# # ************ USE OF ESRL GMD DATA **************** # # These data are made freely available to the public and the # scientific community in the belief that their wide dissemination # will lead to greater understanding and new scientific insights. # The availability of these data does not constitute publication # of the data. NOAA relies on the ethics and integrity of the user to # assure that ESRL receives fair credit for their work. If the data # are obtained for potential use in a publication or presentation, # ESRL should be informed at the outset of the nature of this work. # If the ESRL data are essential to the work, or if an important # result or conclusion depends on the ESRL data, co-authorship # may be appropriate. This should be discussed at an early stage in # the work. Manuscripts using the ESRL data should be sent to ESRL # for review before they are submitted for publication so we can # insure that the quality and limitations of the data are accurately # represented. # # Every effort is made to produce the most accurate and precise # measurements possible. However, we reserve the right to make # corrections to the data based on recalibration of standard gases # or for other reasons deemed scientifically justified. # # We are not responsible for results and conclusions based on use # of these data without regard to this warning. # # File Creation: 2011-06-02 08:40:10 # # File Content: # # Please refer to the species-specific README file in the # appropriate directory folder at ftp://ftp.cmdl.noaa.gov/ccg. # # Contact: # # Compound: CO (In Situ) # Arlyn Andrews # tel: (303) 497-6773 # email: Arlyn.Andrews@noaa.gov # # ************ COLLABORATORS *************** # # NOAA thanks "Blackland Research and Extension Center-Texas Agricultural # Experiment Station" without whom these measurements would not # be possible. # # URL: http://www.pinnacletowers.com/ # # Sensors were installed on the KWKT-TV transmitter tower in February # 2001. In May 2006, this site became the first to use our newly # redesigned instrumentation suite. The upgrades were made in # time for the Texas Air Quality Study 2006 . We also carried # out a demonstration study during 2006 where an O3 sensor was # mounted at our highest sampling level (457 m above ground level). # The O3 data showed clear evidence of nighttime transport of # ozone in the nocturnal jet at the top of the planetary boundary # layer. This site periodically samples air that has passed over # the Dallas - Fort Worth and Houston metropolitan areas. At other # times, the site samples relatively clean air from the Gulf of # Mexico. Summertime weather patterns are dominated by a monsoonal # circulation over the Gulf. WKT thus provides a measurement of # the initial CO2 concentration for air passing over the continent # from the south. As air moves northward, the CO2 concentration # is modified by the action of sources (fossil fuel combustion, # plant respiration, biomass burning, cement production) and sinks # (photosynthesis). Partners: Blackland Research and Extension # Center-Texas Agricultural Experiment Station (Onyango Okello). # # # ************ RECIPROCITY AGREEMENT *************** # # Use of these data implies an agreement to reciprocate. # Laboratories making similar measurements agree to make their # own data available to the general public and to the scientific # community in an equally complete and easily accessible form. # Modelers are encouraged to make available to the community, # upon request, their own tools used in the interpretation # of the ESRL data, namely well documented model code, transport # fields, and additional information necessary for other # scientists to repeat the work and to run modified versions. # Model availability includes collaborative support for new # users of the models. # # ************************************************** # # code yr mo dy hr mn sc lat lon elev(masl) ht(magl) value totunc atmvar measunc scaleunc flag WKT 2011 04 01 00 09 55 31.3200 -97.3300 251.000 457.0 196.898 4.450 -999.990 -999.990 1.969 ..P WKT 2011 04 01 00 10 25 31.3200 -97.3300 251.000 457.0 197.945 4.730 -999.990 -999.990 1.979 ..P WKT 2011 04 01 00 10 55 31.3200 -97.3300 251.000 457.0 196.966 4.560 -999.990 -999.990 1.970 ..P WKT 2011 04 01 00 11 25 31.3200 -97.3300 251.000 457.0 198.351 4.240 -999.990 -999.990 1.984 ..P WKT 2011 04 01 00 11 55 31.3200 -97.3300 251.000 457.0 196.021 4.040 -999.990 -999.990 1.960 ..P WKT 2011 04 01 00 12 25 31.3200 -97.3300 251.000 457.0 194.704 4.390 -999.990 -999.990 1.947 ..P WKT 2011 04 01 00 12 55 31.3200 -97.3300 251.000 457.0 198.114 4.010 -999.990 -999.990 1.981 ..P WKT 2011 04 01 00 13 25 31.3200 -97.3300 251.000 457.0 195.109 4.060 -999.990 -999.990 1.951 ..P WKT 2011 04 01 00 13 55 31.3200 -97.3300 251.000 457.0 195.818 3.660 -999.990 -999.990 1.958 ..P WKT 2011 04 01 00 14 25 31.3200 -97.3300 251.000 457.0 200.241 3.590 -999.990 -999.990 2.002 ..P WKT 2011 04 01 00 14 55 31.3200 -97.3300 251.000 457.0 191.159 3.620 -999.990 -999.990 1.912 ..P WKT 2011 04 01 00 19 55 31.3200 -97.3300 251.000 30.0 202.637 3.560 -999.990 -999.990 2.026 ..P WKT 2011 04 01 00 24 55 31.3200 -97.3300 251.000 122.0 209.724 4.270 -999.990 -999.990 2.097 ..P WKT 2011 04 01 00 29 55 31.3200 -97.3300 251.000 457.0 199.936 4.160 -999.990 -999.990 1.999 ..P WKT 2011 04 01 00 34 55 31.3200 -97.3300 251.000 30.0 204.322 3.200 -999.990 -999.990 2.043 ..P WKT 2011 04 01 00 39 55 31.3200 -97.3300 251.000 122.0 203.309 2.850 -999.990 -999.990 2.033 ..P WKT 2011 04 01 00 44 55 31.3200 -97.3300 251.000 457.0 197.910 2.500 -999.990 -999.990 1.979 ..P WKT 2011 04 01 00 54 55 31.3200 -97.3300 251.000 30.0 222.249 3.630 -999.990 -999.990 2.222 ..P WKT 2011 04 01 00 59 55 31.3200 -97.3300 251.000 122.0 220.282 4.330 -999.990 -999.990 2.203 ..P WKT 2011 04 01 01 04 55 31.3200 -97.3300 251.000 457.0 206.515 2.930 -999.990 -999.990 2.065 ..P WKT 2011 04 01 01 09 55 31.3200 -97.3300 251.000 30.0 215.336 3.480 -999.990 -999.990 2.153 ..P WKT 2011 04 01 01 14 55 31.3200 -97.3300 251.000 122.0 215.730 4.410 -999.990 -999.990 2.157 ..P WKT 2011 04 01 01 19 55 31.3200 -97.3300 251.000 457.0 199.946 4.720 -999.990 -999.990 1.999 ..P WKT 2011 04 01 01 29 55 31.3200 -97.3300 251.000 30.0 211.374 3.910 -999.990 -999.990 2.114 ..P WKT 2011 04 01 01 34 55 31.3200 -97.3300 251.000 122.0 209.433 3.820 -999.990 -999.990 2.094 ..P WKT 2011 04 01 01 39 55 31.3200 -97.3300 251.000 457.0 199.410 3.970 -999.990 -999.990 1.994 ..P WKT 2011 04 01 01 44 55 31.3200 -97.3300 251.000 30.0 213.637 3.620 -999.990 -999.990 2.136 ..P WKT 2011 04 01 01 49 55 31.3200 -97.3300 251.000 122.0 209.340 3.280 -999.990 -999.990 2.093 ..P WKT 2011 04 01 01 54 55 31.3200 -97.3300 251.000 457.0 194.775 2.950 -999.990 -999.990 1.948 ..P WKT 2011 04 01 02 04 55 31.3200 -97.3300 251.000 30.0 223.624 3.390 -999.990 -999.990 2.236 ..P WKT 2011 04 01 02 09 55 31.3200 -97.3300 251.000 122.0 214.688 3.440 -999.990 -999.990 2.147 ..P WKT 2011 04 01 02 14 55 31.3200 -97.3300 251.000 457.0 200.371 4.890 -999.990 -999.990 2.004 ..P WKT 2011 04 01 02 19 55 31.3200 -97.3300 251.000 30.0 230.806 3.430 -999.990 -999.990 2.308 ..P WKT 2011 04 01 02 24 55 31.3200 -97.3300 251.000 122.0 214.977 4.140 -999.990 -999.990 2.150 ..P WKT 2011 04 01 02 29 55 31.3200 -97.3300 251.000 457.0 182.332 3.970 -999.990 -999.990 1.823 ..P WKT 2011 04 01 02 39 55 31.3200 -97.3300 251.000 30.0 238.492 4.190 -999.990 -999.990 2.385 ..P WKT 2011 04 01 02 44 55 31.3200 -97.3300 251.000 122.0 212.943 3.520 -999.990 -999.990 2.129 ..P WKT 2011 04 01 02 49 55 31.3200 -97.3300 251.000 457.0 196.815 3.490 -999.990 -999.990 1.968 ..P WKT 2011 04 01 02 54 55 31.3200 -97.3300 251.000 30.0 228.760 4.760 -999.990 -999.990 2.288 ..P WKT 2011 04 01 02 59 55 31.3200 -97.3300 251.000 122.0 217.506 5.110 -999.990 -999.990 2.175 ..P WKT 2011 04 01 03 04 55 31.3200 -97.3300 251.000 457.0 185.252 4.320 -999.990 -999.990 1.853 ..P WKT 2011 04 01 03 14 55 31.3200 -97.3300 251.000 30.0 231.112 4.490 -999.990 -999.990 2.311 ..P WKT 2011 04 01 03 19 55 31.3200 -97.3300 251.000 122.0 224.543 5.130 -999.990 -999.990 2.245 ..P WKT 2011 04 01 03 24 55 31.3200 -97.3300 251.000 457.0 180.862 3.850 -999.990 -999.990 1.809 ..P WKT 2011 04 01 03 29 55 31.3200 -97.3300 251.000 30.0 231.897 5.870 -999.990 -999.990 2.319 ..P WKT 2011 04 01 03 34 55 31.3200 -97.3300 251.000 122.0 215.762 3.890 -999.990 -999.990 2.158 ..P WKT 2011 04 01 03 39 55 31.3200 -97.3300 251.000 457.0 176.799 4.690 -999.990 -999.990 1.768 ..P WKT 2011 04 01 03 49 55 31.3200 -97.3300 251.000 30.0 224.704 3.510 -999.990 -999.990 2.247 ..P WKT 2011 04 01 03 54 55 31.3200 -97.3300 251.000 122.0 202.800 3.650 -999.990 -999.990 2.028 ..P WKT 2011 04 01 03 59 55 31.3200 -97.3300 251.000 457.0 177.211 3.770 -999.990 -999.990 1.772 ..P WKT 2011 04 01 04 04 55 31.3200 -97.3300 251.000 30.0 224.772 4.770 -999.990 -999.990 2.248 ..P WKT 2011 04 01 04 09 55 31.3200 -97.3300 251.000 122.0 213.613 4.400 -999.990 -999.990 2.136 ..P WKT 2011 04 01 04 14 55 31.3200 -97.3300 251.000 457.0 173.273 2.930 -999.990 -999.990 1.733 ..P WKT 2011 04 01 04 24 55 31.3200 -97.3300 251.000 30.0 220.968 3.640 -999.990 -999.990 2.210 ..P WKT 2011 04 01 04 29 55 31.3200 -97.3300 251.000 122.0 217.430 5.490 -999.990 -999.990 2.174 ..P WKT 2011 04 01 04 34 55 31.3200 -97.3300 251.000 457.0 169.305 4.440 -999.990 -999.990 1.693 ..P WKT 2011 04 01 04 39 55 31.3200 -97.3300 251.000 30.0 221.755 3.980 -999.990 -999.990 2.218 ..P WKT 2011 04 01 04 44 55 31.3200 -97.3300 251.000 122.0 216.208 5.440 -999.990 -999.990 2.162 ..P WKT 2011 04 01 04 49 55 31.3200 -97.3300 251.000 457.0 189.551 3.420 -999.990 -999.990 1.896 ..P WKT 2011 04 01 05 04 55 31.3200 -97.3300 251.000 30.0 223.843 3.920 -999.990 -999.990 2.238 ..P WKT 2011 04 01 05 09 55 31.3200 -97.3300 251.000 122.0 215.617 4.490 -999.990 -999.990 2.156 ..P WKT 2011 04 01 05 14 55 31.3200 -97.3300 251.000 457.0 188.639 3.810 -999.990 -999.990 1.886 ..P WKT 2011 04 01 05 19 55 31.3200 -97.3300 251.000 30.0 226.963 3.090 -999.990 -999.990 2.270 ..P WKT 2011 04 01 05 24 55 31.3200 -97.3300 251.000 122.0 209.031 3.100 -999.990 -999.990 2.090 ..P WKT 2011 04 01 05 29 55 31.3200 -97.3300 251.000 457.0 172.357 3.570 -999.990 -999.990 1.724 ..P WKT 2011 04 01 05 39 55 31.3200 -97.3300 251.000 30.0 222.534 3.010 -999.990 -999.990 2.225 ..P WKT 2011 04 01 05 44 55 31.3200 -97.3300 251.000 122.0 206.288 4.140 -999.990 -999.990 2.063 ..P WKT 2011 04 01 05 49 55 31.3200 -97.3300 251.000 457.0 192.890 3.680 -999.990 -999.990 1.929 ..P WKT 2011 04 01 05 54 55 31.3200 -97.3300 251.000 30.0 215.960 4.130 -999.990 -999.990 2.160 ..P WKT 2011 04 01 05 59 55 31.3200 -97.3300 251.000 122.0 204.070 3.610 -999.990 -999.990 2.041 ..P WKT 2011 04 01 06 04 55 31.3200 -97.3300 251.000 457.0 175.963 4.710 -999.990 -999.990 1.760 ..P WKT 2011 04 01 06 14 55 31.3200 -97.3300 251.000 30.0 219.837 3.860 -999.990 -999.990 2.198 ..P WKT 2011 04 01 06 19 55 31.3200 -97.3300 251.000 122.0 209.219 4.020 -999.990 -999.990 2.092 ..P WKT 2011 04 01 06 24 55 31.3200 -97.3300 251.000 457.0 176.373 3.310 -999.990 -999.990 1.764 ..P WKT 2011 04 01 06 29 55 31.3200 -97.3300 251.000 30.0 209.881 4.880 -999.990 -999.990 2.099 ..P WKT 2011 04 01 06 34 55 31.3200 -97.3300 251.000 122.0 200.938 3.970 -999.990 -999.990 2.009 ..P WKT 2011 04 01 06 39 55 31.3200 -97.3300 251.000 457.0 166.938 3.750 -999.990 -999.990 1.669 ..P WKT 2011 04 01 06 49 55 31.3200 -97.3300 251.000 30.0 220.318 5.810 -999.990 -999.990 2.203 ..P WKT 2011 04 01 06 54 55 31.3200 -97.3300 251.000 122.0 206.631 3.220 -999.990 -999.990 2.066 ..P WKT 2011 04 01 06 59 55 31.3200 -97.3300 251.000 457.0 168.070 3.570 -999.990 -999.990 1.681 ..P WKT 2011 04 01 07 04 55 31.3200 -97.3300 251.000 30.0 227.018 3.210 -999.990 -999.990 2.270 ..P WKT 2011 04 01 07 09 55 31.3200 -97.3300 251.000 122.0 214.004 3.870 -999.990 -999.990 2.140 ..P WKT 2011 04 01 07 14 55 31.3200 -97.3300 251.000 457.0 164.440 2.270 -999.990 -999.990 1.644 ..P WKT 2011 04 01 07 24 55 31.3200 -97.3300 251.000 30.0 223.135 3.190 -999.990 -999.990 2.231 ..P WKT 2011 04 01 07 29 55 31.3200 -97.3300 251.000 122.0 204.550 2.810 -999.990 -999.990 2.046 ..P WKT 2011 04 01 07 34 55 31.3200 -97.3300 251.000 457.0 164.952 3.790 -999.990 -999.990 1.650 ..P WKT 2011 04 01 07 39 55 31.3200 -97.3300 251.000 30.0 223.441 2.900 -999.990 -999.990 2.234 ..P WKT 2011 04 01 07 44 55 31.3200 -97.3300 251.000 122.0 208.867 4.060 -999.990 -999.990 2.089 ..P WKT 2011 04 01 07 49 55 31.3200 -97.3300 251.000 457.0 159.946 2.190 -999.990 -999.990 1.599 ..P WKT 2011 04 01 07 59 55 31.3200 -97.3300 251.000 30.0 216.467 3.750 -999.990 -999.990 2.165 ..P WKT 2011 04 01 08 04 55 31.3200 -97.3300 251.000 122.0 204.521 4.140 -999.990 -999.990 2.045 ..P WKT 2011 04 01 08 09 55 31.3200 -97.3300 251.000 457.0 164.913 2.850 -999.990 -999.990 1.649 ..P WKT 2011 04 01 08 14 55 31.3200 -97.3300 251.000 30.0 217.966 3.900 -999.990 -999.990 2.180 ..P WKT 2011 04 01 08 19 55 31.3200 -97.3300 251.000 122.0 213.356 3.520 -999.990 -999.990 2.134 ..P WKT 2011 04 01 08 24 55 31.3200 -97.3300 251.000 457.0 157.768 2.580 -999.990 -999.990 1.578 ..P WKT 2011 04 01 08 34 55 31.3200 -97.3300 251.000 30.0 231.558 3.560 -999.990 -999.990 2.316 ..P WKT 2011 04 01 08 39 55 31.3200 -97.3300 251.000 122.0 234.990 3.670 -999.990 -999.990 2.350 ..P WKT 2011 04 01 08 44 55 31.3200 -97.3300 251.000 457.0 154.834 3.920 -999.990 -999.990 1.548 ..P WKT 2011 04 01 08 49 55 31.3200 -97.3300 251.000 30.0 227.865 5.370 -999.990 -999.990 2.279 ..P WKT 2011 04 01 08 54 55 31.3200 -97.3300 251.000 122.0 225.636 4.950 -999.990 -999.990 2.256 ..P WKT 2011 04 01 08 59 55 31.3200 -97.3300 251.000 457.0 163.822 3.150 -999.990 -999.990 1.638 ..P WKT 2011 04 01 09 09 55 31.3200 -97.3300 251.000 30.0 236.448 3.460 -999.990 -999.990 2.364 ..P WKT 2011 04 01 09 14 55 31.3200 -97.3300 251.000 122.0 220.434 4.540 -999.990 -999.990 2.204 ..P WKT 2011 04 01 09 19 55 31.3200 -97.3300 251.000 457.0 153.354 5.310 -999.990 -999.990 1.534 ..P WKT 2011 04 01 09 24 55 31.3200 -97.3300 251.000 30.0 235.822 5.130 -999.990 -999.990 2.358 ..P WKT 2011 04 01 09 29 55 31.3200 -97.3300 251.000 122.0 229.294 4.590 -999.990 -999.990 2.293 ..P WKT 2011 04 01 09 34 55 31.3200 -97.3300 251.000 457.0 156.586 3.300 -999.990 -999.990 1.566 ..P WKT 2011 04 01 09 44 55 31.3200 -97.3300 251.000 30.0 243.537 3.210 -999.990 -999.990 2.435 ..P WKT 2011 04 01 09 49 55 31.3200 -97.3300 251.000 122.0 235.087 4.510 -999.990 -999.990 2.351 ..P WKT 2011 04 01 09 54 55 31.3200 -97.3300 251.000 457.0 154.512 4.090 -999.990 -999.990 1.545 ..P WKT 2011 04 01 09 59 55 31.3200 -97.3300 251.000 30.0 237.805 5.020 -999.990 -999.990 2.378 ..P WKT 2011 04 01 10 04 55 31.3200 -97.3300 251.000 122.0 236.338 3.710 -999.990 -999.990 2.363 ..P WKT 2011 04 01 10 09 55 31.3200 -97.3300 251.000 457.0 175.730 2.540 -999.990 -999.990 1.757 ..P WKT 2011 04 01 10 19 55 31.3200 -97.3300 251.000 30.0 234.621 3.510 -999.990 -999.990 2.346 ..P WKT 2011 04 01 10 24 55 31.3200 -97.3300 251.000 122.0 217.736 2.840 -999.990 -999.990 2.177 ..P WKT 2011 04 01 10 29 55 31.3200 -97.3300 251.000 457.0 175.118 4.100 -999.990 -999.990 1.751 ..P WKT 2011 04 01 10 34 55 31.3200 -97.3300 251.000 30.0 230.463 2.990 -999.990 -999.990 2.305 ..P WKT 2011 04 01 10 39 55 31.3200 -97.3300 251.000 122.0 214.746 5.160 -999.990 -999.990 2.147 ..P WKT 2011 04 01 10 44 55 31.3200 -97.3300 251.000 457.0 173.143 2.680 -999.990 -999.990 1.731 ..P WKT 2011 04 01 10 54 55 31.3200 -97.3300 251.000 30.0 219.061 3.320 -999.990 -999.990 2.191 ..P WKT 2011 04 01 10 59 55 31.3200 -97.3300 251.000 122.0 201.198 3.210 -999.990 -999.990 2.012 ..P WKT 2011 04 01 11 04 55 31.3200 -97.3300 251.000 457.0 175.543 3.910 -999.990 -999.990 1.755 ..P WKT 2011 04 01 11 09 55 31.3200 -97.3300 251.000 30.0 225.528 5.410 -999.990 -999.990 2.255 ..P WKT 2011 04 01 11 14 55 31.3200 -97.3300 251.000 122.0 205.847 3.630 -999.990 -999.990 2.058 ..P WKT 2011 04 01 11 19 55 31.3200 -97.3300 251.000 457.0 167.765 2.970 -999.990 -999.990 1.678 ..P WKT 2011 04 01 11 29 55 31.3200 -97.3300 251.000 30.0 212.635 3.320 -999.990 -999.990 2.126 ..P WKT 2011 04 01 11 34 55 31.3200 -97.3300 251.000 122.0 203.894 3.920 -999.990 -999.990 2.039 ..P WKT 2011 04 01 11 39 55 31.3200 -97.3300 251.000 457.0 138.476 3.970 -999.990 -999.990 1.385 ..P WKT 2011 04 01 11 44 55 31.3200 -97.3300 251.000 30.0 210.944 4.430 -999.990 -999.990 2.109 ..P WKT 2011 04 01 11 49 55 31.3200 -97.3300 251.000 122.0 196.572 4.000 -999.990 -999.990 1.966 ..P WKT 2011 04 01 12 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 10 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 10 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 11 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 11 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 12 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 12 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 13 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 13 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 14 25 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 12 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 13 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 13 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 13 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 13 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 13 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 13 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 13 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 13 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 13 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 13 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 14 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 14 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 14 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 14 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 14 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 14 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 14 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 14 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 14 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 14 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 14 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 15 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 15 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 15 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 15 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 15 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 15 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 15 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 15 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 15 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 15 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 16 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 16 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 16 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 16 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 16 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 16 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 16 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 16 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 16 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 17 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 17 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 17 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 17 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 17 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 17 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 17 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 17 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 17 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 17 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 17 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 18 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 18 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 18 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 18 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 18 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 18 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 18 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 18 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 18 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 18 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 19 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 19 09 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 19 14 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 19 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 19 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 19 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 19 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 19 44 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 19 49 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 19 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 20 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 20 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 20 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 20 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 20 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 20 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 20 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 20 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 20 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 20 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 20 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 21 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 21 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 21 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 21 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 21 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 21 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 21 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 21 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 21 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 21 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 22 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 22 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 22 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 22 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 22 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 22 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 22 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 22 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 22 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 22 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 23 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 23 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 23 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 23 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 23 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 23 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 23 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 23 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 01 23 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 02 00 09 55 31.3200 -97.3300 251.000 457.0 178.925 3.170 -999.990 -999.990 1.789 ..P WKT 2011 04 02 00 10 25 31.3200 -97.3300 251.000 457.0 178.835 3.450 -999.990 -999.990 1.788 ..P WKT 2011 04 02 00 10 55 31.3200 -97.3300 251.000 457.0 188.852 3.710 -999.990 -999.990 1.889 ..P WKT 2011 04 02 00 11 25 31.3200 -97.3300 251.000 457.0 188.436 3.930 -999.990 -999.990 1.884 ..P WKT 2011 04 02 00 11 55 31.3200 -97.3300 251.000 457.0 185.085 3.120 -999.990 -999.990 1.851 ..P WKT 2011 04 02 00 12 25 31.3200 -97.3300 251.000 457.0 186.298 3.190 -999.990 -999.990 1.863 ..P WKT 2011 04 02 00 12 55 31.3200 -97.3300 251.000 457.0 188.164 3.200 -999.990 -999.990 1.882 ..P WKT 2011 04 02 00 13 25 31.3200 -97.3300 251.000 457.0 180.900 5.360 -999.990 -999.990 1.809 ..P WKT 2011 04 02 00 13 55 31.3200 -97.3300 251.000 457.0 176.570 3.970 -999.990 -999.990 1.766 ..P WKT 2011 04 02 00 14 25 31.3200 -97.3300 251.000 457.0 182.349 3.480 -999.990 -999.990 1.823 ..P WKT 2011 04 02 00 14 55 31.3200 -97.3300 251.000 457.0 181.933 3.470 -999.990 -999.990 1.819 ..P WKT 2011 04 02 00 19 55 31.3200 -97.3300 251.000 30.0 181.353 4.270 -999.990 -999.990 1.814 ..P WKT 2011 04 02 00 24 55 31.3200 -97.3300 251.000 122.0 181.753 3.620 -999.990 -999.990 1.818 ..P WKT 2011 04 02 00 29 55 31.3200 -97.3300 251.000 457.0 178.236 3.850 -999.990 -999.990 1.782 ..P WKT 2011 04 02 00 34 55 31.3200 -97.3300 251.000 30.0 172.434 4.070 -999.990 -999.990 1.724 ..P WKT 2011 04 02 00 39 55 31.3200 -97.3300 251.000 122.0 175.769 3.110 -999.990 -999.990 1.758 ..P WKT 2011 04 02 00 44 55 31.3200 -97.3300 251.000 457.0 169.965 3.050 -999.990 -999.990 1.700 ..P WKT 2011 04 02 00 54 55 31.3200 -97.3300 251.000 30.0 173.593 3.080 -999.990 -999.990 1.736 ..P WKT 2011 04 02 00 59 55 31.3200 -97.3300 251.000 122.0 174.538 4.080 -999.990 -999.990 1.745 ..P WKT 2011 04 02 01 04 55 31.3200 -97.3300 251.000 457.0 176.138 4.400 -999.990 -999.990 1.761 ..P WKT 2011 04 02 01 09 55 31.3200 -97.3300 251.000 30.0 180.024 4.520 -999.990 -999.990 1.800 ..P WKT 2011 04 02 01 14 55 31.3200 -97.3300 251.000 122.0 180.807 3.940 -999.990 -999.990 1.808 ..P WKT 2011 04 02 01 19 55 31.3200 -97.3300 251.000 457.0 179.957 3.510 -999.990 -999.990 1.800 ..P WKT 2011 04 02 01 29 55 31.3200 -97.3300 251.000 30.0 180.007 4.450 -999.990 -999.990 1.800 ..P WKT 2011 04 02 01 34 55 31.3200 -97.3300 251.000 122.0 180.417 4.060 -999.990 -999.990 1.804 ..P WKT 2011 04 02 01 39 55 31.3200 -97.3300 251.000 457.0 184.262 4.500 -999.990 -999.990 1.843 ..P WKT 2011 04 02 01 44 55 31.3200 -97.3300 251.000 30.0 185.328 4.020 -999.990 -999.990 1.853 ..P WKT 2011 04 02 01 49 55 31.3200 -97.3300 251.000 122.0 189.012 4.670 -999.990 -999.990 1.890 ..P WKT 2011 04 02 01 54 55 31.3200 -97.3300 251.000 457.0 190.406 3.880 -999.990 -999.990 1.904 ..P WKT 2011 04 02 02 04 55 31.3200 -97.3300 251.000 30.0 199.464 3.210 -999.990 -999.990 1.995 ..P WKT 2011 04 02 02 09 55 31.3200 -97.3300 251.000 122.0 201.562 3.920 -999.990 -999.990 2.016 ..P WKT 2011 04 02 02 14 55 31.3200 -97.3300 251.000 457.0 196.128 4.790 -999.990 -999.990 1.961 ..P WKT 2011 04 02 02 19 55 31.3200 -97.3300 251.000 30.0 197.571 5.820 -999.990 -999.990 1.976 ..P WKT 2011 04 02 02 24 55 31.3200 -97.3300 251.000 122.0 201.965 4.800 -999.990 -999.990 2.020 ..P WKT 2011 04 02 02 29 55 31.3200 -97.3300 251.000 457.0 203.737 4.120 -999.990 -999.990 2.037 ..P WKT 2011 04 02 02 39 55 31.3200 -97.3300 251.000 30.0 200.120 3.700 -999.990 -999.990 2.001 ..P WKT 2011 04 02 02 44 55 31.3200 -97.3300 251.000 122.0 201.776 5.520 -999.990 -999.990 2.018 ..P WKT 2011 04 02 02 49 55 31.3200 -97.3300 251.000 457.0 200.809 5.860 -999.990 -999.990 2.008 ..P WKT 2011 04 02 02 54 55 31.3200 -97.3300 251.000 30.0 191.477 5.170 -999.990 -999.990 1.915 ..P WKT 2011 04 02 02 59 55 31.3200 -97.3300 251.000 122.0 193.953 4.080 -999.990 -999.990 1.940 ..P WKT 2011 04 02 03 04 55 31.3200 -97.3300 251.000 457.0 192.164 3.650 -999.990 -999.990 1.922 ..P WKT 2011 04 02 03 14 55 31.3200 -97.3300 251.000 30.0 188.631 3.120 -999.990 -999.990 1.886 ..P WKT 2011 04 02 03 19 55 31.3200 -97.3300 251.000 122.0 192.468 4.370 -999.990 -999.990 1.925 ..P WKT 2011 04 02 03 24 55 31.3200 -97.3300 251.000 457.0 197.292 4.520 -999.990 -999.990 1.973 ..P WKT 2011 04 02 03 29 55 31.3200 -97.3300 251.000 30.0 186.024 4.020 -999.990 -999.990 1.860 ..P WKT 2011 04 02 03 34 55 31.3200 -97.3300 251.000 122.0 191.505 4.950 -999.990 -999.990 1.915 ..P WKT 2011 04 02 03 39 55 31.3200 -97.3300 251.000 457.0 180.233 4.470 -999.990 -999.990 1.802 ..P WKT 2011 04 02 03 49 55 31.3200 -97.3300 251.000 30.0 184.297 2.720 -999.990 -999.990 1.843 ..P WKT 2011 04 02 03 54 55 31.3200 -97.3300 251.000 122.0 195.042 3.010 -999.990 -999.990 1.950 ..P WKT 2011 04 02 03 59 55 31.3200 -97.3300 251.000 457.0 186.063 2.990 -999.990 -999.990 1.861 ..P WKT 2011 04 02 04 04 55 31.3200 -97.3300 251.000 30.0 193.852 3.440 -999.990 -999.990 1.939 ..P WKT 2011 04 02 04 09 55 31.3200 -97.3300 251.000 122.0 198.684 3.380 -999.990 -999.990 1.987 ..P WKT 2011 04 02 04 14 55 31.3200 -97.3300 251.000 457.0 187.070 2.830 -999.990 -999.990 1.871 ..P WKT 2011 04 02 04 24 55 31.3200 -97.3300 251.000 30.0 191.447 2.950 -999.990 -999.990 1.914 ..P WKT 2011 04 02 04 29 55 31.3200 -97.3300 251.000 122.0 190.993 3.180 -999.990 -999.990 1.910 ..P WKT 2011 04 02 04 34 55 31.3200 -97.3300 251.000 457.0 177.369 3.090 -999.990 -999.990 1.774 ..P WKT 2011 04 02 04 39 55 31.3200 -97.3300 251.000 30.0 189.094 3.510 -999.990 -999.990 1.891 ..P WKT 2011 04 02 04 44 55 31.3200 -97.3300 251.000 122.0 190.944 3.670 -999.990 -999.990 1.909 ..P WKT 2011 04 02 04 49 55 31.3200 -97.3300 251.000 457.0 186.701 4.500 -999.990 -999.990 1.867 ..P WKT 2011 04 02 05 04 55 31.3200 -97.3300 251.000 30.0 185.085 3.900 -999.990 -999.990 1.851 ..P WKT 2011 04 02 05 09 55 31.3200 -97.3300 251.000 122.0 186.977 3.290 -999.990 -999.990 1.870 ..P WKT 2011 04 02 05 14 55 31.3200 -97.3300 251.000 457.0 189.858 3.860 -999.990 -999.990 1.899 ..P WKT 2011 04 02 05 19 55 31.3200 -97.3300 251.000 30.0 184.497 3.160 -999.990 -999.990 1.845 ..P WKT 2011 04 02 05 24 55 31.3200 -97.3300 251.000 122.0 179.299 4.540 -999.990 -999.990 1.793 ..P WKT 2011 04 02 05 29 55 31.3200 -97.3300 251.000 457.0 189.108 3.340 -999.990 -999.990 1.891 ..P WKT 2011 04 02 05 39 55 31.3200 -97.3300 251.000 30.0 178.831 3.560 -999.990 -999.990 1.788 ..P WKT 2011 04 02 05 44 55 31.3200 -97.3300 251.000 122.0 188.110 3.820 -999.990 -999.990 1.881 ..P WKT 2011 04 02 05 49 55 31.3200 -97.3300 251.000 457.0 186.993 3.900 -999.990 -999.990 1.870 ..P WKT 2011 04 02 05 54 55 31.3200 -97.3300 251.000 30.0 175.969 3.520 -999.990 -999.990 1.760 ..P WKT 2011 04 02 05 59 55 31.3200 -97.3300 251.000 122.0 197.141 3.070 -999.990 -999.990 1.971 ..P WKT 2011 04 02 06 04 55 31.3200 -97.3300 251.000 457.0 191.566 3.310 -999.990 -999.990 1.916 ..P WKT 2011 04 02 06 14 55 31.3200 -97.3300 251.000 30.0 181.117 3.250 -999.990 -999.990 1.811 ..P WKT 2011 04 02 06 19 55 31.3200 -97.3300 251.000 122.0 205.493 3.490 -999.990 -999.990 2.055 ..P WKT 2011 04 02 06 24 55 31.3200 -97.3300 251.000 457.0 185.914 3.420 -999.990 -999.990 1.859 ..P WKT 2011 04 02 06 29 55 31.3200 -97.3300 251.000 30.0 187.653 3.640 -999.990 -999.990 1.877 ..P WKT 2011 04 02 06 34 55 31.3200 -97.3300 251.000 122.0 187.243 3.640 -999.990 -999.990 1.872 ..P WKT 2011 04 02 06 39 55 31.3200 -97.3300 251.000 457.0 185.344 3.490 -999.990 -999.990 1.853 ..P WKT 2011 04 02 06 49 55 31.3200 -97.3300 251.000 30.0 171.003 3.580 -999.990 -999.990 1.710 ..P WKT 2011 04 02 06 54 55 31.3200 -97.3300 251.000 122.0 173.781 3.690 -999.990 -999.990 1.738 ..P WKT 2011 04 02 06 59 55 31.3200 -97.3300 251.000 457.0 181.523 3.330 -999.990 -999.990 1.815 ..P WKT 2011 04 02 07 04 55 31.3200 -97.3300 251.000 30.0 175.365 6.170 -999.990 -999.990 1.754 ..P WKT 2011 04 02 07 09 55 31.3200 -97.3300 251.000 122.0 178.807 3.250 -999.990 -999.990 1.788 ..P WKT 2011 04 02 07 14 55 31.3200 -97.3300 251.000 457.0 187.217 3.370 -999.990 -999.990 1.872 ..P WKT 2011 04 02 07 24 55 31.3200 -97.3300 251.000 30.0 175.083 3.260 -999.990 -999.990 1.751 ..P WKT 2011 04 02 07 29 55 31.3200 -97.3300 251.000 122.0 166.789 3.680 -999.990 -999.990 1.668 ..P WKT 2011 04 02 07 34 55 31.3200 -97.3300 251.000 457.0 188.980 3.930 -999.990 -999.990 1.890 ..P WKT 2011 04 02 07 39 55 31.3200 -97.3300 251.000 30.0 175.050 4.400 -999.990 -999.990 1.751 ..P WKT 2011 04 02 07 44 55 31.3200 -97.3300 251.000 122.0 183.990 4.350 -999.990 -999.990 1.840 ..P WKT 2011 04 02 07 49 55 31.3200 -97.3300 251.000 457.0 191.938 4.470 -999.990 -999.990 1.919 ..P WKT 2011 04 02 07 59 55 31.3200 -97.3300 251.000 30.0 176.759 4.880 -999.990 -999.990 1.768 ..P WKT 2011 04 02 08 04 55 31.3200 -97.3300 251.000 122.0 175.184 4.040 -999.990 -999.990 1.752 ..P WKT 2011 04 02 08 09 55 31.3200 -97.3300 251.000 457.0 195.176 3.830 -999.990 -999.990 1.952 ..P WKT 2011 04 02 08 14 55 31.3200 -97.3300 251.000 30.0 178.006 3.540 -999.990 -999.990 1.780 ..P WKT 2011 04 02 08 19 55 31.3200 -97.3300 251.000 122.0 176.430 3.460 -999.990 -999.990 1.764 ..P WKT 2011 04 02 08 24 55 31.3200 -97.3300 251.000 457.0 185.478 2.860 -999.990 -999.990 1.855 ..P WKT 2011 04 02 08 34 55 31.3200 -97.3300 251.000 30.0 168.379 2.680 -999.990 -999.990 1.684 ..P WKT 2011 04 02 08 39 55 31.3200 -97.3300 251.000 122.0 174.108 2.850 -999.990 -999.990 1.741 ..P WKT 2011 04 02 08 44 55 31.3200 -97.3300 251.000 457.0 197.283 3.070 -999.990 -999.990 1.973 ..P WKT 2011 04 02 08 49 55 31.3200 -97.3300 251.000 30.0 170.785 2.730 -999.990 -999.990 1.708 ..P WKT 2011 04 02 08 54 55 31.3200 -97.3300 251.000 122.0 176.519 3.850 -999.990 -999.990 1.765 ..P WKT 2011 04 02 08 59 55 31.3200 -97.3300 251.000 457.0 188.404 3.010 -999.990 -999.990 1.884 ..P WKT 2011 04 02 09 09 55 31.3200 -97.3300 251.000 30.0 172.922 3.200 -999.990 -999.990 1.729 ..P WKT 2011 04 02 09 14 55 31.3200 -97.3300 251.000 122.0 177.472 3.130 -999.990 -999.990 1.775 ..P WKT 2011 04 02 09 19 55 31.3200 -97.3300 251.000 457.0 189.177 4.290 -999.990 -999.990 1.892 ..P WKT 2011 04 02 09 24 55 31.3200 -97.3300 251.000 30.0 173.433 4.270 -999.990 -999.990 1.734 ..P WKT 2011 04 02 09 29 55 31.3200 -97.3300 251.000 122.0 171.497 4.050 -999.990 -999.990 1.715 ..P WKT 2011 04 02 09 34 55 31.3200 -97.3300 251.000 457.0 189.364 4.190 -999.990 -999.990 1.894 ..P WKT 2011 04 02 09 44 55 31.3200 -97.3300 251.000 30.0 174.362 3.690 -999.990 -999.990 1.744 ..P WKT 2011 04 02 09 49 55 31.3200 -97.3300 251.000 122.0 173.947 3.790 -999.990 -999.990 1.739 ..P WKT 2011 04 02 09 54 55 31.3200 -97.3300 251.000 457.0 185.690 4.380 -999.990 -999.990 1.857 ..P WKT 2011 04 02 09 59 55 31.3200 -97.3300 251.000 30.0 170.949 4.760 -999.990 -999.990 1.709 ..P WKT 2011 04 02 10 04 55 31.3200 -97.3300 251.000 122.0 176.863 3.870 -999.990 -999.990 1.769 ..P WKT 2011 04 02 10 09 55 31.3200 -97.3300 251.000 457.0 181.614 3.930 -999.990 -999.990 1.816 ..P WKT 2011 04 02 10 19 55 31.3200 -97.3300 251.000 30.0 167.947 3.490 -999.990 -999.990 1.679 ..P WKT 2011 04 02 10 24 55 31.3200 -97.3300 251.000 122.0 177.868 4.060 -999.990 -999.990 1.779 ..P WKT 2011 04 02 10 29 55 31.3200 -97.3300 251.000 457.0 184.623 4.410 -999.990 -999.990 1.846 ..P WKT 2011 04 02 10 34 55 31.3200 -97.3300 251.000 30.0 167.027 3.490 -999.990 -999.990 1.670 ..P WKT 2011 04 02 10 39 55 31.3200 -97.3300 251.000 122.0 173.450 4.360 -999.990 -999.990 1.734 ..P WKT 2011 04 02 10 44 55 31.3200 -97.3300 251.000 457.0 187.383 2.890 -999.990 -999.990 1.874 ..P WKT 2011 04 02 10 54 55 31.3200 -97.3300 251.000 30.0 172.318 3.920 -999.990 -999.990 1.723 ..P WKT 2011 04 02 10 59 55 31.3200 -97.3300 251.000 122.0 177.028 4.520 -999.990 -999.990 1.770 ..P WKT 2011 04 02 11 04 55 31.3200 -97.3300 251.000 457.0 187.085 3.740 -999.990 -999.990 1.871 ..P WKT 2011 04 02 11 09 55 31.3200 -97.3300 251.000 30.0 173.428 3.700 -999.990 -999.990 1.734 ..P WKT 2011 04 02 11 14 55 31.3200 -97.3300 251.000 122.0 173.129 3.330 -999.990 -999.990 1.731 ..P WKT 2011 04 02 11 19 55 31.3200 -97.3300 251.000 457.0 182.522 5.070 -999.990 -999.990 1.825 ..P WKT 2011 04 02 11 29 55 31.3200 -97.3300 251.000 30.0 165.047 3.650 -999.990 -999.990 1.650 ..P WKT 2011 04 02 11 34 55 31.3200 -97.3300 251.000 122.0 177.286 3.940 -999.990 -999.990 1.773 ..P WKT 2011 04 02 11 39 55 31.3200 -97.3300 251.000 457.0 184.847 4.550 -999.990 -999.990 1.848 ..P WKT 2011 04 02 11 44 55 31.3200 -97.3300 251.000 30.0 172.677 3.500 -999.990 -999.990 1.727 ..P WKT 2011 04 02 11 49 55 31.3200 -97.3300 251.000 122.0 179.571 3.780 -999.990 -999.990 1.796 ..P WKT 2011 04 02 12 09 55 31.3200 -97.3300 251.000 457.0 182.911 3.240 -999.990 -999.990 1.829 ..P WKT 2011 04 02 12 10 25 31.3200 -97.3300 251.000 457.0 180.914 3.220 -999.990 -999.990 1.809 ..P WKT 2011 04 02 12 10 55 31.3200 -97.3300 251.000 457.0 178.916 3.200 -999.990 -999.990 1.789 ..P WKT 2011 04 02 12 11 25 31.3200 -97.3300 251.000 457.0 181.604 3.350 -999.990 -999.990 1.816 ..P WKT 2011 04 02 12 11 55 31.3200 -97.3300 251.000 457.0 179.271 3.800 -999.990 -999.990 1.793 ..P WKT 2011 04 02 12 12 25 31.3200 -97.3300 251.000 457.0 181.289 3.230 -999.990 -999.990 1.813 ..P WKT 2011 04 02 12 12 55 31.3200 -97.3300 251.000 457.0 180.965 4.790 -999.990 -999.990 1.810 ..P WKT 2011 04 02 12 13 25 31.3200 -97.3300 251.000 457.0 178.633 6.200 -999.990 -999.990 1.786 ..P WKT 2011 04 02 12 13 55 31.3200 -97.3300 251.000 457.0 174.963 3.990 -999.990 -999.990 1.750 ..P WKT 2011 04 02 12 14 25 31.3200 -97.3300 251.000 457.0 178.319 3.290 -999.990 -999.990 1.783 ..P WKT 2011 04 02 12 14 55 31.3200 -97.3300 251.000 457.0 184.352 3.960 -999.990 -999.990 1.844 ..P WKT 2011 04 02 12 19 55 31.3200 -97.3300 251.000 30.0 173.413 3.860 -999.990 -999.990 1.734 ..P WKT 2011 04 02 12 24 55 31.3200 -97.3300 251.000 122.0 179.538 4.330 -999.990 -999.990 1.795 ..P WKT 2011 04 02 12 29 55 31.3200 -97.3300 251.000 457.0 174.958 4.110 -999.990 -999.990 1.750 ..P WKT 2011 04 02 12 34 55 31.3200 -97.3300 251.000 30.0 177.736 2.920 -999.990 -999.990 1.777 ..P WKT 2011 04 02 12 39 55 31.3200 -97.3300 251.000 122.0 175.164 2.850 -999.990 -999.990 1.752 ..P WKT 2011 04 02 12 44 55 31.3200 -97.3300 251.000 457.0 183.125 3.180 -999.990 -999.990 1.831 ..P WKT 2011 04 02 12 54 55 31.3200 -97.3300 251.000 30.0 170.846 2.990 -999.990 -999.990 1.708 ..P WKT 2011 04 02 12 59 55 31.3200 -97.3300 251.000 122.0 176.355 2.950 -999.990 -999.990 1.764 ..P WKT 2011 04 02 13 04 55 31.3200 -97.3300 251.000 457.0 181.527 3.210 -999.990 -999.990 1.815 ..P WKT 2011 04 02 13 09 55 31.3200 -97.3300 251.000 30.0 176.337 3.850 -999.990 -999.990 1.763 ..P WKT 2011 04 02 13 14 55 31.3200 -97.3300 251.000 122.0 178.835 4.470 -999.990 -999.990 1.788 ..P WKT 2011 04 02 13 19 55 31.3200 -97.3300 251.000 457.0 185.009 3.980 -999.990 -999.990 1.850 ..P WKT 2011 04 02 13 29 55 31.3200 -97.3300 251.000 30.0 176.589 2.820 -999.990 -999.990 1.766 ..P WKT 2011 04 02 13 34 55 31.3200 -97.3300 251.000 122.0 174.193 3.750 -999.990 -999.990 1.742 ..P WKT 2011 04 02 13 39 55 31.3200 -97.3300 251.000 457.0 189.170 4.350 -999.990 -999.990 1.892 ..P WKT 2011 04 02 13 44 55 31.3200 -97.3300 251.000 30.0 185.940 3.620 -999.990 -999.990 1.859 ..P WKT 2011 04 02 13 49 55 31.3200 -97.3300 251.000 122.0 186.049 5.000 -999.990 -999.990 1.860 ..P WKT 2011 04 02 13 54 55 31.3200 -97.3300 251.000 457.0 177.141 4.930 -999.990 -999.990 1.771 ..P WKT 2011 04 02 14 04 55 31.3200 -97.3300 251.000 30.0 188.667 4.860 -999.990 -999.990 1.887 ..P WKT 2011 04 02 14 09 55 31.3200 -97.3300 251.000 122.0 185.056 4.850 -999.990 -999.990 1.851 ..P WKT 2011 04 02 14 14 55 31.3200 -97.3300 251.000 457.0 180.778 4.330 -999.990 -999.990 1.808 ..P WKT 2011 04 02 14 19 55 31.3200 -97.3300 251.000 30.0 180.172 4.870 -999.990 -999.990 1.802 ..P WKT 2011 04 02 14 24 55 31.3200 -97.3300 251.000 122.0 179.901 4.560 -999.990 -999.990 1.799 ..P WKT 2011 04 02 14 29 55 31.3200 -97.3300 251.000 457.0 178.962 4.420 -999.990 -999.990 1.790 ..P WKT 2011 04 02 14 39 55 31.3200 -97.3300 251.000 30.0 179.350 5.920 -999.990 -999.990 1.793 ..P WKT 2011 04 02 14 44 55 31.3200 -97.3300 251.000 122.0 183.512 4.020 -999.990 -999.990 1.835 ..P WKT 2011 04 02 14 49 55 31.3200 -97.3300 251.000 457.0 175.495 3.670 -999.990 -999.990 1.755 ..P WKT 2011 04 02 14 54 55 31.3200 -97.3300 251.000 30.0 174.486 3.600 -999.990 -999.990 1.745 ..P WKT 2011 04 02 14 59 55 31.3200 -97.3300 251.000 122.0 187.154 5.950 -999.990 -999.990 1.872 ..P WKT 2011 04 02 15 04 55 31.3200 -97.3300 251.000 457.0 181.473 3.560 -999.990 -999.990 1.815 ..P WKT 2011 04 02 15 14 55 31.3200 -97.3300 251.000 30.0 182.360 2.840 -999.990 -999.990 1.824 ..P WKT 2011 04 02 15 19 55 31.3200 -97.3300 251.000 122.0 188.258 2.970 -999.990 -999.990 1.883 ..P WKT 2011 04 02 15 24 55 31.3200 -97.3300 251.000 457.0 187.153 5.080 -999.990 -999.990 1.872 ..P WKT 2011 04 02 15 29 55 31.3200 -97.3300 251.000 30.0 183.047 3.620 -999.990 -999.990 1.830 ..P WKT 2011 04 02 15 34 55 31.3200 -97.3300 251.000 122.0 183.609 3.290 -999.990 -999.990 1.836 ..P WKT 2011 04 02 15 39 55 31.3200 -97.3300 251.000 457.0 178.838 3.460 -999.990 -999.990 1.788 ..P WKT 2011 04 02 15 49 55 31.3200 -97.3300 251.000 30.0 180.581 3.120 -999.990 -999.990 1.806 ..P WKT 2011 04 02 15 54 55 31.3200 -97.3300 251.000 122.0 181.095 3.520 -999.990 -999.990 1.811 ..P WKT 2011 04 02 15 59 55 31.3200 -97.3300 251.000 457.0 179.944 3.220 -999.990 -999.990 1.799 ..P WKT 2011 04 02 16 04 55 31.3200 -97.3300 251.000 30.0 182.458 3.530 -999.990 -999.990 1.825 ..P WKT 2011 04 02 16 09 55 31.3200 -97.3300 251.000 122.0 181.306 4.850 -999.990 -999.990 1.813 ..P WKT 2011 04 02 16 14 55 31.3200 -97.3300 251.000 457.0 185.151 3.240 -999.990 -999.990 1.852 ..P WKT 2011 04 02 16 24 55 31.3200 -97.3300 251.000 30.0 178.756 5.000 -999.990 -999.990 1.788 ..P WKT 2011 04 02 16 29 55 31.3200 -97.3300 251.000 122.0 191.165 3.410 -999.990 -999.990 1.912 ..P WKT 2011 04 02 16 34 55 31.3200 -97.3300 251.000 457.0 182.259 3.720 -999.990 -999.990 1.823 ..P WKT 2011 04 02 16 39 55 31.3200 -97.3300 251.000 30.0 181.845 4.180 -999.990 -999.990 1.818 ..P WKT 2011 04 02 16 44 55 31.3200 -97.3300 251.000 122.0 185.427 4.230 -999.990 -999.990 1.854 ..P WKT 2011 04 02 16 49 55 31.3200 -97.3300 251.000 457.0 179.187 4.040 -999.990 -999.990 1.792 ..P WKT 2011 04 02 17 04 55 31.3200 -97.3300 251.000 30.0 182.668 4.490 -999.990 -999.990 1.827 ..P WKT 2011 04 02 17 09 55 31.3200 -97.3300 251.000 122.0 191.436 3.550 -999.990 -999.990 1.914 ..P WKT 2011 04 02 17 14 55 31.3200 -97.3300 251.000 457.0 182.232 3.720 -999.990 -999.990 1.822 ..P WKT 2011 04 02 17 19 55 31.3200 -97.3300 251.000 30.0 182.680 4.420 -999.990 -999.990 1.827 ..P WKT 2011 04 02 17 24 55 31.3200 -97.3300 251.000 122.0 189.451 2.650 -999.990 -999.990 1.895 ..P WKT 2011 04 02 17 29 55 31.3200 -97.3300 251.000 457.0 182.578 3.690 -999.990 -999.990 1.826 ..P WKT 2011 04 02 17 39 55 31.3200 -97.3300 251.000 30.0 180.974 2.540 -999.990 -999.990 1.810 ..P WKT 2011 04 02 17 44 55 31.3200 -97.3300 251.000 122.0 187.237 2.590 -999.990 -999.990 1.872 ..P WKT 2011 04 02 17 49 55 31.3200 -97.3300 251.000 457.0 188.677 2.800 -999.990 -999.990 1.887 ..P WKT 2011 04 02 17 54 55 31.3200 -97.3300 251.000 30.0 183.465 3.700 -999.990 -999.990 1.835 ..P WKT 2011 04 02 17 59 55 31.3200 -97.3300 251.000 122.0 186.235 3.770 -999.990 -999.990 1.862 ..P WKT 2011 04 02 18 04 55 31.3200 -97.3300 251.000 457.0 185.014 2.650 -999.990 -999.990 1.850 ..P WKT 2011 04 02 18 14 55 31.3200 -97.3300 251.000 30.0 182.169 4.410 -999.990 -999.990 1.822 ..P WKT 2011 04 02 18 19 55 31.3200 -97.3300 251.000 122.0 182.040 2.700 -999.990 -999.990 1.820 ..P WKT 2011 04 02 18 24 55 31.3200 -97.3300 251.000 457.0 187.231 3.720 -999.990 -999.990 1.872 ..P WKT 2011 04 02 18 29 55 31.3200 -97.3300 251.000 30.0 177.298 4.330 -999.990 -999.990 1.773 ..P WKT 2011 04 02 18 34 55 31.3200 -97.3300 251.000 122.0 180.161 3.370 -999.990 -999.990 1.802 ..P WKT 2011 04 02 18 39 55 31.3200 -97.3300 251.000 457.0 182.859 2.750 -999.990 -999.990 1.829 ..P WKT 2011 04 02 18 49 55 31.3200 -97.3300 251.000 30.0 181.013 2.530 -999.990 -999.990 1.810 ..P WKT 2011 04 02 18 54 55 31.3200 -97.3300 251.000 122.0 185.939 3.120 -999.990 -999.990 1.859 ..P WKT 2011 04 02 18 59 55 31.3200 -97.3300 251.000 457.0 183.225 3.000 -999.990 -999.990 1.832 ..P WKT 2011 04 02 19 04 55 31.3200 -97.3300 251.000 30.0 188.814 4.920 -999.990 -999.990 1.888 ..P WKT 2011 04 02 19 09 55 31.3200 -97.3300 251.000 122.0 184.107 5.120 -999.990 -999.990 1.841 ..P WKT 2011 04 02 19 14 55 31.3200 -97.3300 251.000 457.0 186.043 3.150 -999.990 -999.990 1.860 ..P WKT 2011 04 02 19 24 55 31.3200 -97.3300 251.000 30.0 173.739 2.360 -999.990 -999.990 1.737 ..P WKT 2011 04 02 19 29 55 31.3200 -97.3300 251.000 122.0 183.074 2.600 -999.990 -999.990 1.831 ..P WKT 2011 04 02 19 34 55 31.3200 -97.3300 251.000 457.0 174.149 4.040 -999.990 -999.990 1.741 ..P WKT 2011 04 02 19 39 55 31.3200 -97.3300 251.000 30.0 182.154 2.410 -999.990 -999.990 1.822 ..P WKT 2011 04 02 19 44 55 31.3200 -97.3300 251.000 122.0 178.541 2.570 -999.990 -999.990 1.785 ..P WKT 2011 04 02 19 49 55 31.3200 -97.3300 251.000 457.0 176.920 3.440 -999.990 -999.990 1.769 ..P WKT 2011 04 02 19 59 55 31.3200 -97.3300 251.000 30.0 180.102 2.390 -999.990 -999.990 1.801 ..P WKT 2011 04 02 20 04 55 31.3200 -97.3300 251.000 122.0 182.581 3.350 -999.990 -999.990 1.826 ..P WKT 2011 04 02 20 09 55 31.3200 -97.3300 251.000 457.0 176.103 2.320 -999.990 -999.990 1.761 ..P WKT 2011 04 02 20 14 55 31.3200 -97.3300 251.000 30.0 181.899 2.640 -999.990 -999.990 1.819 ..P WKT 2011 04 02 20 19 55 31.3200 -97.3300 251.000 122.0 180.730 4.430 -999.990 -999.990 1.807 ..P WKT 2011 04 02 20 24 55 31.3200 -97.3300 251.000 457.0 178.233 3.300 -999.990 -999.990 1.782 ..P WKT 2011 04 02 20 34 55 31.3200 -97.3300 251.000 30.0 173.525 4.080 -999.990 -999.990 1.735 ..P WKT 2011 04 02 20 39 55 31.3200 -97.3300 251.000 122.0 175.293 2.830 -999.990 -999.990 1.753 ..P WKT 2011 04 02 20 44 55 31.3200 -97.3300 251.000 457.0 171.258 3.000 -999.990 -999.990 1.713 ..P WKT 2011 04 02 20 49 55 31.3200 -97.3300 251.000 30.0 170.871 3.000 -999.990 -999.990 1.709 ..P WKT 2011 04 02 20 54 55 31.3200 -97.3300 251.000 122.0 168.661 3.840 -999.990 -999.990 1.687 ..P WKT 2011 04 02 20 59 55 31.3200 -97.3300 251.000 457.0 164.959 3.900 -999.990 -999.990 1.650 ..P WKT 2011 04 02 21 09 55 31.3200 -97.3300 251.000 30.0 175.478 3.420 -999.990 -999.990 1.755 ..P WKT 2011 04 02 21 14 55 31.3200 -97.3300 251.000 122.0 177.434 3.340 -999.990 -999.990 1.774 ..P WKT 2011 04 02 21 19 55 31.3200 -97.3300 251.000 457.0 173.923 4.280 -999.990 -999.990 1.739 ..P WKT 2011 04 02 21 24 55 31.3200 -97.3300 251.000 30.0 170.909 4.380 -999.990 -999.990 1.709 ..P WKT 2011 04 02 21 29 55 31.3200 -97.3300 251.000 122.0 172.865 2.940 -999.990 -999.990 1.729 ..P WKT 2011 04 02 21 34 55 31.3200 -97.3300 251.000 457.0 167.698 3.930 -999.990 -999.990 1.677 ..P WKT 2011 04 02 21 44 55 31.3200 -97.3300 251.000 30.0 170.332 3.390 -999.990 -999.990 1.703 ..P WKT 2011 04 02 21 49 55 31.3200 -97.3300 251.000 122.0 170.678 3.090 -999.990 -999.990 1.707 ..P WKT 2011 04 02 21 54 55 31.3200 -97.3300 251.000 457.0 168.210 3.370 -999.990 -999.990 1.682 ..P WKT 2011 04 02 21 59 55 31.3200 -97.3300 251.000 30.0 170.378 3.810 -999.990 -999.990 1.704 ..P WKT 2011 04 02 22 04 55 31.3200 -97.3300 251.000 122.0 179.498 2.810 -999.990 -999.990 1.795 ..P WKT 2011 04 02 22 09 55 31.3200 -97.3300 251.000 457.0 172.892 2.430 -999.990 -999.990 1.729 ..P WKT 2011 04 02 22 19 55 31.3200 -97.3300 251.000 30.0 169.730 2.620 -999.990 -999.990 1.697 ..P WKT 2011 04 02 22 24 55 31.3200 -97.3300 251.000 122.0 169.533 3.030 -999.990 -999.990 1.695 ..P WKT 2011 04 02 22 29 55 31.3200 -97.3300 251.000 457.0 158.911 3.680 -999.990 -999.990 1.589 ..P WKT 2011 04 02 22 34 55 31.3200 -97.3300 251.000 30.0 167.815 3.130 -999.990 -999.990 1.678 ..P WKT 2011 04 02 22 39 55 31.3200 -97.3300 251.000 122.0 166.791 2.740 -999.990 -999.990 1.668 ..P WKT 2011 04 02 22 44 55 31.3200 -97.3300 251.000 457.0 166.760 3.410 -999.990 -999.990 1.668 ..P WKT 2011 04 02 22 54 55 31.3200 -97.3300 251.000 30.0 162.373 6.140 -999.990 -999.990 1.624 ..P WKT 2011 04 02 22 59 55 31.3200 -97.3300 251.000 122.0 176.540 2.790 -999.990 -999.990 1.765 ..P WKT 2011 04 02 23 04 55 31.3200 -97.3300 251.000 457.0 171.524 2.790 -999.990 -999.990 1.715 ..P WKT 2011 04 02 23 09 55 31.3200 -97.3300 251.000 30.0 172.792 2.600 -999.990 -999.990 1.728 ..P WKT 2011 04 02 23 14 55 31.3200 -97.3300 251.000 122.0 174.720 2.650 -999.990 -999.990 1.747 ..P WKT 2011 04 02 23 19 55 31.3200 -97.3300 251.000 457.0 173.672 3.340 -999.990 -999.990 1.737 ..P WKT 2011 04 02 23 29 55 31.3200 -97.3300 251.000 30.0 170.385 2.850 -999.990 -999.990 1.704 ..P WKT 2011 04 02 23 34 55 31.3200 -97.3300 251.000 122.0 177.071 3.230 -999.990 -999.990 1.771 ..P WKT 2011 04 02 23 39 55 31.3200 -97.3300 251.000 457.0 168.550 2.900 -999.990 -999.990 1.686 ..P WKT 2011 04 02 23 44 55 31.3200 -97.3300 251.000 30.0 169.286 4.370 -999.990 -999.990 1.693 ..P WKT 2011 04 02 23 49 55 31.3200 -97.3300 251.000 122.0 177.622 3.100 -999.990 -999.990 1.776 ..P WKT 2011 04 03 00 09 55 31.3200 -97.3300 251.000 457.0 177.112 2.080 -999.990 -999.990 1.771 ..P WKT 2011 04 03 00 10 25 31.3200 -97.3300 251.000 457.0 174.162 2.220 -999.990 -999.990 1.742 ..P WKT 2011 04 03 00 10 55 31.3200 -97.3300 251.000 457.0 173.524 2.900 -999.990 -999.990 1.735 ..P WKT 2011 04 03 00 11 25 31.3200 -97.3300 251.000 457.0 181.810 2.190 -999.990 -999.990 1.818 ..P WKT 2011 04 03 00 11 55 31.3200 -97.3300 251.000 457.0 177.206 2.530 -999.990 -999.990 1.772 ..P WKT 2011 04 03 00 12 25 31.3200 -97.3300 251.000 457.0 179.874 2.720 -999.990 -999.990 1.799 ..P WKT 2011 04 03 00 12 55 31.3200 -97.3300 251.000 457.0 178.906 2.720 -999.990 -999.990 1.789 ..P WKT 2011 04 03 00 13 25 31.3200 -97.3300 251.000 457.0 183.226 3.260 -999.990 -999.990 1.832 ..P WKT 2011 04 03 00 13 55 31.3200 -97.3300 251.000 457.0 177.962 2.840 -999.990 -999.990 1.780 ..P WKT 2011 04 03 00 14 25 31.3200 -97.3300 251.000 457.0 180.298 2.710 -999.990 -999.990 1.803 ..P WKT 2011 04 03 00 14 55 31.3200 -97.3300 251.000 457.0 179.000 3.750 -999.990 -999.990 1.790 ..P WKT 2011 04 03 00 19 55 31.3200 -97.3300 251.000 30.0 179.566 3.100 -999.990 -999.990 1.796 ..P WKT 2011 04 03 00 24 55 31.3200 -97.3300 251.000 122.0 186.081 2.410 -999.990 -999.990 1.861 ..P WKT 2011 04 03 00 29 55 31.3200 -97.3300 251.000 457.0 175.740 2.410 -999.990 -999.990 1.757 ..P WKT 2011 04 03 00 34 55 31.3200 -97.3300 251.000 30.0 178.289 2.840 -999.990 -999.990 1.783 ..P WKT 2011 04 03 00 39 55 31.3200 -97.3300 251.000 122.0 176.871 3.110 -999.990 -999.990 1.769 ..P WKT 2011 04 03 00 44 55 31.3200 -97.3300 251.000 457.0 180.910 3.620 -999.990 -999.990 1.809 ..P WKT 2011 04 03 00 54 55 31.3200 -97.3300 251.000 30.0 177.333 3.020 -999.990 -999.990 1.773 ..P WKT 2011 04 03 00 59 55 31.3200 -97.3300 251.000 122.0 181.625 3.630 -999.990 -999.990 1.816 ..P WKT 2011 04 03 01 04 55 31.3200 -97.3300 251.000 457.0 177.482 3.560 -999.990 -999.990 1.775 ..P WKT 2011 04 03 01 09 55 31.3200 -97.3300 251.000 30.0 181.773 5.920 -999.990 -999.990 1.818 ..P WKT 2011 04 03 01 14 55 31.3200 -97.3300 251.000 122.0 187.223 3.920 -999.990 -999.990 1.872 ..P WKT 2011 04 03 01 19 55 31.3200 -97.3300 251.000 457.0 176.132 4.050 -999.990 -999.990 1.761 ..P WKT 2011 04 03 01 29 55 31.3200 -97.3300 251.000 30.0 176.682 4.120 -999.990 -999.990 1.767 ..P WKT 2011 04 03 01 34 55 31.3200 -97.3300 251.000 122.0 179.888 3.960 -999.990 -999.990 1.799 ..P WKT 2011 04 03 01 39 55 31.3200 -97.3300 251.000 457.0 166.547 4.710 -999.990 -999.990 1.665 ..P WKT 2011 04 03 01 44 55 31.3200 -97.3300 251.000 30.0 171.077 3.650 -999.990 -999.990 1.711 ..P WKT 2011 04 03 01 49 55 31.3200 -97.3300 251.000 122.0 175.110 4.470 -999.990 -999.990 1.751 ..P WKT 2011 04 03 01 54 55 31.3200 -97.3300 251.000 457.0 171.035 2.940 -999.990 -999.990 1.710 ..P WKT 2011 04 03 02 04 55 31.3200 -97.3300 251.000 30.0 165.837 3.740 -999.990 -999.990 1.658 ..P WKT 2011 04 03 02 09 55 31.3200 -97.3300 251.000 122.0 167.035 3.580 -999.990 -999.990 1.670 ..P WKT 2011 04 03 02 14 55 31.3200 -97.3300 251.000 457.0 174.357 3.810 -999.990 -999.990 1.744 ..P WKT 2011 04 03 02 19 55 31.3200 -97.3300 251.000 30.0 174.891 3.480 -999.990 -999.990 1.749 ..P WKT 2011 04 03 02 24 55 31.3200 -97.3300 251.000 122.0 183.044 2.590 -999.990 -999.990 1.830 ..P WKT 2011 04 03 02 29 55 31.3200 -97.3300 251.000 457.0 172.319 3.530 -999.990 -999.990 1.723 ..P WKT 2011 04 03 02 39 55 31.3200 -97.3300 251.000 30.0 176.158 2.340 -999.990 -999.990 1.762 ..P WKT 2011 04 03 02 44 55 31.3200 -97.3300 251.000 122.0 170.020 2.500 -999.990 -999.990 1.700 ..P WKT 2011 04 03 02 49 55 31.3200 -97.3300 251.000 457.0 186.742 3.470 -999.990 -999.990 1.867 ..P WKT 2011 04 03 02 54 55 31.3200 -97.3300 251.000 30.0 174.640 4.280 -999.990 -999.990 1.746 ..P WKT 2011 04 03 02 59 55 31.3200 -97.3300 251.000 122.0 176.785 3.680 -999.990 -999.990 1.768 ..P WKT 2011 04 03 03 04 55 31.3200 -97.3300 251.000 457.0 207.098 4.310 -999.990 -999.990 2.071 ..P WKT 2011 04 03 03 14 55 31.3200 -97.3300 251.000 30.0 167.550 4.740 -999.990 -999.990 1.676 ..P WKT 2011 04 03 03 19 55 31.3200 -97.3300 251.000 122.0 174.572 4.120 -999.990 -999.990 1.746 ..P WKT 2011 04 03 03 24 55 31.3200 -97.3300 251.000 457.0 164.027 4.150 -999.990 -999.990 1.640 ..P WKT 2011 04 03 03 29 55 31.3200 -97.3300 251.000 30.0 167.072 4.040 -999.990 -999.990 1.671 ..P WKT 2011 04 03 03 34 55 31.3200 -97.3300 251.000 122.0 175.422 3.340 -999.990 -999.990 1.754 ..P WKT 2011 04 03 03 39 55 31.3200 -97.3300 251.000 457.0 162.553 3.640 -999.990 -999.990 1.626 ..P WKT 2011 04 03 03 49 55 31.3200 -97.3300 251.000 30.0 174.424 3.260 -999.990 -999.990 1.744 ..P WKT 2011 04 03 03 54 55 31.3200 -97.3300 251.000 122.0 170.649 3.290 -999.990 -999.990 1.706 ..P WKT 2011 04 03 03 59 55 31.3200 -97.3300 251.000 457.0 153.274 3.100 -999.990 -999.990 1.533 ..P WKT 2011 04 03 04 04 55 31.3200 -97.3300 251.000 30.0 177.359 3.180 -999.990 -999.990 1.774 ..P WKT 2011 04 03 04 09 55 31.3200 -97.3300 251.000 122.0 171.261 3.980 -999.990 -999.990 1.713 ..P WKT 2011 04 03 04 14 55 31.3200 -97.3300 251.000 457.0 169.806 3.180 -999.990 -999.990 1.698 ..P WKT 2011 04 03 04 24 55 31.3200 -97.3300 251.000 30.0 176.566 3.040 -999.990 -999.990 1.766 ..P WKT 2011 04 03 04 29 55 31.3200 -97.3300 251.000 122.0 170.679 3.330 -999.990 -999.990 1.707 ..P WKT 2011 04 03 04 34 55 31.3200 -97.3300 251.000 457.0 175.079 3.750 -999.990 -999.990 1.751 ..P WKT 2011 04 03 04 39 55 31.3200 -97.3300 251.000 30.0 167.863 2.630 -999.990 -999.990 1.679 ..P WKT 2011 04 03 04 44 55 31.3200 -97.3300 251.000 122.0 167.120 2.430 -999.990 -999.990 1.671 ..P WKT 2011 04 03 04 49 55 31.3200 -97.3300 251.000 457.0 178.823 2.750 -999.990 -999.990 1.788 ..P WKT 2011 04 03 05 04 55 31.3200 -97.3300 251.000 30.0 170.930 3.610 -999.990 -999.990 1.709 ..P WKT 2011 04 03 05 09 55 31.3200 -97.3300 251.000 122.0 171.255 2.820 -999.990 -999.990 1.713 ..P WKT 2011 04 03 05 14 55 31.3200 -97.3300 251.000 457.0 170.086 5.350 -999.990 -999.990 1.701 ..P WKT 2011 04 03 05 19 55 31.3200 -97.3300 251.000 30.0 166.428 2.750 -999.990 -999.990 1.664 ..P WKT 2011 04 03 05 24 55 31.3200 -97.3300 251.000 122.0 164.760 2.760 -999.990 -999.990 1.648 ..P WKT 2011 04 03 05 29 55 31.3200 -97.3300 251.000 457.0 170.234 3.420 -999.990 -999.990 1.702 ..P WKT 2011 04 03 05 39 55 31.3200 -97.3300 251.000 30.0 161.249 2.910 -999.990 -999.990 1.612 ..P WKT 2011 04 03 05 44 55 31.3200 -97.3300 251.000 122.0 165.060 3.700 -999.990 -999.990 1.651 ..P WKT 2011 04 03 05 49 55 31.3200 -97.3300 251.000 457.0 154.750 3.720 -999.990 -999.990 1.548 ..P WKT 2011 04 03 05 54 55 31.3200 -97.3300 251.000 30.0 160.721 4.390 -999.990 -999.990 1.607 ..P WKT 2011 04 03 05 59 55 31.3200 -97.3300 251.000 122.0 166.028 3.140 -999.990 -999.990 1.660 ..P WKT 2011 04 03 06 04 55 31.3200 -97.3300 251.000 457.0 158.042 4.190 -999.990 -999.990 1.580 ..P WKT 2011 04 03 06 14 55 31.3200 -97.3300 251.000 30.0 157.832 3.630 -999.990 -999.990 1.578 ..P WKT 2011 04 03 06 19 55 31.3200 -97.3300 251.000 122.0 163.615 3.450 -999.990 -999.990 1.636 ..P WKT 2011 04 03 06 24 55 31.3200 -97.3300 251.000 457.0 152.611 3.400 -999.990 -999.990 1.526 ..P WKT 2011 04 03 06 29 55 31.3200 -97.3300 251.000 30.0 158.894 3.200 -999.990 -999.990 1.589 ..P WKT 2011 04 03 06 34 55 31.3200 -97.3300 251.000 122.0 162.517 3.050 -999.990 -999.990 1.625 ..P WKT 2011 04 03 06 39 55 31.3200 -97.3300 251.000 457.0 151.511 2.880 -999.990 -999.990 1.515 ..P WKT 2011 04 03 06 49 55 31.3200 -97.3300 251.000 30.0 155.147 2.760 -999.990 -999.990 1.551 ..P WKT 2011 04 03 06 54 55 31.3200 -97.3300 251.000 122.0 157.156 2.660 -999.990 -999.990 1.572 ..P WKT 2011 04 03 06 59 55 31.3200 -97.3300 251.000 457.0 149.186 2.330 -999.990 -999.990 1.492 ..P WKT 2011 04 03 07 04 55 31.3200 -97.3300 251.000 30.0 156.517 2.560 -999.990 -999.990 1.565 ..P WKT 2011 04 03 07 09 55 31.3200 -97.3300 251.000 122.0 156.530 2.270 -999.990 -999.990 1.565 ..P WKT 2011 04 03 07 14 55 31.3200 -97.3300 251.000 457.0 149.557 3.000 -999.990 -999.990 1.496 ..P WKT 2011 04 03 07 24 55 31.3200 -97.3300 251.000 30.0 154.051 2.060 -999.990 -999.990 1.541 ..P WKT 2011 04 03 07 29 55 31.3200 -97.3300 251.000 122.0 157.867 2.600 -999.990 -999.990 1.579 ..P WKT 2011 04 03 07 34 55 31.3200 -97.3300 251.000 457.0 151.700 3.010 -999.990 -999.990 1.517 ..P WKT 2011 04 03 07 39 55 31.3200 -97.3300 251.000 30.0 156.183 2.580 -999.990 -999.990 1.562 ..P WKT 2011 04 03 07 44 55 31.3200 -97.3300 251.000 122.0 153.011 1.950 -999.990 -999.990 1.530 ..P WKT 2011 04 03 07 49 55 31.3200 -97.3300 251.000 457.0 153.166 2.440 -999.990 -999.990 1.532 ..P WKT 2011 04 03 07 59 55 31.3200 -97.3300 251.000 30.0 162.515 2.680 -999.990 -999.990 1.625 ..P WKT 2011 04 03 08 04 55 31.3200 -97.3300 251.000 122.0 163.718 2.750 -999.990 -999.990 1.637 ..P WKT 2011 04 03 08 09 55 31.3200 -97.3300 251.000 457.0 161.925 4.540 -999.990 -999.990 1.619 ..P WKT 2011 04 03 08 14 55 31.3200 -97.3300 251.000 30.0 160.463 2.340 -999.990 -999.990 1.605 ..P WKT 2011 04 03 08 19 55 31.3200 -97.3300 251.000 122.0 164.331 3.000 -999.990 -999.990 1.643 ..P WKT 2011 04 03 08 24 55 31.3200 -97.3300 251.000 457.0 151.712 3.230 -999.990 -999.990 1.517 ..P WKT 2011 04 03 08 34 55 31.3200 -97.3300 251.000 30.0 156.378 4.490 -999.990 -999.990 1.564 ..P WKT 2011 04 03 08 39 55 31.3200 -97.3300 251.000 122.0 155.011 2.630 -999.990 -999.990 1.550 ..P WKT 2011 04 03 08 44 55 31.3200 -97.3300 251.000 457.0 157.975 2.440 -999.990 -999.990 1.580 ..P WKT 2011 04 03 08 49 55 31.3200 -97.3300 251.000 30.0 157.942 2.350 -999.990 -999.990 1.579 ..P WKT 2011 04 03 08 54 55 31.3200 -97.3300 251.000 122.0 160.740 3.550 -999.990 -999.990 1.607 ..P WKT 2011 04 03 08 59 55 31.3200 -97.3300 251.000 457.0 156.374 3.030 -999.990 -999.990 1.564 ..P WKT 2011 04 03 09 09 55 31.3200 -97.3300 251.000 30.0 158.019 2.070 -999.990 -999.990 1.580 ..P WKT 2011 04 03 09 14 55 31.3200 -97.3300 251.000 122.0 155.533 3.190 -999.990 -999.990 1.555 ..P WKT 2011 04 03 09 19 55 31.3200 -97.3300 251.000 457.0 159.714 2.410 -999.990 -999.990 1.597 ..P WKT 2011 04 03 09 24 55 31.3200 -97.3300 251.000 30.0 160.561 4.030 -999.990 -999.990 1.606 ..P WKT 2011 04 03 09 29 55 31.3200 -97.3300 251.000 122.0 160.241 3.360 -999.990 -999.990 1.602 ..P WKT 2011 04 03 09 34 55 31.3200 -97.3300 251.000 457.0 159.088 3.640 -999.990 -999.990 1.591 ..P WKT 2011 04 03 09 44 55 31.3200 -97.3300 251.000 30.0 158.972 3.440 -999.990 -999.990 1.590 ..P WKT 2011 04 03 09 49 55 31.3200 -97.3300 251.000 122.0 151.339 2.470 -999.990 -999.990 1.513 ..P WKT 2011 04 03 09 54 55 31.3200 -97.3300 251.000 457.0 156.712 2.620 -999.990 -999.990 1.567 ..P WKT 2011 04 03 09 59 55 31.3200 -97.3300 251.000 30.0 157.083 2.570 -999.990 -999.990 1.571 ..P WKT 2011 04 03 10 04 55 31.3200 -97.3300 251.000 122.0 158.288 2.490 -999.990 -999.990 1.583 ..P WKT 2011 04 03 10 09 55 31.3200 -97.3300 251.000 457.0 166.332 2.770 -999.990 -999.990 1.663 ..P WKT 2011 04 03 10 19 55 31.3200 -97.3300 251.000 30.0 154.443 2.880 -999.990 -999.990 1.544 ..P WKT 2011 04 03 10 24 55 31.3200 -97.3300 251.000 122.0 158.699 4.480 -999.990 -999.990 1.587 ..P WKT 2011 04 03 10 29 55 31.3200 -97.3300 251.000 457.0 154.780 3.090 -999.990 -999.990 1.548 ..P WKT 2011 04 03 10 34 55 31.3200 -97.3300 251.000 30.0 152.195 2.530 -999.990 -999.990 1.522 ..P WKT 2011 04 03 10 39 55 31.3200 -97.3300 251.000 122.0 151.945 4.620 -999.990 -999.990 1.519 ..P WKT 2011 04 03 10 44 55 31.3200 -97.3300 251.000 457.0 153.366 5.250 -999.990 -999.990 1.534 ..P WKT 2011 04 03 10 54 55 31.3200 -97.3300 251.000 30.0 160.332 2.930 -999.990 -999.990 1.603 ..P WKT 2011 04 03 10 59 55 31.3200 -97.3300 251.000 122.0 158.867 4.410 -999.990 -999.990 1.589 ..P WKT 2011 04 03 11 04 55 31.3200 -97.3300 251.000 457.0 154.062 2.830 -999.990 -999.990 1.541 ..P WKT 2011 04 03 11 09 55 31.3200 -97.3300 251.000 30.0 163.951 2.680 -999.990 -999.990 1.640 ..P WKT 2011 04 03 11 14 55 31.3200 -97.3300 251.000 122.0 159.815 2.120 -999.990 -999.990 1.598 ..P WKT 2011 04 03 11 19 55 31.3200 -97.3300 251.000 457.0 159.017 3.060 -999.990 -999.990 1.590 ..P WKT 2011 04 03 11 29 55 31.3200 -97.3300 251.000 30.0 154.892 2.470 -999.990 -999.990 1.549 ..P WKT 2011 04 03 11 34 55 31.3200 -97.3300 251.000 122.0 157.913 2.050 -999.990 -999.990 1.579 ..P WKT 2011 04 03 11 39 55 31.3200 -97.3300 251.000 457.0 162.604 2.760 -999.990 -999.990 1.626 ..P WKT 2011 04 03 11 44 55 31.3200 -97.3300 251.000 30.0 153.261 2.600 -999.990 -999.990 1.533 ..P WKT 2011 04 03 11 49 55 31.3200 -97.3300 251.000 122.0 150.936 2.490 -999.990 -999.990 1.509 ..P WKT 2011 04 03 12 09 55 31.3200 -97.3300 251.000 457.0 157.193 2.490 -999.990 -999.990 1.572 ..P WKT 2011 04 03 12 10 25 31.3200 -97.3300 251.000 457.0 158.890 2.760 -999.990 -999.990 1.589 ..P WKT 2011 04 03 12 10 55 31.3200 -97.3300 251.000 457.0 156.244 3.300 -999.990 -999.990 1.562 ..P WKT 2011 04 03 12 11 25 31.3200 -97.3300 251.000 457.0 160.949 3.330 -999.990 -999.990 1.609 ..P WKT 2011 04 03 12 11 55 31.3200 -97.3300 251.000 457.0 156.631 3.060 -999.990 -999.990 1.566 ..P WKT 2011 04 03 12 12 25 31.3200 -97.3300 251.000 457.0 158.663 2.330 -999.990 -999.990 1.587 ..P WKT 2011 04 03 12 12 55 31.3200 -97.3300 251.000 457.0 157.354 2.220 -999.990 -999.990 1.574 ..P WKT 2011 04 03 12 13 25 31.3200 -97.3300 251.000 457.0 158.383 2.520 -999.990 -999.990 1.584 ..P WKT 2011 04 03 12 13 55 31.3200 -97.3300 251.000 457.0 160.414 3.430 -999.990 -999.990 1.604 ..P WKT 2011 04 03 12 14 25 31.3200 -97.3300 251.000 457.0 158.436 3.220 -999.990 -999.990 1.584 ..P WKT 2011 04 03 12 14 55 31.3200 -97.3300 251.000 457.0 163.976 4.530 -999.990 -999.990 1.640 ..P WKT 2011 04 03 12 19 55 31.3200 -97.3300 251.000 30.0 163.742 3.260 -999.990 -999.990 1.637 ..P WKT 2011 04 03 12 24 55 31.3200 -97.3300 251.000 122.0 159.497 3.290 -999.990 -999.990 1.595 ..P WKT 2011 04 03 12 29 55 31.3200 -97.3300 251.000 457.0 154.585 2.970 -999.990 -999.990 1.546 ..P WKT 2011 04 03 12 34 55 31.3200 -97.3300 251.000 30.0 151.010 2.640 -999.990 -999.990 1.510 ..P WKT 2011 04 03 12 39 55 31.3200 -97.3300 251.000 122.0 156.622 3.010 -999.990 -999.990 1.566 ..P WKT 2011 04 03 12 44 55 31.3200 -97.3300 251.000 457.0 162.901 3.330 -999.990 -999.990 1.629 ..P WKT 2011 04 03 12 54 55 31.3200 -97.3300 251.000 30.0 156.242 2.640 -999.990 -999.990 1.562 ..P WKT 2011 04 03 12 59 55 31.3200 -97.3300 251.000 122.0 155.163 3.230 -999.990 -999.990 1.552 ..P WKT 2011 04 03 13 04 55 31.3200 -97.3300 251.000 457.0 157.923 3.240 -999.990 -999.990 1.579 ..P WKT 2011 04 03 13 09 55 31.3200 -97.3300 251.000 30.0 157.678 3.050 -999.990 -999.990 1.577 ..P WKT 2011 04 03 13 14 55 31.3200 -97.3300 251.000 122.0 158.435 3.620 -999.990 -999.990 1.584 ..P WKT 2011 04 03 13 19 55 31.3200 -97.3300 251.000 457.0 158.023 3.630 -999.990 -999.990 1.580 ..P WKT 2011 04 03 13 29 55 31.3200 -97.3300 251.000 30.0 152.239 3.830 -999.990 -999.990 1.522 ..P WKT 2011 04 03 13 34 55 31.3200 -97.3300 251.000 122.0 157.551 3.420 -999.990 -999.990 1.576 ..P WKT 2011 04 03 13 39 55 31.3200 -97.3300 251.000 457.0 152.179 2.950 -999.990 -999.990 1.522 ..P WKT 2011 04 03 13 44 55 31.3200 -97.3300 251.000 30.0 152.817 3.600 -999.990 -999.990 1.528 ..P WKT 2011 04 03 13 49 55 31.3200 -97.3300 251.000 122.0 158.628 3.580 -999.990 -999.990 1.586 ..P WKT 2011 04 03 13 54 55 31.3200 -97.3300 251.000 457.0 148.419 4.340 -999.990 -999.990 1.484 ..P WKT 2011 04 03 14 04 55 31.3200 -97.3300 251.000 30.0 152.126 2.440 -999.990 -999.990 1.521 ..P WKT 2011 04 03 14 09 55 31.3200 -97.3300 251.000 122.0 152.357 3.010 -999.990 -999.990 1.524 ..P WKT 2011 04 03 14 14 55 31.3200 -97.3300 251.000 457.0 156.427 4.000 -999.990 -999.990 1.564 ..P WKT 2011 04 03 14 19 55 31.3200 -97.3300 251.000 30.0 151.988 4.050 -999.990 -999.990 1.520 ..P WKT 2011 04 03 14 24 55 31.3200 -97.3300 251.000 122.0 158.892 3.660 -999.990 -999.990 1.589 ..P WKT 2011 04 03 14 29 55 31.3200 -97.3300 251.000 457.0 155.121 2.840 -999.990 -999.990 1.551 ..P WKT 2011 04 03 14 39 55 31.3200 -97.3300 251.000 30.0 157.515 3.800 -999.990 -999.990 1.575 ..P WKT 2011 04 03 14 44 55 31.3200 -97.3300 251.000 122.0 158.675 3.730 -999.990 -999.990 1.587 ..P WKT 2011 04 03 14 49 55 31.3200 -97.3300 251.000 457.0 150.166 4.380 -999.990 -999.990 1.502 ..P WKT 2011 04 03 14 54 55 31.3200 -97.3300 251.000 30.0 148.993 3.490 -999.990 -999.990 1.490 ..P WKT 2011 04 03 14 59 55 31.3200 -97.3300 251.000 122.0 156.488 4.480 -999.990 -999.990 1.565 ..P WKT 2011 04 03 15 04 55 31.3200 -97.3300 251.000 457.0 153.649 3.260 -999.990 -999.990 1.536 ..P WKT 2011 04 03 15 14 55 31.3200 -97.3300 251.000 30.0 159.255 2.660 -999.990 -999.990 1.593 ..P WKT 2011 04 03 15 19 55 31.3200 -97.3300 251.000 122.0 157.701 3.060 -999.990 -999.990 1.577 ..P WKT 2011 04 03 15 24 55 31.3200 -97.3300 251.000 457.0 153.147 3.410 -999.990 -999.990 1.531 ..P WKT 2011 04 03 15 29 55 31.3200 -97.3300 251.000 30.0 153.593 3.100 -999.990 -999.990 1.536 ..P WKT 2011 04 03 15 34 55 31.3200 -97.3300 251.000 122.0 154.706 2.430 -999.990 -999.990 1.547 ..P WKT 2011 04 03 15 39 55 31.3200 -97.3300 251.000 457.0 151.486 2.370 -999.990 -999.990 1.515 ..P WKT 2011 04 03 15 49 55 31.3200 -97.3300 251.000 30.0 152.997 2.150 -999.990 -999.990 1.530 ..P WKT 2011 04 03 15 54 55 31.3200 -97.3300 251.000 122.0 158.726 2.360 -999.990 -999.990 1.587 ..P WKT 2011 04 03 15 59 55 31.3200 -97.3300 251.000 457.0 147.464 3.230 -999.990 -999.990 1.475 ..P WKT 2011 04 03 16 04 55 31.3200 -97.3300 251.000 30.0 156.191 3.710 -999.990 -999.990 1.562 ..P WKT 2011 04 03 16 09 55 31.3200 -97.3300 251.000 122.0 152.592 3.880 -999.990 -999.990 1.526 ..P WKT 2011 04 03 16 14 55 31.3200 -97.3300 251.000 457.0 147.660 3.620 -999.990 -999.990 1.477 ..P WKT 2011 04 03 16 24 55 31.3200 -97.3300 251.000 30.0 154.619 2.680 -999.990 -999.990 1.546 ..P WKT 2011 04 03 16 29 55 31.3200 -97.3300 251.000 122.0 151.520 3.330 -999.990 -999.990 1.515 ..P WKT 2011 04 03 16 34 55 31.3200 -97.3300 251.000 457.0 156.581 5.560 -999.990 -999.990 1.566 ..P WKT 2011 04 03 16 39 55 31.3200 -97.3300 251.000 30.0 154.482 5.340 -999.990 -999.990 1.545 ..P WKT 2011 04 03 16 44 55 31.3200 -97.3300 251.000 122.0 158.376 4.700 -999.990 -999.990 1.584 ..P WKT 2011 04 03 16 49 55 31.3200 -97.3300 251.000 457.0 164.600 3.480 -999.990 -999.990 1.646 ..P WKT 2011 04 03 17 04 55 31.3200 -97.3300 251.000 30.0 164.602 4.400 -999.990 -999.990 1.646 ..P WKT 2011 04 03 17 09 55 31.3200 -97.3300 251.000 122.0 168.150 5.190 -999.990 -999.990 1.681 ..P WKT 2011 04 03 17 14 55 31.3200 -97.3300 251.000 457.0 164.374 6.100 -999.990 -999.990 1.644 ..P WKT 2011 04 03 17 19 55 31.3200 -97.3300 251.000 30.0 155.275 3.740 -999.990 -999.990 1.553 ..P WKT 2011 04 03 17 24 55 31.3200 -97.3300 251.000 122.0 158.490 3.460 -999.990 -999.990 1.585 ..P WKT 2011 04 03 17 29 55 31.3200 -97.3300 251.000 457.0 157.544 3.400 -999.990 -999.990 1.575 ..P WKT 2011 04 03 17 39 55 31.3200 -97.3300 251.000 30.0 156.949 3.370 -999.990 -999.990 1.569 ..P WKT 2011 04 03 17 44 55 31.3200 -97.3300 251.000 122.0 153.973 4.080 -999.990 -999.990 1.540 ..P WKT 2011 04 03 17 49 55 31.3200 -97.3300 251.000 457.0 153.491 4.450 -999.990 -999.990 1.535 ..P WKT 2011 04 03 17 54 55 31.3200 -97.3300 251.000 30.0 149.352 6.310 -999.990 -999.990 1.494 ..P WKT 2011 04 03 17 59 55 31.3200 -97.3300 251.000 122.0 154.524 4.980 -999.990 -999.990 1.545 ..P WKT 2011 04 03 18 04 55 31.3200 -97.3300 251.000 457.0 153.711 3.700 -999.990 -999.990 1.537 ..P WKT 2011 04 03 18 14 55 31.3200 -97.3300 251.000 30.0 157.451 3.730 -999.990 -999.990 1.575 ..P WKT 2011 04 03 18 19 55 31.3200 -97.3300 251.000 122.0 163.169 4.740 -999.990 -999.990 1.632 ..P WKT 2011 04 03 18 24 55 31.3200 -97.3300 251.000 457.0 159.909 5.860 -999.990 -999.990 1.599 ..P WKT 2011 04 03 18 29 55 31.3200 -97.3300 251.000 30.0 152.992 4.720 -999.990 -999.990 1.530 ..P WKT 2011 04 03 18 34 55 31.3200 -97.3300 251.000 122.0 165.357 3.840 -999.990 -999.990 1.654 ..P WKT 2011 04 03 18 39 55 31.3200 -97.3300 251.000 457.0 161.765 3.980 -999.990 -999.990 1.618 ..P WKT 2011 04 03 18 49 55 31.3200 -97.3300 251.000 30.0 161.894 4.280 -999.990 -999.990 1.619 ..P WKT 2011 04 03 18 54 55 31.3200 -97.3300 251.000 122.0 168.937 4.110 -999.990 -999.990 1.689 ..P WKT 2011 04 03 18 59 55 31.3200 -97.3300 251.000 457.0 162.355 4.090 -999.990 -999.990 1.624 ..P WKT 2011 04 03 19 04 55 31.3200 -97.3300 251.000 30.0 156.438 3.990 -999.990 -999.990 1.564 ..P WKT 2011 04 03 19 09 55 31.3200 -97.3300 251.000 122.0 164.810 3.460 -999.990 -999.990 1.648 ..P WKT 2011 04 03 19 14 55 31.3200 -97.3300 251.000 457.0 163.877 3.180 -999.990 -999.990 1.639 ..P WKT 2011 04 03 19 24 55 31.3200 -97.3300 251.000 30.0 153.896 4.380 -999.990 -999.990 1.539 ..P WKT 2011 04 03 19 29 55 31.3200 -97.3300 251.000 122.0 158.470 3.640 -999.990 -999.990 1.585 ..P WKT 2011 04 03 19 34 55 31.3200 -97.3300 251.000 457.0 157.728 3.200 -999.990 -999.990 1.577 ..P WKT 2011 04 03 19 39 55 31.3200 -97.3300 251.000 30.0 152.668 3.190 -999.990 -999.990 1.527 ..P WKT 2011 04 03 19 44 55 31.3200 -97.3300 251.000 122.0 156.576 3.230 -999.990 -999.990 1.566 ..P WKT 2011 04 03 19 49 55 31.3200 -97.3300 251.000 457.0 157.828 3.250 -999.990 -999.990 1.578 ..P WKT 2011 04 03 19 59 55 31.3200 -97.3300 251.000 30.0 156.296 3.120 -999.990 -999.990 1.563 ..P WKT 2011 04 03 20 04 55 31.3200 -97.3300 251.000 122.0 162.147 3.410 -999.990 -999.990 1.621 ..P WKT 2011 04 03 20 09 55 31.3200 -97.3300 251.000 457.0 157.873 3.300 -999.990 -999.990 1.579 ..P WKT 2011 04 03 20 14 55 31.3200 -97.3300 251.000 30.0 167.209 3.010 -999.990 -999.990 1.672 ..P WKT 2011 04 03 20 19 55 31.3200 -97.3300 251.000 122.0 161.108 3.740 -999.990 -999.990 1.611 ..P WKT 2011 04 03 20 24 55 31.3200 -97.3300 251.000 457.0 162.974 3.900 -999.990 -999.990 1.630 ..P WKT 2011 04 03 20 34 55 31.3200 -97.3300 251.000 30.0 155.943 3.180 -999.990 -999.990 1.559 ..P WKT 2011 04 03 20 39 55 31.3200 -97.3300 251.000 122.0 159.161 3.920 -999.990 -999.990 1.592 ..P WKT 2011 04 03 20 44 55 31.3200 -97.3300 251.000 457.0 155.907 3.210 -999.990 -999.990 1.559 ..P WKT 2011 04 03 20 49 55 31.3200 -97.3300 251.000 30.0 154.478 4.520 -999.990 -999.990 1.545 ..P WKT 2011 04 03 20 54 55 31.3200 -97.3300 251.000 122.0 161.843 3.280 -999.990 -999.990 1.618 ..P WKT 2011 04 03 20 59 55 31.3200 -97.3300 251.000 457.0 154.940 3.270 -999.990 -999.990 1.549 ..P WKT 2011 04 03 21 09 55 31.3200 -97.3300 251.000 30.0 158.340 5.140 -999.990 -999.990 1.583 ..P WKT 2011 04 03 21 14 55 31.3200 -97.3300 251.000 122.0 158.854 3.460 -999.990 -999.990 1.589 ..P WKT 2011 04 03 21 19 55 31.3200 -97.3300 251.000 457.0 160.530 3.980 -999.990 -999.990 1.605 ..P WKT 2011 04 03 21 24 55 31.3200 -97.3300 251.000 30.0 157.562 3.150 -999.990 -999.990 1.576 ..P WKT 2011 04 03 21 29 55 31.3200 -97.3300 251.000 122.0 156.750 3.210 -999.990 -999.990 1.568 ..P WKT 2011 04 03 21 34 55 31.3200 -97.3300 251.000 457.0 153.285 3.400 -999.990 -999.990 1.533 ..P WKT 2011 04 03 21 44 55 31.3200 -97.3300 251.000 30.0 156.116 4.540 -999.990 -999.990 1.561 ..P WKT 2011 04 03 21 49 55 31.3200 -97.3300 251.000 122.0 158.098 3.600 -999.990 -999.990 1.581 ..P WKT 2011 04 03 21 54 55 31.3200 -97.3300 251.000 457.0 156.434 4.090 -999.990 -999.990 1.564 ..P WKT 2011 04 03 21 59 55 31.3200 -97.3300 251.000 30.0 163.057 4.410 -999.990 -999.990 1.631 ..P WKT 2011 04 03 22 04 55 31.3200 -97.3300 251.000 122.0 162.387 4.310 -999.990 -999.990 1.624 ..P WKT 2011 04 03 22 09 55 31.3200 -97.3300 251.000 457.0 157.574 4.340 -999.990 -999.990 1.576 ..P WKT 2011 04 03 22 19 55 31.3200 -97.3300 251.000 30.0 159.195 4.240 -999.990 -999.990 1.592 ..P WKT 2011 04 03 22 24 55 31.3200 -97.3300 251.000 122.0 159.164 4.050 -999.990 -999.990 1.592 ..P WKT 2011 04 03 22 29 55 31.3200 -97.3300 251.000 457.0 157.809 4.830 -999.990 -999.990 1.578 ..P WKT 2011 04 03 22 34 55 31.3200 -97.3300 251.000 30.0 156.785 3.760 -999.990 -999.990 1.568 ..P WKT 2011 04 03 22 39 55 31.3200 -97.3300 251.000 122.0 160.400 4.820 -999.990 -999.990 1.604 ..P WKT 2011 04 03 22 44 55 31.3200 -97.3300 251.000 457.0 149.768 3.730 -999.990 -999.990 1.498 ..P WKT 2011 04 03 22 54 55 31.3200 -97.3300 251.000 30.0 157.138 3.930 -999.990 -999.990 1.571 ..P WKT 2011 04 03 22 59 55 31.3200 -97.3300 251.000 122.0 158.906 4.940 -999.990 -999.990 1.589 ..P WKT 2011 04 03 23 04 55 31.3200 -97.3300 251.000 457.0 163.655 3.930 -999.990 -999.990 1.637 ..P WKT 2011 04 03 23 09 55 31.3200 -97.3300 251.000 30.0 158.467 3.750 -999.990 -999.990 1.585 ..P WKT 2011 04 03 23 14 55 31.3200 -97.3300 251.000 122.0 159.573 3.760 -999.990 -999.990 1.596 ..P WKT 2011 04 03 23 19 55 31.3200 -97.3300 251.000 457.0 157.697 3.590 -999.990 -999.990 1.577 ..P WKT 2011 04 03 23 29 55 31.3200 -97.3300 251.000 30.0 151.034 3.570 -999.990 -999.990 1.510 ..P WKT 2011 04 03 23 34 55 31.3200 -97.3300 251.000 122.0 156.177 3.720 -999.990 -999.990 1.562 ..P WKT 2011 04 03 23 39 55 31.3200 -97.3300 251.000 457.0 151.719 4.430 -999.990 -999.990 1.517 ..P WKT 2011 04 03 23 44 55 31.3200 -97.3300 251.000 30.0 146.270 3.920 -999.990 -999.990 1.463 ..P WKT 2011 04 03 23 49 55 31.3200 -97.3300 251.000 122.0 153.729 5.220 -999.990 -999.990 1.537 ..P WKT 2011 04 04 00 09 55 31.3200 -97.3300 251.000 457.0 159.084 4.850 -999.990 -999.990 1.591 ..P WKT 2011 04 04 00 10 25 31.3200 -97.3300 251.000 457.0 165.216 5.190 -999.990 -999.990 1.652 ..P WKT 2011 04 04 00 10 55 31.3200 -97.3300 251.000 457.0 163.903 4.940 -999.990 -999.990 1.639 ..P WKT 2011 04 04 00 11 25 31.3200 -97.3300 251.000 457.0 166.065 5.020 -999.990 -999.990 1.661 ..P WKT 2011 04 04 00 11 55 31.3200 -97.3300 251.000 457.0 162.436 5.120 -999.990 -999.990 1.624 ..P WKT 2011 04 04 00 12 25 31.3200 -97.3300 251.000 457.0 165.591 5.150 -999.990 -999.990 1.656 ..P WKT 2011 04 04 00 12 55 31.3200 -97.3300 251.000 457.0 162.954 5.250 -999.990 -999.990 1.630 ..P WKT 2011 04 04 00 13 25 31.3200 -97.3300 251.000 457.0 165.943 5.140 -999.990 -999.990 1.659 ..P WKT 2011 04 04 00 13 55 31.3200 -97.3300 251.000 457.0 165.458 5.250 -999.990 -999.990 1.655 ..P WKT 2011 04 04 00 14 25 31.3200 -97.3300 251.000 457.0 163.814 6.910 -999.990 -999.990 1.638 ..P WKT 2011 04 04 00 14 55 31.3200 -97.3300 251.000 457.0 162.006 6.130 -999.990 -999.990 1.620 ..P WKT 2011 04 04 00 19 55 31.3200 -97.3300 251.000 30.0 161.453 4.900 -999.990 -999.990 1.615 ..P WKT 2011 04 04 00 24 55 31.3200 -97.3300 251.000 122.0 166.360 5.080 -999.990 -999.990 1.664 ..P WKT 2011 04 04 00 29 55 31.3200 -97.3300 251.000 457.0 163.492 5.590 -999.990 -999.990 1.635 ..P WKT 2011 04 04 00 34 55 31.3200 -97.3300 251.000 30.0 159.300 5.370 -999.990 -999.990 1.593 ..P WKT 2011 04 04 00 39 55 31.3200 -97.3300 251.000 122.0 162.387 5.100 -999.990 -999.990 1.624 ..P WKT 2011 04 04 00 44 55 31.3200 -97.3300 251.000 457.0 164.481 5.450 -999.990 -999.990 1.645 ..P WKT 2011 04 04 00 54 55 31.3200 -97.3300 251.000 30.0 159.599 5.290 -999.990 -999.990 1.596 ..P WKT 2011 04 04 00 59 55 31.3200 -97.3300 251.000 122.0 159.403 5.600 -999.990 -999.990 1.594 ..P WKT 2011 04 04 01 04 55 31.3200 -97.3300 251.000 457.0 158.878 4.910 -999.990 -999.990 1.589 ..P WKT 2011 04 04 01 09 55 31.3200 -97.3300 251.000 30.0 159.840 4.690 -999.990 -999.990 1.598 ..P WKT 2011 04 04 01 14 55 31.3200 -97.3300 251.000 122.0 157.495 4.710 -999.990 -999.990 1.575 ..P WKT 2011 04 04 01 19 55 31.3200 -97.3300 251.000 457.0 154.158 4.750 -999.990 -999.990 1.542 ..P WKT 2011 04 04 01 29 55 31.3200 -97.3300 251.000 30.0 155.563 4.600 -999.990 -999.990 1.556 ..P WKT 2011 04 04 01 34 55 31.3200 -97.3300 251.000 122.0 160.470 4.050 -999.990 -999.990 1.605 ..P WKT 2011 04 04 01 39 55 31.3200 -97.3300 251.000 457.0 150.992 4.530 -999.990 -999.990 1.510 ..P WKT 2011 04 04 01 44 55 31.3200 -97.3300 251.000 30.0 156.725 4.300 -999.990 -999.990 1.567 ..P WKT 2011 04 04 01 49 55 31.3200 -97.3300 251.000 122.0 157.664 4.130 -999.990 -999.990 1.577 ..P WKT 2011 04 04 01 54 55 31.3200 -97.3300 251.000 457.0 151.494 4.260 -999.990 -999.990 1.515 ..P WKT 2011 04 04 02 04 55 31.3200 -97.3300 251.000 30.0 155.757 5.560 -999.990 -999.990 1.558 ..P WKT 2011 04 04 02 09 55 31.3200 -97.3300 251.000 122.0 159.576 4.290 -999.990 -999.990 1.596 ..P WKT 2011 04 04 02 14 55 31.3200 -97.3300 251.000 457.0 152.816 3.880 -999.990 -999.990 1.528 ..P WKT 2011 04 04 02 19 55 31.3200 -97.3300 251.000 30.0 158.289 4.050 -999.990 -999.990 1.583 ..P WKT 2011 04 04 02 24 55 31.3200 -97.3300 251.000 122.0 157.149 4.150 -999.990 -999.990 1.571 ..P WKT 2011 04 04 02 29 55 31.3200 -97.3300 251.000 457.0 157.662 5.520 -999.990 -999.990 1.577 ..P WKT 2011 04 04 02 39 55 31.3200 -97.3300 251.000 30.0 156.304 4.280 -999.990 -999.990 1.563 ..P WKT 2011 04 04 02 44 55 31.3200 -97.3300 251.000 122.0 156.417 4.850 -999.990 -999.990 1.564 ..P WKT 2011 04 04 02 49 55 31.3200 -97.3300 251.000 457.0 159.172 4.530 -999.990 -999.990 1.592 ..P WKT 2011 04 04 02 54 55 31.3200 -97.3300 251.000 30.0 148.708 4.540 -999.990 -999.990 1.487 ..P WKT 2011 04 04 02 59 55 31.3200 -97.3300 251.000 122.0 158.404 3.880 -999.990 -999.990 1.584 ..P WKT 2011 04 04 03 04 55 31.3200 -97.3300 251.000 457.0 151.576 4.370 -999.990 -999.990 1.516 ..P WKT 2011 04 04 03 14 55 31.3200 -97.3300 251.000 30.0 160.345 3.540 -999.990 -999.990 1.603 ..P WKT 2011 04 04 03 19 55 31.3200 -97.3300 251.000 122.0 157.766 3.940 -999.990 -999.990 1.578 ..P WKT 2011 04 04 03 24 55 31.3200 -97.3300 251.000 457.0 147.257 3.250 -999.990 -999.990 1.473 ..P WKT 2011 04 04 03 29 55 31.3200 -97.3300 251.000 30.0 152.609 4.670 -999.990 -999.990 1.526 ..P WKT 2011 04 04 03 34 55 31.3200 -97.3300 251.000 122.0 155.317 3.110 -999.990 -999.990 1.553 ..P WKT 2011 04 04 03 39 55 31.3200 -97.3300 251.000 457.0 152.738 3.100 -999.990 -999.990 1.527 ..P WKT 2011 04 04 03 49 55 31.3200 -97.3300 251.000 30.0 156.479 2.960 -999.990 -999.990 1.565 ..P WKT 2011 04 04 03 54 55 31.3200 -97.3300 251.000 122.0 155.198 3.630 -999.990 -999.990 1.552 ..P WKT 2011 04 04 03 59 55 31.3200 -97.3300 251.000 457.0 151.440 3.400 -999.990 -999.990 1.514 ..P WKT 2011 04 04 04 04 55 31.3200 -97.3300 251.000 30.0 153.133 5.000 -999.990 -999.990 1.531 ..P WKT 2011 04 04 04 09 55 31.3200 -97.3300 251.000 122.0 158.460 3.460 -999.990 -999.990 1.585 ..P WKT 2011 04 04 04 14 55 31.3200 -97.3300 251.000 457.0 152.720 3.600 -999.990 -999.990 1.527 ..P WKT 2011 04 04 04 24 55 31.3200 -97.3300 251.000 30.0 148.013 4.150 -999.990 -999.990 1.480 ..P WKT 2011 04 04 04 29 55 31.3200 -97.3300 251.000 122.0 160.441 3.520 -999.990 -999.990 1.604 ..P WKT 2011 04 04 04 34 55 31.3200 -97.3300 251.000 457.0 156.353 3.430 -999.990 -999.990 1.564 ..P WKT 2011 04 04 04 39 55 31.3200 -97.3300 251.000 30.0 150.779 3.610 -999.990 -999.990 1.508 ..P WKT 2011 04 04 04 44 55 31.3200 -97.3300 251.000 122.0 153.958 4.530 -999.990 -999.990 1.540 ..P WKT 2011 04 04 04 49 55 31.3200 -97.3300 251.000 457.0 157.467 3.800 -999.990 -999.990 1.575 ..P WKT 2011 04 04 05 04 55 31.3200 -97.3300 251.000 30.0 158.286 4.030 -999.990 -999.990 1.583 ..P WKT 2011 04 04 05 09 55 31.3200 -97.3300 251.000 122.0 153.392 3.170 -999.990 -999.990 1.534 ..P WKT 2011 04 04 05 14 55 31.3200 -97.3300 251.000 457.0 161.871 2.870 -999.990 -999.990 1.619 ..P WKT 2011 04 04 05 19 55 31.3200 -97.3300 251.000 30.0 151.858 2.790 -999.990 -999.990 1.519 ..P WKT 2011 04 04 05 24 55 31.3200 -97.3300 251.000 122.0 157.035 3.390 -999.990 -999.990 1.570 ..P WKT 2011 04 04 05 29 55 31.3200 -97.3300 251.000 457.0 156.268 2.540 -999.990 -999.990 1.563 ..P WKT 2011 04 04 05 39 55 31.3200 -97.3300 251.000 30.0 155.118 2.460 -999.990 -999.990 1.551 ..P WKT 2011 04 04 05 44 55 31.3200 -97.3300 251.000 122.0 153.744 3.260 -999.990 -999.990 1.537 ..P WKT 2011 04 04 05 49 55 31.3200 -97.3300 251.000 457.0 155.837 3.250 -999.990 -999.990 1.558 ..P WKT 2011 04 04 05 54 55 31.3200 -97.3300 251.000 30.0 151.163 3.040 -999.990 -999.990 1.512 ..P WKT 2011 04 04 05 59 55 31.3200 -97.3300 251.000 122.0 153.420 2.650 -999.990 -999.990 1.534 ..P WKT 2011 04 04 06 04 55 31.3200 -97.3300 251.000 457.0 156.338 2.920 -999.990 -999.990 1.563 ..P WKT 2011 04 04 06 14 55 31.3200 -97.3300 251.000 30.0 153.426 3.780 -999.990 -999.990 1.534 ..P WKT 2011 04 04 06 19 55 31.3200 -97.3300 251.000 122.0 154.198 3.560 -999.990 -999.990 1.542 ..P WKT 2011 04 04 06 24 55 31.3200 -97.3300 251.000 457.0 155.300 3.930 -999.990 -999.990 1.553 ..P WKT 2011 04 04 06 29 55 31.3200 -97.3300 251.000 30.0 151.451 2.620 -999.990 -999.990 1.515 ..P WKT 2011 04 04 06 34 55 31.3200 -97.3300 251.000 122.0 156.843 2.270 -999.990 -999.990 1.568 ..P WKT 2011 04 04 06 39 55 31.3200 -97.3300 251.000 457.0 154.645 3.140 -999.990 -999.990 1.546 ..P WKT 2011 04 04 06 49 55 31.3200 -97.3300 251.000 30.0 156.801 2.240 -999.990 -999.990 1.568 ..P WKT 2011 04 04 06 54 55 31.3200 -97.3300 251.000 122.0 158.516 2.220 -999.990 -999.990 1.585 ..P WKT 2011 04 04 06 59 55 31.3200 -97.3300 251.000 457.0 161.220 2.930 -999.990 -999.990 1.612 ..P WKT 2011 04 04 07 04 55 31.3200 -97.3300 251.000 30.0 154.025 2.410 -999.990 -999.990 1.540 ..P WKT 2011 04 04 07 09 55 31.3200 -97.3300 251.000 122.0 165.967 3.200 -999.990 -999.990 1.660 ..P WKT 2011 04 04 07 14 55 31.3200 -97.3300 251.000 457.0 163.722 3.910 -999.990 -999.990 1.637 ..P WKT 2011 04 04 07 24 55 31.3200 -97.3300 251.000 30.0 162.272 3.670 -999.990 -999.990 1.623 ..P WKT 2011 04 04 07 29 55 31.3200 -97.3300 251.000 122.0 159.108 2.740 -999.990 -999.990 1.591 ..P WKT 2011 04 04 07 34 55 31.3200 -97.3300 251.000 457.0 156.274 2.700 -999.990 -999.990 1.563 ..P WKT 2011 04 04 07 39 55 31.3200 -97.3300 251.000 30.0 156.740 3.680 -999.990 -999.990 1.567 ..P WKT 2011 04 04 07 44 55 31.3200 -97.3300 251.000 122.0 164.131 3.190 -999.990 -999.990 1.641 ..P WKT 2011 04 04 07 49 55 31.3200 -97.3300 251.000 457.0 157.670 3.740 -999.990 -999.990 1.577 ..P WKT 2011 04 04 07 59 55 31.3200 -97.3300 251.000 30.0 158.717 3.950 -999.990 -999.990 1.587 ..P WKT 2011 04 04 08 04 55 31.3200 -97.3300 251.000 122.0 164.247 3.500 -999.990 -999.990 1.642 ..P WKT 2011 04 04 08 09 55 31.3200 -97.3300 251.000 457.0 165.325 3.740 -999.990 -999.990 1.653 ..P WKT 2011 04 04 08 14 55 31.3200 -97.3300 251.000 30.0 156.673 3.530 -999.990 -999.990 1.567 ..P WKT 2011 04 04 08 19 55 31.3200 -97.3300 251.000 122.0 158.741 3.440 -999.990 -999.990 1.587 ..P WKT 2011 04 04 08 24 55 31.3200 -97.3300 251.000 457.0 162.950 3.790 -999.990 -999.990 1.629 ..P WKT 2011 04 04 08 34 55 31.3200 -97.3300 251.000 30.0 157.803 3.010 -999.990 -999.990 1.578 ..P WKT 2011 04 04 08 39 55 31.3200 -97.3300 251.000 122.0 160.152 3.090 -999.990 -999.990 1.602 ..P WKT 2011 04 04 08 44 55 31.3200 -97.3300 251.000 457.0 168.270 4.380 -999.990 -999.990 1.683 ..P WKT 2011 04 04 08 49 55 31.3200 -97.3300 251.000 30.0 159.245 2.780 -999.990 -999.990 1.592 ..P WKT 2011 04 04 08 54 55 31.3200 -97.3300 251.000 122.0 162.747 2.670 -999.990 -999.990 1.627 ..P WKT 2011 04 04 08 59 55 31.3200 -97.3300 251.000 457.0 161.633 3.170 -999.990 -999.990 1.616 ..P WKT 2011 04 04 09 09 55 31.3200 -97.3300 251.000 30.0 163.505 2.950 -999.990 -999.990 1.635 ..P WKT 2011 04 04 09 14 55 31.3200 -97.3300 251.000 122.0 166.983 2.700 -999.990 -999.990 1.670 ..P WKT 2011 04 04 09 19 55 31.3200 -97.3300 251.000 457.0 166.505 2.740 -999.990 -999.990 1.665 ..P WKT 2011 04 04 09 24 55 31.3200 -97.3300 251.000 30.0 163.226 2.950 -999.990 -999.990 1.632 ..P WKT 2011 04 04 09 29 55 31.3200 -97.3300 251.000 122.0 164.562 3.020 -999.990 -999.990 1.646 ..P WKT 2011 04 04 09 34 55 31.3200 -97.3300 251.000 457.0 165.073 3.890 -999.990 -999.990 1.651 ..P WKT 2011 04 04 09 44 55 31.3200 -97.3300 251.000 30.0 161.153 4.100 -999.990 -999.990 1.612 ..P WKT 2011 04 04 09 49 55 31.3200 -97.3300 251.000 122.0 166.607 3.480 -999.990 -999.990 1.666 ..P WKT 2011 04 04 09 54 55 31.3200 -97.3300 251.000 457.0 159.046 3.600 -999.990 -999.990 1.590 ..P WKT 2011 04 04 09 59 55 31.3200 -97.3300 251.000 30.0 163.017 4.310 -999.990 -999.990 1.630 ..P WKT 2011 04 04 10 04 55 31.3200 -97.3300 251.000 122.0 161.716 3.180 -999.990 -999.990 1.617 ..P WKT 2011 04 04 10 09 55 31.3200 -97.3300 251.000 457.0 173.265 4.220 -999.990 -999.990 1.733 ..P WKT 2011 04 04 10 19 55 31.3200 -97.3300 251.000 30.0 167.933 4.870 -999.990 -999.990 1.679 ..P WKT 2011 04 04 10 24 55 31.3200 -97.3300 251.000 122.0 165.221 2.860 -999.990 -999.990 1.652 ..P WKT 2011 04 04 10 29 55 31.3200 -97.3300 251.000 457.0 173.050 3.170 -999.990 -999.990 1.731 ..P WKT 2011 04 04 10 34 55 31.3200 -97.3300 251.000 30.0 167.043 3.580 -999.990 -999.990 1.670 ..P WKT 2011 04 04 10 39 55 31.3200 -97.3300 251.000 122.0 167.624 4.580 -999.990 -999.990 1.676 ..P WKT 2011 04 04 10 44 55 31.3200 -97.3300 251.000 457.0 171.171 3.190 -999.990 -999.990 1.712 ..P WKT 2011 04 04 10 54 55 31.3200 -97.3300 251.000 30.0 164.947 3.200 -999.990 -999.990 1.649 ..P WKT 2011 04 04 10 59 55 31.3200 -97.3300 251.000 122.0 173.621 3.740 -999.990 -999.990 1.736 ..P WKT 2011 04 04 11 04 55 31.3200 -97.3300 251.000 457.0 167.803 3.770 -999.990 -999.990 1.678 ..P WKT 2011 04 04 11 09 55 31.3200 -97.3300 251.000 30.0 167.256 3.350 -999.990 -999.990 1.673 ..P WKT 2011 04 04 11 14 55 31.3200 -97.3300 251.000 122.0 170.660 3.040 -999.990 -999.990 1.707 ..P WKT 2011 04 04 11 19 55 31.3200 -97.3300 251.000 457.0 172.747 2.510 -999.990 -999.990 1.727 ..P WKT 2011 04 04 11 29 55 31.3200 -97.3300 251.000 30.0 166.865 2.210 -999.990 -999.990 1.669 ..P WKT 2011 04 04 11 34 55 31.3200 -97.3300 251.000 122.0 164.495 3.300 -999.990 -999.990 1.645 ..P WKT 2011 04 04 11 39 55 31.3200 -97.3300 251.000 457.0 169.039 2.550 -999.990 -999.990 1.690 ..P WKT 2011 04 04 11 44 55 31.3200 -97.3300 251.000 30.0 165.023 4.450 -999.990 -999.990 1.650 ..P WKT 2011 04 04 11 49 55 31.3200 -97.3300 251.000 122.0 162.323 3.440 -999.990 -999.990 1.623 ..P WKT 2011 04 04 12 09 55 31.3200 -97.3300 251.000 457.0 163.299 3.140 -999.990 -999.990 1.633 ..P WKT 2011 04 04 12 10 25 31.3200 -97.3300 251.000 457.0 159.586 2.820 -999.990 -999.990 1.596 ..P WKT 2011 04 04 12 10 55 31.3200 -97.3300 251.000 457.0 165.258 3.540 -999.990 -999.990 1.653 ..P WKT 2011 04 04 12 11 25 31.3200 -97.3300 251.000 457.0 165.167 2.640 -999.990 -999.990 1.652 ..P WKT 2011 04 04 12 11 55 31.3200 -97.3300 251.000 457.0 166.394 2.450 -999.990 -999.990 1.664 ..P WKT 2011 04 04 12 12 25 31.3200 -97.3300 251.000 457.0 164.492 2.970 -999.990 -999.990 1.645 ..P WKT 2011 04 04 12 12 55 31.3200 -97.3300 251.000 457.0 162.919 2.630 -999.990 -999.990 1.629 ..P WKT 2011 04 04 12 13 25 31.3200 -97.3300 251.000 457.0 166.451 3.440 -999.990 -999.990 1.665 ..P WKT 2011 04 04 12 13 55 31.3200 -97.3300 251.000 457.0 171.135 3.440 -999.990 -999.990 1.711 ..P WKT 2011 04 04 12 14 25 31.3200 -97.3300 251.000 457.0 165.117 3.250 -999.990 -999.990 1.651 ..P WKT 2011 04 04 12 14 55 31.3200 -97.3300 251.000 457.0 166.672 2.850 -999.990 -999.990 1.667 ..P WKT 2011 04 04 12 19 55 31.3200 -97.3300 251.000 30.0 160.661 3.670 -999.990 -999.990 1.607 ..P WKT 2011 04 04 12 24 55 31.3200 -97.3300 251.000 122.0 135.710 2.890 -999.990 -999.990 1.357 ..P WKT 2011 04 04 12 29 55 31.3200 -97.3300 251.000 457.0 140.069 3.240 -999.990 -999.990 1.401 ..P WKT 2011 04 04 12 34 55 31.3200 -97.3300 251.000 30.0 133.725 2.560 -999.990 -999.990 1.337 ..P WKT 2011 04 04 12 39 55 31.3200 -97.3300 251.000 122.0 133.638 2.640 -999.990 -999.990 1.336 ..P WKT 2011 04 04 12 44 55 31.3200 -97.3300 251.000 457.0 134.211 1.910 -999.990 -999.990 1.342 ..P WKT 2011 04 04 12 54 55 31.3200 -97.3300 251.000 30.0 140.276 2.670 -999.990 -999.990 1.403 ..P WKT 2011 04 04 12 59 55 31.3200 -97.3300 251.000 122.0 135.391 3.210 -999.990 -999.990 1.354 ..P WKT 2011 04 04 13 04 55 31.3200 -97.3300 251.000 457.0 143.192 3.390 -999.990 -999.990 1.432 ..P WKT 2011 04 04 13 09 55 31.3200 -97.3300 251.000 30.0 142.097 2.470 -999.990 -999.990 1.421 ..P WKT 2011 04 04 13 14 55 31.3200 -97.3300 251.000 122.0 138.035 2.590 -999.990 -999.990 1.380 ..P WKT 2011 04 04 13 19 55 31.3200 -97.3300 251.000 457.0 136.279 2.080 -999.990 -999.990 1.363 ..P WKT 2011 04 04 13 29 55 31.3200 -97.3300 251.000 30.0 138.348 1.780 -999.990 -999.990 1.383 ..P WKT 2011 04 04 13 34 55 31.3200 -97.3300 251.000 122.0 140.030 3.900 -999.990 -999.990 1.400 ..P WKT 2011 04 04 13 39 55 31.3200 -97.3300 251.000 457.0 135.613 2.500 -999.990 -999.990 1.356 ..P WKT 2011 04 04 13 44 55 31.3200 -97.3300 251.000 30.0 134.987 2.650 -999.990 -999.990 1.350 ..P WKT 2011 04 04 13 49 55 31.3200 -97.3300 251.000 122.0 139.308 2.460 -999.990 -999.990 1.393 ..P WKT 2011 04 04 13 54 55 31.3200 -97.3300 251.000 457.0 139.672 2.160 -999.990 -999.990 1.397 ..P WKT 2011 04 04 14 04 55 31.3200 -97.3300 251.000 30.0 138.467 2.280 -999.990 -999.990 1.385 ..P WKT 2011 04 04 14 09 55 31.3200 -97.3300 251.000 122.0 138.548 4.370 -999.990 -999.990 1.385 ..P WKT 2011 04 04 14 14 55 31.3200 -97.3300 251.000 457.0 138.630 2.670 -999.990 -999.990 1.386 ..P WKT 2011 04 04 14 19 55 31.3200 -97.3300 251.000 30.0 137.061 4.390 -999.990 -999.990 1.371 ..P WKT 2011 04 04 14 24 55 31.3200 -97.3300 251.000 122.0 137.472 2.340 -999.990 -999.990 1.375 ..P WKT 2011 04 04 14 29 55 31.3200 -97.3300 251.000 457.0 131.284 2.200 -999.990 -999.990 1.313 ..P WKT 2011 04 04 14 39 55 31.3200 -97.3300 251.000 30.0 131.586 2.240 -999.990 -999.990 1.316 ..P WKT 2011 04 04 14 44 55 31.3200 -97.3300 251.000 122.0 136.098 2.530 -999.990 -999.990 1.361 ..P WKT 2011 04 04 14 49 55 31.3200 -97.3300 251.000 457.0 131.370 3.050 -999.990 -999.990 1.314 ..P WKT 2011 04 04 14 54 55 31.3200 -97.3300 251.000 30.0 131.262 4.150 -999.990 -999.990 1.313 ..P WKT 2011 04 04 14 59 55 31.3200 -97.3300 251.000 122.0 131.154 2.840 -999.990 -999.990 1.312 ..P WKT 2011 04 04 15 04 55 31.3200 -97.3300 251.000 457.0 133.687 2.870 -999.990 -999.990 1.337 ..P WKT 2011 04 04 15 14 55 31.3200 -97.3300 251.000 30.0 138.117 3.700 -999.990 -999.990 1.381 ..P WKT 2011 04 04 15 19 55 31.3200 -97.3300 251.000 122.0 138.363 3.500 -999.990 -999.990 1.384 ..P WKT 2011 04 04 15 24 55 31.3200 -97.3300 251.000 457.0 143.563 4.390 -999.990 -999.990 1.436 ..P WKT 2011 04 04 15 29 55 31.3200 -97.3300 251.000 30.0 142.819 5.460 -999.990 -999.990 1.428 ..P WKT 2011 04 04 15 34 55 31.3200 -97.3300 251.000 122.0 142.406 3.970 -999.990 -999.990 1.424 ..P WKT 2011 04 04 15 39 55 31.3200 -97.3300 251.000 457.0 140.835 3.370 -999.990 -999.990 1.408 ..P WKT 2011 04 04 15 49 55 31.3200 -97.3300 251.000 30.0 144.184 3.560 -999.990 -999.990 1.442 ..P WKT 2011 04 04 15 54 55 31.3200 -97.3300 251.000 122.0 149.434 3.970 -999.990 -999.990 1.494 ..P WKT 2011 04 04 15 59 55 31.3200 -97.3300 251.000 457.0 142.790 4.930 -999.990 -999.990 1.428 ..P WKT 2011 04 04 16 04 55 31.3200 -97.3300 251.000 30.0 145.231 4.590 -999.990 -999.990 1.452 ..P WKT 2011 04 04 16 09 55 31.3200 -97.3300 251.000 122.0 143.542 3.490 -999.990 -999.990 1.435 ..P WKT 2011 04 04 16 14 55 31.3200 -97.3300 251.000 457.0 142.184 2.180 -999.990 -999.990 1.422 ..P WKT 2011 04 04 16 24 55 31.3200 -97.3300 251.000 30.0 137.058 2.970 -999.990 -999.990 1.371 ..P WKT 2011 04 04 16 29 55 31.3200 -97.3300 251.000 122.0 139.407 3.380 -999.990 -999.990 1.394 ..P WKT 2011 04 04 16 34 55 31.3200 -97.3300 251.000 457.0 