# number_of_header_lines: 71 # comment: # comment: ************ USE OF ESRL GMD DATA **************** # comment: # comment: These data are made freely available to the public and the # comment: scientific community in the belief that their wide dissemination # comment: will lead to greater understanding and new scientific insights. # comment: The availability of these data does not constitute publication # comment: of the data. NOAA relies on the ethics and integrity of the user to # comment: ensure that GML receives fair credit for their work. If the data # comment: are obtained for potential use in a publication or presentation, # comment: GML should be informed at the outset of the nature of this work. # comment: If the GML data are essential to the work, or if an important # comment: result or conclusion depends on the GML data, co-authorship # comment: may be appropriate. This should be discussed at an early stage in # comment: the work. Manuscripts using the GML data should be sent to GML # comment: for review before they are submitted for publication so we can # comment: ensure that the quality and limitations of the data are accurately # comment: represented. # comment: Please see accompanying README file, if available, for citation text. # comment: # comment: Every effort is made to produce the most accurate and precise # comment: measurements possible. However, we reserve the right to make # comment: corrections to the data based on recalibration of standard gases # comment: or for other reasons deemed scientifically justified. # comment: # comment: We are not responsible for results and conclusions based on use # comment: of these data without regard to this warning. # comment: # contact_parameter: CO2 CCGG (Individual Flasks) # contact_name: Ed Dlugokencky # contact_telephone: (303) 497-6228 # contact_email: Ed.Dlugokencky@noaa.gov # comment: # comment: ************ COLLABORATORS *************** # comment: # comment: NOAA thanks the following collaborators without # comment: whom these measurements would not be possible. # comment: # collaborator_name: Sistema Internacional de Monitoreo Ambiental # collaborator_name: [SIMA] # collaborator_url: http://www.sima.com.mx/ # comment: # comment: ************ RECIPROCITY AGREEMENT *************** # comment: # comment: Use of these data implies an agreement to reciprocate. # comment: Laboratories making similar measurements agree to make their # comment: own data available to the general public and to the scientific # comment: community in an equally complete and easily accessible form. # comment: Modelers are encouraged to make available to the community, # comment: upon request, their own tools used in the interpretation # comment: of the GML data, namely well documented model code, transport # comment: fields, and additional information necessary for other # comment: scientists to repeat the work and to run modified versions. # comment: Model availability includes collaborative support for new # comment: users of the models. # comment: # comment: ************ DATA DESCRIPTION *************** # comment: # description_site-code: mex # description_project-abbr: ccg_surface # description_strategy-abbr: flask # description_sample-constraints: me:-H~date:1900-01-01,2020-12-31 # description_creation-time: 2021-07-30 09:28:43 # comment: # comment: ************ DATA DOCUMENTATION *************** # comment: # comment: Please refer to the species-specific README file in the # comment: appropriate directory folder at ftp://aftp.cmdl.noaa.gov/data/trace_gases/. # comment: # data_fields: sample_site_code sample_year sample_month sample_day sample_hour sample_minute sample_seconds sample_id sample_method parameter_formula analysis_group_abbr analysis_value analysis_uncertainty analysis_flag analysis_instrument analysis_year analysis_month analysis_day analysis_hour analysis_minute analysis_seconds sample_latitude sample_longitude sample_altitude sample_elevation sample_intake_height event_number MEX 2009 01 09 18 21 00 1307-99 P co2 CCGG 386.170 0.073 ... L3 2009 01 30 11 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 268330 MEX 2009 01 09 18 21 00 1308-99 P co2 CCGG 386.020 0.073 ... L3 2009 01 30 11 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 268331 MEX 2009 01 19 17 50 00 3543-99 P co2 CCGG 386.650 0.073 ... L3 2009 02 05 16 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 268778 MEX 2009 01 19 17 50 00 3544-99 P co2 CCGG 386.590 0.073 ... L3 2009 02 05 17 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 268779 MEX 2009 01 23 16 32 00 661-99 P co2 CCGG 385.830 0.073 ... L3 2009 02 05 16 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 268776 MEX 2009 01 23 16 32 00 662-99 P co2 CCGG 385.910 0.073 ... L3 2009 02 05 16 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 268777 MEX 2009 01 29 18 00 00 479-99 P co2 CCGG 388.070 0.070 ... L8 2009 03 13 17 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 271298 MEX 2009 01 29 18 00 00 480-99 P co2 CCGG 388.080 0.070 ... L8 2009 03 13 17 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 271299 MEX 2009 02 23 17 11 00 1165-99 P co2 CCGG 388.420 0.070 ... L8 2009 03 13 16 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 271296 MEX 2009 02 23 17 11 00 1166-99 P co2 CCGG 388.380 0.070 ... L8 2009 03 13 16 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 271297 MEX 2009 03 02 16 04 00 6607-66 P co2 CCGG 388.280 0.073 ... L3 2009 05 18 14 31 00 18.9841 -97.3110 4469.00 4464.00 5.00 275396 MEX 2009 03 02 16 04 00 6608-66 P co2 CCGG 388.340 0.073 ... L3 2009 05 18 14 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 275397 MEX 2009 03 03 15 00 00 1727-99 P co2 CCGG 387.020 0.070 ... L8 2009 03 13 16 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 271294 MEX 2009 03 03 15 00 00 1728-99 P co2 CCGG 386.990 0.070 ... L8 2009 03 13 17 09 00 18.9841 -97.3110 4469.00 4464.00 5.00 271295 MEX 2009 03 19 15 58 00 1651-99 P co2 CCGG 400.530 0.070 +.. L8 2009 04 25 13 54 00 18.9841 -97.3110 4469.00 4464.00 5.00 274312 MEX 2009 03 19 15 58 00 1652-99 P co2 CCGG 389.270 0.070 -.. L8 2009 04 25 14 10 00 18.9841 -97.3110 4469.00 4464.00 5.00 274313 MEX 2009 03 26 15 38 00 3087-99 P co2 CCGG 388.020 0.070 ... L8 2009 04 25 13 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 274314 MEX 2009 03 26 15 38 00 3088-99 P co2 CCGG 387.950 0.070 ... L8 2009 04 25 13 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 274315 MEX 2009 04 16 15 20 00 3081-99 P co2 CCGG 389.000 0.073 ... L3 2009 05 18 14 03 00 18.9841 -97.3110 4469.00 4464.00 5.00 275398 MEX 2009 04 16 15 20 00 3082-99 P co2 CCGG 389.040 0.073 ... L3 2009 05 18 14 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 275399 MEX 2009 04 23 18 30 00 451-99 P co2 CCGG 391.660 0.073 ... L3 2009 05 28 14 43 00 18.9841 -97.3110 4469.00 4464.00 5.00 276019 MEX 2009 04 23 18 30 00 452-99 P co2 CCGG 391.440 0.073 ... L3 2009 05 28 14 57 00 18.9841 -97.3110 4469.00 4464.00 5.00 276020 MEX 2009 04 25 16 27 00 1773-99 P co2 CCGG 388.550 0.070 ... L8 2009 06 01 11 40 00 18.9841 -97.3110 4469.00 4464.00 5.00 276017 MEX 2009 04 25 16 27 00 1774-99 P co2 CCGG 388.480 0.070 ... L8 2009 06 01 11 55 00 18.9841 -97.3110 4469.00 4464.00 5.00 276018 MEX 2009 05 13 17 15 00 763-99 P co2 CCGG 390.940 0.070 ... L10 2009 06 18 12 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 276548 MEX 2009 05 13 17 15 00 764-99 P co2 CCGG 390.920 0.070 ... L10 2009 06 18 13 05 00 18.9841 -97.3110 4469.00 4464.00 5.00 276549 MEX 2009 05 21 21 12 00 2183-99 P co2 CCGG 393.360 0.070 ... L10 2009 06 18 13 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 276550 MEX 2009 05 21 21 12 00 2184-99 P co2 CCGG 393.260 0.070 ... L10 2009 06 18 13 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 276551 MEX 2009 05 28 12 30 00 3633-99 P co2 CCGG 394.310 0.073 ... L3 2009 07 01 10 34 00 18.9841 -97.3110 4469.00 4464.00 5.00 277632 MEX 2009 05 28 12 30 00 3634-99 P co2 CCGG 394.110 0.073 ... L3 2009 07 01 10 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 277633 MEX 2009 06 04 12 30 00 4541-99 P co2 CCGG 390.750 0.073 ... L3 2009 07 01 11 31 00 18.9841 -97.3110 4469.00 4464.00 5.00 277630 MEX 2009 06 04 12 30 00 4542-99 P co2 CCGG 390.720 0.073 ... L3 2009 07 01 11 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 277631 MEX 2009 06 11 19 20 00 3279-99 P co2 CCGG 389.400 0.070 ... L10 2009 07 07 15 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 278339 MEX 2009 06 11 19 20 00 3280-99 P co2 CCGG 389.390 0.070 ... L10 2009 07 07 15 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 278340 MEX 2009 06 18 16 55 00 2853-99 P co2 CCGG 387.650 0.073 ... L3 2009 07 07 14 05 00 18.9841 -97.3110 4469.00 4464.00 5.00 278341 MEX 2009 06 18 16 55 00 2854-99 P co2 CCGG 387.650 0.073 ... L3 2009 07 07 14 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 278342 MEX 2009 06 25 20 00 00 1949-99 P co2 CCGG 387.820 0.070 ... L10 2009 07 17 15 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 279009 MEX 2009 06 25 20 00 00 1950-99 P co2 CCGG 387.490 0.070 ... L10 2009 07 17 16 05 00 18.9841 -97.3110 4469.00 4464.00 5.00 279010 MEX 2009 07 02 18 15 00 3677-99 P co2 CCGG 387.070 0.070 ... L10 2009 07 17 15 19 00 18.9841 -97.3110 4469.00 4464.00 5.00 279007 MEX 2009 07 02 18 15 00 3678-99 P co2 CCGG 387.140 0.070 ... L10 2009 07 17 15 35 00 18.9841 -97.3110 4469.00 4464.00 5.00 279008 MEX 2009 07 09 19 00 00 1639-99 P co2 CCGG 383.520 0.073 ... L3 2009 07 30 14 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 280279 MEX 2009 07 09 19 00 00 1640-99 P co2 CCGG 383.420 0.073 ... L3 2009 07 30 14 16 00 18.9841 -97.3110 4469.00 4464.00 5.00 280280 MEX 2009 07 16 15 55 00 3013-99 P co2 CCGG 387.980 0.073 ... L3 2009 07 30 14 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 280277 MEX 2009 07 16 15 55 00 3014-99 P co2 CCGG 387.900 0.073 ... L3 2009 07 30 14 44 00 18.9841 -97.3110 4469.00 4464.00 5.00 280278 MEX 2009 07 23 17 20 00 2253-99 P co2 CCGG 384.720 0.070 ... L10 2009 08 21 15 27 00 18.9841 -97.3110 4469.00 4464.00 5.00 281474 MEX 2009 07 23 17 20 00 2254-99 P co2 CCGG 384.720 0.070 ... L10 2009 08 21 15 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 281475 MEX 2009 07 31 17 32 00 3209-99 P co2 CCGG 386.690 0.070 ... L10 2009 08 21 14 56 00 18.9841 -97.3110 4469.00 4464.00 5.00 281472 MEX 2009 07 31 17 32 00 3210-99 P co2 CCGG 386.600 0.070 ... L10 2009 08 21 15 11 00 18.9841 -97.3110 4469.00 4464.00 5.00 281473 MEX 2009 08 06 17 00 00 3685-99 P co2 CCGG 383.400 0.070 ... L10 2009 09 01 13 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 282377 MEX 2009 08 06 17 00 00 3686-99 P co2 CCGG 383.220 0.070 ... L10 2009 09 01 13 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 282378 MEX 2009 08 14 15 20 00 1527-99 P co2 CCGG 383.030 0.070 ... L10 2009 09 01 12 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 282379 MEX 2009 08 14 15 20 00 1528-99 P co2 CCGG 383.000 0.070 ... L10 2009 09 01 13 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 282380 MEX 2009 08 21 21 06 00 6157-66 P co2 CCGG 382.770 0.070 ... L10 2009 09 08 14 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 282942 MEX 2009 08 21 21 06 00 6158-66 P co2 CCGG 382.680 0.070 ... L10 2009 09 08 14 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 282943 MEX 2009 08 27 17 30 00 683-99 P co2 CCGG 381.040 0.070 ... L10 2009 09 09 12 02 00 18.9841 -97.3110 4469.00 4464.00 5.00 282934 MEX 2009 08 27 17 30 00 684-99 P co2 CCGG 381.030 0.070 ... L10 2009 09 09 12 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 282935 MEX 2009 09 03 19 30 00 4997-99 P co2 CCGG 382.260 0.070 ... L10 2009 09 21 11 12 00 18.9841 -97.3110 4469.00 4464.00 5.00 283470 MEX 2009 09 03 19 30 00 4998-99 P co2 CCGG 382.230 0.070 ... L10 2009 09 21 11 27 00 18.9841 -97.3110 4469.00 4464.00 5.00 283471 MEX 2009 09 10 19 15 00 655-99 P co2 CCGG 382.890 0.070 ... L10 2009 09 21 11 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 283472 MEX 2009 09 10 19 15 00 656-99 P co2 CCGG 383.180 0.070 ... L10 2009 09 21 11 58 00 18.9841 -97.3110 4469.00 4464.00 5.00 283473 MEX 2009 09 17 17 45 00 3007-99 P co2 CCGG 383.330 0.070 ... L10 2009 10 01 11 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 284289 MEX 2009 09 17 17 45 00 3008-99 P co2 CCGG 383.350 0.070 ... L10 2009 10 01 11 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 284290 MEX 2009 09 24 17 30 00 1139-99 P co2 CCGG 384.250 0.070 ... L10 2009 10 01 10 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 284291 MEX 2009 09 24 17 30 00 1140-99 P co2 CCGG 384.150 0.070 ... L10 2009 10 01 11 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 284292 MEX 2009 10 01 19 00 00 465-99 P co2 CCGG 380.480 0.070 ... L10 2009 10 19 14 26 00 18.9841 -97.3110 4469.00 4464.00 5.00 285134 MEX 2009 10 01 19 00 00 466-99 P co2 CCGG 380.400 0.070 ... L10 2009 10 19 14 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 285135 MEX 2009 10 08 17 00 00 3549-99 P co2 CCGG 383.830 0.070 ... L10 2009 10 19 13 56 00 18.9841 -97.3110 4469.00 4464.00 5.00 285132 MEX 2009 10 08 17 00 00 3550-99 P co2 CCGG 383.880 0.070 ... L10 2009 10 19 14 11 00 18.9841 -97.3110 4469.00 4464.00 5.00 285133 MEX 2009 10 15 12 15 00 3813-99 P co2 CCGG 381.450 0.070 ... L10 2009 11 09 10 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 285712 MEX 2009 10 15 12 15 00 3814-99 P co2 CCGG 381.370 0.070 ... L10 2009 11 09 10 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 285713 MEX 2009 10 22 16 00 00 4169-99 P co2 CCGG 379.190 0.070 ... L10 2009 11 09 10 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 285714 MEX 2009 10 22 16 00 00 4170-99 P co2 CCGG 379.420 0.070 ... L10 2009 11 09 11 09 00 18.9841 -97.3110 4469.00 4464.00 5.00 285715 MEX 2009 10 30 17 30 00 1187-99 P co2 CCGG 382.310 0.070 ... L10 2009 11 25 11 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 286658 MEX 2009 10 30 17 30 00 1188-99 P co2 CCGG 382.270 0.070 ... L10 2009 11 25 11 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 286659 MEX 2009 11 06 20 30 00 4153-99 P co2 CCGG 385.410 0.070 +.. L10 2009 11 25 10 59 00 18.9841 -97.3110 4469.00 4464.00 5.00 286656 MEX 2009 11 06 20 30 00 4154-99 P co2 CCGG 384.830 0.070 -.. L10 2009 11 25 11 15 00 18.9841 -97.3110 4469.00 4464.00 5.00 286657 MEX 2009 11 13 19 10 00 1555-99 P co2 CCGG 385.970 0.070 ... L10 2009 12 07 12 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 287163 MEX 2009 11 13 19 10 00 1556-99 P co2 CCGG 385.920 0.070 ... L10 2009 12 07 12 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 287164 MEX 2009 11 19 19 30 00 6839-66 P co2 CCGG 385.560 0.070 ... L10 2009 12 07 12 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 287165 MEX 2009 11 19 19 30 00 6840-66 P co2 CCGG 385.490 0.070 ... L10 2009 12 07 13 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 287166 MEX 2009 11 27 21 30 00 3027-99 P co2 CCGG 386.420 0.070 ... L10 2010 01 06 12 10 00 18.9841 -97.3110 4469.00 4464.00 5.00 288275 MEX 2009 11 27 21 30 00 3028-99 P co2 CCGG 386.620 0.070 ... L10 2010 01 06 12 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 288276 MEX 2009 12 04 18 00 00 4665-99 P co2 CCGG 386.340 0.070 ... L10 2010 01 06 10 32 00 18.9841 -97.3110 4469.00 4464.00 5.00 288273 MEX 2009 12 04 18 00 00 4666-99 P co2 CCGG 386.380 0.070 ... L10 2010 01 06 10 48 00 18.9841 -97.3110 4469.00 4464.00 5.00 288274 MEX 2009 12 06 17 00 00 4903-99 P co2 CCGG 386.680 0.070 ... L10 2010 01 26 15 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 289049 MEX 2009 12 06 17 00 00 4904-99 P co2 CCGG 386.590 0.070 ... L10 2010 01 26 16 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 289050 MEX 2009 12 18 16 30 00 4123-99 P co2 CCGG 387.940 0.070 ... L10 2010 01 26 15 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 289047 MEX 2009 12 18 16 30 00 4124-99 P co2 CCGG 388.000 0.070 ... L10 2010 01 26 15 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 289048 MEX 2009 12 30 19 30 00 185-99 P co2 CCGG 386.680 0.070 ... L10 2010 02 12 10 26 00 18.9841 -97.3110 4469.00 4464.00 5.00 289944 MEX 2009 12 30 19 30 00 186-99 P co2 CCGG 386.710 0.070 ... L10 2010 02 12 10 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 289945 