -999.990 1.596 ..P WKT 2010 12 21 12 59 55 31.3200 -97.3300 251.000 122.0 155.325 5.050 -999.990 -999.990 1.553 ..P WKT 2010 12 21 13 04 55 31.3200 -97.3300 251.000 457.0 148.005 5.510 -999.990 -999.990 1.480 ..P WKT 2010 12 21 13 09 55 31.3200 -97.3300 251.000 30.0 163.941 5.420 -999.990 -999.990 1.639 ..P WKT 2010 12 21 13 14 55 31.3200 -97.3300 251.000 122.0 160.541 4.150 -999.990 -999.990 1.605 ..P WKT 2010 12 21 13 19 55 31.3200 -97.3300 251.000 457.0 133.617 4.500 -999.990 -999.990 1.336 ..P WKT 2010 12 21 13 29 55 31.3200 -97.3300 251.000 30.0 161.745 4.440 -999.990 -999.990 1.617 ..P WKT 2010 12 21 13 34 55 31.3200 -97.3300 251.000 122.0 160.996 4.740 -999.990 -999.990 1.610 ..P WKT 2010 12 21 13 39 55 31.3200 -97.3300 251.000 457.0 133.969 4.990 -999.990 -999.990 1.340 ..P WKT 2010 12 21 13 44 55 31.3200 -97.3300 251.000 30.0 167.732 6.030 -999.990 -999.990 1.677 ..P WKT 2010 12 21 13 49 55 31.3200 -97.3300 251.000 122.0 170.905 5.280 -999.990 -999.990 1.709 ..P WKT 2010 12 21 13 54 55 31.3200 -97.3300 251.000 457.0 153.156 5.550 -999.990 -999.990 1.532 ..P WKT 2010 12 21 14 04 55 31.3200 -97.3300 251.000 30.0 166.807 5.590 -999.990 -999.990 1.668 ..P WKT 2010 12 21 14 09 55 31.3200 -97.3300 251.000 122.0 163.945 5.600 -999.990 -999.990 1.639 ..P WKT 2010 12 21 14 14 55 31.3200 -97.3300 251.000 457.0 115.564 5.820 -999.990 -999.990 1.156 ..P WKT 2010 12 21 14 19 55 31.3200 -97.3300 251.000 30.0 163.716 5.610 -999.990 -999.990 1.637 ..P WKT 2010 12 21 14 24 55 31.3200 -97.3300 251.000 122.0 158.237 5.440 -999.990 -999.990 1.582 ..P WKT 2010 12 21 14 29 55 31.3200 -97.3300 251.000 457.0 123.972 4.970 -999.990 -999.990 1.240 ..P WKT 2010 12 21 14 39 55 31.3200 -97.3300 251.000 30.0 168.790 4.940 -999.990 -999.990 1.688 ..P WKT 2010 12 21 14 44 55 31.3200 -97.3300 251.000 122.0 158.374 5.790 -999.990 -999.990 1.584 ..P WKT 2010 12 21 14 49 55 31.3200 -97.3300 251.000 457.0 131.726 5.770 -999.990 -999.990 1.317 ..P WKT 2010 12 21 14 54 55 31.3200 -97.3300 251.000 30.0 173.924 6.460 -999.990 -999.990 1.739 ..P WKT 2010 12 21 14 59 55 31.3200 -97.3300 251.000 122.0 164.553 5.040 -999.990 -999.990 1.646 ..P WKT 2010 12 21 15 04 55 31.3200 -97.3300 251.000 457.0 109.623 4.090 -999.990 -999.990 1.096 ..P WKT 2010 12 21 15 14 55 31.3200 -97.3300 251.000 30.0 168.062 5.640 -999.990 -999.990 1.681 ..P WKT 2010 12 21 15 19 55 31.3200 -97.3300 251.000 122.0 163.346 4.200 -999.990 -999.990 1.633 ..P WKT 2010 12 21 15 24 55 31.3200 -97.3300 251.000 457.0 102.840 4.240 -999.990 -999.990 1.028 ..P WKT 2010 12 21 15 29 55 31.3200 -97.3300 251.000 30.0 174.603 4.520 -999.990 -999.990 1.746 ..P WKT 2010 12 21 15 34 55 31.3200 -97.3300 251.000 122.0 174.863 4.490 -999.990 -999.990 1.749 ..P WKT 2010 12 21 15 39 55 31.3200 -97.3300 251.000 457.0 118.798 4.330 -999.990 -999.990 1.188 ..P WKT 2010 12 21 15 49 55 31.3200 -97.3300 251.000 30.0 185.152 4.610 -999.990 -999.990 1.852 ..P WKT 2010 12 21 15 54 55 31.3200 -97.3300 251.000 122.0 177.496 4.770 -999.990 -999.990 1.775 ..P WKT 2010 12 21 15 59 55 31.3200 -97.3300 251.000 457.0 118.865 5.550 -999.990 -999.990 1.189 ..P WKT 2010 12 21 16 04 55 31.3200 -97.3300 251.000 30.0 175.545 4.620 -999.990 -999.990 1.755 ..P WKT 2010 12 21 16 09 55 31.3200 -97.3300 251.000 122.0 175.750 5.140 -999.990 -999.990 1.758 ..P WKT 2010 12 21 16 14 55 31.3200 -97.3300 251.000 457.0 117.235 4.480 -999.990 -999.990 1.172 ..P WKT 2010 12 21 16 24 55 31.3200 -97.3300 251.000 30.0 178.478 4.640 -999.990 -999.990 1.785 ..P WKT 2010 12 21 16 29 55 31.3200 -97.3300 251.000 122.0 186.436 5.190 -999.990 -999.990 1.864 ..P WKT 2010 12 21 16 34 55 31.3200 -97.3300 251.000 457.0 112.713 5.810 -999.990 -999.990 1.127 ..P WKT 2010 12 21 16 39 55 31.3200 -97.3300 251.000 30.0 173.641 6.070 -999.990 -999.990 1.736 ..P WKT 2010 12 21 16 44 55 31.3200 -97.3300 251.000 122.0 175.700 5.910 -999.990 -999.990 1.757 ..P WKT 2010 12 21 16 49 55 31.3200 -97.3300 251.000 457.0 100.121 4.630 -999.990 -999.990 1.001 ..P WKT 2010 12 21 17 04 55 31.3200 -97.3300 251.000 30.0 171.949 5.410 -999.990 -999.990 1.719 ..P WKT 2010 12 21 17 09 55 31.3200 -97.3300 251.000 122.0 172.671 6.180 -999.990 -999.990 1.727 ..P WKT 2010 12 21 17 14 55 31.3200 -97.3300 251.000 457.0 111.336 6.100 -999.990 -999.990 1.113 ..P WKT 2010 12 21 17 19 55 31.3200 -97.3300 251.000 30.0 168.736 5.380 -999.990 -999.990 1.687 ..P WKT 2010 12 21 17 24 55 31.3200 -97.3300 251.000 122.0 171.819 4.290 -999.990 -999.990 1.718 ..P WKT 2010 12 21 17 29 55 31.3200 -97.3300 251.000 457.0 131.728 4.480 -999.990 -999.990 1.317 ..P WKT 2010 12 21 17 39 55 31.3200 -97.3300 251.000 30.0 170.842 4.620 -999.990 -999.990 1.708 ..P WKT 2010 12 21 17 44 55 31.3200 -97.3300 251.000 122.0 173.409 4.540 -999.990 -999.990 1.734 ..P WKT 2010 12 21 17 49 55 31.3200 -97.3300 251.000 457.0 151.559 4.540 -999.990 -999.990 1.516 ..P WKT 2010 12 21 17 54 55 31.3200 -97.3300 251.000 30.0 176.706 4.700 -999.990 -999.990 1.767 ..P WKT 2010 12 21 17 59 55 31.3200 -97.3300 251.000 122.0 178.486 4.620 -999.990 -999.990 1.785 ..P WKT 2010 12 21 18 04 55 31.3200 -97.3300 251.000 457.0 119.076 4.320 -999.990 -999.990 1.191 ..P WKT 2010 12 21 18 14 55 31.3200 -97.3300 251.000 30.0 168.332 5.390 -999.990 -999.990 1.683 ..P WKT 2010 12 21 18 19 55 31.3200 -97.3300 251.000 122.0 173.264 4.960 -999.990 -999.990 1.733 ..P WKT 2010 12 21 18 24 55 31.3200 -97.3300 251.000 457.0 111.732 4.400 -999.990 -999.990 1.117 ..P WKT 2010 12 21 18 29 55 31.3200 -97.3300 251.000 30.0 168.944 4.860 -999.990 -999.990 1.689 ..P WKT 2010 12 21 18 34 55 31.3200 -97.3300 251.000 122.0 166.258 4.420 -999.990 -999.990 1.663 ..P WKT 2010 12 21 18 39 55 31.3200 -97.3300 251.000 457.0 105.761 3.930 -999.990 -999.990 1.058 ..P WKT 2010 12 21 18 49 55 31.3200 -97.3300 251.000 30.0 169.836 4.310 -999.990 -999.990 1.698 ..P WKT 2010 12 21 18 54 55 31.3200 -97.3300 251.000 122.0 175.109 4.720 -999.990 -999.990 1.751 ..P WKT 2010 12 21 18 59 55 31.3200 -97.3300 251.000 457.0 105.468 4.830 -999.990 -999.990 1.055 ..P WKT 2010 12 21 19 04 55 31.3200 -97.3300 251.000 30.0 167.257 4.720 -999.990 -999.990 1.673 ..P WKT 2010 12 21 19 09 55 31.3200 -97.3300 251.000 122.0 173.582 4.510 -999.990 -999.990 1.736 ..P WKT 2010 12 21 19 14 55 31.3200 -97.3300 251.000 457.0 122.854 7.480 -999.990 -999.990 1.229 ..P WKT 2010 12 21 19 24 55 31.3200 -97.3300 251.000 30.0 164.110 3.980 -999.990 -999.990 1.641 ..P WKT 2010 12 21 19 29 55 31.3200 -97.3300 251.000 122.0 171.434 4.370 -999.990 -999.990 1.714 ..P WKT 2010 12 21 19 34 55 31.3200 -97.3300 251.000 457.0 119.184 4.060 -999.990 -999.990 1.192 ..P WKT 2010 12 21 19 39 55 31.3200 -97.3300 251.000 30.0 165.699 4.310 -999.990 -999.990 1.657 ..P WKT 2010 12 21 19 44 55 31.3200 -97.3300 251.000 122.0 167.368 6.180 -999.990 -999.990 1.674 ..P WKT 2010 12 21 19 49 55 31.3200 -97.3300 251.000 457.0 127.208 5.370 -999.990 -999.990 1.272 ..P WKT 2010 12 21 19 59 55 31.3200 -97.3300 251.000 30.0 166.928 4.870 -999.990 -999.990 1.669 ..P WKT 2010 12 21 20 04 55 31.3200 -97.3300 251.000 122.0 167.227 5.100 -999.990 -999.990 1.672 ..P WKT 2010 12 21 20 09 55 31.3200 -97.3300 251.000 457.0 162.130 4.590 -999.990 -999.990 1.621 ..P WKT 2010 12 21 20 14 55 31.3200 -97.3300 251.000 30.0 170.455 4.390 -999.990 -999.990 1.705 ..P WKT 2010 12 21 20 19 55 31.3200 -97.3300 251.000 122.0 168.780 4.560 -999.990 -999.990 1.688 ..P WKT 2010 12 21 20 24 55 31.3200 -97.3300 251.000 457.0 149.994 5.730 -999.990 -999.990 1.500 ..P WKT 2010 12 21 20 34 55 31.3200 -97.3300 251.000 30.0 165.745 4.320 -999.990 -999.990 1.657 ..P WKT 2010 12 21 20 39 55 31.3200 -97.3300 251.000 122.0 166.720 4.460 -999.990 -999.990 1.667 ..P WKT 2010 12 21 20 44 55 31.3200 -97.3300 251.000 457.0 144.786 4.790 -999.990 -999.990 1.448 ..P WKT 2010 12 21 20 49 55 31.3200 -97.3300 251.000 30.0 162.088 4.520 -999.990 -999.990 1.621 ..P WKT 2010 12 21 20 54 55 31.3200 -97.3300 251.000 122.0 167.014 4.970 -999.990 -999.990 1.670 ..P WKT 2010 12 21 20 59 55 31.3200 -97.3300 251.000 457.0 146.655 5.270 -999.990 -999.990 1.467 ..P WKT 2010 12 21 21 09 55 31.3200 -97.3300 251.000 30.0 142.487 5.890 -999.990 -999.990 1.425 ..P WKT 2010 12 21 21 14 55 31.3200 -97.3300 251.000 122.0 155.656 4.770 -999.990 -999.990 1.557 ..P WKT 2010 12 21 21 19 55 31.3200 -97.3300 251.000 457.0 149.856 5.190 -999.990 -999.990 1.499 ..P WKT 2010 12 21 21 24 55 31.3200 -97.3300 251.000 30.0 143.001 5.300 -999.990 -999.990 1.430 ..P WKT 2010 12 21 21 29 55 31.3200 -97.3300 251.000 122.0 154.724 5.210 -999.990 -999.990 1.547 ..P WKT 2010 12 21 21 34 55 31.3200 -97.3300 251.000 457.0 144.441 5.790 -999.990 -999.990 1.444 ..P WKT 2010 12 21 21 44 55 31.3200 -97.3300 251.000 30.0 140.178 5.450 -999.990 -999.990 1.402 ..P WKT 2010 12 21 21 49 55 31.3200 -97.3300 251.000 122.0 154.765 5.520 -999.990 -999.990 1.548 ..P WKT 2010 12 21 21 54 55 31.3200 -97.3300 251.000 457.0 137.192 5.060 -999.990 -999.990 1.372 ..P WKT 2010 12 21 21 59 55 31.3200 -97.3300 251.000 30.0 150.201 5.130 -999.990 -999.990 1.502 ..P WKT 2010 12 21 22 04 55 31.3200 -97.3300 251.000 122.0 143.699 4.850 -999.990 -999.990 1.437 ..P WKT 2010 12 21 22 09 55 31.3200 -97.3300 251.000 457.0 121.637 4.700 -999.990 -999.990 1.216 ..P WKT 2010 12 21 22 19 55 31.3200 -97.3300 251.000 30.0 146.831 4.900 -999.990 -999.990 1.468 ..P WKT 2010 12 21 22 24 55 31.3200 -97.3300 251.000 122.0 156.380 4.850 -999.990 -999.990 1.564 ..P WKT 2010 12 21 22 29 55 31.3200 -97.3300 251.000 457.0 135.857 5.330 -999.990 -999.990 1.359 ..P WKT 2010 12 21 22 34 55 31.3200 -97.3300 251.000 30.0 146.461 4.870 -999.990 -999.990 1.465 ..P WKT 2010 12 21 22 39 55 31.3200 -97.3300 251.000 122.0 152.582 4.950 -999.990 -999.990 1.526 ..P WKT 2010 12 21 22 44 55 31.3200 -97.3300 251.000 457.0 127.040 4.980 -999.990 -999.990 1.270 ..P WKT 2010 12 21 22 54 55 31.3200 -97.3300 251.000 30.0 166.992 5.460 -999.990 -999.990 1.670 ..P WKT 2010 12 21 22 59 55 31.3200 -97.3300 251.000 122.0 169.157 5.040 -999.990 -999.990 1.692 ..P WKT 2010 12 21 23 04 55 31.3200 -97.3300 251.000 457.0 152.319 4.920 -999.990 -999.990 1.523 ..P WKT 2010 12 21 23 09 55 31.3200 -97.3300 251.000 30.0 163.194 4.750 -999.990 -999.990 1.632 ..P WKT 2010 12 21 23 14 55 31.3200 -97.3300 251.000 122.0 168.528 4.750 -999.990 -999.990 1.685 ..P WKT 2010 12 21 23 19 55 31.3200 -97.3300 251.000 457.0 159.077 5.220 -999.990 -999.990 1.591 ..P WKT 2010 12 21 23 29 55 31.3200 -97.3300 251.000 30.0 168.339 4.680 -999.990 -999.990 1.683 ..P WKT 2010 12 21 23 34 55 31.3200 -97.3300 251.000 122.0 164.476 4.790 -999.990 -999.990 1.645 ..P WKT 2010 12 21 23 39 55 31.3200 -97.3300 251.000 457.0 146.748 5.170 -999.990 -999.990 1.467 ..P WKT 2010 12 21 23 44 55 31.3200 -97.3300 251.000 30.0 169.560 7.150 -999.990 -999.990 1.696 ..P WKT 2010 12 21 23 49 55 31.3200 -97.3300 251.000 122.0 180.621 6.840 -999.990 -999.990 1.806 ..P WKT 2010 12 22 00 09 55 31.3200 -97.3300 251.000 457.0 141.724 4.850 -999.990 -999.990 1.417 ..P WKT 2010 12 22 00 10 25 31.3200 -97.3300 251.000 457.0 138.279 4.660 -999.990 -999.990 1.383 ..P WKT 2010 12 22 00 10 55 31.3200 -97.3300 251.000 457.0 133.513 4.780 -999.990 -999.990 1.335 ..P WKT 2010 12 22 00 11 25 31.3200 -97.3300 251.000 457.0 134.560 4.810 -999.990 -999.990 1.346 ..P WKT 2010 12 22 00 11 55 31.3200 -97.3300 251.000 457.0 134.814 5.410 -999.990 -999.990 1.348 ..P WKT 2010 12 22 00 12 25 31.3200 -97.3300 251.000 457.0 141.145 5.090 -999.990 -999.990 1.411 ..P WKT 2010 12 22 00 12 55 31.3200 -97.3300 251.000 457.0 141.135 5.240 -999.990 -999.990 1.411 ..P WKT 2010 12 22 00 13 25 31.3200 -97.3300 251.000 457.0 138.483 5.210 -999.990 -999.990 1.385 ..P WKT 2010 12 22 00 13 55 31.3200 -97.3300 251.000 457.0 133.849 5.470 -999.990 -999.990 1.338 ..P WKT 2010 12 22 00 14 25 31.3200 -97.3300 251.000 457.0 131.064 5.630 -999.990 -999.990 1.311 ..P WKT 2010 12 22 00 14 55 31.3200 -97.3300 251.000 457.0 133.168 5.930 -999.990 -999.990 1.332 ..P WKT 2010 12 22 00 19 55 31.3200 -97.3300 251.000 30.0 212.608 6.810 -999.990 -999.990 2.126 ..P WKT 2010 12 22 00 24 55 31.3200 -97.3300 251.000 122.0 224.536 7.140 -999.990 -999.990 2.245 ..P WKT 2010 12 22 00 29 55 31.3200 -97.3300 251.000 457.0 136.829 6.030 -999.990 -999.990 1.368 ..P WKT 2010 12 22 00 34 55 31.3200 -97.3300 251.000 30.0 223.817 5.460 -999.990 -999.990 2.238 ..P WKT 2010 12 22 00 39 55 31.3200 -97.3300 251.000 122.0 217.377 4.800 -999.990 -999.990 2.174 ..P WKT 2010 12 22 00 44 55 31.3200 -97.3300 251.000 457.0 123.970 4.910 -999.990 -999.990 1.240 ..P WKT 2010 12 22 00 54 55 31.3200 -97.3300 251.000 30.0 226.195 5.270 -999.990 -999.990 2.262 ..P WKT 2010 12 22 00 59 55 31.3200 -97.3300 251.000 122.0 211.147 4.910 -999.990 -999.990 2.111 ..P WKT 2010 12 22 01 04 55 31.3200 -97.3300 251.000 457.0 102.500 5.800 -999.990 -999.990 1.025 ..P WKT 2010 12 22 01 09 55 31.3200 -97.3300 251.000 30.0 229.433 4.890 -999.990 -999.990 2.294 ..P WKT 2010 12 22 01 14 55 31.3200 -97.3300 251.000 122.0 218.085 4.840 -999.990 -999.990 2.181 ..P WKT 2010 12 22 01 19 55 31.3200 -97.3300 251.000 457.0 94.610 5.310 -999.990 -999.990 0.946 ..P WKT 2010 12 22 01 29 55 31.3200 -97.3300 251.000 30.0 223.420 4.980 -999.990 -999.990 2.234 ..P WKT 2010 12 22 01 34 55 31.3200 -97.3300 251.000 122.0 208.479 5.220 -999.990 -999.990 2.085 ..P WKT 2010 12 22 01 39 55 31.3200 -97.3300 251.000 457.0 99.900 4.780 -999.990 -999.990 0.999 ..P WKT 2010 12 22 01 44 55 31.3200 -97.3300 251.000 30.0 216.419 4.730 -999.990 -999.990 2.164 ..P WKT 2010 12 22 01 49 55 31.3200 -97.3300 251.000 122.0 214.438 5.340 -999.990 -999.990 2.144 ..P WKT 2010 12 22 01 54 55 31.3200 -97.3300 251.000 457.0 115.628 5.000 -999.990 -999.990 1.156 ..P WKT 2010 12 22 02 04 55 31.3200 -97.3300 251.000 30.0 206.791 4.560 -999.990 -999.990 2.068 ..P WKT 2010 12 22 02 09 55 31.3200 -97.3300 251.000 122.0 202.578 4.480 -999.990 -999.990 2.026 ..P WKT 2010 12 22 02 14 55 31.3200 -97.3300 251.000 457.0 99.132 4.200 -999.990 -999.990 0.991 ..P WKT 2010 12 22 02 19 55 31.3200 -97.3300 251.000 30.0 198.650 4.250 -999.990 -999.990 1.987 ..P WKT 2010 12 22 02 24 55 31.3200 -97.3300 251.000 122.0 198.141 5.840 -999.990 -999.990 1.981 ..P WKT 2010 12 22 02 29 55 31.3200 -97.3300 251.000 457.0 87.001 3.430 -999.990 -999.990 0.870 ..P WKT 2010 12 22 02 39 55 31.3200 -97.3300 251.000 30.0 198.467 3.900 -999.990 -999.990 1.985 ..P WKT 2010 12 22 02 44 55 31.3200 -97.3300 251.000 122.0 246.930 4.400 -999.990 -999.990 2.469 ..P WKT 2010 12 22 02 49 55 31.3200 -97.3300 251.000 457.0 97.380 4.990 -999.990 -999.990 0.974 ..P WKT 2010 12 22 02 54 55 31.3200 -97.3300 251.000 30.0 204.882 4.280 -999.990 -999.990 2.049 ..P WKT 2010 12 22 02 59 55 31.3200 -97.3300 251.000 122.0 221.848 4.900 -999.990 -999.990 2.218 ..P WKT 2010 12 22 03 04 55 31.3200 -97.3300 251.000 457.0 92.921 4.330 -999.990 -999.990 0.929 ..P WKT 2010 12 22 03 14 55 31.3200 -97.3300 251.000 30.0 212.492 4.770 -999.990 -999.990 2.125 ..P WKT 2010 12 22 03 19 55 31.3200 -97.3300 251.000 122.0 218.984 4.460 -999.990 -999.990 2.190 ..P WKT 2010 12 22 03 24 55 31.3200 -97.3300 251.000 457.0 113.446 4.120 -999.990 -999.990 1.134 ..P WKT 2010 12 22 03 29 55 31.3200 -97.3300 251.000 30.0 216.870 4.590 -999.990 -999.990 2.169 ..P WKT 2010 12 22 03 34 55 31.3200 -97.3300 251.000 122.0 218.329 4.380 -999.990 -999.990 2.183 ..P WKT 2010 12 22 03 39 55 31.3200 -97.3300 251.000 457.0 126.680 3.740 -999.990 -999.990 1.267 ..P WKT 2010 12 22 03 49 55 31.3200 -97.3300 251.000 30.0 234.384 4.180 -999.990 -999.990 2.344 ..P WKT 2010 12 22 03 54 55 31.3200 -97.3300 251.000 122.0 229.902 4.930 -999.990 -999.990 2.299 ..P WKT 2010 12 22 03 59 55 31.3200 -97.3300 251.000 457.0 140.900 4.900 -999.990 -999.990 1.409 ..P WKT 2010 12 22 04 04 55 31.3200 -97.3300 251.000 30.0 236.836 5.780 -999.990 -999.990 2.368 ..P WKT 2010 12 22 04 09 55 31.3200 -97.3300 251.000 122.0 216.852 4.400 -999.990 -999.990 2.169 ..P WKT 2010 12 22 04 14 55 31.3200 -97.3300 251.000 457.0 138.035 4.090 -999.990 -999.990 1.380 ..P WKT 2010 12 22 04 24 55 31.3200 -97.3300 251.000 30.0 245.105 4.640 -999.990 -999.990 2.451 ..P WKT 2010 12 22 04 29 55 31.3200 -97.3300 251.000 122.0 204.670 4.440 -999.990 -999.990 2.047 ..P WKT 2010 12 22 04 34 55 31.3200 -97.3300 251.000 457.0 141.964 5.610 -999.990 -999.990 1.420 ..P WKT 2010 12 22 04 39 55 31.3200 -97.3300 251.000 30.0 251.820 4.450 -999.990 -999.990 2.518 ..P WKT 2010 12 22 04 44 55 31.3200 -97.3300 251.000 122.0 191.761 4.350 -999.990 -999.990 1.918 ..P WKT 2010 12 22 04 49 55 31.3200 -97.3300 251.000 457.0 151.314 4.260 -999.990 -999.990 1.513 ..P WKT 2010 12 22 05 04 55 31.3200 -97.3300 251.000 30.0 237.506 4.930 -999.990 -999.990 2.375 ..P WKT 2010 12 22 05 09 55 31.3200 -97.3300 251.000 122.0 177.267 5.020 -999.990 -999.990 1.773 ..P WKT 2010 12 22 05 14 55 31.3200 -97.3300 251.000 457.0 131.342 5.480 -999.990 -999.990 1.313 ..P WKT 2010 12 22 05 19 55 31.3200 -97.3300 251.000 30.0 235.784 4.760 -999.990 -999.990 2.358 ..P WKT 2010 12 22 05 24 55 31.3200 -97.3300 251.000 122.0 178.053 4.420 -999.990 -999.990 1.781 ..P WKT 2010 12 22 05 29 55 31.3200 -97.3300 251.000 457.0 128.672 4.090 -999.990 -999.990 1.287 ..P WKT 2010 12 22 05 39 55 31.3200 -97.3300 251.000 30.0 210.001 3.880 -999.990 -999.990 2.100 ..P WKT 2010 12 22 05 44 55 31.3200 -97.3300 251.000 122.0 192.172 4.470 -999.990 -999.990 1.922 ..P WKT 2010 12 22 05 49 55 31.3200 -97.3300 251.000 457.0 135.075 5.050 -999.990 -999.990 1.351 ..P WKT 2010 12 22 05 54 55 31.3200 -97.3300 251.000 30.0 215.143 4.490 -999.990 -999.990 2.151 ..P WKT 2010 12 22 05 59 55 31.3200 -97.3300 251.000 122.0 192.269 4.460 -999.990 -999.990 1.923 ..P WKT 2010 12 22 06 04 55 31.3200 -97.3300 251.000 457.0 142.858 3.400 -999.990 -999.990 1.429 ..P WKT 2010 12 22 06 14 55 31.3200 -97.3300 251.000 30.0 216.366 4.280 -999.990 -999.990 2.164 ..P WKT 2010 12 22 06 19 55 31.3200 -97.3300 251.000 122.0 194.663 4.100 -999.990 -999.990 1.947 ..P WKT 2010 12 22 06 24 55 31.3200 -97.3300 251.000 457.0 154.113 4.440 -999.990 -999.990 1.541 ..P WKT 2010 12 22 06 29 55 31.3200 -97.3300 251.000 30.0 227.427 4.400 -999.990 -999.990 2.274 ..P WKT 2010 12 22 06 34 55 31.3200 -97.3300 251.000 122.0 198.022 4.880 -999.990 -999.990 1.980 ..P WKT 2010 12 22 06 39 55 31.3200 -97.3300 251.000 457.0 156.403 4.540 -999.990 -999.990 1.564 ..P WKT 2010 12 22 06 49 55 31.3200 -97.3300 251.000 30.0 230.038 5.370 -999.990 -999.990 2.300 ..P WKT 2010 12 22 06 54 55 31.3200 -97.3300 251.000 122.0 234.858 5.010 -999.990 -999.990 2.349 ..P WKT 2010 12 22 06 59 55 31.3200 -97.3300 251.000 457.0 156.304 5.050 -999.990 -999.990 1.563 ..P WKT 2010 12 22 07 04 55 31.3200 -97.3300 251.000 30.0 240.518 5.580 -999.990 -999.990 2.405 ..P WKT 2010 12 22 07 09 55 31.3200 -97.3300 251.000 122.0 190.900 4.870 -999.990 -999.990 1.909 ..P WKT 2010 12 22 07 14 55 31.3200 -97.3300 251.000 457.0 152.961 4.680 -999.990 -999.990 1.530 ..P WKT 2010 12 22 07 24 55 31.3200 -97.3300 251.000 30.0 213.233 4.620 -999.990 -999.990 2.132 ..P WKT 2010 12 22 07 29 55 31.3200 -97.3300 251.000 122.0 204.811 4.500 -999.990 -999.990 2.048 ..P WKT 2010 12 22 07 34 55 31.3200 -97.3300 251.000 457.0 148.972 4.410 -999.990 -999.990 1.490 ..P WKT 2010 12 22 07 39 55 31.3200 -97.3300 251.000 30.0 204.435 4.930 -999.990 -999.990 2.044 ..P WKT 2010 12 22 07 44 55 31.3200 -97.3300 251.000 122.0 204.513 4.440 -999.990 -999.990 2.045 ..P WKT 2010 12 22 07 49 55 31.3200 -97.3300 251.000 457.0 160.620 3.770 -999.990 -999.990 1.606 ..P WKT 2010 12 22 07 59 55 31.3200 -97.3300 251.000 30.0 193.851 4.150 -999.990 -999.990 1.939 ..P WKT 2010 12 22 08 04 55 31.3200 -97.3300 251.000 122.0 188.747 3.920 -999.990 -999.990 1.887 ..P WKT 2010 12 22 08 09 55 31.3200 -97.3300 251.000 457.0 180.054 4.070 -999.990 -999.990 1.801 ..P WKT 2010 12 22 08 14 55 31.3200 -97.3300 251.000 30.0 188.236 4.240 -999.990 -999.990 1.882 ..P WKT 2010 12 22 08 19 55 31.3200 -97.3300 251.000 122.0 179.010 6.110 -999.990 -999.990 1.790 ..P WKT 2010 12 22 08 24 55 31.3200 -97.3300 251.000 457.0 178.156 4.060 -999.990 -999.990 1.782 ..P WKT 2010 12 22 08 34 55 31.3200 -97.3300 251.000 30.0 193.821 4.010 -999.990 -999.990 1.938 ..P WKT 2010 12 22 08 39 55 31.3200 -97.3300 251.000 122.0 194.259 4.260 -999.990 -999.990 1.943 ..P WKT 2010 12 22 08 44 55 31.3200 -97.3300 251.000 457.0 184.860 4.220 -999.990 -999.990 1.849 ..P WKT 2010 12 22 08 49 55 31.3200 -97.3300 251.000 30.0 228.104 4.460 -999.990 -999.990 2.281 ..P WKT 2010 12 22 08 54 55 31.3200 -97.3300 251.000 122.0 217.509 4.160 -999.990 -999.990 2.175 ..P WKT 2010 12 22 08 59 55 31.3200 -97.3300 251.000 457.0 171.947 3.810 -999.990 -999.990 1.719 ..P WKT 2010 12 22 09 09 55 31.3200 -97.3300 251.000 30.0 200.308 3.600 -999.990 -999.990 2.003 ..P WKT 2010 12 22 09 14 55 31.3200 -97.3300 251.000 122.0 178.234 4.440 -999.990 -999.990 1.782 ..P WKT 2010 12 22 09 19 55 31.3200 -97.3300 251.000 457.0 165.601 4.700 -999.990 -999.990 1.656 ..P WKT 2010 12 22 09 24 55 31.3200 -97.3300 251.000 30.0 179.831 4.870 -999.990 -999.990 1.798 ..P WKT 2010 12 22 09 29 55 31.3200 -97.3300 251.000 122.0 171.719 4.140 -999.990 -999.990 1.717 ..P WKT 2010 12 22 09 34 55 31.3200 -97.3300 251.000 457.0 165.467 4.040 -999.990 -999.990 1.655 ..P WKT 2010 12 22 09 44 55 31.3200 -97.3300 251.000 30.0 175.803 3.680 -999.990 -999.990 1.758 ..P WKT 2010 12 22 09 49 55 31.3200 -97.3300 251.000 122.0 179.623 4.060 -999.990 -999.990 1.796 ..P WKT 2010 12 22 09 54 55 31.3200 -97.3300 251.000 457.0 161.891 4.920 -999.990 -999.990 1.619 ..P WKT 2010 12 22 09 59 55 31.3200 -97.3300 251.000 30.0 183.805 5.520 -999.990 -999.990 1.838 ..P WKT 2010 12 22 10 04 55 31.3200 -97.3300 251.000 122.0 184.167 5.150 -999.990 -999.990 1.842 ..P WKT 2010 12 22 10 09 55 31.3200 -97.3300 251.000 457.0 158.980 5.040 -999.990 -999.990 1.590 ..P WKT 2010 12 22 10 19 55 31.3200 -97.3300 251.000 30.0 206.850 4.060 -999.990 -999.990 2.068 ..P WKT 2010 12 22 10 24 55 31.3200 -97.3300 251.000 122.0 210.445 4.990 -999.990 -999.990 2.104 ..P WKT 2010 12 22 10 29 55 31.3200 -97.3300 251.000 457.0 166.126 5.520 -999.990 -999.990 1.661 ..P WKT 2010 12 22 10 34 55 31.3200 -97.3300 251.000 30.0 209.384 6.770 -999.990 -999.990 2.094 ..P WKT 2010 12 22 10 39 55 31.3200 -97.3300 251.000 122.0 206.058 5.660 -999.990 -999.990 2.061 ..P WKT 2010 12 22 10 44 55 31.3200 -97.3300 251.000 457.0 164.926 4.590 -999.990 -999.990 1.649 ..P WKT 2010 12 22 10 54 55 31.3200 -97.3300 251.000 30.0 208.822 4.480 -999.990 -999.990 2.088 ..P WKT 2010 12 22 10 59 55 31.3200 -97.3300 251.000 122.0 204.925 5.590 -999.990 -999.990 2.049 ..P WKT 2010 12 22 11 04 55 31.3200 -97.3300 251.000 457.0 160.815 6.310 -999.990 -999.990 1.608 ..P WKT 2010 12 22 11 09 55 31.3200 -97.3300 251.000 30.0 200.857 6.040 -999.990 -999.990 2.009 ..P WKT 2010 12 22 11 14 55 31.3200 -97.3300 251.000 122.0 199.623 5.290 -999.990 -999.990 1.996 ..P WKT 2010 12 22 11 19 55 31.3200 -97.3300 251.000 457.0 172.018 4.440 -999.990 -999.990 1.720 ..P WKT 2010 12 22 11 29 55 31.3200 -97.3300 251.000 30.0 208.144 4.110 -999.990 -999.990 2.081 ..P WKT 2010 12 22 11 34 55 31.3200 -97.3300 251.000 122.0 201.555 5.430 -999.990 -999.990 2.016 ..P WKT 2010 12 22 11 39 55 31.3200 -97.3300 251.000 457.0 164.328 5.840 -999.990 -999.990 1.643 ..P WKT 2010 12 22 11 44 55 31.3200 -97.3300 251.000 30.0 201.297 6.080 -999.990 -999.990 2.013 ..P WKT 2010 12 22 11 49 55 31.3200 -97.3300 251.000 122.0 200.035 5.350 -999.990 -999.990 2.000 ..P WKT 2010 12 22 12 09 55 31.3200 -97.3300 251.000 457.0 168.373 4.790 -999.990 -999.990 1.684 ..P WKT 2010 12 22 12 10 25 31.3200 -97.3300 251.000 457.0 167.255 3.860 -999.990 -999.990 1.673 ..P WKT 2010 12 22 12 10 55 31.3200 -97.3300 251.000 457.0 164.404 4.500 -999.990 -999.990 1.644 ..P WKT 2010 12 22 12 11 25 31.3200 -97.3300 251.000 457.0 163.153 4.180 -999.990 -999.990 1.632 ..P WKT 2010 12 22 12 11 55 31.3200 -97.3300 251.000 457.0 165.099 4.240 -999.990 -999.990 1.651 ..P WKT 2010 12 22 12 12 25 31.3200 -97.3300 251.000 457.0 162.915 3.790 -999.990 -999.990 1.629 ..P WKT 2010 12 22 12 12 55 31.3200 -97.3300 251.000 457.0 164.195 4.190 -999.990 -999.990 1.642 ..P WKT 2010 12 22 12 13 25 31.3200 -97.3300 251.000 457.0 163.476 4.510 -999.990 -999.990 1.635 ..P WKT 2010 12 22 12 13 55 31.3200 -97.3300 251.000 457.0 167.155 4.350 -999.990 -999.990 1.672 ..P WKT 2010 12 22 12 14 25 31.3200 -97.3300 251.000 457.0 165.237 4.120 -999.990 -999.990 1.652 ..P WKT 2010 12 22 12 14 55 31.3200 -97.3300 251.000 457.0 165.585 4.780 -999.990 -999.990 1.656 ..P WKT 2010 12 22 12 19 55 31.3200 -97.3300 251.000 30.0 191.976 5.360 -999.990 -999.990 1.920 ..P WKT 2010 12 22 12 24 55 31.3200 -97.3300 251.000 122.0 190.120 6.420 -999.990 -999.990 1.901 ..P WKT 2010 12 22 12 29 55 31.3200 -97.3300 251.000 457.0 175.207 4.800 -999.990 -999.990 1.752 ..P WKT 2010 12 22 12 34 55 31.3200 -97.3300 251.000 30.0 196.534 4.210 -999.990 -999.990 1.965 ..P WKT 2010 12 22 12 39 55 31.3200 -97.3300 251.000 122.0 196.543 3.250 -999.990 -999.990 1.965 ..P WKT 2010 12 22 12 44 55 31.3200 -97.3300 251.000 457.0 179.632 4.200 -999.990 -999.990 1.796 ..P WKT 2010 12 22 12 54 55 31.3200 -97.3300 251.000 30.0 200.496 4.570 -999.990 -999.990 2.005 ..P WKT 2010 12 22 12 59 55 31.3200 -97.3300 251.000 122.0 204.431 3.290 -999.990 -999.990 2.044 ..P WKT 2010 12 22 13 04 55 31.3200 -97.3300 251.000 457.0 181.185 3.540 -999.990 -999.990 1.812 ..P WKT 2010 12 22 13 09 55 31.3200 -97.3300 251.000 30.0 204.573 4.120 -999.990 -999.990 2.046 ..P WKT 2010 12 22 13 14 55 31.3200 -97.3300 251.000 122.0 203.843 3.620 -999.990 -999.990 2.038 ..P WKT 2010 12 22 13 19 55 31.3200 -97.3300 251.000 457.0 181.131 3.340 -999.990 -999.990 1.811 ..P WKT 2010 12 22 13 29 55 31.3200 -97.3300 251.000 30.0 205.711 4.000 -999.990 -999.990 2.057 ..P WKT 2010 12 22 13 34 55 31.3200 -97.3300 251.000 122.0 209.170 4.040 -999.990 -999.990 2.092 ..P WKT 2010 12 22 13 39 55 31.3200 -97.3300 251.000 457.0 185.449 3.710 -999.990 -999.990 1.854 ..P WKT 2010 12 22 13 44 55 31.3200 -97.3300 251.000 30.0 203.296 3.680 -999.990 -999.990 2.033 ..P WKT 2010 12 22 13 49 55 31.3200 -97.3300 251.000 122.0 203.291 3.880 -999.990 -999.990 2.033 ..P WKT 2010 12 22 13 54 55 31.3200 -97.3300 251.000 457.0 173.975 3.450 -999.990 -999.990 1.740 ..P WKT 2010 12 22 14 04 55 31.3200 -97.3300 251.000 30.0 198.897 5.290 -999.990 -999.990 1.989 ..P WKT 2010 12 22 14 09 55 31.3200 -97.3300 251.000 122.0 193.981 3.450 -999.990 -999.990 1.940 ..P WKT 2010 12 22 14 14 55 31.3200 -97.3300 251.000 457.0 178.140 3.290 -999.990 -999.990 1.781 ..P WKT 2010 12 22 14 19 55 31.3200 -97.3300 251.000 30.0 202.269 3.340 -999.990 -999.990 2.023 ..P WKT 2010 12 22 14 24 55 31.3200 -97.3300 251.000 122.0 196.020 3.640 -999.990 -999.990 1.960 ..P WKT 2010 12 22 14 29 55 31.3200 -97.3300 251.000 457.0 172.985 4.040 -999.990 -999.990 1.730 ..P WKT 2010 12 22 14 39 55 31.3200 -97.3300 251.000 30.0 200.229 4.590 -999.990 -999.990 2.002 ..P WKT 2010 12 22 14 44 55 31.3200 -97.3300 251.000 122.0 198.016 3.650 -999.990 -999.990 1.980 ..P WKT 2010 12 22 14 49 55 31.3200 -97.3300 251.000 457.0 174.487 5.040 -999.990 -999.990 1.745 ..P WKT 2010 12 22 14 54 55 31.3200 -97.3300 251.000 30.0 199.451 3.400 -999.990 -999.990 1.995 ..P WKT 2010 12 22 14 59 55 31.3200 -97.3300 251.000 122.0 197.504 3.490 -999.990 -999.990 1.975 ..P WKT 2010 12 22 15 04 55 31.3200 -97.3300 251.000 457.0 161.453 3.370 -999.990 -999.990 1.615 ..P WKT 2010 12 22 15 14 55 31.3200 -97.3300 251.000 30.0 196.213 4.540 -999.990 -999.990 1.962 ..P WKT 2010 12 22 15 19 55 31.3200 -97.3300 251.000 122.0 194.685 4.380 -999.990 -999.990 1.947 ..P WKT 2010 12 22 15 24 55 31.3200 -97.3300 251.000 457.0 163.449 4.680 -999.990 -999.990 1.634 ..P WKT 2010 12 22 15 29 55 31.3200 -97.3300 251.000 30.0 197.756 3.870 -999.990 -999.990 1.978 ..P WKT 2010 12 22 15 34 55 31.3200 -97.3300 251.000 122.0 195.030 4.030 -999.990 -999.990 1.950 ..P WKT 2010 12 22 15 39 55 31.3200 -97.3300 251.000 457.0 168.191 4.380 -999.990 -999.990 1.682 ..P WKT 2010 12 22 15 49 55 31.3200 -97.3300 251.000 30.0 191.683 3.940 -999.990 -999.990 1.917 ..P WKT 2010 12 22 15 54 55 31.3200 -97.3300 251.000 122.0 197.654 4.390 -999.990 -999.990 1.977 ..P WKT 2010 12 22 15 59 55 31.3200 -97.3300 251.000 457.0 171.918 4.030 -999.990 -999.990 1.719 ..P WKT 2010 12 22 16 04 55 31.3200 -97.3300 251.000 30.0 203.332 5.190 -999.990 -999.990 2.033 ..P WKT 2010 12 22 16 09 55 31.3200 -97.3300 251.000 122.0 199.844 3.800 -999.990 -999.990 1.998 ..P WKT 2010 12 22 16 14 55 31.3200 -97.3300 251.000 457.0 170.779 4.440 -999.990 -999.990 1.708 ..P WKT 2010 12 22 16 24 55 31.3200 -97.3300 251.000 30.0 201.693 3.730 -999.990 -999.990 2.017 ..P WKT 2010 12 22 16 29 55 31.3200 -97.3300 251.000 122.0 203.324 3.690 -999.990 -999.990 2.033 ..P WKT 2010 12 22 16 34 55 31.3200 -97.3300 251.000 457.0 168.855 3.530 -999.990 -999.990 1.689 ..P WKT 2010 12 22 16 39 55 31.3200 -97.3300 251.000 30.0 198.460 3.890 -999.990 -999.990 1.985 ..P WKT 2010 12 22 16 44 55 31.3200 -97.3300 251.000 122.0 202.089 3.820 -999.990 -999.990 2.021 ..P WKT 2010 12 22 16 49 55 31.3200 -97.3300 251.000 457.0 184.272 5.020 -999.990 -999.990 1.843 ..P WKT 2010 12 22 17 04 55 31.3200 -97.3300 251.000 30.0 205.740 5.090 -999.990 -999.990 2.057 ..P WKT 2010 12 22 17 09 55 31.3200 -97.3300 251.000 122.0 205.335 4.720 -999.990 -999.990 2.053 ..P WKT 2010 12 22 17 14 55 31.3200 -97.3300 251.000 457.0 189.478 4.450 -999.990 -999.990 1.895 ..P WKT 2010 12 22 17 19 55 31.3200 -97.3300 251.000 30.0 205.324 4.130 -999.990 -999.990 2.053 ..P WKT 2010 12 22 17 24 55 31.3200 -97.3300 251.000 122.0 203.587 4.180 -999.990 -999.990 2.036 ..P WKT 2010 12 22 17 29 55 31.3200 -97.3300 251.000 457.0 193.058 4.220 -999.990 -999.990 1.931 ..P WKT 2010 12 22 17 39 55 31.3200 -97.3300 251.000 30.0 204.331 6.010 -999.990 -999.990 2.043 ..P WKT 2010 12 22 17 44 55 31.3200 -97.3300 251.000 122.0 205.087 3.910 -999.990 -999.990 2.051 ..P WKT 2010 12 22 17 49 55 31.3200 -97.3300 251.000 457.0 198.116 4.580 -999.990 -999.990 1.981 ..P WKT 2010 12 22 17 54 55 31.3200 -97.3300 251.000 30.0 201.270 3.750 -999.990 -999.990 2.013 ..P WKT 2010 12 22 17 59 55 31.3200 -97.3300 251.000 122.0 203.091 3.830 -999.990 -999.990 2.031 ..P WKT 2010 12 22 18 04 55 31.3200 -97.3300 251.000 457.0 197.985 5.040 -999.990 -999.990 1.980 ..P WKT 2010 12 22 18 14 55 31.3200 -97.3300 251.000 30.0 199.154 3.600 -999.990 -999.990 1.992 ..P WKT 2010 12 22 18 19 55 31.3200 -97.3300 251.000 122.0 195.572 3.510 -999.990 -999.990 1.956 ..P WKT 2010 12 22 18 24 55 31.3200 -97.3300 251.000 457.0 192.788 3.700 -999.990 -999.990 1.928 ..P WKT 2010 12 22 18 29 55 31.3200 -97.3300 251.000 30.0 195.865 4.200 -999.990 -999.990 1.959 ..P WKT 2010 12 22 18 34 55 31.3200 -97.3300 251.000 122.0 198.942 4.900 -999.990 -999.990 1.989 ..P WKT 2010 12 22 18 39 55 31.3200 -97.3300 251.000 457.0 200.421 4.440 -999.990 -999.990 2.004 ..P WKT 2010 12 22 18 49 55 31.3200 -97.3300 251.000 30.0 202.826 5.500 -999.990 -999.990 2.028 ..P WKT 2010 12 22 18 54 55 31.3200 -97.3300 251.000 122.0 199.225 4.730 -999.990 -999.990 1.992 ..P WKT 2010 12 22 18 59 55 31.3200 -97.3300 251.000 457.0 188.431 5.280 -999.990 -999.990 1.884 ..P WKT 2010 12 22 19 04 55 31.3200 -97.3300 251.000 30.0 195.751 4.380 -999.990 -999.990 1.958 ..P WKT 2010 12 22 19 09 55 31.3200 -97.3300 251.000 122.0 191.882 4.340 -999.990 -999.990 1.919 ..P WKT 2010 12 22 19 14 55 31.3200 -97.3300 251.000 457.0 190.678 4.190 -999.990 -999.990 1.907 ..P WKT 2010 12 22 19 24 55 31.3200 -97.3300 251.000 30.0 189.811 5.150 -999.990 -999.990 1.898 ..P WKT 2010 12 22 19 29 55 31.3200 -97.3300 251.000 122.0 200.137 4.340 -999.990 -999.990 2.001 ..P WKT 2010 12 22 19 34 55 31.3200 -97.3300 251.000 457.0 185.690 4.510 -999.990 -999.990 1.857 ..P WKT 2010 12 22 19 39 55 31.3200 -97.3300 251.000 30.0 200.545 5.110 -999.990 -999.990 2.005 ..P WKT 2010 12 22 19 44 55 31.3200 -97.3300 251.000 122.0 201.681 5.480 -999.990 -999.990 2.017 ..P WKT 2010 12 22 19 49 55 31.3200 -97.3300 251.000 457.0 195.359 4.130 -999.990 -999.990 1.954 ..P WKT 2010 12 22 19 59 55 31.3200 -97.3300 251.000 30.0 205.888 4.430 -999.990 -999.990 2.059 ..P WKT 2010 12 22 20 04 55 31.3200 -97.3300 251.000 122.0 206.226 4.650 -999.990 -999.990 2.062 ..P WKT 2010 12 22 20 09 55 31.3200 -97.3300 251.000 457.0 204.698 5.270 -999.990 -999.990 2.047 ..P WKT 2010 12 22 20 14 55 31.3200 -97.3300 251.000 30.0 209.296 5.920 -999.990 -999.990 2.093 ..P WKT 2010 12 22 20 19 55 31.3200 -97.3300 251.000 122.0 206.038 6.440 -999.990 -999.990 2.060 ..P WKT 2010 12 22 20 24 55 31.3200 -97.3300 251.000 457.0 201.714 6.490 -999.990 -999.990 2.017 ..P WKT 2010 12 22 20 34 55 31.3200 -97.3300 251.000 30.0 219.187 7.340 -999.990 -999.990 2.192 ..P WKT 2010 12 22 20 39 55 31.3200 -97.3300 251.000 122.0 213.816 6.870 -999.990 -999.990 