141.754 3.140 -999.990 -999.990 1.418 ..P WKT 2011 04 04 16 39 55 31.3200 -97.3300 251.000 30.0 141.458 3.520 -999.990 -999.990 1.415 ..P WKT 2011 04 04 16 44 55 31.3200 -97.3300 251.000 122.0 145.460 3.720 -999.990 -999.990 1.455 ..P WKT 2011 04 04 16 49 55 31.3200 -97.3300 251.000 457.0 145.824 4.630 -999.990 -999.990 1.458 ..P WKT 2011 04 04 17 04 55 31.3200 -97.3300 251.000 30.0 145.503 3.350 -999.990 -999.990 1.455 ..P WKT 2011 04 04 17 09 55 31.3200 -97.3300 251.000 122.0 143.589 3.480 -999.990 -999.990 1.436 ..P WKT 2011 04 04 17 14 55 31.3200 -97.3300 251.000 457.0 147.297 3.110 -999.990 -999.990 1.473 ..P WKT 2011 04 04 17 19 55 31.3200 -97.3300 251.000 30.0 153.322 4.210 -999.990 -999.990 1.533 ..P WKT 2011 04 04 17 24 55 31.3200 -97.3300 251.000 122.0 141.979 3.150 -999.990 -999.990 1.420 ..P WKT 2011 04 04 17 29 55 31.3200 -97.3300 251.000 457.0 147.674 4.330 -999.990 -999.990 1.477 ..P WKT 2011 04 04 17 39 55 31.3200 -97.3300 251.000 30.0 144.469 3.210 -999.990 -999.990 1.445 ..P WKT 2011 04 04 17 44 55 31.3200 -97.3300 251.000 122.0 142.187 3.190 -999.990 -999.990 1.422 ..P WKT 2011 04 04 17 49 55 31.3200 -97.3300 251.000 457.0 143.215 3.770 -999.990 -999.990 1.432 ..P WKT 2011 04 04 17 54 55 31.3200 -97.3300 251.000 30.0 143.249 3.680 -999.990 -999.990 1.432 ..P WKT 2011 04 04 17 59 55 31.3200 -97.3300 251.000 122.0 142.953 4.800 -999.990 -999.990 1.430 ..P WKT 2011 04 04 18 04 55 31.3200 -97.3300 251.000 457.0 141.001 4.440 -999.990 -999.990 1.410 ..P WKT 2011 04 04 18 14 55 31.3200 -97.3300 251.000 30.0 140.124 4.590 -999.990 -999.990 1.401 ..P WKT 2011 04 04 18 19 55 31.3200 -97.3300 251.000 122.0 132.591 3.860 -999.990 -999.990 1.326 ..P WKT 2011 04 04 18 24 55 31.3200 -97.3300 251.000 457.0 140.618 3.760 -999.990 -999.990 1.406 ..P WKT 2011 04 04 18 29 55 31.3200 -97.3300 251.000 30.0 137.388 5.080 -999.990 -999.990 1.374 ..P WKT 2011 04 04 18 34 55 31.3200 -97.3300 251.000 122.0 144.423 3.450 -999.990 -999.990 1.444 ..P WKT 2011 04 04 18 39 55 31.3200 -97.3300 251.000 457.0 142.518 4.000 -999.990 -999.990 1.425 ..P WKT 2011 04 04 18 49 55 31.3200 -97.3300 251.000 30.0 146.277 3.040 -999.990 -999.990 1.463 ..P WKT 2011 04 04 18 54 55 31.3200 -97.3300 251.000 122.0 138.362 3.390 -999.990 -999.990 1.384 ..P WKT 2011 04 04 18 59 55 31.3200 -97.3300 251.000 457.0 141.709 2.780 -999.990 -999.990 1.417 ..P WKT 2011 04 04 19 04 55 31.3200 -97.3300 251.000 30.0 148.038 3.080 -999.990 -999.990 1.480 ..P WKT 2011 04 04 19 09 55 31.3200 -97.3300 251.000 122.0 140.784 3.560 -999.990 -999.990 1.408 ..P WKT 2011 04 04 19 14 55 31.3200 -97.3300 251.000 457.0 143.800 2.980 -999.990 -999.990 1.438 ..P WKT 2011 04 04 19 24 55 31.3200 -97.3300 251.000 30.0 142.377 2.900 -999.990 -999.990 1.424 ..P WKT 2011 04 04 19 29 55 31.3200 -97.3300 251.000 122.0 149.868 3.050 -999.990 -999.990 1.499 ..P WKT 2011 04 04 19 34 55 31.3200 -97.3300 251.000 457.0 140.457 3.420 -999.990 -999.990 1.405 ..P WKT 2011 04 04 19 39 55 31.3200 -97.3300 251.000 30.0 141.818 3.110 -999.990 -999.990 1.418 ..P WKT 2011 04 04 19 44 55 31.3200 -97.3300 251.000 122.0 146.990 5.160 -999.990 -999.990 1.470 ..P WKT 2011 04 04 19 49 55 31.3200 -97.3300 251.000 457.0 141.887 2.950 -999.990 -999.990 1.419 ..P WKT 2011 04 04 19 59 55 31.3200 -97.3300 251.000 30.0 143.968 3.130 -999.990 -999.990 1.440 ..P WKT 2011 04 04 20 04 55 31.3200 -97.3300 251.000 122.0 141.208 3.590 -999.990 -999.990 1.412 ..P WKT 2011 04 04 20 09 55 31.3200 -97.3300 251.000 457.0 142.260 3.670 -999.990 -999.990 1.423 ..P WKT 2011 04 04 20 14 55 31.3200 -97.3300 251.000 30.0 140.992 3.360 -999.990 -999.990 1.410 ..P WKT 2011 04 04 20 19 55 31.3200 -97.3300 251.000 122.0 141.713 3.690 -999.990 -999.990 1.417 ..P WKT 2011 04 04 20 24 55 31.3200 -97.3300 251.000 457.0 137.129 3.810 -999.990 -999.990 1.371 ..P WKT 2011 04 04 20 34 55 31.3200 -97.3300 251.000 30.0 137.884 3.950 -999.990 -999.990 1.379 ..P WKT 2011 04 04 20 39 55 31.3200 -97.3300 251.000 122.0 140.240 3.940 -999.990 -999.990 1.402 ..P WKT 2011 04 04 20 44 55 31.3200 -97.3300 251.000 457.0 138.781 4.210 -999.990 -999.990 1.388 ..P WKT 2011 04 04 20 49 55 31.3200 -97.3300 251.000 30.0 136.991 4.020 -999.990 -999.990 1.370 ..P WKT 2011 04 04 20 54 55 31.3200 -97.3300 251.000 122.0 135.532 4.090 -999.990 -999.990 1.355 ..P WKT 2011 04 04 20 59 55 31.3200 -97.3300 251.000 457.0 135.732 4.930 -999.990 -999.990 1.357 ..P WKT 2011 04 04 21 09 55 31.3200 -97.3300 251.000 30.0 141.702 4.600 -999.990 -999.990 1.417 ..P WKT 2011 04 04 21 14 55 31.3200 -97.3300 251.000 122.0 143.159 4.490 -999.990 -999.990 1.432 ..P WKT 2011 04 04 21 19 55 31.3200 -97.3300 251.000 457.0 139.305 3.970 -999.990 -999.990 1.393 ..P WKT 2011 04 04 21 24 55 31.3200 -97.3300 251.000 30.0 143.916 4.500 -999.990 -999.990 1.439 ..P WKT 2011 04 04 21 29 55 31.3200 -97.3300 251.000 122.0 141.887 4.070 -999.990 -999.990 1.419 ..P WKT 2011 04 04 21 34 55 31.3200 -97.3300 251.000 457.0 149.486 3.720 -999.990 -999.990 1.495 ..P WKT 2011 04 04 21 44 55 31.3200 -97.3300 251.000 30.0 141.089 4.940 -999.990 -999.990 1.411 ..P WKT 2011 04 04 21 49 55 31.3200 -97.3300 251.000 122.0 143.021 4.430 -999.990 -999.990 1.430 ..P WKT 2011 04 04 21 54 55 31.3200 -97.3300 251.000 457.0 140.968 3.820 -999.990 -999.990 1.410 ..P WKT 2011 04 04 21 59 55 31.3200 -97.3300 251.000 30.0 140.576 3.880 -999.990 -999.990 1.406 ..P WKT 2011 04 04 22 00 25 31.3200 -97.3300 251.000 30.0 143.127 3.570 -999.990 -999.990 1.431 ..P WKT 2011 04 04 22 00 55 31.3200 -97.3300 251.000 30.0 142.158 4.080 -999.990 -999.990 1.422 ..P WKT 2011 04 04 22 01 25 31.3200 -97.3300 251.000 30.0 140.458 4.470 -999.990 -999.990 1.405 ..P WKT 2011 04 04 22 01 55 31.3200 -97.3300 251.000 30.0 146.396 3.630 -999.990 -999.990 1.464 ..P WKT 2011 04 04 22 02 25 31.3200 -97.3300 251.000 30.0 145.361 3.670 -999.990 -999.990 1.454 ..P WKT 2011 04 04 22 02 55 31.3200 -97.3300 251.000 30.0 145.155 3.690 -999.990 -999.990 1.452 ..P WKT 2011 04 04 22 03 25 31.3200 -97.3300 251.000 30.0 147.275 4.140 -999.990 -999.990 1.473 ..P WKT 2011 04 04 22 03 55 31.3200 -97.3300 251.000 30.0 142.254 3.790 -999.990 -999.990 1.423 ..P WKT 2011 04 04 22 04 25 31.3200 -97.3300 251.000 30.0 138.561 3.670 -999.990 -999.990 1.386 ..P WKT 2011 04 04 22 04 55 31.3200 -97.3300 251.000 30.0 140.515 4.260 -999.990 -999.990 1.405 ..P WKT 2011 04 04 22 09 55 31.3200 -97.3300 251.000 457.0 141.118 4.360 -999.990 -999.990 1.411 ..P WKT 2011 04 04 22 19 55 31.3200 -97.3300 251.000 30.0 141.282 3.730 -999.990 -999.990 1.413 ..P WKT 2011 04 04 22 24 55 31.3200 -97.3300 251.000 122.0 146.489 3.500 -999.990 -999.990 1.465 ..P WKT 2011 04 04 22 29 55 31.3200 -97.3300 251.000 457.0 148.375 4.410 -999.990 -999.990 1.484 ..P WKT 2011 04 04 22 34 55 31.3200 -97.3300 251.000 30.0 149.265 4.010 -999.990 -999.990 1.493 ..P WKT 2011 04 04 22 39 55 31.3200 -97.3300 251.000 122.0 151.484 3.840 -999.990 -999.990 1.515 ..P WKT 2011 04 04 22 44 55 31.3200 -97.3300 251.000 457.0 149.383 3.560 -999.990 -999.990 1.494 ..P WKT 2011 04 04 22 54 55 31.3200 -97.3300 251.000 30.0 151.922 3.700 -999.990 -999.990 1.519 ..P WKT 2011 04 04 22 59 55 31.3200 -97.3300 251.000 122.0 144.265 4.100 -999.990 -999.990 1.443 ..P WKT 2011 04 04 23 04 55 31.3200 -97.3300 251.000 457.0 153.891 4.190 -999.990 -999.990 1.539 ..P WKT 2011 04 04 23 09 55 31.3200 -97.3300 251.000 30.0 153.879 4.290 -999.990 -999.990 1.539 ..P WKT 2011 04 04 23 14 55 31.3200 -97.3300 251.000 122.0 152.870 5.150 -999.990 -999.990 1.529 ..P WKT 2011 04 04 23 19 55 31.3200 -97.3300 251.000 457.0 154.519 5.520 -999.990 -999.990 1.545 ..P WKT 2011 04 04 23 29 55 31.3200 -97.3300 251.000 30.0 145.475 4.840 -999.990 -999.990 1.455 ..P WKT 2011 04 04 23 34 55 31.3200 -97.3300 251.000 122.0 148.746 6.700 -999.990 -999.990 1.487 ..P WKT 2011 04 04 23 39 55 31.3200 -97.3300 251.000 457.0 147.362 5.040 -999.990 -999.990 1.474 ..P WKT 2011 04 04 23 44 55 31.3200 -97.3300 251.000 30.0 149.303 4.160 -999.990 -999.990 1.493 ..P WKT 2011 04 04 23 49 55 31.3200 -97.3300 251.000 122.0 143.262 4.040 -999.990 -999.990 1.433 ..P WKT 2011 04 05 00 09 55 31.3200 -97.3300 251.000 457.0 140.162 4.070 -999.990 -999.990 1.402 ..P WKT 2011 04 05 00 10 25 31.3200 -97.3300 251.000 457.0 147.667 4.490 -999.990 -999.990 1.477 ..P WKT 2011 04 05 00 10 55 31.3200 -97.3300 251.000 457.0 147.354 4.000 -999.990 -999.990 1.474 ..P WKT 2011 04 05 00 11 25 31.3200 -97.3300 251.000 457.0 149.038 3.860 -999.990 -999.990 1.490 ..P WKT 2011 04 05 00 11 55 31.3200 -97.3300 251.000 457.0 146.563 3.570 -999.990 -999.990 1.466 ..P WKT 2011 04 05 00 12 25 31.3200 -97.3300 251.000 457.0 151.074 4.080 -999.990 -999.990 1.511 ..P WKT 2011 04 05 00 12 55 31.3200 -97.3300 251.000 457.0 150.428 3.960 -999.990 -999.990 1.504 ..P WKT 2011 04 05 00 13 25 31.3200 -97.3300 251.000 457.0 147.454 3.690 -999.990 -999.990 1.475 ..P WKT 2011 04 05 00 13 55 31.3200 -97.3300 251.000 457.0 148.472 3.650 -999.990 -999.990 1.485 ..P WKT 2011 04 05 00 14 25 31.3200 -97.3300 251.000 457.0 148.991 3.600 -999.990 -999.990 1.490 ..P WKT 2011 04 05 00 14 55 31.3200 -97.3300 251.000 457.0 148.346 3.620 -999.990 -999.990 1.483 ..P WKT 2011 04 05 00 19 55 31.3200 -97.3300 251.000 30.0 146.385 4.080 -999.990 -999.990 1.464 ..P WKT 2011 04 05 00 24 55 31.3200 -97.3300 251.000 122.0 153.237 4.640 -999.990 -999.990 1.532 ..P WKT 2011 04 05 00 29 55 31.3200 -97.3300 251.000 457.0 149.612 4.460 -999.990 -999.990 1.496 ..P WKT 2011 04 05 00 34 55 31.3200 -97.3300 251.000 30.0 151.975 4.540 -999.990 -999.990 1.520 ..P WKT 2011 04 05 00 39 55 31.3200 -97.3300 251.000 122.0 151.011 4.000 -999.990 -999.990 1.510 ..P WKT 2011 04 05 00 44 55 31.3200 -97.3300 251.000 457.0 150.047 3.760 -999.990 -999.990 1.500 ..P WKT 2011 04 05 00 54 55 31.3200 -97.3300 251.000 30.0 145.326 3.680 -999.990 -999.990 1.453 ..P WKT 2011 04 05 00 59 55 31.3200 -97.3300 251.000 122.0 146.392 4.280 -999.990 -999.990 1.464 ..P WKT 2011 04 05 01 04 55 31.3200 -97.3300 251.000 457.0 147.126 4.750 -999.990 -999.990 1.471 ..P WKT 2011 04 05 01 09 55 31.3200 -97.3300 251.000 30.0 140.873 5.060 -999.990 -999.990 1.409 ..P WKT 2011 04 05 01 14 55 31.3200 -97.3300 251.000 122.0 144.434 5.420 -999.990 -999.990 1.444 ..P WKT 2011 04 05 01 19 55 31.3200 -97.3300 251.000 457.0 145.501 4.390 -999.990 -999.990 1.455 ..P WKT 2011 04 05 01 29 55 31.3200 -97.3300 251.000 30.0 139.554 4.200 -999.990 -999.990 1.396 ..P WKT 2011 04 05 01 34 55 31.3200 -97.3300 251.000 122.0 145.515 4.170 -999.990 -999.990 1.455 ..P WKT 2011 04 05 01 39 55 31.3200 -97.3300 251.000 457.0 146.320 5.110 -999.990 -999.990 1.463 ..P WKT 2011 04 05 01 44 55 31.3200 -97.3300 251.000 30.0 137.311 4.500 -999.990 -999.990 1.373 ..P WKT 2011 04 05 01 49 55 31.3200 -97.3300 251.000 122.0 143.606 4.110 -999.990 -999.990 1.436 ..P WKT 2011 04 05 01 54 55 31.3200 -97.3300 251.000 457.0 140.750 3.830 -999.990 -999.990 1.407 ..P WKT 2011 04 05 02 04 55 31.3200 -97.3300 251.000 30.0 144.903 4.190 -999.990 -999.990 1.449 ..P WKT 2011 04 05 02 09 55 31.3200 -97.3300 251.000 122.0 150.414 4.010 -999.990 -999.990 1.504 ..P WKT 2011 04 05 02 14 55 31.3200 -97.3300 251.000 457.0 151.931 4.350 -999.990 -999.990 1.519 ..P WKT 2011 04 05 02 19 55 31.3200 -97.3300 251.000 30.0 149.124 4.320 -999.990 -999.990 1.491 ..P WKT 2011 04 05 02 24 55 31.3200 -97.3300 251.000 122.0 149.977 4.850 -999.990 -999.990 1.500 ..P WKT 2011 04 05 02 29 55 31.3200 -97.3300 251.000 457.0 146.836 4.710 -999.990 -999.990 1.468 ..P WKT 2011 04 05 02 39 55 31.3200 -97.3300 251.000 30.0 142.553 4.720 -999.990 -999.990 1.426 ..P WKT 2011 04 05 02 44 55 31.3200 -97.3300 251.000 122.0 152.388 4.360 -999.990 -999.990 1.524 ..P WKT 2011 04 05 02 49 55 31.3200 -97.3300 251.000 457.0 143.592 4.500 -999.990 -999.990 1.436 ..P WKT 2011 04 05 02 54 55 31.3200 -97.3300 251.000 30.0 146.774 4.220 -999.990 -999.990 1.468 ..P WKT 2011 04 05 02 59 55 31.3200 -97.3300 251.000 122.0 144.299 4.680 -999.990 -999.990 1.443 ..P WKT 2011 04 05 03 04 55 31.3200 -97.3300 251.000 457.0 143.155 4.500 -999.990 -999.990 1.432 ..P WKT 2011 04 05 03 14 55 31.3200 -97.3300 251.000 30.0 149.281 3.780 -999.990 -999.990 1.493 ..P WKT 2011 04 05 03 19 55 31.3200 -97.3300 251.000 122.0 147.899 3.810 -999.990 -999.990 1.479 ..P WKT 2011 04 05 03 24 55 31.3200 -97.3300 251.000 457.0 143.191 4.480 -999.990 -999.990 1.432 ..P WKT 2011 04 05 03 29 55 31.3200 -97.3300 251.000 30.0 154.120 4.650 -999.990 -999.990 1.541 ..P WKT 2011 04 05 03 34 55 31.3200 -97.3300 251.000 122.0 150.410 4.350 -999.990 -999.990 1.504 ..P WKT 2011 04 05 03 39 55 31.3200 -97.3300 251.000 457.0 143.704 4.350 -999.990 -999.990 1.437 ..P WKT 2011 04 05 03 49 55 31.3200 -97.3300 251.000 30.0 149.498 4.810 -999.990 -999.990 1.495 ..P WKT 2011 04 05 03 54 55 31.3200 -97.3300 251.000 122.0 146.357 4.640 -999.990 -999.990 1.464 ..P WKT 2011 04 05 03 59 55 31.3200 -97.3300 251.000 457.0 144.381 4.830 -999.990 -999.990 1.444 ..P WKT 2011 04 05 04 04 55 31.3200 -97.3300 251.000 30.0 145.233 5.160 -999.990 -999.990 1.452 ..P WKT 2011 04 05 04 09 55 31.3200 -97.3300 251.000 122.0 146.752 5.060 -999.990 -999.990 1.468 ..P WKT 2011 04 05 04 14 55 31.3200 -97.3300 251.000 457.0 144.610 4.240 -999.990 -999.990 1.446 ..P WKT 2011 04 05 04 24 55 31.3200 -97.3300 251.000 30.0 146.196 3.880 -999.990 -999.990 1.462 ..P WKT 2011 04 05 04 29 55 31.3200 -97.3300 251.000 122.0 143.437 5.710 -999.990 -999.990 1.434 ..P WKT 2011 04 05 04 34 55 31.3200 -97.3300 251.000 457.0 143.671 5.130 -999.990 -999.990 1.437 ..P WKT 2011 04 05 04 39 55 31.3200 -97.3300 251.000 30.0 142.741 4.850 -999.990 -999.990 1.427 ..P WKT 2011 04 05 04 44 55 31.3200 -97.3300 251.000 122.0 150.630 4.990 -999.990 -999.990 1.506 ..P WKT 2011 04 05 04 49 55 31.3200 -97.3300 251.000 457.0 145.373 4.450 -999.990 -999.990 1.454 ..P WKT 2011 04 05 05 04 55 31.3200 -97.3300 251.000 30.0 144.437 4.520 -999.990 -999.990 1.444 ..P WKT 2011 04 05 05 09 55 31.3200 -97.3300 251.000 122.0 154.001 4.020 -999.990 -999.990 1.540 ..P WKT 2011 04 05 05 14 55 31.3200 -97.3300 251.000 457.0 151.918 4.290 -999.990 -999.990 1.519 ..P WKT 2011 04 05 05 19 55 31.3200 -97.3300 251.000 30.0 144.677 4.690 -999.990 -999.990 1.447 ..P WKT 2011 04 05 05 24 55 31.3200 -97.3300 251.000 122.0 156.405 4.380 -999.990 -999.990 1.564 ..P WKT 2011 04 05 05 29 55 31.3200 -97.3300 251.000 457.0 147.500 4.110 -999.990 -999.990 1.475 ..P WKT 2011 04 05 05 39 55 31.3200 -97.3300 251.000 30.0 144.819 4.850 -999.990 -999.990 1.448 ..P WKT 2011 04 05 05 44 55 31.3200 -97.3300 251.000 122.0 151.045 4.530 -999.990 -999.990 1.510 ..P WKT 2011 04 05 05 49 55 31.3200 -97.3300 251.000 457.0 146.121 5.230 -999.990 -999.990 1.461 ..P WKT 2011 04 05 05 54 55 31.3200 -97.3300 251.000 30.0 143.526 5.280 -999.990 -999.990 1.435 ..P WKT 2011 04 05 05 59 55 31.3200 -97.3300 251.000 122.0 153.745 4.170 -999.990 -999.990 1.537 ..P WKT 2011 04 05 06 04 55 31.3200 -97.3300 251.000 457.0 146.326 4.300 -999.990 -999.990 1.463 ..P WKT 2011 04 05 06 14 55 31.3200 -97.3300 251.000 30.0 155.924 4.730 -999.990 -999.990 1.559 ..P WKT 2011 04 05 06 19 55 31.3200 -97.3300 251.000 122.0 151.642 4.480 -999.990 -999.990 1.516 ..P WKT 2011 04 05 06 24 55 31.3200 -97.3300 251.000 457.0 145.696 3.860 -999.990 -999.990 1.457 ..P WKT 2011 04 05 06 29 55 31.3200 -97.3300 251.000 30.0 157.389 3.940 -999.990 -999.990 1.574 ..P WKT 2011 04 05 06 34 55 31.3200 -97.3300 251.000 122.0 161.760 5.000 -999.990 -999.990 1.618 ..P WKT 2011 04 05 06 39 55 31.3200 -97.3300 251.000 457.0 148.825 4.040 -999.990 -999.990 1.488 ..P WKT 2011 04 05 06 49 55 31.3200 -97.3300 251.000 30.0 151.719 4.480 -999.990 -999.990 1.517 ..P WKT 2011 04 05 06 54 55 31.3200 -97.3300 251.000 122.0 155.567 3.860 -999.990 -999.990 1.556 ..P WKT 2011 04 05 06 59 55 31.3200 -97.3300 251.000 457.0 151.761 4.050 -999.990 -999.990 1.518 ..P WKT 2011 04 05 07 04 55 31.3200 -97.3300 251.000 30.0 149.286 4.300 -999.990 -999.990 1.493 ..P WKT 2011 04 05 07 09 55 31.3200 -97.3300 251.000 122.0 156.129 3.950 -999.990 -999.990 1.561 ..P WKT 2011 04 05 07 14 55 31.3200 -97.3300 251.000 457.0 144.335 3.840 -999.990 -999.990 1.443 ..P WKT 2011 04 05 07 24 55 31.3200 -97.3300 251.000 30.0 148.370 4.790 -999.990 -999.990 1.484 ..P WKT 2011 04 05 07 29 55 31.3200 -97.3300 251.000 122.0 153.883 4.060 -999.990 -999.990 1.539 ..P WKT 2011 04 05 07 34 55 31.3200 -97.3300 251.000 457.0 139.757 4.630 -999.990 -999.990 1.398 ..P WKT 2011 04 05 07 39 55 31.3200 -97.3300 251.000 30.0 164.908 4.670 -999.990 -999.990 1.649 ..P WKT 2011 04 05 07 44 55 31.3200 -97.3300 251.000 122.0 155.443 4.310 -999.990 -999.990 1.554 ..P WKT 2011 04 05 07 49 55 31.3200 -97.3300 251.000 457.0 150.637 4.330 -999.990 -999.990 1.506 ..P WKT 2011 04 05 07 59 55 31.3200 -97.3300 251.000 30.0 162.899 5.450 -999.990 -999.990 1.629 ..P WKT 2011 04 05 08 04 55 31.3200 -97.3300 251.000 122.0 150.675 5.090 -999.990 -999.990 1.507 ..P WKT 2011 04 05 08 09 55 31.3200 -97.3300 251.000 457.0 150.434 4.880 -999.990 -999.990 1.504 ..P WKT 2011 04 05 08 14 55 31.3200 -97.3300 251.000 30.0 161.511 5.280 -999.990 -999.990 1.615 ..P WKT 2011 04 05 08 19 55 31.3200 -97.3300 251.000 122.0 159.273 5.050 -999.990 -999.990 1.593 ..P WKT 2011 04 05 08 24 55 31.3200 -97.3300 251.000 457.0 140.225 4.650 -999.990 -999.990 1.402 ..P WKT 2011 04 05 08 34 55 31.3200 -97.3300 251.000 30.0 157.172 4.690 -999.990 -999.990 1.572 ..P WKT 2011 04 05 08 39 55 31.3200 -97.3300 251.000 122.0 156.884 5.070 -999.990 -999.990 1.569 ..P WKT 2011 04 05 08 44 55 31.3200 -97.3300 251.000 457.0 142.948 7.190 -999.990 -999.990 1.429 ..P WKT 2011 04 05 08 49 55 31.3200 -97.3300 251.000 30.0 161.467 4.810 -999.990 -999.990 1.615 ..P WKT 2011 04 05 08 54 55 31.3200 -97.3300 251.000 122.0 156.519 4.470 -999.990 -999.990 1.565 ..P WKT 2011 04 05 08 59 55 31.3200 -97.3300 251.000 457.0 143.748 4.760 -999.990 -999.990 1.437 ..P WKT 2011 04 05 09 09 55 31.3200 -97.3300 251.000 30.0 175.984 4.190 -999.990 -999.990 1.760 ..P WKT 2011 04 05 09 14 55 31.3200 -97.3300 251.000 122.0 156.246 4.360 -999.990 -999.990 1.562 ..P WKT 2011 04 05 09 19 55 31.3200 -97.3300 251.000 457.0 150.155 4.620 -999.990 -999.990 1.502 ..P WKT 2011 04 05 09 24 55 31.3200 -97.3300 251.000 30.0 164.205 4.710 -999.990 -999.990 1.642 ..P WKT 2011 04 05 09 29 55 31.3200 -97.3300 251.000 122.0 159.447 5.450 -999.990 -999.990 1.594 ..P WKT 2011 04 05 09 34 55 31.3200 -97.3300 251.000 457.0 144.202 4.800 -999.990 -999.990 1.442 ..P WKT 2011 04 05 09 44 55 31.3200 -97.3300 251.000 30.0 161.816 4.800 -999.990 -999.990 1.618 ..P WKT 2011 04 05 09 49 55 31.3200 -97.3300 251.000 122.0 148.068 5.020 -999.990 -999.990 1.481 ..P WKT 2011 04 05 09 54 55 31.3200 -97.3300 251.000 457.0 140.480 4.480 -999.990 -999.990 1.405 ..P WKT 2011 04 05 09 59 55 31.3200 -97.3300 251.000 30.0 164.518 5.020 -999.990 -999.990 1.645 ..P WKT 2011 04 05 10 04 55 31.3200 -97.3300 251.000 122.0 150.937 3.970 -999.990 -999.990 1.509 ..P WKT 2011 04 05 10 09 55 31.3200 -97.3300 251.000 457.0 146.677 4.940 -999.990 -999.990 1.467 ..P WKT 2011 04 05 10 19 55 31.3200 -97.3300 251.000 30.0 167.906 4.390 -999.990 -999.990 1.679 ..P WKT 2011 04 05 10 24 55 31.3200 -97.3300 251.000 122.0 151.447 4.370 -999.990 -999.990 1.514 ..P WKT 2011 04 05 10 29 55 31.3200 -97.3300 251.000 457.0 143.644 3.960 -999.990 -999.990 1.436 ..P WKT 2011 04 05 10 34 55 31.3200 -97.3300 251.000 30.0 166.470 4.200 -999.990 -999.990 1.665 ..P WKT 2011 04 05 10 39 55 31.3200 -97.3300 251.000 122.0 151.010 4.020 -999.990 -999.990 1.510 ..P WKT 2011 04 05 10 44 55 31.3200 -97.3300 251.000 457.0 139.878 4.060 -999.990 -999.990 1.399 ..P WKT 2011 04 05 10 54 55 31.3200 -97.3300 251.000 30.0 160.181 5.600 -999.990 -999.990 1.602 ..P WKT 2011 04 05 10 59 55 31.3200 -97.3300 251.000 122.0 155.992 3.900 -999.990 -999.990 1.560 ..P WKT 2011 04 05 11 04 55 31.3200 -97.3300 251.000 457.0 143.148 3.880 -999.990 -999.990 1.431 ..P WKT 2011 04 05 11 09 55 31.3200 -97.3300 251.000 30.0 161.266 3.980 -999.990 -999.990 1.613 ..P WKT 2011 04 05 11 14 55 31.3200 -97.3300 251.000 122.0 153.748 3.920 -999.990 -999.990 1.537 ..P WKT 2011 04 05 11 19 55 31.3200 -97.3300 251.000 457.0 147.562 4.610 -999.990 -999.990 1.476 ..P WKT 2011 04 05 11 29 55 31.3200 -97.3300 251.000 30.0 156.210 4.280 -999.990 -999.990 1.562 ..P WKT 2011 04 05 11 34 55 31.3200 -97.3300 251.000 122.0 150.068 4.030 -999.990 -999.990 1.501 ..P WKT 2011 04 05 11 39 55 31.3200 -97.3300 251.000 457.0 146.589 4.400 -999.990 -999.990 1.466 ..P WKT 2011 04 05 11 44 55 31.3200 -97.3300 251.000 30.0 154.432 3.940 -999.990 -999.990 1.544 ..P WKT 2011 04 05 11 49 55 31.3200 -97.3300 251.000 122.0 154.283 4.460 -999.990 -999.990 1.543 ..P WKT 2011 04 05 12 09 55 31.3200 -97.3300 251.000 457.0 149.817 4.660 -999.990 -999.990 1.498 ..P WKT 2011 04 05 12 10 25 31.3200 -97.3300 251.000 457.0 149.012 4.200 -999.990 -999.990 1.490 ..P WKT 2011 04 05 12 10 55 31.3200 -97.3300 251.000 457.0 148.708 4.170 -999.990 -999.990 1.487 ..P WKT 2011 04 05 12 11 25 31.3200 -97.3300 251.000 457.0 153.232 4.580 -999.990 -999.990 1.532 ..P WKT 2011 04 05 12 11 55 31.3200 -97.3300 251.000 457.0 153.260 4.320 -999.990 -999.990 1.533 ..P WKT 2011 04 05 12 12 25 31.3200 -97.3300 251.000 457.0 151.458 3.970 -999.990 -999.990 1.515 ..P WKT 2011 04 05 12 12 55 31.3200 -97.3300 251.000 457.0 153.650 4.040 -999.990 -999.990 1.537 ..P WKT 2011 04 05 12 13 25 31.3200 -97.3300 251.000 457.0 148.518 4.250 -999.990 -999.990 1.485 ..P WKT 2011 04 05 12 13 55 31.3200 -97.3300 251.000 457.0 144.052 4.330 -999.990 -999.990 1.441 ..P WKT 2011 04 05 12 14 25 31.3200 -97.3300 251.000 457.0 148.242 4.670 -999.990 -999.990 1.482 ..P WKT 2011 04 05 12 14 55 31.3200 -97.3300 251.000 457.0 146.939 4.150 -999.990 -999.990 1.469 ..P WKT 2011 04 05 12 19 55 31.3200 -97.3300 251.000 30.0 173.193 5.130 -999.990 -999.990 1.732 ..P WKT 2011 04 05 12 24 55 31.3200 -97.3300 251.000 122.0 149.840 4.020 -999.990 -999.990 1.498 ..P WKT 2011 04 05 12 29 55 31.3200 -97.3300 251.000 457.0 153.620 4.390 -999.990 -999.990 1.536 ..P WKT 2011 04 05 12 34 55 31.3200 -97.3300 251.000 30.0 163.393 4.660 -999.990 -999.990 1.634 ..P WKT 2011 04 05 12 39 55 31.3200 -97.3300 251.000 122.0 153.691 4.280 -999.990 -999.990 1.537 ..P WKT 2011 04 05 12 44 55 31.3200 -97.3300 251.000 457.0 156.473 4.960 -999.990 -999.990 1.565 ..P WKT 2011 04 05 12 54 55 31.3200 -97.3300 251.000 30.0 160.213 4.360 -999.990 -999.990 1.602 ..P WKT 2011 04 05 12 59 55 31.3200 -97.3300 251.000 122.0 158.010 4.340 -999.990 -999.990 1.580 ..P WKT 2011 04 05 13 04 55 31.3200 -97.3300 251.000 457.0 155.140 5.450 -999.990 -999.990 1.551 ..P WKT 2011 04 05 13 09 55 31.3200 -97.3300 251.000 30.0 155.600 4.730 -999.990 -999.990 1.556 ..P WKT 2011 04 05 13 14 55 31.3200 -97.3300 251.000 122.0 154.895 6.050 -999.990 -999.990 1.549 ..P WKT 2011 04 05 13 19 55 31.3200 -97.3300 251.000 457.0 150.195 4.440 -999.990 -999.990 1.502 ..P WKT 2011 04 05 13 29 55 31.3200 -97.3300 251.000 30.0 159.220 4.310 -999.990 -999.990 1.592 ..P WKT 2011 04 05 13 34 55 31.3200 -97.3300 251.000 122.0 149.647 4.230 -999.990 -999.990 1.496 ..P WKT 2011 04 05 13 39 55 31.3200 -97.3300 251.000 457.0 147.729 4.600 -999.990 -999.990 1.477 ..P WKT 2011 04 05 13 44 55 31.3200 -97.3300 251.000 30.0 156.628 4.170 -999.990 -999.990 1.566 ..P WKT 2011 04 05 13 49 55 31.3200 -97.3300 251.000 122.0 151.549 4.150 -999.990 -999.990 1.515 ..P WKT 2011 04 05 13 54 55 31.3200 -97.3300 251.000 457.0 149.797 4.250 -999.990 -999.990 1.498 ..P WKT 2011 04 05 14 04 55 31.3200 -97.3300 251.000 30.0 157.204 4.130 -999.990 -999.990 1.572 ..P WKT 2011 04 05 14 09 55 31.3200 -97.3300 251.000 122.0 157.878 4.020 -999.990 -999.990 1.579 ..P WKT 2011 04 05 14 14 55 31.3200 -97.3300 251.000 457.0 150.232 4.570 -999.990 -999.990 1.502 ..P WKT 2011 04 05 14 19 55 31.3200 -97.3300 251.000 30.0 156.562 4.230 -999.990 -999.990 1.566 ..P WKT 2011 04 05 14 24 55 31.3200 -97.3300 251.000 122.0 158.899 4.740 -999.990 -999.990 1.589 ..P WKT 2011 04 05 14 29 55 31.3200 -97.3300 251.000 457.0 147.260 4.390 -999.990 -999.990 1.473 ..P WKT 2011 04 05 14 39 55 31.3200 -97.3300 251.000 30.0 156.782 4.200 -999.990 -999.990 1.568 ..P WKT 2011 04 05 14 44 55 31.3200 -97.3300 251.000 122.0 154.651 3.680 -999.990 -999.990 1.547 ..P WKT 2011 04 05 14 49 55 31.3200 -97.3300 251.000 457.0 142.539 4.530 -999.990 -999.990 1.425 ..P WKT 2011 04 05 14 54 55 31.3200 -97.3300 251.000 30.0 159.039 4.160 -999.990 -999.990 1.590 ..P WKT 2011 04 05 14 59 55 31.3200 -97.3300 251.000 122.0 155.910 4.150 -999.990 -999.990 1.559 ..P WKT 2011 04 05 15 04 55 31.3200 -97.3300 251.000 457.0 146.127 3.930 -999.990 -999.990 1.461 ..P WKT 2011 04 05 15 14 55 31.3200 -97.3300 251.000 30.0 171.331 3.930 -999.990 -999.990 1.713 ..P WKT 2011 04 05 15 19 55 31.3200 -97.3300 251.000 122.0 157.747 4.080 -999.990 -999.990 1.577 ..P WKT 2011 04 05 15 24 55 31.3200 -97.3300 251.000 457.0 154.475 4.110 -999.990 -999.990 1.545 ..P WKT 2011 04 05 15 29 55 31.3200 -97.3300 251.000 30.0 153.865 4.150 -999.990 -999.990 1.539 ..P WKT 2011 04 05 15 34 55 31.3200 -97.3300 251.000 122.0 156.914 4.290 -999.990 -999.990 1.569 ..P WKT 2011 04 05 15 39 55 31.3200 -97.3300 251.000 457.0 149.984 4.080 -999.990 -999.990 1.500 ..P WKT 2011 04 05 15 49 55 31.3200 -97.3300 251.000 30.0 160.049 4.210 -999.990 -999.990 1.600 ..P WKT 2011 04 05 15 54 55 31.3200 -97.3300 251.000 122.0 158.417 4.980 -999.990 -999.990 1.584 ..P WKT 2011 04 05 15 59 55 31.3200 -97.3300 251.000 457.0 157.284 4.220 -999.990 -999.990 1.573 ..P WKT 2011 04 05 16 04 55 31.3200 -97.3300 251.000 30.0 159.811 4.220 -999.990 -999.990 1.598 ..P WKT 2011 04 05 16 09 55 31.3200 -97.3300 251.000 122.0 160.174 4.630 -999.990 -999.990 1.602 ..P WKT 2011 04 05 16 14 55 31.3200 -97.3300 251.000 457.0 149.396 4.630 -999.990 -999.990 1.494 ..P WKT 2011 04 05 16 24 55 31.3200 -97.3300 251.000 30.0 155.826 4.550 -999.990 -999.990 1.558 ..P WKT 2011 04 05 16 29 55 31.3200 -97.3300 251.000 122.0 161.225 4.180 -999.990 -999.990 1.612 ..P WKT 2011 04 05 16 34 55 31.3200 -97.3300 251.000 457.0 155.983 3.570 -999.990 -999.990 1.560 ..P WKT 2011 04 05 16 39 55 31.3200 -97.3300 251.000 30.0 156.894 3.620 -999.990 -999.990 1.569 ..P WKT 2011 04 05 16 44 55 31.3200 -97.3300 251.000 122.0 158.136 3.560 -999.990 -999.990 1.581 ..P WKT 2011 04 05 16 49 55 31.3200 -97.3300 251.000 457.0 156.718 3.810 -999.990 -999.990 1.567 ..P WKT 2011 04 05 17 04 55 31.3200 -97.3300 251.000 30.0 158.225 3.710 -999.990 -999.990 1.582 ..P WKT 2011 04 05 17 09 55 31.3200 -97.3300 251.000 122.0 154.950 4.140 -999.990 -999.990 1.549 ..P WKT 2011 04 05 17 14 55 31.3200 -97.3300 251.000 457.0 159.487 5.090 -999.990 -999.990 1.595 ..P WKT 2011 04 05 17 19 55 31.3200 -97.3300 251.000 30.0 157.375 4.430 -999.990 -999.990 1.574 ..P WKT 2011 04 05 17 24 55 31.3200 -97.3300 251.000 122.0 162.744 4.170 -999.990 -999.990 1.627 ..P WKT 2011 04 05 17 29 55 31.3200 -97.3300 251.000 457.0 159.302 3.610 -999.990 -999.990 1.593 ..P WKT 2011 04 05 17 39 55 31.3200 -97.3300 251.000 30.0 148.554 3.620 -999.990 -999.990 1.486 ..P WKT 2011 04 05 17 44 55 31.3200 -97.3300 251.000 122.0 150.723 4.260 -999.990 -999.990 1.507 ..P WKT 2011 04 05 17 49 55 31.3200 -97.3300 251.000 457.0 151.894 5.110 -999.990 -999.990 1.519 ..P WKT 2011 04 05 17 54 55 31.3200 -97.3300 251.000 30.0 146.583 6.270 -999.990 -999.990 1.466 ..P WKT 2011 04 05 17 59 55 31.3200 -97.3300 251.000 122.0 151.577 5.390 -999.990 -999.990 1.516 ..P WKT 2011 04 05 18 04 55 31.3200 -97.3300 251.000 457.0 151.585 5.180 -999.990 -999.990 1.516 ..P WKT 2011 04 05 18 14 55 31.3200 -97.3300 251.000 30.0 152.455 4.460 -999.990 -999.990 1.525 ..P WKT 2011 04 05 18 19 55 31.3200 -97.3300 251.000 122.0 148.996 5.300 -999.990 -999.990 1.490 ..P WKT 2011 04 05 18 24 55 31.3200 -97.3300 251.000 457.0 148.861 6.250 -999.990 -999.990 1.489 ..P WKT 2011 04 05 18 29 55 31.3200 -97.3300 251.000 30.0 150.057 4.900 -999.990 -999.990 1.501 ..P WKT 2011 04 05 18 34 55 31.3200 -97.3300 251.000 122.0 152.581 4.420 -999.990 -999.990 1.526 ..P WKT 2011 04 05 18 39 55 31.3200 -97.3300 251.000 457.0 149.123 4.410 -999.990 -999.990 1.491 ..P WKT 2011 04 05 18 49 55 31.3200 -97.3300 251.000 30.0 151.987 4.710 -999.990 -999.990 1.520 ..P WKT 2011 04 05 18 54 55 31.3200 -97.3300 251.000 122.0 150.998 4.340 -999.990 -999.990 1.510 ..P WKT 2011 04 05 18 59 55 31.3200 -97.3300 251.000 457.0 148.347 4.880 -999.990 -999.990 1.483 ..P WKT 2011 04 05 19 04 55 31.3200 -97.3300 251.000 30.0 153.339 4.270 -999.990 -999.990 1.533 ..P WKT 2011 04 05 19 09 55 31.3200 -97.3300 251.000 122.0 150.356 3.570 -999.990 -999.990 1.504 ..P WKT 2011 04 05 19 14 55 31.3200 -97.3300 251.000 457.0 144.049 3.710 -999.990 -999.990 1.440 ..P WKT 2011 04 05 19 24 55 31.3200 -97.3300 251.000 30.0 146.036 3.230 -999.990 -999.990 1.460 ..P WKT 2011 04 05 19 29 55 31.3200 -97.3300 251.000 122.0 152.665 4.780 -999.990 -999.990 1.527 ..P WKT 2011 04 05 19 34 55 31.3200 -97.3300 251.000 457.0 146.335 3.710 -999.990 -999.990 1.463 ..P WKT 2011 04 05 19 39 55 31.3200 -97.3300 251.000 30.0 144.658 3.320 -999.990 -999.990 1.447 ..P WKT 2011 04 05 19 44 55 31.3200 -97.3300 251.000 122.0 150.624 3.150 -999.990 -999.990 1.506 ..P WKT 2011 04 05 19 49 55 31.3200 -97.3300 251.000 457.0 141.969 3.170 -999.990 -999.990 1.420 ..P WKT 2011 04 05 19 59 55 31.3200 -97.3300 251.000 30.0 149.057 3.370 -999.990 -999.990 1.491 ..P WKT 2011 04 05 20 04 55 31.3200 -97.3300 251.000 122.0 148.685 3.290 -999.990 -999.990 1.487 ..P WKT 2011 04 05 20 09 55 31.3200 -97.3300 251.000 457.0 152.798 3.640 -999.990 -999.990 1.528 ..P WKT 2011 04 05 20 14 55 31.3200 -97.3300 251.000 30.0 143.954 4.620 -999.990 -999.990 1.440 ..P WKT 2011 04 05 20 19 55 31.3200 -97.3300 251.000 122.0 150.891 3.630 -999.990 -999.990 1.509 ..P WKT 2011 04 05 20 24 55 31.3200 -97.3300 251.000 457.0 149.689 4.020 -999.990 -999.990 1.497 ..P WKT 2011 04 05 20 34 55 31.3200 -97.3300 251.000 30.0 144.009 3.680 -999.990 -999.990 1.440 ..P WKT 2011 04 05 20 39 55 31.3200 -97.3300 251.000 122.0 148.336 3.820 -999.990 -999.990 1.483 ..P WKT 2011 04 05 20 44 55 31.3200 -97.3300 251.000 457.0 148.177 3.910 -999.990 -999.990 1.482 ..P WKT 2011 04 05 20 49 55 31.3200 -97.3300 251.000 30.0 147.687 4.620 -999.990 -999.990 1.477 ..P WKT 2011 04 05 20 54 55 31.3200 -97.3300 251.000 122.0 155.500 4.930 -999.990 -999.990 1.555 ..P WKT 2011 04 05 20 59 55 31.3200 -97.3300 251.000 457.0 151.854 5.830 -999.990 -999.990 1.519 ..P WKT 2011 04 05 21 09 55 31.3200 -97.3300 251.000 30.0 155.784 5.720 -999.990 -999.990 1.558 ..P WKT 2011 04 05 21 14 55 31.3200 -97.3300 251.000 122.0 150.572 5.030 -999.990 -999.990 1.506 ..P WKT 2011 04 05 21 19 55 31.3200 -97.3300 251.000 457.0 148.350 4.600 -999.990 -999.990 1.484 ..P WKT 2011 04 05 21 24 55 31.3200 -97.3300 251.000 30.0 151.442 3.960 -999.990 -999.990 1.514 ..P WKT 2011 04 05 21 29 55 31.3200 -97.3300 251.000 122.0 153.039 4.500 -999.990 -999.990 1.530 ..P WKT 2011 04 05 21 34 55 31.3200 -97.3300 251.000 457.0 148.492 4.090 -999.990 -999.990 1.485 ..P WKT 2011 04 05 21 44 55 31.3200 -97.3300 251.000 30.0 154.485 4.190 -999.990 -999.990 1.545 ..P WKT 2011 04 05 21 49 55 31.3200 -97.3300 251.000 122.0 146.428 3.860 -999.990 -999.990 1.464 ..P WKT 2011 04 05 21 54 55 31.3200 -97.3300 251.000 457.0 152.982 4.660 -999.990 -999.990 1.530 ..P WKT 2011 04 05 21 59 55 31.3200 -97.3300 251.000 30.0 152.895 4.100 -999.990 -999.990 1.529 ..P WKT 2011 04 05 22 04 55 31.3200 -97.3300 251.000 122.0 155.797 3.090 -999.990 -999.990 1.558 ..P WKT 2011 04 05 22 09 55 31.3200 -97.3300 251.000 457.0 152.388 4.700 -999.990 -999.990 1.524 ..P WKT 2011 04 05 22 19 55 31.3200 -97.3300 251.000 30.0 155.914 3.670 -999.990 -999.990 1.559 ..P WKT 2011 04 05 22 24 55 31.3200 -97.3300 251.000 122.0 154.214 3.490 -999.990 -999.990 1.542 ..P WKT 2011 04 05 22 29 55 31.3200 -97.3300 251.000 457.0 145.874 4.000 -999.990 -999.990 1.459 ..P WKT 2011 04 05 22 34 55 31.3200 -97.3300 251.000 30.0 153.138 3.730 -999.990 -999.990 1.531 ..P WKT 2011 04 05 22 39 55 31.3200 -97.3300 251.000 122.0 152.102 3.970 -999.990 -999.990 1.521 ..P WKT 2011 04 05 22 44 55 31.3200 -97.3300 251.000 457.0 148.078 4.250 -999.990 -999.990 1.481 ..P WKT 2011 04 05 22 54 55 31.3200 -97.3300 251.000 30.0 151.983 4.890 -999.990 -999.990 1.520 ..P WKT 2011 04 05 22 59 55 31.3200 -97.3300 251.000 122.0 144.972 4.730 -999.990 -999.990 1.450 ..P WKT 2011 04 05 23 04 55 31.3200 -97.3300 251.000 457.0 152.567 4.850 -999.990 -999.990 1.526 ..P WKT 2011 04 05 23 09 55 31.3200 -97.3300 251.000 30.0 148.876 5.390 -999.990 -999.990 1.489 ..P WKT 2011 04 05 23 14 55 31.3200 -97.3300 251.000 122.0 144.853 4.650 -999.990 -999.990 1.449 ..P WKT 2011 04 05 23 19 55 31.3200 -97.3300 251.000 457.0 148.796 4.780 -999.990 -999.990 1.488 ..P WKT 2011 04 05 23 29 55 31.3200 -97.3300 251.000 30.0 144.491 4.180 -999.990 -999.990 1.445 ..P WKT 2011 04 05 23 34 55 31.3200 -97.3300 251.000 122.0 142.549 4.580 -999.990 -999.990 1.425 ..P WKT 2011 04 05 23 39 55 31.3200 -97.3300 251.000 457.0 142.101 4.490 -999.990 -999.990 1.421 ..P WKT 2011 04 05 23 44 55 31.3200 -97.3300 251.000 30.0 146.465 4.810 -999.990 -999.990 1.465 ..P WKT 2011 04 05 23 49 55 31.3200 -97.3300 251.000 122.0 147.011 3.290 -999.990 -999.990 1.470 ..P WKT 2011 04 06 00 09 55 31.3200 -97.3300 251.000 457.0 155.901 3.090 -999.990 -999.990 1.559 ..P WKT 2011 04 06 00 10 25 31.3200 -97.3300 251.000 457.0 148.616 3.940 -999.990 -999.990 1.486 ..P WKT 2011 04 06 00 10 55 31.3200 -97.3300 251.000 457.0 148.133 3.090 -999.990 -999.990 1.481 ..P WKT 2011 04 06 00 11 25 31.3200 -97.3300 251.000 457.0 147.816 2.990 -999.990 -999.990 1.478 ..P WKT 2011 04 06 00 11 55 31.3200 -97.3300 251.000 457.0 150.653 2.970 -999.990 -999.990 1.507 ..P WKT 2011 04 06 00 12 25 31.3200 -97.3300 251.000 457.0 147.681 3.700 -999.990 -999.990 1.477 ..P WKT 2011 04 06 00 12 55 31.3200 -97.3300 251.000 457.0 143.216 3.500 -999.990 -999.990 1.432 ..P WKT 2011 04 06 00 13 25 31.3200 -97.3300 251.000 457.0 152.523 3.870 -999.990 -999.990 1.525 ..P WKT 2011 04 06 00 13 55 31.3200 -97.3300 251.000 457.0 149.718 4.070 -999.990 -999.990 1.497 ..P WKT 2011 04 06 00 14 25 31.3200 -97.3300 251.000 457.0 146.746 3.450 -999.990 -999.990 1.467 ..P WKT 2011 04 06 00 14 55 31.3200 -97.3300 251.000 457.0 147.093 4.960 -999.990 -999.990 1.471 ..P WKT 2011 04 06 00 19 55 31.3200 -97.3300 251.000 30.0 147.577 3.580 -999.990 -999.990 1.476 ..P WKT 2011 04 06 00 24 55 31.3200 -97.3300 251.000 122.0 150.384 4.080 -999.990 -999.990 1.504 ..P WKT 2011 04 06 00 29 55 31.3200 -97.3300 251.000 457.0 149.872 3.890 -999.990 -999.990 1.499 ..P WKT 2011 04 06 00 34 55 31.3200 -97.3300 251.000 30.0 152.679 3.330 -999.990 -999.990 1.527 ..P WKT 2011 04 06 00 39 55 31.3200 -97.3300 251.000 122.0 152.998 3.990 -999.990 -999.990 1.530 ..P WKT 2011 04 06 00 44 55 31.3200 -97.3300 251.000 457.0 148.173 3.870 -999.990 -999.990 1.482 ..P WKT 2011 04 06 00 54 55 31.3200 -97.3300 251.000 30.0 149.614 3.750 -999.990 -999.990 1.496 ..P WKT 2011 04 06 00 59 55 31.3200 -97.3300 251.000 122.0 148.250 4.290 -999.990 -999.990 1.482 ..P WKT 2011 04 06 01 04 55 31.3200 -97.3300 251.000 457.0 146.056 3.290 -999.990 -999.990 1.461 ..P WKT 2011 04 06 01 09 55 31.3200 -97.3300 251.000 30.0 151.493 3.140 -999.990 -999.990 1.515 ..P WKT 2011 04 06 01 14 55 31.3200 -97.3300 251.000 122.0 151.456 3.540 -999.990 -999.990 1.515 ..P WKT 2011 04 06 01 19 55 31.3200 -97.3300 251.000 457.0 152.745 3.050 -999.990 -999.990 1.527 ..P WKT 2011 04 06 01 29 55 31.3200 -97.3300 251.000 30.0 146.675 2.930 -999.990 -999.990 1.467 ..P WKT 2011 04 06 01 34 55 31.3200 -97.3300 251.000 122.0 147.610 2.900 -999.990 -999.990 1.476 ..P WKT 2011 04 06 01 39 55 31.3200 -97.3300 251.000 457.0 147.383 3.370 -999.990 -999.990 1.474 ..P WKT 2011 04 06 01 44 55 31.3200 -97.3300 251.000 30.0 145.331 3.400 -999.990 -999.990 1.453 ..P WKT 2011 04 06 01 49 55 31.3200 -97.3300 251.000 122.0 144.606 3.130 -999.990 -999.990 1.446 ..P WKT 2011 04 06 01 54 55 31.3200 -97.3300 251.000 457.0 148.195 3.480 -999.990 -999.990 1.482 ..P WKT 2011 04 06 02 04 55 31.3200 -97.3300 251.000 30.0 142.623 3.890 -999.990 -999.990 1.426 ..P WKT 2011 04 06 02 09 55 31.3200 -97.3300 251.000 122.0 145.405 3.100 -999.990 -999.990 1.454 ..P WKT 2011 04 06 02 14 55 31.3200 -97.3300 251.000 457.0 147.855 3.640 -999.990 -999.990 1.479 ..P WKT 2011 04 06 02 19 55 31.3200 -97.3300 251.000 30.0 148.316 6.000 -999.990 -999.990 1.483 ..P WKT 2011 04 06 02 24 55 31.3200 -97.3300 251.000 122.0 146.786 3.940 -999.990 -999.990 1.468 ..P WKT 2011 04 06 02 29 55 31.3200 -97.3300 251.000 457.0 143.929 3.340 -999.990 -999.990 1.439 ..P WKT 2011 04 06 02 39 55 31.3200 -97.3300 251.000 30.0 147.645 3.920 -999.990 -999.990 1.476 ..P WKT 2011 04 06 02 44 55 31.3200 -97.3300 251.000 122.0 141.282 4.100 -999.990 -999.990 1.413 ..P WKT 2011 04 06 02 49 55 31.3200 -97.3300 251.000 457.0 149.844 3.960 -999.990 -999.990 1.498 ..P WKT 2011 04 06 02 54 55 31.3200 -97.3300 251.000 30.0 150.777 3.660 -999.990 -999.990 1.508 ..P WKT 2011 04 06 02 59 55 31.3200 -97.3300 251.000 122.0 148.395 3.720 -999.990 -999.990 1.484 ..P WKT 2011 04 06 03 04 55 31.3200 -97.3300 251.000 457.0 154.634 5.360 -999.990 -999.990 1.546 ..P WKT 2011 04 06 03 14 55 31.3200 -97.3300 251.000 30.0 157.141 3.540 -999.990 -999.990 1.571 ..P WKT 2011 04 06 03 19 55 31.3200 -97.3300 251.000 122.0 148.103 3.450 -999.990 -999.990 1.481 ..P WKT 2011 04 06 03 24 55 31.3200 -97.3300 251.000 457.0 149.014 4.870 -999.990 -999.990 1.490 ..P WKT 2011 04 06 03 29 55 31.3200 -97.3300 251.000 30.0 151.581 4.480 -999.990 -999.990 1.516 ..P WKT 2011 04 06 03 34 55 31.3200 -97.3300 251.000 122.0 155.143 4.280 -999.990 -999.990 1.551 ..P WKT 2011 04 06 03 39 55 31.3200 -97.3300 251.000 457.0 148.427 4.670 -999.990 -999.990 1.484 ..P WKT 2011 04 06 03 49 55 31.3200 -97.3300 251.000 30.0 150.578 3.660 -999.990 -999.990 1.506 ..P WKT 2011 04 06 03 54 55 31.3200 -97.3300 251.000 122.0 152.648 4.870 -999.990 -999.990 1.526 ..P WKT 2011 04 06 03 59 55 31.3200 -97.3300 251.000 457.0 151.072 4.160 -999.990 -999.990 1.511 ..P WKT 2011 04 06 04 04 55 31.3200 -97.3300 251.000 30.0 149.993 3.460 -999.990 -999.990 1.500 ..P WKT 2011 04 06 04 09 55 31.3200 -97.3300 251.000 122.0 154.715 3.190 -999.990 -999.990 1.547 ..P WKT 2011 04 06 04 14 55 31.3200 -97.3300 251.000 457.0 158.110 3.380 -999.990 -999.990 1.581 ..P WKT 2011 04 06 04 24 55 31.3200 -97.3300 251.000 30.0 153.134 3.860 -999.990 -999.990 1.531 ..P WKT 2011 04 06 04 29 55 31.3200 -97.3300 251.000 122.0 154.541 3.160 -999.990 -999.990 1.545 ..P WKT 2011 04 06 04 34 55 31.3200 -97.3300 251.000 457.0 145.176 3.820 -999.990 -999.990 1.452 ..P WKT 2011 04 06 04 39 55 31.3200 -97.3300 251.000 30.0 153.708 4.150 -999.990 -999.990 1.537 ..P WKT 2011 04 06 04 44 55 31.3200 -97.3300 251.000 122.0 155.446 4.100 -999.990 -999.990 1.554 ..P WKT 2011 04 06 04 49 55 31.3200 -97.3300 251.000 457.0 148.567 4.530 -999.990 -999.990 1.486 ..P WKT 2011 04 06 05 04 55 31.3200 -97.3300 251.000 30.0 154.006 3.460 -999.990 -999.990 1.540 ..P WKT 2011 04 06 05 09 55 31.3200 -97.3300 251.000 122.0 156.105 5.310 -999.990 -999.990 1.561 ..P WKT 2011 04 06 05 14 55 31.3200 -97.3300 251.000 457.0 153.067 3.950 -999.990 -999.990 1.531 ..P WKT 2011 04 06 05 19 55 31.3200 -97.3300 251.000 30.0 151.520 4.810 -999.990 -999.990 1.515 ..P WKT 2011 04 06 05 24 55 31.3200 -97.3300 251.000 122.0 147.157 3.660 -999.990 -999.990 1.472 ..P WKT 2011 04 06 05 29 55 31.3200 -97.3300 251.000 457.0 149.588 4.550 -999.990 -999.990 1.496 ..P WKT 2011 04 06 05 39 55 31.3200 -97.3300 251.000 30.0 150.324 3.720 -999.990 -999.990 1.503 ..P WKT 2011 04 06 05 44 55 31.3200 -97.3300 251.000 122.0 154.428 3.390 -999.990 -999.990 1.544 ..P WKT 2011 04 06 05 49 55 31.3200 -97.3300 251.000 457.0 157.538 3.660 -999.990 -999.990 1.575 ..P WKT 2011 04 06 05 54 55 31.3200 -97.3300 251.000 30.0 151.370 3.820 -999.990 -999.990 1.514 ..P WKT 2011 04 06 05 59 55 31.3200 -97.3300 251.000 122.0 157.462 3.480 -999.990 -999.990 1.575 ..P WKT 2011 04 06 06 04 55 31.3200 -97.3300 251.000 457.0 147.651 3.980 -999.990 -999.990 1.477 ..P WKT 2011 04 06 06 14 55 31.3200 -97.3300 251.000 30.0 162.012 3.400 -999.990 -999.990 1.620 ..P WKT 2011 04 06 06 19 55 31.3200 -97.3300 251.000 122.0 162.329 3.950 -999.990 -999.990 1.623 ..P WKT 2011 04 06 06 24 55 31.3200 -97.3300 251.000 457.0 148.071 4.700 -999.990 -999.990 1.481 ..P WKT 2011 04 06 06 29 55 31.3200 -97.3300 251.000 30.0 159.319 4.530 -999.990 -999.990 1.593 ..P WKT 2011 04 06 06 34 55 31.3200 -97.3300 251.000 122.0 162.949 4.340 -999.990 -999.990 1.629 ..P WKT 2011 04 06 06 39 55 31.3200 -97.3300 251.000 457.0 145.048 4.470 -999.990 -999.990 1.450 ..P WKT 2011 04 06 06 49 55 31.3200 -97.3300 251.000 30.0 165.651 3.930 -999.990 -999.990 1.657 ..P WKT 2011 04 06 06 54 55 31.3200 -97.3300 251.000 122.0 165.400 4.500 -999.990 -999.990 1.654 ..P WKT 2011 04 06 06 59 55 31.3200 -97.3300 251.000 457.0 145.609 4.730 -999.990 -999.990 1.456 ..P WKT 2011 04 06 07 04 55 31.3200 -97.3300 251.000 30.0 161.918 4.540 -999.990 -999.990 1.619 ..P WKT 2011 04 06 07 09 55 31.3200 -97.3300 251.000 122.0 163.324 6.470 -999.990 -999.990 1.633 ..P WKT 2011 04 06 07 14 55 31.3200 -97.3300 251.000 457.0 152.476 3.540 -999.990 -999.990 1.525 ..P WKT 2011 04 06 07 24 55 31.3200 -97.3300 251.000 30.0 165.742 3.690 -999.990 -999.990 1.657 ..P WKT 2011 04 06 07 29 55 31.3200 -97.3300 251.000 122.0 167.667 4.430 -999.990 -999.990 1.677 ..P WKT 2011 04 06 07 34 55 31.3200 -97.3300 251.000 457.0 142.936 5.190 -999.990 -999.990 1.429 ..P WKT 2011 04 06 07 39 55 31.3200 -97.3300 251.000 30.0 163.901 4.370 -999.990 -999.990 1.639 ..P WKT 2011 04 06 07 44 55 31.3200 -97.3300 251.000 122.0 170.463 4.210 -999.990 -999.990 1.705 ..P WKT 2011 04 06 07 49 55 31.3200 -97.3300 251.000 457.0 143.580 4.050 -999.990 -999.990 1.436 ..P WKT 2011 04 06 07 59 55 31.3200 -97.3300 251.000 30.0 165.240 4.230 -999.990 -999.990 1.652 ..P WKT 2011 04 06 08 04 55 31.3200 -97.3300 251.000 122.0 168.750 4.180 -999.990 -999.990 1.688 ..P WKT 2011 04 06 08 09 55 31.3200 -97.3300 251.000 457.0 148.256 3.930 -999.990 -999.990 1.483 ..P WKT 2011 04 06 08 14 55 31.3200 -97.3300 251.000 30.0 166.830 4.320 -999.990 -999.990 1.668 ..P WKT 2011 04 06 08 19 55 31.3200 -97.3300 251.000 122.0 170.008 4.060 -999.990 -999.990 1.700 ..P WKT 2011 04 06 08 24 55 31.3200 -97.3300 251.000 457.0 148.522 3.940 -999.990 -999.990 1.485 ..P WKT 2011 04 06 08 34 55 31.3200 -97.3300 251.000 30.0 169.469 3.770 -999.990 -999.990 1.695 ..P WKT 2011 04 06 08 39 55 31.3200 -97.3300 251.000 122.0 167.208 5.510 -999.990 -999.990 1.672 ..P WKT 2011 04 06 08 44 55 31.3200 -97.3300 251.000 457.0 157.996 4.340 -999.990 -999.990 1.580 ..P WKT 2011 04 06 08 49 55 31.3200 -97.3300 251.000 30.0 163.681 3.840 -999.990 -999.990 1.637 ..P WKT 2011 04 06 08 54 55 31.3200 -97.3300 251.000 122.0 164.730 5.090 -999.990 -999.990 1.647 ..P WKT 2011 04 06 08 59 55 31.3200 -97.3300 251.000 457.0 147.244 3.860 -999.990 -999.990 1.472 ..P WKT 2011 04 06 09 09 55 31.3200 -97.3300 251.000 30.0 164.925 4.110 -999.990 -999.990 1.649 ..P WKT 2011 04 06 09 14 55 31.3200 -97.3300 251.000 122.0 167.488 3.760 -999.990 -999.990 1.675 ..P WKT 2011 04 06 09 19 55 31.3200 -97.3300 251.000 457.0 162.107 3.630 -999.990 -999.990 1.621 ..P WKT 2011 04 06 09 24 55 31.3200 -97.3300 251.000 30.0 173.109 4.650 -999.990 -999.990 1.731 ..P WKT 2011 04 06 09 29 55 31.3200 -97.3300 251.000 122.0 169.880 3.930 -999.990 -999.990 1.699 ..P WKT 2011 04 06 09 34 55 31.3200 -97.3300 251.000 457.0 158.378 3.690 -999.990 -999.990 1.584 ..P WKT 2011 04 06 09 44 55 31.3200 -97.3300 251.000 30.0 162.651 3.930 -999.990 -999.990 1.627 ..P WKT 2011 04 06 09 49 55 31.3200 -97.3300 251.000 122.0 161.550 4.490 -999.990 -999.990 1.616 ..P WKT 2011 04 06 09 54 55 31.3200 -97.3300 251.000 457.0 154.493 5.140 -999.990 -999.990 1.545 ..P WKT 2011 04 06 09 59 55 31.3200 -97.3300 251.000 30.0 165.303 4.160 -999.990 -999.990 1.653 ..P WKT 2011 04 06 10 04 55 31.3200 -97.3300 251.000 122.0 162.879 4.170 -999.990 -999.990 1.629 ..P WKT 2011 04 06 10 09 55 31.3200 -97.3300 251.000 457.0 160.785 4.330 -999.990 -999.990 1.608 ..P WKT 2011 04 06 10 19 55 31.3200 -97.3300 251.000 30.0 162.647 4.300 -999.990 -999.990 1.626 ..P WKT 2011 04 06 10 24 55 31.3200 -97.3300 251.000 122.0 162.303 4.410 -999.990 -999.990 1.623 ..P WKT 2011 04 06 10 29 55 31.3200 -97.3300 251.000 457.0 155.672 4.470 -999.990 -999.990 1.557 ..P WKT 2011 04 06 10 34 55 31.3200 -97.3300 251.000 30.0 157.312 4.600 -999.990 -999.990 1.573 ..P WKT 2011 04 06 10 39 55 31.3200 -97.3300 251.000 122.0 165.238 5.540 -999.990 -999.990 1.652 ..P WKT 2011 04 06 10 44 55 31.3200 -97.3300 251.000 457.0 138.097 4.820 -999.990 -999.990 1.381 ..P WKT 2011 04 06 10 54 55 31.3200 -97.3300 251.000 30.0 157.210 4.620 -999.990 -999.990 1.572 ..P WKT 2011 04 06 10 59 55 31.3200 -97.3300 251.000 122.0 160.456 4.580 -999.990 -999.990 1.605 ..P WKT 2011 04 06 11 04 55 31.3200 -97.3300 251.000 457.0 144.186 4.540 -999.990 -999.990 1.442 ..P WKT 2011 04 06 11 09 55 31.3200 -97.3300 251.000 30.0 164.303 5.310 -999.990 -999.990 1.643 ..P WKT 2011 04 06 11 14 55 31.3200 -97.3300 251.000 122.0 168.872 4.830 -999.990 -999.990 1.689 ..P WKT 2011 04 06 11 19 55 31.3200 -97.3300 251.000 457.0 158.226 4.510 -999.990 -999.990 1.582 ..P WKT 2011 04 06 11 29 55 31.3200 -97.3300 251.000 30.0 171.670 4.330 -999.990 -999.990 1.717 ..P WKT 2011 04 06 11 34 55 31.3200 -97.3300 251.000 122.0 169.796 5.050 -999.990 -999.990 1.698 ..P WKT 2011 04 06 11 39 55 31.3200 -97.3300 251.000 457.0 147.581 5.430 -999.990 -999.990 1.476 ..P WKT 2011 04 06 11 44 55 31.3200 -97.3300 251.000 30.0 164.889 5.560 -999.990 -999.990 1.649 ..P WKT 2011 04 06 11 49 55 31.3200 -97.3300 251.000 122.0 162.353 4.570 -999.990 -999.990 1.624 ..P WKT 2011 04 06 12 09 55 31.3200 -97.3300 251.000 457.0 151.565 4.680 -999.990 -999.990 1.516 ..P WKT 2011 04 06 12 10 25 31.3200 -97.3300 251.000 457.0 146.262 4.060 -999.990 -999.990 1.463 ..P WKT 2011 04 06 12 10 55 31.3200 -97.3300 251.000 457.0 148.732 4.200 -999.990 -999.990 1.487 ..P WKT 2011 04 06 12 11 25 31.3200 -97.3300 251.000 457.0 149.880 4.100 -999.990 -999.990 1.499 ..P WKT 2011 04 06 12 11 55 31.3200 -97.3300 251.000 457.0 149.704 4.180 -999.990 -999.990 1.497 ..P WKT 2011 04 06 12 12 25 31.3200 -97.3300 251.000 457.0 151.844 4.460 -999.990 -999.990 1.518 ..P WKT 2011 04 06 12 12 55 31.3200 -97.3300 251.000 457.0 146.707 5.440 -999.990 -999.990 1.467 ..P WKT 2011 04 06 12 13 25 31.3200 -97.3300 251.000 457.0 147.524 5.670 -999.990 -999.990 1.475 ..P WKT 2011 04 06 12 13 55 31.3200 -97.3300 251.000 457.0 152.640 4.120 -999.990 -999.990 1.526 ..P WKT 2011 04 06 12 14 25 31.3200 -97.3300 251.000 457.0 149.819 4.460 -999.990 -999.990 1.498 ..P WKT 2011 04 06 12 14 55 31.3200 -97.3300 251.000 457.0 149.808 4.460 -999.990 -999.990 1.498 ..P WKT 2011 04 06 12 19 55 31.3200 -97.3300 251.000 30.0 169.225 4.800 -999.990 -999.990 1.692 ..P WKT 2011 04 06 12 24 55 31.3200 -97.3300 251.000 122.0 167.800 5.230 -999.990 -999.990 1.678 ..P WKT 2011 04 06 12 29 55 31.3200 -97.3300 251.000 457.0 151.983 4.790 -999.990 -999.990 1.520 ..P WKT 2011 04 06 12 34 55 31.3200 -97.3300 251.000 30.0 167.599 5.030 -999.990 -999.990 1.676 ..P WKT 2011 04 06 12 39 55 31.3200 -97.3300 251.000 122.0 166.837 4.420 -999.990 -999.990 1.668 ..P WKT 2011 04 06 12 44 55 31.3200 -97.3300 251.000 457.0 145.552 4.500 -999.990 -999.990 1.456 ..P WKT 2011 04 06 12 54 55 31.3200 -97.3300 251.000 30.0 169.619 4.330 -999.990 -999.990 1.696 ..P WKT 2011 04 06 12 59 55 31.3200 -97.3300 251.000 122.0 175.584 4.690 -999.990 -999.990 1.756 ..P WKT 2011 04 06 13 04 55 31.3200 -97.3300 251.000 457.0 150.422 5.510 -999.990 -999.990 1.504 ..P WKT 2011 04 06 13 09 55 31.3200 -97.3300 251.000 30.0 174.270 5.750 -999.990 -999.990 1.743 ..P WKT 2011 04 06 13 14 55 31.3200 -97.3300 251.000 122.0 177.919 5.290 -999.990 -999.990 1.779 ..P WKT 2011 04 06 13 19 55 31.3200 -97.3300 251.000 457.0 156.393 4.290 -999.990 -999.990 1.564 ..P WKT 2011 04 06 13 29 55 31.3200 -97.3300 251.000 30.0 180.634 4.470 -999.990 -999.990 1.806 ..P WKT 2011 04 06 13 34 55 31.3200 -97.3300 251.000 122.0 182.509 5.050 -999.990 -999.990 1.825 ..P WKT 2011 04 06 13 39 55 31.3200 -97.3300 251.000 457.0 148.264 7.340 -999.990 -999.990 1.483 ..P WKT 2011 04 06 13 44 55 31.3200 -97.3300 251.000 30.0 175.988 5.430 -999.990 -999.990 1.760 ..P WKT 2011 04 06 13 49 55 31.3200 -97.3300 251.000 122.0 174.548 4.520 -999.990 -999.990 1.745 ..P WKT 2011 04 06 13 54 55 31.3200 -97.3300 251.000 457.0 142.943 3.730 -999.990 -999.990 1.429 ..P WKT 2011 04 06 14 04 55 31.3200 -97.3300 251.000 30.0 169.378 3.800 -999.990 -999.990 1.694 ..P WKT 2011 04 06 14 09 55 31.3200 -97.3300 251.000 122.0 170.401 4.090 -999.990 -999.990 1.704 ..P WKT 2011 04 06 14 14 55 31.3200 -97.3300 251.000 457.0 147.214 4.510 -999.990 -999.990 1.472 ..P WKT 2011 04 06 14 19 55 31.3200 -97.3300 251.000 30.0 174.769 4.450 -999.990 -999.990 1.748 ..P WKT 2011 04 06 14 24 55 31.3200 -97.3300 251.000 122.0 175.794 4.360 -999.990 -999.990 1.758 ..P WKT 2011 04 06 14 29 55 31.3200 -97.3300 251.000 457.0 157.245 3.770 -999.990 -999.990 1.572 ..P WKT 2011 04 06 14 39 55 31.3200 -97.3300 251.000 30.0 168.202 3.640 -999.990 -999.990 1.682 ..P WKT 2011 04 06 14 44 55 31.3200 -97.3300 251.000 122.0 176.810 4.190 -999.990 -999.990 1.768 ..P WKT 2011 04 06 14 49 55 31.3200 -97.3300 251.000 457.0 170.155 4.920 -999.990 -999.990 1.702 ..P WKT 2011 04 06 14 54 55 31.3200 -97.3300 251.000 30.0 176.774 4.500 -999.990 -999.990 1.768 ..P WKT 2011 04 06 14 59 55 31.3200 -97.3300 251.000 122.0 175.760 4.190 -999.990 -999.990 1.758 ..P WKT 2011 04 06 15 04 55 31.3200 -97.3300 251.000 457.0 173.086 4.500 -999.990 -999.990 1.731 ..P WKT 2011 04 06 15 14 55 31.3200 -97.3300 251.000 30.0 181.232 4.580 -999.990 -999.990 1.812 ..P WKT 2011 04 06 15 19 55 31.3200 -97.3300 251.000 122.0 174.454 4.570 -999.990 -999.990 1.745 ..P WKT 2011 04 06 15 24 55 31.3200 -97.3300 251.000 457.0 174.814 4.430 -999.990 -999.990 1.748 ..P WKT 2011 04 06 15 29 55 31.3200 -97.3300 251.000 30.0 171.356 4.320 -999.990 -999.990 1.714 ..P WKT 2011 04 06 15 34 55 31.3200 -97.3300 251.000 122.0 176.866 5.780 -999.990 -999.990 1.769 ..P WKT 2011 04 06 15 39 55 31.3200 -97.3300 251.000 457.0 170.914 4.530 -999.990 -999.990 1.709 ..P WKT 2011 04 06 15 49 55 31.3200 -97.3300 251.000 30.0 169.333 4.670 -999.990 -999.990 1.693 ..P WKT 2011 04 06 15 54 55 31.3200 -97.3300 251.000 122.0 174.372 5.000 -999.990 -999.990 1.744 ..P WKT 2011 04 06 15 59 55 31.3200 -97.3300 251.000 457.0 170.767 4.780 -999.990 -999.990 1.708 ..P WKT 2011 04 06 16 04 55 31.3200 -97.3300 251.000 30.0 170.986 4.550 -999.990 -999.990 1.710 ..P WKT 2011 04 06 16 09 55 31.3200 -97.3300 251.000 122.0 174.530 4.710 -999.990 -999.990 1.745 ..P WKT 2011 04 06 16 14 55 31.3200 -97.3300 251.000 457.0 166.270 5.070 -999.990 -999.990 1.663 ..P WKT 2011 04 06 16 24 55 31.3200 -97.3300 251.000 30.0 172.573 5.030 -999.990 -999.990 1.726 ..P WKT 2011 04 06 16 29 55 31.3200 -97.3300 251.000 122.0 169.014 4.530 -999.990 -999.990 1.690 ..P WKT 2011 04 06 16 34 55 31.3200 -97.3300 251.000 457.0 173.937 6.280 -999.990 -999.990 1.739 ..P WKT 2011 04 06 16 39 55 31.3200 -97.3300 251.000 30.0 172.208 3.840 -999.990 -999.990 1.722 ..P WKT 2011 04 06 16 44 55 31.3200 -97.3300 251.000 122.0 171.975 4.150 -999.990 -999.990 1.720 ..P WKT 2011 04 06 16 49 55 31.3200 -97.3300 251.000 457.0 167.084 3.540 -999.990 -999.990 1.671 ..P WKT 2011 04 06 17 04 55 31.3200 -97.3300 251.000 30.0 163.620 3.770 -999.990 -999.990 1.636 ..P WKT 2011 04 06 17 09 55 31.3200 -97.3300 251.000 122.0 162.753 3.820 -999.990 -999.990 1.628 ..P WKT 2011 04 06 17 14 55 31.3200 -97.3300 251.000 457.0 160.888 4.070 -999.990 -999.990 1.609 ..P WKT 2011 04 06 17 19 55 31.3200 -97.3300 251.000 30.0 157.191 4.640 -999.990 -999.990 1.572 ..P WKT 2011 04 06 17 24 55 31.3200 -97.3300 251.000 122.0 157.322 3.970 -999.990 -999.990 1.573 ..P WKT 2011 04 06 17 29 55 31.3200 -97.3300 251.000 457.0 169.608 4.250 -999.990 -999.990 1.696 ..P WKT 2011 04 06 17 39 55 31.3200 -97.3300 251.000 30.0 161.894 3.750 -999.990 -999.990 1.619 ..P WKT 2011 04 06 17 44 55 31.3200 -97.3300 251.000 122.0 158.210 3.670 -999.990 -999.990 1.582 ..P WKT 2011 04 06 17 49 55 31.3200 -97.3300 251.000 457.0 160.522 3.750 -999.990 -999.990 1.605 ..P WKT 2011 04 06 17 54 55 31.3200 -97.3300 251.000 30.0 159.169 3.890 -999.990 -999.990 1.592 ..P WKT 2011 04 06 17 59 55 31.3200 -97.3300 251.000 122.0 164.147 3.590 -999.990 -999.990 1.641 ..P WKT 2011 04 06 18 04 55 31.3200 -97.3300 251.000 457.0 161.461 3.850 -999.990 -999.990 1.615 ..P WKT 2011 04 06 18 14 55 31.3200 -97.3300 251.000 30.0 157.801 3.760 -999.990 -999.990 1.578 ..P WKT 2011 04 06 18 19 55 31.3200 -97.3300 251.000 122.0 153.828 4.360 -999.990 -999.990 1.538 ..P WKT 2011 04 06 18 24 55 31.3200 -97.3300 251.000 457.0 158.190 3.570 -999.990 -999.990 1.582 ..P WKT 2011 04 06 18 29 55 31.3200 -97.3300 251.000 30.0 156.550 3.920 -999.990 -999.990 1.566 ..P WKT 2011 04 06 18 34 55 31.3200 -97.3300 251.000 122.0 154.243 3.830 -999.990 -999.990 1.542 ..P WKT 2011 04 06 18 39 55 31.3200 -97.3300 251.000 457.0 155.270 4.130 -999.990 -999.990 1.553 ..P WKT 2011 04 06 18 49 55 31.3200 -97.3300 251.000 30.0 157.825 4.680 -999.990 -999.990 1.578 ..P WKT 2011 04 06 18 54 55 31.3200 -97.3300 251.000 122.0 162.024 3.950 -999.990 -999.990 1.620 ..P WKT 2011 04 06 18 59 55 31.3200 -97.3300 251.000 457.0 148.537 4.020 -999.990 -999.990 1.485 ..P WKT 2011 04 06 19 04 55 31.3200 -97.3300 251.000 30.0 154.070 4.530 -999.990 -999.990 1.541 ..P WKT 2011 04 06 19 09 55 31.3200 -97.3300 251.000 122.0 157.601 4.150 -999.990 -999.990 1.576 ..P WKT 2011 04 06 19 14 55 31.3200 -97.3300 251.000 457.0 151.787 4.350 -999.990 -999.990 1.518 ..P WKT 2011 04 06 19 24 55 31.3200 -97.3300 251.000 30.0 147.953 4.030 -999.990 -999.990 1.480 ..P WKT 2011 04 06 19 29 55 31.3200 -97.3300 251.000 122.0 150.436 4.590 -999.990 -999.990 1.504 ..P WKT 2011 04 06 19 34 55 31.3200 -97.3300 251.000 457.0 152.251 4.890 -999.990 -999.990 1.523 ..P WKT 2011 04 06 19 39 55 31.3200 -97.3300 251.000 30.0 154.234 4.890 -999.990 -999.990 1.542 ..P WKT 2011 04 06 19 44 55 31.3200 -97.3300 251.000 122.0 153.879 4.680 -999.990 -999.990 1.539 ..P WKT 2011 04 06 19 49 55 31.3200 -97.3300 251.000 457.0 151.687 3.990 -999.990 -999.990 1.517 ..P WKT 2011 04 06 19 59 55 31.3200 -97.3300 251.000 30.0 152.122 3.890 -999.990 -999.990 1.521 ..P WKT 2011 04 06 20 04 55 31.3200 -97.3300 251.000 122.0 160.598 4.470 -999.990 -999.990 1.606 ..P WKT 2011 04 06 20 09 55 31.3200 -97.3300 251.000 457.0 158.382 5.010 -999.990 -999.990 1.584 ..P WKT 2011 04 06 20 14 55 31.3200 -97.3300 251.000 30.0 159.674 4.970 -999.990 -999.990 1.597 ..P WKT 2011 04 06 20 19 55 31.3200 -97.3300 251.000 122.0 159.463 4.480 -999.990 -999.990 1.595 ..P WKT 2011 04 06 20 24 55 31.3200 -97.3300 251.000 457.0 157.914 3.930 -999.990 -999.990 1.579 ..P WKT 2011 04 06 20 34 55 31.3200 -97.3300 251.000 30.0 149.253 3.660 -999.990 -999.990 1.493 ..P WKT 2011 04 06 20 39 55 31.3200 -97.3300 251.000 122.0 156.683 4.260 -999.990 -999.990 1.567 ..P WKT 2011 04 06 20 44 55 31.3200 -97.3300 251.000 457.0 155.253 5.920 -999.990 -999.990 1.553 ..P WKT 2011 04 06 20 49 55 31.3200 -97.3300 251.000 30.0 153.154 4.660 -999.990 -999.990 1.532 ..P WKT 2011 04 06 20 54 55 31.3200 -97.3300 251.000 122.0 152.894 3.150 -999.990 -999.990 1.529 ..P WKT 2011 04 06 20 59 55 31.3200 -97.3300 251.000 457.0 155.478 3.110 -999.990 -999.990 1.555 ..P WKT 2011 04 06 21 09 55 31.3200 -97.3300 251.000 30.0 161.460 3.870 -999.990 -999.990 1.615 ..P WKT 2011 04 06 21 14 55 31.3200 -97.3300 251.000 122.0 164.022 3.860 -999.990 -999.990 1.640 ..P WKT 2011 04 06 21 19 55 31.3200 -97.3300 251.000 457.0 162.400 3.270 -999.990 -999.990 1.624 ..P WKT 2011 04 06 21 24 55 31.3200 -97.3300 251.000 30.0 164.460 4.500 -999.990 -999.990 1.645 ..P WKT 2011 04 06 21 29 55 31.3200 -97.3300 251.000 122.0 158.821 3.110 -999.990 -999.990 1.588 ..P WKT 2011 04 06 21 34 55 31.3200 -97.3300 251.000 457.0 154.185 3.170 -999.990 -999.990 1.542 ..P WKT 2011 04 06 21 44 55 31.3200 -97.3300 251.000 30.0 159.812 3.630 -999.990 -999.990 1.598 ..P WKT 2011 04 06 21 49 55 31.3200 -97.3300 251.000 122.0 161.706 3.930 -999.990 -999.990 1.617 ..P WKT 2011 04 06 21 54 55 31.3200 -97.3300 251.000 457.0 149.197 3.190 -999.990 -999.990 1.492 ..P WKT 2011 04 06 21 59 55 31.3200 -97.3300 251.000 30.0 156.449 4.360 -999.990 -999.990 1.564 ..P WKT 2011 04 06 22 04 55 31.3200 -97.3300 251.000 122.0 163.704 3.160 -999.990 -999.990 1.637 ..P WKT 2011 04 06 22 09 55 31.3200 -97.3300 251.000 457.0 161.577 4.600 -999.990 -999.990 1.616 ..P WKT 2011 04 06 22 19 55 31.3200 -97.3300 251.000 30.0 159.383 2.930 -999.990 -999.990 1.594 ..P WKT 2011 04 06 22 24 55 31.3200 -97.3300 251.000 122.0 155.963 4.380 -999.990 -999.990 1.560 ..P WKT 2011 04 06 22 29 55 31.3200 -97.3300 251.000 457.0 152.543 3.130 -999.990 -999.990 1.525 ..P WKT 2011 04 06 22 34 55 31.3200 -97.3300 251.000 30.0 153.144 3.340 -999.990 -999.990 1.531 ..P WKT 2011 04 06 22 39 55 31.3200 -97.3300 251.000 122.0 155.758 3.950 -999.990 -999.990 1.558 ..P WKT 2011 04 06 22 44 55 31.3200 -97.3300 251.000 457.0 156.360 3.260 -999.990 -999.990 1.564 ..P WKT 2011 04 06 22 54 55 31.3200 -97.3300 251.000 30.0 153.300 3.410 -999.990 -999.990 1.533 ..P WKT 2011 04 06 22 59 55 31.3200 -97.3300 251.000 122.0 155.339 3.610 -999.990 -999.990 1.553 ..P WKT 2011 04 06 23 04 55 31.3200 -97.3300 251.000 457.0 158.386 4.140 -999.990 -999.990 1.584 ..P WKT 2011 04 06 23 09 55 31.3200 -97.3300 251.000 30.0 152.374 4.570 -999.990 -999.990 1.524 ..P WKT 2011 04 06 23 14 55 31.3200 -97.3300 251.000 122.0 155.420 4.920 -999.990 -999.990 1.554 ..P WKT 2011 04 06 23 19 55 31.3200 -97.3300 251.000 457.0 151.253 3.540 -999.990 -999.990 1.513 ..P WKT 2011 04 06 23 29 55 31.3200 -97.3300 251.000 30.0 142.769 3.640 -999.990 -999.990 1.428 ..P WKT 2011 04 06 23 34 55 31.3200 -97.3300 251.000 122.0 147.851 4.700 -999.990 -999.990 1.479 ..P WKT 2011 04 06 23 39 55 31.3200 -97.3300 251.000 457.0 144.206 4.520 -999.990 -999.990 1.442 ..P WKT 2011 04 06 23 44 55 31.3200 -97.3300 251.000 30.0 149.288 4.840 -999.990 -999.990 1.493 ..P WKT 2011 04 06 23 49 55 31.3200 -97.3300 251.000 122.0 153.701 5.710 -999.990 -999.990 1.537 ..P WKT 2011 04 07 00 09 55 31.3200 -97.3300 251.000 457.0 158.686 3.970 -999.990 -999.990 1.587 ..P WKT 2011 04 07 00 10 25 31.3200 -97.3300 251.000 457.0 159.845 4.430 -999.990 -999.990 1.598 ..P WKT 2011 04 07 00 10 55 31.3200 -97.3300 251.000 457.0 155.465 4.260 -999.990 -999.990 1.555 ..P WKT 2011 04 07 00 11 25 31.3200 -97.3300 251.000 457.0 158.640 3.920 -999.990 -999.990 1.586 ..P WKT 2011 04 07 00 11 55 31.3200 -97.3300 251.000 457.0 158.624 4.110 -999.990 -999.990 1.586 ..P WKT 2011 04 07 00 12 25 31.3200 -97.3300 251.000 457.0 157.768 4.240 -999.990 -999.990 1.578 ..P WKT 2011 04 07 00 12 55 31.3200 -97.3300 251.000 457.0 162.119 3.960 -999.990 -999.990 1.621 ..P WKT 2011 04 07 00 13 25 31.3200 -97.3300 251.000 457.0 161.096 3.670 -999.990 -999.990 1.611 ..P WKT 2011 04 07 00 13 55 31.3200 -97.3300 251.000 457.0 160.744 3.870 -999.990 -999.990 1.607 ..P WKT 2011 04 07 00 14 25 31.3200 -97.3300 251.000 457.0 157.706 3.660 -999.990 -999.990 1.577 ..P WKT 2011 04 07 00 14 55 31.3200 -97.3300 251.000 457.0 159.874 3.990 -999.990 -999.990 1.599 ..P WKT 2011 04 07 00 19 55 31.3200 -97.3300 251.000 30.0 164.754 5.030 -999.990 -999.990 1.648 ..P WKT 2011 04 07 00 24 55 31.3200 -97.3300 251.000 122.0 164.430 3.620 -999.990 -999.990 1.644 ..P WKT 2011 04 07 00 29 55 31.3200 -97.3300 251.000 457.0 161.925 3.560 -999.990 -999.990 1.619 ..P WKT 2011 04 07 00 34 55 31.3200 -97.3300 251.000 30.0 158.245 3.410 -999.990 -999.990 1.582 ..P WKT 2011 04 07 00 39 55 31.3200 -97.3300 251.000 122.0 155.741 4.160 -999.990 -999.990 1.557 ..P WKT 2011 04 07 00 44 55 31.3200 -97.3300 251.000 457.0 157.935 3.620 -999.990 -999.990 1.579 ..P WKT 2011 04 07 00 54 55 31.3200 -97.3300 251.000 30.0 160.434 3.270 -999.990 -999.990 1.604 ..P WKT 2011 04 07 00 59 55 31.3200 -97.3300 251.000 122.0 158.895 4.010 -999.990 -999.990 1.589 ..P WKT 2011 04 07 01 04 55 31.3200 -97.3300 251.000 457.0 154.336 3.430 -999.990 -999.990 1.543 ..P WKT 2011 04 07 01 09 55 31.3200 -97.3300 251.000 30.0 155.144 3.750 -999.990 -999.990 1.551 ..P WKT 2011 04 07 01 14 55 31.3200 -97.3300 251.000 122.0 164.673 2.980 -999.990 -999.990 1.647 ..P WKT 2011 04 07 01 19 55 31.3200 -97.3300 251.000 457.0 157.935 3.400 -999.990 -999.990 1.579 ..P WKT 2011 04 07 01 29 55 31.3200 -97.3300 251.000 30.0 164.557 4.110 -999.990 -999.990 1.646 ..P WKT 2011 04 07 01 34 55 31.3200 -97.3300 251.000 122.0 156.121 3.360 -999.990 -999.990 1.561 ..P WKT 2011 04 07 01 39 55 31.3200 -97.3300 251.000 457.0 156.068 3.060 -999.990 -999.990 1.561 ..P WKT 2011 04 07 01 44 55 31.3200 -97.3300 251.000 30.0 154.003 3.240 -999.990 -999.990 1.540 ..P WKT 2011 04 07 01 49 55 31.3200 -97.3300 251.000 122.0 154.955 3.390 -999.990 -999.990 1.550 ..P WKT 2011 04 07 01 54 55 31.3200 -97.3300 251.000 457.0 157.918 3.210 -999.990 -999.990 1.579 ..P WKT 2011 04 07 02 04 55 31.3200 -97.3300 251.000 30.0 149.816 3.330 -999.990 -999.990 1.498 ..P WKT 2011 04 07 02 09 55 31.3200 -97.3300 251.000 122.0 160.532 3.430 -999.990 -999.990 1.605 ..P WKT 2011 04 07 02 14 55 31.3200 -97.3300 251.000 457.0 161.866 4.150 -999.990 -999.990 1.619 ..P WKT 2011 04 07 02 19 55 31.3200 -97.3300 251.000 30.0 160.185 5.190 -999.990 -999.990 1.602 ..P WKT 2011 04 07 02 24 55 31.3200 -97.3300 251.000 122.0 163.528 4.710 -999.990 -999.990 1.635 ..P WKT 2011 04 07 02 29 55 31.3200 -97.3300 251.000 457.0 162.517 3.800 -999.990 -999.990 1.625 ..P WKT 2011 04 07 02 39 55 31.3200 -97.3300 251.000 30.0 153.223 4.560 -999.990 -999.990 1.532 ..P WKT 2011 04 07 02 44 55 31.3200 -97.3300 251.000 122.0 148.960 4.650 -999.990 -999.990 1.490 ..P WKT 2011 04 07 02 49 55 31.3200 -97.3300 251.000 457.0 150.725 5.090 -999.990 -999.990 1.507 ..P WKT 2011 04 07 02 54 55 31.3200 -97.3300 251.000 30.0 144.119 6.530 -999.990 -999.990 1.441 ..P WKT 2011 04 07 02 59 55 31.3200 -97.3300 251.000 122.0 145.884 5.710 -999.990 -999.990 1.459 ..P WKT 2011 04 07 03 04 55 31.3200 -97.3300 251.000 457.0 148.987 3.960 -999.990 -999.990 1.490 ..P WKT 2011 04 07 03 14 55 31.3200 -97.3300 251.000 30.0 152.300 3.860 -999.990 -999.990 1.523 ..P WKT 2011 04 07 03 19 55 31.3200 -97.3300 251.000 122.0 147.992 5.890 -999.990 -999.990 1.480 ..P WKT 2011 04 07 03 24 55 31.3200 -97.3300 251.000 457.0 147.030 6.550 -999.990 -999.990 1.470 ..P WKT 2011 04 07 03 29 55 31.3200 -97.3300 251.000 30.0 146.571 6.210 -999.990 -999.990 1.466 ..P WKT 2011 04 07 03 34 55 31.3200 -97.3300 251.000 122.0 149.625 3.430 -999.990 -999.990 1.496 ..P WKT 2011 04 07 03 39 55 31.3200 -97.3300 251.000 457.0 152.511 3.160 -999.990 -999.990 1.525 ..P WKT 2011 04 07 03 49 55 31.3200 -97.3300 251.000 30.0 142.204 2.780 -999.990 -999.990 1.422 ..P WKT 2011 04 07 03 54 55 31.3200 -97.3300 251.000 122.0 147.741 3.360 -999.990 -999.990 1.477 ..P WKT 2011 04 07 03 59 55 31.3200 -97.3300 251.000 457.0 152.943 3.670 -999.990 -999.990 1.529 ..P WKT 2011 04 07 04 04 55 31.3200 -97.3300 251.000 30.0 151.289 3.190 -999.990 -999.990 1.513 ..P WKT 2011 04 07 04 09 55 31.3200 -97.3300 251.000 122.0 155.487 2.950 -999.990 -999.990 1.555 ..P WKT 2011 04 07 04 14 55 31.3200 -97.3300 251.000 457.0 151.661 2.860 -999.990 -999.990 1.517 ..P WKT 2011 04 07 04 24 55 31.3200 -97.3300 251.000 30.0 144.058 2.550 -999.990 -999.990 1.441 ..P WKT 2011 04 07 04 29 55 31.3200 -97.3300 251.000 122.0 148.804 3.100 -999.990 -999.990 1.488 ..P WKT 2011 04 07 04 34 55 31.3200 -97.3300 251.000 457.0 141.686 2.890 -999.990 -999.990 1.417 ..P WKT 2011 04 07 04 39 55 31.3200 -97.3300 251.000 30.0 152.947 3.660 -999.990 -999.990 1.529 ..P WKT 2011 04 07 04 44 55 31.3200 -97.3300 251.000 122.0 147.166 2.470 -999.990 -999.990 1.472 ..P WKT 2011 04 07 04 49 55 31.3200 -97.3300 251.000 457.0 149.905 4.140 -999.990 -999.990 1.499 ..P WKT 2011 04 07 05 04 55 31.3200 -97.3300 251.000 30.0 145.661 5.040 -999.990 -999.990 1.457 ..P WKT 2011 04 07 05 09 55 31.3200 -97.3300 251.000 122.0 146.595 2.550 -999.990 -999.990 1.466 ..P WKT 2011 04 07 05 14 55 31.3200 -97.3300 251.000 457.0 146.527 2.360 -999.990 -999.990 1.465 ..P WKT 2011 04 07 05 19 55 31.3200 -97.3300 251.000 30.0 147.962 2.720 -999.990 -999.990 1.480 ..P WKT 2011 04 07 05 24 55 31.3200 -97.3300 251.000 122.0 143.721 2.560 -999.990 -999.990 1.437 ..P WKT 2011 04 07 05 29 55 31.3200 -97.3300 251.000 457.0 143.154 3.380 -999.990 -999.990 1.432 ..P WKT 2011 04 07 05 39 55 31.3200 -97.3300 251.000 30.0 139.386 2.430 -999.990 -999.990 1.394 ..P WKT 2011 04 07 05 44 55 31.3200 -97.3300 251.000 122.0 135.520 2.100 -999.990 -999.990 1.355 ..P WKT 2011 04 07 05 49 55 31.3200 -97.3300 251.000 457.0 140.331 2.800 -999.990 -999.990 1.403 ..P WKT 2011 04 07 05 54 55 31.3200 -97.3300 251.000 30.0 134.797 3.110 -999.990 -999.990 1.348 ..P WKT 2011 04 07 05 59 55 31.3200 -97.3300 251.000 122.0 139.274 2.480 -999.990 -999.990 1.393 ..P WKT 2011 04 07 06 04 55 31.3200 -97.3300 251.000 457.0 138.746 2.070 -999.990 -999.990 1.387 ..P WKT 2011 04 07 06 14 55 31.3200 -97.3300 251.000 30.0 140.452 2.120 -999.990 -999.990 1.405 ..P WKT 2011 04 07 06 19 55 31.3200 -97.3300 251.000 122.0 142.687 2.340 -999.990 -999.990 1.427 ..P WKT 2011 04 07 06 24 55 31.3200 -97.3300 251.000 457.0 135.251 2.210 -999.990 -999.990 1.353 ..P WKT 2011 04 07 06 29 55 31.3200 -97.3300 251.000 30.0 136.486 3.350 -999.990 -999.990 1.365 ..P WKT 2011 04 07 06 34 55 31.3200 -97.3300 251.000 122.0 130.718 3.380 -999.990 -999.990 1.307 ..P WKT 2011 04 07 06 39 55 31.3200 -97.3300 251.000 457.0 136.954 3.910 -999.990 -999.990 1.370 ..P WKT 2011 04 07 06 49 55 31.3200 -97.3300 251.000 30.0 138.945 3.000 -999.990 -999.990 1.389 ..P WKT 2011 04 07 06 54 55 31.3200 -97.3300 251.000 122.0 136.036 2.730 -999.990 -999.990 1.360 ..P WKT 2011 04 07 06 59 55 31.3200 -97.3300 251.000 457.0 138.461 2.720 -999.990 -999.990 1.385 ..P WKT 2011 04 07 07 04 55 31.3200 -97.3300 251.000 30.0 134.553 3.400 -999.990 -999.990 1.346 ..P WKT 2011 04 07 07 09 55 31.3200 -97.3300 251.000 122.0 139.975 4.340 -999.990 -999.990 1.400 ..P WKT 2011 04 07 07 14 55 31.3200 -97.3300 251.000 457.0 138.234 2.880 -999.990 -999.990 1.382 ..P WKT 2011 04 07 07 24 55 31.3200 -97.3300 251.000 30.0 139.106 3.320 -999.990 -999.990 1.391 ..P WKT 2011 04 07 07 29 55 31.3200 -97.3300 251.000 122.0 145.883 3.880 -999.990 -999.990 1.459 ..P WKT 2011 04 07 07 34 55 31.3200 -97.3300 251.000 457.0 143.332 6.130 -999.990 -999.990 1.433 ..P WKT 2011 04 07 07 39 55 31.3200 -97.3300 251.000 30.0 142.947 5.570 -999.990 -999.990 1.429 ..P WKT 2011 04 07 07 44 55 31.3200 -97.3300 251.000 122.0 137.566 4.960 -999.990 -999.990 1.376 ..P WKT 2011 04 07 07 49 55 31.3200 -97.3300 251.000 457.0 150.334 3.370 -999.990 -999.990 1.503 ..P WKT 2011 04 07 07 59 55 31.3200 -97.3300 251.000 30.0 150.158 5.620 -999.990 -999.990 1.502 ..P WKT 2011 04 07 08 04 55 31.3200 -97.3300 251.000 122.0 150.366 5.180 -999.990 -999.990 1.504 ..P WKT 2011 04 07 08 09 55 31.3200 -97.3300 251.000 457.0 145.416 5.500 -999.990 -999.990 1.454 ..P WKT 2011 04 07 08 14 55 31.3200 -97.3300 251.000 30.0 136.638 4.750 -999.990 -999.990 1.366 ..P WKT 2011 04 07 08 19 55 31.3200 -97.3300 251.000 122.0 136.848 4.030 -999.990 -999.990 1.368 ..P WKT 2011 04 07 08 24 55 31.3200 -97.3300 251.000 457.0 139.887 3.000 -999.990 -999.990 1.399 ..P WKT 2011 04 07 08 34 55 31.3200 -97.3300 251.000 30.0 130.990 3.010 -999.990 -999.990 1.310 ..P WKT 2011 04 07 08 39 55 31.3200 -97.3300 251.000 122.0 138.187 3.930 -999.990 -999.990 1.382 ..P WKT 2011 04 07 08 44 55 31.3200 -97.3300 251.000 457.0 131.578 6.100 -999.990 -999.990 1.316 ..P WKT 2011 04 07 08 49 55 31.3200 -97.3300 251.000 30.0 131.289 4.070 -999.990 -999.990 1.313 ..P WKT 2011 04 07 08 54 55 31.3200 -97.3300 251.000 122.0 136.155 3.370 -999.990 -999.990 1.362 ..P WKT 2011 04 07 08 59 55 31.3200 -97.3300 251.000 457.0 135.367 3.090 -999.990 -999.990 1.354 ..P WKT 2011 04 07 09 09 55 31.3200 -97.3300 251.000 30.0 137.117 4.130 -999.990 -999.990 1.371 ..P WKT 2011 04 07 09 14 55 31.3200 -97.3300 251.000 122.0 147.467 2.970 -999.990 -999.990 1.475 ..P WKT 2011 04 07 09 19 55 31.3200 -97.3300 251.000 457.0 142.523 3.430 -999.990 -999.990 1.425 ..P WKT 2011 04 07 09 24 55 31.3200 -97.3300 251.000 30.0 141.568 2.930 -999.990 -999.990 1.416 ..P WKT 2011 04 07 09 29 55 31.3200 -97.3300 251.000 122.0 141.611 3.040 -999.990 -999.990 1.416 ..P WKT 2011 04 07 09 34 55 31.3200 -97.3300 251.000 457.0 139.661 2.640 -999.990 -999.990 1.397 ..P WKT 2011 04 07 09 44 55 31.3200 -97.3300 251.000 30.0 139.225 3.030 -999.990 -999.990 1.392 ..P WKT 2011 04 07 09 49 55 31.3200 -97.3300 251.000 122.0 141.404 3.730 -999.990 -999.990 1.414 ..P WKT 2011 04 07 09 54 55 31.3200 -97.3300 251.000 457.0 138.267 3.060 -999.990 -999.990 1.383 ..P WKT 2011 04 07 09 59 55 31.3200 -97.3300 251.000 30.0 139.117 3.050 -999.990 -999.990 1.391 ..P WKT 2011 04 07 10 04 55 31.3200 -97.3300 251.000 122.0 142.956 3.350 -999.990 -999.990 1.430 ..P WKT 2011 04 07 10 09 55 31.3200 -97.3300 251.000 457.0 141.149 4.100 -999.990 -999.990 1.411 ..P WKT 2011 04 07 10 19 55 31.3200 -97.3300 251.000 30.0 143.891 3.950 -999.990 -999.990 1.439 ..P WKT 2011 04 07 10 24 55 31.3200 -97.3300 251.000 122.0 147.112 3.190 -999.990 -999.990 1.471 ..P WKT 2011 04 07 10 29 55 31.3200 -97.3300 251.000 457.0 140.703 2.710 -999.990 -999.990 1.407 ..P WKT 2011 04 07 10 34 55 31.3200 -97.3300 251.000 30.0 139.277 2.560 -999.990 -999.990 1.393 ..P WKT 2011 04 07 10 39 55 31.3200 -97.3300 251.000 122.0 140.173 2.360 -999.990 -999.990 1.402 ..P WKT 2011 04 07 10 44 55 31.3200 -97.3300 251.000 457.0 143.061 4.090 -999.990 -999.990 1.431 ..P WKT 2011 04 07 10 54 55 31.3200 -97.3300 251.000 30.0 142.080 2.500 -999.990 -999.990 1.421 ..P WKT 2011 04 07 10 59 55 31.3200 -97.3300 251.000 122.0 136.554 3.560 -999.990 -999.990 1.366 ..P WKT 2011 04 07 11 04 55 31.3200 -97.3300 251.000 457.0 142.142 3.830 -999.990 -999.990 1.421 ..P WKT 2011 04 07 11 09 55 31.3200 -97.3300 251.000 30.0 140.266 2.720 -999.990 -999.990 1.403 ..P WKT 2011 04 07 11 14 55 31.3200 -97.3300 251.000 122.0 140.214 2.470 -999.990 -999.990 1.402 ..P WKT 2011 04 07 11 19 55 31.3200 -97.3300 251.000 457.0 140.329 2.150 -999.990 -999.990 1.403 ..P WKT 2011 04 07 11 29 55 31.3200 -97.3300 251.000 30.0 136.894 2.830 -999.990 -999.990 1.369 ..P WKT 2011 04 07 11 34 55 31.3200 -97.3300 251.000 122.0 139.480 2.260 -999.990 -999.990 1.395 ..P WKT 2011 04 07 11 39 55 31.3200 -97.3300 251.000 457.0 141.901 2.700 -999.990 -999.990 1.419 ..P WKT 2011 04 07 11 44 55 31.3200 -97.3300 251.000 30.0 138.353 3.320 -999.990 -999.990 1.384 ..P WKT 2011 04 07 11 49 55 31.3200 -97.3300 251.000 122.0 136.794 3.250 -999.990 -999.990 1.368 ..P WKT 2011 04 07 12 09 55 31.3200 -97.3300 251.000 457.0 140.935 2.260 -999.990 -999.990 1.409 ..P WKT 2011 04 07 12 10 25 31.3200 -97.3300 251.000 457.0 145.667 3.210 -999.990 -999.990 1.457 ..P WKT 2011 04 07 12 10 55 31.3200 -97.3300 251.000 457.0 140.453 2.900 -999.990 -999.990 1.405 ..P WKT 2011 04 07 12 11 25 31.3200 -97.3300 251.000 457.0 140.377 3.860 -999.990 -999.990 1.404 ..P WKT 2011 04 07 12 11 55 31.3200 -97.3300 251.000 457.0 137.981 4.130 -999.990 -999.990 1.380 ..P WKT 2011 04 07 12 12 25 31.3200 -97.3300 251.000 457.0 142.215 2.820 -999.990 -999.990 1.422 ..P WKT 2011 04 07 12 12 55 31.3200 -97.3300 251.000 457.0 143.133 3.650 -999.990 -999.990 1.431 ..P WKT 2011 04 07 12 13 25 31.3200 -97.3300 251.000 457.0 138.748 3.740 -999.990 -999.990 1.387 ..P WKT 2011 04 07 12 13 55 31.3200 -97.3300 251.000 457.0 144.805 2.870 -999.990 -999.990 1.448 ..P WKT 2011 04 07 12 14 25 31.3200 -97.3300 251.000 457.0 142.740 2.670 -999.990 -999.990 1.427 ..P WKT 2011 04 07 12 14 55 31.3200 -97.3300 251.000 457.0 144.488 2.550 -999.990 -999.990 1.445 ..P WKT 2011 04 07 12 19 55 31.3200 -97.3300 251.000 30.0 137.598 3.400 -999.990 -999.990 1.376 ..P WKT 2011 04 07 12 24 55 31.3200 -97.3300 251.000 122.0 144.797 4.250 -999.990 -999.990 1.448 ..P WKT 2011 04 07 12 29 55 31.3200 -97.3300 251.000 457.0 147.024 5.790 -999.990 -999.990 1.470 ..P WKT 2011 04 07 12 34 55 31.3200 -97.3300 251.000 30.0 142.951 4.100 -999.990 -999.990 1.430 ..P WKT 2011 04 07 12 39 55 31.3200 -97.3300 251.000 122.0 139.044 3.750 -999.990 -999.990 1.390 ..P WKT 2011 04 07 12 44 55 31.3200 -97.3300 251.000 457.0 141.768 3.590 -999.990 -999.990 1.418 ..P WKT 2011 04 07 12 54 55 31.3200 -97.3300 251.000 30.0 144.804 5.930 -999.990 -999.990 1.448 ..P WKT 2011 04 07 12 59 55 31.3200 -97.3300 251.000 122.0 147.438 3.900 -999.990 -999.990 1.474 ..P WKT 2011 04 07 13 04 55 31.3200 -97.3300 251.000 457.0 145.593 6.340 -999.990 -999.990 1.456 ..P WKT 2011 04 07 13 09 55 31.3200 -97.3300 251.000 30.0 144.246 4.140 -999.990 -999.990 1.442 ..P WKT 2011 04 07 13 14 55 31.3200 -97.3300 251.000 122.0 136.264 3.030 -999.990 -999.990 1.363 ..P WKT 2011 04 07 13 19 55 31.3200 -97.3300 251.000 457.0 142.878 2.390 -999.990 -999.990 1.429 ..P WKT 2011 04 07 13 29 55 31.3200 -97.3300 251.000 30.0 141.653 2.350 -999.990 -999.990 1.417 ..P WKT 2011 04 07 13 34 55 31.3200 -97.3300 251.000 122.0 143.101 2.880 -999.990 -999.990 1.431 ..P WKT 2011 04 07 13 39 55 31.3200 -97.3300 251.000 457.0 135.592 3.140 -999.990 -999.990 1.356 ..P WKT 2011 04 07 13 44 55 31.3200 -97.3300 251.000 30.0 134.386 2.240 -999.990 -999.990 1.344 ..P WKT 2011 04 07 13 49 55 31.3200 -97.3300 251.000 122.0 150.104 4.300 -999.990 -999.990 1.501 ..P WKT 2011 04 07 13 54 55 31.3200 -97.3300 251.000 457.0 138.943 2.650 -999.990 -999.990 1.389 ..P WKT 2011 04 07 14 04 55 31.3200 -97.3300 251.000 30.0 140.230 2.250 -999.990 -999.990 1.402 ..P WKT 2011 04 07 14 09 55 31.3200 -97.3300 251.000 122.0 137.743 2.570 -999.990 -999.990 1.377 ..P WKT 2011 04 07 14 14 55 31.3200 -97.3300 251.000 457.0 141.231 3.190 -999.990 -999.990 1.412 ..P WKT 2011 04 07 14 19 55 31.3200 -97.3300 251.000 30.0 139.409 2.720 -999.990 -999.990 1.394 ..P WKT 2011 04 07 14 24 55 31.3200 -97.3300 251.000 122.0 135.595 2.650 -999.990 -999.990 1.356 ..P WKT 2011 04 07 14 29 55 31.3200 -97.3300 251.000 457.0 141.407 2.630 -999.990 -999.990 1.414 ..P WKT 2011 04 07 14 39 55 31.3200 -97.3300 251.000 30.0 134.109 2.750 -999.990 -999.990 1.341 ..P WKT 2011 04 07 14 44 55 31.3200 -97.3300 251.000 122.0 137.930 3.620 -999.990 -999.990 1.379 ..P WKT 2011 04 07 14 49 55 31.3200 -97.3300 251.000 457.0 134.115 3.060 -999.990 -999.990 1.341 ..P WKT 2011 04 07 14 54 55 31.3200 -97.3300 251.000 30.0 127.311 3.170 -999.990 -999.990 1.273 ..P WKT 2011 04 07 14 59 55 31.3200 -97.3300 251.000 122.0 131.464 3.570 -999.990 -999.990 1.315 ..P WKT 2011 04 07 15 04 55 31.3200 -97.3300 251.000 457.0 142.757 3.940 -999.990 -999.990 1.428 ..P WKT 2011 04 07 15 14 55 31.3200 -97.3300 251.000 30.0 136.430 2.710 -999.990 -999.990 1.364 ..P WKT 2011 04 07 15 19 55 31.3200 -97.3300 251.000 122.0 140.561 3.070 -999.990 -999.990 1.406 ..P WKT 2011 04 07 15 24 55 31.3200 -97.3300 251.000 457.0 141.537 3.210 -999.990 -999.990 1.415 ..P WKT 2011 04 07 15 29 55 31.3200 -97.3300 251.000 30.0 137.032 3.920 -999.990 -999.990 1.370 ..P WKT 2011 04 07 15 34 55 31.3200 -97.3300 251.000 122.0 143.323 4.070 -999.990 -999.990 1.433 ..P WKT 2011 04 07 15 39 55 31.3200 -97.3300 251.000 457.0 142.305 4.380 -999.990 -999.990 1.423 ..P WKT 2011 04 07 15 49 55 31.3200 -97.3300 251.000 30.0 144.045 2.790 -999.990 -999.990 1.440 ..P WKT 2011 04 07 15 54 55 31.3200 -97.3300 251.000 122.0 145.638 4.170 -999.990 -999.990 1.456 ..P WKT 2011 04 07 15 59 55 31.3200 -97.3300 251.000 457.0 157.364 3.600 -999.990 -999.990 1.574 ..P WKT 2011 04 07 16 04 55 31.3200 -97.3300 251.000 30.0 142.346 4.460 -999.990 -999.990 1.423 ..P WKT 2011 04 07 16 09 55 31.3200 -97.3300 251.000 122.0 156.233 3.800 -999.990 -999.990 1.562 ..P WKT 2011 04 07 16 14 55 31.3200 -97.3300 251.000 457.0 157.993 4.820 -999.990 -999.990 1.580 ..P WKT 2011 04 07 16 24 55 31.3200 -97.3300 251.000 30.0 159.568 3.670 -999.990 -999.990 1.596 ..P WKT 2011 04 07 16 29 55 31.3200 -97.3300 251.000 122.0 158.385 3.820 -999.990 -999.990 1.584 ..P WKT 2011 04 07 16 34 55 31.3200 -97.3300 251.000 457.0 153.878 4.250 -999.990 -999.990 1.539 ..P WKT 2011 04 07 16 39 55 31.3200 -97.3300 251.000 30.0 155.687 4.480 -999.990 -999.990 1.557 ..P WKT 2011 04 07 16 44 55 31.3200 -97.3300 251.000 122.0 151.844 4.190 -999.990 -999.990 1.518 ..P WKT 2011 04 07 16 49 55 31.3200 -97.3300 251.000 457.0 157.807 4.720 -999.990 -999.990 1.578 ..P WKT 2011 04 07 17 04 55 31.3200 -97.3300 251.000 30.0 153.675 5.610 -999.990 -999.990 1.537 ..P WKT 2011 04 07 17 09 55 31.3200 -97.3300 251.000 122.0 156.190 4.450 -999.990 -999.990 1.562 ..P WKT 2011 04 07 17 14 55 31.3200 -97.3300 251.000 457.0 149.396 4.510 -999.990 -999.990 1.494 ..P WKT 2011 04 07 17 19 55 31.3200 -97.3300 251.000 30.0 161.886 4.870 -999.990 -999.990 1.619 ..P WKT 2011 04 07 17 24 55 31.3200 -97.3300 251.000 122.0 156.422 4.860 -999.990 -999.990 1.564 ..P WKT 2011 04 07 17 29 55 31.3200 -97.3300 251.000 457.0 149.959 4.970 -999.990 -999.990 1.500 ..P WKT 2011 04 07 17 39 55 31.3200 -97.3300 251.000 30.0 150.127 5.140 -999.990 -999.990 1.501 ..P WKT 2011 04 07 17 44 55 31.3200 -97.3300 251.000 122.0 157.423 5.300 -999.990 -999.990 1.574 ..P WKT 2011 04 07 17 49 55 31.3200 -97.3300 251.000 457.0 148.424 4.740 -999.990 -999.990 1.484 ..P WKT 2011 04 07 17 54 55 31.3200 -97.3300 251.000 30.0 155.388 4.610 -999.990 -999.990 1.554 ..P WKT 2011 04 07 17 59 55 31.3200 -97.3300 251.000 122.0 150.711 4.560 -999.990 -999.990 1.507 ..P WKT 2011 04 07 18 04 55 31.3200 -97.3300 251.000 457.0 149.361 4.170 -999.990 -999.990 1.494 ..P WKT 2011 04 07 18 14 55 31.3200 -97.3300 251.000 30.0 165.192 4.210 -999.990 -999.990 1.652 ..P WKT 2011 04 07 18 19 55 31.3200 -97.3300 251.000 122.0 161.751 5.490 -999.990 -999.990 1.618 ..P WKT 2011 04 07 18 24 55 31.3200 -97.3300 251.000 457.0 160.971 4.500 -999.990 -999.990 1.610 ..P WKT 2011 04 07 18 29 55 31.3200 -97.3300 251.000 30.0 155.201 4.570 -999.990 -999.990 1.552 ..P WKT 2011 04 07 18 34 55 31.3200 -97.3300 251.000 122.0 158.413 4.950 -999.990 -999.990 1.584 ..P WKT 2011 04 07 18 39 55 31.3200 -97.3300 251.000 457.0 158.299 4.720 -999.990 -999.990 1.583 ..P WKT 2011 04 07 18 49 55 31.3200 -97.3300 251.000 30.0 158.996 4.510 -999.990 -999.990 1.590 ..P WKT 2011 04 07 18 54 55 31.3200 -97.3300 251.000 122.0 163.800 4.420 -999.990 -999.990 1.638 ..P WKT 2011 04 07 18 59 55 31.3200 -97.3300 251.000 457.0 161.618 5.110 -999.990 -999.990 1.616 ..P WKT 2011 04 07 19 04 55 31.3200 -97.3300 251.000 30.0 166.090 5.020 -999.990 -999.990 1.661 ..P WKT 2011 04 07 19 09 55 31.3200 -97.3300 251.000 122.0 164.573 4.020 -999.990 -999.990 1.646 ..P WKT 2011 04 07 19 14 55 31.3200 -97.3300 251.000 457.0 160.394 4.570 -999.990 -999.990 1.604 ..P WKT 2011 04 07 19 24 55 31.3200 -97.3300 251.000 30.0 160.712 4.360 -999.990 -999.990 1.607 ..P WKT 2011 04 07 19 29 55 31.3200 -97.3300 251.000 122.0 158.219 4.910 -999.990 -999.990 1.582 ..P WKT 2011 04 07 19 34 55 31.3200 -97.3300 251.000 457.0 161.219 4.480 -999.990 -999.990 1.612 ..P WKT 2011 04 07 19 39 55 31.3200 -97.3300 251.000 30.0 154.398 4.850 -999.990 -999.990 1.544 ..P WKT 2011 04 07 19 44 55 31.3200 -97.3300 251.000 122.0 154.735 3.980 -999.990 -999.990 1.547 ..P WKT 2011 04 07 19 49 55 31.3200 -97.3300 251.000 457.0 155.571 4.000 -999.990 -999.990 1.556 ..P WKT 2011 04 07 19 59 55 31.3200 -97.3300 251.000 30.0 151.465 4.260 -999.990 -999.990 1.515 ..P WKT 2011 04 07 20 04 55 31.3200 -97.3300 251.000 122.0 154.347 7.150 -999.990 -999.990 1.543 ..P WKT 2011 04 07 20 09 55 31.3200 -97.3300 251.000 457.0 154.064 4.670 -999.990 -999.990 1.541 ..P WKT 2011 04 07 20 14 55 31.3200 -97.3300 251.000 30.0 151.952 6.760 -999.990 -999.990 1.520 ..P WKT 2011 04 07 20 19 55 31.3200 -97.3300 251.000 122.0 157.164 5.230 -999.990 -999.990 1.572 ..P WKT 2011 04 07 20 24 55 31.3200 -97.3300 251.000 457.0 152.887 5.360 -999.990 -999.990 1.529 ..P WKT 2011 04 07 20 34 55 31.3200 -97.3300 251.000 30.0 154.012 5.650 -999.990 -999.990 1.540 ..P WKT 2011 04 07 20 39 55 31.3200 -97.3300 251.000 122.0 161.747 5.510 -999.990 -999.990 1.617 ..P WKT 2011 04 07 20 44 55 31.3200 -97.3300 251.000 457.0 156.328 6.310 -999.990 -999.990 1.563 ..P WKT 2011 04 07 20 49 55 31.3200 -97.3300 251.000 30.0 155.736 5.150 -999.990 -999.990 1.557 ..P WKT 2011 04 07 20 54 55 31.3200 -97.3300 251.000 122.0 153.979 4.970 -999.990 -999.990 1.540 ..P WKT 2011 04 07 20 59 55 31.3200 -97.3300 251.000 457.0 149.558 4.700 -999.990 -999.990 1.496 ..P WKT 2011 04 07 21 09 55 31.3200 -97.3300 251.000 30.0 165.650 4.960 -999.990 -999.990 1.657 ..P WKT 2011 04 07 21 14 55 31.3200 -97.3300 251.000 122.0 159.015 4.610 -999.990 -999.990 1.590 ..P WKT 2011 04 07 21 19 55 31.3200 -97.3300 251.000 457.0 165.706 4.940 -999.990 -999.990 1.657 ..P WKT 2011 04 07 21 24 55 31.3200 -97.3300 251.000 30.0 162.736 6.350 -999.990 -999.990 1.627 ..P WKT 2011 04 07 21 29 55 31.3200 -97.3300 251.000 122.0 164.763 5.150 -999.990 -999.990 1.648 ..P WKT 2011 04 07 21 34 55 31.3200 -97.3300 251.000 457.0 171.788 4.580 -999.990 -999.990 1.718 ..P WKT 2011 04 07 21 44 55 31.3200 -97.3300 251.000 30.0 166.418 5.180 -999.990 -999.990 1.664 ..P WKT 2011 04 07 21 49 55 31.3200 -97.3300 251.000 122.0 172.015 5.210 -999.990 -999.990 1.720 ..P WKT 2011 04 07 21 54 55 31.3200 -97.3300 251.000 457.0 171.282 5.610 -999.990 -999.990 1.713 ..P WKT 2011 04 07 21 59 55 31.3200 -97.3300 251.000 30.0 160.884 5.150 -999.990 -999.990 1.609 ..P WKT 2011 04 07 22 04 55 31.3200 -97.3300 251.000 122.0 169.814 4.960 -999.990 -999.990 1.698 ..P WKT 2011 04 07 22 09 55 31.3200 -97.3300 251.000 457.0 164.082 4.930 -999.990 -999.990 1.641 ..P WKT 2011 04 07 22 19 55 31.3200 -97.3300 251.000 30.0 154.233 5.170 -999.990 -999.990 1.542 ..P WKT 2011 04 07 22 24 55 31.3200 -97.3300 251.000 122.0 161.784 5.580 -999.990 -999.990 1.618 ..P WKT 2011 04 07 22 29 55 31.3200 -97.3300 251.000 457.0 163.003 5.920 -999.990 -999.990 1.630 ..P WKT 2011 04 07 22 34 55 31.3200 -97.3300 251.000 30.0 154.221 4.930 -999.990 -999.990 1.542 ..P WKT 2011 04 07 22 39 55 31.3200 -97.3300 251.000 122.0 157.106 4.680 -999.990 -999.990 1.571 ..P WKT 2011 04 07 22 44 55 31.3200 -97.3300 251.000 457.0 149.990 4.990 -999.990 -999.990 1.500 ..P WKT 2011 04 07 22 54 55 31.3200 -97.3300 251.000 30.0 151.045 4.880 -999.990 -999.990 1.510 ..P WKT 2011 04 07 22 59 55 31.3200 -97.3300 251.000 122.0 150.049 5.650 -999.990 -999.990 1.500 ..P WKT 2011 04 07 23 04 55 31.3200 -97.3300 251.000 457.0 158.554 5.140 -999.990 -999.990 1.586 ..P WKT 2011 04 07 23 09 55 31.3200 -97.3300 251.000 30.0 158.558 5.470 -999.990 -999.990 1.586 ..P WKT 2011 04 07 23 14 55 31.3200 -97.3300 251.000 122.0 152.226 5.130 -999.990 -999.990 1.522 ..P WKT 2011 04 07 23 19 55 31.3200 -97.3300 251.000 457.0 162.567 5.340 -999.990 -999.990 1.626 ..P WKT 2011 04 07 23 29 55 31.3200 -97.3300 251.000 30.0 158.550 5.700 -999.990 -999.990 1.586 ..P WKT 2011 04 07 23 34 55 31.3200 -97.3300 251.000 122.0 151.360 6.390 -999.990 -999.990 1.514 ..P WKT 2011 04 07 23 39 55 31.3200 -97.3300 251.000 457.0 155.009 5.100 -999.990 -999.990 1.550 ..P WKT 2011 04 07 23 44 55 31.3200 -97.3300 251.000 30.0 150.653 4.900 -999.990 -999.990 1.507 ..P WKT 2011 04 07 23 49 55 31.3200 -97.3300 251.000 122.0 152.133 4.900 -999.990 -999.990 1.521 ..P WKT 2011 04 08 00 09 55 31.3200 -97.3300 251.000 457.0 153.215 5.050 -999.990 -999.990 1.532 ..P WKT 2011 04 08 00 10 25 31.3200 -97.3300 251.000 457.0 148.370 5.430 -999.990 -999.990 1.484 ..P WKT 2011 04 08 00 10 55 31.3200 -97.3300 251.000 457.0 150.362 5.370 -999.990 -999.990 1.504 ..P WKT 2011 04 08 00 11 25 31.3200 -97.3300 251.000 457.0 154.355 5.090 -999.990 -999.990 1.544 ..P WKT 2011 04 08 00 11 55 31.3200 -97.3300 251.000 457.0 152.677 5.350 -999.990 -999.990 1.527 ..P WKT 2011 04 08 00 12 25 31.3200 -97.3300 251.000 457.0 150.834 4.990 -999.990 -999.990 1.508 ..P WKT 2011 04 08 00 12 55 31.3200 -97.3300 251.000 457.0 155.327 5.500 -999.990 -999.990 1.553 ..P WKT 2011 04 08 00 13 25 31.3200 -97.3300 251.000 457.0 152.982 6.100 -999.990 -999.990 1.530 ..P WKT 2011 04 08 00 13 55 31.3200 -97.3300 251.000 457.0 149.971 5.360 -999.990 -999.990 1.500 ..P WKT 2011 04 08 00 14 25 31.3200 -97.3300 251.000 457.0 149.461 5.360 -999.990 -999.990 1.495 ..P WKT 2011 04 08 00 14 55 31.3200 -97.3300 251.000 457.0 152.453 5.310 -999.990 -999.990 1.525 ..P WKT 2011 04 08 00 19 55 31.3200 -97.3300 251.000 30.0 147.355 5.080 -999.990 -999.990 1.474 ..P WKT 2011 04 08 00 24 55 31.3200 -97.3300 251.000 122.0 147.260 5.030 -999.990 -999.990 1.473 ..P WKT 2011 04 08 00 29 55 31.3200 -97.3300 251.000 457.0 146.499 5.050 -999.990 -999.990 1.465 ..P WKT 2011 04 08 00 34 55 31.3200 -97.3300 251.000 30.0 148.571 5.030 -999.990 -999.990 1.486 ..P WKT 2011 04 08 00 39 55 31.3200 -97.3300 251.000 122.0 146.975 6.750 -999.990 -999.990 1.470 ..P WKT 2011 04 08 00 44 55 31.3200 -97.3300 251.000 457.0 152.218 5.430 -999.990 -999.990 1.522 ..P WKT 2011 04 08 00 54 55 31.3200 -97.3300 251.000 30.0 149.041 5.800 -999.990 -999.990 1.490 ..P WKT 2011 04 08 00 59 55 31.3200 -97.3300 251.000 122.0 149.296 4.760 -999.990 -999.990 1.493 ..P WKT 2011 04 08 01 04 55 31.3200 -97.3300 251.000 457.0 153.553 5.650 -999.990 -999.990 1.536 ..P WKT 2011 04 08 01 09 55 31.3200 -97.3300 251.000 30.0 151.806 5.630 -999.990 -999.990 1.518 ..P WKT 2011 04 08 01 14 55 31.3200 -97.3300 251.000 122.0 153.729 5.520 -999.990 -999.990 1.537 ..P WKT 2011 04 08 01 19 55 31.3200 -97.3300 251.000 457.0 155.985 4.720 -999.990 -999.990 1.560 ..P WKT 2011 04 08 01 29 55 31.3200 -97.3300 251.000 30.0 150.204 7.410 -999.990 -999.990 1.502 ..P WKT 2011 04 08 01 34 55 31.3200 -97.3300 251.000 122.0 143.833 5.010 -999.990 -999.990 1.438 ..P WKT 2011 04 08 01 39 55 31.3200 -97.3300 251.000 457.0 142.133 5.740 -999.990 -999.990 1.421 ..P WKT 2011 04 08 01 44 55 31.3200 -97.3300 251.000 30.0 149.775 6.160 -999.990 -999.990 1.498 ..P WKT 2011 04 08 01 49 55 31.3200 -97.3300 251.000 122.0 144.072 6.190 -999.990 -999.990 1.441 ..P WKT 2011 04 08 01 54 55 31.3200 -97.3300 251.000 457.0 139.369 6.090 -999.990 -999.990 1.394 ..P WKT 2011 04 08 02 04 55 31.3200 -97.3300 251.000 30.0 148.554 5.610 -999.990 -999.990 1.486 ..P WKT 2011 04 08 02 09 55 31.3200 -97.3300 251.000 122.0 156.768 5.850 -999.990 -999.990 1.568 ..P WKT 2011 04 08 02 14 55 31.3200 -97.3300 251.000 457.0 151.637 6.100 -999.990 -999.990 1.516 ..P WKT 2011 04 08 02 19 55 31.3200 -97.3300 251.000 30.0 145.504 6.530 -999.990 -999.990 1.455 ..P WKT 2011 04 08 02 24 55 31.3200 -97.3300 251.000 122.0 154.386 6.000 -999.990 -999.990 1.544 ..P WKT 2011 04 08 02 29 55 31.3200 -97.3300 251.000 457.0 153.259 5.240 -999.990 -999.990 1.533 ..P WKT 2011 04 08 02 39 55 31.3200 -97.3300 251.000 30.0 154.913 5.390 -999.990 -999.990 1.549 ..P WKT 2011 04 08 02 44 55 31.3200 -97.3300 251.000 122.0 150.686 5.870 -999.990 -999.990 1.507 ..P WKT 2011 04 08 02 49 55 31.3200 -97.3300 251.000 457.0 149.796 6.580 -999.990 -999.990 1.498 ..P WKT 2011 04 08 02 54 55 31.3200 -97.3300 251.000 30.0 143.734 5.770 -999.990 -999.990 1.437 ..P WKT 2011 04 08 02 59 55 31.3200 -97.3300 251.000 122.0 150.020 6.720 -999.990 -999.990 1.500 ..P WKT 2011 04 08 03 04 55 31.3200 -97.3300 251.000 457.0 148.796 4.750 -999.990 -999.990 1.488 ..P WKT 2011 04 08 03 14 55 31.3200 -97.3300 251.000 30.0 151.260 4.930 -999.990 -999.990 1.513 ..P WKT 2011 04 08 03 19 55 31.3200 -97.3300 251.000 122.0 158.786 5.840 -999.990 -999.990 1.588 ..P WKT 2011 04 08 03 24 55 31.3200 -97.3300 251.000 457.0 152.628 5.990 -999.990 -999.990 1.526 ..P WKT 2011 04 08 03 29 55 31.3200 -97.3300 251.000 30.0 149.974 5.070 -999.990 -999.990 1.500 ..P WKT 2011 04 08 03 34 55 31.3200 -97.3300 251.000 122.0 150.992 4.570 -999.990 -999.990 1.510 ..P WKT 2011 04 08 03 39 55 31.3200 -97.3300 251.000 457.0 148.839 5.120 -999.990 -999.990 1.488 ..P WKT 2011 04 08 03 49 55 31.3200 -97.3300 251.000 30.0 156.524 5.380 -999.990 -999.990 1.565 ..P WKT 2011 04 08 03 54 55 31.3200 -97.3300 251.000 122.0 152.846 4.530 -999.990 -999.990 1.528 ..P WKT 2011 04 08 03 59 55 31.3200 -97.3300 251.000 457.0 151.503 4.660 -999.990 -999.990 1.515 ..P WKT 2011 04 08 04 04 55 31.3200 -97.3300 251.000 30.0 153.999 4.990 -999.990 -999.990 1.540 ..P WKT 2011 04 08 04 09 55 31.3200 -97.3300 251.000 122.0 153.491 4.440 -999.990 -999.990 1.535 ..P WKT 2011 04 08 04 14 55 31.3200 -97.3300 251.000 457.0 154.818 4.880 -999.990 -999.990 1.548 ..P WKT 2011 04 08 04 24 55 31.3200 -97.3300 251.000 30.0 148.914 4.360 -999.990 -999.990 1.489 ..P WKT 2011 04 08 04 29 55 31.3200 -97.3300 251.000 122.0 145.854 4.880 -999.990 -999.990 1.459 ..P WKT 2011 04 08 04 34 55 31.3200 -97.3300 251.000 457.0 155.480 4.770 -999.990 -999.990 1.555 ..P WKT 2011 04 08 04 39 55 31.3200 -97.3300 251.000 30.0 149.249 4.750 -999.990 -999.990 1.492 ..P WKT 2011 04 08 04 44 55 31.3200 -97.3300 251.000 122.0 150.361 4.860 -999.990 -999.990 1.504 ..P WKT 2011 04 08 04 49 55 31.3200 -97.3300 251.000 457.0 151.809 5.070 -999.990 -999.990 1.518 ..P WKT 2011 04 08 05 04 55 31.3200 -97.3300 251.000 30.0 150.868 4.950 -999.990 -999.990 1.509 ..P WKT 2011 04 08 05 09 55 31.3200 -97.3300 251.000 122.0 148.673 5.750 -999.990 -999.990 1.487 ..P WKT 2011 04 08 05 14 55 31.3200 -97.3300 251.000 457.0 157.161 5.430 -999.990 -999.990 1.572 ..P WKT 2011 04 08 05 19 55 31.3200 -97.3300 251.000 30.0 148.287 5.790 -999.990 -999.990 1.483 ..P WKT 2011 04 08 05 24 55 31.3200 -97.3300 251.000 122.0 148.429 5.570 -999.990 -999.990 1.484 ..P WKT 2011 04 08 05 29 55 31.3200 -97.3300 251.000 457.0 152.578 4.460 -999.990 -999.990 1.526 ..P WKT 2011 04 08 05 39 55 31.3200 -97.3300 251.000 30.0 148.443 4.540 -999.990 -999.990 1.484 ..P WKT 2011 04 08 05 44 55 31.3200 -97.3300 251.000 122.0 146.169 5.280 -999.990 -999.990 1.462 ..P WKT 2011 04 08 05 49 55 31.3200 -97.3300 251.000 457.0 153.912 6.070 -999.990 -999.990 1.539 ..P WKT 2011 04 08 05 54 55 31.3200 -97.3300 251.000 30.0 149.969 4.850 -999.990 -999.990 1.500 ..P WKT 2011 04 08 05 59 55 31.3200 -97.3300 251.000 122.0 150.034 4.800 -999.990 -999.990 1.500 ..P WKT 2011 04 08 06 04 55 31.3200 -97.3300 251.000 457.0 159.113 5.040 -999.990 -999.990 1.591 ..P WKT 2011 04 08 06 14 55 31.3200 -97.3300 251.000 30.0 156.689 4.400 -999.990 -999.990 1.567 ..P WKT 2011 04 08 06 19 55 31.3200 -97.3300 251.000 122.0 161.882 4.600 -999.990 -999.990 1.619 ..P WKT 2011 04 08 06 24 55 31.3200 -97.3300 251.000 457.0 154.050 4.900 -999.990 -999.990 1.541 ..P WKT 2011 04 08 06 29 55 31.3200 -97.3300 251.000 30.0 153.232 4.320 -999.990 -999.990 1.532 ..P WKT 2011 04 08 06 34 55 31.3200 -97.3300 251.000 122.0 157.757 4.160 -999.990 -999.990 1.578 ..P WKT 2011 04 08 06 39 55 31.3200 -97.3300 251.000 457.0 160.278 4.690 -999.990 -999.990 1.603 ..P WKT 2011 04 08 06 49 55 31.3200 -97.3300 251.000 30.0 154.276 4.260 -999.990 -999.990 1.543 ..P WKT 2011 04 08 06 54 55 31.3200 -97.3300 251.000 122.0 157.107 4.430 -999.990 -999.990 1.571 ..P WKT 2011 04 08 06 59 55 31.3200 -97.3300 251.000 457.0 148.750 4.600 -999.990 -999.990 1.488 ..P WKT 2011 04 08 07 04 55 31.3200 -97.3300 251.000 30.0 156.591 4.650 -999.990 -999.990 1.566 ..P WKT 2011 04 08 07 09 55 31.3200 -97.3300 251.000 122.0 159.422 4.650 -999.990 -999.990 1.594 ..P WKT 2011 04 08 07 14 55 31.3200 -97.3300 251.000 457.0 146.389 5.350 -999.990 -999.990 1.464 ..P WKT 2011 04 08 07 24 55 31.3200 -97.3300 251.000 30.0 151.504 5.720 -999.990 -999.990 1.515 ..P WKT 2011 04 08 07 29 55 31.3200 -97.3300 251.000 122.0 154.120 4.760 -999.990 -999.990 1.541 ..P WKT 2011 04 08 07 34 55 31.3200 -97.3300 251.000 457.0 