MEX 2010 01 16 17 00 00 329-99 P co2 CCGG 390.060 0.070 ... L10 2010 02 12 10 59 00 18.9841 -97.3110 4469.00 4464.00 5.00 289946 MEX 2010 01 16 17 00 00 330-99 P co2 CCGG 389.970 0.070 ... L10 2010 02 12 11 14 00 18.9841 -97.3110 4469.00 4464.00 5.00 289947 MEX 2010 03 02 17 43 00 443-99 P co2 CCGG 389.890 0.070 ... L8 2010 04 05 15 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 292999 MEX 2010 03 02 17 43 00 444-99 P co2 CCGG 389.450 0.070 ... L8 2010 04 05 15 56 00 18.9841 -97.3110 4469.00 4464.00 5.00 293000 MEX 2010 03 13 16 10 00 237-99 P co2 CCGG 390.760 0.070 ... L8 2010 04 05 16 11 00 18.9841 -97.3110 4469.00 4464.00 5.00 293001 MEX 2010 03 13 16 10 00 238-99 P co2 CCGG 390.890 0.070 ... L8 2010 04 05 16 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 293002 MEX 2010 03 18 16 45 00 4675-99 P co2 CCGG 391.070 0.070 ... L8 2010 04 12 12 31 00 18.9841 -97.3110 4469.00 4464.00 5.00 293513 MEX 2010 03 18 16 45 00 4676-99 P co2 CCGG 390.980 0.070 ... L8 2010 04 12 12 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 293514 MEX 2010 03 26 18 30 00 3691-99 P co2 CCGG 390.060 0.070 ... L8 2010 04 12 12 02 00 18.9841 -97.3110 4469.00 4464.00 5.00 293511 MEX 2010 03 26 18 30 00 3692-99 P co2 CCGG 390.030 0.070 ... L8 2010 04 12 12 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 293512 MEX 2010 04 05 19 20 00 1825-99 P co2 CCGG 393.810 0.070 ... L8 2010 04 16 11 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 294548 MEX 2010 04 05 19 20 00 1826-99 P co2 CCGG 393.760 0.070 ... L8 2010 04 16 11 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 294549 MEX 2010 04 08 17 50 00 1347-99 P co2 CCGG 392.380 0.070 ... L8 2010 04 16 10 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 294550 MEX 2010 04 15 17 15 00 4479-99 P co2 CCGG 392.240 0.070 ... L8 2010 05 05 14 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 295858 MEX 2010 04 15 17 15 00 4480-99 P co2 CCGG 392.200 0.070 ... L8 2010 05 05 14 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 295859 MEX 2010 04 22 16 15 00 2531-99 P co2 CCGG 390.950 0.070 ... L8 2010 05 05 13 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 295856 MEX 2010 04 22 16 15 00 2532-99 P co2 CCGG 390.950 0.070 ... L8 2010 05 05 14 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 295857 MEX 2010 04 29 18 30 00 1285-99 P co2 CCGG 391.530 0.070 ... L8 2010 05 24 11 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 296534 MEX 2010 04 29 18 30 00 1286-99 P co2 CCGG 391.440 0.070 ... L8 2010 05 24 12 05 00 18.9841 -97.3110 4469.00 4464.00 5.00 296535 MEX 2010 05 07 16 10 00 2521-99 P co2 CCGG 392.490 0.070 ... L8 2010 05 24 12 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 296536 MEX 2010 05 07 16 10 00 2522-99 P co2 CCGG 392.510 0.070 ... L8 2010 05 24 12 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 296537 MEX 2010 05 13 18 11 00 1105-99 P co2 CCGG 392.640 0.070 ... L10 2010 06 03 13 47 00 18.9841 -97.3110 4469.00 4464.00 5.00 297403 MEX 2010 05 13 18 11 00 1106-99 P co2 CCGG 392.570 0.070 ... L10 2010 06 03 14 02 00 18.9841 -97.3110 4469.00 4464.00 5.00 297404 MEX 2010 05 20 15 00 00 2975-99 P co2 CCGG 392.840 0.070 ... L10 2010 06 03 13 14 00 18.9841 -97.3110 4469.00 4464.00 5.00 297405 MEX 2010 05 20 15 00 00 2976-99 P co2 CCGG 392.800 0.070 ... L10 2010 06 03 13 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 297406 MEX 2010 05 27 14 30 00 1379-99 P co2 CCGG 391.930 0.070 ... L8 2010 06 15 13 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 298362 MEX 2010 05 27 14 30 00 1380-99 P co2 CCGG 392.000 0.070 ... L8 2010 06 15 14 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 298363 MEX 2010 06 03 16 15 00 1125-99 P co2 CCGG 392.450 0.070 ... L8 2010 06 15 13 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 298364 MEX 2010 06 03 16 15 00 1126-99 P co2 CCGG 392.490 0.070 ... L8 2010 06 15 13 34 00 18.9841 -97.3110 4469.00 4464.00 5.00 298365 MEX 2010 06 10 14 35 00 585-99 P co2 CCGG 391.500 0.070 ... L8 2010 06 29 10 40 00 18.9841 -97.3110 4469.00 4464.00 5.00 299133 MEX 2010 06 10 14 35 00 586-99 P co2 CCGG 391.310 0.070 ... L8 2010 06 29 10 54 00 18.9841 -97.3110 4469.00 4464.00 5.00 299134 MEX 2010 06 18 15 20 00 2983-99 P co2 CCGG 392.940 0.070 N.. L8 2010 06 29 11 09 00 18.9841 -97.3110 4469.00 4464.00 5.00 299131 MEX 2010 06 18 15 20 00 2984-99 P co2 CCGG 392.740 0.070 N.. L8 2010 06 29 11 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 299132 MEX 2010 06 24 14 20 00 5185-99 P co2 CCGG 390.130 0.070 ... L8 2010 07 09 14 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 299772 MEX 2010 06 24 14 20 00 5186-99 P co2 CCGG 390.330 0.070 ... L8 2010 07 09 15 00 00 18.9841 -97.3110 4469.00 4464.00 5.00 299773 MEX 2010 07 02 14 32 00 5187-99 P co2 CCGG 391.330 0.070 ... L8 2010 07 09 14 16 00 18.9841 -97.3110 4469.00 4464.00 5.00 299774 MEX 2010 07 02 14 32 00 5188-99 P co2 CCGG 391.340 0.070 ... L8 2010 07 09 14 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 299775 MEX 2010 07 08 14 40 00 5109-99 P co2 CCGG 390.990 0.070 ... L8 2010 07 22 10 58 00 18.9841 -97.3110 4469.00 4464.00 5.00 300549 MEX 2010 07 08 14 40 00 5110-99 P co2 CCGG 390.970 0.070 ... L8 2010 07 22 11 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 300550 MEX 2010 07 14 15 35 00 1331-99 P co2 CCGG 389.140 0.070 ... L8 2010 07 22 10 12 00 18.9841 -97.3110 4469.00 4464.00 5.00 300551 MEX 2010 07 14 15 35 00 1332-99 P co2 CCGG 389.030 0.070 ... L8 2010 07 22 10 27 00 18.9841 -97.3110 4469.00 4464.00 5.00 300552 MEX 2010 07 23 14 50 00 3375-99 P co2 CCGG 391.120 0.070 ... L8 2010 08 05 14 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 301377 MEX 2010 07 23 14 50 00 3376-99 P co2 CCGG 390.920 0.070 ... L8 2010 08 05 14 32 00 18.9841 -97.3110 4469.00 4464.00 5.00 301378 MEX 2010 07 29 14 20 00 5041-99 P co2 CCGG 388.470 0.070 ... L8 2010 08 05 14 47 00 18.9841 -97.3110 4469.00 4464.00 5.00 301375 MEX 2010 07 29 14 20 00 5042-99 P co2 CCGG 388.550 0.070 ... L8 2010 08 05 15 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 301376 MEX 2010 08 05 16 50 00 289-99 P co2 CCGG 387.600 0.070 ... L8 2010 08 19 12 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 302135 MEX 2010 08 05 16 50 00 290-99 P co2 CCGG 387.520 0.070 ... L8 2010 08 19 13 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 302136 MEX 2010 08 17 15 15 00 4041-99 P co2 CCGG 387.260 0.070 ... L8 2010 08 24 16 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 302457 MEX 2010 08 17 15 15 00 4042-99 P co2 CCGG 387.150 0.070 ... L8 2010 08 24 16 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 302458 MEX 2010 08 20 14 35 00 3225-99 P co2 CCGG 387.810 0.070 ... L8 2010 08 24 16 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 302455 MEX 2010 08 20 14 35 00 3226-99 P co2 CCGG 387.710 0.070 ... L8 2010 08 24 16 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 302456 MEX 2010 08 26 14 20 00 621-99 P co2 CCGG 386.870 0.070 ... L10 2010 09 10 12 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 303487 MEX 2010 08 26 14 20 00 622-99 P co2 CCGG 386.820 0.070 ... L10 2010 09 10 12 44 00 18.9841 -97.3110 4469.00 4464.00 5.00 303488 MEX 2010 09 02 14 05 00 2867-99 P co2 CCGG 386.700 0.070 ... L10 2010 09 10 11 58 00 18.9841 -97.3110 4469.00 4464.00 5.00 303489 MEX 2010 09 02 14 05 00 2868-99 P co2 CCGG 386.330 0.070 ... L10 2010 09 10 12 14 00 18.9841 -97.3110 4469.00 4464.00 5.00 303490 MEX 2010 09 09 14 44 00 3473-99 P co2 CCGG 385.290 0.070 ... L8 2010 09 17 14 57 00 18.9841 -97.3110 4469.00 4464.00 5.00 304027 MEX 2010 09 09 14 44 00 3474-99 P co2 CCGG 385.210 0.070 ... L8 2010 09 17 15 12 00 18.9841 -97.3110 4469.00 4464.00 5.00 304028 MEX 2010 09 14 14 40 00 2549-99 P co2 CCGG 386.230 0.070 ... L8 2010 09 17 14 28 00 18.9841 -97.3110 4469.00 4464.00 5.00 304029 MEX 2010 09 14 14 40 00 2550-99 P co2 CCGG 386.020 0.070 ... L8 2010 09 17 14 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 304030 MEX 2010 09 27 14 45 00 4447-99 P co2 CCGG 388.680 0.070 ... L10 2010 10 08 11 18 00 18.9841 -97.3110 4469.00 4464.00 5.00 305195 MEX 2010 09 27 14 45 00 4448-99 P co2 CCGG 388.890 0.070 ... L10 2010 10 08 11 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 305196 MEX 2010 09 30 14 30 00 6571-66 P co2 CCGG 386.400 0.070 ... L10 2010 10 08 11 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 305197 MEX 2010 09 30 14 30 00 6572-66 P co2 CCGG 386.280 0.070 ... L10 2010 10 08 12 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 305198 MEX 2010 10 08 14 55 00 4963-99 P co2 CCGG 386.750 0.070 ... L10 2010 10 28 09 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 306535 MEX 2010 10 08 14 55 00 4964-99 P co2 CCGG 386.760 0.070 ... L10 2010 10 28 10 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 306536 MEX 2010 10 16 15 00 00 5247-99 P co2 CCGG 385.260 0.070 ... L10 2010 10 28 10 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 306537 MEX 2010 10 16 15 00 00 5248-99 P co2 CCGG 385.430 0.070 ... L10 2010 10 28 10 32 00 18.9841 -97.3110 4469.00 4464.00 5.00 306538 MEX 2010 10 21 14 45 00 3953-99 P co2 CCGG 385.720 0.070 ... L8 2010 11 03 11 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 306887 MEX 2010 10 21 14 45 00 3954-99 P co2 CCGG 385.640 0.070 ... L8 2010 11 03 11 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 306888 MEX 2010 10 28 14 15 00 1917-99 P co2 CCGG 386.920 0.070 ... L8 2010 11 03 10 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 306885 MEX 2010 10 28 14 15 00 1918-99 P co2 CCGG 387.050 0.070 ... L8 2010 11 03 10 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 306886 MEX 2010 11 04 15 05 00 3351-99 P co2 CCGG 388.350 0.070 ... L8 2010 11 18 15 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 307965 MEX 2010 11 04 15 05 00 3352-99 P co2 CCGG 388.090 0.070 ... L8 2010 11 18 15 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 307966 MEX 2010 11 11 14 30 00 2237-99 P co2 CCGG 388.170 0.070 ... L8 2010 11 18 14 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 307967 MEX 2010 11 11 14 30 00 2238-99 P co2 CCGG 388.200 0.070 ... L8 2010 11 18 15 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 307968 MEX 2010 11 18 15 05 00 5213-99 P co2 CCGG 390.940 0.070 ... L8 2010 12 09 14 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 308642 MEX 2010 11 18 15 05 00 5214-99 P co2 CCGG 390.910 0.070 ... L8 2010 12 09 14 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 308643 MEX 2010 11 26 13 40 00 809-99 P co2 CCGG 389.000 0.070 ... L8 2010 12 09 13 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 308640 MEX 2010 11 26 13 40 00 810-99 P co2 CCGG 388.850 0.070 ... L8 2010 12 09 14 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 308641 MEX 2010 12 28 15 18 00 1527-99 P co2 CCGG 389.580 0.070 ... L10 2011 01 13 12 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 310876 MEX 2010 12 28 15 18 00 1528-99 P co2 CCGG 389.630 0.070 ... L10 2011 01 13 13 03 00 18.9841 -97.3110 4469.00 4464.00 5.00 310877 MEX 2011 01 04 15 43 00 1825-99 P co2 CCGG 389.710 0.070 ... L10 2011 01 13 12 14 00 18.9841 -97.3110 4469.00 4464.00 5.00 310878 MEX 2011 01 04 15 43 00 1826-99 P co2 CCGG 389.650 0.070 ... L10 2011 01 13 12 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 310879 MEX 2011 01 11 15 40 00 1171-99 P co2 CCGG 389.960 0.070 ... L10 2011 01 26 13 31 00 18.9841 -97.3110 4469.00 4464.00 5.00 311500 MEX 2011 01 11 15 40 00 1172-99 P co2 CCGG 389.940 0.070 ... L10 2011 01 26 13 47 00 18.9841 -97.3110 4469.00 4464.00 5.00 311501 MEX 2011 01 21 17 00 00 2259-99 P co2 CCGG 391.490 0.070 ... L10 2011 02 11 14 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 312202 MEX 2011 01 21 17 00 00 2260-99 P co2 CCGG 391.350 0.070 ... L10 2011 02 11 14 41 00 18.9841 -97.3110 4469.00 4464.00 5.00 312203 MEX 2011 01 28 15 35 00 3301-99 P co2 CCGG 391.510 0.070 ... L10 2011 02 11 14 57 00 18.9841 -97.3110 4469.00 4464.00 5.00 312200 MEX 2011 01 28 15 35 00 3302-99 P co2 CCGG 391.520 0.070 ... L10 2011 02 11 15 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 312201 MEX 2011 02 02 15 45 00 2739-99 P co2 CCGG 391.260 0.070 ... L8 2011 03 02 15 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 313263 MEX 2011 02 02 15 45 00 2740-99 P co2 CCGG 391.450 0.070 ... L8 2011 03 02 16 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 313264 MEX 2011 02 10 15 35 00 3395-99 P co2 CCGG 390.770 0.070 ... L8 2011 03 02 16 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 313261 MEX 2011 02 10 15 35 00 3396-99 P co2 CCGG 390.820 0.070 ... L8 2011 03 02 16 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 313262 MEX 2011 02 21 16 00 00 1953-99 P co2 CCGG 391.290 0.070 ... L8 2011 03 15 13 27 00 18.9841 -97.3110 4469.00 4464.00 5.00 314070 MEX 2011 02 21 16 00 00 1954-99 P co2 CCGG 391.230 0.070 ... L8 2011 03 15 13 43 00 18.9841 -97.3110 4469.00 4464.00 5.00 314071 MEX 2011 02 28 16 45 00 3353-99 P co2 CCGG 392.440 0.070 ... L8 2011 03 15 12 57 00 18.9841 -97.3110 4469.00 4464.00 5.00 314068 MEX 2011 02 28 16 45 00 3354-99 P co2 CCGG 392.480 0.070 ... L8 2011 03 15 13 12 00 18.9841 -97.3110 4469.00 4464.00 5.00 314069 MEX 2011 03 10 14 50 00 4939-99 P co2 CCGG 393.480 0.070 ... L10 2011 04 01 13 59 00 18.9841 -97.3110 4469.00 4464.00 5.00 315121 MEX 2011 03 10 14 50 00 4940-99 P co2 CCGG 393.420 0.070 ... L10 2011 04 01 14 15 00 18.9841 -97.3110 4469.00 4464.00 5.00 315122 MEX 2011 03 21 14 45 00 2853-99 P co2 CCGG 392.170 0.070 ... L10 2011 04 01 14 31 00 18.9841 -97.3110 4469.00 4464.00 5.00 315123 MEX 2011 03 21 14 45 00 2854-99 P co2 CCGG 392.210 0.070 ... L10 2011 04 01 14 48 00 18.9841 -97.3110 4469.00 4464.00 5.00 315124 MEX 2011 03 26 15 00 00 5289-99 P co2 CCGG 393.290 0.070 ... L8 2011 04 08 13 43 00 18.9841 -97.3110 4469.00 4464.00 5.00 315506 MEX 2011 03 26 15 00 00 5290-99 P co2 CCGG 393.170 0.070 ... L8 2011 04 08 13 58 00 18.9841 -97.3110 4469.00 4464.00 5.00 315507 MEX 2011 04 01 16 00 00 519-99 P co2 CCGG 393.440 0.070 ... L8 2011 04 08 14 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 315508 MEX 2011 04 01 16 00 00 520-99 P co2 CCGG 393.320 0.070 ... L8 2011 04 08 14 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 315509 MEX 2011 04 11 14 45 00 4581-99 P co2 CCGG 392.760 0.070 ... L8 2011 05 04 10 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 317132 MEX 2011 04 11 14 45 00 4582-99 P co2 CCGG 392.790 0.070 ... L8 2011 05 04 11 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 317133 MEX 2011 04 21 14 40 00 5145-99 P co2 CCGG 393.010 0.070 ... L8 2011 05 04 11 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 317134 MEX 2011 04 21 14 40 00 5146-99 P co2 CCGG 393.010 0.070 ... L8 2011 05 04 11 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 317135 MEX 2011 04 30 15 00 00 4297-99 P co2 CCGG 396.000 0.070 ... L8 2011 06 01 14 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 318272 MEX 2011 04 30 15 00 00 4298-99 P co2 CCGG 395.860 0.070 ... L8 2011 06 01 14 35 00 18.9841 -97.3110 4469.00 4464.00 5.00 318273 MEX 2011 05 14 14 30 00 3217-99 P co2 CCGG 398.210 0.070 ... L8 2011 06 01 14 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 318274 MEX 2011 05 14 14 30 00 3218-99 P co2 CCGG 398.330 0.070 ... L8 2011 06 01 15 05 00 18.9841 -97.3110 4469.00 4464.00 5.00 318275 MEX 2011 05 21 16 30 00 1019-99 P co2 CCGG 394.380 0.070 ... L10 2011 06 06 12 59 00 18.9841 -97.3110 4469.00 4464.00 5.00 318585 MEX 2011 05 21 16 30 00 1020-99 P co2 CCGG 394.360 0.070 ... L10 2011 06 06 13 15 00 18.9841 -97.3110 4469.00 4464.00 5.00 318586 MEX 2011 05 28 14 50 00 2237-99 P co2 CCGG 395.060 0.070 ... L10 2011 06 06 12 26 00 18.9841 -97.3110 4469.00 4464.00 5.00 318587 MEX 2011 05 28 14 50 00 2238-99 P co2 CCGG 395.190 0.070 ... L10 2011 06 06 12 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 318588 MEX 2011 06 03 14 10 00 2975-99 P co2 CCGG 395.250 0.070 ... L8 2011 06 14 14 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 319158 MEX 2011 06 03 14 10 00 2976-99 P co2 CCGG 395.270 0.070 ... L8 2011 06 14 14 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 319159 MEX 2011 06 08 16 00 00 4701-99 P co2 CCGG 394.450 0.070 ... L8 2011 06 15 10 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 319156 MEX 2011 06 08 