2.138 ..P WKT 2010 12 22 20 44 55 31.3200 -97.3300 251.000 457.0 213.373 7.270 -999.990 -999.990 2.134 ..P WKT 2010 12 22 20 49 55 31.3200 -97.3300 251.000 30.0 214.928 6.520 -999.990 -999.990 2.149 ..P WKT 2010 12 22 20 54 55 31.3200 -97.3300 251.000 122.0 210.089 6.680 -999.990 -999.990 2.101 ..P WKT 2010 12 22 20 59 55 31.3200 -97.3300 251.000 457.0 204.186 6.440 -999.990 -999.990 2.042 ..P WKT 2010 12 22 21 09 55 31.3200 -97.3300 251.000 30.0 209.235 6.470 -999.990 -999.990 2.092 ..P WKT 2010 12 22 21 14 55 31.3200 -97.3300 251.000 122.0 214.595 5.850 -999.990 -999.990 2.146 ..P WKT 2010 12 22 21 19 55 31.3200 -97.3300 251.000 457.0 212.497 5.790 -999.990 -999.990 2.125 ..P WKT 2010 12 22 21 24 55 31.3200 -97.3300 251.000 30.0 209.866 5.290 -999.990 -999.990 2.099 ..P WKT 2010 12 22 21 29 55 31.3200 -97.3300 251.000 122.0 215.225 5.390 -999.990 -999.990 2.152 ..P WKT 2010 12 22 21 34 55 31.3200 -97.3300 251.000 457.0 213.393 5.880 -999.990 -999.990 2.134 ..P WKT 2010 12 22 21 44 55 31.3200 -97.3300 251.000 30.0 217.491 4.770 -999.990 -999.990 2.175 ..P WKT 2010 12 22 21 49 55 31.3200 -97.3300 251.000 122.0 220.491 4.520 -999.990 -999.990 2.205 ..P WKT 2010 12 22 21 54 55 31.3200 -97.3300 251.000 457.0 226.955 4.700 -999.990 -999.990 2.270 ..P WKT 2010 12 22 21 59 55 31.3200 -97.3300 251.000 30.0 218.236 4.610 -999.990 -999.990 2.182 ..P WKT 2010 12 22 22 04 55 31.3200 -97.3300 251.000 122.0 220.171 5.710 -999.990 -999.990 2.202 ..P WKT 2010 12 22 22 09 55 31.3200 -97.3300 251.000 457.0 210.919 4.030 -999.990 -999.990 2.109 ..P WKT 2010 12 22 22 19 55 31.3200 -97.3300 251.000 30.0 206.990 3.920 -999.990 -999.990 2.070 ..P WKT 2010 12 22 22 24 55 31.3200 -97.3300 251.000 122.0 208.582 4.100 -999.990 -999.990 2.086 ..P WKT 2010 12 22 22 29 55 31.3200 -97.3300 251.000 457.0 213.637 3.950 -999.990 -999.990 2.136 ..P WKT 2010 12 22 22 34 55 31.3200 -97.3300 251.000 30.0 215.762 4.330 -999.990 -999.990 2.158 ..P WKT 2010 12 22 22 39 55 31.3200 -97.3300 251.000 122.0 211.229 4.240 -999.990 -999.990 2.112 ..P WKT 2010 12 22 22 44 55 31.3200 -97.3300 251.000 457.0 208.826 4.090 -999.990 -999.990 2.088 ..P WKT 2010 12 22 22 54 55 31.3200 -97.3300 251.000 30.0 208.073 5.220 -999.990 -999.990 2.081 ..P WKT 2010 12 22 22 59 55 31.3200 -97.3300 251.000 122.0 207.059 4.360 -999.990 -999.990 2.071 ..P WKT 2010 12 22 23 04 55 31.3200 -97.3300 251.000 457.0 203.382 4.440 -999.990 -999.990 2.034 ..P WKT 2010 12 22 23 09 55 31.3200 -97.3300 251.000 30.0 201.036 4.560 -999.990 -999.990 2.010 ..P WKT 2010 12 22 23 14 55 31.3200 -97.3300 251.000 122.0 208.279 4.740 -999.990 -999.990 2.083 ..P WKT 2010 12 22 23 19 55 31.3200 -97.3300 251.000 457.0 202.472 6.070 -999.990 -999.990 2.025 ..P WKT 2010 12 22 23 29 55 31.3200 -97.3300 251.000 30.0 202.118 5.970 -999.990 -999.990 2.021 ..P WKT 2010 12 22 23 34 55 31.3200 -97.3300 251.000 122.0 204.376 4.980 -999.990 -999.990 2.044 ..P WKT 2010 12 22 23 39 55 31.3200 -97.3300 251.000 457.0 200.375 4.870 -999.990 -999.990 2.004 ..P WKT 2010 12 22 23 44 55 31.3200 -97.3300 251.000 30.0 195.710 4.750 -999.990 -999.990 1.957 ..P WKT 2010 12 22 23 49 55 31.3200 -97.3300 251.000 122.0 208.088 5.100 -999.990 -999.990 2.081 ..P WKT 2010 12 23 00 09 55 31.3200 -97.3300 251.000 457.0 196.215 4.310 -999.990 -999.990 1.962 ..P WKT 2010 12 23 00 10 25 31.3200 -97.3300 251.000 457.0 195.243 4.390 -999.990 -999.990 1.952 ..P WKT 2010 12 23 00 10 55 31.3200 -97.3300 251.000 457.0 188.679 3.880 -999.990 -999.990 1.887 ..P WKT 2010 12 23 00 11 25 31.3200 -97.3300 251.000 457.0 193.566 4.530 -999.990 -999.990 1.936 ..P WKT 2010 12 23 00 11 55 31.3200 -97.3300 251.000 457.0 199.919 3.930 -999.990 -999.990 1.999 ..P WKT 2010 12 23 00 12 25 31.3200 -97.3300 251.000 457.0 200.811 3.960 -999.990 -999.990 2.008 ..P WKT 2010 12 23 00 12 55 31.3200 -97.3300 251.000 457.0 196.777 3.990 -999.990 -999.990 1.968 ..P WKT 2010 12 23 00 13 25 31.3200 -97.3300 251.000 457.0 194.074 3.860 -999.990 -999.990 1.941 ..P WKT 2010 12 23 00 13 55 31.3200 -97.3300 251.000 457.0 193.236 4.450 -999.990 -999.990 1.932 ..P WKT 2010 12 23 00 14 25 31.3200 -97.3300 251.000 457.0 190.533 3.930 -999.990 -999.990 1.905 ..P WKT 2010 12 23 00 14 55 31.3200 -97.3300 251.000 457.0 193.157 3.810 -999.990 -999.990 1.932 ..P WKT 2010 12 23 00 19 55 31.3200 -97.3300 251.000 30.0 193.561 6.200 -999.990 -999.990 1.936 ..P WKT 2010 12 23 00 24 55 31.3200 -97.3300 251.000 122.0 201.422 5.100 -999.990 -999.990 2.014 ..P WKT 2010 12 23 00 29 55 31.3200 -97.3300 251.000 457.0 174.528 4.800 -999.990 -999.990 1.745 ..P WKT 2010 12 23 00 34 55 31.3200 -97.3300 251.000 30.0 197.037 4.790 -999.990 -999.990 1.970 ..P WKT 2010 12 23 00 39 55 31.3200 -97.3300 251.000 122.0 196.908 4.660 -999.990 -999.990 1.969 ..P WKT 2010 12 23 00 44 55 31.3200 -97.3300 251.000 457.0 181.865 3.830 -999.990 -999.990 1.819 ..P WKT 2010 12 23 00 54 55 31.3200 -97.3300 251.000 30.0 189.012 4.160 -999.990 -999.990 1.890 ..P WKT 2010 12 23 00 59 55 31.3200 -97.3300 251.000 122.0 186.034 4.280 -999.990 -999.990 1.860 ..P WKT 2010 12 23 01 04 55 31.3200 -97.3300 251.000 457.0 169.072 4.740 -999.990 -999.990 1.691 ..P WKT 2010 12 23 01 09 55 31.3200 -97.3300 251.000 30.0 182.475 6.220 -999.990 -999.990 1.825 ..P WKT 2010 12 23 01 14 55 31.3200 -97.3300 251.000 122.0 191.083 4.240 -999.990 -999.990 1.911 ..P WKT 2010 12 23 01 19 55 31.3200 -97.3300 251.000 457.0 188.504 5.140 -999.990 -999.990 1.885 ..P WKT 2010 12 23 01 29 55 31.3200 -97.3300 251.000 30.0 186.904 4.430 -999.990 -999.990 1.869 ..P WKT 2010 12 23 01 34 55 31.3200 -97.3300 251.000 122.0 192.411 5.380 -999.990 -999.990 1.924 ..P WKT 2010 12 23 01 39 55 31.3200 -97.3300 251.000 457.0 189.395 4.370 -999.990 -999.990 1.894 ..P WKT 2010 12 23 01 44 55 31.3200 -97.3300 251.000 30.0 191.706 4.880 -999.990 -999.990 1.917 ..P WKT 2010 12 23 01 49 55 31.3200 -97.3300 251.000 122.0 188.157 4.860 -999.990 -999.990 1.882 ..P WKT 2010 12 23 01 54 55 31.3200 -97.3300 251.000 457.0 196.594 5.270 -999.990 -999.990 1.966 ..P WKT 2010 12 23 02 04 55 31.3200 -97.3300 251.000 30.0 202.929 5.920 -999.990 -999.990 2.029 ..P WKT 2010 12 23 02 09 55 31.3200 -97.3300 251.000 122.0 191.502 4.470 -999.990 -999.990 1.915 ..P WKT 2010 12 23 02 14 55 31.3200 -97.3300 251.000 457.0 193.662 4.340 -999.990 -999.990 1.937 ..P WKT 2010 12 23 02 19 55 31.3200 -97.3300 251.000 30.0 199.017 4.600 -999.990 -999.990 1.990 ..P WKT 2010 12 23 02 24 55 31.3200 -97.3300 251.000 122.0 207.303 4.540 -999.990 -999.990 2.073 ..P WKT 2010 12 23 02 29 55 31.3200 -97.3300 251.000 457.0 187.085 4.010 -999.990 -999.990 1.871 ..P WKT 2010 12 23 02 39 55 31.3200 -97.3300 251.000 30.0 214.199 4.310 -999.990 -999.990 2.142 ..P WKT 2010 12 23 02 44 55 31.3200 -97.3300 251.000 122.0 222.638 4.390 -999.990 -999.990 2.226 ..P WKT 2010 12 23 02 49 55 31.3200 -97.3300 251.000 457.0 190.050 4.840 -999.990 -999.990 1.901 ..P WKT 2010 12 23 02 54 55 31.3200 -97.3300 251.000 30.0 220.867 4.840 -999.990 -999.990 2.209 ..P WKT 2010 12 23 02 59 55 31.3200 -97.3300 251.000 122.0 223.978 5.130 -999.990 -999.990 2.240 ..P WKT 2010 12 23 03 04 55 31.3200 -97.3300 251.000 457.0 200.181 5.450 -999.990 -999.990 2.002 ..P WKT 2010 12 23 03 14 55 31.3200 -97.3300 251.000 30.0 226.117 5.850 -999.990 -999.990 2.261 ..P WKT 2010 12 23 03 19 55 31.3200 -97.3300 251.000 122.0 217.372 4.810 -999.990 -999.990 2.174 ..P WKT 2010 12 23 03 24 55 31.3200 -97.3300 251.000 457.0 199.702 4.990 -999.990 -999.990 1.997 ..P WKT 2010 12 23 03 29 55 31.3200 -97.3300 251.000 30.0 233.452 4.780 -999.990 -999.990 2.335 ..P WKT 2010 12 23 03 34 55 31.3200 -97.3300 251.000 122.0 228.571 4.990 -999.990 -999.990 2.286 ..P WKT 2010 12 23 03 39 55 31.3200 -97.3300 251.000 457.0 195.714 4.410 -999.990 -999.990 1.957 ..P WKT 2010 12 23 03 49 55 31.3200 -97.3300 251.000 30.0 231.281 5.600 -999.990 -999.990 2.313 ..P WKT 2010 12 23 03 54 55 31.3200 -97.3300 251.000 122.0 216.846 4.630 -999.990 -999.990 2.168 ..P WKT 2010 12 23 03 59 55 31.3200 -97.3300 251.000 457.0 200.811 7.050 -999.990 -999.990 2.008 ..P WKT 2010 12 23 04 04 55 31.3200 -97.3300 251.000 30.0 226.341 4.670 -999.990 -999.990 2.263 ..P WKT 2010 12 23 04 09 55 31.3200 -97.3300 251.000 122.0 201.514 4.830 -999.990 -999.990 2.015 ..P WKT 2010 12 23 04 14 55 31.3200 -97.3300 251.000 457.0 204.263 5.000 -999.990 -999.990 2.043 ..P WKT 2010 12 23 04 24 55 31.3200 -97.3300 251.000 30.0 226.568 5.350 -999.990 -999.990 2.266 ..P WKT 2010 12 23 04 29 55 31.3200 -97.3300 251.000 122.0 205.488 4.970 -999.990 -999.990 2.055 ..P WKT 2010 12 23 04 34 55 31.3200 -97.3300 251.000 457.0 202.395 5.310 -999.990 -999.990 2.024 ..P WKT 2010 12 23 04 39 55 31.3200 -97.3300 251.000 30.0 216.089 6.140 -999.990 -999.990 2.161 ..P WKT 2010 12 23 04 44 55 31.3200 -97.3300 251.000 122.0 200.472 5.310 -999.990 -999.990 2.005 ..P WKT 2010 12 23 04 49 55 31.3200 -97.3300 251.000 457.0 196.712 4.720 -999.990 -999.990 1.967 ..P WKT 2010 12 23 05 04 55 31.3200 -97.3300 251.000 30.0 217.414 5.540 -999.990 -999.990 2.174 ..P WKT 2010 12 23 05 09 55 31.3200 -97.3300 251.000 122.0 202.931 5.280 -999.990 -999.990 2.029 ..P WKT 2010 12 23 05 14 55 31.3200 -97.3300 251.000 457.0 205.502 6.710 -999.990 -999.990 2.055 ..P WKT 2010 12 23 05 19 55 31.3200 -97.3300 251.000 30.0 208.340 4.720 -999.990 -999.990 2.083 ..P WKT 2010 12 23 05 24 55 31.3200 -97.3300 251.000 122.0 210.112 4.750 -999.990 -999.990 2.101 ..P WKT 2010 12 23 05 29 55 31.3200 -97.3300 251.000 457.0 195.628 4.640 -999.990 -999.990 1.956 ..P WKT 2010 12 23 05 39 55 31.3200 -97.3300 251.000 30.0 221.945 4.800 -999.990 -999.990 2.219 ..P WKT 2010 12 23 05 44 55 31.3200 -97.3300 251.000 122.0 213.978 5.260 -999.990 -999.990 2.140 ..P WKT 2010 12 23 05 49 55 31.3200 -97.3300 251.000 457.0 201.214 5.290 -999.990 -999.990 2.012 ..P WKT 2010 12 23 05 54 55 31.3200 -97.3300 251.000 30.0 218.564 5.680 -999.990 -999.990 2.186 ..P WKT 2010 12 23 05 59 55 31.3200 -97.3300 251.000 122.0 214.062 5.170 -999.990 -999.990 2.141 ..P WKT 2010 12 23 06 04 55 31.3200 -97.3300 251.000 457.0 198.100 4.630 -999.990 -999.990 1.981 ..P WKT 2010 12 23 06 14 55 31.3200 -97.3300 251.000 30.0 213.536 4.820 -999.990 -999.990 2.135 ..P WKT 2010 12 23 06 19 55 31.3200 -97.3300 251.000 122.0 211.623 5.930 -999.990 -999.990 2.116 ..P WKT 2010 12 23 06 24 55 31.3200 -97.3300 251.000 457.0 196.917 5.580 -999.990 -999.990 1.969 ..P WKT 2010 12 23 06 29 55 31.3200 -97.3300 251.000 30.0 195.002 6.240 -999.990 -999.990 1.950 ..P WKT 2010 12 23 06 34 55 31.3200 -97.3300 251.000 122.0 205.615 5.470 -999.990 -999.990 2.056 ..P WKT 2010 12 23 06 39 55 31.3200 -97.3300 251.000 457.0 167.988 5.770 -999.990 -999.990 1.680 ..P WKT 2010 12 23 06 49 55 31.3200 -97.3300 251.000 30.0 200.692 5.840 -999.990 -999.990 2.007 ..P WKT 2010 12 23 06 54 55 31.3200 -97.3300 251.000 122.0 198.796 5.850 -999.990 -999.990 1.988 ..P WKT 2010 12 23 06 59 55 31.3200 -97.3300 251.000 457.0 189.572 6.290 -999.990 -999.990 1.896 ..P WKT 2010 12 23 07 04 55 31.3200 -97.3300 251.000 30.0 193.141 5.670 -999.990 -999.990 1.931 ..P WKT 2010 12 23 07 09 55 31.3200 -97.3300 251.000 122.0 194.844 5.410 -999.990 -999.990 1.948 ..P WKT 2010 12 23 07 14 55 31.3200 -97.3300 251.000 457.0 190.017 5.000 -999.990 -999.990 1.900 ..P WKT 2010 12 23 07 24 55 31.3200 -97.3300 251.000 30.0 192.014 5.120 -999.990 -999.990 1.920 ..P WKT 2010 12 23 07 29 55 31.3200 -97.3300 251.000 122.0 191.109 5.590 -999.990 -999.990 1.911 ..P WKT 2010 12 23 07 34 55 31.3200 -97.3300 251.000 457.0 188.205 5.580 -999.990 -999.990 1.882 ..P WKT 2010 12 23 07 39 55 31.3200 -97.3300 251.000 30.0 186.101 5.710 -999.990 -999.990 1.861 ..P WKT 2010 12 23 07 44 55 31.3200 -97.3300 251.000 122.0 184.929 5.300 -999.990 -999.990 1.849 ..P WKT 2010 12 23 07 49 55 31.3200 -97.3300 251.000 457.0 185.357 5.500 -999.990 -999.990 1.854 ..P WKT 2010 12 23 07 59 55 31.3200 -97.3300 251.000 30.0 168.409 5.390 -999.990 -999.990 1.684 ..P WKT 2010 12 23 08 04 55 31.3200 -97.3300 251.000 122.0 170.627 5.780 -999.990 -999.990 1.706 ..P WKT 2010 12 23 08 09 55 31.3200 -97.3300 251.000 457.0 185.105 6.220 -999.990 -999.990 1.851 ..P WKT 2010 12 23 08 14 55 31.3200 -97.3300 251.000 30.0 168.264 6.520 -999.990 -999.990 1.683 ..P WKT 2010 12 23 08 19 55 31.3200 -97.3300 251.000 122.0 168.748 5.490 -999.990 -999.990 1.687 ..P WKT 2010 12 23 08 24 55 31.3200 -97.3300 251.000 457.0 182.161 5.000 -999.990 -999.990 1.822 ..P WKT 2010 12 23 08 34 55 31.3200 -97.3300 251.000 30.0 167.307 5.230 -999.990 -999.990 1.673 ..P WKT 2010 12 23 08 39 55 31.3200 -97.3300 251.000 122.0 171.162 4.800 -999.990 -999.990 1.712 ..P WKT 2010 12 23 08 44 55 31.3200 -97.3300 251.000 457.0 186.346 4.880 -999.990 -999.990 1.863 ..P WKT 2010 12 23 08 49 55 31.3200 -97.3300 251.000 30.0 172.074 4.910 -999.990 -999.990 1.721 ..P WKT 2010 12 23 08 54 55 31.3200 -97.3300 251.000 122.0 165.666 5.490 -999.990 -999.990 1.657 ..P WKT 2010 12 23 08 59 55 31.3200 -97.3300 251.000 457.0 196.979 4.930 -999.990 -999.990 1.970 ..P WKT 2010 12 23 09 09 55 31.3200 -97.3300 251.000 30.0 166.491 5.220 -999.990 -999.990 1.665 ..P WKT 2010 12 23 09 14 55 31.3200 -97.3300 251.000 122.0 165.071 5.460 -999.990 -999.990 1.651 ..P WKT 2010 12 23 09 19 55 31.3200 -97.3300 251.000 457.0 196.709 5.250 -999.990 -999.990 1.967 ..P WKT 2010 12 23 09 24 55 31.3200 -97.3300 251.000 30.0 162.232 5.130 -999.990 -999.990 1.622 ..P WKT 2010 12 23 09 29 55 31.3200 -97.3300 251.000 122.0 167.477 5.180 -999.990 -999.990 1.675 ..P WKT 2010 12 23 09 34 55 31.3200 -97.3300 251.000 457.0 192.451 5.080 -999.990 -999.990 1.925 ..P WKT 2010 12 23 09 44 55 31.3200 -97.3300 251.000 30.0 169.502 5.220 -999.990 -999.990 1.695 ..P WKT 2010 12 23 09 49 55 31.3200 -97.3300 251.000 122.0 173.566 5.050 -999.990 -999.990 1.736 ..P WKT 2010 12 23 09 54 55 31.3200 -97.3300 251.000 457.0 194.695 5.490 -999.990 -999.990 1.947 ..P WKT 2010 12 23 09 59 55 31.3200 -97.3300 251.000 30.0 163.833 5.170 -999.990 -999.990 1.638 ..P WKT 2010 12 23 10 04 55 31.3200 -97.3300 251.000 122.0 172.164 5.290 -999.990 -999.990 1.722 ..P WKT 2010 12 23 10 09 55 31.3200 -97.3300 251.000 457.0 193.025 4.990 -999.990 -999.990 1.930 ..P WKT 2010 12 23 10 19 55 31.3200 -97.3300 251.000 30.0 165.048 4.740 -999.990 -999.990 1.650 ..P WKT 2010 12 23 10 24 55 31.3200 -97.3300 251.000 122.0 172.198 4.990 -999.990 -999.990 1.722 ..P WKT 2010 12 23 10 29 55 31.3200 -97.3300 251.000 457.0 202.278 5.560 -999.990 -999.990 2.023 ..P WKT 2010 12 23 10 34 55 31.3200 -97.3300 251.000 30.0 171.834 5.100 -999.990 -999.990 1.718 ..P WKT 2010 12 23 10 39 55 31.3200 -97.3300 251.000 122.0 172.585 5.110 -999.990 -999.990 1.726 ..P WKT 2010 12 23 10 44 55 31.3200 -97.3300 251.000 457.0 200.000 5.370 -999.990 -999.990 2.000 ..P WKT 2010 12 23 10 54 55 31.3200 -97.3300 251.000 30.0 170.820 5.980 -999.990 -999.990 1.708 ..P WKT 2010 12 23 10 59 55 31.3200 -97.3300 251.000 122.0 170.619 5.190 -999.990 -999.990 1.706 ..P WKT 2010 12 23 11 04 55 31.3200 -97.3300 251.000 457.0 197.483 5.990 -999.990 -999.990 1.975 ..P WKT 2010 12 23 11 09 55 31.3200 -97.3300 251.000 30.0 167.418 5.870 -999.990 -999.990 1.674 ..P WKT 2010 12 23 11 14 55 31.3200 -97.3300 251.000 122.0 165.484 5.200 -999.990 -999.990 1.655 ..P WKT 2010 12 23 11 19 55 31.3200 -97.3300 251.000 457.0 194.348 5.790 -999.990 -999.990 1.943 ..P WKT 2010 12 23 11 29 55 31.3200 -97.3300 251.000 30.0 170.955 5.280 -999.990 -999.990 1.710 ..P WKT 2010 12 23 11 34 55 31.3200 -97.3300 251.000 122.0 176.694 5.540 -999.990 -999.990 1.767 ..P WKT 2010 12 23 11 39 55 31.3200 -97.3300 251.000 457.0 197.899 5.300 -999.990 -999.990 1.979 ..P WKT 2010 12 23 11 44 55 31.3200 -97.3300 251.000 30.0 171.506 5.300 -999.990 -999.990 1.715 ..P WKT 2010 12 23 11 49 55 31.3200 -97.3300 251.000 122.0 177.246 5.960 -999.990 -999.990 1.772 ..P WKT 2010 12 23 12 09 55 31.3200 -97.3300 251.000 457.0 196.324 6.420 -999.990 -999.990 1.963 ..P WKT 2010 12 23 12 10 25 31.3200 -97.3300 251.000 457.0 200.041 5.600 -999.990 -999.990 2.000 ..P WKT 2010 12 23 12 10 55 31.3200 -97.3300 251.000 457.0 197.759 6.610 -999.990 -999.990 1.978 ..P WKT 2010 12 23 12 11 25 31.3200 -97.3300 251.000 457.0 190.411 5.610 -999.990 -999.990 1.904 ..P WKT 2010 12 23 12 11 55 31.3200 -97.3300 251.000 457.0 193.063 5.450 -999.990 -999.990 1.931 ..P WKT 2010 12 23 12 12 25 31.3200 -97.3300 251.000 457.0 197.713 5.990 -999.990 -999.990 1.977 ..P WKT 2010 12 23 12 12 55 31.3200 -97.3300 251.000 457.0 196.631 5.930 -999.990 -999.990 1.966 ..P WKT 2010 12 23 12 13 25 31.3200 -97.3300 251.000 457.0 192.749 5.890 -999.990 -999.990 1.927 ..P WKT 2010 12 23 12 13 55 31.3200 -97.3300 251.000 457.0 195.933 6.460 -999.990 -999.990 1.959 ..P WKT 2010 12 23 12 14 25 31.3200 -97.3300 251.000 457.0 202.450 5.660 -999.990 -999.990 2.024 ..P WKT 2010 12 23 12 14 55 31.3200 -97.3300 251.000 457.0 205.368 6.010 -999.990 -999.990 2.054 ..P WKT 2010 12 23 12 19 55 31.3200 -97.3300 251.000 30.0 174.820 5.790 -999.990 -999.990 1.748 ..P WKT 2010 12 23 12 24 55 31.3200 -97.3300 251.000 122.0 173.467 5.730 -999.990 -999.990 1.735 ..P WKT 2010 12 23 12 29 55 31.3200 -97.3300 251.000 457.0 198.505 6.300 -999.990 -999.990 1.985 ..P WKT 2010 12 23 12 34 55 31.3200 -97.3300 251.000 30.0 174.892 6.420 -999.990 -999.990 1.749 ..P WKT 2010 12 23 12 39 55 31.3200 -97.3300 251.000 122.0 182.869 5.840 -999.990 -999.990 1.829 ..P WKT 2010 12 23 12 44 55 31.3200 -97.3300 251.000 457.0 201.106 5.930 -999.990 -999.990 2.011 ..P WKT 2010 12 23 12 54 55 31.3200 -97.3300 251.000 30.0 174.503 5.990 -999.990 -999.990 1.745 ..P WKT 2010 12 23 12 59 55 31.3200 -97.3300 251.000 122.0 178.571 7.000 -999.990 -999.990 1.786 ..P WKT 2010 12 23 13 04 55 31.3200 -97.3300 251.000 457.0 206.356 5.640 -999.990 -999.990 2.064 ..P WKT 2010 12 23 13 09 55 31.3200 -97.3300 251.000 30.0 170.986 5.960 -999.990 -999.990 1.710 ..P WKT 2010 12 23 13 14 55 31.3200 -97.3300 251.000 122.0 172.656 5.880 -999.990 -999.990 1.727 ..P WKT 2010 12 23 13 19 55 31.3200 -97.3300 251.000 457.0 194.574 5.400 -999.990 -999.990 1.946 ..P WKT 2010 12 23 13 29 55 31.3200 -97.3300 251.000 30.0 182.877 5.280 -999.990 -999.990 1.829 ..P WKT 2010 12 23 13 34 55 31.3200 -97.3300 251.000 122.0 178.838 5.340 -999.990 -999.990 1.788 ..P WKT 2010 12 23 13 39 55 31.3200 -97.3300 251.000 457.0 195.576 5.570 -999.990 -999.990 1.956 ..P WKT 2010 12 23 13 44 55 31.3200 -97.3300 251.000 30.0 182.746 5.410 -999.990 -999.990 1.827 ..P WKT 2010 12 23 13 49 55 31.3200 -97.3300 251.000 122.0 188.562 5.130 -999.990 -999.990 1.886 ..P WKT 2010 12 23 13 54 55 31.3200 -97.3300 251.000 457.0 194.378 5.400 -999.990 -999.990 1.944 ..P WKT 2010 12 23 14 04 55 31.3200 -97.3300 251.000 30.0 186.109 5.140 -999.990 -999.990 1.861 ..P WKT 2010 12 23 14 09 55 31.3200 -97.3300 251.000 122.0 190.669 5.250 -999.990 -999.990 1.907 ..P WKT 2010 12 23 14 14 55 31.3200 -97.3300 251.000 457.0 192.831 5.290 -999.990 -999.990 1.928 ..P WKT 2010 12 23 14 19 55 31.3200 -97.3300 251.000 30.0 187.537 5.090 -999.990 -999.990 1.875 ..P WKT 2010 12 23 14 24 55 31.3200 -97.3300 251.000 122.0 193.693 6.090 -999.990 -999.990 1.937 ..P WKT 2010 12 23 14 29 55 31.3200 -97.3300 251.000 457.0 197.984 4.930 -999.990 -999.990 1.980 ..P WKT 2010 12 23 14 39 55 31.3200 -97.3300 251.000 30.0 194.796 6.200 -999.990 -999.990 1.948 ..P WKT 2010 12 23 14 44 55 31.3200 -97.3300 251.000 122.0 199.562 5.100 -999.990 -999.990 1.996 ..P WKT 2010 12 23 14 49 55 31.3200 -97.3300 251.000 457.0 193.414 6.020 -999.990 -999.990 1.934 ..P WKT 2010 12 23 14 54 55 31.3200 -97.3300 251.000 30.0 203.903 5.280 -999.990 -999.990 2.039 ..P WKT 2010 12 23 14 59 55 31.3200 -97.3300 251.000 122.0 199.219 5.040 -999.990 -999.990 1.992 ..P WKT 2010 12 23 15 04 55 31.3200 -97.3300 251.000 457.0 190.145 5.050 -999.990 -999.990 1.901 ..P WKT 2010 12 23 15 14 55 31.3200 -97.3300 251.000 30.0 190.779 5.260 -999.990 -999.990 1.908 ..P WKT 2010 12 23 15 19 55 31.3200 -97.3300 251.000 122.0 193.168 5.190 -999.990 -999.990 1.932 ..P WKT 2010 12 23 15 24 55 31.3200 -97.3300 251.000 457.0 178.394 5.450 -999.990 -999.990 1.784 ..P WKT 2010 12 23 15 29 55 31.3200 -97.3300 251.000 30.0 193.022 5.770 -999.990 -999.990 1.930 ..P WKT 2010 12 23 15 34 55 31.3200 -97.3300 251.000 122.0 180.910 6.770 -999.990 -999.990 1.809 ..P WKT 2010 12 23 15 39 55 31.3200 -97.3300 251.000 457.0 184.895 5.710 -999.990 -999.990 1.849 ..P WKT 2010 12 23 15 49 55 31.3200 -97.3300 251.000 30.0 191.173 6.380 -999.990 -999.990 1.912 ..P WKT 2010 12 23 15 54 55 31.3200 -97.3300 251.000 122.0 187.348 6.610 -999.990 -999.990 1.873 ..P WKT 2010 12 23 15 59 55 31.3200 -97.3300 251.000 457.0 188.843 6.500 -999.990 -999.990 1.888 ..P WKT 2010 12 23 16 04 55 31.3200 -97.3300 251.000 30.0 188.077 6.260 -999.990 -999.990 1.881 ..P WKT 2010 12 23 16 09 55 31.3200 -97.3300 251.000 122.0 188.641 6.160 -999.990 -999.990 1.886 ..P WKT 2010 12 23 16 14 55 31.3200 -97.3300 251.000 457.0 191.333 7.440 -999.990 -999.990 1.913 ..P WKT 2010 12 23 16 24 55 31.3200 -97.3300 251.000 30.0 185.128 6.250 -999.990 -999.990 1.851 ..P WKT 2010 12 23 16 29 55 31.3200 -97.3300 251.000 122.0 191.389 6.320 -999.990 -999.990 1.914 ..P WKT 2010 12 23 16 34 55 31.3200 -97.3300 251.000 457.0 180.236 5.800 -999.990 -999.990 1.802 ..P WKT 2010 12 23 16 39 55 31.3200 -97.3300 251.000 30.0 189.687 7.320 -999.990 -999.990 1.897 ..P WKT 2010 12 23 16 44 55 31.3200 -97.3300 251.000 122.0 191.827 6.120 -999.990 -999.990 1.918 ..P WKT 2010 12 23 16 49 55 31.3200 -97.3300 251.000 457.0 178.017 5.580 -999.990 -999.990 1.780 ..P WKT 2010 12 23 17 04 55 31.3200 -97.3300 251.000 30.0 188.717 5.000 -999.990 -999.990 1.887 ..P WKT 2010 12 23 17 09 55 31.3200 -97.3300 251.000 122.0 185.887 5.280 -999.990 -999.990 1.859 ..P WKT 2010 12 23 17 14 55 31.3200 -97.3300 251.000 457.0 190.499 5.700 -999.990 -999.990 1.905 ..P WKT 2010 12 23 17 19 55 31.3200 -97.3300 251.000 30.0 183.949 6.380 -999.990 -999.990 1.839 ..P WKT 2010 12 23 17 24 55 31.3200 -97.3300 251.000 122.0 193.343 5.910 -999.990 -999.990 1.933 ..P WKT 2010 12 23 17 29 55 31.3200 -97.3300 251.000 457.0 191.842 5.570 -999.990 -999.990 1.918 ..P WKT 2010 12 23 17 39 55 31.3200 -97.3300 251.000 30.0 185.363 5.950 -999.990 -999.990 1.854 ..P WKT 2010 12 23 17 44 55 31.3200 -97.3300 251.000 122.0 193.935 5.450 -999.990 -999.990 1.939 ..P WKT 2010 12 23 17 49 55 31.3200 -97.3300 251.000 457.0 191.614 6.350 -999.990 -999.990 1.916 ..P WKT 2010 12 23 17 54 55 31.3200 -97.3300 251.000 30.0 192.214 7.350 -999.990 -999.990 1.922 ..P WKT 2010 12 23 17 59 55 31.3200 -97.3300 251.000 122.0 193.347 6.840 -999.990 -999.990 1.933 ..P WKT 2010 12 23 18 04 55 31.3200 -97.3300 251.000 457.0 198.198 5.610 -999.990 -999.990 1.982 ..P WKT 2010 12 23 18 14 55 31.3200 -97.3300 251.000 30.0 192.588 5.600 -999.990 -999.990 1.926 ..P WKT 2010 12 23 18 19 55 31.3200 -97.3300 251.000 122.0 198.596 6.940 -999.990 -999.990 1.986 ..P WKT 2010 12 23 18 24 55 31.3200 -97.3300 251.000 457.0 189.996 7.570 -999.990 -999.990 1.900 ..P WKT 2010 12 23 18 29 55 31.3200 -97.3300 251.000 30.0 194.144 6.940 -999.990 -999.990 1.941 ..P WKT 2010 12 23 18 34 55 31.3200 -97.3300 251.000 122.0 191.122 5.910 -999.990 -999.990 1.911 ..P WKT 2010 12 23 18 39 55 31.3200 -97.3300 251.000 457.0 198.987 5.940 -999.990 -999.990 1.990 ..P WKT 2010 12 23 18 49 55 31.3200 -97.3300 251.000 30.0 195.618 5.800 -999.990 -999.990 1.956 ..P WKT 2010 12 23 18 54 55 31.3200 -97.3300 251.000 122.0 190.756 6.010 -999.990 -999.990 1.908 ..P WKT 2010 12 23 18 59 55 31.3200 -97.3300 251.000 457.0 197.178 6.780 -999.990 -999.990 1.972 ..P WKT 2010 12 23 19 04 55 31.3200 -97.3300 251.000 30.0 196.963 6.170 -999.990 -999.990 1.970 ..P WKT 2010 12 23 19 09 55 31.3200 -97.3300 251.000 122.0 199.137 6.240 -999.990 -999.990 1.991 ..P WKT 2010 12 23 19 14 55 31.3200 -97.3300 251.000 457.0 200.116 5.040 -999.990 -999.990 2.001 ..P WKT 2010 12 23 19 24 55 31.3200 -97.3300 251.000 30.0 197.430 5.030 -999.990 -999.990 1.974 ..P WKT 2010 12 23 19 29 55 31.3200 -97.3300 251.000 122.0 196.552 5.900 -999.990 -999.990 1.966 ..P WKT 2010 12 23 19 34 55 31.3200 -97.3300 251.000 457.0 192.887 6.210 -999.990 -999.990 1.929 ..P WKT 2010 12 23 19 39 55 31.3200 -97.3300 251.000 30.0 195.591 5.970 -999.990 -999.990 1.956 ..P WKT 2010 12 23 19 44 55 31.3200 -97.3300 251.000 122.0 190.733 5.130 -999.990 -999.990 1.907 ..P WKT 2010 12 23 19 49 55 31.3200 -97.3300 251.000 457.0 192.773 5.140 -999.990 -999.990 1.928 ..P WKT 2010 12 23 19 59 55 31.3200 -97.3300 251.000 30.0 186.413 6.130 -999.990 -999.990 1.864 ..P WKT 2010 12 23 20 04 55 31.3200 -97.3300 251.000 122.0 182.522 5.810 -999.990 -999.990 1.825 ..P WKT 2010 12 23 20 09 55 31.3200 -97.3300 251.000 457.0 182.877 5.600 -999.990 -999.990 1.829 ..P WKT 2010 12 23 20 14 55 31.3200 -97.3300 251.000 30.0 183.895 6.170 -999.990 -999.990 1.839 ..P WKT 2010 12 23 20 19 55 31.3200 -97.3300 251.000 122.0 184.647 5.840 -999.990 -999.990 1.846 ..P WKT 2010 12 23 20 24 55 31.3200 -97.3300 251.000 457.0 182.746 6.700 -999.990 -999.990 1.827 ..P WKT 2010 12 23 20 34 55 31.3200 -97.3300 251.000 30.0 186.789 5.730 -999.990 -999.990 1.868 ..P WKT 2010 12 23 20 39 55 31.3200 -97.3300 251.000 122.0 180.399 5.600 -999.990 -999.990 1.804 ..P WKT 2010 12 23 20 44 55 31.3200 -97.3300 251.000 457.0 182.231 5.250 -999.990 -999.990 1.822 ..P WKT 2010 12 23 20 49 55 31.3200 -97.3300 251.000 30.0 188.570 5.650 -999.990 -999.990 1.886 ..P WKT 2010 12 23 20 54 55 31.3200 -97.3300 251.000 122.0 185.098 4.870 -999.990 -999.990 1.851 ..P WKT 2010 12 23 20 59 55 31.3200 -97.3300 251.000 457.0 188.255 5.080 -999.990 -999.990 1.883 ..P WKT 2010 12 23 21 09 55 31.3200 -97.3300 251.000 30.0 182.354 4.810 -999.990 -999.990 1.824 ..P WKT 2010 12 23 21 14 55 31.3200 -97.3300 251.000 122.0 190.263 5.040 -999.990 -999.990 1.903 ..P WKT 2010 12 23 21 19 55 31.3200 -97.3300 251.000 457.0 187.303 4.960 -999.990 -999.990 1.873 ..P WKT 2010 12 23 21 24 55 31.3200 -97.3300 251.000 30.0 185.669 5.340 -999.990 -999.990 1.857 ..P WKT 2010 12 23 21 29 55 31.3200 -97.3300 251.000 122.0 186.155 4.950 -999.990 -999.990 1.862 ..P WKT 2010 12 23 21 34 55 31.3200 -97.3300 251.000 457.0 182.136 5.130 -999.990 -999.990 1.821 ..P WKT 2010 12 23 21 44 55 31.3200 -97.3300 251.000 30.0 191.173 5.280 -999.990 -999.990 1.912 ..P WKT 2010 12 23 21 49 55 31.3200 -97.3300 251.000 122.0 192.832 5.610 -999.990 -999.990 1.928 ..P WKT 2010 12 23 21 54 55 31.3200 -97.3300 251.000 457.0 192.372 5.760 -999.990 -999.990 1.924 ..P WKT 2010 12 23 21 59 55 31.3200 -97.3300 251.000 30.0 195.356 6.470 -999.990 -999.990 1.954 ..P WKT 2010 12 23 22 04 55 31.3200 -97.3300 251.000 122.0 190.656 6.790 -999.990 -999.990 1.907 ..P WKT 2010 12 23 22 09 55 31.3200 -97.3300 251.000 457.0 190.726 4.940 -999.990 -999.990 1.907 ..P WKT 2010 12 23 22 19 55 31.3200 -97.3300 251.000 30.0 180.988 5.160 -999.990 -999.990 1.810 ..P WKT 2010 12 23 22 24 55 31.3200 -97.3300 251.000 122.0 180.982 4.730 -999.990 -999.990 1.810 ..P WKT 2010 12 23 22 29 55 31.3200 -97.3300 251.000 457.0 184.420 4.990 -999.990 -999.990 1.844 ..P WKT 2010 12 23 22 34 55 31.3200 -97.3300 251.000 30.0 188.652 4.900 -999.990 -999.990 1.887 ..P WKT 2010 12 23 22 39 55 31.3200 -97.3300 251.000 122.0 186.792 4.610 -999.990 -999.990 1.868 ..P WKT 2010 12 23 22 44 55 31.3200 -97.3300 251.000 457.0 182.152 5.690 -999.990 -999.990 1.822 ..P WKT 2010 12 23 22 54 55 31.3200 -97.3300 251.000 30.0 184.788 4.820 -999.990 -999.990 1.848 ..P WKT 2010 12 23 22 59 55 31.3200 -97.3300 251.000 122.0 183.459 4.710 -999.990 -999.990 1.835 ..P WKT 2010 12 23 23 04 55 31.3200 -97.3300 251.000 457.0 176.039 5.200 -999.990 -999.990 1.760 ..P WKT 2010 12 23 23 09 55 31.3200 -97.3300 251.000 30.0 179.608 5.640 -999.990 -999.990 1.796 ..P WKT 2010 12 23 23 14 55 31.3200 -97.3300 251.000 122.0 177.352 5.230 -999.990 -999.990 1.774 ..P WKT 2010 12 23 23 19 55 31.3200 -97.3300 251.000 457.0 173.774 5.310 -999.990 -999.990 1.738 ..P WKT 2010 12 23 23 29 55 31.3200 -97.3300 251.000 30.0 177.039 5.060 -999.990 -999.990 1.770 ..P WKT 2010 12 23 23 34 55 31.3200 -97.3300 251.000 122.0 184.676 5.050 -999.990 -999.990 1.847 ..P WKT 2010 12 23 23 39 55 31.3200 -97.3300 251.000 457.0 184.902 5.650 -999.990 -999.990 1.849 ..P WKT 2010 12 23 23 44 55 31.3200 -97.3300 251.000 30.0 187.245 5.450 -999.990 -999.990 1.872 ..P WKT 2010 12 23 23 49 55 31.3200 -97.3300 251.000 122.0 182.839 5.020 -999.990 -999.990 1.828 ..P WKT 2010 12 24 00 09 55 31.3200 -97.3300 251.000 457.0 180.345 5.060 -999.990 -999.990 1.803 ..P WKT 2010 12 24 00 10 25 31.3200 -97.3300 251.000 457.0 182.713 4.970 -999.990 -999.990 1.827 ..P WKT 2010 12 24 00 10 55 31.3200 -97.3300 251.000 457.0 178.331 4.620 -999.990 -999.990 1.783 ..P WKT 2010 12 24 00 11 25 31.3200 -97.3300 251.000 457.0 178.316 4.590 -999.990 -999.990 1.783 ..P WKT 2010 12 24 00 11 55 31.3200 -97.3300 251.000 457.0 185.581 6.420 -999.990 -999.990 1.856 ..P WKT 2010 12 24 00 12 25 31.3200 -97.3300 251.000 457.0 183.581 6.000 -999.990 -999.990 1.836 ..P WKT 2010 12 24 00 12 55 31.3200 -97.3300 251.000 457.0 184.095 5.280 -999.990 -999.990 1.841 ..P WKT 2010 12 24 00 13 25 31.3200 -97.3300 251.000 457.0 186.993 4.810 -999.990 -999.990 1.870 ..P WKT 2010 12 24 00 13 55 31.3200 -97.3300 251.000 457.0 182.611 5.010 -999.990 -999.990 1.826 ..P WKT 2010 12 24 00 14 25 31.3200 -97.3300 251.000 457.0 182.199 4.860 -999.990 -999.990 1.822 ..P WKT 2010 12 24 00 14 55 31.3200 -97.3300 251.000 457.0 181.257 5.070 -999.990 -999.990 1.813 ..P WKT 2010 12 24 00 19 55 31.3200 -97.3300 251.000 30.0 179.920 5.560 -999.990 -999.990 1.799 ..P WKT 2010 12 24 00 24 55 31.3200 -97.3300 251.000 122.0 185.864 5.560 -999.990 -999.990 1.859 ..P WKT 2010 12 24 00 29 55 31.3200 -97.3300 251.000 457.0 181.746 4.980 -999.990 -999.990 1.817 ..P WKT 2010 12 24 00 34 55 31.3200 -97.3300 251.000 30.0 177.627 4.730 -999.990 -999.990 1.776 ..P WKT 2010 12 24 00 39 55 31.3200 -97.3300 251.000 122.0 175.891 5.150 -999.990 -999.990 1.759 ..P WKT 2010 12 24 00 44 55 31.3200 -97.3300 251.000 457.0 181.970 5.280 -999.990 -999.990 1.820 ..P WKT 2010 12 24 00 54 55 31.3200 -97.3300 251.000 30.0 189.373 5.060 -999.990 -999.990 1.894 ..P WKT 2010 12 24 00 59 55 31.3200 -97.3300 251.000 122.0 184.733 4.870 -999.990 -999.990 1.847 ..P WKT 2010 12 24 01 04 55 31.3200 -97.3300 251.000 457.0 204.744 5.060 -999.990 -999.990 2.047 ..P WKT 2010 12 24 01 09 55 31.3200 -97.3300 251.000 30.0 186.849 4.780 -999.990 -999.990 1.868 ..P WKT 2010 12 24 01 14 55 31.3200 -97.3300 251.000 122.0 177.699 4.610 -999.990 -999.990 1.777 ..P WKT 2010 12 24 01 19 55 31.3200 -97.3300 251.000 457.0 200.898 5.070 -999.990 -999.990 2.009 ..P WKT 2010 12 24 01 29 55 31.3200 -97.3300 251.000 30.0 187.787 5.800 -999.990 -999.990 1.878 ..P WKT 2010 12 24 01 34 55 31.3200 -97.3300 251.000 122.0 177.722 4.770 -999.990 -999.990 1.777 ..P WKT 2010 12 24 01 39 55 31.3200 -97.3300 251.000 457.0 203.209 5.550 -999.990 -999.990 2.032 ..P WKT 2010 12 24 01 44 55 31.3200 -97.3300 251.000 30.0 182.794 4.950 -999.990 -999.990 1.828 ..P WKT 2010 12 24 01 49 55 31.3200 -97.3300 251.000 122.0 175.910 5.040 -999.990 -999.990 1.759 ..P WKT 2010 12 24 01 54 55 31.3200 -97.3300 251.000 457.0 183.092 6.030 -999.990 -999.990 1.831 ..P WKT 2010 12 24 02 04 55 31.3200 -97.3300 251.000 30.0 171.897 5.320 -999.990 -999.990 1.719 ..P WKT 2010 12 24 02 09 55 31.3200 -97.3300 251.000 122.0 170.508 5.480 -999.990 -999.990 1.705 ..P WKT 2010 12 24 02 14 55 31.3200 -97.3300 251.000 457.0 227.544 5.970 -999.990 -999.990 2.275 ..P WKT 2010 12 24 02 19 55 31.3200 -97.3300 251.000 30.0 175.166 5.620 -999.990 -999.990 1.752 ..P WKT 2010 12 24 02 24 55 31.3200 -97.3300 251.000 122.0 168.995 5.460 -999.990 -999.990 1.690 ..P WKT 2010 12 24 02 29 55 31.3200 -97.3300 251.000 457.0 227.647 5.580 -999.990 -999.990 2.276 ..P WKT 2010 12 24 02 39 55 31.3200 -97.3300 251.000 30.0 182.666 6.340 -999.990 -999.990 1.827 ..P WKT 2010 12 24 02 44 55 31.3200 -97.3300 251.000 122.0 165.502 5.420 -999.990 -999.990 1.655 ..P WKT 2010 12 24 02 49 55 31.3200 -97.3300 251.000 457.0 233.393 5.530 -999.990 -999.990 2.334 ..P WKT 2010 12 24 02 54 55 31.3200 -97.3300 251.000 30.0 174.226 5.600 -999.990 -999.990 1.742 ..P WKT 2010 12 24 02 59 55 31.3200 -97.3300 251.000 122.0 163.168 5.130 -999.990 -999.990 1.632 ..P WKT 2010 12 24 03 04 55 31.3200 -97.3300 251.000 457.0 163.808 4.970 -999.990 -999.990 1.638 ..P WKT 2010 12 24 03 14 55 31.3200 -97.3300 251.000 30.0 174.589 4.970 -999.990 -999.990 1.746 ..P WKT 2010 12 24 03 19 55 31.3200 -97.3300 251.000 122.0 166.909 5.340 -999.990 -999.990 1.669 ..P WKT 2010 12 24 03 24 55 31.3200 -97.3300 251.000 457.0 179.181 5.860 -999.990 -999.990 1.792 ..P WKT 2010 12 24 03 29 55 31.3200 -97.3300 251.000 30.0 166.442 5.920 -999.990 -999.990 1.664 ..P WKT 2010 12 24 03 34 55 31.3200 -97.3300 251.000 122.0 169.137 5.750 -999.990 -999.990 