150.725 4.140 -999.990 -999.990 1.507 ..P WKT 2011 04 08 07 39 55 31.3200 -97.3300 251.000 30.0 152.673 4.580 -999.990 -999.990 1.527 ..P WKT 2011 04 08 07 44 55 31.3200 -97.3300 251.000 122.0 152.284 4.540 -999.990 -999.990 1.523 ..P WKT 2011 04 08 07 49 55 31.3200 -97.3300 251.000 457.0 152.563 5.060 -999.990 -999.990 1.526 ..P WKT 2011 04 08 07 59 55 31.3200 -97.3300 251.000 30.0 156.365 3.940 -999.990 -999.990 1.564 ..P WKT 2011 04 08 08 04 55 31.3200 -97.3300 251.000 122.0 152.540 4.990 -999.990 -999.990 1.525 ..P WKT 2011 04 08 08 09 55 31.3200 -97.3300 251.000 457.0 160.239 4.270 -999.990 -999.990 1.602 ..P WKT 2011 04 08 08 14 55 31.3200 -97.3300 251.000 30.0 149.900 3.990 -999.990 -999.990 1.499 ..P WKT 2011 04 08 08 19 55 31.3200 -97.3300 251.000 122.0 151.754 4.530 -999.990 -999.990 1.518 ..P WKT 2011 04 08 08 24 55 31.3200 -97.3300 251.000 457.0 154.108 5.080 -999.990 -999.990 1.541 ..P WKT 2011 04 08 08 34 55 31.3200 -97.3300 251.000 30.0 149.416 4.520 -999.990 -999.990 1.494 ..P WKT 2011 04 08 08 39 55 31.3200 -97.3300 251.000 122.0 152.058 4.550 -999.990 -999.990 1.521 ..P WKT 2011 04 08 08 44 55 31.3200 -97.3300 251.000 457.0 150.857 3.860 -999.990 -999.990 1.509 ..P WKT 2011 04 08 08 49 55 31.3200 -97.3300 251.000 30.0 149.990 4.370 -999.990 -999.990 1.500 ..P WKT 2011 04 08 08 54 55 31.3200 -97.3300 251.000 122.0 153.133 3.970 -999.990 -999.990 1.531 ..P WKT 2011 04 08 08 59 55 31.3200 -97.3300 251.000 457.0 154.270 4.100 -999.990 -999.990 1.543 ..P WKT 2011 04 08 09 09 55 31.3200 -97.3300 251.000 30.0 156.166 4.300 -999.990 -999.990 1.562 ..P WKT 2011 04 08 09 14 55 31.3200 -97.3300 251.000 122.0 154.920 3.880 -999.990 -999.990 1.549 ..P WKT 2011 04 08 09 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 09 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 09 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 09 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 09 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 19 58 25 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 20 06 25 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 20 06 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 20 07 25 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 20 07 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 20 13 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 20 14 25 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 20 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 20 19 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 20 24 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 20 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 20 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 20 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 20 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 20 54 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 20 59 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 21 08 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 21 09 25 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 21 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 21 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 21 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 21 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 21 29 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 21 34 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 21 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 21 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 21 54 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 21 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 22 04 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 22 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 22 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 22 24 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 22 29 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 22 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 22 39 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 22 44 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 22 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 22 59 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 23 04 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 23 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 23 14 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 23 19 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 23 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 23 34 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 23 39 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 08 23 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 08 23 49 55 31.3200 -97.3300 251.000 122.0 -999.999 -999.990 -999.990 -999.990 -10.000 Z.P WKT 2011 04 09 00 09 55 31.3200 -97.3300 251.000 457.0 129.372 4.690 -999.990 -999.990 1.294 ..P WKT 2011 04 09 00 10 25 31.3200 -97.3300 251.000 457.0 131.753 4.900 -999.990 -999.990 1.318 ..P WKT 2011 04 09 00 10 55 31.3200 -97.3300 251.000 457.0 134.635 5.220 -999.990 -999.990 1.346 ..P WKT 2011 04 09 00 11 25 31.3200 -97.3300 251.000 457.0 130.488 5.750 -999.990 -999.990 1.305 ..P WKT 2011 04 09 00 11 55 31.3200 -97.3300 251.000 457.0 129.018 6.170 -999.990 -999.990 1.290 ..P WKT 2011 04 09 00 12 25 31.3200 -97.3300 251.000 457.0 135.918 6.180 -999.990 -999.990 1.359 ..P WKT 2011 04 09 00 12 55 31.3200 -97.3300 251.000 457.0 132.440 6.380 -999.990 -999.990 1.324 ..P WKT 2011 04 09 00 13 25 31.3200 -97.3300 251.000 457.0 133.649 6.790 -999.990 -999.990 1.336 ..P WKT 2011 04 09 00 13 55 31.3200 -97.3300 251.000 457.0 130.338 7.250 -999.990 -999.990 1.303 ..P WKT 2011 04 09 00 14 25 31.3200 -97.3300 251.000 457.0 137.908 7.290 -999.990 -999.990 1.379 ..P WKT 2011 04 09 00 14 55 31.3200 -97.3300 251.000 457.0 142.799 7.600 -999.990 -999.990 1.428 ..P WKT 2011 04 09 00 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 00 24 55 31.3200 -97.3300 251.000 122.0 137.516 10.740 -999.990 -999.990 1.375 ..P WKT 2011 04 09 00 29 55 31.3200 -97.3300 251.000 457.0 135.376 8.500 -999.990 -999.990 1.354 ..P WKT 2011 04 09 00 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 00 39 55 31.3200 -97.3300 251.000 122.0 132.939 4.690 -999.990 -999.990 1.329 ..P WKT 2011 04 09 00 44 55 31.3200 -97.3300 251.000 457.0 133.144 2.980 -999.990 -999.990 1.331 ..P WKT 2011 04 09 00 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 00 59 55 31.3200 -97.3300 251.000 122.0 136.942 2.200 -999.990 -999.990 1.369 ..P WKT 2011 04 09 01 04 55 31.3200 -97.3300 251.000 457.0 132.215 2.490 -999.990 -999.990 1.322 ..P WKT 2011 04 09 01 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 01 14 55 31.3200 -97.3300 251.000 122.0 137.314 3.230 -999.990 -999.990 1.373 ..P WKT 2011 04 09 01 19 55 31.3200 -97.3300 251.000 457.0 133.089 2.900 -999.990 -999.990 1.331 ..P WKT 2011 04 09 01 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 01 34 55 31.3200 -97.3300 251.000 122.0 131.264 3.070 -999.990 -999.990 1.313 ..P WKT 2011 04 09 01 39 55 31.3200 -97.3300 251.000 457.0 125.271 3.190 -999.990 -999.990 1.253 ..P WKT 2011 04 09 01 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 01 49 55 31.3200 -97.3300 251.000 122.0 127.337 4.380 -999.990 -999.990 1.273 ..P WKT 2011 04 09 01 54 55 31.3200 -97.3300 251.000 457.0 129.539 3.280 -999.990 -999.990 1.295 ..P WKT 2011 04 09 02 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 02 09 55 31.3200 -97.3300 251.000 122.0 137.341 3.250 -999.990 -999.990 1.373 ..P WKT 2011 04 09 02 14 55 31.3200 -97.3300 251.000 457.0 139.806 4.130 -999.990 -999.990 1.398 ..P WKT 2011 04 09 02 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 02 24 55 31.3200 -97.3300 251.000 122.0 144.734 4.910 -999.990 -999.990 1.447 ..P WKT 2011 04 09 02 29 55 31.3200 -97.3300 251.000 457.0 138.171 3.310 -999.990 -999.990 1.382 ..P WKT 2011 04 09 02 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 02 44 55 31.3200 -97.3300 251.000 122.0 133.719 3.980 -999.990 -999.990 1.337 ..P WKT 2011 04 09 02 49 55 31.3200 -97.3300 251.000 457.0 126.919 5.730 -999.990 -999.990 1.269 ..P WKT 2011 04 09 02 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 02 59 55 31.3200 -97.3300 251.000 122.0 125.354 5.770 -999.990 -999.990 1.254 ..P WKT 2011 04 09 03 04 55 31.3200 -97.3300 251.000 457.0 127.913 3.710 -999.990 -999.990 1.279 ..P WKT 2011 04 09 03 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 03 19 55 31.3200 -97.3300 251.000 122.0 132.822 5.500 -999.990 -999.990 1.328 ..P WKT 2011 04 09 03 24 55 31.3200 -97.3300 251.000 457.0 142.016 8.050 -999.990 -999.990 1.420 ..P WKT 2011 04 09 03 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 03 34 55 31.3200 -97.3300 251.000 122.0 142.025 5.840 -999.990 -999.990 1.420 ..P WKT 2011 04 09 03 39 55 31.3200 -97.3300 251.000 457.0 155.394 3.960 -999.990 -999.990 1.554 ..P WKT 2011 04 09 03 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 03 54 55 31.3200 -97.3300 251.000 122.0 146.289 5.380 -999.990 -999.990 1.463 ..P WKT 2011 04 09 03 59 55 31.3200 -97.3300 251.000 457.0 154.932 5.970 -999.990 -999.990 1.549 ..P WKT 2011 04 09 04 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 04 09 55 31.3200 -97.3300 251.000 122.0 148.163 3.440 -999.990 -999.990 1.482 ..P WKT 2011 04 09 04 14 55 31.3200 -97.3300 251.000 457.0 157.472 4.470 -999.990 -999.990 1.575 ..P WKT 2011 04 09 04 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 04 29 55 31.3200 -97.3300 251.000 122.0 156.505 3.520 -999.990 -999.990 1.565 ..P WKT 2011 04 09 04 34 55 31.3200 -97.3300 251.000 457.0 157.128 4.210 -999.990 -999.990 1.571 ..P WKT 2011 04 09 04 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 04 44 55 31.3200 -97.3300 251.000 122.0 154.703 3.100 -999.990 -999.990 1.547 ..P WKT 2011 04 09 04 49 55 31.3200 -97.3300 251.000 457.0 166.846 3.170 -999.990 -999.990 1.668 ..P WKT 2011 04 09 05 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 05 09 55 31.3200 -97.3300 251.000 122.0 164.215 4.480 -999.990 -999.990 1.642 ..P WKT 2011 04 09 05 14 55 31.3200 -97.3300 251.000 457.0 180.321 4.070 -999.990 -999.990 1.803 ..P WKT 2011 04 09 05 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 05 24 55 31.3200 -97.3300 251.000 122.0 172.477 5.720 -999.990 -999.990 1.725 ..P WKT 2011 04 09 05 29 55 31.3200 -97.3300 251.000 457.0 191.251 4.970 -999.990 -999.990 1.913 ..P WKT 2011 04 09 05 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 05 44 55 31.3200 -97.3300 251.000 122.0 184.329 4.060 -999.990 -999.990 1.843 ..P WKT 2011 04 09 05 49 55 31.3200 -97.3300 251.000 457.0 200.516 3.880 -999.990 -999.990 2.005 ..P WKT 2011 04 09 05 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 05 59 55 31.3200 -97.3300 251.000 122.0 184.837 3.240 -999.990 -999.990 1.848 ..P WKT 2011 04 09 06 04 55 31.3200 -97.3300 251.000 457.0 211.364 3.300 -999.990 -999.990 2.114 ..P WKT 2011 04 09 06 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 06 19 55 31.3200 -97.3300 251.000 122.0 184.369 3.990 -999.990 -999.990 1.844 ..P WKT 2011 04 09 06 24 55 31.3200 -97.3300 251.000 457.0 231.336 3.680 -999.990 -999.990 2.313 ..P WKT 2011 04 09 06 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 06 34 55 31.3200 -97.3300 251.000 122.0 174.489 2.900 -999.990 -999.990 1.745 ..P WKT 2011 04 09 06 39 55 31.3200 -97.3300 251.000 457.0 229.121 3.870 -999.990 -999.990 2.291 ..P WKT 2011 04 09 06 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 06 54 55 31.3200 -97.3300 251.000 122.0 166.305 2.690 -999.990 -999.990 1.663 ..P WKT 2011 04 09 06 59 55 31.3200 -97.3300 251.000 457.0 173.288 3.000 -999.990 -999.990 1.733 ..P WKT 2011 04 09 07 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 07 09 55 31.3200 -97.3300 251.000 122.0 168.578 3.820 -999.990 -999.990 1.686 ..P WKT 2011 04 09 07 14 55 31.3200 -97.3300 251.000 457.0 167.890 2.580 -999.990 -999.990 1.679 ..P WKT 2011 04 09 07 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 07 29 55 31.3200 -97.3300 251.000 122.0 169.351 3.730 -999.990 -999.990 1.694 ..P WKT 2011 04 09 07 34 55 31.3200 -97.3300 251.000 457.0 129.256 3.250 -999.990 -999.990 1.293 ..P WKT 2011 04 09 07 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 07 44 55 31.3200 -97.3300 251.000 122.0 160.575 3.640 -999.990 -999.990 1.606 ..P WKT 2011 04 09 07 49 55 31.3200 -97.3300 251.000 457.0 126.985 3.540 -999.990 -999.990 1.270 ..P WKT 2011 04 09 07 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 08 04 55 31.3200 -97.3300 251.000 122.0 154.352 3.980 -999.990 -999.990 1.544 ..P WKT 2011 04 09 08 09 55 31.3200 -97.3300 251.000 457.0 114.342 3.610 -999.990 -999.990 1.143 ..P WKT 2011 04 09 08 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 08 19 55 31.3200 -97.3300 251.000 122.0 151.959 4.040 -999.990 -999.990 1.520 ..P WKT 2011 04 09 08 24 55 31.3200 -97.3300 251.000 457.0 102.292 4.200 -999.990 -999.990 1.023 ..P WKT 2011 04 09 08 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 08 39 55 31.3200 -97.3300 251.000 122.0 138.625 4.900 -999.990 -999.990 1.386 ..P WKT 2011 04 09 08 44 55 31.3200 -97.3300 251.000 457.0 103.245 3.480 -999.990 -999.990 1.032 ..P WKT 2011 04 09 08 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 08 54 55 31.3200 -97.3300 251.000 122.0 130.096 4.440 -999.990 -999.990 1.301 ..P WKT 2011 04 09 08 59 55 31.3200 -97.3300 251.000 457.0 105.881 3.120 -999.990 -999.990 1.059 ..P WKT 2011 04 09 09 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 09 14 55 31.3200 -97.3300 251.000 122.0 131.686 3.600 -999.990 -999.990 1.317 ..P WKT 2011 04 09 09 19 55 31.3200 -97.3300 251.000 457.0 106.072 2.440 -999.990 -999.990 1.061 ..P WKT 2011 04 09 09 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 09 29 55 31.3200 -97.3300 251.000 122.0 132.604 2.960 -999.990 -999.990 1.326 ..P WKT 2011 04 09 09 34 55 31.3200 -97.3300 251.000 457.0 104.164 4.860 -999.990 -999.990 1.042 ..P WKT 2011 04 09 09 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 09 49 55 31.3200 -97.3300 251.000 122.0 118.879 3.900 -999.990 -999.990 1.189 ..P WKT 2011 04 09 09 54 55 31.3200 -97.3300 251.000 457.0 111.821 3.760 -999.990 -999.990 1.118 ..P WKT 2011 04 09 09 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 10 04 55 31.3200 -97.3300 251.000 122.0 124.007 3.260 -999.990 -999.990 1.240 ..P WKT 2011 04 09 10 09 55 31.3200 -97.3300 251.000 457.0 105.301 2.600 -999.990 -999.990 1.053 ..P WKT 2011 04 09 10 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 10 24 55 31.3200 -97.3300 251.000 122.0 117.515 3.160 -999.990 -999.990 1.175 ..P WKT 2011 04 09 10 29 55 31.3200 -97.3300 251.000 457.0 112.171 4.780 -999.990 -999.990 1.122 ..P WKT 2011 04 09 10 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 10 39 55 31.3200 -97.3300 251.000 122.0 116.462 5.550 -999.990 -999.990 1.165 ..P WKT 2011 04 09 10 44 55 31.3200 -97.3300 251.000 457.0 115.445 4.000 -999.990 -999.990 1.154 ..P WKT 2011 04 09 10 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 10 59 55 31.3200 -97.3300 251.000 122.0 113.537 5.490 -999.990 -999.990 1.135 ..P WKT 2011 04 09 11 04 55 31.3200 -97.3300 251.000 457.0 112.758 5.990 -999.990 -999.990 1.128 ..P WKT 2011 04 09 11 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 11 14 55 31.3200 -97.3300 251.000 122.0 111.534 7.120 -999.990 -999.990 1.115 ..P WKT 2011 04 09 11 19 55 31.3200 -97.3300 251.000 457.0 103.771 4.360 -999.990 -999.990 1.038 ..P WKT 2011 04 09 11 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 11 34 55 31.3200 -97.3300 251.000 122.0 109.942 5.970 -999.990 -999.990 1.099 ..P WKT 2011 04 09 11 39 55 31.3200 -97.3300 251.000 457.0 101.611 7.370 -999.990 -999.990 1.016 ..P WKT 2011 04 09 11 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 11 49 55 31.3200 -97.3300 251.000 122.0 109.390 5.500 -999.990 -999.990 1.094 ..P WKT 2011 04 09 12 09 55 31.3200 -97.3300 251.000 457.0 115.989 3.620 -999.990 -999.990 1.160 ..P WKT 2011 04 09 12 10 25 31.3200 -97.3300 251.000 457.0 113.472 3.490 -999.990 -999.990 1.135 ..P WKT 2011 04 09 12 10 55 31.3200 -97.3300 251.000 457.0 114.279 3.380 -999.990 -999.990 1.143 ..P WKT 2011 04 09 12 11 25 31.3200 -97.3300 251.000 457.0 114.090 3.640 -999.990 -999.990 1.141 ..P WKT 2011 04 09 12 11 55 31.3200 -97.3300 251.000 457.0 111.074 3.520 -999.990 -999.990 1.111 ..P WKT 2011 04 09 12 12 25 31.3200 -97.3300 251.000 457.0 115.206 3.380 -999.990 -999.990 1.152 ..P WKT 2011 04 09 12 12 55 31.3200 -97.3300 251.000 457.0 114.850 4.170 -999.990 -999.990 1.149 ..P WKT 2011 04 09 12 13 25 31.3200 -97.3300 251.000 457.0 113.497 4.190 -999.990 -999.990 1.135 ..P WKT 2011 04 09 12 13 55 31.3200 -97.3300 251.000 457.0 115.634 3.620 -999.990 -999.990 1.156 ..P WKT 2011 04 09 12 14 25 31.3200 -97.3300 251.000 457.0 114.447 3.840 -999.990 -999.990 1.144 ..P WKT 2011 04 09 12 14 55 31.3200 -97.3300 251.000 457.0 110.766 3.870 -999.990 -999.990 1.108 ..P WKT 2011 04 09 12 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 12 24 55 31.3200 -97.3300 251.000 122.0 110.461 4.780 -999.990 -999.990 1.105 ..P WKT 2011 04 09 12 29 55 31.3200 -97.3300 251.000 457.0 111.555 4.490 -999.990 -999.990 1.116 ..P WKT 2011 04 09 12 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 12 39 55 31.3200 -97.3300 251.000 122.0 115.075 2.900 -999.990 -999.990 1.151 ..P WKT 2011 04 09 12 44 55 31.3200 -97.3300 251.000 457.0 115.338 2.590 -999.990 -999.990 1.153 ..P WKT 2011 04 09 12 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 12 59 55 31.3200 -97.3300 251.000 122.0 113.105 3.360 -999.990 -999.990 1.131 ..P WKT 2011 04 09 13 04 55 31.3200 -97.3300 251.000 457.0 115.433 3.500 -999.990 -999.990 1.154 ..P WKT 2011 04 09 13 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 13 14 55 31.3200 -97.3300 251.000 122.0 111.440 5.370 -999.990 -999.990 1.114 ..P WKT 2011 04 09 13 19 55 31.3200 -97.3300 251.000 457.0 116.928 4.680 -999.990 -999.990 1.169 ..P WKT 2011 04 09 13 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 13 34 55 31.3200 -97.3300 251.000 122.0 114.313 3.480 -999.990 -999.990 1.143 ..P WKT 2011 04 09 13 39 55 31.3200 -97.3300 251.000 457.0 112.007 3.230 -999.990 -999.990 1.120 ..P WKT 2011 04 09 13 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 13 49 55 31.3200 -97.3300 251.000 122.0 112.052 2.960 -999.990 -999.990 1.121 ..P WKT 2011 04 09 13 54 55 31.3200 -97.3300 251.000 457.0 111.078 2.330 -999.990 -999.990 1.111 ..P WKT 2011 04 09 14 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 14 09 55 31.3200 -97.3300 251.000 122.0 113.714 2.370 -999.990 -999.990 1.137 ..P WKT 2011 04 09 14 14 55 31.3200 -97.3300 251.000 457.0 130.995 3.590 -999.990 -999.990 1.310 ..P WKT 2011 04 09 14 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 14 24 55 31.3200 -97.3300 251.000 122.0 114.972 2.930 -999.990 -999.990 1.150 ..P WKT 2011 04 09 14 29 55 31.3200 -97.3300 251.000 457.0 124.933 3.710 -999.990 -999.990 1.249 ..P WKT 2011 04 09 14 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 14 44 55 31.3200 -97.3300 251.000 122.0 112.022 3.100 -999.990 -999.990 1.120 ..P WKT 2011 04 09 14 49 55 31.3200 -97.3300 251.000 457.0 125.217 4.390 -999.990 -999.990 1.252 ..P WKT 2011 04 09 14 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 14 59 55 31.3200 -97.3300 251.000 122.0 117.988 2.020 -999.990 -999.990 1.180 ..P WKT 2011 04 09 15 04 55 31.3200 -97.3300 251.000 457.0 121.531 2.550 -999.990 -999.990 1.215 ..P WKT 2011 04 09 15 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 15 19 55 31.3200 -97.3300 251.000 122.0 120.935 2.590 -999.990 -999.990 1.209 ..P WKT 2011 04 09 15 24 55 31.3200 -97.3300 251.000 457.0 126.524 4.030 -999.990 -999.990 1.265 ..P WKT 2011 04 09 15 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 15 34 55 31.3200 -97.3300 251.000 122.0 123.218 4.570 -999.990 -999.990 1.232 ..P WKT 2011 04 09 15 39 55 31.3200 -97.3300 251.000 457.0 118.650 4.790 -999.990 -999.990 1.187 ..P WKT 2011 04 09 15 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 15 54 55 31.3200 -97.3300 251.000 122.0 122.360 4.960 -999.990 -999.990 1.224 ..P WKT 2011 04 09 15 59 55 31.3200 -97.3300 251.000 457.0 122.668 5.220 -999.990 -999.990 1.227 ..P WKT 2011 04 09 16 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 16 09 55 31.3200 -97.3300 251.000 122.0 123.286 4.230 -999.990 -999.990 1.233 ..P WKT 2011 04 09 16 14 55 31.3200 -97.3300 251.000 457.0 119.598 2.790 -999.990 -999.990 1.196 ..P WKT 2011 04 09 16 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 16 29 55 31.3200 -97.3300 251.000 122.0 122.499 4.410 -999.990 -999.990 1.225 ..P WKT 2011 04 09 16 34 55 31.3200 -97.3300 251.000 457.0 115.551 4.900 -999.990 -999.990 1.156 ..P WKT 2011 04 09 16 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 16 44 55 31.3200 -97.3300 251.000 122.0 121.142 3.740 -999.990 -999.990 1.211 ..P WKT 2011 04 09 16 49 55 31.3200 -97.3300 251.000 457.0 117.691 3.340 -999.990 -999.990 1.177 ..P WKT 2011 04 09 17 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 17 09 55 31.3200 -97.3300 251.000 122.0 121.869 3.420 -999.990 -999.990 1.219 ..P WKT 2011 04 09 17 14 55 31.3200 -97.3300 251.000 457.0 119.415 4.420 -999.990 -999.990 1.194 ..P WKT 2011 04 09 17 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 17 24 55 31.3200 -97.3300 251.000 122.0 123.668 4.330 -999.990 -999.990 1.237 ..P WKT 2011 04 09 17 29 55 31.3200 -97.3300 251.000 457.0 118.714 3.340 -999.990 -999.990 1.187 ..P WKT 2011 04 09 17 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 17 44 55 31.3200 -97.3300 251.000 122.0 123.805 3.300 -999.990 -999.990 1.238 ..P WKT 2011 04 09 17 49 55 31.3200 -97.3300 251.000 457.0 111.829 3.590 -999.990 -999.990 1.118 ..P WKT 2011 04 09 17 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 17 59 55 31.3200 -97.3300 251.000 122.0 123.541 3.850 -999.990 -999.990 1.235 ..P WKT 2011 04 09 18 04 55 31.3200 -97.3300 251.000 457.0 116.566 2.550 -999.990 -999.990 1.166 ..P WKT 2011 04 09 18 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 18 19 55 31.3200 -97.3300 251.000 122.0 132.970 3.170 -999.990 -999.990 1.330 ..P WKT 2011 04 09 18 24 55 31.3200 -97.3300 251.000 457.0 125.660 3.460 -999.990 -999.990 1.257 ..P WKT 2011 04 09 18 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 18 34 55 31.3200 -97.3300 251.000 122.0 130.708 3.620 -999.990 -999.990 1.307 ..P WKT 2011 04 09 18 39 55 31.3200 -97.3300 251.000 457.0 128.732 2.640 -999.990 -999.990 1.287 ..P WKT 2011 04 09 18 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 18 54 55 31.3200 -97.3300 251.000 122.0 130.231 3.600 -999.990 -999.990 1.302 ..P WKT 2011 04 09 18 59 55 31.3200 -97.3300 251.000 457.0 125.468 4.120 -999.990 -999.990 1.255 ..P WKT 2011 04 09 19 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 19 09 55 31.3200 -97.3300 251.000 122.0 126.944 4.440 -999.990 -999.990 1.269 ..P WKT 2011 04 09 19 14 55 31.3200 -97.3300 251.000 457.0 128.683 3.380 -999.990 -999.990 1.287 ..P WKT 2011 04 09 19 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 19 29 55 31.3200 -97.3300 251.000 122.0 125.061 5.800 -999.990 -999.990 1.251 ..P WKT 2011 04 09 19 34 55 31.3200 -97.3300 251.000 457.0 127.967 5.110 -999.990 -999.990 1.280 ..P WKT 2011 04 09 19 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 19 44 55 31.3200 -97.3300 251.000 122.0 126.944 4.340 -999.990 -999.990 1.269 ..P WKT 2011 04 09 19 49 55 31.3200 -97.3300 251.000 457.0 129.683 2.590 -999.990 -999.990 1.297 ..P WKT 2011 04 09 19 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 20 04 55 31.3200 -97.3300 251.000 122.0 130.922 3.890 -999.990 -999.990 1.309 ..P WKT 2011 04 09 20 09 55 31.3200 -97.3300 251.000 457.0 125.084 4.280 -999.990 -999.990 1.251 ..P WKT 2011 04 09 20 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 20 19 55 31.3200 -97.3300 251.000 122.0 128.253 3.550 -999.990 -999.990 1.283 ..P WKT 2011 04 09 20 24 55 31.3200 -97.3300 251.000 457.0 125.917 2.710 -999.990 -999.990 1.259 ..P WKT 2011 04 09 20 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 20 39 55 31.3200 -97.3300 251.000 122.0 126.918 3.010 -999.990 -999.990 1.269 ..P WKT 2011 04 09 20 44 55 31.3200 -97.3300 251.000 457.0 124.415 2.490 -999.990 -999.990 1.244 ..P WKT 2011 04 09 20 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 20 54 55 31.3200 -97.3300 251.000 122.0 123.414 4.540 -999.990 -999.990 1.234 ..P WKT 2011 04 09 20 59 55 31.3200 -97.3300 251.000 457.0 121.912 2.710 -999.990 -999.990 1.219 ..P WKT 2011 04 09 21 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 21 14 55 31.3200 -97.3300 251.000 122.0 126.893 3.730 -999.990 -999.990 1.269 ..P WKT 2011 04 09 21 19 55 31.3200 -97.3300 251.000 457.0 130.302 2.890 -999.990 -999.990 1.303 ..P WKT 2011 04 09 21 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 21 29 55 31.3200 -97.3300 251.000 122.0 133.782 3.080 -999.990 -999.990 1.338 ..P WKT 2011 04 09 21 34 55 31.3200 -97.3300 251.000 457.0 133.353 2.480 -999.990 -999.990 1.334 ..P WKT 2011 04 09 21 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 21 49 55 31.3200 -97.3300 251.000 122.0 136.453 2.870 -999.990 -999.990 1.365 ..P WKT 2011 04 09 21 54 55 31.3200 -97.3300 251.000 457.0 127.035 3.800 -999.990 -999.990 1.270 ..P WKT 2011 04 09 21 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 22 04 55 31.3200 -97.3300 251.000 122.0 138.242 2.600 -999.990 -999.990 1.382 ..P WKT 2011 04 09 22 09 55 31.3200 -97.3300 251.000 457.0 133.497 3.140 -999.990 -999.990 1.335 ..P WKT 2011 04 09 22 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 22 24 55 31.3200 -97.3300 251.000 122.0 137.289 3.630 -999.990 -999.990 1.373 ..P WKT 2011 04 09 22 29 55 31.3200 -97.3300 251.000 457.0 132.878 2.740 -999.990 -999.990 1.329 ..P WKT 2011 04 09 22 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 22 39 55 31.3200 -97.3300 251.000 122.0 127.058 2.880 -999.990 -999.990 1.271 ..P WKT 2011 04 09 22 44 55 31.3200 -97.3300 251.000 457.0 126.318 3.760 -999.990 -999.990 1.263 ..P WKT 2011 04 09 22 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 22 59 55 31.3200 -97.3300 251.000 122.0 131.399 2.800 -999.990 -999.990 1.314 ..P WKT 2011 04 09 23 04 55 31.3200 -97.3300 251.000 457.0 127.129 2.830 -999.990 -999.990 1.271 ..P WKT 2011 04 09 23 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 23 14 55 31.3200 -97.3300 251.000 122.0 135.622 2.240 -999.990 -999.990 1.356 ..P WKT 2011 04 09 23 19 55 31.3200 -97.3300 251.000 457.0 132.521 3.210 -999.990 -999.990 1.325 ..P WKT 2011 04 09 23 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 23 34 55 31.3200 -97.3300 251.000 122.0 126.502 2.230 -999.990 -999.990 1.265 ..P WKT 2011 04 09 23 39 55 31.3200 -97.3300 251.000 457.0 124.125 3.060 -999.990 -999.990 1.241 ..P WKT 2011 04 09 23 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 09 23 49 55 31.3200 -97.3300 251.000 122.0 119.537 4.110 -999.990 -999.990 1.195 ..P WKT 2011 04 10 00 09 55 31.3200 -97.3300 251.000 457.0 125.782 3.330 -999.990 -999.990 1.258 ..P WKT 2011 04 10 00 10 25 31.3200 -97.3300 251.000 457.0 125.641 3.350 -999.990 -999.990 1.256 ..P WKT 2011 04 10 00 10 55 31.3200 -97.3300 251.000 457.0 125.333 4.170 -999.990 -999.990 1.253 ..P WKT 2011 04 10 00 11 25 31.3200 -97.3300 251.000 457.0 131.705 2.760 -999.990 -999.990 1.317 ..P WKT 2011 04 10 00 11 55 31.3200 -97.3300 251.000 457.0 132.065 3.070 -999.990 -999.990 1.321 ..P WKT 2011 04 10 00 12 25 31.3200 -97.3300 251.000 457.0 129.251 2.770 -999.990 -999.990 1.293 ..P WKT 2011 04 10 00 12 55 31.3200 -97.3300 251.000 457.0 126.604 2.900 -999.990 -999.990 1.266 ..P WKT 2011 04 10 00 13 25 31.3200 -97.3300 251.000 457.0 125.963 3.170 -999.990 -999.990 1.260 ..P WKT 2011 04 10 00 13 55 31.3200 -97.3300 251.000 457.0 123.148 3.000 -999.990 -999.990 1.231 ..P WKT 2011 04 10 00 14 25 31.3200 -97.3300 251.000 457.0 123.509 4.280 -999.990 -999.990 1.235 ..P WKT 2011 04 10 00 14 55 31.3200 -97.3300 251.000 457.0 130.549 2.900 -999.990 -999.990 1.305 ..P WKT 2011 04 10 00 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 00 24 55 31.3200 -97.3300 251.000 122.0 128.058 3.200 -999.990 -999.990 1.281 ..P WKT 2011 04 10 00 29 55 31.3200 -97.3300 251.000 457.0 127.647 4.150 -999.990 -999.990 1.276 ..P WKT 2011 04 10 00 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 00 39 55 31.3200 -97.3300 251.000 122.0 133.672 2.320 -999.990 -999.990 1.337 ..P WKT 2011 04 10 00 44 55 31.3200 -97.3300 251.000 457.0 128.920 3.540 -999.990 -999.990 1.289 ..P WKT 2011 04 10 00 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 00 59 55 31.3200 -97.3300 251.000 122.0 129.684 4.100 -999.990 -999.990 1.297 ..P WKT 2011 04 10 01 04 55 31.3200 -97.3300 251.000 457.0 133.360 2.220 -999.990 -999.990 1.334 ..P WKT 2011 04 10 01 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 01 14 55 31.3200 -97.3300 251.000 122.0 132.530 2.270 -999.990 -999.990 1.325 ..P WKT 2011 04 10 01 19 55 31.3200 -97.3300 251.000 457.0 133.034 1.940 -999.990 -999.990 1.330 ..P WKT 2011 04 10 01 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 01 34 55 31.3200 -97.3300 251.000 122.0 133.924 2.030 -999.990 -999.990 1.339 ..P WKT 2011 04 10 01 39 55 31.3200 -97.3300 251.000 457.0 143.629 2.820 -999.990 -999.990 1.436 ..P WKT 2011 04 10 01 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 01 49 55 31.3200 -97.3300 251.000 122.0 142.346 3.450 -999.990 -999.990 1.423 ..P WKT 2011 04 10 01 54 55 31.3200 -97.3300 251.000 457.0 147.377 2.410 -999.990 -999.990 1.474 ..P WKT 2011 04 10 02 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 02 09 55 31.3200 -97.3300 251.000 122.0 153.222 2.650 -999.990 -999.990 1.532 ..P WKT 2011 04 10 02 14 55 31.3200 -97.3300 251.000 457.0 144.954 2.920 -999.990 -999.990 1.450 ..P WKT 2011 04 10 02 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 02 24 55 31.3200 -97.3300 251.000 122.0 153.107 2.710 -999.990 -999.990 1.531 ..P WKT 2011 04 10 02 29 55 31.3200 -97.3300 251.000 457.0 158.852 1.880 -999.990 -999.990 1.589 ..P WKT 2011 04 10 02 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 02 44 55 31.3200 -97.3300 251.000 122.0 150.732 2.930 -999.990 -999.990 1.507 ..P WKT 2011 04 10 02 49 55 31.3200 -97.3300 251.000 457.0 153.807 2.320 -999.990 -999.990 1.538 ..P WKT 2011 04 10 02 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 02 59 55 31.3200 -97.3300 251.000 122.0 158.288 3.360 -999.990 -999.990 1.583 ..P WKT 2011 04 10 03 04 55 31.3200 -97.3300 251.000 457.0 163.029 2.650 -999.990 -999.990 1.630 ..P WKT 2011 04 10 03 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 03 19 55 31.3200 -97.3300 251.000 122.0 157.745 4.010 -999.990 -999.990 1.577 ..P WKT 2011 04 10 03 24 55 31.3200 -97.3300 251.000 457.0 156.151 4.000 -999.990 -999.990 1.562 ..P WKT 2011 04 10 03 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 03 34 55 31.3200 -97.3300 251.000 122.0 144.631 3.960 -999.990 -999.990 1.446 ..P WKT 2011 04 10 03 39 55 31.3200 -97.3300 251.000 457.0 149.703 4.080 -999.990 -999.990 1.497 ..P WKT 2011 04 10 03 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 03 54 55 31.3200 -97.3300 251.000 122.0 149.876 4.080 -999.990 -999.990 1.499 ..P WKT 2011 04 10 03 59 55 31.3200 -97.3300 251.000 457.0 147.593 2.620 -999.990 -999.990 1.476 ..P WKT 2011 04 10 04 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 04 09 55 31.3200 -97.3300 251.000 122.0 146.525 2.710 -999.990 -999.990 1.465 ..P WKT 2011 04 10 04 14 55 31.3200 -97.3300 251.000 457.0 148.575 3.080 -999.990 -999.990 1.486 ..P WKT 2011 04 10 04 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 04 29 55 31.3200 -97.3300 251.000 122.0 147.510 2.940 -999.990 -999.990 1.475 ..P WKT 2011 04 10 04 34 55 31.3200 -97.3300 251.000 457.0 152.699 3.230 -999.990 -999.990 1.527 ..P WKT 2011 04 10 04 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 04 44 55 31.3200 -97.3300 251.000 122.0 147.420 3.480 -999.990 -999.990 1.474 ..P WKT 2011 04 10 04 49 55 31.3200 -97.3300 251.000 457.0 152.609 3.250 -999.990 -999.990 1.526 ..P WKT 2011 04 10 05 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 05 09 55 31.3200 -97.3300 251.000 122.0 144.762 2.830 -999.990 -999.990 1.448 ..P WKT 2011 04 10 05 14 55 31.3200 -97.3300 251.000 457.0 151.629 2.990 -999.990 -999.990 1.516 ..P WKT 2011 04 10 05 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 05 24 55 31.3200 -97.3300 251.000 122.0 140.057 4.820 -999.990 -999.990 1.401 ..P WKT 2011 04 10 05 29 55 31.3200 -97.3300 251.000 457.0 153.914 2.550 -999.990 -999.990 1.539 ..P WKT 2011 04 10 05 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 05 44 55 31.3200 -97.3300 251.000 122.0 134.294 1.970 -999.990 -999.990 1.343 ..P WKT 2011 04 10 05 49 55 31.3200 -97.3300 251.000 457.0 154.673 2.420 -999.990 -999.990 1.547 ..P WKT 2011 04 10 05 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 05 59 55 31.3200 -97.3300 251.000 122.0 138.177 2.940 -999.990 -999.990 1.382 ..P WKT 2011 04 10 06 04 55 31.3200 -97.3300 251.000 457.0 139.250 2.460 -999.990 -999.990 1.393 ..P WKT 2011 04 10 06 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 06 19 55 31.3200 -97.3300 251.000 122.0 139.993 3.060 -999.990 -999.990 1.400 ..P WKT 2011 04 10 06 24 55 31.3200 -97.3300 251.000 457.0 135.171 2.920 -999.990 -999.990 1.352 ..P WKT 2011 04 10 06 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 06 34 55 31.3200 -97.3300 251.000 122.0 130.851 3.110 -999.990 -999.990 1.309 ..P WKT 2011 04 10 06 39 55 31.3200 -97.3300 251.000 457.0 137.674 3.640 -999.990 -999.990 1.377 ..P WKT 2011 04 10 06 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 06 54 55 31.3200 -97.3300 251.000 122.0 131.100 3.230 -999.990 -999.990 1.311 ..P WKT 2011 04 10 06 59 55 31.3200 -97.3300 251.000 457.0 136.876 3.160 -999.990 -999.990 1.369 ..P WKT 2011 04 10 07 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 07 09 55 31.3200 -97.3300 251.000 122.0 132.297 3.800 -999.990 -999.990 1.323 ..P WKT 2011 04 10 07 14 55 31.3200 -97.3300 251.000 457.0 139.402 4.220 -999.990 -999.990 1.394 ..P WKT 2011 04 10 07 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 07 29 55 31.3200 -97.3300 251.000 122.0 129.434 2.880 -999.990 -999.990 1.294 ..P WKT 2011 04 10 07 34 55 31.3200 -97.3300 251.000 457.0 136.775 3.430 -999.990 -999.990 1.368 ..P WKT 2011 04 10 07 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 07 44 55 31.3200 -97.3300 251.000 122.0 139.986 3.690 -999.990 -999.990 1.400 ..P WKT 2011 04 10 07 49 55 31.3200 -97.3300 251.000 457.0 133.530 3.050 -999.990 -999.990 1.335 ..P WKT 2011 04 10 07 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 08 04 55 31.3200 -97.3300 251.000 122.0 127.388 3.470 -999.990 -999.990 1.274 ..P WKT 2011 04 10 08 09 55 31.3200 -97.3300 251.000 457.0 124.471 2.520 -999.990 -999.990 1.245 ..P WKT 2011 04 10 08 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 08 19 55 31.3200 -97.3300 251.000 122.0 137.082 3.140 -999.990 -999.990 1.371 ..P WKT 2011 04 10 08 24 55 31.3200 -97.3300 251.000 457.0 134.664 3.430 -999.990 -999.990 1.347 ..P WKT 2011 04 10 08 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 08 39 55 31.3200 -97.3300 251.000 122.0 134.031 3.360 -999.990 -999.990 1.340 ..P WKT 2011 04 10 08 44 55 31.3200 -97.3300 251.000 457.0 125.704 2.990 -999.990 -999.990 1.257 ..P WKT 2011 04 10 08 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 08 54 55 31.3200 -97.3300 251.000 122.0 131.642 4.160 -999.990 -999.990 1.316 ..P WKT 2011 04 10 08 59 55 31.3200 -97.3300 251.000 457.0 118.833 3.160 -999.990 -999.990 1.188 ..P WKT 2011 04 10 09 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 09 14 55 31.3200 -97.3300 251.000 122.0 136.256 3.540 -999.990 -999.990 1.363 ..P WKT 2011 04 10 09 19 55 31.3200 -97.3300 251.000 457.0 122.476 3.120 -999.990 -999.990 1.225 ..P WKT 2011 04 10 09 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 09 29 55 31.3200 -97.3300 251.000 122.0 130.452 3.020 -999.990 -999.990 1.305 ..P WKT 2011 04 10 09 34 55 31.3200 -97.3300 251.000 457.0 118.999 3.130 -999.990 -999.990 1.190 ..P WKT 2011 04 10 09 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 09 49 55 31.3200 -97.3300 251.000 122.0 129.705 3.340 -999.990 -999.990 1.297 ..P WKT 2011 04 10 09 54 55 31.3200 -97.3300 251.000 457.0 111.568 2.500 -999.990 -999.990 1.116 ..P WKT 2011 04 10 09 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 10 04 55 31.3200 -97.3300 251.000 122.0 122.766 2.950 -999.990 -999.990 1.228 ..P WKT 2011 04 10 10 09 55 31.3200 -97.3300 251.000 457.0 110.607 3.540 -999.990 -999.990 1.106 ..P WKT 2011 04 10 10 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 10 24 55 31.3200 -97.3300 251.000 122.0 121.832 2.790 -999.990 -999.990 1.218 ..P WKT 2011 04 10 10 29 55 31.3200 -97.3300 251.000 457.0 117.260 2.550 -999.990 -999.990 1.173 ..P WKT 2011 04 10 10 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 10 39 55 31.3200 -97.3300 251.000 122.0 123.382 2.450 -999.990 -999.990 1.234 ..P WKT 2011 04 10 10 44 55 31.3200 -97.3300 251.000 457.0 110.516 2.840 -999.990 -999.990 1.105 ..P WKT 2011 04 10 10 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 10 59 55 31.3200 -97.3300 251.000 122.0 117.708 3.140 -999.990 -999.990 1.177 ..P WKT 2011 04 10 11 04 55 31.3200 -97.3300 251.000 457.0 106.172 3.530 -999.990 -999.990 1.062 ..P WKT 2011 04 10 11 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 11 14 55 31.3200 -97.3300 251.000 122.0 122.741 3.770 -999.990 -999.990 1.227 ..P WKT 2011 04 10 11 19 55 31.3200 -97.3300 251.000 457.0 119.665 3.990 -999.990 -999.990 1.197 ..P WKT 2011 04 10 11 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 11 34 55 31.3200 -97.3300 251.000 122.0 122.352 4.370 -999.990 -999.990 1.224 ..P WKT 2011 04 10 11 39 55 31.3200 -97.3300 251.000 457.0 116.777 3.190 -999.990 -999.990 1.168 ..P WKT 2011 04 10 11 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 11 49 55 31.3200 -97.3300 251.000 122.0 119.223 2.150 -999.990 -999.990 1.192 ..P WKT 2011 04 10 12 09 55 31.3200 -97.3300 251.000 457.0 115.617 3.380 -999.990 -999.990 1.156 ..P WKT 2011 04 10 12 10 25 31.3200 -97.3300 251.000 457.0 115.435 3.160 -999.990 -999.990 1.154 ..P WKT 2011 04 10 12 10 55 31.3200 -97.3300 251.000 457.0 114.425 3.000 -999.990 -999.990 1.144 ..P WKT 2011 04 10 12 11 25 31.3200 -97.3300 251.000 457.0 119.547 2.880 -999.990 -999.990 1.195 ..P WKT 2011 04 10 12 11 55 31.3200 -97.3300 251.000 457.0 121.850 3.130 -999.990 -999.990 1.218 ..P WKT 2011 04 10 12 12 25 31.3200 -97.3300 251.000 457.0 119.514 4.740 -999.990 -999.990 1.195 ..P WKT 2011 04 10 12 12 55 31.3200 -97.3300 251.000 457.0 113.532 2.220 -999.990 -999.990 1.135 ..P WKT 2011 04 10 12 13 25 31.3200 -97.3300 251.000 457.0 114.510 2.300 -999.990 -999.990 1.145 ..P WKT 2011 04 10 12 13 55 31.3200 -97.3300 251.000 457.0 115.489 3.000 -999.990 -999.990 1.155 ..P WKT 2011 04 10 12 14 25 31.3200 -97.3300 251.000 457.0 118.289 2.310 -999.990 -999.990 1.183 ..P WKT 2011 04 10 12 14 55 31.3200 -97.3300 251.000 457.0 116.782 2.920 -999.990 -999.990 1.168 ..P WKT 2011 04 10 12 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 12 24 55 31.3200 -97.3300 251.000 122.0 120.934 2.890 -999.990 -999.990 1.209 ..P WKT 2011 04 10 12 29 55 31.3200 -97.3300 251.000 457.0 111.162 3.510 -999.990 -999.990 1.112 ..P WKT 2011 04 10 12 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 12 39 55 31.3200 -97.3300 251.000 122.0 118.959 3.300 -999.990 -999.990 1.190 ..P WKT 2011 04 10 12 44 55 31.3200 -97.3300 251.000 457.0 114.159 2.800 -999.990 -999.990 1.142 ..P WKT 2011 04 10 12 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 12 59 55 31.3200 -97.3300 251.000 122.0 116.693 3.130 -999.990 -999.990 1.167 ..P WKT 2011 04 10 13 04 55 31.3200 -97.3300 251.000 457.0 112.325 3.070 -999.990 -999.990 1.123 ..P WKT 2011 04 10 13 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 13 14 55 31.3200 -97.3300 251.000 122.0 123.133 2.420 -999.990 -999.990 1.231 ..P WKT 2011 04 10 13 19 55 31.3200 -97.3300 251.000 457.0 119.429 2.180 -999.990 -999.990 1.194 ..P WKT 2011 04 10 13 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 13 34 55 31.3200 -97.3300 251.000 122.0 113.995 2.360 -999.990 -999.990 1.140 ..P WKT 2011 04 10 13 39 55 31.3200 -97.3300 251.000 457.0 110.481 2.630 -999.990 -999.990 1.105 ..P WKT 2011 04 10 13 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 13 49 55 31.3200 -97.3300 251.000 122.0 117.690 4.910 -999.990 -999.990 1.177 ..P WKT 2011 04 10 13 54 55 31.3200 -97.3300 251.000 457.0 112.853 2.770 -999.990 -999.990 1.129 ..P WKT 2011 04 10 14 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 14 09 55 31.3200 -97.3300 251.000 122.0 111.679 3.150 -999.990 -999.990 1.117 ..P WKT 2011 04 10 14 14 55 31.3200 -97.3300 251.000 457.0 118.473 3.820 -999.990 -999.990 1.185 ..P WKT 2011 04 10 14 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 14 24 55 31.3200 -97.3300 251.000 122.0 117.831 4.890 -999.990 -999.990 1.178 ..P WKT 2011 04 10 14 29 55 31.3200 -97.3300 251.000 457.0 114.698 4.490 -999.990 -999.990 1.147 ..P WKT 2011 04 10 14 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 14 44 55 31.3200 -97.3300 251.000 122.0 113.523 3.720 -999.990 -999.990 1.135 ..P WKT 2011 04 10 14 49 55 31.3200 -97.3300 251.000 457.0 110.036 3.860 -999.990 -999.990 1.100 ..P WKT 2011 04 10 14 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 14 59 55 31.3200 -97.3300 251.000 122.0 111.994 3.360 -999.990 -999.990 1.120 ..P WKT 2011 04 10 15 04 55 31.3200 -97.3300 251.000 457.0 105.698 3.240 -999.990 -999.990 1.057 ..P WKT 2011 04 10 15 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 15 19 55 31.3200 -97.3300 251.000 122.0 118.624 3.710 -999.990 -999.990 1.186 ..P WKT 2011 04 10 15 24 55 31.3200 -97.3300 251.000 457.0 109.637 3.930 -999.990 -999.990 1.096 ..P WKT 2011 04 10 15 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 15 34 55 31.3200 -97.3300 251.000 122.0 114.805 3.410 -999.990 -999.990 1.148 ..P WKT 2011 04 10 15 39 55 31.3200 -97.3300 251.000 457.0 116.563 4.790 -999.990 -999.990 1.166 ..P WKT 2011 04 10 15 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 15 54 55 31.3200 -97.3300 251.000 122.0 121.478 4.990 -999.990 -999.990 1.215 ..P WKT 2011 04 10 15 59 55 31.3200 -97.3300 251.000 457.0 114.713 4.230 -999.990 -999.990 1.147 ..P WKT 2011 04 10 16 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 16 09 55 31.3200 -97.3300 251.000 122.0 112.751 4.600 -999.990 -999.990 1.128 ..P WKT 2011 04 10 16 14 55 31.3200 -97.3300 251.000 457.0 112.597 4.000 -999.990 -999.990 1.126 ..P WKT 2011 04 10 16 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 16 29 55 31.3200 -97.3300 251.000 122.0 114.491 4.890 -999.990 -999.990 1.145 ..P WKT 2011 04 10 16 34 55 31.3200 -97.3300 251.000 457.0 110.726 4.140 -999.990 -999.990 1.107 ..P WKT 2011 04 10 16 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 16 44 55 31.3200 -97.3300 251.000 122.0 117.069 4.560 -999.990 -999.990 1.171 ..P WKT 2011 04 10 16 49 55 31.3200 -97.3300 251.000 457.0 114.956 4.490 -999.990 -999.990 1.150 ..P WKT 2011 04 10 17 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 17 09 55 31.3200 -97.3300 251.000 122.0 117.425 4.650 -999.990 -999.990 1.174 ..P WKT 2011 04 10 17 14 55 31.3200 -97.3300 251.000 457.0 112.130 5.400 -999.990 -999.990 1.121 ..P WKT 2011 04 10 17 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 17 24 55 31.3200 -97.3300 251.000 122.0 120.685 3.880 -999.990 -999.990 1.207 ..P WKT 2011 04 10 17 29 55 31.3200 -97.3300 251.000 457.0 111.429 4.200 -999.990 -999.990 1.114 ..P WKT 2011 04 10 17 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 17 44 55 31.3200 -97.3300 251.000 122.0 111.484 3.550 -999.990 -999.990 1.115 ..P WKT 2011 04 10 17 49 55 31.3200 -97.3300 251.000 457.0 106.899 3.580 -999.990 -999.990 1.069 ..P WKT 2011 04 10 17 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 17 59 55 31.3200 -97.3300 251.000 122.0 112.905 3.860 -999.990 -999.990 1.129 ..P WKT 2011 04 10 18 04 55 31.3200 -97.3300 251.000 457.0 114.588 4.150 -999.990 -999.990 1.146 ..P WKT 2011 04 10 18 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 18 19 55 31.3200 -97.3300 251.000 122.0 117.092 4.310 -999.990 -999.990 1.171 ..P WKT 2011 04 10 18 24 55 31.3200 -97.3300 251.000 457.0 114.535 3.780 -999.990 -999.990 1.145 ..P WKT 2011 04 10 18 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 18 34 55 31.3200 -97.3300 251.000 122.0 116.345 3.910 -999.990 -999.990 1.163 ..P WKT 2011 04 10 18 39 55 31.3200 -97.3300 251.000 457.0 115.106 2.860 -999.990 -999.990 1.151 ..P WKT 2011 04 10 18 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 18 54 55 31.3200 -97.3300 251.000 122.0 107.814 3.250 -999.990 -999.990 1.078 ..P WKT 2011 04 10 18 59 55 31.3200 -97.3300 251.000 457.0 110.225 4.450 -999.990 -999.990 1.102 ..P WKT 2011 04 10 19 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 19 09 55 31.3200 -97.3300 251.000 122.0 106.809 3.420 -999.990 -999.990 1.068 ..P WKT 2011 04 10 19 14 55 31.3200 -97.3300 251.000 457.0 104.937 3.440 -999.990 -999.990 1.049 ..P WKT 2011 04 10 19 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 19 29 55 31.3200 -97.3300 251.000 122.0 120.102 3.380 -999.990 -999.990 1.201 ..P WKT 2011 04 10 19 34 55 31.3200 -97.3300 251.000 457.0 117.170 3.640 -999.990 -999.990 1.172 ..P WKT 2011 04 10 19 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 19 44 55 31.3200 -97.3300 251.000 122.0 120.531 3.410 -999.990 -999.990 1.205 ..P WKT 2011 04 10 19 49 55 31.3200 -97.3300 251.000 457.0 107.882 3.410 -999.990 -999.990 1.079 ..P WKT 2011 04 10 19 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 20 04 55 31.3200 -97.3300 251.000 122.0 125.557 3.490 -999.990 -999.990 1.256 ..P WKT 2011 04 10 20 09 55 31.3200 -97.3300 251.000 457.0 120.627 3.350 -999.990 -999.990 1.206 ..P WKT 2011 04 10 20 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 20 19 55 31.3200 -97.3300 251.000 122.0 129.537 3.280 -999.990 -999.990 1.295 ..P WKT 2011 04 10 20 24 55 31.3200 -97.3300 251.000 457.0 127.900 3.000 -999.990 -999.990 1.279 ..P WKT 2011 04 10 20 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 20 39 55 31.3200 -97.3300 251.000 122.0 127.551 3.410 -999.990 -999.990 1.276 ..P WKT 2011 04 10 20 44 55 31.3200 -97.3300 251.000 457.0 119.965 3.500 -999.990 -999.990 1.200 ..P WKT 2011 04 10 20 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 20 54 55 31.3200 -97.3300 251.000 122.0 121.748 5.470 -999.990 -999.990 1.217 ..P WKT 2011 04 10 20 59 55 31.3200 -97.3300 251.000 457.0 125.519 3.440 -999.990 -999.990 1.255 ..P WKT 2011 04 10 21 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 21 14 55 31.3200 -97.3300 251.000 122.0 133.303 3.100 -999.990 -999.990 1.333 ..P WKT 2011 04 10 21 19 55 31.3200 -97.3300 251.000 457.0 131.361 3.250 -999.990 -999.990 1.314 ..P WKT 2011 04 10 21 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 21 29 55 31.3200 -97.3300 251.000 122.0 131.755 3.910 -999.990 -999.990 1.318 ..P WKT 2011 04 10 21 34 55 31.3200 -97.3300 251.000 457.0 134.419 3.240 -999.990 -999.990 1.344 ..P WKT 2011 04 10 21 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 21 49 55 31.3200 -97.3300 251.000 122.0 133.811 3.200 -999.990 -999.990 1.338 ..P WKT 2011 04 10 21 54 55 31.3200 -97.3300 251.000 457.0 132.340 4.170 -999.990 -999.990 1.323 ..P WKT 2011 04 10 21 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 22 04 55 31.3200 -97.3300 251.000 122.0 140.578 3.830 -999.990 -999.990 1.406 ..P WKT 2011 04 10 22 09 55 31.3200 -97.3300 251.000 457.0 137.792 3.690 -999.990 -999.990 1.378 ..P WKT 2011 04 10 22 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 22 24 55 31.3200 -97.3300 251.000 122.0 140.236 3.220 -999.990 -999.990 1.402 ..P WKT 2011 04 10 22 29 55 31.3200 -97.3300 251.000 457.0 130.030 3.880 -999.990 -999.990 1.300 ..P WKT 2011 04 10 22 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 22 39 55 31.3200 -97.3300 251.000 122.0 129.673 4.020 -999.990 -999.990 1.297 ..P WKT 2011 04 10 22 44 55 31.3200 -97.3300 251.000 457.0 126.372 3.620 -999.990 -999.990 1.264 ..P WKT 2011 04 10 22 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 22 59 55 31.3200 -97.3300 251.000 122.0 119.194 4.120 -999.990 -999.990 1.192 ..P WKT 2011 04 10 23 04 55 31.3200 -97.3300 251.000 457.0 119.228 6.300 -999.990 -999.990 1.192 ..P WKT 2011 04 10 23 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 23 14 55 31.3200 -97.3300 251.000 122.0 122.579 5.680 -999.990 -999.990 1.226 ..P WKT 2011 04 10 23 19 55 31.3200 -97.3300 251.000 457.0 119.656 4.190 -999.990 -999.990 1.197 ..P WKT 2011 04 10 23 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 23 34 55 31.3200 -97.3300 251.000 122.0 122.864 5.240 -999.990 -999.990 1.229 ..P WKT 2011 04 10 23 39 55 31.3200 -97.3300 251.000 457.0 124.369 6.590 -999.990 -999.990 1.244 ..P WKT 2011 04 10 23 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 10 23 49 55 31.3200 -97.3300 251.000 122.0 129.676 4.440 -999.990 -999.990 1.297 ..P WKT 2011 04 11 00 09 55 31.3200 -97.3300 251.000 457.0 136.034 4.610 -999.990 -999.990 1.360 ..P WKT 2011 04 11 00 10 25 31.3200 -97.3300 251.000 457.0 130.927 3.160 -999.990 -999.990 1.309 ..P WKT 2011 04 11 00 10 55 31.3200 -97.3300 251.000 457.0 137.968 4.980 -999.990 -999.990 1.380 ..P WKT 2011 04 11 00 11 25 31.3200 -97.3300 251.000 457.0 141.235 3.360 -999.990 -999.990 1.412 ..P WKT 2011 04 11 00 11 55 31.3200 -97.3300 251.000 457.0 138.097 3.300 -999.990 -999.990 1.381 ..P WKT 2011 04 11 00 12 25 31.3200 -97.3300 251.000 457.0 138.407 3.610 -999.990 -999.990 1.384 ..P WKT 2011 04 11 00 12 55 31.3200 -97.3300 251.000 457.0 132.971 3.610 -999.990 -999.990 1.330 ..P WKT 2011 04 11 00 13 25 31.3200 -97.3300 251.000 457.0 143.462 5.360 -999.990 -999.990 1.435 ..P WKT 2011 04 11 00 13 55 31.3200 -97.3300 251.000 457.0 140.653 4.830 -999.990 -999.990 1.407 ..P WKT 2011 04 11 00 14 25 31.3200 -97.3300 251.000 457.0 141.292 3.910 -999.990 -999.990 1.413 ..P WKT 2011 04 11 00 14 55 31.3200 -97.3300 251.000 457.0 141.603 5.070 -999.990 -999.990 1.416 ..P WKT 2011 04 11 00 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 00 24 55 31.3200 -97.3300 251.000 122.0 139.769 4.340 -999.990 -999.990 1.398 ..P WKT 2011 04 11 00 29 55 31.3200 -97.3300 251.000 457.0 138.276 3.830 -999.990 -999.990 1.383 ..P WKT 2011 04 11 00 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 00 39 55 31.3200 -97.3300 251.000 122.0 141.369 3.170 -999.990 -999.990 1.414 ..P WKT 2011 04 11 00 44 55 31.3200 -97.3300 251.000 457.0 134.619 2.890 -999.990 -999.990 1.346 ..P WKT 2011 04 11 00 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 00 59 55 31.3200 -97.3300 251.000 122.0 142.820 2.900 -999.990 -999.990 1.428 ..P WKT 2011 04 11 01 04 55 31.3200 -97.3300 251.000 457.0 136.409 3.110 -999.990 -999.990 1.364 ..P WKT 2011 04 11 01 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 01 14 55 31.3200 -97.3300 251.000 122.0 145.614 4.380 -999.990 -999.990 1.456 ..P WKT 2011 04 11 01 19 55 31.3200 -97.3300 251.000 457.0 134.926 3.390 -999.990 -999.990 1.349 ..P WKT 2011 04 11 01 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 01 34 55 31.3200 -97.3300 251.000 122.0 134.757 3.970 -999.990 -999.990 1.348 ..P WKT 2011 04 11 01 39 55 31.3200 -97.3300 251.000 457.0 129.656 3.550 -999.990 -999.990 1.297 ..P WKT 2011 04 11 01 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 01 49 55 31.3200 -97.3300 251.000 122.0 138.208 3.670 -999.990 -999.990 1.382 ..P WKT 2011 04 11 01 54 55 31.3200 -97.3300 251.000 457.0 132.448 4.210 -999.990 -999.990 1.324 ..P WKT 2011 04 11 02 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 02 09 55 31.3200 -97.3300 251.000 122.0 127.858 3.610 -999.990 -999.990 1.279 ..P WKT 2011 04 11 02 14 55 31.3200 -97.3300 251.000 457.0 136.674 3.330 -999.990 -999.990 1.367 ..P WKT 2011 04 11 02 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 02 24 55 31.3200 -97.3300 251.000 122.0 136.531 4.180 -999.990 -999.990 1.365 ..P WKT 2011 04 11 02 29 55 31.3200 -97.3300 251.000 457.0 133.166 2.940 -999.990 -999.990 1.332 ..P WKT 2011 04 11 02 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 02 44 55 31.3200 -97.3300 251.000 122.0 136.009 3.520 -999.990 -999.990 1.360 ..P WKT 2011 04 11 02 49 55 31.3200 -97.3300 251.000 457.0 140.267 4.010 -999.990 -999.990 1.403 ..P WKT 2011 04 11 02 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 02 59 55 31.3200 -97.3300 251.000 122.0 138.241 4.640 -999.990 -999.990 1.382 ..P WKT 2011 04 11 03 04 55 31.3200 -97.3300 251.000 457.0 133.602 3.140 -999.990 -999.990 1.336 ..P WKT 2011 04 11 03 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 03 19 55 31.3200 -97.3300 251.000 122.0 135.152 4.030 -999.990 -999.990 1.352 ..P WKT 2011 04 11 03 24 55 31.3200 -97.3300 251.000 457.0 136.682 4.020 -999.990 -999.990 1.367 ..P WKT 2011 04 11 03 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 03 34 55 31.3200 -97.3300 251.000 122.0 138.093 3.420 -999.990 -999.990 1.381 ..P WKT 2011 04 11 03 39 55 31.3200 -97.3300 251.000 457.0 140.283 3.630 -999.990 -999.990 1.403 ..P WKT 2011 04 11 03 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 03 54 55 31.3200 -97.3300 251.000 122.0 132.998 3.830 -999.990 -999.990 1.330 ..P WKT 2011 04 11 03 59 55 31.3200 -97.3300 251.000 457.0 142.117 4.390 -999.990 -999.990 1.421 ..P WKT 2011 04 11 04 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 04 09 55 31.3200 -97.3300 251.000 122.0 137.261 3.220 -999.990 -999.990 1.373 ..P WKT 2011 04 11 04 14 55 31.3200 -97.3300 251.000 457.0 136.811 4.800 -999.990 -999.990 1.368 ..P WKT 2011 04 11 04 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 04 29 55 31.3200 -97.3300 251.000 122.0 135.016 3.070 -999.990 -999.990 1.350 ..P WKT 2011 04 11 04 34 55 31.3200 -97.3300 251.000 457.0 136.571 2.900 -999.990 -999.990 1.366 ..P WKT 2011 04 11 04 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 04 44 55 31.3200 -97.3300 251.000 122.0 134.234 2.560 -999.990 -999.990 1.342 ..P WKT 2011 04 11 04 49 55 31.3200 -97.3300 251.000 457.0 137.605 2.460 -999.990 -999.990 1.376 ..P WKT 2011 04 11 05 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 05 09 55 31.3200 -97.3300 251.000 122.0 145.962 3.370 -999.990 -999.990 1.460 ..P WKT 2011 04 11 05 14 55 31.3200 -97.3300 251.000 457.0 145.201 2.920 -999.990 -999.990 1.452 ..P WKT 2011 04 11 05 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 05 24 55 31.3200 -97.3300 251.000 122.0 142.685 3.610 -999.990 -999.990 1.427 ..P WKT 2011 04 11 05 29 55 31.3200 -97.3300 251.000 457.0 150.519 3.320 -999.990 -999.990 1.505 ..P WKT 2011 04 11 05 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 05 44 55 31.3200 -97.3300 251.000 122.0 142.435 4.100 -999.990 -999.990 1.424 ..P WKT 2011 04 11 05 49 55 31.3200 -97.3300 251.000 457.0 153.655 2.960 -999.990 -999.990 1.537 ..P WKT 2011 04 11 05 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 05 59 55 31.3200 -97.3300 251.000 122.0 151.293 2.730 -999.990 -999.990 1.513 ..P WKT 2011 04 11 06 04 55 31.3200 -97.3300 251.000 457.0 157.555 2.410 -999.990 -999.990 1.576 ..P WKT 2011 04 11 06 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 06 19 55 31.3200 -97.3300 251.000 122.0 149.687 2.700 -999.990 -999.990 1.497 ..P WKT 2011 04 11 06 24 55 31.3200 -97.3300 251.000 457.0 165.951 2.930 -999.990 -999.990 1.660 ..P WKT 2011 04 11 06 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 06 34 55 31.3200 -97.3300 251.000 122.0 153.471 2.810 -999.990 -999.990 1.535 ..P WKT 2011 04 11 06 39 55 31.3200 -97.3300 251.000 457.0 167.092 3.360 -999.990 -999.990 1.671 ..P WKT 2011 04 11 06 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 06 54 55 31.3200 -97.3300 251.000 122.0 149.996 3.340 -999.990 -999.990 1.500 ..P WKT 2011 04 11 06 59 55 31.3200 -97.3300 251.000 457.0 150.281 3.370 -999.990 -999.990 1.503 ..P WKT 2011 04 11 07 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 07 09 55 31.3200 -97.3300 251.000 122.0 146.543 3.590 -999.990 -999.990 1.465 ..P WKT 2011 04 11 07 14 55 31.3200 -97.3300 251.000 457.0 148.483 3.120 -999.990 -999.990 1.485 ..P WKT 2011 04 11 07 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 07 29 55 31.3200 -97.3300 251.000 122.0 147.134 3.090 -999.990 -999.990 1.471 ..P WKT 2011 04 11 07 34 55 31.3200 -97.3300 251.000 457.0 144.412 3.810 -999.990 -999.990 1.444 ..P WKT 2011 04 11 07 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 07 44 55 31.3200 -97.3300 251.000 122.0 152.556 3.140 -999.990 -999.990 1.526 ..P WKT 2011 04 11 07 49 55 31.3200 -97.3300 251.000 457.0 146.352 3.250 -999.990 -999.990 1.464 ..P WKT 2011 04 11 07 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 08 04 55 31.3200 -97.3300 251.000 122.0 155.520 3.450 -999.990 -999.990 1.555 ..P WKT 2011 04 11 08 09 55 31.3200 -97.3300 251.000 457.0 147.702 3.400 -999.990 -999.990 1.477 ..P WKT 2011 04 11 08 14 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 08 19 55 31.3200 -97.3300 251.000 122.0 156.446 3.660 -999.990 -999.990 1.564 ..P WKT 2011 04 11 08 24 55 31.3200 -97.3300 251.000 457.0 152.109 5.910 -999.990 -999.990 1.521 ..P WKT 2011 04 11 08 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 08 39 55 31.3200 -97.3300 251.000 122.0 156.639 3.710 -999.990 -999.990 1.566 ..P WKT 2011 04 11 08 44 55 31.3200 -97.3300 251.000 457.0 144.975 4.070 -999.990 -999.990 1.450 ..P WKT 2011 04 11 08 49 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 08 54 55 31.3200 -97.3300 251.000 122.0 146.871 2.960 -999.990 -999.990 1.469 ..P WKT 2011 04 11 08 59 55 31.3200 -97.3300 251.000 457.0 146.492 2.490 -999.990 -999.990 1.465 ..P WKT 2011 04 11 09 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 09 14 55 31.3200 -97.3300 251.000 122.0 151.663 2.980 -999.990 -999.990 1.517 ..P WKT 2011 04 11 09 19 55 31.3200 -97.3300 251.000 457.0 146.800 3.630 -999.990 -999.990 1.468 ..P WKT 2011 04 11 09 24 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 09 29 55 31.3200 -97.3300 251.000 122.0 140.393 2.120 -999.990 -999.990 1.404 ..P WKT 2011 04 11 09 34 55 31.3200 -97.3300 251.000 457.0 136.191 2.090 -999.990 -999.990 1.362 ..P WKT 2011 04 11 09 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 09 49 55 31.3200 -97.3300 251.000 122.0 143.001 4.230 -999.990 -999.990 1.430 ..P WKT 2011 04 11 09 54 55 31.3200 -97.3300 251.000 457.0 131.391 3.840 -999.990 -999.990 1.314 ..P WKT 2011 04 11 09 59 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 10 04 55 31.3200 -97.3300 251.000 122.0 142.074 3.670 -999.990 -999.990 1.421 ..P WKT 2011 04 11 10 09 55 31.3200 -97.3300 251.000 457.0 127.134 2.310 -999.990 -999.990 1.271 ..P WKT 2011 04 11 10 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 10 24 55 31.3200 -97.3300 251.000 122.0 134.516 3.240 -999.990 -999.990 1.345 ..P WKT 2011 04 11 10 29 55 31.3200 -97.3300 251.000 457.0 136.202 3.500 -999.990 -999.990 1.362 ..P WKT 2011 04 11 10 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 10 39 55 31.3200 -97.3300 251.000 122.0 141.904 4.000 -999.990 -999.990 1.419 ..P WKT 2011 04 11 10 44 55 31.3200 -97.3300 251.000 457.0 141.428 4.180 -999.990 -999.990 1.414 ..P WKT 2011 04 11 10 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 10 59 55 31.3200 -97.3300 251.000 122.0 142.566 5.190 -999.990 -999.990 1.426 ..P WKT 2011 04 11 11 04 55 31.3200 -97.3300 251.000 457.0 136.050 6.640 -999.990 -999.990 1.361 ..P WKT 2011 04 11 11 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 11 14 55 31.3200 -97.3300 251.000 122.0 144.490 3.670 -999.990 -999.990 1.445 ..P WKT 2011 04 11 11 19 55 31.3200 -97.3300 251.000 457.0 138.472 3.940 -999.990 -999.990 1.385 ..P WKT 2011 04 11 11 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 11 34 55 31.3200 -97.3300 251.000 122.0 148.070 4.100 -999.990 -999.990 1.481 ..P WKT 2011 04 11 11 39 55 31.3200 -97.3300 251.000 457.0 135.810 4.820 -999.990 -999.990 1.358 ..P WKT 2011 04 11 11 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 11 49 55 31.3200 -97.3300 251.000 122.0 152.432 3.460 -999.990 -999.990 1.524 ..P WKT 2011 04 11 12 09 55 31.3200 -97.3300 251.000 457.0 146.440 3.590 -999.990 -999.990 1.464 ..P WKT 2011 04 11 12 10 25 31.3200 -97.3300 251.000 457.0 143.077 3.860 -999.990 -999.990 1.431 ..P WKT 2011 04 11 12 10 55 31.3200 -97.3300 251.000 457.0 146.378 2.860 -999.990 -999.990 1.464 ..P WKT 2011 04 11 12 11 25 31.3200 -97.3300 251.000 457.0 147.347 3.080 -999.990 -999.990 1.473 ..P WKT 2011 04 11 12 11 55 31.3200 -97.3300 251.000 457.0 149.650 3.140 -999.990 -999.990 1.497 ..P WKT 2011 04 11 12 12 25 31.3200 -97.3300 251.000 457.0 145.121 3.800 -999.990 -999.990 1.451 ..P WKT 2011 04 11 12 12 55 31.3200 -97.3300 251.000 457.0 149.921 4.270 -999.990 -999.990 1.499 ..P WKT 2011 04 11 12 13 25 31.3200 -97.3300 251.000 457.0 152.223 2.980 -999.990 -999.990 1.522 ..P WKT 2011 04 11 12 13 55 31.3200 -97.3300 251.000 457.0 145.528 4.860 -999.990 -999.990 1.455 ..P WKT 2011 04 11 12 14 25 31.3200 -97.3300 251.000 457.0 142.665 2.820 -999.990 -999.990 1.427 ..P WKT 2011 04 11 12 14 55 31.3200 -97.3300 251.000 457.0 149.132 4.760 -999.990 -999.990 1.491 ..P WKT 2011 04 11 12 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 12 24 55 31.3200 -97.3300 251.000 122.0 164.510 3.760 -999.990 -999.990 1.645 ..P WKT 2011 04 11 12 29 55 31.3200 -97.3300 251.000 457.0 145.379 2.780 -999.990 -999.990 1.454 ..P WKT 2011 04 11 12 34 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 12 39 55 31.3200 -97.3300 251.000 122.0 158.423 3.350 -999.990 -999.990 1.584 ..P WKT 2011 04 11 12 44 55 31.3200 -97.3300 251.000 457.0 146.789 2.580 -999.990 -999.990 1.468 ..P WKT 2011 04 11 12 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 12 59 55 31.3200 -97.3300 251.000 122.0 155.358 2.790 -999.990 -999.990 1.554 ..P WKT 2011 04 11 13 04 55 31.3200 -97.3300 251.000 457.0 195.598 3.800 -999.990 -999.990 1.956 ..P WKT 2011 04 11 13 09 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 13 14 55 31.3200 -97.3300 251.000 122.0 158.179 4.390 -999.990 -999.990 1.582 ..P WKT 2011 04 11 13 19 55 31.3200 -97.3300 251.000 457.0 161.783 3.140 -999.990 -999.990 1.618 ..P WKT 2011 04 11 13 29 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 13 34 55 31.3200 -97.3300 251.000 122.0 152.615 3.980 -999.990 -999.990 1.526 ..P WKT 2011 04 11 13 39 55 31.3200 -97.3300 251.000 457.0 144.900 4.540 -999.990 -999.990 1.449 ..P WKT 2011 04 11 13 44 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 13 49 55 31.3200 -97.3300 251.000 122.0 157.100 3.150 -999.990 -999.990 1.571 ..P WKT 2011 04 11 13 54 55 31.3200 -97.3300 251.000 457.0 150.384 3.100 -999.990 -999.990 1.504 ..P WKT 2011 04 11 14 04 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 14 09 55 31.3200 -97.3300 251.000 122.0 157.339 3.260 -999.990 -999.990 1.573 ..P WKT 2011 04 11 14 14 55 31.3200 -97.3300 251.000 457.0 144.873 3.870 -999.990 -999.990 1.449 ..P WKT 2011 04 11 14 19 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 14 24 55 31.3200 -97.3300 251.000 122.0 152.884 2.450 -999.990 -999.990 1.529 ..P WKT 2011 04 11 14 29 55 31.3200 -97.3300 251.000 457.0 148.072 2.530 -999.990 -999.990 1.481 ..P WKT 2011 04 11 14 39 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 14 44 55 31.3200 -97.3300 251.000 122.0 153.125 3.300 -999.990 -999.990 1.531 ..P WKT 2011 04 11 14 49 55 31.3200 -97.3300 251.000 457.0 152.401 3.670 -999.990 -999.990 1.524 ..P WKT 2011 04 11 14 54 55 31.3200 -97.3300 251.000 30.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 11 14 59 55 31.3200 -97.3300 251.000 122.0 157.606 3.570 -999.990 -999.990 1.576 ..P WKT 2011 04 11 15 04 55 31.3200 -97.3300 251.000 457.0 148.732 3.020 -999.990 -999.990 1.487 ..P WKT 2011 04 11 15 19 55 31.3200 -97.3300 251.000 122.0 158.367 4.030 -999.990 -999.990 1.584 ..P WKT 2011 04 11 15 24 55 31.3200 -97.3300 251.000 457.0 153.153 3.710 -999.990 -999.990 1.532 ..P WKT 2011 04 11 15 29 55 31.3200 -97.3300 251.000 30.0 160.078 3.860 -999.990 -999.990 1.601 ..P WKT 2011 04 11 15 34 55 31.3200 -97.3300 251.000 122.0 159.021 3.210 -999.990 -999.990 1.590 ..P WKT 2011 04 11 15 39 55 31.3200 -97.3300 251.000 457.0 152.645 3.730 -999.990 -999.990 1.526 ..P WKT 2011 04 11 15 49 55 31.3200 -97.3300 251.000 30.0 156.374 4.320 -999.990 -999.990 1.564 ..P WKT 2011 04 11 15 54 55 31.3200 -97.3300 251.000 122.0 156.339 4.810 -999.990 -999.990 1.563 ..P WKT 2011 04 11 15 59 55 31.3200 -97.3300 251.000 457.0 151.650 3.390 -999.990 -999.990 1.517 ..P WKT 2011 04 11 16 04 55 31.3200 -97.3300 251.000 30.0 155.272 3.470 -999.990 -999.990 1.553 ..P WKT 2011 04 11 16 09 55 31.3200 -97.3300 251.000 122.0 159.392 3.320 -999.990 -999.990 1.594 ..P WKT 2011 04 11 16 14 55 31.3200 -97.3300 251.000 457.0 156.199 4.120 -999.990 -999.990 1.562 ..P WKT 2011 04 11 16 24 55 31.3200 -97.3300 251.000 30.0 157.245 2.910 -999.990 -999.990 1.572 ..P WKT 2011 04 11 16 29 55 31.3200 -97.3300 251.000 122.0 151.014 3.060 -999.990 -999.990 1.510 ..P WKT 2011 04 11 16 34 55 31.3200 -97.3300 251.000 457.0 146.944 3.630 -999.990 -999.990 1.469 ..P WKT 2011 04 11 16 39 55 31.3200 -97.3300 251.000 30.0 151.016 2.840 -999.990 -999.990 1.510 ..P WKT 2011 04 11 16 44 55 31.3200 -97.3300 251.000 122.0 158.076 2.810 -999.990 -999.990 1.581 ..P WKT 2011 04 11 16 49 55 31.3200 -97.3300 251.000 457.0 151.183 2.780 -999.990 -999.990 1.512 ..P WKT 2011 04 11 17 04 55 31.3200 -97.3300 251.000 30.0 152.158 2.730 -999.990 -999.990 1.522 ..P WKT 2011 04 11 17 09 55 31.3200 -97.3300 251.000 122.0 152.936 2.800 -999.990 -999.990 1.529 ..P WKT 2011 04 11 17 14 55 31.3200 -97.3300 251.000 457.0 146.739 3.330 -999.990 -999.990 1.467 ..P WKT 2011 04 11 17 19 55 31.3200 -97.3300 251.000 30.0 151.502 3.130 -999.990 -999.990 1.515 ..P WKT 2011 04 11 17 24 55 31.3200 -97.3300 251.000 122.0 151.615 3.330 -999.990 -999.990 1.516 ..P WKT 2011 04 11 17 29 55 31.3200 -97.3300 251.000 457.0 143.427 2.920 -999.990 -999.990 1.434 ..P WKT 2011 04 11 17 39 55 31.3200 -97.3300 251.000 30.0 149.507 3.520 -999.990 -999.990 1.495 ..P WKT 2011 04 11 17 44 55 31.3200 -97.3300 251.000 122.0 144.183 2.570 -999.990 -999.990 1.442 ..P WKT 2011 04 11 17 49 55 31.3200 -97.3300 251.000 457.0 147.162 3.100 -999.990 -999.990 1.472 ..P WKT 2011 04 11 17 54 55 31.3200 -97.3300 251.000 30.0 145.823 2.300 -999.990 -999.990 1.458 ..P WKT 2011 04 11 17 59 55 31.3200 -97.3300 251.000 122.0 145.812 4.320 -999.990 -999.990 1.458 ..P WKT 2011 04 11 18 04 55 31.3200 -97.3300 251.000 457.0 149.453 2.570 -999.990 -999.990 1.495 ..P WKT 2011 04 11 18 14 55 31.3200 -97.3300 251.000 30.0 153.106 4.020 -999.990 -999.990 1.531 ..P WKT 2011 04 11 18 19 55 31.3200 -97.3300 251.000 122.0 152.455 3.420 -999.990 -999.990 1.525 ..P WKT 2011 04 11 18 24 55 31.3200 -97.3300 251.000 457.0 142.842 4.120 -999.990 -999.990 1.428 ..P WKT 2011 04 11 18 29 55 31.3200 -97.3300 251.000 30.0 147.833 3.310 -999.990 -999.990 1.478 ..P WKT 2011 04 11 18 34 55 31.3200 -97.3300 251.000 122.0 149.339 3.090 -999.990 -999.990 1.493 ..P WKT 2011 04 11 18 39 55 31.3200 -97.3300 251.000 457.0 142.384 4.130 -999.990 -999.990 1.424 ..P WKT 2011 04 11 18 49 55 31.3200 -97.3300 251.000 30.0 147.031 2.770 -999.990 -999.990 1.470 ..P WKT 2011 04 11 18 54 55 31.3200 -97.3300 251.000 122.0 138.892 3.730 -999.990 -999.990 1.389 ..P WKT 2011 04 11 18 59 55 31.3200 -97.3300 251.000 457.0 143.028 4.530 -999.990 -999.990 1.430 ..P WKT 2011 04 11 19 04 55 31.3200 -97.3300 251.000 30.0 141.856 4.060 -999.990 -999.990 1.419 ..P WKT 2011 04 11 19 09 55 31.3200 -97.3300 251.000 122.0 139.523 4.060 -999.990 -999.990 1.395 ..P WKT 2011 04 11 19 14 55 31.3200 -97.3300 251.000 457.0 142.332 3.710 -999.990 -999.990 1.423 ..P WKT 2011 04 11 19 24 55 31.3200 -97.3300 251.000 30.0 140.961 3.530 -999.990 -999.990 1.410 ..P WKT 2011 04 11 19 29 55 31.3200 -97.3300 251.000 122.0 137.279 3.450 -999.990 -999.990 1.373 ..P WKT 2011 04 11 19 34 55 31.3200 -97.3300 251.000 457.0 137.908 4.040 -999.990 -999.990 1.379 ..P WKT 2011 04 11 19 39 55 31.3200 -97.3300 251.000 30.0 140.030 4.870 -999.990 -999.990 1.400 ..P WKT 2011 04 11 19 44 55 31.3200 -97.3300 251.000 122.0 140.327 3.370 -999.990 -999.990 1.403 ..P WKT 2011 04 11 19 49 55 31.3200 -97.3300 251.000 457.0 139.961 4.020 -999.990 -999.990 1.400 ..P WKT 2011 04 11 19 59 55 31.3200 -97.3300 251.000 30.0 138.329 3.510 -999.990 -999.990 1.383 ..P WKT 2011 04 11 20 04 55 31.3200 -97.3300 251.000 122.0 136.402 4.330 -999.990 -999.990 1.364 ..P WKT 2011 04 11 20 09 55 31.3200 -97.3300 251.000 457.0 138.782 3.400 -999.990 -999.990 1.388 ..P WKT 2011 04 11 20 14 55 31.3200 -97.3300 251.000 30.0 137.352 3.680 -999.990 -999.990 1.374 ..P WKT 2011 04 11 20 19 55 31.3200 -97.3300 251.000 122.0 140.562 3.530 -999.990 -999.990 1.406 ..P WKT 2011 04 11 20 24 55 31.3200 -97.3300 251.000 457.0 137.970 3.740 -999.990 -999.990 1.380 ..P WKT 2011 04 11 20 34 55 31.3200 -97.3300 251.000 30.0 136.292 3.600 -999.990 -999.990 1.363 ..P WKT 2011 04 11 20 39 55 31.3200 -97.3300 251.000 122.0 131.075 3.510 -999.990 -999.990 1.311 ..P WKT 2011 04 11 20 44 55 31.3200 -97.3300 251.000 457.0 136.461 3.710 -999.990 -999.990 1.365 ..P WKT 2011 04 11 20 49 55 31.3200 -97.3300 251.000 30.0 133.232 3.360 -999.990 -999.990 1.332 ..P WKT 2011 04 11 20 54 55 31.3200 -97.3300 251.000 122.0 135.636 2.970 -999.990 -999.990 1.356 ..P WKT 2011 04 11 20 59 55 31.3200 -97.3300 251.000 457.0 132.739 4.670 -999.990 -999.990 1.327 ..P WKT 2011 04 11 21 09 55 31.3200 -97.3300 251.000 30.0 141.664 3.710 -999.990 -999.990 1.417 ..P WKT 2011 04 11 21 14 55 31.3200 -97.3300 251.000 122.0 137.583 3.040 -999.990 -999.990 1.376 ..P WKT 2011 04 11 21 19 55 31.3200 -97.3300 251.000 457.0 140.460 3.170 -999.990 -999.990 1.405 ..P WKT 2011 04 11 21 24 55 31.3200 -97.3300 251.000 30.0 146.648 4.360 -999.990 -999.990 1.466 ..P WKT 2011 04 11 21 29 55 31.3200 -97.3300 251.000 122.0 143.231 3.640 -999.990 -999.990 1.432 ..P WKT 2011 04 11 21 34 55 31.3200 -97.3300 251.000 457.0 142.794 4.960 -999.990 -999.990 1.428 ..P WKT 2011 04 11 21 44 55 31.3200 -97.3300 251.000 30.0 139.083 3.940 -999.990 -999.990 1.391 ..P WKT 2011 04 11 21 49 55 31.3200 -97.3300 251.000 122.0 138.789 3.410 -999.990 -999.990 1.388 ..P WKT 2011 04 11 21 54 55 31.3200 -97.3300 251.000 457.0 134.190 4.110 -999.990 -999.990 1.342 ..P WKT 2011 04 11 21 59 55 31.3200 -97.3300 251.000 30.0 131.247 5.100 -999.990 -999.990 1.312 ..P WKT 2011 04 11 22 00 25 31.3200 -97.3300 251.000 30.0 138.071 4.610 -999.990 -999.990 1.381 ..P WKT 2011 04 11 22 00 55 31.3200 -97.3300 251.000 30.0 135.956 4.840 -999.990 -999.990 1.360 ..P WKT 2011 04 11 22 01 25 31.3200 -97.3300 251.000 30.0 134.834 4.730 -999.990 -999.990 1.348 ..P WKT 2011 04 11 22 01 55 31.3200 -97.3300 251.000 30.0 131.063 4.620 -999.990 -999.990 1.311 ..P WKT 2011 04 11 22 02 25 31.3200 -97.3300 251.000 30.0 133.252 4.420 -999.990 -999.990 1.333 ..P WKT 2011 04 11 22 02 55 31.3200 -97.3300 251.000 30.0 130.805 4.420 -999.990 -999.990 1.308 ..P WKT 2011 04 11 22 03 25 31.3200 -97.3300 251.000 30.0 134.319 4.260 -999.990 -999.990 1.343 ..P WKT 2011 04 11 22 03 55 31.3200 -97.3300 251.000 30.0 128.893 4.340 -999.990 -999.990 1.289 ..P WKT 2011 04 11 22 04 25 31.3200 -97.3300 251.000 30.0 134.724 5.490 -999.990 -999.990 1.347 ..P WKT 2011 04 11 22 04 55 31.3200 -97.3300 251.000 30.0 128.635 5.710 -999.990 -999.990 1.286 ..P WKT 2011 04 11 22 09 55 31.3200 -97.3300 251.000 457.0 132.315 3.400 -999.990 -999.990 1.323 ..P WKT 2011 04 11 22 19 55 31.3200 -97.3300 251.000 30.0 137.119 3.320 -999.990 -999.990 1.371 ..P WKT 2011 04 11 22 24 55 31.3200 -97.3300 251.000 122.0 125.664 4.300 -999.990 -999.990 1.257 ..P WKT 2011 04 11 22 29 55 31.3200 -97.3300 251.000 457.0 133.740 5.110 -999.990 -999.990 1.337 ..P WKT 2011 04 11 22 34 55 31.3200 -97.3300 251.000 30.0 135.196 4.390 -999.990 -999.990 1.352 ..P WKT 2011 04 11 22 39 55 31.3200 -97.3300 251.000 122.0 139.299 3.500 -999.990 -999.990 1.393 ..P WKT 2011 04 11 22 44 55 31.3200 -97.3300 251.000 457.0 127.848 3.260 -999.990 -999.990 1.278 ..P WKT 2011 04 11 22 54 55 31.3200 -97.3300 251.000 30.0 140.828 3.310 -999.990 -999.990 1.408 ..P WKT 2011 04 11 22 59 55 31.3200 -97.3300 251.000 122.0 140.108 2.650 -999.990 -999.990 1.401 ..P WKT 2011 04 11 23 04 55 31.3200 -97.3300 251.000 457.0 141.540 3.160 -999.990 -999.990 1.415 ..P WKT 2011 04 11 23 09 55 31.3200 -97.3300 251.000 30.0 134.865 2.620 -999.990 -999.990 1.349 ..P WKT 2011 04 11 23 14 55 31.3200 -97.3300 251.000 122.0 141.920 3.180 -999.990 -999.990 1.419 ..P WKT 2011 04 11 23 19 55 31.3200 -97.3300 251.000 457.0 144.014 2.910 -999.990 -999.990 1.440 ..P WKT 2011 04 11 23 29 55 31.3200 -97.3300 251.000 30.0 143.159 2.540 -999.990 -999.990 1.432 ..P WKT 2011 04 11 23 34 55 31.3200 -97.3300 251.000 122.0 135.747 3.040 -999.990 -999.990 1.357 ..P WKT 2011 04 11 23 39 55 31.3200 -97.3300 251.000 457.0 136.275 3.010 -999.990 -999.990 1.363 ..P WKT 2011 04 11 23 44 55 31.3200 -97.3300 251.000 30.0 138.787 3.690 -999.990 -999.990 1.388 ..P WKT 2011 04 11 23 49 55 31.3200 -97.3300 251.000 122.0 142.455 2.350 -999.990 -999.990 1.425 ..P WKT 2011 04 12 00 09 55 31.3200 -97.3300 251.000 457.0 139.409 3.070 -999.990 -999.990 1.394 ..P WKT 2011 04 12 00 10 25 31.3200 -97.3300 251.000 457.0 141.377 2.930 -999.990 -999.990 1.414 ..P WKT 2011 04 12 00 10 55 31.3200 -97.3300 251.000 457.0 138.714 2.790 -999.990 -999.990 1.387 ..P WKT 2011 04 12 00 11 25 31.3200 -97.3300 251.000 457.0 134.728 3.220 -999.990 -999.990 1.347 ..P WKT 2011 04 12 00 11 55 31.3200 -97.3300 251.000 457.0 136.862 2.600 -999.990 -999.990 1.369 ..P WKT 2011 04 12 00 12 25 31.3200 -97.3300 251.000 457.0 131.553 3.800 -999.990 -999.990 1.316 ..P WKT 2011 04 12 00 12 55 31.3200 -97.3300 251.000 457.0 133.521 3.990 -999.990 -999.990 1.335 ..P WKT 2011 04 12 00 13 25 31.3200 -97.3300 251.000 457.0 136.812 4.060 -999.990 -999.990 1.368 ..P WKT 2011 04 12 00 13 55 31.3200 -97.3300 251.000 457.0 137.787 4.530 -999.990 -999.990 1.378 ..P WKT 2011 04 12 00 14 25 31.3200 -97.3300 251.000 457.0 132.975 4.890 -999.990 -999.990 1.330 ..P WKT 2011 04 12 00 14 55 31.3200 -97.3300 251.000 457.0 133.288 3.680 -999.990 -999.990 1.333 ..P WKT 2011 04 12 00 19 55 31.3200 -97.3300 251.000 30.0 132.459 4.100 -999.990 -999.990 1.325 ..P WKT 2011 04 12 00 24 55 31.3200 -97.3300 251.000 122.0 134.938 3.260 -999.990 -999.990 1.349 ..P WKT 2011 04 12 00 29 55 31.3200 -97.3300 251.000 457.0 130.801 4.000 -999.990 -999.990 1.308 ..P WKT 2011 04 12 00 34 55 31.3200 -97.3300 251.000 30.0 138.740 4.150 -999.990 -999.990 1.387 ..P WKT 2011 04 12 00 39 55 31.3200 -97.3300 251.000 122.0 135.925 3.430 -999.990 -999.990 1.359 ..P WKT 2011 04 12 00 44 55 31.3200 -97.3300 251.000 457.0 131.124 4.280 -999.990 -999.990 1.311 ..P WKT 2011 04 12 00 54 55 31.3200 -97.3300 251.000 30.0 132.302 3.950 -999.990 -999.990 1.323 ..P WKT 2011 04 12 00 59 55 31.3200 -97.3300 251.000 122.0 136.131 4.200 -999.990 -999.990 1.361 ..P WKT 2011 04 12 01 04 55 31.3200 -97.3300 251.000 457.0 137.642 3.630 -999.990 -999.990 1.376 ..P WKT 2011 04 12 01 09 55 31.3200 -97.3300 251.000 30.0 135.346 3.830 -999.990 -999.990 1.353 ..P WKT 2011 04 12 01 14 55 31.3200 -97.3300 251.000 122.0 134.706 4.800 -999.990 -999.990 1.347 ..P WKT 2011 04 12 01 19 55 31.3200 -97.3300 251.000 457.0 134.727 3.720 -999.990 -999.990 1.347 ..P WKT 2011 04 12 01 29 55 31.3200 -97.3300 251.000 30.0 130.536 3.550 -999.990 -999.990 1.305 ..P WKT 2011 04 12 01 34 55 31.3200 -97.3300 251.000 122.0 138.578 4.450 -999.990 -999.990 1.386 ..P WKT 2011 04 12 01 39 55 31.3200 -97.3300 251.000 457.0 138.008 3.500 -999.990 -999.990 1.380 ..P WKT 2011 04 12 01 44 55 31.3200 -97.3300 251.000 30.0 136.444 4.570 -999.990 -999.990 1.364 ..P WKT 2011 04 12 01 49 55 31.3200 -97.3300 251.000 122.0 139.188 5.760 -999.990 -999.990 1.392 ..P WKT 2011 04 12 01 54 55 31.3200 -97.3300 251.000 457.0 135.967 5.190 -999.990 -999.990 1.360 ..P WKT 2011 04 12 02 04 55 31.3200 -97.3300 251.000 30.0 140.271 4.770 -999.990 -999.990 1.403 ..P WKT 2011 04 12 02 09 55 31.3200 -97.3300 251.000 122.0 139.512 4.090 -999.990 -999.990 1.395 ..P WKT 2011 04 12 02 14 55 31.3200 -97.3300 251.000 457.0 146.046 3.220 -999.990 -999.990 1.460 ..P WKT 2011 04 12 02 19 55 31.3200 -97.3300 251.000 30.0 145.949 3.040 -999.990 -999.990 1.459 ..P WKT 2011 04 12 02 24 55 31.3200 -97.3300 251.000 122.0 144.859 3.470 -999.990 -999.990 1.449 ..P WKT 2011 04 12 02 29 55 31.3200 -97.3300 251.000 457.0 140.786 3.480 -999.990 -999.990 1.408 ..P WKT 2011 04 12 02 39 55 31.3200 -97.3300 251.000 30.0 142.416 4.620 -999.990 -999.990 1.424 ..P WKT 2011 04 12 02 44 55 31.3200 -97.3300 251.000 122.0 145.802 4.230 -999.990 -999.990 1.458 ..P WKT 2011 04 12 02 49 55 31.3200 -97.3300 251.000 457.0 138.908 2.960 -999.990 -999.990 1.389 ..P WKT 2011 04 12 02 54 55 31.3200 -97.3300 251.000 30.0 137.319 3.650 -999.990 -999.990 1.373 ..P WKT 2011 04 12 02 59 55 31.3200 -97.3300 251.000 122.0 135.398 3.250 -999.990 -999.990 1.354 ..P WKT 2011 04 12 03 04 55 31.3200 -97.3300 251.000 457.0 135.633 4.300 -999.990 -999.990 1.356 ..P WKT 2011 04 12 03 14 55 31.3200 -97.3300 251.000 30.0 141.507 3.560 -999.990 -999.990 1.415 ..P WKT 2011 04 12 03 19 55 31.3200 -97.3300 251.000 122.0 137.855 3.890 -999.990 -999.990 1.379 ..P WKT 2011 04 12 03 24 55 31.3200 -97.3300 251.000 457.0 132.545 3.230 -999.990 -999.990 1.325 ..P WKT 2011 04 12 03 29 55 31.3200 -97.3300 251.000 30.0 137.687 3.630 -999.990 -999.990 1.377 ..P WKT 2011 04 12 03 34 55 31.3200 -97.3300 251.000 122.0 136.855 3.820 -999.990 -999.990 1.369 ..P WKT 2011 04 12 03 39 55 31.3200 -97.3300 251.000 457.0 136.521 3.460 -999.990 -999.990 1.365 ..P WKT 2011 04 12 03 49 55 31.3200 -97.3300 251.000 30.0 140.146 3.180 -999.990 -999.990 1.401 ..P WKT 2011 04 12 03 54 55 31.3200 -97.3300 251.000 122.0 139.456 3.320 -999.990 -999.990 1.395 ..P WKT 2011 04 12 03 59 55 31.3200 -97.3300 251.000 457.0 138.435 3.270 -999.990 -999.990 1.384 ..P WKT 2011 04 12 04 04 55 31.3200 -97.3300 251.000 30.0 137.580 3.300 -999.990 -999.990 1.376 ..P WKT 2011 04 12 04 09 55 31.3200 -97.3300 251.000 122.0 134.565 4.800 -999.990 -999.990 1.346 ..P WKT 2011 04 12 04 14 55 31.3200 -97.3300 251.000 457.0 145.831 3.790 -999.990 -999.990 1.458 ..P WKT 2011 04 12 04 24 55 31.3200 -97.3300 251.000 30.0 132.020 4.180 -999.990 -999.990 1.320 ..P WKT 2011 04 12 04 29 55 31.3200 -97.3300 251.000 122.0 140.987 6.010 -999.990 -999.990 1.410 ..P WKT 2011 04 12 04 34 55 31.3200 -97.3300 251.000 457.0 144.474 3.690 -999.990 -999.990 1.445 ..P WKT 2011 04 12 04 39 55 31.3200 -97.3300 251.000 30.0 146.466 4.180 -999.990 -999.990 1.465 ..P WKT 2011 04 12 04 44 55 31.3200 -97.3300 251.000 122.0 139.654 4.000 -999.990 -999.990 1.397 ..P WKT 2011 04 12 04 49 55 31.3200 -97.3300 251.000 457.0 145.800 4.090 -999.990 -999.990 1.458 ..P WKT 2011 04 12 05 04 55 31.3200 -97.3300 251.000 30.0 151.530 3.790 -999.990 -999.990 1.515 ..P WKT 2011 04 12 05 09 55 31.3200 -97.3300 251.000 122.0 152.319 4.090 -999.990 -999.990 1.523 ..P WKT 2011 04 12 05 14 55 31.3200 -97.3300 251.000 457.0 145.795 3.810 -999.990 -999.990 1.458 ..P WKT 2011 04 12 05 19 55 31.3200 -97.3300 251.000 30.0 149.908 3.930 -999.990 -999.990 1.499 ..P WKT 2011 04 12 05 24 55 31.3200 -97.3300 251.000 122.0 147.372 4.080 -999.990 -999.990 1.474 ..P WKT 2011 04 12 05 29 55 31.3200 -97.3300 251.000 457.0 145.832 4.280 -999.990 -999.990 1.458 ..P WKT 2011 04 12 05 39 55 31.3200 -97.3300 251.000 30.0 149.757 4.320 -999.990 -999.990 1.498 ..P WKT 2011 04 12 05 44 55 31.3200 -97.3300 251.000 122.0 147.570 3.970 -999.990 -999.990 1.476 ..P WKT 2011 04 12 05 49 55 31.3200 -97.3300 251.000 457.0 134.739 4.190 -999.990 -999.990 1.347 ..P WKT 2011 04 12 05 54 55 31.3200 -97.3300 251.000 30.0 138.206 4.210 -999.990 -999.990 1.382 ..P WKT 2011 04 12 05 59 55 31.3200 -97.3300 251.000 122.0 145.666 4.050 -999.990 -999.990 1.457 ..P WKT 2011 04 12 06 04 55 31.3200 -97.3300 251.000 457.0 139.486 5.650 -999.990 -999.990 1.395 ..P WKT 2011 04 12 06 14 55 31.3200 -97.3300 251.000 30.0 136.679 4.540 -999.990 -999.990 1.367 ..P WKT 2011 04 12 06 19 55 31.3200 -97.3300 251.000 122.0 140.384 4.200 -999.990 -999.990 1.404 ..P WKT 2011 04 12 06 24 55 31.3200 -97.3300 251.000 457.0 138.101 4.130 -999.990 -999.990 1.381 ..P WKT 2011 04 12 06 29 55 31.3200 -97.3300 251.000 30.0 136.482 4.430 -999.990 -999.990 1.365 ..P WKT 2011 04 12 06 34 55 31.3200 -97.3300 251.000 122.0 138.859 4.550 -999.990 -999.990 1.389 ..P WKT 2011 04 12 06 39 55 31.3200 -97.3300 251.000 457.0 130.915 4.930 -999.990 -999.990 1.309 ..P WKT 2011 04 12 06 49 55 31.3200 -97.3300 251.000 30.0 140.042 5.030 -999.990 -999.990 1.400 ..P WKT 2011 04 12 06 54 55 31.3200 -97.3300 251.000 122.0 140.469 5.380 -999.990 -999.990 1.405 ..P WKT 2011 04 12 06 59 55 31.3200 -97.3300 251.000 457.0 128.074 5.340 -999.990 -999.990 1.281 ..P WKT 2011 04 12 07 04 55 31.3200 -97.3300 251.000 30.0 135.994 4.420 -999.990 -999.990 1.360 ..P WKT 2011 04 12 07 09 55 31.3200 -97.3300 251.000 122.0 141.250 3.860 -999.990 -999.990 1.413 ..P WKT 2011 04 12 07 14 55 31.3200 -97.3300 251.000 457.0 136.014 3.780 -999.990 -999.990 1.360 ..P WKT 2011 04 12 07 24 55 31.3200 -97.3300 251.000 30.0 137.580 3.830 -999.990 -999.990 1.376 ..P WKT 2011 04 12 07 29 55 31.3200 -97.3300 251.000 122.0 141.386 3.740 -999.990 -999.990 1.414 ..P WKT 2011 04 12 07 34 55 31.3200 -97.3300 251.000 457.0 142.027 4.360 -999.990 -999.990 1.420 ..P WKT 2011 04 12 07 39 55 31.3200 -97.3300 251.000 30.0 140.669 5.100 -999.990 -999.990 1.407 ..P WKT 2011 04 12 07 44 55 31.3200 -97.3300 251.000 122.0 144.643 4.360 -999.990 -999.990 1.446 ..P WKT 2011 04 12 07 49 55 31.3200 -97.3300 251.000 457.0 142.285 4.610 -999.990 -999.990 1.423 ..P WKT 2011 04 12 07 59 55 31.3200 -97.3300 251.000 30.0 140.830 4.310 -999.990 -999.990 1.408 ..P WKT 2011 04 12 08 04 55 31.3200 -97.3300 251.000 122.0 143.067 4.230 -999.990 -999.990 1.431 ..P WKT 2011 04 12 08 09 55 31.3200 -97.3300 251.000 457.0 149.972 4.400 -999.990 -999.990 1.500 ..P WKT 2011 04 12 08 14 55 31.3200 -97.3300 251.000 30.0 148.376 4.580 -999.990 -999.990 1.484 ..P WKT 2011 04 12 08 19 55 31.3200 -97.3300 251.000 122.0 147.780 4.650 -999.990 -999.990 1.478 ..P WKT 2011 04 12 08 24 55 31.3200 -97.3300 251.000 457.0 157.854 3.860 -999.990 -999.990 1.579 ..P WKT 2011 04 12 08 34 55 31.3200 -97.3300 251.000 30.0 146.610 3.680 -999.990 -999.990 1.466 ..P WKT 2011 04 12 08 39 55 31.3200 -97.3300 251.000 122.0 157.306 5.260 -999.990 -999.990 1.573 ..P WKT 2011 04 12 08 44 55 31.3200 -97.3300 251.000 457.0 145.821 5.360 -999.990 -999.990 1.458 ..P WKT 2011 04 12 08 49 55 31.3200 -97.3300 251.000 30.0 142.507 4.200 -999.990 -999.990 1.425 ..P WKT 2011 04 12 08 54 55 31.3200 -97.3300 251.000 122.0 143.364 4.210 -999.990 -999.990 1.434 ..P WKT 2011 04 12 08 59 55 31.3200 -97.3300 251.000 457.0 135.045 4.140 -999.990 -999.990 1.350 ..P WKT 2011 04 12 09 09 55 31.3200 -97.3300 251.000 30.0 143.337 4.000 -999.990 -999.990 1.433 ..P WKT 2011 04 12 09 14 55 31.3200 -97.3300 251.000 122.0 148.437 4.260 -999.990 -999.990 1.484 ..P WKT 2011 04 12 09 19 55 31.3200 -97.3300 251.000 457.0 141.522 4.470 -999.990 -999.990 1.415 ..P WKT 2011 04 12 09 24 55 31.3200 -97.3300 251.000 30.0 148.292 4.050 -999.990 -999.990 1.483 ..P WKT 2011 04 12 09 29 55 31.3200 -97.3300 251.000 122.0 149.388 4.230 -999.990 -999.990 1.494 ..P WKT 2011 04 12 09 34 55 31.3200 -97.3300 251.000 457.0 138.799 5.190 -999.990 -999.990 1.388 ..P WKT 2011 04 12 09 44 55 31.3200 -97.3300 251.000 30.0 148.480 4.180 -999.990 -999.990 1.485 ..P WKT 2011 04 12 09 49 55 31.3200 -97.3300 251.000 122.0 142.706 3.840 -999.990 -999.990 1.427 ..P WKT 2011 04 12 09 54 55 31.3200 -97.3300 251.000 457.0 139.604 4.790 -999.990 -999.990 1.396 ..P WKT 2011 04 12 09 59 55 31.3200 -97.3300 251.000 30.0 145.852 5.200 -999.990 -999.990 1.459 ..P WKT 2011 04 12 10 04 55 31.3200 -97.3300 251.000 122.0 146.090 3.760 -999.990 -999.990 1.461 ..P WKT 2011 04 12 10 09 55 31.3200 -97.3300 251.000 457.0 138.978 3.860 -999.990 -999.990 1.390 ..P WKT 2011 04 12 10 19 55 31.3200 -97.3300 251.000 30.0 144.226 3.800 -999.990 -999.990 1.442 ..P WKT 2011 04 12 10 24 55 31.3200 -97.3300 251.000 122.0 136.539 3.910 -999.990 -999.990 1.365 ..P WKT 2011 04 12 10 29 55 31.3200 -97.3300 251.000 457.0 140.547 4.200 -999.990 -999.990 1.405 ..P WKT 2011 04 12 10 34 55 31.3200 -97.3300 251.000 30.0 148.232 4.370 -999.990 -999.990 1.482 ..P WKT 2011 04 12 10 39 55 31.3200 -97.3300 251.000 122.0 137.536 5.890 -999.990 -999.990 1.375 ..P WKT 2011 04 12 10 44 55 31.3200 -97.3300 251.000 457.0 141.545 3.940 -999.990 -999.990 1.415 ..P WKT 2011 04 12 10 54 55 31.3200 -97.3300 251.000 30.0 151.907 4.020 -999.990 -999.990 1.519 ..P WKT 2011 04 12 10 59 55 31.3200 -97.3300 251.000 122.0 135.691 4.780 -999.990 -999.990 1.357 ..P WKT 2011 04 12 11 04 55 31.3200 -97.3300 251.000 457.0 137.361 4.310 -999.990 -999.990 1.374 ..P WKT 2011 04 12 11 09 55 31.3200 -97.3300 251.000 30.0 152.071 4.020 -999.990 -999.990 1.521 ..P WKT 2011 04 12 11 14 55 31.3200 -97.3300 251.000 122.0 142.708 5.820 -999.990 -999.990 1.427 ..P WKT 2011 04 12 11 19 55 31.3200 -97.3300 251.000 457.0 140.030 5.110 -999.990 -999.990 1.400 ..P WKT 2011 04 12 11 29 55 31.3200 -97.3300 251.000 30.0 157.359 5.880 -999.990 -999.990 1.574 ..P WKT 2011 04 12 11 34 55 31.3200 -97.3300 251.000 122.0 138.061 6.040 -999.990 -999.990 1.381 ..P WKT 2011 04 12 11 39 55 31.3200 -97.3300 251.000 457.0 142.011 4.460 -999.990 -999.990 1.420 ..P WKT 2011 04 12 11 44 55 31.3200 -97.3300 251.000 30.0 151.817 5.140 -999.990 -999.990 1.518 ..P WKT 2011 04 12 11 49 55 31.3200 -97.3300 251.000 122.0 136.864 6.220 -999.990 -999.990 1.369 ..P WKT 2011 04 12 12 09 55 31.3200 -97.3300 251.000 457.0 135.796 4.710 -999.990 -999.990 1.358 ..P WKT 2011 04 12 12 10 25 31.3200 -97.3300 251.000 457.0 134.970 4.570 -999.990 -999.990 1.350 ..P WKT 2011 04 12 12 10 55 31.3200 -97.3300 251.000 457.0 141.171 5.490 -999.990 -999.990 1.412 ..P WKT 2011 04 12 12 11 25 31.3200 -97.3300 251.000 457.0 141.349 5.260 -999.990 -999.990 1.413 ..P WKT 2011 04 12 12 11 55 31.3200 -97.3300 251.000 457.0 140.858 5.510 -999.990 -999.990 1.409 ..P WKT 2011 04 12 12 12 25 31.3200 -97.3300 251.000 457.0 138.692 4.230 -999.990 -999.990 1.387 ..P WKT 2011 04 12 12 12 55 31.3200 -97.3300 251.000 457.0 142.217 4.360 -999.990 -999.990 1.422 ..P WKT 2011 04 12 12 13 25 31.3200 -97.3300 251.000 457.0 142.227 4.150 -999.990 -999.990 1.422 ..P WKT 2011 04 12 12 13 55 31.3200 -97.3300 251.000 457.0 139.059 4.470 -999.990 -999.990 1.391 ..P WKT 2011 04 12 12 14 25 31.3200 -97.3300 251.000 457.0 138.567 4.120 -999.990 -999.990 1.386 ..P WKT 2011 04 12 12 14 55 31.3200 -97.3300 251.000 457.0 136.904 4.240 -999.990 -999.990 1.369 ..P WKT 2011 04 12 12 19 55 31.3200 -97.3300 251.000 30.0 148.052 4.460 -999.990 -999.990 1.481 ..P WKT 2011 04 12 12 24 55 31.3200 -97.3300 251.000 122.0 147.654 4.700 -999.990 -999.990 1.477 ..P WKT 2011 04 12 12 29 55 31.3200 -97.3300 251.000 457.0 140.394 4.690 -999.990 -999.990 1.404 ..P WKT 2011 04 12 12 34 55 31.3200 -97.3300 251.000 30.0 144.346 4.650 -999.990 -999.990 1.443 ..P WKT 2011 04 12 12 39 55 31.3200 -97.3300 251.000 122.0 147.295 4.010 -999.990 -999.990 1.473 ..P WKT 2011 04 12 12 44 55 31.3200 -97.3300 251.000 457.0 135.683 3.950 -999.990 -999.990 1.357 ..P WKT 2011 04 12 12 54 55 31.3200 -97.3300 251.000 30.0 142.516 4.220 -999.990 -999.990 1.425 ..P WKT 2011 04 12 12 59 55 31.3200 -97.3300 251.000 122.0 134.013 4.090 -999.990 -999.990 1.340 ..P WKT 2011 04 12 13 04 55 31.3200 -97.3300 251.000 457.0 141.916 5.680 -999.990 -999.990 1.419 ..P WKT 2011 04 12 13 09 55 31.3200 -97.3300 251.000 30.0 140.109 6.140 -999.990 -999.990 1.401 ..P WKT 2011 04 12 13 14 55 31.3200 -97.3300 251.000 122.0 134.284 4.730 -999.990 -999.990 1.343 ..P WKT 2011 04 12 13 19 55 31.3200 -97.3300 251.000 457.0 138.504 4.500 -999.990 -999.990 1.385 ..P WKT 2011 04 12 13 29 55 31.3200 -97.3300 251.000 30.0 138.716 4.490 -999.990 -999.990 1.387 ..P WKT 2011 04 12 13 34 55 31.3200 -97.3300 251.000 122.0 137.722 4.980 -999.990 -999.990 1.377 ..P WKT 2011 04 12 13 39 55 31.3200 -97.3300 251.000 457.0 142.420 5.430 -999.990 -999.990 1.424 ..P WKT 2011 04 12 13 44 55 31.3200 -97.3300 251.000 30.0 143.101 5.100 -999.990 -999.990 1.431 ..P WKT 2011 04 12 13 49 55 31.3200 -97.3300 251.000 122.0 143.447 5.060 -999.990 -999.990 1.434 ..P WKT 2011 04 12 13 54 55 31.3200 -97.3300 251.000 457.0 139.438 4.050 -999.990 -999.990 1.394 ..P WKT 2011 04 12 14 04 55 31.3200 -97.3300 251.000 30.0 147.353 4.300 -999.990 -999.990 1.474 ..P WKT 2011 04 12 14 09 55 31.3200 -97.3300 251.000 122.0 147.891 4.500 -999.990 -999.990 1.479 ..P WKT 2011 04 12 14 14 55 31.3200 -97.3300 251.000 457.0 146.083 4.800 -999.990 -999.990 1.461 ..P WKT 2011 04 12 14 19 55 31.3200 -97.3300 251.000 30.0 147.291 4.850 -999.990 -999.990 1.473 ..P WKT 2011 04 12 14 24 55 31.3200 -97.3300 251.000 122.0 149.168 4.500 -999.990 -999.990 1.492 ..P WKT 2011 04 12 14 29 55 31.3200 -97.3300 251.000 457.0 140.995 5.120 -999.990 -999.990 1.410 ..P WKT 2011 04 12 14 39 55 31.3200 -97.3300 251.000 30.0 148.267 4.430 -999.990 -999.990 1.483 ..P WKT 2011 04 12 14 44 55 31.3200 -97.3300 251.000 122.0 151.651 4.800 -999.990 -999.990 1.517 ..P WKT 2011 04 12 14 49 55 31.3200 -97.3300 251.000 457.0 139.961 4.090 -999.990 -999.990 1.400 ..P WKT 2011 04 12 14 54 55 31.3200 -97.3300 251.000 30.0 147.198 4.670 -999.990 -999.990 1.472 ..P WKT 2011 04 12 14 59 55 31.3200 -97.3300 251.000 122.0 143.714 4.290 -999.990 -999.990 1.437 ..P WKT 2011 04 12 15 04 55 31.3200 -97.3300 251.000 457.0 141.236 5.260 -999.990 -999.990 1.412 ..P WKT 2011 04 12 15 14 55 31.3200 -97.3300 251.000 30.0 147.480 3.990 -999.990 -999.990 1.475 ..P WKT 2011 04 12 15 19 55 31.3200 -97.3300 251.000 122.0 150.339 3.750 -999.990 -999.990 1.503 ..P WKT 2011 04 12 15 24 55 31.3200 -97.3300 251.000 457.0 137.281 4.440 -999.990 -999.990 1.373 ..P WKT 2011 04 12 15 29 55 31.3200 -97.3300 251.000 30.0 145.502 5.090 -999.990 -999.990 1.455 ..P WKT 2011 04 12 15 34 55 31.3200 -97.3300 251.000 122.0 151.210 5.320 -999.990 -999.990 1.512 ..P WKT 2011 04 12 15 39 55 31.3200 -97.3300 251.000 457.0 144.015 4.100 -999.990 -999.990 1.440 ..P WKT 2011 04 12 15 49 55 31.3200 -97.3300 251.000 30.0 152.344 4.570 -999.990 -999.990 1.523 ..P WKT 2011 04 12 15 54 55 31.3200 -97.3300 251.000 122.0 148.094 5.130 -999.990 -999.990 1.481 ..P WKT 2011 04 12 15 59 55 31.3200 -97.3300 251.000 457.0 151.887 5.110 -999.990 -999.990 1.519 ..P WKT 2011 04 12 16 04 55 31.3200 -97.3300 251.000 30.0 143.279 4.670 -999.990 -999.990 1.433 ..P WKT 2011 04 12 16 09 55 31.3200 -97.3300 251.000 122.0 142.547 5.100 -999.990 -999.990 1.425 ..P WKT 2011 04 12 16 14 55 31.3200 -97.3300 251.000 457.0 145.000 3.870 -999.990 -999.990 1.450 ..P WKT 2011 04 12 16 24 55 31.3200 -97.3300 251.000 30.0 142.531 3.920 -999.990 -999.990 1.425 ..P WKT 2011 04 12 16 29 55 31.3200 -97.3300 251.000 122.0 144.313 4.010 -999.990 -999.990 1.443 ..P WKT 2011 04 12 16 34 55 31.3200 -97.3300 251.000 457.0 141.403 4.860 -999.990 -999.990 1.414 ..P WKT 2011 04 12 16 39 55 31.3200 -97.3300 251.000 30.0 138.324 5.250 -999.990 -999.990 1.383 ..P WKT 2011 04 12 16 44 55 31.3200 -97.3300 251.000 122.0 139.604 4.980 -999.990 -999.990 1.396 ..P WKT 2011 04 12 16 49 55 31.3200 -97.3300 251.000 457.0 135.687 4.490 -999.990 -999.990 1.357 ..P WKT 2011 04 12 17 04 55 31.3200 -97.3300 251.000 30.0 140.592 4.990 -999.990 -999.990 1.406 ..P WKT 2011 04 12 17 09 55 31.3200 -97.3300 251.000 122.0 144.333 4.800 -999.990 -999.990 1.443 ..P WKT 2011 04 12 17 14 55 31.3200 -97.3300 251.000 457.0 137.008 5.370 -999.990 -999.990 1.370 ..P WKT 2011 04 12 17 19 55 31.3200 -97.3300 251.000 30.0 144.438 4.600 -999.990 -999.990 1.444 ..P WKT 2011 04 12 17 24 55 31.3200 -97.3300 251.000 122.0 140.467 4.630 -999.990 -999.990 1.405 ..P WKT 2011 04 12 17 29 55 31.3200 -97.3300 251.000 457.0 142.532 3.780 -999.990 -999.990 1.425 ..P WKT 2011 04 12 17 39 55 31.3200 -97.3300 251.000 30.0 140.918 4.690 -999.990 -999.990 1.409 ..P WKT 2011 04 12 17 44 55 31.3200 -97.3300 251.000 122.0 144.953 5.910 -999.990 -999.990 1.450 ..P WKT 2011 04 12 17 49 55 31.3200 -97.3300 251.000 457.0 147.647 5.020 -999.990 -999.990 1.476 ..P WKT 2011 04 12 17 54 55 31.3200 -97.3300 251.000 30.0 147.659 4.400 -999.990 -999.990 1.477 ..P WKT 2011 04 12 17 59 55 31.3200 -97.3300 251.000 122.0 144.315 3.650 -999.990 -999.990 1.443 ..P WKT 2011 04 12 18 04 55 31.3200 -97.3300 251.000 457.0 137.952 3.770 -999.990 -999.990 1.380 ..P WKT 2011 04 12 18 14 55 31.3200 -97.3300 251.000 30.0 143.364 4.490 -999.990 -999.990 1.434 ..P WKT 2011 04 12 18 19 55 31.3200 -97.3300 251.000 122.0 151.451 3.850 -999.990 -999.990 1.515 ..P WKT 2011 04 12 18 24 55 31.3200 -97.3300 251.000 457.0 144.105 3.740 -999.990 -999.990 1.441 ..P WKT 2011 04 12 18 29 55 31.3200 -97.3300 251.000 30.0 143.468 4.130 -999.990 -999.990 1.435 ..P WKT 2011 04 12 18 34 55 31.3200 -97.3300 251.000 122.0 142.832 3.920 -999.990 -999.990 1.428 ..P WKT 2011 04 12 18 39 55 31.3200 -97.3300 251.000 457.0 138.840 3.730 -999.990 -999.990 1.388 ..P WKT 2011 04 12 18 49 55 31.3200 -97.3300 251.000 30.0 144.661 4.280 -999.990 -999.990 1.447 ..P WKT 2011 04 12 18 54 55 31.3200 -97.3300 251.000 122.0 138.871 4.020 -999.990 -999.990 1.389 ..P WKT 2011 04 12 18 59 55 31.3200 -97.3300 251.000 457.0 137.948 4.400 -999.990 -999.990 1.379 ..P WKT 2011 04 12 19 04 55 31.3200 -97.3300 251.000 30.0 147.259 3.960 -999.990 -999.990 1.473 ..P WKT 2011 04 12 19 09 55 31.3200 -97.3300 251.000 122.0 144.824 4.500 -999.990 -999.990 1.448 ..P WKT 2011 04 12 19 14 55 31.3200 -97.3300 251.000 457.0 143.565 4.230 -999.990 -999.990 1.436 ..P WKT 2011 04 12 19 24 55 31.3200 -97.3300 251.000 30.0 148.117 4.440 -999.990 -999.990 1.481 ..P WKT 2011 04 12 19 29 55 31.3200 -97.3300 251.000 122.0 145.371 4.030 -999.990 -999.990 1.454 ..P WKT 2011 04 12 19 34 55 31.3200 -97.3300 251.000 457.0 140.275 3.800 -999.990 -999.990 1.403 ..P WKT 2011 04 12 19 39 55 31.3200 -97.3300 251.000 30.0 144.745 4.480 -999.990 -999.990 1.447 ..P WKT 2011 04 12 19 44 55 31.3200 -97.3300 251.000 122.0 141.998 4.060 -999.990 -999.990 1.420 ..P WKT 2011 04 12 19 49 55 31.3200 -97.3300 251.000 457.0 138.077 3.940 -999.990 -999.990 1.381 ..P WKT 2011 04 12 19 59 55 31.3200 -97.3300 251.000 30.0 141.598 3.850 -999.990 -999.990 1.416 ..P WKT 2011 04 12 20 04 55 31.3200 -97.3300 251.000 122.0 144.846 4.690 -999.990 -999.990 1.448 ..P WKT 2011 04 12 20 09 55 31.3200 -97.3300 251.000 457.0 146.080 4.410 -999.990 -999.990 1.461 ..P WKT 2011 04 12 20 14 55 31.3200 -97.3300 251.000 30.0 140.095 3.720 -999.990 -999.990 1.401 ..P WKT 2011 04 12 20 19 55 31.3200 -97.3300 251.000 122.0 138.811 4.030 -999.990 -999.990 1.388 ..P WKT 2011 04 12 20 24 55 31.3200 -97.3300 251.000 457.0 136.015 4.530 -999.990 -999.990 1.360 ..P WKT 2011 04 12 20 34 55 31.3200 -97.3300 251.000 30.0 139.897 5.800 -999.990 -999.990 1.399 ..P WKT 2011 04 12 20 39 55 31.3200 -97.3300 251.000 122.0 133.816 4.270 -999.990 -999.990 1.338 ..P WKT 2011 04 12 20 44 55 31.3200 -97.3300 251.000 457.0 139.823 4.150 -999.990 -999.990 1.398 ..P WKT 2011 04 12 20 49 55 31.3200 -97.3300 251.000 30.0 136.427 4.470 -999.990 -999.990 1.364 ..P WKT 2011 04 12 20 54 55 31.3200 -97.3300 251.000 122.0 140.084 4.730 -999.990 -999.990 1.401 ..P WKT 2011 04 12 20 59 55 31.3200 -97.3300 251.000 457.0 130.307 4.150 -999.990 -999.990 1.303 ..P WKT 2011 04 12 21 09 55 31.3200 -97.3300 251.000 30.0 142.610 4.190 -999.990 -999.990 1.426 ..P WKT 2011 04 12 21 14 55 31.3200 -97.3300 251.000 122.0 138.495 4.440 -999.990 -999.990 1.385 ..P WKT 2011 04 12 21 19 55 31.3200 -97.3300 251.000 457.0 142.776 4.290 -999.990 -999.990 1.428 ..P WKT 2011 04 12 21 24 55 31.3200 -97.3300 251.000 30.0 148.401 6.190 -999.990 -999.990 1.484 ..P WKT 2011 04 12 21 29 55 31.3200 -97.3300 251.000 122.0 144.621 4.490 -999.990 -999.990 1.446 ..P WKT 2011 04 12 21 34 55 31.3200 -97.3300 251.000 457.0 138.825 3.650 -999.990 -999.990 1.388 ..P WKT 2011 04 12 21 44 55 31.3200 -97.3300 251.000 30.0 138.462 3.770 -999.990 -999.990 1.385 ..P WKT 2011 04 12 21 49 55 31.3200 -97.3300 251.000 122.0 141.208 4.610 -999.990 -999.990 1.412 ..P WKT 2011 04 12 21 54 55 31.3200 -97.3300 251.000 457.0 136.899 4.880 -999.990 -999.990 1.369 ..P WKT 2011 04 12 21 59 55 31.3200 -97.3300 251.000 30.0 140.653 4.640 -999.990 -999.990 1.407 ..P WKT 2011 04 12 22 04 55 31.3200 -97.3300 251.000 122.0 143.064 3.710 -999.990 -999.990 1.431 ..P WKT 2011 04 12 22 09 55 31.3200 -97.3300 251.000 457.0 146.482 3.320 -999.990 -999.990 1.465 ..P WKT 2011 04 12 22 19 55 31.3200 -97.3300 251.000 30.0 138.440 5.420 -999.990 -999.990 1.384 ..P WKT 2011 04 12 22 24 55 31.3200 -97.3300 251.000 122.0 141.426 4.080 -999.990 -999.990 1.414 ..P WKT 2011 04 12 22 29 55 31.3200 -97.3300 251.000 457.0 137.356 3.740 -999.990 -999.990 1.374 ..P WKT 2011 04 12 22 34 55 31.3200 -97.3300 251.000 30.0 136.647 4.350 -999.990 -999.990 1.366 ..P WKT 2011 04 12 22 39 55 31.3200 -97.3300 251.000 122.0 135.264 5.000 -999.990 -999.990 1.353 ..P WKT 2011 04 12 22 44 55 31.3200 -97.3300 251.000 457.0 135.900 5.350 -999.990 -999.990 1.359 ..P WKT 2011 04 12 22 54 55 31.3200 -97.3300 251.000 30.0 143.939 5.680 -999.990 -999.990 1.439 ..P WKT 2011 04 12 22 59 55 31.3200 -97.3300 251.000 122.0 145.462 4.580 -999.990 -999.990 1.455 ..P WKT 2011 04 12 23 04 55 31.3200 -97.3300 251.000 457.0 141.943 4.580 -999.990 -999.990 1.419 ..P WKT 2011 04 12 23 09 55 31.3200 -97.3300 251.000 30.0 144.979 5.670 -999.990 -999.990 1.450 ..P WKT 2011 04 12 23 14 55 31.3200 -97.3300 251.000 122.0 148.519 5.180 -999.990 -999.990 1.485 ..P WKT 2011 04 12 23 19 55 31.3200 -97.3300 251.000 457.0 145.841 6.290 -999.990 -999.990 1.458 ..P WKT 2011 04 12 23 29 55 31.3200 -97.3300 251.000 30.0 137.878 4.710 -999.990 -999.990 1.379 ..P WKT 2011 04 12 23 34 55 31.3200 -97.3300 251.000 122.0 140.830 6.210 -999.990 -999.990 1.408 ..P WKT 2011 04 12 23 39 55 31.3200 -97.3300 251.000 457.0 140.757 5.450 -999.990 -999.990 1.408 ..P WKT 2011 04 12 23 44 55 31.3200 -97.3300 251.000 30.0 141.187 4.530 -999.990 -999.990 1.412 ..P WKT 2011 04 12 23 49 55 31.3200 -97.3300 251.000 122.0 144.476 5.080 -999.990 -999.990 1.445 ..P WKT 2011 04 13 00 09 55 31.3200 -97.3300 251.000 457.0 141.518 3.660 -999.990 -999.990 1.415 ..P WKT 2011 04 13 00 10 25 31.3200 -97.3300 251.000 457.0 141.907 3.790 -999.990 -999.990 1.419 ..P WKT 2011 04 13 00 10 55 31.3200 -97.3300 251.000 457.0 141.286 3.800 -999.990 -999.990 1.413 ..P WKT 2011 04 13 00 11 25 31.3200 -97.3300 251.000 457.0 141.505 3.710 -999.990 -999.990 1.415 ..P WKT 2011 04 13 00 11 55 31.3200 -97.3300 251.000 457.0 142.566 3.660 -999.990 -999.990 1.426 ..P WKT 2011 04 13 00 12 25 31.3200 -97.3300 251.000 457.0 143.289 4.260 -999.990 -999.990 1.433 ..P WKT 2011 04 13 00 12 55 31.3200 -97.3300 251.000 457.0 146.198 3.610 -999.990 -999.990 1.462 ..P WKT 2011 04 13 00 13 25 31.3200 -97.3300 251.000 457.0 146.417 3.530 -999.990 -999.990 1.464 ..P WKT 2011 04 13 00 13 55 31.3200 -97.3300 251.000 457.0 143.611 4.750 -999.990 -999.990 1.436 ..P WKT 2011 04 13 00 14 25 31.3200 -97.3300 251.000 457.0 143.495 4.050 -999.990 -999.990 1.435 ..P WKT 2011 04 13 00 14 55 31.3200 -97.3300 251.000 457.0 138.168 3.730 -999.990 -999.990 1.382 ..P WKT 2011 04 13 00 19 55 31.3200 -97.3300 251.000 30.0 142.548 4.970 -999.990 -999.990 1.425 ..P WKT 2011 04 13 00 24 55 31.3200 -97.3300 251.000 122.0 144.743 3.900 -999.990 -999.990 1.447 ..P WKT 2011 04 13 00 29 55 31.3200 -97.3300 251.000 457.0 141.561 4.320 -999.990 -999.990 1.416 ..P WKT 2011 04 13 00 34 55 31.3200 -97.3300 251.000 30.0 145.436 4.640 -999.990 -999.990 1.454 ..P WKT 2011 04 13 00 39 55 31.3200 -97.3300 251.000 122.0 143.766 3.840 -999.990 -999.990 1.438 ..P WKT 2011 04 13 00 44 55 31.3200 -97.3300 251.000 457.0 141.257 3.580 -999.990 -999.990 1.413 ..P WKT 2011 04 13 00 54 55 31.3200 -97.3300 251.000 30.0 146.304 3.490 -999.990 -999.990 1.463 ..P WKT 2011 04 13 00 59 55 31.3200 -97.3300 251.000 122.0 150.834 3.400 -999.990 -999.990 1.508 ..P WKT 2011 04 13 01 04 55 31.3200 -97.3300 251.000 457.0 143.274 3.430 -999.990 -999.990 1.433 ..P WKT 2011 04 13 01 09 55 31.3200 -97.3300 251.000 30.0 145.118 3.330 -999.990 -999.990 1.451 ..P WKT 2011 04 13 01 14 55 31.3200 -97.3300 251.000 122.0 144.948 3.260 -999.990 -999.990 1.449 ..P WKT 2011 04 13 01 19 55 31.3200 -97.3300 251.000 457.0 145.448 3.290 -999.990 -999.990 1.454 ..P WKT 2011 04 13 01 29 55 31.3200 -97.3300 251.000 30.0 144.195 3.960 -999.990 -999.990 1.442 ..P WKT 2011 04 13 01 34 55 31.3200 -97.3300 251.000 122.0 147.813 4.480 -999.990 -999.990 1.478 ..P WKT 2011 04 13 01 39 55 31.3200 -97.3300 251.000 457.0 146.059 3.570 -999.990 -999.990 1.461 ..P WKT 2011 04 13 01 44 55 31.3200 -97.3300 251.000 30.0 142.628 4.270 -999.990 -999.990 1.426 ..P WKT 2011 04 13 01 49 55 31.3200 -97.3300 251.000 122.0 145.909 4.210 -999.990 -999.990 1.459 ..P WKT 2011 04 13 01 54 55 31.3200 -97.3300 251.000 457.0 156.908 4.490 -999.990 -999.990 1.569 ..P WKT 2011 04 13 02 04 55 31.3200 -97.3300 251.000 30.0 148.176 4.320 -999.990 -999.990 1.482 ..P WKT 2011 04 13 02 09 55 31.3200 -97.3300 251.000 122.0 151.599 4.880 -999.990 -999.990 1.516 ..P WKT 2011 04 13 02 14 55 31.3200 -97.3300 251.000 457.0 150.996 3.800 -999.990 -999.990 1.510 ..P WKT 2011 04 13 02 19 55 31.3200 -97.3300 251.000 30.0 147.040 4.070 -999.990 -999.990 1.470 ..P WKT 2011 04 13 02 24 55 31.3200 -97.3300 251.000 122.0 148.450 3.980 -999.990 -999.990 1.484 ..P WKT 2011 04 13 02 29 55 31.3200 -97.3300 251.000 457.0 145.501 3.730 -999.990 -999.990 1.455 ..P WKT 2011 04 13 02 39 55 31.3200 -97.3300 251.000 30.0 148.153 4.430 -999.990 -999.990 1.482 ..P WKT 2011 04 13 02 44 55 31.3200 -97.3300 251.000 122.0 148.221 3.710 -999.990 -999.990 1.482 ..P WKT 2011 04 13 02 49 55 31.3200 -97.3300 251.000 457.0 145.776 5.280 -999.990 -999.990 1.458 ..P WKT 2011 04 13 02 54 55 31.3200 -97.3300 251.000 30.0 146.515 3.520 -999.990 -999.990 1.465 ..P WKT 2011 04 13 02 59 55 31.3200 -97.3300 251.000 122.0 144.405 4.780 -999.990 -999.990 1.444 ..P WKT 2011 04 13 03 04 55 31.3200 -97.3300 251.000 457.0 143.302 4.540 -999.990 -999.990 1.433 ..P WKT 2011 04 13 03 14 55 31.3200 -97.3300 251.000 30.0 146.072 3.870 -999.990 -999.990 1.461 ..P WKT 2011 04 13 03 19 55 31.3200 -97.3300 251.000 122.0 136.209 3.950 -999.990 -999.990 1.362 ..P WKT 2011 04 13 03 24 55 31.3200 -97.3300 251.000 457.0 137.068 3.890 -999.990 -999.990 1.371 ..P WKT 2011 04 13 03 29 55 31.3200 -97.3300 251.000 30.0 144.794 4.620 -999.990 -999.990 1.448 ..P WKT 2011 04 13 03 34 55 31.3200 -97.3300 251.000 122.0 143.475 4.740 -999.990 -999.990 1.435 ..P WKT 2011 04 13 03 39 55 31.3200 -97.3300 251.000 457.0 137.803 4.000 -999.990 -999.990 1.378 ..P WKT 2011 04 13 03 49 55 31.3200 -97.3300 251.000 30.0 150.737 4.020 -999.990 -999.990 1.507 ..P WKT 2011 04 13 03 54 55 31.3200 -97.3300 251.000 122.0 141.718 5.100 -999.990 -999.990 1.417 ..P WKT 2011 04 13 03 59 55 31.3200 -97.3300 251.000 457.0 138.893 4.480 -999.990 -999.990 1.389 ..P WKT 2011 04 13 04 04 55 31.3200 -97.3300 251.000 30.0 146.615 4.160 -999.990 -999.990 1.466 ..P WKT 2011 04 13 04 09 55 31.3200 -97.3300 251.000 122.0 144.460 4.070 -999.990 -999.990 1.445 ..P WKT 2011 04 13 04 14 55 31.3200 -97.3300 251.000 457.0 144.480 4.690 -999.990 -999.990 1.445 ..P WKT 2011 04 13 04 24 55 31.3200 -97.3300 251.000 30.0 152.984 4.920 -999.990 -999.990 1.530 ..P WKT 2011 04 13 04 29 55 31.3200 -97.3300 251.000 122.0 146.407 4.100 -999.990 -999.990 1.464 ..P WKT 2011 04 13 04 34 55 31.3200 -97.3300 251.000 457.0 152.044 4.250 -999.990 -999.990 1.520 ..P WKT 2011 04 13 04 39 55 31.3200 -97.3300 251.000 30.0 148.479 5.110 -999.990 -999.990 1.485 ..P WKT 2011 04 13 04 44 55 31.3200 -97.3300 251.000 122.0 151.606 4.700 -999.990 -999.990 1.516 ..P WKT 2011 04 13 04 49 55 31.3200 -97.3300 251.000 457.0 152.391 4.540 -999.990 -999.990 1.524 ..P WKT 2011 04 13 05 04 55 31.3200 -97.3300 251.000 30.0 149.442 4.150 -999.990 -999.990 1.494 ..P WKT 2011 04 13 05 09 55 31.3200 -97.3300 251.000 122.0 155.767 4.320 -999.990 -999.990 1.558 ..P WKT 2011 04 13 05 14 55 31.3200 -97.3300 251.000 457.0 146.044 5.320 -999.990 -999.990 1.460 ..P WKT 2011 04 13 05 19 55 31.3200 -97.3300 251.000 30.0 150.363 5.510 -999.990 -999.990 1.504 ..P WKT 2011 04 13 05 24 55 31.3200 -97.3300 251.000 122.0 158.024 5.350 -999.990 -999.990 1.580 ..P WKT 2011 04 13 05 29 55 31.3200 -97.3300 251.000 457.0 154.987 4.340 -999.990 -999.990 1.550 ..P WKT 2011 04 13 05 39 55 31.3200 -97.3300 251.000 30.0 151.590 5.230 -999.990 -999.990 1.516 ..P WKT 2011 04 13 05 44 55 31.3200 -97.3300 251.000 122.0 156.909 4.330 -999.990 -999.990 1.569 ..P WKT 2011 04 13 05 49 55 31.3200 -97.3300 251.000 457.0 150.867 5.020 -999.990 -999.990 1.509 ..P WKT 2011 04 13 05 54 55 31.3200 -97.3300 251.000 30.0 151.508 4.820 -999.990 -999.990 1.515 ..P WKT 2011 04 13 05 59 55 31.3200 -97.3300 251.000 122.0 154.152 4.980 -999.990 -999.990 1.542 ..P WKT 2011 04 13 06 04 55 31.3200 -97.3300 251.000 457.0 147.778 5.230 -999.990 -999.990 1.478 ..P WKT 2011 04 13 06 14 55 31.3200 -97.3300 251.000 30.0 147.390 4.180 -999.990 -999.990 1.474 ..P WKT 2011 04 13 06 19 55 31.3200 -97.3300 251.000 122.0 148.365 4.580 -999.990 -999.990 1.484 ..P WKT 2011 04 13 06 24 55 31.3200 -97.3300 251.000 457.0 151.343 5.460 -999.990 -999.990 1.513 ..P WKT 2011 04 13 06 29 55 31.3200 -97.3300 251.000 30.0 151.983 4.880 -999.990 -999.990 1.520 ..P WKT 2011 04 13 06 34 55 31.3200 -97.3300 251.000 122.0 148.283 4.510 -999.990 -999.990 1.483 ..P WKT 2011 04 13 06 39 55 31.3200 -97.3300 251.000 457.0 153.931 5.230 -999.990 -999.990 1.539 ..P WKT 2011 04 13 06 49 55 31.3200 -97.3300 251.000 30.0 143.840 4.430 -999.990 -999.990 1.438 ..P WKT 2011 04 13 06 54 55 31.3200 -97.3300 251.000 122.0 150.630 5.690 -999.990 -999.990 1.506 ..P WKT 2011 04 13 06 59 55 31.3200 -97.3300 251.000 457.0 150.746 5.660 -999.990 -999.990 1.507 ..P WKT 2011 04 13 07 04 55 31.3200 -97.3300 251.000 30.0 143.688 4.870 -999.990 -999.990 1.437 ..P WKT 2011 04 13 07 09 55 31.3200 -97.3300 251.000 122.0 146.473 4.750 -999.990 -999.990 1.465 ..P WKT 2011 04 13 07 14 55 31.3200 -97.3300 251.000 457.0 154.929 5.950 -999.990 -999.990 1.549 ..P WKT 2011 04 13 07 24 55 31.3200 -97.3300 251.000 30.0 141.008 4.500 -999.990 -999.990 1.410 ..P WKT 2011 04 13 07 29 55 31.3200 -97.3300 251.000 122.0 146.651 5.030 -999.990 -999.990 1.467 ..P WKT 2011 04 13 07 34 55 31.3200 -97.3300 251.000 457.0 157.628 5.030 -999.990 -999.990 1.576 ..P WKT 2011 04 13 07 39 55 31.3200 -97.3300 251.000 30.0 147.930 5.260 -999.990 -999.990 1.479 ..P WKT 2011 04 13 07 44 55 31.3200 -97.3300 251.000 122.0 153.238 5.150 -999.990 -999.990 1.532 ..P WKT 2011 04 13 07 49 55 31.3200 -97.3300 251.000 457.0 160.877 4.510 -999.990 -999.990 1.609 ..P WKT 2011 04 13 07 59 55 31.3200 -97.3300 251.000 30.0 148.393 4.290 -999.990 -999.990 1.484 ..P WKT 2011 04 13 08 04 55 31.3200 -97.3300 251.000 122.0 149.271 5.020 -999.990 -999.990 1.493 ..P WKT 2011 04 13 08 09 55 31.3200 -97.3300 251.000 457.0 165.311 4.600 -999.990 -999.990 1.653 ..P WKT 2011 04 13 08 14 55 31.3200 -97.3300 251.000 30.0 153.691 4.650 -999.990 -999.990 1.537 ..P WKT 2011 04 13 08 19 55 31.3200 -97.3300 251.000 122.0 154.067 4.530 -999.990 -999.990 1.541 ..P WKT 2011 04 13 08 24 55 31.3200 -97.3300 251.000 457.0 172.101 4.750 -999.990 -999.990 1.721 ..P WKT 2011 04 13 08 34 55 31.3200 -97.3300 251.000 30.0 149.202 4.600 -999.990 -999.990 1.492 ..P WKT 2011 04 13 08 39 55 31.3200 -97.3300 251.000 122.0 155.908 5.090 -999.990 -999.990 1.559 ..P WKT 2011 04 13 08 44 55 31.3200 -97.3300 251.000 457.0 178.930 5.910 -999.990 -999.990 1.789 ..P WKT 2011 04 13 08 49 55 31.3200 -97.3300 251.000 30.0 151.000 4.840 -999.990 -999.990 1.510 ..P WKT 2011 04 13 08 54 55 31.3200 -97.3300 251.000 122.0 152.043 4.930 -999.990 -999.990 1.520 ..P WKT 2011 04 13 08 59 55 31.3200 -97.3300 251.000 457.0 175.392 5.370 -999.990 -999.990 1.754 ..P WKT 2011 04 13 09 09 55 31.3200 -97.3300 251.000 30.0 150.772 5.280 -999.990 -999.990 1.508 ..P WKT 2011 04 13 09 14 55 31.3200 -97.3300 251.000 122.0 156.402 4.880 -999.990 -999.990 1.564 ..P WKT 2011 04 13 09 19 55 31.3200 -97.3300 251.000 457.0 183.000 4.990 -999.990 -999.990 1.830 ..P WKT 2011 04 13 09 24 55 31.3200 -97.3300 251.000 30.0 153.352 5.020 -999.990 -999.990 1.534 ..P WKT 2011 04 13 09 29 55 31.3200 -97.3300 251.000 122.0 153.324 4.930 -999.990 -999.990 1.533 ..P WKT 2011 04 13 09 34 55 31.3200 -97.3300 251.000 457.0 183.907 5.610 -999.990 -999.990 1.839 ..P WKT 2011 04 13 09 44 55 31.3200 -97.3300 251.000 30.0 149.440 5.530 -999.990 -999.990 1.494 ..P WKT 2011 04 13 09 49 55 31.3200 -97.3300 251.000 122.0 147.940 5.270 -999.990 -999.990 1.479 ..P WKT 2011 04 13 09 54 55 31.3200 -97.3300 251.000 457.0 181.695 5.460 -999.990 -999.990 1.817 ..P WKT 2011 04 13 09 59 55 31.3200 -97.3300 251.000 30.0 144.275 5.590 -999.990 -999.990 1.443 ..P WKT 2011 04 13 10 04 55 31.3200 -97.3300 251.000 122.0 152.087 6.550 -999.990 -999.990 1.521 ..P WKT 2011 04 13 10 09 55 31.3200 -97.3300 251.000 457.0 180.512 5.840 -999.990 -999.990 1.805 ..P WKT 2011 04 13 10 19 55 31.3200 -97.3300 251.000 30.0 149.796 5.880 -999.990 -999.990 1.498 ..P WKT 2011 04 13 10 24 55 31.3200 -97.3300 251.000 122.0 149.507 5.930 -999.990 -999.990 1.495 ..P WKT 2011 04 13 10 29 55 31.3200 -97.3300 251.000 457.0 189.604 5.450 -999.990 -999.990 1.896 ..P WKT 2011 04 13 10 34 55 31.3200 -97.3300 251.000 30.0 138.961 6.900 -999.990 -999.990 1.390 ..P WKT 2011 04 13 10 39 55 31.3200 -97.3300 251.000 122.0 152.298 5.280 -999.990 -999.990 1.523 ..P WKT 2011 04 13 10 44 55 31.3200 -97.3300 251.000 457.0 175.435 5.000 -999.990 -999.990 1.754 ..P WKT 2011 04 13 10 54 55 31.3200 -97.3300 251.000 30.0 137.289 5.330 -999.990 -999.990 1.373 ..P WKT 2011 04 13 10 59 55 31.3200 -97.3300 251.000 122.0 149.104 5.720 -999.990 -999.990 1.491 ..P WKT 2011 04 13 11 04 55 31.3200 -97.3300 251.000 457.0 199.280 6.090 -999.990 -999.990 1.993 ..P WKT 2011 04 13 11 09 55 31.3200 -97.3300 251.000 30.0 137.520 7.130 -999.990 -999.990 1.375 ..P WKT 2011 04 13 11 14 55 31.3200 -97.3300 251.000 122.0 148.334 6.130 -999.990 -999.990 1.483 ..P WKT 2011 04 13 11 19 55 31.3200 -97.3300 251.000 457.0 168.943 5.820 -999.990 -999.990 1.689 ..P WKT 2011 04 13 11 29 55 31.3200 -97.3300 251.000 30.0 158.247 6.460 -999.990 -999.990 1.582 ..P WKT 2011 04 13 11 34 55 31.3200 -97.3300 251.000 122.0 145.043 5.930 -999.990 -999.990 1.450 ..P WKT 2011 04 13 11 39 55 31.3200 -97.3300 251.000 457.0 166.199 8.230 -999.990 -999.990 1.662 ..P WKT 2011 04 13 11 44 55 31.3200 -97.3300 251.000 30.0 150.175 7.370 -999.990 -999.990 1.502 ..P WKT 2011 04 13 11 49 55 31.3200 -97.3300 251.000 122.0 147.431 6.500 -999.990 -999.990 1.474 ..P WKT 2011 04 13 12 09 55 31.3200 -97.3300 251.000 457.0 189.090 5.910 -999.990 -999.990 1.891 ..P WKT 2011 04 13 12 10 25 31.3200 -97.3300 251.000 457.0 192.261 6.030 -999.990 -999.990 1.923 ..P WKT 2011 04 13 12 10 55 31.3200 -97.3300 251.000 457.0 185.643 5.760 -999.990 -999.990 1.856 ..P WKT 2011 04 13 12 11 25 31.3200 -97.3300 251.000 457.0 185.993 5.740 -999.990 -999.990 1.860 ..P WKT 2011 04 13 12 11 55 31.3200 -97.3300 251.000 457.0 181.364 6.020 -999.990 -999.990 1.814 ..P WKT 2011 04 13 12 12 25 31.3200 -97.3300 251.000 457.0 182.379 6.390 -999.990 -999.990 1.824 ..P WKT 2011 04 13 12 12 55 31.3200 -97.3300 251.000 457.0 187.874 5.890 -999.990 -999.990 1.879 ..P WKT 2011 04 13 12 13 25 31.3200 -97.3300 251.000 457.0 183.080 6.290 -999.990 -999.990 1.831 ..P WKT 2011 04 13 12 13 55 31.3200 -97.3300 251.000 457.0 178.120 5.660 -999.990 -999.990 1.781 ..P WKT 2011 04 13 12 14 25 31.3200 -97.3300 251.000 457.0 180.296 5.910 -999.990 -999.990 1.803 ..P WKT 2011 04 13 12 14 55 31.3200 -97.3300 251.000 457.0 186.123 5.940 -999.990 -999.990 1.861 ..P WKT 2011 04 13 12 19 55 31.3200 -97.3300 251.000 30.0 161.245 5.730 -999.990 -999.990 1.612 ..P WKT 2011 04 13 12 24 55 31.3200 -97.3300 251.000 122.0 158.606 5.650 -999.990 -999.990 1.586 ..P WKT 2011 04 13 12 29 55 31.3200 -97.3300 251.000 457.0 180.705 5.560 -999.990 -999.990 1.807 ..P WKT 2011 04 13 12 34 55 31.3200 -97.3300 251.000 30.0 151.997 5.440 -999.990 -999.990 1.520 ..P WKT 2011 04 13 12 39 55 31.3200 -97.3300 251.000 122.0 151.183 5.590 -999.990 -999.990 1.512 ..P WKT 2011 04 13 12 44 55 31.3200 -97.3300 251.000 457.0 178.604 6.210 -999.990 -999.990 1.786 ..P WKT 2011 04 13 12 54 55 31.3200 -97.3300 251.000 30.0 148.828 5.240 -999.990 -999.990 1.488 ..P WKT 2011 04 13 12 59 55 31.3200 -97.3300 251.000 122.0 165.715 5.250 -999.990 -999.990 1.657 ..P WKT 2011 04 13 13 04 55 31.3200 -97.3300 251.000 457.0 176.292 5.970 -999.990 -999.990 1.763 ..P WKT 2011 04 13 13 09 55 31.3200 -97.3300 251.000 30.0 146.651 5.500 -999.990 -999.990 1.467 ..P WKT 2011 04 13 13 14 55 31.3200 -97.3300 251.000 122.0 164.542 5.260 -999.990 -999.990 1.645 ..P WKT 2011 04 13 13 19 55 31.3200 -97.3300 251.000 457.0 173.128 5.070 -999.990 -999.990 1.731 ..P WKT 2011 04 13 13 29 55 31.3200 -97.3300 251.000 30.0 146.549 4.710 -999.990 -999.990 1.465 ..P WKT 2011 04 13 13 34 55 31.3200 -97.3300 251.000 122.0 137.317 5.380 -999.990 -999.990 1.373 ..P WKT 2011 04 13 13 39 55 31.3200 -97.3300 251.000 457.0 165.008 6.790 -999.990 -999.990 1.650 ..P WKT 2011 04 13 13 44 55 31.3200 -97.3300 251.000 30.0 148.456 5.080 -999.990 -999.990 1.485 ..P WKT 2011 04 13 13 49 55 31.3200 -97.3300 251.000 122.0 144.212 5.280 -999.990 -999.990 1.442 ..P WKT 2011 04 13 13 54 55 31.3200 -97.3300 251.000 457.0 150.949 5.410 -999.990 -999.990 1.509 ..P WKT 2011 04 13 14 04 55 31.3200 -97.3300 251.000 30.0 148.949 5.490 -999.990 -999.990 1.489 ..P WKT 2011 04 13 14 09 55 31.3200 -97.3300 251.000 122.0 145.868 5.690 -999.990 -999.990 1.459 ..P WKT 2011 04 13 14 14 55 31.3200 -97.3300 251.000 457.0 145.783 5.420 -999.990 -999.990 1.458 ..P WKT 2011 04 13 14 19 55 31.3200 -97.3300 251.000 30.0 147.029 5.190 -999.990 -999.990 1.470 ..P WKT 2011 04 13 14 24 55 31.3200 -97.3300 251.000 122.0 148.942 5.300 -999.990 -999.990 1.489 ..P WKT 2011 04 13 14 29 55 31.3200 -97.3300 251.000 457.0 136.367 5.480 -999.990 -999.990 1.364 ..P WKT 2011 04 13 14 39 55 31.3200 -97.3300 251.000 30.0 149.711 5.500 -999.990 -999.990 1.497 ..P WKT 2011 04 13 14 44 55 31.3200 -97.3300 251.000 122.0 147.484 5.520 -999.990 -999.990 1.475 ..P WKT 2011 04 13 14 49 55 31.3200 -97.3300 251.000 457.0 135.425 5.370 -999.990 -999.990 1.354 ..P WKT 2011 04 13 14 54 55 31.3200 -97.3300 251.000 30.0 145.029 6.260 -999.990 -999.990 1.450 ..P WKT 2011 04 13 14 59 55 31.3200 -97.3300 251.000 122.0 142.800 5.830 -999.990 -999.990 1.428 ..P WKT 2011 04 13 15 04 55 31.3200 -97.3300 251.000 457.0 133.071 5.110 -999.990 -999.990 1.331 ..P WKT 2011 04 13 15 14 55 31.3200 -97.3300 251.000 30.0 149.070 5.400 -999.990 -999.990 1.491 ..P WKT 2011 04 13 15 19 55 31.3200 -97.3300 251.000 122.0 153.463 6.120 -999.990 -999.990 1.535 ..P WKT 2011 04 13 15 24 55 31.3200 -97.3300 251.000 457.0 143.683 6.380 -999.990 -999.990 1.437 ..P WKT 2011 04 13 15 29 55 31.3200 -97.3300 251.000 30.0 150.411 5.230 -999.990 -999.990 1.504 ..P WKT 2011 04 13 15 34 55 31.3200 -97.3300 251.000 122.0 150.136 5.140 -999.990 -999.990 1.501 ..P WKT 2011 04 13 15 39 55 31.3200 -97.3300 251.000 457.0 146.190 4.930 -999.990 -999.990 1.462 ..P WKT 2011 04 13 15 49 55 31.3200 -97.3300 251.000 30.0 152.981 4.550 -999.990 -999.990 1.530 ..P WKT 2011 04 13 15 54 55 31.3200 -97.3300 251.000 122.0 153.206 5.030 -999.990 -999.990 1.532 ..P WKT 2011 04 13 15 59 55 31.3200 -97.3300 251.000 457.0 151.595 4.970 -999.990 -999.990 1.516 ..P WKT 2011 04 13 16 04 55 31.3200 -97.3300 251.000 30.0 154.993 4.360 -999.990 -999.990 1.550 ..P WKT 2011 04 13 16 09 55 31.3200 -97.3300 251.000 122.0 159.058 4.560 -999.990 -999.990 1.591 ..P WKT 2011 04 13 16 14 55 31.3200 -97.3300 251.000 457.0 144.423 4.630 -999.990 -999.990 1.444 ..P WKT 2011 04 13 16 24 55 31.3200 -97.3300 251.000 30.0 153.081 4.030 -999.990 -999.990 1.531 ..P WKT 2011 04 13 16 29 55 31.3200 -97.3300 251.000 122.0 149.153 4.060 -999.990 -999.990 1.492 ..P WKT 2011 04 13 16 34 55 31.3200 -97.3300 251.000 457.0 139.879 5.060 -999.990 -999.990 1.399 ..P WKT 2011 04 13 16 39 55 31.3200 -97.3300 251.000 30.0 152.993 4.560 -999.990 -999.990 1.530 ..P WKT 2011 04 13 16 44 55 31.3200 -97.3300 251.000 122.0 155.082 6.230 -999.990 -999.990 1.551 ..P WKT 2011 04 13 16 49 55 31.3200 -97.3300 251.000 457.0 153.158 4.560 -999.990 -999.990 1.532 ..P WKT 2011 04 13 17 04 55 31.3200 -97.3300 251.000 30.0 159.079 4.220 -999.990 -999.990 1.591 ..P WKT 2011 04 13 17 09 55 31.3200 -97.3300 251.000 122.0 156.314 4.820 -999.990 -999.990 1.563 ..P WKT 2011 04 13 17 14 55 31.3200 -97.3300 251.000 457.0 158.231 5.460 -999.990 -999.990 1.582 ..P WKT 2011 04 13 17 19 55 31.3200 -97.3300 251.000 30.0 159.813 5.310 -999.990 -999.990 1.598 ..P WKT 2011 04 13 17 24 55 31.3200 -97.3300 251.000 122.0 156.377 4.820 -999.990 -999.990 1.564 ..P WKT 2011 04 13 17 29 55 31.3200 -97.3300 251.000 457.0 155.283 4.610 -999.990 -999.990 1.553 ..P WKT 2011 04 13 17 39 55 31.3200 -97.3300 251.000 30.0 166.656 4.180 -999.990 -999.990 1.667 ..P WKT 2011 04 13 17 44 55 31.3200 -97.3300 251.000 122.0 157.702 4.730 -999.990 -999.990 1.577 ..P WKT 2011 04 13 17 49 55 31.3200 -97.3300 251.000 457.0 159.459 5.870 -999.990 -999.990 1.595 ..P WKT 2011 04 13 17 54 55 31.3200 -97.3300 251.000 30.0 162.890 4.550 -999.990 -999.990 1.629 ..P WKT 2011 04 13 17 59 55 31.3200 -97.3300 251.000 122.0 161.635 5.860 -999.990 -999.990 1.616 ..P WKT 2011 04 13 18 04 55 31.3200 -97.3300 251.000 457.0 155.020 4.030 -999.990 -999.990 1.550 ..P WKT 2011 04 13 18 14 55 31.3200 -97.3300 251.000 30.0 164.639 4.710 -999.990 -999.990 1.646 ..P WKT 2011 04 13 18 19 55 31.3200 -97.3300 251.000 122.0 159.769 4.080 -999.990 -999.990 1.598 ..P WKT 2011 04 13 18 24 55 31.3200 -97.3300 251.000 457.0 160.427 4.840 -999.990 -999.990 1.604 ..P WKT 2011 04 13 18 29 55 31.3200 -97.3300 251.000 30.0 158.739 4.810 -999.990 -999.990 1.587 ..P WKT 2011 04 13 18 34 55 31.3200 -97.3300 251.000 122.0 158.727 4.510 -999.990 -999.990 1.587 ..P WKT 2011 04 13 18 39 55 31.3200 -97.3300 251.000 457.0 157.877 4.640 -999.990 -999.990 1.579 ..P WKT 2011 04 13 18 49 55 31.3200 -97.3300 251.000 30.0 158.139 4.870 -999.990 -999.990 1.581 ..P WKT 2011 04 13 18 54 55 31.3200 -97.3300 251.000 122.0 162.271 4.590 -999.990 -999.990 1.623 ..P WKT 2011 04 13 18 59 55 31.3200 -97.3300 251.000 457.0 159.695 4.620 -999.990 -999.990 1.597 ..P WKT 2011 04 13 19 04 55 31.3200 -97.3300 251.000 30.0 165.170 4.580 -999.990 -999.990 1.652 ..P WKT 2011 04 13 19 09 55 31.3200 -97.3300 251.000 122.0 162.595 4.770 -999.990 -999.990 1.626 ..P WKT 2011 04 13 19 14 55 31.3200 -97.3300 251.000 457.0 164.213 4.850 -999.990 -999.990 1.642 ..P WKT 2011 04 13 19 24 55 31.3200 -97.3300 251.000 30.0 163.614 4.770 -999.990 -999.990 1.636 ..P WKT 2011 04 13 19 29 55 31.3200 -97.3300 251.000 122.0 165.760 4.500 -999.990 -999.990 1.658 ..P WKT 2011 04 13 19 34 55 31.3200 -97.3300 251.000 457.0 164.549 4.660 -999.990 -999.990 1.645 ..P WKT 2011 04 13 19 39 55 31.3200 -97.3300 251.000 30.0 157.464 4.320 -999.990 -999.990 1.575 ..P WKT 2011 04 13 19 44 55 31.3200 -97.3300 251.000 122.0 167.332 4.240 -999.990 -999.990 1.673 ..P WKT 2011 04 13 19 49 55 31.3200 -97.3300 251.000 457.0 164.611 4.270 -999.990 -999.990 1.646 ..P WKT 2011 04 13 19 59 55 31.3200 -97.3300 251.000 30.0 165.019 4.250 -999.990 -999.990 1.650 ..P WKT 2011 04 13 20 04 55 31.3200 -97.3300 251.000 122.0 167.815 4.270 -999.990 -999.990 1.678 ..P WKT 2011 04 13 20 09 55 31.3200 -97.3300 251.000 457.0 169.435 4.960 -999.990 -999.990 1.694 ..P WKT 2011 04 13 20 14 55 31.3200 -97.3300 251.000 30.0 167.864 4.540 -999.990 -999.990 1.679 ..P WKT 2011 04 13 20 19 55 31.3200 -97.3300 251.000 122.0 173.518 4.230 -999.990 -999.990 1.735 ..P WKT 2011 04 13 20 24 55 31.3200 -97.3300 251.000 457.0 164.049 4.800 -999.990 -999.990 1.640 ..P WKT 2011 04 13 20 34 55 31.3200 -97.3300 251.000 30.0 165.922 4.260 -999.990 -999.990 1.659 ..P WKT 2011 04 13 20 39 55 31.3200 -97.3300 251.000 122.0 171.724 4.080 -999.990 -999.990 1.717 ..P WKT 2011 04 13 20 44 55 31.3200 -97.3300 251.000 457.0 164.410 4.080 -999.990 -999.990 1.644 ..P WKT 2011 04 13 20 49 55 31.3200 -97.3300 251.000 30.0 164.159 5.250 -999.990 -999.990 1.642 ..P WKT 2011 04 13 20 54 55 31.3200 -97.3300 251.000 122.0 170.634 4.160 -999.990 -999.990 1.706 ..P WKT 2011 04 13 20 59 55 31.3200 -97.3300 251.000 457.0 165.673 4.020 -999.990 -999.990 1.657 ..P WKT 2011 04 13 21 09 55 31.3200 -97.3300 251.000 30.0 169.833 3.570 -999.990 -999.990 1.698 ..P WKT 2011 04 13 21 14 55 31.3200 -97.3300 251.000 122.0 170.206 4.120 -999.990 -999.990 1.702 ..P WKT 2011 04 13 21 19 55 31.3200 -97.3300 251.000 457.0 170.580 4.530 -999.990 -999.990 1.706 ..P WKT 2011 04 13 21 24 55 31.3200 -97.3300 251.000 30.0 176.003 5.500 -999.990 -999.990 1.760 ..P WKT 2011 04 13 21 29 55 31.3200 -97.3300 251.000 122.0 173.347 4.790 -999.990 -999.990 1.733 ..P WKT 2011 04 13 21 34 55 31.3200 -97.3300 251.000 457.0 161.600 3.740 -999.990 -999.990 1.616 ..P WKT 2011 04 13 21 44 55 31.3200 -97.3300 251.000 30.0 168.071 4.590 -999.990 -999.990 1.681 ..P WKT 2011 04 13 21 49 55 31.3200 -97.3300 251.000 122.0 176.529 5.370 -999.990 -999.990 1.765 ..P WKT 2011 04 13 21 54 55 31.3200 -97.3300 251.000 457.0 166.461 5.210 -999.990 -999.990 1.665 ..P WKT 2011 04 13 21 59 55 31.3200 -97.3300 251.000 30.0 168.520 5.920 -999.990 -999.990 1.685 ..P WKT 2011 04 13 22 04 55 31.3200 -97.3300 251.000 122.0 164.176 4.250 -999.990 -999.990 1.642 ..P WKT 2011 04 13 22 09 55 31.3200 -97.3300 251.000 457.0 168.930 3.730 -999.990 -999.990 1.689 ..P WKT 2011 04 13 22 19 55 31.3200 -97.3300 251.000 30.0 165.899 3.700 -999.990 -999.990 1.659 ..P WKT 2011 04 13 22 24 55 31.3200 -97.3300 251.000 122.0 166.031 4.210 -999.990 -999.990 1.660 ..P WKT 2011 04 13 22 29 55 31.3200 -97.3300 251.000 457.0 170.210 5.970 -999.990 -999.990 1.702 ..P WKT 2011 04 13 22 34 55 31.3200 -97.3300 251.000 30.0 167.140 4.190 -999.990 -999.990 1.671 ..P WKT 2011 04 13 22 39 55 31.3200 -97.3300 251.000 122.0 170.647 5.240 -999.990 -999.990 1.706 ..P WKT 2011 04 13 22 44 55 31.3200 -97.3300 251.000 457.0 160.997 4.740 -999.990 -999.990 1.610 ..P WKT 2011 04 13 22 54 55 31.3200 -97.3300 251.000 30.0 165.095 3.950 -999.990 -999.990 1.651 ..P WKT 2011 04 13 22 59 55 31.3200 -97.3300 251.000 122.0 166.361 4.170 -999.990 -999.990 1.664 ..P WKT 2011 04 13 23 04 55 31.3200 -97.3300 251.000 457.0 165.940 3.510 -999.990 -999.990 1.659 ..P WKT 2011 04 13 23 09 55 31.3200 -97.3300 251.000 30.0 166.193 3.800 -999.990 -999.990 1.662 ..P WKT 2011 04 13 23 14 55 31.3200 -97.3300 251.000 122.0 165.772 3.430 -999.990 -999.990 1.658 ..P WKT 2011 04 13 23 19 55 31.3200 -97.3300 251.000 457.0 165.856 3.530 -999.990 -999.990 1.659 ..P WKT 2011 04 13 23 29 55 31.3200 -97.3300 251.000 30.0 159.456 3.490 -999.990 -999.990 1.595 ..P WKT 2011 04 13 23 34 55 31.3200 -97.3300 251.000 122.0 165.466 3.620 -999.990 -999.990 1.655 ..P WKT 2011 04 13 23 39 55 31.3200 -97.3300 251.000 457.0 157.628 3.610 -999.990 -999.990 1.576 ..P WKT 2011 04 13 23 44 55 31.3200 -97.3300 251.000 30.0 162.457 3.660 -999.990 -999.990 1.625 ..P WKT 2011 04 13 23 49 55 31.3200 -97.3300 251.000 122.0 158.671 3.240 -999.990 -999.990 1.587 ..P WKT 2011 04 14 00 09 55 31.3200 -97.3300 251.000 457.0 159.037 3.330 -999.990 -999.990 1.590 ..P WKT 2011 04 14 00 10 25 31.3200 -97.3300 251.000 457.0 158.881 3.330 -999.990 -999.990 1.589 ..P WKT 2011 04 14 00 10 55 31.3200 -97.3300 251.000 457.0 158.218 4.510 -999.990 -999.990 1.582 ..P WKT 2011 04 14 00 11 25 31.3200 -97.3300 251.000 457.0 151.303 3.390 -999.990 -999.990 1.513 ..P WKT 2011 04 14 00 11 55 31.3200 -97.3300 251.000 457.0 155.202 3.050 -999.990 -999.990 1.552 ..P WKT 2011 04 14 00 12 25 31.3200 -97.3300 251.000 457.0 161.297 4.210 -999.990 -999.990 1.613 ..P WKT 2011 04 14 00 12 55 31.3200 -97.3300 251.000 457.0 158.943 4.330 -999.990 -999.990 1.589 ..P WKT 2011 04 14 00 13 25 31.3200 -97.3300 251.000 457.0 156.591 3.560 -999.990 -999.990 1.566 ..P WKT 2011 04 14 00 13 55 31.3200 -97.3300 251.000 457.0 161.335 3.050 -999.990 -999.990 1.613 ..P WKT 2011 04 14 00 14 25 31.3200 -97.3300 251.000 457.0 157.123 3.650 -999.990 -999.990 1.571 ..P WKT 2011 04 14 00 14 55 31.3200 -97.3300 251.000 457.0 155.278 3.450 -999.990 -999.990 1.553 ..P WKT 2011 04 14 00 19 55 31.3200 -97.3300 251.000 30.0 158.782 3.370 -999.990 -999.990 1.588 ..P WKT 2011 04 14 00 24 55 31.3200 -97.3300 251.000 122.0 158.231 3.550 -999.990 -999.990 1.582 ..P WKT 2011 04 14 00 29 55 31.3200 -97.3300 251.000 457.0 153.966 3.830 -999.990 -999.990 1.540 ..P WKT 2011 04 14 00 34 55 31.3200 -97.3300 251.000 30.0 158.821 3.840 -999.990 -999.990 1.588 ..P WKT 2011 04 14 00 39 55 31.3200 -97.3300 251.000 122.0 153.204 3.370 -999.990 -999.990 1.532 ..P WKT 2011 04 14 00 44 55 31.3200 -97.3300 251.000 457.0 152.317 4.390 -999.990 -999.990 1.523 ..P WKT 2011 04 14 00 54 55 31.3200 -97.3300 251.000 30.0 152.775 3.530 -999.990 -999.990 1.528 ..P WKT 2011 04 14 00 59 55 31.3200 -97.3300 251.000 122.0 153.783 3.780 -999.990 -999.990 1.538 ..P WKT 2011 04 14 01 04 55 31.3200 -97.3300 251.000 457.0 159.180 4.490 -999.990 -999.990 1.592 ..P WKT 2011 04 14 01 09 55 31.3200 -97.3300 251.000 30.0 153.434 4.230 -999.990 -999.990 1.534 ..P WKT 2011 04 14 01 14 55 31.3200 -97.3300 251.000 122.0 155.116 4.150 -999.990 -999.990 1.551 ..P WKT 2011 04 14 01 19 55 31.3200 -97.3300 251.000 457.0 159.499 3.790 -999.990 -999.990 1.595 ..P WKT 2011 04 14 01 29 55 31.3200 -97.3300 251.000 30.0 149.410 3.860 -999.990 -999.990 1.494 ..P WKT 2011 04 14 01 34 55 31.3200 -97.3300 251.000 122.0 165.316 4.060 -999.990 -999.990 1.653 ..P WKT 2011 04 14 01 39 55 31.3200 -97.3300 251.000 457.0 149.834 5.150 -999.990 -999.990 1.498 ..P WKT 2011 04 14 01 44 55 31.3200 -97.3300 251.000 30.0 158.651 3.970 -999.990 -999.990 1.587 ..P WKT 2011 04 14 01 49 55 31.3200 -97.3300 251.000 122.0 153.294 3.740 -999.990 -999.990 1.533 ..P WKT 2011 04 14 01 54 55 31.3200 -97.3300 251.000 457.0 150.976 3.850 -999.990 -999.990 1.510 ..P WKT 2011 04 14 02 04 55 31.3200 -97.3300 251.000 30.0 153.206 3.690 -999.990 -999.990 1.532 ..P WKT 2011 04 14 02 09 55 31.3200 -97.3300 251.000 122.0 159.779 3.510 -999.990 -999.990 1.598 ..P WKT 2011 04 14 02 14 55 31.3200 -97.3300 251.000 457.0 156.231 3.740 -999.990 -999.990 1.562 ..P WKT 2011 04 14 02 19 55 31.3200 -97.3300 251.000 30.0 160.104 5.370 -999.990 -999.990 1.601 ..P WKT 2011 04 14 02 24 55 31.3200 -97.3300 251.000 122.0 154.027 4.860 -999.990 -999.990 1.540 ..P WKT 2011 04 14 02 29 55 31.3200 -97.3300 251.000 457.0 150.312 4.420 -999.990 -999.990 1.503 ..P WKT 2011 04 14 02 39 55 31.3200 -97.3300 251.000 30.0 162.393 4.070 -999.990 -999.990 1.624 ..P WKT 2011 04 14 02 44 55 31.3200 -97.3300 251.000 122.0 157.618 5.270 -999.990 -999.990 1.576 ..P WKT 2011 04 14 02 49 55 31.3200 -97.3300 251.000 457.0 152.507 4.200 -999.990 -999.990 1.525 ..P WKT 2011 04 14 02 54 55 31.3200 -97.3300 251.000 30.0 157.848 3.870 -999.990 -999.990 1.578 ..P WKT 2011 04 14 02 59 55 31.3200 -97.3300 251.000 122.0 154.591 3.420 -999.990 -999.990 1.546 ..P WKT 2011 04 14 03 04 55 31.3200 -97.3300 251.000 457.0 139.369 3.730 -999.990 -999.990 1.394 ..P WKT 2011 04 14 03 14 55 31.3200 -97.3300 251.000 30.0 155.851 4.070 -999.990 -999.990 1.559 ..P WKT 2011 04 14 03 19 55 31.3200 -97.3300 251.000 122.0 144.579 4.190 -999.990 -999.990 1.446 ..P WKT 2011 04 14 03 24 55 31.3200 -97.3300 251.000 457.0 143.756 4.450 -999.990 -999.990 1.438 ..P WKT 2011 04 14 03 29 55 31.3200 -97.3300 251.000 30.0 152.705 3.020 -999.990 -999.990 1.527 ..P WKT 2011 04 14 03 34 55 31.3200 -97.3300 251.000 122.0 149.018 4.000 -999.990 -999.990 1.490 ..P WKT 2011 04 14 03 39 55 31.3200 -97.3300 251.000 457.0 142.130 3.480 -999.990 -999.990 1.421 ..P WKT 2011 04 14 03 49 55 31.3200 -97.3300 251.000 30.0 152.226 2.940 -999.990 -999.990 1.522 ..P WKT 2011 04 14 03 54 55 31.3200 -97.3300 251.000 122.0 141.587 4.140 -999.990 -999.990 1.416 ..P WKT 2011 04 14 03 59 55 31.3200 -97.3300 251.000 457.0 143.748 3.530 -999.990 -999.990 1.437 ..P WKT 2011 04 14 04 04 55 31.3200 -97.3300 251.000 30.0 155.507 3.610 -999.990 -999.990 1.555 ..P WKT 2011 04 14 04 09 55 31.3200 -97.3300 251.000 122.0 141.669 2.940 -999.990 -999.990 1.417 ..P WKT 2011 04 14 04 14 55 31.3200 -97.3300 251.000 457.0 145.345 4.250 -999.990 -999.990 1.453 ..P WKT 2011 04 14 04 24 55 31.3200 -97.3300 251.000 30.0 149.279 2.780 -999.990 -999.990 1.493 ..P WKT 2011 04 14 04 29 55 31.3200 -97.3300 251.000 122.0 148.697 4.200 -999.990 -999.990 1.487 ..P WKT 2011 04 14 04 34 55 31.3200 -97.3300 251.000 457.0 140.708 3.070 -999.990 -999.990 1.407 ..P WKT 2011 04 14 04 39 55 31.3200 -97.3300 251.000 30.0 146.523 3.850 -999.990 -999.990 1.465 ..P WKT 2011 04 14 04 44 55 31.3200 -97.3300 251.000 122.0 146.278 3.420 -999.990 -999.990 1.463 ..P WKT 2011 04 14 04 49 55 31.3200 -97.3300 251.000 457.0 147.379 3.420 -999.990 -999.990 1.474 ..P WKT 2011 04 14 05 04 55 31.3200 -97.3300 251.000 30.0 145.777 4.140 -999.990 -999.990 1.458 ..P WKT 2011 04 14 05 09 55 31.3200 -97.3300 251.000 122.0 151.492 3.260 -999.990 -999.990 1.515 ..P WKT 2011 04 14 05 14 55 31.3200 -97.3300 251.000 457.0 145.767 4.370 -999.990 -999.990 1.458 ..P WKT 2011 04 14 05 19 55 31.3200 -97.3300 251.000 30.0 150.809 4.910 -999.990 -999.990 1.508 ..P WKT 2011 04 14 05 24 55 31.3200 -97.3300 251.000 122.0 147.776 4.460 -999.990 -999.990 1.478 ..P WKT 2011 04 14 05 29 55 31.3200 -97.3300 251.000 457.0 145.417 3.500 -999.990 -999.990 1.454 ..P WKT 2011 04 14 05 39 55 31.3200 -97.3300 251.000 30.0 153.094 4.370 -999.990 -999.990 1.531 ..P WKT 2011 04 14 05 44 55 31.3200 -97.3300 251.000 122.0 146.651 6.860 -999.990 -999.990 1.467 ..P WKT 2011 04 14 05 49 55 31.3200 -97.3300 251.000 457.0 144.580 4.530 -999.990 -999.990 1.446 ..P WKT 2011 04 14 05 54 55 31.3200 -97.3300 251.000 30.0 144.191 4.820 -999.990 -999.990 1.442 ..P WKT 2011 04 14 05 59 55 31.3200 -97.3300 251.000 122.0 143.466 4.630 -999.990 -999.990 1.435 ..P WKT 2011 04 14 06 04 55 31.3200 -97.3300 251.000 457.0 138.034 4.170 -999.990 -999.990 1.380 ..P WKT 2011 04 14 06 14 55 31.3200 -97.3300 251.000 30.0 141.219 4.050 -999.990 -999.990 1.412 ..P WKT 2011 04 14 06 19 55 31.3200 -97.3300 251.000 122.0 141.431 5.020 -999.990 -999.990 1.414 ..P WKT 2011 04 14 06 24 55 31.3200 -97.3300 251.000 457.0 141.306 6.050 -999.990 -999.990 1.413 ..P WKT 2011 04 14 06 29 55 31.3200 -97.3300 251.000 30.0 136.980 3.680 -999.990 -999.990 1.370 ..P WKT 2011 04 14 06 34 55 31.3200 -97.3300 251.000 122.0 143.242 3.250 -999.990 -999.990 1.432 ..P WKT 2011 04 14 06 39 55 31.3200 -97.3300 251.000 457.0 137.740 3.740 -999.990 -999.990 1.377 ..P WKT 2011 04 14 06 49 55 31.3200 -97.3300 251.000 30.0 142.579 3.250 -999.990 -999.990 1.426 ..P WKT 2011 04 14 06 54 55 31.3200 -97.3300 251.000 122.0 138.639 3.080 -999.990 -999.990 1.386 ..P WKT 2011 04 14 06 59 55 31.3200 -97.3300 251.000 457.0 140.075 4.770 -999.990 -999.990 1.401 ..P WKT 2011 04 14 07 04 55 31.3200 -97.3300 251.000 30.0 137.983 3.550 -999.990 -999.990 1.380 ..P WKT 2011 04 14 07 09 55 31.3200 -97.3300 251.000 122.0 140.930 4.630 -999.990 -999.990 1.409 ..P WKT 2011 04 14 07 14 55 31.3200 -97.3300 251.000 457.0 144.883 4.150 -999.990 -999.990 1.449 ..P WKT 2011 04 14 07 24 55 31.3200 -97.3300 251.000 30.0 141.252 4.160 -999.990 -999.990 1.413 ..P WKT 2011 04 14 07 29 55 31.3200 -97.3300 251.000 122.0 143.071 4.060 -999.990 -999.990 1.431 ..P WKT 2011 04 14 07 34 55 31.3200 -97.3300 251.000 457.0 143.041 3.350 -999.990 -999.990 1.430 ..P WKT 2011 04 14 07 39 55 31.3200 -97.3300 251.000 30.0 140.663 3.220 -999.990 -999.990 1.407 ..P WKT 2011 04 14 07 44 55 31.3200 -97.3300 251.000 122.0 142.313 2.830 -999.990 -999.990 1.423 ..P WKT 2011 04 14 07 49 55 31.3200 -97.3300 251.000 457.0 145.306 2.610 -999.990 -999.990 1.453 ..P WKT 2011 04 14 07 59 55 31.3200 -97.3300 251.000 30.0 140.022 3.640 -999.990 -999.990 1.400 ..P WKT 2011 04 14 08 04 55 31.3200 -97.3300 251.000 122.0 148.528 3.350 -999.990 -999.990 1.485 ..P WKT 2011 04 14 08 09 55 31.3200 -97.3300 251.000 457.0 148.810 3.850 -999.990 -999.990 1.488 ..P WKT 2011 04 14 08 14 55 31.3200 -97.3300 251.000 30.0 147.582 4.170 -999.990 -999.990 1.476 ..P WKT 2011 04 14 08 19 55 31.3200 -97.3300 251.000 122.0 146.356 4.960 -999.990 -999.990 1.464 ..P WKT 2011 04 14 08 24 55 31.3200 -97.3300 251.000 457.0 154.859 4.150 -999.990 -999.990 1.549 ..P WKT 2011 04 14 08 34 55 31.3200 -97.3300 251.000 30.0 143.274 4.410 -999.990 -999.990 1.433 ..P WKT 2011 04 14 08 39 55 31.3200 -97.3300 251.000 122.0 141.639 4.340 -999.990 -999.990 1.416 ..P WKT 2011 04 14 08 44 55 31.3200 -97.3300 251.000 457.0 149.733 5.110 -999.990 -999.990 1.497 ..P WKT 2011 04 14 08 49 55 31.3200 -97.3300 251.000 30.0 144.745 4.100 -999.990 -999.990 1.447 ..P WKT 2011 04 14 08 54 55 31.3200 -97.3300 251.000 122.0 145.794 4.150 -999.990 -999.990 1.458 ..P WKT 2011 04 14 08 59 55 31.3200 -97.3300 251.000 457.0 152.209 3.830 -999.990 -999.990 1.522 ..P WKT 2011 04 14 09 09 55 31.3200 -97.3300 251.000 30.0 140.415 3.640 -999.990 -999.990 1.404 ..P WKT 2011 04 14 09 14 55 31.3200 -97.3300 251.000 122.0 147.691 3.840 -999.990 -999.990 1.477 ..P WKT 2011 04 14 09 19 55 31.3200 -97.3300 251.000 457.0 150.942 3.560 -999.990 -999.990 1.509 ..P WKT 2011 04 14 09 24 55 31.3200 -97.3300 251.000 30.0 140.784 3.480 -999.990 -999.990 1.408 ..P WKT 2011 04 14 09 29 55 31.3200 -97.3300 251.000 122.0 142.360 3.330 -999.990 -999.990 1.424 ..P WKT 2011 04 14 09 34 55 31.3200 -97.3300 251.000 457.0 143.265 3.300 -999.990 -999.990 1.433 ..P WKT 2011 04 14 09 44 55 31.3200 -97.3300 251.000 30.0 140.790 3.560 -999.990 -999.990 1.408 ..P WKT 2011 04 14 09 49 55 31.3200 -97.3300 251.000 122.0 141.097 2.880 -999.990 -999.990 1.411 ..P WKT 2011 04 14 09 54 55 31.3200 -97.3300 251.000 457.0 152.797 3.050 -999.990 -999.990 1.528 ..P WKT 2011 04 14 09 59 55 31.3200 -97.3300 251.000 30.0 146.402 3.770 -999.990 -999.990 1.464 ..P WKT 2011 04 14 10 04 55 31.3200 -97.3300 251.000 122.0 146.372 3.740 -999.990 -999.990 1.464 ..P WKT 2011 04 14 10 09 55 31.3200 -97.3300 251.000 457.0 146.512 3.260 -999.990 -999.990 1.465 ..P WKT 2011 04 14 10 19 55 31.3200 -97.3300 251.000 30.0 144.683 2.910 -999.990 -999.990 1.447 ..P WKT 2011 04 14 10 24 55 31.3200 -97.3300 251.000 122.0 142.717 2.960 -999.990 -999.990 1.427 ..P WKT 2011 04 14 10 29 55 31.3200 -97.3300 251.000 457.0 143.932 4.130 -999.990 -999.990 1.439 ..P WKT 2011 04 14 10 34 55 31.3200 -97.3300 251.000 30.0 144.310 4.120 -999.990 -999.990 1.443 ..P WKT 2011 04 14 10 39 55 31.3200 -97.3300 251.000 122.0 150.214 4.180 -999.990 -999.990 1.502 ..P WKT 2011 04 14 10 44 55 31.3200 -97.3300 251.000 457.0 151.930 4.700 -999.990 -999.990 1.519 ..P WKT 2011 04 14 10 54 55 31.3200 -97.3300 251.000 30.0 144.172 4.220 -999.990 -999.990 1.442 ..P WKT 2011 04 14 10 59 55 31.3200 -97.3300 251.000 122.0 139.050 4.110 -999.990 -999.990 1.391 ..P WKT 2011 04 14 11 04 55 31.3200 -97.3300 251.000 457.0 140.623 4.890 -999.990 -999.990 1.406 ..P WKT 2011 04 14 11 09 55 31.3200 -97.3300 251.000 30.0 140.188 6.080 -999.990 -999.990 1.402 ..P WKT 2011 04 14 11 14 55 31.3200 -97.3300 251.000 122.0 140.256 5.490 -999.990 -999.990 1.403 ..P WKT 2011 04 14 11 19 55 31.3200 -97.3300 251.000 457.0 144.004 5.070 -999.990 -999.990 1.440 ..P WKT 2011 04 14 11 29 55 31.3200 -97.3300 251.000 30.0 134.404 5.010 -999.990 -999.990 1.344 ..P WKT 2011 04 14 11 34 55 31.3200 -97.3300 251.000 122.0 134.609 4.830 -999.990 -999.990 1.346 ..P WKT 2011 04 14 11 39 55 31.3200 -97.3300 251.000 457.0 138.829 5.900 -999.990 -999.990 1.388 ..P WKT 2011 04 14 11 44 55 31.3200 -97.3300 251.000 30.0 139.034 5.740 -999.990 -999.990 1.390 ..P WKT 2011 04 14 11 49 55 31.3200 -97.3300 251.000 122.0 144.090 3.830 -999.990 -999.990 1.441 ..P WKT 2011 04 14 12 09 55 31.3200 -97.3300 251.000 457.0 152.888 3.110 -999.990 -999.990 1.529 ..P WKT 2011 04 14 12 10 25 31.3200 -97.3300 251.000 457.0 145.865 2.890 -999.990 -999.990 1.459 ..P WKT 2011 04 14 12 10 55 31.3200 -97.3300 251.000 457.0 150.548 2.910 -999.990 -999.990 1.505 ..P WKT 2011 04 14 12 11 25 31.3200 -97.3300 251.000 457.0 152.221 2.630 -999.990 -999.990 1.522 ..P WKT 2011 04 14 12 11 55 31.3200 -97.3300 251.000 457.0 154.896 2.550 -999.990 -999.990 1.549 ..P WKT 2011 04 14 12 12 25 31.3200 -97.3300 251.000 457.0 148.877 3.040 -999.990 -999.990 1.489 ..P WKT 2011 04 14 12 12 55 31.3200 -97.3300 251.000 457.0 149.212 2.730 -999.990 -999.990 1.492 ..P WKT 2011 04 14 12 13 25 31.3200 -97.3300 251.000 457.0 148.210 3.220 -999.990 -999.990 1.482 ..P WKT 2011 04 14 12 13 55 31.3200 -97.3300 251.000 457.0 147.875 2.920 -999.990 -999.990 1.479 ..P WKT 2011 04 14 12 14 25 31.3200 -97.3300 251.000 457.0 151.555 3.160 -999.990 -999.990 1.516 ..P WKT 2011 04 14 12 14 55 31.3200 -97.3300 251.000 457.0 149.549 3.490 -999.990 -999.990 1.495 ..P WKT 2011 04 14 12 19 55 31.3200 -97.3300 251.000 30.0 143.201 4.040 -999.990 -999.990 1.432 ..P WKT 2011 04 14 12 24 55 31.3200 -97.3300 251.000 122.0 153.238 3.720 -999.990 -999.990 1.532 ..P WKT 2011 04 14 12 29 55 31.3200 -97.3300 251.000 457.0 146.221 6.920 -999.990 -999.990 1.462 ..P WKT 2011 04 14 12 34 55 31.3200 -97.3300 251.000 30.0 137.868 4.010 -999.990 -999.990 1.379 ..P WKT 2011 04 14 12 39 55 31.3200 -97.3300 251.000 122.0 145.230 4.230 -999.990 -999.990 1.452 ..P WKT 2011 04 14 12 44 55 31.3200 -97.3300 251.000 457.0 152.589 4.220 -999.990 -999.990 1.526 ..P WKT 2011 04 14 12 54 55 31.3200 -97.3300 251.000 30.0 151.864 4.380 -999.990 -999.990 1.519 ..P WKT 2011 04 14 12 59 55 31.3200 -97.3300 251.000 122.0 146.455 3.990 -999.990 -999.990 1.465 ..P WKT 2011 04 14 13 04 55 31.3200 -97.3300 251.000 457.0 151.073 3.780 -999.990 -999.990 1.511 ..P WKT 2011 04 14 13 09 55 31.3200 -97.3300 251.000 30.0 146.667 3.970 -999.990 -999.990 1.467 ..P WKT 2011 04 14 13 14 55 31.3200 -97.3300 251.000 122.0 153.623 3.420 -999.990 -999.990 1.536 ..P WKT 2011 04 14 13 19 55 31.3200 -97.3300 251.000 457.0 157.905 3.620 -999.990 -999.990 1.579 ..P WKT 2011 04 14 13 29 55 31.3200 -97.3300 251.000 30.0 146.997 3.650 -999.990 -999.990 1.470 ..P WKT 2011 04 14 13 34 55 31.3200 -97.3300 251.000 122.0 140.828 3.690 -999.990 -999.990 1.408 ..P WKT 2011 04 14 13 39 55 31.3200 -97.3300 251.000 457.0 151.361 2.780 -999.990 -999.990 1.514 ..P WKT 2011 04 14 13 44 55 31.3200 -97.3300 251.000 30.0 137.512 2.670 -999.990 -999.990 1.375 ..P WKT 2011 04 14 13 49 55 31.3200 -97.3300 251.000 122.0 148.376 4.620 -999.990 -999.990 1.484 ..P WKT 2011 04 14 13 54 55 31.3200 -97.3300 251.000 457.0 155.565 2.820 -999.990 -999.990 1.556 ..P WKT 2011 04 14 14 04 55 31.3200 -97.3300 251.000 30.0 142.684 2.560 -999.990 -999.990 1.427 ..P WKT 2011 04 14 14 09 55 31.3200 -97.3300 251.000 122.0 151.996 3.790 -999.990 -999.990 1.520 ..P WKT 2011 04 14 14 14 55 31.3200 -97.3300 251.000 457.0 155.797 3.000 -999.990 -999.990 1.558 ..P WKT 2011 04 14 14 19 55 31.3200 -97.3300 251.000 30.0 150.419 2.890 -999.990 -999.990 1.504 ..P WKT 2011 04 14 14 24 55 31.3200 -97.3300 251.000 122.0 142.538 2.710 -999.990 -999.990 1.425 ..P WKT 2011 04 14 14 29 55 31.3200 -97.3300 251.000 457.0 147.341 2.930 -999.990 -999.990 1.473 ..P WKT 2011 04 14 14 39 55 31.3200 -97.3300 251.000 30.0 147.672 2.570 -999.990 -999.990 1.477 ..P WKT 2011 04 14 14 44 55 31.3200 -97.3300 251.000 122.0 144.703 2.780 -999.990 -999.990 1.447 ..P WKT 2011 04 14 14 49 55 31.3200 -97.3300 251.000 457.0 149.575 2.940 -999.990 -999.990 1.496 ..P WKT 2011 04 14 14 54 55 31.3200 -97.3300 251.000 30.0 148.942 2.950 -999.990 -999.990 1.489 ..P WKT 2011 04 14 14 59 55 31.3200 -97.3300 251.000 122.0 144.307 3.130 -999.990 -999.990 1.443 ..P WKT 2011 04 14 15 04 55 31.3200 -97.3300 251.000 457.0 143.174 3.170 -999.990 -999.990 1.432 ..P WKT 2011 04 14 15 14 55 31.3200 -97.3300 251.000 30.0 136.932 3.590 -999.990 -999.990 1.369 ..P WKT 2011 04 14 15 19 55 31.3200 -97.3300 251.000 122.0 141.993 3.820 -999.990 -999.990 1.420 ..P WKT 2011 04 14 15 24 55 31.3200 -97.3300 251.000 457.0 140.884 3.170 -999.990 -999.990 1.409 ..P WKT 2011 04 14 15 29 55 31.3200 -97.3300 251.000 30.0 140.610 2.770 -999.990 -999.990 1.406 ..P WKT 2011 04 14 15 34 55 31.3200 -97.3300 251.000 122.0 142.669 2.970 -999.990 -999.990 1.427 ..P WKT 2011 04 14 15 39 55 31.3200 -97.3300 251.000 457.0 137.560 4.110 -999.990 -999.990 1.376 ..P WKT 2011 04 14 15 49 55 31.3200 -97.3300 251.000 30.0 137.655 2.740 -999.990 -999.990 1.377 ..P WKT 2011 04 14 15 54 55 31.3200 -97.3300 251.000 122.0 144.689 3.530 -999.990 -999.990 1.447 ..P WKT 2011 04 14 15 59 55 31.3200 -97.3300 251.000 457.0 140.724 3.430 -999.990 -999.990 1.407 ..P WKT 2011 04 14 16 04 55 31.3200 -97.3300 251.000 30.0 142.425 3.450 -999.990 -999.990 1.424 ..P WKT 2011 04 14 16 09 55 31.3200 -97.3300 251.000 122.0 145.292 3.750 -999.990 -999.990 1.453 ..P WKT 2011 04 14 16 14 55 31.3200 -97.3300 251.000 457.0 146.660 4.000 -999.990 -999.990 1.467 ..P WKT 2011 04 14 16 24 55 31.3200 -97.3300 251.000 30.0 139.971 5.040 -999.990 -999.990 1.400 ..P WKT 2011 04 14 16 29 55 31.3200 -97.3300 251.000 122.0 144.908 4.180 -999.990 -999.990 1.449 ..P WKT 2011 04 14 16 34 55 31.3200 -97.3300 251.000 457.0 147.512 3.960 -999.990 -999.990 1.475 ..P WKT 2011 04 14 16 39 55 31.3200 -97.3300 251.000 30.0 144.121 3.890 -999.990 -999.990 1.441 ..P WKT 2011 04 14 16 44 55 31.3200 -97.3300 251.000 122.0 151.720 3.860 -999.990 -999.990 1.517 ..P WKT 2011 04 14 16 49 55 31.3200 -97.3300 251.000 457.0 154.656 3.920 -999.990 -999.990 1.547 ..P WKT 2011 04 14 17 04 55 31.3200 -97.3300 251.000 30.0 149.241 3.620 -999.990 -999.990 1.492 ..P WKT 2011 04 14 17 09 55 31.3200 -97.3300 251.000 122.0 160.880 3.630 -999.990 -999.990 1.609 ..P WKT 2011 04 14 17 14 55 31.3200 -97.3300 251.000 457.0 157.870 3.450 -999.990 -999.990 1.579 ..P WKT 2011 04 14 17 19 55 31.3200 -97.3300 251.000 30.0 159.852 3.990 -999.990 -999.990 1.599 ..P WKT 2011 04 14 17 24 55 31.3200 -97.3300 251.000 122.0 157.509 3.900 -999.990 -999.990 1.575 ..P WKT 2011 04 14 17 29 55 31.3200 -97.3300 251.000 457.0 153.500 3.450 -999.990 -999.990 1.535 ..P WKT 2011 04 14 17 39 55 31.3200 -97.3300 251.000 30.0 157.633 3.760 -999.990 -999.990 1.576 ..P WKT 2011 04 14 17 44 55 31.3200 -97.3300 251.000 122.0 153.793 2.990 -999.990 -999.990 1.538 ..P WKT 2011 04 14 17 49 55 31.3200 -97.3300 251.000 457.0 148.622 3.310 -999.990 -999.990 1.486 ..P WKT 2011 04 14 17 54 55 31.3200 -97.3300 251.000 30.0 145.116 3.350 -999.990 -999.990 1.451 ..P WKT 2011 04 14 17 59 55 31.3200 -97.3300 251.000 122.0 151.923 4.450 -999.990 -999.990 1.519 ..P WKT 2011 04 14 18 04 55 31.3200 -97.3300 251.000 457.0 144.258 5.330 -999.990 -999.990 1.443 ..P WKT 2011 04 14 18 14 55 31.3200 -97.3300 251.000 30.0 152.524 3.960 -999.990 -999.990 1.525 ..P WKT 2011 04 14 18 19 55 31.3200 -97.3300 251.000 122.0 158.805 3.280 -999.990 -999.990 1.588 ..P WKT 2011 04 14 18 24 55 31.3200 -97.3300 251.000 457.0 148.292 3.100 -999.990 -999.990 1.483 ..P WKT 2011 04 14 18 29 55 31.3200 -97.3300 251.000 30.0 151.415 3.470 -999.990 -999.990 1.514 ..P WKT 2011 04 14 18 34 55 31.3200 -97.3300 251.000 122.0 147.886 3.880 -999.990 -999.990 1.479 ..P WKT 2011 04 14 18 39 55 31.3200 -97.3300 251.000 457.0 152.171 3.920 -999.990 -999.990 1.522 ..P WKT 2011 04 14 18 49 55 31.3200 -97.3300 251.000 30.0 150.197 4.400 -999.990 -999.990 1.502 ..P WKT 2011 04 14 18 54 55 31.3200 -97.3300 251.000 122.0 160.559 4.320 -999.990 -999.990 1.606 ..P WKT 2011 04 14 18 59 55 31.3200 -97.3300 251.000 457.0 158.788 3.300 -999.990 -999.990 1.588 ..P WKT 2011 04 14 19 04 55 31.3200 -97.3300 251.000 30.0 161.836 4.970 -999.990 -999.990 1.618 ..P WKT 2011 04 14 19 09 55 31.3200 -97.3300 251.000 122.0 162.392 3.940 -999.990 -999.990 1.624 ..P WKT 2011 04 14 19 14 55 31.3200 -97.3300 251.000 457.0 154.972 4.240 -999.990 -999.990 1.550 ..P WKT 2011 04 14 19 24 55 31.3200 -97.3300 251.000 30.0 153.711 3.450 -999.990 -999.990 1.537 ..P WKT 2011 04 14 19 29 55 31.3200 -97.3300 251.000 122.0 154.219 3.070 -999.990 -999.990 1.542 ..P WKT 2011 04 14 19 34 55 31.3200 -97.3300 251.000 457.0 159.544 3.090 -999.990 -999.990 1.595 ..P WKT 2011 04 14 19 39 55 31.3200 -97.3300 251.000 30.0 156.731 3.810 -999.990 -999.990 1.567 ..P WKT 2011 04 14 19 44 55 31.3200 -97.3300 251.000 122.0 160.892 2.870 -999.990 -999.990 1.609 ..P WKT 2011 04 14 19 49 55 31.3200 -97.3300 251.000 457.0 162.230 2.500 -999.990 -999.990 1.622 ..P WKT 2011 04 14 19 59 55 31.3200 -97.3300 251.000 30.0 162.676 3.550 -999.990 -999.990 1.627 ..P WKT 2011 04 14 20 04 55 31.3200 -97.3300 251.000 122.0 160.291 4.300 -999.990 -999.990 1.603 ..P WKT 2011 04 14 20 09 55 31.3200 -97.3300 251.000 457.0 158.237 3.050 -999.990 -999.990 1.582 ..P WKT 2011 04 14 20 14 55 31.3200 -97.3300 251.000 30.0 158.840 2.710 -999.990 -999.990 1.588 ..P WKT 2011 04 14 20 19 55 31.3200 -97.3300 251.000 122.0 161.434 3.120 -999.990 -999.990 1.614 ..P WKT 2011 04 14 20 24 55 31.3200 -97.3300 251.000 457.0 168.011 3.830 -999.990 -999.990 1.680 ..P WKT 2011 04 14 20 34 55 31.3200 -97.3300 251.000 30.0 156.508 3.760 -999.990 -999.990 1.565 ..P WKT 2011 04 14 20 39 55 31.3200 -97.3300 251.000 122.0 155.356 2.800 -999.990 -999.990 1.554 ..P WKT 2011 04 14 20 44 55 31.3200 -97.3300 251.000 457.0 156.528 3.030 -999.990 -999.990 1.565 ..P WKT 2011 04 14 20 49 55 31.3200 -97.3300 251.000 30.0 156.372 4.030 -999.990 -999.990 1.564 ..P WKT 2011 04 14 20 54 55 31.3200 -97.3300 251.000 122.0 157.543 3.520 -999.990 -999.990 1.575 ..P WKT 2011 04 14 20 59 55 31.3200 -97.3300 251.000 457.0 160.041 3.840 -999.990 -999.990 1.600 ..P WKT 2011 04 14 21 09 55 31.3200 -97.3300 251.000 30.0 157.218 3.250 -999.990 -999.990 1.572 ..P WKT 2011 04 14 21 14 55 31.3200 -97.3300 251.000 122.0 163.506 3.020 -999.990 -999.990 1.635 ..P WKT 2011 04 14 21 19 55 31.3200 -97.3300 251.000 457.0 163.823 3.630 -999.990 -999.990 1.638 ..P WKT 2011 04 14 21 24 55 31.3200 -97.3300 251.000 30.0 156.513 3.190 -999.990 -999.990 1.565 ..P WKT 2011 04 14 21 29 55 31.3200 -97.3300 251.000 122.0 160.810 2.690 -999.990 -999.990 1.608 ..P WKT 2011 04 14 21 34 55 31.3200 -97.3300 251.000 457.0 154.165 2.600 -999.990 -999.990 1.542 ..P WKT 2011 04 14 21 44 55 31.3200 -97.3300 251.000 30.0 150.775 4.040 -999.990 -999.990 1.508 ..P WKT 2011 04 14 21 49 55 31.3200 -97.3300 251.000 122.0 147.399 2.940 -999.990 -999.990 1.474 ..P WKT 2011 04 14 21 54 55 31.3200 -97.3300 251.000 457.0 152.807 3.240 -999.990 -999.990 1.528 ..P WKT 2011 04 14 21 59 55 31.3200 -97.3300 251.000 30.0 157.718 4.110 -999.990 -999.990 1.577 ..P WKT 2011 04 14 22 04 55 31.3200 -97.3300 251.000 122.0 154.509 4.470 -999.990 -999.990 1.545 ..P WKT 2011 04 14 22 09 55 31.3200 -97.3300 251.000 457.0 150.968 3.070 -999.990 -999.990 1.510 ..P WKT 2011 04 14 22 19 55 31.3200 -97.3300 251.000 30.0 156.456 3.730 -999.990 -999.990 1.565 ..P WKT 2011 04 14 22 24 55 31.3200 -97.3300 251.000 122.0 156.040 4.000 -999.990 -999.990 1.560 ..P WKT 2011 04 14 22 29 55 31.3200 -97.3300 251.000 457.0 151.649 3.760 -999.990 -999.990 1.516 ..P WKT 2011 04 14 22 34 55 31.3200 -97.3300 251.000 30.0 151.564 4.290 -999.990 -999.990 1.516 ..P WKT 2011 04 14 22 39 55 31.3200 -97.3300 251.000 122.0 154.130 3.980 -999.990 -999.990 1.541 ..P WKT 2011 04 14 22 44 55 31.3200 -97.3300 251.000 457.0 160.504 4.720 -999.990 -999.990 1.605 ..P WKT 2011 04 14 22 54 55 31.3200 -97.3300 251.000 30.0 154.397 5.090 -999.990 -999.990 1.544 ..P WKT 2011 04 14 22 59 55 31.3200 -97.3300 251.000 122.0 155.826 5.860 -999.990 -999.990 1.558 ..P WKT 2011 04 14 23 04 55 31.3200 -97.3300 251.000 457.0 154.772 4.330 -999.990 -999.990 1.548 ..P WKT 2011 04 14 23 09 55 31.3200 -97.3300 251.000 30.0 160.836 4.560 -999.990 -999.990 1.608 ..P WKT 2011 04 14 23 14 55 31.3200 -97.3300 251.000 122.0 166.071 5.060 -999.990 -999.990 1.661 ..P WKT 2011 04 14 23 19 55 31.3200 -97.3300 251.000 457.0 159.058 5.250 -999.990 -999.990 1.591 ..P WKT 2011 04 14 23 29 55 31.3200 -97.3300 251.000 30.0 150.273 6.210 -999.990 -999.990 1.503 ..P WKT 2011 04 14 23 34 55 31.3200 -97.3300 251.000 122.0 156.114 5.250 -999.990 -999.990 1.561 ..P WKT 2011 04 14 23 39 55 31.3200 -97.3300 251.000 457.0 161.623 6.370 -999.990 -999.990 1.616 ..P WKT 2011 04 14 23 44 55 31.3200 -97.3300 251.000 30.0 162.499 4.350 -999.990 -999.990 1.625 ..P WKT 2011 04 14 23 49 55 31.3200 -97.3300 251.000 122.0 166.021 4.100 -999.990 -999.990 1.660 ..P WKT 2011 04 15 00 09 55 31.3200 -97.3300 251.000 457.0 164.812 2.870 -999.990 -999.990 1.648 ..P WKT 2011 04 15 00 10 25 31.3200 -97.3300 251.000 457.0 160.819 3.280 -999.990 -999.990 1.608 ..P WKT 2011 04 15 00 10 55 31.3200 -97.3300 251.000 457.0 161.790 2.850 -999.990 -999.990 1.618 ..P WKT 2011 04 15 00 11 25 31.3200 -97.3300 251.000 457.0 164.747 2.980 -999.990 -999.990 1.647 ..P WKT 2011 04 15 00 11 55 31.3200 -97.3300 251.000 457.0 156.784 3.250 -999.990 -999.990 1.568 ..P WKT 2011 04 15 00 12 25 31.3200 -97.3300 251.000 457.0 163.711 4.320 -999.990 -999.990 1.637 ..P WKT 2011 04 15 00 12 55 31.3200 -97.3300 251.000 457.0 161.042 4.340 -999.990 -999.990 1.610 ..P WKT 2011 04 15 00 13 25 31.3200 -97.3300 251.000 457.0 165.323 3.870 -999.990 -999.990 1.653 ..P WKT 2011 04 15 00 13 55 31.3200 -97.3300 251.000 457.0 170.927 2.940 -999.990 -999.990 1.709 ..P WKT 2011 04 15 00 14 25 31.3200 -97.3300 251.000 457.0 163.625 2.860 -999.990 -999.990 1.636 ..P WKT 2011 04 15 00 14 55 31.3200 -97.3300 251.000 457.0 161.949 2.990 -999.990 -999.990 1.619 ..P WKT 2011 04 15 00 19 55 31.3200 -97.3300 251.000 30.0 158.755 2.860 -999.990 -999.990 1.588 ..P WKT 2011 04 15 00 24 55 31.3200 -97.3300 251.000 122.0 164.829 3.530 -999.990 -999.990 1.648 ..P WKT 2011 04 15 00 29 55 31.3200 -97.3300 251.000 457.0 161.966 4.060 -999.990 -999.990 1.620 ..P WKT 2011 04 15 00 34 55 31.3200 -97.3300 251.000 30.0 156.785 3.480 -999.990 -999.990 1.568 ..P WKT 2011 04 15 00 39 55 31.3200 -97.3300 251.000 122.0 159.549 4.840 -999.990 -999.990 1.595 ..P WKT 2011 04 15 00 44 55 31.3200 -97.3300 251.000 457.0 155.691 3.330 -999.990 -999.990 1.557 ..P WKT 2011 04 15 00 54 55 31.3200 -97.3300 251.000 30.0 160.023 3.300 -999.990 -999.990 1.600 ..P WKT 2011 04 15 00 59 55 31.3200 -97.3300 251.000 122.0 161.258 3.590 -999.990 -999.990 1.613 ..P WKT 2011 04 15 01 04 55 31.3200 -97.3300 251.000 457.0 154.545 4.310 -999.990 -999.990 1.545 ..P WKT 2011 04 15 01 09 55 31.3200 -97.3300 251.000 30.0 159.423 4.960 -999.990 -999.990 1.594 ..P WKT 2011 04 15 01 14 55 31.3200 -97.3300 251.000 122.0 164.303 4.590 -999.990 -999.990 1.643 ..P WKT 2011 04 15 01 19 55 31.3200 -97.3300 251.000 457.0 158.914 3.240 -999.990 -999.990 1.589 ..P WKT 2011 04 15 01 29 55 31.3200 -97.3300 251.000 30.0 148.346 3.340 -999.990 -999.990 1.483 ..P WKT 2011 04 15 01 34 55 31.3200 -97.3300 251.000 122.0 148.468 4.250 -999.990 -999.990 1.485 ..P WKT 2011 04 15 01 39 55 31.3200 -97.3300 251.000 457.0 147.596 5.010 -999.990 -999.990 1.476 ..P WKT 2011 04 15 01 44 55 31.3200 -97.3300 251.000 30.0 143.410 5.200 -999.990 -999.990 1.434 ..P WKT 2011 04 15 01 49 55 31.3200 -97.3300 251.000 122.0 148.505 4.860 -999.990 -999.990 1.485 ..P WKT 2011 04 15 01 54 55 31.3200 -97.3300 251.000 457.0 135.700 3.790 -999.990 -999.990 1.357 ..P WKT 2011 04 15 02 04 55 31.3200 -97.3300 251.000 30.0 132.012 3.770 -999.990 -999.990 1.320 ..P WKT 2011 04 15 02 09 55 31.3200 -97.3300 251.000 122.0 137.984 3.920 -999.990 -999.990 1.380 ..P WKT 2011 04 15 02 14 55 31.3200 -97.3300 251.000 457.0 133.511 4.180 -999.990 -999.990 1.335 ..P WKT 2011 04 15 02 19 55 31.3200 -97.3300 251.000 30.0 128.705 5.040 -999.990 -999.990 1.287 ..P WKT 2011 04 15 02 24 55 31.3200 -97.3300 251.000 122.0 137.497 3.800 -999.990 -999.990 1.375 ..P WKT 2011 04 15 02 29 55 31.3200 -97.3300 251.000 457.0 128.545 3.680 -999.990 -999.990 1.285 ..P WKT 2011 04 15 02 39 55 31.3200 -97.3300 251.000 30.0 129.142 3.490 -999.990 -999.990 1.291 ..P WKT 2011 04 15 02 44 55 31.3200 -97.3300 251.000 122.0 131.728 4.200 -999.990 -999.990 1.317 ..P WKT 2011 04 15 02 49 55 31.3200 -97.3300 251.000 457.0 126.352 3.590 -999.990 -999.990 1.264 ..P WKT 2011 04 15 02 54 55 31.3200 -97.3300 251.000 30.0 124.458 3.570 -999.990 -999.990 1.245 ..P WKT 2011 04 15 02 59 55 31.3200 -97.3300 251.000 122.0 134.511 3.860 -999.990 -999.990 1.345 ..P WKT 2011 04 15 03 04 55 31.3200 -97.3300 251.000 457.0 130.793 3.570 -999.990 -999.990 1.308 ..P WKT 2011 04 15 03 14 55 31.3200 -97.3300 251.000 30.0 132.672 3.420 -999.990 -999.990 1.327 ..P WKT 2011 04 15 03 19 55 31.3200 -97.3300 251.000 122.0 131.631 3.480 -999.990 -999.990 1.316 ..P WKT 2011 04 15 03 24 55 31.3200 -97.3300 251.000 457.0 134.907 4.020 -999.990 -999.990 1.349 ..P WKT 2011 04 15 03 29 55 31.3200 -97.3300 251.000 30.0 129.218 3.870 -999.990 -999.990 1.292 ..P WKT 2011 04 15 03 34 55 31.3200 -97.3300 251.000 122.0 132.163 4.300 -999.990 -999.990 1.322 ..P WKT 2011 04 15 03 39 55 31.3200 -97.3300 251.000 457.0 149.053 3.590 -999.990 -999.990 1.491 ..P WKT 2011 04 15 03 49 55 31.3200 -97.3300 251.000 30.0 137.105 3.590 -999.990 -999.990 1.371 ..P WKT 2011 04 15 03 54 55 31.3200 -97.3300 251.000 122.0 146.457 3.880 -999.990 -999.990 1.465 ..P WKT 2011 04 15 03 59 55 31.3200 -97.3300 251.000 457.0 133.554 3.780 -999.990 -999.990 1.336 ..P WKT 2011 04 15 04 04 55 31.3200 -97.3300 251.000 30.0 144.235 3.750 -999.990 -999.990 1.442 ..P WKT 2011 04 15 04 09 55 31.3200 -97.3300 251.000 122.0 139.303 3.380 -999.990 -999.990 1.393 ..P WKT 2011 04 15 04 14 55 31.3200 -97.3300 251.000 457.0 134.703 5.090 -999.990 -999.990 1.347 ..P WKT 2011 04 15 04 24 55 31.3200 -97.3300 251.000 30.0 131.245 4.490 -999.990 -999.990 1.312 ..P WKT 2011 04 15 04 29 55 31.3200 -97.3300 251.000 122.0 133.051 4.800 -999.990 -999.990 1.331 ..P WKT 2011 04 15 04 34 55 31.3200 -97.3300 251.000 457.0 122.893 4.790 -999.990 -999.990 1.229 ..P WKT 2011 04 15 04 39 55 31.3200 -97.3300 251.000 30.0 124.036 3.930 -999.990 -999.990 1.240 ..P WKT 2011 04 15 04 44 55 31.3200 -97.3300 251.000 122.0 134.485 2.870 -999.990 -999.990 1.345 ..P WKT 2011 04 15 04 49 55 31.3200 -97.3300 251.000 457.0 129.977 2.810 -999.990 -999.990 1.300 ..P WKT 2011 04 15 05 04 55 31.3200 -97.3300 251.000 30.0 130.378 2.780 -999.990 -999.990 1.304 ..P WKT 2011 04 15 05 09 55 31.3200 -97.3300 251.000 122.0 138.653 2.930 -999.990 -999.990 1.387 ..P WKT 2011 04 15 05 14 55 31.3200 -97.3300 251.000 457.0 136.952 3.000 -999.990 -999.990 1.370 ..P WKT 2011 04 15 05 19 55 31.3200 -97.3300 251.000 30.0 134.919 3.180 -999.990 -999.990 1.349 ..P WKT 2011 04 15 05 24 55 31.3200 -97.3300 251.000 122.0 137.874 4.010 -999.990 -999.990 1.379 ..P WKT 2011 04 15 05 29 55 31.3200 -97.3300 251.000 457.0 130.850 4.450 -999.990 -999.990 1.308 ..P WKT 2011 04 15 05 39 55 31.3200 -97.3300 251.000 30.0 132.645 3.430 -999.990 -999.990 1.326 ..P WKT 2011 04 15 05 44 55 31.3200 -97.3300 251.000 122.0 130.485 3.500 -999.990 -999.990 1.305 ..P WKT 2011 04 15 05 49 55 31.3200 -97.3300 251.000 457.0 223.499 5.080 -999.990 -999.990 2.235 ..P WKT 2011 04 15 05 54 55 31.3200 -97.3300 251.000 30.0 140.474 4.330 -999.990 -999.990 1.405 ..P WKT 2011 04 15 05 59 55 31.3200 -97.3300 251.000 122.0 145.970 4.210 -999.990 -999.990 1.460 ..P WKT 2011 04 15 06 04 55 31.3200 -97.3300 251.000 457.0 152.299 3.470 -999.990 -999.990 1.523 ..P WKT 2011 04 15 06 14 55 31.3200 -97.3300 251.000 30.0 166.338 4.450 -999.990 -999.990 1.663 ..P WKT 2011 04 15 06 19 55 31.3200 -97.3300 251.000 122.0 146.082 3.820 -999.990 -999.990 1.461 ..P WKT 2011 04 15 06 24 55 31.3200 -97.3300 251.000 457.0 147.799 4.040 -999.990 -999.990 1.478 ..P WKT 2011 04 15 06 29 55 31.3200 -97.3300 251.000 30.0 182.982 3.710 -999.990 -999.990 1.830 ..P WKT 2011 04 15 06 34 55 31.3200 -97.3300 251.000 122.0 161.889 3.810 -999.990 -999.990 1.619 ..P WKT 2011 04 15 06 39 55 31.3200 -97.3300 251.000 457.0 155.282 3.670 -999.990 -999.990 1.553 ..P WKT 2011 04 15 06 49 55 31.3200 -97.3300 251.000 30.0 162.977 3.370 -999.990 -999.990 1.630 ..P WKT 2011 04 15 06 54 55 31.3200 -97.3300 251.000 122.0 143.970 3.570 -999.990 -999.990 1.440 ..P WKT 2011 04 15 06 59 55 31.3200 -97.3300 251.000 457.0 152.946 4.010 -999.990 -999.990 1.529 ..P WKT 2011 04 15 07 04 55 31.3200 -97.3300 251.000 30.0 159.591 4.540 -999.990 -999.990 1.596 ..P WKT 2011 04 15 07 09 55 31.3200 -97.3300 251.000 122.0 140.079 4.220 -999.990 -999.990 1.401 ..P WKT 2011 04 15 07 14 55 31.3200 -97.3300 251.000 457.0 151.222 3.670 -999.990 -999.990 1.512 ..P WKT 2011 04 15 07 24 55 31.3200 -97.3300 251.000 30.0 155.231 3.380 -999.990 -999.990 1.552 ..P WKT 2011 04 15 07 29 55 31.3200 -97.3300 251.000 122.0 141.927 4.650 -999.990 -999.990 1.419 ..P WKT 2011 04 15 07 34 55 31.3200 -97.3300 251.000 457.0 147.455 4.890 -999.990 -999.990 1.475 ..P WKT 2011 04 15 07 39 55 31.3200 -97.3300 251.000 30.0 147.317 5.500 -999.990 -999.990 1.473 ..P WKT 2011 04 15 07 44 55 31.3200 -97.3300 251.000 122.0 146.511 4.740 -999.990 -999.990 1.465 ..P WKT 2011 04 15 07 49 55 31.3200 -97.3300 251.000 457.0 154.209 3.830 -999.990 -999.990 1.542 ..P WKT 2011 04 15 07 59 55 31.3200 -97.3300 251.000 30.0 148.573 4.110 -999.990 -999.990 1.486 ..P WKT 2011 04 15 08 04 55 31.3200 -97.3300 251.000 122.0 145.576 5.290 -999.990 -999.990 1.456 ..P WKT 2011 04 15 08 09 55 31.3200 -97.3300 251.000 457.0 152.918 5.070 -999.990 -999.990 1.529 ..P WKT 2011 04 15 08 14 55 31.3200 -97.3300 251.000 30.0 144.249 4.600 -999.990 -999.990 1.442 ..P WKT 2011 04 15 08 19 55 31.3200 -97.3300 251.000 122.0 147.590 3.470 -999.990 -999.990 1.476 ..P WKT 2011 04 15 08 24 55 31.3200 -97.3300 251.000 457.0 154.267 4.010 -999.990 -999.990 1.543 ..P WKT 2011 04 15 08 34 55 31.3200 -97.3300 251.000 30.0 142.216 3.500 -999.990 -999.990 1.422 ..P WKT 2011 04 15 08 39 55 31.3200 -97.3300 251.000 122.0 171.206 3.600 -999.990 -999.990 1.712 ..P WKT 2011 04 15 08 44 55 31.3200 -97.3300 251.000 457.0 173.501 3.990 -999.990 -999.990 1.735 ..P WKT 2011 04 15 08 49 55 31.3200 -97.3300 251.000 30.0 162.111 3.540 -999.990 -999.990 1.621 ..P WKT 2011 04 15 08 54 55 31.3200 -97.3300 251.000 122.0 175.421 5.590 -999.990 -999.990 1.754 ..P WKT 2011 04 15 08 59 55 31.3200 -97.3300 251.000 457.0 183.058 3.500 -999.990 -999.990 1.831 ..P WKT 2011 04 15 09 09 55 31.3200 -97.3300 251.000 30.0 170.624 3.650 -999.990 -999.990 1.706 ..P WKT 2011 04 15 09 14 55 31.3200 -97.3300 251.000 122.0 176.259 3.710 -999.990 -999.990 1.763 ..P WKT 2011 04 15 09 19 55 31.3200 -97.3300 251.000 457.0 158.854 4.110 -999.990 -999.990 1.589 ..P WKT 2011 04 15 09 24 55 31.3200 -97.3300 251.000 30.0 169.498 4.420 -999.990 -999.990 1.695 ..P WKT 2011 04 15 09 29 55 31.3200 -97.3300 251.000 122.0 162.443 3.450 -999.990 -999.990 1.624 ..P WKT 2011 04 15 09 34 55 31.3200 -97.3300 251.000 457.0 155.387 3.560 -999.990 -999.990 1.554 ..P WKT 2011 04 15 09 44 55 31.3200 -97.3300 251.000 30.0 160.909 4.630 -999.990 -999.990 1.609 ..P WKT 2011 04 15 09 49 55 31.3200 -97.3300 251.000 122.0 173.324 4.590 -999.990 -999.990 1.733 ..P WKT 2011 04 15 09 54 55 31.3200 -97.3300 251.000 457.0 160.347 5.120 -999.990 -999.990 1.603 ..P WKT 2011 04 15 09 59 55 31.3200 -97.3300 251.000 30.0 163.074 4.000 -999.990 -999.990 1.631 ..P WKT 2011 04 15 10 04 55 31.3200 -97.3300 251.000 122.0 161.790 4.170 -999.990 -999.990 1.618 ..P WKT 2011 04 15 10 09 55 31.3200 -97.3300 251.000 457.0 156.831 4.510 -999.990 -999.990 1.568 ..P WKT 2011 04 15 10 19 55 31.3200 -97.3300 251.000 30.0 166.057 3.860 -999.990 -999.990 1.661 ..P WKT 2011 04 15 10 24 55 31.3200 -97.3300 251.000 122.0 164.869 3.900 -999.990 -999.990 1.649 ..P WKT 2011 04 15 10 29 55 31.3200 -97.3300 251.000 457.0 156.326 3.940 -999.990 -999.990 1.563 ..P WKT 2011 04 15 10 34 55 31.3200 -97.3300 251.000 30.0 161.823 4.160 -999.990 -999.990 1.618 ..P WKT 2011 04 15 10 39 55 31.3200 -97.3300 251.000 122.0 182.704 4.170 -999.990 -999.990 1.827 ..P WKT 2011 04 15 10 44 55 31.3200 -97.3300 251.000 457.0 244.720 8.320 -999.990 -999.990 2.447 ..P WKT 2011 04 15 10 54 55 31.3200 -97.3300 251.000 30.0 182.893 3.810 -999.990 -999.990 1.829 ..P WKT 2011 04 15 10 59 55 31.3200 -97.3300 251.000 122.0 167.897 4.760 -999.990 -999.990 1.679 ..P WKT 2011 04 15 11 04 55 31.3200 -97.3300 251.000 457.0 197.722 5.840 -999.990 -999.990 1.977 ..P WKT 2011 04 15 11 09 55 31.3200 -97.3300 251.000 30.0 176.033 4.880 -999.990 -999.990 1.760 ..P WKT 2011 04 15 11 14 55 31.3200 -97.3300 251.000 122.0 226.274 4.160 -999.990 -999.990 2.263 ..P WKT 2011 04 15 11 19 55 31.3200 -97.3300 251.000 457.0 167.443 3.910 -999.990 -999.990 1.674 ..P WKT 2011 04 15 11 29 55 31.3200 -97.3300 251.000 30.0 202.139 3.870 -999.990 -999.990 2.021 ..P WKT 2011 04 15 11 34 55 31.3200 -97.3300 251.000 122.0 207.169 5.680 -999.990 -999.990 2.072 ..P WKT 2011 04 15 11 39 55 31.3200 -97.3300 251.000 457.0 155.464 4.310 -999.990 -999.990 1.555 ..P WKT 2011 04 15 11 44 55 31.3200 -97.3300 251.000 30.0 210.200 4.640 -999.990 -999.990 2.102 ..P WKT 2011 04 15 11 49 55 31.3200 -97.3300 251.000 122.0 211.883 4.470 -999.990 -999.990 2.119 ..P WKT 2011 04 15 12 09 55 31.3200 -97.3300 251.000 457.0 217.610 4.560 -999.990 -999.990 2.176 ..P WKT 2011 04 15 12 10 25 31.3200 -97.3300 251.000 457.0 215.255 4.830 -999.990 -999.990 2.153 ..P WKT 2011 04 15 12 10 55 31.3200 -97.3300 251.000 457.0 210.559 4.790 -999.990 -999.990 2.106 ..P WKT 2011 04 15 12 11 25 31.3200 -97.3300 251.000 457.0 214.564 4.660 -999.990 -999.990 2.146 ..P WKT 2011 04 15 12 11 55 31.3200 -97.3300 251.000 457.0 205.516 4.750 -999.990 -999.990 2.055 ..P WKT 2011 04 15 12 12 25 31.3200 -97.3300 251.000 457.0 195.799 7.220 -999.990 -999.990 1.958 ..P WKT 2011 04 15 12 12 55 31.3200 -97.3300 251.000 457.0 182.066 4.980 -999.990 -999.990 1.821 ..P WKT 2011 04 15 12 13 25 31.3200 -97.3300 251.000 457.0 193.769 5.970 -999.990 -999.990 1.938 ..P WKT 2011 04 15 12 13 55 31.3200 -97.3300 251.000 457.0 196.101 4.450 -999.990 -999.990 1.961 ..P WKT 2011 04 15 12 14 25 31.3200 -97.3300 251.000 457.0 198.098 4.810 -999.990 -999.990 1.981 ..P WKT 2011 04 15 12 14 55 31.3200 -97.3300 251.000 457.0 196.749 5.170 -999.990 -999.990 1.967 ..P WKT 2011 04 15 12 19 55 31.3200 -97.3300 251.000 30.0 240.806 4.660 -999.990 -999.990 2.408 ..P WKT 2011 04 15 12 24 55 31.3200 -97.3300 251.000 122.0 245.708 5.270 -999.990 -999.990 2.457 ..P WKT 2011 04 15 12 29 55 31.3200 -97.3300 251.000 457.0 207.794 6.700 -999.990 -999.990 2.078 ..P WKT 2011 04 15 12 34 55 31.3200 -97.3300 251.000 30.0 247.814 4.680 -999.990 -999.990 2.478 ..P WKT 2011 04 15 12 39 55 31.3200 -97.3300 251.000 122.0 232.985 4.220 -999.990 -999.990 2.330 ..P WKT 2011 04 15 12 44 55 31.3200 -97.3300 251.000 457.0 186.736 3.910 -999.990 -999.990 1.867 ..P WKT 2011 04 15 12 54 55 31.3200 -97.3300 251.000 30.0 233.287 4.060 -999.990 -999.990 2.333 ..P WKT 2011 04 15 12 59 55 31.3200 -97.3300 251.000 122.0 187.709 4.200 -999.990 -999.990 1.877 ..P WKT 2011 04 15 13 04 55 31.3200 -97.3300 251.000 457.0 156.846 4.010 -999.990 -999.990 1.568 ..P WKT 2011 04 15 13 09 55 31.3200 -97.3300 251.000 30.0 214.508 5.890 -999.990 -999.990 2.145 ..P WKT 2011 04 15 13 14 55 31.3200 -97.3300 251.000 122.0 185.988 4.520 -999.990 -999.990 1.860 ..P WKT 2011 04 15 13 19 55 31.3200 -97.3300 251.000 457.0 153.806 4.410 -999.990 -999.990 1.538 ..P WKT 2011 04 15 13 29 55 31.3200 -97.3300 251.000 30.0 187.250 4.710 -999.990 -999.990 1.873 ..P WKT 2011 04 15 13 34 55 31.3200 -97.3300 251.000 122.0 174.750 4.250 -999.990 -999.990 1.748 ..P WKT 2011 04 15 13 39 55 31.3200 -97.3300 251.000 457.0 146.906 3.900 -999.990 -999.990 1.469 ..P WKT 2011 04 15 13 44 55 31.3200 -97.3300 251.000 30.0 171.615 4.760 -999.990 -999.990 1.716 ..P WKT 2011 04 15 13 49 55 31.3200 -97.3300 251.000 122.0 157.957 3.800 -999.990 -999.990 1.580 ..P WKT 2011 04 15 13 54 55 31.3200 -97.3300 251.000 457.0 136.966 3.780 -999.990 -999.990 1.370 ..P WKT 2011 04 15 14 04 55 31.3200 -97.3300 251.000 30.0 151.301 3.540 -999.990 -999.990 1.513 ..P WKT 2011 04 15 14 09 55 31.3200 -97.3300 251.000 122.0 144.775 4.210 -999.990 -999.990 1.448 ..P WKT 2011 04 15 14 14 55 31.3200 -97.3300 251.000 457.0 132.919 4.400 -999.990 -999.990 1.329 ..P WKT 2011 04 15 14 19 55 31.3200 -97.3300 251.000 30.0 144.558 5.460 -999.990 -999.990 1.446 ..P WKT 2011 04 15 14 24 55 31.3200 -97.3300 251.000 122.0 132.539 4.950 -999.990 -999.990 1.325 ..P WKT 2011 04 15 14 29 55 31.3200 -97.3300 251.000 457.0 131.683 4.230 -999.990 -999.990 1.317 ..P WKT 2011 04 15 14 39 55 31.3200 -97.3300 251.000 30.0 135.728 4.620 -999.990 -999.990 1.357 ..P WKT 2011 04 15 14 44 55 31.3200 -97.3300 251.000 122.0 136.964 4.950 -999.990 -999.990 1.370 ..P WKT 2011 04 15 14 49 55 31.3200 -97.3300 251.000 457.0 133.207 4.680 -999.990 -999.990 1.332 ..P WKT 2011 04 15 14 54 55 31.3200 -97.3300 251.000 30.0 133.280 4.440 -999.990 -999.990 1.333 ..P WKT 2011 04 15 14 59 55 31.3200 -97.3300 251.000 122.0 141.504 4.810 -999.990 -999.990 1.415 ..P WKT 2011 04 15 15 04 55 31.3200 -97.3300 251.000 457.0 137.415 4.400 -999.990 -999.990 1.374 ..P WKT 2011 04 15 15 14 55 31.3200 -97.3300 251.000 30.0 137.462 4.670 -999.990 -999.990 1.375 ..P WKT 2011 04 15 15 19 55 31.3200 -97.3300 251.000 122.0 137.937 4.390 -999.990 -999.990 1.379 ..P WKT 2011 04 15 15 24 55 31.3200 -97.3300 251.000 457.0 137.580 4.560 -999.990 -999.990 1.376 ..P WKT 2011 04 15 15 29 55 31.3200 -97.3300 251.000 30.0 137.889 4.400 -999.990 -999.990 1.379 ..P WKT 2011 04 15 15 34 55 31.3200 -97.3300 251.000 122.0 136.868 4.490 -999.990 -999.990 1.369 ..P WKT 2011 04 15 15 39 55 31.3200 -97.3300 251.000 457.0 139.003 4.420 -999.990 -999.990 1.390 ..P WKT 2011 04 15 15 49 55 31.3200 -97.3300 251.000 30.0 141.375 5.110 -999.990 -999.990 1.414 ..P WKT 2011 04 15 15 54 55 31.3200 -97.3300 251.000 122.0 136.131 5.170 -999.990 -999.990 1.361 ..P WKT 2011 04 15 15 59 55 31.3200 -97.3300 251.000 457.0 132.217 4.920 -999.990 -999.990 1.322 ..P WKT 2011 04 15 16 04 55 31.3200 -97.3300 251.000 30.0 141.585 5.760 -999.990 -999.990 1.416 ..P WKT 2011 04 15 16 09 55 31.3200 -97.3300 251.000 122.0 139.331 5.120 -999.990 -999.990 1.393 ..P WKT 2011 04 15 16 14 55 31.3200 -97.3300 251.000 457.0 137.410 4.540 -999.990 -999.990 1.374 ..P WKT 2011 04 15 16 24 55 31.3200 -97.3300 251.000 30.0 132.196 4.120 -999.990 -999.990 1.322 ..P WKT 2011 04 15 16 29 55 31.3200 -97.3300 251.000 122.0 143.831 5.820 -999.990 -999.990 1.438 ..P WKT 2011 04 15 16 34 55 31.3200 -97.3300 251.000 457.0 132.908 5.570 -999.990 -999.990 1.329 ..P WKT 2011 04 15 16 39 55 31.3200 -97.3300 251.000 30.0 134.922 5.060 -999.990 -999.990 1.349 ..P WKT 2011 04 15 16 44 55 31.3200 -97.3300 251.000 122.0 142.903 4.240 -999.990 -999.990 1.429 ..P WKT 2011 04 15 16 49 55 31.3200 -97.3300 251.000 457.0 140.606 3.700 -999.990 -999.990 1.406 ..P WKT 2011 04 15 17 04 55 31.3200 -97.3300 251.000 30.0 141.077 4.960 -999.990 -999.990 1.411 ..P WKT 2011 04 15 17 09 55 31.3200 -97.3300 251.000 122.0 149.582 4.890 -999.990 -999.990 1.496 ..P WKT 2011 04 15 17 14 55 31.3200 -97.3300 251.000 457.0 144.174 5.970 -999.990 -999.990 1.442 ..P WKT 2011 04 15 17 19 55 31.3200 -97.3300 251.000 30.0 144.066 3.970 -999.990 -999.990 1.441 ..P WKT 2011 04 15 17 24 55 31.3200 -97.3300 251.000 122.0 147.931 4.290 -999.990 -999.990 1.479 ..P WKT 2011 04 15 17 29 55 31.3200 -97.3300 251.000 457.0 141.202 4.180 -999.990 -999.990 1.412 ..P WKT 2011 04 15 17 39 55 31.3200 -97.3300 251.000 30.0 146.247 4.340 -999.990 -999.990 1.462 ..P WKT 2011 04 15 17 44 55 31.3200 -97.3300 251.000 122.0 142.629 4.090 -999.990 -999.990 1.426 ..P WKT 2011 04 15 17 49 55 31.3200 -97.3300 251.000 457.0 152.575 4.410 -999.990 -999.990 1.526 ..P WKT 2011 04 15 17 54 55 31.3200 -97.3300 251.000 30.0 145.816 4.470 -999.990 -999.990 1.458 ..P WKT 2011 04 15 17 59 55 31.3200 -97.3300 251.000 122.0 152.121 4.570 -999.990 -999.990 1.521 ..P WKT 2011 04 15 18 04 55 31.3200 -97.3300 251.000 457.0 157.432 5.570 -999.990 -999.990 1.574 ..P WKT 2011 04 15 18 14 55 31.3200 -97.3300 251.000 30.0 154.190 4.790 -999.990 -999.990 1.542 ..P WKT 2011 04 15 18 19 55 31.3200 -97.3300 251.000 122.0 149.772 5.380 -999.990 -999.990 1.498 ..P WKT 2011 04 15 18 24 55 31.3200 -97.3300 251.000 457.0 153.948 5.570 -999.990 -999.990 1.539 ..P WKT 2011 04 15 18 29 55 31.3200 -97.3300 251.000 30.0 159.112 7.730 -999.990 -999.990 1.591 ..P WKT 2011 04 15 18 34 55 31.3200 -97.3300 251.000 122.0 163.450 7.050 -999.990 -999.990 1.634 ..P WKT 2011 04 15 18 39 55 31.3200 -97.3300 251.000 457.0 161.016 7.340 -999.990 -999.990 1.610 ..P WKT 2011 04 15 18 49 55 31.3200 -97.3300 251.000 30.0 160.676 7.240 -999.990 -999.990 1.607 ..P WKT 2011 04 15 18 54 55 31.3200 -97.3300 251.000 122.0 161.120 6.250 -999.990 -999.990 1.611 ..P WKT 2011 04 15 18 59 55 31.3200 -97.3300 251.000 457.0 153.808 6.880 -999.990 -999.990 1.538 ..P WKT 2011 04 15 19 04 55 31.3200 -97.3300 251.000 30.0 163.162 6.360 -999.990 -999.990 1.632 ..P WKT 2011 04 15 19 09 55 31.3200 -97.3300 251.000 122.0 164.924 5.620 -999.990 -999.990 1.649 ..P WKT 2011 04 15 19 14 55 31.3200 -97.3300 251.000 457.0 158.275 5.170 -999.990 -999.990 1.583 ..P WKT 2011 04 15 19 24 55 31.3200 -97.3300 251.000 30.0 155.299 4.560 -999.990 -999.990 1.553 ..P WKT 2011 04 15 19 29 55 31.3200 -97.3300 251.000 122.0 157.816 5.620 -999.990 -999.990 1.578 ..P WKT 2011 04 15 19 34 55 31.3200 -97.3300 251.000 457.0 158.354 6.730 -999.990 -999.990 1.584 ..P WKT 2011 04 15 19 39 55 31.3200 -97.3300 251.000 30.0 164.659 5.200 -999.990 -999.990 1.647 ..P WKT 2011 04 15 19 44 55 31.3200 -97.3300 251.000 122.0 157.122 4.190 -999.990 -999.990 1.571 ..P WKT 2011 04 15 19 49 55 31.3200 -97.3300 251.000 457.0 160.790 3.960 -999.990 -999.990 1.608 ..P WKT 2011 04 15 19 59 55 31.3200 -97.3300 251.000 30.0 162.734 3.860 -999.990 -999.990 1.627 ..P WKT 2011 04 15 20 04 55 31.3200 -97.3300 251.000 122.0 160.353 4.420 -999.990 -999.990 1.604 ..P WKT 2011 04 15 20 09 55 31.3200 -97.3300 251.000 457.0 162.913 4.430 -999.990 -999.990 1.629 ..P WKT 2011 04 15 20 14 55 31.3200 -97.3300 251.000 30.0 165.471 4.120 -999.990 -999.990 1.655 ..P WKT 2011 04 15 20 19 55 31.3200 -97.3300 251.000 122.0 176.256 4.510 -999.990 -999.990 1.763 ..P WKT 2011 04 15 20 24 55 31.3200 -97.3300 251.000 457.0 158.409 4.250 -999.990 -999.990 1.584 ..P WKT 2011 04 15 20 34 55 31.3200 -97.3300 251.000 30.0 174.238 5.020 -999.990 -999.990 1.742 ..P WKT 2011 04 15 20 39 55 31.3200 -97.3300 251.000 122.0 163.167 3.920 -999.990 -999.990 1.632 ..P WKT 2011 04 15 20 44 55 31.3200 -97.3300 251.000 457.0 160.320 4.010 -999.990 -999.990 1.603 ..P WKT 2011 04 15 20 49 55 31.3200 -97.3300 251.000 30.0 162.076 3.860 -999.990 -999.990 1.621 ..P WKT 2011 04 15 20 54 55 31.3200 -97.3300 251.000 122.0 155.615 4.010 -999.990 -999.990 1.556 ..P WKT 2011 04 15 20 59 55 31.3200 -97.3300 251.000 457.0 157.702 4.030 -999.990 -999.990 1.577 ..P WKT 2011 04 15 21 09 55 31.3200 -97.3300 251.000 30.0 162.129 4.740 -999.990 -999.990 1.621 ..P WKT 2011 04 15 21 14 55 31.3200 -97.3300 251.000 122.0 165.457 4.080 -999.990 -999.990 1.655 ..P WKT 2011 04 15 21 19 55 31.3200 -97.3300 251.000 457.0 158.601 3.980 -999.990 -999.990 1.586 ..P WKT 2011 04 15 21 24 55 31.3200 -97.3300 251.000 30.0 163.571 4.910 -999.990 -999.990 1.636 ..P WKT 2011 04 15 21 29 55 31.3200 -97.3300 251.000 122.0 165.911 4.120 -999.990 -999.990 1.659 ..P WKT 2011 04 15 21 34 55 31.3200 -97.3300 251.000 457.0 162.342 3.910 -999.990 -999.990 1.623 ..P WKT 2011 04 15 21 44 55 31.3200 -97.3300 251.000 30.0 161.606 3.950 -999.990 -999.990 1.616 ..P WKT 2011 04 15 21 49 55 31.3200 -97.3300 251.000 122.0 162.141 3.950 -999.990 -999.990 1.621 ..P WKT 2011 04 15 21 54 55 31.3200 -97.3300 251.000 457.0 158.903 5.450 -999.990 -999.990 1.589 ..P WKT 2011 04 15 21 59 55 31.3200 -97.3300 251.000 30.0 159.929 4.120 -999.990 -999.990 1.599 ..P WKT 2011 04 15 22 04 55 31.3200 -97.3300 251.000 122.0 157.349 4.350 -999.990 -999.990 1.573 ..P WKT 2011 04 15 22 09 55 31.3200 -97.3300 251.000 457.0 162.146 4.590 -999.990 -999.990 1.621 ..P WKT 2011 04 15 22 19 55 31.3200 -97.3300 251.000 30.0 161.599 4.490 -999.990 -999.990 1.616 ..P WKT 2011 04 15 22 24 55 31.3200 -97.3300 251.000 122.0 163.631 4.410 -999.990 -999.990 1.636 ..P WKT 2011 04 15 22 29 55 31.3200 -97.3300 251.000 457.0 168.120 4.230 -999.990 -999.990 1.681 ..P WKT 2011 04 15 22 34 55 31.3200 -97.3300 251.000 30.0 210.611 4.420 -999.990 -999.990 2.106 ..P WKT 2011 04 15 22 39 55 31.3200 -97.3300 251.000 122.0 239.985 4.650 -999.990 -999.990 2.400 ..P WKT 2011 04 15 22 44 55 31.3200 -97.3300 251.000 457.0 227.920 4.840 -999.990 -999.990 2.279 ..P WKT 2011 04 15 22 54 55 31.3200 -97.3300 251.000 30.0 534.024 17.950 -999.990 -999.990 5.340 ..P WKT 2011 04 15 22 59 55 31.3200 -97.3300 251.000 122.0 616.726 7.590 -999.990 -999.990 6.167 ..P WKT 2011 04 15 23 04 55 31.3200 -97.3300 251.000 457.0 616.925 7.060 -999.990 -999.990 6.169 ..P WKT 2011 04 15 23 09 55 31.3200 -97.3300 251.000 30.0 601.908 7.150 -999.990 -999.990 6.019 ..P WKT 2011 04 15 23 14 55 31.3200 -97.3300 251.000 122.0 590.331 6.770 -999.990 -999.990 5.903 ..P WKT 2011 04 15 23 19 55 31.3200 -97.3300 251.000 457.0 556.515 7.490 -999.990 -999.990 5.565 ..P WKT 2011 04 15 23 29 55 31.3200 -97.3300 251.000 30.0 573.143 6.520 -999.990 -999.990 5.731 ..P WKT 2011 04 15 23 34 55 31.3200 -97.3300 251.000 122.0 534.629 6.260 -999.990 -999.990 5.346 ..P WKT 2011 04 15 23 39 55 31.3200 -97.3300 251.000 457.0 509.204 6.140 -999.990 -999.990 5.092 ..P WKT 2011 04 15 23 44 55 31.3200 -97.3300 251.000 30.0 483.134 5.770 -999.990 -999.990 4.831 ..P WKT 2011 04 15 23 49 55 31.3200 -97.3300 251.000 122.0 439.100 5.370 -999.990 -999.990 4.391 ..P WKT 2011 04 16 00 09 55 31.3200 -97.3300 251.000 457.0 414.296 5.900 -999.990 -999.990 4.143 ..P WKT 2011 04 16 00 10 25 31.3200 -97.3300 251.000 457.0 417.888 5.250 -999.990 -999.990 4.179 ..P WKT 2011 04 16 00 10 55 31.3200 -97.3300 251.000 457.0 422.460 5.230 -999.990 -999.990 4.225 ..P WKT 2011 04 16 00 11 25 31.3200 -97.3300 251.000 457.0 419.518 5.320 -999.990 -999.990 4.195 ..P WKT 2011 04 16 00 11 55 31.3200 -97.3300 251.000 457.0 413.310 5.190 -999.990 -999.990 4.133 ..P WKT 2011 04 16 00 12 25 31.3200 -97.3300 251.000 457.0 414.942 5.460 -999.990 -999.990 4.149 ..P WKT 2011 04 16 00 12 55 31.3200 -97.3300 251.000 457.0 406.119 5.620 -999.990 -999.990 4.061 ..P WKT 2011 04 16 00 13 25 31.3200 -97.3300 251.000 457.0 427.352 7.970 -999.990 -999.990 4.274 ..P WKT 2011 04 16 00 13 55 31.3200 -97.3300 251.000 457.0 437.479 5.450 -999.990 -999.990 4.375 ..P WKT 2011 04 16 00 14 25 31.3200 -97.3300 251.000 457.0 450.872 8.090 -999.990 -999.990 4.509 ..P WKT 2011 04 16 00 14 55 31.3200 -97.3300 251.000 457.0 458.058 7.210 -999.990 -999.990 4.581 ..P WKT 2011 04 16 00 19 55 31.3200 -97.3300 251.000 30.0 408.383 5.360 -999.990 -999.990 4.084 ..P WKT 2011 04 16 00 24 55 31.3200 -97.3300 251.000 122.0 375.694 5.280 -999.990 -999.990 3.757 ..P WKT 2011 04 16 00 29 55 31.3200 -97.3300 251.000 457.0 346.270 5.410 -999.990 -999.990 3.463 ..P WKT 2011 04 16 00 34 55 31.3200 -97.3300 251.000 30.0 356.054 5.330 -999.990 -999.990 3.561 ..P WKT 2011 04 16 00 39 55 31.3200 -97.3300 251.000 122.0 302.446 5.850 -999.990 -999.990 3.024 ..P WKT 2011 04 16 00 44 55 31.3200 -97.3300 251.000 457.0 330.855 4.540 -999.990 -999.990 3.309 ..P WKT 2011 04 16 00 54 55 31.3200 -97.3300 251.000 30.0 299.667 5.020 -999.990 -999.990 2.997 ..P WKT 2011 04 16 00 59 55 31.3200 -97.3300 251.000 122.0 285.163 4.900 -999.990 -999.990 2.852 ..P WKT 2011 04 16 01 04 55 31.3200 -97.3300 251.000 457.0 264.122 5.140 -999.990 -999.990 2.641 ..P WKT 2011 04 16 01 09 55 31.3200 -97.3300 251.000 30.0 293.085 5.900 -999.990 -999.990 2.931 ..P WKT 2011 04 16 01 14 55 31.3200 -97.3300 251.000 122.0 267.139 5.610 -999.990 -999.990 2.671 ..P WKT 2011 04 16 01 19 55 31.3200 -97.3300 251.000 457.0 239.558 4.540 -999.990 -999.990 2.396 ..P WKT 2011 04 16 01 29 55 31.3200 -97.3300 251.000 30.0 275.566 4.900 -999.990 -999.990 2.756 ..P WKT 2011 04 16 01 34 55 31.3200 -97.3300 251.000 122.0 246.978 5.510 -999.990 -999.990 2.470 ..P WKT 2011 04 16 01 39 55 31.3200 -97.3300 251.000 457.0 222.310 5.740 -999.990 -999.990 2.223 ..P WKT 2011 04 16 01 44 55 31.3200 -97.3300 251.000 30.0 257.631 6.200 -999.990 -999.990 2.576 ..P WKT 2011 04 16 01 49 55 31.3200 -97.3300 251.000 122.0 234.923 5.290 -999.990 -999.990 2.349 ..P WKT 2011 04 16 01 54 55 31.3200 -97.3300 251.000 457.0 231.994 4.070 -999.990 -999.990 2.320 ..P WKT 2011 04 16 02 04 55 31.3200 -97.3300 251.000 30.0 235.291 4.280 -999.990 -999.990 2.353 ..P WKT 2011 04 16 02 09 55 31.3200 -97.3300 251.000 122.0 233.015 4.000 -999.990 -999.990 2.330 ..P WKT 2011 04 16 02 14 55 31.3200 -97.3300 251.000 457.0 262.949 4.630 -999.990 -999.990 2.629 ..P WKT 2011 04 16 02 19 55 31.3200 -97.3300 251.000 30.0 229.446 4.700 -999.990 -999.990 2.294 ..P WKT 2011 04 16 02 24 55 31.3200 -97.3300 251.000 122.0 228.641 4.130 -999.990 -999.990 2.286 ..P WKT 2011 04 16 02 29 55 31.3200 -97.3300 251.000 457.0 293.734 5.040 -999.990 -999.990 2.937 ..P WKT 2011 04 16 02 39 55 31.3200 -97.3300 251.000 30.0 223.495 3.760 -999.990 -999.990 2.235 ..P WKT 2011 04 16 02 44 55 31.3200 -97.3300 251.000 122.0 245.959 4.460 -999.990 -999.990 2.460 ..P WKT 2011 04 16 02 49 55 31.3200 -97.3300 251.000 457.0 250.108 4.490 -999.990 -999.990 2.501 ..P WKT 2011 04 16 02 54 55 31.3200 -97.3300 251.000 30.0 230.380 4.540 -999.990 -999.990 2.304 ..P WKT 2011 04 16 02 59 55 31.3200 -97.3300 251.000 122.0 242.216 4.020 -999.990 -999.990 2.422 ..P WKT 2011 04 16 03 04 55 31.3200 -97.3300 251.000 457.0 286.437 5.700 -999.990 -999.990 2.864 ..P WKT 2011 04 16 03 14 55 31.3200 -97.3300 251.000 30.0 239.290 4.970 -999.990 -999.990 2.393 ..P WKT 2011 04 16 03 19 55 31.3200 -97.3300 251.000 122.0 246.547 4.300 -999.990 -999.990 2.465 ..P WKT 2011 04 16 03 24 55 31.3200 -97.3300 251.000 457.0 212.419 4.360 -999.990 -999.990 2.124 ..P WKT 2011 04 16 03 29 55 31.3200 -97.3300 251.000 30.0 235.381 4.530 -999.990 -999.990 2.354 ..P WKT 2011 04 16 03 34 55 31.3200 -97.3300 251.000 122.0 249.838 4.400 -999.990 -999.990 2.498 ..P WKT 2011 04 16 03 39 55 31.3200 -97.3300 251.000 457.0 212.271 4.340 -999.990 -999.990 2.123 ..P WKT 2011 04 16 03 49 55 31.3200 -97.3300 251.000 30.0 246.795 4.420 -999.990 -999.990 2.468 ..P WKT 2011 04 16 03 54 55 31.3200 -97.3300 251.000 122.0 233.486 4.570 -999.990 -999.990 2.335 ..P WKT 2011 04 16 03 59 55 31.3200 -97.3300 251.000 457.0 229.339 4.670 -999.990 -999.990 2.293 ..P WKT 2011 04 16 04 04 55 31.3200 -97.3300 251.000 30.0 241.881 3.900 -999.990 -999.990 2.419 ..P WKT 2011 04 16 04 09 55 31.3200 -97.3300 251.000 122.0 232.170 3.740 -999.990 -999.990 2.322 ..P WKT 2011 04 16 04 14 55 31.3200 -97.3300 251.000 457.0 182.202 3.550 -999.990 -999.990 1.822 ..P WKT 2011 04 16 04 24 55 31.3200 -97.3300 251.000 30.0 243.667 4.720 -999.990 -999.990 2.437 ..P WKT 2011 04 16 04 29 55 31.3200 -97.3300 251.000 122.0 226.800 3.840 -999.990 -999.990 2.268 ..P WKT 2011 04 16 04 34 55 31.3200 -97.3300 251.000 457.0 163.778 5.130 -999.990 -999.990 1.638 ..P WKT 2011 04 16 04 39 55 31.3200 -97.3300 251.000 30.0 237.255 4.230 -999.990 -999.990 2.373 ..P WKT 2011 04 16 04 44 55 31.3200 -97.3300 251.000 122.0 225.952 4.470 -999.990 -999.990 2.260 ..P WKT 2011 04 16 04 49 55 31.3200 -97.3300 251.000 457.0 166.523 4.430 -999.990 -999.990 1.665 ..P WKT 2011 04 16 05 04 55 31.3200 -97.3300 251.000 30.0 219.532 4.460 -999.990 -999.990 2.195 ..P WKT 2011 04 16 05 09 55 31.3200 -97.3300 251.000 122.0 217.479 4.950 -999.990 -999.990 2.175 ..P WKT 2011 04 16 05 14 55 31.3200 -97.3300 251.000 457.0 181.699 4.220 -999.990 -999.990 1.817 ..P WKT 2011 04 16 05 19 55 31.3200 -97.3300 251.000 30.0 213.698 3.830 -999.990 -999.990 2.137 ..P WKT 2011 04 16 05 24 55 31.3200 -97.3300 251.000 122.0 219.994 4.140 -999.990 -999.990 2.200 ..P WKT 2011 04 16 05 29 55 31.3200 -97.3300 251.000 457.0 160.468 3.560 -999.990 -999.990 1.605 ..P WKT 2011 04 16 05 39 55 31.3200 -97.3300 251.000 30.0 204.786 4.120 -999.990 -999.990 2.048 ..P WKT 2011 04 16 05 44 55 31.3200 -97.3300 251.000 122.0 206.787 4.310 -999.990 -999.990 2.068 ..P WKT 2011 04 16 05 49 55 31.3200 -97.3300 251.000 457.0 148.525 3.540 -999.990 -999.990 1.485 ..P WKT 2011 04 16 05 54 55 31.3200 -97.3300 251.000 30.0 210.953 4.520 -999.990 -999.990 2.110 ..P WKT 2011 04 16 05 59 55 31.3200 -97.3300 251.000 122.0 203.947 3.960 -999.990 -999.990 2.039 ..P WKT 2011 04 16 06 04 55 31.3200 -97.3300 251.000 457.0 158.453 3.870 -999.990 -999.990 1.585 ..P WKT 2011 04 16 06 14 55 31.3200 -97.3300 251.000 30.0 210.396 4.140 -999.990 -999.990 2.104 ..P WKT 2011 04 16 06 19 55 31.3200 -97.3300 251.000 122.0 193.842 4.660 -999.990 -999.990 1.938 ..P WKT 2011 04 16 06 24 55 31.3200 -97.3300 251.000 457.0 183.838 4.220 -999.990 -999.990 1.838 ..P WKT 2011 04 16 06 29 55 31.3200 -97.3300 251.000 30.0 200.698 4.480 -999.990 -999.990 2.007 ..P WKT 2011 04 16 06 34 55 31.3200 -97.3300 251.000 122.0 190.531 3.930 -999.990 -999.990 1.905 ..P WKT 2011 04 16 06 39 55 31.3200 -97.3300 251.000 457.0 175.285 3.830 -999.990 -999.990 1.753 ..P WKT 2011 04 16 06 49 55 31.3200 -97.3300 251.000 30.0 198.525 4.430 -999.990 -999.990 1.985 ..P WKT 2011 04 16 06 54 55 31.3200 -97.3300 251.000 122.0 176.395 3.630 -999.990 -999.990 1.764 ..P WKT 2011 04 16 06 59 55 31.3200 -97.3300 251.000 457.0 167.208 4.150 -999.990 -999.990 1.672 ..P WKT 2011 04 16 07 04 55 31.3200 -97.3300 251.000 30.0 190.135 4.810 -999.990 -999.990 1.901 ..P WKT 2011 04 16 07 09 55 31.3200 -97.3300 251.000 122.0 184.716 4.030 -999.990 -999.990 1.847 ..P WKT 2011 04 16 07 14 55 31.3200 -97.3300 251.000 457.0 167.499 4.530 -999.990 -999.990 1.675 ..P WKT 2011 04 16 07 24 55 31.3200 -97.3300 251.000 30.0 190.838 3.550 -999.990 -999.990 1.908 ..P WKT 2011 04 16 07 29 55 31.3200 -97.3300 251.000 122.0 179.612 5.380 -999.990 -999.990 1.796 ..P WKT 2011 04 16 07 34 55 31.3200 -97.3300 251.000 457.0 158.552 5.230 -999.990 -999.990 1.586 ..P WKT 2011 04 16 07 39 55 31.3200 -97.3300 251.000 30.0 195.510 5.550 -999.990 -999.990 1.955 ..P WKT 2011 04 16 07 44 55 31.3200 -97.3300 251.000 122.0 180.349 5.030 -999.990 -999.990 1.803 ..P WKT 2011 04 16 07 49 55 31.3200 -97.3300 251.000 457.0 156.336 3.810 -999.990 -999.990 1.563 ..P WKT 2011 04 16 07 59 55 31.3200 -97.3300 251.000 30.0 197.244 3.880 -999.990 -999.990 1.972 ..P WKT 2011 04 16 08 04 55 31.3200 -97.3300 251.000 122.0 173.979 5.730 -999.990 -999.990 1.740 ..P WKT 2011 04 16 08 09 55 31.3200 -97.3300 251.000 457.0 155.958 5.530 -999.990 -999.990 1.560 ..P WKT 2011 04 16 08 14 55 31.3200 -97.3300 251.000 30.0 194.329 5.700 -999.990 -999.990 1.943 ..P WKT 2011 04 16 08 19 55 31.3200 -97.3300 251.000 122.0 162.209 4.890 -999.990 -999.990 1.622 ..P WKT 2011 04 16 08 24 55 31.3200 -97.3300 251.000 457.0 150.088 3.960 -999.990 -999.990 1.501 ..P WKT 2011 04 16 08 34 55 31.3200 -97.3300 251.000 30.0 190.396 3.880 -999.990 -999.990 1.904 ..P WKT 2011 04 16 08 39 55 31.3200 -97.3300 251.000 122.0 159.535 5.530 -999.990 -999.990 1.595 ..P WKT 2011 04 16 08 44 55 31.3200 -97.3300 251.000 457.0 146.381 5.440 -999.990 -999.990 1.464 ..P WKT 2011 04 16 08 49 55 31.3200 -97.3300 251.000 30.0 183.732 5.300 -999.990 -999.990 1.837 ..P WKT 2011 04 16 08 54 55 31.3200 -97.3300 251.000 122.0 167.626 4.690 -999.990 -999.990 1.676 ..P WKT 2011 04 16 08 59 55 31.3200 -97.3300 251.000 457.0 145.944 5.620 -999.990 -999.990 1.459 ..P WKT 2011 04 16 09 09 55 31.3200 -97.3300 251.000 30.0 183.498 5.720 -999.990 -999.990 1.835 ..P WKT 2011 04 16 09 14 55 31.3200 -97.3300 251.000 122.0 168.608 5.620 -999.990 -999.990 1.686 ..P WKT 2011 04 16 09 19 55 31.3200 -97.3300 251.000 457.0 162.738 5.960 -999.990 -999.990 1.627 ..P WKT 2011 04 16 09 24 55 