16 00 00 4702-99 P co2 CCGG 394.150 0.070 ... L8 2011 06 15 10 54 00 18.9841 -97.3110 4469.00 4464.00 5.00 319157 MEX 2011 06 18 16 15 00 3487-99 P co2 CCGG 393.320 0.070 ... L8 2011 07 07 10 55 00 18.9841 -97.3110 4469.00 4464.00 5.00 320024 MEX 2011 06 18 16 15 00 3488-99 P co2 CCGG 393.530 0.070 ... L8 2011 07 07 11 10 00 18.9841 -97.3110 4469.00 4464.00 5.00 320025 MEX 2011 06 25 16 15 00 5079-99 P co2 CCGG 391.680 0.070 ... L8 2011 07 01 12 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 320027 MEX 2011 06 25 16 15 00 5080-99 P co2 CCGG 391.590 0.070 ... L8 2011 07 01 13 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 320026 MEX 2011 07 08 16 30 00 2867-99 P co2 CCGG 391.900 0.070 ... L10 2011 08 10 15 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 321054 MEX 2011 07 08 16 30 00 2868-99 P co2 CCGG 391.640 0.070 ... L10 2011 08 10 16 09 00 18.9841 -97.3110 4469.00 4464.00 5.00 321055 MEX 2011 07 15 17 00 00 621-99 P co2 CCGG 391.450 0.070 ... L10 2011 08 10 15 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 321056 MEX 2011 07 15 17 00 00 622-99 P co2 CCGG 391.180 0.070 ... L10 2011 08 10 15 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 321057 MEX 2011 07 22 16 00 00 3575-99 P co2 CCGG 390.570 0.070 ... L10 2011 08 11 16 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 321977 MEX 2011 07 22 16 00 00 3576-99 P co2 CCGG 390.580 0.070 ... L10 2011 08 11 17 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 321978 MEX 2011 08 01 16 00 00 681-99 P co2 CCGG 391.150 0.070 ... L10 2011 08 11 16 18 00 18.9841 -97.3110 4469.00 4464.00 5.00 321975 MEX 2011 08 01 16 00 00 682-99 P co2 CCGG 391.100 0.070 ... L10 2011 08 11 16 34 00 18.9841 -97.3110 4469.00 4464.00 5.00 321976 MEX 2011 08 12 16 00 00 87-99 P co2 CCGG 385.880 0.070 ... L10 2011 08 26 12 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 322601 MEX 2011 08 12 16 00 00 88-99 P co2 CCGG 385.750 0.070 ... L10 2011 08 26 13 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 322602 MEX 2011 08 18 16 30 00 2771-99 P co2 CCGG 389.790 0.070 ... L10 2011 08 26 13 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 322599 MEX 2011 08 18 16 30 00 2772-99 P co2 CCGG 389.970 0.070 ... L10 2011 08 26 13 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 322600 MEX 2011 08 29 17 30 00 2439-99 P co2 CCGG 386.480 0.070 ... L8 2011 09 14 11 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 323335 MEX 2011 08 29 17 30 00 2440-99 P co2 CCGG 386.090 0.070 ... L8 2011 09 14 11 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 323336 MEX 2011 09 01 17 30 00 3713-99 P co2 CCGG 387.750 0.070 ... L8 2011 09 14 12 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 323333 MEX 2011 09 01 17 30 00 3714-99 P co2 CCGG 387.270 0.070 ... L8 2011 09 14 12 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 323334 MEX 2011 09 10 16 30 00 179-99 P co2 CCGG 385.980 0.070 -.. L8 2011 09 19 16 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 323807 MEX 2011 09 10 16 30 00 180-99 P co2 CCGG 386.680 0.070 +.. L8 2011 09 19 17 00 00 18.9841 -97.3110 4469.00 4464.00 5.00 323808 MEX 2011 09 15 18 20 00 4641-99 P co2 CCGG 386.840 0.070 +.. L8 2011 09 28 11 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 324181 MEX 2011 09 15 18 20 00 4642-99 P co2 CCGG 386.320 0.070 -.. L8 2011 09 28 11 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 324182 MEX 2011 09 19 17 10 00 1355-99 P co2 CCGG 383.620 0.070 ... L8 2011 09 28 10 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 324179 MEX 2011 09 19 17 10 00 1356-99 P co2 CCGG 383.890 0.070 ... L8 2011 09 28 10 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 324180 MEX 2011 10 01 16 30 00 3081-99 P co2 CCGG 386.820 0.070 ... L10 2011 10 20 14 16 00 18.9841 -97.3110 4469.00 4464.00 5.00 325274 MEX 2011 10 01 16 30 00 3082-99 P co2 CCGG 386.720 0.070 ... L10 2011 10 20 14 32 00 18.9841 -97.3110 4469.00 4464.00 5.00 325275 MEX 2011 10 11 16 30 00 2345-99 P co2 CCGG 386.750 0.070 ... L10 2011 10 20 13 43 00 18.9841 -97.3110 4469.00 4464.00 5.00 325277 MEX 2011 10 11 16 30 00 2346-99 P co2 CCGG 386.370 0.070 ... L10 2011 10 20 14 00 00 18.9841 -97.3110 4469.00 4464.00 5.00 325276 MEX 2011 10 18 15 30 00 2453-99 P co2 CCGG 389.080 0.070 ... L10 2011 11 04 16 34 00 18.9841 -97.3110 4469.00 4464.00 5.00 326180 MEX 2011 10 18 15 30 00 2454-99 P co2 CCGG 389.120 0.070 ... L10 2011 11 04 16 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 326181 MEX 2011 10 26 16 50 00 497-99 P co2 CCGG 388.210 0.070 ... L10 2011 11 04 16 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 326182 MEX 2011 10 26 16 50 00 498-99 P co2 CCGG 388.080 0.070 ... L10 2011 11 04 16 18 00 18.9841 -97.3110 4469.00 4464.00 5.00 326183 MEX 2011 11 08 16 00 00 245-99 P co2 CCGG 388.750 0.070 ... L8 2011 11 28 12 48 00 18.9841 -97.3110 4469.00 4464.00 5.00 326964 MEX 2011 11 08 16 00 00 246-99 P co2 CCGG 388.780 0.070 ... L8 2011 11 28 13 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 326965 MEX 2011 11 12 15 50 00 2953-99 P co2 CCGG 389.730 0.070 ... L8 2011 11 28 13 19 00 18.9841 -97.3110 4469.00 4464.00 5.00 326962 MEX 2011 11 12 15 50 00 2954-99 P co2 CCGG 389.780 0.070 ... L8 2011 11 28 13 34 00 18.9841 -97.3110 4469.00 4464.00 5.00 326963 MEX 2011 11 22 15 00 00 4145-99 P co2 CCGG 388.630 0.070 ... L10 2011 12 15 13 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 327758 MEX 2011 11 22 15 00 00 4146-99 P co2 CCGG 388.870 0.070 ... L10 2011 12 15 13 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 327759 MEX 2011 11 29 16 00 00 3985-99 P co2 CCGG 390.620 0.070 ... L10 2011 12 15 13 54 00 18.9841 -97.3110 4469.00 4464.00 5.00 327756 MEX 2011 11 29 16 00 00 3986-99 P co2 CCGG 390.720 0.070 ... L10 2011 12 15 14 11 00 18.9841 -97.3110 4469.00 4464.00 5.00 327757 MEX 2011 12 06 12 34 56 3305-99 P co2 CCGG 388.860 0.070 ... L8 2011 12 29 14 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 328235 MEX 2011 12 06 12 34 56 3306-99 P co2 CCGG 388.810 0.070 ... L8 2011 12 29 14 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 328236 MEX 2011 12 12 16 50 00 3291-99 P co2 CCGG 390.960 0.070 ... L8 2011 12 29 13 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 328237 MEX 2011 12 12 16 50 00 3292-99 P co2 CCGG 390.960 0.070 ... L8 2011 12 29 14 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 328238 MEX 2011 12 20 16 30 00 3775-99 P co2 CCGG 392.840 0.070 ... L8 2012 01 11 09 47 00 18.9841 -97.3110 4469.00 4464.00 5.00 329015 MEX 2011 12 20 16 30 00 3776-99 P co2 CCGG 392.790 0.070 ... L8 2012 01 11 10 02 00 18.9841 -97.3110 4469.00 4464.00 5.00 329016 MEX 2011 12 28 16 00 00 675-99 P co2 CCGG 393.210 0.070 ... L8 2012 01 11 10 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 329017 MEX 2011 12 28 16 00 00 676-99 P co2 CCGG 393.440 0.070 ... L8 2012 01 11 10 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 329018 MEX 2012 01 09 16 00 00 4311-99 P co2 CCGG 463.410 0.070 A.. L10 2012 02 06 13 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 330471 MEX 2012 01 09 16 00 00 4311-99 P co2 CCGG 391.950 0.070 ... L10 2012 02 07 09 43 00 18.9841 -97.3110 4469.00 4464.00 5.00 330471 MEX 2012 01 09 16 00 00 4312-99 P co2 CCGG 391.930 0.070 ... L10 2012 02 06 13 40 00 18.9841 -97.3110 4469.00 4464.00 5.00 330472 MEX 2012 01 25 16 50 00 3215-99 P co2 CCGG 392.260 0.070 ... L10 2012 02 06 12 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 330469 MEX 2012 01 25 16 50 00 3216-99 P co2 CCGG 467.040 0.070 A.. L10 2012 02 06 13 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 330470 MEX 2012 01 25 16 50 00 3216-99 P co2 CCGG 392.330 0.070 ... L10 2012 02 07 10 32 00 18.9841 -97.3110 4469.00 4464.00 5.00 330470 MEX 2012 02 24 16 30 00 2365-99 P co2 CCGG 393.750 0.070 ... L8 2012 03 12 13 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 332370 MEX 2012 02 24 16 30 00 2366-99 P co2 CCGG 394.240 0.070 ... L8 2012 03 12 13 40 00 18.9841 -97.3110 4469.00 4464.00 5.00 332371 MEX 2012 02 28 16 00 00 3687-99 P co2 CCGG 392.390 0.070 ... L8 2012 03 12 13 55 00 18.9841 -97.3110 4469.00 4464.00 5.00 332368 MEX 2012 02 28 16 00 00 3688-99 P co2 CCGG 392.250 0.070 ... L8 2012 03 12 14 11 00 18.9841 -97.3110 4469.00 4464.00 5.00 332369 MEX 2012 03 03 16 00 00 1319-99 P co2 CCGG 393.470 0.070 ... L8 2012 03 21 13 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 332830 MEX 2012 03 03 16 00 00 1320-99 P co2 CCGG 393.510 0.070 ... L8 2012 03 21 13 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 332831 MEX 2012 03 09 17 15 00 2923-99 P co2 CCGG 395.170 0.070 ... L8 2012 03 21 12 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 332832 MEX 2012 03 09 17 15 00 2924-99 P co2 CCGG 395.160 0.070 ... L8 2012 03 21 12 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 332833 MEX 2012 03 16 16 00 00 1263-99 P co2 CCGG 393.630 0.070 ... L8 2012 04 03 13 48 00 18.9841 -97.3110 4469.00 4464.00 5.00 333434 MEX 2012 03 16 16 00 00 1264-99 P co2 CCGG 393.590 0.070 ... L8 2012 04 03 14 03 00 18.9841 -97.3110 4469.00 4464.00 5.00 333435 MEX 2012 03 23 16 10 00 6017-66 P co2 CCGG 394.650 0.070 ... L8 2012 04 03 14 19 00 18.9841 -97.3110 4469.00 4464.00 5.00 333432 MEX 2012 03 23 16 10 00 6018-66 P co2 CCGG 394.350 0.070 ... L8 2012 04 03 14 34 00 18.9841 -97.3110 4469.00 4464.00 5.00 333433 MEX 2012 04 02 15 00 00 4987-99 P co2 CCGG 394.310 0.070 ... L8 2012 04 24 10 58 00 18.9841 -97.3110 4469.00 4464.00 5.00 334183 MEX 2012 04 02 15 00 00 4988-99 P co2 CCGG 394.340 0.070 ... L8 2012 04 24 11 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 334184 MEX 2012 04 09 15 15 00 173-99 P co2 CCGG 395.590 0.070 ... L8 2012 04 24 10 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 334181 MEX 2012 04 09 15 15 00 174-99 P co2 CCGG 395.800 0.070 ... L8 2012 04 24 10 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 334182 MEX 2012 04 13 16 00 00 1287-99 P co2 CCGG 395.400 0.070 ... L8 2012 05 07 15 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 334687 MEX 2012 04 13 16 00 00 1288-99 P co2 CCGG 395.290 0.070 ... L8 2012 05 07 16 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 334688 MEX 2012 04 23 16 00 00 2641-99 P co2 CCGG 396.580 0.070 ... L8 2012 05 07 16 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 334689 MEX 2012 04 23 16 00 00 2642-99 P co2 CCGG 396.510 0.070 ... L8 2012 05 07 16 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 334690 MEX 2012 04 27 16 00 00 39-99 P co2 CCGG 396.390 0.070 ... L8 2012 05 14 16 10 00 18.9841 -97.3110 4469.00 4464.00 5.00 335273 MEX 2012 04 27 16 00 00 40-99 P co2 CCGG 396.570 0.070 ... L8 2012 05 14 16 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 335274 MEX 2012 05 04 16 00 00 5111-99 P co2 CCGG 395.080 0.070 ... L10 2012 05 14 15 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 335271 MEX 2012 05 04 16 00 00 5112-99 P co2 CCGG 394.950 0.070 ... L10 2012 05 14 16 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 335272 MEX 2012 05 08 15 30 00 1481-99 P co2 CCGG 396.650 0.070 ... L8 2012 05 23 13 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 335822 MEX 2012 05 08 15 30 00 1482-99 P co2 CCGG 396.610 0.070 ... L8 2012 05 23 14 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 335823 MEX 2012 05 16 16 00 00 5201-99 P co2 CCGG 396.210 0.070 ... L8 2012 05 23 14 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 335820 MEX 2012 05 16 16 00 00 5202-99 P co2 CCGG 396.140 0.070 ... L8 2012 05 23 14 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 335821 MEX 2012 05 26 15 35 00 1049-99 P co2 CCGG 396.630 0.070 ... L8 2012 06 13 13 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 336857 MEX 2012 05 26 15 35 00 1050-99 P co2 CCGG 396.690 0.070 ... L8 2012 06 13 14 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 336858 MEX 2012 06 05 16 00 00 4505-99 P co2 CCGG 396.720 0.070 ... L8 2012 06 13 14 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 336855 MEX 2012 06 05 16 00 00 4506-99 P co2 CCGG 397.040 0.070 ... L8 2012 06 13 14 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 336856 MEX 2012 06 13 16 30 00 2105-99 P co2 CCGG 394.530 0.070 ... L8 2012 06 27 16 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 337473 MEX 2012 06 13 16 30 00 2106-99 P co2 CCGG 394.560 0.070 ... L8 2012 06 27 16 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 337474 MEX 2012 06 21 16 40 00 2193-99 P co2 CCGG 394.780 0.070 ... L8 2012 06 27 16 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 337471 MEX 2012 06 21 16 40 00 2194-99 P co2 CCGG 394.750 0.070 ... L8 2012 06 27 16 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 337472 MEX 2012 06 29 16 00 00 4973-99 P co2 CCGG 393.790 0.070 ... L8 2012 07 24 08 27 00 18.9841 -97.3110 4469.00 4464.00 5.00 338326 MEX 2012 06 29 16 00 00 4974-99 P co2 CCGG 393.580 0.070 ... L8 2012 07 24 08 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 338327 MEX 2012 07 05 16 30 00 5337-99 P co2 CCGG 393.350 0.070 ... L8 2012 07 24 08 58 00 18.9841 -97.3110 4469.00 4464.00 5.00 338328 MEX 2012 07 05 16 30 00 5338-99 P co2 CCGG 393.540 0.070 ... L8 2012 07 24 09 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 338329 MEX 2012 07 19 17 00 00 3125-99 P co2 CCGG 390.420 0.070 ... L8 2012 08 15 10 15 00 18.9841 -97.3110 4469.00 4464.00 5.00 339363 MEX 2012 07 19 17 00 00 3126-99 P co2 CCGG 390.280 0.070 ... L8 2012 08 15 10 31 00 18.9841 -97.3110 4469.00 4464.00 5.00 339364 MEX 2012 07 25 17 30 00 5163-99 P co2 CCGG 390.280 0.070 ... L8 2012 08 15 10 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 339366 MEX 2012 07 25 17 30 00 5164-99 P co2 CCGG 390.350 0.070 ... L8 2012 08 15 11 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 339365 MEX 2012 08 01 16 15 00 2577-99 P co2 CCGG 388.360 0.070 ... L8 2012 08 27 13 19 00 18.9841 -97.3110 4469.00 4464.00 5.00 339892 MEX 2012 08 01 16 15 00 2578-99 P co2 CCGG 388.810 0.070 ... L8 2012 08 27 13 35 00 18.9841 -97.3110 4469.00 4464.00 5.00 339893 MEX 2012 08 08 18 45 00 5375-99 P co2 CCGG 387.980 0.070 ... L8 2012 08 27 12 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 339890 MEX 2012 08 08 18 45 00 5376-99 P co2 CCGG 387.940 0.070 ... L8 2012 08 27 13 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 339891 MEX 2012 08 16 12 34 56 2429-99 P co2 CCGG 391.660 0.070 ... L8 2012 09 11 14 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 340572 MEX 2012 08 16 12 34 56 2430-99 P co2 CCGG 391.630 0.070 ... L8 2012 09 11 14 16 00 18.9841 -97.3110 4469.00 4464.00 5.00 340573 MEX 2012 08 24 16 00 00 675-99 P co2 CCGG 388.770 0.070 ... L8 2012 09 11 13 31 00 18.9841 -97.3110 4469.00 4464.00 5.00 340570 MEX 2012 08 24 16 00 00 676-99 P co2 CCGG 388.830 0.070 ... L8 2012 09 11 13 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 340571 MEX 2012 08 30 16 02 00 1101-99 P co2 CCGG 385.770 0.070 ... L8 2012 09 24 10 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 341134 MEX 2012 08 30 16 02 00 1102-99 P co2 CCGG 385.730 0.070 ... L8 2012 09 24 11 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 341135 MEX 2012 09 08 16 00 00 3275-99 P co2 CCGG 387.650 0.070 ... L8 2012 09 24 11 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 341132 MEX 2012 09 08 16 00 00 3276-99 P co2 CCGG 387.760 0.070 ... L8 2012 09 24 11 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 341133 MEX 2012 09 15 16 00 00 2273-99 P co2 CCGG 391.340 0.070 ... L8 2012 10 16 12 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 342298 MEX 2012 09 15 16 00 00 2274-99 P co2 CCGG 390.920 0.070 ... L8 2012 10 16 13 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 342299 MEX 2012 09 28 17 00 00 453-99 P co2 CCGG 389.430 0.070 ... L8 2012 10 16 13 16 00 18.9841 -97.3110 4469.00 4464.00 5.00 342296 MEX 2012 09 28 17 00 00 454-99 P co2 CCGG 389.280 0.070 ... L8 2012 10 16 13 31 00 18.9841 -97.3110 4469.00 4464.00 5.00 342297 MEX 2012 10 05 17 00 00 257-99 P co2 CCGG 388.650 0.070 ... L8 2012 10 30 11 00 00 18.9841 -97.3110 4469.00 4464.00 5.00 342971 MEX 2012 10 05 17 00 00 258-99 P co2 CCGG 388.220 0.070 ... L8 2012 10 30 11 16 00 18.9841 -97.3110 4469.00 4464.00 5.00 342972 MEX 2012 10 13 17 45 00 4827-99 P co2 CCGG 391.450 0.070 ... L8 2012 10 30 12 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 