1.691 ..P WKT 2010 12 24 03 39 55 31.3200 -97.3300 251.000 457.0 160.919 5.330 -999.990 -999.990 1.609 ..P WKT 2010 12 24 03 49 55 31.3200 -97.3300 251.000 30.0 172.450 5.310 -999.990 -999.990 1.724 ..P WKT 2010 12 24 03 54 55 31.3200 -97.3300 251.000 122.0 172.236 5.610 -999.990 -999.990 1.722 ..P WKT 2010 12 24 03 59 55 31.3200 -97.3300 251.000 457.0 141.131 6.100 -999.990 -999.990 1.411 ..P WKT 2010 12 24 04 04 55 31.3200 -97.3300 251.000 30.0 168.213 6.020 -999.990 -999.990 1.682 ..P WKT 2010 12 24 04 09 55 31.3200 -97.3300 251.000 122.0 178.122 5.720 -999.990 -999.990 1.781 ..P WKT 2010 12 24 04 14 55 31.3200 -97.3300 251.000 457.0 130.620 5.560 -999.990 -999.990 1.306 ..P WKT 2010 12 24 04 24 55 31.3200 -97.3300 251.000 30.0 169.754 5.900 -999.990 -999.990 1.698 ..P WKT 2010 12 24 04 29 55 31.3200 -97.3300 251.000 122.0 179.402 6.660 -999.990 -999.990 1.794 ..P WKT 2010 12 24 04 34 55 31.3200 -97.3300 251.000 457.0 136.806 5.990 -999.990 -999.990 1.368 ..P WKT 2010 12 24 04 39 55 31.3200 -97.3300 251.000 30.0 170.045 5.650 -999.990 -999.990 1.700 ..P WKT 2010 12 24 04 44 55 31.3200 -97.3300 251.000 122.0 177.963 5.280 -999.990 -999.990 1.780 ..P WKT 2010 12 24 04 49 55 31.3200 -97.3300 251.000 457.0 151.217 5.210 -999.990 -999.990 1.512 ..P WKT 2010 12 24 05 04 55 31.3200 -97.3300 251.000 30.0 170.431 5.120 -999.990 -999.990 1.704 ..P WKT 2010 12 24 05 09 55 31.3200 -97.3300 251.000 122.0 171.412 5.470 -999.990 -999.990 1.714 ..P WKT 2010 12 24 05 14 55 31.3200 -97.3300 251.000 457.0 149.713 5.330 -999.990 -999.990 1.497 ..P WKT 2010 12 24 05 19 55 31.3200 -97.3300 251.000 30.0 174.443 5.160 -999.990 -999.990 1.744 ..P WKT 2010 12 24 05 24 55 31.3200 -97.3300 251.000 122.0 172.757 5.260 -999.990 -999.990 1.728 ..P WKT 2010 12 24 05 29 55 31.3200 -97.3300 251.000 457.0 162.261 8.150 -999.990 -999.990 1.623 ..P WKT 2010 12 24 05 39 55 31.3200 -97.3300 251.000 30.0 179.085 5.220 -999.990 -999.990 1.791 ..P WKT 2010 12 24 05 44 55 31.3200 -97.3300 251.000 122.0 179.444 5.440 -999.990 -999.990 1.794 ..P WKT 2010 12 24 05 49 55 31.3200 -97.3300 251.000 457.0 229.482 5.980 -999.990 -999.990 2.295 ..P WKT 2010 12 24 05 54 55 31.3200 -97.3300 251.000 30.0 174.553 5.680 -999.990 -999.990 1.746 ..P WKT 2010 12 24 05 59 55 31.3200 -97.3300 251.000 122.0 178.651 6.060 -999.990 -999.990 1.787 ..P WKT 2010 12 24 06 04 55 31.3200 -97.3300 251.000 457.0 201.722 5.740 -999.990 -999.990 2.017 ..P WKT 2010 12 24 06 14 55 31.3200 -97.3300 251.000 30.0 179.538 5.210 -999.990 -999.990 1.795 ..P WKT 2010 12 24 06 19 55 31.3200 -97.3300 251.000 122.0 177.301 5.590 -999.990 -999.990 1.773 ..P WKT 2010 12 24 06 24 55 31.3200 -97.3300 251.000 457.0 215.163 5.850 -999.990 -999.990 2.152 ..P WKT 2010 12 24 06 29 55 31.3200 -97.3300 251.000 30.0 173.091 6.350 -999.990 -999.990 1.731 ..P WKT 2010 12 24 06 34 55 31.3200 -97.3300 251.000 122.0 167.108 6.410 -999.990 -999.990 1.671 ..P WKT 2010 12 24 06 39 55 31.3200 -97.3300 251.000 457.0 183.188 5.480 -999.990 -999.990 1.832 ..P WKT 2010 12 24 06 49 55 31.3200 -97.3300 251.000 30.0 172.061 5.450 -999.990 -999.990 1.721 ..P WKT 2010 12 24 06 54 55 31.3200 -97.3300 251.000 122.0 170.662 6.940 -999.990 -999.990 1.707 ..P WKT 2010 12 24 06 59 55 31.3200 -97.3300 251.000 457.0 150.264 6.840 -999.990 -999.990 1.503 ..P WKT 2010 12 24 07 04 55 31.3200 -97.3300 251.000 30.0 169.200 6.320 -999.990 -999.990 1.692 ..P WKT 2010 12 24 07 09 55 31.3200 -97.3300 251.000 122.0 174.892 5.370 -999.990 -999.990 1.749 ..P WKT 2010 12 24 07 14 55 31.3200 -97.3300 251.000 457.0 166.934 5.900 -999.990 -999.990 1.669 ..P WKT 2010 12 24 07 24 55 31.3200 -97.3300 251.000 30.0 167.842 5.580 -999.990 -999.990 1.678 ..P WKT 2010 12 24 07 29 55 31.3200 -97.3300 251.000 122.0 173.499 5.730 -999.990 -999.990 1.735 ..P WKT 2010 12 24 07 34 55 31.3200 -97.3300 251.000 457.0 147.821 5.490 -999.990 -999.990 1.478 ..P WKT 2010 12 24 07 39 55 31.3200 -97.3300 251.000 30.0 164.191 5.540 -999.990 -999.990 1.642 ..P WKT 2010 12 24 07 44 55 31.3200 -97.3300 251.000 122.0 168.913 5.810 -999.990 -999.990 1.689 ..P WKT 2010 12 24 07 49 55 31.3200 -97.3300 251.000 457.0 151.664 5.920 -999.990 -999.990 1.517 ..P WKT 2010 12 24 07 59 55 31.3200 -97.3300 251.000 30.0 170.487 6.230 -999.990 -999.990 1.705 ..P WKT 2010 12 24 08 04 55 31.3200 -97.3300 251.000 122.0 173.737 5.640 -999.990 -999.990 1.737 ..P WKT 2010 12 24 08 09 55 31.3200 -97.3300 251.000 457.0 137.714 7.050 -999.990 -999.990 1.377 ..P WKT 2010 12 24 08 14 55 31.3200 -97.3300 251.000 30.0 166.833 5.710 -999.990 -999.990 1.668 ..P WKT 2010 12 24 08 19 55 31.3200 -97.3300 251.000 122.0 170.084 5.700 -999.990 -999.990 1.701 ..P WKT 2010 12 24 08 24 55 31.3200 -97.3300 251.000 457.0 133.242 5.670 -999.990 -999.990 1.332 ..P WKT 2010 12 24 08 34 55 31.3200 -97.3300 251.000 30.0 169.668 5.520 -999.990 -999.990 1.697 ..P WKT 2010 12 24 08 39 55 31.3200 -97.3300 251.000 122.0 176.160 5.550 -999.990 -999.990 1.762 ..P WKT 2010 12 24 08 44 55 31.3200 -97.3300 251.000 457.0 134.890 5.410 -999.990 -999.990 1.349 ..P WKT 2010 12 24 08 49 55 31.3200 -97.3300 251.000 30.0 179.219 5.970 -999.990 -999.990 1.792 ..P WKT 2010 12 24 08 54 55 31.3200 -97.3300 251.000 122.0 170.952 5.400 -999.990 -999.990 1.710 ..P WKT 2010 12 24 08 59 55 31.3200 -97.3300 251.000 457.0 143.087 5.690 -999.990 -999.990 1.431 ..P WKT 2010 12 24 09 09 55 31.3200 -97.3300 251.000 30.0 168.426 5.380 -999.990 -999.990 1.684 ..P WKT 2010 12 24 09 14 55 31.3200 -97.3300 251.000 122.0 173.849 5.960 -999.990 -999.990 1.738 ..P WKT 2010 12 24 09 19 55 31.3200 -97.3300 251.000 457.0 144.896 5.450 -999.990 -999.990 1.449 ..P WKT 2010 12 24 09 24 55 31.3200 -97.3300 251.000 30.0 174.762 5.620 -999.990 -999.990 1.748 ..P WKT 2010 12 24 09 29 55 31.3200 -97.3300 251.000 122.0 177.771 5.520 -999.990 -999.990 1.778 ..P WKT 2010 12 24 09 34 55 31.3200 -97.3300 251.000 457.0 137.252 5.510 -999.990 -999.990 1.373 ..P WKT 2010 12 24 09 44 55 31.3200 -97.3300 251.000 30.0 177.894 5.740 -999.990 -999.990 1.779 ..P WKT 2010 12 24 09 49 55 31.3200 -97.3300 251.000 122.0 186.511 6.000 -999.990 -999.990 1.865 ..P WKT 2010 12 24 09 54 55 31.3200 -97.3300 251.000 457.0 142.170 5.860 -999.990 -999.990 1.422 ..P WKT 2010 12 24 09 59 55 31.3200 -97.3300 251.000 30.0 185.469 5.690 -999.990 -999.990 1.855 ..P WKT 2010 12 24 10 04 55 31.3200 -97.3300 251.000 122.0 193.283 6.870 -999.990 -999.990 1.933 ..P WKT 2010 12 24 10 09 55 31.3200 -97.3300 251.000 457.0 140.051 5.550 -999.990 -999.990 1.401 ..P WKT 2010 12 24 10 19 55 31.3200 -97.3300 251.000 30.0 192.645 5.710 -999.990 -999.990 1.926 ..P WKT 2010 12 24 10 24 55 31.3200 -97.3300 251.000 122.0 184.974 6.010 -999.990 -999.990 1.850 ..P WKT 2010 12 24 10 29 55 31.3200 -97.3300 251.000 457.0 133.846 5.770 -999.990 -999.990 1.338 ..P WKT 2010 12 24 10 34 55 31.3200 -97.3300 251.000 30.0 180.259 6.030 -999.990 -999.990 1.803 ..P WKT 2010 12 24 10 39 55 31.3200 -97.3300 251.000 122.0 176.219 6.840 -999.990 -999.990 1.762 ..P WKT 2010 12 24 10 44 55 31.3200 -97.3300 251.000 457.0 141.085 5.510 -999.990 -999.990 1.411 ..P WKT 2010 12 24 10 54 55 31.3200 -97.3300 251.000 30.0 175.938 6.470 -999.990 -999.990 1.759 ..P WKT 2010 12 24 10 59 55 31.3200 -97.3300 251.000 122.0 176.876 6.000 -999.990 -999.990 1.769 ..P WKT 2010 12 24 11 04 55 31.3200 -97.3300 251.000 457.0 140.781 6.290 -999.990 -999.990 1.408 ..P WKT 2010 12 24 11 09 55 31.3200 -97.3300 251.000 30.0 172.289 5.830 -999.990 -999.990 1.723 ..P WKT 2010 12 24 11 14 55 31.3200 -97.3300 251.000 122.0 178.212 5.660 -999.990 -999.990 1.782 ..P WKT 2010 12 24 11 19 55 31.3200 -97.3300 251.000 457.0 138.599 5.990 -999.990 -999.990 1.386 ..P WKT 2010 12 24 11 29 55 31.3200 -97.3300 251.000 30.0 172.998 5.730 -999.990 -999.990 1.730 ..P WKT 2010 12 24 11 34 55 31.3200 -97.3300 251.000 122.0 181.133 6.550 -999.990 -999.990 1.811 ..P WKT 2010 12 24 11 39 55 31.3200 -97.3300 251.000 457.0 144.519 7.160 -999.990 -999.990 1.445 ..P WKT 2010 12 24 11 44 55 31.3200 -97.3300 251.000 30.0 179.749 5.890 -999.990 -999.990 1.797 ..P WKT 2010 12 24 11 49 55 31.3200 -97.3300 251.000 122.0 181.821 6.230 -999.990 -999.990 1.818 ..P WKT 2010 12 24 12 09 55 31.3200 -97.3300 251.000 457.0 146.088 6.250 -999.990 -999.990 1.461 ..P WKT 2010 12 24 12 10 25 31.3200 -97.3300 251.000 457.0 150.145 6.530 -999.990 -999.990 1.501 ..P WKT 2010 12 24 12 10 55 31.3200 -97.3300 251.000 457.0 146.246 7.860 -999.990 -999.990 1.462 ..P WKT 2010 12 24 12 11 25 31.3200 -97.3300 251.000 457.0 143.022 6.780 -999.990 -999.990 1.430 ..P WKT 2010 12 24 12 11 55 31.3200 -97.3300 251.000 457.0 150.179 5.690 -999.990 -999.990 1.502 ..P WKT 2010 12 24 12 12 25 31.3200 -97.3300 251.000 457.0 149.247 5.720 -999.990 -999.990 1.492 ..P WKT 2010 12 24 12 12 55 31.3200 -97.3300 251.000 457.0 150.607 5.780 -999.990 -999.990 1.506 ..P WKT 2010 12 24 12 13 25 31.3200 -97.3300 251.000 457.0 145.360 5.970 -999.990 -999.990 1.454 ..P WKT 2010 12 24 12 13 55 31.3200 -97.3300 251.000 457.0 148.338 5.960 -999.990 -999.990 1.483 ..P WKT 2010 12 24 12 14 25 31.3200 -97.3300 251.000 457.0 153.068 6.640 -999.990 -999.990 1.531 ..P WKT 2010 12 24 12 14 55 31.3200 -97.3300 251.000 457.0 153.753 6.050 -999.990 -999.990 1.538 ..P WKT 2010 12 24 12 19 55 31.3200 -97.3300 251.000 30.0 175.979 6.120 -999.990 -999.990 1.760 ..P WKT 2010 12 24 12 24 55 31.3200 -97.3300 251.000 122.0 174.070 5.750 -999.990 -999.990 1.741 ..P WKT 2010 12 24 12 29 55 31.3200 -97.3300 251.000 457.0 175.800 6.380 -999.990 -999.990 1.758 ..P WKT 2010 12 24 12 34 55 31.3200 -97.3300 251.000 30.0 176.451 6.130 -999.990 -999.990 1.765 ..P WKT 2010 12 24 12 39 55 31.3200 -97.3300 251.000 122.0 176.834 6.280 -999.990 -999.990 1.768 ..P WKT 2010 12 24 12 44 55 31.3200 -97.3300 251.000 457.0 176.138 5.710 -999.990 -999.990 1.761 ..P WKT 2010 12 24 12 54 55 31.3200 -97.3300 251.000 30.0 185.113 5.660 -999.990 -999.990 1.851 ..P WKT 2010 12 24 12 59 55 31.3200 -97.3300 251.000 122.0 184.273 5.630 -999.990 -999.990 1.843 ..P WKT 2010 12 24 13 04 55 31.3200 -97.3300 251.000 457.0 173.733 6.010 -999.990 -999.990 1.737 ..P WKT 2010 12 24 13 09 55 31.3200 -97.3300 251.000 30.0 180.438 5.950 -999.990 -999.990 1.804 ..P WKT 2010 12 24 13 14 55 31.3200 -97.3300 251.000 122.0 181.485 6.220 -999.990 -999.990 1.815 ..P WKT 2010 12 24 13 19 55 31.3200 -97.3300 251.000 457.0 173.372 7.000 -999.990 -999.990 1.734 ..P WKT 2010 12 24 13 29 55 31.3200 -97.3300 251.000 30.0 187.125 5.710 -999.990 -999.990 1.871 ..P WKT 2010 12 24 13 34 55 31.3200 -97.3300 251.000 122.0 190.403 5.810 -999.990 -999.990 1.904 ..P WKT 2010 12 24 13 39 55 31.3200 -97.3300 251.000 457.0 158.129 5.680 -999.990 -999.990 1.581 ..P WKT 2010 12 24 13 44 55 31.3200 -97.3300 251.000 30.0 189.417 6.300 -999.990 -999.990 1.894 ..P WKT 2010 12 24 13 49 55 31.3200 -97.3300 251.000 122.0 193.501 5.750 -999.990 -999.990 1.935 ..P WKT 2010 12 24 13 54 55 31.3200 -97.3300 251.000 457.0 155.041 5.750 -999.990 -999.990 1.550 ..P WKT 2010 12 24 14 04 55 31.3200 -97.3300 251.000 30.0 180.886 5.690 -999.990 -999.990 1.809 ..P WKT 2010 12 24 14 09 55 31.3200 -97.3300 251.000 122.0 184.066 6.080 -999.990 -999.990 1.841 ..P WKT 2010 12 24 14 14 55 31.3200 -97.3300 251.000 457.0 148.483 6.140 -999.990 -999.990 1.485 ..P WKT 2010 12 24 14 19 55 31.3200 -97.3300 251.000 30.0 186.118 6.330 -999.990 -999.990 1.861 ..P WKT 2010 12 24 14 24 55 31.3200 -97.3300 251.000 122.0 181.762 7.050 -999.990 -999.990 1.818 ..P WKT 2010 12 24 14 29 55 31.3200 -97.3300 251.000 457.0 181.038 5.700 -999.990 -999.990 1.810 ..P WKT 2010 12 24 14 39 55 31.3200 -97.3300 251.000 30.0 182.860 5.630 -999.990 -999.990 1.829 ..P WKT 2010 12 24 14 44 55 31.3200 -97.3300 251.000 122.0 182.579 5.980 -999.990 -999.990 1.826 ..P WKT 2010 12 24 14 49 55 31.3200 -97.3300 251.000 457.0 140.999 6.900 -999.990 -999.990 1.410 ..P WKT 2010 12 24 14 54 55 31.3200 -97.3300 251.000 30.0 187.263 5.760 -999.990 -999.990 1.873 ..P WKT 2010 12 24 14 59 55 31.3200 -97.3300 251.000 122.0 192.766 6.260 -999.990 -999.990 1.928 ..P WKT 2010 12 24 15 04 55 31.3200 -97.3300 251.000 457.0 133.979 6.450 -999.990 -999.990 1.340 ..P WKT 2010 12 24 15 14 55 31.3200 -97.3300 251.000 30.0 189.116 6.500 -999.990 -999.990 1.891 ..P WKT 2010 12 24 15 19 55 31.3200 -97.3300 251.000 122.0 194.097 5.930 -999.990 -999.990 1.941 ..P WKT 2010 12 24 15 24 55 31.3200 -97.3300 251.000 457.0 136.692 5.310 -999.990 -999.990 1.367 ..P WKT 2010 12 24 15 29 55 31.3200 -97.3300 251.000 30.0 197.874 6.370 -999.990 -999.990 1.979 ..P WKT 2010 12 24 15 34 55 31.3200 -97.3300 251.000 122.0 196.402 5.260 -999.990 -999.990 1.964 ..P WKT 2010 12 24 15 39 55 31.3200 -97.3300 251.000 457.0 136.590 5.090 -999.990 -999.990 1.366 ..P WKT 2010 12 24 15 49 55 31.3200 -97.3300 251.000 30.0 196.190 5.350 -999.990 -999.990 1.962 ..P WKT 2010 12 24 15 54 55 31.3200 -97.3300 251.000 122.0 200.804 5.020 -999.990 -999.990 2.008 ..P WKT 2010 12 24 15 59 55 31.3200 -97.3300 251.000 457.0 134.731 5.130 -999.990 -999.990 1.347 ..P WKT 2010 12 24 16 04 55 31.3200 -97.3300 251.000 30.0 195.248 5.100 -999.990 -999.990 1.952 ..P WKT 2010 12 24 16 09 55 31.3200 -97.3300 251.000 122.0 198.518 5.150 -999.990 -999.990 1.985 ..P WKT 2010 12 24 16 14 55 31.3200 -97.3300 251.000 457.0 154.360 5.570 -999.990 -999.990 1.544 ..P WKT 2010 12 24 16 24 55 31.3200 -97.3300 251.000 30.0 200.647 5.700 -999.990 -999.990 2.006 ..P WKT 2010 12 24 16 29 55 31.3200 -97.3300 251.000 122.0 197.314 5.390 -999.990 -999.990 1.973 ..P WKT 2010 12 24 16 34 55 31.3200 -97.3300 251.000 457.0 128.706 4.830 -999.990 -999.990 1.287 ..P WKT 2010 12 24 16 39 55 31.3200 -97.3300 251.000 30.0 194.410 5.170 -999.990 -999.990 1.944 ..P WKT 2010 12 24 16 44 55 31.3200 -97.3300 251.000 122.0 194.570 4.890 -999.990 -999.990 1.946 ..P WKT 2010 12 24 16 49 55 31.3200 -97.3300 251.000 457.0 127.857 6.980 -999.990 -999.990 1.279 ..P WKT 2010 12 24 17 04 55 31.3200 -97.3300 251.000 30.0 205.441 5.030 -999.990 -999.990 2.054 ..P WKT 2010 12 24 17 09 55 31.3200 -97.3300 251.000 122.0 195.278 5.360 -999.990 -999.990 1.953 ..P WKT 2010 12 24 17 14 55 31.3200 -97.3300 251.000 457.0 120.148 4.850 -999.990 -999.990 1.201 ..P WKT 2010 12 24 17 19 55 31.3200 -97.3300 251.000 30.0 200.457 5.540 -999.990 -999.990 2.005 ..P WKT 2010 12 24 17 24 55 31.3200 -97.3300 251.000 122.0 199.961 5.470 -999.990 -999.990 2.000 ..P WKT 2010 12 24 17 29 55 31.3200 -97.3300 251.000 457.0 120.285 5.320 -999.990 -999.990 1.203 ..P WKT 2010 12 24 17 39 55 31.3200 -97.3300 251.000 30.0 206.563 6.140 -999.990 -999.990 2.066 ..P WKT 2010 12 24 17 44 55 31.3200 -97.3300 251.000 122.0 208.255 5.330 -999.990 -999.990 2.083 ..P WKT 2010 12 24 17 49 55 31.3200 -97.3300 251.000 457.0 194.115 5.300 -999.990 -999.990 1.941 ..P WKT 2010 12 24 17 54 55 31.3200 -97.3300 251.000 30.0 205.735 5.070 -999.990 -999.990 2.057 ..P WKT 2010 12 24 17 59 55 31.3200 -97.3300 251.000 122.0 193.476 4.480 -999.990 -999.990 1.935 ..P WKT 2010 12 24 18 04 55 31.3200 -97.3300 251.000 457.0 188.999 4.960 -999.990 -999.990 1.890 ..P WKT 2010 12 24 18 14 55 31.3200 -97.3300 251.000 30.0 202.979 4.250 -999.990 -999.990 2.030 ..P WKT 2010 12 24 18 19 55 31.3200 -97.3300 251.000 122.0 210.168 4.830 -999.990 -999.990 2.102 ..P WKT 2010 12 24 18 24 55 31.3200 -97.3300 251.000 457.0 193.757 6.360 -999.990 -999.990 1.938 ..P WKT 2010 12 24 18 29 55 31.3200 -97.3300 251.000 30.0 206.711 6.030 -999.990 -999.990 2.067 ..P WKT 2010 12 24 18 34 55 31.3200 -97.3300 251.000 122.0 200.358 5.340 -999.990 -999.990 2.004 ..P WKT 2010 12 24 18 39 55 31.3200 -97.3300 251.000 457.0 202.049 5.650 -999.990 -999.990 2.020 ..P WKT 2010 12 24 18 49 55 31.3200 -97.3300 251.000 30.0 200.203 4.650 -999.990 -999.990 2.002 ..P WKT 2010 12 24 18 54 55 31.3200 -97.3300 251.000 122.0 204.038 7.480 -999.990 -999.990 2.040 ..P WKT 2010 12 24 18 59 55 31.3200 -97.3300 251.000 457.0 200.368 5.900 -999.990 -999.990 2.004 ..P WKT 2010 12 24 19 04 55 31.3200 -97.3300 251.000 30.0 196.162 6.060 -999.990 -999.990 1.962 ..P WKT 2010 12 24 19 09 55 31.3200 -97.3300 251.000 122.0 203.481 6.180 -999.990 -999.990 2.035 ..P WKT 2010 12 24 19 14 55 31.3200 -97.3300 251.000 457.0 194.854 5.650 -999.990 -999.990 1.949 ..P WKT 2010 12 24 19 24 55 31.3200 -97.3300 251.000 30.0 215.210 5.510 -999.990 -999.990 2.152 ..P WKT 2010 12 24 19 29 55 31.3200 -97.3300 251.000 122.0 204.938 5.750 -999.990 -999.990 2.049 ..P WKT 2010 12 24 19 34 55 31.3200 -97.3300 251.000 457.0 198.017 5.680 -999.990 -999.990 1.980 ..P WKT 2010 12 24 19 39 55 31.3200 -97.3300 251.000 30.0 207.972 5.520 -999.990 -999.990 2.080 ..P WKT 2010 12 24 19 44 55 31.3200 -97.3300 251.000 122.0 209.221 4.370 -999.990 -999.990 2.092 ..P WKT 2010 12 24 19 49 55 31.3200 -97.3300 251.000 457.0 192.257 4.270 -999.990 -999.990 1.923 ..P WKT 2010 12 24 19 59 55 31.3200 -97.3300 251.000 30.0 210.364 4.770 -999.990 -999.990 2.104 ..P WKT 2010 12 24 20 04 55 31.3200 -97.3300 251.000 122.0 211.555 4.760 -999.990 -999.990 2.116 ..P WKT 2010 12 24 20 09 55 31.3200 -97.3300 251.000 457.0 184.766 4.560 -999.990 -999.990 1.848 ..P WKT 2010 12 24 20 14 55 31.3200 -97.3300 251.000 30.0 215.275 5.150 -999.990 -999.990 2.153 ..P WKT 2010 12 24 20 19 55 31.3200 -97.3300 251.000 122.0 210.710 5.070 -999.990 -999.990 2.107 ..P WKT 2010 12 24 20 24 55 31.3200 -97.3300 251.000 457.0 169.606 5.130 -999.990 -999.990 1.696 ..P WKT 2010 12 24 20 34 55 31.3200 -97.3300 251.000 30.0 223.992 4.960 -999.990 -999.990 2.240 ..P WKT 2010 12 24 20 39 55 31.3200 -97.3300 251.000 122.0 213.214 5.110 -999.990 -999.990 2.132 ..P WKT 2010 12 24 20 44 55 31.3200 -97.3300 251.000 457.0 139.553 4.290 -999.990 -999.990 1.396 ..P WKT 2010 12 24 20 49 55 31.3200 -97.3300 251.000 30.0 222.704 5.010 -999.990 -999.990 2.227 ..P WKT 2010 12 24 20 54 55 31.3200 -97.3300 251.000 122.0 226.913 4.420 -999.990 -999.990 2.269 ..P WKT 2010 12 24 20 59 55 31.3200 -97.3300 251.000 457.0 140.158 4.020 -999.990 -999.990 1.402 ..P WKT 2010 12 24 21 09 55 31.3200 -97.3300 251.000 30.0 226.885 5.540 -999.990 -999.990 2.269 ..P WKT 2010 12 24 21 14 55 31.3200 -97.3300 251.000 122.0 222.724 4.400 -999.990 -999.990 2.227 ..P WKT 2010 12 24 21 19 55 31.3200 -97.3300 251.000 457.0 155.979 4.400 -999.990 -999.990 1.560 ..P WKT 2010 12 24 21 24 55 31.3200 -97.3300 251.000 30.0 232.054 4.500 -999.990 -999.990 2.321 ..P WKT 2010 12 24 21 29 55 31.3200 -97.3300 251.000 122.0 242.601 4.220 -999.990 -999.990 2.426 ..P WKT 2010 12 24 21 34 55 31.3200 -97.3300 251.000 457.0 172.126 3.720 -999.990 -999.990 1.721 ..P WKT 2010 12 24 21 44 55 31.3200 -97.3300 251.000 30.0 237.681 4.810 -999.990 -999.990 2.377 ..P WKT 2010 12 24 21 49 55 31.3200 -97.3300 251.000 122.0 231.192 4.620 -999.990 -999.990 2.312 ..P WKT 2010 12 24 21 54 55 31.3200 -97.3300 251.000 457.0 179.261 4.560 -999.990 -999.990 1.793 ..P WKT 2010 12 24 21 59 55 31.3200 -97.3300 251.000 30.0 223.829 4.690 -999.990 -999.990 2.238 ..P WKT 2010 12 24 22 04 55 31.3200 -97.3300 251.000 122.0 218.411 4.680 -999.990 -999.990 2.184 ..P WKT 2010 12 24 22 09 55 31.3200 -97.3300 251.000 457.0 175.446 4.130 -999.990 -999.990 1.754 ..P WKT 2010 12 24 22 19 55 31.3200 -97.3300 251.000 30.0 218.978 3.740 -999.990 -999.990 2.190 ..P WKT 2010 12 24 22 24 55 31.3200 -97.3300 251.000 122.0 214.611 4.120 -999.990 -999.990 2.146 ..P WKT 2010 12 24 22 29 55 31.3200 -97.3300 251.000 457.0 186.736 3.530 -999.990 -999.990 1.867 ..P WKT 2010 12 24 22 34 55 31.3200 -97.3300 251.000 30.0 221.910 4.450 -999.990 -999.990 2.219 ..P WKT 2010 12 24 22 39 55 31.3200 -97.3300 251.000 122.0 224.890 3.490 -999.990 -999.990 2.249 ..P WKT 2010 12 24 22 44 55 31.3200 -97.3300 251.000 457.0 206.503 4.250 -999.990 -999.990 2.065 ..P WKT 2010 12 24 22 54 55 31.3200 -97.3300 251.000 30.0 227.725 3.460 -999.990 -999.990 2.277 ..P WKT 2010 12 24 22 59 55 31.3200 -97.3300 251.000 122.0 232.745 3.920 -999.990 -999.990 2.327 ..P WKT 2010 12 24 23 04 55 31.3200 -97.3300 251.000 457.0 223.345 3.460 -999.990 -999.990 2.233 ..P WKT 2010 12 24 23 09 55 31.3200 -97.3300 251.000 30.0 230.233 4.190 -999.990 -999.990 2.302 ..P WKT 2010 12 24 23 14 55 31.3200 -97.3300 251.000 122.0 228.844 4.510 -999.990 -999.990 2.288 ..P WKT 2010 12 24 23 19 55 31.3200 -97.3300 251.000 457.0 235.464 3.860 -999.990 -999.990 2.355 ..P WKT 2010 12 24 23 29 55 31.3200 -97.3300 251.000 30.0 243.754 4.310 -999.990 -999.990 2.438 ..P WKT 2010 12 24 23 34 55 31.3200 -97.3300 251.000 122.0 248.094 4.870 -999.990 -999.990 2.481 ..P WKT 2010 12 24 23 39 55 31.3200 -97.3300 251.000 457.0 250.831 4.620 -999.990 -999.990 2.508 ..P WKT 2010 12 24 23 44 55 31.3200 -97.3300 251.000 30.0 253.835 3.690 -999.990 -999.990 2.538 ..P WKT 2010 12 24 23 49 55 31.3200 -97.3300 251.000 122.0 255.770 5.260 -999.990 -999.990 2.558 ..P WKT 2010 12 25 00 09 55 31.3200 -97.3300 251.000 457.0 237.541 4.300 -999.990 -999.990 2.375 ..P WKT 2010 12 25 00 10 25 31.3200 -97.3300 251.000 457.0 235.953 3.760 -999.990 -999.990 2.360 ..P WKT 2010 12 25 00 10 55 31.3200 -97.3300 251.000 457.0 235.032 4.020 -999.990 -999.990 2.350 ..P WKT 2010 12 25 00 11 25 31.3200 -97.3300 251.000 457.0 233.843 4.140 -999.990 -999.990 2.338 ..P WKT 2010 12 25 00 11 55 31.3200 -97.3300 251.000 457.0 243.593 3.820 -999.990 -999.990 2.436 ..P WKT 2010 12 25 00 12 25 31.3200 -97.3300 251.000 457.0 236.669 4.390 -999.990 -999.990 2.367 ..P WKT 2010 12 25 00 12 55 31.3200 -97.3300 251.000 457.0 237.481 4.090 -999.990 -999.990 2.375 ..P WKT 2010 12 25 00 13 25 31.3200 -97.3300 251.000 457.0 241.495 4.120 -999.990 -999.990 2.415 ..P WKT 2010 12 25 00 13 55 31.3200 -97.3300 251.000 457.0 239.106 4.110 -999.990 -999.990 2.391 ..P WKT 2010 12 25 00 14 25 31.3200 -97.3300 251.000 457.0 239.651 3.970 -999.990 -999.990 2.397 ..P WKT 2010 12 25 00 14 55 31.3200 -97.3300 251.000 457.0 240.731 4.560 -999.990 -999.990 2.407 ..P WKT 2010 12 25 00 19 55 31.3200 -97.3300 251.000 30.0 240.852 4.430 -999.990 -999.990 2.409 ..P WKT 2010 12 25 00 24 55 31.3200 -97.3300 251.000 122.0 231.367 4.770 -999.990 -999.990 2.314 ..P WKT 2010 12 25 00 29 55 31.3200 -97.3300 251.000 457.0 234.156 3.770 -999.990 -999.990 2.342 ..P WKT 2010 12 25 00 34 55 31.3200 -97.3300 251.000 30.0 236.945 3.910 -999.990 -999.990 2.369 ..P WKT 2010 12 25 00 39 55 31.3200 -97.3300 251.000 122.0 234.397 3.860 -999.990 -999.990 2.344 ..P WKT 2010 12 25 00 44 55 31.3200 -97.3300 251.000 457.0 234.252 4.840 -999.990 -999.990 2.343 ..P WKT 2010 12 25 00 54 55 31.3200 -97.3300 251.000 30.0 228.390 3.790 -999.990 -999.990 2.284 ..P WKT 2010 12 25 00 59 55 31.3200 -97.3300 251.000 122.0 224.808 3.710 -999.990 -999.990 2.248 ..P WKT 2010 12 25 01 04 55 31.3200 -97.3300 251.000 457.0 203.883 3.880 -999.990 -999.990 2.039 ..P WKT 2010 12 25 01 09 55 31.3200 -97.3300 251.000 30.0 223.784 4.560 -999.990 -999.990 2.238 ..P WKT 2010 12 25 01 14 55 31.3200 -97.3300 251.000 122.0 222.070 4.450 -999.990 -999.990 2.221 ..P WKT 2010 12 25 01 19 55 31.3200 -97.3300 251.000 457.0 209.415 3.980 -999.990 -999.990 2.094 ..P WKT 2010 12 25 01 29 55 31.3200 -97.3300 251.000 30.0 215.367 3.550 -999.990 -999.990 2.154 ..P WKT 2010 12 25 01 34 55 31.3200 -97.3300 251.000 122.0 221.430 4.450 -999.990 -999.990 2.214 ..P WKT 2010 12 25 01 39 55 31.3200 -97.3300 251.000 457.0 222.423 4.830 -999.990 -999.990 2.224 ..P WKT 2010 12 25 01 44 55 31.3200 -97.3300 251.000 30.0 223.416 4.100 -999.990 -999.990 2.234 ..P WKT 2010 12 25 01 49 55 31.3200 -97.3300 251.000 122.0 220.940 3.690 -999.990 -999.990 2.209 ..P WKT 2010 12 25 01 54 55 31.3200 -97.3300 251.000 457.0 216.329 4.230 -999.990 -999.990 2.163 ..P WKT 2010 12 25 02 04 55 31.3200 -97.3300 251.000 30.0 217.744 3.740 -999.990 -999.990 2.177 ..P WKT 2010 12 25 02 09 55 31.3200 -97.3300 251.000 122.0 216.564 6.130 -999.990 -999.990 2.166 ..P WKT 2010 12 25 02 14 55 31.3200 -97.3300 251.000 457.0 210.847 4.190 -999.990 -999.990 2.108 ..P WKT 2010 12 25 02 19 55 31.3200 -97.3300 251.000 30.0 212.469 3.740 -999.990 -999.990 2.125 ..P WKT 2010 12 25 02 24 55 31.3200 -97.3300 251.000 122.0 215.559 3.960 -999.990 -999.990 2.156 ..P WKT 2010 12 25 02 29 55 31.3200 -97.3300 251.000 457.0 212.777 4.240 -999.990 -999.990 2.128 ..P WKT 2010 12 25 02 39 55 31.3200 -97.3300 251.000 30.0 210.913 5.430 -999.990 -999.990 2.109 ..P WKT 2010 12 25 02 44 55 31.3200 -97.3300 251.000 122.0 220.905 4.830 -999.990 -999.990 2.209 ..P WKT 2010 12 25 02 49 55 31.3200 -97.3300 251.000 457.0 218.085 5.530 -999.990 -999.990 2.181 ..P WKT 2010 12 25 02 54 55 31.3200 -97.3300 251.000 30.0 217.535 4.100 -999.990 -999.990 2.175 ..P WKT 2010 12 25 02 59 55 31.3200 -97.3300 251.000 122.0 217.784 4.070 -999.990 -999.990 2.178 ..P WKT 2010 12 25 03 04 55 31.3200 -97.3300 251.000 457.0 205.889 5.260 -999.990 -999.990 2.059 ..P WKT 2010 12 25 03 14 55 31.3200 -97.3300 251.000 30.0 210.449 4.440 -999.990 -999.990 2.104 ..P WKT 2010 12 25 03 19 55 31.3200 -97.3300 251.000 122.0 214.226 4.570 -999.990 -999.990 2.142 ..P WKT 2010 12 25 03 24 55 31.3200 -97.3300 251.000 457.0 211.864 4.560 -999.990 -999.990 2.119 ..P WKT 2010 12 25 03 29 55 31.3200 -97.3300 251.000 30.0 217.643 4.000 -999.990 -999.990 2.176 ..P WKT 2010 12 25 03 34 55 31.3200 -97.3300 251.000 122.0 214.614 4.140 -999.990 -999.990 2.146 ..P WKT 2010 12 25 03 39 55 31.3200 -97.3300 251.000 457.0 220.527 4.000 -999.990 -999.990 2.205 ..P WKT 2010 12 25 03 49 55 31.3200 -97.3300 251.000 30.0 220.454 3.970 -999.990 -999.990 2.205 ..P WKT 2010 12 25 03 54 55 31.3200 -97.3300 251.000 122.0 221.677 3.970 -999.990 -999.990 2.217 ..P WKT 2010 12 25 03 59 55 31.3200 -97.3300 251.000 457.0 221.564 4.310 -999.990 -999.990 2.216 ..P WKT 2010 12 25 04 04 55 31.3200 -97.3300 251.000 30.0 218.783 3.680 -999.990 -999.990 2.188 ..P WKT 2010 12 25 04 09 55 31.3200 -97.3300 251.000 122.0 216.267 3.720 -999.990 -999.990 2.163 ..P WKT 2010 12 25 04 14 55 31.3200 -97.3300 251.000 457.0 216.021 4.270 -999.990 -999.990 2.160 ..P WKT 2010 12 25 04 24 55 31.3200 -97.3300 251.000 30.0 209.293 3.960 -999.990 -999.990 2.093 ..P WKT 2010 12 25 04 29 55 31.3200 -97.3300 251.000 122.0 218.296 4.290 -999.990 -999.990 2.183 ..P WKT 2010 12 25 04 34 55 31.3200 -97.3300 251.000 457.0 207.810 3.860 -999.990 -999.990 2.078 ..P WKT 2010 12 25 04 39 55 31.3200 -97.3300 251.000 30.0 216.012 3.970 -999.990 -999.990 2.160 ..P WKT 2010 12 25 04 44 55 31.3200 -97.3300 251.000 122.0 219.942 4.090 -999.990 -999.990 2.199 ..P WKT 2010 12 25 04 49 55 31.3200 -97.3300 251.000 457.0 207.853 4.420 -999.990 -999.990 2.079 ..P WKT 2010 12 25 05 04 55 31.3200 -97.3300 251.000 30.0 202.910 4.080 -999.990 -999.990 2.029 ..P WKT 2010 12 25 05 09 55 31.3200 -97.3300 251.000 122.0 203.812 5.300 -999.990 -999.990 2.038 ..P WKT 2010 12 25 05 14 55 31.3200 -97.3300 251.000 457.0 194.835 3.870 -999.990 -999.990 1.948 ..P WKT 2010 12 25 05 19 55 31.3200 -97.3300 251.000 30.0 190.932 3.550 -999.990 -999.990 1.909 ..P WKT 2010 12 25 05 24 55 31.3200 -97.3300 251.000 122.0 187.829 4.630 -999.990 -999.990 1.878 ..P WKT 2010 12 25 05 29 55 31.3200 -97.3300 251.000 457.0 184.193 4.600 -999.990 -999.990 1.842 ..P WKT 2010 12 25 05 39 55 31.3200 -97.3300 251.000 30.0 195.073 3.800 -999.990 -999.990 1.951 ..P WKT 2010 12 25 05 44 55 31.3200 -97.3300 251.000 122.0 187.426 4.590 -999.990 -999.990 1.874 ..P WKT 2010 12 25 05 49 55 31.3200 -97.3300 251.000 457.0 175.774 3.920 -999.990 -999.990 1.758 ..P WKT 2010 12 25 05 54 55 31.3200 -97.3300 251.000 30.0 189.756 4.170 -999.990 -999.990 1.898 ..P WKT 2010 12 25 05 59 55 31.3200 -97.3300 251.000 122.0 186.382 4.250 -999.990 -999.990 1.864 ..P WKT 2010 12 25 06 04 55 31.3200 -97.3300 251.000 457.0 168.453 3.920 -999.990 -999.990 1.685 ..P WKT 2010 12 25 06 14 55 31.3200 -97.3300 251.000 30.0 186.253 4.580 -999.990 -999.990 1.863 ..P WKT 2010 12 25 06 19 55 31.3200 -97.3300 251.000 122.0 181.924 4.670 -999.990 -999.990 1.819 ..P WKT 2010 12 25 06 24 55 31.3200 -97.3300 251.000 457.0 167.714 5.620 -999.990 -999.990 1.677 ..P WKT 2010 12 25 06 29 55 31.3200 -97.3300 251.000 30.0 175.003 3.760 -999.990 -999.990 1.750 ..P WKT 2010 12 25 06 34 55 31.3200 -97.3300 251.000 122.0 171.341 3.330 -999.990 -999.990 1.713 ..P WKT 2010 12 25 06 39 55 31.3200 -97.3300 251.000 457.0 171.686 3.600 -999.990 -999.990 1.717 ..P WKT 2010 12 25 06 49 55 31.3200 -97.3300 251.000 30.0 170.029 3.270 -999.990 -999.990 1.700 ..P WKT 2010 12 25 06 54 55 31.3200 -97.3300 251.000 122.0 172.034 3.520 -999.990 -999.990 1.720 ..P WKT 2010 12 25 06 59 55 31.3200 -97.3300 251.000 457.0 179.647 5.740 -999.990 -999.990 1.796 ..P WKT 2010 12 25 07 04 55 31.3200 -97.3300 251.000 30.0 170.434 4.270 -999.990 -999.990 1.704 ..P WKT 2010 12 25 07 09 55 31.3200 -97.3300 251.000 122.0 176.979 4.130 -999.990 -999.990 1.770 ..P WKT 2010 12 25 07 14 55 31.3200 -97.3300 251.000 457.0 170.703 4.180 -999.990 -999.990 1.707 ..P WKT 2010 12 25 07 24 55 31.3200 -97.3300 251.000 30.0 163.609 4.330 -999.990 -999.990 1.636 ..P WKT 2010 12 25 07 29 55 31.3200 -97.3300 251.000 122.0 168.533 3.940 -999.990 -999.990 1.685 ..P WKT 2010 12 25 07 34 55 31.3200 -97.3300 251.000 457.0 175.994 4.510 -999.990 -999.990 1.760 ..P WKT 2010 12 25 07 39 55 31.3200 -97.3300 251.000 30.0 168.764 3.540 -999.990 -999.990 1.688 ..P WKT 2010 12 25 07 44 55 31.3200 -97.3300 251.000 122.0 175.824 4.530 -999.990 -999.990 1.758 ..P WKT 2010 12 25 07 49 55 31.3200 -97.3300 251.000 457.0 180.883 3.480 -999.990 -999.990 1.809 ..P WKT 2010 12 25 07 59 55 31.3200 -97.3300 251.000 30.0 172.241 4.800 -999.990 -999.990 1.722 ..P WKT 2010 12 25 08 04 55 31.3200 -97.3300 251.000 122.0 170.430 4.880 -999.990 -999.990 1.704 ..P WKT 2010 12 25 08 09 55 31.3200 -97.3300 251.000 457.0 177.167 3.530 -999.990 -999.990 1.772 ..P WKT 2010 12 25 08 14 55 31.3200 -97.3300 251.000 30.0 166.273 3.390 -999.990 -999.990 1.663 ..P WKT 2010 12 25 08 19 55 31.3200 -97.3300 251.000 122.0 165.797 3.380 -999.990 -999.990 1.658 ..P WKT 2010 12 25 08 24 55 31.3200 -97.3300 251.000 457.0 171.466 3.310 -999.990 -999.990 1.715 ..P WKT 2010 12 25 08 34 55 31.3200 -97.3300 251.000 30.0 164.351 3.380 -999.990 -999.990 1.644 ..P WKT 2010 12 25 08 39 55 31.3200 -97.3300 251.000 122.0 169.466 4.250 -999.990 -999.990 1.695 ..P WKT 2010 12 25 08 44 55 31.3200 -97.3300 251.000 457.0 166.300 3.470 -999.990 -999.990 1.663 ..P WKT 2010 12 25 08 49 55 31.3200 -97.3300 251.000 30.0 163.401 3.500 -999.990 -999.990 1.634 ..P WKT 2010 12 25 08 54 55 31.3200 -97.3300 251.000 122.0 168.249 3.880 -999.990 -999.990 1.682 ..P WKT 2010 12 25 08 59 55 31.3200 -97.3300 251.000 457.0 164.815 3.940 -999.990 -999.990 1.648 ..P WKT 2010 12 25 09 09 55 31.3200 -97.3300 251.000 30.0 165.848 3.770 -999.990 -999.990 1.658 ..P WKT 2010 12 25 09 14 55 31.3200 -97.3300 251.000 122.0 164.705 4.170 -999.990 -999.990 1.647 ..P WKT 2010 12 25 09 19 55 31.3200 -97.3300 251.000 457.0 157.683 3.450 -999.990 -999.990 1.577 ..P WKT 2010 12 25 09 24 55 31.3200 -97.3300 251.000 30.0 162.951 4.310 -999.990 -999.990 1.630 ..P WKT 2010 12 25 09 29 55 31.3200 -97.3300 251.000 122.0 165.281 3.760 -999.990 -999.990 1.653 ..P WKT 2010 12 25 09 34 55 31.3200 -97.3300 251.000 457.0 157.724 5.100 -999.990 -999.990 1.577 ..P WKT 2010 12 25 09 44 55 31.3200 -97.3300 251.000 30.0 164.655 4.120 -999.990 -999.990 1.647 ..P WKT 2010 12 25 09 49 55 31.3200 -97.3300 251.000 122.0 156.697 3.960 -999.990 -999.990 1.567 ..P WKT 2010 12 25 09 54 55 31.3200 -97.3300 251.000 457.0 161.565 3.570 -999.990 -999.990 1.616 ..P WKT 2010 12 25 09 59 55 31.3200 -97.3300 251.000 30.0 151.202 3.570 -999.990 -999.990 1.512 ..P WKT 2010 12 25 10 04 55 31.3200 -97.3300 251.000 122.0 156.739 3.930 -999.990 -999.990 1.567 ..P WKT 2010 12 25 10 09 55 31.3200 -97.3300 251.000 457.0 157.465 4.060 -999.990 -999.990 1.575 ..P WKT 2010 12 25 10 19 55 31.3200 -97.3300 251.000 30.0 162.526 4.350 -999.990 -999.990 1.625 ..P WKT 2010 12 25 10 24 55 31.3200 -97.3300 251.000 122.0 154.567 3.330 -999.990 -999.990 1.546 ..P WKT 2010 12 25 10 29 55 31.3200 -97.3300 251.000 457.0 159.035 4.110 -999.990 -999.990 1.590 ..P WKT 2010 12 25 10 34 55 31.3200 -97.3300 251.000 30.0 168.714 3.790 -999.990 -999.990 1.687 ..P WKT 2010 12 25 10 39 55 31.3200 -97.3300 251.000 122.0 170.243 5.470 -999.990 -999.990 1.702 ..P WKT 2010 12 25 10 44 55 31.3200 -97.3300 251.000 457.0 158.943 3.790 -999.990 -999.990 1.589 ..P WKT 2010 12 25 10 54 55 31.3200 -97.3300 251.000 30.0 169.292 3.750 -999.990 -999.990 1.693 ..P WKT 2010 12 25 10 59 55 31.3200 -97.3300 251.000 122.0 172.901 3.950 -999.990 -999.990 1.729 ..P WKT 2010 12 25 11 04 55 31.3200 -97.3300 251.000 457.0 161.277 4.300 -999.990 -999.990 1.613 ..P WKT 2010 12 25 11 09 55 31.3200 -97.3300 251.000 30.0 170.365 4.100 -999.990 -999.990 1.704 ..P WKT 2010 12 25 11 14 55 31.3200 -97.3300 251.000 122.0 165.556 5.530 -999.990 -999.990 1.656 ..P WKT 2010 12 25 11 19 55 31.3200 -97.3300 251.000 457.0 157.405 4.710 -999.990 -999.990 1.574 ..P WKT 2010 12 25 11 29 55 31.3200 -97.3300 251.000 30.0 161.684 4.940 -999.990 -999.990 1.617 ..P WKT 2010 12 25 11 34 55 31.3200 -97.3300 251.000 122.0 164.358 3.480 -999.990 -999.990 1.644 ..P WKT 2010 12 25 11 39 55 31.3200 -97.3300 251.000 457.0 161.820 5.130 -999.990 -999.990 1.618 ..P WKT 2010 12 25 11 44 55 31.3200 -97.3300 251.000 30.0 170.107 5.210 -999.990 -999.990 1.701 ..P WKT 2010 12 25 11 49 55 31.3200 -97.3300 251.000 122.0 163.827 3.940 -999.990 -999.990 1.638 ..P WKT 2010 12 25 12 09 55 31.3200 -97.3300 251.000 457.0 163.541 3.350 -999.990 -999.990 1.635 ..P WKT 2010 12 25 12 10 25 31.3200 -97.3300 251.000 457.0 166.991 2.940 -999.990 -999.990 1.670 ..P WKT 2010 12 25 12 10 55 31.3200 -97.3300 251.000 457.0 159.213 3.210 -999.990 -999.990 1.592 ..P WKT 2010 12 25 12 11 25 31.3200 -97.3300 251.000 457.0 163.999 2.960 -999.990 -999.990 1.640 ..P WKT 2010 12 25 12 11 55 31.3200 -97.3300 251.000 457.0 162.905 3.400 -999.990 -999.990 1.629 ..P WKT 2010 12 25 12 12 25 31.3200 -97.3300 251.000 457.0 155.929 3.260 -999.990 -999.990 1.559 ..P WKT 2010 12 25 12 12 55 31.3200 -97.3300 251.000 457.0 158.576 3.070 -999.990 -999.990 1.586 ..P WKT 2010 12 25 12 13 25 31.3200 -97.3300 251.000 457.0 162.560 4.960 -999.990 -999.990 1.626 ..P WKT 2010 12 25 12 13 55 31.3200 -97.3300 251.000 457.0 167.346 3.860 -999.990 -999.990 1.673 ..P WKT 2010 12 25 12 14 25 31.3200 -97.3300 251.000 457.0 163.846 3.240 -999.990 -999.990 1.638 ..P WKT 2010 12 25 12 14 55 31.3200 -97.3300 251.000 457.0 161.949 3.210 -999.990 -999.990 1.619 ..P WKT 2010 12 25 12 19 55 31.3200 -97.3300 251.000 30.0 156.347 3.090 -999.990 -999.990 1.563 ..P WKT 2010 12 25 12 24 55 31.3200 -97.3300 251.000 122.0 161.171 3.270 -999.990 -999.990 1.612 ..P WKT 2010 12 25 12 29 55 31.3200 -97.3300 251.000 457.0 158.777 3.450 -999.990 -999.990 1.588 ..P WKT 2010 12 25 12 34 55 31.3200 -97.3300 251.000 30.0 157.452 3.420 -999.990 -999.990 1.575 ..P WKT 2010 12 25 12 39 55 31.3200 -97.3300 251.000 122.0 163.078 3.510 -999.990 -999.990 1.631 ..P WKT 2010 12 25 12 44 55 31.3200 -97.3300 251.000 457.0 162.555 3.660 -999.990 -999.990 1.626 ..P WKT 2010 12 25 12 54 55 31.3200 -97.3300 251.000 30.0 159.073 3.390 -999.990 -999.990 1.591 ..P WKT 2010 12 25 12 59 55 31.3200 -97.3300 251.000 122.0 155.313 3.630 -999.990 -999.990 1.553 ..P WKT 2010 12 25 13 04 55 31.3200 -97.3300 251.000 457.0 163.583 4.220 -999.990 -999.990 1.636 ..P WKT 2010 12 25 13 09 55 31.3200 -97.3300 251.000 30.0 153.673 5.050 -999.990 -999.990 1.537 ..P WKT 2010 12 25 13 14 55 31.3200 -97.3300 251.000 122.0 159.002 4.870 -999.990 -999.990 1.590 ..P WKT 2010 12 25 13 19 55 31.3200 -97.3300 251.000 457.0 154.439 4.990 -999.990 -999.990 1.544 ..P WKT 2010 12 25 13 29 55 31.3200 -97.3300 251.000 30.0 151.901 4.960 -999.990 -999.990 1.519 ..P WKT 2010 12 25 13 34 55 31.3200 -97.3300 251.000 122.0 161.680 5.160 -999.990 -999.990 1.617 ..P WKT 2010 12 25 13 39 55 31.3200 -97.3300 251.000 457.0 159.161 5.020 -999.990 -999.990 1.592 ..P WKT 2010 12 25 13 44 55 31.3200 -97.3300 251.000 30.0 156.641 4.790 -999.990 -999.990 1.566 ..P WKT 2010 12 25 13 49 55 31.3200 -97.3300 251.000 122.0 158.934 4.130 -999.990 -999.990 1.589 ..P WKT 2010 12 25 13 54 55 31.3200 -97.3300 251.000 457.0 158.955 4.410 -999.990 -999.990 1.590 ..P WKT 2010 12 25 14 04 55 31.3200 -97.3300 251.000 30.0 159.205 6.420 -999.990 -999.990 1.592 ..P WKT 2010 12 25 14 09 55 31.3200 -97.3300 251.000 122.0 154.221 5.020 -999.990 -999.990 1.542 ..P WKT 2010 12 25 14 14 55 31.3200 -97.3300 251.000 457.0 154.987 3.680 -999.990 -999.990 1.550 ..P WKT 2010 12 25 14 19 55 31.3200 -97.3300 251.000 30.0 152.677 3.820 -999.990 -999.990 1.527 ..P WKT 2010 12 25 14 24 55 31.3200 -97.3300 251.000 122.0 149.966 3.990 -999.990 -999.990 1.500 ..P WKT 2010 12 25 14 29 55 31.3200 -97.3300 251.000 457.0 158.085 3.960 -999.990 -999.990 1.581 ..P WKT 2010 12 25 14 39 55 31.3200 -97.3300 251.000 30.0 153.828 3.830 -999.990 -999.990 1.538 ..P WKT 2010 12 25 14 44 55 31.3200 -97.3300 251.000 122.0 158.566 4.280 -999.990 -999.990 1.586 ..P WKT 2010 12 25 14 49 55 31.3200 -97.3300 251.000 457.0 153.811 5.740 -999.990 -999.990 1.538 ..P WKT 2010 12 25 14 54 55 31.3200 -97.3300 251.000 30.0 161.758 4.420 -999.990 -999.990 1.618 ..P WKT 2010 12 25 14 59 55 31.3200 -97.3300 251.000 122.0 161.951 4.300 -999.990 -999.990 1.620 ..P WKT 2010 12 25 15 04 55 31.3200 -97.3300 251.000 457.0 155.324 4.400 -999.990 -999.990 1.553 ..P WKT 2010 12 25 15 14 55 31.3200 -97.3300 251.000 30.0 157.484 4.280 -999.990 -999.990 1.575 ..P WKT 2010 12 25 15 19 55 31.3200 -97.3300 251.000 122.0 157.046 4.410 -999.990 -999.990 1.570 ..P WKT 2010 12 25 15 24 55 31.3200 -97.3300 251.000 457.0 155.806 4.690 -999.990 -999.990 1.558 ..P WKT 2010 12 25 15 29 55 31.3200 -97.3300 251.000 30.0 154.298 4.960 -999.990 -999.990 1.543 ..P WKT 2010 12 25 15 34 55 31.3200 -97.3300 251.000 122.0 154.796 4.720 -999.990 -999.990 1.548 ..P WKT 2010 12 25 15 39 55 31.3200 -97.3300 251.000 457.0 153.689 5.170 -999.990 -999.990 1.537 ..P WKT 2010 12 25 15 49 55 31.3200 -97.3300 251.000 30.0 154.933 4.870 -999.990 -999.990 1.549 ..P WKT 2010 12 25 15 54 55 31.3200 -97.3300 251.000 122.0 151.534 4.690 -999.990 -999.990 1.515 ..P WKT 2010 12 25 15 59 55 31.3200 -97.3300 251.000 457.0 152.147 5.020 -999.990 -999.990 1.521 ..P WKT 2010 12 25 16 04 55 31.3200 -97.3300 251.000 30.0 159.846 4.630 -999.990 -999.990 1.598 ..P WKT 2010 12 25 16 09 55 31.3200 -97.3300 251.000 122.0 156.581 4.170 -999.990 -999.990 1.566 ..P WKT 2010 12 25 16 14 55 31.3200 -97.3300 251.000 457.0 151.979 4.190 -999.990 -999.990 1.520 ..P WKT 2010 12 25 16 24 55 31.3200 -97.3300 251.000 30.0 163.749 4.160 -999.990 -999.990 1.637 ..P WKT 2010 12 25 16 29 55 31.3200 -97.3300 251.000 122.0 156.853 4.600 -999.990 -999.990 1.569 ..P WKT 2010 12 25 16 34 55 31.3200 -97.3300 251.000 457.0 152.900 4.780 -999.990 -999.990 1.529 ..P WKT 2010 12 25 16 39 55 31.3200 -97.3300 251.000 30.0 157.772 4.420 -999.990 -999.990 1.578 ..P WKT 2010 12 25 16 44 55 31.3200 -97.3300 251.000 122.0 160.773 4.260 -999.990 -999.990 1.608 ..P WKT 2010 12 25 16 49 55 31.3200 -97.3300 251.000 457.0 158.692 4.270 -999.990 -999.990 1.587 ..P WKT 2010 12 25 17 04 55 31.3200 -97.3300 251.000 30.0 162.259 4.480 -999.990 -999.990 1.623 ..P WKT 2010 12 25 17 09 55 31.3200 -97.3300 251.000 122.0 161.070 4.290 -999.990 -999.990 1.611 ..P WKT 2010 12 25 17 14 55 31.3200 -97.3300 251.000 457.0 156.405 5.320 -999.990 -999.990 1.564 ..P WKT 2010 12 25 17 19 55 31.3200 -97.3300 251.000 30.0 153.880 6.710 -999.990 -999.990 1.539 ..P WKT 2010 12 25 17 24 55 31.3200 -97.3300 251.000 122.0 157.238 4.280 -999.990 -999.990 1.572 ..P WKT 2010 12 25 17 29 55 31.3200 -97.3300 251.000 457.0 161.132 4.500 -999.990 -999.990 1.611 ..P WKT 2010 12 25 17 39 55 31.3200 -97.3300 251.000 30.0 157.940 4.260 -999.990 -999.990 1.579 ..P WKT 2010 12 25 17 44 55 31.3200 -97.3300 251.000 122.0 163.157 4.560 -999.990 -999.990 1.632 ..P WKT 2010 12 25 17 49 55 31.3200 -97.3300 251.000 457.0 160.751 4.950 -999.990 -999.990 1.608 ..P WKT 2010 12 25 17 54 55 31.3200 -97.3300 251.000 30.0 165.433 4.720 -999.990 -999.990 1.654 ..P WKT 2010 12 25 17 59 55 31.3200 -97.3300 251.000 122.0 165.435 4.750 -999.990 -999.990 1.654 ..P WKT 2010 12 25 18 04 55 31.3200 -97.3300 251.000 457.0 163.965 4.950 -999.990 -999.990 1.640 ..P WKT 2010 12 25 18 14 55 31.3200 -97.3300 251.000 30.0 170.330 4.760 -999.990 -999.990 1.703 ..P WKT 2010 12 25 18 19 55 31.3200 -97.3300 251.000 122.0 171.344 5.620 -999.990 -999.990 1.713 ..P WKT 2010 12 25 18 24 55 31.3200 -97.3300 251.000 457.0 166.071 4.780 -999.990 -999.990 1.661 ..P WKT 2010 12 25 18 29 55 31.3200 -97.3300 251.000 30.0 168.423 4.700 -999.990 -999.990 1.684 ..P WKT 2010 12 25 18 34 55 31.3200 -97.3300 251.000 122.0 167.565 5.430 -999.990 -999.990 1.676 ..P WKT 2010 12 25 18 39 55 31.3200 -97.3300 251.000 457.0 169.247 4.630 -999.990 -999.990 1.692 ..P WKT 2010 12 25 18 49 55 31.3200 -97.3300 251.000 30.0 173.702 4.820 -999.990 -999.990 1.737 ..P WKT 2010 12 25 18 54 55 31.3200 -97.3300 251.000 122.0 171.658 4.890 -999.990 -999.990 1.717 ..P WKT 2010 12 25 18 59 55 31.3200 -97.3300 251.000 457.0 177.106 5.530 -999.990 -999.990 1.771 ..P WKT 2010 12 25 19 04 55 31.3200 -97.3300 251.000 30.0 172.922 5.540 -999.990 -999.990 1.729 ..P WKT 2010 12 25 19 09 55 31.3200 -97.3300 251.000 122.0 169.809 5.460 -999.990 -999.990 1.698 ..P WKT 2010 12 25 19 14 55 31.3200 -97.3300 251.000 457.0 168.434 5.340 -999.990 -999.990 1.684 ..P WKT 2010 12 25 19 24 55 31.3200 -97.3300 251.000 30.0 168.361 5.410 -999.990 -999.990 1.684 ..P WKT 2010 12 25 19 29 55 31.3200 -97.3300 251.000 122.0 168.457 5.690 -999.990 -999.990 1.685 ..P WKT 2010 12 25 19 34 55 31.3200 -97.3300 251.000 457.0 175.376 5.740 -999.990 -999.990 1.754 ..P WKT 2010 12 25 19 39 55 31.3200 -97.3300 251.000 30.0 168.116 5.680 -999.990 -999.990 1.681 ..P WKT 2010 12 25 19 44 55 31.3200 -97.3300 251.000 122.0 163.397 6.020 -999.990 -999.990 1.634 ..P WKT 2010 12 25 19 49 55 31.3200 -97.3300 251.000 457.0 169.647 6.670 -999.990 -999.990 1.696 ..P WKT 2010 12 25 19 59 55 31.3200 -97.3300 251.000 30.0 172.344 6.680 -999.990 -999.990 1.723 ..P WKT 2010 12 25 20 04 55 31.3200 -97.3300 251.000 122.0 163.842 5.700 -999.990 -999.990 1.638 ..P WKT 2010 12 25 20 09 55 31.3200 -97.3300 251.000 457.0 164.703 5.390 -999.990 -999.990 1.647 ..P WKT 2010 12 25 20 14 55 31.3200 -97.3300 251.000 30.0 169.845 5.400 -999.990 -999.990 1.698 ..P WKT 2010 12 25 20 19 55 31.3200 -97.3300 251.000 122.0 163.749 5.040 -999.990 -999.990 1.637 ..P WKT 2010 12 25 20 24 55 31.3200 -97.3300 251.000 457.0 157.386 5.600 -999.990 -999.990 1.574 ..P WKT 2010 12 25 20 34 55 31.3200 -97.3300 251.000 30.0 165.339 4.920 -999.990 -999.990 1.653 ..P WKT 2010 12 25 20 39 55 31.3200 -97.3300 251.000 122.0 167.080 5.190 -999.990 -999.990 1.671 ..P WKT 2010 12 25 20 44 55 31.3200 -97.3300 251.000 457.0 162.131 5.320 -999.990 -999.990 1.621 ..P WKT 2010 12 25 20 49 55 31.3200 -97.3300 251.000 30.0 161.463 6.110 -999.990 -999.990 1.615 ..P WKT 2010 12 25 20 54 55 31.3200 -97.3300 251.000 122.0 161.331 5.960 -999.990 -999.990 1.613 ..P WKT 2010 12 25 20 59 55 31.3200 -97.3300 251.000 457.0 153.439 4.990 -999.990 -999.990 1.534 ..P WKT 2010 12 25 21 09 55 31.3200 -97.3300 251.000 30.0 155.964 5.270 -999.990 -999.990 1.560 ..P WKT 2010 12 25 21 14 55 31.3200 -97.3300 251.000 122.0 158.354 5.550 -999.990 -999.990 1.584 ..P WKT 2010 12 25 21 19 55 31.3200 -97.3300 251.000 457.0 159.139 6.140 -999.990 -999.990 1.591 ..P WKT 2010 12 25 21 24 55 31.3200 -97.3300 251.000 30.0 154.572 6.070 -999.990 -999.990 1.546 ..P WKT 2010 12 25 21 29 55 31.3200 -97.3300 251.000 122.0 154.822 5.060 -999.990 -999.990 1.548 ..P WKT 2010 12 25 21 34 55 31.3200 -97.3300 251.000 457.0 158.283 6.160 -999.990 -999.990 1.583 ..P WKT 2010 12 25 21 44 55 31.3200 -97.3300 251.000 30.0 158.743 5.030 -999.990 -999.990 1.587 ..P WKT 2010 12 25 21 49 55 31.3200 -97.3300 251.000 122.0 164.173 5.770 -999.990 -999.990 1.642 ..P WKT 2010 12 25 21 54 55 31.3200 -97.3300 251.000 457.0 164.250 5.220 -999.990 -999.990 1.643 ..P WKT 2010 12 25 21 59 55 31.3200 -97.3300 251.000 30.0 164.328 5.480 -999.990 -999.990 1.643 ..P WKT 2010 12 25 22 04 55 31.3200 -97.3300 251.000 122.0 163.871 5.380 -999.990 -999.990 1.639 ..P WKT 2010 12 25 22 09 55 31.3200 -97.3300 251.000 457.0 163.548 5.650 -999.990 -999.990 1.635 ..P WKT 2010 12 25 22 19 55 31.3200 -97.3300 251.000 30.0 164.085 5.280 -999.990 -999.990 1.641 ..P WKT 2010 12 25 22 24 55 31.3200 -97.3300 251.000 122.0 169.362 5.750 -999.990 -999.990 1.694 ..P WKT 2010 12 25 22 29 55 31.3200 -97.3300 251.000 457.0 160.322 5.340 -999.990 -999.990 1.603 ..P WKT 2010 12 25 22 34 55 31.3200 -97.3300 251.000 30.0 163.993 6.220 -999.990 -999.990 1.640 ..P WKT 2010 12 25 22 39 55 31.3200 -97.3300 251.000 122.0 164.989 5.580 -999.990 -999.990 1.650 ..P WKT 2010 12 25 22 44 55 31.3200 -97.3300 251.000 457.0 163.709 5.540 -999.990 -999.990 1.637 ..P WKT 2010 12 25 22 54 55 31.3200 -97.3300 251.000 30.0 162.565 5.300 -999.990 -999.990 1.626 ..P WKT 2010 12 25 22 59 55 31.3200 -97.3300 251.000 122.0 159.220 5.390 -999.990 -999.990 1.592 ..P WKT 2010 12 25 23 04 55 31.3200 -97.3300 251.000 457.0 167.785 5.880 -999.990 -999.990 1.678 ..P WKT 2010 12 25 23 09 55 31.3200 -97.3300 251.000 30.0 160.160 5.520 -999.990 -999.990 1.602 ..P WKT 2010 12 25 23 14 55 31.3200 -97.3300 251.000 122.0 163.105 5.710 -999.990 -999.990 1.631 ..P WKT 2010 12 25 23 19 55 31.3200 -97.3300 251.000 457.0 162.570 6.410 -999.990 -999.990 1.626 ..P WKT 2010 12 25 23 29 55 31.3200 -97.3300 251.000 30.0 163.490 5.780 -999.990 -999.990 1.635 ..P WKT 2010 12 25 23 34 55 31.3200 -97.3300 251.000 122.0 165.747 5.760 -999.990 -999.990 1.657 ..P WKT 2010 12 25 23 39 55 31.3200 -97.3300 251.000 457.0 170.546 5.700 -999.990 -999.990 1.705 ..P WKT 2010 12 25 23 44 55 31.3200 -97.3300 251.000 30.0 169.592 5.540 -999.990 -999.990 1.696 ..P WKT 2010 12 25 23 49 55 31.3200 -97.3300 251.000 122.0 171.983 5.740 -999.990 -999.990 1.720 ..P WKT 2010 12 26 00 09 55 31.3200 -97.3300 251.000 457.0 171.808 5.780 -999.990 -999.990 1.718 ..P WKT 2010 12 26 00 10 25 31.3200 -97.3300 251.000 457.0 168.635 5.880 -999.990 -999.990 1.686 ..P WKT 2010 12 26 00 10 55 31.3200 -97.3300 251.000 457.0 167.871 5.430 -999.990 -999.990 1.679 ..P WKT 2010 12 26 00 11 25 31.3200 -97.3300 251.000 457.0 166.036 5.410 -999.990 -999.990 1.660 ..P WKT 2010 12 26 00 11 55 31.3200 -97.3300 251.000 457.0 167.947 5.660 -999.990 -999.990 1.679 ..P WKT 2010 12 26 00 12 25 31.3200 -97.3300 251.000 457.0 164.775 5.950 -999.990 -999.990 1.648 ..P WKT 2010 12 26 00 12 55 31.3200 -97.3300 251.000 457.0 164.546 5.680 -999.990 -999.990 1.645 ..P WKT 2010 12 26 00 13 25 31.3200 -97.3300 251.000 457.0 168.598 5.470 -999.990 -999.990 1.686 ..P WKT 2010 12 26 00 13 55 31.3200 -97.3300 251.000 457.0 165.157 5.470 -999.990 -999.990 1.652 ..P WKT 2010 12 26 00 14 25 31.3200 -97.3300 251.000 457.0 169.744 6.590 -999.990 -999.990 1.697 ..P WKT 2010 12 26 00 14 55 31.3200 -97.3300 251.000 457.0 168.980 5.830 -999.990 -999.990 1.690 ..P WKT 2010 12 26 00 19 55 31.3200 -97.3300 251.000 30.0 162.674 5.640 -999.990 -999.990 1.627 ..P WKT 2010 12 26 00 24 55 31.3200 -97.3300 251.000 122.0 164.394 5.780 -999.990 -999.990 1.644 ..P WKT 2010 12 26 00 29 55 31.3200 -97.3300 251.000 457.0 161.835 6.230 -999.990 -999.990 1.618 ..P WKT 2010 12 26 00 34 55 31.3200 -97.3300 251.000 30.0 165.696 6.480 -999.990 -999.990 1.657 ..P WKT 2010 12 26 00 39 55 31.3200 -97.3300 251.000 122.0 168.220 5.940 -999.990 -999.990 1.682 ..P WKT 2010 12 26 00 44 55 31.3200 -97.3300 251.000 457.0 167.265 5.840 -999.990 -999.990 1.673 ..P WKT 2010 12 26 00 54 55 31.3200 -97.3300 251.000 30.0 169.899 6.180 -999.990 -999.990 1.699 ..P WKT 2010 12 26 00 59 55 31.3200 -97.3300 251.000 122.0 166.266 6.250 -999.990 -999.990 1.663 ..P WKT 2010 12 26 01 04 55 31.3200 -97.3300 251.000 457.0 160.492 6.260 -999.990 -999.990 1.605 ..P WKT 2010 12 26 01 09 55 31.3200 -97.3300 251.000 30.0 167.290 7.970 -999.990 -999.990 1.673 ..P WKT 2010 12 26 01 14 55 31.3200 -97.3300 251.000 122.0 160.448 5.860 -999.990 -999.990 1.604 ..P WKT 2010 12 26 01 19 55 31.3200 -97.3300 251.000 457.0 162.966 5.400 -999.990 -999.990 1.630 ..P WKT 2010 12 26 01 29 55 31.3200 -97.3300 251.000 30.0 164.183 5.690 -999.990 -999.990 1.642 ..P WKT 2010 12 26 01 34 55 31.3200 -97.3300 251.000 122.0 165.287 5.520 -999.990 -999.990 1.653 ..P WKT 2010 12 26 01 39 55 31.3200 -97.3300 251.000 457.0 161.311 5.630 -999.990 -999.990 1.613 ..P WKT 2010 12 26 01 44 55 31.3200 -97.3300 251.000 30.0 157.870 5.960 -999.990 -999.990 1.579 ..P WKT 2010 12 26 01 49 55 31.3200 -97.3300 251.000 122.0 157.504 6.720 -999.990 -999.990 1.575 ..P WKT 2010 12 26 01 54 55 31.3200 -97.3300 251.000 457.0 158.475 5.450 -999.990 -999.990 1.585 ..P WKT 2010 12 26 02 04 55 31.3200 -97.3300 251.000 30.0 162.365 6.570 -999.990 -999.990 1.624 ..P WKT 2010 12 26 02 09 55 31.3200 -97.3300 251.000 122.0 156.996 6.100 -999.990 -999.990 1.570 ..P WKT 2010 12 26 02 14 55 31.3200 -97.3300 251.000 457.0 165.662 6.000 -999.990 -999.990 1.657 ..P WKT 2010 12 26 02 19 55 31.3200 -97.3300 251.000 30.0 160.293 5.920 -999.990 -999.990 1.603 ..P WKT 2010 12 26 02 24 55 31.3200 -97.3300 251.000 122.0 164.280 7.310 -999.990 -999.990 1.643 ..P WKT 2010 12 26 02 29 55 31.3200 -97.3300 251.000 457.0 163.857 6.210 -999.990 -999.990 1.639 ..P WKT 2010 12 26 02 39 55 31.3200 -97.3300 251.000 30.0 163.259 5.980 -999.990 -999.990 1.633 ..P WKT 2010 12 26 02 44 55 31.3200 -97.3300 251.000 122.0 168.429 6.450 -999.990 -999.990 1.684 ..P WKT 2010 12 26 02 49 55 31.3200 -97.3300 251.000 457.0 161.573 6.050 -999.990 -999.990 1.616 ..P WKT 2010 12 26 02 54 55 31.3200 -97.3300 251.000 30.0 165.406 5.710 -999.990 -999.990 1.654 ..P WKT 2010 12 26 02 59 55 31.3200 -97.3300 251.000 122.0 172.447 7.210 -999.990 -999.990 1.724 ..P WKT 2010 12 26 03 04 55 31.3200 -97.3300 251.000 457.0 170.668 5.570 -999.990 -999.990 1.707 ..P WKT 2010 12 26 03 14 55 31.3200 -97.3300 251.000 30.0 175.757 5.840 -999.990 -999.990 1.758 ..P WKT 2010 12 26 03 19 55 31.3200 -97.3300 251.000 122.0 172.470 6.000 -999.990 -999.990 1.725 ..P WKT 2010 12 26 03 24 55 31.3200 -97.3300 251.000 457.0 168.784 6.040 -999.990 -999.990 1.688 ..P WKT 2010 12 26 03 29 55 31.3200 -97.3300 251.000 30.0 177.387 6.600 -999.990 -999.990 1.774 ..P WKT 2010 12 26 03 34 55 31.3200 -97.3300 251.000 122.0 171.563 5.500 -999.990 -999.990 1.716 ..P WKT 2010 12 26 03 39 55 31.3200 -97.3300 251.000 457.0 176.158 5.670 -999.990 -999.990 1.762 ..P WKT 2010 12 26 03 49 55 31.3200 -97.3300 251.000 30.0 173.479 5.530 -999.990 -999.990 1.735 ..P WKT 2010 12 26 03 54 55 31.3200 -97.3300 251.000 122.0 170.613 5.490 -999.990 -999.990 1.706 ..P WKT 2010 12 26 03 59 55 31.3200 -97.3300 251.000 457.0 171.755 5.580 -999.990 -999.990 1.718 ..P WKT 2010 12 26 04 04 55 31.3200 -97.3300 251.000 30.0 167.554 5.510 -999.990 -999.990 1.676 ..P WKT 2010 12 26 04 09 55 31.3200 -97.3300 251.000 122.0 165.758 5.490 -999.990 -999.990 1.658 ..P WKT 2010 12 26 04 14 55 31.3200 -97.3300 251.000 457.0 161.557 5.500 -999.990 -999.990 1.616 ..P WKT 2010 12 26 04 24 55 31.3200 -97.3300 251.000 30.0 170.898 5.450 -999.990 -999.990 1.709 ..P WKT 2010 12 26 04 29 55 31.3200 -97.3300 251.000 122.0 166.011 5.410 -999.990 -999.990 1.660 ..P WKT 2010 12 26 04 34 55 31.3200 -97.3300 251.000 457.0 167.533 5.790 -999.990 -999.990 1.675 ..P WKT 2010 12 26 04 39 55 31.3200 -97.3300 251.000 30.0 170.391 5.700 -999.990 -999.990 1.704 ..P WKT 2010 12 26 04 44 55 31.3200 -97.3300 251.000 122.0 173.248 5.790 -999.990 -999.990 1.732 ..P WKT 2010 12 26 04 49 55 31.3200 -97.3300 251.000 457.0 169.431 5.860 -999.990 -999.990 1.694 ..P WKT 2010 12 26 05 04 55 31.3200 -97.3300 251.000 30.0 169.678 5.930 -999.990 -999.990 1.697 ..P WKT 2010 12 26 05 09 55 31.3200 -97.3300 251.000 122.0 167.572 5.730 -999.990 -999.990 1.676 ..P WKT 2010 12 26 05 14 55 31.3200 -97.3300 251.000 457.0 159.861 5.970 -999.990 -999.990 1.599 ..P WKT 2010 12 26 05 19 55 31.3200 -97.3300 251.000 30.0 172.704 6.360 -999.990 -999.990 1.727 ..P WKT 2010 12 26 05 24 55 31.3200 -97.3300 251.000 122.0 171.399 5.830 -999.990 -999.990 1.714 ..P WKT 2010 12 26 05 29 55 31.3200 -97.3300 251.000 457.0 151.143 5.580 -999.990 -999.990 1.511 ..P WKT 2010 12 26 05 39 55 31.3200 -97.3300 251.000 30.0 170.464 6.230 -999.990 -999.990 1.705 ..P WKT 2010 12 26 05 44 55 31.3200 -97.3300 251.000 122.0 175.474 5.910 -999.990 -999.990 1.755 ..P WKT 2010 12 26 05 49 55 31.3200 -97.3300 251.000 457.0 156.198 5.850 -999.990 -999.990 1.562 ..P WKT 2010 12 26 05 54 55 31.3200 -97.3300 251.000 30.0 173.884 7.820 -999.990 -999.990 1.739 ..P WKT 2010 12 26 05 59 55 31.3200 -97.3300 251.000 122.0 176.892 6.050 -999.990 -999.990 1.769 ..P WKT 2010 12 26 06 04 55 31.3200 -97.3300 251.000 457.0 154.817 5.460 -999.990 -999.990 1.548 ..P WKT 2010 12 26 06 14 55 31.3200 -97.3300 251.000 30.0 176.691 5.850 -999.990 -999.990 1.767 ..P WKT 2010 12 26 06 19 55 31.3200 -97.3300 251.000 122.0 181.146 5.730 -999.990 -999.990 1.811 ..P WKT 2010 12 26 06 24 55 31.3200 -97.3300 251.000 457.0 148.784 5.480 -999.990 -999.990 1.488 ..P WKT 2010 12 26 06 29 55 31.3200 -97.3300 251.000 30.0 171.915 6.540 -999.990 -999.990 1.719 ..P WKT 2010 12 26 06 34 55 31.3200 -97.3300 251.000 122.0 175.037 5.950 -999.990 -999.990 1.750 ..P WKT 2010 12 26 06 39 55 31.3200 -97.3300 251.000 457.0 150.815 5.810 -999.990 -999.990 1.508 ..P WKT 2010 12 26 06 49 55 31.3200 -97.3300 251.000 30.0 171.272 6.370 -999.990 -999.990 1.713 ..P WKT 2010 12 26 06 54 55 31.3200 -97.3300 251.000 122.0 174.336 5.660 -999.990 -999.990 1.743 ..P WKT 2010 12 26 06 59 55 31.3200 -97.3300 251.000 457.0 146.194 6.230 -999.990 -999.990 1.462 ..P WKT 2010 12 26 07 04 55 31.3200 -97.3300 251.000 30.0 176.596 5.890 -999.990 -999.990 1.766 ..P WKT 2010 12 26 07 09 55 31.3200 -97.3300 251.000 122.0 173.391 6.350 -999.990 -999.990 1.734 ..P WKT 2010 12 26 07 14 55 31.3200 -97.3300 251.000 457.0 144.319 6.170 -999.990 -999.990 1.443 ..P WKT 2010 12 26 07 24 55 31.3200 -97.3300 251.000 30.0 170.714 6.130 -999.990 -999.990 1.707 ..P WKT 2010 12 26 07 29 55 31.3200 -97.3300 251.000 122.0 172.577 5.950 -999.990 -999.990 1.726 ..P WKT 2010 12 26 07 34 55 31.3200 -97.3300 251.000 457.0 141.776 5.550 -999.990 -999.990 1.418 ..P WKT 2010 12 26 07 39 55 31.3200 -97.3300 251.000 30.0 168.837 5.780 -999.990 -999.990 1.688 ..P WKT 2010 12 26 07 44 55 31.3200 -97.3300 251.000 122.0 171.367 5.950 -999.990 -999.990 1.714 ..P WKT 2010 12 26 07 49 55 31.3200 -97.3300 251.000 457.0 141.103 5.190 -999.990 -999.990 1.411 ..P WKT 2010 12 26 07 59 55 31.3200 -97.3300 251.000 30.0 166.215 5.200 -999.990 -999.990 1.662 ..P WKT 2010 12 26 08 04 55 31.3200 -97.3300 251.000 122.0 165.602 5.790 -999.990 -999.990 1.656 ..P WKT 2010 12 26 08 09 55 31.3200 -97.3300 251.000 457.0 144.997 6.800 -999.990 -999.990 1.450 ..P WKT 2010 12 26 08 14 55 31.3200 -97.3300 251.000 30.0 163.844 6.430 -999.990 -999.990 1.638 ..P WKT 2010 12 26 08 19 55 31.3200 -97.3300 251.000 122.0 169.096 5.760 -999.990 -999.990 1.691 ..P WKT 2010 12 26 08 24 55 31.3200 -97.3300 251.000 457.0 141.562 6.220 -999.990 -999.990 1.416 ..P WKT 2010 12 26 08 34 55 31.3200 -97.3300 251.000 30.0 171.978 5.650 -999.990 -999.990 1.720 ..P WKT 2010 12 26 08 39 55 31.3200 -97.3300 251.000 122.0 173.688 5.660 -999.990 -999.990 1.737 ..P WKT 2010 12 26 08 44 55 31.3200 -97.3300 251.000 457.0 142.886 5.370 -999.990 -999.990 1.429 ..P WKT 2010 12 26 08 49 55 31.3200 -97.3300 251.000 30.0 180.305 5.850 -999.990 -999.990 1.803 ..P WKT 2010 12 26 08 54 55 31.3200 -97.3300 251.000 122.0 178.817 5.810 -999.990 -999.990 1.788 ..P WKT 2010 12 26 08 59 55 31.3200 -97.3300 251.000 457.0 145.886 5.160 -999.990 -999.990 1.459 ..P WKT 2010 12 26 09 09 55 31.3200 -97.3300 251.000 30.0 178.216 5.670 -999.990 -999.990 1.782 ..P WKT 2010 12 26 09 14 55 31.3200 -97.3300 251.000 122.0 169.934 5.720 -999.990 -999.990 1.699 ..P WKT 2010 12 26 09 19 55 31.3200 -97.3300 251.000 457.0 146.199 5.960 -999.990 -999.990 1.462 ..P WKT 2010 12 26 09 24 55 31.3200 -97.3300 251.000 30.0 171.487 5.750 -999.990 -999.990 1.715 ..P WKT 2010 12 26 09 29 55 31.3200 -97.3300 251.000 122.0 165.603 5.840 -999.990 -999.990 1.656 ..P WKT 2010 12 26 09 34 55 31.3200 -97.3300 251.000 457.0 135.479 5.130 -999.990 -999.990 1.355 ..P WKT 2010 12 26 09 44 55 31.3200 -97.3300 251.000 30.0 169.418 5.570 -999.990 -999.990 1.694 ..P WKT 2010 12 26 09 49 55 31.3200 -97.3300 251.000 122.0 163.554 5.670 -999.990 -999.990 1.636 ..P WKT 2010 12 26 09 54 55 31.3200 -97.3300 251.000 457.0 141.711 5.690 -999.990 -999.990 1.417 ..P WKT 2010 12 26 09 59 55 31.3200 -97.3300 251.000 30.0 166.345 5.760 -999.990 -999.990 1.663 ..P WKT 2010 12 26 10 04 55 31.3200 -97.3300 251.000 122.0 164.876 5.190 -999.990 -999.990 1.649 ..P WKT 2010 12 26 10 09 55 31.3200 -97.3300 251.000 457.0 135.978 5.570 -999.990 -999.990 1.360 ..P WKT 2010 12 26 10 19 55 31.3200 -97.3300 251.000 30.0 163.630 5.090 -999.990 -999.990 1.636 ..P WKT 2010 12 26 10 24 55 31.3200 -97.3300 251.000 122.0 168.382 5.240 -999.990 -999.990 1.684 ..P WKT 2010 12 26 10 29 55 31.3200 -97.3300 251.000 457.0 137.853 5.560 -999.990 -999.990 1.379 ..P WKT 2010 12 26 10 34 55 31.3200 -97.3300 251.000 30.0 162.308 5.260 -999.990 -999.990 1.623 ..P WKT 2010 12 26 10 39 55 31.3200 -97.3300 251.000 122.0 163.066 6.170 -999.990 -999.990 1.631 ..P WKT 2010 12 26 10 44 55 31.3200 -97.3300 251.000 457.0 140.128 5.220 -999.990 -999.990 1.401 ..P WKT 2010 12 26 10 54 55 31.3200 -97.3300 251.000 30.0 168.095 5.300 -999.990 -999.990 1.681 ..P WKT 2010 12 26 10 59 55 31.3200 -97.3300 251.000 122.0 160.296 5.420 -999.990 -999.990 1.603 ..P WKT 2010 12 26 11 04 55 31.3200 -97.3300 251.000 457.0 134.129 5.400 -999.990 -999.990 1.341 ..P WKT 2010 12 26 11 09 55 31.3200 -97.3300 251.000 30.0 161.069 5.730 -999.990 -999.990 1.611 ..P WKT 2010 12 26 11 14 55 31.3200 -97.3300 251.000 122.0 173.234 5.840 -999.990 -999.990 1.732 ..P WKT 2010 12 26 11 19 55 31.3200 -97.3300 251.000 457.0 133.096 6.630 -999.990 -999.990 1.331 ..P WKT 2010 12 26 11 29 55 31.3200 -97.3300 251.000 30.0 159.282 5.950 -999.990 -999.990 1.593 ..P WKT 2010 12 26 11 34 55 31.3200 -97.3300 251.000 122.0 163.453 6.160 -999.990 -999.990 1.635 ..P WKT 2010 12 26 11 39 55 31.3200 -97.3300 251.000 457.0 133.694 5.580 -999.990 -999.990 1.337 ..P WKT 2010 12 26 11 44 55 31.3200 -97.3300 251.000 30.0 161.152 5.680 -999.990 -999.990 1.612 ..P WKT 2010 12 26 11 49 55 31.3200 -97.3300 251.000 122.0 156.143 5.490 -999.990 -999.990 1.561 ..P WKT 2010 12 26 12 09 55 31.3200 -97.3300 251.000 457.0 129.883 5.200 -999.990 -999.990 1.299 ..P WKT 2010 12 26 12 10 25 31.3200 -97.3300 251.000 457.0 132.508 5.360 -999.990 -999.990 1.325 ..P WKT 2010 12 26 12 10 55 31.3200 -97.3300 251.000 457.0 133.803 5.360 -999.990 -999.990 1.338 ..P WKT 2010 12 26 12 11 25 31.3200 -97.3300 251.000 457.0 137.226 5.600 -999.990 -999.990 1.372 ..P WKT 2010 12 26 12 11 55 31.3200 -97.3300 251.000 457.0 136.658 5.540 -999.990 -999.990 1.367 ..P WKT 2010 12 26 12 12 25 31.3200 -97.3300 251.000 457.0 132.630 5.680 -999.990 -999.990 1.326 ..P WKT 2010 12 26 12 12 55 31.3200 -97.3300 251.000 457.0 132.594 5.210 -999.990 -999.990 1.326 ..P WKT 2010 12 26 12 13 25 31.3200 -97.3300 251.000 457.0 128.566 5.190 -999.990 -999.990 1.286 ..P WKT 2010 12 26 12 13 55 31.3200 -97.3300 251.000 457.0 133.320 5.280 -999.990 -999.990 1.333 ..P WKT 2010 12 26 12 14 25 31.3200 -97.3300 251.000 457.0 137.542 5.800 -999.990 -999.990 1.375 ..P WKT 2010 12 26 12 14 55 31.3200 -97.3300 251.000 457.0 135.110 5.370 -999.990 -999.990 1.351 ..P WKT 2010 12 26 12 19 55 31.3200 -97.3300 251.000 30.0 159.236 5.230 -999.990 -999.990 1.592 ..P WKT 2010 12 26 12 24 55 31.3200 -97.3300 251.000 122.0 159.940 5.830 -999.990 -999.990 1.599 ..P WKT 2010 12 26 12 29 55 31.3200 -97.3300 251.000 457.0 131.630 5.260 -999.990 -999.990 1.316 ..P WKT 2010 12 26 12 34 55 31.3200 -97.3300 251.000 30.0 155.228 5.190 -999.990 -999.990 1.552 ..P WKT 2010 12 26 12 39 55 31.3200 -97.3300 251.000 122.0 159.127 5.140 -999.990 -999.990 1.591 ..P WKT 2010 12 26 12 44 55 31.3200 -97.3300 251.000 457.0 127.881 5.090 -999.990 -999.990 1.279 ..P WKT 2010 12 26 12 54 55 31.3200 -97.3300 251.000 30.0 156.188 6.330 -999.990 -999.990 1.562 ..P WKT 2010 12 26 12 59 55 31.3200 -97.3300 251.000 122.0 160.892 5.210 -999.990 -999.990 1.609 ..P WKT 2010 12 26 13 04 55 31.3200 -97.3300 251.000 457.0 136.299 5.960 -999.990 -999.990 1.363 ..P WKT 2010 12 26 13 09 55 31.3200 -97.3300 251.000 30.0 150.592 5.270 -999.990 -999.990 1.506 ..P WKT 2010 12 26 13 14 55 31.3200 -97.3300 251.000 122.0 155.563 4.950 -999.990 -999.990 1.556 ..P WKT 2010 12 26 13 19 55 31.3200 -97.3300 251.000 457.0 134.960 5.550 -999.990 -999.990 1.350 ..P WKT 2010 12 26 13 29 55 31.3200 -97.3300 251.000 30.0 155.998 5.450 -999.990 -999.990 1.560 ..P WKT 2010 12 26 13 34 55 31.3200 -97.3300 251.000 122.0 153.282 5.190 -999.990 -999.990 1.533 ..P WKT 2010 12 26 13 39 55 31.3200 -97.3300 251.000 457.0 135.774 5.150 -999.990 -999.990 1.358 ..P WKT 2010 12 26 13 44 55 31.3200 -97.3300 251.000 30.0 150.645 5.670 -999.990 -999.990 1.506 ..P WKT 2010 12 26 13 49 55 31.3200 -97.3300 251.000 122.0 155.525 5.770 -999.990 -999.990 1.555 ..P WKT 2010 12 26 13 54 55 31.3200 -97.3300 251.000 457.0 135.748 5.790 -999.990 -999.990 1.357 ..P WKT 2010 12 26 14 04 55 31.3200 -97.3300 251.000 30.0 150.933 5.590 -999.990 -999.990 1.509 ..P WKT 2010 12 26 14 09 55 31.3200 -97.3300 251.000 122.0 154.041 5.690 -999.990 -999.990 1.540 ..P WKT 2010 12 26 14 14 55 31.3200 -97.3300 251.000 457.0 123.022 5.550 -999.990 -999.990 1.230 ..P WKT 2010 12 26 14 19 55 31.3200 -97.3300 251.000 30.0 156.795 5.840 -999.990 -999.990 1.568 ..P WKT 2010 12 26 14 24 55 31.3200 -97.3300 251.000 122.0 151.105 5.440 -999.990 -999.990 1.511 ..P WKT 2010 12 26 14 29 55 31.3200 -97.3300 251.000 457.0 124.212 6.060 -999.990 -999.990 1.242 ..P WKT 2010 12 26 14 39 55 31.3200 -97.3300 251.000 30.0 151.483 5.200 -999.990 -999.990 1.515 ..P WKT 2010 12 26 14 44 55 31.3200 -97.3300 251.000 122.0 150.173 5.160 -999.990 -999.990 1.502 ..P WKT 2010 12 26 14 49 55 31.3200 -97.3300 251.000 457.0 125.386 4.940 -999.990 -999.990 1.254 ..P WKT 2010 12 26 14 54 55 31.3200 -97.3300 251.000 30.0 147.954 4.900 -999.990 -999.990 1.480 ..P WKT 2010 12 26 14 59 55 31.3200 -97.3300 251.000 122.0 151.446 4.930 -999.990 -999.990 1.514 ..P WKT 2010 12 26 15 04 55 31.3200 -97.3300 251.000 457.0 123.185 4.950 -999.990 -999.990 1.232 ..P WKT 2010 12 26 15 14 55 31.3200 -97.3300 251.000 30.0 149.727 5.270 -999.990 -999.990 1.497 ..P WKT 2010 12 26 15 19 55 31.3200 -97.3300 251.000 122.0 151.295 4.910 -999.990 -999.990 1.513 ..P WKT 2010 12 26 15 24 55 31.3200 -97.3300 251.000 457.0 126.971 5.210 -999.990 -999.990 1.270 ..P WKT 2010 12 26 15 29 55 31.3200 -97.3300 251.000 30.0 149.895 5.200 -999.990 -999.990 1.499 ..P WKT 2010 12 26 15 34 55 31.3200 -97.3300 251.000 122.0 152.664 4.910 -999.990 -999.990 1.527 ..P WKT 2010 12 26 15 39 55 31.3200 -97.3300 251.000 457.0 119.658 4.600 -999.990 -999.990 1.197 ..P WKT 2010 12 26 15 49 55 31.3200 -97.3300 251.000 30.0 146.710 5.720 -999.990 -999.990 1.467 ..P WKT 2010 12 26 15 54 55 31.3200 -97.3300 251.000 122.0 144.025 5.090 -999.990 -999.990 1.440 ..P WKT 2010 12 26 15 59 55 31.3200 -97.3300 251.000 457.0 122.377 6.300 -999.990 -999.990 1.224 ..P WKT 2010 12 26 16 04 55 31.3200 -97.3300 251.000 30.0 156.282 7.420 -999.990 -999.990 1.563 ..P WKT 2010 12 26 16 09 55 31.3200 -97.3300 251.000 122.0 150.392 6.990 -999.990 -999.990 1.504 ..P WKT 2010 12 26 16 14 55 31.3200 -97.3300 251.000 457.0 131.946 5.400 -999.990 -999.990 1.319 ..P WKT 2010 12 26 16 24 55 31.3200 -97.3300 251.000 30.0 150.159 5.170 -999.990 -999.990 1.502 ..P WKT 2010 12 26 16 29 55 31.3200 -97.3300 251.000 122.0 149.153 6.870 -999.990 -999.990 1.492 ..P WKT 2010 12 26 16 34 55 31.3200 -97.3300 251.000 457.0 127.036 7.760 -999.990 -999.990 1.270 ..P WKT 2010 12 26 16 39 55 31.3200 -97.3300 251.000 30.0 150.613 6.720 -999.990 -999.990 1.506 ..P WKT 2010 12 26 16 44 55 31.3200 -97.3300 251.000 122.0 145.598 6.830 -999.990 -999.990 1.456 ..P WKT 2010 12 26 16 49 55 31.3200 -97.3300 251.000 457.0 123.743 5.820 -999.990 -999.990 1.237 ..P WKT 2010 12 26 17 04 55 31.3200 -97.3300 251.000 30.0 139.553 5.850 -999.990 -999.990 1.396 ..P WKT 2010 12 26 17 09 55 31.3200 -97.3300 251.000 122.0 140.479 6.540 -999.990 -999.990 1.405 ..P WKT 2010 12 26 17 14 55 31.3200 -97.3300 251.000 457.0 134.721 7.810 -999.990 -999.990 1.347 ..P WKT 2010 12 26 17 19 55 31.3200 -97.3300 251.000 30.0 136.715 5.070 -999.990 -999.990 1.367 ..P WKT 2010 12 26 17 24 55 31.3200 -97.3300 251.000 122.0 140.315 4.530 -999.990 -999.990 1.403 ..P WKT 2010 12 26 17 29 55 31.3200 -97.3300 251.000 457.0 137.497 5.710 -999.990 -999.990 1.375 ..P WKT 2010 12 26 17 39 55 31.3200 -97.3300 251.000 30.0 140.414 4.710 -999.990 -999.990 1.404 ..P WKT 2010 12 26 17 44 55 31.3200 -97.3300 251.000 122.0 140.265 5.320 -999.990 -999.990 1.403 ..P WKT 2010 12 26 17 49 55 31.3200 -97.3300 251.000 457.0 138.244 5.200 -999.990 -999.990 1.382 ..P WKT 2010 12 26 17 54 55 31.3200 -97.3300 251.000 30.0 142.376 5.490 -999.990 -999.990 1.424 ..P WKT 2010 12 26 17 59 55 31.3200 -97.3300 251.000 122.0 137.545 5.170 -999.990 -999.990 1.375 ..P WKT 2010 12 26 18 04 55 31.3200 -97.3300 251.000 457.0 141.544 5.540 -999.990 -999.990 1.415 ..P WKT 2010 12 26 18 14 55 31.3200 -97.3300 251.000 30.0 135.397 5.640 -999.990 -999.990 1.354 ..P WKT 2010 12 26 18 19 55 31.3200 -97.3300 251.000 122.0 138.499 5.520 -999.990 -999.990 1.385 ..P WKT 2010 12 26 18 24 55 31.3200 -97.3300 251.000 457.0 134.908 5.430 -999.990 -999.990 1.349 ..P WKT 2010 12 26 18 29 55 31.3200 -97.3300 251.000 30.0 135.600 5.160 -999.990 -999.990 1.356 ..P WKT 2010 12 26 18 34 55 31.3200 -97.3300 251.000 122.0 138.970 5.010 -999.990 -999.990 1.390 ..P WKT 2010 12 26 18 39 55 31.3200 -97.3300 251.000 457.0 132.166 5.300 -999.990 -999.990 1.322 ..P WKT 2010 12 26 18 49 55 31.3200 -97.3300 251.000 30.0 145.161 4.810 -999.990 -999.990 1.452 ..P WKT 2010 12 26 18 54 55 31.3200 -97.3300 251.000 122.0 139.255 5.520 -999.990 -999.990 1.393 ..P WKT 2010 12 26 18 59 55 31.3200 -97.3300 251.000 457.0 132.544 4.530 -999.990 -999.990 1.325 ..P WKT 2010 12 26 19 04 55 31.3200 -97.3300 251.000 30.0 140.162 5.370 -999.990 -999.990 1.402 ..P WKT 2010 12 26 19 09 55 31.3200 -97.3300 251.000 122.0 138.406 5.130 -999.990 -999.990 1.384 ..P WKT 2010 12 26 19 14 55 31.3200 -97.3300 251.000 457.0 140.668 4.700 -999.990 -999.990 1.407 ..P WKT 2010 12 26 19 24 55 31.3200 -97.3300 251.000 30.0 145.882 4.740 -999.990 -999.990 1.459 ..P WKT 2010 12 26 19 29 55 31.3200 -97.3300 251.000 122.0 139.858 4.320 -999.990 -999.990 1.399 ..P WKT 2010 12 26 19 34 55 31.3200 -97.3300 251.000 457.0 144.418 7.240 -999.990 -999.990 1.444 ..P WKT 2010 12 26 19 39 55 31.3200 -97.3300 251.000 30.0 141.743 4.530 -999.990 -999.990 1.417 ..P WKT 2010 12 26 19 44 55 31.3200 -97.3300 251.000 122.0 142.283 4.580 -999.990 -999.990 1.423 ..P WKT 2010 12 26 19 49 55 31.3200 -97.3300 251.000 457.0 141.215 4.420 -999.990 -999.990 1.412 ..P WKT 2010 12 26 19 59 55 31.3200 -97.3300 251.000 30.0 137.376 4.380 -999.990 -999.990 1.374 ..P WKT 2010 12 26 20 04 55 31.3200 -97.3300 251.000 122.0 141.305 4.850 -999.990 -999.990 1.413 ..P WKT 2010 12 26 20 09 55 31.3200 -97.3300 251.000 457.0 135.047 4.050 -999.990 -999.990 1.350 ..P WKT 2010 12 26 20 14 55 31.3200 -97.3300 251.000 30.0 141.927 3.970 -999.990 -999.990 1.419 ..P WKT 2010 12 26 20 19 55 31.3200 -97.3300 251.000 122.0 139.690 3.940 -999.990 -999.990 1.397 ..P WKT 2010 12 26 20 24 55 31.3200 -97.3300 251.000 457.0 134.235 3.950 -999.990 -999.990 1.342 ..P WKT 2010 12 26 20 34 55 31.3200 -97.3300 251.000 30.0 137.002 3.950 -999.990 -999.990 1.370 ..P WKT 2010 12 26 20 39 55 31.3200 -97.3300 251.000 122.0 136.910 4.620 -999.990 -999.990 1.369 ..P WKT 2010 12 26 20 44 55 31.3200 -97.3300 251.000 457.0 131.989 5.050 -999.990 -999.990 1.320 ..P WKT 2010 12 26 20 49 55 31.3200 -97.3300 251.000 30.0 129.751 4.010 -999.990 -999.990 1.298 ..P WKT 2010 12 26 20 54 55 31.3200 -97.3300 251.000 122.0 137.707 4.140 -999.990 -999.990 1.377 ..P WKT 2010 12 26 20 59 55 31.3200 -97.3300 251.000 457.0 120.980 4.770 -999.990 -999.990 1.210 ..P WKT 2010 12 26 21 09 55 31.3200 -97.3300 251.000 30.0 130.838 4.510 -999.990 -999.990 1.308 ..P WKT 2010 12 26 21 14 55 31.3200 -97.3300 251.000 122.0 133.008 4.290 -999.990 -999.990 1.330 ..P WKT 2010 12 26 21 19 55 31.3200 -97.3300 251.000 457.0 136.521 4.800 -999.990 -999.990 1.365 ..P WKT 2010 12 26 21 24 55 31.3200 -97.3300 251.000 30.0 133.591 5.240 -999.990 -999.990 1.336 ..P WKT 2010 12 26 21 29 55 31.3200 -97.3300 251.000 122.0 135.896 4.750 -999.990 -999.990 1.359 ..P WKT 2010 12 26 21 34 55 31.3200 -97.3300 251.000 457.0 134.174 4.910 -999.990 -999.990 1.342 ..P WKT 2010 12 26 21 44 55 31.3200 -97.3300 251.000 30.0 136.541 5.280 -999.990 -999.990 1.365 ..P WKT 2010 12 26 21 49 55 31.3200 -97.3300 251.000 122.0 136.333 4.710 -999.990 -999.990 1.363 ..P WKT 2010 12 26 21 54 55 31.3200 -97.3300 251.000 457.0 134.918 4.390 -999.990 -999.990 1.349 ..P WKT 2010 12 26 21 59 55 31.3200 -97.3300 251.000 30.0 138.068 5.060 -999.990 -999.990 1.381 ..P WKT 2010 12 26 22 04 55 31.3200 -97.3300 251.000 122.0 134.638 4.650 -999.990 -999.990 1.346 ..P WKT 2010 12 26 22 09 55 31.3200 -97.3300 251.000 457.0 131.745 4.630 -999.990 -999.990 1.317 ..P WKT 2010 12 26 22 19 55 31.3200 -97.3300 251.000 30.0 132.980 4.260 -999.990 -999.990 1.330 ..P WKT 2010 12 26 22 24 55 31.3200 -97.3300 251.000 122.0 134.960 4.040 -999.990 -999.990 1.350 ..P WKT 2010 12 26 22 29 55 31.3200 -97.3300 251.000 457.0 132.508 4.850 -999.990 -999.990 1.325 ..P WKT 2010 12 26 22 34 55 31.3200 -97.3300 251.000 30.0 137.310 4.620 -999.990 -999.990 1.373 ..P WKT 2010 12 26 22 39 55 31.3200 -97.3300 251.000 122.0 137.141 4.780 -999.990 -999.990 1.371 ..P WKT 2010 12 26 22 44 55 31.3200 -97.3300 251.000 457.0 133.210 4.740 -999.990 -999.990 1.332 ..P WKT 2010 12 26 22 54 55 31.3200 -97.3300 251.000 30.0 134.427 4.880 -999.990 -999.990 1.344 ..P WKT 2010 12 26 22 59 55 31.3200 -97.3300 251.000 122.0 136.620 4.540 -999.990 -999.990 1.366 ..P WKT 2010 12 26 23 04 55 31.3200 -97.3300 251.000 457.0 138.276 4.510 -999.990 -999.990 1.383 ..P WKT 2010 12 26 23 09 55 31.3200 -97.3300 251.000 30.0 132.806 4.120 -999.990 -999.990 1.328 ..P WKT 2010 12 26 23 14 55 31.3200 -97.3300 251.000 122.0 141.452 4.040 -999.990 -999.990 1.415 ..P WKT 2010 12 26 23 19 55 31.3200 -97.3300 251.000 457.0 134.907 4.920 -999.990 -999.990 1.349 ..P WKT 2010 12 26 23 29 55 31.3200 -97.3300 251.000 30.0 140.150 3.770 -999.990 -999.990 1.402 ..P WKT 2010 12 26 23 34 55 31.3200 -97.3300 251.000 122.0 138.089 3.560 -999.990 -999.990 1.381 ..P WKT 2010 12 26 23 39 55 31.3200 -97.3300 251.000 457.0 141.945 4.830 -999.990 -999.990 1.419 ..P WKT 2010 12 26 23 44 55 31.3200 -97.3300 251.000 30.0 142.574 3.870 -999.990 -999.990 1.426 ..P WKT 2010 12 26 23 49 55 31.3200 -97.3300 251.000 122.0 142.934 4.300 -999.990 -999.990 1.429 ..P WKT 2010 12 27 00 09 55 31.3200 -97.3300 251.000 457.0 138.597 4.010 -999.990 -999.990 1.386 ..P WKT 2010 12 27 00 10 25 31.3200 -97.3300 251.000 457.0 129.179 4.320 -999.990 -999.990 1.292 ..P WKT 2010 12 27 00 10 55 31.3200 -97.3300 251.000 457.0 132.409 3.790 -999.990 -999.990 1.324 ..P WKT 2010 12 27 00 11 25 31.3200 -97.3300 251.000 457.0 131.602 3.840 -999.990 -999.990 1.316 ..P WKT 2010 12 27 00 11 55 31.3200 -97.3300 251.000 457.0 128.372 3.590 -999.990 -999.990 1.284 ..P WKT 2010 12 27 00 12 25 31.3200 -97.3300 251.000 457.0 130.525 3.670 -999.990 -999.990 1.305 ..P WKT 2010 12 27 00 12 55 31.3200 -97.3300 251.000 457.0 129.180 3.640 -999.990 -999.990 1.292 ..P WKT 2010 12 27 00 13 25 31.3200 -97.3300 251.000 457.0 128.642 4.100 -999.990 -999.990 1.286 ..P WKT 2010 12 27 00 13 55 31.3200 -97.3300 251.000 457.0 130.257 3.710 -999.990 -999.990 1.303 ..P WKT 2010 12 27 00 14 25 31.3200 -97.3300 251.000 457.0 133.218 3.820 -999.990 -999.990 1.332 ..P WKT 2010 12 27 00 14 55 31.3200 -97.3300 251.000 457.0 131.603 3.970 -999.990 -999.990 1.316 ..P WKT 2010 12 27 00 19 55 31.3200 -97.3300 251.000 30.0 141.295 3.790 -999.990 -999.990 1.413 ..P WKT 2010 12 27 00 24 55 31.3200 -97.3300 251.000 122.0 139.683 4.010 -999.990 -999.990 1.397 ..P WKT 2010 12 27 00 29 55 31.3200 -97.3300 251.000 457.0 129.995 4.020 -999.990 -999.990 1.300 ..P WKT 2010 12 27 00 34 55 31.3200 -97.3300 251.000 30.0 138.343 4.230 -999.990 -999.990 1.383 ..P WKT 2010 12 27 00 39 55 31.3200 -97.3300 251.000 122.0 145.615 4.870 -999.990 -999.990 1.456 ..P WKT 2010 12 27 00 44 55 31.3200 -97.3300 251.000 457.0 124.616 3.860 -999.990 -999.990 1.246 ..P WKT 2010 12 27 00 54 55 31.3200 -97.3300 251.000 30.0 143.991 4.480 -999.990 -999.990 1.440 ..P WKT 2010 12 27 00 59 55 31.3200 -97.3300 251.000 122.0 150.169 3.970 -999.990 -999.990 1.502 ..P WKT 2010 12 27 01 04 55 31.3200 -97.3300 251.000 457.0 140.187 4.110 -999.990 -999.990 1.402 ..P WKT 2010 12 27 01 09 55 31.3200 -97.3300 251.000 30.0 173.573 5.240 -999.990 -999.990 1.736 ..P WKT 2010 12 27 01 14 55 31.3200 -97.3300 251.000 122.0 166.286 4.120 -999.990 -999.990 1.663 ..P WKT 2010 12 27 01 19 55 31.3200 -97.3300 251.000 457.0 131.383 4.740 -999.990 -999.990 1.314 ..P WKT 2010 12 27 01 29 55 31.3200 -97.3300 251.000 30.0 143.590 4.600 -999.990 -999.990 1.436 ..P WKT 2010 12 27 01 34 55 31.3200 -97.3300 251.000 122.0 150.696 4.630 -999.990 -999.990 1.507 ..P WKT 2010 12 27 01 39 55 31.3200 -97.3300 251.000 457.0 135.838 4.560 -999.990 -999.990 1.358 ..P WKT 2010 12 27 01 44 55 31.3200 -97.3300 251.000 30.0 143.754 4.040 -999.990 -999.990 1.438 ..P WKT 2010 12 27 01 49 55 31.3200 -97.3300 251.000 122.0 153.287 4.450 -999.990 -999.990 1.533 ..P WKT 2010 12 27 01 54 55 31.3200 -97.3300 251.000 457.0 138.022 4.500 -999.990 -999.990 1.380 ..P WKT 2010 12 27 02 04 55 31.3200 -97.3300 251.000 30.0 137.547 3.830 -999.990 -999.990 1.375 ..P WKT 2010 12 27 02 09 55 31.3200 -97.3300 251.000 122.0 151.262 4.580 -999.990 -999.990 1.513 ..P WKT 2010 12 27 02 14 55 31.3200 -97.3300 251.000 457.0 116.577 5.360 -999.990 -999.990 1.166 ..P WKT 2010 12 27 02 19 55 31.3200 -97.3300 251.000 30.0 128.270 5.940 -999.990 -999.990 1.283 ..P WKT 2010 12 27 02 24 55 31.3200 -97.3300 251.000 122.0 139.696 6.260 -999.990 -999.990 1.397 ..P WKT 2010 12 27 02 29 55 31.3200 -97.3300 251.000 457.0 105.541 4.450 -999.990 -999.990 1.055 ..P WKT 2010 12 27 02 39 55 31.3200 -97.3300 251.000 30.0 130.495 4.370 -999.990 -999.990 1.305 ..P WKT 2010 12 27 02 44 55 31.3200 -97.3300 251.000 122.0 130.670 5.320 -999.990 -999.990 1.307 ..P WKT 2010 12 27 02 49 55 31.3200 -97.3300 251.000 457.0 104.810 5.990 -999.990 -999.990 1.048 ..P WKT 2010 12 27 02 54 55 31.3200 -97.3300 251.000 30.0 137.902 5.680 -999.990 -999.990 1.379 ..P WKT 2010 12 27 02 59 55 31.3200 -97.3300 251.000 122.0 136.054 4.550 -999.990 -999.990 1.361 ..P WKT 2010 12 27 03 04 55 31.3200 -97.3300 251.000 457.0 105.736 4.510 -999.990 -999.990 1.057 ..P WKT 2010 12 27 03 14 55 31.3200 -97.3300 251.000 30.0 142.290 4.350 -999.990 -999.990 1.423 ..P WKT 2010 12 27 03 19 55 31.3200 -97.3300 251.000 122.0 131.842 4.430 -999.990 -999.990 1.318 ..P WKT 2010 12 27 03 24 55 31.3200 -97.3300 251.000 457.0 110.056 4.820 -999.990 -999.990 1.101 ..P WKT 2010 12 27 03 29 55 31.3200 -97.3300 251.000 30.0 138.346 4.180 -999.990 -999.990 1.383 ..P WKT 2010 12 27 03 34 55 31.3200 -97.3300 251.000 122.0 135.321 5.410 -999.990 -999.990 1.353 ..P WKT 2010 12 27 03 39 55 31.3200 -97.3300 251.000 457.0 115.555 4.270 -999.990 -999.990 1.156 ..P WKT 2010 12 27 03 49 55 31.3200 -97.3300 251.000 30.0 137.605 4.110 -999.990 -999.990 1.376 ..P WKT 2010 12 27 03 54 55 31.3200 -97.3300 251.000 122.0 143.511 5.040 -999.990 -999.990 1.435 ..P WKT 2010 12 27 03 59 55 31.3200 -97.3300 251.000 457.0 115.925 4.070 -999.990 -999.990 1.159 ..P WKT 2010 12 27 04 04 55 31.3200 -97.3300 251.000 30.0 142.360 4.910 -999.990 -999.990 1.424 ..P WKT 2010 12 27 04 09 55 31.3200 -97.3300 251.000 122.0 136.922 4.410 -999.990 -999.990 1.369 ..P WKT 2010 12 27 04 14 55 31.3200 -97.3300 251.000 457.0 108.519 4.260 -999.990 -999.990 1.085 ..P WKT 2010 12 27 04 24 55 31.3200 -97.3300 251.000 30.0 136.042 4.380 -999.990 -999.990 1.360 ..P WKT 2010 12 27 04 29 55 31.3200 -97.3300 251.000 122.0 133.342 4.430 -999.990 -999.990 1.333 ..P WKT 2010 12 27 04 34 55 31.3200 -97.3300 251.000 457.0 111.995 4.560 -999.990 -999.990 1.120 ..P WKT 2010 12 27 04 39 55 31.3200 -97.3300 251.000 30.0 138.482 4.300 -999.990 -999.990 1.385 ..P WKT 2010 12 27 04 44 55 31.3200 -97.3300 251.000 122.0 135.782 4.250 -999.990 -999.990 1.358 ..P WKT 2010 12 27 04 49 55 31.3200 -97.3300 251.000 457.0 116.593 4.200 -999.990 -999.990 1.166 ..P WKT 2010 12 27 05 04 55 31.3200 -97.3300 251.000 30.0 148.196 5.320 -999.990 -999.990 1.482 ..P WKT 2010 12 27 05 09 55 31.3200 -97.3300 251.000 122.0 131.554 4.270 -999.990 -999.990 1.316 ..P WKT 2010 12 27 05 14 55 31.3200 -97.3300 251.000 457.0 114.097 4.220 -999.990 -999.990 1.141 ..P WKT 2010 12 27 05 19 55 31.3200 -97.3300 251.000 30.0 146.128 4.410 -999.990 -999.990 1.461 ..P WKT 2010 12 27 05 24 55 31.3200 -97.3300 251.000 122.0 136.108 4.470 -999.990 -999.990 1.361 ..P WKT 2010 12 27 05 29 55 31.3200 -97.3300 251.000 457.0 118.106 3.940 -999.990 -999.990 1.181 ..P WKT 2010 12 27 05 39 55 31.3200 -97.3300 251.000 30.0 150.420 5.360 -999.990 -999.990 1.504 ..P WKT 2010 12 27 05 44 55 31.3200 -97.3300 251.000 122.0 140.414 4.460 -999.990 -999.990 1.404 ..P WKT 2010 12 27 05 49 55 31.3200 -97.3300 251.000 457.0 116.065 5.190 -999.990 -999.990 1.161 ..P WKT 2010 12 27 05 54 55 31.3200 -97.3300 251.000 30.0 145.290 4.750 -999.990 -999.990 1.453 ..P WKT 2010 12 27 05 59 55 31.3200 -97.3300 251.000 122.0 140.557 5.000 -999.990 -999.990 1.406 ..P WKT 2010 12 27 06 04 55 31.3200 -97.3300 251.000 457.0 114.309 6.190 -999.990 -999.990 1.143 ..P WKT 2010 12 27 06 14 55 31.3200 -97.3300 251.000 30.0 141.978 5.290 -999.990 -999.990 1.420 ..P WKT 2010 12 27 06 19 55 31.3200 -97.3300 251.000 122.0 139.874 6.030 -999.990 -999.990 1.399 ..P WKT 2010 12 27 06 24 55 31.3200 -97.3300 251.000 457.0 103.252 4.710 -999.990 -999.990 1.033 ..P WKT 2010 12 27 06 29 55 31.3200 -97.3300 251.000 30.0 142.704 4.880 -999.990 -999.990 1.427 ..P WKT 2010 12 27 06 34 55 31.3200 -97.3300 251.000 122.0 140.599 4.630 -999.990 -999.990 1.406 ..P WKT 2010 12 27 06 39 55 31.3200 -97.3300 251.000 457.0 111.686 5.330 -999.990 -999.990 1.117 ..P WKT 2010 12 27 06 49 55 31.3200 -97.3300 251.000 30.0 133.837 4.810 -999.990 -999.990 1.338 ..P WKT 2010 12 27 06 54 55 31.3200 -97.3300 251.000 122.0 143.203 4.340 -999.990 -999.990 1.432 ..P WKT 2010 12 27 06 59 55 31.3200 -97.3300 251.000 457.0 116.410 4.620 -999.990 -999.990 1.164 ..P WKT 2010 12 27 07 04 55 31.3200 -97.3300 251.000 30.0 138.914 5.380 -999.990 -999.990 1.389 ..P WKT 2010 12 27 07 09 55 31.3200 -97.3300 251.000 122.0 143.407 5.100 -999.990 -999.990 1.434 ..P WKT 2010 12 27 07 14 55 31.3200 -97.3300 251.000 457.0 156.975 7.080 -999.990 -999.990 1.570 ..P WKT 2010 12 27 07 24 55 31.3200 -97.3300 251.000 30.0 145.042 4.350 -999.990 -999.990 1.450 ..P WKT 2010 12 27 07 29 55 31.3200 -97.3300 251.000 122.0 145.819 5.660 -999.990 -999.990 1.458 ..P WKT 2010 12 27 07 34 55 31.3200 -97.3300 251.000 457.0 109.738 5.580 -999.990 -999.990 1.097 ..P WKT 2010 12 27 07 39 55 31.3200 -97.3300 251.000 30.0 140.600 5.340 -999.990 -999.990 1.406 ..P WKT 2010 12 27 07 44 55 31.3200 -97.3300 251.000 122.0 139.208 5.040 -999.990 -999.990 1.392 ..P WKT 2010 12 27 07 49 55 31.3200 -97.3300 251.000 457.0 115.859 4.540 -999.990 -999.990 1.159 ..P WKT 2010 12 27 07 59 55 31.3200 -97.3300 251.000 30.0 135.732 4.540 -999.990 -999.990 1.357 ..P WKT 2010 12 27 08 04 55 31.3200 -97.3300 251.000 122.0 139.918 4.640 -999.990 -999.990 1.399 ..P WKT 2010 12 27 08 09 55 31.3200 -97.3300 251.000 457.0 112.378 5.130 -999.990 -999.990 1.124 ..P WKT 2010 12 27 08 14 55 31.3200 -97.3300 251.000 30.0 136.902 4.580 -999.990 -999.990 1.369 ..P WKT 2010 12 27 08 19 55 31.3200 -97.3300 251.000 122.0 133.767 4.590 -999.990 -999.990 1.338 ..P WKT 2010 12 27 08 24 55 31.3200 -97.3300 251.000 457.0 125.748 4.140 -999.990 -999.990 1.257 ..P WKT 2010 12 27 08 34 55 31.3200 -97.3300 251.000 30.0 138.889 4.320 -999.990 -999.990 1.389 ..P WKT 2010 12 27 08 39 55 31.3200 -97.3300 251.000 122.0 135.366 4.220 -999.990 -999.990 1.354 ..P WKT 2010 12 27 08 44 55 31.3200 -97.3300 251.000 457.0 144.864 4.370 -999.990 -999.990 1.449 ..P WKT 2010 12 27 08 49 55 31.3200 -97.3300 251.000 30.0 134.827 4.630 -999.990 -999.990 1.348 ..P WKT 2010 12 27 08 54 55 31.3200 -97.3300 251.000 122.0 149.755 4.530 -999.990 -999.990 1.498 ..P WKT 2010 12 27 08 59 55 31.3200 -97.3300 251.000 457.0 140.803 4.290 -999.990 -999.990 1.408 ..P WKT 2010 12 27 09 09 55 31.3200 -97.3300 251.000 30.0 133.035 4.270 -999.990 -999.990 1.330 ..P WKT 2010 12 27 09 14 55 31.3200 -97.3300 251.000 122.0 147.250 5.180 -999.990 -999.990 1.472 ..P WKT 2010 12 27 09 19 55 31.3200 -97.3300 251.000 457.0 134.319 4.790 -999.990 -999.990 1.343 ..P WKT 2010 12 27 09 24 55 31.3200 -97.3300 251.000 30.0 133.062 5.020 -999.990 -999.990 1.331 ..P WKT 2010 12 27 09 29 55 31.3200 -97.3300 251.000 122.0 144.972 4.950 -999.990 -999.990 1.450 ..P WKT 2010 12 27 09 34 55 31.3200 -97.3300 251.000 457.0 125.522 4.560 -999.990 -999.990 1.255 ..P WKT 2010 12 27 09 44 55 31.3200 -97.3300 251.000 30.0 134.061 5.410 -999.990 -999.990 1.341 ..P WKT 2010 12 27 09 49 55 31.3200 -97.3300 251.000 122.0 139.243 4.730 -999.990 -999.990 1.392 ..P WKT 2010 12 27 09 54 55 31.3200 -97.3300 251.000 457.0 136.141 5.730 -999.990 -999.990 1.361 ..P WKT 2010 12 27 09 59 55 31.3200 -97.3300 251.000 30.0 129.372 5.100 -999.990 -999.990 1.294 ..P WKT 2010 12 27 10 04 55 31.3200 -97.3300 251.000 122.0 141.891 5.080 -999.990 -999.990 1.419 ..P WKT 2010 12 27 10 09 55 31.3200 -97.3300 251.000 457.0 134.442 5.360 -999.990 -999.990 1.344 ..P WKT 2010 12 27 10 19 55 31.3200 -97.3300 251.000 30.0 131.749 5.460 -999.990 -999.990 1.317 ..P WKT 2010 12 27 10 24 55 31.3200 -97.3300 251.000 122.0 143.845 5.220 -999.990 -999.990 1.438 ..P WKT 2010 12 27 10 29 55 31.3200 -97.3300 251.000 457.0 126.455 4.830 -999.990 -999.990 1.265 ..P WKT 2010 12 27 10 34 55 31.3200 -97.3300 251.000 30.0 132.436 4.790 -999.990 -999.990 1.324 ..P WKT 2010 12 27 10 39 55 31.3200 -97.3300 251.000 122.0 136.515 5.030 -999.990 -999.990 1.365 ..P WKT 2010 12 27 10 44 55 31.3200 -97.3300 251.000 457.0 133.120 4.730 -999.990 -999.990 1.331 ..P WKT 2010 12 27 10 54 55 31.3200 -97.3300 251.000 30.0 132.465 4.750 -999.990 -999.990 1.325 ..P WKT 2010 12 27 10 59 55 31.3200 -97.3300 251.000 122.0 141.596 4.730 -999.990 -999.990 1.416 ..P WKT 2010 12 27 11 04 55 31.3200 -97.3300 251.000 457.0 138.763 5.510 -999.990 -999.990 1.388 ..P WKT 2010 12 27 11 09 55 31.3200 -97.3300 251.000 30.0 139.873 5.640 -999.990 -999.990 1.399 ..P WKT 2010 12 27 11 14 55 31.3200 -97.3300 251.000 122.0 145.743 4.900 -999.990 -999.990 1.457 ..P WKT 2010 12 27 11 19 55 31.3200 -97.3300 251.000 457.0 142.366 4.770 -999.990 -999.990 1.424 ..P WKT 2010 12 27 11 29 55 31.3200 -97.3300 251.000 30.0 147.424 4.440 -999.990 -999.990 1.474 ..P WKT 2010 12 27 11 34 55 31.3200 -97.3300 251.000 122.0 146.884 6.470 -999.990 -999.990 1.469 ..P WKT 2010 12 27 11 39 55 31.3200 -97.3300 251.000 457.0 142.262 5.020 -999.990 -999.990 1.423 ..P WKT 2010 12 27 11 44 55 31.3200 -97.3300 251.000 30.0 148.251 4.950 -999.990 -999.990 1.483 ..P WKT 2010 12 27 11 49 55 31.3200 -97.3300 251.000 122.0 152.882 4.900 -999.990 -999.990 1.529 ..P WKT 2010 12 27 12 09 55 31.3200 -97.3300 251.000 457.0 143.003 5.840 -999.990 -999.990 1.430 ..P WKT 2010 12 27 12 10 25 31.3200 -97.3300 251.000 457.0 144.116 5.360 -999.990 -999.990 1.441 ..P WKT 2010 12 27 12 10 55 31.3200 -97.3300 251.000 457.0 141.418 6.140 -999.990 -999.990 1.414 ..P WKT 2010 12 27 12 11 25 31.3200 -97.3300 251.000 457.0 137.361 6.170 -999.990 -999.990 1.374 ..P WKT 2010 12 27 12 11 55 31.3200 -97.3300 251.000 457.0 142.281 5.580 -999.990 -999.990 1.423 ..P WKT 2010 12 27 12 12 25 31.3200 -97.3300 251.000 457.0 140.945 5.490 -999.990 -999.990 1.409 ..P WKT 2010 12 27 12 12 55 31.3200 -97.3300 251.000 457.0 143.688 5.310 -999.990 -999.990 1.437 ..P WKT 2010 12 27 12 13 25 31.3200 -97.3300 251.000 457.0 144.799 5.640 -999.990 -999.990 1.448 ..P WKT 2010 12 27 12 13 55 31.3200 -97.3300 251.000 457.0 140.199 5.380 -999.990 -999.990 1.402 ..P WKT 2010 12 27 12 14 25 31.3200 -97.3300 251.000 457.0 138.862 5.550 -999.990 -999.990 1.389 ..P WKT 2010 12 27 12 14 55 31.3200 -97.3300 251.000 457.0 135.893 5.430 -999.990 -999.990 1.359 ..P WKT 2010 12 27 12 19 55 31.3200 -97.3300 251.000 30.0 151.358 5.470 -999.990 -999.990 1.514 ..P WKT 2010 12 27 12 24 55 31.3200 -97.3300 251.000 122.0 143.433 5.490 -999.990 -999.990 1.434 ..P WKT 2010 12 27 12 29 55 31.3200 -97.3300 251.000 457.0 139.318 5.700 -999.990 -999.990 1.393 ..P WKT 2010 12 27 12 34 55 31.3200 -97.3300 251.000 30.0 153.414 5.460 -999.990 -999.990 1.534 ..P WKT 2010 12 27 12 39 55 31.3200 -97.3300 251.000 122.0 141.145 5.680 -999.990 -999.990 1.411 ..P WKT 2010 12 27 12 44 55 31.3200 -97.3300 251.000 457.0 149.259 5.590 -999.990 -999.990 1.493 ..P WKT 2010 12 27 12 54 55 31.3200 -97.3300 251.000 30.0 160.103 5.530 -999.990 -999.990 1.601 ..P WKT 2010 12 27 12 59 55 31.3200 -97.3300 251.000 122.0 124.003 5.540 -999.990 -999.990 1.240 ..P WKT 2010 12 27 13 04 55 31.3200 -97.3300 251.000 457.0 144.118 5.300 -999.990 -999.990 1.441 ..P WKT 2010 12 27 13 09 55 31.3200 -97.3300 251.000 30.0 165.582 5.560 -999.990 -999.990 1.656 ..P WKT 2010 12 27 13 14 55 31.3200 -97.3300 251.000 122.0 129.910 5.140 -999.990 -999.990 1.299 ..P WKT 2010 12 27 13 19 55 31.3200 -97.3300 251.000 457.0 151.911 5.040 -999.990 -999.990 1.519 ..P WKT 2010 12 27 13 29 55 31.3200 -97.3300 251.000 30.0 165.724 5.880 -999.990 -999.990 1.657 ..P WKT 2010 12 27 13 34 55 31.3200 -97.3300 251.000 122.0 130.426 5.110 -999.990 -999.990 1.304 ..P WKT 2010 12 27 13 39 55 31.3200 -97.3300 251.000 457.0 145.574 6.330 -999.990 -999.990 1.456 ..P WKT 2010 12 27 13 44 55 31.3200 -97.3300 251.000 30.0 170.070 5.370 -999.990 -999.990 1.701 ..P WKT 2010 12 27 13 49 55 31.3200 -97.3300 251.000 122.0 130.183 5.870 -999.990 -999.990 1.302 ..P WKT 2010 12 27 13 54 55 31.3200 -97.3300 251.000 457.0 140.987 5.480 -999.990 -999.990 1.410 ..P WKT 2010 12 27 14 04 55 31.3200 -97.3300 251.000 30.0 171.814 5.700 -999.990 -999.990 1.718 ..P WKT 2010 12 27 14 09 55 31.3200 -97.3300 251.000 122.0 125.205 5.790 -999.990 -999.990 1.252 ..P WKT 2010 12 27 14 14 55 31.3200 -97.3300 251.000 457.0 136.157 5.150 -999.990 -999.990 1.362 ..P WKT 2010 12 27 14 19 55 31.3200 -97.3300 251.000 30.0 158.205 5.480 -999.990 -999.990 1.582 ..P WKT 2010 12 27 14 24 55 31.3200 -97.3300 251.000 122.0 129.761 5.740 -999.990 -999.990 1.298 ..P WKT 2010 12 27 14 29 55 31.3200 -97.3300 251.000 457.0 135.564 4.840 -999.990 -999.990 1.356 ..P WKT 2010 12 27 14 39 55 31.3200 -97.3300 251.000 30.0 149.984 5.990 -999.990 -999.990 1.500 ..P WKT 2010 12 27 14 44 55 31.3200 -97.3300 251.000 122.0 123.437 5.170 -999.990 -999.990 1.234 ..P WKT 2010 12 27 14 49 55 31.3200 -97.3300 251.000 457.0 145.714 6.700 -999.990 -999.990 1.457 ..P WKT 2010 12 27 14 54 55 31.3200 -97.3300 251.000 30.0 160.817 6.040 -999.990 -999.990 1.608 ..P WKT 2010 12 27 14 59 55 31.3200 -97.3300 251.000 122.0 140.501 6.230 -999.990 -999.990 1.405 ..P WKT 2010 12 27 15 04 55 31.3200 -97.3300 251.000 457.0 146.951 6.030 -999.990 -999.990 1.470 ..P WKT 2010 12 27 15 14 55 31.3200 -97.3300 251.000 30.0 154.226 7.610 -999.990 -999.990 1.542 ..P WKT 2010 12 27 15 19 55 31.3200 -97.3300 251.000 122.0 150.598 5.820 -999.990 -999.990 1.506 ..P WKT 2010 12 27 15 24 55 31.3200 -97.3300 251.000 457.0 141.298 5.310 -999.990 -999.990 1.413 ..P WKT 2010 12 27 15 29 55 31.3200 -97.3300 251.000 30.0 153.875 5.350 -999.990 -999.990 1.539 ..P WKT 2010 12 27 15 34 55 31.3200 -97.3300 251.000 122.0 155.918 5.150 -999.990 -999.990 1.559 ..P WKT 2010 12 27 15 39 55 31.3200 -97.3300 251.000 457.0 142.574 5.580 -999.990 -999.990 1.426 ..P WKT 2010 12 27 15 49 55 31.3200 -97.3300 251.000 30.0 155.374 5.250 -999.990 -999.990 1.554 ..P WKT 2010 12 27 15 54 55 31.3200 -97.3300 251.000 122.0 153.176 5.090 -999.990 -999.990 1.532 ..P WKT 2010 12 27 15 59 55 31.3200 -97.3300 251.000 457.0 142.886 4.980 -999.990 -999.990 1.429 ..P WKT 2010 12 27 16 04 55 31.3200 -97.3300 251.000 30.0 165.771 5.180 -999.990 -999.990 1.658 ..P WKT 2010 12 27 16 09 55 31.3200 -97.3300 251.000 122.0 165.730 5.430 -999.990 -999.990 1.657 ..P WKT 2010 12 27 16 14 55 31.3200 -97.3300 251.000 457.0 136.573 5.380 -999.990 -999.990 1.366 ..P WKT 2010 12 27 16 24 55 31.3200 -97.3300 251.000 30.0 165.219 5.330 -999.990 -999.990 1.652 ..P WKT 2010 12 27 16 29 55 31.3200 -97.3300 251.000 122.0 165.331 5.470 -999.990 -999.990 1.653 ..P WKT 2010 12 27 16 34 55 31.3200 -97.3300 251.000 457.0 123.420 6.400 -999.990 -999.990 1.234 ..P WKT 2010 12 27 16 39 55 31.3200 -97.3300 251.000 30.0 165.825 5.900 -999.990 -999.990 1.658 ..P WKT 2010 12 27 16 44 55 31.3200 -97.3300 251.000 122.0 169.437 6.310 -999.990 -999.990 1.694 ..P WKT 2010 12 27 16 49 55 31.3200 -97.3300 251.000 457.0 118.126 6.860 -999.990 -999.990 1.181 ..P WKT 2010 12 27 17 04 55 31.3200 -97.3300 251.000 30.0 161.972 6.850 -999.990 -999.990 1.620 ..P WKT 2010 12 27 17 09 55 31.3200 -97.3300 251.000 122.0 163.243 6.860 -999.990 -999.990 1.632 ..P WKT 2010 12 27 17 14 55 31.3200 -97.3300 251.000 457.0 108.970 6.080 -999.990 -999.990 1.090 ..P WKT 2010 12 27 17 19 55 31.3200 -97.3300 251.000 30.0 155.294 6.070 -999.990 -999.990 1.553 ..P WKT 2010 12 27 17 24 55 31.3200 -97.3300 251.000 122.0 163.287 5.970 -999.990 -999.990 1.633 ..P WKT 2010 12 27 17 29 55 31.3200 -97.3300 251.000 457.0 115.227 6.010 -999.990 -999.990 1.152 ..P WKT 2010 12 27 17 39 55 31.3200 -97.3300 251.000 30.0 156.742 5.690 -999.990 -999.990 1.567 ..P WKT 2010 12 27 17 44 55 31.3200 -97.3300 251.000 122.0 168.486 6.470 -999.990 -999.990 1.685 ..P WKT 2010 12 27 17 49 55 31.3200 -97.3300 251.000 457.0 126.500 6.270 -999.990 -999.990 1.265 ..P WKT 2010 12 27 17 54 55 31.3200 -97.3300 251.000 30.0 163.490 5.540 -999.990 -999.990 1.635 ..P WKT 2010 12 27 17 59 55 31.3200 -97.3300 251.000 122.0 160.188 6.310 -999.990 -999.990 1.602 ..P WKT 2010 12 27 18 04 55 31.3200 -97.3300 251.000 457.0 143.463 5.700 -999.990 -999.990 1.435 ..P WKT 2010 12 27 18 14 55 31.3200 -97.3300 251.000 30.0 152.302 5.710 -999.990 -999.990 1.523 ..P WKT 2010 12 27 18 19 55 31.3200 -97.3300 251.000 122.0 150.883 5.530 -999.990 -999.990 1.509 ..P WKT 2010 12 27 18 24 55 31.3200 -97.3300 251.000 457.0 156.037 5.580 -999.990 -999.990 1.560 ..P WKT 2010 12 27 18 29 55 31.3200 -97.3300 251.000 30.0 146.973 5.900 -999.990 -999.990 1.470 ..P WKT 2010 12 27 18 34 55 31.3200 -97.3300 251.000 122.0 146.226 6.050 -999.990 -999.990 1.462 ..P WKT 2010 12 27 18 39 55 31.3200 -97.3300 251.000 457.0 140.117 6.520 -999.990 -999.990 1.401 ..P WKT 2010 12 27 18 49 55 31.3200 -97.3300 251.000 30.0 149.787 6.130 -999.990 -999.990 1.498 ..P WKT 2010 12 27 18 54 55 31.3200 -97.3300 251.000 122.0 151.893 5.940 -999.990 -999.990 1.519 ..P WKT 2010 12 27 18 59 55 31.3200 -97.3300 251.000 457.0 147.701 6.110 -999.990 -999.990 1.477 ..P WKT 2010 12 27 19 04 55 31.3200 -97.3300 251.000 30.0 153.020 6.170 -999.990 -999.990 1.530 ..P WKT 2010 12 27 19 09 55 31.3200 -97.3300 251.000 122.0 145.481 5.780 -999.990 -999.990 1.455 ..P WKT 2010 12 27 19 14 55 31.3200 -97.3300 251.000 457.0 134.465 5.310 -999.990 -999.990 1.345 ..P WKT 2010 12 27 19 24 55 31.3200 -97.3300 251.000 30.0 143.264 5.440 -999.990 -999.990 1.433 ..P WKT 2010 12 27 19 29 55 31.3200 -97.3300 251.000 122.0 149.956 5.360 -999.990 -999.990 1.500 ..P WKT 2010 12 27 19 34 55 31.3200 -97.3300 251.000 457.0 147.547 5.460 -999.990 -999.990 1.475 ..P WKT 2010 12 27 19 39 55 31.3200 -97.3300 251.000 30.0 145.942 5.880 -999.990 -999.990 1.459 ..P WKT 2010 12 27 19 44 55 31.3200 -97.3300 251.000 122.0 149.152 5.520 -999.990 -999.990 1.492 ..P WKT 2010 12 27 19 49 55 31.3200 -97.3300 251.000 457.0 149.419 6.480 -999.990 -999.990 1.494 ..P WKT 2010 12 27 19 59 55 31.3200 -97.3300 251.000 30.0 147.814 5.770 -999.990 -999.990 1.478 ..P WKT 2010 12 27 20 04 55 31.3200 -97.3300 251.000 122.0 151.289 5.970 -999.990 -999.990 1.513 ..P WKT 2010 12 27 20 09 55 31.3200 -97.3300 251.000 457.0 148.616 6.930 -999.990 -999.990 1.486 ..P WKT 2010 12 27 20 14 55 31.3200 -97.3300 251.000 30.0 144.875 6.510 -999.990 -999.990 1.449 ..P WKT 2010 12 27 20 19 55 31.3200 -97.3300 251.000 122.0 146.211 6.410 -999.990 -999.990 1.462 ..P WKT 2010 12 27 20 24 55 31.3200 -97.3300 251.000 457.0 148.348 7.030 -999.990 -999.990 1.483 ..P WKT 2010 12 27 20 34 55 31.3200 -97.3300 251.000 30.0 148.500 7.400 -999.990 -999.990 1.485 ..P WKT 2010 12 27 20 39 55 31.3200 -97.3300 251.000 122.0 144.649 6.750 -999.990 -999.990 1.446 ..P WKT 2010 12 27 20 44 55 31.3200 -97.3300 251.000 457.0 139.464 6.890 -999.990 -999.990 1.395 ..P WKT 2010 12 27 20 49 55 31.3200 -97.3300 251.000 30.0 150.558 6.870 -999.990 -999.990 1.506 ..P WKT 2010 12 27 20 54 55 31.3200 -97.3300 251.000 122.0 147.775 6.800 -999.990 -999.990 1.478 ..P WKT 2010 12 27 20 59 55 31.3200 -97.3300 251.000 457.0 147.661 6.580 -999.990 -999.990 1.477 ..P WKT 2010 12 27 21 09 55 31.3200 -97.3300 251.000 30.0 142.176 6.310 -999.990 -999.990 1.422 ..P WKT 2010 12 27 21 14 55 31.3200 -97.3300 251.000 122.0 135.741 6.740 -999.990 -999.990 1.357 ..P WKT 2010 12 27 21 19 55 31.3200 -97.3300 251.000 457.0 131.973 6.290 -999.990 -999.990 1.320 ..P WKT 2010 12 27 21 24 55 31.3200 -97.3300 251.000 30.0 143.264 6.300 -999.990 -999.990 1.433 ..P WKT 2010 12 27 21 29 55 31.3200 -97.3300 251.000 122.0 140.295 6.140 -999.990 -999.990 1.403 ..P WKT 2010 12 27 21 34 55 31.3200 -97.3300 251.000 457.0 141.990 6.020 -999.990 -999.990 1.420 ..P WKT 2010 12 27 21 44 55 31.3200 -97.3300 251.000 30.0 142.925 5.770 -999.990 -999.990 1.429 ..P WKT 2010 12 27 21 49 55 31.3200 -97.3300 251.000 122.0 143.097 5.840 -999.990 -999.990 1.431 ..P WKT 2010 12 27 21 54 55 31.3200 -97.3300 251.000 457.0 147.394 6.400 -999.990 -999.990 1.474 ..P WKT 2010 12 27 21 59 55 31.3200 -97.3300 251.000 30.0 148.896 6.300 -999.990 -999.990 1.489 ..P WKT 2010 12 27 22 04 55 31.3200 -97.3300 251.000 122.0 163.835 6.090 -999.990 -999.990 1.638 ..P WKT 2010 12 27 22 09 55 31.3200 -97.3300 251.000 457.0 145.380 5.890 -999.990 -999.990 1.454 ..P WKT 2010 12 27 22 19 55 31.3200 -97.3300 251.000 30.0 162.496 6.210 -999.990 -999.990 1.625 ..P WKT 2010 12 27 22 24 55 31.3200 -97.3300 251.000 122.0 160.955 6.030 -999.990 -999.990 1.610 ..P WKT 2010 12 27 22 29 55 31.3200 -97.3300 251.000 457.0 158.085 6.180 -999.990 -999.990 1.581 ..P WKT 2010 12 27 22 34 55 31.3200 -97.3300 251.000 30.0 151.362 6.140 -999.990 -999.990 1.514 ..P WKT 2010 12 27 22 39 55 31.3200 -97.3300 251.000 122.0 147.432 6.230 -999.990 -999.990 1.474 ..P WKT 2010 12 27 22 44 55 31.3200 -97.3300 251.000 457.0 148.419 5.780 -999.990 -999.990 1.484 ..P WKT 2010 12 27 22 54 55 31.3200 -97.3300 251.000 30.0 152.688 6.430 -999.990 -999.990 1.527 ..P WKT 2010 12 27 22 59 55 31.3200 -97.3300 251.000 122.0 152.383 6.150 -999.990 -999.990 1.524 ..P WKT 2010 12 27 23 04 55 31.3200 -97.3300 251.000 457.0 149.025 6.270 -999.990 -999.990 1.490 ..P WKT 2010 12 27 23 09 55 31.3200 -97.3300 251.000 30.0 149.915 6.110 -999.990 -999.990 1.499 ..P WKT 2010 12 27 23 14 55 31.3200 -97.3300 251.000 122.0 152.133 6.450 -999.990 -999.990 1.521 ..P WKT 2010 12 27 23 19 55 31.3200 -97.3300 251.000 457.0 146.920 5.890 -999.990 -999.990 1.469 ..P WKT 2010 12 27 23 29 55 31.3200 -97.3300 251.000 30.0 161.832 6.000 -999.990 -999.990 1.618 ..P WKT 2010 12 27 23 34 55 31.3200 -97.3300 251.000 122.0 159.669 6.040 -999.990 -999.990 1.597 ..P WKT 2010 12 27 23 39 55 31.3200 -97.3300 251.000 457.0 149.288 6.240 -999.990 -999.990 1.493 ..P WKT 2010 12 27 23 44 55 31.3200 -97.3300 251.000 30.0 165.421 7.270 -999.990 -999.990 1.654 ..P WKT 2010 12 27 23 49 55 31.3200 -97.3300 251.000 122.0 155.838 6.290 -999.990 -999.990 1.558 ..P WKT 2010 12 28 00 09 55 31.3200 -97.3300 251.000 457.0 145.639 5.820 -999.990 -999.990 1.456 ..P WKT 2010 12 28 00 10 25 31.3200 -97.3300 251.000 457.0 146.343 5.940 -999.990 -999.990 1.463 ..P WKT 2010 12 28 00 10 55 31.3200 -97.3300 251.000 457.0 143.337 5.880 -999.990 -999.990 1.433 ..P WKT 2010 12 28 00 11 25 31.3200 -97.3300 251.000 457.0 141.921 5.830 -999.990 -999.990 1.419 ..P WKT 2010 12 28 00 11 55 31.3200 -97.3300 251.000 457.0 138.650 5.840 -999.990 -999.990 1.387 ..P WKT 2010 12 28 00 12 25 31.3200 -97.3300 251.000 457.0 139.089 5.920 -999.990 -999.990 1.391 ..P WKT 2010 12 28 00 12 55 31.3200 -97.3300 251.000 457.0 136.612 6.240 -999.990 -999.990 1.366 ..P WKT 2010 12 28 00 13 25 31.3200 -97.3300 251.000 457.0 137.316 5.990 -999.990 -999.990 1.373 ..P WKT 2010 12 28 00 13 55 31.3200 -97.3300 251.000 457.0 138.815 6.110 -999.990 -999.990 1.388 ..P WKT 2010 12 28 00 14 25 31.3200 -97.3300 251.000 457.0 136.073 5.890 -999.990 -999.990 1.361 ..P WKT 2010 12 28 00 14 55 31.3200 -97.3300 251.000 457.0 141.283 5.990 -999.990 -999.990 1.413 ..P WKT 2010 12 28 00 19 55 31.3200 -97.3300 251.000 30.0 153.094 6.390 -999.990 -999.990 1.531 ..P WKT 2010 12 28 00 24 55 31.3200 -97.3300 251.000 122.0 151.388 6.540 -999.990 -999.990 1.514 ..P WKT 2010 12 28 00 29 55 31.3200 -97.3300 251.000 457.0 144.115 6.350 -999.990 -999.990 1.441 ..P WKT 2010 12 28 00 34 55 31.3200 -97.3300 251.000 30.0 163.353 6.840 -999.990 -999.990 1.634 ..P WKT 2010 12 28 00 39 55 31.3200 -97.3300 251.000 122.0 171.194 6.560 -999.990 -999.990 1.712 ..P WKT 2010 12 28 00 44 55 31.3200 -97.3300 251.000 457.0 141.115 6.100 -999.990 -999.990 1.411 ..P WKT 2010 12 28 00 54 55 31.3200 -97.3300 251.000 30.0 162.721 6.190 -999.990 -999.990 1.627 ..P WKT 2010 12 28 00 59 55 31.3200 -97.3300 251.000 122.0 160.311 7.090 -999.990 -999.990 1.603 ..P WKT 2010 12 28 01 04 55 31.3200 -97.3300 251.000 457.0 142.379 6.290 -999.990 -999.990 1.424 ..P WKT 2010 12 28 01 09 55 31.3200 -97.3300 251.000 30.0 170.610 6.250 -999.990 -999.990 1.706 ..P WKT 2010 12 28 01 14 55 31.3200 -97.3300 251.000 122.0 157.453 6.210 -999.990 -999.990 1.575 ..P WKT 2010 12 28 01 19 55 31.3200 -97.3300 251.000 457.0 141.241 6.080 -999.990 -999.990 1.412 ..P WKT 2010 12 28 01 29 55 31.3200 -97.3300 251.000 30.0 158.403 6.170 -999.990 -999.990 1.584 ..P WKT 2010 12 28 01 34 55 31.3200 -97.3300 251.000 122.0 161.128 6.360 -999.990 -999.990 1.611 ..P WKT 2010 12 28 01 39 55 31.3200 -97.3300 251.000 457.0 145.536 6.000 -999.990 -999.990 1.455 ..P WKT 2010 12 28 01 44 55 31.3200 -97.3300 251.000 30.0 155.030 6.440 -999.990 -999.990 1.550 ..P WKT 2010 12 28 01 49 55 31.3200 -97.3300 251.000 122.0 154.039 6.090 -999.990 -999.990 1.540 ..P WKT 2010 12 28 01 54 55 31.3200 -97.3300 251.000 457.0 140.433 6.440 -999.990 -999.990 1.404 ..P WKT 2010 12 28 02 04 55 31.3200 -97.3300 251.000 30.0 151.726 6.260 -999.990 -999.990 1.517 ..P WKT 2010 12 28 02 09 55 31.3200 -97.3300 251.000 122.0 153.921 6.100 -999.990 -999.990 1.539 ..P WKT 2010 12 28 02 14 55 31.3200 -97.3300 251.000 457.0 132.473 6.350 -999.990 -999.990 1.325 ..P WKT 2010 12 28 02 19 55 31.3200 -97.3300 251.000 30.0 156.585 6.400 -999.990 -999.990 1.566 ..P WKT 2010 12 28 02 24 55 31.3200 -97.3300 251.000 122.0 149.614 6.510 -999.990 -999.990 1.496 ..P WKT 2010 12 28 02 29 55 31.3200 -97.3300 251.000 457.0 143.307 6.710 -999.990 -999.990 1.433 ..P WKT 2010 12 28 02 39 55 31.3200 -97.3300 251.000 30.0 148.988 6.330 -999.990 -999.990 1.490 ..P WKT 2010 12 28 02 44 55 31.3200 -97.3300 251.000 122.0 147.293 6.930 -999.990 -999.990 1.473 ..P WKT 2010 12 28 02 49 55 31.3200 -97.3300 251.000 457.0 131.772 6.590 -999.990 -999.990 1.318 ..P WKT 2010 12 28 02 54 55 31.3200 -97.3300 251.000 30.0 150.546 8.460 -999.990 -999.990 1.505 ..P WKT 2010 12 28 02 59 55 31.3200 -97.3300 251.000 122.0 142.602 6.400 -999.990 -999.990 1.426 ..P WKT 2010 12 28 03 04 55 31.3200 -97.3300 251.000 457.0 131.065 6.480 -999.990 -999.990 1.311 ..P WKT 2010 12 28 03 14 55 31.3200 -97.3300 251.000 30.0 144.670 6.410 -999.990 -999.990 1.447 ..P WKT 2010 12 28 03 19 55 31.3200 -97.3300 251.000 122.0 142.156 6.190 -999.990 -999.990 1.422 ..P WKT 2010 12 28 03 24 55 31.3200 -97.3300 251.000 457.0 127.670 6.150 -999.990 -999.990 1.277 ..P WKT 2010 12 28 03 29 55 31.3200 -97.3300 251.000 30.0 138.189 5.920 -999.990 -999.990 1.382 ..P WKT 2010 12 28 03 34 55 31.3200 -97.3300 251.000 122.0 143.123 5.590 -999.990 -999.990 1.431 ..P WKT 2010 12 28 03 39 55 31.3200 -97.3300 251.000 457.0 126.504 5.710 -999.990 -999.990 1.265 ..P WKT 2010 12 28 03 49 55 31.3200 -97.3300 251.000 30.0 147.095 5.320 -999.990 -999.990 1.471 ..P WKT 2010 12 28 03 54 55 31.3200 -97.3300 251.000 122.0 138.000 5.460 -999.990 -999.990 1.380 ..P WKT 2010 12 28 03 59 55 31.3200 -97.3300 251.000 457.0 124.911 5.790 -999.990 -999.990 1.249 ..P WKT 2010 12 28 04 04 55 31.3200 -97.3300 251.000 30.0 140.040 6.610 -999.990 -999.990 1.400 ..P WKT 2010 12 28 04 09 55 31.3200 -97.3300 251.000 122.0 141.059 5.310 -999.990 -999.990 1.411 ..P WKT 2010 12 28 04 14 55 31.3200 -97.3300 251.000 457.0 119.711 5.650 -999.990 -999.990 1.197 ..P WKT 2010 12 28 04 24 55 31.3200 -97.3300 251.000 30.0 138.489 5.770 -999.990 -999.990 1.385 ..P WKT 2010 12 28 04 29 55 31.3200 -97.3300 251.000 122.0 142.135 5.430 -999.990 -999.990 1.421 ..P WKT 2010 12 28 04 34 55 31.3200 -97.3300 251.000 457.0 119.676 6.060 -999.990 -999.990 1.197 ..P WKT 2010 12 28 04 39 55 31.3200 -97.3300 251.000 30.0 148.096 5.810 -999.990 -999.990 1.481 ..P WKT 2010 12 28 04 44 55 31.3200 -97.3300 251.000 122.0 148.014 6.320 -999.990 -999.990 1.480 ..P WKT 2010 12 28 04 49 55 31.3200 -97.3300 251.000 457.0 122.884 5.680 -999.990 -999.990 1.229 ..P WKT 2010 12 28 05 04 55 31.3200 -97.3300 251.000 30.0 147.280 5.840 -999.990 -999.990 1.473 ..P WKT 2010 12 28 05 09 55 31.3200 -97.3300 251.000 122.0 141.197 5.930 -999.990 -999.990 1.412 ..P WKT 2010 12 28 05 14 55 31.3200 -97.3300 251.000 457.0 114.185 6.600 -999.990 -999.990 1.142 ..P WKT 2010 12 28 05 19 55 31.3200 -97.3300 251.000 30.0 143.158 5.490 -999.990 -999.990 1.432 ..P WKT 2010 12 28 05 24 55 31.3200 -97.3300 251.000 122.0 145.606 7.740 -999.990 -999.990 1.456 ..P WKT 2010 12 28 05 29 55 31.3200 -97.3300 251.000 457.0 125.254 5.950 -999.990 -999.990 1.253 ..P WKT 2010 12 28 05 39 55 31.3200 -97.3300 251.000 30.0 140.609 5.620 -999.990 -999.990 1.406 ..P WKT 2010 12 28 05 44 55 31.3200 -97.3300 251.000 122.0 145.118 5.140 -999.990 -999.990 1.451 ..P WKT 2010 12 28 05 49 55 31.3200 -97.3300 251.000 457.0 122.683 5.570 -999.990 -999.990 1.227 ..P WKT 2010 12 28 05 54 55 31.3200 -97.3300 251.000 30.0 141.732 4.880 -999.990 -999.990 1.417 ..P WKT 2010 12 28 05 59 55 31.3200 -97.3300 251.000 122.0 147.176 5.170 -999.990 -999.990 1.472 ..P WKT 2010 12 28 06 04 55 31.3200 -97.3300 251.000 457.0 115.127 4.850 -999.990 -999.990 1.151 ..P WKT 2010 12 28 06 14 55 31.3200 -97.3300 251.000 30.0 138.901 4.840 -999.990 -999.990 1.389 ..P WKT 2010 12 28 06 19 55 31.3200 -97.3300 251.000 122.0 146.025 4.920 -999.990 -999.990 1.460 ..P WKT 2010 12 28 06 24 55 31.3200 -97.3300 251.000 457.0 118.579 5.620 -999.990 -999.990 1.186 ..P WKT 2010 12 28 06 29 55 31.3200 -97.3300 251.000 30.0 142.923 5.240 -999.990 -999.990 1.429 ..P WKT 2010 12 28 06 34 55 31.3200 -97.3300 251.000 122.0 142.439 5.240 -999.990 -999.990 1.424 ..P WKT 2010 12 28 06 39 55 31.3200 -97.3300 251.000 457.0 112.982 5.610 -999.990 -999.990 1.130 ..P WKT 2010 12 28 06 49 55 31.3200 -97.3300 251.000 30.0 145.203 5.690 -999.990 -999.990 1.452 ..P WKT 2010 12 28 06 54 55 31.3200 -97.3300 251.000 122.0 143.327 5.480 -999.990 -999.990 1.433 ..P WKT 2010 12 28 06 59 55 31.3200 -97.3300 251.000 457.0 116.473 5.460 -999.990 -999.990 1.165 ..P WKT 2010 12 28 07 04 55 31.3200 -97.3300 251.000 30.0 139.306 5.100 -999.990 -999.990 1.393 ..P WKT 2010 12 28 07 09 55 31.3200 -97.3300 251.000 122.0 142.906 5.380 -999.990 -999.990 1.429 ..P WKT 2010 12 28 07 14 55 31.3200 -97.3300 251.000 457.0 115.777 5.700 -999.990 -999.990 1.158 ..P WKT 2010 12 28 07 24 55 31.3200 -97.3300 251.000 30.0 150.903 5.360 -999.990 -999.990 1.509 ..P WKT 2010 12 28 07 29 55 31.3200 -97.3300 251.000 122.0 136.196 5.450 -999.990 -999.990 1.362 ..P WKT 2010 12 28 07 34 55 31.3200 -97.3300 251.000 457.0 125.496 6.090 -999.990 -999.990 1.255 ..P WKT 2010 12 28 07 39 55 31.3200 -97.3300 251.000 30.0 135.111 6.070 -999.990 -999.990 1.351 ..P WKT 2010 12 28 07 44 55 31.3200 -97.3300 251.000 122.0 143.125 5.550 -999.990 -999.990 1.431 ..P WKT 2010 12 28 07 49 55 31.3200 -97.3300 251.000 457.0 121.192 4.650 -999.990 -999.990 1.212 ..P WKT 2010 12 28 07 59 55 31.3200 -97.3300 251.000 30.0 135.119 5.360 -999.990 -999.990 1.351 ..P WKT 2010 12 28 08 04 55 31.3200 -97.3300 251.000 122.0 137.824 5.480 -999.990 -999.990 1.378 ..P WKT 2010 12 28 08 09 55 31.3200 -97.3300 251.000 457.0 119.397 6.320 -999.990 -999.990 1.194 ..P WKT 2010 12 28 08 14 55 31.3200 -97.3300 251.000 30.0 142.434 6.990 -999.990 -999.990 1.424 ..P WKT 2010 12 28 08 19 55 31.3200 -97.3300 251.000 122.0 141.930 6.220 -999.990 -999.990 1.419 ..P WKT 2010 12 28 08 24 55 31.3200 -97.3300 251.000 457.0 127.245 5.040 -999.990 -999.990 1.272 ..P WKT 2010 12 28 08 34 55 31.3200 -97.3300 251.000 30.0 148.753 4.930 -999.990 -999.990 1.488 ..P WKT 2010 12 28 08 39 55 31.3200 -97.3300 251.000 122.0 151.232 6.460 -999.990 -999.990 1.512 ..P WKT 2010 12 28 08 44 55 31.3200 -97.3300 251.000 457.0 125.070 7.320 -999.990 -999.990 1.251 ..P WKT 2010 12 28 08 49 55 31.3200 -97.3300 251.000 30.0 147.090 5.930 -999.990 -999.990 1.471 ..P WKT 2010 12 28 08 54 55 31.3200 -97.3300 251.000 122.0 155.326 4.930 -999.990 -999.990 1.553 ..P WKT 2010 12 28 08 59 55 31.3200 -97.3300 251.000 457.0 121.123 5.340 -999.990 -999.990 1.211 ..P WKT 2010 12 28 09 09 55 31.3200 -97.3300 251.000 30.0 145.075 5.050 -999.990 -999.990 1.451 ..P WKT 2010 12 28 09 14 55 31.3200 -97.3300 251.000 122.0 151.018 5.030 -999.990 -999.990 1.510 ..P WKT 2010 12 28 09 19 55 31.3200 -97.3300 251.000 457.0 121.069 5.040 -999.990 -999.990 1.211 ..P WKT 2010 12 28 09 24 55 31.3200 -97.3300 251.000 30.0 149.111 4.960 -999.990 -999.990 1.491 ..P WKT 2010 12 28 09 29 55 31.3200 -97.3300 251.000 122.0 150.904 6.250 -999.990 -999.990 1.509 ..P WKT 2010 12 28 09 34 55 31.3200 -97.3300 251.000 457.0 122.688 4.190 -999.990 -999.990 1.227 ..P WKT 2010 12 28 09 44 55 31.3200 -97.3300 251.000 30.0 152.283 4.630 -999.990 -999.990 1.523 ..P WKT 2010 12 28 09 49 55 31.3200 -97.3300 251.000 122.0 156.776 4.770 -999.990 -999.990 1.568 ..P WKT 2010 12 28 09 54 55 31.3200 -97.3300 251.000 457.0 124.682 4.390 -999.990 -999.990 1.247 ..P WKT 2010 12 28 09 59 55 31.3200 -97.3300 251.000 30.0 157.454 4.890 -999.990 -999.990 1.575 ..P WKT 2010 12 28 10 04 55 31.3200 -97.3300 251.000 122.0 158.061 4.740 -999.990 -999.990 1.581 ..P WKT 2010 12 28 10 09 55 31.3200 -97.3300 251.000 457.0 119.926 4.540 -999.990 -999.990 1.199 ..P WKT 2010 12 28 10 19 55 31.3200 -97.3300 251.000 30.0 153.410 4.640 -999.990 -999.990 1.534 ..P WKT 2010 12 28 10 24 55 31.3200 -97.3300 251.000 122.0 156.124 4.680 -999.990 -999.990 1.561 ..P WKT 2010 12 28 10 29 55 31.3200 -97.3300 251.000 457.0 124.372 4.990 -999.990 -999.990 1.244 ..P WKT 2010 12 28 10 34 55 31.3200 -97.3300 251.000 30.0 153.507 4.910 -999.990 -999.990 1.535 ..P WKT 2010 12 28 10 39 55 31.3200 -97.3300 251.000 122.0 155.551 5.270 -999.990 -999.990 1.556 ..P WKT 2010 12 28 10 44 55 31.3200 -97.3300 251.000 457.0 123.254 4.550 -999.990 -999.990 1.233 ..P WKT 2010 12 28 10 54 55 31.3200 -97.3300 251.000 30.0 159.234 5.310 -999.990 -999.990 1.592 ..P WKT 2010 12 28 10 59 55 31.3200 -97.3300 251.000 122.0 161.510 4.590 -999.990 -999.990 1.615 ..P WKT 2010 12 28 11 04 55 31.3200 -97.3300 251.000 457.0 121.110 4.110 -999.990 -999.990 1.211 ..P WKT 2010 12 28 11 09 55 31.3200 -97.3300 251.000 30.0 156.131 4.260 -999.990 -999.990 1.561 ..P WKT 2010 12 28 11 14 55 31.3200 -97.3300 251.000 122.0 156.528 4.120 -999.990 -999.990 1.565 ..P WKT 2010 12 28 11 19 55 31.3200 -97.3300 251.000 457.0 119.875 4.050 -999.990 -999.990 1.199 ..P WKT 2010 12 28 11 29 55 31.3200 -97.3300 251.000 30.0 162.994 4.450 -999.990 -999.990 1.630 ..P WKT 2010 12 28 11 34 55 31.3200 -97.3300 251.000 122.0 155.508 4.220 -999.990 -999.990 1.555 ..P WKT 2010 12 28 11 39 55 31.3200 -97.3300 251.000 457.0 122.505 4.530 -999.990 -999.990 1.225 ..P WKT 2010 12 28 11 44 55 31.3200 -97.3300 251.000 30.0 154.230 4.130 -999.990 -999.990 1.542 ..P WKT 2010 12 28 11 49 55 31.3200 -97.3300 251.000 122.0 154.263 4.290 -999.990 -999.990 1.543 ..P WKT 2010 12 28 12 09 55 31.3200 -97.3300 251.000 457.0 129.240 4.020 -999.990 -999.990 1.292 ..P WKT 2010 12 28 12 10 25 31.3200 -97.3300 251.000 457.0 123.859 4.760 -999.990 -999.990 1.239 ..P WKT 2010 12 28 12 10 55 31.3200 -97.3300 251.000 457.0 131.105 3.830 -999.990 -999.990 1.311 ..P WKT 2010 12 28 12 11 25 31.3200 -97.3300 251.000 457.0 124.649 3.930 -999.990 -999.990 1.246 ..P WKT 2010 12 28 12 11 55 31.3200 -97.3300 251.000 457.0 130.553 4.100 -999.990 -999.990 1.306 ..P WKT 2010 12 28 12 12 25 31.3200 -97.3300 251.000 457.0 128.395 3.850 -999.990 -999.990 1.284 ..P WKT 2010 12 28 12 12 55 31.3200 -97.3300 251.000 457.0 123.014 4.070 -999.990 -999.990 1.230 ..P WKT 2010 12 28 12 13 25 31.3200 -97.3300 251.000 457.0 127.305 3.910 -999.990 -999.990 1.273 ..P WKT 2010 12 28 12 13 55 31.3200 -97.3300 251.000 457.0 125.686 4.430 -999.990 -999.990 1.257 ..P WKT 2010 12 28 12 14 25 31.3200 -97.3300 251.000 457.0 128.364 4.270 -999.990 -999.990 1.284 ..P WKT 2010 12 28 12 14 55 31.3200 -97.3300 251.000 457.0 124.864 3.990 -999.990 -999.990 1.249 ..P WKT 2010 12 28 12 19 55 31.3200 -97.3300 251.000 30.0 147.891 4.210 -999.990 -999.990 1.479 ..P WKT 2010 12 28 12 24 55 31.3200 -97.3300 251.000 122.0 146.470 4.570 -999.990 -999.990 1.465 ..P WKT 2010 12 28 12 29 55 31.3200 -97.3300 251.000 457.0 118.721 4.640 -999.990 -999.990 1.187 ..P WKT 2010 12 28 12 34 55 31.3200 -97.3300 251.000 30.0 153.297 4.660 -999.990 -999.990 1.533 ..P WKT 2010 12 28 12 39 55 31.3200 -97.3300 251.000 122.0 149.459 5.430 -999.990 -999.990 1.495 ..P WKT 2010 12 28 12 44 55 31.3200 -97.3300 251.000 457.0 124.129 4.840 -999.990 -999.990 1.241 ..P WKT 2010 12 28 12 54 55 31.3200 -97.3300 251.000 30.0 144.770 4.830 -999.990 -999.990 1.448 ..P WKT 2010 12 28 12 59 55 31.3200 -97.3300 251.000 122.0 141.582 4.880 -999.990 -999.990 1.416 ..P WKT 2010 12 28 13 04 55 31.3200 -97.3300 251.000 457.0 117.040 4.820 -999.990 -999.990 1.170 ..P WKT 2010 12 28 13 09 55 31.3200 -97.3300 251.000 30.0 148.500 5.040 -999.990 -999.990 1.485 ..P WKT 2010 12 28 13 14 55 31.3200 -97.3300 251.000 122.0 144.372 4.420 -999.990 -999.990 1.444 ..P WKT 2010 12 28 13 19 55 31.3200 -97.3300 251.000 457.0 120.102 4.330 -999.990 -999.990 1.201 ..P WKT 2010 12 28 13 29 55 31.3200 -97.3300 251.000 30.0 145.531 5.950 -999.990 -999.990 1.455 ..P WKT 2010 12 28 13 34 55 31.3200 -97.3300 251.000 122.0 142.996 4.440 -999.990 -999.990 1.430 ..P WKT 2010 12 28 13 39 55 31.3200 -97.3300 251.000 457.0 121.797 3.870 -999.990 -999.990 1.218 ..P WKT 2010 12 28 13 44 55 31.3200 -97.3300 251.000 30.0 146.920 4.630 -999.990 -999.990 1.469 ..P WKT 2010 12 28 13 49 55 31.3200 -97.3300 251.000 122.0 140.626 4.150 -999.990 -999.990 1.406 ..P WKT 2010 12 28 13 54 55 31.3200 -97.3300 251.000 457.0 121.443 4.190 -999.990 -999.990 1.214 ..P WKT 2010 12 28 14 04 55 31.3200 -97.3300 251.000 30.0 141.727 5.060 -999.990 -999.990 1.417 ..P WKT 2010 12 28 14 09 55 31.3200 -97.3300 251.000 122.0 133.803 3.970 -999.990 -999.990 1.338 ..P WKT 2010 12 28 14 14 55 31.3200 -97.3300 251.000 457.0 120.913 4.210 -999.990 -999.990 1.209 ..P WKT 2010 12 28 14 19 55 31.3200 -97.3300 251.000 30.0 141.046 4.030 -999.990 -999.990 1.410 ..P WKT 2010 12 28 14 24 55 31.3200 -97.3300 251.000 122.0 135.271 4.100 -999.990 -999.990 1.353 ..P WKT 2010 12 28 14 29 55 31.3200 -97.3300 251.000 457.0 123.589 4.720 -999.990 -999.990 1.236 ..P WKT 2010 12 28 14 39 55 31.3200 -97.3300 251.000 30.0 143.946 4.490 -999.990 -999.990 1.439 ..P WKT 2010 12 28 14 44 55 31.3200 -97.3300 251.000 122.0 135.851 4.410 -999.990 -999.990 1.359 ..P WKT 2010 12 28 14 49 55 31.3200 -97.3300 251.000 457.0 123.999 4.040 -999.990 -999.990 1.240 ..P WKT 2010 12 28 14 54 55 31.3200 -97.3300 251.000 30.0 141.942 4.280 -999.990 -999.990 1.419 ..P WKT 2010 12 28 14 59 55 31.3200 -97.3300 251.000 122.0 140.826 3.900 -999.990 -999.990 1.408 ..P WKT 2010 12 28 15 04 55 31.3200 -97.3300 251.000 457.0 120.922 4.760 -999.990 -999.990 1.209 ..P WKT 2010 12 28 15 14 55 31.3200 -97.3300 251.000 30.0 139.167 5.290 -999.990 -999.990 1.392 ..P WKT 2010 12 28 15 19 55 31.3200 -97.3300 251.000 122.0 141.886 4.410 -999.990 -999.990 1.419 ..P WKT 2010 12 28 15 24 55 31.3200 -97.3300 251.000 457.0 119.646 4.140 -999.990 -999.990 1.196 ..P WKT 2010 12 28 15 29 55 31.3200 -97.3300 251.000 30.0 145.176 3.930 -999.990 -999.990 1.452 ..P WKT 2010 12 28 15 34 55 31.3200 -97.3300 251.000 122.0 151.920 4.550 -999.990 -999.990 1.519 ..P WKT 2010 12 28 15 39 55 31.3200 -97.3300 251.000 457.0 126.998 5.050 -999.990 -999.990 1.270 ..P WKT 2010 12 28 15 49 55 31.3200 -97.3300 251.000 30.0 144.433 4.540 -999.990 -999.990 1.444 ..P WKT 2010 12 28 15 54 55 31.3200 -97.3300 251.000 122.0 137.952 4.440 -999.990 -999.990 1.380 ..P WKT 2010 12 28 15 59 55 31.3200 -97.3300 251.000 457.0 126.641 4.880 -999.990 -999.990 1.266 ..P WKT 2010 12 28 16 04 55 31.3200 -97.3300 251.000 30.0 144.844 3.950 -999.990 -999.990 1.448 ..P WKT 2010 12 28 16 09 55 31.3200 -97.3300 251.000 122.0 141.314 4.760 -999.990 -999.990 1.413 ..P WKT 2010 12 28 16 14 55 31.3200 -97.3300 251.000 457.0 130.809 3.970 -999.990 -999.990 1.308 ..P WKT 2010 12 28 16 24 55 31.3200 -97.3300 251.000 30.0 138.946 4.280 -999.990 -999.990 1.389 ..P WKT 2010 12 28 16 29 55 31.3200 -97.3300 251.000 122.0 135.589 4.550 -999.990 -999.990 1.356 ..P WKT 2010 12 28 16 34 55 31.3200 -97.3300 251.000 457.0 123.380 5.030 -999.990 -999.990 1.234 ..P WKT 2010 12 28 16 39 55 31.3200 -97.3300 251.000 30.0 138.802 4.940 -999.990 -999.990 1.388 ..P WKT 2010 12 28 16 44 55 31.3200 -97.3300 251.000 122.0 131.020 5.160 -999.990 -999.990 1.310 ..P WKT 2010 12 28 16 49 55 31.3200 -97.3300 251.000 457.0 118.410 3.840 -999.990 -999.990 1.184 ..P WKT 2010 12 28 17 04 55 31.3200 -97.3300 251.000 30.0 138.617 4.390 -999.990 -999.990 1.386 ..P WKT 2010 12 28 17 09 55 31.3200 -97.3300 251.000 122.0 136.519 5.290 -999.990 -999.990 1.365 ..P WKT 2010 12 28 17 14 55 31.3200 -97.3300 251.000 457.0 116.316 5.100 -999.990 -999.990 1.163 ..P WKT 2010 12 28 17 19 55 31.3200 -97.3300 251.000 30.0 137.685 4.360 -999.990 -999.990 1.377 ..P WKT 2010 12 28 17 24 55 31.3200 -97.3300 251.000 122.0 145.107 3.960 -999.990 -999.990 1.451 ..P WKT 2010 12 28 17 29 55 31.3200 -97.3300 251.000 457.0 135.231 3.800 -999.990 -999.990 1.352 ..P WKT 2010 12 28 17 39 55 31.3200 -97.3300 251.000 30.0 145.024 3.700 -999.990 -999.990 1.450 ..P WKT 2010 12 28 17 44 55 31.3200 -97.3300 251.000 122.0 145.921 5.230 -999.990 -999.990 1.459 ..P WKT 2010 12 28 17 49 55 31.3200 -97.3300 251.000 457.0 134.081 4.390 -999.990 -999.990 1.341 ..P WKT 2010 12 28 17 54 55 31.3200 -97.3300 251.000 30.0 143.424 4.820 -999.990 -999.990 1.434 ..P WKT 2010 12 28 17 59 55 31.3200 -97.3300 251.000 122.0 142.980 4.920 -999.990 -999.990 1.430 ..P WKT 2010 12 28 18 04 55 31.3200 -97.3300 251.000 457.0 137.441 4.700 -999.990 -999.990 1.374 ..P WKT 2010 12 28 18 14 55 31.3200 -97.3300 251.000 30.0 143.888 4.360 -999.990 -999.990 1.439 ..P WKT 2010 12 28 18 19 55 31.3200 -97.3300 251.000 122.0 144.344 4.670 -999.990 -999.990 1.443 ..P WKT 2010 12 28 18 24 55 31.3200 -97.3300 251.000 457.0 133.540 5.510 -999.990 -999.990 1.335 ..P WKT 2010 12 28 18 29 55 31.3200 -97.3300 251.000 30.0 142.709 5.270 -999.990 -999.990 1.427 ..P WKT 2010 12 28 18 34 55 31.3200 -97.3300 251.000 122.0 140.753 5.260 -999.990 -999.990 1.408 ..P WKT 2010 12 28 18 39 55 31.3200 -97.3300 251.000 457.0 119.227 4.880 -999.990 -999.990 1.192 ..P WKT 2010 12 28 18 49 55 31.3200 -97.3300 251.000 30.0 141.355 5.850 -999.990 -999.990 1.414 ..P WKT 2010 12 28 18 54 55 31.3200 -97.3300 251.000 122.0 132.736 5.040 -999.990 -999.990 1.327 ..P WKT 2010 12 28 18 59 55 31.3200 -97.3300 251.000 457.0 116.612 5.150 -999.990 -999.990 1.166 ..P WKT 2010 12 28 19 04 55 31.3200 -97.3300 251.000 30.0 141.229 4.460 -999.990 -999.990 1.412 ..P WKT 2010 12 28 19 09 55 31.3200 -97.3300 251.000 122.0 137.704 4.350 -999.990 -999.990 1.377 ..P WKT 2010 12 28 19 14 55 31.3200 -97.3300 251.000 457.0 123.993 4.210 -999.990 -999.990 1.240 ..P WKT 2010 12 28 19 24 55 31.3200 -97.3300 251.000 30.0 157.065 5.160 -999.990 -999.990 1.571 ..P WKT 2010 12 28 19 29 55 31.3200 -97.3300 251.000 122.0 137.116 4.010 -999.990 -999.990 1.371 ..P WKT 2010 12 28 19 34 55 31.3200 -97.3300 251.000 457.0 124.939 3.990 -999.990 -999.990 1.249 ..P WKT 2010 12 28 19 39 55 31.3200 -97.3300 251.000 30.0 184.310 4.520 -999.990 -999.990 1.843 ..P WKT 2010 12 28 19 44 55 31.3200 -97.3300 251.000 122.0 147.747 4.160 -999.990 -999.990 1.477 ..P WKT 2010 12 28 19 49 55 31.3200 -97.3300 251.000 457.0 124.585 5.280 -999.990 -999.990 1.246 ..P WKT 2010 12 28 19 59 55 31.3200 -97.3300 251.000 30.0 170.090 5.910 -999.990 -999.990 1.701 ..P WKT 2010 12 28 20 04 55 31.3200 -97.3300 251.000 122.0 139.886 3.960 -999.990 -999.990 1.399 ..P WKT 2010 12 28 20 09 55 31.3200 -97.3300 251.000 457.0 124.956 4.600 -999.990 -999.990 1.250 ..P WKT 2010 12 28 20 14 55 31.3200 -97.3300 251.000 30.0 141.372 4.050 -999.990 -999.990 1.414 ..P WKT 2010 12 28 20 19 55 31.3200 -97.3300 251.000 122.0 137.962 3.810 -999.990 -999.990 1.380 ..P WKT 2010 12 28 20 24 55 31.3200 -97.3300 251.000 457.0 123.569 3.580 -999.990 -999.990 1.236 ..P WKT 2010 12 28 20 34 55 31.3200 -97.3300 251.000 30.0 143.979 5.100 -999.990 -999.990 1.440 ..P WKT 2010 12 28 20 39 55 31.3200 -97.3300 251.000 122.0 137.796 3.850 -999.990 -999.990 1.378 ..P WKT 2010 12 28 20 44 55 31.3200 -97.3300 251.000 457.0 124.647 4.070 -999.990 -999.990 1.246 ..P WKT 2010 12 28 20 49 55 31.3200 -97.3300 251.000 30.0 147.929 4.200 -999.990 -999.990 1.479 ..P WKT 2010 12 28 20 54 55 31.3200 -97.3300 251.000 122.0 140.406 4.170 -999.990 -999.990 1.404 ..P WKT 2010 12 28 20 59 55 31.3200 -97.3300 251.000 457.0 123.108 4.220 -999.990 -999.990 1.231 ..P WKT 2010 12 28 21 09 55 31.3200 -97.3300 251.000 30.0 139.727 4.100 -999.990 -999.990 1.397 ..P WKT 2010 12 28 21 14 55 31.3200 -97.3300 251.000 122.0 145.385 4.160 -999.990 -999.990 1.454 ..P WKT 2010 12 28 21 19 55 31.3200 -97.3300 251.000 457.0 130.155 3.950 -999.990 -999.990 1.302 ..P WKT 2010 12 28 21 24 55 31.3200 -97.3300 251.000 30.0 147.329 4.640 -999.990 -999.990 1.473 ..P WKT 2010 12 28 21 29 55 31.3200 -97.3300 251.000 122.0 148.435 4.120 -999.990 -999.990 1.484 ..P WKT 2010 12 28 21 34 55 31.3200 -97.3300 251.000 457.0 123.163 3.760 -999.990 -999.990 1.232 ..P WKT 2010 12 28 21 44 55 31.3200 -97.3300 251.000 30.0 148.290 5.030 -999.990 -999.990 1.483 ..P WKT 2010 12 28 21 49 55 31.3200 -97.3300 251.000 122.0 139.374 4.980 -999.990 -999.990 1.394 ..P WKT 2010 12 28 21 54 55 31.3200 -97.3300 251.000 457.0 127.646 3.700 -999.990 -999.990 1.276 ..P WKT 2010 12 28 21 59 55 31.3200 -97.3300 251.000 30.0 158.626 3.720 -999.990 -999.990 1.586 ..P WKT 2010 12 28 22 04 55 31.3200 -97.3300 251.000 122.0 141.276 3.930 -999.990 -999.990 1.413 ..P WKT 2010 12 28 22 09 55 31.3200 -97.3300 251.000 457.0 119.241 4.460 -999.990 -999.990 1.192 ..P WKT 2010 12 28 22 19 55 31.3200 -97.3300 251.000 30.0 158.858 4.020 -999.990 -999.990 1.589 ..P WKT 2010 12 28 22 24 55 31.3200 -97.3300 251.000 122.0 139.655 4.630 -999.990 -999.990 1.397 ..P WKT 2010 12 28 22 29 55 31.3200 -97.3300 251.000 457.0 123.666 3.880 -999.990 -999.990 1.237 ..P WKT 2010 12 28 22 34 55 31.3200 -97.3300 251.000 30.0 156.131 4.440 -999.990 -999.990 1.561 ..P WKT 2010 12 28 22 39 55 31.3200 -97.3300 251.000 122.0 127.427 4.100 -999.990 -999.990 1.274 ..P WKT 2010 12 28 22 44 55 31.3200 -97.3300 251.000 457.0 123.485 4.550 -999.990 -999.990 1.235 ..P WKT 2010 12 28 22 54 55 31.3200 -97.3300 251.000 30.0 158.849 4.440 -999.990 -999.990 1.588 ..P WKT 2010 12 28 22 59 55 31.3200 -97.3300 251.000 122.0 118.926 4.120 -999.990 -999.990 1.189 ..P WKT 2010 12 28 23 04 55 31.3200 -97.3300 251.000 457.0 123.435 5.360 -999.990 -999.990 1.234 ..P WKT 2010 12 28 23 09 55 31.3200 -97.3300 251.000 30.0 157.652 4.770 -999.990 -999.990 1.577 ..P WKT 2010 12 28 23 14 55 31.3200 -97.3300 251.000 122.0 118.000 3.780 -999.990 -999.990 1.180 ..P WKT 2010 12 28 23 19 55 31.3200 -97.3300 251.000 457.0 132.946 4.330 -999.990 -999.990 1.329 ..P WKT 2010 12 28 23 29 55 31.3200 -97.3300 251.000 30.0 163.041 4.060 -999.990 -999.990 1.630 ..P WKT 2010 12 28 23 34 55 31.3200 -97.3300 251.000 122.0 130.021 4.090 -999.990 -999.990 1.300 ..P WKT 2010 12 28 23 39 55 31.3200 -97.3300 251.000 457.0 133.129 4.810 -999.990 -999.990 1.331 ..P WKT 2010 12 28 23 44 55 31.3200 -97.3300 251.000 30.0 155.235 3.670 -999.990 -999.990 1.552 ..P WKT 2010 12 28 23 49 55 31.3200 -97.3300 251.000 122.0 127.838 4.440 -999.990 -999.990 1.278 ..P WKT 2010 12 29 00 09 55 31.3200 -97.3300 251.000 457.0 125.107 3.690 -999.990 -999.990 1.251 ..P WKT 2010 12 29 00 10 25 31.3200 -97.3300 251.000 457.0 123.982 3.830 -999.990 -999.990 1.240 ..P WKT 2010 12 29 00 10 55 31.3200 -97.3300 251.000 457.0 123.928 3.950 -999.990 -999.990 1.239 ..P WKT 2010 12 29 00 11 25 31.3200 -97.3300 251.000 457.0 124.945 4.500 -999.990 -999.990 1.249 ..P WKT 2010 12 29 00 11 55 31.3200 -97.3300 251.000 457.0 122.214 4.280 -999.990 -999.990 1.222 ..P WKT 2010 12 29 00 12 25 31.3200 -97.3300 251.000 457.0 120.823 3.670 -999.990 -999.990 1.208 ..P WKT 2010 12 29 00 12 55 31.3200 -97.3300 251.000 457.0 119.966 4.170 -999.990 -999.990 1.200 ..P WKT 2010 12 29 00 13 25 31.3200 -97.3300 251.000 457.0 122.588 4.820 -999.990 -999.990 1.226 ..P WKT 2010 12 29 00 13 55 31.3200 -97.3300 251.000 457.0 121.464 4.030 -999.990 -999.990 1.215 ..P WKT 2010 12 29 00 14 25 31.3200 -97.3300 251.000 457.0 119.536 3.610 -999.990 -999.990 1.195 ..P WKT 2010 12 29 00 14 55 31.3200 -97.3300 251.000 457.0 120.553 3.600 -999.990 -999.990 1.206 ..P WKT 2010 12 29 00 19 55 31.3200 -97.3300 251.000 30.0 146.239 4.640 -999.990 -999.990 1.462 ..P WKT 2010 12 29 00 24 55 31.3200 -97.3300 251.000 122.0 120.811 4.130 -999.990 -999.990 1.208 ..P WKT 2010 12 29 00 29 55 31.3200 -97.3300 251.000 457.0 124.821 4.060 -999.990 -999.990 1.248 ..P WKT 2010 12 29 00 34 55 31.3200 -97.3300 251.000 30.0 144.088 6.150 -999.990 -999.990 1.441 ..P WKT 2010 12 29 00 39 55 31.3200 -97.3300 251.000 122.0 122.804 5.900 -999.990 -999.990 1.228 ..P WKT 2010 12 29 00 44 55 31.3200 -97.3300 251.000 457.0 122.264 4.500 -999.990 -999.990 1.223 ..P WKT 2010 12 29 00 54 55 31.3200 -97.3300 251.000 30.0 140.689 6.060 -999.990 -999.990 1.407 ..P WKT 2010 12 29 00 59 55 31.3200 -97.3300 251.000 122.0 118.024 4.710 -999.990 -999.990 1.180 ..P WKT 2010 12 29 01 04 55 31.3200 -97.3300 251.000 457.0 116.241 5.870 -999.990 -999.990 1.162 ..P WKT 2010 12 29 01 09 55 31.3200 -97.3300 251.000 30.0 268.551 11.690 -999.990 -999.990 2.686 ..P WKT 2010 12 29 01 14 55 31.3200 -97.3300 251.000 122.0 114.547 5.580 -999.990 -999.990 1.145 ..P WKT 2010 12 29 01 19 55 31.3200 -97.3300 251.000 457.0 117.718 4.900 -999.990 -999.990 1.177 ..P WKT 2010 12 29 01 29 55 31.3200 -97.3300 251.000 30.0 185.330 10.280 -999.990 -999.990 1.853 ..P WKT 2010 12 29 01 34 55 31.3200 -97.3300 251.000 122.0 112.920 4.490 -999.990 -999.990 1.129 ..P WKT 2010 12 29 01 39 55 31.3200 -97.3300 251.000 457.0 116.435 5.280 -999.990 -999.990 1.164 ..P WKT 2010 12 29 01 44 55 31.3200 -97.3300 251.000 30.0 131.736 4.510 -999.990 -999.990 1.317 ..P WKT 2010 12 29 01 49 55 31.3200 -97.3300 251.000 122.0 120.117 4.040 -999.990 -999.990 1.201 ..P WKT 2010 12 29 01 54 55 31.3200 -97.3300 251.000 457.0 118.812 4.220 -999.990 -999.990 1.188 ..P WKT 2010 12 29 02 04 55 31.3200 -97.3300 251.000 30.0 130.686 4.390 -999.990 -999.990 1.307 ..P WKT 2010 12 29 02 09 55 31.3200 -97.3300 251.000 122.0 115.735 4.900 -999.990 -999.990 1.157 ..P WKT 2010 12 29 02 14 55 31.3200 -97.3300 251.000 457.0 116.323 4.680 -999.990 -999.990 1.163 ..P WKT 2010 12 29 02 19 55 31.3200 -97.3300 251.000 30.0 140.223 4.870 -999.990 -999.990 1.402 ..P WKT 2010 12 29 02 24 55 31.3200 -97.3300 251.000 122.0 119.242 4.750 -999.990 -999.990 1.192 ..P WKT 2010 12 29 02 29 55 31.3200 -97.3300 251.000 457.0 126.932 4.660 -999.990 -999.990 1.269 ..P WKT 2010 12 29 02 39 55 31.3200 -97.3300 251.000 30.0 123.133 5.450 -999.990 -999.990 1.231 ..P WKT 2010 12 29 02 44 55 31.3200 -97.3300 251.000 122.0 123.971 5.030 -999.990 -999.990 1.240 ..P WKT 2010 12 29 02 49 55 31.3200 -97.3300 251.000 457.0 117.036 6.240 -999.990 -999.990 1.170 ..P WKT 2010 12 29 02 54 55 31.3200 -97.3300 251.000 30.0 159.688 8.920 -999.990 -999.990 1.597 ..P WKT 2010 12 29 02 59 55 31.3200 -97.3300 251.000 122.0 118.711 6.660 -999.990 -999.990 1.187 ..P WKT 2010 12 29 03 04 55 31.3200 -97.3300 251.000 457.0 123.301 5.170 -999.990 -999.990 1.233 ..P WKT 2010 12 29 03 14 55 31.3200 -97.3300 251.000 30.0 123.599 4.780 -999.990 -999.990 1.236 ..P WKT 2010 12 29 03 19 55 31.3200 -97.3300 251.000 122.0 122.522 6.490 -999.990 -999.990 1.225 ..P WKT 2010 12 29 03 24 55 31.3200 -97.3300 251.000 457.0 119.031 7.220 -999.990 -999.990 1.190 ..P WKT 2010 12 29 03 29 55 31.3200 -97.3300 251.000 30.0 117.418 6.790 -999.990 -999.990 1.174 ..P WKT 2010 12 29 03 34 55 31.3200 -97.3300 251.000 122.0 118.753 6.400 -999.990 -999.990 1.188 ..P WKT 2010 12 29 03 39 55 31.3200 -97.3300 251.000 457.0 116.603 5.220 -999.990 -999.990 1.166 ..P WKT 2010 12 29 03 49 55 31.3200 -97.3300 251.000 30.0 116.900 5.740 -999.990 -999.990 1.169 ..P WKT 2010 12 29 03 54 55 31.3200 -97.3300 251.000 122.0 112.911 6.020 -999.990 -999.990 1.129 ..P WKT 2010 12 29 03 59 55 31.3200 -97.3300 251.000 457.0 124.477 6.830 -999.990 -999.990 1.245 ..P WKT 2010 12 29 04 04 55 31.3200 -97.3300 251.000 30.0 115.391 5.950 -999.990 -999.990 1.154 ..P WKT 2010 12 29 04 09 55 31.3200 -97.3300 251.000 122.0 115.156 4.630 -999.990 -999.990 1.152 ..P WKT 2010 12 29 04 14 55 31.3200 -97.3300 251.000 457.0 130.748 4.100 -999.990 -999.990 1.307 ..P WKT 2010 12 29 04 24 55 31.3200 -97.3300 251.000 30.0 117.173 4.420 -999.990 -999.990 1.172 ..P WKT 2010 12 29 04 29 55 31.3200 -97.3300 251.000 122.0 121.000 4.860 -999.990 -999.990 1.210 ..P WKT 2010 12 29 04 34 55 31.3200 -97.3300 251.000 457.0 124.560 5.130 -999.990 -999.990 1.246 ..P WKT 2010 12 29 04 39 55 31.3200 -97.3300 251.000 30.0 114.839 4.400 -999.990 -999.990 1.148 ..P WKT 2010 12 29 04 44 55 31.3200 -97.3300 251.000 122.0 117.594 4.460 -999.990 -999.990 1.176 ..P WKT 2010 12 29 04 49 55 31.3200 -97.3300 251.000 457.0 122.362 4.190 -999.990 -999.990 1.224 ..P WKT 2010 12 29 05 04 55 31.3200 -97.3300 251.000 30.0 113.467 5.380 -999.990 -999.990 1.135 ..P WKT 2010 12 29 05 09 55 31.3200 -97.3300 251.000 122.0 114.418 4.370 -999.990 -999.990 1.144 ..P WKT 2010 12 29 05 14 55 31.3200 -97.3300 251.000 457.0 114.295 4.510 -999.990 -999.990 1.143 ..P WKT 2010 12 29 05 19 55 31.3200 -97.3300 251.000 30.0 115.918 4.990 -999.990 -999.990 1.159 ..P WKT 2010 12 29 05 24 55 31.3200 -97.3300 251.000 122.0 119.554 4.600 -999.990 -999.990 1.196 ..P WKT 2010 12 29 05 29 55 31.3200 -97.3300 251.000 457.0 118.626 4.950 -999.990 -999.990 1.186 ..P WKT 2010 12 29 05 39 55 31.3200 -97.3300 251.000 30.0 117.693 5.030 -999.990 -999.990 1.177 ..P WKT 2010 12 29 05 44 55 31.3200 -97.3300 251.000 122.0 124.938 4.580 -999.990 -999.990 1.249 ..P WKT 2010 12 29 05 49 55 31.3200 -97.3300 251.000 457.0 124.262 5.250 -999.990 -999.990 1.243 ..P WKT 2010 12 29 05 54 55 31.3200 -97.3300 251.000 30.0 120.498 4.630 -999.990 -999.990 1.205 ..P WKT 2010 12 29 05 59 55 31.3200 -97.3300 251.000 122.0 130.161 4.910 -999.990 -999.990 1.302 ..P WKT 2010 12 29 06 04 55 31.3200 -97.3300 251.000 457.0 112.566 5.320 -999.990 -999.990 1.126 ..P WKT 2010 12 29 06 14 55 31.3200 -97.3300 251.000 30.0 125.121 4.680 -999.990 -999.990 1.251 ..P WKT 2010 12 29 06 19 55 31.3200 -97.3300 251.000 122.0 121.568 4.920 -999.990 -999.990 1.216 ..P WKT 2010 12 29 06 24 55 31.3200 -97.3300 251.000 457.0 117.073 4.900 -999.990 -999.990 1.171 ..P WKT 2010 12 29 06 29 55 31.3200 -97.3300 251.000 30.0 126.950 4.850 -999.990 -999.990 1.270 ..P WKT 2010 12 29 06 34 55 31.3200 -97.3300 251.000 122.0 124.605 4.840 -999.990 -999.990 1.246 ..P WKT 2010 12 29 06 39 55 31.3200 -97.3300 251.000 457.0 114.871 4.760 -999.990 -999.990 1.149 ..P WKT 2010 12 29 06 49 55 31.3200 -97.3300 251.000 30.0 117.145 5.680 -999.990 -999.990 1.171 ..P WKT 2010 12 29 06 54 55 31.3200 -97.3300 251.000 122.0 115.451 4.590 -999.990 -999.990 1.155 ..P WKT 2010 12 29 06 59 55 31.3200 -97.3300 251.000 457.0 112.145 4.580 -999.990 -999.990 1.121 ..P WKT 2010 12 29 07 04 55 31.3200 -97.3300 251.000 30.0 112.332 4.840 -999.990 -999.990 1.123 ..P WKT 2010 12 29 07 09 55 31.3200 -97.3300 251.000 122.0 114.131 5.030 -999.990 -999.990 1.141 ..P WKT 2010 12 29 07 14 55 31.3200 -97.3300 251.000 457.0 107.330 4.610 -999.990 -999.990 1.073 ..P WKT 2010 12 29 07 24 55 31.3200 -97.3300 251.000 30.0 113.579 5.240 -999.990 -999.990 1.136 ..P WKT 2010 12 29 07 29 55 31.3200 -97.3300 251.000 122.0 114.533 4.970 -999.990 -999.990 1.145 ..P WKT 2010 12 29 07 34 55 31.3200 -97.3300 251.000 457.0 113.338 5.050 -999.990 -999.990 1.133 ..P WKT 2010 12 29 07 39 55 31.3200 -97.3300 251.000 30.0 115.637 4.660 -999.990 -999.990 1.156 ..P WKT 2010 12 29 07 44 55 31.3200 -97.3300 251.000 122.0 110.947 4.770 -999.990 -999.990 1.109 ..P WKT 2010 12 29 07 49 55 31.3200 -97.3300 251.000 457.0 116.472 4.650 -999.990 -999.990 1.165 ..P WKT 2010 12 29 07 59 55 31.3200 -97.3300 251.000 30.0 114.176 5.090 -999.990 -999.990 1.142 ..P WKT 2010 12 29 08 04 55 31.3200 -97.3300 251.000 122.0 118.186 4.380 -999.990 -999.990 1.182 ..P WKT 2010 12 29 08 09 55 31.3200 -97.3300 251.000 457.0 107.406 4.600 -999.990 -999.990 1.074 ..P WKT 2010 12 29 08 14 55 31.3200 -97.3300 251.000 30.0 116.255 4.450 -999.990 -999.990 1.163 ..P WKT 2010 12 29 08 19 55 31.3200 -97.3300 251.000 122.0 111.122 4.500 -999.990 -999.990 1.111 ..P WKT 2010 12 29 08 24 55 31.3200 -97.3300 251.000 457.0 113.114 4.620 -999.990 -999.990 1.131 ..P WKT 2010 12 29 08 34 55 31.3200 -97.3300 251.000 30.0 115.813 4.920 -999.990 -999.990 1.158 ..P WKT 2010 12 29 08 39 55 31.3200 -97.3300 251.000 122.0 112.887 4.910 -999.990 -999.990 1.129 ..P WKT 2010 12 29 08 44 55 31.3200 -97.3300 251.000 457.0 112.786 4.830 -999.990 -999.990 1.128 ..P WKT 2010 12 29 08 49 55 31.3200 -97.3300 251.000 30.0 121.696 5.230 -999.990 -999.990 1.217 ..P WKT 2010 12 29 08 54 55 31.3200 -97.3300 251.000 122.0 114.333 5.200 -999.990 -999.990 1.143 ..P WKT 2010 12 29 08 59 55 31.3200 -97.3300 251.000 457.0 110.734 4.970 -999.990 -999.990 1.107 ..P WKT 2010 12 29 09 09 55 31.3200 -97.3300 251.000 30.0 109.801 5.010 -999.990 -999.990 1.098 ..P WKT 2010 12 29 09 14 55 31.3200 -97.3300 251.000 122.0 120.405 4.990 -999.990 -999.990 1.204 ..P WKT 2010 12 29 09 19 55 31.3200 -97.3300 251.000 457.0 119.977 5.620 -999.990 -999.990 1.200 ..P WKT 2010 12 29 09 24 55 31.3200 -97.3300 251.000 30.0 113.629 6.070 -999.990 -999.990 1.136 ..P WKT 2010 12 29 09 29 55 31.3200 -97.3300 251.000 122.0 124.370 5.130 -999.990 -999.990 1.244 ..P WKT 2010 12 29 09 34 55 31.3200 -97.3300 251.000 457.0 116.945 4.840 -999.990 -999.990 1.169 ..P WKT 2010 12 29 09 44 55 31.3200 -97.3300 251.000 30.0 119.589 5.310 -999.990 -999.990 1.196 ..P WKT 2010 12 29 09 49 55 31.3200 -97.3300 251.000 122.0 121.314 5.080 -999.990 -999.990 1.213 ..P WKT 2010 12 29 09 54 55 31.3200 -97.3300 251.000 457.0 117.387 6.100 -999.990 -999.990 1.174 ..P WKT 2010 12 29 09 59 55 31.3200 -97.3300 251.000 30.0 121.669 5.080 -999.990 -999.990 1.217 ..P WKT 2010 12 29 10 04 55 31.3200 -97.3300 251.000 122.0 107.648 5.270 -999.990 -999.990 1.076 ..P WKT 2010 12 29 10 09 55 31.3200 -97.3300 251.000 457.0 113.277 5.690 -999.990 -999.990 1.133 ..P WKT 2010 12 29 10 19 55 31.3200 -97.3300 251.000 30.0 116.959 7.090 -999.990 -999.990 1.170 ..P WKT 2010 12 29 10 24 55 31.3200 -97.3300 251.000 122.0 117.838 6.160 -999.990 -999.990 1.178 ..P WKT 2010 12 29 10 29 55 31.3200 -97.3300 251.000 457.0 115.622 4.850 -999.990 -999.990 1.156 ..P WKT 2010 12 29 10 34 55 31.3200 -97.3300 251.000 30.0 116.771 6.570 -999.990 -999.990 1.168 ..P WKT 2010 12 29 10 39 55 31.3200 -97.3300 251.000 122.0 116.035 4.880 -999.990 -999.990 1.160 ..P WKT 2010 12 29 10 44 55 31.3200 -97.3300 251.000 457.0 111.259 4.580 -999.990 -999.990 1.113 ..P WKT 2010 12 29 10 54 55 31.3200 -97.3300 251.000 30.0 122.061 4.790 -999.990 -999.990 1.221 ..P WKT 2010 12 29 10 59 55 31.3200 -97.3300 251.000 122.0 109.628 4.650 -999.990 -999.990 1.096 ..P WKT 2010 12 29 11 04 55 31.3200 -97.3300 251.000 457.0 109.853 5.190 -999.990 -999.990 1.099 ..P WKT 2010 12 29 11 09 55 31.3200 -97.3300 251.000 30.0 113.312 4.990 -999.990 -999.990 1.133 ..P WKT 2010 12 29 11 14 55 31.3200 -97.3300 251.000 122.0 111.921 5.520 -999.990 -999.990 1.119 ..P WKT 2010 12 29 11 19 55 31.3200 -97.3300 251.000 457.0 113.763 5.040 -999.990 -999.990 1.138 ..P WKT 2010 12 29 11 29 55 31.3200 -97.3300 251.000 30.0 113.513 4.890 -999.990 -999.990 1.135 ..P WKT 2010 12 29 11 34 55 31.3200 -97.3300 251.000 122.0 116.808 5.050 -999.990 -999.990 1.168 ..P WKT 2010 12 29 11 39 55 31.3200 -97.3300 251.000 457.0 118.487 5.020 -999.990 -999.990 1.185 ..P WKT 2010 12 29 11 44 55 31.3200 -97.3300 251.000 30.0 116.394 5.050 -999.990 -999.990 1.164 ..P WKT 2010 12 29 11 49 55 31.3200 -97.3300 251.000 122.0 112.145 5.520 -999.990 -999.990 1.121 ..P WKT 2010 12 29 12 09 55 31.3200 -97.3300 251.000 457.0 122.868 5.610 -999.990 -999.990 1.229 ..P WKT 2010 12 29 12 10 25 31.3200 -97.3300 251.000 457.0 118.557 5.950 -999.990 -999.990 1.186 ..P WKT 2010 12 29 12 10 55 31.3200 -97.3300 251.000 457.0 115.863 5.450 -999.990 -999.990 1.159 ..P WKT 2010 12 29 12 11 25 31.3200 -97.3300 251.000 457.0 117.211 5.440 -999.990 -999.990 1.172 ..P WKT 2010 12 29 12 11 55 31.3200 -97.3300 251.000 457.0 109.667 5.430 -999.990 -999.990 1.097 ..P WKT 2010 12 29 12 12 25 31.3200 -97.3300 251.000 457.0 113.978 6.250 -999.990 -999.990 1.140 ..P WKT 2010 12 29 12 12 55 31.3200 -97.3300 251.000 457.0 115.325 5.720 -999.990 -999.990 1.153 ..P WKT 2010 12 29 12 13 25 31.3200 -97.3300 251.000 457.0 115.865 6.050 -999.990 -999.990 1.159 ..P WKT 2010 12 29 12 13 55 31.3200 -97.3300 251.000 457.0 122.331 5.170 -999.990 -999.990 1.223 ..P WKT 2010 12 29 12 14 25 31.3200 -97.3300 251.000 457.0 118.559 5.080 -999.990 -999.990 1.186 ..P WKT 2010 12 29 12 14 55 31.3200 -97.3300 251.000 457.0 124.216 5.660 -999.990 -999.990 1.242 ..P WKT 2010 12 29 12 19 55 31.3200 -97.3300 251.000 30.0 120.716 5.760 -999.990 -999.990 1.207 ..P WKT 2010 12 29 12 24 55 31.3200 -97.3300 251.000 122.0 120.179 5.240 -999.990 -999.990 1.202 ..P WKT 2010 12 29 12 29 55 31.3200 -97.3300 251.000 457.0 121.259 5.370 -999.990 -999.990 1.213 ..P WKT 2010 12 29 12 34 55 31.3200 -97.3300 251.000 30.0 118.703 5.600 -999.990 -999.990 1.187 ..P WKT 2010 12 29 12 39 55 31.3200 -97.3300 251.000 122.0 116.147 5.180 -999.990 -999.990 1.161 ..P WKT 2010 12 29 12 44 55 31.3200 -97.3300 251.000 457.0 124.495 5.810 -999.990 -999.990 1.245 ..P WKT 2010 12 29 12 54 55 31.3200 -97.3300 251.000 30.0 117.154 5.620 -999.990 -999.990 1.172 ..P WKT 2010 12 29 12 59 55 31.3200 -97.3300 251.000 122.0 116.137 5.160 -999.990 -999.990 1.161 ..P WKT 2010 12 29 13 04 55 31.3200 -97.3300 251.000 457.0 115.525 5.370 -999.990 -999.990 1.155 ..P WKT 2010 12 29 13 09 55 31.3200 -97.3300 251.000 30.0 117.200 5.220 -999.990 -999.990 1.172 ..P WKT 2010 12 29 13 14 55 31.3200 -97.3300 251.000 122.0 112.956 5.690 -999.990 -999.990 1.130 ..P WKT 2010 12 29 13 19 55 31.3200 -97.3300 251.000 457.0 116.647 5.290 -999.990 -999.990 1.166 ..P WKT 2010 12 29 13 29 55 31.3200 -97.3300 251.000 30.0 122.396 5.750 -999.990 -999.990 1.224 ..P WKT 2010 12 29 13 34 55 31.3200 -97.3300 251.000 122.0 122.302 5.370 -999.990 -999.990 1.223 ..P WKT 2010 12 29 13 39 55 31.3200 -97.3300 251.000 457.0 120.997 5.300 -999.990 -999.990 1.210 ..P WKT 2010 12 29 13 44 55 31.3200 -97.3300 251.000 30.0 120.365 5.260 -999.990 -999.990 1.204 ..P WKT 2010 12 29 13 49 55 31.3200 -97.3300 251.000 122.0 123.363 5.450 -999.990 -999.990 1.234 ..P WKT 2010 12 29 13 54 55 31.3200 -97.3300 251.000 457.0 122.731 5.240 -999.990 -999.990 1.227 ..P WKT 2010 12 29 14 04 55 31.3200 -97.3300 251.000 30.0 122.696 5.180 -999.990 -999.990 1.227 ..P WKT 2010 12 29 14 09 55 31.3200 -97.3300 251.000 122.0 121.412 5.040 -999.990 -999.990 1.214 ..P WKT 2010 12 29 14 14 55 31.3200 -97.3300 251.000 457.0 118.650 5.440 -999.990 -999.990 1.187 ..P WKT 2010 12 29 14 19 55 31.3200 -97.3300 251.000 30.0 121.262 5.560 -999.990 -999.990 1.213 ..P WKT 2010 12 29 14 24 55 31.3200 -97.3300 251.000 122.0 124.679 4.910 -999.990 -999.990 1.247 ..P WKT 2010 12 29 14 29 55 31.3200 -97.3300 251.000 457.0 127.827 4.960 -999.990 -999.990 1.278 ..P WKT 2010 12 29 14 39 55 31.3200 -97.3300 251.000 30.0 124.952 5.000 -999.990 -999.990 1.250 ..P WKT 2010 12 29 14 44 55 31.3200 -97.3300 251.000 122.0 127.524 5.770 -999.990 -999.990 1.275 ..P WKT 2010 12 29 14 49 55 31.3200 -97.3300 251.000 457.0 127.141 4.990 -999.990 -999.990 1.271 ..P WKT 2010 12 29 14 54 55 31.3200 -97.3300 251.000 30.0 129.443 4.870 -999.990 -999.990 1.294 ..P WKT 2010 12 29 14 59 55 31.3200 -97.3300 251.000 122.0 126.913 5.220 -999.990 -999.990 1.269 ..P WKT 2010 12 29 15 04 55 31.3200 -97.3300 251.000 457.0 125.726 4.800 -999.990 -999.990 1.257 ..P WKT 2010 12 29 15 14 55 31.3200 -97.3300 251.000 30.0 134.162 5.050 -999.990 -999.990 1.342 ..P WKT 2010 12 29 15 19 55 31.3200 -97.3300 251.000 122.0 132.245 4.710 -999.990 -999.990 1.322 ..P WKT 2010 12 29 15 24 55 31.3200 -97.3300 251.000 457.0 123.625 4.870 -999.990 -999.990 1.236 ..P WKT 2010 12 29 15 29 55 31.3200 -97.3300 251.000 30.0 124.393 4.540 -999.990 -999.990 1.244 ..P WKT 2010 12 29 15 34 55 31.3200 -97.3300 251.000 122.0 124.892 4.510 -999.990 -999.990 1.249 ..P WKT 2010 12 29 15 39 55 31.3200 -97.3300 251.000 457.0 122.978 4.630 -999.990 -999.990 1.230 ..P WKT 2010 12 29 15 49 55 31.3200 -97.3300 251.000 30.0 128.343 6.140 -999.990 -999.990 1.283 ..P WKT 2010 12 29 15 54 55 31.3200 -97.3300 251.000 122.0 131.867 4.360 -999.990 -999.990 1.319 ..P WKT 2010 12 29 15 59 55 31.3200 -97.3300 251.000 457.0 132.443 4.980 -999.990 -999.990 1.324 ..P WKT 2010 12 29 16 04 55 31.3200 -97.3300 251.000 30.0 123.370 4.680 -999.990 -999.990 1.234 ..P WKT 2010 12 29 16 09 55 31.3200 -97.3300 251.000 122.0 129.037 4.070 -999.990 -999.990 1.290 ..P WKT 2010 12 29 16 14 55 31.3200 -97.3300 251.000 457.0 127.200 4.190 -999.990 -999.990 1.272 ..P WKT 2010 12 29 16 24 55 31.3200 -97.3300 251.000 30.0 129.575 6.120 -999.990 -999.990 1.296 ..P WKT 2010 12 29 16 29 55 31.3200 -97.3300 251.000 122.0 124.545 4.520 -999.990 -999.990 1.245 ..P WKT 2010 12 29 16 34 55 31.3200 -97.3300 251.000 457.0 132.102 4.350 -999.990 -999.990 1.321 ..P WKT 2010 12 29 16 39 55 31.3200 -97.3300 251.000 30.0 128.144 5.300 -999.990 -999.990 1.281 ..P WKT 2010 12 29 16 44 55 31.3200 -97.3300 251.000 122.0 137.305 4.570 -999.990 -999.990 1.373 ..P WKT 2010 12 29 16 49 55 31.3200 -97.3300 251.000 457.0 129.064 4.210 -999.990 -999.990 1.291 ..P WKT 2010 12 29 17 04 55 31.3200 -97.3300 251.000 30.0 132.905 4.250 -999.990 -999.990 1.329 ..P WKT 2010 12 29 17 09 55 31.3200 -97.3300 251.000 122.0 125.095 5.180 -999.990 -999.990 1.251 ..P WKT 2010 12 29 17 14 55 31.3200 -97.3300 251.000 457.0 131.467 4.640 -999.990 -999.990 1.315 ..P WKT 2010 12 29 17 19 55 31.3200 -97.3300 251.000 30.0 134.227 4.360 -999.990 -999.990 1.342 ..P WKT 2010 12 29 17 24 55 31.3200 -97.3300 251.000 122.0 130.299 4.550 -999.990 -999.990 1.303 ..P WKT 2010 12 29 17 29 55 31.3200 -97.3300 251.000 457.0 127.708 4.480 -999.990 -999.990 1.277 ..P WKT 2010 12 29 17 39 55 31.3200 -97.3300 251.000 30.0 130.297 4.430 -999.990 -999.990 1.303 ..P WKT 2010 12 29 17 44 55 31.3200 -97.3300 251.000 122.0 130.794 5.370 -999.990 -999.990 1.308 ..P WKT 2010 12 29 17 49 55 31.3200 -97.3300 251.000 457.0 132.762 4.080 -999.990 -999.990 1.328 ..P WKT 2010 12 29 17 54 55 31.3200 -97.3300 251.000 30.0 136.333 4.370 -999.990 -999.990 1.363 ..P WKT 2010 12 29 17 59 55 31.3200 -97.3300 251.000 122.0 131.350 3.800 -999.990 -999.990 1.313 ..P WKT 2010 12 29 18 04 55 31.3200 -97.3300 251.000 457.0 132.115 4.610 -999.990 -999.990 1.321 ..P WKT 2010 12 29 18 14 55 31.3200 -97.3300 251.000 30.0 131.697 3.660 -999.990 -999.990 1.317 ..P WKT 2010 12 29 18 19 55 31.3200 -97.3300 251.000 122.0 132.785 3.920 -999.990 -999.990 1.328 ..P WKT 2010 12 29 18 24 55 31.3200 -97.3300 251.000 457.0 134.408 3.840 -999.990 -999.990 1.344 ..P WKT 2010 12 29 18 29 55 31.3200 -97.3300 251.000 30.0 133.225 4.540 -999.990 -999.990 1.332 ..P WKT 2010 12 29 18 34 55 31.3200 -97.3300 251.000 122.0 134.981 4.140 -999.990 -999.990 1.350 ..P WKT 2010 12 29 18 39 55 31.3200 -97.3300 251.000 457.0 135.668 4.300 -999.990 -999.990 1.357 ..P WKT 2010 12 29 18 49 55 31.3200 -97.3300 251.000 30.0 136.774 4.820 -999.990 -999.990 1.368 ..P WKT 2010 12 29 18 54 55 31.3200 -97.3300 251.000 122.0 145.470 4.680 -999.990 -999.990 1.455 ..P WKT 2010 12 29 18 59 55 31.3200 -97.3300 251.000 457.0 138.948 4.520 -999.990 -999.990 1.389 ..P WKT 2010 12 29 19 04 55 31.3200 -97.3300 251.000 30.0 133.229 4.480 -999.990 -999.990 1.332 ..P WKT 2010 12 29 19 09 55 31.3200 -97.3300 251.000 122.0 129.379 4.110 -999.990 -999.990 1.294 ..P WKT 2010 12 29 19 14 55 31.3200 -97.3300 251.000 457.0 133.535 4.400 -999.990 -999.990 1.335 ..P WKT 2010 12 29 19 24 55 31.3200 -97.3300 251.000 30.0 131.021 4.940 -999.990 -999.990 1.310 ..P WKT 2010 12 29 19 29 55 31.3200 -97.3300 251.000 122.0 136.890 3.990 -999.990 -999.990 1.369 ..P WKT 2010 12 29 19 34 55 31.3200 -97.3300 251.000 457.0 131.556 4.020 -999.990 -999.990 1.316 ..P WKT 2010 12 29 19 39 55 31.3200 -97.3300 251.000 30.0 133.957 3.840 -999.990 -999.990 1.340 ..P WKT 2010 12 29 19 44 55 31.3200 -97.3300 251.000 122.0 133.957 3.630 -999.990 -999.990 1.340 ..P WKT 2010 12 29 19 49 55 31.3200 -97.3300 251.000 457.0 131.824 3.510 -999.990 -999.990 1.318 ..P WKT 2010 12 29 19 59 55 31.3200 -97.3300 251.000 30.0 135.044 4.970 -999.990 -999.990 1.350 ..P WKT 2010 12 29 20 04 55 31.3200 -97.3300 251.000 122.0 135.329 4.180 -999.990 -999.990 1.353 ..P WKT 2010 12 29 20 09 55 31.3200 -97.3300 251.000 457.0 134.550 3.690 -999.990 -999.990 1.346 ..P WKT 2010 12 29 20 14 55 31.3200 -97.3300 251.000 30.0 136.434 4.630 -999.990 -999.990 1.364 ..P WKT 2010 12 29 20 19 55 31.3200 -97.3300 251.000 122.0 138.585 4.540 -999.990 -999.990 1.386 ..P WKT 2010 12 29 20 24 55 31.3200 -97.3300 251.000 457.0 137.938 4.730 -999.990 -999.990 1.379 ..P WKT 2010 12 29 20 34 55 31.3200 -97.3300 251.000 30.0 136.854 4.680 -999.990 -999.990 1.369 ..P WKT 2010 12 29 20 39 55 31.3200 -97.3300 251.000 122.0 141.210 4.740 -999.990 -999.990 1.412 ..P WKT 2010 12 29 20 44 55 31.3200 -97.3300 251.000 457.0 136.512 4.250 -999.990 -999.990 1.365 ..P WKT 2010 12 29 20 49 55 31.3200 -97.3300 251.000 30.0 137.273 4.400 -999.990 -999.990 1.373 ..P WKT 2010 12 29 20 54 55 31.3200 -97.3300 251.000 122.0 141.627 3.870 -999.990 -999.990 1.416 ..P WKT 2010 12 29 20 59 55 31.3200 -97.3300 251.000 457.0 133.337 3.490 -999.990 -999.990 1.333 ..P WKT 2010 12 29 21 09 55 31.3200 -97.3300 251.000 30.0 127.141 3.780 -999.990 -999.990 1.271 ..P WKT 2010 12 29 21 14 55 31.3200 -97.3300 251.000 122.0 136.551 3.490 -999.990 -999.990 1.366 ..P WKT 2010 12 29 21 19 55 31.3200 -97.3300 251.000 457.0 133.187 4.410 -999.990 -999.990 1.332 ..P WKT 2010 12 29 21 24 55 31.3200 -97.3300 251.000 30.0 134.081 4.580 -999.990 -999.990 1.341 ..P WKT 2010 12 29 21 29 55 31.3200 -97.3300 251.000 122.0 136.171 4.960 -999.990 -999.990 1.362 ..P WKT 2010 12 29 21 34 55 31.3200 -97.3300 251.000 457.0 132.543 3.590 -999.990 -999.990 1.325 ..P WKT 2010 12 29 21 44 55 31.3200 -97.3300 251.000 30.0 134.405 3.600 -999.990 -999.990 1.344 ..P WKT 2010 12 29 21 49 55 31.3200 -97.3300 251.000 122.0 132.184 4.390 -999.990 -999.990 1.322 ..P WKT 2010 12 29 21 54 55 31.3200 -97.3300 251.000 457.0 138.204 4.610 -999.990 -999.990 1.382 ..P WKT 2010 12 29 21 59 55 31.3200 -97.3300 251.000 30.0 132.261 4.510 -999.990 -999.990 1.323 ..P WKT 2010 12 29 22 04 55 31.3200 -97.3300 251.000 122.0 130.041 4.300 -999.990 -999.990 1.300 ..P WKT 2010 12 29 22 09 55 31.3200 -97.3300 251.000 457.0 142.969 4.030 -999.990 -999.990 1.430 ..P WKT 2010 12 29 22 19 55 31.3200 -97.3300 251.000 30.0 138.223 4.490 -999.990 -999.990 1.382 ..P WKT 2010 12 29 22 24 55 31.3200 -97.3300 251.000 122.0 135.965 4.130 -999.990 -999.990 1.360 ..P WKT 2010 12 29 22 29 55 31.3200 -97.3300 251.000 457.0 140.614 5.480 -999.990 -999.990 1.406 ..P WKT 2010 12 29 22 34 55 31.3200 -97.3300 251.000 30.0 133.310 4.400 -999.990 -999.990 1.333 ..P WKT 2010 12 29 22 39 55 31.3200 -97.3300 251.000 122.0 141.942 3.280 -999.990 -999.990 1.419 ..P WKT 2010 12 29 22 44 55 31.3200 -97.3300 251.000 457.0 144.464 3.610 -999.990 -999.990 1.445 ..P WKT 2010 12 29 22 54 55 31.3200 -97.3300 251.000 30.0 142.888 3.340 -999.990 -999.990 1.429 ..P WKT 2010 12 29 22 59 55 31.3200 -97.3300 251.000 122.0 140.385 3.150 -999.990 -999.990 1.404 ..P WKT 2010 12 29 23 04 55 31.3200 -97.3300 251.000 457.0 139.740 3.260 -999.990 -999.990 1.397 ..P WKT 2010 12 29 23 09 55 31.3200 -97.3300 251.000 30.0 142.015 3.780 -999.990 -999.990 1.420 ..P WKT 2010 12 29 23 14 55 31.3200 -97.3300 251.000 122.0 146.412 4.040 -999.990 -999.990 1.464 ..P WKT 2010 12 29 23 19 55 31.3200 -97.3300 251.000 457.0 135.949 4.010 -999.990 -999.990 1.359 ..P WKT 2010 12 29 23 29 55 31.3200 -97.3300 251.000 30.0 152.217 3.880 -999.990 -999.990 1.522 ..P WKT 2010 12 29 23 34 55 31.3200 -97.3300 251.000 122.0 157.188 3.670 -999.990 -999.990 1.572 ..P WKT 2010 12 29 23 39 55 31.3200 -97.3300 251.000 457.0 138.555 3.790 -999.990 -999.990 1.386 ..P WKT 2010 12 29 23 44 55 31.3200 -97.3300 251.000 30.0 145.914 4.720 -999.990 -999.990 1.459 ..P WKT 2010 12 29 23 49 55 31.3200 -97.3300 251.000 122.0 147.438 3.660 -999.990 -999.990 1.474 ..P WKT 2010 12 30 00 09 55 31.3200 -97.3300 251.000 457.0 144.581 3.610 -999.990 -999.990 1.446 ..P WKT 2010 12 30 00 10 25 31.3200 -97.3300 251.000 457.0 141.638 3.440 -999.990 -999.990 1.416 ..P WKT 2010 12 30 00 10 55 31.3200 -97.3300 251.000 457.0 146.119 3.510 -999.990 -999.990 1.461 ..P WKT 2010 12 30 00 11 25 31.3200 -97.3300 251.000 457.0 144.237 3.080 -999.990 -999.990 1.442 ..P WKT 2010 12 30 00 11 55 31.3200 -97.3300 251.000 457.0 147.658 4.290 -999.990 -999.990 1.477 ..P WKT 2010 12 30 00 12 25 31.3200 -97.3300 251.000 457.0 142.329 3.930 -999.990 -999.990 1.423 ..P WKT 2010 12 30 00 12 55 31.3200 -97.3300 251.000 457.0 144.954 4.260 -999.990 -999.990 1.450 ..P WKT 2010 12 30 00 13 25 31.3200 -97.3300 251.000 457.0 144.663 3.740 -999.990 -999.990 1.447 ..P WKT 2010 12 30 00 13 55 31.3200 -97.3300 251.000 457.0 140.924 3.370 -999.990 -999.990 1.409 ..P WKT 2010 12 30 00 14 25 31.3200 -97.3300 251.000 457.0 141.826 3.150 -999.990 -999.990 1.418 ..P WKT 2010 12 30 00 14 55 31.3200 -97.3300 251.000 457.0 141.933 3.340 -999.990 -999.990 1.419 ..P WKT 2010 12 30 00 19 55 31.3200 -97.3300 251.000 30.0 137.694 6.420 -999.990 -999.990 1.377 ..P WKT 2010 12 30 00 24 55 31.3200 -97.3300 251.000 122.0 141.939 3.330 -999.990 -999.990 1.419 ..P WKT 2010 12 30 00 29 55 31.3200 -97.3300 251.000 457.0 143.535 3.690 -999.990 -999.990 1.435 ..P WKT 2010 12 30 00 34 55 31.3200 -97.3300 251.000 30.0 140.090 3.600 -999.990 -999.990 1.401 ..P WKT 2010 12 30 00 39 55 31.3200 -97.3300 251.000 122.0 134.523 4.560 -999.990 -999.990 1.345 ..P WKT 2010 12 30 00 44 55 31.3200 -97.3300 251.000 457.0 147.126 4.060 -999.990 -999.990 1.471 ..P WKT 2010 12 30 00 54 55 31.3200 -97.3300 251.000 30.0 130.080 4.470 -999.990 -999.990 1.301 ..P WKT 2010 12 30 00 59 55 31.3200 -97.3300 251.000 122.0 130.139 4.040 -999.990 -999.990 1.301 ..P WKT 2010 12 30 01 04 55 31.3200 -97.3300 251.000 457.0 152.618 3.900 -999.990 -999.990 1.526 ..P WKT 2010 12 30 01 09 55 31.3200 -97.3300 251.000 30.0 129.727 3.700 -999.990 -999.990 1.297 ..P WKT 2010 12 30 01 14 55 31.3200 -97.3300 251.000 122.0 131.777 3.400 -999.990 -999.990 1.318 ..P WKT 2010 12 30 01 19 55 31.3200 -97.3300 251.000 457.0 152.137 4.390 -999.990 -999.990 1.521 ..P WKT 2010 12 30 01 29 55 31.3200 -97.3300 251.000 30.0 130.610 4.120 -999.990 -999.990 1.306 ..P WKT 2010 12 30 01 34 55 31.3200 -97.3300 251.000 122.0 131.580 3.330 -999.990 -999.990 1.316 ..P WKT 2010 12 30 01 39 55 31.3200 -97.3300 251.000 457.0 158.430 4.830 -999.990 -999.990 1.584 ..P WKT 2010 12 30 01 44 55 31.3200 -97.3300 251.000 30.0 125.423 4.670 -999.990 -999.990 1.254 ..P WKT 2010 12 30 01 49 55 31.3200 -97.3300 251.000 122.0 129.578 3.760 -999.990 -999.990 1.296 ..P WKT 2010 12 30 01 54 55 31.3200 -97.3300 251.000 457.0 168.379 5.480 -999.990 -999.990 1.684 ..P WKT 2010 12 30 02 04 55 31.3200 -97.3300 251.000 30.0 124.010 4.220 -999.990 -999.990 1.240 ..P WKT 2010 12 30 02 09 55 31.3200 -97.3300 251.000 122.0 127.521 3.470 -999.990 -999.990 1.275 ..P WKT 2010 12 30 02 14 55 31.3200 -97.3300 251.000 457.0 160.111 3.420 -999.990 -999.990 1.601 ..P WKT 2010 12 30 02 19 55 31.3200 -97.3300 251.000 30.0 128.569 3.820 -999.990 -999.990 1.286 ..P WKT 2010 12 30 02 24 55 31.3200 -97.3300 251.000 122.0 121.989 3.700 -999.990 -999.990 1.220 ..P WKT 2010 12 30 02 29 55 31.3200 -97.3300 251.000 457.0 150.999 3.140 -999.990 -999.990 1.510 ..P WKT 2010 12 30 02 39 55 31.3200 -97.3300 251.000 30.0 124.310 2.960 -999.990 -999.990 1.243 ..P WKT 2010 12 30 02 44 55 31.3200 -97.3300 251.000 122.0 130.232 3.450 -999.990 -999.990 1.302 ..P WKT 2010 12 30 02 49 55 31.3200 -97.3300 251.000 457.0 152.628 4.450 -999.990 -999.990 1.526 ..P WKT 2010 12 30 02 54 55 31.3200 -97.3300 251.000 30.0 135.704 3.610 -999.990 -999.990 1.357 ..P WKT 2010 12 30 02 59 55 31.3200 -97.3300 251.000 122.0 131.265 4.010 -999.990 -999.990 1.313 ..P WKT 2010 12 30 03 04 55 31.3200 -97.3300 251.000 457.0 156.057 3.530 -999.990 -999.990 1.561 ..P WKT 2010 12 30 03 14 55 31.3200 -97.3300 251.000 30.0 131.692 3.160 -999.990 -999.990 1.317 ..P WKT 2010 12 30 03 19 55 31.3200 -97.3300 251.000 122.0 140.199 3.240 -999.990 -999.990 1.402 ..P WKT 2010 12 30 03 24 55 31.3200 -97.3300 251.000 457.0 157.745 4.210 -999.990 -999.990 1.577 ..P WKT 2010 12 30 03 29 55 31.3200 -97.3300 251.000 30.0 132.231 4.300 -999.990 -999.990 1.322 ..P WKT 2010 12 30 03 34 55 31.3200 -97.3300 251.000 122.0 141.006 3.590 -999.990 -999.990 1.410 ..P WKT 2010 12 30 03 39 55 31.3200 -97.3300 251.000 457.0 169.455 4.050 -999.990 -999.990 1.695 ..P WKT 2010 12 30 03 49 55 31.3200 -97.3300 251.000 30.0 141.339 3.340 -999.990 -999.990 1.413 ..P WKT 2010 12 30 03 54 55 31.3200 -97.3300 251.000 122.0 137.943 3.470 -999.990 -999.990 1.379 ..P WKT 2010 12 30 03 59 55 31.3200 -97.3300 251.000 457.0 150.767 3.710 -999.990 -999.990 1.508 ..P WKT 2010 12 30 04 04 55 31.3200 -97.3300 251.000 30.0 131.947 4.950 -999.990 -999.990 1.319 ..P WKT 2010 12 30 04 09 55 31.3200 -97.3300 251.000 122.0 139.985 4.210 -999.990 -999.990 1.400 ..P WKT 2010 12 30 04 14 55 31.3200 -97.3300 251.000 457.0 142.971 4.240 -999.990 -999.990 1.430 ..P WKT 2010 12 30 04 24 55 31.3200 -97.3300 251.000 30.0 137.810 4.000 -999.990 -999.990 1.378 ..P WKT 2010 12 30 04 29 55 31.3200 -97.3300 251.000 122.0 138.440 4.420 -999.990 -999.990 1.384 ..P WKT 2010 12 30 04 34 55 31.3200 -97.3300 251.000 457.0 140.533 4.910 -999.990 -999.990 1.405 ..P WKT 2010 12 30 04 39 55 31.3200 -97.3300 251.000 30.0 135.577 4.420 -999.990 -999.990 1.356 ..P WKT 2010 12 30 04 44 55 31.3200 -97.3300 251.000 122.0 139.533 4.400 -999.990 -999.990 1.395 ..P WKT 2010 12 30 04 49 55 31.3200 -97.3300 251.000 457.0 138.300 3.360 -999.990 -999.990 1.383 ..P WKT 2010 12 30 05 04 55 31.3200 -97.3300 251.000 30.0 134.680 3.830 -999.990 -999.990 1.347 ..P WKT 2010 12 30 05 09 55 31.3200 -97.3300 251.000 122.0 136.612 3.630 -999.990 -999.990 1.366 ..P WKT 2010 12 30 05 14 55 31.3200 -97.3300 251.000 457.0 138.145 5.120 -999.990 -999.990 1.381 ..P WKT 2010 12 30 05 19 55 31.3200 -97.3300 251.000 30.0 135.952 4.890 -999.990 -999.990 1.360 ..P WKT 2010 12 30 05 24 55 31.3200 -97.3300 251.000 122.0 140.947 5.890 -999.990 -999.990 1.409 ..P WKT 2010 12 30 05 29 55 31.3200 -97.3300 251.000 457.0 138.089 5.130 -999.990 -999.990 1.381 ..P WKT 2010 12 30 05 39 55 31.3200 -97.3300 251.000 30.0 137.438 3.930 -999.990 -999.990 1.374 ..P WKT 2010 12 30 05 44 55 31.3200 -97.3300 251.000 122.0 140.580 4.010 -999.990 -999.990 1.406 ..P WKT 2010 12 30 05 49 55 31.3200 -97.3300 251.000 457.0 146.251 5.600 -999.990 -999.990 1.463 ..P WKT 2010 12 30 05 54 55 31.3200 -97.3300 251.000 30.0 144.068 6.900 -999.990 -999.990 1.441 ..P WKT 2010 12 30 05 59 55 31.3200 -97.3300 251.000 122.0 147.610 6.130 -999.990 -999.990 1.476 ..P WKT 2010 12 30 06 04 55 31.3200 -97.3300 251.000 457.0 147.557 6.020 -999.990 -999.990 1.476 ..P WKT 2010 12 30 06 14 55 31.3200 -97.3300 251.000 30.0 148.002 6.350 -999.990 -999.990 1.480 ..P WKT 2010 12 30 06 19 55 31.3200 -97.3300 251.000 122.0 146.902 5.950 -999.990 -999.990 1.469 ..P WKT 2010 12 30 06 24 55 31.3200 -97.3300 251.000 457.0 142.339 7.800 -999.990 -999.990 1.423 ..P WKT 2010 12 30 06 29 55 31.3200 -97.3300 251.000 30.0 146.566 5.540 -999.990 -999.990 1.466 ..P WKT 2010 12 30 06 34 55 31.3200 -97.3300 251.000 122.0 146.532 4.730 -999.990 -999.990 1.465 ..P WKT 2010 12 30 06 39 55 31.3200 -97.3300 251.000 457.0 140.636 4.430 -999.990 -999.990 1.406 ..P WKT 2010 12 30 06 49 55 31.3200 -97.3300 251.000 30.0 142.431 4.800 -999.990 -999.990 1.424 ..P WKT 2010 12 30 06 54 55 31.3200 -97.3300 251.000 122.0 146.395 4.010 -999.990 -999.990 1.464 ..P WKT 2010 12 30 06 59 55 31.3200 -97.3300 251.000 457.0 135.433 4.140 -999.990 -999.990 1.354 ..P WKT 2010 12 30 07 04 55 31.3200 -97.3300 251.000 30.0 137.797 4.330 -999.990 -999.990 1.378 ..P WKT 2010 12 30 07 09 55 31.3200 -97.3300 251.000 122.0 140.961 4.010 -999.990 -999.990 1.410 ..P WKT 2010 12 30 07 14 55 31.3200 -97.3300 251.000 457.0 132.129 3.690 -999.990 -999.990 1.321 ..P WKT 2010 12 30 07 24 55 31.3200 -97.3300 251.000 30.0 138.724 4.020 -999.990 -999.990 1.387 ..P WKT 2010 12 30 07 29 55 31.3200 -97.3300 251.000 122.0 138.956 4.650 -999.990 -999.990 1.390 ..P WKT 2010 12 30 07 34 55 31.3200 -97.3300 251.000 457.0 130.121 3.640 -999.990 -999.990 1.301 ..P WKT 2010 12 30 07 39 55 31.3200 -97.3300 251.000 30.0 139.686 3.880 -999.990 -999.990 1.397 ..P WKT 2010 12 30 07 44 55 31.3200 -97.3300 251.000 122.0 143.918 3.830 -999.990 -999.990 1.439 ..P WKT 2010 12 30 07 49 55 31.3200 -97.3300 251.000 457.0 142.550 4.380 -999.990 -999.990 1.426 ..P WKT 2010 12 30 07 59 55 31.3200 -97.3300 251.000 30.0 140.270 4.500 -999.990 -999.990 1.403 ..P WKT 2010 12 30 08 04 55 31.3200 -97.3300 251.000 122.0 142.560 3.810 -999.990 -999.990 1.426 ..P WKT 2010 12 30 08 09 55 31.3200 -97.3300 251.000 457.0 146.717 4.230 -999.990 -999.990 1.467 ..P WKT 2010 12 30 08 14 55 31.3200 -97.3300 251.000 30.0 139.404 3.560 -999.990 -999.990 1.394 ..P WKT 2010 12 30 08 19 55 31.3200 -97.3300 251.000 122.0 142.628 3.590 -999.990 -999.990 1.426 ..P WKT 2010 12 30 08 24 55 31.3200 -97.3300 251.000 457.0 148.520 3.590 -999.990 -999.990 1.485 ..P WKT 2010 12 30 08 34 55 31.3200 -97.3300 251.000 30.0 147.175 3.460 -999.990 -999.990 1.472 ..P WKT 2010 12 30 08 39 55 31.3200 -97.3300 251.000 122.0 155.013 3.740 -999.990 -999.990 1.550 ..P WKT 2010 12 30 08 44 55 31.3200 -97.3300 251.000 457.0 151.243 3.310 -999.990 -999.990 1.512 ..P WKT 2010 12 30 08 49 55 31.3200 -97.3300 251.000 30.0 157.614 5.020 -999.990 -999.990 1.576 ..P WKT 2010 12 30 08 54 55 31.3200 -97.3300 251.000 122.0 150.640 3.780 -999.990 -999.990 1.506 ..P WKT 2010 12 30 08 59 55 31.3200 -97.3300 251.000 457.0 150.874 3.700 -999.990 -999.990 1.509 ..P WKT 2010 12 30 09 09 55 31.3200 -97.3300 251.000 30.0 142.834 3.450 -999.990 -999.990 1.428 ..P WKT 2010 12 30 09 14 55 31.3200 -97.3300 251.000 122.0 141.903 4.320 -999.990 -999.990 1.419 ..P WKT 2010 12 30 09 19 55 31.3200 -97.3300 251.000 457.0 143.909 3.500 -999.990 -999.990 1.439 ..P WKT 2010 12 30 09 24 55 31.3200 -97.3300 251.000 30.0 150.321 4.230 -999.990 -999.990 1.503 ..P WKT 2010 12 30 09 29 55 31.3200 -97.3300 251.000 122.0 148.723 3.970 -999.990 -999.990 1.487 ..P WKT 2010 12 30 09 34 55 31.3200 -97.3300 251.000 457.0 142.852 3.680 -999.990 -999.990 1.429 ..P WKT 2010 12 30 09 44 55 31.3200 -97.3300 251.000 30.0 153.657 3.900 -999.990 -999.990 1.537 ..P WKT 2010 12 30 09 49 55 31.3200 -97.3300 251.000 122.0 152.573 5.270 -999.990 -999.990 1.526 ..P WKT 2010 12 30 09 54 55 31.3200 -97.3300 251.000 457.0 150.555 4.130 -999.990 -999.990 1.506 ..P WKT 2010 12 30 09 59 55 31.3200 -97.3300 251.000 30.0 155.215 4.600 -999.990 -999.990 1.552 ..P WKT 2010 12 30 10 04 55 31.3200 -97.3300 251.000 122.0 148.521 4.740 -999.990 -999.990 1.485 ..P WKT 2010 12 30 10 09 55 31.3200 -97.3300 251.000 457.0 155.720 6.270 -999.990 -999.990 1.557 ..P WKT 2010 12 30 10 19 55 31.3200 -97.3300 251.000 30.0 153.152 4.840 -999.990 -999.990 1.532 ..P WKT 2010 12 30 10 24 55 31.3200 -97.3300 251.000 122.0 154.606 4.690 -999.990 -999.990 1.546 ..P WKT 2010 12 30 10 29 55 31.3200 -97.3300 251.000 457.0 154.458 4.510 -999.990 -999.990 1.545 ..P WKT 2010 12 30 10 34 55 31.3200 -97.3300 251.000 30.0 151.904 3.930 -999.990 -999.990 1.519 ..P WKT 2010 12 30 10 39 55 31.3200 -97.3300 251.000 122.0 151.755 3.950 -999.990 -999.990 1.518 ..P WKT 2010 12 30 10 44 55 31.3200 -97.3300 251.000 457.0 156.151 3.950 -999.990 -999.990 1.562 ..P WKT 2010 12 30 10 54 55 31.3200 -97.3300 251.000 30.0 150.202 4.540 -999.990 -999.990 1.502 ..P WKT 2010 12 30 10 59 55 31.3200 -97.3300 251.000 122.0 154.292 4.030 -999.990 -999.990 1.543 ..P WKT 2010 12 30 11 04 55 31.3200 -97.3300 251.000 457.0 152.234 3.530 -999.990 -999.990 1.522 ..P WKT 2010 12 30 11 09 55 31.3200 -97.3300 251.000 30.0 151.513 4.400 -999.990 -999.990 1.515 ..P WKT 2010 12 30 11 14 55 31.3200 -97.3300 251.000 122.0 145.443 3.590 -999.990 -999.990 1.454 ..P WKT 2010 12 30 11 19 55 31.3200 -97.3300 251.000 457.0 150.871 4.800 -999.990 -999.990 1.509 ..P WKT 2010 12 30 11 29 55 31.3200 -97.3300 251.000 30.0 151.875 4.730 -999.990 -999.990 1.519 ..P WKT 2010 12 30 11 34 55 31.3200 -97.3300 251.000 122.0 144.507 4.650 -999.990 -999.990 1.445 ..P WKT 2010 12 30 11 39 55 31.3200 -97.3300 251.000 457.0 140.883 4.060 -999.990 -999.990 1.409 ..P WKT 2010 12 30 11 44 55 31.3200 -97.3300 251.000 30.0 147.156 4.580 -999.990 -999.990 1.472 ..P WKT 2010 12 30 11 49 55 31.3200 -97.3300 251.000 122.0 152.894 4.720 -999.990 -999.990 1.529 ..P WKT 2010 12 30 12 09 55 31.3200 -97.3300 251.000 457.0 141.671 4.980 -999.990 -999.990 1.417 ..P WKT 2010 12 30 12 10 25 31.3200 -97.3300 251.000 457.0 143.443 5.330 -999.990 -999.990 1.434 ..P WKT 2010 12 30 12 10 55 31.3200 -97.3300 251.000 457.0 145.081 4.980 -999.990 -999.990 1.451 ..P WKT 2010 12 30 12 11 25 31.3200 -97.3300 251.000 457.0 142.437 5.770 -999.990 -999.990 1.424 ..P WKT 2010 12 30 12 11 55 31.3200 -97.3300 251.000 457.0 141.935 5.550 -999.990 -999.990 1.419 ..P WKT 2010 12 30 12 12 25 31.3200 -97.3300 251.000 457.0 146.383 5.690 -999.990 -999.990 1.464 ..P WKT 2010 12 30 12 12 55 31.3200 -97.3300 251.000 457.0 140.528 5.170 -999.990 -999.990 1.405 ..P WKT 2010 12 30 12 13 25 31.3200 -97.3300 251.000 457.0 143.103 5.000 -999.990 -999.990 1.431 ..P WKT 2010 12 30 12 13 55 31.3200 -97.3300 251.000 457.0 145.276 5.180 -999.990 -999.990 1.453 ..P WKT 2010 12 30 12 14 25 31.3200 -97.3300 251.000 457.0 144.105 4.850 -999.990 -999.990 1.441 ..P WKT 2010 12 30 12 14 55 31.3200 -97.3300 251.000 457.0 140.257 5.120 -999.990 -999.990 1.403 ..P WKT 2010 12 30 12 19 55 31.3200 -97.3300 251.000 30.0 146.736 4.620 -999.990 -999.990 1.467 ..P WKT 2010 12 30 12 24 55 31.3200 -97.3300 251.000 122.0 147.998 5.360 -999.990 -999.990 1.480 ..P WKT 2010 12 30 12 29 55 31.3200 -97.3300 251.000 457.0 147.922 4.630 -999.990 -999.990 1.479 ..P WKT 2010 12 30 12 34 55 31.3200 -97.3300 251.000 30.0 155.070 4.330 -999.990 -999.990 1.551 ..P WKT 2010 12 30 12 39 55 31.3200 -97.3300 251.000 122.0 147.903 3.970 -999.990 -999.990 1.479 ..P WKT 2010 12 30 12 44 55 31.3200 -97.3300 251.000 457.0 148.095 4.230 -999.990 -999.990 1.481 ..P WKT 2010 12 30 12 54 55 31.3200 -97.3300 251.000 30.0 158.261 3.970 -999.990 -999.990 1.583 ..P WKT 2010 12 30 12 59 55 31.3200 -97.3300 251.000 122.0 159.272 4.310 -999.990 -999.990 1.593 ..P WKT 2010 12 30 13 04 55 31.3200 -97.3300 251.000 457.0 147.707 4.440 -999.990 -999.990 1.477 ..P WKT 2010 12 30 13 09 55 31.3200 -97.3300 251.000 30.0 154.738 4.320 -999.990 -999.990 1.547 ..P WKT 2010 12 30 13 14 55 31.3200 -97.3300 251.000 122.0 149.461 4.460 -999.990 -999.990 1.495 ..P WKT 2010 12 30 13 19 55 31.3200 -97.3300 251.000 457.0 153.415 4.370 -999.990 -999.990 1.534 ..P WKT 2010 12 30 13 29 55 31.3200 -97.3300 251.000 30.0 155.973 4.200 -999.990 -999.990 1.560 ..P WKT 2010 12 30 13 34 55 31.3200 -97.3300 251.000 122.0 157.252 4.640 -999.990 -999.990 1.573 ..P WKT 2010 12 30 13 39 55 31.3200 -97.3300 251.000 457.0 149.299 4.420 -999.990 -999.990 1.493 ..P WKT 2010 12 30 13 44 55 31.3200 -97.3300 251.000 30.0 159.542 4.120 -999.990 -999.990 1.595 ..P WKT 2010 12 30 13 49 55 31.3200 -97.3300 251.000 122.0 160.954 4.170 -999.990 -999.990 1.610 ..P WKT 2010 12 30 13 54 55 31.3200 -97.3300 251.000 457.0 155.677 3.980 -999.990 -999.990 1.557 ..P WKT 2010 12 30 14 04 55 31.3200 -97.3300 251.000 30.0 150.245 4.950 -999.990 -999.990 1.502 ..P WKT 2010 12 30 14 09 55 31.3200 -97.3300 251.000 122.0 155.174 3.820 -999.990 -999.990 1.552 ..P WKT 2010 12 30 14 14 55 31.3200 -97.3300 251.000 457.0 153.681 4.000 -999.990 -999.990 1.537 ..P WKT 2010 12 30 14 19 55 31.3200 -97.3300 251.000 30.0 152.189 4.180 -999.990 -999.990 1.522 ..P WKT 2010 12 30 14 24 55 31.3200 -97.3300 251.000 122.0 158.456 4.150 -999.990 -999.990 1.585 ..P WKT 2010 12 30 14 29 55 31.3200 -97.3300 251.000 457.0 148.132 4.290 -999.990 -999.990 1.481 ..P WKT 2010 12 30 14 39 55 31.3200 -97.3300 251.000 30.0 156.348 3.930 -999.990 -999.990 1.563 ..P WKT 2010 12 30 14 44 55 31.3200 -97.3300 251.000 122.0 159.099 4.170 -999.990 -999.990 1.591 ..P WKT 2010 12 30 14 49 55 31.3200 -97.3300 251.000 457.0 154.356 4.710 -999.990 -999.990 1.544 ..P WKT 2010 12 30 14 54 55 31.3200 -97.3300 251.000 30.0 158.445 4.450 -999.990 -999.990 1.584 ..P WKT 2010 12 30 14 59 55 31.3200 -97.3300 251.000 122.0 154.773 3.780 -999.990 -999.990 1.548 ..P WKT 2010 12 30 15 04 55 31.3200 -97.3300 251.000 457.0 151.101 3.850 -999.990 -999.990 1.511 ..P WKT 2010 12 30 15 14 55 31.3200 -97.3300 251.000 30.0 154.920 4.020 -999.990 -999.990 1.549 ..P WKT 2010 12 30 15 19 55 31.3200 -97.3300 251.000 122.0 162.412 5.320 -999.990 -999.990 1.624 ..P WKT 2010 12 30 15 24 55 31.3200 -97.3300 251.000 457.0 157.860 3.810 -999.990 -999.990 1.579 ..P WKT 2010 12 30 15 29 55 31.3200 -97.3300 251.000 30.0 153.309 4.030 -999.990 -999.990 1.533 ..P WKT 2010 12 30 15 34 55 31.3200 -97.3300 251.000 122.0 154.913 4.200 -999.990 -999.990 1.549 ..P WKT 2010 12 30 15 39 55 31.3200 -97.3300 251.000 457.0 153.037 3.680 -999.990 -999.990 1.530 ..P WKT 2010 12 30 15 49 55 31.3200 -97.3300 251.000 30.0 160.833 4.790 -999.990 -999.990 1.608 ..P WKT 2010 12 30 15 54 55 31.3200 -97.3300 251.000 122.0 156.454 4.800 -999.990 -999.990 1.565 ..P WKT 2010 12 30 15 59 55 31.3200 -97.3300 251.000 457.0 153.144 4.820 -999.990 -999.990 1.531 ..P WKT 2010 12 30 16 04 55 31.3200 -97.3300 251.000 30.0 148.230 4.620 -999.990 -999.990 1.482 ..P WKT 2010 12 30 16 09 55 31.3200 -97.3300 251.000 122.0 152.950 4.970 -999.990 -999.990 1.529 ..P WKT 2010 12 30 16 14 55 31.3200 -97.3300 251.000 457.0 152.183 5.160 -999.990 -999.990 1.522 ..P WKT 2010 12 30 16 24 55 31.3200 -97.3300 251.000 30.0 151.817 4.810 -999.990 -999.990 1.518 ..P WKT 2010 12 30 16 29 55 31.3200 -97.3300 251.000 122.0 153.420 4.380 -999.990 -999.990 1.534 ..P WKT 2010 12 30 16 34 55 31.3200 -97.3300 251.000 457.0 144.988 4.740 -999.990 -999.990 1.450 ..P WKT 2010 12 30 16 39 55 31.3200 -97.3300 251.000 30.0 151.008 3.990 -999.990 -999.990 1.510 ..P WKT 2010 12 30 16 44 55 31.3200 -97.3300 251.000 122.0 155.288 4.450 -999.990 -999.990 1.553 ..P WKT 2010 12 30 16 49 55 31.3200 -97.3300 251.000 457.0 148.595 4.230 -999.990 -999.990 1.486 ..P WKT 2010 12 30 17 04 55 31.3200 -97.3300 251.000 30.0 147.084 4.780 -999.990 -999.990 1.471 ..P WKT 2010 12 30 17 09 55 31.3200 -97.3300 251.000 122.0 147.935 3.850 -999.990 -999.990 1.479 ..P WKT 2010 12 30 17 14 55 31.3200 -97.3300 251.000 457.0 145.708 4.290 -999.990 -999.990 1.457 ..P WKT 2010 12 30 17 19 55 31.3200 -97.3300 251.000 30.0 144.150 4.070 -999.990 -999.990 1.442 ..P WKT 2010 12 30 17 24 55 31.3200 -97.3300 251.000 122.0 155.172 4.580 -999.990 -999.990 1.552 ..P WKT 2010 12 30 17 29 55 31.3200 -97.3300 251.000 457.0 145.986 4.040 -999.990 -999.990 1.460 ..P WKT 2010 12 30 17 39 55 31.3200 -97.3300 251.000 30.0 149.704 3.970 -999.990 -999.990 1.497 ..P WKT 2010 12 30 17 44 55 31.3200 -97.3300 251.000 122.0 148.554 4.130 -999.990 -999.990 1.486 ..P WKT 2010 12 30 17 49 55 31.3200 -97.3300 251.000 457.0 149.547 4.120 -999.990 -999.990 1.495 ..P WKT 2010 12 30 17 54 55 31.3200 -97.3300 251.000 30.0 146.792 4.390 -999.990 -999.990 1.468 ..P WKT 2010 12 30 17 59 55 31.3200 -97.3300 251.000 122.0 153.406 5.050 -999.990 -999.990 1.534 ..P WKT 2010 12 30 18 04 55 31.3200 -97.3300 251.000 457.0 150.115 5.320 -999.990 -999.990 1.501 ..P WKT 2010 12 30 18 14 55 31.3200 -97.3300 251.000 30.0 146.058 5.040 -999.990 -999.990 1.461 ..P WKT 2010 12 30 18 19 55 31.3200 -97.3300 251.000 122.0 148.503 4.870 -999.990 -999.990 1.485 ..P WKT 2010 12 30 18 24 55 31.3200 -97.3300 251.000 457.0 148.540 5.280 -999.990 -999.990 1.485 ..P WKT 2010 12 30 18 29 55 31.3200 -97.3300 251.000 30.0 152.056 5.720 -999.990 -999.990 1.521 ..P WKT 2010 12 30 18 34 55 31.3200 -97.3300 251.000 122.0 152.895 5.320 -999.990 -999.990 1.529 ..P WKT 2010 12 30 18 39 55 31.3200 -97.3300 251.000 457.0 147.578 5.740 -999.990 -999.990 1.476 ..P WKT 2010 12 30 18 49 55 31.3200 -97.3300 251.000 30.0 151.857 5.530 -999.990 -999.990 1.519 ..P WKT 2010 12 30 18 54 55 31.3200 -97.3300 251.000 122.0 156.367 6.240 -999.990 -999.990 1.564 ..P WKT 2010 12 30 18 59 55 31.3200 -97.3300 251.000 457.0 144.549 5.970 -999.990 -999.990 1.445 ..P WKT 2010 12 30 19 04 55 31.3200 -97.3300 251.000 30.0 146.650 5.540 -999.990 -999.990 1.467 ..P WKT 2010 12 30 19 09 55 31.3200 -97.3300 251.000 122.0 152.499 5.290 -999.990 -999.990 1.525 ..P WKT 2010 12 30 19 14 55 31.3200 -97.3300 251.000 457.0 145.232 5.140 -999.990 -999.990 1.452 ..P WKT 2010 12 30 19 24 55 31.3200 -97.3300 251.000 30.0 148.058 5.500 -999.990 -999.990 1.481 ..P WKT 2010 12 30 19 29 55 31.3200 -97.3300 251.000 122.0 148.782 5.150 -999.990 -999.990 1.488 ..P WKT 2010 12 30 19 34 55 31.3200 -97.3300 251.000 457.0 143.350 5.080 -999.990 -999.990 1.433 ..P WKT 2010 12 30 19 39 55 31.3200 -97.3300 251.000 30.0 148.893 4.810 -999.990 -999.990 1.489 ..P WKT 2010 12 30 19 44 55 31.3200 -97.3300 251.000 122.0 144.531 4.710 -999.990 -999.990 1.445 ..P WKT 2010 12 30 19 49 55 31.3200 -97.3300 251.000 457.0 147.799 5.120 -999.990 -999.990 1.478 ..P WKT 2010 12 30 19 59 55 31.3200 -97.3300 251.000 30.0 141.313 4.850 -999.990 -999.990 1.413 ..P WKT 2010 12 30 20 04 55 31.3200 -97.3300 251.000 122.0 140.260 6.000 -999.990 -999.990 1.403 ..P WKT 2010 12 30 20 09 55 31.3200 -97.3300 251.000 457.0 146.969 5.130 -999.990 -999.990 1.470 ..P WKT 2010 12 30 20 14 55 31.3200 -97.3300 251.000 30.0 142.971 4.190 -999.990 -999.990 1.430 ..P WKT 2010 12 30 20 19 55 31.3200 -97.3300 251.000 122.0 137.634 3.970 -999.990 -999.990 1.376 ..P WKT 2010 12 30 20 24 55 31.3200 -97.3300 251.000 457.0 138.856 4.800 -999.990 -999.990 1.389 ..P WKT 2010 12 30 20 34 55 31.3200 -97.3300 251.000 30.0 143.747 3.910 -999.990 -999.990 1.437 ..P WKT 2010 12 30 20 39 55 31.3200 -97.3300 251.000 122.0 139.653 4.300 -999.990 -999.990 1.397 ..P WKT 2010 12 30 20 44 55 31.3200 -97.3300 251.000 457.0 139.307 4.390 -999.990 -999.990 1.393 ..P WKT 2010 12 30 20 49 55 31.3200 -97.3300 251.000 30.0 141.370 4.130 -999.990 -999.990 1.414 ..P WKT 2010 12 30 20 54 55 31.3200 -97.3300 251.000 122.0 144.371 4.570 -999.990 -999.990 1.444 ..P WKT 2010 12 30 20 59 55 31.3200 -97.3300 251.000 457.0 142.820 4.190 -999.990 -999.990 1.428 ..P WKT 2010 12 30 21 09 55 31.3200 -97.3300 251.000 30.0 141.955 4.400 -999.990 -999.990 1.420 ..P WKT 2010 12 30 21 14 55 31.3200 -97.3300 251.000 122.0 140.901 4.060 -999.990 -999.990 1.409 ..P WKT 2010 12 30 21 19 55 31.3200 -97.3300 251.000 457.0 142.659 4.190 -999.990 -999.990 1.427 ..P WKT 2010 12 30 21 24 55 31.3200 -97.3300 251.000 30.0 131.297 4.430 -999.990 -999.990 1.313 ..P WKT 2010 12 30 21 29 55 31.3200 -97.3300 251.000 122.0 149.119 4.730 -999.990 -999.990 1.491 ..P WKT 2010 12 30 21 34 55 31.3200 -97.3300 251.000 457.0 140.032 5.100 -999.990 -999.990 1.400 ..P WKT 2010 12 30 21 44 55 31.3200 -97.3300 251.000 30.0 142.113 4.860 -999.990 -999.990 1.421 ..P WKT 2010 12 30 21 49 55 31.3200 -97.3300 251.000 122.0 140.696 4.080 -999.990 -999.990 1.407 ..P WKT 2010 12 30 21 54 55 31.3200 -97.3300 251.000 457.0 143.830 4.120 -999.990 -999.990 1.438 ..P WKT 2010 12 30 21 59 55 31.3200 -97.3300 251.000 30.0 135.720 4.960 -999.990 -999.990 1.357 ..P WKT 2010 12 30 22 04 55 31.3200 -97.3300 251.000 122.0 142.067 4.750 -999.990 -999.990 1.421 ..P WKT 2010 12 30 22 09 55 31.3200 -97.3300 251.000 457.0 140.650 5.100 -999.990 -999.990 1.407 ..P WKT 2010 12 30 22 19 55 31.3200 -97.3300 251.000 30.0 142.788 5.060 -999.990 -999.990 1.428 ..P WKT 2010 12 30 22 24 55 31.3200 -97.3300 251.000 122.0 144.202 4.520 -999.990 -999.990 1.442 ..P WKT 2010 12 30 22 29 55 31.3200 -97.3300 251.000 457.0 148.828 4.640 -999.990 -999.990 1.488 ..P WKT 2010 12 30 22 34 55 31.3200 -97.3300 251.000 30.0 144.618 4.260 -999.990 -999.990 1.446 ..P WKT 2010 12 30 22 39 55 31.3200 -97.3300 251.000 122.0 149.780 4.180 -999.990 -999.990 1.498 ..P WKT 2010 12 30 22 44 55 31.3200 -97.3300 251.000 457.0 143.964 4.280 -999.990 -999.990 1.440 ..P WKT 2010 12 30 22 54 55 31.3200 -97.3300 251.000 30.0 144.496 4.260 -999.990 -999.990 1.445 ..P WKT 2010 12 30 22 59 55 31.3200 -97.3300 251.000 122.0 144.150 4.170 -999.990 -999.990 1.442 ..P WKT 2010 12 30 23 04 55 31.3200 -97.3300 251.000 457.0 139.252 4.090 -999.990 -999.990 1.393 ..P WKT 2010 12 30 23 09 55 31.3200 -97.3300 251.000 30.0 137.835 4.090 -999.990 -999.990 1.378 ..P WKT 2010 12 30 23 14 55 31.3200 -97.3300 251.000 122.0 142.575 3.910 -999.990 -999.990 1.426 ..P WKT 2010 12 30 23 19 55 31.3200 -97.3300 251.000 457.0 132.858 4.950 -999.990 -999.990 1.329 ..P WKT 2010 12 30 23 29 55 31.3200 -97.3300 251.000 30.0 144.358 3.870 -999.990 -999.990 1.444 ..P WKT 2010 12 30 23 34 55 31.3200 -97.3300 251.000 122.0 140.139 4.480 -999.990 -999.990 1.401 ..P WKT 2010 12 30 23 39 55 31.3200 -97.3300 251.000 457.0 136.455 4.000 -999.990 -999.990 1.365 ..P WKT 2010 12 30 23 44 55 31.3200 -97.3300 251.000 30.0 141.608 3.930 -999.990 -999.990 1.416 ..P WKT 2010 12 30 23 49 55 31.3200 -97.3300 251.000 122.0 150.643 4.670 -999.990 -999.990 1.506 ..P WKT 2010 12 31 00 09 55 31.3200 -97.3300 251.000 457.0 134.476 4.210 -999.990 -999.990 1.345 ..P WKT 2010 12 31 00 10 25 31.3200 -97.3300 251.000 457.0 131.489 4.120 -999.990 -999.990 1.315 ..P WKT 2010 12 31 00 10 55 31.3200 -97.3300 251.000 457.0 132.386 4.110 -999.990 -999.990 1.324 ..P WKT 2010 12 31 00 11 25 31.3200 -97.3300 251.000 457.0 131.810 4.480 -999.990 -999.990 1.318 ..P WKT 2010 12 31 00 11 55 31.3200 -97.3300 251.000 457.0 135.920 4.110 -999.990 -999.990 1.359 ..P WKT 2010 12 31 00 12 25 31.3200 -97.3300 251.000 457.0 133.470 4.260 -999.990 -999.990 1.335 ..P WKT 2010 12 31 00 12 55 31.3200 -97.3300 251.000 457.0 135.304 4.760 -999.990 -999.990 1.353 ..P WKT 2010 12 31 00 13 25 31.3200 -97.3300 251.000 457.0 125.891 5.420 -999.990 -999.990 1.259 ..P WKT 2010 12 31 00 13 55 31.3200 -97.3300 251.000 457.0 134.152 4.780 -999.990 -999.990 1.342 ..P WKT 2010 12 31 00 14 25 31.3200 -97.3300 251.000 457.0 131.166 4.340 -999.990 -999.990 1.312 ..P WKT 2010 12 31 00 14 55 31.3200 -97.3300 251.000 457.0 135.276 4.500 -999.990 -999.990 1.353 ..P WKT 2010 12 31 00 19 55 31.3200 -97.3300 251.000 30.0 168.207 5.330 -999.990 -999.990 1.682 ..P WKT 2010 12 31 00 24 55 31.3200 -97.3300 251.000 122.0 138.484 5.440 -999.990 -999.990 1.385 ..P WKT 2010 12 31 00 29 55 31.3200 -97.3300 251.000 457.0 131.519 4.520 -999.990 -999.990 1.315 ..P WKT 2010 12 31 00 34 55 31.3200 -97.3300 251.000 30.0 157.486 5.020 -999.990 -999.990 1.575 ..P WKT 2010 12 31 00 39 55 31.3200 -97.3300 251.000 122.0 139.680 4.480 -999.990 -999.990 1.397 ..P WKT 2010 12 31 00 44 55 31.3200 -97.3300 251.000 457.0 132.582 4.900 -999.990 -999.990 1.326 ..P WKT 2010 12 31 00 54 55 31.3200 -97.3300 251.000 30.0 141.798 5.200 -999.990 -999.990 1.418 ..P WKT 2010 12 31 00 59 55 31.3200 -97.3300 251.000 122.0 135.757 4.840 -999.990 -999.990 1.358 ..P WKT 2010 12 31 01 04 55 31.3200 -97.3300 251.000 457.0 127.977 4.480 -999.990 -999.990 1.280 ..P WKT 2010 12 31 01 09 55 31.3200 -97.3300 251.000 30.0 136.258 6.490 -999.990 -999.990 1.363 ..P WKT 2010 12 31 01 14 55 31.3200 -97.3300 251.000 122.0 127.274 4.870 -999.990 -999.990 1.273 ..P WKT 2010 12 31 01 19 55 31.3200 -97.3300 251.000 457.0 127.925 4.590 -999.990 -999.990 1.279 ..P WKT 2010 12 31 01 29 55 31.3200 -97.3300 251.000 30.0 143.089 4.310 -999.990 -999.990 1.431 ..P WKT 2010 12 31 01 34 55 31.3200 -97.3300 251.000 122.0 144.887 6.310 -999.990 -999.990 1.449 ..P WKT 2010 12 31 01 39 55 31.3200 -97.3300 251.000 457.0 131.296 4.440 -999.990 -999.990 1.313 ..P WKT 2010 12 31 01 44 55 31.3200 -97.3300 251.000 30.0 137.243 4.590 -999.990 -999.990 1.372 ..P WKT 2010 12 31 01 49 55 31.3200 -97.3300 251.000 122.0 138.640 4.460 -999.990 -999.990 1.386 ..P WKT 2010 12 31 01 54 55 31.3200 -97.3300 251.000 457.0 138.431 4.240 -999.990 -999.990 1.384 ..P WKT 2010 12 31 02 04 55 31.3200 -97.3300 251.000 30.0 142.983 4.360 -999.990 -999.990 1.430 ..P WKT 2010 12 31 02 09 55 31.3200 -97.3300 251.000 122.0 142.124 4.830 -999.990 -999.990 1.421 ..P WKT 2010 12 31 02 14 55 31.3200 -97.3300 251.000 457.0 137.252 4.920 -999.990 -999.990 1.373 ..P WKT 2010 12 31 02 19 55 31.3200 -97.3300 251.000 30.0 138.802 4.770 -999.990 -999.990 1.388 ..P WKT 2010 12 31 02 24 55 31.3200 -97.3300 251.000 122.0 142.491 4.350 -999.990 -999.990 1.425 ..P WKT 2010 12 31 02 29 55 31.3200 -97.3300 251.000 457.0 130.397 4.520 -999.990 -999.990 1.304 ..P WKT 2010 12 31 02 39 55 31.3200 -97.3300 251.000 30.0 135.598 4.460 -999.990 -999.990 1.356 ..P WKT 2010 12 31 02 44 55 31.3200 -97.3300 251.000 122.0 150.484 6.170 -999.990 -999.990 1.505 ..P WKT 2010 12 31 02 49 55 31.3200 -97.3300 251.000 457.0 141.562 4.430 -999.990 -999.990 1.416 ..P WKT 2010 12 31 02 54 55 31.3200 -97.3300 251.000 30.0 150.028 6.400 -999.990 -999.990 1.500 ..P WKT 2010 12 31 02 59 55 31.3200 -97.3300 251.000 122.0 149.131 4.860 -999.990 -999.990 1.491 ..P WKT 2010 12 31 03 04 55 31.3200 -97.3300 251.000 457.0 143.955 4.490 -999.990 -999.990 1.440 ..P WKT 2010 12 31 03 14 55 31.3200 -97.3300 251.000 30.0 150.128 4.650 -999.990 -999.990 1.501 ..P WKT 2010 12 31 03 19 55 31.3200 -97.3300 251.000 122.0 153.186 4.820 -999.990 -999.990 1.532 ..P WKT 2010 12 31 03 24 55 31.3200 -97.3300 251.000 457.0 143.406 4.630 -999.990 -999.990 1.434 ..P WKT 2010 12 31 03 29 55 31.3200 -97.3300 251.000 30.0 150.475 4.580 -999.990 -999.990 1.505 ..P WKT 2010 12 31 03 34 55 31.3200 -97.3300 251.000 122.0 155.940 4.620 -999.990 -999.990 1.559 ..P WKT 2010 12 31 03 39 55 31.3200 -97.3300 251.000 457.0 138.806 4.820 -999.990 -999.990 1.388 ..P WKT 2010 12 31 03 49 55 31.3200 -97.3300 251.000 30.0 154.414 4.700 -999.990 -999.990 1.544 ..P WKT 2010 12 31 03 54 55 31.3200 -97.3300 251.000 122.0 168.033 4.850 -999.990 -999.990 1.680 ..P WKT 2010 12 31 03 59 55 31.3200 -97.3300 251.000 457.0 142.212 6.030 -999.990 -999.990 1.422 ..P WKT 2010 12 31 04 04 55 31.3200 -97.3300 251.000 30.0 154.761 4.960 -999.990 -999.990 1.548 ..P WKT 2010 12 31 04 09 55 31.3200 -97.3300 251.000 122.0 154.208 5.000 -999.990 -999.990 1.542 ..P WKT 2010 12 31 04 14 55 31.3200 -97.3300 251.000 457.0 140.822 4.830 -999.990 -999.990 1.408 ..P WKT 2010 12 31 04 24 55 31.3200 -97.3300 251.000 30.0 159.997 5.890 -999.990 -999.990 1.600 ..P WKT 2010 12 31 04 29 55 31.3200 -97.3300 251.000 122.0 158.871 5.580 -999.990 -999.990 1.589 ..P WKT 2010 12 31 04 34 55 31.3200 -97.3300 251.000 457.0 144.513 5.200 -999.990 -999.990 1.445 ..P WKT 2010 12 31 04 39 55 31.3200 -97.3300 251.000 30.0 161.699 5.930 -999.990 -999.990 1.617 ..P WKT 2010 12 31 04 44 55 31.3200 -97.3300 251.000 122.0 165.519 5.280 -999.990 -999.990 1.655 ..P WKT 2010 12 31 04 49 55 31.3200 -97.3300 251.000 457.0 147.151 5.620 -999.990 -999.990 1.472 ..P WKT 2010 12 31 05 04 55 31.3200 -97.3300 251.000 30.0 160.290 5.460 -999.990 -999.990 1.603 ..P WKT 2010 12 31 05 09 55 31.3200 -97.3300 251.000 122.0 164.281 5.260 -999.990 -999.990 1.643 ..P WKT 2010 12 31 05 14 55 31.3200 -97.3300 251.000 457.0 158.650 5.250 -999.990 -999.990 1.587 ..P WKT 2010 12 31 05 19 55 31.3200 -97.3300 251.000 30.0 162.507 5.460 -999.990 -999.990 1.625 ..P WKT 2010 12 31 05 24 55 31.3200 -97.3300 251.000 122.0 169.036 5.930 -999.990 -999.990 1.690 ..P WKT 2010 12 31 05 29 55 31.3200 -97.3300 251.000 457.0 158.996 5.670 -999.990 -999.990 1.590 ..P WKT 2010 12 31 05 39 55 31.3200 -97.3300 251.000 30.0 164.533 4.960 -999.990 -999.990 1.645 ..P WKT 2010 12 31 05 44 55 31.3200 -97.3300 251.000 122.0 169.287 5.740 -999.990 -999.990 1.693 ..P WKT 2010 12 31 05 49 55 31.3200 -97.3300 251.000 457.0 161.614 5.230 -999.990 -999.990 1.616 ..P WKT 2010 12 31 05 54 55 31.3200 -97.3300 251.000 30.0 165.967 6.570 -999.990 -999.990 1.660 ..P WKT 2010 12 31 05 59 55 31.3200 -97.3300 251.000 122.0 170.051 5.910 -999.990 -999.990 1.701 ..P WKT 2010 12 31 06 04 55 31.3200 -97.3300 251.000 457.0 156.235 5.840 -999.990 -999.990 1.562 ..P WKT 2010 12 31 06 14 55 31.3200 -97.3300 251.000 30.0 158.317 5.640 -999.990 -999.990 1.583 ..P WKT 2010 12 31 06 19 55 31.3200 -97.3300 251.000 122.0 154.176 5.690 -999.990 -999.990 1.542 ..P WKT 2010 12 31 06 24 55 31.3200 -97.3300 251.000 457.0 147.098 5.430 -999.990 -999.990 1.471 ..P WKT 2010 12 31 06 29 55 31.3200 -97.3300 251.000 30.0 154.179 5.310 -999.990 -999.990 1.542 ..P WKT 2010 12 31 06 34 55 31.3200 -97.3300 251.000 122.0 154.046 5.250 -999.990 -999.990 1.540 ..P WKT 2010 12 31 06 39 55 31.3200 -97.3300 251.000 457.0 141.092 4.790 -999.990 -999.990 1.411 ..P WKT 2010 12 31 06 49 55 31.3200 -97.3300 251.000 30.0 151.664 4.920 -999.990 -999.990 1.517 ..P WKT 2010 12 31 06 54 55 31.3200 -97.3300 251.000 122.0 156.492 6.000 -999.990 -999.990 1.565 ..P WKT 2010 12 31 06 59 55 31.3200 -97.3300 251.000 457.0 146.363 5.710 -999.990 -999.990 1.464 ..P WKT 2010 12 31 07 04 55 31.3200 -97.3300 251.000 30.0 146.650 5.330 -999.990 -999.990 1.467 ..P WKT 2010 12 31 07 09 55 31.3200 -97.3300 251.000 122.0 149.341 5.200 -999.990 -999.990 1.493 ..P WKT 2010 12 31 07 14 55 31.3200 -97.3300 251.000 457.0 140.815 5.300 -999.990 -999.990 1.408 ..P WKT 2010 12 31 07 24 55 31.3200 -97.3300 251.000 30.0 146.063 5.930 -999.990 -999.990 1.461 ..P WKT 2010 12 31 07 29 55 31.3200 -97.3300 251.000 122.0 149.956 6.390 -999.990 -999.990 1.500 ..P WKT 2010 12 31 07 34 55 31.3200 -97.3300 251.000 457.0 150.777 6.580 -999.990 -999.990 1.508 ..P WKT 2010 12 31 07 39 55 31.3200 -97.3300 251.000 30.0 148.127 5.790 -999.990 -999.990 1.481 ..P WKT 2010 12 31 07 44 55 31.3200 -97.3300 251.000 122.0 153.488 5.760 -999.990 -999.990 1.535 ..P WKT 2010 12 31 07 49 55 31.3200 -97.3300 251.000 457.0 144.430 5.610 -999.990 -999.990 1.444 ..P WKT 2010 12 31 07 59 55 31.3200 -97.3300 251.000 30.0 150.249 5.500 -999.990 -999.990 1.502 ..P WKT 2010 12 31 08 04 55 31.3200 -97.3300 251.000 122.0 151.642 5.550 -999.990 -999.990 1.516 ..P WKT 2010 12 31 08 09 55 31.3200 -97.3300 251.000 457.0 139.020 5.380 -999.990 -999.990 1.390 ..P WKT 2010 12 31 08 14 55 31.3200 -97.3300 251.000 30.0 143.750 6.410 -999.990 -999.990 1.438 ..P WKT 2010 12 31 08 19 55 31.3200 -97.3300 251.000 122.0 151.016 5.690 -999.990 -999.990 1.510 ..P WKT 2010 12 31 08 24 55 31.3200 -97.3300 251.000 457.0 139.863 5.290 -999.990 -999.990 1.399 ..P WKT 2010 12 31 08 34 55 31.3200 -97.3300 251.000 30.0 150.409 5.400 -999.990 -999.990 1.504 ..P WKT 2010 12 31 08 39 55 31.3200 -97.3300 251.000 122.0 142.613 6.110 -999.990 -999.990 1.426 ..P WKT 2010 12 31 08 44 55 31.3200 -97.3300 251.000 457.0 134.683 5.900 -999.990 -999.990 1.347 ..P WKT 2010 12 31 08 49 55 31.3200 -97.3300 251.000 30.0 139.699 5.680 -999.990 -999.990 1.397 ..P WKT 2010 12 31 08 54 55 31.3200 -97.3300 251.000 122.0 142.978 5.750 -999.990 -999.990 1.430 ..P WKT 2010 12 31 08 59 55 31.3200 -97.3300 251.000 457.0 131.981 6.720 -999.990 -999.990 1.320 ..P WKT 2010 12 31 09 09 55 31.3200 -97.3300 251.000 30.0 123.654 5.920 -999.990 -999.990 1.237 ..P WKT 2010 12 31 09 14 55 31.3200 -97.3300 251.000 122.0 129.793 5.800 -999.990 -999.990 1.298 ..P WKT 2010 12 31 09 19 55 31.3200 -97.3300 251.000 457.0 128.461 5.590 -999.990 -999.990 1.285 ..P WKT 2010 12 31 09 24 55 31.3200 -97.3300 251.000 30.0 124.594 5.510 -999.990 -999.990 1.246 ..P WKT 2010 12 31 09 29 55 31.3200 -97.3300 251.000 122.0 128.598 6.440 -999.990 -999.990 1.286 ..P WKT 2010 12 31 09 34 55 31.3200 -97.3300 251.000 457.0 127.133 5.580 -999.990 -999.990 1.271 ..P WKT 2010 12 31 09 44 55 31.3200 -97.3300 251.000 30.0 131.672 5.350 -999.990 -999.990 1.317 ..P WKT 2010 12 31 09 49 55 31.3200 -97.3300 251.000 122.0 129.139 5.620 -999.990 -999.990 1.291 ..P WKT 2010 12 31 09 54 55 31.3200 -97.3300 251.000 457.0 128.474 5.390 -999.990 -999.990 1.285 ..P WKT 2010 12 31 09 59 55 31.3200 -97.3300 251.000 30.0 123.807 5.420 -999.990 -999.990 1.238 ..P WKT 2010 12 31 10 04 55 31.3200 -97.3300 251.000 122.0 131.412 5.550 -999.990 -999.990 1.314 ..P WKT 2010 12 31 10 09 55 31.3200 -97.3300 251.000 457.0 119.810 5.620 -999.990 -999.990 1.198 ..P WKT 2010 12 31 10 19 55 31.3200 -97.3300 251.000 30.0 122.862 5.830 -999.990 -999.990 1.229 ..P WKT 2010 12 31 10 24 55 31.3200 -97.3300 251.000 122.0 124.446 7.630 -999.990 -999.990 1.244 ..P WKT 2010 12 31 10 29 55 31.3200 -97.3300 251.000 457.0 129.230 5.780 -999.990 -999.990 1.292 ..P WKT 2010 12 31 10 34 55 31.3200 -97.3300 251.000 30.0 130.546 5.610 -999.990 -999.990 1.305 ..P WKT 2010 12 31 10 39 55 31.3200 -97.3300 251.000 122.0 132.396 5.570 -999.990 -999.990 1.324 ..P WKT 2010 12 31 10 44 55 31.3200 -97.3300 251.000 457.0 131.045 5.600 -999.990 -999.990 1.310 ..P WKT 2010 12 31 10 54 55 31.3200 -97.3300 251.000 30.0 134.973 5.680 -999.990 -999.990 1.350 ..P WKT 2010 12 31 10 59 55 31.3200 -97.3300 251.000 122.0 134.117 6.130 -999.990 -999.990 1.341 ..P WKT 2010 12 31 11 04 55 31.3200 -97.3300 251.000 457.0 128.995 6.120 -999.990 -999.990 1.290 ..P WKT 2010 12 31 11 09 55 31.3200 -97.3300 251.000 30.0 127.340 6.140 -999.990 -999.990 1.273 ..P WKT 2010 12 31 11 14 55 31.3200 -97.3300 251.000 122.0 124.085 6.370 -999.990 -999.990 1.241 ..P WKT 2010 12 31 11 19 55 31.3200 -97.3300 251.000 457.0 127.496 6.470 -999.990 -999.990 1.275 ..P WKT 2010 12 31 11 29 55 31.3200 -97.3300 251.000 30.0 122.724 6.640 -999.990 -999.990 1.227 ..P WKT 2010 12 31 11 34 55 31.3200 -97.3300 251.000 122.0 134.405 6.430 -999.990 -999.990 1.344 ..P WKT 2010 12 31 11 39 55 31.3200 -97.3300 251.000 457.0 131.421 6.280 -999.990 -999.990 1.314 ..P WKT 2010 12 31 11 44 55 31.3200 -97.3300 251.000 30.0 132.837 6.160 -999.990 -999.990 1.328 ..P WKT 2010 12 31 11 49 55 31.3200 -97.3300 251.000 122.0 130.520 6.040 -999.990 -999.990 1.305 ..P WKT 2010 12 31 12 09 55 31.3200 -97.3300 251.000 457.0 146.827 5.730 -999.990 -999.990 1.468 ..P WKT 2010 12 31 12 10 25 31.3200 -97.3300 251.000 457.0 144.389 6.120 -999.990 -999.990 1.444 ..P WKT 2010 12 31 12 10 55 31.3200 -97.3300 251.000 457.0 141.416 5.810 -999.990 -999.990 1.414 ..P WKT 2010 12 31 12 11 25 31.3200 -97.3300 251.000 457.0 146.709 6.040 -999.990 -999.990 1.467 ..P WKT 2010 12 31 12 11 55 31.3200 -97.3300 251.000 457.0 145.736 5.840 -999.990 -999.990 1.457 ..P WKT 2010 12 31 12 12 25 31.3200 -97.3300 251.000 457.0 140.498 6.740 -999.990 -999.990 1.405 ..P WKT 2010 12 31 12 12 55 31.3200 -97.3300 251.000 457.0 141.791 6.930 -999.990 -999.990 1.418 ..P WKT 2010 12 31 12 13 25 31.3200 -97.3300 251.000 457.0 146.550 6.000 -999.990 -999.990 1.466 ..P WKT 2010 12 31 12 13 55 31.3200 -97.3300 251.000 457.0 143.978 5.780 -999.990 -999.990 1.440 ..P WKT 2010 12 31 12 14 25 31.3200 -97.3300 251.000 457.0 146.338 5.710 -999.990 -999.990 1.463 ..P WKT 2010 12 31 12 14 55 31.3200 -97.3300 251.000 457.0 147.098 5.700 -999.990 -999.990 1.471 ..P WKT 2010 12 31 12 19 55 31.3200 -97.3300 251.000 30.0 132.705 5.900 -999.990 -999.990 1.327 ..P WKT 2010 12 31 12 24 55 31.3200 -97.3300 251.000 122.0 134.042 5.800 -999.990 -999.990 1.340 ..P WKT 2010 12 31 12 29 55 31.3200 -97.3300 251.000 457.0 150.577 6.450 -999.990 -999.990 1.506 ..P WKT 2010 12 31 12 34 55 31.3200 -97.3300 251.000 30.0 138.715 5.970 -999.990 -999.990 1.387 ..P WKT 2010 12 31 12 39 55 31.3200 -97.3300 251.000 122.0 140.586 6.400 -999.990 -999.990 1.406 ..P WKT 2010 12 31 12 44 55 31.3200 -97.3300 251.000 457.0 155.122 6.480 -999.990 -999.990 1.551 ..P WKT 2010 12 31 12 54 55 31.3200 -97.3300 251.000 30.0 131.984 5.640 -999.990 -999.990 1.320 ..P WKT 2010 12 31 12 59 55 31.3200 -97.3300 251.000 122.0 140.574 5.890 -999.990 -999.990 1.406 ..P WKT 2010 12 31 13 04 55 31.3200 -97.3300 251.000 457.0 148.765 5.980 -999.990 -999.990 1.488 ..P WKT 2010 12 31 13 09 55 31.3200 -97.3300 251.000 30.0 138.020 5.680 -999.990 -999.990 1.380 ..P WKT 2010 12 31 13 14 55 31.3200 -97.3300 251.000 122.0 145.145 5.750 -999.990 -999.990 1.451 ..P WKT 2010 12 31 13 19 55 31.3200 -97.3300 251.000 457.0 140.000 5.770 -999.990 -999.990 1.400 ..P WKT 2010 12 31 13 29 55 31.3200 -97.3300 251.000 30.0 144.134 5.530 -999.990 -999.990 1.441 ..P WKT 2010 12 31 13 34 55 31.3200 -97.3300 251.000 122.0 139.942 5.520 -999.990 -999.990 1.399 ..P WKT 2010 12 31 13 39 55 31.3200 -97.3300 251.000 457.0 141.885 5.790 -999.990 -999.990 1.419 ..P WKT 2010 12 31 13 44 55 31.3200 -97.3300 251.000 30.0 136.892 6.160 -999.990 -999.990 1.369 ..P WKT 2010 12 31 13 49 55 31.3200 -97.3300 251.000 122.0 133.766 5.770 -999.990 -999.990 1.338 ..P WKT 2010 12 31 13 54 55 31.3200 -97.3300 251.000 457.0 124.237 5.690 -999.990 -999.990 1.242 ..P WKT 2010 12 31 14 04 55 31.3200 -97.3300 251.000 30.0 124.063 6.150 -999.990 -999.990 1.241 ..P WKT 2010 12 31 14 09 55 31.3200 -97.3300 251.000 122.0 122.213 7.000 -999.990 -999.990 1.222 ..P WKT 2010 12 31 14 14 55 31.3200 -97.3300 251.000 457.0 122.498 5.690 -999.990 -999.990 1.225 ..P WKT 2010 12 31 14 19 55 31.3200 -97.3300 251.000 30.0 123.851 5.950 -999.990 -999.990 1.239 ..P WKT 2010 12 31 14 24 55 31.3200 -97.3300 251.000 122.0 122.535 5.390 -999.990 -999.990 1.225 ..P WKT 2010 12 31 14 29 55 31.3200 -97.3300 251.000 457.0 123.887 5.370 -999.990 -999.990 1.239 ..P WKT 2010 12 31 14 39 55 31.3200 -97.3300 251.000 30.0 130.252 5.460 -999.990 -999.990 1.303 ..P WKT 2010 12 31 14 44 55 31.3200 -97.3300 251.000 122.0 123.255 5.440 -999.990 -999.990 1.233 ..P WKT 2010 12 31 14 49 55 31.3200 -97.3300 251.000 457.0 126.399 5.960 -999.990 -999.990 1.264 ..P WKT 2010 12 31 14 54 55 31.3200 -97.3300 251.000 30.0 126.075 5.800 -999.990 -999.990 1.261 ..P WKT 2010 12 31 14 59 55 31.3200 -97.3300 251.000 122.0 123.347 5.290 -999.990 -999.990 1.233 ..P WKT 2010 12 31 15 04 55 31.3200 -97.3300 251.000 457.0 117.949 5.580 -999.990 -999.990 1.179 ..P WKT 2010 12 31 15 14 55 31.3200 -97.3300 251.000 30.0 113.771 5.510 -999.990 -999.990 1.138 ..P WKT 2010 12 31 15 19 55 31.3200 -97.3300 251.000 122.0 123.266 5.420 -999.990 -999.990 1.233 ..P WKT 2010 12 31 15 24 55 31.3200 -97.3300 251.000 457.0 121.015 5.880 -999.990 -999.990 1.210 ..P WKT 2010 12 31 15 29 55 31.3200 -97.3300 251.000 30.0 116.894 5.650 -999.990 -999.990 1.169 ..P WKT 2010 12 31 15 34 55 31.3200 -97.3300 251.000 122.0 125.055 5.500 -999.990 -999.990 1.251 ..P WKT 2010 12 31 15 39 55 31.3200 -97.3300 251.000 457.0 120.534 5.630 -999.990 -999.990 1.205 ..P WKT 2010 12 31 15 49 55 31.3200 -97.3300 251.000 30.0 124.633 5.490 -999.990 -999.990 1.246 ..P WKT 2010 12 31 15 54 55 31.3200 -97.3300 251.000 122.0 119.233 7.610 -999.990 -999.990 1.192 ..P WKT 2010 12 31 15 59 55 31.3200 -97.3300 251.000 457.0 117.573 6.080 -999.990 -999.990 1.176 ..P WKT 2010 12 31 16 04 55 31.3200 -97.3300 251.000 30.0 118.983 5.300 -999.990 -999.990 1.190 ..P WKT 2010 12 31 16 09 55 31.3200 -97.3300 251.000 122.0 120.260 5.770 -999.990 -999.990 1.203 ..P WKT 2010 12 31 16 14 55 31.3200 -97.3300 251.000 457.0 117.664 5.850 -999.990 -999.990 1.177 ..P WKT 2010 12 31 16 24 55 31.3200 -97.3300 251.000 30.0 125.236 5.250 -999.990 -999.990 1.252 ..P WKT 2010 12 31 16 29 55 31.3200 -97.3300 251.000 122.0 120.179 5.130 -999.990 -999.990 1.202 ..P WKT 2010 12 31 16 34 55 31.3200 -97.3300 251.000 457.0 122.734 5.400 -999.990 -999.990 1.227 ..P WKT 2010 12 31 16 39 55 31.3200 -97.3300 251.000 30.0 125.290 6.320 -999.990 -999.990 1.253 ..P WKT 2010 12 31 16 44 55 31.3200 -97.3300 251.000 122.0 126.644 5.230 -999.990 -999.990 1.266 ..P WKT 2010 12 31 16 49 55 31.3200 -97.3300 251.000 457.0 118.113 6.780 -999.990 -999.990 1.181 ..P WKT 2010 12 31 17 04 55 31.3200 -97.3300 251.000 30.0 114.893 5.240 -999.990 -999.990 1.149 ..P WKT 2010 12 31 17 09 55 31.3200 -97.3300 251.000 122.0 117.215 5.490 -999.990 -999.990 1.172 ..P WKT 2010 12 31 17 14 55 31.3200 -97.3300 251.000 457.0 117.667 5.470 -999.990 -999.990 1.177 ..P WKT 2010 12 31 17 19 55 31.3200 -97.3300 251.000 30.0 118.654 6.800 -999.990 -999.990 1.187 ..P WKT 2010 12 31 17 24 55 31.3200 -97.3300 251.000 122.0 118.305 5.800 -999.990 -999.990 1.183 ..P WKT 2010 12 31 17 29 55 31.3200 -97.3300 251.000 457.0 115.149 5.980 -999.990 -999.990 1.151 ..P WKT 2010 12 31 17 39 55 31.3200 -97.3300 251.000 30.0 112.888 6.090 -999.990 -999.990 1.129 ..P WKT 2010 12 31 17 44 55 31.3200 -97.3300 251.000 122.0 118.328 5.980 -999.990 -999.990 1.183 ..P WKT 2010 12 31 17 49 55 31.3200 -97.3300 251.000 457.0 131.520 6.660 -999.990 -999.990 1.315 ..P WKT 2010 12 31 17 54 55 31.3200 -97.3300 251.000 30.0 126.536 5.460 -999.990 -999.990 1.265 ..P WKT 2010 12 31 17 59 55 31.3200 -97.3300 251.000 122.0 120.482 5.520 -999.990 -999.990 1.205 ..P WKT 2010 12 31 18 04 55 31.3200 -97.3300 251.000 457.0 117.636 5.370 -999.990 -999.990 1.176 ..P WKT 2010 12 31 18 14 55 31.3200 -97.3300 251.000 30.0 123.630 4.960 -999.990 -999.990 1.236 ..P WKT 2010 12 31 18 19 55 31.3200 -97.3300 251.000 122.0 119.637 5.150 -999.990 -999.990 1.196 ..P WKT 2010 12 31 18 24 55 31.3200 -97.3300 251.000 457.0 118.585 5.590 -999.990 -999.990 1.186 ..P WKT 2010 12 31 18 29 55 31.3200 -97.3300 251.000 30.0 117.534 5.410 -999.990 -999.990 1.175 ..P WKT 2010 12 31 18 34 55 31.3200 -97.3300 251.000 122.0 118.621 5.100 -999.990 -999.990 1.186 ..P WKT 2010 12 31 18 39 55 31.3200 -97.3300 251.000 457.0 121.313 5.360 -999.990 -999.990 1.213 ..P WKT 2010 12 31 18 49 55 31.3200 -97.3300 251.000 30.0 120.776 5.030 -999.990 -999.990 1.208 ..P WKT 2010 12 31 18 54 55 31.3200 -97.3300 251.000 122.0 127.709 5.110 -999.990 -999.990 1.277 ..P WKT 2010 12 31 18 59 55 31.3200 -97.3300 251.000 457.0 123.410 5.440 -999.990 -999.990 1.234 ..P WKT 2010 12 31 19 04 55 31.3200 -97.3300 251.000 30.0 122.587 5.980 -999.990 -999.990 1.226 ..P WKT 2010 12 31 19 09 55 31.3200 -97.3300 251.000 122.0 124.974 5.090 -999.990 -999.990 1.250 ..P WKT 2010 12 31 19 14 55 31.3200 -97.3300 251.000 457.0 124.954 4.630 -999.990 -999.990 1.250 ..P WKT 2010 12 31 19 24 55 31.3200 -97.3300 251.000 30.0 123.424 4.910 -999.990 -999.990 1.234 ..P WKT 2010 12 31 19 29 55 31.3200 -97.3300 251.000 122.0 124.722 5.700 -999.990 -999.990 1.247 ..P WKT 2010 12 31 19 34 55 31.3200 -97.3300 251.000 457.0 128.161 5.330 -999.990 -999.990 1.282 ..P WKT 2010 12 31 19 39 55 31.3200 -97.3300 251.000 30.0 118.624 5.220 -999.990 -999.990 1.186 ..P WKT 2010 12 31 19 44 55 31.3200 -97.3300 251.000 122.0 127.012 4.700 -999.990 -999.990 1.270 ..P WKT 2010 12 31 19 49 55 31.3200 -97.3300 251.000 457.0 121.890 5.200 -999.990 -999.990 1.219 ..P WKT 2010 12 31 19 59 55 31.3200 -97.3300 251.000 30.0 118.065 4.900 -999.990 -999.990 1.181 ..P WKT 2010 12 31 20 04 55 31.3200 -97.3300 251.000 122.0 116.153 4.900 -999.990 -999.990 1.162 ..P WKT 2010 12 31 20 09 55 31.3200 -97.3300 251.000 457.0 119.458 4.740 -999.990 -999.990 1.195 ..P WKT 2010 12 31 20 14 55 31.3200 -97.3300 251.000 30.0 120.355 5.020 -999.990 -999.990 1.204 ..P WKT 2010 12 31 20 19 55 31.3200 -97.3300 251.000 122.0 123.394 5.220 -999.990 -999.990 1.234 ..P WKT 2010 12 31 20 24 55 31.3200 -97.3300 251.000 457.0 117.333 4.520 -999.990 -999.990 1.173 ..P WKT 2010 12 31 20 34 55 31.3200 -97.3300 251.000 30.0 120.236 4.900 -999.990 -999.990 1.202 ..P WKT 2010 12 31 20 39 55 31.3200 -97.3300 251.000 122.0 120.770 5.710 -999.990 -999.990 1.208 ..P WKT 2010 12 31 20 44 55 31.3200 -97.3300 251.000 457.0 119.430 5.190 -999.990 -999.990 1.194 ..P WKT 2010 12 31 20 49 55 31.3200 -97.3300 251.000 30.0 120.767 5.230 -999.990 -999.990 1.208 ..P WKT 2010 12 31 20 54 55 31.3200 -97.3300 251.000 122.0 124.915 5.180 -999.990 -999.990 1.249 ..P WKT 2010 12 31 20 59 55 31.3200 -97.3300 251.000 457.0 122.506 5.580 -999.990 -999.990 1.225 ..P WKT 2010 12 31 21 09 55 31.3200 -97.3300 251.000 30.0 126.251 5.340 -999.990 -999.990 1.263 ..P WKT 2010 12 31 21 14 55 31.3200 -97.3300 251.000 122.0 125.045 5.790 -999.990 -999.990 1.250 ..P WKT 2010 12 31 21 19 55 31.3200 -97.3300 251.000 457.0 117.949 4.980 -999.990 -999.990 1.179 ..P WKT 2010 12 31 21 24 55 31.3200 -97.3300 251.000 30.0 123.705 4.790 -999.990 -999.990 1.237 ..P WKT 2010 12 31 21 29 55 31.3200 -97.3300 251.000 122.0 120.893 4.640 -999.990 -999.990 1.209 ..P WKT 2010 12 31 21 34 55 31.3200 -97.3300 251.000 457.0 119.686 5.770 -999.990 -999.990 1.197 ..P WKT 2010 12 31 21 44 55 31.3200 -97.3300 251.000 30.0 122.744 5.100 -999.990 -999.990 1.227 ..P WKT 2010 12 31 21 49 55 31.3200 -97.3300 251.000 122.0 119.779 4.200 -999.990 -999.990 1.198 ..P WKT 2010 12 31 21 54 55 31.3200 -97.3300 251.000 457.0 122.704 4.260 -999.990 -999.990 1.227 ..P WKT 2010 12 31 21 59 55 31.3200 -97.3300 251.000 30.0 121.077 5.010 -999.990 -999.990 1.211 ..P WKT 2010 12 31 22 04 55 31.3200 -97.3300 251.000 122.0 123.199 4.180 -999.990 -999.990 1.232 ..P WKT 2010 12 31 22 09 55 31.3200 -97.3300 251.000 457.0 119.697 4.170 -999.990 -999.990 1.197 ..P WKT 2010 12 31 22 19 55 31.3200 -97.3300 251.000 30.0 126.888 4.100 -999.990 -999.990 1.269 ..P WKT 2010 12 31 22 24 55 31.3200 -97.3300 251.000 122.0 118.832 4.860 -999.990 -999.990 1.188 ..P WKT 2010 12 31 22 29 55 31.3200 -97.3300 251.000 457.0 122.562 4.220 -999.990 -999.990 1.226 ..P WKT 2010 12 31 22 34 55 31.3200 -97.3300 251.000 30.0 120.399 4.930 -999.990 -999.990 1.204 ..P WKT 2010 12 31 22 39 55 31.3200 -97.3300 251.000 122.0 123.594 4.730 -999.990 -999.990 1.236 ..P WKT 2010 12 31 22 44 55 31.3200 -97.3300 251.000 457.0 120.895 4.260 -999.990 -999.990 1.209 ..P WKT 2010 12 31 22 54 55 31.3200 -97.3300 251.000 30.0 117.198 4.960 -999.990 -999.990 1.172 ..P WKT 2010 12 31 22 59 55 31.3200 -97.3300 251.000 122.0 122.633 5.190 -999.990 -999.990 1.226 ..P WKT 2010 12 31 23 04 55 31.3200 -97.3300 251.000 457.0 117.349 5.620 -999.990 -999.990 1.173 ..P WKT 2010 12 31 23 09 55 31.3200 -97.3300 251.000 30.0 120.908 4.520 -999.990 -999.990 1.209 ..P WKT 2010 12 31 23 14 55 31.3200 -97.3300 251.000 122.0 125.003 5.000 -999.990 -999.990 1.250 ..P WKT 2010 12 31 23 19 55 31.3200 -97.3300 251.000 457.0 123.605 5.060 -999.990 -999.990 1.236 ..P WKT 2010 12 31 23 29 55 31.3200 -97.3300 251.000 30.0 119.997 5.450 -999.990 -999.990 1.200 ..P WKT 2010 12 31 23 34 55 31.3200 -97.3300 251.000 122.0 120.333 5.190 -999.990 -999.990 1.203 ..P WKT 2010 12 31 23 39 55 31.3200 -97.3300 251.000 457.0 121.071 4.400 -999.990 -999.990 1.211 ..P WKT 2010 12 31 23 44 55 31.3200 -97.3300 251.000 30.0 123.686 4.680 -999.990 -999.990 1.237 ..P WKT 2010 12 31 23 49 55 31.3200 -97.3300 251.000 122.0 125.497 4.460 -999.990 -999.990 1.255 ..P