31.3200 -97.3300 251.000 30.0 192.460 5.240 -999.990 -999.990 1.925 ..P WKT 2011 04 16 09 29 55 31.3200 -97.3300 251.000 122.0 166.743 4.630 -999.990 -999.990 1.667 ..P WKT 2011 04 16 09 34 55 31.3200 -97.3300 251.000 457.0 159.232 4.740 -999.990 -999.990 1.592 ..P WKT 2011 04 16 09 44 55 31.3200 -97.3300 251.000 30.0 184.400 4.550 -999.990 -999.990 1.844 ..P WKT 2011 04 16 09 49 55 31.3200 -97.3300 251.000 122.0 159.663 4.570 -999.990 -999.990 1.597 ..P WKT 2011 04 16 09 54 55 31.3200 -97.3300 251.000 457.0 154.611 5.480 -999.990 -999.990 1.546 ..P WKT 2011 04 16 09 59 55 31.3200 -97.3300 251.000 30.0 181.880 4.450 -999.990 -999.990 1.819 ..P WKT 2011 04 16 10 04 55 31.3200 -97.3300 251.000 122.0 162.227 3.680 -999.990 -999.990 1.622 ..P WKT 2011 04 16 10 09 55 31.3200 -97.3300 251.000 457.0 150.776 4.220 -999.990 -999.990 1.508 ..P WKT 2011 04 16 10 19 55 31.3200 -97.3300 251.000 30.0 189.920 3.670 -999.990 -999.990 1.899 ..P WKT 2011 04 16 10 24 55 31.3200 -97.3300 251.000 122.0 158.801 4.890 -999.990 -999.990 1.588 ..P WKT 2011 04 16 10 29 55 31.3200 -97.3300 251.000 457.0 151.310 4.140 -999.990 -999.990 1.513 ..P WKT 2011 04 16 10 34 55 31.3200 -97.3300 251.000 30.0 183.204 3.760 -999.990 -999.990 1.832 ..P WKT 2011 04 16 10 39 55 31.3200 -97.3300 251.000 122.0 156.512 3.550 -999.990 -999.990 1.565 ..P WKT 2011 04 16 10 44 55 31.3200 -97.3300 251.000 457.0 149.513 3.830 -999.990 -999.990 1.495 ..P WKT 2011 04 16 10 54 55 31.3200 -97.3300 251.000 30.0 180.578 4.520 -999.990 -999.990 1.806 ..P WKT 2011 04 16 10 59 55 31.3200 -97.3300 251.000 122.0 151.349 3.730 -999.990 -999.990 1.513 ..P WKT 2011 04 16 11 04 55 31.3200 -97.3300 251.000 457.0 151.500 5.240 -999.990 -999.990 1.515 ..P WKT 2011 04 16 11 09 55 31.3200 -97.3300 251.000 30.0 190.062 3.610 -999.990 -999.990 1.901 ..P WKT 2011 04 16 11 14 55 31.3200 -97.3300 251.000 122.0 154.593 3.520 -999.990 -999.990 1.546 ..P WKT 2011 04 16 11 19 55 31.3200 -97.3300 251.000 457.0 148.178 3.460 -999.990 -999.990 1.482 ..P WKT 2011 04 16 11 29 55 31.3200 -97.3300 251.000 30.0 208.919 3.630 -999.990 -999.990 2.089 ..P WKT 2011 04 16 11 34 55 31.3200 -97.3300 251.000 122.0 163.947 3.390 -999.990 -999.990 1.639 ..P WKT 2011 04 16 11 39 55 31.3200 -97.3300 251.000 457.0 152.136 4.270 -999.990 -999.990 1.521 ..P WKT 2011 04 16 11 44 55 31.3200 -97.3300 251.000 30.0 194.180 3.690 -999.990 -999.990 1.942 ..P WKT 2011 04 16 11 49 55 31.3200 -97.3300 251.000 122.0 164.308 4.210 -999.990 -999.990 1.643 ..P WKT 2011 04 16 12 09 55 31.3200 -97.3300 251.000 457.0 159.296 3.230 -999.990 -999.990 1.593 ..P WKT 2011 04 16 12 10 25 31.3200 -97.3300 251.000 457.0 154.717 3.430 -999.990 -999.990 1.547 ..P WKT 2011 04 16 12 10 55 31.3200 -97.3300 251.000 457.0 156.379 3.590 -999.990 -999.990 1.564 ..P WKT 2011 04 16 12 11 25 31.3200 -97.3300 251.000 457.0 161.653 3.370 -999.990 -999.990 1.617 ..P WKT 2011 04 16 12 11 55 31.3200 -97.3300 251.000 457.0 153.135 3.120 -999.990 -999.990 1.531 ..P WKT 2011 04 16 12 12 25 31.3200 -97.3300 251.000 457.0 154.468 2.990 -999.990 -999.990 1.545 ..P WKT 2011 04 16 12 12 55 31.3200 -97.3300 251.000 457.0 152.189 3.510 -999.990 -999.990 1.522 ..P WKT 2011 04 16 12 13 25 31.3200 -97.3300 251.000 457.0 157.463 3.590 -999.990 -999.990 1.575 ..P WKT 2011 04 16 12 13 55 31.3200 -97.3300 251.000 457.0 153.214 3.010 -999.990 -999.990 1.532 ..P WKT 2011 04 16 12 14 25 31.3200 -97.3300 251.000 457.0 154.547 2.980 -999.990 -999.990 1.545 ..P WKT 2011 04 16 12 14 55 31.3200 -97.3300 251.000 457.0 151.939 3.010 -999.990 -999.990 1.519 ..P WKT 2011 04 16 12 19 55 31.3200 -97.3300 251.000 30.0 192.527 3.510 -999.990 -999.990 1.925 ..P WKT 2011 04 16 12 24 55 31.3200 -97.3300 251.000 122.0 169.408 4.970 -999.990 -999.990 1.694 ..P WKT 2011 04 16 12 29 55 31.3200 -97.3300 251.000 457.0 159.097 4.700 -999.990 -999.990 1.591 ..P WKT 2011 04 16 12 34 55 31.3200 -97.3300 251.000 30.0 195.741 4.250 -999.990 -999.990 1.957 ..P WKT 2011 04 16 12 39 55 31.3200 -97.3300 251.000 122.0 164.087 3.760 -999.990 -999.990 1.641 ..P WKT 2011 04 16 12 44 55 31.3200 -97.3300 251.000 457.0 158.373 2.970 -999.990 -999.990 1.584 ..P WKT 2011 04 16 12 54 55 31.3200 -97.3300 251.000 30.0 209.639 3.380 -999.990 -999.990 2.096 ..P WKT 2011 04 16 12 59 55 31.3200 -97.3300 251.000 122.0 164.836 3.370 -999.990 -999.990 1.648 ..P WKT 2011 04 16 13 04 55 31.3200 -97.3300 251.000 457.0 149.584 3.830 -999.990 -999.990 1.496 ..P WKT 2011 04 16 13 09 55 31.3200 -97.3300 251.000 30.0 202.619 4.270 -999.990 -999.990 2.026 ..P WKT 2011 04 16 13 14 55 31.3200 -97.3300 251.000 122.0 160.446 3.530 -999.990 -999.990 1.604 ..P WKT 2011 04 16 13 19 55 31.3200 -97.3300 251.000 457.0 152.746 3.070 -999.990 -999.990 1.527 ..P WKT 2011 04 16 13 29 55 31.3200 -97.3300 251.000 30.0 205.110 3.460 -999.990 -999.990 2.051 ..P WKT 2011 04 16 13 34 55 31.3200 -97.3300 251.000 122.0 158.487 3.580 -999.990 -999.990 1.585 ..P WKT 2011 04 16 13 39 55 31.3200 -97.3300 251.000 457.0 153.062 4.040 -999.990 -999.990 1.531 ..P WKT 2011 04 16 13 44 55 31.3200 -97.3300 251.000 30.0 204.094 3.610 -999.990 -999.990 2.041 ..P WKT 2011 04 16 13 49 55 31.3200 -97.3300 251.000 122.0 160.264 3.740 -999.990 -999.990 1.603 ..P WKT 2011 04 16 13 54 55 31.3200 -97.3300 251.000 457.0 151.393 2.980 -999.990 -999.990 1.514 ..P WKT 2011 04 16 14 04 55 31.3200 -97.3300 251.000 30.0 206.232 3.560 -999.990 -999.990 2.062 ..P WKT 2011 04 16 14 09 55 31.3200 -97.3300 251.000 122.0 159.829 3.720 -999.990 -999.990 1.598 ..P WKT 2011 04 16 14 14 55 31.3200 -97.3300 251.000 457.0 157.240 4.110 -999.990 -999.990 1.572 ..P WKT 2011 04 16 14 19 55 31.3200 -97.3300 251.000 30.0 198.630 3.720 -999.990 -999.990 1.986 ..P WKT 2011 04 16 14 24 55 31.3200 -97.3300 251.000 122.0 165.192 3.010 -999.990 -999.990 1.652 ..P WKT 2011 04 16 14 29 55 31.3200 -97.3300 251.000 457.0 162.275 3.390 -999.990 -999.990 1.623 ..P WKT 2011 04 16 14 39 55 31.3200 -97.3300 251.000 30.0 185.673 3.910 -999.990 -999.990 1.857 ..P WKT 2011 04 16 14 44 55 31.3200 -97.3300 251.000 122.0 165.060 2.990 -999.990 -999.990 1.651 ..P WKT 2011 04 16 14 49 55 31.3200 -97.3300 251.000 457.0 160.363 3.220 -999.990 -999.990 1.604 ..P WKT 2011 04 16 14 54 55 31.3200 -97.3300 251.000 30.0 168.791 3.390 -999.990 -999.990 1.688 ..P WKT 2011 04 16 14 59 55 31.3200 -97.3300 251.000 122.0 168.196 3.040 -999.990 -999.990 1.682 ..P WKT 2011 04 16 15 04 55 31.3200 -97.3300 251.000 457.0 155.789 3.610 -999.990 -999.990 1.558 ..P WKT 2011 04 16 15 14 55 31.3200 -97.3300 251.000 30.0 171.168 3.550 -999.990 -999.990 1.712 ..P WKT 2011 04 16 15 19 55 31.3200 -97.3300 251.000 122.0 170.900 2.690 -999.990 -999.990 1.709 ..P WKT 2011 04 16 15 24 55 31.3200 -97.3300 251.000 457.0 168.664 2.770 -999.990 -999.990 1.687 ..P WKT 2011 04 16 15 29 55 31.3200 -97.3300 251.000 30.0 163.804 2.650 -999.990 -999.990 1.638 ..P WKT 2011 04 16 15 34 55 31.3200 -97.3300 251.000 122.0 166.161 3.500 -999.990 -999.990 1.662 ..P WKT 2011 04 16 15 39 55 31.3200 -97.3300 251.000 457.0 164.582 2.540 -999.990 -999.990 1.646 ..P WKT 2011 04 16 15 49 55 31.3200 -97.3300 251.000 30.0 162.454 2.540 -999.990 -999.990 1.625 ..P WKT 2011 04 16 15 54 55 31.3200 -97.3300 251.000 122.0 164.531 3.640 -999.990 -999.990 1.645 ..P WKT 2011 04 16 15 59 55 31.3200 -97.3300 251.000 457.0 159.718 3.220 -999.990 -999.990 1.597 ..P WKT 2011 04 16 16 04 55 31.3200 -97.3300 251.000 30.0 161.466 3.630 -999.990 -999.990 1.615 ..P WKT 2011 04 16 16 09 55 31.3200 -97.3300 251.000 122.0 160.262 2.850 -999.990 -999.990 1.603 ..P WKT 2011 04 16 16 14 55 31.3200 -97.3300 251.000 457.0 164.306 2.870 -999.990 -999.990 1.643 ..P WKT 2011 04 16 16 24 55 31.3200 -97.3300 251.000 30.0 159.555 2.900 -999.990 -999.990 1.596 ..P WKT 2011 04 16 16 29 55 31.3200 -97.3300 251.000 122.0 166.175 2.780 -999.990 -999.990 1.662 ..P WKT 2011 04 16 16 34 55 31.3200 -97.3300 251.000 457.0 165.579 3.130 -999.990 -999.990 1.656 ..P WKT 2011 04 16 16 39 55 31.3200 -97.3300 251.000 30.0 154.162 2.840 -999.990 -999.990 1.542 ..P WKT 2011 04 16 16 44 55 31.3200 -97.3300 251.000 122.0 165.701 2.950 -999.990 -999.990 1.657 ..P WKT 2011 04 16 16 49 55 31.3200 -97.3300 251.000 457.0 158.548 2.850 -999.990 -999.990 1.585 ..P WKT 2011 04 16 17 04 55 31.3200 -97.3300 251.000 30.0 162.367 2.930 -999.990 -999.990 1.624 ..P WKT 2011 04 16 17 09 55 31.3200 -97.3300 251.000 122.0 161.786 2.970 -999.990 -999.990 1.618 ..P WKT 2011 04 16 17 14 55 31.3200 -97.3300 251.000 457.0 159.239 4.920 -999.990 -999.990 1.592 ..P WKT 2011 04 16 17 19 55 31.3200 -97.3300 251.000 30.0 160.462 4.480 -999.990 -999.990 1.605 ..P WKT 2011 04 16 17 24 55 31.3200 -97.3300 251.000 122.0 160.374 4.230 -999.990 -999.990 1.604 ..P WKT 2011 04 16 17 29 55 31.3200 -97.3300 251.000 457.0 160.777 3.270 -999.990 -999.990 1.608 ..P WKT 2011 04 16 17 39 55 31.3200 -97.3300 251.000 30.0 166.113 2.950 -999.990 -999.990 1.661 ..P WKT 2011 04 16 17 44 55 31.3200 -97.3300 251.000 122.0 166.126 2.770 -999.990 -999.990 1.661 ..P WKT 2011 04 16 17 49 55 31.3200 -97.3300 251.000 457.0 168.435 2.660 -999.990 -999.990 1.684 ..P WKT 2011 04 16 17 54 55 31.3200 -97.3300 251.000 30.0 166.974 3.350 -999.990 -999.990 1.670 ..P WKT 2011 04 16 17 59 55 31.3200 -97.3300 251.000 122.0 172.069 3.030 -999.990 -999.990 1.721 ..P WKT 2011 04 16 18 04 55 31.3200 -97.3300 251.000 457.0 165.527 4.020 -999.990 -999.990 1.655 ..P WKT 2011 04 16 18 14 55 31.3200 -97.3300 251.000 30.0 176.418 3.540 -999.990 -999.990 1.764 ..P WKT 2011 04 16 18 19 55 31.3200 -97.3300 251.000 122.0 172.545 2.980 -999.990 -999.990 1.725 ..P WKT 2011 04 16 18 24 55 31.3200 -97.3300 251.000 457.0 175.228 3.750 -999.990 -999.990 1.752 ..P WKT 2011 04 16 18 29 55 31.3200 -97.3300 251.000 30.0 169.389 5.130 -999.990 -999.990 1.694 ..P WKT 2011 04 16 18 34 55 31.3200 -97.3300 251.000 122.0 169.777 4.790 -999.990 -999.990 1.698 ..P WKT 2011 04 16 18 39 55 31.3200 -97.3300 251.000 457.0 174.918 4.940 -999.990 -999.990 1.749 ..P WKT 2011 04 16 18 49 55 31.3200 -97.3300 251.000 30.0 175.437 5.150 -999.990 -999.990 1.754 ..P WKT 2011 04 16 18 54 55 31.3200 -97.3300 251.000 122.0 174.093 4.690 -999.990 -999.990 1.741 ..P WKT 2011 04 16 18 59 55 31.3200 -97.3300 251.000 457.0 172.421 5.030 -999.990 -999.990 1.724 ..P WKT 2011 04 16 19 04 55 31.3200 -97.3300 251.000 30.0 167.637 5.930 -999.990 -999.990 1.676 ..P WKT 2011 04 16 19 09 55 31.3200 -97.3300 251.000 122.0 167.604 4.740 -999.990 -999.990 1.676 ..P WKT 2011 04 16 19 14 55 31.3200 -97.3300 251.000 457.0 162.819 3.310 -999.990 -999.990 1.628 ..P WKT 2011 04 16 19 24 55 31.3200 -97.3300 251.000 30.0 164.743 3.550 -999.990 -999.990 1.647 ..P WKT 2011 04 16 19 29 55 31.3200 -97.3300 251.000 122.0 161.949 5.460 -999.990 -999.990 1.619 ..P WKT 2011 04 16 19 34 55 31.3200 -97.3300 251.000 457.0 169.638 6.040 -999.990 -999.990 1.696 ..P WKT 2011 04 16 19 39 55 31.3200 -97.3300 251.000 30.0 159.309 4.580 -999.990 -999.990 1.593 ..P WKT 2011 04 16 19 44 55 31.3200 -97.3300 251.000 122.0 165.361 3.800 -999.990 -999.990 1.654 ..P WKT 2011 04 16 19 49 55 31.3200 -97.3300 251.000 457.0 166.825 3.180 -999.990 -999.990 1.668 ..P WKT 2011 04 16 19 59 55 31.3200 -97.3300 251.000 30.0 168.912 2.780 -999.990 -999.990 1.689 ..P WKT 2011 04 16 20 04 55 31.3200 -97.3300 251.000 122.0 163.965 3.760 -999.990 -999.990 1.640 ..P WKT 2011 04 16 20 09 55 31.3200 -97.3300 251.000 457.0 164.260 2.450 -999.990 -999.990 1.643 ..P WKT 2011 04 16 20 14 55 31.3200 -97.3300 251.000 30.0 154.401 2.770 -999.990 -999.990 1.544 ..P WKT 2011 04 16 20 19 55 31.3200 -97.3300 251.000 122.0 160.919 3.590 -999.990 -999.990 1.609 ..P WKT 2011 04 16 20 24 55 31.3200 -97.3300 251.000 457.0 160.886 2.140 -999.990 -999.990 1.609 ..P WKT 2011 04 16 20 34 55 31.3200 -97.3300 251.000 30.0 162.108 2.220 -999.990 -999.990 1.621 ..P WKT 2011 04 16 20 39 55 31.3200 -97.3300 251.000 122.0 163.034 2.470 -999.990 -999.990 1.630 ..P WKT 2011 04 16 20 44 55 31.3200 -97.3300 251.000 457.0 160.686 2.570 -999.990 -999.990 1.607 ..P WKT 2011 04 16 20 49 55 31.3200 -97.3300 251.000 30.0 161.612 3.610 -999.990 -999.990 1.616 ..P WKT 2011 04 16 20 54 55 31.3200 -97.3300 251.000 122.0 160.246 2.920 -999.990 -999.990 1.602 ..P WKT 2011 04 16 20 59 55 31.3200 -97.3300 251.000 457.0 157.571 3.780 -999.990 -999.990 1.576 ..P WKT 2011 04 16 21 09 55 31.3200 -97.3300 251.000 30.0 164.826 4.510 -999.990 -999.990 1.648 ..P WKT 2011 04 16 21 14 55 31.3200 -97.3300 251.000 122.0 164.933 3.070 -999.990 -999.990 1.649 ..P WKT 2011 04 16 21 19 55 31.3200 -97.3300 251.000 457.0 166.515 2.990 -999.990 -999.990 1.665 ..P WKT 2011 04 16 21 24 55 31.3200 -97.3300 251.000 30.0 170.551 2.860 -999.990 -999.990 1.706 ..P WKT 2011 04 16 21 29 55 31.3200 -97.3300 251.000 122.0 165.255 3.170 -999.990 -999.990 1.653 ..P WKT 2011 04 16 21 34 55 31.3200 -97.3300 251.000 457.0 160.452 2.130 -999.990 -999.990 1.605 ..P WKT 2011 04 16 21 44 55 31.3200 -97.3300 251.000 30.0 164.689 1.940 -999.990 -999.990 1.647 ..P WKT 2011 04 16 21 49 55 31.3200 -97.3300 251.000 122.0 162.271 2.550 -999.990 -999.990 1.623 ..P WKT 2011 04 16 21 54 55 31.3200 -97.3300 251.000 457.0 156.088 2.510 -999.990 -999.990 1.561 ..P WKT 2011 04 16 21 59 55 31.3200 -97.3300 251.000 30.0 163.328 3.360 -999.990 -999.990 1.633 ..P WKT 2011 04 16 22 04 55 31.3200 -97.3300 251.000 122.0 158.455 3.260 -999.990 -999.990 1.585 ..P WKT 2011 04 16 22 09 55 31.3200 -97.3300 251.000 457.0 157.183 3.370 -999.990 -999.990 1.572 ..P WKT 2011 04 16 22 19 55 31.3200 -97.3300 251.000 30.0 157.259 2.930 -999.990 -999.990 1.573 ..P WKT 2011 04 16 22 24 55 31.3200 -97.3300 251.000 122.0 155.332 3.020 -999.990 -999.990 1.553 ..P WKT 2011 04 16 22 29 55 31.3200 -97.3300 251.000 457.0 155.370 3.530 -999.990 -999.990 1.554 ..P WKT 2011 04 16 22 34 55 31.3200 -97.3300 251.000 30.0 165.226 4.210 -999.990 -999.990 1.652 ..P WKT 2011 04 16 22 39 55 31.3200 -97.3300 251.000 122.0 156.263 2.230 -999.990 -999.990 1.563 ..P WKT 2011 04 16 22 44 55 31.3200 -97.3300 251.000 457.0 162.028 2.360 -999.990 -999.990 1.620 ..P WKT 2011 04 16 22 54 55 31.3200 -97.3300 251.000 30.0 161.659 2.540 -999.990 -999.990 1.617 ..P WKT 2011 04 16 22 59 55 31.3200 -97.3300 251.000 122.0 157.816 3.080 -999.990 -999.990 1.578 ..P WKT 2011 04 16 23 04 55 31.3200 -97.3300 251.000 457.0 163.299 3.260 -999.990 -999.990 1.633 ..P WKT 2011 04 16 23 09 55 31.3200 -97.3300 251.000 30.0 163.220 2.200 -999.990 -999.990 1.632 ..P WKT 2011 04 16 23 14 55 31.3200 -97.3300 251.000 122.0 165.104 2.400 -999.990 -999.990 1.651 ..P WKT 2011 04 16 23 19 55 31.3200 -97.3300 251.000 457.0 164.370 2.270 -999.990 -999.990 1.644 ..P WKT 2011 04 16 23 29 55 31.3200 -97.3300 251.000 30.0 163.118 2.730 -999.990 -999.990 1.631 ..P WKT 2011 04 16 23 34 55 31.3200 -97.3300 251.000 122.0 158.347 2.980 -999.990 -999.990 1.583 ..P WKT 2011 04 16 23 39 55 31.3200 -97.3300 251.000 457.0 157.175 2.300 -999.990 -999.990 1.572 ..P WKT 2011 04 16 23 44 55 31.3200 -97.3300 251.000 30.0 161.565 2.530 -999.990 -999.990 1.616 ..P WKT 2011 04 16 23 49 55 31.3200 -97.3300 251.000 122.0 161.047 3.060 -999.990 -999.990 1.610 ..P WKT 2011 04 17 00 09 55 31.3200 -97.3300 251.000 457.0 158.624 3.290 -999.990 -999.990 1.586 ..P WKT 2011 04 17 00 10 25 31.3200 -97.3300 251.000 457.0 161.550 4.930 -999.990 -999.990 1.616 ..P WKT 2011 04 17 00 10 55 31.3200 -97.3300 251.000 457.0 159.896 4.170 -999.990 -999.990 1.599 ..P WKT 2011 04 17 00 11 25 31.3200 -97.3300 251.000 457.0 158.569 2.830 -999.990 -999.990 1.586 ..P WKT 2011 04 17 00 11 55 31.3200 -97.3300 251.000 457.0 155.279 3.890 -999.990 -999.990 1.553 ..P WKT 2011 04 17 00 12 25 31.3200 -97.3300 251.000 457.0 157.551 2.570 -999.990 -999.990 1.576 ..P WKT 2011 04 17 00 12 55 31.3200 -97.3300 251.000 457.0 156.878 2.710 -999.990 -999.990 1.569 ..P WKT 2011 04 17 00 13 25 31.3200 -97.3300 251.000 457.0 164.059 3.070 -999.990 -999.990 1.641 ..P WKT 2011 04 17 00 13 55 31.3200 -97.3300 251.000 457.0 159.787 2.930 -999.990 -999.990 1.598 ..P WKT 2011 04 17 00 14 25 31.3200 -97.3300 251.000 457.0 162.714 4.490 -999.990 -999.990 1.627 ..P WKT 2011 04 17 00 14 55 31.3200 -97.3300 251.000 457.0 159.751 2.680 -999.990 -999.990 1.598 ..P WKT 2011 04 17 00 19 55 31.3200 -97.3300 251.000 30.0 155.970 2.420 -999.990 -999.990 1.560 ..P WKT 2011 04 17 00 24 55 31.3200 -97.3300 251.000 122.0 161.351 2.340 -999.990 -999.990 1.614 ..P WKT 2011 04 17 00 29 55 31.3200 -97.3300 251.000 457.0 153.969 2.150 -999.990 -999.990 1.540 ..P WKT 2011 04 17 00 34 55 31.3200 -97.3300 251.000 30.0 156.406 3.860 -999.990 -999.990 1.564 ..P WKT 2011 04 17 00 39 55 31.3200 -97.3300 251.000 122.0 161.135 2.490 -999.990 -999.990 1.611 ..P WKT 2011 04 17 00 44 55 31.3200 -97.3300 251.000 457.0 158.661 1.810 -999.990 -999.990 1.587 ..P WKT 2011 04 17 00 54 55 31.3200 -97.3300 251.000 30.0 162.502 2.070 -999.990 -999.990 1.625 ..P WKT 2011 04 17 00 59 55 31.3200 -97.3300 251.000 122.0 156.374 4.350 -999.990 -999.990 1.564 ..P WKT 2011 04 17 01 04 55 31.3200 -97.3300 251.000 457.0 157.450 3.440 -999.990 -999.990 1.575 ..P WKT 2011 04 17 01 09 55 31.3200 -97.3300 251.000 30.0 159.509 3.670 -999.990 -999.990 1.595 ..P WKT 2011 04 17 01 14 55 31.3200 -97.3300 251.000 122.0 158.292 4.060 -999.990 -999.990 1.583 ..P WKT 2011 04 17 01 19 55 31.3200 -97.3300 251.000 457.0 158.714 4.250 -999.990 -999.990 1.587 ..P WKT 2011 04 17 01 29 55 31.3200 -97.3300 251.000 30.0 159.135 4.980 -999.990 -999.990 1.591 ..P WKT 2011 04 17 01 34 55 31.3200 -97.3300 251.000 122.0 155.039 3.840 -999.990 -999.990 1.550 ..P WKT 2011 04 17 01 39 55 31.3200 -97.3300 251.000 457.0 162.411 4.100 -999.990 -999.990 1.624 ..P WKT 2011 04 17 01 44 55 31.3200 -97.3300 251.000 30.0 158.971 3.720 -999.990 -999.990 1.590 ..P WKT 2011 04 17 01 49 55 31.3200 -97.3300 251.000 122.0 162.904 3.350 -999.990 -999.990 1.629 ..P WKT 2011 04 17 01 54 55 31.3200 -97.3300 251.000 457.0 160.610 3.510 -999.990 -999.990 1.606 ..P WKT 2011 04 17 02 04 55 31.3200 -97.3300 251.000 30.0 159.744 3.910 -999.990 -999.990 1.597 ..P WKT 2011 04 17 02 09 55 31.3200 -97.3300 251.000 122.0 162.484 3.370 -999.990 -999.990 1.625 ..P WKT 2011 04 17 02 14 55 31.3200 -97.3300 251.000 457.0 168.174 3.030 -999.990 -999.990 1.682 ..P WKT 2011 04 17 02 19 55 31.3200 -97.3300 251.000 30.0 160.260 3.870 -999.990 -999.990 1.603 ..P WKT 2011 04 17 02 24 55 31.3200 -97.3300 251.000 122.0 153.164 3.170 -999.990 -999.990 1.532 ..P WKT 2011 04 17 02 29 55 31.3200 -97.3300 251.000 457.0 159.675 2.620 -999.990 -999.990 1.597 ..P WKT 2011 04 17 02 39 55 31.3200 -97.3300 251.000 30.0 162.861 3.590 -999.990 -999.990 1.629 ..P WKT 2011 04 17 02 44 55 31.3200 -97.3300 251.000 122.0 161.339 2.760 -999.990 -999.990 1.613 ..P WKT 2011 04 17 02 49 55 31.3200 -97.3300 251.000 457.0 168.672 2.910 -999.990 -999.990 1.687 ..P WKT 2011 04 17 02 54 55 31.3200 -97.3300 251.000 30.0 159.278 2.200 -999.990 -999.990 1.593 ..P WKT 2011 04 17 02 59 55 31.3200 -97.3300 251.000 122.0 162.675 2.670 -999.990 -999.990 1.627 ..P WKT 2011 04 17 03 04 55 31.3200 -97.3300 251.000 457.0 164.761 3.080 -999.990 -999.990 1.648 ..P WKT 2011 04 17 03 14 55 31.3200 -97.3300 251.000 30.0 164.059 2.290 -999.990 -999.990 1.641 ..P WKT 2011 04 17 03 19 55 31.3200 -97.3300 251.000 122.0 167.341 5.430 -999.990 -999.990 1.673 ..P WKT 2011 04 17 03 24 55 31.3200 -97.3300 251.000 457.0 173.249 2.370 -999.990 -999.990 1.732 ..P WKT 2011 04 17 03 29 55 31.3200 -97.3300 251.000 30.0 165.045 5.720 -999.990 -999.990 1.650 ..P WKT 2011 04 17 03 34 55 31.3200 -97.3300 251.000 122.0 164.389 3.230 -999.990 -999.990 1.644 ..P WKT 2011 04 17 03 39 55 31.3200 -97.3300 251.000 457.0 175.550 2.700 -999.990 -999.990 1.756 ..P WKT 2011 04 17 03 49 55 31.3200 -97.3300 251.000 30.0 169.269 2.840 -999.990 -999.990 1.693 ..P WKT 2011 04 17 03 54 55 31.3200 -97.3300 251.000 122.0 165.282 3.070 -999.990 -999.990 1.653 ..P WKT 2011 04 17 03 59 55 31.3200 -97.3300 251.000 457.0 161.953 2.760 -999.990 -999.990 1.620 ..P WKT 2011 04 17 04 04 55 31.3200 -97.3300 251.000 30.0 174.056 4.810 -999.990 -999.990 1.741 ..P WKT 2011 04 17 04 09 55 31.3200 -97.3300 251.000 122.0 167.442 3.680 -999.990 -999.990 1.674 ..P WKT 2011 04 17 04 14 55 31.3200 -97.3300 251.000 457.0 164.440 3.340 -999.990 -999.990 1.644 ..P WKT 2011 04 17 04 24 55 31.3200 -97.3300 251.000 30.0 162.892 2.700 -999.990 -999.990 1.629 ..P WKT 2011 04 17 04 29 55 31.3200 -97.3300 251.000 122.0 167.633 2.250 -999.990 -999.990 1.676 ..P WKT 2011 04 17 04 34 55 31.3200 -97.3300 251.000 457.0 173.688 2.430 -999.990 -999.990 1.737 ..P WKT 2011 04 17 04 39 55 31.3200 -97.3300 251.000 30.0 168.573 2.080 -999.990 -999.990 1.686 ..P WKT 2011 04 17 04 44 55 31.3200 -97.3300 251.000 122.0 171.343 3.640 -999.990 -999.990 1.713 ..P WKT 2011 04 17 04 49 55 31.3200 -97.3300 251.000 457.0 175.100 2.910 -999.990 -999.990 1.751 ..P WKT 2011 04 17 05 04 55 31.3200 -97.3300 251.000 30.0 167.356 2.700 -999.990 -999.990 1.674 ..P WKT 2011 04 17 05 09 55 31.3200 -97.3300 251.000 122.0 163.824 2.250 -999.990 -999.990 1.638 ..P WKT 2011 04 17 05 14 55 31.3200 -97.3300 251.000 457.0 179.357 2.990 -999.990 -999.990 1.794 ..P WKT 2011 04 17 05 19 55 31.3200 -97.3300 251.000 30.0 171.222 5.110 -999.990 -999.990 1.712 ..P WKT 2011 04 17 05 24 55 31.3200 -97.3300 251.000 122.0 171.469 3.370 -999.990 -999.990 1.715 ..P WKT 2011 04 17 05 29 55 31.3200 -97.3300 251.000 457.0 183.225 2.420 -999.990 -999.990 1.832 ..P WKT 2011 04 17 05 39 55 31.3200 -97.3300 251.000 30.0 161.395 2.860 -999.990 -999.990 1.614 ..P WKT 2011 04 17 05 44 55 31.3200 -97.3300 251.000 122.0 165.460 3.130 -999.990 -999.990 1.655 ..P WKT 2011 04 17 05 49 55 31.3200 -97.3300 251.000 457.0 177.583 3.470 -999.990 -999.990 1.776 ..P WKT 2011 04 17 05 54 55 31.3200 -97.3300 251.000 30.0 164.709 2.640 -999.990 -999.990 1.647 ..P WKT 2011 04 17 05 59 55 31.3200 -97.3300 251.000 122.0 163.675 2.940 -999.990 -999.990 1.637 ..P WKT 2011 04 17 06 04 55 31.3200 -97.3300 251.000 457.0 186.000 3.440 -999.990 -999.990 1.860 ..P WKT 2011 04 17 06 14 55 31.3200 -97.3300 251.000 30.0 176.391 3.370 -999.990 -999.990 1.764 ..P WKT 2011 04 17 06 19 55 31.3200 -97.3300 251.000 122.0 189.697 3.130 -999.990 -999.990 1.897 ..P WKT 2011 04 17 06 24 55 31.3200 -97.3300 251.000 457.0 207.446 3.060 -999.990 -999.990 2.074 ..P WKT 2011 04 17 06 29 55 31.3200 -97.3300 251.000 30.0 172.541 2.950 -999.990 -999.990 1.725 ..P WKT 2011 04 17 06 34 55 31.3200 -97.3300 251.000 122.0 198.026 3.100 -999.990 -999.990 1.980 ..P WKT 2011 04 17 06 39 55 31.3200 -97.3300 251.000 457.0 213.970 3.300 -999.990 -999.990 2.140 ..P WKT 2011 04 17 06 49 55 31.3200 -97.3300 251.000 30.0 178.423 3.670 -999.990 -999.990 1.784 ..P WKT 2011 04 17 06 54 55 31.3200 -97.3300 251.000 122.0 205.611 4.360 -999.990 -999.990 2.056 ..P WKT 2011 04 17 06 59 55 31.3200 -97.3300 251.000 457.0 218.314 2.920 -999.990 -999.990 2.183 ..P WKT 2011 04 17 07 04 55 31.3200 -97.3300 251.000 30.0 180.639 3.320 -999.990 -999.990 1.806 ..P WKT 2011 04 17 07 09 55 31.3200 -97.3300 251.000 122.0 211.784 2.760 -999.990 -999.990 2.118 ..P WKT 2011 04 17 07 14 55 31.3200 -97.3300 251.000 457.0 221.198 3.010 -999.990 -999.990 2.212 ..P WKT 2011 04 17 07 24 55 31.3200 -97.3300 251.000 30.0 199.139 3.100 -999.990 -999.990 1.991 ..P WKT 2011 04 17 07 29 55 31.3200 -97.3300 251.000 122.0 236.177 3.120 -999.990 -999.990 2.362 ..P WKT 2011 04 17 07 34 55 31.3200 -97.3300 251.000 457.0 208.322 2.960 -999.990 -999.990 2.083 ..P WKT 2011 04 17 07 39 55 31.3200 -97.3300 251.000 30.0 208.137 3.480 -999.990 -999.990 2.081 ..P WKT 2011 04 17 07 44 55 31.3200 -97.3300 251.000 122.0 227.063 3.270 -999.990 -999.990 2.271 ..P WKT 2011 04 17 07 49 55 31.3200 -97.3300 251.000 457.0 209.745 5.120 -999.990 -999.990 2.097 ..P WKT 2011 04 17 07 59 55 31.3200 -97.3300 251.000 30.0 225.289 3.220 -999.990 -999.990 2.253 ..P WKT 2011 04 17 08 04 55 31.3200 -97.3300 251.000 122.0 210.699 3.520 -999.990 -999.990 2.107 ..P WKT 2011 04 17 08 09 55 31.3200 -97.3300 251.000 457.0 205.665 2.600 -999.990 -999.990 2.057 ..P WKT 2011 04 17 08 14 55 31.3200 -97.3300 251.000 30.0 238.207 3.270 -999.990 -999.990 2.382 ..P WKT 2011 04 17 08 19 55 31.3200 -97.3300 251.000 122.0 214.055 2.900 -999.990 -999.990 2.141 ..P WKT 2011 04 17 08 24 55 31.3200 -97.3300 251.000 457.0 203.415 4.250 -999.990 -999.990 2.034 ..P WKT 2011 04 17 08 34 55 31.3200 -97.3300 251.000 30.0 290.377 3.450 -999.990 -999.990 2.904 ..P WKT 2011 04 17 08 39 55 31.3200 -97.3300 251.000 122.0 211.245 3.290 -999.990 -999.990 2.112 ..P WKT 2011 04 17 08 44 55 31.3200 -97.3300 251.000 457.0 208.611 2.690 -999.990 -999.990 2.086 ..P WKT 2011 04 17 08 49 55 31.3200 -97.3300 251.000 30.0 264.023 4.430 -999.990 -999.990 2.640 ..P WKT 2011 04 17 08 54 55 31.3200 -97.3300 251.000 122.0 204.331 3.120 -999.990 -999.990 2.043 ..P WKT 2011 04 17 08 59 55 31.3200 -97.3300 251.000 457.0 211.592 4.020 -999.990 -999.990 2.116 ..P WKT 2011 04 17 09 09 55 31.3200 -97.3300 251.000 30.0 266.458 4.570 -999.990 -999.990 2.665 ..P WKT 2011 04 17 09 14 55 31.3200 -97.3300 251.000 122.0 197.605 2.830 -999.990 -999.990 1.976 ..P WKT 2011 04 17 09 19 55 31.3200 -97.3300 251.000 457.0 214.860 3.340 -999.990 -999.990 2.149 ..P WKT 2011 04 17 09 24 55 31.3200 -97.3300 251.000 30.0 259.011 2.980 -999.990 -999.990 2.590 ..P WKT 2011 04 17 09 29 55 31.3200 -97.3300 251.000 122.0 183.376 3.090 -999.990 -999.990 1.834 ..P WKT 2011 04 17 09 34 55 31.3200 -97.3300 251.000 457.0 211.030 2.860 -999.990 -999.990 2.110 ..P WKT 2011 04 17 09 44 55 31.3200 -97.3300 251.000 30.0 266.163 4.300 -999.990 -999.990 2.662 ..P WKT 2011 04 17 09 49 55 31.3200 -97.3300 251.000 122.0 173.646 2.660 -999.990 -999.990 1.736 ..P WKT 2011 04 17 09 54 55 31.3200 -97.3300 251.000 457.0 186.923 4.060 -999.990 -999.990 1.869 ..P WKT 2011 04 17 09 59 55 31.3200 -97.3300 251.000 30.0 245.929 4.930 -999.990 -999.990 2.459 ..P WKT 2011 04 17 10 04 55 31.3200 -97.3300 251.000 122.0 172.871 3.960 -999.990 -999.990 1.729 ..P WKT 2011 04 17 10 09 55 31.3200 -97.3300 251.000 457.0 194.407 4.920 -999.990 -999.990 1.944 ..P WKT 2011 04 17 10 19 55 31.3200 -97.3300 251.000 30.0 215.549 4.990 -999.990 -999.990 2.155 ..P WKT 2011 04 17 10 24 55 31.3200 -97.3300 251.000 122.0 169.903 4.400 -999.990 -999.990 1.699 ..P WKT 2011 04 17 10 29 55 31.3200 -97.3300 251.000 457.0 199.726 4.890 -999.990 -999.990 1.997 ..P WKT 2011 04 17 10 34 55 31.3200 -97.3300 251.000 30.0 217.332 4.380 -999.990 -999.990 2.173 ..P WKT 2011 04 17 10 39 55 31.3200 -97.3300 251.000 122.0 169.198 3.750 -999.990 -999.990 1.692 ..P WKT 2011 04 17 10 44 55 31.3200 -97.3300 251.000 457.0 203.653 4.240 -999.990 -999.990 2.037 ..P WKT 2011 04 17 10 54 55 31.3200 -97.3300 251.000 30.0 207.767 4.470 -999.990 -999.990 2.078 ..P WKT 2011 04 17 10 59 55 31.3200 -97.3300 251.000 122.0 174.607 3.410 -999.990 -999.990 1.746 ..P WKT 2011 04 17 11 04 55 31.3200 -97.3300 251.000 457.0 195.972 4.190 -999.990 -999.990 1.960 ..P WKT 2011 04 17 11 09 55 31.3200 -97.3300 251.000 30.0 208.416 3.720 -999.990 -999.990 2.084 ..P WKT 2011 04 17 11 14 55 31.3200 -97.3300 251.000 122.0 175.249 3.560 -999.990 -999.990 1.752 ..P WKT 2011 04 17 11 19 55 31.3200 -97.3300 251.000 457.0 192.981 4.760 -999.990 -999.990 1.930 ..P WKT 2011 04 17 11 29 55 31.3200 -97.3300 251.000 30.0 202.663 3.740 -999.990 -999.990 2.027 ..P WKT 2011 04 17 11 34 55 31.3200 -97.3300 251.000 122.0 162.536 4.340 -999.990 -999.990 1.625 ..P WKT 2011 04 17 11 39 55 31.3200 -97.3300 251.000 457.0 189.196 5.030 -999.990 -999.990 1.892 ..P WKT 2011 04 17 11 44 55 31.3200 -97.3300 251.000 30.0 197.011 5.640 -999.990 -999.990 1.970 ..P WKT 2011 04 17 11 49 55 31.3200 -97.3300 251.000 122.0 163.157 4.130 -999.990 -999.990 1.632 ..P WKT 2011 04 17 12 09 55 31.3200 -97.3300 251.000 457.0 204.904 4.460 -999.990 -999.990 2.049 ..P WKT 2011 04 17 12 10 25 31.3200 -97.3300 251.000 457.0 199.952 4.260 -999.990 -999.990 2.000 ..P WKT 2011 04 17 12 10 55 31.3200 -97.3300 251.000 457.0 200.624 4.180 -999.990 -999.990 2.006 ..P WKT 2011 04 17 12 11 25 31.3200 -97.3300 251.000 457.0 204.935 5.070 -999.990 -999.990 2.049 ..P WKT 2011 04 17 12 11 55 31.3200 -97.3300 251.000 457.0 202.629 4.800 -999.990 -999.990 2.026 ..P WKT 2011 04 17 12 12 25 31.3200 -97.3300 251.000 457.0 203.301 4.270 -999.990 -999.990 2.033 ..P WKT 2011 04 17 12 12 55 31.3200 -97.3300 251.000 457.0 203.643 4.760 -999.990 -999.990 2.036 ..P WKT 2011 04 17 12 13 25 31.3200 -97.3300 251.000 457.0 206.961 4.130 -999.990 -999.990 2.070 ..P WKT 2011 04 17 12 13 55 31.3200 -97.3300 251.000 457.0 201.346 4.490 -999.990 -999.990 2.013 ..P WKT 2011 04 17 12 14 25 31.3200 -97.3300 251.000 457.0 204.666 4.180 -999.990 -999.990 2.047 ..P WKT 2011 04 17 12 14 55 31.3200 -97.3300 251.000 457.0 203.352 4.140 -999.990 -999.990 2.034 ..P WKT 2011 04 17 12 19 55 31.3200 -97.3300 251.000 30.0 243.166 3.960 -999.990 -999.990 2.432 ..P WKT 2011 04 17 12 24 55 31.3200 -97.3300 251.000 122.0 162.186 3.640 -999.990 -999.990 1.622 ..P WKT 2011 04 17 12 29 55 31.3200 -97.3300 251.000 457.0 200.349 3.310 -999.990 -999.990 2.003 ..P WKT 2011 04 17 12 34 55 31.3200 -97.3300 251.000 30.0 272.621 3.560 -999.990 -999.990 2.726 ..P WKT 2011 04 17 12 39 55 31.3200 -97.3300 251.000 122.0 157.511 2.820 -999.990 -999.990 1.575 ..P WKT 2011 04 17 12 44 55 31.3200 -97.3300 251.000 457.0 199.331 3.900 -999.990 -999.990 1.993 ..P WKT 2011 04 17 12 54 55 31.3200 -97.3300 251.000 30.0 262.043 4.460 -999.990 -999.990 2.620 ..P WKT 2011 04 17 12 59 55 31.3200 -97.3300 251.000 122.0 158.210 3.260 -999.990 -999.990 1.582 ..P WKT 2011 04 17 13 04 55 31.3200 -97.3300 251.000 457.0 193.996 2.850 -999.990 -999.990 1.940 ..P WKT 2011 04 17 13 09 55 31.3200 -97.3300 251.000 30.0 309.314 4.320 -999.990 -999.990 3.093 ..P WKT 2011 04 17 13 14 55 31.3200 -97.3300 251.000 122.0 159.715 4.080 -999.990 -999.990 1.597 ..P WKT 2011 04 17 13 19 55 31.3200 -97.3300 251.000 457.0 215.732 3.090 -999.990 -999.990 2.157 ..P WKT 2011 04 17 13 29 55 31.3200 -97.3300 251.000 30.0 228.165 3.980 -999.990 -999.990 2.282 ..P WKT 2011 04 17 13 34 55 31.3200 -97.3300 251.000 122.0 156.870 3.150 -999.990 -999.990 1.569 ..P WKT 2011 04 17 13 39 55 31.3200 -97.3300 251.000 457.0 202.445 5.620 -999.990 -999.990 2.024 ..P WKT 2011 04 17 13 44 55 31.3200 -97.3300 251.000 30.0 228.963 4.420 -999.990 -999.990 2.290 ..P WKT 2011 04 17 13 49 55 31.3200 -97.3300 251.000 122.0 157.972 3.840 -999.990 -999.990 1.580 ..P WKT 2011 04 17 13 54 55 31.3200 -97.3300 251.000 457.0 192.122 4.460 -999.990 -999.990 1.921 ..P WKT 2011 04 17 14 04 55 31.3200 -97.3300 251.000 30.0 222.098 4.350 -999.990 -999.990 2.221 ..P WKT 2011 04 17 14 09 55 31.3200 -97.3300 251.000 122.0 172.119 3.710 -999.990 -999.990 1.721 ..P WKT 2011 04 17 14 14 55 31.3200 -97.3300 251.000 457.0 192.324 4.310 -999.990 -999.990 1.923 ..P WKT 2011 04 17 14 19 55 31.3200 -97.3300 251.000 30.0 225.978 4.980 -999.990 -999.990 2.260 ..P WKT 2011 04 17 14 24 55 31.3200 -97.3300 251.000 122.0 209.345 5.020 -999.990 -999.990 2.093 ..P WKT 2011 04 17 14 29 55 31.3200 -97.3300 251.000 457.0 192.374 3.710 -999.990 -999.990 1.924 ..P WKT 2011 04 17 14 39 55 31.3200 -97.3300 251.000 30.0 226.529 4.390 -999.990 -999.990 2.265 ..P WKT 2011 04 17 14 44 55 31.3200 -97.3300 251.000 122.0 202.770 5.270 -999.990 -999.990 2.028 ..P WKT 2011 04 17 14 49 55 31.3200 -97.3300 251.000 457.0 193.954 4.810 -999.990 -999.990 1.940 ..P WKT 2011 04 17 14 54 55 31.3200 -97.3300 251.000 30.0 207.561 4.250 -999.990 -999.990 2.076 ..P WKT 2011 04 17 14 59 55 31.3200 -97.3300 251.000 122.0 200.903 4.370 -999.990 -999.990 2.009 ..P WKT 2011 04 17 15 04 55 31.3200 -97.3300 251.000 457.0 197.899 4.030 -999.990 -999.990 1.979 ..P WKT 2011 04 17 15 14 55 31.3200 -97.3300 251.000 30.0 219.690 3.830 -999.990 -999.990 2.197 ..P WKT 2011 04 17 15 19 55 31.3200 -97.3300 251.000 122.0 218.896 3.790 -999.990 -999.990 2.189 ..P WKT 2011 04 17 15 24 55 31.3200 -97.3300 251.000 457.0 194.826 3.890 -999.990 -999.990 1.948 ..P WKT 2011 04 17 15 29 55 31.3200 -97.3300 251.000 30.0 183.387 3.630 -999.990 -999.990 1.834 ..P WKT 2011 04 17 15 34 55 31.3200 -97.3300 251.000 122.0 182.920 3.920 -999.990 -999.990 1.829 ..P WKT 2011 04 17 15 39 55 31.3200 -97.3300 251.000 457.0 186.776 3.280 -999.990 -999.990 1.868 ..P WKT 2011 04 17 15 49 55 31.3200 -97.3300 251.000 30.0 177.667 4.670 -999.990 -999.990 1.777 ..P WKT 2011 04 17 15 54 55 31.3200 -97.3300 251.000 122.0 179.339 3.720 -999.990 -999.990 1.793 ..P WKT 2011 04 17 15 59 55 31.3200 -97.3300 251.000 457.0 173.689 5.330 -999.990 -999.990 1.737 ..P WKT 2011 04 17 16 04 55 31.3200 -97.3300 251.000 30.0 176.690 5.110 -999.990 -999.990 1.767 ..P WKT 2011 04 17 16 09 55 31.3200 -97.3300 251.000 122.0 184.021 4.270 -999.990 -999.990 1.840 ..P WKT 2011 04 17 16 14 55 31.3200 -97.3300 251.000 457.0 175.707 4.390 -999.990 -999.990 1.757 ..P WKT 2011 04 17 16 24 55 31.3200 -97.3300 251.000 30.0 173.723 4.280 -999.990 -999.990 1.737 ..P WKT 2011 04 17 16 29 55 31.3200 -97.3300 251.000 122.0 175.394 5.150 -999.990 -999.990 1.754 ..P WKT 2011 04 17 16 34 55 31.3200 -97.3300 251.000 457.0 174.734 3.870 -999.990 -999.990 1.747 ..P WKT 2011 04 17 16 39 55 31.3200 -97.3300 251.000 30.0 175.741 3.540 -999.990 -999.990 1.757 ..P WKT 2011 04 17 16 44 55 31.3200 -97.3300 251.000 122.0 180.412 4.060 -999.990 -999.990 1.804 ..P WKT 2011 04 17 16 49 55 31.3200 -97.3300 251.000 457.0 191.582 3.620 -999.990 -999.990 1.916 ..P WKT 2011 04 17 17 04 55 31.3200 -97.3300 251.000 30.0 184.317 3.150 -999.990 -999.990 1.843 ..P WKT 2011 04 17 17 09 55 31.3200 -97.3300 251.000 122.0 181.429 3.100 -999.990 -999.990 1.814 ..P WKT 2011 04 17 17 14 55 31.3200 -97.3300 251.000 457.0 183.375 4.240 -999.990 -999.990 1.834 ..P WKT 2011 04 17 17 19 55 31.3200 -97.3300 251.000 30.0 191.657 3.700 -999.990 -999.990 1.917 ..P WKT 2011 04 17 17 24 55 31.3200 -97.3300 251.000 122.0 188.101 3.220 -999.990 -999.990 1.881 ..P WKT 2011 04 17 17 29 55 31.3200 -97.3300 251.000 457.0 183.044 3.880 -999.990 -999.990 1.830 ..P WKT 2011 04 17 17 39 55 31.3200 -97.3300 251.000 30.0 183.664 3.740 -999.990 -999.990 1.837 ..P WKT 2011 04 17 17 44 55 31.3200 -97.3300 251.000 122.0 187.343 3.750 -999.990 -999.990 1.873 ..P WKT 2011 04 17 17 49 55 31.3200 -97.3300 251.000 457.0 181.177 4.300 -999.990 -999.990 1.812 ..P WKT 2011 04 17 17 54 55 31.3200 -97.3300 251.000 30.0 181.853 3.480 -999.990 -999.990 1.819 ..P WKT 2011 04 17 17 59 55 31.3200 -97.3300 251.000 122.0 184.197 4.050 -999.990 -999.990 1.842 ..P WKT 2011 04 17 18 04 55 31.3200 -97.3300 251.000 457.0 182.870 3.870 -999.990 -999.990 1.829 ..P WKT 2011 04 17 18 14 55 31.3200 -97.3300 251.000 30.0 182.743 4.170 -999.990 -999.990 1.827 ..P WKT 2011 04 17 18 19 55 31.3200 -97.3300 251.000 122.0 181.772 4.850 -999.990 -999.990 1.818 ..P WKT 2011 04 17 18 24 55 31.3200 -97.3300 251.000 457.0 187.314 3.860 -999.990 -999.990 1.873 ..P WKT 2011 04 17 18 29 55 31.3200 -97.3300 251.000 30.0 182.002 4.110 -999.990 -999.990 1.820 ..P WKT 2011 04 17 18 34 55 31.3200 -97.3300 251.000 122.0 176.354 3.750 -999.990 -999.990 1.764 ..P WKT 2011 04 17 18 39 55 31.3200 -97.3300 251.000 457.0 182.734 4.050 -999.990 -999.990 1.827 ..P WKT 2011 04 17 18 49 55 31.3200 -97.3300 251.000 30.0 174.059 3.690 -999.990 -999.990 1.741 ..P WKT 2011 04 17 18 54 55 31.3200 -97.3300 251.000 122.0 177.887 4.280 -999.990 -999.990 1.779 ..P WKT 2011 04 17 18 59 55 31.3200 -97.3300 251.000 457.0 174.694 5.020 -999.990 -999.990 1.747 ..P WKT 2011 04 17 19 04 55 31.3200 -97.3300 251.000 30.0 176.182 4.450 -999.990 -999.990 1.762 ..P WKT 2011 04 17 19 09 55 31.3200 -97.3300 251.000 122.0 179.342 4.770 -999.990 -999.990 1.793 ..P WKT 2011 04 17 19 14 55 31.3200 -97.3300 251.000 457.0 173.807 4.520 -999.990 -999.990 1.738 ..P WKT 2011 04 17 19 24 55 31.3200 -97.3300 251.000 30.0 174.347 4.100 -999.990 -999.990 1.743 ..P WKT 2011 04 17 19 29 55 31.3200 -97.3300 251.000 122.0 177.746 4.380 -999.990 -999.990 1.777 ..P WKT 2011 04 17 19 34 55 31.3200 -97.3300 251.000 457.0 175.794 4.990 -999.990 -999.990 1.758 ..P WKT 2011 04 17 19 39 55 31.3200 -97.3300 251.000 30.0 176.183 5.270 -999.990 -999.990 1.762 ..P WKT 2011 04 17 19 44 55 31.3200 -97.3300 251.000 122.0 175.233 4.760 -999.990 -999.990 1.752 ..P WKT 2011 04 17 19 49 55 31.3200 -97.3300 251.000 457.0 177.966 4.190 -999.990 -999.990 1.780 ..P WKT 2011 04 17 19 59 55 31.3200 -97.3300 251.000 30.0 174.107 4.480 -999.990 -999.990 1.741 ..P WKT 2011 04 17 20 04 55 31.3200 -97.3300 251.000 122.0 178.227 5.310 -999.990 -999.990 1.782 ..P WKT 2011 04 17 20 09 55 31.3200 -97.3300 251.000 457.0 183.353 4.420 -999.990 -999.990 1.834 ..P WKT 2011 04 17 20 14 55 31.3200 -97.3300 251.000 30.0 176.424 4.800 -999.990 -999.990 1.764 ..P WKT 2011 04 17 20 19 55 31.3200 -97.3300 251.000 122.0 180.881 4.640 -999.990 -999.990 1.809 ..P WKT 2011 04 17 20 24 55 31.3200 -97.3300 251.000 457.0 174.619 5.020 -999.990 -999.990 1.746 ..P WKT 2011 04 17 20 34 55 31.3200 -97.3300 251.000 30.0 176.045 4.610 -999.990 -999.990 1.760 ..P WKT 2011 04 17 20 39 55 31.3200 -97.3300 251.000 122.0 176.363 4.350 -999.990 -999.990 1.764 ..P WKT 2011 04 17 20 44 55 31.3200 -97.3300 251.000 457.0 174.670 5.650 -999.990 -999.990 1.747 ..P WKT 2011 04 17 20 49 55 31.3200 -97.3300 251.000 30.0 170.127 5.270 -999.990 -999.990 1.701 ..P WKT 2011 04 17 20 54 55 31.3200 -97.3300 251.000 122.0 179.330 5.830 -999.990 -999.990 1.793 ..P WKT 2011 04 17 20 59 55 31.3200 -97.3300 251.000 457.0 176.966 4.380 -999.990 -999.990 1.770 ..P WKT 2011 04 17 21 09 55 31.3200 -97.3300 251.000 30.0 179.136 3.920 -999.990 -999.990 1.791 ..P WKT 2011 04 17 21 14 55 31.3200 -97.3300 251.000 122.0 187.865 4.780 -999.990 -999.990 1.879 ..P WKT 2011 04 17 21 19 55 31.3200 -97.3300 251.000 457.0 186.029 5.610 -999.990 -999.990 1.860 ..P WKT 2011 04 17 21 24 55 31.3200 -97.3300 251.000 30.0 184.024 6.640 -999.990 -999.990 1.840 ..P WKT 2011 04 17 21 29 55 31.3200 -97.3300 251.000 122.0 188.226 5.690 -999.990 -999.990 1.882 ..P WKT 2011 04 17 21 34 55 31.3200 -97.3300 251.000 457.0 184.040 4.860 -999.990 -999.990 1.840 ..P WKT 2011 04 17 21 44 55 31.3200 -97.3300 251.000 30.0 186.142 4.790 -999.990 -999.990 1.861 ..P WKT 2011 04 17 21 49 55 31.3200 -97.3300 251.000 122.0 180.346 6.260 -999.990 -999.990 1.803 ..P WKT 2011 04 17 21 54 55 31.3200 -97.3300 251.000 457.0 178.411 6.280 -999.990 -999.990 1.784 ..P WKT 2011 04 17 21 59 55 31.3200 -97.3300 251.000 30.0 180.505 7.260 -999.990 -999.990 1.805 ..P WKT 2011 04 17 22 04 55 31.3200 -97.3300 251.000 122.0 180.585 6.220 -999.990 -999.990 1.806 ..P WKT 2011 04 17 22 09 55 31.3200 -97.3300 251.000 457.0 178.482 4.700 -999.990 -999.990 1.785 ..P WKT 2011 04 17 22 19 55 31.3200 -97.3300 251.000 30.0 184.880 5.030 -999.990 -999.990 1.849 ..P WKT 2011 04 17 22 24 55 31.3200 -97.3300 251.000 122.0 180.615 6.730 -999.990 -999.990 1.806 ..P WKT 2011 04 17 22 29 55 31.3200 -97.3300 251.000 457.0 174.334 6.980 -999.990 -999.990 1.743 ..P WKT 2011 04 17 22 34 55 31.3200 -97.3300 251.000 30.0 175.109 5.810 -999.990 -999.990 1.751 ..P WKT 2011 04 17 22 39 55 31.3200 -97.3300 251.000 122.0 184.120 5.500 -999.990 -999.990 1.841 ..P WKT 2011 04 17 22 44 55 31.3200 -97.3300 251.000 457.0 180.526 5.210 -999.990 -999.990 1.805 ..P WKT 2011 04 17 22 54 55 31.3200 -97.3300 251.000 30.0 174.247 4.680 -999.990 -999.990 1.742 ..P WKT 2011 04 17 22 59 55 31.3200 -97.3300 251.000 122.0 182.999 5.350 -999.990 -999.990 1.830 ..P WKT 2011 04 17 23 04 55 31.3200 -97.3300 251.000 457.0 180.988 6.060 -999.990 -999.990 1.810 ..P WKT 2011 04 17 23 09 55 31.3200 -97.3300 251.000 30.0 179.313 5.220 -999.990 -999.990 1.793 ..P WKT 2011 04 17 23 14 55 31.3200 -97.3300 251.000 122.0 189.079 4.940 -999.990 -999.990 1.891 ..P WKT 2011 04 17 23 19 55 31.3200 -97.3300 251.000 457.0 181.011 4.130 -999.990 -999.990 1.810 ..P WKT 2011 04 17 23 29 55 31.3200 -97.3300 251.000 30.0 176.524 4.320 -999.990 -999.990 1.765 ..P WKT 2011 04 17 23 34 55 31.3200 -97.3300 251.000 122.0 185.158 5.060 -999.990 -999.990 1.852 ..P WKT 2011 04 17 23 39 55 31.3200 -97.3300 251.000 457.0 173.929 4.600 -999.990 -999.990 1.739 ..P WKT 2011 04 17 23 44 55 31.3200 -97.3300 251.000 30.0 174.146 4.760 -999.990 -999.990 1.741 ..P WKT 2011 04 17 23 49 55 31.3200 -97.3300 251.000 122.0 175.711 5.220 -999.990 -999.990 1.757 ..P WKT 2011 04 18 00 09 55 31.3200 -97.3300 251.000 457.0 182.787 5.590 -999.990 -999.990 1.828 ..P WKT 2011 04 18 00 10 25 31.3200 -97.3300 251.000 457.0 180.197 5.420 -999.990 -999.990 1.802 ..P WKT 2011 04 18 00 10 55 31.3200 -97.3300 251.000 457.0 179.290 5.660 -999.990 -999.990 1.793 ..P WKT 2011 04 18 00 11 25 31.3200 -97.3300 251.000 457.0 177.037 6.150 -999.990 -999.990 1.770 ..P WKT 2011 04 18 00 11 55 31.3200 -97.3300 251.000 457.0 182.192 5.580 -999.990 -999.990 1.822 ..P WKT 2011 04 18 00 12 25 31.3200 -97.3300 251.000 457.0 175.898 5.520 -999.990 -999.990 1.759 ..P WKT 2011 04 18 00 12 55 31.3200 -97.3300 251.000 457.0 177.013 5.520 -999.990 -999.990 1.770 ..P WKT 2011 04 18 00 13 25 31.3200 -97.3300 251.000 457.0 174.759 5.390 -999.990 -999.990 1.748 ..P WKT 2011 04 18 00 13 55 31.3200 -97.3300 251.000 457.0 173.516 5.420 -999.990 -999.990 1.735 ..P WKT 2011 04 18 00 14 25 31.3200 -97.3300 251.000 457.0 179.681 5.920 -999.990 -999.990 1.797 ..P WKT 2011 04 18 00 14 55 31.3200 -97.3300 251.000 457.0 183.826 5.580 -999.990 -999.990 1.838 ..P WKT 2011 04 18 00 19 55 31.3200 -97.3300 251.000 30.0 174.764 5.890 -999.990 -999.990 1.748 ..P WKT 2011 04 18 00 24 55 31.3200 -97.3300 251.000 122.0 183.883 5.420 -999.990 -999.990 1.839 ..P WKT 2011 04 18 00 29 55 31.3200 -97.3300 251.000 457.0 180.882 5.760 -999.990 -999.990 1.809 ..P WKT 2011 04 18 00 34 55 31.3200 -97.3300 251.000 30.0 180.574 5.580 -999.990 -999.990 1.806 ..P WKT 2011 04 18 00 39 55 31.3200 -97.3300 251.000 122.0 175.891 5.470 -999.990 -999.990 1.759 ..P WKT 2011 04 18 00 44 55 31.3200 -97.3300 251.000 457.0 171.545 5.460 -999.990 -999.990 1.715 ..P WKT 2011 04 18 00 54 55 31.3200 -97.3300 251.000 30.0 173.200 5.420 -999.990 -999.990 1.732 ..P WKT 2011 04 18 00 59 55 31.3200 -97.3300 251.000 122.0 179.200 4.830 -999.990 -999.990 1.792 ..P WKT 2011 04 18 01 04 55 31.3200 -97.3300 251.000 457.0 172.079 5.290 -999.990 -999.990 1.721 ..P WKT 2011 04 18 01 09 55 31.3200 -97.3300 251.000 30.0 177.406 4.910 -999.990 -999.990 1.774 ..P WKT 2011 04 18 01 14 55 31.3200 -97.3300 251.000 122.0 178.694 4.370 -999.990 -999.990 1.787 ..P WKT 2011 04 18 01 19 55 31.3200 -97.3300 251.000 457.0 175.611 4.780 -999.990 -999.990 1.756 ..P WKT 2011 04 18 01 29 55 31.3200 -97.3300 251.000 30.0 174.802 4.330 -999.990 -999.990 1.748 ..P WKT 2011 04 18 01 34 55 31.3200 -97.3300 251.000 122.0 167.997 4.870 -999.990 -999.990 1.680 ..P WKT 2011 04 18 01 39 55 31.3200 -97.3300 251.000 457.0 167.246 4.360 -999.990 -999.990 1.672 ..P WKT 2011 04 18 01 44 55 31.3200 -97.3300 251.000 30.0 160.779 4.480 -999.990 -999.990 1.608 ..P WKT 2011 04 18 01 49 55 31.3200 -97.3300 251.000 122.0 169.944 4.400 -999.990 -999.990 1.699 ..P WKT 2011 04 18 01 54 55 31.3200 -97.3300 251.000 457.0 169.192 4.290 -999.990 -999.990 1.692 ..P WKT 2011 04 18 02 04 55 31.3200 -97.3300 251.000 30.0 167.473 4.700 -999.990 -999.990 1.675 ..P WKT 2011 04 18 02 09 55 31.3200 -97.3300 251.000 122.0 174.904 4.190 -999.990 -999.990 1.749 ..P WKT 2011 04 18 02 14 55 31.3200 -97.3300 251.000 457.0 178.640 4.350 -999.990 -999.990 1.786 ..P WKT 2011 04 18 02 19 55 31.3200 -97.3300 251.000 30.0 168.602 4.070 -999.990 -999.990 1.686 ..P WKT 2011 04 18 02 24 55 31.3200 -97.3300 251.000 122.0 176.031 4.370 -999.990 -999.990 1.760 ..P WKT 2011 04 18 02 29 55 31.3200 -97.3300 251.000 457.0 170.698 4.380 -999.990 -999.990 1.707 ..P WKT 2011 04 18 02 39 55 31.3200 -97.3300 251.000 30.0 166.485 4.500 -999.990 -999.990 1.665 ..P WKT 2011 04 18 02 44 55 31.3200 -97.3300 251.000 122.0 170.123 4.140 -999.990 -999.990 1.701 ..P WKT 2011 04 18 02 49 55 31.3200 -97.3300 251.000 457.0 164.528 4.360 -999.990 -999.990 1.645 ..P WKT 2011 04 18 02 54 55 31.3200 -97.3300 251.000 30.0 164.641 4.360 -999.990 -999.990 1.646 ..P WKT 2011 04 18 02 59 55 31.3200 -97.3300 251.000 122.0 168.782 4.580 -999.990 -999.990 1.688 ..P WKT 2011 04 18 03 04 55 31.3200 -97.3300 251.000 457.0 163.189 4.810 -999.990 -999.990 1.632 ..P WKT 2011 04 18 03 14 55 31.3200 -97.3300 251.000 30.0 168.711 4.570 -999.990 -999.990 1.687 ..P WKT 2011 04 18 03 19 55 31.3200 -97.3300 251.000 122.0 165.731 4.440 -999.990 -999.990 1.657 ..P WKT 2011 04 18 03 24 55 31.3200 -97.3300 251.000 457.0 165.437 4.610 -999.990 -999.990 1.654 ..P WKT 2011 04 18 03 29 55 31.3200 -97.3300 251.000 30.0 158.097 4.390 -999.990 -999.990 1.581 ..P WKT 2011 04 18 03 34 55 31.3200 -97.3300 251.000 122.0 163.506 4.360 -999.990 -999.990 1.635 ..P WKT 2011 04 18 03 39 55 31.3200 -97.3300 251.000 457.0 161.199 4.410 -999.990 -999.990 1.612 ..P WKT 2011 04 18 03 49 55 31.3200 -97.3300 251.000 30.0 161.761 4.080 -999.990 -999.990 1.618 ..P WKT 2011 04 18 03 54 55 31.3200 -97.3300 251.000 122.0 161.609 4.860 -999.990 -999.990 1.616 ..P WKT 2011 04 18 03 59 55 31.3200 -97.3300 251.000 457.0 152.742 4.770 -999.990 -999.990 1.527 ..P WKT 2011 04 18 04 04 55 31.3200 -97.3300 251.000 30.0 157.621 5.000 -999.990 -999.990 1.576 ..P WKT 2011 04 18 04 09 55 31.3200 -97.3300 251.000 122.0 160.152 5.410 -999.990 -999.990 1.602 ..P WKT 2011 04 18 04 14 55 31.3200 -97.3300 251.000 457.0 158.326 3.720 -999.990 -999.990 1.583 ..P WKT 2011 04 18 04 24 55 31.3200 -97.3300 251.000 30.0 157.045 3.760 -999.990 -999.990 1.570 ..P WKT 2011 04 18 04 29 55 31.3200 -97.3300 251.000 122.0 158.594 4.270 -999.990 -999.990 1.586 ..P WKT 2011 04 18 04 34 55 31.3200 -97.3300 251.000 457.0 156.122 4.700 -999.990 -999.990 1.561 ..P WKT 2011 04 18 04 39 55 31.3200 -97.3300 251.000 30.0 154.657 4.690 -999.990 -999.990 1.547 ..P WKT 2011 04 18 04 44 55 31.3200 -97.3300 251.000 122.0 155.201 3.930 -999.990 -999.990 1.552 ..P WKT 2011 04 18 04 49 55 31.3200 -97.3300 251.000 457.0 159.095 4.490 -999.990 -999.990 1.591 ..P WKT 2011 04 18 05 04 55 31.3200 -97.3300 251.000 30.0 155.900 3.690 -999.990 -999.990 1.559 ..P WKT 2011 04 18 05 09 55 31.3200 -97.3300 251.000 122.0 159.137 4.080 -999.990 -999.990 1.591 ..P WKT 2011 04 18 05 14 55 31.3200 -97.3300 251.000 457.0 159.863 4.020 -999.990 -999.990 1.599 ..P WKT 2011 04 18 05 19 55 31.3200 -97.3300 251.000 30.0 158.412 3.810 -999.990 -999.990 1.584 ..P WKT 2011 04 18 05 24 55 31.3200 -97.3300 251.000 122.0 158.803 4.240 -999.990 -999.990 1.588 ..P WKT 2011 04 18 05 29 55 31.3200 -97.3300 251.000 457.0 154.843 4.100 -999.990 -999.990 1.548 ..P WKT 2011 04 18 05 39 55 31.3200 -97.3300 251.000 30.0 154.607 5.260 -999.990 -999.990 1.546 ..P WKT 2011 04 18 05 44 55 31.3200 -97.3300 251.000 122.0 151.470 3.860 -999.990 -999.990 1.515 ..P WKT 2011 04 18 05 49 55 31.3200 -97.3300 251.000 457.0 158.370 4.280 -999.990 -999.990 1.584 ..P WKT 2011 04 18 05 54 55 31.3200 -97.3300 251.000 30.0 153.394 5.520 -999.990 -999.990 1.534 ..P WKT 2011 04 18 05 59 55 31.3200 -97.3300 251.000 122.0 146.747 4.520 -999.990 -999.990 1.467 ..P WKT 2011 04 18 06 04 55 31.3200 -97.3300 251.000 457.0 152.307 3.960 -999.990 -999.990 1.523 ..P WKT 2011 04 18 06 14 55 31.3200 -97.3300 251.000 30.0 156.451 3.790 -999.990 -999.990 1.565 ..P WKT 2011 04 18 06 19 55 31.3200 -97.3300 251.000 122.0 157.543 4.170 -999.990 -999.990 1.575 ..P WKT 2011 04 18 06 24 55 31.3200 -97.3300 251.000 457.0 156.629 4.530 -999.990 -999.990 1.566 ..P WKT 2011 04 18 06 29 55 31.3200 -97.3300 251.000 30.0 157.220 4.580 -999.990 -999.990 1.572 ..P WKT 2011 04 18 06 34 55 31.3200 -97.3300 251.000 122.0 158.144 4.240 -999.990 -999.990 1.581 ..P WKT 2011 04 18 06 39 55 31.3200 -97.3300 251.000 457.0 155.058 3.750 -999.990 -999.990 1.551 ..P WKT 2011 04 18 06 49 55 31.3200 -97.3300 251.000 30.0 160.655 4.060 -999.990 -999.990 1.607 ..P WKT 2011 04 18 06 54 55 31.3200 -97.3300 251.000 122.0 158.978 4.190 -999.990 -999.990 1.590 ..P WKT 2011 04 18 06 59 55 31.3200 -97.3300 251.000 457.0 165.653 3.910 -999.990 -999.990 1.657 ..P WKT 2011 04 18 07 04 55 31.3200 -97.3300 251.000 30.0 155.624 3.860 -999.990 -999.990 1.556 ..P WKT 2011 04 18 07 09 55 31.3200 -97.3300 251.000 122.0 161.296 4.160 -999.990 -999.990 1.613 ..P WKT 2011 04 18 07 14 55 31.3200 -97.3300 251.000 457.0 161.957 4.270 -999.990 -999.990 1.620 ..P WKT 2011 04 18 07 24 55 31.3200 -97.3300 251.000 30.0 157.508 4.460 -999.990 -999.990 1.575 ..P WKT 2011 04 18 07 29 55 31.3200 -97.3300 251.000 122.0 159.743 4.470 -999.990 -999.990 1.597 ..P WKT 2011 04 18 07 34 55 31.3200 -97.3300 251.000 457.0 154.967 4.370 -999.990 -999.990 1.550 ..P WKT 2011 04 18 07 39 55 31.3200 -97.3300 251.000 30.0 158.871 4.680 -999.990 -999.990 1.589 ..P WKT 2011 04 18 07 44 55 31.3200 -97.3300 251.000 122.0 160.772 4.210 -999.990 -999.990 1.608 ..P WKT 2011 04 18 07 49 55 31.3200 -97.3300 251.000 457.0 155.998 4.500 -999.990 -999.990 1.560 ..P WKT 2011 04 18 07 59 55 31.3200 -97.3300 251.000 30.0 163.493 4.410 -999.990 -999.990 1.635 ..P WKT 2011 04 18 08 04 55 31.3200 -97.3300 251.000 122.0 159.411 4.230 -999.990 -999.990 1.594 ..P WKT 2011 04 18 08 09 55 31.3200 -97.3300 251.000 457.0 167.339 3.640 -999.990 -999.990 1.673 ..P WKT 2011 04 18 08 14 55 31.3200 -97.3300 251.000 30.0 160.588 3.690 -999.990 -999.990 1.606 ..P WKT 2011 04 18 08 19 55 31.3200 -97.3300 251.000 122.0 168.516 3.500 -999.990 -999.990 1.685 ..P WKT 2011 04 18 08 24 55 31.3200 -97.3300 251.000 457.0 167.102 3.890 -999.990 -999.990 1.671 ..P WKT 2011 04 18 08 34 55 31.3200 -97.3300 251.000 30.0 171.137 3.670 -999.990 -999.990 1.711 ..P WKT 2011 04 18 08 39 55 31.3200 -97.3300 251.000 122.0 167.414 4.220 -999.990 -999.990 1.674 ..P WKT 2011 04 18 08 44 55 31.3200 -97.3300 251.000 457.0 170.692 4.150 -999.990 -999.990 1.707 ..P WKT 2011 04 18 08 49 55 31.3200 -97.3300 251.000 30.0 159.470 4.930 -999.990 -999.990 1.595 ..P WKT 2011 04 18 08 54 55 31.3200 -97.3300 251.000 122.0 170.582 4.610 -999.990 -999.990 1.706 ..P WKT 2011 04 18 08 59 55 31.3200 -97.3300 251.000 457.0 164.361 5.070 -999.990 -999.990 1.644 ..P WKT 2011 04 18 09 09 55 31.3200 -97.3300 251.000 30.0 167.941 5.590 -999.990 -999.990 1.679 ..P WKT 2011 04 18 09 14 55 31.3200 -97.3300 251.000 122.0 168.576 5.060 -999.990 -999.990 1.686 ..P WKT 2011 04 18 09 19 55 31.3200 -97.3300 251.000 457.0 177.706 6.200 -999.990 -999.990 1.777 ..P WKT 2011 04 18 09 24 55 31.3200 -97.3300 251.000 30.0 168.014 7.210 -999.990 -999.990 1.680 ..P WKT 2011 04 18 09 29 55 31.3200 -97.3300 251.000 122.0 172.313 6.410 -999.990 -999.990 1.723 ..P WKT 2011 04 18 09 34 55 31.3200 -97.3300 251.000 457.0 172.614 4.630 -999.990 -999.990 1.726 ..P WKT 2011 04 18 09 44 55 31.3200 -97.3300 251.000 30.0 168.721 4.820 -999.990 -999.990 1.687 ..P WKT 2011 04 18 09 49 55 31.3200 -97.3300 251.000 122.0 169.357 6.130 -999.990 -999.990 1.694 ..P WKT 2011 04 18 09 54 55 31.3200 -97.3300 251.000 457.0 174.318 6.980 -999.990 -999.990 1.743 ..P WKT 2011 04 18 09 59 55 31.3200 -97.3300 251.000 30.0 168.627 5.780 -999.990 -999.990 1.686 ..P WKT 2011 04 18 10 04 55 31.3200 -97.3300 251.000 122.0 167.930 5.670 -999.990 -999.990 1.679 ..P WKT 2011 04 18 10 09 55 31.3200 -97.3300 251.000 457.0 168.731 4.880 -999.990 -999.990 1.687 ..P WKT 2011 04 18 10 19 55 31.3200 -97.3300 251.000 30.0 167.100 5.560 -999.990 -999.990 1.671 ..P WKT 2011 04 18 10 24 55 31.3200 -97.3300 251.000 122.0 161.174 4.950 -999.990 -999.990 1.612 ..P WKT 2011 04 18 10 29 55 31.3200 -97.3300 251.000 457.0 174.048 5.750 -999.990 -999.990 1.740 ..P WKT 2011 04 18 10 34 55 31.3200 -97.3300 251.000 30.0 159.973 4.770 -999.990 -999.990 1.600 ..P WKT 2011 04 18 10 39 55 31.3200 -97.3300 251.000 122.0 166.524 5.010 -999.990 -999.990 1.665 ..P WKT 2011 04 18 10 44 55 31.3200 -97.3300 251.000 457.0 165.091 4.700 -999.990 -999.990 1.651 ..P WKT 2011 04 18 10 54 55 31.3200 -97.3300 251.000 30.0 159.851 4.430 -999.990 -999.990 1.599 ..P WKT 2011 04 18 10 59 55 31.3200 -97.3300 251.000 122.0 166.685 4.440 -999.990 -999.990 1.667 ..P WKT 2011 04 18 11 04 55 31.3200 -97.3300 251.000 457.0 170.525 4.460 -999.990 -999.990 1.705 ..P WKT 2011 04 18 11 09 55 31.3200 -97.3300 251.000 30.0 162.396 3.970 -999.990 -999.990 1.624 ..P WKT 2011 04 18 11 14 55 31.3200 -97.3300 251.000 122.0 161.582 3.820 -999.990 -999.990 1.616 ..P WKT 2011 04 18 11 19 55 31.3200 -97.3300 251.000 457.0 163.759 3.470 -999.990 -999.990 1.638 ..P WKT 2011 04 18 11 29 55 31.3200 -97.3300 251.000 30.0 161.069 3.450 -999.990 -999.990 1.611 ..P WKT 2011 04 18 11 34 55 31.3200 -97.3300 251.000 122.0 167.833 4.670 -999.990 -999.990 1.678 ..P WKT 2011 04 18 11 39 55 31.3200 -97.3300 251.000 457.0 170.275 3.770 -999.990 -999.990 1.703 ..P WKT 2011 04 18 11 44 55 31.3200 -97.3300 251.000 30.0 160.759 4.350 -999.990 -999.990 1.608 ..P WKT 2011 04 18 11 49 55 31.3200 -97.3300 251.000 122.0 168.184 4.880 -999.990 -999.990 1.682 ..P WKT 2011 04 18 12 09 55 31.3200 -97.3300 251.000 457.0 178.850 4.100 -999.990 -999.990 1.788 ..P WKT 2011 04 18 12 10 25 31.3200 -97.3300 251.000 457.0 178.822 3.840 -999.990 -999.990 1.788 ..P WKT 2011 04 18 12 10 55 31.3200 -97.3300 251.000 457.0 179.790 3.760 -999.990 -999.990 1.798 ..P WKT 2011 04 18 12 11 25 31.3200 -97.3300 251.000 457.0 180.759 3.490 -999.990 -999.990 1.808 ..P WKT 2011 04 18 12 11 55 31.3200 -97.3300 251.000 457.0 181.394 4.180 -999.990 -999.990 1.814 ..P WKT 2011 04 18 12 12 25 31.3200 -97.3300 251.000 457.0 177.049 3.710 -999.990 -999.990 1.770 ..P WKT 2011 04 18 12 12 55 31.3200 -97.3300 251.000 457.0 177.353 3.910 -999.990 -999.990 1.774 ..P WKT 2011 04 18 12 13 25 31.3200 -97.3300 251.000 457.0 183.635 4.430 -999.990 -999.990 1.836 ..P WKT 2011 04 18 12 13 55 31.3200 -97.3300 251.000 457.0 185.931 3.540 -999.990 -999.990 1.859 ..P WKT 2011 04 18 12 14 25 31.3200 -97.3300 251.000 457.0 185.238 3.610 -999.990 -999.990 1.852 ..P WKT 2011 04 18 12 14 55 31.3200 -97.3300 251.000 457.0 177.905 3.760 -999.990 -999.990 1.779 ..P WKT 2011 04 18 12 19 55 31.3200 -97.3300 251.000 30.0 169.986 4.500 -999.990 -999.990 1.700 ..P WKT 2011 04 18 12 24 55 31.3200 -97.3300 251.000 122.0 167.382 4.730 -999.990 -999.990 1.674 ..P WKT 2011 04 18 12 29 55 31.3200 -97.3300 251.000 457.0 170.754 4.080 -999.990 -999.990 1.708 ..P WKT 2011 04 18 12 34 55 31.3200 -97.3300 251.000 30.0 165.991 3.550 -999.990 -999.990 1.660 ..P WKT 2011 04 18 12 39 55 31.3200 -97.3300 251.000 122.0 165.213 3.530 -999.990 -999.990 1.652 ..P WKT 2011 04 18 12 44 55 31.3200 -97.3300 251.000 457.0 169.248 3.590 -999.990 -999.990 1.692 ..P WKT 2011 04 18 12 54 55 31.3200 -97.3300 251.000 30.0 159.058 3.490 -999.990 -999.990 1.591 ..P WKT 2011 04 18 12 59 55 31.3200 -97.3300 251.000 122.0 163.754 3.380 -999.990 -999.990 1.638 ..P WKT 2011 04 18 13 04 55 31.3200 -97.3300 251.000 457.0 182.391 3.890 -999.990 -999.990 1.824 ..P WKT 2011 04 18 13 09 55 31.3200 -97.3300 251.000 30.0 160.202 4.620 -999.990 -999.990 1.602 ..P WKT 2011 04 18 13 14 55 31.3200 -97.3300 251.000 122.0 158.094 3.660 -999.990 -999.990 1.581 ..P WKT 2011 04 18 13 19 55 31.3200 -97.3300 251.000 457.0 177.557 3.460 -999.990 -999.990 1.776 ..P WKT 2011 04 18 13 29 55 31.3200 -97.3300 251.000 30.0 158.953 3.550 -999.990 -999.990 1.590 ..P WKT 2011 04 18 13 34 55 31.3200 -97.3300 251.000 122.0 160.045 3.690 -999.990 -999.990 1.600 ..P WKT 2011 04 18 13 39 55 31.3200 -97.3300 251.000 457.0 172.584 4.420 -999.990 -999.990 1.726 ..P WKT 2011 04 18 13 44 55 31.3200 -97.3300 251.000 30.0 157.418 3.650 -999.990 -999.990 1.574 ..P WKT 2011 04 18 13 49 55 31.3200 -97.3300 251.000 122.0 165.311 5.100 -999.990 -999.990 1.653 ..P WKT 2011 04 18 13 54 55 31.3200 -97.3300 251.000 457.0 177.683 4.320 -999.990 -999.990 1.777 ..P WKT 2011 04 18 14 04 55 31.3200 -97.3300 251.000 30.0 164.440 4.450 -999.990 -999.990 1.644 ..P WKT 2011 04 18 14 09 55 31.3200 -97.3300 251.000 122.0 169.678 4.190 -999.990 -999.990 1.697 ..P WKT 2011 04 18 14 14 55 31.3200 -97.3300 251.000 457.0 172.594 4.140 -999.990 -999.990 1.726 ..P WKT 2011 04 18 14 19 55 31.3200 -97.3300 251.000 30.0 167.714 4.630 -999.990 -999.990 1.677 ..P WKT 2011 04 18 14 24 55 31.3200 -97.3300 251.000 122.0 169.966 5.570 -999.990 -999.990 1.700 ..P WKT 2011 04 18 14 29 55 31.3200 -97.3300 251.000 457.0 178.188 4.260 -999.990 -999.990 1.782 ..P WKT 2011 04 18 14 39 55 31.3200 -97.3300 251.000 30.0 168.004 4.680 -999.990 -999.990 1.680 ..P WKT 2011 04 18 14 44 55 31.3200 -97.3300 251.000 122.0 174.140 4.340 -999.990 -999.990 1.741 ..P WKT 2011 04 18 14 49 55 31.3200 -97.3300 251.000 457.0 180.607 4.220 -999.990 -999.990 1.806 ..P WKT 2011 04 18 14 54 55 31.3200 -97.3300 251.000 30.0 171.822 4.500 -999.990 -999.990 1.718 ..P WKT 2011 04 18 14 59 55 31.3200 -97.3300 251.000 122.0 178.288 4.210 -999.990 -999.990 1.783 ..P WKT 2011 04 18 15 04 55 31.3200 -97.3300 251.000 457.0 191.716 3.990 -999.990 -999.990 1.917 ..P WKT 2011 04 18 15 14 55 31.3200 -97.3300 251.000 30.0 181.298 3.960 -999.990 -999.990 1.813 ..P WKT 2011 04 18 15 19 55 31.3200 -97.3300 251.000 122.0 183.975 3.730 -999.990 -999.990 1.840 ..P WKT 2011 04 18 15 24 55 31.3200 -97.3300 251.000 457.0 194.937 3.890 -999.990 -999.990 1.949 ..P WKT 2011 04 18 15 29 55 31.3200 -97.3300 251.000 30.0 175.405 4.390 -999.990 -999.990 1.754 ..P WKT 2011 04 18 15 34 55 31.3200 -97.3300 251.000 122.0 183.054 4.520 -999.990 -999.990 1.831 ..P WKT 2011 04 18 15 39 55 31.3200 -97.3300 251.000 457.0 185.398 3.690 -999.990 -999.990 1.854 ..P WKT 2011 04 18 15 49 55 31.3200 -97.3300 251.000 30.0 191.033 3.750 -999.990 -999.990 1.910 ..P WKT 2011 04 18 15 54 55 31.3200 -97.3300 251.000 122.0 184.050 3.470 -999.990 -999.990 1.841 ..P WKT 2011 04 18 15 59 55 31.3200 -97.3300 251.000 457.0 188.335 3.680 -999.990 -999.990 1.883 ..P WKT 2011 04 18 16 04 55 31.3200 -97.3300 251.000 30.0 183.010 3.830 -999.990 -999.990 1.830 ..P WKT 2011 04 18 16 09 55 31.3200 -97.3300 251.000 122.0 186.963 3.600 -999.990 -999.990 1.870 ..P WKT 2011 04 18 16 14 55 31.3200 -97.3300 251.000 457.0 191.579 3.920 -999.990 -999.990 1.916 ..P WKT 2011 04 18 16 24 55 31.3200 -97.3300 251.000 30.0 185.521 4.140 -999.990 -999.990 1.855 ..P WKT 2011 04 18 16 29 55 31.3200 -97.3300 251.000 122.0 191.580 3.690 -999.990 -999.990 1.916 ..P WKT 2011 04 18 16 34 55 31.3200 -97.3300 251.000 457.0 187.534 4.130 -999.990 -999.990 1.875 ..P WKT 2011 04 18 16 39 55 31.3200 -97.3300 251.000 30.0 188.954 4.230 -999.990 -999.990 1.890 ..P WKT 2011 04 18 16 44 55 31.3200 -97.3300 251.000 122.0 188.221 4.040 -999.990 -999.990 1.882 ..P WKT 2011 04 18 16 49 55 31.3200 -97.3300 251.000 457.0 191.132 4.650 -999.990 -999.990 1.911 ..P WKT 2011 04 18 17 04 55 31.3200 -97.3300 251.000 30.0 188.862 6.200 -999.990 -999.990 1.889 ..P WKT 2011 04 18 17 09 55 31.3200 -97.3300 251.000 122.0 198.441 4.250 -999.990 -999.990 1.984 ..P WKT 2011 04 18 17 14 55 31.3200 -97.3300 251.000 457.0 193.616 4.350 -999.990 -999.990 1.936 ..P WKT 2011 04 18 17 19 55 31.3200 -97.3300 251.000 30.0 193.262 4.620 -999.990 -999.990 1.933 ..P WKT 2011 04 18 17 24 55 31.3200 -97.3300 251.000 122.0 194.397 4.970 -999.990 -999.990 1.944 ..P WKT 2011 04 18 17 29 55 31.3200 -97.3300 251.000 457.0 190.235 4.660 -999.990 -999.990 1.902 ..P WKT 2011 04 18 17 39 55 31.3200 -97.3300 251.000 30.0 191.087 4.690 -999.990 -999.990 1.911 ..P WKT 2011 04 18 17 44 55 31.3200 -97.3300 251.000 122.0 194.279 4.800 -999.990 -999.990 1.943 ..P WKT 2011 04 18 17 49 55 31.3200 -97.3300 251.000 457.0 190.851 5.090 -999.990 -999.990 1.909 ..P WKT 2011 04 18 17 54 55 31.3200 -97.3300 251.000 30.0 188.416 5.020 -999.990 -999.990 1.884 ..P WKT 2011 04 18 17 59 55 31.3200 -97.3300 251.000 122.0 195.580 4.820 -999.990 -999.990 1.956 ..P WKT 2011 04 18 18 04 55 31.3200 -97.3300 251.000 457.0 197.612 4.470 -999.990 -999.990 1.976 ..P WKT 2011 04 18 18 14 55 31.3200 -97.3300 251.000 30.0 196.904 4.070 -999.990 -999.990 1.969 ..P WKT 2011 04 18 18 19 55 31.3200 -97.3300 251.000 122.0 199.621 4.310 -999.990 -999.990 1.996 ..P WKT 2011 04 18 18 24 55 31.3200 -97.3300 251.000 457.0 194.895 4.100 -999.990 -999.990 1.949 ..P WKT 2011 04 18 18 29 55 31.3200 -97.3300 251.000 30.0 199.102 4.060 -999.990 -999.990 1.991 ..P WKT 2011 04 18 18 34 55 31.3200 -97.3300 251.000 122.0 191.067 4.220 -999.990 -999.990 1.911 ..P WKT 2011 04 18 18 39 55 31.3200 -97.3300 251.000 457.0 192.627 4.870 -999.990 -999.990 1.926 ..P WKT 2011 04 18 18 49 55 31.3200 -97.3300 251.000 30.0 192.036 4.500 -999.990 -999.990 1.920 ..P WKT 2011 04 18 18 54 55 31.3200 -97.3300 251.000 122.0 191.541 4.150 -999.990 -999.990 1.915 ..P WKT 2011 04 18 18 59 55 31.3200 -97.3300 251.000 457.0 186.745 4.350 -999.990 -999.990 1.867 ..P WKT 2011 04 18 19 04 55 31.3200 -97.3300 251.000 30.0 189.226 4.900 -999.990 -999.990 1.892 ..P WKT 2011 04 18 19 09 55 31.3200 -97.3300 251.000 122.0 190.714 5.010 -999.990 -999.990 1.907 ..P WKT 2011 04 18 19 14 55 31.3200 -97.3300 251.000 457.0 192.533 5.190 -999.990 -999.990 1.925 ..P WKT 2011 04 18 19 24 55 31.3200 -97.3300 251.000 30.0 193.054 5.200 -999.990 -999.990 1.931 ..P WKT 2011 04 18 19 29 55 31.3200 -97.3300 251.000 122.0 200.022 4.680 -999.990 -999.990 2.000 ..P WKT 2011 04 18 19 34 55 31.3200 -97.3300 251.000 457.0 195.747 5.260 -999.990 -999.990 1.957 ..P WKT 2011 04 18 19 39 55 31.3200 -97.3300 251.000 30.0 197.423 4.590 -999.990 -999.990 1.974 ..P WKT 2011 04 18 19 44 55 31.3200 -97.3300 251.000 122.0 196.124 4.610 -999.990 -999.990 1.961 ..P WKT 2011 04 18 19 49 55 31.3200 -97.3300 251.000 457.0 198.462 5.160 -999.990 -999.990 1.985 ..P WKT 2011 04 18 19 59 55 31.3200 -97.3300 251.000 30.0 196.290 4.910 -999.990 -999.990 1.963 ..P WKT 2011 04 18 20 04 55 31.3200 -97.3300 251.000 122.0 198.391 5.270 -999.990 -999.990 1.984 ..P WKT 2011 04 18 20 09 55 31.3200 -97.3300 251.000 457.0 203.798 5.140 -999.990 -999.990 2.038 ..P WKT 2011 04 18 20 14 55 31.3200 -97.3300 251.000 30.0 191.356 5.560 -999.990 -999.990 1.914 ..P WKT 2011 04 18 20 19 55 31.3200 -97.3300 251.000 122.0 206.513 5.180 -999.990 -999.990 2.065 ..P WKT 2011 04 18 20 24 55 31.3200 -97.3300 251.000 457.0 201.012 4.800 -999.990 -999.990 2.010 ..P WKT 2011 04 18 20 34 55 31.3200 -97.3300 251.000 30.0 196.267 5.060 -999.990 -999.990 1.963 ..P WKT 2011 04 18 20 39 55 31.3200 -97.3300 251.000 122.0 203.135 4.760 -999.990 -999.990 2.031 ..P WKT 2011 04 18 20 44 55 31.3200 -97.3300 251.000 457.0 200.916 5.120 -999.990 -999.990 2.009 ..P WKT 2011 04 18 20 49 55 31.3200 -97.3300 251.000 30.0 199.193 5.060 -999.990 -999.990 1.992 ..P WKT 2011 04 18 20 54 55 31.3200 -97.3300 251.000 122.0 201.765 4.480 -999.990 -999.990 2.018 ..P WKT 2011 04 18 20 59 55 31.3200 -97.3300 251.000 457.0 201.198 4.510 -999.990 -999.990 2.012 ..P WKT 2011 04 18 21 09 55 31.3200 -97.3300 251.000 30.0 210.282 4.730 -999.990 -999.990 2.103 ..P WKT 2011 04 18 21 14 55 31.3200 -97.3300 251.000 122.0 208.700 4.440 -999.990 -999.990 2.087 ..P WKT 2011 04 18 21 19 55 31.3200 -97.3300 251.000 457.0 211.413 4.800 -999.990 -999.990 2.114 ..P WKT 2011 04 18 21 24 55 31.3200 -97.3300 251.000 30.0 210.658 5.970 -999.990 -999.990 2.107 ..P WKT 2011 04 18 21 29 55 31.3200 -97.3300 251.000 122.0 211.883 5.420 -999.990 -999.990 2.119 ..P WKT 2011 04 18 21 34 55 31.3200 -97.3300 251.000 457.0 204.358 5.050 -999.990 -999.990 2.044 ..P WKT 2011 04 18 21 44 55 31.3200 -97.3300 251.000 30.0 199.875 5.400 -999.990 -999.990 1.999 ..P WKT 2011 04 18 21 49 55 31.3200 -97.3300 251.000 122.0 203.083 5.020 -999.990 -999.990 2.031 ..P WKT 2011 04 18 21 54 55 31.3200 -97.3300 251.000 457.0 204.144 6.060 -999.990 -999.990 2.041 ..P WKT 2011 04 18 21 59 55 31.3200 -97.3300 251.000 30.0 200.418 5.210 -999.990 -999.990 2.004 ..P WKT 2011 04 18 22 04 55 31.3200 -97.3300 251.000 122.0 203.954 4.830 -999.990 -999.990 2.040 ..P WKT 2011 04 18 22 09 55 31.3200 -97.3300 251.000 457.0 202.704 4.960 -999.990 -999.990 2.027 ..P WKT 2011 04 18 22 19 55 31.3200 -97.3300 251.000 30.0 205.675 5.120 -999.990 -999.990 2.057 ..P WKT 2011 04 18 22 24 55 31.3200 -97.3300 251.000 122.0 208.244 5.210 -999.990 -999.990 2.082 ..P WKT 2011 04 18 22 29 55 31.3200 -97.3300 251.000 457.0 209.163 5.480 -999.990 -999.990 2.092 ..P WKT 2011 04 18 22 34 55 31.3200 -97.3300 251.000 30.0 200.511 5.940 -999.990 -999.990 2.005 ..P WKT 2011 04 18 22 39 55 31.3200 -97.3300 251.000 122.0 206.380 5.990 -999.990 -999.990 2.064 ..P WKT 2011 04 18 22 44 55 31.3200 -97.3300 251.000 457.0 200.368 6.670 -999.990 -999.990 2.004 ..P WKT 2011 04 18 22 54 55 31.3200 -97.3300 251.000 30.0 195.394 6.630 -999.990 -999.990 1.954 ..P WKT 2011 04 18 22 59 55 31.3200 -97.3300 251.000 122.0 201.381 6.420 -999.990 -999.990 2.014 ..P WKT 2011 04 18 23 04 55 31.3200 -97.3300 251.000 457.0 200.108 5.710 -999.990 -999.990 2.001 ..P WKT 2011 04 18 23 09 55 31.3200 -97.3300 251.000 30.0 190.917 5.230 -999.990 -999.990 1.909 ..P WKT 2011 04 18 23 14 55 31.3200 -97.3300 251.000 122.0 198.223 5.520 -999.990 -999.990 1.982 ..P WKT 2011 04 18 23 19 55 31.3200 -97.3300 251.000 457.0 194.476 5.230 -999.990 -999.990 1.945 ..P WKT 2011 04 18 23 29 55 31.3200 -97.3300 251.000 30.0 190.994 4.920 -999.990 -999.990 1.910 ..P WKT 2011 04 18 23 34 55 31.3200 -97.3300 251.000 122.0 195.712 4.990 -999.990 -999.990 1.957 ..P WKT 2011 04 18 23 39 55 31.3200 -97.3300 251.000 457.0 192.019 5.050 -999.990 -999.990 1.920 ..P WKT 2011 04 18 23 44 55 31.3200 -97.3300 251.000 30.0 182.884 5.400 -999.990 -999.990 1.829 ..P WKT 2011 04 18 23 49 55 31.3200 -97.3300 251.000 122.0 189.087 5.240 -999.990 -999.990 1.891 ..P WKT 2011 04 19 00 09 55 31.3200 -97.3300 251.000 457.0 192.164 5.090 -999.990 -999.990 1.922 ..P WKT 2011 04 19 00 10 25 31.3200 -97.3300 251.000 457.0 188.820 5.110 -999.990 -999.990 1.888 ..P WKT 2011 04 19 00 10 55 31.3200 -97.3300 251.000 457.0 187.453 4.980 -999.990 -999.990 1.875 ..P WKT 2011 04 19 00 11 25 31.3200 -97.3300 251.000 457.0 186.582 5.220 -999.990 -999.990 1.866 ..P WKT 2011 04 19 00 11 55 31.3200 -97.3300 251.000 457.0 187.525 4.940 -999.990 -999.990 1.875 ..P WKT 2011 04 19 00 12 25 31.3200 -97.3300 251.000 457.0 187.974 4.890 -999.990 -999.990 1.880 ..P WKT 2011 04 19 00 12 55 31.3200 -97.3300 251.000 457.0 188.751 4.950 -999.990 -999.990 1.888 ..P WKT 2011 04 19 00 13 25 31.3200 -97.3300 251.000 457.0 184.087 5.510 -999.990 -999.990 1.841 ..P WKT 2011 04 19 00 13 55 31.3200 -97.3300 251.000 457.0 190.473 5.300 -999.990 -999.990 1.905 ..P WKT 2011 04 19 00 14 25 31.3200 -97.3300 251.000 457.0 186.798 4.960 -999.990 -999.990 1.868 ..P WKT 2011 04 19 00 14 55 31.3200 -97.3300 251.000 457.0 186.091 4.930 -999.990 -999.990 1.861 ..P WKT 2011 04 19 00 19 55 31.3200 -97.3300 251.000 30.0 193.049 5.310 -999.990 -999.990 1.930 ..P WKT 2011 04 19 00 24 55 31.3200 -97.3300 251.000 122.0 196.379 5.780 -999.990 -999.990 1.964 ..P WKT 2011 04 19 00 29 55 31.3200 -97.3300 251.000 457.0 190.634 5.310 -999.990 -999.990 1.906 ..P WKT 2011 04 19 00 34 55 31.3200 -97.3300 251.000 30.0 189.839 5.770 -999.990 -999.990 1.898 ..P WKT 2011 04 19 00 39 55 31.3200 -97.3300 251.000 122.0 195.149 6.210 -999.990 -999.990 1.951 ..P WKT 2011 04 19 00 44 55 31.3200 -97.3300 251.000 457.0 197.160 5.890 -999.990 -999.990 1.972 ..P WKT 2011 04 19 00 54 55 31.3200 -97.3300 251.000 30.0 200.659 6.280 -999.990 -999.990 2.007 ..P WKT 2011 04 19 00 59 55 31.3200 -97.3300 251.000 122.0 202.642 5.900 -999.990 -999.990 2.026 ..P WKT 2011 04 19 01 04 55 31.3200 -97.3300 251.000 457.0 196.040 8.030 -999.990 -999.990 1.960 ..P WKT 2011 04 19 01 09 55 31.3200 -97.3300 251.000 30.0 202.151 5.650 -999.990 -999.990 2.022 ..P WKT 2011 04 19 01 14 55 31.3200 -97.3300 251.000 122.0 214.706 4.760 -999.990 -999.990 2.147 ..P WKT 2011 04 19 01 19 55 31.3200 -97.3300 251.000 457.0 201.330 4.930 -999.990 -999.990 2.013 ..P WKT 2011 04 19 01 29 55 31.3200 -97.3300 251.000 30.0 201.500 4.390 -999.990 -999.990 2.015 ..P WKT 2011 04 19 01 34 55 31.3200 -97.3300 251.000 122.0 205.798 4.390 -999.990 -999.990 2.058 ..P WKT 2011 04 19 01 39 55 31.3200 -97.3300 251.000 457.0 198.860 5.120 -999.990 -999.990 1.989 ..P WKT 2011 04 19 01 44 55 31.3200 -97.3300 251.000 30.0 200.515 4.760 -999.990 -999.990 2.005 ..P WKT 2011 04 19 01 49 55 31.3200 -97.3300 251.000 122.0 206.798 5.420 -999.990 -999.990 2.068 ..P WKT 2011 04 19 01 54 55 31.3200 -97.3300 251.000 457.0 204.817 4.640 -999.990 -999.990 2.048 ..P WKT 2011 04 19 02 04 55 31.3200 -97.3300 251.000 30.0 205.105 4.540 -999.990 -999.990 2.051 ..P WKT 2011 04 19 02 09 55 31.3200 -97.3300 251.000 122.0 207.376 4.590 -999.990 -999.990 2.074 ..P WKT 2011 04 19 02 14 55 31.3200 -97.3300 251.000 457.0 204.355 4.260 -999.990 -999.990 2.044 ..P WKT 2011 04 19 02 19 55 31.3200 -97.3300 251.000 30.0 199.347 4.780 -999.990 -999.990 1.993 ..P WKT 2011 04 19 02 24 55 31.3200 -97.3300 251.000 122.0 210.221 5.480 -999.990 -999.990 2.102 ..P WKT 2011 04 19 02 29 55 31.3200 -97.3300 251.000 457.0 197.602 5.020 -999.990 -999.990 1.976 ..P WKT 2011 04 19 02 39 55 31.3200 -97.3300 251.000 30.0 189.851 4.050 -999.990 -999.990 1.899 ..P WKT 2011 04 19 02 44 55 31.3200 -97.3300 251.000 122.0 202.336 4.180 -999.990 -999.990 2.023 ..P WKT 2011 04 19 02 49 55 31.3200 -97.3300 251.000 457.0 201.581 4.650 -999.990 -999.990 2.016 ..P WKT 2011 04 19 02 54 55 31.3200 -97.3300 251.000 30.0 207.118 3.980 -999.990 -999.990 2.071 ..P WKT 2011 04 19 02 59 55 31.3200 -97.3300 251.000 122.0 203.052 4.090 -999.990 -999.990 2.031 ..P WKT 2011 04 19 03 04 55 31.3200 -97.3300 251.000 457.0 205.940 5.080 -999.990 -999.990 2.059 ..P WKT 2011 04 19 03 14 55 31.3200 -97.3300 251.000 30.0 203.910 4.160 -999.990 -999.990 2.039 ..P WKT 2011 04 19 03 19 55 31.3200 -97.3300 251.000 122.0 206.610 5.850 -999.990 -999.990 2.066 ..P WKT 2011 04 19 03 24 55 31.3200 -97.3300 251.000 457.0 202.353 5.010 -999.990 -999.990 2.024 ..P WKT 2011 04 19 03 29 55 31.3200 -97.3300 251.000 30.0 204.722 6.210 -999.990 -999.990 2.047 ..P WKT 2011 04 19 03 34 55 31.3200 -97.3300 251.000 122.0 209.079 5.790 -999.990 -999.990 2.091 ..P WKT 2011 04 19 03 39 55 31.3200 -97.3300 251.000 457.0 196.701 4.200 -999.990 -999.990 1.967 ..P WKT 2011 04 19 03 49 55 31.3200 -97.3300 251.000 30.0 202.032 4.500 -999.990 -999.990 2.020 ..P WKT 2011 04 19 03 54 55 31.3200 -97.3300 251.000 122.0 198.695 5.300 -999.990 -999.990 1.987 ..P WKT 2011 04 19 03 59 55 31.3200 -97.3300 251.000 457.0 188.559 5.680 -999.990 -999.990 1.886 ..P WKT 2011 04 19 04 04 55 31.3200 -97.3300 251.000 30.0 189.863 6.570 -999.990 -999.990 1.899 ..P WKT 2011 04 19 04 09 55 31.3200 -97.3300 251.000 122.0 190.337 6.210 -999.990 -999.990 1.903 ..P WKT 2011 04 19 04 14 55 31.3200 -97.3300 251.000 457.0 188.325 4.450 -999.990 -999.990 1.883 ..P WKT 2011 04 19 04 24 55 31.3200 -97.3300 251.000 30.0 188.372 4.600 -999.990 -999.990 1.884 ..P WKT 2011 04 19 04 29 55 31.3200 -97.3300 251.000 122.0 191.762 5.900 -999.990 -999.990 1.918 ..P WKT 2011 04 19 04 34 55 31.3200 -97.3300 251.000 457.0 185.363 6.380 -999.990 -999.990 1.854 ..P WKT 2011 04 19 04 39 55 31.3200 -97.3300 251.000 30.0 186.596 5.270 -999.990 -999.990 1.866 ..P WKT 2011 04 19 04 44 55 31.3200 -97.3300 251.000 122.0 191.480 4.200 -999.990 -999.990 1.915 ..P WKT 2011 04 19 04 49 55 31.3200 -97.3300 251.000 457.0 192.050 3.970 -999.990 -999.990 1.921 ..P WKT 2011 04 19 05 04 55 31.3200 -97.3300 251.000 30.0 196.619 3.570 -999.990 -999.990 1.966 ..P WKT 2011 04 19 05 09 55 31.3200 -97.3300 251.000 122.0 199.532 3.990 -999.990 -999.990 1.995 ..P WKT 2011 04 19 05 14 55 31.3200 -97.3300 251.000 457.0 197.631 3.860 -999.990 -999.990 1.976 ..P WKT 2011 04 19 05 19 55 31.3200 -97.3300 251.000 30.0 193.236 3.970 -999.990 -999.990 1.932 ..P WKT 2011 04 19 05 24 55 31.3200 -97.3300 251.000 122.0 190.170 4.020 -999.990 -999.990 1.902 ..P WKT 2011 04 19 05 29 55 31.3200 -97.3300 251.000 457.0 192.087 3.900 -999.990 -999.990 1.921 ..P WKT 2011 04 19 05 39 55 31.3200 -97.3300 251.000 30.0 188.023 4.390 -999.990 -999.990 1.880 ..P WKT 2011 04 19 05 44 55 31.3200 -97.3300 251.000 122.0 193.342 3.830 -999.990 -999.990 1.933 ..P WKT 2011 04 19 05 49 55 31.3200 -97.3300 251.000 457.0 188.357 3.660 -999.990 -999.990 1.884 ..P WKT 2011 04 19 05 54 55 31.3200 -97.3300 251.000 30.0 185.033 4.460 -999.990 -999.990 1.850 ..P WKT 2011 04 19 05 59 55 31.3200 -97.3300 251.000 122.0 192.680 3.890 -999.990 -999.990 1.927 ..P WKT 2011 04 19 06 04 55 31.3200 -97.3300 251.000 457.0 183.703 3.600 -999.990 -999.990 1.837 ..P WKT 2011 04 19 06 14 55 31.3200 -97.3300 251.000 30.0 186.411 4.170 -999.990 -999.990 1.864 ..P WKT 2011 04 19 06 19 55 31.3200 -97.3300 251.000 122.0 189.120 3.500 -999.990 -999.990 1.891 ..P WKT 2011 04 19 06 24 55 31.3200 -97.3300 251.000 457.0 191.497 4.010 -999.990 -999.990 1.915 ..P WKT 2011 04 19 06 29 55 31.3200 -97.3300 251.000 30.0 176.905 3.950 -999.990 -999.990 1.769 ..P WKT 2011 04 19 06 34 55 31.3200 -97.3300 251.000 122.0 187.268 4.230 -999.990 -999.990 1.873 ..P WKT 2011 04 19 06 39 55 31.3200 -97.3300 251.000 457.0 185.984 3.760 -999.990 -999.990 1.860 ..P WKT 2011 04 19 06 49 55 31.3200 -97.3300 251.000 30.0 181.776 3.120 -999.990 -999.990 1.818 ..P WKT 2011 04 19 06 54 55 31.3200 -97.3300 251.000 122.0 186.508 3.600 -999.990 -999.990 1.865 ..P WKT 2011 04 19 06 59 55 31.3200 -97.3300 251.000 457.0 181.586 5.460 -999.990 -999.990 1.816 ..P WKT 2011 04 19 07 04 55 31.3200 -97.3300 251.000 30.0 178.993 3.600 -999.990 -999.990 1.790 ..P WKT 2011 04 19 07 09 55 31.3200 -97.3300 251.000 122.0 184.059 3.620 -999.990 -999.990 1.841 ..P WKT 2011 04 19 07 14 55 31.3200 -97.3300 251.000 457.0 186.628 3.250 -999.990 -999.990 1.866 ..P WKT 2011 04 19 07 24 55 31.3200 -97.3300 251.000 30.0 183.558 3.530 -999.990 -999.990 1.836 ..P WKT 2011 04 19 07 29 55 31.3200 -97.3300 251.000 122.0 185.915 3.570 -999.990 -999.990 1.859 ..P WKT 2011 04 19 07 34 55 31.3200 -97.3300 251.000 457.0 180.274 4.090 -999.990 -999.990 1.803 ..P WKT 2011 04 19 07 39 55 31.3200 -97.3300 251.000 30.0 181.630 4.050 -999.990 -999.990 1.816 ..P WKT 2011 04 19 07 44 55 31.3200 -97.3300 251.000 122.0 186.152 3.680 -999.990 -999.990 1.862 ..P WKT 2011 04 19 07 49 55 31.3200 -97.3300 251.000 457.0 186.343 3.760 -999.990 -999.990 1.863 ..P WKT 2011 04 19 07 59 55 31.3200 -97.3300 251.000 30.0 187.153 3.100 -999.990 -999.990 1.872 ..P WKT 2011 04 19 08 04 55 31.3200 -97.3300 251.000 122.0 198.108 3.830 -999.990 -999.990 1.981 ..P WKT 2011 04 19 08 09 55 31.3200 -97.3300 251.000 457.0 197.061 4.220 -999.990 -999.990 1.971 ..P WKT 2011 04 19 08 14 55 31.3200 -97.3300 251.000 30.0 192.847 4.250 -999.990 -999.990 1.928 ..P WKT 2011 04 19 08 19 55 31.3200 -97.3300 251.000 122.0 200.637 4.400 -999.990 -999.990 2.006 ..P WKT 2011 04 19 08 24 55 31.3200 -97.3300 251.000 457.0 203.927 4.130 -999.990 -999.990 2.039 ..P WKT 2011 04 19 08 34 55 31.3200 -97.3300 251.000 30.0 196.353 3.510 -999.990 -999.990 1.964 ..P WKT 2011 04 19 08 39 55 31.3200 -97.3300 251.000 122.0 200.501 3.990 -999.990 -999.990 2.005 ..P WKT 2011 04 19 08 44 55 31.3200 -97.3300 251.000 457.0 203.816 4.290 -999.990 -999.990 2.038 ..P WKT 2011 04 19 08 49 55 31.3200 -97.3300 251.000 30.0 202.793 3.690 -999.990 -999.990 2.028 ..P WKT 2011 04 19 08 54 55 31.3200 -97.3300 251.000 122.0 204.941 3.230 -999.990 -999.990 2.049 ..P WKT 2011 04 19 08 59 55 31.3200 -97.3300 251.000 457.0 209.259 3.190 -999.990 -999.990 2.093 ..P WKT 2011 04 19 09 09 55 31.3200 -97.3300 251.000 30.0 211.434 2.980 -999.990 -999.990 2.114 ..P WKT 2011 04 19 09 14 55 31.3200 -97.3300 251.000 122.0 218.974 3.820 -999.990 -999.990 2.190 ..P WKT 2011 04 19 09 19 55 31.3200 -97.3300 251.000 457.0 215.662 3.570 -999.990 -999.990 2.157 ..P WKT 2011 04 19 09 24 55 31.3200 -97.3300 251.000 30.0 215.689 3.690 -999.990 -999.990 2.157 ..P WKT 2011 04 19 09 29 55 31.3200 -97.3300 251.000 122.0 221.394 3.920 -999.990 -999.990 2.214 ..P WKT 2011 04 19 09 34 55 31.3200 -97.3300 251.000 457.0 220.754 5.060 -999.990 -999.990 2.208 ..P WKT 2011 04 19 09 44 55 31.3200 -97.3300 251.000 30.0 215.583 4.660 -999.990 -999.990 2.156 ..P WKT 2011 04 19 09 49 55 31.3200 -97.3300 251.000 122.0 221.410 4.200 -999.990 -999.990 2.214 ..P WKT 2011 04 19 09 54 55 31.3200 -97.3300 251.000 457.0 225.903 3.740 -999.990 -999.990 2.259 ..P WKT 2011 04 19 09 59 55 31.3200 -97.3300 251.000 30.0 218.362 3.540 -999.990 -999.990 2.184 ..P WKT 2011 04 19 10 04 55 31.3200 -97.3300 251.000 122.0 222.521 4.070 -999.990 -999.990 2.225 ..P WKT 2011 04 19 10 09 55 31.3200 -97.3300 251.000 457.0 221.999 4.390 -999.990 -999.990 2.220 ..P WKT 2011 04 19 10 19 55 31.3200 -97.3300 251.000 30.0 222.341 2.740 -999.990 -999.990 2.223 ..P WKT 2011 04 19 10 24 55 31.3200 -97.3300 251.000 122.0 224.208 2.920 -999.990 -999.990 2.242 ..P WKT 2011 04 19 10 29 55 31.3200 -97.3300 251.000 457.0 212.362 4.400 -999.990 -999.990 2.124 ..P WKT 2011 04 19 10 34 55 31.3200 -97.3300 251.000 30.0 206.536 3.660 -999.990 -999.990 2.065 ..P WKT 2011 04 19 10 39 55 31.3200 -97.3300 251.000 122.0 213.754 3.020 -999.990 -999.990 2.138 ..P WKT 2011 04 19 10 44 55 31.3200 -97.3300 251.000 457.0 212.944 3.230 -999.990 -999.990 2.129 ..P WKT 2011 04 19 10 54 55 31.3200 -97.3300 251.000 30.0 208.815 3.630 -999.990 -999.990 2.088 ..P WKT 2011 04 19 10 59 55 31.3200 -97.3300 251.000 122.0 219.216 3.860 -999.990 -999.990 2.192 ..P WKT 2011 04 19 11 04 55 31.3200 -97.3300 251.000 457.0 212.215 3.660 -999.990 -999.990 2.122 ..P WKT 2011 04 19 11 09 55 31.3200 -97.3300 251.000 30.0 209.228 4.080 -999.990 -999.990 2.092 ..P WKT 2011 04 19 11 14 55 31.3200 -97.3300 251.000 122.0 217.792 4.230 -999.990 -999.990 2.178 ..P WKT 2011 04 19 11 19 55 31.3200 -97.3300 251.000 457.0 208.109 4.420 -999.990 -999.990 2.081 ..P WKT 2011 04 19 11 29 55 31.3200 -97.3300 251.000 30.0 203.456 5.020 -999.990 -999.990 2.035 ..P WKT 2011 04 19 11 34 55 31.3200 -97.3300 251.000 122.0 211.502 4.520 -999.990 -999.990 2.115 ..P WKT 2011 04 19 11 39 55 31.3200 -97.3300 251.000 457.0 206.486 4.830 -999.990 -999.990 2.065 ..P WKT 2011 04 19 11 44 55 31.3200 -97.3300 251.000 30.0 209.676 4.580 -999.990 -999.990 2.097 ..P WKT 2011 04 19 11 49 55 31.3200 -97.3300 251.000 122.0 216.218 4.610 -999.990 -999.990 2.162 ..P WKT 2011 04 19 12 09 55 31.3200 -97.3300 251.000 457.0 221.395 3.110 -999.990 -999.990 2.214 ..P WKT 2011 04 19 12 10 25 31.3200 -97.3300 251.000 457.0 225.557 3.350 -999.990 -999.990 2.256 ..P WKT 2011 04 19 12 10 55 31.3200 -97.3300 251.000 457.0 226.536 3.350 -999.990 -999.990 2.265 ..P WKT 2011 04 19 12 11 25 31.3200 -97.3300 251.000 457.0 226.006 4.400 -999.990 -999.990 2.260 ..P WKT 2011 04 19 12 11 55 31.3200 -97.3300 251.000 457.0 224.639 5.310 -999.990 -999.990 2.246 ..P WKT 2011 04 19 12 12 25 31.3200 -97.3300 251.000 457.0 233.323 3.280 -999.990 -999.990 2.333 ..P WKT 2011 04 19 12 12 55 31.3200 -97.3300 251.000 457.0 234.469 3.530 -999.990 -999.990 2.345 ..P WKT 2011 04 19 12 13 25 31.3200 -97.3300 251.000 457.0 225.730 5.240 -999.990 -999.990 2.257 ..P WKT 2011 04 19 12 13 55 31.3200 -97.3300 251.000 457.0 223.692 3.440 -999.990 -999.990 2.237 ..P WKT 2011 04 19 12 14 25 31.3200 -97.3300 251.000 457.0 223.833 4.050 -999.990 -999.990 2.238 ..P WKT 2011 04 19 12 14 55 31.3200 -97.3300 251.000 457.0 226.990 4.360 -999.990 -999.990 2.270 ..P WKT 2011 04 19 12 19 55 31.3200 -97.3300 251.000 30.0 221.191 3.390 -999.990 -999.990 2.212 ..P WKT 2011 04 19 12 24 55 31.3200 -97.3300 251.000 122.0 224.941 3.180 -999.990 -999.990 2.249 ..P WKT 2011 04 19 12 29 55 31.3200 -97.3300 251.000 457.0 225.341 4.550 -999.990 -999.990 2.253 ..P WKT 2011 04 19 12 34 55 31.3200 -97.3300 251.000 30.0 224.568 4.580 -999.990 -999.990 2.246 ..P WKT 2011 04 19 12 39 55 31.3200 -97.3300 251.000 122.0 224.466 3.400 -999.990 -999.990 2.245 ..P WKT 2011 04 19 12 44 55 31.3200 -97.3300 251.000 457.0 230.056 3.480 -999.990 -999.990 2.301 ..P WKT 2011 04 19 12 54 55 31.3200 -97.3300 251.000 30.0 225.117 2.880 -999.990 -999.990 2.251 ..P WKT 2011 04 19 12 59 55 31.3200 -97.3300 251.000 122.0 226.309 3.760 -999.990 -999.990 2.263 ..P WKT 2011 04 19 13 04 55 31.3200 -97.3300 251.000 457.0 224.822 3.100 -999.990 -999.990 2.248 ..P WKT 2011 04 19 13 09 55 31.3200 -97.3300 251.000 30.0 232.708 3.620 -999.990 -999.990 2.327 ..P WKT 2011 04 19 13 14 55 31.3200 -97.3300 251.000 122.0 236.410 3.560 -999.990 -999.990 2.364 ..P WKT 2011 04 19 13 19 55 31.3200 -97.3300 251.000 457.0 234.755 3.410 -999.990 -999.990 2.348 ..P WKT 2011 04 19 13 29 55 31.3200 -97.3300 251.000 30.0 237.565 3.380 -999.990 -999.990 2.376 ..P WKT 2011 04 19 13 34 55 31.3200 -97.3300 251.000 122.0 240.691 3.340 -999.990 -999.990 2.407 ..P WKT 2011 04 19 13 39 55 31.3200 -97.3300 251.000 457.0 239.801 2.870 -999.990 -999.990 2.398 ..P WKT 2011 04 19 13 44 55 31.3200 -97.3300 251.000 30.0 239.245 2.660 -999.990 -999.990 2.392 ..P WKT 2011 04 19 13 49 55 31.3200 -97.3300 251.000 122.0 245.381 3.870 -999.990 -999.990 2.454 ..P WKT 2011 04 19 13 54 55 31.3200 -97.3300 251.000 457.0 250.512 3.300 -999.990 -999.990 2.505 ..P WKT 2011 04 19 14 04 55 31.3200 -97.3300 251.000 30.0 248.636 3.040 -999.990 -999.990 2.486 ..P WKT 2011 04 19 14 09 55 31.3200 -97.3300 251.000 122.0 249.991 2.990 -999.990 -999.990 2.500 ..P WKT 2011 04 19 14 14 55 31.3200 -97.3300 251.000 457.0 251.013 4.070 -999.990 -999.990 2.510 ..P WKT 2011 04 19 14 19 55 31.3200 -97.3300 251.000 30.0 250.695 3.510 -999.990 -999.990 2.507 ..P WKT 2011 04 19 14 24 55 31.3200 -97.3300 251.000 122.0 259.071 4.150 -999.990 -999.990 2.591 ..P WKT 2011 04 19 14 29 55 31.3200 -97.3300 251.000 457.0 251.733 3.420 -999.990 -999.990 2.517 ..P WKT 2011 04 19 14 39 55 31.3200 -97.3300 251.000 30.0 250.097 3.480 -999.990 -999.990 2.501 ..P WKT 2011 04 19 14 44 55 31.3200 -97.3300 251.000 122.0 251.117 3.000 -999.990 -999.990 2.511 ..P WKT 2011 04 19 14 49 55 31.3200 -97.3300 251.000 457.0 241.443 3.510 -999.990 -999.990 2.414 ..P WKT 2011 04 19 14 54 55 31.3200 -97.3300 251.000 30.0 246.139 3.590 -999.990 -999.990 2.461 ..P WKT 2011 04 19 14 59 55 31.3200 -97.3300 251.000 122.0 246.824 3.270 -999.990 -999.990 2.468 ..P WKT 2011 04 19 15 04 55 31.3200 -97.3300 251.000 457.0 247.677 4.880 -999.990 -999.990 2.477 ..P WKT 2011 04 19 15 14 55 31.3200 -97.3300 251.000 30.0 250.767 3.650 -999.990 -999.990 2.508 ..P WKT 2011 04 19 15 19 55 31.3200 -97.3300 251.000 122.0 255.342 3.720 -999.990 -999.990 2.553 ..P WKT 2011 04 19 15 24 55 31.3200 -97.3300 251.000 457.0 254.572 4.080 -999.990 -999.990 2.546 ..P WKT 2011 04 19 15 29 55 31.3200 -97.3300 251.000 30.0 250.796 4.570 -999.990 -999.990 2.508 ..P WKT 2011 04 19 15 34 55 31.3200 -97.3300 251.000 122.0 255.703 4.370 -999.990 -999.990 2.557 ..P WKT 2011 04 19 15 39 55 31.3200 -97.3300 251.000 457.0 263.448 4.460 -999.990 -999.990 2.634 ..P WKT 2011 04 19 15 49 55 31.3200 -97.3300 251.000 30.0 259.784 5.390 -999.990 -999.990 2.598 ..P WKT 2011 04 19 15 54 55 31.3200 -97.3300 251.000 122.0 265.404 5.350 -999.990 -999.990 2.654 ..P WKT 2011 04 19 15 59 55 31.3200 -97.3300 251.000 457.0 260.509 4.830 -999.990 -999.990 2.605 ..P WKT 2011 04 19 16 04 55 31.3200 -97.3300 251.000 30.0 261.289 4.720 -999.990 -999.990 2.613 ..P WKT 2011 04 19 16 09 55 31.3200 -97.3300 251.000 122.0 260.232 5.030 -999.990 -999.990 2.602 ..P WKT 2011 04 19 16 14 55 31.3200 -97.3300 251.000 457.0 258.676 5.000 -999.990 -999.990 2.587 ..P WKT 2011 04 19 16 24 55 31.3200 -97.3300 251.000 30.0 254.872 4.730 -999.990 -999.990 2.549 ..P WKT 2011 04 19 16 29 55 31.3200 -97.3300 251.000 122.0 260.633 4.470 -999.990 -999.990 2.606 ..P WKT 2011 04 19 16 34 55 31.3200 -97.3300 251.000 457.0 255.716 3.990 -999.990 -999.990 2.557 ..P WKT 2011 04 19 16 39 55 31.3200 -97.3300 251.000 30.0 252.469 4.000 -999.990 -999.990 2.525 ..P WKT 2011 04 19 16 44 55 31.3200 -97.3300 251.000 122.0 250.223 3.440 -999.990 -999.990 2.502 ..P WKT 2011 04 19 16 49 55 31.3200 -97.3300 251.000 457.0 248.477 3.580 -999.990 -999.990 2.485 ..P WKT 2011 04 19 17 04 55 31.3200 -97.3300 251.000 30.0 243.504 3.650 -999.990 -999.990 2.435 ..P WKT 2011 04 19 17 09 55 31.3200 -97.3300 251.000 122.0 245.975 3.470 -999.990 -999.990 2.460 ..P WKT 2011 04 19 17 14 55 31.3200 -97.3300 251.000 457.0 237.778 3.610 -999.990 -999.990 2.378 ..P WKT 2011 04 19 17 19 55 31.3200 -97.3300 251.000 30.0 247.249 3.980 -999.990 -999.990 2.472 ..P WKT 2011 04 19 17 24 55 31.3200 -97.3300 251.000 122.0 243.053 4.320 -999.990 -999.990 2.431 ..P WKT 2011 04 19 17 29 55 31.3200 -97.3300 251.000 457.0 241.857 4.380 -999.990 -999.990 2.419 ..P WKT 2011 04 19 17 39 55 31.3200 -97.3300 251.000 30.0 241.488 4.470 -999.990 -999.990 2.415 ..P WKT 2011 04 19 17 44 55 31.3200 -97.3300 251.000 122.0 243.981 4.150 -999.990 -999.990 2.440 ..P WKT 2011 04 19 17 49 55 31.3200 -97.3300 251.000 457.0 241.477 4.430 -999.990 -999.990 2.415 ..P WKT 2011 04 19 17 54 55 31.3200 -97.3300 251.000 30.0 245.969 3.990 -999.990 -999.990 2.460 ..P WKT 2011 04 19 17 59 55 31.3200 -97.3300 251.000 122.0 246.130 3.780 -999.990 -999.990 2.461 ..P WKT 2011 04 19 18 04 55 31.3200 -97.3300 251.000 457.0 246.956 3.790 -999.990 -999.990 2.470 ..P WKT 2011 04 19 18 14 55 31.3200 -97.3300 251.000 30.0 254.080 3.890 -999.990 -999.990 2.541 ..P WKT 2011 04 19 18 19 55 31.3200 -97.3300 251.000 122.0 257.713 3.540 -999.990 -999.990 2.577 ..P WKT 2011 04 19 18 24 55 31.3200 -97.3300 251.000 457.0 254.685 3.410 -999.990 -999.990 2.547 ..P WKT 2011 04 19 18 29 55 31.3200 -97.3300 251.000 30.0 245.332 3.420 -999.990 -999.990 2.453 ..P WKT 2011 04 19 18 34 55 31.3200 -97.3300 251.000 122.0 253.958 3.530 -999.990 -999.990 2.540 ..P WKT 2011 04 19 18 39 55 31.3200 -97.3300 251.000 457.0 247.936 4.580 -999.990 -999.990 2.479 ..P WKT 2011 04 19 18 49 55 31.3200 -97.3300 251.000 30.0 252.939 3.360 -999.990 -999.990 2.529 ..P WKT 2011 04 19 18 54 55 31.3200 -97.3300 251.000 122.0 259.969 4.670 -999.990 -999.990 2.600 ..P WKT 2011 04 19 18 59 55 31.3200 -97.3300 251.000 457.0 249.361 3.290 -999.990 -999.990 2.494 ..P WKT 2011 04 19 19 04 55 31.3200 -97.3300 251.000 30.0 253.728 4.360 -999.990 -999.990 2.537 ..P WKT 2011 04 19 19 09 55 31.3200 -97.3300 251.000 122.0 250.275 3.510 -999.990 -999.990 2.503 ..P WKT 2011 04 19 19 14 55 31.3200 -97.3300 251.000 457.0 245.325 3.410 -999.990 -999.990 2.453 ..P WKT 2011 04 19 19 24 55 31.3200 -97.3300 251.000 30.0 248.236 4.190 -999.990 -999.990 2.482 ..P WKT 2011 04 19 19 29 55 31.3200 -97.3300 251.000 122.0 247.279 4.850 -999.990 -999.990 2.473 ..P WKT 2011 04 19 19 34 55 31.3200 -97.3300 251.000 457.0 248.817 3.800 -999.990 -999.990 2.488 ..P WKT 2011 04 19 19 39 55 31.3200 -97.3300 251.000 30.0 247.694 4.510 -999.990 -999.990 2.477 ..P WKT 2011 04 19 19 44 55 31.3200 -97.3300 251.000 122.0 252.059 4.140 -999.990 -999.990 2.521 ..P WKT 2011 04 19 19 49 55 31.3200 -97.3300 251.000 457.0 251.269 3.770 -999.990 -999.990 2.513 ..P WKT 2011 04 19 19 59 55 31.3200 -97.3300 251.000 30.0 251.280 3.650 -999.990 -999.990 2.513 ..P WKT 2011 04 19 20 04 55 31.3200 -97.3300 251.000 122.0 245.764 4.850 -999.990 -999.990 2.458 ..P WKT 2011 04 19 20 09 55 31.3200 -97.3300 251.000 457.0 243.074 5.380 -999.990 -999.990 2.431 ..P WKT 2011 04 19 20 14 55 31.3200 -97.3300 251.000 30.0 245.538 4.550 -999.990 -999.990 2.455 ..P WKT 2011 04 19 20 19 55 31.3200 -97.3300 251.000 122.0 250.494 4.160 -999.990 -999.990 2.505 ..P WKT 2011 04 19 20 24 55 31.3200 -97.3300 251.000 457.0 243.651 3.820 -999.990 -999.990 2.437 ..P WKT 2011 04 19 20 34 55 31.3200 -97.3300 251.000 30.0 237.445 3.940 -999.990 -999.990 2.374 ..P WKT 2011 04 19 20 39 55 31.3200 -97.3300 251.000 122.0 244.226 4.830 -999.990 -999.990 2.442 ..P WKT 2011 04 19 20 44 55 31.3200 -97.3300 251.000 457.0 240.044 4.490 -999.990 -999.990 2.400 ..P WKT 2011 04 19 20 49 55 31.3200 -97.3300 251.000 30.0 245.993 4.200 -999.990 -999.990 2.460 ..P WKT 2011 04 19 20 54 55 31.3200 -97.3300 251.000 122.0 252.441 5.850 -999.990 -999.990 2.524 ..P WKT 2011 04 19 20 59 55 31.3200 -97.3300 251.000 457.0 250.252 3.530 -999.990 -999.990 2.503 ..P WKT 2011 04 19 21 09 55 31.3200 -97.3300 251.000 30.0 248.981 3.260 -999.990 -999.990 2.490 ..P WKT 2011 04 19 21 14 55 31.3200 -97.3300 251.000 122.0 248.240 3.310 -999.990 -999.990 2.482 ..P WKT 2011 04 19 21 19 55 31.3200 -97.3300 251.000 457.0 242.851 4.960 -999.990 -999.990 2.429 ..P WKT 2011 04 19 21 24 55 31.3200 -97.3300 251.000 30.0 240.450 3.850 -999.990 -999.990 2.405 ..P WKT 2011 04 19 21 29 55 31.3200 -97.3300 251.000 122.0 239.710 3.660 -999.990 -999.990 2.397 ..P WKT 2011 04 19 21 34 55 31.3200 -97.3300 251.000 457.0 234.654 3.910 -999.990 -999.990 2.347 ..P WKT 2011 04 19 21 44 55 31.3200 -97.3300 251.000 30.0 235.782 3.970 -999.990 -999.990 2.358 ..P WKT 2011 04 19 21 49 55 31.3200 -97.3300 251.000 122.0 234.662 4.090 -999.990 -999.990 2.347 ..P WKT 2011 04 19 21 54 55 31.3200 -97.3300 251.000 457.0 236.861 4.480 -999.990 -999.990 2.369 ..P WKT 2011 04 19 21 59 55 31.3200 -97.3300 251.000 30.0 231.760 4.260 -999.990 -999.990 2.318 ..P WKT 2011 04 19 22 04 55 31.3200 -97.3300 251.000 122.0 238.936 3.800 -999.990 -999.990 2.389 ..P WKT 2011 04 19 22 09 55 31.3200 -97.3300 251.000 457.0 236.159 3.560 -999.990 -999.990 2.362 ..P WKT 2011 04 19 22 19 55 31.3200 -97.3300 251.000 30.0 231.315 3.450 -999.990 -999.990 2.313 ..P WKT 2011 04 19 22 24 55 31.3200 -97.3300 251.000 122.0 228.917 4.190 -999.990 -999.990 2.289 ..P WKT 2011 04 19 22 29 55 31.3200 -97.3300 251.000 457.0 228.510 5.130 -999.990 -999.990 2.285 ..P WKT 2011 04 19 22 34 55 31.3200 -97.3300 251.000 30.0 232.413 3.600 -999.990 -999.990 2.324 ..P WKT 2011 04 19 22 39 55 31.3200 -97.3300 251.000 122.0 223.716 3.310 -999.990 -999.990 2.237 ..P WKT 2011 04 19 22 44 55 31.3200 -97.3300 251.000 457.0 229.609 3.740 -999.990 -999.990 2.296 ..P WKT 2011 04 19 22 54 55 31.3200 -97.3300 251.000 30.0 225.835 4.520 -999.990 -999.990 2.258 ..P WKT 2011 04 19 22 59 55 31.3200 -97.3300 251.000 122.0 230.424 3.450 -999.990 -999.990 2.304 ..P WKT 2011 04 19 23 04 55 31.3200 -97.3300 251.000 457.0 219.932 4.450 -999.990 -999.990 2.199 ..P WKT 2011 04 19 23 09 55 31.3200 -97.3300 251.000 30.0 226.342 3.700 -999.990 -999.990 2.263 ..P WKT 2011 04 19 23 14 55 31.3200 -97.3300 251.000 122.0 231.758 3.270 -999.990 -999.990 2.318 ..P WKT 2011 04 19 23 19 55 31.3200 -97.3300 251.000 457.0 228.558 3.220 -999.990 -999.990 2.286 ..P WKT 2011 04 19 23 29 55 31.3200 -97.3300 251.000 30.0 224.710 3.570 -999.990 -999.990 2.247 ..P WKT 2011 04 19 23 34 55 31.3200 -97.3300 251.000 122.0 226.876 3.560 -999.990 -999.990 2.269 ..P WKT 2011 04 19 23 39 55 31.3200 -97.3300 251.000 457.0 221.424 3.340 -999.990 -999.990 2.214 ..P WKT 2011 04 19 23 44 55 31.3200 -97.3300 251.000 30.0 217.298 4.030 -999.990 -999.990 2.173 ..P WKT 2011 04 19 23 49 55 31.3200 -97.3300 251.000 122.0 223.936 3.410 -999.990 -999.990 2.239 ..P WKT 2011 04 20 00 09 55 31.3200 -97.3300 251.000 457.0 207.296 3.360 -999.990 -999.990 2.073 ..P WKT 2011 04 20 00 10 25 31.3200 -97.3300 251.000 457.0 212.029 4.050 -999.990 -999.990 2.120 ..P WKT 2011 04 20 00 10 55 31.3200 -97.3300 251.000 457.0 209.479 5.450 -999.990 -999.990 2.095 ..P WKT 2011 04 20 00 11 25 31.3200 -97.3300 251.000 457.0 207.757 4.190 -999.990 -999.990 2.078 ..P WKT 2011 04 20 00 11 55 31.3200 -97.3300 251.000 457.0 209.510 3.500 -999.990 -999.990 2.095 ..P WKT 2011 04 20 00 12 25 31.3200 -97.3300 251.000 457.0 212.423 3.230 -999.990 -999.990 2.124 ..P WKT 2011 04 20 00 12 55 31.3200 -97.3300 251.000 457.0 211.528 3.300 -999.990 -999.990 2.115 ..P WKT 2011 04 20 00 13 25 31.3200 -97.3300 251.000 457.0 211.129 3.490 -999.990 -999.990 2.111 ..P WKT 2011 04 20 00 13 55 31.3200 -97.3300 251.000 457.0 206.261 3.770 -999.990 -999.990 2.063 ..P WKT 2011 04 20 00 14 25 31.3200 -97.3300 251.000 457.0 206.194 3.640 -999.990 -999.990 2.062 ..P WKT 2011 04 20 00 14 55 31.3200 -97.3300 251.000 457.0 202.981 3.780 -999.990 -999.990 2.030 ..P WKT 2011 04 20 00 19 55 31.3200 -97.3300 251.000 30.0 208.102 5.270 -999.990 -999.990 2.081 ..P WKT 2011 04 20 00 24 55 31.3200 -97.3300 251.000 122.0 211.070 3.850 -999.990 -999.990 2.111 ..P WKT 2011 04 20 00 