342973 MEX 2012 10 13 17 45 00 4828-99 P co2 CCGG 391.550 0.070 ... L8 2012 10 30 12 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 342974 MEX 2012 10 19 16 10 00 3947-99 P co2 CCGG 391.730 0.070 ... L8 2012 11 19 11 48 00 18.9841 -97.3110 4469.00 4464.00 5.00 343796 MEX 2012 10 19 16 10 00 3948-99 P co2 CCGG 391.360 0.070 ... L8 2012 11 19 12 03 00 18.9841 -97.3110 4469.00 4464.00 5.00 343797 MEX 2012 10 26 16 00 00 1947-99 P co2 CCGG 390.860 0.070 ... L8 2012 11 19 11 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 343794 MEX 2012 10 26 16 00 00 1948-99 P co2 CCGG 390.630 0.070 ... L8 2012 11 19 11 32 00 18.9841 -97.3110 4469.00 4464.00 5.00 343795 MEX 2012 11 01 15 50 00 2753-99 P co2 CCGG 390.790 0.070 ... L8 2012 11 27 10 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 344030 MEX 2012 11 01 15 50 00 2754-99 P co2 CCGG 390.520 0.070 ... L8 2012 11 27 11 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 344031 MEX 2012 11 12 16 30 00 3137-99 P co2 CCGG 391.820 0.070 ... L8 2012 11 27 10 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 344032 MEX 2012 11 12 16 30 00 3138-99 P co2 CCGG 391.720 0.070 ... L8 2012 11 27 10 35 00 18.9841 -97.3110 4469.00 4464.00 5.00 344033 MEX 2012 11 21 16 00 00 511-99 P co2 CCGG 391.740 0.070 ... L10 2012 12 18 14 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 344923 MEX 2012 11 21 16 00 00 512-99 P co2 CCGG 391.690 0.070 ... L10 2012 12 18 14 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 344924 MEX 2012 11 29 16 00 00 5331-99 P co2 CCGG 393.170 0.070 ... L8 2013 01 29 12 10 00 18.9841 -97.3110 4469.00 4464.00 5.00 346803 MEX 2012 11 29 16 00 00 5332-99 P co2 CCGG 393.150 0.070 ... L8 2013 01 29 12 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 346804 MEX 2012 12 04 16 30 00 2759-99 P co2 CCGG 392.980 0.070 ... L8 2013 01 09 11 41 00 18.9841 -97.3110 4469.00 4464.00 5.00 345333 MEX 2012 12 04 16 30 00 2760-99 P co2 CCGG 392.870 0.070 ... L8 2013 01 09 11 56 00 18.9841 -97.3110 4469.00 4464.00 5.00 345334 MEX 2012 12 10 16 00 00 885-99 P co2 CCGG 393.300 0.070 ... L8 2013 01 09 12 11 00 18.9841 -97.3110 4469.00 4464.00 5.00 345335 MEX 2012 12 10 16 00 00 886-99 P co2 CCGG 393.250 0.070 ... L8 2013 01 09 12 26 00 18.9841 -97.3110 4469.00 4464.00 5.00 345336 MEX 2012 12 18 16 00 00 3109-99 P co2 CCGG 392.800 0.070 ... L10 2013 01 11 11 05 00 18.9841 -97.3110 4469.00 4464.00 5.00 345686 MEX 2012 12 18 16 00 00 3110-99 P co2 CCGG 393.290 0.070 ... L10 2013 01 11 11 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 345687 MEX 2012 12 28 16 00 00 1903-99 P co2 CCGG 394.130 0.070 ... L8 2013 01 15 16 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 346087 MEX 2012 12 28 16 00 00 1904-99 P co2 CCGG 394.140 0.070 ... L8 2013 01 15 16 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 346088 MEX 2013 01 02 16 30 00 4297-99 P co2 CCGG 397.820 0.070 ... L8 2013 01 15 16 54 00 18.9841 -97.3110 4469.00 4464.00 5.00 346085 MEX 2013 01 02 16 30 00 4298-99 P co2 CCGG 397.620 0.070 ... L8 2013 01 15 17 09 00 18.9841 -97.3110 4469.00 4464.00 5.00 346086 MEX 2013 01 14 17 30 00 995-99 P co2 CCGG 393.590 0.070 ... L10 2013 01 29 12 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 346761 MEX 2013 01 14 17 30 00 996-99 P co2 CCGG 393.630 0.070 ... L10 2013 01 29 13 03 00 18.9841 -97.3110 4469.00 4464.00 5.00 346762 MEX 2013 01 18 17 40 00 6479-66 P co2 CCGG 397.440 0.070 ... L10 2013 01 29 12 14 00 18.9841 -97.3110 4469.00 4464.00 5.00 346759 MEX 2013 01 18 17 40 00 6480-66 P co2 CCGG 397.170 0.070 ... L10 2013 01 29 12 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 346760 MEX 2013 01 25 16 00 00 3203-99 P co2 CCGG 396.110 0.070 ... L8 2013 02 07 13 48 00 18.9841 -97.3110 4469.00 4464.00 5.00 347319 MEX 2013 01 25 16 00 00 3204-99 P co2 CCGG 395.770 0.070 ... L8 2013 02 07 14 03 00 18.9841 -97.3110 4469.00 4464.00 5.00 347320 MEX 2013 02 01 16 41 00 3261-99 P co2 CCGG 394.760 0.070 ... L8 2013 02 07 13 18 00 18.9841 -97.3110 4469.00 4464.00 5.00 347321 MEX 2013 02 01 16 41 00 3262-99 P co2 CCGG 394.720 0.070 ... L8 2013 02 07 13 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 347322 MEX 2013 02 12 17 00 00 217-99 P co2 CCGG 395.220 0.070 ... L10 2013 03 13 13 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 348535 MEX 2013 02 12 17 00 00 218-99 P co2 CCGG 395.190 0.070 ... L10 2013 03 13 13 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 348536 MEX 2013 02 21 17 15 00 3215-99 P co2 CCGG 395.720 0.070 ... L10 2013 03 13 12 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 348533 MEX 2013 02 21 17 15 00 3216-99 P co2 CCGG 395.670 0.070 ... L10 2013 03 13 12 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 348534 MEX 2013 03 07 15 00 00 2076-99 P co2 CCGG 396.940 0.070 ... L10 2013 03 25 12 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 348945 MEX 2013 03 07 15 00 00 837-99 P co2 CCGG 396.660 0.070 ... L10 2013 03 25 11 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 348944 MEX 2013 03 13 17 00 00 639-99 P co2 CCGG 400.340 0.070 N.. L10 2013 03 25 15 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 348934 MEX 2013 03 13 17 00 00 914-99 P co2 CCGG 400.270 0.070 N.. L10 2013 03 25 15 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 348935 MEX 2013 04 02 16 30 00 6345-66 P co2 CCGG 418.980 0.070 N.. L8 2013 04 22 12 10 00 18.9841 -97.3110 4469.00 4464.00 5.00 350383 MEX 2013 04 02 16 30 00 6346-66 P co2 CCGG 399.570 0.070 N.. L8 2013 04 22 12 26 00 18.9841 -97.3110 4469.00 4464.00 5.00 350384 MEX 2013 04 11 16 30 00 1339-99 P co2 CCGG 396.870 0.070 N.. L8 2013 04 19 16 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 350333 MEX 2013 04 11 16 30 00 1340-99 P co2 CCGG 396.990 0.070 N.. L8 2013 04 19 16 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 350334 MEX 2013 04 17 16 30 00 811-99 P co2 CCGG 399.190 0.070 N.. L8 2013 05 08 14 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 351033 MEX 2013 04 17 16 30 00 812-99 P co2 CCGG 399.100 0.070 N.. L8 2013 05 08 14 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 351034 MEX 2013 04 24 17 00 00 2715-99 P co2 CCGG 398.620 0.070 ... L8 2013 05 08 13 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 351031 MEX 2013 04 24 17 00 00 2716-99 P co2 CCGG 399.000 0.070 ... L8 2013 05 08 13 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 351032 MEX 2013 05 06 16 00 00 2049-99 P co2 CCGG 401.850 0.070 ... L10 2013 06 04 13 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 352352 MEX 2013 05 06 16 00 00 2050-99 P co2 CCGG 401.800 0.070 ... L10 2013 06 04 13 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 352353 MEX 2013 05 20 17 30 00 2047-99 P co2 CCGG 401.250 0.070 ... L10 2013 06 04 12 57 00 18.9841 -97.3110 4469.00 4464.00 5.00 352350 MEX 2013 05 20 17 30 00 2048-99 P co2 CCGG 401.230 0.070 N.. L10 2013 06 04 13 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 352351 MEX 2013 05 24 17 15 00 3761-99 P co2 CCGG 399.020 0.070 ... L10 2013 06 10 14 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 352917 MEX 2013 05 24 17 15 00 3762-99 P co2 CCGG 398.970 0.070 ... L10 2013 06 10 14 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 352918 MEX 2013 05 30 16 30 00 175-99 P co2 CCGG 399.360 0.070 ... L10 2013 06 10 14 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 352915 MEX 2013 05 30 16 30 00 176-99 P co2 CCGG 399.360 0.070 ... L10 2013 06 10 14 55 00 18.9841 -97.3110 4469.00 4464.00 5.00 352916 MEX 2013 06 10 16 00 00 3116-99 P co2 CCGG 397.890 0.070 N.. L10 2013 07 02 15 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 353796 MEX 2013 06 10 16 00 00 4687-99 P co2 CCGG 397.790 0.070 ... L10 2013 07 02 14 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 353795 MEX 2013 06 19 16 00 00 2767-99 P co2 CCGG 398.540 0.070 ... L10 2013 07 02 14 34 00 18.9841 -97.3110 4469.00 4464.00 5.00 353794 MEX 2013 06 19 16 00 00 428-99 P co2 CCGG 398.430 0.070 ... L10 2013 07 02 14 18 00 18.9841 -97.3110 4469.00 4464.00 5.00 353793 MEX 2013 06 29 17 00 00 4195-99 P co2 CCGG 395.910 0.070 ... L8 2013 08 01 12 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 355057 MEX 2013 06 29 17 00 00 4196-99 P co2 CCGG 396.250 0.070 ... L8 2013 08 01 13 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 355058 MEX 2013 07 09 17 00 00 4209-99 P co2 CCGG 392.990 0.070 ... L8 2013 08 01 12 19 00 18.9841 -97.3110 4469.00 4464.00 5.00 355055 MEX 2013 07 09 17 00 00 5197-99 P co2 CCGG 393.130 0.070 ... L8 2013 08 01 12 35 00 18.9841 -97.3110 4469.00 4464.00 5.00 355056 MEX 2013 07 15 16 00 00 4845-99 P co2 CCGG 395.690 0.070 ... L8 2013 08 08 12 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 355450 MEX 2013 07 15 16 00 00 4846-99 P co2 CCGG 395.340 0.070 ... L8 2013 08 08 12 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 355451 MEX 2013 07 23 17 30 00 1287-99 P co2 CCGG 395.430 0.070 ... L8 2013 08 08 12 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 355452 MEX 2013 07 23 17 30 00 1288-99 P co2 CCGG 395.210 0.070 ... L8 2013 08 08 12 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 355453 MEX 2013 07 30 17 00 00 371-99 P co2 CCGG 394.770 0.070 ... L8 2013 08 19 15 48 00 18.9841 -97.3110 4469.00 4464.00 5.00 356032 MEX 2013 07 30 17 00 00 372-99 P co2 CCGG 394.700 0.070 ... L8 2013 08 19 16 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 356033 MEX 2013 08 05 16 00 00 5081-99 P co2 CCGG 394.990 0.070 ... L8 2013 08 19 16 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 356034 MEX 2013 08 05 16 00 00 5082-99 P co2 CCGG 395.070 0.070 ... L8 2013 08 19 16 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 356035 MEX 2013 08 14 16 00 00 287-99 P co2 CCGG 393.970 0.070 ... L8 2013 09 26 12 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 356975 MEX 2013 08 14 16 00 00 4552-99 P co2 CCGG 393.650 0.070 ... L8 2013 09 26 12 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 356976 MEX 2013 08 21 16 32 00 4074-99 P co2 CCGG 393.920 0.070 ... L10 2013 09 26 12 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 356978 MEX 2013 08 21 16 32 00 527-99 P co2 CCGG 394.000 0.070 ... L10 2013 09 26 12 32 00 18.9841 -97.3110 4469.00 4464.00 5.00 356977 MEX 2013 09 03 16 30 00 343-99 P co2 CCGG 392.100 0.070 ... L10 2013 10 23 11 09 00 18.9841 -97.3110 4469.00 4464.00 5.00 357846 MEX 2013 09 03 16 30 00 344-99 P co2 CCGG 392.090 0.070 N.. L10 2013 10 23 11 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 357847 MEX 2013 09 11 16 00 00 2153-99 P co2 CCGG 393.270 0.070 ... L8 2013 10 23 12 18 00 18.9841 -97.3110 4469.00 4464.00 5.00 357856 MEX 2013 09 11 16 00 00 2154-99 P co2 CCGG 393.130 0.070 ... L8 2013 10 23 12 34 00 18.9841 -97.3110 4469.00 4464.00 5.00 357857 MEX 2013 09 20 16 15 00 749-99 P co2 CCGG 390.610 0.070 N.. L8 2013 10 29 10 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 358363 MEX 2013 09 20 16 15 00 750-99 P co2 CCGG 390.610 0.070 N.. L8 2013 10 29 11 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 358364 MEX 2013 09 25 16 00 00 1083-99 P co2 CCGG 394.210 0.070 ... L10 2013 10 29 12 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 358361 MEX 2013 09 25 16 00 00 1084-99 P co2 CCGG 394.230 0.070 ... L10 2013 10 29 13 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 358362 MEX 2013 10 04 15 30 00 4221-99 P co2 CCGG 391.850 0.070 ... L10 2013 11 07 09 16 00 18.9841 -97.3110 4469.00 4464.00 5.00 359262 MEX 2013 10 04 15 30 00 4222-99 P co2 CCGG 391.480 0.070 ... L10 2013 11 07 09 32 00 18.9841 -97.3110 4469.00 4464.00 5.00 359263 MEX 2013 10 17 16 00 00 2915-99 P co2 CCGG 389.520 0.070 ... L10 2013 11 07 10 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 359264 MEX 2013 10 17 16 00 00 2916-99 P co2 CCGG 389.680 0.070 ... L10 2013 11 07 10 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 359265 MEX 2013 10 23 16 00 00 2529-99 P co2 CCGG 397.470 0.070 .X. L8 2013 11 21 11 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 360214 MEX 2013 10 23 16 00 00 4843-99 P co2 CCGG 397.380 0.070 .X. L8 2013 11 21 11 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 360215 MEX 2013 11 11 15 50 00 1807-99 P co2 CCGG 393.940 0.070 ... L8 2013 11 21 10 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 360216 MEX 2013 11 11 15 50 00 2581-99 P co2 CCGG 394.080 0.070 ... L8 2013 11 21 11 05 00 18.9841 -97.3110 4469.00 4464.00 5.00 360217 MEX 2013 11 23 16 25 00 3537-99 P co2 CCGG 395.390 0.070 ... L10 2013 12 16 10 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 361401 MEX 2013 11 23 16 25 00 3538-99 P co2 CCGG 395.670 0.070 ... L10 2013 12 16 10 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 361402 MEX 2013 11 28 15 30 00 3379-99 P co2 CCGG 395.410 0.070 ... L10 2013 12 16 09 57 00 18.9841 -97.3110 4469.00 4464.00 5.00 361403 MEX 2013 11 28 15 30 00 3380-99 P co2 CCGG 395.430 0.070 ... L10 2013 12 16 10 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 361404 MEX 2013 12 05 15 30 00 681-99 P co2 CCGG 395.020 0.070 ... L10 2013 12 20 12 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 361905 MEX 2013 12 05 15 30 00 682-99 P co2 CCGG 395.230 0.070 ... L10 2013 12 20 12 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 361906 MEX 2013 12 14 15 30 00 1859-99 P co2 CCGG 396.970 0.070 ... L10 2013 12 20 13 05 00 18.9841 -97.3110 4469.00 4464.00 5.00 361907 MEX 2013 12 14 15 30 00 1860-99 P co2 CCGG 397.370 0.070 ... L10 2013 12 20 13 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 361908 MEX 2013 12 19 15 30 00 3119-99 P co2 CCGG 396.450 0.070 ... L8 2014 01 08 15 56 00 18.9841 -97.3110 4469.00 4464.00 5.00 362286 MEX 2013 12 19 15 30 00 3120-99 P co2 CCGG 396.300 0.070 ... L8 2014 01 08 16 12 00 18.9841 -97.3110 4469.00 4464.00 5.00 362287 MEX 2013 12 28 15 45 00 2149-99 P co2 CCGG 396.900 0.070 N.. L8 2014 01 08 15 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 362284 MEX 2013 12 28 15 45 00 2150-99 P co2 CCGG 396.830 0.070 N.. L8 2014 01 08 15 40 00 18.9841 -97.3110 4469.00 4464.00 5.00 362285 MEX 2014 01 11 16 00 00 4575-99 P co2 CCGG 397.360 0.070 ... L10 2014 02 06 11 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 363141 MEX 2014 01 11 16 00 00 4576-99 P co2 CCGG 397.490 0.070 ... L10 2014 02 06 11 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 363142 MEX 2014 01 16 16 00 00 3419-99 P co2 CCGG 398.080 0.070 ... L10 2014 02 06 10 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 363143 MEX 2014 01 16 16 00 00 3420-99 P co2 CCGG 397.890 0.070 ... L10 2014 02 06 10 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 363144 MEX 2014 01 23 15 00 00 3855-99 P co2 CCGG 397.080 0.070 ... L10 2014 02 19 11 03 00 18.9841 -97.3110 4469.00 4464.00 5.00 363918 MEX 2014 01 23 15 00 00 3856-99 P co2 CCGG 397.120 0.070 ... L10 2014 02 19 11 19 00 18.9841 -97.3110 4469.00 4464.00 5.00 363917 MEX 2014 01 31 15 30 00 1059-99 P co2 CCGG 398.430 0.070 N.. L10 2014 02 19 11 35 00 18.9841 -97.3110 4469.00 4464.00 5.00 363919 MEX 2014 01 31 15 30 00 1060-99 P co2 CCGG 398.400 0.070 N.. L10 2014 02 19 11 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 363920 MEX 2014 02 08 15 00 00 3515-99 P co2 CCGG 397.600 0.070 ... L10 2014 02 25 12 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 364430 MEX 2014 02 08 15 00 00 3516-99 P co2 CCGG 397.470 0.070 ... L10 2014 02 25 12 58 00 18.9841 -97.3110 4469.00 4464.00 5.00 364431 MEX 2014 02 13 15 30 00 5253-99 P co2 CCGG 397.980 0.070 ... L10 2014 02 25 13 47 00 18.9841 -97.3110 4469.00 4464.00 5.00 364432 MEX 2014 02 13 15 30 00 5254-99 P co2 CCGG 398.000 0.070 ... L10 2014 02 25 14 03 00 18.9841 -97.3110 4469.00 4464.00 5.00 364433 MEX 2014 02 21 15 30 00 3295-99 P co2 CCGG 397.680 0.070 ... L8 2014 03 10 14 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 365142 MEX 2014 02 21 15 30 00 4193-99 P co2 CCGG 397.800 0.070 ... L8 2014 03 10 14 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 365143 MEX 2014 02 28 15 30 00 2481-99 P co2 CCGG 397.710 0.070 ... L8 2014 03 10 13 48 00 18.9841 -97.3110 4469.00 4464.00 5.00 365140 MEX 2014 02 28 15 30 00 5350-99 P co2 CCGG 397.700 0.070 ... L8 2014 03 10 14 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 365141 MEX 2014 03 06 15 00 00 1539-99 P co2 CCGG 399.010 0.070 ... L8 2014 04 08 15 03 00 18.9841 -97.3110 4469.00 4464.00 5.00 366228 MEX 2014 03 06 15 00 00 1540-99 P co2 CCGG 398.930 0.070 ... L8 2014 04 08 15 19 00 18.9841 -97.3110 4469.00 4464.00 5.00 366229 MEX 2014 03 14 15 00 00 4107-99 P co2 CCGG 399.540 0.070 ... L8 2014 04 08 15 35 00 18.9841 -97.3110 4469.00 4464.00 5.00 366226 MEX 2014 03 14 15 00 00 4108-99 P co2 CCGG 399.390 0.070 ... L8 2014 04 08 15 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 366227 MEX 2014 03 18 15 00 00 3829-99 P co2 CCGG 397.790 0.070 ... L8 2014 04 09 09 41 00 18.9841 -97.3110 4469.00 4464.00 5.00 366214 MEX 2014 03 18 15 00 00 3830-99 P co2 CCGG 397.800 0.070 ... L8 2014 04 09 09 57 00 18.9841 -97.3110 4469.00 4464.00 5.00 366215 MEX 2014 03 28 15 30 00 4945-99 P co2 CCGG 397.740 0.070 ... L8 2014 04 08 16 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 366216 MEX 2014 03 28 15 30 00 4946-99 P co2 CCGG 397.720 0.070 ... L8 2014 04 08 16 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 366217 MEX 2014 04 04 15 30 00 4169-99 P co2 CCGG 400.090 0.070 ... L8 2014 04 21 14 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 366784 MEX 2014 04 04 15 30 00 4170-99 P co2 CCGG 399.880 0.070 ... L8 2014 04 21 14 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 366785 MEX 2014 04 14 15 00 00 1947-99 P co2 CCGG 401.960 0.070 ... L8 2014 04 21 13 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 366786 MEX 2014 04 14 15 00 00 1948-99 P co2 CCGG 402.000 0.070 ... L8 2014 04 21 13 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 366787 MEX 2014 04 22 15 00 00 2536-99 P co2 CCGG 398.930 0.070 ... L8 2014 06 06 17 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 368506 MEX 2014 04 22 15 00 00 3172-99 P co2 CCGG 398.840 0.070 ... L8 2014 06 06 17 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 368507 MEX 2014 04 29 15 17 00 3049-99 P co2 CCGG 402.280 0.070 ... L8 2014 06 06 16 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 368504 MEX 2014 04 29 15 17 00 4015-99 P co2 CCGG 402.300 0.070 ... L8 2014 06 06 16 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 368505 MEX 2014 05 06 15 00 00 173-99 P co2 CCGG 402.170 0.070 ... L8 2014 06 06 11 41 00 18.9841 -97.3110 4469.00 4464.00 5.00 368518 MEX 2014 05 06 15 00 00 3346-99 P co2 CCGG 402.150 0.070 ... L8 2014 06 06 11 57 00 18.9841 -97.3110 4469.00 4464.00 5.00 368519 MEX 2014 05 16 15 30 00 3051-99 P co2 CCGG 401.290 0.070 ... L8 2014 06 06 11 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 368516 MEX 2014 05 16 15 30 00 6002-66 P co2 CCGG 401.450 0.070 ... L8 2014 06 06 11 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 368517 MEX 2014 05 21 15 00 00 5066-99 P co2 CCGG 402.830 0.070 ... L8 2014 07 02 17 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 369763 MEX 2014 05 21 15 00 00 78-99 P co2 CCGG 402.830 0.070 ... L8 2014 07 02 17 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 369764 MEX 2014 05 28 15 00 00 1711-99 P co2 CCGG 402.470 0.070 ... L8 2014 07 02 16 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 369765 MEX 2014 05 28 15 00 00 4929-99 P co2 CCGG 402.460 0.070 ... L8 2014 07 02 17 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 369766 MEX 2014 06 10 12 34 56 1879-99 P co2 CCGG 400.080 0.070 ... L8 2014 07 02 16 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 369760 MEX 2014 06 10 12 34 56 4474-99 P co2 CCGG 400.200 0.070 ... L8 2014 07 02 16 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 369759 MEX 2014 06 13 15 00 00 1435-99 P co2 CCGG 399.790 0.070 ... L8 2014 07 02 15 41 00 18.9841 -97.3110 4469.00 4464.00 5.00 369761 MEX 2014 06 13 15 00 00 2349-99 P co2 CCGG 399.960 0.070 ... L8 2014 07 02 15 57 00 18.9841 -97.3110 4469.00 4464.00 5.00 369762 MEX 2014 06 19 15 00 00 3877-99 P co2 CCGG 399.090 0.070 ... L8 2014 07 28 15 44 00 18.9841 -97.3110 4469.00 4464.00 5.00 371090 MEX 2014 06 19 15 00 00 4683-99 P co2 CCGG 399.260 0.070 ... L8 2014 07 28 16 00 00 18.9841 -97.3110 4469.00 4464.00 5.00 371091 MEX 2014 06 26 15 00 00 6594-66 P co2 CCGG 397.960 0.070 ... L8 2014 07 29 08 44 00 18.9841 -97.3110 4469.00 4464.00 5.00 371088 MEX 2014 06 26 15 00 00 6761-66 P co2 CCGG 397.910 0.070 ... L8 2014 07 29 09 00 00 18.9841 -97.3110 4469.00 4464.00 5.00 371089 MEX 2014 07 07 15 00 00 1038-99 P co2 CCGG 398.220 0.070 ... L8 2014 08 13 13 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 371997 MEX 2014 07 07 15 00 00 1664-99 P co2 CCGG 398.200 0.070 ... L8 2014 08 13 13 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 371998 MEX 2014 07 11 15 00 00 3108-99 P co2 CCGG 398.220 0.070 ... L8 2014 08 13 14 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 371999 MEX 2014 07 11 15 00 00 6196-66 P co2 CCGG 398.310 0.070 ... L8 2014 08 13 14 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 372000 MEX 2014 07 23 15 00 00 5027-99 P co2 CCGG 397.800 0.070 ... L8 2014 08 12 10 44 00 18.9841 -97.3110 4469.00 4464.00 5.00 371647 MEX 2014 07 23 15 00 00 5028-99 P co2 CCGG 397.900 0.070 ... L8 2014 08 12 11 00 00 18.9841 -97.3110 4469.00 4464.00 5.00 371648 MEX 2014 07 28 15 00 00 467-99 P co2 CCGG 397.200 0.070 ... L8 2014 08 11 12 02 00 18.9841 -97.3110 4469.00 4464.00 5.00 371633 MEX 2014 07 28 15 00 00 468-99 P co2 CCGG 397.160 0.070 ... L8 2014 08 11 12 18 00 18.9841 -97.3110 4469.00 4464.00 5.00 371634 MEX 2014 08 06 15 00 00 1407-99 P co2 CCGG 397.060 0.070 ... L8 2014 09 04 11 14 00 18.9841 -97.3110 4469.00 4464.00 5.00 373378 MEX 2014 08 06 15 00 00 3266-99 P co2 CCGG 397.020 0.070 ... L8 2014 09 04 11 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 373379 MEX 2014 08 25 15 00 00 1841-99 P co2 CCGG 394.800 0.070 +.. L8 2014 09 04 10 58 00 18.9841 -97.3110 4469.00 4464.00 5.00 373381 MEX 2014 08 25 15 00 00 713-99 P co2 CCGG 394.290 0.070 -.. L8 2014 09 04 10 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 373380 MEX 2014 09 01 15 00 00 3033-99 P co2 CCGG 396.090 0.070 ... L8 2014 10 03 14 31 00 18.9841 -97.3110 4469.00 4464.00 5.00 374860 MEX 2014 09 01 15 00 00 3034-99 P co2 CCGG 395.920 0.070 ... L8 2014 10 03 14 47 00 18.9841 -97.3110 4469.00 4464.00 5.00 374861 MEX 2014 09 05 15 00 00 4097-99 P co2 CCGG 394.600 0.070 ... L8 2014 10 03 15 03 00 18.9841 -97.3110 4469.00 4464.00 5.00 374862 MEX 2014 09 05 15 00 00 4098-99 P co2 CCGG 394.820 0.070 ... L8 2014 10 03 15 19 00 18.9841 -97.3110 4469.00 4464.00 5.00 374863 MEX 2014 09 13 15 00 00 179-99 P co2 CCGG 394.320 0.070 ... L8 2014 10 01 11 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 374692 MEX 2014 09 13 15 00 00 3289-99 P co2 CCGG 394.290 0.070 ... L8 2014 10 01 11 58 00 18.9841 -97.3110 4469.00 4464.00 5.00 374693 MEX 2014 09 24 15 25 00 286-99 P co2 CCGG 393.310 0.070 ... L8 2014 10 01 12 14 00 18.9841 -97.3110 4469.00 4464.00 5.00 374690 MEX 2014 09 24 15 25 00 4943-99 P co2 CCGG 393.460 0.070 ... L8 2014 10 01 12 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 374691 MEX 2014 10 04 15 30 00 4785-99 P co2 CCGG 394.240 0.070 ... L8 2014 11 13 11 35 00 18.9841 -97.3110 4469.00 4464.00 5.00 376928 MEX 2014 10 04 15 30 00 4786-99 P co2 CCGG 393.780 0.070 ... L8 2014 11 13 11 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 376929 MEX 2014 10 10 15 00 00 5369-99 P co2 CCGG 392.740 0.070 ... L8 2014 11 13 12 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 376932 MEX 2014 10 10 15 00 00 5370-99 P co2 CCGG 392.950 0.070 ... L8 2014 11 13 12 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 376933 MEX 2014 10 22 15 00 00 151-99 P co2 CCGG 395.330 0.070 ... L8 2014 11 13 12 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 376934 MEX 2014 10 22 15 00 00 1805-99 P co2 CCGG 395.270 0.070 ... L8 2014 11 13 12 55 00 18.9841 -97.3110 4469.00 4464.00 5.00 376935 MEX 2014 10 29 16 00 00 4657-99 P co2 CCGG 395.350 0.070 ... L8 2014 11 13 13 11 00 18.9841 -97.3110 4469.00 4464.00 5.00 376930 MEX 2014 10 29 16 00 00 4750-99 P co2 CCGG 395.270 0.070 ... L8 2014 11 13 13 27 00 18.9841 -97.3110 4469.00 4464.00 5.00 376931 MEX 2014 11 06 15 00 00 2531-99 P co2 CCGG 395.830 0.070 ... L8 2014 12 05 12 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 377884 MEX 2014 11 06 15 00 00 289-99 P co2 CCGG 395.820 0.070 ... L8 2014 12 05 12 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 377883 MEX 2014 11 13 15 00 00 4221-99 P co2 CCGG 396.450 0.070 ... L8 2014 12 05 11 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 377885 MEX 2014 11 13 15 00 00 5144-99 P co2 CCGG 396.400 0.070 ... L8 2014 12 05 11 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 377886 MEX 2015 01 14 17 00 00 3761-99 P co2 CCGG 398.340 0.070 ... L8 2015 03 18 10 56 00 18.9841 -97.3110 4469.00 4464.00 5.00 382500 MEX 2015 01 14 17 00 00 3762-99 P co2 CCGG 398.260 0.070 ... L8 2015 03 18 11 12 00 18.9841 -97.3110 4469.00 4464.00 5.00 382501 MEX 2015 01 26 17 00 00 3797-99 P co2 CCGG 398.520 0.070 ... L8 2015 03 18 12 00 00 18.9841 -97.3110 4469.00 4464.00 5.00 382498 MEX 2015 01 26 17 00 00 3798-99 P co2 CCGG 398.820 0.070 ... L8 2015 03 18 12 16 00 18.9841 -97.3110 4469.00 4464.00 5.00 382499 MEX 2015 02 16 16 30 00 389-99 P co2 CCGG 399.270 0.070 ... L8 2015 04 07 14 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 383951 MEX 2015 02 16 16 30 00 390-99 P co2 CCGG 399.240 0.070 ... L8 2015 04 07 14 54 00 18.9841 -97.3110 4469.00 4464.00 5.00 383952 MEX 2015 02 25 15 30 00 1349-99 P co2 CCGG 400.190 0.070 ... L8 2015 04 07 14 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 383949 MEX 2015 02 25 15 30 00 1350-99 P co2 CCGG 400.050 0.070 ... L8 2015 04 07 14 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 383950 MEX 2015 03 04 16 27 00 3617-99 P co2 CCGG 401.120 0.070 ... L8 2015 04 29 12 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 385338 MEX 2015 03 04 16 27 00 3618-99 P co2 CCGG 401.120 0.070 ... L8 2015 04 29 13 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 385339 MEX 2015 03 11 15 35 00 91-99 P co2 CCGG 400.310 0.070 ... L8 2015 04 27 17 05 00 18.9841 -97.3110 4469.00 4464.00 5.00 385069 MEX 2015 03 11 15 35 00 92-99 P co2 CCGG 400.360 0.070 ... L8 2015 04 27 17 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 385070 MEX 2015 03 18 16 00 00 4879-99 P co2 CCGG 401.850 0.070 ... L8 2015 04 30 13 11 00 18.9841 -97.3110 4469.00 4464.00 5.00 385310 MEX 2015 03 18 16 00 00 4880-99 P co2 CCGG 401.830 0.070 ... L8 2015 04 30 13 27 00 18.9841 -97.3110 4469.00 4464.00 5.00 385311 MEX 2015 03 27 16 00 00 1801-99 P co2 CCGG 403.010 0.070 ... L8 2015 04 30 12 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 385312 MEX 2015 03 27 16 00 00 1802-99 P co2 CCGG 402.960 0.070 ... L8 2015 04 30 12 19 00 18.9841 -97.3110 4469.00 4464.00 5.00 385313 MEX 2015 04 08 16 00 00 911-99 P co2 CCGG 400.310 0.070 ... L8 2015 05 28 09 40 00 18.9841 -97.3110 4469.00 4464.00 5.00 386593 MEX 2015 04 08 16 00 00 912-99 P co2 CCGG 400.340 0.070 ... L8 2015 05 28 09 56 00 18.9841 -97.3110 4469.00 4464.00 5.00 386594 MEX 2015 04 16 15 30 00 465-99 P co2 CCGG 401.960 0.070 ... L8 2015 05 28 10 11 00 18.9841 -97.3110 4469.00 4464.00 5.00 386595 MEX 2015 04 16 15 30 00 466-99 P co2 CCGG 401.990 0.070 ... L8 2015 05 28 10 27 00 18.9841 -97.3110 4469.00 4464.00 5.00 386596 MEX 2015 04 21 15 00 00 3495-99 P co2 CCGG 401.630 0.070 ... L8 2015 05 27 11 54 00 18.9841 -97.3110 4469.00 4464.00 5.00 386525 MEX 2015 04 21 15 00 00 3596-99 P co2 CCGG 401.640 0.070 ... L8 2015 05 27 12 10 00 18.9841 -97.3110 4469.00 4464.00 5.00 386526 MEX 2015 04 27 15 00 00 3984-99 P co2 CCGG 401.090 0.070 ... L8 2015 05 27 12 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 386527 MEX 2015 04 27 15 00 00 4251-99 P co2 CCGG 401.070 0.070 ... L8 2015 05 27 12 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 386528 MEX 2015 05 07 15 30 00 1601-99 P co2 CCGG 402.680 0.070 ... L8 2015 07 23 15 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 389972 MEX 2015 05 07 15 30 00 3057-99 P co2 CCGG 402.380 0.070 ... L8 2015 07 23 16 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 389973 MEX 2015 05 14 15 30 00 2422-99 P co2 CCGG 402.440 0.070 ... L8 2015 07 23 15 14 00 18.9841 -97.3110 4469.00 4464.00 5.00 389970 MEX 2015 05 14 15 30 00 2882-99 P co2 CCGG 402.430 0.070 ... L8 2015 07 23 15 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 389971 MEX 2015 06 13 15 20 00 1966-99 P co2 CCGG 402.250 0.070 ... L8 2015 08 05 10 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 390496 MEX 2015 06 13 15 20 00 3786-99 P co2 CCGG 402.310 0.070 ... L8 2015 08 05 10 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 390497 MEX 2015 06 18 15 00 00 1422-99 P co2 CCGG 401.870 0.070 +.. L8 2015 08 04 16 32 00 18.9841 -97.3110 4469.00 4464.00 5.00 390498 MEX 2015 06 18 15 00 00 3058-99 P co2 CCGG 401.190 0.070 -.. L8 2015 08 04 16 48 00 18.9841 -97.3110 4469.00 4464.00 5.00 390499 MEX 2015 06 26 15 00 00 2796-99 P co2 CCGG 400.970 0.070 ... L8 2015 08 04 15 44 00 18.9841 -97.3110 4469.00 4464.00 5.00 390495 MEX 2015 06 26 15 00 00 744-99 P co2 CCGG 401.000 0.070 ... L8 2015 08 04 15 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 390494 MEX 2015 07 03 15 00 00 1371-99 P co2 CCGG 400.980 0.070 ... L8 2015 08 04 16 00 00 18.9841 -97.3110 4469.00 4464.00 5.00 390493 MEX 2015 07 03 15 00 00 376-99 P co2 CCGG 401.040 0.070 ... L8 2015 08 04 16 16 00 18.9841 -97.3110 4469.00 4464.00 5.00 390492 MEX 2015 07 17 15 30 00 4185-99 P co2 CCGG 398.130 0.070 ... L8 2015 09 09 15 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 393058 MEX 2015 07 17 15 30 00 4186-99 P co2 CCGG 398.310 0.070 ... L8 2015 09 09 15 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 393059 MEX 2015 07 31 15 00 00 1803-99 P co2 CCGG 399.560 0.070 ... L8 2015 09 09 15 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 393060 MEX 2015 07 31 15 00 00 1804-99 P co2 CCGG 399.640 0.070 ... L8 2015 09 09 16 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 393061 MEX 2015 08 24 15 00 00 2651-99 P co2 CCGG 397.960 0.070 ... L8 2015 09 22 14 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 393933 MEX 2015 08 24 15 00 00 2652-99 P co2 CCGG 397.630 0.070 ... L8 2015 09 22 15 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 393934 MEX 2015 09 01 15 00 00 4297-99 P co2 CCGG 397.130 0.070 ... L8 2015 09 22 15 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 393935 MEX 2015 09 01 15 00 00 4298-99 P co2 CCGG 397.230 0.070 ... L8 2015 09 22 15 41 00 18.9841 -97.3110 4469.00 4464.00 5.00 393936 MEX 2015 09 09 15 00 00 5055-99 P co2 CCGG 397.930 0.070 ... L8 2015 10 29 10 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 396533 MEX 2015 09 09 15 00 00 5056-99 P co2 CCGG 397.770 0.070 ... L8 2015 10 29 10 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 396534 MEX 2015 09 18 15 00 00 1661-99 P co2 CCGG 397.100 0.070 ... L8 2015 10 29 09 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 396537 MEX 2015 09 18 15 00 00 1662-99 P co2 CCGG 397.070 0.070 ... L8 2015 10 29 10 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 396538 MEX 2015 09 24 15 00 00 4193-99 P co2 CCGG 396.720 0.070 ... L8 2015 10 29 11 10 00 18.9841 -97.3110 4469.00 4464.00 5.00 396536 MEX 2015 09 24 15 00 00 989-99 P co2 CCGG 397.010 0.070 N.. L8 2015 10 29 10 54 00 18.9841 -97.3110 4469.00 4464.00 5.00 396535 MEX 2015 10 05 17 00 00 1386-99 P co2 CCGG 396.870 0.070 ... L8 2015 10 29 11 26 00 18.9841 -97.3110 4469.00 4464.00 5.00 396539 MEX 2015 10 05 17 00 00 1424-99 P co2 CCGG 396.870 0.070 ... L8 2015 10 29 11 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 396540 MEX 2015 10 16 15 00 00 2791-99 P co2 CCGG 397.880 0.070 ... L8 2015 12 02 13 54 00 18.9841 -97.3110 4469.00 4464.00 5.00 398282 MEX 2015 10 16 15 00 00 4672-99 P co2 CCGG 397.960 0.070 ... L8 2015 12 02 14 10 00 18.9841 -97.3110 4469.00 4464.00 5.00 398283 MEX 2015 10 23 15 15 00 4579-99 P co2 CCGG 398.310 0.070 ... L8 2015 12 02 14 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 398280 MEX 2015 10 23 15 15 00 4885-99 P co2 CCGG 398.320 0.070 ... L8 2015 12 02 14 41 00 18.9841 -97.3110 4469.00 4464.00 5.00 398281 MEX 2015 11 13 15 00 00 4333-99 P co2 CCGG 398.470 0.070 ... L8 2015 12 02 17 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 398285 MEX 2015 11 13 15 00 00 4996-99 P co2 CCGG 398.460 0.070 ... L8 2015 12 02 17 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 398284 MEX 2015 11 19 15 10 00 4492-99 P co2 CCGG 398.390 0.070 ... L8 2015 12 02 17 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 398286 MEX 2015 11 19 15 10 00 5386-99 P co2 CCGG 398.040 0.070 ... L8 2015 12 02 17 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 398287 MEX 2015 12 08 15 00 00 3355-99 P co2 CCGG 400.950 0.070 ... L8 2016 01 15 15 40 00 18.9841 -97.3110 4469.00 4464.00 5.00 400380 MEX 2015 12 08 15 00 00 3356-99 P co2 CCGG 400.880 0.070 ... L8 2016 01 15 15 56 00 18.9841 -97.3110 4469.00 4464.00 5.00 400381 MEX 2015 12 14 15 00 00 4443-99 P co2 CCGG 399.900 0.070 ... L8 2016 01 15 16 12 00 18.9841 -97.3110 4469.00 4464.00 5.00 400378 MEX 2015 12 14 15 00 00 4444-99 P co2 CCGG 399.810 0.070 ... L8 2016 01 15 16 28 00 18.9841 -97.3110 4469.00 4464.00 5.00 400379 MEX 2015 12 23 15 00 00 3773-99 P co2 CCGG 401.470 0.070 ... L8 2016 01 15 14 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 400376 MEX 2015 12 23 15 00 00 3774-99 P co2 CCGG 401.420 0.070 ... L8 2016 01 15 14 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 400377 MEX 2015 12 28 15 00 00 4025-99 P co2 CCGG 401.900 0.070 ... L8 2016 01 15 15 09 00 18.9841 -97.3110 4469.00 4464.00 5.00 400374 MEX 2015 12 28 15 00 00 4026-99 P co2 CCGG 401.850 0.070 ... L8 2016 01 15 15 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 400375 MEX 2016 01 11 15 30 00 3215-99 P co2 CCGG 404.110 0.070 N.. L8 2016 02 29 11 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 402458 MEX 2016 01 11 15 30 00 3216-99 P co2 CCGG 403.040 0.070 ... L8 2016 02 29 11 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 402459 MEX 2016 02 09 15 00 00 3461-99 P co2 CCGG 402.920 0.070 ... L8 2016 02 29 10 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 402460 MEX 2016 02 09 15 00 00 3462-99 P co2 CCGG 402.770 0.070 ... L8 2016 02 29 11 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 402461 MEX 2016 02 16 15 00 00 4477-99 P co2 CCGG 402.010 0.070 ... L8 2016 04 07 13 59 00 18.9841 -97.3110 4469.00 4464.00 5.00 404699 MEX 2016 02 16 15 00 00 4478-99 P co2 CCGG 401.910 0.070 ... L8 2016 04 07 14 15 00 18.9841 -97.3110 4469.00 4464.00 5.00 404700 MEX 2016 02 23 15 00 00 3383-99 P co2 CCGG 403.370 0.070 ... L8 2016 04 07 15 02 00 18.9841 -97.3110 4469.00 4464.00 5.00 404701 MEX 2016 02 23 15 00 00 3384-99 P co2 CCGG 403.400 0.070 ... L8 2016 04 07 15 18 00 18.9841 -97.3110 4469.00 4464.00 5.00 404702 MEX 2016 03 15 15 00 00 393-99 P co2 CCGG 404.160 0.070 ... L8 2016 04 07 15 34 00 18.9841 -97.3110 4469.00 4464.00 5.00 404705 MEX 2016 03 15 15 00 00 394-99 P co2 CCGG 404.160 0.070 ... L8 2016 04 07 15 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 404706 MEX 2016 03 21 15 00 00 2705-99 P co2 CCGG 404.390 0.070 ... L8 2016 04 07 13 27 00 18.9841 -97.3110 4469.00 4464.00 5.00 404704 MEX 2016 03 21 15 00 00 2706-99 P co2 CCGG 404.380 0.070 ... L8 2016 04 07 13 43 00 18.9841 -97.3110 4469.00 4464.00 5.00 404703 MEX 2016 03 29 15 00 00 3308-99 P co2 CCGG 405.230 0.070 ... L8 2016 05 13 09 59 00 18.9841 -97.3110 4469.00 4464.00 5.00 406648 MEX 2016 03 29 15 00 00 3852-99 P co2 CCGG 405.260 0.070 ... L8 2016 05 13 10 15 00 18.9841 -97.3110 4469.00 4464.00 5.00 406649 MEX 2016 04 04 15 00 00 2265-99 P co2 CCGG 406.870 0.070 ... L8 2016 05 13 11 35 00 18.9841 -97.3110 4469.00 4464.00 5.00 406647 MEX 2016 04 04 15 00 00 482-99 P co2 CCGG 406.820 0.070 ... L8 2016 05 13 11 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 406646 MEX 2016 04 12 15 00 00 1000-99 P co2 CCGG 404.260 0.070 ... L8 2016 05 10 10 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 406695 MEX 2016 04 12 15 00 00 1874-99 P co2 CCGG 404.460 0.070 ... L8 2016 05 10 10 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 406696 MEX 2016 04 18 15 00 00 1463-99 P co2 CCGG 404.880 0.070 ... L8 2016 05 10 10 59 00 18.9841 -97.3110 4469.00 4464.00 5.00 406693 MEX 2016 04 18 15 00 00 2781-99 P co2 CCGG 404.890 0.070 ... L8 2016 05 10 11 14 00 18.9841 -97.3110 4469.00 4464.00 5.00 406694 MEX 2016 04 28 15 00 00 2131-99 P co2 CCGG 407.570 0.070 ... L8 2016 06 02 16 56 00 18.9841 -97.3110 4469.00 4464.00 5.00 407732 MEX 2016 04 28 15 00 00 405-99 P co2 CCGG 407.580 0.070 ... L8 2016 06 02 16 40 00 18.9841 -97.3110 4469.00 4464.00 5.00 407731 MEX 2016 05 07 15 00 00 4160-99 P co2 CCGG 406.330 0.070 ... L8 2016 06 03 09 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 407729 MEX 2016 05 07 15 00 00 4184-99 P co2 CCGG 406.330 0.070 ... L8 2016 06 03 09 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 407730 MEX 2016 05 13 15 00 00 4443-99 P co2 CCGG 406.070 0.070 ... L8 2016 06 02 15 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 407725 MEX 2016 05 13 15 00 00 4444-99 P co2 CCGG 406.520 0.070 ... L8 2016 06 02 15 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 407726 MEX 2016 05 20 15 00 00 2784-99 P co2 CCGG 407.980 0.070 ... L8 2016 06 02 16 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 407733 MEX 2016 05 20 15 00 00 3050-99 P co2 CCGG 407.830 0.070 ... L8 2016 06 02 16 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 407734 MEX 2016 05 25 14 30 00 4120-99 P co2 CCGG 407.240 0.070 ... L8 2016 07 07 12 28 00 18.9841 -97.3110 4469.00 4464.00 5.00 409584 MEX 2016 05 25 14 30 00 4216-99 P co2 CCGG 407.510 0.070 ... L8 2016 07 07 12 12 00 18.9841 -97.3110 4469.00 4464.00 5.00 409583 MEX 2016 06 02 15 00 00 1470-99 P co2 CCGG 407.700 0.070 ... L8 2016 07 07 11 40 00 18.9841 -97.3110 4469.00 4464.00 5.00 409585 MEX 2016 06 02 15 00 00 2187-99 P co2 CCGG 407.700 0.070 ... L8 2016 07 07 11 56 00 18.9841 -97.3110 4469.00 4464.00 5.00 409586 MEX 2016 06 08 15 00 00 2881-99 P co2 CCGG 408.020 0.070 ... L8 2016 07 07 10 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 409579 MEX 2016 06 08 15 00 00 3123-99 P co2 CCGG 408.040 0.070 ... L8 2016 07 07 10 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 409580 MEX 2016 06 16 14 30 00 1807-99 P co2 CCGG 406.150 0.070 ... L8 2016 07 07 11 09 00 18.9841 -97.3110 4469.00 4464.00 5.00 409581 MEX 2016 06 16 14 30 00 2666-99 P co2 CCGG 406.220 0.070 ... L8 2016 07 07 11 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 409582 MEX 2016 07 04 14 30 00 3003-99 P co2 CCGG 404.960 0.070 ... L8 2017 03 21 09 19 00 18.9841 -97.3110 4469.00 4464.00 5.00 422452 MEX 2016 07 04 14 30 00 642-99 P co2 CCGG 404.630 0.070 ... L8 2017 03 21 09 03 00 18.9841 -97.3110 4469.00 4464.00 5.00 422453 MEX 2016 07 12 14 00 00 3361-99 P co2 CCGG 404.050 0.070 ... L10 2016 11 02 09 58 00 18.9841 -97.3110 4469.00 4464.00 5.00 415694 MEX 2016 07 12 14 00 00 5201-99 P co2 CCGG 404.000 0.070 ... L10 2016 11 02 10 14 00 18.9841 -97.3110 4469.00 4464.00 5.00 415695 MEX 2016 10 01 14 00 00 1016-99 P co2 CCGG 398.650 0.070 ... L10 2016 11 02 09 26 00 18.9841 -97.3110 4469.00 4464.00 5.00 415697 MEX 2016 10 01 14 00 00 4958-99 P co2 CCGG 398.570 0.070 ... L10 2016 11 02 09 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 415696 MEX 2016 10 03 14 00 00 3141-99 P co2 CCGG 402.760 0.070 ... L10 2016 11 28 16 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 417119 MEX 2016 10 03 14 00 00 3379-99 P co2 CCGG 402.840 0.070 ... L10 2016 11 28 16 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 417120 MEX 2016 10 07 13 30 00 4314-99 P co2 CCGG 401.200 0.070 ... L10 2016 11 02 10 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 415698 MEX 2016 10 07 13 30 00 5245-99 P co2 CCGG 401.080 0.070 ... L10 2016 11 02 10 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 415699 MEX 2016 10 11 14 00 00 1682-99 P co2 CCGG 402.560 0.070 ... L10 2016 11 28 16 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 417123 MEX 2016 10 11 14 00 00 1926-99 P co2 CCGG 402.480 0.070 ... L10 2016 11 28 16 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 417124 MEX 2016 10 14 14 00 00 3222-99 P co2 CCGG 400.800 0.070 ... L10 2016 11 01 16 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 415677 MEX 2016 10 14 14 00 00 79-99 P co2 CCGG 400.810 0.070 ... L10 2016 11 01 15 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 415676 MEX 2016 10 20 14 00 00 1916-99 P co2 CCGG 400.150 0.070 ... L10 2016 11 29 09 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 417121 MEX 2016 10 20 14 00 00 5049-99 P co2 CCGG 400.220 0.070 ... L10 2016 11 29 09 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 417122 MEX 2016 10 29 14 00 00 1254-99 P co2 CCGG 403.150 0.070 ... L10 2016 11 28 15 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 417125 MEX 2016 10 29 14 00 00 4474-99 P co2 CCGG 403.020 0.070 ... L10 2016 11 28 15 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 417126 MEX 2016 12 09 15 00 00 2938-99 P co2 CCGG 407.240 0.070 ... L8 2017 03 23 09 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 422454 MEX 2016 12 17 15 00 00 1410-99 P co2 CCGG 404.140 0.070 ... L8 2017 03 21 09 34 00 18.9841 -97.3110 4469.00 4464.00 5.00 422456 MEX 2016 12 17 15 00 00 3760-99 P co2 CCGG 404.110 0.070 ... L8 2017 03 21 09 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 422455 MEX 2016 12 22 15 00 00 5539-99 P co2 CCGG 404.230 0.070 ... L8 2017 03 22 15 59 00 18.9841 -97.3110 4469.00 4464.00 5.00 422480 MEX 2016 12 22 15 00 00 5540-99 P co2 CCGG 404.230 0.070 ... L8 2017 03 22 16 15 00 18.9841 -97.3110 4469.00 4464.00 5.00 422481 MEX 2016 12 29 15 00 00 5507-99 P co2 CCGG 403.390 0.070 ... L8 2017 03 22 16 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 422482 MEX 2016 12 29 15 00 00 5508-99 P co2 CCGG 403.670 0.070 ... L8 2017 03 22 16 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 422483 MEX 2017 01 13 15 00 00 1301-99 P co2 CCGG 405.980 0.070 ... L10 2017 02 16 15 26 00 18.9841 -97.3110 4469.00 4464.00 5.00 420727 MEX 2017 01 13 15 00 00 3789-99 P co2 CCGG 405.930 0.070 ... L10 2017 02 16 15 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 420728 MEX 2017 01 26 15 00 00 407-99 P co2 CCGG 404.550 0.070 ... L10 2017 02 22 16 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 421131 MEX 2017 01 26 15 00 00 5128-99 P co2 CCGG 404.650 0.070 ... L10 2017 02 22 16 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 421132 MEX 2017 01 28 15 00 00 4765-99 P co2 CCGG 405.160 0.070 ... L10 2017 02 17 09 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 420738 MEX 2017 01 28 15 00 00 5465-99 P co2 CCGG 405.020 0.070 ... L10 2017 02 17 10 05 00 18.9841 -97.3110 4469.00 4464.00 5.00 420739 MEX 2017 02 03 15 00 00 3203-99 P co2 CCGG 405.140 0.070 ... L10 2017 02 17 10 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 420736 MEX 2017 02 03 15 00 00 5608-99 P co2 CCGG 405.030 0.070 ... L10 2017 02 17 10 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 420737 MEX 2017 02 17 15 00 00 5055-99 P co2 CCGG 406.190 0.070 ... L8 2017 03 31 12 48 00 18.9841 -97.3110 4469.00 4464.00 5.00 422828 MEX 2017 02 17 15 00 00 5101-99 P co2 CCGG 406.230 0.070 ... L8 2017 03 31 12 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 422827 MEX 2017 02 23 14 30 00 4162-99 P co2 CCGG 406.030 0.070 ... L8 2017 03 31 13 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 422831 MEX 2017 02 23 14 30 00 4388-99 P co2 CCGG 406.020 0.070 ... L8 2017 03 31 13 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 422832 MEX 2017 03 04 15 00 00 4687-99 P co2 CCGG 407.190 0.070 ... L8 2017 03 30 16 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 422829 MEX 2017 03 04 15 00 00 5033-99 P co2 CCGG 407.160 0.070 ... L8 2017 03 30 16 41 00 18.9841 -97.3110 4469.00 4464.00 5.00 422830 MEX 2017 03 10 14 30 00 3597-99 P co2 CCGG 407.570 0.070 ... L8 2017 03 31 12 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 422826 MEX 2017 03 10 14 30 00 4078-99 P co2 CCGG 407.490 0.070 ... L8 2017 03 31 12 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 422825 MEX 2017 03 20 15 00 00 3766-99 P co2 CCGG 408.400 0.070 ... L8 2017 04 26 10 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 424211 MEX 2017 03 20 15 00 00 4911-99 P co2 CCGG 408.270 0.070 ... L8 2017 04 26 11 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 424212 MEX 2017 03 25 14 00 00 1479-99 P co2 CCGG 407.650 0.070 ... L8 2017 04 26 11 16 00 18.9841 -97.3110 4469.00 4464.00 5.00 424209 MEX 2017 03 25 14 00 00 2881-99 P co2 CCGG 407.560 0.070 ... L8 2017 04 26 11 32 00 18.9841 -97.3110 4469.00 4464.00 5.00 424210 MEX 2017 04 01 15 00 00 1616-99 P co2 CCGG 406.170 0.070 ... L8 2017 04 26 12 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 424215 MEX 2017 04 01 15 00 00 5717-99 P co2 CCGG 406.100 0.070 ... L8 2017 04 26 13 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 424216 MEX 2017 04 08 14 30 00 5573-99 P co2 CCGG 409.060 0.070 ... L8 2017 04 26 13 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 424213 MEX 2017 04 08 14 30 00 5579-99 P co2 CCGG 409.130 0.070 ... L8 2017 04 26 13 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 424214 MEX 2017 04 22 14 00 00 1246-99 P co2 CCGG 410.150 0.070 ... L8 2017 06 07 15 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 426035 MEX 2017 04 22 14 00 00 5253-99 P co2 CCGG 409.810 0.070 N.. L8 2017 06 07 15 58 00 18.9841 -97.3110 4469.00 4464.00 5.00 426036 MEX 2017 04 29 14 30 00 1572-99 P co2 CCGG 406.920 0.070 ... L8 2017 06 07 16 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 426034 MEX 2017 04 29 14 30 00 618-99 P co2 CCGG 406.920 0.070 ... L8 2017 06 07 16 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 426033 MEX 2017 05 05 14 00 00 2249-99 P co2 CCGG 409.410 0.070 ... L8 2017 06 07 15 26 00 18.9841 -97.3110 4469.00 4464.00 5.00 426029 MEX 2017 05 05 14 00 00 536-99 P co2 CCGG 409.370 0.070 ... L8 2017 06 07 15 10 00 18.9841 -97.3110 4469.00 4464.00 5.00 426030 MEX 2017 05 13 14 00 00 25-99 P co2 CCGG 410.120 0.070 ... L8 2017 06 07 13 03 00 18.9841 -97.3110 4469.00 4464.00 5.00 426032 MEX 2017 05 13 14 00 00 3449-99 P co2 CCGG 410.130 0.070 ... L8 2017 06 07 13 19 00 18.9841 -97.3110 4469.00 4464.00 5.00 426031 MEX 2017 05 20 14 30 00 1156-99 P co2 CCGG 410.480 0.070 ... L8 2017 06 29 10 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 427255 MEX 2017 05 20 14 30 00 3362-99 P co2 CCGG 410.390 0.070 ... L8 2017 06 29 11 05 00 18.9841 -97.3110 4469.00 4464.00 5.00 427256 MEX 2017 05 27 14 30 00 1458-99 P co2 CCGG 407.980 0.070 ... L8 2017 06 26 12 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 427340 MEX 2017 05 27 14 30 00 4234-99 P co2 CCGG 407.960 0.070 ... L8 2017 06 26 12 57 00 18.9841 -97.3110 4469.00 4464.00 5.00 427341 MEX 2017 06 03 14 30 00 1864-99 P co2 CCGG 408.870 0.070 ... L8 2017 06 29 12 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 427261 MEX 2017 06 03 14 30 00 3614-99 P co2 CCGG 407.770 0.070 N.. L8 2017 06 29 12 40 00 18.9841 -97.3110 4469.00 4464.00 5.00 427262 MEX 2017 06 10 14 00 00 1563-99 P co2 CCGG 409.180 0.070 ... L8 2017 06 26 13 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 427264 MEX 2017 06 10 14 00 00 912-99 P co2 CCGG 409.240 0.070 ... L8 2017 06 26 13 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 427263 MEX 2017 06 17 14 00 00 4310-99 P co2 CCGG 406.630 0.070 ... L8 2017 08 11 14 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 428857 MEX 2017 06 17 14 00 00 4658-99 P co2 CCGG 406.640 0.070 ... L8 2017 08 11 14 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 428858 MEX 2017 06 24 14 00 00 3156-99 P co2 CCGG 406.770 0.070 ... L8 2017 08 11 11 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 428859 MEX 2017 06 24 14 00 00 3469-99 P co2 CCGG 406.870 0.070 ... L8 2017 08 11 11 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 428860 MEX 2017 07 08 14 00 00 2131-99 P co2 CCGG 409.840 0.070 ... L8 2017 08 09 15 44 00 18.9841 -97.3110 4469.00 4464.00 5.00 428855 MEX 2017 07 08 14 00 00 3536-99 P co2 CCGG 409.720 0.070 ... L8 2017 08 09 16 00 00 18.9841 -97.3110 4469.00 4464.00 5.00 428856 MEX 2017 07 15 14 00 00 4338-99 P co2 CCGG 406.380 0.070 ... L8 2017 08 09 15 12 00 18.9841 -97.3110 4469.00 4464.00 5.00 428853 MEX 2017 07 15 14 00 00 5175-99 P co2 CCGG 406.520 0.070 ... L8 2017 08 09 15 27 00 18.9841 -97.3110 4469.00 4464.00 5.00 428854 MEX 2017 07 21 14 00 00 1383-99 P co2 CCGG 405.360 0.070 ... L8 2017 09 19 15 