29 55 31.3200 -97.3300 251.000 457.0 199.804 4.090 -999.990 -999.990 1.998 ..P WKT 2011 04 20 00 34 55 31.3200 -97.3300 251.000 30.0 200.785 4.230 -999.990 -999.990 2.008 ..P WKT 2011 04 20 00 39 55 31.3200 -97.3300 251.000 122.0 203.092 3.630 -999.990 -999.990 2.031 ..P WKT 2011 04 20 00 44 55 31.3200 -97.3300 251.000 457.0 193.481 3.600 -999.990 -999.990 1.935 ..P WKT 2011 04 20 00 54 55 31.3200 -97.3300 251.000 30.0 200.643 3.460 -999.990 -999.990 2.006 ..P WKT 2011 04 20 00 59 55 31.3200 -97.3300 251.000 122.0 202.519 3.770 -999.990 -999.990 2.025 ..P WKT 2011 04 20 01 04 55 31.3200 -97.3300 251.000 457.0 184.036 4.360 -999.990 -999.990 1.840 ..P WKT 2011 04 20 01 09 55 31.3200 -97.3300 251.000 30.0 201.304 3.500 -999.990 -999.990 2.013 ..P WKT 2011 04 20 01 14 55 31.3200 -97.3300 251.000 122.0 202.351 3.190 -999.990 -999.990 2.024 ..P WKT 2011 04 20 01 19 55 31.3200 -97.3300 251.000 457.0 187.181 3.000 -999.990 -999.990 1.872 ..P WKT 2011 04 20 01 29 55 31.3200 -97.3300 251.000 30.0 197.032 3.620 -999.990 -999.990 1.970 ..P WKT 2011 04 20 01 34 55 31.3200 -97.3300 251.000 122.0 197.228 3.150 -999.990 -999.990 1.972 ..P WKT 2011 04 20 01 39 55 31.3200 -97.3300 251.000 457.0 184.187 2.910 -999.990 -999.990 1.842 ..P WKT 2011 04 20 01 44 55 31.3200 -97.3300 251.000 30.0 191.665 3.050 -999.990 -999.990 1.917 ..P WKT 2011 04 20 01 49 55 31.3200 -97.3300 251.000 122.0 184.250 5.020 -999.990 -999.990 1.843 ..P WKT 2011 04 20 01 54 55 31.3200 -97.3300 251.000 457.0 182.462 4.500 -999.990 -999.990 1.825 ..P WKT 2011 04 20 02 04 55 31.3200 -97.3300 251.000 30.0 180.635 4.700 -999.990 -999.990 1.806 ..P WKT 2011 04 20 02 09 55 31.3200 -97.3300 251.000 122.0 181.588 3.530 -999.990 -999.990 1.816 ..P WKT 2011 04 20 02 14 55 31.3200 -97.3300 251.000 457.0 177.247 4.370 -999.990 -999.990 1.772 ..P WKT 2011 04 20 02 19 55 31.3200 -97.3300 251.000 30.0 180.517 2.760 -999.990 -999.990 1.805 ..P WKT 2011 04 20 02 24 55 31.3200 -97.3300 251.000 122.0 180.477 2.920 -999.990 -999.990 1.805 ..P WKT 2011 04 20 02 29 55 31.3200 -97.3300 251.000 457.0 181.431 3.050 -999.990 -999.990 1.814 ..P WKT 2011 04 20 02 39 55 31.3200 -97.3300 251.000 30.0 173.104 2.570 -999.990 -999.990 1.731 ..P WKT 2011 04 20 02 44 55 31.3200 -97.3300 251.000 122.0 184.339 2.720 -999.990 -999.990 1.843 ..P WKT 2011 04 20 02 49 55 31.3200 -97.3300 251.000 457.0 174.728 2.810 -999.990 -999.990 1.747 ..P WKT 2011 04 20 02 54 55 31.3200 -97.3300 251.000 30.0 183.976 2.980 -999.990 -999.990 1.840 ..P WKT 2011 04 20 02 59 55 31.3200 -97.3300 251.000 122.0 183.630 3.130 -999.990 -999.990 1.836 ..P WKT 2011 04 20 03 04 55 31.3200 -97.3300 251.000 457.0 166.081 3.590 -999.990 -999.990 1.661 ..P WKT 2011 04 20 03 14 55 31.3200 -97.3300 251.000 30.0 180.960 3.760 -999.990 -999.990 1.810 ..P WKT 2011 04 20 03 19 55 31.3200 -97.3300 251.000 122.0 176.999 3.820 -999.990 -999.990 1.770 ..P WKT 2011 04 20 03 24 55 31.3200 -97.3300 251.000 457.0 168.903 2.890 -999.990 -999.990 1.689 ..P WKT 2011 04 20 03 29 55 31.3200 -97.3300 251.000 30.0 177.511 3.190 -999.990 -999.990 1.775 ..P WKT 2011 04 20 03 34 55 31.3200 -97.3300 251.000 122.0 178.346 3.060 -999.990 -999.990 1.783 ..P WKT 2011 04 20 03 39 55 31.3200 -97.3300 251.000 457.0 165.785 4.490 -999.990 -999.990 1.658 ..P WKT 2011 04 20 03 49 55 31.3200 -97.3300 251.000 30.0 171.071 2.880 -999.990 -999.990 1.711 ..P WKT 2011 04 20 03 54 55 31.3200 -97.3300 251.000 122.0 173.039 2.910 -999.990 -999.990 1.730 ..P WKT 2011 04 20 03 59 55 31.3200 -97.3300 251.000 457.0 172.198 3.170 -999.990 -999.990 1.722 ..P WKT 2011 04 20 04 04 55 31.3200 -97.3300 251.000 30.0 165.733 3.720 -999.990 -999.990 1.657 ..P WKT 2011 04 20 04 09 55 31.3200 -97.3300 251.000 122.0 171.671 4.270 -999.990 -999.990 1.717 ..P WKT 2011 04 20 04 14 55 31.3200 -97.3300 251.000 457.0 171.656 2.620 -999.990 -999.990 1.717 ..P WKT 2011 04 20 04 24 55 31.3200 -97.3300 251.000 30.0 162.767 2.880 -999.990 -999.990 1.628 ..P WKT 2011 04 20 04 29 55 31.3200 -97.3300 251.000 122.0 166.791 2.900 -999.990 -999.990 1.668 ..P WKT 2011 04 20 04 34 55 31.3200 -97.3300 251.000 457.0 172.634 3.350 -999.990 -999.990 1.726 ..P WKT 2011 04 20 04 39 55 31.3200 -97.3300 251.000 30.0 161.611 2.880 -999.990 -999.990 1.616 ..P WKT 2011 04 20 04 44 55 31.3200 -97.3300 251.000 122.0 177.208 3.430 -999.990 -999.990 1.772 ..P WKT 2011 04 20 04 49 55 31.3200 -97.3300 251.000 457.0 183.216 4.060 -999.990 -999.990 1.832 ..P WKT 2011 04 20 05 04 55 31.3200 -97.3300 251.000 30.0 176.178 3.750 -999.990 -999.990 1.762 ..P WKT 2011 04 20 05 09 55 31.3200 -97.3300 251.000 122.0 175.607 3.200 -999.990 -999.990 1.756 ..P WKT 2011 04 20 05 14 55 31.3200 -97.3300 251.000 457.0 193.882 4.380 -999.990 -999.990 1.939 ..P WKT 2011 04 20 05 19 55 31.3200 -97.3300 251.000 30.0 180.417 4.120 -999.990 -999.990 1.804 ..P WKT 2011 04 20 05 24 55 31.3200 -97.3300 251.000 122.0 183.484 3.670 -999.990 -999.990 1.835 ..P WKT 2011 04 20 05 29 55 31.3200 -97.3300 251.000 457.0 199.111 2.700 -999.990 -999.990 1.991 ..P WKT 2011 04 20 05 39 55 31.3200 -97.3300 251.000 30.0 173.189 2.760 -999.990 -999.990 1.732 ..P WKT 2011 04 20 05 44 55 31.3200 -97.3300 251.000 122.0 174.944 3.640 -999.990 -999.990 1.749 ..P WKT 2011 04 20 05 49 55 31.3200 -97.3300 251.000 457.0 185.955 4.490 -999.990 -999.990 1.860 ..P WKT 2011 04 20 05 54 55 31.3200 -97.3300 251.000 30.0 177.463 5.000 -999.990 -999.990 1.775 ..P WKT 2011 04 20 05 59 55 31.3200 -97.3300 251.000 122.0 173.600 4.550 -999.990 -999.990 1.736 ..P WKT 2011 04 20 06 04 55 31.3200 -97.3300 251.000 457.0 193.864 3.210 -999.990 -999.990 1.939 ..P WKT 2011 04 20 06 14 55 31.3200 -97.3300 251.000 30.0 173.530 3.190 -999.990 -999.990 1.735 ..P WKT 2011 04 20 06 19 55 31.3200 -97.3300 251.000 122.0 180.856 4.330 -999.990 -999.990 1.809 ..P WKT 2011 04 20 06 24 55 31.3200 -97.3300 251.000 457.0 198.758 5.070 -999.990 -999.990 1.988 ..P WKT 2011 04 20 06 29 55 31.3200 -97.3300 251.000 30.0 181.958 4.000 -999.990 -999.990 1.820 ..P WKT 2011 04 20 06 34 55 31.3200 -97.3300 251.000 122.0 184.326 3.300 -999.990 -999.990 1.843 ..P WKT 2011 04 20 06 39 55 31.3200 -97.3300 251.000 457.0 191.321 4.190 -999.990 -999.990 1.913 ..P WKT 2011 04 20 06 49 55 31.3200 -97.3300 251.000 30.0 182.651 3.060 -999.990 -999.990 1.827 ..P WKT 2011 04 20 06 54 55 31.3200 -97.3300 251.000 122.0 195.900 4.440 -999.990 -999.990 1.959 ..P WKT 2011 04 20 06 59 55 31.3200 -97.3300 251.000 457.0 218.071 4.010 -999.990 -999.990 2.181 ..P WKT 2011 04 20 07 04 55 31.3200 -97.3300 251.000 30.0 189.684 3.490 -999.990 -999.990 1.897 ..P WKT 2011 04 20 07 09 55 31.3200 -97.3300 251.000 122.0 202.767 2.670 -999.990 -999.990 2.028 ..P WKT 2011 04 20 07 14 55 31.3200 -97.3300 251.000 457.0 208.746 2.920 -999.990 -999.990 2.087 ..P WKT 2011 04 20 07 24 55 31.3200 -97.3300 251.000 30.0 201.775 2.690 -999.990 -999.990 2.018 ..P WKT 2011 04 20 07 29 55 31.3200 -97.3300 251.000 122.0 212.285 3.150 -999.990 -999.990 2.123 ..P WKT 2011 04 20 07 34 55 31.3200 -97.3300 251.000 457.0 223.949 2.800 -999.990 -999.990 2.239 ..P WKT 2011 04 20 07 39 55 31.3200 -97.3300 251.000 30.0 203.072 2.840 -999.990 -999.990 2.031 ..P WKT 2011 04 20 07 44 55 31.3200 -97.3300 251.000 122.0 209.616 2.890 -999.990 -999.990 2.096 ..P WKT 2011 04 20 07 49 55 31.3200 -97.3300 251.000 457.0 238.789 4.320 -999.990 -999.990 2.388 ..P WKT 2011 04 20 07 59 55 31.3200 -97.3300 251.000 30.0 197.132 2.950 -999.990 -999.990 1.971 ..P WKT 2011 04 20 08 04 55 31.3200 -97.3300 251.000 122.0 212.854 3.670 -999.990 -999.990 2.129 ..P WKT 2011 04 20 08 09 55 31.3200 -97.3300 251.000 457.0 250.707 3.030 -999.990 -999.990 2.507 ..P WKT 2011 04 20 08 14 55 31.3200 -97.3300 251.000 30.0 204.988 3.350 -999.990 -999.990 2.050 ..P WKT 2011 04 20 08 19 55 31.3200 -97.3300 251.000 122.0 217.736 2.970 -999.990 -999.990 2.177 ..P WKT 2011 04 20 08 24 55 31.3200 -97.3300 251.000 457.0 250.466 3.020 -999.990 -999.990 2.505 ..P WKT 2011 04 20 08 34 55 31.3200 -97.3300 251.000 30.0 209.972 4.290 -999.990 -999.990 2.100 ..P WKT 2011 04 20 08 39 55 31.3200 -97.3300 251.000 122.0 227.083 3.200 -999.990 -999.990 2.271 ..P WKT 2011 04 20 08 44 55 31.3200 -97.3300 251.000 457.0 257.073 3.300 -999.990 -999.990 2.571 ..P WKT 2011 04 20 08 49 55 31.3200 -97.3300 251.000 30.0 213.910 3.220 -999.990 -999.990 2.139 ..P WKT 2011 04 20 08 54 55 31.3200 -97.3300 251.000 122.0 224.414 3.840 -999.990 -999.990 2.244 ..P WKT 2011 04 20 08 59 55 31.3200 -97.3300 251.000 457.0 241.852 3.230 -999.990 -999.990 2.419 ..P WKT 2011 04 20 09 09 55 31.3200 -97.3300 251.000 30.0 220.943 3.580 -999.990 -999.990 2.209 ..P WKT 2011 04 20 09 14 55 31.3200 -97.3300 251.000 122.0 233.122 2.840 -999.990 -999.990 2.331 ..P WKT 2011 04 20 09 19 55 31.3200 -97.3300 251.000 457.0 242.327 4.180 -999.990 -999.990 2.423 ..P WKT 2011 04 20 09 24 55 31.3200 -97.3300 251.000 30.0 222.144 4.240 -999.990 -999.990 2.221 ..P WKT 2011 04 20 09 29 55 31.3200 -97.3300 251.000 122.0 232.670 2.860 -999.990 -999.990 2.327 ..P WKT 2011 04 20 09 34 55 31.3200 -97.3300 251.000 457.0 246.168 3.010 -999.990 -999.990 2.462 ..P WKT 2011 04 20 09 44 55 31.3200 -97.3300 251.000 30.0 228.634 5.020 -999.990 -999.990 2.286 ..P WKT 2011 04 20 09 49 55 31.3200 -97.3300 251.000 122.0 240.197 3.340 -999.990 -999.990 2.402 ..P WKT 2011 04 20 09 54 55 31.3200 -97.3300 251.000 457.0 247.796 3.550 -999.990 -999.990 2.478 ..P WKT 2011 04 20 09 59 55 31.3200 -97.3300 251.000 30.0 231.955 3.090 -999.990 -999.990 2.320 ..P WKT 2011 04 20 10 04 55 31.3200 -97.3300 251.000 122.0 241.206 2.940 -999.990 -999.990 2.412 ..P WKT 2011 04 20 10 09 55 31.3200 -97.3300 251.000 457.0 240.552 3.780 -999.990 -999.990 2.406 ..P WKT 2011 04 20 10 19 55 31.3200 -97.3300 251.000 30.0 235.142 3.330 -999.990 -999.990 2.351 ..P WKT 2011 04 20 10 24 55 31.3200 -97.3300 251.000 122.0 240.619 2.980 -999.990 -999.990 2.406 ..P WKT 2011 04 20 10 29 55 31.3200 -97.3300 251.000 457.0 248.076 3.800 -999.990 -999.990 2.481 ..P WKT 2011 04 20 10 34 55 31.3200 -97.3300 251.000 30.0 245.630 3.280 -999.990 -999.990 2.456 ..P WKT 2011 04 20 10 39 55 31.3200 -97.3300 251.000 122.0 239.553 2.700 -999.990 -999.990 2.396 ..P WKT 2011 04 20 10 44 55 31.3200 -97.3300 251.000 457.0 251.961 3.020 -999.990 -999.990 2.520 ..P WKT 2011 04 20 10 54 55 31.3200 -97.3300 251.000 30.0 247.282 2.890 -999.990 -999.990 2.473 ..P WKT 2011 04 20 10 59 55 31.3200 -97.3300 251.000 122.0 243.233 3.480 -999.990 -999.990 2.432 ..P WKT 2011 04 20 11 04 55 31.3200 -97.3300 251.000 457.0 251.066 3.190 -999.990 -999.990 2.511 ..P WKT 2011 04 20 11 09 55 31.3200 -97.3300 251.000 30.0 248.998 3.500 -999.990 -999.990 2.490 ..P WKT 2011 04 20 11 14 55 31.3200 -97.3300 251.000 122.0 251.715 3.690 -999.990 -999.990 2.517 ..P WKT 2011 04 20 11 19 55 31.3200 -97.3300 251.000 457.0 253.442 4.590 -999.990 -999.990 2.534 ..P WKT 2011 04 20 11 29 55 31.3200 -97.3300 251.000 30.0 250.555 4.300 -999.990 -999.990 2.506 ..P WKT 2011 04 20 11 34 55 31.3200 -97.3300 251.000 122.0 243.136 4.170 -999.990 -999.990 2.431 ..P WKT 2011 04 20 11 39 55 31.3200 -97.3300 251.000 457.0 242.978 4.300 -999.990 -999.990 2.430 ..P WKT 2011 04 20 11 44 55 31.3200 -97.3300 251.000 30.0 245.624 4.390 -999.990 -999.990 2.456 ..P WKT 2011 04 20 11 49 55 31.3200 -97.3300 251.000 122.0 248.600 4.770 -999.990 -999.990 2.486 ..P WKT 2011 04 20 12 09 55 31.3200 -97.3300 251.000 457.0 234.975 2.950 -999.990 -999.990 2.350 ..P WKT 2011 04 20 12 10 25 31.3200 -97.3300 251.000 457.0 235.823 3.100 -999.990 -999.990 2.358 ..P WKT 2011 04 20 12 10 55 31.3200 -97.3300 251.000 457.0 234.855 3.540 -999.990 -999.990 2.349 ..P WKT 2011 04 20 12 11 25 31.3200 -97.3300 251.000 457.0 239.828 4.080 -999.990 -999.990 2.398 ..P WKT 2011 04 20 12 11 55 31.3200 -97.3300 251.000 457.0 233.416 2.980 -999.990 -999.990 2.334 ..P WKT 2011 04 20 12 12 25 31.3200 -97.3300 251.000 457.0 235.748 2.840 -999.990 -999.990 2.357 ..P WKT 2011 04 20 12 12 55 31.3200 -97.3300 251.000 457.0 238.080 4.420 -999.990 -999.990 2.381 ..P WKT 2011 04 20 12 13 25 31.3200 -97.3300 251.000 457.0 241.403 4.280 -999.990 -999.990 2.414 ..P WKT 2011 04 20 12 13 55 31.3200 -97.3300 251.000 457.0 234.496 2.800 -999.990 -999.990 2.345 ..P WKT 2011 04 20 12 14 25 31.3200 -97.3300 251.000 457.0 237.489 2.940 -999.990 -999.990 2.375 ..P WKT 2011 04 20 12 14 55 31.3200 -97.3300 251.000 457.0 233.220 3.370 -999.990 -999.990 2.332 ..P WKT 2011 04 20 12 19 55 31.3200 -97.3300 251.000 30.0 244.007 2.850 -999.990 -999.990 2.440 ..P WKT 2011 04 20 12 24 55 31.3200 -97.3300 251.000 122.0 235.983 3.130 -999.990 -999.990 2.360 ..P WKT 2011 04 20 12 29 55 31.3200 -97.3300 251.000 457.0 227.956 3.300 -999.990 -999.990 2.280 ..P WKT 2011 04 20 12 34 55 31.3200 -97.3300 251.000 30.0 230.162 2.610 -999.990 -999.990 2.302 ..P WKT 2011 04 20 12 39 55 31.3200 -97.3300 251.000 122.0 227.086 3.670 -999.990 -999.990 2.271 ..P WKT 2011 04 20 12 44 55 31.3200 -97.3300 251.000 457.0 228.302 2.490 -999.990 -999.990 2.283 ..P WKT 2011 04 20 12 54 55 31.3200 -97.3300 251.000 30.0 222.165 2.580 -999.990 -999.990 2.222 ..P WKT 2011 04 20 12 59 55 31.3200 -97.3300 251.000 122.0 230.660 3.320 -999.990 -999.990 2.307 ..P WKT 2011 04 20 13 04 55 31.3200 -97.3300 251.000 457.0 226.940 2.400 -999.990 -999.990 2.269 ..P WKT 2011 04 20 13 09 55 31.3200 -97.3300 251.000 30.0 228.501 2.380 -999.990 -999.990 2.285 ..P WKT 2011 04 20 13 14 55 31.3200 -97.3300 251.000 122.0 231.715 2.980 -999.990 -999.990 2.317 ..P WKT 2011 04 20 13 19 55 31.3200 -97.3300 251.000 457.0 227.663 3.460 -999.990 -999.990 2.277 ..P WKT 2011 04 20 13 29 55 31.3200 -97.3300 251.000 30.0 231.117 2.650 -999.990 -999.990 2.311 ..P WKT 2011 04 20 13 34 55 31.3200 -97.3300 251.000 122.0 222.770 2.480 -999.990 -999.990 2.228 ..P WKT 2011 04 20 13 39 55 31.3200 -97.3300 251.000 457.0 222.019 2.760 -999.990 -999.990 2.220 ..P WKT 2011 04 20 13 44 55 31.3200 -97.3300 251.000 30.0 221.930 3.140 -999.990 -999.990 2.219 ..P WKT 2011 04 20 13 49 55 31.3200 -97.3300 251.000 122.0 225.805 4.050 -999.990 -999.990 2.258 ..P WKT 2011 04 20 13 54 55 31.3200 -97.3300 251.000 457.0 217.125 3.210 -999.990 -999.990 2.171 ..P WKT 2011 04 20 14 04 55 31.3200 -97.3300 251.000 30.0 222.516 3.920 -999.990 -999.990 2.225 ..P WKT 2011 04 20 14 09 55 31.3200 -97.3300 251.000 122.0 225.354 3.390 -999.990 -999.990 2.254 ..P WKT 2011 04 20 14 14 55 31.3200 -97.3300 251.000 457.0 223.234 3.820 -999.990 -999.990 2.232 ..P WKT 2011 04 20 14 19 55 31.3200 -97.3300 251.000 30.0 225.412 3.900 -999.990 -999.990 2.254 ..P WKT 2011 04 20 14 24 55 31.3200 -97.3300 251.000 122.0 219.985 3.310 -999.990 -999.990 2.200 ..P WKT 2011 04 20 14 29 55 31.3200 -97.3300 251.000 457.0 213.568 4.570 -999.990 -999.990 2.136 ..P WKT 2011 04 20 14 39 55 31.3200 -97.3300 251.000 30.0 217.237 3.190 -999.990 -999.990 2.172 ..P WKT 2011 04 20 14 44 55 31.3200 -97.3300 251.000 122.0 223.359 3.540 -999.990 -999.990 2.234 ..P WKT 2011 04 20 14 49 55 31.3200 -97.3300 251.000 457.0 222.537 3.830 -999.990 -999.990 2.225 ..P WKT 2011 04 20 14 54 55 31.3200 -97.3300 251.000 30.0 225.848 3.370 -999.990 -999.990 2.258 ..P WKT 2011 04 20 14 59 55 31.3200 -97.3300 251.000 122.0 223.870 3.410 -999.990 -999.990 2.239 ..P WKT 2011 04 20 15 04 55 31.3200 -97.3300 251.000 457.0 225.032 3.110 -999.990 -999.990 2.250 ..P WKT 2011 04 20 15 14 55 31.3200 -97.3300 251.000 30.0 225.751 4.410 -999.990 -999.990 2.258 ..P WKT 2011 04 20 15 19 55 31.3200 -97.3300 251.000 122.0 226.796 3.400 -999.990 -999.990 2.268 ..P WKT 2011 04 20 15 24 55 31.3200 -97.3300 251.000 457.0 221.555 3.790 -999.990 -999.990 2.216 ..P WKT 2011 04 20 15 29 55 31.3200 -97.3300 251.000 30.0 221.442 4.330 -999.990 -999.990 2.214 ..P WKT 2011 04 20 15 34 55 31.3200 -97.3300 251.000 122.0 231.916 3.270 -999.990 -999.990 2.319 ..P WKT 2011 04 20 15 39 55 31.3200 -97.3300 251.000 457.0 228.991 3.260 -999.990 -999.990 2.290 ..P WKT 2011 04 20 15 49 55 31.3200 -97.3300 251.000 30.0 227.275 3.780 -999.990 -999.990 2.273 ..P WKT 2011 04 20 15 54 55 31.3200 -97.3300 251.000 122.0 240.400 4.600 -999.990 -999.990 2.404 ..P WKT 2011 04 20 15 59 55 31.3200 -97.3300 251.000 457.0 231.187 3.320 -999.990 -999.990 2.312 ..P WKT 2011 04 20 16 04 55 31.3200 -97.3300 251.000 30.0 240.011 3.410 -999.990 -999.990 2.400 ..P WKT 2011 04 20 16 09 55 31.3200 -97.3300 251.000 122.0 235.926 3.360 -999.990 -999.990 2.359 ..P WKT 2011 04 20 16 14 55 31.3200 -97.3300 251.000 457.0 240.283 3.080 -999.990 -999.990 2.403 ..P WKT 2011 04 20 16 24 55 31.3200 -97.3300 251.000 30.0 235.234 3.450 -999.990 -999.990 2.352 ..P WKT 2011 04 20 16 29 55 31.3200 -97.3300 251.000 122.0 242.051 3.580 -999.990 -999.990 2.421 ..P WKT 2011 04 20 16 34 55 31.3200 -97.3300 251.000 457.0 239.432 3.340 -999.990 -999.990 2.394 ..P WKT 2011 04 20 16 39 55 31.3200 -97.3300 251.000 30.0 235.654 3.500 -999.990 -999.990 2.357 ..P WKT 2011 04 20 16 44 55 31.3200 -97.3300 251.000 122.0 239.491 5.940 -999.990 -999.990 2.395 ..P WKT 2011 04 20 16 49 55 31.3200 -97.3300 251.000 457.0 238.693 4.620 -999.990 -999.990 2.387 ..P WKT 2011 04 20 17 04 55 31.3200 -97.3300 251.000 30.0 227.059 3.010 -999.990 -999.990 2.271 ..P WKT 2011 04 20 17 09 55 31.3200 -97.3300 251.000 122.0 227.188 3.030 -999.990 -999.990 2.272 ..P WKT 2011 04 20 17 14 55 31.3200 -97.3300 251.000 457.0 229.305 5.270 -999.990 -999.990 2.293 ..P WKT 2011 04 20 17 19 55 31.3200 -97.3300 251.000 30.0 227.115 2.830 -999.990 -999.990 2.271 ..P WKT 2011 04 20 17 24 55 31.3200 -97.3300 251.000 122.0 232.877 3.190 -999.990 -999.990 2.329 ..P WKT 2011 04 20 17 29 55 31.3200 -97.3300 251.000 457.0 230.356 3.870 -999.990 -999.990 2.304 ..P WKT 2011 04 20 17 39 55 31.3200 -97.3300 251.000 30.0 224.858 3.290 -999.990 -999.990 2.249 ..P WKT 2011 04 20 17 44 55 31.3200 -97.3300 251.000 122.0 231.822 3.600 -999.990 -999.990 2.318 ..P WKT 2011 04 20 17 49 55 31.3200 -97.3300 251.000 457.0 233.817 3.990 -999.990 -999.990 2.338 ..P WKT 2011 04 20 17 54 55 31.3200 -97.3300 251.000 30.0 224.873 4.410 -999.990 -999.990 2.249 ..P WKT 2011 04 20 17 59 55 31.3200 -97.3300 251.000 122.0 231.507 3.180 -999.990 -999.990 2.315 ..P WKT 2011 04 20 18 04 55 31.3200 -97.3300 251.000 457.0 229.856 3.710 -999.990 -999.990 2.299 ..P WKT 2011 04 20 18 14 55 31.3200 -97.3300 251.000 30.0 231.548 3.880 -999.990 -999.990 2.315 ..P WKT 2011 04 20 18 19 55 31.3200 -97.3300 251.000 122.0 238.539 4.410 -999.990 -999.990 2.385 ..P WKT 2011 04 20 18 24 55 31.3200 -97.3300 251.000 457.0 233.263 5.040 -999.990 -999.990 2.333 ..P WKT 2011 04 20 18 29 55 31.3200 -97.3300 251.000 30.0 231.966 4.440 -999.990 -999.990 2.320 ..P WKT 2011 04 20 18 34 55 31.3200 -97.3300 251.000 122.0 233.322 4.600 -999.990 -999.990 2.333 ..P WKT 2011 04 20 18 39 55 31.3200 -97.3300 251.000 457.0 234.181 3.750 -999.990 -999.990 2.342 ..P WKT 2011 04 20 18 49 55 31.3200 -97.3300 251.000 30.0 234.097 3.090 -999.990 -999.990 2.341 ..P WKT 2011 04 20 18 54 55 31.3200 -97.3300 251.000 122.0 236.140 3.830 -999.990 -999.990 2.361 ..P WKT 2011 04 20 18 59 55 31.3200 -97.3300 251.000 457.0 234.369 4.550 -999.990 -999.990 2.344 ..P WKT 2011 04 20 19 04 55 31.3200 -97.3300 251.000 30.0 238.071 4.400 -999.990 -999.990 2.381 ..P WKT 2011 04 20 19 09 55 31.3200 -97.3300 251.000 122.0 235.802 4.580 -999.990 -999.990 2.358 ..P WKT 2011 04 20 19 14 55 31.3200 -97.3300 251.000 457.0 231.873 3.930 -999.990 -999.990 2.319 ..P WKT 2011 04 20 19 24 55 31.3200 -97.3300 251.000 30.0 234.279 3.730 -999.990 -999.990 2.343 ..P WKT 2011 04 20 19 29 55 31.3200 -97.3300 251.000 122.0 234.308 3.720 -999.990 -999.990 2.343 ..P WKT 2011 04 20 19 34 55 31.3200 -97.3300 251.000 457.0 229.857 4.250 -999.990 -999.990 2.299 ..P WKT 2011 04 20 19 39 55 31.3200 -97.3300 251.000 30.0 227.397 4.120 -999.990 -999.990 2.274 ..P WKT 2011 04 20 19 44 55 31.3200 -97.3300 251.000 122.0 234.396 3.980 -999.990 -999.990 2.344 ..P WKT 2011 04 20 19 49 55 31.3200 -97.3300 251.000 457.0 229.612 3.830 -999.990 -999.990 2.296 ..P WKT 2011 04 20 19 59 55 31.3200 -97.3300 251.000 30.0 235.599 3.940 -999.990 -999.990 2.356 ..P WKT 2011 04 20 20 04 55 31.3200 -97.3300 251.000 122.0 236.742 4.040 -999.990 -999.990 2.367 ..P WKT 2011 04 20 20 09 55 31.3200 -97.3300 251.000 457.0 240.377 4.450 -999.990 -999.990 2.404 ..P WKT 2011 04 20 20 14 55 31.3200 -97.3300 251.000 30.0 226.247 4.450 -999.990 -999.990 2.262 ..P WKT 2011 04 20 20 19 55 31.3200 -97.3300 251.000 122.0 239.013 3.330 -999.990 -999.990 2.390 ..P WKT 2011 04 20 20 24 55 31.3200 -97.3300 251.000 457.0 234.013 4.220 -999.990 -999.990 2.340 ..P WKT 2011 04 20 20 34 55 31.3200 -97.3300 251.000 30.0 235.377 4.270 -999.990 -999.990 2.354 ..P WKT 2011 04 20 20 39 55 31.3200 -97.3300 251.000 122.0 242.904 3.750 -999.990 -999.990 2.429 ..P WKT 2011 04 20 20 44 55 31.3200 -97.3300 251.000 457.0 238.473 3.590 -999.990 -999.990 2.385 ..P WKT 2011 04 20 20 49 55 31.3200 -97.3300 251.000 30.0 237.862 3.680 -999.990 -999.990 2.379 ..P WKT 2011 04 20 20 54 55 31.3200 -97.3300 251.000 122.0 241.237 3.590 -999.990 -999.990 2.412 ..P WKT 2011 04 20 20 59 55 31.3200 -97.3300 251.000 457.0 243.616 4.120 -999.990 -999.990 2.436 ..P WKT 2011 04 20 21 09 55 31.3200 -97.3300 251.000 30.0 239.878 3.430 -999.990 -999.990 2.399 ..P WKT 2011 04 20 21 14 55 31.3200 -97.3300 251.000 122.0 247.052 3.550 -999.990 -999.990 2.471 ..P WKT 2011 04 20 21 19 55 31.3200 -97.3300 251.000 457.0 241.932 4.920 -999.990 -999.990 2.419 ..P WKT 2011 04 20 21 24 55 31.3200 -97.3300 251.000 30.0 238.140 3.510 -999.990 -999.990 2.381 ..P WKT 2011 04 20 21 29 55 31.3200 -97.3300 251.000 122.0 240.662 3.300 -999.990 -999.990 2.407 ..P WKT 2011 04 20 21 34 55 31.3200 -97.3300 251.000 457.0 228.560 3.360 -999.990 -999.990 2.286 ..P WKT 2011 04 20 21 44 55 31.3200 -97.3300 251.000 30.0 228.808 2.840 -999.990 -999.990 2.288 ..P WKT 2011 04 20 21 49 55 31.3200 -97.3300 251.000 122.0 239.166 2.930 -999.990 -999.990 2.392 ..P WKT 2011 04 20 21 54 55 31.3200 -97.3300 251.000 457.0 227.917 3.730 -999.990 -999.990 2.279 ..P WKT 2011 04 20 21 59 55 31.3200 -97.3300 251.000 30.0 224.645 3.510 -999.990 -999.990 2.246 ..P WKT 2011 04 20 22 04 55 31.3200 -97.3300 251.000 122.0 225.362 3.150 -999.990 -999.990 2.254 ..P WKT 2011 04 20 22 09 55 31.3200 -97.3300 251.000 457.0 220.760 2.930 -999.990 -999.990 2.208 ..P WKT 2011 04 20 22 19 55 31.3200 -97.3300 251.000 30.0 220.579 3.500 -999.990 -999.990 2.206 ..P WKT 2011 04 20 22 24 55 31.3200 -97.3300 251.000 122.0 226.998 4.920 -999.990 -999.990 2.270 ..P WKT 2011 04 20 22 29 55 31.3200 -97.3300 251.000 457.0 223.772 3.670 -999.990 -999.990 2.238 ..P WKT 2011 04 20 22 34 55 31.3200 -97.3300 251.000 30.0 220.213 5.420 -999.990 -999.990 2.202 ..P WKT 2011 04 20 22 39 55 31.3200 -97.3300 251.000 122.0 221.810 4.140 -999.990 -999.990 2.218 ..P WKT 2011 04 20 22 44 55 31.3200 -97.3300 251.000 457.0 223.573 4.010 -999.990 -999.990 2.236 ..P WKT 2011 04 20 22 54 55 31.3200 -97.3300 251.000 30.0 221.706 4.190 -999.990 -999.990 2.217 ..P WKT 2011 04 20 22 59 55 31.3200 -97.3300 251.000 122.0 223.232 4.540 -999.990 -999.990 2.232 ..P WKT 2011 04 20 23 04 55 31.3200 -97.3300 251.000 457.0 217.104 4.790 -999.990 -999.990 2.171 ..P WKT 2011 04 20 23 09 55 31.3200 -97.3300 251.000 30.0 221.958 5.670 -999.990 -999.990 2.220 ..P WKT 2011 04 20 23 14 55 31.3200 -97.3300 251.000 122.0 224.981 3.760 -999.990 -999.990 2.250 ..P WKT 2011 04 20 23 19 55 31.3200 -97.3300 251.000 457.0 218.520 3.290 -999.990 -999.990 2.185 ..P WKT 2011 04 20 23 29 55 31.3200 -97.3300 251.000 30.0 211.231 5.220 -999.990 -999.990 2.112 ..P WKT 2011 04 20 23 34 55 31.3200 -97.3300 251.000 122.0 215.729 3.950 -999.990 -999.990 2.157 ..P WKT 2011 04 20 23 39 55 31.3200 -97.3300 251.000 457.0 219.062 3.360 -999.990 -999.990 2.191 ..P WKT 2011 04 20 23 44 55 31.3200 -97.3300 251.000 30.0 215.405 3.590 -999.990 -999.990 2.154 ..P WKT 2011 04 20 23 49 55 31.3200 -97.3300 251.000 122.0 216.075 3.310 -999.990 -999.990 2.161 ..P WKT 2011 04 21 00 09 55 31.3200 -97.3300 251.000 457.0 222.114 3.630 -999.990 -999.990 2.221 ..P WKT 2011 04 21 00 10 25 31.3200 -97.3300 251.000 457.0 223.434 4.080 -999.990 -999.990 2.234 ..P WKT 2011 04 21 00 10 55 31.3200 -97.3300 251.000 457.0 225.253 3.560 -999.990 -999.990 2.253 ..P WKT 2011 04 21 00 11 25 31.3200 -97.3300 251.000 457.0 222.243 3.340 -999.990 -999.990 2.222 ..P WKT 2011 04 21 00 11 55 31.3200 -97.3300 251.000 457.0 225.395 5.130 -999.990 -999.990 2.254 ..P WKT 2011 04 21 00 12 25 31.3200 -97.3300 251.000 457.0 225.215 4.680 -999.990 -999.990 2.252 ..P WKT 2011 04 21 00 12 55 31.3200 -97.3300 251.000 457.0 224.203 3.340 -999.990 -999.990 2.242 ..P WKT 2011 04 21 00 13 25 31.3200 -97.3300 251.000 457.0 220.693 3.500 -999.990 -999.990 2.207 ..P WKT 2011 04 21 00 13 55 31.3200 -97.3300 251.000 457.0 220.181 3.820 -999.990 -999.990 2.202 ..P WKT 2011 04 21 00 14 25 31.3200 -97.3300 251.000 457.0 225.832 3.510 -999.990 -999.990 2.258 ..P WKT 2011 04 21 00 14 55 31.3200 -97.3300 251.000 457.0 223.154 3.420 -999.990 -999.990 2.232 ..P WKT 2011 04 21 00 19 55 31.3200 -97.3300 251.000 30.0 243.684 3.400 -999.990 -999.990 2.437 ..P WKT 2011 04 21 00 24 55 31.3200 -97.3300 251.000 122.0 241.561 4.190 -999.990 -999.990 2.416 ..P WKT 2011 04 21 00 29 55 31.3200 -97.3300 251.000 457.0 223.777 4.240 -999.990 -999.990 2.238 ..P WKT 2011 04 21 00 34 55 31.3200 -97.3300 251.000 30.0 244.481 4.470 -999.990 -999.990 2.445 ..P WKT 2011 04 21 00 39 55 31.3200 -97.3300 251.000 122.0 240.858 3.930 -999.990 -999.990 2.409 ..P WKT 2011 04 21 00 44 55 31.3200 -97.3300 251.000 457.0 225.067 5.400 -999.990 -999.990 2.251 ..P WKT 2011 04 21 00 54 55 31.3200 -97.3300 251.000 30.0 254.763 3.720 -999.990 -999.990 2.548 ..P WKT 2011 04 21 00 59 55 31.3200 -97.3300 251.000 122.0 270.921 4.270 -999.990 -999.990 2.709 ..P WKT 2011 04 21 01 04 55 31.3200 -97.3300 251.000 457.0 230.053 4.340 -999.990 -999.990 2.301 ..P WKT 2011 04 21 01 09 55 31.3200 -97.3300 251.000 30.0 276.564 5.410 -999.990 -999.990 2.766 ..P WKT 2011 04 21 01 14 55 31.3200 -97.3300 251.000 122.0 279.052 4.660 -999.990 -999.990 2.791 ..P WKT 2011 04 21 01 19 55 31.3200 -97.3300 251.000 457.0 232.164 3.660 -999.990 -999.990 2.322 ..P WKT 2011 04 21 01 29 55 31.3200 -97.3300 251.000 30.0 287.522 4.110 -999.990 -999.990 2.875 ..P WKT 2011 04 21 01 34 55 31.3200 -97.3300 251.000 122.0 282.671 4.970 -999.990 -999.990 2.827 ..P WKT 2011 04 21 01 39 55 31.3200 -97.3300 251.000 457.0 215.400 5.160 -999.990 -999.990 2.154 ..P WKT 2011 04 21 01 44 55 31.3200 -97.3300 251.000 30.0 286.317 4.800 -999.990 -999.990 2.863 ..P WKT 2011 04 21 01 49 55 31.3200 -97.3300 251.000 122.0 286.806 3.720 -999.990 -999.990 2.868 ..P WKT 2011 04 21 01 54 55 31.3200 -97.3300 251.000 457.0 210.830 3.410 -999.990 -999.990 2.108 ..P WKT 2011 04 21 02 04 55 31.3200 -97.3300 251.000 30.0 287.318 4.020 -999.990 -999.990 2.873 ..P WKT 2011 04 21 02 09 55 31.3200 -97.3300 251.000 122.0 283.846 5.460 -999.990 -999.990 2.838 ..P WKT 2011 04 21 02 14 55 31.3200 -97.3300 251.000 457.0 215.229 3.750 -999.990 -999.990 2.152 ..P WKT 2011 04 21 02 19 55 31.3200 -97.3300 251.000 30.0 284.250 5.040 -999.990 -999.990 2.843 ..P WKT 2011 04 21 02 24 55 31.3200 -97.3300 251.000 122.0 287.459 4.470 -999.990 -999.990 2.875 ..P WKT 2011 04 21 02 29 55 31.3200 -97.3300 251.000 457.0 205.117 3.430 -999.990 -999.990 2.051 ..P WKT 2011 04 21 02 39 55 31.3200 -97.3300 251.000 30.0 291.076 4.530 -999.990 -999.990 2.911 ..P WKT 2011 04 21 02 44 55 31.3200 -97.3300 251.000 122.0 293.953 4.630 -999.990 -999.990 2.940 ..P WKT 2011 04 21 02 49 55 31.3200 -97.3300 251.000 457.0 206.891 4.150 -999.990 -999.990 2.069 ..P WKT 2011 04 21 02 54 55 31.3200 -97.3300 251.000 30.0 291.853 4.270 -999.990 -999.990 2.919 ..P WKT 2011 04 21 02 59 55 31.3200 -97.3300 251.000 122.0 294.230 5.850 -999.990 -999.990 2.942 ..P WKT 2011 04 21 03 04 55 31.3200 -97.3300 251.000 457.0 206.634 4.490 -999.990 -999.990 2.066 ..P WKT 2011 04 21 03 14 55 31.3200 -97.3300 251.000 30.0 290.515 4.780 -999.990 -999.990 2.905 ..P WKT 2011 04 21 03 19 55 31.3200 -97.3300 251.000 122.0 292.415 5.200 -999.990 -999.990 2.924 ..P WKT 2011 04 21 03 24 55 31.3200 -97.3300 251.000 457.0 212.999 4.560 -999.990 -999.990 2.130 ..P WKT 2011 04 21 03 29 55 31.3200 -97.3300 251.000 30.0 285.841 5.340 -999.990 -999.990 2.858 ..P WKT 2011 04 21 03 34 55 31.3200 -97.3300 251.000 122.0 288.746 5.230 -999.990 -999.990 2.887 ..P WKT 2011 04 21 03 39 55 31.3200 -97.3300 251.000 457.0 208.967 5.060 -999.990 -999.990 2.090 ..P WKT 2011 04 21 03 49 55 31.3200 -97.3300 251.000 30.0 296.100 5.250 -999.990 -999.990 2.961 ..P WKT 2011 04 21 03 54 55 31.3200 -97.3300 251.000 122.0 275.374 4.750 -999.990 -999.990 2.754 ..P WKT 2011 04 21 03 59 55 31.3200 -97.3300 251.000 457.0 217.134 4.330 -999.990 -999.990 2.171 ..P WKT 2011 04 21 04 04 55 31.3200 -97.3300 251.000 30.0 288.505 4.370 -999.990 -999.990 2.885 ..P WKT 2011 04 21 04 09 55 31.3200 -97.3300 251.000 122.0 277.989 4.150 -999.990 -999.990 2.780 ..P WKT 2011 04 21 04 14 55 31.3200 -97.3300 251.000 457.0 221.402 4.060 -999.990 -999.990 2.214 ..P WKT 2011 04 21 04 24 55 31.3200 -97.3300 251.000 30.0 270.671 4.680 -999.990 -999.990 2.707 ..P WKT 2011 04 21 04 29 55 31.3200 -97.3300 251.000 122.0 258.759 4.620 -999.990 -999.990 2.588 ..P WKT 2011 04 21 04 34 55 31.3200 -97.3300 251.000 457.0 226.899 4.130 -999.990 -999.990 2.269 ..P WKT 2011 04 21 04 39 55 31.3200 -97.3300 251.000 30.0 254.871 4.310 -999.990 -999.990 2.549 ..P WKT 2011 04 21 04 44 55 31.3200 -97.3300 251.000 122.0 267.763 4.550 -999.990 -999.990 2.678 ..P WKT 2011 04 21 04 49 55 31.3200 -97.3300 251.000 457.0 239.414 4.610 -999.990 -999.990 2.394 ..P WKT 2011 04 21 05 04 55 31.3200 -97.3300 251.000 30.0 259.198 5.170 -999.990 -999.990 2.592 ..P WKT 2011 04 21 05 09 55 31.3200 -97.3300 251.000 122.0 278.580 5.030 -999.990 -999.990 2.786 ..P WKT 2011 04 21 05 14 55 31.3200 -97.3300 251.000 457.0 227.508 5.540 -999.990 -999.990 2.275 ..P WKT 2011 04 21 05 19 55 31.3200 -97.3300 251.000 30.0 254.944 4.750 -999.990 -999.990 2.549 ..P WKT 2011 04 21 05 24 55 31.3200 -97.3300 251.000 122.0 249.162 4.390 -999.990 -999.990 2.492 ..P WKT 2011 04 21 05 29 55 31.3200 -97.3300 251.000 457.0 209.481 4.190 -999.990 -999.990 2.095 ..P WKT 2011 04 21 05 39 55 31.3200 -97.3300 251.000 30.0 245.514 4.910 -999.990 -999.990 2.455 ..P WKT 2011 04 21 05 44 55 31.3200 -97.3300 251.000 122.0 247.055 5.030 -999.990 -999.990 2.471 ..P WKT 2011 04 21 05 49 55 31.3200 -97.3300 251.000 457.0 198.900 4.970 -999.990 -999.990 1.989 ..P WKT 2011 04 21 05 54 55 31.3200 -97.3300 251.000 30.0 253.497 5.110 -999.990 -999.990 2.535 ..P WKT 2011 04 21 05 59 55 31.3200 -97.3300 251.000 122.0 224.475 4.080 -999.990 -999.990 2.245 ..P WKT 2011 04 21 06 04 55 31.3200 -97.3300 251.000 457.0 206.868 3.840 -999.990 -999.990 2.069 ..P WKT 2011 04 21 06 14 55 31.3200 -97.3300 251.000 30.0 237.351 5.290 -999.990 -999.990 2.374 ..P WKT 2011 04 21 06 19 55 31.3200 -97.3300 251.000 122.0 222.955 4.010 -999.990 -999.990 2.230 ..P WKT 2011 04 21 06 24 55 31.3200 -97.3300 251.000 457.0 201.162 3.940 -999.990 -999.990 2.012 ..P WKT 2011 04 21 06 29 55 31.3200 -97.3300 251.000 30.0 218.016 5.100 -999.990 -999.990 2.180 ..P WKT 2011 04 21 06 34 55 31.3200 -97.3300 251.000 122.0 216.891 4.970 -999.990 -999.990 2.169 ..P WKT 2011 04 21 06 39 55 31.3200 -97.3300 251.000 457.0 198.620 5.260 -999.990 -999.990 1.986 ..P WKT 2011 04 21 06 49 55 31.3200 -97.3300 251.000 30.0 211.328 4.280 -999.990 -999.990 2.113 ..P WKT 2011 04 21 06 54 55 31.3200 -97.3300 251.000 122.0 211.378 5.610 -999.990 -999.990 2.114 ..P WKT 2011 04 21 06 59 55 31.3200 -97.3300 251.000 457.0 197.975 4.640 -999.990 -999.990 1.980 ..P WKT 2011 04 21 07 04 55 31.3200 -97.3300 251.000 30.0 216.188 4.590 -999.990 -999.990 2.162 ..P WKT 2011 04 21 07 09 55 31.3200 -97.3300 251.000 122.0 211.361 4.850 -999.990 -999.990 2.114 ..P WKT 2011 04 21 07 14 55 31.3200 -97.3300 251.000 457.0 206.869 5.980 -999.990 -999.990 2.069 ..P WKT 2011 04 21 07 24 55 31.3200 -97.3300 251.000 30.0 209.949 4.890 -999.990 -999.990 2.099 ..P WKT 2011 04 21 07 29 55 31.3200 -97.3300 251.000 122.0 211.635 5.080 -999.990 -999.990 2.116 ..P WKT 2011 04 21 07 34 55 31.3200 -97.3300 251.000 457.0 187.063 5.250 -999.990 -999.990 1.871 ..P WKT 2011 04 21 07 39 55 31.3200 -97.3300 251.000 30.0 207.094 4.570 -999.990 -999.990 2.071 ..P WKT 2011 04 21 07 44 55 31.3200 -97.3300 251.000 122.0 206.759 4.160 -999.990 -999.990 2.068 ..P WKT 2011 04 21 07 49 55 31.3200 -97.3300 251.000 457.0 188.071 4.330 -999.990 -999.990 1.881 ..P WKT 2011 04 21 07 59 55 31.3200 -97.3300 251.000 30.0 205.946 4.060 -999.990 -999.990 2.059 ..P WKT 2011 04 21 08 04 55 31.3200 -97.3300 251.000 122.0 198.560 4.560 -999.990 -999.990 1.986 ..P WKT 2011 04 21 08 09 55 31.3200 -97.3300 251.000 457.0 203.471 4.770 -999.990 -999.990 2.035 ..P WKT 2011 04 21 08 14 55 31.3200 -97.3300 251.000 30.0 205.686 4.230 -999.990 -999.990 2.057 ..P WKT 2011 04 21 08 19 55 31.3200 -97.3300 251.000 122.0 203.522 4.630 -999.990 -999.990 2.035 ..P WKT 2011 04 21 08 24 55 31.3200 -97.3300 251.000 457.0 211.129 4.200 -999.990 -999.990 2.111 ..P WKT 2011 04 21 08 34 55 31.3200 -97.3300 251.000 30.0 203.308 4.810 -999.990 -999.990 2.033 ..P WKT 2011 04 21 08 39 55 31.3200 -97.3300 251.000 122.0 198.156 4.710 -999.990 -999.990 1.982 ..P WKT 2011 04 21 08 44 55 31.3200 -97.3300 251.000 457.0 198.735 5.440 -999.990 -999.990 1.987 ..P WKT 2011 04 21 08 49 55 31.3200 -97.3300 251.000 30.0 201.674 4.560 -999.990 -999.990 2.017 ..P WKT 2011 04 21 08 54 55 31.3200 -97.3300 251.000 122.0 219.791 4.480 -999.990 -999.990 2.198 ..P WKT 2011 04 21 08 59 55 31.3200 -97.3300 251.000 457.0 199.123 4.360 -999.990 -999.990 1.991 ..P WKT 2011 04 21 09 09 55 31.3200 -97.3300 251.000 30.0 205.631 5.600 -999.990 -999.990 2.056 ..P WKT 2011 04 21 09 14 55 31.3200 -97.3300 251.000 122.0 222.020 7.070 -999.990 -999.990 2.220 ..P WKT 2011 04 21 09 19 55 31.3200 -97.3300 251.000 457.0 205.344 5.060 -999.990 -999.990 2.053 ..P WKT 2011 04 21 09 24 55 31.3200 -97.3300 251.000 30.0 203.176 4.880 -999.990 -999.990 2.032 ..P WKT 2011 04 21 09 29 55 31.3200 -97.3300 251.000 122.0 208.095 4.930 -999.990 -999.990 2.081 ..P WKT 2011 04 21 09 34 55 31.3200 -97.3300 251.000 457.0 197.825 5.240 -999.990 -999.990 1.978 ..P WKT 2011 04 21 09 44 55 31.3200 -97.3300 251.000 30.0 209.355 5.510 -999.990 -999.990 2.094 ..P WKT 2011 04 21 09 49 55 31.3200 -97.3300 251.000 122.0 216.641 5.460 -999.990 -999.990 2.166 ..P WKT 2011 04 21 09 54 55 31.3200 -97.3300 251.000 457.0 206.368 4.920 -999.990 -999.990 2.064 ..P WKT 2011 04 21 09 59 55 31.3200 -97.3300 251.000 30.0 207.237 5.270 -999.990 -999.990 2.072 ..P WKT 2011 04 21 10 04 55 31.3200 -97.3300 251.000 122.0 215.202 5.030 -999.990 -999.990 2.152 ..P WKT 2011 04 21 10 09 55 31.3200 -97.3300 251.000 457.0 208.303 4.810 -999.990 -999.990 2.083 ..P WKT 2011 04 21 10 19 55 31.3200 -97.3300 251.000 30.0 218.179 4.840 -999.990 -999.990 2.182 ..P WKT 2011 04 21 10 24 55 31.3200 -97.3300 251.000 122.0 215.019 5.170 -999.990 -999.990 2.150 ..P WKT 2011 04 21 10 29 55 31.3200 -97.3300 251.000 457.0 213.548 5.790 -999.990 -999.990 2.135 ..P WKT 2011 04 21 10 34 55 31.3200 -97.3300 251.000 30.0 209.373 5.900 -999.990 -999.990 2.094 ..P WKT 2011 04 21 10 39 55 31.3200 -97.3300 251.000 122.0 216.693 6.070 -999.990 -999.990 2.167 ..P WKT 2011 04 21 10 44 55 31.3200 -97.3300 251.000 457.0 230.775 5.540 -999.990 -999.990 2.308 ..P WKT 2011 04 21 10 54 55 31.3200 -97.3300 251.000 30.0 211.314 5.740 -999.990 -999.990 2.113 ..P WKT 2011 04 21 10 59 55 31.3200 -97.3300 251.000 122.0 206.677 4.950 -999.990 -999.990 2.067 ..P WKT 2011 04 21 11 04 55 31.3200 -97.3300 251.000 457.0 230.623 5.220 -999.990 -999.990 2.306 ..P WKT 2011 04 21 11 09 55 31.3200 -97.3300 251.000 30.0 211.440 5.730 -999.990 -999.990 2.114 ..P WKT 2011 04 21 11 14 55 31.3200 -97.3300 251.000 122.0 219.152 5.150 -999.990 -999.990 2.192 ..P WKT 2011 04 21 11 19 55 31.3200 -97.3300 251.000 457.0 231.095 5.740 -999.990 -999.990 2.311 ..P WKT 2011 04 21 11 29 55 31.3200 -97.3300 251.000 30.0 212.521 5.560 -999.990 -999.990 2.125 ..P WKT 2011 04 21 11 34 55 31.3200 -97.3300 251.000 122.0 206.874 5.580 -999.990 -999.990 2.069 ..P WKT 2011 04 21 11 39 55 31.3200 -97.3300 251.000 457.0 232.203 5.640 -999.990 -999.990 2.322 ..P WKT 2011 04 21 11 44 55 31.3200 -97.3300 251.000 30.0 210.137 5.400 -999.990 -999.990 2.101 ..P WKT 2011 04 21 11 49 55 31.3200 -97.3300 251.000 122.0 215.663 5.780 -999.990 -999.990 2.157 ..P WKT 2011 04 21 12 09 55 31.3200 -97.3300 251.000 457.0 228.760 5.770 -999.990 -999.990 2.288 ..P WKT 2011 04 21 12 10 25 31.3200 -97.3300 251.000 457.0 228.951 6.300 -999.990 -999.990 2.290 ..P WKT 2011 04 21 12 10 55 31.3200 -97.3300 251.000 457.0 228.972 6.260 -999.990 -999.990 2.290 ..P WKT 2011 04 21 12 11 25 31.3200 -97.3300 251.000 457.0 234.241 5.770 -999.990 -999.990 2.342 ..P WKT 2011 04 21 12 11 55 31.3200 -97.3300 251.000 457.0 234.601 5.700 -999.990 -999.990 2.346 ..P WKT 2011 04 21 12 12 25 31.3200 -97.3300 251.000 457.0 232.421 5.690 -999.990 -999.990 2.324 ..P WKT 2011 04 21 12 12 55 31.3200 -97.3300 251.000 457.0 234.982 6.470 -999.990 -999.990 2.350 ..P WKT 2011 04 21 12 13 25 31.3200 -97.3300 251.000 457.0 237.542 6.480 -999.990 -999.990 2.375 ..P WKT 2011 04 21 12 13 55 31.3200 -97.3300 251.000 457.0 232.146 5.580 -999.990 -999.990 2.321 ..P WKT 2011 04 21 12 14 25 31.3200 -97.3300 251.000 457.0 231.659 5.580 -999.990 -999.990 2.317 ..P WKT 2011 04 21 12 14 55 31.3200 -97.3300 251.000 457.0 233.204 6.570 -999.990 -999.990 2.332 ..P WKT 2011 04 21 12 19 55 31.3200 -97.3300 251.000 30.0 217.502 5.710 -999.990 -999.990 2.175 ..P WKT 2011 04 21 12 24 55 31.3200 -97.3300 251.000 122.0 217.883 5.660 -999.990 -999.990 2.179 ..P WKT 2011 04 21 12 29 55 31.3200 -97.3300 251.000 457.0 228.758 5.230 -999.990 -999.990 2.288 ..P WKT 2011 04 21 12 34 55 31.3200 -97.3300 251.000 30.0 223.214 5.090 -999.990 -999.990 2.232 ..P WKT 2011 04 21 12 39 55 31.3200 -97.3300 251.000 122.0 221.057 5.720 -999.990 -999.990 2.211 ..P WKT 2011 04 21 12 44 55 31.3200 -97.3300 251.000 457.0 227.360 4.900 -999.990 -999.990 2.274 ..P WKT 2011 04 21 12 54 55 31.3200 -97.3300 251.000 30.0 222.161 4.850 -999.990 -999.990 2.222 ..P WKT 2011 04 21 12 59 55 31.3200 -97.3300 251.000 122.0 218.106 4.910 -999.990 -999.990 2.181 ..P WKT 2011 04 21 13 04 55 31.3200 -97.3300 251.000 457.0 218.449 5.310 -999.990 -999.990 2.184 ..P WKT 2011 04 21 13 09 55 31.3200 -97.3300 251.000 30.0 227.586 5.730 -999.990 -999.990 2.276 ..P WKT 2011 04 21 13 14 55 31.3200 -97.3300 251.000 122.0 224.884 4.900 -999.990 -999.990 2.249 ..P WKT 2011 04 21 13 19 55 31.3200 -97.3300 251.000 457.0 231.653 6.580 -999.990 -999.990 2.317 ..P WKT 2011 04 21 13 29 55 31.3200 -97.3300 251.000 30.0 215.912 4.720 -999.990 -999.990 2.159 ..P WKT 2011 04 21 13 34 55 31.3200 -97.3300 251.000 122.0 216.738 5.130 -999.990 -999.990 2.167 ..P WKT 2011 04 21 13 39 55 31.3200 -97.3300 251.000 457.0 249.343 5.090 -999.990 -999.990 2.493 ..P WKT 2011 04 21 13 44 55 31.3200 -97.3300 251.000 30.0 218.390 4.630 -999.990 -999.990 2.184 ..P WKT 2011 04 21 13 49 55 31.3200 -97.3300 251.000 122.0 220.567 4.730 -999.990 -999.990 2.206 ..P WKT 2011 04 21 13 54 55 31.3200 -97.3300 251.000 457.0 311.635 5.890 -999.990 -999.990 3.116 ..P WKT 2011 04 21 14 04 55 31.3200 -97.3300 251.000 30.0 218.216 5.270 -999.990 -999.990 2.182 ..P WKT 2011 04 21 14 09 55 31.3200 -97.3300 251.000 122.0 222.661 4.820 -999.990 -999.990 2.227 ..P WKT 2011 04 21 14 14 55 31.3200 -97.3300 251.000 457.0 209.199 4.700 -999.990 -999.990 2.092 ..P WKT 2011 04 21 14 19 55 31.3200 -97.3300 251.000 30.0 223.104 4.990 -999.990 -999.990 2.231 ..P WKT 2011 04 21 14 24 55 31.3200 -97.3300 251.000 122.0 219.948 4.900 -999.990 -999.990 2.199 ..P WKT 2011 04 21 14 29 55 31.3200 -97.3300 251.000 457.0 222.027 4.840 -999.990 -999.990 2.220 ..P WKT 2011 04 21 14 39 55 31.3200 -97.3300 251.000 30.0 216.561 5.030 -999.990 -999.990 2.166 ..P WKT 2011 04 21 14 44 55 31.3200 -97.3300 251.000 122.0 228.602 4.790 -999.990 -999.990 2.286 ..P WKT 2011 04 21 14 49 55 31.3200 -97.3300 251.000 457.0 226.965 5.140 -999.990 -999.990 2.270 ..P WKT 2011 04 21 14 54 55 31.3200 -97.3300 251.000 30.0 214.018 5.950 -999.990 -999.990 2.140 ..P WKT 2011 04 21 14 59 55 31.3200 -97.3300 251.000 122.0 227.407 5.840 -999.990 -999.990 2.274 ..P WKT 2011 04 21 15 04 55 31.3200 -97.3300 251.000 457.0 274.043 5.410 -999.990 -999.990 2.740 ..P WKT 2011 04 21 15 14 55 31.3200 -97.3300 251.000 30.0 224.622 4.690 -999.990 -999.990 2.246 ..P WKT 2011 04 21 15 19 55 31.3200 -97.3300 251.000 122.0 226.965 5.340 -999.990 -999.990 2.270 ..P WKT 2011 04 21 15 24 55 31.3200 -97.3300 251.000 457.0 236.055 5.380 -999.990 -999.990 2.361 ..P WKT 2011 04 21 15 29 55 31.3200 -97.3300 251.000 30.0 219.670 5.270 -999.990 -999.990 2.197 ..P WKT 2011 04 21 15 34 55 31.3200 -97.3300 251.000 122.0 232.471 4.660 -999.990 -999.990 2.325 ..P WKT 2011 04 21 15 39 55 31.3200 -97.3300 251.000 457.0 260.787 5.570 -999.990 -999.990 2.608 ..P WKT 2011 04 21 15 49 55 31.3200 -97.3300 251.000 30.0 234.455 4.350 -999.990 -999.990 2.345 ..P WKT 2011 04 21 15 54 55 31.3200 -97.3300 251.000 122.0 235.976 5.110 -999.990 -999.990 2.360 ..P WKT 2011 04 21 15 59 55 31.3200 -97.3300 251.000 457.0 257.899 5.360 -999.990 -999.990 2.579 ..P WKT 2011 04 21 16 04 55 31.3200 -97.3300 251.000 30.0 242.726 4.540 -999.990 -999.990 2.427 ..P WKT 2011 04 21 16 09 55 31.3200 -97.3300 251.000 122.0 243.066 4.460 -999.990 -999.990 2.431 ..P WKT 2011 04 21 16 14 55 31.3200 -97.3300 251.000 457.0 279.647 4.360 -999.990 -999.990 2.796 ..P WKT 2011 04 21 16 24 55 31.3200 -97.3300 251.000 30.0 227.447 4.090 -999.990 -999.990 2.274 ..P WKT 2011 04 21 16 29 55 31.3200 -97.3300 251.000 122.0 232.723 4.230 -999.990 -999.990 2.327 ..P WKT 2011 04 21 16 34 55 31.3200 -97.3300 251.000 457.0 255.522 4.590 -999.990 -999.990 2.555 ..P WKT 2011 04 21 16 39 55 31.3200 -97.3300 251.000 30.0 221.368 4.340 -999.990 -999.990 2.214 ..P WKT 2011 04 21 16 44 55 31.3200 -97.3300 251.000 122.0 238.100 5.440 -999.990 -999.990 2.381 ..P WKT 2011 04 21 16 49 55 31.3200 -97.3300 251.000 457.0 260.218 5.060 -999.990 -999.990 2.602 ..P WKT 2011 04 21 17 04 55 31.3200 -97.3300 251.000 30.0 258.079 5.200 -999.990 -999.990 2.581 ..P WKT 2011 04 21 17 09 55 31.3200 -97.3300 251.000 122.0 268.858 5.000 -999.990 -999.990 2.689 ..P WKT 2011 04 21 17 14 55 31.3200 -97.3300 251.000 457.0 261.449 4.830 -999.990 -999.990 2.614 ..P WKT 2011 04 21 17 19 55 31.3200 -97.3300 251.000 30.0 257.745 4.750 -999.990 -999.990 2.577 ..P WKT 2011 04 21 17 24 55 31.3200 -97.3300 251.000 122.0 264.143 6.360 -999.990 -999.990 2.641 ..P WKT 2011 04 21 17 29 55 31.3200 -97.3300 251.000 457.0 258.083 5.060 -999.990 -999.990 2.581 ..P WKT 2011 04 21 17 39 55 31.3200 -97.3300 251.000 30.0 245.438 4.820 -999.990 -999.990 2.454 ..P WKT 2011 04 21 17 44 55 31.3200 -97.3300 251.000 122.0 254.672 4.880 -999.990 -999.990 2.547 ..P WKT 2011 04 21 17 49 55 31.3200 -97.3300 251.000 457.0 238.663 5.000 -999.990 -999.990 2.387 ..P WKT 2011 04 21 17 54 55 31.3200 -97.3300 251.000 30.0 236.455 4.780 -999.990 -999.990 2.365 ..P WKT 2011 04 21 17 59 55 31.3200 -97.3300 251.000 122.0 245.014 5.020 -999.990 -999.990 2.450 ..P WKT 2011 04 21 18 04 55 31.3200 -97.3300 251.000 457.0 248.861 4.920 -999.990 -999.990 2.489 ..P WKT 2011 04 21 18 14 55 31.3200 -97.3300 251.000 30.0 243.865 4.500 -999.990 -999.990 2.439 ..P WKT 2011 04 21 18 19 55 31.3200 -97.3300 251.000 122.0 237.718 5.990 -999.990 -999.990 2.377 ..P WKT 2011 04 21 18 24 55 31.3200 -97.3300 251.000 457.0 240.651 5.260 -999.990 -999.990 2.407 ..P WKT 2011 04 21 18 29 55 31.3200 -97.3300 251.000 30.0 229.796 4.440 -999.990 -999.990 2.298 ..P WKT 2011 04 21 18 34 55 31.3200 -97.3300 251.000 122.0 214.740 4.220 -999.990 -999.990 2.147 ..P WKT 2011 04 21 18 39 55 31.3200 -97.3300 251.000 457.0 206.074 4.420 -999.990 -999.990 2.061 ..P WKT 2011 04 21 18 49 55 31.3200 -97.3300 251.000 30.0 187.429 4.710 -999.990 -999.990 1.874 ..P WKT 2011 04 21 18 54 55 31.3200 -97.3300 251.000 122.0 183.162 3.970 -999.990 -999.990 1.832 ..P WKT 2011 04 21 18 59 55 31.3200 -97.3300 251.000 457.0 179.568 4.440 -999.990 -999.990 1.796 ..P WKT 2011 04 21 19 04 55 31.3200 -97.3300 251.000 30.0 180.009 4.300 -999.990 -999.990 1.800 ..P WKT 2011 04 21 19 09 55 31.3200 -97.3300 251.000 122.0 183.474 4.660 -999.990 -999.990 1.835 ..P WKT 2011 04 21 19 14 55 31.3200 -97.3300 251.000 457.0 183.745 4.430 -999.990 -999.990 1.837 ..P WKT 2011 04 21 19 24 55 31.3200 -97.3300 251.000 30.0 167.108 4.200 -999.990 -999.990 1.671 ..P WKT 2011 04 21 19 29 55 31.3200 -97.3300 251.000 122.0 167.164 4.710 -999.990 -999.990 1.672 ..P WKT 2011 04 21 19 34 55 31.3200 -97.3300 251.000 457.0 168.901 4.240 -999.990 -999.990 1.689 ..P WKT 2011 04 21 19 39 55 31.3200 -97.3300 251.000 30.0 150.990 4.250 -999.990 -999.990 1.510 ..P WKT 2011 04 21 19 44 55 31.3200 -97.3300 251.000 122.0 158.604 3.950 -999.990 -999.990 1.586 ..P WKT 2011 04 21 19 49 55 31.3200 -97.3300 251.000 457.0 160.509 3.890 -999.990 -999.990 1.605 ..P WKT 2011 04 21 19 59 55 31.3200 -97.3300 251.000 30.0 144.510 3.820 -999.990 -999.990 1.445 ..P WKT 2011 04 21 20 04 55 31.3200 -97.3300 251.000 122.0 147.255 4.180 -999.990 -999.990 1.473 ..P WKT 2011 04 21 20 09 55 31.3200 -97.3300 251.000 457.0 151.342 4.360 -999.990 -999.990 1.513 ..P WKT 2011 04 21 20 14 55 31.3200 -97.3300 251.000 30.0 136.465 3.980 -999.990 -999.990 1.365 ..P WKT 2011 04 21 20 19 55 31.3200 -97.3300 251.000 122.0 136.189 3.720 -999.990 -999.990 1.362 ..P WKT 2011 04 21 20 24 55 31.3200 -97.3300 251.000 457.0 129.873 5.720 -999.990 -999.990 1.299 ..P WKT 2011 04 21 20 34 55 31.3200 -97.3300 251.000 30.0 132.726 4.190 -999.990 -999.990 1.327 ..P WKT 2011 04 21 20 39 55 31.3200 -97.3300 251.000 122.0 130.150 3.430 -999.990 -999.990 1.302 ..P WKT 2011 04 21 20 44 55 31.3200 -97.3300 251.000 457.0 129.924 3.510 -999.990 -999.990 1.299 ..P WKT 2011 04 21 20 49 55 31.3200 -97.3300 251.000 30.0 127.349 3.430 -999.990 -999.990 1.273 ..P WKT 2011 04 21 20 54 55 31.3200 -97.3300 251.000 122.0 135.843 3.320 -999.990 -999.990 1.358 ..P WKT 2011 04 21 20 59 55 31.3200 -97.3300 251.000 457.0 121.865 3.230 -999.990 -999.990 1.219 ..P WKT 2011 04 21 21 09 55 31.3200 -97.3300 251.000 30.0 130.083 3.680 -999.990 -999.990 1.301 ..P WKT 2011 04 21 21 14 55 31.3200 -97.3300 251.000 122.0 130.478 3.120 -999.990 -999.990 1.305 ..P WKT 2011 04 21 21 19 55 31.3200 -97.3300 251.000 457.0 130.875 4.220 -999.990 -999.990 1.309 ..P WKT 2011 04 21 21 24 55 31.3200 -97.3300 251.000 30.0 138.979 5.170 -999.990 -999.990 1.390 ..P WKT 2011 04 21 21 29 55 31.3200 -97.3300 251.000 122.0 145.741 4.900 -999.990 -999.990 1.457 ..P WKT 2011 04 21 21 34 55 31.3200 -97.3300 251.000 457.0 132.396 2.770 -999.990 -999.990 1.324 ..P WKT 2011 04 21 21 44 55 31.3200 -97.3300 251.000 30.0 132.038 3.230 -999.990 -999.990 1.320 ..P WKT 2011 04 21 21 49 55 31.3200 -97.3300 251.000 122.0 136.645 3.910 -999.990 -999.990 1.366 ..P WKT 2011 04 21 21 54 55 31.3200 -97.3300 251.000 457.0 135.556 4.920 -999.990 -999.990 1.356 ..P WKT 2011 04 21 21 59 55 31.3200 -97.3300 251.000 30.0 133.799 3.640 -999.990 -999.990 1.338 ..P WKT 2011 04 21 22 04 55 31.3200 -97.3300 251.000 122.0 141.083 3.330 -999.990 -999.990 1.411 ..P WKT 2011 04 21 22 09 55 31.3200 -97.3300 251.000 457.0 138.990 2.470 -999.990 -999.990 1.390 ..P WKT 2011 04 21 22 19 55 31.3200 -97.3300 251.000 30.0 143.965 3.170 -999.990 -999.990 1.440 ..P WKT 2011 04 21 22 24 55 31.3200 -97.3300 251.000 122.0 141.656 3.350 -999.990 -999.990 1.417 ..P WKT 2011 04 21 22 29 55 31.3200 -97.3300 251.000 457.0 142.528 3.610 -999.990 -999.990 1.425 ..P WKT 2011 04 21 22 34 55 31.3200 -97.3300 251.000 30.0 138.212 2.920 -999.990 -999.990 1.382 ..P WKT 2011 04 21 22 39 55 31.3200 -97.3300 251.000 122.0 140.424 3.160 -999.990 -999.990 1.404 ..P WKT 2011 04 21 22 44 55 31.3200 -97.3300 251.000 457.0 139.622 3.280 -999.990 -999.990 1.396 ..P WKT 2011 04 21 22 54 55 31.3200 -97.3300 251.000 30.0 141.965 4.690 -999.990 -999.990 1.420 ..P WKT 2011 04 21 22 59 55 31.3200 -97.3300 251.000 122.0 146.946 4.650 -999.990 -999.990 1.469 ..P WKT 2011 04 21 23 04 55 31.3200 -97.3300 251.000 457.0 146.074 6.580 -999.990 -999.990 1.461 ..P WKT 2011 04 21 23 09 55 31.3200 -97.3300 251.000 30.0 141.688 4.410 -999.990 -999.990 1.417 ..P WKT 2011 04 21 23 14 55 31.3200 -97.3300 251.000 122.0 152.690 4.750 -999.990 -999.990 1.527 ..P WKT 2011 04 21 23 19 55 31.3200 -97.3300 251.000 457.0 149.642 3.660 -999.990 -999.990 1.496 ..P WKT 2011 04 21 23 29 55 31.3200 -97.3300 251.000 30.0 142.135 3.690 -999.990 -999.990 1.421 ..P WKT 2011 04 21 23 34 55 31.3200 -97.3300 251.000 122.0 151.883 3.930 -999.990 -999.990 1.519 ..P WKT 2011 04 21 23 39 55 31.3200 -97.3300 251.000 457.0 147.924 3.580 -999.990 -999.990 1.479 ..P WKT 2011 04 21 23 44 55 31.3200 -97.3300 251.000 30.0 143.130 4.530 -999.990 -999.990 1.431 ..P WKT 2011 04 21 23 49 55 31.3200 -97.3300 251.000 122.0 143.851 3.620 -999.990 -999.990 1.439 ..P WKT 2011 04 22 00 09 55 31.3200 -97.3300 251.000 457.0 141.438 3.110 -999.990 -999.990 1.414 ..P WKT 2011 04 22 00 10 25 31.3200 -97.3300 251.000 457.0 139.488 3.150 -999.990 -999.990 1.395 ..P WKT 2011 04 22 00 10 55 31.3200 -97.3300 251.000 457.0 144.387 5.080 -999.990 -999.990 1.444 ..P WKT 2011 04 22 00 11 25 31.3200 -97.3300 251.000 457.0 145.610 3.820 -999.990 -999.990 1.456 ..P WKT 2011 04 22 00 11 55 31.3200 -97.3300 251.000 457.0 142.491 3.900 -999.990 -999.990 1.425 ..P WKT 2011 04 22 00 12 25 31.3200 -97.3300 251.000 457.0 142.044 4.410 -999.990 -999.990 1.420 ..P WKT 2011 04 22 00 12 55 31.3200 -97.3300 251.000 457.0 145.271 3.340 -999.990 -999.990 1.453 ..P WKT 2011 04 22 00 13 25 31.3200 -97.3300 251.000 457.0 144.157 3.160 -999.990 -999.990 1.442 ..P WKT 2011 04 22 00 13 55 31.3200 -97.3300 251.000 457.0 144.043 3.120 -999.990 -999.990 1.440 ..P WKT 2011 04 22 00 14 25 31.3200 -97.3300 251.000 457.0 144.431 3.040 -999.990 -999.990 1.444 ..P WKT 2011 04 22 00 14 55 31.3200 -97.3300 251.000 457.0 144.820 3.140 -999.990 -999.990 1.448 ..P WKT 2011 04 22 00 19 55 31.3200 -97.3300 251.000 30.0 140.352 3.530 -999.990 -999.990 1.404 ..P WKT 2011 04 22 00 24 55 31.3200 -97.3300 251.000 122.0 148.572 2.840 -999.990 -999.990 1.486 ..P WKT 2011 04 22 00 29 55 31.3200 -97.3300 251.000 457.0 139.433 3.150 -999.990 -999.990 1.394 ..P WKT 2011 04 22 00 34 55 31.3200 -97.3300 251.000 30.0 139.975 4.840 -999.990 -999.990 1.400 ..P WKT 2011 04 22 00 39 55 31.3200 -97.3300 251.000 122.0 142.519 2.770 -999.990 -999.990 1.425 ..P WKT 2011 04 22 00 44 55 31.3200 -97.3300 251.000 457.0 139.723 3.440 -999.990 -999.990 1.397 ..P WKT 2011 04 22 00 54 55 31.3200 -97.3300 251.000 30.0 139.499 2.470 -999.990 -999.990 1.395 ..P WKT 2011 04 22 00 59 55 31.3200 -97.3300 251.000 122.0 138.067 3.230 -999.990 -999.990 1.381 ..P WKT 2011 04 22 01 04 55 31.3200 -97.3300 251.000 457.0 143.635 3.430 -999.990 -999.990 1.436 ..P WKT 2011 04 22 01 09 55 31.3200 -97.3300 251.000 30.0 137.203 3.000 -999.990 -999.990 1.372 ..P WKT 2011 04 22 01 14 55 31.3200 -97.3300 251.000 122.0 147.767 3.130 -999.990 -999.990 1.478 ..P WKT 2011 04 22 01 19 55 31.3200 -97.3300 251.000 457.0 145.334 3.340 -999.990 -999.990 1.453 ..P WKT 2011 04 22 01 29 55 31.3200 -97.3300 251.000 30.0 142.423 2.550 -999.990 -999.990 1.424 ..P WKT 2011 04 22 01 34 55 31.3200 -97.3300 251.000 122.0 146.937 3.200 -999.990 -999.990 1.469 ..P WKT 2011 04 22 01 39 55 31.3200 -97.3300 251.000 457.0 147.788 3.240 -999.990 -999.990 1.478 ..P WKT 2011 04 22 01 44 55 31.3200 -97.3300 251.000 30.0 148.971 3.090 -999.990 -999.990 1.490 ..P WKT 2011 04 22 01 49 55 31.3200 -97.3300 251.000 122.0 158.471 3.720 -999.990 -999.990 1.585 ..P WKT 2011 04 22 01 54 55 31.3200 -97.3300 251.000 457.0 157.656 2.410 -999.990 -999.990 1.577 ..P WKT 2011 04 22 02 04 55 31.3200 -97.3300 251.000 30.0 157.784 2.930 -999.990 -999.990 1.578 ..P WKT 2011 04 22 02 09 55 31.3200 -97.3300 251.000 122.0 164.045 4.320 -999.990 -999.990 1.640 ..P WKT 2011 04 22 02 14 55 31.3200 -97.3300 251.000 457.0 163.490 3.210 -999.990 -999.990 1.635 ..P WKT 2011 04 22 02 19 55 31.3200 -97.3300 251.000 30.0 159.613 3.360 -999.990 -999.990 1.596 ..P WKT 2011 04 22 02 24 55 31.3200 -97.3300 251.000 122.0 161.551 2.560 -999.990 -999.990 1.616 ..P WKT 2011 04 22 02 29 55 31.3200 -97.3300 251.000 457.0 165.648 2.900 -999.990 -999.990 1.656 ..P WKT 2011 04 22 02 39 55 31.3200 -97.3300 251.000 30.0 155.859 2.920 -999.990 -999.990 1.559 ..P WKT 2011 04 22 02 44 55 31.3200 -97.3300 251.000 122.0 157.749 3.080 -999.990 -999.990 1.577 ..P WKT 2011 04 22 02 49 55 31.3200 -97.3300 251.000 457.0 157.315 3.760 -999.990 -999.990 1.573 ..P WKT 2011 04 22 02 54 55 31.3200 -97.3300 251.000 30.0 151.904 4.580 -999.990 -999.990 1.519 ..P WKT 2011 04 22 02 59 55 31.3200 -97.3300 251.000 122.0 158.769 4.700 -999.990 -999.990 1.588 ..P WKT 2011 04 22 03 04 55 31.3200 -97.3300 251.000 457.0 157.506 3.550 -999.990 -999.990 1.575 ..P WKT 2011 04 22 03 14 55 31.3200 -97.3300 251.000 30.0 160.310 4.180 -999.990 -999.990 1.603 ..P WKT 2011 04 22 03 19 55 31.3200 -97.3300 251.000 122.0 157.911 4.120 -999.990 -999.990 1.579 ..P WKT 2011 04 22 03 24 55 31.3200 -97.3300 251.000 457.0 162.140 5.650 -999.990 -999.990 1.621 ..P WKT 2011 04 22 03 29 55 31.3200 -97.3300 251.000 30.0 161.233 3.760 -999.990 -999.990 1.612 ..P WKT 2011 04 22 03 34 55 31.3200 -97.3300 251.000 122.0 151.050 4.650 -999.990 -999.990 1.511 ..P WKT 2011 04 22 03 39 55 31.3200 -97.3300 251.000 457.0 146.999 3.730 -999.990 -999.990 1.470 ..P WKT 2011 04 22 03 49 55 31.3200 -97.3300 251.000 30.0 148.573 4.010 -999.990 -999.990 1.486 ..P WKT 2011 04 22 03 54 55 31.3200 -97.3300 251.000 122.0 149.892 3.620 -999.990 -999.990 1.499 ..P WKT 2011 04 22 03 59 55 31.3200 -97.3300 251.000 457.0 155.346 4.580 -999.990 -999.990 1.553 ..P WKT 2011 04 22 04 04 55 31.3200 -97.3300 251.000 30.0 154.512 4.010 -999.990 -999.990 1.545 ..P WKT 2011 04 22 04 09 55 31.3200 -97.3300 251.000 122.0 159.136 3.380 -999.990 -999.990 1.591 ..P WKT 2011 04 22 04 14 55 31.3200 -97.3300 251.000 457.0 157.806 3.040 -999.990 -999.990 1.578 ..P WKT 2011 04 22 04 24 55 31.3200 -97.3300 251.000 30.0 157.956 3.040 -999.990 -999.990 1.580 ..P WKT 2011 04 22 04 29 55 31.3200 -97.3300 251.000 122.0 155.965 3.100 -999.990 -999.990 1.560 ..P WKT 2011 04 22 04 34 55 31.3200 -97.3300 251.000 457.0 156.620 2.990 -999.990 -999.990 1.566 ..P WKT 2011 04 22 04 39 55 31.3200 -97.3300 251.000 30.0 150.336 3.090 -999.990 -999.990 1.503 ..P WKT 2011 04 22 04 44 55 31.3200 -97.3300 251.000 122.0 150.660 3.640 -999.990 -999.990 1.507 ..P WKT 2011 04 22 04 49 55 31.3200 -97.3300 251.000 457.0 152.305 4.120 -999.990 -999.990 1.523 ..P WKT 2011 04 22 05 04 55 31.3200 -97.3300 251.000 30.0 154.008 3.420 -999.990 -999.990 1.540 ..P WKT 2011 04 22 05 09 55 31.3200 -97.3300 251.000 122.0 160.141 3.460 -999.990 -999.990 1.601 ..P WKT 2011 04 22 05 14 55 31.3200 -97.3300 251.000 457.0 172.540 3.560 -999.990 -999.990 1.725 ..P WKT 2011 04 22 05 19 55 31.3200 -97.3300 251.000 30.0 164.814 3.970 -999.990 -999.990 1.648 ..P WKT 2011 04 22 05 24 55 31.3200 -97.3300 251.000 122.0 167.973 4.120 -999.990 -999.990 1.680 ..P WKT 2011 04 22 05 29 55 31.3200 -97.3300 251.000 457.0 167.175 3.130 -999.990 -999.990 1.672 ..P WKT 2011 04 22 05 39 55 31.3200 -97.3300 251.000 30.0 163.284 3.030 -999.990 -999.990 1.633 ..P WKT 2011 04 22 05 44 55 31.3200 -97.3300 251.000 122.0 167.771 3.540 -999.990 -999.990 1.678 ..P WKT 2011 04 22 05 49 55 31.3200 -97.3300 251.000 457.0 171.926 3.600 -999.990 -999.990 1.719 ..P WKT 2011 04 22 05 54 55 31.3200 -97.3300 251.000 30.0 168.175 3.520 -999.990 -999.990 1.682 ..P WKT 2011 04 22 05 59 55 31.3200 -97.3300 251.000 122.0 171.342 4.080 -999.990 -999.990 1.713 ..P WKT 2011 04 22 06 04 55 31.3200 -97.3300 251.000 457.0 171.708 3.860 -999.990 -999.990 1.717 ..P WKT 2011 04 22 06 14 55 31.3200 -97.3300 251.000 30.0 171.335 5.520 -999.990 -999.990 1.713 ..P WKT 2011 04 22 06 19 55 31.3200 -97.3300 251.000 122.0 171.747 4.660 -999.990 -999.990 1.717 ..P WKT 2011 04 22 06 24 55 31.3200 -97.3300 251.000 457.0 171.338 5.290 -999.990 -999.990 1.713 ..P WKT 2011 04 22 06 29 55 31.3200 -97.3300 251.000 30.0 168.955 3.470 -999.990 -999.990 1.690 ..P WKT 2011 04 22 06 34 55 31.3200 -97.3300 251.000 122.0 165.258 3.820 -999.990 -999.990 1.653 ..P WKT 2011 04 22 06 39 55 31.3200 -97.3300 251.000 457.0 171.260 3.580 -999.990 -999.990 1.713 ..P WKT 2011 04 22 06 49 55 31.3200 -97.3300 251.000 30.0 166.710 4.120 -999.990 -999.990 1.667 ..P WKT 2011 04 22 06 54 55 31.3200 -97.3300 251.000 122.0 178.341 3.830 -999.990 -999.990 1.783 ..P WKT 2011 04 22 06 59 55 31.3200 -97.3300 251.000 457.0 192.102 4.360 -999.990 -999.990 1.921 ..P WKT 2011 04 22 07 04 55 31.3200 -97.3300 251.000 30.0 181.390 4.260 -999.990 -999.990 1.814 ..P WKT 2011 04 22 07 09 55 31.3200 -97.3300 251.000 122.0 177.415 4.870 -999.990 -999.990 1.774 ..P WKT 2011 04 22 07 14 55 31.3200 -97.3300 251.000 457.0 137.002 5.110 -999.990 -999.990 1.370 ..P WKT 2011 04 22 07 24 55 31.3200 -97.3300 251.000 30.0 171.427 4.520 -999.990 -999.990 1.714 ..P WKT 2011 04 22 07 29 55 31.3200 -97.3300 251.000 122.0 163.379 4.900 -999.990 -999.990 1.634 ..P WKT 2011 04 22 07 34 55 31.3200 -97.3300 251.000 457.0 122.042 4.940 -999.990 -999.990 1.220 ..P WKT 2011 04 22 07 39 55 31.3200 -97.3300 251.000 30.0 158.772 5.030 -999.990 -999.990 1.588 ..P WKT 2011 04 22 07 44 55 31.3200 -97.3300 251.000 122.0 161.551 5.860 -999.990 -999.990 1.616 ..P WKT 2011 04 22 07 49 55 31.3200 -97.3300 251.000 457.0 122.534 5.610 -999.990 -999.990 1.225 ..P WKT 2011 04 22 07 59 55 31.3200 -97.3300 251.000 30.0 126.677 5.320 -999.990 -999.990 1.267 ..P WKT 2011 04 22 08 04 55 31.3200 -97.3300 251.000 122.0 119.024 5.910 -999.990 -999.990 1.190 ..P WKT 2011 04 22 08 09 55 31.3200 -97.3300 251.000 457.0 106.626 4.790 -999.990 -999.990 1.066 ..P WKT 2011 04 22 08 14 55 31.3200 -97.3300 251.000 30.0 117.645 4.880 -999.990 -999.990 1.176 ..P WKT 2011 04 22 08 19 55 31.3200 -97.3300 251.000 122.0 116.875 4.940 -999.990 -999.990 1.169 ..P WKT 2011 04 22 08 24 55 31.3200 -97.3300 251.000 457.0 108.249 4.150 -999.990 -999.990 1.082 ..P WKT 2011 04 22 08 34 55 31.3200 -97.3300 251.000 30.0 107.670 4.030 -999.990 -999.990 1.077 ..P WKT 2011 04 22 08 39 55 31.3200 -97.3300 251.000 122.0 120.291 5.770 -999.990 -999.990 1.203 ..P WKT 2011 04 22 08 44 55 31.3200 -97.3300 251.000 457.0 106.088 4.830 -999.990 -999.990 1.061 ..P WKT 2011 04 22 08 49 55 31.3200 -97.3300 251.000 30.0 155.653 5.000 -999.990 -999.990 1.557 ..P WKT 2011 04 22 08 54 55 31.3200 -97.3300 251.000 122.0 145.699 4.700 -999.990 -999.990 1.457 ..P WKT 2011 04 22 08 59 55 31.3200 -97.3300 251.000 457.0 111.234 4.500 -999.990 -999.990 1.112 ..P WKT 2011 04 22 09 09 55 31.3200 -97.3300 251.000 30.0 183.771 5.510 -999.990 -999.990 1.838 ..P WKT 2011 04 22 09 14 55 31.3200 -97.3300 251.000 122.0 184.551 6.680 -999.990 -999.990 1.846 ..P WKT 2011 04 22 09 19 55 31.3200 -97.3300 251.000 457.0 146.468 4.490 -999.990 -999.990 1.465 ..P WKT 2011 04 22 09 24 55 31.3200 -97.3300 251.000 30.0 186.111 5.070 -999.990 -999.990 1.861 ..P WKT 2011 04 22 09 29 55 31.3200 -97.3300 251.000 122.0 188.523 4.840 -999.990 -999.990 1.885 ..P WKT 2011 04 22 09 34 55 31.3200 -97.3300 251.000 457.0 124.353 5.080 -999.990 -999.990 1.244 ..P WKT 2011 04 22 09 44 55 31.3200 -97.3300 251.000 30.0 191.814 4.980 -999.990 -999.990 1.918 ..P WKT 2011 04 22 09 49 55 31.3200 -97.3300 251.000 122.0 202.028 5.470 -999.990 -999.990 2.020 ..P WKT 2011 04 22 09 54 55 31.3200 -97.3300 251.000 457.0 243.218 4.900 -999.990 -999.990 2.432 ..P WKT 2011 04 22 09 59 55 31.3200 -97.3300 251.000 30.0 191.795 4.830 -999.990 -999.990 1.918 ..P WKT 2011 04 22 10 04 55 31.3200 -97.3300 251.000 122.0 193.527 4.680 -999.990 -999.990 1.935 ..P WKT 2011 04 22 10 09 55 31.3200 -97.3300 251.000 457.0 240.397 5.840 -999.990 -999.990 2.404 ..P WKT 2011 04 22 10 19 55 31.3200 -97.3300 251.000 30.0 189.481 5.040 -999.990 -999.990 1.895 ..P WKT 2011 04 22 10 24 55 31.3200 -97.3300 251.000 122.0 193.213 5.510 -999.990 -999.990 1.932 ..P WKT 2011 04 22 10 29 55 31.3200 -97.3300 251.000 457.0 223.483 4.790 -999.990 -999.990 2.235 ..P WKT 2011 04 22 10 34 55 31.3200 -97.3300 251.000 30.0 187.323 4.770 -999.990 -999.990 1.873 ..P WKT 2011 04 22 10 39 55 31.3200 -97.3300 251.000 122.0 187.310 4.780 -999.990 -999.990 1.873 ..P WKT 2011 04 22 10 44 55 31.3200 -97.3300 251.000 457.0 200.477 4.680 -999.990 -999.990 2.005 ..P WKT 2011 04 22 10 54 55 31.3200 -97.3300 251.000 30.0 190.081 4.630 -999.990 -999.990 1.901 ..P WKT 2011 04 22 10 59 55 31.3200 -97.3300 251.000 122.0 191.089 4.650 -999.990 -999.990 1.911 ..P WKT 2011 04 22 11 04 55 31.3200 -97.3300 251.000 457.0 198.438 5.470 -999.990 -999.990 1.984 ..P WKT 2011 04 22 11 09 55 31.3200 -97.3300 251.000 30.0 180.263 5.090 -999.990 -999.990 1.803 ..P WKT 2011 04 22 11 14 55 31.3200 -97.3300 251.000 122.0 186.473 5.100 -999.990 -999.990 1.865 ..P WKT 2011 04 22 11 19 55 31.3200 -97.3300 251.000 457.0 209.578 5.040 -999.990 -999.990 2.096 ..P WKT 2011 04 22 11 29 55 31.3200 -97.3300 251.000 30.0 178.136 4.800 -999.990 -999.990 1.781 ..P WKT 2011 04 22 11 34 55 31.3200 -97.3300 251.000 122.0 177.692 5.000 -999.990 -999.990 1.777 ..P WKT 2011 04 22 11 39 55 31.3200 -97.3300 251.000 457.0 180.658 5.210 -999.990 -999.990 1.807 ..P WKT 2011 04 22 11 44 55 31.3200 -97.3300 251.000 30.0 173.559 5.320 -999.990 -999.990 1.736 ..P WKT 2011 04 22 11 49 55 31.3200 -97.3300 251.000 122.0 175.713 4.870 -999.990 -999.990 1.757 ..P WKT 2011 04 22 12 09 55 31.3200 -97.3300 251.000 457.0 175.333 5.260 -999.990 -999.990 1.753 ..P WKT 2011 04 22 12 10 25 31.3200 -97.3300 251.000 457.0 173.047 5.800 -999.990 -999.990 1.730 ..P WKT 2011 04 22 12 10 55 31.3200 -97.3300 251.000 457.0 170.761 5.460 -999.990 -999.990 1.708 ..P WKT 2011 04 22 12 11 25 31.3200 -97.3300 251.000 457.0 174.964 5.020 -999.990 -999.990 1.750 ..P WKT 2011 04 22 12 11 55 31.3200 -97.3300 251.000 457.0 174.625 4.910 -999.990 -999.990 1.746 ..P WKT 2011 04 22 12 12 25 31.3200 -97.3300 251.000 457.0 176.558 4.840 -999.990 -999.990 1.766 ..P WKT 2011 04 22 12 12 55 31.3200 -97.3300 251.000 457.0 171.026 5.040 -999.990 -999.990 1.710 ..P WKT 2011 04 22 12 13 25 31.3200 -97.3300 251.000 457.0 175.555 5.430 -999.990 -999.990 1.756 ..P WKT 2011 04 22 12 13 55 31.3200 -97.3300 251.000 457.0 175.540 5.300 -999.990 -999.990 1.755 ..P WKT 2011 04 22 12 14 25 31.3200 -97.3300 251.000 457.0 176.823 4.840 -999.990 -999.990 1.768 ..P WKT 2011 04 22 12 14 55 31.3200 -97.3300 251.000 457.0 176.484 4.920 -999.990 -999.990 1.765 ..P WKT 2011 04 22 12 19 55 31.3200 -97.3300 251.000 30.0 170.493 6.190 -999.990 -999.990 1.705 ..P WKT 2011 04 22 12 24 55 31.3200 -97.3300 251.000 122.0 172.293 4.890 -999.990 -999.990 1.723 ..P WKT 2011 04 22 12 29 55 31.3200 -97.3300 251.000 457.0 170.196 5.470 -999.990 -999.990 1.702 ..P WKT 2011 04 22 12 34 55 31.3200 -97.3300 251.000 30.0 159.978 4.750 -999.990 -999.990 1.600 ..P WKT 2011 04 22 12 39 55 31.3200 -97.3300 251.000 122.0 170.223 4.580 -999.990 -999.990 1.702 ..P WKT 2011 04 22 12 44 55 31.3200 -97.3300 251.000 457.0 167.150 4.520 -999.990 -999.990 1.671 ..P WKT 2011 04 22 12 54 55 31.3200 -97.3300 251.000 30.0 164.292 4.490 -999.990 -999.990 1.643 ..P WKT 2011 04 22 12 59 55 31.3200 -97.3300 251.000 122.0 165.484 4.450 -999.990 -999.990 1.655 ..P WKT 2011 04 22 13 04 55 31.3200 -97.3300 251.000 457.0 172.852 4.880 -999.990 -999.990 1.729 ..P WKT 2011 04 22 13 09 55 31.3200 -97.3300 251.000 30.0 162.015 5.310 -999.990 -999.990 1.620 ..P WKT 2011 04 22 13 14 55 31.3200 -97.3300 251.000 122.0 169.061 5.500 -999.990 -999.990 1.691 ..P WKT 2011 04 22 13 19 55 31.3200 -97.3300 251.000 457.0 175.133 5.230 -999.990 -999.990 1.751 ..P WKT 2011 04 22 13 29 55 31.3200 -97.3300 251.000 30.0 159.999 5.220 -999.990 -999.990 1.600 ..P WKT 2011 04 22 13 34 55 31.3200 -97.3300 251.000 122.0 167.746 5.250 -999.990 -999.990 1.677 ..P WKT 2011 04 22 13 39 55 31.3200 -97.3300 251.000 457.0 168.010 5.350 -999.990 -999.990 1.680 ..P WKT 2011 04 22 13 44 55 31.3200 -97.3300 251.000 30.0 157.207 5.150 -999.990 -999.990 1.572 ..P WKT 2011 04 22 13 49 55 31.3200 -97.3300 251.000 122.0 168.213 4.810 -999.990 -999.990 1.682 ..P WKT 2011 04 22 13 54 55 31.3200 -97.3300 251.000 457.0 172.709 4.830 -999.990 -999.990 1.727 ..P WKT 2011 04 22 14 04 55 31.3200 -97.3300 251.000 30.0 168.563 4.590 -999.990 -999.990 1.686 ..P WKT 2011 04 22 14 09 55 31.3200 -97.3300 251.000 122.0 168.547 4.840 -999.990 -999.990 1.685 ..P WKT 2011 04 22 14 14 55 31.3200 -97.3300 251.000 457.0 169.835 4.870 -999.990 -999.990 1.698 ..P WKT 2011 04 22 14 19 55 31.3200 -97.3300 251.000 30.0 161.511 5.430 -999.990 -999.990 1.615 ..P WKT 2011 04 22 14 24 55 31.3200 -97.3300 251.000 122.0 169.154 4.470 -999.990 -999.990 1.692 ..P WKT 2011 04 22 14 29 55 31.3200 -97.3300 251.000 457.0 166.695 5.750 -999.990 -999.990 1.667 ..P WKT 2011 04 22 14 39 55 31.3200 -97.3300 251.000 30.0 160.049 5.000 -999.990 -999.990 1.600 ..P WKT 2011 04 22 14 44 55 31.3200 -97.3300 251.000 122.0 158.145 5.240 -999.990 -999.990 1.581 ..P WKT 2011 04 22 14 49 55 31.3200 -97.3300 251.000 457.0 158.198 4.700 -999.990 -999.990 1.582 ..P WKT 2011 04 22 14 54 55 31.3200 -97.3300 251.000 30.0 153.358 5.090 -999.990 -999.990 1.534 ..P WKT 2011 04 22 14 59 55 31.3200 -97.3300 251.000 122.0 153.410 4.530 -999.990 -999.990 1.534 ..P WKT 2011 04 22 15 04 55 31.3200 -97.3300 251.000 457.0 155.584 4.350 -999.990 -999.990 1.556 ..P WKT 2011 04 22 15 14 55 31.3200 -97.3300 251.000 30.0 155.153 4.940 -999.990 -999.990 1.552 ..P WKT 2011 04 22 15 19 55 31.3200 -97.3300 251.000 122.0 155.485 5.090 -999.990 -999.990 1.555 ..P WKT 2011 04 22 15 24 55 31.3200 -97.3300 251.000 457.0 150.266 5.240 -999.990 -999.990 1.503 ..P WKT 2011 04 22 15 29 55 31.3200 -97.3300 251.000 30.0 154.518 5.710 -999.990 -999.990 1.545 ..P WKT 2011 04 22 15 34 55 31.3200 -97.3300 251.000 122.0 145.051 5.200 -999.990 -999.990 1.451 ..P WKT 2011 04 22 15 39 55 31.3200 -97.3300 251.000 457.0 152.733 4.940 -999.990 -999.990 1.527 ..P WKT 2011 04 22 15 49 55 31.3200 -97.3300 251.000 30.0 145.670 4.750 -999.990 -999.990 1.457 ..P WKT 2011 04 22 15 54 55 31.3200 -97.3300 251.000 122.0 149.224 5.170 -999.990 -999.990 1.492 ..P WKT 2011 04 22 15 59 55 31.3200 -97.3300 251.000 457.0 138.394 6.000 -999.990 -999.990 1.384 ..P WKT 2011 04 22 16 04 55 31.3200 -97.3300 251.000 30.0 136.389 7.280 -999.990 -999.990 1.364 ..P WKT 2011 04 22 16 09 55 31.3200 -97.3300 251.000 122.0 141.905 7.340 -999.990 -999.990 1.419 ..P WKT 2011 04 22 16 14 55 31.3200 -97.3300 251.000 457.0 134.993 5.110 -999.990 -999.990 1.350 ..P WKT 2011 04 22 16 24 55 31.3200 -97.3300 251.000 30.0 137.592 4.990 -999.990 -999.990 1.376 ..P WKT 2011 04 22 16 29 55 31.3200 -97.3300 251.000 122.0 136.965 6.650 -999.990 -999.990 1.370 ..P WKT 2011 04 22 16 34 55 31.3200 -97.3300 251.000 457.0 134.046 7.230 -999.990 -999.990 1.340 ..P WKT 2011 04 22 16 39 55 31.3200 -97.3300 251.000 30.0 136.363 6.010 -999.990 -999.990 1.364 ..P WKT 2011 04 22 16 44 55 31.3200 -97.3300 251.000 122.0 136.717 4.510 -999.990 -999.990 1.367 ..P WKT 2011 04 22 16 49 55 31.3200 -97.3300 251.000 457.0 133.796 4.600 -999.990 -999.990 1.338 ..P WKT 2011 04 22 17 04 55 31.3200 -97.3300 251.000 30.0 137.887 4.980 -999.990 -999.990 1.379 ..P WKT 2011 04 22 17 09 55 31.3200 -97.3300 251.000 122.0 135.989 4.730 -999.990 -999.990 1.360 ..P WKT 2011 04 22 17 14 55 31.3200 -97.3300 251.000 457.0 137.367 4.920 -999.990 -999.990 1.374 ..P WKT 2011 04 22 17 19 55 31.3200 -97.3300 251.000 30.0 133.173 4.440 -999.990 -999.990 1.332 ..P WKT 2011 04 22 17 24 55 31.3200 -97.3300 251.000 122.0 136.519 4.950 -999.990 -999.990 1.365 ..P WKT 2011 04 22 17 29 55 31.3200 -97.3300 251.000 457.0 131.667 4.170 -999.990 -999.990 1.317 ..P WKT 2011 04 22 17 39 55 31.3200 -97.3300 251.000 30.0 126.160 4.130 -999.990 -999.990 1.262 ..P WKT 2011 04 22 17 44 55 31.3200 -97.3300 251.000 122.0 126.818 4.310 -999.990 -999.990 1.268 ..P WKT 2011 04 22 17 49 55 31.3200 -97.3300 251.000 457.0 126.163 5.670 -999.990 -999.990 1.262 ..P WKT 2011 04 22 17 54 55 31.3200 -97.3300 251.000 30.0 126.984 4.960 -999.990 -999.990 1.270 ..P WKT 2011 04 22 17 59 55 31.3200 -97.3300 251.000 122.0 131.253 4.690 -999.990 -999.990 1.313 ..P WKT 2011 04 22 18 04 55 31.3200 -97.3300 251.000 457.0 124.198 4.570 -999.990 -999.990 1.242 ..P WKT 2011 04 22 18 14 55 31.3200 -97.3300 251.000 30.0 129.641 6.130 -999.990 -999.990 1.296 ..P WKT 2011 04 22 18 19 55 31.3200 -97.3300 251.000 122.0 124.248 5.210 -999.990 -999.990 1.242 ..P WKT 2011 04 22 18 24 55 31.3200 -97.3300 251.000 457.0 127.228 4.520 -999.990 -999.990 1.272 ..P WKT 2011 04 22 18 29 55 31.3200 -97.3300 251.000 30.0 130.868 4.920 -999.990 -999.990 1.309 ..P WKT 2011 04 22 18 34 55 31.3200 -97.3300 251.000 122.0 129.250 5.100 -999.990 -999.990 1.292 ..P WKT 2011 04 22 18 39 55 31.3200 -97.3300 251.000 457.0 124.181 4.770 -999.990 -999.990 1.242 ..P WKT 2011 04 22 18 49 55 31.3200 -97.3300 251.000 30.0 119.111 5.080 -999.990 -999.990 1.191 ..P WKT 2011 04 22 18 54 55 31.3200 -97.3300 251.000 122.0 124.866 5.360 -999.990 -999.990 1.249 ..P WKT 2011 04 22 18 59 55 31.3200 -97.3300 251.000 457.0 121.249 4.800 -999.990 -999.990 1.212 ..P WKT 2011 04 22 19 04 55 31.3200 -97.3300 251.000 30.0 125.032 4.670 -999.990 -999.990 1.250 ..P WKT 2011 04 22 19 09 55 31.3200 -97.3300 251.000 122.0 123.553 4.750 -999.990 -999.990 1.236 ..P WKT 2011 04 22 19 14 55 31.3200 -97.3300 251.000 457.0 127.996 4.850 -999.990 -999.990 1.280 ..P WKT 2011 04 22 19 24 55 31.3200 -97.3300 251.000 30.0 123.203 4.630 -999.990 -999.990 1.232 ..P WKT 2011 04 22 19 29 55 31.3200 -97.3300 251.000 122.0 129.929 5.380 -999.990 -999.990 1.299 ..P WKT 2011 04 22 19 34 55 31.3200 -97.3300 251.000 457.0 126.780 5.080 -999.990 -999.990 1.268 ..P WKT 2011 04 22 19 39 55 31.3200 -97.3300 251.000 30.0 127.416 4.930 -999.990 -999.990 1.274 ..P WKT 2011 04 22 19 44 55 31.3200 -97.3300 251.000 122.0 129.371 4.470 -999.990 -999.990 1.294 ..P WKT 2011 04 22 19 49 55 31.3200 -97.3300 251.000 457.0 122.761 4.460 -999.990 -999.990 1.228 ..P WKT 2011 04 22 19 59 55 31.3200 -97.3300 251.000 30.0 127.164 5.660 -999.990 -999.990 1.272 ..P WKT 2011 04 22 20 04 55 31.3200 -97.3300 251.000 122.0 132.415 4.670 -999.990 -999.990 1.324 ..P WKT 2011 04 22 20 09 55 31.3200 -97.3300 251.000 457.0 127.450 4.660 -999.990 -999.990 1.274 ..P WKT 2011 04 22 20 14 55 31.3200 -97.3300 251.000 30.0 134.021 4.950 -999.990 -999.990 1.340 ..P WKT 2011 04 22 20 19 55 31.3200 -97.3300 251.000 122.0 133.341 5.570 -999.990 -999.990 1.333 ..P WKT 2011 04 22 20 24 55 31.3200 -97.3300 251.000 457.0 126.724 4.160 -999.990 -999.990 1.267 ..P WKT 2011 04 22 20 34 55 31.3200 -97.3300 251.000 30.0 131.299 4.390 -999.990 -999.990 1.313 ..P WKT 2011 04 22 20 39 55 31.3200 -97.3300 251.000 122.0 135.566 4.990 -999.990 -999.990 1.356 ..P WKT 2011 04 22 20 44 55 31.3200 -97.3300 251.000 457.0 127.296 5.110 -999.990 -999.990 1.273 ..P WKT 2011 04 22 20 49 55 31.3200 -97.3300 251.000 30.0 127.274 4.660 -999.990 -999.990 1.273 ..P WKT 2011 04 22 20 54 55 31.3200 -97.3300 251.000 122.0 136.824 4.270 -999.990 -999.990 1.368 ..P WKT 2011 04 22 20 59 55 31.3200 -97.3300 251.000 457.0 129.870 4.200 -999.990 -999.990 1.299 ..P WKT 2011 04 22 21 09 55 31.3200 -97.3300 251.000 30.0 133.932 4.290 -999.990 -999.990 1.339 ..P WKT 2011 04 22 21 14 55 31.3200 -97.3300 251.000 122.0 138.677 4.340 -999.990 -999.990 1.387 ..P WKT 2011 04 22 21 19 55 31.3200 -97.3300 251.000 457.0 134.834 4.800 -999.990 -999.990 1.348 ..P WKT 2011 04 22 21 24 55 31.3200 -97.3300 251.000 30.0 132.972 4.250 -999.990 -999.990 1.330 ..P WKT 2011 04 22 21 29 55 31.3200 -97.3300 251.000 122.0 139.042 4.070 -999.990 -999.990 1.390 ..P WKT 2011 04 22 21 34 55 31.3200 -97.3300 251.000 457.0 131.892 4.400 -999.990 -999.990 1.319 ..P WKT 2011 04 22 21 44 55 31.3200 -97.3300 251.000 30.0 128.708 4.550 -999.990 -999.990 1.287 ..P WKT 2011 04 22 21 49 55 31.3200 -97.3300 251.000 122.0 131.852 5.060 -999.990 -999.990 1.319 ..P WKT 2011 04 22 21 54 55 31.3200 -97.3300 251.000 457.0 132.185 4.490 -999.990 -999.990 1.322 ..P WKT 2011 04 22 21 59 55 31.3200 -97.3300 251.000 30.0 131.525 4.360 -999.990 -999.990 1.315 ..P WKT 2011 04 22 22 04 55 31.3200 -97.3300 251.000 122.0 128.053 5.430 -999.990 -999.990 1.281 ..P WKT 2011 04 22 22 09 55 31.3200 -97.3300 251.000 457.0 132.853 4.780 -999.990 -999.990 1.329 ..P WKT 2011 04 22 22 19 55 31.3200 -97.3300 251.000 30.0 130.139 5.820 -999.990 -999.990 1.301 ..P WKT 2011 04 22 22 24 55 31.3200 -97.3300 251.000 122.0 131.560 4.300 -999.990 -999.990 1.316 ..P WKT 2011 04 22 22 29 55 31.3200 -97.3300 251.000 457.0 123.543 5.030 -999.990 -999.990 1.235 ..P WKT 2011 04 22 22 34 55 31.3200 -97.3300 251.000 30.0 124.964 4.350 -999.990 -999.990 1.250 ..P WKT 2011 04 22 22 39 55 31.3200 -97.3300 251.000 122.0 127.379 4.440 -999.990 -999.990 1.274 ..P WKT 2011 04 22 22 44 55 31.3200 -97.3300 251.000 457.0 129.297 4.650 -999.990 -999.990 1.293 ..P WKT 2011 04 22 22 54 55 31.3200 -97.3300 251.000 30.0 124.945 7.500 -999.990 -999.990 1.249 ..P WKT 2011 04 22 22 59 55 31.3200 -97.3300 251.000 122.0 130.107 4.310 -999.990 -999.990 1.301 ..P WKT 2011 04 22 23 04 55 31.3200 -97.3300 251.000 457.0 129.305 4.260 -999.990 -999.990 1.293 ..P WKT 2011 04 22 23 09 55 31.3200 -97.3300 251.000 30.0 130.491 5.360 -999.990 -999.990 1.305 ..P WKT 2011 04 22 23 14 55 31.3200 -97.3300 251.000 122.0 128.859 4.630 -999.990 -999.990 1.289 ..P WKT 2011 04 22 23 19 55 31.3200 -97.3300 251.000 457.0 127.060 4.480 -999.990 -999.990 1.271 ..P WKT 2011 04 22 23 29 55 31.3200 -97.3300 251.000 30.0 132.108 4.480 -999.990 -999.990 1.321 ..P WKT 2011 04 22 23 34 55 31.3200 -97.3300 251.000 122.0 126.514 4.730 -999.990 -999.990 1.265 ..P WKT 2011 04 22 23 39 55 31.3200 -97.3300 251.000 457.0 129.215 4.500 -999.990 -999.990 1.292 ..P WKT 2011 04 22 23 44 55 31.3200 -97.3300 251.000 30.0 129.427 4.540 -999.990 -999.990 1.294 ..P WKT 2011 04 22 23 49 55 31.3200 -97.3300 251.000 122.0 128.809 4.420 -999.990 -999.990 1.288 ..P WKT 2011 04 23 00 09 55 31.3200 -97.3300 251.000 457.0 133.967 4.220 -999.990 -999.990 1.340 ..P WKT 2011 04 23 00 10 25 31.3200 -97.3300 251.000 457.0 135.516 4.410 -999.990 -999.990 1.355 ..P WKT 2011 04 23 00 10 55 31.3200 -97.3300 251.000 457.0 136.399 4.560 -999.990 -999.990 1.364 ..P WKT 2011 04 23 00 11 25 31.3200 -97.3300 251.000 457.0 136.287 4.330 -999.990 -999.990 1.363 ..P WKT 2011 04 23 00 11 55 31.3200 -97.3300 251.000 457.0 139.164 4.270 -999.990 -999.990 1.392 ..P WKT 2011 04 23 00 12 25 31.3200 -97.3300 251.000 457.0 135.397 4.300 -999.990 -999.990 1.354 ..P WKT 2011 04 23 00 12 55 31.3200 -97.3300 251.000 457.0 134.289 4.450 -999.990 -999.990 1.343 ..P WKT 2011 04 23 00 13 25 31.3200 -97.3300 251.000 457.0 136.501 4.560 -999.990 -999.990 1.365 ..P WKT 2011 04 23 00 13 55 31.3200 -97.3300 251.000 457.0 132.403 5.090 -999.990 -999.990 1.324 ..P WKT 2011 04 23 00 14 25 31.3200 -97.3300 251.000 457.0 130.962 4.870 -999.990 -999.990 1.310 ..P WKT 2011 04 23 00 14 55 31.3200 -97.3300 251.000 457.0 140.813 4.470 -999.990 -999.990 1.408 ..P WKT 2011 04 23 00 19 55 31.3200 -97.3300 251.000 30.0 132.382 4.380 -999.990 -999.990 1.324 ..P WKT 2011 04 23 00 24 55 31.3200 -97.3300 251.000 122.0 133.250 5.620 -999.990 -999.990 1.333 ..P WKT 2011 04 23 00 29 55 31.3200 -97.3300 251.000 457.0 124.486 6.640 -999.990 -999.990 1.245 ..P WKT 2011 04 23 00 34 55 31.3200 -97.3300 251.000 30.0 128.675 6.960 -999.990 -999.990 1.287 ..P WKT 2011 04 23 00 39 55 31.3200 -97.3300 251.000 122.0 130.539 5.630 -999.990 -999.990 1.305 ..P WKT 2011 04 23 00 44 55 31.3200 -97.3300 251.000 457.0 122.439 5.670 -999.990 -999.990 1.224 ..P WKT 2011 04 23 00 54 55 31.3200 -97.3300 251.000 30.0 123.848 4.610 -999.990 -999.990 1.238 ..P WKT 2011 04 23 00 59 55 31.3200 -97.3300 251.000 122.0 131.032 5.570 -999.990 -999.990 1.310 ..P WKT 2011 04 23 01 04 55 31.3200 -97.3300 251.000 457.0 135.559 6.260 -999.990 -999.990 1.356 ..P WKT 2011 04 23 01 09 55 31.3200 -97.3300 251.000 30.0 134.771 5.190 -999.990 -999.990 1.348 ..P WKT 2011 04 23 01 14 55 31.3200 -97.3300 251.000 122.0 143.948 5.060 -999.990 -999.990 1.439 ..P WKT 2011 04 23 01 19 55 31.3200 -97.3300 251.000 457.0 139.175 4.520 -999.990 -999.990 1.392 ..P WKT 2011 04 23 01 29 55 31.3200 -97.3300 251.000 30.0 144.789 3.740 -999.990 -999.990 1.448 ..P WKT 2011 04 23 01 34 55 31.3200 -97.3300 251.000 122.0 153.184 4.130 -999.990 -999.990 1.532 ..P WKT 2011 04 23 01 39 55 31.3200 -97.3300 251.000 457.0 149.952 3.990 -999.990 -999.990 1.500 ..P WKT 2011 04 23 01 44 55 31.3200 -97.3300 251.000 30.0 152.866 4.420 -999.990 -999.990 1.529 ..P WKT 2011 04 23 01 49 55 31.3200 -97.3300 251.000 122.0 159.933 4.370 -999.990 -999.990 1.599 ..P WKT 2011 04 23 01 54 55 31.3200 -97.3300 251.000 457.0 163.179 3.770 -999.990 -999.990 1.632 ..P WKT 2011 04 23 02 04 55 31.3200 -97.3300 251.000 30.0 162.174 5.400 -999.990 -999.990 1.622 ..P WKT 2011 04 23 02 09 55 31.3200 -97.3300 251.000 122.0 167.888 4.080 -999.990 -999.990 1.679 ..P WKT 2011 04 23 02 14 55 31.3200 -97.3300 251.000 457.0 162.972 5.140 -999.990 -999.990 1.630 ..P WKT 2011 04 23 02 19 55 31.3200 -97.3300 251.000 30.0 167.689 4.680 -999.990 -999.990 1.677 ..P WKT 2011 04 23 02 24 55 31.3200 -97.3300 251.000 122.0 176.393 4.960 -999.990 -999.990 1.764 ..P WKT 2011 04 23 02 29 55 31.3200 -97.3300 251.000 457.0 164.833 4.370 -999.990 -999.990 1.648 ..P WKT 2011 04 23 02 39 55 31.3200 -97.3300 251.000 30.0 162.641 4.640 -999.990 -999.990 1.626 ..P WKT 2011 04 23 02 44 55 31.3200 -97.3300 251.000 122.0 163.372 4.990 -999.990 -999.990 1.634 ..P WKT 2011 04 23 02 49 55 31.3200 -97.3300 251.000 457.0 160.449 4.550 -999.990 -999.990 1.604 ..P WKT 2011 04 23 02 54 55 31.3200 -97.3300 251.000 30.0 168.323 5.190 -999.990 -999.990 1.683 ..P WKT 2011 04 23 02 59 55 31.3200 -97.3300 251.000 122.0 170.882 5.500 -999.990 -999.990 1.709 ..P WKT 2011 04 23 03 04 55 31.3200 -97.3300 251.000 457.0 160.151 4.680 -999.990 -999.990 1.602 ..P WKT 2011 04 23 03 14 55 31.3200 -97.3300 251.000 30.0 165.316 4.600 -999.990 -999.990 1.653 ..P WKT 2011 04 23 03 19 55 31.3200 -97.3300 251.000 122.0 172.242 4.310 -999.990 -999.990 1.722 ..P WKT 2011 04 23 03 24 55 31.3200 -97.3300 251.000 457.0 169.698 4.390 -999.990 -999.990 1.697 ..P WKT 2011 04 23 03 29 55 31.3200 -97.3300 251.000 30.0 165.659 4.440 -999.990 -999.990 1.657 ..P WKT 2011 04 23 03 34 55 31.3200 -97.3300 251.000 122.0 174.246 3.780 -999.990 -999.990 1.742 ..P WKT 2011 04 23 03 39 55 31.3200 -97.3300 251.000 457.0 173.696 3.660 -999.990 -999.990 1.737 ..P WKT 2011 04 23 03 49 55 31.3200 -97.3300 251.000 30.0 172.406 4.130 -999.990 -999.990 1.724 ..P WKT 2011 04 23 03 54 55 31.3200 -97.3300 251.000 122.0 171.666 4.110 -999.990 -999.990 1.717 ..P WKT 2011 04 23 03 59 55 31.3200 -97.3300 251.000 457.0 170.926 3.870 -999.990 -999.990 1.709 ..P WKT 2011 04 23 04 04 55 31.3200 -97.3300 251.000 30.0 162.544 3.530 -999.990 -999.990 1.625 ..P WKT 2011 04 23 04 09 55 31.3200 -97.3300 251.000 122.0 170.775 3.770 -999.990 -999.990 1.708 ..P WKT 2011 04 23 04 14 55 31.3200 -97.3300 251.000 457.0 167.710 4.570 -999.990 -999.990 1.677 ..P WKT 2011 04 23 04 24 55 31.3200 -97.3300 251.000 30.0 161.482 3.840 -999.990 -999.990 1.615 ..P WKT 2011 04 23 04 29 55 31.3200 -97.3300 251.000 122.0 164.966 4.600 -999.990 -999.990 1.650 ..P WKT 2011 04 23 04 34 55 31.3200 -97.3300 251.000 457.0 170.113 4.340 -999.990 -999.990 1.701 ..P WKT 2011 04 23 04 39 55 31.3200 -97.3300 251.000 30.0 162.964 3.900 -999.990 -999.990 1.630 ..P WKT 2011 04 23 04 44 55 31.3200 -97.3300 251.000 122.0 171.433 4.140 -999.990 -999.990 1.714 ..P WKT 2011 04 23 04 49 55 31.3200 -97.3300 251.000 457.0 170.930 4.020 -999.990 -999.990 1.709 ..P WKT 2011 04 23 05 04 55 31.3200 -97.3300 251.000 30.0 161.287 3.610 -999.990 -999.990 1.613 ..P WKT 2011 04 23 05 09 55 31.3200 -97.3300 251.000 122.0 165.688 3.650 -999.990 -999.990 1.657 ..P WKT 2011 04 23 05 14 55 31.3200 -97.3300 251.000 457.0 167.763 4.070 -999.990 -999.990 1.678 ..P WKT 2011 04 23 05 19 55 31.3200 -97.3300 251.000 30.0 160.867 3.680 -999.990 -999.990 1.609 ..P WKT 2011 04 23 05 24 55 31.3200 -97.3300 251.000 122.0 170.254 3.520 -999.990 -999.990 1.703 ..P WKT 2011 04 23 05 29 55 31.3200 -97.3300 251.000 457.0 170.335 3.860 -999.990 -999.990 1.703 ..P WKT 2011 04 23 05 39 55 31.3200 -97.3300 251.000 30.0 163.980 4.890 -999.990 -999.990 1.640 ..P WKT 2011 04 23 05 44 55 31.3200 -97.3300 251.000 122.0 162.362 3.740 -999.990 -999.990 1.624 ..P WKT 2011 04 23 05 49 55 31.3200 -97.3300 251.000 457.0 167.888 3.870 -999.990 -999.990 1.679 ..P WKT 2011 04 23 05 54 55 31.3200 -97.3300 251.000 30.0 171.088 6.060 -999.990 -999.990 1.711 ..P WKT 2011 04 23 05 59 55 31.3200 -97.3300 251.000 122.0 163.488 3.570 -999.990 -999.990 1.635 ..P WKT 2011 04 23 06 04 55 31.3200 -97.3300 251.000 457.0 173.334 5.460 -999.990 -999.990 1.733 ..P WKT 2011 04 23 06 14 55 31.3200 -97.3300 251.000 30.0 171.711 3.920 -999.990 -999.990 1.717 ..P WKT 2011 04 23 06 19 55 31.3200 -97.3300 251.000 122.0 168.550 3.480 -999.990 -999.990 1.686 ..P WKT 2011 04 23 06 24 55 31.3200 -97.3300 251.000 457.0 177.851 3.270 -999.990 -999.990 1.779 ..P WKT 2011 04 23 06 29 55 31.3200 -97.3300 251.000 30.0 169.206 4.440 -999.990 -999.990 1.692 ..P WKT 2011 04 23 06 34 55 31.3200 -97.3300 251.000 122.0 175.682 3.140 -999.990 -999.990 1.757 ..P WKT 2011 04 23 06 39 55 31.3200 -97.3300 251.000 457.0 175.678 5.180 -999.990 -999.990 1.757 ..P WKT 2011 04 23 06 49 55 31.3200 -97.3300 251.000 30.0 173.035 3.870 -999.990 -999.990 1.730 ..P WKT 2011 04 23 06 54 55 31.3200 -97.3300 251.000 122.0 175.712 5.140 -999.990 -999.990 1.757 ..P WKT 2011 04 23 06 59 55 31.3200 -97.3300 251.000 457.0 176.397 3.420 -999.990 -999.990 1.764 ..P WKT 2011 04 23 07 04 55 31.3200 -97.3300 251.000 30.0 173.259 4.470 -999.990 -999.990 1.733 ..P WKT 2011 04 23 07 09 55 31.3200 -97.3300 251.000 122.0 176.269 3.390 -999.990 -999.990 1.763 ..P WKT 2011 04 23 07 14 55 31.3200 -97.3300 251.000 457.0 178.117 3.910 -999.990 -999.990 1.781 ..P WKT 2011 04 23 07 24 55 31.3200 -97.3300 251.000 30.0 175.094 4.090 -999.990 -999.990 1.751 ..P WKT 2011 04 23 07 29 55 31.3200 -97.3300 251.000 122.0 179.861 3.900 -999.990 -999.990 1.799 ..P WKT 2011 04 23 07 34 55 31.3200 -97.3300 251.000 457.0 187.620 4.100 -999.990 -999.990 1.876 ..P WKT 2011 04 23 07 39 55 31.3200 -97.3300 251.000 30.0 178.760 3.450 -999.990 -999.990 1.788 ..P WKT 2011 04 23 07 44 55 31.3200 -97.3300 251.000 122.0 185.854 3.560 -999.990 -999.990 1.859 ..P WKT 2011 04 23 07 49 55 31.3200 -97.3300 251.000 457.0 184.972 3.110 -999.990 -999.990 1.850 ..P WKT 2011 04 23 07 59 55 31.3200 -97.3300 251.000 30.0 188.192 3.790 -999.990 -999.990 1.882 ..P WKT 2011 04 23 08 04 55 31.3200 -97.3300 251.000 122.0 180.661 3.770 -999.990 -999.990 1.807 ..P WKT 2011 04 23 08 09 55 31.3200 -97.3300 251.000 457.0 188.753 3.340 -999.990 -999.990 1.888 ..P WKT 2011 04 23 08 14 55 31.3200 -97.3300 251.000 30.0 189.200 4.300 -999.990 -999.990 1.892 ..P WKT 2011 04 23 08 19 55 31.3200 -97.3300 251.000 122.0 184.661 3.590 -999.990 -999.990 1.847 ..P WKT 2011 04 23 08 24 55 31.3200 -97.3300 251.000 457.0 191.091 4.100 -999.990 -999.990 1.911 ..P WKT 2011 04 23 08 34 55 31.3200 -97.3300 251.000 30.0 182.678 4.370 -999.990 -999.990 1.827 ..P WKT 2011 04 23 08 39 55 31.3200 -97.3300 251.000 122.0 184.454 3.530 -999.990 -999.990 1.845 ..P WKT 2011 04 23 08 44 55 31.3200 -97.3300 251.000 457.0 186.231 3.390 -999.990 -999.990 1.862 ..P WKT 2011 04 23 08 49 55 31.3200 -97.3300 251.000 30.0 182.689 4.190 -999.990 -999.990 1.827 ..P WKT 2011 04 23 08 54 55 31.3200 -97.3300 251.000 122.0 185.463 5.080 -999.990 -999.990 1.855 ..P WKT 2011 04 23 08 59 55 31.3200 -97.3300 251.000 457.0 180.591 3.200 -999.990 -999.990 1.806 ..P WKT 2011 04 23 09 09 55 31.3200 -97.3300 251.000 30.0 184.239 2.800 -999.990 -999.990 1.842 ..P WKT 2011 04 23 09 14 55 31.3200 -97.3300 251.000 122.0 185.446 3.520 -999.990 -999.990 1.854 ..P WKT 2011 04 23 09 19 55 31.3200 -97.3300 251.000 457.0 187.649 4.170 -999.990 -999.990 1.876 ..P WKT 2011 04 23 09 24 55 31.3200 -97.3300 251.000 30.0 184.868 4.430 -999.990 -999.990 1.849 ..P WKT 2011 04 23 09 29 55 31.3200 -97.3300 251.000 122.0 185.409 3.750 -999.990 -999.990 1.854 ..P WKT 2011 04 23 09 34 55 31.3200 -97.3300 251.000 457.0 187.447 3.060 -999.990 -999.990 1.874 ..P WKT 2011 04 23 09 44 55 31.3200 -97.3300 251.000 30.0 182.238 3.830 -999.990 -999.990 1.822 ..P WKT 2011 04 23 09 49 55 31.3200 -97.3300 251.000 122.0 186.294 3.640 -999.990 -999.990 1.863 ..P WKT 2011 04 23 09 54 55 31.3200 -97.3300 251.000 457.0 182.371 4.110 -999.990 -999.990 1.824 ..P WKT 2011 04 23 09 59 55 31.3200 -97.3300 251.000 30.0 184.600 4.320 -999.990 -999.990 1.846 ..P WKT 2011 04 23 10 04 55 31.3200 -97.3300 251.000 122.0 187.824 3.990 -999.990 -999.990 1.878 ..P WKT 2011 04 23 10 09 55 31.3200 -97.3300 251.000 457.0 177.253 5.120 -999.990 -999.990 1.773 ..P WKT 2011 04 23 10 19 55 31.3200 -97.3300 251.000 30.0 186.339 2.920 -999.990 -999.990 1.863 ..P WKT 2011 04 23 10 24 55 31.3200 -97.3300 251.000 122.0 186.549 4.140 -999.990 -999.990 1.865 ..P WKT 2011 04 23 10 29 55 31.3200 -97.3300 251.000 457.0 178.780 4.160 -999.990 -999.990 1.788 ..P WKT 2011 04 23 10 34 55 31.3200 -97.3300 251.000 30.0 179.488 3.750 -999.990 -999.990 1.795 ..P WKT 2011 04 23 10 39 55 31.3200 -97.3300 251.000 122.0 183.188 2.790 -999.990 -999.990 1.832 ..P WKT 2011 04 23 10 44 55 31.3200 -97.3300 251.000 457.0 177.912 5.280 -999.990 -999.990 1.779 ..P WKT 2011 04 23 10 54 55 31.3200 -97.3300 251.000 30.0 178.830 2.930 -999.990 -999.990 1.788 ..P WKT 2011 04 23 10 59 55 31.3200 -97.3300 251.000 122.0 181.034 2.560 -999.990 -999.990 1.810 ..P WKT 2011 04 23 11 04 55 31.3200 -97.3300 251.000 457.0 170.938 4.650 -999.990 -999.990 1.709 ..P WKT 2011 04 23 11 09 55 31.3200 -97.3300 251.000 30.0 180.123 4.460 -999.990 -999.990 1.801 ..P WKT 2011 04 23 11 14 55 31.3200 -97.3300 251.000 122.0 180.664 2.850 -999.990 -999.990 1.807 ..P WKT 2011 04 23 11 19 55 31.3200 -97.3300 251.000 457.0 180.707 2.570 -999.990 -999.990 1.807 ..P WKT 2011 04 23 11 29 55 31.3200 -97.3300 251.000 30.0 172.978 5.470 -999.990 -999.990 1.730 ..P WKT 2011 04 23 11 34 55 31.3200 -97.3300 251.000 122.0 179.169 2.570 -999.990 -999.990 1.792 ..P WKT 2011 04 23 11 39 55 31.3200 -97.3300 251.000 457.0 179.042 4.360 -999.990 -999.990 1.790 ..P WKT 2011 04 23 11 44 55 31.3200 -97.3300 251.000 30.0 171.603 2.730 -999.990 -999.990 1.716 ..P WKT 2011 04 23 11 49 55 31.3200 -97.3300 251.000 122.0 180.786 3.360 -999.990 -999.990 1.808 ..P WKT 2011 04 23 12 09 55 31.3200 -97.3300 251.000 457.0 185.635 2.360 -999.990 -999.990 1.856 ..P WKT 2011 04 23 12 10 25 31.3200 -97.3300 251.000 457.0 185.896 2.320 -999.990 -999.990 1.859 ..P WKT 2011 04 23 12 10 55 31.3200 -97.3300 251.000 457.0 182.501 2.500 -999.990 -999.990 1.825 ..P WKT 2011 04 23 12 11 25 31.3200 -97.3300 251.000 457.0 183.094 2.250 -999.990 -999.990 1.831 ..P WKT 2011 04 23 12 11 55 31.3200 -97.3300 251.000 457.0 183.022 2.410 -999.990 -999.990 1.830 ..P WKT 2011 04 23 12 12 25 31.3200 -97.3300 251.000 457.0 185.610 2.410 -999.990 -999.990 1.856 ..P WKT 2011 04 23 12 12 55 31.3200 -97.3300 251.000 457.0 185.539 2.440 -999.990 -999.990 1.855 ..P WKT 2011 04 23 12 13 25 31.3200 -97.3300 251.000 457.0 182.808 3.290 -999.990 -999.990 1.828 ..P WKT 2011 04 23 12 13 55 31.3200 -97.3300 251.000 457.0 180.743 3.090 -999.990 -999.990 1.807 ..P WKT 2011 04 23 12 14 25 31.3200 -97.3300 251.000 457.0 182.666 2.660 -999.990 -999.990 1.827 ..P WKT 2011 04 23 12 14 55 31.3200 -97.3300 251.000 457.0 183.259 3.210 -999.990 -999.990 1.833 ..P WKT 2011 04 23 12 19 55 31.3200 -97.3300 251.000 30.0 180.552 3.910 -999.990 -999.990 1.806 ..P WKT 2011 04 23 12 24 55 31.3200 -97.3300 251.000 122.0 180.172 2.940 -999.990 -999.990 1.802 ..P WKT 2011 04 23 12 29 55 31.3200 -97.3300 251.000 457.0 177.798 3.430 -999.990 -999.990 1.778 ..P WKT 2011 04 23 12 34 55 31.3200 -97.3300 251.000 30.0 175.756 3.950 -999.990 -999.990 1.758 ..P WKT 2011 04 23 12 39 55 31.3200 -97.3300 251.000 122.0 180.360 2.740 -999.990 -999.990 1.804 ..P WKT 2011 04 23 12 44 55 31.3200 -97.3300 251.000 457.0 173.669 2.500 -999.990 -999.990 1.737 ..P WKT 2011 04 23 12 54 55 31.3200 -97.3300 251.000 30.0 171.618 2.840 -999.990 -999.990 1.716 ..P WKT 2011 04 23 12 59 55 31.3200 -97.3300 251.000 122.0 173.268 3.820 -999.990 -999.990 1.733 ..P WKT 2011 04 23 13 04 55 31.3200 -97.3300 251.000 457.0 177.241 3.650 -999.990 -999.990 1.772 ..P WKT 2011 04 23 13 09 55 31.3200 -97.3300 251.000 30.0 172.582 3.410 -999.990 -999.990 1.726 ..P WKT 2011 04 23 13 14 55 31.3200 -97.3300 251.000 122.0 178.878 3.630 -999.990 -999.990 1.789 ..P WKT 2011 04 23 13 19 55 31.3200 -97.3300 251.000 457.0 177.208 3.710 -999.990 -999.990 1.772 ..P WKT 2011 04 23 13 29 55 31.3200 -97.3300 251.000 30.0 171.734 2.920 -999.990 -999.990 1.717 ..P WKT 2011 04 23 13 34 55 31.3200 -97.3300 251.000 122.0 178.383 2.430 -999.990 -999.990 1.784 ..P WKT 2011 04 23 13 39 55 31.3200 -97.3300 251.000 457.0 175.244 3.240 -999.990 -999.990 1.752 ..P WKT 2011 04 23 13 44 55 31.3200 -97.3300 251.000 30.0 172.935 2.450 -999.990 -999.990 1.729 ..P WKT 2011 04 23 13 49 55 31.3200 -97.3300 251.000 122.0 174.275 3.030 -999.990 -999.990 1.743 ..P WKT 2011 04 23 13 54 55 31.3200 -97.3300 251.000 457.0 174.123 2.740 -999.990 -999.990 1.741 ..P WKT 2011 04 23 14 04 55 31.3200 -97.3300 251.000 30.0 174.812 2.410 -999.990 -999.990 1.748 ..P WKT 2011 04 23 14 09 55 31.3200 -97.3300 251.000 122.0 177.809 2.330 -999.990 -999.990 1.778 ..P WKT 2011 04 23 14 14 55 31.3200 -97.3300 251.000 457.0 175.501 3.320 -999.990 -999.990 1.755 ..P WKT 2011 04 23 14 19 55 31.3200 -97.3300 251.000 30.0 177.337 2.520 -999.990 -999.990 1.773 ..P WKT 2011 04 23 14 24 55 31.3200 -97.3300 251.000 122.0 176.522 2.790 -999.990 -999.990 1.765 ..P WKT 2011 04 23 14 29 55 31.3200 -97.3300 251.000 457.0 176.202 2.450 -999.990 -999.990 1.762 ..P WKT 2011 04 23 14 39 55 31.3200 -97.3300 251.000 30.0 172.347 4.260 -999.990 -999.990 1.723 ..P WKT 2011 04 23 14 44 55 31.3200 -97.3300 251.000 122.0 178.253 2.810 -999.990 -999.990 1.783 ..P WKT 2011 04 23 14 49 55 31.3200 -97.3300 251.000 457.0 177.532 2.770 -999.990 -999.990 1.775 ..P WKT 2011 04 23 14 54 55 31.3200 -97.3300 251.000 30.0 176.315 2.620 -999.990 -999.990 1.763 ..P WKT 2011 04 23 14 59 55 31.3200 -97.3300 251.000 122.0 177.084 2.620 -999.990 -999.990 1.771 ..P WKT 2011 04 23 15 04 55 31.3200 -97.3300 251.000 457.0 174.873 2.800 -999.990 -999.990 1.749 ..P WKT 2011 04 23 15 14 55 31.3200 -97.3300 251.000 30.0 180.481 4.280 -999.990 -999.990 1.805 ..P WKT 2011 04 23 15 19 55 31.3200 -97.3300 251.000 122.0 184.987 2.480 -999.990 -999.990 1.850 ..P WKT 2011 04 23 15 24 55 31.3200 -97.3300 251.000 457.0 179.063 3.060 -999.990 -999.990 1.791 ..P WKT 2011 04 23 15 29 55 31.3200 -97.3300 251.000 30.0 181.416 3.380 -999.990 -999.990 1.814 ..P WKT 2011 04 23 15 34 55 31.3200 -97.3300 251.000 122.0 181.452 2.170 -999.990 -999.990 1.815 ..P WKT 2011 04 23 15 39 55 31.3200 -97.3300 251.000 457.0 172.884 5.030 -999.990 -999.990 1.729 ..P WKT 2011 04 23 15 49 55 31.3200 -97.3300 251.000 30.0 174.612 2.230 -999.990 -999.990 1.746 ..P WKT 2011 04 23 15 54 55 31.3200 -97.3300 251.000 122.0 176.303 2.120 -999.990 -999.990 1.763 ..P WKT 2011 04 23 15 59 55 31.3200 -97.3300 251.000 457.0 178.654 2.720 -999.990 -999.990 1.787 ..P WKT 2011 04 23 16 04 55 31.3200 -97.3300 251.000 30.0 174.060 2.290 -999.990 -999.990 1.741 ..P WKT 2011 04 23 16 09 55 31.3200 -97.3300 251.000 122.0 173.435 3.400 -999.990 -999.990 1.734 ..P WKT 2011 04 23 