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 430661 MEX 2017 07 21 14 00 00 3977-99 P co2 CCGG 405.530 0.070 ... L8 2017 09 19 15 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 430662 MEX 2017 08 02 14 00 00 3674-99 P co2 CCGG 404.820 0.070 ... L8 2017 09 19 15 55 00 18.9841 -97.3110 4469.00 4464.00 5.00 430665 MEX 2017 08 02 14 00 00 4307-99 P co2 CCGG 404.680 0.070 ... L8 2017 09 19 16 11 00 18.9841 -97.3110 4469.00 4464.00 5.00 430666 MEX 2017 08 08 14 00 00 4948-99 P co2 CCGG 402.300 0.070 ... L8 2017 09 19 15 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 430664 MEX 2017 08 08 14 00 00 640-99 P co2 CCGG 402.140 0.070 ... L8 2017 09 19 14 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 430663 MEX 2017 08 19 14 00 00 4853-99 P co2 CCGG 403.200 0.070 ... L8 2017 09 19 14 16 00 18.9841 -97.3110 4469.00 4464.00 5.00 430659 MEX 2017 08 19 14 00 00 5703-99 P co2 CCGG 408.860 0.070 N.. L8 2017 09 19 14 32 00 18.9841 -97.3110 4469.00 4464.00 5.00 430660 MEX 2017 09 07 14 00 00 3347-99 P co2 CCGG 403.250 0.070 ... L8 2017 10 10 15 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 431998 MEX 2017 09 07 14 00 00 571-99 P co2 CCGG 403.170 0.070 ... L8 2017 10 10 15 02 00 18.9841 -97.3110 4469.00 4464.00 5.00 431999 MEX 2017 09 14 14 30 00 1573-99 P co2 CCGG 403.340 0.070 ... L8 2017 10 10 15 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 431996 MEX 2017 09 14 14 30 00 4836-99 P co2 CCGG 403.320 0.070 ... L8 2017 10 10 15 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 431997 MEX 2017 09 19 14 00 00 419-99 P co2 CCGG 402.300 0.070 ... L8 2017 10 11 14 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 431986 MEX 2017 09 19 14 00 00 420-99 P co2 CCGG 402.330 0.070 ... L8 2017 10 11 15 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 431987 MEX 2017 09 26 14 00 00 3475-99 P co2 CCGG 401.430 0.070 ... L8 2017 10 11 14 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 431984 MEX 2017 09 26 14 00 00 3476-99 P co2 CCGG 401.290 0.070 ... L8 2017 10 11 14 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 431985 MEX 2017 10 06 14 00 00 2551-99 P co2 CCGG 403.720 0.070 ... L8 2017 11 27 13 11 00 18.9841 -97.3110 4469.00 4464.00 5.00 434359 MEX 2017 10 06 14 00 00 2552-99 P co2 CCGG 403.610 0.070 ... L8 2017 11 27 13 27 00 18.9841 -97.3110 4469.00 4464.00 5.00 434360 MEX 2017 10 16 14 00 00 2841-99 P co2 CCGG 401.790 0.070 ... L8 2017 11 27 11 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 434361 MEX 2017 10 16 14 00 00 2842-99 P co2 CCGG 401.720 0.070 ... L8 2017 11 27 11 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 434362 MEX 2017 10 25 14 30 00 5435-99 P co2 CCGG 405.030 0.070 ... L8 2017 11 20 12 59 00 18.9841 -97.3110 4469.00 4464.00 5.00 434347 MEX 2017 10 25 14 30 00 5436-99 P co2 CCGG 404.970 0.070 ... L8 2017 11 20 13 14 00 18.9841 -97.3110 4469.00 4464.00 5.00 434348 MEX 2017 10 31 14 30 00 631-99 P co2 CCGG 402.920 0.070 ... L8 2017 11 20 13 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 434349 MEX 2017 10 31 14 30 00 632-99 P co2 CCGG 402.830 0.070 ... L8 2017 11 20 13 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 434350 MEX 2017 11 06 15 00 00 91-99 P co2 CCGG 402.230 0.070 ... L8 2018 01 02 15 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 436095 MEX 2017 11 06 15 00 00 92-99 P co2 CCGG 402.200 0.070 ... L8 2018 01 02 15 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 436096 MEX 2017 11 17 15 00 00 269-99 P co2 CCGG 403.320 0.070 ... L8 2018 01 02 16 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 436097 MEX 2017 11 17 15 00 00 270-99 P co2 CCGG 403.090 0.070 ... L8 2018 01 02 16 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 436098 MEX 2017 11 24 15 00 00 1097-99 P co2 CCGG 405.560 0.070 ... L8 2017 12 20 12 31 00 18.9841 -97.3110 4469.00 4464.00 5.00 435788 MEX 2017 11 24 15 00 00 2489-99 P co2 CCGG 405.640 0.070 ... L8 2017 12 20 12 47 00 18.9841 -97.3110 4469.00 4464.00 5.00 435789 MEX 2017 12 02 15 00 00 2096-99 P co2 CCGG 405.120 0.070 ... L8 2017 12 20 13 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 435790 MEX 2017 12 02 15 00 00 673-99 P co2 CCGG 405.190 0.070 ... L8 2017 12 20 13 35 00 18.9841 -97.3110 4469.00 4464.00 5.00 435791 MEX 2017 12 09 15 00 00 1438-99 P co2 CCGG 405.730 0.070 ... L8 2018 01 31 16 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 437569 MEX 2017 12 09 15 00 00 2139-99 P co2 CCGG 405.760 0.070 ... L8 2018 01 31 16 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 437570 MEX 2017 12 23 15 00 00 1363-99 P co2 CCGG 405.530 0.070 ... L8 2018 02 01 15 02 00 18.9841 -97.3110 4469.00 4464.00 5.00 437615 MEX 2017 12 23 15 00 00 5342-99 P co2 CCGG 405.540 0.070 ... L8 2018 02 01 15 18 00 18.9841 -97.3110 4469.00 4464.00 5.00 437616 MEX 2017 12 29 15 00 00 3111-99 P co2 CCGG 406.560 0.070 ... L8 2018 02 01 14 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 437611 MEX 2017 12 29 15 00 00 3112-99 P co2 CCGG 404.690 0.070 N.. L8 2018 02 01 14 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 437612 MEX 2018 01 06 15 00 00 4113-99 P co2 CCGG 407.060 0.070 ... L8 2018 02 01 15 34 00 18.9841 -97.3110 4469.00 4464.00 5.00 437613 MEX 2018 01 06 15 00 00 4114-99 P co2 CCGG 407.020 0.070 ... L8 2018 02 01 15 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 437614 MEX 2018 01 13 15 00 00 4997-99 P co2 CCGG 407.220 0.070 ... L8 2018 02 28 13 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 438962 MEX 2018 01 13 15 00 00 4998-99 P co2 CCGG 407.080 0.070 ... L8 2018 02 28 14 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 438963 MEX 2018 01 20 15 00 00 3849-99 P co2 CCGG 407.370 0.070 ... L8 2018 02 28 14 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 438964 MEX 2018 01 20 15 00 00 3850-99 P co2 CCGG 407.470 0.070 ... L8 2018 02 28 14 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 438965 MEX 2018 01 27 15 00 00 5782-99 P co2 CCGG 408.310 0.070 ... L8 2018 02 28 10 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 438958 MEX 2018 01 27 15 00 00 5893-99 P co2 CCGG 408.240 0.070 ... L8 2018 02 28 10 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 438959 MEX 2018 02 03 15 00 00 5780-99 P co2 CCGG 407.220 0.070 ... L8 2018 02 28 09 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 438960 MEX 2018 02 03 15 00 00 5855-99 P co2 CCGG 407.230 0.070 ... L8 2018 02 28 09 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 438961 MEX 2018 02 10 15 00 00 254-99 P co2 CCGG 408.860 0.070 ... L8 2018 03 27 15 10 00 18.9841 -97.3110 4469.00 4464.00 5.00 440670 MEX 2018 02 10 15 00 00 2639-99 P co2 CCGG 408.960 0.070 ... L8 2018 03 27 15 26 00 18.9841 -97.3110 4469.00 4464.00 5.00 440671 MEX 2018 02 17 15 00 00 5861-99 P co2 CCGG 407.740 0.070 ... L8 2018 03 27 14 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 440675 MEX 2018 02 17 15 00 00 5863-99 P co2 CCGG 407.770 0.070 ... L8 2018 03 27 14 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 440676 MEX 2018 02 24 15 00 00 5690-99 P co2 CCGG 407.360 0.070 ... L8 2018 03 28 09 55 00 18.9841 -97.3110 4469.00 4464.00 5.00 440674 MEX 2018 03 03 15 00 00 4975-99 P co2 CCGG 408.360 0.070 ... L8 2018 03 27 14 54 00 18.9841 -97.3110 4469.00 4464.00 5.00 440673 MEX 2018 03 03 15 00 00 954-99 P co2 CCGG 408.000 0.070 ... L8 2018 03 27 14 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 440672 MEX 2018 03 07 14 00 00 5667-99 P co2 CCGG 410.830 0.070 ... L8 2018 04 16 13 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 441500 MEX 2018 03 07 14 00 00 5668-99 P co2 CCGG 410.860 0.070 ... L8 2018 04 16 13 57 00 18.9841 -97.3110 4469.00 4464.00 5.00 441501 MEX 2018 03 16 15 00 00 1139-99 P co2 CCGG 411.270 0.070 N.. L8 2018 04 16 14 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 441502 MEX 2018 03 16 15 00 00 88-99 P co2 CCGG 409.330 0.070 ... L8 2018 04 16 14 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 441503 MEX 2018 03 24 15 00 00 3044-99 P co2 CCGG 407.520 0.070 ... L8 2018 04 13 11 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 441386 MEX 2018 03 24 15 00 00 4011-99 P co2 CCGG 407.670 0.070 ... L8 2018 04 13 11 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 441385 MEX 2018 04 07 14 00 00 2361-99 P co2 CCGG 410.730 0.070 ... L8 2018 04 13 12 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 441379 MEX 2018 04 07 14 00 00 2362-99 P co2 CCGG 410.600 0.070 ... L8 2018 04 13 12 24 00 18.9841 -97.3110 4469.00 4464.00 5.00 441380 MEX 2018 04 13 14 00 00 2683-99 P co2 CCGG 412.770 0.070 ... L8 2018 06 05 16 16 00 18.9841 -97.3110 4469.00 4464.00 5.00 444728 MEX 2018 04 13 14 00 00 2684-99 P co2 CCGG 412.700 0.070 ... L8 2018 06 05 16 31 00 18.9841 -97.3110 4469.00 4464.00 5.00 444729 MEX 2018 04 21 14 00 00 1343-99 P co2 CCGG 410.600 0.070 ... L8 2018 06 06 09 26 00 18.9841 -97.3110 4469.00 4464.00 5.00 444726 MEX 2018 04 21 14 00 00 1344-99 P co2 CCGG 410.570 0.070 ... L8 2018 06 06 09 10 00 18.9841 -97.3110 4469.00 4464.00 5.00 444727 MEX 2018 04 28 14 00 00 2892-99 P co2 CCGG 414.370 0.070 ... L8 2018 06 07 10 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 444737 MEX 2018 05 04 14 00 00 5209-99 P co2 CCGG 410.280 0.070 ... L8 2018 06 05 13 05 00 18.9841 -97.3110 4469.00 4464.00 5.00 444719 MEX 2018 05 12 14 00 00 4472-99 P co2 CCGG 413.440 0.070 ... L8 2018 07 09 10 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 446050 MEX 2018 05 12 14 00 00 849-99 P co2 CCGG 413.510 0.070 ... L8 2018 07 09 10 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 446049 MEX 2018 05 26 14 00 00 4537-99 P co2 CCGG 412.060 0.070 ... L8 2018 07 06 16 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 446046 MEX 2018 05 26 14 00 00 4612-99 P co2 CCGG 412.200 0.070 ... L8 2018 07 06 16 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 446045 MEX 2018 06 02 14 30 00 1640-99 P co2 CCGG 411.910 0.070 ... L8 2018 07 06 15 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 446047 MEX 2018 06 02 14 30 00 3526-99 P co2 CCGG 411.810 0.070 ... L8 2018 07 06 15 48 00 18.9841 -97.3110 4469.00 4464.00 5.00 446048 MEX 2018 06 09 14 30 00 3288-99 P co2 CCGG 410.440 0.070 ... L8 2018 07 06 15 01 00 18.9841 -97.3110 4469.00 4464.00 5.00 446043 MEX 2018 06 09 14 30 00 5426-99 P co2 CCGG 410.660 0.070 ... L8 2018 07 06 15 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 446044 MEX 2018 06 16 14 30 00 2791-99 P co2 CCGG 411.620 0.070 ... L8 2018 08 15 12 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 447532 MEX 2018 06 16 14 30 00 4066-99 P co2 CCGG 411.370 0.070 ... L8 2018 08 15 12 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 447533 MEX 2018 07 07 14 00 00 2547-99 P co2 CCGG 408.850 0.070 ... L8 2018 08 15 13 11 00 18.9841 -97.3110 4469.00 4464.00 5.00 447530 MEX 2018 07 07 14 00 00 3400-99 P co2 CCGG 409.040 0.070 ... L8 2018 08 15 13 27 00 18.9841 -97.3110 4469.00 4464.00 5.00 447531 MEX 2018 07 14 14 30 00 3445-99 P co2 CCGG 408.420 0.070 ... L8 2018 08 15 13 43 00 18.9841 -97.3110 4469.00 4464.00 5.00 447534 MEX 2018 07 14 14 30 00 4248-99 P co2 CCGG 408.440 0.070 ... L8 2018 08 15 13 58 00 18.9841 -97.3110 4469.00 4464.00 5.00 447535 MEX 2018 07 21 14 00 00 3289-99 P co2 CCGG 407.810 0.070 ... L8 2018 08 15 12 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 447536 MEX 2018 07 21 14 00 00 3959-99 P co2 CCGG 407.760 0.070 ... L8 2018 08 15 12 55 00 18.9841 -97.3110 4469.00 4464.00 5.00 447537 MEX 2018 08 04 14 00 00 1906-99 P co2 CCGG 406.000 0.070 ... L8 2018 09 07 15 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 448613 MEX 2018 08 04 14 00 00 3410-99 P co2 CCGG 406.060 0.070 ... L8 2018 09 07 15 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 448614 MEX 2018 08 11 14 30 00 3733-99 P co2 CCGG 405.970 0.070 ... L8 2018 09 07 15 02 00 18.9841 -97.3110 4469.00 4464.00 5.00 448611 MEX 2018 08 11 14 30 00 4885-99 P co2 CCGG 405.710 0.070 ... L8 2018 09 07 15 17 00 18.9841 -97.3110 4469.00 4464.00 5.00 448612 MEX 2018 08 18 14 00 00 1411-99 P co2 CCGG 406.150 0.070 ... L8 2018 09 07 14 29 00 18.9841 -97.3110 4469.00 4464.00 5.00 448623 MEX 2018 08 18 14 00 00 2572-99 P co2 CCGG 406.140 0.070 ... L8 2018 09 07 14 45 00 18.9841 -97.3110 4469.00 4464.00 5.00 448624 MEX 2018 08 23 14 00 00 1175-99 P co2 CCGG 405.320 0.070 ... L8 2018 09 07 13 57 00 18.9841 -97.3110 4469.00 4464.00 5.00 448625 MEX 2018 08 23 14 00 00 3028-99 P co2 CCGG 405.140 0.070 ... L8 2018 09 07 14 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 448626 MEX 2018 09 05 14 00 00 3651-99 P co2 CCGG 404.910 0.070 ... L8 2018 10 16 10 09 00 18.9841 -97.3110 4469.00 4464.00 5.00 450112 MEX 2018 09 05 14 00 00 4036-99 P co2 CCGG 404.960 0.070 ... L8 2018 10 16 10 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 450113 MEX 2018 09 17 14 30 00 1113-99 P co2 CCGG 403.760 0.070 ... L8 2018 10 16 09 37 00 18.9841 -97.3110 4469.00 4464.00 5.00 450115 MEX 2018 09 17 14 30 00 2317-99 P co2 CCGG 404.040 0.070 ... L8 2018 10 16 09 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 450114 MEX 2018 09 25 14 30 00 2633-99 P co2 CCGG 404.700 0.070 ... L8 2018 10 15 14 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 450108 MEX 2018 09 25 14 30 00 2634-99 P co2 CCGG 404.840 0.070 ... L8 2018 10 15 14 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 450109 MEX 2018 10 09 14 00 00 2065-99 P co2 CCGG 404.680 0.070 ... L8 2018 10 15 12 47 00 18.9841 -97.3110 4469.00 4464.00 5.00 450110 MEX 2018 10 09 14 00 00 2066-99 P co2 CCGG 405.060 0.070 ... L8 2018 10 15 13 03 00 18.9841 -97.3110 4469.00 4464.00 5.00 450111 MEX 2018 10 13 14 00 00 3303-99 P co2 CCGG 405.230 0.070 ... L8 2018 12 21 11 25 00 18.9841 -97.3110 4469.00 4464.00 5.00 452806 MEX 2018 10 13 14 00 00 3304-99 P co2 CCGG 405.090 0.070 ... L8 2018 12 21 11 41 00 18.9841 -97.3110 4469.00 4464.00 5.00 452807 MEX 2018 10 23 14 00 00 3531-99 P co2 CCGG 406.770 0.070 ... L8 2018 12 21 10 54 00 18.9841 -97.3110 4469.00 4464.00 5.00 452810 MEX 2018 10 23 14 00 00 3532-99 P co2 CCGG 406.780 0.070 ... L8 2018 12 21 11 09 00 18.9841 -97.3110 4469.00 4464.00 5.00 452811 MEX 2018 10 30 14 30 00 3947-99 P co2 CCGG 406.650 0.070 ... L8 2018 12 21 10 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 452804 MEX 2018 10 30 14 30 00 3948-99 P co2 CCGG 406.560 0.070 ... L8 2018 12 21 10 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 452805 MEX 2018 11 06 14 00 00 3413-99 P co2 CCGG 405.910 0.070 ... L8 2018 12 21 09 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 452808 MEX 2018 11 06 14 00 00 3414-99 P co2 CCGG 405.770 0.070 ... L8 2018 12 21 10 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 452809 MEX 2018 11 13 14 30 00 3411-99 P co2 CCGG 407.200 0.070 ... L8 2019 01 25 13 39 00 18.9841 -97.3110 4469.00 4464.00 5.00 453440 MEX 2018 11 13 14 30 00 3412-99 P co2 CCGG 407.430 0.070 ... L8 2019 01 25 13 55 00 18.9841 -97.3110 4469.00 4464.00 5.00 453441 MEX 2018 11 17 14 00 00 5831-99 P co2 CCGG 408.000 0.070 ... L8 2019 01 25 13 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 453438 MEX 2018 11 17 14 00 00 5832-99 P co2 CCGG 408.000 0.070 ... L8 2019 01 25 13 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 453439 MEX 2018 11 24 14 30 00 2822-99 P co2 CCGG 407.340 0.070 ... L8 2019 01 24 16 59 00 18.9841 -97.3110 4469.00 4464.00 5.00 453446 MEX 2018 11 24 14 30 00 5677-99 P co2 CCGG 407.410 0.070 ... L8 2019 01 24 17 15 00 18.9841 -97.3110 4469.00 4464.00 5.00 453447 MEX 2018 12 01 14 30 00 1441-99 P co2 CCGG 408.750 0.070 ... L8 2019 01 25 09 26 00 18.9841 -97.3110 4469.00 4464.00 5.00 453448 MEX 2018 12 01 14 30 00 4918-99 P co2 CCGG 408.780 0.070 ... L8 2019 01 25 09 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 453449 MEX 2018 12 11 14 30 00 2726-99 P co2 CCGG 409.990 0.070 ... L8 2019 02 26 15 04 00 18.9841 -97.3110 4469.00 4464.00 5.00 454357 MEX 2018 12 11 14 30 00 4265-99 P co2 CCGG 410.000 0.070 ... L8 2019 02 26 15 20 00 18.9841 -97.3110 4469.00 4464.00 5.00 454358 MEX 2018 12 19 15 00 00 2239-99 P co2 CCGG 408.670 0.070 ... L8 2019 02 26 16 08 00 18.9841 -97.3110 4469.00 4464.00 5.00 454359 MEX 2018 12 19 15 00 00 3766-99 P co2 CCGG 408.640 0.070 ... L8 2019 02 26 16 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 454360 MEX 2019 01 03 15 00 00 3363-99 P co2 CCGG 409.490 0.070 ... L8 2019 02 26 15 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 454355 MEX 2019 01 03 15 00 00 3364-99 P co2 CCGG 409.560 0.070 ... L8 2019 02 26 15 52 00 18.9841 -97.3110 4469.00 4464.00 5.00 454356 MEX 2019 01 10 15 00 00 331-99 P co2 CCGG 409.630 0.070 ... L8 2019 02 26 14 33 00 18.9841 -97.3110 4469.00 4464.00 5.00 454353 MEX 2019 01 10 15 00 00 332-99 P co2 CCGG 409.700 0.070 ... L8 2019 02 26 14 49 00 18.9841 -97.3110 4469.00 4464.00 5.00 454354 MEX 2019 01 18 14 30 00 1983-99 P co2 CCGG 409.700 0.070 ... L8 2019 03 08 13 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 455217 MEX 2019 01 18 14 30 00 1984-99 P co2 CCGG 409.660 0.070 ... L8 2019 03 08 13 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 455218 MEX 2019 01 24 15 00 00 595-99 P co2 CCGG 409.410 0.070 ... L8 2019 03 08 13 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 455215 MEX 2019 01 24 15 00 00 596-99 P co2 CCGG 408.470 0.070 N.. L8 2019 03 08 14 09 00 18.9841 -97.3110 4469.00 4464.00 5.00 455216 MEX 2019 01 31 14 30 00 27-99 P co2 CCGG 410.900 0.070 ... L8 2019 04 05 13 34 00 18.9841 -97.3110 4469.00 4464.00 5.00 456588 MEX 2019 01 31 14 30 00 792-99 P co2 CCGG 410.530 0.070 ... L8 2019 04 05 13 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 456589 MEX 2019 02 11 14 30 00 1407-99 P co2 CCGG 410.010 0.070 ... L8 2019 04 05 14 05 00 18.9841 -97.3110 4469.00 4464.00 5.00 456591 MEX 2019 02 11 14 30 00 5316-99 P co2 CCGG 410.120 0.070 ... L8 2019 04 05 14 21 00 18.9841 -97.3110 4469.00 4464.00 5.00 456590 MEX 2019 02 15 14 00 00 1214-99 P co2 CCGG 410.070 0.070 ... L8 2019 03 08 12 19 00 18.9841 -97.3110 4469.00 4464.00 5.00 455211 MEX 2019 02 15 14 00 00 4213-99 P co2 CCGG 410.320 0.070 ... L8 2019 03 08 12 34 00 18.9841 -97.3110 4469.00 4464.00 5.00 455212 MEX 2019 02 22 14 00 00 2748-99 P co2 CCGG 409.790 0.070 ... L8 2019 03 08 12 50 00 18.9841 -97.3110 4469.00 4464.00 5.00 455213 MEX 2019 02 22 14 00 00 4542-99 P co2 CCGG 409.870 0.070 ... L8 2019 03 08 13 06 00 18.9841 -97.3110 4469.00 4464.00 5.00 455214 MEX 2019 03 02 14 00 00 2231-99 P co2 CCGG 412.030 0.070 ... L8 2019 04 08 15 15 00 18.9841 -97.3110 4469.00 4464.00 5.00 456625 MEX 2019 03 02 14 00 00 486-99 P co2 CCGG 411.830 0.070 ... L8 2019 04 08 14 59 00 18.9841 -97.3110 4469.00 4464.00 5.00 456624 MEX 2019 03 08 14 00 00 2124-99 P co2 CCGG 410.560 0.070 ... L8 2019 04 08 14 27 00 18.9841 -97.3110 4469.00 4464.00 5.00 456626 MEX 2019 03 08 14 00 00 3394-99 P co2 CCGG 410.680 0.070 ... L8 2019 04 08 14 43 00 18.9841 -97.3110 4469.00 4464.00 5.00 456627 MEX 2019 03 14 14 30 00 1747-99 P co2 CCGG 411.580 0.070 ... L8 2019 06 10 10 30 00 18.9841 -97.3110 4469.00 4464.00 5.00 459389 MEX 2019 03 14 14 30 00 2793-99 P co2 CCGG 411.560 0.070 ... L8 2019 06 10 10 46 00 18.9841 -97.3110 4469.00 4464.00 5.00 459390 MEX 2019 03 25 14 30 00 1827-99 P co2 CCGG 413.160 0.070 ... L8 2019 06 10 11 02 00 18.9841 -97.3110 4469.00 4464.00 5.00 459391 MEX 2019 03 25 14 30 00 2154-99 P co2 CCGG 412.870 0.070 N.. L8 2019 06 10 11 18 00 18.9841 -97.3110 4469.00 4464.00 5.00 459392 MEX 2019 04 03 14 30 00 3425-99 P co2 CCGG 413.590 0.070 ... L8 2019 07 26 17 36 00 18.9841 -97.3110 4469.00 4464.00 5.00 462073 MEX 2019 04 03 14 30 00 3906-99 P co2 CCGG 414.080 0.070 ... L8 2019 07 26 17 51 00 18.9841 -97.3110 4469.00 4464.00 5.00 462074 MEX 2019 04 13 13 30 00 1667-99 P co2 CCGG 414.730 0.070 ... L8 2019 06 07 16 53 00 18.9841 -97.3110 4469.00 4464.00 5.00 459385 MEX 2019 04 13 13 30 00 1668-99 P co2 CCGG 414.700 0.070 ... L8 2019 06 07 17 09 00 18.9841 -97.3110 4469.00 4464.00 5.00 459386 MEX 2019 05 01 14 00 00 3671-99 P co2 CCGG 413.360 0.070 ... L8 2019 06 07 16 22 00 18.9841 -97.3110 4469.00 4464.00 5.00 459387 MEX 2019 05 01 14 00 00 3672-99 P co2 CCGG 413.340 0.070 ... L8 2019 06 07 16 38 00 18.9841 -97.3110 4469.00 4464.00 5.00 459388 MEX 2019 05 07 14 30 00 1961-99 P co2 CCGG 413.500 0.070 ... L8 2019 07 26 14 26 00 18.9841 -97.3110 4469.00 4464.00 5.00 461900 MEX 2019 05 07 14 30 00 4027-99 P co2 CCGG 413.410 0.070 ... L8 2019 07 26 14 42 00 18.9841 -97.3110 4469.00 4464.00 5.00 461901 MEX 2019 05 16 14 00 00 2361-99 P co2 CCGG 416.880 0.070 ... L8 2019 07 26 18 07 00 18.9841 -97.3110 4469.00 4464.00 5.00 462075 MEX 2019 05 16 14 00 00 5864-99 P co2 CCGG 416.750 0.070 ... L8 2019 07 26 18 23 00 18.9841 -97.3110 4469.00 4464.00 5.00 462076 MEX 2019 05 23 14 00 00 3054-99 P co2 CCGG 416.570 0.070 ... L8 2019 07 26 14 57 00 18.9841 -97.3110 4469.00 4464.00 5.00 461898 MEX 2019 05 23 14 00 00 3129-99 P co2 CCGG 416.640 0.070 ... L8 2019 07 26 15 13 00 18.9841 -97.3110 4469.00 4464.00 5.00 461899 MEX 2019 06 03 13 40 00 1156-99 P co2 CCGG 416.050 0.041 N.. PC2 2019 08 09 09 57 42 18.9841 -97.3110 4469.00 4464.00 5.00 462671 MEX 2019 06 03 13 40 00 3194-99 P co2 CCGG 417.710 0.041 N.. PC2 2019 08 09 09 43 26 18.9841 -97.3110 4469.00 4464.00 5.00 462670 MEX 2019 06 13 14 00 00 2396-99 P co2 CCGG 413.970 0.041 ... PC2 2019 08 09 10 11 59 18.9841 -97.3110 4469.00 4464.00 5.00 462672 MEX 2019 06 13 14 00 00 5553-99 P co2 CCGG 413.860 0.041 ... PC2 2019 08 09 10 26 16 18.9841 -97.3110 4469.00 4464.00 5.00 462673 MEX 2019 07 12 13 30 00 2041-99 P co2 CCGG 412.720 0.041 N.. PC2 2019 08 09 13 03 27 18.9841 -97.3110 4469.00 4464.00 5.00 462884 MEX 2019 07 12 13 30 00 2042-99 P co2 CCGG 413.270 0.041 N.. PC2 2019 08 09 13 17 43 18.9841 -97.3110 4469.00 4464.00 5.00 462885 MEX 2019 07 19 14 00 00 5117-99 P co2 CCGG 410.200 0.041 ... PC2 2019 08 09 12 34 51 18.9841 -97.3110 4469.00 4464.00 5.00 462882 MEX 2019 07 19 14 00 00 5118-99 P co2 CCGG 410.030 0.041 ... PC2 2019 08 09 12 49 09 18.9841 -97.3110 4469.00 4464.00 5.00 462883 MEX 2019 07 26 14 00 00 3363-99 P co2 CCGG 409.510 0.041 ... PC2 2019 09 18 10 55 25 18.9841 -97.3110 4469.00 4464.00 5.00 464542 MEX 2019 07 26 14 00 00 3364-99 P co2 CCGG 409.580 0.041 ... PC2 2019 09 18 11 09 40 18.9841 -97.3110 4469.00 4464.00 5.00 464543 MEX 2019 08 02 13 30 00 2289-99 P co2 CCGG 409.570 0.041 ... PC2 2019 09 18 10 26 48 18.9841 -97.3110 4469.00 4464.00 5.00 464544 MEX 2019 08 02 13 30 00 2290-99 P co2 CCGG 409.470 0.041 ... PC2 2019 09 18 10 41 08 18.9841 -97.3110 4469.00 4464.00 5.00 464545 MEX 2019 08 09 14 00 00 511-99 P co2 CCGG 409.550 0.041 ... PC2 2019 09 11 13 18 05 18.9841 -97.3110 4469.00 4464.00 5.00 464351 MEX 2019 08 09 14 00 00 512-99 P co2 CCGG 409.610 0.041 ... PC2 2019 09 11 13 32 22 18.9841 -97.3110 4469.00 4464.00 5.00 464352 MEX 2019 08 22 14 00 00 2197-99 P co2 CCGG 408.470 0.041 ... PC2 2019 09 11 12 49 34 18.9841 -97.3110 4469.00 4464.00 5.00 464353 MEX 2019 08 22 14 00 00 2198-99 P co2 CCGG 408.250 0.041 ... PC2 2019 09 11 13 03 50 18.9841 -97.3110 4469.00 4464.00 5.00 464354 MEX 2019 09 04 13 30 00 3837-99 P co2 CCGG 408.070 0.041 ... PC2 2019 10 22 16 41 01 18.9841 -97.3110 4469.00 4464.00 5.00 466235 MEX 2019 09 04 13 30 00 3838-99 P co2 CCGG 408.090 0.041 ... PC2 2019 10 22 16 55 22 18.9841 -97.3110 4469.00 4464.00 5.00 466236 MEX 2019 09 13 13 30 00 4701-99 P co2 CCGG 408.950 0.041 ... PC2 2019 10 22 16 12 16 18.9841 -97.3110 4469.00 4464.00 5.00 466237 MEX 2019 09 13 13 30 00 4702-99 P co2 CCGG 408.820 0.041 ... PC2 2019 10 22 16 26 37 18.9841 -97.3110 4469.00 4464.00 5.00 466238 MEX 2019 09 26 14 00 00 4803-99 P co2 CCGG 407.060 0.041 ... PC2 2019 10 22 15 43 33 18.9841 -97.3110 4469.00 4464.00 5.00 466373 MEX 2019 09 26 14 00 00 5497-99 P co2 CCGG 407.070 0.041 ... PC2 2019 10 22 15 57 54 18.9841 -97.3110 4469.00 4464.00 5.00 466374 MEX 2019 09 30 13 30 00 4966-99 P co2 CCGG 410.090 0.041 ... PC2 2019 10 22 15 14 50 18.9841 -97.3110 4469.00 4464.00 5.00 466371 MEX 2019 09 30 13 30 00 5309-99 P co2 CCGG 410.200 0.041 ... PC2 2019 10 22 15 29 12 18.9841 -97.3110 4469.00 4464.00 5.00 466372 MEX 2019 10 04 13 30 00 1973-99 P co2 CCGG 408.960 0.041 ... PC2 2020 01 07 10 55 55 18.9841 -97.3110 4469.00 4464.00 5.00 468596 MEX 2019 10 04 13 30 00 901-99 P co2 CCGG 408.920 0.041 ... PC2 2020 01 07 10 41 34 18.9841 -97.3110 4469.00 4464.00 5.00 468595 MEX 2019 10 11 14 00 00 4598-99 P co2 CCGG 407.480 0.041 ... PC2 2020 01 06 16 28 25 18.9841 -97.3110 4469.00 4464.00 5.00 468593 MEX 2019 10 11 14 00 00 5424-99 P co2 CCGG 407.440 0.041 ... PC2 2020 01 06 16 42 44 18.9841 -97.3110 4469.00 4464.00 5.00 468594 MEX 2019 10 22 14 00 00 2430-99 P co2 CCGG 409.080 0.041 ... PC2 2020 01 07 15 27 50 18.9841 -97.3110 4469.00 4464.00 5.00 468589 MEX 2019 10 22 14 00 00 4777-99 P co2 CCGG 409.070 0.041 ... PC2 2020 01 07 15 42 08 18.9841 -97.3110 4469.00 4464.00 5.00 468590 MEX 2019 10 31 14 00 00 4868-99 P co2 CCGG 409.330 0.041 ... PC2 2020 01 07 14 59 12 18.9841 -97.3110 4469.00 4464.00 5.00 468591 MEX 2019 10 31 14 00 00 5037-99 P co2 CCGG 409.330 0.041 ... PC2 2020 01 07 15 13 33 18.9841 -97.3110 4469.00 4464.00 5.00 468592 MEX 2019 11 08 14 00 00 157-99 P co2 CCGG 409.340 0.041 ... PC2 2020 02 14 11 13 25 18.9841 -97.3110 4469.00 4464.00 5.00 470062 MEX 2019 11 08 14 00 00 243-99 P co2 CCGG 408.990 0.041 N.. PC2 2020 02 14 11 27 47 18.9841 -97.3110 4469.00 4464.00 5.00 470063 MEX 2019 11 15 15 00 00 1386-99 P co2 CCGG 412.740 0.041 ... PC2 2020 02 14 10 44 43 18.9841 -97.3110 4469.00 4464.00 5.00 470064 MEX 2019 11 15 15 00 00 4636-99 P co2 CCGG 412.570 0.041 ... PC2 2020 02 14 10 59 02 18.9841 -97.3110 4469.00 4464.00 5.00 470065 MEX 2019 12 05 13 30 00 4704-99 P co2 CCGG 409.920 0.041 ... PC2 2020 02 13 14 22 07 18.9841 -97.3110 4469.00 4464.00 5.00 470254 MEX 2019 12 05 13 30 00 573-99 P co2 CCGG 409.810 0.041 ... PC2 2020 02 13 14 07 47 18.9841 -97.3110 4469.00 4464.00 5.00 470255 MEX 2019 12 09 14 30 00 2678-99 P co2 CCGG 408.810 0.041 ... PC2 2020 02 13 13 39 07 18.9841 -97.3110 4469.00 4464.00 5.00 470252 MEX 2019 12 09 14 30 00 4151-99 P co2 CCGG 408.770 0.041 ... PC2 2020 02 13 13 53 27 18.9841 -97.3110 4469.00 4464.00 5.00 470253 MEX 2019 12 13 14 30 00 1812-99 P co2 CCGG 410.510 0.041 ... PC2 2020 03 04 13 48 09 18.9841 -97.3110 4469.00 4464.00 5.00 471470 MEX 2019 12 13 14 30 00 2320-99 P co2 CCGG 410.500 0.041 ... PC2 2020 03 04 14 02 27 18.9841 -97.3110 4469.00 4464.00 5.00 471471 MEX 2019 12 20 14 00 00 1995-99 P co2 CCGG 412.240 0.041 N.. PC2 2020 03 04 14 16 46 18.9841 -97.3110 4469.00 4464.00 5.00 471472 MEX 2019 12 20 14 00 00 5355-99 P co2 CCGG 412.750 0.041 N.. PC2 2020 03 04 14 31 07 18.9841 -97.3110 4469.00 4464.00 5.00 471473 MEX 2020 01 14 14 30 00 4239-99 P co2 CCGG 412.100 0.041 ... PC2 2020 03 02 12 52 54 18.9841 -97.3110 4469.00 4464.00 5.00 471234 MEX 2020 01 14 14 30 00 4767-99 P co2 CCGG 412.200 0.041 ... PC2 2020 03 02 13 07 21 18.9841 -97.3110 4469.00 4464.00 5.00 471235 MEX 2020 01 23 14 30 00 2385-99 P co2 CCGG 414.000 0.041 ... PC2 2020 03 02 12 24 12 18.9841 -97.3110 4469.00 4464.00 5.00 471232 MEX 2020 01 23 14 30 00 2414-99 P co2 CCGG 414.110 0.041 ... PC2 2020 03 02 12 38 33 18.9841 -97.3110 4469.00 4464.00 5.00 471233 MEX 2020 02 04 14 00 00 102-99 P co2 CCGG 413.530 0.041 ... PC2 2020 03 19 12 55 10 18.9841 -97.3110 4469.00 4464.00 5.00 471791 MEX 2020 02 04 14 00 00 1692-99 P co2 CCGG 413.520 0.041 ... PC2 2020 03 19 13 09 32 18.9841 -97.3110 4469.00 4464.00 5.00 471792 MEX 2020 02 07 14 00 00 2337-99 P co2 CCGG 414.040 0.041 ... PC2 2020 03 19 11 57 33 18.9841 -97.3110 4469.00 4464.00 5.00 471789 MEX 2020 02 07 14 00 00 5247-99 P co2 CCGG 414.130 0.041 ... PC2 2020 03 19 12 11 56 18.9841 -97.3110 4469.00 4464.00 5.00 471790 MEX 2020 02 13 14 30 00 2007-99 P co2 CCGG 420.210 0.041 .Z. PC2 2020 03 18 14 13 03 18.9841 -97.3110 4469.00 4464.00 5.00 471757 MEX 2020 02 13 14 30 00 2051-99 P co2 CCGG 420.190 0.041 .Z. PC2 2020 03 18 14 27 22 18.9841 -97.3110 4469.00 4464.00 5.00 471758 MEX 2020 02 19 14 00 00 2055-99 P co2 CCGG 413.140 0.041 ... PC2 2020 03 18 14 41 40 18.9841 -97.3110 4469.00 4464.00 5.00 471759 MEX 2020 02 19 14 00 00 4197-99 P co2 CCGG 413.000 0.041 ... PC2 2020 03 18 14 55 59 18.9841 -97.3110 4469.00 4464.00 5.00 471760 MEX 2020 02 28 15 00 00 3969-99 P co2 CCGG 412.910 0.041 ... PC2 2020 07 20 16 01 52 18.9841 -97.3110 4469.00 4464.00 5.00 477148 MEX 2020 02 28 15 00 00 4831-99 P co2 CCGG 413.000 0.041 ... PC2 2020 07 20 16 16 16 18.9841 -97.3110 4469.00 4464.00 5.00 477149 MEX 2020 03 04 14 30 00 3310-99 P co2 CCGG 413.240 0.041 ... PC2 2020 07 20 15 33 04 18.9841 -97.3110 4469.00 4464.00 5.00 477142 MEX 2020 03 04 14 30 00 4611-99 P co2 CCGG 413.670 0.041 ... PC2 2020 07 20 15 47 28 18.9841 -97.3110 4469.00 4464.00 5.00 477143 MEX 2020 03 11 15 00 00 2110-99 P co2 CCGG 414.810 0.041 ... PC2 2020 07 22 08 19 39 18.9841 -97.3110 4469.00 4464.00 5.00 477128 MEX 2020 03 11 15 00 00 2982-99 P co2 CCGG 414.840 0.041 ... PC2 2020 07 22 08 34 06 18.9841 -97.3110 4469.00 4464.00 5.00 477129 MEX 2020 03 19 14 00 00 2644-99 P co2 CCGG 412.350 0.041 N.. PC2 2020 07 22 08 48 29 18.9841 -97.3110 4469.00 4464.00 5.00 477130 MEX 2020 03 19 14 00 00 2903-99 P co2 CCGG 402.500 0.041 N.. PC2 2020 07 22 09 02 56 18.9841 -97.3110 4469.00 4464.00 5.00 477131 MEX 2020 04 24 14 00 00 1163-99 P co2 CCGG 416.870 0.041 ... PC2 2020 08 07 16 39 09 18.9841 -97.3110 4469.00 4464.00 5.00 478150 MEX 2020 06 25 13 00 00 5554-99 P co2 CCGG 414.270 0.041 ... PC2 2020 08 07 14 00 55 18.9841 -97.3110 4469.00 4464.00 5.00 478151 MEX 2020 06 25 13 00 00 727-99 P co2 CCGG 414.240 0.041 ... PC2 2020 08 07 13 46 32 18.9841 -97.3110 4469.00 4464.00 5.00 478152 MEX 2020 07 02 13 00 00 4507-99 P co2 CCGG 415.780 0.041 ... PC2 2020 08 07 14 29 44 18.9841 -97.3110 4469.00 4464.00 5.00 478155 MEX 2020 07 02 13 00 00 827-99 P co2 CCGG 415.810 0.041 ... PC2 2020 08 07 14 15 19 18.9841 -97.3110 4469.00 4464.00 5.00 478156 MEX 2020 07 12 14 00 00 1805-99 P co2 CCGG 414.500 0.041 ... PC2 2020 08 07 14 44 11 18.9841 -97.3110 4469.00 4464.00 5.00 478153 MEX 2020 07 12 14 00 00 3617-99 P co2 CCGG 414.490 0.041 ... PC2 2020 08 07 14 58 35 18.9841 -97.3110 4469.00 4464.00 5.00 478154 MEX 2020 07 19 14 00 00 3709-99 P co2 CCGG 410.110 0.041 N.. PC2 2020 10 23 13 50 07 18.9841 -97.3110 4469.00 4464.00 5.00 481133 MEX 2020 07 19 14 00 00 991-99 P co2 CCGG 411.720 0.041 N.. PC2 2020 10 23 13 35 51 18.9841 -97.3110 4469.00 4464.00 5.00 481132 MEX 2020 07 26 13 30 00 4551-99 P co2 CCGG 411.160 0.041 ... PC2 2020 10 23 14 04 23 18.9841 -97.3110 4469.00 4464.00 5.00 481134 MEX 2020 07 26 13 30 00 4883-99 P co2 CCGG 411.170 0.041 ... PC2 2020 10 23 14 18 40 18.9841 -97.3110 4469.00 4464.00 5.00 481135 MEX 2020 08 03 14 00 00 5384-99 P co2 CCGG 410.830 0.041 ... PC2 2020 10 23 11 41 23 18.9841 -97.3110 4469.00 4464.00 5.00 481111 MEX 2020 08 03 14 00 00 5471-99 P co2 CCGG 410.860 0.041 ... PC2 2020 10 23 11 55 40 18.9841 -97.3110 4469.00 4464.00 5.00 481112 MEX 2020 08 17 13 30 00 3853-99 P co2 CCGG 412.070 0.041 ... PC2 2020 10 23 14 47 12 18.9841 -97.3110 4469.00 4464.00 5.00 481137 MEX 2020 08 17 13 30 00 734-99 P co2 CCGG 411.950 0.041 ... PC2 2020 10 23 14 32 56 18.9841 -97.3110 4469.00 4464.00 5.00 481136 MEX 2020 09 10 14 00 00 2640-99 P co2 CCGG 410.530 0.041 ... PC2 2021 02 02 17 02 52 18.9841 -97.3110 4469.00 4464.00 5.00 484794 MEX 2020 09 10 14 00 00 3475-99 P co2 CCGG 410.570 0.041 ... PC2 2021 02 02 17 17 08 18.9841 -97.3110 4469.00 4464.00 5.00 484795 MEX 2020 10 13 13 00 00 4157-99 P co2 CCGG 410.300 0.041 ... PC2 2021 02 02 16 34 20 18.9841 -97.3110 4469.00 4464.00 5.00 484792 MEX 2020 10 13 13 00 00 4313-99 P co2 CCGG 410.260 0.041 ... PC2 2021 02 02 16 48 37 18.9841 -97.3110 4469.00 4464.00 5.00 484793 MEX 2020 10 21 13 00 00 3317-99 P co2 CCGG 411.170 0.041 ... PC2 2021 02 03 11 41 31 18.9841 -97.3110 4469.00 4464.00 5.00 484798 MEX 2020 10 21 13 00 00 5624-99 P co2 CCGG 411.240 0.041 ... PC2 2021 02 03 11 55 47 18.9841 -97.3110 4469.00 4464.00 5.00 484799 MEX 2020 11 24 15 00 00 1693-99 P co2 CCGG 411.330 0.041 ... PC2 2021 02 03 11 12 56 18.9841 -97.3110 4469.00 4464.00 5.00 484796 MEX 2020 11 24 15 00 00 2769-99 P co2 CCGG 411.480 0.041 ... PC2 2021 02 03 11 27 12 18.9841 -97.3110 4469.00 4464.00 5.00 484797 MEX 2020 12 06 14 30 00 2949-99 P co2 CCGG 413.240 0.041 ... PC2 2021 03 03 11 42 59 18.9841 -97.3110 4469.00 4464.00 5.00 486115 MEX 2020 12 06 14 30 00 4073-99 P co2 CCGG 413.390 0.041 ... PC2 2021 03 03 11 57 14 18.9841 -97.3110 4469.00 4464.00 5.00 486116