16 14 55 31.3200 -97.3300 251.000 457.0 174.133 2.280 -999.990 -999.990 1.741 ..P WKT 2011 04 23 16 24 55 31.3200 -97.3300 251.000 30.0 173.451 2.280 -999.990 -999.990 1.735 ..P WKT 2011 04 23 16 29 55 31.3200 -97.3300 251.000 122.0 172.070 2.820 -999.990 -999.990 1.721 ..P WKT 2011 04 23 16 34 55 31.3200 -97.3300 251.000 457.0 171.683 2.450 -999.990 -999.990 1.717 ..P WKT 2011 04 23 16 39 55 31.3200 -97.3300 251.000 30.0 174.930 2.650 -999.990 -999.990 1.749 ..P WKT 2011 04 23 16 44 55 31.3200 -97.3300 251.000 122.0 176.525 2.300 -999.990 -999.990 1.765 ..P WKT 2011 04 23 16 49 55 31.3200 -97.3300 251.000 457.0 170.518 2.570 -999.990 -999.990 1.705 ..P WKT 2011 04 23 17 04 55 31.3200 -97.3300 251.000 30.0 172.671 2.430 -999.990 -999.990 1.727 ..P WKT 2011 04 23 17 09 55 31.3200 -97.3300 251.000 122.0 176.748 3.590 -999.990 -999.990 1.767 ..P WKT 2011 04 23 17 14 55 31.3200 -97.3300 251.000 457.0 176.861 3.510 -999.990 -999.990 1.769 ..P WKT 2011 04 23 17 19 55 31.3200 -97.3300 251.000 30.0 175.983 2.630 -999.990 -999.990 1.760 ..P WKT 2011 04 23 17 24 55 31.3200 -97.3300 251.000 122.0 179.233 3.410 -999.990 -999.990 1.792 ..P WKT 2011 04 23 17 29 55 31.3200 -97.3300 251.000 457.0 171.422 3.000 -999.990 -999.990 1.714 ..P WKT 2011 04 23 17 39 55 31.3200 -97.3300 251.000 30.0 167.398 3.240 -999.990 -999.990 1.674 ..P WKT 2011 04 23 17 44 55 31.3200 -97.3300 251.000 122.0 166.397 5.730 -999.990 -999.990 1.664 ..P WKT 2011 04 23 17 49 55 31.3200 -97.3300 251.000 457.0 163.582 2.870 -999.990 -999.990 1.636 ..P WKT 2011 04 23 17 54 55 31.3200 -97.3300 251.000 30.0 162.913 2.880 -999.990 -999.990 1.629 ..P WKT 2011 04 23 17 59 55 31.3200 -97.3300 251.000 122.0 163.068 2.550 -999.990 -999.990 1.631 ..P WKT 2011 04 23 18 04 55 31.3200 -97.3300 251.000 457.0 158.604 2.200 -999.990 -999.990 1.586 ..P WKT 2011 04 23 18 14 55 31.3200 -97.3300 251.000 30.0 158.822 2.270 -999.990 -999.990 1.588 ..P WKT 2011 04 23 18 19 55 31.3200 -97.3300 251.000 122.0 163.172 4.180 -999.990 -999.990 1.632 ..P WKT 2011 04 23 18 24 55 31.3200 -97.3300 251.000 457.0 158.121 3.680 -999.990 -999.990 1.581 ..P WKT 2011 04 23 18 29 55 31.3200 -97.3300 251.000 30.0 157.852 2.350 -999.990 -999.990 1.579 ..P WKT 2011 04 23 18 34 55 31.3200 -97.3300 251.000 122.0 158.409 2.910 -999.990 -999.990 1.584 ..P WKT 2011 04 23 18 39 55 31.3200 -97.3300 251.000 457.0 150.722 2.330 -999.990 -999.990 1.507 ..P WKT 2011 04 23 18 49 55 31.3200 -97.3300 251.000 30.0 154.074 3.590 -999.990 -999.990 1.541 ..P WKT 2011 04 23 18 54 55 31.3200 -97.3300 251.000 122.0 157.032 4.970 -999.990 -999.990 1.570 ..P WKT 2011 04 23 18 59 55 31.3200 -97.3300 251.000 457.0 155.045 3.700 -999.990 -999.990 1.550 ..P WKT 2011 04 23 19 04 55 31.3200 -97.3300 251.000 30.0 151.411 3.900 -999.990 -999.990 1.514 ..P WKT 2011 04 23 19 09 55 31.3200 -97.3300 251.000 122.0 149.261 4.200 -999.990 -999.990 1.493 ..P WKT 2011 04 23 19 14 55 31.3200 -97.3300 251.000 457.0 153.701 4.520 -999.990 -999.990 1.537 ..P WKT 2011 04 23 19 24 55 31.3200 -97.3300 251.000 30.0 148.978 4.500 -999.990 -999.990 1.490 ..P WKT 2011 04 23 19 29 55 31.3200 -97.3300 251.000 122.0 154.147 4.270 -999.990 -999.990 1.541 ..P WKT 2011 04 23 19 34 55 31.3200 -97.3300 251.000 457.0 150.751 3.980 -999.990 -999.990 1.508 ..P WKT 2011 04 23 19 39 55 31.3200 -97.3300 251.000 30.0 149.660 3.290 -999.990 -999.990 1.497 ..P WKT 2011 04 23 19 44 55 31.3200 -97.3300 251.000 122.0 153.510 3.160 -999.990 -999.990 1.535 ..P WKT 2011 04 23 19 49 55 31.3200 -97.3300 251.000 457.0 150.444 2.910 -999.990 -999.990 1.504 ..P WKT 2011 04 23 19 59 55 31.3200 -97.3300 251.000 30.0 148.923 2.230 -999.990 -999.990 1.489 ..P WKT 2011 04 23 20 04 55 31.3200 -97.3300 251.000 122.0 157.379 2.610 -999.990 -999.990 1.574 ..P WKT 2011 04 23 20 09 55 31.3200 -97.3300 251.000 457.0 154.314 3.030 -999.990 -999.990 1.543 ..P WKT 2011 04 23 20 14 55 31.3200 -97.3300 251.000 30.0 154.211 3.080 -999.990 -999.990 1.542 ..P WKT 2011 04 23 20 19 55 31.3200 -97.3300 251.000 122.0 151.806 2.380 -999.990 -999.990 1.518 ..P WKT 2011 04 23 20 24 55 31.3200 -97.3300 251.000 457.0 149.729 2.040 -999.990 -999.990 1.497 ..P WKT 2011 04 23 20 34 55 31.3200 -97.3300 251.000 30.0 146.377 2.360 -999.990 -999.990 1.464 ..P WKT 2011 04 23 20 39 55 31.3200 -97.3300 251.000 122.0 147.074 2.700 -999.990 -999.990 1.471 ..P WKT 2011 04 23 20 44 55 31.3200 -97.3300 251.000 457.0 142.838 2.320 -999.990 -999.990 1.428 ..P WKT 2011 04 23 20 49 55 31.3200 -97.3300 251.000 30.0 140.247 4.430 -999.990 -999.990 1.402 ..P WKT 2011 04 23 20 54 55 31.3200 -97.3300 251.000 122.0 150.808 2.560 -999.990 -999.990 1.508 ..P WKT 2011 04 23 20 59 55 31.3200 -97.3300 251.000 457.0 142.628 3.000 -999.990 -999.990 1.426 ..P WKT 2011 04 23 21 09 55 31.3200 -97.3300 251.000 30.0 142.050 2.530 -999.990 -999.990 1.421 ..P WKT 2011 04 23 21 14 55 31.3200 -97.3300 251.000 122.0 147.349 2.450 -999.990 -999.990 1.473 ..P WKT 2011 04 23 21 19 55 31.3200 -97.3300 251.000 457.0 142.623 2.400 -999.990 -999.990 1.426 ..P WKT 2011 04 23 21 24 55 31.3200 -97.3300 251.000 30.0 138.555 2.960 -999.990 -999.990 1.386 ..P WKT 2011 04 23 21 29 55 31.3200 -97.3300 251.000 122.0 147.466 2.450 -999.990 -999.990 1.475 ..P WKT 2011 04 23 21 34 55 31.3200 -97.3300 251.000 457.0 142.906 2.900 -999.990 -999.990 1.429 ..P WKT 2011 04 23 21 44 55 31.3200 -97.3300 251.000 30.0 137.401 2.600 -999.990 -999.990 1.374 ..P WKT 2011 04 23 21 49 55 31.3200 -97.3300 251.000 122.0 141.547 3.170 -999.990 -999.990 1.415 ..P WKT 2011 04 23 21 54 55 31.3200 -97.3300 251.000 457.0 129.436 3.090 -999.990 -999.990 1.294 ..P WKT 2011 04 23 21 59 55 31.3200 -97.3300 251.000 30.0 135.880 3.940 -999.990 -999.990 1.359 ..P WKT 2011 04 23 22 04 55 31.3200 -97.3300 251.000 122.0 140.516 3.880 -999.990 -999.990 1.405 ..P WKT 2011 04 23 22 09 55 31.3200 -97.3300 251.000 457.0 136.781 2.810 -999.990 -999.990 1.368 ..P WKT 2011 04 23 22 19 55 31.3200 -97.3300 251.000 30.0 135.220 2.860 -999.990 -999.990 1.352 ..P WKT 2011 04 23 22 24 55 31.3200 -97.3300 251.000 122.0 140.184 3.810 -999.990 -999.990 1.402 ..P WKT 2011 04 23 22 29 55 31.3200 -97.3300 251.000 457.0 133.496 3.860 -999.990 -999.990 1.335 ..P WKT 2011 04 23 22 34 55 31.3200 -97.3300 251.000 30.0 140.428 4.760 -999.990 -999.990 1.404 ..P WKT 2011 04 23 22 39 55 31.3200 -97.3300 251.000 122.0 141.288 4.110 -999.990 -999.990 1.413 ..P WKT 2011 04 23 22 44 55 31.3200 -97.3300 251.000 457.0 138.539 3.710 -999.990 -999.990 1.385 ..P WKT 2011 04 23 22 54 55 31.3200 -97.3300 251.000 30.0 139.087 3.170 -999.990 -999.990 1.391 ..P WKT 2011 04 23 22 59 55 31.3200 -97.3300 251.000 122.0 144.351 3.960 -999.990 -999.990 1.444 ..P WKT 2011 04 23 23 04 55 31.3200 -97.3300 251.000 457.0 139.613 5.300 -999.990 -999.990 1.396 ..P WKT 2011 04 23 23 09 55 31.3200 -97.3300 251.000 30.0 138.317 4.250 -999.990 -999.990 1.383 ..P WKT 2011 04 23 23 14 55 31.3200 -97.3300 251.000 122.0 143.579 3.000 -999.990 -999.990 1.436 ..P WKT 2011 04 23 23 19 55 31.3200 -97.3300 251.000 457.0 141.629 2.880 -999.990 -999.990 1.416 ..P WKT 2011 04 23 23 29 55 31.3200 -97.3300 251.000 30.0 137.622 2.700 -999.990 -999.990 1.376 ..P WKT 2011 04 23 23 34 55 31.3200 -97.3300 251.000 122.0 140.975 2.770 -999.990 -999.990 1.410 ..P WKT 2011 04 23 23 39 55 31.3200 -97.3300 251.000 457.0 139.411 3.500 -999.990 -999.990 1.394 ..P WKT 2011 04 23 23 44 55 31.3200 -97.3300 251.000 30.0 137.848 3.640 -999.990 -999.990 1.378 ..P WKT 2011 04 23 23 49 55 31.3200 -97.3300 251.000 122.0 139.561 3.090 -999.990 -999.990 1.396 ..P WKT 2011 04 24 00 09 55 31.3200 -97.3300 251.000 457.0 140.611 2.430 -999.990 -999.990 1.406 ..P WKT 2011 04 24 00 10 25 31.3200 -97.3300 251.000 457.0 138.893 1.860 -999.990 -999.990 1.389 ..P WKT 2011 04 24 00 10 55 31.3200 -97.3300 251.000 457.0 141.761 2.980 -999.990 -999.990 1.418 ..P WKT 2011 04 24 00 11 25 31.3200 -97.3300 251.000 457.0 143.645 2.000 -999.990 -999.990 1.436 ..P WKT 2011 04 24 00 11 55 31.3200 -97.3300 251.000 457.0 148.805 2.950 -999.990 -999.990 1.488 ..P WKT 2011 04 24 00 12 25 31.3200 -97.3300 251.000 457.0 145.121 2.780 -999.990 -999.990 1.451 ..P WKT 2011 04 24 00 12 55 31.3200 -97.3300 251.000 457.0 142.421 2.160 -999.990 -999.990 1.424 ..P WKT 2011 04 24 00 13 25 31.3200 -97.3300 251.000 457.0 149.546 3.060 -999.990 -999.990 1.495 ..P WKT 2011 04 24 00 13 55 31.3200 -97.3300 251.000 457.0 141.277 3.750 -999.990 -999.990 1.413 ..P WKT 2011 04 24 00 14 25 31.3200 -97.3300 251.000 457.0 137.266 2.280 -999.990 -999.990 1.373 ..P WKT 2011 04 24 00 14 55 31.3200 -97.3300 251.000 457.0 141.115 2.610 -999.990 -999.990 1.411 ..P WKT 2011 04 24 00 19 55 31.3200 -97.3300 251.000 30.0 144.239 3.320 -999.990 -999.990 1.442 ..P WKT 2011 04 24 00 24 55 31.3200 -97.3300 251.000 122.0 146.053 3.020 -999.990 -999.990 1.461 ..P WKT 2011 04 24 00 29 55 31.3200 -97.3300 251.000 457.0 140.006 3.370 -999.990 -999.990 1.400 ..P WKT 2011 04 24 00 34 55 31.3200 -97.3300 251.000 30.0 134.614 3.140 -999.990 -999.990 1.346 ..P WKT 2011 04 24 00 39 55 31.3200 -97.3300 251.000 122.0 136.755 4.030 -999.990 -999.990 1.368 ..P WKT 2011 04 24 00 44 55 31.3200 -97.3300 251.000 457.0 139.552 3.790 -999.990 -999.990 1.396 ..P WKT 2011 04 24 00 54 55 31.3200 -97.3300 251.000 30.0 134.786 4.410 -999.990 -999.990 1.348 ..P WKT 2011 04 24 00 59 55 31.3200 -97.3300 251.000 122.0 140.652 3.480 -999.990 -999.990 1.407 ..P WKT 2011 04 24 01 04 55 31.3200 -97.3300 251.000 457.0 136.693 3.750 -999.990 -999.990 1.367 ..P WKT 2011 04 24 01 09 55 31.3200 -97.3300 251.000 30.0 132.405 2.980 -999.990 -999.990 1.324 ..P WKT 2011 04 24 01 14 55 31.3200 -97.3300 251.000 122.0 135.980 2.660 -999.990 -999.990 1.360 ..P WKT 2011 04 24 01 19 55 31.3200 -97.3300 251.000 457.0 134.313 4.060 -999.990 -999.990 1.343 ..P WKT 2011 04 24 01 29 55 31.3200 -97.3300 251.000 30.0 136.500 2.510 -999.990 -999.990 1.365 ..P WKT 2011 04 24 01 34 55 31.3200 -97.3300 251.000 122.0 137.734 2.480 -999.990 -999.990 1.377 ..P WKT 2011 04 24 01 39 55 31.3200 -97.3300 251.000 457.0 132.581 3.090 -999.990 -999.990 1.326 ..P WKT 2011 04 24 01 44 55 31.3200 -97.3300 251.000 30.0 134.962 3.360 -999.990 -999.990 1.350 ..P WKT 2011 04 24 01 49 55 31.3200 -97.3300 251.000 122.0 131.611 3.350 -999.990 -999.990 1.316 ..P WKT 2011 04 24 01 54 55 31.3200 -97.3300 251.000 457.0 131.208 2.490 -999.990 -999.990 1.312 ..P WKT 2011 04 24 02 04 55 31.3200 -97.3300 251.000 30.0 136.132 3.090 -999.990 -999.990 1.361 ..P WKT 2011 04 24 02 09 55 31.3200 -97.3300 251.000 122.0 133.272 3.360 -999.990 -999.990 1.333 ..P WKT 2011 04 24 02 14 55 31.3200 -97.3300 251.000 457.0 132.378 3.590 -999.990 -999.990 1.324 ..P WKT 2011 04 24 02 19 55 31.3200 -97.3300 251.000 30.0 127.061 4.540 -999.990 -999.990 1.271 ..P WKT 2011 04 24 02 24 55 31.3200 -97.3300 251.000 122.0 133.700 2.910 -999.990 -999.990 1.337 ..P WKT 2011 04 24 02 29 55 31.3200 -97.3300 251.000 457.0 122.162 3.100 -999.990 -999.990 1.222 ..P WKT 2011 04 24 02 39 55 31.3200 -97.3300 251.000 30.0 131.576 3.270 -999.990 -999.990 1.316 ..P WKT 2011 04 24 02 44 55 31.3200 -97.3300 251.000 122.0 133.372 3.030 -999.990 -999.990 1.334 ..P WKT 2011 04 24 02 49 55 31.3200 -97.3300 251.000 457.0 129.764 2.740 -999.990 -999.990 1.298 ..P WKT 2011 04 24 02 54 55 31.3200 -97.3300 251.000 30.0 126.975 3.190 -999.990 -999.990 1.270 ..P WKT 2011 04 24 02 59 55 31.3200 -97.3300 251.000 122.0 131.717 3.750 -999.990 -999.990 1.317 ..P WKT 2011 04 24 03 04 55 31.3200 -97.3300 251.000 457.0 126.472 3.580 -999.990 -999.990 1.265 ..P WKT 2011 04 24 03 14 55 31.3200 -97.3300 251.000 30.0 130.694 3.280 -999.990 -999.990 1.307 ..P WKT 2011 04 24 03 19 55 31.3200 -97.3300 251.000 122.0 133.120 3.440 -999.990 -999.990 1.331 ..P WKT 2011 04 24 03 24 55 31.3200 -97.3300 251.000 457.0 125.560 3.850 -999.990 -999.990 1.256 ..P WKT 2011 04 24 03 29 55 31.3200 -97.3300 251.000 30.0 126.841 2.910 -999.990 -999.990 1.268 ..P WKT 2011 04 24 03 34 55 31.3200 -97.3300 251.000 122.0 134.015 2.830 -999.990 -999.990 1.340 ..P WKT 2011 04 24 03 39 55 31.3200 -97.3300 251.000 457.0 124.163 3.750 -999.990 -999.990 1.242 ..P WKT 2011 04 24 03 49 55 31.3200 -97.3300 251.000 30.0 126.046 3.310 -999.990 -999.990 1.260 ..P WKT 2011 04 24 03 54 55 31.3200 -97.3300 251.000 122.0 132.215 2.350 -999.990 -999.990 1.322 ..P WKT 2011 04 24 03 59 55 31.3200 -97.3300 251.000 457.0 132.818 4.150 -999.990 -999.990 1.328 ..P WKT 2011 04 24 04 04 55 31.3200 -97.3300 251.000 30.0 124.251 1.900 -999.990 -999.990 1.243 ..P WKT 2011 04 24 04 09 55 31.3200 -97.3300 251.000 122.0 136.314 3.410 -999.990 -999.990 1.363 ..P WKT 2011 04 24 04 14 55 31.3200 -97.3300 251.000 457.0 140.845 2.360 -999.990 -999.990 1.408 ..P WKT 2011 04 24 04 24 55 31.3200 -97.3300 251.000 30.0 137.231 2.020 -999.990 -999.990 1.372 ..P WKT 2011 04 24 04 29 55 31.3200 -97.3300 251.000 122.0 136.291 2.160 -999.990 -999.990 1.363 ..P WKT 2011 04 24 04 34 55 31.3200 -97.3300 251.000 457.0 135.022 3.610 -999.990 -999.990 1.350 ..P WKT 2011 04 24 04 39 55 31.3200 -97.3300 251.000 30.0 133.425 2.680 -999.990 -999.990 1.334 ..P WKT 2011 04 24 04 44 55 31.3200 -97.3300 251.000 122.0 139.360 2.940 -999.990 -999.990 1.394 ..P WKT 2011 04 24 04 49 55 31.3200 -97.3300 251.000 457.0 140.056 4.200 -999.990 -999.990 1.401 ..P WKT 2011 04 24 05 04 55 31.3200 -97.3300 251.000 30.0 136.689 3.630 -999.990 -999.990 1.367 ..P WKT 2011 04 24 05 09 55 31.3200 -97.3300 251.000 122.0 143.824 3.270 -999.990 -999.990 1.438 ..P WKT 2011 04 24 05 14 55 31.3200 -97.3300 251.000 457.0 138.682 4.110 -999.990 -999.990 1.387 ..P WKT 2011 04 24 05 19 55 31.3200 -97.3300 251.000 30.0 146.145 3.360 -999.990 -999.990 1.461 ..P WKT 2011 04 24 05 24 55 31.3200 -97.3300 251.000 122.0 149.025 2.990 -999.990 -999.990 1.490 ..P WKT 2011 04 24 05 29 55 31.3200 -97.3300 251.000 457.0 147.811 3.500 -999.990 -999.990 1.478 ..P WKT 2011 04 24 05 39 55 31.3200 -97.3300 251.000 30.0 147.972 3.020 -999.990 -999.990 1.480 ..P WKT 2011 04 24 05 44 55 31.3200 -97.3300 251.000 122.0 145.744 3.330 -999.990 -999.990 1.457 ..P WKT 2011 04 24 05 49 55 31.3200 -97.3300 251.000 457.0 151.211 3.390 -999.990 -999.990 1.512 ..P WKT 2011 04 24 05 54 55 31.3200 -97.3300 251.000 30.0 144.564 3.490 -999.990 -999.990 1.446 ..P WKT 2011 04 24 05 59 55 31.3200 -97.3300 251.000 122.0 152.649 4.380 -999.990 -999.990 1.526 ..P WKT 2011 04 24 06 04 55 31.3200 -97.3300 251.000 457.0 149.111 5.210 -999.990 -999.990 1.491 ..P WKT 2011 04 24 06 14 55 31.3200 -97.3300 251.000 30.0 146.153 4.720 -999.990 -999.990 1.462 ..P WKT 2011 04 24 06 19 55 31.3200 -97.3300 251.000 122.0 151.152 3.950 -999.990 -999.990 1.512 ..P WKT 2011 04 24 06 24 55 31.3200 -97.3300 251.000 457.0 148.129 3.310 -999.990 -999.990 1.481 ..P WKT 2011 04 24 06 29 55 31.3200 -97.3300 251.000 30.0 141.997 3.970 -999.990 -999.990 1.420 ..P WKT 2011 04 24 06 34 55 31.3200 -97.3300 251.000 122.0 149.614 3.300 -999.990 -999.990 1.496 ..P WKT 2011 04 24 06 39 55 31.3200 -97.3300 251.000 457.0 147.247 3.340 -999.990 -999.990 1.472 ..P WKT 2011 04 24 06 49 55 31.3200 -97.3300 251.000 30.0 146.182 2.760 -999.990 -999.990 1.462 ..P WKT 2011 04 24 06 54 55 31.3200 -97.3300 251.000 122.0 153.870 2.690 -999.990 -999.990 1.539 ..P WKT 2011 04 24 06 59 55 31.3200 -97.3300 251.000 457.0 148.135 3.580 -999.990 -999.990 1.481 ..P WKT 2011 04 24 07 04 55 31.3200 -97.3300 251.000 30.0 150.912 3.390 -999.990 -999.990 1.509 ..P WKT 2011 04 24 07 09 55 31.3200 -97.3300 251.000 122.0 155.488 3.150 -999.990 -999.990 1.555 ..P WKT 2011 04 24 07 14 55 31.3200 -97.3300 251.000 457.0 157.937 2.490 -999.990 -999.990 1.579 ..P WKT 2011 04 24 07 24 55 31.3200 -97.3300 251.000 30.0 153.951 2.290 -999.990 -999.990 1.540 ..P WKT 2011 04 24 07 29 55 31.3200 -97.3300 251.000 122.0 157.499 4.370 -999.990 -999.990 1.575 ..P WKT 2011 04 24 07 34 55 31.3200 -97.3300 251.000 457.0 156.464 3.710 -999.990 -999.990 1.565 ..P WKT 2011 04 24 07 39 55 31.3200 -97.3300 251.000 30.0 153.793 3.750 -999.990 -999.990 1.538 ..P WKT 2011 04 24 07 44 55 31.3200 -97.3300 251.000 122.0 154.722 3.460 -999.990 -999.990 1.547 ..P WKT 2011 04 24 07 49 55 31.3200 -97.3300 251.000 457.0 147.795 4.560 -999.990 -999.990 1.478 ..P WKT 2011 04 24 07 59 55 31.3200 -97.3300 251.000 30.0 151.103 4.190 -999.990 -999.990 1.511 ..P WKT 2011 04 24 08 04 55 31.3200 -97.3300 251.000 122.0 157.411 3.410 -999.990 -999.990 1.574 ..P WKT 2011 04 24 08 09 55 31.3200 -97.3300 251.000 457.0 165.681 3.630 -999.990 -999.990 1.657 ..P WKT 2011 04 24 08 14 55 31.3200 -97.3300 251.000 30.0 152.676 4.720 -999.990 -999.990 1.527 ..P WKT 2011 04 24 08 19 55 31.3200 -97.3300 251.000 122.0 162.910 3.960 -999.990 -999.990 1.629 ..P WKT 2011 04 24 08 24 55 31.3200 -97.3300 251.000 457.0 165.288 2.820 -999.990 -999.990 1.653 ..P WKT 2011 04 24 08 34 55 31.3200 -97.3300 251.000 30.0 156.650 2.590 -999.990 -999.990 1.567 ..P WKT 2011 04 24 08 39 55 31.3200 -97.3300 251.000 122.0 169.525 4.720 -999.990 -999.990 1.695 ..P WKT 2011 04 24 08 44 55 31.3200 -97.3300 251.000 457.0 168.982 5.170 -999.990 -999.990 1.690 ..P WKT 2011 04 24 08 49 55 31.3200 -97.3300 251.000 30.0 154.037 4.130 -999.990 -999.990 1.540 ..P WKT 2011 04 24 08 54 55 31.3200 -97.3300 251.000 122.0 159.384 3.740 -999.990 -999.990 1.594 ..P WKT 2011 04 24 08 59 55 31.3200 -97.3300 251.000 457.0 178.478 2.800 -999.990 -999.990 1.785 ..P WKT 2011 04 24 09 09 55 31.3200 -97.3300 251.000 30.0 151.418 2.690 -999.990 -999.990 1.514 ..P WKT 2011 04 24 09 14 55 31.3200 -97.3300 251.000 122.0 158.122 4.510 -999.990 -999.990 1.581 ..P WKT 2011 04 24 09 19 55 31.3200 -97.3300 251.000 457.0 170.062 3.830 -999.990 -999.990 1.701 ..P WKT 2011 04 24 09 24 55 31.3200 -97.3300 251.000 30.0 156.145 4.380 -999.990 -999.990 1.561 ..P WKT 2011 04 24 09 29 55 31.3200 -97.3300 251.000 122.0 162.194 3.580 -999.990 -999.990 1.622 ..P WKT 2011 04 24 09 34 55 31.3200 -97.3300 251.000 457.0 176.752 5.180 -999.990 -999.990 1.768 ..P WKT 2011 04 24 09 44 55 31.3200 -97.3300 251.000 30.0 155.024 3.680 -999.990 -999.990 1.550 ..P WKT 2011 04 24 09 49 55 31.3200 -97.3300 251.000 122.0 163.082 3.560 -999.990 -999.990 1.631 ..P WKT 2011 04 24 09 54 55 31.3200 -97.3300 251.000 457.0 170.323 4.020 -999.990 -999.990 1.703 ..P WKT 2011 04 24 09 59 55 31.3200 -97.3300 251.000 30.0 163.327 3.670 -999.990 -999.990 1.633 ..P WKT 2011 04 24 10 04 55 31.3200 -97.3300 251.000 122.0 156.168 3.490 -999.990 -999.990 1.562 ..P WKT 2011 04 24 10 09 55 31.3200 -97.3300 251.000 457.0 182.880 3.050 -999.990 -999.990 1.829 ..P WKT 2011 04 24 10 19 55 31.3200 -97.3300 251.000 30.0 162.602 2.920 -999.990 -999.990 1.626 ..P WKT 2011 04 24 10 24 55 31.3200 -97.3300 251.000 122.0 162.081 2.840 -999.990 -999.990 1.621 ..P WKT 2011 04 24 10 29 55 31.3200 -97.3300 251.000 457.0 184.469 3.400 -999.990 -999.990 1.845 ..P WKT 2011 04 24 10 34 55 31.3200 -97.3300 251.000 30.0 154.496 4.200 -999.990 -999.990 1.545 ..P WKT 2011 04 24 10 39 55 31.3200 -97.3300 251.000 122.0 155.940 2.840 -999.990 -999.990 1.559 ..P WKT 2011 04 24 10 44 55 31.3200 -97.3300 251.000 457.0 176.853 3.770 -999.990 -999.990 1.769 ..P WKT 2011 04 24 10 54 55 31.3200 -97.3300 251.000 30.0 154.402 3.050 -999.990 -999.990 1.544 ..P WKT 2011 04 24 10 59 55 31.3200 -97.3300 251.000 122.0 149.160 2.950 -999.990 -999.990 1.492 ..P WKT 2011 04 24 11 04 55 31.3200 -97.3300 251.000 457.0 166.171 3.280 -999.990 -999.990 1.662 ..P WKT 2011 04 24 11 09 55 31.3200 -97.3300 251.000 30.0 154.385 4.090 -999.990 -999.990 1.544 ..P WKT 2011 04 24 11 14 55 31.3200 -97.3300 251.000 122.0 155.033 3.920 -999.990 -999.990 1.550 ..P WKT 2011 04 24 11 19 55 31.3200 -97.3300 251.000 457.0 166.808 2.870 -999.990 -999.990 1.668 ..P WKT 2011 04 24 11 29 55 31.3200 -97.3300 251.000 30.0 148.144 2.800 -999.990 -999.990 1.481 ..P WKT 2011 04 24 11 34 55 31.3200 -97.3300 251.000 122.0 155.336 3.470 -999.990 -999.990 1.553 ..P WKT 2011 04 24 11 39 55 31.3200 -97.3300 251.000 457.0 181.509 4.390 -999.990 -999.990 1.815 ..P WKT 2011 04 24 11 44 55 31.3200 -97.3300 251.000 30.0 150.417 5.260 -999.990 -999.990 1.504 ..P WKT 2011 04 24 11 49 55 31.3200 -97.3300 251.000 122.0 155.318 3.830 -999.990 -999.990 1.553 ..P WKT 2011 04 24 12 09 55 31.3200 -97.3300 251.000 457.0 182.894 2.500 -999.990 -999.990 1.829 ..P WKT 2011 04 24 12 10 25 31.3200 -97.3300 251.000 457.0 183.194 2.530 -999.990 -999.990 1.832 ..P WKT 2011 04 24 12 10 55 31.3200 -97.3300 251.000 457.0 179.240 3.780 -999.990 -999.990 1.792 ..P WKT 2011 04 24 12 11 25 31.3200 -97.3300 251.000 457.0 180.196 4.940 -999.990 -999.990 1.802 ..P WKT 2011 04 24 12 11 55 31.3200 -97.3300 251.000 457.0 185.734 2.680 -999.990 -999.990 1.857 ..P WKT 2011 04 24 12 12 25 31.3200 -97.3300 251.000 457.0 181.452 3.160 -999.990 -999.990 1.815 ..P WKT 2011 04 24 12 12 55 31.3200 -97.3300 251.000 457.0 182.408 3.230 -999.990 -999.990 1.824 ..P WKT 2011 04 24 12 13 25 31.3200 -97.3300 251.000 457.0 175.507 4.350 -999.990 -999.990 1.755 ..P WKT 2011 04 24 12 13 55 31.3200 -97.3300 251.000 457.0 175.809 2.900 -999.990 -999.990 1.758 ..P WKT 2011 04 24 12 14 25 31.3200 -97.3300 251.000 457.0 179.711 3.920 -999.990 -999.990 1.797 ..P WKT 2011 04 24 12 14 55 31.3200 -97.3300 251.000 457.0 178.702 3.810 -999.990 -999.990 1.787 ..P WKT 2011 04 24 12 19 55 31.3200 -97.3300 251.000 30.0 159.122 3.590 -999.990 -999.990 1.591 ..P WKT 2011 04 24 12 24 55 31.3200 -97.3300 251.000 122.0 161.475 4.160 -999.990 -999.990 1.615 ..P WKT 2011 04 24 12 29 55 31.3200 -97.3300 251.000 457.0 180.530 3.340 -999.990 -999.990 1.805 ..P WKT 2011 04 24 12 34 55 31.3200 -97.3300 251.000 30.0 156.029 2.550 -999.990 -999.990 1.560 ..P WKT 2011 04 24 12 39 55 31.3200 -97.3300 251.000 122.0 162.641 2.470 -999.990 -999.990 1.626 ..P WKT 2011 04 24 12 44 55 31.3200 -97.3300 251.000 457.0 186.293 4.890 -999.990 -999.990 1.863 ..P WKT 2011 04 24 12 54 55 31.3200 -97.3300 251.000 30.0 154.455 2.750 -999.990 -999.990 1.545 ..P WKT 2011 04 24 12 59 55 31.3200 -97.3300 251.000 122.0 161.877 2.280 -999.990 -999.990 1.619 ..P WKT 2011 04 24 13 04 55 31.3200 -97.3300 251.000 457.0 182.907 2.320 -999.990 -999.990 1.829 ..P WKT 2011 04 24 13 09 55 31.3200 -97.3300 251.000 30.0 154.104 2.420 -999.990 -999.990 1.541 ..P WKT 2011 04 24 13 14 55 31.3200 -97.3300 251.000 122.0 156.447 3.570 -999.990 -999.990 1.564 ..P WKT 2011 04 24 13 19 55 31.3200 -97.3300 251.000 457.0 188.965 3.240 -999.990 -999.990 1.890 ..P WKT 2011 04 24 13 29 55 31.3200 -97.3300 251.000 30.0 151.456 2.750 -999.990 -999.990 1.515 ..P WKT 2011 04 24 13 34 55 31.3200 -97.3300 251.000 122.0 159.824 3.430 -999.990 -999.990 1.598 ..P WKT 2011 04 24 13 39 55 31.3200 -97.3300 251.000 457.0 177.055 3.260 -999.990 -999.990 1.771 ..P WKT 2011 04 24 13 44 55 31.3200 -97.3300 251.000 30.0 156.216 2.290 -999.990 -999.990 1.562 ..P WKT 2011 04 24 13 49 55 31.3200 -97.3300 251.000 122.0 160.484 3.820 -999.990 -999.990 1.605 ..P WKT 2011 04 24 13 54 55 31.3200 -97.3300 251.000 457.0 165.738 2.880 -999.990 -999.990 1.657 ..P WKT 2011 04 24 14 04 55 31.3200 -97.3300 251.000 30.0 159.619 2.830 -999.990 -999.990 1.596 ..P WKT 2011 04 24 14 09 55 31.3200 -97.3300 251.000 122.0 165.650 3.320 -999.990 -999.990 1.657 ..P WKT 2011 04 24 14 14 55 31.3200 -97.3300 251.000 457.0 173.161 2.450 -999.990 -999.990 1.732 ..P WKT 2011 04 24 14 19 55 31.3200 -97.3300 251.000 30.0 164.574 3.220 -999.990 -999.990 1.646 ..P WKT 2011 04 24 14 24 55 31.3200 -97.3300 251.000 122.0 163.708 3.650 -999.990 -999.990 1.637 ..P WKT 2011 04 24 14 29 55 31.3200 -97.3300 251.000 457.0 175.001 3.610 -999.990 -999.990 1.750 ..P WKT 2011 04 24 14 39 55 31.3200 -97.3300 251.000 30.0 154.342 4.210 -999.990 -999.990 1.543 ..P WKT 2011 04 24 14 44 55 31.3200 -97.3300 251.000 122.0 152.299 4.790 -999.990 -999.990 1.523 ..P WKT 2011 04 24 14 49 55 31.3200 -97.3300 251.000 457.0 167.028 3.510 -999.990 -999.990 1.670 ..P WKT 2011 04 24 14 54 55 31.3200 -97.3300 251.000 30.0 154.625 4.600 -999.990 -999.990 1.546 ..P WKT 2011 04 24 14 59 55 31.3200 -97.3300 251.000 122.0 157.022 2.980 -999.990 -999.990 1.570 ..P WKT 2011 04 24 15 04 55 31.3200 -97.3300 251.000 457.0 163.862 2.900 -999.990 -999.990 1.639 ..P WKT 2011 04 24 15 14 55 31.3200 -97.3300 251.000 30.0 152.393 2.780 -999.990 -999.990 1.524 ..P WKT 2011 04 24 15 19 55 31.3200 -97.3300 251.000 122.0 153.827 3.000 -999.990 -999.990 1.538 ..P WKT 2011 04 24 15 24 55 31.3200 -97.3300 251.000 457.0 161.846 3.350 -999.990 -999.990 1.618 ..P WKT 2011 04 24 15 29 55 31.3200 -97.3300 251.000 30.0 143.526 3.450 -999.990 -999.990 1.435 ..P WKT 2011 04 24 15 34 55 31.3200 -97.3300 251.000 122.0 150.558 1.890 -999.990 -999.990 1.506 ..P WKT 2011 04 24 15 39 55 31.3200 -97.3300 251.000 457.0 151.005 2.890 -999.990 -999.990 1.510 ..P WKT 2011 04 24 15 49 55 31.3200 -97.3300 251.000 30.0 143.661 2.590 -999.990 -999.990 1.437 ..P WKT 2011 04 24 15 54 55 31.3200 -97.3300 251.000 122.0 147.073 1.970 -999.990 -999.990 1.471 ..P WKT 2011 04 24 15 59 55 31.3200 -97.3300 251.000 457.0 143.894 1.880 -999.990 -999.990 1.439 ..P WKT 2011 04 24 16 04 55 31.3200 -97.3300 251.000 30.0 146.648 1.830 -999.990 -999.990 1.466 ..P WKT 2011 04 24 16 09 55 31.3200 -97.3300 251.000 122.0 147.753 2.280 -999.990 -999.990 1.478 ..P WKT 2011 04 24 16 14 55 31.3200 -97.3300 251.000 457.0 150.508 2.370 -999.990 -999.990 1.505 ..P WKT 2011 04 24 16 24 55 31.3200 -97.3300 251.000 30.0 140.425 4.750 -999.990 -999.990 1.404 ..P WKT 2011 04 24 16 29 55 31.3200 -97.3300 251.000 122.0 136.488 2.950 -999.990 -999.990 1.365 ..P WKT 2011 04 24 16 34 55 31.3200 -97.3300 251.000 457.0 138.488 3.380 -999.990 -999.990 1.385 ..P WKT 2011 04 24 16 39 55 31.3200 -97.3300 251.000 30.0 134.551 3.370 -999.990 -999.990 1.346 ..P WKT 2011 04 24 16 44 55 31.3200 -97.3300 251.000 122.0 139.521 4.340 -999.990 -999.990 1.395 ..P WKT 2011 04 24 16 49 55 31.3200 -97.3300 251.000 457.0 138.552 4.440 -999.990 -999.990 1.386 ..P WKT 2011 04 24 17 04 55 31.3200 -97.3300 251.000 30.0 137.915 4.390 -999.990 -999.990 1.379 ..P WKT 2011 04 24 17 09 55 31.3200 -97.3300 251.000 122.0 146.090 4.610 -999.990 -999.990 1.461 ..P WKT 2011 04 24 17 14 55 31.3200 -97.3300 251.000 457.0 138.742 5.100 -999.990 -999.990 1.387 ..P WKT 2011 04 24 17 19 55 31.3200 -97.3300 251.000 30.0 143.286 2.640 -999.990 -999.990 1.433 ..P WKT 2011 04 24 17 24 55 31.3200 -97.3300 251.000 122.0 144.195 2.360 -999.990 -999.990 1.442 ..P WKT 2011 04 24 17 29 55 31.3200 -97.3300 251.000 457.0 139.984 2.240 -999.990 -999.990 1.400 ..P WKT 2011 04 24 17 39 55 31.3200 -97.3300 251.000 30.0 136.406 2.240 -999.990 -999.990 1.364 ..P WKT 2011 04 24 17 44 55 31.3200 -97.3300 251.000 122.0 147.290 3.200 -999.990 -999.990 1.473 ..P WKT 2011 04 24 17 49 55 31.3200 -97.3300 251.000 457.0 139.495 2.750 -999.990 -999.990 1.395 ..P WKT 2011 04 24 17 54 55 31.3200 -97.3300 251.000 30.0 137.816 3.100 -999.990 -999.990 1.378 ..P WKT 2011 04 24 17 59 55 31.3200 -97.3300 251.000 122.0 143.910 3.020 -999.990 -999.990 1.439 ..P WKT 2011 04 24 18 04 55 31.3200 -97.3300 251.000 457.0 143.885 3.610 -999.990 -999.990 1.439 ..P WKT 2011 04 24 18 14 55 31.3200 -97.3300 251.000 30.0 143.645 3.270 -999.990 -999.990 1.436 ..P WKT 2011 04 24 18 19 55 31.3200 -97.3300 251.000 122.0 145.913 4.190 -999.990 -999.990 1.459 ..P WKT 2011 04 24 18 24 55 31.3200 -97.3300 251.000 457.0 139.245 2.760 -999.990 -999.990 1.392 ..P WKT 2011 04 24 18 29 55 31.3200 -97.3300 251.000 30.0 137.871 2.730 -999.990 -999.990 1.379 ..P WKT 2011 04 24 18 34 55 31.3200 -97.3300 251.000 122.0 139.477 3.190 -999.990 -999.990 1.395 ..P WKT 2011 04 24 18 39 55 31.3200 -97.3300 251.000 457.0 130.817 4.090 -999.990 -999.990 1.308 ..P WKT 2011 04 24 18 49 55 31.3200 -97.3300 251.000 30.0 134.502 2.650 -999.990 -999.990 1.345 ..P WKT 2011 04 24 18 54 55 31.3200 -97.3300 251.000 122.0 137.245 3.600 -999.990 -999.990 1.372 ..P WKT 2011 04 24 18 59 55 31.3200 -97.3300 251.000 457.0 134.189 2.790 -999.990 -999.990 1.342 ..P WKT 2011 04 24 19 04 55 31.3200 -97.3300 251.000 30.0 133.784 4.620 -999.990 -999.990 1.338 ..P WKT 2011 04 24 19 09 55 31.3200 -97.3300 251.000 122.0 135.698 3.100 -999.990 -999.990 1.357 ..P WKT 2011 04 24 19 14 55 31.3200 -97.3300 251.000 457.0 135.957 2.090 -999.990 -999.990 1.360 ..P WKT 2011 04 24 19 24 55 31.3200 -97.3300 251.000 30.0 134.009 4.210 -999.990 -999.990 1.340 ..P WKT 2011 04 24 19 29 55 31.3200 -97.3300 251.000 122.0 142.417 3.620 -999.990 -999.990 1.424 ..P WKT 2011 04 24 19 34 55 31.3200 -97.3300 251.000 457.0 133.908 3.310 -999.990 -999.990 1.339 ..P WKT 2011 04 24 19 39 55 31.3200 -97.3300 251.000 30.0 132.697 4.720 -999.990 -999.990 1.327 ..P WKT 2011 04 24 19 44 55 31.3200 -97.3300 251.000 122.0 135.466 4.060 -999.990 -999.990 1.355 ..P WKT 2011 04 24 19 49 55 31.3200 -97.3300 251.000 457.0 132.264 3.320 -999.990 -999.990 1.323 ..P WKT 2011 04 24 19 59 55 31.3200 -97.3300 251.000 30.0 133.585 3.360 -999.990 -999.990 1.336 ..P WKT 2011 04 24 20 04 55 31.3200 -97.3300 251.000 122.0 137.116 3.790 -999.990 -999.990 1.371 ..P WKT 2011 04 24 20 09 55 31.3200 -97.3300 251.000 457.0 138.988 5.060 -999.990 -999.990 1.390 ..P WKT 2011 04 24 20 14 55 31.3200 -97.3300 251.000 30.0 141.191 5.030 -999.990 -999.990 1.412 ..P WKT 2011 04 24 20 19 55 31.3200 -97.3300 251.000 122.0 141.736 2.680 -999.990 -999.990 1.417 ..P WKT 2011 04 24 20 24 55 31.3200 -97.3300 251.000 457.0 128.659 2.310 -999.990 -999.990 1.287 ..P WKT 2011 04 24 20 34 55 31.3200 -97.3300 251.000 30.0 133.850 2.040 -999.990 -999.990 1.339 ..P WKT 2011 04 24 20 39 55 31.3200 -97.3300 251.000 122.0 134.511 2.550 -999.990 -999.990 1.345 ..P WKT 2011 04 24 20 44 55 31.3200 -97.3300 251.000 457.0 135.506 2.980 -999.990 -999.990 1.355 ..P WKT 2011 04 24 20 49 55 31.3200 -97.3300 251.000 30.0 129.186 2.980 -999.990 -999.990 1.292 ..P WKT 2011 04 24 20 54 55 31.3200 -97.3300 251.000 122.0 133.506 3.130 -999.990 -999.990 1.335 ..P WKT 2011 04 24 20 59 55 31.3200 -97.3300 251.000 457.0 126.519 3.380 -999.990 -999.990 1.265 ..P WKT 2011 04 24 21 09 55 31.3200 -97.3300 251.000 30.0 133.996 3.460 -999.990 -999.990 1.340 ..P WKT 2011 04 24 21 14 55 31.3200 -97.3300 251.000 122.0 140.648 3.450 -999.990 -999.990 1.406 ..P WKT 2011 04 24 21 19 55 31.3200 -97.3300 251.000 457.0 136.653 3.720 -999.990 -999.990 1.367 ..P WKT 2011 04 24 21 24 55 31.3200 -97.3300 251.000 30.0 144.639 5.050 -999.990 -999.990 1.446 ..P WKT 2011 04 24 21 29 55 31.3200 -97.3300 251.000 122.0 140.809 3.830 -999.990 -999.990 1.408 ..P WKT 2011 04 24 21 34 55 31.3200 -97.3300 251.000 457.0 145.135 4.740 -999.990 -999.990 1.451 ..P WKT 2011 04 24 21 44 55 31.3200 -97.3300 251.000 30.0 140.827 3.520 -999.990 -999.990 1.408 ..P WKT 2011 04 24 21 49 55 31.3200 -97.3300 251.000 122.0 147.510 3.810 -999.990 -999.990 1.475 ..P WKT 2011 04 24 21 54 55 31.3200 -97.3300 251.000 457.0 131.376 5.300 -999.990 -999.990 1.314 ..P WKT 2011 04 24 21 59 55 31.3200 -97.3300 251.000 30.0 128.232 6.370 -999.990 -999.990 1.282 ..P WKT 2011 04 24 22 04 55 31.3200 -97.3300 251.000 122.0 141.081 5.020 -999.990 -999.990 1.411 ..P WKT 2011 04 24 22 09 55 31.3200 -97.3300 251.000 457.0 131.772 3.950 -999.990 -999.990 1.318 ..P WKT 2011 04 24 22 19 55 31.3200 -97.3300 251.000 30.0 138.243 3.390 -999.990 -999.990 1.382 ..P WKT 2011 04 24 22 24 55 31.3200 -97.3300 251.000 122.0 137.692 5.220 -999.990 -999.990 1.377 ..P WKT 2011 04 24 22 29 55 31.3200 -97.3300 251.000 457.0 139.310 6.240 -999.990 -999.990 1.393 ..P WKT 2011 04 24 22 34 55 31.3200 -97.3300 251.000 30.0 137.593 5.270 -999.990 -999.990 1.376 ..P WKT 2011 04 24 22 39 55 31.3200 -97.3300 251.000 122.0 138.711 4.530 -999.990 -999.990 1.387 ..P WKT 2011 04 24 22 44 55 31.3200 -97.3300 251.000 457.0 139.995 5.550 -999.990 -999.990 1.400 ..P WKT 2011 04 24 22 54 55 31.3200 -97.3300 251.000 30.0 136.845 2.830 -999.990 -999.990 1.368 ..P WKT 2011 04 24 22 59 55 31.3200 -97.3300 251.000 122.0 136.747 6.120 -999.990 -999.990 1.367 ..P WKT 2011 04 24 23 04 55 31.3200 -97.3300 251.000 457.0 135.313 5.300 -999.990 -999.990 1.353 ..P WKT 2011 04 24 23 09 55 31.3200 -97.3300 251.000 30.0 128.872 4.710 -999.990 -999.990 1.289 ..P WKT 2011 04 24 23 14 55 31.3200 -97.3300 251.000 122.0 139.459 2.610 -999.990 -999.990 1.395 ..P WKT 2011 04 24 23 19 55 31.3200 -97.3300 251.000 457.0 137.358 2.880 -999.990 -999.990 1.374 ..P WKT 2011 04 24 23 29 55 31.3200 -97.3300 251.000 30.0 130.641 3.190 -999.990 -999.990 1.306 ..P WKT 2011 04 24 23 34 55 31.3200 -97.3300 251.000 122.0 138.723 2.270 -999.990 -999.990 1.387 ..P WKT 2011 04 24 23 39 55 31.3200 -97.3300 251.000 457.0 138.117 3.230 -999.990 -999.990 1.381 ..P WKT 2011 04 24 23 44 55 31.3200 -97.3300 251.000 30.0 136.510 2.760 -999.990 -999.990 1.365 ..P WKT 2011 04 24 23 49 55 31.3200 -97.3300 251.000 122.0 141.922 2.130 -999.990 -999.990 1.419 ..P WKT 2011 04 25 00 09 55 31.3200 -97.3300 251.000 457.0 149.698 3.490 -999.990 -999.990 1.497 ..P WKT 2011 04 25 00 10 25 31.3200 -97.3300 251.000 457.0 149.430 3.890 -999.990 -999.990 1.494 ..P WKT 2011 04 25 00 10 55 31.3200 -97.3300 251.000 457.0 144.146 2.070 -999.990 -999.990 1.441 ..P WKT 2011 04 25 00 11 25 31.3200 -97.3300 251.000 457.0 144.547 1.920 -999.990 -999.990 1.445 ..P WKT 2011 04 25 00 11 55 31.3200 -97.3300 251.000 457.0 146.284 1.940 -999.990 -999.990 1.463 ..P WKT 2011 04 25 00 12 25 31.3200 -97.3300 251.000 457.0 145.013 2.360 -999.990 -999.990 1.450 ..P WKT 2011 04 25 00 12 55 31.3200 -97.3300 251.000 457.0 147.085 2.520 -999.990 -999.990 1.471 ..P WKT 2011 04 25 00 13 25 31.3200 -97.3300 251.000 457.0 139.128 4.190 -999.990 -999.990 1.391 ..P WKT 2011 04 25 00 13 55 31.3200 -97.3300 251.000 457.0 139.863 2.540 -999.990 -999.990 1.399 ..P WKT 2011 04 25 00 14 25 31.3200 -97.3300 251.000 457.0 142.269 3.120 -999.990 -999.990 1.423 ..P WKT 2011 04 25 00 14 55 31.3200 -97.3300 251.000 457.0 151.361 2.160 -999.990 -999.990 1.514 ..P WKT 2011 04 25 00 19 55 31.3200 -97.3300 251.000 30.0 143.330 2.130 -999.990 -999.990 1.433 ..P WKT 2011 04 25 00 24 55 31.3200 -97.3300 251.000 122.0 149.671 3.340 -999.990 -999.990 1.497 ..P WKT 2011 04 25 00 29 55 31.3200 -97.3300 251.000 457.0 149.328 2.510 -999.990 -999.990 1.493 ..P WKT 2011 04 25 00 34 55 31.3200 -97.3300 251.000 30.0 139.631 3.630 -999.990 -999.990 1.396 ..P WKT 2011 04 25 00 39 55 31.3200 -97.3300 251.000 122.0 150.981 3.610 -999.990 -999.990 1.510 ..P WKT 2011 04 25 00 44 55 31.3200 -97.3300 251.000 457.0 153.978 3.170 -999.990 -999.990 1.540 ..P WKT 2011 04 25 00 54 55 31.3200 -97.3300 251.000 30.0 143.619 3.710 -999.990 -999.990 1.436 ..P WKT 2011 04 25 00 59 55 31.3200 -97.3300 251.000 122.0 154.471 3.030 -999.990 -999.990 1.545 ..P WKT 2011 04 25 01 04 55 31.3200 -97.3300 251.000 457.0 143.290 3.150 -999.990 -999.990 1.433 ..P WKT 2011 04 25 01 09 55 31.3200 -97.3300 251.000 30.0 149.133 3.800 -999.990 -999.990 1.491 ..P WKT 2011 04 25 01 14 55 31.3200 -97.3300 251.000 122.0 157.143 2.920 -999.990 -999.990 1.571 ..P WKT 2011 04 25 01 19 55 31.3200 -97.3300 251.000 457.0 149.471 3.520 -999.990 -999.990 1.495 ..P WKT 2011 04 25 01 29 55 31.3200 -97.3300 251.000 30.0 147.544 3.000 -999.990 -999.990 1.475 ..P WKT 2011 04 25 01 34 55 31.3200 -97.3300 251.000 122.0 148.785 3.070 -999.990 -999.990 1.488 ..P WKT 2011 04 25 01 39 55 31.3200 -97.3300 251.000 457.0 152.193 2.910 -999.990 -999.990 1.522 ..P WKT 2011 04 25 01 44 55 31.3200 -97.3300 251.000 30.0 149.598 4.510 -999.990 -999.990 1.496 ..P WKT 2011 04 25 01 49 55 31.3200 -97.3300 251.000 122.0 150.172 3.730 -999.990 -999.990 1.502 ..P WKT 2011 04 25 01 54 55 31.3200 -97.3300 251.000 457.0 152.078 3.180 -999.990 -999.990 1.521 ..P WKT 2011 04 25 02 04 55 31.3200 -97.3300 251.000 30.0 153.985 5.920 -999.990 -999.990 1.540 ..P WKT 2011 04 25 02 09 55 31.3200 -97.3300 251.000 122.0 157.318 3.390 -999.990 -999.990 1.573 ..P WKT 2011 04 25 02 14 55 31.3200 -97.3300 251.000 457.0 151.156 3.300 -999.990 -999.990 1.512 ..P WKT 2011 04 25 02 19 55 31.3200 -97.3300 251.000 30.0 153.822 3.350 -999.990 -999.990 1.538 ..P WKT 2011 04 25 02 24 55 31.3200 -97.3300 251.000 122.0 150.660 3.230 -999.990 -999.990 1.507 ..P WKT 2011 04 25 02 29 55 31.3200 -97.3300 251.000 457.0 142.171 2.300 -999.990 -999.990 1.422 ..P WKT 2011 04 25 02 39 55 31.3200 -97.3300 251.000 30.0 143.698 2.710 -999.990 -999.990 1.437 ..P WKT 2011 04 25 02 44 55 31.3200 -97.3300 251.000 122.0 151.212 2.770 -999.990 -999.990 1.512 ..P WKT 2011 04 25 02 49 55 31.3200 -97.3300 251.000 457.0 139.259 2.570 -999.990 -999.990 1.393 ..P WKT 2011 04 25 02 54 55 31.3200 -97.3300 251.000 30.0 140.783 3.550 -999.990 -999.990 1.408 ..P WKT 2011 04 25 02 59 55 31.3200 -97.3300 251.000 122.0 143.638 2.580 -999.990 -999.990 1.436 ..P WKT 2011 04 25 03 04 55 31.3200 -97.3300 251.000 457.0 146.159 2.730 -999.990 -999.990 1.462 ..P WKT 2011 04 25 03 14 55 31.3200 -97.3300 251.000 30.0 149.868 3.260 -999.990 -999.990 1.499 ..P WKT 2011 04 25 03 19 55 31.3200 -97.3300 251.000 122.0 145.405 3.180 -999.990 -999.990 1.454 ..P WKT 2011 04 25 03 24 55 31.3200 -97.3300 251.000 457.0 147.592 3.600 -999.990 -999.990 1.476 ..P WKT 2011 04 25 03 29 55 31.3200 -97.3300 251.000 30.0 141.802 3.170 -999.990 -999.990 1.418 ..P WKT 2011 04 25 03 34 55 31.3200 -97.3300 251.000 122.0 144.321 4.220 -999.990 -999.990 1.443 ..P WKT 2011 04 25 03 39 55 31.3200 -97.3300 251.000 457.0 156.142 2.510 -999.990 -999.990 1.561 ..P WKT 2011 04 25 03 49 55 31.3200 -97.3300 251.000 30.0 149.168 2.510 -999.990 -999.990 1.492 ..P WKT 2011 04 25 03 54 55 31.3200 -97.3300 251.000 122.0 145.659 2.690 -999.990 -999.990 1.457 ..P WKT 2011 04 25 03 59 55 31.3200 -97.3300 251.000 457.0 159.417 3.500 -999.990 -999.990 1.594 ..P WKT 2011 04 25 04 04 55 31.3200 -97.3300 251.000 30.0 147.608 2.890 -999.990 -999.990 1.476 ..P WKT 2011 04 25 04 09 55 31.3200 -97.3300 251.000 122.0 152.732 2.570 -999.990 -999.990 1.527 ..P WKT 2011 04 25 04 14 55 31.3200 -97.3300 251.000 457.0 165.819 3.120 -999.990 -999.990 1.658 ..P WKT 2011 04 25 04 24 55 31.3200 -97.3300 251.000 30.0 145.553 2.820 -999.990 -999.990 1.456 ..P WKT 2011 04 25 04 29 55 31.3200 -97.3300 251.000 122.0 146.717 2.710 -999.990 -999.990 1.467 ..P WKT 2011 04 25 04 34 55 31.3200 -97.3300 251.000 457.0 155.510 4.520 -999.990 -999.990 1.555 ..P WKT 2011 04 25 04 39 55 31.3200 -97.3300 251.000 30.0 149.375 3.560 -999.990 -999.990 1.494 ..P WKT 2011 04 25 04 44 55 31.3200 -97.3300 251.000 122.0 156.838 3.230 -999.990 -999.990 1.568 ..P WKT 2011 04 25 04 49 55 31.3200 -97.3300 251.000 457.0 154.684 4.150 -999.990 -999.990 1.547 ..P WKT 2011 04 25 05 04 55 31.3200 -97.3300 251.000 30.0 157.698 3.080 -999.990 -999.990 1.577 ..P WKT 2011 04 25 05 09 55 31.3200 -97.3300 251.000 122.0 158.459 3.000 -999.990 -999.990 1.585 ..P WKT 2011 04 25 05 14 55 31.3200 -97.3300 251.000 457.0 169.822 3.290 -999.990 -999.990 1.698 ..P WKT 2011 04 25 05 19 55 31.3200 -97.3300 251.000 30.0 160.477 3.420 -999.990 -999.990 1.605 ..P WKT 2011 04 25 05 24 55 31.3200 -97.3300 251.000 122.0 159.084 2.740 -999.990 -999.990 1.591 ..P WKT 2011 04 25 05 29 55 31.3200 -97.3300 251.000 457.0 167.462 3.240 -999.990 -999.990 1.675 ..P WKT 2011 04 25 05 39 55 31.3200 -97.3300 251.000 30.0 156.159 2.910 -999.990 -999.990 1.562 ..P WKT 2011 04 25 05 44 55 31.3200 -97.3300 251.000 122.0 154.694 5.070 -999.990 -999.990 1.547 ..P WKT 2011 04 25 05 49 55 31.3200 -97.3300 251.000 457.0 164.813 3.210 -999.990 -999.990 1.648 ..P WKT 2011 04 25 05 54 55 31.3200 -97.3300 251.000 30.0 156.563 4.070 -999.990 -999.990 1.566 ..P WKT 2011 04 25 05 59 55 31.3200 -97.3300 251.000 122.0 166.018 3.460 -999.990 -999.990 1.660 ..P WKT 2011 04 25 06 04 55 31.3200 -97.3300 251.000 457.0 175.799 4.390 -999.990 -999.990 1.758 ..P WKT 2011 04 25 06 14 55 31.3200 -97.3300 251.000 30.0 167.432 3.380 -999.990 -999.990 1.674 ..P WKT 2011 04 25 06 19 55 31.3200 -97.3300 251.000 122.0 168.305 4.580 -999.990 -999.990 1.683 ..P WKT 2011 04 25 06 24 55 31.3200 -97.3300 251.000 457.0 174.137 3.340 -999.990 -999.990 1.741 ..P WKT 2011 04 25 06 29 55 31.3200 -97.3300 251.000 30.0 162.117 3.560 -999.990 -999.990 1.621 ..P WKT 2011 04 25 06 34 55 31.3200 -97.3300 251.000 122.0 170.097 4.150 -999.990 -999.990 1.701 ..P WKT 2011 04 25 06 39 55 31.3200 -97.3300 251.000 457.0 173.777 4.340 -999.990 -999.990 1.738 ..P WKT 2011 04 25 06 49 55 31.3200 -97.3300 251.000 30.0 168.441 3.270 -999.990 -999.990 1.684 ..P WKT 2011 04 25 06 54 55 31.3200 -97.3300 251.000 122.0 171.649 4.190 -999.990 -999.990 1.716 ..P WKT 2011 04 25 06 59 55 31.3200 -97.3300 251.000 457.0 169.901 3.600 -999.990 -999.990 1.699 ..P WKT 2011 04 25 07 04 55 31.3200 -97.3300 251.000 30.0 176.079 3.610 -999.990 -999.990 1.761 ..P WKT 2011 04 25 07 09 55 31.3200 -97.3300 251.000 122.0 176.973 3.760 -999.990 -999.990 1.770 ..P WKT 2011 04 25 07 14 55 31.3200 -97.3300 251.000 457.0 180.838 3.970 -999.990 -999.990 1.808 ..P WKT 2011 04 25 07 24 55 31.3200 -97.3300 251.000 30.0 174.986 4.080 -999.990 -999.990 1.750 ..P WKT 2011 04 25 07 29 55 31.3200 -97.3300 251.000 122.0 179.131 4.700 -999.990 -999.990 1.791 ..P WKT 2011 04 25 07 34 55 31.3200 -97.3300 251.000 457.0 186.576 4.310 -999.990 -999.990 1.866 ..P WKT 2011 04 25 07 39 55 31.3200 -97.3300 251.000 30.0 175.545 4.430 -999.990 -999.990 1.755 ..P WKT 2011 04 25 07 44 55 31.3200 -97.3300 251.000 122.0 180.678 4.160 -999.990 -999.990 1.807 ..P WKT 2011 04 25 07 49 55 31.3200 -97.3300 251.000 457.0 191.417 4.450 -999.990 -999.990 1.914 ..P WKT 2011 04 25 07 59 55 31.3200 -97.3300 251.000 30.0 183.118 3.990 -999.990 -999.990 1.831 ..P WKT 2011 04 25 08 04 55 31.3200 -97.3300 251.000 122.0 188.483 5.360 -999.990 -999.990 1.885 ..P WKT 2011 04 25 08 09 55 31.3200 -97.3300 251.000 457.0 192.199 4.100 -999.990 -999.990 1.922 ..P WKT 2011 04 25 08 14 55 31.3200 -97.3300 251.000 30.0 188.333 4.500 -999.990 -999.990 1.883 ..P WKT 2011 04 25 08 19 55 31.3200 -97.3300 251.000 122.0 199.296 3.940 -999.990 -999.990 1.993 ..P WKT 2011 04 25 08 24 55 31.3200 -97.3300 251.000 457.0 201.031 3.940 -999.990 -999.990 2.010 ..P WKT 2011 04 25 08 34 55 31.3200 -97.3300 251.000 30.0 192.128 3.770 -999.990 -999.990 1.921 ..P WKT 2011 04 25 08 39 55 31.3200 -97.3300 251.000 122.0 193.016 3.860 -999.990 -999.990 1.930 ..P WKT 2011 04 25 08 44 55 31.3200 -97.3300 251.000 457.0 203.617 4.830 -999.990 -999.990 2.036 ..P WKT 2011 04 25 08 49 55 31.3200 -97.3300 251.000 30.0 198.085 4.020 -999.990 -999.990 1.981 ..P WKT 2011 04 25 08 54 55 31.3200 -97.3300 251.000 122.0 197.163 4.450 -999.990 -999.990 1.972 ..P WKT 2011 04 25 08 59 55 31.3200 -97.3300 251.000 457.0 209.075 4.060 -999.990 -999.990 2.091 ..P WKT 2011 04 25 09 09 55 31.3200 -97.3300 251.000 30.0 197.429 4.330 -999.990 -999.990 1.974 ..P WKT 2011 04 25 09 14 55 31.3200 -97.3300 251.000 122.0 204.636 4.340 -999.990 -999.990 2.046 ..P WKT 2011 04 25 09 19 55 31.3200 -97.3300 251.000 457.0 207.566 4.080 -999.990 -999.990 2.076 ..P WKT 2011 04 25 09 24 55 31.3200 -97.3300 251.000 30.0 200.794 4.590 -999.990 -999.990 2.008 ..P WKT 2011 04 25 09 29 55 31.3200 -97.3300 251.000 122.0 204.381 4.320 -999.990 -999.990 2.044 ..P WKT 2011 04 25 09 34 55 31.3200 -97.3300 251.000 457.0 208.625 4.510 -999.990 -999.990 2.086 ..P WKT 2011 04 25 09 44 55 31.3200 -97.3300 251.000 30.0 200.464 4.210 -999.990 -999.990 2.005 ..P WKT 2011 04 25 09 49 55 31.3200 -97.3300 251.000 122.0 206.303 5.050 -999.990 -999.990 2.063 ..P WKT 2011 04 25 09 54 55 31.3200 -97.3300 251.000 457.0 202.611 4.900 -999.990 -999.990 2.026 ..P WKT 2011 04 25 09 59 55 31.3200 -97.3300 251.000 30.0 200.728 4.200 -999.990 -999.990 2.007 ..P WKT 2011 04 25 10 04 55 31.3200 -97.3300 251.000 122.0 201.965 4.190 -999.990 -999.990 2.020 ..P WKT 2011 04 25 10 09 55 31.3200 -97.3300 251.000 457.0 210.262 4.360 -999.990 -999.990 2.103 ..P WKT 2011 04 25 10 19 55 31.3200 -97.3300 251.000 30.0 196.319 4.440 -999.990 -999.990 1.963 ..P WKT 2011 04 25 10 24 55 31.3200 -97.3300 251.000 122.0 201.495 4.770 -999.990 -999.990 2.015 ..P WKT 2011 04 25 10 29 55 31.3200 -97.3300 251.000 457.0 211.428 4.540 -999.990 -999.990 2.114 ..P WKT 2011 04 25 10 34 55 31.3200 -97.3300 251.000 30.0 205.936 4.460 -999.990 -999.990 2.059 ..P WKT 2011 04 25 10 39 55 31.3200 -97.3300 251.000 122.0 207.334 4.630 -999.990 -999.990 2.073 ..P WKT 2011 04 25 10 44 55 31.3200 -97.3300 251.000 457.0 210.702 5.990 -999.990 -999.990 2.107 ..P WKT 2011 04 25 10 54 55 31.3200 -97.3300 251.000 30.0 205.533 4.480 -999.990 -999.990 2.055 ..P WKT 2011 04 25 10 59 55 31.3200 -97.3300 251.000 122.0 201.920 4.700 -999.990 -999.990 2.019 ..P WKT 2011 04 25 11 04 55 31.3200 -97.3300 251.000 457.0 214.370 4.440 -999.990 -999.990 2.144 ..P WKT 2011 04 25 11 09 55 31.3200 -97.3300 251.000 30.0 212.068 4.990 -999.990 -999.990 2.121 ..P WKT 2011 04 25 11 14 55 31.3200 -97.3300 251.000 122.0 214.027 4.420 -999.990 -999.990 2.140 ..P WKT 2011 04 25 11 19 55 31.3200 -97.3300 251.000 457.0 218.278 4.510 -999.990 -999.990 2.183 ..P WKT 2011 04 25 11 29 55 31.3200 -97.3300 251.000 30.0 210.434 4.420 -999.990 -999.990 2.104 ..P WKT 2011 04 25 11 34 55 31.3200 -97.3300 251.000 122.0 215.701 7.180 -999.990 -999.990 2.157 ..P WKT 2011 04 25 11 39 55 31.3200 -97.3300 251.000 457.0 213.764 5.560 -999.990 -999.990 2.138 ..P WKT 2011 04 25 11 44 55 31.3200 -97.3300 251.000 30.0 215.428 5.550 -999.990 -999.990 2.154 ..P WKT 2011 04 25 11 49 55 31.3200 -97.3300 251.000 122.0 217.746 5.970 -999.990 -999.990 2.177 ..P WKT 2011 04 25 12 09 55 31.3200 -97.3300 251.000 457.0 218.957 5.030 -999.990 -999.990 2.190 ..P WKT 2011 04 25 12 10 25 31.3200 -97.3300 251.000 457.0 219.548 4.730 -999.990 -999.990 2.195 ..P WKT 2011 04 25 12 10 55 31.3200 -97.3300 251.000 457.0 217.520 4.850 -999.990 -999.990 2.175 ..P WKT 2011 04 25 12 11 25 31.3200 -97.3300 251.000 457.0 220.074 4.660 -999.990 -999.990 2.201 ..P WKT 2011 04 25 12 11 55 31.3200 -97.3300 251.000 457.0 222.957 4.600 -999.990 -999.990 2.230 ..P WKT 2011 04 25 12 12 25 31.3200 -97.3300 251.000 457.0 221.910 4.600 -999.990 -999.990 2.219 ..P WKT 2011 04 25 12 12 55 31.3200 -97.3300 251.000 457.0 219.555 4.600 -999.990 -999.990 2.196 ..P WKT 2011 04 25 12 13 25 31.3200 -97.3300 251.000 457.0 218.181 4.650 -999.990 -999.990 2.182 ..P WKT 2011 04 25 12 13 55 31.3200 -97.3300 251.000 457.0 214.842 5.250 -999.990 -999.990 2.148 ..P WKT 2011 04 25 12 14 25 31.3200 -97.3300 251.000 457.0 217.725 5.110 -999.990 -999.990 2.177 ..P WKT 2011 04 25 12 14 55 31.3200 -97.3300 251.000 457.0 216.678 5.500 -999.990 -999.990 2.167 ..P WKT 2011 04 25 12 19 55 31.3200 -97.3300 251.000 30.0 215.053 5.290 -999.990 -999.990 2.151 ..P WKT 2011 04 25 12 24 55 31.3200 -97.3300 251.000 122.0 219.324 5.290 -999.990 -999.990 2.193 ..P WKT 2011 04 25 12 29 55 31.3200 -97.3300 251.000 457.0 208.199 4.970 -999.990 -999.990 2.082 ..P WKT 2011 04 25 12 34 55 31.3200 -97.3300 251.000 30.0 215.091 5.580 -999.990 -999.990 2.151 ..P WKT 2011 04 25 12 39 55 31.3200 -97.3300 251.000 122.0 214.120 5.010 -999.990 -999.990 2.141 ..P WKT 2011 04 25 12 44 55 31.3200 -97.3300 251.000 457.0 208.724 4.600 -999.990 -999.990 2.087 ..P WKT 2011 04 25 12 54 55 31.3200 -97.3300 251.000 30.0 209.415 5.310 -999.990 -999.990 2.094 ..P WKT 2011 04 25 12 59 55 31.3200 -97.3300 251.000 122.0 214.359 4.940 -999.990 -999.990 2.144 ..P WKT 2011 04 25 13 04 55 31.3200 -97.3300 251.000 457.0 209.136 5.010 -999.990 -999.990 2.091 ..P WKT 2011 04 25 13 09 55 31.3200 -97.3300 251.000 30.0 211.785 5.010 -999.990 -999.990 2.118 ..P WKT 2011 04 25 13 14 55 31.3200 -97.3300 251.000 122.0 207.051 5.070 -999.990 -999.990 2.071 ..P WKT 2011 04 25 13 19 55 31.3200 -97.3300 251.000 457.0 204.449 4.790 -999.990 -999.990 2.044 ..P WKT 2011 04 25 13 29 55 31.3200 -97.3300 251.000 30.0 207.006 4.570 -999.990 -999.990 2.070 ..P WKT 2011 04 25 13 34 55 31.3200 -97.3300 251.000 122.0 204.614 4.660 -999.990 -999.990 2.046 ..P WKT 2011 04 25 13 39 55 31.3200 -97.3300 251.000 457.0 204.356 5.020 -999.990 -999.990 2.044 ..P WKT 2011 04 25 13 44 55 31.3200 -97.3300 251.000 30.0 205.904 4.490 -999.990 -999.990 2.059 ..P WKT 2011 04 25 13 49 55 31.3200 -97.3300 251.000 122.0 203.839 5.390 -999.990 -999.990 2.038 ..P WKT 2011 04 25 13 54 55 31.3200 -97.3300 251.000 457.0 199.964 5.220 -999.990 -999.990 2.000 ..P WKT 2011 04 25 14 04 55 31.3200 -97.3300 251.000 30.0 197.332 4.500 -999.990 -999.990 1.973 ..P WKT 2011 04 25 14 09 55 31.3200 -97.3300 251.000 122.0 208.936 4.760 -999.990 -999.990 2.089 ..P WKT 2011 04 25 14 14 55 31.3200 -97.3300 251.000 457.0 201.630 4.490 -999.990 -999.990 2.016 ..P WKT 2011 04 25 14 19 55 31.3200 -97.3300 251.000 30.0 203.039 4.870 -999.990 -999.990 2.030 ..P WKT 2011 04 25 14 24 55 31.3200 -97.3300 251.000 122.0 200.170 4.460 -999.990 -999.990 2.002 ..P WKT 2011 04 25 14 29 55 31.3200 -97.3300 251.000 457.0 205.366 4.850 -999.990 -999.990 2.054 ..P WKT 2011 04 25 14 39 55 31.3200 -97.3300 251.000 30.0 195.652 5.400 -999.990 -999.990 1.957 ..P WKT 2011 04 25 14 44 55 31.3200 -97.3300 251.000 122.0 197.862 4.400 -999.990 -999.990 1.979 ..P WKT 2011 04 25 14 49 55 31.3200 -97.3300 251.000 457.0 190.190 4.450 -999.990 -999.990 1.902 ..P WKT 2011 04 25 14 54 55 31.3200 -97.3300 251.000 30.0 195.364 4.530 -999.990 -999.990 1.954 ..P WKT 2011 04 25 14 59 55 31.3200 -97.3300 251.000 122.0 195.598 4.130 -999.990 -999.990 1.956 ..P WKT 2011 04 25 15 04 55 31.3200 -97.3300 251.000 457.0 191.217 4.350 -999.990 -999.990 1.912 ..P WKT 2011 04 25 15 14 55 31.3200 -97.3300 251.000 30.0 188.103 4.040 -999.990 -999.990 1.881 ..P WKT 2011 04 25 15 19 55 31.3200 -97.3300 251.000 122.0 191.680 4.180 -999.990 -999.990 1.917 ..P WKT 2011 04 25 15 24 55 31.3200 -97.3300 251.000 457.0 187.012 4.260 -999.990 -999.990 1.870 ..P WKT 2011 04 25 15 29 55 31.3200 -97.3300 251.000 30.0 189.932 4.470 -999.990 -999.990 1.899 ..P WKT 2011 04 25 15 34 55 31.3200 -97.3300 251.000 122.0 182.621 4.220 -999.990 -999.990 1.826 ..P WKT 2011 04 25 15 39 55 31.3200 -97.3300 251.000 457.0 185.541 4.030 -999.990 -999.990 1.855 ..P WKT 2011 04 25 15 49 55 31.3200 -97.3300 251.000 30.0 177.939 3.910 -999.990 -999.990 1.779 ..P WKT 2011 04 25 15 54 55 31.3200 -97.3300 251.000 122.0 176.330 4.170 -999.990 -999.990 1.763 ..P WKT 2011 04 25 15 59 55 31.3200 -97.3300 251.000 457.0 176.702 6.020 -999.990 -999.990 1.767 ..P WKT 2011 04 25 16 04 55 31.3200 -97.3300 251.000 30.0 181.369 6.110 -999.990 -999.990 1.814 ..P WKT 2011 04 25 16 09 55 31.3200 -97.3300 251.000 122.0 185.377 5.740 -999.990 -999.990 1.854 ..P WKT 2011 04 25 16 14 55 31.3200 -97.3300 251.000 457.0 181.124 4.520 -999.990 -999.990 1.811 ..P WKT 2011 04 25 16 24 55 31.3200 -97.3300 251.000 30.0 180.643 4.550 -999.990 -999.990 1.806 ..P WKT 2011 04 25 16 29 55 31.3200 -97.3300 251.000 122.0 181.441 5.480 -999.990 -999.990 1.814 ..P WKT 2011 04 25 16 34 55 31.3200 -97.3300 251.000 457.0 180.255 6.240 -999.990 -999.990 1.803 ..P WKT 2011 04 25 16 39 55 31.3200 -97.3300 251.000 30.0 183.700 6.000 -999.990 -999.990 1.837 ..P WKT 2011 04 25 16 44 55 31.3200 -97.3300 251.000 122.0 189.629 6.150 -999.990 -999.990 1.896 ..P WKT 2011 04 25 16 49 55 31.3200 -97.3300 251.000 457.0 192.415 6.260 -999.990 -999.990 1.924 ..P WKT 2011 04 25 17 04 55 31.3200 -97.3300 251.000 30.0 188.795 5.980 -999.990 -999.990 1.888 ..P WKT 2011 04 25 17 09 55 31.3200 -97.3300 251.000 122.0 195.277 5.780 -999.990 -999.990 1.953 ..P WKT 2011 04 25 17 14 55 31.3200 -97.3300 251.000 457.0 198.284 6.160 -999.990 -999.990 1.983 ..P WKT 2011 04 25 17 19 55 31.3200 -97.3300 251.000 30.0 190.357 6.160 -999.990 -999.990 1.904 ..P WKT 2011 04 25 17 24 55 31.3200 -97.3300 251.000 122.0 193.529 4.610 -999.990 -999.990 1.935 ..P WKT 2011 04 25 17 29 55 31.3200 -97.3300 251.000 457.0 182.614 4.320 -999.990 -999.990 1.826 ..P WKT 2011 04 25 17 39 55 31.3200 -97.3300 251.000 30.0 186.802 4.500 -999.990 -999.990 1.868 ..P WKT 2011 04 25 17 44 55 31.3200 -97.3300 251.000 122.0 187.485 4.900 -999.990 -999.990 1.875 ..P WKT 2011 04 25 17 49 55 31.3200 -97.3300 251.000 457.0 185.515 5.040 -999.990 -999.990 1.855 ..P WKT 2011 04 25 17 54 55 31.3200 -97.3300 251.000 30.0 189.019 5.270 -999.990 -999.990 1.890 ..P WKT 2011 04 25 17 59 55 31.3200 -97.3300 251.000 122.0 189.538 5.900 -999.990 -999.990 1.895 ..P WKT 2011 04 25 18 04 55 31.3200 -97.3300 251.000 457.0 194.703 5.900 -999.990 -999.990 1.947 ..P WKT 2011 04 25 18 14 55 31.3200 -97.3300 251.000 30.0 192.090 6.000 -999.990 -999.990 1.921 ..P WKT 2011 04 25 18 19 55 31.3200 -97.3300 251.000 122.0 202.740 6.130 -999.990 -999.990 2.027 ..P WKT 2011 04 25 18 24 55 31.3200 -97.3300 251.000 457.0 197.615 5.570 -999.990 -999.990 1.976 ..P WKT 2011 04 25 18 29 55 31.3200 -97.3300 251.000 30.0 197.969 4.630 -999.990 -999.990 1.980 ..P WKT 2011 04 25 18 34 55 31.3200 -97.3300 251.000 122.0 191.843 5.220 -999.990 -999.990 1.918 ..P WKT 2011 04 25 18 39 55 31.3200 -97.3300 251.000 457.0 193.859 4.650 -999.990 -999.990 1.939 ..P WKT 2011 04 25 18 49 55 31.3200 -97.3300 251.000 30.0 184.259 4.930 -999.990 -999.990 1.843 ..P WKT 2011 04 25 18 54 55 31.3200 -97.3300 251.000 122.0 190.764 4.300 -999.990 -999.990 1.908 ..P WKT 2011 04 25 18 59 55 31.3200 -97.3300 251.000 457.0 190.952 4.100 -999.990 -999.990 1.910 ..P WKT 2011 04 25 19 04 55 31.3200 -97.3300 251.000 30.0 194.134 4.750 -999.990 -999.990 1.941 ..P WKT 2011 04 25 19 09 55 31.3200 -97.3300 251.000 122.0 198.981 4.130 -999.990 -999.990 1.990 ..P WKT 2011 04 25 19 14 55 31.3200 -97.3300 251.000 457.0 188.186 4.570 -999.990 -999.990 1.882 ..P WKT 2011 04 25 19 24 55 31.3200 -97.3300 251.000 30.0 195.553 5.630 -999.990 -999.990 1.956 ..P WKT 2011 04 25 19 29 55 31.3200 -97.3300 251.000 122.0 193.743 4.170 -999.990 -999.990 1.937 ..P WKT 2011 04 25 19 34 55 31.3200 -97.3300 251.000 457.0 194.931 4.340 -999.990 -999.990 1.949 ..P WKT 2011 04 25 19 39 55 31.3200 -97.3300 251.000 30.0 196.118 4.700 -999.990 -999.990 1.961 ..P WKT 2011 04 25 19 44 55 31.3200 -97.3300 251.000 122.0 200.306 5.130 -999.990 -999.990 2.003 ..P WKT 2011 04 25 19 49 55 31.3200 -97.3300 251.000 457.0 197.496 5.580 -999.990 -999.990 1.975 ..P WKT 2011 04 25 19 59 55 31.3200 -97.3300 251.000 30.0 204.495 5.760 -999.990 -999.990 2.045 ..P WKT 2011 04 25 20 04 55 31.3200 -97.3300 251.000 122.0 206.973 5.920 -999.990 -999.990 2.070 ..P WKT 2011 04 25 20 09 55 31.3200 -97.3300 251.000 457.0 205.448 7.240 -999.990 -999.990 2.054 ..P WKT 2011 04 25 20 14 55 31.3200 -97.3300 251.000 30.0 205.925 5.120 -999.990 -999.990 2.059 ..P WKT 2011 04 25 20 19 55 31.3200 -97.3300 251.000 122.0 210.740 4.500 -999.990 -999.990 2.107 ..P WKT 2011 04 25 20 24 55 31.3200 -97.3300 251.000 457.0 209.549 4.620 -999.990 -999.990 2.095 ..P WKT 2011 04 25 20 34 55 31.3200 -97.3300 251.000 30.0 204.638 4.980 -999.990 -999.990 2.046 ..P WKT 2011 04 25 20 39 55 31.3200 -97.3300 251.000 122.0 207.930 4.580 -999.990 -999.990 2.079 ..P WKT 2011 04 25 20 44 55 31.3200 -97.3300 251.000 457.0 197.695 5.680 -999.990 -999.990 1.977 ..P WKT 2011 04 25 20 49 55 31.3200 -97.3300 251.000 30.0 198.147 5.490 -999.990 -999.990 1.981 ..P WKT 2011 04 25 20 54 55 31.3200 -97.3300 251.000 122.0 190.245 4.910 -999.990 -999.990 1.902 ..P WKT 2011 04 25 20 59 55 31.3200 -97.3300 251.000 457.0 187.354 5.170 -999.990 -999.990 1.874 ..P WKT 2011 04 25 21 09 55 31.3200 -97.3300 251.000 30.0 192.912 4.660 -999.990 -999.990 1.929 ..P WKT 2011 04 25 21 14 55 31.3200 -97.3300 251.000 122.0 199.192 4.710 -999.990 -999.990 1.992 ..P WKT 2011 04 25 21 19 55 31.3200 -97.3300 251.000 457.0 203.468 5.510 -999.990 -999.990 2.035 ..P WKT 2011 04 25 21 24 55 31.3200 -97.3300 251.000 30.0 201.221 5.290 -999.990 -999.990 2.012 ..P WKT 2011 04 25 21 29 55 31.3200 -97.3300 251.000 122.0 206.502 4.680 -999.990 -999.990 2.065 ..P WKT 2011 04 25 21 34 55 31.3200 -97.3300 251.000 457.0 194.216 5.540 -999.990 -999.990 1.942 ..P WKT 2011 04 25 21 44 55 31.3200 -97.3300 251.000 30.0 196.125 3.940 -999.990 -999.990 1.961 ..P WKT 2011 04 25 21 49 55 31.3200 -97.3300 251.000 122.0 195.932 3.920 -999.990 -999.990 1.959 ..P WKT 2011 04 25 21 54 55 31.3200 -97.3300 251.000 457.0 193.896 4.320 -999.990 -999.990 1.939 ..P WKT 2011 04 25 21 59 55 31.3200 -97.3300 251.000 30.0 198.058 4.640 -999.990 -999.990 1.981 ..P WKT 2011 04 25 22 04 55 31.3200 -97.3300 251.000 122.0 202.221 4.370 -999.990 -999.990 2.022 ..P WKT 2011 04 25 22 09 55 31.3200 -97.3300 251.000 457.0 196.834 4.100 -999.990 -999.990 1.968 ..P WKT 2011 04 25 22 19 55 31.3200 -97.3300 251.000 30.0 201.525 3.850 -999.990 -999.990 2.015 ..P WKT 2011 04 25 22 24 55 31.3200 -97.3300 251.000 122.0 201.045 4.820 -999.990 -999.990 2.010 ..P WKT 2011 04 25 22 29 55 31.3200 -97.3300 251.000 457.0 199.895 4.760 -999.990 -999.990 1.999 ..P WKT 2011 04 25 22 34 55 31.3200 -97.3300 251.000 30.0 195.725 4.250 -999.990 -999.990 1.957 ..P WKT 2011 04 25 22 39 55 31.3200 -97.3300 251.000 122.0 196.250 4.070 -999.990 -999.990 1.963 ..P WKT 2011 04 25 22 44 55 31.3200 -97.3300 251.000 457.0 194.091 4.490 -999.990 -999.990 1.941 ..P WKT 2011 04 25 22 54 55 31.3200 -97.3300 251.000 30.0 192.264 4.240 -999.990 -999.990 1.923 ..P WKT 2011 04 25 22 59 55 31.3200 -97.3300 251.000 122.0 188.567 3.690 -999.990 -999.990 1.886 ..P WKT 2011 04 25 23 04 55 31.3200 -97.3300 251.000 457.0 186.885 5.190 -999.990 -999.990 1.869 ..P WKT 2011 04 25 23 09 55 31.3200 -97.3300 251.000 30.0 196.624 4.090 -999.990 -999.990 1.966 ..P WKT 2011 04 25 23 14 55 31.3200 -97.3300 251.000 122.0 195.278 4.690 -999.990 -999.990 1.953 ..P WKT 2011 04 25 23 19 55 31.3200 -97.3300 251.000 457.0 193.596 4.380 -999.990 -999.990 1.936 ..P WKT 2011 04 25 23 29 55 31.3200 -97.3300 251.000 30.0 192.337 5.460 -999.990 -999.990 1.923 ..P WKT 2011 04 25 23 34 55 31.3200 -97.3300 251.000 122.0 196.460 3.860 -999.990 -999.990 1.965 ..P WKT 2011 04 25 23 39 55 31.3200 -97.3300 251.000 457.0 187.804 4.900 -999.990 -999.990 1.878 ..P WKT 2011 04 25 23 44 55 31.3200 -97.3300 251.000 30.0 195.292 3.990 -999.990 -999.990 1.953 ..P WKT 2011 04 25 23 49 55 31.3200 -97.3300 251.000 122.0 199.754 3.820 -999.990 -999.990 1.998 ..P WKT 2011 04 26 00 09 55 31.3200 -97.3300 251.000 457.0 199.890 4.640 -999.990 -999.990 1.999 ..P WKT 2011 04 26 00 10 25 31.3200 -97.3300 251.000 457.0 200.220 3.900 -999.990 -999.990 2.002 ..P WKT 2011 04 26 00 10 55 31.3200 -97.3300 251.000 457.0 199.877 4.020 -999.990 -999.990 1.999 ..P WKT 2011 04 26 00 11 25 31.3200 -97.3300 251.000 457.0 199.871 3.850 -999.990 -999.990 1.999 ..P WKT 2011 04 26 00 11 55 31.3200 -97.3300 251.000 457.0 200.200 3.730 -999.990 -999.990 2.002 ..P WKT 2011 04 26 00 12 25 31.3200 -97.3300 251.000 457.0 199.184 3.990 -999.990 -999.990 1.992 ..P WKT 2011 04 26 00 12 55 31.3200 -97.3300 251.000 457.0 197.832 4.500 -999.990 -999.990 1.978 ..P WKT 2011 04 26 00 13 25 31.3200 -97.3300 251.000 457.0 204.220 3.940 -999.990 -999.990 2.042 ..P WKT 2011 04 26 00 13 55 31.3200 -97.3300 251.000 457.0 201.520 4.040 -999.990 -999.990 2.015 ..P WKT 2011 04 26 00 14 25 31.3200 -97.3300 251.000 457.0 199.158 3.740 -999.990 -999.990 1.992 ..P WKT 2011 04 26 00 14 55 31.3200 -97.3300 251.000 457.0 205.883 4.230 -999.990 -999.990 2.059 ..P WKT 2011 04 26 00 19 55 31.3200 -97.3300 251.000 30.0 201.106 4.040 -999.990 -999.990 2.011 ..P WKT 2011 04 26 00 24 55 31.3200 -97.3300 251.000 122.0 206.088 4.010 -999.990 -999.990 2.061 ..P WKT 2011 04 26 00 29 55 31.3200 -97.3300 251.000 457.0 202.154 4.190 -999.990 -999.990 2.022 ..P WKT 2011 04 26 00 34 55 31.3200 -97.3300 251.000 30.0 194.350 5.340 -999.990 -999.990 1.944 ..P WKT 2011 04 26 00 39 55 31.3200 -97.3300 251.000 122.0 198.827 4.190 -999.990 -999.990 1.988 ..P WKT 2011 04 26 00 44 55 31.3200 -97.3300 251.000 457.0 197.080 4.030 -999.990 -999.990 1.971 ..P WKT 2011 04 26 00 54 55 31.3200 -97.3300 251.000 30.0 194.628 5.500 -999.990 -999.990 1.946 ..P WKT 2011 04 26 00 59 55 31.3200 -97.3300 251.000 122.0 202.836 4.840 -999.990 -999.990 2.028 ..P WKT 2011 04 26 01 04 55 31.3200 -97.3300 251.000 457.0 194.058 4.450 -999.990 -999.990 1.941 ..P WKT 2011 04 26 01 09 55 31.3200 -97.3300 251.000 30.0 200.752 4.700 -999.990 -999.990 2.008 ..P WKT 2011 04 26 01 14 55 31.3200 -97.3300 251.000 122.0 201.895 4.740 -999.990 -999.990 2.019 ..P WKT 2011 04 26 01 19 55 31.3200 -97.3300 251.000 457.0 162.690 5.690 -999.990 -999.990 1.627 ..P WKT 2011 04 26 01 29 55 31.3200 -97.3300 251.000 30.0 176.246 5.040 -999.990 -999.990 1.762 ..P WKT 2011 04 26 01 34 55 31.3200 -97.3300 251.000 122.0 170.499 4.930 -999.990 -999.990 1.705 ..P WKT 2011 04 26 01 39 55 31.3200 -97.3300 251.000 457.0 145.929 4.940 -999.990 -999.990 1.459 ..P WKT 2011 04 26 01 44 55 31.3200 -97.3300 251.000 30.0 160.522 4.500 -999.990 -999.990 1.605 ..P WKT 2011 04 26 01 49 55 31.3200 -97.3300 251.000 122.0 138.141 5.170 -999.990 -999.990 1.381 ..P WKT 2011 04 26 01 54 55 31.3200 -97.3300 251.000 457.0 136.432 5.250 -999.990 -999.990 1.364 ..P WKT 2011 04 26 02 04 55 31.3200 -97.3300 251.000 30.0 138.655 3.850 -999.990 -999.990 1.387 ..P WKT 2011 04 26 02 09 55 31.3200 -97.3300 251.000 122.0 146.282 3.880 -999.990 -999.990 1.463 ..P WKT 2011 04 26 02 14 55 31.3200 -97.3300 251.000 457.0 135.262 3.910 -999.990 -999.990 1.353 ..P WKT 2011 04 26 02 19 55 31.3200 -97.3300 251.000 30.0 138.689 4.620 -999.990 -999.990 1.387 ..P WKT 2011 04 26 02 24 55 31.3200 -97.3300 251.000 122.0 141.443 3.830 -999.990 -999.990 1.414 ..P WKT 2011 04 26 02 29 55 31.3200 -97.3300 251.000 457.0 128.914 3.620 -999.990 -999.990 1.289 ..P WKT 2011 04 26 02 39 55 31.3200 -97.3300 251.000 30.0 135.383 4.950 -999.990 -999.990 1.354 ..P WKT 2011 04 26 02 44 55 31.3200 -97.3300 251.000 122.0 139.600 5.070 -999.990 -999.990 1.396 ..P WKT 2011 04 26 02 49 55 31.3200 -97.3300 251.000 457.0 134.750 4.310 -999.990 -999.990 1.347 ..P WKT 2011 04 26 02 54 55 31.3200 -97.3300 251.000 30.0 134.267 3.290 -999.990 -999.990 1.343 ..P WKT 2011 04 26 02 59 55 31.3200 -97.3300 251.000 122.0 125.724 3.400 -999.990 -999.990 1.257 ..P WKT 2011 04 26 03 04 55 31.3200 -97.3300 251.000 457.0 130.277 3.220 -999.990 -999.990 1.303 ..P WKT 2011 04 26 03 14 55 31.3200 -97.3300 251.000 30.0 139.333 3.170 -999.990 -999.990 1.393 ..P WKT 2011 04 26 03 19 55 31.3200 -97.3300 251.000 122.0 135.109 3.140 -999.990 -999.990 1.351 ..P WKT 2011 04 26 03 24 55 31.3200 -97.3300 251.000 457.0 135.583 3.520 -999.990 -999.990 1.356 ..P WKT 2011 04 26 03 29 55 31.3200 -97.3300 251.000 30.0 178.348 5.520 -999.990 -999.990 1.783 ..P WKT 2011 04 26 03 34 55 31.3200 -97.3300 251.000 122.0 143.245 3.610 -999.990 -999.990 1.432 ..P WKT 2011 04 26 03 39 55 31.3200 -97.3300 251.000 457.0 125.598 3.570 -999.990 -999.990 1.256 ..P WKT 2011 04 26 03 49 55 31.3200 -97.3300 251.000 30.0 170.650 3.660 -999.990 -999.990 1.707 ..P WKT 2011 04 26 03 54 55 31.3200 -97.3300 251.000 122.0 131.003 3.990 -999.990 -999.990 1.310 ..P WKT 2011 04 26 03 59 55 31.3200 -97.3300 251.000 457.0 120.551 4.700 -999.990 -999.990 1.206 ..P WKT 2011 04 26 04 04 55 31.3200 -97.3300 251.000 30.0 162.434 5.270 -999.990 -999.990 1.624 ..P WKT 2011 04 26 04 09 55 31.3200 -97.3300 251.000 122.0 154.999 4.520 -999.990 -999.990 1.550 ..P WKT 2011 04 26 04 14 55 31.3200 -97.3300 251.000 457.0 126.098 3.780 -999.990 -999.990 1.261 ..P WKT 2011 04 26 04 24 55 31.3200 -97.3300 251.000 30.0 170.266 4.080 -999.990 -999.990 1.703 ..P WKT 2011 04 26 04 29 55 31.3200 -97.3300 251.000 122.0 155.287 4.900 -999.990 -999.990 1.553 ..P WKT 2011 04 26 04 34 55 31.3200 -97.3300 251.000 457.0 119.017 5.060 -999.990 -999.990 1.190 ..P WKT 2011 04 26 04 39 55 31.3200 -97.3300 251.000 30.0 164.066 4.400 -999.990 -999.990 1.641 ..P WKT 2011 04 26 04 44 55 31.3200 -97.3300 251.000 122.0 165.855 4.660 -999.990 -999.990 1.659 ..P WKT 2011 04 26 04 49 55 31.3200 -97.3300 251.000 457.0 135.124 3.390 -999.990 -999.990 1.351 ..P WKT 2011 04 26 05 04 55 31.3200 -97.3300 251.000 30.0 176.125 3.900 -999.990 -999.990 1.761 ..P WKT 2011 04 26 05 09 55 31.3200 -97.3300 251.000 122.0 167.403 4.150 -999.990 -999.990 1.674 ..P WKT 2011 04 26 05 14 55 31.3200 -97.3300 251.000 457.0 133.545 4.210 -999.990 -999.990 1.335 ..P WKT 2011 04 26 05 19 55 31.3200 -97.3300 251.000 30.0 164.038 5.070 -999.990 -999.990 1.640 ..P WKT 2011 04 26 05 24 55 31.3200 -97.3300 251.000 122.0 161.015 5.050 -999.990 -999.990 1.610 ..P WKT 2011 04 26 05 29 55 31.3200 -97.3300 251.000 457.0 131.355 4.990 -999.990 -999.990 1.314 ..P WKT 2011 04 26 05 39 55 31.3200 -97.3300 251.000 30.0 153.961 6.370 -999.990 -999.990 1.540 ..P WKT 2011 04 26 05 44 55 31.3200 -97.3300 251.000 122.0 156.133 5.100 -999.990 -999.990 1.561 ..P WKT 2011 04 26 05 49 55 31.3200 -97.3300 251.000 457.0 131.840 4.460 -999.990 -999.990 1.318 ..P WKT 2011 04 26 05 54 55 31.3200 -97.3300 251.000 30.0 157.628 4.630 -999.990 -999.990 1.576 ..P WKT 2011 04 26 05 59 55 31.3200 -97.3300 251.000 122.0 155.613 3.840 -999.990 -999.990 1.556 ..P WKT 2011 04 26 06 04 55 31.3200 -97.3300 251.000 457.0 133.837 5.030 -999.990 -999.990 1.338 ..P WKT 2011 04 26 06 14 55 31.3200 -97.3300 251.000 30.0 151.553 3.720 -999.990 -999.990 1.516 ..P WKT 2011 04 26 06 19 55 31.3200 -97.3300 251.000 122.0 161.067 3.800 -999.990 -999.990 1.611 ..P WKT 2011 04 26 06 24 55 31.3200 -97.3300 251.000 457.0 141.114 5.870 -999.990 -999.990 1.411 ..P WKT 2011 04 26 06 29 55 31.3200 -97.3300 251.000 30.0 152.134 3.740 -999.990 -999.990 1.521 ..P WKT 2011 04 26 06 34 55 31.3200 -97.3300 251.000 122.0 155.117 3.250 -999.990 -999.990 1.551 ..P WKT 2011 04 26 06 39 55 31.3200 -97.3300 251.000 457.0 137.345 3.040 -999.990 -999.990 1.373 ..P WKT 2011 04 26 06 49 55 31.3200 -97.3300 251.000 30.0 153.857 3.340 -999.990 -999.990 1.539 ..P WKT 2011 04 26 06 54 55 31.3200 -97.3300 251.000 122.0 151.651 4.750 -999.990 -999.990 1.517 ..P WKT 2011 04 26 06 59 55 31.3200 -97.3300 251.000 457.0 143.088 3.040 -999.990 -999.990 1.431 ..P WKT 2011 04 26 07 04 55 31.3200 -97.3300 251.000 30.0 147.912 3.360 -999.990 -999.990 1.479 ..P WKT 2011 04 26 07 09 55 31.3200 -97.3300 251.000 122.0 159.761 3.040 -999.990 -999.990 1.598 ..P WKT 2011 04 26 07 14 55 31.3200 -97.3300 251.000 457.0 149.192 3.180 -999.990 -999.990 1.492 ..P WKT 2011 04 26 07 24 55 31.3200 -97.3300 251.000 30.0 147.365 3.740 -999.990 -999.990 1.474 ..P WKT 2011 04 26 07 29 55 31.3200 -97.3300 251.000 122.0 152.426 3.740 -999.990 -999.990 1.524 ..P WKT 2011 04 26 07 34 55 31.3200 -97.3300 251.000 457.0 144.774 3.540 -999.990 -999.990 1.448 ..P WKT 2011 04 26 07 39 55 31.3200 -97.3300 251.000 30.0 150.503 3.230 -999.990 -999.990 1.505 ..P WKT 2011 04 26 07 44 55 31.3200 -97.3300 251.000 122.0 151.883 3.470 -999.990 -999.990 1.519 ..P WKT 2011 04 26 07 49 55 31.3200 -97.3300 251.000 457.0 149.919 3.450 -999.990 -999.990 1.499 ..P WKT 2011 04 26 07 59 55 31.3200 -97.3300 251.000 30.0 154.709 2.760 -999.990 -999.990 1.547 ..P WKT 2011 04 26 08 04 55 31.3200 -97.3300 251.000 122.0 152.100 3.090 -999.990 -999.990 1.521 ..P WKT 2011 04 26 08 09 55 31.3200 -97.3300 251.000 457.0 150.829 2.830 -999.990 -999.990 1.508 ..P WKT 2011 04 26 08 14 55 31.3200 -97.3300 251.000 30.0 161.927 4.700 -999.990 -999.990 1.619 ..P WKT 2011 04 26 08 19 55 31.3200 -97.3300 251.000 122.0 155.641 2.970 -999.990 -999.990 1.556 ..P WKT 2011 04 26 08 24 55 31.3200 -97.3300 251.000 457.0 149.355 3.130 -999.990 -999.990 1.494 ..P WKT 2011 04 26 08 34 55 31.3200 -97.3300 251.000 30.0 139.151 2.990 -999.990 -999.990 1.392 ..P WKT 2011 04 26 08 39 55 31.3200 -97.3300 251.000 122.0 163.973 3.540 -999.990 -999.990 1.640 ..P WKT 2011 04 26 08 44 55 31.3200 -97.3300 251.000 457.0 147.353 3.450 -999.990 -999.990 1.474 ..P WKT 2011 04 26 08 49 55 31.3200 -97.3300 251.000 30.0 146.774 3.170 -999.990 -999.990 1.468 ..P WKT 2011 04 26 08 54 55 31.3200 -97.3300 251.000 122.0 162.569 3.300 -999.990 -999.990 1.626 ..P WKT 2011 04 26 08 59 55 31.3200 -97.3300 251.000 457.0 140.773 2.890 -999.990 -999.990 1.408 ..P WKT 2011 04 26 09 09 55 31.3200 -97.3300 251.000 30.0 157.587 3.240 -999.990 -999.990 1.576 ..P WKT 2011 04 26 09 14 55 31.3200 -97.3300 251.000 122.0 176.979 3.960 -999.990 -999.990 1.770 ..P WKT 2011 04 26 09 19 55 31.3200 -97.3300 251.000 457.0 150.607 3.700 -999.990 -999.990 1.506 ..P WKT 2011 04 26 09 24 55 31.3200 -97.3300 251.000 30.0 166.992 4.720 -999.990 -999.990 1.670 ..P WKT 2011 04 26 09 29 55 31.3200 -97.3300 251.000 122.0 150.143 4.730 -999.990 -999.990 1.501 ..P WKT 2011 04 26 09 34 55 31.3200 -97.3300 251.000 457.0 152.500 4.980 -999.990 -999.990 1.525 ..P WKT 2011 04 26 09 44 55 31.3200 -97.3300 251.000 30.0 154.134 4.930 -999.990 -999.990 1.541 ..P WKT 2011 04 26 09 49 55 31.3200 -97.3300 251.000 122.0 153.413 5.170 -999.990 -999.990 1.534 ..P WKT 2011 04 26 09 54 55 31.3200 -97.3300 251.000 457.0 152.024 4.530 -999.990 -999.990 1.520 ..P WKT 2011 04 26 09 59 55 31.3200 -97.3300 251.000 30.0 154.141 4.220 -999.990 -999.990 1.541 ..P WKT 2011 04 26 10 04 55 31.3200 -97.3300 251.000 122.0 154.588 4.930 -999.990 -999.990 1.546 ..P WKT 2011 04 26 10 09 55 31.3200 -97.3300 251.000 457.0 145.522 3.830 -999.990 -999.990 1.455 ..P WKT 2011 04 26 10 19 55 31.3200 -97.3300 251.000 30.0 160.054 3.900 -999.990 -999.990 1.601 ..P WKT 2011 04 26 10 24 55 31.3200 -97.3300 251.000 122.0 162.956 3.550 -999.990 -999.990 1.630 ..P WKT 2011 04 26 10 29 55 31.3200 -97.3300 251.000 457.0 137.493 3.300 -999.990 -999.990 1.375 ..P WKT 2011 04 26 10 34 55 31.3200 -97.3300 251.000 30.0 151.073 4.170 -999.990 -999.990 1.511 ..P WKT 2011 04 26 10 39 55 31.3200 -97.3300 251.000 122.0 156.311 4.270 -999.990 -999.990 1.563 ..P WKT 2011 04 26 10 44 55 31.3200 -97.3300 251.000 457.0 144.867 2.850 -999.990 -999.990 1.449 ..P WKT 2011 04 26 10 54 55 31.3200 -97.3300 251.000 30.0 153.529 2.770 -999.990 -999.990 1.535 ..P WKT 2011 04 26 10 59 55 31.3200 -97.3300 251.000 122.0 151.284 2.910 -999.990 -999.990 1.513 ..P WKT 2011 04 26 11 04 55 31.3200 -97.3300 251.000 457.0 143.370 4.540 -999.990 -999.990 1.434 ..P WKT 2011 04 26 11 09 55 31.3200 -97.3300 251.000 30.0 157.134 5.390 -999.990 -999.990 1.571 ..P WKT 2011 04 26 11 14 55 31.3200 -97.3300 251.000 122.0 155.890 4.830 -999.990 -999.990 1.559 ..P WKT 2011 04 26 11 19 55 31.3200 -97.3300 251.000 457.0 141.306 4.080 -999.990 -999.990 1.413 ..P WKT 2011 04 26 11 29 55 31.3200 -97.3300 251.000 30.0 141.809 3.820 -999.990 -999.990 1.418 ..P WKT 2011 04 26 11 34 55 31.3200 -97.3300 251.000 122.0 155.223 4.150 -999.990 -999.990 1.552 ..P WKT 2011 04 26 11 39 55 31.3200 -97.3300 251.000 457.0 146.966 5.050 -999.990 -999.990 1.470 ..P WKT 2011 04 26 11 44 55 31.3200 -97.3300 251.000 30.0 148.377 5.050 -999.990 -999.990 1.484 ..P WKT 2011 04 26 11 49 55 31.3200 -97.3300 251.000 122.0 155.789 3.810 -999.990 -999.990 1.558 ..P WKT 2011 04 26 12 09 55 31.3200 -97.3300 251.000 457.0 148.320 3.890 -999.990 -999.990 1.483 ..P WKT 2011 04 26 12 10 25 31.3200 -97.3300 251.000 457.0 158.715 4.690 -999.990 -999.990 1.587 ..P WKT 2011 04 26 12 10 55 31.3200 -97.3300 251.000 457.0 152.113 4.190 -999.990 -999.990 1.521 ..P WKT 2011 04 26 12 11 25 31.3200 -97.3300 251.000 457.0 152.844 3.880 -999.990 -999.990 1.528 ..P WKT 2011 04 26 12 11 55 31.3200 -97.3300 251.000 457.0 149.242 3.910 -999.990 -999.990 1.492 ..P WKT 2011 04 26 12 12 25 31.3200 -97.3300 251.000 457.0 152.305 4.830 -999.990 -999.990 1.523 ..P WKT 2011 04 26 12 12 55 31.3200 -97.3300 251.000 457.0 149.702 3.840 -999.990 -999.990 1.497 ..P WKT 2011 04 26 12 13 25 31.3200 -97.3300 251.000 457.0 148.767 5.290 -999.990 -999.990 1.488 ..P WKT 2011 04 26 12 13 55 31.3200 -97.3300 251.000 457.0 155.495 4.060 -999.990 -999.990 1.555 ..P WKT 2011 04 26 12 14 25 31.3200 -97.3300 251.000 457.0 150.561 4.200 -999.990 -999.990 1.506 ..P WKT 2011 04 26 12 14 55 31.3200 -97.3300 251.000 457.0 149.792 3.790 -999.990 -999.990 1.498 ..P WKT 2011 04 26 12 19 55 31.3200 -97.3300 251.000 30.0 157.927 3.950 -999.990 -999.990 1.579 ..P WKT 2011 04 26 12 24 55 31.3200 -97.3300 251.000 122.0 169.061 4.150 -999.990 -999.990 1.691 ..P WKT 2011 04 26 12 29 55 31.3200 -97.3300 251.000 457.0 151.540 3.850 -999.990 -999.990 1.515 ..P WKT 2011 04 26 12 34 55 31.3200 -97.3300 251.000 30.0 155.676 4.110 -999.990 -999.990 1.557 ..P WKT 2011 04 26 12 39 55 31.3200 -97.3300 251.000 122.0 162.810 3.460 -999.990 -999.990 1.628 ..P WKT 2011 04 26 12 44 55 31.3200 -97.3300 251.000 457.0 155.286 5.650 -999.990 -999.990 1.553 ..P WKT 2011 04 26 12 54 55 31.3200 -97.3300 251.000 30.0 159.792 4.340 -999.990 -999.990 1.598 ..P WKT 2011 04 26 12 59 55 31.3200 -97.3300 251.000 122.0 167.822 3.820 -999.990 -999.990 1.678 ..P WKT 2011 04 26 13 04 55 31.3200 -97.3300 251.000 457.0 164.196 3.470 -999.990 -999.990 1.642 ..P WKT 2011 04 26 13 09 55 31.3200 -97.3300 251.000 30.0 166.065 3.290 -999.990 -999.990 1.661 ..P WKT 2011 04 26 13 14 55 31.3200 -97.3300 251.000 122.0 171.097 3.160 -999.990 -999.990 1.711 ..P WKT 2011 04 26 13 19 55 31.3200 -97.3300 251.000 457.0 174.296 3.350 -999.990 -999.990 1.743 ..P WKT 2011 04 26 13 29 55 31.3200 -97.3300 251.000 30.0 168.233 3.570 -999.990 -999.990 1.682 ..P WKT 2011 04 26 13 34 55 31.3200 -97.3300 251.000 122.0 167.129 3.720 -999.990 -999.990 1.671 ..P WKT 2011 04 26 13 39 55 31.3200 -97.3300 251.000 457.0 162.863 3.130 -999.990 -999.990 1.629 ..P WKT 2011 04 26 13 44 55 31.3200 -97.3300 251.000 30.0 180.398 3.290 -999.990 -999.990 1.804 ..P WKT 2011 04 26 13 49 55 31.3200 -97.3300 251.000 122.0 171.139 3.820 -999.990 -999.990 1.711 ..P WKT 2011 04 26 13 54 55 31.3200 -97.3300 251.000 457.0 164.710 5.290 -999.990 -999.990 1.647 ..P WKT 2011 04 26 14 04 55 31.3200 -97.3300 251.000 30.0 168.183 5.010 -999.990 -999.990 1.682 ..P WKT 2011 04 26 14 09 55 31.3200 -97.3300 251.000 122.0 170.098 3.780 -999.990 -999.990 1.701 ..P WKT 2011 04 26 14 14 55 31.3200 -97.3300 251.000 457.0 169.683 3.100 -999.990 -999.990 1.697 ..P WKT 2011 04 26 14 19 55 31.3200 -97.3300 251.000 30.0 163.612 3.300 -999.990 -999.990 1.636 ..P WKT 2011 04 26 14 24 55 31.3200 -97.3300 251.000 122.0 176.838 5.150 -999.990 -999.990 1.768 ..P WKT 2011 04 26 14 29 55 31.3200 -97.3300 251.000 457.0 163.781 2.810 -999.990 -999.990 1.638 ..P WKT 2011 04 26 14 39 55 31.3200 -97.3300 251.000 30.0 171.672 2.830 -999.990 -999.990 1.717 ..P WKT 2011 04 26 14 44 55 31.3200 -97.3300 251.000 122.0 173.990 3.020 -999.990 -999.990 1.740 ..P WKT 2011 04 26 14 49 55 31.3200 -97.3300 251.000 457.0 174.644 3.710 -999.990 -999.990 1.746 ..P WKT 2011 04 26 14 54 55 31.3200 -97.3300 251.000 30.0 165.321 3.210 -999.990 -999.990 1.653 ..P WKT 2011 04 26 14 59 55 31.3200 -97.3300 251.000 122.0 173.625 3.800 -999.990 -999.990 1.736 ..P WKT 2011 04 26 15 04 55 31.3200 -97.3300 251.000 457.0 165.633 3.510 -999.990 -999.990 1.656 ..P WKT 2011 04 26 15 14 55 31.3200 -97.3300 251.000 30.0 172.831 6.150 -999.990 -999.990 1.728 ..P WKT 2011 04 26 15 19 55 31.3200 -97.3300 251.000 122.0 178.378 4.030 -999.990 -999.990 1.784 ..P WKT 2011 04 26 15 24 55 31.3200 -97.3300 251.000 457.0 171.289 4.090 -999.990 -999.990 1.713 ..P WKT 2011 04 26 15 29 55 31.3200 -97.3300 251.000 30.0 177.500 4.050 -999.990 -999.990 1.775 ..P WKT 2011 04 26 15 34 55 31.3200 -97.3300 251.000 122.0 179.388 4.210 -999.990 -999.990 1.794 ..P WKT 2011 04 26 15 39 55 31.3200 -97.3300 251.000 457.0 172.966 4.310 -999.990 -999.990 1.730 ..P WKT 2011 04 26 15 49 55 31.3200 -97.3300 251.000 30.0 171.021 4.460 -999.990 -999.990 1.710 ..P WKT 2011 04 26 15 54 55 31.3200 -97.3300 251.000 122.0 176.162 4.680 -999.990 -999.990 1.762 ..P WKT 2011 04 26 15 59 55 31.3200 -97.3300 251.000 457.0 169.671 4.340 -999.990 -999.990 1.697 ..P WKT 2011 04 26 16 04 55 31.3200 -97.3300 251.000 30.0 169.162 4.350 -999.990 -999.990 1.692 ..P WKT 2011 04 26 16 09 55 31.3200 -97.3300 251.000 122.0 167.656 4.520 -999.990 -999.990 1.677 ..P WKT 2011 04 26 16 14 55 31.3200 -97.3300 251.000 457.0 165.818 5.620 -999.990 -999.990 1.658 ..P WKT 2011 04 26 16 24 55 31.3200 -97.3300 251.000 30.0 168.147 4.490 -999.990 -999.990 1.681 ..P WKT 2011 04 26 16 29 55 31.3200 -97.3300 251.000 122.0 172.977 4.770 -999.990 -999.990 1.730 ..P WKT 2011 04 26 16 34 55 31.3200 -97.3300 251.000 457.0 164.187 5.920 -999.990 -999.990 1.642 ..P WKT 2011 04 26 16 39 55 31.3200 -97.3300 251.000 30.0 159.218 4.080 -999.990 -999.990 1.592 ..P WKT 2011 04 26 16 44 55 31.3200 -97.3300 251.000 122.0 173.678 4.180 -999.990 -999.990 1.737 ..P WKT 2011 04 26 16 49 55 31.3200 -97.3300 251.000 457.0 166.884 4.160 -999.990 -999.990 1.669 ..P WKT 2011 04 26 17 04 55 31.3200 -97.3300 251.000 30.0 169.905 4.500 -999.990 -999.990 1.699 ..P WKT 2011 04 26 17 09 55 31.3200 -97.3300 251.000 122.0 171.326 3.940 -999.990 -999.990 1.713 ..P WKT 2011 04 26 17 14 55 31.3200 -97.3300 251.000 457.0 175.071 4.510 -999.990 -999.990 1.751 ..P WKT 2011 04 26 17 19 55 31.3200 -97.3300 251.000 30.0 171.844 3.540 -999.990 -999.990 1.718 ..P WKT 2011 04 26 17 24 55 31.3200 -97.3300 251.000 122.0 174.094 3.720 -999.990 -999.990 1.741 ..P WKT 2011 04 26 17 29 55 31.3200 -97.3300 251.000 457.0 161.408 5.070 -999.990 -999.990 1.614 ..P WKT 2011 04 26 17 39 55 31.3200 -97.3300 251.000 30.0 164.407 3.270 -999.990 -999.990 1.644 ..P WKT 2011 04 26 17 44 55 31.3200 -97.3300 251.000 122.0 173.452 3.290 -999.990 -999.990 1.735 ..P WKT 2011 04 26 17 49 55 31.3200 -97.3300 251.000 457.0 164.410 4.180 -999.990 -999.990 1.644 ..P WKT 2011 04 26 17 54 55 31.3200 -97.3300 251.000 30.0 170.301 4.610 -999.990 -999.990 1.703 ..P WKT 2011 04 26 17 59 55 31.3200 -97.3300 251.000 122.0 166.901 3.770 -999.990 -999.990 1.669 ..P WKT 2011 04 26 18 04 55 31.3200 -97.3300 251.000 457.0 162.839 3.460 -999.990 -999.990 1.628 ..P WKT 2011 04 26 18 14 55 31.3200 -97.3300 251.000 30.0 163.197 3.580 -999.990 -999.990 1.632 ..P WKT 2011 04 26 18 19 55 31.3200 -97.3300 251.000 122.0 171.432 3.760 -999.990 -999.990 1.714 ..P WKT 2011 04 26 18 24 55 31.3200 -97.3300 251.000 457.0 165.403 4.290 -999.990 -999.990 1.654 ..P WKT 2011 04 26 18 29 55 31.3200 -97.3300 251.000 30.0 171.316 4.300 -999.990 -999.990 1.713 ..P WKT 2011 04 26 18 34 55 31.3200 -97.3300 251.000 122.0 176.233 4.000 -999.990 -999.990 1.762 ..P WKT 2011 04 26 18 39 55 31.3200 -97.3300 251.000 457.0 162.577 3.630 -999.990 -999.990 1.626 ..P WKT 2011 04 26 18 49 55 31.3200 -97.3300 251.000 30.0 175.157 3.180 -999.990 -999.990 1.752 ..P WKT 2011 04 26 18 54 55 31.3200 -97.3300 251.000 122.0 179.505 3.840 -999.990 -999.990 1.795 ..P WKT 2011 04 26 18 59 55 31.3200 -97.3300 251.000 457.0 172.909 4.510 -999.990 -999.990 1.729 ..P WKT 2011 04 26 19 04 55 31.3200 -97.3300 251.000 30.0 177.919 4.980 -999.990 -999.990 1.779 ..P WKT 2011 04 26 19 09 55 31.3200 -97.3300 251.000 122.0 175.634 4.030 -999.990 -999.990 1.756 ..P WKT 2011 04 26 19 14 55 31.3200 -97.3300 251.000 457.0 175.671 3.410 -999.990 -999.990 1.757 ..P WKT 2011 04 26 19 24 55 31.3200 -97.3300 251.000 30.0 175.506 3.210 -999.990 -999.990 1.755 ..P WKT 2011 04 26 19 29 55 31.3200 -97.3300 251.000 122.0 183.591 4.530 -999.990 -999.990 1.836 ..P WKT 2011 04 26 19 34 55 31.3200 -97.3300 251.000 457.0 175.105 5.120 -999.990 -999.990 1.751 ..P WKT 2011 04 26 19 39 55 31.3200 -97.3300 251.000 30.0 171.922 5.380 -999.990 -999.990 1.719 ..P WKT 2011 04 26 19 44 55 31.3200 -97.3300 251.000 122.0 182.989 5.910 -999.990 -999.990 1.830 ..P WKT 2011 04 26 19 49 55 31.3200 -97.3300 251.000 457.0 176.160 3.850 -999.990 -999.990 1.762 ..P WKT 2011 04 26 19 59 55 31.3200 -97.3300 251.000 30.0 173.157 3.670 -999.990 -999.990 1.732 ..P WKT 2011 04 26 20 04 55 31.3200 -97.3300 251.000 122.0 173.667 4.970 -999.990 -999.990 1.737 ..P WKT 2011 04 26 20 09 55 31.3200 -97.3300 251.000 457.0 170.532 5.690 -999.990 -999.990 1.705 ..P WKT 2011 04 26 20 14 55 31.3200 -97.3300 251.000 30.0 172.864 5.920 -999.990 -999.990 1.729 ..P WKT 2011 04 26 20 19 55 31.3200 -97.3300 251.000 122.0 178.839 5.510 -999.990 -999.990 1.788 ..P WKT 2011 04 26 20 24 55 31.3200 -97.3300 251.000 457.0 174.215 4.650 -999.990 -999.990 1.742 ..P WKT 2011 04 26 20 34 55 31.3200 -97.3300 251.000 30.0 177.221 4.210 -999.990 -999.990 1.772 ..P WKT 2011 04 26 20 39 55 31.3200 -97.3300 251.000 122.0 182.365 5.200 -999.990 -999.990 1.824 ..P WKT 2011 04 26 20 44 55 31.3200 -97.3300 251.000 457.0 178.570 6.190 -999.990 -999.990 1.786 ..P WKT 2011 04 26 20 49 55 31.3200 -97.3300 251.000 30.0 183.879 4.960 -999.990 -999.990 1.839 ..P WKT 2011 04 26 20 54 55 31.3200 -97.3300 251.000 122.0 196.639 4.500 -999.990 -999.990 1.966 ..P WKT 2011 04 26 20 59 55 31.3200 -97.3300 251.000 457.0 194.332 3.840 -999.990 -999.990 1.943 ..P WKT 2011 04 26 21 09 55 31.3200 -97.3300 251.000 30.0 202.324 3.480 -999.990 -999.990 2.023 ..P WKT 2011 04 26 21 14 55 31.3200 -97.3300 251.000 122.0 201.696 5.190 -999.990 -999.990 2.017 ..P WKT 2011 04 26 21 19 55 31.3200 -97.3300 251.000 457.0 202.062 4.780 -999.990 -999.990 2.021 ..P WKT 2011 04 26 21 24 55 31.3200 -97.3300 251.000 30.0 197.960 5.690 -999.990 -999.990 1.980 ..P WKT 2011 04 26 21 29 55 31.3200 -97.3300 251.000 122.0 204.614 6.280 -999.990 -999.990 2.046 ..P WKT 2011 04 26 21 34 55 31.3200 -97.3300 251.000 457.0 194.720 7.150 -999.990 -999.990 1.947 ..P WKT 2011 04 26 21 44 55 31.3200 -97.3300 251.000 30.0 196.255 7.740 -999.990 -999.990 1.963 ..P WKT 2011 04 26 21 49 55 31.3200 -97.3300 251.000 122.0 208.343 7.330 -999.990 -999.990 2.083 ..P WKT 2011 04 26 21 54 55 31.3200 -97.3300 251.000 457.0 209.512 7.120 -999.990 -999.990 2.095 ..P WKT 2011 04 26 21 59 55 31.3200 -97.3300 251.000 30.0 203.402 6.480 -999.990 -999.990 2.034 ..P WKT 2011 04 26 22 04 55 31.3200 -97.3300 251.000 122.0 207.052 6.480 -999.990 -999.990 2.071 ..P WKT 2011 04 26 22 09 55 31.3200 -97.3300 251.000 457.0 206.567 5.860 -999.990 -999.990 2.066 ..P WKT 2011 04 26 22 19 55 31.3200 -97.3300 251.000 30.0 203.469 5.100 -999.990 -999.990 2.035 ..P WKT 2011 04 26 22 24 55 31.3200 -97.3300 251.000 122.0 216.403 4.670 -999.990 -999.990 2.164 ..P WKT 2011 04 26 22 29 55 31.3200 -97.3300 251.000 457.0 206.845 4.450 -999.990 -999.990 2.068 ..P WKT 2011 04 26 22 34 55 31.3200 -97.3300 251.000 30.0 205.557 3.770 -999.990 -999.990 2.056 ..P WKT 2011 04 26 22 39 55 31.3200 -97.3300 251.000 122.0 204.930 4.020 -999.990 -999.990 2.049 ..P WKT 2011 04 26 22 44 55 31.3200 -97.3300 251.000 457.0 198.352 3.120 -999.990 -999.990 1.984 ..P WKT 2011 04 26 22 54 55 31.3200 -97.3300 251.000 30.0 205.269 3.370 -999.990 -999.990 2.053 ..P WKT 2011 04 26 22 59 55 31.3200 -97.3300 251.000 122.0 205.539 3.610 -999.990 -999.990 2.055 ..P WKT 2011 04 26 23 04 55 31.3200 -97.3300 251.000 457.0 203.166 3.290 -999.990 -999.990 2.032 ..P WKT 2011 04 26 23 09 55 31.3200 -97.3300 251.000 30.0 202.776 3.040 -999.990 -999.990 2.028 ..P WKT 2011 04 26 23 14 55 31.3200 -97.3300 251.000 122.0 209.657 3.500 -999.990 -999.990 2.097 ..P WKT 2011 04 26 23 19 55 31.3200 -97.3300 251.000 457.0 198.029 3.330 -999.990 -999.990 1.980 ..P WKT 2011 04 26 23 29 55 31.3200 -97.3300 251.000 30.0 196.056 3.480 -999.990 -999.990 1.961 ..P WKT 2011 04 26 23 34 55 31.3200 -97.3300 251.000 122.0 196.457 3.180 -999.990 -999.990 1.965 ..P WKT 2011 04 26 23 39 55 31.3200 -97.3300 251.000 457.0 193.223 3.570 -999.990 -999.990 1.932 ..P WKT 2011 04 26 23 44 55 31.3200 -97.3300 251.000 30.0 193.954 4.870 -999.990 -999.990 1.940 ..P WKT 2011 04 26 23 49 55 31.3200 -97.3300 251.000 122.0 201.293 3.830 -999.990 -999.990 2.013 ..P WKT 2011 04 27 00 09 55 31.3200 -97.3300 251.000 457.0 199.335 3.860 -999.990 -999.990 1.993 ..P WKT 2011 04 27 00 10 25 31.3200 -97.3300 251.000 457.0 196.435 3.830 -999.990 -999.990 1.964 ..P WKT 2011 04 27 00 10 55 31.3200 -97.3300 251.000 457.0 196.015 4.090 -999.990 -999.990 1.960 ..P WKT 2011 04 27 00 11 25 31.3200 -97.3300 251.000 457.0 195.924 4.250 -999.990 -999.990 1.959 ..P WKT 2011 04 27 00 11 55 31.3200 -97.3300 251.000 457.0 201.616 4.610 -999.990 -999.990 2.016 ..P WKT 2011 04 27 00 12 25 31.3200 -97.3300 251.000 457.0 196.569 4.730 -999.990 -999.990 1.966 ..P WKT 2011 04 27 00 12 55 31.3200 -97.3300 251.000 457.0 204.574 3.890 -999.990 -999.990 2.046 ..P WKT 2011 04 27 00 13 25 31.3200 -97.3300 251.000 457.0 201.676 3.790 -999.990 -999.990 2.017 ..P WKT 2011 04 27 00 13 55 31.3200 -97.3300 251.000 457.0 199.603 4.070 -999.990 -999.990 1.996 ..P WKT 2011 04 27 00 14 25 31.3200 -97.3300 251.000 457.0 195.051 3.700 -999.990 -999.990 1.951 ..P WKT 2011 04 27 00 14 55 31.3200 -97.3300 251.000 457.0 198.430 3.770 -999.990 -999.990 1.984 ..P WKT 2011 04 27 00 19 55 31.3200 -97.3300 251.000 30.0 200.004 3.820 -999.990 -999.990 2.000 ..P WKT 2011 04 27 00 24 55 31.3200 -97.3300 251.000 122.0 201.909 4.190 -999.990 -999.990 2.019 ..P WKT 2011 04 27 00 29 55 31.3200 -97.3300 251.000 457.0 197.203 3.650 -999.990 -999.990 1.972 ..P WKT 2011 04 27 00 34 55 31.3200 -97.3300 251.000 30.0 198.116 3.990 -999.990 -999.990 1.981 ..P WKT 2011 04 27 00 39 55 31.3200 -97.3300 251.000 122.0 200.021 3.640 -999.990 -999.990 2.000 ..P WKT 2011 04 27 00 44 55 31.3200 -97.3300 251.000 457.0 195.644 3.980 -999.990 -999.990 1.956 ..P WKT 2011 04 27 00 54 55 31.3200 -97.3300 251.000 30.0 194.888 3.790 -999.990 -999.990 1.949 ..P WKT 2011 04 27 00 59 55 31.3200 -97.3300 251.000 122.0 201.157 3.900 -999.990 -999.990 2.012 ..P WKT 2011 04 27 01 04 55 31.3200 -97.3300 251.000 457.0 202.629 4.030 -999.990 -999.990 2.026 ..P WKT 2011 04 27 01 09 55 31.3200 -97.3300 251.000 30.0 203.937 3.700 -999.990 -999.990 2.039 ..P WKT 2011 04 27 01 14 55 31.3200 -97.3300 251.000 122.0 208.720 3.710 -999.990 -999.990 2.087 ..P WKT 2011 04 27 01 19 55 31.3200 -97.3300 251.000 457.0 205.728 3.610 -999.990 -999.990 2.057 ..P WKT 2011 04 27 01 29 55 31.3200 -97.3300 251.000 30.0 203.240 4.050 -999.990 -999.990 2.032 ..P WKT 2011 04 27 01 34 55 31.3200 -97.3300 251.000 122.0 205.896 4.210 -999.990 -999.990 2.059 ..P WKT 2011 04 27 01 39 55 31.3200 -97.3300 251.000 457.0 212.856 4.020 -999.990 -999.990 2.129 ..P WKT 2011 04 27 01 44 55 31.3200 -97.3300 251.000 30.0 204.424 4.410 -999.990 -999.990 2.044 ..P WKT 2011 04 27 01 49 55 31.3200 -97.3300 251.000 122.0 206.254 3.870 -999.990 -999.990 2.063 ..P WKT 2011 04 27 01 54 55 31.3200 -97.3300 251.000 457.0 216.031 3.430 -999.990 -999.990 2.160 ..P WKT 2011 04 27 02 04 55 31.3200 -97.3300 251.000 30.0 204.269 3.630 -999.990 -999.990 2.043 ..P WKT 2011 04 27 02 09 55 31.3200 -97.3300 251.000 122.0 209.223 3.880 -999.990 -999.990 2.092 ..P WKT 2011 04 27 02 14 55 31.3200 -97.3300 251.000 457.0 207.552 4.270 -999.990 -999.990 2.076 ..P WKT 2011 04 27 02 19 55 31.3200 -97.3300 251.000 30.0 201.906 5.290 -999.990 -999.990 2.019 ..P WKT 2011 04 27 02 24 55 31.3200 -97.3300 251.000 122.0 210.837 3.630 -999.990 -999.990 2.108 ..P WKT 2011 04 27 02 29 55 31.3200 -97.3300 251.000 457.0 217.450 3.700 -999.990 -999.990 2.175 ..P WKT 2011 04 27 02 39 55 31.3200 -97.3300 251.000 30.0 211.361 3.760 -999.990 -999.990 2.114 ..P WKT 2011 04 27 02 44 55 31.3200 -97.3300 251.000 122.0 213.242 3.060 -999.990 -999.990 2.132 ..P WKT 2011 04 27 02 49 55 31.3200 -97.3300 251.000 457.0 207.497 3.440 -999.990 -999.990 2.075 ..P WKT 2011 04 27 02 54 55 31.3200 -97.3300 251.000 30.0 195.120 2.870 -999.990 -999.990 1.951 ..P WKT 2011 04 27 02 59 55 31.3200 -97.3300 251.000 122.0 198.657 2.900 -999.990 -999.990 1.987 ..P WKT 2011 04 27 03 04 55 31.3200 -97.3300 251.000 457.0 211.148 3.070 -999.990 -999.990 2.111 ..P WKT 2011 04 27 03 14 55 31.3200 -97.3300 251.000 30.0 195.388 4.370 -999.990 -999.990 1.954 ..P WKT 2011 04 27 03 19 55 31.3200 -97.3300 251.000 122.0 191.344 3.660 -999.990 -999.990 1.913 ..P WKT 2011 04 27 03 24 55 31.3200 -97.3300 251.000 457.0 212.181 3.570 -999.990 -999.990 2.122 ..P WKT 2011 04 27 03 29 55 31.3200 -97.3300 251.000 30.0 185.907 4.930 -999.990 -999.990 1.859 ..P WKT 2011 04 27 03 34 55 31.3200 -97.3300 251.000 122.0 185.843 3.210 -999.990 -999.990 1.858 ..P WKT 2011 04 27 03 39 55 31.3200 -97.3300 251.000 457.0 216.973 3.810 -999.990 -999.990 2.170 ..P WKT 2011 04 27 03 49 55 31.3200 -97.3300 251.000 30.0 190.060 3.280 -999.990 -999.990 1.901 ..P WKT 2011 04 27 03 54 55 31.3200 -97.3300 251.000 122.0 190.754 3.430 -999.990 -999.990 1.908 ..P WKT 2011 04 27 03 59 55 31.3200 -97.3300 251.000 457.0 220.831 5.760 -999.990 -999.990 2.208 ..P WKT 2011 04 27 04 04 55 31.3200 -97.3300 251.000 30.0 186.832 3.120 -999.990 -999.990 1.868 ..P WKT 2011 04 27 04 09 55 31.3200 -97.3300 251.000 122.0 199.315 4.030 -999.990 -999.990 1.993 ..P WKT 2011 04 27 04 14 55 31.3200 -97.3300 251.000 457.0 219.938 5.750 -999.990 -999.990 2.199 ..P WKT 2011 04 27 04 24 55 31.3200 -97.3300 251.000 30.0 188.591 4.240 -999.990 -999.990 1.886 ..P WKT 2011 04 27 04 29 55 31.3200 -97.3300 251.000 122.0 205.874 3.110 -999.990 -999.990 2.059 ..P WKT 2011 04 27 04 34 55 31.3200 -97.3300 251.000 457.0 207.544 3.210 -999.990 -999.990 2.075 ..P WKT 2011 04 27 04 39 55 31.3200 -97.3300 251.000 30.0 189.444 3.250 -999.990 -999.990 1.894 ..P WKT 2011 04 27 04 44 55 31.3200 -97.3300 251.000 122.0 215.870 4.040 -999.990 -999.990 2.159 ..P WKT 2011 04 27 04 49 55 31.3200 -97.3300 251.000 457.0 209.731 3.800 -999.990 -999.990 2.097 ..P WKT 2011 04 27 05 04 55 31.3200 -97.3300 251.000 30.0 184.997 3.310 -999.990 -999.990 1.850 ..P WKT 2011 04 27 05 09 55 31.3200 -97.3300 251.000 122.0 213.435 3.480 -999.990 -999.990 2.134 ..P WKT 2011 04 27 05 14 55 31.3200 -97.3300 251.000 457.0 208.792 3.710 -999.990 -999.990 2.088 ..P WKT 2011 04 27 05 19 55 31.3200 -97.3300 251.000 30.0 190.513 3.060 -999.990 -999.990 1.905 ..P WKT 2011 04 27 05 24 55 31.3200 -97.3300 251.000 122.0 214.304 4.230 -999.990 -999.990 2.143 ..P WKT 2011 04 27 05 29 55 31.3200 -97.3300 251.000 457.0 206.998 3.880 -999.990 -999.990 2.070 ..P WKT 2011 04 27 05 39 55 31.3200 -97.3300 251.000 30.0 185.678 3.220 -999.990 -999.990 1.857 ..P WKT 2011 04 27 05 44 55 31.3200 -97.3300 251.000 122.0 206.767 3.940 -999.990 -999.990 2.068 ..P WKT 2011 04 27 05 49 55 31.3200 -97.3300 251.000 457.0 202.734 3.670 -999.990 -999.990 2.027 ..P WKT 2011 04 27 05 54 55 31.3200 -97.3300 251.000 30.0 195.874 3.390 -999.990 -999.990 1.959 ..P WKT 2011 04 27 05 59 55 31.3200 -97.3300 251.000 122.0 214.639 3.310 -999.990 -999.990 2.146 ..P WKT 2011 04 27 06 04 55 31.3200 -97.3300 251.000 457.0 204.781 3.310 -999.990 -999.990 2.048 ..P WKT 2011 04 27 06 14 55 31.3200 -97.3300 251.000 30.0 199.804 3.690 -999.990 -999.990 1.998 ..P WKT 2011 04 27 06 19 55 31.3200 -97.3300 251.000 122.0 206.686 3.630 -999.990 -999.990 2.067 ..P WKT 2011 04 27 06 24 55 31.3200 -97.3300 251.000 457.0 203.912 4.440 -999.990 -999.990 2.039 ..P WKT 2011 04 27 06 29 55 31.3200 -97.3300 251.000 30.0 196.808 4.900 -999.990 -999.990 1.968 ..P WKT 2011 04 27 06 34 55 31.3200 -97.3300 251.000 122.0 210.353 4.610 -999.990 -999.990 2.104 ..P WKT 2011 04 27 06 39 55 31.3200 -97.3300 251.000 457.0 198.917 3.820 -999.990 -999.990 1.989 ..P WKT 2011 04 27 06 49 55 31.3200 -97.3300 251.000 30.0 202.836 4.560 -999.990 -999.990 2.028 ..P WKT 2011 04 27 06 54 55 31.3200 -97.3300 251.000 122.0 205.868 3.400 -999.990 -999.990 2.059 ..P WKT 2011 04 27 06 59 55 31.3200 -97.3300 251.000 457.0 204.568 3.570 -999.990 -999.990 2.046 ..P WKT 2011 04 27 07 04 55 31.3200 -97.3300 251.000 30.0 207.933 3.670 -999.990 -999.990 2.079 ..P WKT 2011 04 27 07 09 55 31.3200 -97.3300 251.000 122.0 206.299 3.220 -999.990 -999.990 2.063 ..P WKT 2011 04 27 07 14 55 31.3200 -97.3300 251.000 457.0 210.666 3.920 -999.990 -999.990 2.107 ..P WKT 2011 04 27 07 24 55 31.3200 -97.3300 251.000 30.0 201.348 3.710 -999.990 -999.990 2.013 ..P WKT 2011 04 27 07 29 55 31.3200 -97.3300 251.000 122.0 203.333 3.020 -999.990 -999.990 2.033 ..P WKT 2011 04 27 07 34 55 31.3200 -97.3300 251.000 457.0 204.319 3.860 -999.990 -999.990 2.043 ..P WKT 2011 04 27 07 39 55 31.3200 -97.3300 251.000 30.0 196.299 2.960 -999.990 -999.990 1.963 ..P WKT 2011 04 27 07 44 55 31.3200 -97.3300 251.000 122.0 203.287 3.120 -999.990 -999.990 2.033 ..P WKT 2011 04 27 07 49 55 31.3200 -97.3300 251.000 457.0 206.609 4.330 -999.990 -999.990 2.066 ..P WKT 2011 04 27 07 59 55 31.3200 -97.3300 251.000 30.0 206.626 3.720 -999.990 -999.990 2.066 ..P WKT 2011 04 27 08 04 55 31.3200 -97.3300 251.000 122.0 211.999 3.090 -999.990 -999.990 2.120 ..P WKT 2011 04 27 08 09 55 31.3200 -97.3300 251.000 457.0 205.023 4.870 -999.990 -999.990 2.050 ..P WKT 2011 04 27 08 14 55 31.3200 -97.3300 251.000 30.0 225.750 3.220 -999.990 -999.990 2.257 ..P WKT 2011 04 27 08 19 55 31.3200 -97.3300 251.000 122.0 231.794 5.120 -999.990 -999.990 2.318 ..P WKT 2011 04 27 08 24 55 31.3200 -97.3300 251.000 457.0 205.455 3.040 -999.990 -999.990 2.055 ..P WKT 2011 04 27 08 34 55 31.3200 -97.3300 251.000 30.0 220.427 3.370 -999.990 -999.990 2.204 ..P WKT 2011 04 27 08 39 55 31.3200 -97.3300 251.000 122.0 217.002 4.330 -999.990 -999.990 2.170 ..P WKT 2011 04 27 08 44 55 31.3200 -97.3300 251.000 457.0 225.267 4.370 -999.990 -999.990 2.253 ..P WKT 2011 04 27 08 49 55 31.3200 -97.3300 251.000 30.0 210.485 5.200 -999.990 -999.990 2.105 ..P WKT 2011 04 27 08 54 55 31.3200 -97.3300 251.000 122.0 219.251 4.040 -999.990 -999.990 2.193 ..P WKT 2011 04 27 08 59 55 31.3200 -97.3300 251.000 457.0 228.689 3.840 -999.990 -999.990 2.287 ..P WKT 2011 04 27 09 09 55 31.3200 -97.3300 251.000 30.0 212.026 4.840 -999.990 -999.990 2.120 ..P WKT 2011 04 27 09 14 55 31.3200 -97.3300 251.000 122.0 228.698 4.110 -999.990 -999.990 2.287 ..P WKT 2011 04 27 09 19 55 31.3200 -97.3300 251.000 457.0 180.865 5.170 -999.990 -999.990 1.809 ..P WKT 2011 04 27 09 24 55 31.3200 -97.3300 251.000 30.0 228.124 5.360 -999.990 -999.990 2.281 ..P WKT 2011 04 27 09 29 55 31.3200 -97.3300 251.000 122.0 221.568 4.790 -999.990 -999.990 2.216 ..P WKT 2011 04 27 09 34 55 31.3200 -97.3300 251.000 457.0 160.847 5.020 -999.990 -999.990 1.608 ..P WKT 2011 04 27 09 44 55 31.3200 -97.3300 251.000 30.0 216.631 3.990 -999.990 -999.990 2.166 ..P WKT 2011 04 27 09 49 55 31.3200 -97.3300 251.000 122.0 212.770 4.750 -999.990 -999.990 2.128 ..P WKT 2011 04 27 09 54 55 31.3200 -97.3300 251.000 457.0 159.071 5.110 -999.990 -999.990 1.591 ..P WKT 2011 04 27 09 59 55 31.3200 -97.3300 251.000 30.0 222.109 4.980 -999.990 -999.990 2.221 ..P WKT 2011 04 27 10 04 55 31.3200 -97.3300 251.000 122.0 223.266 4.470 -999.990 -999.990 2.233 ..P WKT 2011 04 27 10 09 55 31.3200 -97.3300 251.000 457.0 155.833 3.250 -999.990 -999.990 1.558 ..P WKT 2011 04 27 10 19 55 31.3200 -97.3300 251.000 30.0 224.087 3.240 -999.990 -999.990 2.241 ..P WKT 2011 04 27 10 24 55 31.3200 -97.3300 251.000 122.0 217.572 4.200 -999.990 -999.990 2.176 ..P WKT 2011 04 27 10 29 55 31.3200 -97.3300 251.000 457.0 152.811 5.250 -999.990 -999.990 1.528 ..P WKT 2011 04 27 10 34 55 31.3200 -97.3300 251.000 30.0 212.235 4.620 -999.990 -999.990 2.122 ..P WKT 2011 04 27 10 39 55 31.3200 -97.3300 251.000 122.0 212.746 4.000 -999.990 -999.990 2.127 ..P WKT 2011 04 27 10 44 55 31.3200 -97.3300 251.000 457.0 153.993 4.410 -999.990 -999.990 1.540 ..P WKT 2011 04 27 10 54 55 31.3200 -97.3300 251.000 30.0 216.675 4.220 -999.990 -999.990 2.167 ..P WKT 2011 04 27 10 59 55 31.3200 -97.3300 251.000 122.0 213.216 4.320 -999.990 -999.990 2.132 ..P WKT 2011 04 27 11 04 55 31.3200 -97.3300 251.000 457.0 148.455 4.450 -999.990 -999.990 1.485 ..P WKT 2011 04 27 11 09 55 31.3200 -97.3300 251.000 30.0 208.640 3.700 -999.990 -999.990 2.086 ..P WKT 2011 04 27 11 14 55 31.3200 -97.3300 251.000 122.0 210.205 3.780 -999.990 -999.990 2.102 ..P WKT 2011 04 27 11 19 55 31.3200 -97.3300 251.000 457.0 134.701 3.060 -999.990 -999.990 1.347 ..P WKT 2011 04 27 11 29 55 31.3200 -97.3300 251.000 30.0 206.310 4.280 -999.990 -999.990 2.063 ..P WKT 2011 04 27 11 34 55 31.3200 -97.3300 251.000 122.0 198.612 3.900 -999.990 -999.990 1.986 ..P WKT 2011 04 27 11 39 55 31.3200 -97.3300 251.000 457.0 130.573 3.830 -999.990 -999.990 1.306 ..P WKT 2011 04 27 11 44 55 31.3200 -97.3300 251.000 30.0 192.935 2.730 -999.990 -999.990 1.929 ..P WKT 2011 04 27 11 49 55 31.3200 -97.3300 251.000 122.0 185.569 3.260 -999.990 -999.990 1.856 ..P WKT 2011 04 27 12 09 55 31.3200 -97.3300 251.000 457.0 130.798 3.700 -999.990 -999.990 1.308 ..P WKT 2011 04 27 12 10 25 31.3200 -97.3300 251.000 457.0 126.784 2.200 -999.990 -999.990 1.268 ..P WKT 2011 04 27 12 10 55 31.3200 -97.3300 251.000 457.0 132.662 3.080 -999.990 -999.990 1.327 ..P WKT 2011 04 27 12 11 25 31.3200 -97.3300 251.000 457.0 133.175 2.530 -999.990 -999.990 1.332 ..P WKT 2011 04 27 12 11 55 31.3200 -97.3300 251.000 457.0 134.357 2.870 -999.990 -999.990 1.344 ..P WKT 2011 04 27 12 12 25 31.3200 -97.3300 251.000 457.0 137.385 2.300 -999.990 -999.990 1.374 ..P WKT 2011 04 27 12 12 55 31.3200 -97.3300 251.000 457.0 130.353 5.460 -999.990 -999.990 1.304 ..P WKT 2011 04 27 12 13 25 31.3200 -97.3300 251.000 457.0 128.016 3.050 -999.990 -999.990 1.280 ..P WKT 2011 04 27 12 13 55 31.3200 -97.3300 251.000 457.0 129.366 2.280 -999.990 -999.990 1.294 ..P WKT 2011 04 27 12 14 25 31.3200 -97.3300 251.000 457.0 135.579 3.440 -999.990 -999.990 1.356 ..P WKT 2011 04 27 12 14 55 31.3200 -97.3300 251.000 457.0 129.554 3.880 -999.990 -999.990 1.296 ..P WKT 2011 04 27 12 19 55 31.3200 -97.3300 251.000 30.0 186.478 2.400 -999.990 -999.990 1.865 ..P WKT 2011 04 27 12 24 55 31.3200 -97.3300 251.000 122.0 165.450 2.380 -999.990 -999.990 1.654 ..P WKT 2011 04 27 12 29 55 31.3200 -97.3300 251.000 457.0 127.665 3.030 -999.990 -999.990 1.277 ..P WKT 2011 04 27 12 34 55 31.3200 -97.3300 251.000 30.0 179.883 2.900 -999.990 -999.990 1.799 ..P WKT 2011 04 27 12 39 55 31.3200 -97.3300 251.000 122.0 164.894 3.210 -999.990 -999.990 1.649 ..P WKT 2011 04 27 12 44 55 31.3200 -97.3300 251.000 457.0 126.113 2.440 -999.990 -999.990 1.261 ..P WKT 2011 04 27 12 54 55 31.3200 -97.3300 251.000 30.0 184.377 3.770 -999.990 -999.990 1.844 ..P WKT 2011 04 27 12 59 55 31.3200 -97.3300 251.000 122.0 158.104 3.520 -999.990 -999.990 1.581 ..P WKT 2011 04 27 13 04 55 31.3200 -97.3300 251.000 457.0 134.852 2.570 -999.990 -999.990 1.349 ..P WKT 2011 04 27 13 09 55 31.3200 -97.3300 251.000 30.0 174.580 2.820 -999.990 -999.990 1.746 ..P WKT 2011 04 27 13 14 55 31.3200 -97.3300 251.000 122.0 168.747 2.880 -999.990 -999.990 1.687 ..P WKT 2011 04 27 13 19 55 31.3200 -97.3300 251.000 457.0 137.461 2.400 -999.990 -999.990 1.375 ..P WKT 2011 04 27 13 29 55 31.3200 -97.3300 251.000 30.0 172.950 3.570 -999.990 -999.990 1.729 ..P WKT 2011 04 27 13 34 55 31.3200 -97.3300 251.000 122.0 168.053 4.000 -999.990 -999.990 1.681 ..P WKT 2011 04 27 13 39 55 31.3200 -97.3300 251.000 457.0 140.054 2.170 -999.990 -999.990 1.401 ..P WKT 2011 04 27 13 44 55 31.3200 -97.3300 251.000 30.0 161.272 3.250 -999.990 -999.990 1.613 ..P WKT 2011 04 27 13 49 55 31.3200 -97.3300 251.000 122.0 158.386 2.600 -999.990 -999.990 1.584 ..P WKT 2011 04 27 13 54 55 31.3200 -97.3300 251.000 457.0 139.934 3.450 -999.990 -999.990 1.399 ..P WKT 2011 04 27 14 04 55 31.3200 -97.3300 251.000 30.0 144.063 5.620 -999.990 -999.990 1.441 ..P WKT 2011 04 27 14 09 55 31.3200 -97.3300 251.000 122.0 153.081 2.610 -999.990 -999.990 1.531 ..P WKT 2011 04 27 14 14 55 31.3200 -97.3300 251.000 457.0 147.376 2.820 -999.990 -999.990 1.474 ..P WKT 2011 04 27 14 19 55 31.3200 -97.3300 251.000 30.0 152.713 3.540 -999.990 -999.990 1.527 ..P WKT 2011 04 27 14 24 55 31.3200 -97.3300 251.000 122.0 149.016 2.840 -999.990 -999.990 1.490 ..P WKT 2011 04 27 14 29 55 31.3200 -97.3300 251.000 457.0 149.668 2.510 -999.990 -999.990 1.497 ..P WKT 2011 04 27 14 39 55 31.3200 -97.3300 251.000 30.0 144.426 2.610 -999.990 -999.990 1.444 ..P WKT 2011 04 27 14 44 55 31.3200 -97.3300 251.000 122.0 159.938 3.740 -999.990 -999.990 1.599 ..P WKT 2011 04 27 14 49 55 31.3200 -97.3300 251.000 457.0 146.687 4.270 -999.990 -999.990 1.467 ..P WKT 2011 04 27 14 54 55 31.3200 -97.3300 251.000 30.0 152.499 4.930 -999.990 -999.990 1.525 ..P WKT 2011 04 27 14 59 55 31.3200 -97.3300 251.000 122.0 148.613 3.440 -999.990 -999.990 1.486 ..P WKT 2011 04 27 15 04 55 31.3200 -97.3300 251.000 457.0 152.752 2.350 -999.990 -999.990 1.528 ..P WKT 2011 04 27 15 14 55 31.3200 -97.3300 251.000 30.0 146.319 3.840 -999.990 -999.990 1.463 ..P WKT 2011 04 27 15 19 55 31.3200 -97.3300 251.000 122.0 147.114 4.790 -999.990 -999.990 1.471 ..P WKT 2011 04 27 15 24 55 31.3200 -97.3300 251.000 457.0 144.901 4.010 -999.990 -999.990 1.449 ..P WKT 2011 04 27 15 29 55 31.3200 -97.3300 251.000 30.0 149.039 2.500 -999.990 -999.990 1.490 ..P WKT 2011 04 27 15 34 55 31.3200 -97.3300 251.000 122.0 153.176 2.070 -999.990 -999.990 1.532 ..P WKT 2011 04 27 15 39 55 31.3200 -97.3300 251.000 457.0 148.290 2.330 -999.990 -999.990 1.483 ..P WKT 2011 04 27 15 49 55 31.3200 -97.3300 251.000 30.0 145.895 2.590 -999.990 -999.990 1.459 ..P WKT 2011 04 27 15 54 55 31.3200 -97.3300 251.000 122.0 156.234 3.220 -999.990 -999.990 1.562 ..P WKT 2011 04 27 15 59 55 31.3200 -97.3300 251.000 457.0 151.541 3.600 -999.990 -999.990 1.515 ..P WKT 2011 04 27 16 04 55 31.3200 -97.3300 251.000 30.0 150.021 2.700 -999.990 -999.990 1.500 ..P WKT 2011 04 27 16 09 55 31.3200 -97.3300 251.000 122.0 151.006 2.530 -999.990 -999.990 1.510 ..P WKT 2011 04 27 16 14 55 31.3200 -97.3300 251.000 457.0 147.649 2.620 -999.990 -999.990 1.476 ..P WKT 2011 04 27 16 24 55 31.3200 -97.3300 251.000 30.0 147.569 3.090 -999.990 -999.990 1.476 ..P WKT 2011 04 27 16 29 55 31.3200 -97.3300 251.000 122.0 147.171 3.170 -999.990 -999.990 1.472 ..P WKT 2011 04 27 16 34 55 31.3200 -97.3300 251.000 457.0 143.101 2.350 -999.990 -999.990 1.431 ..P WKT 2011 04 27 16 39 55 31.3200 -97.3300 251.000 30.0 147.043 4.470 -999.990 -999.990 1.470 ..P WKT 2011 04 27 16 44 55 31.3200 -97.3300 251.000 122.0 140.971 3.760 -999.990 -999.990 1.410 ..P WKT 2011 04 27 16 49 55 31.3200 -97.3300 251.000 457.0 145.079 2.160 -999.990 -999.990 1.451 ..P WKT 2011 04 27 17 04 55 31.3200 -97.3300 251.000 30.0 149.321 2.820 -999.990 -999.990 1.493 ..P WKT 2011 04 27 17 09 55 31.3200 -97.3300 251.000 122.0 148.303 2.440 -999.990 -999.990 1.483 ..P WKT 2011 04 27 17 14 55 31.3200 -97.3300 251.000 457.0 141.781 2.850 -999.990 -999.990 1.418 ..P WKT 2011 04 27 17 19 55 31.3200 -97.3300 251.000 30.0 153.108 3.010 -999.990 -999.990 1.531 ..P WKT 2011 04 27 17 24 55 31.3200 -97.3300 251.000 122.0 152.924 2.320 -999.990 -999.990 1.529 ..P WKT 2011 04 27 17 29 55 31.3200 -97.3300 251.000 457.0 146.736 2.500 -999.990 -999.990 1.467 ..P WKT 2011 04 27 17 39 55 31.3200 -97.3300 251.000 30.0 148.991 3.040 -999.990 -999.990 1.490 ..P WKT 2011 04 27 17 44 55 31.3200 -97.3300 251.000 122.0 147.593 3.700 -999.990 -999.990 1.476 ..P WKT 2011 04 27 17 49 55 31.3200 -97.3300 251.000 457.0 149.863 4.250 -999.990 -999.990 1.499 ..P WKT 2011 04 27 17 54 55 31.3200 -97.3300 251.000 30.0 152.132 4.030 -999.990 -999.990 1.521 ..P WKT 2011 04 27 17 59 55 31.3200 -97.3300 251.000 122.0 148.734 2.880 -999.990 -999.990 1.487 ..P WKT 2011 04 27 18 04 55 31.3200 -97.3300 251.000 457.0 143.670 3.210 -999.990 -999.990 1.437 ..P WKT 2011 04 27 18 14 55 31.3200 -97.3300 251.000 30.0 150.970 2.590 -999.990 -999.990 1.510 ..P WKT 2011 04 27 18 19 55 31.3200 -97.3300 251.000 122.0 153.000 2.930 -999.990 -999.990 1.530 ..P WKT 2011 04 27 18 24 55 31.3200 -97.3300 251.000 457.0 143.368 2.790 -999.990 -999.990 1.434 ..P WKT 2011 04 27 18 29 55 31.3200 -97.3300 251.000 30.0 145.398 3.680 -999.990 -999.990 1.454 ..P WKT 2011 04 27 18 34 55 31.3200 -97.3300 251.000 122.0 152.759 4.460 -999.990 -999.990 1.528 ..P WKT 2011 04 27 18 39 55 31.3200 -97.3300 251.000 457.0 149.792 3.600 -999.990 -999.990 1.498 ..P WKT 2011 04 27 18 49 55 31.3200 -97.3300 251.000 30.0 149.473 3.110 -999.990 -999.990 1.495 ..P WKT 2011 04 27 18 54 55 31.3200 -97.3300 251.000 122.0 153.120 3.640 -999.990 -999.990 1.531 ..P WKT 2011 04 27 18 59 55 31.3200 -97.3300 251.000 457.0 147.109 3.910 -999.990 -999.990 1.471 ..P WKT 2011 04 27 19 04 55 31.3200 -97.3300 251.000 30.0 148.424 4.800 -999.990 -999.990 1.484 ..P WKT 2011 04 27 19 09 55 31.3200 -97.3300 251.000 122.0 144.412 4.350 -999.990 -999.990 1.444 ..P WKT 2011 04 27 19 14 55 31.3200 -97.3300 251.000 457.0 146.726 2.920 -999.990 -999.990 1.467 ..P WKT 2011 04 27 19 24 55 31.3200 -97.3300 251.000 30.0 143.912 2.870 -999.990 -999.990 1.439 ..P WKT 2011 04 27 19 29 55 31.3200 -97.3300 251.000 122.0 145.774 4.460 -999.990 -999.990 1.458 ..P WKT 2011 04 27 19 34 55 31.3200 -97.3300 251.000 457.0 147.637 4.960 -999.990 -999.990 1.476 ..P WKT 2011 04 27 19 39 55 31.3200 -97.3300 251.000 30.0 152.826 6.370 -999.990 -999.990 1.528 ..P WKT 2011 04 27 19 44 55 31.3200 -97.3300 251.000 122.0 152.857 5.360 -999.990 -999.990 1.529 ..P WKT 2011 04 27 19 49 55 31.3200 -97.3300 251.000 457.0 153.886 3.720 -999.990 -999.990 1.539 ..P WKT 2011 04 27 19 59 55 31.3200 -97.3300 251.000 30.0 147.341 4.310 -999.990 -999.990 1.473 ..P WKT 2011 04 27 20 04 55 31.3200 -97.3300 251.000 122.0 153.241 5.740 -999.990 -999.990 1.532 ..P WKT 2011 04 27 20 09 55 31.3200 -97.3300 251.000 457.0 149.660 6.310 -999.990 -999.990 1.497 ..P WKT 2011 04 27 20 14 55 31.3200 -97.3300 251.000 30.0 154.894 5.560 -999.990 -999.990 1.549 ..P WKT 2011 04 27 20 19 55 31.3200 -97.3300 251.000 122.0 144.995 4.110 -999.990 -999.990 1.450 ..P WKT 2011 04 27 20 24 55 31.3200 -97.3300 251.000 457.0 145.074 3.880 -999.990 -999.990 1.451 ..P WKT 2011 04 27 20 34 55 31.3200 -97.3300 251.000 30.0 146.442 2.990 -999.990 -999.990 1.464 ..P WKT 2011 04 27 20 39 55 31.3200 -97.3300 251.000 122.0 140.252 4.330 -999.990 -999.990 1.403 ..P WKT 2011 04 27 20 44 55 31.3200 -97.3300 251.000 457.0 144.202 4.800 -999.990 -999.990 1.442 ..P WKT 2011 04 27 20 49 55 31.3200 -97.3300 251.000 30.0 147.818 3.840 -999.990 -999.990 1.478 ..P WKT 2011 04 27 20 54 55 31.3200 -97.3300 251.000 122.0 148.776 3.400 -999.990 -999.990 1.488 ..P WKT 2011 04 27 20 59 55 31.3200 -97.3300 251.000 457.0 143.418 4.300 -999.990 -999.990 1.434 ..P WKT 2011 04 27 21 09 55 31.3200 -97.3300 251.000 30.0 149.510 2.350 -999.990 -999.990 1.495 ..P WKT 2011 04 27 21 14 55 31.3200 -97.3300 251.000 122.0 144.509 2.780 -999.990 -999.990 1.445 ..P WKT 2011 04 27 21 19 55 31.3200 -97.3300 251.000 457.0 147.151 3.200 -999.990 -999.990 1.472 ..P WKT 2011 04 27 21 24 55 31.3200 -97.3300 251.000 30.0 155.440 3.880 -999.990 -999.990 1.554 ..P WKT 2011 04 27 21 29 55 31.3200 -97.3300 251.000 122.0 145.125 4.150 -999.990 -999.990 1.451 ..P WKT 2011 04 27 21 34 55 31.3200 -97.3300 251.000 457.0 139.628 4.010 -999.990 -999.990 1.396 ..P WKT 2011 04 27 21 44 55 31.3200 -97.3300 251.000 30.0 144.531 3.560 -999.990 -999.990 1.445 ..P WKT 2011 04 27 21 49 55 31.3200 -97.3300 251.000 122.0 138.157 3.710 -999.990 -999.990 1.382 ..P WKT 2011 04 27 21 54 55 31.3200 -97.3300 251.000 457.0 146.397 3.270 -999.990 -999.990 1.464 ..P WKT 2011 04 27 21 59 55 31.3200 -97.3300 251.000 30.0 147.661 3.360 -999.990 -999.990 1.477 ..P WKT 2011 04 27 22 04 55 31.3200 -97.3300 251.000 122.0 144.277 3.310 -999.990 -999.990 1.443 ..P WKT 2011 04 27 22 09 55 31.3200 -97.3300 251.000 457.0 141.226 2.690 -999.990 -999.990 1.412 ..P WKT 2011 04 27 22 19 55 31.3200 -97.3300 251.000 30.0 146.885 2.870 -999.990 -999.990 1.469 ..P WKT 2011 04 27 22 24 55 31.3200 -97.3300 251.000 122.0 144.307 3.800 -999.990 -999.990 1.443 ..P WKT 2011 04 27 22 29 55 31.3200 -97.3300 251.000 457.0 134.098 2.820 -999.990 -999.990 1.341 ..P WKT 2011 04 27 22 34 55 31.3200 -97.3300 251.000 30.0 139.487 3.210 -999.990 -999.990 1.395 ..P WKT 2011 04 27 22 39 55 31.3200 -97.3300 251.000 122.0 140.894 4.640 -999.990 -999.990 1.409 ..P WKT 2011 04 27 22 44 55 31.3200 -97.3300 251.000 457.0 138.982 4.930 -999.990 -999.990 1.390 ..P WKT 2011 04 27 22 54 55 31.3200 -97.3300 251.000 30.0 140.610 2.290 -999.990 -999.990 1.406 ..P WKT 2011 04 27 22 59 55 31.3200 -97.3300 251.000 122.0 145.143 2.540 -999.990 -999.990 1.451 ..P WKT 2011 04 27 23 04 55 31.3200 -97.3300 251.000 457.0 142.379 3.100 -999.990 -999.990 1.424 ..P WKT 2011 04 27 23 09 55 31.3200 -97.3300 251.000 30.0 149.564 3.430 -999.990 -999.990 1.496 ..P WKT 2011 04 27 23 14 55 31.3200 -97.3300 251.000 122.0 149.121 2.320 -999.990 -999.990 1.491 ..P WKT 2011 04 27 23 19 55 31.3200 -97.3300 251.000 457.0 149.674 3.160 -999.990 -999.990 1.497 ..P WKT 2011 04 27 23 29 55 31.3200 -97.3300 251.000 30.0 140.077 1.970 -999.990 -999.990 1.401 ..P WKT 2011 04 27 23 34 55 31.3200 -97.3300 251.000 122.0 140.206 3.260 -999.990 -999.990 1.402 ..P WKT 2011 04 27 23 39 55 31.3200 -97.3300 251.000 457.0 145.970 2.650 -999.990 -999.990 1.460 ..P WKT 2011 04 27 23 44 55 31.3200 -97.3300 251.000 30.0 150.740 3.480 -999.990 -999.990 1.507 ..P WKT 2011 04 27 23 49 55 31.3200 -97.3300 251.000 122.0 151.531 2.630 -999.990 -999.990 1.515 ..P WKT 2011 04 28 00 09 55 31.3200 -97.3300 251.000 457.0 152.138 2.570 -999.990 -999.990 1.521 ..P WKT 2011 04 28 00 10 25 31.3200 -97.3300 251.000 457.0 152.296 2.780 -999.990 -999.990 1.523 ..P WKT 2011 04 28 00 10 55 31.3200 -97.3300 251.000 457.0 152.121 2.690 -999.990 -999.990 1.521 ..P WKT 2011 04 28 00 11 25 31.3200 -97.3300 251.000 457.0 149.628 2.660 -999.990 -999.990 1.496 ..P WKT 2011 04 28 00 11 55 31.3200 -97.3300 251.000 457.0 148.626 2.770 -999.990 -999.990 1.486 ..P WKT 2011 04 28 00 12 25 31.3200 -97.3300 251.000 457.0 154.415 4.210 -999.990 -999.990 1.544 ..P WKT 2011 04 28 00 12 55 31.3200 -97.3300 251.000 457.0 148.112 5.400 -999.990 -999.990 1.481 ..P WKT 2011 04 28 00 13 25 31.3200 -97.3300 251.000 457.0 150.257 4.140 -999.990 -999.990 1.503 ..P WKT 2011 04 28 00 13 55 31.3200 -97.3300 251.000 457.0 149.586 3.640 -999.990 -999.990 1.496 ..P WKT 2011 04 28 00 14 25 31.3200 -97.3300 251.000 457.0 144.442 2.270 -999.990 -999.990 1.444 ..P WKT 2011 04 28 00 14 55 31.3200 -97.3300 251.000 457.0 144.765 2.340 -999.990 -999.990 1.448 ..P WKT 2011 04 28 00 19 55 31.3200 -97.3300 251.000 30.0 145.509 2.450 -999.990 -999.990 1.455 ..P WKT 2011 04 28 00 24 55 31.3200 -97.3300 251.000 122.0 143.272 3.780 -999.990 -999.990 1.433 ..P WKT 2011 04 28 00 29 55 31.3200 -97.3300 251.000 457.0 146.998 3.540 -999.990 -999.990 1.470 ..P WKT 2011 04 28 00 34 55 31.3200 -97.3300 251.000 30.0 148.569 2.920 -999.990 -999.990 1.486 ..P WKT 2011 04 28 00 39 55 31.3200 -97.3300 251.000 122.0 148.320 3.570 -999.990 -999.990 1.483 ..P WKT 2011 04 28 00 44 55 31.3200 -97.3300 251.000 457.0 146.746 3.500 -999.990 -999.990 1.467 ..P WKT 2011 04 28 00 54 55 31.3200 -97.3300 251.000 30.0 145.260 3.690 -999.990 -999.990 1.453 ..P WKT 2011 04 28 00 59 55 31.3200 -97.3300 251.000 122.0 145.847 2.740 -999.990 -999.990 1.458 ..P WKT 2011 04 28 01 04 55 31.3200 -97.3300 251.000 457.0 150.571 4.130 -999.990 -999.990 1.506 ..P WKT 2011 04 28 01 09 55 31.3200 -97.3300 251.000 30.0 151.985 3.390 -999.990 -999.990 1.520 ..P WKT 2011 04 28 01 14 55 31.3200 -97.3300 251.000 122.0 147.439 2.620 -999.990 -999.990 1.474 ..P WKT 2011 04 28 01 19 55 31.3200 -97.3300 251.000 457.0 144.052 2.270 -999.990 -999.990 1.441 ..P WKT 2011 04 28 01 29 55 31.3200 -97.3300 251.000 30.0 148.629 2.400 -999.990 -999.990 1.486 ..P WKT 2011 04 28 01 34 55 31.3200 -97.3300 251.000 122.0 145.337 3.190 -999.990 -999.990 1.453 ..P WKT 2011 04 28 01 39 55 31.3200 -97.3300 251.000 457.0 153.631 4.330 -999.990 -999.990 1.536 ..P WKT 2011 04 28 01 44 55 31.3200 -97.3300 251.000 30.0 151.497 3.530 -999.990 -999.990 1.515 ..P WKT 2011 04 28 01 49 55 31.3200 -97.3300 251.000 122.0 155.652 3.160 -999.990 -999.990 1.557 ..P WKT 2011 04 28 01 54 55 31.3200 -97.3300 251.000 457.0 155.835 2.870 -999.990 -999.990 1.558 ..P WKT 2011 04 28 02 04 55 31.3200 -97.3300 251.000 30.0 153.059 2.710 -999.990 -999.990 1.531 ..P WKT 2011 04 28 02 09 55 31.3200 -97.3300 251.000 122.0 155.062 2.500 -999.990 -999.990 1.551 ..P WKT 2011 04 28 02 14 55 31.3200 -97.3300 251.000 457.0 154.419 2.870 -999.990 -999.990 1.544 ..P WKT 2011 04 28 02 19 55 31.3200 -97.3300 251.000 30.0 152.451 2.780 -999.990 -999.990 1.525 ..P WKT 2011 04 28 02 24 55 31.3200 -97.3300 251.000 122.0 152.470 3.780 -999.990 -999.990 1.525 ..P WKT 2011 04 28 02 29 55 31.3200 -97.3300 251.000 457.0 147.857 2.450 -999.990 -999.990 1.479 ..P WKT 2011 04 28 02 39 55 31.3200 -97.3300 251.000 30.0 147.941 2.660 -999.990 -999.990 1.479 ..P WKT 2011 04 28 02 44 55 31.3200 -97.3300 251.000 122.0 145.031 3.450 -999.990 -999.990 1.450 ..P WKT 2011 04 28 02 49 55 31.3200 -97.3300 251.000 457.0 144.435 2.880 -999.990 -999.990 1.444 ..P WKT 2011 04 28 02 54 55 31.3200 -97.3300 251.000 30.0 148.469 3.470 -999.990 -999.990 1.485 ..P WKT 2011 04 28 02 59 55 31.3200 -97.3300 251.000 122.0 143.244 3.000 -999.990 -999.990 1.432 ..P WKT 2011 04 28 03 04 55 31.3200 -97.3300 251.000 457.0 147.938 3.460 -999.990 -999.990 1.479 ..P WKT 2011 04 28 03 14 55 31.3200 -97.3300 251.000 30.0 147.149 3.380 -999.990 -999.990 1.471 ..P WKT 2011 04 28 03 19 55 31.3200 -97.3300 251.000 122.0 150.260 3.080 -999.990 -999.990 1.503 ..P WKT 2011 04 28 03 24 55 31.3200 -97.3300 251.000 457.0 157.669 3.010 -999.990 -999.990 1.577 ..P WKT 2011 04 28 03 29 55 31.3200 -97.3300 251.000 30.0 144.583 4.000 -999.990 -999.990 1.446 ..P WKT 2011 04 28 03 34 55 31.3200 -97.3300 251.000 122.0 155.957 3.630 -999.990 -999.990 1.560 ..P WKT 2011 04 28 03 39 55 31.3200 -97.3300 251.000 457.0 156.753 4.090 -999.990 -999.990 1.568 ..P WKT 2011 04 28 03 49 55 31.3200 -97.3300 251.000 30.0 151.195 3.520 -999.990 -999.990 1.512 ..P WKT 2011 04 28 03 54 55 31.3200 -97.3300 251.000 122.0 151.284 3.330 -999.990 -999.990 1.513 ..P WKT 2011 04 28 03 59 55 31.3200 -97.3300 251.000 457.0 146.252 3.100 -999.990 -999.990 1.463 ..P WKT 2011 04 28 04 04 55 31.3200 -97.3300 251.000 30.0 156.252 3.600 -999.990 -999.990 1.563 ..P WKT 2011 04 28 04 09 55 31.3200 -97.3300 251.000 122.0 147.587 3.460 -999.990 -999.990 1.476 ..P WKT 2011 04 28 04 14 55 31.3200 -97.3300 251.000 457.0 151.310 3.750 -999.990 -999.990 1.513 ..P WKT 2011 04 28 04 24 55 31.3200 -97.3300 251.000 30.0 151.440 3.860 -999.990 -999.990 1.514 ..P WKT 2011 04 28 04 29 55 31.3200 -97.3300 251.000 122.0 152.143 3.690 -999.990 -999.990 1.521 ..P WKT 2011 04 28 04 34 55 31.3200 -97.3300 251.000 457.0 142.277 3.500 -999.990 -999.990 1.423 ..P WKT 2011 04 28 04 39 55 31.3200 -97.3300 251.000 30.0 154.373 4.340 -999.990 -999.990 1.544 ..P WKT 2011 04 28 04 44 55 31.3200 -97.3300 251.000 122.0 152.432 4.050 -999.990 -999.990 1.524 ..P WKT 2011 04 28 04 49 55 31.3200 -97.3300 251.000 457.0 138.277 5.350 -999.990 -999.990 1.383 ..P WKT 2011 04 28 05 04 55 31.3200 -97.3300 251.000 30.0 152.334 3.430 -999.990 -999.990 1.523 ..P WKT 2011 04 28 05 09 55 31.3200 -97.3300 251.000 122.0 151.913 3.330 -999.990 -999.990 1.519 ..P WKT 2011 04 28 05 14 55 31.3200 -97.3300 251.000 457.0 146.706 3.880 -999.990 -999.990 1.467 ..P WKT 2011 04 28 05 19 55 31.3200 -97.3300 251.000 30.0 150.576 4.960 -999.990 -999.990 1.506 ..P WKT 2011 04 28 05 24 55 31.3200 -97.3300 251.000 122.0 155.436 3.290 -999.990 -999.990 1.554 ..P WKT 2011 04 28 05 29 55 31.3200 -97.3300 251.000 457.0 142.804 3.540 -999.990 -999.990 1.428 ..P WKT 2011 04 28 05 39 55 31.3200 -97.3300 251.000 30.0 150.769 3.480 -999.990 -999.990 1.508 ..P WKT 2011 04 28 05 44 55 31.3200 -97.3300 251.000 122.0 157.669 4.440 -999.990 -999.990 1.577 ..P WKT 2011 04 28 05 49 55 31.3200 -97.3300 251.000 457.0 135.865 3.630 -999.990 -999.990 1.359 ..P WKT 2011 04 28 05 54 55 31.3200 -97.3300 251.000 30.0 147.384 4.610 -999.990 -999.990 1.474 ..P WKT 2011 04 28 05 59 55 31.3200 -97.3300 251.000 122.0 163.190 4.390 -999.990 -999.990 1.632 ..P WKT 2011 04 28 06 04 55 31.3200 -97.3300 251.000 457.0 141.718 4.780 -999.990 -999.990 1.417 ..P WKT 2011 04 28 06 14 55 31.3200 -97.3300 251.000 30.0 156.692 4.750 -999.990 -999.990 1.567 ..P WKT 2011 04 28 06 19 55 31.3200 -97.3300 251.000 122.0 154.873 5.410 -999.990 -999.990 1.549 ..P WKT 2011 04 28 06 24 55 31.3200 -97.3300 251.000 457.0 135.245 4.390 -999.990 -999.990 1.352 ..P WKT 2011 04 28 06 29 55 31.3200 -97.3300 251.000 30.0 144.639 4.150 -999.990 -999.990 1.446 ..P WKT 2011 04 28 06 34 55 31.3200 -97.3300 251.000 122.0 149.415 3.970 -999.990 -999.990 1.494 ..P WKT 2011 04 28 06 39 55 31.3200 -97.3300 251.000 457.0 143.310 4.020 -999.990 -999.990 1.433 ..P WKT 2011 04 28 06 49 55 31.3200 -97.3300 251.000 30.0 151.588 3.680 -999.990 -999.990 1.516 ..P WKT 2011 04 28 06 54 55 31.3200 -97.3300 251.000 122.0 148.498 3.590 -999.990 -999.990 1.485 ..P WKT 2011 04 28 06 59 55 31.3200 -97.3300 251.000 457.0 142.441 3.730 -999.990 -999.990 1.424 ..P WKT 2011 04 28 07 04 55 31.3200 -97.3300 251.000 30.0 151.878 3.490 -999.990 -999.990 1.519 ..P WKT 2011 04 28 07 09 55 31.3200 -97.3300 251.000 122.0 155.709 4.170 -999.990 -999.990 1.557 ..P WKT 2011 04 28 07 14 55 31.3200 -97.3300 251.000 457.0 144.381 3.340 -999.990 -999.990 1.444 ..P WKT 2011 04 28 07 24 55 31.3200 -97.3300 251.000 30.0 155.810 3.690 -999.990 -999.990 1.558 ..P WKT 2011 04 28 07 29 55 31.3200 -97.3300 251.000 122.0 150.885 3.630 -999.990 -999.990 1.509 ..P WKT 2011 04 28 07 34 55 31.3200 -97.3300 251.000 457.0 145.467 4.480 -999.990 -999.990 1.455 ..P WKT 2011 04 28 07 39 55 31.3200 -97.3300 251.000 30.0 157.016 4.400 -999.990 -999.990 1.570 ..P WKT 2011 04 28 07 44 55 31.3200 -97.3300 251.000 122.0 155.057 4.500 -999.990 -999.990 1.551 ..P WKT 2011 04 28 07 49 55 31.3200 -97.3300 251.000 457.0 146.345 5.150 -999.990 -999.990 1.463 ..P WKT 2011 04 28 07 59 55 31.3200 -97.3300 251.000 30.0 155.911 4.730 -999.990 -999.990 1.559 ..P WKT 2011 04 28 08 04 55 31.3200 -97.3300 251.000 122.0 168.750 5.150 -999.990 -999.990 1.688 ..P WKT 2011 04 28 08 09 55 31.3200 -97.3300 251.000 457.0 140.915 4.120 -999.990 -999.990 1.409 ..P WKT 2011 04 28 08 14 55 31.3200 -97.3300 251.000 30.0 161.492 4.040 -999.990 -999.990 1.615 ..P WKT 2011 04 28 08 19 55 31.3200 -97.3300 251.000 122.0 163.132 4.270 -999.990 -999.990 1.631 ..P WKT 2011 04 28 08 24 55 31.3200 -97.3300 251.000 457.0 140.572 5.180 -999.990 -999.990 1.406 ..P WKT 2011 04 28 08 34 55 31.3200 -97.3300 251.000 30.0 154.883 3.900 -999.990 -999.990 1.549 ..P WKT 2011 04 28 08 39 55 31.3200 -97.3300 251.000 122.0 155.700 4.050 -999.990 -999.990 1.557 ..P WKT 2011 04 28 08 44 55 31.3200 -97.3300 251.000 457.0 138.413 4.140 -999.990 -999.990 1.384 ..P WKT 2011 04 28 08 49 55 31.3200 -97.3300 251.000 30.0 156.018 4.470 -999.990 -999.990 1.560 ..P WKT 2011 04 28 08 54 55 31.3200 -97.3300 251.000 122.0 155.848 4.920 -999.990 -999.990 1.558 ..P WKT 2011 04 28 08 59 55 31.3200 -97.3300 251.000 457.0 139.386 4.700 -999.990 -999.990 1.394 ..P WKT 2011 04 28 09 09 55 31.3200 -97.3300 251.000 30.0 167.653 6.000 -999.990 -999.990 1.677 ..P WKT 2011 04 28 09 14 55 31.3200 -97.3300 251.000 122.0 162.523 4.360 -999.990 -999.990 1.625 ..P WKT 2011 04 28 09 19 55 31.3200 -97.3300 251.000 457.0 138.310 4.550 -999.990 -999.990 1.383 ..P WKT 2011 04 28 09 24 55 31.3200 -97.3300 251.000 30.0 160.325 4.460 -999.990 -999.990 1.603 ..P WKT 2011 04 28 09 29 55 31.3200 -97.3300 251.000 122.0 160.132 4.490 -999.990 -999.990 1.601 ..P WKT 2011 04 28 09 34 55 31.3200 -97.3300 251.000 457.0 134.278 4.290 -999.990 -999.990 1.343 ..P WKT 2011 04 28 09 44 55 31.3200 -97.3300 251.000 30.0 154.945 4.150 -999.990 -999.990 1.549 ..P WKT 2011 04 28 09 49 55 31.3200 -97.3300 251.000 122.0 149.981 5.990 -999.990 -999.990 1.500 ..P WKT 2011 04 28 09 54 55 31.3200 -97.3300 251.000 457.0 134.824 4.360 -999.990 -999.990 1.348 ..P WKT 2011 04 28 09 59 55 31.3200 -97.3300 251.000 30.0 159.790 4.100 -999.990 -999.990 1.598 ..P WKT 2011 04 28 10 04 55 31.3200 -97.3300 251.000 122.0 151.539 4.060 -999.990 -999.990 1.515 ..P WKT 2011 04 28 10 09 55 31.3200 -97.3300 251.000 457.0 136.713 3.990 -999.990 -999.990 1.367 ..P WKT 2011 04 28 10 19 55 31.3200 -97.3300 251.000 30.0 155.773 4.400 -999.990 -999.990 1.558 ..P WKT 2011 04 28 10 24 55 31.3200 -97.3300 251.000 122.0 152.175 4.280 -999.990 -999.990 1.522 ..P WKT 2011 04 28 10 29 55 31.3200 -97.3300 251.000 457.0 136.413 4.210 -999.990 -999.990 1.364 ..P WKT 2011 04 28 10 34 55 31.3200 -97.3300 251.000 30.0 169.303 4.610 -999.990 -999.990 1.693 ..P WKT 2011 04 28 10 39 55 31.3200 -97.3300 251.000 122.0 146.970 4.110 -999.990 -999.990 1.470 ..P WKT 2011 04 28 10 44 55 31.3200 -97.3300 251.000 457.0 137.456 4.660 -999.990 -999.990 1.375 ..P WKT 2011 04 28 10 54 55 31.3200 -97.3300 251.000 30.0 156.507 4.180 -999.990 -999.990 1.565 ..P WKT 2011 04 28 10 59 55 31.3200 -97.3300 251.000 122.0 140.377 4.460 -999.990 -999.990 1.404 ..P WKT 2011 04 28 11 04 55 31.3200 -97.3300 251.000 457.0 135.749 4.720 -999.990 -999.990 1.357 ..P WKT 2011 04 28 11 09 55 31.3200 -97.3300 251.000 30.0 154.448 5.430 -999.990 -999.990 1.544 ..P WKT 2011 04 28 11 14 55 31.3200 -97.3300 251.000 122.0 145.877 4.620 -999.990 -999.990 1.459 ..P WKT 2011 04 28 11 19 55 31.3200 -97.3300 251.000 457.0 133.366 4.690 -999.990 -999.990 1.334 ..P WKT 2011 04 28 11 29 55 31.3200 -97.3300 251.000 30.0 152.833 5.990 -999.990 -999.990 1.528 ..P WKT 2011 04 28 11 34 55 31.3200 -97.3300 251.000 122.0 146.051 4.890 -999.990 -999.990 1.461 ..P WKT 2011 04 28 11 39 55 31.3200 -97.3300 251.000 457.0 135.657 5.040 -999.990 -999.990 1.357 ..P WKT 2011 04 28 11 44 55 31.3200 -97.3300 251.000 30.0 158.596 4.580 -999.990 -999.990 1.586 ..P WKT 2011 04 28 11 49 55 31.3200 -97.3300 251.000 122.0 151.650 6.000 -999.990 -999.990 1.517 ..P WKT 2011 04 28 12 09 55 31.3200 -97.3300 251.000 457.0 134.258 4.950 -999.990 -999.990 1.343 ..P WKT 2011 04 28 12 10 25 31.3200 -97.3300 251.000 457.0 137.206 4.410 -999.990 -999.990 1.372 ..P WKT 2011 04 28 12 10 55 31.3200 -97.3300 251.000 457.0 133.258 5.710 -999.990 -999.990 1.333 ..P WKT 2011 04 28 12 11 25 31.3200 -97.3300 251.000 457.0 132.922 4.940 -999.990 -999.990 1.329 ..P WKT 2011 04 28 12 11 55 31.3200 -97.3300 251.000 457.0 132.914 4.570 -999.990 -999.990 1.329 ..P WKT 2011 04 28 12 12 25 31.3200 -97.3300 251.000 457.0 132.414 4.770 -999.990 -999.990 1.324 ..P WKT 2011 04 28 12 12 55 31.3200 -97.3300 251.000 457.0 129.286 4.610 -999.990 -999.990 1.293 ..P WKT 2011 04 28 12 13 25 31.3200 -97.3300 251.000 457.0 135.190 4.970 -999.990 -999.990 1.352 ..P WKT 2011 04 28 12 13 55 31.3200 -97.3300 251.000 457.0 138.467 4.420 -999.990 -999.990 1.385 ..P WKT 2011 04 28 12 14 25 31.3200 -97.3300 251.000 457.0 137.967 4.990 -999.990 -999.990 1.380 ..P WKT 2011 04 28 12 14 55 31.3200 -97.3300 251.000 457.0 137.795 5.470 -999.990 -999.990 1.378 ..P WKT 2011 04 28 12 19 55 31.3200 -97.3300 251.000 30.0 157.428 4.640 -999.990 -999.990 1.574 ..P WKT 2011 04 28 12 24 55 31.3200 -97.3300 251.000 122.0 145.200 5.520 -999.990 -999.990 1.452 ..P WKT 2011 04 28 12 29 55 31.3200 -97.3300 251.000 457.0 138.556 5.060 -999.990 -999.990 1.386 ..P WKT 2011 04 28 12 34 55 31.3200 -97.3300 251.000 30.0 155.894 4.560 -999.990 -999.990 1.559 ..P WKT 2011 04 28 12 39 55 31.3200 -97.3300 251.000 122.0 143.663 4.800 -999.990 -999.990 1.437 ..P WKT 2011 04 28 12 44 55 31.3200 -97.3300 251.000 457.0 133.730 4.580 -999.990 -999.990 1.337 ..P WKT 2011 04 28 12 54 55 31.3200 -97.3300 251.000 30.0 159.003 5.160 -999.990 -999.990 1.590 ..P WKT 2011 04 28 12 59 55 31.3200 -97.3300 251.000 122.0 146.225 4.690 -999.990 -999.990 1.462 ..P WKT 2011 04 28 13 04 55 31.3200 -97.3300 251.000 457.0 133.444 5.180 -999.990 -999.990 1.334 ..P WKT 2011 04 28 13 09 55 31.3200 -97.3300 251.000 30.0 158.965 5.940 -999.990 -999.990 1.590 ..P WKT 2011 04 28 13 14 55 31.3200 -97.3300 251.000 122.0 147.005 5.170 -999.990 -999.990 1.470 ..P WKT 2011 04 28 13 19 55 31.3200 -97.3300 251.000 457.0 134.877 4.320 -999.990 -999.990 1.349 ..P WKT 2011 04 28 13 29 55 31.3200 -97.3300 251.000 30.0 165.266 4.230 -999.990 -999.990 1.653 ..P WKT 2011 04 28 13 34 55 31.3200 -97.3300 251.000 122.0 154.663 4.740 -999.990 -999.990 1.547 ..P WKT 2011 04 28 13 39 55 31.3200 -97.3300 251.000 457.0 138.466 4.730 -999.990 -999.990 1.385 ..P WKT 2011 04 28 13 44 55 31.3200 -97.3300 251.000 30.0 154.512 5.000 -999.990 -999.990 1.545 ..P WKT 2011 04 28 13 49 55 31.3200 -97.3300 251.000 122.0 153.120 4.870 -999.990 -999.990 1.531 ..P WKT 2011 04 28 13 54 55 31.3200 -97.3300 251.000 457.0 144.158 4.840 -999.990 -999.990 1.442 ..P WKT 2011 04 28 14 04 55 31.3200 -97.3300 251.000 30.0 150.352 5.490 -999.990 -999.990 1.504 ..P WKT 2011 04 28 14 09 55 31.3200 -97.3300 251.000 122.0 152.345 5.270 -999.990 -999.990 1.523 ..P WKT 2011 04 28 14 14 55 31.3200 -97.3300 251.000 457.0 141.497 4.950 -999.990 -999.990 1.415 ..P WKT 2011 04 28 14 19 55 31.3200 -97.3300 251.000 30.0 149.088 4.640 -999.990 -999.990 1.491 ..P WKT 2011 04 28 14 24 55 31.3200 -97.3300 251.000 122.0 148.447 4.780 -999.990 -999.990 1.484 ..P WKT 2011 04 28 14 29 55 31.3200 -97.3300 251.000 457.0 138.913 4.560 -999.990 -999.990 1.389 ..P WKT 2011 04 28 14 39 55 31.3200 -97.3300 251.000 30.0 145.017 4.360 -999.990 -999.990 1.450 ..P WKT 2011 04 28 14 44 55 31.3200 -97.3300 251.000 122.0 142.210 4.150 -999.990 -999.990 1.422 ..P WKT 2011 04 28 14 49 55 31.3200 -97.3300 251.000 457.0 133.471 5.220 -999.990 -999.990 1.335 ..P WKT 2011 04 28 14 54 55 31.3200 -97.3300 251.000 30.0 142.526 5.070 -999.990 -999.990 1.425 ..P WKT 2011 04 28 14 59 55 31.3200 -97.3300 251.000 122.0 141.695 4.960 -999.990 -999.990 1.417 ..P WKT 2011 04 28 15 04 55 31.3200 -97.3300 251.000 457.0 141.523 4.300 -999.990 -999.990 1.415 ..P WKT 2011 04 28 15 14 55 31.3200 -97.3300 251.000 30.0 142.593 4.550 -999.990 -999.990 1.426 ..P WKT 2011 04 28 15 19 55 31.3200 -97.3300 251.000 122.0 140.537 4.680 -999.990 -999.990 1.405 ..P WKT 2011 04 28 15 24 55 31.3200 -97.3300 251.000 457.0 134.030 5.070 -999.990 -999.990 1.340 ..P WKT 2011 04 28 15 29 55 31.3200 -97.3300 251.000 30.0 137.744 4.570 -999.990 -999.990 1.377 ..P WKT 2011 04 28 15 34 55 31.3200 -97.3300 251.000 122.0 141.459 4.630 -999.990 -999.990 1.415 ..P WKT 2011 04 28 15 39 55 31.3200 -97.3300 251.000 457.0 131.321 4.670 -999.990 -999.990 1.313 ..P WKT 2011 04 28 15 49 55 31.3200 -97.3300 251.000 30.0 142.027 4.910 -999.990 -999.990 1.420 ..P WKT 2011 04 28 15 54 55 31.3200 -97.3300 251.000 122.0 141.266 4.680 -999.990 -999.990 1.413 ..P WKT 2011 04 28 15 59 55 31.3200 -97.3300 251.000 457.0 147.105 4.710 -999.990 -999.990 1.471 ..P WKT 2011 04 28 16 04 55 31.3200 -97.3300 251.000 30.0 147.995 4.860 -999.990 -999.990 1.480 ..P WKT 2011 04 28 16 09 55 31.3200 -97.3300 251.000 122.0 150.370 4.920 -999.990 -999.990 1.504 ..P WKT 2011 04 28 16 14 55 31.3200 -97.3300 251.000 457.0 144.823 5.010 -999.990 -999.990 1.448 ..P WKT 2011 04 28 16 24 55 31.3200 -97.3300 251.000 30.0 146.768 4.360 -999.990 -999.990 1.468 ..P WKT 2011 04 28 16 29 55 31.3200 -97.3300 251.000 122.0 149.969 4.880 -999.990 -999.990 1.500 ..P WKT 2011 04 28 16 34 55 31.3200 -97.3300 251.000 457.0 144.255 4.360 -999.990 -999.990 1.443 ..P WKT 2011 04 28 16 39 55 31.3200 -97.3300 251.000 30.0 142.337 5.330 -999.990 -999.990 1.423 ..P WKT 2011 04 28 16 44 55 31.3200 -97.3300 251.000 122.0 147.686 4.820 -999.990 -999.990 1.477 ..P WKT 2011 04 28 16 49 55 31.3200 -97.3300 251.000 457.0 149.073 4.900 -999.990 -999.990 1.491 ..P WKT 2011 04 28 17 04 55 31.3200 -97.3300 251.000 30.0 145.454 4.680 -999.990 -999.990 1.455 ..P WKT 2011 04 28 17 09 55 31.3200 -97.3300 251.000 122.0 154.188 4.810 -999.990 -999.990 1.542 ..P WKT 2011 04 28 17 14 55 31.3200 -97.3300 251.000 457.0 156.809 4.770 -999.990 -999.990 1.568 ..P WKT 2011 04 28 17 19 55 31.3200 -97.3300 251.000 30.0 156.951 5.350 -999.990 -999.990 1.570 ..P WKT 2011 04 28 17 24 55 31.3200 -97.3300 251.000 122.0 153.787 4.320 -999.990 -999.990 1.538 ..P WKT 2011 04 28 17 29 55 31.3200 -97.3300 251.000 457.0 147.813 4.490 -999.990 -999.990 1.478 ..P WKT 2011 04 28 17 39 55 31.3200 -97.3300 251.000 30.0 146.862 4.690 -999.990 -999.990 1.469 ..P WKT 2011 04 28 17 44 55 31.3200 -97.3300 251.000 122.0 143.619 4.650 -999.990 -999.990 1.436 ..P WKT 2011 04 28 17 49 55 31.3200 -97.3300 251.000 457.0 146.991 4.510 -999.990 -999.990 1.470 ..P WKT 2011 04 28 17 54 55 31.3200 -97.3300 251.000 30.0 146.063 5.070 -999.990 -999.990 1.461 ..P WKT 2011 04 28 17 59 55 31.3200 -97.3300 251.000 122.0 154.068 4.910 -999.990 -999.990 1.541 ..P WKT 2011 04 28 18 04 55 31.3200 -97.3300 251.000 457.0 143.214 5.400 -999.990 -999.990 1.432 ..P WKT 2011 04 28 18 14 55 31.3200 -97.3300 251.000 30.0 142.303 5.200 -999.990 -999.990 1.423 ..P WKT 2011 04 28 18 19 55 31.3200 -97.3300 251.000 122.0 148.609 4.870 -999.990 -999.990 1.486 ..P WKT 2011 04 28 18 24 55 31.3200 -97.3300 251.000 457.0 145.316 5.100 -999.990 -999.990 1.453 ..P WKT 2011 04 28 18 29 55 31.3200 -97.3300 251.000 30.0 156.257 5.230 -999.990 -999.990 1.563 ..P WKT 2011 04 28 18 34 55 31.3200 -97.3300 251.000 122.0 157.931 4.820 -999.990 -999.990 1.579 ..P WKT 2011 04 28 18 39 55 31.3200 -97.3300 251.000 457.0 153.315 4.460 -999.990 -999.990 1.533 ..P WKT 2011 04 28 18 49 55 31.3200 -97.3300 251.000 30.0 160.754 6.200 -999.990 -999.990 1.608 ..P WKT 2011 04 28 18 54 55 31.3200 -97.3300 251.000 122.0 152.942 4.680 -999.990 -999.990 1.529 ..P WKT 2011 04 28 18 59 55 31.3200 -97.3300 251.000 457.0 157.716 4.770 -999.990 -999.990 1.577 ..P WKT 2011 04 28 19 04 55 31.3200 -97.3300 251.000 30.0 159.510 5.360 -999.990 -999.990 1.595 ..P WKT 2011 04 28 19 09 55 31.3200 -97.3300 251.000 122.0 155.671 4.820 -999.990 -999.990 1.557 ..P WKT 2011 04 28 19 14 55 31.3200 -97.3300 251.000 457.0 156.470 5.100 -999.990 -999.990 1.565 ..P WKT 2011 04 28 19 24 55 31.3200 -97.3300 251.000 30.0 150.138 5.030 -999.990 -999.990 1.501 ..P WKT 2011 04 28 19 29 55 31.3200 -97.3300 251.000 122.0 152.453 5.300 -999.990 -999.990 1.525 ..P WKT 2011 04 28 19 34 55 31.3200 -97.3300 251.000 457.0 153.607 5.220 -999.990 -999.990 1.536 ..P WKT 2011 04 28 19 39 55 31.3200 -97.3300 251.000 30.0 149.623 4.790 -999.990 -999.990 1.496 ..P WKT 2011 04 28 19 44 55 31.3200 -97.3300 251.000 122.0 163.212 4.610 -999.990 -999.990 1.632 ..P WKT 2011 04 28 19 49 55 31.3200 -97.3300 251.000 457.0 157.405 5.520 -999.990 -999.990 1.574 ..P WKT 2011 04 28 19 59 55 31.3200 -97.3300 251.000 30.0 162.465 5.260 -999.990 -999.990 1.625 ..P WKT 2011 04 28 20 04 55 31.3200 -97.3300 251.000 122.0 164.048 4.460 -999.990 -999.990 1.640 ..P WKT 2011 04 28 20 09 55 31.3200 -97.3300 251.000 457.0 151.034 5.360 -999.990 -999.990 1.510 ..P WKT 2011 04 28 20 14 55 31.3200 -97.3300 251.000 30.0 160.081 4.550 -999.990 -999.990 1.601 ..P WKT 2011 04 28 20 19 55 31.3200 -97.3300 251.000 122.0 158.013 4.330 -999.990 -999.990 1.580 ..P WKT 2011 04 28 20 24 55 31.3200 -97.3300 251.000 457.0 155.116 4.440 -999.990 -999.990 1.551 ..P WKT 2011 04 28 20 34 55 31.3200 -97.3300 251.000 30.0 157.050 4.830 -999.990 -999.990 1.571 ..P WKT 2011 04 28 20 39 55 31.3200 -97.3300 251.000 122.0 161.550 5.240 -999.990 -999.990 1.616 ..P WKT 2011 04 28 20 44 55 31.3200 -97.3300 251.000 457.0 148.621 5.260 -999.990 -999.990 1.486 ..P WKT 2011 04 28 20 49 55 31.3200 -97.3300 251.000 30.0 155.279 4.940 -999.990 -999.990 1.553 ..P WKT 2011 04 28 20 54 55 31.3200 -97.3300 251.000 122.0 148.657 5.040 -999.990 -999.990 1.487 ..P WKT 2011 04 28 20 59 55 31.3200 -97.3300 251.000 457.0 150.334 5.700 -999.990 -999.990 1.503 ..P WKT 2011 04 28 21 09 55 31.3200 -97.3300 251.000 30.0 155.258 5.480 -999.990 -999.990 1.553 ..P WKT 2011 04 28 21 14 55 31.3200 -97.3300 251.000 122.0 148.537 5.100 -999.990 -999.990 1.485 ..P WKT 2011 04 28 21 19 55 31.3200 -97.3300 251.000 457.0 140.320 5.060 -999.990 -999.990 1.403 ..P WKT 2011 04 28 21 24 55 31.3200 -97.3300 251.000 30.0 145.392 4.760 -999.990 -999.990 1.454 ..P WKT 2011 04 28 21 29 55 31.3200 -97.3300 251.000 122.0 144.483 4.790 -999.990 -999.990 1.445 ..P WKT 2011 04 28 21 34 55 31.3200 -97.3300 251.000 457.0 147.231 5.120 -999.990 -999.990 1.472 ..P WKT 2011 04 28 21 44 55 31.3200 -97.3300 251.000 30.0 143.300 4.530 -999.990 -999.990 1.433 ..P WKT 2011 04 28 21 49 55 31.3200 -97.3300 251.000 122.0 142.937 4.750 -999.990 -999.990 1.429 ..P WKT 2011 04 28 21 54 55 31.3200 -97.3300 251.000 457.0 133.597 4.820 -999.990 -999.990 1.336 ..P WKT 2011 04 28 21 59 55 31.3200 -97.3300 251.000 30.0 142.211 5.330 -999.990 -999.990 1.422 ..P WKT 2011 04 28 22 04 55 31.3200 -97.3300 251.000 122.0 146.836 4.850 -999.990 -999.990 1.468 ..P WKT 2011 04 28 22 09 55 31.3200 -97.3300 251.000 457.0 138.823 4.960 -999.990 -999.990 1.388 ..P WKT 2011 04 28 22 19 55 31.3200 -97.3300 251.000 30.0 140.948 5.680 -999.990 -999.990 1.409 ..P WKT 2011 04 28 22 24 55 31.3200 -97.3300 251.000 122.0 143.104 4.840 -999.990 -999.990 1.431 ..P WKT 2011 04 28 22 29 55 31.3200 -97.3300 251.000 457.0 139.271 4.650 -999.990 -999.990 1.393 ..P WKT 2011 04 28 22 34 55 31.3200 -97.3300 251.000 30.0 133.773 5.130 -999.990 -999.990 1.338 ..P WKT 2011 04 28 22 39 55 31.3200 -97.3300 251.000 122.0 141.918 4.490 -999.990 -999.990 1.419 ..P WKT 2011 04 28 22 44 55 31.3200 -97.3300 251.000 457.0 134.756 4.370 -999.990 -999.990 1.348 ..P WKT 2011 04 28 22 54 55 31.3200 -97.3300 251.000 30.0 137.832 4.510 -999.990 -999.990 1.378 ..P WKT 2011 04 28 22 59 55 31.3200 -97.3300 251.000 122.0 144.412 4.310 -999.990 -999.990 1.444 ..P WKT 2011 04 28 23 04 55 31.3200 -97.3300 251.000 457.0 138.673 5.570 -999.990 -999.990 1.387 ..P WKT 2011 04 28 23 09 55 31.3200 -97.3300 251.000 30.0 141.258 4.610 -999.990 -999.990 1.413 ..P WKT 2011 04 28 23 14 55 31.3200 -97.3300 251.000 122.0 142.845 4.390 -999.990 -999.990 1.428 ..P WKT 2011 04 28 23 19 55 31.3200 -97.3300 251.000 457.0 139.603 5.120 -999.990 -999.990 1.396 ..P WKT 2011 04 28 23 29 55 31.3200 -97.3300 251.000 30.0 137.959 4.930 -999.990 -999.990 1.380 ..P WKT 2011 04 28 23 34 55 31.3200 -97.3300 251.000 122.0 138.225 4.680 -999.990 -999.990 1.382 ..P WKT 2011 04 28 23 39 55 31.3200 -97.3300 251.000 457.0 140.658 5.400 -999.990 -999.990 1.407 ..P WKT 2011 04 28 23 44 55 31.3200 -97.3300 251.000 30.0 149.423 4.530 -999.990 -999.990 1.494 ..P WKT 2011 04 28 23 49 55 31.3200 -97.3300 251.000 122.0 138.359 5.770 -999.990 -999.990 1.384 ..P WKT 2011 04 29 00 09 55 31.3200 -97.3300 251.000 457.0 143.408 4.200 -999.990 -999.990 1.434 ..P WKT 2011 04 29 00 10 25 31.3200 -97.3300 251.000 457.0 143.698 4.240 -999.990 -999.990 1.437 ..P WKT 2011 04 29 00 10 55 31.3200 -97.3300 251.000 457.0 143.320 4.160 -999.990 -999.990 1.433 ..P WKT 2011 04 29 00 11 25 31.3200 -97.3300 251.000 457.0 139.276 5.310 -999.990 -999.990 1.393 ..P WKT 2011 04 29 00 11 55 31.3200 -97.3300 251.000 457.0 137.065 4.770 -999.990 -999.990 1.371 ..P WKT 2011 04 29 00 12 25 31.3200 -97.3300 251.000 457.0 143.022 4.190 -999.990 -999.990 1.430 ..P WKT 2011 04 29 00 12 55 31.3200 -97.3300 251.000 457.0 144.478 4.510 -999.990 -999.990 1.445 ..P WKT 2011 04 29 00 13 25 31.3200 -97.3300 251.000 457.0 140.600 4.220 -999.990 -999.990 1.406 ..P WKT 2011 04 29 00 13 55 31.3200 -97.3300 251.000 457.0 140.556 4.910 -999.990 -999.990 1.406 ..P WKT 2011 04 29 00 14 25 31.3200 -97.3300 251.000 457.0 139.512 4.590 -999.990 -999.990 1.395 ..P WKT 2011 04 29 00 14 55 31.3200 -97.3300 251.000 457.0 141.968 4.190 -999.990 -999.990 1.420 ..P WKT 2011 04 29 00 19 55 31.3200 -97.3300 251.000 30.0 143.196 4.240 -999.990 -999.990 1.432 ..P WKT 2011 04 29 00 24 55 31.3200 -97.3300 251.000 122.0 147.090 6.180 -999.990 -999.990 1.471 ..P WKT 2011 04 29 00 29 55 31.3200 -97.3300 251.000 457.0 137.817 4.680 -999.990 -999.990 1.378 ..P WKT 2011 04 29 00 34 55 31.3200 -97.3300 251.000 30.0 145.712 4.830 -999.990 -999.990 1.457 ..P WKT 2011 04 29 00 39 55 31.3200 -97.3300 251.000 122.0 143.272 5.080 -999.990 -999.990 1.433 ..P WKT 2011 04 29 00 44 55 31.3200 -97.3300 251.000 457.0 138.166 4.990 -999.990 -999.990 1.382 ..P WKT 2011 04 29 00 54 55 31.3200 -97.3300 251.000 30.0 168.302 5.820 -999.990 -999.990 1.683 ..P WKT 2011 04 29 00 59 55 31.3200 -97.3300 251.000 122.0 138.702 4.630 -999.990 -999.990 1.387 ..P WKT 2011 04 29 01 04 55 31.3200 -97.3300 251.000 457.0 136.773 4.450 -999.990 -999.990 1.368 ..P WKT 2011 04 29 01 09 55 31.3200 -97.3300 251.000 30.0 141.512 3.870 -999.990 -999.990 1.415 ..P WKT 2011 04 29 01 14 55 31.3200 -97.3300 251.000 122.0 138.083 4.900 -999.990 -999.990 1.381 ..P WKT 2011 04 29 01 19 55 31.3200 -97.3300 251.000 457.0 135.654 3.730 -999.990 -999.990 1.357 ..P WKT 2011 04 29 01 29 55 31.3200 -97.3300 251.000 30.0 136.868 3.700 -999.990 -999.990 1.369 ..P WKT 2011 04 29 01 34 55 31.3200 -97.3300 251.000 122.0 137.177 3.930 -999.990 -999.990 1.372 ..P WKT 2011 04 29 01 39 55 31.3200 -97.3300 251.000 457.0 135.487 5.190 -999.990 -999.990 1.355 ..P WKT 2011 04 29 01 44 55 31.3200 -97.3300 251.000 30.0 140.797 3.800 -999.990 -999.990 1.408 ..P WKT 2011 04 29 01 49 55 31.3200 -97.3300 251.000 122.0 140.773 6.120 -999.990 -999.990 1.408 ..P WKT 2011 04 29 01 54 55 31.3200 -97.3300 251.000 457.0 136.415 3.720 -999.990 -999.990 1.364 ..P WKT 2011 04 29 02 04 55 31.3200 -97.3300 251.000 30.0 138.510 5.150 -999.990 -999.990 1.385 ..P WKT 2011 04 29 02 09 55 31.3200 -97.3300 251.000 122.0 146.964 4.360 -999.990 -999.990 1.470 ..P WKT 2011 04 29 02 14 55 31.3200 -97.3300 251.000 457.0 143.415 5.220 -999.990 -999.990 1.434 ..P WKT 2011 04 29 02 19 55 31.3200 -97.3300 251.000 30.0 143.535 6.260 -999.990 -999.990 1.435 ..P WKT 2011 04 29 02 24 55 31.3200 -97.3300 251.000 122.0 150.655 5.710 -999.990 -999.990 1.507 ..P WKT 2011 04 29 02 29 55 31.3200 -97.3300 251.000 457.0 145.107 5.260 -999.990 -999.990 1.451 ..P WKT 2011 04 29 02 39 55 31.3200 -97.3300 251.000 30.0 149.393 5.530 -999.990 -999.990 1.494 ..P WKT 2011 04 29 02 44 55 31.3200 -97.3300 251.000 122.0 141.224 5.420 -999.990 -999.990 1.412 ..P WKT 2011 04 29 02 49 55 31.3200 -97.3300 251.000 457.0 137.723 5.570 -999.990 -999.990 1.377 ..P WKT 2011 04 29 02 54 55 31.3200 -97.3300 251.000 30.0 140.890 6.040 -999.990 -999.990 1.409 ..P WKT 2011 04 29 02 59 55 31.3200 -97.3300 251.000 122.0 138.389 5.420 -999.990 -999.990 1.384 ..P WKT 2011 04 29 03 04 55 31.3200 -97.3300 251.000 457.0 131.220 4.280 -999.990 -999.990 1.312 ..P WKT 2011 04 29 03 14 55 31.3200 -97.3300 251.000 30.0 137.246 5.670 -999.990 -999.990 1.372 ..P WKT 2011 04 29 03 19 55 31.3200 -97.3300 251.000 122.0 137.936 5.430 -999.990 -999.990 1.379 ..P WKT 2011 04 29 03 24 55 31.3200 -97.3300 251.000 457.0 134.793 6.100 -999.990 -999.990 1.348 ..P WKT 2011 04 29 03 29 55 31.3200 -97.3300 251.000 30.0 139.651 4.970 -999.990 -999.990 1.397 ..P WKT 2011 04 29 03 34 55 31.3200 -97.3300 251.000 122.0 140.175 4.030 -999.990 -999.990 1.402 ..P WKT 2011 04 29 03 39 55 31.3200 -97.3300 251.000 457.0 142.533 3.660 -999.990 -999.990 1.425 ..P WKT 2011 04 29 03 49 55 31.3200 -97.3300 251.000 30.0 143.556 3.500 -999.990 -999.990 1.436 ..P WKT 2011 04 29 03 54 55 31.3200 -97.3300 251.000 122.0 141.389 4.560 -999.990 -999.990 1.414 ..P WKT 2011 04 29 03 59 55 31.3200 -97.3300 251.000 457.0 132.553 3.750 -999.990 -999.990 1.326 ..P WKT 2011 04 29 04 04 55 31.3200 -97.3300 251.000 30.0 146.723 3.080 -999.990 -999.990 1.467 ..P WKT 2011 04 29 04 09 55 31.3200 -97.3300 251.000 122.0 155.558 4.640 -999.990 -999.990 1.556 ..P WKT 2011 04 29 04 14 55 31.3200 -97.3300 251.000 457.0 146.055 3.190 -999.990 -999.990 1.461 ..P WKT 2011 04 29 04 24 55 31.3200 -97.3300 251.000 30.0 146.675 3.510 -999.990 -999.990 1.467 ..P WKT 2011 04 29 04 29 55 31.3200 -97.3300 251.000 122.0 148.461 3.100 -999.990 -999.990 1.485 ..P WKT 2011 04 29 04 34 55 31.3200 -97.3300 251.000 457.0 148.913 4.300 -999.990 -999.990 1.489 ..P WKT 2011 04 29 04 39 55 31.3200 -97.3300 251.000 30.0 142.197 3.880 -999.990 -999.990 1.422 ..P WKT 2011 04 29 04 44 55 31.3200 -97.3300 251.000 122.0 144.817 3.760 -999.990 -999.990 1.448 ..P WKT 2011 04 29 04 49 55 31.3200 -97.3300 251.000 457.0 144.935 4.100 -999.990 -999.990 1.449 ..P WKT 2011 04 29 05 04 55 31.3200 -97.3300 251.000 30.0 145.643 5.030 -999.990 -999.990 1.456 ..P WKT 2011 04 29 05 09 55 31.3200 -97.3300 251.000 122.0 146.438 4.680 -999.990 -999.990 1.464 ..P WKT 2011 04 29 05 14 55 31.3200 -97.3300 251.000 457.0 139.565 5.530 -999.990 -999.990 1.396 ..P WKT 2011 04 29 05 19 55 31.3200 -97.3300 251.000 30.0 147.194 3.720 -999.990 -999.990 1.472 ..P WKT 2011 04 29 05 24 55 31.3200 -97.3300 251.000 122.0 145.821 4.050 -999.990 -999.990 1.458 ..P WKT 2011 04 29 05 29 55 31.3200 -97.3300 251.000 457.0 140.115 3.830 -999.990 -999.990 1.401 ..P WKT 2011 04 29 05 39 55 31.3200 -97.3300 251.000 30.0 150.816 3.810 -999.990 -999.990 1.508 ..P WKT 2011 04 29 05 44 55 31.3200 -97.3300 251.000 122.0 143.886 3.640 -999.990 -999.990 1.439 ..P WKT 2011 04 29 05 49 55 31.3200 -97.3300 251.000 457.0 142.624 3.660 -999.990 -999.990 1.426 ..P WKT 2011 04 29 05 54 55 31.3200 -97.3300 251.000 30.0 140.695 3.640 -999.990 -999.990 1.407 ..P WKT 2011 04 29 05 59 55 31.3200 -97.3300 251.000 122.0 143.767 3.340 -999.990 -999.990 1.438 ..P WKT 2011 04 29 06 04 55 31.3200 -97.3300 251.000 457.0 138.837 3.290 -999.990 -999.990 1.388 ..P WKT 2011 04 29 06 14 55 31.3200 -97.3300 251.000 30.0 141.123 2.970 -999.990 -999.990 1.411 ..P WKT 2011 04 29 06 19 55 31.3200 -97.3300 251.000 122.0 147.672 2.970 -999.990 -999.990 1.477 ..P WKT 2011 04 29 06 24 55 31.3200 -97.3300 251.000 457.0 146.553 3.180 -999.990 -999.990 1.466 ..P WKT 2011 04 29 06 29 55 31.3200 -97.3300 251.000 30.0 150.434 3.870 -999.990 -999.990 1.504 ..P WKT 2011 04 29 06 34 55 31.3200 -97.3300 251.000 122.0 147.648 3.260 -999.990 -999.990 1.476 ..P WKT 2011 04 29 06 39 55 31.3200 -97.3300 251.000 457.0 144.528 3.090 -999.990 -999.990 1.445 ..P WKT 2011 04 29 06 49 55 31.3200 -97.3300 251.000 30.0 156.983 3.060 -999.990 -999.990 1.570 ..P WKT 2011 04 29 06 54 55 31.3200 -97.3300 251.000 122.0 144.552 5.830 -999.990 -999.990 1.446 ..P WKT 2011 04 29 06 59 55 31.3200 -97.3300 251.000 457.0 148.790 3.810 -999.990 -999.990 1.488 ..P WKT 2011 04 29 07 04 55 31.3200 -97.3300 251.000 30.0 151.362 4.210 -999.990 -999.990 1.514 ..P WKT 2011 04 29 07 09 55 31.3200 -97.3300 251.000 122.0 139.598 4.450 -999.990 -999.990 1.396 ..P WKT 2011 04 29 07 14 55 31.3200 -97.3300 251.000 457.0 145.004 5.810 -999.990 -999.990 1.450 ..P WKT 2011 04 29 07 24 55 31.3200 -97.3300 251.000 30.0 151.456 5.420 -999.990 -999.990 1.515 ..P WKT 2011 04 29 07 29 55 31.3200 -97.3300 251.000 122.0 149.337 4.600 -999.990 -999.990 1.493 ..P WKT 2011 04 29 07 34 55 31.3200 -97.3300 251.000 457.0 144.384 5.420 -999.990 -999.990 1.444 ..P WKT 2011 04 29 07 39 55 31.3200 -97.3300 251.000 30.0 148.098 7.950 -999.990 -999.990 1.481 ..P WKT 2011 04 29 07 44 55 31.3200 -97.3300 251.000 122.0 150.980 3.560 -999.990 -999.990 1.510 ..P WKT 2011 04 29 07 49 55 31.3200 -97.3300 251.000 457.0 154.195 4.710 -999.990 -999.990 1.542 ..P WKT 2011 04 29 07 59 55 31.3200 -97.3300 251.000 30.0 144.431 3.610 -999.990 -999.990 1.444 ..P WKT 2011 04 29 08 04 55 31.3200 -97.3300 251.000 122.0 154.623 3.130 -999.990 -999.990 1.546 ..P WKT 2011 04 29 08 09 55 31.3200 -97.3300 251.000 457.0 160.481 5.870 -999.990 -999.990 1.605 ..P WKT 2011 04 29 08 14 55 31.3200 -97.3300 251.000 30.0 153.336 3.170 -999.990 -999.990 1.533 ..P WKT 2011 04 29 08 19 55 31.3200 -97.3300 251.000 122.0 165.196 3.290 -999.990 -999.990 1.652 ..P WKT 2011 04 29 08 24 55 31.3200 -97.3300 251.000 457.0 158.218 3.740 -999.990 -999.990 1.582 ..P WKT 2011 04 29 08 34 55 31.3200 -97.3300 251.000 30.0 153.384 4.190 -999.990 -999.990 1.534 ..P WKT 2011 04 29 08 39 55 31.3200 -97.3300 251.000 122.0 165.361 3.200 -999.990 -999.990 1.654 ..P WKT 2011 04 29 08 44 55 31.3200 -97.3300 251.000 457.0 155.835 3.080 -999.990 -999.990 1.558 ..P WKT 2011 04 29 08 49 55 31.3200 -97.3300 251.000 30.0 152.145 3.270 -999.990 -999.990 1.521 ..P WKT 2011 04 29 08 54 55 31.3200 -97.3300 251.000 122.0 159.121 2.870 -999.990 -999.990 1.591 ..P WKT 2011 04 29 08 59 55 31.3200 -97.3300 251.000 457.0 151.430 2.900 -999.990 -999.990 1.514 ..P WKT 2011 04 29 09 09 55 31.3200 -97.3300 251.000 30.0 157.621 2.850 -999.990 -999.990 1.576 ..P WKT 2011 04 29 09 14 55 31.3200 -97.3300 251.000 122.0 160.336 3.100 -999.990 -999.990 1.603 ..P WKT 2011 04 29 09 19 55 31.3200 -97.3300 251.000 457.0 168.717 2.860 -999.990 -999.990 1.687 ..P WKT 2011 04 29 09 24 55 31.3200 -97.3300 251.000 30.0 161.431 2.590 -999.990 -999.990 1.614 ..P WKT 2011 04 29 09 29 55 31.3200 -97.3300 251.000 122.0 169.812 2.700 -999.990 -999.990 1.698 ..P WKT 2011 04 29 09 34 55 31.3200 -97.3300 251.000 457.0 154.191 4.270 -999.990 -999.990 1.542 ..P WKT 2011 04 29 09 44 55 31.3200 -97.3300 251.000 30.0 159.692 3.770 -999.990 -999.990 1.597 ..P WKT 2011 04 29 09 49 55 31.3200 -97.3300 251.000 122.0 160.143 2.710 -999.990 -999.990 1.601 ..P WKT 2011 04 29 09 54 55 31.3200 -97.3300 251.000 457.0 143.928 3.860 -999.990 -999.990 1.439 ..P WKT 2011 04 29 09 59 55 31.3200 -97.3300 251.000 30.0 157.714 5.900 -999.990 -999.990 1.577 ..P WKT 2011 04 29 10 04 55 31.3200 -97.3300 251.000 122.0 156.499 4.430 -999.990 -999.990 1.565 ..P WKT 2011 04 29 10 09 55 31.3200 -97.3300 251.000 457.0 152.951 3.270 -999.990 -999.990 1.530 ..P WKT 2011 04 29 10 19 55 31.3200 -97.3300 251.000 30.0 157.142 3.280 -999.990 -999.990 1.571 ..P WKT 2011 04 29 10 24 55 31.3200 -97.3300 251.000 122.0 162.546 4.240 -999.990 -999.990 1.625 ..P WKT 2011 04 29 10 29 55 31.3200 -97.3300 251.000 457.0 154.618 4.960 -999.990 -999.990 1.546 ..P WKT 2011 04 29 10 34 55 31.3200 -97.3300 251.000 30.0 163.356 5.520 -999.990 -999.990 1.634 ..P WKT 2011 04 29 10 39 55 31.3200 -97.3300 251.000 122.0 168.094 6.510 -999.990 -999.990 1.681 ..P WKT 2011 04 29 10 44 55 31.3200 -97.3300 251.000 457.0 176.498 3.320 -999.990 -999.990 1.765 ..P WKT 2011 04 29 10 54 55 31.3200 -97.3300 251.000 30.0 167.427 3.060 -999.990 -999.990 1.674 ..P WKT 2011 04 29 10 59 55 31.3200 -97.3300 251.000 122.0 163.950 5.180 -999.990 -999.990 1.639 ..P WKT 2011 04 29 11 04 55 31.3200 -97.3300 251.000 457.0 163.807 5.290 -999.990 -999.990 1.638 ..P WKT 2011 04 29 11 09 55 31.3200 -97.3300 251.000 30.0 166.498 5.120 -999.990 -999.990 1.665 ..P WKT 2011 04 29 11 14 55 31.3200 -97.3300 251.000 122.0 161.521 2.770 -999.990 -999.990 1.615 ..P WKT 2011 04 29 11 19 55 31.3200 -97.3300 251.000 457.0 171.378 2.700 -999.990 -999.990 1.714 ..P WKT 2011 04 29 11 29 55 31.3200 -97.3300 251.000 30.0 163.196 2.310 -999.990 -999.990 1.632 ..P WKT 2011 04 29 11 34 55 31.3200 -97.3300 251.000 122.0 159.157 2.560 -999.990 -999.990 1.592 ..P WKT 2011 04 29 11 39 55 31.3200 -97.3300 251.000 457.0 193.284 4.060 -999.990 -999.990 1.933 ..P WKT 2011 04 29 11 44 55 31.3200 -97.3300 251.000 30.0 173.079 2.670 -999.990 -999.990 1.731 ..P WKT 2011 04 29 11 49 55 31.3200 -97.3300 251.000 122.0 164.040 3.320 -999.990 -999.990 1.640 ..P WKT 2011 04 29 12 09 55 31.3200 -97.3300 251.000 457.0 178.225 5.290 -999.990 -999.990 1.782 ..P WKT 2011 04 29 12 10 25 31.3200 -97.3300 251.000 457.0 168.096 3.270 -999.990 -999.990 1.681 ..P WKT 2011 04 29 12 10 55 31.3200 -97.3300 251.000 457.0 172.133 2.920 -999.990 -999.990 1.721 ..P WKT 2011 04 29 12 11 25 31.3200 -97.3300 251.000 457.0 177.670 3.720 -999.990 -999.990 1.777 ..P WKT 2011 04 29 12 11 55 31.3200 -97.3300 251.000 457.0 174.040 2.940 -999.990 -999.990 1.740 ..P WKT 2011 04 29 12 12 25 31.3200 -97.3300 251.000 457.0 174.411 2.000 -999.990 -999.990 1.744 ..P WKT 2011 04 29 12 12 55 31.3200 -97.3300 251.000 457.0 183.947 6.050 -999.990 -999.990 1.839 ..P WKT 2011 04 29 12 13 25 31.3200 -97.3300 251.000 457.0 193.483 2.410 -999.990 -999.990 1.935 ..P WKT 2011 04 29 12 13 55 31.3200 -97.3300 251.000 457.0 190.354 3.800 -999.990 -999.990 1.904 ..P WKT 2011 04 29 12 14 25 31.3200 -97.3300 251.000 457.0 185.891 4.480 -999.990 -999.990 1.859 ..P WKT 2011 04 29 12 14 55 31.3200 -97.3300 251.000 457.0 187.095 3.410 -999.990 -999.990 1.871 ..P WKT 2011 04 29 12 19 55 31.3200 -97.3300 251.000 30.0 168.635 2.220 -999.990 -999.990 1.686 ..P WKT 2011 04 29 12 24 55 31.3200 -97.3300 251.000 122.0 165.007 4.740 -999.990 -999.990 1.650 ..P WKT 2011 04 29 12 29 55 31.3200 -97.3300 251.000 457.0 155.049 4.490 -999.990 -999.990 1.550 ..P WKT 2011 04 29 12 34 55 31.3200 -97.3300 251.000 30.0 174.582 2.740 -999.990 -999.990 1.746 ..P WKT 2011 04 29 12 39 55 31.3200 -97.3300 251.000 122.0 170.955 3.180 -999.990 -999.990 1.710 ..P WKT 2011 04 29 12 44 55 31.3200 -97.3300 251.000 457.0 165.994 3.290 -999.990 -999.990 1.660 ..P WKT 2011 04 29 12 54 55 31.3200 -97.3300 251.000 30.0 176.344 3.750 -999.990 -999.990 1.763 ..P WKT 2011 04 29 12 59 55 31.3200 -97.3300 251.000 122.0 171.995 3.570 -999.990 -999.990 1.720 ..P WKT 2011 04 29 13 04 55 31.3200 -97.3300 251.000 457.0 167.980 4.740 -999.990 -999.990 1.680 ..P WKT 2011 04 29 13 09 55 31.3200 -97.3300 251.000 30.0 175.126 3.760 -999.990 -999.990 1.751 ..P WKT 2011 04 29 13 14 55 31.3200 -97.3300 251.000 122.0 180.605 4.100 -999.990 -999.990 1.806 ..P WKT 2011 04 29 13 19 55 31.3200 -97.3300 251.000 457.0 160.767 3.650 -999.990 -999.990 1.608 ..P WKT 2011 04 29 13 29 55 31.3200 -97.3300 251.000 30.0 173.889 4.400 -999.990 -999.990 1.739 ..P WKT 2011 04 29 13 34 55 31.3200 -97.3300 251.000 122.0 172.873 3.640 -999.990 -999.990 1.729 ..P WKT 2011 04 29 13 39 55 31.3200 -97.3300 251.000 457.0 157.536 3.780 -999.990 -999.990 1.575 ..P WKT 2011 04 29 13 44 55 31.3200 -97.3300 251.000 30.0 170.173 5.600 -999.990 -999.990 1.702 ..P WKT 2011 04 29 13 49 55 31.3200 -97.3300 251.000 122.0 167.825 3.330 -999.990 -999.990 1.678 ..P WKT 2011 04 29 13 54 55 31.3200 -97.3300 251.000 457.0 150.159 4.020 -999.990 -999.990 1.502 ..P WKT 2011 04 29 14 04 55 31.3200 -97.3300 251.000 30.0 167.821 3.040 -999.990 -999.990 1.678 ..P WKT 2011 04 29 14 09 55 31.3200 -97.3300 251.000 122.0 169.183 4.030 -999.990 -999.990 1.692 ..P WKT 2011 04 29 14 14 55 31.3200 -97.3300 251.000 457.0 151.900 3.100 -999.990 -999.990 1.519 ..P WKT 2011 04 29 14 19 55 31.3200 -97.3300 251.000 30.0 168.245 4.230 -999.990 -999.990 1.682 ..P WKT 2011 04 29 14 24 55 31.3200 -97.3300 251.000 122.0 175.267 3.670 -999.990 -999.990 1.753 ..P WKT 2011 04 29 14 29 55 31.3200 -97.3300 251.000 457.0 152.326 2.720 -999.990 -999.990 1.523 ..P WKT 2011 04 29 14 39 55 31.3200 -97.3300 251.000 30.0 169.389 2.430 -999.990 -999.990 1.694 ..P WKT 2011 04 29 14 44 55 31.3200 -97.3300 251.000 122.0 172.439 3.410 -999.990 -999.990 1.724 ..P WKT 2011 04 29 14 49 55 31.3200 -97.3300 251.000 457.0 150.858 3.630 -999.990 -999.990 1.509 ..P WKT 2011 04 29 14 54 55 31.3200 -97.3300 251.000 30.0 162.894 4.660 -999.990 -999.990 1.629 ..P WKT 2011 04 29 14 59 55 31.3200 -97.3300 251.000 122.0 162.283 4.720 -999.990 -999.990 1.623 ..P WKT 2011 04 29 15 04 55 31.3200 -97.3300 251.000 457.0 157.345 4.190 -999.990 -999.990 1.573 ..P WKT 2011 04 29 15 14 55 31.3200 -97.3300 251.000 30.0 159.808 4.260 -999.990 -999.990 1.598 ..P WKT 2011 04 29 15 19 55 31.3200 -97.3300 251.000 122.0 158.555 5.740 -999.990 -999.990 1.586 ..P WKT 2011 04 29 15 24 55 31.3200 -97.3300 251.000 457.0 157.136 4.230 -999.990 -999.990 1.571 ..P WKT 2011 04 29 15 29 55 31.3200 -97.3300 251.000 30.0 155.218 4.810 -999.990 -999.990 1.552 ..P WKT 2011 04 29 15 34 55 31.3200 -97.3300 251.000 122.0 165.445 3.870 -999.990 -999.990 1.654 ..P WKT 2011 04 29 15 39 55 31.3200 -97.3300 251.000 457.0 160.532 5.290 -999.990 -999.990 1.605 ..P WKT 2011 04 29 15 49 55 31.3200 -97.3300 251.000 30.0 165.037 5.430 -999.990 -999.990 1.650 ..P WKT 2011 04 29 15 54 55 31.3200 -97.3300 251.000 122.0 163.642 5.260 -999.990 -999.990 1.636 ..P WKT 2011 04 29 15 59 55 31.3200 -97.3300 251.000 457.0 153.265 4.180 -999.990 -999.990 1.533 ..P WKT 2011 04 29 16 04 55 31.3200 -97.3300 251.000 30.0 163.346 3.760 -999.990 -999.990 1.633 ..P WKT 2011 04 29 16 09 55 31.3200 -97.3300 251.000 122.0 162.450 4.000 -999.990 -999.990 1.624 ..P WKT 2011 04 29 16 14 55 31.3200 -97.3300 251.000 457.0 155.567 3.520 -999.990 -999.990 1.556 ..P WKT 2011 04 29 16 24 55 31.3200 -97.3300 251.000 30.0 152.517 2.670 -999.990 -999.990 1.525 ..P WKT 2011 04 29 16 29 55 31.3200 -97.3300 251.000 122.0 153.855 3.590 -999.990 -999.990 1.539 ..P WKT 2011 04 29 16 34 55 31.3200 -97.3300 251.000 457.0 143.719 4.360 -999.990 -999.990 1.437 ..P WKT 2011 04 29 16 39 55 31.3200 -97.3300 251.000 30.0 155.697 3.960 -999.990 -999.990 1.557 ..P WKT 2011 04 29 16 44 55 31.3200 -97.3300 251.000 122.0 160.859 2.960 -999.990 -999.990 1.609 ..P WKT 2011 04 29 16 49 55 31.3200 -97.3300 251.000 457.0 160.533 2.700 -999.990 -999.990 1.605 ..P WKT 2011 04 29 17 04 55 31.3200 -97.3300 251.000 30.0 169.939 4.550 -999.990 -999.990 1.699 ..P WKT 2011 04 29 17 09 55 31.3200 -97.3300 251.000 122.0 175.552 3.440 -999.990 -999.990 1.756 ..P WKT 2011 04 29 17 14 55 31.3200 -97.3300 251.000 457.0 168.201 3.460 -999.990 -999.990 1.682 ..P WKT 2011 04 29 17 19 55 31.3200 -97.3300 251.000 30.0 172.484 2.830 -999.990 -999.990 1.725 ..P WKT 2011 04 29 17 24 55 31.3200 -97.3300 251.000 122.0 155.162 2.200 -999.990 -999.990 1.552 ..P WKT 2011 04 29 17 29 55 31.3200 -97.3300 251.000 457.0 155.125 2.000 -999.990 -999.990 1.551 ..P WKT 2011 04 29 17 39 55 31.3200 -97.3300 251.000 30.0 156.020 2.430 -999.990 -999.990 1.560 ..P WKT 2011 04 29 17 44 55 31.3200 -97.3300 251.000 122.0 153.962 2.470 -999.990 -999.990 1.540 ..P WKT 2011 04 29 17 49 55 31.3200 -97.3300 251.000 457.0 146.587 3.820 -999.990 -999.990 1.466 ..P WKT 2011 04 29 17 54 55 31.3200 -97.3300 251.000 30.0 152.505 3.950 -999.990 -999.990 1.525 ..P WKT 2011 04 29 17 59 55 31.3200 -97.3300 251.000 122.0 153.770 2.920 -999.990 -999.990 1.538 ..P WKT 2011 04 29 18 04 55 31.3200 -97.3300 251.000 457.0 148.721 3.370 -999.990 -999.990 1.487 ..P WKT 2011 04 29 18 14 55 31.3200 -97.3300 251.000 30.0 154.716 2.610 -999.990 -999.990 1.547 ..P WKT 2011 04 29 18 19 55 31.3200 -97.3300 251.000 122.0 150.475 4.260 -999.990 -999.990 1.505 ..P WKT 2011 04 29 18 24 55 31.3200 -97.3300 251.000 457.0 150.886 2.640 -999.990 -999.990 1.509 ..P WKT 2011 04 29 18 29 55 31.3200 -97.3300 251.000 30.0 148.639 2.180 -999.990 -999.990 1.486 ..P WKT 2011 04 29 18 34 55 31.3200 -97.3300 251.000 122.0 146.393 2.390 -999.990 -999.990 1.464 ..P WKT 2011 04 29 18 39 55 31.3200 -97.3300 251.000 457.0 144.478 3.080 -999.990 -999.990 1.445 ..P WKT 2011 04 29 18 49 55 31.3200 -97.3300 251.000 30.0 141.361 1.870 -999.990 -999.990 1.414 ..P WKT 2011 04 29 18 54 55 31.3200 -97.3300 251.000 122.0 146.138 2.100 -999.990 -999.990 1.461 ..P WKT 2011 04 29 18 59 55 31.3200 -97.3300 251.000 457.0 145.599 2.650 -999.990 -999.990 1.456 ..P WKT 2011 04 29 19 04 55 31.3200 -97.3300 251.000 30.0 145.560 2.970 -999.990 -999.990 1.456 ..P WKT 2011 04 29 19 09 55 31.3200 -97.3300 251.000 122.0 150.169 4.940 -999.990 -999.990 1.502 ..P WKT 2011 04 29 19 14 55 31.3200 -97.3300 251.000 457.0 153.782 3.350 -999.990 -999.990 1.538 ..P WKT 2011 04 29 19 24 55 31.3200 -97.3300 251.000 30.0 149.550 3.110 -999.990 -999.990 1.496 ..P WKT 2011 04 29 19 29 55 31.3200 -97.3300 251.000 122.0 152.498 2.590 -999.990 -999.990 1.525 ..P WKT 2011 04 29 19 34 55 31.3200 -97.3300 251.000 457.0 146.980 2.490 -999.990 -999.990 1.470 ..P WKT 2011 04 29 19 39 55 31.3200 -97.3300 251.000 30.0 145.779 4.190 -999.990 -999.990 1.458 ..P WKT 2011 04 29 19 44 55 31.3200 -97.3300 251.000 122.0 152.046 3.210 -999.990 -999.990 1.520 ..P WKT 2011 04 29 19 49 55 31.3200 -97.3300 251.000 457.0 144.869 2.190 -999.990 -999.990 1.449 ..P WKT 2011 04 29 19 59 55 31.3200 -97.3300 251.000 30.0 148.488 3.360 -999.990 -999.990 1.485 ..P WKT 2011 04 29 20 04 55 31.3200 -97.3300 251.000 122.0 148.827 2.670 -999.990 -999.990 1.488 ..P WKT 2011 04 29 20 09 55 31.3200 -97.3300 251.000 457.0 147.838 2.770 -999.990 -999.990 1.478 ..P WKT 2011 04 29 20 14 55 31.3200 -97.3300 251.000 30.0 156.309 2.540 -999.990 -999.990 1.563 ..P WKT 2011 04 29 20 19 55 31.3200 -97.3300 251.000 122.0 152.831 3.490 -999.990 -999.990 1.528 ..P WKT 2011 04 29 20 24 55 31.3200 -97.3300 251.000 457.0 150.516 2.250 -999.990 -999.990 1.505 ..P WKT 2011 04 29 20 34 55 31.3200 -97.3300 251.000 30.0 154.844 2.890 -999.990 -999.990 1.548 ..P WKT 2011 04 29 20 39 55 31.3200 -97.3300 251.000 122.0 147.053 2.040 -999.990 -999.990 1.471 ..P WKT 2011 04 29 20 44 55 31.3200 -97.3300 251.000 457.0 145.402 3.700 -999.990 -999.990 1.454 ..P WKT 2011 04 29 20 49 55 31.3200 -97.3300 251.000 30.0 152.377 3.450 -999.990 -999.990 1.524 ..P WKT 2011 04 29 20 54 55 31.3200 -97.3300 251.000 122.0 157.195 2.760 -999.990 -999.990 1.572 ..P WKT 2011 04 29 20 59 55 31.3200 -97.3300 251.000 457.0 149.572 2.280 -999.990 -999.990 1.496 ..P WKT 2011 04 29 21 09 55 31.3200 -97.3300 251.000 30.0 158.732 2.920 -999.990 -999.990 1.587 ..P WKT 2011 04 29 21 14 55 31.3200 -97.3300 251.000 122.0 157.104 3.070 -999.990 -999.990 1.571 ..P WKT 2011 04 29 21 19 55 31.3200 -97.3300 251.000 457.0 158.794 3.740 -999.990 -999.990 1.588 ..P WKT 2011 04 29 21 24 55 31.3200 -97.3300 251.000 30.0 158.493 3.960 -999.990 -999.990 1.585 ..P WKT 2011 04 29 21 29 55 31.3200 -97.3300 251.000 122.0 155.870 2.830 -999.990 -999.990 1.559 ..P WKT 2011 04 29 21 34 55 31.3200 -97.3300 251.000 457.0 154.574 3.040 -999.990 -999.990 1.546 ..P WKT 2011 04 29 21 44 55 31.3200 -97.3300 251.000 30.0 149.851 3.140 -999.990 -999.990 1.499 ..P WKT 2011 04 29 21 49 55 31.3200 -97.3300 251.000 122.0 150.403 4.670 -999.990 -999.990 1.504 ..P WKT 2011 04 29 21 54 55 31.3200 -97.3300 251.000 457.0 148.633 3.030 -999.990 -999.990 1.486 ..P WKT 2011 04 29 21 59 55 31.3200 -97.3300 251.000 30.0 153.165 3.160 -999.990 -999.990 1.532 ..P WKT 2011 04 29 22 04 55 31.3200 -97.3300 251.000 122.0 153.716 3.040 -999.990 -999.990 1.537 ..P WKT 2011 04 29 22 09 55 31.3200 -97.3300 251.000 457.0 149.958 2.570 -999.990 -999.990 1.500 ..P WKT 2011 04 29 22 19 55 31.3200 -97.3300 251.000 30.0 150.683 3.200 -999.990 -999.990 1.507 ..P WKT 2011 04 29 22 24 55 31.3200 -97.3300 251.000 122.0 156.491 3.370 -999.990 -999.990 1.565 ..P WKT 2011 04 29 22 29 55 31.3200 -97.3300 251.000 457.0 152.355 2.590 -999.990 -999.990 1.524 ..P WKT 2011 04 29 22 34 55 31.3200 -97.3300 251.000 30.0 144.241 2.520 -999.990 -999.990 1.442 ..P WKT 2011 04 29 22 39 55 31.3200 -97.3300 251.000 122.0 145.740 3.790 -999.990 -999.990 1.457 ..P WKT 2011 04 29 22 44 55 31.3200 -97.3300 251.000 457.0 147.903 2.620 -999.990 -999.990 1.479 ..P WKT 2011 04 29 22 54 55 31.3200 -97.3300 251.000 30.0 143.633 3.810 -999.990 -999.990 1.436 ..P WKT 2011 04 29 22 59 55 31.3200 -97.3300 251.000 122.0 147.144 3.210 -999.990 -999.990 1.471 ..P WKT 2011 04 29 23 04 55 31.3200 -97.3300 251.000 457.0 144.855 4.380 -999.990 -999.990 1.449 ..P WKT 2011 04 29 23 09 55 31.3200 -97.3300 251.000 30.0 150.022 2.900 -999.990 -999.990 1.500 ..P WKT 2011 04 29 23 14 55 31.3200 -97.3300 251.000 122.0 147.899 2.660 -999.990 -999.990 1.479 ..P WKT 2011 04 29 23 19 55 31.3200 -97.3300 251.000 457.0 151.079 4.700 -999.990 -999.990 1.511 ..P WKT 2011 04 29 23 29 55 31.3200 -97.3300 251.000 30.0 139.207 3.610 -999.990 -999.990 1.392 ..P WKT 2011 04 29 23 34 55 31.3200 -97.3300 251.000 122.0 152.485 3.140 -999.990 -999.990 1.525 ..P WKT 2011 04 29 23 39 55 31.3200 -97.3300 251.000 457.0 142.074 3.510 -999.990 -999.990 1.421 ..P WKT 2011 04 29 23 44 55 31.3200 -97.3300 251.000 30.0 145.246 4.040 -999.990 -999.990 1.452 ..P WKT 2011 04 29 23 49 55 31.3200 -97.3300 251.000 122.0 145.106 3.880 -999.990 -999.990 1.451 ..P WKT 2011 04 30 00 09 55 31.3200 -97.3300 251.000 457.0 150.456 4.400 -999.990 -999.990 1.505 ..P WKT 2011 04 30 00 10 25 31.3200 -97.3300 251.000 457.0 147.488 4.140 -999.990 -999.990 1.475 ..P WKT 2011 04 30 00 10 55 31.3200 -97.3300 251.000 457.0 145.845 4.190 -999.990 -999.990 1.458 ..P WKT 2011 04 30 00 11 25 31.3200 -97.3300 251.000 457.0 145.028 4.750 -999.990 -999.990 1.450 ..P WKT 2011 04 30 00 11 55 31.3200 -97.3300 251.000 457.0 150.507 3.930 -999.990 -999.990 1.505 ..P WKT 2011 04 30 00 12 25 31.3200 -97.3300 251.000 457.0 153.500 4.050 -999.990 -999.990 1.535 ..P WKT 2011 04 30 00 12 55 31.3200 -97.3300 251.000 457.0 153.348 4.140 -999.990 -999.990 1.533 ..P WKT 2011 04 30 00 13 25 31.3200 -97.3300 251.000 457.0 150.544 4.240 -999.990 -999.990 1.505 ..P WKT 2011 04 30 00 13 55 31.3200 -97.3300 251.000 457.0 148.901 3.760 -999.990 -999.990 1.489 ..P WKT 2011 04 30 00 14 25 31.3200 -97.3300 251.000 457.0 149.410 4.110 -999.990 -999.990 1.494 ..P WKT 2011 04 30 00 14 55 31.3200 -97.3300 251.000 457.0 154.723 4.000 -999.990 -999.990 1.547 ..P WKT 2011 04 30 00 19 55 31.3200 -97.3300 251.000 30.0 154.682 4.110 -999.990 -999.990 1.547 ..P WKT 2011 04 30 00 24 55 31.3200 -97.3300 251.000 122.0 150.832 4.400 -999.990 -999.990 1.508 ..P WKT 2011 04 30 00 29 55 31.3200 -97.3300 251.000 457.0 142.842 4.600 -999.990 -999.990 1.428 ..P WKT 2011 04 30 00 34 55 31.3200 -97.3300 251.000 30.0 147.273 3.490 -999.990 -999.990 1.473 ..P WKT 2011 04 30 00 39 55 31.3200 -97.3300 251.000 122.0 143.920 3.680 -999.990 -999.990 1.439 ..P WKT 2011 04 30 00 44 55 31.3200 -97.3300 251.000 457.0 144.211 2.870 -999.990 -999.990 1.442 ..P WKT 2011 04 30 00 54 55 31.3200 -97.3300 251.000 30.0 143.219 2.820 -999.990 -999.990 1.432 ..P WKT 2011 04 30 00 59 55 31.3200 -97.3300 251.000 122.0 141.606 2.950 -999.990 -999.990 1.416 ..P WKT 2011 04 30 01 04 55 31.3200 -97.3300 251.000 457.0 149.934 3.180 -999.990 -999.990 1.499 ..P WKT 2011 04 30 01 09 55 31.3200 -97.3300 251.000 30.0 147.990 3.050 -999.990 -999.990 1.480 ..P WKT 2011 04 30 01 14 55 31.3200 -97.3300 251.000 122.0 155.987 2.740 -999.990 -999.990 1.560 ..P WKT 2011 04 30 01 19 55 31.3200 -97.3300 251.000 457.0 147.745 2.680 -999.990 -999.990 1.477 ..P WKT 2011 04 30 01 29 55 31.3200 -97.3300 251.000 30.0 151.478 3.200 -999.990 -999.990 1.515 ..P WKT 2011 04 30 01 34 55 31.3200 -97.3300 251.000 122.0 149.534 3.750 -999.990 -999.990 1.495 ..P WKT 2011 04 30 01 39 55 31.3200 -97.3300 251.000 457.0 146.925 2.800 -999.990 -999.990 1.469 ..P WKT 2011 04 30 01 44 55 31.3200 -97.3300 251.000 30.0 152.935 2.910 -999.990 -999.990 1.529 ..P WKT 2011 04 30 01 49 55 31.3200 -97.3300 251.000 122.0 153.643 2.750 -999.990 -999.990 1.536 ..P WKT 2011 04 30 01 54 55 31.3200 -97.3300 251.000 457.0 150.040 2.700 -999.990 -999.990 1.500 ..P WKT 2011 04 30 02 04 55 31.3200 -97.3300 251.000 30.0 152.685 2.800 -999.990 -999.990 1.527 ..P WKT 2011 04 30 02 09 55 31.3200 -97.3300 251.000 122.0 156.282 3.160 -999.990 -999.990 1.563 ..P WKT 2011 04 30 02 14 55 31.3200 -97.3300 251.000 457.0 157.888 3.770 -999.990 -999.990 1.579 ..P WKT 2011 04 30 02 19 55 31.3200 -97.3300 251.000 30.0 159.827 4.370 -999.990 -999.990 1.598 ..P WKT 2011 04 30 02 24 55 31.3200 -97.3300 251.000 122.0 159.114 3.370 -999.990 -999.990 1.591 ..P WKT 2011 04 30 02 29 55 31.3200 -97.3300 251.000 457.0 150.773 2.760 -999.990 -999.990 1.508 ..P WKT 2011 04 30 02 39 55 31.3200 -97.3300 251.000 30.0 157.659 2.880 -999.990 -999.990 1.577 ..P WKT 2011 04 30 02 44 55 31.3200 -97.3300 251.000 122.0 155.643 3.380 -999.990 -999.990 1.556 ..P WKT 2011 04 30 02 49 55 31.3200 -97.3300 251.000 457.0 153.791 3.900 -999.990 -999.990 1.538 ..P WKT 2011 04 30 02 54 55 31.3200 -97.3300 251.000 30.0 152.106 4.670 -999.990 -999.990 1.521 ..P WKT 2011 04 30 02 59 55 31.3200 -97.3300 251.000 122.0 149.923 3.410 -999.990 -999.990 1.499 ..P WKT 2011 04 30 03 04 55 31.3200 -97.3300 251.000 457.0 147.906 4.100 -999.990 -999.990 1.479 ..P WKT 2011 04 30 03 14 55 31.3200 -97.3300 251.000 30.0 147.282 4.460 -999.990 -999.990 1.473 ..P WKT 2011 04 30 03 19 55 31.3200 -97.3300 251.000 122.0 152.325 4.410 -999.990 -999.990 1.523 ..P WKT 2011 04 30 03 24 55 31.3200 -97.3300 251.000 457.0 149.905 4.450 -999.990 -999.990 1.499 ..P WKT 2011 04 30 03 29 55 31.3200 -97.3300 251.000 30.0 148.480 4.940 -999.990 -999.990 1.485 ..P WKT 2011 04 30 03 34 55 31.3200 -97.3300 251.000 122.0 148.049 4.770 -999.990 -999.990 1.480 ..P WKT 2011 04 30 03 39 55 31.3200 -97.3300 251.000 457.0 140.652 5.400 -999.990 -999.990 1.407 ..P WKT 2011 04 30 03 49 55 31.3200 -97.3300 251.000 30.0 150.622 5.300 -999.990 -999.990 1.506 ..P WKT 2011 04 30 03 54 55 31.3200 -97.3300 251.000 122.0 145.593 4.630 -999.990 -999.990 1.456 ..P WKT 2011 04 30 03 59 55 31.3200 -97.3300 251.000 457.0 146.372 4.500 -999.990 -999.990 1.464 ..P WKT 2011 04 30 04 04 55 31.3200 -97.3300 251.000 30.0 148.976 4.310 -999.990 -999.990 1.490 ..P WKT 2011 04 30 04 09 55 31.3200 -97.3300 251.000 122.0 153.736 4.470 -999.990 -999.990 1.537 ..P WKT 2011 04 30 04 14 55 31.3200 -97.3300 251.000 457.0 144.062 4.440 -999.990 -999.990 1.441 ..P WKT 2011 04 30 04 24 55 31.3200 -97.3300 251.000 30.0 147.752 4.320 -999.990 -999.990 1.478 ..P WKT 2011 04 30 04 29 55 31.3200 -97.3300 251.000 122.0 148.839 3.670 -999.990 -999.990 1.488 ..P WKT 2011 04 30 04 34 55 31.3200 -97.3300 251.000 457.0 144.616 3.440 -999.990 -999.990 1.446 ..P WKT 2011 04 30 04 39 55 31.3200 -97.3300 251.000 30.0 144.375 3.200 -999.990 -999.990 1.444 ..P WKT 2011 04 30 04 44 55 31.3200 -97.3300 251.000 122.0 144.631 3.340 -999.990 -999.990 1.446 ..P WKT 2011 04 30 04 49 55 31.3200 -97.3300 251.000 457.0 145.552 3.250 -999.990 -999.990 1.456 ..P WKT 2011 04 30 05 04 55 31.3200 -97.3300 251.000 30.0 147.877 4.200 -999.990 -999.990 1.479 ..P WKT 2011 04 30 05 09 55 31.3200 -97.3300 251.000 122.0 154.140 3.070 -999.990 -999.990 1.541 ..P WKT 2011 04 30 05 14 55 31.3200 -97.3300 251.000 457.0 157.083 4.430 -999.990 -999.990 1.571 ..P WKT 2011 04 30 05 19 55 31.3200 -97.3300 251.000 30.0 154.382 4.970 -999.990 -999.990 1.544 ..P WKT 2011 04 30 05 24 55 31.3200 -97.3300 251.000 122.0 160.313 3.490 -999.990 -999.990 1.603 ..P WKT 2011 04 30 05 29 55 31.3200 -97.3300 251.000 457.0 154.624 4.450 -999.990 -999.990 1.546 ..P WKT 2011 04 30 05 39 55 31.3200 -97.3300 251.000 30.0 158.323 3.890 -999.990 -999.990 1.583 ..P WKT 2011 04 30 05 44 55 31.3200 -97.3300 251.000 122.0 154.098 4.070 -999.990 -999.990 1.541 ..P WKT 2011 04 30 05 49 55 31.3200 -97.3300 251.000 457.0 149.872 3.920 -999.990 -999.990 1.499 ..P WKT 2011 04 30 05 54 55 31.3200 -97.3300 251.000 30.0 147.307 3.380 -999.990 -999.990 1.473 ..P WKT 2011 04 30 05 59 55 31.3200 -97.3300 251.000 122.0 144.742 6.020 -999.990 -999.990 1.447 ..P WKT 2011 04 30 06 04 55 31.3200 -97.3300 251.000 457.0 150.811 3.850 -999.990 -999.990 1.508 ..P WKT 2011 04 30 06 14 55 31.3200 -97.3300 251.000 30.0 153.627 3.860 -999.990 -999.990 1.536 ..P WKT 2011 04 30 06 19 55 31.3200 -97.3300 251.000 122.0 151.701 3.540 -999.990 -999.990 1.517 ..P WKT 2011 04 30 06 24 55 31.3200 -97.3300 251.000 457.0 149.444 3.550 -999.990 -999.990 1.494 ..P WKT 2011 04 30 06 29 55 31.3200 -97.3300 251.000 30.0 141.871 3.310 -999.990 -999.990 1.419 ..P WKT 2011 04 30 06 34 55 31.3200 -97.3300 251.000 122.0 145.925 4.010 -999.990 -999.990 1.459 ..P WKT 2011 04 30 06 39 55 31.3200 -97.3300 251.000 457.0 143.003 3.120 -999.990 -999.990 1.430 ..P WKT 2011 04 30 06 49 55 31.3200 -97.3300 251.000 30.0 147.480 3.740 -999.990 -999.990 1.475 ..P WKT 2011 04 30 06 54 55 31.3200 -97.3300 251.000 122.0 147.406 3.720 -999.990 -999.990 1.474 ..P WKT 2011 04 30 06 59 55 31.3200 -97.3300 251.000 457.0 153.145 3.720 -999.990 -999.990 1.531 ..P WKT 2011 04 30 07 04 55 31.3200 -97.3300 251.000 30.0 147.255 4.320 -999.990 -999.990 1.473 ..P WKT 2011 04 30 07 09 55 31.3200 -97.3300 251.000 122.0 153.660 3.460 -999.990 -999.990 1.537 ..P WKT 2011 04 30 07 14 55 31.3200 -97.3300 251.000 457.0 158.736 3.900 -999.990 -999.990 1.587 ..P WKT 2011 04 30 07 24 55 31.3200 -97.3300 251.000 30.0 155.549 4.250 -999.990 -999.990 1.555 ..P WKT 2011 04 30 07 29 55 31.3200 -97.3300 251.000 122.0 153.433 4.350 -999.990 -999.990 1.534 ..P WKT 2011 04 30 07 34 55 31.3200 -97.3300 251.000 457.0 165.440 3.550 -999.990 -999.990 1.654 ..P WKT 2011 04 30 07 39 55 31.3200 -97.3300 251.000 30.0 157.675 3.620 -999.990 -999.990 1.577 ..P WKT 2011 04 30 07 44 55 31.3200 -97.3300 251.000 122.0 157.886 5.050 -999.990 -999.990 1.579 ..P WKT 2011 04 30 07 49 55 31.3200 -97.3300 251.000 457.0 166.406 3.850 -999.990 -999.990 1.664 ..P WKT 2011 04 30 07 59 55 31.3200 -97.3300 251.000 30.0 156.095 3.760 -999.990 -999.990 1.561 ..P WKT 2011 04 30 08 04 55 31.3200 -97.3300 251.000 122.0 163.191 3.790 -999.990 -999.990 1.632 ..P WKT 2011 04 30 08 09 55 31.3200 -97.3300 251.000 457.0 170.620 3.370 -999.990 -999.990 1.706 ..P WKT 2011 04 30 08 14 55 31.3200 -97.3300 251.000 30.0 164.254 4.320 -999.990 -999.990 1.643 ..P WKT 2011 04 30 08 19 55 31.3200 -97.3300 251.000 122.0 173.511 3.960 -999.990 -999.990 1.735 ..P WKT 2011 04 30 08 24 55 31.3200 -97.3300 251.000 457.0 168.640 3.570 -999.990 -999.990 1.686 ..P WKT 2011 04 30 08 34 55 31.3200 -97.3300 251.000 30.0 163.552 3.370 -999.990 -999.990 1.636 ..P WKT 2011 04 30 08 39 55 31.3200 -97.3300 251.000 122.0 163.834 4.210 -999.990 -999.990 1.638 ..P WKT 2011 04 30 08 44 55 31.3200 -97.3300 251.000 457.0 172.928 3.570 -999.990 -999.990 1.729 ..P WKT 2011 04 30 08 49 55 31.3200 -97.3300 251.000 30.0 163.068 3.460 -999.990 -999.990 1.631 ..P WKT 2011 04 30 08 54 55 31.3200 -97.3300 251.000 122.0 165.844 3.910 -999.990 -999.990 1.658 ..P WKT 2011 04 30 08 59 55 31.3200 -97.3300 251.000 457.0 174.606 4.020 -999.990 -999.990 1.746 ..P WKT 2011 04 30 09 09 55 31.3200 -97.3300 251.000 30.0 166.072 3.400 -999.990 -999.990 1.661 ..P WKT 2011 04 30 09 14 55 31.3200 -97.3300 251.000 122.0 170.726 3.900 -999.990 -999.990 1.707 ..P WKT 2011 04 30 09 19 55 31.3200 -97.3300 251.000 457.0 173.051 3.960 -999.990 -999.990 1.731 ..P WKT 2011 04 30 09 24 55 31.3200 -97.3300 251.000 30.0 173.048 4.390 -999.990 -999.990 1.730 ..P WKT 2011 04 30 09 29 55 31.3200 -97.3300 251.000 122.0 171.050 4.090 -999.990 -999.990 1.711 ..P WKT 2011 04 30 09 34 55 31.3200 -97.3300 251.000 457.0 178.698 4.280 -999.990 -999.990 1.787 ..P WKT 2011 04 30 09 44 55 31.3200 -97.3300 251.000 30.0 167.572 4.000 -999.990 -999.990 1.676 ..P WKT 2011 04 30 09 49 55 31.3200 -97.3300 251.000 122.0 169.090 4.800 -999.990 -999.990 1.691 ..P WKT 2011 04 30 09 54 55 31.3200 -97.3300 251.000 457.0 176.596 4.590 -999.990 -999.990 1.766 ..P WKT 2011 04 30 09 59 55 31.3200 -97.3300 251.000 30.0 168.799 4.880 -999.990 -999.990 1.688 ..P WKT 2011 04 30 10 04 55 31.3200 -97.3300 251.000 122.0 171.648 4.400 -999.990 -999.990 1.716 ..P WKT 2011 04 30 10 09 55 31.3200 -97.3300 251.000 457.0 -999.999 -999.990 -999.990 -999.990 -10.000 F.P WKT 2011 04 30 10 19 55 31.3200 -97.3300 251.000 30.0 165.032 3.960 -999.990 -999.990 1.650 ..P WKT 2011 04 30 10 24 55 31.3200 -97.3300 251.000 122.0 171.352 4.500 -999.990 -999.990 1.714 ..P WKT 2011 04 30 10 29 55 31.3200 -97.3300 251.000 457.0 180.333 5.090 -999.990 -999.990 1.803 ..P WKT 2011 04 30 10 34 55 31.3200 -97.3300 251.000 30.0 174.341 5.710 -999.990 -999.990 1.743 ..P WKT 2011 04 30 10 39 55 31.3200 -97.3300 251.000 122.0 173.673 3.790 -999.990 -999.990 1.737 ..P WKT 2011 04 30 10 44 55 31.3200 -97.3300 251.000 457.0 182.323 4.030 -999.990 -999.990 1.823 ..P WKT 2011 04 30 10 54 55 31.3200 -97.3300 251.000 30.0 170.646 4.220 -999.990 -999.990 1.706 ..P WKT 2011 04 30 10 59 55 31.3200 -97.3300 251.000 122.0 175.445 5.260 -999.990 -999.990 1.754 ..P WKT 2011 04 30 11 04 55 31.3200 -97.3300 251.000 457.0 198.884 4.290 -999.990 -999.990 1.989 ..P WKT 2011 04 30 11 09 55 31.3200 -97.3300 251.000 30.0 174.726 5.040 -999.990 -999.990 1.747 ..P WKT 2011 04 30 11 14 55 31.3200 -97.3300 251.000 122.0 182.855 4.790 -999.990 -999.990 1.829 ..P WKT 2011 04 30 11 19 55 31.3200 -97.3300 251.000 457.0 192.649 4.300 -999.990 -999.990 1.926 ..P WKT 2011 04 30 11 29 55 31.3200 -97.3300 251.000 30.0 184.631 4.500 -999.990 -999.990 1.846 ..P WKT 2011 04 30 11 34 55 31.3200 -97.3300 251.000 122.0 186.960 4.890 -999.990 -999.990 1.870 ..P WKT 2011 04 30 11 39 55 31.3200 -97.3300 251.000 457.0 194.282 4.650 -999.990 -999.990 1.943 ..P WKT 2011 04 30 11 44 55 31.3200 -97.3300 251.000 30.0 182.960 4.720 -999.990 -999.990 1.830 ..P WKT 2011 04 30 11 49 55 31.3200 -97.3300 251.000 122.0 188.617 4.560 -999.990 -999.990 1.886 ..P WKT 2011 04 30 12 09 55 31.3200 -97.3300 251.000 457.0 203.037 4.710 -999.990 -999.990 2.030 ..P WKT 2011 04 30 12 10 25 31.3200 -97.3300 251.000 457.0 199.054 5.630 -999.990 -999.990 1.991 ..P WKT 2011 04 30 12 10 55 31.3200 -97.3300 251.000 457.0 199.230 4.980 -999.990 -999.990 1.992 ..P WKT 2011 04 30 12 11 25 31.3200 -97.3300 251.000 457.0 198.077 4.760 -999.990 -999.990 1.981 ..P WKT 2011 04 30 12 11 55 31.3200 -97.3300 251.000 457.0 203.579 4.580 -999.990 -999.990 2.036 ..P WKT 2011 04 30 12 12 25 31.3200 -97.3300 251.000 457.0 200.594 4.740 -999.990 -999.990 2.006 ..P WKT 2011 04 30 12 12 55 31.3200 -97.3300 251.000 457.0 205.929 4.700 -999.990 -999.990 2.059 ..P WKT 2011 04 30 12 13 25 31.3200 -97.3300 251.000 457.0 204.609 4.650 -999.990 -999.990 2.046 ..P WKT 2011 04 30 12 13 55 31.3200 -97.3300 251.000 457.0 208.945 4.530 -999.990 -999.990 2.089 ..P WKT 2011 04 30 12 14 25 31.3200 -97.3300 251.000 457.0 208.955 5.210 -999.990 -999.990 2.090 ..P WKT 2011 04 30 12 14 55 31.3200 -97.3300 251.000 457.0 203.808 4.600 -999.990 -999.990 2.038 ..P WKT 2011 04 30 12 19 55 31.3200 -97.3300 251.000 30.0 193.604 4.510 -999.990 -999.990 1.936 ..P WKT 2011 04 30 12 24 55 31.3200 -97.3300 251.000 122.0 200.365 5.770 -999.990 -999.990 2.004 ..P WKT 2011 04 30 12 29 55 31.3200 -97.3300 251.000 457.0 204.129 4.480 -999.990 -999.990 2.041 ..P WKT 2011 04 30 12 34 55 31.3200 -97.3300 251.000 30.0 193.267 4.380 -999.990 -999.990 1.933 ..P WKT 2011 04 30 12 39 55 31.3200 -97.3300 251.000 122.0 195.038 4.740 -999.990 -999.990 1.950 ..P WKT 2011 04 30 12 44 55 31.3200 -97.3300 251.000 457.0 204.947 5.420 -999.990 -999.990 2.049 ..P WKT 2011 04 30 12 54 55 31.3200 -97.3300 251.000 30.0 192.366 4.210 -999.990 -999.990 1.924 ..P WKT 2011 04 30 12 59 55 31.3200 -97.3300 251.000 122.0 197.942 5.320 -999.990 -999.990 1.979 ..P WKT 2011 04 30 13 04 55 31.3200 -97.3300 251.000 457.0 206.170 4.550 -999.990 -999.990 2.062 ..P WKT 2011 04 30 13 09 55 31.3200 -97.3300 251.000 30.0 196.478 3.710 -999.990 -999.990 1.965 ..P WKT 2011 04 30 13 14 55 31.3200 -97.3300 251.000 122.0 201.053 3.470 -999.990 -999.990 2.011 ..P WKT 2011 04 30 13 19 55 31.3200 -97.3300 251.000 457.0 217.896 3.380 -999.990 -999.990 2.179 ..P WKT 2011 04 30 13 29 55 31.3200 -97.3300 251.000 30.0 196.537 3.700 -999.990 -999.990 1.965 ..P WKT 2011 04 30 13 34 55 31.3200 -97.3300 251.000 122.0 197.794 3.180 -999.990 -999.990 1.978 ..P WKT 2011 04 30 13 39 55 31.3200 -97.3300 251.000 457.0 205.676 4.460 -999.990 -999.990 2.057 ..P WKT 2011 04 30 13 44 55 31.3200 -97.3300 251.000 30.0 193.021 3.690 -999.990 -999.990 1.930 ..P WKT 2011 04 30 13 49 55 31.3200 -97.3300 251.000 122.0 196.927 3.230 -999.990 -999.990 1.969 ..P WKT 2011 04 30 13 54 55 31.3200 -97.3300 251.000 457.0 204.803 3.300 -999.990 -999.990 2.048 ..P WKT 2011 04 30 14 04 55 31.3200 -97.3300 251.000 30.0 194.690 3.410 -999.990 -999.990 1.947 ..P WKT 2011 04 30 14 09 55 31.3200 -97.3300 251.000 122.0 208.136 3.950 -999.990 -999.990 2.081 ..P WKT 2011 04 30 14 14 55 31.3200 -97.3300 251.000 457.0 214.963 4.230 -999.990 -999.990 2.150 ..P WKT 2011 04 30 14 19 55 31.3200 -97.3300 251.000 30.0 203.603 3.740 -999.990 -999.990 2.036 ..P WKT 2011 04 30 14 24 55 31.3200 -97.3300 251.000 122.0 209.765 4.860 -999.990 -999.990 2.098 ..P WKT 2011 04 30 14 29 55 31.3200 -97.3300 251.000 457.0 210.968 3.080 -999.990 -999.990 2.110 ..P WKT 2011 04 30 14 39 55 31.3200 -97.3300 251.000 30.0 209.693 4.250 -999.990 -999.990 2.097 ..P WKT 2011 04 30 14 44 55 31.3200 -97.3300 251.000 122.0 210.683 4.900 -999.990 -999.990 2.107 ..P WKT 2011 04 30 14 49 55 31.3200 -97.3300 251.000 457.0 215.798 4.280 -999.990 -999.990 2.158 ..P WKT 2011 04 30 14 54 55 31.3200 -97.3300 251.000 30.0 209.197 3.750 -999.990 -999.990 2.092 ..P WKT 2011 04 30 14 59 55 31.3200 -97.3300 251.000 122.0 214.474 4.040 -999.990 -999.990 2.145 ..P WKT 2011 04 30 15 04 55 31.3200 -97.3300 251.000 457.0 227.995 3.200 -999.990 -999.990 2.280 ..P WKT 2011 04 30 15 14 55 31.3200 -97.3300 251.000 30.0 217.365 4.050 -999.990 -999.990 2.174 ..P WKT 2011 04 30 15 19 55 31.3200 -97.3300 251.000 122.0 223.883 3.360 -999.990 -999.990 2.239 ..P WKT 2011 04 30 15 24 55 31.3200 -97.3300 251.000 457.0 237.646 3.670 -999.990 -999.990 2.376 ..P WKT 2011 04 30 15 29 55 31.3200 -97.3300 251.000 30.0 225.710 4.460 -999.990 -999.990 2.257 ..P WKT 2011 04 30 15 34 55 31.3200 -97.3300 251.000 122.0 226.787 4.320 -999.990 -999.990 2.268 ..P WKT 2011 04 30 15 39 55 31.3200 -97.3300 251.000 457.0 228.522 3.780 -999.990 -999.990 2.285 ..P WKT 2011 04 30 15 49 55 31.3200 -97.3300 251.000 30.0 230.133 4.510 -999.990 -999.990 2.301 ..P WKT 2011 04 30 15 54 55 31.3200 -97.3300 251.000 122.0 236.918 4.210 -999.990 -999.990 2.369 ..P WKT 2011 04 30 15 59 55 31.3200 -97.3300 251.000 457.0 232.189 4.310 -999.990 -999.990 2.322 ..P WKT 2011 04 30 16 04 55 31.3200 -97.3300 251.000 30.0 229.598 5.510 -999.990 -999.990 2.296 ..P WKT 2011 04 30 16 09 55 31.3200 -97.3300 251.000 122.0 233.256 5.100 -999.990 -999.990 2.333 ..P WKT 2011 04 30 16 14 55 31.3200 -97.3300 251.000 457.0 232.803 4.710 -999.990 -999.990 2.328 ..P WKT 2011 04 30 16 24 55 31.3200 -97.3300 251.000 30.0 230.795 4.510 -999.990 -999.990 2.308 ..P WKT 2011 04 30 16 29 55 31.3200 -97.3300 251.000 122.0 234.331 4.090 -999.990 -999.990 2.343 ..P WKT 2011 04 30 16 34 55 31.3200 -97.3300 251.000 457.0 227.031 4.480 -999.990 -999.990 2.270 ..P WKT 2011 04 30 16 39 55 31.3200 -97.3300 251.000 30.0 230.238 4.440 -999.990 -999.990 2.302 ..P WKT 2011 04 30 16 44 55 31.3200 -97.3300 251.000 122.0 233.279 4.020 -999.990 -999.990 2.333 ..P WKT 2011 04 30 16 49 55 31.3200 -97.3300 251.000 457.0 232.710 3.110 -999.990 -999.990 2.327 ..P WKT 2011 04 30 17 04 55 31.3200 -97.3300 251.000 30.0 234.539 4.080 -999.990 -999.990 2.345 ..P WKT 2011 04 30 17 09 55 31.3200 -97.3300 251.000 122.0 238.851 5.270 -999.990 -999.990 2.389 ..P WKT 2011 04 30 17 14 55 31.3200 -97.3300 251.000 457.0 236.935 4.400 -999.990 -999.990 2.369 ..P WKT 2011 04 30 17 19 55 31.3200 -97.3300 251.000 30.0 233.055 3.110 -999.990 -999.990 2.331 ..P WKT 2011 04 30 17 24 55 31.3200 -97.3300 251.000 122.0 239.983 3.480 -999.990 -999.990 2.400 ..P WKT 2011 04 30 17 29 55 31.3200 -97.3300 251.000 457.0 236.105 3.630 -999.990 -999.990 2.361 ..P WKT 2011 04 30 17 39 55 31.3200 -97.3300 251.000 30.0 236.498 3.480 -999.990 -999.990 2.365 ..P WKT 2011 04 30 17 44 55 31.3200 -97.3300 251.000 122.0 239.131 4.300 -999.990 -999.990 2.391 ..P WKT 2011 04 30 17 49 55 31.3200 -97.3300 251.000 457.0 229.336 3.910 -999.990 -999.990 2.293 ..P WKT 2011 04 30 17 54 55 31.3200 -97.3300 251.000 30.0 231.969 3.900 -999.990 -999.990 2.320 ..P WKT 2011 04 30 17 59 55 31.3200 -97.3300 251.000 122.0 230.352 4.560 -999.990 -999.990 2.304 ..P WKT 2011 04 30 18 04 55 31.3200 -97.3300 251.000 457.0 226.447 3.830 -999.990 -999.990 2.264 ..P WKT 2011 04 30 18 14 55 31.3200 -97.3300 251.000 30.0 240.480 3.630 -999.990 -999.990 2.405 ..P WKT 2011 04 30 18 19 55 31.3200 -97.3300 251.000 122.0 242.734 4.460 -999.990 -999.990 2.427 ..P WKT 2011 04 30 18 24 55 31.3200 -97.3300 251.000 457.0 242.374 3.560 -999.990 -999.990 2.424 ..P WKT 2011 04 30 18 29 55 31.3200 -97.3300 251.000 30.0 242.668 3.700 -999.990 -999.990 2.427 ..P WKT 2011 04 30 18 34 55 31.3200 -97.3300 251.000 122.0 241.657 3.170 -999.990 -999.990 2.417 ..P WKT 2011 04 30 18 39 55 31.3200 -97.3300 251.000 457.0 236.895 3.560 -999.990 -999.990 2.369 ..P WKT 2011 04 30 18 49 55 31.3200 -97.3300 251.000 30.0 231.756 3.060 -999.990 -999.990 2.318 ..P WKT 2011 04 30 18 54 55 31.3200 -97.3300 251.000 122.0 244.088 3.350 -999.990 -999.990 2.441 ..P WKT 2011 04 30 18 59 55 31.3200 -97.3300 251.000 457.0 242.402 4.150 -999.990 -999.990 2.424 ..P WKT 2011 04 30 19 04 55 31.3200 -97.3300 251.000 30.0 245.604 3.440 -999.990 -999.990 2.456 ..P WKT 2011 04 30 19 09 55 31.3200 -97.3300 251.000 122.0 245.547 3.220 -999.990 -999.990 2.455 ..P WKT 2011 04 30 19 14 55 31.3200 -97.3300 251.000 457.0 245.164 3.050 -999.990 -999.990 2.452 ..P WKT 2011 04 30 19 24 55 31.3200 -97.3300 251.000 30.0 244.516 4.050 -999.990 -999.990 2.445 ..P WKT 2011 04 30 19 29 55 31.3200 -97.3300 251.000 122.0 246.691 3.950 -999.990 -999.990 2.467 ..P WKT 2011 04 30 19 34 55 31.3200 -97.3300 251.000 457.0 244.310 3.840 -999.990 -999.990 2.443 ..P WKT 2011 04 30 19 39 55 31.3200 -97.3300 251.000 30.0 248.109 3.980 -999.990 -999.990 2.481 ..P WKT 2011 04 30 19 44 55 31.3200 -97.3300 251.000 122.0 252.557 3.830 -999.990 -999.990 2.526 ..P WKT 2011 04 30 19 49 55 31.3200 -97.3300 251.000 457.0 248.389 3.390 -999.990 -999.990 2.484 ..P WKT 2011 04 30 19 59 55 31.3200 -97.3300 251.000 30.0 248.298 3.590 -999.990 -999.990 2.483 ..P WKT 2011 04 30 20 04 55 31.3200 -97.3300 251.000 122.0 255.616 3.850 -999.990 -999.990 2.556 ..P WKT 2011 04 30 20 09 55 31.3200 -97.3300 251.000 457.0 250.595 3.680 -999.990 -999.990 2.506 ..P WKT 2011 04 30 20 14 55 31.3200 -97.3300 251.000 30.0 245.900 4.810 -999.990 -999.990 2.459 ..P WKT 2011 04 30 20 19 55 31.3200 -97.3300 251.000 122.0 253.052 5.420 -999.990 -999.990 2.531 ..P WKT 2011 04 30 20 24 55 31.3200 -97.3300 251.000 457.0 246.413 4.150 -999.990 -999.990 2.464 ..P WKT 2011 04 30 20 34 55 31.3200 -97.3300 251.000 30.0 239.954 4.030 -999.990 -999.990 2.400 ..P WKT 2011 04 30 20 39 55 31.3200 -97.3300 251.000 122.0 250.340 4.560 -999.990 -999.990 2.503 ..P WKT 2011 04 30 20 44 55 31.3200 -97.3300 251.000 457.0 240.630 4.320 -999.990 -999.990 2.406 ..P WKT 2011 04 30 20 49 55 31.3200 -97.3300 251.000 30.0 237.405 4.370 -999.990 -999.990 2.374 ..P WKT 2011 04 30 20 54 55 31.3200 -97.3300 251.000 122.0 244.545 6.060 -999.990 -999.990 2.445 ..P WKT 2011 04 30 20 59 55 31.3200 -97.3300 251.000 457.0 241.968 5.400 -999.990 -999.990 2.420 ..P WKT 2011 04 30 21 09 55 31.3200 -97.3300 251.000 30.0 246.295 4.720 -999.990 -999.990 2.463 ..P WKT 2011 04 30 21 14 55 31.3200 -97.3300 251.000 122.0 248.988 4.880 -999.990 -999.990 2.490 ..P WKT 2011 04 30 21 19 55 31.3200 -97.3300 251.000 457.0 246.504 4.160 -999.990 -999.990 2.465 ..P WKT 2011 04 30 21 24 55 31.3200 -97.3300 251.000 30.0 244.345 3.980 -999.990 -999.990 2.443 ..P WKT 2011 04 30 21 29 55 31.3200 -97.3300 251.000 122.0 248.007 4.510 -999.990 -999.990 2.480 ..P WKT 2011 04 30 21 34 55 31.3200 -97.3300 251.000 457.0 236.800 3.250 -999.990 -999.990 2.368 ..P WKT 2011 04 30 21 44 55 31.3200 -97.3300 251.000 30.0 236.829 4.520 -999.990 -999.990 2.368 ..P WKT 2011 04 30 21 49 55 31.3200 -97.3300 251.000 122.0 239.981 3.580 -999.990 -999.990 2.400 ..P WKT 2011 04 30 21 54 55 31.3200 -97.3300 251.000 457.0 239.257 4.070 -999.990 -999.990 2.393 ..P WKT 2011 04 30 21 59 55 31.3200 -97.3300 251.000 30.0 243.375 4.050 -999.990 -999.990 2.434 ..P WKT 2011 04 30 22 04 55 31.3200 -97.3300 251.000 122.0 244.587 4.420 -999.990 -999.990 2.446 ..P WKT 2011 04 30 22 09 55 31.3200 -97.3300 251.000 457.0 238.701 4.900 -999.990 -999.990 2.387 ..P WKT 2011 04 30 22 19 55 31.3200 -97.3300 251.000 30.0 243.152 4.600 -999.990 -999.990 2.432 ..P WKT 2011 04 30 22 24 55 31.3200 -97.3300 251.000 122.0 239.941 4.290 -999.990 -999.990 2.399 ..P WKT 2011 04 30 22 29 55 31.3200 -97.3300 251.000 457.0 237.539 5.280 -999.990 -999.990 2.375 ..P WKT 2011 04 30 22 34 55 31.3200 -97.3300 251.000 30.0 236.103 3.960 -999.990 -999.990 2.361 ..P WKT 2011 04 30 22 39 55 31.3200 -97.3300 251.000 122.0 233.219 4.210 -999.990 -999.990 2.332 ..P WKT 2011 04 30 22 44 55 31.3200 -97.3300 251.000 457.0 237.099 3.230 -999.990 -999.990 2.371 ..P WKT 2011 04 30 22 54 55 31.3200 -97.3300 251.000 30.0 232.071 3.760 -999.990 -999.990 2.321 ..P WKT 2011 04 30 22 59 55 31.3200 -97.3300 251.000 122.0 238.132 3.700 -999.990 -999.990 2.381 ..P WKT 2011 04 30 23 04 55 31.3200 -97.3300 251.000 457.0 233.413 3.510 -999.990 -999.990 2.334 ..P WKT 2011 04 30 23 09 55 31.3200 -97.3300 251.000 30.0 231.268 4.120 -999.990 -999.990 2.313 ..P WKT 2011 04 30 23 14 55 31.3200 -97.3300 251.000 122.0 243.433 4.210 -999.990 -999.990 2.434 ..P WKT 2011 04 30 23 19 55 31.3200 -97.3300 251.000 457.0 231.966 4.530 -999.990 -999.990 2.320 ..P WKT 2011 04 30 23 29 55 31.3200 -97.3300 251.000 30.0 224.997 4.490 -999.990 -999.990 2.250 ..P WKT 2011 04 30 23 34 55 31.3200 -97.3300 251.000 122.0 232.376 4.290 -999.990 -999.990 2.324 ..P WKT 2011 04 30 23 39 55 31.3200 -97.3300 251.000 457.0 225.301 4.710 -999.990 -999.990 2.253 ..P WKT 2011 04 30 23 44 55 31.3200 -97.3300 251.000 30.0 223.528 4.390 -999.990 -999.990 2.235 ..P WKT 2011 04 30 23 49 55 31.3200 -97.3300 251.000 122.0 220.953 4.840 -999.990 -999.990 2.210 ..P